Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
201-020
• • RECEIVED Post Office Box 244027 Anchorage,AK 99524-4027 i Hilcorp Alaska,LLC L 3 0 20h 3800 Centerpoint Drive Suite 100 Anchorage,AK 99503 Phone: 907/777-8300 Fax: 907/777.-8301 July 29, 2015 Commissioner Cathy Foerster c20/. Dc20 Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 31 a,,Jr11 Anchorage, AK 99501 Re: Duck Island Unit Well Renaming Request SCANNED `"!' 0 1 2016 Dear Commissioner Foerster, Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island Unit wells to remove the unused suffixes at the end of each well name. Well names currently include a forward slash "/"followed by an obsolete bottom hole location designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21" would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original and new names for all Duck Island wells. While performing the review of Duck Island well names, HAK found a single well, "DUCK IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A" label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI 4-20/134" (PTD# 1861500). The original wellbore, abandoned 10/13/1986, was sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to be one of the first sidetracks performed at Endicott. While the bottom hole code was changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also included on the attached spreadsheet. Sincerely, Wyatt Rivard Well Integrity Engineer Hilcorp Alaska, LLC CC Dave Roby Victoria Loepp . Orig • New API_WeIINo I PermitNumber' WellName I WellNumber I WeIlNumber I 50029219460600 2032160 DUCK IS UNIT SDI 3-17F/K30 3-17F 50029224630000 1940490 DUCK IS UNIT SDI 3-19/R28 3-19 50029217140000 1870330 DUCK IS UNIT SDI 3-21/L34 3-21 50029217149500 1980190 DUCK IS UNIT SDI 3-21AK35XX 3-21AXX 50029216450000 1861550 DUCK IS UNIT SDI 3-23/N32 3-23 50029221250000 1901820 DUCK IS UNIT SDI 3-25/M27 3-25 50029221250100 2010200 DUCK IS UNIT SDI 3-25A/N24 3-25A 50029221250200 2030210 DUCK IS UNIT SDI 3-25B/L27 3-25B 50029215860000 1860830 DUCK IS UNIT SDI 3-27/M33 3-27 50029221060000 1901560 DUCK IS UNIT SDI 3-29/132 3-29 50029228380000 1972270 DUCK IS UNIT SDI 3-31/K32 3-31 50029216680000 1861800 DUCK IS UNIT SDI 3-33/K37 3-33 50029216680100 2032150 DUCK IS UNIT SDI 3-33A/J35 3-33A 50029217010000 1870200 DUCK IS UNIT SDI 3-35/136 3-35 50029225540000 1950510 DUCK IS UNIT SDI 3-37/L35 3-37 50029217640000 1871160 DUCK IS UNIT SDI 3-39/339 3-39 50029217640100 1970910 DUCK IS UNIT SDI 3-39A/I37 3-39A 50029218780000 1881260 DUCK IS UNIT SDI 3-41/K39 3-41 50029224160000 1931700 DUCK IS UNIT SDI 3-43/P36 3-43 50029218110000 1880510 DUCK IS UNIT SDI 3-45/M39 3-45 50029215690000 1860640 DUCK IS UNIT SDI 3-47/Q35 3-47 50029217350000 1870600 DUCK IS UNIT SDI 3-49/140 3-49 50029217350200 1970570 DUCK IS UNIT SDI 3-49A/M40 3-49A 50029217359500 1950350 DUCK IS UNIT SDI 3-49AJ40XX 3-49AXX 50029217890000 1880220 DUCK IS UNIT SDI 4-02/028 4-02 50029219680000 1890860 DUCK IS UNIT SDI 4-04/T26 4-04 50029219680100 2090190 DUCK IS UNIT SDI 4-04A/T30 4-04A 50029217230000 1870430 DUCK IS UNIT SDI 4-06/032 4-06 50029217230100 1961660 DUCK IS UNIT SDI 4-06A/030 4-06A 50029216920000 1870080 DUCK IS UNIT SDI 4-08/P27 4-08 50029224640000 1940500 DUCK IS UNIT SDI 4-10/M28 4-10 50029224640100 2022380 DUCK IS UNIT SDI 4-10A/L28 4-10A 50029218630000 1881040 DUCK IS UNIT SDI 4-14/R34 4-14 50029218630100 2080120 DUCK IS UNIT SDI 4-14A/S-37 4-14A 50029218960000 1881490 DUCK IS UNIT SDI 4-18/530 4-18 50029216400100 1861730 DUCK IS UNIT SDI 4-20/M35 4-20A 50029216400000 1861500 DUCK IS UNIT SDI 4-20/T34 4-20 50029218350000 1880720 DUCK IS UNIT SDI 4-26/034 4-26 50029218700000 1881110 DUCK IS UNIT SDI 4-28/N37 4-28 50029225590000 1950690 DUCK IS UNIT SDI 4-32/K38 4-32 50029227050000 1961550 DUCK IS UNIT SDI 4-34/038 4-34 50029224820000 1940740 DUCK IS UNIT SDI 4-38/K34 4-38 50029222650000 1920420 DUCK IS UNIT SDI 4-40/P43 4-40 50029217310000 1870560 DUCK IS UNIT SDI 4-42/P38 4-42 50029222540000 1920190 DUCK IS UNIT SDI 4-44/M44 4-44 50029222549500 1970470 DUCK IS UNIT SDI 4-44AM40XX 4-44AXX 50029219570000 1890690 DUCK IS UNIT SDI 4-46/N39 4-46 50029219720000 1890970 DUCK IS UNIT SDI 4-48/K43 4-48 50029219400000 1890440 DUCK IS UNIT SDI 4-50/K41 4-50 Imagi" ~roject Well History File Cover('- ~ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Well History File Identifier RESCAN DIGITAL DATA Color items: J Diskettes, No. ~ Grayscale items: [] Other, No/Type Poor Quality Originals: Other: NOTES: OVERSIZED (Scannable) Maps: Other items scannable by large scanner OVERSIZED (Non-Scannable) Logs of various kinds BY: BEVERLY ROBIN VINCENT SHERY~~VINDY Project Proofing BY: BEVERLY ROBIN VINCENT SHERYL~INDY Scanning Preparation / BY: BEVERLY ROBIN VINCENT SHERY~, WINDY r'-i Other TOTAL PAGES Production Scanning Stage I PAGE COUNT FROiVI SCANNED FILE: ....... .~....~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~. YES ......... NO Stage 2 IF NO ~N STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASiSDuE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) III IIIIIIIIIII II III RESCANNEDB~'[ BEVERL.Y ROBIN VINCENT SHERYL MARIA WINDY DATE: IS~ General Notes or Comrnents about this file: Quality Checked 12/10/02Rev3NOTScanned,wpd e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LascrFiche\CvrPgs _ Inserts\Microfihn _ Marker. doc STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plug Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service , 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 201-020 "" 302-355 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22125-01 / 4. Location of well at surface 9. Unit or Lease Name 2519' SNL, 759' WEL, SEC. 08, T11N, R17E, UM '~-~ X = 270283, Y -- 5970978 Duck Island Unit/Endicott At top of productive interval ~ ?' ? ~ ~ ~-~, ~, ~ ~-? 7~,a,~.,/ N/A Attotal depth ~. ¥ '~0~.~,,~- ~-?P¢~!'?/,'~i 10. Well Number 821' NSL, 3973' WEL, SEC. 32, T12N, R17E, UM E _~ X = 267309, Y = 5979693 3-25A/N-24 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Endicott Field / Endicott Pool KBE - 55.10' ADL 312828 12. Date Spudded4/3,2001 113' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'4,10/2001 1/2/2003 115' Water depth' if °fish°re6' - 12' M SL 116' N°' °f C°mpl'eti°ns, Zero 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV set1 21. Thickness of Permafrost 14428 9983 FTI 12970 9488 FTI [] Yes [] NoI N/A MDI 1465' (Approx.) 22. Type Electric or Other Logs Run ' MWD, GR, RES ~. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 30" Surface 131' Driven 13-3/8" 68# NT-80 Surface 2448' 17-1/2" 2629 Cu ft Permafrost 9-5/8" 47# NT-80 / NT95HS Surface 13384' 12-1/4" 3448 cuft Class 'G' 7" 29# NT95HS 13141' 13571' 8-1/2" 454 cuft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) None N/A N/A , MD TVD MD TVD 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. , DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12970' P&A with 24 Bbls of Cement '~" ,, 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS'OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED O~L-BBL GAS-MCF WATER-BBL O~L GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. ;~~ ~VE D No core samples were taken. J U N 0 ~ ~003 I~1~$ BFL JtJ~ ~ 20[J~ Alaska 0il & Gas C~ns. Commission ~ Anchorage JUN ::::[ 9 2003 .... , Form 10-407 Rev. 07-01-80 ORI61NAL Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. S3A1 13615' 9968' K2.B 13625' 9975' K2 M 14290' 9993' K2B 14307' 9992' RECE VE:D JUN 0 ~ 7003 Alaska 0il & Gas C0n~;. G0m~,~issiaa Anchorage ~1. List of Attachments: Summary of Daily Drilling Reports and a Pre Rig Summary Report. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge 3-25NN-24 201-020 302-355 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Permit No. / Approval No. Drilling Engineer: Fred Johnson, 564-5427 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Fiev. 07-01-80 0 i'~i i N AL Well: 3-25B/L-27 Field: Endicott APl: 50-029-22125-02 Permit: 203-021 Date Accept: 04/07/03 Spud: 04/13/03 Release: 04/24/03 Rig: Doyon 15 PRE-RIG WORK 01/02/03 PRIME AND TEST LINES TO 4000 PSI. RIH. TEST BRIDGE PLUG TO 1500 PSI IN 4 BBLS. TAG PLUG @ 13464' CTMD. RU CEMENTERS AND BATCH MIX 25 BBLS 15.8# CMT. LAY II~_B~B~_~S/ CMT FROM CIBP TO -12970' CTMD AT 1:1. JET IN 24 BBLS BIOZAN FROM 12,850 TO'EET TOP OF CMT -12970' CTMD. REVERSE CIRCULATE OUT BIO/CMT UNTIL GETTING CLEAN RETURNS AT SURFACE PUMPING DIESEL DOWN BACKSIDE, POOH. WELL IS FREEZE PROTECTED TO 2000' WITH DIESEL, 9.4# BRINE TO CMT PLUG AT -12,970' CTMD. 01/04/03 LOG CBL USING SSLT. UNABLE TO REACH DESIRED DEPTH DUE TO RESIDUE IN BOREHOLE. DEEPEST DEPTH ACHIEVED WAS 11604'. LOG FROM 11604' TO 10000' AT 3000 FPH AND REPEAT. LOG SHOWED FREE PIPE THROUGHOUT. 01/05/03 PRESSURE TESTED CEMENT PLUG LAID BY COILED TUBING ON TOP OF 9-5/8" BRIDGE PLUG. NO TUBING IN WELL. PUMPED 10 BBLS. OF DIESEL TO PRESSURE WELL TO 3000 PSIG. 30 MINUTE TEST RESULTED IN 2900 PSIG ON CASING. OA = 400 PSIG PASSED TEST. BLEED OFF CASING AND IA TO ZERO AND TAGGED WELL AS TO TESTING DATA. CMIT IAXT @ 3000 PSI (PASSED) PUMPED 10 BBLS DIESEL. 01/07/03 MIRU TO DO DRIFT & TAG, CRANE CONTROLS WENT BAD, EXCHANGE UNITS, PRIORITY JOB ASSIGNED. 01/09/03 RAN 3.625 CENT TO 6978' WLM. SAMPLE BAILER FULL OF MUD. RAN 2.68 CENT. TO 6985' WLM. COULD MAKE NO FURTHER PROGRESS. 03/30/03 VECO CREW SET BPV IN TUBING HANGER FOR UPCOMING RIG SIDETRACK. TESTED VALVE FROM BELOW TO 1000 PSI. GOOD TEST. BP EXPLORATION Page I of 15 Operations Summary Report Legal Well Name: 3-25B/L-27 Common Well Name: 3-25B/L-27 Spud Date: 4/6/2003 Event Name: REENTER+COMPLETE Start: 4/6/2003 End: 4/24/2003 Contractor Name: DOYON DRILLING INC. Rig Release: 4/24/2003 Rig Name: DOYON 15 Rig Number: Date From - To Hours Task 'Code NPT Phase Description of Operations 4/6/2003 10:00 - 12:00 2.00 MOB 'P PRE Hold Pre-Job Safety Meeting - Rig Down Lines Between Complexes - Blow Down Rig And Skid Rig Floor - Raise Legs In Cellar Area 12:00 - 14:00 2.00. MOB P PRE Held PJSM - Move Pit And Pump Complex Away From Sub Base And Spot On Location - Move Sub Base Off Well - Load Out Matting Boards And Clean Up Location 14:00 - 16:30 2.50 MOB P PRE Held PJSM - Move Mud Pit Complex From MPI To SDI And Stage On Location 16:30 - 19:00 2.50 MOB P PRE Held PJSM - Move Sub Base Complex From MPI TO SDI 19:00 - 20:30 1.50 RIGU P PRE Held PJSM - Move Sub Base Complex Over Well No. 3-15 B / L-27 - Lower Legs And Pre Load - Close Cellar Doors 20:30 - 22:00 1.50 RIGU P PRE Held PJSM - Move Pit Complex And Spot With Sub Base 22:00 - 23:00 1.00 RIGU P PRE Held PJSM - Skid Rig Floor 23:00 - 00:00 1.00 RIGU P PRE Held PJSM - Spot Rock Washer - Rig Up Cellar Area 4/7/2003 00:00 - 06:30 6.50 RIGU P PRE Held PJSM - Berm Up Around Rig - Hook Up Utilities - Hook Up Flare And Gas Buster Lines - Switch Boiler And Turbines Over To Natural Gas - Rig Up Mud Lines, Cellar Pump, And Fill Up Lines - Hook Up Lines Under Rig Floor - Hook Up Auger To Rock Washer *Note* Doyon Rig 15 Accepted For Well Work On 3-25B / L-27 At 06:30 Hours On 04/07/2003 06:30 - 07:00 0.50 WHSUR P DECOMP Held PJSM - Rig Up DSM Lubricator And Pull BPV - Rig Down Lubricator And Clear Rig Floor 07:00 - 08:30 1.50 WHSUR P DECOMP Held PJSM - Dry Rod In TWC Valve - Install Secondary Valve On Tubing Spool - Test TWC Valve From Below To 1,000 Psi. For 10 Minutes (Test Good) 08:30 - 09:00 0.50 WHSUR P DECOMP Held PJSM - Blow Down And Rig Down All Test Lines 09:00 - 10:00 1.00 WHSUR P DECOMP Held PJSM - Bleed Down Pressure On Cameron Adapter Flange And Nipple Down Tree 10:00 - 17:30 7.50 BOPSUI; P DECOMP Held PJSM - Nipple Up Mud Cross And Riser Spool - Pick Up BOP Stack And Install On Riser Spool - Nipple Up 13 5/8" 5M BOP Stack And Related Equipment - Install Bell Nipple, Flow Line, And Fill Up Lines - Pick Up Tools And Equipment 17:30 - 18:30 1.00 BOPSUF P !DECOMP Held PJSM - Fill BOP Stack With Water - Close Blind Rams - Test From Blind Rams To Tubing Hanger At 250 Psi. Low And 4,500 Psi. High (Test Good) - Drain BOP Stack 18:30 - 20:00 1.50 PULL P !DECOMP Held PJSM - Pick Up And Make Up Landing Joint To Tubing Hanger - Verify That No Pressure Under Tubing Hanger - Back Out Lock Down Studs - Pull Hanger To Rig Floor - Break Out Landing Joint And Hanger Remove TWC - Lay Down 2 Joints 4 1/2" Tubing With Mule Shoe 20:00 - 21:30 1.50 BOPSUF P DECOMP Held PJSM - Install Cameron Test Plug - Rig Up Testing Equipment - Flush Lines With Water - Make Up Safety Valve And IBOP Valve 21:30 - 00:00 2.50 BOPSUI~ P DECOMP Hold Pre-Job Safety Meeting - Witness Of BOP Test Waived By AOGCC Inspector Chuck Sheave - Test Annular At 250 Psi. Low And 3,500 Psi. High - Test Upper And Lower Pipe Rams, Blind Rams Choke Manifold At 250 Psi. Low And 4,500 Psi. High 4/8/2003 00:00 - 02:00 2.00 BOPSUI~ P DECOMP Hold Pre-Job Safety Meeting - Continue To Test Choke Manifold, Floor Safety Valve, Dart Valve, Top Drive Upper And Lower IBOP Valves, Manual And HCR Valves On The Choke ,, Printed: 4/28/2003 9:14:27 AM BP EXPLORATION Page 2 of 15 Operations Summa Report Legal Well Name: 3-25B/L-27 Common Well Name: 3-25B/L-27 Spud Date: 4/6/2003 Event Name: REENTER+COMPLETE Start: 4/6/2003 End: 4/24/2003 Contractor Name: DOYEN DRILLING INC. Rig Release: 4/24/2003 Rig Name: DOYEN 15 Rig Number: Date From-To Hours Task Code NPT Phase Description of OPerations 4/8/2003 00:00 - 02:00 2.00 BOPSUF P DECOMP And Kill Lines At 250 Psi. Low And 4,500 Psi. High - Perform Accumulator Test 02:00 - 02:30 0.50 BOPSUF:P DECOMP Hold Pre-Job Safety Meeting - Rig Down Testing Equipment - Remove Test Plug - Install Short Bowl Protector And Energize Lock Down Studs 02:30 - 03:00 0.50 BOPSUF:P DECOMP Held PJSM - Blow Down Choke Manifold, Kill And Choke Lines 03:00 - 05:00 2.00 CLEAN P DECOMP Held PJSM - Change Out Saver Sub And Grease Seals On IBOP Accuator On Tesco Top Drive 05:00 - 07:30 2.50 CLEAN P DECOMP :Held PJSM - Make Up Mule Shoe And Single In The Hole With 64 Joints Of 5" Drill Pipe To 2013' 07:30 - 08:30 1.00 CLEAN P DECOMP 'Held PJSM - Circulate Out Diesel Freeze Protection To Tiger Tank At 4 BPM With 20 Psi. 08:30 - 09:00 0.50 CLEAN P DECOMP Held PJSM - Continue To Single In The Hole With 78 Joints Of 5" Drill Pipe From 2,013' To 2,492' ~09:00 - 10:00 1.00 CLEAN P DECOMP Held PJSM - POH With 26 Stands Of 5" S-135 Drill Pipe Standing Back In Mast 10:00 - 12:45 2.75 CLEAN P DECOMP Held PJSM - P/U (1) 6 1/4" Steel Drill Collar, Make Up Cross Over, Bit Sub, Casing Scraper, 8 1/2" Hughes MX -C1 (RR) Bit Ser No. 6008101 - Continue To P/U (8) 6 1/4" Steel Drill Collars, Cross Over 12:45 - 14:00 1.25 CLEAN N HMAN DECOMP Shut Down Operation And Clean Up Barite Material- Loader Operator Was Attempting To Lift A Pallet Of Barite Onto Trolley On Mud Pallet Lift Under Hopper Room. The Trolley Moved To The Back Of The Pallet Lift And The Loader Operator Was Attempting To Use Some Of The Weight Of The Pallet To Straighten Out The Trolley And It Moved Forward In Doing So The Forks Slipped Out Of The Pallet And Part Of The Barite Sacks Fell To The Rig Mats Below In Secondary Containment See LCIR No. 2003-1R-479877 - Contacted Enviro-Tech - Cleaned Up And Recovered All Barite Product 14:00 - 15:30 1.50 CLEAN P DECOMP Held PJSM - Continue To RIH With BHA No.1 Picking Up (15) Singles Of 5" HWDP - Steam Out Ice Plugs - Total BHA No.1 Length 740.22 15:30 - 00:00 8.50 CLEAN P DECOMP Held PJSM - RIH With Clean Out Assembly BHA No.1 Picking Up 292 Singles Of 5" Drill Pipe From 740' To 10,006' 4/9/2003 00:00 - 00:30 0.50 CLEAN P DECOMP Held PJSM - Connect Tesco Top Drive And Establish Circulation At 10,006' - RPM 20, Torque Off Bottom 7,000 ft / lbs - Pump Rate 424 gpm, SPP 1,490 psi, String Weight Up 232,000~, String Weight Down 185,000~, String Weight Rotating 210,000~ 00:30 - 02:15 1.75 CLEAN P DECOMP Held PJSM - RIH With Clean Out Assembly BHA No.1 From 10,006' To 11,991' Total Of 354 Joints 5" Drill Pipe 02:15 - 03:45 1.50: CLEAN P DECOMP Held PJSM - Connect Tesco Top Drive And Establish I Circulation At 11,991'- Pump Hi-Vis Sweep - Pump Rate 585 gpm, SPP 2,590 psi, String Weight Up 285,000~, String Weight Down 208,000~ *NOTE* When Sweep Came Back To Surface Very Little Solids Back - Well Bore Very Clean - Mix Dry Job 03:45 - 04:00 0.25 CLEAN ~ DECOMP Held PJSM - Monitor Well Bore (Static) - Pump Dry Job - Blow Down Tesco Top Drive 04:00 - 09:00 5.00 CLEAN ~ DECOMP Held PJSM - POH With Clean Out Assembly BHA No.1 - Stand Back 5" Drill Pipe In Mast From 11,991' To 740' Printed: 4/28/2003 9:14:27AM BP EXPLORATION Page 3 of 15 Operations Summa Report Legal Well Name: 3-25B/L-27 Common Well Name: 3-25B/L-27 Spud Date: 4/6/2003 Event Name: REENTER+COMPLETE Start: 4/6/2003 End: 4/24/2003 Contractor Name: DOYON DRILLING INC. Rig Release: 4/24/2003 Rig Name: DOYON 15 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/9/2003 04:00 - 09:00 5.00 CLEAN P DECOMP *NOTE* Some Drill Pipe Tool Joints Coated With Oil Soaked Barite 09:00 - 10:30 1.50 CLEAN P DECOMP Held PJSM - Stand Back BHA No.1 In Mast (5 Stands) 5" HWDP - (3 Stands) 6 1/2" Steel Drill Collars - Remove 8 1/2" Bit - Lay Down Cross Over, Bit Sub, And 9 5/8" Casing Scraper - Clear Rig Floor *NOTE* BHA Coated With Oil Soaked Barite 10:30 - 11:00 0.50 CLEAN P DECOMP Hold Pre-Job Safety Meeting With Schlumberger, Haliburton, And Rig Crew - Regarding E-Line Operation 11:00 - 12:00 1.00 EVAL P DECOMP Rig Up Schlumberger Tools And Equipment - Make Up 8 1/2" Gauge Ring, Junk Basket, And CCL - RIH With Logging Tools To 3,200' - Tagged Up, Work Tools Up And Down - Unable To Work Logging Tools Any Deeper 12:00 - 13:00 1.00 EVAL N DPRB DECOMP POH With Schlumberger Logging Tools - Note An Increase Of 1,200 lbs. Drag Above Normal Up Weight - Junk Basket Full Of Oil Wet Barite 13:00 - 13:30 0.50 EVAL N DPRB DECOMP Held PJSM - Rig Down Schlumberger Logging Tools And Equipment - Clear Rig Floor 13:30- 14:00 0.50 EVAL N DPRB DECOMP Held PJSM - Perform Upper Mast Inspection 14:00 - 14:30 0.50 EVAL N DPRB DECOMP Held PJSM - Service Rig - Top Drive - Traveling Blocks - And Crown Sheaves 14:30 - 16:00 1.50 CLEAN N DPRB DECOMP Held PJSM - Make Up BHA No.2 And RIH - Pick Up (1) Stand Of 6 1/2" Steel Drill Collars Lay Down (1) Steel Drill Collar- Pick Up 8 1/2" String Mill, Bit Sub, 9 5/8" Casing Scraper, 8 1/2" Bit And RIH - Pick Up (1) 6 1/2" Steel Drill Collar - RIH With (2) Stands Of 6 1/2" Drill Collars From Mast - Make Up Cross Over And Pick Up 6 1/4" Daily Drilling Jars - RIH With (5) Stands Of 5" HWDP From Mast - Total Length Of BHA No.2 At 778.58 16:00 - 17:00 1.00 CLEAN N DPRB DECOMP Held PJSM - RIH With BHA No.2 On 5" Drill Pipe From 778' To 4,003' 17:00 - 17:30 0.50 CLEAN N DPRB DECOMP Held PJSM - Install Full Opening Safety Valve And Head Pin - Make Up High Pressure Hose To Choke Manifold - Line Up Choke Manifold To Poor Boy Degasser 17:30- 19:30 2.00 CLEAN N DPRB DECOMP Held PJSM - Reverse Circulate 20 Barrels BaraScrub, 25 Barrels Hi-Vis Sweep At 3 BPM With 100 Psi. - When BaraScrub Turned The Corner Increase Pump Rate To 10 BPM With 750 Psi. *NOTE* Very Little Barite And Lubes Returned At Bottoms Up 19:30 - 20:00 0.50 CLEAN N DPRB DECOMP Held PJSM - Rig Down Circulating Lines And Blow Down - Remove Floor Valve And Head Pin - Consult With Anchorage Drilling Engineer 20:00 - 22:00 2.00 CLEAN N DPRB DECOMP Held PJSM - RIH With BHA No.2 On 5" Drill Pipe From 4,003' To 11,993'- Lay Down Top Single On Stand No. 118 22:00 - 22:30 0.50 CLEAN N DPRB DECOMP Held PJSM - Install Full Opening Safety Valve And Head Pin - Make Up High Pressure Hose To Choke Manifold - Line Up Choke Manifold To Poor Boy Degasser 22:30- 00:00 1.50 CLEAN N DPRB DECOMP Held PJSM - Reverse Circulate 20 Barrels BaraScrub, 25 Barrels Hi-Vis Sweep At 12 BPM With 1,890 Psi. 4/10/2003 00:00 - 00:30 0.501 CLEAN N DPRB DECOMP Continue To Reverse Circulate 20 Barrels BaraScrub, 25 Printed: 4/28/2003 9:1,4:27 AM BP EXPLORATION Page 4 of 15 Operations Summa Report Legal Well Name: 3-25B/L-27 Common Well Name: 3-25B/L-27 Spud Date: 4/6/2003 Event Name: REENTER+COMPLETE Start: 4/6/2003 End: 4/24/2003 Contractor Name: DOYEN DRILLING INC. Rig Release: 4/24/2003 Rig Name: DOYEN 15 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/10/2003 .00:00- 00:30 0.50 CLEAN N DPRB DECOMP Barrels Hi-Vis Sweep At 12 BPM With 1,890 Psi. *NOTE* Very Little Barite And Lubes Retumed At Bottoms Up 00:30 - 01:00 0.50 CLEAN N DPRB DECOMP Hold Pre-Job Safety Meeting With Little Red Hot Oil Services, Doyen Rig Crews And Baroid Mud Engineers Regarding Pumping Operation 01:00 - 02:00 1.00 CLEAN N DPRB DECOMP Pressure Test Surface Lines To 1,000 Psi. For 5 Minutes (Test Good) - Pump 25 Barrels HI-Vis Spacer - Shut Down And Remove Head Pin - Hook Up Little Red Services To Head Pin And Pump 100 Barrels Of 185 Degree Diesel- Final Circulating Pressure At 800 Psi. - Shut In Full Opening Safety Valve 02:00 - 04:45 2.75 CLEAN N DPRB DECOMP Held PJSM - Break Out Head Pin And Pick Up Single Of 5" Drill Pipe - Connect Tesco Top Drive And Pressure Up To 800 Psi. - Open Full Opening Safety Valve - Up Weight At 285K, Down Weight At 205K, Rotating Weight At 235K - Rotate Drill String At 60 RPM - Continue Pumping 25 Barrel Hi-Vis Spacer, 25 Barrel BaraScrub, 25 Barrel Hi-Vis Spacer, Followed Up With Seawater *NOTE* Lots Of Lubes Back On Bottoms Up - After Bottoms Up Rotary Torque Increased From 11K To 23K, String Up Weight Increased To 31 OK, String Down Weight Decreased To 212K 04:45 - 05:00 0.25 CLEAN N DPRB DECOMP Held PJSM - Rig Up To Reverse Circulate 05:00 - 09:00 4.001 CLEAN N DPRB DECOMP Held PJSM - Reverse Circulate 25 Barrels, Hi-Vis Spacer 55 Barrels 185 Degree Diesel, 25 Barrels BaraScrub, 25 Barrels Hi-Vis Sweep Followed With Sea Water At 7 BPM With 710 Psi. - Increasd Rate To 14 BPM With 2,100 Psi. *NOTE* Minimal Of Lubes Back On Bottoms Up 09:00 - 09:30 0.50 CLEAN N DPRB DECOMP Held PJSM - Pump Dry Job - Blow Down Top Drive - Choke Manifold - Choke And Kill Lines 09:30 - 15:00 5.50 CLEAN N DPRB DECOMP Held PJSM - POH With Clean Out Assembly BHA No.2 - Stand Back 5" Drill Pipe In Mast From 11,993' To 778' 15:00 - 16:30 1.50 CLEAN N DPRB DECOMP Held PJSM - Stand Back (5) Stands Of 5" HWDP - Lay Down Daily Drilling Jars - Stand Back (2) Stands 6 1/2" Steel Drill Collars - Place (1) 6 1/2" Steel Drill Collar In Mousehole - POH With (2) 6 1/2" Steel Drill Collars - Break And Lay Down Cross Over, 8 1/2" String Mill, Bit Sub, 9 5/8" Casing Scraper, And 8 t/2" Bit - Pick Up (1) 6 1/2" Drill Collar From Mousehole And Stand Back (1) Stand Of Drill Collars - Clear Rig Floor *NOTE* BHA Clean From Lubes And Barite, Minimal Amount Located In Spirals On Drill Collars 16:30 - 17:00 0.50 EVAL N DPRB DECOMP Hold Pre-Job Safety Meeting With Schlumberger, Halliburton, And Rig Crew - Regarding E-Line Operation 17:00 - 19:30 2.50 EVAL P DECOMP Rig Up Schlumberger Tools And Equipment - Make Up Collar Locater, Weight Bar, And EZSV Running Tool - Make Up Halliburton EZSV And RIH With Logging Tools To 11,500' With No Problems - Record Up Weights Every 1,000 Feet - Log Up From 11,500' To 9,800' Unable To Detect Good Collar Signals And Marker Joint Location - Re-Log Again With Same .... Printed: 4/28/2003 9:1,4:27 AM BP EXPLORATION Page 5 of 15 Operations Summa Report Legal Well Name: 3-25B/L-27 Common Well Name: 3-25B/L-27 Spud Date: 4/6/2003 Event Name: REENTER+COMPLETE Start: 4/6/2003 End: 4/24/2003 Contractor Name: DOYON DRILLING INC. Rig Release: 4/24/2003 Rig Name: DOYON 15 Rig Number: Date From - To Hours ' Task Code NPT Phase Description of Operations 4/10/2003 17:00- 19:30 2.50 EVAL ~P DECOMP Results 19:30 - 21:30 2.00 EVAL !N DPRB DECOMP Held PJSM - POH With Halliburton EZSV On Schlumberger Logging Tools - Change Out Collar Locator And Test On Surface - Check Out Haliburton EZSV (OK) 21:30 - 22:30 1.00 EVAL , N . DPRB DECOMP Held PJSM - Logging Run No.2 - RIH With Collar Locator, Weight Bar, And EZSV Running Tool To 11,500' With No Problems - Good Collar Detection To 10,000' - Poor Quality To 11,600' 22:30 - 00:00 1.50 EVAL 'P DECOMP Log Up From 11,600' To 9,800' Poor Collar Signals - Re-Log Again At Different Speed With Same Results - Correlate Logs With GR Log 4/11/2003 00:00 - 00:30 0.50 EVAL P DECOMP Correlate Logs With GR Log - Log Up To Packer Setting Depth At 11,320 (Top Of Packer WLM) 5' Above Collar And Set Haliburton EZSV With 2,930 lbs. On Weight Indicator *NOTE* Felt 2 Movements On E-Line Not 3 - Indicated Tool Not Released - Waited 10 Minutes 00:30 - 01:00 0.50 EV^L N DFAL DECOMP Held PJSM - Clear Rig Floor- Pull Up On Setting Tool Above Normal Up Drag At 2,930 lbs. To 4,000 lbs. - Slack Off To 1,900 lbs. Verify That Packer Set - Pull Up To Neutral Weight At 2,930 lbs. And Wait 10 Minutes - Consult With Day Companyman And Decide To Pull Out Of Rope Socket - Stage Up Pulling Weights Repeatedly And Pulled Out With 7,289 lbs. - 78 Percent Of Line Rating 01:00 - 02:30 1.50 EVAL N DFAL DECOMP Held PJSM - POH With Schlumberger E-Line - Verify That Wire Indeed Pulled Out Of Rope Socket - Top Of Fish At 11,304.5' (WLM) *NOTE* Items Left In Hole: Rope Socket O.D. 2 1/4" Length 1.80 CCL 3 3/8" O.D. Length 2.30 AH-ESlC 50 3 3/8" O.D. Length 1.80 Weight Bar 3 3/8" O.D. Length 6.60 EZSV Running Tool 7 3/4" O.D. Length 3.0 ~Total Length Of Fish In Hole At 15.50 02:30- 03:00 0.50 FISH N DFAL DECOMP Held PJSM - Change Out Dies In Top Drive And Service Same - Move 6 1/2" Drill Collars On Pipe Rack 03:00 - 04:30 1.50 FISH N DFAL DECOMP Held PJSM - Pick Up And Make Up Baker Fishing Tools - Pick Up (1) Stand Of 5" HWDP And Lay Down Single - Pick Up Pump Out Sub, Bumper Jars, Top Sub, Extension, Over Shot Bowl And Guide Dressed With 3 3/8" Grapple - RIH With Fishing Assembly - Pick Up Single Of 5" HWDP - RIH With (4) Stands Of 5" HWDP From Mast - Total BHA No.3 Length At 478.14 04:30 - 08:30 4.00 FISH N DFAL DECOMP Held PJSM - RIH With BHA No.3 On 5" Drill Pipe From 478' To 11,248' 08:30 - 09:00 0.50 FISH N DFAL DECOMP Held PJSM - Connect Tesco Top Drive And Establish Circulation At 5 BPM With 200 Psi. - String Weight Up 285,000~, String Weight Down 185,000~ - Wash Down To Top Of Fish - Note Pressure Increase To 1,000 Psi. At 11,333' (DPM) - Shut Down Pumps And Set Down 15,000~ To Ensure Fish Engaged - Pick Up To 310,000~ Sheared EZSV Running Tool From Bridge Plug - Pick Up String To 11,313'- Set Back Printed: 4/28/2003 9:14:27 AM BP EXPLORATION Page 6 of 15 Operations Summar Report Legal Well Name: 3-25B/L-27 Common Well Name: 3-25B/L-27 Spud Date: 4/6/2003 Event Name: REENTER+COMPLETE Start: 4/6/2003 End: 4/24/2003 Contractor Name: DOYON DRILLING INC. Rig Release: 4/24/2003 Rig Name: DOYON 15 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/11/2003 08:30 - 09:00 0.50 FISH N DFAL DECOMP Down At 11,333' With 15,000~ To Ensure Bridge Plug In Place (OK) 09:00 - 10:00 1.00 FISH N DFAL DECOMP Held PJSM - Dropped Ball And Pumped Open Circulating Sub With 1,300 Psi. - Pump Dry Job - Blow Down Top Drive 10:00 - 14:30 4.50 FISH N DFAL DECOMP Held PJSM - POH With BHA No.3 On 5" Drill Pipe From 11,333' To 478' 14:30 - 15:30 1.00 FISH N DFAL DECOMP Held PJSM - Stand Back (5) Stands Of 5" HWDP - Pull Fish To Rig Floor Recovered 100 Percent - Break Out Fish From Over Shot And Lay Down - Break And Lay Down Over Shot, Bumper Sub, And Pump Out Sub - Clear Rig Floor i 15:30 - 16:30 1.00 CLEAN P DECOMP Held PJSM - Pressure Tested 9 5/8" Casing And Halliburton Bridge Plug At 3,000 Psi. For 30 Minutes (Test Good) 16:30 - 19:00 2.50 STWHIP P WEXlT Held PJSM - Pick Up Whipstock And Milling Assembly BHA No.4 - Pick Up (1) Joint Of 5" HWDP - Make Up Upper String Mill, Lower String Mill, Starting Mill And RIH - Pick Up (1) Non Mag Flex Collar, And Float Sub - Pick Up Bumper Sub, Non Mag UBHO Sub, TM Non Mag Hang Off Collar - Orient MWD Tools - Pick Up Window Master Whipstock With Bottom Trip Anchor And RIH - Install Cross Over And RIH With (3) Stands Of 6 1/2" Steel Drill Collars - Install Cross Over And Rill With (5) Stands Of 5" HWDP - Total Length Of BHA No.4 At 854.81 19:00 - 19:30 0.50 STWHIP P WEXIT Held PJSM - Connect Tesco Top Drive - Test Sperry Sun MWD Tools At 420 GPM With 850 Psi. (Test Good) - Blow Down Top Drive 19:30 - 00:00 4.50 STWHIP;P WEXIT Held PJSM - RIH With BHA No.4 On 5" Drill Pipe From 854' To 9,418'- Fill Drill String Every 30 Stand On Trip In Hole 4/12/2003 00:00 - 01:00 1.00 STWHIPiP WEXIT Held PJSM - Continued To RIH With BHA No.4 From 9,814' To 11,304' - Connected Top Drive And Established Circulation 12 BPM With 1,540 Psi. 01:00 - 02:00 1.00 STWHIP' P WEXIT Held PJSM - String Weight Up 310,000~, String Weight Down 195,000~ - Worked String To Orient Whipstock Slacked Off And Tripped Anchor With 22,000~ - Whipstock Set At 51 Degrees Right Of High Side - Picked Up On String 10,000~ Above Neutral Weight to Verify That Whipstock Set - Slacked Off 40,000~ To Sheared Retaining Bolt. *NOTE* Tagged Bridge Plug With Bottom Of Whipstock At 11,344' (DPM) 02:00 - 03:30 1.50 STWHIP P WEXlT Held PJSM With Truck Drivers, Drilling Crews, And Service Personal Regarding Mud Displacement - Pumped 80 Barrel 9.7 PPG Hi-Vis Spacer Followed Up With 9.7 PPG GEM Mud At 12 BPM With 1,650 Psi. 03:30 - 09:00 5.50 STWHIP P WEXlT Held PJSM - Recorded Slow Pump Rates w/New Mud System, String Weight Up 240,000~, String Weight Down 180,000~, String Rotating Weight 225,000#, Pump Rate 545 GPM, 2,150 Printed: 4/28/2003 9:14:27 AM BP EXPLORATION Page 7 of 15 Operations Summa Report Legal Well Name: 3-25B/L-27 Common Well Name: 3-25B/L-27 Spud Date: 4/6/2003 Event Name: REENTER+COMPLETE Start: 4/6/2003 End: 4/24/2003 Contractor Name: DOYON DRILLING INC. Rig Release: 4/24/2003 Rig Name: DOYON 15 Rig Number: Date From- To Hours Task Code NPT Phase Description of Operations 4/12/2003 03:30 - 09:00 5.50 STVVHIP P WEXlT Psi. RPM 100, Torque 14,000 ft / lbs - 17,000 ft/Ibs. Milled Window in 9-5/8" Casing from 11,320' - 11,336', WOM 5,000# - 10,000#, RPM 100, Torque 22,000 ft / lbs, Pump Rate 546 gpm, 2,150 psi. Exited Window at 11,336'. Continued To Mill Formation From 11,336' To 11,350', WOM 10,000# - 12,000#, RPM 100, Torque 22,000 f~ / lbs, Pump Rate 545 gpm, 2,150 psi. Observed Cement At Shakers While Milling At 11,329'. Recovered 155 lbs. Of Metal During Milling And Stack Flushing Operation. *NOTE*: Top Of Window 11,320' Bottom Of Window 11,336' 09:00 - 10:00 1.00 STWHIP P WEXlT Held PJSM - Pumped 30 Barrel Hi-Vis Sweep At 13 BPM With 2,110 Psi. Circulated Until Returns over Shakers were Clean. 10:00 - 10:30 0.50 DRILL P WEXlT Held Pro-Job Safety Meeting - Pulled BHA Into Casing. R / U Circulating Head and Hose. Closed Upper Pipe Rams and Preformed FIT To 12.0 PPG EMW Strokes Pmp'd Pressure 5 130 psi 6 200 psi 10 300 psi 11 350 psi 12 400 psi 15 500 psi 17 580 psi 19 680 psi 21 740 psi 23 810 psi 25 880 psi 27 950 psi 29 993 psi Held Test F/10 minutes w/10 psi Pressure Loss. MW 9.7 ppg, Csg Shoe TVD 8,304' Pressure 993 psi = 12.00 PPG. EMW. Bled Pressure To 0 Psi. - Opened Pipe Rams. 10:30 - 11:00 0.50 STWHIP P WEXlT Held PJSM - Pumped Dry Job - Blew Down 2" High Pressure Circulating Line - Removed Head Pin And Full Opening Safety Valve - Connected Tesco Top Drive. 11:00 - 12:30 1.50 STWHIP P I WEXlT Held PJSM - Slipped And Cut 60' Of 1 3/8" Drilling Line - Serviced Rig And Tesco Top Drive 12:30 - 17:30 5.00 s'rVVHIP P WEXIT Held PJSM - POOH w/5" DP From 11,300' To 854' 17:30 - 19:30 2.00 STWHIP P WEXlT Held PJSM - Stood Back (5) Stands Of 5" HWDP In Mast - Removed Cross Over And Laid Down (9) 6 1/2" Steel Drill Collars, Broke Cross Over And Laid Down Bumper Sub, UBHO Sub, TM MWD Tool, Float Sub, (1) Joint Of 5" HWDP, Upper String Mill, Lower String Mill, And Window Starting Mill - Cleared Rig Floor Of Milling Tools 19:30 - 20:30 1.00 STWHIP P WEXlT Held PJSM - Picked Up BOP Stack Flushing Tool With Magnet And Flushed BOP Equipment - Operated Rams And Reflushed - Recovered 5 lbs. Of Metal On Magnet - Laid Down Magnet And Flushing Tool 20:30 - 23:00 2.50 DRILL P PROD1 Held PJSM - M / U BHA No.5 - Picked Up 7.0" Sperry Drill Lobe 7/8 - 6.0 Stage Motor w/1.50 Degree Bend - Picked Up Printed: 4/28/2003 9:14:27 AM ,, BP EXPLORATION Page 8 of 15 Operations Summary Report I Legal Well Name: 3-25B/L-27 Common Well Name: 3-25B/L-27 Spud Date: 4~6~2003 Event Name: REENTER+COMPLETE Start: 4~6~2003 End: 4~24~2003 Contractor Name: DOYON DRILLING INC. Rig Release: 4~24~2003 Rig Name: DOYON 15 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/12/2003 20:30 - 23:00 2.50 DRILL P PROD1 (1) 6 3~4" Non Mag Flex Drill Collar - M / U (1) Non Mag Integral Blade Stabilizer, Float Sub and Mud Motor - P / U TM MWD Non Mag Hang Off Sub - Orient MWD Tools To Motor And Installed Smith 8 1/2" PDC SGR89HSVPX Bit -Serial No. JS7517 Dressed With The Following Nozzles (4) 1 l's And (4) 12's - P / U (3) 6 5/8" Non Mag Flex Drill Collars, Daily Hydraulic Drilling Jars, And (5) Joints Of 5" HWDP - Connected Tesco Top Drive And Surface Tested MWD Tools At 430 GPM With 980 Psi. (Test Good) - Blew Down Top Drive - RIH With (5) Stands Of 5" HWDP From Mast - Total Length Of BHA No.5 - 809.78' 23:00 - 23:30 0.50 DRILL P PROD1 Held PJSM - Adjusted Mechanical Brakes On Draw Works - Washed Off Rig Floor 23:30 - 00:00 0.50 DRILL P PROD1 Held PJSM - RIH With Directional BHA No.5 on 5" DP From 809' To 1,400' 4/13/2003 00:00 - 04:30 4.50 DRILL P PROD1 Held PJSM - RIH With Directional BHA No.5 on 5" DP From 1,400' To 11,290' - Fill Drill String Every 25 Stands 04:30 - 05:00 0.50 DRILL P I PROD1 Held PJSM - Connected Top Drive And Established Circulation - String Weight Up 270,000~, String Weight Down 205,000#. Oriented Motor - Shut Down Pumps And Worked Thru Window From 11,320' To 11,336'. 05:00 - 05:30 0.50 DRILL P PROD1 Held PJSM - Established Circulation At 11,340' - Washed And Reamed Under Gage Hole From 11,344 To 11,350'. Pump -- -'"'------~------~-- Rate 474 .g..~, 2,040 ps_L. 05:30 - 00:00 18.50 DRILL P PROD1 Drilled 8 1/2" ~~le By Rotating And Sliding From __---:~:~_.,~.(.!_. 11,350' To 12,220' WOB Rotating 10,000~ - 22,000~, WOB Sliding 10,000~ To 15,000~, RPM 60 To 70, Motor//RPM 156, L.~.~-r.2_ ~// Torque Off Bottom 14,000 ft / lbs - On Bottom 16_/000 ft / lbs, Pump Rate 541 gpm, SPP Off Bottom 2,650 p~ On Bottom 2,860 psi. String Weight Up 280,000~, String/Weight Down 195,000~, String Weight Rotating 225,000~/~RT = 8.36 Hrs, AST = 8.09 Hrs. ~ 4/14/2003 00:00 - 02:30 2.50 DRILL P PROD1 Drilled 8 1/2" Directional Hole By Rotatin,~'And Sliding From 12,220' To 12,351' WOB Rotating 10,0~0~ - 22,000~, WOB Sliding 25,000~ To 30,000~, RPM 60,/To 70, Motor RPM 156, Torque Off Bottom 14,000 ft / lbs - ~ Bottom 16,000 ft / lbs, Pump Rate 541 gpm, SPP Off Bot~m 2,650 psi, On Bottom 2,860 psi. String Weight Up 280,/0'00~, String Weight Down 195,000~, String Weight Rotati,,Cg 225,000~ 02:30 - 03:30 1.00 DRILL N HMAN ~PROD1 At 02:21 Hours The Derrickm/a'n Notified The Driller To Shut Down The Mud Pumps Due,/To The Liner Gasket Leaking On The Number 1 Mud Pump/ZPrior To Pulling Off Bottom The Mud Motor Stalled And T~e Pump Pressure Increased To 3,400 Psi. - The String/Was Raised And The Mud Pumps Were Shut Down - Number,/' Mud Pump Was Isolated And The Driller Started To P,~fnp With The Number 2 Mud Pump At 11 BPM With 1,800 P~'~aer Was Working The Pipe Attempting To IVl~ke ATool Set To Continue On With Directional Wo/~k Per Sperry Sun - The Driller Rotated The String And W,~s Supposed ToHit The Switch On The Drillers Tesco ConSol Panel To Close The Grabber On The Tool Joint But Inste~l Closed The IBOP Valve Causing The Rotary Hose To Rupt, a're - According To Sperry Sun Insite Readings Max / Printed: 4/28/2003 9:14:27 AM Permitto Drill 2010200 MD 14428 'T'VD DATA SUBMITTAL COMPLIANCE REPORT 4/18~2003 Well Name/No. DUCK IS UNIT SDI 3-25A/N24 Operator BP EXPLORATION (ALASKA) INC 9983 -~ Completion Dar 4/22/2001 ~-~ Completion Statu SUSP Current Status SUSP APl No. 50-029-22125-01-00 UIC N REQUIRED INFORMATION Mud Log N._9 Sample Nc) Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type ~ Fmt (data taken from Logs Portion of Master Well Data Maint) Interval Log Log Run Name Scale Media No Start Stop OH I Dataset CH Received Number Comments Directional Survey FINAL Directional Survey FINAL Lis Verification FINAL Directional Survey FINAL Directional Survey FINAL 10271 FINAL 10277 FINAL 13529 14368 13571 14428 13571 14428 13529 14368 Open 9/7/2001 1~277 Open 9/17/2001 d-~0271 oh 5/18/2001 oh 5/18/2001 oh 9/7/2001 oh 5/18/2001 oh 5/18/2001 OH 9/712001 ~,,,,0,271 oh 9/7/2001 11~77 13529-14368 13571-14428 Directional Survey Paper Copy Survey Digital ~'~ Directional Data Lis Verification Directional Survey Digital Data Directional Survey Paper Copy 13571-14428 DIGITAL (~ DATA 13529-14368 digital data Well Cores/Samples Information: Name Interval Start Stop Sent Received Dataset Number Comments ADDITIONAL INFORMATION Well Cored? Y I'~ Chips Received? ~ Analysis Y / N Daily History Received? Formation Tops ON Permit to Drill 2010200 MD 14428 Comments: TVD DATA SUBMITTAL COMPLIANCE REPORT 41'18~2003 Well Name/No. DUCK IS UNIT SDI 3-25A/N24 Operator BP EXPLORATION (ALASKA) INC 9983 Completion Dat 4/22/2001 Completion Statu SUSP APl No. 50-029-22125-01-00 Current Status SUSP UIC N Compliance Reviewed By: Date: ~ ~ /~ ~a:~J ~? STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well 1'3 Pull Tubing [] Variance [] Other // [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2519' SNL, 759' WEL, SEC. 08, T11N, R17E, UM At top of productive interval N/A At effective depth 5278' NSL, 3712' WEL, SEC. 05, T11N, R17E, UM At total depth 821' NSL, 3973' WEL, SEC. 32, T12N, R17E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 55.10' 7. Unit or Property Name Duck Island Unit/Endicott 8. Well Number 3-25AJN-24 9. Permit Number 201-020 / 10. APl Number 50-029-22125-01 11. Field and Pool Endicott Field / Endicott Pool 12. Present well condition summary Total depth: measured 14428 feet true vertical 9983 feet Effective depth: measured 13488 feet true vertical 9874 feet Casing Length Structural Conductor 92' Surface 2409' Intermediate Production 13345' Liner 1009' Size 30" 13-3/8" 9-5/8" 7" Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None Plugs (measured) Junk (measured) P&A Bridge Plug at 13488' MD Set ClBP and Whipstock at 13587' MD Lost 6" BHNDrilling Assy. Top at 13494' Cemented MD TVD Driven 131' 131' 2629 cu. ft. Permafrost 2448' 2383' 3448 cu. ft. Class 'G' 13384' 9805' 454 cu. ft. Class 'G' (Top of Window) 13141' - 13571' 9619' - 9936' RECEIVED NOV 1 9 2002 commissiol Alas~ 0il.& Gas (~ns. Anchorage 13. Attachments [] Description Summary of Proposal 4. Estimated date for commencing operation December 1, 2002 /' 16. If proposal was verbally approved Name of approver Date Approved Contact Engineer Name/Nurnbec Fred Johnson, 564-5427 [] Detailed Operations Program [] BOP Sketch Status of well classifications as: [] Oil [] Gas [] Susp/ended Service Prepared By Name/Number: Sondra Stewman, 564-4750 17. I hereby certify that the fj)regojng i,s t,~e and correct to the best of my knowledge _ Signed Fred Johnson J~.,~¢~/,~~/~'~ Title Senior Drilling E?gineer Date ////uc/.~¢¢.Z..! Conditions of Approval: Notify Commission_ .~ rep'resentative may.wltn~s .................. I' _" ....,., ' '_ .... ^pprova~ r~o ~. Plug integrity X BOP Test,/~ Location clearance I ;----; ~ "' Mechanical lntegrity Test __ Subsequent form required l0- ¢..jO'~ 'T'E%'('- ~>,0~ ~o Approved by order of the Commission ORIGINAL all Commissioner Date Form 10-403 Rev. 06/15/88 ~FjDIi~S BFL :: .. :! :'',~ .: .. i:i ~.tol! 2 5 ?~lq? Submitlrf'Tripli6ate : bp To: Winton Aubert Date: 11/18/2002 AOGCC From: Fred Johnson Subject: Endicott 3-25A/N-24 Application for Sundry Permit - Re-enter Well for Sidetrack Operations APl: 50-029-22125-01 AOGCC approval is requested to re-enter the Endicott 3-25A/N-24 in preparation for a sidetrack to a new bottom hole location. Endicott well 3-25A/N-24 is presently a suspended well following,'"' an unsuccessful sidetrack attempt in 2001. The well is planned to b~.sidetracked to a new bottom hole location as a conventional producer targeti, pg the Kekiktuk K2A' lower subzone reservoir. The sidetrack is currently scheduled for Doyon 15 beginning around February 15th. The pre-rig work for this sidetrack is planned to begin no later than December 1,2002. The pre-rig P&A operations plan is to cap the 7" bridge plug (13,488'), and 7" liner top (13,141') with a CTU set cement plug~/The drilling rig would then move on, pull the tubing hanger, mill a window at +/-11500' in the 9-5/8" casing, drill an 8-1/2~, hole to the new bottom hole location, run and cement a 4-1/2" liner, and run a 4-1/2" completion.' See attached schematics for details. Sidetrack and Completion Procedure Summary Pre-Ri.q Work: * Notify the field AOGCC representative with intent to plug and abandon * 1. Pressure test the tubing hanger seals to 5000 psi for 30 minutes. Completed 10/10/2002. Tubing hanger seals tested to 5000 psi for 30 minutes. All tubing hanger Iockdown screws were functioned. 2. Pressure test the 9-5/8" FMC casing hanger packoff to 3000 psi for 30 minute~.Completed 10/10/2002. Casing hanger packoff tested to 3000 psi for 30 minutes 3. RIH with CTU and set a P&A cement plug using 15.8 lb/gal c~.t. ~lse ad,e,,quate ceme~nt volume to fill the 7" liner from the bridge plug at 13488' up to/1305P.!i..in the 9-5/8 casing. 4. Tag and document top of cement. ~''''' 5. Displace well to seawater. Freeze protect the well to 2000' Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000 psi. Secure well. 6. Prep the well house, cleanout cellar, and rig down the flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. · Rig Operations: 1. MIRU Doyon 15. 2. Pull BPV. Set TWC & test from below. 3. Nipple down tree. Alignment marks should be made before removinq the old tree. Nipple up and test BOPE to 250 / 5000 psi. Pull TWC. 4. Pull and lay down tubing hanger and 2 joints of 4-1/2" tubing. 5. RIH with full gauge whipstock mill on 5" drill pipe to 12000'. Circulate out freeze protect. 6. RU e-line. Run and set a 9-5/8" bridge plug to position top of whipstock at +/- 11500'. 7. MU 9-5/8" whipstock and milling assembly and RIH with 5" DP. Orient and set whipstock on bridge plug. Mill window in 9-5/8" casing. 8. MU 8-1/2" PDC drilling assembly including MWD/GR. RIH to window. 9. Kick-off and drill the 8-1/2" hole section as per directional plan to TD at +/-14305" MD (10,338' TVD). Trip for triple combo LWD prior to the Kekiktuk. Condition hole for running liner, spot liner running pill, and POOH. 10. Run and cement a 4-1/2", 12.6 Ib/ft 13 Cr-80 production liner. Release from liner and set liner top packer. Test wellbore to 2000 psi to verify liner top packer is set. Displace well to seawater. 11. Run 4-1/2", 12.6 Ib/ft 13 Cr-80 gas lift completion. Space-out tubing so the WLEG is inside the 4-1/2" liner tie-back sleeve. RU slickline and make drift run thru liner hanger to verify proper spaceout. 12. Drop ball/rod & set packer. Test the tubing to 3000 psi and annulus to 3000 psi for 30 minutes. 13. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 14. Freeze protect to 2000' MD and secure the well. 15. Rig down and move off. Post-Riq Work: 1. RU slickline. Pull the ball and rod / RHC plug from 'XN' nipple below the production packer. Install gas lift valves. 2. RU e-line. Perforate -50' of Kekiktuk interval with 2-7/8" guns. Estimated Pre-rig Start Date: 12/1/2002 Estimated Spud Date: 02/15/2003 Fred Johnson Drilling Engineer 564-5427 II · TREE: 4-1/16" /5000 psi /McEv(~' ¢3akerActuator , R.T. E LEV --- 55.1 ' WELLHEAD: 13-5/8" /5000 psi~lV, _voy)~, B.F. EEEV -- 15.28' MAX. DEV. -- 55:10 M D 840 O' 2 Joints 4-1/2" NSCT Tubing , 13-3/8" 68#/ft, NT80 CYHE BUTT CSG I 24 48' I Casing filled with Diesel 0-1500' 9.4 lb/gal Brine 1500'-13488' I 9-5/8", 4 7#/ft NT80S XO to NT95 HS TOP o~ ?" T~WL~NER 9-5/8", 47#/ft, NT95HS, NSCC '1'1,"/x, , k P&A Bridge Plug at 13488' ~~ I 6" hole drilled to 144,29' MD, I Window Milled at 13571 '-13591' Whipstock set at 13571' Bridge Plug Set at 13587' PER FORATI NG SUM M,~XRY Ref. LOg:sPFMWD-GRiNTERVAL(2-10-91 ) STATUS !~ ~ ~' ~ ~ ~'~'"~-- "' "": "' 'SIZE ', X X X X' ' 4-1/2 4 13,732-13,752 Sqzd ' X X X 4-1/2 4 13,852-13,883 Sqzd X X I P&ACmt Plug 13685'-13892'(2001) J 3 3/8" 4 13,905'-13,91 5 Sqzd X X 3 3/8" 4 13,915'-13,925 Sqzd X X Existing perforations P&A'd during P BT D 14 060' f ": "'"' ': ": :, pre-rig operations in 2001 7"' 29#/ft' NT95 NS I TKC 14150' Date By Comments ENDICOI'T WELL: 3-25A/N-2Z~ 2/12/91 PGS PROPOSED COMPLETION APl NO. 50-029-22125-01 3/28/91 JLH INITIAL PRESENT COMPLETIDN DIAGRAM 10/29/93 RSA RWO COMPLETION , 11/13/02 FJ Present Well Condition BP EXPLORATION (ALASKA), INC TREE: 4-1/16" /5000 psi /McEv_~r'' ~3akerActuator WELLHEAD: 13-5/8" /5000 psi i~, .voy) 13-,3/8", 68#/ft, NT80 CYHE BUTT CSG 9-5/8", 4 7#/ft NT8 0S XO to NT95 HS 396' TOP OF 7" TIWLINER 13141 ' I 9-5/8", 4 7#If t, NT95 HS, N SCC Window Milled at 13571 '-13591' Whipstock set at 13571' Bridge Plug Set at 13587' PER FORATING SUM MARY Ref. Log: MWD-GR (2-10-91) SIZE SPF INTERVAL STAT US 4-1/2 4 13,732-13,752 Sqzd 4-1/2 4 13,790-13,840 Sqzd 4-1/2 4 13,852-13,883 Sqzd 3 3/8" 4 13,905'-13,91 5 Sqzd 3 3/8" 4 13,915'-13,925 Sqzd PBT D 14 060' 7", 2 9#/ft, NT95 HS I TKO 14150' II ,::¥ x x x x~ . xxxx XXXX XXXX XXX~ XXX~ XXX XXX~ R.T. E LEV ---- 55.1 ' B.F. ELEV = 15.28' MAX. DEV. =55:10 MD 8400' 2 Joints 4-1/2" NSCT Tubing Casing filled with Diesel 0-1500' 9.4 lb/gal Brine 1500'-13488' Proposed cement plug 13,050'- 13,488' P&A Bridge Plug at 13,488' I6" hole drilled to 14,429' MD I Left BHA Fish 13,491'-13,623I ::: I P &ACmt Plug 13685'-13892' (2001) Existing perforations P&A'd during pre-rig operations in 2001 Date 2/12/91 3/28/9 1 10/2 9/93 11/18/02 PGS JLH Comrnen ts PRO POSED COMP LETION INITIAL RWO COM PL ET I ON Proposed Pre-rig P&A ENDICOTT WELL: 3-25A/N-24 APl NO... 50-029-221 25-01 PROPOSED P&A DIAGRAM BP EXPLORATION (ALASKA), INC II THE ~E: 4-1/16" /5000 psi /McEv(~~ .... 13aker Actuator (4.- R.T. E LEV = 55.1' WELLHEAD: 13-5/8" /5000 psi I~ roy) B.F. ELEV = 15.28' ..... '~~ MAX. DEV. = 55:10 I 8400' M.D. I i ~ i ' I I O I__,__' __ SSSV LANDING NIPPLE ]500' OTIS (3.813" I.D.) 13-3/8", 68#/ft, NT80 CYHE BUTT CSG W/SSSV IN MIN I.D. 2.0" I2448' I '~ ~' '-~ - 4-1/2" 12.6 Ib/ft 13 Chome 80 Vam Ace Tbg I I -- 4-1/2" Selective X Nipple 3.813" I I , ~' 'r~ .9_5,8. BAKFR S-;3 PACKFR AT 10320' i ! ! ! 4-1/2" Selective X Nipple 3.813" I I · [] 4-1/2" No Go XN Nipple 3.75" I I Top of 4-1/2" Liner 11350' ~~~ I~1 Baker 9-5/8"x7" FL Liner Hgr & LTP AT 11350' L '~ 8-1/2,, HOLE x 4-1/2" LINER 9-5/8" 47 Ib/ft N 80 XO to NT95HS at 11396' I ~ ~ CR HYDRIL 563 LINER 9-5/8' Whipstock Window at 1150~/',,~i:'?':','i'i '.,,,'i :,':', .i .,,,:,, ,, / ....... ,~., "1'~ ' 9-5/8" 47 Ib/ft NT95 HS, NSCC at 13384 ~ i~ Baker Bdd§e Plu§ set at 13488' , /' 7" Window 13571'-13583' . X X 6" hole drilled to 14,429' MD Existing perforations P&^'d dudng Left BH^ fish in hole 13491'-13623' pro-rig operations in 2001 Well suspended I I PBTD ( 14060' ~~' .':i~ 7", 2 9#/ft, NT95 HS . TKC 14150' ~""' ': :: Date By Comments ENDICO'I-r WELL: 3-25B/L-28 2/12/91 PCS PROPOSED COMPLETION APl NO~. 50-029-22125-1;12 3/28/91 JLH INITIAL PROPOSED COMPLE'EION DIAGRAM 10/29/93 RSA RWO COMPLETION 08/19/02 FJ Proposed New SIT Completion BP EXPLORATION (ALASKA), INC WELL LOG TRANSMITTAL To: State of Alaska August 29, 200 l Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska RE: MWD Formation Evaluation Logs - 3-25A / N-24, AK-MM-10097 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22125-01 RECEIVED SEP 0 7 2001 Alaska Oil & Gas Cons. Comm'm~ion Anchorage c~ 0/-©d c3 WELL LOG TRANSMITTAL To: State of Alaska August 31, 2001 Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 MWD Formation Evaluation Logs' 3-25A/N-24, AK-MM-10097 3-25A/N-24: Digital Log Images 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 Date: BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 RECEIVED SEP 0 7 2001 Aia~a Oil & Gas Cons. Commi~ion STATE OF ALASKA ( ALASKA' OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 201-020 301-100 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 . ~.~,6,,~.,,'~-'.--~,-~ 50-029-22125-01 4. Location of well at surface ~ - 9. Unit or Lease Name 2519' SNL, 759' WEL, SEC. 08, T11 N, R17E, UM '~' Duck Island Unit/Endicott At top of productive interval '..~2~',.0./'_ it~~~.~' N/A '~ ..... 10. Well Number At total depth ' _,.Z~..i_ _ i '~ ' 821' NSL, 3973' WEE, SEC. 32, T12N, R17E, UM , j~,. ,,. 3-25A/N-24 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial NC~: ...... : .... 11. Field and Pool Endicott Field / Endicott Pool KBE = 55.10' ADL 312828 12. Date Spudded4/3/2001 113' Date T'D' Reached 114' Date COmp'' Susp'' °r Aband'4/10/2001 4/22/2001 115' water depth' if °ffsh°re6' - 12' M S L 116' NO' of C°mpletionsze re 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)119. Directional Survey 1 20. Depth where seeM setl 21. Thickness of Permafrost 14428 9983 FTI 13488 9874 FT [] Yes [] No N/A MDI 1465' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 30" Surface 131' Driven 13-3/8" 68# NT-80 Surface 2448' 17-1/2" ;'629 cu ft Permafrost 9-5/8" 47# NT-80/NT95HS Surface 13384' 12-1/4" 3448 cu ft Class 'G' 7" 29# NT95HS 13141' 13571' 8-1/2" 454 cu ft Class 'G' , 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 60' (Approx.) N/A MD TVD MD TVD (Kill String) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL/MD/ AMOUNT & KIND OF MATERIAL USED 13488' Set Cement Retainer 1500' Freeze Protect with Diesel 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A 'bate of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Sasing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL IOIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED MAY I ,1 Z001 Al~_~ka Oil & P~S Cons. Commission Form 10-407 Rev. 07-01-80 Anchorage Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. S3A1 13615' 9968' K2B 13625' 9975' K2M 14290' 9993' K2 B 14307' 9992' RECEIVED 1 1 001 Alaska Oil & Gas Cons. Cornmissio0 Anchorage , 31. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble .~"~.~ ~, Title TechnicalAssistant Date.0~'°/O"O) 3-25A/N-24 201-020 301-100 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No./Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 BP EXPLORATION Page 1 of 14 Operations Summa Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 3/15/2001 00:00 - 00:00 24.00 MOB PRE Prepare for Rig Move, Waiting on Production to prepare 3-25A wellbore. '3/19/2001 00:00 - 10:00 10.00 MOB PRE Thawed out Hydralic system, rigged up and skidded rig floor over well. 10:00 - 13:00 3.00 RIGU PRE ACCEPTED RIG AT 1000 HRS 03-19-2001. Took seawater into pits rigged up hard line from annulus on 3-25A to tubing side of 3-23. Continued preping rig. 13:00 - 19:00 6.00 RIGU PRE PJSM - Rigging up on Tree and Pulling BPV. Rigged up on Tree. Rigged up lubricator from Drill Site Maintenance. Attempted to pull BPV. Master valve on tree froze. Thaw out valve with steam. Pull BPV. 19:00 - 21:30 2.50 RIGU PRE PJSM - Test line to tree - Tested line to tree to 2000 ok. Master valve on 3-23 froze could not get shut completely. Thawed out with steam, valve closed. Opened flow line valves on 3-23 to 3-25A. Union leak on line. Closed valves bleed off pressure, tightened up union. Opened valves. 21:30 - 00:00 2.50 RIGU PRE PJSM - Circulating between 3-25A and 3-23 Flowine - Circulated seawater @60 spin at 1125 psi. 3/20/2001 00:00 - 05:00 5.00 KILL DECOMP Displace seawater with 9.5 brine 9639 stks 05:00 - 06:00 1.00 WHSUR DECOMP Freeze protect 3-23 - RID hardline from 3-23 to 3-35A. 06:00 - 09:30 3.50 WHSUR PERS DECOMP Wait on DSM to set TWC 09:30- 11:00 1.50 WHSUR DECOMP R/U Lubicator, set TWC, RID Lubicator. 11:00 - 12:30 1.50 WHSUR DECOMP PJSM - N/D tree, N/U BOP's, test - Test TWC to 5000 ps, N/D tree 12:30 - 23:00 10.50 BOPSUF DECOMP PJSM - N/U BOP's, test same - Nipple up riser, spacer spool, BOP's. 23:00 - 00:00 1.00 BOPSUF DECOMP PJSM - Testing of BOP equip. - Attempt to test Blinds - spacer spool - riser against TWC - leak on spacer spool flange to riser - Tighten up - attempt test again - no test - leak - retighten retest - no test - flange leaking. Unbolt flange to pick up. 3/21/2001 00:00 - 00:30 0.50 BOPSUF DECOMP Attempted to test stack and found leak on bottom of spacer spool to riser leaking. Attempted to tighten 3 times without success. 00:30 - 02:00 1.50 BOPSUF.BARR DECOMP Break apart flange to check ring gasket and groves on flange face. Flange on riser pitted. Cleaned up flanges and replaced new ring gasket. 02:00 - 02:30 0.50 BOPSUF BARR DECOMP Tested blind rams 250 psi Iow and 5000 psi high. 02:30 - 03:30 1.00 BOPSUF.BARR DECOMP Attempt to test top varible bore rams. Rams leaking. Function rams and retest. Failed. Test annular and had slow leak. Open annular. 03:30 - 06:00 2.50 BOPSUF.BARR DECOMP Opened doors on top rams and found 4-1/2" x 7" rams instead of 3-1/2" X 6". Opened bottom rams and found 5" rams instead of 3-1/2" rams. Installed 3-1/2" rams in bottom and left 4-1/2" X 7" in top. 06:00 - 12:00 6.00 BOPSUF BARR DECOMP Installed 5" test joint and tested all rams and valves to 250 psi Iow for 5 minutes and 5000 psi high for 10 minutes. Tested annular preventor to 250 Iow for 5 minutes and 3500 psi high for 10 minutes. 12:00 - 14:00 2.00 BOPSUF DECOMP Installed 3-1/2" test joint and tested bottom rams to 250 psi Iow for 5 minutes and 5000 psi high for 10 minutes. Tested annular preventor to 250 psi Iow for 5 minutes and 3500 psi high for 10 minutes. Rigged down testing equipment. Right to witness test waived by John Crisp, Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page 2 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code .... 3/21/2001 12:00- 14:00 2.00 BOPSUF DECOMP AOGCC Inspector. 14:00 - 15:30 1.50 WHSUR DECOMP Rigged up DSM lubricator. Attempted to pull TWC. Unable to screw into TWC. 15:30 - 17:30 2.00 WHSUR THGR DFCOMP Rigged down lubricator. Picked up 2 joints of drill pipe and ran in hole to top of tubing hanger and washed out rust and scale from top of TWC. Rigged up lubricator and screwed into TWC. Backed out 'rwc and had 100 psi of pressure under TWC. Bleed off pressure and pulled TWC out of hole. Rigged down and released DSM. 17:30 - 18:00 0.50 PULL OTHR DECOMP Pick up 1 joint 5"+ 5" 10' pup, XO, RIH screw into tubing hanger. 18:00 - 21:00 3.00 PULL OTHR DECOMP Back out lock down pins - pull to 245K on tubing unseat from hanger, set slips, break out 5" dp pup. R/U Schlumberger - P/U tool - attempt to run in hole - will not pass tool joint on 5" dp. LID tool - R/D Schlumberger - P/U 5" dp pup make up, land tubing back on hanger. Break out 1 joint 5" dp, pup, XO, lay down. 21:00 - 22:00 1.00 PULL DECOMP P/U 4 1/2" landing joint - screw XO on top for pack off - Screw landing joint into tubing hanger - pull to 245K, set slips. 22:00 - 23:00 1.00 PULL DECOMP R/U up Schlumberger - P/U tool - Arm tool. 23:00 - 00:00 1.00 PULL DF_COMP Run in hole with chemical cutter 3/22/2001 00:00 - 01:00 1.00 PULL DECOMP RIH with chemical cutter to 13150. 01:00 - 02:00 1.00 PULL DECOMP Correlate tool on depth - fire cutter in middle of 1st joint above the packer - no indication of firing - 300lbs line pull that was not seen during correlation of tools through that same section. 02:00 - 03:00 1.00 PULL DECOMP POH with tools - RID Schlumberger sheave - latch on to landing joint. Pick up to check wt. Tbg not free. Pulled to 290 S/O 220 03:00 - 04:00 1.00, PULL DECOMP Work tubing from 290 to 220 to see if can work apart. No success. 04:00 - 06:00 2.00 PULL LINE DECOMP Set slips with 245K - R/U schlumberger sheave - prepare 2nd charge - P/U tools - RIH make up packoff. 06:00 - 08:30 2.50 PULL LINE DECOMP Continued running in hole with chemical cutter. Correlated with packer and located 10' below previous shot at 13060'. Fired chemical cutter and had good surface indication of tool firing. 08:30 - 10:30 2.00 PULL LINE DECOMP Pulled out of hole with wireline. Rigged down Schlumberger. 10:30 - 13:00 2.50 PULL DECOMP Picked up on tubing and verified tubing was cut. Pick up weight 210K. Circulated bottoms up at 7 bpm at 350 psi. Had some gas with bottoms up. 13:00 - 15:00 2.00 PULL DECOMP Laid out tubing hanger and spacer pup. Changed bails and rigged up tubing tongs and compensator for laying down chrome tubing. 15:00 - 15:30 0.50 PULL DECOMP Rig Service 15:30 - 23:00 7.50 PULL DECOMP Laying down 4 1/2" chrome tubing. Total of 17 metal clamps and 4 SS bands recovered from SSSV control line. 23:00 - 23:30 0.50 PULL DECOMP PJSM meeting on procedures for laying down tubing. 23:30 - 00:00 0.50 PULL DECOMP Laying down 4 1/2" chrome tubing. 106 joints laid down at midnight. 3/23/2001 00:00 - 14:00 14.00 PULL DECOMP Finished laying down 4-1/2" chrome tubing along with 7 GLMs and X-Nipples - Total joints laid down 326 jts of 1 cutoff joint 24' long - No indication of first chemical cut. Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page 3 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25NN-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 312312001 14:00 - 15:30 1.50 RIGD DECOMP Rig down 4 1/2" tubing handling equipment. 15:30 - 16:00 0.50 BOPSUF DECOMP Install test plug 16:00 - 19:30 3.50 BOPSUF DECOMP Change bottom rams from 3 1/2" to 3 1/2 x 6" variable - Test rams against 3 1/2" and 5" test joints. 19:30 - 20:00 0.50 BOPSUF DECOMP pull test plug - set wear ring 20:00 - 23:00 3.00 RIGU DECOMP PJSM - picking up overshot assembly / dp - Make up BHA 23:00 - 23:30 0.50 CLEAN DECOMP circ through BHA 23:30 - 00:00 0.50 PULL DECOMP TIH with dp in derrick 3/24/2001 00:00 - 08:30 8.50 PULL DECOMP RIH with overshot assembly to top of fish at 13065' 08:30 - 09:00 0.50 PULL DECOMP Broke circulation and recorded up weight 345K down weight 230K rotating weight 280K. Pumping 7 bpm at 450 psi. 09:00 - 09:30 0.50 PULL DECOMP Latched fish and pulled 60K over pick up to set grapples. Slack off to 5-10K over rotating weight and rotated anchor out of packer with 18 rounds to the right. 09:30 - 12:30 3.00 PULL DECOMP Circulated bottoms up and had gas with bottoms up. Test 5 ppm H2S at shaker with bottoms up. PH dropped for 9 to 6.5. Circulated and treated brine to bring up PH. 12:30 - 20:30 8.00 PULL DECOMP Mixed and pumped slug - Observed well-negative - Pulled out of hole with overshot assembly - service break overshot - Lay down tools. 20:30 - 00:00 3.50 PULL DECOMP P/U milling assembly - run in hole with BHA - Con't rih with 5" dp. 3/25/2001 00:00 - 01:00 1.00 PULL DECOMP PJSM (cutting drl line) Slip and cut dig line 01:00 - 03:30 2.50 PULL DECOMP con't run in hole to 13088' 04:00 - 07:00 3.00 PULL DECOMP high torque, stalling out, add EP lube, circ around. 07:00 - 15:30 8.50 PULL DECOMP ,Milling on packer at 13088' - packer fell 5' to 13093' pushed 30' to -13123 mill one more hour with no movement. 110 to 150 RPM - 5 to 40K - 30 to 100 stks - 15:30 - 18:00 2.50 PULL DECOMP circ high vis sweep around 18:00- 00:00 6.00 PULL DECOMP PJSM (tripping) .Flow check well - pump slug - pooh for spear. 3/26/2001 00:00 - 00:30 0.50 PULL DECOMP Con't pooh with milling assy. 00:30 - 01:00 0.50 PULL DECOMP Break milling assy - lay down/clean junk basket's 01:00 - 05:30 4.50 PULL DECOMP p/u spear - rih with spear to 13088'. 05:30 - 07:30 2.00 PULL DECOMP Circ bottoms up at 100 spm (10 bpm) @ 2500 psi. No gas with bottoms up. PU weight 340K SO weight 240K. 07:30 - 08:00 0.50 PULL DECOMP Tag top of fish at 13119'. Slow pumps to 20 spm at 1400psi. Observed 3ressure increase to 2000 psi. Shut down pumps and bleed pressure. Set down 45K on fish. Picked up and checked for drag. Sat back down with 60K down. Picked up and checked for drag. No increase in pick up. 08:00 - 10:00 2.00 PULL DECOMP CBU up at 100spm (10bpm) at 2500 psi. No indication of gas or mud with bottoms up. Checked flow- negative. 10:00 - 17:00 7.00 PULL DECOMP Pumped slug and pulled out of hole with fishing spear assembly. Did not recover fish. Showed damage on pack-off but no indication that the grapples were inside the fish. Removed packer assembly 17:00 - 18:00 1.00 PULL REME DECOMP 'MU mill on spear assembly. 18:00 - 18:30 0.50 PULL REME DECOMP Rig service. 18:30 - 23:30 5.00 PULL REME DECOMP tih with mill and spear assembly to 13090'. 23:30 - 00:00 0.50 PULL REME DECOMP Slip and cut drilling line. 3/27/2001 00:00 - 01:00 1.00 PULL DECOMP Finished cutting and slipping drill line and adjusting brakes. Printed: 5/1/2001 10:11:08 AM =, BP EXPLORATION page 4 of 14 Operations Summa Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 3/27/2001 00:00 - 01:00 1.00 PULL DECOMP 01:00 - 01:30 0.50 PULL REME DECOMP Broke circulation and established pump rate at 70 spm 1300 psi. PU weight 340K SO weight 230K. Rotating RPM 70 torque 23,000 ftlbs. 01:30 - 02:00 0.50 PULL REME DECOMP Mill on fish. Milled from 13118'-13124' (6') taking weight and some torque through the 6' milled. Slack off without restriction to the stop on the spear to 13134'. Pump pressure increased from 1300 psi to 1900 psi after slacking off to no go. Shut down pump. Picked up to check weight and drag. No indication of increase PU weight. Start pump at 50 spm @ 750 psi. Slack off to neutral weight. Work Left hand torque into string 9 rounds. Slack off to no-go. 02:00 - 03:30 1.50 PULL REME DECOMP Bring pump up to 70 spin 1900 psi, increase of 600 psi over original 1300 psi that was first established. Picked up to check weight. Drag of 10 to 50K over original pick up weight. Circululated bottoms up. 03:30 - 16:00 12.50 PULL DECOMP Flow check-negative. Slug drill pipe and pulled out of hole with 5" drill pipe. Lay down packer and fishing tools. RIH and lay down 6.25" DC's 16:00 - 16:30 0.50 STWHIP PROD1 PU 4 3/4" tools off skate. 16:30 - 17:00 0.50 STWHIP PROD1 Service rig 17:00 - 18:00 1.00 STWHIP PROD1 Pick up BHA #4. Junk subs, mill, Oil jars :18:00 - 18:30 0.50 S'I'WHIP PROD1 Service top drive. 18:30 - 00:00 5.50 STWHIP PROD1 Pick up 9 dc's and 120 its 3 1/2" drill pipe. 3/28/2001 00:00 - 00:30 0.50 STVVHIP PROD1 Finished picking up 3-1/2" drill pipe. 00:30 - 03:30 3.00 STWHIP PROD1 'Ran in hole with 5" drill pipe from the derrick and 3-1/2" clean out string to 13230'. 03:30 - 04:00 0.50 S'I'WHIP PROD1 Broke circulation and recorded drilling parameters and slow pump rates. Rotating weight 250K SO weight 210K PU weight 340K. 04:00 - 05:00 1.00 STWHIP PROD1 Washed from 13230'-13298'. Tagged top of cement to 13298'. 05:00 - 10:30 5.50 STWHIP PROD1 Drilled soft cement from 13298'-13689'. Rotary torque 23000 ftlbs, PU weight 340K SO weight 210K Rotating weight 280K. 10:30 - 14:30 4.00 STWHIP ~PROD1 Pumped sweep and circulated up annulus. Pumped 30 bbl spacer and displaced with 9.6 ppg LSND mud. 14:30 - 22:00 7.50 STWHIP PROD1 Pump slug and POOH w/5" DP. Take torque and drag information every 10 stands. Test choke manifold to 300 psi Iow and 5000 high on trip out. Witnessing of BOPE test waived by Lou Gramaldi of AOGCC. 22:00 - 22:30 0.50 S'I'WHIP PROD1 Switch handling tools to 3 1/2" DP. 22:30 - 00:00 1.50 STVVHIP PROD1 POOH with 3 1/2" DP. At BHA. 3/29/2001 00:00 - 01:00 1.00 STWHIP PROD1 Lay down Clean out BH^. 01:00 - 01:30 0.50 STVVHIP PROD1 Pull wear ring and install test plug. 01:30 - 09:30 8.00 STWHIP PROD1 Test BOPE. 3 1/2" on Annular 250/3500psi. 3 1/2" on rams 250/5000 )si. 5" on annular 250/5000 psi and on rams 250/5000 psi. Floor valves, choke valves and IBP's 250/5000 psi. Witnessing waiver by ^OGCC Lou Gramaldi. 09:30 - 10:30 1.00 STWHIP LSET PROD1 Spot and rig up Schlumberger wireline truck. 10:30 - 16:00 5.50 STWHIP' LSET PROD1 PU CIBP and RIH. Could only make it to 13325'. Needed to go to Printed: 5/1/2001 10:11:08AM BP EXPLORATION Page 5 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 !Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 iContractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 3/29/2001 10:30 - 16:00 5.50 STVVHIP LSET PROD1 13587'. POOH and LD ClBP. RD and release Schlumberger Wireline. CIBP covered with mud residue. 16:00 - 17:30 1.50 ST1NHIP LSET PROD1 Move drill collars. PU CIBP on 3 1/2" DP. 17:30 - 18:00 0.50 STWHIP LSET PROD1 Service top drive. 18:00 - 00:00 6.00 STWHIP LSET PROD1 RIH with CIBP on 3 1/2" DP, XO, 5" DP. PU 270k SO 220k. Preparing to set CIBP at 13587'. 3/30/2001 00:00 - 00:30 0.50 STWHIP LSET PROD1 Set ClBP at 13587'. 15 rounds, pull 50k over, 20k down, 50 k over, 20k down. Neutral. 10 rounds and free from ClBP. 220k SO and 270k PU. 00:30 - 03:30 3.00 STWHIP LSET PROD1 Circulate and condition mud. Mud in very bad shape. Apparent EP Lube and Cement contamination. 03:30 - 04:00 0.50 STWHIP LSET PROD1 Test casing to 2500 psi for 30 minutes. 04:00 - 04:30 0.50 STVVHIP LSET PROD1 Slip and cut drilling line concurrent with pressure test. 04:30 - 08:30 4.00 STWHIP LSET PROD1 POOH to 7816'. Descision to return to bottom to work on mud. 08:30 - 12:00 3.50 STVVHIP LSET PROD1 RIH to 13587'. Tag CIBP. PU 4' to condition mud. 12:00 - 19:30 7.50 STWHIP LSET PROD1 Circulate and condition mud. Attempting tp reduce CL's and get mud weight evened back out. Apparent EP mud lub and Cement contamination. 19:30 - 21:15 1.75 STWHIP LSET PROD1 Circulate 2 weighted sweeps. No solids up with sweeps. 21:15 - 22:30 1.25 STWHIP' LSET PROD1 Spot viscous pill in 7" liner. 22:30 - 23:30 1.00 STWHIP LSET PROD1 Pull 6 stands to get out of liner. 23:30 - 00:00 0.50 STWHIP LSET PROD1 Pump dry job and prepare to trip out of hole. 3/31/2001 00:00 - 00:30 0.50 ST'WHIP LSET PROD1 Pump slug and blow down top drive. 00:30- 04:00 3.50 STWHIP LSET PROD1 POOH with 5" DP. 04:00 - 04:30 0.50 STWHIP LSET PROD1 Change to 3 1/2" handling tools. 04:30 - 06:00 1.50 STWHIP LSET PROD1 POOH with 3 1/2" DP. Lay down CIBP setting tool. clear floor. 06:00 - 08:30 2.50 ST'WHIP PROD1 Make up MWD and Mills and align same. Make up Whipstock and RIH. 08:30 - 10:30 2.00 STWHIP PROD1 PU 5 jts HWDP. Test MWD, OK. PU rest of BHA. 10:30 - 15:30 5.00 STWHIP PROD1 RIH with 3 1/2" and 5" DP to 13532'. 15:30 - 16:30 1.00 STWHIP PROD1 Break circulation and orient Whipstock to 15 degrees left of high side., tag ClBP, set trip anch w/15k, PU 5k, set down and shear mills.w/30k. Obtain SPR's. 16:30 - 20:30 4.00 STVVHIP PROD1 Mill 13571' to 13585'. Stop due to contaminated mud returns. 7.5 bpm at 2300 psi. 50/60 rpm, 14,000 ftlb torque, 2/4k wob initially. 20:30 - 21:30 1.00 STINHIP COND PROD1 C&C mud. 21:30 - 00:00 2.50 STWHIP PROD1 Mill from 13585 to 13586'. Mill slowed down due to formation or wear. 4/1/2001 00:00 - 01:30 1.50 STWHIP 'PROD1 Milling at13585 to 13586'. Not making adequate headway. 01:30 - 04:00 2.50 STWHIP BHA PROD1 Circulate around 2 sweeps to clean up metal cuttings. 04:00 - 04:30 0.50 STVVHIP BHA I PROD1 Observe well for flow, Pump Slug for trip. 04:30 - 08:30 4.00 STWHIP BHA PROD1 Pull out of hole with 5" DP and 3 1/2"DP. 08:30 - 10:00 1.50 STWHIP BHA PROD1 Stand back 3 1/2" HWDP and 4 3/4" DC's. LD lower mill and pilot mill, and MWD. 10:00 - 11:00 1.00 STWHIP BHA PROD1 PU new starter mill, bit sub and upper mill. RIH with 3 1/2" HWDP and 4 3/4" DC's. 11:00 - 16:30 5.50 STWHIP BHA PROD1 RIH with 3 1/2" DP and 5" DP to 13,554'. 16:30 - 18:00 1.50 STWHIP PROD1 Mill from 13585' to 13587'. All of the opened hole and 1' of new formation. 18:00 - 20:30 2.50 STWHIP COND PROD1 Circulate and condition mud. Acute problem with barite falling out. 20:30 - 00:00 3.50 STVVHIP PROD1 Mill from 13587' to 13589'. 4/2/2001 00:00 - 01:00 1.00 STWHIP PROD1 Mill 13589 to 13591' to get upper mill further out of window while mixing new mud and circulating. 01:00 - 10:30 9.50 STWHIP COND PROD1 Circulate while preparing to displace hole with new mud. Mix spacers and mud at rig. Baroid mud plant mixing mud and being hauled to Printed: 5/1/2001 10:11:08 AM .. BP EXPLORATION Page 6 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Date From -To Hours Task Sub Phase Description of Operations Code 4/2/2001 01:00 - 10:30 9.50 STWHIP COND PROD1 location. Due to weather conditions the haul capacity is being affected. 10:30 - 15:00 4.50 STWHIP COND PROD1 Displace hole with 30 bbl 11 ppg walnut sweep, 10 bbl drill n slide, 10 bbl H20, 30 bbl 11 ppg walnut sweep, followed by 9.7 ppg LSND mud at 54 vis. Flow check. Pump dry job. 15:00-21:00 6.00 STWHIP COND PROD1 POOH w/ 5" DP. Becamewet. Another slug did not work either. Pull wet. 21:00-22:30 1.50: STWHIP COND PROD1 POOHw/3 1/2"wet. 22:30 - 23:30 1.00 STWHIP COND PROD1 Lay down 14 HWDP, 9 DC's and mills. 23:30 - 00:00 0.50 STWHIP PROD1 PJSM on PU BHA. Begin with PU motor and set bend and orient sleeve. 4/3/2001 00:00 - 00:30 0.50 STWHIP PROD1 Cleared floor. Laid down Baker tools. 00:30 - 04:00 3.50 DRILL PROD1 PJSM. Made up BHA, Set Bent sleeve on Motor to 2.127 bend. Make up MWD and oriented. Up Loaded MWD data, P/U jars and PBL sub. 04:00 - 12:00 8.00 DRILL PROD1 Tripped in hole w/3 1/2" DP, Filed every 25 stands. Tested MWD at 5,375'. RIH w/5" DP to 13,085'. 12:00 - 13:30 1.50 DRILL PROD1 PJSM. Slipped and cut drilling line. (last cut before changing out drilling line) 13:30 - 14:00 0.50 DRILL PROD1 RIH w/5" to 13,473'. 14:00 - 14:30 0.50 DRILL PROD1 Broke circulation and oriented tool face 157 left, RIH past top of Whipstock at 13, 571'. Cleaned out to13,591'. P/U weight 280,000#, S/O weight 210,000#. 14:30 - 16:00 1.50 DRILL PROD1 Drilled by sliding to build angle from 13,591 to 13,621'. (30' of new hole before FIT) ADT slide 1 hr 35 mins. P/U weight 280,000#, S/O weight 220,000#. SPP 1,700 psi off bottom, 1,850 psi on bottom at 230 gpm. ;16:00 - 18:00 2.00 DRILL PROD1 Circulated and conditioned hole for FIT. MW in 9.7 ppg, MW out 9.7 PPg. 18:00 - 18:30 0.50 DRILL PROD1 PJSM. Performed FIT to 11 ppg equivalent. 9.7 ppg mud in hole, 672 3si surface pressure with TVD at 9936'. Pressure held steady for 10 minutes. OK. 18:30 - 00:00 5.50 DRILL PROD1 Directionally drilled by sliding from 13,621' to 13,764'.(143') ADT 2 hrs 20 mins. P/U weight 300,000#, S/O weight 220,000#, SPP 1,700 psi off bottom and 1,850 psi on bottom at 230 gpm. Motor RPM= 125. Total drilled today 173' in 3 hrs 55 mins of sliding. Note: Held Spill drill and D-2 drill. Good crew response. 4/4/2001 00:00 - 02:00 2.00 DRILL PROD1 Directionally drilled by sliding from 13,764' to 13,815'.(51') ADT 40 mins. P/U weight 300,000#, S/O weight 220,000#, SPP 1,700 psi off bottom and 1,850 psi on bottom at 230 gpm. Motor RPM= 125. Total drilled today 51' in 40 mins of sliding. 02:00 - 09:00 7.00 DRILL BAR PROD1 Circulate bottoms up. ECD approached 11 ppg. Pull to13,087'. Barite falling out of mud. Mixing barite to keep mud weight up. (mixed approximetly 1000 sacks) Barite falling out up in 9 5/8 casing. Circulate and condition mud. 90 spm at 2700 psi. 09:00 - 13:00 4.00 DRILL 'BAR PROD1 Flowline plugged and leaked into cellar area(5 gallon) Unplug flow line and put back together. 13:00 - 17:30 4.50 DRILL BAR PROD1 Circulate at 90 spm 2500 psi. Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page 7 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 " Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/20.01 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code .4/4/2001 17:30 - 18:30 1.00 DRILL BAR PROD1 Work to unplug flow line and clean blinded shaker screens. 18:30 - 00:00 5.50 DRILL BAR PROD1 Circulate at reduced rates(50-75) due to screen blinding. Go to rock washer and return liquids via vac truck. Install jet in flow line. Blend 200 bbl 9.7 mud from mud plant into system. Rotate and work pipe at 20 rpm. More mud due from plant and mixing 140 bbl at rig. Start trq 675, PU 270, SO 215. @00:00: trq 650, PU 260, SO 240, rot 230. 4/5/2001 00:00 - 17:30 17.50 DRILL BAR PROD1 Circulated to clean hole and to condition mud. Pump rates 3 bpm to 7 bpm, SPP 1,000 psi - 1,600 psi. Pump rates varied due to flowline plugging and large quantity of barite going into rock washer. Jetting flow line occasionnaly to prevent complete plugging. Bled 200 bbl 9.7 mud into system. Rotated and worked pipe at 20 rpm. 17:30 - 19:00 1.50 DRILL BAR PROD1 Shut down to clean up screens and flow line. 19:00 - 19:30 0.50 DRILL BAR PROD1 Production Gas monitors in cellar alarm went off. Evacuate personnel. Contact Production. Cleared as false alarm. Return to rig. H2S drill. 19:30 - 21:00 1.50 DRILL BAR PROD1 Cleaned area and changed out screens. Those on shaker to plugged to cleanup. Screen up scalper shakers with 20 mesh. 21:00 - 23:00 2.00 DRILL BAR PROD1 Circulated at 1~)0 spm 2000 psi.(10 bpm). Quite a bit of material after about 2/3 bottoms up. PU 275k, SO 215K, ROT 240K. Bleeding in 10.5 ppg mud. Mud returns at 9.2 ppg. No new mud around. 23:00 - 23:15 0.25 DRILL BAR PROD1 Shut down and cleaned shaker screens. Changed scalers to 40 mesh. 23:15 - 00:00 0.75 DRILL BAR PROD1 Circulated at 100 spm..9.3 ppg out 9.2 ppg in. Bleed 130 bb110.5 ppg mud in system. Still getting a substantial amout across shakers. Barite from down hole loosened up from rotating and recipicating. 4/6/2001 00:00 - 03:00 3.00 DRILL BAR PROD1 Circulated at 100 spin. Reciprocated and Rotated at 20 rpm. Mud weight 9.2 ppg out 9.4 ppg in. Bled 10.5 ppg mud into system. The returns across shakers decreased. Barite from down hole loosened up from rotating and reciprocating. 03:00 - 04:15 1.25 DRILL BAR PROD1 Crew change. PJSM. Cleaned shaker screens and surface equipment. 04:15 - 10:00 5.75 DRILL BAR PROD1 Circulated at 100 spin. Reciprocated and Rotated at 20 rpm. Mud weight 9.4 ppg out 9.4 ppg in. Bled 10.5 ppg mud into system. The returns across shakers decreased. 10:00 - 10:30 0.50 DRILL BAR PROD1 Dropped closing ball for PBL sub and circulated to bottom at 60 spm SPP 900 psi. PBL sub closed, Pump rate 60 spm, SPP 1,650 psi. 10:30 - 11:00 0.50 DRILL BAR PROD1 Circulated and attempted to orient motor. No pulse from MWD. Began circulation rate at 60 spm, SPP 1,650. In 30 minutes SPP decreased to 1,300 psi. 11:00 - 13:00 2.00 DRILL BAR PROD1 Dropped opening ball for PBL sub. Circulated at 60 spm, SPP 1,300 psi. Could not get PBL sub to open. SPP decreased to 1,100 psi. Decision made to POOH. PBL sub possibly washed out. 13:00 - 16:30 3.50 DRILL PROD1 Observed well, well static. Pumped dry job and POOH with 5" DP to 8800'. 16:30 - 17:30 1.00 DRILL WCON PROD1 Driller observed possible pit gain. Flow checked well, observed small flow. Shut well in. SIDPP 0 psi, SICP 0 psi. 17:30 - 20:00 2.50 DRILL WCON PROD1 Circulated to kill the well using the Drillers method. Circulated through the choke at 40 spm and held 650 psi on the drill pipe with 150 psi on the casing. Drill pipe pressure increased to 750 psi as slug was circulated into annulus. Reduced drill pipe pressure back to 650 psi, casing pressure went to 0 psi. Circulated a total of 456 bbls, Bottoms up from PBL sub. Shut down pump and closed choke. SIDPP 0 psi, SlCP 0 psi. Opened choke and observed well, well static. Opened BOP's and observed well, well static. (After POOH, found PBL sub washed out and plugged below circulating port. Circulation was Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page 8 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPEETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Date From -To Hours Task Sub Phase Description of Operations Code 4/6/2001 17:30 - 20:00 2.50 DRILL WCON PROD1 occurring out of wash out in PBL. No flow to BHA. This slowed the dry job to fall out, giving the appearance of flow) 20:00 - 21:30 1.50 DRILL WCON PROD1 Ci.rculated slug out of well. Held a safety meeting to discuss operation and assure crew that they followed proper procedure in shutting the well in. Observed well, well static. 21:30 - 23:00 1.50 DRILL PROD1 POOH with 5" DP. 23:00 - 00:00 1.00 DRILL PROD1 Observed well, well static. POOH with 3 1/2" DP. BHA at surface at -' report time. Tested choke manifold on trip out. Witnessing BOP test waived by John Spaulding of AOGCC. 4/7/2001 00:00 - 01:30 1.50 DRILL BAR PROD1 Finished POOH to MWD. 01:30 - 02:30 1.'00 DRILL BAR PROD1 Sperry-Sun made up data link to MWD and down loaded data. 02:30 - 03:00 0.50 DRILL BAR PROD1 Laid Down BHA. 03:00 - 03:30 0.50 DRILL PROD1 Pulled wear bushing. Rigged up and set BOP test plug. 03:30 - 08:30 5.00 DRILL PROD1 Held Pre-Job Safety Meeting. Pressure Tested BOPE. 3 1/2" on Annular 250/3500psi. 3 1/2" on rams 250/5000 psi. 5" on annular 250/5000 psi and on rams 250/5000 psi. Floor valves, choke valves and IBP's 250/5000 psi. All tests held with not leaks or pressure loss. Witness of BOP test waiver by John Spaulding of AOGCC. 08:30 - 09:00 0.50 DRILL PROD1 Pulled Test Plug and ran wear bushing. 09:00 - 14:00 5.00 DRILL PROD1 M / U HTC STX 20D bit w/4 x 18 jets onto motor. Changed out pulser and battery in MWD. Adjusted bent housing on motor to 1.50 degree and Oriented t,o MWD. PU Dailey Jars, RIH w/BHA #4, Test MWD pulser, ok. 14:00 - 16:00 2.00 DRILL PROD1 RIH with 3 1/2" DP" fill pipe and test MWD tools. 16:00 - 16:30 0.50 DRILL PROD1 Changing to 5" DP tools. MWD tools not sending up correctly. Orders to POOH and fix them. 16:30 - 17:00 0.50 DRILL LOG PROD1 Change back to 3 1/2" handling tools. 17:00 - 18:00 1.00 DRILL LOG PROD1 POOH with 3 1/2" DP. 18:00 - 21:00 3.00 DRILL LOG PROD1 Down load and reprogram MWD/LWD tools. Unload and reload Nukes. RIH BHA and test MWD tools. OK. 21:00 - 22:00 1.00 DRILL LOG PROD1 RIH w/3 1/2" DP. 22:00 - 00:00 2.00 DRILL PROD1 RIH w/5" DP. Fill every 25 stands. At 8100'. 4/8/2001 00:00 - 02:00 2.00 DRILL PROD1 Trip in hole w/5" DP. Fill every 25 stands. Top of liner 13141'. 02:00 - 03:30 1.50 DRILL PROD1 Wash from 13141' to 13560'. Orient above whipstock. RIH 13560' to 13590'. Wash 13590 to 13815'. 03:30-00:00 20.50 DRILL PROD1 Drill from 13815' to 13930'. (115') ART 1 hr, AST 7.5 hr, TDT 8.5 hrs. PU 290k, SO 220k, TQ on Btm 20k, off btm 17K, Pump off btm 2000 psi, on btm 2150 psi. WOB 25 to 30k. GPM 230.Rotary RPM 10 to 50, Motor rpm 125. Ran a weighted viscus sweep around when on bottom, Circulated 2 lubricant sweeps as needed. (Lubtex, Drill n slide, condet and beads.) 4/9/2001 00:00 - 16:30 16.50 DRILL PROD1 Directionally Drilled by sliding and rotating from 13,930' to 14,195', . (265') ART 7.75 hr, AST 3 hr, TDT 10.75 hrs. P/U weight 275,000#, S/O weight 220,000#, Torque on Btm 17,000 fi/lbs, off btm 14,000 fi/lbs. Rotary RPM 40, Motor RPM 125. Weight on bit 40,000# - 50,000# sliding, 25,000# rotating. Pump rate 250 gpm, SPP 2,400 psi off bottom, 2,500 psi on bottom. Pumped lubricant sweeps as needed. (Lubtex, Drill n slide, condet, beads and walnut hulls in mud.) 16:30 - 18:30 2.00 DRILL PROD1 Circulate bottoms up for short trip. 18:30 - 20:00 1.50 DRILL PROD1 Short trip to 13600'. No drag problems. Return to bottom. Changed out one bent joint of 5" DP during short trip. 20:00 - 00:00 4.00 DRILL PROD1 Directionally Drilled by sliding and rotating from 14,195' to 14,283, (88') ART 2.25 hr, AST 0 hr, TDT 2.25 hrs. P/U weight 275,000#, S/O weight Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page 9 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 4/9/2001 20:00 - 00:00 4.00 DRILL PROD1 215,000#, Torque on Btm 16,000 fi/lbs, off btm 14,000 fi/lbs. Rotary RPM 40, Motor RPM 125. Weight on bit 22,000# rotating. Pump rate 270 gpm, SPP 2,200 psi off bottom, 2,300 psi on bottom. Pumped one weighted viscous sweep just after short trip. This sweep increased the pump pressure by 300 psi and brought back a significant quanity of material. Total drill last 24 hrs slide 3 hrs. rotating 10 hrs. Total 13 hrs. 4/10/2001 00:00 - 06:00 6.00 DRILL PROD1 Directional Drilling from 14283' to 14428' TVD 9982 - Total sliding hours 10 hrs 45 mins - Total rotating hours 15 hrs 42 mins - Total drilling 26 hrs 27 mins. P/U wt 275k - S/O wt 215k - R/wt 245k - TQ on btm 17k - TQ off btm 15k - SPP off btm 2400 - SPP on btm 2600 -GPM 255 - WOB 26 RPM rotary 50 - MTR RPM 85 total 135. 06:00 - 18:00 12.00 DRILL COND PROD1 Circulate and condition mud - rotate and reciprocate string while circulating - Pump 400 bbls new mud in system from Baroid mud plant. 9.9 weight. Mud weight back 9.3 18:00 - 20:00 2.00 DRILL PROD1 PJSM tripping - Pull 14 stands to 13107' hole in good shape no tight spots. 20:00 - 21:00 1.00 DRILL COND PROD1 circulate - mud weight coming back 8.9 out 9.7 in 21:00 - 21:30 0.50 DRILL COND PROD1 Shut down pump - Rig up to take new mud from vac truck to rig pump. :21:30 - 23:30 2.00 DRILL COND PROD1 Pump 370 bbls of new mud from Baroid mud plant add to system while circulating weight in 9.9 and 8.8 to 8.9 out. Pump 3700 stks 370 bbls mud weight back 9.3+ Con't circulating monitoring mud weight. Discard 8.7 - 8.8 mud to vac truck for disposal. 50spm 2000 psi 23:30 - 00:00 0.50 DRILL COND PROD1 Switch to pits mud weight 9.3+ taking returns in pit # 3 and #4. Con't ¢irc monitoring mud weight. 4/11/2001 00:00 - 10:30 10.50 DRILL PROD1 pooh for bit trip. 10:30 - 13:30 3.00 DRILL PROD1 remove source - download MWD 13:30 - 17:30 4.00 DRILL BARR PROD1 Shackle pin dropped in hole - Open BOP door to remove shackle pin - Pin retrieved from BOP's - Close BOP door- Body test 250 Iow 5000 high ok. 17:30 - 18:30 1.00 DRILL PROD1 Clean floor -P/U MWD Tool - L/D Neutron Density Tool 18:30 - 21:30 3.00 DRILL PROD1 M/U BHA - orient and upload MWD - Test MWD. 21:30 - 22:30 1.00 DRILL PROD1 RIH 18 stands of 3.5 dp - Rack 14 stands 3.5 dp on Off Drillers Side. 22:30 - 00:00 1.50 DRILL PROD1 RIH WI5" dp. Filling every 25 stands 4/12/2001 00:00 - 00:30 0.50 DRILL PROD1 TIH with 5" dp filling every 25 stands 00:30 - 01:00 0.50 DRILL PROD1 move 14 stands 3.5" dp from ODS to Drillers side 01:00 - 03:30 2.50 DRILL PROD1 TIH with 5" dp filling every 25 stands to 13085'. 03:30 - 08:00 4.50 DRILL PROD1 Circulate and condition mud - mud weight in 9.5 out 8.9 to 9.1 - pump 6000 stks mud weight back 10.2 to 9.7 - P/U weight 275k S/O weight 220k RT weight 250k Amps 750. 08:00 - 09:00 1.00 DRILL PROD1 Slip and cut drilling line. 09:00 - 15:30 6.50 DRILL PROD1 Con't circulate - add mud lubricant Torque Trim 15:30 - 16:00 0.50 DRILL PROD1 Orient tool face trip in hole 16:00 - 19:30 3.50 DRILL FORM PROD1 RIH to 13623 - pipe stuck -Attempt to circ, packed off- Work stuck pipe - Attempt to break pack off - Circulation 10 spm 1500 psi 19:30 - 21:00 1.50 DRILL FORM PROD1 slowly bring up circulation rate from 10 spm at 1500 psi to 60 spin 1850 psi - good returns. 21:00 - 00:00 3.00 DRILL FORM PROD1 Work - Jar stuck pipe at 13623'. 4/13/2001 00:00 - 06:00 6.00 DRILL FORM PROD1 Circulated and worked stuck pipe. 06:00 - 15:30 9.50 DRILL FORM PROD1 R/U Schlumberger tools. P/U free point tool and ran in the hole to 13,525'. Established Free Point and torque turn. POOH with Schlumberger Free Point tools and LID same. 15:30 - 18:00 2.50 DRILL FORM PROD1 PJMS - P/U and RIH with string shot. W/L stopped at 13,400', base of Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page lO of 14 Operations Summa Report Legal Well Name: 3~25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 'Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Date From -To Hours Task Code Phase Description of Operations 4/13/2001 15:30 - 18:00 2.50 DRILL FORM PROD1 Jars above non-mag Drill Collars. 18:00 - 19:00 1.00 DRILL FORM PROD1 Pumped and Circ 50 bbls of mud. Con't in hole with W/L. to 13525. 19:00 - 21:00 2.00 DRILL FORM PROD1 Apply and work L/H torque correlate tool on depth. Shot dc at 13495. No indication of shot firing. 21:00 - 21:30 0.50 DRILL FORM PROD1 3ooh with wire line. 21:30 - 22:00 0.50 DRILL FORM PROD1 work string with L/H torque - No back off. 22:00 - 00:00 2.00 DRILL FORM :PROD1 make up new shot - torque string to right. Run in hole with shot #2. 4/14/2001 00:00 - 03:00 3.00 DRILL FORM PROD1 RIH with string shot - Work L/H torque in string 03:00 - 04:00 1.00 DRILL FORM PROD1 P/U 300k holding L/H torque in string with rig tongs - con't RIH with wire to correlate shot depth - line will not pass 13320' -circ 25 bbls mud - con't RIH for correlation to fire shot at 13495'. Position tool, fire shot - no indication of toolt firing. 04:00 - 04:30 0.50 DRILL FORM PROD1 work string with L/H torque - no back off 04:30 - 06:00 1.50 DRILL FORM PROD1 POH with wire line - redress string shot 06:00 - 09:30 3.50 DRILL FORM PROD1 RIH with string shot tool - tool stopping at 9934' -circ 20 bbls mud - con't RIH with wire line tools to 13495'. 09:30 - 10:00 0.50 DRILL FORM PROD1 Correlate shot on depth - work 6rds L/H torque in string - pipe backed off - no shot fired. 10:00 - 13:00 3.00 DRILL FORM PROD1 POH with string shot - R/D Schlumberger tools 13:00 - 16:30 3.50 DRILL FORM PROD1 Circulate and Condition mud 16:30 - 19:00 2.50 DRILL FORM PROD1 POOH with string. 19:00 - 19:30 0.50 DRILL FORM PROD1 Pump pill - blow down top drive 19:30 - 00:00 4.50 DRILL FORM PROD1 POOH with string 4/15/2001 00:00 - 00:30 0.50 DRILL :FORM PROD1 LID 2 Non Mag DC's and Jars. Pin on backed out DC in excellent shape. 00:30 - 02:00 1.50 DRILL FORM PROD1 P/U Fishing Assy. 4 3/4" screw in sub, bumper sub, oil jar, 9 - 4 3/4" DC's, acc jar, 3jt's 3 1/2" hwdp, XO 4 1/2" boxx 3 1/2" pin. Total Length of Fishing Assy - 408.30' Drifted 4 3/4" DC's 02:00 - 07:00 5.00 DRILL FORM PROD1 RIH with Fishing assy on 5" Drill Pipe. Checked torque on all connections and tightened as required. 07:00 - 08:00 1.00 DRILL FORM PROD1 P/U, Drifted and M/U 10 jts of 5" Drill Pipe. Fishing Assembly 18' above Fish. 08:00 - 08:30 0.50 DRILL FORM PROD1 Circulated above fish to clean hole and connection of Fish. Pump Rate 250 gpm, SPP 1,150 psi. 08:30 - 09:00 0.50 DRILL FORM PROD1 RIH and engaged Fish. Rotary 10 RPM, Pump Rate 60 gpm SPP 500 psi. Fish engaged SPP increased to 1,000 psi. Shut down pumps and torqued up screw in sub into Fish. 09:00 - 10:00 1.00 DRILL FORM PROD1 Attempted to Circulate hole. Rocked and Reciprocated Pipe. Cycled pumps up to 20 spm, SPP 1,600 psi. No success at circulation. 10:00 - 11:00 1.00 DRILL FORM PROD1 Jarred on Fish at 50,000#, 70,000#, 80,000#, 100,000# over string weight. No movement. 11:00 - 11:30 0.50 DRILL FORM PROD1 Attempted to Circulate hole. Rocked and Recprocated Pipe. Cycled pumps up to 25 spm, SPP 1,800 psi. No success at circulation. 11:30 - 12:00 0.50 DRILL FORM PROD1 Jarred on Fish at 100,000# and 110,000# over string weight. No movement. 12:00 - 12:30 0.50 DRILL FORM PROD1 Attempted to Circulate hole. Rocked and Reciprocated Pipe. Cycled pumps from 20 to 30 spm, SPP 2,000 psi. No success at circulation. 12:30 - 13:30 1.00 DRILL FORM PROD1 Jarred on Fish at 110,000# and 120,000# over string weight. No movement. 13:30 - 14:00 0.50 DRILL FORM PROD1 Bumped down on Fish with 120,000#. No movement. 14:00 - 14:30 0.50 DRILL FORM PROD1 Jarred on Fish at 120,000# over string weight. No movement. Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page,11 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 4/15/2001 14:30 - 16:30 2.00 DRILL FORM PROD1 Attempted to Circulate hole. Rocked and Reciprocated Pipe. Cycled pumps from 8 to 15 spin, Moved 7 bbls, Slight flow, SPP reached 2,000 psi. Stopped Pump and bled off pressure. Continued to Cycle pumps from 8 to 15 spin, Average 4 bbls moved. Allowed SPP to reach 2,000 psi. Bled off pressure and cycled pumps. Total mud moved 40 bbls. 16:30 - 17:00 0.50 DRILL FORM PROD1 Worked 5 Right Hand turns of torque into string. Jarred on Fish at 120,000# over string weight. No movement. 17:00 - 18:30 1.50 DRILL FORM PROD1 Attempt to circ hole - 8 spm holding constant at 500 psi slight flow - con't holding 8 spm letting psi raise to 2000 with slight flow, at 2000 psi stop pump bleed off pressure to 500 psi - torque string - bleed off psi reciprocate string from 330k to 220k - Same sequence next four times - taking less stks to achieve 2000 psi - 5th time flow was stronger after reaching 2000 psi - holding 10 spm let pump pressure increase to 2750 flow rate increased pressure broke over pressure started down. Stks coming up and pressurei going down - stablized at 18 spm and 1500 psi 8% flow. 18:30 - 22:00 3.50 DRILL FORM PROD1 CBU - initial spin 18 at 1500 - increasing spin by 5 stks every 15 mins as pressure and flow stablized - work rate to 70 spm at 2500 psi. 22:00 - 00:00 2.00 DRILL FORM PROD1 Jar on pipe from 110k over - jars firing at 400k - bump down on fish 110k no movement - torque string, jar up 11 Ok over string wt - work pipe to 530k up and 220k down - bump down on string holding torque in string - no movement. 4/16/2001 00:00 - 03:00 3.00 DRILL FORM PROD1 Jar up110k over - Bump down with torque in pipe 100k - no movement 03:00 - 04:00 1.00. DRILL FORM PROD1 Torque string - slump pipe with 100k down 04:00 - 06:00 2.00~ DRILL FORM PROD1 Torque string - jar pipe - bump down on pipe - work string 06:00 - 06:30 0.50 DRILL FORM PROD1 Pumped 17 bbls of Sack Fishing Tools down.the Drill String and spotted 2 bbls around fish. Put R.H. Torque into the Drill string, 20,000 fi/lbs and set down 90,000# on string. 06:30 - 12:30 6.00 DRILL FORM PROD1 Soaked Fish with Sack Fishing Tools. Moved 1/4 bbl every 1/2 hour. 12:30 - 13:00 0.50 DRILL FORM PROD1 Jarred on Fish at 100,000# and 110,000# over string weight. No movement. Bumped down on Fish with 70,000#, No movement. Moved 1 bbl of SFT. Put 20,000 fi/lbs of R.H. torque into Drill String and set down on string with 90,000#. 13:00 - 14:30 1.50 DRILL FORM PROD1 Soaked Fish with Sack Fishing Tools. Moved 1/2 bbl every 1/2 hour. 14:30 - 15:00 0.50 DRILL FORM PROD1 Jarred on Fish at 100,000# and 110,000# over string weight. No movement. Bumped down on Fish with 70,000#, No movement. Moved 1 bbl of SFT. Put 20,000 ft/Ibs of R.H. torque into Drill String and set down on string with 90,000#. 15:00 - 16:30 1.50 DRILL FORM :PROD1 Soaked Fish with Sack Fishing Tools. Moved 1/2 bbl every 1/2 hour. 16:30 - 17:00 0.50 DRILL FORM PROD1 Jarred on Fish at 100,000# and 110,000# over string weight. No movement. Bumped down on Fish with 70,000#, No movement. Moved 1 bbl of SFT. Put 20,000 fi/lbs of R.H. torque into Drill String and set down on string with 90,000#. 17:00 - 21:00 4.00 DRILL PROD1 Soaked fish with sack fishing tools. Move 1 bbl every hour. 21:00-21:30 0.50 DRILL PROD1 Jaron fish 100Kto 110k over string weight. No movement. Bump down on fish 70k no movement. Move 1 bbl SFT. Torque string with R/H torque 20K ft/Ibs. Slump pipe to 160k down. 21:30 - 23:30 2.00 DRILL PROD1 SOak fish with SFT. Move 1 bbl every hour. 23:30 - 00:00 0.50 DRILL PROD1 Jar up 100k to 110k over string wt. Bump down 70K no movement. 4/17/2001 00:00 - 16:30 16.50 DRILL !FORM PROD1 work pipe from 150k to 540k - move SFT 1 bbl per hour - pipe movement 4" upward. Work pipe from 140k to 510k - moving SFT 1 bbl per hour - pipe movement 4" upward 2" to 3" down. Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page 12 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25NN-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 4/17/2001 00:00 - 16:30 16.50 DRILL FORM PROD1 Work pipe from 140k to 540k - establish cite 55 spm 2500 psi - con't work string ~ jar on string 120k over string weight. No movement seen work torque - torque and slump - work string 550k to 140k no movement. 16:30 - 18:00 1.50 DRILL FORM PROD1 R/U Schlumberger tools to run string shot - make up string shot. 18:00 - 00:00 6.00 DRILL FORM PROD1 RIH with string shot - tool stopped at 13350' - cite 10 bbls mud con't rih with tool - correlate tool on depth - Work L/H torque in string 11 rds - correlate shot on depth - fire shot - indication of shot firing - pull wire line up hole 200 feet - p/u weight on string 280k, pipe backed off. 4/18/2001 00:00 - 02:30 2.50 DRILL FORM PROD1 POH with wire line - RID Schlumberger tools - LID same 02:30 - 05:30 3.00 DRILL FORM PROD1 CBU two bottoms up - break topdrive back flowing bad - mud out of balance - con't cire to get mud balanced to trip out to TOL - Circulation rates 11 bbl per min at 1800 psi. 90 to 85% barite 5 to 10% sand back on bottoms up. Same on 2nd circ. 05:30 - 06:00 0.50 DRILL FORM PROD1 POH to TOL. 06:00 - 10:00 4.00 DRILL FORM PROD1 Circulate - Slip new drilling line on 10:00 - 18:00 8.00 DRILL FORM PROD1 POH - L/D 4 3/4" dcs- fishing tools - left screw in sub in hole - (tested choke manifold on trip out of hole - 250 Iow 5000 high). 18:00 - 00:00 6.00 DRILL PROD1 R/U to test BOP's - test bop's - recorder not working change out - test lower rams 3.5 X 6 variable 250, 5000 ok - test annular 250 Iow 2500 against 3.5 dp - would not hold 2500 - recycle annular - retest to 2500 ok - LID 3.5 test joint, P/U 5" test joint - Test upper ram 4.5 X 7 variable 250 - 5000 ok 4/19/2001 00:00 - 05:00 5.00 DRILL PROD1 test upper rams 4.5 x 7" with 5"dp, manifold valves 16, 17, 18 250 Iow 5k high ok - test upper rams, manifold valves 12, 13, 14, 15, 250 Iow 5k high ok - test upper rams, hcr choke, kill her 250 Iow, 5k high ok - test upper rams, manual valve choke, manual valve kill, 250 Iow, 5k high ok - test lower rams 3.5 x 6" with 5"dp 250 Iow, 5k high ok - test annular with 5" dp 250 Iow, 2500 high ok - test top drive IBOP valve, manual IBOP 250 Iow, 5k high ok - test floor valves TIW, Dart valve 250 Iow, 5k high ok - pull test plug - install wear ring. 05:00 - 12:30 7.50 TA ABAN Make up clean out assy - RIH with assy to 11000 feet. 12:30 - 23:30 11.00 TA ABAN Break circ- wash from 11000' to 13491' top of fish - lots of Barite, iWalnut, Fiber coming out of hole. Some sand cuttings was seen at 12500' bottoms up nothing else seen as far cuttings - pumping sweeps while washing, (hi vis, Icm sweeps) one hi vis weighted sweep pumped at 12000' 23:30 - 00:00 0.50 TA ABAN CBU - 120 spm 12 bbls per min - reciprocate / rotate string 90' while circ 4/20/2001 00:00 - 07:30 7.50 TA ABAN con't circ wash reciprocate and rotate 12bbls per min 2000 psi 07:30 - 08:30 1.00 TA ABAN 3oh 3 stands plus double 08:30 - 11:30 3.00 TA ABAN Run injectivity test - 2000 psi 77 stks held for 10 mins 1950 - 11:30 - 14:30 3.00 TA ABAN PJSM - Displace well to 9.4 brine 14:30 - 16:30 2.00 TA ABAN Monitor well- clean surface equipment - build vol. 16:30 - 19:00 2.50 TA ABAN Circ / condition brine circ till clean returns and weight leveled out 19:00 - 20:30 1.50 TA ABAN PJSM - Pull 4 stands - Flow check well for 30 mins ok - RIH tag top fish no fill 20:30 - 00:00 3.50 TA ABAN POH 4/21/2001 03:00 - 04:00 1.00 TA ABAN Safety Meeting (tripping new crew) Con't poh - L/D 8.5" stablizer - 6.5" jars - break bit, float sub, bit sub, LID same 04:00 - 06:30 2.50 TA ABAN PJSM wire line safety - Rig up Schlumberger tools - Make up Baker retainer to Schlumberger wire line - RIH with retainer (start in hole with Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page 13 of 14 Operations Summary Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25NN-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: RIG Rig Name: DOYON 15 Rig Number: Sub Phase Description of Operations Date From-To Hours Task Code 4/21/2001 04:00 - 06:30 2.50 TA ABAN retainer at 04:30). 06:30 - 08:30 2.00 TA ABAN Correlate retainer on depth - set on depth - fire shot set retainer - Wire line depth 13498' - Dp depth 13488' - POH with wire line tools - Rig down Schlumberger 08:30 - 10:00 1.50 TA ABAN RIH with 6 joints 3.5 heavi-weight dp - L/D same - RIH 3.5 dp to 3058' 10:00 - 10:30 0.50 TA ABAN Circ two capacity of 3.5 Dp - blow down top drive 10:30 - 13:00 2.50 TA ABAN Lay down 3058 feet of 3.Sdp 13:00 - 14:00 1.00 TA ABAN PJSM test casing to 2500 held for 30 rains ok. 14:00 - 17:00 3.00 TA ABAN iChange out 5" elevators - RIH with 5" dp to 5803' 17:00 - 20:00 3.00 TA ABAN 'Lay down 5" dp to 1500' 20:00 - 22:00 2.00 TA ABAN PJSM - rig up HB&R test line - Freeze protect well to 1500 feet. 22:00 - 23:00 1.00 'IA ABAN Lay down remaining 5"dp 1500' 23:00 - 23:30 0.50 TA ABAN Pull wear ring - Freeze protect 9 5/8" casing void 23:30 - 00:00 0.50 TA ABAN Change elevators to 4.5" - Pick up two joints of 4.5 NSCT - tubing hanger install TWC and landing joint ,4/22/2001 00:00 - 00:30 0.50 TA ABAN Back out lock down screws - RIH land tubing hanger 00:30 - 02:30 2.00 TA ABAN Screw in locking screws - test TWC to 500 psi for 5 mins ok - LID landing joint 02:30 - 12:00 9.50 TA ABAN Nippling down BOP's - clean drip pan - surface equipment from settled out barite - open doors on BOP's flush, wash out settled out barite - Install dry hole tree - test to 3500psi ok 12:00 - 17:00 5.00 RIGD ABAN PJSM - rig down - prepare rig to move 17:00 - 18:00 1.00 RIGD ABAN Skid floor back - Rig released at 18:00 hrs. Printed: 5/1/2001 10:11:08 AM BP EXPLORATION Page 14 of 14 Operations Sumrna Report Legal Well Name: 3-25/M-27 Common Well Name: 3-25A/N-24 Spud Date: 1/6/1991 Event Name: REENTER+COMPLETE Start: 3/17/2001 End: 3/22/2001 Contractor Name: DOYON Rig Release: 4/22/2001 Group: Rig Name: DOYON 15 Rig Number: Date From-To Hours Task Sub Code Phase Description of Operations 3/16/2001 00:00 - 00:00 24.00 MOB PRE PJSM - picking up 5" DP - Prepare for Rig Move, Waiting on Production to prepare 3-25A wellbore. P/U 5" DP and stand back in Mast. 3/17/2001 00:00 - 13:00 13.00 MOB PRE Prepared for rig move, Waited on Production to ready 3-25A, P/U 5" DP while waiting. Changed liners to 6" in Pump # 1 and # 2. 13:00 - 19:00 6.00 MOB PRE PJSM - moving rig - Slid rig floor back for rig move - moved pump / pit module from 2-28A. Moved sub module from well 2/28A 19:00 - 22:00 3.00 MOB PRE PJSM - Handling BOP's - Removed 7 1/16" BOP from stump, P/U 4 1/16" tree and secured on stump for move 22:00 - 00:00 2.00 MOB PRE PJSM - Moving rig - Moved rig from MPI to SDI. 3/18/2001 00:00 - 16:00 16.00 MOB PRE Waited on Production to move onto well 3/25A. Blade Pad for rig move. 16:00 - 19:00 3.00 MOB PRE PJSM - set mats - Laid herculite and rig mats. 19:00 - 00:00 5.00 MOB PRE PJSM - moving rig - Move sub module over well 3/25A, moving pit module in place. 3/25/2001 03:30 - 04:00 0.50 PULL DECOMP break cir¢, p/u 350K, s/o 225K, take SPR for pumps. 4/21/2001 00:00 - 03:00 3.00 TA ABAN Con't POH to run wire line retainer. . Printed: 5/1/2001 10:11:08 AM 07-May-01 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well 3-25APB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 13,556.89' MD Window / Kickoff Survey: 13,571.00' MD Projected Survey: 14,428.00' MD (if applicable Please call me at 273-3545 if you have anY questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) R. (,,EIVED HAY 1 8 2001 ~asKa. u, & r,~as Cons. Comm~ Artchorage DEFiNiTiVE Alaska State Plane 3 Alaska Drilling & Wells Endicott DI-SDI, Slot 3-25/M-27 3-25/M-27- 3-25APB1 Job No. AKZZIO~3, Surveyed: 10 April, 200~ $ UR VEY REPORT 7 May, 2001 Your Reft APl 500292212570 Surface Coordinates: 5970978.01 N, 270283.14 E (70° 19' 20.4002"N, 147° 51'45.8097" VI/) Kelly Bushing: 55. lOft above Mean Sea Level O RtL L ! !~11~ S[E RVI {:: E 5 · Survey Reft svy978 A Halliburton Company Sperry-Sun Drilling Services Survey Report for 3-25/M-27 - 3-25APB1 Your Reft APl 500292212570 Job No. AKZZ10113, Surveyed: 10 April, 2001 Alaska State Plane 3 Measured Depth (ft) Incl. 13556.89 40.680 0.680 Sub-Sea Depth (ft) 9870.22 Vertical Depth (ft) 9925.32 13571.00 40.180 0.010 9880.96 9936.06 13589.70 42.020 359.130 9895.05 9950.15 13623.69 49.330 357.820 9918.78 9973.88 13656.01 56.400 356.750 9938.28 9993.38 13684.59 62.250 355.910 9952.85 10007.95 13722.88 72.170 354.470 9967.67 10022.77 13737.49 75.570 354.160 9971.73 10026.83 13772.79 85.870 353.180 9977.41 10032.51 13797.53 91.540 354.010 9977.97 10033.07 13835.15 94.870 350.320 9975.87 10030.97 13865.15 95.480 346.520 9973.16 10028.26 13889.01 96.720 342.520 9970.62 10025.72 13930.45 96.480 342.670 9965.86 10020.96 13964.90 96.600 341.470 9961.94 10017.04 13989.70 96.850 339.710 9959.03 10014.13 14023.55 95.110 336.300 9955.51 10010.61 14056.99 94.370 333.540 9952.74 10007.84 14086.20 94.070 333.930 9950.59 10005.69 14121.64 93.630 333.000 9948.21 10003.31 14152.19 93.450 332.750 9946.33 10001.43 14183.03 93.200 331.910 9944.54 9999.64 14216.63 93.200 331.920 9942.66 9997.76 14278.74 93.940 330.980 9938.79 9993.89 14328.91 94.180 330.940 9935.24 9990.34 14428.00 94.180 330.940 9928.02 9983.12 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (rt) (ft) 7844.32 N 2975.15W 5978909.72 N 267549.49 E 7853.47 N 2975.10W 5978918.87 N 267549.82 E 7865.77 N 2975.19W 5978931.16 N 267550.10 E 7890.06 N 2975.85W 5978955.46 N 267550.18 E 7915.78 N 2977.09W 5978981.20 N 267549.74 E 7940.29 N 2978.66W 5979005.76 N 267548.91 E 7975.42 N 2981.64W 5979040.96 N 267547.02 E 7989.39 N 2983.03W 5979054.96 N 267546.06 E 8023.97 N 2986.87W 5979089.64 N 267543.28 E 8048.54 N 2989.62W 5979114.28 N 267541.27 E 8085.73 N 2994.74W 5979151.62 N 267537.29 E 8115.00 N 3000.74W 5979181.05 N 267532.20 E 8137.86 N 3007.07W 5979204.10 N 267526.57 E 8177.14 N~ 3019.38W 5979243.74 N 267515.46 E 8209.70 N 3029.92W 5979276.61N 267505.93 E 8232.93 N 3038.10W 5979300.07 N 267498.46E 8264.14 N 3050.71W 5979331.65 N 267486.81 E 8294.32 N 3064.83W 5979362.25 N 267473.62 E 8320.44N 3077.73W 5979388.76 N 267461.53 E 8352.08 N 3093.52W 5979420.86 N 267446.71 E 8379.22 N 3107.42W 5979448.41N 267433.65 E 8406.48 N 3121.72W 5979476.10 N 267420.19 E 8436.08 N 3137.51W 5979506.17 N 267405.31E 8490.53 N 3167.14W 5979561.50 N 267377.37 E 8534.28 N 3191.43W 5979605.98 N 267354.42 E 8620.67 N 3239.44W 5979693.79 N 267309.09 E Dogleg Rate (°/100ft) 4.694 10.314 21.681 22.033 20.624 26.138 23.361 29.306 23.162 13.200 12.778 17.461 0.682 3.478 7.120 11.260 8.518 1.682 2.898 1.007 2.837 0.030 1.924 0.485 0.000 Alaska Drilling & Wells Endicott DI-SDI Vertical Section Comment 7650.52 7656.96 7665.71 7683.36 7702.42 7720.87 7747.81 7758.67 7785.83 7805.16 7835.08 7860.01 7880.65 7917.13 7947.61 7969.82 8000.81 8032.13 8059.72 8093.26 8122.28 8151.67 8183.77 8243.22 8291.33 8386.36 Tie On Point AK-6 BP IFR-AK -- Window Point Projected Survey 7 May, 2001 - 11:35 Page 2 of 3 DriilQuest 2.00.0&005 Sperry-Sun Drilling Services Survey Report for 3-25/M-27 - 3-25APB1 Your Ref: AP1500292212570 Job No. AKZZIOll3, Surveyed: l0 April, 200~ Alaska State Plane 3 Alaska Drilling & Wells Endicott DI-SDI All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.189° (23-Mar-01) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well Reference and calculated along an Azimuth of 315.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14428.00ft., The Bottom Hole Displacement is 9209.23ft., in the Direction of 339.405° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 13556.89 9925.32 7844.32 N 2975.15W 13571.00 9936.06 7853.47 N 2975.10W 14428.00 9983.12 8620.67 N 3239.44W Comment Tie On Point Window Point Projected Survey Survey tool program for 3-25/M-27 - 3-25APB1 From To Measured Vertical Measured Vertical Depth Depth Depth Depth (rt) (ft) (ft) (ft) 0.00 0.00 13556.89 9925.32 13556.89 9925.32 14428.00 9983.12 Survey Tool Description AK-1 BP_HG - BP High Accuracy Gyro (3-25/M-27) AK-6 BP_IFR-AK (3-25APB1) 7 May, 2001 - 11:35 Page 3 of 3 DrillQuest 2.00.08.005 DEFiNITiVE _ Alaska State Plane 3 Alaska Drilling & Wells Endicott DI-SDI, Slot 3-25/M-27 3-25/M-27- 3-25APB1 MWD Job No. AKMMlO097, Surveyed: 10 April, 2001 SURVEY REPORT 7 May, 2001 Your Ref: AP1500292212501 Surface Coordinates: 5970978.01 N, 270283.14 E (70° 19'20.4002"N, 147° 51'45.8097"VV) Kelly Bushing: 55.10ft above Mean Sea Level 13RILLINB S. ERVICE~ Survey Ref: svy977 A Halliburton Company Sperry-Sun Drilling Services Survey Report for 3-25/M-27 - 3-25APB1 MWD Your Reft AP! 5002922'!2501 Job No. AKMM'IO097, Surveyed: 'lO April, 200'1 Alaska State Plane 3 Measured Depth (ft) Incl. 13556,89 40.680 0.680 Sub-Sea Depth (ft) 9870.22 Vertical Depth (ft) 9925.32 13571.00 40,180 0,010 9880.96 9936.06 13589.70 42.020 359.130 9895.05 9950.15 13623.69 49,330 357.820 9918.78 9973.88 13656.01 56.400 356.750 9938.28 9993.38 13684.59 62.250 356.700 9952.85 10007.95 13722.88 72.170 355,300 9967.67 10022.77 13737.49 75.570 355,020 9971.73 10026.83 13772.79 85,870 353.220 9977.41 10032.51 13797.53 91.540 353,790 9977.97 10033.07 13835.15 94.870 350.590 9975.87 10030.97 13865.15 95,480 346.820 9973.16 10028.26 13889.01 96.720 342.630 9970.62 10025.72 13930.45 96,480 341.530 9965.86 10020.96 13964.90 96,600 340.860 9961.94 10017.04 13989.70 96,850 338.520 9959.03 10014.13 14023.55 95,110 336.200 9955.51 10010.61 14056.99 94,370 333,410 9952.74 10007.84 14086.20 94,070 333.830 9950.59 10005.69 14121.64 93,630 332,920 9948.21 10003.31 14152.19 93,450 332.750 9946.33 10001.43 14183.03 93,200 332.130 9944.54 9999.64 14216.63 93.200 332.040 9942.66 9997.76 14278.74 93,940 331,220 9938.79 9993.89 14328.91 94.180 331.000 9935.24 9990.34 14428.00 94.180 331,000 9928.02 9983.12 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 7844.32 N 2975.15W 5978909.72 N 267549.49 E 7853.47 N 2975.10W 5978918.87 N 267549.82 E 7865.77 N 2975.19W 5978931.16 N 267550.10 E 7890.06 N 2975.85W 5978955.46 N 267550.18 E 7915.78 N 2977.09W 5978981.20 N 267549.74 E 7940.31 N 2978.49W 5979005.76 N 267549.09 E 7975.47 N 2980.96W 5979040.99 N 267547.69 E 7989.46 N 2982.15W 5979055.00 N 267546.93 E 8024.06 N 2985.72W 5979089.70 N 267544.42 E 8048.63 N 2988.52W 5979114.34 N 267542.38 E 8085.83 N 2993.62W 5979151.68 N 267538.42 E 8115.12 N 2999.47W 5979181.14 N 267533.47 E 8138.01N 3005.72W 5979204.20 N 267527.92 E 8177.17 N 3018.38W 5979243.74 N 267516.46 E 8209.57 N 3029.41W 5979276.46 N 267506.43 E 8232.67 N 3037.96W 5979299.81 N 267498.59 E 8263.74 N 3050.92W 5979331.26 N 267486.59 E 8293.89 N 3065.11W 5979361.83 N 267473.33 E 8319.98 N 3078.05W 5979388.31-N 267461.19 E 8351.59 N 3093.90W 5979420.39 N 267446.32 E 8378.72 N 3107.82W 5979447.93 N 267433.24 E 8406.02 N 3122.06W 5979475.65 N 267419.84 E 8435.66 N 3137.77W 5979505.76 N 267405.04 E 8490.21N 3167.22W 5979561.18 N 267377.27 E 8534.02 N 3191.40W 5979605.72 N 267354.45 E 8620.46 N 3239.31W 5979693.58 N 267309.20 E Dogleg Rate (°/100ft) 4.694 10.314 21,681 22.033 20,469 26.125 23.344 29,608 23,034 12.266 12.679 18.218 2.700 1.963 9.425 8.537 8.6O4 1.764 2.847 0.810 2,165 0.267 1.776 O.648 0.000 Alaska Drilling & Wells Endicott DI-SDI Vertical Section Comment 7650.52 7656.96 7665.71 7683.36 7702.42 7720.75 7747.37 7758.10 7785.09 7804.44 7834.35 7859.20 7879.80 7916.45 7947.16 7969.54 8000.67 8032.02 8059.63 8093.18 8122.21 8151.58 8183.65 8243.05 8291.13 8386.12 Tie On Point MWD Magnetic Window Point Projected Survey 7 May, 2001 - ~:36 Page 2 of 3 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for 3-25/M-27 - 3-25APB1 MWD Your Ref: APl 500292212501 Job No. AKMMlO097, Surveyed: t0 April, 2001 Alaska State Plane 3 Alaska Drilling & Wells Endicott DI-SDI All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.189° (23-Mar-01) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well Reference and calculated along an Azimuth of 315.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14428.00ft., The Bottom Hole Displacement is 9208.99ft., in the Direction of 339.405° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings (fi) (ft) (ft) (ft) Comment 13556.89 9925.32 7844.32 N 2975.15 W Tie On Point 13571.00 9936.06 7853.47 N 2975.10 W Window Point 14428.00 9983.12 8620.46 N 3239.31 W Projected Survey Survey tool program for 3-25/M-27 - 3-25APB1 MWD From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) Survey Tool Description 0.00 0.00 13556.89 9925.32 13556.89 9925.32 14428.00 9983.12 AK-1 BP_HG - BP High Accuracy Gyro (3-25/M-27) MWD Magnetic (3-25APB1 MWD) 7 May, 2001 - ~:36 Page 3 of 3 DriilQuest 2.00.08.005 '~.. STATE OF ALASKA ~', ALASK ,.)IL AND GAS CONSERVATION COM ,oSION APPLIOATION FOR ,SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Pedorate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska) Inc. :3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2519' SNL, 759' WEL, SEC. 08, T11N, R17E, UM At top of productive interval 72' SNL, 1564' EWL, SEC. 05, T11N, R17E, UM At effective depth At total depth 1259' NSL, 182' EWL, SEC. 32, T12N, R17E, (Planned) 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE: 55.10' 7. Unit or Property Name Duck Island Unit/Endicott 8. Well Number 3-25NN-24 9. Permit Number 201-020 10. APl Number 50- 029-22125-01 11. Field and Pool Endicott Field / Endicott Pool 12. Present well condition summary Total depth: measured 14429 feet true vertical 9984 feet Effective depth: measured 13587 feet true vertical 9950 feet Casing Length Structural Conductor 92' Surface 2409' Intermediate Production 13345' Liner 1009' Size 30" 13-3/8" 9-5/8" 7" Plugs (measured) Junk (measured) Cemented Driven 2629 cu. ft. Permafrost Set CIBP and Whipstock at 13587' MD Lost 6" BHA/Drilling Assy. Top at 13494' MD 131' 2448' 3448 cu. ft. Class 'G' 13384' 454 cu. ft. Class 'G' (Top of Window) 13141' - 13571' TVD 131' 2383' 9805' 9619' - 9936' Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None Alaska Oil & Gas Cons. Cc;'nmissi,'.',n Anchora¢!e 13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch 14. Estimated date for commencing operation April 18, 2001 16. If proposal was verbally approve~l<~ ~ ~ Tom Maunder ~r-J." ~,?,:~.b\..~ 4/18/2001 Name of approver Date Approved Contact Engineer Name/Number: Jeff Hupp, 564-5344 I15. Status of well classifications as: []Oil [] Gas [] Suspended Service Prepared By Name/Number'. Sondra Stewman, 564-4750 17. I hereby certify that the for~.~ is true and correct to the best of my knowledge ,~.,//, _ /,, Signed jeff Hupp c~, ~..,~~,~/~ ~ 7..,,~~ Title Senior Drilling Eng hoer Date y//~'~, ~/ ~...~ ::':."': .' .:.".::...':,., :..'... ~ .'. ::',': ~: '..;.'.:..~ :':..' :.:~..:,... ,..".: .:::". ~,/~' ~':.'.:'.. :'.:':..' :.'. :.',:.':..::,Co~,',',~,'.,u,, o~i~,:.',.:.t:..:..".'..".~ :'.:",. '. :::,'.:?...'.: :.'.":.". ::":".':':..'~.:'.:~','."::. :?:::.~ ~. ~..: "~:?.:::,:': ~:~'::.:i..~: :.'~.. .~:.. :::,: Conditions of Approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance __ Mechanical Integrity Test ~ Subsequent form required 10- I~.(') % ~'IGINAL SIGNED BY Approved by order of the Commission D Taylor Seamount Form 10-403 Rev. 06/15/88 ORIGII4AL IAppr°val N°' Commissioner Date Submit In Triplicate mm, mmmmmmmmmm mm To: Tom Maunder AOGCC Petroleum Engineer From: Jeff Hupp Subject: 3-25AN-24 Open Hole Plug and Abandonment Date: April 18, 2001 Background The following operation is proposed to plug and abandon the exiting 3-25NN-24 6" open hole interval. After drilling to 14429' MD, a trip was made to change the bit. While RIH through the existing 7" exit window (13571- 83' MD), the drilling BHA got stuck at 13623' MD. After unsuccessfully attempting to jar the BHA free, the proposed forward operation is as follows: Procedure. 1. POH. LD fishing assembly and 6" BHA. 2. MU 6" mill tooth bit, 7" casing scraper, 400' of 3-1/2" drill pipe, XO, 9-5/8" casing scraper, I stand 5" drill pipe, drilling jars and 5" drill pipe to surface. 3. Stage in hole to 11000' MD, circulating at maximum rate. Work pipe up and down while circulating. a. Pump weighted Bara fiber sweeps to ensure hole is clean. 4. After reaching the 7" liner top with the 6" bit, circulate btms up prior to going into the 7" liner. 5. Wash entire length of the 7" liner to the top of the fish @ 13494' MD. 6. CBU. Ensure wellbore is clean. 7. Close 5" pipe rams and establish injection rate. 8. After injectivity test, displace well to 9.4 ppg brine. 9. POH and LD clean out assembly. If unable to establish injection rate in step #8, go to step #15. 10. If able to establish injection, MU cement retainer on drill pipe. 11. RIH with retainer. Tag top of fish at 13494' MD, PU 4 ft and set retainer at 13490' MD. 12. Establish injection rate. Sqz 25 bbls of 15.8 ppg cement below retainer. (open hole volume: 30 bbls) 13. Unsting from the retainer and test casing to 2000 psi. 14. POH with drill pipe. Go to step #19. 15. RU e-line unit. 16. MU 7" CIBP on e-line setting tool. RIH and set CIBP at 13490' MD (4 ft above the top of the fish). 17. POH and rig down e-line. 18. Pressure test casing to 2000 psi for minutes. 19. Based on BP and co-owner approval, a second sidetrack is an option. This directional plan would be included with the Sundry notice. 20. If the well is suspended, the following operations would be completed: a. The top 1500' of the well would befreeze protected with diesel b. Run 2 jts of 4-1/2" L80 and the Cameron tbg hanger. RUN in LDS. Test void area. c. Set TWC. Test to 500 psi through tbg spool. d. ND BOPE. NU DH tree. Test tree to 3500 psi e. Remove TWC and install BPV. f. Move rig to the Endicott 3-15/K-33 Rig workover. g. The 3-25A/N-24 would be included on the Endicott drilling schedule after 11/1/01. Senior Drilling-engineer Stewman, Sondra D From: Sent: To: Cc: Subject: Hupp, Jeffrey L Wednesday, April 18, 2001 4:57 PM Hubble, Terrie L; NSU, ADW Drlg Rig 15 Stewman, Sondra D FW: Suspension procedure Card for Tom Maunder See below for AOGCC approval. Jeff Hupp MB 447 Phone: (907) 564-5344 Cell: (907) 24o-8o57 Fax: (907) 564-5441 e-mail: huppjl@bp.com ..... Original Message ..... From: Tom Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Wednesday, April 18, 2OOl 3:36 PM To: Hupp, Jeffrey L Subject: Re: Suspension procedure Jeff, As discussed, this procedure is unfortunately acceptable. Hope you chase those woolly guys away or at least plant them in cement. Tom Maunder "Hupp, Jeffrey L" wrote: > < <3-25A N-24 AOGCC P&A notification.doc> > > Tom, > I wi]] fax the we]] bore schematic. > Jeff Hupp Name: 3-25A N-24 AOGCC P&A notification.doc 3-25A N-24 AOGCC P&A notification.doc Type: WINWORD File (application/msword) Encoding: base64 TREE: 4-1/16" /5000 psi /McEv~ Baker Actuator /' R.T. ELEV :55.1' WELLHEAD: 13-5/8" /5000 psiJl~ .voy)[ B.F. ELEV = 15.28' · , MAX. DEV. = 55:10 , ~Diesel to 1500t, ~ ~ 2 jts 4-1/2" L80 tbg L ' 13-~/8", 68#/ft, NT80 CYHE BUTT CSG .... :~ ':: ..... ',"..' -'.:. ,".... '".i ~1~ ":"' "*' ':' "'"' "'"""':5"":'"~':'"'?"'"" ' :''; ' I I :' ·. ~..".' 4-~'.': .... '" . :..". · ' ''..i.'.':'.:'' · :i.'-'.'.'.'.:.' .".7.-' ': ,' ;' "':,~:~ : :,~ .~.'i'.:~, .:i. :~i: "? .i::.':~::.~:.:'::.::..";.::."~,.!i¢':..:.;,...::... Drilled 6" hole to ~442~' MD. Ma0e bit trip. j. ~,.., ~ ..~ .....,.-.:,~.,: .:... 9-5/8" 47#/ft 'i:igii~ii~!::i~;i'~.i: While RIH just below the window, , the drlg BHA stuck and packed off. NT8OS XOto NTO5HS ::.". ..' ,Attempted unsuccessfully to free the BHA I I ..... '"'"'"'"': :' ""'"' '" · with a jarring assy. I I 396' '. ....:.'~....: ..~:' ..- . : , , :...~'. ":..'...,'.'~,:.:'; '":? ",' Plan to set a cmt retainer and sqz cement I-"'. :- .·,,,·.,,;~'.~:;.' .:, ~:." .'. · '.!,...i,!~. ~,,i.i"i,":~!.':."':.:?"i..,' i'''~' around the BNA to suspend the well. i:~:."..'.¥i:/"-.ii.?:.~:.':,:....:. ., A CIBP will be set if an injection rate :,:...:~?.:..:::.:.:'.'..i:~.: :'..,~.: .... can not be established, · . . .. · . ... · ..... · -.. '.,.', : . ... : .~... ...· .,,.' .... ,.. '. . · · ...: :, ... ~ m',,~ .j~,'; :.~..,-":, '..:.:.:. ~,;", '?'? ,.-" , . . TOP OF 7" TIWLINER ·'· '~' ' ·' 9-5/8", 47#/ft, NT95HS, NSCC i[~1 I ~a384' I ,4 .4~, Cmt retainer or CIBP @13490' MD. , ~ 'lop of BHA @ 13494' MD ~ ~~:~.._7" exit window 13571-83' MD uck at 13623' MD Existing perforations P&A'd during '.~i: ?,?.i,!~:"- .... pre-rig operations PERFORATING SUMMARY X X X Ref. Log' MWD-GR (2-10-91) ( X X X SiZE SPF INTERVAL STAT U~ ( X X X 4-1/2 4 13,732-13,752 Squ'd ( X X X 4-1/2 4 13,790-13,840 Squ'd ~ 16''~ hol~ drille'--'-~ t-'~ 14,429'-'--~ M--~ ]' 4-1/2 4 13,852-13,883 Squ'd '( X X X 3 3/8" 4 13,905'-13,91 5 Open ( X X X 3 3/8" 4 13,915'-13,925 Open 14060' I PaT D 14150' II Date By Common ts ENDICOTT WELL: 3:2~~.~ 2/12/91 PCS PROPOSED COMPLE,T. IO.,N APl NO~...~0-029:2212 -~J~ 3/28/91 JLH INITIAL PROPOSED SUSPENSION DIAGRAM 10/29/93 RSA EWe COMPLETION - · 4/18/01 JLH =reposed Suspension BP EXPLORATION (ALASKA), lNG · I ~KA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 JeffHupp Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re; Duck Island Unit/Endicott 3-25A/N-24 BP Exploration (Alaska) Inc. Permit No: 201-020 Sur Loc: 2519'SNL, 759'WEL, Sec. 08, T1 iN, R17E, UM Btmhole Loc. 1259'NSL, 182'EWL, Sec. 32, T12N, R17E, UM Dear Mr.: Enclosed is the approved revised application for permit to drill the above referenced well. The revision is for a change in bottom-hole location. The provisions of the original approved permit dated February 20, 2001 are in effect for this revision. Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE CO_~IMISSION DATED this ~.~ [ r..Z- day of March, 2000 dlffEnclosures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ALASKA{' .AND GAS CONSERVATION COMM( ION ${,, PERMIT TO DRILL REVISED: March 15, 2001 20 AAC 25.005 , , ,, I [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work ~ Ddll [] Reddll lb. Type of Well Re-Entry [] Deepen Service Development Gas Single Zone Multiple Zone 2. Name of Operator ' ' 5. Datum Elevation (DF or KB) 10. Fiel'd and Pool BP Exploration (Alaska) Inc. KBE = 55.10' Endicott Field / Endicott Pool 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 L3~._ADL 312828 '4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 2O AAC 25.025) 2519' SNL, 759' WEL, SEC. 08, T11N, R17E, UM Duck Island Unit/Endicott , At top of productive interval 8. Well Number 72' SNL, 1564' EWL, SEC. 05, T11N, R17E, UM 3-25NN-24 Number 2S100302630-277 At total depth 9. Approximate spud date 1259' NSL, 182' EWL, SEC. 32, T12N, R17E, UM 03/18/01 Amount $200,000.00 12. Distance to nearest property line 113. DistanCe to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047502, 1259' MDI No Close Approach 4299.74 15744' MD / 101..7.6' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 13565' MD Maximum Hole Angle 95 ° Maximum surface 3711 psig, At total depth (TVD) 9900' / 4701 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casina ,Weight Grade Coupiin,q Len,qth MD TVD MD TVD (include sta,qe .data) 6" 4-1/2" 12.6# CR-13 ST-L 2612' 13415' 9989' 15744' 10176' 253CU. ft. Class'G' ,,,,, ,,,, ,, ,,,,, ,,,, ,,, , , , , , ,, ,, ,, , ,, , ,,, ,,, ,, ,, , ,, , ,,,, , ,,,, , ,,, ,, ,,, .......................... , ,,, , , ,,,, ,, ,,, , ,,, 1'3 I' r' I- ! ~ I I~ r~ _ , 19. To be cOmpleted fOr Redrill, Re:'en{'r:y,' and DeePen Operations. ' "' ~, .1~ L L I v L I.J Present well condition summary Total depth: measured 14150 feet Plugs (measured)MAR 1 6 Z001 true vertical 10398 feet Effective depth: measured 14108 feet Junk (measured) Alaska 0il & Gas Cons. Commission true vertical 10364 feet Anchorage Casing Length Size Cemented MD TVD Structural Conductor 92' 30" Driven 131' 131' Surface 2409' 13-3/8" 2629 cu. ft. Permafrost 2448' 2383' Intermediate Production 13345' 9-5/8" 3448 cu. ft. Class 'G' 13384' 9805' Liner 1009' 7" 454 cu. ft. Class 'G' 13141' - 14150' 9619' - 10397' Perforation depth: measured Open: 13872'- 13892'; 13905'- 13925' t' ' '~ Sqzd: 13732' - 13752'; 13790' - 13840'; 13852' - 13872' t. ~/ true vertical Open: 10171'- 10187'; 10198'- 10214' Sqzd: 10060'- 10076'; 10106'- 10146'; 10155' - 10171' '~0'~ 'A~i'a'¢hme~t~' ' []'Filing Fee ......... [] Prope~/Plat ........ I~ BOP Sketch ..... [] Diverter Sketch I~ Drilling Program" [] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Co'ntac'i Engineer Name~/'Nurnber:' Jeff Hupp, 564-5344 .................................................. Pr~pare~'B'~ N~rne/Nurnber:"' T~'rrie 'Hu~)bl~',"'564-4628"' -21' I hereby Certify that the foreec~:,a-is, true and ~orr'ect to the best of my knowledge ................ Signed JeffHup~Fez' .31P..¢::¢: ~UP/P Title Senior Drilling Engineer Date .:.:.. ': ..." .' '...: :';' :' '.: ~.'"' '":..'.. ",. ,. '::: .... :2 .!'.:.';.:"~'.:' :':'..':~':' ~?,'::.:. :; i' ..=.:. i: "~:.':..'.?:::.: 'C~mmJssl,~,,n..'~ O=Se!'On!lY:':~.... ::.!i:. ¥..~:::r'; ?.. ~:'~.'.....,..,.. :. ;'.::.,.,.~ :;:..: :.". ,.:.:. ":.: ':: :;.:t.' '11: ~::.=' ':,.':.':' '...: :"':..'.:...'. ? ...'..'.':':'." .':'::..: ?': ?.:.'?:'. ',:': :'.::' ..'..=.. ,' ::r:. "i'~ '..' ';'..: .. :. '::' :.;~ '. "'Permi't NUmber - "- '"['A~'l'Number'" ..... ... · .... -,.,.,.,.....,.....i,...,...,,.-. .... . ..... '"' J""' ' ~,D~'~o~,a~[~aie""' "' '1' S'e'~Co~er"ieti'~r' """'" 201-020 ]50-029-22125-01 ] ! I forother requirements 'Conditions of Approval: Samples Required I-1 Yes ~No Mu~"'E~og Re~quire~l [] Yes ]~No Hydrogen Sulfide Measures ~Yes [] No Directional Survey Required J~yes [] No Required Working Pressure for DOPE [] 2K [] 3K [] 4K 'l~5K [] 10K [] 15K [] 3.5K psi for CTU Other: ORIGINAL SfGNI~i) £9"'? by order of ~//,~ _Approved By D Taylor Seamoun'i Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit InfTriplicate BP ALASKA DRILLING & WELLS BP Exploration Date: To: From: Subject: March 15,2001 Tom Maunder Jeff Hupp Sr. Drilling Engineer Endicott MPI 3-25/N-24 Conventional Sidetrack Revised Work Scope: The 3-25A/N-24 TTRD sidetrack was permitted as 201-020, but due to conditions exhibited on 2-28, the scope of the work has been changed. The revised work scope reflects drilling this well as a conventional sidetrack to reduce the overall drilling risk as listed: · The 3-25A/N-24 well would be the deepest Endicott TTRD well to date (15,800' MD) · The upper zone pressure uncertainity can be better handled in the conventional ST. · The geologic uncertainity can be better handled in the 6" hole. · A real time LWD logging program is available in the 6" hole. · The annular clearance is increased in the conventional Sidetrack. Pre-Riq Operations 1. 2. 3. 4. 5. 6. 7. 4. 5. 6. 7. 8. 9. 10. 11. 12. Test the 9 5/8" mandrel packoff and tubing hanger (through test port) to 5000 psi. RU E-line. Run tubing and liner inspection log (Caliper). RU CTU. P&A existing perforations by squeezing cement into the perforations. Dress off the cement to the kickoff depth in the 7" liner. Perforate 7" casing at the kickoff depth to determine the Zone 3A formation pressure. Cut 4-1/2" tbg directly above the 9-5/8" production packer at 13050' MD. Freeze protect tubing with diesel from 1000' to surface. Set a BPV and remove the flow line. Or~erations MI & RU Doyon 15. ND Tree. NU & test BOP. Circulate well to kill weight brine. POH and lay down 4-1/2" CR-13 completion string. Mill and recover existing 9-5/8" x 4-1/2" production packer (2 trips). Dress off cement to kickoff depth. Run and set 7" mechanical whipstock. Mill 6" window off conventional whipstock. Drill 6" hole to TD at 15800' MD. (2300' of open hole) Run and cement 4-1/2" CR-13 liner. DPC perforate a 500' (+/-) interval with 2-/18" guns Freeze protect well. RDMO. Post Riq Procedure 1. Install flow line. 2. RU slickline and run live gaslift design. RECEIVED Jeff Hupp Sr. Drilling Engineer cc: 3-25A/N-24 Well File MAR 1 6 2001 Alaska Oil & Gas Oons. l;ommission Anchorage BPX { Endicott MPI 3-25A/N-24Sidetrack Summary of Operations: MPI 3-25/M-27 production has declined. The sidetrack, 3-25/N-24, will kick off at 13565' MD and target the K2B. Planned TD will be 15744' MD, (10,171' TVD). This sidetrack will be conducted in three phases. Phase 1: Plug off existing perforations and cut tubing. Planned for 3/17/01 - 3/18/01. · Lay in cement plug from top of Sand @ 13947' to 13600' with service coil. · Cut tubing above the production packer @ 13050'. Phase 2: Pull Tubing, Set Whipstock. Planned for 3/19101 - 3/20/01. · Rig up Doyon 15 and pull 4-1/2" CR-13 completion string. · Mill and recover existing 9-5/8"x4-1/2" production packer · Dress of cement to kick off depth · Run and set 7" mechanical whipstock Phase 3: Drill and Complete sidetrack: Planned for 3/21/01. · Doyon Rig #15 will be used to mill the window, drill and complete the 6" directional hole as per attached plan. The sidetrack will be completed with a cemented liner. · The well will be sidetracked within the Kekiktuk Formation. Shown below are the interval tops within the Kekiktuk. Interval Tops TVD F1 9798.1 K3A Above KOP K2M ~,~3-730.1 10010.1 K2a/S2A3~ 13744.88 100!5.! ~ 15512.71 , 10091:1 S1C 15752.06 ' 10171 MD Above KOP 977O 9915 9955 9960 10036 10116 TVDss __._.__-- Mud Program: · Phase 1: Seawater · Phase 2: Milling Fluid (9.5 -9.6 ppg) · Phase 3: Drilling Fluid (9.5 - 9.6 ppg) Disposal: · No annular injection on this well. · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 4-1/2", 12.6#, CR-13, ST-L cemented liner will be run from TD to approx. 13415' MD. Top of liner cement will be 150 ft above window. Approx. 45 bbls cement + Excess will be used for this liner cement job. Well Control: · BOP is 13-5/8" 5M Stack · Pipe rams, blind rams tested to 300 psi and to 5000 psi. · The annular preventor will be tested to 300 psi and 3500 psi. Directional · See attached directional plan · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Close Approaches · No close approaches Logging · An MWD Gamma Ray log will be run over all of the open hole section. · A real time Resistivity or a Memory Induction Log will be run in open hole. Hazards · Production from MPI 3-25/M-27 has been measured 63 ppm H2S. (12/4/00) · Surface Offset well H2S readings o MPI 3-27:95 ppm (12/17/00) o MPI 3-29:98 ppm (11/24/00) o MPI 3-23:100 ppm (10/12/00 o MPI 3/21: Plugged w/cmt · Lost circulation risk is Iow. Reservoir Pressure Res. press, is estimated to be 4701 psi at 9900ss (9.1 ppg). Max. surface pressure with gas (0.10 psi/ft) to surface is 3711 psi. R£C VF..D MAR 1 6 2001 Alaska Oil & Gas Gons. Commission At~chorage ]Well Name: ! 3-25a/N-24 Well Plan Summary [Type of Well (Producer or, inject,or): I We!! Design (Conventional, slimhole, etc.): IProducer TTRD SIDETRACK FSL FEL SEC TWP RNG surface L~cation: 2519 759 8 1 IN 17E Top of Kekiktuk is above'KOP: 72 1564 5 I~N I~E Target 2. B~)tt~m Hole Location: ,,~ 402 '5'66 32 12N' , ,17E I AFENumber: 1727031 i [,,Rig: I'DOYON 15 '] [Estimated Start Date: I Mareh 10, 2001 [ IOperating.days to D&C [23+4 I Formation Marker Well Bore: " Formation Tops 'MD ,"TVDss, EMW' RESERVO'i'P~PRESSURE , BASE HRZ 13385 9743 Above KOP ' , , LCU 13385 9743 Above KOP ...... KEKIKTUK "~ Top 13385 9743 Above KOP ' ' ' " Fl, 1338.5 9743 10.0 ppg..' 5150, psi ~ 990'0' TVD Above KoP K3A 13420' 9770' ' 9. ippg 4623 psi (Based on 4701 psi ~. 9900' TVD) ' ' KoP 13565 .... 9876 ...... KoP in th'e K3A sand ..... ",'. ...... "' K2B 13620'' 9915' 9.'0'ppg ' ,,, ' ...... ,,,,' ,' ,. ,, K2M 13635 9924 9,.0 ppg, ,,, K2A/S2A~' 13670 ''994i 8.3 ppg, ,, ,, , , S2A2 Shale 15286 10019 S2A1 15346 1003'2 8.4 ppg ...... , ..... ' " ,, "' SIc 15722 '101i,6 8.4 ppg , .... ,TD S1B 15~44 10.121 4.8 ppg 25,0,0psi, , (,5,~TV, D) .. Changes in the depths based on: · Deeper to give additional cushion to the suspected high pressure zone · Deeper to avoid coal sections TREE,: 4-1/16" /5000 psi /McEvoy/ Baker Actuator WELLHEAD- 13-5/8" / 5000 psi Mc-C- ooy) R.T. E LEV---- 55.1' B.F. ELEV = 15.28' MAX. DEV. --- 55:10 840 0' M.D. 13-3/8", 68#/ft, NT80 CYHEBUTT CSG I 9-5/8", 4 7#/ft NTSOS XO to NT95 HS 11396' SSSV LANDING NIPPLE OtiS (3.813" I.D.) W/SSSV I N M IN I.D. 2.0" 1434' 4-1/2", I 2.6 #Iff, I 3 CR, NSCT GL~s ~amco MMGM)~ (1-1~"RK L~c[ No. -rVDSS MD-EKD 7 3514' 3932' 6 5766' 7365' 5 7353' 9958' 4 8356' 11480' 3 8877' 12208' 2 9100' 12538' I 9179' 12644' TOP OF 7"TIWLINER I 13141 ' 9-5/8" , 47#/ft, NT95 HS, N SCC [ 13384'I I 4-1/2" LINERTOP @ 13415' --~ Existing perforations P&A'd during pre-rig operations PER FORATING ~UM MARY Ref. Log: MWD-GR (2-10-91) SIZE SPF I NT ERVAL STAT US 4-1/2 4 13,732-13,752 Squ'd 4-1/2 4 13,790-13,840 Squ'd 4-1/2 4 13,852-13,883 Squ'd 3 3/8" 4 13,905'-13,91 5 Open 3 3/8" 4 13,915'-13,925 Open PDT D 14 060' 7", 2 9#/ft, NT95 HS TKC I 14150' Date 2/12/91 PGS 3/28/91 JL H 9/93 I RSA I O/2 ! 03/15/01 ~ JDF Commen ts PRO POSED COMP LETION INITIAL RWO CO M P L ET I O N PROPOSED ST 4-1/2 SWS" NIPPLE .... I 13029, (Parlor) (3.81 3" ID) TIW R H Latch I 13087' 9-5/8x4 1/2" PACKER I TIW HBBP (4.00" I.D.) 4-1/2" SWS Nipple, Parlor (3.813" ID) 4-1/2" SWN Nipple, Parter I 13172 3.725" I d 4-1/2" Wirelineentry guide 4-1/2" 12.6 ppf 13-CR STL @ TDI XXX XXX XXX XXX XXX XXX XXX 6" hole drilled to 15.800' MD (+/-) MARKER I 13431 ' SAN D I 13 947' ENDICOTT WELL; 3=25NN-24 APl ND. 50-029=2_21_25-01 PROPOSED COMPLE'EION DIAGRAM BP EXPLORATION (ALASKA), INC TREE: 4-1/16"/5000 psi/McEvoy/ Baker Actuator Wl~LLHEAD: 13-5/8" /5000 I~si.~cE~oy) R.T. E LEV = 55.1 ' B.F. ELEV = 1528' MAX. DEV. = 55:10 840 0' 13~3/8", 68#/ft, NT80 CYHE BUTT CSG I I 9-5/8", 4 7#/ft NT8 OS XO to NT95 HS I 11396' SSSV LANDING NIPPLE OTIS (3.813" I.D.) W/SSSV IN MIN I.D. 2.0" 14 34' 4-1/2", I 2.6#/ft, I 3 CR, NSCT GLM's(Camco MMGM), (1-1/2" RK Latch) TVDSS 3514' 5766' 73 53' 8356' 8877' 91 00' 91 79' MD-BKB 39 32' 73 65' 99 58' 11 480' 12208' 12 538' 12 644' TOP OF 7" TIW LINER pER I=ORAllNG SUMMARY Ref. Log: M~O-GR (2-10-91) Isms= I,, 4'1/2 I 4.-1/2 I 4-1/2 I 3 3/8/ 3-3/8'1 ~PF I INTERVAL 13,790-13,840 13,852-13,883 13 905-1 392 5 13 872:13 892 ' STATUS SQD Sq u'd Sq u'd OPEN open PBTD I 14060,I ~-- ~.~ 7"' 29#/ft' NT95 HS I 14150' TKC 4-1/2" '"SWS" NIPPLE I 13029' (ParteO (3.81 3" ID) TIW R H Latch I 13087' 9-5/8 x 4 1/2" PACKER [ TIW HBBP (4.00" I.D.) 13091 ' 4-1/2", I 2.6#/ft I 3 CE, TAILPIPE 4-1/2" SWS Nipple, Parler 13111 ' (3.S13" ID) 4-1/2" SWN Nipple, Parler I 13172 (3.725" I D) 4-112" Wimline entry guide I 13183 WLEG ELMD I 13189' RECEIVED JAN 1 9 ZOO1 Alaska Oil & Gas Cons, Commission Anchorage [] [] .ARK~CCLI~CL~) I 13431' MAR 1 6 ?_001 Alaska 0it & Gas Cons. ~;ommission I I Date By Comments ENDICOTT WELL: 3-25/M-2Z 2/12/91 PGS PROPOSED COMPLETION APl NO. 5~22125 3/28/91 JLH INITIAL ~2MPLETION DIAGRAM 10/29/93 FlSA RWO COMPLETION 3/14/98 DAV ADD PERF BP EXPLORATION (ALASKA), INC i BOP ST~C~ ELEVA'i'II~ I I S:URFACC DNERTl~ CONF)G;UP.,q.llO0~ ~ KOO~EY, lB0 PAL. 6 STAIlI:)X ~ 575 V/tlS, 25 HP AIR PUUP: .m~TIONAL F SE]9.JES. NL SHArFCR ! · il fl i~ · # ii I AJ~UMULA'rOR I~HIF'OLD 16 1~0131.E~, lid O, AL~LDNS ~ Nm~RO. Gi~I BACKUP EIOTI'LES 4 BOTTLES, 3GQC} PS~ YALVE LEGEND . CHOKE BOTTO~ RA~S BUNB TaP PiE ~S ~HU~R RIg,4OIE PANEL IN I)O[~.-II)J,l~£ UT *, RECEIVED IlAR 1 9 2001 nlakaOil &Gas ConS.~~, ~e 2-1/!$' ~ 2-1/16' 2' I-I/4' ! 7 1/16" BOP STACK ARRAN(~EMENT 3-1/a' i~NU*L - ~ · J 2-l/16'l&k'~JN. 701/16' · 4-1/16' 7-1/16'I'ESTSPOOL -- 13 S/B; SQQO PG, IO' ~ Gel]~O~S ,1 I/I' SOQQ PS~ G~ WL~ I BOP STACK ELEVATION · 21 I/4' 2QCO PSi, blSP ~ ii I II ....... 21 I14. 2~0 I~ ~ ~URFACE D~RTER CONFIGU~TION · 12' ISQ PSi h'll~. 12' FI.,~'O 'VE~T I1'"' 71/16- eof) STACK II A~,d~[~41~lT (5~d) I I~ ,c,,r~:~ ~ ~ ,, II m I .m~ ! Alaska Drilling Endicott.Dl'~ 3-25A/N-24 WP$~.' 3~-24 WP09 ~.~ ~: ..... ~OSAL REPORT '~ '~ 15 March, 2001 Your Reft Generated in 'Hive' (w/ Kyle Johnson & Jeff Hupp) Coordinates: 5970978.01 N, 270283.14 E (70° 19' 292826" N, 147° 51' 45.8148" W) Kelly Bushing: 55. lOft above Mean ~a Level O R ! I.. l.-IN E SERVICES Proposal Ref: pro967 A Halliburton Company Alaska State Plane 3 Measured Depth fit) 13565.00 Incl. Azim. Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS- 3-25A/N-24 WP09 Your Reft Generated in 'Hive' (w/ Kyle Johnson & Jeff Hupp) Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (ft) (ft) (ft) (ft) 40.394 0.293 9876.38 9931.48 7848.83 N 2977.12W 13595.00 45.089 358.823 9898.41 13600.00 45.968 358.551 9901.91 13625.00 50.371 357.302 9918.58 13700.00 13800.00 13826.02 13884.93 13900.00 14000.00 14002.82 14100.00 14200.00 14300.00 14400.00 66.543 353.435 9957.69 '"'"' 93.9 10029.07 8148.54 N 94.6~ 33~~. 9~:45 10021.55 8243.28N 94.657~~8 9966.22 10021.32 8245.86N 94.657 336.748 9958.33 10013.43 8334.85 N 94.657 336.748 9950.21 10005.31 8426.43N 94.657 336.748 9942.09 9997.19 8518.00 N 94.657 336.748 9933.97 9989.07 8609.58 N 9953.51 7869.18 U ..... .~;~~9.W 9957.01 7872~i!~:~>% 2~.37 W! 9973.68 :.,~;~ili!:::i~78,~i~i:~'~. ~8.05 W 2997.91 W 3002.86 W 3014.54 W . 3017.72 W 3048.43 W 14425.83 14500.00 14600.00 14698.98 3049.53W 3087.77W 3127.12W 3166.47W 3205.82W ~i~i~ii~ Alaska Drilling l Wells ~;~!~i~!i~,. :.:~.i:i~ ...... Endicott DI-SDI Global ~p~:~~i,i~i~? Dogleg Vertical .Northi~s~ ~ihgs Rate Section Comment ': ) ~789 N'¥~ 26~47.66 E 7655.10 S.T. @ Begin Dir @ 16°/100ft· '~::~,~. 13565.00 ff MD, 9931.48 ft TVD ..-~-, ~}~!;?~)~:.. 7" Liner 597893~.64 N Continue Dir @ 16.00°/100ff· 13595.00 ft MD, 9953.51 ft TVD 5978938.21N 5978956.83 N 5979020.43N 267548.11E 16.00 7669.61 267548.14 E 18.00 7672.19 267548.03 E 18.00 7685.84 267544.64 E 22.00 7734.48 Continue Dir @ 18.00°/100 fi: 13625.00 ff MD, 9973.68 fl TVD 94.657 336.748 9931.88 9986.98 8633.23 N 3215.98W 5979116.71 N 267533.06 E 22.00 7812.56 5979142.38 N 267528.89 E 22.00 7834.11 5979200.32 N 267518.98 E 0.00 7883.10 5979215.10 N 267516.25 E 10.00 7895.74 5979310.73 N 267488.45 E 10.00 7984.44 End Dir, Start Sail @ 93.854°: 13826.02 ft MD, 10034.06 ft TVD Begin Dir @ 10°/100ft: 13884.93 ft MD 10030.10 ft TVD 93.171 329.464 9926.81 9981.91 8699.18 N 3249.43W 91.090 319.676 9923.08 9978.18 8780.50 N 3307.29W 89.000 310.000 9923.00 9978.10 8850.20 N 3377.39W 14700.00 88.964 309.905 9923.02 9978.12 8850.85 N 5979313.35 N 267487.43E 10.00 7987.05 5979403.47 N 267451.93 E 0.00 8077.02 5979496.21N 267415.41E 0.00 8169.59 5979588.94 N 267378.88 E 0.00 8262.17 5979681.68 N 267342.35 E 0.00 8354.74 End Dir, Start Sail @ 94.657°: 14002.8 ft MD, 10021.32 ft TVD 3378.17W 5979705.63 N 267332.92 E 0.00 8378.66 5979772.57 N 267301.50 E 10.00 8448.94 5979855.62 N 267246.16 E 10.00 8547.36 5979927.44 N 267178.22 E 10.00 8646.22 5979928.12 N 267177.46 E 10.00 8647.23 Begin Dir @ 0.00°/100 ft: 14425.83 ft MD, 9986.98 ft TVD Continue Dir @ 10.00°/100 ft: 14698.98 ft MD, 9978.10 ft TVD 15 March, 2001 - 11:02 Page 2 of 5 DrillQuest 2.00.08.004 Alaska State Plane 3 Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) 14800.00 85.406 300.546 9927.94 14900.00 81.972 291.096 9938.96 15000.00 78.756 281.490 9955.73 15055.30 77.107 276.092 9967.30 15100.00 77.107 276.092 9977.27 15200.00 15300.00 15400.00 15500.00 15600.00 Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS- 3-25A/N-24 WP09 Your Reft Generated in 'Hive' (w/ Kyle Johnson & Jeff Hupp) Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 77.107 276.092 9999.59 77.107 276.092 10021.90 77.107 276.092 10044.2~ ~99.31~ .... ~23.25 N 77.107 276.092 10066.~? .~21.63 '% 33.59 N 77.107 276.092 10088. .94 90~.94 N 15700.00 77.107 276.092 ~. '~,101'~'~'.25 9054.28 N ~21.80 W 15744.13 77.107 276.0~~ '~0176.10 9058.85 N ~64.57 W .. ~' . '"..~. ~;:~:~ ~-~' ~.'.... ~ .... · -... ~ 9983.04 8908.40 N 3459.65W 9994.06 8951.66N 354~.9~i~ 10010.83 8979.32 N 3~8~ 10022.40 8987.59 N 369:~ 10032.37 899~iN~~- 37~.23~7 10054.6~~~6.~ '. 3837.16W 10077.0~ ~ 3934.08W 4031.01W 4127.94 W 4224.87W Global co~,dinate~:~? Dogleg ~Northi~g~ '~ Easti~gs' Rate '~'~ '~. ~...,. 0.00 ~34.~ N 267~9.81 E 10.00 N 0.00 59800'~54 N 266863.07 E 10.00 5980080.49 N 266819.90 E 0.00 5980093.80 N 266723.34 E 0.00 5980107.11N 266626.77 E 0.00 5980120.41N 266530.20 E 0.00 5980133.72 N 266433.64 E 0.00 5980147.03 N 266337.07 E 0.00 5980160.33 N 266240.51E 0.00 5980166.21N 266197.89 E 0.00 All data is in Feet unless.otherwise stated. Directions and coordinates are relative to True North. Vertical depths are rela{i~/e to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.197° (15-Mar-01) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well and calculated along an Azimuth of 315.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15744.13ft., The Bottom Hole Displacement is 10055.46ft., in the Direction of 334.275° (True). Alaska Drilling & Wells Endicott DI-SDI Vertical Section Comment 8745.53 8839.30 8925.67 8969.29 End Dir, Stad S~l @ 77.107°: 15055.30 ff MD, 10022.40 ffTVD 9003.20 9079.05 9154.90 9230.76 9306.61 9382.46 9458.32 9491.79 Total Depth · 15744.13 ft MD, 10176.10 ft TVD 4 1/2" Liner 15 March, 2001 - 11:02 Page 3 of 5 DrillQuest 2.00.08.004 Alaska State Plane 3 Comments Measured Depth (ft) 13565.00 13595.00 13625.00 13826.02 13884.93 14002.82 14425.83 14698.98 15055.30 15744.13 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS- 3-25A/N-24 WP09 Your Reft Generated in 'Hive' (w/ Kyle Johnson & Jeff Hupp) 9931.48 9953.51 9973.68 10034.06 10030.10 Casing details From '.. -'"' Measured Vertical Depth Depth (ft) (ft) 10021.32 9986.98 9978.10 10022.40 10176.10 · .. '~}~. ~;" ~, ~ ~:.~. ... ..... :. 7848.83 N 7869.18 N 7891.36 N 8076.24 N 8133.85 N 8245.8~i~- ~'~'~'*~ 8633.2~i 88..5..~~ ~'~'~..~77.39 W ~ '~(~96.90 W ':~; ~64.57 W TO Measured Vertical Depth Depth (ft) (ft) Comment 2977.12 W S.T. ~ ~10~: 135;;'.00 ff MD, 9931.40 fl ~D 2977.29 w ~.~ir ~.~~: ~3s95.00 ~ MD, 99S3.S~ ~ ~D 2978.~&~ ..... 00"~0 ~: 13625.00 ff MD, 9973.68 ff ~D 30~~' ~nd ~ S~S~I ~ 93.854 : 13826.02 ff MD, 10034.06 ~ ~D 30~4 W ,.~ ir ~0/10~: 13884.93ff MD 10030.10ff~D 304 End Dir, Stad S~I ~ 94.657°: 14002.82 ~ MD, 10021.32 ff ~D 3215.98~" Begin Dir ~ 0.~°/100fl: 1~25.83 ff MD, 9986.98~D Continue Dir ~ 10.00°/100 fi: 14698.98 ff MD, 9978.10 ff ~D End Dir, Sta~ S~I ~ 77.107°: 15055.30 ff MD, 10022.~ ff ~D Total Depth · 157~.13 ff MD, 10176.10 ff ~D Casing Detail <Surface> <Surface> 13565.00 9931.48 7" Liner 13565.00 9931.48 15744.13 10176.10 4 1/2" Liner Alaska Drilling & Wells Endicott DI-SDI 15 March, 2001 - 11:02 Page 4 of 5 DrillQuest 2.00.08.004 Alaska State Plane 3 Targets associated with this wellpath Target Name K2B cptl (wp07 T1) kwa 2 TD Zl (wp07 T4) ~ ~ ~..~: Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS- 3-25A/N-24 WP09 Your Ref: Generated in 'Hive' (w/ Kyle Johnson & Jeff Hupp) ~i~ T a t~E n t~/~y C o o r d i n a t e s ~:~ ~?' Nothings Eastings ~. '-.~ ~ Mean Se~:~:~~al ~rdin~: Mean S Iob~oord nates: ~;~. ~ (~'~raphical Coordinates: "~ Sea Level/Global Coordinates: Geographical Coordinates: (ft) (ft) Alaska Drilling & Wells Endicott DI-SDI Target Target Shape Type 10030.10 8133.53 N 3014.57 W Point 9975.00 5979200.00 N 267518.94 E 70° 20' 40.2721" N 147° 53' 13.8933" W 9978.10 8849.75 N 3377.60 W Point 9923.00 5979927.00 N 267178.00 E 70° 20' 47.3148" N 147° 53' 24.5097" W 10176.10 9058.13 N 4364.82 W Point 10121.00 5980165.50 N 266197.62 E 70° 20' 49.3592" N 147° 53' 53.3601" W 15 March, 2001 - 11:02 Page $ of $ DrillQuest 2.00.08.004 Sperry-Sun Drilling Se ices Proposal Data - 3-25A/N-24 WPS - 3-25A/N-24 WP09 , ] . ...... I ...~f~.~...~ ...~.~ .........i ................................... (~.~'~ ......... ~.~ .......... ...... ".?. :'::::~ ~'"::'? i:".':/i~ ~?,~T'f~! 'i.'~l -1 ~13565.001 140.39~!. 0.293] 9931.481 178~$.83 Ni2977.12"W=' ' ' } .... i ' ~ 7~5.~0i ......... ~ ................. ~ · . ~ ................. ~.. ........ · ............................... ~..~ ................... ~.- . ......... , ......... . .......... . .................... { .............. ! ........................ = 3 !13625.00= 30.00150.371;'357.3021 9973.681 20.1717891.36 Ni2978.05 W= 18.000~ 17.6061 -5.067; 347.460' .7685.84= 4,,~13.826.02i 201.02193.854 348.542.10034.061 . 60.3818076.24 N; 3002 . 86' W 22 .'~, 21.631 -4.358 347.416 7834.11 ...... : ................. f ! ......................................................... - .................................. : ...................... · .... s ]~.~,,4~:~: s~.~.!~3.,~' 3.~.s42J',o.o.30.~.oJ,. "-~.~J~.~.3:~..~.~.~i.:~o~.4.s,,,,;w: 0.::.':,.: 0.000. 0.000 0.000 78~3.~.0. ! ....... ~..i~.~.~:~.h~.~%~`~s?~3~.h~!.~.~.~.~.~.?~!:~=~.:%~;~~j.~`~.~w~ .... ~.0'.'0001 0.~8:].] =~.o..oos: 2',,~.~3',~ '~.~"/.0~ '. .......... 4 ........... , ............. ~ ~..., .............. J.. ' .............. 1 .................. ........................................ ' .......... · .................................................... ' 7. 'J14425 83 423 01:94 657]'336 7481'9986 98J -34.34J8633.23.NI3215.98 W'. ::..:~.i' 0.000. 0.000 0.000 8378.66 i ........ .~ ......... ~ ..... ~ ................. : .......... ,, ' . :. ...... t ~ .................. : ....... ~ ...... .................. ! ................ ........... ! ............................. ] , , ~ . ' 8 114698.98j '273.'1§j89.000 310.i'".~' 9978.10 -8.8'!:8850.2C N 3377.39 ['~ 10.000 -2..0711 -9~792! 258.704- 8646.22: ................. j ........................... ~ ......................... i ..........................10022 40 '4'4'308987.'.59 N! "' '! ................................. '. .................. . ~ ................. .......... ~. ! ................ .'. ......... I ............... ~.~'~)~.~.0"~ '~o.oooi '.'-~'.':~.~sj' -~'.~',~.'24~.~'7~ 8~ = 9 .,:LSO55.30j:.356'.'31 77.107 276.092 ...................................... ~" ...... ' '. ........ ........ :.. !':~". ~;~.~s.7.~.:~~6j.~`.t~..~.~:.~.~2j~.~.?~ ..',s3.?o!~os~ ~f,~-.5'7'~ o.c~o'~) .......... 0"."6'~0'~ ...... ~"i"~C;O':. ......... 15 March, 2001 o 11:01 - I - DrillQuest Sperry-Sun Drilling Services Proposal Data - 3-25A/N-24 WPS - 3-25A/N-24 WP09 FJD-' .Del~ta..'..-nc!'in.. Az±muth . %~VD Delta [ N0rthings" Eastings-.. i Do~l---~ .. A. !' A. Turn =Tool[ace VS "i- "(ft) ''. t4~9,' , -.' ':~:-'; . '-(o}.~: '(f~') [--'~ -] - (ft)' ' .' - (ft) :[ °/~00f~[]"-.Build-'-.; °/i0'0ft'.".~ · ' 'f.' ' (3179): ' I~'l" .. /:o'~' . ...... ' ' .I .. (~t..} ..... i" ." . .'. ' : j'" .-'"" ' .'f-~-O~lnn~~ .' :' . :'-:'t'O%--.' · J-1" "" 1.3565.0~' ...... ':;'"'~; '"':' I .......... :~ 0:~3'~ "2;0.47"' "':~ "~'"'"'"-' '9~6.3~i: '' ' ............ ~5978914'. 29' ..... : ..... N~675&?. 66~ ........... ~ ................. Ei'"::"i .............. ':' ':;:;i' :'""'"': ........... ' ; .............. - ..-': ............ .;':- .'. ' ""; ............ :' '."':~"~.: ........... ~655~ 10i :"- "-'""" '~ ~ ...... ~__. : . .._~. : .:. . '" I-..' ~ .' "..~'~1 ]... ........ ; ................ ; .............. J .......; .................. :..~ ..... ~ ... ;~- ~: ........ ; .......... ~._..~ ...... ~.~ ......... ~ ....... ~ ........... . .... ~_:.~ .......... 5 ;~3~4..931 58.9~i93.~8S4 350.2t.6 ~975..00 .'~3.9~:=5~?~200'.32 N16751~98 ~i 0 000i' '0-000 ............................... : ............................................................................... =' ............................ : ' ' }"";-- ~" ..... :- ~"~'":' ~-'---;i':' ~:~"::' ...... ~JJ:"-"~';-~--~-: ~ 6 ~11002-.827'117.89{94.657 338.502 ~6~:'~2i'-.~-8'.78'5~7~313.35 N~6748~.43 El 10.000! · 0.681 i ~-~4~5.a3! ~23.01~941'657-.33a.~0~i.'9'93Z.eai '-~4.3'4:59797.05.63 H~67.332.92 'Ei 0.000{ ' 0.000[ :-0~0001:.',.-0~000I' 8378:'66! ..... a. ............................ i ............... ~ ................ F ............... i .............. ~ ................. ~ .... ~ ..... · .................. ~ ~ ........ ~ .... ; .... '.--~ .... .~?..-: .... ;~---~.-.? ....... ~--.~ ] ;14698.98;'; 273':~5{ ~9.000' 31~.754i 9923'-.:00'i '-8.87~5979927'.44 NG6?~TG.22' Ei 10.000! .-2.07i~- -9.792i.~' 258.70&] ~8646.22j , - : . . . .... } ....... ~ ........ ~ .~....:...--.~-: .... i - · I. ' i-. ....................................... ~ , i ............. i ........ - ...... · ....................................... i .......... . ....... ~.: .......... ~o, 1zs744.~3!'~'.'~3177:i07~'2~7.~46i~o~21.oo~ 153'.~0~5~8016~.21 ~;~i~?.~ ~} 0.000~ · 0.000i -.0~000 15 March, 2001 - 11:01 - I - DrillQuest Sperry-Sun Anticollision Report Date: 03/15/2001 Time: 10:17:48 Co-ordinate(NE) Reference: Well: 3-25/M-27, True North Vertical (TVD) Reference: 29' 25 1/6/1991 00:00 55.1 Page: I Company: BP Amoco Field: Endicott Reference Site: End SDI Reference Well: 3-25/M-27 Reference Wellpath: Plan: 3-25A/N-24 Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference - There are Tll~li~l~lls in this fl~ld~: 3-25/N-24 Plan #9 & NOT PLANNE[~ Interpolation Method: MD Interval: 100.0000 ft Error Model: ISCWSA Ellipse Depth Range: 13565.0000 to 15744.1609 ft Scan Method: Tray Cylinder North Maximum Radius:1770.3570 ft Error Surface: Ellipse + Casing Casing Points MD TVD Diameter Hole Size Name ft ft in in 15752.5000 0.0000 2.7500 3.7500 Case2 Plan: 3-25/N-24 Plan 99 Date Composed: 03/12/2001 Version: 1 Principal: Yes Tied-to: From: 1: Schlumberger GCT mul Summary <2' .......... ~--~-;----iioffset Wellpath ,,i2~--, ..... ~ ........ > · Reference Offset ctr;ctr No,Go inlloWable Site : : .~ Well ~Wellpath ~MD MD Distance: Area Deviati°n Warning : : i: ,. : : ft:: : : :'ft: ~ ft ift ~ · End MPI 1-29/M-25 1-29/M-25 V1 15660.448913500.0000 881.7443346.1365 548.4373 Pass: Major Risk End MPI 1-33/M-23 1-33/M-23 V1 End MPI 1-33AJN-24 1-33A/N-24 V3 End MPI 1-33A/PB1 1-33A/PB1 V3 End MPI 1-33B/L-24 1-33B/L-24 V2 End MPI 1-65/N-25 1-65/N-25 V1 End MPI 1-65/N25PH 1-65/N25PH V1 13625.000013413.10001517.7917352.87481174.2445 Pass: Major Risk End SDI 3-07/N-28 3-07/N-28 V1 End SDI 3-07A/L-29 3-07A/L-29 V5 End SDI 3-09/L-28 3-09/L-28 V1 13735.697714600.00001052.9150415.7976 637.7631 Pass: Major Risk End SDI 3-25/M-27 3-25/M-27 V1 13599.864413600.0000 1.8961 0.0010 1.8951 Pass: NOERRORS End SDI 4-10/M-28 4-10/M-28 V1 13583.775913500.00001353.1725391.4398 961.8123 Pass: Major Risk ~ROG WELL DETAILS ANTI-COLLISION SE'IqqNGS COMPANY DETAILS SURVEY pROGRAM WELLt,ATH DI:"TAII ~ Name +N/-S +E/-W Notlhing Eas~g Lafit~d~ LongiR~de Slot BP Amoco De4~Fm Dep~hTo Survey/Pl,m Tool Plan: Y25A/N-24 Interpolation Method:MD Interval: 100.0000 3-25/M-271595.75OD-1998.0075 5970978.0311 270283.2011 70~19~20.400N 147=51'45.808W 25 Depth Range From: 13565.0000~o: 15744.1609 Calculati,~M,~od: Mi~imumCur-catu~ 13565.00~1574.4.1609Planned:3-25/N-24Phn$gVI MWD ~arcntW¢llpalh: 3-25/M-27 Maximum Range: 1770.3570 Reference: Plan: 3-25/N-24 Plan g9 Enor System: ISCWSA T~ ~nn MIk 13801.~O00 S~a Melfiod: TravCylindexNorth Etmr Surface: Ellit~al+ Casing Rig I~:,'~r, 15 Warning Method: Rul~ Based Ref. I)alum: 29: 25 I/6/199! V.SoClh,n Origin AngI° +NI-S + F./- W I~x~m TVD From Colour ToMD From Colour To MD 13500 ~ 14000 13500 14000 14000 14500 14000 14500 ~ ~ 1-33/M.23 (1-33/M-23). Maj~n' Risk ----1456 0 14500 15000 1500014500 1550015000 ~ 15000 15500 ~ 1-33A/PBI (I-33/'d'l'Bl).Maj~,rRisk ,~ 1-33B/1~24 (I.33BIL-24). Maj~n' Ri~,k ~ 15500 16000 15500 ......... 16000 ~ I-~$/N.25 (1.65/N.25). M4or Risk . i~ 16500 17000 16500 17000 17000 ..... 17500 ~'~ 3.~5~1.27 {3-25/M.2'/). NOF. RRORS 3-09/I.-2g {3-~9/I~28}. Maj~ r Rkk ~ XX 18000 18500 ~ 0 18500 19000 ~ %18500 ~ 19000 ' 203000 ~ 20500 ~ ~ - 20500 --1200 P~: .'L25/N-24 Plan ~ (3-25/M-27/Phn: 3-25A/N-24) Checked: Dale: R¢¥Jowed: -14.56 180 Travelling Cylinder Azimuth (TFO+AZI)[degl vs Centre to Centre Separation [100 [t~,],.~: i;21;i SECTION DETAILS Sec K~D lnc Azi TVD +N/-S +FJ-W l){.eg TI:acc VSec Tatg¢l 1 13565.0000 40394 O,M~ 9931.4'/62 7849.6182 -2975.1993 O.000 0~0 8_~3.1f~3 13595.0{X}0 45.089 358338 9953.5034 7869.9714 -2975.3626 16.000 -12.540 83813770 13625.0000 50371 357317 9973fi757 7892.1488 -2976.1194 18.O~0 -12_MO 84013867 13826.0321 93.854 348.542 10034.0591 80?7.0433 -3000.9089 ~2.000 .12.606 8579.2279 13884.93"/3 93.854 348342 10030.1000 8134~439 -30123844 0.000 0.000 8636.1904 K2Bcpll('apOTTI) Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [600ft/in] 140oz~1~ ~.6s7 _~.7n~ 1~1.3:,~ s:4~9: -~?~s io.0o0 .~ g 140.5.8309 94.657 336.748 9986.9747 8fi34.0207 -3214.0241 0.000 0.000 91733155 14698.9968 89.000 310.~0~ 9978.1000 88~0.9938 -3375.4411 ~0.000-IOI.297 9439.0366 9 15055.2974 '/-/.107 276.O92 100223971 89883798 -3694.9422 10.000-111.021 9701.4384 1015744.164D 77.107 276.092 10176.1000 90~9.6457 -4362~,469 0.000 0.00~ 100553403 TDZI {w'p07T4} BP Amoco ( 'lanning Report- Geographic Company: BP Amoco Date: 3/14/2001 Time: 17:07:42 Page: 1 Field: Endicott Co.ordinate(NE) Reference: Well: 3-25/M-27, Troe North Site: End SDI Vertical (TVD) Reference: 29: 25 1/6/1991 00:00 55.1 Well: 3-25/M-27 Section (VS) Reference: Well (0.00E,0.00N,334.29Azi) Wellpath: Plan: 3-25A/N-24 Plan: 3-25/N-24 Plan #9 Field: Endicott North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 3 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: Bggm99 Site: End SDI TR-11-17 UNITED STATES: North Slope Site Position: Northing: 5969322.46 ft Latitude: 70 19 4.709 N From: Map Easting: 272231.79 ft Longitude: 147 50 47.497 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 14.50 ft Grid Convergence: -1.74 deg Well: 3-25/M-27 Slot Name: 25 3-25/M-27 Surface Position: +N/-S 1595.75 ft Northing: 5970978.03 ft Latitude: 70 19 20.400 N +E/-W-1998.01 ft Easting: 270283.20 ft Longitude: 147 51 45.808 W Position Uncertainty: 0.00 ft Reference Point: +N/-S 1595.75 ft Northing: 5970978.03 ft Latitude: 70 19 20.400 N +E/-W-1998.01 ft Easting: 270283.20 ft Longitude: 147 51 45.808 W Measured Depth: 40.60 ft Inclination: 0.00 deg VerticalDepth: 40.60 ft Azimuth: 0.00 deg Wellpath: Plan: 3-25A/N-24 Drilled From : 3-25/M-27 Tie-on Depth: 13801.00 ft Current Datum: 29: 25 1/6/1991 00:00 Height 55.10 ft Above System Datum: Mean Sea Level Magnetic Data: 11/15/2000 Declination: 27.44 deg Field Strength: 57399 nT Mag Dip Angle: 80.83 dog Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ff ff ff deg 0.00 0.00 0.00 334.29 Plan: 3-25/N-24 Plan #9 Date Composed: 3/12/2001 Version: 1 Principal: Yes Tied-to: From: 1: Schlumberger GCT mul Plan Section Information '::.MD:' . '!Incl. "Azim.' ~.. i.'T,.VD :. i'i +N/,S :' .. "+E/.W' :.:: :DLS . · "BUild.. '"Turn .".TFO'. Target ".. " " .... ff.;i ".'d'eg':~ · de'g:""..:rt.:. :.":'"'::':ft:": . '. · ~ft.' '; deg/l=00ft"deg/i0'0ft:deg/100ft'.:.deg ........ '' "' :" 13565,00 40.39 0,31 9931,48 7849,62 -2975,20 0,00 0,00 0,00 0,00 13595,00 45,09 358,84 9953,50 7869,97 -2975.36 16,00 15,65 -4.90 -12,54 13625,00 50,37 357,32 9973,68 7892,15 -2976,12 18,00 17,61 -5,07 -12,54 13826,03 93,85 348,54 10034,06 8077,04 -3000,91 22,00 21,63 -4,37 -12,61 13884,94 93,85 348,54 10030,10 8134,64 -3012,58 0,00 0,00 0,00 0,00 K2B cptl (wp07T1) 14002,81 94,66 336,75 10021,33 8246,63 -3047.57 10,00 0,69 -10.00 -85,65 14425,84 94,66 336,75 9986,98 8634,02 -3214,02 0,00 0,00 0,00 0,00 14698,99 89,00 310,00 9978,10 8850,99 -3375,44 10,00 -2,07 -9,79 -101,30 kwa 2 15055,31 77.11 276.09 10022,40 8988,38 -3694,94 10,00 -3,34 -9,52 -111,02 15744,17 77,11 276,09 10176,10 9059,65 -4362.65 0.00 0,00 0.00 0,00 TD Z1 (wp07T4) Section 1: Start i;'i" ::.MD. '' .Ini~i:" Azim' :' 'TVD. +N/;S'::' "+E/,W . . . VS. DLS. "Biiild.. Turn ...' .' TFO .... · · ..I '.".":.ft": ..'deg... ';deg "'".":ff:.'i:.::': .... :.ft.!'.:. ':'.:..: "ff :. ... ..ff".....deg/10'0ff:deg/100ff. .... ... . ..:.deg/100ft..,de'g:.... :.. .. :..:.: .::.;. : 13565,00 40,39 0,31 9931,48 7849,62 -2975,20 8363,17 0,00 0,00 0,00 0,00 13575,00 41,95 359.79 9939,01 7856,20 -2975,19 8369,10 16,00 15,63 -5,20 -12,54 13595,00 45,09 358,84 9953,50 7869,97 -2975,36 8381.57 16,02 15,68 -4,75 -12,13 Section 2: Start "': .'MD 'Incl · Azim :: .:TvD; :."". +N/~S:..:,.. i+E/~w.' .... VS'::.. DLS' '.:.BUild "TUrn..... ...TFO" '...: ..... .... · ":" ~.ff.:'.." :':.deg':" .. deg'.... 'fi':': .'. ': '.i '..':.ft...:':~:::.. '.... ff .::..'.i ..'.fi'.' deg/100ff' deg/l:.00ff'deg/~100ff..'."';deg: . . .. · .. 13600,00 45,97 358,57 9957.00 7873,54 -2975,44 8384,82 18,00 17,58 -5,44 -12,54 13625,00 50,37 357.32 9973,68 7892,15 -2976.12 8401,89 17.99 17,60 -4,99 -12,35 BP Amoco { lanning Report- Geographic Company: BP Amoco Field: Endicott Site: End SDI Well: 3-25/M-27 Wellpath: Plan: 3-25NN-24 Date: 3/14/2001 Time: 17:07:42 Co-ordinate(NE) Reference: Well: 3-25/M-27, True North Vertical (TVD) Reference: 29: 25 1/6/1991 00:00 55.1 Section (VS) Reference: Well (0.00E,0.00N,334.29Azi) Plan: 3-25/N-24 Plan #9 Page: Section 2: Start MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO Section 3: Start MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg 13650,00 55.75 355,87 9988,70 7912,09 -2977,32 8420,37 22,00 21.51 -5,80 -12,61 13675,00 61,14 354,59 10001,78 7933,31 -2979,09 8440,26 22.00 21,57 -5,10 -11,74 13700,00 66,54 353.44 10012.80 7955,61 -2981,43 8461,37 22,00 21,61 -4,60 -11,07 13725,00 71,95 352,39 10021.65 7978,80 -2984,32 8483,52 22,00 21,64 -4,23 -10,56 13750,00 77,37 351,39 10028,27 8002,66 -2987,72 8506,49 22,00 21.66 -3.98 -10.19 13775.00 82,79 350,44 10032.57 8026,97 -2991,61 8530.08 22.00 21,68 -3,82 -9,92 13800,00 88,21 349,51 10034.53 8051,50 -2995,95 8554,07 22,00 21.68 -3,72 -9.76 13826,03 93,85 348,54 10034,06 8077,04 -3000.91 8579.23 21.99 21,68 -3,71 -9,70 Section 4: Start !!:!i! ii:i:!::iMD!:!;!~!ii!;i!~ii'ii! In'~ii!i!i?:i! · Azim · TVD.:' +N/,S: +E/,W ~S DLS .':BUild ~Turn /. TFO . . . ?;!i ff .deg' "n n "ff .ff deg/100ff deg/100ff deg/100ff .deg 13884,94 93.85 348,54 10030,10 8134,64 -3012,58 8636,18 0,00 0,00 0.00 0,00 Section 5: Start MD Incl Azim TVD .:+N/-S '+E/-W '':'VS DLS .' Build :.'Turn. 'TFO '"ft ""deg deg 'ff : ft :' · 'ff ft ... deg/100ft'deg/!00ft.deg!l.00ft, deg ..: ...................... . .. '. ": 13900,00 93,96 347,03 10029,07 8149,32 -3015,76 8650,79 10,00 0,75 -10.00 -85,65 13950,00 94,32 342,03 10025.46 8197,37 -3029,05 8699,85 10,00 0,71 -10,00 -85.75 14002,81 94,66 336,75 10021,33 8246,63 -3047,57 8752,27 10,00 0,65 -10.01 -86,08 Section 6: Start MD Incl' .. 'Azim TVD. +N/.s . +FJ-W .. VS DLS.' Build Turn. " TFO · .....ft deg deg.., ff... .. ft'. :" 'ft'~ : .:ft .deg/l:OOffdeg/lOOffdeg/!OOft .deg. .... 14100,00 94,66 336,75 10013.43 8335,63 -3085,81 8849,05 0.00 0,00 0,00 0,00 14200,00 94,66 336,75 10005,31 8427,21 -3125,15 8948,62 0,00 0,00 0,00 0,00 14300.00 94.66 336.75 9997,19 8518,78 -3164,50 9048,20 0,00 0,00 0,00 0,00 14400,00 94,66 336,75 9989,06 8610.36 -3203,84 9147.78 0,00 0,00 0,00 0,00 14425,84 94,66 336,75 9986,98 8634,02 -3214,02 9173,51 0,00 0.00 0.00 0,00 Section 7: Start :" MD ":Incl:" ":..AziTM TVD ':' +N/-S' .'. '~+E/-W" : VS · DLS".' BUild ' .Turn '.:: TFo " · . ...... . . . ..: :::". ft .:"..deg: ' deg.. '.:.. fi:'::' ::. ".:!.' .ft":.::..:' ::~ff: ' .... :"ft'. · :deg/!O0ft'.degil'00ft'.deg/i'0.0ft 'dOg'. ....::'...:.',:"..'. 14450,00 94,18 334,37 9985,12 8655,95 ,3223,98 9197,59 10,00 -1,98 -9,83 -101,30 14500,00 93,17 329,47 9981,91 8699.96 -3247,46 9247,43 10,00 -2,02 -9.81 -101,48 14550,00 92,14 324,57 9979,59 8741,84 -3274,65 9296,96 10,00 -2.07 -9,80 -101,80 14600,00 91,09 319,68 9978,18 8781,28 -3305,32 9345,80 10,00 -2,10 -9,78 -102,03 14650,00 90.04 314,79 9977,68 8817,97 ,3339,26 9393,59 10,00 -2,11 -9,77 -102,16 14698,99 89,00 310,00 9978,10 8850,99 -3375,44 9439.03 10,01 -2,12 -9,78 -102,22 Section 8: Start :::MD .: . .: .. In~!: ii: .. ~zim :/ TvD.. · .+N/~S"': ';:.;~e~iW ' ":': :VS ' :DLS::::.: :Build': Turn; TFO .. 'ft '. deg... · ...deg' .:..:...: .:. :ft' ..... ft · .. ft ... .ft: · deg/l:OOft:'deg/lOOft'deg/lOOft ·: deg '. ': 14700,00 88,96 309,91 9978,12 8851,64 -3376,21 9439,95 10,00 -3,59 -9,34 -111,02 14750,00 87,18 305,23 9979,80 8882,10 -3415,81 9484,58 10,00 -3,58 -9,34 -111,02 14800,00 85,41 300,55 9983,04 8909.19 -3457,69 9527,15 10,00 -3,54 -9,37 -110,86 14850,00 83,67 295,84 9987,80 8932,70 -3501,54 9567,36 10.00 -3,48 -9.42 -110,56 14900,00 81,97 291,10 9994,05 8952,45 -3547,03 9604,89 10,00 -3,39 -9,48 -110,11 14950,00 80,33 286,32 10001,75 8968,29 -3593,81 9639,46 10,00 -3,28 -9,56 -109,52 15000,00 78.76 281,49 10010.83 8980,11 -3641,52 9670,81 10,00 -3,15 -9,65 -108,78 15050,00 77,26 276,61 10021,22 8987,80 -3689,80 9698,69 10,00 -2.99 -9.76 -107,90 15055,31 77,11 276.09 10022,40 8988,38 -3694,94 9701,44 10,01 -2,85 -9,84 -106.61 BP Amoco {' /lanning Report - Geographic Company: BP Amoco Field: Endicott Site: End SDI Well: 3-25/M-27 Wellpath: Plan: 3-25A/N-24 Date: 3/14/2001 Time: 17:07:42 Co.ordinate(NE) Reference: Well: 3-25/M-27, True North Vertical (TVD) Reference: 29: 25 1/6/1991 00:00 55.1 Section (VS) Reference: Well (0.00E,0.00N,334.29Azi) Plan: 3-25/N-24 Plan #9 Page: Section 9: Start MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg 15100.00 77.11 276.09 10032.37 8993.00 -3738.26 9724.40 0.00 0.00 0.00 0.00 15200.00 77.11 276.09 10054.68 9003.34 -3835.19 9775.77 0.00 0.00 0.00 0.00 15300.00 77.11 276.09 10076.99 9013.69 -3932.12 9827.14 0.00 0.00 0.00 0.00 15400.00 77.11 276.09 10099.29 9024.03 -4029.05 9878.51 0.00 0.00 0.00 0.00 15500.00 77.11 276.09 10121.60 9034.37 -4125.98 9929.88 0.00 0.00 0.00 0.00 15600.00 77.11 276.09 10143.91 9044.71 -4222.91 9981.26 0.00 0.00 0.00 0.00 15700.00 77.11 276.09 10166.22 9055.05 -4319.84 10032.63 0.00 0.00 0.00 0.00 15744.17 77.11 276.09 10176.10 9059.65 -4362.65 10055.35 0.00 0.00 0.00 0.00 Survey MaP MaP : <;~',~ Latitude---;> <,~- LongitUde '-,> MD :: InCl nZiTM TVD i.: +N/-s -t-E/;W :N0rthing: Eating: i Deg Mia: sec~i: DegMin: Sec : 13565.00 40.39 0.31 9931.48 7849.62 -2975.20 5978914.72 267549.77 70 20 37.595 N 147 53 12.730W 13575.00 41.95 359.79 9939.01 7856.20 -2975.19 5978921.30 267549.98 70 20 37.660 N 147 53 12.730W 13595.00 45.09 358.84 9953.50 7869.97 -2975.36 5978935.07 267550.24 70 20 37.795 N 147 53 12.734W 13600.00 45.97 358.57 9957.00 7873.54 -2975.44 5978938.64 267550.27 70 20 37.830 N 147 53 12.737W 13625.00 50.37 357.32 9973.68 7892.15 -2976.12 5978957.26 267550.16 70 20 38.013 N 147 53 12.757W 13650.00 55.75 355.87 9988.70 7912.09 -2977.32 5978977.22 267549.57 70 20 38.209 N 147 53 12.792W 13675.00 61.14 354.59 10001.78 7933.31 -2979.09 5978998.49 267548.45 70 20 38.418 N 147 53 12.844W 13700.00 66.54 353.44 10012.80 7955.61 -2981.43 5979020.85 267546.79 70 20 38.637 N 147 53 12.913W 13725.00 71.95 352.39 10021.65 7978.80 -2984.32 5979044.12 267544.61 70 20 38.865 N 147 53 12.998W 13750.00 77.37 351.39 10028.27 8002.66 -2987.72 5979068.07 267541.94 70 20 39.100 N 147 53 13.097W 13775.00 82.79 350.44 10032.57 8026.97 -2991.61 5979092.49 267538.80 70 20 39.339 N 147 53 13.211 W 13800.00 88.21 349.51 10034.53 8051.50 -2995.95 5979117.14 267535.21 70 20 39.580 N 147 53 13.338W 13826.03 93.85 348.54 10034.06 8077.04 -3000.91 5979142.81 267531.04 70 20 39.831 N 147 53 13.483W 13884.94 93.85 348.54 10030.10 8134.64 -3012.58 5979200.74 267521.14 70 20 40.398 N 147 53 13.825W 13900.00 93.96 347.03 10029.07 8149.32 -3015.76 5979215.52 267518.41 70 20 40.542 N 147 53 13.918W 13950.00 94.32 342.03 10025.46 8197.37 -3029.05 5979263.95 267506.59 70 20 41.015 N 147 53 14.307W 14002.81 94.66 336.75 10021.33 8246.63 -3047.57 5979313.75 267489.59 70 20 41.499 N 147 53 14.849W 14100.00 94.66 336.75 10013.43 8335.63 -3085.81 5979403.87 267454.10 70 20 42.374 N 147 53 15.967W 14200.00 94.66 336.75 10005.31 8427.21 -3125.15 5979496.61 267417.58 70 20 43.275 N 147 53 17.118W 14300.00 94.66 336.75 9997.19 8518.78 -3164.50 5979589.34 267381.06 70 20 44.175 N 147 53 18.268W 14400.00 94.66 336.75 9989.06 8610.36 -3203.84 5979682.07 267344.54 70 20 45.076 N 147 53 19.419W 14425.84 94.66 336.75 9986.98 8634.02 -3214.02 5979706.03 267335.08 70 20 45.308 N 147 53 19.717W 14450.00 94.18 334.37 9985.12 8655.95 -3223.98 5979728.26 267325.80 70 20 45.524 N 147 53 20.008W 14500.00 93.17 329.47 9981.91 8699.96 -3247.46 5979772.96 267303.68 70 20 45.957 N 147 53 20.695W 14550.00 92.14 324.57 9979.59 8741.84 -3274.65 5979815.66 267277.79 70 20 46.368 N 147 53 21.489W 14600.00 91.09 319.68 9978.18 8781.28 -3305.32 5979856.01 267248.34 70 20 46.756 N 147 53 22.386W 14650.00 90.04 314.79 9977.68 8817.97 -3339.26 5979893.73 267215.54 70 20 47.117 N 147 53 23.378W 14698.99 89.00 310.00 9978.10 8850.99 -3375.44 5979927.83 267180.39 70 20 47.441 N 147 53 24.436W 14700.00 88.96 309.91 9978.12 8851.64 -3376.21 5979928.51 267179.63 70 20 47.448 N 147 53 24.459W 14750.00 87.18 305.23 9979.80 8882.10 -3415.81 5979960.16 267140.99 70 20 47.747 N 147 53 25.616W 14800.00 85.41 300.55 9983.04 8909.19 -3457.69 5979988.52 267099.96 70 20 48.013 N 147 53 26.840W 14850.00 83.67 295.84 9987.80 8932.70 -3501.54 5980013.36 267056.85 70 20 48.244 N 147 53 28.122W 14900.00 81.97 291.10 9994.05 8952.45 -3547.03 5980034.49 267011.99 70 20 48.438 N 147 53 29.451W 14950.00 80.33 286.32 10001.75 8968.29 -3593.81 5980051.76 266965.72 70 20 48.594 N 147 53 30.818W 15000.00 78.76 281.49 10010.83 8980.11 -3641.52 5980065.03 266918.39 70 20 48.710 N 147 53 32.213W 15050.00 77.26 276.61 10021.22 8987.80 -3689.80 5980074.20 266870.37 70 20 48.786 N 147 53 33.623W 15055.31 77.11 276.09 10022.40 8988.38 -3694.94 5980074.93 266865.26 70 20 48.791N 147 53 33.773W 15100.00 77.11 276.09 10032.37 8993.00 -3738.26 5980080.88 266822.10 70 20 48.836 N 147 53 35.039W 15200.00 77.11 276.09 10054.68 9003.34 -3835.19 5980094.18 266725.54 70 20 48.938 N 147 53 37.872W 15300.00 77.11 276.09 10076.99 9013.69 -3932.12 5980107.49 266628.97 70 20 49.039 N 147 53 40.704W 15400.00 77.11 276.09 10099.29 9024.03 -4029.05 5980120.79 266532.41 70 20 49.140 N 147 53 43.537W 15500.00 77.11 276.09 10121.60 9034.37 -4125.98 5980134.09 266435.84 70 20 49.241 N 147 53 46.369W BP Amoco ( 'lanning Report - Geographic Company: BP Amoco Field: Endicott Site: End SDI Well: 3-25/M-27 Wellpath: Plan: 3-25A/N-24 Date: 3/14/2001 Time: 17:07:42 Co-ordinate(NE) Reference: Well: 3-25/M-27, True North Vertical (TVD) Reference: 29: 25 1/6/1991 00:00 55.1 Section (VS) Reference: Well (0.00E,0.00N,334.29Azi) Plan: 3-25/N-24 Plan #9 Page: 4 Survey Map Map < ....Latitude ....> <--- Longitude ---> MD Incl Azim TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec ft deg deg ft ft ft ft ft 15600.00 77.11 276.09 10143.91 9044.71 -4222.91 5980147.40 266339.28 70 20 49.342 N 147 53 49.201 W 15700.00 77.11 276.09 10166.22 9055.05 -4319.84 5980160.70 266242.72 70 20 49.444 N 147 53 52.034 W 15744.17 77.11 276.09 10176.10 9059.65 -4362.65 5980166.60 266200.07 70 20 49.489 N 147 53 53.285 W H 181297 CHECK NO. VENDOR ALASKAO I LA O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT 100. O0 122100 PYMT HANDL CK122100R ;OMMENTS' Pee INST' S/H THE AI'rACHED CHECK IS IN PAYMENT FOR rrEMS DESCRIBED ABOVE. nit to drill - Sondra X4 Fee PAY RECEI\ MAR 16 2 Alaska Oil & Gas Cons, Anchorage ED Commission NET :,TO"/Th e. ,::'ALASKA OIL AND:?.'!i~AS?::-:. '-:.[.-:!!i ========================= : ORDER !'-ii. ": .~. 'i .: .:.... .. ' .' .-:' -.-:. ..::-- -. ":i :--. ':: ::: : -. -. -::' : - :-::::- "-: ~ -. .:.':::';.O'F .:~.v: ::- .-':: ':::333: -;NEST 7TH'":A~dENUE:?'::' SU I~-!:':-:':! O0 :;:'": "?:-::...-.-:":' :~:-::..: ::. :::7 ..... :::":..;"[::' '::'"?~?!~'::":' :;-.i!-:: i:::~':::i?'" ANCHORAGE AK ~501 412 100.00 No. H :,:.! 8::12'9.7 .... · : --:'...:: .! ':::.::"-::? ;'::..-:"- ..:'.-:i:::':: -.. CONSb'~iD~:D ~;6'MI~RCI,~:.:AccotJNT ;ii-i: .., q ~ , .~ n,,m ,ertl 1 3rl:lOO r'me r'II-I.CLI_L 1_1~111 CONSERVATION COPl~HSSION / TONY KNOWLES, GOVERNOR 333 Wl 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 JeffHupp Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Duck Island Unit/Endicott 3-25A/N-24 BP Exploration (Alaska) Inc. Permit No: 201-020 SurLoc' 2519'SNL, 759'WEL, Sec. 08, TllN, R17E, UM Btmhole Loc. 1262'NSL, 182'EWL, Sec. 32, T12N, R17E, UM Dear Mr. Hupp: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, ~ Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this ~ 0 ~ day of February, 2001 dlf/Enclosures cc: Department offish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. .f PERMIT TO DRILL 20 AAC 25.005 [] Exploratory r'l_Stratigraphic Test [] Development Oil la. Type of work [][] Re-EntryDrill [][] DeepenRedrill lb. Type of well [] Service [] Development Gas J~. Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 55.10' Endicott Field / Endicott Pool ;3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 O~?~'.~ADL312828 4. Location of well at surface 7. Unit offP?operty Name 11. Type Bond (See 20 AAC 25.025) 2519' SNL, 759' WEL, SEC. 08, T11 N, R17E, UM Duck Island Unit/Endicott At top of productive interval 8. Well Number 72' SNL, 1564' EWL, SEC. 05, T11N, R17E, UM 3-25A/N-24 Number 2S100302630-277 At total depth 9. Approximate spud date 1262' NSL, 182' EWL, SEC. 32, T12N, R17E, UM 03/15/01 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047502, 1262' MDI No Close Approach 4299.74 15752' MD / 10171' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 13500 MD Maximum Hole Angle 93.8 o Maximum surface 3711 psig, At total depth (TVD) 9900' / 4701 psig 18. Casing Program Specifications Setting Depth Size To3 Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2-7/8" 6.16# CR-13 ST-L 2612' 13140' 9563' 15752' 10171' 135 cu. ft. Class'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. - · v Present well condition summary JAN ] ~ Total depth: measured 14150 feet Plugs (measured) true vertical 10398 feet Alaska Oil& Gas Cons. Effective depth: truemeasuredvertical 1141080364 feetfeet Junk (measured) Anchorage Commission Casing Length Size Cemented MD TVD Structural Conductor 92' 30" Driven 131' 131' Surface 2409' 13-3/8" 2629 cu. ft. Permafrost 2448' 2383' Intermediate Production 13345' 9-5/8" 3448 cu. ft. Class 'G' 13384' 9805' Liner 1009' 7" 454 cu. ft. Class 'G' 13141' - 14150' 9619' - 10397' Perforation depth: measured Open: 13872' - 13892'; 13905'- 13925' Sqzd: 13732' - 13752'; 13790'- 13840'; 13852'- 13872' true vertical Open: 10171'- 10187'; 10198'- 10214' Sqzd: 10060' - 10076'; 10106'- 10146'; 10155'- 10171' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Jeff Hupp, 564-5344 Prepared By Name/Number: Sondra Stewman, 564-4750 21. I hereby certify that~e fo~go)ng is true and correct to the best of my knowledge t ! , Signed JeffHupp,~'~/,,~9~ Title Senior Drilling Engineer Date /,,J'////~//~ / : ..... ..... .... ~)"" : "" ':' 'oommi$$i'°nu$~OnlY"' "' ':"" ' '" : :' ,, ,, , ,,, , , ,, Permit Number I APl Number I A_pproval Date I See cover letter ~ /""(~'~ 50- 029-22125-01 ~, --- ~_.:~ o..~'1/ for other requirements Conditions of Approval: Samples Required [] Yes l~I'No Mud Log Required [] Yes J~ No Hydrogen Sulfide Measures /I~ Yes [] No Directional Survey Required ~ Yes [] No Required Working Pressure forE~OPE [] 2K [] 3K [] 4K ~K [] 10K [] 15K [] 3.5K psi for CTU Other: ORIGINAL SIGNED BY by order of Approved By D Taylor Seamount Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate BPX ~" Endicott M PI 3-25A/N-24Sidetrack Summary of Operations: MPI 3-25/M-27 production has declined. The sidetrack, 3-25/N-24, will kick off in the upper Kekiktuk and target the K2B. Planned TD will be 15752' MD, (10,171' TVD). This sidetrack will be conducted in two phases. Phase 1: Set Whipstock, Down squeeze cement, mill window. Planned for 2-/15/01 - 2J20/01. · E-Line will set the whipstock at approx. 13,500' · Service coil will down squeeze approx. 22 bbls cement to shut off existing perfs. Phase 2: Drill and Complete sidetrack: Planned for 3/15/01. Doyon Rig #15 will be used to mill the window, drill and complete the directional hole as per attached plan. The sidetrack will be completed with a cemented liner. The well will be sidetracked within the Kekiktuk Formation. Shown below are the interval tops within the Kekiktuk. Interval Tops M D TVD TVDss F1 Above KOP 9798.1 9743 K3A Above KOP 9825.1 9770 K2B 13638.35 9970.1 9915 K2M 13730.1 10010.1 9955 K2a/S2A3 13744.88 10015.1 9960 $2A1 15512.71 10091.1 10036 S1C 15752.06 10171 10116 Mud Program: · Phase 1: Seawater · Phase 2: Seawater and Solids Free Drilling Fluid (9.3-9.5 ppg) Disposal: · No annular injection on this well. · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 2 7/8", 6.16#, CR-13, ST-L cemented liner will be run from TD to approx. 13140' MD (9563'ss). Top of liner cement will be 200 ft above window &13300' MD. Approx. 24 bbls cement will be used for this liner cement job. Well Control: · BOP diagram is attached. · Pipe rams, blind rams tested to 300 psi and to 5000 psi. · The annular preventor will be tested to 300 psi and 3500 psi. Directional · See attached directional plan · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Close Approaches · No close approaches Logging · An MWD Gamma Ray log will be run over all of the open hole section. · A real time Resistivity or a Memory Induction Log will be run in open hole. Hazards · Production from MPI 3-25/M-27 has been measured 63 ppm H2S. (12/4/00) · Surface Offset well H2S readings o MPI 3-27:95 ppm (12/17/00) o MPI 3-29:98 ppm (11/24/00) o MPI 3-23:100 ppm (10/12/00 o MPI 3/21: Plugged w/cmt · Lost circulation risk is Iow. Reservoir Pressure Res. press, is estimated to be 4701 psi at 9900ss (9.1 ppg). Max. surface pressure with gas (0.10 psi/ft) to surface is 3711 psi. RECEivED JAN .l 9 2001 Alaska Oil & Gas Cons Anchorage' Commission TRE'E: 4-1/16" /5000 psi /McEvoy./ BakerActuator WELLHEAD: 13-5/8" /5000 psi M~ 'oy) · R.T. ELEV: 55.1' B.F. ELEV: 15.28' MAX. DEV. : 55:10 840 0' M.D. 13-8/8" 68#/ft, NT80CYHE BUTT CSG 12448, I 9-5/8" , 4 7#/ft NT80S XO to NT95HS 11396' RECEIVED SSSV LANDING NIPPLE OTIS (3.813" I.D.) W/SSSV IN MIN I.D. 2.0" 1434' 4-1/2", I 2.6 #Iff, I 3 CR, NSCT GLM's (Camco MMGM), (1-1/2" RK Latcl' No. TVD SS MD-BKB 7 3514' 39 32' 6 57 66' 73 65' 5 73 53' 99 58' 4 83 56' I I 480' 3 88 77' 12 208' 2 91 00' 12 538' I 91 79' 12 644' J/~N 1 9 2001 Alaska 0il & Gas Cons. Commission Anchorage TOP OF 7" TIWLINER 13141 ' 9-5/8", 47#/ft, NT95HS, NSCC I 13 384' I I 2-7/8" LINER TOP @ 13140' Existing perforations P&A'd during pre-rig operations PER FORATI NG SUMMARY Ref. Log: MWD-GR (2-10-91) SIZE SPF I NT ERVAL STAT US 4-1/2 4 13,732-13,752 Squ'd 4-1/2 4 13,790-13,840 Squ'd 4-1/2 4 13,852-13,883 Squ'd 3 3/8" 4 13,905'-13,91 5 Open 3 3/8" 4 13,915'-13,925 Open PBTD 114060, 7", 29#/ft, NT95 HS I T KC 14150' --, 4-1/2 .... SWS" NIPPLE (Parler) (3.81 3" ID) TIW R H Latch .' 9-5/8 x4 1/2" PACKER ;; TIW HBBP (4.00" I.D.') 13029' 13087' 13091' 4-1/2", 12.6#/ft 13 CR, TAILPIPE 4-1/2" SWS Nipple, Parlor I 13111' (3.813" ID) 4-1/2" SWN Nipple, Parlor I 13172 Milled to 3.80" ID 4-1/2" Wireline entry guide 13183 2-7/8" 6.4 ppf 13-CR STL @ TD I XXX XXX XXX XXX XXX XXX XXX XXX 3-3/4" hole drilled to 15.800' MD (+/-)' MARKER 13431 ' · ....'.. --~ SAND 13947' Date 2/12/91 3/28/91 10/2 9/93 12/21/00 Commen ts PROPOSED COMPLETION I NITIA L RWO CO M P L ET I O N PROPOSED TTRD ST ENDICOTT WELL: AP1N O.__EO -029-~212 5-01 PROPOSED 6OMPLE'EION DIAGRAM BP EXPLORATION (ALASKA), INC TREE: 4-1/16"/5000 psi/McEvoy/ Baler Actuator R.T. ELEV = 55.1 ' WELLHEAD: 13-5/8"/5000 psil~' '~_~oy) :t' B.F. ELEV =1 5.28' ~ 840 0' OTIS (3.813" I.D.) 13~3/8", 68#/ft, NT80 CYHE BUTT CSG W/SSSV IN MIN I.D. 2.0" I 2448' i i 4-1/2", I 2.6#/ft, I 3 eR, NSCT GEM's(Camco MMGM), (1-1/2" RE Latch) No. TVDSS M D-E~K B 7 3514' 39 32' 9-5/8", 4 7#/ft~ 6 57 66' 73 65' NT80S XO to NT95HS I I1 5 7353' 9958' 4 83 56' 11 480' I 11396' 3 8877' 12208' 2 91 00' 12 538' I 91 79' 12 644' (Parler) (3.81 3" ID) 9-5/8 x 4 112" PACKER TOP OF 7" mlW LINER TIW HBBP (4.00" I.D.) 13091 ' 9-5/8", 47#/It, NT95HS, Nsec I 13384' I ·. I · ,1~ 4-1/2" SWN Nipple, Parler 13172 (3.725" I D) I SIZE SPF INTERVAL ~TATU$ 4-1/2 4 13,7 32-13,7 52 SQ D 4-1/2 4 13,7 90-13,8 40 Squ'd 3 3/8 4 13905-1 3925 OPEN 3-3/8" 6 13 872'-13892' open Alaska Oil & Gas Cons. ~ ~P0mm..ss.0r~ I Anchorage MARKER 13431 ' PBTD [14060'I I Date By Comrnents EN[~ICOTr WELL: _~:25~ -27 2/12/91 PGS PROPOSED COMPLETION APl NO._50-029-22~ 3/28/91 JLH INITIAL eOM PLETI O]~L~J AGRAM 10/29/93 RSA RWO COMPLETION 3/14/98 DAV ADD PERF BP EXPLORATION (ALASKA), lNG I Dn'lIQuest Alaska State Plane 3 Alaska Drilling & Wells Endicott DI-SDI 3-25A/N-24 WPS Z 10000 - 10400 - 9000 - 8600 - 8200 -- '-.. 7800 - Scale: 1 inch = 400ft -4600 -4200 I I Eastings -3800 -3400 -3000 I I I 3-25A/N.24 WP 3-25A/N-24 TI (S2A t) End Dir, Sl~ff S~il @ 85.784°: 14789.25ftMD 3-25A/:.%"'-24 t7 (SZ,t3) Poittt Target Begin Dir @ 12.00°/100ft : 14269.04ft MD, End Dir, Staff Sail @ 93.838°: 13941.99ftMD Begin Dir @ 12.00°/100ft : 13500.00ft MD, I I I I 8200 8600 9000 9400 9800 10200 I -3400 Scale: 1 inch = 40Oft Section Azimuth: 334.285° (True North) Vertical Section ~Preparedby: ! Admin I -3000 Reference is True North - 9000 - 8600 - 8200 - 7800 '-.. 0 Date/Time: Checked: ~Approvod: 29 December, 2000 - 9:27 Sperry-Sun Drilling Services Proposal Data - 3-25A/N-24 WPS - 3-25A/N-24 WP ~.i :1394~;~99~:~`~3~`~;~99~:~93~8.4`~34~6~..'~65T~1~4~84~:~`.`; ~8~ 8199 35 · ~.,.,:";"'~='¥~'t-_:,_.__.:.,,,,.=._,~,_._~-~,,.,.,.,:.,.------_.,..,'""~"t"': ';"" .', .," ,, ,,',,,'..",~,'~,"~ ...,,',-.~,,~'.,~ . ::,,,',~",.:' ',,,'"~ ..~: ,, · "~:.. ... ":,~ ' ' ' '?i~ ~:~4~`~:~=~`.~.~.~`~;~¥~::~:?~`~!¥~:~:~.~:~s~:..~2z~.~ 8.s~.~.~,~ :~,~ i~:,;,',!,.' ........ ; ..... ,,.;,,~ ....... ., ,'.:..,. ......,..., ....... :. . , ...... ' ...... , ........ ... '-~;,~,t~,)'4.?.:89'"25:'.;, ,3..8,:,-5;?/',':',85.',"7.,8':'"284~,75.~003.7;53'". ',.:2'.4'3 88?0.59 ~':34'42.46 18 11.998 '254;'63.5 9485 '75' ;:~"r~,:,~', ~' : ": >.' ,:., ~?':':'.:'.,, ..,,~:, .;, ;.., . ', .' .. '.,' .'" .,' , ' ~. '., · '. ,,' " ,' .... , . .. · . ,. . ., . .... .. , ' ~IIi ~i.':!?:[5'~'60';;9~":?:'S~:~:'."~'`7,0':: "~5 ::.~'8.:':.':':28'A;:'75"~OO'~9'?:~$~'. .' ','42 :'.0'3' 9o3.'.5. :?.~ ;..:~:,. . .,.... ,,, .. . ........ 29 December, 2000 - 13:39 - I - DrillQuest Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS Revised: 28 December, 2000 Alaska State Plane 3 Measured Depth (ft) 13500.00 Incl. 42.656 Azim. 1.661 Sub-Sea Vertical Local Coordinates Depth Depth Northings Eastings (~) (~) (fi) (~) 9827.90 9883.00 7805.55 N 2978.03W 13600.00 54.505 359.135 9893.94 9949.04 13700.00 65.917 354.843 9943.56 9998.66 13800.00 77.428 351.264 9974.96 10030.06 13900.00 88.983 347.997 9986.77 10041.87 13941.99 93.838 346.647 9985.74 10040.84 Global Coordinates Northings Eastings fit) (ft) 5978871.06 N 267545.43 E 7880.40 N 2977.66W 5978945.86 N 267548.09 E 7966.88 N 2982.39W 5979032.44 N 267546.00 E 8060.92 N 2993.95W 5979126.80 N 267537.33 E 8158.41N 3011.82W 5979224.79 N 267522.45 E 14000.00 93.838 346.647 9981.85 10036.95 14100.00 93.838 346.647 9975.16 10030.26 14200.00 93.838 346.647 9968.47 10023.57 14269.04 93.838 348.647 9963.85 10018.95 8199.35 N 3021.03W 5979265.99 N 267514.49 E 14300.00 93.443 342.946 9961.88 10016.98 14400.00 92.078 331.009 9957.05 10012.15 14500.00 90.624 319.094 9954.68 10009.78 14600.00 89.142 307.186 9954.89 10009.99 14700.00 87.698 295.268 9957.65 10012.75 14750.68 87.000 289.220 9960.00 10015.10 14789.25 85.784 284.746 9962.43 10017.53 8255.67 N 3034.40W 5979322.69 N 267502.86 E 8352.75 N 3057.44W 5979420.43 N 267482.80 E 8449.83 N 3080.48W 5979518.17 N 267462.74 E 8516.85 N 3096.39W 5979585.65 N 267448.89 E 8546.66 N 3104.50W 5979615.69 N 267441.70 E 8638.42 N 3143.49W 5979708.60 N 267405.53 E 8720.21 N 3200.66W 5979792.10 N 267350.89 E 8788.46 N 3273.49W 5979862.55 N 267280.18 E 8840.19 N 3358.81W 5979916.87 N 267196.48 E 14800.00 85.784 284.746 9963.22 10018.32 14900.00 85.784 284.746 9970.57 10025.67 15000.00 85.784 284.746 9977.92 10033.02 8859.35 N 3405.65W 5979937.45 N 267150.26 E 8870.59 N 3442.46W 5979949.81N 267113.81E 29 December, 2000 - 9:39 8873.32 N 3452.82W 8898.70 N 3549.27W 8924.09 N 3645.71W Page I of 3 5979952.86 N 267103.53 E 5979981.18 N 267007.91 E 5980009.51 N 266912.29 E RECEIVED JAN 1 9 ?_001 Alaska Oil & Gas Cons. Commission Anchorage Dogleg Rate (°/lOOft) 12.oo 12.oo 12.oo 12.oo 12.00 0.00 0.00 0.00 0.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 0.00 0.00 0.00 Alaska Drilling & Wells Endicott DI-SDI Vertical Section Comment 8324.67 8391.94 8471.92 8561.66 8657.25 8698.13 8754.67 8852.13 8949.60 9016.88 9047.26 9146.85 9245.34 9338.44 9422.07 9459.65 9485.75 9492.70 9557.42 9622.14 Begin Dir @ 12.00°/100ft 13500.00ft MD, 9883.00ft TVD End Dir, Start Sail @ 93.838° . 13941.99ftM D,10040.84ftTV D Begin Dir @ 12.00°/100fl 14269.04ft MD, 10018.95ft TVD End Dir, Start Sail @ 85.784° . 14789.25ftMD,10017.53ftTV D DrillQuest 2,00,06 Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS Revised: 28 December, 2000 Alaska State Plane 3 Alaska Drilling & Wells Endicott DI-SDI Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 15100.00 85.784 284.746 9985.27 10040.37 8949.47 N 3742~16W 15200.00 85.784 284.746 9992.62 10047.72 8974.86 N 3838,60W 15300.00 85.784 284.746 9999.97 10055.07 9000.24 N 3935.05W 15360.95 85.784 284.746 10004.45 10059.55 9015.71N 3993.83W 15400.00 81.745 282.356 10008.70 10063.80 9024.81 N 4031.56W 15500.00 71.486 275.947 10031.84 10086.94 9040.37 N 4127.40W 15509.71 70.500 275.290 10035.00 10090.10 9041.27 N 4136.54W 15600.00 70.500 275.290 10065.14 10120.24 9049.11N 4221.29W 15700.00 70.500 275.290 10098.52 10153.62 9057.80 N 4315.15W 15752.36 70.500 275.290 10116.00 10171.10 9062.35 N 4364.29W Global Coordinates Northings Eastings (ft) (ft) 5980037.83 N 266816.67 E 5980066.16 N 266721.04 E 5980094.48 N 266625.42 E 5980111.75 N 266567.14 E 5980121.99 N 266529.71E 5980140.48 N 266434.39 E 5980141.65 N 266425.28 E 5980152.09 N 266340.81E 5980163.65 N 266247.26 E 5980169.70 N 266198.28 E Dogleg Rate (°/100ft) Vertical Section Comment 0.00 9686.85 0.00 9751.57 0.00 9816.29 0.00 9855.73 12.00 9880.30 12.00 9935.90 12.00 9940.67 0.00 9984.52 0.00 10033.07 0.00 10058.50 Begin Dir @ 12.00°/100ft 15360.95ft MD, 10059.55ft TVD End Dir, Start Sail @ 70.500° . 15509.71ftMD,10090.10ftTV D Total Depth ' 15752.36ft M D, 10171.10ft'rv D All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.395° (28-Dec-00) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well and calculated along an Azimuth of 334.285° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15752.36ft., The Bottom Hole Displacement is 10058.50ft., in the Direction of 334.285° (True). 29 December, 2000 - 9:39 Page 2 of 3 DrillQuest 2.00.06 Alaska State Plane 3 Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS Revised: 28 December, 2000 Alaska Drilling & Wells Endicott DI-SDI Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 13500.00 9883.00 7805.55 N 2978.03 W 13941.99 10040.84 8199.35 N 3021.03 W 14269.04 10018.95 8516.85 N 3096.39 W 14789.25 10017.53 8870.59 N 3442.46 W 15360.95 10059.55 9015.71 N 3993.83 W 15509.71 10090.10 9041.27 N 4136.54 W 15752.36 10171.10 9062.35 N 4364.29 W Comment Begin Dir @ 12.00°/100ft : 13500.00ft MD, 9883.00ft TVD End Dir, Start Sail @ 93.838°: 13941.99ftMD,10040.84ftTVD Begin Dir @ 12.00°/100ft : 14269.04ft MD, 10018.95ft TVD End Dir, Start Sail @ 85.784°: 14789.25ftMD,10017.53ftTVD Begin Dir @ 12.00°/100ft : 15360.95ft MD, 10059.55ft TVD End Dir, Start Sail @ 70.500° · 15509.71ftMD,10090.10ftTVD Total Depth · 15752.36ftMD,10171.1 0ftTVD Targets associated with this wellpath Target Name 3-25A/N-24 T1 (K-l) 3-25A/N-24 T1 (S2A1) 3-25NN-24 T1 (S2A3) Mean Sea Level/Global Coordinates: Geographical Coordinates: Mean Sea Level/Global Coordinates: Geogr. aphical Coordinates: Mean Sea Level/Global Coordinates: Geographical Coordinates: Target Entry Coordinates TVD Northings Eastings (ft) (ft) (ft) 1O171.10 10116.00 10090.10 10035.00 10015.10 9960.00 Target Target Shape Type 9061.64 N 4364.55 W Point 5980169.00 N 266198.00 E 70° 20' 49.3937" N 147° 53' 53.3522" W 9040.60 N 4136.80 W Point 5980141.00 N 266425.00 E 70° 20' 49.1881" N 147° 53' 46.6967" W 8858.89 N 3405.89 W Point 5979937.00 N 267150.00 E 70° 20' 47.4045" N 147° 53' 25.3366" W 29 December, 2000 - 9:39 Page 3 of 3 DriliQuest 2.00,06 Sperry-Sun Anticollision Report Company: BP Amoco Date: 12/29/2000 Time: 13:37:40 page!i:::i: :: 1 Field: Endicott ;:: ::';:: ~: Reference Site: End SDI Co-ordinate(NE) Reference: Well: 3-25/M-27, True North : Reference Well: 3-25/M-27 Vertical (TVD) Reference: 29' 25 1/6/1991 00:00 55.1 ReferenceWellpath: 3-25A/N-24 TrRD Plan#1 Dbi oracle · . . NO GI,OBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 100.0000 ft Error Model: ISCWSA Ellipse Depth Range: 13500.0000 to 15752.5271 ft Scan Method: Tray Cylinder North Maximum Radios:1615.2090 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 11/15/2000 Validated: No Version: 2 Planned From To Survey Toolcode Tool Name 52.650013200.0000 I: Schlumberger GOT multishot GCT-MS Schlumberger GCT multishot 3500.000015752.3600 Planned: 3-25/N-24 Plan #5 V1 MWD MWD - Standard Casing Points ~i~i:ii:i:::i::iiii::~.~ :..,~.~-~ete~ :!: i:HOieiSi~i:! iil.:: :.:ii ::ilNameil ~'i :!il : i:::: ::ii::~i ~: : i~ i ~: Summary .... :.:.. ' ' i .. · .' ":.': Z .. · · ' '.: ' ..": ' '.'..:' . · .... ".: .'i..~i.". .. .:. · '.' .... :" '.'.' . "Z'.' .:." ........... ' '. ....... ~ i. . Zi' ' ... .' .... ' '" ' ' ' · · '.' :' ' :'~ · i<-~,?'-.'~'~?~7.~:?i~?~? Offse~:~eHpath'..~;,i~,~,~??,~-~:> %.'i .: .:....:.:....'.'. '? :'.i. Reference.- FOffseti...'...Ctr;Ctr:' No,Go ..' Allowable:. !' '..'... . ' i~ : i Site· .. i.:::i.?.':i .'.i'.' · ."ii'~elY .::.i:.' "'i .' .'.?:i'ii i.':i~::::':::.:i/':.Welipath.::.i.:.."i::?.':":!':. ?"..'i.'ii...:'..i.....ii~:.":.':.!'..:::i.i iMD ': .i.Distance Ar~ · .Deviation'..". 'Warning End MPI 1-29/M-25 1-29/M-25 V1 15656.132413500.0000 882.5109 No Reference Casings End MPl 1-33/M-23 1-33/M-23 V1 End MPI 1-33A/N-24 1-33A/N-24 V3 End MPI 1-33A/PB1 1-33A/PB1 V3 End MPI 1-33B/L-24 1-33B/L-24 V2 End MPI 1-65/N-25 1-65/N-25 V1 End MPI 1-65/N25PH 1-65/N25PH V] ~ 3569.9778~ 3414.00001520.6949345.6740~ 183.9039 Pass: Major Risk End SDI 3-07/N-28 3-07/N-28 V1 End SDI 3-07A/L-29 3-07/VL-29 V5 Out of range End SDI 3-09/L-26 3-09/L-25 V1 13512.178814700.00001052.7464415.4826 634.8617 Pass: Major Risk End SDI 3-25/M-27 3-25/M-27 V1 13500.009~3500.0000 0.4176 No Reference Casings End SDI 4-06/P-27 4-03/P-27 V1 End SDI 4-10/M-28 4-10/M-25 V1 ~3694.207513600.00001351.6274392.7653 96~.1779 Pass: Major Risk Site: End MPI Well: 1-29/M-25 Rule Assigned: Major Risk Wellpath: 1-29/M-25 V1 Inter-Site Error: 0.0000 ft Ii · · ... .Ref~re~?: 'i '::: ;i.: ii: i. : .. ' " .'. ': offset :.:": "i .... ..'semi~Maj°r:~s'' ...v. '..'i.'': i'i ~... .i .... .". Ctr-Ctr'·No-Go· ·Allowable··" : ~ :'":::'.: M!~'ii..:i.':ill''''!...~': ':":ii' i.'i"ilIMD:''I: i~ ':.'''TVD:': ':.i'~:'iRef .:....i ~et:/· TFO+AZI .TFO-HS'.casing:: 'iDi~tance" area.' .'i .Deviation':. wa~: i i : · .":'."..lift :::~. ~":::'?":.:::'...:ft/:.' :' .':" ':"':. itl...' ii'...i ?~":ff.::.il ...i-ft.':":::.: .... :.ffl. i..'".. 'deg. :..'deg'.: '.i'in '.... .... i...I ..ft' .... i.. fti. ". ' ft': .... : 5693.225ffl0151.304913300.0000 9775.1090 43.7026 57.6391 212.161 296.671 882.7333 FAIL 5673.396710144.685813400.0000 9854.$044 43.5455 53.2939 205.7~7 290.497 877.9233 No Reference Casings 5656.1324~0135.922913500.0000 9936.3150 43.4087 56.7186 199.379 284.069 852.5109 No Reference Casings 5639.116510133.2429~ 3600.0000~ 00~ 8.1813 43.2740 59. ~ 379 193.102 277.812 897.2283 No Reference Casings 5622.422110127.670213700.000010100.4946 43.1417 59.5603 187.076 271.786 921.4207 No Reference Casings 1~ 5606.5252~ 0122.363713800.000010183.6803 43.0158 59.9815 181.373 266.083 953.7635 No Reference Casings I'ri © ITl m Sperry-Sun Anticollision Report Db: Oracle Site: End MPI Well: 1-65/N25PH Wellpath: 1-65/N25PH Vl Rule Assigned: Major Risk Inter-Site Error: 0.0000 ft Ctr-Ctr. ::N~G~i:Allowab~ : i :,: Site: End SDI Well: 3-09/L-28 Rule Assigned: Major Risk Wellpath: 3-09/[.-28 V1 Inter-Site Error: 0.0000 ft 9914.096414300.0000 9871.1565 9959.465214400.0000 9908.8899 9990.813414500.0000 9941.6653 6.944714600.0000 9966.3134 9984.2342 114800.0000 9995.8646 869 5000.000010009.5077 ~.00001 0015.9724 300010023.5465 5400.000010043.7267 8671 5700.00001 0080.9288 1.352515800.000010093.8083 )11.352515800.60001 0093.8856 61.3240 56.6873 87.228 86.779 61.3252 57.8642 84.914 86.625 61.7670 59.1244 82.544 86.945 62.2964 60.4251 80.158 87.144 62.7639 61.6707 78.138 87.257 63.1958 62.8574 76.314 87.483 63.5950 63.9312 74.617 87.936 63.7682 65.1006 75.326 88.645 63.9722 66.2611 76.027 89.346 64.2106 67.3825 76.772 90.091 1052.5210398.0115 655.8282 1047.8442401.2822 645.7417 1047.1634407.4382 639.4897 1048.8458413.3922 635.7507 1052.7464418.4826 634.8617 1059.0693423.1443 636.6159 1070.7011427.2228 643.9617 1082.8636431.1736 651.9540 1093.5914435,2055 658.4875 1102.5041 64.5251 68.1790 74.880 90.741 1113.6297 64,7568 68.4826 71.305 91.327 1131.6977 64.7529 68.7911 68.983 91.990 1155.9062 64.6149 68.9004 66.627 92.617 1184.6089 64.3425 68.8431 64.223 93.195 1221.8353 63.9365 68.5863 61.757 93.709 1264.2621 63.9365 68.5931 61.761 93.713 1264.5317 Pass Pass Pass Pass Pass Pass Pass Pass Pass No Reference Casings No Reference Casings No Reference Casings No Reference Casings No Reference Casings No Reference Casings No Reference Casings No Reference Casings Site: End SDI Well: 3-25/M-27 Rule Assigned: NOERRORS Wellpath: 3-25/M-27 V1 Inter-Site Error: 0.0000 ft 9883.216~3500.0000 9882.9935 0.0000 61.7927 39.845 38.165 9948.146~3600.0000 9958.2738 -0.1687 62.0803 176.441 177.262 9993.338~3700.000010035.5949 0.4268 63.1872 172.871 177.501 3113.7418 1.0053 64.2582 168.809 176.222 5829 1.4731 65.1714 165.582 175.125 1.7800 65.9195 163.389 174.402 90.000010357.0337 2.0130 66.6155 161.604 173.826 0.4178 FAIL 12.4873 No Reference Casings 46.8957 No Reference Casings 97.5688 No Reference Casings 161.9619 No Reference Casings 236.1476 No Reference Casings 316.7460 No Reference Casings Z m WELL DETAILS Name +N/-S +E/-W NotthingEasling LatitudeI~ngltude Slot 3-25/M-27 1595.7580-1998.0075 5970978.0311 270283.201t 70=19'20.400N 147:51'45~,08W 25 ANTI-COLLISION SETTINGS Interpolation Method:MD Interval: 100.0000 Dep~ Range From: 13500.0(100To: 15752.3591 Maximum Range: 10000.0(R)(~eference: Plan: 3-25/N-24 Plan #5 COMPANY DETAILS BP Amoco Etmr S)'stem: ISCWSA Scan Method: Tmv Cylinder No~h Eh'or Surfac~: Elliptical + C,~sing W~mfing [,tel:hod: Rules Bas~ SURVEY PROGRAM Depth Fm Depth To Survey/plan Ttn,I 13500.000015752.3591 Planned: 3-25/N-24 Plan #5 VI BLINI) --1496 --1400 --1200 --4OO --200 --0 --200 --400 --1200 --1400 --1496 · -"' .- --:~ ........ ..-...: ......... . _.-.....~ ....ill :: -4 :-'-=4.: .=, ~ .. /.:). . ~/-:~:::...- ::7- '/;/.:i/7 :: t :' :' ..' ."///: ~.:..:-~.(-/...-'/-~.:.~:' ;; //~7::--////>~-/~ .- .... ''' iff ...... ...... -=:.--7.~[[~7~ ........ ..... "';,.7;--.[ '-.... From Colour To MD 0 5O0 500 1000 1000 2000 2000 ~ 3000 3000 5000 5000 ~' : 7500 7500 10000 10000 12500 12500 15000 15000 50000 180' -19.2 -15.0 -10.0 -5.0 -1~70 -5.0 -10.0 -15.0 -19.2 From Colour To MD 0 500 500 1000 1000 2000 2000 3000 3000 5000 5000 7500 75OO 1000O 10000 12500 12500 15000 0 15000 ....... 50000 ;'//~ ....... ~ .... . .... ..,,'..."..' \'..':':. 90 ~. i~..~.-:\',.". '-;:"&".' ' ~.'~:, .... :':.: ' "/':'." .'/. · 80 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [ 1 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [600fffin] WI'].I. PATH DI :'rAll,~; 3.25A/N.24 TI'RI) I'lan$1 'anmt W¢llpalk 3-25~t-27 IhlRig:urn: I)~yon 15 29: 25 I/6/l~l 00:00 55.11KI0fl V.Secti.n (h/gin (}fi,fin Staxfing Angl~ +N/-S+[:J-W[:tl,m TVD LF.13 I'h'q I ) ~ 3.07/N-28(3-07/N.28). MajorRi~k ~ 3.07,ndI~29 (.'L07A/I..29), Ma~r Rkk ~ 3-09/I.-28 (3-(19/L-28). Ma~r Risk 3-25/M-2713-25/M-27). NOERRORS 4- IO/M-28 (4- IO/M-28). Major Risk 3- 25A/N.24 'rFRI) Plan~ I ~25/N-24 Plan #5 SECTION DETAILS Sec MD Inc A2i '['VD+NAS +E/-WL.~ TFace VScc Targct I13500.{~{X) 42.656 1.676 9882.9962 7~063440 -2976.1176 0.000 0.0~0 8353.2327 13600.0000 54305 359.135 9949.0410 7881.1868 -2975.7398 12.000 -10.000 842_'4.4759 3 13941.9925 93.838 346.647 10040.8389 8200.1461 -3OI9.1147 12.0~0 -19.183 8738.14~5 14269.0412 93,838 346.647 10018.9478 8517.6398 -_'~94.4760 0.0LO 0.000 9062.3327 14750~87.000 289220 10015.1000 8,~O.1400 -3403.7328 12.000 -95.983 9489.6591 3-2_5/qN-24Tl(S2A3cntt'/} 614789.2455 85.784 284.746 10017.5280 8871.3798 -.~03323 12.000-105.365 9512.7559 7153~0.9521 85.784 284.746 IO)593563 9OI6.5036 -3991.9134 0.000 0.000 9836.9278 815509_7106 70300 275.290 10090.1000 9042.0555 -4134.6188 12.000-149.656 9909.5372 3-2_5A/N-24T2(S'2Al 157523591 70300 275.290 10171.1000 9063.1558 ~362-3732 0.000 O.0D0 10006.9159 3-25A/N-24T3(K-ITargct) Plan: 3-25/1'4-24 Plan #5 (3-25/'M- 27/3-25 A/N- 7.4 TI'RD ~ C'rcaic,J By: I~Wayt~ Pratt I)al~: 12/'29/20 Lfl~Jl~: , ..... R¢','iewed: Dale: -- 3-1/e' · 2-~/I~'~PT. 2-1/16' ilNt~L-- 2-1/16' HCR 2e' 3--3/~' 1'o- O' 7-1/4' 3/1S' 2-1/4' 3~ 7 1/16" BOP STACK ARRANGEMENT - RAM 3-i/8' 134' ~ SIK)OL 7-t/16' · 4--I/16' XO SPOOL 7-1/16' TEST SPOOL ~GN=T. R.),N~E l ," i I . . . I BOP ST~K E~ATION 21 !/4' ~ ~l [ ~L '1 J] 8/A', 13 5/8', ~ ~, 14~ ~, 1/¢ ~ ~ ~ V~ 1/6' ~ 5~', ~ ~. 10' ~ ~, ! 12" 150 ~ HYT~. Oi~R,~TEZ) KNFE GATE Z' FI.G'O VE)~T UNE; SURFACE DIVE:RTER CONFIGURATION RIG 15 7 1/16"' BOP STACK ARRAN(;}t~4ENT (5M) Ii~ ic~o l~ i~ ~ I Ol/O9/99 I .PR I Lr~ BPX ~ Endicott M PI 3-25A/N-24Sidetrack Summary of Operations: MPI 3-25/M-27 production has declined. The sidetrack, 3-25/N-24, will kick off in the upper Kekiktuk and target the K2B. Planned TD will be 15752' MD, (10,171' TVD). This sidetrack will be conducted in two phases. Phase 1: Set Whipstock, Down squeeze cement, mill window. Planned for 2-/15/01 - 2/20/01. · E-Line will set the whipstock at approx. 13,500' · Service coil will down squeeze approx. 22 bbls cement to shut off existing perfs. Phase 2: Drill and Complete sidetrack: Planned for 3/15/01. Doyon Rig #15 will be used to mill the window, drill and complete the directional hole as per attached plan. The sidetrack will be completed with a cemented liner. The well will be sidetracked within the Kekiktuk Formation. Shown below are the interval tops within the Kekiktuk. Interval Tops MD TVD F1 Above KOP 9798.1 K3A Above KOP 9825.1 K2B 13638.35 9970.1 K2M 13730.1 10010.1 K2a/S2A3 13744.88 10015.1 S2A1 15512.71 10091.1 S1C 15752.06 10171 TVDss 9743 9770 9915 9955 9960 10O36 10116 Mud Program: · Phase 1' Seawater · Phase 2: Seawater and Solids Free Drilling Fluid (9.3-9.5 ppg) ~as~ L~ .. Disposal: · No annular injection on this well. · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 2 7/8", 6.16~, CR-13, ST-L cemented liner will be run from TD to approx. 13140' MD (9563'ss}. Top of liner cement will be 200 ft above window &13300' MD. Approx. 24 bbls cement will be used for this liner cement job. Well Control: · BOP diagram is a~ached. · Pipe rams, blind rams tested to 300 psi and to 5000 psi. · The annular preventor will be tested to 300 psi and 3500 psi. Directional · See a~ached directional plan · Magnetic and inclination suweys will be taken eve~ 30 ft. No gyro will be run. Close Approaches · No close approaches Logging · An MWD Gamma Ray log will be run over all of the open hole section. · A real time Resistivity or a Memo~ Induction Log will be run in open hole. Hazards · Production from MPI 3-25/M-27 has been measured 63 ppm H2S. (1~4/00) · Sudace Offset well H2S readings o MPI 3-27:95 ppm (12/17/00) o MPI 3-29:98 ppm (11/24/00) o MPI 3-23:100 ppm (10/12/00 o MPI 3/21: Plugged w/cmt · Lost circulation risk is Iow. Rese~oir Pressure Res. press, is estimated to be 4701 psi at 9900ss (9.1 ppg). Max. sudace pressure with gas (0.10 psi/ft) to sudace is 3711 psi. TREE: 4-1/16" /5000 psi /McEvoy/ Baker Actuator WELLHEAD- 13-5/8" / 5000 psi=.l~ 'voy) I R.T. E LEV = 55.1' B.F. ELEV = 15.28' MAX. DEV. = 55:10 840 0' M.D. 13-,3/8" 68#/ft, NT80 CYHE BUTT CSG SSSV LANDING NIPPLE I I OTIS (3.813" I.D.) W/SSSV I N M IN I.D. 2.0" 1434' 2448' 9-5/8", 4 7#/ft NT80S XO to Nm95 HS I 11396' I JAN .l 9 ~001 Alaska Oil & Gas Co~s. Commission Anchorage TOP OF 7" TIWLINER I13141 ' 9-5/8" , 4 7#/ft, NT95 HS, N SCC I 13384' I 2-7/8" LINER TOP @ 13140' Existing perforations P&A'd during pre-rig operations PERFORATING SUMMARY Ref. Log: MWD-GR (2-10-91) SIZE SPFI INTERVAL STAT U,.c 4-1/2 4 13,732-13,752 Squ'd 4-1/2 4 13,790-13,840 Squ'd 4-1/2 4 13,852-13,883 Squ'd 3 3/8" 4 13,905'-13,91 5 Open 3 3/8" 4 13,915'-13,925 Open PBT D 7", 29#/ft, NT95 HS TKC XXX 4-1/2", I 2.6 #/fi:, I 3 CR, NSCT GLIVfs (Camco MMGM)~ (1-1/2" RK Latcl' No. TVD SS MD-BK B 7 3514' 39 32' 6 57 66' 73 65' 5 73 53' 99 58' 4 83 56' I I 480' 3 88 77' 12 208' 2 91 00' 12538' 1 91 79' 12644' --, 4-1/2 .... SWS" NIPPLE 13029' (Parter) (3.81 3" ID) TIW R H Latch 13087' .. 9-5/8 x 4 1/2" PACKER ;: TIW HBBP (4.00" I.D.') 13091' 4-1/2", I 2.6#/ft I 3 CR, TAILPIPE 4-1/2" SWS Nipple, Parlor I 13111 (3.813" ID) 4-1/2" SWN Nipple, Parlor 13172 Milled to 3.80" ID 4-1/2" Wireline entry I 13183 gu id e 2-7/8" 6.4 ppf 13-CR STL @ TD XXXX XXX XXX XXX XXX 13-3/4" hole drilled to 15.800' MD (+/-)' X X X 13431' SAN D I 13 947 ~ Date 2/12/91 BV PGS 3/28/91 JL H 10/29/93 RSA RWO COMPLETION 12/21/00 PROPOSED TTRD ST JLH III Commen ts PRO POSED COMP LETION INITIAL ENDICOTI' WELL: 3-25A/N-24 APl NQ. 50-029-22125-01 PROPOSED COMPEL'LION DIAGRAM I I BP EXPLORATION (ALASKA), INC I TREE: 4-1/16"/5000 psi /M cE voy / Baker Actuator R.T. ELEV = 55.1' WELLHEAD: 13-5/8" / 5000 psi J~"' -Evoy) ~. B.F. ELEV = I 528' .......~ MAX. DEV. = 55:10 840 0' Q ______ SSSV LANDING NIPPLE OTIS (3.813" I.D.) 13-3/8'; 68#/f't, NT80 CYHE BUTT CSG W/SSSV IN MIN I.D. 2.0" ! 4-1/2", I 2.6#/ft, I 3 CR, NSCT GEM's(Camco MMGM), (1-1/2" RK Latch) No. TVDSS M D-BKB ~ 7 3514' 3932' 9-5/8", 47#/ft~' i 6 5766' 7365' NT80S XO to NT95HS ~"~r-- ; 5 7353' 9958' I : 4 8356' 11 480' 11 396' -- -- 3 88 77' 12 208' 2 91 00' 12538' I 91 79' 12 644' 13029' (Parler) (3.81 3" ID) ~ mlW RH Latch 13O87' ~7 9-5/8 x 4 112" PACKER TOP OF TIW LINER TIW HBBP (4.00" I.D.) 13091 ' 9-5/8", 47#/ft, NT95"S, NSCC I~ · ·__~ 4-1/2" ,,SWS Nipple, Parter · · · 4-1/2" SWN Nipple, Parfer 13172 ~ (3.725" I D) I PERFORAltNG SUMMARY / ~' 4-1/2" Wireline entry guide I 13183 Ref. Log: MWD-GR (2-10-91) WLEGELMD 13189' SIZE SPF INTERVAL STATUS 17' 4-1,2 4 13,732-13,752 SQD RECEiVeD 4-1/2 4 13,7 90-13,8 40 Sq u'd 4-1/2 4 13,852-13,883 Squ'd 3 3/8 4 13 905 -1 392 5 OPE N 3-3/8" 6 13872'--13892' open J4N 1.9 2001 Alaska 0il & Gas Cons. Anchorage Com~iSsion ~ MARKER 113431' PBTD 114060.1 7", 2 9#/ft, Nm95 HS Date By Comrnents ENDICO'R' WELL: 2/12/91 PCS PROPOSED COMPLETION APl NO..50-029-22125 3/28/9 1 JLH INITIAL COMPLETION DIAGRAM 10/2 9/93 RSA RWO COMPLETION , 3/14/98 DAV ADD PERF BP EXPLORATION (ALASKA), INC No. TVDSS M D-BKB 7 3514' 39 32' 6 57 66' 73 65' 5 73 53' 99 58' 4 8356' 11 480' 3 88 77' 12 208' 2 91 00' 12538' I 91 79' 12 644' I DrillQuest' Alaska State Plane 3 Alaska Drilling & Wells Endicott DI-SDI 3-25A/N-24 WPS 9000 - ~ 10000 - >.[ 510400 -- Scale: linch = 400ft Eastings -4600 -4200 -3800 -3400 -3000 I I I I I . O010~tl'xlO o 3-2SAWN- ~4 TI (K-h .~.~ ~O _~ ~ ~o,~ ~ .n 59 55~ ....... ,.~. ~.._~ ~0 · I~O~/~[~t~ct -=~52-36~0'1u . ~ 70 5~*: 1~u ~5360.gS~D' 3-25~-24 ~ 3-25A/N-24 TI (S2A1) t'oint Ta~et End Dir, StaA Sail ~ 85.7~°: 14789.25flMD, 3-25A/N-24 7'1 (52A3 Pohtt Target Begin Dir O 12.00°/100ft : 14269.04ft MD, End Dir, Start Sail {} 93.838°: 13941.99ftMD Begin DIr {~ 12.000/100ft : 13500.00ft MD, ~-- .,-- ~ . ~35~- ' -4600 -4200 -3800 . · . *l~0 · ~ ..... ~,~, ~.~,.~ ~.~o~,~,, _._ x, 3-25A/N-24 TI (S2A.3) ', Pt)iht ~ .............. ~ ,Xo~at Der' ' "~'"~ Point ' ~ Point I I I I 8200 8600 9000 9400 9800 10200 I I -3400 -3000 Reference is True North Scale: linch = 400ft Section Azimuth: 334.285° (True North) Vertical Section [Prepared by: ! Admin r)ate/Time: Checked: 29 December, 2000 - 9:27 IApproved: - 9000 - 8600 - 8200 0 0 II 0~ - 7800 .~ Sperry-Sun Drilling Services Proposal Data - 3-254/N-24 WPS - 3-254/N-24 WP p;~...~,~.i..~.,~c../;~,~.~.,.~.,~::=L~.~'~ :~ .'(ft)'~[ ':'~="~;':~'"' ~?:':"~'"'~ '~ ;:'' 1~ I"~o'/~n~l ' = . 'l (c33~)'' !.~[~1"'~%~.... ........ ~' ........ ..... "~.~ .... .,.' '~,,.: .~ ..... ...... t.,,'. ' ..... "42.66~; ..... 1.66I~ 9883.00 ~ ' ....... ~"'; ',. 7805.55F"'~+ ,. ,. ::~..N ?;':":~ ~ ~":2978.03 ~''W~ ' ~' ~ ~ 1~:~~ .,. ~ :' ~'8324'' /::'67 '3'4!~99": 93.84 346'.65 10040.84 .. 91.80 8199.35 N 3021.03 W '[.''' 340.817 8698.13 · "~.84 346;65 10018.95' -21.'89 8516.85 N 3096.39 W 0.000 0.000 9'016.88 87.05 2..9.22 1.3S15.'C. -3.85 8.~59.35 N 347;_:.55 W '.2."'20 254.017 9459.65 "~'J:i .57'.:,85;78 284.75 10017.53 2.43 8870.59 N 3442.46 W ''.~:-,' 254.635 9485.75 ~7'~"'i:"85.78 284'75"10059,55 ' 42.03 90X5.71 N 39,93.83 W 0.000 0.000 9855.73 [55'09~71:< 70.5~ 275.29 1C'.399.!0 30.54 904' .27 N 4!36.5~ W '2.:.~0 210.344 9940.67 1~752.35 i... 242,65l.- 7:3...L~..?..!_.. ~.! ~..:..~..?. l.~)32 I:_~3 ~ '~: 81~ 00{~ 6~:..~_.~i 43~ 4~3:~2:~j ...... .9:.0.P_9_ .......~.:.~ ~.gJ [o o 5 8.5 o] 29 December, 2000- 13:39 - I - DrillQuest Alaska State Plane 3 ~. Measured Sub-Sea Depth Incl. Azim. Depth (ft) (ft) 13500.00 42.656 1.661 9827.90 Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS Revised: 28 December, 2000 Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 9883.00 7805.55 N 2978.03 W 13600.00 54.505 359.135 9893.94 9949.04 13700.00 65.917 354.843 9943.56 9998.66 13800.00 77.428 351.264 9974.96 10030.06 13900.00 88.983 347,997 9986.77 10041.87 13941.99 93,838 346.647 9985.74 10040.84 14000.00 93.838 346.647 9981.85 10036.95 14100.00 93.838 346.647 9975.16 10030.26 14200.00 93.838 346.647 9968.47 10023.57 14269.04 93.838 346.647 9963.85 10018.95 14300.00 93.443 342.946 9961.88 10016.98 14400.00 92.078 331.009 9957.05 10012.15 14500.00 90.624 319.094 9954.68 10009.78 14600.00 89.142 307.186 9954.89 10009.99 14700.00 87.698 295.268 9957.65 10012.75 14750.68 87.000 289.220 9960.00 10015.10 14789.25 85.784 284.746 9962.43 10017.53 14800.00 85.784 284.746 9963.22 10018.32 14900.00 85.784 284.746 9970.57 10025.67 15000.00 85.784 284.746 9977.92 10033.02 Global Coordinates Northings Eastings (ft) (ft) 5978871.06 N 267545.43 E 7880.40 N 2977.66W 5978945.86 N 267548.09 E 7966.88 N 2982.39W 5979032.44N 267546.00 E 8060.92 N 2993.95W 5979126.80 N 267537.33 E 8158.41 N 3011.82W 5979224.79 N 267522.45 E 8199.35 N 3021.03W 5979265.99 N 267514.49 E 8255.67 N 3034.40W 5979322.69 N 267502.86 E 8352.75 N 3057.44W 5979420.43N 267482.80 E 8449.83 N 3080.48W 5979518.17 N 267462.74 E 8516.85 N 3096.39W 5979585.65 N 267448.89 E 8546.66 N 3104.50W 5979615.69 N 267441.70 E 8638.42 N 3143.49W 5979708.60 N 267405.53 E 8720.21N 3200.66W 5979792.10 N 267350.89 E 8788.46 N 3273.49W 5979862.55 N 267280.18 E 8840.19 N 3358.81W 5979916.87 N 267196.48 E 8859.35 N 3405.65W 5979937.45 N 267150.26 E 8870.59 N 3442.46W 5979949.81 N 267113.81 E 8873.32 N 3452.82W 5979952.86 N 267103.53 E 8898.70 N 3549.27W 5979981.18 N 267007.91 E 8924.09 N 3645.71W 5980009.51 N 266912.29 E Dogleg Rate (°/lOOft) 12.00 12.00 12.00 12.00 12.00 0.00 0.00 0.00 0.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 0.00 0.00 0.00 Alaska Drilling & Wells Endicott DI-SDI Vertical Section Comment 8324.67 8391,94 8471.92 8561,66 8657,25 8698.13 8754.67 8852,13 8949,60 9016.88 9047,26 9146,85 9245.34 9338,44 9422.07 9459.65 9485.75 9492.70 9557.42 9622.14 Begin Dir @ 12.00°/100ft 13500.00ft MD, 9883.00ft TVD End Dir, Start Sail @ 93.838 : 13941.99ftM D,10040.84ftTV D Begin Dir @ 12.00°/100ft : 14269.04ft MD, 10018.95ft TVD End Dir, Start Sail @ 85.784° : 14789.25ftM D, 10017.53ftTV D 29 December, 2000 - 9:39 Page 1 of 3 DrillQuest 2o00.06 Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS Revised: 28 December, 2000 Alaska State Plane 3 Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 15100.00 85.784 284.746 9985.27 10040.37 8949.47 N 3742~16 W 15200.00 85.784 284.746 9992.62 10047.72 8974.86 N 3838.60 W 15300.00 85.784 284.746 9999.97 10055.07 9000.24 N 3935.05 W 15360.95 85.784 284.746 10004.45 10059.55 9015.71 N 3993.83 W Global Coordinates Northings Eastings (ft) (ft) 5980037.83 N 266816.67 E 5980066.16 N 266721.04 E 5980094.48 N 266625.42 E 5980111.75 N 266567.14 E 15400.00 81.745 282.356 10008.70 10063.80 9024.81N 4031.56W 15500.00 71.486 275.947 10031.84 10086.94 9040.37 N 4127.40W 15509.71 70.500 275.290 10035.00 10090.10 9041.27 N 4136.54W 5980121.99 N 266529.71E 5980140.48 N 266434.39 E 5980141.65 N 266425.28 E 15600.00 70.500 275.290 10065.14 10120.24 9049.11 N 4221.29W 15700.00 70.500 275.290 10098.52 10153.62 9057.80 N 4315.15W 15752.36 70.500 275.290 10116.00 10171.10 9062.35 N 4364.29W 5980152.09 N 266340.81E 5980163.65 N 266247.26 E 5980169.70 N 266198.28 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.395° (28-Dec-00) The Dogleg Severity is in Degrees per 100 feet. Vertical Section is from Well and calculated along an Azimuth of 334.285° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 15752.36ft., The Bottom Hole Displacement is 10058.50ft., in the Direction of 334.285° (True). Dogleg Rate (°/100fi) 0.00 0.00 0.00 0.00 12.00 12.00 12.00 0.00 0.00 0.00 Alaska Drilling & Wells Endicott DI-SDI Vertical Section Comment 9686.85 9751.57 9816.29 9855.73 9880.30 9935.90 9940.67 9984.52 10033.07 10058.50 Begin Dir @ 12.00°/100ft · 15360.95ft MD, 10059.55ft TVD End Dir, Start Sail @ 70.500 . 15509.71 ftMD,10090.10ftTV D Total Depth: 15752.36ftM D, 10171.10ftTV D 29 December, 2000.9:39 Page 2 of 3 DrillQuest 2.00.06 Sperry-Sun Drilling Services Proposal Report for 3-25A/N-24 WPS Revised: 28 December, 2000 Alaska State Plane 3 Alaska Drilling & Wells Endicott DI-SDI Comments Measured Station Coordinates Depth TVD Northings Eastings (ft) (ft) (ft) (ft) 13500.00 9883.00 7805.55 N 2978.03 W 13941.99 10040.84 8199.35 N 3021.03 W 14269.04 10018.95 8516.85 N 3096.39 W 14789.25 10017.53 8870.59 N 3442.46 W 15360.95 10059.55 9015.71 N 3993.83 W 15509.71 10090.10 9041.27 N 4136.54 W 15752.36 10171.10 9062.35 N 4364.29 W Comment Begin Dir @ 12.00°/100ft : 13500.00ft MD, 9883.00ft TVD End Dir, Start Sail @ 93.838°: 13941.99ftMD,10040.84ftTVD Begin Dir @ 12.00°/100ft : 14269.04ft MD, 10018.95ftTVD End Dir, Start Sail @ 85.784°: 14789.25ftMD,10017.53ftTVD Begin Dir @ 12.00°/100ft : 15360.95ft MD, 10059.55ft TVD End Dir, Start Sail @ 70.500° · 15509.71ftMD,10090.10ftTVD Total Depth ' 15752.36ftMD,10171.10ftTVD Targets associated with this wellpath Target Name 3-2SA/N-24 T1 (K-l) 3-25A/N-24 T1 (S2A1) 3-25A/N-24 T1 (S2A3) Mean Sea Level/Global Coordinates: Geographical Coordinates: Mean Sea Level/Global Coordinates: Geographical Coordinates: ean Sea Level/Global Coordinates: Geographical Coordinates: Target TVD (ft) 10171.10 10116.00 10090.10 10035.00 10015.10 9960.00 Entry Coordinates Northings Eastings (ft) (ft) Target Target Shape Type 9061.64 N 4364.55 W Point 5980169.00 N 266198.00 E 70° 20' 49.3937" N 147° 53' 53.3522" W 9040.60 N 4136.80 W Point 5980141.00 N 266425.00 E 70° 20' 49.1881" N 147° 53' 46.6967" W 8858.89 N 3405.89 W Point 5979937.00 N 267150.00 E 70° 20' 47.4045" N 147° 53' 25.3366" W 29 December, 2000 - 9:39 Page 3 of 3 DrillQuest 2.00.06 Sperry-Sun Anficollision Report Reference Vertical (']'VI)) Reference: NO GLOBAL SCAN: Using user defined selection & scan criteria Reference: Principal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 100.0{300 ft Error Model: {SCWSA Ellipse Depth Range: 13500.0000 to 15752.5271 ft Scan Method: Tray Cylinder North Maximum Radlus:1615.2090 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 11/15/2000 Validated: No Version: 2 Planned From To Survey Toolcode Tool Name 52.650013200.0000 1: Schlumberger GOT multishot GCT-MS Schlumberger GOT multishot Planned: 3-25/N-24 Plan #5 V1 MWD MWD - Standard Casing Points Sununary i:Sit~ili!: :: :::; ~:::! ::i ::: :;~!: ;': .............. ' ...... ' End MPI 1-2g/M-25 1-2g/M-25 V1 15658.132413500.0000 882.5109 No Reference Oasings End MPI 1-33/M-23 1-33/M-23 V1 End MPI 1-33A/N-24 1-33A/N-24 V3 End MPI 1-33A/PB1 1-33A/PB1 V3 End MPI 1-33B/L-24 1-33B/L-24 V2 End MPI 1-65/N-25 1-65/N-25 V1 End MPI 1-65/N25PH 1-65/N25PH V1 End SDI 3-07/N-28 3-07/N-28 V1 End SDI 3-07A/L-29 3-07,4/I,-29 V5 End SDI 3-09/L-28 3-09/L-28 V1 End SDI 3-25/M-27 3-25/M-27 V1 End SDI 4-08/P-27 4-08/P-27 V1 End SDI 4-10/M-28 4-10/M-28 V1 13569.977813414.00001520.6949345.67401183.9039 13812.178814700.00001052.7464418.4826 634.8617 13500.009213500.0000 0.4178 13694.207513600.00001351.8274392.7653 961.1779 Pass: Major Risk Out of range Pass: Major Risk No Reference Casings Pass: Major Risk Site: End MPI Well: 1-29/M-25 Rule Assi~ed: Major Risk Wellpath: 1-29/M-25 Vl Inter-Site Error: 0.0000 9775.1090 43.7026 57.8391 212.161 296.871 3400.0000 9854.8044 43.5455 58.2939 205.787 290.497 9936.3150 43.4087 58.7186 199.379 284.089 3600.0(X)010018.1813 43.2740 59.1379 193.102 277.812 )127.670213700.000010100.4946 43.1417 59.5603 187.076 271.786 !.363713800.000010183.6803 43.0158 59.9818 181.373 266.083 t1.Rog.qlo117.RR4RIR.q{'x3.000010PR7.gfipR 4~..qOP4 RO.4OIR 17R.0~7 PC-~3.727 882.7333 FAIL 877.9283 No Reference Casings 882.5109 No Reference Casings 897.2283 No Reference Casings 921.4207 No Reference Casings 953.7635 No Reference Casings .q.qP.gRRg No R~,fnmnc,~ ~,,n,~inn.~ m © IT! ITt Sperry-Sun Anticollision Report Site: End MPI Well: 1-65/N25PH Rule ,4~signed: Major Risk Wellpath: 1-65/N25PH V1 Inter-Site Error: 0.0000 Site: End SDI Well: 3-09/L-28 Rule Assigned: Major Risk Wellpath: 3-09/L-28 V1 Inter-Site Error: 0.0000 9914.096414300.0000 9871.1565 61.3240 56.6873 87.228 86.779 9959.465214400.0000 9908.8899 61.3252 57.8642 84.914 86.625 9990.813414500.0000 9941.6653 61.7670 59.1244 82.544 86.945 9956.3134 62.2964 60.4251 80.158 87.144 9934.2342 62.7639 61.6707 78.138 87.257 114800.0000 9995.8646 63.1958 62.8574 76.314 87.483 0003.1869 63.5950 63.9312 74.617 87.936 63.7682 65.1006 75.326 88.645 524915100.000010015.9724 63.9722 66.2611 76.027 89.346 64.2106 67.3825 76.772 90.091 9147 )015.608:315400.000010043.7267 ;)14.3176155(X).000010055.7039 )013.176015600.000010068.0778 )012.186715700.000010080.9288 )011.352Sl 5800.000010093.8083 352615800.600010093.8856 1052.5210398.0115 655.8282 1047.8442401.2822 645.7417 1047.1634407.4382 639.4697 1046.8458413.3922 635.7507 1052.7464418.4826 634.8617 1059.0693423.1443 636.6159 1070.7011427.2228 643.9617 1082.8636431.1736 651.9540 1093.5914435.2055 658.4675 1102.5041 64.5251 68.1790 74.880 90.741 1113.6297 64.7568 68.4826 71.305 91.327 1131.6977 64.7529 68.7911 68.963 91.990 1155.9062 64.6149 68.9004 68.627 92.617 1184.6089 64.3425 68.6431 64.223 93.195 1221.8353 63.9365 68.5663 61.757 93.709 1264.2621 63.9365 68.5931 61.761 93.713 1264.5317 Pass Pass Pass Pass Pass Pass Pass Pass Pass No Reference Casings No Reference Casings No Reference Casings No Reference Casings No Reference Casings No Reference Casings No Reference Casings No Reference Casings Site: End SDI Well: 3-25/M-27 Rule Assigned: NOERRORS Wellpath: 3-25/M-27 V1 Inter-Site Error: 0.0000 ft 9683.216013500.00009882.9935 0.00(30 61.7927 39.846 38.165 9946.146913600.0000 9958.2738 -0.1687 62.0803 176.441 177.262 9993.338213700.000010035.5949 0.4268 63.1872 172.871 177.501 3800.0(X)010113.7418 1.0053 64.2582 168.809 176.222 )75613900.000010193.5829 1.4731 65.1714 165.582 175.125 9387 1.7800 65.9195 163.389 174.402 .125314100.000010357.0337 2.0130 66.6155 161.604 173.826 0.4178 FAIL 12.4873 No Reference Casings 46,8957 NO Reference Casings 97.5688 No Reference Casings 161.9619 No Reference Casings -. 236.1476 No Reference Casings 316.7460 No Reference Casings m WIlL DETAILS +NbS 15~5.7500 -1~5 --1496 --1400 --4OO --200 ~0 --200 --4OO --1200 --1400 --1496 ANTI-COLLISION ~tfl'lmlGS Interpolation Method'.MD Interval: 100.0000 ~ RangeFtom: 13500.0000To: 15752.3591 Maximum Range: 10000.000(3Reference: Plan: 3-25/N-24 Plan #5 COMPANY DETAILS Caktda6~n Me*l~d: M~um Cu~vatm~ East Syslela: I~A ~: T~v ~ ~ ~: ~+C~g W~gM~ R~ SURVEY P~OGRAM De~hFm Dq~To Su~T/Plan T~n,I 13500.000015752.3591 Plante, ck 3-25/N-24 Plan ~ VI BIJND Fa'om Colour To MD From Colour To MD 0 500 0 500 500 ' 1000 500 1000 1000 2000 lO00 2000 2000 ~ 3000 2000 3000 0 3ooo 5oo0 30o0 - 50o0 5000 7500 5000 7500 "~ ........ -- .... 7500 I0000 7500 I0000 : ......... i.-i.~ ........ 10000 12500 10000 ...... 12500 / ' '- '--"-- '?- i:ii .......... ..i' :-.2~i~ ii i[71.-,- .-~ :~:~: -. ~ Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [ 1 180 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [600ft/in] DRAFT COPY ONLY ~ 3-25R/N-24 'ITRD P~a~l Plan: ."LlS/N-24 Plan #5 ( ~2~/'M-lT/3-25A/N-24 TrRD y: D~Wayne Prell Dale: 12/~.r20~ : Date: Reviewed: Dale: SECTION DETAILS Sec MD IncAzi 'rVD +bUS +E/.WDLe8'ITao0VSec Tatg~ 11 135~O.0GOD 42.656 1.676 9982.9962 78~.3440 -2976.1176 0.000 0.0~0 8353.2.127 13600.0000 54.505 359.135 g949.0410 7881.1868 -2975.'/398 12.000 -10.GO0 8423.4759 3 1~941.9925 93338 346.647 10040.g399 8200.1461 -3019.1147 12.G~0 -19.1~3 873&1485 4 14269.0412 93.838 346.647 1(]018.9478 8517.6.19g -3094.4760 0.000 0.00090623327 14750.6808 87.000 289.220 10015.1~0 8~60.14GO -3403.T32~ 12.000 -95,983 9489fi591 3-25A/N-24TI (S2A3~nuy} 14789.2455 85.784 284.746 IGOI732gO 8871..T/9~ -34403~23 12,000 -105.365 9512.7559 ? 15360.9521 gS.?g4 284.746 IGO59.5563 9016.5036 -3991,9134 0.0~0 0J~0 9836.9278 15509.71G6 70300 275.290 10090.1000 cA)42.0555 -4134.61P~1 12.000-149.656 9909,5372 .'t.25A/N-24T2{S2AI 157523591 70.500 275.290 10171.1GO0 9063.15;58 -4.'162.37.12 0.000 0.000 100~.9159 3-25A/N-24T3{K-ITsrg~} 3-1,/~,' , 2-1/le' ~1' .!-1/4' Il' · $' o' 0' 7-1/4' 2' 2-1/4' 2' 1-1/4o 7 1/16' BOP STACK ARRANGEMENT (5M) /16' IdANt. LAL 7-1/IS' x 4-1/16' xo SPOOl. 7-1/16' ~ s~cx. N)Nq'. FI.AHCI~ IVBIHO SPOOL ! ~' ~o 3/4' -- 13, '~/8', 5~O PSI. IQ' Idl:',. C)t~TQ~ inI~£ ptpE RMI ~ BOTTOId/SrU00~ 5/8', 5000 Ps1, 14"'ldl~ GI~A.~Q~, I/6' SOOO PSI GAI~ -- 13 5/8', 5004) I~, ! . - 21 I/4.' 2~ Pi) Ft. ANG[ 21 I/,I.' 2O00 i:~. ~ I~L B0e/DM~E:R ' STUlX)~ TOe~ KTT04,4 ! 12' 15Q p4~ HYOR. C)4:)ERATTr. D - Kt,IFE GATE VAL~ ' 12' FLG'D ~ I.J~E SURFACE DIVERTER CONRGUEATION ii"-~ .,~ ~5 '11m~ 7 1/16' BOP STACK '~ ARRNqOE~ENT DATE I C.ECK NO. I H .1. 8 0 9 G 3 ~2"2s"°°1 I °°18°9631 VENDOR ALASKAO I LA . O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET l~iO0 CKi~lOOC 100. O0 100.. O0 PYMT COMMENTS: Per nit To Drill --ee HANDL£NQ INST: S/H - Terrie Hub)le X46~8 IE ATrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. OO. OO OO I ,.:,.'::,': ';:!:;':,:;,,...::,;i' 'CEEVELAND, OF~iO ]'.,; :', :" I t 412 3 i:i. :: PAY ONE , ::!:<:., .. ,:',"ALASI~A OIL ~:,:iC oN's:~R V A T I oN!? :.c~M~!~:T :,;33~ ]~EST 7TH"~.?~E~uE:'::;' ~lJIi~E;;i:i:''1 O0 ANCHORAGE AK 99501 :,i!JS:: DOLLAR .':;:,:,')AMOUNT NQ,.T:::¥ALID AFTER 120 DAYS mi j,Ii .... ' ; m; ~i ..,.,.. WELL PERMIT CHECKLIST COMPANY WELL NAME PROGRAM: exp __ dev __ redrll __ serv __ wellbore seg __ann. disposal para req __ FIELD & POOL INIT CLASS GEOL AREA UNIT# ON/OFF SHORE ADMINISTRATION APPR DATE 1. Permit fee attached ....................... Y N 2. Lease number appropriate ................... Y N 3. Unique well name and number .................. Y N 4. Well located in a defined pool .................. Y N 5. Well located proper distance from drilling unit boundary .... Y N 6. Well located proper distance from other wells .......... Y N 7. Sufficient acreage available in drilling unit ............ Y N 8. If deviated, is wellbore plat included ............... Y N 9. Operator only affected party ................... Y N 10. Operator has appropriate bond in force ............. Y N 11. Permit can be issued without conservation order ........ Y N 12. Permit can be issued without administrative approval ...... Y N 13. Can permit be approved before 15-day wait ........... Y N ENGINEERING DATE GEOLOGY APPR DATE 14. Conductor string provided ................... Y 15. Surface casing protects all known USDWs ........... Y 16. CMT vol adequate to circulate on conductor & surf csg ..... Y 17. CMT vol adequate to tie-in long string to surf csg ........ ~ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ........ _.~.,_,. ..... 26. BOPE press rating appropriate; test to ~;O~ .psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N 31. Data presented on potential overpressure zones ....... Y N 32. Seismic analysis of shallow gas zones ............. Y N 33. Seabed condition survey (if off-shore) ............. Y N 34. Contact name/phone for weekly progress reports [exploratory only] Y N ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular TEM ~ ~/~0 COMMISSION: JMH' ~ * ~ It 4 i.,.., l~ i0h Commentsllnstrucfions: I§ I§ c:\msoffice\wordian\diana\checklist (rev. 11/01//00) WELL PERMIT CHECKLIST FIELD & POOL COMPANY rY~''.~ ' WELL NAME'-~--Z'~'£~PROGRAM: exp INIT~'~-I.~SS ~J::::~- ~/ /'~O/4L._ GEOL AREA Lease number appropdate-~4. ~ ~.~-. ,':ue/,d';:~ .~-:~/./~ :- '.~./.. Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from ddlling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available, in ddlling unit ............ If deviated, is wellbore plat included ............. . . Operator only affected party ................... ADMINISTRATION 1. Permit fee attached ....................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can. be issued without administrative approval ...... Can permit be approved before 15-day wait ........... Conductor string provided ................... Surface casing p~otects all known USDWs ........... CMT vol adequate to circulate on conductor & surf csg ..... CMT v01 adequate to tie-in long string to surf csg ........ CMT will cover all known productive hodzons ..... ..... Casing designs adequate for C, T, B & permafrost ....... Adequate tankage or reserve pit ................. If a re-drill, has a 10-403 for abandonment been approved... Adequate wellbore separation proposed ........ ..... If diverter required, does it meet regulations .......... Drilling .fluid program schematic & equip list adequate ..... BOPEs, do they meet regulation ................ BOPE press rating appropriate; test to ~'-~ psig. Choke manifold complies w/APl RP-53 (May 84) ........ . 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. A~ DATE I-2'z.,-o / )N N dev "/ redrll / serv wellbore seg ann. disposal para req ENGINEERING 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 27. 28. 20. GEOLOGY 30. 31. 32. ;~R DATE . 33. I-2~.~/ 34. ON/OFF SHORE ~'Z Work will occur without operation shutdown ........... N ..... ' ~ .. ~ , Is presence of H2S gas probable ................. Y Permit can be issued wlo hydrogen sulfide measures ..... y ~__~'~ Data presented on potential overpressure zones ....... Y..~N ,~,~ ,/~" "' ,'/-~-~'-.~'~--' .-'~--~~' ~ ~ ?,/,,~=,r.,. ~--~-~z.,j. Seismic analysis of shallow gas zones ............. Seabed condition survey (if off-shore) .......... :,--'"../,.) i~ ,~Y-Ny N .- . ~ ~ , v d ' Contact name/phone for weekly progress reports [explefatory only] Y N ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ....... Y N APPR DATE (B) will not contaminate freshwater; or cause ddlling waste... Y N to surface; (C) will not impair mechanical integrity of the well uSed for disposal; Y· N (D) will not damage producing formation or impair recovery from a Y N pool; and (E). will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING:· UlC/~nular COMMISSION: Comments/Instructions: O Z O (/3 rtl c:\msoffice\wordian\diana\checklist (rev. 111011/00) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No 'special'effort has been made to chronologically organize this category of information. 3-25A N-24.tapx Sperry-Sun Drilling Services LIS Scan Utility SRevision: 3 $ LisLib SRevision: 4 $ Tue Aug 28 15:01:54 2001 Reel Header Service name ............. LISTPE Date ..................... 01/08/28 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 01/08/28 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Endicott MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: 3-25A N-24 -- 500292212501 BP Exploration (Alaska), Inc. Sperry Sun 28-AUG-01 MWD RUN 2 MWD RUN 3 AK-MM-10097 AK-MM-10097 R. FRENCH R. KRELL E. VAUGHN C. GALLOWAY 8 lin 17E 2519 759 ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 55.10 GROUND LEVEL: 14.20 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 7.000 13571.0 ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 1. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. Page 1 3. 3-25A N-24.tapx MWD RUN 2 IS DIRECTIONAL WITH DU~L GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. MWD RUN 3 IS DIRECTIONAL WITH DGR, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN), AND STABILIZED LITHO-DENSITY (SLD). 5. MWD RUN 4 MADE NO FOOTAGE AND IS NOT PRESENTED. 6. DEPTH CORRECTION/SHIFTING OF MWD DATA IS WAIVED PER THE E-MAIL FROM D. SCHNORR FOR B.P. EXPLORATION (ALASKA), INC ON 08/02/01. MWD DATA IS CONSIDERED PDC. THIS WELL KICKS OFF FROM 3-25/M-27 AT 13571'MD, 9936'TVD. 7. MWD RUNS 1-3 REPRESENT WELL 3-25A/N-24 WITH API#: 50-029-22125-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14428'MD, 9983'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. TNPS = SMOOTHED COMPENSATED THERMAL NEUTRON POROSITY (SS MATRIX, FIXED HOLE SI CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 6.0" MUD WEIGHT: 9.6 PPG MUD SALINITY: 1100 PPM CHLORIDES FORMATION WATER SALINITY: 16000 PPM CHLORIDES FLUID DENSITY: 1.0 G/CC MATRIX DENSITY: 2.65 G/CC LITHOLOGY: SANDSTONE $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/08/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Page 2 3-25A N-24.tapx Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMPLARY PBU TOOL CODE START GR 13529 ROP 13590 NCNT 13713 FCNT 13713 NPHI 13713 DRHO 13723 RHOB 13723 PEF 13723 FET 13755 RPD 13755 RPM 13755 RPS 13755 RPX 13755 $ BASELINE CURVE FOR SHIFTS: DEPTH 0 0 0 0 0 0 0 .0 .5 .5 .5 .5 .5 CURVE SHIFT DATA (MEASURED DEPTH) STOP DEPTH 14368.0 14428.0 14331.0 14331.0 14331.0 14347.0 14347.0 14347 0 14375 0 14375 0 14375 0 14375 0 14375 0 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 2 13529.0 MWD 3 13815.0 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 13815.0 14428.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 NPHI MWD PU-S 4 1 68 32 9 FCNT MWD CNTS 4 1 68 36 10 NCNT MWD CNTS 4 1 68 40 11 RHOB MWD G/CM 4 1 68 44 12 DRHO MWD G/CM 4 1 68 48 13 PEF MWD B/E 4 1 68 52 14 Name Service Unit Min Max Mean Nsam DEPT FT 13529 14428 13978.5 1799 ROP MWD FT/H 0 557.77 32.9128 1677 Page 3 First Reading 13529 13590 Last Reading 14428 14428 GR MWD API 6.94 172.09 RPX MWD OHMM 4.49 260.23 RPS MWD OHMM 4.67 547.78 RPM MWD OHMM 4.22 1980.06 RPD MWD OHMM 5.22 1981.92 FET MWD HOUR 1.49 108.07 NPHI MWD PU-S 8.48 29 FCNT MWD CNTS 456.3 2030.8 NCNT MWD CNTS 25122.5 44455.5 RHOB MWD G/CM 2.072 2.441 DRHO MWD G/CM -0.03 0.147 PEF MWD B/E 1.83 5.3 First Reading For Entire File .......... 13529 Last Reading For Entire File ........... 14428 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/08/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 3-25A N-24.tapx 23.5032 1679 153.202 1240 276.676 1240 518.8 1240 693.201 1240 13.8542 1240 17.3172 1237 1060.7 1237 34729.1 1237 2.237 1249 0.0284836 1249 3.16909 1249 13529 13755.5 13755.5 13755.5 13755.5 13755.5 13713 13713 13713 13723 13723 13723 14368 14375 14375 14375 14375 14375 14331 14331 14331 14347 14347 14347 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/08/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13529.0 13753.5 ROP 13590.0 13815.0 $ LOG HEADER DATA DATE LOGGED: 04-APR-01 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 65.44 DATA TYPE (MEMORY OR REAL-TIME): Memory TD DRILLER (FT): 13815.0 TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: 42.0 MAXIMUM ANGLE: 75.6 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR DUAL GAMMA RAY PB01874GVR4 $ BOREHOLE AND CASING DATA Page 4 OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 3-25A N-24.tapx ~.000 13571.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.70 MUD VISCOSITY (S): 44.0 MUD PH: 8.6 MUD CHLORIDES (PPM): 500 FLUID LOSS (C3): 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): .000 MUD AT MAX CIRCULATING TERMPERATURE: .000 MUD FILTRATE AT MT: .000 MUD CAKE AT MT: .000 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 .0 193.0 .0 .0 Name Service Unit Min Max Mean Nsam DEPT FT 13529 13815 13672 573 ROP MWD020 FT/H 0.49 177.52 42.0007 451 GR MWD020 API 6.94 172.09 27.186 450 First Reading For Entire File .......... 13529 Last Reading For Entire File ........... 13815 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 01/08/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 First Reading 13529 13590 13529 Last Reading 13815 13815 13753.5 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Page 5 3-25A N-24.tapx -- Date of Generation ....... 01/08/28 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 .5000 DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE NCNT FCNT NPHI DRHO RHOB PEF GR FET RPD RPM RPS RPX ROP $ LOG HEADER DATA DATE LOGGED: SOFTWARE START DEPTH 13713.0 13713 0 13713 0 13723 0 13723 0 13723 0 13754 0 13755 5 13755 5 13755 5 13755 5 13755.5 13815.5 SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 CTN COMP THERMAL NEUTRON SLD STABILIZED LITHO DEN $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY S): MUD PH: MUD CHLORIDES PPM): FLUID LOSS (C3 : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): STOP DEPTH 14331 0 14331 0 14331 0 14347 0 14347 0 14347 0 14368 0 14375 0 14375 0 14375 0 14375 0 14375 0 14428 0 10-APR-01 Insite 65.44 Memory 14428.0 93.2 96.8 TOOL NUMBER PB01965GR4 PB01965GR4 PB01965GR4 PB01965GR4 6.000 LSND 9.60 53.0 9.1 1100 4.9 2.500 1.011 2.000 2.800 70.0 183.0 72.0 75.0 Page 6 3-25A N-24.tapx TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 NPHI MWD030 PU-S 4 1 68 32 9 FCNT MWD030 CNTS 4 1 68 36 10 NCNT MWD030 CNTS 4 1 68 40 11 RHOB MWD030 G/CM 4 1 68 44 12 DRHO MWD030 G/CM 4 1 68 48 13 PEF MWD030 B/E 4 1 68 52 14 Name Service Unit Min Max Mean Nsam DEPT FT 13713 14428 14070.5 1431 ROP MWD030 FT/H 0 557.77 29.5697 1226 GR MWD030 API 7.67 166.19 22.1533 1229 RPX MWD030 OHMM 4.49 260.23 153.202 1240 RPS MWD030 OHMM 4.22 1980.06 518.8 1240 RPM MWD030 OHMM 4.22 1980.06 518.8 1240 RPD MWD030 OHMM 5.22 1981.92 693.201 1240 FET MWD030 HOUR 1.49 108.07 13.8542 1240 NPHI MWD030 PU-S 8.48 29 17.3172 1237 FCNT MWD030 CNTS 456.3 2030.8 1060.7 1237 NCNT MWD030 CNTS 25122.5 44455.5 34729.1 1237 RHOB MWD030 G/CM 2.072 2.441 2.237 1249 DRHO MWD030 G/CM -0.03 0.147 0.0284836 1249 PEF MWD030 B/E 1.83 5.3 3.16909 1249 First Reading For Entire File .......... 13713 Last Reading For Entire File ........... 14428 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Nuraber ........... 1.0.0 Date of Generation ....... 01/08/28 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 First Reading 13713 13815.5 13754 13755.5 13755.5 13755.5 13755.5 13755.5 13713 13713 13713 13723 13723 13723 Last Reading 14428 14428 14368 14375 14375 14375 14375 14375 14331 14331 14331 14347 14347 14347 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 01/08/28 Page 7 3-25A N-24.tapx Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 01/08/28 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Page 8