Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutCO 204Conservation Order Cover Page
XHVZE
This page is required for administrative purposes in managing the scanning process. It marks
the extent of scanning and identifies certain actions that have been taken. Please insure that it
retains it's current location in this file.
<::~{~_~_ Conservation Order Category Identifier
Organizing
RESCAN
[] Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED (Scannable with large
plotter/scanner)
[] Maps:
[] Other items
OVERSIZED (Not suitable for
plotter/scanner, may work with
'log' scanner)
[] Logs of various kinds
[] Other
BY:
ROBIN
Scanning Preparation
TOTAL PAGES ~ .....
BY: ROBIN (~
Production Scanning
Stage I PAGE COUNT FROM SCANNED DOCUMENT: ~l
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION:
_.~ YES ~ NO
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES NO
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES)
General Notes or Comments about this Document:
5/21/03 ConservOrdCvrPg.wpd
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
Re: THE APPLICATION OF ARCO )
ALASKA, INC. for an order )
granting an exception to )
Conservation Order No. 145 )
for the Prudhoe Bay Unit )
No. DS 15-8 well. )
Conservation Order No. 204
Prudhoe Bay Field
Prudhoe Oil Pool
September 14, 1984
IT APPEARING THAT:
·
ARCO Alaska, Inc. submitted an application, dated
August 24, 1984, requesting an exception of Rule 3 of
Conservation Order No. 145 for the Prudhoe Bay Unit No.
DS 15-8 well. The referenced Rule 3 requires
production casing or liner to be landed through the
completion zone and cement to cover and extend to at
least 500 feet above the hydrocarbon-bearing formations
which are potentially productive.
·
ARCO Alaska, Inc. proposes to run a slotted liner
through the lower most section of the Sadlerochit
Formation with no cement behind the slotted liner. The
regular seven inch liner above the slotted section will
be cemented to at least 500 feet above the
hydrocarbon-bearing zone.
~
Notice of the application was published in the
Anchorage Times on September 2, 1984.
4. There were no protests to the application.
FINDINGS:
1.
·
Completions using a slotted liner are common in many
oil-producing areas.
There already have been open hole completions and
gravel-packed completions in the Sadlerochit Formation
in the Prudhoe Bay Field.
CONCLUSION:
The requested exception will not create waste and will
add to the knowledge of completion techniques for the Prudhoe Oil
Pool.
Conservation Ord,' No. 204
Page 2
September 14, 1984
NOW THEREFORE, IT IS ORDERED THAT:
ARCO Alaska, Inc. is exempted from the requirements of
Rule 3 of Conservation Order No. 145 and may complete the Prudhoe
Bay Unit No. DS 15-8 well with an uncemented slotted liner in the
lower-most section of the Sadlerochit Formation.
DONE at Anchorage, Alaska and dated September 14, 1984.
~la sVk% Cho'~ ~ ~a~n ~G~ s~hc%~ ~emravnatlon Commiss ion
Harry W. Kugler, Commissioner
Alaska Oil and Gas Conservation Commission
Ld~Snie C. Smi~R~, Commissioner
Alaska Oil and Gas Conservation Commission
T H E
PROOF OF
PUBt, iCATION
ANCMORAG£ TI
P.O. BOX 40
ANCHORAGM, ALASKA 99510-0040
ALASKA OIL & GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE, AK 99501
LANNA SIMMONS o BEING DULY
SWORN, ACCORDING TO LAW DECLARES:
THAT SHE IS THE L~GAb CLERK OF THE
ANCHORAGE TINES, A DAILY N~WSPAPER
PUBLISHED IN THE TOWN OF ANCHORAGE
IN THE THIRD JODICIAL DIVISION,
STATE OF ALASKA, AND THAT THE
NOTICE OF. .... - ..... . ..... . ..........
A COPY OF: WHICH IS HERETO ATTACHED,
WAS PUBLISHED IN.. ..... . ........ ....
OF THE ANCHORAGE TIMES.
BEGINNING ON...................,...,
ENDING ON ...... ...... .... ..........
THE SIZE OF THIS AD WAS...... .... ..
SIGNED..........
AO-08 5541,
1 ISSUES
09102~84
09/02/84
66 LINES
;,~R:IC"~ Alaska, Ific; , has: re-
q_~.sl~l the'.Alaslm 011
. cen~rvutlon': Commi~s~n
:' Iseu~ eh order ~ grant.'the~.~e
of o sloff~' liner In t~e co~-
{Ion or'~ "P~udh~. -~oy,- U~i~
NO; DS 1~ ~Sl.,.Rum~3(t)' ~
".Co~rvatio~ Order No.~,1~5
'.which is .not' ~a~l~l. whe~
. b~':t~l~ .r~u~t, 'AR~ .'Alaska,
!lher.'wlll~ ~rovlde %d~itional In-
; .formation .... ' oh ', 'co~Pl~tlo~.
I. tKhn~ues In. f'he'. Sa~leK6~lt
'fentlal ~,s.. ' ..: .:.~ -" '" ....: '
· . . . .' ,'-.. ~. . .
. Po~fles'. who .: may .be'
grieve, if fhe .or,er Is
gr~nflng the 'refe~enc~'r~u~sf
pre ollowed 10 da~s from 'the
.._. ~- ,, . .....................
~ofe of fhls Publlcaflon In which
to flle.o profest, In wrlflng, sfaf-
Ing..In derail the natu~e'of fhelr
oggrlevement and fhelr request
for o.he~r~ng.. The Ploce.~.flllng
~ Is fhe Alaska OII and Gas Con-
: servoflon Commission, 3001
iPorcupine .Drive, Anchorage,
Alaska:99501-3192. If such o ara-
test'Is timely flle~, o hearing on
the.., matter 'will;be'
.ab0~e .gdd'ress at 9.:~,?A~
I' se~femoer' :' 1'4; .19~"' af~ 'WhiCh '
I time' "Protestants, an~, ~ otbe~s
I.maY.,be hear~, I f no such Protest
lis tlmel'y flle~; the CommlS~10n
~.w[tl: Co~sl~er the Issuance<of. th·
iorder ~lth~ut a hearing; .
THE PRICE OF THIS AD IS.............
THE AD NUMHER IS............ .... ....
SUBSCRIBED AND SWORN
TO BEFORE ME THIS...................
NOT.AR:Y PUBLIC 0~,' THE STATE OF A:LASK~
$ IS.B0
187717O
04 DAY OF $,EP.1984 0// f~
"//ss/bo
Notice of Public Hearing
STATE OF ALASKA
Alaska Oil and Gas Conservation Commission
Re: The application of ARCO ALASKA, INC. for an exception to
Rule 3(f) of Conservation Order No. 145 to use a slotted
liner in the Prudhoe Bay Unit No. DS 15-8 well.
Notice is hereby given that ARCO Alaska, Inc. has requested
the Alaska Oil and Gas Conservation Commission to issue an order
to grant the use of a slotted liner in the completion of the
Prudhoe Bay Unit No. DS 15-8 well. Rule 3(f) of Conservation
Order No. 145 requires all hydrocarbon-bearing zones be covered
by cement which is not practical when a slotted liner is used.
In support of this request, ARCO Alaska, Inc. states that the use
of a slotted liner will provide additional information on
completion techniques in the Sadlerochit Formation and should
result in increased production in low potential wells.
Parties who may be aggrieved if the order is issued granting
the referenced request are allowed 10 days from the date of this
publication in which to file a protest, in writing, stating in
detail the nature of their aggrievement and their request for a
hearing. The place of filing is the Alaska Oil and Gas Conserva-
tion Commission, 3001 Porcupine Drive, Anchorage, Alaska
99501-3192. If such a protest is timely filed, a hearing on the
matter will be held at the above address at 9:00 AM on
September 14, 1984 at which time protestants and others may be
heard. If no such protest is timely filed, the Commission will
consider the issuance of the order without a hearing.
Lonnie ~.~ Smit~
Commissioner
Alaska Oil & Gas Conservation Co~nission