Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-056 Imam' '~roject Well History File Cover~'" .ge XHVZE This page identifies those :items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Organizing RESCAN [] Color items: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: DIGITAL DATA [] Diskettes, No. [] Other, No/Type BY: BEVERLY ROBIN VINCENT SHER~WlNDY Project Proofing BY: BEVERLY ROBIN VINCENT SHERYL~INDY Scanning Preparation / x 30 = BY: BEVERLY ROBIN VINCENT SHERY~WINDY OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other DATE: ~ ' / Production Scanning PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~ YES BY: BEVERLi~~ VINCENT SHERYL MARIA WINDY DATE:~:~-//:~,,.~ 'S'~ Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: __ YES BY: BEVERL~NCENT SHERYL MARIA WINDY DATE:~_~_.~/S/~~ (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) NO NO RESCANNED BT': BEVERLY ROBIN VINCENT SHERYL MARIA WINDY General Notes or Comments about this file: DATE: IS/ Quality Checked 12/10102Rev3NOTScanned.wpd e e :C~,-. ..,.~ .., MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc Memorandum State of Alaska Oil and Gas Conservation Commission To: Re; Well File 201-056 Expired Permit Action WELL: Colville River Unit CDI-18XX Permit Issued: 4/05/2001 DATE April 6, 2003 API# 50-103-20373-00 This memo will remain at the front of the subject well file. Our adopted conventions for assigning APl numbers, permit numbers and well names did not specifically address expired or cancelled permits. This omission has caused some inconsistencies in the treatment of these kinds of applications for permit to drill. Operators have asked us to adopt formal procedures for this class of permit application in order to prevent future database disparities. If a permit expires or is cancelled by an operator, the permit number of the subject permit will remain unchanged. The APl number and in some instances the well name refiect the number of preexisting redrills and or multilaterals in a well. In order to prevent confusing a cancelled or expired permit with an active well or multilateral these case sensitive well identifiers will be changed for expired and cancelled applications for permits to drill. The well number for a cancelled or expired permit is modified with an appended XX. EXPIRED PERMITS ARE RELEASABLE 2 years from the approval date on the application approved by the commission, unless the operator ask for extended confidentiality. AOGCC database has been changed to reflect these changes to this permit. Steve McMains Statistical Technician ALASKA OIL AND GAS CONSERYA~I~ION COMMISSION TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Chip Alvord Drilling Team Leader Phillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Re~ Colville River Unit CD 1-18 Phillips Alaska, Inc. Permit No: 201-056 Sur Loc: 344' FNL, 2454' FWL, Sec. 05, T1 IN, R5E, UM Btmhole Loc. 844' FNL, 1604' FWL, Sec. 25, T12N, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill .does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager'at 659-3607. Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this ~ -~ ~ day of April 2001. jjc/Enclosures cc: Department offish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA J~/~R 0 9 Z001 ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL ^laska Oas cons. Commission 20 AAC 25.005 Anchorage la. Type of Work Ddll X Reddll I lb Type of Well Exploratory Stratigraphic Test Development Oil Re-Entry Deepen! Service X Development Gas Single Zone X Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Phillips Alaska, Inc. DF 56' feet Colville River Field 3. Address 6. Property Designation~_~ _ ,~(.. Alpine Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 -ADtr2.555°,?,~ .~' 4. Location of well at sudace 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 344' FNL, 2454' FWL, Sec. 05, T11N, R5E, UM Colville River Unit Statewide At target (=7' casing point ) 8. Well number Number 537' FSL, 1596' FEL, Sec. 25 T12N, R4E, UM CD1-18 #59-52-180 At total depth 9. Approximate spud date Amount 844' FNL~ 1604' FWL, Sec. 25~ T12N, R4E, UM 05/05/2001 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) Property line Alpine CD1-17 18005' MD Crosses T11N feet 10.0' at 200' Feet 2560 7051' TVD feet R5E to T12N R4E 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.085(e)(2)) Kickoff depth feet Maximum hole angle 90.32~ Maximum surface 2494 psig At total depth ('rVD) 3165 at psig CD1-18PH:250' 6995' CD1-18:13194' 'rVD.SS 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling. Length MD TVD MD TVD (include stage data) 42" 16" 62.5# H-40 Weld 77' 37' 37' 114' 114' Pre-installed 12.25" 9.625" - 36# J-55 BTC 2990' 37' 37' 3027' 2400' 556 Sx Arcticset III L & 230 Sx Class G 8.5" 7" ' 26# L-80 BTO-M 13547' 37' 37' 13584' 7076' 136 Sx Class G N/A 4.5" 12.6# L-80 IBT-M 13138' 32' 32' 13170' 6984' Tubing , 19.. To be completed for Reddll, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet' Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length. Size Cemented Measured depth True Vertical depth Structural Conductor Surface Intermediate Production Liner .. Perforation depth: measured true vertical 20. Attachments . Filing fee X ' Property plat BOP Sketch Diverter Sketch Drilling program X Drilling fluid program X Time vs depth plot .. ' ' Refraction analysis Seabed report 20 AAC 25.050 requirements X , , 21. I hereby certify that the foregoing is true and correct to the best of my knOwledge Signed ~ ,~ ~,~ Title Drilling Team Leader Date Commission Use Only . ~ Permit Number I APl number I Approval date _~L~, J qi0 i I see cover letter for · ~. ~:~/'- 4;) .~' 50- /~ ~ ~ C~ ~ ~ ~ ' Other requirements Conditions of approval Samples required Yes /1~) ' . Mud log rdquired . Yes ~ ' . . Hydrogen sulfide measures Yes ~) ~'"'"'Directional survey required · ~ No Required working pressure for BOPE ' Other: ~,~..e'e,,e¢.~,3~- ~,,,~'~-~.,~?.5 ~,~ ~,~.'~.,, // ~"" ~,y'o! ':.%~,.~.", ~, ,, ;' by order of Approved by Commissioner the commission Date _ Form 10-401 Rev. 7-24-89 ~, ,n triplicate Oi: iGitiAL CD1-18 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 12-1/4" Hole / 9-5/8" Casinq Interval Event Risk' ~.evel Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision None N/A Gas Hydrates Low Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, Iow mud temperatures Running Sands and Gravels Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps, run gravel isolation string. Abnormal Pressure in Low Diverter drills, increased mud weight Sudace Formations >2000' TVD Lost Circulation Low Reduced pump rates, mud rheology, lost circulatior~ material, use of Iow density cement slurries ~ ,. LL 8-1/2" Hole / 7" Casinq Interval Event Risk Level Mitigation Strategy [J 'Abnormal Pressure in Moderate BOPE drills, Keep mud weight above 10.4 ppg. ~ Surface Formations Check for flow during connections and if needed, ~ >2000' TVD increase mud weight. The Alpine sand may be gas [~ . charged or abnormally pressured due to gas injection in CD1-31. Lost circulation. Low Reduced pump rates, redUced trip speeds, real time equivalent circulating density (ECD) monitoring, mud ' rheologY, lost circulation material Hole swabbing on 'trips Moderate Reduced trip speeds, mud Properties, proper hole filling, pumping out of hole, real time equivalent ~ circulating density (ECD) monitoring, weighted ,, sweeps... Abnormal Reservoir Medium Well control drills, increased mud weight. No Pressure mapped faults occur within 700' of the planned wellbore. The Alpine sand may be gas charged or '. abnormally pressured due to gas injection in CD1- .. 31. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well . .. control practices, mud scavengers J J 6-1/8" Hole / Horizontal Production Hole Event ~Risk Level Mitigation Strategy' Lost circulation LoW Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud. rheology, lost. circulation material Hole swabbing on trips Moderate Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Abnormal Reservoir Medium BOPE drills, Keep mud weight above 9.3 ppg. Pressure. '. Check for flow during connectionS and if'needed, · increase mud weight. Well control drills, increased mud weight. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control praCtices, mud scavengers Alpine: CD1-18PH (Pilot Hole) & CD1-18 Procedure 1. Install diverter. Move on Doyon 19. Function test diverter. . 3. 4. 5. 6. 7. 8. 9. 10. Drill 12 1/4 inch hole to the sudace casing point as per the directional plan. Run and cement 9 5/8 sudace casing. Install and test BOPE to 3500 psi. Pressure test casing to 2500 psi. Drill out 20' of new hole. Perform leak off test. Drill 8 Y2" hole to a point +/- 100' TVD below the base of the Alpine Sand. Set 400 ft cement plug #1 from TD to +/- 13283'. Set 350 ft cement plug #2 from +/- 13283 to +/- 12933'. RIH with drilling assembly. Dress off plug #2. Kick off at +/- 13472' and drill sidetrack to intermediate casing point in the Alpine Reservoir. 11. Run and cement 7 inch casing as per program, Top of cement +/- 600 feet MD above Alpine reservoir. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 12. BOPE test to 5000 ,ps!, 13. Run in hole with scraper and cleanout assembly. 14. Rig up Schlumberger and run CBL logs. 15. Run drilling assembly. Pressure test casing t(~ 3500 psi. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW. 16. Drill 6 1/8" horizontal section to well TD. 17. Contingency - set open hole isolation equipment if required (due to unconsolidated formation or wellbore having moved out of the Alpine reservoir sand). 16. Displace well to brine and pull out of hole. 17. Run 4 Y2, 12.6 #, L-80 tubing with CAMCO DB nipple, production packer and XN nipple. Land hanger. 18. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 19. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 20. Circulate tubing to diesel and install freeze protection in the annulus. 21. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 mins. 22. Set BPV and secure well. Move rig off. Well Proximity Risks: Directional drilling/collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD1-17 will be the closest well to CD1-18 (10' at 200' MD). Accounting for survey tool inaccuracy, the ellipse separation between these wells will be 8.2' at 337'. There is also a deep crossing Alpine 3, an abandoned exploration well. At the crossing depth, Alpine 3 has cement in place and the planned separation of the wells is 218, feet. DrillinQ Area Risks: Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development wells. No mapped faults occur within 700' of the planned wellbore. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumpin.q Operations: Incidental fluids developed from drilling operations on well CD1-18 will be injected into the annulus of another permitted well on the CD1 pad. The CD1-18 sudace/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there will be 1000' of cement fill above the top of the Alpine. We request that CD1-18 be permitted for annular pumping of fluids occurring as a result of drilling operations, per regulation 20 AAC' 25.080. As stated above, any zones containing significant hydrOcarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. . .... ' . Sudace casing will be set~ below the base of the Schrader Bluff Formation (C-30). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers ~to fluid flow in' other areas. The maximum volume of fluids'to be pumped down the annulus of this well will'not :exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Sud. Shoe TVD) + 1,500 psi , = (12.0 ppg) * (0.052) * (2400') + 1,500 psi = 2,998 psi Pore Pressure = 1,086 psi . Therefore Differential= 2998 - 1086 = 1912 Psi. .. The internal Casing presSure is conservative, since frictional losSes while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the folloWing table: Wt Connection 85% of . "85% of OD (ppf) Grade Range', Type Collapse Collapse Burst Burst 9-5/8" 36 J-55 3 BTC 2,020 psi 1,717 psi 3,520 psi 2,992 'Psi 7" 26 L-80 3. BTC-Mod 5,410 psi 4,599 psi 7,240 psi 6,154 psi ,. , 'REcEiVED Gas CONS. Commission Anchorage CD1-18 & CD1-18 PH DRILLING FLUID PROGRAM SPUD to Intermediate hole to 7" Production Hole 9-5/8"surface casing casing point - 8 Y2" Section - 6 1/8" point- 12 1,4" Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 9.2 ppg PV 10 - 25 10 -15 YP 20 - 60 15 - 25 25 - 30 Funnel Viscosity 100 - 200 Initial Gels 4 - 8 10 - 15 10 minute gels <18 12 - 20 APl Filtrate NC - 10 cc / 30 min 4 - 12 cc/30 rain (drilling) HPHT Fluid Loss at 160 12 - 14 cc/30 min PH 8.5 - 9.0 9.0 - 10.0 9.0 - 9.5 KCL 6 % Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline viscosity at +_ 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Section: Fresh water gel / polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of Iow drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section: The horizontal production interval will be drilled with a M-I FIo-Pro drill-in fluid. The base fluid will consist of 6% KCI, with +_ 30PPB calcium carbonate bridging material to minimize formation damage. FIo-Vis Polymer and DuaI-FIo starch will be used for viscosity and fluid loss control respectively. Colville River Field CD1-18PH Pilot Hole- Prior to Sidetracking RKB - GL = 37' Updated 05/06/2001 9.8 ppg drilling mud in hole I Top Alpine Reservoir at 13335' MD / 7059' TVD Pilot Hole TD at 13683' MD /7216' TVD (+/- 63.13° inc.) Cement Plug Wellhead iil' 16"~i Conductor toll 4' ill 9-5/8" 36 ppf J-55 BTC Surface Casing 3027' MD / 2400' TVD cemented to surface RECEIVED M/~R 0 9 Z001 Alaska Oil & Gas Cons. Commission Anchorage Pluq #2: 350', 17 ppq (top at +/-12933') iIi i il oo. Top of cement plug dressed off to 13249' MD / 6975' TVD (+/- 63.13" inc.) Top of Cement Plug #1 at +/- 13283' Colville River Field CD1-18 Injection Well Completion Plan 16" Conductor to 114' Updated 03/06/2001 4-1/2" Camco DB Nipple (3.812" ID) at 2000' TVD = 2233' MD A1 Injection Valve (2.125"1D) - to be installed later 9-5/8" 36 ppf J-55 BTC Surface Casing @ 3027' MD / 2400' TVD cemented to surface 4-1/2" 12.6 ppf L-80 IBT Mod. R~3 tubing run with Jet lube pipe dope Packer Fluid mix: 9.6 ppg KCl Brine with 2000' TVD diesel cap Tubing Supended with diesel C. pmpletion MD TVD. Tubing Hanger 4-1/2", 12.6#/ft, IBT-Mod Tubing Camco DB Nipple 4-1/2", 12.6#/ft, IBT-Mod Tubing S3 Packer (c/w handling pups) 4-1/2" tubing joint (1) HES "XN" (3.725" ID) - 63.7o 4-1/2" 10' pup joint WEG - 64.3° 32' 32' 2233" 2000' 13101' 6979' 13159' 6979' 13170' 6984' · ii~.==:,, Baker S3 Packer at +/- 13101' (+/-300' MD above to top Alpine) ' :'!,'i,"~;,-~ TOC @ +/- 12801' MI ...... (+600' MD above top Alpine) Top Alpine at 13401' MD / 7058' TVD 7" 26 ppf L-80 BTC Mod Production Casing @ 13584' MD / 7076' TVD @ 90.32° Well TD at 18005' MD / 7051' TVD Colville River Field CD1-18 Injection Well Completion Plan Formation Isolation Contingency Options Updated 03/06/2000 16" Conductor to 114' 4-1/2" Camco DB Nipple (3.812" ID) @ 2000' TVD = 2233' MD 9-5/8" 36 ppf J-55 BTC Surface Casing @ 3027' MD / 2400' TVD cemented to surface 4-1/2" 12.6 ppf L-80 IBT Mod. tubing run with Jet Lube Run'n'Seal pipe dope RECEIVED ~I~ 0 9 ~001 Alaska Oil & Gas Cons. Commission Anchorage . (A) Bonzai ECP Assembly - Baker ZXPPacker (4.75" ID) - Baker HMC Liner Hanger - XO to IBT-Mod -'blank 4-1/2" joints (TBD) -,Cementing Valve - Baker Payzone ECP (mud inflated) -Landing Collar., - 4-1/2" joint (1- 2) blank - Guide Shoe. (B) Open Hole Scab Liner - Baker Payzone'ECP (cement inflated) - 4-1/2" joints (TBD) blank tbg - Baker Payzone ECP (cement inflated) - Baker Model XL-10 ECP (anchor) - MUleshoe / Entry Guide (C) Open Hole Brid.qe Plu,q Assembly - Baker Payzone ECP (cement inflated) -XO -Float Collar - 4-1/2" Float ShOe TOC @ +/- 12801' Mr (+600' MD above top Alpine) ~X~c Well TD at 18005' MD / ~ ~..-=,, Baker S3 Packer set at +/- 13101' 7051' TVD ' ............. :" ...... '~;~,~jil;:.. . , 7" 26 ppf L-80 BTC M°d Production Casing @ 13584' MD / 7076' TVD @ 90.322 CD1-18 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114 / 114 10.9 52 53 9 5/8 3027 / 2400 14.2 1086 1532 7" 13584 / 7076 16.0 3202 2494 N/A 18005 / 7051 16.0 3191 N/A · NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 3500 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1ID Where: ASP = Anticipated Surface pressure in psi FG - Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in. ft RKB OR 2) ASP= FPP- (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 1. Drilling below conductor casing (16") ASP = [(FG x 0.052)- 0.1] D = [(10.9 x 0.052) -0.1] x 114 = 53 psi OR ASP -- FPP - (0.1 x D) -- 1086 - (0.1 x 2401') = 846 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052)-0.1] D -- [(14.2 x 0.052) -0.1] x 2400 = 1532 psi OR ASP = FPP - (0.1 x D) = 3202 - (0.1 x 7076') -- 2494 psi 3. Drilling below intermediate casing (7") ASP = FPP - (0.1 x D) = 3095 - (0.1 x 7076') = 2494. psi Alpine CD1-18 Cementinq Requirements 9 5~8" Surface Casinq run to 3027' MD / 2400' TVD. Cement from 3027' MD to 2527' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2527' to surface with Arctic Set Lite 3. Assume 300% excess annular volume in permafrost and 50% excess below the permafrost. Lead slurry: System: Tail slurry: System: (2527-1632') X 0.3132 ft3/ft X 1.5 (50% excess) = 420.5 ft3 below permafrost 1632' X 0.3132 ft3/ft X 4 (300% excess) = 2044.6 ft3 above permafrost Total volume = 420.5 + 2044.6 = 2465.1 ft3 => 556 Sx @ 4.44 ft3/sk , 556 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.44 ft3/sk, Class G'+ 30% D053 thixotropic additive, 0.6% D046 antifoamer, 1.5% D079 extender, 1.5% S001 accelerator, 50% D124 extender and 9% BWOW~ D044 freeze suppressant 500' X 0.3132 ft3/ft X 1.5 (50% excess) = 234.9 ft3 annular volume ' 80' X 0.4341 ft3/ft = 34.7 ft3 shoe joint volume Total volUme = 234.9 + 34.7 = 269.6 ft3 => 230 Sx @ 1.17 ft3/sk ;, 230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1% S001 accelerator @ 15.8 PPG yielding 1.17 ft3/sk ' Pilot Hole Pluq Back CD1-18PH Cement Plug #1 · 13683' MD to 13283' MD--400'. .. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 400' X 0.3941 ft3/ft X 1.15 (15% excess) = 181.3 fta => 157 Sx @ 1.16 ft3/sk . CD1-18PH Cement Plug #2' 13283' MD to 12933' MD--350'. Cement with Class G + additiVes @ 17 ppg~ Assume 15% excess on open hole volume. Slurry: 350' X 0.3941 ft3/ft X 1.15 (15% excess) = 158.6 ft3 => 159 sx @ 1.00 ft3/sk ., 7" Intermediate Casinq 'run to 13584' MD 17076' TVD Cement from 13584' MD to +/- 12801' MD (500' MD above top of Alpine formation) With Class G +, adds @ 15.8 PPG. Assume 40% excess annular volume. ,. , , Slurry: (13584' - 12801 )'X 0.1268 It/ftX 1.4 (40 Ye exC'ess) = 139.0 ft3 annular volume 80' X 0.2148 ft /ft = 17.2 ft shoe ioint volume Total volume = 139.0 + 17.2 -. 156.2 ft3 => 136 S'x @ 1.15 ftO/sk System: 136 Sx Class G+ 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and 0.18% D167 fluid loss additive @ 15.8 PPG yielding 1.15 ffa/sk , RECEIVED , MAR' 0 9 .ZO O1 · 'Alaska Oil & Gas Cons. Commission Anchorage I By Weight Of mix Water, all other additives are BWOCement ATTACHMENT 5 Creole~ lc~ bmk:~el For: ¥ Johnson DQIe pJotted : 5--Mat--2001 P)ot Reference is CDt-lB Versl3. CoofdTnot~ are in fe~.t referer~ce stat ~'JS. True Ver~aJ Ospth= a~r~'~ce RIce (Doyo. 19).J Phillips Alaska, Inc. Structure: CD#I Well : 18 Field : Alpine Field Location : North Slope, Alaska PROFILE COMMENT DATA Point MD Inc Dir TVD North East V. Sect Deg/1 O0 KOP Beg Fnl BId/Trn 13149.56 65.15 302.69 6974.98 5853.81 -8654.54 9254.98 0.00 LCU 13156.09 63.51 303.21 6978.00 5857.08 -8659.59 9240.25 9.00 Miluveach A 1 5245.01 68.75 509.85 701 4.00 5905.49 -8724.60 9513.64 9.00 Alpine D 13333.03 74.17 315.93 7042.00 5962.28 -8785.65 9392.45 9.00 Alpine 13400.61 78.45 520.38 7058.00 6011.19 -8829.41 9456.19 9.00 Tgt- Csg Pt.-EOC 15584.28 90.52 351.96 7076.00 6162.60 -8930.66 9637.42 9.00 TD 18004.56 90.32 551.96 7051.00 10065.95 -11008.62 14057.65 0.00 Phillips Alaska, Sfructure: CD#I Field: Alpine Field InC. Well: 18PH Locallon: North Slope. Alaska ATTACHMENT 5 Point KOP Build 3/100 West SOk Beg BId/Trn Permofrost C-40 EOC 9 5/8 Casing Pt. C-30 C'20 <-3 ~,lbian-97 Albion-96 HRZ K-1 LCu Miluveoch A Alpine D PH Tgt/Alpine B/Alpine/UdU TD PROFILE MD 250.00 750.00 1058.88 1185.33 1631.76 2550.32 2675.81 5027.41 3040.68 3815.04 6071.75 6226.62 10319.67 10939.16 12552.15 12945.86- 15156.05 15255.69 15297.64 15355.26 i 5459.24 15682.61 Inc .0.00 10.00 19.27 25.00 . 34.06 59.60 63.13 63.13 65.13 65.13 65.13' 65.15 65.13 63.13 65.13 63.13 63.13 63.13 63.13 65.15 65.15 63.15 COMMENT Dir TVD 555.00 250.00 535.00 747.47 335.00 1046.00 355.00 11 62.06 518.65 1556.00 503.96 2181.00 302.69 2240.18 302.69 2400.00 502.69 2406.00 502.69. 2756.00 502.69 3776.00 302.69 3846.00 .302.69 5696.00 302.69 5976.00 ,302.69 6696.00 302.69 6885.00 302.69 6978.00 302.69 7014.00 302.69 7042.00 502.69 7059.00 502.69 7106.00 502.69 7216.00 DAT . North 0.00 39.44 110.09 150.75 525.25 747.81 807.33 977.67 984.07 1357.11 · 2444.25 2518.86 4490.64 4789.07 5556.47 5755.78 5857.03 5895.40 5925.24 5943.36 5993.45 6110.70 A East 0.00 -18.39 -51.34 -70.29 -190.84 -699.18 -789.74 -1055.21 -1065.17 - 1646.55 -5340.77 -5457.04 -6529.95 -6995.01 -8190.95 -8501.56 -8659.56 -8719.15 -8765.66 -8793.90 -8871.97 .-9054.68 V. Sect 0.00 37.34 104.20 142.69 340.29 998.11 1106.48 1 421.80 1 433.64 2124.18 4136.63 4274.74 7924.78 8477.21 9897.77 10266.72 10454.15 10525.18 10580.42 10613.96 10706.69 10923.72 Deg/1 O0 0.00 2.00 3.00 3.00 3.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ATTACHMENT 5 600 1200 1800 ~' 2400 ,.+_ r- 3o0o ~ 4~o0 4800 5400 6000 6600 72O0 7800 ~ b~;c~oe~:For Y Johnsoll ~ Rafem~ k CDI-IB r~ V~ol D~tha ~e telerate ' I~[Q ~ ~o~ 2.00 Build 3/1~ DLS: 3.00 deg per 100 ft 15 O0 ; West Sak ~ ~ BBPerm°fr°s~ D~: ~. 41.3~ -~ 46.86 -~ 52.40 C-~O '%. 61.02 EOC ~ 9 5/8 Cesin9 Pt. ~'~ C-30 '~ C -20 --.... '~. K-2 ~.. TAHG~NT AHGLg 63.1 Phillips Alaska, Inc. Struclur*: CD#l Well : 18 Field : Alpine Field Locution : North Slope, Alcmko 304.07 AZIMUTH 109~4' (TO PH TD) ~*Plone of Proposol**~ "",.....,. ~Albio n - 9 7 "'-... Alblon-96 "--.,~ HR7 ~'-~. LCU ' ~,.~ Mi uveoch A -. AIp}n D PH.Tgt%lpine ~ B/Alpine/UJU TD i [ i i ! i i i i i i i ( i i i i i i i i i i i i i i i i i i i i i i i i i i i i O 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800 8400 9000 9600 10200 10BO0 I 140012000 Vertical Section (feet) -> Azimufh 304.61 wifh reference 0.00 S, 0.00 E from slof #18 ATTACHMENT 5 ~ ~m~ :For v Johnson Plot R~ Phillips Alaska, Inc. StructUre: CD#I Well : 18 field: Alpine Field Location: North Slope, Alaska 331.96 AZIMUTH 14058' (TO TD) ' ***Plane of Proposal*** 6250 ~ TARGET/FINAL ANGLE 90.32 DEG 6500 Miluveach ~ ~~ Alptne u ~ - PH Tgt/Npi0e B~NpJne/UJU 725O ~ ~ - 7~50] ;,, ~ ..... , ....... ' ....... ! ! ! ! i i J i ! i i ! t i i ! i ! ! i i i i i 8500 8750 g000 92.50 9500 9750 ' 10000 10250 10500 10750 11000 11250 11500 11750 12000 12250 12500 12750 13000 13250 ! 350013750 ;14000 14250 ' ' Verticol Section (feet) .Azimuth 551.96'with reference'Oio0 N, 0.00 E from slot #18 ATTACHMENT 5 Alaska, Inc. Well : 18PH Location : North Slope. Alaska <- West (,feet) 12000 11200 10400 9600 8800 8000 7200 6400 5600 4800 4000 3200 2400 1600 800 0 800 I [ I I I I I I I I I I I I I J I I I , I [ I I I I I I I I I I I ,, \, \ TD LOCATION: 844' FNL, 1604' FWL SEC. 25, T12N, R4E ~( [ TARGET LOCATION:1 '' 537' FSL, 1596' FEL . \ SEC. 25. T12N. R4E , TD \' Tql: - Csg Pt.-EOC PH TD LOC: A ' U ',' 485' FSL. 1720' FEL ! ~H /gt/A~pjn~ n "~l~lhu_ve~ch A PH TARCET LoC: I 317' FSL 14-59' FELl SEC, 25."r12N. R4£I ",~,,~lbion-96 "',~Albien-g 7 304.07 AZIMUTH 10924' (TO PH TD) ***Plane of Proposol*~* TRUE 'x ,,. "~ K-2 "'-~.C-20 '"x .C-30 9 5/8 Casing Pt. 40 Perm~rosP Beg BId/Trn~ Bu,lcl 37100 ~K~O.P SURFACE LOCATION: I~''~ 344' FNL, 2454' FWL SEC. 5, T11N, RSE 11200 10400 9600 8000 8000 7200 6~00 I 5600 Z 0 4800 ~" 4O0O 3200 2400 1600 800 800 1600 RE'CEiV .' } BAR 0 200 Alaska Oil & Gas Cons. Commission .Anchorage ATTACHMENT 5 /c~.~.~ t~ ~ For: V Johnson Plat RM~meee ~ (::01-18 Vera~13. Phillips Alaska, Inc. Structure : COl~l Well : 18 Field : Alpine Field Location: North Slope, Alaska A I 280 250 24O 220 200 180 160 140 120 100 8o <- West (feet) 220 200 180 160 ! 40 120 1 O0 80 60 40 20 0 20 40 ' k ~'"t',1400 ' ' ~ '~ ~'~,k~l ~00. . '. 1200 . . ~ 400 1200 1000 800 800 60O 6OO 4OO 280 260 240 220 200 180 160 , ~4o I .. Z 0 ,~2o 2,. 100 80¸ 2o 4O '3400 1200 220 200 180 160 140 40 20 0 20 40 120 1 O0 80 60 <,- West (feet) ATTACHMENT 5 Date p~ofled: 5-~-2~1 Plot Re~erence ~ CD1--18 PH Vers~3. C~rdinat~ are in feet f~ence I~ Ve~ol ~p,h, ~e ~e RK~ (~on Phillips Alaska, Inc. Structure: CD#I Well : 18PH Field : Alpine Field Location : Norlh Slope, Alaska 660 A 600 I ~ 540 (D Q) 480 ..,,_ 0 Z 420 <-West (feet) 1020 g~ go0 840 780 720 6~ 600 540 480 420 360 5~ 240 180 120 60 1200 1140 1080 I I I 8~0 I t I I I I I II II II II II II II II If ,' ' .2400 ~ '"""'"-x.x " 720 '"' ~ ~x'~2000 /;800 x~2 ~'~ 'x' 'x 2600  000 ~-~ 1800 ~ xx. ~ 2400 "~. ~..~ 360 300 180 i i i J i i i i i i i I i i i i i i i i i i i 1200 1140 1080 1020 960 900 840 q600 ',,,,, 1 'x 2000 '~ 600 ' x .,..,. ~, 1 40 i i i i i i i t ! i i i i 180 120 6u 780 720 660 600 540 480 420 360 .300 240 West (feet) 840 780 720 660 600 /'~ I 540 0 4BO 420 360 300 240 IBO ATTACHMENT 5 IPhillips Alaska, INC.[ ' Structure: CD#I Well :'18PH Field: Alpine Field Location: North. Slope, Alaska] 1700 1600 1500 2500 2400 - 2300 2200 2100 1400 I 12o ~_ 1200 ..f.- .t 1 lOO 0 900 800 700 <- West (feet) 2000 1900 1800 1700 1600 1500 1400 1300 1200 11 O0 1000 go0 800 700 600 1700 1600 1500 1400 2500 2400 2300 I I I I I I I I I. I I I I I I I I I I I I%1 I " I I I I I I I I I I I I ~4200 3800-'~"'-,~.,,2800 . . .. . .... -, , -, ,~ , ,-,,,,, .... ~ , -~, 22~ 21~ . 2~0 1900 I~0 1700 16~ 15~ 1400 1~0 1200 11~ 10~ 900 West (feet) 1300 1200 1100 1000 A I Z 0 goo ~ 70O 800 700 600 ~o) ATTACHMENT 5 CleWed by bmic~oe! For V Jo:]~nson D~te plotted: 5-~r-2001 Plot Referenc~ ia C01-18 PH VeraJ[3. Coordin~e~ ore in feet reference slot ~18. I True Verl. lc~! Depths ore reference RKB (Doyon 19).I Phillips Alaska, Inc. Structure : CD#I Well : 18PH Field : Alpine Field Location: North Slope, Alaska <- West (feet) 9200 [t800 8400 8000 7600 7200 6800 6400 6000 5600 5200 4800 4400 4000 3600 3200 2800 2400 2000 1600 ~ 5600 5200 ~ . '"- .,. 6200 ~oo '"-.,.?oo ~"-. \~. 2~0 ~ 7100 1600 1200 , [ [j [ , ~ ~ 9200 8800 8400 80~ 7600 7200 6800 64~ 6000 56~ 5200 4800 4~0 4000 36~ 52~ 2800 24~ 2000 1600 <- West (feel) 400O 3600 3200 2800 4800 4400 4000 k~, "-..~. 3600 x \ 2O0 \ ° i ~ 6500 \ s5od'-.,.%:-- / % ~=oo \ '-....~ooo ~ ~ooo % ~ ~~'~,.~.4700 ' ' \ '~5300 \ '%~ 2.00~ ~6oo ~ (~ , , I 1200 I I ! I II I I I I I ATTACHMENT 5 Phillips Alaska, Inc. Structure ~ CD#I Well: 18PH Field : Alpine Field Location : North Slope, Alaska ' <- West (feet) 13500 13000 12500 12000 11500 1000 10500 10000 9500 9000 8500 8000 7500 7000 6500 6000 5500 5000 4500 10500 I I I I I I I I I'. I I I I I I I I I I I ' I I I I I I I I I I I I I I m t I 1O000 95o0 gooo 85OO 8000 7500 ~000 650O 6OOO 550O 500O t . i i i i i i i i i i i i i i i i 71 O0 ~ 700-0-00bU '"'~-~. 6800 -' -~,6700 -- -.,6600 13~ I -' '-',,~ 6500 ! i i i i i i i i~ i i i i i i i i i 13500 13000 12500 12000 11500 11000 10500 10000 9500 9000 8500 8000 7500 7000 6500 6000 5500 5000 4500 <- West (feet) 10500 10000 950o 9000' 85O0 A I Z 8000 0 750O ~ -i- 7000 ~ 650O ATTACHMENT 5 IPhillips Alaska, Inc. Structure: CD~I Well: 18 Reid: Alplne Field Location: North Slope, Alaska 310 , 300 29O 330 320 TRUE NORTH 350 0 10 340 20 70 3O 4o0 40050 6O 6OO 70' 280 8O 270 9O 260 1 O0 25O 110 240 230 150 160 170 Normol Plane Travelling Cylinder - Feet: All depths shown are Measured depths on Reference Well 20 ATTACHMENT 5 32O 310 300 Phillips Alaska, Inc. Structure: CD#I Field: Alpine Reid Well : 18 Location : North Slope, Alaska 33O 34O TRUE NORTH .r--m 350 0 210 10 20 30 40 RECEIVED M~.R 0 ~ Alaska Oil & Gas Cons. Commission Anchorage 50 290 70 280 80 270 2 90 260 lO0 250 , 240 230, 110 %o 1000 50 u~o%0 2O0 19'0' 170 Normol PIc]neTrovelling Cylinder -Feet All depths shown are, Measured depths on Reference Well ATTACHMENT 5 Phillips Alaska, Inc. CD#1 18PH slot #18 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : CD1-18 PH Vets#3 Our ref : prop3019 License : Date printed : 5-Mar-2001 Date created : 27-Jun-1998 Last revised : 5-Mar-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w150 56 46.041 Slot location is n70 20 33.72~,w150 55 34.323 Slot Grid coordinates are N 5975784.950, E 385879.881 Slot local coordinates are 342.87 S 2454.94 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ATTACHMENT 5 Phillips Alaska, Inc. CD#1,18PH Alpine Field, North Slope, Alaska Measured Inclin, Azimuth True Vert Depth Degrees Degrees Depth 0.00 0.00 0.00 0.00 100,00 0,00 335,00 100,00 200,00 0,00 335,00 200,00 250,00 0,00 335,00 250,00 350,00 2,00 335,00 349,98 450,00 4,00 335.00 449,84 550,00 6,00 335,00 549,45 650,00 8,00 335,00 648,70 750,00 10,00 335,00 747,47 816.67 12.00 335.00 812.90 916.67 15.00 335.00 910.13 1016.67 18.00 335.00 1006.00 1058..88 19.27 335.00 1046.00 1116.67 21.00 335.00 1100.25 1183.33 23.00 335.00 1162.06 1200.00 23.37 334.15 1177.38 1300.00 25.68 329,52 1268.37 1400.00 28.11' 325.63 1357.55 1500.00 30.63 322.32 1444.70 1600.00 33.23 '319.47 1529.56 1631.76 34.06 318.65 1556.00 1700.00 35.88 317.00 1611.92 1800.00 38.58 314.83 1691.54 1900.00 41.31 312.90 1768.20 2000.00 '44.07 311.17, 1841.70 2100.00 46.86 309.60 1911.83 2200.00 49.66 308.17 1978.41 2300.00 52.48 306.86 2041.24 2400.00 55.32 305.64 2100.15 2500.00 58.16 304.51 2155.00 2550.32 59.60 303.96 2181.00 2600.00 61.02 303.44 2205.61 2673.81 63.13 302.69 2240.18 3000.00 63.13 302,69 2387.61 3027.41 63.13 302.69 2400.00 3040.68 63.13 302.69 2406.00 3500.00 63,13 302.69 2613.61. 3815.04 63.13 302.69 2756.00 4000.00 63.13' 302.69 2839.60 4500.00 63.13 302.69 3065.59 5000.00 63.13 302.69 3291.58 5500.00 63.1'3 302.69 3517.58 6000,00 63,13 302,69 3743,57 6071,75 63,13 302',69 3776,00 6226.62' 63.13 302.69 3846.00 6500.00 63.13 302.69 3969.56 7000.00 63.13 302.69' 4195.56 7500.00 63.13 302.69 4421.55 8000.00 63.13 302.69 4647.54 8500,00 63,13 302,69 4873,53. RECTANGULAR COORDINATES 0.00 S 0.00 S 0.00 S 0.00 S 1.S8 N 6.32 N 14.22 N 25.27 N 39.44 N 50.97 N 72.13 N 97.87 N 110.09 N 128.12 N 150.75 N 156.67 N 193.20 N 231.33 N 270.94 N 311.94 N 325.23 N 354.20 N 397,63 N 442.08 N 487.45 N 533.61 N 580.43 N 627.79 N 675.55 N 723.58 N 747.81 N 771.76 N 807.33 N 964.47 N 977.67 N 984.07 N 1205.34 N 1357.11 N 1446,21 N 1687.08 N 1927 .'95 N 2168.82 N 2409.69 N 2444.25 N 2518.86 N 2650.55 N 2891.42 N 3132.29 N 3373'.16 N 3614.03 N PROPOSAL LISTING Page 1 Your ref : CD1-18 PH Vers#3 Last revised : 5-Mar-2001 Dogleg Deg/100ft 0.00 E 0.00 0.00 E 0.00 0.00 E 0.00 0.00 E 0.00 0,74 W 2,00 2,95 W 2,00 6,63 W 2,00 11.78 W 2.00 18.39 W 2.00 23,77 W 3,00 33,63 W 3,00 45,64 W 3,00 51,34 W 3,00 59,74 W 3,00 70,29 W 3,00 73,11 W 3,00 92,76 W 3,00 117,05 W 3,00 145,93 W 3,00 179,31 W 3,00 190,84 W 3,00 217.11 W 3.00 259.22 W 3.00 305.52 W 3.00 355.89 W 3.00 410.19 W 3.00 468.28 W 3.00 529.98 W 3.00 595.i4 W 3.00 663.57 W 3.00 699.18 W 3.00 735.09 W 3.00 789.74 W 3.00 1034.63 W 0.00 1055.21 W 0.00 1065.17 W 0.00 1410.01 W 0.00 1646.53 W 0.00 1785.39 W 0.00 2160.76 W 0.00 2536.14 W 0.00 2911.52 W 0.00 3286.90 W 0.00 3340.77 W 0.00 3457.04 W 0.00 3662.28 W 0.00 4037.66 W 0.00 4413.04 W 0.00 4788.42 W 0.00 5163.79 W 0.00 Vert Sect 0.00 0.00 0.00 0.00 KOP 1.50 5,99 13,46 23,92 37,34 48,25 68.27 92.63 104.20 121.26 142.69 148.34 185.08 226.56 272.67 323.29 340.29 378.28 437.49 500.75 567,89 638.73 713.08 790.72 871.45 955.04 998.11 1041.27 1106.48 1397,36 1421.80 1433.64 1843.24 2124.18 2289.12 2735.00 3180.88 3626.77 4072.65 4136.63 4274.74 4518.53 4964.41 5410.29 5856.17 6302.06 Build 3/100 West Sak Beg Bld/Trn Permafrost C-40 EOC 9 5/8" Casing Pt, C-30 C-20 K-3 K-2 All data is in feet unless otherwise stated. Coordinates fr0m,slot #18 and TVD from RKB (Doyon 19) (56.00 Ft above mean sea level). Bottom hole distance is 10923.73 on azimuth 304.01 degrees from wellhead. Total Dogleg for wellDath is 67.71 degrees. Vertical section is from wellhead on azimuth 304.07 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ Alaska Oil & Gas Cons. Commission Anchorage ATTACHMENT 5 Phillips Alaska, Inc. CD#I,18PH Alpine Field, North Slope, Alaska Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth 9000.00 63.13 302.69 5099.53 9500.00 63.13 302.69 5325.52 10000.00 63,13 302.69 5551.51 10319.67 63.13 302.69 5696.00 10500.00 63.13 302.69 5777.51 10939.16 63.13 302.69 5976.00 11000.00 63.13 302.69 6003.50 11500.00 63.13 302,69 6229.49 12000.00 63.13 302.69 6455.48 12500.00 63.13 302.69 6681.48 12532.13 63.13 302.69 6696.00 12945.86 63.13 302.69 6883.00 13000.00 63,13 302.69 6907.47 13149.36 63.13 302,69 6974.98 13156.05 63,13 302.69 6978.00 13235.69 63.13 302.69 7014.00 13297.64 63.13 302.69 7042.00 13335.26 63.13 302.69 7059.00 13439.24 63,13 302.69 7106.00 13500.00 63,13 302.69 7133.46 13682.61 63,13 302.69 7216.00 PROPOSAL LISTING Page 2 Your ref : CDi-18 PH Vers#3 Last revised : 5-Mar-2001 R E C T A N G U L A R Dogleg Vert C 00 R D I N A T E $ Deg/100ft Sect 3854.90 N 5539.17 W 0.00 6747.94 4095.77 N 5914.55 W 0.00 7193.82 4336.64 N 6289.93 W 0.00 7639.70 4490.64 N 6529.93 W 0.00 7924.78 Albian-97 4577.51 N 6665.31 W 0.00 8085.58 4789.07 N 6995.01 W 0.00 8477.21 Albian-96 4818.38 N 7040.69 W 0.00 8531.47 5059.25 N 7416.07 W 0.00 8977.35 5300.12 N 7791.45 W 0.00 9423.23 5540.99 N 8166.82 W 0.00 9869.11 5556.47 N 8190.95 W 0.00 9897.77 HRZ 5755.78 N 8501.56 W 0.00 10266.72 K-1 5781.86 N 8542.20 W 0.00 10314.99 5853.81 N 8654.34 W 0.00 10448.19 5857.03 N 8659.36 W 0.00 10454.15 LCU 5895.40 N 8719.15 W 0.00 10525.18 Miluveach A 5925.24 N 8765.66 W 0.00 10580.42 Alpine D 5943.36 N 8793.90 W 0.00 10613.96 PH Tgt/Alpine 5993.45 N 8871.97 W 0.00 10706.69 B/Alpine/UJU 6022.72 N 8917.58 W 0.00 10760.88 6110.70 N 9054.68 W 0.00 10923.72 TD All data is in feet unless otherwise stated. Coordinates from slot #18 and TVD from RF, B (Doyon 19) (56.00 Ft above mean sea level). Bottom hole distance is 10923.73 on azimuth 304.01 degrees from wellhead. Total Dogleg for wellpath is 67.71 degrees. Vertical section is from wellhead on azimuth 304.07 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ATTACHMENT 5 Phillips Alaska, Inc. CD#l, 18PH Alpine Field, North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : CD1-18 PH Vets#3 Last revised : 5-Mar-2001 Comments in wellpath MD TVD Rectangular Coords. Comment 250.00 250.00 0.00 S 0.00 E KOP 750.00 747'.47 39.44 N 18.39 W Build 3/100 1058.88 1046.00 110.09 N 51.34 W West Sak 1183.33 1162.06 150.75 N 70.29 W Beg Bld/Trn 1631.76 1556.00 325.23 N 190.84 W Permafrost 2550.32 2181.00 747.81 N 699.18 W C-40 2673.81 2240.18 807.33 N 789.74 W EOC 3027.41 2400.00 977.67 N 1055.21 W 9 5/8" Casing Pt. 3040.68 2406.00 984.07 N 1065.17 W C-30 3815.04 2756.00 1357.11 N 1646.53 W C-20 6071.75 3776.00 2444.25 N 3340.77 W K-3 6226.62 3846.00 2518.86 N 3457.04 W K-2 10319.67 5696.00 4490.64 N 6529.93 W Albien-97 10939.16 5976.00 4789.07 N 6995.01 W Albian-96 12532.13 6696.00 5556.47 N 8190.95 W HRZ 12945.86 6883.00 5755.78 N 8501.56 W K-1 13156.05 6978.00 5857.03 N 8659.36 W LCU 13235.69 7014.00 5895.40 N 8719.15 W Miluveach A 13297.64 7042.00 5925.24 N 8765.66 W Alpine D 13335.26 7059.00 5943.36 N 8793.90 W PH Tgt/Alpine 13439.24 7106.00 5993.45 N 8871.97 W B/Alpine/UJU 13682.61 7216.00 6110.70 N 9054.68 W TD RECEIVED 0 9 2001 , Alaska Oil & Gas Cons. Commission Anchorage Casing positions in string 'A' TopMD TOp TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 3027.41 2400.00 977.67N 1055.20W 9 5/8" Casing , Targets associated with this wellpath = ==== =================== ============ , , Target name Geographic Location T.V.D. Rectangular Coordinates' Revised CD1-18 PH Tgt RvSd 2 7059.00 5943.36N 8793.90W ,,5-Mar-2001 ATTACHMENT 5 Phillips Alaska, Inc. CD#1 18PH slot #18 Alpine Field North Slope, Alaska PROPOSAL LISTING Baker Hughes INTW. Q Your ref : CD1-18 PH Vers#3 Our ref : prop3019 License : Date printed : 5-Mar-2001 Date created : 27-Jun-1998 Last revised : 5-Mar-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w150 56 46.041 Slot location is n70 20 33.724,w150 55 34.323 Slot Grid coordinates are N 5975784.950, E 385879.881 Slot local coordinates are 342.87 S 2454.94 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ATTACHMENT 5 Phillips Alaska, Inc. CD~I,18PH Alpine Field,North Slope, Alaska Measured Inclin Azimuth. True Vert Depth Degrees Degrees Depth 0.00 0.00 0.00 0.00 100.00 0.00 335.00 100.00 200.00 0.00 335.00 200.00 250.00 0.00 335.00 250.00 350.00 2.00 335.00 349.98 450.00 4.00 335.00 449.84 550.00 6.00 335.00 549.45 650.00 8.00 335.00 648.70 750.00 10.00 335.00 747.47 816.67 12.00 335.00 812.90 916.67 15.00 335.00 910.13 1016.67 18.00 335.00 1006.00 1058.88 19.27 335.00 1046.00 1116.67 21.00 335.00 1100.25 1183.33 23.00 335.00 1162.06 1200.00 23.37 334.15 1177.38 1300.00 25.68 329.52 1268.37 1400.00 28.11 325.63 1357.55 1500.00 30.63 322.32 1444.70 1600.00 33.23 319.47 1529.56 1631.76 34.06 318.65 1556.00 1700.00 35.88 317.00 1611.92 1800.00 38.58 314.83 1691.54 1900.00 41.31 312.90 1768.20 2000.00 44.07 311.17 1841.70 2100.00 46.86 2200.00 49.66 2300.00 52.48 2400.00 55.32 2500.00 58.16 309.60 1911.83 308.17 1978.41 306.86 2041.24 305.64 2100.15 304.51 2155.00 2550.32 59.60 2600.00 61.02 2673.81 63.13 3000.00 63.13 3027.41 63.13 3040.68 63.13 3500.00 63.13 3815.04 63.13 4000.00 63.13 4500.00 63.13 303.96 303.44 302.69 302.69 302.69 302.69 302.69 302.69 302.69 302.69 2181.00 2205.61 2240.18 2387.61 2400.00 2406200 2613.61 2756.00 2839.60 3065.59 5000.00 63.13 302.69 3291.58 5500.00 63.13 302.69 3517.58 6000.00 63.13 302.69 3743.57 6071.75 63.13 302.69 3776.00 6226.62 63.13 302.69 3846.00 6500.00 63.13 302.69 3969.56 7000.00 63.13 302.69 4195.56 7500.00 63.13 302.69 4421.55 8000.00 63.13 302.69 4647.54 8500.00 63.13 302.69 4873.53 RECTANGULAR COORDINATES 0.00S 0.00E 0.00S 0.00E 0.00S 0.00E 0.00S 0.00E 1.58N 0.74W 6.32N 2.95W 14.22N 6.63W 25.27N 11.78W 39.44N 18.39W 50.97N 23.77W 72.13N 33.63W 97.87N 45.64W 110.09N 51.34W 128.12N 59.74W 150.75N 70.29W 156.67N 73.11W 193.20N 92.76W 231.33N 117.05W 270.94N 145.93W 311.94N 179.31W 325.23N 190.84W 354.20N 217.11W 397.63N 259.22W 442.08N'. 305.52W 487.45N 355.89W 533.61N 410.19W 580.43N 468.28W 627.79N 529.98W 675.55N 595.14W 723.58N 663.57W 747.81N 699.18W 771.76N 735.09W 807.33N 789.74W 964.47N 1034.63W 977.67N 1055.21W 984.07N 1065.17W 1205.34N 1410.01W 1357.11N 1646.53W 1446.21N 1785.39W 1687.08N 2160.76W 1927.95N 2536.14W 2168.82N 2911.52W 2409.69N 3286.90W 2444.25N 3340.77W 2518.86N 3457.04W 2650.55N 3662.28W 2891.42N 4037.66W 3132.29N 4413.04W 3373.16N '4788.42W 3614.03N 5163.79W PROPOSAL LISTING Page 1 Your ref : CD1-18 PM Versl3 Last revised : 5-Mar-2001 GRID COORDS GEOGRAPHIC Easting Northing C O O R D I N A T E S 385879.88 5975784.95 n70 20 33.72 w150 55 34.32 385879.88 5975784.95 nT0 20 33.72 w150 55 34.32 385879.88 5975784.95 n70 20 33.72 w150 55 34.32 385879.88 5975784.95 n70 20 33.72 w150 55 34.32 385879.17 5975786.54 n70 20 33.74 w150 55 34.34 385877.03 5975791.32 nT0 20 33.79 w150 55 34.41 385873.47 5975799.27 nT0 20 33.86 w150 55 34.52 385868.49 5975810.40 n70 20 33.97 w150 55 34.67 385862.10 5975824.67 n70 20 34.11 w150 55 34.86 385856.91 5975836.28 n70 20 34.23 w150 55 35.02 385847.38 5975857.59 n70 20 34.43 w150 55 35.30 385835.78 5975883.50 nT0 20 34.69 w150 55 35.66 385830.27 5975895.81 nT0 20 34.81 w150 55 35.82 385822.14 5975913.97 nT0 20 34.98 wlS0 55 36.07 385811.94 5975936.76 nT0 20 35.21 w150 55 36.38 385809.22 5975942.73 n70 20 35.27 w150 55 36.46 385790.15 5975979.55 n70 20 35.62 w150 55 37.03 385766.45 5976018.05 nT0 20 36.00 w150 55 37.74 385738.20 5976058.10 n70 20 36.39 w150 55 38.58 385705.46 5976099.61 n70 20 36.79 w150 55 39.56 385694.14 5976113.08 n70 20 36.92 w150 55 39.90 385668.32 5976142.46 nT0 20 37.21 w150 55 40.66 385626.90 5976186.52 n70 20 37.64 w150 55 41.89 385581.30 5976231.69 n70 2038.07 w150 55 43.24 385531.64 5976277.84 nT0 20 38.52 w150 55 44.72 ,3854781075976324.83 nT0 20 38.97 w150 55 46.30 385420.73 5976372.54 n70 20 39.43 w150 55 48.00 385359.77 5976420.85 nT0 20 39.90 w150 55 49.80 385295.37 5976469.61 nT0 20 40.37 ,w150 55 51.70 385227.70 5976518.70 nT0 20 40.84 w150 55 53.70 385192.475976543.48 n70 20 41.08 w150 55 54.74 385156.955976567.98 nT0 20 41.32 w150 55 55.79 385102.855976604.40 n70 20 41.67 w150 55 57.39 384860.465976765.31 n70 20 43.21 w150 56 04.54 384840.09. 5976778.83nT0 20 43.34 w150 56 05.14 384830.23 5976785.38 n70 20 43.40 w150 56 05.44 384488.90 5977011.96 n70 20 45.58 w150 56 15.51 384254.79 5977167.38 n70 20 47.07 w150 56 22.,42 384117.35 '5977258.62. n70 20 47.95 w150 56 26.48, 383745.79 5977505.28 nT0 20 50.32 w150 56 37.45 383374.24 5977751.93 nT0 20 52.69 w150 56 48.41 383002.68 5977998.59 nT0 20 55.06 w150 56 59.38 382631.12 5978245.25 nT0 20 57.43 w150 57 10.35 382577.80 5978280.64 n70 20 57.77 w150 57 11,93 382462.72 5978357.04 n70 20 58.50 w150 57 15.33 382259.57 5978491.90 n70 20 59.79 w150 57 21.32 381888.01 5978738.56 n70 21 02.16 w150 57 32.30 381516.45 5978985.22 n70 21 04.53 w150 57 43.27 381144.90 5979231.87 n70 21 06.90 w150 57 54.24 380773.34 5979478.53 n70 21 09.27 w150 58 05.22 All data in feet unless o=herwise stated. Calculation uses minimum curvature me=hod. Coordinates from slot #18 and TVD from RKB (Doyon 19) (56.00 Ft above mean sea level}. Bottom hole distance is 10923.73 on azimuth 304.01 degrees from wellhead. Total Dogleg for wellpath is 67.71 degrees. vet=ica1 section is from wellhead on azimuth 304.07 de~rees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ., ATTACHMENT 5 Phillips Alaska, Inc. CD#i,18PH Alpine Field,North Slope, Alaska Measured Inclin Azimuth True VertR E C T A Depth Degrees Degrees Depth C O O R D 9000.00 63.13 302.69 5099.53 3854.90N 9500.00 63.13 302.69 5325.52 4095.77N 10000.00 63.13 302.69 5551.51 4336.64N 10319.67 63.13 302.69 5696.00 4490.64N 10500.00 63.13 302.69 5777.51 4577.51N 10939.16 63.13 302.69 5976.00 4789.07N 11000.00 63.13 302.69 6003.50 4818.38N 11500.00 63.13 302.69 6229.49 5059.25N 12000.00 63.13 302.69 6455.48 5300.12N 12500.00 63.13 302.69 6681.48 5540.99N 12532.13 63.13 302.69 6696.00 5556.47N 12945.86 63.13 302.69 6883.00 5755.78N 13000.00 63.13 302.69 6907.47 5781.86N 13149.36 63.13 302.69 6974.98 5853.81N 13156.05 63.13 302.69 6978,00 5857.03N 13235.69 63.13 302.69 7014.00 5895,40N 13297.64 63.13 302.69 7042,00 5925,24N 13335.26 63.13 302.69 7059,00 5943,36N 13439.24 63.13 302,69 7106.00 5993.45N 13500.00 63.13 302.69 7133.46 6022.72N 13682.61 63.13 302,69 7216.00 6110,70N PROPOSAL LISTING Page 2 Your ref : CDi-18 PH Vets#3 Last revised : 5-Mar-2001 NGULAR GRID C OORDS GEOGRAPHIC I N A T E S Eas=ing Nor=hing C O O R D I N A T E S 5539.17W 380401.78 5979725.19 n70 21 11.63 w150 58 16.19 5914.55W 380030.23 5979971.84 n70 21 14.00 w150 58 27.16 6289.93W 379658.67 5980218.50 n70 21 16.37 wlS0 58 38.14 6529.93W 379421.12 5980376.20 nT0 21 17.88 wlSO 58 45.16 6665.31W 379287.12 5980465.16 nT0 21 18.74 wlS0 58 49.12 6995.01W 378960.77 5980681.80 n70 21 20.81 wlS0 58 58.76 7040.69W 378915.56 5980711.81 nT0 21 21.10 w150 59 00.09 7416.07W 378544.00 5980958.47 n70 21 23.47 w150 59 11.07 7791.45W 378172.45 5981205.13 nT0 21 25.84 w150 59 22.05 8166.82W 377800.89 5981451.78 n70 21 28.20 wlSO 59 33.03 8190.95W 377777.01 5981467.63 n70 21 28.35 wlSO 59 33.74 8501.56W 377469.56 5981671.73 n70 21 30.31 wlSO 59 42.82 8542.20W 377429.33 5981698.44 n70 21 30.57 w150 59 44.01 8654.34W 377318.34 5981772.12 nT0 21 31.27 wlS0 59 47.29 8659.36W 377313.37 5981775.42 nT0 21 31.31 wlS0 59 47.44 8719.15W 377254.19 5981814.71 nT0 21 31.68 w150 59 49.19 8765.66W 377208.15 5981845.27 nT0 21 31.98 wlSO 59 50.55 8793.90W 377180.20 5981863.83 nT0 21 32.15 w150 59 51.37 8871.97W 377102.93 5981915.12 nT0 21 32.65 w150 59 53.66 8917.58W 377057.78 5981945.10 n70 21 32.93 wlS0 59 54.99 9054.68W 376922.08 5982035.18 nT0 21 33.80 wlS0 59 59.00 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordina=es from slot #18 and TVD from RKB (Doyon 19) (56.00 Ft above mean sea level). Bottom hole distance is 10923.73 on azimuth 304.01 degrees from wellhead. Total Dogleg for wellpath is 67.71 degrees. Vertical section is from wellhead on azimuth 304.07 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ATTACHMENT 5 Phillips Alaska, Inc. CD~i,18PH Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : CD1-18 PH Vers#3 Last revised : 5-Mar-2001 Co~nents in wellpath MD TVD Rectangular Coords. Comment 250.00 250.00 0.00S 0.00E KOP 750.00 747.47 39.44N 18.39W Build 3/100 1058.88 1046.00 110.09N 51.34W West Sak 1183.33 1162.06 150.75N 70.29W Beg Bld/Trn 1631.76 1556.00 325.23N 190.84W Permafrost 2550.32 2181.00 747.81N 699.18W C-40 2673.81 2240.18 807.33N 789.74W EOC 3027.41 2400.00 977.67N 1055.21W 9 5/8' Casing Pt. 3040.68 2406.00 984.07N 1065.17W C-30 3815.04 2756.00 1357.11N 1646.53W C-20 6071.75 3776.00 2444.25N 3340.77W K-3 6226.62 3846.00 2518.86N 3457.04W K-2 10319.675696.00 4490.64N 6529.93W Albian-97 10939.165976.00 4789.07N 6995.01W Albian-96 12532.136696.00 5556.47N 8190.95W HRZ 12945.866883.00 5755.78N 8501.56W K-1 13156.056978.00 5857.03N 8659.36W LCU 13235.697014.00 5895.40N 8719.15W Miluveach A 13297.647042.00 5925.24N 8765.66W Alpine D 13335.267059.00 5943.36N 8793.90W PH Tgt/Alpine 13439.247106.00 5993.45N 8871.97W B/AiDine/UJU 13682.617216.00 6110.70N 9054.68W TD Casing positions in string 'A' mmmmmmmmmmmlmmmlmmmmmmu=mmammm Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords; Casing. 0.00 0.00 0.00S 0.00E 3027.41 2400.00 977.67N 1055.20W9 5/8" Casing 0.00 0.00 0.00S 0.00E 13584.30 7171.56 6063.34N 8980.87W 7" Casing Targets associated with this wellpath Target name Geographic Locati'on T.V.D. Rectangular CoordinatesReVised CD1-18 PH Tgt Rvsd 2 7059.00 5943.36N 8793.90W 5-Mar-2001 ,,RECEIVED Alaska 0il & Gas Cons. Commission Anchorage .. ,, ATTACHMENT 5 Phillips Alaska, Inc. CD#i 18PH slot #18 Alpine Field North Slope, Alaska SUMMARY CLEARANCE REPORT Baker Hughes INTEQ Your ref : CD1-18 PH Vets#3 Our ref : prop3019 License : Date printed : 5-Mar-2001 Date created : 27-jun-1998 Last revised : 5-Mar-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on nT0 20 37.100,w150 56 46.041 Slot location is n70 20 33.724,w150 55 34.323 Slot Grid coordinates are N 5975784.950, E 385879.881 Slot local coordinates are 342.87 S 2454.94 E Projection ty~e: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Object wellpath CDi-15 Version #2,,15,CD#1 PMSS <0-10548'~,,19,CD#1 PMSS (2827 - 11956'>,,19A,CD#1 PMSS 410803-13706'>,,24,CD#1 PMSS 40-9357'~,,16PH1,CD#1 PMSS (8393 - 12600'>,,16,CD#1 PMSS (7182 - 11170'>,,41,CD#1 PMSS (475 - 8166'>,,41PH1,CD#1 PMSS (9081 - 12811'>,,44,CD#1 PMSS <297 - 9882'>,,44PHi,CD#1 PMSS 4476 - 11190'>,,34,CD#1 PMSS (0-10897'>,,3,CD#1 PMSS <0-8350'>,,26PHi,CD#1 PMSS 47755-11134'>,,26,CD#1 PMSS (0-8844'>,,45PHi,CD#1 PMSS <7950-11950'>,,45,CD#1 PMSS <0-11608'>,,42,CD#1 PMSS (0-12921'>,,43,CD#1 PMSS <832 - 12147'>,,25,CD#1 PMSS 4384 - 14477'>,,23,CD#1 PGMS (0710255'>,,WD2,CD#1 PMSS (0-7331'>,,1PHI,CD#1 PMSS <5946 - 10289'>,,1,CD#1 PMSS 4563-13977'~,,4,CD#1 PMSS 40-11492'~,,27,CD#1 PMSS <565 - 9505'>,,30PHi,CD#1 PMSS (8965 - 12850'>,,30,CD#1 PMSS (10013' - 14353'>,,32,CD#1 PMSS 40-11067'>,,32PH1,CD#1 PMSS 40-11693'>,,10,CD#1 PMSS <562 - 12134'>,,37,CD#1 PMSS <654 - 10956'~,,38PB1,CD#l PMSS (9876 - 12240'>,,38,CD#1 PMSS 40-10224'>,,39PHi,CD#1 PMSS 49146 - 13289'~,,39,CD#1 ~MSS 40-12055'~,,40,CD#1 PMSS (656 - 7210'),,28PHI,CD#1 PMSS 46549 - 10468'm,,28,CD#1 PMSS (507 - 10854'~,,33,CD#1 PGMS (0 - 8050'>,,22,CD#1 PMSS <8091 - 8372'>,,22,CD#1 PMSS <8464 - 11500'>,,22A,CD#1 PMSS <472 - 1545'~,,36PH1,CD#1 Closes= approach with 3-D Minimum Distance method Last revised Distance M.D. Diverging from M.D. 5-Apr-2000 27.9 500.0 500.0 6-Apr-2000 9.9 100.0 100,0 30-Apr-2000 9.9 100.0 100.0 7-Aug-2000 60.2 0.0 0.0 4-Jan-2000 19.9 100.0 100.0 25-Oct-1999 19.9 100.0 100.0 3-Apr-2000 229.9 100.0 8520.0 26-Mar-2000 229.9 100.0 100.0 23-May-2000 260.3 100.0 9740.0 23-May-2000 260.3 100.0 100.0 11-May-2000 160.1 200.0 13297.6 4-Jan-2000 149.2 412.5 412.5 6-Mar-2000 80.4 100.0 100.0 1-Nov-1999 80.4 100.0 100.0 4-Jan-2000 270.1 200.0 200.0 ~6-Nov-1999 270.1 200.0 200.0 23-Dec-1999 240.2 100.0 8980.0 27-Oct-2000 250.5 100.0 100.0 15-Mar-2000 69.8 275.0 275.0 29-Aug-2000 49.7 300.0 300.0 28-Jun-1999 1021.9 1544.4 1544.4 29-Feb-2000 169.4 250.0 250.0 27-Jun-1999 169.4 250.0 6500.0 15-Nov-2000 139.8 100.0 100.0 16-Mar-2000 90.1 200.0 200.0 25-Sep-2000 120.2 100.0 100.0 1-0ct-2000 120.2 100.0 11600.0 14-Dec-2000 140.0 262.5 12920.0 4-Jan-2000 140.0 262.5 262.5 8-Dec-2000 68.5 712.5 712.5 26-Aug-1999 190.2 0.0 0.0 13-Feb-2000 199.8 200.0 200.0 14-Feb-2000 199.8 200.0 200.0 4-Jan~2000 210.1 100.0 100.0 22-Sep-1999 210.1 100.0 100.0 5-Sep-2000 220.2 100.0 100.0 17-Dec-2000 97.7 362.5 362.5 22-Dec-2000 97.7 362.5 362.5 5-Jan-2001 150.1 0.0 262.5 13-Nov-2000 40.4 100.0 100.0 13-Nov~2000 40.4 100.0 100.0 13-Nov-2000 40.4 100.0 100.0 4-Jan-2000 180.2 100.0 100.0 ATTACHMENT 5 Phillips Alaska, Inc. , CD#1 18 slot #18 . Alpine Field .North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : CD1-18 Vets#3 Our ref : prop3519 'License : Date printed : 5-Mar-2001 Date created : 10-Aug-1999 Last revised : 5-Mar-2001 Field is centred on n70 20 37.100,w150 51 37.53' Structure is centred on n70 20 37.100,w150 56 46.041 .. Slot location is nT0 20 33.724,w150 5534.323 Slot Grid coordinates are N'5975784.950, E 385879.881 Slot local coordinates are 342~87 S 2454.94 E Projection type: alaska- Zone 4, Spheroid: Clarke -1866 · Reference North is True North ,, RECEIVED MflR 0 9 ZOO1 Alaska Oil & Gas Cons. Commission Anchorage, , ATTACHMENT 5 Phillips Alaska, Inc. CD#1,18 Alpine Field, North Slope, Alaska PROPOSAL LISTING Page 1 Your ref : CDi-18 Vers#3 Last revised : 5-Mar-2001 Measured Inclin. Azimuth True Vert R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100ft Sect 0.00 0.00 0.00 0.00 0.00 S 0.00 E 0.00 0.00 100.00 0.00 335.00 100.00 0.00 S 0.00 E 0.00 0.00 200.00 0.00 335.00 200.00 0.00 S 0.00 E 0.00 0.00 250.00 0.00 335.00 250.00 0.00 S 0.00 E 0.00 0.00 350.00 2.00 335.00 349.98 1.58 N 0.74 W 2.00 1.74 450.00 4.00 335.00 449.84 6.32 N 2.95 W 2.00 6.97 550.00 6.00 335.00 549.45 14.22 N 6.63 W 2.00 15.67 650.00 8.00 335.00 648.70 25.27 N 11.78 W 2.00 27.84 750.00 10.00 335.00 747.47 39.44 N 18.39 W 2.00 43.46 816.67 12.00 335.00 812.90 50.97 N 23.77 W 3.00 56.16 916.67 15.00 335.00 910.13 72.13 N 33.63 W 3.00 79.47 1016.67 18.00 335.00 1006.00 97.87 N 45.64 W 3.00 107.83 1116.67 21.00 335.00 1100.25 128.12 N 59.74 W 3.00 141.16 1183.33 23.00 335.00 1162.06 150.75 N 70.29 W 3.00 166.10 1200.00 23.37 334.15 1177.38 156.67 N 73.11 W 3.00 172.65 1300.00 25.68 329.52 1268.37 193.20 N 92.76 W 3.00 214.13 1400.00 28.11 325.63 1357.55 231.33 N 117.05 W 3.00 259.20 1500.00 30.63 322.32 1444.70 270.94 N 145.93 W 3.00 307.74 1600.00 33.23 319.47 1529.56 311.94 N 179.31 W 3.00 359.61 1700.00 35.88 317.00 1611.92 354.20 N 217.11 W 3.00 414.69 1800.00 38.58 314.83 1691.54 397.63 N 259.22 W 3.00 472.81 1900.00 41.31 312.90 1768.20 442.08 N 305.52 W 3.00 533.81 2000.00 44.07 311.17 1841.70 487.45 N 355.89 W 3.00 597.54 2100.00 46.86 309.60 1911.83 533.61 N 410.19 W 3.00 663.80 2200.00 49.66 308.17 1978.41 580.43 N 468.28 W 3.00 732.43 2300.00 52.48 306.86 2041.24 627.79 N 529.98 W 3.00 803.24 2400.00 55.32 305.64 2100.15 675.55 N 595.14 W 3.00 876.02 2500.00 58.16 304.51 2155.00 723.58 N 663.57 W 3.00 950.58 2600.00 61.02 303.44 2205.61 771.76 N 735.09 W 3.00 1026.72 2673.81 63.13 302.69 2240.18 807.33 N 789.74 W 3.00 1083.82 3000.00 63.13 302.69 2387.61 964.47 N 1034.63 W 0.00 1337.63 3500.00 63.13 302.69 2613.61 1205.34 N 1410.01 W 0.00 1726.68 4000.00 63.13 302.69 2839.60 ' 1446.21 N 1785.39 W 0.00 2115.74 4500.00 63.13 302.69 3065.59 1687.08 N 2160.77 W 0.00 2504.80 5000.00 63.13 302.69 3291,58 1927.95 N 2536.14 W 0.00 2893.85 5500.00 63.13 302.69 3517.58 2168.82 N 2911.52 W 0.00 3282.91 6000.00 63.13 302.69 3743.57 2409.69 N 3286.90 W 0.00 3671.97 6500.00 63.13 302.69 3969.56 2650,55 N 3662.28 W 0.00 4061.02 7000.00 63.13 302.69 4195.55 2891.42 N 4037.66 W 0.00 4450.08 7500.00 63.13 302.69 4421.55 3132.29 N 4413.04 W 0.00 4839.14 8000.00 63.13 302,69 4647.54 3373'.16 N 4788.42 W 0.00 5228.20 8500.00 63.13 302.69 4873.53 3614;03 N 5163.80 W 0.00 5617.25 9000.00 63.13 302.69 5099.53 3854.90 N 5539.17 W 0.00 6006.31 9500.00 63.13 302.69 5325.52 4095.77 N 5914.55 W 0.00 6395.37 10000.00 63.13 302.69 5551.51 4336.64 N 6289.93 W 0.00 6784.42 10500.00 63.13 302.69 5777.50 4577.51 N 6665.31 W 0.00 7173.48 11000.00 63.13 302.69 6003.50 4818.38 N 7040.69 W 0.00 7562.54 11500.00 63.13 302.69 6229.49 5059.25 N 7416.07 W 0.00 7951.59 12000.00 63.13 302.69 6455.48 5300.12 N 7791.45 W 0.00 8340.65 12500.00 63.13 302.69 6681.48 5540.99 N 8166.83 W 0.00 8729.71 All data is in feet unless otherwise stated. Coordinates from slot %18 and TVD from ~ (Doyon 19) (56.00 F~ above mean sea level), Bottom hole distance is 14915.52 on azimuth 312.43 degrees from wellhead. Total Dogleg for wellpath is 106.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.96 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ATTACHMENT 5 Phillips Alaska, Inc. CD#1,18 Alpine Field, North Slope, Alaska Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth 13000.00 63.13 302.69 6907.47 13149.36 63.13 302.69 6974.98 13156.09 63.51 303.21 6978.00 13200.00 66.06 306.55 6996.71 13245.01 68.75 309.83 7014.00 13300.00 72.11 313.69 7032.42 13333.03 74.17 315.93 7042.00 13400.00 78.41 320.34 7057.88 13400.61 78.45 320.38 7058.00 13500.00 84.85 326.70 7072.45 13584.28 90.32 331.96 7076.00 13584.30 90.32 331.96 7076.00 13600.00 90.32 331.96 7075.91 13700.00 90.32 331.96 7075.35 13800.00 90.32 331.96 7074.78 13900.00 90.32 331.96 7074.21 14000.00 90.32 331.96 7073.65 14100.00 90.32 331.96 7073.08 14200.00 90.32 331.96 7072.52 14300.00 90.32 331.96 7071..95 14400.00 90.32 331,96 7071.39 14500.00 90.32 331.96 7070.82 14600.00 90.32 331.96 7070.26 14700.00 90.32 331.96 7069.69 14800.00 90.32 331.96 7069.13 14900.00 90.32 331.96 7068.56 15000.00 90.32 331.96 7067.99 15100.00 90.32 331.96 7067.43 15200.00 90.32 331.96 7066.86 15300.00 90.32 331.96 7066.30 15400.00 90.32 331.96 7065.73 15500.00 90.32 331.96 7065.17 15600.00 90.32 331.96 7064.60 15700.00 90.32 331.96 7064.04 15800.00 90.32 331.96 7063.47 15900.00 90.32 331.96 7062.90 16000.00 90.32 331.96 7062.34 16100.00 90.32 331.96 7061.77 16200.00 90.32 331.96 7061.21 16300.00 90.32 331.96 7060.64 16400.00 90.32 331.96. 7060.08 16500.00 90.32 331.96 7059.51 16600.00 90.32 331.96 7058.94 16700.00 90.32 331.96 7058.38 16800.00 90.32 331.96 7057.81 16900.00 90.32 331.96' 7057.25 17000.00 90.32 331.96 7056.68 17100.00 90.32 331.96 7056.12 17200.00 90.32 331.96 7055.55 17300.00 90.32 331.96 7054.99 PROPOSAL LISTING Page 2 Your ref : CD1-18 Vets#3 Last revised : 5-Mar-2001 R E C T A N G U L A R Dogleg C 0 0 R D I N A T E S Deg/100ft 5781.85 N 8542.20 W 0.00 5853.81 N 8654.34 W 0.00 5857.08 N 8659.39 W 9.00 5879.80 N 8691.96 W 9.00 5905.49 N 8724.60 W 9.00 5940.00 N 8763.23 W 9.00 5962.28 N 8785.65 W 9.00 6010.72 N 8829.03 W 9.00 6011.19 N 8829.41 W 9.00 6090.22 N 8887.75 W 9.00 6162.60 N. 8930.66 W 9.00 6162.61 N 8930.67 W 9.00 6176.47 N 8938.05 W 0.00 6264.73 N 8985.06 W 0.00 6352.99 N 9032.08 W 0.00 6441.25 N 9079.09 W 0.00 6529.51 N 9126.10 W 0.00 6617.77 N 9173.11 W 0.00 6706.03 N 9220.12 W 0.00 6794.28 N 9267.13 W 0.00 '6882.54 N 9314.14 W 0.00 6970.80 N 9361.15 W 0.00 7059.06 N 9408.16 W 0.00 7147.32 N 9455.17 W 0.00 7235.58 N 9502.18 W 0.00 7323.84 N 9549.19 W. 0.00 7412.10 N ' 9596.20 W 0.00 7500.36 N ' 9643.21 W 0.00 7588.62 N 9690.22 W . 0.00 7676.88 N 9737.23 W 0.00 7765.14 N 9784.24 W 0.00 7853.40 N 9831.25 W ~ 0.00 7941.66 N 9878.26 W 0.00 8029.92 N 9925.27 W 0.00 8118.18 N 9972.28 W 0.00 8206.44 N 10019.29 W 0.00 8294.70 N 10066.30 W 0.00 8382.96 N 10113.31 W 0.00 8471.22 N . 10160.32 W 0.00 8559.48 N 10207.33 W 0.00 8647.74 N 10254.34 W 0.00 8736.00 N 10301.34 W 0.00 8824.26 N 10348.35.W 0.00 8912.52 N 10395.36 W 0.00 9000.78 N 10442.37 W 0.00 9089.04 N 10489.38 W 0.00 9177.30 N 10536.39 W 0.00 9265.56 N 10583.40 W 0.00 9353.82 N 10630.41 W 0.00 9442.08 N 10677.41 W 0.00 Vert Sect 9118.77 9234.98 KOP Beg Fnl Bld/Trn 9240.25 LCU 9275.61 9313.64Miluveach A 9362.25 9392.45 Alpine D 9455.60 9456.19 Alpine 9553.37 9637.42 9637.44 9653.14 9753.14 9853.14 9953.14 10053.14 10153.14 10253.14 10353.13. 10453.13 10553.13 10653.13 10753.13 10853.13 10953.12 11053.12 11153.12. 11253.12 11353.12 11453.12 11553.11 11653.11 11753.11 11853.11 11953.11 12053.11 12153.10 12253.10 12353.10 12453.10 12553.10 12653.10 12753.10 12853.09 12953.09 13053.09 13153.09 13253.09 13353.09 Tgt - Csg Pt.-EOC RECEIVED 4AR 0 9 'Z001 Alaska Oil & Gas Cons. Commission Anchorage All data is in feet unless otherwise stated. Coordinates from slot #18 and TVD from RKB (Doyon 19) (56.00 Ft above mean sea level). Bottom hole distance is 14915.52 on azimuth 312.43 degrees from wellhead. Total Dogleg for wellpath is 106.86 degrees. Vertical section is from S 0..00 E 0.00 on azimuth 331.96 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ATTACHMENT 5 Phillips Alaska, Inc. CD#l,18 Alpine Field, North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees DeDth C O O R D I N A T E S 17400.00 90.32 331.96 7054.42 9530.34 N 10724.42 W 17500.00 90.32 331.96 7053.85 9618.60 N 10771.43 W 17600.00 90.32 331.96 7053.29 9706.86 N 10818.44 W 17700.00 90.32 331.96 7052.72 9795.12 N 10865.45 W 17800.00 90.32 331.96 7052.16 9883.38 N 10912.46 W 17900.00 90.32 331.96 7051.59 9971.64 N 10959.46 W 18000.00 90.32 331.96 7051.03 10059.90 N 11006.47 W 18004.56 90.32 331.96 7051.00 10063.93 N 11008.61 W 18004.58 90.32 331.96 7051.00 10063.95 N 11008.63 W PROPOSAL LISTING Page 3 Your ref : CDi-18 Vets#3 Last revised : 5-Mar-2001 Dogleg Vert Deg/100ft Sect 0.00 13453.08 0.00 13553.08 0.00 13653.08 0.00 13753.08 0.00 13853.08 0.00 13953.08 0.00 14053.07 0.00 14057.63 TD 0.00 14057.66 CDi-18 TD Rvsd 15-Feb-01 All data is in feet un~ess otherwise stated. Coordinates from.'slot #18 and TVD from RKB (Doyon 19) (56.00 Ft above mean sea level). Bottom hole distance is 14915.52 on azimuth 312.43 degrees from wellhead. Total Dogleg for wellpath is 106.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.96 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ATTACHMENT 5 Phillips Alaska, Inc. CD#1,18 Alpine Field, North Slope, Alaska PROPOSAL LISTING Page 4 Your ref : CD1-18 Vets#3 Last revised : 5-Mar-2001 Comments in wellpath MD TVD Rectangular Coords. Comment 13149.36 6974.98 5853.81 N 8654.34 W KOP Beg Fnl Bld/Tr~ 13156.09 6978.00 5857.08 N 8659.39 W LCU 13245.01 7014.00 5905.49 N 8724.60 W Miluveach A 13333.03 7042.00 5962.28 N 8785.65 W Alpine D 13400.61 7058.00 6011.19 N 8829.41 W Alpine 13584.28 7076.00 6162.60 N 8930.66 W Tgt- Csg Pt.-EOC 18004.56 7051.00 10063.93 N 11008.61 W TD 18004.58 7051.00 10063.95 N 11008.63 W CD1-18 TD Rvsd 15-Feb-01 Casing positions in string 'A' Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 3027.41 2400.00 . 977.67N 1055.20W 9 5/8" Casing 0.00 0.00 0.00S 0.00E 13584.30 7076.00 6162.61N 8930.67W 7" Casing Targets associated with this we11Dath Target name Geographic Location T.V.D. Rectangular Coordinates Revised CD1-18 TD Rvsd 15-Fe 375030.000,5986018.000,0.0000 7051.00 10063.95N 11008.63W 20-Feb,2001 RECEIVED M/ R 0 9 ZOO1 Alaska Oil & Gas Cons. Commission Anchorage ATTACHMENT 5 Phillips Alaska, Inc. CD#1 18 slot #18 Alpine Field North Slope, Alaska PROPOSAL LISTING Baker Hughes INTEQ Your ref : CD1-18 Vets#3 Our ref : prop3519 License : Date printed : 5-Mar-2001 Date created : 10-Aug-1999 Last revised : 5-Mar-2001 Field is centred on nT0 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w150 56 46.041 Slot location is n70 20 33.724,w150 55 34.323 Slat Grid coordinates are N 5975784.950, E 385879.881 Slot local coordinates are 342.87 S 2454.94 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ATTACHMENT 5 Phillips Alaska, Inc. CD#1,18 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 1 Your ref : CD1-18 Vets#3 Last revised : 5-Mar-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O 0 R D S G E 0 G R A P H I Depth Degrees De~rees Depth C 00 R D I N A T E S Easting Northing C O O R D I N A T 0.00 0.00 0.00 0.00 0.00S 0.00E 385879.88 5975784.95 nT0 20 33.72 w150 100.00 0.00 335.00 100.00 0.00S 0.00E 385879.88 5975784.95 n70 20 33.72 w150 200.00 0.00 335.00 200.00 0.00S 0.00E 385879.88 5975784.95 n70 20 33.72 wlS0 250.00 0.00 335.00 250.00 0.00S 0.00E 385879.88 5975784.95 n70 20 33.72 w150 350.00 2.00 335.00 349.98 1.58N 0.74W 385879.17 5975786.54 n70 20 33.74 w150 450.00 4.00 335.00 449.84 6.32N 2.95W 385877.03 5975791.32 nT0 20 33.79 w150 550.00 6.00 335.00 549.45 14.22N 6.63W 385873.47 5975799.27 n70 20 33.86 w150 650.00 8.00 335.00 648.70 25.27N 11.78W 385868.49 5975810.40 nT0 20 33.97 wlS0 750.00 10.00 335.00 747.47 39.44N 18.39W 385862.10 5975824.67 nT0 20 34.11 w150 816.67 12.00 335.00 812.90 50.97N 23.77W 385856.91 5975836.28 nT0 20 34.23 w150 916.67 15.00 335.00 910.13 72.13N 33.63W 385847.38 5975857.59 n70 20 34.43 w150 1016.67 18.00 335.00 1006.00 97.87N 45.64W 385835.78 5975883.50 nT0 20 34.69 w150 1116.67 21.00 335.00 1100.25 128.12N 59.74W 385822.14 5975913.97 n70 20 34.98 w150 1183.33 23.00 335.00 1162.06 150.75N 70.29W 385811.94 5975936.76 n70 20 35.21 wlS0 1200.00 23.37 334.15 1177.38 156.67N 73.11W 385809.22 5975942.73 n70 20 35.27 w150 1300.00 25.68 329.52 1268.37 193.20N 92.76W 385790.15 5975979.55 n70 20 35.62 w150 1400.00 28.11 325.63 1357.55 231.33N 117.05W .385766.45 5976018.05 n70 20 36.00 w150 1500.00 30.63 322.32 1444.70 270.94N 145.93W 385738.20 5976058.10 n70 20 36.39 w150 1600.00 33.23 319.47 1529.56 311.94N 179.31W 385705.46 5976099.61 nT0 20 36.79 w150 1700.00 35.88 317.00 1611.92 354.20N 217.11W 385668.32 5976142.46 n70 20 37.21 w150 1800.00 38.58 314.83 1691.54 1900.00 41.31 312.90 1768.20' 2000.00 44.07 311.17 1841.70 2100.00 46.86 309.60 1911.83 2200.00 49.66 308.17 1978.41 2300.00 52.48 2400.00 55.32 2500.00 58.16 2600.00 61.02 2673.81 63.13 306.86 2041.24 305.64 2100.15 304.51 2155.00 303.44 2205.61 302.69 2240.18 397.63N 259.22W 385626.90 5976186.52 nT0 20 37.64 w150 442.08N 305.52W 385581.30 5976231.69 nT0 20 38.07 w150 487.45N 355.89W 385531.64 5976277.84 nT0 20 38.52 w150 533.61N 410.19W 385478.07 5976324.83 nT0 20 38.97 w150 580.43N. 468.28W 385420.73 5976372.54 n70 2039.43 w150 627.79N 529.98W 385359.77 5976420.85 nT0 20 39.90 w150 675.55N 595.14W '385295.37 5976469.61 n70 20 40.37 w150 723.58N 663.57W 385227.70 5976518.70 n70 20 40.84 w150 771.76N 735.09W 385156.95 5976567.98 nT0 20 41.32 w150 807.33N 789.74W 385102.85 5976604.40 n70 20 41.67 w150 3000.00 63.13 302.69 2387.61 3500.00 63.13 302.69 2613.61 4000.00 63.13 302.69 2839.60 4500.00 63.13 302.69 3065.59 5000.00 63.13 302.69 3291.58 5500.00 63.13 302.69 3517.58 6000.00 63.13 302.69 3743.57 6500.00 63.13 302.69 3969.56 7000.00 63.13 302.69 4195.55 7500.00 63.13 302.69 4421.55 8000.00 63.13 302.69 4647.54 8500.00 63.13 302.69 4873.53 9000.00 63.13 302.69 5099.53 9500.00 63.13 302.69 5325.52 10000.00 63.13 302.69 5551.51 10500.00 63.13 302.69 5777.50 11000.00 63.13 302.69 6003.50 11500.00 63.13 302.69 6229.49 12000.00 63.13 302.69 6455.48 12500.00 63.13 302.69 6681.48 964.47N 1205.34N I446.21N 1687.08N 1927.95N 2168.82N 2409.69N 2650.55N 2891.42N 3132.29N 3373.16N 3614.03N 3854.90N 4095.77N 4336.64N 4577.51N 4818.38N 5059.25N 5300.12N 5540.99N 1034.63W 384860.46 5976765.31 n70 20 43.21 w150 1410.01W 384488.90 5977011.96 n70 20 45.58 w150 1785.39W 384117.35 5977258.62 n70 20 47.95 w150 2160.77W 383745.79 5977505.28 nT0 20 50.32 w150 2536.14W 383374.24 5977751.93 n70 20 52.69 w150 .. 2911.52W 383002.68 5977998.59 n70 20 55.06 w150 3286.90W 382631.12 5978245.25 nT0 20 57.43 w150 3662.28W 382259.57 5978491.90 n70 20 59.79 w150 4037.66W 381888.01 5978738.56 nT0 21 02.16 w150 4413.04W. 381516.45 5978985.22 n70 21 04.53 w150 _ 4788.42W 381144.90 5979231.87 n70 21 06.90 wi50 5163.80W 380773.34 5979478.53 n70 21 09.27. w150 5539.17W 380401.78 5979725.19 n70 21 11.63 w150 5914.55W 380030'..23 5979971.84 nT0 21 14.00 w150 6289.93W 379658.67 5980218.50 n70 21 16.37 w150 6665.31W 379287.12 5980465.16 nT0 21 18.74 w150 7040.69W 378915.56 5980711.81 nT0 21 21.10 w150 7416.07W 378544.00 5980958.47 n70 21 23.47 w150 7791.45W 378172.45 5981205.13 n70 21 25.84 wlS0 8166.83W 377800.89 5981451.78 nT0 21 28.20 w150 C ES 55 34.32 55 34.32 55 34.32 55 34.32 55 34.34 55 34.41 55 34.52 55 34.67 55 34.86 55 35.02 55 35.30 55 35.66 55 36.07 55 36.38 55 36.46 55 37.03 55 37.74 55 38.58 55 39.56 55 40.66 55 41,89 55 43.24 55 44.72 55 46.30 55 48.00 55 49.80 55 51.70 55 53.70 55 55.79 55 57.39 ~6 04.54 56 15.51 56 26.48 56 37.45 56 48.41 56 59.38 57 10.35 57 21.32 57 32.30 57 43.27 57 54.24 58 05.22 58 16.19 58 27.16 58 38.14 58 49.12 59 00.09 59 11.07 59 22.05 59 33.03 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #18 and TVD from RKB (Doyon 19} (56.00 Ft above mean sea level). Bottom hole distance is 14915.52 on azimuth 312.43 degrees from wellhead. Total Dogleg for wellpathis 106.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.96 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ '. · RECEIVED MAR 0 9 ZOQ]' Alaska Oil & Gas Cons. Commission ^nchora~e , . ATTACHMENT 5 Phillips Alaska, Inc. CD#l,18 Alpine Field, North Slope, Alaska Measured Inclin Azimuth True VertR E C T A N G U L A R Depth Degrees Degrees Depth C 0 0 R D I N A T E S 13000.00 63.13 302.69 6907.47 5781.85N 8542.20W 13149.36 63.13 302.69 6974.98 5853.81N 8654.34W 13156.09 63.51 303.21 6978.00 5857.08N 8659.39W 13200.00 66.06 306.55 6996.71 5879.80N 8691.96W 13245.01 68.75 309.83 7014,00 5905.49N 8724.60W 13300.00 72.11 313.69 7032.42 5940.00N 8763.23W 13333.03 74.17 315.93 7042.00 5962.28N 8785.65W 13400.00 78.41 320.34 7057.88 6010.72N 8829.03W 13400.61 78.45 320.38 7058.00 6011.19N 8829.41W 13500.00 84.85 326.70 7072.45 6090.22N 8887.75W 13584.28 90.32 331.96 7076.00 6162.60N 8930.66W 13584.30 90.32 331.96 7076.00 6162.61N 8930.67W 13600.00 90.32 331.96 7075.91 6176.47N 8938.05W 13700.00 90.32 331,96 7075.35 6264.73N 8985.06W 13800.00 90.32 331.96 7074.78 6352.99N 9032.08W 13900.00 90.32 331.96 7074.21 6441.25N 9079.09W 14000.00 90.32 331.96 7073.65 6529.51N 9126.10W 14100.00 90.32 331.96 7073.08 6617.77N 9173.11W 14200.00 90.32 331.96 7072.52 6706.03N 9220.12W 14300.00 90.32 331.96 7071.95 6794,28N 9267.13W 14400.00 90.32 331.96 7071.39 6882.54N 9314.14W 14500.00 90.32 331.96 7070.82 6970.80N 9361.15W 14600.00 90.32 331.96 7070.26 7059.06N 9408,16W 14700.00 90.32 331.96 7069,69 7147.32N 9455.17W 14800.00 90.32 331.96 7069.13 7235.58N 9502.18W 14900.00 90.32 331.96 7068.56 7323.84N 9549.19W 15000.00 90.32 331.96 7067.99 7412.10N 9596.20W 15100.00 90.32 331.96 7067.43 7500.36N 9643.21W 15200.00 90.32 331.96 7066.86 7588.62N 9690.22W 15300.00 90.32 331.96 7066.30 7676.88N 9737.23W 15400.00 90.32 331.96 7065.73 7765.14N 9784.24W 15500.00 90.32 331.96 7065.17 7853.40N 9831.25W 15600.00 90.32 331.96 7064.60 7941.66N 9878.26W 15700.00 90.32 331.96 7064.04 8029.92N 9925.27W 15800.00 90.32 331.96 7063.47 8118.18N 9972.28W 15900.00 90.32 331.96 7062.90 8206.44N 10019.29W 16000.00 90.32 331.96 7062.34 8294.70N 10066.30W 16100.00 90.32 331.96 7061.77 8382.96N 10113.31W 16200.00 90.32 331.96 7061.21 8471.22N 10160.32W 16300.00 90.32 331.96 7060.64 8559.48N 10207.33W 16400.00 90.32 331.96 7060.08 8647.74N 10254.34W 16500,00 90,32 331.96 7059,51 8736.00N 10301.34W 16600,00 90.32 331,96 7058.94 8824.26N 10348.35W 16700.00 90.32 331.96 7058.38 8912.52N 10395.36W 16800.00 90.32 331.96 7057.81 9000.78N 10442.37W 16900.00 90.32 331.96 7057.25 9089.04N 10489.38W 17000.00 90.32 331.96 7056.68 9177.30N 10536.39W 17100.00 90.32 331,96 7056.12 9265.56N 10583.40W 17200.00 90.32 331.96 7055.55 9353.82N 10630,41W 17300.00 90.32 331,96 7054.99 9442.08N 10677.41W PROPOSAL LISTING Page 2 Your ref : CDi-18 Vets#3 Last revised : 5-Mar-2001 GRID COO RD S GEOGRAPHIC Easting Northing C O O R D I N A T E S 377429.33 5981698.44 n70 21 30.57 w150 59 44.01 377318.34 5981772.12 n70 21 31.27 w150 59 47.29 377313.35 5981775.47 n70 21 31.31 w150 59 47.44 377281.13 5981798.69 n70 21 31.53 w150 59 48.39 377248.89 5981824.89 n70 21 31.78 w150 59 49.35 377210.81 5981859.99 nT0 21 32.12 w150 59 50.48 377188.74 5981882.61 n70 21 32.34 w150 59 51.13 377146.12 5981931.72 n70 21 32.82 wlS0 59 52.40 377145.75 5981932.19 n70 21 32.82 w150 59 52.41 377088.65 5982012.11 n70 21 33.60 w150 59 54.12 377046.87 5982085.14 n70 21 34.31 w150 59 55.38 377046.87 5982085.16 n70 21 34.31 w150 59 55.38 377039.70 5982099.13 n70 21 34.45 w150 59 55.59 376994.07 5982188.10 n70 21 35.31 w150 59 56.97 376948.44 5982277.07 n70 21 36.18 w150 59 58.35 376902.81 5982366.04 n70 21 37.05 w150 59 59.72 376857.19 5982455.02 n70 21 37.92 w151 0 01.10 376811.56 5982543.99 n70 21 38.78 w151 0 02.48 376765.93 5982632.96 nT0 21 39.65 w151 0 03.85 376720.30 5982721,93 n70 21 40.52 w151 0 05.23 376674.67 5982810.90 n70 21 41.39 w151 0 06.61 376629.04 5982899.88 n70 21 42.25 w151 0 07.99 376583.41 5982988.85 n70 21 43.12 w151 0 09.36 376537.79 5983077.82 n70 21 43.99 w151 0 10.74 376492.16 5983166.79 nT0 21 44.86 w151 0 12.12 376446.53 5983255,76 n70 21, 45.72w151 0 13.49 376400.90 5983344.74 n70 21 46.59 w151 0 14.87 376355.27 5983433.71 n70 21 47.46 w151 0 16.25 376309.65 5983522.68 nT0 21 48.33 w151 0 17.62 376264.02 5983611.65 nT0 21 49.19 w151 0 19.00 376218.39 5983700.63 nT0 21 50.06 w151 0 20.38 376172.76 5983789.60 n70 21 50.93 w151 0 21.76 376127.13 5983878.57 n70 21 51.80 w151 0 23.13 376081.51 5983967.54 nT0 21 52.66 w151 0 24.51 376035.88 5984056.52 nT0 21 53.53 w151 0 25.89 375990.25 5984145.49 nT0 21 54.40 w151 0 27.27 375944.62 5984234.46 n70 21 55.27 w151 0 28,64 375899.00 5984323.43 n70 21 56.13 w151 0 30.02 375853.37 5984412.41 n70 21 57.00 w151 0 31.40 375807.74 5984501.38 nT0 21 57.87 w151 0 32.78 375762.12 5984590.35 nT0 21 58.74 w151 0 34.15 375716.49 5984679.33 n70 21 59.60 w151 0 35.53 375670.86 5984768.30 nT0 22 00.47 w151 0 36.91 3754525.235984857.27 n70 22 01.34 w151 0 38.29 375579.61 5984946.24 n70 22 02.21 w151 0 39.66 375533.98 5985035.22 nT0 22 03.07 w151 0 41.04 375488.35 5985124.19 nT0 22 03.94 wlS1 0 42.42 375442.73 5985213.16 n70 22 04.81 w151 0 43.80 375397.10 5985302.14 n70 22 05.68 wlS1 0 45.18 375351.47 5985391.11 n70 22 06.55 wlS1 0 46.55 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #18 and TVD from RKB (Doyon 19} (56.00 Ft above raean sea level). Bottom hole distance is 14915.52 on azimuth 312.43 degrees from wellhead. Total Dogleg for wellpath is 106.86 degrees. Vertical section is from S 0,00 E 0.00 on azimuth 331.96 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ATTACHMENT 5 PhilliDs Alaska, Inc. CD#1,X8 Alpine Field°North Slope, Alaska Heasured Inclin Azimuth True Vert Depth Degrees Degrees Depth 17400.00 90.32 331.96 7054.42 9530.34N 17500.00 90.32 331.96 7053.85 9618.60N 17600.00 90.32 331.96 7053.29 9706.86N 17700.00 90.32 331.96 7052.72 9795.12N 17800.00 90.32 331.96 7052.16 9883.38N 17900.00 90.32 331.96 7051.59 9971.64N 18000.00 90.32 331.96 7051.03 10059.90N 18004.56 90.32 331.96 7051.00 10063.93N 18004.$8 90.32 331.96 7051.00 10063.95N RECTANGULAR COORDINATES 10724.42W 10771.43W 10818.44W 10865.45W 10912.46W 10959.46W 11006.47W 11008.61W 11008.63W PROPOSAL LISTING Page 3 Your ref : CD1-18 Vets#3 Last revise~ : 5-14ar-2001 GRID COORD S GEOGRAPHIC Easting Northing C O O R D I N A T E S 375305.85 5985480.08 nT0 22 07.41 w151 0 47.93 375260.22 6985569.06 n70 22 08.28 w151 0 49.51 375214.60 5985668.03 n70 22 09.15 w151 0 50.69 375168.97 5985747.00 nT0 22 10.02 w151 0 62.06 375123.34 5985835.98 n70 22 10.88 w151 0 53.44 375077.72 5986924.95 n70 22 11.76 w151 0 64.82 375032.09 5986013.92 n70 22 12.62 w151 0 56.20 375030.01 5986017.98 n70 22 12.66 w151 0 66.26' 375030.00 5986018.00 n70 22 12.66 w151 0 ~6.26 RECEIVED Alaska Oil & Gas Cons. Commission Anchorage All data in feet unless otherwise stated.. Calculation uses minimum curvature method. Coordinates from slot #18 and TVD from RKB (Doyon 19) (56.00 Ft above mean sea level). Bottom hole distance is 14915.52 on azimuth 312.43 degreesfrom wellhead. . Total Dogleg for wellpa~h is 166.86 degrees. Yertical section is from S 0.00 E 0.00 on azimuth 331.96 degrees. Grid is alaska - Zone 4. Grid.coordinates in FEET and computed using tbs Clarke - 1866 sDheroid Presented by Baker Hughes INTEQ ATTACHMENT 5 Phillips Alaska, Inc. CD#1,18 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 4 Your ref : CD1-18 Vets#3 Last revised : 5-Mar-2001 Coa~nents in wellpath MD TVD Rectangular Coords. Coherent 13149.36 6974.98 5853.81N 8654.34W KOP Beg Fnl Bld/Trn 13156.09 6978.00 5857.08N 8659.39W LCU 13245.01 7014.00 5905.49N 8724.60W Miluveach A 13333.03 7042.00 5962.28N 8785.65W Alpine D 13400.61 7058.00 6011.19N 8829.41W Alpine 13584.28 7076.00 6162.60N 8930.66W Tgt- Csg Pt.-~OC 18004.56 7051.00 10063.93N 11005.61WTD 18004.58 7051.00 10063.95N 11008.63WCD1-18 TD Rvsd 15-Feb-01 Casing positions in string 'A' Top MD TOp TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 3027.41 2400.00 977.67N 1055.20W 9 5/8" Casing 0.00 0.00 0.00S 0.00E 13584.30 7076.00 6162.61N 8930.67W 7" Casing Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised CDi-i$ TD Rvsd 1S-Fo 375030.000,5986018.000,0.0000 7051.00 10063.95N 11008.63W 20-Feb-2001 Phillips Alaska, Inc. CD#1 18PH slot #18 Alpine Field North Slope, Alaska 3-D M I N I M U M D I S T A N C E C L E A R A N C E R E P O R T INCLUDING POSITION UNCERTAINTIES by Baker Hughes INTEQ Your ref : CDi-18 PH Vers#3 Our ref : prop3019 License : Date printed : 5-Mar-2001 Date created : 27-Jun-1998 Last revised : 5-Mar-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w150 56 46.041 Slot location is nT0 20 33.724,w150 55 34.323 "slot Grid coordinates are N 5975784.950, E 385879.881 Slot local coordinates are 342.87 S 2454.94 E Projection ty~e: alaska - Zone 4, Spheroid: Clarke - 1866 .. Reference North is True North Report is limited to clearances less than 500 feet Proximities will incorporate ellipses - when survey tools are defined for both wells. EllipSe.separation. in reverse brackets, e.g. )10.2(, where available. DECREASING CLEARANCES of less than 1000 feet are indicated Object wellpath ~D1-1'5 Version #2,,15,CD#1. PMSS <0-10548'>,,19,CD#1 PMSS <2827 - 11956'>,,19A,CD%1 PMSS <10803-13706'>,,24,CD#1 PMSS <0-9357'>,,16PH1,CD#1 PMSS <8393 - 12600'>,,16,CD#1 PMSS <7182 - 11170'>,,41,CD#1. PMSS <475 ~ 8166'>,,41PH1,CD#1 PMSS <9081 - 12811'>,,44,CD#1 PMSS <297 - 9882'>,,44PHI,CD#1 PMSS <476 - 11190'>,~34,CD#1 PMSS <0-10897'>,,3,CD#1 PMSS. <0-8350'>,,26PH1,CD#1 PMSS <7755-11134'>,,26,CD#1 PMSS <0-8844,>,,45PH1,CD#1 PMSS <7950-11950'>,;45,CD#1 PMSS <0-11608'>,,42,CD#1 PMSS <0-12921'>,,43,CD#1 PMSS <832 z. 12147'>,,25,CD#l PMSS <384 - 14477'>,,23,CD#1 PGMS <0-10255'>,,WD2,CD#1 clOsest approach with 3-D Last revised Distance 5-Apr-2000 6-Apr-2000 30-Apr-2000 7-Aug-2000 4-Jan-2000 25-0ct-1999 3-Apr-2000 26-Mar-2000 23-May-2000 23-May-2000 11-May-2000 4-Jan-2000 6-Mar-2000 1-Nov-1999 4-Jan-2000 16-Nov-1999 23-Dec-1999 27-0ct-2000 15-Mar-2000 29-Aug-2000 28-Jun-1999 )25 1(. )9 2( )9 2( )58 9(. )19 0( )19 0( )228 4( )228 4( )259 6( )259.6( )158.0( )146.8( )79.4( )79.4( )268.9( )268.9( )239.2'( )249.9( )67.4( )47.5( )999.5( by an asterisk, e.g. 487.4* 287.5 200.0 200.0 200.0 200.0 200.0 ' 200.0 262.5 475.0 250.0 250.0 250 0 2.50 0 200 0 100 0 30O 0 350 0 1615 9 Minimum Distance method M.D. Diverging fromM.D. 512.5 512 5 200.0 1191 7. 200.0. 1191 7 287 5 . 200 0 200 0 8600 0 200 0 10160 0 13120 0 13297 6 475 0 250 0 250 0 250 0 ' 250.0 9240.0 12400.0 10320.0 350.0 1615.9 . PMSS <0-7331'>,,1PHi,CD#1 PMSS <5946 - 10289'>,,1,CD#1 PMSS <563-13977'>,,4,CD#1 PMSS <0-11492'>,,27,CD#1 CD1-30 Version#6,,30,CD#l PMSS <565 - 9505'>,,30PH1,CD#l PMSS <8965 - 12850'>,,30,CD#1 PMSS <10013' - 14353'>,,32,CD#1 PMSS <0-11067'>,,32PHi,CD#1 PMSS <0-11693'>,,10,CD#1 PMSS <562 - 12134'>,,37,CD#1 PMSS <654 - 10956'>,,38PB1,CD#l PMSS <9876 - 12240'>,,38,CD#1 PMSS <0-10224'>,,39PHi,CD#1 PM$S <9146 - 13289'>,,39,CD#1 PMSS <0-12055'>,,40,CD#1 CD1-28 Version #8,,28,CD#1 PMSS <656 - 7210'>,,28PHi,CD#1 PMSS <6549 - 10468'>,,28,CD#1 PMSS <507 - 10854'-,,33,CD#1 PGMS <0 - 8050'>,,22,CD#1 PMS$ <8091 - 8372'>,,22,CD#1 PMSS <8464 - l1500'>,,22A,CD#l PMSS <472 - 1545'>,,36PHi,CD#1 PMS$ <763 - 7440'>,,36PH2,CD#l PMSS <6600 - 10654'>,,36,CD#1 PMSS <0-12773'>,,2,CD#1 PMSS <0-10504'>,,5PHi,CD#1 PMS$ <9499 - 14515'~,,5,CD#1 PMSS <0-11300'>,,13,CD#1 PMS$ <473 - 14364'>,,31,CD#1 PMSS <0-13450'>,,35,CD#1 2lA Version #1,,21,CD#1 CD1-21 Version#4,,21,CD#1 PMSS <9794 - 11087'>,,21,CD#1 PMSS <385-8950'>,,21PHi,CD#1 PMSS <8460 - l1782'>,,21PB1,CD#l PMSS IFR <564-18590',,,17,CD#1 PMSS w/IFR <0-16024'~,,6,CD#1 PMSS w/IFR <12632-13308'>,,6PH,CD#l PMSS IFR <0 - 15350'>,,9,CD#1 PMSS <10879 ~ l1934'>,,9PH,CD#l NQ1 Vers#5,,NQi,CD#i PMSS <10161 - 16118'~,,29,CD#1 PMS$ <0-12741'~,,NQ1PH,CD#1 CDi-14 Version#2,,14,CD#l CDi-14 PB1 Version#2,,14,CD#1 PMSS <0-???'>,,14PHi,CD#1 CD1-07 Vers#5,,7,CD#l CDi-18 Vers#3,,18,CD#l PGMS? <0-7639'>,,A1D3,A1Dine #3 29-Feb-2000 27-Jun-1999 15-Nov-2000 16-Mar-2000 17-Oct-2000 25-Sep-2000 1-Oct-2000 14-Dec-2000 4-Jan-2000 8-Dec-2000 26-Aug-1999 13-Feb-2000 14-Feb-2000 4-Jan-2000 22-Sep-1999 5-Sep-2000 3-Jan-2001 17-Dec-2000 22-Dec-2000 5-Jan-2001 13-Nov-2000 13-Nov-2000 13-Nov-2000 4-Jan-2000 4-Jan-2000 22-Dec-1999 24-Jan-2001 23-Jan-2000 23-Jan-2000 27-Sep-2000 27-0ct-2000 24-Jul-2000 20-Feb-2001 20-Feb-2001 26-Feb-2001 12-Feb-2001 23-Feb-2001 20-Oct-2000 8-Feb-2001 8-Feb-2001 18-Oct-2000 18-Oct-2000 19-Jan-2001 20-Feb-2001 20-Feb-2001 12-Feb-2001 12-Feb-2001 2-Mar-2001 5-Mar-2001 5-Mar-2001 5-Mar-2001 )168.1( )168.1( )138.9( )89.0( )598.2( )119.3( ) 119.3 ( )138.5( )138.5( )64.2( 188.4( 198.2( 198.2( 209.0( 209.0( 219.4( )98.8( )95.4( ~95.4( 148.3( 39.0( 39.0( 39.0( 179.5( 179.5( ,179.5( 158.6( 126.4( 126.4( 46.7( 75.3( 169.0( 1722.0( 28.7( 28.0( )28.0( )28.0( )8.2( )108.5( )108.5( )85.4( )85.4( )108.6( )109.2( )109.2( )36.9( )36.9( )38.2( )108.4( 250.0 250.0 200.0 200.0 12020.0 100.0 100.0 312.5 312.5 725.0 262.5 200.0 200.0 262.5 262.5 200.0 262.5 387.5 387.5 312.5 275.0 275.0 275.0 100.0 100.0 100.0 250.0 387.5 387.5 487.5 12780.0 200.0 10240.0 300.0 300.0 300.0 30O.0 337.5 687.5 687.5 475.0 475.0 262.5 100.0 100.0 375.0 375.0 275.0 287.5 )0.0( 13480.0 )2731.6( 13682.6 7600.0 6740.0 200.0 200.0 12020.0 100.0 11820.0 13080 0 8400 0 725 0 10500 0 200 0 200 0 262.5 262.5 13680.0 262.5 387.5 387.5 312.5 13560.0 11040.0 7500.0 100.0 100.0 8000.0 8260.0 387.5 387.5 487.5 12780.0 9980.0 10400.0 11300.0 10200.0 2433.3 10900.0 337.5 687.5 687.5 475.0 475.0 262.5 100.0 100 0 375 0 375 0 275 0 287 5 13480 0 13682 6 Phillips Alaska, Inc. CD#I 18 slot #18 Alpine Field North Slope, Alaska 3-D M I N I'M U M D I S T A N C E C L E A R A N C E R E P O R T INCLUDING POSITION UNCERTAINTIES Baker Hughes INTEQ Your ref : CDI-18 Vers%3 Our ref : prop3519 License : Date printed : 5-Mar-2001 Date created : 10~Aug-1999 Last revised : 5-Mar-2001 RECEIVED MAR 0 9 ?_001 Alaska Oil & Gas Cons. Commission Anchorage Field is centred on nT0 20 37.100,'w150 51 37.53 Structure is centred on n70 20 37.100,w150 56 46.041 Slot location'is n70 20 33.724,w150 55 34.323 Slot Grid coordinates are N 5975784.950, E 385879.881 Slot local coordinates are 342.87 S 2454.94 E Projection tylue: alaska - zone 4, Spheroid: Clarke - 1866 Reference North is True North Report is limited to clearances less than 500 feet Proximities will incorporate ellipses - when survey tools are defined for both wells. Ellipse separation in reverse brackets, e.g. )10.2(, where available. DECREASING CLEARANCES of less' than 1000 feet are indicated by an asterisk, e.g. 487.4* .. , .Object wellpath PGMS? <0-7639'>,,A1D3,Alpine %3 CDI-15 Version %2,,15,CD%1 PMSS <0-10548'>,,19,CD%1 PMSS <2827 - 11956'>,,194,CD#1 PMSS <10803-13706'.>,,24,CD#1 PMSS <0-9357'>,,16PH1,CD#l PMSS (8393 - 12600'>,,16,CD#1. PMSS (7182 - 11170'>,,41,CD#1 ' PMSS <475'- 8166'>,,41PH1,CD#l PMSS <9081 - 12811'>,,44,CD#1 PMSS <297 - 9882'>,,44PH1,CD#l PMSS (476 - 11190'>,,34,CD#1 PMSS <0-10897'>,,3,CD%1 PMSS <0-8350'>,,26PH1,CD%l PMSS <7755-11134'>,,26,CD#1 PMSS (0-8844'>,,45PH1,CD#l PMSS (7950-11950'>,,45,CD%1 PMSS <0-11608'>,,42,CD#1 PMSS <0-12921'>,,43,CD#1 PMSS <832 - 12147'>,,25,CD#1 PMSS <384 - 14477'>,,23,CD#1 Closest approach with 3-D Minimum Distance method Last revised Distance M.D. Diverging from M.D. 5-Mar-2001 )0.0 5-Apr-2000 )25.1 6-Apr-2000 )9.2 30~Apr-2000 )9.2 7-Aug-2000 )58.9 4-Jan-2000 )19.0 25-Oct-1999 )19.0 3-Apr-2000 )228.4 26-Mar-2000 )228.4 23-May-2000 )259.6 23-May-2000 )259.6 Il-May-2000 )158.0 A-Jan-2000 )146.8 6-Mar-2000 )79.4 1-Nov-1999 )79.4 .4-Jan-2000 )268.9 16-Nov-1999 )268.9 23uDec-1999 )239.2 27-Oct-2000 )249.9 15-Mar-2000 )67.4 29-Aug-2000 )47.5 16800 512 200 200 287 200 20O 200 200 200 2OO 262 475 25O 25O 25O 25O 20O 100 3OO 35O 16800.0 512.5 17000.0 1191.7 18004.6 200.0 200.0 86O0.0 200 0 10160 0 13120 0 14400 0 475 0 250 0 250 0 250.'0 250.0 9240.0 12400.0 300.0 350.0 PGMS <0-10255'>,,WD2,CD#1 PMSS <0-7331'~,,1PH1,CD#1 PMSS <5946 - 10289'>,,1,CD#1 PMSS <563-13977'>,,4,CD#1 PMSS <0-11492'>,,27,CD#1 PMSS <565 - 9505'>,,30PHi,CD#1 PMSS <8965 - 12850'>,,30,CD#1 PMSS <10013' - 14353'>,,32,CD#1 PMS$ <0-11067'>,,32PHi,CD#1 PMSS <0-11693'>,,10,CD#1 PMSS <562 - 12134'>,,37,CD#1 PMSS <654 - 10956'>,,38PB1,CD#1 PM$S <9876 - 12240'>,,38,CD#1 PMSS <0-10224'>,,39PHi,CD#1 PMSS <9146 - 13289'>,,39,CD#1 PMSS <0-12055'>0,40,CD#1 PMSS <656 - 7210'>,,28PHi,CD#1 PM$S <6549 - 10468'>,,28,CD#1 PMSS <507 - 10854'>,,33,CD#1 PGMS <0 - 8050'>,,22,CD#1 PMSS <8091 - 8372'>,,22,CD#1 PMSS <8464 - l1500'>,,22A,CD#1 PMSS <472 - 1545'>,,36PHi,CD#1 PMSS <763 - 7440'>,,36PH2,CD#1 PMSS <6600 - 10654'>,,36,CD#1 PMSS <0-12773'>,,2,CD#1 PMSS <0-10504'>,,5PHI,CD#1 PMSS <9499 - 14515'>,,5,CD#1 PMSS <0-11300'>,,13,CD#1 PMSS <0-13450'>,,35,CD#1 2lA Version #i,,21,CD#1 PMSS <9794 - 11087'>,,21,CD#1 PMSS <385-8950'>,,21PH1,CD~l PMSS <8460 - l1782'>,,21PB1,CD#1 PMSS IFR <564-18590'>,,17,CD#1 PMSS w/IFR <0-16024'>,,6,CD#1 PMSS w/IFR <12632-13308'>,,6PH,CD#1 PMSS IFR <0 - 15350'>,,9,CD#1 PMSS <10879 - l1934'>,,gPH,CD#1 PMSS <10161 - 16118'>,,29,CD#1 PMSS <0-12741'>,,NQIPH,CD#l CDi-14 Version#2,,14,CD#l PMSS <0-???'>,,14PH1,CD#I CD1-07 Vers#5,,7,CD#1 PMSS <473 - 14364'>,,31,CD#1 CDi-18 PH Vers#3,,18PH,CD#1 28-Jun-1999 29-Feb-2000 27-Jun-1999 15-NOV-2000 16-Mar-2000 25-Sep-2000 1-Oc~-2000 14-Dec-2000 4-Jan-2000 8-Dec-2000 26-Aug-1999 13-Feb-2000 14-Feb-2000 4-Jan-2000 22-SeD-1999 5-SeD-2000 17-Dec-2000 22-Dec-2000 5-Jan-2001 13-Nov-2000 13-Nov-2000 13-Nov-2000 4-Jan-2000 4-Jan-2000 22-Dec-1999 24-Jan-2001 23-Jan-2000 23-Jan-2000 27-Sep-2000 24-Jul-2000 20-Feb-2001 26-Feb-2001 12-Feb-2001 23-Feb-2001 20-Oct-2000 8-Feb-2001 8-Feb-2001 18-0c~-2000 18-Oc~-2000 20-Feb-2001 20-Feb-2001 12-Feb-2001 2-Mar-2001 5-Mar-2001 27-0ct-2000 5-Mar-2001 999.5 168.1 168.1 ,138.9 ~89.0 119.3 119.3 138.5( 138.5( 64.2 188.4 ,198.2 198.2 209.0 209.0 219.4( 95.4( .95.4( 148.3( 139.0( 39.0( 39.0( 179.5 179.5 ,179.5 ~158.6 126.4 126.4 46.7 169.0( 1722.0 28.0 28.0 ~28.0 )8.2 )108.5 )108.5 )85.4 )85.4 )109.2 )109.2( )36.9( )38.2( )108.4( )75.4( )0.0( 1611.1 250.0 250.0 200.0 200.0 100.0 100.0 312.5 312.5 725.0 262.5 200.0 200.0 262.5 262.5 200.0 387.5 387.5 312.5 275.0 275.0 275.0 100.0 100.0 100.0 250.0 387.5 387.5 487.5 200.0 10240.0 300.0 300.0 300.0 337.5 687.5 687.5 475.0 475.0 100.0 100.0 375.0 275.0 287.5 12780.0 13700.0 17600.0 7600.0 6740.0 200.0 200.0 100.0 11820.0 13080.0 8400.0 725.0 10500.0 200,0 200.0 262.5 262.5 13551.9 387.5 387.5 312.5 13519.4 11040.0 7500.0 100.0 100.0 8000.0 8260.0 13359.8 13359.8 13584.3 9980.0 10400.0 10200.0 2433.3 10900.0 337.5 687.5 687.5 475.0 475.0 100.0 100.0 375.0 275.0 13400.6 12780.0 13700.0 Phillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 March 9, 2001 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska, 99501 RECEIVED Re: Application for Permit to Drill CD1-18 (& CD1-18 PH) Dear Sirs: Alaska Oil & Gas Cons. Commission Anchorage Phillips Alaska, Inc. hereby applies for a Permit to Drill an onshore Water Alternating Gas (WAG) injection well from the Alpine CD1 drilling pad. The intended spud date for this well is May 5, 2001. It is intended that Doyon Rig 19 be used to drill the well. The CD1-18 PH will be drilled thr'ough to the base of the Alpine Sand at an inclination of approximately 63°. This will allow evaluation of the reservoir interval. 'It will then be plugged back and sidetracked to enable a horizontal penetration of the Alpine reservoir. After setting 7" intermediate casing, the horizontal section will be drilled and the well completed as an open hole injector. 'At the end of the work program, tt~e well will be closed in awaiting the completion of well work that will allow it to begin injection. : Per AOGCC regulations 20 AAC 25.412 (b)', it is requested that permission be given to place the production packer at +/-13101' MD. This is +/- 300' MD from the top of the Alpine., This request is being made so that the hole inclination will be Iow enough to enable running slickline tools to the packer and X nipple depth.. A similar request 'was made Prior to drilling CD1-06, and CD1-14, due. to the geometry of the well. A cement bond log 'will be run prior to drilling the 6-1/8" hole section. Please find' attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: . , 1.. Form '10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. Fee of $100 paYable to the State of Alaska per 20 ACC 25.005 (c) (1). ' 3. A' proposed drilling program, including a request for approval of annular pumping operations. . '. 4. A drilling fluids program summary. 5. Proposed pilot hole schematic. 6. Proposed completion diagram. 7.. Proposed completion diagram with open hole isolation optiOns. 8,. Pressure information as required by 20 ACC 25.035 (d)(2). 9. CD1-18 and CD1-18PH Cementing Requirements. 10. Directional drilling / collision avoidance information as required, by 20 ACC 25.050 (b). Information pertinent to this application, that is presently on file at the AOGCC is: . Diagrams of the BOP equipment, diverter equipment and choke manifold'laY out as required by 20 ACC 25;035 (a) and (b). · 2. A description of the drilling fluids handling system. If you have any questions or require further information, please contact Vern Johnson at 265-6081 or Chip AIvord at 265-6120. Sincerely, Vern Johnson Drilling Engineer Attachments CC: CD1-18 Well File / Sharon AIIsup Drake Chip AIvord Mike Erwin Gracie Stefanescu Lanston Chin ATO 1530 ATO 868 ATO 810 Anadarko - Houston Kuukpik Corporation e-mail ' Tommy_Thompson @ anadarko.com RECEIVED MAR 0 9 2001 / Alaska Oil & Gas Cons. Commission Anchorage American Express' Cash Advance Draft 122 PAY TO THE Issued by Integr~ed Payment System, Inc. Englewood, Colorado Payable at Nonvest Bank of Grand Junction - Downtown, N.~. Grand Junction, ~lorado ~: ~O ~ ~OO, hOO~-' ~ S NOT,,~/ALID FOR AMOUNT OVER $ 1000 c';.,,Y, SH~ON ;~.. u~,-~ I ,,'O ~ ?SOOO S ~,'0 ~ ~ ~ WELL PERMIT CHECKLIST FIELD & POOL ADMINISTRATION 1. COMPANY ,/~//, ~/~/v"2~ ' WELL NAME.~--~/-/ INIT CI..~S~' /- APPR DATE ENGINEERING DATE PROGRAM: exp dev .~.,,,/reddl Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from ddlling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available, in ddlling unit ............ 8. If deviated, is wellbore plat included ............. . . 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can.be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... G[ serv ~//wellbore seg ann. disposal para req ~/ AREA ~? ~r-',) UNIT# .~0,.~ g~ ON/OFF SHORE N N N N N N. N N N N N N 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. GEOLOGY DATE, Conductor stdng provided ................... Surface casing protects all known USDWs ........... CMT vol adequate to circulate on conductor & surf csg ..... CMT vol adequate to tie-in long string to surf csg .... .... CMT will cover all known productive horizons ..... ' ..... Casing designs adequate for C, T, B & permafrost ....... Y Y Adequate tankage or reserve pit ................. N f~'t~,,~'~ ~ ~-'t % I r,,O ~'~..~,~:.t",,.~ ~:~" If a re-drill, has a 10-403 for abandonment been approved... Adequate wellbore separation proposed ....... ; ...... ~ N ~.\(3e,~:_ ctc~)t--~3ct~l",~.'-~ ~ ~...)o.~,.'~'~ ~"~:c.~ If diverter required, does it meet regulations .......... Drilling.fluid program schematic & equip list adequate..... BOPEs, do they meet regulation ................ (X-~N . _ , ,~ . ~ _.__ BOPE press rating appropriate; test to ~ ~-~, J ~C~.X~ig. (=~N ~1~%~ ~,-~--~(~ ~L.ql~c~ ~ ~ ,c~, ~...~ ~t,..'~'¥F~ . Choke manifold complies w/APl RP-53 (May 84~ ......... (~N - ~ . Work will occur without Operation shutdown ........ . . . ~ _N ,. ' ,.. _ Is presence of H2S gas probable .... ..... ........ Y Permit can be issued wlo hydrogen sulfide measures ...... Y' N Data presented on potential overpressure zones .... · · · Y ~" ~,2 -/~ . Seismic analysis of shallow gas zones... ....... :.. ~ N ,,//~_.~r/'7', ' Seabed condition survey (if off-shore), ............ Contact name/phone for weekly progress reports [explorat?,,~nly] Y N ~ . ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ....... Y N APPR DATE (B) will not contaminate freShwater; or cause ddlling waste... Y N to surface; ' (C) will not impair mechanical integrity of the well used for diSposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAc 25.252 or 20 AAC 25.412, Y N GEOLOGY: ENGINEERING:. UICIAnnular COMMISSION: . "::~~'-,:., . . .,:¥'4'..'f" .~11~ m , c:~nsoffice\wordian~diana\checklist (rev. 11/01fl00) Comments/Instructions: 0 Z 0 --I