Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutCO 199Conservation Order Cover Page XHVZE This page is required for administrative purposes in managing the scanning process. It marks the extent of scanning and identifies certain actions that have been taken. Please insure that it retains it's current location in this file. L ~-q- Conservation Order Category Identifier Organizing RESCAN DIGITAL DATA OVERSIZED (Scannable with large plotter/scanner) [] Color items: [] Diskettes, No. [] Maps: [] Grayscale items: [] Other, No/Type [] Other items [] Poor Quality Originals: OVERSIZED (Not suitable for [] Other: plotter/scanner, may work with 'log' scanner) [] Logs of various kinds [] Other NOTES: BY: Scanning Preparation BY: ROBIN ~ Production Scanning Stage I PAGE COUNT FROM SCANNED DOCUMENT: ~'"'~ PAGE COUNT MATCHES NUMBER IN SCANNING pREPARATION: ,/~ YES __ NO Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES ~ NO BY: (~~ MARIA DATE: ~'- //-~ ~,~ (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES) General Notes or Comments about this Document: 5/21/03 ConservOrdCvrPg.wpd STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Re: THE APPLICATION OF ARCO ) ALASKA, INC. for an order ) granting an exception to ) Conservation Order No. 145 ) for the Prudhoe Bay Unit ) No. DS 15-17 well. ) Conservation Order No. 199 Prudhoe Bay Field Prudhoe Oil Pool July 13, 1984 IT APPEARING THAT: I · ARCO Alaska, Inc. submitted an application, dated June 28, 1984, requesting an exception of Rule 3 of Conservation Order No. 145 for the Prudhoe Bay Unit No. DS 15-17 well. The referenced Rule 3 requires production casing or liner to be landed through the completion zone and cement to cover and extend to at lease 500 feet above the hydrocarbon-bearing formations which are potentially productive. · ARCO Alaska, Inc. proposes to run a slotted liner through the lower most section of the Sadlerochit Formation with no cement behind the slotted liner. The regular seven inch liner above the slotted section will be cemented to at least 500 feet above the hydrocarbon-bearing zone. · Notice of the application was published in the Anchorage Times on July 2, 1984. 4. There were no protests to the application. FINDINGS: 1. · Completions using a slotted liner are common in many oil-producing areas. There already have been open hole completions and gravel-packed completions in the Sadlerochit Formation in the Prudhoe Bay Field. CONCLUSION: The requested exception will not create waste and will add to the knowledge of completion techniques for the Prudhoe Oil Pool. Conservation Order. No. 199 Page 2 July 13, 1984 NOW THEREFORE, IT IS ORDERED THAT: ARCO Alaska, Inc. is exempted from the requirements of Rule 3 of Conservation Order No. 145 and may complete the Prudhoe Bay Unit No. DS 15-17 well with an uncemented slotted liner in the lower-most section of the Sadlerochit Formation. DONE at Anchorage, Alaska and dated July 13, 1984. ~~rman Alaska Oil and Gas Conservation Commission Harry W./Kugler, CoTfimissioner Alaska Oil and GasZConservation Commission L~z~ie C. Smit~,k~;~"~ssioner Alaska Oil and Gas Conservation Commission L PROOF OF PUSblCATIOr~ P. 0 · F 0 X /~i'~ Ct~ORAG E , AL~SI~.A 4O 9951 o-0040 ALASKA 01, L A~'~O GAS CONSERVATIO 3001 PORUCPINE: DRIVE ANCHORAGE, AK 99501 LA(~MA SIliCONS , BEING DULY SWORN, ACCORDING TO LAW DECLARES: THAT SHE IS THE LEGAL CLERK OF THE ANCHORAGE TIi~ES, A DALLY NEWSPAPER PUBLISHED IN THE TO~N OF ANCHORAGE IN THE THIRD dUDiCIAL DIVISION, STATE OF ALASgA, AND T~T THE NUTICE OF. ............... ...,....,. A COPY OF' WHICH IS HERETO ATTACHf:D, WAS PUBLISHED 1N ...... ..,..... ..... OF THE ANCHORA. GE TI~ES. BEGINNING ON ....................... ENDING ON. ...... ............. .... .. SIZE OF T~iS AD ~AS............ AO-08 5534 ISSUES 07/02184 07~02~84 68 '[,,, I N ~: S STATE OF ALASKA NOTICE OF PUBLIC HEARING STATE'OF ALASKA Alaska Oil,and Gas . .. Conservation Commi~sion 'Re: The oppllcofion of ARCC: ALASKA, INC. 'fOr an exCep- tion to Rule 3(f) of Conserva- tion order No. }45 to use o slot~ ted liner in,the Prudhoe Boy Unit No. DS-lS-17.Well:, .," ~ Notice Is hereby given that | ARCO Alaska, J quested the AlaskO~'OlF end 1 'Conservation. 'Commi~slon" '1o ~ "issue' on'.(~rd~r to grant-the:use I, of. o slotted' I. in~r.,.In the coml~le- I'"' fibn' '~of' .the 'Pr'i~d~e 'BOy unit I~."Nd; DS 15-1.7 W~H';~:RO]e 3(f)':'0f I.. Conservation Order No. 145 re- 'I.. q~tires oll hYd~oc0rb, on,beo,ring. J"'i z~.es,, be' c'0V'er~l,"..bY, dement I".,~Whlch 'Is not' ~roCflc01' When..:a I' 'slOtted liner is used.' .In S.Ul~Port J:. Of thl~ .requf~$:t~.~:RCO'.A~ka: I': I. c ?sro t eS:th J:l'~Z f~.~,?'~, of%!0.t. ,t, ea, ~1' I I nei{ .wlil?.:i~i'6~de(,odd!fl~rtd r'] n- J for.mqtl0nr! On ,: '. c6mpletion '1 tecnnlques'.in,?f~e 1.$adlero~hlt [?: I=0rm~,tti~n; and,'; ~nould. :r .esUit,.~ln I. InC~eas~d.proa~ctiOn m 10w' p~- J. tenflalWells'. ':... pa'rfl..e~'i who ..may. be '. ag, ...~gr~lV~d"~...l~ the order 'is'IssUed :,:,gr~ntlng:,,the referenced,rbquest I,'!are ul,lOWed 10' days 'from' the I tm t.e-a Protest, m wrm,~, stat- I lng in 'detail the nature of their aggrlev~ement and their request .for a hebrlng. The place of filing Is. :the. Alaska Oil 'and Gas con- ser,vation . Commission, 3001 Porcupine Drive, Anchorage, Alaska 99501-3192. If. such a.pro- f'est Is timely filed, a hearing dn the matter will be held at the above address of 9:00 AM on July 13, 19B~ at which time pro- testants end others may De heard. If no such protest is timely fileU, the Commission will consider the issuance of the order without a hearing. , , :. 'Ha.r~Y',wl' 'Kugler; ' ' , :.. ,Comm'isSioner '~', .'i: A.l(:l'~k:~J'!~,O Ii. & 'Gas.'. :' ' ... ! cOn'~erv, ation Commlssi'on <,,/~0~08,5534 ,,,'%b: j~,,,, % 1"4," , THE PRICE OF THiS AD IS............. AD N'UMBER IS ........ ............ SUBSCRIBflD AND SWOR. b~ TO BEFORE i~'E THIS .......... ......... [~OTARY P'O'E~L I C OF" THE STATE OF" ALASKA Notice of Public Hearing STATE OF ALASKA Alaska Oil and Gas Conservation Commission Re: The application of ARCO ALASKA, INC. for an exception to Rule 3(f) of Conservation Order No. 145 to use a slotted liner in the Prudhoe Bay Unit No. DS 15-17 well. Notice is hereby given that ARCO Alaska, Inc. has requested the Alaska Oil and Gas Conservation Commission to issue an order to grant the use of a slotted liner in the completion of the Prudhoe Bay Unit No. DS 15-17 well. Rule 3(f) of Conservation Order No. 145 requires all hydrocarbon-bearing zones be covered by cement which is not practical when a slotted liner is used. In support of this request, ARCO Alaska, Inc. states that the use of a slotted liner will provide additional information on completion techniques in the Sadlerochit Formation and should result in increased production in low potential wells. Parties who may be aggrieved if the order is issued granting the referenced request are allowed 10 days from the date of this publication in which to file a protest, in writing, stating in detail the nature of their aggrievement and their request for a hearing. The place of filing is the Alaska Oil and Gas Conservation Commission, 3001 Porcupine Drive, Anchorage, Alaska 99501-3192. If such a protest is timely filed, a hearing on the matter will be held at the above address at 9:00 AM on July 13, 1984 at which time protestants and others may be heard. If no such protest is timely filed, the Commission will consider the issuance of the order without a hearing. Harry W. Kugler~~ Commissioner Alaska Oil & Gas Conservation Commission ARCO Alaska, ii Post Offk;e Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 June 28, 1984 Mr. C. V. Chatterton Commi s s i one r State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: DS 15-17 Well Dear Mr. Chatterton: ARCO Alaska, Inc., requests an exception to Rule 3(f) of Conservation Order No. 145 and Prudhoe Bay Field Rules to be able to complete the subject well using a slotted liner. The use of a slotted liner is proposed to provide additional information on completion techniques in the Sadlerochit formation. Such a completion technique should allow increased production in low potential wells. We have filed the application for Permit to Drill DS 15-17, the required $100 filing fee, and a Sundry Notice changing the completion to a slotted liner. Attachments to the application included a plat detailing the section and plan views of the proposed well course, a sketch and description of the BOP equipment, and a sketch of the surface hole diverter. We anticipate being ready to run this completion on July 18, 1984. Your earliest approval would be appreciated. Sincerely, T. L. Fithian Area Drilling Engineer TLF/JFM/tw JFM/28 RECEIVED Alaska Oil & Gas Cons. Commlsslorl Anchorage ARCO Alaska, Inc. is a Subsidiary o! AtlanticRichfieldCompany GRAVEL PAD ~. 4fi TUNDRA 20- CONDUCTOR CASING PRIMARY CEMENT ARCTIC PACK :t 2330ft. SAFETY VALVE t PERMAFROST 1/2' HOLE 13 3/8" SURFACE CASING 9 5/8" PRODUCTION CASING -- 12 I/4" HOLE 5 1/2" TUSING GAS LIFT MANDRELS PRUDHOE BAY COMPLETION ATTACHMENT %1 Drill Site 15 Objectives ARCO Proposed Revised Development Plan (June 18, 1984) Study results indicate that drilling and completion techniques will signifi- cantly impact upstructure Zone 1 recovery. The prime objective of the revised development plan is to improve Zone 1 productivity enough to achieve an adequate, sustainable oil rate from a small interval as low in the formation as possible. This will provide maximum GOC standoff and increase the probability of completing.under a competent shale. ARCO proposes to evaluate several different drilling/completion techniques at Drill Site 15. The performance of these wells will be closely monitored for the next six to eight months. Based on these results, "conventional" Prudhoe Bay practices can be modified to optimize completions on upcoming wells at Drill Site 18 and in other upstructure areas. Further, we see this 6-8 Well program as a logical progression leading to the possible drilling of a horizontal hole in the near future. The six well program will provide critical completion experience and compar- ative results for use in the future. Specific areas to be evaluated are: 1, Productivity improvements in conventionally drilled and completed wells perforated with large casing guns, shot underbalanced or overbalanced through a salt pill. . Productivity improvements when drilling with a clean, saturated, sized-salt brine, then not allowing cement filtrate to contact the formation. Slotted liner will be run with combination solid liner multi-formation packers cemented above the open-hole area. 3, Productivity improvements due to Item (2) above, used in a high angle well (i.e. 80° through Zone 1). 4. High angle hole drilling, logging, and completion performance: A, B, m~ Drilling tools, downhole assembly performance and angle control at 80°+ degrees deviation. Cementing competency. Sand/shale correlations, timely base of sand detection, and log interpretation techniques. MWD and GR capabilities. VLN-28.2 6-18-84 Attachment #3 Drill Site 15 HIGH ANGLE UPSTRUCTURE WELL GENERAL IZED PROCEDURE {Cost Estimate $3.8MM} 1. Set 20" conductor to 80'. 2. NU diverter system. 3. Drill 17-1/2" hole to 13-3/8" casing point. 4. Run, set and cement 13-3/8", 72#, L-80, BTC casing. 5. ND diverter. NU BOPE. 6. Directionally drill {2.5°/100'} 12-1/4" hole ~ 500-+ to top of Sadlerochit (8400'-+TVD) using dispersed Lignosulfonate mud below the K-lO shale. Drop multishot survey. 7. Run, set and cement 9-5/8", 47#, L-80, BTC casing. 8. Drill out 9-5/8" shoe & perform leakoff test. Displace well to 10.2 ppg Bridgesal system. 9. Directionally drill {3.5°/100') 8-1/2" hole f/50°- 80° to Zone 2/Zone 1 interface. MWD wi th GR will be used. 10. Drill 8-1/2" hole ~ 80° to 150'MD below the base of the Sadlerochit. Drop multishot survey. 11. Run drill pipe conveyed open hole logs. Make conditioning trip. 12. Run 7", 29#, L-80, BTC liner with slotted {.030"+) pipe across Zone 1. 13. Cement 7" above Zone I using an external casing packer (ECP) set @ Zone 2/Zone 1 interface and a liner hanger packer. 14. Clean out well to landing collar. 15. Run CBL. Squeeze as necessary. 16. Clean out well to TD. 17. RIH with test packer and tbg. Set packer ~ 500-+. Displace tbg to diesel and nitrogen through by-pass. 18. Clean up and flow test well. 19. Kill well with a Bridgesal pill. POOH with test string. LDDP. 20. Run completion assembly (per Operations Engineering and flow test results). 21. ND BOPE. NU tree. 22. I4IRU SL unit. Pull GLM dummy above packer. Displace tubing to crude and annulus to 9.6 ppg NaC1 with a diesel cap. Replace GLM dummy. 23. Secure well. Release rig. COULD BE DONE WITH COMPLETION RIG .Q ® ® ATTACHMENT #2 ARCO Proposed Drill Site ]5 Drilling Program Drill Order Well No. 16 17 2O (Mud) Bridge Sal Perf. Pill Drill Slotted Liner Yes DST No High Angle Wireline Tbg. Chem Csg. Conveyed Inj. Guns Csg. Gun String Yes - Yes Yes Comments Conventional angle. Drill Drill Perf. Pill Yes Yes Yes Yes 80° 80° Yes or Yes Yes Contingent on No. 16 logs. Tbg. Cony. guns if reqd. To open more hole after DST. Tbg. Conv. guns if reqd. To open more hole after DST. 18 19 Yes Dependent on prior GOC and shale picture. Dependent on prior GOC and shale picture. Corrosion inhibition test program for non-gas lifted completions. Possible use for mitigation of scale or wax problems. VLN- 28.3 6-18-84