Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-065 Image~ ,'oject Well History' File Cover Fi je
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
Organizing i~o,,~t []
RESCAN
[] Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
Diskettes, No.
Other, No/Type
BY:
BEVERLY ROBIN VINCENT SHERYL ~INDY
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERY~WINDY
Scanning Preparation ~ x 30 = (~ 0
BY: BEVERLY ROBIN VINCENT SHERYL~WINDY
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
Production Scanning
Stage I PAGE COUNT FROM SCANNED FILE: ........ /
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: , YES
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES
BY: BEVERLY"~I~ VINCENT SHERYL MARIA WINDY DATE:-~-~,-~
NO
NO
(SCANNING IS coMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES )
RESCANNEDB~¢~ BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE:
Is~
General Notes or Comments about this file:
Quality Checked
12/10/02Rev3NOTScanned.wpd
omml~
1 a. Well Status: DOil DGas D Plugged 181 Abandoned D Suspended 1 b. Well Class: Anchorage
20AAC 25.105 20AAC 25.110 181 Development D Exploratory
DGINJ DWINJ D WDSPL DWAG D Other No. of Completions Zero D Service D Stratigraphic
2. Operator Name: 5. Date Comp., Susp., or Aba~ 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 07/25/2007 7~~A.1 201-065 - 307-205
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 05/11/2001 50-029-21652-01-00 /
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 05/26/2001 PBU G-25A j
2617' FNL, 1973' FEL, SEC. 12, T11N, R1;¡, ~ 8. KB (ft above MSL): 72.40' 15. Field 1 Pool(s):
Top of Productive Horizon: ~¢o1
2697' FNL, 2224' FWL, SEC. 07, T11N, RJdE, UM- Ground (ft MSL): 34.7' Prudhoe Bay Field 1 Prudhoe Bay
Total Depth: It.( åÇt..J 9. Plug Back Depth (MD+ TVD) Pool
1857' FNL, 1255' FWL, SEC. 07, T11N, R1,ZE, UM 12326 8953
4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD+TVD) 16. Property Designation: /
Surface: x- 658254 y- 5969032 Zone- ASP4 12391, 8949 ., ADL 028304 /
TPI: x- 662452 y- 5969042 Zone- ASP4 11. SSSV Depth (MD+ TVD) 17. Land Use Permit:
Total Depth: x- 661465 5969861 Zone- ASP4 N/A
y-
18. Directional Survey DYes 181 No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD):
(Submit electronic and crinted information cer 20 AAC 25.050\ N/A ft MSL 1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
CNL, GR
22. CASING, LINER AND CEMENTING RECORD
SETTIN~ DEPTH MD SETTING DEPTH TVD .... AMOUNT
HOLE
Wr. PÈR FT. GRADE Top BOTTOM Top BOTTOM SIZE - ..... Puù.È[)
.
20" Insulated Conductor Surface 110' Surface 110' 26" 9 cu vds Concrete
13-3/8" 72# L-80 1 S-95 39' 2785' 39' 2685' 17-1/2" 3890 cu ft Permafrost
9-518" 47# L-80 36' 9724' 36' 8337' 12-1/4" 590 cu ft Class 'G'
5-112" 17# L-80 9462' 10169' 8113' 8723' 8-112" 484 cu ft Class 'G'
3-3/16" x 2-7/8" 6.2# 16.16# L-80 9382' 12391' 8044' 8949' 3-3/4" 146 cu ft Class 'G'
23. Open to production or injection? DYes 181 No 24. '.. .... < < \ ....i.
If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD)
(MD+ TVD of Top & Bottom; Perforation Size and Number):
None 4-1/2",12.6#, L-80 9465' 9322'
MD TVD MD TVD
25. . Adó.;--/ .,.. / ...i ,I;'T6. / ',./ /«..
vt::I\I!t::N.1 ..... r "/
SCANNED SEP o 7 2007 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
1 0220' Set Whipstock
26. PRODUCTION TEST
Date First Production: . .,......._..'f;..... ,- Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test: Hours Tested: PRODUCTION FOR Oll-Bsl: GAs-McF: WATER-Bsl: CHOKE SIZE: I GAS-Oil RATIO:
TEST PERIOD ~
Flow Tubing Casing Press: CALCULATED OIL-Bsl: GAs-McF: WATER-Bsl: Oil GRAVITY-API (CORR):
Press. 24-HoUR RATE+
27. CORE DATA Conventional Core(s) Acquired? DYes 181 No Sidewall Core(s) ACQuired? DYes 181 No
If Yes to either question, list formations and intervals cored (MD+ TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 2'1 AAC 250.071.
None ;7-~~..o,
RBDMS 8Fl AVG 2 3 2007 ,~
. STATE OF ALASKA a ~ RECEIVED
ALASKA OIL AND GAS CONSERVATION COMW§SION AUf,
WELL COMPLETION OR RECOMPLETION REPORT AND LOG .\ !J 1 6 2007
tHa~ka Oil & Gas Cons C
ion
Form 10-407 Revised 02/2007 0 R , GIN A 1NTINUED ON REVERSE SIDE
~ 872t«!7 6
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AN RS ENCOUNTERED):
NAME MD TVD
Permafrost Top
Permafrost Base
21N 10414' 8877'
21P 10424' 8881'
Zone 1B 114N 10978' 8936'
14P 11078' 8953'
29. FORMATION TESTS
Well Teste . DYes 181 No
If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
detailed test information per 20 AAC 25.071.
None
Formation atTotal Depth (Name):
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
Signed Terrie Hubble
Title Technical Assistant
Date Û8(r5/07
PBU G-25A
Well Number
201-065 307-205
Permit NO.1 A roval No.
INSTRUCTIONS
Prepared By NamelNumber:
Drilling Engineer:
Terrie Hubble, 564-4628
Garret Staudinger, 564-4242
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 0212007
Submit Original Only
Digital Wellfile
.
Page 1 of 1
.
Well: G-25
Well Events for SurfaceWell - G-25
Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> GC1 -> G -> G-25
Date Range: 06/Ju1/2007 to 22/Ju1/2007
Data Source(s): AWGRS
Events
Source Well Date
AWGRS G-25A 07/22/2007
AWGRS G-25A 07/21/2007
AI)\IG RS G-25A 07/21/2007
AWGRS G-25A 07/20/2007
AW GJ35 G-25A 07/20/2007
Description
T/I/O= BPV/Vac/Vac. Temp= S1. Monitor WHP's (pre-CTD). No change in pressures.
T/I/O=BPV/VAC/VAC Temp=SI Monitor WHPs (pre-CTD). No change in WHPs.
PULL TWC &SET BPV FOR PRE RIG
T/I/O = TWCV/vac/vac. Temp = S1. Bleed WHPs to 0 psi/Assist Cameron (PPPOTs, pre-RIG).
Assisted Cameron with PPPOT-T,IC & LDS function.
T/I/O=O/O/O. PPPOT-T (PASS), PPPOT-IC (PASS). Pre CTD. Two way check in BPV profile.
PPPOT- T: Opened bleeder screw to bleed test void (fluid). Removed 1" plug and internal
check, installed Alemite external check. Stung into test port with high pressure bleeder tool.
Functioned LDS, all moved freely with no sign of bent or broken pins, torqued to 550 Ib/ft.
Pressured void to 5000 psi for 30 min test, lost 175 psi in 15 min, lost 50 psi in second 15
min. Bled void to 0 psi. (PASS). PPPOT-IC: Opened bleeder screw to bleed test void (fluid).
Removed 1" plug and internal check, installed Alemite external check. Stung into test port
with high pressure bleeder tool. Functioned LDS, all moved freely with no sign of bent or
broken pins, torqued to 550 Ib/ft. Pressured void to 3500 psi for 30 min test, lost 800 psi in
first min. Re-torqued LDS to 600 Ib/ft. RU elephant gun to re energize secondary Y seal with
plastic pack, pump 1 stick of plastic. Re-pressure test void to 3500 psi for 30 min test, lost
100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi.
fi"-'VGB5. G-25A 07/19/2007 T/I/O=700/50/25. Temp S1. Bleed WHP's to 0 (pre PPPOT pre rig). TBGP FL 2580'. IA FL near
surface. OA FL @ surface. Bled TBGP from 700 psi to 100 psi in 3 hours. Liquid to surface shut
in to swap out gas. TBGP increased to 650 psi in 30 min. Bled lAP from 50 psi to 0 psi in 30
min. Bled OAP from 25 psi to 0 psi in 10 min. Monitored for 1 hour. Final WHP's
T/I/O=700/0/0.
SET TWC / TEST TREE/ PACKOFF TEST
CTU 9 W 1. 75" CT, Drift with DMY Whipstock. Continued from 07/16/07. MU and RIH with 2.7
" Nozzle and 2.7" DMY whipstock. B-IH and taq XO at 10226'. Confirm Taq at 10226'. POOH
and FP well. RDMO, Go to Planned Maintenance *** Job Completed ***
CTU 9 W 1.75" CT, Drift with DMY Whipstock. Move in, Wait on Veco to complete the rig up.
Continued on 7/17/07
***CONT JOB FROM 7-6-07*** DRIFT TBG W/ 2.70 CENT SD@ 10215' SLM, CENT SHOWED
RING MARK FROM XO @ 10245' MD. DRIFT TBG W/ 6' x 2.73" DRIFT SD @ 10155' SLM,
COULD NOT MAKE ANY HOLE, DRIFT CAME BACK W/ THIN SCRATCHES ABOUT 19" LONG
STARTING AT 2' FROM BOTTOM OF DRIFT. RAN 2.72 BROACH SD @ 10215' SLM. ****TURN
WELL OVER TO PAD OP, WELL LEFT S/I*****
AWGRS G-25A 07/06/2007 *** WELL S/I ON ARRIVAL**** RIH W/ 10' x 2.70" DRIFT TO 10240' MD, SD HIGH @ 10158'
SLM **** CONT JOB ON 7-7-07***
AWGRS G-25A 07/19/2007
A WG~5. G-25A 07/17/2007
Av.Y.GBS G-25A 07/16/2007
AWGRS G-25A 07/07/2007
http://digitalwellfile.bpweb.bp .com/WellE vents/Home/Default. aspx
8/15/2007
.
BP EXPL
Operations Su
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
G-25
G-25
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
7/23/2007
Code NPT
Ip
Ip
I
I
i
I
PRE
PRE
6.00 MOB
6.50 I RIGU
I
03:30 - 09:30
09:30 - 16:00
16:00 - 23:00
7.00 BOPSU~ P
I
PRE
23:00 - 00:00
i
I
i
I
1.00 BOPSU~ N
I
I
SFAL PRE
7/24/2007 00:00 - 00:30 0.50 BOPSU1 N SFAL PRE
00:30 - 01 :00 0.50 BOPSU P PRE
01:00 - 01:15 0.25 KILL Ip WEXIT
01:15 - 04:00 2.75 KILL Ip WEXIT
I
I
I
04:00 - 05:00 1.00 KILL P WEXIT
05:00 - 06:00 1.00 KILL Ip WEXIT
06:00 - 06:50 0.83 KILL f WEXIT
06:50 - 12:00 5.17 BOPSU N SFAL WEXIT
12:00 - 12:45 0.75 BOPSU1N SFAL WEXIT
12:45 - 13:10 0.42 BOPst WEXIT
13:10 - 13:30 0.33 BOPSU P WEXIT
I
I
13:30 - 13:45 0.25 KILL P WEXIT
.
Start: 7/18/2007
Rig Release: 8/12/2007
Rig Number: N1
Spud Date: 10/1/1986
End: 8/12/2007
Move from E-19B to G-25A. Accept rig at 09:30.
Installed reel. NU BOP. Swap rams for 2" CT. Change out
gripper blocks on injector.
PU brand new CT reel, length of CT 15700', e-line 15900',
slack is 1.27percent
BOP test witnessing waived by Chuck Scheeve AOGCC.
Tested all lines rams and valves to 250 and 3500 psi for 5min
each, annular to 250 -2500 psi 5min each, choke manifold
valves 250-3500 psi 5min each, note VBR failed pressure test,
borrowed a set of seals Nordic 2, Performed Accumulator
draw down test
RU hardline and heading up e-line connector in reel during
BOP test
Open VBR door, attempt to pull VBR's, found guide plate
deformed and mushroomed, similiar to what happen to lower 2
3/8" combi on E-11, grinded down the guide plate to remove
the rams, damage was caused by closing rams on oversize
pipe, believed to have happen during last koomey draw down
test, found 3 1/2" test joint which is believed to be what caused
the damage to the VBR guide plate with fresh marks on cDllar
on test joint, unable to use VBR's do to damage to guide
plates, would not align properly, did not have spare VBR's
Install 2 3/8" combi
Install test joint, tested rams from 250 - 3500psi, OK, LD test
joint
PJSM with crew on pulling CT across pipeshed
Pull test internal grapple, pull CT across, stab injector, cut off
internal grapple, NU stuffing box to injector, run CT thru S'¡¡.me,
RU hydraulic CT cutter, cut 55' of 2" CT, found e-line cab1e,
check and meg e-line, OK, boot e-line, RO hydraulic cutter,
stab injector
Pump 7bbls down CT, test hardline to inner reel valve to
4000psi, continue circ at 1.5bpm, 1400psi, filling CT with
double slick KCL
RU, rev circ, performing slack management, heard e-line move
while rev circ, RU hydraulic cutter, cutting 220' CT, 22' of e-line
Pull BPV with lubricator.
Released BPV gas to possum bellt Shut in well at choke. Well
not properly shut in for Pulling BPV. Notify Anch CTO
manager, AOGCC Chuck Scheeve, GC1 operator X4084,
Unable to contact G pad operatordirectly.Notify Nordic mgt
Alan Graff, AlanMaddsen Conduct Investigation of gas release.
Debrief on current operations with CoMan and Alan Madsen,
Drlg Supt
PJSM with BPV crew, rig personnel on pulling BPV, valve
alignment, safety hazards and precautions
Open well, finished releasing and pulling BPV with lubricator,
shut in master valve, open choke released trap pressure to
tiger tank, RD lubricator and BPV, secured well, offload
lubricator and BPV from rig floor
PJSM on handing and heading up CTC and e-coil, adjusting
Printed: 8/15/2007 1 :40:04 PM
.
.
BP
Legal Well Name: G-25
Common Well Name: G-25 Spud Date: 1 0/1/1 986
Event Name: REENTER+COMPLETE Start: 7/18/2007 End: 8/12/2007
Contractor Name: NORDIC CALISTA Rig Release: 8/12/2007
Rig Name: NORDIC 1 Rig Number: N1
Date Code NPT Phase
7/24/2007 13:30 - 13:45 0.25 KILL P ¡WEXIT rollers on gooseneck for 2" CT
13:45 -15:15 1.50 KILL P IWEXIT Adjust rollers for 2" CT, Install Kendall dipple CTC, pull test to
36K
15:15 -16:00 0.75 KILL P WEXIT MU Nozzle BHA #1 with UOC, head up e-line, Meg e-line, ok,
installed LaC blind sub, and nozzle
16:00 - 16:30 0.50 KILL P WEXIT PJSM with all involved personnel on pumping operations, valve
alignment and good communication
16:30 - 19:00 2.50 KILL P WEXIT Pressure Test CT riser to 3500 psi, est circ rates at 1.09bpm,
1380psi, 1.59bpm, 2080psi, 2.19bpm, 3014psi, 2.50, 3500psi,
Pressure up to 1500psi, open swab and master valves, Shut in
pressure stabilized at 1406psi, bullhead down tubing at
1.50bpm, 3350 - 2900psi, pressure increased to 3450psi after
pumping 116bbls, slowed pumps down to 1.22bpm, 3180psi.
Bullhead a total of 142bbls of fluid @ 1 bpm/3500psi CTP &
2600 WHP. Not getting required +/-4bpm rate to kill well.
19:00 - 19:25 0.42 KILL P WEXIT Attempt to snub in hole - injector tripping out @ -14k. Line up
to take returns to the tiger tank. Attempt to bleed down the
WHP via the Swaco auto choke - not working properly. Switch
to manual choke & bleed off WHP to 1800psi with -11 k CT wt.
19:25 - 21 :30 2.08 KILL P WEXIT RIH with nozzle BHA #1 to 10200' maintaining +/-1800psi WHP
& taking gassy returns to the tiger tank.
21 :30 - 22:20 0.83 KILL Ip WEXIT S/I choke & bullhead 15bbls KCL fluid (vol from 10200' to
i PBTD) into perfs @ 0.75bpm/2800psi CTP & 2250psi WHP.
22:20 - 00:00 1.67 KILL P WEXIT Open up choke & attempt to kill well conventionally with
1.92bpm/4000psi CTP & 2000psi WHP.
7/25/2007 00:00 - 00:45 0.75 KILL P WEXIT Continue pumping to kill well conventionally with
2.15bpm/4000psi & 2000psi. Observe frosting on choke
manifold lines & valves - suspect gas hydrates & possible
ice-plugging of choke lines. Also did not getting back much
returns after 280bbls pumped.
00:45 - 03:00 2.25 KILL P WEXIT Open up choke more & continue pumping additional 11 Obbls
until returns cleaned up. Circ 2X BU with no gas to surface.
Start taking returns to pits. Bleed down OAP from 1 OOOpsi to
250psi. Meanwhile call for 150kcps flo-pro pill to squeeze into
IWEXIT the perfs before POOH.
03:00 - 04:00 1.00 KILL P Line up & pump down 40bbls of 150kcps flopro pill down to
I nozzle. S/I well & squeeze-in 20 bbls @ 0.93bpm/3300psi CTP
& 1550-1750psi WHP. Open up choke & lay-in remaining flopro
pill 1 :1.
04:00 - 05:45 1.75 KILL P WEXIT POOH nozzle BHA#1.
05:45 - 06:45 1.00 KILL P WEXIT Flowcheck well - stable while having change out with WSL and
i tool pusher discussing plan forward
06:45 - 07:15 0.50 KILL P WEXIT PJSM on injector handling for bha changes and opening 2"
drain line
07:15 - 07:30 0.25 KILL P WEXIT POH with nozzle BHA #1, LD same
07:30 - 08:00 0.50 WHIP P WEXIT Make up BHA#2 with whipstock and Mech WS Packer.
08:00 - 10:35 2.58 WHIP P WEXIT RIH BHA#2 tD 9750.
10:35 - 10:45 0.17 WHIP P WEXIT Ran tie in pass. CDrrelated back to PDC log. Baker correction
of plus 1, SLB CT minus 13.
10:45 - 10:55 0.17 WHIP P WEXIT RIH to 10228. Set whipstock. TOWS 10220, BOWS 10228.
10:55 - 12:15 1.33 WHIP P WEXIT POH BHA#2.
12:15-12:30 0.25 WHIP P IWEXIT Pressure test whipstock packer to 2000 psi.
12:30 - 13:30 1.00 WHIP P WEXIT PJSM laying down BHA and unstabing injector. POH with
Printed: 8/15/2007 1 :40:04 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
7/25/2007
Date
From - To
.
.
G-25
G-25
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
Phase
7/18/2007
8/12/2007
N1
Spud Date: 10/1/1986
End: 8/12/2007
1.00 WHIP P
0.50 STWHIP P
0.33 STWHIP P
0.42 STWHIP N
1.42 STWHIP N
I
IIWEXIT
WEXIT
'WEXIT
DFAL WEXIT
DFAL WEXIT
12:30 - 13:30
13:30 - 14:00
14:00 - 14:20
14:20 - 14:45 '
14:45 - 16:10
16:10 - 18:30
2.33 STWHIP P
WEXIT
~ 18:30 - 19:30 1.00 STWHIP P WEXIT
G:t5ß 19:30 - 20:45 1.25 STWHIP P WEXIT
20:45 - 21:40 0.92 STWHIP P IWEXIT
21 :40 - 22:40 1.00 STWHIP P WEXIT
22:40 - 23:00 0.33 STWHIP P WEXIT
23:00 - 23:45 0.75 STWHIP P WEXIT
23:45 - 00:00 0.25 STWHIP P WEXIT
7/26/2007
00:00 - 01 :00
01 :00 - 01 :45
01 :45 - 03:45
03:45 - 04:45
04:45 - 05:35
1.00 STWHIP P
WEXIT
0.75 STWHIP P
WEXIT
2.00 STWHIP P
1.00 STWHIP P
WEXIT
WEXIT
0.83 DRILL P
PROD1
05:35 - 07:20 1.75 DRILL P PROD1
07:20 - 07:40 0.33 DRILL P PROD1
07:40 - 08:00 0.33 DRILL P PROD1
08:00 - 13:30 5.50 DRILL P PROD1
BHA#2 and lay down whipstock running tool.
PU milling assembly, BHA#3.
RIH with BHA#3.
Stop at 1400ft. CoilTrac is not working. POH to BHA#3.
Troubleshoot BHA#3. Change out Power and Communication
Sub.
RIH with BHA#3. Tag WS/Lnr pinch pt without pumps @
10232'. P/U with 30k up wt. Down wt = 18.5k. Bring on pumps
& establish freespin @ 1.5bpm/1700psi. RBIH with pumps on &
retag WS/Lnr pinch pt @ 10231.6'. Correct CTD to 10220'
inch t CTD & fla CT.
Start milling window with 1.55/1.55bpm, 1700/1800psi, 1 k
DWOB & 1fph ave ROP. Mill to 10221'.
Mill to 10222' with 1.55/1.55bpm, 1700/1890psi, 1.8k DWOB &
0.8fph ave ROP.
Mill to 10223' with 1.55/1.55bpm, 1700/1800psi, 0.8k DWOB &
1fph ave ROP.
Mill to 10224' with 1.55/1.55bpm, 1700/1800psi, 0.8k DWOB &
1fph ave ROP. MWD still acting up.
Mill to 10225' with 1.55/1.55bpm, 1700/1800psi, 0.8k DWOB &
1fph ave ROP. Exit into formation @ 10225'.
Control mill to 10226' with 1.55/1.55bpm, 1700/1800psi, 0.8k
DWOB & 1.3fph aye ROP.
Wiper trip clean to 10200'. RBIH clean to btm. Establish
frees pin @ 1.5bpm/1600þsi. Observe MWD communicating
only to the BCM in the P&C. No good communication could be
established from the CTM & other components below.
Currently will not be able to disconnect in the worst case
scenario of getting stuck. Decide to finish up rat hole with
current BHA failure.
Control mill 1 0' formation to 10235' with 1.5/1.5bpm,
1550/1850psi, 9fph ave ROP & 2.4k DWOB.
Swap wellbore to 8.6 ppg reconditioned flopro mud with 12ppb
K-G & 3% L-T. Meanwhile backream/dress window/rat hole
several times. Window looks clean. Tentative window depths
are: TOWS = 10220', TOW = 10220', BOW = 10225', RA Pip
tag = 10225'.
POOH window milling BHA #3, while displacing well to mud.
PJSM. UD BHA #3 & inspect mills. Both window mill & string
mill gauge 2.73" go / 2.72" no-go. Wear on window mill face
indicate center crossed the liner wall, found EDC sub shorted
out internally
M/U drilling BHA#4 with new Hughes 2.7" x 3" DOSTRWD
bicenter bit #2, 1.1 deg X-treme motor, BHI HOT, USMPR,
DGS, DPS, EDC, P&C, SWP, LQC & UQC. Scribe tools. M/U
injector & Initialize/function test BHI tools.
RIH drilling BHA#4 to 9773', up wt at 9300' 28k
Tie-in pass f/ 9773' to 9808', corrected CT -6', Baker coiltrak
+7,dn wt at 9773', 2.4fpm, 14.9k
RIH to TOW, orient TF to 30L, slide thru window without pumps
to btm
Drill to 10400', TF at 19L-58R, 1.58/1.57bpm, 3000psi, FS
1.58bpm, 2750psi, ECD 9.57ppg, WOB .5-1k, AP 4314psi, BP
Printed: 8/1512007 1 :40:04 PM
9249'
I I
Minimum ID::: 1.995", 2-3/8"
LINER, 10,024'
Nordic Rig 1, G-25A incidenWormation
.
Page 1 of tl
þÛ.,y.,
Maunder, Thomas E (DOA)
From:
Sent:
To:
Cc:
Engel, Harry R [Harry.Engel@bp.com]
Thursday, August 16, 2007 2:55 PM
Maunder, Thomas E (DOA)
Archey, Pat; Staudinger, Garret; NSU, ADW Drlg HSE Advisor; Madsen, Alan D (Fairweather);
Engel, Harry R; Rossberg, R Steven; NSU, ADW Drlg Nordic 1 Supervisor
Subject: Nordic Rig 1, G-25A incident information
-
~\-b(05
Tom-
This is a follow-up to our telephone conversation earlier today regarding the subject incident.
The incident occurred July 24, 2007 on Nordic Rig #1 while pulling a Back Pressure Valve
(BPV) from well G-25A. The incident resulted in a small volume gas release and we believe it
did not require notification to the AOGCC as required in 20 AAC 25.205. However we did
notify the AOGCC shortly after the incident occurred. The purpose of this email is to provide
you with a summary of the incident and corrective actions that will prevent future occurrences.
SummalY
The rig crew and valve crew rigged up a lubricator on top of the Blow Out Preventers (BOP) to
pull the BPV set just below the well tree. While unseating the BPV, gas was released to the
shale shaker possum belly. The crew closed a drain valve on the BOP stack and shut in the
choke manifold. Both of these systems were determined to be open. In a matter of minutes
the well was shut in and secured. Notifications of the gas release were made and the
investigation was initiated. There we no injuries associated with this incident. The incident
can be attributed to failure to follow field procedures.
Corrective Actions
1. Standard Operating Procedures (SOP) will be updated to reflect BPV operations performed
on coil tubing and rotary rigs. SOP's will include the possibility of a gas release during BPV
operations.
2. The incident and lessons learned have been discussed in appropriate contractor crew
safety meetings. Safety meetings will reinforce the use of procedures and Task Hazard
Assessments (THA).
3. Nordic has developed a procedure where the Toolpusher is the only person who can open
the BOP drain valves.
4. Disciplinary action has been taken.
5. BPXA Alaska Drilling & Wells (ADW) has developed and communicated a Safety Alert
describing the incident and lessons learned.
I want to emphasize that BPXA and our contractors have taken this incident seriously and
have imitated actions to prevent future occurrences.
Please consider this the final report associated with this incident.
Regards,
Harold R. Engel (Harry)
Engineering Team Leader
8/17/2007
G-25B Well Control InCident.
.
Page 1 of2
Maunder, Thomas E (DOA)
From: Archey, Pat [Patrick.Archey@bp.com]
Sent: Wednesday, August 15, 20076:01 PM
To: Maunder, Thomas E (DOA)
Subject: RE: G-25A (201-065) Well Control Incident
Tom,
We'll get you something. A report was done and is in our traction system. I don't know if BP sends out that report
or if we summarize it in an e-mail. I'm checking with Harry, but what do you usually get from us?
Pat Archey
8P Alaska
Coiled Tubing Drilling Manager
1JIIk. (907) 564-5803
Cell (907) 240-8035
- --~------_.
From: Maunder, Thomas E (DOA) (mailto:tom.maunder@alaska.gov]
Sent: Friday, August 10, 20077:41 AM
To: Staudinger, Garret
Cc: Archey, Pat; Crane, Lowell R; aogcc_prudhoe_bay@admin.state.ak.us
Subject: RE: G-25A (201-065) Well Control Incident
Garret,
I was wondering if there was any further information regarding the investigation into the Nordic 1 incident on G-
25A
Thanks,
Tom Maunder, PE
AOGCC
From: Maunder, Thomas E (DOA)
Sent: Tuesday, July 24, 2007 9:53 AM
To: Staudinger, Garret
Cc: AOGCC North Slope Office; Pat Archey; Lowell Crane
Subject: RE: G-25A (201-065) Well Control Incident
Garret,
Thanks for the message. Keep us informed as additional information is available. Also, please note that I believe
the proper well reference should still be G-25A since no knew drilling work had been done. I have made this
change in the subject line and added the permit to drill number. The work underway was authorized by sundry
307-205.
Call or message with further information.
Tom Maunder, PE
AOGCC
~--~_..~-----'----"-'--_._----'_._---~--~~---~
From: Staudinger, Garret (mailto:Garret.Staudinger@bp.com]
8/17/2007
G-25B Well Control InCident.
.
Page 2 of2
Sent: Tuesday, July 24,20079:16 AM
To: Maunder, Thomas E (DOA)
Subject: G-2SB Well Control Incident
Tom,
There was a well control incident this morning on Nordic 1 around 07:00. Nordic 1 was rigged up on G-25 when
there was a gas release to the possum belly. An investigation of the incident is currently underway and more
details are to follow.
Thank you,
Garret Staudinger
BP Exploration Alaska, Inc.
CTD Engineer
Work: (907) 564-4242
Cell: (907) 440-6892
8/17/2007
.
~V~VŒ (ID~ ~~~~æ~
.
A I~AfliliA. OIL AlQ) GAS
COlWSBRVATlOlW COMMISSION
SARAH PALIN, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501·3539
PHONE (907) 279·1433
FAX (907) 276-7542
Garret Staudinger
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
(1b \- ofÞ6
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-25A
Sundry Number: 307-205
Dear Mr. Staudinger:
S'~~NaJ JUN 2 6 2007
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
I d fi · .~... 'A' .,.
enc ose orm. .. -. ... ~._- ..... .'
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may me with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
DATED this ~ay of June, 2007
Enc!.
nc oraae
1. Type of Request: 181 Abandon o Suspend o Operation Shutdown o Perforate o Time Extension
o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well
o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ~ Development D Exploratory 201-065 -
3. Address: D Service D Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21652-01-00 ,/
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU G-25A ,/
Spacing Exception Required? DYes ~No
9. Property Designation: 110. KB Elevation (ft): 11. Field / Pool(s):
ADL 028304 - 72.40 ,/ Prudhoe Bay Field / Prudhoe Bay Pool
12. PRESENT WELL CONDITION SUMMARY i ..' .... ......
Total Depth MD (ft): Total Depth TVD (ft):1 Effective Depth MD (ft): IEffective Depth TVD (ft): Plugs (measured): Junk (measured):
12391 ,/ 8949 - 12326 8953 N/A N/A
Casina Lennth Size MD TVD Burst Collacse
Structural
Conductor 110' 20" 110' 110'
Surface 2746' 13-3/8" 2785' 2685' 4930 2670
Intermediate
Production 9688' 9-518" 9724' 8337' 6870 4760
Liner 707' 5-1/2" 9462' - 10169' 8113' - 8723' 7740 6280
Liner 3009' 3-3/16" x 2-7/8" 9382' - 12391' 8044' - 8949' 13450 13890
Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft):
10750' - 12320' 8916' - 8953' 4-1/2",12.6# L-80 9465'
Packers and SSSV Type: 9-5/8" x 4-1/2" TIW I Packers and SSSV MD (ft): 9322'
4-112" SSSV Otis Landing Nipple 2074'
13. Attachments: 14. Well Class after proposed work:
~ Description Summary of Proposal ~ BOP Sketch D Exploratory ~ Development D Service
D Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencing Operations: June 30, 2007 DOil DGas D Plugged ~ Abandoned
17. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL
Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garret Staudinger, 564-4242
Printed Name Garret Staudinger Title CT Drilling Engineer
Signature j!).J- L [ ~ Prepared By Name/Number:
., Phone 564-4242 Date Sondra Stewman, 564-4750
ù"'"-t\
~ Commission Use Onlv
, I Sundry Number: 3}ryn-
4. ."". r
Conditions of approval: Notify Commission so that a representative may witness
D Plug Integrity o BOP Test D Mechanical Integrity Test D Location Clearance
Other: \Net \ \ c.c"'~ \ (,CyV\~~__.\ ~<.. \' ~ .t\-t\-<:'" ~,~~
Subsequent Form Required: '-\0,
~ISSIONER APPROVED BY t-.2o~41
Accroved Bv: -¡ THE COMMISSION Date
Form 10-403 Revised 06/2006 V" \J(/ Submit In Duplicate
~ fu..vt:IVt:U
. STATE OF ALAm (p'LS'D"la ¿..;;K).ð1- JU 1
ALASKA Oil AND GAS CONSERVATION COM ION { . N 9 2007
APPLICATION FOR SUNDRY APPROVAIþ1í\~Alaska Oil & Gas Cons. Commission
20 AAC 25 280 9 , A h
ORIGINAL
RBDMS BFL JUN 2 6 2DD7
~ 6P~o/
.
.
Obp
To: ~~~~~~~(
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Garret Staudinger
CTD Engineer
Date: June 18, 2007
Re: Prep Prudhoe G-25A for CTD sidetrack, jj,þ
G-l.'17
Sundry approval is requested to prepare ~or a sidetrack. Well G-25A was sidetracked in May 2001 as a
Zn lB horizontal producer. The high quality Zn lB sands that were hoped for were never encountered. The well
was making less oil and more gas than expected, hit marginal, and cycled poorly with little on time. Additional
perforations were added in 2002 and 2003, but there was very little benefit.
REASON FOR SIDETRACK:
G-25A is a high gas rate, swing well with very little on-time. Due to the low remaining value of this well and the
lack of well work options, the well is recommended for a coil sidetrack. The sidetrack, G-25B, will exit the 3-
3/16" liner in Zone 2 and target reserves with a 2100' Zone lB horizontal completion.
Pre-Rig Work: (Scheduled to begin June 30, 2007)
1) 0 Passed MIT-IA and MIT-OA May 2,2007
2) 0 AC -LDS; AC-PPPOT-IC, T
3) S Run dummy whipstock drift to 10245'
4) E Set 3-3/16" Baker Packer WS wi HS orientation at 10230'
5) 0 PT Packer Whipstock to 2000 psi
6) 0 PT MV, SV, WV
7 0 Blind and bleed lines, remove wellhouse, level pad
Rig Work: (Schedule to egm u y ,
1) MIRV Nordic 1 and test BOPE to 250psi low and 3500psi high.
2) Mill 2.74" window at 10230' and 10' of rat hole. Swap the well to Flo-Pro.
3) Drill Build: 3.0" OH, 370' (12 deg/100 planned)
4) Drill Lateral: 3.0" OH, 2100' (12 degl100 planned)
5) MAD pass with resistivity tools in memory mode
6) Run 2-3/8" solid liner leaving TOL at 10030'
7) Pump cement leaving TOC at 10030'
8) Cleanout liner and MCNL/GR/CCL log
9) Test liner lap to 2000 psi
10) Perforate liner per asset instructions (~1 000')
11) Freeze protect well and RDMO
Post-Rig Work:
1) Install well house, flow line and gas lift valves.
2) Test Separator (~1000' of perfs)
~~t.~~s'? \,'Ntr
c.Q:~<é."\~O~,~\\' \sdo.~
C:, -·d-S ~ Cö-~"",\t.~'
.~, 'S v..~'-J'::'" \ IJ:!M
t t("
Garret Staudinger
CTD Drilling Engineer
564-4242
CC: Well File
Sondra Stewman/Terrie Hubble
TREE = .
W8..L/-EAD=
AcrtJATOR=
1<8. 8.EV =
SF. 8.EV =
KOP=
MIx Angle =
Datum III[) =
Datum TVD =
6" M:EVOY
M:EVOY
OTIS
72.4'
36.5'
1775'
96 @ 12214'
10404'
8800' SS
G-25A
13-318" CSG, 72#, L-80, ID = 12.347"
Minimum ID = 2.372" @ 10246'
3·3/16" X 2·718" XO
9-5/8" CSG, 47#, L-80, ID = 8.681"
I 3-112" X 3-3/16" XO, ID = 2.80" I
9391'
4-112" 'ffiG, 12.6#, L-80, .0152 bpf, ID = 3.958"
I TOP OF 5-112" LNR
SIZE
Z'
1-11/16"
1-11/16"
2'
Z'
Z'
2'
ÆRFORA TION SlJP./IIMRY
REF LOG: SNS CIII.. 05127101
ANGLE A T TOP ÆRF: 87 @ 10625'
Note: Refer to Production DB for historical perf data
SPF INTERVAL OFWSQZ DATE
6 10750 - 10825 0 09104I02
4 10935 - 10960 0 08f21103
11125-11150 0 08f21103
4 11440 - 11530 0 05128101
4 11590 - 11790 0 05128101
4 11840 - 12080 0 05128101
4 12180 - 12320 0 05128101
.
I I
SAF NOTES: WaL EXCEEDS 70· 0 10477' & GOES
HORIZONTAL 010688'.
2072' -i 4-112" SSSV OTIS LNDNG NIP, ID = 3.813"
9249' 4-112" OTIS XA SLIDING SL V, ID = 3.813"
9308'
TMI SBR TBG SEA L A SSY, ID = 4.750"
9322' -i 9-518" x 4-1/2" TWV PKR, ID = 4.750" I
9375'
9382' H
9416' .J
9414' H
9465' H
4-112" OTIS X NIP, ID = 3.813"
3-3/4" BKR LNR DEPLOY SL V, ID = 3.00" I
4-112" OTIS XN NIP, MILLED TO 3.80" ID I
ELMD TT LOGGED 03/26/87 I
5-112" TI\IV SEAL ASSY W/O SEALS I
10168' H TOP OF WHIPSTOCK
;)-I/¿ MLLUUI VVII'lUUVV
1n1AA'-1n1~'
~ ;:---i 10245' H 3-3/16" X 2-7/8" XO, ID = 2.372" I
2-7/8" X 10' MARKERJT I
5-112" LNR, 17#, L-80, .0232 bpf, ID= 4.892" H 10800'
I PBTD H 10557'
DATE REV BY COMMENTS
12104186 ORIGINAL COMPLETION
05115101 RNIIlh CORRECTIONS
05125101 CHlKAK em SIDETRACK
09104102 JAFIKK ADPERF
09116102 JLGltlh MlNIWM ID CORRECTION
04/17104 lVIICIKAK PERF CORRECTIONS
DATE REV BY COI\ltÆNTS
06112104 CMOIPAG DATUM CORRECTION
I PBTD H 12328'
I 12391' I
2-7/8" LNR, 6.16#, L-80 STL, .0058 bpf,
ID = 2.372"
FRUDHOE BAY UNIT
W8..L: G-25A
ÆRMT No: 1861620
API No: 50-029-21652-01
SEe 12, T11 N. R14E
BP Exploration (Alas ka)
· TREE:'
W8..lHEAD=
ACTUATOR:
KB. 8..E:V :
SF. 8..E:V :
KOp:
IIt1ax Angle:
Datum MD:
Datum lVD:
6" I\Ik:E:VOY
I\Ik:E:VOY
OTIS
72.4'
36.5'
1775'
96 @ 12214'
10404'
8800' 55
ES: WELl. EXCEEDS 70" @
9249'
I I
5-1/2" LNR, 17#, L-80, .0232 bpf, 10: 4J~92"
ÆRFORA TtON 5UM1IIIARY
REF lOG: SWS CNL 05/27/01
ANGLE AT TOP PERF: 87@ 10625'
Note: Refer to Production DB
SPF INTERvAL
6 10750 - 10825
4 10935 10960
11125 -11150
11440 - 11530
11590 - 11790
11840 - 12080
12180 - 12320
SIZE
2"
1-11/16"
1-11/16"
2"
2"
2"
2"
9308'
TW SSR
ID ~ 4.750"
9322'
9391'
5/01 5-1/2" MllLOUT
WINDOW 10168' - 10173'
4
4
4
4
o
o
o
o
o
o
o
08/21/03
08/21/03
OS/28/01
05/28/01
05/28/01
05/28/01
COMMENTS
ORIGINAL
RNltlh CORRECTIONS
CHlKAK em SIDETRACK
JAF/KK
PRUDHOE BAY UNIT
W8..l:
No:
API No:
10 CORRECTION
BÞ exploration (AlélŠka)
'IØ' fW
op of bag
bttm of bag
middle of slips
middle of pipes
iddle of flow cross
middle of blind/shears
iddle of pipe/slips
L..
.
.
Review of Sundry Application 307-205
BP Exploration (Alaska) Inc.
Well Prudhoe Bay Unit G-25A
Prudhoe Bay Field, Prudhoe Oil Pool
AOGCC Permit 201-065
Requested Action:
BP Exploration (Alaska) Inc. (BPXA) proposes to plug the existing well to prepare it for
sidetracking.
Recommendation:
I recommend approval of BPXA's proposed actions
Discussion:
Well G-25A was originally drilled and completed, as a sidetrack of the existing well G-
25 in 2001. The well has produced at a high GOR and therefore had to compete for space
in the processing facilities and generally only produces for a few days at a time. An
attempt at sustaining production for a longer period of time was begun in February of
2007. Oil production was initially promising with a rate of about 700 BOPD but the
GOR was approximately 60,000 scf/stb, In short order the production rate decreased to
about 200 BOPD and the GOR rose to over 100,000 scf/stb. The well was shut in after
about a month and a half of production and has remained idle since.
Conclusion:
Since the well is producing at a high GOR and is not competitive with other wells for
processing facility space at can only produce for a few days a month and therefore is of
limited value. Abandoning the existing wellbore and sidetracking the well again in an
effort to find lower GOR production so that the well can be produced on a more
consistent basis is a prudent decision.
D.S.RObY#~
Reservoir En~
June 22, 2007
e
-
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker. doc
WELL LOG
TRANSMITTAL
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7~Street
Suite # 700
Anchorage, Alaska 99501
RE · Distribution - Final Print(s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of'
Joe¥ Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 1369
Stafford, TX 77497
BP Exploration (Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd,
Anchorage, AK 99508
LOG DIGITAL MYLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT[S) OR
CD-ROM FILM COLOR
Open Hole I I 1
Res. Eval. CH 1 I 1
G-25A 8-20-03 Mech. CH 1
Caliper Survey
Signed'
Print Name:
ProActive Diagnostic Services, Inc., PO Box 1369 Stafford lx 77477
?hon¢:(28j) 565-9055 Fax:(281) 565-1369 E-mail: pd$~mCmorylog.¢om WCbstt¢: www. mCmorylog.¢om
S{ STATE OF ALASKA ,'(~
ALA h,~ OIL AND GAS CONSERVATION C ,v,MISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
Abanon[-1 SuspendF1 Operation ShutdownE] PerforateI Variance[-'[ Annuar Disposalr-~
After Casin~E] RepairWellr-1 Plu~l Perforations['] StimulateE] Time ExtensionD Other['-I
Change Approved Program r'"] Pull Tubing r"] Perforate New Pool F~ Re-enter Suspended Well r-~ ADD PERFS
2. Operator 4. Current Well Class: 5. Permit to Ddll Number:
Name: BP Exploration (Alaska), Inc. Development I Exploratory[~ 201-065
3. Address: P.O. Box 196612 6. APl Number
Anchorage, Ak 99519-6612 Stratigraphic D Service r-] 50-029-21652-01-00
7. KB Elevation (ft): 9. Well Name and Number:
72.00 G-25A
8. Property Designation: 10. Field/Pool(s):
ADL 028304 Prudhoe Bay Field ! Prudhoe Bay Oil Pool
11. Present Well Condition Summary:
Total Depth measured 12391 feet
true vertical 8949 feet Plugs (measured)
Effective Depth measured 12326 feet Junk (measured)
true vertical 8953 feet
Casing Length Size MD TVD Burst Collapse
Conductor 110' 20" 149' 149' 40K 520
Surface 2746' 13-3/8" 2785' 2685' 80K 2670
I ntermeidate 9688' 9-5/8" 9724' 8337' 80K 4760
Liner 707' 5-1/2" 9462'-10169' 8113'-8723' 80K 6280
Sidetrack Liner 3009' 3-3/16"x2-7/8" 9382'-12391' 8044'-8949' 80K, 10530
Perforation depth: Measured depth: Open Perfs 10625'-10750', 10935'-10960', 11125'-11150', 11440'-11530',
Open Perfs 11590'-11790', 11840'-12080', 12180'-12320'.
True vertical depth: Open Perfs 8912'-8916', 8926'-8932', 8959'-8963', 8968'-8976',
Open Perfs 8978'-8979', 8978'-8968', 8963'-8953'.
Tubing: ( size, grade, and measured depth) 4-1/2", 12.6#, L-80, TBG @ 9322'. 4-1/2", 12.6#, L-80, Tubing Tail @ 9457'.
Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" TIW Packer @ 9322'. ... ,. .... ~"i" ~;: '""
4-1/2" Otis SSSV Landing Nipple @ 2072'.
12. Stimulation or cement squeeze summary: "'" '~ ~ ....... '~" '
Intervals treated (measured): .... ... ....... ' "
Treatment descriptions including volumes used and final pressure: ,..
13 Representative Daily Averaqe Production or Injection Data
OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: SHUT-IN
Subsequent to operation: 1259 35413 40 736
14. Attachments: 15. Well Class after proposed work:
ExploratoryE] DevelopmentB ServiceD
Copies of Logs and Surveys run __ 16. Well Status after proposed work:
OilI Gasr"] WAG[~ GINJ[-"~ WIN Jr-'] WDSPL[~
Daily Report of Well Operations __X
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISundry Number or N/A if C.O. Exempt:
Contact DeWayne R. Schnorr I N/A
Printed Name DeVV. ayne R. Schnorr ,, , Title Techical Assistant
Signature ~.,~¢~jz.~,~-~~.~~, G i hie^ b~, 564.5174 Date sept
I-orm 1 u-4u4 Hevlsea z/zuu;~
G-25A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
08~20~2003 PERFORATING' JEWELRY LOG--DEPTH CONTROL; PERFORATING
08/21/2003 PERFORATING: PERFORATING
08/25/2003 TESTEVENT--- BOPD' 926, BWPD' 22, rvlCFPD. 39,632, AL RATE' 0
08/20/03
EVENT SUMMARY
CTU #5. COIL FLAG/ADD PERFS. RIH WITH WFD 1-11/16" MHA & PDS
MEMORY GAMMA/CCL & 2.20" CARRIER AND LOG FROM 11300' TO 10000',
THEN POOH. TIED IN WITH MGR/CNL DATED 27-MAY-01. TIED IN
CORRECTION (-8 FT). RIH WITH WFD 1-11/16" MHA & 25' OF 2" OD 4 SPF
PJ2006 HMX PERF GUNS & PERFORATE FROM 11,125'-11,150' AND POOH.
RIH WITH GUN #2: 25' OF 2" OD 4 SPF PJ2006 HMX PERF GUNS &
PERFORATE FROM 10,935'-10,960' AND POOH.
08/21/03
CTU #5 ADD PERFS CONTINUED FROM 08/20/03 WSR. PULLED OUT OF WELL
AFTER FIRING FINAL PERF GUN. PUT WELL ON PRODUCTION TO LP
HEADER. <<< JOB COMPLETED >>>
08/25/03 TESTEVENT --- BOPD' 926, BWPD' 22, NICFPD' 39,632, AL RATE' 0
FLUIDS PUMPED
BBLS
141 50/50 METHANOL WATER
141 TOTAL
ADD PERFS
08/20-21/2003
THE FOLLOWING INTERVALS WERE PERFORATED USING THE 2" POWERJET PJ2006 HMX
GUN, LOADED @ 4 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION.
10935' - 10960'
11125'- 11150'
Page 1
Permit to Drill 2010650
DATA SUBMITTAL COMPLIANCE REPORT
61312003
Well Name/No. PRUDHOE BAY UNIT G-25A Operator BP EXPLORATION (ALASKA) INC
MD 12391 f TVD 8949 ~'' Completion Dat 5/29/2001. ~ Completion Statu 1-OIL Current Status 1-OIL UIC N
APl No. 50-029-21652-01-00
REQUIRED INFORMATION
Mud Log N._~o Sample Nc) Directional Survey Nc)
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fmt
(data taken from Logs Portion of Master Well Data Maint)
! ~ Var LIS Verification
I ED ~ Var LIS Verification
·
Interval
Log Log Run OH I Dataset
Name Scale Media No Start Stop CH Received Number
I 10151
1 10182
9030
Comments
-i 01
12400 Open 12/28/2001 ~
12391 Open 4/19/2002 u1'0774 ,.~
12350 Case 6/22/2001 ~t9-157 ~9030-12350
CH 6/15/2001 Directional Survey, Paper
Copy
OH 6/15/2001 MWD Survey, Digital Data
CH 8/15/2001 Directional Survey, Paper
Copy
OH 8/15/2001 MWD Survey, Digital Data
CH 6/14/2001 Directional Survey, Paper
Copy
OH 6/14/2001 MWD Survey, Digital Data
12320 OH 6/22/2001 ---9030-12320 BL, Sepia
12320 CH 6/22/2001 ~'~57 ~030-12320, Digital Data
10915 Case 9/23/2002 1~025~,'~oil flag
il~.B' D ,C..,~ee Notes
Directional Survey FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL 9030
FINAL 9030
1 9713
MWD Survey
Directional Survey
MWD Survey
Directional Survey
MWD Survey
~-a,R~OM P/NEU
---1'O157
Well Cores/Samples Information:
Name
Start
Interval
Stop
Sent
Received
Dataset
Number Comments
ADDITIONAL INFORMATION
DATA SUBMITTAL COMPLIANCE REPORT
6/312003
Permit to Drill 2010650 Well Name/No. PRUDHOE BAY UNIT G-25A
Operator BP EXPLORATION (ALASKA) INC
MD 12391 TVD 8949
Well Cored? Y/~.~)
Chips Received?
Analysis
R ~.c~.iv~.d ?
Completion Dat 5/29/2001
Completion Statu 1-OIL Current Status 1-OIL
Daily History Received? (~ N
Formation Tops ~)/N
APl No. 50-029-21652-01-00
UIC N
Comments:
Compliance Reviewed By:
Date:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X
ADD PER FS Pull tubing _ Alter casing _ Repair well _ Other _
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchora~le, AK 99519-6612
4. Location of well at surface
2617' FNL, 1972' FEL, Sec. 12, T11N, R13E, UM
At top of productive interval
2775' FNL, 2635' FEL, Sec. 07, T11N, R14E, UM
At effective depth
1909' FNL, 3620' FEL, Sec. 07, T11N, R14E, UM
At total depth
1857' FNL, 3658' FEL, Sec. 07, T11N, R14E, UM
5. Type of Well:
Development __X
Explorato~.__
Stratigraphic__
Service__
(asp's 658255, 5969032)
~sp~ 66251~ 596896~
(asp's 661505, 5969810)
~sp~ 661465, 5969861)
6. Datum elevation (DF or KB feet)
RKB 72 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
G-25A
9. Permit number / approval number
201-065
10. APl number
50-029-21652-01
11. Field / Pool
Prudhoe Bay Field / Prudhoe Bay Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 110'
Surface 2746'
Intermediate 9688'
Liner 707'
Sidetrack Liner 3009'
12391 feet Plugs (measured)
8949 feet
12326 feet Junk (measured)
8953 feet
Size Cemented Measured Depth True Vertical Depth
20" 72 cf Concrete 149' 149'
13-3/8" 3890 cf Permafrost 2785' 2685'
9-5/8" 590 cf Class 'G' 9724' 8337'
5-1/2" 484 cf Class 'G' 9462' - 10169' 8113' - 8723'
3-3/16' x 2-7/8" 146 cf Class 'G' 9382' - 12391' 8044' - 8949'
Perforation depth:
measured Open Perfs 10750'-10825', 11440'-11530', 11590'-11790', 11840'-12080', 12180'-12320'
true vertical Open Perfs 8916'-8918', 8968'-8976', 8978'-8979', 8978'-8968', 8963'-8953'
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, TBG @ 9322' MD; 4-1/2", 12.6#, L-80, Tu~n~ ~,..~ l,~i'¢h
Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" TIW Packer @ 9322'.
4-1/2" Otis SSSV Landing Nipple @ 2072' MD. ,.,,.,-,.
13. Stimulation or cement squeeze summary U~,I 0 ~ 2002
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
Alas Oil,& Gas G°ns. Commission
Anchorage
14.
OiI-Bbl
Representative Daily Avera.qe Production or Iniection Data
Gas-Mcr Water-Bbl Casing Pressure
Prior to well operation Shut-In
Subsequent to operation 09/21/2002 1592 32263
15. Attachments
Copies of Logs and Surveys run _
Daily Report of Well Operations _
17. I hereby certify that the foregoing is true. and correct to the best of my knowledge.
DeWayne R. Schnt~rr
26
16. Status of well classification as:
Oil __X Gas __ Suspended _ Service
Tubing Pressure
822
Date September 23, ,2002.
Prepared by DeWar/ne R. Schnorr 564-5174
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
.
G-25A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
O8/2O/2OO2
O9/O3/2OO2
09/04/2002
PERFORATING: DRIFT/TAG
PERFORATING: PERFORATING
PERFORATING: PERFORATING
EVENT SUMMARY
08/20/02
DRIFTED W/2" DUMMY GUN SAT DOWN @ 10184' SLM, WORKED THROUGH
AND TAGGED @ 10292' SLM.
O9/O3/02
RIH WITH 2" JET SWIRL NOZZLE, 6' STINGER, DUAL CHECKS AND 2" ROLL ON
CONNECTOR. CLEANED TO PBTD @ 12310', (HARD TAG). POOH. RUN MEM
GR/CCL FOR COIL FLAG. FLAG PIPE @ 10900'. CORRECTED EOP AT FLAG =
10906'. RIH WITH GUN RUN #1 & PERFORATED INTERVAL 10800'- 10825'.
OOH, ASF. RIH WITH 2ND GUN ASSEMBLY AND PERFORATED INTERVAL
FROM 10800'- 10775'. OOH, ASF. RIH WITH 3RD GUN ASSEMBLY.
O9/O4/O2
PERFORATED FROM 10775'-10750'. OOH, ASF. GUN INFORMATION: 2" HSD
2006 PJ, 6 SPPF, 60 DEGREE PHASING. RIH WITH 2" NOZZLE AND DISPLACED
WELLBORE TO CRUDE. WELL NOT FLOWING. DSO NOTIFIED AND TIGER
TANK LEFT IN PLACE. RD/MO. <<< JOB COMPLETED >>>
Fluids Pumped
BBLS
1 PRESSURE TEST SURFACE PRESSURE EQUIPMENT (1 TEST)
40 50/50 METHANOL WATER
497 2% KCL WATER
538 TOTAL
ADD PERFS
09/03-04/2002
THE FOLLOWING INTERVALS WERE PERFORATED USING THE 3-3/8" POWERJET GUN,
LOADED @ 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION.
10750' - 10825'
Page 1
WELL LOG
TRAIVSMI AL
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7~St~eet
Suite # 700
Anchorage, Alaska 99501
RE' Distribution - Final Print[s]
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of'
Joey Burton/Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O, Box 1369
Stafford, TX 77497
BP Exploration [Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
LOG DIGITAL' MYLAR / BLUE LINE REpoRT...
WELL DATE TYPE OR SEPIA PRINT[ S ] OR
CD-ROM FILM COLOR
Open Hole I I 1
........... Res. Eval."cH .... I ...... I 1 '"
, ,
G-25A 9/3/02 Mech. cH 1
, , ~
CaliPer SurVey ..................
Signed'
Print Name:
Date'
ProActive Diagnostic Services, Inc., 310 K Street Suite 200, Anchorage, AK 99501
?hone:(90?) 245-895 ! ~'a×:(907) 245-$~$2 E-mail: Pdsanchorage~memoryjog.com Website: ww~. mCmo~.'log, com
To:
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
January. 21, 2002
MWD Formation Evaluation Logs G-25A & G-25A PB1 & PB2 AK-MW-10156
G-25A:
Digital Log Images:
50-029-21652-01
G-25A PBI:
Digital Log Images:
50-029-21652-70
G-25A PB2:
Distal Log Images:
50-029-21652-71
1 CD Rom
1 CiD Rom
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY' SIGNING AND iR'ETURNIN'G THE ATTACHED
COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION' OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (.Alaska) Inc.
Petro-technical Data Center, LR2-1
900 E. iBenson Blvd.
Anchorage, Alaska 99508
RECEIVED
20022
,-~i'" :.. ',9
Ataska Oil & Gas Co~s. Commissior~
Anchorage
Signed~~ ~
!
WELL LOG TRANSMITI'AL
To~
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Lisa Weepie
333 West 7~' Avenue, Suite 100
Anchorage, Alaska
RE: MWD Formation Evaluation Logs G-25A, AK-MW- 10156
December 21,2001
1 LDWG formatted Disc with verification listing.
API#: 50-029-21652-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING ANi) RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Cemer LR2-1
900 iE. Benson Blvd.
Anchorage, Alaska 99508
Date:
RE£.,EiVED
WiELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
December 21,2001
RE: MWD Formation Evaluation Logs G-25A PB2, AK-MW-10156
1 LDWG formatted Disc with verification listing.
API#: 50-029-21652-71
PLEASE ACKNOWLEI)GE RECEIPT BY SIGNING ANI) RETURNING. A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
iBP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
WELL LOG TRANSMITTAL
To.'
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
December 21,2001
RE: MWD Formation Evaluation Logs G-25A PB1, AK-MW- 10156
1 LDWG formatted Disc with verification listing.
API#: 50-029-21652-70
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION' OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Cemer LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
DEC 2 8 2001
~Jaska Oil & Gas Co~s.
A,nc~orsge
07/23/01
11:12 FAX 907 564 5193
BI' EXPLORATI ON
~] OOl.
TO:
COMPANY:
LOCATION:
Steve Davies
Alaska OI! & Gas Conservation Commission
__
Anchorage FAX #: 276-7542
FROM:
LOCATION:
Terrie Hubble
I
ALASKA DRILLING & WELLS
ANCHORAGE, ALASKA
PAGES TO FOLLOW: 2
!
COMMENTS: Hi' Steve,
PHONE #:
DATE:
564-4628
07-23-01
I don't understand why this Is happening. One time I'll print the
report and get it all, the next time I'll only get part. I'll try to
watch for this even more carefully. But, thanks for catching it!
Terrie
RECEIVED
JUL 2 3 2001
Alasl(a Oil & Gas Oons. OollilltlS~
Anchorage
IF YOU DO NOT RECEIVE ALL PAGES, OR HAVE ANY PROBLEMS,
PLEASE CALL THE FOLLOWING NUMBER:
(907) 564-4628
'II~ STATE Of ALASKA
ALAS oIL AND GAS CONSERVATION COM ~dSlON
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service [] TSUSP
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-065
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21652-01
4. Location of well at surface !~'~,~'P-LE'ri¢~,,~-~ ~ t 9. Unit or Lease Name
2617' SNL, 1973' WEL, SEC. 12, T11N, R13E, UM ! L,\TE t_~,j~_' I.~. ~ Prudhoe Bay Unit
At top of productive interval ! ~_2.~,.C._.>jI ~ !}
2775' SNL, 2282' EWL, SEC. 07, T11N, R14E, UM { '~;'~.¢-,'.IFI~:~ ,~ . 10. Well Number
At total depth .. ~ G-25A
1857' SNL, 1254' EWL, SEC. 07, T11 N, R14E, UM ,-_~ __..,.(Z)_....._ ........ ,.i ,z
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Se¢i~t~ No: ...... ~; , 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 72.40 ADL 028304
12. Date Spudded 5/11/2001 110' Date T'D' Reached 114' Date c°mp'' Susp'' °r Aband'5/26/2001 5/20/2001 115' water depth' if °fish°re N/A MSL 116' N°' °f c°mpleti°ns One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV setI 21. Thickness of Permafrost
12391 8949 FTI 12326 8953 FTI [] Yes [] NoI (Nipple) 2O74' MDI 1900' (Approx.)
122. Type Electric or Other Logs Run
CNL, GR
23. CASINGr LINER AND CEMENTING RECORD
CASING SE'I-rING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" Insulated Conductor Surface 110' 26" 9 cu yds Concrete
13-3/8" 72# L-80 / S-95 39' 2785' 17-1/2" 3890 cu ft Permafrost
9-5/8" 47# L-80 36' 9724' 12-1/4" 590 cu ft Class 'G'
5-1/2" 17# L-80 9462' 10169' 8-1/2" 484 cu ft Class 'G'
3-3/16"x 2-7/8" 6.2# / 6.16# L'80 9382' 12391' 3-3/4" 146 CU ft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
2" Gun Diameter, 4 spf 4-1/2", 12.6#, L-80 9465' 9322'
MD TVD MD TVD
11440' - 11530' 8968' - 8976'
11590' - 11790' 8978' - 8979' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
11840' - 12080' 8978' - 8968' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
12180' - 12320' 8963' - 8953' 2000' Freeze Protect with 30 Bbls of 60/40 MeOH
,
, , ,
,, , , ,, ,
, ,
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
June 5, 2001 Flowing
Date of Test Hours Tested PRODUCTION FOR OIL'BBL GAS'MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
6/13/2001 4 TEST PERIOD 700 8746 15 94.18I 1 2495
Flow Tubing Casing Pressure CALCULATED OIL'BBL GAS'MCF WATER-BBL OIL GRAVITY'API (CORR)
Press. 24-Hour RATE 26.2
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. EC[IYED
JUL 1 ;3 2001
Alaska 0/! & Gas Cons. Commission
ORI6INAL ,.
Form 10-407 Rev. 07-01-80 G ~ Submit In Duplicate
29.
Marker Name
21N
21P
Zone 1 B / 14N
14P
31. List of Attachments:
Geologic Markers
Measured
Depth
10414'
10424'
10978'
11 O78'
Summary of Daily Drilli-~g Re
True Vertical
Depth
8877'
8881'
8936'
8953'
)orts, Surveys
30.
Formation Tests
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
RECEIVED
JUL 1 2.001
Alaska 0il & Gas Co'ns. Commission
Anchorage
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed
TerrieHubble ~~L~~~.' Title Technical Assistan, Date
G-25A 201-065
Well Number Permit No. / A,~..~roval No. Prepared By Name/Number: Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL; This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska.
ITEta 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM IS: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28-' If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
BP EXPLORATION Page 1 of 12
Operations Summary Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/9/2001 03:00 - 00:00 21.00 MOB X WAIT PRE Nippled down on G-29A, can't move to G-25, waiting on rig
down of sqz eq. and pad prep.
5/10/2001 00:00 - 02:00 2.00 MOB X WAIT PRE Standby on well prep. Off standby at 02:00.
02:00 - 03:30 1.50 MOB P PRE Move RIG to G-25A from G-29A. MIRU. Nipple up to top of
swab valve.
ACCEPT RIG ON G-25A AT 03:30 HRS, 05-10-01.
03:00 - 07:00 4.00 MOB P PRE Continue rig up operations. Spot green tank and tiger tank for
gas venting.
07:00 - 12:00 5.00 BOPSUR P DECOMP BOP testing for rig up on new well. Witness by State of
Alaska, Chuck Sheve.
12:00 - 13:30 1.50 BOPSUR P DECOMP Leaking wing valve, wait on grease crew. Grease swab and
cycle. Grease master and wing, no cycle. Bleed down flowline
pressure to tiger tank.
13:30 - 15:15 1.75 BOPSUR P DECOMP Resume BOP test.
15:15 - 16:30 1.25 STWHIP P WEXlT BOP test completed ok. Test inner reel valve. Rehead coil,
change packoffs.
16:30 - 17:00 0.50 STWHIP P WEXlT Make up BHA #1, to mill XN nipple and window.
17:00-18:45 1.75 STWHIP P WEXlT RIHwithBHA#1. Tag XN nipple at 9407 ft. Correct to 9414 ft
BKB.
18:45 - 19:30 0.75 S'I'WHIP P WEXIT Mill out XN nipple to 3.80". [15 min.], Back ream and ream
down several times to get rid of motor work.
19:30 - 19:40 0.17 STWHIP P WEXIT RIH tag Whipstock at 10168 ft. Correct depth to 10,169 ft.
19:40 - 22:40 3.00 STVVHIP P WEXIT Mill window with 3.80" diamond mill. 2.5 BPM, 1400 psi,
Several stalls at start. Mill 10169 - 10171.2 ft.
22:40 - 00:00 1.33 STVVHIP P WEXIT Milling window from 10171.2 -10172.7 ft. 2.6 bpm, 1650 psi. ~l
5/11/2001 00:00 - 01:00 1.00 STWHIP P WEXIT .Mill window to 10173 ft. Looks like exited casing. Mill slow to
10175 ft to work string reamer in window.
01:00 - 01:15 0.25 STWHIP P WEXIT Safety Meeting, Review all procedures of mud swap with Peak
and crew
01:15 - 02:30 1.25 STVVHIP P WEXIT Mill formation to 10,182 ft. Slow milling formation. Swap to
FIoPro used mud system. Dispose of Biozan water.
02:30 - 05:00 2.50 STVVHIP P WEXIT Ream window area several times. 0.2 - 0.5 FPM up and down.
2.5 bpm, 2550 psi. full returns. FIoPro system in place. No
motor work thu window.
RIH with no pump, no wt loss thru window.
05:00 - 06:40 1.67 STWHIP P WEXIT POOH. Flag CT at 10,000 ft EOP. POOH.
06:40 - 08:00 1.33 STWHIP P WEXIT Tag up at surface. Rig down milling BHA, pick up build section
BHA. Mill and string reamer guaged at 3.77".
08:00 - 08:15 0.25 DRILL P PROD1 RIH with BHA #2, first drilling BHA to drill build section. RIH
with 2.3 deg short radius motor and Smith M09 bit.
08:15 - 08:45 0.50 DRILL N SF^L PROD1 Shallow hole test of MWD eq at 500'. MWD works fine. Leak
at lubricator o ring at rig floor. Pull back to surface, break off
lubricator, change o ring
08:45 '- 10:10 1.42 DRILL P PROD1 RIH with BHA #2.
10:10 - 10:40 0.50 DRILL P PROD1 Fire and evacuation drill.
10:40 - 10:50 0.17 DRILL P PROD1 Resume RIH.
10:50 - 10:55 0.08 DRILL P PROD1 Stop at EOP flag from last run. Found flag at 10054.5'. Should
be 10066.35' (10000' EOP flag + BHA length of 66.35') Make
+11.5' correction. Kick on pumps, to find tool face.
10:55 - 12:00 1.08 DRILL P PROD1 Ran through the window slick with tool face of 103R. Tagged
bottom on depth to mill run at 10182'. Kicked on the pumps,
pumping 2.7 bpm in, 1 for 1 returns, park at 10178', orient
arount to 34R, begin drilling at 40 fph, with only 100 lbs motor
Printed: 5/29/2001 1:35:32 PM
· ,
BP EXPLORATION Page 2 of 12
Operations Summar Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/11/2001 10:55- 12:00 1.08 DRILL P PROD1 work.
12:00 - 12:30 0.50 DRILL P PROD1 10228', 12:00 update. Drilling 62 deg R, 2.6 bpm, 1 for 1
returns, 3400 psi, 82 fpm. 3250 psi free spin.
12:30 - 14:15 1.75 DRILL N DPRB PROD1 10241', Sperry MWD failed. Can't get pulses. POOH. Hung
up at window. Orient around blind to attempt to get through
window. Took 6 clicks, still couldn't get through the window.
Took 3 clicks, pull up, still hung up. Only pulling 10klbs over.
Not pulling max. Take 3 more clilcks, hung up again. Take 3
more clicks, hung up. Try 3 more clicks, hung up, pulled
60klbs, couldn't get through. Dropped down, pulled 70klbs,
couldn't get through. Dropped down, kicked pumps on to 2.6
bpm. Pulled up, hung up. Tried at 1.0 bpm, hung up. Get 3
more clicks hung up coming up, can't RIH. Work free. Pull
80klbs, no good. Cointinue to work pipe. Hung up, can't pull
up or down. Pull 90klbs multiple times. Can't get free.
14:15 - 15:15 1.00 DRILL N DPRB PROD1 Worked BHA free. Try orienting around. Taking 2 clicks, then
pulling up to window. Holding 2000 psi on coil when picking up
to lock orienter. Keep repeating until we try 360 deg in 40 deg
increments.
15:15 - 16:30 1.25 DRILL N DPRB PROD1 MWD started working again. TF now reading 78L, attempt to
orient around to 45 R. Pick up at 62 R. Tag up. Continue to
work pipe.
16:30 - 17:30 1.00 DRILL N DPRB PROD1 Attempt to time mill back up through the window at 2'/hr.
Starting at 10156.1' (Not corrected for ail the stretch, this is in
the window).
17:30 - 19:00 1.50 DRILL N DPRB PROD1 Milling up at 10155.6', got several stalls at this depth (Note, not
tied in due to stretch from working coil. This is the top of the
whipstock however.) Continued time back reaming up to
10154.8 ft. PULLED FREE with 10K overpull.
19:00 - 21:00 2.00 DRILL N DFAL PROD1 POOH. Flag CT at 9700ft EOP. [ Rig down time for MWD
failure.]
21:00 - 22:00 1.00 DRILL N DFAL PROD1 Change out BHA. Bit came out 0.20" UG. Gauge worn down
from back reaming.
M/U 3.80" taper mill, 3.80" string reamer, 1.0 deg motor and
new MWD.
[Rig down time.]
22:00 - 22:15 0.25 DRILL P PROD1 SAFETY MEETING, Review procedure / hazards for cutting
CT and rehead.
22:15-23:00 0.75 DRILL P PROD1 Cut off 350 ft of CT. Rehead, pulltestand presstest.
23:00 - 00:00 1.00 DRILL N DFAL i PROD1 RIH with milling BHA to ream window. Shallow test MWD. [rig
down time].
5/12/2001 00:00 - 01:00 1.00 DRILL N DPRB PROD1 RIH with reaming BHA, Correct depth at flag. Orient TF to
35R. [rig down time].
01:00 - 03:45 2.75 DRILL N DPRB PROD1 Ream window, correct depth to top window at first stall. [+6 ft].
Ream down at 2 FPH with 20R TF, 2.5 bpm, 3300 psi, Had
motorwork from 10169-10172.5 ft.. 2 stalls total. Ream 10173
- 10183' clean. Back ream.
03:45 - 05:15 1.50 DRILL N DPRB PROD1 Ream down 80R TF. Very little motor work [50 psi]. Back
ream.
Ream down 120R TF. Very little motor work. Back ream.
Ream down 20L TF. Llittle motor work [100 psi]. Back ream.
Ream down 20R TF. No motor work. Back ream.
! Ream down 40R TF. No motor work. Ream down to 10185 ft.
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 3 of 12
Operations Summa Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/12/2001 03:45 - 05:15 1.50 DRILL N DPRB PROD1 Hole clean.
05:15 - 06:40 1.42 DRILL N DPRB PROD1 POOH.
06:40 - 07:45 1.08 DRILL N DPRB PROD1 Tag up at surface. Lay down BHA #3, found mill and string
reamer in guage at 3.80". Make up BHA #4 to continue drilling
build section.
07:45 - 09:30 1.75 DRILL N DPRB PROD1 RIH with BHA ~ to resume drilling build section, shallow hole
test at 500' while RIH, passed ok.
09:30 - 09:50 0.33 DRILL N DPRB PROD1 Kick on pumps, check orientation. It is 37R. Drop pumps to
minimum, run down through window and then back up with
BHA. Able to run up and down with no problems.
09:50 - 10:25 0.58 DRILL N DPRB PROD1 Log tie in pass accross gamma spike from RA tag at 10179'
ELMD. Make +13' correction.
10:25 - 12:30 2.08 DRILL P PROD1 Tag at 10244.5', pick up orient 2 clicks, begin drilling at 2.5
bpm, 1 for 1 returns. 3300 psi. Very grabby and difficult to get
to drill. Geologist reports both 30% Chert and some pyrite in
last cutting sample.
12:30 - 14:00 1.50 DRILL N DFAL PROD1 10264', MWD tool failed again. CTP = 3900 psi. Same
symptoms as yesterday. POOH to change out tool. Pulled
through window blind with no problems. Tried cycling tool in
casing, couldn't get any pulses. Continue to POH.
14:00 - 16:15 2.25 DRILL N DFAL PROD1 Tag up at surface, change out MWD. Found a couple of
broken teeth on face of bit. Found severe scoring on body of
bit behind cutter surfaces. Scoring was so bad it removed all
pipe wrench marks and serial numbers. Also found motor
untorqued, and about to come apart. Order new motor from
deadhorse.
16:15 - 18:05 1.83 DRILL N DFAL PROD1 RIH with BHA #5, 2.3 deg short radius motor with tri cone bit.
Shallow hole test at 500', pumping at 2.5 bpm, CTP = 3150.
this is. significantly lower than on the last run.
18:05 - 18:20 0.25 DRILL N DFAL PROD1 Orienting to run through window. Orientation 28 R, Add 10',
Run down through window. No problems RIH.
18:20 - 18:45 0.42 DRILL N DFAL PROD1 Log tie in accross PA, tag in whipstock anchor. Pumping 2.5
bpm, ctp 3400 psi free spin. Add 5 ft to CTD.
18:45-21:30 2.75 DRILL P PROD1 Drilling, TF=70R. Slow drilling, ROP=20-30FPH, 2.5bpm,
3400 psi.
Drilled to 10,303 ft.
21:30 - 00:00 2.50 DRILL P PROD1 Drilling, TF = 90R, ROP = 30-60 FPH. 2.5 bpm, 3400 psi.
Drilled to 10,381 ft. Total of 4 hours drilling, bit on bottom.
Starting to stall.
Ready to pull for bit. Total of 4 drilling hours on bit.
5/13/2001 00:00 - 01:30 1.50 DRILL P PROD1 POOH for bit. Total of 4 drilling hours on bit, 5 rotating hrs. Bit
starting to stall.
01:30 - 01:45 0.25 DRILL P PROD1 Change out bit. [bit grade: 6-7-BT-A-6-I-LT] Check motor
orientation - OK.
01:45 - 03:30 1.75 DRILL P PROD1 RIH with BHA #6, 2.3 deg SR motor and M09 bit #6.
03:30 - 03:45 0.25 DRILL P PROD1 Log tie-in, total correction of +12 ft CTD.
03:45 - 04:00 0.25 DRILL P PROD1 Orient TF and RIH.
04:00 - 04:30 0.50 DRILL P PROD1 Ream Undergauge hole from 10320 - 10381 ft.
04:30-05:20 0.83 DRILL P PROD1 Drilling, TF= 112R, 2.5 bpm, 3400 psi, ROP= 110 FPH. Incl
= 62.5 deg.
Drilled to 10,458 ft.
05:20 - 06:30 1.17 DRILL P PROD1 Pull to window and orient around. RIH. Hole was clean.
06:30 - 07:00 0.50 DRILL P PROD1 10458', 06:30 Update. Drilling ahead in sand 2.5 bpm, 3700
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 4 of 12
Operations Summa Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
'5/13/2001 06:30 - 07:00 0.50 DRILL 3 PROD1 3si, 1 for 1 returns.
07:00 - 07:20 0.33 DRILL 3 PROD1 Orient 1 click.
07:20 - 09:00 1.67 DRILL 3 PROD1 10525', return to drilling.
09:00 - 11:40 2.67 DRILL 3 PROD1 10546', 09:00 update. Drilling ahead, entering 14N shale.
ReP down to 15 fph.
11:40 - 12:05 0.42 DRILL 3 PROD1 10600', short trip to window. Clean pickup off bottom at 37klbs.
12:05 - 15:00 2.92 DRILL ~ PROD1 Resume drilling, 2.5 bpm, 3600 psi, 1 for 1 returns. Land hole
at 10700', Inc=77 deg.
15:00 - 16:00 1.00 DRILL 3 PROD1 10700', Wiper trip.
16:00 - 17:30 1.50 DRILL 3 PROD1 Orienting. Having difficulty getting clicks in build section,
having to pick back up and orient just below shoe.
17:30 - 18:15 0.75 DRILL P PROD1 On bottom, BHA flopped around, while trying to get a click, got
a heavy pickup. Make wiper trip to shoe. Draggy up through
shales. Popped free at 10550'. Need to watch the shales.
Clean while RIH.
18:15 - 19:15 1.00 DRILL P PROD1 Back on bottom, tool face 45R while RIH. Tagged bottom and
it flopped around to 103R. Pick back up to vertial section of
hole to orient.
19:15 - 22:00 2.75 DRILL P PROD1 Drilling, TF = 35R. 3400 psi, 2.4 bpm. Drill to 10720 ft.
Orient.
Drilling, TF = 80R. 3400 psi, 2.4 bpm. Drill to 10740 ft.
Orient.
Drilling, TF=100R. 3400 psi, 2.4 bpm. Drill to 10781 ft.
Well landed at 10,781 ft, 8897ft TVDSS, 90.0 deg Incl.
22:00 - 00:00 2.00 DRILL P PROD1 POOH for less bend motor. 10K overpull in shale at 10600 ft.
5/14/2001 00:00 - 00:45 0.75 DRILL P PROD1 CIO MWD, remove shock sub, M/U 1.1 deg motor and DS49
bit #7 [used]
00:45 - 02:30 1.75 DRILL ~P PROD1 RIH with BHA #7, Shallow test Sperry tools. RIH.
02:30 - 03:00 0.50 DRILL P PROD1 Log tie-in with RA tag at 10,179 ft. +12 ft CTD.
03:00 - 04:10 1.17 DRILL P PROD1 RIH, ream shales from 10520 - 10640 ft. RIH.
04:10 - 04:30 0.33 DRILL P PROD1 Orient TF.
04:30 - 05:15 0.75 DRILL P PROD1 Drilling, TF -- 115R, 50 fph, 2.4 bpm, 3400 psi. Drilled to
10813 ft.
05:15 - 06:30 1.25 DRILL P PROD1 Attempt to Orient TF. Tried several times near bottom with no
success.
06:30 - 07:45 1.25 DRILL P PROD1 10781', resume drilling, 2.4 bpm, 3700 psi, TF 123R, 1 for 1
returns.
07:45 - 08:00 0.25 DRILL P PROD1 Orienting in horizontal section of hole. Getting every other click
on orienter. Begining mud swap.
08:00 - 08:45 0.75 DRILL P PROD1 10860', resume drilling
08:45 - 09:05 0.33 DRILL P PROD1 New mud around, free spin 3000 psi. Lost several hundred psi
in friction with new mud. Catch 2 clicks, resume drilling
09:05 - 11:30 2.42 DRILL P PROD1 10901', Short trip to shoe. Overpull at 10650', Had to
backream up through at 10 fpm, seeing some overpulls, not
much motor work. RIH tagged up at 10530', had to work and
ream back down. Made 3 trips through interval at a tool face of
45R and finally cleaned it up.
11:30 - 15:30 4.00 DRILL P PROD1 10901', Resume drilling. 2.5 bpm, 3600 psi, 1 for 1 returns, 62
L TF, 80 fph.
15:30 - 16:30 1.00 DRILL P PROD1 11041', wiper trip to shoe. Small pull at 10550', nothing
compared to what we had this morning.
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 5 of 12
Operations Summa Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/14/2001 16:30 - 18:45 2.25~ DRILL P I PROD1 11041', Resume drilling. 2.6 bpm, 3500 psi, 1 for 1 returns. 50
fph.
Drilled to 11,138 ft.
18:45-20:00 1.25 DRILL P PROD1 Drilling, TF=76R. 2.4bpm, 3000psi, Drilled to11,173 ft.
Drilling, TF = 105R, 2.6 bpm, 3500 psi, Drilled to 11,200 ft.
20:00 - 21:00 1.00 DRILL P PROD1 Wiper trip to window.
21:00 - 22:30 1.50 DRILL P PROD1 Log Tie-in with RA marker. Log up and tie-in RA marker with
OH log. +9ft.
22:30 - 23:30 1.00 DRILL P PROD1 RIH and ream shales.
23:30 - 23:50 0.33 DRILL P PROD1 Drilling, TF = 90R, 2.5 bpm, 3500 psi, Drilling sand finally.
Drilled to 11,233 ft
23:50 - 00:00 0.17 DRILL P PROD1 Orient TF around.
5/15/2001 00:00 - 00:10 0.17 DRILL P PROD1 Orient TF
00:10 - 02:30 2.33 DRILL P PROD1 Drilling, TF = 80-90 R. 2.5 bpm, 3200 psi. Still drilling dirty
sands at 60-70 APl GR. Drill to 11,350 ft.
02:30 - 05:15 2.75 DRILL P PROD1 Wiper trip to window. Easy up thru shales. RIH, unable to get
past 10,580 ft. Unable to orient TF to 90R in high bend
section. Pull to window and orient. RIH.
Bounce past ledge at 10580 ft with 90R TF. RIH.
05:15 - 06:00 0.75 DRILL P PROD1 Drilling, TF = 35L, will build Incl back up to 95 deg. to drill 20'
higher in vertical section. 2.4 bpm, 3200 psi. Full returns. Drill
to 11,410 ft.
06:00 - 07:10 1.17 DRILL P PROD1 11440', 06:45 update. Drilling 2.4 bpm in, 1 for 1 returns. 3500
psi.
Drilled to 11453 ft.
07:10 - 09:25 2.25 DRILL P PROD1 Short trip to shoe. Got significant motor work and drag at
10565'-10550' on way up. Clean above and below this point.
RIH at 14R TF, and tagged up and got motor work at 10580'.
Orient to 80R, could not get through trouble spot, Orient to
96R, (Hole drilled at 100R), RIH at high speed, pumps off, and
tagged up at 10575', then popped through.
09:25 - 10:00 0.58 DRILL N DPRB PROD1 Tried RIH fast at 96R TF, bounce through bad spot at 10565',
hang up at 10580'. Tried several times, can't get past 10580'.
Back ream bad spot at 10575'-10550'. Need to PUH to window
to change out DS swivel.
10:00 - 10:45 0.75 DRILL N RREP PROD1 Swivel leaking on DS reel. PUH to window to change out
swivels.
10:45 - 13:15 2.50 DRILL N DPRB PROD1 RIH, can't get back through 10541'. TF=96R. Pick up to
window and orient to 45L, RIH Flopped around to 167L, Tag
and motor work at 10541', pick up get more clicks. Orient to
176R below window, RIH. Flopped arountto67R. Easily got
past bad spots at 10541', 10565', tagged up at 10580'. Orient
to 90R, can't get past 10580', orient to 160R, RIH tag up at
10580'. Try to get down repeatedly using all techniques.
13:15 - 15:15 2.00 DRILL N DPRB PROD1 POOH to pick up 2.3 deg motor to clean up sticky spot.
15:15 - 16:00 0.75 DRILL N DPRB PROD1 CIO MWD, M/U 2.3 deg SR motor and DS49 Bit #8 RR.
16:00-17:45 1.75 DRILL N DPRB PROD1 RIHwithBHA#8. Shallow test tools. RIH.
17:45 - 18:15 0.50 DRILL N DPRB PROD1 Thru window ok. RIH. Tag up at 10576'
18:15 - 19:15 1.00 DRILL N DPRB PROD1 Attempt to work past ledge. Work pump & pipe. TF:100R
(same as original hole). Unable to get and deeper.
19:15 - 20:00 0.75 DRILL N DPRB PROD1 Drill ahead to 10629'. SUrvey at 10620' indicates incl:74 deg.
Original hole inc: 77 deg. Sidetracked.
20:00 - 22:00 2.00 DRILL N DPRB PROD1 POOH to inside window to revise well plan.
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 6 of 12
Operations Summary Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
!Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/15/2001 22:00 - 22:45 0.75 DRILL N DPRB PROD1 Scratch the previous plans. Will attempt to continue drilling in
sidetracked hole to land at 8925' TVD at 10820' MD and drill at
the revised depth of 13P (25' TVD deeper).
RIH and set down at 10290' 128R. Orient around to drilled TF
below window. RIH thru 10290' at 77R. Ream hole 10290-628'
slow and was clean to tagged TD, 83R. Official start of ST #2
is 10603'
22:45 - 00:00 1.25 DRILL N DPRB PROD1 Drilling 30-120'/hr 2.5/3500/89R to 10691'
5/16/2001 00:00 - 00:20 0.33 DRILL N DPRB PROD1 Orient around at TD of 10691' to begin build from 70 deg at bit
00:20 - 01:35 1.25 DRILL , N DPRB PROD1 Drilling 40-100'/hr to 10775' 2.4/3450/55R
01:35 - 01:55 0.33 DRILL N DPRB PROD1 Wiper to window 39K. 10-20K overpulls 10590-660'
01:55 - 02:15 0.33 DRILL N DPRB PROD1 Begin tie-in
02:15 - 02:50 0.58 DRILL N DPRB PROD1 Add 7.0', RIH. RIH 16'/min 66R from 10500-TD and hole was
clean
02:50 - 05:30 2.67 DRILL N DPRB PROD1 Drilling 15-40'/hr 2.4/3450/66R from corr TD @ 10779' to
10850'. Est 90 deg at bit at 8924' TVD
05:30 - 05:50 0.33 DRILL N DPRB PROD1 Wiper to window. A few 10k overpulls thru 10520-690'
05:50 - 07:30 1.67 DRILL N DPRB PROD1 POOH for horizontal assy
07:30 - 08:00 0.50 DRILL N DPRB PROD1 Change out motor & bit.
08:00 - 09:45 1.75 DRILL N DPRB PROD1 RIH with 1.3 deg horizontal assy. SliT mwd. Good. COntinue
in hole.
09:45 - 10:00 0.25 DRILL N DPRB PROD1 Log GR tie in at RA tag at 10180'. Add 3' correction (on top of
12'). Hole smooth to 10850'. Two minor bobbles at 10610' &
10630'.
10:00 - 11:00 1.00 DRILL N DPRB PROD1 Drill ahead. 2.4 bpm, 3400 psi, 50 FPH, TF:110R. Drill to
10880'.
11:00 - 11:30 0.50 DRILL N DPRB PROD1 Orient to 90L.
11:30-14:45 3.25 DRILL N DPRB PROD1 Drillahead. 2.4bpm, 3400psi, 40fph, TF:68L. 35k#up, 12k#
down wt. Drill to 11001'.
14:45 - 15:45 1.00 DRILL N DPRB PROD1 Short trip to window. Hole smooth pulling out. Sat down at
10579, 10589'. Able to bump through both with 1.5 bpm & 40
fpm. Rest of hole smooth.
15:45 - 18:45 3.00 DRILL N DPRB PROD1 Drill ahead. 2.4 bpm, 3250 psi fs, 50-70 fph. TF: 90L.
Formation still ratty. Drill to 11100'
18:45 - 20:35 1.83 DRILL N DPRB PROD1 Drilling 20-80'/hr in dirty sand and shale streaks slowly building
angle searching for elusive sand. Drill to 11160' (8934' TVD)
2.6/3560/77L
20:35 - 21:10 0.58 DRILL N DPRB PROD1 Wiper to window-a few minor overpulls
21:10-21:25 0.25 DRILL N DPRB PROD1 Begin tie-in at 10215'
'21:25 - 21:50 0.42 DRILL N DPRB PROD1 Add 11.0', RIH, clean. Start new mud
21:50 - 22:30 0.67 DRILL N DPRB PROD1 Drill 50'/hr avg from 11171-191' 2.5/3500/33L
22:30 - 22:50 0.33 DRILL N DPRB PROD1 Orient around
22:50 - 00:00 1.17 DRILL N DPRB PROD1 Drill to 11240' 2.6/3400/62L. Fin mud swap
5/17/2001 00:00- 00:35 0.58 DRILL N DPRB PROD1 Drilling 50'lhr2.613500151Lto 11275' (still 60-90APl)
00:35 - 00:50 0.25 DRILL N DPRB PROD1 Orient to right side
00:50 - 02:00 1.17 DRILL N DPRB PROD1 Drilling 60'/hr 2.6/3500/73R to 11316'
02:00 - 03:20 1.33 DRILL N DPRB PROD1 Wiper to window. Orient to drilled TF to get by 10590', hole
clean
03:20 - 03:40 0.33 DRILL N DPRB PROD1 Orient to drill on right
03:40 - 04:35 0.92 DRILL N DPRB PROD1 Drilling 2.6/3550/100R to 11365' at 93 deg, 50-70 APl ratty
sand
04:35 - 04:55 0.33 DRILL N DPRB PROD1 Orient around
04:55 - 05:30 0.58 DRILL N DPRB PROD1 Drilling 80'/hr 2.4/3200/90R to 11425' at 91 deg, GR trending
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 7 of 12
Operations Summa Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/17/2001 04:55 - 05:30 0.58 DRILL N DPRB PROD1 lower 30-40 APl
05:30- 05:50 0.33 DRILL N DPRB PROD1 100'wiper
05:50 - 08:00 2.17 DRILL P PROD1 Drilling. Try to hold 100R, but TF keeps flopping around.
Orient multiple times. Drill to 11513'.
08:00 - 09:30 1.50 DRILL P !PROD1 Short trip to window. Hole smooth out. Bobble at 10605' while
RIH. TF:110R, 2.0 bpm, 30 FPH to get through. Rest of hole
PROD1 smooth.
09:30 - 11:30 2.00 DRILL P Drilling ahead. 2.4 bpm, 3400 psi, 50-70 fph. TF:106R. Drill to
11600'.
11:30 - 13:45 2.25 DRILL P PROD1 Drilling ahead. 2.4 bpm, 34300 psi, 40-60 fph. TF:106R. Drill
to 11700'. Still chasing elusive sand. Drilled several stringers
of 40-50 APl rock.
13:45 - 16:30 2.75 DRILL P PROD1 Short trip to window. Hole smooth. RIH. Unable to get below
10590'. Work pipe & vary toolface. POOH to window to orient
around. Try 45R thru 140R (again) Unable to make any
progress past 10590'. Stalling & sitting down.
i16:30- 18:30 2.00 DRILL N DPRB PROD1 POOH for motor.
18:30- 19:30 1.00 DRILL N DPRB PROD1 LD drilling BHA
19:30 - 00:00 4.50 DRILL P PROD1 Weekly BOPE test. AOGCC waived witness
5/18/2001 00:00 - 00:30 0.50 DRILL P PROD1 Fin BOPE test
00:30 - 01:30 1.00 DRILL P PROD1 Replace CTC. PT @ 34K. PT inner reel valve and CTC @
3500 psi
01:30 - 02:30 1.00 DRILL N DPRB PROD1 MU BHA #10 (2.3 deg motor)
02:30 - 03:45 1.25 DRILL N DPRB PROD1 RIH. SHT and MWD not working (on and off). POOH. Rig
downtime starts at 0330 hrs at 2500'
03:45 - 04:45 1.00 DRILL N DFAL PROD1 Change out MWDChange
04:45 - 06:45 2.00 DRILL N DPRB PROD1 RTIH. Off downtime @ 0500 hrs
06:45 -07:15 0.50 DRILL N DPRB PROD1 Add 11' correction atwindow. Orientto 110R. RIH.
07:15 - 11:00 3.75 DRILL N DPRB PROD1 Set down at 10609'. Stall & stack. PU. Drill ahead at 60 fph.
Thru tight spot. Back ream and down ream several times with
110R TF. Sometimes we see motor work, sometimes not.
Running more than 5 fpm results in a stall. Eventually cleaned
up and able to RIH dry. Orient to 130L. Back ream.
11:00 - 13:00 2.00 DRILL N DPRB PROD1 POOH.
13:00- 13:15 0.25 DRILL N DPRB PROD1 LD BHA.
13:15 - 13:30 0.25 DRILL N PROD1 Hold PJSM to cut pipe.
13:30 - 14:00 0.50 DRILL N PROD1 RU & cut 200' coil from reel.
14:00 - 14:15 0.25 DRILL N DPRB PROD1 MU 1.3 motorwith DPI bi-center bit.
14:15- 16:00 1.75 DRILL N DPRB PROD1 RIH. SHT mwd good. Continue in hole. Add 12' at window.
Continue in OH.
16:00- 18:00 2.00 DRILL N DF^L PROD1 Pin hole pipe at 10300'. Mark pipe. POOH. 698K running
feet. Holed at 70% spot (we had just cut pipe to move this spot
down hole). DT start at 1600 hrs
118:00 - 19:00 1.00 DRILL N DFAL !PROD1 LD drilling BHA
19:00 - 20:30 1.50 DRILL N DF^L i PROD1 VVO N2
20:30 - 22:30 2.00 DRILL N DFAL :PROD1 RU DS N2. PT. Displace CT to N2
22:30 - 23:30 1.00 DRILL N DF^L PROD1 Pull CT out of injector and pull onto reel
23:30- 23:45 0.25 DRILL N DFAL PROD1 Safety mtg re: reel changeout
23:45 - 00:00 0.25 DRILL N DF^L PROD1 Remove reel w/Peak 140T crane
5/19/2001 00:00 - 03:30 3.50 DRILL N DFAL PROD1 Pull out used reel and replace w/new HS90, 15700'
03:30 - 07:00 3.50 DRILL N DFAL PROD1 Prep reel and pull to floor. Stab CT
07:00 - 09:30 2.50 DRILL N DF^L PROD1 MU coil connector. Pump dart.58.7 bbls (calculated: 61.6).
Pull & pressure test.
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 8 of 12
Operations Summary Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/19/2001 09:30 - 10:00 0.50 DRILL N DFAL PROD1 Clean out choke manifold & hard line to flow back tank (found
cement chunks in lines). FP same.
10:00 - 10:30 0.50 DRILL N DFAL PROD1 MU lateral BHA (1.3 mtrw/DPI bi bit)
10:30 - 12:30 2.00 DRILL N DFAL PROD1 RIH. SHT mwd good. Continue RIH.
12:30 - 13:00 0.50 DRILL N DFAL PROD1 Log grtie in from 10220'. Add 6' correction. TF:30R.
13:00 - 13:30 0.50 DRILL N DFAL PROD1 Orient to 110R. 2.4 bpm, 3200 psi fs, 15k dn, 35k# up wt.
13:30 - 14:30 1.00 DRILL P PROD1 Circulate in hole. Bobbles at 10535', 10585', & 10605'. Made
through each with out slowing pump or having to PU. Several
ratty spots to TD, but all cleaned up. Tag TD at 11712'.
14:30 - 15:15 0.75 DRILL P PROD1 Orient to 20R.
15:15 - 17:30 2.25 DRILL P PROD1 Drill ahead. 2.4/3200/60-80 fph. TF:20R. Drill to 11835'
17:30 - 18:50 1.33 DRILL ,P PROD1 Short trip to 10650'.
18:50 - 22:00 3.17 DRILL P PROD1 Drilling 2.5/3500/45R building angle to 95 deg looking for the
elusive 13P. Drill to 11967' (8913' TVD)
22:00 - 23:00 1.00 DRILL P PROD1 Wiper to window
23:00 - 23:20 0.33 DRILL P PROD1 Tie-in, add 11.0'
23:20 - 23:50 0.50 DRILL P PROD1 RIH to 10500' at 22R. Orient to 75R and had a few minor
bobbles thru 10560-645' at normal wiper speed
23:50 - 00:00 0.17 DRILL P PROD1 RIH
5/20/2001 00:00 - 00:40 0.67 DRILL P PROD1 RIH to 11974' CTD
00:40 - 01:10 0.50 DRILL P PROD1 Orient around
01:10 - 02:30 1.33 DRILL P PROD1 Drilling 2.5/3300/77L
02:30 - 03:30 1.00 DRILL N RREP PROD1 Drill to 12038'. Pump #1 blew packing. Switch to pump #2 and
acts like broke a rod. PUH slow while WO backup pump or
repairs on #1 filling w/charge
03:30 - 04:45 1.25 DRILL N RREP PROD1 Get pump #1 back on line. Continue PUH slow. Work on #2
04:45 - 06:00 1.25 DRILL N RREP PROD1 Assume problem is with bull wheel. WO backup pump from
DS. POOH to window
06:00 - 08:00 2.00 DRILL N RREP PROD1 Park at window. Cir¢ at min. WO backup pump and
replacement reel swivel
08:00 - 10:00 2.00 DRILL N RREP PROD1 Spot and RU Kitty Frac pump. Continue to repair #2.
10:00 - 12:00 2.00 DRILL N RREP PROD1 Install rebuilt swivel on reel. Unable to get it to rotate freely.
#2 pump repaired. (recently installed pony rod too long)
12:00 - 16:00 4.00 DRILL N RREP PROD1 Rebuild original swivel at DS shop. Install same.
16:00 - 16:30 0.50 DRILL N RREP PROD1 Log GR tie in. Add 4' correction.
16:30 - 17:30 1.00 DRILL P PROD1 Orient to 110R. Had to POOH to 10200' to get clicks.
17:30 - 18:00 0.50 DRILL P PROD1 RIH. Entire build and horizontal very smooth. Tag TD at
12038' CTD
18:00- 18:30 0.50 DRILL P PROD1 Orient
18:30 - 19:30 1.00 DRILL P PROD1 Drilling 2.5/3500/77L. Got into some fast digging at 12060'
(8900' TVD), but GR did not confirm as 13P
19:30 - 19:50 0.33 DRILL P PROD1 Orient around
19:50 - 20:20 0.50 DRILL P PROD1 Drilling from 12100', adding 200 bbls new mud. Holding 95 deg
20:20 - 20:40 0.33 DRILL P PROD1 Orient around to hold 91 deg. Looks like 12110' could be start
of 13P
20:40 - 21:30 0.83 DRILL P PROD1 Drill 2.4/3200/90R to 12192'
21:30-22:40 1.17 DRILL P PROD1 Got out of sand at 12150'. Stacking. Wiper to window
22:40 - 22:50 0.17 DRILL P PROD1 Tie-in, add 5.0'
22:50 - 00:00 1.17 DRILL P PROD1 RIH to TD at 12192' CTD
5/21/2001 00:00 - 02:15 2.25 DRILL P PROD1 Drilling, try to hold 91 deg. 2.4/3350/60L
02:15 - 02:30 0.25 DRILL P PROD1 200' wiper from 12303'
02:30 - 02:45 0.25 DRILL P PROD1 Orient around
·
02:45 - 03:10 0.42 DRILL P PROD1 Drilling 2.5/3400/100L to 12327'. Stacking, pulling heavy.' In
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 9 of 12
Operations Summary Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
~Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/21/2001 02:45 - 03:10 0.42 DRILL ,P PROD1 and mostly out of sands. Can't push much further
03:10 - 04:20 1.17 DRILL ~P PROD1 Wiper to window
04:20 - 04:35 0.25 DRILL P PROD1 Tie-in, add 7.0'
04:35 - 05:45 1.17 DRILL P PROD1 RIH
05:45 - 06:00 0.25 DRILL P PROD1 Tag at 12328' CTD. Orient to right
06:00 - 06:45 0.75 DRILL P PROD1 Drilling 2.4/3470/90R Drill to 12390'.
06:45 - 07:00 0.25 DRILL P PROD1 Orient to 35R to "resume" climb.
07:00 - 08:00 1.00 DRILL P PROD1 Drilling 2.4/3460/30R. Drill to 12435'. Weight transfer getting
very poor.
08:00 - 09:00 1.00 DRILL P PROD1 Wiper trip. Coil pressure dropped from 3400 psi to 2400 psi
abruptly.
09:00 - 11:00 2.00 DRILL N DFAL PROD1 POOH to inspect BHA.
11:00 - 11:30 0.50 DRILL N DFAL PROD1 Stand back BHA. Left bit, motor, equalizing sub in hole. CSH
pip broke at top of equalizing sub.
11:30 - 13:30 2.00 DRILL N DFAL PROD1 Wait on orders to proceed.
13:30 - 14:00 0.50 DRILL N DPRB PROD1 MU cementing BHA assy (cc, disc, 2 jts PH-6, nozzle)
14:00 - 16:15 2.25 DRILL N DPRB PROD1 RIH with nozzle. Run past "bad" section to 10650'. One
bounce at 10,520'. Made it past without having to PU.
16:15- 18:30 2.25 DRILL N DPRB PROD1 Standby for water & dirty vac truck. RU cementers.
18:30 - 18:45 0.25 DRILL N DPRB PROD1 Safety mtg re: cmting
18:45 - 19:20 0.58 DRILL N DPRB PROD1 RIH to 11250' and hang out while DS prime up and PT
19:20 - 19:40 0.33 DRILL N DPRB PROD1 DS load CTw/15 bbls 17.0 ppg G cement 1.0/1680, 1.0/2050
19:40 - 20:00 0.33 DRILL N DPRB PROD1 Displace w/rig mud 2.613530
20:00 - 20:25 0.42 DRILL N DPRB PROD1 POOH from 11250' laying in cement to 10150' 1.0/2000 @
70'/min
20:25-21:15 0.83 DRILL N DPRB PROD1 Park at 9400'. CircandWOC
21:15-21:25 0.17 DRILL N DPRB PROD1 RIH
21:25 - 21:35 0.17 DRILL N DPRB PROD1 Jet out cement from 10150-335' CTD.
21:35 - 23:30 1.92 DRILL N DPRB PROD1 POOH jetting to surface. Dump 30 bbls contam mud
23:30 - 00:00 0.50 DRILL N DPRB PROD1 OOH. LD cementing BHA
5/22/2001 00:00 - 02:00 2.00 DRILL N DPRB PROD1 Injector maintenance while WOC
02:00 - 03:00 1.00 DRILL N DPRB PROD1 MU building BHA (2.6 deg SR motor)
03:00-04:50 1.83 DRILL N DPRB PROD1 RIHw/BHA#13
04:50 - 05:20 0.50 DRILL N DPRB PROD1 Slite bobble thru window. Chk TF @ 40R. Log up from 10215'.
Comp str is 2000 psi
05:20 - 05:40 0.33 DRILL N DPRB PROD1 Add 13.0', RIH. No tag by 10353', TF @ 77L. Orient to right
05:40 - 06:15 0.58 DRILL N DPRB PROD1 RIH looking for cement. Tagged at 10530' 110R. Drill thru
shale looking for cement. Found top at 10540'. Drilled 5' to
10545'.
06:15 - 08:30 2.25 DRILL N DPRB PROD1 Circulate OOH. Noted some cement in btms up rtns. Cannot
determine how much, looks like 1-2 bbls, but very strung out.
08:30 - 09:00 0.50 DRILL N DPRB PROD1 LD kick off assy. MU cementing assy.
09:00 - 11:00 2.00 DRILL N DPRB PROD1 RIH. Add 12' at window. RIH Tag at 10560'. RU cementers &
spot Peak trucks.
11:00 - 11:15 0.25 DRILL N DPRB PROD1 Hold PJSM with Nordic, DS, Peak hands. Discuss pump
schedule & procedures & HSE issues.
11:15 - 12:00 0.75 DRILL N DPRB PROD1 Pump 4 bbls 2% kcl, 2 bbls fresh. PT test to 4000 psi. Ok.
Mix & pump 6 bbls Class G, 17# cement in tub. Pump 2 bbls
fresh. Displace with mud using rig pump. Displace with 60
bbls mud. 3 bpm@2750 psi.
12:00- 12:15 0.25 DRILL N DPRB PROD1 Layin6bblscmtl:l from 10530'. POOH to safety at 9800'.
CIP at 12:15.
12:15 - 13:15 1.00 DRILL N DPRB PROD1 Wait on cement to swap & settle.
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page lO of 12
Operations Summa Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/22/2001 13:15 - 13:50 0.58 DRILL N DPRB PROD1 Dress cement top to 10335'.
13:50 - 15:30 1.67 DRILL 'N DPRB PROD1 ~POOH, jetting to surface
15:30 - 15:50 0.33 DRILL N DPRB PROD1 Park at 2800' and conduct evacuation drill based on H2S
release, discuss
15:50 - 16:20 0.50' DRILL N DPRB PROD1 Resume POOH
16:20 - 16:50 0.50 DRILL N DPRB PROD1 LD cementing BHA
16:50 - 23:30 6.67 DRILL N DPRB PROD1 Weekly BOPE test while WOC. Witnessing waived by AOGCC
rep John Crisp.
23:30 - 00:00 0.50 DRILL N DPRB PROD1 PJSM Review plans and procedures for kickoff.
5/23/2001 00:00 - 00:30 0.50 DRILL N DPRB PROD1 P/U build section BHA #14 (2.6 SR motor 64.17')
00:30 - 02:30 2.00 DRILL N DPRB PROD1 TIH. Shallow test tools. Stop at 10100' make preliminary
correction of +12. Went through window at 120R TF at rain rate
without problem (small bobble). TIH to 10220'.
02:30 - 02:45 0.25 DRILL N DPRB PROD1 Log tie-in at 10179'. No correction.
02:45 - 04:00 1.25 DRILL N DPRB PROD1 TIH. Tagged hard cement at 10350'. Orient TF to 80R. Begin
time drilling kick-off. 2.4~2.4 bpm 42-4400 psi. to 10354.
04:00 - 06:15 2.25 DRILL N DPRB PROD1 Drill build section to 10450' 2.5/3560/6oR
06:15 - 08:00 1.75 DRILL N DPRB PROD1 Start new mud at 10450' 2.5/3860/65R. Drill to 10503'
08:00 - 08:50 0.83 DRILL N 'DPRB PROD1 Orient one click. Had to go to window
08:50 - 10:50 2.00 DRILL N DPRB PROD1 Drill ahead and land at 10590' (8839' 'I'VD). Continue right turn
and drill to 10650'
10:50 - 11:30 0.67 DRILL N DPRB PROD1 Wiper to window before POOH. Got bit stuck at 10500'. Pull
free. RIIH to TD. POOH, clean to window with two blue lite
specials
11:30 - 13:00 1.50 DRILL N DPRB PROD1 POOH for lateral assy
13:00- 14:00 1.00 DRILL N DPRB PROD1 LD build assy. MU lateral assy
14:00 - 15:40 1.67 DRILL N DPRB PROD1 RIH w/BHA #15 (1.3 deg motor)
15:40 - 15:50 0.17 DRILL N DPRB PROD1 RIH clean thru window. Add 12.0'. Log tie-in from 10210'-no
corr. 2.5/3500/21R
15:50- 16:00 0.17 DRILL N DPRB PROD1 Orient
16:00 - 16:15 0.25 DRILL N DPRB PROD1 RIH to tag at 10658'
16:15 - 16:30 0.25 DRILL N DPRB PROD1 Orient from 4R
16:30 - 18:00 1.50 DRILL N DPRB PROD1 Drill 60-120'/hr from 10658-800' 2.4/3450/80R
18:00 - 18:30 0.50 DRILL N DPRB PROD1 Wiperto window.
18:30 - 20:00 1.50 DRILL N DPRB PROD1 Drill 100-120'/hr f/10800'-10950' 2.4~2.4 3500 psi. Dropping
angle through anticipated shale section.
20:00 - 20:25 0.42 DRILL N DPRB PROD1 Wiper trip to window. Held FIRE drill with night crews.
20:25 - 00:00 3.58 DRILL N DPRB PROD1 Drill 100-120'/hr f/10950'- 11090' 2.4~2.4 3500 psi.
5/24/2001 00:00- 00:15 0.25 DRILL N DPRB PROD1 Drill lateral 11090' to 11100'.
,00:15 - 00:40 0.42 DRILL N DPRB PROD1 Wiper trip to window. No problems at kick-off.
'00:40 - 00:50 0.17 DRILL N DPRB PROD1 Log tie-in +3' correction
00:50 - 01:20 0.50 DRILL N DPRB PROD1 Wiper trip in hole.
01:20 - 03:00 1.67 DRILL N DPRB PROD1 Drill lateral f/11100' - 11250'. Leveling off back into target
sand.
03:00 - 04:10 1.17 DRILL N DPRB PROD1 Wiper trip in hole.
04:10 - 06:40 2.50 DRILL N DPRB PROD1 Drill lateral f/11250-369' 80-100'/hr 2.3/2.3 3720 psi on
bottom.
06:40 - 07:00 0.33 DRILL N DPRB PROD1 Wiper to 10950'-a few minor overpulls thru shale 10970-11080'
07:00 - 08:00 1.00 DRILL N DPRB PROD1 Drilling 11369-403' in a shale dropping from 8892-96' TV'D to
stay in (find again) the 14P
08:00 - 08:30 0.50 DRILL N DPRB PROD1 Wiper to window, clean
08:30 - 08:45 0.25 DRILL N DPRB PROD1 Tie-in, add 6.0'
08:45 - 09:30 0.75 DRILL N DPRB PROD1 RIH
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 11 of 12
Operations Summary Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC I Rig Number:
Date From -To Hours ~Activity Code NPT Phase Description of Operations
5/24/2001 09:30 - 10:00 0.50 DRILL N DPRB PROD1 Drill from 11403-414' in shale and MWD started cycling on and
off. Work with it a bit-nope
10:00 - 10:30 0.50 DRILL N DFAL PROD1 Wiper to window
10:30- 12:05 1.58 DRILL N DFAL PROD1 POOH for MWD
12:05 - 13:35 1.50 DRILL N DF^L PROD1 Change out MWD. Change motor bend to 1.1 deg, equalizer
jet to 15
13:35 - 16:00 2.42 DRILL N DFAL PROD1 RIH w/BHA #16. Add 12.0' at window. RIH and set down at
11020', 11077' and 11398'. RIH to TD at 11417' CTD
2.5/3450/121 L
16:00- 16:15 0.25 DRILL N DPRB PROD1 Wiperto 11350'
16:15- 17:30 1.25 DRILL N DPRB PROD1 VVork to drill thru shale from 11417-430'2.4/3300/55L
17:30 - 18:00 0.50 DRILL N DPRB PROD1 Drilling 50-80'/hr 2.5/3450/80L from 11430-471'
18:00 - 20:30 2.50 DRILL N DPRB PROD1 Orient to right. Back into sand at 11470'. 2.5/3850/72R. Into
shale again 11520'. Orient straight up. Drill sand to 11602'.
20:30 - 20:55 0.42 DRILL N DPRB PROD1 Wiper trip up overpulls through shale 11100-10970'.
20:55 - 21:15 0.33 DRILL N DPRB PROD1 Log tie-in +5' correction
21:15 -22:00 0.75 DRILL N DPRB PROD1 Wiper trip in hole. Setdown at 11000' orient from 120L to 15L
went through okay.
22:00 - 23:45 1.75 DRILL N DPRB PROD1 Drilling ahead in sand @ 11602'. 120'/hr 2.4/4000/91R to
11683. Orient around to 60R. Drill to 11730'. Stacking weight.
Ordered new mud.
23:45 - 00:00 0.25 DRILL N DPRB PROD1 Wiper trip.
5/25/2001 00:00 - 01:45 1.75 DRILL N DPRB PROD1 Finish wiper trip. Overpull working through shales 11100' -
10990'.
01:45 - 02:20 0.58 DRILL N DPRB PROD1 Drill ahead f/11730' trying to hold 60-70R TF. Drill to 11768'.
P/U 11707' to orient unable to go down. Pick-up stuck at
11707'.
:02:20 - 02:45 0.42 DRILL N STUC PROD1 Work stick pipe for 5 min, shutdown pumps with neutral weight.
Wait 20 min. Pick-up came free. Work pipe and circulate.
02:45 - 05:45 3.00 DRILL N DPRB PROD1 Return to bottom no problems. Resume drilling 11768'. (mud
finished at plant in route soon) Drilled to 11808'. Having trouble
orienting. Make short wiper trip. Drill ahead 2.4/3900/70-80TF.
(0415 swapping mud) 2.4/3750/80-90R TF. Drilled to 11900'.
05:45 - 06:45 1.00 DRILL N DPRB PROD1 Wiper trip to window.
06:45- 07:00 0.25 DRILL N DPRB PROD1 Tie-in, add 17.0'
07:00 - 08:00 1.00 DRILL N DPRB PROD1 RIH w/minor wt losses thru 11000' shale area
08:00 - 08:15 0.25 DRILL N DPRB PROD1 Tag at 11915' corr TD. Orient to left
08:15 - 10:00 1.75 DRILL N DPRB PROD1 Drilling from 11915-978' 2.3/3000/77L. Acts like a shale and
can't make hole from 11978'
10:00- 10:15 0.25 DRILL N DFAL PROD1 Wiperto 11750'
10:15 - 10:35 0.33 DRILL N DFAL PROD1 Attempt to make hole and no progress. Getting only 200 psi
diff, small chunks of rubber on shakers, motor?
10:35 - 11:30 0.92 DRILL N DFAL PROD1 Wiper to window
11:30 - 13:00 1.50 DRILL N DFAL PROD1 POOH for motor. Kick while trip drill. Pit drill
13:00 - 13:45 0.75 DRILL N DFAL PROD1 ,Change motor (rather rite, but nothing obvious, will have shop
' check this pm)
13:45 - 15:50 2.08 DRILL N DFAL PROD1 RIH w/BHA #17 (1.0 deg motor)
15:50 - 16:45 0.92 DRILL N DFAL PROD1 ~Add 12.0' at 10000'. RIH thru window. Wiper to TD-clean.
BHI motor was toast
16:45 - 17:00 0.25 DRILL N DFAL PROD1 Tag at 11978' CTD. Orient
17:00 - 19:30 2.50 DRILL N DPRB PROD1 Drilling 2.6/3100/83L in and out of 40-60 APl sand at 8898'
TVD trying to hold incl at 89 deg. Hard to hold NE quad TF.
19:30 - 20:00 0.50 DRILL N DPRB PROD1 Short wiper and orienting to 70-80L TF
Printed: 5/29/2001 1:35:32 PM
BP EXPLORATION Page 12 of 12
Operations Summa Report
Legal Well Name: G-25
Common Well Name: G-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
'Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/25/2001 20:00 - 20:15 0.25 DRILL N DPRB PROD1 Drilling 80-90L TF to 12150'.
20:15 - 21:00 0.75 DRILL N DPRB PROD1 Make scheduled wiper trip.
21:00 - 21:15 0.25 DRILL N DPRB PROD1 Log tie-in +5' correction.
21:15 - 22:00 0.75 DRILL N DPRB PROD1 TIH
22:00 - 00:00 2.00 DRILL N DPRB PROD1 Drilled f/12150' to 12273'.
5/26/2001 00:00 - 01:00 1.00 DRILL N DPRB PROD1 Continue drilling lateral f/12273' to 12322'.
01:00 - 02:50 1.83 DRILL N DPRB PROD1 Wiper trip. Set down at 10985' pick-up 1 time and work through
okay.
02:50 - 04:45 1.92 DRILL :N DPRB PROD1 Drill f/12323' 2.5/3650 60-80R TF to 12385' TD
04:45 - 07:30 2.75 DRILL P PROD1 Wiper trip and tie-in +11' correction. RIH and tag at corrected
TD of 12391'
07:30 - 08:45 1.25 DRILL P PROD1 POOH thru open hole, clean
08:45 - 10:15 1.50 DRILL P PROD1 POOH for liner
10:15- 11:00 0.75 DRILL P PROD1 LD drilling BHA
11:00 - 11:30 0.50 CASE P COMP RU to run liner
11:30 - 11:50 0.33 CASE P COMP Safety mtg re: liner
11:50 - 16:50 5.00 CASE P COMP Run 67 jts 2-7/8" 6.16# L-80 STL tubing w/float equipment.
Run 27 jts 3-3/16" 6.2# L-80 TCl 1 tubing
16:50- 18:00 1.17 CASE P COMP MU Baker CTLRT. Install Baker CTC. PT @ 35K, 3500 psi
18:00 - 20:10 2.17 CASE P COMP RIH w/liner on CT pump rain/rate. Stop at window up wt.
41k/lb, dw ,,vt 19k/lb. TIH (no problems at KO point, nothing at
11000', setdown at 11602' pickup 1 time work through okay.
Tagged bottom 12384' with correction of +7' that should be
bottom at 12391'. Pick-up wt 47k/#. Top of liner 9382'.
20:10 - 20:55 0.75 CASE P COMP Drop .625" bumped at 46 bbl in pressure up to 4200 psi and
sheared. Pick-up wt 29k/# liner released. Setdown with 5k/#
20:55 - 22:30 1.58 CASE P COMP Swapping to KCL and displace hole 3.1/3500 psi. R/U Dowell
cementers.
22:30 - 22:45 0.25 CASE P COMP PJSM: Cementing
22:45 - 00:00 1.25 CASE P COMP Batch mix 26 bbls pumpable 15.8 ppg cement. Pump 5 bbls
KCL ahead, PT lines to 4000 psi, pump 26 bbl cement, load CT
wiper dart, pump 2 bbl KCL behind, check dart/gone, pump
59.5 bbl total behind and bump LWP shear at 2650 psi, pump
17.7 bbls bump plug w/1100 psi over.. Checks held. ClP 00:10
Printed: 5/29/2001 1:35:32 PM
07/23/01 11:12 FAX 907 564 5193 BP EXPI, ORATION [~002
.. ;." .' ~!!~',,'--::":!!!ii~i:i:;~i~'i'!;'~;:';?i!~'''': BP ~'XI~LORATION Page 12 o:
· '.~-'.-1.-:-. :T'~Y-,~',.-. :.:-':. ':'::~2-:., ':c.:. ' · ,
........
._...~ . :=.. -;.-::.. ....... :'.? :~ .. :.. .
Legal Well Name: G-25
Common Well Name: O-25a Spud Date: 10/1/1986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End: 5t29/2001
~Contractor Name: NORDIC CALISTA Rig Release: 512912001
Rig Name: NORDIC 1 Rig Number:
~'"~::":'~ :¢~-~:~;::-~'"':k.?~-'-~;,_?~::~{~:?i:~g;:~:,:.:~'?:,-'.5.~?.;".~;~;.: =~=-k.;/,,,~::. ·:~-.~ ...... ~:~.-7,-,: ~ -~.'..:~;'5 ~ :~ ..-=?;~:-..~-=~::: .,:~;A,-~.?.:.:'....'.; ~'??,::;:yv.~.5· "~,.-~:~..,.:-%::,:. ~:%','s,~:4'.-..
,
~.-.'!:?.:'-.::~D--':'::~):'::':' .:;,-'.:'.'~ .':-7..,/.-..:~..:.~'~ ::~F, '~' :'1:~':.~"~;~:.:'.':::'.~:'.:.':?.:.~".- .'-":,:},-',- ..:'.*.- '=~: :z--,?...~:. ~':,:i ':.~:e:": ',':.~'-.':?.:, -~".'--. :'::'~.. :,:;':. '<:.'.. '.,:':. :'."'=-'-
512512001 20:00 - 20:15 0,25 DRILL N DPRB PROD1 Drilling 80-90L TF to 12150'.
20:15 - 21:00 0.75 DRILL N DPRB PROD1 Make scheduled wiper flip.
21:00- 21:15 0.25 DRILL N DPRB PROD1 Log tie-in +5' correction.
21:15-22:00 0,75 DRILL N DPRB PROD1 TIH
22:00 - 00:00 2.00 DRILL N DPRB PROD1 Drilled f/12150' to 12273',
512612001 00:00- 0'1:00 1.00 DRILL N DPRB PROD1 Continue drilling lateral f/12273' to 12:322'.
01:00 - 02:50 1,83 DRILL N DPRB PROD1 Wiper trip. Set down at 10985' pick-up 1 time and work through
okay,
02:50 - 04:45 1.92 DRILL N DPRB PROD1 Drill f/1232:3' 2.513650 60-80R TF to 12365' TD
04:45 - 07:30 2.75 DRILL P PROD1 Wiper trip and tie-in +11' correction, RIH and tag at corrected
TD of 12391'
07:30 - 08:45 1.25 DRILL P PROD1 POOH thru open hole, clean
08:45 - 10:15 1.50 DRILL P PROD1 POOH for liner
10:15- 11:00 0.15 DRILL P PROD1 LDdrllllng BHA
11:00 - 11:30 0,50 CASE P COMP Rtl to ru~ liner
11:30 - 11:50 0.33' CASE P COMP Safely mtg re: finer
11:50 - 16:50 5.00 CASE P COMP Run 67 its 2-7/8" 6.16# L-80 STL tubing w/float equipment.
Run 27 its 3-3/16" 6.2# L-80 TO11 tubing
16:50 - 18:00 1.17 CASE P COMP MU Baker CTLRT. 'Install Baker CTC. PT@ 35K, 3500 psi
18:00.20:10 2.17 CASE P COMP RIH w/line, r on CT pump man/rate. Stop at window up wt.
41k/lb, dw wt 191dlb. TrH (no problems at KO point, nothing at
t1000', setdown at 11602' pickup 1 time work through okay.
Tagged bottom 12384' with correction of +?' that should be
bottom at 12391'. Pick-up wt 47k/~, Top of liner 9382',
20:10 - 20:55 0.75 CASE !P COMP , Drop .625" bumped at 46 bbl in pressure up to 4200 psi and
P sheared. Pick-up wt 29k/~ liner released. 8etdown with 51d~
20:55 - 22:$0 ~.58 CASE COMP Swapping to KOL and displace hole 3,1/3500 psi. R/U Dowell
cementers.
22:30 - 22:45 0,25 CASE = COMP PJSM: Cementing
22:45 - 00:00 1.25 CASE ~ COMP Batch mix 26 bbls pumpable 15.8 ppg cement. Pump 5 bbls
KOL ahead, PT Ilne~ to 4000 psi, pump 26 bbl cement, Icad CT
wiper dart, pump 2 bbl KOL behind, check dart/gone, pump
59.5 bbl total behind and bump LWP shear at 2650 psi, pump
17,7 bbls bump plug w/1100 psi over.. Oheok~ held. OlP 00:10
5/27/2001 00:00 - 02:00 2.00 CASE :~ OOMP Finish cementing liner. 61P @ 00:10 hrs. Wash-up on top of
liner. Pumping 2,9 bpm and TOH. No cement seen at surface.
02:00 - 04:15 2,25 CASE !P COMP P/U Baker 2-1t8" motor and 2,3" mill w/96 its I 114" OSH (in
derrick). (BHA 3013.87')
04:15 - 05:15 1,00 CASE ~ COMP TIH to 9362'.
05:15.06:15 1.00 CASE P COMP WOO before ¢leanout
06:15 - 07:30 1.25 CASE :P OOM~ Omt @ 200 psi. RIH in liner and CO to tag at 12300' OTB
little high). Attempt to drill, but acts like wiper
07:$0-09:15 1,75 CASE ~P COMP POOH. Cmt~llSOpsi. No cement to surface
09:15 - 11:45 2.50 CASE P COMP Standback CSH workstring
11:45.12:00 0.25 EVAL :~ COMP Safety mtg re: source
12:00 - 12:45 0.75 EVAL ~ COMP MU SWS GPJCNL tool wi carrier
12:45 - 14:15 1.50 EVAL ~ COMP MU 48 stds CSH workstring
14:15- 15:30 1.25 EVAL ~ COMP RIHw/C'I'
15:30.17:25 1.92 EVAL P COMP Begin logging down at 30'/man
17:25 - 20:10 2.75 EVAL P COMP Tag at 12301' CTD, POOH logging at 30'/min and laying in 17
'bbla fresh 150K FIo Pro mud
20:10 - 20:45 0.58 EVAL P COMP :PJSM: Handling source and I 114" CSH,
20:45 - 22:00 1.25 EVAL P :COMP Standback 48 stds I 1/4" CSH.
Prlntec~: 7t23/2001 1'.00:09 PM
07/23/01. 11:1.3 FAX 907 564 51.93 BP EXI'I~ORATION [~003
,,
· '/.:.?~:':"5:'::.:. ~'.-'-~?.: :-~:,~-:.'.' ,-.:~._ ":, ~:-'.-z.-'::: '....:~;..-?.~ :'.~ :~ :." ,~,--~.,.':',.-..:.? .. ' ,
i:~:~:~.~!?~i~:~?~}~ii?~!~!:;.~i~!?~J..~i?i!~:~L.:~¢~}~.!~ BP EXPLORATION' Page 13 of :3
.- :,~ .-.":¥- .~!?. ',-;~,-.: ,::-~. :-=. ; :-: .:. 7~., .~.'::_; ~ &._.. .
i } i} '-' per.
Legal Well Name: G-25
Common Well Name: G-250 Spud Date: 10/111986
Event Name: REENTER+COMPLETE Start: 5/9/2001 End: 5129/2001
Contractor Name: NORDIC CALISTA Rig Release: 5/29/2001
Rig Name: NORDIC 1 Rig Number.
i~,F':~'~: ~'?~!'?.'~*'=''~;-'''''~-'' ' .~ ~:-~'-~::,;-~"=.-~.".. :" ,~:.~)~--~-'""-'~ ~ .'.-~" '~;-~.~.~.~ .,'".~i."--'-~ ~.' ,~ ..., ,,, ..... ~' ~::f:~,:'.,~~..~.~~;~'`~:~`"~`¥:~-:~!:~`5~-`--~`:¥:`:5~:~`¥~e``.~:~``~?£~`~``.~`~:~--~`>~£~L~:~?`~]~;:' :L-.'~-,~. ,?-'~--.,~.:
................. I :~;~?.~..,1 .~;:.-':.".., :.'..~',. .?,~, ,:?,: ', .','~2 , ':~-,~".'~.-' :,:~::'£~.... '~:~::,~, -.;-'.:.'--..:;:" ':,.-:?.~ ":.%:.~' ...:
512712001 22:00- 22:15 0.25 EVAL P COMP L/D logging tools.
22:15 - 23:00 0.75 EVAL ~ COMP R/U and PT liner top. Starting pressure 2000 psi for 30 min,
final 1550 psi.
23:00 - 23:30 0.50 EVAL ~ COMP PJSM: PIU perfguns
23:30.00:00 0.50 EVAL ~ COMP Make-up SWS 2" Powerjet 4SPF perf guns.
512812001 00:00 - 03:15 3.25 PERF P COMP Finish p/u of 2" SWS PowerJet guns and 1 114" CSH tubing
BHA.
03:15 - 05:45 2,50 PERF P COMP TIH 7460'. Pump in 4 bbls FIo-Pro. On depth 12320'.
05:45 - 08:30 0,7~ PERF P COMP Drop ,625" ball and displace wl KCI water to seat. Sheared at
3100 psi.' No fluid or WHP loss
Perforated 11440-~30', 11590-7g0', 11840-12080' and
12180-320' w/4spf
06:30.08:45 2.25 PERF P COMP POOH wl perf guns filling from BS
08:45- 10:45 2.00 PERF P COMP , Standback CSHworkstring
10:48 - 11:00 0.25 PERt~ P COMP Safety mtg re: peff guns
11:00 - 15:15 4.25 PERF P COMP LD 4:2 perf guns and blanks-all shots fired. Load out same
15:15 - t5:30 0.25 RIGD P COMP Safety mtg re: workstrlng
15:30 - 16:50 1,33 RIGD P COMP RIH w/48 stds CSH workstring
16:50 - 17:50 1.00 RIGD' P ICOMP ' POOH LD CSH singles
17:50 - 18:10 0.33 RIGD P COMP iSafety rotc/crew change
18:10- 19:50 1.67 RIGD P COMP 'POOH LDDP
19:50 - 22:30 2.671 RIGD P COMP IStab-on injector. RIH w/CT to 2000', Lay-in methanol 1:1.
22:30 - 00:00 1.50 RIGD P COMP Shut-In master valve, Start P/D,
512912001 !00:00 - 03:30 3.50 RIGD P COMP Continue R/D.
03:30 - 0.00 RIGD P COMP Rig released at 03:30 hrs. 5-29-2001 Move to X-22A
. I ,,
Printed: 7/23/2001 1:00:09 PM
2 ~l-
14-dun-01
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well G-25A
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,342.21' MD
Window / Kickoff Survey: 10,350.00' MD
Projected Survey: 12,391.00' MD
(if applicable
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
JUN 1 4 2001
Alaska 0il & G~s 0OHS.
Anchorage
DEFINITIVE
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA G Pad, Slot G-25
G-25A
Job No. AKMW10156, Surveyed: 26 May, 2001
S UR VEY REPORT
June, 2001
Your Reft API-500292165201
Surface Coordinates: 5969032.00 N, 658254.00 E (70° 19' 19.4341" N, 148° 43' 00.6988" W)
Kelly Bushing: 72.40ft above Mean Sea Level
DRILLING 5ERVIC_e5
Survey Reft svy10838
A Halliburton Company
Sperry-Sun Drilling Services
Survey Report for G-25A
Your Ref: API-500292165201
-Job No. AKMWI0156, Surveyed: 26 May, 2001
North Slope Alaska
Measured
Depth
(ft)
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
10342.21 60.200 178.730 8770.98 8843.38
10350.00 60.540 181.650 8774.83 8847.23
10384.28 62.670 194.190 8791.19 8863.59
10415.88 64.340 206.680 8805.33 8877.73
10477.28 77.480 225.780 8825.53 8897.93
10519.48 83.410 242.010 8832.58 8904.98
10554.68 85.250 256.600 8836.08 8908.48
10593.28 87.800 269.250 8838.42 8910.82
10624.68 86.750 280.500 8839.92 8912.32
10656.63 86.480 288.410 8841.81 8914.21
10688.03. 90.090 291.400 8842.75 8915.15
10739.03 87.980 298.960 8843.61 8916.01
10776.03 88.860 304.590 8844.63 8917.03
10818.83 88.590 311.620 8845.59 8917.99
10863.03 89.650 318.650 8846.27 8918.67
10897.23 84.550 321.110 8848.00 8920.40
10926.23 80.160 323.040 8851.85 8924.25
10954.03 75.850 322.870 8857.63 8930.03
10978.03 73.480 323.750 8863.98 8936.38
11009.03 78.050 323.920 8871.60 8944.00
11042.43 84.900 324.980 8876.55 8948.95
11072.83 83.320 319.880 8879.67 8952.07
11102.63 80,860 317.940 8883.77 8956.17
11137.03 82.700 314.250 8888.69 8961.09
11175.63 86.840 310.560 8892.21 8964.61
11221.43 87.450 309.510 8894.49 8966.89
11257.03 92.020 306.520 8894.65 8967.05
11288.23 91.670 303.530 8893.65 8966.05
11312.03 93.080 301.070 8892.66 8965.06
11350.23 91.760 295.620 8891.05 8963.45
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
216.12 S 4712.43 E 5968915.30 N 662969.94 E
222.89 S 4712.41 E 5968908.53 N 662970.06 E
252.66 S 4708.24 E 5968878.67 N 662966.52 E
279.08 S 4698.37 E 5968852.05 N 662957.21 E
325.29 S 4664.03 E 5968805.13 N 662923.85 E
349.68 S 4630.51 E 5968780.04 N 662890.86 E
362.01S 4597.83 E 5968767.02 N 662858.45 E
366.74 S 4559.68 E 5968761.48 N 662820.40 E
364.08 S 4528.48 E 5968763.49 N 662789.15 E
356.13 S 4497.62 E 5968770.79 N 662758.13 E
345.44 S 4468.12 E 5968780.85 N 662728.41E
323.77 S 4422.00 E 5968801.55 N 662681.85 E
304.30 S 4390.58 E 5968820.35 N 662650.02 E
277.91S 4356.93 E 5968846.02 N 662615.82 E
246.61S 4325.77 E 5968876.66 N 662584.01E
220.50 S 4303.77 E 5968902.30 N 662561.46 E
197.83 S 4286.10 E 5968924.59 N 662543.32 E
176.13 S 4269.73 E 5968945.94 N 662526.49 E
157.58 S 4255.90 E 5968964.20 N 662512.27 E
133.32 S 4238.17 E 5968988.07 N 662494.04 E
106.46 S 4218.98 E 5969014.52 N 662474.29 E
82.50 S 4200.55 E 5969038.09 N 662455.36 E
60.26 S 4181.16 E 5969059.92 N 662435.50 E
35.74 S 4157.55 E 5969083.94 N 662411.38 E
9.83 S 4129.17 E 5969109.24 N 662382.46 E
19.60 N 4094.15 E 5969137.92 N 662346.83 E
41.51N 4066.11E 5969159.24 N 662318.33 E
59.41 N 4040.58 E 5969176.59 N 662292.43 E
72.11 N 4020.48 E 5969188.87 N 662272.07 E
90.23 N 3986.91E 5969206.27 N 662238.12 E
Dogleg
Rate
(°/100ft)
Alaska Drilling & Wells
PBU WOA G Pad
Vertical
Section Comment
-3984.16 Tie on point
32.872 -3988.02 OHST
32.757 -4001.68
35.751 -4008.75
36.278 -4007.13
40.425
41.573
33.369
35.943
24.729
14.924
15.387
15.395
16.433
16.083
16.551
16.512
15.515
10.489
14.752
20.747
17.478
10.475
il.887
14.339
2.649
15.339
9.644
11.906
14.667
-3993.66
-3973.97
-3945.43
-3918.34
-3888.50
-3858.21
-3808.00
-3771.09
-3728.39
-3684.91
-3651.91
-3624.44
-3598.58
-3576.61
-3548.18
-3517.05
-3488.21
-3459.57
-3426.16
-3388.06
-3342.49
-3306.96
-3275.78
-3252.02
-3214.13
10 June, 2001 - 3:34 Page 2 of 4 DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for G-25A
Your Ref: API-500292165201
Job No. AKMW10156, Surveyed: 26 May, 2001
North Slope Alaska
Measured
Depth
(ft)
Azim.
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
11399.03 85.960 293.160 8892.02 8964.42
11432,88 84,810 291.230 8894.74 8967.14
11477.68 84.200 285.950 8899.03 8971.43
11516.88 86.040 290.870 8902.37 8974.77
11556.68 86,570 295,970 8904.94 8977.34
11589.68 89.910 297.030 8905.95 8978.35
11631.08 91.140 302,120 8905.57 8977.97
11675.68 88.680 306.170 8905.64 8978.04
11705.48 89.300 311.090 8906.17 8978.57
11742.08 89,300 316.710 8906.61 8979.01
11759.68. 89.120 318.470 8906.86 8979.26
11790.08 91,140 321.990 8906.79 8979.19
11822.08 91.670 324.270 8906.00 8978.40
11856.28 92.370 329.020 8904.80 8977.20
11914.98 92.990 330,780 8902.05 8974.45
11947.98 91.850 329.020 8900.66 8973.06
11977.04 91.670 325.150 8899.77 8972.17
12013.04 91.670 321.110 8898.72 8971.12
12043.24 92.550 318.300 8897.60 8970.00
12072.64 92.460 315.660 8896.32 8968.72
12100.64 92.900 312.320 8895.01' 8967.41
12132.84 92,020 312.320 8893.63 8966.03
12165.44 93,600 310.390 8892.03 8964.43
12213.84 95.980 308.450 8887.99 8960.39
12251.44 94.390 311.790 8884.59 8956.99
12285.84 92,550 316.360 8882.51 8954.91
12347.04 93.340 322.690 8879.36 8951.76
12363.04 94.310 325.500 8878.29 8950.69
12391,00 94.310 325.500 8876.19 8948.59
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
110.36 N 3942.49 E 5969225.47 N 662193.29 E
123.11 N 3911.25 E 5969237.55 N 662161.79 E
137.32 N 3869.00 E 5969250.87 N 662119.25 E
149.65 N 3831.96 E 5969262.42 N 662081.95 E
165.44 N 3795.52 E 5969277.43 N 662045.19 E
180.15 N 3766.01E 5969291.52 N 662015.37 E
200.58 N 3730.02 E 5969311.18 N 661978.96 E
225.60 N 3693.12 E 5969335.43 N 661941.54 E
244.20 N 3669.85 E 5969353.53 N 661917.88 E
269.56 N 3643.49 E 5969378.33 N 661891.00 E
282.56 N 3631.62 E 5969391.07 N 661878.86 E
305.92 N 3612.18 E 5969414.02 N 661858.92 E
331.51 N 3592.98 E 5969439.20 N 661839.20 E
360.05 N 3574.20 E 5969467.33 N 661819.81E
410.78 N 3544.79 E 5969517.43 N 661789.34 E
439.30 N 3528.26 E 5969545.60 N 661772.21E
463.68 N 3512.48 E 5969569.64 N 661755.92 E
492.46 N 3490.89 E 5969597.96 N 661733.73 E
515.48 N 3471.38 E 5969620.56 N 661713.73 E
536.95 N 3451.34 E 5969641.60 N 661693.25 E
556.37 N 3431.22 E 5969660.60 N 661672.72 E
578.03 N 3407.43 E 5969681.75 N 661648.49 E
599.54 N 3382.99 E 5969702.74 N 661623.60 E
630.17 N 3345.74 E 5969732.57 N 661585.71E
654.29 N 3317.11E 596975.6.09 N 661556.58 E
678.17 N 3292.45 E 5969779.45 N 661531.42 E
724.64 N 3252.80 E 5969825.07 N 661490.79 E
737.57 N 3243.44 E 5969837.80 N 661481.16 E
760.55 N 3227.64 E 5969860.43 N 661464.89 E
Dogleg
Rate
(°/100ft)
12,909
6.621
11.810
13.357
12.857
10.618
12.648
10.624
16,638
15.354
10.051
13,350
7.313
14.030
3.176
6.350
13,325
11.217
9.744
8.976
12.019
2,733
7,645
6.335
9.805
14,298
10,410
18.542
0.000
Alaska Drilling & Wells
PBU WOA G Pad
Vertical
Section Comment
-3166.20
-3133.30
-3090.54
-3053.12
-3014.22
-2981.61
-2940.41
-2895.82
-2866.10
-2829.96
-2812.78
-2783.46
-2753.06
-2721.30
-2668.11
-2638.21
-2611.30
-2577.11
-2547.92
-2519.19
-2491.57
-2459.66
-2427.30
-2379.22
-2341.93
-2308.03
-2248.90
-2233.81
-2207.70
Projected Survey
June, 2001 - 3:34 Page 3 of 4 DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for G.25A
Your Ref: API-50029216520~
Job No. AKMWfOf56, Surveyed: 26 May, 200f
North Slope Alaska
Alaska Drilling & Wells
PBU WOA G Pad
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 26.675° (10-May-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well Reference and calculated along an Azimuth of 305.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12391.00ft.,
The Bottom Hole Displacement is 3316.04ft., in the Direction of 76.741° (True).
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
Comment
10342.21 8843.38 216.12 S 4712.43 E Tie on point
10350.00 8847.23 222.89 S 4712.41 E OHST
12391.00 8948.59 760.55 N 3227.64 E Projected Survey
Survey tool program for G-25A
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (fi)
0.00 0.00 10100.00 8661.99
10100.00 8661.99 12391.00 8948.59
Survey Tool Description
AK-3 BP_HM - BP High Accuracy Magnetic (G-25)
MWD Magnetic (G-25APB1)
June, 2001 - 3:34 Page 4 of 4 DrillQuest 2.00.08.005
14-Jun-01
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well G-25APB2
Dear Dear SidMadam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,570.81' MD
Window / Kickoff Survey: 10,603.30' MD
Projected Survey: 12,434.00' MD
(if applicable
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
JUN 1 4 2001
Alaska Oil & Gas Cons.
Anchorage,
DEF N T V
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA G Pad, Slot G-25
G-25APB2
Job No. AKMW10156, Surveyed: 21 May, 2001
SURVEY REPORT
June, 200~
Your Ref: API-500292165271
Surface Coordinates: 5969032.00 N, 658254.00 E (70° 19' 19.4341" N, 148° 43' 00.6988" W)
Kelly Bushing: 72.40ft above Mean Sea Level
BRILLINI~ 5ERVI(:~E5
Survey Ref: svy10839
A Halliburton Company
Sperry-Sun Drilling Services
Survey Report for G-25APB2
Your Ref: API-5OO2g216527~
Job No. AKMWfO~56, Surveyed: 2~ May, 200~
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(fi)
Vertical
Depth
(ft)
10570.81 74.710 252.550 8862.69 8935.09
10603.30 73.780 261.630 8871.53 8943.93
10638.00 70.400 272.070 8882.23 8954.63
10664.80 71.100 280.680 8891.08 8963.48
10694.60 72.600 289.120 8900.38 8972.78
10728.60 77.780 298.080 8909.08 8981.48
10759.40 79.720 304.230 8915.09 8987.49
10787.40 83.670 311.620 8919.14 8991.54
10815.60 85.600 318.650 8921.78 8994.18
10846.06 87.540 326.560 8923.61 8996.01
10877.46 85.600 331.660 8925.49 8997.89
10912.86 87.630 325.500 8927.58 8999.98
.10943.46 87.430 321.120 8928.90 9001.30
10975.66 86.310 316.010 8930.66 9003.06
11005.26 85.870 311.970 8932.68 9005.08
11038.86 88.400 307.520 8934.36 9006.76
11069.06 88.940 302.300 8935.06 9007.46
11099.26 92.720 301.070 8934.62 9007.02
11128.26 90.180 295.440 8933.89 9006.29
11165.46 90.440 292.100 8933.69 9006.09
11195.86 91.670 287.010 8933.13
11230.86 91.320 281.380 8932.21
11259.66 92.200 276.990 8931.33
11294.66 94.220 280.500 8929.37
11332.46 94.920 287.360 8926.35
9005.53
9004.61
9003.73
9001.77
8998.75
11382.46 91.490 293.510 8923.55 8995.95
11418.06 92.280 297.910 8922.38 8994.78
11448.06 92.110 303.710 8921.23 8993.63
11482.66 89.910 308.630 8920.62 8993.02
11518.46 89.650 315.660 8920.76 8993.16
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
372.76 S 4595.94 E 5968756.24 N 662856.78 E
379.74 S 4565.50 E 5968748.61 N 662826.49 E
381.58 S 4532.59 E 5968746.08 N 662793.63 E
378.77 S 4507.48 E 5968748.36 N 662768.46 E
371.49 S 4480.14 E 5968755.06 N 662740.98 E
358.32 S 4450.08 E 5968767.59 N 662710.64 E
342.70 S 4424.24 E 5968782.67 N 662684.49 E
325.67 S 4402.42 E 5968799.23 N 662662.30 E
305.79 S 4382.62 E 5968818.69 N 662642.10 E
281.65 S 4364.18 E 5968842.44 N 662623.14 E
254.76 S 4348.09 E 5968868.98 N 662606.49 E
224.62 S 4329.68 E 5968898.72 N 662587.45 E
200.11 S 4311.41 E 5968922.84 N 662568.68 E
176.02 S 4290.14 E 5968946.48 N 662546.90 E
155.51S 4268.90 E 5968966.54 N 662525.23 E
134.06 S 4243.11E 5968987.44 N 662498.99 E
116.79 S 4218.36 E 5969004.18 N 662473.88 E
100.93 S 4192.67 E 5969019.50 N 662447.86 E
87.22 S 4167.14 E 5969032.67 N 662422.06 E
72.23 S 4133.10 E 5969046.94 N 662387.71 E
62.06 S 4104.47 E 5969056.51 N 662358.87 E
53.48 S 4070.57 E 5969064.36 N 662324.79 E
48.88 S 4042.16 E 5969068.36 N 662296.29 E
43.57 S 4007.62 E 5969072.94 N 662261.65 E
34.51S 3971.07 E 5969081.23 N 662224.92 E
17.09 S 3924.33 E 5969097.67 N 662177.81 E
1.66 S 3892.28 E 5969112.42 N 662145.44 E
13.69 N 3866.54 E 5969127.22 N 662119.39 E
34.10 N 3838.62 E 5969147.04 N 662091.05 E
58.11N 3812.10 E 5969170.48 N 662064.02 E
Dogleg
Rate
(°/100ft)
27.047
30.231
30.440
27.376
29.675
20.571
29.677
25.745
26.692
17.350
18.292
14.315
16.223
13.698
15.220
17.372
13.162
21.291
9.006
17.222
16.111
15.539
11.557
18.185
14.065
12.551
19.327
15.574
19.650
Alaska Drilling & Wells
PBU WOA G Pad
Vertical
Section Comment
-3978.58
-3957.65
-3931.75
-3909.56
-3882.99
-3850.81
-3820.69
-3793.05
-3765.43
-3736.47
-3707.87
-3675.50
-3646.48
-3615.24
-3586.08
-3552.65
-3522.47
-3492.33
-3463.55
-3427.07
-3397.78
-3365.09
-3339.18
-3307.85
-3272.71
-3224.42
-3189.31
-3159.43
-3124.85
-3089.36
Tie on point
MWD Magnetic
OHST
10 June, 2001 - 3:38 Page 2 of 4 DrillQuest 2.00.08.005
North Slope Alaska
Measured
Depth
(ft)
Incl.
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
11550.66 88.770 321.640 8921.20 8993.60
11580.26 89.300 327.090 8921.70 8994.10
11619.66 89.820 333.240 8922.01 8994.41
11659.86 90.440 342.130 8921.91 8994.31
11695.99 89.070 345.790 8922.07 8994.47
11734.19 92.250 350.380 8921.63 8994.03
11772.19 93.570 346.500 8919.70 8992.10
11811.99 91.450 341.740 8917.96 8990.36
11841.59 90.750 335.050 8917.39 8989.79
11869.79 93.130 333.280 8916.43 8988.83
11914.39. 94.800 326.940 8913.34 8985.74
11942.19 94.710 321.830 8911.04 8983.44
11972.99 92.160 315.840 8909.19 8981.59
12006.19 93.740 313.370 8907.48 8979.88
12039.89 95.240 308.610 8904.84 8977.24
12070.09 96.650 304.910 8901.71 8974.11
12104.89 94.890 301.560 8898.22 8970.62
12137.89 94.630 300.330 8895.48 8967.88
12170.29 91.370 296.810 8893.78 8966.18
12205.89 89.690 290.820 8893.45 8965.85
12237.89 90.400 286.060 8893.43 8965.83
12268.29 91.100 278.660 8893.03 8965.43
12295.29 92.860 277.070 8892.09 8964.49
12325.89 91.280 272.840 8890.99 8963.39
12359.69 90.040 277.600 8890.60 8963.00
12389.29 89.340 281.300 8890.76 8963.16
12434.00 89.340 281.300 8891.27 8963.67
Sperry-Sun Drilling Services
Survey Report for G-25APB2
Your Ref: API-500292165271
Job No. AKMWlO156, Surveyed: 2~ May, 200~
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
82.27 N 3790.83 E 5969194.18 N 662042.26 E
106.31 N 3773.60 E 5969217.86 N 662024.52 E
140.47 N 3754.01E 5969251.60 N 662004.21E
177.63 N 3738.76 E 5969288.42 N 661988.18 E
212.34 N 3728.78 E 5969322.92 N 661977.47 E
249.70 N 3720.89 E 5969360.10 N 661968.80 E
286.87 N 3713.29 E 5969397.11 N 661960.42 E
325.11N 3702.41E 5969435.10 N 661948.73 E
352.60 N 3691.52 E 5969462.37 N 661937.27 E
377.97 N 3679.24 E 5969487.47 N 661924.45 E
416.52 N 3657.08 E 5969525.54 N 661901.49 E
439.04 N 3640.96 E 5969547.71 N 661884.89 E
462.17 N 3620.73 E 5969570.41 N 661864.18 E
485.45 N 3597.12 E 5969593.19 N 661840.09 E
507.48 N 3571.77 E 5969614.68 N 661814.28 E
525.45 N 3547.72 E 5969632.15 N 661789.85 E
544.43 N 35~8.76 E 5969650.50 N 661760.50 E
561.34 N 3490.56 E 5969666.81 N 661731.94 E
576.80 N 3462.15 E 5969681.68 N 661703.21E
591.17 N 3429.60 E 5969695.36 N 661670.37 E
601.29 N 3399.25 E 5969704.83 N 661639.81E
607.79 N 3369.58 E 5969710.71N 661610.01E
611.48 N 3342.85 E 5969713.84 N 661583.21E
614.12 N 3312.39 E 5969715.83 N 661552.70 E
617.20 N 3278.74 E 5969718.20 N 661519.00 E
622.06 N 3249.55 E 5969722.44 N 661489.71E
630.82 N 3205.71E 5969730:27 N 661445.69 E
Dogleg
Rate
(°/100ft)
18.770
18.496
15.664
22.168
10.816
14.616
10.773
13.081
22.720
10.515
14.667
18.321
21.103
8.823
14.768
13.049
10.831
3.797
14.796
17.474
15.039
24.449
8.782
14.748
14.552
12.721
0.000
Alaska Drilling & Wells
PBU WOA G Pad
Vertical
Section Comment
-3058.08
-3030.17
-2994.53
-2960.73
-2932.64
-2904.75
-2877.20
-2846.37
-2821.67
-2797.O6
-2756.80
-273O.67
-2700.84
-2668.15
-2634.75
-2604.73
-2570.13
-2537.33
-2505.18
-2470.28
-2439.61
-2411.58
-2387.57
-2361.10
-2331.78
-2305.08
-2264.14
Projected Survey
~0 June, 200~ - 3:38 Page 3 of 4 DrillQuest 2.00.08.005
North Slope Alaska
Sperry-Sun Drilling Services
Survey Report for G-25APB2
Your Ref: API-500292~ 65271
Job No. AKMWlO156, Surveyed: 2~ May, 200~
Alaska Drilling & Wells
PBU WOA G Pad
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference
Magnetic Declination at Surface is 26.675° (10-May-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well Reference and calculated along an Azimuth of 305.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12434.00ft.,
The Bottom Hole Displacement is 3267.19ft., in the Direction of 78.868° (True).
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (fi)
Comment
10570.81 8935.09 372.76 S 4595.94 E Tie on point
10603.30 8943.93 379.74 S 4565.50 E OHST
12434.00 8963.67 630.82 N 3205.71 E Projected Survey
Survey tool program for G-25APB2
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
0.00 0.00 10570.81 8935.09
10570.81 8935.09 12434.00 8963.67
Survey Tool Description
AK-3 BP_HM - BP High Accuracy Magnetic (G-25)
MWD Magnetic (G-25APB2)
June, 2001 - 3:38 Page 4 of 4 DriilQuest 2.00.08.005
14-Jun-01
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well G-25APB1
Dear Dear SidMadam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,100.00' MD
Window / Kickoff Survey: 10,168.00' MD
Projected Survey: 11,452.00' MD
(if applicable
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
JUN 1 4 2001
AJag~ Oil & Ga~ Cons, Cofllmieetor
Anchorage
DEFiNiTiVE
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA G Pad, Slot G-25
G-25APBI
Job No. AKMWfOf56, Surveyed: ~5 May, 2001
$ UR VEY REPORT
June, 200~
Your Ref: API200292165270
Surface Coordinates: 5969032.00 N, 658254.00 E (70° 19' 19.434~" N, 148° 43' 00.6988" Vt/)
Kelly Bushing: 72.40ft above Mean Sea Level
BRILLINI3 EiERVII~E5
Survey Ref: svy10837
A Halliburton Company
Sperry-Sun Drilling Services
Survey Report for G.25APB1
Your Ref: AP!200292165270
Job No. AKMWlO156, Surveyed: ~5 May, 200~
r
North Slope Alaska
Measured
Depth
(ft)
Sub-Sea
Depth
(ft)
Vertical
Depth
(ft)
10100.00 28.620 107.310 8589.59 8661.99
10168.00 28.180 107.310 8649.41 8721.81
10203.27 35.420 124.500 8679.43 8751.83
10237.38 43.170 141.100 8705.88 8778.28
10272.41 48.440 158.210 8730.38 8802.78
10306.41 54.400 166.420 8751.60 8824.00
10342.21 60.200 178.730 8770.98 8843.38
10375.61 62.670 191.030 8787.00 8859.40
10409.21 63.190 201.930 8802.33 8874.73
10445.41 63.460 211.250 8818.61 8891.01
10488.61 68.030 226.710 8836.44 8908.84
10509.01 69.870 232.690 8843.77 8916.17
10539.21 72.070 241.480 8853.63 8926.03
10570.81 74.710 252.550 8862.69 8935.09
10601.81 76.820 262.750 8870.33 8942.73
10637.01 76.900 275.230 8878.37 8950.77
10670.21 76.990 284.550 8885.88 8958.28
10701.21 79.450 294.740 8892.23 8964.63
10731.01 86.750 300.190 8895.81 8968.21
10769.49 88.990 308.790 8897.24 8969.64
10800.09 89.870 316.900 8897.54 8969.94
10831.29 88.370 320.070 8898.02 8970.42
10865.49 85.900 322.010 8899.73 8972.13
10898.69 84.320 317.250 8902.56 8974.96
10934.89 85.900 312.140 8905.65 8978.05
10964.89 87.580 307.730 8907.36 8979.76
10998.69 89.070 303.860 8908.35 8980.75
11028.29 88.810 300.680 8908.89 8981.29
11058.89 87.140 297.860 8909.98 8982.38
11089.49 85.200 295.930 8912.02 8984.42
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft)
106.78 S 4625.38 E 5969022.77 N -662880.61 E
116.41S 4656.26 E 5969013.80 N 662911.68 E
124.70 S 4672.69 E 5969005.85 N 662928.28 E
139.44 S 4688.23 E 5968991.44 N 662944.13 E
161.04 S 4700.68 E 5968970.12 N 662957.03 E
186.33 S 4708.66 E 5968944.99 N 662965.54 E
216.12 S 4712.43 E 5968915.30 N 662969.94 E
245.26 S 4709.91E 5968886.11N 662968.03 E
273.88 S 4701.43 E 5968857.31 N 662960.16 E
302.76 S 4686.97 E 5968828.13 N 662946.32 E
333.19 S 4662.23 E 5968797.19 N 662922.22 E
345.49 S 4647.72 E 5968784.59 N 662907.97 E
360.97 S 4623.77 E 5968768.60 N 662884.36 E
372.76 S 4595.94 E 5968756.24 N 662856.78 E
379.16 S 4566.63 E 5968749.22 N 662827.61 E
379.76 S 4532.43 E 5968747.89 N 662793.43 E
374.21S 4500.61 E 5968752.77 N 662761.50 E
364.02 S 4472.07 E 5968762.36 N 662732.76 E
350.38 S 4445.86 E 5968775.45 N 662706.26 E
328.62 S 4414.20 E 5968796.53 N 662674.14 E
307.83 S 4391.78 E 5968816.84 N 662651.30 E
284.48 S 4371.11 E 5968839.76 N 662630.13 E
257.92 S 4349.63 E 5968865.85 N 662608.10 E
232.73 S 4328.21E 5968890.59 N 662586.16 E
207.37 S 4302.58 E 5968915.40 N 662560.00 E
188.15 S 4279.62 E 5968934.13 N 662536.64 E
168.39 S 4252.22 E 5968953.31 N 662508.83 E
152.59 S 4227.20 E 5968968.58 N 662483.48 E
137.64 S 4200.53 E 5968982.96 N 662456.50 E
123.83 S 4173.30 E 5968996.19 N 662428.99 E
Dogleg
Rate
(°/100ft)
0.647
32.706
38.134
38.012
25.738
33.124
33.160
28.919
23.013
34.271
28.803
28.458
34.586
32.607
34.523
27.347
33.138
3O.484
23.O79
26.657
11.239
9.179
15.057
14.726
15.708
12.264
10.777
10.705
8.933
Alaska Drilling & Wells
PBU WOA G Pad
Vertical
Section Comment
-3850.14
-3880.95
-3899.17
-3920.36
-3942.94
-3963.98
-3984.16
-3998.81
-4008.28
-4013.00
-4010.19
-4OO5.35
-3994.62
-3978.58
-3958.24
-3930.57
-3901.32
-3872.10
-3842.80
-3804.39
-3774.10
-3743.77
-3710.95
-3678.95
-3643.41
-3613.58
-3579.80
-3550.25
-3519.82
-3489.60
Tie on point
MWD Magnetic
Top whipstock
'10 June, 2001 - 3:29 Page 2 of 4 DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for G-25APB1
Your Ref: API200292~ 65270
Job No. AKMW~O~56, Surveyed: f5 May, 200~
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
11121.09 83.610 294.520 8915.10 8987.50 110.43 S 4144.86 E 5969008.99 N 662400.26 E
11158.49 87.490 300.510 8918.00 8990.40 93.21 S 4111.81 E 5969025.51 N 662366.86 E
11186.69 88.110 304.380 8919.09 8991.49 78.09 S 4088.03 E 5969040.12 N 662342.77 E
11216.29 87.750 307.560 8920.16 8992.56 60.72 S 4064.10 E 5969056.99 N 662318.47 E
11250.49 88.810 312.490 8921.18 8993.58 38.74 S 4037.93 E 5969078.41 N 662291.85 E
11280.09 87.580 314.250 8922.12 8994.52 18.43 S 4016.42 E 5969098.26 N 662269.92 E
11313.09 88.020 316.900 8923.38 8995.78 5.12 N 3993.34 E 5969121.32 N 662246.35 E
11350.29 88.550 311.260 8924.50 8996.90 30.97 N 3966.64 E 5969146.61 N 662219.11 E
11385.49 89.600 305.970 8925.07 8997.47 52.93 N 3939.15 E 5969167.98 N 662191.16 E
11415.69 90.840 302.090 8924.95 8997.35 69.83 N 3914.13 E 5969184.35 N 662165.79 E
11452.00. 91.370 301.390 8924.25 8996.65 88.93 N 3883.26 E 5969202.79 N 662134.52 E
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 26.675° (10-May-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well Reference and calculated along an Azimuth of 305.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11452.00ft.,
The Bottom Hole Displacement is 3884.27ft., in the Direction of 88.688° (True).
Dogleg
Rate
(°/100ft)
6.711
19.039
13.888
10.805
14.738
7.252
8.134
15.221
15.319
13.488
2.418
Alaska Drilling & Wells
PBU WOA G Pad
Vertical
Section Comment
-3458.61
-3421.66
-3393.51
-3363.94
-3329.90
-3300.63
-3268.22
-3231.52
-3196.40
-3166.22
-3129.97
Projected survey
June, 2001 - 3:29 Page 3 of 4 DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for G-25APB1 '
Your Ref: API200292165270
Job No. AKMWfO:156, Surveyed: ~5 May, 200~i
North Slope Alaska
Alaska Drilling & Wells
PBU WOA G Pad
Comments
Measured
Depth
(ft)
Station Coordinates
TVD North ings Eastings
(fi) (ft) (ft)
10100.00 8661.99 106.78 S 4625.38 E
10168.00 8721.81 116.41S 4656.26 E
11452.00 8996.65 88.93 N 3883.26 E
Comment
Tie on point
Top whipstock
Projected survey
Survey tool program for G-25APB~
From To
Measured Vertical Measured
Depth Depth Depth
(ft) (ft) (ft)
Vertical
Depth
(ft)
0.00 0.00 10100.00 8661.99
10100.00 8661.99 11452.00 8996.65
Survey Tool Description
AK-3 BP_HM - BP High Accuracy Magnetic (G-25)
MWD Magnetic (G-25APB1)
10 June, 2001 - 3:29 Page 4 of 4 DrillQuest 2.00.08.005
.. 06/19/01
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrle
NO. 1231
Company:
S~ate of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Sepia Prints CD
),22A 11'/-20~ 21287 SCMT 05123101
~).S. t1-35 J~/~- 0[~-~ 21286 SCMT 05122/01
~-25A 2,'~]° O[e rD 21279 MCNL 05/27/01
D.S. 2-03B /~..1~-' ~[,l'"J 21278 ~,ICNL 0513010t
C-33A '~_OID -.~_h~, 21058 MCNL (REDO) 01/28/01
*REDO - Changed depth shift edits - remove below KOP of A well.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Schlumberger GeoQuest RECEIVED
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherde . JUN 2 2 2001
ALASI~k OIL ANrD GAS
CON~ilI~RYAT101~I COMMISSIO1NI
Dan Kara
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
TONY KNOWLES, GOVERNOR
333 W. 7TM AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re'
Prudhoe Bay Unit 'G-25A
BP Exploration (Alaska) Inc.
Permit No: 201-065
Sur Loc: 2617' SNL, 1973' WEL, SEC. 12, T1 IN, R13E, UM
Btmhole Loc. 1935' SNL, 1290' EWL, SEC. 07, T1 IN, R14E, UM
Dear Mr. Kara:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting determinations are made.
Information regarding a "safety joint" for running the 3-3/16" portion of the planned production liner has
been received from Mr. Ted Stagg. Providing such a "safety joint" equipped with a suitably sized lifting
sub and threaded crossover to mate with the 3-3/16" liner section should lessen the time required to install
the joint should a flow be observed while nmning the liner. However, be advised that the Commission
views the use of this joint as an interim measure pending the receipt of pipe rams capable of sealing on
this size pipe. Not later than May 15, 2001, Alaska. Drilling and Wells (BP Exploration Alaska) is
directed to provide the. Commission with information regarding the availability/deliverability of rams
sized for 3-3/16" and other such sizes that you may plan to nm.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 036. Sufficient
notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a
test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission
petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
.... ~L/:,,,.,'~,, ............ '!' i/' ~,, ,, i'4~!''i'i' '
Julie M. Heusser
Commissioner
BY ORDER OF THE COMMISSION
DATED this ":; ~"~"~ ....
....~: ...... day of April, 2001
jjc/Enclosures
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKAI' -AND GAS CONSERVATION COMM~ ION
PERMIT TO DRILL
20 AAC 25.005
I [] Exploratory [] Stratigraphic Test [] Development Oil
la. Type of work [] Drill [] Redrill lb. Type of well [] Service [] 'Development Gas [] Single Zone [] Multiple Zone
[] Re-Entry [] Deepen
2. Name of Operator ,5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 72.40 Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028304
!4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 2O AAC 25.025)
2617' SNL, 1973' WEL, SEC. 12, T11N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
2693' SNL, 2548' EWL, SEC. 07, T11N, R14E, UM G-25A Number 2S100302630-277
At total depth 9. Approximate spud date
1935' SNL, 1290' EWL, SEC. 07, T11N, R14E, UM 05/04/01 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028280, 1290' MDI No Close Approach 2560 12245' MD / 8906' 'I'VD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 10168' MD Maximum Hole Angle 108 ° Maximum surface 2200 psig, At total depth (TVD) 8800' / 3100 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casin,q Wei,qht Grade Couplin,q Len,qth MD TVD MD TVD (include sta,qe data)
3-3/4" 3-3/16'x2-7/a' 6.2#/6.4# L-80 TCII / STL 2895' 9350' 7945' 12245' 8906' 112 cu ft Class 'G'
19. To be comPleted for Redfill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 10600 feet Plugs (measured)
true vertical 9108 feet
Effective depth: measured 10504 feet Junk (measured) Fill at 10504' MD (03/89)
true vertical 9021 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" 9 cu. yds. Concrete 110' 110'
Surface ' 2746' 13-3/8" 3890 cu. ft. Permafrost 2785' 2685'
Intermediate 9688! 9-5/8" 590 cu. ft. Class 'G' 9724' 8337'
Production
Liner 1138' 5-1/2" 484 Cu. ft. Class 'G' 94~2'2_10_600' 8113'-9108'
ECEI
Perforation depth: measured OPen: 10458'- 10474, ~AJ~ 3 0 2001
Straddled: 10375' - 10385'; Sqz: 10406' - 10445'
true vertical Open: 8980' - 8994' ~,las/(a 0il & Gas Cons. Commission
Straddled: 8905'-8914'; Sqz: 8933'-8968' Anchorage
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Ddlling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Dan Kara, 564-5667 Prepared By Name/Number: Terde Hubble, 564-4628
21. I hereby certify that the foregoi[~,g-is-ljrue and correct to the best of my knowledge ,
.,-- ,~~~ Title CT Drilling Engineer Date ~/2-..~/0' --
Signed
Dan
Kara
:.;'~ii!,.:,.;.:.~i.~?~ ' '-: .".. '.. '".:"" :. ' "."'..' ~'' '...' .... . .:.' .".'!.~:: :", ':.. :,..,.c;"'- "::'~ . "C~mmlsslon'Use Oly ..".'-;':,.-'."' ... ' .....-.:..~. '. :,.,'-!..-','i:.' ':". :',~:'~' :",.. ',.'-..'....' · ...:.-
"?'" r""APlN'u~nber ' ' 'n I' "¢~ '1~1e' Isee c°ver letter
'P;'~it Numbe ' (:;~'
..~_~,,/--' ~ ~_'~%~" [ 50- 029-21652-01 ~j for other requirements
ConditiOns of Approval: Samples Required [] Yes 1~ No Mud LO(. ~ulr~l [] Yes ~' No
Hydrogen Sulfide Measures ~ Yes [] No Directional Survey Required ~ Ye.s [] No
Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K ~1~3.5K
psi for CTU
Other: ORIG, NAL SIGNED [~Y by order of7.
Approved By J. Nit, Hetlsser Commissioner the commission Date .
Form 10-401 Rev. 12-01-85 ORIGINAL
Subl Triplicate
BPX Prudhoe Bay
Producer G-25A CTD Sidetrack
Summary of Operations:
G-25 is being sidetracked to improve recovery of lower Zone 1 reserves. This sidetrack will be conducted
in two phases.
( ~ Phase 1 Prep Work: Install mechanical whipstock, P&A well, mill window
~ Plans are to begin prep work as early as April 16, 2001 to provide options in the event of an early
~, Kuparuk River breakup.
.,.,,1~3'~ ~ · Drift tubing, perform integrity test of inner annulus.
" ,x-xc-X / · Install mechanical whipstock at 10168' md
~.-% / · RU service CTU, pump 13.8 ppg bentonite cement to isolate existing perfs.
:Y" { · Mill out cement to WS, mill 3.80" window at 10168'.
Phase 2: Drill and Complete sidetrack: Plans are to be ready to sidetrack as early as May 4, 2001 to
provide options in the event of an early Kuparuk River breakup.
Coiled tubing drilling will be used to drill and complete the directional hole as per attached plan.
Mud Program: · Phase 1: Seawater for window milling
· Phase 2: Flo-Pro (8.5 ppg) for drilling operations.
Disposal: · No annular injection on this well.
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program: ~----%~3b~ ~'~[~ ~
· 3-3/16", 6.2# STL L-80 x 2 7/8", 6.4#, L-80 TCII liner will be run from TD to approx. 9350' MD and
cemented with approximately 20 bbls. The 3-3/16" x 2-7/8" XO will be placed -2 joints outside the
window at -10230' to provide for future sidetracking opportunities. Top of cement is planned to be at
~9800'. The liner will be pressure tested and perforated with coiled tubing conveyed guns.
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2000 psi.
Directional · See attached directional plan
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
RECEIVED
I 4AR 30 2001
,.,.~ , .& Cons. Commissio.
~, ,~,
Logging · A Gamma Ray log will be run in the open hole section.
· A Memory CNL may be run in cased hole.
Hazards
· Lost circulation risk is low.
· H2S has not been measured from this well. This is not an H2S Drillsite. Max H2S measurement on
the pad is 10 ppm.
Reservoir Pressure · Res. pressure is approx. 3100 psi @ 8800 tvd (6.8 ppg EMW)
· Max. surface pressure with gas (0.1 psi/ft) to surface is 2200 psi.
G-25A Potential Drilling Hazards
Post on Rig
1. Please perform pre-job Hazard ID and Safety meetings prior to every change in work scope
during the operation. Also, if things don't feel right shut-down the operation and discuss the
situation before making the next operational move. SAFETY FIRST.
2. H2S has not been measured from this well. This is not an H2S Drillsite. Max H2S
measurement on the pad is 10 ppm.
3. Reservoir pressure is approx. 3100 psi @ 8800 tvd, or 6.8 ppg EMW.
4. Maximum anticipated well head pressure w/full column of gas 2200 psi.
5. Risk of lost circulation is low.
6. Close approach to well G-30 at a wellplan MD of 10,410'. Should not be a problem given that
G-30 will be -45' TVD shallower than the proposed wellplan.
TREE: 6" McEVOYG2 5 KB. ELEV= 72.40'
WELLHEAD: McEVOY i BF. ELEV = 36.50'
ACTUATOR: OTIS
---~.~ ~ -.4-1/2 SSSV LANDING NIPPLE
, (OTIS) (3.813" ID)
Cemented ~ _
I
13 318" 72# --
12'785 I~l ! k
L-80
BTRS
I KOP: 1400'
MAX ANGLE: 40° @ 8100'
9 5/8", 47#/ft, L-SO, NSSC 15,070 I~
/4-1/2" SLIDING SLEEVE
~ (OTIS XA) (3.813" ~D) I 9,249
4-1/2-12.6# L-80 BTRS (,PC) 1 ~ '~ ~~/TUB~NG SEAL ASS¥. I
CAPACITY: 0.01522 BBL/FT
~' ~8-5/8" PACKER
i i~' J(TIW)(4'750"ID) I .....
~ ~ ~ 4-1/2", 12.6#/ft, L-80 TAILPIPE
~4-1/2" "X" NIPPLE
(OTIS) (3.813" ID) [9,375
I I
I I~ ~4'1/2" "XN" NIPPLE
(OTIS) (3'725" ID) 19'416
Top of 5-1/2"Liner ~
Tie-Back Sleeve19,461 I.----4 ' 1 ~
"~ 1/2" TIW SEAL
ASSBLYw/o SEALS 19,465
9-5/8", 47#/ft, L-80, BTRS [ 9,724
k
'~~'5-1/2"MARKER JOINT I 9,780
· ~. 4" GS Fish Neck to 3-3/8" Baker,~ 0,360
Inflatable Straddle Packer set at .
10,367-10,393 elmd, min ID 1.25"
PERFORATION SUMMARY
REF. LOG: GEARHART- BHCS 11-29-86
TIE IN LOG:
3-3/8" 10,375- 10,385 ISqzd 8-15-91
Above Perf Straddled
27,8" 4 10,406-10,445 SqzdS-15-91 RE
3 3/8" 6 10,458 - 10,474 Open 8-19-91
PBTD 10,557 [ Alaska
5 1/2", 17#/ft, L-80, TC4S t0,600 I
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
1
2-4-86
Initial
Riq
C0mDletion
WELL: G-25 {32-7-11-14)
4-25-93 RDC Set GSO Straddle Packer
11-02-95 BR Pull Staddle Packer APl NO: 50-029-21652
4-23-96 Nords Set Straddle Packer SEC 12; TN 11N; RGE 13E
1/22/99 Nords Update to PC
BP Exploration (Alaska)
30 200!
~S Coils.C0~ITIi$$J01~'
chorale
TREE = 6" McEVOY
WELLHEAD= McEVOY
ACTUATOR= OT~
KBi = 721~4
KQP = 1400
Max Angi;"= ............. 40"@§i"00'
Datum MD = 10338
13-3/8" CSG, 72#, L-80, ID=12.347 Iff 2785'
[ 9-5/8" CSG, 47#, L-80, ID=8.681 ['~ 5070'
5070'
TOP OF 9-5/8" CSG
G-25A i'
PROPOSED CTD SIDETRACK
2072' I-I
4-1/2" SSSV OTIS LNDNG NIP, ID:3.813 I
2780' Id C~T~ I
92 e' I-I
4-1/2" OTIS XA SLIDING SLV, ID=3.813 I
Minimum ID = 1.25" @ 10360'
STRADDLE PACKER
TOP OF PROPOSED 3-3/16" LINER Iff 9350'
9308' I-I
9322' I-i
9375' H
TIW SBR TBG SEAL ASSY I
9-5/8" x 4-1/2" TIW PKR, ID=4.750 I
4-1/2" OTIS X NIP, ID=3.813 I
--~ 9416' I-I 4-1/2" OTIS XN NIP, ID:3.725, EMD:9414']
4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID:3.958 Id 9460' [--
ELMD TBG TAIL
9465' Id
5-1/2" TIW SEAL ASSY W/O SEALS
9461'
9-5/8" CSG, 47#, L-SO, ID=8.681 I--I 9724'
IMARKERJ°'NT Id 9780'
Mill Window off Mechanical Whipstock ['--[
10168'
I3-3/4" Open Hole
10230' I--~ 3-3/16"X2-7/8"
PERFORATION SUMMARY
REF LOG: BHCS on 11/29/86
ANGLE AT TOP PERF:I 27 @ 10375' I
Note: Refer to Production DB for historical perf data
SIZE
3 3/8
2 7/8
3 3/8
SPF INTERVAL OPN/SQZ DATE
1 10375 -10385 S 08/15/91
4 10406-10445 S 08/15/91
6 10458-10474 O 819/91
I2-7,.'8". 4.6#. L-80. STL LINER- Cemented & Perforated
[ 10360'
4" GS FISH NECK TO 3-3/8" BAKER
INFLATABLE STRADDLE PACKER
SETAT 10367-10393' ELMD, MIN
ID=1.25
I ~TDI-"I 1o557'
P&A'd w/13.8 ppg Cement
I 5-1/2" LNR, 17#, L-80, 0.0232 bpf, ID:4.892 10600'
DATE REV BY COMMENTS
12/4/1986 ORIGINAL COMPLETION
2/15/2001 SIS-lsl CONVERTED TO CANVAS ...
03/01/01 SIS-MD FINAL
03/29/01 PCR CTD Proposed Sidetrack
PRUD ,
PERMIT No: 86-1620
A PI No:~:~2~5~e1
Sec. 7, T11 N, R14E
B~-~i~t~,~§! C0mmis~'
OqW~e
ObP
BP Amoco
Baker Hughes INTEQ Planning Report
LLNTFQ
Company: BP Amoco
Field: Prudhoe Bay
Site: PB (3 Pad
Well: (3-25
Wellpath: Plangl04 (3-25A
Date: 3/29/2001 Time: 11:03:32 Page: 1
Co-ordinate(NE) Reference: Well: (3-25, True No~th
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,305.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Goo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: B(3GM2000
Site: PB (3 Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5966832.87 ft Latitude: 70 18 58.211 N
656301.39 ft Longitude: 148 43 59.013 W
North Reference: True
Grid Convergence: 1.19 deg
Well: G-25 Slot Name: 25
G-25
Well Position: +N/-S 2158.16 ft Northing: 5969032.00 ft Latitude: 70 19 19.434 N
+E/-W 1998.11 ft Easting: 658254.00 ft Longitude: 148 43 0.699 W
Position Uncertainty: 0.00 ft
Wellpath: Plan#104 G-25A Drilled From: G-25
500292165201 Tie-on Depth: 10168.00 ft
Current Datum: 31: 25 11/17/1986 00:00 Height 72.40 ft Above System Datum: Mean Sea Level
Magnetic Data: 3/29/2001 Declination: 26.70 dog
Field Strength: 57477 nT Mag Dip Angle: 80.79 dog
VerticaISection: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 305.00
Plan: Plan #104 Date Composed: 3/29/2001
Version: 1
Principal: Yes Tied-to: From: Definitive Path
Targets
Map Map <-- Latitude ---> <-- Longitude -->
Name Description TVD +N/-s +E/-W Northing Easting Dog Min Sec Dog Min Sec
Annotation
MD · · 'TVD ."
10100.00 8589.59 TIP
10168.00 8649.41 KOP
10304.00 8762.08 1
10439.41 8845.70 2
10574.58 8896.66 3
10708.97 8913.79 4 RECEIVED
11079.54 8914.73 5
11409.78 8936.24 6
11544.40 8945.07 7 MAR 50 2001
11669.34 8945.88 8
11969.47
8947.84
9
Alaska 0il & Gas Cons. Commissk
12245.00 8906.39 TD
Plan Section Information
10100.00 28.62 107.31 8589.59 -106.78 4625.38 0.00 0.00 0.00
10168.00 28.18 107.31 8649.41 -116.40 4656.26 0.65 -0.65 0.00
10304.00 45.81 177.05 8762.08 -177.55 4691.08 31.60 12.96 51.28
10439.41 61.53 229.19 8845.70 -269.49 4646.30 32.51 11.61 38.51
10574.58 76.13 274.15 8896.66 -305.36 4530.10 32.62 10.80 33.26
80.34
ObP
BP Amoco
Baker Hughes INTEQ Planning Report
Company: BP Amoco
Field: Prudhoe Bay
Site: PB G Pad
Well: G-25
Wellpath: Plard¢104 G-25A
Date: 3/29/2001 Time: 11:03:32 Page: 2
Co-ordinate(NE) Reference: Well: G-25, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,305.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Plan Section Information
MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg
10708.97 89.85 316.26 8913.79 -249.33 4412.78 32.65 10.21 31.33 75.35
11079.54 89.87 278.36 8914.73 -82.39 4089.49 10.23 0.01 -10.23 269.98
11409.78 82.87 311.88 8936.24 55.09 3795.38 10.34 -2.12 10.15 102.58
11544.40 89.63 323.51 8945.07 154.25 3705.21 9.97 5.02 8.64 60.26
11669.34 89.63 336.01 8945.88 261.96 3642.41 10.01 0.00 10.01 90.04
11969.47 89.64 305.01 8947.84 490.76 3453.87 10.33 0.00 -10.33 269.92
12245.00 107.54 326.23 8906.39 682.70 3264.36 9.98 6.50 7.70 48.35
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ft deg deg ff ft ft ft ft deg/100ft ft deg
10100.00 28.62 107.31 8589.59 -106.78 4625.38 5969022.78 662880.27 0.00 -3850.14 0.00 TIP
10125.00 28.46 107.31 8611.55 -110.33 4636.78 5969019.47 662891.75 0.65 -3861,52 180.00 MWD
10150.00 28.30 107.31 8633.55 -113.87 4648.13 5969016.17 662903.16 0.65 -3872.84 180.00 MWD
10168.00 28.18 107.31 8649.41 -116.40 4656.26 5969013.81 662911.34 0.65 -3880.95 180.00 KOP
10175.00 27.90 111.98 8655.59 -117.50 4659.36 5969012.77 662914.46 31.60 -3884.12 99.31 MWD
10200.00 28,21 128.81 8677.69 -123.41 4669.40 5969007.08 662924.63 31.60 -3895.73 95.19 MWD
10225.00 30.47 144.31 8699.51 -132.27 4677.72 5968998.40 662933.13 31.60 -3907.63 80.31 MWD
10250.00 34.29 157.26 8720.64 -143.93 4684.15 5968986.87 662939.81 31.60 -3919.59 66.78 MWD
10275.00 39.20 167.63 8740.69 -158.17 4688.57 5968972.74 662944.53 31.60 -3931.37 55.82 MWD
10300,00 44.86 175.89 8759.27 -174.71 4690.90 5968956.25 662947.20 31.60 -3942.77 47,50 MWD
10304.00 45.81 177.05 8762.08 -177.55 4691.08 5968953.41 662947.44 31.53 -3944.55 41.44 1
10325.00 46,54 186.46 8776.64 -192.66 4690.61 5968938.30 662947.29 32.51 -3952.83 87.17 MWD
10350.00 48.37 197.22 8793.57 -210.63 4686.81 5968920.25 662943.88 32.51 -3960.03 80,64 MWD
10375.00 51.14 207.24 8809.74 -228.24 4679.58 5968902.50 662937.02 32.51 -3964.20 73.36 MWD
10400.00 54.70 216.40 8824.83 -245.13 4669.05 5968885.39 662926.85 32.51 -3965.27 66,87 MWD
10425.00 58.89 224.73 8838.54 -260.97 4655.44 5968869.26 662913.58 32.51 -3963.20 61.34 MWD
10439.41 61.53 229.19 8845.70 -269.49 4646.30 5968860.56 662904.62 32.48 -3960.60 56.81 2
10450.00 62.16 233.04 8850.70 -275.35 4639.03 5968854.55 662897.47 32.62 -3958.01 80,34 MWD
10475,00 64.07 241.93 8862.02 -287.30 4620.25 5968842.20 662878.95 32.62 -3949.48 78.52 MWD
10500.00 66.50 250.51 8872.49 -296,43 4599.49 5968832.63 662858.39 32.62 -3937,71 74.49 MWD
10525.00 69.38 258,74 8881.89 -302.55 4577.17 5968826.04 662836.20 32.62 -3922.94 70.90 MWD
10550.00 72.64 266,65 8890.04 -305.54 4553.75 5968822.56 662812.85 32.62 -3905.46 67.81 MWD
10574.58 76.13 274,15 8896.66 -305.36 4530.10 5968822.25 662789.21 32.64 -3885.99 65.24 3
10575.00 76.16 274,29 8896.76 -305.33 4529.69 5968822.27 662788.80 32.65 -3885.64 75.35 MWD
10600.00 78.36 282.35 8902.28 -301.80 4505.59 5968825.29 662764.63 32.65 -3863.87 75.32 MWD
10625.00 80.78 290.28 8906.81 -294.89 4482.02 5968831.70 662740.92 32.65 -3840.60 73.54 MWD
10650,00 83.36 298,09 8910.27 -284.75 4459.45 5968841.36 662718.14 32,65 -3816.30 72.10 MWD
10675.00 86.07 305.83 8912.58 -271.58 4438.35 5968854.08 662696.77 32.65 -3791.46 71.02 MWD
10700,00 88.85 313.51 8913.69 -255.65 4419.14 5968869.60 662677.23 32.65 -3766.59 70.30 MWD
10708.97 89.85 316.26 8913.79 -249.33 4412.78 5968875.79 662670.74 32.61 -3757.75 69.96 4
10725,00 89.85 314.62 8913.83 -237.91 4401.53 5968886.97 662659.25 10.23 -3741.98 269,98 MWD
10750.00 89.85 312.06 8913.90 -220.75 4383.35 5968903.74 662640.72 10.23 -3717.25 269.98 MWD
10775,00 89.85 309.51 8913.96 -204.42 4364.42 5968919.66 662621.45 10,23 -3692.38 269.99 MWD
10800.00 89.85 306.95 8914.03 -188.96 4344.79 5968934.71 662601.49 10.23 -3667.42 270.00 MWD
10825,00 89.85 304.39 8914.10 -174.38 4324.48 5968948.85 662580.88 10,23 -3642.43 270.00 MWD
10850,00 89.85 301.83 8914.16 -160.72 4303.54 5968962.06 662559.66 10.23 -3617.44 270.01 MWD
10875.00 89.85 299.28 8914.23 -148.02 4282.01 5968974.31 662537.87 10.23 -3592,52 270.02 MWD
10900.00 89.85 296.72 8914.29 -136.28 4259.94 5968985.58 662515.56 10.23 -3567.71 270.02 MWD
10925.00 89.85 294.16 8914.36 -125.54 4237.37 5968995.84 662492.77 10,23 -3543.06 270.03 MVVD
10950.00 89.86 291.60 8914.42 -115.82 4214.34 5969005.07 662469.54 10.23 -3518.62 270.04 MWD
10975.00 89.86 289.05 8914.48 -107.14 4190.89 5969013.26 662445.92 10.23 -3494.43 270.04 MWD
11000.00 89.86 286.49 8914.54 -99.51 4167.09 5969020.38 662421.96 10.23
11025.00 89.86 283.93 8914.60 -92.96 4142.97 5969026.43 662397.71 10.23
MAR 30 2001
Obp
( BP Amoco
Baker Hughes INTEQ Planning Report
I~111
Company: BP Amoco
Field: Prudhoe Bay
Site: PB G Pad
Well: G-25
Wellpath: Plargfl04 G-25A
Date: 3/2912001 Time: 11:03:32 Page: 3
Co-ordinate(NE) Reference: Well: G-25, Tree North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,305.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ft dog deg ft ft ff ft ff deg/100ft ff deg
11050.00 89.87 281.37 8914.66 -87.48 4118.58 5969031.39 662373.21 10.23 -3423.92 270.06 MWD
11075.00 89.87 278.82 8914.72 -83.10 4093.96 5969035.25 662348.51 10.20 -3401.24 270.08 MVVD
11079.54 89.87 278.36 8914.73 -82,39 4089.49 5969035.86 662344.02 10.20 -3397.17 270.09 5
11100.00 89.41 280.42 8914.86 -79,05 4069.31 5969038.77 662323.78 10.34 -3378.72 102.58 MWD
11125.00 88.85 282.95 8915.24 -73.99 4044.83 5969043.32 662299.20 10.34 -3355.77 102.57 MWD
11150.00 88.29 285.47 8915.86 -67.85 4020.60 5969048.94 662274.85 10,34 -3332.41 102.53 MWD
11175.00 87.73 288.00 8916.73 -60.66 3996.68 5969055.63 662250.78 10,34 -3308.68 102.47 MWD
11200.00 87.18 290.53 8917.84 -52.42 3973.10 5969063.37 662227.04 10,34 -3284.64 102.38 MWD
11225.00 86.63 293.06 8919.19 -43.15 3949.93 5969072.14 662203.67 10.34 -3260.34 102.27 MWD
11250.00 86.09 295.59 8920.78 -32.88 3927.19 5969081.94 662180.73 10.34 -3235.83 102.13 MWD
11275.00 85.56 298.13 8922.60 -21.62 3904.95 5969092.73 662158.26 10.34 -3211.15 101.97 MWD
11300.00 85.04 300.67 8924.64 -9.39 3883.24 5969104.49 662136.30 10.34 -3186.35 101.78 MWD
11325.00 84.53 303.21 8926.92
11350.00 84.02 305.76 8929.41
11375.00 83.53 308.31 8932.12
11400.00 83.05 310.87 8935.04
11409.78 82.87 311.88 8936.24
3.78 3862.12 5969117.21 662114.90 10.34 -3161.49 101.58 MWD
17.87 3841.62 5969130.86 662094.11 10.34 -3136.62 101.34 MWD
32.83 3821.78 5969145.41 662073.96 10.34 -3111.79 101.09 MWD
48.65 3802.65 5969160,82 662054.50 10.34 -3087.04 100.81 MWD
55.09 3795.38 5969167,10 662047.10 10.42 -3077.40 100.39 6
11425.00 83.62 313.21 8938.03 65.31 3784.24 5969177.08 662035.75 9.97 -3062.41 60.26 MWD
11450.00 84.87 315.38 8940.54 82.68 3766.44 5969194,07 662017.59 9.97 -3037.87 60.10 MWD
11475.00 86.13 317.54 8942.50 100.74 3749.27 5969211.77 662000.05 9.97 -3013.44 59.89 MWD
11500.00 87.38 319.69 8943.91 119.47 3732.77 5969230.14 661983.16 9.97 -2989.19 59.72 MWD
11525.00 88.65 321.84 8944.78 138.82 3716.97 5969249.15 661966.95 9.98 -2965.14 59.60 MWD
11544.40 89.63 323.51 8945.07 154.25 3705.21 5969264.33 661954.87 9.98 -2946.66 59.53 7
11550.00 89.63 324.07 8945.11 158.77 3701.90 5969268.78 661951.47 10.01 -2941.35 90.04 MWD
11575.00 89.63 326.57 8945.27 179.33 3687.68 5969289.03 661936.81 10.01 -2917.91 90.04 MWD
11600.00 89.63 329.08 8945.43 200.48 3674.37 5969309.90 661923.06 10.01 -2894.87 90.02 MWD
11625.00 89.63 331.58 8945.59 222.20 3661.99 5969331.35 661910.23 10.01 -2872.28 90.00 MWD
11650.00 89.63 334.08 8945.75 244.44 3650.58 5969353.34 661898.35 10.01 -2850.17 89.99 MWD
11669.34 89.63 336.01 8945.88 261.96 3642.41 5969370.68 661889.82 9.98 -2833.43 89.97 8
11675.00 89.63 335.43 8945.92 267.12 3640.08 5969375.79 661887.38 10.33 -2828.57 269.92 MWD
11700.00 89.63 332.84 8946.08 289.61 3629.18 5969398.05 661876.00 10.33 -2806.73 269.92 MWD
11725.00 89.62 330.26 8946.24 311.59 3617.27 5969419.77 661863.64 10.33 -2784.37 269.94 MWD
11750.00 89.62 327.68 8946,41 333.01 3604.38 5969440.91 661850.30 10.33 -2761.53 269.96 MWD
11775.00 89.62 325.10 8946.57 353.83 3590.54 5969461.43 661836.03 10.33 -2738.25 269.97 MWD
11800.00 89.62 322.51 8946,74 374.00 3575.78 5969481.29 661820.84 10.33 -2714.59 269.99 MWD
11825.00 89.62 319.93 8946,90 393.49 3560.13 5969500.44 661804.78 10.33 -2690.59 270.01 MWD
11850.00 89.62 317.35 8947.07 412.25 3543.61 5969518.85 661787.87 10.33 -2666.30 270.03 MWD
11875.00 89.63 314.76 8947.23 430.25 3526.26 5969536.47 661770.15 10.33 -2641.76 270.04 MWD
11900.00 89.63 312.18 8947.39 447.45 3508.12 5969553.29 661751.65 10.33 -2617.04 270.06 MWD
11925.00 89.63 309.60 8947.55 463.81 3489.22 5969569.25 661732.42 10.33 -2592.17 270.08 MWD
11950.00 89.64 307.02 8947.71 479.31 3469.61 5969584.32 661712.48 10.33 -2567.22 270,09 MWD
11969.47 89.64 305.01 8947.84 490.76 3453.87 5969595.44 661696.51 10.31 -2547.76 270.06 9
11975.00 90.01 305.42 8947.86 493.95 3449.35 5969598.53 661691.92 9.98 -2542.23 48.35 MWD
12000.00 91.66 307.29 8947.49 508.77 3429.22 5969612.92 661671.49 9.98 -2517.24 48.35 MWD
12025.00 93.32 309.16 8946.41 524.22 3409.60 5969627.95 661651.54 9.98 -2492.30 48.38 MWD
12050.00 94.97 311.03 8944.60 540.27 3390.53 5969643.60 661632.14 9,98 -2467.47 48.46 MVVD
12075.00 96.62 312.91 8942.07 556.91 3372.04 5969659.84 661613.30 9.98 -2442.78 48.59 MVVD
12100.00 98,26 314.81 8938.83 574.08 3354.16 5969676.63 661595.07 9.98 -2418.29 48.78 MWD
12125.00 99,89 316.72 8934.89 591.77 3336.94 5969693.95 661577.48 9.98 -2394.04 49.03 MWD
12150.00 101,51 318.65 8930.25 609.93 3320.41 5969711.76 661560.57 9.98 -2370.08 49.33 MWD
12200.00 104.71 322.58 8918.90 647.55 3289.51 5969748.72 661528.89 9.98 -2323.1 1
ObP
BP Amoco
Baker Hughes INTEQ Planning Report
tNTEQ
Company: BP Amoco Date: 3/29/2001 Time: 11:03:32 Page: 4
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: G-25, True North
Site: PB G Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: G-25 Section (VS) Reference: Well (0.00N,0.00E,305.00Azi)
Wellpath: Plan#104 G-25A Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ff deg deg ff ft ff ft ft degll00ft ff deg
12225.00 106.29 324.60 8912.22 666.93 3275.21 5969767.80 661514.19 10.00 -2300,36 50.58 MWD
12245.00 107.54 326,23 8906.39 682.70 3264.36 5969783.33 661503.00 10.00 -2282.43 51.12 TD
RECE[VED
MAR 50 2001
~k.~ska Oil & Gas Cons. Com$iss;
Anchorage
BP
Amoco
O bp Pta~04 G-25A Magnetic Fieldl Conlar, I Informa!lor,
Skength: 57477nT !
WELLPATH DETAILS DipAngle: 80.79° ! D,recl. (907) 267-6b 13
Date: 3/29/2001 J E-m:aiJ br,j polr,,sLS~ird,,~';!.C~m
Plan#104 G-25A -~'~ Model: BGGM2000 J Baker H
500292165201
Parent Wellpath: G-25
Tie on MD: 10168.00 , . .... . .... ~ .. ~ ~ ~ : , ; . ~ ........
· 11rv-~---:l-.~. '&..._.i:4...L~.i~'&~...~ :.:.¥¥.-:~-{*i:'.:~..-c ::.:..~...! ..... :.~'.~.~.~.~:.F?~:o....'~?=..-...~....'-...+'-..:..-~ ..... :T?*? ~-..--~ ~-. ..... !~ .... ! ...... ! ...... ,. ..... ! ............
Ref. Da~Ri~m:: 31:25111171198600:00 72.40ff '~ ~:':~ ,"~' i '~';i ,:"i ,':', :'~'"; ..'.:' ~ L'!".~ .:" "~!..' ~;" '~.".'.'.} '.'i '" ".'"~ ~ . : ; ; i ; ,
~:;.-~.:'~:':' ';~:~ ~':": ;:::.[ .~'.:.: q'.;' .!:: 'i:i:: '/., ::'.! ::..'i ':..: ~:';~'.~ ':. -~ - ~- ~, -; : ; ~
'--~.~.--,+<~:-~r~-=.,~.=.'~-=-~r-q¥=':=c=.'. c:::'~'i""q ,~.~ '? ? :: i ~ ~ ~ .
V.SectionOrigin Origin Starting lu~v~ '~ 'c . '~' ~' ~ '.' . · .~ . . ~. : . . ~ I ]
Angle +N]-S +F_J-W From 'I'VD · ; ~ ~. i..: '.'.. L, =.., .. ~ .- .. =.' · ~ ' · ·: '.', .-; .: : ~ ~' - } ' ~ , ' · : ', ,
..... =". .,".'.?~"' ..r. :!'. .'i.:~...~ ','.h '.:'.~:~ .:': Li." ~." L.' .; ~ ~' ~...L.~.~.~ ........ ~ ..... 4- -~ ~ ...... ~ .....
305.00" 0.00 ' 0.00 0.00 900~"~£;'"'~4L.'-'~-'~2~}"; ..... ; ....... { ....... i.!-...~ ...... ;.,.-;~.-~.o~-~--.~.-~.--?r ...... ;:---.--?~.~=-%~--~- ·: ~ ~ ; , , ~ : i , -
'1 _;'"~ ; i ~'~ ~ ~'~ ."~ ..... [ .... .: ..'.'~ : ..: ~...' ~.'. ..:; .' : -.--,' . . ;-,. . i ~' , ,, . ,
REFERENCE INFORMATION p~!.'..i..[.!.L.~:~..~.~.'~ii.~..~i~o.~._'i:i.L~_-~[X..~4~ ¥..i.~.;!....~.i.~--Z...i~ ...... i--~=!:i--=-iL:Xi.~.. ,~-~---~m: .... X__~L:.,.-r~J .... f.~ ...... ~ .....i .... -J ......
'. '"~.'i .",': ~..'.: '.' ~".i"' ~ ' ~E : ' .! :i: ~ ~ ''" .~ . : :i .; .~ i ~ ~ ! I
Co-ordinate (N/E) Reference: WellCentre:G-25, TrueNorth -~ ~ .~.:... ~; ~..' ~.:. a.h ~.' ..... .~.. '.!- ..! .~, '.:' ' .'' :' _r , .... ' ' '
VerlJcel (TVD) Reference: System: Mean Sea Level ~.~ _ ~.:' ~.~..;.' .~.~....~.~..'.~.~..,.~.'~£.~x.~ ....... 2~.~....~2~.;;.?.~.~L:; ~..;...-'.~..;~: ....... f---' ~ ..... ~'U ~T". ~~-' ........? ..... ~ ..... b ....~ ...... . ........ !~ .... ~ .......... ~ .
SecUon(VS)Reference: Slot- 25 (0.00N,0.00E) ~J-4 -.:..;..~' .... :"' ;..'' ;' ~ .', · · : '~.." , :'. ' ....
:" "' ': .;.' . ,'T' '. ~' , .'~ .' '~ . ::' '-', ; · J .. . ~ ~ · ..~ : ! :. ~ .~ . '. : ': ~
Measured Depth Reference: 31:2511/17/198600:00 72.40 ~ '.:.' i '¥ .'i.:.; I ...... ~.~i~_~ .~.~.~.;.~..I:_.....~..~.~..:~.~.~:;~.~2._~..~.~. :L_.o.~L_ ..... ~ ....... i-'r---q ...... ~ .....,'.'-
CalculaUonMethod: Minimum Curvature i~e-- RP/~.--J - ' ~;"7-'i-"--="-¢-°"~i~?°":.-' ~-'- '~}..'"'1'¥71~.~.~- .,....7. ..: .~ ..... · : .- ~:. ~ : , , ,
,~_-"":J . ,:':":"~ ..¥' ?' : :"~:~.": '~.. "L-:'~X,:: :.':' .~. ..i .' i ~.-i ~ · '," ', ' ; ]
,~ ~'~'~ ~,' ~ :I '!'.i". ?". !:~..:i'.~ !.',-' i. :.' F~' .r~,, .~ .... L:__~:L,.,,~:..L.~L_=LX= ....... 'L-:---.J ..... ~--:~.-~ .... ~ ..... ~ .....
ANNOTATIONS
~._
~ ~J ..~ :. ,..: .... ~~. ,~...', .: . .. . ... , ,
~o. wO ~ ~o~.~o. j .~ ~" ~ .... r'r!TM ?-??~'~Ti:C~Tr~'"."TT "'~: :~?~ '~ · '~ ': i ' ~ ~ : ' '
.~... : .~. : .... ., :.. :. :... = .... . _ ~ . ~. ~ ~ ~ : ; '
2 ~r~9.4~ 10~.00 KOP ~ ~,-4UU'-q ........ ~...~· ~~-~:. ..~- ~ .... ~.~. ? ~ .... · .. ~ ' ~ ' . ~ , ~ ;
4 ~i~g. Tb m439.4~ ~ I
~..~
~ ~ · ' ........ ~':: ......... T.:'"'TT:"':'F.'~' ' FT. ~'~}' ;}' .~-~- ~ [.~~ ~ ,,'
;::.~':':';.[.'~.: ..V.: ~"q ~'":~': ":'[~'. ~:~. '":"(. -' [ :.. O-1~ ..... +"~? .......... ~"r ...... f~ ....... [': ........ f.~-.' : :
~.?.;:..~{:.':' ~;-:.'.'( ~: ~.:. t:"~:~. "'~'~ ./_;z ""J':....:..:.'~.b. ~ ."':.""~ - ":'~ '"::~"' "q' ' '~' ": : ' ', :
'-~'~-"'~ ........ '~'"~'~'~-"?'"T'; .... ¢'~=T~"~'"'? ~'"'"~: 7 -" . . ~: ' ' ~ . .. .-.. ~ ........
· ,,,,,,, .:-,., .... ,,,,:, , .... ..;-L .....
..:....:':/:~....~L.~,,fL..=..:;L. ..... ~ '...~': ~.: .~..~. i' :..':
'.L.:.. ~:'~:':. ,..~.:.: .... :... , ,.:.,.' ~. '.'. ~ ' .'..,:. ;. .'.. ~ ~ .:.:'; -3~ ..... ~TT"'":'.~T ....... ::-'¥': .....
~.,: J-",' ~ '"i:'; :'. -' ,';" '~' ".'. k"~" ~ .' ~.... ' ; ~"' . ::: ..... -~---.--' ......... ~.-~.-.~ ......... ~ ......... ~ ....... r---'~ ......... ~ .... · ' , - ,' ..... : : - ,
+:" '"7::":"::?
~ .: ,' ~.+.. : · ..~:~., ..~ . :~. ~: ._~ ........ , ..... ;~...:~....~ .... ~_~ ...... +....._.~. ..... ~ ..... ~ ........... ~ ..... ~ .... ~ ........ . .~-, __
~--~ .... ?""~'~"'"~? ....... [:~'~'~'"'~ ........ ~":'-~';~-': ' ~:. ~-"...h' · " · , ~ : ~
'~"'. :i.'',;.":' ~.'-:' ~ ~]~..:'~'..,..'~':.....~"~:~"' ~ .'".,'.." ~' . " ,' :. · ' : .... ~ · .', .... ,,,.
~..~'.: .... ~:';~ ~ .... ~"- -~'-~'~'+~ .......... ~"q'="+~"~" West(-)/East(+) [~OOft/in]
. -~.~.~::'~ ~ · .'~" ~1'. 'f': '~::~ ::".
~L:.'_b.,_:.:~+~..~-~ =~-.~.: ~:~-~-.-~ ........ ~ ...... ~-:-~-~ ...... ~ ;... ,,~.. ~.. ~. . ..:~ ~ · ~ ~ . ~. ~. ~ . ,
~:.- ~.. ,..:.:.'v.' .'".." ~ ',":':.'~ :'¢ .""' .'-~' :": :"{'~ ·" .':" .t"' :' -.'] - :~ :. ~ ' - ~ ' ~ ' , ' ~
_ : .~: _ ~_ _..:, __~ . ~':'' ~.'~"'"~ "'"~ ."~" ':" :~' .. ~:' '-~" '":-'-'r:' .~.:.:· r, ~..' ' ~.' . ~...~--.' .', ~' ~ ........ - ~ ........ ~ ...... ; .....~ ~_~.~ .....~ .... ~ ...........~ F .......
. .::~L~.~.:L..._,..L::~....~(L.~b~:'~:~....:~..~?L~..c~:F.<.:¥:~:~: .... ~ ...... ~:.=~..~ ...... ~. : ...~-.~.~-~.~- q ~ ~ ~ :..
.: ...'~ ,:'.' '~ .~.'~ . ': ' .~' , ~ · '.
. ~..;: :~ .... .: . ,... ~.~ ... , - . . :. -~. - ~ ~
'~-''' '~.' ~','' ':." ~ :Y'(' ~"~ '~F" ~ ": ~:'~ --~. ''~' '' '~'~"'''~ ' : '-~ '~ '* ' ~ ' ~ ~
-'A'"'...:.F' ,~ .'.~ · _' .::'~ ': · ~ : ~ ~ ~ ...... ~ ....~ ........ : ..... ~ .....~ ....~ ....... ~ ..... : ~.-{ ........
~";~ '" · ";' ::'. ~::: '~:';:' ~ ';"; ~ :~':'~ -':':.'" --~'~- -~--~;.~-.---~.~ ........ ~ ~.~.,,~.~.~ ~=~' .... r':-~r'-~-~*---~ :. ' ~ i~,~
~.':. ~.,. ~ · ·.: ~ ~ . . , ,
' ~". ".~ ~:". ~ I ' '~ ::'~ : ..~ ~ ~-~.--~ ..... ~ ............. ~ ~'-~- ...........
"~-.~ '-'~ ':'" ' ~' ~' ~:"" ~ :' ~'~':;.'.~ -: :":;....--~ ..'~ : ' ~ ~/ ~~.-~ ~ ..... 1- --
,=+~:.'~4':.'..-4.*.:;:: q+'~-'--¢+-'--:.;~=+u ~-;-:~ ,':: i"?--~: ....................................... ~ '
-~-.~:--'::"--~?~ "~'~'=~ ........ ?7 ......... " '~ ~'"'" : · ~ ~ ; : ;
.. ..., . ,. , ~ - ... ~ .. .~. ~ ~. ~
. ~: . ,.. ~ .~.,; : ,..., .. ..,., .~., . ~..: .~:'~ -.~ .'.'~'· ' ,~ ,. . ' ,:'~ ~ ~.-~- ~_ "~ '~ .( ' ~ ~ [ _ L .... ~.~
~.. , ; ,. .-~ , · ,.~. .~ .' , ...~ ~ .'c ~ .... .~ ' . .. , . ~ . ~ ,
',: ~m=' :~'-~'F-~='? ..... t~=:'' "r=':'"r-=~'~'~== '~'~?:r"~:'"'.'"-=; ?.-;.: ~q~"-~d"~q--~"~' ........ ~'~-"~q~-'-"~ .... ~' · r ~ , · ,
· ''~ :- ~ " ; '
~ '.~ "'.!, .':~ ;~'}."~', .... ~';:"",' ',:~' : ' ",;"' ~: '.[ ",:-~'~, ' -" ' ~' ,' .' ~ - '[' ~ ~ ',
~_.:......_~:
L '..~.....:...'...2~
~..._..~..~
~.x.L..
· .: ~ · ~ ,~*. : ~ ~ ~ ~ ', ~ . : J
........ ~' " ' ......' '~' ' " ' .... .i:';'~.. ': "
.~'..'. c...:t. ,.:~. .-'F. ~.. i', . :''.:..~.'." :..( ....'..~ - .~.'
4050 ~ -3950 -3~ -~-38~ -37~ -37~ -3650 -36~ -3550 -3~-~50 -~ -33~ -33~ -32~ -32~ -31 ~-31~ -~ -3~ -29~ -2~ -2850 -28~-27~ -27~ -26~ -2~ -25~ -2~ -24~ -24~-2350 -23~ -~ -~ -2150
Ve~ic~l Section at ~0~,00' [~Oft/in]
3/29/2001 1:34 ~M
2 3/8" CT ~ I
I 10,000 psi
SLB/Nordic
CT Drilling & Completion BOP
7 1/16" ,
Pipe/Slip ~ 2 3/8"
~~_ _~_ - L~~
Pipe/Slips ~~ 2 3/8"
SWAB OR MASTER VALVE
I
DATE I t CHECK NO.
H 184351
VENDOR ALASAAOILA
i DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
012901 CKOi290iL 100. O0 100
PYMT :-OMMENTS: Per,nit To D~iti tee
HANDLING INST: S/H- Te~ei Hubb[e X4628
THE A~ACHED CHECK IS IN PAYME~ FOR ~US DE~RIBED ABOVE. ~e]fil~ ~ 1 OO. OO 100
BP EXPLORATION (ALASKA)?. INC.
· P.O. BOX. 196612 '"":"~:'~:
ANCHORAGE, ALASKA. 99519-6612 ......
Fi!~IST NATIo,.N'~L BANK :OF ASHLAND
' '..":; : ':' .:AN:AFI~LIATE. _...o~ ~: '
":.:?!:i. ::..:.. NA3:ION,~L:~ITY.BA.NK :'::
:::' ':: ,'};;. ': .i'.i:'::Ii,:5~:38~9 ::. :'~ 'iI~:: : :;: I
412
No. H 18zt3
CoNsOuD^:rED COMMERCIAL ACC
'00184351
PAY
TO The
ORDER
0~
..
ONE .HUNDRED.:. & ,,..,.oO./1.***************************************** .US. DOLLAR
'" i ;:: .... .:,..::" '":,.::'i,."'.!':!:,:"" DATE '.:":'"?..: '":..' ":,' :' AMOUNT
"[ O2/21/O1 ] t $1OO. O
ALASKA O I L AND OAS:':, · :;? .'.:::ii; .... : :.".....',.::::. ...... :::.:...:.:.. NOT:";VALID. AFTER 120 DAYS
333 WEST 7TH AVENUE"." SUITE'i:?,IO0 '?,,,, .... ".~ ,/"
,.::,j,,,:,:, ,.,, 5 ,'.
ANCHORAGE
m'-Om.,
WELL PERMIT CHECKLIST COMPANY ./~',~ WELL HAME'al'
·
FIELD & POOL ~' .~-~,,'3,)._~' ,~ INIT CLASS ,~,_)~,,'/-.,.¥"~// (~"E, QL AREA
ADMINISTRATION 1. Permit fee attached ....................... Y ~1
2. Lease number appropriate ................... Y .~1
3. Unique well name and number .................. Y
N
4. Well located in a defined pool .................. Y N
5. Well located proper distance from drilling unit boundary .... Y N
6. Well located proper distance from other wells .......... t Y N
7. Sufficient acreage available in drilling unit ............I Y N
8. If deviated, is wellbore plat included ............... Y .N
9. Operator only affected party .................... Y N
10. Operator has appropriate bond in force ............. Y N
11. Permit can be issued without conservation order ........ , Y N
~ ,?/D/~,,~,,5 12. Permit can be issued without administrative approval ...... ~/'N
_ ...- / 13. Can permit be approved before 15-day wait ........... N
ENGINEERING 14. Conductor string provided ................... N~,)
15. Surface casing protects all known USDWs ........... Y
16. CMT vol adequate to circulate on conductor & surf csg ..... Y
17. CMT vol adequate to tie-in long string to surf csg ........ Y
18. CMT will cover all known productive horizons .......... {~ N
19. Casing designs adequate for C, T, B & permafrost .......~ N .
20. Adequate tankage or reserve pit ................. N
21. If a re-drill, has a 10-403 for abandonment been approved... N
22. Adequate wellbore separation proposed ............. N
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................ N
~ DATE 26. BOPE press rating appropriate; test to '~, 5'~Or,..% psig.
. · .......
c~l~'h 27. Choke manifold complies w/APl RP-53 (May 8'~,)
' 28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable ................. -~'~,,~ rt.,. o(',,,~-'~,
GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .....~N ~ Y' "~' ~ ¢
31. Data presented on potential overpressure zones ........
32. Seismic analysis of shallow gas zones .............
~~"'~A"'PJ::'R _D~TE~/ 33. Seabed condition survey (if off-shore) ............. //Y N /
34. Contact name/phone for weekly progress reports [exploratoryo~y] Y N
ANNULAR DISPOSAL35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zonei ....... Y N
APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N
to surface;
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N . ,//'"
pool; and ~~-.~'
. (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular COMMISSION: Comments/Instructions:
O
Z
O
rtl
Z
-I
-I-
c:\msoffice\wordian\diana\checklist (rev. 11/01//00)
Well History File
.APPENDIX
Information of detailed nature that is not
particularly germane to the Well permitting Process
but is part of the history file,
To improve the readability of the Well History file and to
simplify finding information, information, of this.
,nature is accumulated at the end of the file under APPE'.NDIXi
..
No'special'effort has been made to chronologically
organize this category of information,
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Thu Dec 13 16:03:29 2001
Reel Header
Service name ............. LISTPE
Date ..................... 01/12/13
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 01/12/13
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-10156
B. JAHN
SARBER/WHITL
G-25A PB2
500292165271
BP Exploration (Alaska) Inc.
Sperry Sun
13-DEC-01
MWD RUN 3
AK-MW-10156
B. JAHN
SARBER/WHITL
MWD RUN 4
AK-MW-10156
B. JAHN
SARBER/WHITL
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 5
AK-MW-10156
B. JAHN
SARBER/WHITL
MWD RUN 7
AK-MW-10156
B. JAHN
SARBER/GOODR
MWD RUN 8
AK-MW-10156
B. JAHN
GOODRICH/SEV
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
MWD RUN 11
AK-MW-10156
B. JAHN
GOODRICH/SEV
12
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
lin
13E
2617
1973
72.40
.00
.00
#
REMARKS:
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
3.750 5.500 10168.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL TRUE VERTICAL DEPTHS ARE SUBSEA TRUE VERTICAL
DEPTHS (TVDSS).
3. G-25A PB1 WAS AN INADVERTENT OPENHOLE SIDETRACK
DURING RUN 6.
G-25A PB2 WAS PLUGGED AND ABANDONED AFTER
ENCOUNTERING POOR
GEOLOGY AND LEAVING A FISH IN THE HOLE ON RUN 11.
G-25A WAS
COMPLETED ON RUN 16.
4. MWD RUNS 1, 4, 5, 7, AND 8 ARE DIRECTIONAL WITH
NATURAL GAMMA
PROBE (NGP) UTILIZING SCINTILLATION DETECTORS.
5. MWD RUNS 3 AND 11 ARE DIRECTIONAL WITH DUAL GAMMA
RAY (DGR)
UTILIZING GEIGER-MULLER DETECTORS.
6. DIGITAL DATA SHIFTED TO THE G-25A SCHLUMBERGER
MCNL/GR OF
5/27/2001 PER THE E-MAIL OF 8/27/2001 FROM D.
SCHNOOR OF BP
EXPLORATION (ALASKA) INC.
7. MWD RUNS 1, 3, 4, 5, 7, 8, AND 11 REPRESENT THE MWD
DATA FOR
WELL G-25A PB2 WITH API% 50-029-21652-71. THIS
WELL REACHED
A TOTAL DEPTH (TD) OF 12430' MD, 8891.2' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY - SCINTILLATION DETECTORS
SGRC = SMOOTHED GAMMA RAY - GEIGER-MULLER DETECTORS
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
#
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 10151.0 12400.5
ROP 10178.0 12430.5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
10173 0
10176 5
10179 0
10244 0
10264 5
10297 5
10327 5
10340 0
10346 0
12430 5
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
GR
10177.0
10180 5
10183 0
10247 5
10269 0
10302 5
10332 0
10344 0
10350 0
12434 5
BIT RUN NO MERGE TOP
1
3
4
5
7
8
11
MERGED MAIN PASS.
$
EQUIVALENT UNSHIFTED DEPTH
Data Format Specification Record
10149 5
10244 0
10268 0
10381 0
10628 5
10850 0
11710 5
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
MERGE BASE
10243 5
10267 5
10380 5
10628 0
10849 5
11710 0
12434 5
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FPH 4 1 68 4 2
GR MWD API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10151 12430.5 11290.8 4560
ROP MWD FPH 0.26 530.17 71.9405 4506
GR MWD API 13.76 597.59 63.4512 4500
First
Reading
10151
10178
10151
Last
Reading
12430.5
12430.5
12400.5
First Reading For Entire File .......... 10151
Last Reading For Entire File ........... 12430.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10149.5 10212.5
ROP 10182.0 10243.5
$
LOG HEADER DATA
DATE LOGGED: il-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S):
MUD PH:
MUD CHLORIDES PPM):
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type .... .0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
10244.0
35.4
35.4
TOOL NUMBER
PB02100HWRG6
3.750
Flo-Pro
8.70
49.0
9.0
44000
7.0
.000
.000
,000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FPH 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
.0
141.7
.0
.0
First Last
Name Service Unit Min Max
DEPT FT 10149.5 10243.5
ROP MWD010 FPH 4.24 137.47
GR MWD010 API 15.65 597.59
Mean Nsam Reading Reading
10196.5 189 10149.5 10243.5
82.1808 124 10182 10243.5
30.5748 127 10149.5 10212.5
First Reading For Entire File .......... 10149.5
Last Reading For Entire File ........... 10243.5
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10215.5 10237.5
ROP 10244.0 10267.5
$
LOG HEADER DATA
DATE LOGGED: 12-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 10268.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 35.0
MAXIMUM ANGLE: 44.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
TOOL NUMBER
PB02100HWRG6
3.750
Flo Pro
8.70
49.0
9.0
44000
7.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FPH 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
.0
141.4
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 10215.5 10267.5 10241.5 105
ROP MWD030 FPH 0.26 93.98 36.2206 48
GR MWD030 API 18.75 29.78 23.7393 45
First
Reading
10215.5
10244
10215.5
Last
Reading
10267.5
10267.5
10237.5
First Reading For Entire File .......... 10215.5
Last Reading For Entire File ........... 10267.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10232.0 10344.5
ROP 10268.0 10380.5
$
LOG HEADER DATA
DATE LOGGED: 12-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 10381.0
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL {FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 48.4
MAXIMUM ANGLE: 54.4
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
TOOL NUMBER
PB02100HWRG6
3.750
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Flo-Pro
8.70
54.0
8.8
38000
7.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FPH 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
.0
141.7
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 10232 10380.5 10306.3 298
ROP MWD040 FPH 0.46 76.23 38.7247 226
GR MWD040 API 14.03 60.07 22.4867 226
First
Reading
10232
10268
10232
Last
Reading
10380.5
10380.5
10344.5
First Reading For Entire File .......... 10232
Last Reading For Entire File ........... 10380.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
'Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10345.0
ROP 10381.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10603.0
10628.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3}:
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
13-MAY-01
Insite
66.16
Memory
10789.0
62.7
88.4
TOOL NUMBER
PB02100HWRG6
3.750
Flo-Pro
8.70
54.0
8.8
38000
7.0
.000
.000
.0
145.9
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FPH 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 10345 10628 10486.5 567
ROP MWD050 FPH 2.21 183.49 90.0721 495
GR MWD050 API 13.76 221.64 53.9654 517
First
Reading
10345
10381
10345
Last
Reading
10628
10628
10603
First Reading For Entire File .......... 10345
Last Reading For Entire File ........... 10628
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10603.5
ROP 10628.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10818.5
10849.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE {IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
16-MAY-01
Insite
66.16
Memory
10850.0
70.4
85.6
TOOL NUMBER
PB02100HWRG6
3.750
Flo-Pro
8.75
57.0
8.9
33000
5.8
.000
.000
.000
.000
.0
145.9
.0
.0
EWR FREQUENCY (HZ) :
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FPH 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10603.5 10849.5 10726.5 493
ROP MWD070 FPH 1.94 118.06 59.6064 443
GR MWD070 API 28.83 194.77 80.7494 431
First
Reading
10603.5
10628.5
10603.5
Last
Reading
10849.5
10849.5
10818.5
First Reading For Entire File .......... 10603.5
Last Reading For Entire File ........... 10849.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 8
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10819.0
ROP 10850.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11680.0
11710.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BlT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
17-MAY-01
Insite
66.16
Memory
11700.0
85.6
94.9
TOOL NUMBER
PB02100HWRG6
3.750
FLOPRO
8.65
.0
8.5
18O00
6.4
.000
.000
.000
.000
.0
150.1
.0
.0
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD080 FPH 4 1 68 4 2
GR MWD080 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10819 11710 11264.5 1783
ROP MWD080 FPH 0.55 402.14 65.9276 1721
GR MWD080 API 33.71 225.64 69.3836 1723
First
Reading
10819
10850
10819
Last
Reading
11710
11710
11680
First Reading For Entire File .......... 10819
Last Reading For Entire File ........... 11710
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11680.5 12404.5
ROP 11710.5 12434.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (SI:
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
21-MAY-01
Insite
66.16
Memory
12434.0
89.1
96.7
TOOL NUMBER
PB02100HWRG6
3.750
Flo-Pro
8.70
.0
8.5
30000
5.8
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
.0
155.9
.0
.0
DEPT FT 4 1 68
ROP MWDll0 FPH 4 1 68
GR MWDll0 API 4 1 68
Name Service Unit Min Max
DEPT FT 11680.5 12434.5
ROP MWDll0 FPH 1.26 530.17
GR MWDll0 API 25.01 143.13
Mean
12057.5
82.12
64. 6319
First Last
Nsam Reading Reading
1509 11680.5 12434.5
1449 11710.5 12434.5
1449 11680.5 12404.5
First Reading For Entire File .......... 11680.5
Last Reading For Entire File ........... 12434.5
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 01/12/13
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 01/12/13
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific Technical Services
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Wed Dec 12 09:58:15 2001
Reel Header
Service name ............. LISTPE
Date ..................... 01/12/12
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 01/12/12
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-10156
B. JAHN
SARBER/WHITL
G-25A
500292165201
BP Exploration (Alaska) Inc.
Sperry Sun
il-DEC-01
MWD RUN 3
AK-MW-10156
B. JAHN
SARBER/WHITL
MWD RUN 4
AK-MW-10156
B. JAHN
SARBER/WHITL
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 13
AK-MW-10156
S. LATZ
SEVCIK/FEKET
MWD RUN 14
AK-MW-10156
S. LATZ
SEVCIK/FEKET
MWD RUN 15
AK-MW-10156
S. LATZ
SEVCIK/FEKET
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
MWD RUN 16
AK-MW-10156
S. LATZ
SEVCIK/FEKET
12
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
lin
13E
2617
1973
72.40
.00
.00
#
REMARKS:
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
3.750 5.500 10168.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL TRUE VERTICAL DEPTHS ARE SUBSEA TRUE VERTICAL
DEPTHS (TVDSS).
3. G-25A PB1 WAS AN INADVERTENT OPENHOLE SIDETRACK
DURING RUN 6.
G-25A PB2 WAS PLUGGED AND ABANDONED AFTER
ENCOUNTERING POOR
GEOLOGY AND LEAVING A FISH IN THE HOLE ON RUN 11.
4. G-25A KICKS OFF FROM G-25 PB1 AT CEMENT PLUG SET
AT 10350' MD, 8775' TVD.
5. MWD RUNS 1, 4, 13, 14, 15, 16 ARE DIRECTIONAL WITH
NATURAL GAMMA
PROBE (NGP) UTILIZING SCINTILLATION DETECTORS.
6. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING
GEIGER-MULLER DETECTORS.
7. DIGITAL DATA SHIFTED TO THE SCHLUMBERGER MCNL/GR OF
5/27/2001
PER THE E-MAIL OF 8/27/2001 FROM D. SCHNOOR OF BP
EXPLORATION
(ALASKA) INC.
8. MWD RUNS 1, 3, 4, 13, 14, 15, 16 REPRESENT THE MWD
DATA FOR
WELL G-25A WITH API# 50-029-21652-01. THIS WELL
REACHED A
TOTAL DEPTH (TD) OF 12380' MD, 8877' TVD.
File Header
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY - SCINTILLATION DETECTORS
SGRC = SMOOTHED GAMMA RAY - GEIGER-MULLER DETECTORS
$
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves;
DEPTH INCREMENT: .5000
#
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 10145.5
ROP 10178.0
$
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELI
10173.
10176
10179
10244
10264
10297
10327
10340
10417
10462
10494
10503
10537
10542
10545
10570
10583
10603
10619
10659
10750
10803
10824
10833
10845
10866
10895
10954
10963
10974
11003
11062
11078
11123
11202
11285
NE DEPTH GR
0 10177
5 10180
0 10183
0 10247
5 10269
5 10302
5 10332
0 10344
0 10421
5 10467
5 10499
0 10506
5 10543
0 10547
5 10551
0 10576
0 10589
5 10609
0 10624
0 10664
0 10757
0 10810
5 10831
5 10839
5 10852
0 10872
5 10902
5 10961
0 10970
5 10981
5 11009
5 11068
0 11084
0 11130
5 11209
0 11292
all
EQUIVALENT
bit runs merged.
STOP DEPTH
12349.5
12380.5
UNSHIFTED DEPTH
11299.5
11384.5
11408 5
11457 5
11529 0
11543 0
11566 0
11572 5
11581 0
11586 0
11637 0
11671 0
11687 0
11707 0
11772 0
11781 5
11823 0
11833 5
11846 5
11852 0
11871 5
11893 0
11902 0
11962 5
11972 0
11987 5
12007 5
12013 5
12029 5
12034 5
12066 5
12169 5
12176 5
12239 0
12277 5
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
MWD
$
#
REMARKS:
11306.5
11392 5
11416 5
11464 0
11535 0
11549 0
11574 0
11583 0
11589 5
11595 0
11646 0
11689 5
11701 0
11717 0
11778 5
11788 5
11829 0
11839 0
11852 5
11860 5
11879 5
11900 5
11910 0
11969 5
11977 0
11993 0
12013 0
12018 0
12032 0
12038 5
12070 0
12177 0
12185 0
12248 5
12288 0
BIT RUN NO MERGE TOP
10182 0
10244 0
10268 0
10350 5
10657 0
11416 5
11978 5
1
3
4
13
14
15
16
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
MERGE BASE
10243 5
10267 5
10350 0
10656 5
11416 0
11978 0
12391 0
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10145.5 12380.5 11263 4471
ROP MWD FT/H 0.3 1118.05 100.599 4406
GR MWD API 14.03 597.59 53.8106 4409
First
Reading
10145.5
10178
10145.5
Last
Reading
12380.5
12380.5
12349.5
First Reading For Entire File .......... 10145.5
Last Reading For Entire File ........... 12380.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10149.5 10212.5
ROP 10182.0 10243.5
$
#
LOG HEADER DATA
DATE LOGGED: il-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Memory
10244.0
35.4
35.4
TOOL NUMBER
PB02100HWRG6
3.750
Flo-Pro
8.70
49.0
9.0
44000
7.0
.000
.000
.000
.000
.0
141.7
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
Name Service Unit Min Max
DEPT FT 10149.5 10243.5
ROP MWD010 FT/H 4.24 137.47
GR MWD010 API 15.65 597.59
Mean Nsam
10196.5 189
82.2184 124
30.5748 127
First
Reading
10149.5
10182
10149.5
Last
Reading
10243.5
10243.5
10212.5
First Reading For Entire File .......... 10149.5
Last Reading For Entire File ........... 10243.5
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10213.0 10237.5
ROP 10244.0 10267.5
$
LOG HEADER DATA
DATE LOGGED: 12-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT) : 10268.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 35.0
MAXIMUM ANGLE: 44.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G/:
MUD VISCOSITY (SI:
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
TOOL NUMBER
PB02100HWRG6
3.750
Flo Pro
8.70
49.0
9.0
44000
7.0
.000
.000
.000
.000
.0
141.4
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10213 10267.5 10240.3 110
ROP MWD030 FT/H 0.3 93.98 37.1329 48
GR MWD030 API 15.53 29.78 23.2802 50
First
Reading
10213
10244
10213
Last
Reading
10267.5
10267.5
10237.5
First Reading For Entire File .......... 10213
Last Reading For Entire File ........... 10267.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10238.0 10344.5
ROP 10268.0 10350.0
$
#
LOG HEADER DATA
DATE LOGGED: 12-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 10350.0
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 48.4
MAXIMUM ANGLE: 54.4
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
TOOL NUMBER
PB02100HWRG6
3.750
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Flo-Pro
8.70
54.0
8.8
38000
7.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
.0
141.7
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 10238 10350 10294 225
ROP MWD040 FT/H 0.46 76.23 33.3158 165
GR MWD040 API 14.03 60.07 22.6349 214
First
Reading
10238
10268
10238
Last
Reading
10350
10350
10344.5
First Reading For Entire File .......... 10238
Last Reading For Entire File ........... 10350
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 13
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10345.0
ROP 10350.5
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10626.5
10656.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S):
MUD PH:
MUD CHLORIDES PPM):
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
23-MAY-01
Insite
66.16
Memory
10650.0
60.5
87.8
TOOL NUMBER
PB02100HWRG6
3.750
Flo Pro
8.70
65.0
12.5
31000
5.8
.000
.0
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.000
146.0
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD130 FT/H 4 1 68 4 2
GR MWD130 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10345 10656.5 10500.8 624
ROP MWD130 FT/H 0.77 131.47 79.0296 613
GR MWD130 API 17.4 142.39 31.2221 564
First
Reading
10345
10350.5
10345
Last
Reading
10656.5
10656.5
10626.5
First Reading For Entire File .......... 10345
Last Reading For Entire File ........... 10656.5
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 14
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10627.0
ROP 10657.0
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11385.0
11416.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
24-MAY-01
Insite
66.16
Memory
11416.0
73.5
93.1
TOOL NUMBER
PB02100HWRG6
3.750
Flo Pro
9.00
65.0
9.0
24000
9.2
.000
.000
.000
.000
.0
154.0
.0
.0
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD140 FT/H 4 1 68 4 2
GR MWD140 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10627 11416 11021.5 1579
ROP MWD140 FT/H 1.59 916.79 113.471 1519
GR MWD140 API 17.4 191.16 63.4433 1517
First
Reading
10627
10657
10627
Last
Reading
11416
11416
11385
First Reading For Entire File .......... 10627
Last Reading For Entire File ........... 11416
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 15
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11385.5
ROP 11416.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
11948.5
11978.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
25-MAY-01
Insite
66.16
Memory
11978.0
84.2
93.0
TOOL NUMBER
PB02100HWRG6
3.750
Flo Pro
8.50
65.0
8.5
26000
5.8
.000
.000
.000
.000
.0
158.0
.0
.0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD150 FT/H 4 1 68 4 2
GR MWD150 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 11385.5 11978 11681.8 1186
ROP MWD150 FT/H 3.01 1118.05 112.671 1124
GR MWD150 API 27.18 156.47 61.8597 1127
First
Reading
11385.5
11416.5
11385.5
Last
Reading
11978
11978
11948.5
First Reading For Entire File .......... 11385.5
Last Reading For Entire File ........... 11978
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 16
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11949.0 12360.0
ROP 11978.5 12391.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION {DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S):
MUD PH:
MUD CHLORIDES PPM):
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
26-MAY-01
Insite
66.16
Memory
12391.0
91.7
96.0
TOOL NUMBER
PB02100HWRG6
3.750
Flo Pro
8.60
65.0
9.5
15600
5.4
.000
.000
.000
.000
.0
160.0
.0
.0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD160 FT/H 4 1 68
GR MWD160 API 4 1 68
Code
Offset
0
4
8
Channel
1
2
3
Name Service Unit Min Max
DEPT FT 11949 12391
ROP MWD160 FT/H 3.18 462.96
GR MWD160 API 26.59 106.21
Mean
12170
97.4761
53.8257
Nsam
885
826
823
First
Reading
11949
11978.5
11949
Last
Reading
12391
12391
12360
First Reading For Entire File .......... 11949
Last Reading For Entire File ........... 12391
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 01/12/12
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 01/12/12
Origin ........... ........ STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific
Scientific
Technical Services
Technical Services
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Thu Dec 13 14:45:40 2001
Reel Header
Service name ............. LISTPE
Date ..................... 01/12/13
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 01/12/13
Origin ................... STS
Tape Name ........ , ........ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-10156
B. JAHN
SARBER/WHITL
G-25A PB1
500292165270
BP Exploration (Alaska) Inc.
Sperry Sun
13-DEC-01
MWD RUN 3
AK-MW-10156
B. JAHN
SARBER/WHITL
MWD RUN 4
AK-MW-10156
B. JAHN
SARBER/WHITL
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
MWD RUN 5
AK-MW-10156
B. JAHN
SARBER/WHITL
MWD RUN 6
AK-MW-10156
B. JAHN
SARBER/WHITL
12
lin
13E
2617
1973
R, ,.CEiVED
DEC 2 8 2001
Alaska Oi~ & Gas Co~s. Co~m~issior,
.Anckera,qe
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
OPEN HOLE
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
72.40
.00
.00
CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (PT)
3.750 5.500 10168.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ALL TRUE VERTICAL DEPTHS ARE SUBSEA TRUE VERTICAL
DEPTHS (TVDSS).
3. G-25A PB1 WAS AN INADVERTENT OPENHOLE SIDETRACK
DURING RUN 6.
G-25A PB2 WAS PLUGGED AND ABANDONED AFTER
ENCOUNTERING POOR
GEOLOGY AND LEAVING A FISH IN THE HOLE ON RUN 11.
G-25A WAS
COMPLETED ON RUN 16.
4. MWD RUNS 1, 4, AND 5 ARE DIRECTIONAL WITH NATURAL
GAMMA
PROBE (NGP) UTILIZING SCINTILLATION DETECTORS.
5. MWD RUNS 3 AND 6 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR)
UTILIZING GEIGER-MULLER DETECTORS.
6. DIGITAL DATA SHIFTED TO THE G-25A SCHLUMBERGER
MCNL/GR OF
5/27/2001 PER THE E-MAIL OF 8/27/2001 FROM D.
SCHNOOR OF BP
EXPLORATION (ALASKA) INC.
7. MWD RUNS 1, 3, 4, 5, AND 6 REPRESENT THE MWD DATA
FOR WELL
G-25A PB1 WITH API% 50-029-21652-70. THIS WELL
REACHED A
TOTAL DEPTH (TD) OF 11448' MD, 8924.3' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY - SCINTILLATION DETECTORS
SGRC = SMOOTHED GAMMA RAY - GEIGER-MULLER DETECTORS
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
#
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 10145.5 11419.0
ROP 10178.0 11448.5
$
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
10173 0
10176 5
10179 0
10244 0
10264 5
10297 5
10327 5
10340 0
10346 0
11448 5
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
#
REMARKS:
GR
10177 0
10180 5
10183 0
10247 5
10269 0
10302 5
10332 0
10344 0
10350 0
11452 5
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 10149.5 10243.5
3 10244.0 10267.5
4 10268.0 10380.5
5 10381.0 10789.0
6 10789.5 11452.5
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record. ~ Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FPH 4 1 68 4 2
GR MWD API 4 1 68 8 3
Name Service Unit Min Max
DE?T FT 10145.5 11448.5
ROP MWD FPH 0.26 448.44
GR MWD API 13.76 597.59
Mean
10797
70.5261
68.2716
Nsam
2607
2542
2548
First
Reading
10145.5
10178
10145.5
Last
Reading
11448.5
11448.5
11419
First Reading For Entire File .......... 10145.5
Last Reading For Entire File ........... 11448.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10149.5 10212.5
ROP 10182.0 10243.5
$
LOG HEADER DATA
DATE LOGGED: il-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 10244.0
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 35.4
MAXIMUM ANGLE: 35.4
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
TOOL NUMBER
PB02100HWRG6
3.750
Flo-Pro
8.70
49.0
9.0
44000
7.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FPH 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
.0
141.7
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 10149.5 10243.5 10196.5 189
ROP MWD010 FPH 4.24 137.47 82.1808 124
GR MWD010 API 15.65 597.59 30.5748 127
First
Reading
10149.5
10182
10149.5
Last
Reading
10243.5
10243.5
10212.5
First Reading For Entire File .......... 10149.5
Last Reading For Entire File ........... 10243.5
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10213.0 10237.5
ROP 10244 . 0 10267 . 5
$
#
LOG HEADER DATA
DATE LOGGED: 12-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 10268.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 35.0
MAXIMUM ANGLE: 44.2
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB02100HWRG6
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S):
MUD PH:
MUD CHLORIDES PPM):
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Flo Pro
8.70
49.0
9.0
44000
7.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FPH 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
.0
141.4
.0
.0
Name Service Unit Min Max Mean Nsam
DEPT FT 10213 10267.5 10240.3 110
ROP MWD030 FPH 0.26 93.98 37.1062 48
GR MWD030 API 15.53 29.78 23.2802 50
First
Reading
10213
10244
10213
Last
Reading
10267.5
10267.5
10237.5
First Reading For Entire File .......... 10213
Last Reading For Entire File ........... 10267.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10238.0
ROP 10268.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
10344.5
10380.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
12-MAY-01
Insite
66.16
Memory
10381.0
48.4
54.4
TOOL NUMBER
PB02100HWRG6
3.750
Flo-Pro
8.70
54.0
8.8
38000
7.0
.000
.0
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.000
141.7
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FPH 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10238 10380.5 10309.3 286
ROP MWD040 FPH 0.46 76.23 38.5282 226
GR MWD040 API 14.03 60.07 22.5853 214
First
Reading
10238
10268
10238
Last
Reading
10380.5
10380.5
10344.5
First Reading For Entire File .......... 10238
Last Reading For Entire File ........... 10380.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10345.0
ROP 10381.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
10752.5
10789.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
13-MAY-01
Insite
66.16
Memory
10789.0
62.7
88.4
TOOL NUMBER
PB02100HWRG6
3.750
Flo-Pro
8.70
54.0
8.8
38000
7.0
.000
,000
.000
,000
.0
145.9
.0
.0
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FPH 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
Name Service Unit Min Max Mean Nsam
DEPT FT 10345 10789 10567 889
ROP MWD050 FPH 0.5 183.49 78.3262 817
GR MWD050 API 13.76 221.64 59.2 816
First
Reading
10345
10381
10345
Last
Reading
10789
10789
10752.5
First Reading For Entire File .......... 10345
Last Reading For Entire File ........... 10789
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10753.0 11423.0
ROP 10789.5 11452.5
$
LOG HEADER DATA
DATE LOGGED: 15-MAY-01
SOFTWARE
SURFACE SOFTWARE VERSION: Insite
DOWNHOLE SOFTWARE VERSION: 66.16
DATA TYPE (MEMORY OR REAL-TIME): Memory
TD DRILLER (FT): 11452.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG
MINIMUM ANGLE: 83.6
MAXIMUM ANGLE: 90.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY PB02100HWRG6
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 3.750
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE: Flo-Pro
MUD DENSITY (LB/G): 8.70
MUD VISCOSITY (S): 50.0
MUD PH: 8.5
MUD CHLORIDES (PPM): 33000
FLUID LOSS (C3): 7.8
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000 .0
MUD AT MAX CIRCULATING TERMPERATURE: .000 141.1
MUD FILTRATE AT MT: .000 .0
MUD CAKE AT MT: .000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD060 FPH 4 1 68
GR MWD060 API 4 1 68
Code
Offset
0
4
8
Channel
1
2
3
Name Service Unit Min Max
DEPT FT 10753 11452.5
ROP MWD060 FPH 0.71 448.44
GR MWD060 API 32.91 489.05
First Last
Mean Nsam Reading Reading
11102.8 1400 10753 11452.5
71.1496 1327 10789.5 11452.5
86.3281 1341 10753 11423
First Reading For Entire File .......... 10753
Last Reading For Entire File ........... 11452.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 01/12/13
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 01/12/13
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 01/12/13
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific
Scientific
Technical Services
Technical Services
Physical EOF
Physical EOF
End Of LIS File