Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout100-268
~ STATE OF ALASKA
ALASKA. AND GAS CONSERVATION COMMIS~~
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 a. Well Status: OilL GasD Plugged D Abandone~~ Suspended D WAGD 1 b. Well Class:
20AAC 25.105 ~ 20AAC 25.110 Development 0 Exploratory D
GINJD WINJD WDSPLD No. of Completions Other Service D Stratigraphic TestD
2. Operator Name: 5. Date Comp., Susp., or 12~iII Number: Ii
Union Oil Company of California Aband.: 9/5/04 17-1 JOf) - ,;)."c¿š'
3. Address: 6. Date Spudded: 13. API Number:
PO Box 196247, Anchorage, AK 99519 nla 50-133-20241-01
4a. Location of Well (Governmental Section): 7. Date TD Reached: 14. Well Name and Number:
Surface: 1959 FSL, 1987 FWL, Sec 8 TIN R9W nla SCU 33A-08
Top of Productive Horizon: nla 8. KB Elevation (ft): 15. Field/Pool(s):
17' Swanson River FieldlHemlock
Total Depth: 2946 FSL, 1664 FWL, Sec 8 T7N R9W 9. Plug Back Depth(MD+ TVD):
10,889/10,670
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD + TVD): 16. Property Designation:
Surface: X = 340,347 Y = 2,454,088 11,086/10,850 Swanson River Field
TPI: nla 11. Depth Where SSSV Set: 17. Land Use Permit:
Total Depth: X = 340,726, Y = 2,453,212 nla A-028996
18. Directional Survey: Yes l.::.,No U 19. Water Depth, if Offshore: 20. Thickness of Permafrost:
nla feet MSL nla
21. Logs Run: nla
22. CASING, LINER AND CEMENTING RECORD
WT. PER SETTING DEPTH MD SETTING DEPTH TVD I AMOUNT
CASING FT. GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED
18" Driven
10-3/4" 40.5 23' 58' 23' 58' 15" see schematic for detail /
7-5/8" 26.4# N-80. S-95 3,332' 3,332' 23' 3332' 9-7/8"
5-1/2" 20# N-80 9,631' 11,178' 9,631' 11,178'
I
I
23. Perforations open to Production (MD + TVD ofTop and Bottom 24. TUBING RECORD
Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
see schematic for detail 2-7/8" 10,764' 10,739'
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) T AMOUNT AND KIND OF/MATERIAL USED
see schematic for full detail
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, gas lift, etc.):
nla n/a
Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: IGaS-Oil Ratio:
Test Period ....
Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity - API (corr):
Press. 24-Hour Rate .....
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
nla
~_JlA (,fv
Form 10-407 Revised 12/2003 CONTINUED ON REVERSE dT'\ r)af)~
,~
. ..itA\<
,,- ,\A
c\V'\
~
NAME
GEOLOGIC MARKERS ~
MD
29.
ORMATION TESTS
28
TVD
Include and briefly sumr ! test results. List intervals tested, and attach
detailed supporting data é:o~ 11ecessary. If no tests were conducted, state
"None".
none
RE:C£/\/f::.
. OCT 1 ~ 2004
Alaska Oil & Gas
Anch(¡t,..,,~ V'-" "",!or;
'. , "JCI
30. List of Attachments:
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Steve Tyler 263-7649
Title: Drilling Manager
Signature: -z..:.. c-
Phone: 907-276-7600
Date:
10/18/2004
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is
changed.
Item 1 a: Classification of Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for
I njection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool
completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on
this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show
the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately
produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other
(explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
~
UNOCAL@>
~oldotna Creek Unit
Nell No. 33A-8
Actual Completion 09/04/04
CASING AND TUBING DETAIL
10 To Btm Hole Cmt Cmt To
23' 58' Driven
10.050 23' 3,332' 15" 2218 It Lead 8urf
+ 150sx G
33.7 BTC 6.765 23' 85'
26.4 N-80 BTC 6.969 85' 3,940'
33.7 BTC x 8rd 6.765 3940' 3,958' 323sx w/2.4% gel 5,926'
7-5/8" 29.7 8rd 6.875 3,958' 6,905' 9-Va" CBL
33.7 8-95 8rd 6.765 6,905' 7,332'
DV Collar 7,332' 7,334'
33.7 8-95 8rd 6.765 7,334' 9,631' Lead 320sx G w/2.4% gel 8,736'
+ 100sxofG CBL
20 N-80 4.778 9,631' 11,178' 74 bbls of class "G" 10,792'
CBL
PERFORATION HISTORY
Interval Accum
Zooe Top Btrn Ant (ft) spf Con . ,Ients
4æ 490' 4' 4' TLtJing po..nch, 47 ~s œrert purped
3,424' 3,430' 6 2.5 TLtJing pulCh, 50 ~s œrert purped
H-2 10,836' 10,856' 2fJ 4
H-2 10,001' 10,871' 1(J 8
H4 10,914' 10,930' 16 4 19J1åed
H-5 10,938' 10,946' B 4 19J1åed
H-5 10,002' 10,970 B 4 19J1åed
Size
18"
10-3/4"
16
17
H-2
SWS Posi Set Plug @ 10,889'
H-4
H-5
H-5
Wt
Grade
Conn
40.5
K-55
JEWELRY DETAIL
NO. Depth ID aD Item
17' Shaffer, 3-1/2", 5M, Single Tubing Hanger CIW Type 'H' BPVP
510' 7-5/8" Cavins Bridge Plug
3,459 7-5/8" Cavins Bridge Plug
3 5.540' 2.35 4.75 McMurry Macco. 2-7/8" SMO-1 GLM, BK-2 wi Dummy
4 6,729' 2.35 4.75 McMurry Macco, 2-7/8" SMO-1 GLM, BK-2 wi Dummy
5 7,757' 2.35 4.75 McMurry Macco, 2-7/8" SMO-1 GLM, BK-2 w/ Dummy
6 8,593' 2.35 4.75 McMurry Macco, 2-7/8" SMO-1 GLM, BK-2 w/ Dummy
7 9,180' 2.35 4.75 McMurry Macco, 2-7/8" SMO-1 GLM, BK-2 wi Dummy
8 9,727' 2.35 4.5 McMurry Macco, 2-7/8" SMOR-1 GLM S.C. BK-2 Empty
9 10,242' 2.35 4.5 McMurry Macco, 2-7/8" SMOR-1 GLM S.C. BK-2 Empty
10 10,725' 2.35 4.5 McMurry Macco, 2-7/8" SMOR-1 GLM S.C. BK-2 Empty
11 10,763' 2.38 4 Anchor Seal Assembly, E-22, 2.77'
The following were set on E"Llne 10/31/90.
12 10,739' 3 4.44 Packer, 2-7/8 x 7-5/8" Baker Mod. 'F-1'
13 10,741' Millou! Extension, 5.63' Long
14 10,747' 1 Jt. 2-7/8" 6.5#, N-80, EVE 8 rd
15 10,778' 2.3 Otis 'XN' Nipple, 2-7/8" EVE 8rd, 2.313 w/2.25" N.G. w/ Plug in
place.
16 10,779' 1 Pup Jt., 2-7/8", 6.5#, N-80. EVE 8rd
17 10,783' WLREG
PBTD = 10,889' TD = 11,086' MAX HOLE ANGLE = 27 deg. GPS Reading 60.42 degrees 82 N, 150.53 degrees 62W 137',
33A-8Final093004 REVISED: 8/20/98 - ded
>ll'IformatioPi >Well >Directional Surveys >Ful~ey ~
Select Well: SCU 33A-O8 -~~~
Report Name Well Date Created
Position Log SCU 33A-08 10/18/2004
Well Name CURRENT STATUS API KB Surf X Surf Y
(ft) (ft) (ft) r-Interpolatel
SCU 33A-08 OIL 501332024101 154 340,347 2,454,088
MD TVD SSTVD X Off Y Off X Y Inc Azimuth
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (deg) (deg)
0 0 154 0 0 340,347 2,454,088 0.0 0
100 99 55 0 0 340,347 2,454,088 0.3 270
200 199 -45 0 0 340,347 2,454,088 0.3 258
300 299 -145 -1 0 340,346 2,454,088 0.3 262
400 399 -245 -1 0 340,346 2,454,088 0.2 282
500 499 -345 -2 0 340,345 2,454,088 0.7 318
600 599 -445 -2 1 340,345 2,454,089 0.3 343
700 699 -545 -2 1 340,345 2,454,089 0.4 41
800 799 -645 -1 2 340,346 2,454,090 0.7 37
900 899 -745 -1 3 340,346 2,454,091 0.6 17
1,000 999 -845 0 4 340,347 2,454,092 0.8 27
1,100 1,099 -945 0 5 340,347 2,454,093 0.9 356
1,200 1,199 -1,045 0 7 340,347 2,454,095 0.7 16
1,300 1,299 -1,145 0 8 340,347 2,454,096 0.9 3
1,400 1,399 -1,245 0 10 340,347 2,454,098 0.7 355
1,500 1,499 -1,345 0 11 340,347 2,454,099 0.8 12
1,600 1,599 -1,445 0 12 340,347 2,454,100 0.6 334
1,700 1,699 -1,545 0 13 340,347 2,454,101 0.4 319
1,800 1,799 -1,645 -1 13 340,346 2,454,101 0.6 274
1,900 1,899 -1,745 -2 14 340,345 2,454,102 0.6 293
2,000 1,999 -1,845 -3 14 340,344 2,454,102 0.3 286
2,100 2,099 -1,945 -3 14 340,344 2,454,102 0.3 274
2,200 2,199 -2,045 -4 14 340,343 2,454,102 0.3 286
2,300 2,299 -2,145 -4 14 340,343 2,454,102 0.4 304
2,400 2,399 -2,245 -5 15 340,342 2,454,103 0.3 313
2,500 2,499 -2,345 -5 15 340,342 2,454,103 0.4 302
2,600 2,599 -2,445 -6 15 340,341 2,454,103 0.3 295
2,700 2,699 -2,545 -6 16 340,341 2,454,104 0.5 272
2,800 2,799 -2,645 -7 16 340,340 2,454,104 0.6 291
2,900 2,899 -2,745 -8 16 340,339 2,454,104 0.3 301
3,000 2,999 -2,845 -8 16 340,339 2,454,104 0.1 233
3,100 3,099 -2,945 -9 16 340,338 2,454,104 0.1 253
3,200 3,199 -3,045 -9 16 340,338 2,454,104 0.1 286
3,300 3,299 -3,145 -9 16 340,338 2,454,104 0.1 330
3,400 3,399 -3,245 -9 16 340,338 2,454,104 0.1 295
3,500 3,499 -3,345 -9 16 340,338 2,454,104 0.1 125
3,600 3,599 -3,445 -9 16 340,338 2,454,104 0.3 65
3,700 3,699 -3,545 -8 17 340,339 2,454,105 0.4 45
3,800 3,799 -3,645 -8 17 340,339 2,454,105 0.4 61
3,900 3,899 -3,745 -7 17 340,340 2,454,105 0.6 38
4,000 3,999 -3,845 -7 18 340,340 2,454,106 0.3 14
4,100 4,099 -3,945 -6 19 340,341 2,454,107 0.8 13
4,200 4,199 -4,045 -6 21 340,341 2,454,109 1.0 348
4,300 4,299 -4,145 -7 22 340,340 2,454,110 1.0 339
4,400 4,399 -4,245 -7 24 340,340 2,454,112 1.0 358
4,500 4,499 -4,345 -7 26 ~40 2,454,114 1.3 360 ~
4,600 4,599 -4,445 -7 28 :hv,340 2,454,116 1.2 352
4,700 4,699 -4,545 -7 30 340,340 2,454,118 0.9 3
4,800 4,799 -4,645 -7 32 340,340 2,454,120 1.1 3
4,900 4,899 -4,745 -7 34 340,340 2,454,122 1.1 2
5,000 4,999 -4,845 -7 36 340,340 2,454,124 1.1 356
5,100 5,099 -4,945 -7 38 340,340 2,454,126 1.1 359
5,200 5,199 -5,045 -7 40 340,340 2,454,128 1.4 5
5,300 5,299 -5,145 -7 42 340,340 2,454,130 1.7 9
5,400 5,399 -5,245 -6 45 340,341 2,454,133 1.8 10
5,500 5,499 -5,345 -6 49 340,341 2,454,137 1.9 10
5,600 5,599 -5,445 -5 52 340,342 2,454,140 2.0 13
5,700 5,699 -5,545 -4 56 340,343 2,454,144 2.2 12
5,800 5,799 -5,645 -3 60 340,344 2,454,148 2.5 19
5,900 5,899 -5,745 -1 64 340,346 2,454,152 2.9 20
6,000 5,999 -5,845 0 69 340,347 2,454,157 3.4 17
6,100 6,098 -5,944 1 75 340,348 2,454,163 3.3 22
6,200 6,198 -6,044 4 80 340,351 2,454,168 2.9 22
6,300 6,298 -6,144 6 84 340,353 2,454,172 2.7 25
6,400 6,398 -6,244 8 89 340,355 2,454,177 2.8 23
6,500 6,498 -6,344 10 93 340,357 2,454,181 2.9 25
6,600 6,598 -6,444 12 98 340,359 2,454,186 3.1 25
6,700 6,698 -6,544 14 103 340,361 2,454,191 3.0 20
6,800 6,797 -6,643 16 108 340,363 2,454,196 3.1 22
6,900 6,897 -6,743 18 113 340,365 2,454,201 3.3 22
7,000 6,997 -6,843 20 118 340,367 2,454,206 3.2 23
7,100 7,097 -6,943 22 123 340,369 2,454,211 3.2 19
7,200 7,197 -7,043 24 128 340,371 2,454,216 3.2 22
7,300 7,297 -7,143 27 133 340,374 2,454,221 3.3 22
7,400 7,397 -7,243 29 139 340,376 2,454,227 3.3 20
7,500 7,496 -7,342 31 144 340,378 2,454,232 4.0 26
7,600 7,596 -7,442 36 151 340,383 2,454,239 5.6 39
7,700 7,695 -7,541 45 156 340,392 2,454,244 6.8 85
7,750 7,745 -7,591 51 156 340,398 2,454,244 7.6 93
7,800 7,795 -7,641 58 155 340,405 2,454,243 7.8 105
7,900 7,894 -7,740 70 148 340,417 2,454,236 8.0 137
7,950 7,943 -7,789 73 143 340,420 2,454,231 7.0 148
8,000 7,993 -7,839 76 137 340,423 2,454,225 6.4 160
8,100 8,092 -7,938 80 128 340,427 2,454,216 5.7 155
8,200 8,192 -8,038 86 119 340,433 2,454,207 7.2 132
8,300 8,291 -8,137 98 111 340,445 2,454,199 9.1 114
8,400 8,389 -8,235 113 102 340,460 2,454,190 10.4 122
8,450 8,438 -8,284 120 96 340,467 2,454,184 10.7 139
8,500 8,487 -8,333 125 88 340,472 2,454,176 11.0 156
8,550 8,536 -8,382 128 79 340,475 2,454,167 12.9 166
8,600 8,585 -8,431 130 67 340,477 2,454,155 14.6 169
8,650 8,633 -8,479 133 54 340,480 2,454,142 16.0 169
8,700 8,681 -8,527 135 40 340,482 2,454,128 16.8 171
8,800 8,776 -8,622 137 10 340,484 2,454,098 18.6 178
8,900 8,871 -8,717 136 -22 340,483 2,454,066 20.1 184
9,000 8,964 -8,810 132 -58 340,479 2,454,030 22.2 187
9,100 9,056 -8,902 125 -97 340,472 2,453,991 24.5 192
9,200 9,147 -8,993 119 -138 340,466 2,453,950 24.8 183
9,300 9,237 -9,083 120 -181 340,467 2,453,907 25.6 175
9,400 9,327 -9,173 123 -224 340,470 2,453,864 25.6 175
9,500 9,418 -9,264 125 -267 340,472 2,453,821 25.5 177
9,600 9,508 -9,354 127 -309 ~74 2,453,779 24.7 176 ~
9,700 9,599 -9,445 129 -351 3"Tv,476 2,453,737 24.8 177
9,800 9,690 -9,536 130 -392 340,477 2,453,696 24.3 179
9,900 9,781 -9,627 130 -435 340,477 2,453,653 25.7 180
9,977 9,850 -9,696 131 -469 340,478 2,453,619 26.8 173
10,056 9,920 -9,766 140 -503 340,487 2,453,585 27.1 159
10,087 9,948 -9,794 145 -516 340,492 2,453,572 27.3 154
10,125 9,981 -9,827 153 -532 340,500 2,453,556 27.3 152
10,251 10,094 -9,940 180 -582 340,527 2,453,506 26.2 149
10,345 10,178 -10,024 201 -617 340,548 2,453,471 26.1 149
10,409 10,236 -10,082 216 -642 340,563 2,453,446 26.1 149
10,535 10,349 -10,195 243 -689 340,590 2,453,399 25.5 148
10,630 10,435 -10,281 265 -723 340,612 2,453,365 25.0 147
10,713 10,510 -10,356 284 -753 340,631 2,453,335 25.0 145
11,007 10,777 -10,623 359 -852 340,706 2,453,236 25.0 139
11,120 10,881 -10,727 388 -886 340,735 2,453,202 22.0 139
11,178 10,934 -10,780 402 -903 340,749 2,453,185 21.5 139
11,228 10,981 -10,827 414 -917 340,761 2,453,171 21.5 139
r---.
~
8/18/104
Rest crew. SIMOP's with production and construction. PTSM with Peak crew.
Back fill hole on pad and grade pad around cellar. Lay felt and pit liner. Pull
grating from well head. Put Tyler work platform together. Checked well head tree
valves out. . Schlumberger crew Scheduled for this morning to perform MIT on 7
5/8" casing and leak off or injection rates on 10 3/4" shoe.
8/19/104
Crew rest. SIMOP's. PTSM with peak crew. Albin Hale out looking over projects.
Got word from agencies on waiving witness on MIT and injection test on surface
csg shoe. Safety meeting and rig up iron on 10 3/4" X 7 5/8" annulus (surface
casing) to Schlumberger pump. Went over pump procedure with Schlumberger
and Peak Vac truck operator. PJSM. Hydro Test lines to 3000# all OK. Put new
gauges on surface csg and tubing. Lubricate 31 Bbls of 8.36# drill water into 10
3/4" surface casing. Shut down at 150# and bleed gas. Pump 4 Bbls more at 0.5
BPM rate and reach 1500# max target. Shut down. Call town about squeeze
pressures and get new max pressure allowance of 2000#. While conversing with
town the shoe broke down and pressure starting dropping. Pumped 5 Bbls at 0.5
BPM rate at average of 1100#. Pumped 5 Bbls at 1.0 BPM rate at average of
1090#. Pumped 5 Bbls at 1.5 BPM rate with a average pressure of 1100#.
Pumped 5 Bbls of 8.36# drill water at 2.0 BPM rate with average squeeze
pressure of 1110# on 10 3/4" casing shoe. Shut down pump with Initial Shut In
Pressure of 1035#. Pressure dropped to 950# in first five minutes. Bleed down
surface piping and rigged up on 7 5/8" X 27/8" tubing annulus (production
casing) Put gauge in surface casing to monitor. Pressure test surface lines to
3000# all OK. Pump 1.7 Bbls into production casing and get 1700# on tubing and
production casing. Shut down and bleed tubing and production casing of gas. All
water returns. Pump 1.1 Bbls and get 2014# on 2 7/8" Tbg bad 7 5/8" production
casing. Shut down pump and valve off for 1/2 hour MIT. . During 1/2 hour test
pressure dropped from 2010# to 1959# (2.5 percent pressure drop over 1/2
hour). Bleed down and rig down Schlumberger. Shut down for night.
8/22/104
Move equipment from SRU 34-28 and spot on location. Hold tailgate safety
meeting and discuss job. Rig up on well. RIH with 2.3" gauge ring and set down
in master valve. Unable to get down. POOH. Make wire brush and run in hole to
tubing hanger. Unable to get deeper. POOH. Review files and talk with Steve
Tyler to see if anything was put in well head. Make up wire hook and hand line
fish around hanger and pulled a 3" metal ring from top of hanger. Fish around a
again pull another metal ring from on top of hanger. Pull third piece doing same
which ended up being a oil seal rubber with backup spring. After looking at all
three pieces it was identified as a 3" mechanical oil seal? (See pictures sent with
report. Pick up 2.3" Gauge Ring and RIH to 5471' RKB and set down. No
SCU 33A-08 Plug and Abandon Summary, last revised 10/18/2004
~
~
abnormalities other than the fish in tree. POOH. Rig down do paper work and
send Pollard home.
8/25//04
Sim-Ops mtg. with Plant personnel. Preliminary work for 33A-08. Lined up EL to
perform cut. Moved in Alaska Pipe Recovery spotted EL equipment, rigged up on
well picked up 2.25" JRC Jet cutter went in hole to 4,032' No.2 GLM tied in with
mandrel picked up to 3,529' RKB made cut, indication tubing cut. Rigged down
and secured well.
8/27//04
No Activity. Sim-Ops meeting with Plant personnel. Moved in offloaded BOPE,
Koomey Sytem and Handling tools. Tubing pressure zero, casing zero. Vetco
Grey installed two way check valve. Removed wellhead. Installed 9" 5-M X 11" 5-
M single studded spool adaptor, nippled up 11' 5-M BOPE Stack. Picked up Tyler
sub-structure, spotted over well, layed liner for 500-bbls. Frac tank spotted choke
manifold and frac tank. Made up hard lines from BOP's to Choke manifold. Set
beaver slide, and cat walk. Picked up and placed grading and hand rails for
structure. Pressure Tested BOPE to Unocal specification, 250-psi Low, 3,500-psi
high. Picked up 2-718" lift joint screwed into tubing hanger, backed out tie-down
pins. Picked up to 19,500-K hanger cleared bowl inspected seals on hanger OK
landed same. Closed pipe rams manually, installed TIW and secured well for the
night.
8/28/104
No Activity. Opened well a-psi on tubing and casing. Opened pipe rams overide.
Picked up Weatherford tubing tongs, spotted power pack. Chained Tyler
structure down to Stack. Latched tubing picked up with 20-K Ibs. broke out
hanger Pulled 71-joints of 2-718" 6.5# BTS tubing and laid down same. Crane
shutdown wouldn't start, pulled starter worked on same started back up. Finished
laying down 2-7/8" 6.5# BTS Tubing (110-joints 2-7/8", 1-cut piece, 3-pup joints,
1-GLM, & 3-1/2" 8RD X 2-7/8" BTS Hanger). Laid down handling tools, rigged up
Pollard S/L Picked up 6.73" Gauge ring, junk basket ran in hole to 3,533' SLM,
(3,540 RKB).POOH. Picked up 7-5/8" Cavin Bridge plug wlrunning tool, ran in
hole to 3,452' SLM (3,459' RKB) picked up set plug, pulled out of hole all
indication plug set successful. Secured well for the night.
8/29/104
No Activity. Sim-Ops meeting with Plant personnel. Informed BLM and left
message for AOGCC we was pumping cement. Moved in rigged up APRS picked
up 2.125" Ceramic Pod 180-degree phase w/16 shots perforating gun. Ran in
hole place shots across 3,424' to 3,430' RKB. Moved in rigged up Schlumberger
SCU 33A-08 Plug and Abandon Summary, last revised 10/18/2004
~
.~
cementers to 2-7/8" Landing joint, pressured tested lines to SOO-psi. Pressure up
on 7 -S/8" casing to SOO-psi fired guns pressure dropped immediately to 1 SO-psi
Pulled up to 90' RKB bled off pressure no flow. RID APRS. Broke circulation
down 7-S/8" casing taking returns up 10-3/4" surface casing as followed: (1-bpm,
wI 220-psi, 2-bpm, w/311-psi, 3-bpm, w/38S-psi, 4-bpm w/460-psi, S-bæ:O-
psi shutdown after pumping 26-bbls. Getting returns. Mixed & pumpe 0- s.
Of 1S.6-PPG G-Neat cement displaced with 160-bbls. Fresh water hi
pressure 1,340-psi, ISIP 960-psi closed TIW valve. Secured well for the Night.
Called BLM for witness of TOC 8/301104.
----
8/30/104
No Activity. Sim-Ops Meeting with Plant personnel. Held JSA Moved in Slickline
picked up 6.73" gauge ring went in hole and tagged @ 3,191' SLM (3,198' RKB).
POOH Witnessed by AOGCC. Picked up 7-S/8" Cavin bridge plug, stood back,
rigged up test line to 10-3/4" surface casing pressure up to 480-psi, rigged up to
7-S/8" production casing pressure up to 1 ,SOO-psi after 30-minutes Surface Csg.
460-psi, Casing 1,480-psi. Good test witnessed by AOGCC. Rigged up to 10-3/4"
pressured up to 1 ,SOO-psi 7 -S/8" 230-psi 10-3/4" appeared to be leaking tested
several times same results, eventually found pressure leaking back through
pump changed out valve and re-pressured with no problems. 7-S/8" 23S-psi, 10-
3/4" 1,4S0-psi 30-minute test Good test. Finished rigging up SL ran in hole to
S03' SLM (S10' RKB) set bridge plug had 2S0-lbs. extra pull, pulled free POOH.
Rigged up EL picked up 2.12S" ceramic perforating gun with 16-shots (3/8" ~
holes). Ran in hole and perforated @ 486'-490' RKB. POOH. Rigged up
Schlumberger cementer Held JSA broke circulation down 7 -S/8" with 2-bpm rate
10-psi. Shutdown afte~2- . Pumped. Mixed and pumped 1S.8-PPG cement
got back 1S.S-PPG afte 4'Z bbls. Pumped. Rigged down Schlumberger, Slickline
and EL. Cleaned up c with Supervac. Lined up trucks to start de-mobe.
Loaded out Weatherford casing tongs for Rig.
--
8/31/104
No Activity. Sim-Ops meeting with Plant Personnel. Nippled down BOPE stack,
(Hydrill, Pipe Rams, Blinds and Valves) loaded on WBI truck sent to
Weatherford. Broke down and loaded out Swaco Koomey system sent to
Anchorage. Loaded out tubulars (3-1/2" EUE 8-Rd x 2-718" 6.4# Buttress Hanger,
110-joints 2-7/8 6.4# Tubing, 3-2-7/8" Pup joints, 1-GLM, and cut piece onto WBI
trailor. Ensure all protectors on joints ends. Gauge TOC in 7 -S/8" Casing (2S'
from casing flange) gathered all Unocal cement equipment ordered out cement
none to be found. Lined up BLM, AOGCC, and Unocal Remediation Department
to witness this AM. Moved frac tank, cleaned up location around well cellar,
preparing to top 7-S/8" casing with cement.Finished loaded trailor with wellhead
and casing spool.
9/1/104
SCU 33A-08 Plug and Abandon Summary, last revised 10118/2004
~
/"'"' ,
No Activity. Sim-Ops meeting with Plant personnel. BLM Representative on site,
¿e. up 30' 1.5" PVC tripped in hole 25' tagged cement. Mixed and pumped -
1.2 bls. 15.5-PPG G Neat cement got cement returns up 7-5/8" shutdown to let
ment heal. De-mobe cement equipment to SRU-41-33.
9/2/104
No Activity. Moved from SRU 41-33 WD. Layed liners down made two
containments to hold dirt from around cellar. Steamed clean cellar culvert, dug
up soil around culvert and removed culvert with track-hoe. Broke up cellar
cement bottom with track-hoe and place in containment. Started slopping banks,
preparing hole for personnel to safely cut cason.
9/3/104
No Activity. Sim-Ops meeting with Plant Personnel. Finished preparing well for
abandonment. Separated debris from dirt from both containments, put debris in
dumpster. Order out second dumpster No.1 heavy with concrete. Layed liner
over No.1 & No 2 containments. Attempted to pull piling with Crane and
Trackhoe pulled 38,OOO-lbs. didn't move, will need to cut off 3' below oringinal
ground level. Plans are to cut the 4-piling after well is cut and capped.
9/4/104
No Activity. Moved in rigged up Casing cutter, Notified AOGCC & BLM. Made cut
18" conductor, 10-314",7-5/8" made cut, took pictures sent to Town. Welded /
plate on top. Moved to SRU 41-33 WD.
9/5/104
No Activity. Dug out around columns made cuts on all four. Well cap 6.6'. Dug
dirt out inside columns 1/2' put cement inside on all four columns. Started back
filling hole with dirt from No.1 & 2 containments. See below details. Well was cut
6-1/2' Below Ground Level, Columns 8.1',8.4',8.0',7.8' below ground level. GPS
Reading 60.42 degrees 82 N, 150.53 degrees 62W 137'.
SCU 33A-08 Plug and Abandon Summary, last revised 10/18/2004
2004-0830 _P&A- seD _33A-08 _lg.doc
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg,. 'Ke,ra q( ¡,JI¡ DATE: August 31,2004
P. I. Supervisor ( l '1V
THRU:
FROM: Lou Grimaldi,
Petroleum Inspector
SUBJECT:
Plug and Abandonment
SCU 33A-08
PTD #100-268 (304-109)
Soldotna Creek Unit
Swanson River Field
Mondav. Auaust 30. 2004; I witnessed P & A procedures on Unocal's well SCU
33A-08 in the Swanson River Field.
I arrived to witness the cement plug tag inside the 7" casing by Wireline at 3198'
(RKB ).
The plug's in the 7"and 7" x 10 % annulus were pressured tested separately to
1500 psi checking for plug and string integrity. Both plugs passed their pressure
test.
A 7" Cavins cement retainer was set at 510'. The 7" casing was perforated at 486'
thru 490" with 4/spf.
45 Barrel's of "neat" G cement was pumped down the 7" with returns taken from the
10 %, a 15.5 ppg cement sample was observed taken from the 10 %.
I left location at this time.
S<;ANNED OCT 0 9 2004
2004-0830 _P&A - SCU _33A-08 Jg.doc
lof3
2004-0830 _P&A _seD - 33A-08 _lg.doc
Saturday. September 4. 2004: I returned today to check the cutoff and marker for
this well. The cut-off work had progressed more quickly than anticipated and I
approved welding the cap on before I arrived. Dan Macdonald (Unocal) had taken
some good pictures of the cut-off stub.
I arrived to find the cap welded on and the stub to be approximately 6" below final
grade. There were still 4 steel pilings driven in around the well, I advised Dan that
these be cut off and capped if they could not be pulled easily.
Attachments: SCU 33-08 marker plate.JPG
SCU 33-08 pilings.JPG
SCU 33-08 Cemented pilings.jpg
NON-CONFIDENTIAL
Cc; Tim Lawlor (BLM)
SCANNED OCT 0 9 2004
2004-0830 _P &A - SCU - 33A-08 _lg.doc
2of3
2004-0830 _P&A - seu _33A-08 _lg.doc
Soldotna Creek Unit 33A-08 (Unocal) Suñace Abandonment Inspection
Photos from AOGCC Inspector Lou Grimaldi
August 30-31 , 2004
seu 33A-08 Marker
Plate Installed
seu 33A-08 Pilings
seu 33A-08 Piling
eemented
SCANNED OCT 0 9 2004
2004-0830 _P &A - SCU _33A-08 Jg.doc
30f3
jcPI. /119
UNOCALi>
-Alaska
Philip J. Krueger
Drilling Manger
Unocal Alaska
Tel 907.263.7628
Fax 907.263.7884
Cell 907.250.2712
E-mail PKrueger@unocal.com
August 23, 2004
Winton Aubert
AOGCC
333 West th Avenue, Suite 100
Anchorage, Alaska 99501
Re:
Swanson River SCU 33A-08
P&A BOPE Configuration
RECEIVED
AUG 2.( 2004
Alaska Oil & Gas Cons. Commission
Anchorage
Dear Mr. Aubert:
We are requesting a variance of 20 MC 25.285 (c) (9) and (10).
(9) (c) J(/(})(lJ)
We are preparing to perform a surface casing shoe abandonment on SCU 33A-08, utilizing a crane
and work platform. We have reviewed the conventional BOPE rig up and equipment and have
augmented it for this well to satisfy our internal standards. The proposed well control system will
exceed the safety standards for the expected pressure and flow regimes in the wellbore.
The Hemlock production interval was previously abandoned on 8/16/01. This provides the benefit of
working in a closed wellbore. The well has no open perforations and is not capable of flowing any
fluids. The well control system, as proposed, will facilitate the pulling of 3500' of tubing from the
wellbore and allows the conclusion of the abandonment process for this well.
We consider the application of this, and all BOP configurations, to be specific for each individual
well. We do not intend or desire to consider this as an area wide or unilaterally applied configuration.
We are greatly appreciative of your review of this proposal and look forward to meeting with you to
discuss any issues. Attached you will find a brief description of the BOP configuration and a layout
schematic.
Please contact Steve Tyler at 263-7649 or tvlersl@unocal.com for any questions you may have.
,
-
Best regards,
~/~,-
Philip J. Krueger
Drilling Manager
cc: Steve Tyler
4rr I
~'
Attachments
~
Union Oil Company of California I Unocal Alaska 909 West 9th Avenue. Anchorage. Alaska 99501
http://www.unocal.com
BOP Configuration
Reservoir
The highest anticipated BHP, at this time, is 1530 psi @ 3,500 TVD which is equivalent to a
.4368 psi/ft gradient or a 8.4 ppg EMW. Fully evacuated, the MASP would be as follows:
1530 psi BHP - (3500' TVD x .1 psi/ft Gas Gradient) = 1,180 psi MASP. /'
Proposed Confiauration
BOP's
Annular,5K 11" Hydril Studded Top and Flanged Bottom.
Double gate, 5K, 11" Shaffer LWS DBL
Mud Cross, 11" Drilling Spool
Accumulator
Swaco Koomey, 3000 psi, 140 gallon, 14 ea. 11 gallon, 210 gallon fluid reservoir, 4 ea.
nitrogen back up bottles, air operated pump.
Pump
The pump is an 10,000 psi Schlumberger cementer pump truck.
Kill Line
The Kill Line/Circulating Line will consist of 2",10,000 psi Iron with integral Fig 1502 Unions. /'
Kill Line Valves ~
The kill line valves will consist of, at a minimum, 2 ea. .. nuall operated, 2-1/16", 5K valves
attached to the mud cross. .
Choke Line Valves
The choke line valves will consist of, at a minimum, 2 ea. manually operated, 2-1/16". 5k
valves that will be attached to the mud cross.
Choke Line
The choke line will consist of either 2", 10,000 psi Iron or 2" 5,000 psi hose with integral Fig
1502 Unions.
Choke Manifold
The choke manifold is 2-1/16", 5K with two manual chokes and five valves. There are two
valves upstream of each choke.
Choke Return Line/Gas Buster Line
The gas buster line will consist of 2",5000 psi hose with threaded Fig 1502 Unions. The line
will run from the choke manifold to the gas buster.
Gas Buster
The gas buster is located in the 300 bbl flow-back tank.
Soldotna Creek Unit
Well No. 33A-8
Actual Completion 8/18/98
UNOCAL~
1 Temporary Abandoned on 8/16/011
3
CASING AND TUBING DETAIL
Size Wt Grade Conn ID To Btm Hole Cmt Cmt To
18" 17' 58' Driven
10-3/4" 40.5 K-55 10.050 17' 3,332' 15" 2218 It Lead Surf
+ 150sx G
33.7 BTC 6.765 17' 85'
26.4 N-80 BTC 6.969 85' 3,940'
33.7 BTC x 8rd 6.765 3940' 3,958' 323sx w/2.4% gel 5,926'
7-5/8" 29.7 8rd 6.875 3,958' 6,905' 9-Yo" CBl
33.7 S-95 8rd 6.765 6,905' 7.332'
DV Collar 7,332' 7,334'
33.7 S-95 8rd 6.765 7,334' 9,631' Lead 320sx G w/2.4% gel 8,736'
+ 100sxofG CBl
20 N-80 4.778 9,631' 11,178' 74 bbls of class 'G" 10.792'
CBl
2
JEWELRY DETAIL
NO. Depth ID OD Item
17' Shaffer, 3-1/2", 5M, Single Tubing Hanger CIW Type 'H'
Collapsed Tbg @ BPVP
7,651' I 2,239' 2.347 4.750 McMuny Macco, 2-7/8" SMO-I GLM, BK-2 wI Dummy
Tagged on 7/16/01
2 4,032' 2.347 4.750 McMuny Macco, 2-7/8" SMO-I GLM, BK-2 wI Dummy
3 5,540' 2.347 4.750 McMuny Macco, 2-7/8" SMO-I GLM, BK-2 wI Dummy
4 6,729' 2.347 4.750 McMuny Macco, 2-7/8" SMO-I GLM, BK-2 w/ Dummy
5 7,757' 2.347 4.750 McMuny Macco, 2-7/8" SMO-I GLM, BK-2 w/Dummy
6 8,593' 2.347 4.750 McMuny Macco, 2-7/8" SMO-I GLM, BK-2 wI Dummy
7 9,180' 2.347 4.750 McMuny Macco, 2-7/8" SMO-I GLM, BK-2 wI Dummy
8 9,727' 2.347 4.500 McMuny Macco, 2-7/8" SMOR-I GLM S.c. BK-2 Empty
9 10,242' 2.347 4.500 McMuny Macco, 2-7/8" SMOR-I GLM S.C. BK-2 Empty
10 10,725' 2.347 4.500 McMuny Macco, 2-7/8" SMOR-I GLM S.C. BK-2 Empty
11 10,763' 2.375 4.00 Anchor Seal Assembly, E-22, 2.77'
The following were set on E-Line 10/31/90.
12 10,739' 3.000 4.437 Packer, 2-7/8 x 7-5/8" Baker Mod. 'F-I'
13 10,741' Millout Extension, 5.63' Long
14 10,747' I Jt. 2-7/8" 6.5#, N-80, EVE 8 rd
15 10,778' 2.250 Otis 'XN' Nipple, 2-7/8" EVE 8rd, 2.313 wI 2.25" N.G. w/
Plug in place.
16 10,779' I Pup Jt., 2-7/8", 6.5#, N-80, EVE 8rd
17 10,783' WLREG
XN
16
H-2
PERFORA nON HISTORY
IntervaI Aœmn.
Date Zone Top Btm Am: spf Cormmts
7/1/93 H-2 10,836' 10,856' 2CY 4
7/1/93 H-2 10,861' 10,871' 10' 8
10/90 H4 10,914' 10,930' 16' 4 Isolated
10/90 H-5 10,938' 10,946' 8' 4 Isolated
10/90 H-5 10.962' 10.970' R' 4 T~ated
17
SWS Posi Set Plug@ 10,889'
8-4
H-5
H-5
PBTD = 10,889' TD = 11,086'
MAX HOLE ANGLE = 27 deg.
33A-8Current8-18-01.doc
DRAWN BY: tcb
REVISED: 8/20/98
UNOCAL SWANSON RIVER
SCU 33A-OS
STACK HEIGHT
S'g"
.
WeatB1on1'
~
Ç:
112718 Pipe II
::J C
II
II Blinds
OJ 11" 5M Hydril Annular
5M Studded Top and Flanged Bottom
47 3/4" Tall
~m11" 5M Shaffer lWS DBl
~ 33" Tall x 89 1/4" Wide x 54" Thick
~ 311"5MDrillingSpool
I 4" 5M OTl
wI 2 ea
24" Tall
/
3" 5M HCR 3" 5m MGV
rn œ rn
1 11" 5M Hydril Annular BOP
2 11" 5M Shaffer lWS Double BOP
3 11" 5M Drilling Spool w/2 ea 4" 5M OTl
4 3" 5M Hydraulic Gate Valve
5 3" 5M Manual Gate Valve
6 DSA 4" 5M x 3" 5M
7 DSA 4" 5M x 2" 5M
821/16 5M Manual Gate Valve CIW
921/16 5M Manual Gate Valve CIW
DII~DD[J] 0
2' 5M MGV 2" 5M MGV rr;ñanual
rn rn rn ~hoke
12" 10m Chiksan Iron. I
2" Sm High Pressure hose.
To Flow Back Tank
sell 33:\-08
I 0 0 - Uo f(
7~ 01 - / c q
Phase # 2 &3 P&A
1.
Workover Summary:
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Prep-Work- RU pump truck to 7-5/8" x 10-3/4" annulus. Establish injection
rates & pressures down/out 10-3/4" shoe.
Prep-Work- RU pump truck to 2-7/8" x 7-5/8" annulus. MIT to 2,000 psi f/
30 min.
Mobe 45 ton crane to Location. Spot Crane, Pipe Racks & accessory
equipment on liner. Berm in same. SpotlRU work platform
NU BOPE. Pressure test same
RU Eline. RIH cut tbg @ :t3,500'. POOH & LD same.
RU Slickline. RIH set Cavins BP @ :f:3450'. Dump bail 5' of cmt on
top of BP.
RD/Demobe crane, work platform and BOPE's. Jug test well to 1500
psi.
RU Eline, cementers, cement head and junk tank. RIH w/ Eline.
Perforate 3430':t & 3230':f: w/5' x 2.5" PowerJet HC guns. Establish
circulation/sqz rates & pressures down 7-5/8" and out 7-5/8" x 10-3/4"
annuli to junk tank. RD Eline.
Sqz/circulate/spot 50 bbls of G-neat cmt (250 sx) in 7-5/8" x 10-3/4"
annuli. Displace cmt w/ 7-5/8" wiper plug & 160 bbls of lease water.
Trap pressure on 7-5/8" csg. WOC for 12 hrs.
RU pump to 7-5/8" x 10-3/4" annulus. MIT 10-3/4" shoe.
RU slickline. Set Cavins BP @ 510':f:. Dump bail 5' of cmt.
RU Eline. Perf circulation holes @ 490':1:. Establish circulation down
7-5/8" and out 7-5/8" x 10-3/4" annuli to junk tank. RD Eline.
Circulate/fill 7-5/8" csg & 7-5/8" x 10-3/4" annuli with 50 bbls of G-neat
cmt to surface. RD cementers.
Excavate/remove cellar. Continue excavating around well a 12' x 8'
hole. RU csg cutters on 18" conductor pipe. Cut surface csg tubulars
off 3' below orginal ground level.
Weld surface abandonment plate onto conductor. Record GPS
reading of well. Backfill hole.
Lt, Ct l-l'Y ç 1\.'1) Ilr \.-' II {j 1l-0( E - Þ<ü"t- / / ~ I &/ 7£,'4
l;Jé? /\-cL.L.._.Lt;-
SClI 33A-(JS Phase#2&3 P&A Procedure Re\'O (l7-Ü~
Page 5 of 5
Revision # 0
8/3/200-1
Soldotlltl Creek 1I nit
'''ell No. 33.'\-8
Actual Conlpletion 8/18/98
UNOCALe
I Temporary Abandoned on 8/16/011
C\SIi\G :\~D lTBIi\G DET.\IL
Orig. RKB = IT Size Wt Grade Conn 10 Top 8tm Hole Cmt Cmt Top
~-..". 18" 17' 58' Driven
,,,,--
1-'" 2218 ¡I\ead
I"'.. 10-314 - 405 K-55 10050 17' 3.332' 15" Surf
..~I
J"."'-. - + 150sx G
-..'
,,,,-.
..~I 337 BTC 6765 17' 85'
,,,,-.
1-'" 26.4 BTC 6.969 85' 3940'
..,.. N-80
1-'"
,,,,-. 337 BTC x 8rd 6765 3940' 3,958' 5,926'
1-'" 323sx w/2 4"0 gel
I~.. (8 297 8rd 6875 3.958' 6.905' CBL
..~I 2 7 -5/8 - 9-~ÍI"
,,,,-.
1-'" 337 S-95 8rd 6765 6,905' ì,332'
11f-.
..... DV Collar 7,332' 7,334'
~ - 33.7 5-95 8rd 6.765 7,334' 9,631' Lead 320sx G w/2 4û~ gel 8.736'
+ 100sx of G CBL
5- 112" 20 N-80 4778 9.631' 11.178' 74 bbls of class "G" 1 0,792'
J TOC in Tbg ,~' CBL
S,548'
Tagged eon 8 I ~ ('I Tubing
2-7/8" I 64 I L-80 I BTC SC I 2441 I 17' I 10,764'~~
~(). .Benth II)
IT
Ce,llJp,ed Tbg ,~'
7.651 2.239'
T J!!ged on 7 I (i ,) I 2.347
2 ..L032 , 2.347
3 5,,540' 2.347
4 6.729' 2.347
5 7,751' 2.347
6 8593' 2.347
7 9.ISO' 2.347
8 9,7"21' 2.347
9 IO,,2-t2' 2.347
10 10" 7"25' 2.347
II 10,,763' 2.375
12 10,739' 3.000
13 10,741"
~ 14 10,7-11'
15 10,77S' 2.1511
16 10.779"
17 10,783"
12
13
14
15
,'\1';,
~- l
16 ~. ~
r ~
U
1'"
~ ...--
r"'-. ..~
= ,,/'.
- ...,
1':SII~.
- .-.,
r..J I~.
Co ...,
I- I~.
...,
',/'.
1-"
,,/'
1-"
,,/'.
I.:\,
~~~-><~
,,/'.
.-.,
,,/'.
.-.,
',/'.
.-.,
,,/'.
.-.,
'...
...,
,,/'.
rj.)
.-.,
'...
~
17
33A-8CulTem8-18-0 I-I.doc
.JEWEI.!:tY DETAIL
Irem
Shaffer. 3-112". 5~1. Single Tubing Hanger CIW Type "H'
BPVP
4.750 I\kMul1)'l\lacco. 2-7/S" S~10-1 GLI\1. BK-2 wI Dummy
.U50 I\lcl\lul1)' I\lacco. 2-7/S" SI\IO-I GUI, BK-2 wI Dumm~
4.750 1\1cl\1urry I\lacco. 2-7:8" S~10-1 GLI\1. BK-2 wI Dummy
4.750 I\lcl\lul1)' I\lacco. 2-7/8" S1\.10-1 GLI\I, BK-2 wI Dummy
4.750 I\lcl\lul1) I\lacco. 2-7/S" S~10-1 GLI\I, BK-2 wI Dummy
4.750 1\1cl\lurry I\lacco, 2-7/8" S~10-1 GLI\1. BK-2 wI Dummy
4.750 1\lcl\lul1)'l\lacco, 2-7/S" S1\10-1 GLI\1. BK-2 wI Dummy
4.500 1\lcl\.lul1)'l\.lacco, 2-7/S" SI\IOR-I GLI\I S.C BK-2 Empty
4.500 1\1cl\lulT) I\lacco. 2-7/8" S~10R-1 GUI S.C BK-2 Empt~'
4.500 1\.1cl\1urry I\lacco, '2-7/S" S1\10R-1 GUI S.c. BK-2 Empty
4.00 .\nchor Seal Assembly, E-22. 2.71'
on
4.437
The folloning were set on E-Line 10/31/90.
Packer, 2-7'8 x 7-5/8" Baker I\lod. "F-I'
1\ liIIollt Extension, 5.63" Long
I .II. '2-7/S" 6.5#. N-80. EUE S rd
Otis '~"N' Nipple. 2-7/S" EUE Srd, 2.3 IJ \\,' 2.25" N.G. wI
Plug in place.
I Pup Jt.. 2-7/S". 6.5#, N-80. EUE Srd
\\'LREG
- H-2
PERFORATION HISTORY
Interval Arcum
Date Zone Top Btm .-\rrf spf
7:'193 H-2 10,836' 10.856' 20' 4
7i1,93 H-2 10,861' 10,87 \' 10' 8
10.90 H~ 10.914' 10,930' 16' 4
1090 H-5 10.938' 10,9-16' 8' 4
10 90 H-5 I 0.9ó2' 10.970' R' 4
lsolata:l
lsolatal
l<nlatal
C.on...rnts
S\\'S PO;,I Sct Plu~ ':~, I') :s89
H-4
H-5
H-5
PBTD = 10,889' TD = 11,086'
l\IAX HOLE ANGLE = 27 deg.
-~
DRA\VN BY: tcb
REVISED: 8/20/98
UNOCAL8
t,.
--.........' "oi."oi."."."."."."oi.iii,."j(ÏI'"8'
:~~~~-t'-t~-t~-t~-t~-t~-t~-t~-t~~~-t- ~-t~
--''''_~'_'''_'_'''-'''-'''-'''-'''-'''-'''.''' ".-~".--
--.. .~-"oi."-"-"oi-'"8-"oi-"M"oi~.'"8'
.".-- "'~JI_'JI_'JI_'JI_'JI_'JI_'JI.5'.~-_"'-1I
~,;.~: ~_II. - .-11.- ~,;.~~ BP ~ 5 I O'
--.., .-...
:«~ ~ot~
~~-t~ ~~~
'..-- ,,,.--
.-"oi' .-"oi'
,,,.-- .".--
--"oi. --"oi.
.".-- ."...
:,;.~';;'':.';;'':.';;'':.';;'':.';;'~';;'!.';;'':.SE~'! ..~~
:-:.~-t!-t!-t!-t!Cement.~-J
- -- -- -- -":'.-""'--= -- BP (~, .1450'
Toe In Tbg ,~'
~.5.8'
T Jgged c'l' 8 I g ,) I
Proposed Abandonment #2
Soldotn3 Creek Un it
'''ell No. 33:\-8
Actual Conlpletion 8/18/98
C.\SII\G '\~D lTBll\G DETAIL
Size Wt Grade Conn 10 Top Btm Hole Cmt Cmt Top
18" - 20' 58' Driven
10-3/4" 405 K-55 10050 20' 3,332' 15" 2218 ft)Lead Surf
+ 150sx G
337 BTC 6765 20' 85'
264 N-80 BTC 6969 85' 3,940'
337 BTC x 8rd 6765 3940' 3.958' 323sx w/2.4~o gel 5,926'
7.5/8" 297 8rd 6875 3.958' 6.905' 9"~ÍI" CBL
337 S-95 8rd 6.765 6.905' 7.332'
DV Collar 7,332' 7.334'
337 S-95 8rd 6765 7,334' 9,631' l'Õ'ad 320sx G w/2 4Q~ gel 8,736'
+ 100sx of G CBL
5-112" 20 N-80 4778 9.631' 11,178' 74 bbls of class "G" 10,792'
CBL
Tubing
2-7/8" 1 6.4 I L-80 I BTC SC I 2.441 1 3500' 110.764' ~~~~
J£\\'ELI~\' DETAIL
C ollJpsed TI:-g ',~' NO. D('')( II ill OD 1(('111
., 6~ I' IT - - Sh3lTer. 3-1/2"". 51\1. Single Tubmg Hanger CI\\' Type 'H' BPVP
TJn:ed on" 1601 3 5 SHY 2.347 4.750 1\1c1\IUIT)' Macco. 2-7/S" S!\IO-I GL1\1. BK-2 wI Dummy
4 6.729' 2.347 ..USO 1\lcl\lulT)'1\lacco. 2-7/8" S1\10-1 GL1\1. BK-1 wI Dummy
5 7,751' 2.347 ,U50 !\1c!\lurry 1\lacco. 2-7/8" SI\IO-I GUI. BK-2 wI Dumm~'
6 8.593' 2.J47 4.750 1\1c1\lurry !\Iacco, 2-7/8" S!\IO-I GL1\1. BK-2 wI Dummy
7 9.180' 2.347 4.750 1\lc!\luIT)' !\Iacco. 2-7/8" SI\IO-I GL1\1. BK-2 wI Dummy
S 9.721' 2.347 ..1.500 !\1c!\lulT)' Macco. 2-7/S" SI\IOR-I GUI S.c. BK-2 Empty
9 10,242' 2.347 4.500 !\lcMurry 1\13CCO. 2-7/S" S1\10R-1 GLl\r S.c. BK-2 Empty
10 10.725' 2347 4.500 !\1c!\lulT)' Macco. 2-7/8"' S!\IOR-I GUI S.c. BK-2 Empt~'
II 10.763' 2.375 4.00 Anchor Seal Assembly. E-22. 2.71'
The following were ~et on E-Line J0/3J/90.
12 10.739' 3.000 4,437 Packer. 2-7:8 x 7-5/8" Baker 1\lod. 'F-I'
\.3 10.741' - - !\Iillout Extension, 5.63" Long
14 10.741' - - I .It. 2-7/S"' 6.5#, N-SO. EUE 8 I'd
~ 15 10.778' 2.:~ 50 - Otis '\.'N' Nipple, 2-7/8" EUE Srd. 2.313 wi 2.25"' N.G. wI Plug
in pl3ce.
16 10.779' - - I Pup.ll.. 2-7/8", 6.5#. N-80. EUE Srd
17 10.783" - - \\'LREG
16
;"1
7 0w-
l""-. ....
= ,-,/'-
- .-.,
¡'~'I 1"'-
C r';:'~
0 .-.,
I- '-,/'.
.-.,
'-,/'.
.-.,
~~.,
'-,/'.
~~~----- ----- 5\\'5 P0,1 S~l Plug"l' !(,,¡::g9'
r~~-- ------~ H-4-
1-"
1.-.
r';:'~ H-'=i
.-., -
,-,/'-
.-.,
~~~ H-5
,-,/'.
.-.,
'-,/'-
.-.,
,-,/'-
~
17
- H-2
~
33A-S Proposed P&A-I.doc
Date
PERFORA TION HISTORY
I Inten'aI I ,.\ccwn I
I I
Zone Top Btm i Ant spf, COIm1
lbg I~,"l'h ,NO' I ..e)(,' b' .. i ."'opt)'
I
(ÌI'c¡~(.l 3.230' 3.2:15' 5' .. PrO'lC)1
(jrcJSql: 3...00' 3.4-'5' 5' .. Propo~
H-2 10.836' 10.856' 20.' 4
H-2 I 0.861' I 10.871' 10.' 8
H-4 10.914' I 10.,930.' 16' 4 ! Isolara
H-5 10.938' IO.~' 8' 4 ! lsolata
H-5 10.962' 10.970.' I 8' 4 Ilsolatð
7/1.']993
7/1,'93
10..'90
10.'90
Ill'9Q
PBTD = 10,889' TD = 11,086'
!\lAX HOLE ANGLE = 27 deg.
DRA\VN B'Y: tcb
REVISED: 8/10/98
'0
Abandon ~
Alter casing 0
Change approved program 0
2. Operator Name:
Union Oil Company of California
3. Address:
PO Box 196247, Anchorage, AK 99516
7. KB Elevation (ft):
17' KB
1. Type of Request:
8. Property Designation:
Swanson River Unit
11.
Total Depth MD (ft):
11086'
Casing
Structural
ITotal Depth TVD (ft):
10855'
Length
Conductor
Surface
38'
3,315'
9,614'
Intermediate
Production
Perforate U Waiver U
Stimulate 0 Time Extension 0
Re-enter Suspended Well 0
5. Permit to Drill Number:
100-268 /
6. API Number: ~
50-133~1 Zo '24/-01
STATE OF ALASKA r"\
A~A OIL AND GAS CONSERVATION COM. .;SION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
Operational shutdown U
Plug Perforations 0
Perforate New Pool 0
4. Current Well Class:
Development [2]
Stratigraphic 0
Suspend U
Repair well 0
Pull Tubing 0
Exploratory 0
Service 0
9. Well Name and Number:
SCU 33A-08 /'
10. Field/Pools(s):
Swanson River Field/Hemlock
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (ft): Effective Depth TVD (ft):
10870' 10,659'
Size MD TVD
\f-J ~'"' "1 ( I I t-,",v"T
t) V:f 1l-/ f? ( 1-
Annular Dispos. U
Other 0
PIU9S (measured):
5,548'
Burst
JUnk (measured):
none
Collapse
18"
58'
58'
3,332'
9,537
10-3/4"
7-5/8"
3,332'
9,631'
5/23/2004
Date:
11,178' 10,939'
Tubing Size: ITUbing Grade:
2-7/8" L-80
Packers and SSSV MD (ft):
10,739'
13. Well Class after proposed work:
Exploratory 0 Development
15. Well Status after proposed work:
Oil 0 Gas 0 Plugged
WAG 0 GINJ 0 WINJ
1,253' 5-1/2"
Perforation Depth TVD (ft):
10,629 to 10,660
Liner
Perforation Depth MD (ft):
10,836 to 10,871'
Packers and SSSV Type:
2-7/8 x 7-5/8 Baker Mod F-1
12. Attachments: Description Summary of Proposal ~
Detailed Operations Program 0 BOP Sketch 0
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Philip J. Krueger Title Drilling Manager
Signature ~ / Á - Phone 907-276-7600 Date
/". ~'I r COMMISSION USE ONLY
629 psi
602 psi
1,580 psi
3,400 psi
466 psi 8,830 psi
Tubing MD (ft):
10,641'
0 Service 0
0 Abandoned 0
0 WDSPL 0
Contact
Steve Tyler 907-263-7649
SUndry Number: 3 ô ~ ./ D 9
[if
RECEIVED
APR - 7 2004
A'aska Oil & Gas Cons. Commission
Anchorage
D'œlÍ~f
Submit in Duplicate
Conditions of approval: Notify Commission so that a representative may witness
Plug Integrity 0
BOP Test 0
Other:
t (9 - c..J 07
Approved by
Mechanical Integrity Test
0
Location Clearance
COMMISSIONER
BY ORDER OF
THE COMMISSION
.---
"';~ONS °lJRVT~'"
4/1/2004
Proposed Abandonment #2
~
Soldotna Creek Unit
Well No. 33A-8
Actual Completion 8/18/98
,-...,
UNOCAL8
/1
CASING AND TUBING DETAIL
Size Wt Grade Conn ID Top Btm Hole Cmt Cmt Top
18" 23' 58' Dnven
10-3/4" 40.5 K-55 10.050 23' 3,332' 15" 2218 tt'Lead Surf
+ 150sx G
33.7 BTC 6.765 23' 85'
..1M.... N-80 BTC 6.969 85' 3,940'
33.7 BTC x 8rd 6.765 3940' 3,958' 323sx w/2.4% gel 5,926'
7-5/8" 29.7 8rd 6.875 3,958' 6,905' 9-%" CBL
33.7 S-95 8rd 6.765 6,905' 7,332'
DV Collar 7,332' 7,334'
33.7 S-95 8rd 6.765 7,334' 9,631' Lead 320sx G w/2.4% gel 8,736'
+ 100sxofG CBL
TOCIl1Tbg~ 5-1/2" 20 N-80 4.778 9,631' 11,178' 74 bbls of class 'G" 10,792'
5,548' CBL
Tagged on 8/18/01 Tubing
2-7/8" I 6.4 I L-80 I BTC SC I 2.441 I 17' I 10,764'
I JEWELRY DETAIL
I Collapsed Tbg @ I NO. Deoth ID OD .Item
7,651' 17' Shaffer, 3-1/2", 5M, Single Tubing Hanger CIW Type 'H' BPVP
Tagged on 7/16/01 3 5,540' 2.347 4.750 MeMurry Maceo, 2-7/8" SMO-l GLM, BK-2 wi Dummy
4 6,729' 2.347 4.750 MeMurry Macco, 2-7/8" SMO-l GLM, BK-2 wi Dummy
5 7,757' 2.347 4.750 MeMurry Macco, 2-7/8" SMO-I GLM, BK-2 wi Dummy
6 8,593' 2.347 4.750 McMurry Macco, 2-7/8" SMO-l GLM, BK-2 wi Dummy
7 9,180' 2.347 4.750 McMurry Macco, 2-7/8" SMO-l GLM, BK-2 wi Dummy
8 9,727' 2.347 4.500 McMurry Maeeo, 2-7/8" SMOR-l GLM S.C. BK-2 Empty
9 10,242' 2.347 4.500 McMurry Maeeo, 2-7/8" SMOR-l GLM S.C. BK-2 Empty
10 10,725' 2.347 4.500 McMurry Maeeo, 2-7/8" SMOR-l GLM S.C. BK-2 Empty
11 10,763' 2.375 4.00 Anehor Seal Assembly, E-22, 2.77'
The following were set on E-Line 10/31/90.
12 10,739' 3.000 4.437 Packer, 2-7/8 x 7-5/8" Baker Mod. 'F-l'
13 10,741' Millout Extension, 5.63' Long
14 10,747' I J1. 2-7/8" 6.5#, N-80, EVE 8 rd
~ 15 10,778' 2.250 Otis 'XN' Nipple, 2-7 IS" EVE 8rd, 2.313 w/ 2.25" N.G. wi Plug
in place.
16 10,779' 1 Pup Jt., 2-7/8", 6.5#, N-SO, EVE Srd
17 10,783' WLREG
,XN
16
H-4
H-5
PERFORA nON HISTORY
Interval Accwn.
Date Zone Top Btm Ant spf Comœnts
7/1/93 H-2 10,836' 10,856' 2rJ 4
7/1193 H-2 10,861' 10,871' 10' 8
10/90 H4 10,914' 10,930' 16' 4 Isolated
10/90 H-5 10,938' 10,946' 8' 4 Isolated
]0/90 H-5 ]0.962' ]0.970' R' 4 Toolated
17
- H-2
SWS POSt Set Plug @ 10,889'
H-5
PBTD = 10,889' TD = 11,086'
MAX HOLE ANGLE = 27 deg.
33A-8 Proposed P&A
DRAWN BY: tcb
REVISED: 8/20/98
UNOCAL8
Orig. RKB = 17'
58,J
3.332' -
..
~
,XN
17
33A-8 Proposed P&A
r--...
L
Proposed Abandonment #2
~
Soldotna Creek Unit
Well No. 33A-8
Actual Completion 8/18/98
Proposed Procedure
.
Jet cut tbg @ 5530' (10' above #3 GLM).
/'
.
Girculate/~pot an EW A.G volume of 10 ppg brine. /'
.
-
Jug test well~ore to 1500 psi. /'
.
POOH wI tbg & LD same.J
RU SL. RIH set Cavins Bridge Plug @ 3500'. RD SL. /'
.
.
RU Eline. RIH Perf csg @ 3340'. Establish circulation down 7-Sfa" csg, while taking
returns out 10-%" x 7-%" csg annuli. ".....
.
/'
RU cementers. Circulate cement down 7-5/8" csg.!!!! c.!!!,t r~s are @ surface. -r.
.
RU csg cutter. Cut 18", lO-%" & 7-%" csgjust above bottom of cellar. POOH LD
csg stubs.
.
Top off surface plug wI cement as necessary. Utilize a 2" PVC pipe to convey cmt
down.
/'
.
Weld abandonment plate onto conductor. Record GPS reading of well's position on
morning report.
/'
.
Dig out and remove cellar. Back fill hole to pad level.
DRAWN BY: tcb
REVISED: 8120/98
.
UNOCAL8
""",,
~
Soldotna Creek Unit
Well No. 33A-8
Actual Completion 8/18/98
':;;:
~
,....."
~«.t:
...(Sß
'......
..".
,....."
..".
~~,,:;
~~
¡'!'~
@
~~
'......
..".
'.....
æ
-
2
i
XN
16
17
33 A -8Current8-18-0 1
I Temporary Abandoned on 8/16/011 /'
CASING AND TUBING DETAIL
- 17' Size Wt Grade Conn ID Top Btm Hole Cmt Cmt Top
L 18" 17' 58' Driven
10-3/4" 40.5 K-55 10.050 17' 3,332' 15" 2218 tt'Lead 5urt
+ 150sx G
.2li.. BTC 6.765 17' 85'
26.4 N-80 BTC 6.969 85' 3,940'
..11L BTCx8rd 6.765 3940' 3,958' 323sx w/2.4% gel 5,926'
7-5/8" 29.7 8rd 6.875 3,958' 6,905' 9-Va" CBl
33.7 5-95 8rd 6.765 6,905' 7,332'
DV Collar 7,332' 7,334'
- 33.7 5-95 8rd 6.765 7,334' 9,631' Lead 320sx G w/2.4% gel 8,736'
+ 100sxofG CBl
5-1/2" 20 N-80 4.778 9,631' 11,178' 74 bbls of class "G" 10,792'
CBl
Tubing
2-7/8" I 6.4 l-80 I BTC 5C I 2.441 17' I 10,764'
~
JEWELRY DETAIL
NO, Depth ID OD Item
17' Shaffer, 3-1/2", 5M, Single Tubing Hanger CIW Type 'W
Collapsed Tbg @ I BPVP
7,651' I 2,239' 2.347 4.750 MeMurry Maeeo, 2-7/8" SMO-I GLM, BK-2 wi Dummy
Tagged on 7116/01
2 4,032' 2.347 4.750 MeMurry Maeeo, 2-7/8" SMO-I GLM, BK-2 wi Dummy
3 5,540' 2.347 4.750 MeMurry Maeeo, 2-7/8" SMO-I GLM, BK-2 wi Dummy
4 6,729' 2.347 4.750 MeMurry Maeeo, 2-7/8" SMO-I GLM, BK-2 wi Dummy
5 7,757' 2.347 4.750 MeMurry Maeeo, 2-7/8" SMO-I GLM, BK-2 wI Dummy
6 8,593' 2.347 4.750 MeMurry Maeeo, 2-7/8" SMO-I GLM, BK-2 wI Dummy
7 9,180' 2.347 4.750 MeMurry Maeeo, 2-7/8" SMO-I GLM, BK-2 wi Dummy
8 9,727' 2.347 4.500 MeMurry Macco, 2-7/8" SMOR-I GLM S.C. BK-2 Empty
9 10,242' 2.347 4.500 McMurry Macco, 2-7/8" SMOR-I GLM S.C. BK-2 Empty
10 10,725' 2.347 4.500 McMurry Macco, 2-7/8" SMOR-I GLM S.c. BK-2 Empty
11 10,763' 2.375 4.00 Anchor Seal Assembly, E-22, 2.77'
The following were set on E-Line 10/31/90.
12 10,739' 3.000 4.437 Packer, 2-7/8 x 7-5/8" Baker Mod. 'F-I'
13 10,741' Millout Extension, 5.63' Long
14 10,747' I Jt. 2-7/8" 6.5#, N-80, EVE 8 rd
15 10,778' 2.256 Otis ')(N' Nipple, 2-7/8" EVE 8rd, 2.313 wI 2.25" N.G. wI
Plug in place.
16 10,779' I Pup Jt., 2-7/8", 6.5#, N-80, EVE 8rd
17 10,783' WLREG
- H-2
PERFORATION HISTORY
Interval Aœwn
Date Zone Top Btm Ani; spf
7/1/93 H-2 10,836' 10,856' 2(J 4
7/1/93 H-2 10,861' 10,871' 1(J 8
10/90 H4 10,914' 10,930' 16' 4
10190 H-5 10,938' 10,946' 8' 4
]0/90 H-5 10.962' 10.970' 8' 4
Isolated
Isolated
Isolated
Cornnents
SWS POS! Set Plug@ 10,889'
H-4
H-5
H-5
PBTD = 10,889' TD = 11,086'
MAX HOLE ANGLE = 27 deg.
DRAWN BY: tcb
REVISED: 8/20/98
SCU 33A-8
Subject: $CU 33A-8
Date: Fri, 3 Aug 2001 09:34:06 -0800
From: "Bill Penrose" <bill@fairweather.com>
To: "Tom Maunder \(E-mail\)" <tom_maunder@admin.state.ak. us>
Tom,
This is to condense the lengthy discussion we had this morning concerning
Unocal's plans for the subject well. As indicated in the Sundry Notice, the
plan is solely to place sufficient cement to isolate the pressure coming
from the formation opposite the casing collapse and to abandon the bottom
part of the hole below the collapse. There is no intent to P&A or suspend
the well as there may be potential for future use of the remaining wellbore
and we'd like to keep that option open. (This well was the second best
producer in Swanson River before its mechanical problems caused it to be
shut in.)
SCU 33A-8 is one of three wells on the same pad and, whether or not the
wellbore is used in the future, it is anticipated that it's P&A will be
ultimately integrated into the P&A plans for the others.
As for the pressured interval at the depth of the casing collapse, I've been
doing some checking around. The drilling people who've drilled in SWanson
River over the years tell me that there has always been a spotty pressured
zone at about that depth. It isn't always encountered and, when it is, it
can even vary slightly in depth. The anecdotal evidence indicates the
pressured interval having been present before any waterflood was initiated,
so it must be a natural phenomenon.
If I can answer any additional questions, please let me know.
Regards,
Bill
I of I 8/3/01 10:28 AM
(c) The provisions of 20 AAC 25.112(a) - (c) and (e) - (i) apply to plugging a well
branch.
(d) This section does not apply to the temporary plugging of a well branch for
production control purposes.
History -
Eft. 11/7/99, Register 152
Authority -
AS 31.05.030
20 AAC 25.110
SUSPENDED WELLS.
(a) If allowed under 20 AAC 25.'105, the commission will, upon application by
the operator under (b) of this section, approve the suspension of a well if
(1) the well
(A) encounters hydrocarbons of sufficient quality and quantity to
indicate that the well is capable of producing in paying quantities, as
reasonably demonstrated by well tests or interpretive formation evaluation
data; for purposes of this paragraph, "paying quantities" means quantities
sufficient to yield a return in excess of operating costs;
-,~ (B) is a candidate for redrilling;
' ~' (C) has potential value as a service well; or
........ ~ (D) is located on a pad or platform with active producing or service
wells; and
(2) the operator justifies to the commission's satisfaction why the well
should not be abandoned, and, if the well is not completed, why the well should
not be completed; sufficient reasons include the
(A) unavailability of surface production or transportation facilities;
(B) imprudence of security maintenance of a completed well in a
shut-in status;
(C) need for po°l delineation and evaluation to determine the
prudence of pool development.
(b) An Application for Sundry Approvals (Form 10-403) must be submitted to and
approved by the commission before plugging operations are begun in a well for which
suspension is proposed, except that oral approval may be obtained from the commission
if it is followed within three days by the submission of an Application for Sundry
Approvals for final approval by the commission. Approval will be conditioned as
necessary to protect freshwater and hydrocarbon resources. An Application for Sundry
Approvals must include
(1) the reason for suspending the well and information showing that the
applicable criteria for suspension under (a) of this section have been met; and
(2) a statement of proposed work, including
40
I
I
I
I
I
I
i
I
I
I
I
I
!
I
I
I
I
I
I
~ (A) information on abnormally geo-pressured strata;
~ (B) the manner of placement, kind, size, and location, by measured
depth, of existing and proposed plugs;
(C) plans for cementing, shooting, testing, and removing casing;
(D) if the Application for Sundry Approvals is submitted after
beginning work, the name of the representative of the commission who
provided oral approval, and the date of the approval; and
(E) other information pertinent to suspension of the well.
(c) At the operator's request accompanying the submission, information submitted
to show that the applicable criteria for well suspension under (a) of this section have been
met will be kept confidential
(1) for the period specified under AS 31.05.035(c), if the information is
described in 20 AAC 25.071(b); or
(2) for the time that the information has value as a trade secret, if the
information is not described in 20 AAC 25.071 (b) but is determined by the
commission to constitute a trade secret under AS 45.50.940.
(d) A well approved for suspension must be plugged in accordance with the
requirements of 20 AAC 25.112, except that the requirements of 20 AAC 25.112(d) do
not apply if
.-~---~ (1) a wellhead is installed or the well is capped with a mechanical device to
seal the opening; and
(2) a bridge plug capped with 50 feet of cement or a continuous cement
plug extending 200 feet within the interior casing string is placed at or above 300
feet below the surface; the commission will waive the requirement of this
paragraph for a development well drilled from a pad or platform, if the
commission determines that the level of activity on the pad or platform assures
adequate surveillance of that development well.
(e) Until a suspended well has been abandoned or re-entered, the operator shall
maintain the integrity of the location, provide the commission with a well status report
every five years, and clear the location in accordance with 20 AAC 25.170(a)(2) or (b) or
with 20 AAC 25.172(c)(2) or (d), as applicable.
History -
Eft. 4/2/86, Register 97; am 11/7/99, Register 152
Authority -
AS 31.05.030
20 AAC 25.112
WELL PLUGGING REQUIREMENTS.
(a) Plugging of the uncased portion of a wellbore must be performed in a manner
that ensures that all hydrocarbons and freshwater are c6nfined to their respective
I
41
Unocal Corporation
P.O. Box 196247
Anchorage, AK 99501
Telephone (907) 263-7660
UNOCAL )
Dan Williamson
Drilling Manager
8/2/01
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Attn:
Re:
Commissioner Julie Heusser
Application for Sundry Approval;
SCU 33A-8 Suspension
Swanson River Field, Alaska
Dear Commissioner Heusser:
Unocal Alaska Resources hereby submits an Application for Sundry Approval for its plan to
set a cement plug in Well SCU 33A-8 in order to isolate a casing leak.
Previously, we had planned to convert this well to a rod pump completion. However, the well
was recently found to contain collapsed casing and tubing. The collapsed casing has an
attendant leak allowing formation pressure into the tubing x casing annulus.
Please find enclosed an Application for Sundry Approval (Form 403), a summary plugging
procedure and a wellbore schematic.
If you have any questions or require additional information, please contact Bill Penrose at
250-3113.
S' cerely, Z~
Dan Williamson
Drilling Manager
RECEIVED
/lU6 0 2 OOl
Alaska Oil & Gas Cons. Commission
Anchorage
AOGCC Sundry Cover Ltr
ORIGINAL
Bill Penrose
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [ ] Abandon '~Suspend [X] Plugging
[ ] Alter Casing [] Repair Well ] Pull Tubing
[ ] Change Approved Program [ ] Operation Shutdown ] Re- Enter Suspended Well
.
12.
Name of Operator
UNOCAL ALASKA RESOURCES
Address
909 W. 9th Avenue, P.O. Box 196247, Anchorage, AK 99519-6247
Location of well at surface
1959' FNL, 1987' FEL, Sec. 8, T7N, R9W, SM
At top of productive interval
2533' FSL, 1655' FEL, Sec. 8, T7N, R9W, SM
At effective depth
At total depth
2430' FSL, 1563' FEL, Sec. 8, T7N, R9W, SM
5. Type of well:
[X] Development
[ ] Exploratory
[ ] Stratigraphic
[ ] Service
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural N/A
Conductor 38'
Surface 3,315'
Intermediate 9,614'
Production N/A
Liner 1,253'
11,086 feet
10,855 feet
10,870 feet
10,659 feet
Plugs (measured)
Junk (measured)
] Time Extension [ ] Perforate
] Variance [ ] Other
] Stimulate
6. Datum Elevation (DF or KB)
17' AGL
7. Unit or Property Name
Soldotna Creek Unit
8. Well Number
33A-8
9. Permit Number
100-268
10. APl Number
50-133-2e2.5~
11. Field and Pool
Swanson River: Hemlock
10,870' (TOC, 19' cmt plug on bridge plug)
None
Size Cemented MD TVD
18" 55' 55'
10-3/4" 3,332' to surface 3,332' 3,332'
7-5/8" 643 sx in 2 stages 9,631' 9,537'
5-1/2" TD to liner top 11,178' 10,939'
Perforation depth: measured
True vertical
Tubing (size, grade and measured depth)
Packers and SSSV (type and measured depth)
10,836' - 10,856' and 10,861'- 10,871'
10,629' - 10,647' and 10,651' - 10,660'
2-7/8", L-80 at 10,783'
RECEIVED
/ U6 0 2' 2001
Alaska Oil & (?as Cons. Commission
Anchorage
5-1/2" Baker Model F-1 permanent packer at 10,739'
13. Attachments [X] Description of Sumary Proposal
14. Estimated date for commencing operation
8/8/2001
16.
If proposal was verbally approved
Name of approver N/A Date Approved
Contact Engineer Name/Number: Bill Penrose, 250-3113
] Detailed Operations Program
[ ] BOP Sketch
15.
Status of well classification as:
IX] Oil [ ] Gas
Service
[ ] Suspended
Prepared By Name/Number: Bill Penrose, 250-3113
17. I hereby c_~e~ify that the foregoing is true and correct to the best of my knowledge
Signed ~ ~ ~ L~i2..E.(_~ ~ ~'-
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
Date .,~/~./~, ~
IApproval No.,~)[-~
,,_, . V' G{'3JOY~¥8-'C'~ Plug integrity "~ BOP Test Location Clearance
Mechanical Integrity Test~ Subseque_nt fgrm r, equired 10- tA,~'~..
'in~ well ~V'e ..~zsr~r~:,.,c,n U,-~'~l c¢?l're I'n or~__ dec~ C~I~2/C~-).,~VZ~J c~ppL,~
Approved by order of the Commission OommissJoner
Form 10-403 Rev. 06/15/88 ORIGINAL SIGNED B'¢
Date O(~/O ~/~ /
Subrn'l't~ In Tri~)lic~te
UNOCAL
I
Soldotna Creek Unit
Well No. 33A-8
Actual Completion 8/18/98
CASING AND TUBING DETAIL
SIZE WT GRADE CONN ID TOP BTM.
18" - . . Surface 55'
10-3/4" 40.5 - - 10.050 Surface 3,332'
7-5/8" 33.7 N-80 BTC 6.765 15' 85'
26.4 N-80 BTC 6.969 85' 3,940'
33.7 N-80 BTC x 8rd 6.765 3940' 3,958'
29.7 N-80 8rd 6.875 3,958' 6,905'
33.7 S-95 8rd 6.765 6,905' 9,631'
5-1/2" 20 N-80 - '4.778 9,631''11,178'
Tubing
2-7/8" 6.4 L-80 BTC SC 2.441 17' 10,764' '
A
JStage
· Collar ~
7,332'
SWS Posi Set
Plug ~
10,889'
12'
13
14
· 15
16
B
H-2
H-4
H-5
H-5
·
JEWELRY DETAIL
NO. Depth ID OD Item
17' - - Shaffcr, 3-1/2", SM, Single Tubing Hanger CIW
1' 2,239' 2.347 4.75C
2 · 4,032' 2.347 4.750
3 5,540' '2.347 4.750
4 6,729' 2.347 4.750
5 7,757' 2.347 4.750
6 8,593' 2.347 4.750
7 9,180' 2.347 4.750
8 9,727' 2.347 4.500
9 10,242' 2.347 4.500
10 10,725' 2.347 4.500
11 10,763' 2.375 4.00
12 10,739' 3.000 4.437
13 10,741' - -
14 10,747' - -
15 10,778' ' 2.250 -
16 10,779'
17 10,783'
Type 'H' BPVP
McMurry Macco,
McMurty Macco,
McMurry Macco,
McMurry Macco,
McMurry Macco,
McMurry Macco,
McMurry Macco,
McMurry Macco,
McMurry Macco,
2-7/8" SMO-1 GLM, BK-2
2-7/8'.' SMO-1 GLM, BK-2
2-7/8" SMO-I GLM; BK-2
2-718" SMO-1 GLM, BK-2
2-718" SMO-1 GLM, BK-2
2-718" SMO-I GLM, BK-2
2-7/8" SMO-I'GLM, BK-2
2-718" SMOR-1 GLM S.C. BK-2
2-718" SMOR-1 GLM S.C. BK-2
McMurry Macco, 2-718" SMOR-1 GLM. S.C. BK-2
Anchor Seal Assembly, E-22, 2.77'
The following were set on E-Line 10/31)90.
Packer, 2-7/8 x 7-518" Baker Mod. 'P-l'
Millout Extension, 5.63' Long
1 Jt. 2-7/8" 6.5#, N-80, EUE 8 rd
Offs 'XN' Nipple, 2-7/8" EUE 8rd, 2.313 w/2.25"
N.G..
1 Pup Jt., 2-7/8",'6;5#, N-80, EUE 8rd
WLREG
Notes:
A
B
Stage Collar at 7,332'
Sclumberger Posi Set Plug at 10,889' wi 19' of cement.
..
,, i
PERFORATION HISTORY
7/1/93 H-2 10,836' 10,856' 20' 4
7/1/93 H-2 10,861' 10,871' 10' 8
10/90 H-4 10,914' 10,930' 16' 4 !Imlated
10/90 H-5 10,938' 10,946' 8' 4 Isolated
,
...... ! fig0.H-5 105J62' 10.970' 8' 4 Tmlnted
PBTD = 10,889' TD = 1i,086'
MAX HOLE ANGLE = 27 deg.
SCU 33A-8 Act'Draw
DRAWN BY: tcb REVISED: 8/20/95
UNOCAL
Soldotna Creek Unit
Well No. 33A-8
Well Suspension
Version: Summary
Objective:
Isolate damaged and leaking casing in Well SCU 33A-8 via placing a cement plug.
History:
The current gas lift completion was installed in SCU 33A-8 in August of 1998. In
May of 2000 production began falling off. In October of 2000, fill was found in the
tubing at 7,647' and the well pressured up even though there is a tubing plug set
below the packer. There is a casing leak that allows the annulus to build up to
1,500 psi when filled with water. It was suspected that this casing leak had
produced sand into the annulus and the tubing.
CTU diagnostic work and clean-out attempts in July 2001 indicated that the tubing
and casing are collapsed at 7,651'. The well can be circulated past this point in
the tubing, through the open GLM pockets at 9,727' and 10,242', and out the
annulus at the surface. Howbver, a 1-1/2" lead impression block would not pass
the collapsed spot in the tubing.
The decision was subsequently made to suspend the Well with cement in such a
way that the source of the high formation pressure at the casing collapse is
isolated with cement.
Current Status:
The well has been shut in since 10/00.
Notes:
Original RKB
Pore pressure:
26'
See 'Reservoir Pressure' below
Wellhead
Sundry Procedure Page 1 Of 3 8/2/2001/9:49 AM
UNOCAL
Soldotna Creek Unit
Well No. 33A-8
Well Suspension
Version: Summary
Tubing head is a Shaffer KD 75L1, 11" 5M X 9" 5M
2 Master valves: FMC-OCT, M/20, 3-1/8" 5M, R-Trim, HWO
Tree cap: Thornhill Craver, Unibolt, 3-1/8 5M w/3-1/2" EUE lift threads
Reservoir Pressure
Current Perforations Open:
H-2 Sand 10,836' - 10,856' MD, 10,621' - 10,640' TVD
10,861' - 10,871' MD, 10,644' - 10,653' TVD
estimated formation pressure = 1,500 psi
Casing Leak:
Collapsed Csg
_+7,651' MD, 7,625' TVD
estimated formation pressure = 4,700 psi
General Well Information
See attached wellbore schematic.
The bottom 3 gas lift valves have been pulled, leaving the pockets empty.
There is a plug in the tubing tailpipe at 10,778'.
Procedure:
Ch~:..~.:~k and record tubing and annulus pressures. Set tanks and rig lines'to take returns
from the annulus to tanks through a choke. Set a tank filled with lease water for
circulating down the tubing.
2. MIRU cementing unit and rig to pump down the. tubing. Pressure test lines to 5,000 psi.
.
.
.
.
Holding 1,500 psi back pressure on the annulus, establish circulation down the tubing to
ensure cement can be circulated around.
Pump down tubing 154 bbls of Class G cement with additives. 't'~
Use the choke on the annulus return line to hold 1,500 psi back pressure on the annulus
while taking returns to tanks.
Follow cement with 36.5 bbls of lease water to place the top of cement in the annulus
and tubing at 6,300'.
7. WOC.
Sundry Procedure Page 2 of 3 8/2/2001/9:49 AM
UNOCALe
Soldotna Creek Unit
Well No. 33A-8
Well Suspension
Version: Summary
Bleed down pressure on annulus and tubing to ensure cement has isolated the casing
leak.
.
R/U slickline and make a gauge ring run to the top of cement in the tubing. Record tag
depth. POOH w/gauge ring.
10. R/D cementing and slickline equipment and tanks. Clean up location.
Sundry Procedure Page 3 of 3 8/2/2001/9:49 AM
FW: Swanson Wort(over Program
·
Subject: FW: Swanson Workover Program
Date: Thu, 3 May 2001 08:47:11 -0800
From: "Bill Penrose" <bill@fairweather.com>
To: "Tom Maunder \(E-mail\)" <tom_maunder@admin.state.ak. us>
Tom,
For your information and records:
This is the same e-mail I sent you on 5/1/01 except that I've changed the
discussion of BOPE to be used when running rods in the rod pump conversions.
Please dispose of that previous message as the BOP discussion was
grieviously in error.
Thanks!
Bill
.... Original Message ....
From: Bill Penrose [mailto:bill~.fairweather. com]
Sent: Tuesday, May 01,2001 8:57 AM
To: Tom Maunder (E-mail)
Subject: RE: Swanson Workover Program
Tom,
Following each question that you posed is the answer, preceded with an A:
One big question. What rig is proposed?
A: H&R Rig #9, being imported from Canada.
.SRU 14-15...
-What are the BHPs of the old interval and the new? Unless there is a
possibility of a high pressure zone (there. are a few out there), 3000 psi
sounds appropriate.
A: BHP of the old interval is 4,900 psi and will only flow water. The BHP
of the new interval is 3,000 psi and is expected to flow gas. The request
for testing the BOPs to only 3,000 psi as well as not installing an SSV is
an artifact from one of the other programs. Please disregard it. It is our
intention to test the BOPs to 5,000 psi.
-You request not to have a SSV since the well will not flow unassisted, but
this is a gas well. Is the SSV request an artifact from another program?
A: Yes, as stated above, the SSV request is an artifact. Please disregard
it.
-Do you plan to do a casing test in the pre rig work or prior to perfing?
A: We will perform a casing test after plugging the presently perforated
interval.
-How the well will look after workover is not too difficult to imagine, but
a
drawing will help as I move it up the line.
A: I will generate proposal drawings ASAP and get them to you.
-What gas rate is expected? Will 2-3/8" tubing limit the production?
^: The gas rate is expected to be ~2MMSCFD which will not be limited by the
2-3/8" tubing.
1 of 4 5/3/01 10:05 AM
FW: Swanson Workover Program
-What zone/sand is the new completion in?
A: The Tyonek 62-5 Sand
SRU 234-15...
-This plan is pretty straight forward. You have the BHP of the intended
zone. Are there any others of concern?
A: No, we'll just reperf the existing perforated intervals.
-The present packer is a fair distance above the PBTD. Fill is mentioned,
has it been tagged?
A: No tag run has been made since this interval was perforated. However,
the well makes sand so there is probably some amount of fill.
-Do you plan to do a casing test in the pre rig work or prior to reperfing
and gravel packing?
A: No. The perforations are open and the producing pressure will be very
Iow.
-Although you have larger tubing planned for this well, will it limit
production?
A: No. There will not be enough rate from this well to see the tubing as a
limitation.
SRU 14A-33...
-As I indicate in my comments...is there any intent or need to clean out the
deeper intervals?
A: No. We'll just acidize the existing perfs.
-You are requesting not to have a SSV on a gas lifted completion. As nOted
above, will adding the G perfs make the well capable of flowing?
A: No. The BHP in the G-Zone is 1600 psi and will not allow the well to
flow.
-If the request for no SSV is apprOved, is there some shutdown mechanism on
the gas lift?
A: There are 2 manual valves at the surface for shutting in the gas lift.
While discussing this question, the field supervisor and I decided that we
are. uncomfortable with the possibility of a line leak occuring some time
before somebody notices and turns off the gas lift gas supply. We therefore
withdraw the request to eliminate the SSV.
-What are the BHPs.
A: Hemlock BHP = 1500 psi, G Zone BHP = 1600 psi
I would appreciate some detailed information regarding the downhole
equipment
and the surface pumping unit.
A: Photos and diagrams attached to this message. I can provide more
technical data if you'd like,
SCU 33A-8...
How high Will the tie back be?
A: The casing leak is suspected to be at the port collar at 7,332'. The
tie-back liner will extend up to cover it, making the tie-back -2500' long.
If the leak is found elsewhere, it will effect the length of the liner as
the intent is to tie back from the existing TOL to just above the leak.
2 of 4 5/3101 10:05 AM
.Swanson Workover Program
Subject: Swanson Workover Program
Date: Wed, 25 Apr 2001 03:02:30 EDT
From: STMaunder@aol.com
To: bill@fairweather.com
CC: tom_maunder@admin.state.ak.us
Bill,
Doing a little homework. Funny, the phone doesn't ring near as much here.
But the new office doesn't have plumbing problems either. But I digress...
I have some questions with regard to the programs. I'll start off with my
cryptic diary notes and expand on them.
One big question. What rig is proposed? ~,~~.~ ~-~ ~ ~--~,- ~
SRU 14-15...(191-237)...(301-106)...proposal is to clean out the well,
abandon the existing perforations and recomplete...request to test BOP to
3000 psi and also not to have a SSV...say that the well won't flow...plan to
recomplete as a gas well...might need proposed drawing
-What are the BHPs of the old interval and the new? Unless there is a
possibility of a high pressure zone (there are a few out there), 3000 psi
sounds appropriate.
-You request not to have a SSV since the well will not flow unassisted, but
this is a gas well. Is the SSV request an artifact from another program?
-Do you plan to do a casing test in the pre rig work or prior .to perfing?
-How the well will look after workover is not too difficult to imagine, but a
drawing will help as I move it up the line.
-What gas rate is expected? Will 2-3/8" tubing limit the production?
-What zone/sand is the new completion in? ~ ~o~ .~
SRU 234-15...(160-041 )...(301.102)... propOsal is to clean out the well,
reperf and gravel Pack the interval and run tubing...BHP stated at 2785
psi...request 3000 psi BOP test...need a new drawing...no mention of deleting
-This plan is pretty straight forward. You have the BHP of the intended ,,~
zone. Are there any others of concern?
-The present packer is a fair distance above the PBTD. Fill is mentioned,
has it been tagged?
-Do you plan to do a casing test in ~the pre rig work or prior to reperfing
and gravel packing?
-AIthoughproduction?yOu have larger tubing planned for this well, will it limit ~'~
SRU 14A-33...(162-017)...(301-103)...proposal is to cut tubing above top
packer and clean out the well, not necessary or possible to clean out ~e~
deeper...run tubing shallower, acidize the existing perfs and add G zone
perfs..:this is.an oil.well and presently will not flow unassisted...request
is to not have a SSV...how do they propose to Sl...will adding the G perfs
make the well flow?
1 of 2
-As I indicate in my comments...is there any intent or need to clean out.the
deeper intervals?
-You are requesting not to have a SSV on a gas lifted completion. As noted
~,l~Wi;ll I~UII ¥¥U| RUYt~I rlU~l
above, will adding the G perfs make the well capable of flowing?
-If the request for no SSV is approved, is there some shutdown mechanism on
the gas lift?
-What are the BHPs.
The proposed rod pump wells have similar comments. I did talk with Steve
Tyler regarding this proposal some time ago. I would appreciate some
detailed information regarding the downhole equipment and the surface pumping
unit. I have just copied my notes regarding these wells. I don't think they
are too cryptic. If you need further clarification, please call
SCU 33A-8...(172-017)...(301-103)...proposal is to clean out the well,
repairing a 7-5/8" casing leak by runing a 5" tie back and equipping with a
rod pump...makes same request to omit SSV...probably more appropriate on this
well type...how high will the tie back be?. . .will ' it be fully cemented?...BOP
and contingencies when using crane?...is there any liklihood that the Hemlock
could flow after reperfing?...need BHPs...will tubing be anchored?...will gas
be produced out of a casing valve?
SCU 33-33...(176-056)...(301-105)...somewhat similar to 33A-8, plan to clean
the well out and complete with rod pump...request relief on SSV as
before...plan to use base oil for workover fluid...no reperf...why base oil
on this one?...Hemlock and G zones already open in this well...any plan to
test the casing?
SCU 13-34...(unsure of permit number)...(301-104)...cleanout and equip with
pump...plan to add G zone perfs...similar requests as before...plan to use 6%
KCl for fluid
Bill, thanks in advance for looking at these comments/questions. Please call
to discuss.
Tom
2 of 2 4/25101 9:49 AM
FW: Swanson Workover Program
Will it be fully cemented?
A: Yes.
BOP and contingencies when using crane?
A: We plan to use a 2-ram stack consisting of:
Top: 2-7~8", 1500 psi WP, 0 - 1-1/2", variable rod rams
Btm: 2-1/2", Model LP-15, 0 - 1-1/2", variable rod rams
Each well will use both rams while running the rods, with the bottom set
being left on the well as a permanent part of the wellhead equipment (i.e.,
when it's all done, each well will have an LP-15 BOP left on it and the top
ram will be left over for future use in running and pulling rods.).
Is there any liklihood that the Hemlock could flow after reperfing?
A: No, the BHP is only 1500 psi, not enough to lift the oil column.
Need BHPs
A: BHP = 1500 psi.
Will tubing be anchored?
A: Yes, see the attached gas anchor schematic.
Will gas be produced out of a casing valve?
A: Yes.
SCU 33-33
Why base oil on this one?
A: Base oil is being used because the G-Zone is very water-sensitive.
Any plan to test the casing?
A: No, the perforations are open and the producing pressure will be very
Iow.
~ SCU 13'34
BHP = 1500 psi.
Please call or write with any additional questions or comments.
Regards,
Bill
I Name: 1100SlDE&FRTVIEWBELTOUT.jpg
r~,~1100SIDE&FRTVIEWBELTOUT.jp.q~t Type: JPEG Image (image/jpeg)
i! Encoding: base64
I Name: 1100SIDE&FRTVIEWBELTOUT.jpg
F~-.~ 1100SIDE&FRTVIEWBELTOUT.jpgt Type: JPEG Image (image/jpeg)
' ~l Encoding: base64
~ 1100SI DEVIEW.jP.q :I Encoding: base64
Name: 1100SIDEVIEW.jpg
Type: JPEG Image (image/jpeg)
3 of 4 513101 10:05 AM
FW: Swanson Workover Program
IName: 900FOLDEDSHIPMENT.jpg ]
I [-~900FOLDEDSHIPMENT. ip~ Type: Image (image/jpeg)
JPEG
Encoding: base64 .
~ 900WEIG HT BOX. jp.q
Name: 900WEIGHTBOX.jpg
Type: JPEG Image (image/jpeg)
Encoding: base64
SwansonGas Anchor. doc
Type: WINWORD File (application/msword)1
Name: Swanson Gas Anchor.doc
Encoding: base64
4 of 4 5/3/01 10:05 AM
Swanson River
"Poor Boy" Gas Anchor
Casing I
2-7/8" Tubing
Rods
RXBC Rod Pump
Gas breaking out
of production
ISeating Nipple, 2-7/8" Cup Type
w/2.280" ID
IProduction
2-7/8" Ported Sub
1.660" Dip Tube w/10 rd
Box x ~ MS btm
3 jts of 2-7/8" Tail Pipe
Production
I2-7/8" Otis "R" type Profile Nipple w/plug,
2.188" ID
I2-7/8" Ported Sub
IProduction
LocSet Packer w/o
Element
JPEG image 768x1024 pixels
1 of 2 5/3/01 10:09 AM
1
4
10
103
2
10 -}'
1
10
0
10
-1
10
-2
10
-3
10
1000
Water
Cum Oil Prod ( Mbbl )
Cum Gas Prod ( MMcf )
Cum Water Prod ( Mbbl )
0.01
1990
01
0.001
Unocal Corporation
P.O. Box 196247
Anchorage, AK 99501
Telephone (907) 263-7677
UNOCAL )
Dan R. Williamson
Drilling Manager
Tuesday, April 17, 2001
Ms. Julie Heusser, Commissioner
AOGCC
333 West 7th Ave., Suite 100
Anchorage, Alaska 99501
Application for Sundry Approval;
SCU 33A-8 Workover
Swanson River Field, Alaska
Dear Commissioner Heusser,
Unocal Alaska Resources hereby submits an Application for Sundry Approval for its plan to repair
Well SCU 33A-8 and convert it to a rod pump completion.
SCU 33A-8 is a shut-in, Iow rate'~emlock oil producer that has a leak in the 7-5/8" production
casing. The proposed workover will consist of pulling the old completion, locating the casing leak,
~.,,~cementing a 5" tie-back liner across the leak and re-competing with a rod pump c~o..~pletion. The
Hemlock will be re-perforated before running rods.
Because this well will not flow unassisted after the casing leak is repaired, Unocal requests
approval to re-complete this well without a surface safety valve.
The anticipated commencement of this workover is approximately June 15.
Please find enclosed an Application for Sundry Approval (Form 403), a summary workover
procedure and a wellbore schematic.
If you have any questions or require additional information, please contact Bill Penrose at 258-
3446.
Sincerely, ~~,~
Dan Williamson
Drilling Manager
Enclosures
cc: Bill Penrose
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
i. Type of Request: [ ] Aband'on [ ] Suspend [ ] Plugging [ ] Time Extension [X] Perforate
[ ] Alter Casing [X] Repair Well [X] Pull Tubing [ ] Variance IX] Other*
[ ] Change Approved Program [ ] Operation Shutdown [ ] Re- Enter Suspended Well [ ] Stimulate *Convert to rod pump
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF Or KB)
UNOCAL ALASKA RESOURCES IX] Development 17' RKB
[ ] Exploratory
3. Address [ ] Stratigraphic 7. Unit or Property Name
909 W. 9th Avenue, P.O. Box 196247, Anchorage, AK 99519-6247 [ ] Service Soldotna Creek Unit
4. Location of well at surface '/" ~ ~ 8. Well Number
1959' FNL, 1987' FEL, Sec. 8, T7N, R9W, SM 33A-8
At top of productive interval 9. Permit Number
2533' FSL, 1655' FEL, Sec. 8, T7N, R9W, SM 72-0017-1
At effective depth 10. APl Number
50-133-2024101
At total depth 11. Field and Pool
2430' FSL~ 1563' FEL~ Sec. 8~ T7N~ R9W~ SM Swanson River: Hemlock
12. Present well condition summary
Total depth' measured 11,086 feet ~ Plugs (measured) 10,870' (TOC, 19' cmt plug on bridge plug)
true vertical 10,855 feet
Effective depth: measured 10,870 feet Junk (measured) None
true vertical 10,659 feet
Casing Length Size Cemented M D TVD
Structural N/A
Conductor 38' 18" 55' 55'
Surface 3,315' 10-3/4" 3,332' to surface 3,332' 3,332'
Intermediate 9,614' 7-5/8" 643 sx in 2 stages 9,631' 9,537'
Production N/A
Liner 1,253' 5-1/2" 1.253' to liner top 11,178' 10,939'
Perforation depth: measured 10,836'-10,856' and 10,861'-10,871' ~'~'""~'~
,~ ~ ~, :~. - ,,, ,,
_
true vertical 10,629'-10,647' and 10,651'-10,660' ./.~o,O ,, ,.,,..,....,~!!. :...'
Tubing (size, grade and measured depth) 2-7/8", L-80 at 10,783' ' q,,~.~,,:;,.~.
~ ~' ' "~' ~'Oh
Packers and SSSV (type and measured depth) 5-1/2" Baker Model F-1 permanent packer at ~ ~,~o~ .... , ..... ,,,,.?/~,,.
13. Attachments iX] Description of Sumary Proposal '" [ ] Detailed Operations Program [ ] BOP Sketch
, ,,, ,,, ,
14. Estimated date fo~ commencing operation ' 15. Status' Of well classification as:
6/15/01
, ,
16. If proposal was verbally approved [X] Oil [ ] Gas [ ] Suspended
..... Name of approver Date Approved Service ....
1'7.
I hereb/y~.~rtify th.at thee f~r~going is true and correct to the best of m~ knowledge '
Sign~,)/" ~
~. Title ~)l~'/t ~,~..~/~ Date .~/'~, ""'/.~.-'~/
- - -,- r " '~ Con'mission I.l~e Only
Conditions of Approval: Notify Commission So representative may witness '~.~,~ .~ ~>~ ~.~-~-.- IApproval No. '~
Plug integrity BOP Test ~ Location Clearance
' ~ Subsequent form required 10- ~,t ~.~--~
~, ~ ~-~ ~,~'~s'~" Mechanical Integrity Test .
Gll~, SIGNED BY' ,
Approved by order of the Commission ,, ~!~ ~ ~,,a~,, Commissioner , Date (~',,Fp ~ [
Form 10-403 Rev. 06/15/88
51icate
Unocal Alaska Business Unit
Sxvanson River Field
Well # SCU 33A-8 AFE #
Prepared by: WJP Date: 3/01 ~
Estimate for Non-drilling AFEs (Cap Recomp, SWR, Abandonment)
No. Preliminary' Procedure Time CUM cuM
Estimate Time Time
(Hours) (Hours) (Days)
i
Prep Well for Workover
Test wellhead
Attempt Coiled Tubing Cleanout in Tubing and AnnUlus '"
Use Slickline and Pumper to Clean Out Annulus
Workover
1 MIRU Workover Rig. 72 72 3.0
2 Set BPV, N/D Tree, N/U BOPE and Test 15 87 3.6
3 R/U ACRS, Cut Tbg, R/D APRS 4 9] 3.8
4 M/U Landing Joint, Pull Tbg Hgr to Floor, Circulate ..Well 3 94 3.9
5 POH and L/~.. Tubing and Jewelry 15 109 4.5
6 P/U Drill Pip.e and Overshot and RIH. 20 129 5.4
7 Eng. age Stub: Attempt to Rotate.Tbg Anchor, POH ... 8 137 5.7
8 !Make 7-5/8" Scraper Run to 5" Lnr Top, POH 12 149 6.2
9 RIH w/RTTS, Locate Casing Leak in 7-5/8" Csg, POH 12 161 6.7
10 IRun and Cement Tie-Back Liner to Cover Casing Leak 24 185 7.7
1..1 Make Cleanout Run in 7-5/8" C..s.g, POH ... 6~' 191 8.0
12 tS'et Storm Pkr, N/D BOPE, Add Spool to Wellhead, N/U & T~st BOPE 18 209 8.7
1'3 M,ake Cleanout Run in 5-1/2" Liner, Displace Well tO .Clean Brine, POH 18 227 9.5
14 RIH w/Slickline, Pull Plug from T.bg Tail , 4; 231 9.6
15 P/U and RIH w/2-7/8" Completion to 10,700; .. 24 255 10.6"'
1,6 Set,BPV, N/D BOPE, N/UTree, TestTree 12 ..267 11.1
17 RDMO W0rkover Rig ..... 0 267 11.1
I I I III I
Post Rig Work
MIRU Slickl'.me Unit, .Tag Fill
if Fill Covers Perfs, MIRU CTU and Clean Out to PBTD . .' . . '"
MIRU SWS, Reperforate Hemlock, RDMO SWS
Run Rod Pump and Rods Us'rog 50-Ton Crane
[Subtotal (Days)
LosS/Trble'Thne (11%)
T°tal Project Days
..
i i i i ii i i iiiiii ii i i
11.13
1.22
Note:
Loss, Trouble, Unplanned is based on 11%.
Also, the risked troubled costs were included in the AFE costs.
12.35
SCU 33A-8 AFE Est Page I of I 4/5/01
UNOCAL
17'
SIZE
18"
10-3/4"
7-5/8"
5-1/2"
Tubing
2-7/8"
Soldotna Creek Unit
Well No. 33A-8
Actual Completion 8/18/98
CASING AND TUBING DETAIL
GRADE CONN ID
. .
40.5 -
33.7 N-80 BTC
26.4 N-80 BTC
33.7 N-80 BTC x 8rd
29.7 N-80 8rd
33.7 S-95 8rd
20 N-80
6.4
L-80 BTC SC
TOP BTM.
Surface 55'
10.050 Surface 3,332'
6.765 15' 85'
6.969 85' 3,940'
6.765 3940' 3,958'
6.875 3,958' 6,905'
6.765 6,905' 9-~3+'
4.778 9,631' 11,178'
2.441 17' 10,764'
A
Smsa
Co)la' ~
7,332'
SWS Posi Sci
Plug ~
10,889'
11
12
14
15
16
H-2
H-4
H-5
H-5
NO.
JEWELRY DETAIL
Depth I__D_D .OD
17' - -
1' 2,239' 2.347 4.750
2 . 4,032' 2.347 4.750
3 5,540' '2.347 4.750
4 6,729' 2.347 4.750
5 7,757' 2.347 4.750
6 8,593' 2.347 4.750
7 9,180' 2.347 4.750
8 9,727' 2.347 4.500
9 10,242' 2.347 4.500
10 10,725' 2.347 4.500
11 10,763' 2.375 4.00
!rein
Shaffer, 3-1/2", 5M, Single Tubing Hanger CIW
Type 'H' BPVP
McMurry Maceo, 2-7/8" SMO-1 GLM, BK-2
McMurry Mae¢o, 2-7/8'.' SMO-1 GLM, BK-2
McMurry Ma~¢o, 2-7/8" SMO-1 GLM, BK-2
McMurty Maceo, 2-7/8" SMO-1 GLM, BK-2
McMurry Mae¢o, 2-7/8" SMO-1 GLM, BK-2
McMurty Maeco, 2-7/8" SMO-1 GLM, BK-2
MCMurry Mae¢o, 2-7/8" SMO-1 GLM, BK-2
McMurry Ma¢¢o, 2-7/8" SMOR-1 GLM S.C. BK-2
McMutry Ma¢¢o, 2-7/8" SMOR-1 GLM S.C. BK-2
McMutry Maeeo, 2-7/8" SMOR, 1 GLM S.C. BK-2
Anchor Seal Assembly, E-22, 2.77'
12
13
14
15
16
17
10,739' 3.000 4.437
10,741' -
10,747' - -
10,778' · 2,250 " -
10,779'
10,783'
The following were set on E-Line 10131/90.
Packer, 2-7/8 x 7-5/8" Baker Mod. 'F-I'
Millout Extension, 5.63' Long
1 Jr. 2-7/8" 6.5#, N-80, EUE 8 rd
Otis 'XN' Nipple, 2-7/8" EUE 8rd, 2.313 wi 2.25"
1 Pup Jr., 2-718", 6.5#, N-80, EUE 8rd
WLREG
Notes:
A
B
Stage Collar at 7,332'
Sclumberger Posi Set Plug at 10,889' wi 19' of cement.
PERFORATION HISTORY
.,
711/93 H-2 10,836' 10,856' 20' 4
7/I/93 H-2 10,861' 10,871' 10' 8
, . .
,
1(1/90 I-I-4 10,914' 10,930' 16' 4 Isdated
..
10/90 H-5 10,938' 10,946' 8' 4 Isdated
I0/90 1-1-5 10.062: . 1.0.qT0' .8' 4 I~lated
PBTD = 10,889' TD = 11,086'
MAX HOLE ANGLE = 27 deg.
SCU 33A-8 Act Draw DRAWN BY: tcb REVISED: 8/20/98
TONY KNOWLE$, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192)
PHONE: (907) 279-1433
FAX: (907) 276-7542
December 6, 1999
Dan Williamson
Drilling Manager
UNOCAL
P O Box 196247
Anchorage, Alaska 99519
Re: Permit Number Ltr Dated October 11, 1999
Dear Mr. Williamson:
AOGCC history database had a problem with six duplicate permit numbers that
occurred several years ago. The current listed well permits were not issued by
AOGCC. We added a seventh digit to the permit number and inturn created a
database problem. I corrected this situation by changing the permit number to a new
Y2K seven-digit permit number.
The new Y2K permit number (first six digits) should be annotated on all reports
submitted to AOGCC for these named wells in the future:
Current Permit
Well name
66-0056-1 Granite Pt St 31-14RDi 100-265-0
66-0056-2 Granite Pt St 31-1.4RD2 100-266-0
74-0026-1 Soldotna Ck Unit 32B-09 100-267-0
72-0017-1 Soldotna Ck Unit 33A-08 100-268-0
80-0107-1 Soldotna Ck Unit 41B-09 100-269-0
68-0044-1 Trading Bay Unit G- 12RD 100-270-0
New Y2K Permit Number
The permit number changes were made December 5, 1999 by AOGCC.
Sincerely,
Steve McMains
Statistical Technician
O STATE OF ALASKA
ALASKA IL AND GAS CONSERVATION MMISSION
REPORT OF SUNDRY WELL OPERATIONS
1 .' Operations performed: Operation shutdown: Stimulate: Plugging: Perforate:
Pull tubing: X Alter casing: Repair well: Other:
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB)
Union Oil Company of Califomia (UNOCAL) Development: X 154' RKB MSL feet
3. Address Exploratory: 7. Unit or Property name
Stratigraphic:
P.O. Box 196247, Anchorage, AK 99519 Service: Soldotna Creek Unit
4. Location of well at surface 8. Well number
1959' FNL, 1,987' FEL, Sec. 8, T7N, R9W, SM SCU 33A-8
At top of productive interval 9. Permit number/approval r~mber
2,533' FSL, 1,655' FEL, Sec. 8, T7., R9W,SM ~'~ ~ '" (~ / ¢7 '"'/ ~/~
At effective depth 10. APl~ number
2,457' FSL, 1,587' FEL, Sec. 8, T7N, Rgw, SM 50- 133-20241-01
At total depth 11. Field/Pool
2,430' FSL, 1,563' FEL, Sec. 8, T7N, Rgw, SM Swanson River Field/Hemlock
12. Present well condition summary
Total depth: measured 11,178' feet Plugs (measured) 10,889-10,910' MD
true vertical 10,935' feet
Effective depth: measured 10,889' feet Junk(measured) ORIGINAL
true vertical 10,670' feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor 58' 18" Driven 22' 22'
Surface 3,332' 10-3/4" 150 sx 3,332' 3,332'
Intermediate
Production 9,993' 7-5/8" 743 sx 9,993' 9,864'
Liner 1,547' 5-1/2" 360 sx 9,631 '-1 t, 178' 9,631 '-10,935'
Scab Liner
Perforation depth: measured
true vertical
10,620'-10,640'; 10,648'-10,635'
Tubing (size, grade, and measured depth) ~1 .,,; .,,,....:
2-7/8",604#, L-80, Buttress Special Clearance
·
Packers and SSSV (type and measured depth)
Baker Model F-1 ~ 10,762' MD
13. Stimulation or cement squeeze summaw
N/A
Inte~als treated (measured)
N/A
Treatment description including volumes used and final pressure
N/A
14. Representative Daily AvemRe Production or Iniection Data
OiI-BBL Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 7/16/98 291 2 mmcfd 64 550 500
Subsequent to operation 9/28/98 297 1.3 mmcfd 56 700 275
15. Attachments: 16. Status of well classification as:
Copies of Logs and Su~eys run:
Daily RepoA of Well Operations: ~ ' Oil: X Gas: Suspended: Se~ice:
17. I hereby ceAify that the foregoing is true and correct to the best of my knowledge:
' r ,~,
Sign · D n Williamson Title: Drilling Manager Date:
Form 10-404 Rev 06/15/88
suBt~
)UPLICATE
UNOCALe
Orig. RKB = 17'
A
Stage
Collar ®
7,332'
11
12
13--
14
15
16
SWS Posi Set
r~ug @ B
10,889'
H-2
H-4
H-5
H-5
SIZE
Soldotna Creek Unit
Well No. 33A-8
Actual Completion 8/18/98
CASING AND TUBING DETAIL
WT GRADE CONN ID
TOP BTM.
1 8"
10-3/4"
7-5/8"
5-1/2"
Tubing
2-7/8"
40.5 - -
33.7 N-80 BTC
26.4 N-80 BTC
33.7 N-80 BTC x 8rd
29.7 N-80 8rd
33.7 S-95 8rd
20 N-80
6.4 L-80 BTC SC
Surface 55'
10.050 Surface 3,332'
6.765 15' 85'
6.969 85' 3,940'
6.765 3940' 3,958'
6.875 3,958' 6,905'
6.765 6,905' 9,631'
4.778 9,631' 11,178'
2.441 17' 10,764'
JEWELRY DETAIL
NO. Depth ID OD Item
17'
1 2,239' 2.347 4.750
2 4,032' 2.347 4.750
3 5,540' 2.347 4.750
4 6,729' 2.347 4.750
5 7,757' 2.347 4.750
6 8,593' 2.347 4.750
7 9,180' 2.347 4.750
8 9,727' 2.347 4.500
9 10,242' 2..347 4.500
10 10,725' 2.347 4.500
11 10,763' 2.375 4.00
12 10,739' 3.000 4.437
13 10,741' -
14 10,747' -
15 10,778' 2.250 -
16 10,779'
17 10,783'
Shaffer, 3-1/2", 5M, Single Tubing Hanger CIW
Type 'H' BPVP
McMurry Macco, 2-7/8" SMO-1 GLM, BK-2
McMurry Macco, 2-7/8" SMO-1 GLM, BK-2
McMurry Macco, 2-7/8" SMO-1 GLM, BK-2
McMurry Macco, 2-7/8" SMO-1 GLM, BK-2
McMurry Macco, 2-7/8" SMO-1 GLM, BK-2
McMurry Macco, 2-7/8" SMO-1 GLM, BK-2
McMurry Macco, 2-7/8" SMO-1 GLM, BK-2
McMurry Macco, 2-7/8" SMOR-1 GLM S.C.
McMurry Macco, 2-7/8" SMOR-1 GLM S.C.
McMurry Macco, 2-7/8" SMOR-1 GLM S.C.
Anchor Seal Assembly, E-22, 2.77'
BK-2
BK-2
BK-2
The following were set on E-Line 10/31/90.
Packer, 2-7/8 x 7-5/8" Baker Mod. 'F-I'
Millout Extension, 5.63' Long
1 Jr. 2-7/8" 6.5#, N-80, EUE 8 rd
Otis 'XN' Nipple, 2-7/8" EUE 8rd, 2.313 w/2.25"
N.G.
1 Pup Jr., 2-7/8", 6.5#, N-80, EUE 8rd
WLREG
Notes:
A
B
Stage Collar at 7,332'
Sclumberger Posi Set Plug at 10,889' w/19' of cement.
PERFORATION HISTORY
Interval Ae. em~
Date Zone Top Btm Ant spf Con~nents
7/1/93 H-2 10,836' 10,856' 20' 4
-
7/1/93 H-2 10,861' 10,871' 10' 8
10/90 H4 10,914' 10,930' 16' 4 Isolated
10/90 H-5 10,938' 10,946' 8' 4 Isolated
10/90 H-5 10,962' 10,970' 8' 4 Isolated
?BTD = 10,889' TD = 11,086'
MAX HOLE ANGLE = 27 deg.
SCU 33A-8 Act Draw.doc DRAWN BY: tcb REVISED: 8/20/98
Workover Summary
Soldotna Creek Unit, Well 33A-8
8/12/98 - 8/20/98
DAY 1 (8/12198)
RU SLICKLINE. TEST LUBRICATOR. RIH W/2.3" GAGE RING. TAG "XN" NIPPLE AT 10,795'.
POOH. RIH W/2-1/2 .... XN" PLUG. SET DOWN IN SLIDING SLEEVE AT 10,695' UNABLE TO
GET THROUGH. POOH W/O PLUG. RIH W/2-1/2" GS PULLING TOOL. LATCH AND
RETRIEVE PLUG. RIH W/2-1/2" PLUG AND SET IN "XN" AT 10,795'. RIH WITH EXTENDED
PRONG AND SET IN PLUG. PRESSURE TEST TO 1,500 PSI. GOOD TEST. POOH. RIH AND
SHIFT SLIDING SLEEVE AT 10,695'.
DAY 2 (8/13/98)
MIRU NORDIC RIG NO. 5. BLEED TUBING AND ANNULUS TO ZERO. WELL DEAD.
CIRCULATE 445 BBLS OF LEASE WATER TO DISPLACE TUBING AND ANNULUS. INSTALL
BPV.
DAY 3 (8114/98)
CONT. RIG UP. ACCEPT RIG AT 12:00 HRS. NIPPLE DOWN TREE. NIPPLE UP 7-1/16", 5M
BOPE.
DAY 4 (8/15/98)
CONT. NIPPLE UP. PULL BPV INSTALL TWO WAY CHECK. TEST BOP. WITNESS WAIVED
BY AOGCC. TEST 250/3,000 PSI. UNABLE TO GET TEST ON 3-1/2" RAMS. CHANGE SAME
AND RE-TEST 250/3,000 PSI. GOOD TEST. PULL TWO WAY CHECK. PULL ON TUBING
HANGER TO 92K. ROTATE TUBING TO RIGHT TO RELEASE E-22 ANCHOR FROM PACKER.
PULL HANGER TO FLOOR AND LAY DOWN SAME. BREAK CIRCULATION W/LEASE
WATER. POOH LAYING DOWN 3-1/2" X 2-7/8" COMPLETION.
DAY 5 (8/16/98)
CONT. POOH W/3-1/2" X 2-7/8" COMPLETION. FULL RECOVERY. CHANGE PIPE RAMS TO
2-7/8". TEST 250/3,000 PSI. GOOD TEST. PREP TO RUN NEW 2-7/8" GAS LIFT
COMPLETION. MU E-22 ANCHOR ASSEMBLY, 2-7/8" TUBING AND GAS LIFT MANDRELS AS
PER PROCEDURE AND RIH.
DAY 6 (8/17/98)
CONT. RIH WITH NEW 2-7/8" GAS LIFT COMPLETION. RUN TO TOP OF PACKER. RU E-
LINE TO RUN CCL CORRELATION LOG FOR SPACE OUT. UNABLE TO ACERTAIN
CORRELATION. PREMATURELY LATCH ANCHOR INTO PACKER. ATTEMPT TO ROTATE
OUT. NO-GO. PRESSURE TEST TUBING AND PACKER TO 500 PSI. FOR 15 MIN.. OK. RU
SLICKLINE TO RUN GAGE RING TO CONFIRM TUBING NOT OVER TOURQED. RU
SLICKLINE. RIH W/2.313" GAGE RING TO 10,790'. POOH. PRESSURE TEST TUBING AND
PACKER TO 1,500 PSI FOR 15 MIN. GOOD TEST. DRAIN BOP'S. DISCONNECT AND RAISE.
PULL 111K ON TUBING. INSTALL SLIP BOWL AND SLIPS ON TUBING SPOOL.
DAY 7 (8/18198)
BREAK OUT LANDING JOINT AND INSTALL HANGER. INSTALL LANDING JOINT. PU
TUBING AND REMOVE SLIPS AND BOWL. LAND HANGER IN TUBING SPOOL. SET DOWN
BOP'S AND NIPPLE DOWN. INSTALL SEAL FLANGE AND TREE. TEST TO 5,000 PSI.
GOOD TEST. REMOVE TWO WAY CHECK. COMMENCE RIG DOWN AND DE-MOB.
DAY 8 (8120198)
RU SLICKLINE. TEST LUBRICATOR, O-RING LEAKING. REPAIR SAME. PRESSURE TEST
TO 4,000 PSI. GOOD TEST. RIH W/1-5/8" JDC PULLING TOOL. LATCH AND PULL PRONG
AT 10,790'. GAIN 100 PSI ON TUBING. POOH. RIH WITH 2-1/2" GS PULLING TOOL. PULL
PLUG IN "XN" NIPPLE AT 10,790'. POOH. RD SLICKLINE. RETURN WELL TO PRODUCTION.
Unocal Corporation
P.O. Box 196247
Anchorage, Alaska gg51g
907-263-7660
UNOCAL )
Dan Williamson
Drilling Superint~nden{
August 14, 1998
Dear Mr. Wondzell,
Mr. Blair Wondzell
Alaska O&G Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501-1392
As per our conversation this morning, Unocal requests a variance for Soldotna
Creek Unit Well No, 33A-8, a Hemlock oil producer. The well has 9,375' of 3-1/2"
tubing and 1,375' of 2-7/8" which is slated to be pulled for replacement. The well
currently has a plug that is set in an 'XN' Nipple at 10,790' (Below a permanent
packer at 10,750') which will be left in.the hole to isolate the productive H-2 sand.
The well has been circulated to kill weight fluid and the plug tested to 1,500psi.
Unocal requests a variance allowing the use of an 11", 5M Double Gate dressed
with 3-1/2" and blind rams, utilizing the 11", 5M annular for pressure control
when pulling the 2-7/8".
If you should have any further questions regarding this request please contact
me at 263-7677. Thank you for your attention to this matter. ~_~
Sincerely,
Dan Williamson
Drilling Superintendent
L/l 'd 9090'ON 'd~JOO lVOONn V4dbt'~ 866L 'tb':~nv
Unocal North Americar~,,'
Oil & Gas Division ~
Unocal Corporation
P.O. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOCAL )
/\
Alaska Region
August 13, 1993
Mr. Russ Douglas
Commissioner
AOGCC
3301 Porcupine Dr.
Anchorage, Alaska 99504
Dear Russ:
This is to notify you that on July 19, 1993 well SCU 33A-8 in Swanson River Field was perforated in the
H2 sand from 10,86!' - 10,871' with Schlumberger Pivot Guns at four shots per foot and 180° phasing.
Ralph P. Holman
Engineer Technician
STATE OF ALASKA ·
ALASKA's': . AND GAS CONSERVATION CO~ SSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown __ Stimulate __ Plugging __ Perforate X_ ~.'~',~..}~
Pull tubing m Alter casingm Repair well __ Pull tubing __ Other__ G ,,,
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or I~i,'.':i.,.
Unocal Devek)pment _~ RKB: 1.54', GL: 128' ~"' .....
3. Address araagraphi~ __ 7. Unit or Property name \~'
P.O. Box 196247 Anchorage, Alaska 99519-6247 Serace Solclotna Creek Unit
4. Location of well at surface 8. Well number
1959' FNL, 1987' FEL, Sec. 8, T7N, R9W, SM SCU 33A-8
At top of productive interval 9. Permit number/approval number
2.5,33' FSL, 1655' FEL, Sec. 8, 'FTN, R9W, SM 72-0017-1
At effective depth 10. APl number
2427' FSL, 1587' FEL, Sec. 8, "I'TN, R9W, SM 50-133-20241-01
At total depth 11. Field/Pool
2430' FSL, 1563' FEL, Sec. 8, T7N, R9W, SM Swanson River/Hemlock
12. Present well condition summary
Total depth: measured 11178 feet Plugs (measured)
true vertical 10935 feet
Effective depth: measured 10889 feet Junk (measured)
true vertical 10670 feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
Conductor 58' 18" D riven 58' 58"
Surface 3332' 10-3/4" 2218 cu. ft. lead 3332' 3332'
Intermediate
Production 9993' 7-5/8" 743 sx class G 9993' 9864'
Liner 1547' 5-1/2" 74 bbls. class G 9631'-11178' 9631'-10935'
Perforation depth: measured 10861'-10871'
true vertical 10645'-10654'
Tubing (size, grade, and measured depth) 3-1/2" (iD 9375' & 2-7/8" from 9375'-10805'
Packers and SSSV (type and measured depth) Baker model F-1 @ 10762' ~ ~ C F ~V ~ ~
13. Stimulation or comont squoeze summary
Intervals treated (measured) N0¥ "3 199;
.~Jaska 0ii & ¢~as Cons, C0mmissi0~
Treatment description Including volumes used and final pressure Anchorage
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 201 10781 6 1400 1300
Subsequent to operation 302 17391 3 1650 1500
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations ~ Oil X_ Gas ~ Suspended __ Service
17. I her~,I.ce/~,~ng is true and correct to the best of my knowledge.
Signed~"~~~~J, Title~[tL~l./~ [~~q~"'~ Date ~q,O~"[, Cj~
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
~51 AI I-- L)i- ALA~SKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLIC ' ON FOR SUNDRY AP(' 1OVALS
1. Type of request: Abandon __ Suspend __ Operations shutdown __ Re-enter suspended well__
Alter caslng__ Repair well __ Plugging __ Time extension __ Stimulate __
Change approved program __ Pull tubing __ Variance __ Perforate X_ Other__
2. Name of Operator
Union Oil Company of Califomla (Unocal)
3. Address
P.O. Box 196247 Anchorage, Alaska 99619-6247
4. Location of well at surface
1959' FNL, 1987' FEL, Sec. 8, T7N, R9W, SB&M
At top of productive inten/al
25,33' FSL, 1655' FEL, Sec. 8, 'lTN, R9W, SB&M
At effective depth
2427' FSL, 1587' FEL, Sec. 8, T7N, R9W, SB&M
At tolal depth
2430' FSL, 1563' FEL, Sec. 8, T7N, R9W, SB&M
J5. Type of Well:
6. Datum elevation (DF or KB)
RKB: 154', GL: 128'
7. Unit or Property name
$oldotna Creek Unit
8. Well number
SCU 33A-8
9. Permit number
~ ?.z-~l~-I ~,¢~.
10. APl number
50-133 -20241-1
11. Field/Pool
Swanson River/Hemlock
feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11178
10935
10889
1 O670
feet
feet
feet
feet
Plugs (measured)
Junk (measured)
10889 - 10910
ORI61NAL
Casing
Structural
Conductor
Surface
Intermediate
Production
Uner
Perforation depth: measured
Length Size
58' 18"
3332' 10-3/4"
9993' 7-5/8"
1547' 5-1/2"
10864'- 10870' (H2)
true vertical
10848'- 10653' (H2)
Tubing (size, grade, and measured depth)
3-1/Z' @ 9375' & 2-7/8' from 9375'-10805'
Packers and SSSV (type and measured depth)
Baker model F- 1 @ 10762'
Cemented
Measured depth
Driven 58'
2218 cu. ft. lead 3332'
& 15o sx class ~
743 sx class G
74 bbls. class G
True vertical depth
8
9993' 9864'
9631'-11178' 9631'-10935'
RE.EEIVED
JUN 2 8 199
Alaska Oil & Gas Cons. Commissio~t
Anchorage
13. Attachments
Description summary of proposal __ Delailed operations programX__
BOP sketch
14. Estimated date for commencing operation
July 6, 1993
16. If proposal was verbally approved
Name of approver
I 5. Status of well classification as:
Oil X_ Gas __
Date approved Service
Suspended
17. I herel~(/'~gertify/ljhat th~fg(ego, ing~s tru_e.,a0d correct to the best of my knowledge.
· FOR COMMISSION USE ONLY
Conditions of approval: NoUfy Commission so representaUve may witness
Plug Integrity _ BOP Test Location clearance
Mechanical Integrity Test_ Subsequent form required 10-
Approved by the order of the Commission
ORIGINAL SIGNED
RUSSELL A. DOUGLASS
q,o .../
I Approval No.
..'~,pprove. d Copy / /
Returned
Commissioner Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
June 24, 1993
Swanson River Well SCU 33A-8 Perforating Procedure
1. Obtain a well test.
.
Shoot a fluid level in tubing to verify liquid level is several hundred feet above
perforated interval. Load tubing with crude if necessary.
3. Hold safety meeting with appropriate personnel.
4. Rig up electric line unit. (A pump-in sub is required on lubricator)
5. Pressure test lubricator to 3500 psi for five minutes.
6. Shut down all welding and radio transmissions.
,
RIH and perforate intervals as instructed by Unocal representative. (When gun is
200' below surface, welding and radio transmissions may resume.)
,
POOH. (When gun is 200' below surface, shut down all welding and radio
transmissions.)
9. Repeat steps 5,6 and 7 as needed to perforate the following intervals:
BENCH MEASURED TVD FEET
H2 10836-10854 10624-10639 18
H2 10862-10870 10645-10652 8
TOTAL 26
Alaska 0il & ~as Cons. Commission,
'Anchorage
Unocal North America:
Oil & Gas Division
Unocal Corporation
909 West 9th Ave., P.O. Box 190247
Anchorage, Alaska 99519-0247
Telephone (907) 276-7600
UNOCAL
Alaska Region
DOCUMENT TRANSMITYAL
January 22, 1993
TO: Larry Grant FROM:
3001 Porcupine Drive
Anchorage AK 99501
ALASKA OIL & GAS
CONSERVATION COMMISSION
Ralph Holman
P O Box 196247
Anchorage AK 99519-6247
ALASKA REGION
Transmitting as Follows:
Swanson River Unit
1 - Sub-Surface Directional Survey- SCU 33A-8 7 ~"]7"q
Kenai Gas Field- KU14-4
2 - Temperature Log Gamma Ray
1 - Spectral Analysis
PLEASE ACKNOWLEDGE RECEIPT OF THIS DOCUMENT TRANSMITTAL BY
SIGNING AND RETURNING ONE CQPY. THANK YOU.
DATED: / , ..... , ,._
,.
GREAT LAND DIRECTIONAL DRILLING, INC.
REPORT OF SUB-SURFACE DIRECTIONAL SURVEY
ARCO ALASKA, INC.
COMPANY
8CU 33A-8
WELL NAME. .. ....
SWANSON RIVER UNIT, KENAI, ALASKA
eeMemmmmmemmmem~mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
~OCATION
AL1090D35 GYRO/MWD
io/2i/9o
JOB NUMBER TYPE SURVEY DATE
TITLE SIGNATURE
DEPTH INTERVAL FROM TO
to/oz/9o
DATE SURVEY TAKEN FROM TO
THIS IS A RECORD OF A.SUB-SURFACE SUI~VEY OF YOUR WELL WE
HAVE RETAINED A COPY OP YOUR ~UI~VE¥ REPORT IN OUR FILES
FOR YOUR CONVENIF/qCE~ HOWEVER, SHOULD YOU SO DESIRE, ALL
COPIES OF THE SURVEY REPORT WILL BE FORW~RDED TO YOU ON
b~~ WRITTEN REQUEST, ALL SURVEYS ARE KEPT IN A LOCKBD FILE
AND ARE HELD IN STRICTEST CONFIDENCE.
~;~'". ':.~, ~
· -tF
GREAT LAND DIRECTIONAL DRILLING, INC.
Client .... : ARCO ALASKA, INC.
Field ..... : SWANSON RIVER UNIT
Well ...... : SCU 33A-8
8ection at: S,27.01,E
Engineer..: TOM DUNN
Computation...: RADIUS OF CURVATURE
Survey Date...: 10/21/90
RKB Elevation.: 154.00 ft
Reference ..... : AIA090D35
~agnetic Dcln.: 24.00 E
MEAS INCLN VERTICAL-DEPTHS SECTION DIRECTION RELATIVE-COORDINATES CLOSURE DL
DEPTH ANGLE BKB SUB-SEA DI STNCE BEARING FROM-WELL-HEAD DISTNCE BEARING /100
0 0.00 0.0 -154.0 0.0 N 0.00 E 0.0 N ~' 0.0 E 0.0 N 90.00 E 0.00
100 0.28 100.0 -54.0 -0.2 S 89.50 W 0.2 N 0.2 W 0.2 N 45.25 W 0.28
200 0.25 200.0 46.0 -0.4 ~ 77.50 W 0.1 N 0.6 r~ 0,6 N 80.54 W 0.03
300 0.25 300.0 146.0 -0.5 S 81.60 W 0.0 N 1.0 W 1.0 N 88.72 ~ 0.00
400 0.17 400.0 246.0 -0.7 N 78.00 W 0.0 N 1.4 W 1.4 N 88,59 W 0.08
7 500 0.67 500.0 346.0 -1.3 N 42.20 W 0.4 N
7 600 0.32 600.0 446.0 -2.! N 16.70 W 1.1 N
7 700 0.43 700.0 546.0 -2,6 N 40.90 E 1.8 N
7 800 0.70 800.0 646.0 -3,0 N 36.60 E 2.5 N
7 900 0.62 900.0 746.0 -3.7 N 17.20 E 3.5 N
7 1000 0.77 1000.0 846.0
7 2100 0.88 1100.0 946.0
7 1200 0,73 1199.9 1045.9
7 1300 0.93 1299.9 1145.9
7 1400 0.73 1399.9 1245.9
7 1500 0.77 1499.9 ~345.9
7 1600 0.65 1599.9 1445.9
7 1700 0.45 1699,9 1545.9
7 1800 0.60 1799,9 1645.9
7 1900 0.58 1899.9 1745.9
-4.5 N 26.70
-5.6 N 3.80
-6.8 N 15.60
-7.9 N 3.00
-9.2 N 4.70
-10.4 N 11.50
-11.5 N 25.70
-12.5 N 41.10
-13.2 N 85.60
-13.9 N 67.10
4.7N
6..1N
7.5N
8.9 N
10.3 N
11.6 N
12.8 N
13.6 N
14.0 N
14.3 N
2.0 W
2.5 W
2.3W
1.7W
1.2 W
0.7 W
0.5 'W
0.3#
0.1W
0.1W
0.0 W
0.2W
0.TV
1.5 W
2.5W
2.1 N 79.03 W 0.50
2.7 N 65.08 W 0.35
2.9 N 52.95 W 0.11
3.0 N 34.07 Iir 0.27
3.7 N 18.52 W 0.08
4.7 N 8.94 W 0.15
6.1 N 4.26 W 0.11
7.5 N 2.37 W 0.15
8.9 N 0.48 W 0.20
10.3 N 0.53 W 0.20
11.6 N 0.09 W 0.04
12.8 N 0.76 W 0.1Z
13.7 N 2.92 W 0.20
14.1 N 6.08 W 0.15
14.5 N 9.89 W 0.02
2000 0.33 1999.9 1845.9 -14.4 N 74.30
14.5 N
3'.2 W
14.9 N 12.56 W 0.25
m
i
i
~D
C
C
'Survey Codes: ?/GYRO
SCU 33A-8 Page 2 10/22/90
RECORD OF SURVEY
S MEAS INCLN VERTICAL-DEPTHS SECTION DIRECTION RELATIVE-COORDINATES CLOSUI~E DL
C DEPTH ANGLE BKB ~UB-SEA DISTNCE BEARING FROM-WELL-HEAD DI STNCE BEARING /100
7 2100 0.35 2099.9 1945.9 -14.8 N 86.10 W 14.6 N 3.8 W 15.1 N 14.63 W 0.02
7 2200 0.35 2199.9 2045.9 -15.2 N 73.70 91 14.8 N 4.4 W 15.4 N 16.69 W 0.00
-'~'~ 7 2300 0.42 2299.9 2145.9 -15.7 N 56.50 W 15.0 N 5.0 W 15.9 N 18.50 W 0.07
7 2400 0.33 2399.9 2245.9 -16,3 N 47.40 W 15.4 N 5.5 W 16.4 N 19.76 1; 0.09
7 2500 0.37 2499.9 2345.9 -16.8 N 57.60 91 15.8 N 6.0 W 16.9 N 20.88 W 0.04
7 2600 0.25 2599.9 2445.9 -17.3 N 65.40 91 16.1 N
7 2700 0.47 2699.9 2545.9 -17.7 N 88.50 91 16.2 N
7 2800 0.62 2799.9 2645.9 -18.3 N 68.70 W 16.4 N
7 2900 0.30 2899.9 2745.9 -18,9 I 58.70 W 16.7 N
7 3000 0.12 2999.9 2845.9 -19.0 S 53.10 W 16.7 N
6.5W
7.1 91
8.0W
8.8W
9.1 W
17.3 N 22.04 W 0.12
17.7 N 23.70 If O.22
18.3 N 26.13 W 0.15
18.9 N 27.61
19.0 N 28.55 I~ 0.18
IT1
I
I
~c~
c
z
c
7 3100 0.10 3099.9 2945.9 -19.0 S 72.90 W 16.6 N
7 3200 0.05 3199.9 3045.9 -19.1 N 74.10 W 16.6 N
7 3300 0.12 3299.9 3145.9 -19.2 N 30.20 W 16.7 N
7 3400 0.12 3399.9 3245.9 -19.4 N 64.90 W 16.9 N
7 3500 0.05 3499.9 3345.9 -19.4 ~ 54.60 E 16.8 N
7
7
7
7
3600 0.33 3599.9 3445.9 -19.2 N 65.00 E 16.8 N
3700 0.40 3699.9 3545.9 -19.3 N 45.30 E 17.1 N
3800 0.37 3799.9 3645.9 -19.4 N 61.10 E 17.5 N
3900 0.57 3899.9 3745.9 -19.6 N 37.90 ~ 18.0 N
4000 0.32 3999.9 3845.9 -20.1 N 13.50 E 18.7 N
9.3I;
9.4 W
9,5 1;
9.71;
9.7 W
9.4W
8.91;
8.31;
7.7 I;
7.4W
19.1 N 29.13 W 0.02
19.3. N 29.47 If 0.05
19.2 N 29.63 If 0.07
19.4 N 29.82 W 0.00
19.4 N 30.08 W 0.07
19.2 N 29.31 W 0.28
19.3 N 27.43 W 0.07
19.4 N 25.48 W 0.03
19.6 N 23.18 ~/ 0.Z0
Z0.1 ti 21.53 W 0.25
z
4100 0.80 4099.9 3945.9 -20.8 N 12.80 E 19.7 N
4200 1.00 4199.8 4045.8 -22.2 N 12.10 W 21.3 N
4300 0.97 4299.8 4145.8 -23.9 N 21.40 W. 22.9 N
4400 0.97 4399.8 4245.8 -25.5 N 2.10 W 24.5 N
4500 1.32 4499.8 4345.8 -27.3 N 0.30 W 26.5 N
4600 1.18 4599.8 4445.8 -29.3 N 7.90 W 28.7 N
7.2W
7.2~r
7.7W
8.0If
8,2W
21.0 N 20.01 1; 0.48
22.4 N 18.63 Ii' 0.20
24.1 N 18.49 1; 0.03
25.8 N 18.05 W 0.01
27.7 N 16.66 1; 0.35
29.9 N 15.93 I/ 0.14
Survey Codes: 7/GYRO
SCU 33A-8 Page 3 10/22/90
R~ORD O~ ~.FR~'~
S HEAS INCLN VERTICAL-DEPTHS SECTION DIRECTION Rk~r.ZkTIVE-COORDINATES CLOSURE DL
C DEPTH ANGLE BKB SUB-SEA DISTNCE BEARING FROH-WELL-ttEAD D!STNCE BEARING !100
7 4700 0.92 4699.8 4545.8 -31.0 N 2.g0 E 30.5 N 8.3 ~ 31.6 N 15.16 W 0.26
7 4800 1.07 4799.7 4645.7 -32.5 N 2.60 E 32.3 N 8.2 W 33.3 N 14.24 W 0.15
7 4900 1.10 4899.7 4745.7 -34.1 N 1.90 E 34.2 N 8.1 I~ 35.1 N 13.37 W 0.03
7 5000 1.15 4999.7 4845.7 -35.9 N 3.60 W 36.1 N 8.2 W 37.0 N 12.71 W 0.05
7 5100 1.13 5099.7 4945.7 -37.7 N 1.50 W 38.1 N 8.2 W 39.0 N 12.19 I~ 0.02
7 5200 1,42 5199,7 5045,7 -39,7 N 5,10 E 40,3 N
7 5300 1,67 5299,6 5145,6 -41,9 N 8,50 E 43,0 N
7 5400 1,80 5399,6 5245,6 -44,3 N 9,60 E 46,0 N
7 5500 1.93 5499,5 5345.5 -47,0 N 9,70 E 49.2 N
7 5600 1,97 5599,5 5445,5 -49,6 N 12,90 E 52,6 N
8.2 W
7.8 W
7.4 W
6.8W
6.2 W
41.2 N 11.45 W 0.29
43.7 N 10.34 W 0.25
46.6 N 9.10 W 0.13
49.7 N 7.90 W 0.13
52.9 N 6.69 I~ 0.04
7 5700 2,22 5699,4 5545,4 -52,4 N 12,00 E 56,1
7 5800 2,55 5799,3 5645,3 -55,5 N 18,50 E 60,1
7 5900 2,92 5899,2 5745,2 -58,8 N 19,50 E 64,7
7 6000 3,42 5999,0 5845,O -62,7 N 17,30 E 69,9
7 6100 3.33 6098.9 5944.9 -66.7 N 22.30 E 75.4
5.4 W
4.3 W
2.7 W
1.0 W
1.0 g
56.4 N 5.47 W 0.25
60.3 N 4.07 W 0.33
64.7 N Z.41 W 0.37
69.9 N 0.80 W 0.50
75,4 N 0.77 E 0.09
7 6200 2.93 6198.7 6044.7
7 6300 2.70 6298.6 6144.6
7 6400 2.78 6398.5 6244.5'
7 6500 2.92 6498.4 6344.4
7 6600 3.08 6598,2 6444,2
-70.3 N 21.80 E
-73.5 N 24.70 E
-76.5 E 23.O0 E
-79.6 N 25.40 E
-82.8 N 24.80 E
80.5 N
85.0 N
89.4 N r~
93'9 N
98'7 N
3.1
5.0
6.9
9.0
11'2
80,6 N 2.18 E 0.40
85.2 N 3.37 E 0.23
89.6 N 4.44 E 0.08
94.3 N 5.46 E 0.14
99,3 N 6.47 E 0.16
7 6700 2.95 6698.1 6544.1 -86.2 N 20.30 E 103.5 N 13.Z
7 6600 3.07 6797.9 6643.9 -89.7 'N 22.40 E 108.4 N 15.1
7 6900 3,27 6897,8 6743,8 -93,3 N 22,10 E.. 113,5 N 17,2
7 7000 3.20 6997.6 6843.6 -97.0 N 22.70 E 118.7 N 19,4
7 7100 3.22 7097.5 6943.5 -100.7 N 19.20 E 124.0 N 21.4
104,4 N 7.27 E 0.13
109.5 N 7.94 E 0.12
114.8 N 8.62 E 0.20
120,3 N 9.26 E 0.07
125,8 N 9.78 E 0.02
7 7200 3,17 7197,3 7043,3 -104,5 N 21,80 E 129,2 N ~' 23,3 E 131,3 N 10,23 E 0,05
I
I
x1
c
z
c
Survey Codes: 7~GYRO
SCU 331-8 Page 4 10/22/90
RECORD OF SURVEY
S MEAS INCLN VERTICAL-DEPTHS SECTION DIRECTION RELATIVE-COORDINATES CLOSURE DL
C DEPTH ANGLE BKB SUB-SEA DISTNCE BEARING FROM-WELL-HEAD DISTNCE BEARING /100
7 7300 3.27 7297.2 7143.Z -108.2 N 21.70 E 134.4 N 25.4 E 136.8 N 10.70 E 0.10
7 7400 3.28 7397.0 7243.0 -112.O N 19.90 E 139.7 N 27.4 E 142.4 N 11.10 E 0.01
~7 7500 3.97 7496.8 7342.8 -116.1 N 26.30 E 145.6 N 29.9 E 148.6 N 11.61 E 0.69
7 7600 5.57 7596.4 7442.4 -120.3 N 39.10 E 152.5 N 34.4 E 156.4 N 12.71 E 1.60
7 7700 6.76 7695.9 7541.9 -120,5 N 84.50 E 157.5 N 43.6 E 163,4 N 15.48 E 1.37
7 7750 7.60 '7745.5 7591.5 -117.8 S 86.60 E 157.6 N 49.9
7 7800 7.75 7795.0 7641.0 -113.8 S 75.30 E 156.6 N 56.5
7 7900 8.03 7894.1 7740.1 -102.4 f; 42.80 E 149.6 N 68.1
7 7950 7.02 7943.6 7789.6 -95.9 8 31.70 E 144.4 N 72.0
7 8000 6.40 7993.3 7839.3 -90.1 S 20.20 E 139.1 N 74.6
7 8100 5.72 8092.7 7938.7 -79.6 S 24.60 E 129.4 N 78.6
7 8200 7.22 8192.1 8038.1 -68.5 S 47.70 1; 120.3 N 85.2
7 8300 9.13 8291.1 8117.1 -56.2 S 65.60 E 112.6 N 97.0
7 8400 10.42 8389.6 8235,6 -42.3 S 57.80 E 104.5 I 112.O
7 8450 10.68 8438.8 8284.8 -33.8 S 41.50 E 98.6 N 118.9
165.3 N 17.56 E 1.67
166.4 N 19.83 E 0.51
164.4 N 24.47 E 0.69
161.4 N 26.51 E 2.05
157.9 N 28.19 E 1.27
151.4 N 31.28 E 0.68
147.5 N 35.30 E 1.54
148.6 N 40.76 E 1.96
153,2 N 46.97 E 1.31
154.5 N 50.34 E 1.23
7
7
7
7
8500 10.97 8487.9 8333.9
8550 12.90 8536.8 8382.8
8600 14.58 8585.4 8431.4
8650 15.97 8633.6 8479.6
8700 16.80 8681.6 8527.6
-24.5 S 23.80
-14.3 S 14.40
-2.8 S 10.80
9.8 S 10.80
23.3 S 9.00
90.7 N 124.0
81.0 N 127.4
69.4 N 129.9
56.5 N ,., 132,4
42.6 N 134.8
153.6 N 53.80 E 1.41
150,9 N 57.55 E 3.97
147.3 N 61.90 E 3.39
143.9 N 66.91 E 2.78
141,4 N 72.48 E 1.69
7 8800 18.57 8776.9 8622.9
7 8900 20.07 8871 · 2 8717.2
7 9000 22.20 8964 · 5 8810 · 5
7 9100 24.50 9056 . 3 8902.3
7 9200 24.75 9147 . 2 8993 . 2
51.6 S 2.00 iii
80.8 S 3.60 W
111.2 S 7.30 W.
143.0 til12.10 W
177.4 S 2.50 W
12.3 N 137.7
20.7 S 137~3
56.6 S 133.9
95.7 S 127.2
137.0 S 121.9
138,3 N 84.88 E 1.91
138.8 S 81.41 E 1.64
145.3 S 67.07 E 2.19
159.1 S 53,05 E 2.44
183.3 il 41.67 E 1.70
7 9300 25.57 9237.7
'Survey Codes: 7/GYRO
9083.7
215.6. S 4.70 E
179.4 S 12Z.7 E
217.4 S 34.37 E 1.57
c
c~
z
c
Z
SCD' 33A-8 Page 5 20/Z2/90
RB¢ORD OF ilU1WEg
S: MEAS INCLN VERTICAL-DEPTHS SECTION DIRECTION RELATIVE-COORDINATEIl CLOSURR DL
C DEPTH ANGLE BKB SUB-IlEA Dr STNCE BEARING FROM-NELL-HEAD DISTNCE BEARING / 100
7 9400 25.57 9327.9 9173.9 255.5 S 4.70 E 222.4 il 126.2 E 255.8 S 29.58 E 0.00
7 9500 25.47 9418.2 9264.2 295.2 S 3.50 E 265.4 8 129.3 E 295.2 il 25.98 E 0.24
~-~ 7 9600 24.67 9508.7 9354.7 334.1 8 3.70 E 307.7 8 132.0 E 334.8 il 23.22 E 0.80
7 9700 24.82 9599.6 9445.6 372.4 S 3.10 E 349.5 il " 134.5 E 374.5 S 21.05 E 0.18
7 9800 24.32 9690.5 9536.5 410.2 S 1.40 E 391.0 S ! 136.1 E 414.0 fl 19.19 g 0.58
7 9900 25.67 9781,! 9627.1 448.0 S 0.40 W 433.3 il 136.5 E 454.3 8 17.48 E 1.39
ABOVE SURVEYS ARE FRON GYRO SURVEY OF 08/21/90.
7 9977 26.75
3 10056 27.10
3 10087 27.30
3 10125 27.30
9850,2 9696.2
9920.6 9766.6
9948.2 9794.2
9982.0 9828.0
479.1 il 6.94 E
513.9 S 21.20 E
528.0 S 25.80 E
545.5 S 28.30 E
467,2 S 138,4 E
501,8 il 147,1 E
514,8 S 152,7 E
530,3 S r. 160,7 E
487.3 il 16.50 E 2.39
522.9 B 16.34 E 3.77
537.0 S 16.52 Ii: 3.19
554.1 S 16.85 E 1.38
10251
10345
10409
10535
10630
3 10713
i 11007
I 11120
26.20 10094.5 9940.5
26.10 10178.9 10024.9
26.10 10236.4 10082.4
25.50 10349.8 10195.8
25.00 10435,7 10281.7
25.00 10510.9 10356.9
25.00 10777.4 10623.4
22.00 10881.0 10727.0
602.1 S 31,50 E
643,4 S 30.80 E
671.5 8 31.00 E
726.2 S 31.60 E
766,5 il 33.00 E
801.4 S 34.70 E
923.3 S 41.00 E
967.0 il 41.00 E
579.5 S 188.9 E
614.9 S 210.4 E
639.'1S 224.8 E
686.0 S 253.3 g
720.2 S 275.0 E
749.3 S 294.5 E
847.4 S 370.7 E
881.4 S ; 400.3 g
609,5 S 18,06 E 1,00
649,9 E 18,88 E 0.18
677,5 il 19,38 E 0,06
731.2 E 20.27 E 0.48
770.9 8 20.90 E 0.59
805.1 S 21.45 E 0.37
924.9 S 23.63 E 0.38
968.0 S 24.42 E 2.65
PROJECTED T, D, IT 11178 HD,
11178 21,50 10934,9 10780,9
987.9 S 41,50 E
897,6 S
414.4 E
988.6 8 24.78 g 0.87
'Survey Codes: 1/IlINGLE SHOT 3/HWD 7/GYRO
SCU 33A-8 Page 6 10/22/90
DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL
SUBS~A I~,AS INCLN ~ HD-TVD VERT DIRECTION R~TATIVE COORDINATES
DEPTH DEPTH ANGLE BKB DIFF CRRT BEARING
--100 54 0.15 54 0 0 S .89.50 T6
O 154 0.26 154 O 0 S 83.02 W
100 254 0.25 254 0 0 S 79,71 W
200 354 0.21 354 0 0 N 87.38 W
300 454 0.44 454 0 0 N 58.67 '6
FROM WELL HEAD
0.05 N 0.05
0.14 N 0.41
0.06 N O. 85
0.01 N 1.26
0.14 N t, 1.67
400 554 0.48 554 0 0 N 28.43
500 654 0.38 654 0 0 N 14.41
600 754 0.58 754 O 0 N 38.58
700 854 0.66 854 0 0 N 26.12
800 954 0.70 954 0 0 N 22.33
0.84 N 2.35
1.47 N 2.46
2.12 N 2.02
3.07 N 1.37
4.13 N 0,98
900 1054 0.83 1054 0 0 N 10.22 E
1000 1154 0.80 1154 0 0 N 6.69 E
1100 1254 0.84 1254 0 0 N 8.79 E
1200 1354 0.82 1354 0 0 N 1.16 W
1300 1454 0.75 1454 0 0 N 4.06 E
5.38 N
6.85 N
8.18 N
9.71N
11.03 N
0.50
0.43
0.15
0.06
0.10
1400 1554 0.71 1554 0 0 N 8.62
1500 1654 0.54 1654 0 0 N 34.03
1600 1754 0.53 1754 0 0 N 65.17
1700 1854 0.59 1854 0 0 N 75.59
1800 1954 0,44 1954 0 0 II 71.00
1900 2054 0.34 2054 0 0 II 80.68
2000 2154 0.35 2154 0 0 II 79.39
2100 2254 0.39 2254 0 O N 64.39
2200 2354 0.37 2354 0 0 II 51.58
2300 2454 0.35 2454 0 0 II 52.92
2400 2554 0.31 2554 0 0 II 61.82 W
12 · 32
13.33
13.91
14.13
14 · 45
14,61
14 · 69'
14,87
15.25
15.64
15.97
0.00
0.45
1.06
2.05
2.94
3.55
4.15
4.75
5.33
5.79
6.31 W
'7'
CD
SCU 33A-8 Page 7 10/22/90
DATA INTERPOLAT~ FOR 100 FT SUBSEA INTR~VAL
SUBSEA MEAS INCLN TVD HD-TVD VERT DIRECTION RELATIVE COORDINATES
DEPTH DEPTH ANGLE BKB DIFF CRRT BEARING FROM NELL HEAD
2500 2654 O. 37 2654 0 0 lq 77.90 lq' 16.16 N 6.78
2600 2754 0,55 2754 0 0 N 77.78 W 16,26 N 7.59
2700 2854 0.45 2854 0 0 N 63.29 W 16.60 N 8.50
2800 2954 0.20 2954 0 0 S 84.38 W 16.80 N 8.99
2900 3054 0,11 3054 0 0 S 63.82 W 16.67 N 9,20
3000 3154 0.07 3154 0 0 N 89.24 W 16.63
3100 3254 0.09 3254 0 0 N 50.34 W 16.67
3200 3354 O'12 3354 0 0 N 48.98 W 16,82
3300 3454 0,08 3454 0 0 8 23.24 W 16.84
3400 3554 0.20 3554 0 0 S 72.43 E 16.73
9,36
9.46
9.59
9.75
9.61
3500 3654 0.37 3654 0 0 N 54.34
3600 3754 0.38 3754 0 0 N 53.85
3700 3854 0'.48 3854 0 0 N 48.54
3800 3954 0.43 3954 0 0 N 24.69
3900 4054 0.58 4054 0 0 N 13.12
16.92 N
17.36 It*
17.75 N
18.45 N !.
19.16 lq
9.12
8.60
8.02
7,48
7.30
4000 4154 O.91 4154 0 0 N 0.68
4100 4254 0.98 4254 0 0 N 17.14
4200 4354 0.97 4354 0 0 N 10.94
4300 4454 1.16 4454 0 0 lq 1.12
4400 4554 1.24 4554 0 0 N 4.42
4500 4654 1.04 4654 0 0 N 2.04
4600 4754 1.00 4754 0 0 N 2.74
4700 4854 1.09 4854 0 0 N 2.22
4800 4954 1.13 4954 0 0 N 1.09
4900 5054 1.14 5054 0 0 N 2.46
20.50 N
22.16 N
23.78 N
25.55 N
27.76 N
29.76 N
31.46 N
33.30 lq
35.23
37. ZZ lq
7.09
7.40
7.91
8.03
8.09
8.29
8.23
8.15
8.11
8.21
5000 5154 1.29 5154 0 0 N 2.09
39.27 N
8.23
-t
IT1
O
I
I
c
c.
c
SCU 33A-8 Page 8 10/22/90
DATA IIfI'~L~TED FOR 100 FT SUBSEA INTERVAL
SUBSEA ltEAS INCL}I TVD HD-TVD VERT DIRECTION RELATIVE COORDINATES
DEPTH DEPTH AI~GLE BKB DIFF CRRT BEARING FROM WELL HEAD
5100 5254 1.56 5254 0 0 N 6.95 E 41.75 N 8.02
5200 5354 1.74 5354 0 0 N 9.10 E 44.62 N 7.60
5300 5454 1,87 5454 0 0 N 9.65 R 47.73 N 7.08
5400 5555 1.95 5554 1 0 N 11.44 E 51.04 N 6.49
5500 5655 2.11 5654 1 0 N 12.41 E 54.45 N 5.74
5600 5755 2.40 5754 I 0 N 15.55 E 58.27 N
5700 5855 2.75 5854 I 0 N 19.05 E 62.54 N
5800 5955 3.19 5954 I 0 N 18.29 E 67.42 N
5900 6055 3.37 6054 I 0 N 20.05 E 72.99 N
6000 6155 3.11 6154 I 0 N 22.02 E 78.31N
4.85 W
3.46 W
1.78 W
0.06 E
2.18 E
6100 6255 2.80 6254 1 0 N 23.41 E 83.05 N
6200 6355 2.74 6354 1 0 N 23.76 E 87.41 N
6300 6456 2.86 6454 2 0 N 24.33 E 91.88 N
6400 6556 3.01 6554 2 0 N 25.07 E 96.52 N
6500 6656 3.01 6654 2 0 N 22.29 E 101.37 N
4.13 E
6.08 E
8.03 E
10.20 E
12.38 E
6600 6756 3.02 6754 2 0 N 21.48
6700 6856 3.18 6854 2 0 N 22.23
6800 6956 3.23 6954 2 0 N 22.44
6900 7056 3.21 7054 2 0 N 20.72
7000 7157 3.19 7154 3 0 N 20.67
106.23 N <:
111.23 N
116.47 N
121.67 N
126.94 N
14.25
16.28
18 · 42
20.53
22.45
7100 7257 3.23 7254 3 0 N 21.74 E
7200 7357 3.28 7354 3 0 N 20.68 E
7300 . 7457 3.67 7454 3 0 N 23.55 E _
7400 7557 4.89 7554 3 0 N 33.64 E
7500 7658 6.27 7654 4 0 N 65.37 E
7600 7759 7.63 7754 5 i S 84.66 E
132.13 N
137.44 N
142.96 N ·
149.39 N ~
156.16 N :
157.52 N
24.49
26.58
28.71
32.12
39.07
51.01 E
m
I
c
.--t
ITl
I--
'7
O
SCU 33A-8 Page 9 10/22/90
DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL
SUBSEA MEAS INCLN T%'D HD-T~D VERT DIRECTION RELATIVE COORDINATES
DEPTH DEPTH ANGLE BKB DzFF CRRT BEARING FROM WELL, HEAD
7700 7860 7.9?. 7854 6 I B 55.95 E i53.22 N 63.81
7800 7960 6.89 7954 6 1 S 29.30 E 143.30 N 72.67
7900 8061 5.98 8054 7 1 S 22.89 E 133.02 N 77.00
8000 8162 6.64 -8154 8 i S 38.83 E 123.75 N 82.08
8100 8262 8.41 8254 8 i B 58.88 E 115.28 N 92.01
8200 8364 9.95 8354 10 1 S 60.62
8300 8465 10.77 8454 11 2 S 36.02
8400 8568 13.49 8554 14 2 S 13.13
8500 8671 16.32 8654 17 4 $ 10.04
8600 8776 18.14 8754 22 5 S 3.69
107.78 N 106.47
96.37 N 120.73
77 . 06 N 128 . 31
50.65 N 133.48
19.91 N . i37.35
8700 8882 19.80 8854 28
8800 8989 21.96 8954 35
8900 9097 24.44 9054 43
9000 9207 24.81 9154 53
9100 9318 25.57 9254 64
6 S 2.57
7 8 6.88
9 B 11.98
10 ~ 1.96
11 S 4.70
14.49
52.39
94.65
140.0,9
187.20
137 · 61
134.38
127.40
121.77
123.35
9200 9429 25.54 9354 75
9300 9540 25.15 9454 86
9400 9650 24 · 74 9554 96
9500 9760 24 · 52 9654 106
9600 9870 25.26 9754 116
9700 9981
9800 10094
9900 10206
10000 10317
10100 104Z9
lOZO0 10540
26.77 9854 127
27.30 9954 ! 40
26.59 10054 152
26.13 10154 163
26.01 10254 175
25.48 10354 186
.11 S 4.35 E
11 ~ 3.58 E
10 Iii 3.40 E
10 Ii; 2.08 R
I0 Ii; 0.14 E
11 S 7.71
12 S 26.23
12 8 30.35
12 S 31.01
11 S 31.09
11 S 31.67 E
234.88
282.34
328.49
374.47
420.36
469.11
517.50
562.25
604.48
646.50
687.67 S
127.23
130.38
133.28
135.60
136.50
138.65
154.04
178.59
204 · 09
229.26
254.36 E
IT1
0
I
I
C
n
z
c
z
c
SCU 33A-8 Page .10 10/22/90
DATA IXTERPOLAT~D FOR 100 FT SUBSSA INTSRVA~
SUBSEA NKAS INCLN TVD ND-TVD VERT DIRECTION RELATIVE COORDINATES
DEPTH DEPTH ANGLE BKB DIFF CRRT BEARING FROH FEI3h'HEAD
10300 10650 25.00 10454
10400 10761 25.00 10554
~" 10500 10871 25.00 10654
11091 22.78 10854
196 11 $ ~3.41 E 727.35 S 279.63
207 10 S 35.72 E 765.75 S ' 306,07
217 10 S 38.08 B 803.04 $ 334.07
227 10 S 40.45 E 839.14 S 363.58
237 10 S 41.00 E 873.01 S- 392,96
l-ri
I
c
z
c
I'i'1
Z
CD
SCU 33A-8
Page 11
DATA INTERPO~T~ FOR ]000 PT HEAS~JRED DEPTH INTERVAL
lO/Z2/9o
HEtS INCLN VERT-DEPTHS SECT DIRECTION REL-COORDINA~$ CLOSURE Dr./
· DEPTH ANGLE BKB SUB-S DIST BEARING FROH-~I~.~-HEAD DIST BEARING 100
0 0.00 0 -154 0 N 0.00 El 0 N 0 E 0 N 90.00 E 0.0
1000 0.77 1000 846 -4 N 26.70 E 5 N I W 5 N' 8.94 W 0.2
2000 0.33 2000 1846 -14 N 74.30 ~1 15 N 3 W 15 N 12.56 W 0.3
3000 0.12 3000 2846 -19 ii 53.10 W 17 N 9 W 19 N!~28.55 W 0.2
4000 0.32 4000 3846 -20 N 13.50 E 19 N 7 W 20 N 21.53 W 0.3
5000 1.15 5000 4846
6000 3.42 5999 5845
7000 3.20 6998 6844
8000 6.40 7993 7839
9000 22.20 8964 8810
-36 N 3.60 W
-63 N 17.30 El
-97 N 22.70 El
-90 fl 20.20 E
111 ii 7.30 W
36 N 8W
70N 1W
119 N 19 E
139 N 75 E
57 ii 134 E
37 N 12.71 ~ 0.1
70 Il 0.80 W 0.5
120 N 9.26 E 0.1
158 N 28.19 E 1.3
'145 ii 67.07 E 2.2
10000 26.85 9871 9717
11000 25.00 10771 10617
489 S 11.09 E
920 S 40.85 E
477 S 140 R
845 S 369 E
498 B 16,35 E 3.7
922 S 23.57 E 0.4
I
I
c
z
c
z
DEC-10-'90 16:46 ID:KRU/CI/NV DRILLING TEL N0:2656224 ~123 P25 .....
~eat Lan~ Direct/onal Z~JHin~. Znc.
1300
2600
3250
3900
4550
5650
61~00
7t§O
7600
6450
975O
104O0
11760
SSO 0 660 1300 t9~0 2600 3250 3900 4MO
Sect ion Departure
VERTICAL SECTION VIEN
ARCO ALASKA, INC.
Section at: S 27,0! E
, ............... TVD Scale,: ! inch- t300 fee~
OeP Scale.: i inch- t300 feet
Drawn ..... : iO/~2/go
-- . _
Harker Identification FID TVD SEC~ Il
kJ ~ O 0 0
.............................. - ........ Bj gI~TRA~ TIE-IN 9900 9761 446
C) PRO~CTED TO tit76 ~935 989
'~ .............. ~-~ '~'~ ............ -~* ~" 1
l
....... ~w,~ ~, .... ~'~ - -.'
..........
.........
.....
_
6~00 ~
.TN~N
,00
~)5,6'7
DEC-10-'90 16:47 ID.:KRV/CI/NV DNILLIN~ IbL NU:~bOb~ ~l~J ~
6rear ~an~ Directionul ~/llln~, Inc.
PLAN VlEkt
ARCO ALABKA. ZNC.
SCU 33A-B
DECLINATION.' 24.00 E
SCALE ....... : t inch - 200 feet
DRAHN ' 10/22/90
.... ,~, ..... ~ ........
I00
ZOO
800
BOO
gOO
tO00
1300
~- NEST: EAST
/
~ ...... 5r ............
l
200 300 40G 500 600 700 6OO 96~ IG~G tt~O
ARCO Alaska, Inc.
Post Office ~ox J00360
,Anchorage, Alaska 99510-0350
-Fe!ephone 907 276 't215
April 29, 1992
Mr. L. Smith
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject: Submittal of Subsequent Report for SCU 33A-8
Dear Mr. Smith:
..-t q ,.,I
ARCO Alaska Inc. sucessfully completed the reperforation of SCU
33A-8, H2 sands, from 10864'- 10870' on 2/27/92. Please refer to
the attached Well Service Report and Subsequent Report for the
details of this operation.
If you require any further information in this regard, please do not
hesitate to call Jim Zernell at 263-4107.
Sincerely,
d.C. Winn
Acting Regional Engineer
JCW:DRH:dh
Attachment
cc: Mr. W. Watson
Mr.B.C. Dehn
Marathon Oil Company
UNOCAL Corporation
RECEIVED
M AY - 1
Alaska Oil & Gas Cons. CommiSSiO~
Anchorage
AR. CO Alaska, Inc, is a Subsidiary of AtlaaticRich~ie0dCompany
STATE OF ALASKA
..
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS;
ORIGIN t
1. Type of Request: Operation Shutdown ~ Stimulate Plugging Perforate X
Pull tubing ~ Alter casing ~ Repair well ~ Pull tubing ~ Other
2. Name of Operator
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK 99510
5. Type of Well:
Development ~X
Exploratory
Stratigraphic ,,
Service
4. Location of well at surface
1959' FNL, 1987' FEL, Sec.8, T7N, Rgw, SB&M
At top of productive interval
2533' FSL, 1655' FEL, Sec. 8, TTN, Rgw, SB&M
At effective depth
2457' FSL, 1 587' FEL, Sec.8, T7N, Rgw, SB&M
At total depth
2430' FSLr 1 563' FELt Sec. 8~ T7N~ R9W~ SB&M
12. Present well condition summary
Total Depth: measured 11,178'
true vertical 10,935'
6. Datum elevation (DF or KB)
RKB = 1 54'. GL = 128'
7. Unit or Property name
Soldotna Creek Unit
feet
8. Well number
~CU 33A-8
9. Permit number/approval number
10. APl number
SO-133-20241-01
1 1. Field/Pool
Swanson River-Hemlock
feet
feet
Plugs (measured) 10,889-10,91 O' MD
Effective depth: measured 10,889'
true vertical 10,670'
feet Junk (measured)
feet
13.
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size
58' 18"
3332' 10-3/4"
9993' 7-5/8"
1547' 5-1/2"
measured
10,864'-10,870' MD (H2)
true vertical
10,648'-10,653' TVD (H2)
Cemented Measured depth True vertical depth
Driven 58' MD
2218 cu.ft, lead 3332' MD
& 1 50 sx Class G
743 sx Class G 9993' IvlD
74 bbls Class G 9631'-11178' MD
Tubing (size, grade, and measured depth)
3-1/2" @ 9375' MD; 2-7/8" from 9375'-10,805' MD
Packers and SSSV (type and measured depth)
Baker Model F-1 @ 10~762' MD
Stimulation or cement squeeze summary
Intervals treated (measured)
N/A
Treatment description including volumes used and final pressure
58' MD
3332' MD
9864' TVD
9631 '-10935' TVD
RECEiVE[)
~nchorago
14.
ReDresentative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation 116 5837 2 1325
1300
Subsequent to operation 178 7326 4 1525
15. Attachments ~ 16. Status of well classification as:
I
Copies of Logs and Surveys run __
Daily Report of Well Operations X Oil ..X Gas Suspended__
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
1400
Service ___
Form 10-404 Rev 06/15/88
Title Cook Inlet Regional Engineer
Date
SUBMIT IN DUPLICATE
,ARCO Alaska, Inc/, '}
~uD~l~l~ o~ AillntlC RiChfield Com~n~
WELL I PBDT FIELD- DISTRICT. ~TATE
CONTRACTOR / OPERATION AT RE~ TIM E
SWANSON R T VER PRODUCT I ON ~, GD/03
{,- WELL SERVICE REPORT
DAYS iDATE
,LSSo a
!~ co 0
I ~0~., C~
MAY- t l~
.A~aska Oii & Gas Cons. Commiss~O~'~
, ,[~ CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK
'4W'littllr lTlmp. J ~hlll Riel&:; J Vllll)llltyJ Whld' V-,l~ 'ISI.Illd
R,po. ,F . .,,.., k.**. ~ ~c~ ~,~
Anchorage
Well- scu 33A-8
Spud Date: 3/73
Original RKB: 17
Top of Hemlock: 10,810'
Arco, ,aska Inc. - Swanson River'
APl#: 133-20241-01
Completion Date: 5/73
Hanger Type'
Max. Hole Angle: 27°
ield
Well Type: Producer
Last Workover: 10/90
Hanger:
Angle @Hemlock' 25°
All Depths are RKB MD to Top of Equipment.
Jewelry
I 3997'
2 4012'
3 9375'
4 9621'
5 10,690'
6 10,762'
7 1 0,800'
8 10,804'
9 10,889'
Otis 3 1/2" "X" Nipple
1-1/2" Macco GLM dummied
3 1/2" x 2 7/8" X-Over
Liner Top Packer
2-7/8" "XA" Sliding Sleeve
Baker Model F-1 5-1/2"x2-7/8" Packer
Offs 2-718" "XN" Nipple I.D. 2.25"
Baker Wireline Entry Guide 0
Schlumberger Posi-Set Plug w/19' of Cement on top
Casing and Tubing
~ ~ Grade
18" 94# 0 58'
10-3/4" 40.5# N80 0 3332'
7-5/8" 33.7# Mixed 0 9993'
5-1/2" 20# N80 9631' 11,1 78'
3-1/2" 9.3# L80 0 9375'
2-7/8" 6.5# N80 9375' 10,805'
Description
Conductor Pipe
Sudace Casing
Production Casing
Liner
Tubing
Tubing
Perforation Data
Interval Zone FT SPF Date
10,864'- 10,870' H2 6 ,4' ~ 2/92
10,914'-10,930' 'H4 16 4 10/90
10,938'-10,946' H5 8 4 10/90
10,962'- 10,970' H5 '8 4 11/90
Comments
Repeal
Plugged
Plugged
Plugged
H2
H5
H5
PBTD -- 11,086'
TD = 11,178'
RECEIVEB
Gas Cons. Commission
Anchorage
Well SCU 33A-8
JLB 4/28/92 Rev.
ARCO Aiaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
Cook Inlet Engineering
January 8, 1992
Mr. L. Smith
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject: Application for Sundry Approval SCU 33A-8.
Dear Mr. Smith:
ARCO Alaska, Inc. proposes to reperforate the H2 Sand (10,864'-
10,870') in Swanson River Field producer SCU 33A-8. Please refer to
the attached submittal of the Application for Sundry Approval and the
Perforating Procedures for details of this operation.
If you require any further information in this regard, please do not
hesitate to call Murray Hamilton at 263-4384.
Sincerely,
j,~,,., "! ~~J'
._
J. C. Winn
JCW:MOH:czm:0115
Attachment
CC:
Mr. W. Watson
Mr. B. C. Dehn
Marathon Oil Company
UNOCAL Corporation
RECEIVED
,lAN - 9 t992
AJaska Oil & Gas Cons. (;omm~ss~on
Anchorage
ARCO Alaska, Inc. ia a Subsidiary of Aflentic Richfield Company
STATE OF ~ ...... , ..
ALASKA OIL AND GAS CONSERVATION ~MISSlON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Suspend
Alter casing _ Repair well
Change approved program _
Operation Shutdown_ Re-enter suspended well_
Plugging _ Time extension_ Stimulate .
Pull tubing _ Variance _ Perforate X Other
2. Name of Operator
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK
99510
5. Type of Well:
Development X
Exploratory _
Stratigraphic _
Service
4. Location of well at surface
1959' FNL, 1987' FEL, Sec.8, T7N, RDW, SB&M
At top of productive interval
2533' FSL, 1655' FEL, Sec.8, T7N, RDW, SB&M
At effective depth
2457' FSL, 1587' FEL, Sec.8, T7N, RDW, SB&M
At total depth
2430' FSL~ 1563' FEL~ Sec.8~ T7N~ RDW~ SB&M
6. Datum elevation (DF or KB)
RKB = 154'. GL = 128'
7. Unit or Property name
Soldotna Creek Unit
8. Well number
SCU 33A-6.,
9. Permit number
10. 'APl number
. 50-133-20241-01
11. Field/Pool
Swanson River/Hemlock
12. Present well condition summary
Total Depth: measured
true vertical
Effective depth: measured
true vertical
1 1,1 78' feet
1 0,935' feet
11,086' feet
1 0,849' feet
Casing Length Size Cemented
Structural
Conductor 58' 1 8" Driven
Surface 333 2' 10 3/4" 2218 cu. ft. lead
Intermediate 8, 15'0 sx Class G
Production 9 9 9 3' 7 5/8" 743 sx Class G
Liner 1 54 7' 5 1/2" 74 bbls Class G
Plugs (measured)
Junk (measured)
10,889'
Measured depth True vertical depth
58' MD 58' MD
3332' MD 3332' MD
9993' MD
9631-1 1 178'
9864' TVD
9631-10935'
13.
Perforation depth: measured
10,864'- 10870'; 10,914'- 10,930'; 10,938'- 10,946'; 10,962'- 10,970' MD
true vertical
10,647' - 10,652'; 10,692' - 10,707'; 10,714' - 10,721' TVD; 10,736' - 10,743' TVD
Tubing (size, grade, and measured depth
3 1/2" to 9375 MD; 2 7/8" from 9375' - 10,805' MD
Packers and SSSV (type and measured depth)
Baker Model F-1 @ 10r762' MD
Attachments Description summary of proposal _ Detailed operation program X BOP sketch *
14. Estimated date for commencing operation
January, 1992
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classific~o~=~a~ j~k E~lsVn~D
Oil X Gas ~.~ ~ _
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~ t ~,t.,~~ Title Cook Inlet Regional Engr.
FOR COMMISSION USE ONLY
servicej.~.N - 9 399
Alaska Oil & Gas Cons. Gommlssi?n~
An~h0r%n~ Date
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test~ Location clearance
Mechanical Integrity Test Subsequent form r'"~quire 10-~-~r-
ORIGINAl_ SIGNED BY I ' c~ 0_:_?_~. ......
Approved by the order of the Commission I_.ON,NIF C. SMITH Commissioner
IApprova_l N~o. . /
Date
Form 10-403 Rev 5/03/89
SUBMIT IN TRIPLICATE
PROCEDURE
Prior to Perforatine
1. Obtain a well test.
2.
Reperforation Procedure
Well SCU 33A-8
Shoot fluid level in tubing to verify liquid level is several hundred feet above
perforated interval. Load tubing with crude if necessary.
3. Contact Anchorage office to verify sundry approval before proceeding.
E-Line Perforating
1. Conduct safety meeting with appropriate personnel. Obtain diagram of the tool string
prior to commencing work.
2. RU E-line unit and lubricator. Make-up tool string of adequate weight bars, 2-1/8"
Hollow Carder perf guns @ 4 SPF and 0° phasing, decentralizer, and CCL.
3. Pressure test lubricator.
4. RIH with well shut-in and tie into Atlas Wireline PDK-100 Log dated 10/28/90.
5. Position perf gun at the PDK- 100 depth shown below and fire:
Gun No. Interval (PDK-100~ Footage (ffi Sand
1 10864-10870' ~ · ' H2
6. POOH. Confirm that all shots have fired. Repeat the gun run if necessary.
7. RD E-line unit.
8. Perform xylene stimulation treatment immediately following perf work.
RECEIVED
^lasl~a Oil & (las Cons. CommissiOn
gnchorage
Arco ~laska Inc. - Swanson River ~:ield
~- SCU 33A-8
Spud Date: 3/73
~rlglnal RKB: 17
· op of Hemlock: 10,810'
APl#: 133-20241-01 Well Type: Producer
Completion Date: 5/73 Last Workover: 10/90'
Hanger Type: Hanger:
Max. Hole Angle: 27° Angle @Hemlock- 25°
All Depths are RKB MD to Top of Equipment.
1
Jewelry
I 3997'
2 4012'
3 9375'
4 9621'
5 10,690'
6 10,762'
7 10,800'
8 10,804'
9 10,889'
Ot~ 3 1/2' 'X' Nll:~e
1-1/2' Idacco GLM dummled
3 1/2" x 2 7/8' X-Over
Tie-back Packer
2-7/8' Sliding Sleeve
Baker Model F-1 5-1/2'x2-7/8' Packer
Offs 2-7/8' 'XN' Nipple I.D. 2.313'
Baker Wire#ne EnW Guide
Schlumberger Posi-Set Plug w/19' of Cement on top
Casing and Tubing
18' 94# 0 58'
10-3/4' 40.5# NS0 0 3332'
7-5/8' 33.7# Mixed 0 9993'
5-1/2' 20# NS0 9631' 11,178'
3-1/2. 9.3# LB0 0 9375'
2-7/8' 6.5# NS0 9375' 10,805'
DeacrlBtlen
Conductor Pipe
Surface Casing
Production Casing
Liner
Tubing
Tubing
Perforation Dat~
10,864'- 10,870' H2 6 4 1/91
10,914'-10,930' H4 16 4 10/90
10,938'- 10,946' H5 8 4 10190
10,962'-10,970' H5 8 4 11/90
Plugged
Plugged
Plugged
PBTD = 11,086'
TD- 11,178'
RECEIVED
JAN - 9 1r99[
Alaska Oil & Gas Cons. Corem[ss%on
* ' Anchorage
We~ Scu 33A-8
JLB 3/5/91
E-Line BOPE's
Grease Head/
Hydraulic Packoff
Lubricator Extension
Manual Rams
Swab Valve
Double Master Valves
Wellhead
RECEIVED
JAN - 9 ~992
Alaska Oil & Gas Cons. commission
Anchorage
MOH 6/1/91
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4304
Tom Wellman
Regional Engineer
Cook Inlet Engineering
March 13, 1991
Mr. L. Smith
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Smith:
Attached is a subsequent report of operations for the perforating of
SCU 33A-8.
Perforations in the H4 and H5 sands were isolated behind a plug set
at 10,908' with 19' of cement on top. SCU 33A-8 was subsequently
perforated in the H2 interval from 10,864' to 10,870' MD on January
13, 1990.
The well is currently producing approximately 169 BOPD, 17,016
MCFPD and 6 BWPD.
Sincerely,
~ /;, .
/~&. Wellman
,,ff*~gRegional Engineer
TW:jkw:0091
Attachment
cc: Mr. A. R. Kukla
Mr. B. C. Dehn
Marathon Oil Company
UNOCAL Corporation
ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company
i"" STATE OF ALASKA (']
ALASKA OIL AND 6AS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Type of Request: Operation Shutdown
Pull tubing ~
2. Name of Operator
ARCO Alaska. In(;,
3. Address
P. O. Box 100360, Anchorage, AK 99510
4. Location of well at surface
1959' FNL, 1987' FEL, Sec. 8, T7N, Rgw, SB&M
At top of productive interval
2533' FSL, 1655' FEL, Sec.8, T7N, Rgw, SB&M
At effective depth
2457' FSL, 1587' FEL, Sec.8, T7N, RgW, SB&M
At total depth
2430' FSLt 1563' FEL~ Sec.8t T7Nt Rgwt SB&M
12. Present well condition summary
Total Depth: measured 11,178'
true vertical 10,935'
Stimulate
Alter casing ~ Repair well
5. Type of Well:
Development X
Exploratory __
Stratigraphic __
Service
I
feet
feet
Plugging ,,
Plugs (measured)
X Perforate X
Pull, tubin9 Other
6. Datum elevation (DF or KB)
RKB = 154'. GL = 128' feet
7. Unit or Property name
Soldotna Creek Unit
8. Well number
SCU 33A-8
g. permit number/approval number
10. APl number
50- 133-20241-01
11. Field/Pool
Swanson River-Hemlock
10,889-10,91 O' MD
Effective depth: measured 10,889'
true vertical 10,670'
feet
feet
Junk (measured)
13.
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size
58' 18"
3332' 10-3/4"
9993' 7-5/8"
1547' 5-1/2"
measured
10,864'- 10,870' MD (H2)
true vertical
10,648'- 10,653' TVD (H2)
Cemented
Measured depth
True vertical depth
Tubing (size, grade, and measured depth)
3-1/2" @ g375' MD; 2-7/8" from 9375'- 10,805' MD
Packers and SSSV (type and measured depth)
Baker Model F-1 @ 10~762' MD
Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
Driven 58' MD 58' MD
2218 cu.ft, lead 3332' MD 3332' MD
& 150 sx Class G
743 sx Class G ggg3' MD g864' TVD
74bblsClassG 9631'-11178'MD 9631'-10935'TVD
RECEIVED
,Oil.& Gas Cons.
14.
F~eDresentatiye Daily Averi~ge Production or Injection D~l;a
Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
0 100% 0 0
3600
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations . ..
169 17~016 6 1500
2000
16. Status of well classification as:
Oil X Gas Suspended Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed .//~A.~J~,.~/~ /r~/¥~ ~,{ tle Cook Inlet Re,qional Engineer
Form 10-404 Rev 06/15/~88
Date ~// ~/~ [
SUBIdlT IN DUPLICATE
WELL
i ',JANSON RIUER TEL N0:26~' ~ ~680 P06
ARCO Alaska, Inc.~ )
WELL SERVICE REPORT
CON~'R.,~GTO~ -- - '
~.,~.: g . ~..,-y o,-
- IOPEFIATION-AT FI[:I=<T:)FIT'tr]I~I~ - - - " ~' ' -
CHECK THiS BLOCK IF SUMMARY CONTINUED ON BACK
.VV. mtmr iTem, [Cl~lll Factor I Vlllblllty I w,nd Vet
I$1gnld _ ,.
ARCO Alaska, Inc. ~) 1
6ul~ ~ Atlantic i~iohflelCl Coral:tony
~PaDT I FIE~- ~ISTRICT- 8TA~
~T~CTOR - -
OP~TION AT RE~ TIME
~408 PO~ ,. -
'WELL SERVICE REPORT
IDA*tS DATE
'/:-/I.. c~
/, ;../.,,.,/iF',- '- '
· , . ,i i i , ,
_ i . ii i i i ·
,1 ._. i i , · . ,,.,,,,, ii . - , . _ il . i
[
#ther j t=p. ..... ~iii Rarer J'.'lbill~' ~nd vet
"~ J .......... 'P ~ 'FI mll~ ! knntn
ARCO Alaska, Inc.
~ Of Atflrltl= F~flfl~d Coml:m~y
WEL~ .... i'P~DT IFIELD. DIETRICT. STATF..
GONTR,a~OTC~ - ..- -- "' -~- ' .~. IOPERATION AT REPORT TIME
n~An~ I
O9.go- /090
~408 PO6 .....
WELL SERVICE REPOR'I
I _ ,, . _. Il I , , .... . Ill . Il I , , I ___--- ,
CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK -,
~""" j'"~: --I ~''"''"°' I v,,,.,~' l"w,,, v,,. --' !"""~
JAN-Al-' 91 0,'7:41 It
ANSON RIUER
TEL N0:26~
:J96 P05
ARCO Alaska, Inc.
I~lafy of Atlantlo Riohfleld Coml~n¥
]FIELD'-'I~ISTRICT- STATE
OPERATION AT REPORT TIME
WELL SERVICE. REPORt
., _ · i ii ii i .... l, ill · I _ . Il I
.. [... i iii . i., _ · _. [ , [q,_ , . -_
,i,
CHECK THIS BLOCK IF SUMMARY cONTINUED ON BACK
IV~tlfhaw I T,mnn. I ,,~hfl, t'..,... I ~;,.,,-,,,,.. I,., ......
.....
iJ I ,1 ._ Il I Ill mi - :- i
,
'~tANSON RIUER TEL N0:265( ~ ~366 P03
ARCO Alaska, Inc.
8ubllcll~ Of Atl~ntl= RiChfield Company
WELL SERVICE REPORT
WELL
CONTRACTOR
REMARKS
|OPERATION AT REPORT TIME
I p!o¢ ..~o'P co. ~. c.
_O_ . .pO0 '
/4. o. o.~.
/
/ Po'&
-- 1 '1 Jill . i .... i ii ii '
E~ CHECK THIS BLOCK IF SUMMARY CONTINUED ON I!iACK
wlllhMReport j Te~. 'F ~ 'Chili Fl're, j Viliblll~eF, .11.. [ WMd VM.
ARCO ALAS~ INC.
Cook Inlet/New Ve90ures Engineering
g490
TRANSMISSION
T(Z. Commissioner FROM:
COMPANY: AOGCC
DATE: 1/22/91
Victoria Ferguson
COMPANY: ARCO Alaska, Inc
WE! Jl~ NAME: SCU 33A-8
Transmitted herewith are the following
Blue Sepia Sepia i Fape &
Line Folded Rolled IMylar listing
PDK-100 1
,
,,
,,,~?,~!:Retum, reciept:to ARCO,~SKA, Inc.
~~: ~JudY Boegler AWn I390A
Post Office Box 100360
Anchorage, AK 99510-0360'
RECEIVED
Alaska Oil & Gas Cons. Commission
Anchorage
ARCO ALASKA INC.
Cook Inlet/New Ventures Engineering
g476
TRANSMISSION
T~. Commissioner
COMPANY: AOGCC
DATE: 12/20/90
FROM: Victoria Ferguson
COMPANY: ARCO Alaska, Inc
WELL NAME: Listed below
Transmitted herewith are the following
Blue Sepia Sepia rape &
Line Folded Rolled Mylar listing
SCU 33A-8 Z-Densilog,Comp. Neutron ~/ 1 1
Temp Log ~f 1 1
Venilog ~ 1 1
PDK- 100 Gamma Ray c~ 1 1
Seg. Bond v 1 1 .
ACB VDL/Si~n./GR ~-- 1 1 ....
DIL FOCUSED GR ,/ 1 1
DIF Temp ,Log .~..~ ~. ~ ~ 1 1
SCU 13z9 Photon Log Gravel Pack Survey 1 1
SRU 31-15 Collar Log 1 1
BRU 214-26 Formation Multi-Tester GR 1 1
BHC ACOUSTILOG GR 1 1
Receipt Acknowledgement: _~_~.n,,.
Date:
Return reciept to ARCO ALASKA, Inc.
ATrN: Judy Boegler ATO 1390A
Post Office Box 100360
Anchorage, AK 99510-0360'
RECEIVED
DEC 2 6 1990
Alaska Oil & Gas Cons. 8ommission
Anchorage
A oKA OIL AND GAS CONSERVATION CO;',,IMIsSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Classification of Service Well
OIL [~] GAS r'~ SUSPENDED ~=~ ABANDONED D SERVICE ~]
2 Name of Operator 7 Permit Number
ARCO Alaska, Inc ,.. 72-17-//
3 Address . ?' 8 APl Number
P.O. Box 100360, Anchorage, AK 99510-0360 ~ ...... 50-133-20241 -
4 Location of well at surface,J ~.~',},~-.,.' .'~_ .7'~;~~ -.-,- ,'~ 9 Unit or Lease Name
1959' FNL, 1987' FEL, SEC 8, T7N, R9W, SM
.~~~.~ SOLDOTNA CREEK UNIT
At Top Producing Interval 10 Well Number
2507' FSL, 1658' FEL, SEC 8, T7N,.R9W, SM SCU 33A-8
At Total Depth 11 Field and Pool
2423' FSLt 1573' FEL~ SEC 8. T7N~ RgwI SM SWANSON RIVER FIELD
5 Elevation in feet (indicate KB, DF, etc.) 6 Lease Designation and Serial No. HEMLOCK OIL POOL
RKB 154' GL 128' A-028996
12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susj3. or Aband. 115 Water Depth, if offshore ]16 No. of Completions
10/10/90. 10/21/90. ~ ~,t ,/0 ~/')OI NA feetMSLI 1
17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of permafrost
11,178'MD/10,935'TVD 11,086'MD/10,850'TVD YES ['~ NO D NA feetUD NA
22 Type Electric or Other Logs Run
DIL/CNL/LDT/GR/SP/CALIPER/CBL/PDK 100~ GYRO
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
18" LINE PIPE SURF 58' DRIVEN
10-3/4" 40.5# K-55 SURF 3332' 15" 2218 FT3 OR 150 SX LEAD CLASS G
7-3/8" 26.4/29.7/33.7# S-95/N80 SURF 10~672' 9-5/8" PLUGGED ~ 9330' W/120 SX CLASS G
5-1/2" 20# N80 9930' 11178' 6-1/2" 360 SX CLASS G
I
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
3-1/2" 10~805' 10~762'
10,938'-10,946' MD 10,715'-10,722' TVD
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
10,914'-10,922' MD 10,693'-10,700' TVD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
....
27 PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
DateofTest Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE I GAS-OILRATIO
I
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28 CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recoverd and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
H SANDS 10851 10635
31. LIST OF ATTAC'HMENTS ....
G)/ro, Well History
32. I hereby certify that the foregoing is true and coirect 'to the best of my knowledge
Signed ~' · , _ ..-.- ..... Title AREA DRILLING ENGINEER Date __
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
Well Hi,tory - Initial Report - Dail~
IIIIIIl~tlOal: PraDIrl end lubmlt th4 "I#I~M Regort" off the flrl~ WlcIr41duly If~ll I wail Il lDUdCIId o1' workover opirltlonl am i/.Irllci.
Dilly wOW prior to I,Ouddlng should be ~ummlrizid on the form giving inclullve duItll only.
District
ARCO ALASKA INC.
Field
SWANSON RIVER
Auth. or W.O. no.
AD6862
lCounly. I)lrmh or i~orough
KENAI
LalM or Unit
ADL: A-028996
Title
DRILL & COMPLETE
Istlll
AK
Operator
ARCO
Spudded or W.O. begun IDate JHour
SPUD 10/10/90 06:00
Dale andu depth
as of 8:00 a.m.
09/27/90 (1)
TD:10130' (10130)
SUPV:WH
09/28/90 (2)
TD:10130'( 0)
SUPV:WH
09/29/90 (3)
TD:10130' ( 0)
SUPV:WH
09/30/90 (4)
TD:10130' ( O)
SUPV:WH
10/01/90 (5)
TD:10130'( 0)
SUPV:WH
10/02/90 (6)
TD:10130'( O)
SUPV:WH
ComDlete record for elch day reported
GRACE 154
NU BOPE MW: 0.0 VIS: '0
ND TR~E,NU 13-5/8" BOPE
ARCO WI
48.4864
Prior status if · W.O.
DAILY:S72,125 CUM:$72,125 ETD:S72,125 EFC:$1,320,000
PU 4-3/4" DC MW: 9.0 VIS: 65
FIN NU 13-5/8" BOPE,RU CHOKE LINE, DEGASSER,pIVERTER LINE &
FUNCTION TEST BOP, NU FLOWLINE & 6" LINE TO TRIP TANK, TEST
BOP,RAM LINES,VALVES TO 5000 PSI, HYDRIL TO 3500 PSI,INSTALL
WEAR BUSHING, Rd ATLAS WIRELINE, RUN GR-CCL-CBL, RD ATLAS,PU
6-1/2" BIT, 7-5/8" SCRAPER, TWO 4-3/4" DC, RIG DOWN-ELECTRICAL
PROBLEM ON DRAW WORKS,CONT. TO PU 4-3/4" DC.
DAILY:S21,741 CUM:$93,866 ETD:S93,866 EFC:$1,320,000
TIH W/ TRISTATE METAL MUNCHER MW: 9.0 VIS:118
PU 3-1/2" DP,STRAP IN HOLE, DISPLACE HOLE W/HI-VIS MUD,POOH
LD 7-5/8" SCRAPERS, PU TRI-STATE M~TAL MUNCHER/OIL
JARS/BUMPER SUB, SERVICE RIG, RIH, FILL PIPE EVERY 10 STANDS
DAILY:S35,282 CUM:$129,148 ETD:S129,148 EFC:$1,320,000
CUTTING SECTION @ 9973' MW: 9.0 VIS:131
CUT 100' DRLG LINE, RIH TO 9925',CUT CSG SECTION 9925-9963'
QUIT CUTTING, CIRC., PULL 10 STDS,WELL SWAbBING, TRIP BACK TO
BOTTOM, CIRC.,POOH, CHANGE OUT TRI-STATE METAL MUNCHERS,TiH
FILL PIPE EVERY 10 STDS,CUT CSG SECTION 9963-9973',MUD WATER
CUT 9.0 TO 8.3 PPG ON BOTTOMS UP.
DAILY:S20,269 CUM:$149,417 ETD:S149,417 EFC:$1,320,000
RIH TO SET CMT PLUG MW: 9.1 VIS: 43
FIN CUTTING CSG SECTION 9973-9983',CBU, POOH, LD METAL
MUNCHER/JARS/BUMPER SUB, PU 6-1/2" BIT, RIH, BIT WOULD NOT GO
PAST 9983' (BTM OF SECTION),CIRC HOLE CLEAN CONDITION MUD
POOH, STRAP ANDPU 2-7/8"WORK STRING, RIH TO SET CMT PLUG
DAILY:S32,951 CUM:$182,368 ETD:S182,368 EFC:$1,320,000
POOH MW: 9.1 ViS: 54
FIN RIH TO SET CMT PLUG, CIRC @ 9980',RU HOWCO TEST LINES TO
4000#,BATCH MIX CLASS G SLURRY (.5% CFR-3,.45% RALAD-344
.20% HR-7) @ 16.6 PPG, PUMP 18 BBLS CMT,DISPLACE CMT W/MUD
AFTER 46 BBLS DISPL. PRESSURE BUILT TO 5000 PSI,SHUT DOWN
POOH AND LD 30 JTS 3-1/2" DP AND 15 JTS 2-7/8" TBG FULL OF
CMT, CLEAN CMT OFF FLOOR/BOP SUB BASE/CELLAR, PU BIT AND RIH
CIRC AND COND MUD, POOH
DAILY:S30,323 CUM:$212,691 ETD:S212,691 EFC:$1,320,000
The above I$ ~9~rect
sio,,,tu,V" I I .% --
Fol' fo~ ~re~tl~n ~d~'b~l~,
~e Pmcedu~nuat~l~ 10.
O~lllng, P.ge~
AR3B-459-1-D
INumberall dually ~11 hletory for.~ consecutively Page no.
as they are preplmdu for IlCh well. I
I
ARCOOIla~ asCompany O
Dally Well History--lnterir
IflltllictlcHle: This form il utld Ourirlg ~nlling or work. over O~rltlOnl. If tilting, cortng, ot ~dOrlhng. ShOW fo~lti~ ~lml ~ ~llCrl~i~ *Ork ~lrf0rmeO
Number III ~tlll Itlm IIItl Hqulntillly. A~Kh ~ti~tlOn of Ill corll. Work ~tfO~l~ by Producing Section will bi rlpO~l~ On "l~l~ll'
comgllt~Ofl. RI~O~ offiCill o~ ~rlHnllti~ tl~ ~ "F~I' IO~. 1) Sub~t 'IIIIM" ~.tt when tille~ oul but not IIII f~Qulnily thin ivlry
O~ Wl~ll~ly ol {~1 wiik i~ w~ich oil ~ il ~. S~bmlt wltkiy for worko~ I~0 followmg ~ttmg of OH Itrln~ unhl completion.
OiltriCt lCOunty o. P,r,sh jst.,.
AR~0 ALASKA INC. I KENAI AK
I LIIII or Umt
SWAN~QN RIVER ] ADL: A-028996
Olta mhd Olpth Complete record for Ilch dly whde c]r~limg or workovlr m progrmIs
al of 8:00 i.m.
GI~%CE 154
10/03/90 (7)
TD:10108' ( 0)
SUPV:WH
10/04/90 (8)
TD:10108' ( 0)
SUPV:WH
10/05/90 (9)
TD: 9930'( 0)
SUPV:EB
10/06/90 (10)
TD: 9930'(
SUPV:EB
WOC MW: 9.1 VIS: 52
STRAP & PU 16 JTS 2-7/8" TBG, RIH, SLIP 50' DRLG LINE, PU 17
JTS 3-1/2" DP, RIH TO 9975, CIRC, RU HOWCO, BATCH MIX CLASS
G CMT, 15 BBLS SLURRY DISPLACE W/66 BBLS MUD, PULL 6 STDS
SQUEEZE 1 BBL AWAY, POOH, CUT DRLG LINE, PU BIT & 4-3/4" DC,
RIH TO 9500' SLM, CIRC &woc.
DAILY:S33,010 CUM:$245,701 ETD:S245,701 EFC:$1,320,000
TEST BOPE MW: 9.1 VIS: 46
WOC @ 9500',WASH TO 9550',DRLG CMT STRINGERS TO 9725',CLEAN
OUT SOFT CMT TO BTM OF WINDOW @ 9983',CIRC AND COND MUD,POOH
PICK UP 16 JTS 2-7/8" TBG AND TIH TO 9980',CIRC AND RU HOWCO
PUMP 5 BBLS H20 W/2% CAUSTIC,TEST LINES TO 5000#, BATCH MIX
80 SX CLASS G CMT BLENDED W/.3% CFR-3 AND .2% HR-7 @ 16.6
PPG, PUMP 12 BBLS H20 W/2% CAUSTIC-3 BBLS FRESH WATER-14.8
BBLS CMT, DISPLACE WITH 3 BBLS WATER AND 64 BBLS MUD WHILE
HOLDING 500 PSI BACK PRESSURE,PULL 7 STANDS, SQUEEZE .5 BBL
AWAY @ 2200 PSI,REV OUT DP,PUMP DRY JOB, POOH, LD 16 JTS
2-7/8" TBG AND 32 JTS 3-1/2" DP,PULL WEAR BUSHING, TEST
BOPE.
DAILY:S32,809 CUM:$278,510 ETD:S278,510 EFC:$1,320,000
ORIENT MUD MOTOR MW: 9.1 VIS: 35
FIN TESTING BOPE, RE-SET WEAR BUSHING, BLOW DN CHOKE AND MUD
LINES,PU 6-1/2" BIT AND DRLG ASSY.,TIH TO 9487',WASH 9487'
TO CMT @ 9670',DRLG MED. FIRM CMT FROM 9670' TO 9885' AND
SOFT CMT FROM 9885' TO 9925',CIRC AND COND MUD, WOC,DRLG MED
FIRM CMT FROM 9925' TO 9930',CIRC/MIX/PUMP DRY JOB, POOH, LD 9
4-3/4" SPIRAL DC, PU NEW BHA, TEST MTR AND MWD, TIH TO 5060'
SLIP DRLG LINE AND FILL DP,CONT TIH TO 9900',BREAK CIRC AND
ORIENT MOTOR @ 9930'
DAILY:S23,374 CUM:$301,884 ETD:$301,884 EFC:$1,320,000
REVERSE OUT DP MW: 9.2 VIS: 37
ATTEMPT TO SIDETRACK, GOOD CMT 9930-9932',PLUG DETERIORATED
WOULD NOT HOLD TOOL FACE, CLEAN OUT BAD CMT TO 9980'
CIRC/MIX/PUMP DRY JOB, POOH, STD BACK KICKOFF ASSY, BRK BIT
REMOVE MWD BATTERY PACK, TIH W/6-1/2" BIT TO 9920',REAM
9920'- 9980',DRLG CMT 9980'-9983',WORK BIT THROUGH TOP OF
STUMP AND DRLG TO 9985', HARD,CIRC/MIX/PUMP DRY JOB, POOH,PU
16 JTS 2-7/8" TBG AND TIH, SERVICE RIG, CONT TIH TO 9985',CIRC
AND RIG UP BJ TITAN, TEST LINES TO 5000#,PUMP 17 BBLS 2%
CAUSTIC WATER PREFLUSH ~ 3 BBLS FRESH WATER, PUMP 84 SX
CLASS G CMT(14;8 BBL) BLENDED W/.6% CD-31/.15% R-1 @ 16.4
PPG,DISP. AND SPOT CMT W/4 BBL WATER AND 60 BBL MUD WHILE
HOLDING 500 PSI BACK PRESSURE, PULL 7 STDS,CIP @ 0600 HRS
DAILY:S26,502 CUM:$328,386 ETD:S328,386 EFC:$1,320,000
32A-$
Tho Ibova II correct
s,on.t..,.-"'" l
For form i:)riba~tio~
He Procedure~nUll ~lction 10, / \
AR38-459-2-B
"Number all daily will hiltory tOrreS consecutively
as they are prel:,arecl for each well.
Page no
ARCO Oila~ ,asCompany
Daily Well History--lnterir
II~ll~ellOIIl: Thai form il "#d c:lunng drilling or workovlr Ol:)4rltIOnl. If testing, coring, or glrforllmg, show fOrmlliO~ IIime m dllCril:)i~lg work OtrlormiO.
NumOlr Iii drill Item relll #Quentlelly. Attlch ~lCrtl)tion of oil corel. Work I)lrformod by Producing Section will 1:)4 rel~orted on "ln#rlel" IJllfll until flail
coml)letton. PII~Or~ officill Or rel:)rl#ntltlVe tilt on "(11#11" foe1. 1) Submtt "1#11,111" i1%li{I whtn filled out I)ut not IiiI freq,lntly thin ivlry 30 dlyl. Oil' (2)
orl WldnllCSly ol thl Wtlk in which oil Ilrlno il Ne. SlJI)fl%It welkly for workovlre and Iollowmg ~4ttlng of oil Ilrm§ unlH coml:)lltlOfl.
Diltrict
ARCO ALASKA INC.
Field
SWANSON RIVER
County or PlrlIh IStiiA
I
KENAI
LIIN or Unit
ADL: A-028996
AK
s£lJ 33A-8
Dill arid ~IIoII~
II of 8:00 a.m.
10/07/90 (11)
TD: 9930'(
SUPV:EB
10/08/90 (12)
TD: 9930'(
SUPV:EB
0)
10/09/90 (13)
TD: 9930' ( 0)
SUPV:EB
10/10/90 (14)
TD: 9988'( 58)
SUPV:EB
$)
10/11/90 (15)
TD: 9993'(
SUPV:EB
Complele record for each OAy while <~rilhng or workovAr m I:)rOgrAll
GRACE 154
POOH MW: 9.2 VIS: 35
REVERSE OUT 2 BBLS CMT, PUMP DRY JOB, POOH, LD 23 JTS DP AND 16
JTS 2-7/8" TBG, PU 6-1/2" BIT, TIH TO 9500',WASH 9500'-9631'
DRLG MED TO SOFT CMT TO 9800',CIRC & WOC, DRLG MED CMT
F/9800-9815',APPROX 150 FT/HR, CIRC AND WOC,DRLG MED FIRM
CMT AT 9815',NO APPARENT CHANGE IN COMPRESSIVE STRENGTH IN
PAST 10 HRS,DRLG AT 150 FT/HR F/9815'-9848',ROP INCREASED
VERY POOR CMT THROUGH SECTION AREA, PULL UP TO 9985',CIRC
BTMS UP,MONITOR WELL, FIRST 30 MIN APPEAR STATIC,VERY LIGHT
FLOW OVER NEXT 30 MIN-ESTIMATE I BBL/HR INFLUX,PUMP DRY JOB
POOH
DAILY:S31,831 CUM:$360,217 ETD:S360,217 EFC:$1,320,000
POOH MW: 9.2 VIS: 34
CONT POOH,MONITOR THE WELL FOR FLOW,APPROX. i BBL/HR INFLUX
MODIFY 2-7/8" MULE SHOE AND CUT DRLG LINE,PU 16 JTS TBG
SERVICE RIG, TIH, SPACE OUT TBG TAIL W/PUPS @ 9984',CIRC BTMS
UP,GAS CUT TO 8.7+,CONT TO CIRC AND RIG UP BJ TITAN, MIX
7BBL 2% CAUSTIC PREFLUSH AND BATCH MIX CMT-87 SX CLASS G/l%
CD-31/.9% A-2/.35% R-11 AND 1 GAL/100 SX FP-6L @ 16.5 PPG
PUMP 3 BBLS CAUSTIC FLUSH AND 3 BBLS FRESH WATER, PUMP 14.8
BBL CMT, FOLLOW W/3 BBLS FRESH WATER, DROP DP DART,DISPLACE
WITH 69 BBL MUD, PLUG DID NOT BUMP,POOH 9 STDS,CIP AT 20:00
MRS,REVERSE OUT AT 9150' 1/2 BBL TO SURFACE, SHUT WELL IN
WITH 2000 PSI,WOC, RELEASE PRESSURE AFTER 8 HR, PUMP DRY JOB
POOH
DAILY: $30,553 CUM: $390,770 ETD: $390,770 RFC: $1,320,000
ORIENT MOTOR MW: 9.2 ViS: 36
CONT POOH, STD BACK 2-7/8" TBG, FOU~TD HOLE IN DP @ 7052',PU
6-1/2" BIT AND TIH, TAG CMT @ 9680',DRLG M~D FIRM CMT
F/9680' TO 9880',ROP CONSISTENT @ 90 FT/HR, CIRC AND WOC
DRLG FIRM CMT 9880' TO 9930',ROP CONSISTENT @ 69 FT/HR, CBU
AND MONITOR HOLE, STABLE, PUMP DRY JOB, POOH, LD 2-7/8".TBG FROM
DERRICK, MAKE UP BIT AND TEST MWD AND MOTOR, TIH TO 9900',BRK
CIRC AND WASH TO 9930'
DAILY:S23,030 CUM:$413,800 ETD:S413,800 EFC:$1,320,000
SIDETRACK PLUG MW: 9.2 VIS: 35
ORIENT MTR AND SIDETRACK WITH KICKOFF ASSY @ 9930',DRILL TO
9988'
DAILY:S32,096 CUM:$445,896 ETD:S445,896 EFC:$1,320,000
POOH MW:10.0 VIS: 36
SIDETRACK OUT 7-5/8" CSG SECTION 9988'-9993',SURVEY AND PULL
INTO CSG, MONITOR WELL, FLOWING APPROX. 2 BPH,CIRC AND
INCREASE MUD WT F/9.2 TO 9.5 PPG, MONITOR WELL, 15 MIN. STABLE
The AbOVe il correct P[~ DRY JOB, POOH, NORMAL HOLE FILL, RE/~OVE MWD BATTERY PACK
SignAture CLEAN MUD PITS~ERVICE RIG, TIHIW$6-1/2" BIT AND STABS TO
9725',WASH AND~ REAM WINDOW SECTION F/9925' TO 9993' ,CBU, RUN
For form I~rel~lrltion end diltribulion
,I Proceduro, Monuol Section 10.~,"~',~
Drilling, Pig# Se Ind 87
AR3B-459-2-B
I Number Ill daily well history lorms consecutively
as they ere prepArect for eActt well.
IPage *=
ARCO OII a{: ,as Company
Dally Well History--lnteri~
Iltlllll~bi#l: Thll form il Ulld during d~tlling Of wOH~OVer o~Irllionl. If lilting, coring, or ~trforlhl~g. Ihow formlho~ name in dllCribing work performe~3.
Numl:~r I11 <~r~ll Item tlltl le<luehllllly. At, Ich ~l~,iDt~on of &Il co,Il. Wo,k ~.lrform.l¢l by Producing Section will bt ~ll}orted O~ "lallrlll" Ihlltl until finll
completion. Rlporl officill o, ~prelentltlvl tim git "FIII~" form 1) Submit "lalerbi" %hlltl thin filled out but ilO, Iiii frequently fhifl Ivlry 30 dlye. or
OIl ~Vldhlldly OF the wtlk if1 whiCl~ oil Itdl~ il lei. S~bmit weekly for workov~l Ind following letting of oil If,lng Ut, iii completion.
OII,,.C, ltD..fy or P.,,.,
F~a~dARCO ALAS~.% ~N~ I KENAI
I
I ADL: A-028996
CompJefe rico,el for each dly while Orllhng or workover ~n progrell
SWANSON R~VSR
Date in,'l clepth
es of 8:00 a.m.
10/12/90 (16)
TD:10050' ( 57)
SUPV:EB
10/13/90 (17)
TD:10138' ( 88)
SUPV:EB
10/14/90 (18)
TD:10218' ( 80)
SUPV:EB
1.0/15/90 (19)
TD:10330'( 112)
SUPV:EB
10/16/90 (20)
TD:10476'( 146)
SUPV:EB
GRACE 154
SPERRY SUN GYRO SURVEY WHILE CLEANING BALANCE OF MUD PITS
LIGHT FLOW, SHUT IN AND MONITOR PRESSURE WHILE BUILDING NEW
MUD, 500 PSI AT 01:00 HRS, INCREASE NEW MUD WT IN PITS TO 10
PPG, DISPLACE 9.5 PPG LIME WINDOW MUD TO 10.0 PPG W/15 BBL
DESCO WATER SPACER AHEAD OF NEW MUD, BUILD MUD VOLUME
CIRCULATE TO CONSTANT 10.0 PPG, TEST FORMATION TO 14.5 PPG
EMW MIX DRY JOB
DAILY:S35,868 CUM:$481,764 ETD:S481,764 EFC:$1,320,000
DRLG WITH MOTOR MW:10.0 VIS: 44
POOH,NORMAL FILL, LAY DN STABS,TEST BOPE, RESET WEAR BUSHING
PU MWD BATTERY PAC, TEST MOTOR AND MWD,TIH TO 9985',SURVEY
AND ORIENT TOOL FACE,DRLG WITH MOTOR 9993'-10050',BTMS UP
GAS CUT TO 9.6 PPG
DAILY:S51,014 CUM:$532,778 ETD:S532,778 EFC:$1,320,000
POOH MW:10.0 VIS: 42
DRLG W/MTR 10050'-10138',SURVEY,CIRC AND PULL UP INSIDE CSG
SLIP DRLG LINE, MONITOR HOLE,VERY LIGHT FLOW, PUMP PILL AND
POOH, NORMAL HOLE FILL, LD MTR AND BENT SUB, PU NEW BHA, TIH TO
9925',WASH AND REAM MTR RUN F/9930'-10138',BTMS UP GAS CUT
9.8 PPG, CBU AND RIG UP SPERRY SUN, RUN GYRO SURVEY,PUMP DRY
JOB
DAILY:S28,182 CUM:$560,960 ETD:S560,960 EFC:$1,320,000
DRILLING AHEAD MW:10.1 VIS: 44
POOH,NORMAL HOLE FILL, LD STEEL STABS,PU NEW BHA, TEST MWD,TIH
TO 10138' (NORMAL) DRLG TO 10218',BTMS UP GAS CUT TO 9.8
DAILY:S29,845 CUM:$590,805 ETD:S590,805 EFC:$1,320,000
DRILLING AHEAD MW:10.0 VIS: 44
DRILLING 10218'-10233',SHORT TRIP TO 7-5/8" CASING (NORMAL)
DRLG 10233'-10330'
DAILY:S27,285 CUM:$618,090 ETD:S618,090 EFC:$1,320,000
DRILLING AHEAD MW:10.0 VIS: 43
DRILLING 10330'-10340',SHORT TRIP TO 7-5/8" CSG, NORMAL
DRILLING 10340'-10352', REPLACE SWIVEL WASHPIPE,DRILLING
10352'-10460',SHORT TRIP TO 7-5/8" CSG, DRILLING
10460'-10476'
DAILY:S28,029 CUM:$646,119 ETD:S646,119 EFC:$1,320,000
AK
IWell ~.~
scp 3~-8
Tho above il co,Itc,
$ignatu O ·
For form prepar-atio~ &n~ 011trlbution
lei ProcldurlI,Mlnull ~ctioh t0.
AR3B-459-2-B
INumbor all daily well hiltory forms conleculively
as they are prepared for each well.
ARCO Oil at( ,al Company
Dally Well History--lnterir
Iltlflliolklltl: Thai form il ulOd dunng drHIIn~ or lorkover oDer&tlonl. If tilting, coring. Or ~dOrlliflg. thow formlh~ filet i~ dllCribing wo~ ~rformeO.
NumDIr III drill Itlm tl~l ~flltllly. A~lCh ~Kriplion of III CO~I. Work ~rfo~O by PmOucing Seclion will ~ moo~ed on "IflMHM" ~llll uflt~l hnll
compllllo~. ~lpO~ o~icsl or ~p~lltt~ IW ~ "F~" Io~. 1) Submit "lall~" ihflll l~lh hlllO out ~ut n~ It~ l~qulntly t~l~ IVl~y ~ ~lyl. Of (2)
On Wldnlldiy of the will in which OII ~H~ Il ~. ~bmll wkly for worko~ and following ~tling of oil ltrt~ until completion.
Date In''I (:ltl)Ih
al of 8:00 I.m.
10/17/90 (21)
TD:10653' ( 177)
SUPV:EB
10/18/90 (22)
TD:10758' ( 105)
SUPV:WH
10/~9/90 (23)
TD:10890' ( 132)
SUPV:WH
10/20/90 (24)
TD:11026' ( 136)
SUPV:WH
10/21/90 (25)
TD:11122' ( 96]
SUPV:WH
10/22/90 (26)
TD:11178' (
SUPV:WH
10/23/90 (27)
TD:11178' ( 0'
SUPV:WH
10/24/90 (28)
TD:11178' ( 0
SUPV:WH
S~U 33A-8
Complete record for each dly whill drilling or worKover in
GRAC]~ 154
DRILLING AHEAD MW:10.0 VIS: 44
DRILLING 10476'-10586',SHORT TRIP TO 7-5/8" CSG, NORMAL
DRILLING 10586'-10653'
DAILY:S22,253 CUM:$668,372 ETD:S668,372 EFC:$1,320,000
TEST BOP MW:10.0 VIS: 48
DRLG 10653 TO 10725, SHORT TRIP TO CASING, DRLG F/10725 TO
10758, CIRC SURVEY POOH & LD 15 JTS S135 & MWD, PULL WEAR
RING, TEST BOP
DAILY:S25,523 CUM:$693,895 ETD:S693,895 EFC:$1,320,000
DRLG MW:10.0 VIS: 44
RIG SERVICE, PU BHA, RIH, CUT DRLG LINE, FRIH, DRLG
F/10758'-10890'
DAILY:S31,428 CUM:$725,323 ETD:S725,323 EFC:$1,320,000
DRLG
DRLG, SHORT TRIP TO CASING, DRLG
MW:10.0 VIS: 43
DAILY:S22,070 CUM:$747,393 ETD:S747,393 EFC:$1,320,000
DRLG MW:10.0 VIS: 43
DRLG TO 11065', DROP SURVEY & DROP PILL, POOH, RETRIEVE
SURVEY, CHANGE BIT, SERVICE RIG, RIH, DRLG TO 11,122
DAILY:S30,721 CUM:$778,114 ETD:S778,114 EFC:$1,320,000
RIH MW:10.0 VIS: 43
DRLG TO 11178', SHORT TRIP TO WINDOW, CIRC, DROP SURVEY PUMP
PILL, POOH, RU DA, RUN SP,GR, DIL, TEM~,CNL, LOT,CAL, RD DA,
DAILY:S27,431 CUM:$805,545 ETD:S805,545 EFC:$1,320,000
CIRC MW:10.0 VIS: 44
FRIH, WASH TO BOTTOM 5' FILL, CBU, SHORT TRIP TO WINDOW,
CIRC & COND MUD, DROP RABBIT, POOH, RU & RUN 5-1/2" LINER,
PU LINER & HANGER, RIH, CIRC CAP LINER, RIH TO WINDOW
W/LINER, FILL 5 JTS, CBU @ 9919, FRIH, WASH 11151 TO 11177,
NO FILL, CIRC & BATCH MIX CMT
DAILY:S20,527 CUM:$826,072 ETD:S826,072 EFC:$1,320,000
CIRC MW:10.0 VIS: 45
CIRC & MIX BATCH CMT, CMT LINER W/74 BBLS CLASS G, BUMP PLUG
W/2500 PSI-FLOAT HELD, LD CMT HEAD, PULL 10 STDS, MIX & PUMP
PILL, POOH WELL FLOWING, MONITOR FLOW, SHUT WELL IN PRESS UP
TO 1000, BLEED OFF PRESS OPEN RAMS WELL FLOWING, FPOH LD
SETTING TOOL, RUN HWDP & MONELS IN HOLE, LD SHE, PU BIT RIH
TAG TOP OF CMT 9090, DRLG CMT 9090 TO 9631 TOP OF LINER,
088]Ti"a ETD: $900,088 EFC:$1,320,000
AR3B-459-2-8
INumber all daily well history' forms
as they are preparecl for each well, consecuhvely
Page no
ARCOOIIal( ,asCompany O
Dally Wall Hlstory--lnterin
Ini~tklne: Thil form il UNO during drilling or workovlr OpOr&tlons. If testing, coring, or i:)~rforeting, show formation nome in describing work OortormeCl.
NumOOr iii clrdl item tiltl 14quent/&lly. A~Ch ~OICril:)tloh Of ell COteS. WOrX IMrforn~d by Producing Socliofl will be reported On "lfltlrhl" InCite until fines
compllhon Re0on offlCill or reprelontlllVO tel~ on "Fle~" form. 1) Submit "Interim" IAfltl when filled out bul not Iiii frequently Ihln every 30 days. or (2)
on Wednel(~ey bi the week in which oil I~1tl~o Il Ill. Submit wflkly for workovlte Ifld following I~ttlng of Oii Itrlflg unlil coml311tloh.
District i¢ounty or PlrJtn iSfete
F~,ld ARCO ALASKA ~, I KENAI
JLeel~ or Unit
~ ADL: A-028996
Complete recorcl for each dly while drilling or workovlr in progrell
.~WANSON RIV£~
O/II end
&i of 800 e.m.
10/25/90 (29)
TD:ll178' (
SUPV:WH
10/26/90 (30)
TD:ll178' (
SUPV:WH
10/27/90 (31)
TD:11178' (
SUPV:WM
10/28/90 (32)
TD:11178' (
SUPV:WH
10/29/90 (33)
TD:11178
PB:11084
SUPV:WH
0)
0)
gRA~E 154
CLEAN OUT CELLAR MW:10.1 VIS: 42
FIN CIRC HOLE CLEAN, MONITOR WELL FOR FLOW, PRESSURE UP CSG TO
1000 PSI,HOLD, PUMP PILL, POOH, PU 2-7/8" DP AND 3-1/8" DC, RIH
DRLG CMT FROM 9631-9636,WASH F/ 9636-9706,FIN RIH TO LANDING
COLLAR AT l1086,CIRC BTMS UP,PRESSURE TEST CASING TO 1000
PSI,HOLD,CSG TESTED OK, PUMP PILL, POOM, PU RET. 'BRIDGE PLUG
RIH AND SET AT 9599,PULL 20 STANDS,SET STORM PACKER, CLEAN
OUT CELLAR.
DAILY:S23,388 CUM:$923,476 ETD:S923,476 EFC:$1,320,000
RIH W/BIT AND SCRAPER MW:10.1 VIS: 44
ND BOPE, SET OUT OLD TUBING SPOOL, PULL OLD PACKOFF, INSTALL
NEW PACKOFF AND TEST TO 2500 PSI,SET IN NEW TUBING SPOOL, NU
BOPE, TEST BOPE 250-3000 PSI RAMS,LINES AND VALVES 250-4500
PSI,RETRIEVE STORM PACKER, RIM 20 STANDS,RELEASE BRIDGE PLUG
CIRC, POOM AND LD BRIDGE PLUG, PU POLISHING MILL, CUT DRLG LINE
POLISH TOP OF LINER 9631-9639,POOH, LD POLISHING MILL, PU BIT
AND SCRAPER, RIH W/BIT AND SCRAPER
DAILY:S37,382 CUM:$960,858 ETD:S960,858 EFC:$1,320,000
RIM MW: 9.5 VIS: 0
FIN IN HOLE W/BIT AND SCRAPER TO 9630',CIRC.,PUMP PILL, POOH
PU TIW TIE BACK SLEEVE,TIGHT SPOT @ 8445',SET TIE BACK
PACKER(LINER TOP 9621'),TEST TO 1000#, PUMP PILL, POOH, PU
MILL AND 5-1/2" SCRAPER, RIH,CBU, PUMP 200 BBLS FRESH WATER,
FLUSH PUMPS AND MUD LINES,DISPLACE HOLE WITH 9.5 PPG NACL
TRIP TO TOP OF LINER WAIT FOR ANY SETTLING, RUN BACK TO
BOTTOM TO REVERSE CIRC.
DAILY:S32,101 CUM:$992,959 ETD:S992,959 EFC:$1,320,000
LOGGING MW: 9.5 VIS: 0
REVERSE OUT FILTERED BRINE WATER, CLEAN FILTERS,CONT REVERSE
OUT FILTERED BRINE POOH, RU ATLAS WIRELINE,RUNNING CASED HOLE
LOGS, RAN GR-CCL-CBLAND PDK-100, RUNNING GYRO NOW.
DAILY:S30,329 CUM:$1,023,288 ETD:S1,023,288 EFC:$1,320,000
RIH MW: 9.5 NaCl
RUN GYRO, CHANGE OUT HEADS TO RUN CASING INSPECTION LOG, RUN
LOG IN HOLE,TOOL FAILED, POOM,ATTEMPTTO REPAIR CASING
INSPECTION TOOL, COULD NOT, SENT iT INTO SHOP, RU LUBRICATOR
AND TEST TO 500 PSI,RIH W/PERF GUN, PERF 10938-10946',CH~NGE
OUT PERF GUNS, RIH,MISS FIRE, REPAIR GUN, RIH AND PERF
10914-10922',POOH,RD ATLAS PU MILL, RIH TO LD DP.
DAILY:S24,015 cUM:$1,047,303 ETD:S1,047,303 EFC:$1,320,000
AK
IWell
sgu 32~-8
The shove il ~,~;~¢t_
For form pr~'perl}tlot~encl cllltrtbu~o
~ Proce~ Min~l Section
D, fig, P~87
AR3B-459-2-B
I NumPer all claily well history forms consecutively
they are prepared rot eec~ well.
P3ge ne
il ~
ARCO O,1 ~': Gal Company
Dally Well History--Inter,
lelllll~lM~l: Thll form il ul~(I du/il'l~ ddlli~ Or tO~r o~rltionl. I~. tilting, coring, or~rforlling, Ih~w IOrmltlOn nlml in dtlCr~bin~ wo~ ~rformid
Numar Iii drill Itl~ lllll ~ntJ~ly. A~ ~ri~lon of III COrll work ~rfor~d by Producing Section will bi ~ld ~ "In/HI' thllll uti i fi~l
completion. RIPO~ offiClll or ~prl~tltl~ ~ ~ "F~" to~. 1) Submit '*lallrl~" Ihlltl Whl~ filll~ o~t but not IIII frlqul~lly then I~ ~ ~lyl. or (2
O~ WId~l~ly ol thl Wtlk i~ t~ic~ oil ~ il .I. ~mil tNkly for wO~O~ In~ foIIowmg ~ttmg of Od lit ~ until compllh~l
DIItrlct ICounty or Perlll~ I$11te
~eldARCO ALAS~(,% ~N~. I KENAI
I LIlll Or Unit
SWANSON RIVER I ADL: A-028996
O"ti Ind dlpth
II Of 8:00 I,m.
10/30/90 (34)
TD:11178
PB:11084
SUPV:WH
10/31/90 (35)
TD:11178
PB:l1084
SUPV:WH
11/01/90 (36)
TD:ll178
PB:11084
SUPV:EB
AK
SCI~ 33A-8
Complete record for each day while drilling or workover in ~rogrell
Gm%C~
RIH W/PACKER MW: 9.5 NaCl
FIN IN HOLE TO LD DP AND DC, CIRC.,PUMP PILL, BREAK KELLY AND
$UBS,LD 3-1/2" AND 2-7/8" DP,LD 3-1/8" AND 4-3/4" DC,ATTEMPT
TO RUN CASING INSPECTION LOG, TOOL FAILED,RUN JUNK BASKET AND
GAUGE RING TO 10,800',PU WLEG/PUP JT/XN NIPPLE/1 JT 2-7/8"
TBG/MILL OUT EXTENSION/BAKER F-1 PACKER, RIH ON WIRELINE
W/PACKER ASSY
DAILY:S19,236 CUM:$1,066,539 ETD:S1,066,539 EFC:$1,320,000
WAIT ON SLIDING SLEEVE MW: 9.5 NaCl
RUN BAKER MODEL F-1 PROD. PACKER, SET AT 10,739' WLM, RUN
2-7/8"X 3-1/2" PROD STRING, STOPPED AT 9629',POOH W/PROD
STRING, LD 1 JT 3-1/2" TBG AND GLM IN 2-7/8 STRING,WAIT ON
2-7/8" SLIDING SLEEVE
DAILY:S84,025 CUM:$1,150,564 ETD:S1,150,564 EFC:$1,320,000
NU TBG HD ADAPTER MW: 9.5 NaC1
WAIT ON OTIS SLIDING SLEEVE AND X NIPPLE,RIH(SLM)
W/PRODUCTION STRING, LOCATE PKR W/PUMP,SPACE OUT AND LAND TBG
WITH ANCHOR SEAL ASSY, LATCHED IN TO PACKER, RUN IN LOCK DOWN
SCREWS ON TBG HEAD AND PRESSURE TEST ANNULUS TO 1500 PSI
FOR 15 MIN.,RU SLICKLINE UNIT, RIH AND SET PLUG IN OTIS XN
NIPPLE AT 10,820'WLM, POOH, RiH AND SET PRONG IN PLUG, POOH
AND RD SLICKLINE UNIT,PRESSURE TEST TUBING TO 2500 PSI,LD
LANDING JOINT, RD TBG TONGS,CLEAR FLOOR, SET BPV IN TBG HANGER
REMOVE FLOOR PLATES/ROTARY AND ND BOPE AND 8" X 13-5/8" DBL
STUDDED ADAPTER
DAILY:S52,031 CUM:$1,202,595 ETD:S1,202,595 EFC:$1,320,000
The iI:)ov~ I1 correct
- '
For IO~ preplrltion~nd diltri~ut}on
~ Procid.~ MIn.~l Section
Drilling, PIgII~ 67
AR3B-459-2-B
I Number ell deily wall hiltOry forms consecutively
they ere prepared for each walt.
ARCO O~;'~.nd Gas Company
Dally Well History-Final Report
IIIlt~tlOal: Prepare end i~bmlt the "Flllll RIIHirt" on the flrlt Wldnaldly after allowable hll {)lan illignt~'l or well il Plugged. Ablndonld. or Sold.
"Final Reperl' Ihould be lubmitted &Ilo wllln operltlonl enl lUlplndld for In indefinite or epprlcllble length of time. On workovl~'l when In o~ciel tilt il not
rlquirld upon completion. ~,port co~ptetlo, nind mprlll~tlliVt tilt dltl In blOCkl providld. The "Fill I%~IT' form rely bi uled for reporting thl lntlrl
operltlOn if IplCl ii Ivlillbla.
District
ARCO ALASKA INC.
Field
SWANSON RIVER
Auth. or W.O. no.
AD6862
County or Plrilh
KENAI
Laele or Unit
ADL: A-028996
Title
DRILL & COMPLETE
IAccounting coat cantle' cOde
State
AK
I
well '~o
S(~U 33A-8
Operator
ARCO
Spudded or W.O. t)egun
IA.R.Co. W.I.
48.4864
Date
10/10/90
SPUD
Date end depth Complete record for each day reported
es of 8:00 a.m.
GRACE 154
Iotalnumber of wells (active or inactive) on this
dst center prior to plugging and I
bandonment of th~s well
I
our I Prior status if a w.o.
I
06:00
11/02/90 (37)
TD:11178
PB:11084
SUPV:EB
MOVING RIG TO $CU 24-5 MW: 9.5 NaC1
NU 9" 5M X 3-1/8" 5M DBL STUDDED ADAPTER FLANGE AND 3-1/8"
TREE, TEST PACKOFF/ FLANGE/TREE TO 5000 PSI,PULL TWO WAY
CHECK VALVE AND INSTALL BPV,CLEAN PITS, RELEASE RIG AT 1200
HOURS
DAILY:S100,755 CUM:$1,303,350 ETD:S1,303,350 EFC:$1,320,000
Old TD
Released rig
New TD I PB Depth
Date IKind of rig
IType completion (single, dual, etc.)
Official reservoir name(s)
Classifications (oil, gal, etc.)
Producing method
Potential lest data
The al)ova il~.~or,fc}
.,0.,..-, _..
' .o, ,o~ ~.;.,,~.....,,,;.,,o.,
~1 P~ce~el Man~l, Section 10,~
",,~,.'.s~a
as they a~ p~parod for each well.
AR3B~5~3-C
,,
Well no. Date IReaervolr Producing Interval OII or gasTest time Production
Oil on test Gas per day
,.
Pump laze, SPM X length Choke laze T,P. C.P. Water % IGOR Gravity Allowable Effective date
corrected
AOGCC GEOLOGICAL MATERIALS INVENTORY LIST
PERMIT ~ ?~ - / ? -- / WELL NAME ~-~ C (-~.
COMPLETION DATE ?/ ! ~- !,~ CO. CONTACT
33,~- R
check off or list data as it is received.*list received for 407, if not renuired list as NR
drillino history surve~ well tests core dcscri
COred int~rVa|s core analysis dry ditch intervals digital data
LOG TY,-- '~O'N INTERVALS scALE
................... NO. [to .the nearest foot} ,,, [inchll
. .
~i //~ ~ ~z~ ~ ...... / ~ ~ - ~o ~ ~ .
,
, , , ,, ,,, ,, , , , ,, ,,, ,, i,,,, ,,,, , , , ,,,
I I I Ill I Ill IIII IUll I Il I I IUll IU' 11 11 IIII I ~Ii iiii i i i i i ii ii ii ii]
_
...........................
1~I ,
......
~1 .....
......... ~ ......... ~ ,,, ~H ~
~1 .......... i' '
..................
...... ~ ....... j ........ ., ,
................
,,
ii ii ii i[11 iiiiii iii z_ ii ii i . iii ii iiiiiiJ
~1 L II I
ARCO Alaska, Ir("
Post Office c~ox 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4304
Tom Wellman
Regional Engineer
Cook Inlet Engineering
December 18, 1990
Mr. L. Smith
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Smith:
Attached is a subsequent report of operations for the perforating of
SCU 33-8 (ARCO SCU 33A-8).
SCU 33-8 was perforated in the H5 interval from 10,962' to 10,970'
MD on November 27, 1990.
The well tested approximately 100% gas and and is currently shut-
in.
Sincerely,
T. Wellman
Regional Engineer
TW:jkw:0011
Attachment
DEC 1 9
Alas_Ea,Oil &.Gas,Co~ .. ..... ,,~:~u~
~ , /~[llCNOrage
cc: Mr. A. R. Kukla
Mr. B. C. Dehn
Marathon Oil Company
UNOCAL Corporation
ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company
ARCO Alaska, Inc. .~"'~
Post Office Box~ .,~0360
Anchorage, Alaska 99510-0360
Telephone 907 263 4304
Tom Wellman
Regional Engineer
Cook Inlet Engineering
December 12, 1990
Mr. L. Smith
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Smith:
Attached is an Application for Sundry Approval to set a plug over the
H4 and H5 intervals and perforate the H2 interval in SCU 33-8
(ARCO SCU 33A-8).
We propose to perforate 6' of the H2 sand (10,864' - 10,870' MD)
using 2 1/8" strip perforating guns @ 4 spf.
With your approval, we would like to begin this work as soon as
possible. If you have any questions please contact Stacy L. Strickland
at 263-4914.
Sincerely,
T. Wellman
Regional Engineer
TW:j kw: O010
Attachment
cc: Mr. A. R. Kukla
Mr. B. C. Dehn
Marathon Oil Company
UNOCAL Corporation
Alaslia 0il & 6as Cons.
~Anchorage
ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company
STATE OF ALASKA .....
ALASKA OIL AND GAS ~RVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon _ Suspend_
Alter casing __ Repair well
Change approved program m
Operation Shutdown m Re-enter suspended well __
_ Plugging X Time extension _ Stimulate_
Pull tubing ~ Variance _ Perforate ~ Other
2. Name of Operator
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK
4. Location of well at surface
99510
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
1959' FNL, 1987' FEL, Sec.8, T7N, RSW, SB&M
At top of productive interval
2533' FSL, 1655' FEL, $ec.8, T7N, RSW, SB&M
At effective depth
2457' FSL, 1587' FEL, Sec.8, T7N, RSW, SB&M
At total depth
2430' FSL~ 1563' FEL~ Sec.8~ T7N~ RSWr SB&M
6. Datum elevation (DF or KB)
RKB -- 154'. GL = 128'
7. Unit or Property name
$oldotna Creek Unit
_ f~et
8. Well number
SCU 33-8 (ARCO SCU ;~.:3A-8)
9. Permit number
10. APl number
5o-133-20241-00
11. Field/Pool
Swanson River/Hemlock
12.
Present well condition summary
Total Depth: measured
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
true vertical
measured
true vertical
Length
58'
3332'
11,178'
10,935'
11,086'
10,849'
Size
1 8"
10 3/4"
9993' 7 5/8"
1547' 5 1/2"
measured
feet Plugs (measured) 10,894' - 10,906' (Proposed)
feet
feet Junk (measured)
feet
Cemented Measured depth True vertical depth
Driven 58' MD
2218 cu. ft. lead 3332' MD
& 150 sx Class G
743 sx Class G 9993' MD
74 bbls Class G 9631'-11178' MD
58' MD
3332' MD
9864' TVD
9631 '-10935'
TVD
10,914' - 10,930', 10,938'- 10,946', 10,962'- 10,970' MD;
true vertical
10,694' - 10,709', 10,716'- 10,723', 10,737'- 10,744' TVD;
Tubing (size, grade, and measured depth
3 1/2" @ 9375 MD; 2 7/8" from 9375'- 10,805' MD
Packers and SSSV (type and measured depth)
Baker Model F-1 @ 10~762' MD
13, Attachments Description summary of proposal
·
14. Estimated date for commencing operation
' December. 1990
16. If proposal was verbally approved
17.
Proposed'
Proposed:
Detailed operation program X
10,864' - 10,870' MD
10,648' - 10,653' TVD
15.
Name of approver Date approved I
I hereby certify that the foregoing is true and correct to the best of my knowledge.
StatUs of well classification as:
Oil ~ Gas . Suspended
DEC 1 9 1990
BOP sketch
,,
Signed '/'~~~ Title Cook Inlet Regional ErjQE
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so rePresentative may witness J~lilr;]lOra§l~Approval_No.
Plug integrity BOP Test _ Location clearance ~
Mechanical Integrity Test ~ Subsequent form require 10- '~' /'
Approved Copy
Returned~
Commissioner
,u
SUBMIT IN T~PLICATE
ORIGINAL SIGNED BY
LONNIE C. SMITH
Approved b)~ the oroer otthe Commission
Form 10-403 Rev 5/03/89
SCU 33A-8
Set Plug/ H2 Add Perfs Procedure
SR 209
Obiective:
-
To set a plug over the H4/H5 interval and add perforations in the H2 interval to
return the well to production.
Well Date.:
Completion:
Tie-in Log:
Minimum Restriction:
Capacities:
Pressure Data:
3-1/2" tbg to 9375' MD, 2-7/8" tbg to 10,805' MD
PDK 100 (10/28/90)
Otis 'XN' Nipple @ 10,800' MD (2.313" ID)
5-1/2" csg = 0.9314 gal/ft -- 0.0221 Bbl/ft;
3-1/2" tbg = .0087 Bbl/ft; 2-7/8" tbg = .00579 Bbl/ft
Tbg=3600psi; PC= 1000 psi; SC=Opsi
Recommended Procedure:
Prior to Job
,
RU pump truck. Bullhead 40 Bbls of lease water down tubing. Displace water with 50
Bbls of lease crude to provide a water environment for setting the through tubing bridge
plug and cement.
2. MIRU slickline unit. RIH with 2.2" gauge ring to ensure adequate clearance for through
tubing plug and perforating guns.
3. Assure that Sundry approval has been obtained prior to setting the plug and perforating.
Set plug~Dump bail cement
1. Hold safety meeting with all appropriate personnel.
2. MIRU conductor line. Pressure test lubricator to 4000 psi.'
3. RIH with CCL/plug. Tie-in using the PDK 100 log dated 10/28/90. (There is a
centralizer located at 10,625' MD.)
4. Set plug top at 10,904' MD. Note: Plug will take approximately one hour to set. POOH.
5. Batch mix sufficient quantity of expanding cement to provide a lO-foot cement plug on top
of the through tubing plug.
6. RIH with cement dump bailer and dumP cement on top of plug. POOH. Allow cement to cure
for at least 24 hours prior to pressure testing and perforating.
.
Pressure test plug to 2500 psi for one hour. If plug does not hold, contact Anchorage
Engineering before proceeding with perforating.
8. Bleed-off pressure.
RECEIVED
DEC 1 9 199~
A. laska.Oll & Gas Cons. C0mmissi0[~
~,nchorage
ARCO Alaska Inc. Is a subsidiary of Atlantic Richfield Company
AR3B-6OO1-A
Page Two
SCU 33A-8
Set Plug/ H2 Add Perfs Procedure
SR 209
Perforate H2 Interval
1. RIH with perf gun/CCL. Tie-in to perf interval'
PDK 100 (10/28/90) Footage Sand SPF
10,864-10,870' MD 6' MD H2 4
Hole
Company Gun Type Gun Size Depth
Schlumberger Enerjet Strip 2- 1/8" 1 0.25"
Atlas Silver Jet 2 - 1/8" 1 0.55"
Halliburton DynaStrip 2- 1/8" 1 0.39"
NOTE: Gun orientation should be 60° from hole bottom.
2. Open well to gauge tank. Perforate interval. Flow well for 5 minutes.
POOH.
3. Check gun to confirm that all shots have fired. RDMO.
4. Return well to production ASAP in the 900 psi system on current choke.
3, and 5.
Hole
Diameter
.36"
.39"
.51"
Shut-in well.
Test on days 1,
DEC ~ 9 ~99~
A~as~a.oij & Gas Cons. Commission
Anchorage
ARCO Alaska Inc. Is a subsidiary of Atlantic Richfield Company
AR3B-6001-A
~.[- SCU 33A-8
Spud Date' 3/73
Original RKB: 17
Top of Hemlock:10,810'
Arc~'~ ,laska Inc.- Swanson Riv['
APl#: 133-20241-01
Completion Date: 5/73
Hanger Type:
Max. Hole Angle: 27°
Field
Well Type: Producer
Last Workover: 10/90
Hanger:
Angle @Hemlock: 25°
All Depths are RKB MD to Top of Equipment.
Jewelry
I 3997'
2 4012'
3 9375'
4 9621'
5 10,690'
6 10,762'
7 1 0,800'
8 10,804'
Otis 3 1/2" 'X' Nipple
1-1/2' Macco GLM dummied
3 1/2' x 2 7/8' X-Over
Tie-back Packer
2-7~8' Sliding Sleeve
Baker Model F-1 5-1/2"x2-7/8" Packer
Otis 2-7~8" "XN" Nipple I.D. 2.313"
Baker Wireline Entry Guide
Casing and Tubing
Size Welqht ~ ~ Bottom
18' 94# 0 58'
10-3/4" 40.5# N80 0 3332'
7-5/8' 33.7# Mixed 0 9993'
5-1/2' 20# N80 9631' 11,178'
3-1/2' 9.3# L80 0 9375'
2-7~8" 6.5# N80 9375' 10,805'
Descrlotlon
Conductor Pipe
Sudace Casing
Production Casing
Liner
Tubing
Tubing
Perforation Data
10,914'-10,930' H4
10,938'-10,946' H5
FT SPF Date
1 6 4 10/90
8 4 10/90
Comments
PBTD -- 11,086'
TD= 11,178'
D~C ~ 9
& Gas Cons. C0mmissio~
Anchorage
Well scu 33A-8
JLB 11-19-90
E-Line BOPE's
Grease Head/
Hydraulic Packoff
Lubricator Extension
Manual Rams
Swab Valve
Double Master
Valves
Wellhead
R.?E~EIVED
D~"O~_ I 9 ']996
Alaska Oil & 6as Co,is. gommissio~]
Anchorage
ARCO Alaska, Inc.
~*r
Post Office B(~x ,00360
Anchorage, Alaska 99510-0360
Telephone 907 263 4304
Tom Wellman
Regional Engineer
Cook Inlet Engineering
December 12, 1990
Mr. L. C. Smith
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Mr. Smith:
Attached are Application's for Sundry ApProval requesting name
changes and new APl numbers for the following sidetracked wells as
discussed in phone conversations between C. M. Baker and L. C.
-Smith on 12/3/90:
Old New
SCU 4 lA-9
SCU 33-8
SCU 32A-9
SCU 4 lB-9
SCU 33A-8
SCU 32B-9
If you have any questions or need additional information, please
contact C. M. Baker at 263-4643.
Sincerely,
T. Wellman
Regional Engineer
TW:jkw: 0012
Attachment
RECEIVED
DEC 1 9 199~
AJaska Oil & Gas Cons, Commisslort
Anchorage
cc: Mr. A. R. Kukla /
Mr. B. C. Dehn '
Marathon Oil Company
UNOCAL Corporation
ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon _ Suspend_
Alter casing __ Repair well _ Plugging
Change approved program __ Pull tubing ~
2. Name of Operator ~ 5. Type of Well:
Development
Exploratory
Stratigraphic
Service
Operation Shutdown __ Re-enter suspended well __
Time extension _ Stimulate_ (Name
Variance _ Perforate _ Other .~X Ch.ange)
6. Datum elevation (DF or KB)
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK 99510
4. Location of well at surface
1959' FNL, 1987' FEL, Sec.8, T7N, R9W, SB&M
At top of productive interval
2533' FSL, 1655' FEL, Sec.8, T7N, R9W, SB&M
At effective depth
2457' FSL, 1587' FEL, Sec.8, T7N, R9W, SB&M
At total depth
2430' FSL~ 1563' FEL, Sec.8r T7N~ R9Wr SB&M
12. Present well condition summary
Total Depth: measured
Effective depth:
true vertical
measured
true vertical
Length
58'
3332'
11,178' feet Plugs (measured)
1 0,935' feet
11,086' feet Junk (measured)
1 0,849' feet
Size Cemented
I 8"
10 3/4"
9993' 7 5/8"
1 547' 5 1/2"
measured
Casing
Structural
Conductor
Surface
Intermediate
Production
Uner
Perforation depth:
RKB = 154', GL = 12{)' feet
7, Unit or Property name
Soldotna Creek Unit
8. Well number Proposed
SCU 33-8 Name: SCU 33A-8
9, Permit number
13.
14. Estimated date for commencing operation
10. APl number
5o-1 33-20241
11. Field/Pool
Swanson River/Hemlock
Measured depth True vertical depth
Driven 58' MD
2218 cu. ft. lead 3332' MD
& 150 sx Class G
743 sx Class G 9993' MD
74 bbls Class G 9631'-11178' MD
10,914' - 10,930', 10,938' - 10,946', 10,962 - 10,970' MD
true vertical
10,694' - 10,709', 10,716' - 10,723', 10,737' - 10,744' TVD
Tubing (size, grade, and measured depth
3 1/2" @ 9375 MD; 2 7/8" from 9375' - 10,805' MD
Packers and SSSV (type and measured depth)
Baker Model F-1 ~ 10r762' MD
Attachments Description summary of proposal _ Detailed operation program -..
58' MD
3332' M D
9864' TVD
9631'-10935'
TVD
RECEIV£D
DEC 1 9 1990
Alaska 011 & Gas Cons. C0mm'tss~on
Anchora,qe,
BOP sketch
15. Status of well classification as:
Oil X Gas.
16. If proposal was verbally approved
Name of approver Date approved Service __
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Suspended _
Sicjned --?-/,v~.,.__ Title Cook Inlet Regional Engr.
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test _ Location clearance __
Mechanical Integrity Test_
Approved by the order of the Commission
Form 10-403 Rev 5/03/89
Approved C.op¥
Returnecll
Subsequent form require 10-
ORIGINAL SIGNED BY
LONNIE C. SNIITt'l
Date
IApprov_al No~..,_
Commissioner
SUBMIT IN TRII~LICATE
'ol
-. ,,.ORIGINAL
.
REPORT OF SUNDRY WELL OPERATIONS
1. Type of Request: OpeFation Shutdown Stimulate Plugging Pepfo~ate
Pull tubing Alte~ casing __ Repaie well __ Pull tubing Othep
2. Name ot Operato~ 5. Type of Well: 6. Datum elevation (DF o~ KB)
Development
ARCO Alaska. Inc.
:3. Address
P. O. Box 100360, Anchorage, AK 99510
4. Location of well at surface
1959' FNL, 1987' FEL, Sec.8, TTN, Rgw,
At top of productive interval
2533' FSL, 1655' FEL, $ec.8, T7N, R9W, $B&M
At effective depth
2457' FSL, 1587' FEL, Sec.8, T7N, Rgw, SB&lvl
At total depth
2430' FSL~ 1563' FEL~ Sec.8~ T7N~ R9WI SB&M
12. Present well condition summary
Total Depth: measured 11,1 78'
true vertical 10,935'
Exploratory
Stratigraphic __
Service
/
RKB = 154'. GL = 128' feet
7. Unit or Property name
Soldotna Creek Unit
8. Well number
SCU 33-8 (ARCO SCU 33A-8)
9. Permit number/approval number
I O. APl number
so- 133-20241-0~
1 I. Field/Pool
Swanson River-Hemlock
feet Plugs (measured)
feet
Effective depth: measured 1 1,086' feet Junk (measured)
true vertical 10,849' feet
Casing Length Size Cemented
Structural
Conductor 58' 18" Driven
Surface 3332' 10-3/4" 2218 cu. ft. lead
Intermediate & 150 sx Class G
Production 9993' 7-5/8" 743 sx Class G
Liner 1547' 5- 1/2" 74 bblS Class G
Perforation depth: measured
13.
10,914 '-10,930', 10,938'-10,946', 10,962'-10,970' MD
true vertical
10,694'-10,709', 10,716'-10,723', 10,737'-10,744' TVD
Tubing (size, grade, and measured depth)
3-i/2"@ 9375' MD; 2-7/8" from 9375'-10,805' MD
Packers and SSSV (type and measured depth)
Baker Model F-1 @ 10~762' MD
Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
Measured depth True vertical depth
58' MD 58' MD
3332' MD 3332' MD
9993' MD 9864' TVD
9631'-11178'MD 9631'-10935'
TVD
N/A
ECEIVE,D
] 9 1990
Alaska Oil & Gas Cons, .CQ~sst,
Anchorag~l~ ,
14.
Representative Daily Average Production or I niection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
28 8500 0 1000
3600
Subsequent to operation
0 100% 0 0
3600
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations X Oil X Gas Suspended
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Service ,
Signed
Form 10-404 Rev 06/15/88
Title Cook Inlet Reqional Enqineer
SUBMIT IN DUPLICATE
"ARCO Alaska, Inc'
~1 ,
WELl.
CONTRACTOR
TEL
fi~BDT - - [~LL~ DISTRICT- STA¥~,,~
..... .,~_~j..~o,,_.,'~ ]"~.l V
OPERATION AT REPORT TIME
tWELL SERVICE REPOR'
- ,,' t DAYS IDAY~i ' '
.., 'Arm~ot~.go .,
i i , iii iii _
ii ii . ·
ilnlUl, il , Ill. l" . I ii ii i IIll
('~ CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK
~;;9.~ It'"'"' I c,,,,,..;= 'I'~"""""Y'" I w,.c~v.,." I~_'~. '
..... j IL _
,
. _
ARCO Alaska, In{ ',
Post office uox 100360
Anchorage, Alaska 99510-0360
Telephone 907 263 4304
Tom Wellman
Regional Engineer
Cook Inlet Engineering
November 19, 1990
R£¢EIVED
NOV 7 ]990
Mr. L. Smith/'~ A~a~.Ol~ & Gas Cons.
Alaska Off and Gas Conservation Commissioj~iC/I.'p..t~ ,~mlllisSillll
3001 Porcupine Drive '"
Anchorage, Alaska 99501
Dear Mr. Smith:
Attached is an Application for Sundry Approval to perforate the H5
interval in Well SCU 33A-8.
We propose to perforate 8' of the H5 sand (10,962' - 10,970' MD)
using 2 1/8" strip perforating guns @ 4 spf.
With your approval, we would like to begin this work as soon as
possible. If you have any questions please contact Stacy L. Strickland
at 263-4914.
Sincerely,
T. Wellman
Regional Engineer
TW:jkw:0006
Attachment
cc: Mr. A. R. Kukla
Mr. B. C. Dehn
Marathon Oil Company
UNOCAL Corporation
ARCO Alaska, Inc, is a Subsidiary of Atlantic Richfield Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION ~MISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon _ Suspend _
Alter casing _ Repair well
Change approved program _
Operation Shutdown _ Re-enter suspended well
_ Plugging _ Time extension _ Stimulate _
Pull tubing _ Variance Perforate X
5. Type of Well: ! 6. Datum elevation (DF or KB)
Development X
/
Exploratory _
Stratigraphic _
2. Name of Operator
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK 99510
4, Location of well at surface
1959' FNL, 1987' FEL, Sec.8, T7N, R9W, SB&M
At top of productive Interval
2533' FSL, 1655' FEL, Sec.8, T7N, R9W, SB&M
At effective depth
2457' FSL, 1587' FEL, Sec.8, T7N, R9W, SB&M
At total depth
2430' FSL~ 1563' FEL~ Sec.8~ T7Nr R9Wr SB&M
12. Present well condition summary
Other
Total Depth: measured 11,1 78'
true vertical 1 0,93 5'
Effective depth: measured 11,086'
true vertical 1 0,84 9'
feet Plugs (measured)
feet
feet Junk (measured)
feet
Casing Length Size
Structural
Conductor 5 8' 1 8"
Surface 3 3 3 2' 1 0 3/4"
Intermediate
Production 9 9 9 3' 7 5/8"
Uner 1 5 4 7' 5 1/2"
Perforation depth: measured
10,914' - 10,930'; 10,938' - 10,946' MD;
true vertical
10,694' - 10,709'; 10,716' - 10,723' TVD;
Tubing (size, grade, and measured depth
3 1/2" @ 9375 MD; 2 7/8" from 9375' - 10,805' MD
Proposed'
Proposed'
13.
RKB = 154'. GL = 128' feet
7. Unit or Property name
Soldotna Creek Unit
I8' wel' number //' c~.. ,%/ .... *~c~_.~
scu '""'
I 9. Permit ~mber '-¢''~)~'
I10.APl number -p,~
so-133-20241- ~-*'"~_,
11. Field/Pool
Swanson River/Hemlock
Packers and SSSV (type and measured depth)
Baker Model F-,1 ~ 10r762' MD
Attachments Description summary of proposal _
Cemented Measured depth True vertical depth
Driven 58' MD
2218 cu. ft. lead 3332' MD
& 150 sx Class G
743 sx Class G 9993' MD 9864' TVD
74 bbls Class G 9631'-11178' MD 9631'-10935'
TVD
MD
TvoRECEiVED
10,737' 10,744'
58' MD
3332' M D
NOV 2 7 1990
' ~laska 0.il & Gas Cons,
Detailed operation program ~ B~I;~
14. Estimated date for commencing operation
November. 1990 oi~ ~
16. If proposal was verbally approved
Name of approver Date approved Service _
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed '7'/,~g~,,~.~...- Title Cook Inlet Regional Engr.
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~
MeChanical Integrity Test
15. Status of well classification as:
Gas ~ Suspended _
BOP T~pl,ev~C(~[gp~clearance ~
__ -'-Ret~quent form require 10-/-~' ~f"
Approved by the order of the Commission
Form 10-403 Rev 5/03/89
ORIGINAL ~u~ ~",
LONNIE C. SMITH
Commissioner
Date
IApproval No.
SUBMIT IN 'I:RIPLIC~ATE
/ '' "
($CU 33A-8 ~..,*~-, .....
H5 Add Pe~ Proced~e
SR ~
Objective:
To add perforations in the H5 interval and increase well
production.
Well Data:
Completion'
Tie-in Log:
Minimum Restriction'
Tubular Capacities'
Pressure Data:
3-1/2" tbg to 9375' MD, 2-7/8" tbg to 10,805' MD
PDK 100 (10/28/90)
Otis 'XN' Nipple @ 10,800' MD (2.313" ID)
3-1/2" tbg = .0087 Bbl/ft; 2-7/8" tbg = .00579 Bbl/ft
Tbg= 3600 psi; PC = 1000psi; SC = 0psi
Procedure:
Note' · Make a 2.2" gauge ring run to 11,000' MD to assure that there is
adequate clearance for perf guns prior to RU conductor line.
· Assure that Sundry approval has been obtained prior to
perforating.
1. Hold safety meeting with all appropriate personnel.
2. MIRU pump truck. Bullhead 20 Bbls lease crude down tubing so that
liquid will cover the perf guns. (Run packer calculations, as necessary.)
3. MIRU conductor line. Pressure test lubricator to 4000 psi.
4. RIH with perf gun/CCL. Tie-in to perf interval:
PDK 100 (10/28/90)
10,962-10,970' MD
Footage .Sand .SPF
8' MD H5 4
Hole Hole
Company Gun _Type Gun Size Depth Diameter
Schlumberger Enerjet Strip 2-1/8" 10.25" .36"
Atlas Silver Jet 2-1/8" 10.55" .39"
Halliburton DynaStrip 2-1 /8" 10.39" .51"
NOTE: Gun orientation should be down (at hole bottom).
5. Perforate interval. POOH.
6. Check gun to confirm that all shots have fired. RDMO.
7. Return well to production ASAP in the 900 psi system on current
choke. Test on days 1, 3, and 5.
ARCO Alaska Inc. Is a subsidiary of Atlantic Richfield Company
AR3B-6001-A
Well- sou 33A-8
Spud Date' 3/73
Original RKB: 17
Top of Hemlock:10,810'
'~ Alaska Inc.-Swanson R}' ~r Field
APl#: 133-20241-01 ~ Well Type' Producer
Completion Date' 5/73 Last Workover: 10/90
Hanger Type' Hanger'
Max. Hole Angle: 27° Angle @Hemlock' 25°
All Depths are RKB MD to Top of Equipment.
Jewelry
I 3997'
2 4012'
3 9375'
4 9621'
5 10,690'
6 10,762'
7 1 0,800'
8 10,804'
Otis 3 1/2" "X" Nipple
1-1/2" Macco GLM dummied
3 1/2" x 2 7/8" X-Over
Tie-back Packer
2-7/8" Sliding Sleeve
Baker Model F-1 5-1/2"x2-7/8" Packer
Offs 2-7/8" "XN" Nipple I.D. 2.313"
Baker Wireline Entry Guide
Casing and Tubing
Size ~f.P,J.g.bt Grade
18" 94# 0 58'
10-3/4" 40.5# N80 0 3332'
7-5/8" 33.7# Mixed 0 9993"
5-1/2" 20# N80 9631' 11,1 78'
3-1/2" 9.3# L80 0 9375'
2-7/8" 6.5# N80 9375' 10,805'
Descrl_Dtion
Conductor Pipe
Sudace Casing
Production Casing
Liner
Tubing
Tubing
Perforation Data
Interval Zone FT SPF Date
10,914'-10,930' H4 16 4 10/90
10,938'-10,946' H5 8 4 10/90
Comments
PBTD = 11,086'
TD= 11,178'
Well SCU 33A-8
JLB 11-19-90
E-Line BOPE's
Grease Head/
Hydraulic Packoff
Lubricator Extension
Manual Rams
Swab Valve
Double Master
Valves
,,. Wellhead
ARCO ALASKA INC.
Cook Inlet/New Ventures Engineering
g465
TRANSMISSION
TO:. Commissioner
COMPANY: AOCK2C
DATE: 10/29/90
FROM: Scott Jepsen
'COMPANY: ARCO Alaska, Inc
WELL NAME: Listed below
Transmitted herewith are the following
,5~ee. 73a po.0z c¢ 61£ :: ~ 23Pw~ Blue Sepia Sepia rape&
Line Folded Rolled Mylar listing
SCU 33-8 1
SCU 13-9 Dual Burst 'IDT Log(TDTP) 1 1
Receipt Acknowledgement:
Date:
Return reciept to ARCO ALASKA, Inc.
ATrN: Judy Boegler ATO 1390A
Post Office Box 100360
Anchorage, AK 99510-0360'
RECEIVED
OCT 3 I 1990
Alaska Oil & ~as Cons. Commission
Anchorage
TELECOPY ~
(907) 276-7542
A W McBride
ARCO
ATO 1448
P~e ~
SCU 33-8
API No. 50-133-20241'"
Permit No. 72-17
Dear Mr. McBride
The enclosed sundry.application i's being returned to you because
the API number is invalid. Apparently, Arco took it upon itself
to assign the API number, which reflects an operation to redrill
the well. Our records indicate that no application for a permit
to redrtll this well has been filed with our agency.
Please be advised that AOGCC is t'he appropriate entity for
assigning API numbers, not ARCOI ~ In the future, we expect ARCO
to use only validAPI numbers, we'll names, and permit numbers in
its correspondence with AOGCC. Your attention to this matter
will help ensure timely processing of permit applications and
sundry notices.
If you have any questions, please contact Larry Grant or Robert
Crandall at 279-1433..
David W. JohnStd~:~
Commissioner~,,~ ,,~ ~.
,
cc~ Carol Baker
Steve Edwards
B2.924
STATE OF ALASKA '!.
ALASKA OIL AND GAS CONSERVATION COMMISsiON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon
2. Name of Operator
ARCO Alaska. Inc.
_ Suspend _ Operation Shutdown _ Re-enter suspended well _
Alter casing _ Repair well _ Plugging _ Time extension _ Stimulate _
Change approved program_ Pull tubing _ Variance _ Perforate ~ Other .X Si.detrack
3. Address
P. O. Box 100360, Anchorage, AK 99510
5. Type of Well:
Development X
Exploratory _
Stratigraphic _
Service
4. Location of well at surface
At top of productive interval
2831' FNL, 1701' FEL, Sec, 8, T7N, Rgw, SM
At effe~ive depth S ~p ~
2436' EEL, 1850' FEE, Sec, 8, m7N, R9W,,~U 4
7990
At total depth ~aska Oil&G~..
Cons.
2946' FNL, 1664' FEL, Sec. 8, T7N, R9W, SM '
12. Present well condition summary .... w~u[a~
Total Depth: measured 11,100' feet Plugs (measured)
true vertical 10,387' feet
Effective depth: measured 1 0,130' feet Junk (measured)
true vertical 9,980' feet
6. Datum elevation (DF or KB)
RKB 154.' GL 125'
7. Unit or Property name
Soldotna Creek Unit
8. Well number
$CU :~3-8 (ARCO sCU 33A-8]
9. Permit number
72-17
feet
10. APl number
50-133-20241 '"~0~
11. Field/Pool Swanson River Field
Hemlock Oil Pool
SCU 33-8 P&A with 120 sx Class G
@ 10,130'.
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size
58' 18"
3332' 1 0-3/4"
1 0,672' 7-5/8"
640' 5- 1/2"
measured
None open to production
true vertical
None open to production
Tubing (size, grade, and measured depth)
None
Cemented Measured depth True vertical depth
Driven 58' md 58' tvd
2218 ft3 .lead 3332' md 3332' tvd
& 150 sx Class G
743 sx Class G 10,672' md 10,470' tvd
93 sx Class G 10,460'-11,100' md 10,837' tvd
33-8 has been P&A @10,130'.
33A-8 will be sidetracked from 33-8 with minimum
departure from the original BHL.
Packers and SSSV (type and measured depth)
None
Attachments Description summary of proposal ..~
Detailed operation program_
BOP sketch X
14. Estimated date for commencing operation
Seotember 27. 1990
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil X... Gas _ Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed~,/.~ ,'j~'~,l.~ .~..~~ ~itle Area Drilling Engineer Date
13 - - ' ~ COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity m BOP Test_ Location clearance__
Mechanical Integrity Test_ Subsequent form require 10-~...~~'
I! A P P r ° v~N~° ?..~-~.
~,pproved by the order of the Commission
Form 10-403 Rev 06/15/88 i3P, tl~tNAL S~GI~.!3 ~
LONI~IE C. ,~
Commissioner
Approved Copy
Retqrned
Date
SUBMIT IN TRIPLICATE
,~CU 33-8 General Procedure
1. Move in rig and rig up.
.
Ensure well is dead, ND tree, NU BOPE, and test same. Build hi-
vis mud system suitable for section milling.
3,
PU 3-1/2" drill pipe and GIH w/ 6-1/2" bit and 7-5/8" 33.7//
casing scraper to PBD = +/- 10,331'. Test casing to 3,000 psi.
Displace casing w/ hi-vis mud system suitable for section
milling and POH.
,
GIH w/ Tri-State Metal Muncher section mill for 7-5/8" 33.7#
casing.
5. Cut 60' section f/ +/- 9,900'- 9,960'. POH.
1
GIH open ended and spot cement plug f/ PBD = 10,331'-
9,850'. PU above TOC and squeeze +/- 3 bbls cmt into
formation if possible. Open preventers and POH.
.
GIH w/ 6-1/2" bit and dress off kick-off plug to 10' below top
of casing section. POH.
ge
Side track well out of section with minimum displacement to
the Northeast from the current bottom hole location keeping
angle as low as practical. Redrill well to +/- 11,100' TVD.
.
Log open hole and make any additional necessary rat hole on
the conditioning trip prior to running casing.
10. Run 5-1/2" production liner and cement same.
11. Clean out to TOL and test same to 3,000 psi.
12. Clean out inside of liner and retest to 3,000 psi.
11.
12.
Run cased hole logs
Perforate w/TCP. POH and LD drill pipe.
13.
14.
15.
16.
Run completion assembly.
ND BOP's, NU tree, and test same.
RD and MO rig.
Displace to lease crude and turn well over to Production
Supervisor.
Coos.
~lt~Chorago Corntni~ion
SCU 33A-8
5.1/2" Liner Desien Factors
_
Casing
5-1/2", 20#/ft, N80, FL4S, R3
Collapse (psi) 8,83 0
Burst (psi) 9,190
Pipe Body Yield (M lb) 4 66
Joint Strength (M lb)
Make up Torque
Tube I.D.
Joint I.D.
Drift I.D.
303.2
5,000
4.778
4.703
4.653
(minimum parting load)
Capacity (BPF)
(ft3/ft)
0.0221
0.1245
Setting Depths (ft)
Total Footage (ft)
9,608' to 11,088' MD
(9,515' to 10,850' TD)
1,480
TENSION (Air Wt.)
.loint Strength
String Weight
Pioe Bodv Yield
-- v
String Weight
= 303,200/(1,480)(20.0) = 1 0.2
= 466,000/(1,480)(20.0) = ~[ 5.7
COLLAPSE (Void Csg.) 1. Assume 12 ppg mud weight maximum
2. Annulus full of mud
Collaose
--
Annular Pressure
= 8,830/(10,850)(12.0)(.052) = 1.3 O
Collapse (TOL) = 8,830/(9,515)(12.0)(.052) = 1.4 9
Annular Pressure
BURST (Top and Bottom)
Ton Burst
1. Worst case during production
2. Backup gradient of 8.9 ppg
3. BHP - 5,000 psi @ TVD w/gas column to surface
4. Tubing leak at surface.
5. Oil packer fluid = 7 ppg
6. Gas gravity = 0.65
SITP = BHP * 1/e (¥ * TVD · 0.0000347)
where:
B HP = Bottom hole pressure
¥ - Gas gravity
TVD = Total vertical depth
SITP = (5,000)(1/e(0'65x10,850x0'0000347)) = 3,915 psi
Top Burst =
Burst Rating + Backup
SITP + Packer Fluid
9.190 + (8.9)(.052)(9.515)
3915 + (7.0)(.052)(9,515)
= 1.84
Bottom Burst 1. Worst case during treating or frac-away
2. Max' treating pressure = 5,000 psi
3. Fluid weight = 8.9 ppg
4. Backup gradient = 8.9 ppg
Bottom Burst =
Burst Rating + Backu0
Surface Pressure + Fluid Gradient
9.190 + (8.9~(.052)(10.850) = 1.42
5,000 + (8.9)(.052)(10,850)
SCU
33A-8
i~,
Liner
Schematic
18"@ 58'
10-3/4" @ 3,332'
Top of SCU 33A-8 5-1/2" Liner @ +/-9,600'
7-5/8" Window milled @ +/- 9,900'-9,960'
Kick off Cement Plug @ +/-9,890'
7-5/8" Cement Retainer @ 10,331'
Top of SCU 33-8 5-1/2" Liner @ 10,460'
SCU 33-8 7-5/8" Window @ +/-10,672'
SCU 33-8
Abandoned
Wellbore
PBTD @ 11,010'
TD @ 11,100'
Note: All depths are corrected to RKB=154', G.L.=128',RKB-G.L.=26' (Original RKB-G.L.=15')
SCU
33A-8
Proposed
Completion
Schematic
10-1
11
12
14
15
18" @ 58'
10-3/4" @ 3332'
Top of 5-1/2" Liner @ 9,600'
7-5/8" Window cut @ 9,900'
H Sands @ +/-10,400' - 10,700'
PBTD @ 11,010'
TD @ 11,100'
COMPLETION DETAIL
.
3.
4.
5.
6.
.
,
10.
11.
12.
13.
14.
15.
16.
17.
130 JTS 3-1/2",9.3#,N80, EUE
8RD MOD,R2 TUBING
OTIS X NIPPLE
PUP,3-1/2" X 6'
GLM,3-1/2" X 1"
PUP,3-1/2" X 6'
182 JTS 3-1/2",6.5#,N80,EUE
8RD MOD,R2 TUBING
X-OVER,3-1/2" X 2-7/8"
28 JTS 2-7/8",6.5#,N80,EUE
8RD MOD,R2 TUBING
PUP,2-7/8" X 6'
GLM,2-7/8" X 1"
PUP,2-7/8" X 6'
2 JTS 2-7/8",6.5#,N80,EUE 8RD
MOD,R2 TUBING
BAKER MOD. F-1 PACKER
1 JT 2-7/8",6.5#,N80,EUE 8RD
MOD,R2 TUBING
OTIS XN NIPPLE
1 JT 2-7/8",6.5#,N80,EUE 8RD
MOD,R2 TUBING
Note: All depths are corrected to RKB=154', G.L.=128', RKB-G.L.=26' (Original RKB-G.L.=15')
1:3-5/8 !"" 000 BOP ST i""K DIAGRAM
ACCUMULATOR CAPACITy TI~ST
I '1
REYENTER~
PIPE RAH
BLI ND RAHS
DRILLING
SPOOL
PIPE RAMS
TBO
SPOOL
1. CHECK AND Flu-ACCUMULATOR RESERVOIR TO PROPER LEVEL
WITH HYDRAULIC FLUID.
2. ASSURE THAT ACCUMULATOR PRESSURE IS 3500 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. ~RVE TIME. THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER AU. UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER MMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
PRESSURE.
BOP STACK TEST
1. FILL BOP STACK AND MANIFOLD WITH WATER.
CHECK THAT AU- I-tCXJ~DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
IN WELLHEAD. RUN LOCK-DOWN SCREWS IN HEAD.
:3. OPEN CASINO VALVE(S) ON TUBING HEAD. (MONITOR CASING VALVE
FOR FLOW THRCXJGH OUT BOP STACK TEST).
4. CLOSE ANNULAR PREVENTER AND TEST TO 250 AND 3,500 PSI FOR
10 MINUTES. BLEED TO ZERO.
5. OPEN ANNULAR AND CLOSE TOP PIPE RAMS. TEST TOP PIPE RAMS,
CHOKE MANIFOLD VALVES, AND STACK VALVES TO 250 AND 5,000
PSI FOR 10 MINUTES. BLEED TO ZERO PSI.
6. OPEN TOP PIPE RAMS AND CLOSE BOTrOM PIPE RAMS. TEST TO
250 AND 5,000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI.
7. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PUl/. OUT OF HOLE.
CLOSE BLIND RAMS AND TEST TO 250 AND 5,000 PSi FOR 10
MINUTES. BLEED TO ZERO PSi. OPEN PIPE RAMS.
8. CLOSE CASING VALVE(S) AND RECOVER TEST PLUG. MAKE SURE
MANIFOLD AND UNES ARE FULL OF A NON-FREEZING UOUID AND ALL
VALVES ARE SET iN THE DRlU. ING POSITION.
9. TEST STANDPIPE VALVES TO 250 AND 5,000 PSI.
10. TEST KELLY COCKS AND INSIOE BOP TO 250 AND 5,000 PSI.
11. RECORD TEST INFORMAT~ ON ~ PREVENTER TEST FORM.
SIGN AND SEND TO DRILLING SUPERVISOR.
12. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY
OPERATE BOPE DAILY. FUNCTION TEST BUND RAMS EACH TIME OUT
OFTHE ~
ALL BOP EQUIPMENT
5000 PSI RATED
C:MOK~ KI~%FOLD XH 8XZDDgD Z~OU~g
TO I)%TS/(3AB BUSTBIt
(%)'
(2)
(3)
(4)
(S)
20,000t LXHB. FBCI(BOPl
10,O00! ~ROSI
4" 10,000! VP, Z,VB8
3' 10,O00! VALVBI
10~000! H~DRAULZ¢ CHOEB8
3' S00O! VALVR8
3' x SO00! ~iK)8I
3' x S000! LX#II
4" x $000J LXHBI
Grace 154
Drilling Fluids System
Ii
I.. I
! --'- I Ill
31
6 5
18
19
PRO, OS ED REDRILL
SCU-55A-8
17
2O
--i--
34
I0
,~w on$on
CERTIFICATE OF SURVEYOR
hereby certify that lam properly registered
and licensed to practice land surveying in the State
of Alaska and that this plot represents a proposed
drilling location. Dimensions and other details
furnished by Arco Alaska Inc.
Date Surveyor
15
T8N
T7N
PROPOSED REDRILL
SCU - 35 A- 8
Located in
Sec. 8~T.?N.IR.gw.t S.M.1AIosko
for
ARCO ALASKA INC.
P.O. BOX 100360 ANCHORAGE, AK. 99510-0360
R.C. DAVIS 8~ ASSOC.
LAND 8~ MINERAL SURVEYORS
14870 SNOWSHOE LANE ANCH.,AK. 99516
I
SCALE: I"= I
ARCO Alaska, ~'",
Post office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
May 4, 1990 ,
Mr. Daniel Doshier
U.S. Fish and Wildlife Services
Kenai National Wildlife Refuge
P. O. Box 2139
Soldotna, Alaska 99669'
Dear Mr. Doshi'er:
Subject: Swanson River Redrill/Workover Activities
As'mentioned in my previous letter, ARCO Alaska,Inc. (AAI) plans to
perform a redrill of three wells (SCU 32B-9, SCU 33-8, and SRU 21-
34, and a workover on one well - SCU 13-9. This wOrk is planned to
commence about May 28, 1990. 'All activities will be done from existing
well pads. The final Plan of Operations and a copy of the "Coastal
Project Questionnaire" are provided for your review and authorization
of the proposed work.
If you have any questions Or need additional information about these
operations, please contact me at 265-1501.
Sincerely,
Permit Coordinator
LLB:es
LLB/04/031
I E6EIVEi.,
enclosure' Plan of Operations
CZM Questionnaire~
cc w/o enclosures: J. Dygas, BLM, Anchorage
Kenai Borough, Soldotna
L. Leatherberry, ADEC, Soldotna
P. Miller, DGC, Anchorage
'~ L. Smith,"AOGCC, Anchorage
ARCO Alaska. Inc. Is a Subsidiary of AllanllcRIchfleldCompany ,~rv~n cfyv~ r,
ARCO Alaska.' .~, .....
Post Ot,,,.! ,x 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
May 1, 1990
Mr. Lester Leatherberry
Alaska Department of Environmental
Conservation
Kenai District Office
P.O. Box 1207
Soldotna, Alaska 99669
Dear Mr. Leatherberry:
EHG ASST I
,s?, ~, Ec,~i%~p
FILE I .I
Subject: Swanson River Redrill/Workover Activities
ARCO Alaska, Inc. (AAI) plans to perform a redrill of three wells and
workover on one at Swanson River Field beginning abOut May 28, 1990.
All work will be done from existing pads. A copy of the "Coastal
Project Questionnaire" and Plan of Operations are~ provided for your
information.
If you have any questions, I can be reached at 265-1501.
Sincerely,
Permit Coordinator
LLB:es
LLB/04/032
Enclosure-
Plan of Operations
CZM Questionnaire
cc w/o enclosures' J. Dygasl B LM, Anchorage
Kenai Borough, Soldoma
P. Miller, DGC, Anchorage
L. Smith, AOGCC, Anchorage
- B. Wright, DNR, Anchorage
RECEIVE£,
Alaska 0il & Gas Cons. Commission
Anchorago
ARCO Alaska. Inc. is a Subsidiary o! AtlanlicRIchfieldCompany
AR3B-6003-C
ARCO Alaska,'.'.-' ~
Post O'th,~e Box 100360
Anchorage. Alaska 99510-0360
Telephone 907 276 1215
May 1, 1990
Mr. Bill Wright
Department of Natural Resources
Land and Water Management
P.O. Box 107-005
Anchorage, Alaska 99510-7005
Dear Mr. Wright:
ARCO Alaska, Inc. (AAI) is planning redrill operations on three wells in the
Swanson River Field and a workover on SCU 13-9 starting about May 28, 1990.
The wells involved are SCU 32B-9, SCU 33-8, and SRU 21-34. As part of this
activity, we plan to utilize groundwater from nearby water wells, which have been
drilled previously.
The drilling and testing activities .on each well' will last less than one month and we
anticipate the daily water use to be approximately 10,000 gallons per day for each
well. In anticipation of these and future redrill activities at Swanson River this
summer,we request that by this application a temporary water use permit be issued
for each of these wells. To minimize the administrative workload on AAI and the
Division of Land and Water Management, it would be preferred that AAI be issued a
permit that would allow temporary use of any installed water well within the field for
ade,.tuat,,,z .......the
a period of one year. We feel the single permit would ,, ,,I,, ~,4,4 ....
anticipated activities in the field. Periodic reports would be provided to ensure that
the State, and Fish and Wildlife Service records are complete.. AAI would, however,
continue to obtain USF&WS and BLM authorizations for field operations as needed.
I have attached the Plan of Operations that applies to the planned activities and the
required check for $100.00.
If you have any questions or need additional information about these drilling
operations, please contact me at 265-1501. I hope to hear from you at your earliest
convenience dUe to the short-time frame before the work is planned to begin.
Sincerely,
Permit Coordinator
LLB:es
LLB/04/28
enclosures:
Plan of Operations
CZM Questionnaire
cc w/o enclosures:
D. Doshier, USF&WS, Soldotna
J. Dygas, BLM, Anchorage
H. Friedman, ADEC, Anchorage
Kenai Borough, Soldotna
L. Leatherberry, ADEC, Soldoma
P. Miller, DGC Anchorage
L.' Smith, AOGCC, Anchorage
ARCO Alaska. Inc. is a Subsidiary of AtlanlicRlchlieldCompany
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
May 1, 1990
Mr. Henry Friedman
Alaska Department of Environmental
Conservation
3601 C Street, Suite 1350
Anchorage, Alaska 99503
Dear Mr. Friedman:
ARCO Alaska, Inc. (AAI) plans to perform a redrill of three wells (SCU 32B-9,
SCU 33-8, SRU 21-34), and a workover on SCU 13-9 in order to improve oil
production. The drilling activities will begin about May 28, 1990. All work will be
done from the existing well pads. The Plan of Operations for these activities is
attached for your information.
The drilling waste to be generated will consist of used mud and formation cuttings,
which will be confined to a metal "cuttings box", for transport to the Swanson River
Field Central Disposal Facility that is a lined permitted facility for the disposal of this
type of drilling waste. All pumpable liquids generated during the drilling and testing
of the ::,el! ,:.,il! be injected into disposal well SCU 43-4. It is estimated that
approximately 3000 barrels of drilling waste fluid will be injected.in this manner.
If you have any questions concerning this waste disposal notice, please do not
hesitate to call me at 265-1501.
Sincerely,
Permit Coordinator
LLB:es
LLB/04/029
enclosure:
Plan of Operations
CZM Questionnaire
cc w/o enclosures:
D. Doshier, USF&WS, Soldotna
J. Dygas, BLM, Anchorage
Kenai Borough, Soldotna
L. Leatherberry, ADEC, Soldotna
P. Miller, DGC, Anchorage
L. Smith, AOGCC, Anchorage
B. Wright, DNR, Anchorage
RECEIVED
o 7 lggo
/tlaska.oii.& Gas Cons. Commission
~nch0ra~
ARCO Alaska, Inc. is a Subsidiary of AllanlicRIchfleldCompany AR3B-6003-C;
ARCO Alaska,..
~..?
July 18, 1989
Mr. Bill Wdght
Department of Natural Resources
Land and Water Management
P.O. Box 107001
Anchorage, AK 99510-7001
Dear Mr. Wright:
ARCO Alaska Inc. (AAI) is planning redrill operations on two oil wells in the Swanson
River Field commencing about the 10th of August, 1989. The wells involved are
SCU 41B-9 and SCU 43B-8. As part of this activity, we plan to utilize groundwater
from nearby water wells which were drilled prior to 1970.
The drilling and testing activities on each well will last less than one month and we
anticipate the daily water use to be apprcximately 10,000 gallons per day for each
well.. In anticipation of these and future workover operations, AAI is by this
application requesting a temporary water use permit for each of these wells from
Land and Water Management. To minimize the administrative burden on AAI and
the Division of Land and Water Management, it is preferred that AAI be issued a
permit that would allow temporary use of any installed water well within the field for a
period of at least one year. We feel that one permit would address the multiple
anticipated activities in the field. Periodic reports would be provided to ensure that
the State and US Fish and Wildlife Service records are complete. We would,
however, continue to obtain USF&WS and BLM authorizations for field operations
as needed.
I have attached for your information the Plan of Operations that applies to the two
subject wells and the required checks for $50.00.
If you have any questions or need additional information about these drilling
operations, please call me at 263-4675. I hope to hear from you at your earliest
convenience due to the short time frame before the work is planned to begin.
Sincerely,
Marcia P. I~latthieu
Cook Inlet Permits Coordinator.
MPM:es
MPM/07/011
MPM:es
MPM/07/011
Enclosures:
Plan of Operations
CZM Questionnaire
cc w/o enclosures:
P. Bielawski, DGC, Anchorage
J. Dygas, BLM, Anchorage
H. Friedman, ADEC, Anchorage
J. Gabler, KPB, Soldotna
L. Leatherberry, ADEC, Soldotna
B. Richey, USFWS, Soldotna
L. Smith, AOGCC, Anchorage
ARCO Alaska, I, ~'? ~.':" ~;':,.''. · ''~
' ~; Office .
· ' -or..'~c:,~.
...,,.~(~.~ .,7 . '.~ ' ' "
July 18, 1989
Mr. Henry Friedman
AK Dept. of Environmental Conservation
3601 "C" Street, Suite 1350
Anchorage, Alaska 99503
Dear Mr. Freidman:
ARCO Alaska, Inc. plans to perform a redrill of two wells, SCU 4 lB-9 and
SCU 43B-8, at Swanson River Field in order to improve oil production. The
drilling will begin on or about August 1, 1989. All the work will be done
from the existing well pads. The Plan of Operations for these redrills is
attached for your information.
The drilling waste to be generated will consist of used mud and formation
cuttings which will be confined to a metal "cuttings box" for transport to the
Swanson River Field Central Disposal Facility,.which is a lined, permitted
facility for the disposal of this type of drilling waste. All pumpable liquids
generated during the drilling and testing of the well will be injected into
disposal well SCU 43-4. It is estimated that approximately 3000 barrels of
drilling waste fluid will be injected in this manner.
Our evaluation of the planned activities indicates that this is not storage and
therefore, permits are not required. We request, however, that ADEC review
and provide written concurrence with the plan outlined above.
If you have any questions, pleaSe do not hesitate to call me at 263-4675.
Sincerely,
Marcia P. Matthieu
Cook Inlet'Permits Coordinator
MPM:es
MPM/07/010
Enclosures:
Plan of Operations
CZM Questionnaire
cc w/o enclosures:
P. Bielawski, DGC, Anchorage
J. Dygas, BLM, Anchorage
J. Gabler, KPB, Soldotna
L. Leatherberry, ADEC, Soldotna
B. Richey, USFWS, Soldotna
L. Smith, AOGCC, Anchorage
B. Wright, DNR, Anchorage
'.RCO ,Maska, !nc. is a Subsiaiary RI AtlanlicRicl~lielrlC'ampany :.F ~t.~ '.'-L.,; ~ ,'
luly 18, 1989
Ms. Patty Bielawski
AK Dept. of Governmental Coordination
Office of Management and Budget
2600 Denali, Suite 700
Anchorage, AK 99503
Dear Ms. Bielawski:
A
ARCO Alaska, Inc. plans to perform a redrill of two wells - SCU 41,1~-9 and
SCU 4,3fl~ at Swanson River Field in order to improve oil production. The
drillingq's planned to begin on or about August 1, 1989. All the work will be
done from the existing well pads. The Plan of Operations for the red_rills is
attached as well as the "Coastal Project Questionnaire."
We have applied for permits as follows: BLM: Permit to Drill, and Land &
Water Management: Temporary Water Use. Copies of these applications are
attached for your information. Our contact for the BLM permit is Joe Dygas,
and for the Water Use permit is Bill Wright.
If you have any questions, please do not hesitate to call me at 263-4675.
Sincerely,
Marcia P. Matthieu
Cook Inlet Permits Coordinator
MPM:es
MPM/07/009
Enclosur'es:
Plan of Operations
CZM Questionnaire
CC:
J. Dygas, BLM, Anchorage*
L. Leatherberry, ADEC, SoldOtna
~.'..~,mith~A~CC~An~horag~.~t
B. Richey, USFWS, Soldotna*
J. Gabler, KPB, Soldotna*
H. Friedman, ADEC, Anchorage
B. Wright, DNR, Anchorage
*with attachments
ARCO Alaska, Inc. ~s a Subsidiary of AtlantlcRichtieidCompany .:R38-6063.C
Well Histo,ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this,
nature is accumulated at the end of the file under APPENDIX'
No 'special'effort has been made to chronologically
organize this category of information.
COMPANY:ARCO ALASKA INC.
WELL:SCU 33,-8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:ALASKA
uo!ss!u~u~oo 'suoo S~O ,g I!0 e>tsel¥
TAPE INFORMATION
FILE:LIS .001
FILE INTERVAL:
START= 11110.000
END= 9790.000
DEPT
11110.000
9790.000
AC ACQ CAL
RILD RILM SP
T2R2 TEMP TTEN
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
CHT CILD GR RFOC
SPD TlR1 TlR2 T2R1
-999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
COMPANY:ARCO ALASKA INC.
WELL:SCU 33,~ -8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:
RECEIVED
OCT 1 1990
Alaska Oil & Gas Cons. Commission
Aachorag~
FILE:LIS .002
FILE INTERVAL: START= 11190.000
END= 10880.000
DEPT
11190.000
10880.000
AC ACQ CAL
RILD RILM SP
T2R2 TEMP TTEN
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
CHT
SPD
-999.250
-999.250
-999.250
-999.250
CILD
TlR1
-999.250
-999.250
-999.250
-999.250
GR
TlR2
-999.250
-999.250
-999.250
-999.250
RFOC
T2R1
-999.250
-999.250
-999.250
-999.250
COMPANY:ARCO ALASKA INC.
WELL:SCU 33A-8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:
FILE:LIS .003
FILE INTERVAL:
START= 11180.000
END=
9840.000
DEPT
11180.000
9840.000
AC ACQ CAL
RILD RILM SP
T2R2 TEMP TTEN
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
CHT
SPD
-999.250
-999.250
-999.250
-999.250
CILD
TlR1
-999.250
-999.250
-999.250
-999.250
GR
TlR2
-999.250
-999.250
-999.250
-999.250
RFOC
T2R1
-999.250
-999.250
-999.250
-999.250
COMPANY:ARCO ALASKA INC.
WELL: SC~~A~~/~'---'" "~
FIELD:SOI~lTN2%--CREEK UNIT
COUNTY:KENAI
STATE:ALASKA
FILE:LIS .004
FILE INTERVAL: START= 10560.000
END= 10310.000
DEPT
CAL CHT GR SPD TTEN CN
DEV HRD1 HRD2 LSN PE PORZ
SFT2 SHR SSD SSN ZCOR ZDEN
CR2
RB
10560.000
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250
-999.250
10310.000
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250
-999.250
COMPANY:ARCO ALASKA INC.
WELL:SCU 33A-.8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:
FILE:LIS .005
FILE INTERVAL: START= 11160.000
END= 9910.000
DEPT
11160.000
CAL CHT GR SPD TTEN CN
DEV HRD1 HRD2 LSN PE PORZ
SFT2 SHR SSD SSN ZCOR ZDEN
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
CR2
RB
-999.250
-999.250
9910.000
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250 -999.250 -999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
COMPANY:ARCO ALASKA INC.
WELL:SCU 33A-8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:ALASKA
FILE:LIS .006
FILE INTERVAL: START= 11110.000
END= 9790.000
DEPT
CAL CHT GR SPD
C025 CILD RFOC RILD
TlR2 T2R1 T2R2 TEMP
TTEN
RILM
AC
SP
ACQ
TlR1
11110.000
-999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
9790.000
-999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
COMPANY:ARCO ALASKA INC.
WELL:SCU 33A-8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:ALASKA
FILE:LIS .007
FILE INTERVAL: START= 11190.000
END= 10880.000
DEPT
CAL CHT GR SPD
C025 CILD RFOC RILD
TlR2 T2R1 T2R2 TEMP
TTEN
RILM
AC
SP
ACQ
TlR1
11190.000
10880.000
-999.250 -999.250 -999.2
-999.250 -999.250 -999.2
-999.250 -999.250 -999.2
-999.250 -999.250 -999.2
-999.250 -999.250 -999.2
-999.250 -999.250 -999.2
50
50
50
50
50
50
-999.250
-999.250
-999.250,
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
COMPANY: ARCO ALASKA INC.
WELL:SCU 33A-8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:ALASKA
FILE:LIS .008
FILE INTERVAL: START= 11180.000
END= 9840.000
DEPT
CAL CHT GR SPD TTEN AC ACQ
C025 CILD RFOC RILD RILM SP TlR1
TlR2 T2R1 T2R2 TEMP
11180.000
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
9840.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250
COMPANY:ARCO ALASKA INC.
WELL:SCU 33A-8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:ALASKA
FILE:LIS .009
FILE INTERVAL: START= 10560.000
END= 10310.000
DEPT CAL CHT GR SPD TTEN CN CR2
DEV HRD1 HRD2 LSN PE PORZ RB
SFT2 SHR SSD SSN ZCOR ZDEN
10560.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
10310.000
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
COMPANY: ARCO ALASKA INC.
WELL:SCU 33A-8
FIELD:SOLDOTNA CREEK UNIT
COUNTY:KENAI
STATE:ALASKA
FILE:LIS .010
FILE INTERVAL: START= 11160.000
END= 9910.000
DEPT
CAL CHT GR SPD TTEN CN CR2
DEV HRD1 HRD2 LSN PE PORZ RB
SFT2 SHR SSD SSN ZCOR ZDEN
11160.000
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
9910.000
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250 -999.250
PROGRAM: LISCAN
REVISION: 5.2
Start of execution: Thu 17 JAN 91 3:40p
**** REEL HEADER ****
LIS
91/ 1/17
AWS
01
**** TAPE HEADER ****
LIS
91/ 1/17
PART NUMBER: W5790-MICRO
RFCEIVED
JAN ,? ~ !9nl
Alaska Oil & (~as uorls. ~ommJssior]
/mchora[l~
O1
FILE # 1
LIS .001
**** FILE HEADER ****
1024
CN : ARCO ALASKA
WN : SCU 33A-8
FN : SOLDOTNA CREEK UNIT
COUN : KENAI
STAT : ALASKA
* COMMENT RECORD *
API NO. 50-133-20241. PDK-100 LOGGED ON 10-28-90.
FILE 1 : 5160-6475
FILE 2 : 9600-11070
FILE 3 : REPEAT SECTION 10782-11070
FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
TAPE DEPTH UNIT : F
19 CURVES :
NAME CODE SAMPLE# UNIT BYTES
1 BKL 68 1 CPS 4
2 BKS 68 1 CPS 4
3 CCL 68 1 DIM 4
4 CSS 68 1 API 4
5 G1 68 1 CPS 4
6 G2 68 1 CPS 4
7 GElS 68 1 CPS 4
8 GR 68 1 API 4
9 ISS 68 1 CPS 4
10 LS 68 1 CPS 4
11 MON 68 1 CPS 4
12 MSD 68 1 SU 4
13 RATO 68 1 DIM 4
14 RBOR 68 1 DIM 4
15 RICS 68 1 DIM 4
16 RIN 68 1 DIM 4
17 SGMA 68 1 SU 4
18 SPD 68 1 F/MN 4
19 SS 68 1 CPS 4
* DATA RECORD
DEPTH
G1
LS
RICS
(TYPE#
BKL
G2
MON
RIN
o)
966 BYTES *
BKS
GElS
MSD
SGMA
CCL
GR
RATO
SPD
CSS
ISS
RBOR
SS
6480.000
0.0000000E+00
650.0000
-1.000000
0.0000000E+00
0.0000000E+00
0.0000000E+00
5.0O00O0
0.0000000E+00
0.0000000E+00
0.0000000E+00
0.0000000E+00
150.0000
0.0000000E+00
0.0000000E+00
0.0000000E+00
0.0000000E+00
0.0000000E+00
-1.000000
0.0000000E+00
6430.000
7168.090
1295.869
18.00893
57.49400
2228.280
2460.446
10.27886
250.4680
103346.5
0.1904036
17.94127
0.0000000E+00
19.98369
17.69722
22.99770
16998.36
306538.7
1.881050
22903.29
6380.000
5076.711
964.8521
18.42116
45.41600
1102.638
2455.879
9.843521
233.9130
91661.75
0.6861414
22.76015
0.0000000E+00
15.30952
20.81958
21.99780
14316.58
265134.6
1.837316
20071.88
6330.000
5043.598
926.9141
18.99127
45.60800
1127.869
2383.036
10.06766
171.1430
90254.37
0.1999305
22.79939
0.0000000E+00
14.57645
21.56082
21.99780
14262.46
270330.9
1.833061
19946.11
6280.000
8193.875
1457.071
18.46626
45.24701
2804.538
2475.883
10.33563
232.0040
98970.19
0.2017072
16.38051
0.0000000E+00
25.26617
15.34694
20.99791
17054.70
310002.7
1.885876
22552.36
6230.000
7608.043
1329.048
19.06165
68.70401
2445.459
2471.604
10.65681
222.8950
100970.6
0.2939817
17.05377
0.0000000E+00
25.66589
16.87869
21.88860
16874.55
314906.6
1.933121
22538.24
6180.000
4540.977
113.4090
944.1562
241.9090
102949.2
0.0000000E+00
44.59767
14804.79
310153.5
914.8740
21.07480
6130.000
5166.187
930.7261
19.76788
6080.000
7036.559
1189.818
18.70992
6030.000
7152.258
1194.528
18.44504
5980.000
7841.395
1345.010
18.59547
5930.000
6995.398
1253.437
18.90880
5880.000
5176.484
988.8582
18.54860
5830.000
5362.484
1054.062
18.96378
5780.000
5044.363
1002.420
19.49702
5730.000
5349.297
1103.726
18.93298
5680.000
5076.539
1004.144
18.94522
5630.000
6120.398
2443.694
10.48713
102.9660
1176.450
2444.164
10.34670
86.18800
2054.291
2435.333
10.43015
58.96600
2050.325
2436.454
10.34843
49.43500
2700.018
2414.970
10.39536
50.42700
2197.393
2431.455
10.25309
21.76700
1201.047
2341.092
9.696066
67.90201
1101.646
2379.972
9.829041
77.55899
1046.809
2387.345
10.05219
78.81702
1007.129
2399.237
9.820896
102.3710
1017.306
2361.652
9.825350
75.31300
1514.472
0.3890441
24.12482
240.3190
99815.62
0.4180241
22.82419
272.8140
99472.06
0.5013857
18.90263
235.7390
98527.56
0.5437986
18.62897
216.4210
96355.12
0.1959901
16.17467
190.6920
97134.94
0.2553493
17.74927
171.7060
87696.75
0.5792236
22.36147
184.7560
98088.19
0.3897373
24.02731
214.8820
96499.75
0.5927165
24.17004
259.2671
101934.0
0.6781373
25.24342
247.9460
99268.81
0.4557858
24.67245
241.5240
106861.5
21.36673
21.88860
0.0000000E+00
29.19633
21.85301
20.65291
0.0000000E+00
31.82014
18.69220
20.99791
0.0000000E+00
29.48671
18.02586
19.99800
0.0000000E+00
23.67404
16.15039
19.99800
0.0000000E+00
26.'14098
17.12289
19.99800
0.0000000E+00
9.249418
19.86537
19.99800
0.0000000E+00
26.41754
20.08379
19.76221
0.0000000E+00
29.96030
20.88402
20.23380
0.0000000E+00
30.76031
20.25314
19.99800
0.0000000E+00
31.61989
21.36890
20.76210
0.0000000E+00
22.37480
1.973007
19543.04
15116.34
302660.4
1.837927
20440.66
16384.58
307978.9
1.921361
22307.00
16182.34
303941.7
1.921287
21543.39
16446.14
305029.6
1.885904
21711.18
16041.52
303828.4
1.912896
21496.27
14046.22
263652.4
1.820388
19609.43
15269.03
287075.7
1.820552
21120.50
15001.65
287037.5
1.850325
20915.32
15877.61
293420.5
1.823397
22402.72
15353.02
291974.9
1.809469
21435.42
16684.07
301765.1
1215. 198
18.41011
5580.000
5077.332
1032.403
18.72441
5530.000
7073.543
1318.883
18.19405
5480.000
5266.855
1049.084
19.53908
5430.000
4958.957
985.5171
19.68301
5380.000
5232.578
978.4631
19.39410
5330.000
5978.227
1129.716
18.47678
5280.000
4195.457
895.2700
21.00317
5230.000
5327.469
1000.901
19.22896
5180.000
5242.219
1066.699
19.19322
5130.000
-999.2500
-999.2500
-999.2500
2355.738
9.735294
50.94501
1119.516
2325.120
9.385191
54.87300
2231.349
2358.475
10.04478
83.35600
1099.105
2350.890
10.15382
60.33401
1054.610
2349.604
10.01359
88.83701
1205.636
2340.341
10.05435
60.20200
1547.604
2324.814
9.731806
89.47400
770.8669
2303.687
10.04445
79.75302
1215.314
2366.590
9.982750
66.36699
1187.029
2293.137
9.844952
-999.2500
-999.2500
-999.2500
-999.2500
0.4218925
21.44296
203.7570
91282.44
0.4910129
23.17209
218.8850
100538.3
0.3511820
17.69005
268.4900
100198.2
0.5638193
23.52850
247.0080
99340.50
0.2880580
23.35545
255.3170
99873.75
0.5693165
22.52483
209.6200
100138.1
0.5113096
20.57410
244.1130
99414.81
0.6701261
26.57689
189.5640
100047.8
0.2731424
22.61096
212.0880
105905.2
0.3934516
22.72710
-999.2500
-999.2500
-999.2500
-999.2500
18.63228
20.34300
0.0000000E+00
15.53677
19.91762
19.99800
0.0000000E+00
24.20862
16.66609
19.99800
0.0000000E+00
36.32799
20.31772
19.99800
0.0000000E+00
34.27061
20.81268
20.23380
0.0000000E+00
31.02789
21.26532
19.99800
0.0000000E+00
28.34161
19.06033
23.23351
0.0000000E+00
37.48914
22.36644
22.99770
0.0000000E+00
29.37993
21.20673
22.23360
0.0000000E+00
22.41734
20.55598
22.99770
-999.2500
-999.2500
-999.2500
-999.2500
1.859649
22701.86
14457.63
270702.3
1.839612
20545.75
16516.98
302083.3
1.905868
22030.12
15448.86
298812.7
1.870439
21322.32
14962.90
294751.8
1.875312
20529.96
15292.47
296925.5
1.807742
20853.86
15777.44
294794.5
1.841079
21469.59
14566.14
294720.9
1.899639
20044.47
15413.93
296437.2
1.860657
21231.29
16021.10
307868.9
1.906284
21931.23
-999.2500
-999.2500
-999.2500
-999.2500
TOTAL DATA RECORDS : 226
STARTING TAPE DEPTH = 6480.00 ENDING TAPE DEPTH =
**** FILE TRAILER ****
5130.00
**** REEL HEADER ****
LIS
91/ 1/17
AWS
01
**** TAPE HEADER ****
LIS
91/ 1/17
01
FILE # 2
LIS .001
**** FILE HEADER ****
1024
CN : ARCO ALASKA INC.
WN : SCU 33A-8
FN :
COUN :
STAT :
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
TAPE DEPTH UNIT : F
19 CURVES :
NAME CODE SAMPLE# UNIT
1 BKL 68 1 CPS
2 BKS 68 1 CPS
3 CCL 68 1 DIM
4 CSS 68 1 API
5 G1 68 1 CPS
6 G2 68 1 CPS
7 GElS 68 1 CPS
8 GR 68 1 API
9 ISS 68 1 CPS
10 LS 68 1 CPS
11 MON 68 1 CPS
12 MSD 68 1 SU
13 RATO 68 1 DIM
BYTES
4
4
4
4
4
4
4
4
4
4
4
4
4
14 RBOR
15 RICS
16 RIN
17 SGMA
18 SPD
19 SS
68 1 DIM 4
68 1 DIM 4
68 1 DIM 4
68 1 SU 4
68 1 F/MN 4
68 1 CPS 4
* DATA RECORD
DEPTH
G1
LS
RICS
(TYPE#
BKL
G2
MON
RIN
o)
966 BYTES *
BKS
GElS
MSD
SGMA
CCL
GR
RATO
SPD
CSS
ISS
RBOR
SS
11070.000
0.0000000E+00
650.0000
0.0000000E+00
0.0000000E+00
0.0000000E+00
0.0000000E+00
5.000000
0.0000000E+00
0.0000000E+00
0.0000000E+00
0.0000000E+00
150.0000
0.0000000E+00
0.0000000E+00
0.0000000E+00
0.0000000E+00
0.0000000E+00
-1.000000
0.0000000E+00
11020.000
12511.76
1932.648
15.09858
158.8210
4309.961
3300.376
11.98092
373.9050
96381.94
0.1874521
15.98144
0.0000000E+00
123.7662
15.79305
22.99770
20980.56
314242.1
1.664043
30530.30
10970.000
10150.63
1533.460
15.79429
120.7390
3109.132
3117.938
12.10131
309.5649
96826.12
0.2627153
18.24855
0.0000000E+00
51.89078
18.72612
22.99770
19310.33
313219.0
1.683981
28486.89
10920.000
12483.41
1957.232
15.04401
91.54799
4325.258
3192.947
11.62753
248.1910
99303.19
0.3351129
15.89746
0.0000000E+00
39.46725
15.93975
22.99770
21335.35
323410,2
1.714613
31230.87
10870.000
8260.926
1404.426
15.34377
108.7660
2402.488
2908.076
11.80223
233.2770
94963.50
0.5085425
19.25786
0.0000000E+00
54.80379
18.43800
23.55571
17584.70
298212.9
1.645560
25657.14
10820.000
7689.637
1283.845
18.22527
165.8320
1719.004
2810.799
12.31403
284.9351
107314.4
0.2872421
22.76097
0.0000000E+00
60.43878
21.39679
16.99831
18640.70
324349.8
1.779038
27537.29
10770.000
11671.28
2033.326
15.07886
67.42801
3921.956
2941.420
12.17607
260.1431
110349.1
0.4156445
16.53484
0.0000000E+00
28.43834
15.59617
26.40361
21878.68
342495.6
1.749484
31601.68
10720.000
10244.27
1685.348
15.88055
93.02802
2924.376
2755.317
11.90718
263.5400
109104.4
0.4769421
19.02374
0.0000000E+00
32.96024
17.93819
26.99730
20682.27
325651.0
1.722606
30263.75
10670.000
11020.61
1858.247
15.71591
10620.000
9415.832
1449.247
15.47735
10570.000
11240.85
1785.744
15.22653
10520.000
12199.12
2061.836
14.87071
10470.000
7706.234
1335.357
16.95839
10420.000
10784.55
1764.974
15.48162
10370.000
7681.566
1254.297
16.99777
10320.000
11662.96
1888.833
15.05308
10270.000
7274.992
1211.909
17.36603
10220.000
10461.30
1722.025
15.35571
10170.000
7003.602
1169.508
16.98070
90.94200
3497.204
2702.283
11.34024
53.64101
2769.959
2664.328
11.58728
77.70801
3428.572
2781.749
12.06738
46.20500
4132.363
2641.063
11.75607
107.5980
1778.699
2574.566
12.41431
70.55002
3090.787
2609.170
11.87439
91.25500
1766.595
2586.187
12.21028
72.24101
3613.819
2597.042
11.78506
102.0500
1597.135
2562.306
12.42337
84.03500
3069.073
2564.230
11.91978
97.25200
1428.821
2502.792
12.60106
262.1689
111753.1
0.3059405
17.59192
182.3160
97799.00
0.3663825
18.58362
255.5240
108158.7
0.3726245
18.14381
259.6060
112157.5
0.2567885
16.69865
272.7000
107984.8
0.6356775
22.30573
288.2471
108007.0
0.3290945
18.71124
218.5350
103582.9
0.5951030
22.40862
275.7539
110558.9
0.3317572
17.71164
297.1030
104168.9
0.5431854
22.89134
245.9670
105880.1
0.3098397
18.54466
286.2080
104961.1
0.4935901
23.86122
0.0000000E+00
29.58258
16.56270
26.99730
0.0000000E+00
27.40530
19.46457
23.99760
0.0000000E+00
26.02113
17.89316
24.99750
0.0000000E+00
21.70944
16.24640
22.99770
0.0000000E+00
40.87236
20.86746
22.99770
0.0000000E+00
26.81079
17.98860
22.99770
0.0000000E+00
39.09686
22.08978
23.00360
0.0000000E+00
31.40625
17.51057
23.03340
0.0000000E+00
38.67236
22.52054
18.99811
0.0000000E+00
29.62971
17.70181
17.99820
0.0000000E+00
41.62711
23.02782
24.99750
21396.85
333181.1
1.761847
30724.07
19005.63
300800.2
1. 694388
28132.28
21573.82
328498.7
1.691390
31928.85
22857.68
338946.9
1.703333
33608.71
18870.27
319960.5
1.708740
27878.38
21279.37
325071.1
1.662028
31755.84
18470.94
309422.3
1.697981
27732.52
22223.10
332503.9
1.686560
33066.94
18228.77
314143.9
1.721252
27340.45
20636.70
318035.9
1.695352
30487.58
18051.85
313465.9
1. 672306
27008.94
10120.000
6711.602
1055.697
16.67538
10070.000
9308.980
1513.538
15.83194
10020.000
7947.477
1346.713
16.29218
9970.000
8605.207
1459.932
16.00853
9920.000
8509.277
1425.244
15.64404
9870.000
4570.113
794.0310
21.91646
9820.000
5035.754
876.1731
20.63826
9770.000
4303.754
729.0801
23.12914
9720.000
4777.398
863.1292
20.96188
9670.000
6821.363
1087.983
19.79730
9620.000
4883.484
751.8262
23.21989
123.3120
1569.523
2482.594
11.80531
61.27200
2546.954
2503.455
11.72742
83.88402
1928.250
2492.682
.11.60783
98.61201
2267.656
2483.387
11.78699
76.88800
2215.513
2490.144
11.27053
39.22499
1036.412
2460.431
13.72997
70.57202
1159.130
2438.411
13.09758
50.73201
845.2202
2435.723
12.78685
59.38202
1015.243
2453.116
13.42131
30.67700
2025.569
2444.624
13.04096
53.51001
1215.194
2427.823
14.55978
254.7560
94412.31
0.4089018
22.28992
221.7320
105226.1
0.3578153
19.77437
271.3691
104780.6
0.4123809
21.75748
235.2680
101837.1
0.4148905
20.56995
234.1890
102543.1
0.3751385
20.44710
185.4750
94166.25
0.5365548
22.86313
190.0230
93131.44
0.4460585
22.29608
218.5820
91717.31
0.5121405
24.71198
195.0610
95500.87
0.8616526
23.41704
199.4330
96800.37
0.5592101
18.68506
180.0840
88677.87
0.6440352
21.24590
0.0000000E+00
35.10986
24.15135
25.40370
0.0000000E+00
31.85503
19.80191
23.99760
0.0000000E+00
30.62875
20.92038
24.59131
0.0000000E+00
32.06706
19.83658
24.96181
0.0000000E+00
28.12401
20.34027
23.99760
0.0000000E+00
18.98952
23.99846
24.99750
0.0000000E+00
23.48921
22.52827
23.99760
0.0000000E+00
20.11668
24.95540
24.03329
0.0000000E+00
26.14006
22.61375
24.99750
0.0000000E+00
18.49055
19.85329
25.00340
0.0000000E+00
22.44148
23.24756
25.93221
16861.49
284557.0
1.680942
25523.68
19944.85
317717.6
1.677056
29943.34
18799.85
306990.5
1.687329
28217.00
19153.53
308106.4
1.666698
28911.24
19235.05
294304.7
1.640283
29045.32
14058.54
297434.2
1.946190
19031.70
14474.19
300410.9
1.835965
19842.32
13484.27
293611.6
1.981878
18200.61
14392.86
302402.4
1.908745
19499.80
15994.75
317448.4
1.949350
21521.80
13302.42
304263.6
1.993253
17382.97
9570.000
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
TOTAL DATA RECORDS : 251
STARTING TAPE DEPTH = 11070.00 ENDING TAPE DEPTH =
**** FILE TRAILER ****
9570.00
**** REEL HEADER ****
LIS
91/ 1/17
AWS
01
**** TAPE HEADER ****
LIS
91/ 1/17
01
FILE # 3
LIS .001
**** FILE HEADER ****
1024
CN : ARCO ALASKA INC.
WN : SCU 33A-8
FN :
COUN :
STAT :
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
TAPE DEPTH UNIT : F
19 CURVES :
NAME
1 BKL
2 BKS
3 CCL
4 CSS
5 G1
CODE SAMPLE# UNIT
68 1 CPS
68 1 CPS
68 1 DIM
68 1 API
68 1 CPS
BYTES
4
4
4
4
4
6 G2 68 1 CPS 4
7 GElS 68 1 CPS 4
8 GR 68 1 API 4
9 ISS 68 1 CPS 4
10 LS 68 1 CPS 4
11 MON 68 1 CPS 4
12 MSD 68 1 SU 4
13 RATO 68 1 DIM 4
14 RBOR 68 1 DIM 4
15 RICS 68 1 DIM 4
16 RIN 68 1 DIM 4
17 SGMA 68 1 SU 4
18 SPD 68 1 F/MN 4
19 SS 68 1 CPS 4
* DATA RECORD
DEPTH
G1
LS
RICS
(TYPE#
BKL
G2
MON
RIN
o)
966 BYTES
BKS
GElS
MSD
SGMA
CCL
GR
RATO
SPD
CSS
ISS
RBOR
SS
11080.000
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
11030.000
5528.891
993.0522
19.30270
148.1190
1105.810
2169.027
12.18691
225.3120
93311.75
0.5389498
24.94214
0.0000000E+00
69.42003
22.31114
15.99840
15227.85
296183.6
1.764856
22194.48
10980.000
8412.031
1465.698
17.51926
100.4350
2596.654
2387.983
11.93713
244.4720
91078.37
0.3022741
17.89978
0.0000000E+00
45.64157
16.71947
14.99850
16947.82
295910.5
1.852182
24445.11
10930.000
10379.99
2151.286
15.35420
77.10501
3422.887
2859.588
11.73124
215.6990
105916.7
0.3242901
16.69493
0.0000000E+00
36.42180
12.83556
14.10780
19814.32
329764.5
1.742902
27564.31
10880.000
5295.762
961.3101
18.70392
127.2230
1099.819
2892.092
12.20962
278.6670
86347.44
1.056581
24.00710
0.0000000E+00
63.41640
21.73962
22.76190
14265.80
271605.6
1.778209
20989.91
10830.000
3973.344
759.5222
20.03207
149.1740
680.1160
2877.055
12.42394
281.2041
81128.62
0.8540339
27.34581
0.0000000E+00
67.69835
24.09541
24.99750
12682.78
258110.9
1.716653
18320.46
10780.000
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
TOTAL DATA RECORDS :
STARTING TAPE DEPTH =
**** FILE TRAILER ****
51
11080.00 ENDING TAPE DEPTH = 10780.00
**** TAPE TRAILER ****
LIS
91/ 1/17
01
TOTAL RECORDS IN THIS LOGICAL TAPE : 548
**** REEL TRAILER ****
LIS
91/ 1/17
AWS
01
TOTAL RECORDS IN THIS LOGICAL REEL : 549
TOTAL RECORDS IN THIS PHYSICAL REEL: 549
End of execution: Thu 17 JAN 91 3:41p
Elapsed execution time = 40.32 seconds.
SYSTEM RETURN CODE = 0