Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutCO 213Conservation Order Cover Page XHVZE This page is required for administrative purposes in managing the scanning process. It marks the extent of scanning and identifies certain actions that have been taken. Please insure that it retains it's current location in this file. ~1_~'~__ Conservation Order Category Identifier Organizing RESCAN DIGITAL DATA OVERSIZED (Scannable with lame plotter/scanner) [] Color items: [] Diskettes, No. [] Maps: [] Grayscale items: D Other, NofType [] Other items [] Poor Quality Originals: OVERSIZED (Not suitable for [] Other: plotter/scanner, may work with 'log' scanner) [] Logs of various kinds [] Other NOTES: BY: ROBIN ~ Scanning Preparation BY: ROBIN ~ Production Scanning TOTAL PAGES 7 '~11~ Stage I PAGE COUNT FROM SCANNED DOCUMENT: PAGE COUNT MATCHES NUMBER IN SCANNING PREPAR/(TION: __~ YES NO Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATI'ENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALn'Y, GRAYSCALE OR COLOR IMAGES) General Notes or Comments about this Document: 5/21/03 ConservOrdCvrPg.wpd STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Re: THE APPLICATION OF ARCO ) ALASKA, INC. and SOHIO ) ALASKA PETROLEUM COMPANY for) an order amending Rules 6 ) and 11 of Conservation Order) No. 165 and Rule 6 of ) Conservation Order No. 208. ) Conservation Order No. 213 Prudhoe Bay Field Prudhoe Oil Pool October 8, 1985 IT APPEARING THAT: I . ARCO Alaska, Inc. and Sohio Alaska Petroleum Company, operators of the Prudhoe Bay Unit, by letter dated September 12, 1985, requested the Alaska Oil and Gas Conservation Commission to amend Rules 6 and 11 of Conservation Order No. 165 and Rule 6 of Conservation Order No. 208 to allow administrative approval for extensions and/or waivers of required pressure surveys, ~gas-oil contact monitoring and productivity profiles. · Notice of public hearing was published in the Anchorage Times on September 23, 1985. · There were no protests to the request set forth in the notice of public hearing. FINDING: Innovative well completion techniques for the Prudhoe Oil Pool, both currently used and proposed, and maturing of reservoir performance obviate the ability and need to obtain conventional pressure and productivity profile surveys from these types of wells. CONCLUSIONS: Innovative well completion techniques do not create waste and may enhance ultimate recovery from the Prudhoe Oil Pool. ~ The Alaska Oil and Gas Conservation Commission requires flexibility to administratively approve variances to previous orders to provide the ability to timely respond to changing conditions. Conservation Ord ~o No. 213 Page 2 October 8, 1985 NOW, THEREFORE, it is ordered that: Rule 1. Rule 6(h) of Conservation Order No 165 is amended to read: By administrative approval the Commission may grant time extensions and waive requirements of this rule and by administrative order the Commission may require additional pressure surveys or modify the key wells designated in (c) of this rule and as amended in Rule 1 of Conservation Order No. 208. Rule 2. Rule ll(d) of Conservation Order No. 165 is amended to read: By administrative approval the Commission may waive the requirements of (a), (b) and (c) and by administrative order the Commission may specify additional surveys other than the surveys submitted under (a), (b) and (c) of this rule. Rule 3.. Rule 6 of Conservation Order No. 208, amending Rule 9(f) of Conservation Order No. 165 is amended to read: By administrative approval the Commission may delay, modify or waive the logging requirements of Rule 9 of Conservation Order No. 165 and by administrative order, the Commission may require additional wells to be logged. DONE at Anchorage, Alaska and dated October 8, 1985 ~T'-V. ChR't~-~Zob~Z, Chairman Alaska Oil arfd ~as Conservation Commission Harry W. er gl , ssioner Alaska Oil and Gas Conservation Commission Le~nnie C. Smith, Commissioner Alaska Oil and Gas Conservation Commission WALTER J. HICKEL, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 May 5, 1993 ADNINISTRATIVE APPROVAL NO. 213.40 Re: The application of Arco Alaska, Inc. and BP Exploration (Alaska), Inc. to waive requirements of Rule ll(a) of Conservation Order 165 for wells completed with a single perforated interval, or with perforations in a single reservoir zone including highly deviated (greater than 65 degrees) and horizontal wells in the Prudhoe Oil Pool, Prudhoe Bay Field, North Slope Alaska. D.F. Scheve C.J. Phillips Manager, PB Operations Engineering Manager, PB Petroleum Engineering ARCO Alaska, Inc. BP Exploration (Alaska), Inc. P.O. Box 100360 P.O. Box 196612 Anchorage, AK 99510-0360 Anchorage, AK 99519-6612 Gentlemen: The referenced application was received on April 23, 1993. The request is limited to new wells drilled in the Prudhoe Oil Pool of the Prudhoe Bay Field. Rule ll(a) C.O. 165 requires a production profile Survey in each new well during the first six months the well is on production. A waiver is requested because surveys in wells which are completed in a single reservoir zone or with only one perforated interval provide no meaningful data for surveillance of reservoir zone depletion. The Alaska Oil and Gas Conservation Commission has reviewed the application and relevant evidence and finds that waiving the requirement for productivity profile surveys in the specified wells will not preclude surveillance of zone depletion, will not cause waste nor jeopardize correlative rights. Sufficient alternatives exist to accommodate future surveillance requirements and the Commission may administratively order additional surveys if the need arises. Rule 2, Conservation Order 213 allows the Commission to waive requirements of Conservation Order 165 Rule 11 by administrative order. Therefore, the Commission authorizes waiver of Rule ll(a) Conservation Order 165 for wells completed with a single perforated interval, or with perforations in a single reservoir zone including highly deviated (greater than 65 degrees) and horizontal wells in the Prudhoe Oil Pool, Prudhoe Bay Field. Sincerely, BY ORDER OF THE COMMISSION ALASKA OIL AND GAS CONSERVATION CO~i~IISSION ~ WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 March 2, 1993 ADMINISTRATIVE APPROVAL NO. 213.39 Re: The application of Arco Alaska, Inc. and BP Exploration (Alaska), Inc. to waive requirements of Rule 9(a) Conservation Order 165 in the waterflood/EOR areas of the Prudhoe Oil Pool, Prudhoe Bay Field, North Slope Alaska. D.F. Scheve Manager, PB Operations Engineering ARCO Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 C.J. Phillips Manager, PB Petroleum Engineering BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK. 99519-6612 Gentlemen: The referenced application was received on January 15, 1993. The request is limited to new wells drilled in areas of the field influenced by waterflood operations where GOC movement is not anticipated. The area of interest is defined as the waterflood/EOR areas encompassed by the expanded Prudhoe Bay Miscible Gas Project outlined in C.O. 290, excluding Drill Sites 4 and 11, including structurally Iow areas west of S and M Pads, and an area east of R Pad adjacent to and influenced by WF/EOR operations. The areas outlined are not expected to have significant GOC movement or gas encroachment from the gravity drainage area. The Alaska Oil and Gas Conservation Commission has reviewed the evidence available and finds that waiving the requirement to run neutron logs in each new well in the specified areas will not preclude monitoring capability, will not cause waste nor jeopardize correlative rights. Sufficient alternatives exist to accommodate future surveillance requirements if the need arises and the Commission has the capability to administratively order additional logs if required. Therefore, the Commission authorizes waiver of Rule 9(a) Conservation Order 165 in the areas as specified. Sincerely, Russell A. Douglass, Commissioner BY ORDER OF THE COMMISSION ~) prinled on recycled paper b y C, r). March 2, 1993 ALASKA ()IL A~I) GAS CONSERVATION COM~IISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.38 Re: The application of Arco Alaska, Inc. to waive requirements of Rule 1 l(a) of Conservation Order 165 in six wells completed in the Prudhoe Oil Pool, Prudhoe Bay Field, North Slope Alaska. Mark O. Johnson, Sr. Operations Engineer ARCO Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Johnson: The referenced application was received on February 22, 1993. The request is limited to six wells drilled at Drill Sites 15 and 18 in the Prudhoe Oil Pool of the Prudhoe Bay Field. A waiver is requested because the wells are single zone completed conventional and horizontal high angle wells where production profile data is not meaningful or useful for surveillance of reservoir depletion. The Six wells are: DS 18-22 DS 18-26 DS 18-27 DS 15-28 DS 15-30 DS 15-31 APl # 50-029-22303 APl # 50-029-22329 APl # 50-029-22321 APl # 50-029-22247 APl # 50-029-22282 APl # 50-029-22285. The Alaska Oil and Gas Conservation Commission has reviewed the evidence available and finds that waiving the requirement for productivity profile surveys in the specified wells will not preclude surveillance of zone depletion, will not cause waste nor jeopardize correlative rights. Sufficient alternatives exist to accommodate future surveillance requirements and the Commission may administratively order additional surveys if the need arises. Therefore, the Commission authorizes waiver of Rule 1 l(a) Conservation Order 165 in the wells as specified. Sincerely, Russell A. Douglass, Commissioner BY ORDER OF THE COMMISSION ~ printed on recycled papr, r b y ..C. WALTER J. HICKEL, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION December 18, 1992 Re: 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 ADMINISTRATIVE APPROV~ Waiver of Neutron logging requirements of Rule 9(a), Conservation Order No. 165 for Prudhoe Bay Unit wells 4-14A, 12-6A, 12-10A, 12-14st, 16-28, 16-29A, 16-30, 16-31, 17-15, 17-16, 17-19, 17-20 and 17-21. Donald F. Scheve' Operations Engineering Mgr, Prudhoe Bay Engineering ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: / By your letter dated December 14, 1992, you requested waiver of Neutron logging requirements for the above referenced Prudhoe Oil Pool wells. Acquisition of Neutron log data for the purpose of monitoring gas-oil contact movement, is required of all Prudhoe Oil Pool wells prior to sustained production by Rule 9(a) of Conservation Order (C.O.) 1165. We note that with the exception of injector 4-14A, all the subject wells are located on the downdi.p periphery of waterflood/EOR project areas where no gas-°il contact m. ove~nent issues exist. Injector 4-1.4A will not experience a period of sustained production unless it is subsequently converted to a producer. The requirements of rule 9(a), C.O. 165 will not pertain to 4-14A until that time. The Commission is presently unwilling to waive the requirements of C.O. 165 rule 9(a) for well 4-14A. The Cmmnission approves your request to waive Neutron logging requirements of Rule 9(a) of C.O. 165 for PBU wells 12-6A, 12-10A, 12-14st, 16-28, 16-29A, 16- 30, 16-31, 17-15, 17-16, 17-19, 17-20 and 17-21. Very truly yours, Russell A. Douglass, Co~mnissioner BY ORDER OF TH.E COMMISSION ALASKA OIL AND GAS CONSERVATION COMMISSION May ]4, ]992 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 ADMINISTRATIVE APPROVAL NO. ~.13.36 Re .' Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 for PBU DS 4-34A, DS 4-36 and DS 4-39. Daniel J. Caf f fey FS 2 Regional Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK. 99510-0360 Dear Mr. Caf f fey: We have received your correspondence dated April 24, 1992 requesting initial productivity profile waivers for Prudhoe Bay Unit (PBU) wells DS 4-34A, DS 4-36 and DS 4-39. These wells are completed in only one zone, therefore a production profile would not yield additional information pertinent to reservoir depletion. The Commission hereby waives the productivity profile requirements of Rule 11, Conservation Order 165 for PBU wells DS 4-34A, DS 4-36 and DS 4-39. In the future if well operations change sufficiently, the running of production profiles may be reconsidered. Sincerely, Russell A. Douglass Commissioner BY ORDER OF THE COMMISSION ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1~ TELECOPY: (907) 276-7542 May 5, 1992 ADMINISTRATIVE APPROVAL NO. 213.35 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 for PBU wells Mark O. Johnson Sr. Operations/Analytical Eng/neer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK. 99510-0360 Dear Mr. Johnson: We have received your correspondence dated April 29, 1992 requesting initial productivity profile waivers for Prudhoe Bay Unit (PBU) wells DS2-33, DS2-34, DS2-35, DS5-20, DS5-22, DS5-.30, DS5-31, DS5-32, DS15-23, DS15-24, DS15-26 and DS15-27. These wells are completed in only one zone, therefore a production profile would not yield additional information pertinent to reservoir depletion. The Commission hereby waives the productivity profile requirements of Rule 11, Conservation Order 165 for PBU wells DS2-33, DS2-34, DS2- 35, DS5-20, DS5-22, DS5-30, DS5-31, DS5-32, DS15-23, DS15-24, DS15- 26 and DS15-27. In the future if well operations change sufficiently, the running of production profiles may be reconsidered. Sincerely, Russell A. Do~ Commissioner BY ORDER OF THE COMMISSION ALASKA OIL AND GAS CONSERVATION COMMISSION October 21, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-14,.33 TELECOPY: (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.34 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 for PBU DS 9-43. Daniel J. Caf f fey Regional Engineer Prudhoe Bay Operations Engineering ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK. 99510-0360 Dear Mr. Caffrey: We have received your correspondence dated October 11, 1991 requesting a productivity profile waiver for Prudhoe Bay Unit (PBU) well DS 9-43. This well is completed in only one zone, therefore a production profile would not yield additional information pertinent to reservoir depletion. The commission hereby waives the productivity profile requirements of Rule 11, Conservation Order 165 for PBU well DS 9-43. .~., In the future if well operations change sufficiently, the running of a production profile may be reconsidered. Sincerely, Russell A. Douglass Commissioner BY ORDER OF THE COMMISSION ~7~ printed on recycled paper b y C,.D. ALASKA OIL AND GAS CONSERVATION COMMISSION October 11, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-14.33 TELECOPY: (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.33 Re .' Waiver of productivity/injectivity profile requirements of Rule 11, Conservation Order No. 165. Lamar L. Gantt Sr. Area Operations Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK. 99510-0360 Dear Mr. Gantt: We have received your correspondence dated September 24, 1991 requesting productivity/injectivity profile waivers for Prudhoe Bay Unit (PBU) wells DS 9-39, DS 9-42, DS9-44 and DS 9-47. All of these wells are completed in only one zone, therefore a production/injection profile would not yield additional information pertinent to reservoir depletion. The Commission hereby waives the productivity profile requirements of Rule 11, Conservation Order 165 for PBU wells DS 9-39, DS 9-42, DS 9-44 and DS 9-47. In the future if well operations change sufficiently, the running of a production/injection profile may be reconsidered. Sincerely, Russell A. Douglass Commissioner BY ORDER OF THE COMMISSION ALASKA OIL AND GAS CONSERVATION COMMISSION July 17, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.32 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165. Lamar L. Gantt Sr. Area Operations Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK. 99510-0360 Dear Mr. Gantt: We have received your correspondence dated July 3, 1991 requesting a productivity profile waiver for Prudhoe Bay Unit (PBU) DS 11-22. This well has exhibited production problems since completion and further evaluation is needed to determine the scope of remedial work required to solve the problems. Evaluation and subsequent workover will extend beyond the time limit for a productivity profile required by Rule 11(a) of Conservation Order No. 165. The Commission hereby allows the initial productivity profile required by Rule 11, Conservation Order 165 for PBU DS 11-22 to be run within 60 days following the completion of remedial work required to correct initial production problems. Sincerely, Commissioner BY ORDER OF THE COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 July 3, 1991 ADMINISTRATIVE APPROVAL NO. 213.31 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165. R. B. Frazier Prudhoe Gravity Drainage BP Exploration (Alaska) Inc. P. O. Box 196612 Anchorage, AK 99519-6612 Dear Mr. Frazier: We have received your correspondence dated June 18, 1991 requesting a productivity profile waiver for Prudhoe Bay Unit (PBU) well F-46. Well F-46 is completed in a single zone over a 25' TVD perforated interval. Since all production would necessarily enter the well from this zone, a productivity profile would not yield additional information pertinent to reservoir depletion. The Commission hereby waives the productivity profile requirements of Rule 11, Conservation Order No. 165 for PBU well F-46. In the future, if well operations change sufficiently, the running of a production profile may be reconsidered. Sincerely, ~ ~~ugl~SS]er "--,_3 ' BY ORDER OF THE COMMISSION Telecopy No. (907) 276-7542 July 9, 1990 ADMINISTRATIVE APPROVAL NO. 213.30 Re: Waiver of productivity profile requirements of Rule. ]1, Conservation Order No. 165 D F Scheve Operations Engineering Mgr ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: We have received your letter of June 29, 1990 requ~esting a productivity profile waiver for Prudhoe Bay Unit (PBU) well DS 18-23. The Commission hereby waiVes the productivity profile require- ments of Rule 11, Conservation Order No. 165 for PBU well DS 18-23 due to the fact that only 10' of perforations are open. in Zone 1. In the future, if well operations change sufficiently, the running of a production profile' may be"'reconsidered. Sincerely, ¢ Commissioner BY~ ORDER OF THE CO}~MISSION dlf / 3A. AA213 Telecopy No. (907) 276-7542 January 19, 1990 ADMINISTRATIVE APPROVAL NO. 213.29 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 '~ T B Gray, Manager Reservoir Surveillance BP Exploration (Alaska) Inc P O Box 196612 Anchorage, AK 99519-6612 Dear Mr Gray: We have received your letter of January 10, 1990 reqUesting a productivity profile waiver for Prudhoe Bay Unit (PBU) well F-34. The well is completed in a single zone. Since all production would necessarily enter the well from this zone, a productivity profile would not yield additional information pertinent to reservoir depletion, The Commission hereby waives the productivity profile require- ments of Rule 11, Conservation Order No. 165 for PBU well F-34. In the future, if well operations change~ sufficiently, the running of a production profile may be reconsidered. $inc , 'Lonnie Commissioner BY ORDER OF THE COMMISSION jo/3.AA213 Telecopy No. (907) 276-7542 October 30, 1989 ADMINISTRATIVE APPROVAL NO. 213.28 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 D F $cheve Operations Engineering Mgr ARCO Alaska, Inc P 0 Box 100360 Anchorage, AK 99510-0360 Dear Mr $cheve: We have received your letter of October 27, 1989 requesting a productivity profile waiver for Prudhoe Bay ~Unit (PBU) well DS 14-40. The Co~mnission hereby waives the productivity' profile required by Rule 11, Conservation Order No. 165 for PBU well DS 14-40 due ~o the inability of conventional tools to reach the production i~'~tervals in high angie, wells. In '~he future, if well operations change sufficiently, the running of a production profile may be reconsidered. Commis s ioner BY ORDER OF THE CO~R~ISSiON dl~/3.AA213 Telecopy No. (907) 276-7542 October 25, 1989 ADMINISTRATIVE APPROVAL NO. 213.27 Re: Waiver of productivity profile requirements of Rule i1, Conservation Order No. 165 T. B. Gray, Manager Reservoir Surveillance BP Exploration (Alaska) Inc. P. O. Box 196612 Anchorage, Ali 99519-6612 Dear Mr. Gray: We have received your letter of October 18, 1989 requesting a productivity profile waiver for Prudhoe Bay Unit (PBU) well F-22. The well is completed~in a single zone. Since all production would necessarily enter the well from this zone, a productivity profile would not yield additional information pertinent to reservoir depletion. The Commission hereby waives the prOduCtivitY profile require- ments of Rule 11, Conservation Order No. 165 for PBU well F-22. In the future, if well operations change sufficiently, the running of a production profile may be reconsidered. Sincerely, Lonnie O, Smith Commissioner BY ORDER OF THE CO~RRiSSiON dlf/3,AA2t3 Telecopy No. (907) 276-7542 October 16, 1989 ADMINISTRATIVE APPROVAL NO. 213.26 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 T B Gray, Manager Reservoir Surveillance BP Exploration (Alaska) Inc P O Box 196612 Anchorage, AK 99519-6612 Dear Mr Gray: We have received your letters of October 11, 1989 requesting a productivity profile waiver for Prudhoe Bay Unit (PBU) wells Z-9 and Z-29, Both wells are completed in a single zone. Since all production would necessarily enter the well from this zone, a productivity profile would not yield additional information pertinent to reservoir depletion.. The Co~mnission hereby waives the productivity profile required by Rule lla, Conservation Order No. 165 for PBU wells Z-9 and Z-29. In the future, if well operations change sufficiently, the rumning of a production profile may be reconsidered. Sincerely, Lonnie C Commissioner BY ORDER OF THE COMMISSION jo/3.AA213 Telecopy No. (907) 276-7542 August 14, 1989 ADMINISTRATIVE APPROVAL NO. 213.25 Re: Waiver of productivity profile requirements of Rule 1i, Conservation Order No. i65 T B Gray, Manager Reservoir Surveillance BP Exploration (Alaska) Inc P. O. Box 196612 Anchorage, AK 99519-6612 Dear Mr Gray: We have received your letter of Jm%e 15, 1989 requesting a productivity profile waiver for Prudhoe Bay Unit (PBU) wells F-32 and F-35. Both wells are completed in a single zone. Since all production would necessarily enter the well from this zone, a productivity' profile would not yield additional information pertinent [o reservoir depletion. The Commission hereby waives the productivity profile required by Rule lla, Conservation Order No. 165 for PBU wells F-32 and F-35. the future, if well operations chang~ sufficiently, the =unning of a production profile "may be reconsidered. BY ORDER OF THE COF~iiSSION dlf/3.AA2i3 Telecopy No. (907) 276-7542 August 1, i989 ADMINISTRATIVE APPROVAL NO. 213.24 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 T B Gray', Manager Reservoir Surveillance BP Exploration (Alaska) Inc P 0 Box 196612 Anchorage, AK 99519-6612 Dear Mr Gray: We have received your letter of July 27, 1989 requesting a productivity profile waiver for Prudhoe Bay Unit (PBU) well W-03. The aforementioned well is a single zone completion. Since all production would necessarily enter the well from only a single zone:, a producti'vity profile would not yield additional information pertinent to reservoir d~.pletion. Therefore, the Commission hereby approves your request to waive the production profile required by Rule lla of C0165 in PBU Pad W-03 well. In the future, if well operations change sufficiently, the need for a production profile may be reconsidered by the commission. Lonnie C Smith Commissioner BY ORDER OF THE COMMISSION LCSjo/3.AA213 Telecopy No. (907) 276-7542 July 31, 1989 A D M I N I S T R A T I V E A P P R 0 V A L N O. 213.23 Re: Waiver of productivity profile requirements 'of Rule 11, Conservation Order No. 165 D F Scheve Operations Engineering ARCO Alaska Inc P O Box 100360 Anchorage, AK 99510-0360 Dear Mr Scheve: We have received your requests for waivers to Rule lla of Con- servation Order (CO) No. 165 for Prudhoe Bay Unit (PBU) wells i§-10A, 18-21 and 18-25. Ail of the aforementioned wells are single zone slotted liner completions. Since all production, would necessarily enter each well from only a single zone, a productivity profile would not yield additional information pertinent to reservoir depletion. Therefore, the Commission hereby approves your request to waive the production profile required 'by Rule lla olf CO165 in PBU wells 15-10A, 18-21 and 18-25. Itt the future, if well operations change sufficiently, the need for a production profiles from these wells may be reconsidered by the Commission. Sincerely, , Lonnie C Commissioner BY ORDER OF THE CO¥E~ISSION LCSjo/3 .AA213 Telecopy No. (907) 276-7542 July' 25, 1989 ADMINISTRATIVE APPROVAL NO. 213.22 Re: Waiver of productivity profile requirements of Rule Conservation Order No. 165 T B Gray Mgr Reservoir Surveillance BP Exploration (Alaska) Inc P 0 Box 196612 Anchorage, AK 99519-6612 Dear Mr Scheve: We have received your request of July 19, 1989 for waivers to Rule lla of Conservation Order (CO) No. 165 for Prudhoe Bay Unit (PBU) wells Z-23 and Z-26. Both of the aforementioned wells are single zone completions. Since all production would necessarily' enter each ·well from only a single zone, a productivity profile would not yield additional information pertinent to reservoir depletion. Therefore, the Commission hereby approves your request to waive the production profile required by Rule lla of CO I65 in PBU wells Z-23 and Z-26. In the future, if well operations change sufficiently, the ,, ~.need for a production profiles from these wells may be iraconsidered by ghe Commission. :h Commissioner BY ORDER OF THE COMMISSION RADdli/3.AA213 Telecopy No. (907) 276-7542 July 10, 1989 ADMINISTRATIVE APPROVAL NO. 213.21 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 D. F. Scheve, Manager Operations Engineering ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Dear Mr Scheve: We have received your request for a waiver to Rule lla of Conservation Order (CO) No. 165 for Prudhoe Bay Unit (PBU) well DS 18-1.8. The aforementioned well is a single zone slotted liner completion. Since all production would necessarily enter the well from only a single zone, a productivity profile would not yield additional information pertinent to reservoir depletion. Therefore, the Commission hereby approves your request to 'waive the production profile required by Rule ila of C0165 in..~PBU DS 18-18. In the fu~6re, if well operations change sufficiently, the need for..~a production profile from this well may be reconsidered. Sin ly, Lonnie Commissioner BY ORDER OF THE COMMISSION RADjo/3.AA213 Telecopy No. (907) 276-7542 June 21, 1989 ADMINISTRATIVE APPROVAL NO. 213.20 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 T B Gray, Manager Reservoir Surveillance BP Exploration (Alaska) Inc P 0 Box 196612 Anchorage, AK 99519-6612 Dear Mr Gray: We have received your letter of June 15, 1989 requesting a productivity profile waiver for Prudhoe Bay Unit (PBU) well Y-25. The Commission hereby waives the.~..~productivity profiles required by Rule 11, Conservation Order No. 165 for PBU well Y-25 due to the inability of conventional tools to reach the production intervals in high angle wells. In the future, if well operations change sufficiently, the running of a production profile may be reconsidered. Sincerely, '.,.-?'ionni"e Cf S~ith Commissioner BY ORDER OF 60 ZSS O jo/3.~213 June 7, i989 2elaco?y (907} 276-7542 A D £~ I N i S T R A T I V E A P P R O V A L ~ O. 213.19 Re: Waiver of productivity profile require'~nents of Rule I1, Conservation Order No. 165 T B Gray Mgr Reservoir Surveillance BP Exploration (Alaska) Inc P 0 Box 196612 f~'~chorage, AK 99519-6612 Dear Mr Gray: We have received your reques't for waivers to Rule lta of TM = {~OllS~.r V- a~ion Order (CO) No. 165 for ?rudhoe Bay ~3nit (PBU) wells W-5 and W- 21. Both of the aforementioned wells are si'n~le zone completions Since all production would necessarily enter each ~,~.ell '~: · ,~.rom only a single zone, a produc'tivity profile would not yield additional infor~lation pertinent to reservoir depletion. Therefore, the Co~nission hereby approves your reques't to waive the production profile r~.qul, red by Rule 1.ia of CO i65 in i-!~U 'wells !,I- and W-2!. , In the future, if ~,~ell operations caange sufficiently, the need for production profiles tile Co~is s ion. , Sincerely, ~onnie C S~'th Commis s loner BY ORDER OF THE COi~R{ISSION dtf/3.AA213 May 10, 1989 Telecopy No. (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.18 Re: Waiver of productivity profile requirements of RUle 11, Conservation Order No. 165 T B Gray Mgr Reservoir Surveillance BP Exploration (Alaska) Inc P 0 Box 196612 Anchorage, AK 99519-6612 Dear Mr Gray~ We have received your request for waivers to Rule lla of Conserv- ation Order (CO) No. 165 for PrudhOe Bay Unit (PBU) wells Z-24, Z-25 and Z-32. Ail of the aforementioned wells are single zone completions with. 31 feet or less of perforated interval. Since all production would necessarily enter each well from only a single zone, a productivity profi!e would not yield additional information pertinent to reservoir depletion. Therefore, the Commission hereby approves your request to waive the production profile required by Rule lla of CO 165 in PBU wells Z-24, Z-25 and Z-32. In the future, if well operations change sufficiently, the need for production profiles from these wells may be reconsidered by the Commission Commissioner ~ BY ORDER OF THE COI~MISSION dlf/3.AA213 Telecopy No. (907) 276-7542 February 22, 1989 ADMINISTRATIVE APPROVAL NO. 213.17 Re.. Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 T B Gray Mgr Reservoir Surveillance BP Exploration (Alaska) Inc P 0 Box 196612 Anchorage, AK 99519-6612 Dear Mr Gray: We have received your request for waivers to Rule lla of Conserv- ation Order (CO) No. 165 for Prudhoe Bay Unit (PBU) wells W-I, W-27, W-31, W-34, Z-14, and Z-15. Ail of the aforementioned wells are single zone completions with 50 feet or less of perforated interval. Since all production would necessarily enter each well from only a single zone, a productivity profile would not yield additional information pertinent to reservoir depletion. Therefore, the Commission hereby approves your request to waive the production profile required by Rule lla of CO 165 in PBU wells W-I, W-27, W-31,~ Z-14, and Z-15. In the future, if wgll operations change sufficiently,,~the running of a production ~rofile may be reconsidered. BY ORDER OF THE COM~4ISSION jo/3 .AA213 Telecopy No. (907) 276-7542 January 26, 1989 ADMINISTRATIVE APPROVAL NO. 213.16 Res Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 D F S cheve Operations Engineering Mgr ARCO Alaska, Inc P O Box 100360 Anchorage, AK 99510-0360 Dear Mr Scheve: We have received your request for waivers to Rule lla of Conser- vation Order (CO) No. 165 for Prudhoe Bay Unit (PBU) wells 18-13 a'~-~d 18-!6. Both DS 18-13 and DS 18-16 are perforated only in Zone 1. Since all production would necessarily enter the well from this zone, a productivity profile would not yield information pertinent to reservoir depletion, Therefore, the Commission hereby approves your request to waive the production profile required by Rule lla of CO 1.65 in PBU wells DS 18-13 and DS 18-]6. In the future, if well operations change sufficiently', the running of a 'production profile may be reconsidered. Sincerely, Chairman ' ~' BY ORDER OF THE COMMISSION jo/3.AA213 Telecopy ~o. (907) 276-7542 October 24, 1988 ADMINISTRATIVE APPROVAL NO. 213.15 Re: Waiver of productivity profile requirements of Rule 11, Conservation Order No. 165 T N Tyler, Manager Reservoir Surveillance Standard Alaska Production Company P 0 Box 196612 Anchorage, AK 99519-6612 Dear Mr Tyler: By letter dated October 13, 1988, you 'requested productivity profile waivers for Prudhoe Bay Unit wells H-23, H-29, and H-30. The survey in question is required by Rule lla of Conservation Order (CO) 165. All three wells are completed in a single interval of 22, 33, and 16 feet respectively. A productivity profile run under these conditions would not Yield additional information concerning reservoir depletion. Therefore, the Commis. sio~ hereby approves your request to waive ~the production profile required by Rule lla of CO 165 in Prudhoe Bay Unit wells H-23, H-29, and H-30. In the future, if well operations change sufficiently, the running of a production profile may be reconsidered. Commissioner BY O?~DER OF THE COMMISSION jo/3.AA2i3 Teiecopy No. (907) 276-7542 June 22, 1988 ADMINISTRATIVE APPROVAL NO. 213.14 Re: Waiver of productivity profile requirements of Rule 11 Order No. 165 T. N. Tyler, Manager Reservoir Surveillance Standard Alaska Production Company P. O. Box 196612 Anchorage, AK 99519-6612 Dear Tyler By letter dated June 17, 1988, productivity, profile requirements for two new high angle wellbore Prudhoe Bay Unit wells, E-25 and E28, were requested to be waived. The productivity profile survey is required by Rule ll(a) of Conservation Order No. 165. You stated that you are presently closely monitoring the produc- tion behavior of wells E-25 and E-28 and do not believe the value of the information obtained by surveys would ~justify the costs and risk involved at this time. Therefore, the Commission approves your request to waive the production profile required by Rule ll(a) of Conservation Order 165 in Prudhoe Bay Unit wells E-25 and E-28. In the future, if production characteristics change sufficiently to warrant some kind of remedial work, the running of these production logs will be reconsidered, / Lonnie C Smith Commissioner BY ORDER OF THE COMMISSION dlf/3.AA213 Telecopy No. (907) 276-7542 February 4, 1988 A D M I N I S T R A T I V E A P P R 0 V A L N O. 213.13 Re: Injection profile waiver, Rule lla, Conservation Order No. 165 D F Scheve Operations Engineering Manager ARCO Alaska, Inc P 0 Box 100360 Anchorage, AK 99510-0360 Dear Mr Scheve: By letter dated January 29, 1988, you requested a waiver to Rule lla of Conservation Order (CO) No. 165 for Prudhoe Bay Unit (PBU) well DS 11-26. DS 11-26 is producing from ~37' of perforations in..Zone lB ~of the Sadlerochit Formation. Since all production would necessarily enter the well from 'this zone, a productivity profile as required by Rule lla of C0165 is not needed. Therefore, the Commission approves your request to waive the production profile required by Rule lla of C0165 in PBU well DS 11-26. When additional zones are perforated in the well and produced concurrently with the lB zone then a productivity profile will .b'e required. S zn. ~g~ere ly ,/'~ / ,. .... ~/~.~, .,., .,..,.,..4' "~-Yx,~'~ '" Lonnie C Smith Commis s ioner ,' BY ORDER OF THE COMMISSION jo/3.AA213 Te!ecopy No. (907) 276-7542 January 25, 1988 ADMINISTRATIVE APPROVAL NO. 213.12 Re: Waiver to Rule 11 of Conservation Order No. 165 D F Scheve Operations Engineering Manager ARCO Alaska, Inc P O Box 100360 Anchorage, AK 99510-0360 Dear Mr Scheve: By correspondence dated January 1, 1988, productivity profile requirements on Prudhoe Bay Unit wells DS 4-20, DS 4-23, 'and DS 4-29 were requested to be waived. The profile survey is required by Rule ].la of Conservation Order No. 165. All of the wells are single zone completions which precludes the need for a productivity profile. Therefore, the Commission hereby approves your request to waive the Production profile required by Rule 1Ia of Conservation Order No. 165 in Prudhoe Bay Unit wells DS 4-20, DS 4-23, and DS 4-29. Should additional zones be brought on production in conjunction with the original interval, a subsequent profile survey will be required. Lonnie C "Smith Co~issioner BY ORDER OF THE CO~@IISSION jo/3.AA213 Telecopy No. (907) 276-7542 November ]6, 1987 ADMINISTRATIVE APPROVAL NO. 213.11 Re: Waivers to Rule l la of Conservation Order No. 165 for Prudhoe Bay Unit .wells DS 18-9, DS ]8-14 and DS 18-]9. D F S cheve Operations Engineering Manager ARCO Alaska, Inc P 0 Box 100360 Anchorage, AK 99510-0360 Dear Mr Scheve: By application dated November'10, 1987, on behalf of ARCO Alaska, Inc, you requested a waiver to Rule lla, Conservation Order No. 165 for Prudhoe Bay Unit wells DS 18-9, DS 18-14, and DS 18-19. These wells are producing from only one interval in zone 1. Since all flow would necessarily enter from this zone, a productivity profile as required by Rule /la of Conservation Order No. ]65 is not needed until additional zones may be perforated. Therefore, under authority of Rule 2 of Conservation Order No.. 213 the Commission hereby waives the requirement of Rule lla of Conservation Order No. 165 for Prudhoe Bay Unit wells DS 18-9, DS 18-14, and DS 18-19. Sincerely, ~ W W Barnwell Commissioner BY ORDER OF THE COMMISSION jo/3.AA213 · Telecopy No. (907) 276-7542 August 11, 1987 ADMINISTRATIVE APPROVAL NO. 213.10 Re: Waivers to Rule lla of Conservation Order No. 165 for Prudhoe Bay Unit well DS 4-26. D. F. Scheve Operations Engineering Manager ARCO Alaska., Inc.. P. O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: By application dated August 7, 1987, on behalf of ARCO Alaska, Inc., you requested a waiver to Rule lla, Conservation Order No. 165 for Prudhoe Bay Unit well DS 4-26. The well is producing from 20 feet or less of perforations, and all perforations are in zone lB. Since all flow would necessarily enter from this zone, a productivity profile as required by Rule lla of Conservation Order No. 165 is not needed until additional zones may be perforated. Therefore, under authority of Rule 2 of Conservation Order No. 213 the Commission hereby waives the requirement of Rule lla of Conservation Order No. 165 for Prudhoe Bay Unit well DS 4-26. BY ORDER OF THE COMMISSION jo/3.AA213 Te!ecopy No. (907) 276-7542 June 1, 1987 ADMINISTRATIVE APPROVAL NO. 213.9 Re: Waivers to Rule lla of Conservation Order No. 165 for Prudhoe Bay Unit.wells DS 11-16, DS 11-17, DS 1]-i8 and DS 11-23. Mr. D. F. Scheve Operations Engineering Manager ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360' Dear Mr. Scheve: By application dated May 24, 1987, on behalf of ARCO Alaska, Inc., you requested waivers to Rule lla, Conservation Order No. 165 for Prudhoe Bay Unit wells DS 11-16, DS 11-17, DS ]1-18 and DS ]1-23. These wells are producing from 47 feet or less of perforations, and all perforations are in zone lB. Since all flow would necessarily enter from this Mone, a productivity profile as required by Rule lla of Conservation Order No. 165 is not needed until additional zones may be perforated. Therefore, under authority of Rule 2 of COnservation Order No. 213 the Commission hereby waives the requirement of Rule lla of Conservation Order No. 165 for Prudhoe Bay Unit wells DS 11-16, DS 11-17, DS 11-18 and DS 11-23. BY ORDER OF THE COMMISSION jo/3.AA213 Telecopy ~'o. (907) 276-7542 February 26, 1987 A D M I N I S T R A T.I V E A P P R O V A L N O. 213.8 Re: Waive production profile required by Conservation Order No. 165, Rule lla, for Prudhoe Bay Unit (PBU) well DS 16-24 Mr. D. F. S cheve Operations Engineering Manager ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: By. letter dated February 24, 1987, on behalf of ARCO Alaska, Inc., you requested a waiver to Rule lla of Conservation Order No. 165 for PBU well DS 16-24. PBU well DS 16-24 is currently perforated over a 54' interval which is located entirely in the Tango interval. A production profile would not disclose additional information regarding production from the lithologic subdivisions of the Prudhoe Oil Pool until other intervals are open to production. Therefore, the productivity profile required by Conservation Order No. 165, Rule lla, is hereby waived. Lonnie C. Smith Commissioner BY ORDER OF THE COMMISSION jo/3.AA213 February 20, ]987 Telecopy No. (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.7 Re: Productivity profile waivers Prudhoe Bay Unit (PBU) wells B-26, B-28, F-23 and G-23. Mr. T. N. Tyler, Manager Reservoir Operations & Production Engineering Standard Alaska Production Company P. O.. Box 196612 Anchorage, AK 99519-6612 Dear Mr Tyler: .. We have received your lette'r of February 13, 1987 requesting productivity, profile waivers for PBU wells B-26, B-28, F-23 and G-23. The Commission hereby waives .the productivity profiles of PBU wells F-23 and G-23 due to the inability of conventional tools to reach the production intervals in these high angle wells. The productivity profile in PBU well B-28 is hereby waived as the well is producing from only one interval, and the survey:Would not provide additional data. The p~oduction profile required, in PBU well B-26 is hereby postponed until after a scheduled gas shut-off has been :performed. S in~..~ere ly, _.,>'" ,,~": ~: ~' . t ........ :'"- ...... ',(.D...'"'""" .... Lonnie C. Smith Commissioner .,. BY ORDER OF THE COMMISSION jo/3.AA213 November 26, 1986 Telecopy No. (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.6 Re: ARCO Alaska, Inc. request to waive production profile for Prudhoe Bay Unit (PBU) well DS 9-34. Mr. D. F. Scheve Operations Engineering Manager ARCO Alaska, Inc. P. O.'Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: By letter dated November 24, 1986, ARCO Alaska, Inc. has requested waiver of the productivity profile required by Conservation Order 165, as amended by Conservation Order 213, in PBU well DS 9-34. The Con~nission has revieWed the need for a productivity profile in PBU well DS 9-34, and has determined that since the well is only perforated, in a single zone, a profile would not yield any additional information necessary for proper monitoring of the Prudhoe Oil Pool performance. Therefore, by administrative approval authorized by Conservation. Order 213, Rule 2, the Commission waives the productivity profile requirement in PBU well DS 9-34. Sincerely, Lonnie C. ~Smith Commissioner j o/3. ~21 .. . ' November 13, 1986 Telecopy (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.5 Re: Waiver to rule 11 of Conservation Order 165 for Prudhoe Bay Unit (PBU) wells 4-22 and 4-28. Mr. D. F. Scheve ARCO Alaska, Inc. P. O. Box 100360 A~chorage, AK 99510-0360 Dear Mr. Scheve: You have requested waivers to rule lla of C.O. 165 for PBU wells 4-22 and 4-28 by Application for Sundry ApproVals dated Novem- ber 5, 1986. These wells are producing from less than 30 feet of perforations. In each case the perforations are contained in a single zone. Therefore a productivity profile is not necessary to determine well flow from different zones. The Commission hereby approves your request to waive the pro- duction profile required by rule lla of C.O. 165 in PBU wells 4-22 and 4-28. Sincerely Lonnie C. ~mith Commissioner BY ORDER OF THE COMM~ISSION dlf/3.AA213.5 October 28, 1986 Telecopy No. (907) 276-7542 A D M I N I S T R A T I V E lA P P R 0 V A L N O. 213.4 Re: Waivers to Rules 6 and 11 of Conservation Order 165. Mr. D. F. Scheve ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: By letter dated October 21, 1986, waivers to Rules 6 and 11 of Conservation Order 165, as amended by Conservation Order No. 213,. were requested for DS 4-18, 4-21, 4-24 and 4-27. These wells are currently on a rotating production schedule. They are produced for 7 or 8 days, and are shut in for 20 or 21 days. A static pressure survey is proposed to be taken at the end of a shut in period in these wells to satisfy the pressure survey requirement in Rule 6b of CO 165. Static .surveys in these instances will yield an accurate measurement of reservoir pressure. Therefore, substitution of a static survey for the transient survey required in Rule 6b of CO 165 is hereby approved for Prudhoe Bay Unit wells DS 4-18, 4-21, 4-24 and 4-27. These wells are producing from 55 feet or less of perforations. All perforations are in zone la.. Since all flow would necessarily enter from this zone, a productivity profile as required by Rule lla of CO 165 is not needed. Therefore, the Commission approves your request to waive the production profile required by Rule lla of CO 165 on Prudhoe Bay Unit wells DS 4-18, 4-21, 4-2.4 and 4-27. -C. V. Ct~anner~on Chairman jo/3.AA213.4 Telecopy No. (907) 276-7542 October !0, 1986 ADMINISTRATIVE APPROVAL NO. 213.3 Re: Waivers to Rule g of Conservation Order 165. Mr. D. F. Scheve ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: By form 10-403 applications dated OctOber 1, 1986, waivers to Rule 6(b) of Conservation Order 165, as amended by Conservation Order 213, were requested for Prudhoe Bay Unit (PBU) wells 3-31, 3-32 and 3-33. These three wells have been shut-in for approximately one month. A static pressure survey run in each well will yield an accurate measurement of reservoir pressure. Therefore, substitution of a static survey for the transient survey required by Rule 6(b) of Conservation Order 165 is hereby approved for PBU wells 3-31, 3-32 and 3-33. Sincerely ,. Lonnie C. Smith Commissioner jo/3.AA213.3 September 29, 1986 Telecopy No. (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.2 Re: Waivers to Rule 6 and Rule 11 of Conservation Order 165. Mr. D. F. S cheve ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: By letter dated September 24, 1986, waivers to Rule 6 and Rule 11 of ConserVation Order 165, as amended by Conservation Order 213, were requested for DS 11-9. Prudhoe Bay Unit DS 11-9 has been shut-in since May; 1986~ and conversion to water injection is pending. Since the well is shut-in, a transient pressure survey is not prudent. A static pressure survey will yield an accurate measurement of reservoir' pressure. Therefore, substitution of a static survey for the transient survey required, in Rule 6(b) of Conservation Order 165 is hereby approved. In addition to being shut-in, the well is only completed in the Lower Romeo. Since all flow would necessarily come only from the Lower Romeo, a spinner survey is not needed to determine this. Therefore, the Commission approves your request to waive the production profile required by Rule ll(a) of Conservation Order 165. Sincerely, Lonnie C. Smith ,~CommissiOner jo/3.AA213.2 September 29, 1986 Telecopy No. (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.1 Re: Standard Alaska Production Company request to waive productivity pro£iles, Prudhoe Bay Unit wells JX-2, B-30, Y-20, G-29, G-27, Y-21. Mr. T. N. Tyler Manager Reservoir Operations Standard Alaska Production Company P. O. Box 196612 Anchorage, AK 99519-6612 Dear Mr. Tyler By letter dated'September 24, 1986, Standard Alaska Production Company has requested waivers of productivity profiles required by Conservation Order 165, as amended by Conservation Order No. 213, in wells JX-2, B-30, Y-20, G-29, G-27 and Y-21. The Alaska Oil and Gas Conservation Commission has reviewed the need for productivity profiles in these wells. The Commission has determined that these data are not necessary for proper monitoring of the Prudhoe Oil Pool performance. Therefore, by administrative approval authorized by Conservation Order 213, Rule 2, the Commission waives productivity profile requirements in Prudhoe Bay Unit wells JX-2, B-30, Y-20, G-29, G-27 and Y-21. Sincerely, /'-'~ Lonnie C. Smith Commissioner jo/3.AA213 d ARCO Alaska, Inc. Post Office Box ,u0360 Anchorage Alaska 99510-0360 Telephone 907 276 1215 April 20, 1993 ~ zJ~.q o D. W. Johnston Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Request for Waiver to Rule 11 (a), Conservation Order 165 Dear Mr. Johnston: The operators of the Prudhoe Bay Unit, BP Exploration, Inc. and ARCO Alaska, Inc., request a waiver to the above referenced conservation order for specific circumstances as defined in this letter. We consider that this change will result in more efficient productivity logging in the field through increased operator flexibility to eliminate logs which will not provide useful information, and this change will reduce paperwork associated with individual well waiver requests. Conservation Order 165, Rule 11 (a) states: "A spinner flow meter or tracer survey shall be run in each new well during the first six months the well is on production." We request a waiver to this requirement for wells with specific types of completions under Conservation Order 213, Rule 2, which provides authority to grant administrative waivers to C.O. 165, Rule 11. The primary purpose of Rule 11 was to provide information to assess the effectiveness of well completions to drain the reservoir and to provide baseline surveys for comparison to later logs. Past experience indicates that these initial productivity profiles do not yield significant additional information for this purpose in new wells completed 1) with a single perforated interval, or 2) with perforations in a single reservoir zone. Wells in this second category would include nearly all highly deviated wells, those that exceed 65 degrees from vertical and in many cases are nearly horizontal within a single zone. Individual waivers to this requirement are currently requested for new wells with these types of completions. ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company REEEIVED Alaska Oil & Gas Cons, GommiSS':o~'~ Anchorage D. W. dohnstoi April 20, 1993 Page 2 If you require additional information, please call Mike Bill at 263-4254 or Marc Hombrook at 564-5704. Sincerely, D. F. Scheve Manager PB Operations Engineering ARCO Alaska, Inc. C. J. Phillips Manager PB Petroleum Engineering BP Exploration (Alaska) Inc. CC: M. L. Bill, ARCO Alaska, Inc. R. E Bremer, Exxon Company, U. S. A. M. Hornbrook, BP Exploration (Alaska) Inc. RECEIVED Alaska Oil & Gas Cons. Commission' Anchorage ARCO Alaska, Inc. [ Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager December 14, 1992 SR ENG ENG ASST~ SR GEOL GEOL ASST GEOL ASST .... 3TAT TECH ...................... STAT TECH ~ILE Mr. D. W. Johnston Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Request for Waiver to: Rule 9 (a), Conservation Order 165 Dear Mr. Johnston: ARCO Alaska, Inc. requests a waiver of this rule for the wells listed below. The rule pertains to gas-oil contact monitoring and states: "Prior to initial sustained production, a cased or open hole neutron log shall be run in each well." In reviewing our records, we have discovered that the neutron logs required by this rule were not obtained in thirteen recent new wells and sidetracks. All of these wells are located within waterflood/EOR project areas where no gas-oil contact movement issues exist. Therefore, a neutron log at these locations would not yield additional information pertinent to reservoir depletion. Well Month Well Type 04-14A 10/92 12-06A 6/92 12-10A 10/92 12-14ST 7/92 16-28 7/92 16-29A 7/92 16-30 9/92 16-31 8/92 17-15 10/92 17-16 9/92 17-19 10/92 17-20 11/92 17-21 12/92 Injection Well Sidetrack Producer Sidetrack Producer Sidetrack Producer Sidetrack New Producing Well New Producing Well New Producing Well New Producing Well Future Injection Well New Producing Well New Producing Well New Producing Well New Producing Well REEEIVED DEC 1 6 1992 Alaska 0il & Gas Cons. uommiss%on Anchorage ARCO Alaska, Inc. is ,~ Subsidiary of AtlanticRIchfieldCompany AR3B--6132-C Mr. D. W. J oht-_ on December 14, 1992 Page 2 If you require additional information, please do not hesitate to call. Sincerely, Donald F. Seheve MLB/052 RE EIV£D DEC 1 6 199~ Alaska Oil & Gas 0ohs. (;ommissio~ Anchorage ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 29, 1992 Mr. D. W. Johnston Alaska Oil and Gas Conservation Commissioner 3001 Porcupine Drive Anchorage, AK 99501 ' E--~--G-ASST _!_ t GEOL AS~ ~ ii'~'~ Re: Conservation Order 165, Rule 1 lA - Waiver for Specific Wells Dear Mr. Johnston: ARCO Alaska, Inc. requests a waiver of Conservation Order 165, Rule 1 lA for the wells listed below. (The rule pertains to the requirement of obtaining initial production profiles on new wells.) These wells have only one perforation interval in one zone or are nearly horizontal through only one zone (high angle well-HAW).' Therefore, a production profile would not yield additional information pertinent to reservoir depletion. Perforations or Well Slotted Liner PBU Name APl # Well _Type Interval {'MD) Zone DS 2-33 50-029-22214 Conventional 9226'-9242' 1 DS 2-34 50-029-22234 HAW 10421-11368 1 DS 2-35 50-029-22222 HAW 9849-10761 1 DS 5-20 50-029-22137 HAW 9265-10385 1 DS 5-22 50-029-21976 HAW 9866-11242 1 DS 5-30 50-029-22213 HAW 10733-12000 1 DS 5-31 50-029-22159 Conventional 9680-9700 1 DS 5-32 50-029-22190 Conventional 9910-9934 1 DS 15-23 50-029-22225 HAW 10324-11229 1 DS 15-24 50-029-22223 Conventional 9068-9086 1 DS 15-26 50-029-22235 HAW 10244-11525 1 DS 15-27 50-029-22243 HAW 10446-11274 i If you have any questions concerning this waiver request, please contact me at (907) 265-6324. Mark O. Johnson //' Sr. Operations/AnalYt~/t~egl Engineer RECEIVED Alaska 0il & Gas Cons, .C.o.m. ~iss'tot~ ~nchorag~ ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ARCO Alaska, Inc. i Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 24, 1992 Mr. D. W. Johnston Alaska Off and Gas Conservation Commission .3001 Porcupine Drive Anchorage, AK 99501 Re: DS 4-34A Permit No. 92-08 API No. 50-029-22160-01 DS 4-36 Permit No. 91-57 APl No. 50-029-22162-00 DS 4-39 Permit No. 91-77 API No. 50-029-22181-00 Dear Mr. Johnston: ARCO Alaska, Inc. requests waivers on DS 4-34A, DS 4-36, and DS 4-39 to Conservation Order 165, Rule 1 lA, which pertains to the requirement of obtaining initial production profiles on new wells. Each of these wells is drilled and completed in one producing reservoir interval only. Production profiles on these wells would not provide any additional production information at the present time. If yOu have any questions pertaining to this waiver request, please contact T. C. Collier at (907) 263-4290. Sincerely, Daniel d. Caffrey FS 2 Regional Engineer I ECEIVED APR 2 1992 Alaska Oil & Gas Cons, Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany Mr. D. W. Johnston April 24, 1992 Page 2 bcc: Files: James Bennett, BP Exploration, Anchorage T. C. Collier, ATO 1507 PI(DS 4-34A)W1-1 Pi(DS 4-36)W1-1 P1 (DS 4-39)Wl- 1 ARCO Alaska, Inc. t'1 Post Office Bt,.. 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 September 24, 1991 Mr. D. W. Johnston Alaska Oil and Gas Conservation Commissioner 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 9-44 Permit No. 90-126 API No. 50-029-22087 Dear Mr. Johnston: ARCO Alaska, Inc. requests a waiver on DS 9-44 to Conservation Order 165, Rule 11A, which pertains to the requirement of obtaining initial production profiles on new wells. PBU 9-44 is a new well that was perforated in Zone I to encourage production from this interval. Since there is only one perforated interval and a temperature log has confirmed no cement channel, all production is from that interval. ARCO Alaska, Inc. requests a waiver of Conservation Order 165, Rule 11A for this well until planned additional perforations are performed. If you have any questions pertaining to this waiver request, please contact Greg S. Sanders at (907) 265-6856. Sincerely, Sr. Area Operations Engineer LI~:RD:lap cc: James Bennett, BP Exploration, Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B-.6003-C; ARCO Alaska, Inc. ~ Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 September 24, 1991 Mr. D. W. Johnston Alaska Oil and Gas Conservation Commissioner 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 9-39 Permit No. 91-12 API No. 50-029-22133 Dear Mr. Johnston: ARCO Alaska, Inc. requests a waiver on DS 9-39 to Conservation Order 165, Rule 11A, which pertains to the requirement of obtaining initial injection profiles on new wells. DS 9-39 is a new well that was perforated (11210' to11250', BHC 3/31/91) in Zone 2 only. Due to the fact that only one zone is being injected and all of the injection is attributed to the perforations in that zone, ARCO Alaska, Inc. requests a waiver of Conservation Order 165, Rule 1 lA for this well. If you have any questions pertaining to this waiver request, please contact Greg S. Sanders at (907) 265-6856. Sincerely, Lamar L. Gantt Sr. Area Operations Engineer RECEIVED OCT o I lgg! Alaska Oil & Gas Cons. A~cfl0rage cc: James Bennett, BP Exploration, AnchOrage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3i~-6003-(~ ARCO Alaska, Inc.~'~, Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 September 24, 1991 Mr. D. W. Johnston Alaska Oil and Gas Conservation Commissioner 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 9-47 Permit No. 90-146 API No. 50-029-22098 Dear Mr. Johnston: ARCO Alaska, Inc. requests a waiver on DS 9-47 to Conservation Order 165, Rule 11A, which pertains to the requirement of obtaining initial production profiles on new wells. PBU 9-47 is a new well that was perforated and fractured in Zone I to encourage production from this interval. The frac is still being evaluated, after which Zone i additional perforations will be shot. ARCO Alaska, Inc. requests a waiver of Conservation Order 165, Rule 11A for this well until these perforations are performed. If you have any questions pertaining to this waiver request, please contact Greg S. Sanders at (907) 265-6856. Sincerely, Lamar L. Gantt Sr. Area Operations Engineer LLG:RD:lap OCT o [ ]99I 4/aska Oil & Gas Cons. C..o_m~i~[~r Anchorage cc: James Bennett, BP Exploration, Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B-6003-G ARCO Alaska, InC. l~ Post Office 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 September 24, 1991 Mr. D. W. Johnston Alaska Oil and Gas Conservation Commissioner 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 9-42 Permit No. 90-82 API No. 50-029-22059 Dear Mr. Johnston: ARCO Alaska, Inc. requests a waiver on DS 9-42 to Conservation Order 165, Rule 11A, which pertains to the requirement of obtaining initial production profiles on new wells. PBU 9-42 is a new well that was perforated in Zone i only. Low, unstable produCtion rates following a fracture stimulation have reduced the value of a spinner survey at this time. ARCO Alaska, Inc. requests a waiver of Conservation Order 165, Rule 1 lA for this well until stable rates can be established through remedial wellwork. If you have any questions pertaining to this waiver request, please contact Greg S. Sanders at (907) 265-6856. Sincerely, Sr. Area Operations Engineer IZG:RD:lap cc: J~es Bennett, BP E~lora~on, ~chorage ' ~C~0~ '., ~ ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B-6003-C ARCO Alaska, In{~' Prudhoe B~y Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager June 29, 1990 Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Re: DS 18-23 Permit No. 88-151 ,213.3o Dear Mr. Chatterton' Attached is a petition to seek a waiver to Conservation Order 165, Rule 11A which pertains to the requirement of obtaining initial production profiles on new wells. PBU 18-23 is a new well completed only in Zone 1 of the Sadlerochit Formation, with a single 10' set of perforations at the bottom of the zone. Therefore, ARCO Alaska, Inc. requests a waiver of Conservation Order 165, Rule 11A for PBU 18-23. If you have any questions pertaining to this waiver request, feel free to contact R. E. Alexander at (907) 263-4372. Very truly yours, D. F. Scheve RAE/006/cdw Attachment cc: James Bennett, BP Exploration, Anchorage File: PI(DS18-23)W1-1 Atlch0rafl~ ARCO Alaska, Inc. is a Subsidiary of AtlanticRIchfieldCompany AR3B--6132-(~ DRILL SITE 18-23 ARCO Alaska, Inc. requests the following' Permission to waive the production profile requirement as prescribed in Conservation Order 165, Rule 11A. The reason for requesting this waiver is the well is completed only within Zone One of the Sadlerochit Formation, with a single 10' set of perforations at the bottom of the zone. BP EXPLORATION January 10, 1990 C. V. Chatterton, Chairman Oil and Gas Conservation Commission State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 i. BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Dear Mr. Chatterton, BP Exploration is requesting administrative approval to waive productivity profile requirement for well F-34. .. This well has only one perforation interval (10170-10185' MD). The value of obtaining a productivity profile survey is limited. We are closely monitoring the performance of this well. If production characteristics change sufficiently to warrant remedial work, we would obtain the necessary production logs at that time. Should you require further information, please contact R. B. Frazier at (907) 564- 4556. V e~ truly yours, T. B. Gray~ Rese~oir Su~eillance TBG:TQN:tqn cc: R. E. MacDougal (Exxon) L. J. Sennett (ARCo) RECE VED BP EXPLORATION C. V. Chatterton, Chairman Oil and Gas Conservation Commission State of Alaska 3001 Porcupine Drive Anchorage, Ak. 99501 Dear Mr. Chatterton' BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 (907)Anchorage'561-5111 Alaska 99519-6612 October 11, 1989 BP Exploration is requesting administrative approval, as outlined on Conservation Order No. 213, Rule 2, to waive productivity profile requirements for Well Z-29 perforated in one single interval' 11870'-11940' MD BKB (51.3' TVD) The value of obtaining a production profile in this wellbore would be limited. We plan to monitor the production behavior of this well constantly. If production characteristics change sufficiently to warrant some kind of remedial work, we would obtain any required production logs at that time. If you require further information, please contact S. L. Bryant at (907) 564-4203. Very truly yours, T.-"BTG r~.y, Manager, Reservoir Surveillance TBG:OEI:dmh CC: R.E. MacDougal (Exxon) D.F. Scheve (ARCo) D.D. Smith (ARCo) R.E. 6.1 ARCO Alaska, Inc.. " Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re' DS 18-18 Permit No. 88-113 Dear Mr. Chatterton: Attached is a petition to seek a waiver to Conservation Order 165, Rule llA which pertains to the requirement of obtaining initial production profiles on new wells. PBU DS 18-18 is a new "high angle" well and is completed with a 4-1/2" slotted liner from 10338-11482' MD (39'ss). However, this interval penetrates only Zone 1 within the Sadlerochit formation. Because this well penetrates only one zone and obtaining the production profile on this well will require using a coil tubing unit, ARCO requests a waiver of Conservation Order 165, Rule 11 A for PBU DS 18-18. If the GOR in this well increases in the future, then a CTU conveyed production profile will be executed for diagnostic purposes. If you have any questions pertaining to this waiver request, feel free to contact C. K. Hurst at (907) 263-4354. Very truly yours, D. F. Scheve DFS/MKM 62089/nmb Attachment cc' T.B. Gray, BP Exploration RE.'CEIVED Alaska Oil & Gas Cons. Cor~t~ssio~ Anci,~orage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C BP EXPLORATION February 13, 1989 C. V. Chatterton, Chairman Oil and Gas Conservation Commission State of Alaska 3001 Porcupine Drive Anchorage, Ak. 99501 ,~-.~, : t~,.,~', P E 'n ' · ~,~ 900 East Be son Boulevard ~'~)\'~' ,~ P.O. BOX 196612 Anchorage, Alaska 99519-661; (907) 561-5111 COMM COMB COMM RES ENG ~ ENG SR I~NG ~ GEOL~ ~L %E~SST ,~¢~ C H~A~FILE Dear Mr. Chatterton' BP Exploration is requesting administrative approval, as outlined on Conservation Order No. 213, Rule 2, to waive productivity profile requirements for six new wells. A waiver is requested for the following wells perforated in one single interval: Z-14 (24' TVD), Z-15 (38' TVD), W-01 (50' TVD), W-27 (39' TVD), W-34 (29' TVD), and W-31 (26' TVD). In these cases, the value of obtaining a production profile would be limited. We are monitoring the production behavior of these wells. If production characteristics change sufficiently to warrant some kind of remedial work, we would obtain any required production logs at that time. If you require further information, please contact S. L. Bryant at (907) 564-4203. Very truly yours, Reservoir Surveillance TBG:DMH:dmh CC: R.E. MacDougal (Exxon) D.D. Smith (ARCo) R.E. 6.1 RECEIVED F£8 16 1989 Alaska 0tl & Gas C_~D=, COmmission Anchorage C. V. Chatterton Productivity Profile Waivers For wells Z-14, Z-15, W-01, W-27, W-34 ~,nd W-31 Distribution bcc: J. A. Bragg J. T. Brown S. L. Bryant ~ C. E. Drysdale V. W. Holt B. J. Policky P. B. Reservoir Engineer P. B. Production Engr. Supv. Well files Standard Alaska Production Company ,~ 900 East Benson Boule,~. P.O. Box 196612 Anchorage, Alaska 99519-6612 (9071 561-5111 Mr. C. V. Chatterton, Chairman Oil and Gas Conservation Commission State of Alaska 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: February 13, 1987 : · .:..,,.~:~ ~:',_~___LL_i <~ ::! STANDARD : ,--~'i~L ,. ~'~ Standard Alaska Production ComPany is requesting administrative aPProval, as outlined in COnservation order lqo. 213, Rule 2, to waive required productivity profiles for high angle wells F-23 and G-23. The high angle deviation of these wellbores prevents conventional wireline conveyed logging tools from reaching the producing intervals. We also request your approval to waive the productivity profile requirement for Well B-28, and to extend the productivity profile time period for Well B-26 until after a programmed gas shut-off workover is completed. Well B-28 is producing from a 25 ft., homogeneous, single zone interval and a productivity profile would not provide useful information in this particular cicumstance. Well B-26 is currently producing with high gas/oil ratios and has a near future gas shut-off workover planned to return the well to solution gas/oil ratio production. For this case, we feel that a post workover productivity profile will be more meaningful than one influenced by gas jetting form perforations that will shortly be shut-off. If you require further information to support these requests, please contact P. F. Barth at (907) 564-4629. TNT:GN:slh RE 6.1 RE 6.7 5783m A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870, Very truly yours, x T. lq. Tyler, Manager, Reservoir Operations and Production Engineering. Gas Cor:s. Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Re: THE APPLICATION OF ARCO ) ALASKA, INC. AND STANDARD ) ALASKA PRODUCTION COMPANY ) to revise pressure survey ) rules in Conservation ) Orders 165, 208 and 213 ) Conservation Order No. 220 Prudhoe Oil Pool Prudhoe Bay Field November 3, 1986 IT APPEARING THAT: · Arco Alaska, Inc. and Standard Alaska Production Company requested changes to pressure survey rules in Conservation Orders 165, 208 and 213 by letter dated September 26, 1986. · Notice of an opportunity for public hearing on November 6, 1986 was published in the Anchorage Daily News on October 4, 1986. · There was no protest to the proposed changes filed with the Commission. NOW, THEREFORE, IT IS ORDERED THAT Conservation Orders 165, 208 and 213 be amended to read as follows: RULE 1. Conservation Order 165, Rule 6a, is amended to read: Prior to regular production, a static bottomhole or transient pressure survey shall be taken on each well. RULE 2. Conservation Order 165, Rule 6b, is amended to read: Within the first twelve (12) months following regular production from a well, a static bottomhole or transient pressure survey shall be taken on the well. RULE 3. Conservation Order 165, Rule 6e and 6g, are repealed. RULE 4. Conservation Order 208, Rule 1, Rule 2 and Rule 3, are repealed. Conservation Ord~e~ No. 220 November 3, 1986 Page 2 RULE 5. Conservation Order 213, Rule 1, is amended to read: By administrative approval the Commission may grant time extensions and waive requirements of this order, and by administrative order the Commission may require additional pressure surveys in Rule 3 of this order. BE IT FURTHER ORDERED THAT: RULE 6. A minimum of 95 and 87 static bottomhole or transient pressure surveys shall be run annually in the Western Operating Area and Eastern Operating Area, respectively. These surveys are needed to effectively monitor reservoir pressure in the Prudhoe Oil Pool. The surveys required in Rules 1 and 2 of this order may be used to fulfill the minimum requirements. RULE 7. Data from the surveys required in Rules 1, 2 and 6 of thi's' order shall be filed with the Commission by the last day of the month following the month in which each survey is taken. Form 10-412, Reservoir Pressure Report, shall be used to report the data from these surveys. Data submitted shall include rate, pressure, time, depths, temperature and any well condition necessary for complete analysis of each survey. The datum for the pressure surveys is 8800 feet subsea. Transient pressure surveys obtained by a shut in buildup test, an injection well pressure fall-off test, a multi-rate test or an interference test are acceptable. Other quantitative methods may be administra- tively approved by the Commission. RULE 8. Results and data from any special reservoir pressure monitoring techniques, tests, or surveys shall also be submitted as prescribed in Rule 7 of this order. DONE at Anchorage, Alaska and dated November 3, 1986. ~a~s~aCOha~te~rt~,/Ch~airman'' i annas Conservation Commission W. W. Barnwell, Commissioner Alaska Oil and Gas Conservation Commission ALASKA OIL AND GAS CONSERVATION COMMISSION September 29, 1986 Bill Sheffield, Governor 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 TELEPHONE (907) 279-1~333 Telecopy No. (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.2 Re: Waivers to Rule 6 and Rule 11 of Conservation Order 165. Mr. D. F. S cheve ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: By letter dated September 24, 1986, waivers to Rule 6 and Rule 11 of Conservation Order 165, as amended by Conservation Order 213, were requested for DS....~. 1!i ~'~ Prudhoe Bay Unit DS B-~' has been shut-in since May, 1986; and conversion to water injection is pending. Since the well is shut-in, a transient pressure survey is not prudent. A static pressure survey will yield an accurate measurement of reservoir pressure. Therefore, substitution of a static survey for the transient survey required in Rule 6(b) of Conservation Order 165 is hereby approved. In addition to being shut-in, the well is only completed in the Lower Romeo. Since all flow would necessarily come only from the Lower Romeo, a spinner survey is not needed to determine this. Therefore, the Commission approves your request to waive the production profile required by Rule ll(a) of Conservation Order 165. Sincerely, Lonnie C. Smith Commis s ioner jo/3.AA213.2 0 9 !986 A~aska Oil & Gas Corls. oommis$icD Anchorage 0 CT 0 6 1986 Opers. Engr. Manager PSU Operatio-s Engr. ..['?_.'.~? CmO s Bill Sheffield, Governor ALASKA OIL AND GAS CONSERVATION COMMISSION September 29, 1986 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 TELEPHONE (907) 279-1433 Telecopy No. (907) 276-7542 ADMINISTRATIVE APPROVAL NO. 213.2 Re: Waivers to Rule 6 and Rule 11 of Conservation Order 154. Mr. D. F. S cheve ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Dear Mr. Scheve: By letter dated September 24, 1986, waivers to Rule 6 and Rule 11 of Conservation Order 165, as amended by Conservation Order 213, were requested for DS 9-11. Prudhoe Bay Unit DS 9-11 has been shut-in since May, 1986; and conversion to water injection is pending. Since the well is shut-in, a transient pressure survey is not prudent. A static pressure survey will yield an accurate measurement of reservoir pressure. Therefore, substitution of a static survey for the transient survey required in Rule 6(b) of Conservation Order 165 is hereby approved. In addition to being shut-in, the well is only completed in the Lower Romeo. Since all flow would necessarily come only from the Lower Romeo, a spinner survey is not needed to determine this. Therefore, the Commission approves your request to waive the production profile required by Rule ll(a) of Conservation Order 165. Sincerely, . ~ffith Commis s ioner jo/3.AA213.2 I CirC ' D.F. Schov~ . JMG MAM '" - 0CT031986 ' oz --"--- Opers. Engr. Manager - - PBU Operations E~gr._l ., Notice of Public Hearing STATE OF ALASKA Alaska Oil and Gas Conservation Commission Re: Application of ARCO Alaska, Inc. and Standard Alaska Production Company to revise Pressure Survey rules in Conservation Orders 165, 208 and 213. ARCO Alaska, Inc. and Standard Alaska Production Company, operators of the Prudhoe Bay Unit, by letter of September 26, 1986, have requested changes to Pressure Survey rules contained in Conservation Orders 165, 208 and 213. The objective of the proposed changes is to establish operator flexibility with regard to monitoring reservoir pressure in a manner which will allow the technical value of all surveys to be maximized. A person who may be harmed if the requested order is issued may file a written protest with the Alaska oil and Gas Conserva- tion Commission, 3001 Porcupine Drive, Anchorage, Alaska 99501 and request a hearing on the matter. If the protest is filed timely and raises a substantial and material issue crucial to the Commission's determination, a hearing on the matter will be held at the 'above address at 9:00 a.m. on November 6, 1986, in con- formance with 20 AAC 25.540. If a hearing is to be held, interested parties may confirm this by calling the Commission'S office, (907) 279-1433, after October 20, 1986. If no proper protest is filed, the Commission will consider the issuance of the order without a hearing. · Smith Commis s ioner Alaska Oil and Gas Conservation Commission Published October 4, 1986 Arco Alaska, Inc. P. 0. Box 100360 Anchorage, AK 99510 Standard Alaska Production Company P. 0. Box 196612 Anchorage, AK 99519 September 26, 1986 C. V. Chatterton, Chairman 0il and Gas Conservation Commission State of Alaska 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: /.~jaska Oil & Gas Co~s. commissio~ Anchorage Amendment to Rule 6, Conservation Order Number 165 The operators of the Prudhoe Bay Unit, Standard Alaska Production Company and Arco Alaska, Inc., request changes to Rule 6 of Conservation Order 'No. 165. The proposed amendments were discussed with you at our meeting of August 12, 1986. The objective is to establish operator flexibility with regard to monitoring reservoir pressure in a manner which will allow the technical value of all surveys to be maximized. Rule 6 Proposed amendments to Rule 6 are provided in Attachment I. A discussion of these changes follows: (a) We request that the term "initial sustained production" be replaced by "regular production", consistent with the definition of "regular" which was recently officially introduced. In addition, we request that the initial pressure survey requirement can be fulfilled by a pressure transient survey should a pressure transient survey be required for technical reasons. C. V. Chatterton, Chairman Page 2 (b) We request that a pressure static or transient survey may be used to fulfill the follow-up survey requirement since the primary objective of the follow-up survey is to determine reservoir pressure. During the first nine years of production at Prudhoe Bay, a sizeable pressure build-up data base has been established. Routine pressure build-up surveys are no longer required to determine the production characteristics of select areas of the reservoir. In addition, a time limit of twelve months is requested in place of the current six-month limit. An extension of this time limit will provide the operators with additional flexibility regarding repeat pressure survey timing, thus allowing timing to be optimized based on varying increased voidage rates associated with new wells. (c) & (d) Key well and governmental pressure survey requirements limit flexibility with regards to pressure survey site optimization. Pressure surveillance will be distributed in all areas of the field, however, with waterflood underway, the focus of pressure surveillance is now on the waterflood and gravity drainage/waterflood interaction areas. A "minimum number of surveys" requirement would allow application of surveys to areas which require the maximum technical evaluation from a reservoir management perspective. The operators would inform the Commission of the planned distribution of the required pressure surveys by December 1 of the year preceding the year during which the pressure surveys will be run. (e) Included as per Conservation 0rder No. 208, Rule 3 (amending Rule 6(e), Conservation Order No. 165). (f), (g), & (h) These sections have been included and/or modified to be consistent with the changes outlined above and Conservation Order No. 213, Rule 1 (amending Rule 6(h), Conservation Order No. 165). As noted, the primary purpose of the requested amendments is to afford the operators greater flexibility in fulfilling the Prudhoe Bay Unit's surveillance needs and reporting requirements. It does not represent an attempt to reduce the number of pressure surveys required, but does represent an attempt to accomplish a more prudent distribution of required surveys. If you desire any further information in support of the requested changes, please feel free to contact us. D. F. S cheve Arco Alaska, Inc. Attachment T. N. Tyler Standard Alaska Production Company RECEgVED SE? 2 6 1986 Alaska Oil & Gas Cons. Comrflission Anchorage Attachment I Prudhoe Bay Field Prudhoe 0il Pool Conservation 0rder No. 165 Rule 6 Pressure Surveys (a) Prior to regular production, a static bottomhole or transient pressure survey shall be taken on each well. (b) Within the first twelve months following the regular production from each well, a static bottomhole or transient pressure survey shall be taken. (c) & (d) A minimum of 95 and 87 static bottomhole or transient pressure surveys shall be run annually in the Western Operatinq Area and Eastern Operating Area, respectively. The surveys required in either (a) or (b) of this rule can be used to fulfill the minimum requirement. (e) Data from the surveys required in (a), (b), (c) and (d) of this rule shall be filed with the Commission by the last day of the month following the month in which each survey is taken. Form 10-412, Reservoir Pressure Report, shall be used to report the data from these surveys. Data submitted shall include rate, pressure, time, depths, temperature and any well condition necessary for complete analysis of each survey. The datum for the pressure surveys is 8800 feet subsea. Transient pressure surveys obtained by a shut-in buildup test, an injection well pressure fall-off test, a multi-rate test or an interference test are acceptable. Other quantitative methods may be administratively approved by the Commission. (f) & (g) Results and data from any special reservoir pressure monitoring techniques, tests or surveys shall also be submitted as prescribed in (e) of this rule. (h) By administrative order the Commission may grant time extensions and waive requirements of this rule and by administrative order the Commission may require additional pressure surveys .in (c) & (d) of this rule. 5072m PROOF OF A!~!CHORAGE, ~[,&,SKA 99§10-0040 3001BORCUPINfi: OR1V~ ANCHORAGE~ AK 99501 bA'NNA SimmONS , BEING OOb.¥ SWO~N, ACCORDING. 10 6A.~ DEC~A2gS~ ~HAT ~HE I$ THE bEGA5 ANCHORAGE ~IHES~ PUB~I, SH~O tN ~Hg ~O~N 'OF ANCH~RAG£ I~ ~HE THIRD JUD~CIAb' DIVIGX~N.~ STATE OF AbA~KA~ AND ~HAT THE NO,Icg A0-08-5553 A COPY OF WHIC~ IS HERETO ATTACHED~ ~A$ PUBLISHED OF ~ ANCHORAG~ T~N~S, ~EGI~NING E~DING 1 1850E$ 09/~3/85 09/23/85 T~tE SIZ~ OF THIS ,&D ~$:,,,,,,,,,,,,,,:, 74 LINES' TH£ PRICE OF THi.$ AD I8,..,..,.,,.,,...,.,,', $ 22.,20 THE ,AD HOBBER 2199275 'STATE O~S~ ,,'Con~tloK~mmi~,: ' . ALASKA, iNC.. u~:_~HIO MPANY d~ ~em~r { ~, ~r th~'o~d~r ollowl~l ~usku '~l.. ~. ~ Coq- { ~l~l{it~il~l~' aplrOw Jof~. '1 ' No;..{~, Rules 6 und ~1,.~ ~io~:. order No. ~/'.~ RUle~:~' ', .' "' ~ ,,, ~Oest~,the,,.as~',' ~1~r to issue: an~ o~er ~,to r~ .:~ ~ ~c° ~ 11 and Con~rvatiom' d .ul.~.t~ ~r~Qtion Order NO.'.l~: ~p~ ~, ~ule~6: Th~e.,r~'~ :~ .{l~t.~{ ~rl~ . ~dl~r .wul~' rk to the ~ressure :. ~ug~v,-.{o~411 contact monitor- Imm ~d{~uctlvlty ~roflle' i'~r~for.lnqlv{du.l. ~ plRva~j~nu~al,.~ucing c~ar~ ~ aCtor,s, cs or.we,~re.mecna~ leal p.mblem~,~aY cau~ dela~ 'In obtaining', tequlr~ .d~'. I. These revmmns "woum enaqp. :'the Co~mlsslan ~o d~l wl~h ,~ .I F'~'IgI~' 'well" ~oble~""l~'?~ ', timely fashion. ' I .Parties who may be.'ag- i ~:~r. leved If the re~renc~ o~der ~,i~ Issued are allowed'.10 days '. 'fro~ the date of this ~ubllcatlon ~ 'In which to file a protest In w~lt- I lng stating In detail the hature of their aggrlevement, and their request for a heating. The } of filing Is the Alaska OII ~nd J.Gas Con,rvatlon Commis~n, 3~1 P~rcuplne D~ive, ~nc~- age, Alaska 99~1. If such a ~ro- / test' is tlmel~ fll~, o hearln~n. 'the matter will be held atone l: a~ve address at 9:~ AM on tour ~, ~8S qt which time ms~apzs sana others may:: ~" heard:, If no such ~rotest:~ timelY:' flied, the Commissar." will consider the Issuance of t~e. order Without a h~rlng. ,. ~, ,"'r' . .' 'r~, ".'>'~' "~'~r~'W~ Ku let'' :"~,1 ',,,~rvatlon CommiSS!oO ,. ....~.~. '.r~."~'~:.".,;' . . ... ..... AO~3j.: ~.'.. ~ .:.: ~'.~: "': ~ .'~..~ ...... ~.. SOB$CRIBED AND' SW'ORN TO'BEFORgl ~,E THIS,.,,,.,.,.,.,.,,.,,.,,.,..,,. 2~ NOTARY POSbZC OF THE STATE DF. ~bASKA Ala.~ Oil & Gas Co~s. Standard Alaska Production Company, ' 900 East Benson Bou'l J P.O, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Mr. C. V. Chatterton, Chairman 0il and Gas Conservation Commission State of Alaska 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Standard Alaska Production Company is requesting administrative approval, as outlined in Conservation Order No. 213, Rule 2, to waive required productivity profiles for horizontal wells JX-2, B-30, Y-20, G-29 and high angle wells G-27 and Y-21. Utilizing conventional wireline methods, high angle deviation in these wellbores prevents logging tools from reaching the producing intervals. If you desire further information to support this request, please contact Mr. B. A. Chapman at (907) 564-4114. Very truly yours, TNT:BAC:slh 5224m. , T. N. Tyler, Manager Reservoir 0perations A unit of the or,ginal Standard Oil Company Founded in Cleveland Ohio ,n 1870 September 12, 1985 Mr. C. V. "Chat" Chatterton, Chairman Oil and Gas Conservation Commission State of Alaska 3001 Porcupine Drive Anchorage, AK 99501 Subject: Prudhoe Bay Unit Request for Conservation Order Change Dear Mr. Chatterton: ARCO Alaska, Inc. and SOHIO Alaska Petroleum Company, as Operators of the Prudhoe Bay Unit, request changes in Conservation Order No. 165, Rules 6 and 11, and Order No. 208, Rule 6 to allow AOGCC administrative approval of time period extensions and/or waivers to the pressure survey, gas-oil contact monitoring and productivity profile requirements for individual wells. The completion technique employed, unusual producing characteristics or wellbore mechanical problems can cause delays in obtaining the required data or make it impossible to gather meaningful information. The Prudhoe Bay Unit is presently evaluating the use of high-angle com- pletions, horizontal wellboresand other nonstandard completion techniques to improve recovery in various areas of the field. High angle and horizon- tal wellbores in particular will preclude the running of productivity profiles (Order No. 165, Rule.il) and possibly neutron logs (Order No. 165, Rule 9) with current logging technology. High gas-oil ratio wells present problems in terms of obtaining meaningfql transient pressure data as required by Order No. 165 Rule 6(b). Under these circumstances, the static pressure measurement obtained under Rule 6(a) Order 165 and the pressure data acquired from nearby wells to fulfill government section and key well requirements give adequate reservoir pres- sure monitoring data. Wellbore mechanical problems may also delay or preclude gathering pressure and/or productivity profile data as required in Order No. 165r Rule 6 and 11. Wellbore restrictions, fill or other mechanical conditions can block the passage of wireline tools, influence the producing character of the well, or distort the data obtained. ~Conditions such as these have caused problems in the past in obtaining meaningful information. To increase the flexibility of the Operators and the Commission to deal with individual well problems in a timely fashion, we request Conservation Order RECEIVED SEP ! 6 1985 Alaska Oil & Gas Cuns, Commission A. nchora!/e Mr. C. V. Chatterton!' September 12, 1985 Page 2 No. 165 Rules 6(h) and ll(d) and Order 208, Rule 6 (referencing Order 165, Rule 9) be amended to allow for administrative approval for time period extensions and/or waivers to the requirements of those Rules. If you have any questions concerning this request, please contact D. F. Scheve or T. N. Tyler at 263-4248 or 564-4525, respectively. Sincerely, D. F. Scheve ARCO Alaska, Inc. T. N. Tyler Sohio Alaska Petroleum Co. DFS/MLB/cb I EC IVED SEP 1 6 Alaska Oil & Gas Cons. Commission Anchorage