Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutCO 189~ ,.;onservation Order Cover Page XHVZE This page is required for administrative purposes in managing the scanning process. It marks the extent of scanning and identifies certain actions that have been taken. Please insure that it retains it's current location in this file. /__ ~ ~_ Conservation Order Category Identifier Organizing RESCAN [] Color items: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED (Scannable with large plotter/scanner) [] Maps: [] Other items OVERSIZED (Not suitable for plotter/scanner, may work with 'log' scanner) [] Logs of various kinds [] Other · BY: .... ~ARIA Scanning Preparation TOTAL PAGES L/'' ~ Production Scanning Stage I PAGE COUNT FROM SCANNED DOCUMENT: PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: /~ YES NO Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: __ YES __ NO (SCANNING IS COMPL~'E-A~I$ POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES) General Notes or Comments about this Document: 5/21/03 ConservOrdCvrPg.wpd • Index Conservation Order 189 Prudhoe Bay Field 1. April 19, 1983 Arco's request for waiver to run a static bottlehole pressure survey 2. April 27, 1983 Notice of Public Hearing, Affidavit of Publication Conservation Order 189 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501 Re: THE APPLICATION OF ARCO, ) ALASKA, INC. for an order ) granting an exception to ) Rule 6(c) Conservation Order) No 165 for the Prudhoe Bay ) Unit well DS 4-5. ) Conservation Order No. 189 Prudhoe Bay Field Prudhoe Oil Pool May 9, 1983 IT APPEARING THAT: I · ARCO'Alaska, Inc. by letter dated April 19, 1983, requested the Alaska Oil and Gas Conservation Commis- sion to issue an order granting an exception to Rule 6(c) of Conservation Order No. 165 for the Prudhoe Bay Unit well number DS 4-5. The exception would permit the running of a static bottomhole pressure survey in lieu of a transient pressure survey on the well. · Notice of public hearing was published in the Anchorage Times on April 27, 1983. · FINDINGS: There were no protests to the application. · The Prudhoe Bay Unit well No. DS 4-5 is a key well in the pressure mQnitoring program for the field and, as such, requires la Semi-annual transient pressure survey. · · The Prudhoe Bay Unit well No. DS 4-5 has been shut-in since April, 1982 due to fl°wline corrosion. There have been many ~.pres sure surveys run on this key well and it is an-~id~'eal well to give an accurate average reservoir pressure for the area. CONCLUSIDN: I · The referenced well has been shut-in a sufficient length of time so that a static bottomhole pressure survey will provide the required pressure information to monitor reservoir performance. Conservation Order No. 189 Page 2 May 9, 1983 NOW THEREFORE, IT IS ORDERED THAT: · Prudhoe Bay Unit well No. DS 4-5, a key well, may be surveyed by a bottomhole static pressure method for the survey required in the first half of 1983. DONE at Anchorage, Alaska and dated May 9, 1983. C~. V. ~hati~ Alaska Oil and Gas Conservation Commission Harry W. ~dgler, Co issioner Alaska Oil and Gas Eonservation Commission L~fnnie C. Smit~,~-Commissioner Alaska Oil and Gas Conservation Commission PRDO~ OF PUSLICA'£ION THE ANCHORAGE TIM: P.O. BOX ANCHORAGE, AbA6KA 40 99510-0040 AK OIL & GAS CONSERVATION COreM 3001 PO~CUPIN£ DR. AmCHORAG£, AK 99501 DEbbA E. bLACK , BEING DUBY ~$WORN, ACCORDING TO L.A~ DECLARES: THAT SHE IS THE LEGAL CLER~ OF THE ANCHORAGE TI~ES, A DAILY NEWSPAPE~ PUBbISHEO IN TH~ TOWN OF ANCHORAGE IN THE THIRD JUDICIAL OIVISION, STAT~ OF A~A~A, AND THAT "fHE NOTICfi~ OF......................,... AO-O8 5524 STATE 0~: ALASKA NOTICE OF PUaL~C HEARING, STAT E OF ;~LASKA' ' Alaska, Oil and C.,~S. ,':' Consej'vaflo~ CommisSion' A COPY OF WHI¢, I$ HERETO ATTACHED, WAS PUBLISHED IN................... OF THE] ANCHORAGE B~GINNING ON.,..,..,..,.,........,. ENDING ON.........,............,... THE SIZE OF This AD ~AS...,,.,,.... SIGNED, , . , . , , , , , THE PRICE OF THIS AD IS............. THE AD NUMBER IS.................... 1 0,4/27/83 62 $ 18.60 1524290 ' the ,:ir of , age~ fesf~l fbe above hm will arKy,'W,,'~KUgler,,, ,,, om'~iSglOneF'" ' ' L ALASKA.OI L &' GAS i CONSERVATio~i.' . ' COMMISSION: ,: : Pub: 'APr, ~7,1~ SUBSCRIBED AMI) SWORN TO BEFOR~ ME THIS.......,.,.......,. 27 OAY OF AP.R,1983 NOTARY PUBLIC OF TB, E STATE OF Ab,ASKA NOTICE OF PUBLIC HEARING STATE OF ALASKA Alaska Oil and Gas Conservation Commission Re: The application of ARCO ALASKA, INC., dated April 19, 1983, requesting an exception to Rule 6(c) of Conservation Order No. 165 in order to run a static bottomhole pressure survey in lieu of a bottomhole transient pressure survey on Prudhoe Bay Unit well No. DS 4-5. Notice is hereby given that ARCO ALASKA, INC. has requested the Alaska Oil and Gas Conservation Commission, to issue an order granting an exception to Rule 6(c) of Conservation Order No. 165 for the Prudhoe Bay Unit well DS 4-5, designated as a key well. The exception is requested because the well is shut-in due to flowline corrosion. Parties who may be aggrieved if the order is issued granting the reference exception are allowed 10 days from the date of this publication in which to file a protest, in writing, stating in detail the nature of their aggrievement and their request for a hearing. The place of filing is the Alaska Oil and Gas Conserva- tion Commission, 3001 Porcupine Drive, Anchorage, Alaska 99501. If such a protest is timely filed, a hearing on the matter will be held at the above address at 9:00 AM on May 9, 1983 at which time protestants and others may be heard. If no such protest is timely filed, the Commission will consider the issuance of the order without a hearing. Kugler C ommi s s ioner Alaska Oil and Gas Conservation Commission ARCO Alaska, Inc.~{' Prudhoe Bay P_.ngineering Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 263 4248 Donald F. Scheve Regional Operations Engineer April 19, 1983 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Re: D.S. 4-5 Permit No. 71-25 Prudhoe Bay Pressure Survey Enclosed is a Sundry Notice requesting a waiver to run a static bottomhole pressure survey on DS 4-5 in lieu of the first half semi-annual transient pressure survey prescribed in Conservation Order 165, Rule 6-C. The well is shut-in due to flowline corrosion. If you have any questions, please call John Whitehead at 263-4208. Very truly yours, D. F. Scheve DFS/AJW/lmi Attachments cc: D. E. Andrews J. W, Groth/E. W. Skaalure J. R. Schuyler SOHIO Alaska Petroleum ARCO Alaska, Inc. Is a Subsidiary of AflantlcRIchfleldCompany ( STATE OF ALASKA '(~ ALASKA OIL AND GAS CONSERVATION C ,vlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL~ OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 71-25 3. Address 8. APINumber P.O. Box 100360, Anchorage, Alaska 99510 50- 029-20107 4. Location of Well 742'S and 420'W of NE Cr, Sec. 34, Tll0N, R15E, UM (surf.) 1652'N and 1740'E of SW Cr, Sec. 27, T10N, R15E, UM (bottomhole) 5. Elevationinfeet(indicateKB, DF, etc.) 64' RKB I 6. Lease Designation and Serial No. ADL 28325 12. 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number DS 4-5 11. Field and Pool Prudhoe Bay Field Prudhoe Bay Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Conservation Order 165, rule 6-c requires a semi-annual transient pressure survey be conducted on each key well. ARCO Alaska, Inc. requests a waiver to run a static bottomhole pressure survey on key well 4-5 in lieu of the transient pressure survey required for the first half of 1983. Permission was granted to run static surveys in lieu of both 1982 semi-annual transient pressure surveys. The well remains inoperable due to flowline corrosion. Well 4-5 is the preferred well for this semi-annual survey because it has been the key well since start-up and numerous pressure surveys have been run. The well has been shut-in since April 1982; therefore, the recorded pressure should be an accurate average reservoir pressure for the area. 14. I hereby,certify that the foregoing is_true and correct to the best of my knowledge. Signed . . Title Regional Engineer The space below for Commission use Date Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate