Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
201-099
• • bp BP Exploration (Alaska) Inc. 0 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 August 22, 2011 " **, , :w ? 5 r - ; t ? t; � UG / V a 10 20p Mr. Tom Maunder Oil and Gas Conservation Commission u1/ ' G88 C 333 West 7 Avenue '�nc eta vv ' Ssio Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB DS -02 a, 01 ©9q Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS- 02 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659- 5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) DS -02 Date: 07/21/2011 Vol. of Corrosion Initial top of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal 02-01B 1971400 500292044201 Sealed NA Sealed N/A NA NA 02 -02A 1971680 500292007401 5' NA 5' N/A 74.80 5/20/2011 02 -03B 2002170 500292007702 38' 11.0 4" 7/13/11 3.40 7/21/2011 02 -04A 1961580 500292006401 0.2 NA 0.2' N/A 1.70 4/27/2011 02 -05A 2030820 500292008101 4.5' NA 4.5' N/A 68.00 5/19/2011 02 -06B 2040850 500292008602 6' NA 6' N/A 20.40 6/2/2011 02 -07A 1981070 500292015401 Sealed NA Sealed N/A NA NA 02 -08B 1980950 500292015502 Sealed NA Sealed N/A NA NA 02 -09C 2071390 500292015303 Sealed NA Sealed N/A NA NA 02 -10B 2000640 500292016302 Sealed NA Sealed N/A NA NA 02 -11A 1981260 500292027301 Sealed NA Sealed N/A NA NA 02 -12B 2070580 500292027702 Sealed NA Sealed N/A NA NA 02 -13B 2012430 500292043302 Sealed NA Sealed N/A NA NA 02 -14A 2031250 500292044601 Sealed NA Sealed N/A NA NA 02 -15A 1960420 500292044701 Sealed NA Sealed N/A N/A NA 02 -16C 2070870 500292044803 Sealed NA Sealed N/A NA NA 02 -17B 2051300 500292045302 Sealed NA Sealed N/A NA NA 02 -18B 2061860 500292045402 Sealed NA Sealed N/A NA NA 02 -19 1811860 500292069300 Sealed NA Sealed N/A NA NA 02 -20 1820290 500292072100 Sealed NA Sealed N/A NA NA 02 -21A 2010990 500292078101 Sealed NA Sealed N/A NA NA 02 -22B 2100520 500292074002 Sealed NA Sealed N/A NA NA 02 -23A 2000530 500292079501 0.5 NA .5' N/A 5.10 5/19/2011 02 -24A 2040300 500292074401 0.5 NA .5' N/A 3.40 5/19/2011 02 -25A 2080910 500292076601 0.2 NA .2' N/A 0.85 5/19/2011 02 -26C 2050190 500292077403 0.2 NA .2' N/A 0.85 5/19/2011 02 -27A 1990930 500292199401 12.5' 8.5 3" 7/8/11 1.70 7/12/2011 02 -28A 2041640 500292201201 Sealed Sealed N/A NA NA 02 -29C 2040510 500292201103 65' Top Plate N/A NA NA 02 -30B 2001260 500292220202 Sealed NA NA N/A NA NA 02 -31A 1990150 500292222701 1.5' 1.5' N/A 11.05 5/18/2011 02 -326 2020230 500292220902 1.1' 1.1' N/A 5.10 5/19/2011 02 -336 2090450 500292221402 1' 1' N/A 8.50 6/1/2011 02 -346 2100290 500292223402 0.8' 0.8' N/A 5.10 5/18/2011 02 -356 2060020 500292222202 1.5' 1.5' N/A 10.20 6/1/2011 02 -36A 2100780 500292287701 19.6' 11.5 5" 7/8/11 2.55 7/12/2011 02 -37 1961750 500292271700 0.1 0.1 N/A 0.85 5/18/2011 02 -38 1961610 500292270800 1.5' 1.5' N/A 15.30 5/18/2011 02 -39A 1971100 500292272100 1.5' 1.5' N/A 11.90 5/18/2011 02 -40 2071620 500292337700 2.9' 2.9' N/A 25.5 5/18/2011 I • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1b. Well Class: 1 20AAC 25.105 2OAAC 25.110 : Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 5/1/2011 201 - 099 311 - 056 3. Address: 6. Date Spudded: 13. API Number. P.O. Box 196612, Anchorage, Alaska 99519 - 6612 06/03/2001 50 029 - 20781 - 01 - 00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number. Surface: 06/07/2001 PBU 02 -21A 2153' FNL, 5178' FEL, SEC. 36, T11 N, R14E, UM 8. KB (ft above MSL): 64' 15. Field / Pool(s): Top of Productive Horizon: 382' FNL, 1130' FEL, SEC. 01, T1ON, R14E, UM GL (ft above MSL): Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil P001 1536' FNL, 338' FEL, SEC. 01, T1ON, R14E, UM 10859' 8613' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 686884 y - 5949029 Zone- ASP4 12408' 9039' ADL 028308 & 028311 TPI: x- 691020 y- 5945623 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x - 691841 y - 5944490 Zone ASP4 N/A 18. Directional Survey: 0 Yes CI No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 MC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- DrilVLateral Top Window MD/TVD: MWD GR, MEM GR, RES 11309' 8940' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE Amami- CASING WT. PER FT. GRADE ToP BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H -40 Surface 80' Surface 80' 30' 520 sx Arcticset II 13 -3/8" 72# L -80 Surface 2537' Surface 2537' 17 -1/2" 220 sx Fondu. 400 sx Permafrost 'C' 9 -5/8" 47# L -80 / s00-95, Surface 10597' Surface, 8427' 12-1/4" 500 sx Class 'G' 7" 29# L -80 10317' 11309' 8223' 8940' 8 -1/2" 425 sx Class 'G' 3-1/2" x 2 -7/8" 9.2# / 6.16# L -80 10900' 12371' 8209' 9038' 3 -3/4" 82 sx LARC 24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 5-1/2",17#, L -80 x 10293' 10282' / 8197' 4 -1/2 ", 12.6#, L -80 10293' -10366 MD TVD MD TVD 10366' ,' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD)' AMOUNT AND KIND OF MATERIAL USED 10920' Set Bridge Plug 10900' Cut and Pull 3-1/2" Liner / 4. JUN f, 8 2011 10858' Set Whipstock 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period 9 Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (col R): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None EC !V A A\ `r, 5 . RBDMS MAY 2 5 . Z011E COiilillini0P Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Rl S 3 °O & CNN. Submit Original Only ,ncllsre 0 InlG/� �t � ^ /1 G 29_ GEOLOGIC MARKERS (List all formations and markiOncountered): 30. OAATION TESTS NAME MD TVD WelTested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. (From 02 -21) None Sadlerochit 10785' 8559' Top CGL 11058' 8757' Base CGL 11148' 8822' 02-21A 23SB / Zone 2B 11261' 8905' 21TS / Zone 2A 11380' 11341' HOT 11625' 9041' Formation at Total Depth (Name): 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoing is �trru�e and correct to the best of my knowledge. / Signed: Terrie Hubble '1 j�j' Y Lt Title: Drilling Technologist Date: �l PBU 02 - 21A 201 - 099 311 f By Na eMumber Terrie Hubble, 564 -4628 Well Number Permit No. / Approval No. &Ring = Cody Rymu1 564 -5452 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Altemating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval)_ Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain)_ Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box Submit detailed descxition and analytical laboratory information required by 20 AAC 25.071 Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • i 02 -21A, Well History (Pre Rig Sidetrack) Date Summary 3/11/2011 T /I /0= 200/500/0 Temp =SI MIT IA Passed to 3000 psi. MIT OA Passed to 2000 psi. (CTD prep) IA pressured up to 3000 psi with 6.3 bbls crude. IA lost 78 psi in first 15 minutes and 26 psi in second 15 minutes. For a total of 104 psi in 30 minutes. Bled pressure down. Pumped 3.2 bbls down OA to reach test pressure. 15 min OA lost 45 psi. 30 min OA lost 15 psi. Total Toss of 60 psi in 30 mins. Bled pressure back. DSO notified of well status. 3/20/2011 T/1/0=N/A/ 700/150, Temp =SI. PPPOT -T (PASS), pre CTD. PPPOT -T: Stung into test port (0 psi). Functioned LDS, all moved freely (3 "). Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 1000 psi in 5 seconds. Bled to 0 psi, torqued LDS to 450 lb/ft. Pressured void to 5000 psi, lost 0 psi in 15 min, lost 0 psi insecond 15 min (PASS). Bled void to 0 psi. 3/22/2011 WELL SHUT IN ON ARRIVAL. TAG TOP OF 5 -1/2" DSSSV W/ 4.50" G. RING @ 2173' SLM / 2198' MD. PULLED 5 -1/2" CA -DSSSV FROM 2173' SLM / 2198' MD. DRIFT W/ 2.80" CENT., 2.50" S. BAILER TO TD @ 11277' SLM. CIBP @ 11300' ELM. PERFS OPEN. (PLASTIC COATED TBG. /FORMATION SAND SAMPLE) 3/24/2011 WELL SHUT IN UPON ARRIVAL. INITIAL T /I /0 = 300/1180/220 PSI. SPOT EQUIPMENT AND PRESSURE TEST LUBRICATOR. 3/25/2011 LRS PUMPED 350 BBLS KCL FOLLOWED BY 60 BBLS DIESEL FREEZE PROTECT. SET HALIBURTON 3.5" COMPOSITE BRIDGE PLUG MIDDLE ELEMENT AT 10920'. PRESSURE TEST PLUG TO 1000 PSI FOR 30 MINUTES. LOST 0 PSI AFTER 30 MINUTE TEST. 3/26/2011 RIH WITH 2.75" JET POWERCUTTER. CUT 3.5" LINER AT 10900'. POSITIVE INDICATION AT SURFACE OF FIRE. FINAL T /I /0 = 0/700/0 PSI. JOB COMPLETE. 4/6/2011 T /I /0= 0/600/0 Conducted PJSM; Performed leak rate test on I/A valve (passed); Installed 3 -1/8" CIW FL valve onto existing I/A valve; P/T new connection against existing I/A gate valve to 300 psi /5000 psi (passed); Pre Nordic 2 4/6/2011 T /I /0= 0/600/0 Before leaving for job, confirmation was given by Field Support Supervisor that it was acceptable to use and cycle the Master valve. On location barriers were verified, tree cap was removed and lubricator /BPV were attached to the tree, lubricator was pressure tested -Low: 300 psi /pass High: 3500 /pass. Set 5 -1/8" FMC IS -A BPV #539 thru tree 1 -18" ext. used, tag @ 99 ", removed lubricator changed out tools, reattached lubricator, pressure tested lubricator -Low: 300 psi /pass High: 3500 psi /pass. Torqued studs on tree to specs(see log). Pulled BPV @ 100 ". Installed new 0 -ring on tree cap and attached cap to tree, pressure tested against Swab valve, Low: 300 psi /pass High: 3500 psi /pass. 4/14/2011 T /I /0= 0/600/0 Verified barriers, removed tree cap, attached lubricator/TTP, pressure tested lubricator Low: 300 psi /pass High: 3500 psi /pass, Set 5 -1/8" FMC TTP thru tree, 1 -18" ext. used, tag @ 102 ". Removed lubricator installed pulling tool, reattached lubricator, pressure tested lubricator 300/3500 - pass. Shell tested tree 300 psi /pass - 5000 psi /pass, Pulled TTP at same depth, installed new o -ring on tree cap, tested cap to 500 psi /pass. Pre - Nordic 2, no problems. JOB COMPLETE. 4/17/2011 T /I /0= SSV /620/3. Temp= SI. Bleed WHP's to — 0 psi (pre -CTD). Integral flange installed on IA. IA FL near surface. Bled IAP to slop trailer from 620 psi to 230 psi in 3 hrs. SI monitored for 30 min. IAP unchanged. Unable to bleed OAP due to time restraints. Final WHP's= SSV /230/3. Job incomplete. 4/18/2011 T /I /0= SSV /250/3. Temp= SI. Bleed WHP's to — 0 psi (Pre -CTD). Integral flange installed on IA. IA FL near surface. IAP increased 20 psi overnight. Bled IAP to slop tank from 250 psi to 3 psi in 7 hrs. SI monitor for 30 min. IAP unchanged. Bled OAP to slop tank from 3 psi to 0 psi in 5 min. SI monitor for 30 min. OAP increased 7 psi. Final WHP's= SSV /10/0. Job incomplete. Page 1 of 1 • • . . North America - ALASKA - BP . - : �e 1 eMS'' Operation S Report Common Well Name: 02 -21 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 4/26/2011 End Date: X3- 00YL4 -C (2,433,581.00 ) Project: Prudhoe Bay I Site: PB DS 02 Rig Name /No.: NORDIC 2 Spud Date/Time: 6/2/2001 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA 1 UWI: 500292078100 Active Datum: 47 : 21 4/13/1982 00:00 @64.00ft (above Mean Sea Level) Date From - To I Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (ft) 4/26/2011 15:00 - 19:00 4.00 MOB P PRE j MOVE RIG OFF OF WELL 2 -12C. 1 ' HOLD PJSM AND MOVE RIG TO PAD IN _ i FRONT OF WELL 2 -21 B. 119:00 - 00:00 1 5.00 1 MOB ! N WAIT PRE STANDBY FOR SRT TO ADDRESS LEAK • . BEHIND WELL 2 -21 B THAT WAS DISCOVERED 1 i BY WSL DURING PRE -RIG SITE INSPECTION. 1 I PERFORM LIGHT MAINTENANCE ON RIG. CONTINUE TO MOBILIZE EQUIPMENT FROM I AROUND 2 -12C TO PAD NEAR 2 -21 B. SLB RU INJECTOR FOR 2 -3/8" COIL SRT BEGIN THAWING GROUND AROUND WELLHEAD TO DELINIATE SPILL BOUNDARY. 4/27/2011 00:00 - 04:30 ! 4.50 1 MOB � N WAIT PRE STANDBY, FOR SRT TO ADDRESS LEAK BEHIND WELL 2 -21 B THAT WAS DISCOVERED 1 BY WSL DURING PRE -RIG SITE INSPECTION. I SIGN OFF WWT PERMIT FOR 2 -12C AND REMOVE LOCKS FROM WELLS THAT WERE LOCKED OUT FOR THAT WORK. CONTINUE TO MOBILIZE EQUIPMENT AREA NEAR 2 -21. _ SPOT SATELLITE CAMP. 04:30 - 05:15 0.75 MOB N WAIT j PRE I HOLD PJSM WITH SRT AND SUPERSUCKER ;DRIVER. DISCUSS THEIR OPERATION, PROPER PPE AND COMMUNICATION BETWEEN SRT AND RIG. SRT REMOVES -2 -YARDS OF DIESEL CONTAMINATED GRAVEL USING SUPER SUCKER AND DECLARES AREA CLEAN. ' 05:15 - 06:00 1 , 0.75 r MOB P PRE HOLD RIG EVACUATION DRILL WITH RIG CREW - NO EXTRA PERSONNEL ON 1 LOCATION. HOLD AAR ONCE CREW HAD MUSTERED - CREW RESPONDED QUICKLY AND COMPLETELY. 1 ALL WERE REMINDED THAT THE BEST WAY TO EXIT THE RIG FROM AN UPPER LEVEL IS TO EXIT THE RIG TO FRESH AIR FIRST AND THEN DESCEND TO THE GROUND. • I ' IT WAS NOTED THAT NO NOTIFICATION WAS 1 MADE TO THE RIG HARMONY HUB AS NO EXTRA PERSONNEL WERE ON LOCATION - I ALL PERSONNEL AGREED THAT A HARMONY 1 ANNOUNCEMENT SHOULD BE MADE • REGARDLESS OF EXTRA PERSONNEL ON LOCATION. 06:00 08:00 2.00 MOB P PRE PREP WELL FOR MOVING RIG OVER. LAY DOWN HANDI -BERM AND RIG MATS. 08:00 - 08:30 0.50 MOB 1 P PRE I PJSM FOR MOVING RIG OVER WELL. DISCUSS SPOTTER POSITIONS AND GO THROUGH RIG MOVE CHECKLIST. 08:30 - 14:50 6.33 MOB 1 P I PRE MOVE RIG OVER WELL AND SET RIG DOWN. ACCEPT RIG AT 1000 -HRS ON 4/27/2011. START RIGGING UP BOPS AND LUBRICATOR Printed 5/11/2011 10:26:03AM •orth America - ALASKA - BP Page 2 0#441 lir Operation Summary Report Common Well Name: 02 -21 AFE No Event Type: RE- ENTER- ONSHORE (RON) l Start Date: 4/26/2011 I End Date: (X3- 00YL4 -C (2,433,581.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NORDIC 2 Spud Date/Time: 6/2/2001 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA I UWI: 500292078100 Active Datum: 47 : 21 4/13/1982 00:00 ©64.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (ft) 14:50 - 15:10 i 0.33 MOB 1 P PRE RIG EVACUATION EXERCISE. ALL PERSONNEL MUSTER IN OFFICE TRAILER AND ARE ACCOUNTED FOR IN 2 MIN. NO EXTRA PERSONNEL ON LOCATION AT THE TIME OF THE DRILL. CONDUCT AAR AFTERWARDS AND j DOCUMENT LESSONS LEARNED. 15:10 - 15:30 0.33 MOB P PRE CONTINUE RIGGING UP LUBRICATOR 1 :SECTIONS. 15:30 - 17:55 i 2.42 MOB P 1 PRE PJSM FOR RIGGING UP STRIPPER TO ' INJECTOR. i INSTALL STRIPPER ON INJECTOR. i17:55 - 18:25 0.50 MOB P 1 PRE I PJSM FOR STABBING COILED TUBING INTO INJECTOR. I PULL TEST GRAPPLE. - GOOD TEST. 18:25 - 19:30 1.08 MOB P PRE I PJSM WITH INCOMING CREW. PULL COIL TO INJECTOR HEAD AND STAB _ I ' INTO INJECTOR. 19:30 - 21:15 1.75 MOB P I PRE : PJSM ON PREPPING COIL. CUT COIL UNTIL E LINE EXPOSED. INSTALL NEW ELINE BOOT AND DRESS COIL FOR 1 CONNECTOR. 1 SET INJECTOR BACK IN CIRCULATION HOLE. GREASE CREW SERVICE TREE. I WELLS SUPPORT RU HARDLINE AND TEST TO 4000 -PSI. GOOD TEST. 21:15 - 22:30 1.25 MOB P ! PRE PUMP 10 -BBLS OF MEOH FOLLOWED BY 18.4 -PPG 2% KCL TO FILL COIL. CIRCULATE AT 1 -BPM WITH 400 -PSI. DIVERT METHANOL RETURNS TO CUTTINGS 1 I BOX. REDUCE CIRCULATION RATE TO .4 -BPM 1 WITH 150 -PSI. 122:30 - 00:00 1.50 BOPSUR P PRE : PJSM ON FUNCTION & SHELL TESTING BOPE. ITAKE RKB MEASUREMENTS. FUNCTION TEST BOPE - NO ISSUE. L ILL BOP STACK WITH WATER. 4/28/2011 1 00:00 - 01:00 1.00 BOPSUR P PRE I FINISH FILLING BOP STACK WITH FRESH WATER. PERFORM SHELL TEST TO 250 -PSI LOW AND 1 3500 -PSI HIGH. I I HOLD AND CHART EACH TEST FOR 1 15- MINUTES. I GOOD TESTS. 101:00 - 08:30 ''1 7.50 BOPSUR P I PRE HOLD PJSM ON INITIAL BOPE TEST. O PERFORM INITIAL BOPE TEST. DC 1 1 ALL TESTS TO 250 -PSI LOW AND 3500 PSI HIGH. HOLD AND CHART EACH TEST FOR I 5- MINUTES. AOGCC REP CHUCK SCHEVE WAIVED STATE'S RIGHT TO WITNESS BOPE TEST AT I 1815 -HRS ON 4/27/2011. ALL TESTS WITNESSED BY BP WSL AND NORDIC TOOLPUSHER. 1 08:30 - 09:30 I 1.00 BOPSUR P PRE 1PT BAKER CHECK VALVES TO 250 / 2500 PSI AT SURFACE AND CHART, GOOD TEST. ' 1 FILL GAS BUSTER U -TUBE WITH FRESH WATER UNTIL WATER IS SEEN AT PITS TO VERIFY ITS CLEAR. Printed 5/11/2011 10:26:03AM "Forth America - ALASKA - BP 0 P 3 at ' . Operation Summary Report . Common Well Name: 02 -21 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 4/26/2011 End Date: X3- 00YL4 -C (2,433,581.00 ) Project: Prudhoe Bay I Site: PB DS 02 Rig Name /No.: NORDIC 2 I Spud Date/Time: 6/2/2001 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum: 47 : 21 4/13/1982 00:00 @64.00ft (above Mean Sea Level) Date From - To Hrs Task I Code NPT I NPT Depth Phase i Description of Operations (hr) 1 (ft) 09:30 - 11:00 ; 1.50 BOPSUR P PRE i PJSM FOR PT INNER REEL VALVE AND PACKOFF. ' PICK UP INJECTOR AND M/U CT CONNECTOR. I PULL TEST CT CONNECTOR TO 35K, PT TO , 250 / 3750 PSI, GOOD. 11:30 0.50 W .- - � 11:00 BOPSUR P PRE � M/U CT RISER TO WELL. TEST INNER REEL I VALVE AND CT STRIPPER TO 300 / 3500 PSI, . GOOD. 11:30 - 13:00 1.50 1 BOPSUR P PRE I DROP 3/4 DRIFT BALL AND PUMP IT I THROUGH REEL. 1 'I BALL IS HEARD ROLLING, LEAVES REEL HOUSE AT 57.8 BBLS. LIFT UP INJECTOR AND REMOVE NOZZLE, RECOVER 3/4" BALL. ' PUT INJECTOR BACK IN CIRC HOLE. :13:00 - 13:20 j 0.33 ' BOPSUR I P 1 WEXIT BPV CREW ARRIVES, SPOT TRAILER AND PREP TO BRING BPV LUBRICATOR ABOARD. 13:20 13:30 0.17 BOPSUR 1 P WEXIT I PJSM WITH BPV CREW TO DISCUSS PT AND BARRIER REQUIREMENTS. 1 13:30 - 17:00 3.50 ! BOPSUR P WEXIT LIFT BPV LUBRICATOR UP AND MIU TO CT RISER. PT TO 250 / 3500 PSI, GOOD. I j PULL BPV, NO PRESSURE UNDERNEATH. I CHECK TREE BOLTS FOR TORQUE, ALL ARE 1- — + — GOOD. 17:00 - 18:40 1.67 FISH P 1 - WEXIT MU BHA #1 FOR FISHING LINER. PU INJECTOR HEAD AND MU COIL TO BHA. STAB ON INJECTOR HEAD. 18:40 - 21:00 2.33 FISH P WEXIT HOLD PJSM ON RIH WITH BHA #1. RIH WITH BHA #1 AT 80 -FPM TO 10000'. CIRCULATE AT MIN RATE, DISPLACING I DIESEL FREEZE PROTECTION. 121:00 - 21:20 0.33 FISH P WEXIT WEIGHT CHECK AT 10000' WITH PIPE MOVING AT 20 -FPM. PU WT = 43K -LBS, SO WT = 22K -LBS CONTINUE TO RIH TO 10200'. / 21:20 - 23:30 2.17 FISH P WEXIT CIRCULATE 1.5X BU AT 2.5 -BPM WITH c� I 2500 -PSI. I FINAL 80 -BBLS PUMP 8.4 -PPG 2% KCL WITH I SAFE SURF O. OBTAIN SLOW PUMP RATES - PUMP 1: 1 -BPM 1= 420 -PSI, 2 -BPM = 1640 -PSI. PUMP 2: 1 -BPM , I = 430 -PSI, 2 -BPM = 1630 -PSI. ' I FLOW CHECK WELL - STATIC. 23:30 - 00:00 0.50 FISH P 1 WEXIT I CONTINUE TO RIH AT 10 -FPM CIRCULATING I AT .3 -BPM WITH 30 -PSI. TAG FISH AT 10322' UNCORRECTED. SHUT DOWN CIRCULATION. . PU TO 50K -LBS AND SEE WEIGHT BREAK I OVER. CONTINUE TO PULL UP HOLE AT I 150K-LBS. RBIH AND SET DOWN 2K -LBS I BRING PUMP BACK UP TO 2 -BPM WITH 1 ,1730 -PSI AND PUMP 35- ADDITIONAL BBLS OF I I 8.4 -PPG 2% KCL WITH SAFE SURF 0 (115 -BBLS TOTAL SOAP PUMPED) AND I CHASE WITH 8.4 -PPG 2% KCL. Printed 5/11/2011 10:26:03AM •orth America - ALASKA - BP Page 4 I Operation Summary Report ' — Common Well Name: 02 -21 _ AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 4/26/2011 End Date: X3- 00YL4 -C (2,433,581.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NORDIC 2 Spud Date/Time: 6/2/2001 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA 1 UWI: 500292078100 Active Datum: 47 : 21 4/13/1982 00:00 @64.00ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 4/29/2011 00:00 - 02:10 1 2.17 FISH P WEXIT I CONTINUE TO CIRCULATE 1.5X BU AT 2.4 -BPM WITH 2380 -PSI. TAKE SAFE SURF 0 RETURNS TO TIGER I TANK. 1 FLOW CHECK WELL - STATIC. 02:10 - 03:15 1.08 FISH P WEXIT POH WITH BHA #1 AND LINER FISHAT 35 -FPN4 1 FROM 10322' TO 9770'. CIRCULATE DOWN COIL AT .3 -BPM AND I I HOLD 200 -PSI BACK PRESSURE ON BACK ['SIDE. !TAG UP AT 9770' AND OVERPULL 5K -LBS. VARY PU SPEED, WELLHEAD PRESSURE AND PUMP RATE BUT CONTINUE TO HANG UP AT SAME DEPTH. ' 03:15 05:00 1.75 FISH P WEXIT DISCUSS SITUATION WITH CTD SUPERINTENDENT. DECISION MADE TO JAR LIGHTLY TO ATTEMPT TO PASS OBSTRUCTION. STAGE UP OVERPULLS FROM 7K -LBS TO 14K -LBS BUT JARS ARE NOT FIRING. FINAL PU TO 14K -LBS OVER, FISH PULLS i FREE AND THEN HANGS UP AT 9756'. ! SLACK OFF AND COCK JARS. PU TO 13K -LBS j OVERPULL AND JARS FIRE. PUMP PRESSURE BEGINS TO BUILD. BLEED PRESSURE OFF AND PU, GS SPEAR RELEASED. RBIH AND ENGAGE GS SPEAR WITH 2K -LBS DOWN AT 9765'. PU TO 13K -LBS OVERPULL AND JARS FIRE. FISH PULLS FREE AND PU WT IS 5K -LBS GREATER THAN TRIP IN THE WELL l 1 INDICATING FISH IS STILL LATCHED. 1 CONTINUE TO POH SLOWLY, HOLDING 1200 -PSI BACK PRESSURE TO 9500'. (FISH ABOVE 4-1/2" X 5-1/2" X0) FLOW CHECK WELL - STATIC. 05:00 - 08:00 3.00 FISH P WEXIT CONTINUE TO POH FROM 9500'. CIRCULATE AT MIN RATE DOWN COIL AND PUMP DOWN BACKSIDE HOLDING 200 -PSI _ BACK PRESSURE. 08:00 0.50 08:30 ! FISH P WEXIT TAG STRIPPER, FLOW CHECK WELL. PJSM FOR UD FISHING BHA AND FISH. 08:30 - 09:00 0.50 FISH P WEXIT I LIFT OFF INJECTOR AND SET IT ON LEGS. UD FISHING TOOLS. LINER IS RECOVERED. 109:00 - 12:00 3.00 FISH P WEXIT 1UD LINER THAT WAS FISHED OUT OF WELL. UD 18 FULL AND 1 PARTIAL JT (21.14') TOTAL PIPE FISHED IS 601.76' FT, INCLUDING DEPLOYMENT SLEEVE. !JET CUT FLARED TO 3.837" OD. 12:00 13:30 1.50 FISH P I WEXIT I FISHED PIPE IS TESTED FOR NORM, NONE FOUND. 1 OFFLOAD FISHED LINER AND FISHING TOOLS FROM RIG. 13:30 - 14:20 1 0.83 FISH P I WEXIT !M/U CT RISER, PUMP SLACK BACKWARDS. --- � - - - -- - 114:20 16:10 1.83 ; FISH P I- -- - - -j - - - -- -- -- - -- WEXIT M/U HYDRAULIC CUTTER, CUT OFF 232 FT OF 1 CT. NO CABLE FOUND. I PUMP CABLE FORWARD IN THE CIRC HOLE. ! PUMP OUT 34 FT OF CABLE WHICH LEAVES !TOO LITTLE SLACK, HAVE TO RE -PUMP ! I SLACK. Printed 5/11/2011 10:26:03AM • orth America - ALASKA BP Page 5 erg . Operation Summary Report Common Well Name: 02 -21 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 4/26/2011 End Date: X3- 00YL4 -C (2,433,581.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NORDIC 2 Spud Date/Time: 6/2/2001 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA I UWI: 500292078100 Active Datum: 47 : 21 4/13/1982 00:00 @64.00ft (above Mean Sea Level) Date 1 From - To Hrs Task Code NPT ; NPT Depth Phase Description of Operations 16:10 - 16:45 0.58 FISH P O WEXIT I CUT OFF EXCESS CABLE AND RE -BOOT. MU SLB CTC AND PULL TEST TO 40K -LBS. GOOD TEST. 16:45 - 18:50 2.08 EVAL P WEXIT HEAD UP BHI TOOLS 18:50 - 20:15 1.42 EVAL P WEXIT PRESSURE TEST CTC TO 250 -PSI AND 14000-PSI. SEE DRIP FROM COIL CONNECTOR ON HIGH TEST. !BLEED PRESSURE OFF, LD BHI TOOLS AND CUT CONNECTOR AND 1' OF COIL. DRESS COIL AND INSTALL DIMPLE CONNECTOR. PULL TEST CONNECTOR -GOOD TEST. 20:15 - 20:30 0.25 EVAL P t WEXIT REREAD BHI TOOLS AND PRESSURE TEST COIL CONNECTOR TO 250 -PSI AND 4000 -PSI. I GOOD TESTS. 20:30 - 22:00 1.50 EVAL P WEXIT i, PRESSURE TEST BHI CHECKS TO 250 -PSI LOW. SEEING SLIGHT BLEED -OFF BUT NO VISIBLE LEAKS. BLEED PRESSURE OFF AND CIRCULATE • ITHROUGH COIL. I WHEN CIRCULATION ESTABLISHED, SMALL WEEP OF FLUID SEEN AT TOP OF COIL CONNECTOR. WEEP STOPS AS CIRCULATING PRESSURE STABILIZES. REPEAT PROCESS SEVERAL TIMES WITH SIMILAR RESULTS. DISCUSS SITUATION WITH CTD SUPERINTENDENT AND DECIDE TO CUT COIL I AND INSTALL CONNECTOR AGAIN. 22:00 - 23:00 1.00 EVAL P WEXIT I LD BHI TOOLS AND CUT CONNECTOR AND 9' OF COIL. I DRESS COIL AND REINSTALL COIL CONNECTOR. TEST BETWEEN O -RINGS OF CONNECTOR TO 4000 -PSI. GOOD TEST. 23:00 - 23:45 0.75 EVAL P WEXIT REHEAD BHI TOOLS. 23:45 - 00:00 0.25 EVAL P WEXIT I PRESSURE TEST COIL CONNECTOR TO 250 -PSI / 4000 -PSI FOR 5 -MIN EACH. GOOD TESTS. 4/30/2011 00:00 01:15 1.25 EVAL P WEXIT PRESSURE TEST BHI CHECKS TO 250 -PSI 1 LOW AND 1500 -PSI HIGH. HOLD AND CHART EACH TEST FOR - 5- MINUTES. GOOD TESTS. 01:15 - 02:15 1.00 EVAL P WEXIT PJSM WITH RIG CREW ON MU PDS CALIPER I TOOL. MU PDS MEMORY CALIPER TOOLS TO BHI TOOLS BHA CONSISTS OF: PDS MEMORY CALIPER, I 1 XO, HOT, DGS, DPS, EDC, POWERCOMMS, 1 LQC, UQC AND XO. OAL = 73.43' 02:15 - 08:10 5.92 EVAL P 1 I WEXIT STAB ON INJECTOR. RIH WITH PDS MEMORY CALIPER AT 80 -FPM. CIRCULATE AT 1.5 -BPM WITH 725 -PSI THROUGH OPEN EDC. I I I WT CHECK AT 10000'. PU WT = 42K -LBS, SO WT = 22K -LBS. WAIT AT 10890 FT FOR THE CALIPER ARMS TO OPEN. Printed 5/11/2011 10:26:03AM America - ALASKA - BP Page 6 e •orth • Operation Summary Report Common Well Name: 02 -21 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 4/26/2011 ' End Date: X3- 00YL4 -C (2,433,581.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NORDIC 2 1 Spud Date/Time: 6/2/2001 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum: 47 : 21 4/13/1982 00:00 ©64.00ft (above Mean Sea Level) Date From - To Hrs Task 1 Code NPT I NPT Depth Phase Description of Operations (hr) I (ft) — 08:10 - 08:40 0.50 EVAL P WEXIT I START LOGGING UP FROM 10890 FT AT 35 FT /MIN. I 08:40 - 11:30 2.83 EVAL P WEXIT STOP AT 10000 FT AND ALLOW ARMS TO RETRACT. RECORD SLOW PUMP RATE PRESSURES WITH BOTH PUMPS AND POOH. _. 1 11:30 - 13:30 2.00 EVAL P WEXIT TAG STRIPPER, UD CALIPER BHA AND I , COFLTRAK. NO MISSING ARMS. I - _ - - - -- ___ ______ I DOWNLOAD DATA FROM CALIPER TOOL. 13:30 - 16:30 3.00 EVAL P I WEXIT SEND RAW DATA TO PDS IN HOUSTON TO GET PROCESSED. 16:30 - 17:30 1.00 EVAL P 1 WEXIT , PROCESSED DATA SHOWS ACCEPTABLE ID !ACROSS SETTING AREA. '' ' CALL BTT FOR GEN 2 WHIPSTOCK. 1 17:30 - 19:00 1.50 WHIP P WEXIT ',BRING WHIPSTOCK TO RIG FLOOR. ' HOLD PJSM WITH RIG CREW ON MU WHIPSTOCK. , MU WHIPSTOCK BHA. BHA CONSISTS OF: BAKER GEN II WHIPSTOCK WITH 2 -PIP TAGS INSTALLED, HYD SETTING TOOL, XO, HOT, DGS, DPS, 'EDC, P &C, WEAR SUB, LQC, UQC, XO AND , j • CTC. OAL = 80.85' 19:00 - 22:00 3.00 WHIP P WEXIT STAB ON INJECTOR HEAD & BLOW DOWN ' KILL LINE. OPEN EDC AND ESTABLISH CIRCULATION AT I I .25 -BPM WITH 40 -PSI. RIH WITH WHIPSTOCK TO 10775' AT 75 -FPM, SLOWING TO 25 -FPM THROUGH TUBING JEWELRY. HOLD TABLETOP KICK WHILE DRILLING DRILL WHILE RIH. REVIEW INDIVIDUAL 1 DUTIES OF RIG CREW AND DISCUSSED NECESSARY NOTIFICATIONS IN THE EVENT OF A WELL CONTROL INCIDENT. 22:00 - 22:30 0.50 WHIP P i WEXIT I LOG TIE IN PASS AT 10775' TO 10857' AT ' 2 -FPM. , APPLY -26' CORRECTION TO 10831' ' 1 PU WT = 45K -LBS, SO WT = 25K -LBS. 22:30 23:00 0.50 I WHIP P ? 1 WEXIT CONTINUE TO RIH TO POSITION BOTTOM OF WS AT 10875.5' / TOP OF WS AT 10858'. ORIENT WHIPSTOCK TO 0 -DEG. CLOSE EDC. PRESSURE UP TO SET WS AND SEE SHEAR AT 3000 -PSI. BLEED PRESSURE OFF AND SET DOWN _ _ _ 2K -LBS ON WS TO CONFIRM SET. 123:00 - 00:00 1.00 I WHIP P WEXIT ' POH WITH WS RUNNING BHA FROM 10858'. OPEN EDC AND CIRCULATE AT 1.15 -BPM -_ -__ WITH 470-PSI WHILE POH. 5/1/2011 I 00:00 - 01:00 1.00 WHIP P WEXIT CONTINUE TO POH WITH WHIPSTOCK RUNNING BHA. 01:00 - 01:20 j 0.33 I WHIP P WEXIT � HOLD PJSM ON HANDLING WHIPSTOCK I RUNNING BHA. UNSTAB INJECTOR HEAD AND SET BACK IN CIRC HOLE. , , LD WHIPSTOCK HANDLING TOOLS. I I I TOOLS INDICATE WHIPSTOCK SET - CORRECTLY Printed 5/11/2011 10:26:03AM ,orth America - ALASKA - BP Page 7 etztlt Operation Summary Report Common Well Name: 02 -21 - AFE No Event Type: RE- ENTER- ONSHORE (RON) ' Start Date: 4/26/2011 End Date: 1X 00YL4 -C (2,433,581.00 ) Project: Prudhoe Bay Site: PB DS 02 Rig Name /No.: NORDIC 2 � Spud Date/Time: 6/2/2001 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292078100 Active Datum: 47 : 21 4/13/1982 00:00 @64.00ft (above Mean Sea Level) Date From - To Hrs Task 1 Code NPT 1 NPT Depth Phase 1 Description of Operations (hr) (ft) 101:20 - 01:40 0.33 STWHIP P 1 WEXIT MU WINDOW MILLING BHA. 1 I I ' BHA CONSISTS OF: 3.8" DSM & REAMER, 2 -7/8" .6 -DEG MOTOR, HOT, DGS, DPS, DEC, P &C, WEAR SUB, LQC, UQC, AND XO. __ ; MU TO CTC AND STAB ON INJECTOR HEAD. 01:40 - 04:00 2.33 STWHIP P WEXIT I RIH WITH WINDOW MILLING BHA AT 90 -FPM TO 10775'. I :CIRCULATE AT .35 -BPM WITH 175 -PSI. 04:00 - 04:30 0.50 STWHIP P WEXIT 'TIE -IN TO GR FROM 10775' TO 10838' IAPPLY -26' CORRECTION. 1 RIH AT 5 -FPM TO LIGHTLY TAG WHIPSTOCK _ AT 10864.5'. W 04:30 - 06:30 2.00 STWHIP P L WEXIT OPEN EDC AND DISPLACE WELL TO 8.6 -PPG POWERPRO MUD AT 3 -BPM WITH 2500-PSI. W 06:30 - 08:30 2.00 , STWHIP P I WEXIT CONTINUE MUD SWAP, PUMP 3 BPM THROUGH OPEN EDC. 08:30 - 09:30 1.00 STWHIP • WEXIT FINAL MUD TRUCK ARRIVES, CLOSE EDC AND CAPTURE SLOW PUMP RATE 0.-/Me) , PRESSURES. 1 WT CHECK IS 45K AT 10850 FT. 1 TAG AT 10858.5 FT PUMPING. PICK UP TO 10855 FT AND START TIME MILLING, 0.1 FT / 2 MIN. ZERO DWOB. MAINTAIN OL TF AND 2.5 BPM THROUGHOUT THE MILLING. 9:00 10855.40 FT 2190 PSI 0.01K DWOB. STALL AT 10856.5 FT. UP WT IS 62K, -10K DWOB. 1 09:30 - 12:30 3.00 STWHIP ' P WEXIT ' DISCUSS WITH CTD SUPT AND ODE, DECIDE TO POOH AND PUT 2 JTS OF PH6 IN THE 1 TOOLSTRING. THE OVERPULL AND DEPTH DISCREPANCIES NOTED ABOVE LIKELY DUE TO THE BHA NOT TRACKING DOWN THE WHIPSTOCK TRAY i FACE PROPERLY DUE TO THE RESIDUAL BEND OF THE CT. 12:30 12:45 0.25 POOH . STWHIP P WEXIT TAG STRIPPER, TRIP SHEET IS -3 BBLS. FLOW CHECK AND PJSM FOR P/U NEXT BHA. 12:45 - 14:00 1.25 STWHIP I P 1 WEXIT !; STAND BACK INJECTOR. ADD 2 JTS OF PH6 TO THE BHA. CHECK MOTOR AND MILL, LOOKS OK. M/U CT RISER. 14:00 - 16:00 2.00 ! STWHIP P 1 WEXIT 1RIH BHA #3. PUMP 0.43 / 590 PSI THROUGH OPEN EDC. 16:00 - 16:20 0.33 STWHIP P WEXIT 1LOG FROM 10790 FT TO TIE -IN DEPTH. CORRECT -26 FT. 7.67 STWHIP P I 16:20 00:00 I I WEXIT i CLOSE EDC. DRY TAG WHIPSTOCK AT 10860 FT. FREE SPIN = 2220 -PSI AT 2.5 -BPM. PICK UP TO 10860 FT AND TIME MILL FROM ,THEREAT 1' PER HR. SEE PINCH PT AT 10864.5' WITH 120 -LBS WOB AND 50 -PSI MOTOR WORK. 1 INCREASE IN WOB TO 920 -LBS AND MOTOR WORK TO 120 -PSI AT 10865.5', INDICATING I STRING MILL IS CONTACTING CASING. 1 CONTINUE TO TIME MILL AHEAD TO 10868'. I I WOB FROM PINCH PT VARIES FROM 1900 TO I 1400-LBS. CIRCULATION PRESSURE FROM ___________ b 2420 TO 1450 -PSI. Printed 5/11/2011 10:26:03AM i TREE = FMC GEN 11 S 0 -2 1 B SAFETY WELL ANGLE < 70° @ 11460' " "" WELLHEAD = FMC CONTRO JEE BAD " "" A,OTUATOR = BAKER C KB. ELEV = 64' Completed CTD Sidetrack BF. ELEV = ? KOP = 2900' TxIA communication Max Angle = 95 @ 11720' 2198' 1 5 -1/2" CAM BAL -O SSSV NIP, ID = 4.562" Datum MD = 11180' O 1 w /5 -1/2" DSSSV (12/16/06), ID = 2.785" Datum TVD= 8800' SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2899 2897 11 CA DMY RK 0 08/20/10 13 -3/8" CSG, 72 #, L -80, ID = 12.347" i 2537' 2 5232 4767 49 CA DMY RK 0 08/20/10 3 7172 6035 50 CA DMY RK 0 05/02/82 4 8520 6913 47 CA DMY RK 0 05/02/82 5 9286 7460 42 CA DMY RK 0 05/02/82 Minimum ID = 2.377" @ 11760' 6 9356 7512 42 CA DMY RK 0 05/02/82 7 9745 7806 41 CA DMY RK 0 05/02/82 3 -3/16" X 2 -7/8" LNR XO 8 9819 7862 41 CA DMY RK 0 05/02/82 5 -1/2" Weatherford ER PKR I-1 10230' 1 9 10130 8098 41 CA DMY RK 0 05/02/82 10 10202_ 8152 41 _ CA DMY RK _ 0 05/02/82 2 7/8" 6.4# STL L -80 Liner Spacer - ID = 2.441" 10230' Ii 10266' H5 -1/2" BAKER PBRASSY 1 3-1/2" BTT Gen 2 Deployment Sleeve, ID = 3.00"I 10273' _ i i r∎ 10282' H 9 -5/8" X 5 -1/2" BAKER SAB PKR ID = 4.012" I 5 -1/2" TBG -PC. 17 #, L -80, .0232 bpf, ID = 4.892" H 10293' 10293' 1-1 -1/2" X 4 -1/2" XO I 40 0 10329' H3 -1/2" X 3- 3/16" XO I TOP OF 7" LNR H 10317' I 10353' 1- I4 -1/2" CAM DB -6 LANDING NIP, ID = 3.813" 1 10364' I--14 -1/2" BAKER SHEA ROUT SUB 1 4 -1/2" TBG -PC, 12.6 #, N -80, .0152 bpf, ID = 3.958" H 10366' 10366' (- {4 -1/2" TUBING TAIL ( 10374' H ELMD TT LOGGED 05/05/82 1 9 -5/8" CSG, 47 #, L -80, ID= 8.681"1 —{ 10597' TSGR - 10,644' 1 BCGL - 11,150' TOC - 10750' PERFORATION SUMMARY REF LOG: SWS MEM GR/CNL ON 06/10/01 Z4 exit 10863' 1-1TOW I ANGLE AT TOP PERF: 42° @ 11236' 43 0 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE ' 1 11760' 1-1 X 2 -7/8" XO 1 2 -1/2" 6 11236 - 10263 0 06/11/10 Cut 10,905 EN 2" 6 11313 - 11333 C 03/14/10 TOC 10910' w � t. —, 1 2" 6 11500 - 11515 C 07/13/09 CIBP @ 10920' � •: t4 OA 2" 6 11700 - 11750 C 05/09/02 =_ -4 � �� PBTD @ 14098' I 2" 4 12000 - 12300 C 06/11/01 ���`� 12 -7/8" L -80 Liner, Cemented & Perf'd 1-i 14138'1 2" 6 12900 - 13330 O 05/15/11 �� ` 2" 6 13720 - 14092 0 05/15/11 0��'�4� *� *� *� *V A I % 1 7" LIAR, 29#, L -80, .0371 bpf, ID = 6.1841-1 11627' ■44.4. 44.44 11300' 1H3 -112" HES MAPS CIBP(06/11/10) I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/02/82 ORIGINAL COMPLETION 09/01/10 JMO /PJC TREEC/IO(08 /18/10) WELL: 02 -21 06/11/01 CTD SIDETRACK (02 -21A) 10/29/10 MSE PROPOSED CTD SIDETRACK PERMIT No: 07/13/09 JKD /PJC CIBP/ PERFS (07/13/09) 05/17/11 Nordic 2 CTD SIDETRACK API No: 50- 029 - 20781 -0, 03/17/10 KJB /SV ADPERF (03/14/10) SEC 36, T11 N, R14E, 880.83' FEL & 929.11' FNL 06/18/10 JMF /SV SET CIBP /ADPERF (06/11/10) 08/25/10 JKC/AGR GLV C/O (08/20/10) BP Exploration (Alaska) • • sliar/E oriF L SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 PHONE (907) 279 -1433 FAX (907) 276 -7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 169912 8 aft 5104048 En Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02 -21A p ' � ° �_ °Cirrl Sundry Number: 311 -056 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Chair DATED this day of March, 2011. Encl. STATE OF ALASKA C Imo` " ALASKA.. AND GAS CONSERVATION COMMIS. 1. `�� // APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 1. Type of Request: ❑ Abandon - ® Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. - 0 Development ❑ Exploratory 201 -099 - 3. Address: ❑ Service ❑ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50- 029 - 20781 -01-00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU 02 - 21A - Spacing Exception Required? ❑ Yes 0 No 9. Property Designation: _ 10. Field / Pool(s): ADL 028308 & 028311 Prudhoe Bay Field / Prudhoe Bay Oil Pool -' 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 12408' - 9039' - 12338' 9038' 11300' / 11550' / 11900' None Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' Surface 2537' 13 -3/8" 2357' 2357' 4930 2670 Intermediate Production 10597' 9-5/8" 10597' 8427' 6870 4760 Liner 992' 7" 10317' - 11309' 8223' - 8940' 8160 7020 Liner 2073' 3-1/2' x 2 -7/8" 10298' - 12371' 8209' - 9038' Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 11236' - 12300' 8887' - 9037' _ 5 -1/2 ", 17# x 4 -1/2 ", 12.6# L -80 10293' / 10366' Packers and SSSV Type: 5-1/2" DSSSV Packers and SSSV 2198' MD / 2198' TVD 9 -5/8" x 5-1/2" Baker SAB Packer MD (ft) and TVD (ft): 10282' MD / 8197' TVD 12. Attachments: 13. Well Class after proposed work: IN Description Summary of Proposal ® BOP Sketch ❑ Detailed Operations Program ❑ Exploratory - El Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: April 1, 2011 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date: ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned ❑ WAG ❑ SPLUG - Suspended Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Cody Rymut, 564 -5452 Printed Name � M Iii. Title Engineering Team Leader / / Prepared Number: Signs , e 1. Phone 564 -4711 Date 3 ? / / EIiizabeth B arker 564 -5674 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness � r �., Sundry Number ✓ 1'X.J ❑ Plug Integrity t]0 BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ,V 3sOO fS� /3 O P S ( RECEIVED' Other. '. Z C -60 psi- A n , 1 rt/t T f 1 '�) C 2S !l Z CC l /-n� I iLerri D ! u-`1 p /4-ce "'` e.�✓' a v � ar64-1 . z o f�•4 LIAR 41 2011 Subsequent Form Required: / 0 - 4/ 0 Oil ��� �$' Commission Anchorage APPROVED BY / / 1 ' Approved B / COMMISSIONER THE COMMISSION //JJ Date / 1� Form 10-403 R= ' . 111/2010 - HAAS MAR 0 7 ZOif � R `?J4..j 3.z. Submit In Duplicate IG INA 1... !'' • • To: Alaska Oil & Gas Conservation Commission bp From: Cod Y R Y mut CTD Engineer Date: February 16, 2011 Re: 02 -21A Sundry Approval Sundry approval is requested for well 02 -21A. 02 -21A is a horizontal zone 2A coil sidetrack drilled in June 2001. The initial production rates were quality but, due to high initial gas rates, the well began cycling within a few months. A gas shut -off plug and adperf were completed in May 2002, but the production rates did not improve. Over the next 3 years, the well's production time was low due to recurring TxIA communication. The leak was finally addressed with a DSSSV in Oct 2006, indicating the control lines were leaking. The well produced until early 2009 when it was shut in for high GOR. In April 2009, CT rigged up to mill the CIBP but tagged collapsed liner at -11722'. Based on an MCNL run in June 2001, there was some up -hole adperf potential in Zone 2A and 2C. 15' of Zone 2A was added in the heel with a GSO of the lateral in July 2009. The well produced for about a year before reaching MGOR. In June 2010, another CIBP was added to isolate Zone 2A and 27' of Zone 2C were added. Unfortunately, the Zone 2C perfs '! produced only gas. The well is currently shut -in for high GOR. REASON FOR SIDETRACK Given the low oil rates and high GOR 02 -21A is a good candidate for a coil sidetrack. The proposed well will access a 50 acre target in SE DS 02. The proposed plan for 02-21A is to drill a through tubing sidetrack with the SLB /Nordic 2 Coiled Tubing Drilling rig on or around April 10th, 2011. The existing perforations will be isolated by a CIBP set pre -rig. The sidetrack, 02 -21 B, will exit the existing 7" liner and kick off in Zone 4 and land in zone Z2. The following describes work planned along with a schematic diagram of the proposed sidetrack. Pre -Rig Work: (scheduled to begin April 1st, 2011) 1. S PuII DSSSV 2. E Set CIBP at 10,920'MD V 3. E Jet Cut LNR @ 10,905'MD ✓ 4. W Torque LDS 5. V PT MV, SV, WV, add additional valve to IA due to TxIA communication 6. 0 Blind and bleed lines 7. 0 Remove well house, level pad scF 8. V Set TVVC 24hrs prior to rig arrival ra,�,4� if , et ?v 000 (D crr .Jvice� G'1 A TV CaZwt, roc wa ► � f• 14ese frred 4 'er• 40 c/`7 2001 To ' '�►• �'Pfv�s 'vet f < etly G/'Oc * 0 7 '7. p p�P�iP `feq� �$ A S'CCQQ F4 8 - /'rf �/� G9' fi d e J -c ck ( - 4n �t ck , j( f w q 6 0 � Q /144,1•404,4 T4,� C "te" �''.�� / p l TO S C Cltf 4o�G i f " i e df ( rff P/ or, tf q Rig Work: (April 10th, 2011) • • 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Pull 607' of 3 -1/2 "tubing. 3. Set 4 -1/2" x 7.00" through tubing whipstock 4. Mill 3.8" window at 10862'MD and 10' of rathole. Swap the well to mud. 5. Drill Build: 3.75" OH, 883'MD (12 deg /100' planned) with resistivity 6. Drill Lateral: 4.125" OH, 2430'MD (12 deg /100' planned) with resistivity N 7. Run 3- 3/16" x 2 -7/8" L -80 liner leaving TOL at 10,338'MD p 8. Pump primary cement leaving TOC at 10750'MD, 37 bbls of 15.8 ppg liner cmt planned 9. Cleanout liner and MCNL /GR /CCL log 10. Test liner lap to 2400 psi. 11. Perforate liner per asset instructions ( -800') 12. Freeze protect well, RDMO Post -Rig Work: 1. 0 Re- install wellhouse and FL's. 2. S Generic GLV's, run DSSSV 3. T ASRC Flow Back Test Cody Rymut CTD Engineer 564 -5452 CC: Well File Sondra Stewman/Terrie Hubble • • TREE _ 'MC GEN 11 SAFETY NOTES: WELL ANGLE < 70 11480' " "" WELLHEAD = FMC 02-21A CONTROL LINE SAO*** ACTUATOR = BAKER C KB. E-EV = 64' 8F. ELEV= 7 KOP= 2900' Max Angle = 15 11720' ® I 2198' I-- 5-1/7 CAM BA L -0 SSSV NIP, ID = 4.562" Datum MD = 11180' w /5-1/2" OSSSV (12/16/06), ID = 2.785' Datum IVO = 8800' SS GAS LIFT MANDRELS ST MD TVO DB/ TYPE VLV LATCH PORT DATE 1 2899 2897 11 CA OMY RK 0 08/20/10 13 -3/8' CSG, 72#, L-80, ID =12347" H 2537' 2 5232 4767 49 CA O Y RK 0 08/20/10 3 7172 6035 50 CA OW RK 0 05102/82 4 8520 6913 47 CA OW RK 0 05/02/82 Minimum ID = 2.37" @ 11360' 5 9288 7460 42 CA DMY RK 0 05/02/82 6 9356 7512 42 CA MY RK 0 05/02/82 3 -1/2" X 2 -7/8" LNR XO 7 9745 7806 41 CA OW RK 0 05/02/82 8 9819 7862 41 CA OW RK 0 05/02/82 9 10130 8098 41 CA OW RK 0 05/02/82 10 10202 8152 41 CA OW RK 0 05/02/82 I 10268' H5-1/2" BAKER PBR ASSY 1 I s ►.t 0 --I 10282' 1— i9 -5/8" X 5-1/2" BAKER SAB PKR ID = 4.012" I 1 5-1/2" TBG -PC, 17 #, L -80, .0232 bpf, ID =4.892' H 10293' 10293' H5 -1/2" X 4- 1/2 'X0 I i s r 10298' H 3.70" BKR DEPLOYMENT SL V , 10= 3.00" I TOP OF T' LNR i 10317 I 10353 H4-1/7 CAM DB -6 LANDING NIP, D. 3.813" I 10384' H4-1/2- BAKER SHEAROUT SUS 1 14 -1/2' TBG -iV, 12.8#, N-80, .0152 bpf, ID =3.958" H 10366' I 10366' H4-1/2" TUBING TAIL I 10374' H EL/00 TT LOGGED 05/05/82 I 7' MILLOUT WINDOW 11309' - 11316' I 1 9-518" CSG, 47 8, L -80, 10 = 8.681 "I —i 10597' • 16, ca ,t _ l o"co 5 "0-1.D c► /3P e 10920 ' #^ PERFORATION SUMMARY 1 "4 11300' - - I3 -1/2' HES MAPS CIBP (06/11/10) 1 REF LOG: SWS NEM GR/CNL ON 06/10/01 � •�t• 4 • * ANGLE AT TOP PERF: 42° @ 11236' = : � •� � 1 \ 4� � Note: Refer to Production OB for historical perf data _ I 11 360' H3-1/2" X 2 -7/8" XO, D = 2.370" H SIZE SPF INTBNAL Opn/Sgz DATE �� 4 I 2 -1/2' 6 11236.10263 0 06/11/10 1'1'1'1'1'1'1'1' A 9 2" 6 11313 -11333 C 03/14/10 • 11111111 11550' H2 -78 CIIBP (07 /13/09) 2" 6 11500 -11515 C 07/13109 4 4 4 4 4 4 2° 6 11700 -11750 C 05/09/02 11111111 11111111 2" 4 12000 -12300 C 06/11 /01 * ' '`� 11900' I- I GBP, 05/09/02 I I! 11 11111 1 \♦ 11111111 X 1 ■ 11111111111111• 4 17" LNR, 29#, L -80, .0371 bpf, ID = 6.184" H 11627 444411441 I PBTD I--I 12338' j ' *. 12-7/8" LNR, 8.188, L -80 STL, .0058 bpf, 0 = 2.37" H 12371' DATE REV BY COMMBYTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/02182 ORIGINAL COMPLETION 09/01 /10 JMO/PJC TREECAO(08/18/10) WELL: 02 -21A 08111101 CTO8IDETRACK(02 -21A) PERMIT No: '2010990 07/13!09 JKOYPJC CEP/ PERFS (07/13/09) API No: 50-029-20781-01 03/17/10 KJB/SV ADPERF (03/14/10) SEC 36, T11 N, R14E, 880.83' FEL & 929.11' FNL 08/18/10 JNE /SV SET CIBP/AOPERF (06/11/10) 08/25/10 JKGAGR GLV C/0 (08/20/10) SP Exploration (Alaska) 0 S TREE = - MC GENII 02-21 Q SAFETY NOTES: WELL ANGLE < 70" @ 11460' "' WELLHEAD = FMC CONTROL LINE BAD*" ACTUATOR = BAKER C KB. ELEV = �. Planned CTD Sidetrack BF. ELEV = , KOP= 2900' TxIA communication Max Ante = 15 11720' 0 + I 2198' 5 CAM BAL -O SSSV NP, ID = 4.562" - Datum ND= 11180' 1 f w/5 -1 DSSSV (12/16/06), ID 2.785" DatumTVD= 8800' SS GAS LIFT MANDRELS ST MD NO DEV TYPE VLV LATCH PORT DATE 1 2899 2897 11 CA DMY RK 0 08/20/10 13 -3/8" CSG, 72 #, L -80, ID = 12.347" H 2537' 2 5232 4767 49 CA DMY RK 0 08/20/10 3 7172 6035 50 CA DMY RK 0 05/02/82 4 8520 6913 47 CA DMY RK 0 05/02/82 Minimum ID = 2.37" @ 11360' 5 9286 7460 42 CA DMY RK 0 05/02/82 6 9356 7512 42 CA DMY RK 0 05/02/82 3 -112" X 2 -7/8" LNR XO 7 9745 7806 41 CA DMY RK 0 05/02/82 8 9819 7862 41 CA DMY RK 0 05/02/82 9 10130 8098 41 CA DMY RK 0 05/02/82 10 10202 8152 41 CA DMY RK 0 05/02/82 — — I 10266' H5 -1/2" BAKER PBRASSY - . "---1 10282' — 9 -5/8" X 5 -1/2" BAKER SA8 PKR ID = 4.012" 15 -12" TBG -FC, 17 #, L -80, .0232 bpf, ID = 4.897' H 10293' I--- - \ / I 10293' IH5 -12" X 4 - 1/2" XO I .r 1032b' - Liner Top Packer 40 % -- adjust to ELMD TOP OF 7" LNR I 10317' I ` ` -L 10 H 3 70" BKR DEPLOYMENT SLV, ID = 3.00" '-' I ` — I 10353' --I4 -1/2" CAM D8-8 LANDING NIP, D = 3.813" I 1 , 10364' H4 - 1/2" BAKER SHEA ROUT SUB I 4 -12" TBG -FC, 12.6#, N-80, .0152 bpf, ID = 3.958" —I 10366' ' ' 10366' H4 -1/2" TUBING TAIL I I 10374' H ELMD TT LOGGED 05/05/82 9 -5/8" CSG, 47 #, L -80, ID = 8.681" I—I 1o59r I • ■ TSG R - 1 BCGL - 11.150150' TOC - 10750' PERFORATION SUMMARY REEF LOG SWS MEM GR/CNL ON 06/10/01 ANGLE AT TOPPER: 42 °@11236' Z4 exit / 10862' I Mil Wndow off Mechanical Whipstock I Note: Refer to Production DB for historical perf data o SIZE SPF INTERVAL Opn /Sqz DATE 43 Trip for Ribsteer? 2 -12" 6 11236 - 10263 0 06/11/10 ." (11800' H 3- 3116" X 2 -718" XO 2" 6 11313 -11333 C 03/14/10 Cut 10,905 2" 6 11500 - 11515 C 07/13/09 TOC 10910' - Imo= mum. z' 6 11700- 11750 C 05/09/02 CIBP @ 10920'' 2' 4 12000 - 12300 C 06/11/01 `\} 2 -7/8" L -80 Liner, Cemented 8 Perf'd 14175' 1 7" LNR, 29#, L -80, 0371 bpf, ID = 6.184" — 11627'` 11300' I - 3 -1/2 HES MAPS CIBP (06/11/10) I ' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 05/02/82 ORIGINAL COMPLETION 09/01/10 JMO/PJC TREE C1IO(08 /18/10) WELL: 02 -21 06/11/01 CTD SIDETRACK (02 - 21A) 10/29/10 MSE PRORDSED CTD SIDETRACK PERMIT No: 07/13/09 JKD/PJC CIBP/ PERES (07/13/09) AR No: 50 -029- 20781 -0 03/17/10 KJB/SV ADPERF (03/14/10) SEC 36, T11 N, R14E, 880.83' FEL & 929.11' FNL 06/18/10 J'F/SV SET OBf ADPERF (06/11/10) 08/25/10 JKC/AGR GLV GO (0820 /10) BP Exploration (Alaska) j NORDIC - CALISTA RIG 1 CHOKE / REEL/CIRCULATION MANIFOLD DIAGRAM V12 V14 I T -111k 6000 pal SOP's 10 • 7.08" , , V16 - .� - Vtt 11 1J1A " *YPY WLRIY'4, ..j Transducers .1 POOR BOV, I! V2 I V1 V 16 111111* ,. BOMBER IfeWhluesrat s F,• r V17 To Poor Boy Ow Bunter HCR IC AIL �' IK 0K ""*" K II ',min. avwson psi, wtd4 1 I Ler lien pri 1168 I . ' a w. i 111111111 111111 ■ --se ea... 24/WIMM al 0141101( I 1 IIII Manual Choke — � 7TY �• t vx OSmsrena0V 0W I (t ir 000 s EOH!Diesel FP Line CoFlex Hose Iiii _ _ - 1 /4 Turn Hako � ` n,�, -. 10WO0 To Production Tree or Cross Over • II 1 - re etransducers - - - - CoFkx Hose CV11 0 I 0 0112 To Colkd Tuhin Bleed Oft Inner Reel Valve .. .ra ` .a. . - _ - C113 _ � !Cement Cement L ine I n I I kin 0/10 ' — CV3 CV2 T Stand Pipe .... Manual Choke �: . s�'�'.. - °- it • • - .. _ '•.` - - - Pressure Transducers 1 CV9 Mahon 4) CV1 CV77 I , 11111/ MN cva 1 Ia.—so._ ! sss!.srrw.rsrr k . Tiger Tank -__ ___ _._.._ -._ Mud Pump _ w — In From Q • '• Baker w MP t ti MP 2 • Choke • _— __-- . - - --• CV14 to Pits nem I a. R19 Floor Mud Pump #1 " CV16 Reverse Cir • • ' • -- _ Cir CT while 0. . milM 1111 To Manifold .. -.. -_ CV16 1-Jun-2010 4 m- ,.- ..- rr.....r,..r... e e rr.,wre nnu CoFkx Hose 12/30/10 Schhilikerger NO. 5672 Alaska Data • Consulting Services Company: State of Alaska 2525 Gambett Street, Suite 400 Alaska 04 8 Gas Cons Comm Anchorage, AK 99503 - 28384 Attn: Christine Shartzer . ATTN: Beth 333 West 7th Ave, Suite 100 Y 6 Anchorage, AK 99501 Job If Log Description Date 8L Color CD E -05 BL65-00011 MEM DDL 12/18/10 1 1 - 3B AY1M -00056 PROD PROFILE ; 4e,. —/ 11/27/10 1 e „ e h 1 11 -12 BM- I� :c• :ICZTIMM �DL' _ II 1 01-25 BG4H -00022 INJECTION PROFILE ' _ �1. — rejjti°., 1 04 -24 AY1M -00058 PROD PROFILE ' • 12/02/10 1 1 P2-16 B5JN -00077 1=alribr�Z V 1 A-41 BC Z2-00030 w /0Y4/X�Z, 1 04 -08 BCRJ- 000566 • • - • -44�,_ � ' r + Y 1 1 01 -24A BBSK -00043 (h9r1XN1,4 :7.191114 ��WiI!gY r F,e1 1 04-10 AV1H -00051 INJECTION PROFILE (f r'' i 1 . 15.268 BD88 -00080 MEM PROD PROFILE • °IfWE . 4 ti, 1 • 2. 28610 -19 BCRJ -00055 PROD PROFILE _ e ■ •,�!: tip T, 1 07 -23B AY1M -00056 SCMT ._ 1 _ 11/28/10 w 6( . e 1 1 1 02 -21A 8BSK -00042 SCMT a40 — 4) 11/23/10 • 1 1 ('/ 02-226 BL65 -00006 SCMT / — 12/11/10 A 1 1 18 -12B BBUO -00029 SCMT (j e — !`i j 08/30/10 r 1 1 (...... P2 -16 B5JN -00077 USIT ( '1 ' ^ ` 1 11/28/10 • 1 1 05 -27B BAUJ -00049 MCNL • , i' 09/18/10 1 e 4 1 16-066 BBSK -00037 ITS - , 11/15/10 1 s � 1 G -09B BGZ7 -00005 RST F � !S 09/20/10 1 1 E -34L1 BD88 -00050 MCNL _ b - 1 a 09/28/10 1 1 1 W -219 BGZ7 -00012 CH EDIT PDC -GR USIT 4 ' 11/22/10 • 14/ 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data 8, Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • • gyro/datta Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston. Texas 77043 713/461 -3146 Fax: 713/461-0920 December 29, 2010 State of Alaska - AOGCC Attn: Christine Mahnken ` r,„ 333 W. 7th Ave, Suite 1001. �� Anchorage, Alaska 99501 Re: Drill Site 2, Well #02 -21A Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, �# e/ (ri / l r Rob Shoup North American Regional Manager RS:kl Serving the Worldwide Energy Industry with Precision Survey Instrumentation • gyro data Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 713/461 -3146 Fax: 713/461 -0920 SURVEY REPORT BP Exploration Drill Site 2 #02 -21A Schlumberger Truck #2320 Prudhoe Bay, AK AK1210GCM226 22 Dec 2010 0 ` I Serving the Worldwide Energy Industry with Precision Survey Instrumentation ^ O n A Gyrodata Directional Survey for BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK, Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING • Job Number: AK1210GCM226 Azimuth Correction: Gyro: Bearings are Relative to True North Run Date: 22 Dec 2010 Surveyor: Vertical Section Calculated from Well Head Location Calculation Method: MINIMUM CURVATURE Closure Calculated from Well Head Location Survey Latitude: 70.201200 deg. N Longitude: 148.466650 deg. W Horizontal Coordinates Calculated from Local Horizontal Reference • A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.00 N 0.00 E • 0 - 11293.39 ft. RATE GYROSCOPIC CONTINUOUS MULTISHOT SURVEY RUN INSIDE 5 -1/2" TUBING ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO ORIGINAL RKB AT 64 FEET AMSL TUBING HEAD FLANGE TO ORIGINAL RKB= 30.09 MEASURED FROM TUBING HEAD TO SWAB= 7' SWAB- GYRO= 10' ZERO GYRO ON SWAB @ + 13' 100.00 0.23 114.11 0.06 100.00 0.2 114.1 0.08 S 0.18 E 200.00 0.15 139.01 0.03 200.00 0.5 120.2 0.26 S 0.45 E 300.00 0.32 131.97 0.04 300.00 0.9 126.3 0.55 S 0.75 E 400.00 0.45 140.55 0.04 400.00 1.6 130.8 1.04 S 1.20 E 500.00 0.44 145.28 0.01 499.99 2.4 134.8 1.66 S 1.67 E 600.00 0.34 163.45 0.04 599.99 3.0 138.8 2.26 S 1.97 E 700.00 0.47 154.53 0.04 699.99 3.7 142.5 2.91 S 2.24 E 800.00 0.37 148.41 0.03 799.99 4.4 144.0 3.56 S 2.58 E 900.00 0.28 197.38 0.07 899.98 4.9 146.6 4.07 S 2.68 E • 1000.00 0.11 150.91 0.05 999.98 5.1 148.8 4.38 S 2.65 E 1100.00 0.29 200.71 0.06 1099.98 5.4 151.0 4.70 S 2.61 E 1200.00 0.41 197.16 0.03 1199.98 5.8 155.4 5.28 S 2.41 E 1300.00 0.36 190.68 0.02 1299.98 6.3 159.2 5.93 S 2.25 E 1400.00 0.41 160.45 0.05 1399.98 7.0 160.6 6.58 S 2.31 E 1500.00 0.36 164.19 0.01 1499.97 7.6 160.8 7.22 S 2.52 E I 1 A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 1600.00 0.39 160.55 0.01 1599.97 8.3 160.9 7.84 S 2.71 E II 1700.00 0.38 183.41 0.04 1699.97 8.9 161.7 8.49 S 2.81 E 1800.00 0.29 192.86 0.03 1799.97 9.5 163.2 9.07 S 2.73 E 1900.00 0.40 231.39 0.06 1899.97 9.8 165.9 9.53 S 2.40 E 2000.00 0.29 171.81 0.09 1999.97 10.2 167.8 10.00 S 2.17 E 2100.00 0.49 105.40 0.11 2099.96 10.7 165.8 10.37 S 2.61 E 2200.00 0.28 56.88 0.09 2199.96 10.8 162.7 10.35 S 3.23 E 2300.00 0.40 91.83 0.06 2299.96 10.9 159.7 10.23 S 3.79 E 2400.00 0.38 114.83 0.04 2399.96 11.3 156.9 10.38 S 4.43 E 2500.00 0.35 109.31 0.01 2499.96 11.7 154.7 10.62 S 5.02 E 2600.00 0.54 122.20 0.05 2599.95 12.4 152.5 10.97 S 5.71 E 2700.00 6.05 103.57 1.39 2699.75 16.8 137.9 12.46 S 11.24 E 2800.00 8.45 109.64 0.63 2798.94 28.3 124.8 16.16 S 23.28 E 2900.00 10.39 117.31 0.58 2897.59 44.5 120.8 22.77 S 38.22 E 2925.00 10.81 123.97 1.29 2922.17 49.1 120.8 25.12 S 42.16 E • 2950.00 10.79 126.46 0.47 2946.73 53.7 121.2 27.82 S 45.99 E 2975.00 10.82 130.59 0.77 2971.28 58.4 121.8 30.73 S 49.65 E 3000.00 11.11 131.98 0.39 2995.83 63.1 122.5 33.87 S 53.23 E 3025.00 11.60 133.37 0.56 3020.34 67.9 123.2 37.21 S 56.84 E 3050.00 11.74 133.54 0.14 3044.82 72.9 123.9 40.69 S 60.51 E 3075.00 12.06 132.06 0.44 3069.28 78.0 124.5 44.19 S 64.30 E 3100.00 12.70 128.81 0.95 3093.70 83.3 124.9 47.66 S 68.38 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 3125.00 13.23 127.06 0.66 3118.06 88.9 125.1 51.11 S 72.80 E • 3150.00 13.76 125.62 0.63 3142.37 94.8 125.1 54.56 S 77.50 E 3175.00 14.71 124.05 1.03 3166.61 100.9 125.1 58.07 S 82.55 E 3200.00 15.30 123.53 0.61 3190.75 107.4 125.0 61.67 S 87.93 E 3225.00 16.10 123.14 0.81 3214.82 114.2 124.9 65.39 S 93.58 E 3250.00 16.96 122.91 0.86 3238.79 121.3 124.8 69.26 S 99.54 E 3275.00 17.32 122.83 0.36 3262.68 128.6 124.7 73.26 S 105.73 E 3300.00 17.77 123.01 0.45 3286.51 136.2 124.6 77.36 S 112.06 E 3325.00 18.31 123.32 0.55 3310.29 143.9 124.5 81.59 S 118.54 E 3350.00 18.63 123.70 0.34 3334.00 151.8 124.5 85.97 S 125.14 E 3375.00 19.17 124.31 0.58 3357.65 159.9 124.5 90.50 S 131.86 E 3400.00 19.64 124.77 0.49 3381.23 168.2 124.5 95.21 S 138.70 E 3425.00 20.14 125.50 0.56 3404.74 176.7 124.5 100.10 S 145.65 E 3450.00 20.91 126.21 0.81 3428.15 185.5 124.6 105.24 S 152.76 E 3475.00 21.40 126.54 0.50 3451.47 194.5 124.6 110.59 S 160.02 E • 3500.00 22.17 126.86 0.78 3474.68 203.8 124.7 116.13 S 167.46 E 3525.00 22.82 127.20 0.66 3497.78 213.3 124.8 121.89 S 175.09 E 3550.00 23.30 127.20 0.48 3520.78 223.1 124.9 127.81 S 182.89 E 3575.00 23.75 127.49 0.46 3543.70 233.1 125.0 133.87 S 190.83 E 3600.00 24.20 127.67 0.46 3566.55 243.2 125.2 140.06 S 198.88 E 3625.00 24.51 127.88 0.32 3589.32 253.5 125.3 146.38 S 207.03 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 3650.00 25.08 128.43 0.61 3612.02 264.0 125.4 152.85 S 215.27 E III 3675.00 25.47 128.52 0.39 3634.62 274.7 125.5 159.50 S 223.63 E 3700.00 25.93 128.56 0.46 3657.15 285.5 125.6 166.25 S 232.11 E 3725.00 26.64 128.58 0.71 3679.56 296.6 125.7 173.15 S 240.76 E 3750.00 27.09 128.43 0.46 3701.87 307.8 125.8 180.19 S 249.60 E 3775.00 27.71 128.37 0.62 3724.06 319.3 125.9 187.33 S 258.62 E 3800.00 28.47 128.28 0.76 3746.12 331.1 126.0 194.63 S 267.85 E 3825.00 29.21 128.28 0.74 3768.02 343.2 126.1 202.10 S 277.32 E 3850.00 30.02 128.37 0.81 3789.75 355.5 126.2 209.76 S 287.01 E 3875.00 30.93 128.28 0.91 3811.30 368.2 126.2 217.63 S 296.96 E 3900.00 31.60 128.30 0.67 3832.67 381.1 126.3 225.67 S 307.14 E 3925.00 32.45 128.42 0.85 3853.86 394.4 126.4 233.89 S 317.54 E 3950.00 33.34 128.53 0.89 3874.85 407.9 126.4 242.34 S 328.17 E 3975.00 34.29 128.66 0.95 3895.62 421.9 126.5 251.02 S 339.04 E 4000.00 35.21 128.76 0.92 3916.16 436.1 126.6 259.93 S 350.16 E 4025.00 36.10 128.75 0.89 3936.48 450.7 126.7 269.05 S 361.52 E • 4050.00 37.03 128.94 0.94 3956.56 465.5 126.7 278.40 S 373.12 E 1 4075.00 37.83 129.00 0.80 3976.41 480.7 126.8 287.95 S 384.94 E 4100.00 38.49 129.10 0.66 3996.07 496.2 126.9 297.68 S 396.93 E 4125.00 39.10 129.21 0.61 4015.55 511.8 126.9 307.57 S 409.08 E 4150.00 39.98 129.24 0.88 4034.83 527.7 127.0 317.64 S 421.41 E 4175.00 40.67 129.40 0.70 4053.89 543.9 127.1 327.89 S 433.92 E 1 A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 4200.00 41.44 129.45 0.77 4072.74 560.3 127.1 338.32 S 446.61 E • 4225.00 42.54 129.42 1.10 4091.32 577.0 127.2 348.94 S 459.52 E 4250.00 43.36 129.38 0.82 4109.62 594.0 127.3 359.75 S 472.69 E 4275.00 44.39 129.26 1.03 4127.64 611.3 127.3 370.73 S 486.09 E 4300.00 45.26 129.14 0.87 4145.37 628.9 127.4 381.87 S 499.75 E 4325.00 46.22 129.06 0.96 4162.82 646.8 127.4 393.16 S 513.64 E 4350.00 47.02 129.06 0.80 4179.99 665.0 127.5 404.61 S 527.75 E 4375.00 47.55 129.03 0.53 4196.95 683.4 127.5 416.18 S 542.02 E 4400.00 47.84 129.04 0.29 4213.78 701.8 127.6 427.83 S 556.38 E 4425.00 48.16 129.02 0.32 4230.51 720.4 127.6 439.53 S 570.81 E 4450.00 48.33 129.05 0.17 4247.15 739.1 127.6 451.27 S 585.30 E 4475.00 48.46 128.96 0.15 4263.75 757.8 127.7 463.04 S 599.82 E 4500.00 48.44 129.02 0.05 4280.34 776.5 127.7 474.81 S 614.37 E 4525.00 48.37 128.99 0.07 4296.93 795.2 127.7 486.58 S 628.90 E 4550.00 48.38 128.98 0.01 4313.54 813.8 127.8 498.33 S 643.42 E • 4575.00 48.48 129.00 0.10 4330.13 832.5 127.8 510.10 S 657.96 E 4600.00 48.38 128.96 0.10 4346.72 851.2 127.8 521.87 S 672.50 E 4625.00 48.30 129.00 0.09 4363.33 869.9 127.8 533.61 S 687.02 E 4650.00 48.50 129.03 0.20 4379.93 888.6 127.9 545.38 S 701.54 E 4675.00 48.32 129.04 0.18 4396.53 907.3 127.9 557.16 S 716.07 E 4700.00 48.32 129.02 0.01 4413.15 926.0 127.9 568.92 S 730.57 E 4725.00 48.43 129.08 0.12 4429.76 944.6 127.9 580.69 S 745.08 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 4750.00 48.34 129.01 0.10 4446.36 963.3 128.0 592.46 S 759.60 E II 4775.00 48.44 129.02 0.10 4462.96 982.0 128.0 604.23 S 774.12 E 4800.00 48.32 128.98 0.12 4479.57 1000.7 128.0 615.99 S 788.65 E 4825.00 48.41 128.91 0.10 4496.18 1019.4 128.0 627.74 S 803.18 E 4850.00 48.25 128.94 0.16 4512.80 1038.1 128.0 639.47 S 817.71 E 4875.00 48.38 129.02 0.14 4529.42 1056.7 128.0 651.22 S 832.22 E 4900.00 48.52 129.01 0.14 4546.00 1075.4 128.1 662.99 S 846.76 E 4925.00 48.45 128.99 0.07 4562.57 1094.2 128.1 674.77 S 861.31 E 4950.00 48.30 129.07 0.16 4579.18 1112.8 128.1 686.54 S 875.82 E 4975.00 48.35 129.12 0.06 4595.80 1131.5 128.1 698.32 S 890.32 E 5000.00 48.52 129.08 0.17 4612.39 1150.2 128.1 710.11 S 904.83 E 5025.00 48.05 129.29 0.50 4629.03 1168.9 128.1 721.91 S 919.30 E 5050.00 47.94 129.46 0.17 4645.76 1187.4 128.2 733.69 S 933.66 E 5075.00 48.24 129.66 0.33 4662.45 1206.0 128.2 745.54 S 948.00 E 5100.00 48.46 129.80 0.24 4679.07 1224.7 128.2 757.48 S 962.37 E 5125.00 48.66 130.14 0.32 4695.62 1243.4 128.2 769.52 S 976.73 E ID 5150.00 48.73 130.33 0.16 4712.12 1262.2 128.3 781.65 S 991.07 E 5175.00 48.85 130.30 0.12 4728.59 1281.0 128.3 793.82 S 1005.41 E 5200.00 48.92 130.43 0.12 4745.03 1299.8 128.3 806.02 S 1019.76 E 5225.00 48.99 130.48 0.08 4761.44 1318.7 128.4 818.25 S 1034.11 E 5250.00 49.04 130.49 0.05 4777.84 1337.5 128.4 830.50 S 1048.46 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 5275.00 48.91 130.30 0.19 4794.25 1356.4 128.4 842.73 S 1062.82 E • 5300.00 48.82 130.25 0.10 4810.70 1375.2 128.4 854.90 S 1077.19 E 5325.00 48.91 130.46 0.18 4827.14 1394.0 128.5 867.09 S 1091.54 E 5350.00 48.76 130.47 0.15 4843.60 1412.8 128.5 879.30 S 1105.86 E 5375.00 48.67 130.36 0.12 4860.09 1431.6 128.5 891.48 S 1120.16 E 5400.00 48.69 130.41 0.04 4876.60 1450.4 128.5 903.65 S 1134.46 E 5425.00 48.76 130.50 0.10 4893.09 1469.2 128.6 915.84 S 1148.76 E 5450.00 48.90 130.45 0.14 4909.55 1488.0 128.6 928.06 S 1163.07 E 5475.00 48.85 130.59 0.12 4925.99 1506.8 128.6 940.29 S 1177.39 E 5500.00 48.78 130.60 0.07 4942.45 1525.6 128.6 952.53 S 1191.68 E 5525.00 48.68 130.78 0.17 4958.94 1544.4 128.7 964.78 S 1205.92 E 5550.00 48.91 130.82 0.23 4975.41 1563.2 128.7 977.07 S 1220.16 E 5575.00 48.79 130.85 0.12 4991.86 1582.0 128.7 989.38 S 1234.40 E 5600.00 48.79 131.04 0.14 5008.33 1600.8 128.7 1001.71 S 1248.61 E 5625.00 48.88 130.98 0.10 5024.79 1619.6 128.8 1014.06 S 1262.81 E 5650.00 48.72 130.99 0.16 5041.26 1638.4 128.8 1026.40 S 1277.01 E • 5675.00 48.81 131.06 0.10 5057.73 1657.2 128.8 1038.74 S 1291.19 E 5700.00 48.93 131.03 0.12 5074.18 1676.0 128.8 1051.10 S 1305.40 E 5725.00 49.14 130.97 0.21 5090.57 1694.8 128.9 1063.49 S 1319.64 E 5750.00 49.02 131.02 0.13 5106.94 1713.7 128.9 1075.88 S 1333.90 E 5775.00 49.06 131.04 0.04 5123.33 1732.6 128.9 1088.27 S 1348.14 E 5800.00 49.08 131.16 0.09 5139.71 1751.5 128.9 1100.69 S 1362.38 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 5825.00 49.05 131.25 0.07 5156.09 1770.3 129.0 1113.13 S 1376.59 E • 5850.00 48.89 131.45 0.22 5172.50 1789.2 129.0 1125.59 S 1390.74 E 5875.00 48.88 131.55 0.08 5188.94 1808.0 129.0 1138.07 S 1404.85 E 5900.00 48.82 131.64 0.09 5205.39 1826.8 129.0 1150.57 S 1418.93 E 5925.00 48.73 131.67 0.09 5221.87 1845.6 129.1 1163.06 S 1432.98 E 5950.00 48.52 131.79 0.23 5238.39 1864.3 129.1 1175.55 S 1446.98 E 5975.00 48.59 131.71 0.09 5254.94 1883.0 129.1 1188.03 S 1460.96 E 6000.00 48.47 131.77 0.13 5271.50 1901.7 129.1 1200.50 S 1474.94 E 6025.00 48.44 131.86 0.07 5288.08 1920.4 129.2 1212.97 S 1488.88 E 6050.00 48.32 131.87 0.12 5304.68 1939.1 129.2 1225.45 S 1502.80 E 6075.00 48.23 131.91 0.09 5321.32 1957.7 129.2 1237.91 S 1516.69 E 6100.00 48.35 132.04 0.15 5337.95 1976.4 129.2 1250.39 S 1530.56 E 6125.00 48.56 132.11 0.22 5354.53 1995.1 129.3 1262.93 S 1544.45 E 6150.00 48.70 132.10 0.14 5371.06 2013.8 129.3 1275.51 S 1558.37 E 6175.00 48.83 132.03 0.14 5387.54 2032.6 129.3 1288.10 S 1572.33 E 6200.00 48.71 132.06 0.12 5404.01 2051.4 129.4 1300.69 S 1586.29 E • 6225.00 48.84 132.03 0.13 5420.49 2070.2 129.4 1313.29 S 1600.26 E 6250.00 48.93 131.94 0.11 5436.93 2089.0 129.4 1325.89 S 1614.26 E 6275.00 49.05 131.93 0.12 5453.33 2107.8 129.4 1338.49 S 1628.29 E 6300.00 49.21 131.94 0.16 5469.69 2126.7 129.4 1351.13 S 1642.35 E 6325.00 49.45 131.90 0.24 5485.98 2145.6 129.5 1363.79 S 1656.46 E 6350.00 49.49 131.89 0.04 5502.23 2164.6 129.5 1376.48 S 1670.61 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 6375.00 49.56 131.82 0.09 5518.46 2183.6 129.5 1389.17 S 1684.77 E • 6400.00 49.44 131.71 0.15 5534.69 2202.6 129.5 1401.83 S 1698.95 E 6425.00 49.52 131.72 0.08 5550.94 2221.6 129.5 1414.48 S 1713.14 E 6450.00 49.43 131.64 0.11 5567.18 2240.6 129.6 1427.12 S 1727.33 E 6475.00 49.31 131.55 0.14 5583.46 2259.6 129.6 1439.71 S 1741.52 E 6500.00 49.31 131.56 0.01 5599.76 2278.5 129.6 1452.29 S 1755.70 E 6525.00 49.43 131.58 0.12 5616.04 2297.5 129.6 1464.88 S 1769.90 E 6550.00 49.51 131.60 0.08 5632.28 2316.5 129.6 1477.49 S 1784.11 E 6575.00 49.75 131.50 0.25 5648.48 2335.5 129.6 1490.12 S 1798.36 E 6600.00 50.05 131.58 0.31 5664.58 2354.6 129.7 1502.80 S 1812.68 E 6625.00 50.13 131.49 0.11 5680.62 2373.8 129.7 1515.52 S 1827.03 E 6650.00 50.15 131.49 0.02 5696.64 2393.0 129.7 1528.23 S 1841.41 E 6675.00 50.10 131.50 0.05 5712.67 2412.1 129.7 1540.94 S 1855.78 E 6700.00 50.18 131.54 0.09 5728.69 2431.3 129.7 1553.67 S 1870.15 E 6725.00 50.32 131.52 0.14 5744.68 2450.5 129.7 1566.41 S 1884.54 E • 6750.00 50.32 131.53 0.01 5760.64 2469.8 129.7 1579.17 S 1898.94 E 6775.00 50.31 131.53 0.01 5776.61 2489.0 129.8 1591.92 S 1913.34 E 6800.00 50.34 131.61 0.07 5792.57 2508.2 129.8 1604.69 S 1927.74 E 6825.00 50.28 131.63 0.06 5808.53 2527.5 129.8 1617.47 S 1942.12 E 6850.00 50.35 131.53 0.10 5824.50 2546.7 129.8 1630.23 S 1956.51 E 6875.00 50.48 131.50 0.13 5840.43 2565.9 129.8 1643.00 S 1970.94 E _ A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 6900.00 50.60 131.50 0.12 5856.32 2585.2 129.8 1655.79 S 1985.39 E • 6925.00 50.63 131.62 0.10 5872.18 2604.5 129.8 1668.61 S 1999.85 E 6950.00 50.61 131.51 0.09 5888.04 2623.9 129.9 1681.43 S 2014.31 E 6975.00 50.69 131.46 0.09 5903.89 2643.2 129.9 1694.24 S 2028.79 E 7000.00 50.77 131.46 0.08 5919.72 2662.5 129.9 1707.05 S 2043.30 E 7025.00 50.80 131.52 0.06 5935.52 2681.9 129.9 1719.89 S 2057.81 E 7050.00 50.82 131.59 0.06 5951.32 2701.3 129.9 1732.74 S 2072.31 E 7075.00 50.79 131.51 0.07 5967.12 2720.6 129.9 1745.59 S 2086.81 E 7100.00 50.69 131.62 0.13 5982.94 2740.0 129.9 1758.43 S 2101.29 E 7125.00 50.79 131.68 0.11 5998.76 2759.3 129.9 1771.30 S 2115.75 E 7150.00 50.95 131.79 0.18 6014.54 2778.7 129.9 1784.21 S 2130.22 E 7175.00 50.66 131.82 0.29 6030.34 2798.1 130.0 1797.12 S 2144.67 E 7200.00 50.48 131.67 0.21 6046.22 2817.4 130.0 1809.98 S 2159.07 E 7225.00 50.82 131.66 0.34 6062.07 2836.7 130.0 1822.83 S 2173.52 E 7250.00 50.92 131.65 0.10 6077.84 2856.1 130.0 1835.72 S 2188.01 E 7275.00 50.95 131.82 0.14 6093.60 2875.5 130.0 1848.64 S 2202.49 E • 7300.00 50.85 131.78 0.10 6109.37 2894.9 130.0 1861.57 S 2216.95 E 7325.00 50.70 131.69 0.17 6125.17 2914.2 130.0 1874.47 S 2231.41 E 7350.00 50.77 131.67 0.07 6141.00 2933.6 130.0 1887.34 S 2245.86 E 7375.00 50.60 131.62 0.17 6156.84 2952.9 130.1 1900.19 S 2260.32 E 7400.00 50.56 131.64 0.04 6172.71 2972.2 130.1 1913.02 S 2274.75 E 7425,00 50.43 131.53 0.16 6188.62 2991.5 130.1 1925.82 S 2289.18 E r A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 7450.00 50.58 131.47 0.16 6204.52 3010.8 130.1 1938.61 S 2303.63 E . 7475.00 50.57 131.40 0.05 6220.39 3030.1 130.1 1951.39 S 2318.11 E 7500.00 50.56 131.43 0.03 6236.27 3049.4 130.1 1964.16 S 2332.59 E 7525.00 50.35 131.45 0.21 6252.19 3068.7 130.1 1976.92 S 2347.04 E 7550.00 50.31 131.43 0.04 6268.15 3087.9 130.1 1989.65 S 2361.46 E 7575.00 50.23 131.44 0.08 6284.13 3107.1 130.1 2002.38 S 2375.88 E 7600.00 50.41 131.29 0.21 6300.09 3126.4 130.1 2015.09 S 2390.32 E 7625.00 50.36 131.40 0.10 6316.03 3145.6 130.1 2027.81 S 2404.78 E 7650.00 50.29 131.36 0.08 6331.99 3164.9 130.1 2040.53 S 2419.21 E 7675.00 50.33 131.36 0.04 6347.96 3184.1 130.2 2053.25 S 2433.65 E 7700.00 50.38 131.34 0.05 6363.91 3203.3 130.2 2065.96 S 2448.11 E 7725.00 50.37 131.42 0.06 6379.85 3222.6 130.2 2078.69 S 2462.55 E 7750.00 50.21 131.44 0.16 6395.83 3241.8 130.2 2091.42 S 2476.97 E 7775.00 50.27 131.45 0.06 6411.81 3261.0 130.2 2104.14 S 2491.38 E 7800.00 50.32 131.49 0.06 6427.79 3280.3 130.2 2116.88 S 2505.79 E • 7825.00 50.14 131.40 0.19 6443.78 3299.5 130.2 2129.59 S 2520.19 E 7850.00 50.16 131.38 0.03 6459.80 3318.7 130.2 2142.28 S 2534.59 E 7875.00 50.09 131.32 0.08 6475.83 3337.8 130.2 2154.96 S 2549.00 E 7900.00 50.05 131.40 0.07 6491.87 3357.0 130.2 2167.63 S 2563.39 E 7925.00 49.89 131.30 0.18 6507.95 3376.2 130.2 2180.27 S 2577.76 E 7950.00 49.74 131.21 0.17 6524.08 3395.3 130.2 2192.87 S 2592.11 E 7975.00 49.67 131.20 0.07 6540.25 3414.3 130.2 2205.43 S 2606.46 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 8000.00 49.61 131.17 0.06 6556.44 3433.4 130.2 2217.97 S 2620.80 E • 8025.00 49.26 131.08 0.36 6572.70 3452.4 130.2 2230.47 S 2635.10 E 8050.00 49.26 131.03 0.04 6589.01 3471.3 130.3 2242.91 S 2649.39 E 8075.00 49.20 130.97 0.08 6605.34 3490.2 130.3 2255.33 S 2663.68 E 8100.00 49.07 130.92 0.14 6621.70 3509.1 130.3 2267.72 S 2677.96 E 8125.00 49.07 130.90 0.02 6638.08 3528.0 130.3 2280.09 S 2692.23 E 8150.00 48.90 130.83 0.18 6654.48 3546.9 130.3 2292.43 S 2706.50 E 8175.00 48.70 130.74 0.21 6670.95 3565.7 130.3 2304.72 S 2720.74 E 8200.00 48.67 130.70 0.04 6687.45 3584.5 130.3 2316.97 S 2734.97 E 8225.00 48.56 130.70 0.11 6703.98 3603.2 130.3 2329.20 S 2749.19 E 8250.00 48.39 130.53 0.21 6720.56 3621.9 130.3 2341.38 S 2763.40 E 8275.00 48.33 130.48 0.07 6737.17 3640.6 130.3 2353.52 S 2777.60 E 8300.00 48.19 130.46 0.14 6753.81 3659.3 130.3 2365.62 S 2791.80 E 8325.00 48.05 130.36 0.16 6770.50 3677.9 130.3 2377.69 S 2805.97 E 8350.00 47.94 130.38 0.11 6787.23 3696.5 130.3 2389.72 S 2820.12 E 8375.00 47.62 130.32 0.32 6804.03 3715.0 130.3 2401.71 5 2834.23 E • 8400.00 47.64 130.27 0.04 6820.88 3733.5 130.3 2413.66 S 2848.32 E 8425.00 47.45 130.15 0.21 6837.75 3751.9 130.3 2425.56 S 2862.41 E 8450.00 47.24 130.15 0.21 6854.69 3770.3 130.3 2437.42 S 2876.46 E 8475.00 47.27 130.06 0.07 6871.66 3788.6 130.3 2449.25 S 2890.50 E 8500.00 47.04 129.92 0.25 6888.66 3807.0 130.3 2461.03 S 2904.55 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 1 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 8525.00 46.71 130.07 0.35 6905.75 3825.2 130.3 2472.75 S 2918.52 E • 8550.00 46.32 130.15 0.39 6922.95 3843.4 130.3 2484.44 S 2932.40 E 8575.00 46.52 130.21 0.20 6940.19 3861.5 130.3 2496.12 S 2946.23 E 8600.00 46.16 129.94 0.41 6957.45 3879.6 130.3 2507.77 S 2960.07 E 8625.00 46.14 129.98 0.04 6974.77 3897.6 130.3 2519.35 S 2973.89 E 8650.00 46.12 129.88 0.07 6992.09 3915.6 130.3 2530.91 S 2987.71 E 8675.00 45.86 129.79 0.27 7009.46 3933.6 130.3 2542.43 S 3001.52 E 8700.00 45.77 129.72 0.10 7026.89 3951.5 130.3 2553.90 S 3015.30 E 8725.00 45.60 129.72 0.17 7044.35 3969.4 130.3 2565.33 S 3029.06 E 8750.00 45.40 129.61 0.21 7061.87 3987.2 130.3 2576.71 S 3042.79 E 8775.00 45.38 129.71 0.07 7079.43 4005.0 130.3 2588.07 S 3056.49 E 8800.00 45.27 129.71 0.11 7097.01 4022.8 130.3 2599.43 S 3070.16 E 8825.00 45.12 129.56 0.18 7114.63 4040.5 130.3 2610.74 S 3083.82 E 8850.00 45.07 129.59 0.05 7132.27 4058.2 130.2 2622.02 S 3097.47 E 8875.00 44.91 129.42 0.20 7149.96 4075.9 130.2 2633.27 S 3111.11 E 8900.00 44.67 129.48 0.24 7167.70 4093.5 130.2 2644.46 S 3124.71 E • 8925.00 44.68 129.47 0.01 7185.48 4111.1 130.2 2655.63 S 3138.28 E 8950.00 44.45 129.47 0.23 7203.29 4128.6 130.2 2666.78 S 3151.82 E 8975.00 44.26 129.46 0.19 7221.16 4146.1 130.2 2677.89 S 3165.31 E 9000.00 44.23 129.52 0.05 7239.07 4163.6 130.2 2688.98 S 3178.77 E 9025.00 44.01 129.47 0.22 7257.02 4181.0 130.2 2700.05 S 3192.21 E 9050.00 43.89 129.45 0.12 7275.02 4198.3 130.2 2711.08 S 3205.60 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 9075.00 43.76 129.43 0.13 7293.05 4215.6 130.2 2722.08 S 3218.97 E • 9100.00 43.59 129.36 0.18 7311.14 4232.9 130.2 2733.04 S 3232.31 E 9125.00 43.46 129.42 0.14 7329.26 4250.1 130.2 2743.96 S 3245.62 E 9150.00 43.43 129.47 0.05 7347.41 4267.3 130.2 2754.88 S 3258.89 E 9175.00 43.13 129.55 0.30 7365.61 4284.4 130.2 2765.79 S 3272.12 E 9200.00 42.94 129.45 0.20 7383.89 4301.5 130.2 2776.64 S 3285.28 E 9225.00 42.81 129.51 0.14 7402.21 4318.5 130.2 2787.46 S 3298.41 E 9250.00 42.66 129.47 0.15 7420.57 4335.5 130.2 2798.24 S 3311.50 E 9275.00 42.42 129.52 0.24 7438.99 4352.4 130.2 2808.99 S 3324.55 E 9300.00 42.20 129.58 0.22 7457.48 4369.2 130.2 2819.71 S 3337.52 E 9325.00 42.12 129.43 0.13 7476.01 4386.0 130.2 2830.38 S 3350.47 E 9350.00 42.04 129.29 0.12 7494.57 4402.7 130.2 2841.01 S 3363.42 E 9375.00 41.91 129.00 0.23 7513.15 4419.4 130.2 2851.56 S 3376.39 E 9400.00 41.69 129.55 0.43 7531.79 4436.1 130.2 2862.11 S 3389.29 E 9425.00 41.57 129.40 0.16 7550.47 4452.7 130.2 2872.67 S 3402.11 E 9450.00 41.51 129.28 0.10 7569.19 4469.3 130.2 2883.18 S 3414.93 E • 9475.00 41.25 129.21 0.26 7587.95 4485.8 130.2 2893.64 S 3427.73 E 9500.00 41.24 129.11 0.07 7606.74 4502.3 130.2 2904.04 S 3440.51 E 9525.00 41.11 129.22 0.15 7625.56 4518.7 130.2 2914.44 S 3453.27 E 9550.00 40.97 129.11 0.16 7644.42 4535.2 130.2 2924.81 S 3466.00 E 9575.00 40.94 129.07 0.04 7663.30 4551.5 130.2 2935.14 S 3478.72 E 9600.00 40.87 129.03 0.07 7682.19 4567.9 130.2 2945.45 S 3491.43 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 9625.00 41.02 129.07 0.15 7701.08 4584.3 130.1 2955.77 S 3504.15 E • 9650.00 41.21 129.08 0.19 7719.91 4600.7 130.1 2966.14 S 3516.92 E 9675.00 41.13 129.41 0.23 7738.73 4617.2 130.1 2976.55 S 3529.66 E 9700.00 41.08 129.65 0.17 7757.57 4633.6 130.1 2987.01 S 3542.34 E 9725.00 41.04 130.03 0.25 7776.42 4650.0 130.1 2997.53 S 3554.95 E 9750.00 40.86 130.10 0.19 7795.30 4666.4 130.1 3008.07 S 3567.49 E 9775.00 40.54 130.06 0.32 7814.25 4682.7 130.1 3018.57 S 3579.96 E 9800.00 40.85 130.65 0.49 7833.21 4699.0 130.1 3029.13 S 3592.38 E 9825.00 40.81 130.81 0.11 7852.12 4715.4 130.1 3039.79 S 3604.77 E 9850.00 40.60 130.73 0.22 7871.08 4731.7 130.1 3050.44 S 3617.12 E 9875.00 40.79 131.20 0.36 7890.03 4748.0 130.1 3061.13 S 3629.42 E 9900.00 40.62 131.57 0.30 7908.98 4764.3 130.1 3071.90 S 3641.66 E 9925.00 40.75 131.85 0.22 7927.94 4780.6 130.2 3082.75 S 3653.82 E 9950.00 40.78 132.33 0.31 7946.88 4796.9 130.2 3093.69 S 3665.94 E 9975.00 40.65 132.41 0.14 7965.82 4813.2 130.2 3104.68 S 3677.99 E 10000.00 40.88 132.99 0.44 7984.76 4829.5 130.2 3115.75 S 3689.98 E • 10025.00 40.96 133.40 0.28 8003.65 4845.8 130.2 3126.96 S 3701.92 E 10050.00 40.91 133.65 0.17 8022.54 4862.2 130.2 3138.24 S 3713.80 E 10075.00 41.00 134.23 0.39 8041.42 4878.5 130.2 3149.61 S 3725.60 E 10100.00 41.22 134.60 0.33 8060.25 4894.9 130.2 3161.11 S 3737.34 E 10125.00 41.43 135.04 0.36 8079.03 4911.4 130.2 3172.75 S 3749.05 E II A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 10150.00 41.29 135.30 0.22 8097.79 4927.8 130.3 3184.47 S 3760.69 E • 10175.00 41.74 135.51 0.47 8116.51 4944.3 130.3 3196.27 S 3772.33 E 10200.00 41.47 136.19 0.53 8135.20 4960.9 130.3 3208.18 S 3783.89 E 10225.00 40.82 135.92 0.67 8154.03 4977.2 130.3 3220.02 S 3795.30 E 10250.00 40.93 136.06 0.14 8172.93 4993.5 130.3 3231.79 S 3806.67 E 10275.00 41.27 136.32 0.38 8191.77 5009.9 130.3 3243.65 S 3818.05 E 10300.00 41.30 136.48 0.11 8210.56 5026.3 130.4 3255.59 S 3829.42 E 10325.00 41.18 136.71 0.19 8229.36 5042.6 130.4 3267.56 S 3840.75 E 10350.00 41.51 136.97 0.37 8248.13 5059.1 130.4 3279.61 S 3852.04 E 10375.00 41.45 137.18 0.15 8266.86 5075.5 130.4 3291.74 S 3863.32 E 10400.00 41.77 137.11 0.32 8285.55 5092.0 130.5 3303.91 S 3874.61 E 10425.00 42.02 137.20 0.26 8304.16 5108.6 130.5 3316.15 S 3885.97 E 10450.00 42.47 137.35 0.46 8322.66 5125.3 130.5 3328.49 S 3897.37 E 10475.00 43.07 137.59 0.62 8341.02 5142.1 130.5 3341.00 S 3908.84 E 10500.00 43.77 137.76 0.71 8359.18 5159.2 130.5 3353.71 S 3920.41 E 10525.00 44.70 138.11 0.96 8377.09 5176.5 130.6 3366.66 S 3932.10 E • 10550.00 45.42 138.18 0.72 8394.75 5194.0 130.6 3379.84 S 3943.91 E 10575.00 46.04 138.28 0.62 8412.20 5211.7 130.6 3393.19 S 3955.83 E 10600.00 46.41 138.89 0.58 8429.49 5229.6 130.6 3406.73 S 3967.77 E 10625.00 46.48 140.47 1.15 8446.72 5247.5 130.7 3420.54 S 3979.49 E 10650.00 45.98 141.94 1.17 8464.01 5265.3 130.7 3434.61 S 3990.80 E 10675.00 45.50 142.47 0.61 8481.46 5282.8 130.8 3448.76 S 4001.78 E I I A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 10700.00 45.23 142.04 0.41 8499.03 5300.2 130.8 3462.82 S 4012.67 E • 10725.00 44.83 141.87 0.42 8516.70 5317.6 130.8 3476.75 S 4023.57 E 10750.00 44.76 141.58 0.22 8534.44 5334.9 130.9 3490.58 S 4034.48 E 10775.00 44.34 141.18 0.51 8552.25 5352.1 130.9 3504.28 S 4045.42 E 10800.00 43.95 140.97 0.42 8570.19 5369.3 130.9 3517.83 S 4056.36 E 10825.00 43.79 140.78 0.21 8588.21 5386.3 131.0 3531.27 S 4067.30 E 10850.00 43.73 140.66 0.10 8606.27 5403.4 131.0 3544.65 S 4078.24 E 10875.00 43.71 140.66 0.02 8624.34 5420.4 131.0 3558.02 S 4089.20 E 10900.00 43.86 140.82 0.19 8642.39 5437.5 131.1 3571.41 S 4100.14 E 10925.00 43.62 140.73 0.25 8660.45 5454.5 131.1 3584.80 S 4111.08 E 10950.00 43.77 141.16 0.33 8678.52 5471.5 131.1 3598.21 S 4121.96 E 10975.00 43.68 140.54 0.44 8696.59 5488.6 131.1 3611.61 S 4132.87 E 11000.00 43.85 140.61 0.18 8714.65 5505.6 131.2 3624.97 S 4143.85 E 11025.00 43.79 140.96 0.25 8732.68 5522.7 131.2 3638.38 S 4154.79 E 11050.00 43.74 140.24 0.50 8750.74 5539.8 131.2 3651.74 S 4165.77 E III 11075.00 43.59 140.72 0.36 8768.82 5556.8 131.3 3665.06 S 4176.75 E 11100.00 43.50 141.06 0.25 8786.94 5573.8 131.3 3678.42 S 4187.62 E 11125.00 43.32 140.75 0.28 8805.11 5590.7 131.3 3691.76 S 4198.45 E I 11150.00 42.73 140.21 0.70 8823.38 5607.6 131.4 3704.91 S 4209.30 E 11175.00 42.94 140.44 0.26 8841.72 5624.3 131.4 3718.00 S 4220.16 E 11200.00 42.82 141.18 0.52 8860.03 5641.1 131.4 3731.18 S 4230.91 E 11225.00 42.52 140.24 0.70 8878.42 5657.8 131.4 3744.30 S 4241.63 E A Gyrodata Directional Survey BP ALASKA Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK Lease: PRUDHOE BAY, AK Well: DRILLSITE 2 WELL 02 -21A, 5 -1/2" TUBING Job Number: AK1210GCM226 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 25 ft. 11250.00 42.65 140.28 0.13 8896.82 5674.6 131.5 3757.30 S 4252.45 E 11275.00 42.30 140.91 0.55 8915.26 5691.2 131.5 3770.35 S 4263.17 E 11293.39 42.16 140.60 0.34 8928.88 5703.4 131.5 3779.92 S 4270.99 E Final Station Closure: Distance: 5703.43 ft Az: 131.51 deg. • BP ALASKA 28 Dec 11:15 Final Well: PRUDHOE BAY, AK DRILLSITE 2 WELL 02 -21A 5 -1/2" TUBING Gyrodata Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK AK1210GCM226 DEFINITIVE 0 -500 -1000 4 -1500 r 1 T C7 z _ -2000 0 - z - - 2500 _ • - 3000 r r T r BOTTOM HOl - LOCATED - MD: 11293.3 -3500 0 500 1000 1500 2000 2500 3000 3500 4000 EASTING (ft) BP ALASKA 28 Dec 11:17 Final Well: PRUDHOE BAY, AK DRILLSITE 2 WELL 02 -21A 5 -1/2" TUBING Gyrodata Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK AK1210GCM226 DEFINITIVE I I I 1 4 -, ti y t 7 7 r 1.2 • 1 1.0 J J J 1 1 1 L L • r - r uj O.8 •__ y y y y 7 ________r Y r - W - I 1 u, w 1 0 0 .6 - • /) 0. _ -_ _ _ J 141 L L • `� • ii ; � • BOTTOM HOLE 1; I LOCAL; ED ,, MD: 1;.293.39 1 I 0.2 r I I I 1 i I I I r r i I I `,I j 1 ll 0il II 1 lI III I, • I"'• I II I lj I I 1 i II I • I 1 1 NI I i 1 1 hi 'Ski II , , I , , 0.0 ,H,,,iii I I I 1 I 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 MEASURED DEPTH (ft) BP ALASKA 28 Dec 11:16 Final Well: PRUDHOE BAY, AK DRILLSITE 2 WELL 02 -21A 5 -1/2" TUBING Gyrodata Location: Schlumberger 2320, N. SLOPE BOUROUGH, AK AK1210GCM226 DEFINITIVE I I I I I I I I I I I I I I I I I I - I I I I I I 50 _ I I I I 45 BOTTOM HOLE 40 - LOCATED - MD: 11293.39 35- �- • _ I - I _ I Oz X30- f- - z v 25- r r r r r r r r r r r r z 20 - 7 r r r r r r r r r r r r 15 r r r r r r r r r r r F • _ I _ I 10 - T r r r r r r r r r r r r 5 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 MEASURED DEPTH (ft) BP ALASKA 28 Dec 11:16 Final Well: PRUDHOE BAY, AK DR.ILLSITE 2 WELL 02 -21A 5 -1/2" TUBING Gyrodata Location: Schlumberger 2320, N SLOPE BOUROUGH, AK AK1210GCM226 DEFINITIVE 240 _ I 220 -- -- r 200 180 • 160 -____ _ 1 1 2 _ 1 c � G N 140 -- - ----- t --- - - - - - + r r r- -I i- Q _ BOTTOM HOLE LOCATED MD: 11293.39 1 120 - � r 100 T _ r r 80- -- 60 1 1 L J J 1 L I I i _ I I I I 1 I I I 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 MEASURED DEPTH (ft) • Survey QC - RGS -CT Acceptance Sheet FIELD AND SURVEY INFORMATION - Operator BP ALASKA Field / Platform Schlumberger 2320 Well Number PRUDHOE BAY, AK DRILLSITE 2 WELL 02 -21A Survey section From 0 ft. to 11293.39 ft. Date 22 Dec 2010 Gyrodata Job No AK1210GCM226 Gyrodata Surveyors Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes /No /NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land /fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurvey with backup tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurvey with back up tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investigate and comment if effects are negligible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurvey with backup tool Inrun /Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other QC parameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV -Q166 (OPS SUR -MA -003) 13`" Nov 03 / Revision 12 Page 1 of 1 AK1210GCM226 Survey QC - RGS -CT Annsis Sheet gyr0/ t . C SURVEY QUALITY CONTROL - DATA ANALYSIS REFERENCE SYSTEMS Grid System I I Grid Correction 1 0.00 Azimuth reference: Grid / True North TRUE NORTH Vertical reference: RKB /MSL/Other RKB 1 If other give details 1 TIE ON DATA Depth 0.00 Inclination 0.00 Azimuth 0.00 1 TVD 1 0.00 Northings 0.00 Eastinqs 0.00 Latitude 70.2012 Az. Ref: Grid/True True Grid Corrected Y /N? N Description 1 CALIBRATION 1 Tool Number 1 1519 1 Calibration Date 1 14 Jun 2010 1 OPERATING TEMPERATURE Calibration range From 49.67 To 120.00 Gyro operating range From 74.77 To 91.84 1 Spec' - Within calibration range FIELD ROLL TEST (Only valid on fixed structures. When not possible input roll test data performed after return to base) 1 Cal value Pre job offset Post job offset Abs dif.cal.post Abs dif.pre.post Spec' Accel Scale 0.000061 - 0.000417 - 0.000413 0.000413 0.000004 Cal /Post - 0.00015 Mass Unbalance 2.48 -0.28 -0.38 0.38 0.10 Pre /Post - 0.4 ° /hr INITIALISATION Depth (Approx) 2900.47 No of stns 6 Spec' - Min No. - 6 Azimuth Mean 117.66 Std deviation 0.09 Spec' - Azi SD 0.2° Inclination Mean 10.25 Std deviation 0.00 Spec' - Inc SD 0.1° Earth Horizontal Rate Mean (Abs(meas-theor)) 1 0.05 Std deviation 0.02 Spec' - See Q167 DRIFT TUNE Residual x gyro bias Mean -0.003 Std dev' 0.006 Spec's - Mean and SD - 0.333 ° /hr Residual y gyro bias Mean -0.002 Std dev' 0.003 Spec's - Mean and SD - 0.333 ° /hr TOOLFACE RATE Maximum toolface rate 1 37.47 1 Spec' - 400° /sec IN /OUT COMPARISON (AZI' N/A IF INC' <15 °j Inclination Difference Mean 0.02 Std dev' 0.06 Spec's - Casing 0.3° /Drill pipe 0.3° Azimuth Difference Mean 0.22 1 Std dev' 0.09 Spec's - Casing 0.5° /Drill pipe 0.75° Lateral Divergence /1000 1.76 Spec - 5.0/1000 Vertical Divergence /1000 0.30 Spec' - 2.0/1000 DEPTH CONTROL Wireline Company Schlumberger 1 Line type 15/32 Encoder SF 1 Schlumberger Max Depth (TD) 11293.39 CCL Corrected No Zero Depth (Rig up) RKB @ 64 feet AMSL Rezero Depth -6.2 Given pup joint depth NA Measured P3 NA Strech cor. At TD divided by TD /1000 .54 Spec' - 1.5/1000 Dif. Between rigup and rezero depths divided by TD /1000 .55 Spec' - 2.0/1000 I Dif. Between given and meas depth divided by meas /1000 NA Spec' - 2.0/1000 SURV -Q165 (OPS SUR -MA -010) 22 " Jan 2004 / Revision 20 Page 1 of 1 AK1210GCM226 i Survey QC - RGS -CT Sp•cation Sheet a t SURVEY QUALITY CONTROL - SPECIFICATION DATA PRE -30B CALIBRATION VERIFICATION CHECK (ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg /min) 64 270.21 -7.13 - 0.00000178 -8.76 63 270.21 -6.99 - 0.00000175 -11.46 62 226.14 - 1908.80 - 0.00047605 -19.83 61 226.14 - 1903.25 - 0.00047467 -26.13 60 45.15 - 1966.28 - 0.00049034 -0.83 59 45.15 - 1963.01 - 0.00048953 -1.57 58 359.44 - 3238.27 - 0.00080488 2.91 57 359.44 - 3238.00 - 0.00080481 2.87 56 331.04 - 2199.78 - 0.00054707 1.44 55 331.04 - 2188.77 - 0.00054434 -0.73 54 301.54 - 590.65 - 0.00014725 -1.47 53 301.54 - 583.38 - 0.00014544 -1.60 52 269.65 -17.81 - 0.00000445 -4.36 51 269.66 -17.67 - 0.00000442 -6.47 50 241.31 - 1044.52 - 0.00026080 -5.62 49 241.31 - 1047.34 - 0.00026151 -8.05 48 210.42 - 2729.77 - 0.00067981 -2.03 47 210.42 - 2735.07 - 0.00068112 -2.85 46 181.74 - 3268.49 - 0.00081243 3.38 45 181.74 - 3261.87 - 0.00081080 1.46 44 150.92 - 2183.33 - 0.00054299 2.44 43 150.92 - 2181.85 - 0.00054263 2.55 42 119.31 - 497.14 - 0.00012397 1.25 41 119.31 - 495.20 - 0.00012348 0.37 40 91.03 -2.85 - 0.00000071 -1.50 39 91.03 3.69 0.00000092 0.04 38 60.68 - 1078.40 - 0.00026925 2.17 37 60.68 - 1083.35 - 0.00027048 1.05 36 31.21 - 2686.95 - 0.00066920 1.12 35 31.20 - 2693.61 - 0.00067085 2.13 34 0.35 - 3253.99 - 0.00080880 1.73 33 0.35 - 3252.12 - 0.00080833 0.79 32 270.97 -8.49 - 0.00000212 -9.60 31 270.96 0.13 0.00000003 -9.50 30 223.72 - 2057.72 - 0.00051307 -14.96 29 223.72 - 2066.77 - 0.00051532 -19.65 28 46.56 - 1894.10 - 0.00047240 0.24 27 46.56 - 1892.61 - 0.00047202 -1.75 26 0.06 - 3261.23 - 0.00081057 0.42 25 0.06 - 3254.70 - 0.00080896 1.99 24 331.11 - 2208.32 - 0.00054918 1.89 23 331.11 - 2205.21 - 0.00054841 0.77 22 301.18 - 579.18 - 0.00014440 -1.54 21 301.18 - 584.73 - 0.00014578 -3.35 20 270.90 -2.77 - 0.00000069 -4.98 19 270.90 -0.07 - 0.00000002 -4.45 18 240.33 - 1104.57 - 0.00027578 -4.35 17 240.33 - 1097.42 - 0.00027400 -5.29 16 211.18 - 2694.46 - 0.00067106 -0.17 15 211.18 - 2688.58 - 0.00066961 -3.07 14 181.21 - 3284.63 - 0.00081640 -0.11 13 181.21 - 3277.50 - 0.00081464 -0.55 12 150.94 - 2194.81 - 0.00054584 4.72 11 150.94 - 2198.58 - 0.00054677 4.14 10 121.66 - 599.89 - 0.00014956 6.22 9 121.66 - 591.42 - 0.00014745 5.82 8 90.30 -7.89 - 0.00000197 3.67 7 90.30 -7.30 - 0.00000182 4.25 6 61.70 - 1025.80 - 0.00025613 2.53 5 61.70 - 1015.57 - 0.00025358 1.99 4 30.62 - 2757.48 - 0.00068667 0.87 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 1 of 12 AK1210GCM226 4 Survey QC - RGS -CT Sp cation Sheet ro/ ,` x 3 30.62 - 2757.98 - 0.00068679 1.70 2 359.44 - 3317.43 - 0.00082442 4.78 1 359.44 - 3321.31 - 0.00082538 2.84 MBO = -0.28 Gravity Error = - 1676.26 Scale Factor Uncertainty = - 0.00041725 Rate Error = -1.72 POST - 30B CALIBRATION VERIFICATION CHECK (ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg /min) 17038 269.88 -30.01 - 0.00000750 -3.46 17037 269.88 -22.31 - 0.00000557 -4.68 17036 225.84 - 1951.27 - 0.00048661 -9.03 17035 225.84 - 1950.88 - 0.00048651 -11.88 17034 45.91 - 1944.30 - 0.00048487 -8.13 17033 45.91 - 1940.68 - 0.00048397 -10.62 17032 359.29 - 3242.96 - 0.00080604 -1.51 17031 359.29 - 3241.08 -0.00080557 -4.31 17030 330.95 - 2205.94 - 0.00054859 -1.13 17029 330.95 - 2196.73 - 0.00054631 -3.35 17028 301.32 - 602.87 - 0.00015030 -3.78 17027 301.32 - 603.70 - 0.00015050 -6.28 17026 271.45 -16.45 - 0.00000411 -4.14 17025 271.45 -9.83 - 0.00000245 -5.15 17024 239.88 - 1139.25 - 0.00028442 -5.48 17023 239.88 - 1133.01 - 0.00028287 -4.64 17022 211.89 - 2662.30 - 0.00066310 -1.84 17021 211.89 - 2654.01 - 0.00066105 -2.89 17020 181.22 - 3263.14 - 0.00081110 2.63 17019 181.22 - 3261.18 - 0.00081061 1.53 17018 150.05 - 2145.43 - 0.00053359 3.81 17017 150.05 - 2140.29 - 0.00053231 1.27 17016 121.39 - 608.21 - 0.00015163 2.00 17015 121.39 - 607.04 - 0.00015133 3.17 17014 91.43 -21.04 - 0.00000526 -2.25 17013 91.43 -22.00 - 0.00000550 -3.07 17012 59.84 - 1154.12 - 0.00028812 -2.73 17011 59.84 - 1156.37 - 0.00028869 -3.53 17010 32.18 - 2640.51 - 0.00065770 -3.29 17009 32.17 - 2635.69 - 0.00065650 -5.05 17008 1.37 - 3225.55 - 0.00080182 -4.62 17007 1.37 - 3224.52 - 0.00080156 -7.91 17006 270.10 -3.45 - 0.00000086 -0.62 17005 270.10 0.36 0.00000009 -3.41 17004 225.18 - 1952.48 - 0.00048691 -8.37 17003 225.18 - 1952.88 - 0.00048701 -9.94 17002 45.00 - 1963.30 - 0.00048960 0.72 17001 45.00 - 1958.92 - 0.00048852 1.06 17000 0.33 - 3194.96 - 0.00079422 1.38 16999 0.33 - 3199.45 - 0.00079533 3.52 16998 329.55 - 2087.11 - 0.00051913 0.26 16997 329.55 - 2085.09 - 0.00051863 0.06 16996 299.60 - 489.97 - 0.00012218 1.17 16995 299.60 - 495.26 - 0.00012350 0.98 16994 270.55 -2.43 - 0.00000061 2.63 16993 270.55 11.15 0.00000279 3.93 16992 241.17 - 1040.45 - 0.00025979 4.65 16991 241.17 - 1035.22 - 0.00025849 5.93 16990 211.55 - 2646.64 - 0.00065922 7.63 16989 211.55 - 2646.19 - 0.00065911 7.45 16988 180.41 - 3222.51 - 0.00080103 10.07 16987 180.41 - 3216.59 - 0.00079957 10.81 16986 150.47 - 2141.16 - 0.00053254 9.57 16985 150.47 - 2133.79 - 0.00053071 10.19 16984 120.48 - 530.81 - 0.00013235 7.72 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 2 of 12 AK1210GCM226 Survey QC - RGS -CT SpOfication Sheet gymIdata 16983 120.48 - 532.36 - 0.00013274 7.83 16982 89.55 -4.31 - 0.00000108 5.51 16981 89.55 2.00 0.00000050 8.59 16980 60.30 - 1078.09 - 0.00026918 1.99 16979 60.30 - 1077.06 - 0.00026892 1.35 16978 30.83 - 2682.94 - 0.00066821 -1.10 16977 30.83 - 2698.35 - 0.00067203 -0.39 16976 0.44 - 3251.59 - 0.00080821 -8.67 16975 0.44 - 3250.88 - 0.00080804 -10.49 MBO = -0.38 Gravity Error = - 1659.58 Scale Factor Uncertainty = - 0.00041313 Rate Error = -0.60 INITIALISATION Gyro Compass Reading / Station Raw Inclination Raw Azimuth Abs (ERMeas-ERTheo) 93 10.25 117.63 0.0329 94 10.25 117.69 0.0447 95 10.25 117.64 0.0394 96 10.25 117.81 0.0450 97 10.25 117.65 0.0646 98 10.25 117.54 0.0946 Average 10.25 117.66 0.0535 Tolerance on Average* 0.0817 Standard Deviation 0.00 0.09 0.0227 Tolerance on St. Dev. ** 0.1 0.2° 0.0373 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1 /Cosl) * J[(CosA *SinI *0.1) +0.08 ° /hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1 /Cosl) *J((cosA *SinI *0.1) +(0.08 /(n -1))] ° /hr DRIFT TUNES Drift Tune Ending Ending Ending Ending Residual Gx Bias Residual Gy Bias Number Time Depth Inclination Azimuth Start End Start End 1 599.20 3200.13 15.25 123.65 0.002 0.001 0.000 -0.001 2 1546.69 5300.09 48.91 130.38 0.001 -0.002 0.001 -0.004 3 1434.89 7300.29 50.92 131.91 -0.006 0.004 -0.000 -0.004 4 1587.91 9410.07 41.75 129.53 -0.000 -0.009 0.000 -0.006 5 1819.30 11295.89 42.38 140.59 -0.012 0.008 -0.000 0.001 6 1651.36 9400.84 41.72 129.51 0.007 -0.010 0.001 -0.001 7 1430.25 7398.31 50.57 131.56 0.000 -0.004 0.001 -0.003 8 498.89 7099.86 50.66 131.58 -0.000 -0.001 0.001 -0.000 9 1092.92 5300.47 48.85 130.24 0.006 -0.010 -0.006 0.005 10 1394.27 3199.99 15.63 123.21 0.000 -0.008 0.001 -0.003 11 571.47 2900.44 10.48 119.12 -0.001 -0.005 0.000 -0.002 Average -0.000 -0.003 -0.000 -0.002 Standard Deviation 0.005 0.006 0.002 0.003 Tolerance for both the Average and the Standard Deviation 0.033 /hr 0.033°/hr 0.033 /hr 0.033 /hr SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 3 of 12 AK1210GCM226 ■ Survey QC - RGS -CT Splfication Sheet f gyro/data INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * I Outrun * I Difference Inrun * I Outrun * I Difference 100.00 0.23 0.17 0.06 114.23 73.13 41.09 200.00 0.16 0.34 -0.18 139.64 146.27 -6.63 300.00 0.32 0.40 -0.08 131.84 150.28 -18.43 400.00 0.45 0.46 -0.01 140.35 149.87 -9.52 500.00 0.43 0.49 -0.06 145.17 156.02 -10.85 600.00 0.35 0.51 -0.17 163.95 162.58 1.37 700.00 0.47 0.40 0.07 154.24 158.84 -4.61 800.00 0.37 0.29 0.08 148.22 154.45 -6.24 900.00 0.27 0.29 -0.01 197.21 172.52 24.69 1000.00 0.11 0.29 -0.18 151.39 192.02 -40.63 1100.00 0.29 0.39 -0.10 200.27 204.59 -4.32 1200.00 0.41 0.50 -0.08 196.70 216.72 -20.02 1300.00 0.36 0.52 -0.16 190.93 191.22 -0.29 1400.00 0.41 0.54 -0.13 160.87 163.31 -2.45 1500.00 0.36 0.46 -0.10 164.67 168.70 -4.02 1600.00 0.39 0.38 0.01 160.19 176.21 -16.02 1700.00 0.38 0.37 0.01 182.94 195.29 -12.36 1800.00 0.29 0.36 -0.08 192.43 215.12 -22.69 1900.00 0.40 0.40 -0.00 231.54 174.74 56.80 2000.00 0.29 0.43 -0.14 171.51 130.51 41.00 2100.00 0.49 0.47 0.02 105.87 102.78 3.09 2200.00 0.28 0.51 -0.23 56.99 76.10 -19.11 2300.00 0.40 0.51 -0.11 91.45 88.28 3.18 2400.00 0.38 0.50 -0.12 114.46 102.93 11.53 2500.00 0.35 0.48 -0.13 109.75 125.23 -15.48 2600.00 0.54 0.58 -0.04 121.96 127.95 -5.98 2700.00 6.05 6.10 -0.05 104.05 105.26 -1.21 2800.00 8.45 8.59 -0.14 110.13 110.21 -0.08 2900.00 10.24 10.38 -0.14 117.51 118.54 -1.02 2925.00 10.78 10.86 -0.08 124.07 124.24 -0.17 2950.00 10.78 10.82 -0.03 126.28 126.47 -0.18 2975.00 10.79 10.85 -0.06 130.66 130.79 -0.12 3000.00 11.07 11.14 -0.07 131.90 132.07 -0.17 3025.00 11.58 11.63 -0.05 133.40 133.46 -0.05 3050.00 11.74 11.76 -0.02 133.54 133.60 -0.06 3075.00 12.01 12.08 -0.07 132.25 132.07 0.19 3100.00 12.69 12.74 -0.04 128.74 128.76 -0.02 3125.00 13.19 13.23 -0.04 127.17 127.09 0.08 3150.00 13.71 13.77 -0.05 125.69 125.61 0.08 3175.00 14.72 14.74 -0.02 124.09 124.03 0.06 3200.00 15.26 15.30 -0.04 123.66 123.51 0.15 3225.00 16.11 16.11 -0.00 123.21 123.10 0.11 3250.00 16.97 16.97 -0.00 122.99 122.83 0.16 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 4 of 12 AK1210GCM226 ■ Survey QC - RGS -CT Sp Sheet Ill! gyrol • 3275.00 17.32 17.32 -0.00 122.89 122.78 0.12 3300.00 17.78 17.78 0.00 123.13 122.98 0.15 3325.00 18.32 18.31 0.00 123.45 123.25 0.20 3350.00 18.63 18.62 0.01 123.82 123.62 0.20 3375.00 19.18 19.17 0.02 124.42 124.24 0.18 3400.00 19.62 19.62 0.01 124.87 124.67 0.20 3425.00 20.14 20.13 0.01 125.63 125.45 0.18 3450.00 20.92 20.91 0.01 126.33 126.13 0.20 3475.00 21.39 21.38 0.01 126.66 126.43 0.23 3500.00 22.19 22.18 0.02 127.00 126.78 0.22 3525.00 22.83 22.81 0.01 127.34 127.11 0.23 3550.00 23.30 23.29 0.01 127.32 127.09 0.23 3575.00 23.76 23.73 0.03 127.66 127.40 0.25 3600.00 24.21 24.19 0.02 127.83 127.58 0.26 3625.00 24.52 24.50 0.02 128.03 127.78 0.25 3650.00 25.09 25.08 0.02 128.59 128.35 0.24 3675.00 25.47 25.45 0.02 128.66 128.41 0.25 3700.00 25.94 25.91 0.03 128.72 128.47 0.26 3725.00 26.66 26.63 0.03 128.72 128.47 0.25 3750.00 27.10 27.08 0.02 128.61 128.34 0.27 3775.00 27.72 27.69 0.03 128.55 128.26 0.28 3800.00 28.48 28.46 0.02 128.44 128.17 0.26 3825.00 29.21 29.19 0.02 128.43 128.18 0.25 3850.00 30.04 30.01 0.03 128.54 128.27 0.27 3875.00 30.94 30.91 0.03 128.45 128.19 0.26 3900.00 31.61 31.58 0.03 128.46 128.19 0.26 3925.00 32.48 32.45 0.04 128.59 128.32 0.27 3950.00 33.35 33.30 0.04 128.72 128.44 0.29 3975.00 34.31 34.27 0.04 128.82 128.54 0.27 4000.00 35.23 35.19 0.04 128.92 128.64 0.28 4025.00 36.12 36.07 0.05 128.91 128.63 0.28 4050.00 37.06 37.02 0.04 129.11 128.82 0.28 4075.00 37.86 37.81 0.05 129.17 128.88 0.28 4100.00 38.51 38.46 0.05 129.28 128.99 0.29 4125.00 39.13 39.08 0.05 129.38 129.10 0.28 4150.00 39.99 39.94 0.05 129.41 129.13 0.28 4175.00 40.70 40.65 0.05 129.56 129.28 0.28 4200.00 41.46 41.40 0.06 129.62 129.34 0.29 4225.00 42.58 42.52 0.07 129.59 129.30 0.29 4250.00 43.39 43.34 0.05 129.56 129.26 0.30 4275.00 44.41 44.36 0.06 129.43 129.14 0.30 4300.00 45.27 45.22 0.06 129.32 129.04 0.29 4325.00 46.26 46.20 0.06 129.22 128.93 0.29 4350.00 47.05 46.99 0.06 129.23 128.95 0.28 4375.00 47.58 47.53 0.06 129.20 128.92 0.28 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 5 of 12 AK1210GCM226 Survey QC - RGS -CT Sp•ication Sheet gyrcyciata r 4400.00 47.87 47.81 0.05 129.21 128.93 0.28 4425.00 48.19 48.14 0.05 129.19 128.90 0.29 4450.00 48.37 48.32 0.05 129.23 128.93 0.29 4475.00 48.49 48.42 0.06 129.12 128.84 0.29 4500.00 48.48 48.42 0.06 129.19 128.90 0.29 4525.00 48.41 48.35 0.06 129.17 128.87 0.29 4550.00 48.41 48.35 0.06 129.16 128.86 0.30 4575.00 48.52 48.47 0.05 129.17 128.88 0.29 4600.00 48.40 48.36 0.04 129.13 128.85 0.28 4625.00 48.33 48.27 0.06 129.17 128.89 0.29 4650.00 48.53 48.47 0.06 129.21 128.91 0.30 4675.00 48.36 48.29 0.06 129.22 128.92 0.29 4700.00 48.34 48.28 0.05 129.20 128.91 0.29 4725.00 48.46 48.40 0.06 129.26 128.99 0.27 4750.00 48.38 48.33 0.05 129.19 128.90 0.28 4775.00 48.47 48.41 0.06 129.20 128.91 0.29 4800.00 48.34 48.28 0.06 129.15 128.87 0.28 4825.00 48.45 48.40 0.05 129.06 128.78 0.28 4850.00 48.27 48.21 0.06 129.11 128.83 0.28 1 4875.00 48.41 48.35 0.06 129.18 128.89 0.29 4900.00 48.54 48.48 0.07 129.17 128.89 0.28 4925.00 48.47 48.43 0.04 129.15 128.87 0.28 4950.00 48.34 48.29 0.05 129.24 128.97 0.26 4975.00 48.37 48.31 0.06 129.28 128.99 0.28 5000.00 48.56 48.49 0.06 129.25 128.97 0.28 5025.00 48.08 48.06 0.03 129.44 129.16 0.29 5050.00 47.96 47.90 0.06 129.63 129.37 0.26 5075.00 48.27 48.22 0.06 129.83 129.55 0.28 5100.00 48.48 48.43 0.06 129.96 129.68 0.28 5125.00 48.70 48.64 0.06 130.31 130.04 0.27 5150.00 48.76 48.71 0.05 130.48 130.22 0.26 5175.00 48.88 48.81 0.07 130.46 130.21 0.25 5200.00 48.95 48.89 0.06 130.60 130.35 0.25 5225.00 49.02 48.96 0.06 130.64 130.38 0.26 5250.00 49.08 49.08 0.00 130.64 130.49 0.15 5275.00 48.93 48.87 0.06 130.44 130.20 0.24 5300.00 48.85 48.78 0.07 130.39 130.17 0.23 5325.00 48.95 48.89 0.06 130.60 130.36 0.24 5350.00 48.78 48.73 0.05 130.62 130.37 0.25 5375.00 48.70 48.64 0.06 130.50 130.25 0.25 5400.00 48.72 48.65 0.07 130.56 130.32 0.24 5425.00 48.79 48.74 0.04 130.66 130.41 0.25 5450.00 48.92 48.86 0.06 130.59 130.33 0.26 5475.00 48.88 48.83 0.05 130.74 130.48 0.26 5500.00 48.82 48.76 0.06 130.76 130.52 0.25 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 6 of 12 AK1210GCM226 I Survey QC - RGS -CT Sp fication Sheet gyro/ 5525.00 48.70 48.65 0.05 130.93 130.68 0.25 5550.00 48.95 48.88 0.06 130.98 130.72 0.26 5575.00 48.82 48.78 0.04 131.01 130.74 0.27 5600.00 48.81 48.74 0.07 131.20 130.95 0.26 5625.00 48.91 48.87 0.05 131.14 130.87 0.26 5650.00 48.74 48.68 0.05 131.14 130.88 0.26 5675.00 48.84 48.78 0.06 131.22 130.96 0.26 5700.00 48.95 48.88 0.07 131.18 130.93 0.25 5725.00 49.18 49.16 0.02 131.12 130.84 0.28 5750.00 49.04 48.98 0.06 131.19 130.91 0.27 5775.00 49.08 49.03 0.05 131.19 130.95 0.25 5800.00 49.12 49.08 0.04 131.32 131.05 0.27 5825.00 49.08 49.03 0.05 131.41 131.15 0.26 5850.00 48.91 48.85 0.06 131.61 131.35 0.26 5875.00 48.92 48.86 0.06 131.70 131.44 0.27 5900.00 48.85 48.77 0.08 131.80 131.54 0.26 5925.00 48.76 48.73 0.03 131.83 131.57 0.26 5950.00 48.54 48.46 0.08 131.96 131.68 0.28 5975.00 48.62 48.56 0.07 131.87 131.61 0.27 6000.00 48.50 48.45 0.06 131.94 131.66 0.27 6025.00 48.47 48.41 0.06 132.01 131.75 0.26 6050.00 48.34 48.29 0.05 132.03 131.76 0.26 6075.00 48.26 48.20 0.05 132.07 131.81 0.25 6100.00 48.38 48.31 0.07 132.19 131.93 0.26 6125.00 48.59 48.52 0.07 132.27 132.00 0.27 6150.00 48.73 48.68 0.06 132.26 131.99 0.27 6175.00 48.86 48.80 0.06 132.19 131.94 0.25 6200.00 48.73 48.68 0.05 132.22 131.96 0.26 6225.00 48.87 48.81 0.06 132.18 131.91 0.27 6250.00 48.96 48.89 0.07 132.09 131.84 0.24 6275.00 49.08 49.02 0.06 132.08 131.83 0.26 6300.00 49.25 49.17 0.07 132.10 131.83 0.27 6325.00 49.48 49.40 0.08 132.06 131.80 0.26 6350.00 49.52 49.47 0.05 132.04 131.78 0.25 6375.00 49.59 49.52 0.07 131.97 131.73 0.24 6400.00 49.47 49.40 0.07 131.86 131.60 0.26 6425.00 49.56 49.50 0.06 131.87 131.62 0.25 6450.00 49.46 49.40 0.06 131.79 131.54 0.25 6475.00 49.33 49.27 0.07 131.70 131.46 0.24 6500.00 49.34 49.28 0.06 131.72 131.45 0.26 6525.00 49.46 49.37 0.08 131.73 131.48 0.25 6550.00 49.55 49.50 0.05 131.75 131.50 0.26 6575.00 49.79 49.71 0.08 131.64 131.40 0.24 6600.00 50.09 50.00 0.10 131.73 131.49 0.24 6625.00 50.17 50.10 0.07 131.64 131.37 0.27 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 7 of 12 AK1210GCM226 Survey QC - RGS -CT Spfication Sheet gyro/ . 6650.00 50.18 50.11 0.07 131.64 131.41 0.22 6675.00 50.13 50.07 0.06 131.65 131.40 0.25 6700.00 50.22 50.15 0.06 131.69 131.45 0.24 6725.00 50.35 50.27 0.08 131.67 131.43 0.24 6750.00 50.35 50.28 0.08 131.68 131.43 0.24 6775.00 50.35 50.28 0.07 131.68 131.43 0.25 6800.00 50.37 50.30 0.08 131.76 131.50 0.26 6825.00 50.31 50.24 0.07 131.79 131.54 0.25 6850.00 50.38 50.31 0.08 131.68 131.42 0.25 6875.00 50.52 50.44 0.08 131.65 131.41 0.24 6900.00 50.64 50.57 0.06 131.64 131.40 0.24 6925.00 50.66 50.59 0.07 131.77 131.54 0.23 6950.00 50.64 50.58 0.05 131.65 131.41 0.24 6975.00 50.72 50.65 0.07 131.60 131.37 0.24 7000.00 50.80 50.73 0.07 131.59 131.37 0.23 7025.00 50.84 50.75 0.09 131.66 131.42 0.25 7050.00 50.85 50.80 0.04 131.73 131.52 0.22 7075.00 50.83 50.75 0.09 131.65 131.42 0.23 7100.00 50.72 50.64 0.07 131.76 131.51 0.26 7125.00 50.83 50.74 0.09 131.81 131.59 0.22 7150.00 51.00 50.89 0.11 131.93 131.69 0.23 7175.00 50.64 50.77 -0.13 132.00 131.71 0.29 7200.00 50.51 50.46 0.05 131.80 131.57 0.23 7225.00 50.87 50.75 0.12 131.81 131.56 0.25 7250.00 50.96 50.87 0.09 131.79 131.57 0.22 7275.00 50.98 50.94 0.04 131.97 131.75 0.22 7300.00 50.89 50.80 0.09 131.92 131.67 0.25 7325.00 50.72 50.70 0.02 131.83 131.61 0.22 7350.00 50.79 50.77 0.02 131.79 131.59 0.20 7375.00 50.61 50.55 0.06 131.76 131.54 0.21 7400.00 50.58 50.55 0.03 131.79 131.56 0.23 7425.00 50.45 50.40 0.05 131.67 131.44 0.23 7450.00 50.61 50.54 0.07 131.61 131.39 0.22 7475.00 50.59 50.58 0.01 131.55 131.32 0.23 7500.00 50.59 50.53 0.06 131.57 131.35 0.23 7525.00 50.36 50.31 0.05 131.59 131.35 0.24 7550.00 50.33 50.31 0.02 131.58 131.36 0.22 7575.00 50.25 50.17 0.08 131.59 131.34 0.25 7600.00 50.45 50.37 0.08 131.43 131.17 0.26 7625.00 50.39 50.37 0.02 131.54 131.33 0.21 7650.00 50.30 50.25 0.06 131.50 131.24 0.26 7675.00 50.35 50.32 0.04 131.51 131.25 0.26 7700.00 50.40 50.37 0.04 131.49 131.26 0.23 7725.00 50.39 50.33 0.06 131.58 131.33 0.24 7750.00 50.23 50.20 0.04 131.59 131.39 0.20 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 8 of 12 AK1210GCM226 Survey QC - RGS -CT Sp.ication Sheet gyro • . . 7775.00 50.30 50.25 0.05 131.60 131.35 0.25 7800.00 50.34 50.29 0.05 131.64 131.40 0.24 7825.00 50.15 50.12 0.03 131.54 131.31 0.23 7850.00 50.18 50.14 0.04 131.53 131.29 0.24 7875.00 50.11 50.07 0.05 131.46 131.25 0.21 7900.00 50.07 50.05 0.01 131.55 131.30 0.25 7925.00 49.91 49.87 0.04 131.44 131.20 0.24 7950.00 49.76 49.72 0.04 131.36 131.13 0.23 7975.00 49.68 49.66 0.02 131.34 131.10 0.25 8000.00 49.62 49.58 0.04 131.32 131.09 0.23 8025.00 49.28 49.24 0.03 131.22 130.98 0.24 8050.00 49.28 49.24 0.04 131.18 130.94 0.23 8075.00 49.22 49.17 0.05 131.11 130.88 0.23 8100.00 49.09 49.07 0.02 131.07 130.82 0.24 8125.00 49.08 49.06 0.03 131.05 130.80 0.25 8150.00 48.91 48.88 0.04 130.98 130.73 0.25 8175.00 48.72 48.71 0.01 130.89 130.65 0.24 8200.00 48.69 48.66 0.02 130.84 130.61 0.23 8225.00 48.58 48.55 0.04 130.85 130.61 0.24 8250.00 48.41 48.39 0.02 130.66 130.46 0.21 8275.00 48.35 48.31 0.03 130.62 130.41 0.21 8300.00 48.20 48.16 0.03 130.60 130.37 0.22 8325.00 48.07 48.05 0.02 130.49 130.26 0.23 8350.00 47.95 47.91 0.04 130.53 130.28 0.25 8375.00 47.62 47.58 0.04 130.46 130.22 0.24 8400.00 47.66 47.64 0.02 130.42 130.19 0.24 8425.00 47.47 47.43 0.04 130.30 130.06 0.24 8450.00 47.25 47.21 0.04 130.30 130.05 0.24 8475.00 47.30 47.28 0.02 130.21 129.96 0.25 8500.00 47.05 47.01 0.05 130.06 129.83 0.23 8525.00 46.71 46.76 -0.06 130.21 129.87 0.34 8550.00 46.33 46.30 0.04 130.29 130.04 0.25 8575.00 46.55 46.51 0.04 130.36 130.12 0.24 8600.00 46.16 46.12 0.04 130.09 129.82 0.27 8625.00 46.16 46.15 0.02 130.15 129.89 0.26 8650.00 46.14 46.10 0.04 130.03 129.78 0.25 8675.00 45.87 45.85 0.02 129.94 129.70 0.24 8700.00 45.79 45.76 0.04 129.86 129.61 0.25 8725.00 45.61 45.58 0.04 129.87 129.63 0.24 8750.00 45.42 45.41 0.01 129.76 129.54 0.22 8775.00 45.40 45.36 0.04 129.86 129.60 0.26 8800.00 45.29 45.26 0.03 129.86 129.63 0.23 8825.00 45.14 45.10 0.03 129.69 129.44 0.25 8850.00 45.09 45.07 0.02 129.74 129.49 0.25 8875.00 44.91 44.89 0.02 129.56 129.31 0.25 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 9 of 12 AK1210GCM226 ■ Survey QC - RGS -CT Splfication Sheet f gyro/ . . R 8900.00 44.68 44.66 0.02 129.63 129.37 0.26 8925.00 44.70 44.66 0.04 129.62 129.38 0.24 8950.00 44.46 44.42 0.04 129.61 129.36 0.25 8975.00 44.27 44.25 0.02 129.60 129.35 0.24 9000.00 44.25 44.20 0.05 129.66 129.45 0.21 9025.00 44.02 43.98 0.03 129.62 129.36 0.26 9050.00 43.91 43.91 -0.00 129.58 129.36 0.23 9075.00 43.77 43.73 0.04 129.57 129.36 0.22 9100.00 43.61 43.60 0.01 129.50 129.27 0.23 9125.00 43.47 43.45 0.02 129.56 129.32 0.23 9150.00 43.44 43.40 0.04 129.61 129.38 0.23 9175.00 43.13 43.14 -0.00 129.70 129.47 0.22 9200.00 42.95 42.95 -0.00 129.58 129.37 0.20 9225.00 42.82 42.79 0.03 129.64 129.40 0.24 9250.00 42.67 42.67 -0.00 129.60 129.40 0.20 9275.00 42.43 42.42 0.01 129.66 129.44 0.22 9300.00 42.19 42.18 0.01 129.70 129.45 0.25 9325.00 42.13 42.12 0.01 129.55 129.35 0.20 9350.00 42.05 42.02 0.03 129.41 129.21 0.20 9375.00 41.90 41.92 -0.02 129.10 128.95 0.14 9400.00 41.70 41.68 0.01 129.68 129.54 0.14 9425.00 41.59 41.57 0.02 129.50 129.31 0.19 9450.00 41.53 41.49 0.04 129.39 129.23 0.16 9475.00 41.26 41.22 0.05 129.33 129.16 0.17 9500.00 41.27 41.23 0.04 129.21 129.04 0.17 9525.00 41.12 41.08 0.05 129.34 129.16 0.18 9550.00 40.99 40.97 0.03 129.22 129.06 0.16 9575.00 40.97 40.95 0.02 129.18 128.99 0.19 9600.00 40.88 40.82 0.07 129.14 128.94 0.20 9625.00 41.05 40.99 0.06 129.20 129.02 0.18 9650.00 41.23 41.18 0.05 129.21 129.00 0.22 9675.00 41.14 41.11 0.03 129.54 129.32 0.22 9700.00 41.10 41.08 0.02 129.78 129.55 0.23 9725.00 41.06 41.02 0.05 130.17 129.97 0.20 9750.00 40.86 40.85 0.01 130.22 130.14 0.08 9775.00 40.55 40.55 -0.01 130.18 129.94 0.24 9800.00 40.89 40.78 0.10 130.79 130.54 0.24 9825.00 40.82 40.82 -0.00 130.84 130.77 0.07 9850.00 40.60 40.56 0.05 130.83 130.67 0.16 9875.00 40.81 40.78 0.03 131.30 131.12 0.18 9900.00 40.63 40.58 0.05 131.69 131.52 0.17 9925.00 40.76 40.76 0.01 131.97 131.79 0.17 9950.00 40.79 40.77 0.02 132.45 132.25 0.20 9975.00 40.65 40.65 -0.00 132.51 132.36 0.15 10000.00 40.89 40.87 0.02 133.11 132.96 0.15 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 10 of 12 AK1210GCM226 1 Survey QC - RGS -CT Spfication Sheet f gyr4data 10025.00 40.97 40.93 0.04 133.51 133.33 0.18 10050.00 40.92 40.92 0.00 133.76 133.59 0.17 10075.00 41.02 41.00 0.02 134.35 134.17 0.18 10100.00 41.23 41.20 0.03 134.71 134.53 0.18 10125.00 41.45 41.45 0.00 135.16 134.98 0.18 10150.00 41.29 41.26 0.04 135.38 135.34 0.04 10175.00 41.75 41.74 0.01 135.62 135.40 0.22 10200.00 41.48 41.52 -0.03 136.31 136.18 0.13 10225.00 40.81 40.84 -0.03 136.08 135.82 0.25 10250.00 40.94 40.92 0.02 136.23 135.91 0.31 10275.00 41.28 41.28 0.01 136.49 136.23 0.26 10300.00 41.25 41.29 -0.04 136.61 136.40 0.21 10325.00 41.21 41.14 0.07 136.87 136.61 0.26 10350.00 41.53 41.46 0.07 137.13 136.87 0.26 10375.00 41.47 41.40 0.07 137.35 137.09 0.26 10400.00 41.78 41.76 0.03 137.26 137.00 0.26 10425.00 42.01 42.00 0.00 137.33 137.12 0.22 10450.00 42.50 42.46 0.05 137.49 137.27 0.23 10475.00 43.10 43.04 0.06 137.73 137.47 0.26 10500.00 43.80 43.73 0.06 137.90 137.64 0.25 10525.00 44.72 44.67 0.04 138.26 138.01 0.25 10550.00 45.44 45.39 0.05 138.32 138.07 0.25 10575.00 46.06 46.04 0.02 138.42 138.18 0.24 10600.00 46.43 46.41 0.02 139.01 138.77 0.25 10625.00 46.46 46.53 -0.06 140.60 140.40 0.20 10650.00 45.94 46.03 -0.09 142.04 141.93 0.11 10675.00 45.45 45.54 -0.09 142.58 142.45 0.13 10700.00 45.29 45.18 0.10 142.10 142.04 0.05 10725.00 44.79 44.84 -0.05 142.01 141.81 0.20 10750.00 44.72 44.81 -0.09 141.56 141.63 -0.07 10775.00 44.39 44.34 0.06 141.16 141.26 -0.10 10800.00 43.88 44.01 -0.13 140.99 140.96 0.03 10825.00 43.73 43.85 -0.12 140.75 140.84 -0.09 10850.00 43.71 43.76 -0.06 140.63 140.76 -0.14 10875.00 43.71 43.72 -0.01 140.63 140.75 -0.12 10900.00 43.89 43.83 0.05 140.92 140.82 0.09 10925.00 43.61 43.61 -0.01 140.81 140.67 0.14 10950.00 43.74 43.79 -0.06 141.30 141.13 0.17 10975.00 43.61 43.71 -0.10 140.62 140.48 0.15 11000.00 43.79 43.91 -0.12 140.63 140.57 0.06 11025.00 43.72 43.87 -0.15 140.99 141.01 -0.02 11050.00 43.66 43.81 -0.15 140.21 140.26 -0.05 11075.00 43.57 43.63 -0.07 140.60 140.82 -0.22 11100.00 43.45 43.53 -0.07 140.98 141.16 -0.18 11125.00 43.32 43.37 -0.05 140.65 140.87 -0.22 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 11 of 12 AK1210GCM226 1 Survey QC - RGS -CT Sp*cation Sheet gyroydata F 11150.00 42.68 42.74 -0.07 140.14 140.31 -0.17 11175.00 42.92 42.98 -0.06 140.37 140.51 -0.14 11200.00 42.77 42.82 -0.05 141.19 141.27 -0.08 11225.00 42.49 42.53 -0.03 140.23 140.27 -0.04 11250.00 42.63 42.70 -0.08 140.14 140.36 -0.23 11275.00 42.37 42.26 0.12 140.82 141.12 -0.30 Average 0.0225 0.2177 Standard Deviation 0.0561 0.0942 Tolerance for both the Average and the Standard Casing 0.3° Casing 0.5 Deviation Drillpipe 0.3° Drillpipe 0.75° * Inclination and Azimuth interpolated to same depths as shown. SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 12 of 12 AK1210GCM226 w • 111! gyro/data Survey QC - RGS -CT Acceptance Sheet FIELD AND SURVEY INFORMATION Operator BP ALASKA Field / Platform Schlumberger 2320 Well Number PRUDHOE BAY, AK DRILLSITE 2 WELL 02 -21A Survey section From 0 ft. to 11293.39 ft. Date 22 Dec 2010 Gyrodata Job No AK1210GCM226 Gyrodata Surveyors Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes /No /NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land /fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurvey with backup tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurvey with back up tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investigate and comment if effects are negligible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurvey with backup tool Inrun /Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other QC parameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV -Q166 (OPS SUR -MA -003) 13 Nov 03 / Revision 12 Page 1 of 1 AK1210GCM226 • STATE OF ALASKA ALASKA~AND GAS CONSERVATION COMMISS~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other ^ Performed: Alter Casing ^ Pull Tubing ^ Perforate New Pool ^ Waiver^ Time Extension ^ Change Approved Program ^ Operat. Shutdown ^ Perforate 0 Re-ente Suspended Well ^ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Number: Name: Development ^~ Exploratory ^ 201-0990 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ .API Number: Anchorage, AK 99519-6612 50-029-20781-01-00 8. Property Designation (Lease Number) : ~ 9. Well Name and Number ~ ADLO-028311 PBU 02-21A 10. Field/Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 12408 feet Plugs (measured) 11553 11900 feet 11300' 6/11/10 true vertical 9058.14 feet Junk (measured) None feet Effective Depth measured 11553 feet Packer (measured) 10282' true vertical 9041 feet (true vertical) 8213' Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" surface - 114 surface - 114 Surface 2503 13-3/8" 72# 1-80 surface - 2537 surface - 2537 5380 2670 Intermediate 10563 9-5/8" 47# L-80 surface - 10597 surface -8444 6870 500 Liner 992 7" 29# L-80 10317 - 11309 8239 - 8959 8160 7020 Sidetrack liner 2073 3-1/2"X2-7/8" 10298 - 12371 8225 - 9057 Sidetrack liner 9.2# 6-16# Perforation depth: Measured depth: SEE ATTACHED = _ _ True Vertical depth: _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 5-1/2" 17# L-80 SURFACE -10293 SURFACE - 8221 4-1/2" 12.6# L-80 10293' - 10366' 8221' - 8276' Packers and SSSV (type, measured and true vertical depth) 9-5/8"X5-1/2" BAKER SAB PKR 10282' 8213' 12. Stimulation or cement squeeze summary: Intervals treated (measured): ~~ ~UfT11111SSIU(1 `~ ~` '~ ~ "- A~asKa 0~1 ~ ~~s ~or~s Treatment descriptions including volumes used and final pressure . ,,,~;,,y,--i~,.: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 221 9199 43 366 Subsequent to operation: 464 43466 39 1036 14. Attachments: .Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development ^~ Service ^ Daily Report of Well Operations X 6. Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature ~ Phone 564-4944 Date 6/24/2010 vnn iv-•rvv r~cvwcu ncuva auu~int ~iyn~ai vniy RBDMS JUN 2.8 20 - ~-~`~® ' -~'~~~ 02-21 A 201-099 PERF ATTO[:HMFNT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 02-21A 6/11/01 PER 12,000. 12,300. 9,056. 9,055.62 02-21A 5/9/02 APF 11,725. 11,750. 9,056.44 9,054.51 02-21A 5/9/02 BPS 11,900. 11,910. 9,054.79 9,055.4 02-21A 5/10/02 APF 11,700. 11,725. 9,058.34 9,056.44 02-21A 7/12/09 APF 11,500. 11,515. 9,051.46 9,053.77 02-21A 7/12/09 BPS 11,550. 12,300. 9,056.54 9,055.62 02-21A 3/14/10 APF 11,313. 11,333. 8,962.32 8,976.4 02-21A 6/11/10 APF 11,236. 11,246. 8,905.31 8,912.71 02-21A 6/11/10 APF 11,246. 11,263. 8,912.71 8,925.29 02-21A 6/11/10 BPS 11,300. 11,700. 8,952.72 9,058.34 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • CJ 02-21A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 6/11/2010a***WELL SHUT-IN ON ARRIVAL***(E-LINE PLUG AND PERF) INITIAL T/I/O: 2300/350/50 PSI [CORRELATE TO MEMORY NEUTRON LOG DATED 10-JUNE-2001. ISET 3.5" HES MAPS CIBP AT 11300'. CONFIRM PLUG SET MIT TO 1500 PSI, PASSED ON 3RD TEST WITH 0 PSI LOST IN 30 MINUTES. PERFORATED INTERVAL 11246' TO 11263' WITH 2.5" HSD PJ2506 HMX 6 SPF 60 DEG PHASING GUN. CONFIRMED ALL SHOTS FIRED. PERFORATED INTERVAL 11236' TO 11246: WITH 2.5" HSD PJ2506 HMX 6 ~SPF 60 DEG PHASING GUN. CONFIRMED ALL SHOTS FIRED. LEFT WELL SHUT-IN AND SSV CLOSED. RDMO AND HAND OVER TO DSO. ~*JOB COMPLETE, DSO NOTIFIED OF DEPARTURE*** FLUIDS PUMPED BBLS 1 MEOH 1 Totai TREE = FMC GEN II WELLHEAD,=. FMC ACTUATOR = AXELSON KB. ELEV = 64' BF. ELEV = ? KOP = 2900' Max Angle = 95 @ 11720' Datum MD = 11180' Datum TV D = 8800' SS SAFETY W ELL ANGLE < 70° @ 11460' *** CONTRO~~NE BAD *** 02 -21 A I 13-3/8" CSG, 72#, L-80, ID = 12.347" I-I 2537' Minimum ID = 2.37" @ 11360' 3-1 /2" X 2-718" LNR XO 15-1/2" TBG-PC, 17#, L-80, .0232 bpf, ID = 4.892" I TOP OF 7" LNR I-I 10317' 4-1/2" TBG-PC, 12.6#, N-80, .0152 bpf, ID = 3.958" i-i 10366' 9-518" CSG, 47#, L-80, ID= 8.681"I-I 10597' PERFORATION SUMMARY REF LOG: SWS MEM GR/CNL ON 06/10/01 ANGLE AT TOP PERF: 42° @ 11236' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE - - 06/11/10 2" 6 11313 - 11333 C 03/14/10 2" 6 11500 - 11515 C 07/13/09 2" 6 11700 - 11750 C 05/09/02 2" 4 12000 - 12300 C 06!11!01 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" ~-) 11627' 5-1/2" CAM BAL-O SSSV NIP, ~ = 4.562" w/5-1/2" DSSSV (12/16/06), ID=2.785" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2899 2897 11 CA DOM RK 16 02/09/07 2 5232 4767 49 CA SO RK 20 02/09/07 3 7172 6035 50 CR DMY RK 0 05/02/82 4 8520 6913 47 CA DMY RK 0 05/02/82 5 9286 7460 42 CA DMY RK 0 05/02/82 6 9356 7512 42 CA DMY RK 0 05/02/82 7 9745 7806 41 CA DMY RK 4 05/02/82 8 9819 7862 41 CA DMY RK 0 05/02/82 9 10130 8098 41 CA DMY RK 0 05/02/82 10 10202 8152 41 CA DMY RK 0 05/02/82 1Ou-15-1/2" BAKER PBR ASSY 102$2' 9-5/8" X 5-112" BAKER SAB PKR ID = 4.012" 10293' 5-1/2" X 4-1/2" XQ I 10298' 3.70" BKR DEPLOYMENT SLV, ID = 3.00" 10353' 4-1/2" CAM DB-6 LANDING NIP, ID = 3.813" 10364' 4-112" BAKER SHEAROUT SUB 10366' 4-112" TUBING TAIL 10374' -rELMD TT LOGGED 05/05!82 7" MILLOUT WINDOW 11309' - 11316' 11300' 3-1/2" HES MAPS CIBP{06111/10) -718" 11360' 3-1/2" LNR, 9.2#, TC2 X 2 LNR, 6.16#, XO, ID = 2.37" 11550' 2-7/s" CIIBP (07/13i09~ 11900' -CIBP, o5/os/o2 PBTD -j 1233$' ~ 2-7/8" LNR, 6.16#, L-80, STL, .0058 bpf, ID = 2.37" DATE REV BY COMMENTS DATE REV BY COMMENTS 05!02/82 ORIGINAL COMPLETION 07/13!09 JKD/PJC CIBP/ PERFS (07/13/09) 06!11!01 CTD SIDETRACK (02-21A) 03/17/10 KJB/SV ADPERF (03/14/10) 11/10/06 CJN/TLH DSSSV SET {10/29/06) 06/18/10 JMF(SV SET CIBP/ADPERF (06/11110) 12/03!06 GJF/TLH DSSSV RESET'/LTTP PULLED 01102/07 CJNITLH GLV C/O &DSSSV C/O 12/16/06 02!09/07 RCT/PAG GLV C/O I 12371' PRUDHOE BAY UNIT WELL: 02-21A PERMIT No: 2010990 API No: 50-029-20781-01 SEC 36, T11 N, R14E, 880.83' FEL & 929.11' FNL BP 6cploration (Alaska] STATE OF ALASKA ALASKA AND GAS CONSERVATION COMMISS REPORT OF SUNDRY WELL OPERATIONS DECEIVED MAR ~ ~ 201D 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other ^ Performed: Alter Casing ^ Pull Tubing^ Perforate New Pool ^ Waiver^ Time Extensi~$c~~Qi1$. Change Approved Program ^ Operat. Shutdown ^ Perforate Q Re-enter Suspended Well ^ ml 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill Number: Name: Development ^~ Exploratory ^ 201-0990 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ .API Number: Anchorage, AK 99519-6612 50-029-20781-01-00 8. Property Designation (Lease Number) : 9. Well Name and Number ADLO-028311 PBU 02-21A 10. Field/Pool(s): ~, PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 12408 feet Plugs (measured) 11553 11900 feet true vertical 9058.14 feet Junk (measured) None feet Effective Depth measured 11553 feet Packer (measured) 10282' true vertical 9041 feet (true vertical) 8213' Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" surface - 114 surface - 114 Surface 2503 13-3/8" 72# I-80 surface - 2537 surface - 2537 5380 2670 Intermediate 10563 9-5/8" 47# L-80 surface - 10597 surface - 8444 6870 500 Liner 992 7" 29# L-80 10317 - 11309. 8239 - 8959 8160 7020 Sidetrack liner 2073 3-1/2"X2-7/8" 10298 - 12371 8225 - 9057 Sidetrack liner 9.2# 6-16# Perforation depth: Measured depth: SEE ATTACHED = _ _ True Vertical depth: Tubing: (size, grade, measured and true vertical depth) 5-1/2" 17# L-80 SURFACE - 10293 SURFACE - 8221 4-112" 12.6# L-80 10293' - 10366' 8221' - 8276' Packers and SSSV (type, measured and true vertical depth) 9-5/8"X5-1/2" BAKER SAB PKR 10282' 8213' 12. Stimulation or cement squeeze summary: Intervals treated (measured): {~ ~~§'~~ ~~t~ ~ ~ ~Ufi ~° .~~.y ~ Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 219 9203 41 368 Subsequent to operation: 14. Attachments: '4~. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development Q Service ^ Daily Report of Well Operations X .Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Pre I Title Data Management Engineer Signature Phone 564-4944 Date 3/26/2010 02-21 A 201-099 • Sw Name Operation Date Perf Operation Code PERF ATTACHME Meas Depth Top NT Meas Depth Base Tvd Depth Top Tvd Depth Base 02-21A 6/11/01 PER 12,000. 12,300. 9,056. 9,055.62 02-21A 5/9/02 APF 11,725. 11,750. 9,056.44 9,054.51 02-21A 5/9/02 BPS 11,900. 11,910. 9,054.79 9,055.4 02-21A 5/10/02 APF 11,700. 11,725. 9,058.34 9,056.44 02-21A 4/14/09 BPP 11,700. 11,722. 9,058.34 9,056.67 02-21A 7/11/09 FCO 1.1,600. 11,602. 9,058.75. 9,058.86 02-21A 7/12/09 _ APF 11,500. _ 11,515. _ 9,051.46 9,053.77 02-21A _ 7/12/09 BPS 11,503. _ 12,300. 9,056.54 9,055.62 02-21A 3/14/10 APF _ _ 11,313. 11,333. 8,962.32 8,976.4 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED _ MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED _ MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • 02-21A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY SUMMARY ACTIVITYDATE 3/13/2010 ""*WELL FLOWING ON ARRIVAL*** SHUT IN WELL PRIOR TO RIH. BEGIN RIH WITH TS: HEAD/ WB/ CCL/ 20 FT LOADED 2 IN PJ HSD GUN. ***JOB CONTINUED ON 14-MARCH-2010.*** 3/14/20101**'`JOB CONTINUED FROM 13-MARCH-2010.*** 1PERFORATED 11313-11333 FT WITH 2 IN PJ HSD GUN, 6 SPF, !60 DEG PHASING. PUMPED MEOH, POOH. SURFACE AND VISUAL CONFIRMATION OF SHOTS FIRED. FINAL T/I/0:2200/ 400/70 PSI. '"'"'"JOB COMPLETE, NOTIFY DSO AND LEFT LOCATION.*** x FLUIDS PUMPED BBLS 1 MEOH 2 diesel 1 Total TREE = FMC GEN II WELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV..- 4' BF. ELEV..- ? KOP = 2900' Max Angle = 95 @ 11720' Datum MD = 11180' Datum N D = 8800' SS • 02-21A 13-3/8" CSG, 72#, L-80, ID = 12.347" ~-~ 2537' Minimum ID = 2.37" @ 11360' 3-1 /2" X 2-7/8" LN R XO 5-1/2" TBG-PC, 17#, L-80, .0232 bpf, ID = 4.892" ~-~ 10293' TOP OF 7" LNR I--I 10317' 4-1/2" TBG-PC, 12.6#, N-80, .0152 bpf, ID = 3.958" ~-{ 10366' 9-5/8" CSG, 47#, L-80, ID = 8.681"~~ 10597' PERFORATION SUMMARY REF LOG: SWS MEM GR/CNL ON 06/10/01 ANGLE AT TOP PERF: 43° @ 11313' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2" 6 11313 - 11333 O 03/14/10 2" 6 11500 - 11515 O 07/13/09 2" 6 11700 - 11750 C 05/09/02 2" 4 12000 - 12300 C 06/11/01 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" i-1 11627' S~~~TES: WELL ANGLE < 70° @ 11460' *** CONTR~LINE BAD *** 2198' -{5-1/2" CAM BAL-O SSSV NIP, ID = 4.562" w/5-1/2" DSSSV (12/16/06), ID=2.785" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 2899 2897 11 CA DOM RK 16 02/09/07 2 5232 4767 49 CA SO RK 20 02/09/07 3 7172 6035 50 CA DMY RK 0 05/02/82 4 8520 6913 47 CA DMY RK 0 05/02/82 5 9286 7460 42 CA DMY RK 0 05/02/82 6 9356 7512 42 CA DMY RK 0 05/02/82 7 9745 7806 41 CA DMY RK 0 05/02/82 8 9819 7862 41 CA DMY RK 0 05/02/82 9 10130 8098 41 CA DMY RK 0 05/02/82 10 10202 8152 41 CA DMY RK 0 05/02/82 10266' ~~ 5-1/2" BAKER PBR ASSY 10282' 9-5/8" X 5-1/2" BAKER SAB PKR ID = 4.012" 10293' 5-1/2" X 4-1/2" XO 10298' 3.70" BKR DEPLOYMENT SLV, ID = 3.00" 10353' -14-1/2" CAM DB-6 LANDING NIP, ID = 3.813" 10364' 4-1/2" BAKER SHEAROUT SUB 10366' 4-1/2" TUBING TAIL 10374' ELMD TT LOGGED 05/05/82 7" MILLOUT WINDOW 11309' - 11316' ' 11360' 3-1/2" LNR, 9.2#, TC2 X 2-7/8" LNR, 6.16#, XO, ID = 2.37" 11550' 2-7/8" CIIBP (07/13/09) o/ 11900' CIBP, 05/09/02 PBTD -j 12338' ~ 2-7/8" LNR, 6.16#, L-80, STL, .0058 bpf, ID = 2.37" DATE REV BY COMMENTS DATE REV BY COMMEMS 05/02/82 ORIGINAL COMPLETION 07/13/09 JKD/PJC CIBP/ PERFS (07/13/09) 06111!01 CTD SIDETRACK (02-21A) 03/17/10 KJB/SV ADPERF (03/14/10) 11/10/06 CJN/TLH DSSSV SET (10/29/06) 12/03/06 GJF/TLH DSSSV RESET/LTTP PULLED 01/02/07 CJN/TLH GLV C/O &DSSSV C/O 12/16/06 02/09/07 RCT/PAG GLV C/O PRUDHOE BAY UNIT WELL: 02-21 A PERMfr No: RL010990 API No: 50-029-20781-01 SEC 36, T11 N, R14E, 880.83' FEL & 929.11' FNL BP Exploration (Alaska) STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI~ON REPORT OF SUNDRY WELL OPERATIONS ~~CEIlf~C1,-;~ ~~1~. ~ w~ ~~~~ 1. Operations Abandon ~ Repair Well ~ Performed: Alter Casing ~ Pull Tubing ~ Change Approved Program ~ Operat. Shutdown ~ 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB 64 KB - ADLO-028311 ~ 11. Present Well Condition Summary: Total Depth measured 12408 - feet true vertical 9058.14 . feet Effective Depth measured 11553 feet true vertical 9041 feet Casing Length Size Plug PerForations ~ Stimulate ~ - r • Perforate New Pool ~ Waiver~ Time Extension ~~ Bi_IIdEA}~PWG Perforate Q~ Re-enter Suspended Well [~ t. Current Well Class: 5. Permit to Drill Number: De~elopment ~ - Exploratory ~~ 2o~-osso ~ Stratigraphic r Service ~ 6. API Number: 50-029-20781-01-00 - 9. Well Name and Number: PBU 02-21A- 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool Plugs (measured) 11900 11~3 Junk (measured) None MD ND Burst Collapse Conductor 80 20" Surface 2503 13-3/8" 72# L-80 Su Intermediate 10563 9-5/8" 47# L-80 Su Liner 992 7" 29# L-80 10 Sidetrack liner 2073 3-1/2"X2-7/8" 10 9.2# 6-16# rf f d th• d d th• SEE A7T Surface - 114 Surface - 114 rface - 2537 Surface - 2537 5380 2670 rface - 10597 Surface - 8444 6870 5080 317 - 11309 8239 - 8959 8160 7020 298 - 12371 8225 - 9057 e ora ion ep . easure ep . ACHED - _ _ _ _ Tnae Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 5-1/2" 17# L-80 SURFACE - 10293' 4-1/2" 12.6# N-80 10293' - 10366' Packers and SSSV (type and measured depth) 9-5/8"X5-1/2" BAKER SAB PKR ~~ 10282' ~ 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbi Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SI Subsequent to operation: SI 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~ Dev~elopment ,~"'~+~ - Service ~ Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~- Gas ~ WAG I~ GINJ ~ WINJ ~ WDSPL ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed 1Vame Gary Preb Signature Form 10-404 Re ised 04/2006 Title Data Management Engineer ° Phone 564-4944 Date 7/14/2009 ;f~l"9iilA°a A!E"~ Y. ~ . SuhmiY (lrininal (lnlv 0 0 0 0 0 0 ; -,~~1~~ ,~t~~_ ix ~.= tOGa ~~ :~~,.~e~e~+sar~~ u~UL E~ LUU~ ~`(i~ i~ ~~~~~ 02-21 A 201-099 PFRF aTTOC'HMFNT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 02-21A 6/11/01 PER 12,000. 12,300. 9,056. 9,055.62 02-21A 5/9/02 APF 11,725. 11,750. 9,056.44 9,054.51 02-21A 5/9/02 BPS ` 11,900. 11,910. 9,054.79 9,055.4 02-21A 5/10/02 APF ~- ' 11,700. 11,725. 9,058.34 9,056.44 02-21A 4/14/09 BPP 11,700. 11,722. 9,058.34 9,056.67 02-21A 7/11/09 FCO 11,600. 11,602. 9,058.75 9,058.86 02-21A 7/12/09 APF 11,500. 11,515. 9,051.46 9,053.77 02-21A 7/12/09 BPS 11,553. 11,555. 9,056.64 9,056.71 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~ ~ ~ 02-21A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY FLUIDS PUMPED BBLS 10 FLO PRO 1 DIESEL 1 METH 91 Total e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc 02-21A (PTD #2010990) Classified as Problem Well ) Subject: 02-21A (PTD #2010990) Classified as Problem Well From: "Dube, Anna T" <Anna.Dube@BP.com> Date: Sun, 30 Ian 2005 20: 17:30 -0900 Tq: "GPB, FSl/SIP/STP Area Mgr" <GPBFSITL@BP.com>, "GPB, FSl DS2 Operator" . <QPBFSIDS20perator@.BP.com>, "OPB; Wells Opt Eng" <GPBWellsOptEng@BP.com>, "GPB, O~sMgr" <GPBOpsMgr@BP.com>, "NSU,ADWWL & Completion Supervisorlt . .. . . <~SUADWWL&ColTIpletionSuperVisor@BP.com>, "NSU~ ADW Well Operations Supervisor" . <NiSUADWWellOperationsSupervisor@BP.com>, "AOGCC -Jim Regg.(E:mail)". . <j~m_regg@adlnin.state.ak.us>, "AOGCC - Winton Aubert (E~nlail)" . . . . <W"inton_aubert@admin.state.ak.us>, "Rossberg, R Steven" <RossbeRS@BP.com>, "Dean, IamesA" <<l,~anja@BP.com>, "GPB, FSl DS Ops Lead" <OPBFS1.DSOpsLead@BP.com> . . .. C<Ç: "NSU,ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>, "Winslow, Scþtt W" <Lyonsw@BP.com> . .. ) ~l..;oCfq All, Well 02-21A (PTD # 2010990) has sustained pressure on the IA and has been classified as a Problem Well. The well failed a TIFL on 01/18/05 with the TIO's = 2420/1840/610. Although the wellhead pressures have not exceeded the pressure limits, it is suspected they would do so if not bled by operations. The well was shut-in today due to ambient temperatures and management of gas production. Current plans are to: 1.SL: DGL Vs in sta#1 2. DHD: Re-TIFL Attached is the wellbore schematic. Please call if you have any questions. «02-21A.pdf» Thank you, )I nna (j)u6e Well Integrity Coordinator GPB Wells Group Phone: (907) 659~51 02 Pager: (907) 659-5100 x1154 SCANNED FEB 2 22D05 Content-Description: 02-21A.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 2/3/2005 9:02 AM ) ) TREE = FMC GEN I WElLHEAD = FMC 'ACfUiVföR;; ....Axï~LsÓtr ks. ElE\7 = . --~64ï 'SF..ELE\Ï,..;....uu....m."....'...'."."'....'''.-'''.''i KOP = 2900' .~~.:~~..~ ~...=.....Æ$.~.1.1. 720.'.. DatumMD= 11180' Datum ïVÓ ;...... ..."àa6à.áS SAFETY NOTES: OGLV STUCK IN G..M #1, TxlA COMM, CONTROL LINE BAD. WELL EXCEEDS 70° @ 11460' AND ooES HORlZONTAL@ 11550'. 02-21 A 145-1/2" rAM BAL-O SSSV NIp, 10= 4.562" 1 GAS LFT I\i1ANDRELS OBI TYPE VLV LATCH 11 CA SO RK 49 CA DMY RK 50 CA DMY RK 47 CA DMY RK 42 CA DMY RK 42 CA DMY RK 41 CA DMY RK 41 CA DMY RK 41 CA DMY RK 41 CA DMY RK 8 2198' PORT DA 1E 20 03/05/04 0 05/02/82 0 05/02/82 0 05/02/82 0 05/02/82 0 05/02/82 0 05/02/82 0 05/02/82 0 05/02/82 0 05/02/82 ST MD 1VD 1 2899 2897 2 5232 4767 3 7172 6035 4 8520 6913 5 9286 7460 6 9356 7512 7 9745 7806 8 9819 7862 9 10130 8098 10 10202 8152 ~ ~ \13-3/8" CSG, 72#, L-80, 10 = 12.347" l-f 2537' L Minimum ID = 2.37" @ 11360' 3-1/2" X 2-7/8" LNR XO ~ 1 10266' 1-f5-1/2" BAKER FBRASSY 1 :8: --I 10282' l-f 9-5/8" x 5-1/2" BAKER SAB A<R 10 = 4.012" 1 ~ :8: \ / ~ ~ I I \5-1/2" TBG-FC, 17#, L-80, .0232 bpf, ID =4.892"H 10293' J ITOPOF4-1/2"TBG-FC H 10293' 1 1-15-1/2" X 4-1/2" XO 1 - 3.70"SKR DEPLOYMENT SLV,ID = 3.00" 1 -.L TTP~03/01/03).1 - 4-1/2'1 rAM DB-6 LANDING NP, 10 = 3.813" 1 \ 10293' 10298'- 10298' 10353' 1 TOP OF BKR LNR HGR 1-1 10317' 1 1 10364' 1-f4-1/2'~ BAKER SH~ROUTSUB 1 1 10366' 1-f4-1/2'; T_Qß!NGTAILI \ 10374' 1-iB..MD!TTLOGGED05/05/82 1 14-1/2" TBG-FC, 12.6#, N-80, .0152 bpf, 10 = 3.958" H10366' 1 I 7"MILLOUTWINDO'?" 11309'- 11316' 19-5/8" CSG, 47#, L-80,.ID= 8.681"H 10597' ---A 1- 3-1/2" LNR, 9.2#, TC2 X 2-7/8" LNR, 6.16#, XO, 10 = 2.37" PERFORATION SUIVTv1ARY REF LOG: SWS MEM GR/CNL ON 06/10/01 ANGLEA TTOP PERF: 94° @ 11700' Note: Refer to Production DB for historical perf data SIZ E SPF INTER\! AL Opn/Sqz DA 1E 2" 6 11700 - 11750 0 05/09/02 2" 4 12000 - 12300 C 06/11/01 11900' H CIBP, 05/09/02 1 ~ 12338' ~ \ 2-718" LNR, 6.16#, L-80,-l 12371' 1 STL, .0058 bpf, 10 = 2.37" [7" LNR, 29#, L-80, .0371 bpf, 10 = 6.184" H 11627' ~ 11632' 1 PRUDHOE BAY UNIT \/VELL: 02-21A PERMrr No: 2010990 ARNo: 50-029-20781-01 sæ 36, T11 N, R14E. 880.83' FEL & 929.11' FNL DATE REV BY COMIVENTS 04/15/02 ASffLH ÆRF CORRECTIONS 05/09/02 CJSlTLH ÆRFS & CIBP 03/01/03 JBM'KK SET L TIP 11/23/03 I\/t-I/ffi G GL V C/O 03/14/04 DA V/TLH GL V C/O [)l\TE 05102/82 06/11101 04/18/01 OS/26/01 06/11101 06/25/01 OOMIVENTS ORIGINAL COM PLETION CTD SIDETRACK (02-21A) OORRECTIONS SET WI-DPSTOCK GL V CORRECTIONS OORRECTIONS RBI BY RN'TLH J L..vTLH IllH CH'TP BP Exploration (Alas ka) Permit to Drill 2010990 MD 12408 ,----- 'I'VD DATA SUBMITTAL COMPLIANCE REPORT 61412003 Well Name/No. PRUDHOE BAY UNIT 02-21A Operator BP EXPLORATION (ALASKA) INC 9058 .~ Completion Dat 6/11/2001 ~'""- Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-2078'1-01-00 UIC N REQUIRED INFORMATION Mud Log N._.9o Sample N_.go Directional Survey ~/.,~.. DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt Log Log Run Name Scale Media No Interval Start Stop 10181 (data taken from Logs Portion of Master Well Data Maint) OH / Dataset CH Received Number Comments 12318 Case 7/30/2001 /,,J. fl.198 10181-12318 ! ED 0;~"_ - Ver LIS Verification 1 I -~- j(,J~,,"~ R Directional Survey FINAL IID---"' D MWD Survey FINAL i~'L~- ~ ~CCL/CNL 2 FINAL ~ ~"'~ C ] 10198 FINAL .~ /-"L'"'~ -I~duction Profile 5 FINAL Well Cores/Samples Information: 11303 10169 12318 10100 12408 Open 4/4/2002 ~-07'13 OH 7/6/2001 Directional Survey, Paper Copy OH 7/6/2001 MWD Survey, Digital Data 12316 OH 7/30/2001 10169-12316 BL, Sepia 10181 CH 7/30/2001 1~8 12318-10181 Digital Data 10500 CH 8/21/2001 10100-10500 BL, Sepia Interval Name Start Stop ADDITIONAL INFORMATION Well Cored? Y/(~ Chips Received? Analysis R~.r~.iv~.d~ Sent Received Daily History Received? Formation Tops Dataset Number Comments Comments: Compliance Reviewed By: Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X SET CIBP/Add Perfs Puli tubing_ Alter casing _ Repair well_ Other_X SET ClBP 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 5. Type of Well: Development _X Explorato~__ Stratigraphic__ Service__ 4. Location of well at surface 2153' FNL, 5177' FEL, Sec. 36, T11N, R14E, UM At top of productive interval 483' FNL, 1235' FEL, Sec. 01, T10N, R14E, UM At effective depth 1263' FNL, 780' FEL, Sec. 01, T10N, R14E, UM At total depth 1639' FNL, 456' FEL, Sec. 01, T10N, R14E, UM (asp's 686885, 5949029) (asp's 690917, 5945520) (asp's 691392, 5944752) (asp's 691726, 5944384) 6. Datum elevation (DF or KB feet) RKB 64 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 02-21A 9. Permit number / approval number 201-099 10. APl number 50-029-20781-01 11. Field / Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 2503' Intermediate 10563' Liner 992' Sidetrack Liner 2073' 12408 feet Plugs (measured) 9058 feet 11900 feet Junk (measured) 9055 feet Set CIBP @ 11900' (05/09/2002) Size Cemented Measured Depth True Vertical Depth 20" 520 sx Arcticset II 114' 114' 13-3/8" 2200 sx Fondu, 400 sx 2537' 2537' Permafrost 'C' 9-5/8" 500 sx Class 'G' 10597' 8444' 7" 425 sx Class 'G' 10317'- 11309' 8239'- 8959' 3-1/2" x 2-7/8" 78 sx Class 'G' 10298' - 12371' 8225' - 9057' Perforation depth: Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) 13. Stimulation or cement squeeze summary measured Open Perfs 11700' - 11750' Open Perfs Below CIBP 12000'- 12300' true vertical Open Perfs 9058' - 9055' Open Perfs Below CIBP 9056' - 9056' 5-1/2", 17#, L-80, PCTBG @ 10293' MD; 5-1/2" x 4-1/2" XO @ 10293'; 4-1/2", 12.6#, N-80, PC Tubing @ 10366' MD. RECEIVED 9-5/8" x 5-1/2" Baker SAB PKR @ 10282'. 5-1/2" Camco BAL-O SSSV Nipple @ 2198' MD. JiJi'i 0 4 Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation Shut-In Subsequent to operation 05/14/2002 Representative Daily Averaqe Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 1574 72786 313 232 16. Status of well classification as: Oil __X Gas _ Suspended _ Service Date May 21,2002 17. I hereby certify that the foregoing_is true and correct to the best of my knowledge. ,,,~z-~~'c~.~'-l~jC/~"y./''~ Title: Technical Assistant DeWayne R. Schnorr Form 10-404 Rev 06/15/88 · Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLI~T~ 02-21A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 05/09/2002 PACKERS / BRIDGE PLUGS: CAST IRON BRIDGE PLUG 05/10/2002 PACKERS/BRIDGE PLUGS: PERFORATING EVENT SUMMARY O5/O9/O2 KILL WELL WITH 1% KCL. RIH TO DRIFT WITH 2.25" JSN & STINGER. POOH. MU BAKER MHA, DS DEPTH CCL, HFS SETTING TOOL & 2-7/8" CIBP. KNOCK DOWN WHP, RIH. LOG FROM 10,200 TO 11,500 WITH DOWELL DEPTHLOG. CORRECT DEPTH. SET HFS 2-7/8" CIBP @ 11,900'. RU 25' PERF GUN. RIH, TAG CIBP FOR CONTROL, SHOT 11,725' - 11750' MD WITH 25' 2" 6 SPF GUN POOH. 05/1 O/O2 MU GUN #2. RIH. SHOT 11,700-11,725' MD WITH 25' 2" 6 SPF GUN. POOH. RDMO. <<<LEFT WELL SI & TURNED OVER TO DSO TO BACK FLOW>>> Fluids Pumped BBLS 0 PRESSURE TEST SURFACE PRESSURE CONTROL EQUIPMENT WITH DIESEL ( 0 TEST) 10 50/50 METHANOL WATER 377 1% KCL WATER 255 DIESEL 642 TOTAL ADD PERFS 05/09 - 10/2002 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 2" PJ 6 SPF, 60/120 DEGREE PHASING, RANDOM ORIENTATION. 11700'-11750' Page 1 Transmittal Form Baker Atlas BAKER HUGHES Canada GEOSciences Centre To: State of Alaska, Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Attention: Lisa Weepie Reference' B? Exploration, Inc. Pmdhoe Bay Unit Contains the following For Each Of The Above Wells: 1 - LAS Format disk 3- Films 1 - Measured Depth Wellbore GR MWD Print 1 - Measured Depth Ultra Slim PR-GR Print 1 - TVD Depth Ultra Slim PR-GR Print Sent By: JosefBerg ReceivedBy~~, '(~-~~ ~ .) [ ............................. .... .......... ..... .. . :.: ..... · .. . ..... . .......... .'. .,.7: · · .' ~.~:'-. ..:. . '~.~. .... '~ . 7' .~. "L-: . Date: ]~2~[VED Ap ' ..:.-...:.: ...:.. :..~ :...~=. '-'-- -'"--::'-'..:.'~-~(5..':i :.. Date: ~':.:~-: '.-'-':--':;-:---.':-?:-::i 0 ,'; 2002 -"'? ........ · .. ......... :'..'. .. '[:.5 7,- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RET .l/ti~'l~G " ....... -"-'"':":-'="'='-' OR FAXING YO UR C O PY FAX: (403) 537-3767 Baker Atlas #1300, 401-9th Ave. S.W. Calgary, Albert a, Canada T2P 3C5 Direct: (403) 537-3752 FAX: (403) 537-3767 08/16/01 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-571t ATTN: Sherrle NO. 1379 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job # Log Description Date Blueline Color Sepia Prints CD K-tOA f"-~(~i '-~,..~ PRODUCTION PROFILE 0810510t 1 1 D.$. 2-21A <::~l--oc:~ , PRODUCTION PROFILE 0810310t I 1 D.S. 12-21 /<~q~)4~/~ LEAK DETECTION LOG 08/07101 I t PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: RECEIVED AUG 2-1 2001 Alaska Oil & Gas Cons. Commission Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5/7~ 1 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1316 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blueline Sepia Prints CD D.S. 2-21A ~Zl)J- O~ 21327 MCNL 06/10/01 D.S. 18-34 J~;-_/~zir LEAK DETECTION 07/07/01 I 1 A-17 I~)" ~.~F,., LEAK DETECTION 071'18/01 Y-14A 14~;.. ~Z~/'-~ LEAK DETECTION 07112/01 X-15L1 ~.,OI-- O~] 21330 MCNL 06/11/01 I 1 I 07/24/01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Dehvered. Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-571 ATTN: Sherrie Received by: RECEIVED JUL 2_001 Ala~0il& Ga~ Co~s. ~ ~chorage ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well OIL r~ GAS [] SUSPENDED D ABANDONED N SERVICE N 2. Name of Operator '~'J'~)~ 7. Permit Number BP Exploration (Alaska), Inc. ~ 201-099 3. Address~ 8. APl Number P. O. Box 196612 Anchorage, AK 99519-6612 50-029-20781-01 4. Location of well at surface I-.~,%....~.~,,: ~ ~ 9. Unit or Lease Name 2153' FNL, 5177' FEL, Sec. 36, T11N, R14E, UM (asp's 686884, 5949029) '] ~'~':""" ~:~ ;'~'~'; i Prudhoe Bay Unit At Top Producing Inte~al ~ _~ :~2:'C~~ ~ 10. Well Number ~ ..- { 02-21A 812' FNL, 981' FEL, SEC 1, T10N, R14E, UM (asp's 691180, 5945197) .~ .¢::~;;:~? ~ At Total Depth~ J ~ ;: 11. Field and Pool 1638' FNL, 455' FEL, SEC 1, T10N, R14E, UM (asp's 691725, 5944384)~:~LX~;~;::;:~ Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. RKB 64 feet~ ADL 28311 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. ~ 15. Water Depth, if offshore 16. No. of Completions June 3, 2001 June 7, 2001 June 11,2001 ~ N/A feet MSL 1 I 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Su~ey ~20. Depth where SSSV set 21. Thickne~ of Permafrost 12408' MD /9058' TVD 12338' MD /9057' ~D YES ~ No ~~ 2198' feet MD 1900' (approx) 22. Type Electric or Other Logs Run MWD GR & Mem GR/Resistivi~ 23. CASING, LINER AND CEMENTING RECORD SE~ING DEPTH MD CASING SIZE ~. PER ~. GRADE TOP BO~OM HOLE SIZE CEME~ING RECORD AMOUNT PULLED 20" 91.5~ H-40 Surface 80' 30" 520 Sx AS II 13-3/8" 72~ L-80 Surface 2537' 17-1/2" 2200 Sx Fondu & 400 Sx PFC 9-5/8" 47~ L-80 & S00-95 Surface 10597' 12-1/4" 500 Sx Class G 7" 29~ L-80 10317' 11309' 8-1/2" 425 Sx Class G 3-1/2" x 2-7/8" 9.2~/6.16~ L-80 10298' 11397' 3-3/4" 17.5 bbls LARC 24. Pedorations open to Pmdu~ion (MD + TVD of Top and Bottom and 25. TUBING RECORD inte~al, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) (2" ca~iers, 4 SPF, & Zone 2A ) 5-1/2" 10293' 10282' 12000' - 12300' MD; 9056' - 9056' TVD 4-1/2" 10366' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See Sidetrack Su mma~ ~or details) 27. PRODUCTION TEST Date First Produ~ion Method of Operation (Flowing, gas lift, etc.) June 17, 2001 Flowing Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO 7/2/2001 3.3 Test Pedod >~ 22642 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (co~) Press. -1909 psi 24-Hour Rate > 1171 26514 341 28. CORE DATA Brief description of lithology, porosity, lractures, apparent dips and pressence of oil, gas or water. Submit core chips. .~ * This 10-407 is submitted as directed per the 10-401 form approved May 2a, 2001 (Permit ~201-099) ~ ~ o O Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE ORIGINAL :)mit in duplicate~ 29. I. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and MEAS. DEPTH TRUE VERT. DEPTH gravity, GOR, and time of each phase. Top of Zone 2A 11388' 9010' 31. LIST OF ATTACHMENTS Summary of 02-21^ CT Sidetrack Drilling Operations + End of Well Survey. 32. I hereby certify that the following is true and correct to the best of my knowledge. Signed ~ ~~ AD&W Coiled Tub n,q En,qineerMark Johnston Date Prepared by Paul Rauf 564-5799. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP AMOCO Page 1 of 1 Final Well/Event Summary Legal Well Name: 02-21A Common Well Name: 02-21A Event Name: REENTER+COMPLETE Start Date: 6/1/2001 End Date: DATE TMD 24 HOUR SUMMARY 6/1/2001 11,306.0 (ft) Released from well 2-01B MIRU on well 2-21 6/2/2001 11,306.0 (ft) NU and test BOP. 6/312001 11,475.0 (ft) Milled window 11,309'-11316'. Change out to mud & drilled to 11475' 6/4/2001 11,662.0 (ft) Complete build section. Cut 1180' off coil. Drill to 11662. POH Motor. 6/5/2001 11,662.0 (ft) Replaced coil tubing and reel. 6/6/2001 12,040.0 (ft) Drilled to 11898 OXP failed. CO OXP RIH. CO Gear box. drill to 11250'. 6/7/2001 12,408.0 (ft) Drilled to 12408. Called TD due to washout. 6/8/2001 12,408.0 (ft) Run and cemented liner. 6/9/2001 12,408.0 (ft) Made cleanout run thru liner PT liner lap OK. 6/10/2001 12,408.0 (ft) Tested liner lap 2000 psi. OK Ran CNL/CCL/GB. RIH to perforate 300' 6/11/2001 12,408.0 (ft) LD per guns and work string, freeze protect well and release. : Printed: 7'12012001 8:12:06 PM BP AMOCO Page 1 of 4 Operations Summary Report Legal Well Name: 02-21A Common Well Name: 02-21A Spud Date: 6/2/2001 Event Name: REENTER+COMPLETE Start: 6/1/2001 End: Contractor Name: NABORS Rig Release: 6/11/2001 Rig Name: NABORS 3S Rig Number: DS~f.4 Date From - To Hours Activity Code NPT Phase Description of Operations 6/1/2001 16:00 - 00:00 8.00 MOB P PRE Move rig and components from 2-3B. 6/2/2001 00:00 - 02:00 2.00 RIGU P PRE Install new tugger line, RU beaver slide, RU steam lines, 02:00 - 08:30 6.50 RIGU P PRE NU BOP. Rig accepted at 02:00, 6/02/2001. 08:30 - 10:00 1.50 RIGU P PRE Set test plug. 10:00 - 22:30 12.50 RIGU P PRE Pressure test BOPE. Witness waived by AOGCC inspector Chuck Scheve. Work on tank manifold valves. Grease all valves. 22:30 - 23:59 1.48 RIGU P PRE RU floor 6/3/2001 00:00 - 01:00 1.00 RIGU P PRE Change out packoff on injector head 01:00 - 01:30 0.50 RIGU P PRE Pre Spud meeting 01:30 - 02:10 0.67 STWHIP P WEXIT PT coil Connector & pump hard lines 02:10 - 03:10 1.00 STWHIP P WEXIT PU BHA#1 03:10 ~ 06:00 2.83 STWHIP P WEXIT RIH to whipstock. 06:00-11:45 5.75 STWHIP P WEXIT Tag whipstock at11324.6' ctm. 42k#upwt, 23k#rihwt. 2.5 bpm, 2000 ctp. See motor work and get slight over-pull. Begin milling operations. Stall once at 11324.9'. Resume milling working WOB to +6k#. Lack of progress @ 11328'. Rely on mechanical weight indicator and resume progress. Stalling @ 11331.6' (BO.W.) 11:45 - 12:15 0.50 STWHIP P WEXIT .~ Drill 10' open hole. 2.5 bpm, 2500# ctp, 19k# string weight, 1.5k# wob. 35 fph. 12:15 - 13:00 0.75 STWHIP P WEXIT Make 4 passes through window. Clean. Shut down pump and drift window. Clean. Pull up above window. Clean. Open circ sub. 13:00 - 15:30 2.50 STWHIP P WEXIT Pull out of hole. Bottoms up shows sand in returns. 15:30 - 16:35 1.08 DRILL P PROD1 Lay down BHA #1. Mill gauge 3.8". Note: Window mill was a rerun from a previous well. Gauged '{3.8" when ran in this well. M/U MO9 and 1.6 deg. MM. 16:35 - 18:40 2.08 DRILL P PROD1 RIH w/BHA #2. 64.79' OAL. to 10,800 tie in correct -21' 18:40 - 19:25 0.75 DRILL P PROD1 RIH to 11265 19:25 - 20:15 0.83 DRILL P PROD1 Circulate new mud to bit 20:15 - 23:59 3.73 DRILL P PROD1 Directionally drill to 11,475' wiper trip after making 150'. 6/4/2001 00:00 - 02:00 2.00 DRILL P PROD1 Directionally drill to 11522'. 02:00 - 02:20 0.33 DRILL P PROD1 Short trip 02:20 - 03:20 1.00 DRILL P PROD1 'Directionally drilling at 11,525, BH TubingPressure 5352 psi , ,BH annular pressure 4515 psi,Pump pressure 3485 psi ,ECD !9.7 @ 2.5 bpm 11525MD 8991 TVD. 20 fph. Drill to 11,565 end of build. 03:20- 06:45 3.42 DRILL P PROD1 POH 06:45 - 07:30 0.75 DRILL P PROD1 OOH. Discover kink in coil @ 1000'. Displace coil to KCL for cutting operation. 07:30 - 12:00 4.50 DRILL N PROD1 Cut 1170' of CTE in 17' sections. Kinked spot in the middle of a factory weld. Factory weld at 12,440 12:00 - 16:30 4.50 DRILL N : PROD1 Reverse circulate KCL out of coil with drilling mud for slack managemenet. Cut additional 60' looking for e-line. Put on nozzle. Pump in the hole, e-line to nozzle. Rehead OXP. 16:30 - 19:30 3.00 DRILL P PROD1 M/U BHA # 3 DS 49, 1.2 deg Xtreem motor with resistivity and OXP. OAL = 76.54'. Pump 30 Bbls toward connector. RIH. 19:30 - 22:00 2.50 DRILL P PROD1 Directionally drilling @ 11,578'MD, BH tubing pressure 5642 3si, BH annular pressure 4546 psi, pump presure 3586 psi @ Printed: 6/20/2001 11:04.:57 AM BP AMOCO Page 2 of 4 Operations Summa Report Legal Well Name: 02-21A Common Well Name: 02-21A Spud Date: 6/2/:2001 Event Name: REENTER+COMPLETE Start: 6/1/2001 End: Contractor Name: NABORS Rig Release: 6/11/2001 Rig Name: NABORS 3S Rig Number: DS~f-4 Date From - To Hours Activity Code NPT Phase Description of Operations 6/4/2001 19:30 - 22:00 2.50 DRILL P PROD1 2.5 BPM ECD 9.6 ppg, Drill to 11662'. Motor week stalling at 400# dp. HOT ~ 8995' 'I'VD. 22:00 - 23:59 1.98 DRILL N DFAL PROD1 POH. Pin hole leak @ 5380 identified. POH circulaing across the top of the hole. 6/5/2001 00:00 - 01:30 1.50 DRILL N DFAL PROD1 Continue to POH circulating across the top of the well. 01:30 - 03:30 2.00 DRILL N DFAL PROD1 Lay down BH^. DS 49 bit in good shape. Xtreem motor had 160 hours on it. Sending in for inspection. 03:30 - 06:30 3.00 DRILL N SFAL PROD1 Blow down reel w/N2. Remove collector. 06:30 - 11:30 5.00 DRILL N SFAL PROD1 Pull reel from coil unit. !11:30 - 12:45 1.25 DRILL N SFAL PROD1 Cut and weld bracket for collector. 12:45 - 14:30 1.75 DRILL N SFAL PROD1 Cut holes for reel support safety pins. 14:30- 15:00 0.50 DRILL N SFAL PROD1 Set reel into coil unit. 15:00 - 19:30 4.50 DRILL N SFAL PROD1 Install collector, stab pipe into injector. 19:30 - 20:00 0.50 DRILL N SFAL PROD1 PU injector to floor 20:00 - 21:00 1.00 DRILL N SFAL PROD1 Change backoff and brass 21:00 - 23:50 2.83 DRILL N SFAL PROD1 Start heading up, pull test connector. 23:50- 23:59 0.15 DRILL N SFAL PROD1 Pressure test connector. 6/6/2001 00:00 - 06:30 6.50 DRILL N SFAL PROD1 RIH tie in @ 10810 -17' correction. RIH to 11662. 06:30 - 07:00 0.50 DRILL P PROD1 Directionally drill @11700 BH coil pressure 5033 psi, BH annular pressure 4556 psi, ECD 9.6 Pu to 11660 to log down. 07:00 - 09:20 2.33 DRILL P PROD1 Drill to 11,815. Wiper trip 09:20 - 10:45 1.42 DRILL P PROD1 Drill to 11,898' OXP failed. 10:45- 13:20 2.58 DRILL N DFAL PROD1 POH 13:20 - 14:50 1.50 DRILL N DFAL PROD1 Change out OXP and test tool. 14:50- 15:26 0.60 DRILL N DFAL PROD1 RIH 15:26 - 15:40 0.23 DRILL N RREP PROD1 At 1818 shut down reel making noise. Wait on mechanic. 15:40 - 18:30 2.83 DRILL N DFAL PROD1 RIH to 10800' and tie in correction -21'. 18:30 - 22:00 3.50 DRILL P PROD1 RIH drill ahead to 12,040'. 22:00 - 22:15 0.25 DRILL P PROD1 Short trip to window. 22:15 - 23:59 1.73 DRILL N RREP PROD1 Pull into casing. Circulate thru circ sub while changing out gear box on reel. 6/7/2001 00:00- 02:20 2.33 DRILL N RREP PROD1 Repair gear box 02:20- 02:45 0.42 DRILL N DFAL PROD1 RIH to 11250 02:45 - 07:00 4.25 DRILL P PROD1 Directionally drill to 12240. 07:00 - 08:15 1.25 DRILL P PROD1 Wiper trip 920'. 08:15 - 13:38 5.38 DRILL P PROD1 Directionally drill to 12399. 13:38-15:00 1.37 DRILL P PROD1 Wipertrip 1100'. 15:00 - 15:53 0.88 DRILL P PROD1 Poor drilling performance. Called TD in lieu of tripping for BHA. Untimately discovered washout in release tool. 15:53 - 16:30 0.62 DRILL P PROD1 Tie in log +13 16:30 - 17:30 1.00 DRILL P PROD1 RIH confirm TD. Condition hole TD = 12,408' 17:30 - 18:00 0.50 DRILL P PROD1 Back ream 1100' 18:00 - 18:30 0.50 DRILL P PROD1 RIH pump new mud. 18:30 - 19:00 0.50 DRILL P PROD1 Lay in new mud 12408 to 11250 19:00 - 21:30 2.50 DRILL P PROD1 Open circulating sub and condition hole. POH 21:30 - 23:15 1.75 DRILL P PROD1 i Set injector on deck. :23:15 - 23:59 0.73 DRILL N HMAN PROD1 Cut coil unable to get all the pipe back on reel. Cut and ' laydown 200'. '6/8/2001 I00:00- 00:50 0.83 DRILL P PROD1 LD BHA '00:50 - 01:45 0.92 CASE P LNR1 Unstab e-line injector : 01:45 - 04:45 3.00 CASE P LNR1 Install injector head. Stab pipe from ROC. Printed: 6/20/2001 11:04:57 AM BP AMOCO Page 3 of 4 Operations Summary Report Legal Well Name: 02-21A Common Well Name: 02-21A Spud Date: 6/2/2001 Event Name: REENTER+COMPLETE Start: 6/1/2001 End: Contractor Name: NABORS Rig Release: 6/11/2001 Rig Name: NABORS 3S Rig Number: DS~f.4 Date From - To Hours Activity Code NPT Phase Description of Operations 6/8/2001 04:45 - 05:00 0.25 CASE P LNR1 I PJSM 05:00 - 10:00 5.00 CASE P LNR1 I PU 2-7/8 x 3-1/2" liner 10:00 - 11:00 1.00 CASE P LNR1 PU 6 drill collars 11:00 - 11:40 0.67 CASE P LNR1 PU injector head. Swap pressure sensor to ROC. PT coil and hard lines 11:40 - 12:00 0.33 CASE P LNR1 Displace freeze protection from ROC 12:00 - 15:00 3.00 CASE P LNR1 Run liner to TD. Minimum pipe weight 20,000#. PU wt 43,700# 15:00 - 15:30 0.50 CASE P LNR1 Drop ball. :15:30 - 17:40 2.17 CASE P LNR1 Circulate ball to seat. Release from liner hanger. ! 17:40 - 19:45 2.08 CASE P LNR1 Change well over to KCL water 19:45 - 20:30 0.75 CASE P LNR1 Batch mix 20 bbl cement 20:30 - 21:00 0.50 CASE P LNR1 Pump 5 bbl H20. PT lines. Pump17.5 bbls cement diplace with KCL water + bio 21:00 - 21:37 0.62 CASE P LNR1 Install dart. Flush lines between reel and micro motion flow meter. Pressure 170 psi and kick out dart Pump .2 bbl Shut down and confirm the dart was pumped into reel. Displace dart @ 2.4 bpm at 2000 psi. Dart landed in wiper plug .6 bbl early and sheared liner wiper plug with 3100 psi. displaced 14.9 bbl bump plug. Floats held. 100% returns through job. Return micromotion confirm the cement volume gain. 21:37 - 23:59 2.37 CASE P LNR1 PU and circulate and POH 6/9/2001 00:00 - 02:20 2.33 CASE P COMP LD collars and liner running tool. Jet out BOP stack. 02:20 - 11:45 9.42 CASE P COMP Weekly BOP test. AOGCC John Crisp waived witnessing test 1700 hrs 6-8-01 11:45 - 12:00 0.25 CASE P COMP PJSM PU hydril Stinger and motor for cleanout. 12:00 - 14:30 2.50 CASE P COMP PU and RIH with CH Hydril 14:30 - 15:30 1.00 CASE N RREP COMP Wait on new elevators old ones determined to be unsafe 15:30 - 16:00 0.50 CASE P COMP Continue to Pu CS Hydril 16:00 - 20:45 4.75 CASE P COMP RIH to landing collar. Tagged and drill thru a couple of intervals between 11500 and 11600. Tag up appeared to be drilling on rubber i.e. wiper plug. 20:45 - 23:30 2.75 CASE P COMP Pull out to 10250. Drop ball and open circulation sub. POH to Hydrill 23:30 - 23:59 0.48 CASE P COMP Pressure test liner and liner lap to 2000 psi. O.K. 6/10/2001 00:00 - 02:30 2.50. CASE P COMP Stand back 1-1/4 Hydril tubing. 02:30 - 03:00 0.50, CASE P COMP PJSM for logging operation CNL/CCL,GR 03:00 - 04:30 1.50' CASE P COMP RIH conveying logging tools on Hyrdil work string I PU head and change crews. 04:30 - 06:00 1.50 CASE P COMP i RiHinjector 06:00 - 08:00 2.00 CASE P COMP to 10200'. 08:00 - 08:30 0.50 CASE P COMP iWait on logging operator. He is silmutaneously running logs for ; Nortec 08:30 - 10:15 1.75 CASE P COMP RIH logging. 10:15 - 11:22 1.12 CASE P COMP POH logging and laying on new mud in liner. 11:22 - 13:22 2.00 CASE P COMP POH and standback injector 13:22 - 15:30 2.13 CASE P COMP POH standing back Hydril tubing 15:30 - 16:00 0.50 CASE P COMP Lay down source 16:00 - 22:00 6.00 CASE P !COMP Wait on confirmation of perforating interval and availibility of perforating hand who is running a job simultaneously for Nortec. 22:00 - 23:00 1.00 CASE P =COMP PU 300' 2" perforating guns to shoot 12,000 to 12,300'. 23:00 - 23:59 0.98 CASE P COMP RIH on Hydril tubing. 6/11/2001 00:00 - 00:45 0.75 CASE P COMP PU injector head 00:45 - 01:30 0.75 CASE P COMP RIH with perforating guns Printed: 6/20/2001 11:04:57 AM BP AMOCO Page 4 of 4 Operations Summary Report Legal Well Name: 02-21A Common Well Name: 02-21A Spud Date: 6/2/2001 Event Name: REENTER+COMPLETE Start: 6/1/2001 End: Contractor Name: NABORS Rig Release: 6/11/2001 Rig Name: NABORS 3S Rig Number: DS~-4 Date From - To Hours Activity Code NPT Phase Description of Operations 6/11/2001 01:30 - 04:00 2.50 CASE P COMP Pump ball down and fire guns 04:00 - 06:00 2.00 CASE P COMP POH with coil. 06:00 - 06:30 0.50 CASE P COMP Strip injector off well head. 06:30 - 11:00 4.50 CASE P COMP LD CS Hydril work string and perforating guns 11:00 - 11:30 0.50 CASE P COMP RD floor 11:30 - 13:00 1.50 CASE P COMP Freeze protect to 2150' with 50 bbl methanol. 13:00 - 15:00 2.00 CASE P COMP Wait on field crew to set BPV. 15:00 - 15:30 0.50 CASE P COMP Set BPV 15:30 ~ 16:30 1.00, CASE P COMP Unstab ROC 16:30 - 18:00 1.50, CASE P COMP ND BOP 18:00 - 20:00 2.00 CASE P COMP Clean pits 20:00 - 23:00 3.00 CASE P COMP NU tree and test Printed: 6/20/2001 11:04:57 AM TREE = FMC G EN WELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV = 64' BF. F_LEV = ? KOP = 2900' Max An~lle = 95 (~ 11720' Datum MD = 11180' Datum TVD -- 8800' SS 02-21A SAFETY NOTES: OGLV STUCK IN GLM#1, TxlA COrv/vl, CONTROL LINE BAD. WELL EXCEEDS 70° @ 11460' A ND GOES HORIZONTAL @ 11550'. 2198' H5-1/2'' CAMBAL-OSSSV NIP, ID= 4.56Z'I GAS LIFT MANDRELS I13-3/8" CSG, 72#, L-80, ID=12.347" H 2537' IMinimum ID = 2.37" @ 1 1360' 3-1/2"X 2-7/8" LNR XO I5-1/2" TBG-FC, 17#, L-80, .0232 bpf, ID =4.89Z' H ITOPOF 4-1/2" TBG-PC H ITOPOF BKR LNR HGR H 10293' 10293' I 10317' I4-1/2"TB~FC, 12.6#, h~80, .0152 bpf, ID = 3.958" H 10366' I .,8. CSG, 47#, L-80, ID = 8.681" H 10597' PERFORATION SUMMARY REF LOG: SWS MEM GFUCNL ON 06/10/01 ANGLEATTOP PERF: 92' @ 12000' Note: Refer to Production DB for historical ~erf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 11250 - 11255 S 05/27/01 3-3/8" 6 11256 - 11260 S 05/27/01 3-3/8" 6 11304- 11350 S 05/27/01 3-3/8" 6 11350 - 11365 S 05/27/01 3-3/8" 4 11380- 11390 S 05/27/01 3-3/8" 6 11402- 11406 S 05/27/01 3-3/8" 4 11416- 11430 S 05/27/01 3-3/8" 4 11436- 11454 S 05/27/01 2" 4 12000 - 12300 O 06/11/01 17" LNP,, 29~, L-80, .0371 bpf, ID= H 11627' 11632' I 10266' 10282' 10293' 10298' 10353' I 10364' I-~5-11Z' BAKER PBRASSY I H 5,8,, X 5-1/2" BAKERSAB FKRID =4.012" Id~1/2" X 4-1/2" XO I I--~3.70"BKR DEPLOY SLEEVE, ID =3.00" I 1 1/2" CAM DB-6 LANDING NP, ID-- 3.813-I i--I BAKER SHEAROUT SUB I 10366' 1 1/2" TUBINGTAIL I I 10374' 11360' I~IELMD TTLOGGED05/05/821 I 7" MILLOUT WINDOW i I 11309'- 11316' ~1/2" LNR, 9.2#, TC2 X 2-7/8" I I LNR, 6.16#, XO, ID= 2.37" --I 12338' 2-7/8" LNR, 6.16#, L-80, 12371' I STL, .0058 bpf, ID = 2.37" DATE REV BY COMMENTS DATE REV BY COMMENTS 05/02/82 ORIGINAL COrvPLETION 05/30/01 ROY/tlh CORRECTED PERFS 12/27/00 SlS-SLT CONVERTED TO CANVAS 06/11/01 /th GLV CORRECTIONS 02/02/01 SlS-LG F;~'VlSlON 06/11/01 CTD SIDETRACK 04/18/01 RN/tlh CORRECTIONS 06/25/01 CHfTP CORRECTIONS 05/26/01 JLJ/tlh SET WHIPSTOCK PRUDHOE BAY UNFF WELL: 02-21A PERMIT No: 201-099 AFl No: 50-029-20781-01 SEC36, T11N, R14E 880.83 FEL 929.1 1 FIXI. BP Exploration (Alas ka) BP Amoco Baker Hughes INTEQ Survey Report 1NYEQ Company: BP Amoco Fidd: Prudhoe Bay Site: PB DS 02 Well: 02-21 Wellpath: 02-21A Date: 6/19/2001 Time: 13'90:33 Page: 1 Co-ordilate(NE) Reference: Well: 02-21, True North Vertical (TVD) Reference: 47: 21 411311982 00:00 64.0 Section (VS) Reference: Well (0.00N,0.00E, 136.17Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: BGGM2001 Site: PB DS 02 TR-11-14 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5948800.37 ft Latitude: 70 15 53.847 N 687638.44 ff Longitude: 148 28 58.060 W North Reference: True Grid Convergence: 1.43 deg Well: 02-21 Slot Name: 21 02-21 Well Position: +N/-S 247.37 ft Northlng: 5949028.99 ft Latitude: 70 15 56.280 N +E/-W -748.72 ft Easting: 686883.83 ft Longitude: 148 29 19.851 W Position Uncertainty: 0.00 ff Wellpath: 02-21A Drilled From: 02-21 500292078101 Tie-on Depth: 11306.00 ft Current Datum: 47: 21 4/13/1982 00:00 Height 64.00 ft Above System Datum: Mean Sea Level Magnetic Data: 4/20/2001 Declination: 26.79 deg Field Strength: 57487 nT Mag Dip Angle: 80.78 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ff ff ff deg 0,00 0,00 0.00 136.17 Survey: MWD Start Date: 6/7/2001 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Annotation MD TVD 11306.00 8957.17 KOP 12408.00 9058.14 Projected to TD Survey MD Incl Azlm TVD ' sSTVD N/S E/W MapN MapE DLS VS fi: deg deg ff . ft . ff ff' :fi ft deg/100ff ft 11306.00 42.08 142.31 8957.17 8893.17 -3887.74 4160.68 5945245.96 691139.48 0.00 5685.97 ! 1340.00 48.40 142.40 8981.10 8917.10 -3906,85 4175.42 5945227.23 691154.69 18.59 5709.95 11370.00 54.20 142.50 8999,85 8935.85 -3925.40 4189.68 5945209.03 691169.41 19.34 '5733.22 11400.00 59.40 144.80 9016.27 8952.27 -3945.62 4204.54 5945189.19 691184.76 18.48 5758.09 11430.00 65.20 140,00 9030.22 8966.22 -3966.63 4220.76 5945168.59 691201.49 23.96 5784.48 11460.00 71.00 140,30 9041.40 8977.40 -3987.99 4238.59 5945147.68 691219.85 19.36 5812.24 11490.00 77.70 143.30 9049.49 8985.49 -4010.68 4256.43 5945125.44 691238.24 24.32 5640.96 11520.00 83.60 144.30 9054,37 8990.37 -4034.56 4273.90 5945102.01 691256.30 19.94 5870.29 11550,00 88.10 147.00 9056.54 8992.54 -4059.26 4290.78 5945077.74 691273,79 17.48 5899.79 11 580.00 87.30 147.30 9057.74 8993.74 -4064.44 4307.04 5945052.97 691290.67 2.85 5929.22 11610.00 86.70 147.50 9059.31 8995.31 -4109.68 4323.18 5945028.14 691307.43 2.11 5958.60 11630.00 88.40 154.90 9060.17 8996.17 -4127.17 4332.80 5945010.89 691317.48 37.93 5977.89 11681,00 91.20 160.00 9060.28 8996.28 -4155.79 4344.68 5944982.58 691330.06 18.77 6006.76 11689.00 93.70 163.50 9059.08 8995.08 -4182.35 4353.44 5944956.24 691339.48 15.35 6031.99 11720.00 94.60 166.60 9056.83 8992.83 -421~2.22 4361.41 5944926.58 691348.19 10.39 6059.06 11750.00 94.30 170.40 9054.51 8990.51 -4241.52 4367.37 5944897.44 691354.88 12.67 6084.32 11780.00 92.50 170.70 9052.73 8988.73 -4271.06 4372.29 5944868.03 691360.53 6.08 6109.04 11810.00 90.50 169.70 9051.94 8987.94 -4300.61 4377.40 5944838.62 691366,37 7.45 6133.89 BP Amoco Baker Hughes INTEQ Survey Report Compaay: BP Amoco Date: 6/19/2001 Time: 13:20:33 Page: 2 Field: Prudhoe Bay Co-ordMate(NE) Referenge: Well: 02-21, True North Site: PB DS 02 Vertical ('1%~) Reference: 47: 21 411311982 00:00 64.0 Well: 02-21 Sectlen (rS) l~fereKe: Well (0.00N,0.00E,136.17Azi) Wellpa~: 02-21A Slr~ey Cnknlatiea Me, ed: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD S~TVD N/S E/W MapN MapE DLS VS ff deg deg ff ff ff ff ff ff deg/100ff ff 11840.00 89.40 166.80 9051.97 8987.97 -4329.98 4383.50 5944809.41 691373.20 10.34 6159.31 11870.00 86.70 165.20 9052.99 8988.99 -4359.07 4390.76 5944780.52 691381.17 10.46 6185.31 11900.00 86.40 160.80 9054.79 8990.79 -4387.70 4399.51 5944752.11 691390.63 14.67 6212.03 11930.00 87.10 157.90 9056.50 8992.50 -4415.72 4410.07 5944724.36 691401.89 9.93 6239.56 11960.00 91.20 156.80 9056.94 8992.94 -4443,40 4421.62 5944696.98 691414.12 14.15 6267.52 11990.00 91.40 152.70 9056,26 8992.26 -4470.52 4434.41 5944670.19 691427.58 13.68 6295.95 12020.00 91.90 148.40 9055.40 8991.40 -4496.63 4449.15 5944644.46 691442.96 14.42 6324.99 12050.00 91.00 144.40 9054.64 8990.64 -4521.60 4465.74 5944619.90 691460.17 13.66 6354.50 12080.00 90.30 139.60 9054.30 8990.30 -4545.23 4484.21 5944596.74 691479.21 16.17 6384.33 12110.00 90.30 134.70 9054.14 8990.14 -4567.22 4504.60 5944575.27 691500.14 16.33 6414.32 12140.00 89.00 129.60 9054.32 8990.32 -4587.35 4526.84 5944555.70 691522.87 17.54 6444.23 12169.00 89.40 123,70 9054.73 8990.73 -4604.65 4550.09 5944538.98 691546.54 20.39 6472.82 12199.00 89.20 119.90 9055.09 8991.09 -4620.45 4575.58 5944523.82 691572.42 12.68 6501.87 12229.00 89.80 122.70 9055.36 8991.36 -4636.04 4601.21 5944508.88 691598.42 9.54 6530.86 12260.00 90.50 126.30 9055.27 8991.27 -4653.59 4626.75 5944491.96 691624.39 11.83 6561.22 12291.00 88.90 133.90 9055.44 8991.44 -4673.54 4650.45 5944472.60 691648.57 25.05 6592.02 12321.00 88.50 138.10 9056.12 8992.12 -4695.11 4671.28 5944451.56 691669.93 14.06 6622.00 12350.00 88.70 142.70 9056.83 8992.83 -4717.45 4689.75 5944429.69 691688.95 15.87 6650.91 12408.00 88.70 142.70 9058.14 8994.14 -4763.57 4724.89 5944384.46 691725.23 0.00 6708.52 ~P Ar~oco ~EFERENCF iNFORMATION ;o.ortl, ma~e ~N/L Re~ereuce We][Centre 02-~ ] u~e Nail ~/enlca! HVD~ Relerence SYstem Mean Sea beve Se¢8on [VS Re~¢renc~ Sbt 21 (0 00N 0 00~ Measured Depth Reference 47 21 4/13/1982 00 O( 64 00 Ca~culat~n Methoc Minimum ;u~ature 8460 8500 3600 3/00 3900 4000 .r; 5800 3(~8(~ 3108 3200 330O 3400 3500 3600 3700 3800 39f~0 4000 4~00 4200 4300 4400 4500 4600 4?00 4800 49O0 5OOO 5~00 5200 5300 540O 55OO 560O West(~}/East(+} [lOOft/in] 5400 5450 5500 555~ 5600 5650 5700 5750 5800 b050 5900 5950 6000 6060 0100 6150 6200 625( 8300 6350 6400 6450 6500 6550 6600 6850 8700 6750 6600 6850 6900 6950 7000 7050 ¢100 7150 7200 7250 7 ~19/200~ 1:22 PM AI,ASI~k OIL AND GAS CO~SERYATIO$ COM)IISSIO$ TONY KNOWLES, GOVERNOR 333 W. 7'r" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Mark Johnson CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage AK 99519-99519 Re: Prudhoe Bay Unit 02-21A BP Exploration (Alaska) Inc. Permit No: 201-099 Sur Loc: 2153' SNL, 5177' WEL, SEC. 36, T1 IN, R14E, UM Btmhole Loc. 1771' SNL, 457' WEL, SEC. 01, T10N, R14E, UM Dear Mr. Johnson: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Commissioner BY ORDER OF THE COMMISSION DATED this ~ f~/day of May, 2001 jjc/Enclosures CC: Department ofFish & Game, Habitat Section w/o enCl. Department of Environmental Conservation w/o encl. (j STATE OF ALASKA " J ALASKA IL AND GAS CONSERVATION COM,v,,,.,,51ON PERMIT TO DRILL 20 AAC 25.005 I [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [][] Re-EntryDrill [][] RedrillDeepen 1 b. Type of well [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. . RKB = 64' Prudhoe Bay Field / Prudhoe 13. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028311 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2153' SNL, 5177' WEL, SEC. 36, T11N, R14E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 480' SNL, 1238' WEL, SEC. 01, T10N, R14E, UM 02-21A Number 2S100302630-277 At total depth 9. Approximate spud date 1771' SNL, 457' WEL, SEC. 01, T10N, R14E, UM 06/01/01 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028329, 457' MDI No Close Approach 2560 12525' MD / 8994' TVDss 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 11330' MD Maximum Hole Angle 90 ° Maximum surface 2270 psig, At total depth (TVD) 9000' / 3350 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casin.q Weight Grade Couplin.q Lenqth MD TVD MD TVD (include stage data) 3-3/4" 3-1/2"x2-7/8. 4.6# L-80 ST-L 2205' 10320' 8178' 12525' 8994' 78 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. I~'\ iL Present well condition summary Total depth: measured 11632 feet Plugs (measured) PBTD tagged at 11472' (0~.../~0).1 !!?: ,4001 true vertical 9200 feet Effective depth: measured 11472 feet Junk (measured) ~l~Sl(~'~ 0it & true vertical 9081 feet Casing Length Size Cemented MD TVD Structural Conductor 80' 20" 520 sx Arcticset II 80' 80' Surface 2473' 13-3/8" 2200 sx Fondu, 400 sx Permafrost 'C' 2537' 2537' Intermediate Production 10533' 9-5/8" 500 sx Class 'G' 10597' 8444' Liner 1310' 7" 425 sx Class 'G' 10317' - 11627' 8239' - 9196' Perforation depth: measured Open: 11250'- 11260', 11355'- 11365', 11402'- 11406', 11416'- 11430', 11436' - 11454' Sqzd: 11304' - 11355', 11380' - 11390' true vertical Open: 8916' - 8923', 8994' - 9001', 9029' - 9032', 9039' - 9050', 9054' - 9068' Sqzd: 8956' - 8994', 9020' - 9020' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Mark Johnson, 564-5666 Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing i~true and correct to the best of my knowledge Signed Mark Johnson Title CT Drilling Engineer Date ~-- ' · '. '.:.':" '....!' .. '..." :' .. · .. :.":.....:':::....'. ..... .....:".. :..':':."..'..':. ?" ;' .: :. .'i'.corn'mission':':use:.onl~. ': ..~....: ..."..": : :...: ':. ?. .:..: . :. '..:.. :.:.:. ':: .... '.......':... '.: :". :.. "...: :: .'..':. Permit Number 'IAPl'Number ......I' APproval Daie'"' 'ISee coverletter' ..~_.<::3/'-' (:~ ~.~' 150-029-20781-01I~, '~-'~ '22' ~ I I for other requirements Conditions of Approval: Samples Required [] Yes ]~ No Mud Log Required [] Yes [] No Hydrogen Sulfide Measures ]~]Yes [] No Directional Survey Required ~ Yes [] No Required Working Pressure for BOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K ,,~,.3.5K psi for CTU Other: ",q, IGINAL SIGNED BY by order of ..Approved By ' :~Vinr ~¢~rnn,,rllr~.~ ,r'~, .~"~ , I~ ~, , Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate BP 02-21a Sidetrack Summary of Operations: 02-21 is a conventional Zone 2 producer that is being sidetracked due to high GOR. 02-21a will exit the existing 7" liner and drill approx. 1,225' into the 21P and 22P sands. The sidetrack will be completed with a fully cemented 3 1/2" x 2 7/8" liner. Phase 1: Set whipstock and squeeze perfs. Planned for May 26-28, 2001 · The IA will be liquid packed and an MIT test performed. · E-line will set a whipstock at approx. 11,306'. · Service coil will use approx. 30 bbls cement to squeeze existing perfs. Phase 2: Mill window, Drill and Complete sidetrack: Planned for June 1, 2001. Drilling coil will be used to mill the window and drill the directional hole per attached plan. The sidetrack will be completed with a cemented liner. Phase 3: Install tubing patch Planned to follow the coil sidetrack operation. Mud Program: · Phase 1: Seawater · Phase 2: FIo-Pro (8.6 - 8.7 ppg) Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · A combination 3 Y2" x 2 7/8" liner will be cemented to approx. 200 ft above the window with a minimum of 16 bbls cement. The top of the 3 Y2" liner will be inside the existing 4 Y2" tailpipe at approx. 10,320'. Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2000 psi. Directional · See attached directional plan. Max. hole angle is 90 deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · An MWD Gamma Ray/Resistivity log will be run over all of the open hole section. A Memory CNL will be run inside the liner. Hazards The highest H2S recorded to date on DS 02 is 8 ppm. Lost circulation risk is Iow as no fault crossings are expected. Reservoir Pressure Res. press, is estimated to be 3350 psi at 9000ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 2,270 psi. TREE = FMC GEN WELLHEAD= FMC ACTUATOR= KB. FIEV = 64' BF. ELEV = ? KOP = 2900' '~'X~'i~'~ ........... ~'i~'"~'"~§i~'6; Datum MD = 11180" ..................................................................................... Datum TVD= 8800' SS 02-21A PROPOSED CTD SIDETRACK 2198' J 13-3/8" CSG, 72#, L-80, ID = 12.347" Jd 2537' JMinimum ID = 3.813" @ 10353' J 4-1/2" Camco DB-6 Landing NIP J5-112" 'I'BG-PC, 17#, L-80, .0232 bpf, ID = 4.892" H TOPOF 4-1/2" TBG-PC Id 10293' 10293' ITOPOF 7" LNR Jd 10317' J 4-1/2" 'rBG-PC, 12.6~, N-80, .0152 bpf, ID = 3.958" 10366' 10597' 10266' 10282' 10293' 10320' 10353' J 10364' 10366' J 10374' Jl 5-1/2" CAM BAL-O SSSV NIP, ID = 4.562" I GAS LIFT MANDRELS TYPE MAN CA CA CA CA CA CA CA CA CA CA I J--JTop of 3-1/2" Proposed Liner J--~4-1/2" CAM DB-6 LANDING NIP, ID = 3.813" J I---JELMD- LOGGED 5/5/821 J Mill Window off Mechanical Whipstock Jd 11330' 11390 J'--'J 3'1/2" to 2-7/8" XOI PERFORATION SUMMARY REF LOG: BHCS on 4/27/1982 ANGLE AT TOP PERF: 42'@ 11250' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3 3/8" 4 11250-11255 C 08/30/92 3 3/8" I 11255-11260 C 11/10/89 3 3/8" 4 11255-11260 C 08/30/92 3 3/8" 6 11256-11260 O 07/10/00 3 3/8" 6 11350-11365 O 04/01/01 3 3/8" 4 11355-11365 C 08/30/92 3 3/8" 6 11402-11406 O 08/09/93 3 3/8" 4 11416-11430 O 11/24/89 3 3/8" 4 11436-11454 O 11/24/89 J 7" LNR, 29#, L-80, .0371 bpf, ID=6.184"ld 11627' ['~-~--[ 11632' I DATE REV BY COMMENTS DATE REV BY COMMENTS 05/02182 ORIGINAL COMPLETION 12/27/00 SIS-SLT CONVERTED TO CANVAS 02/02/01 SIS-LG REVISION 04/18/01 RN/tlh CORRECTIONS 04/20/01 pcr proposed ST 3-3/4" Open Hole J2-7/8" 4.6# L-80 LINER, Cemented & Perforated P&A'd w/Cement J PRUDHOE BAY UNIT WELL: 02-21A Proposed ST PERMIT No: 82-045 APl No: 50-029-20781-00 SEC 36, T11N, R14E 881 FEL 929 FNL BP Exploration (Alaska) BP Amoco REFERENCE INFORMATION C,o~mate (NIE) Re~: We~ Ce~l~e: 02-21, Tree North Vertical ~/D) Reference: System: Mea~ S~a Level Section 0/S) Re~ere~ce: Slot ~ 21 (0.00N,0.006) Meas~ Del:~h Re[emnce.' 47:21 4/13/19~2 00:00 64.00 Mir~num Curvature Obp LEGEND 02-~1 (02-21) Plar~l 02-21A Pta~ #1 T Azimuths to True North Magnetic North: 26.79° Magnetic Field Strength: 57487nT Dip Angle: 80.78° Date: 4/20/2001 Model: BGGM2000 P~an: Plan ~ (02-21/Plan~ 02-21A) Created By:. B~ PolnisDate;. 4r20,r2001 E-I ..*-a il br:i potn;s~inteq.com Braker ?i~§hes iNTEQ: (907) 267-6600 ............... ~'."' '~ " · .. ~ .. - ! .; :.' -:' . !':.':" ~ -4100' ';-'"'""':'""'~ .......... '"~"'~"~"~ ':",-'-'.'~v~-?:-::"~-':-:'":'":'!'":~: '''' :"' ~ · .. :~.....;...::~_....~...;...:.... C~ 4200' +-"--'"'-h:::~::'::'.:.:'7:::~':'~";'.~!~.;":."F:.-?'y'""'?';"':i:;i: ...... ?.-4300" '!-"'"i'":.'"7!":'!"";"!'!'!'i' ;' !'! ;?'i':!-'!": .......... !'"'":'";'i- ~' ~ "~ *~' ~'~ ,-.. -~ 1;~'; :.';.~ ........... ;..'...:..---.{;- 1~ -;....~ .. :.......'.,~.'.-.:.:;. ; ".' ~'- -4500-~_ '~'"":'">'""C: ............. :;";S'.! ~. !:'Z Z~ '"-'~'~';';7"::'"':';':'''''i''';:''''''~ ..... ¢l nl .... . .... [-~ i-:':':.~:: :-.".-i::.'-~:-'--:-;..?-;-;-;-:?::--;-:--,--i:::?:--!.-!~.~..i'/..-- ~' :'~ ~ :;:' :~;:":';'":'~"~'~"~':'"""~ ' ?' '":' ":' ....... :' ' :~:::' ' -!-'!':':i"i :' .'.:.:i..:'... {. '. ' ~. M~ -470(~_ ";':' ~ "':'"c i' ? ".'"'.'"/'i'";"';'"'""'!'""'¥:"::.-;-:2 '"'F'''!'''': ':" :; ':. ...... ; · . ~ -5~00"~ ' -5300'"'! ' .::_:'i:~:'!i:;-~ ' ::":'"' :!"' ' '~ .......... ~ ......... · 't ..... r'r ...................... ~ ~ ~ i i - : t · '¢'~'~' .'.'?r?..'-;"r':-r'r'..' , .' , ! , I , ' ! .... ] .... I t ....I" ' I '' I ' ' ] ' I .... 3200 3300 3400 3.500 3600 3700 ~ 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000 5100 5200 5300 5400 5500 5600 5700 5800 · West(-)/East(+) [lOOft/in] . %. 'N . Z · In79t(o)~111 ' ' ' : · : Z ~ [ · ..~ ......~ .... ~. ·..~ _- . ..! .:...;...;..!.....:::. ! ............................... .~.~.?r.`.~.~-.q..~.`-`~`.F`~.`` `-~.. ~.~.~ ~-~.~.r`.~.m.~..~.~7~.`.`~.'-r~.??~T.`*~.~-r~1~.?~w.~.~?r~-~~m~® i ' , " i ' 5350 5400 5450 5500 5550 5~30 5650 5700 5750 5800 5850 55K)0 5950 60tX) 6050 6100 6150 6200 6256 6300 6350 6400 6450 6500 6550 CvS(X) 6656 0700 6750 6800 6850 6900 0950 7000 7050 7100 7150 7200 Vertical Section at 136,02° [SOft/in] 4/20/2001 11:26 AM BP Amoco Baker Hughes INTEQ Planning Report i'~-:.i~'[~Q- ............. Company: BP Amoco Date: 4/20/2001 Time: 11:06:10 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 02-21, True North Site: PB DS 02 Vertical (TVD) Reference: System: Mean Sea Level Well: 02-21 Section (VS) Reference: Well (0.00N,0.00E,136.02Azi) Wellpath: Plan#1 02-21A Survey Calculation Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: BGGM2000 Site: PB DS 02 TR-11-14 UNITED STATES · North Slope Site Position: Northing: 5948800.37 ft Latitude: 70 15 53.847 N From: Map Easting: 687638.44 ft Longitude: 148 28 58.060 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 1.43 deg Well: 02-21 Slot Name: 21 02-21 Well Position: +N/-S 247.37 ft Northing: 5949028,99 ft Latitude: 70 15 56.280 N +E/-W -748.72 ft Easting: 686883.83 ft Longitude: 148 29 19.851 W Position Uncertainty: 0.00 ft Wellpath: Plan#1 02-21A Drilled From: 02-21 500292078101 Tie-on Depth: 11330.00 ft Current Datum: 47 ' 21 4/13/1982 00:00 Height 64.00 ft Above System Datum: Mean Sea Level Magnetic Data: 4/20/2001 Declination: 26.79 deg Field Strength: 57487 nT Mag Dip Angle: 80.78 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 0.00 0.00 0.00 136.02 -"~i;~ ......... -b~-~ .......................................................................... ~-;-t~"-~m'~-;;~-~- ......... ~/-~'i- .............................................................. Lamar's Plan #1 Version: 1 I Principal: Yes Tied-to: From' Definitive Path Targets ........... : ....... :._._:._...: ............ :....-~ ....... -7.~- .......... : ............. :..-: ........ :..¥___-:- .......... _~________~:_~ . ...... ~-:.__: .................. : ....... : ................................................................................... : ............................................. ... · Map Map · <---- LatitUde ----> <-- Longitude .---> · Name. .. DescriPtion: · ' :TVD ' '+N/is ': +E/-W' .. ' Northing Eastlng' .. Deg Min Sec' · Deg Min Sec. · .... · .... · .: 'ft: '. · ". !ft. ... ft · ff : · ft.'.." ' · · ..' .. 02-21A Polygon1.1 0,00 -4487.96 4305,92 5944649.56 691299.56 70 15 12.129 N 148 27 14.605 W -Polygon 1 0.00 -4487.96 4305.92 5944649.56 691299.56 70 15 12.129 N 148 27 14.605 W -Polygon 2 0.00 -4344.23 4559.60 5944799.54 691549.58 70 15 13.541 N 148 27 7.224 W -Polygon 3 0.00 -4752.85 4899.54 5944399.51 691899,54 70 15 9.520 N 148 26 57.343 W -Polygon 4 0.00 -5144.03 4539.66 5943999.54 691549.50 70 15 5.675 N 148 27 7.818 W 02-21A T1.1 8995.00 -4440.47 4407,14 5944699.55 691399,57 70 15 12.595 N 148 27 11.660W 02-21A T1.2 02-21A T1.3@TD Annotation 8995.00 -4644.78 4577,11 5944499.54 691574.55 70 15 10.585 N 148 27 6.720W 8995.00 -4895.97 4620.87 5944249.53 691624.52 70 15 8.114 N 148 27 5.451W .. · MD TVD " '. ' ' ' - ................... : ............ --~ · .. .. . 11300.00 8888.72 TIP 11330.00 8911.02 KOP 11537.77 8993.62 1 11722.77 8993.62 2 12222.77 8993.62 3 12525.00 8993.62 TD ,, ObP BP Amoco Baker Hughes INTEQ Planning Report i.~q~:.'i!'~'~ ............................. Company: BP Amoco Date: 4/20/2001 Time: 11:06:10 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 02-21, True North Site: PB DS 02 Vertical (TVD) Reference: System: Mean Sea Level Well: 02-21 Section (VS) Reference: Well (0.00N,0.00E,136.02Azi) Wellpath: Plan#1 02-21A Sur~ey Calculation Method: Minimum Curvature Db: Oracle Plan Section Information MD lncl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/100ft deg 11300.00 42.08 142.31 8888.72 -3884.56 4158.22 0.00 0.00 0.00 0.00 11330.00 41.90 142.25 8911.02 -3900.43 4170.50 0.61 -0.60 -0.20 192.55 11537.77 90.00 157.41 8993.62 -4061.50 4258.51 24.00 23.15 7.30 20.00 11722.77 90.00 175.91 8993.62 -4240.73 4301.02 10.00 0.00 10.00 90.00 12222.77 90.00 125.91 8993.62 -4663.91 4536.48 10.00 0.00 -10.00 270.00 __1_27_5_.__0~ ...... 9__0_ ._0_0 ......... ?.5.6._1_3_ ....... _8..9_9 _3.~,6_ _2__ __ _- 48_9_6_.?, .4- ...... _4f.2_.4_._3_9 ....... 1~0:0_0_ ........~.:?0_ ...... _1___0:_0__0 ........ _9.0_._0_0_ ............................................ Survey ft deg :deg ff ff : ;ff ff : deg/100ff ff i deg 11300.00 42.08 142.31 8888.72 -3884.56 4158.22 5945249.08 691136.94 0.00 5682.74 0.00 TIP 11325.00 41.93 142.26 8907.30 -3897.79 4168.45 5945236.10 691147.50 0.61 5699.37 192.55 MWD 11330.00 41.90 142.25 8911.02 -3900.43 4170.50 5945233.52 691149.61 0.61 5702.69 192.59 KOP 11350.00 46.43 144.51 8925.36 -3911.62 4178.80 5945222.54 691158.19 24.00 5716.50 20.00 MWD 11375.00 52.15 146.91 8941.66 -3927.28 4189.46 5945207.15 691169.23 24.00 5735.17 18.37 MWD 11400.00 57.92 148.95 8955.98 -3944.63 4200.32 5945190.07 691180.52 24.00 5755.21 16.81 MWD 11425.00 63.71 150.75 8968.17 -3963.50 4211.27 5945171.48 691191.93 24.00 5776.39 15.64 MWD 11450.00 69.52 152.38 8978.09 -3983.67 4222.18 5945151.59 691203.34 24.00 5798.48 14.76 MWD 11475.00 75.34 153.89 8985.64 -4004.93 4232.94 5945130.61 691214.63 24.00 5821.25 14.11 MWD 11500.00 81.18 155.32 8990.72 -4027.03 4243.43 5945108.77 691225.66 24.00 5844.44 13.66 MWD 11525.00 87.02 156.71 8993.29 -4049,74 4253.53 5945086.32 691236.32 24.00 5867.79 13.37 MWD 11537.77 90.00 157.41 8993.62 -4061.50 4258.51 5945074.69 691241.59 24.00 5879.71 13.25 1 11550.00 90.00 158.63 8993.62 -4072.84 4263.09 5945063.47 691246.44 10.00 5891.05 90.00 MWD 11575.00 90.00 161.13 8993.62 -4096.31 4271.68 5945040.22 691255.62 10.00 5913.91 90.00 MWD 11600.00 90.00 163.63 8993.62 -4120.14 4279.25 5945016.59 691263.78 10.00 5936.31 90.00 MWD 11625.00 90.00 166,13 8993.62 -4144.27 4285.77 5944992.63 691270.89 10.00 5958.20 90.00 MWD 11650.00 90.00 168.63 8993.62 -4168.67 4291.23 5944968.38 691276.96 10.00 5979.55 90.00 MWD 11675.00 90.00 171.13 8993.62 -4193.28 4295.62 5944943.89 691281.96 10.00 6000.31 90.00 MWD 11700.00 90.00 173.63 8993.62 -4218.05 4298.93 5944919.20 691285.88 10.00 6020.44 90.00 MWD 11722.77 90.00 175.91 8993.62 -4240.73 4301.02 5944896.58 691288.53 10.00 6038.21 90.00 2 11725.00 90.00 175.69 8993.62 -4242.95 4301.18 5944894.37 691288.75 10.00 6039.92 270.00 MWD 11750.00 90.00 173.19 8993.62 -4267.83 4303.61 5944869.55 691291.79 10,00 6059.51 270.00 MWD 11775.00 90.00 170.69 8993.62 -4292.59 4307.11 5944844.90 691295.91 10.00 6079.75 270.00 MWD 11800.00 90.00 168.19 8993.62 -4317.16 4311.70 5944820.45 691301.10 10.00 6100.62 270.00 MWD 11825.00 90.00 165.69 8993.62 -4341.51 4317.35 5944796.25 691307.35 10.00 6122.07 270.00 MWD 11850.00 90.00 163.19 8993.62 -4365.59 4324.05 5944772.34 691314.65 10.00 6144.05 270.00 MWD 11875.00 90.00 160.69 8993.62 -4389.36 4331.80 5944748.78 691322.99 10.00 6166.54 270.00 MWD 11900.00 90.00 158.19 8993.62 -4412.76 4340.58 5944725.60 691332.35 10.00 6189.48 270.00 MWD 11925.00 90,00 155.69 8993.62 -4435.76 4350.38 5944702.85 691342.71 10.00 6212.83 270.00 MWD 11950.00 90.00 153.19 8993.62 -4458.31 4361.16 5944680.57 691354.05 10.00 6236.55 270.00 MWD 11975.00 90.00 150.69 8993.62 -4480.37 4372.92 5944658.81 691366.36 10.00 6260.59 270.00 MWD 12000.00 90.00 148.19 8993.62 -4501.90 4385.63 5944637.61 691379.60 10.00 6284.90 270.00 MWD 12025.00 90.00 145.69 8993.62 -4522.85 4399.27 5944617.01 691393.75 10,00 6309.45 270.00 MWD 12050.00 90.00 143.19 8993.62 -4543.18 4413,81 5944597.04 691408.79 10.00 6334.18 270.00 MWD 12075.00 90.00 140.69 8993.62 -4562.87 4429.22 5944577.75 691424.68 10.00 6359.04 270.00 MWD 12100.00 90.00 138.19 8993.62 -4581.86 4445.48 5944559.17 691441.40 10.00 6383.99 270.00 MWD 12125.00 90.00 135.69 8993.62 -4600.12 4462.55 5944541.34 691458.92 10.00 6408.99 270.00 MWD 12150.00 90.00 133.19 8993.62 -4617.62 4480.40 5944524.28 691477.20 10.00 6433.98 270.00 MWD 12175.00 90.00 130.69 8993.62 -4634.33 4498.99 5944508.05 691496.20 10.00 6458.91 270.00 MWD 12200.00 90.00 128.19 8993.62 -4650.21 4518.30 5944492.65 691515.89 10.00 6483.75 270.00 MWD 12222.77 90.00 125.91 8993.62 -4663.91 4536.48 5944479.41 691534.41 10.00 6506.23 270.00 3 12225.00 90.00 126.13 8993.62 -4665.22 4538.28 5944478.14 691536.24 10.00 6508.43 90.00 MWD 12250.00 90.00 128.63 8993.62 -4680.40 4558.15 5944463.46 691556.48 10.00 6533.14 90.00 MWD 12275.00 90.00 131.13 8993.62 -4696.43 4577.33 5944447.91 691576.05 10.00 6558.00 90.00 MWD BP Amoco Baker Hughes INTEQ Planning Report i~':'"i:i~-~ ........................ Company: BP Amoco Date: 4/20/2001 Time: 11:06:10 Page: 3 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 02-21, True North Site: PB DS 02 Vertical (TVD) Reference: System: Mean Sea Level Well: 02-21 Section (VS) Reference: Well (0.00N,0.00E,136.02Azi) Wellpath: Plan#1 02-21A Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool ff deg deg ff ff ff ff ff deg/100~ ff deg 12300.00 90.00 133.63 8993.62 -4713.28 4595.79 5944431.53 691594.93 10.00 6582.94 90.00 MWD 12325.00 90.00 136.13 8993.62 -4730.92 4613.51 5944414.33 691613.07 10.00 6607.94 90.00 MWD 12350.00 90.00 138.63 8993.62 -4749.31 4630.43 5944396.36 691630.45 10.00 6632.93 90.00 MWD 12375.00 90.00 141.13 8993.62 -4768.43 4646.54 5944377.65 691647.02 10.00 6657.87 90.00 MWD 12400.00 90.00 143.63 8993.62 -4788.23 4661.80 5944358.24 691662.77 10.00 6682.71 90.00 MWD 12425.00 90.00 146.13 8993.62 -4808.68 4676.18 5944338.16 691677.65 10.00 6707.41 90.00 MWD 12450.00 90.00 148.63 8993.62 -4829.74 4689.65 5944317.44 691691.64 10.00 6731.92 90.00 MWD 12475.00 90.00 151.13 8993.62 -4851.36 4702.20 5944296.14 691704.72 10.00 6756.19 90.00 MWD 12500.00 90.00 153.63 8993.62 -4873.51 4713.78 5944274.28 691716.85 10.00 6780.18 90.00 MWD 12525.00 90.00 156.13 8993.62 -4896.14 4724.39 5944251.93 691728.01 9.99 6803.83 90.00 TD 3S CTD BOP Detail ~. ,'Stuth!g Box (Pack-Off), 10,000 psi Working Pressure Methanol Injection ~, I, -- 7" Riser Offs 7" WLA Quick Connect - I I 7-1/i~'~Df, y,~0~pa~ ~[~ing pressure Manual ov~O~y~aulic TOT Flanged Fire Resistant Kelly Hose to Dual Choke Manifold HCR Annular BOP (Hydril),7-1/16" ID 5000 psi working pressure I Blind/Shear I 1 3 1,2" Combi Pipe/Slil~ Kill line check valve Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold 7-1/i~'~DF, y~aDa~ ~{~ing pressure' Manual ove~O~y~raulic ITOT 2" Side I 2 718" Combi Pipe/Slip 2 318" Combi Pipe/Slip XO Spool as necessary Single Manual Master Valve 2 flanged gate valves MOJ 5/16/01 Tubing Spool 7" Annulus 9 5/8" Annulus DATE I CHECK NO. INVOICE / CREDIT MEM~) DESCRIPTION GRoss DISCOUNT NET ~051401 100. O0 100. O0 MMENTS: Pe~'n~it to D~-ill Fee INST: S/H -Te~'~'ie Hub~le X4628 =K IS IN PAYMENT FOR ITEMS OESCRIBED ABOVE. ~]~-~1~ ~ 100. 0.0 100. O0 H LO'RATION, (ALASKA)INC, 196612 ~GE,' ALASKA 99519-661.2 "!:"~:'". ".I3~E=~,'HUNDRED ':ALASKA OIL AND oas CONSERVATION COMMISSION 333.WEST 7TH AVENUE SUITE 100 ANCHORAOE FIRST NATIONAL BANK OF ASHLAND ' ~ AN.AFFiLIATE OF NATIONAl: CITY BANK "CLEVELAND, OHIO 56~389: 412 ,No,, ::H .1 8.:.g 9 0:7 CONSOLIDATED COMMERCIAL ACCOUNT~ 00189907 [ "~ii 00-oo..1 NOTVALID AFTER 120 DAYS . ," ;i,.q. ~ c~O ?," m:O i, i ~0 :~8 ci Sm: OOR t, t, ;l, WELL PERMIT CHECKLIST COMPANY WELL NAME O.Z-~/,~ PROGRAM: exp dev ~Z' redrll ,~' serv wellbore sag ann. disposal para req FIELD & POOL ~ ~:~ INIT CLASS I ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available' in ddlling unit ............ 8. If deviated, is wellbore plat included ............. . . 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit canbe issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons ..... ..... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ....... ; ..... 23. If diverter required, does it meet regulations ....... ; . . ??o UNIT# //o/".~<:::~ ON/OFF SHORE .. AREA N N N N N N N. N N N N N N N N 24. 25. 26. 27. 28. 29. GEOLOGY 30. Permit can be issued wlo hydrogen sulfide measures ..... Y N / 31. Data presented on potential overpressUre zones ....... Y 32. Seismic analysis of shallow gas zones... ....... A~R I~AT~E 33. Seabed condition survey (if off-shore) ............. /~ N ' ' ' ~5',ZZ,//'~/ 34. Contact name/phone for weekly progress reports [exploratory o~,y] Y N . . BOPEs, do they meet regulation .......... ~.. '... N .. ' , ' BOPE press rating appropriate; test to ~S~¢,..) psig. ¥'~11~'-~ ~.5~, ~ ~LC)~, - ' Choke manifold complies w/APl RP-53 (May 84) .... ., .... Work will occur without operation shutdown. ~ N... r,, r---, t',,, ' ~, Is presence of H2S gas probable ................. Y ~_~J~,.~.~.,~,_~-_c.} t~'~..e.~.~'~?._~ ~ ,..~--~, ~,.~% ~.3'~ ~)~.c._~'~. [ s ~.~.~ct~.~t~ ,, ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ........ Y N APPR DATE (B) will not contaminate freShwater; or cause drilling waste Y N to surface; (C) will not impair mechaniCal integrity of the well used for disPosal; Y' N (D) will not damage producing formation or impair recovery from a Y N pool; and . (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING:. ~ UIC/Annular COMMISSION: Commentsllnstructions: 0 0 Z 0 Z -I '1- c:~nsoffice\wordian~diana\checklist (rev. 11101fl00) Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding informatiOn, information, of this. nature is accumulated at the end of the file under APPEN. DIXi No 'special'effort has been made to chronologically organize this category of information. **** REEL HEADER **** MWD 02/03/18 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 02/03/18 167242 01 2-7/8" OXP *** LIS COMMENT RECORD *** Remark File Version 1.000 Extract File: ldwg.las -Version Information VERS. 1.20: WRAP. NO: ~Well Information Block #MNEM.UNIT STRT.FT STOP PT STEP PT NULL COMP WELL FLD LOC CNTY STAT SRVC TOOL DATE API Data Type 11303.0000: 12408.0000: 0.5000: -999.2500: COMPANY: WELL: FIELD: LOCATION: COUNTY: STATE: SERVICE COMPANY: TOOL NAME & TYPE: LOG DATE: API NYUMBER: -Parameter Information Block CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ............................... Starting Depth Ending Depth Level Spacing Absent Value BP Exploration, Inc. 02-21A Prudhoe Bay Unit 2153' SNL, 5177' WEL North Slope Alaska Baker Hughes INTEQ 2-7/8" OXP 07-Jun-01 500292078101 #MNEM.UNIT Value Description SECT. 36 : Section TOWN.N llN : Township RANG. 14E : Range PDAT. MSL : Permanent Datum EPD .F 0 : Elevation Of Perm. Datum LMF . RKB : Log Measured from FAPD.F 64 : Feet Above Perm. Datum DMF . KB : Drilling Measured From EKB .F 64 : Elevation of Kelly Bushing EDF .F N/A : Elevation of Derrick Floor EGL .F N/A : Elevation of Ground Level CASE.F N/A : Casing Depth OS1 . DIRECTIONAL : Other Services Line 1 ~Remarks (1) Ail depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All Gamma Ray data (GRAX) and Resistivity data (RACLX, RPCLX, RACHX, RPCHX) presented is realtime data. (4) Well 02-21A was drilled as an open hole sidetrack on well 02-21. (5) The open hole sidetrack began at 11306' MD (8893' SSTVD). The hole was tied in with a Gamma Ray log from well 02-21 at 10782.5'. (6) Well 02-21A was drilled to TD @ 12408' MD (8994' SSTVD). (7) Baker Hughes INTEQ Run 3 utilized the Orient Express with Ultra Slim Multiple Propagation Resistivity (USMPR) services from 11455' to 11534' MD. Then the tool failed to transmit any resistivity data. Mud resistivity was 0.098 ob_mm / 150 F. (8)The interval from 12378' MD (8993' SSTVD) to 12408' MD (8994' SSTVD) was not logged due to sensor to bit offset. (9) The data presented here is final and was depth shifted to a PDC (Primary Depth Control) curve supplied by BPX (SWS, 10-Jun- 2001). (10) A Magnetic Declination correction of 26.79 degrees has been applied to the Directional Surveys. MNEMONICS: GRAX = Gamma Ray MWD-API [MWD] (MWD-API units) ROPS = Rate of Penetration, feet/hour TVD = Subsea True Vertical Depth (SSTVD), (feet) RACLX = Resistivity Compensated 400 kHz Attenuation Resistivity Borehole Corrected [MWD], (ohm-m) RPCLX = Resistivity Compensated 400 kHz Phase Difference Resistivity Borehole Corrected MWD], (ohm-m) RACHX = Resistivity Compensated 2 MHz Attenuation Resistivity Borehole Corrected [MWD], (ohm-m) RPCHX = Resistivity Compensated 2 MHz Phase Difference Resistivity Borehole Corrected [MWD], (ob_m-m) SENSOR OFFSETS: RUN GAMMA 1 30.40 ft 2 27.34 ft 3 27.26 ft 4 27.25 ft 5 27.24 ft PAIRS=/ 11320 11333 11374 11397 11433 11470 11510 11606 11668 11962 11978 EOZ END 7 11322 7, 2 11334 6, 5 11375 9, 3 11398 7, 6 11435 6, 8 11472 6, 2 11513.7, 7 11603.7, 9 11668.3, 1 11959.6, 1 11976.5, DIRECTIONAL RESISTIVITY 36.10 ft. N/A 33.04 ft. N/A 32.96 ft. 53.87 ft. 32.95 ft. N/A 32.94 ft. N/A 2 02051 1 41406 1 41504 1 41406 2 01953 1 81836 3 43457 -3.03027 -0.606445 -2.42383 -1.61621 BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 91 records... Minimum record length: Maximum record length: 10 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN mwd.xtf LCC 150 CN BP Exploration, Inc. WN 02-21A FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!:!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by BPX 3. The PDC used is a Schlumberger Gamma Ray dated 10-Jun-01. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR GR GRAX10 0.0 ROP ROP ROPS10 0.0 RAL RAL RACLX10 0.0 RAH RAH RACHX10 0.0 RPL RPL RPCLX10 0.0 RPH RPH RPCHX10 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 1.000000 Frame spacing units: IF ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 1.000 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 2 ROP MWD 68 1 3 RAL COMP 68 1 4 RAH COMP 68 1 5 RPL COMP 68 1 6 RPH COMP 68 1 Size API 4 F/HR 4 Length 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 31 Tape File Start Depth = 11303.000000 Tape File End Depth = 12408.000000 Tape File Level Spacing = 1.000000 Tape File Depth Units = feet *~* FILE TRAILER ~ Tape Subfile: 2 44 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU ............................ WDFN mwd.xtf LCC 150 CN BP Exploration, Inc. WN 02-21A FN Prudhoe Bay Unit COUN North Slope STAT Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is the unedited field raw data. *** INFORMATION TABLE: CIFO PINEM CHAN DIMT CNAM ODEP GRAX GRAX GRAX 0 0 ROPS ROPS ROPS 0 0 RALX RALX RACLX 0 0 RAHX RAHX RACHX 0 RPLX RPLX RPCLX 0 0 RPHX RPHX RPCHX 0 0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 28 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 1.000000 Frame spacing units: IF ] Number of frames per record is: 36 One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 1.000 * F ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units 1 GRAX MWD 68 1 API 2 ROPS MWD 68 1 F/HR 3 RALX MWD 68 1 OHMM 4 RAHx MWD 68 1 OHMM 5 RPLX MWD 68 1 OHMM 6 RPHX MWD 68 1 OHMM Size 4 4 Length 4 4 4 4 4 4 4 4 4 4 24 Total Data Records: 31 Tape File Start Depth = 11303.000000 Tape File End Depth = 12408.000000 Tape File Level Spacing = 1.000000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 44 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** TAPE TRAILER **** 02/03/18 167242 01 **** REEL TRAILER **** MWD 02/03/18 BHI 01 Tape Subfile: 4 Minimum record length: Maximum record length: Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR RPL RPH 11303.0000 49.1170 -999.2500 -999.2500 11304.0000 26.3540 -999.2500 999.2500 11400.0000 25.3009 -999.2500 -999.2500 11500.0000 20.0134 4.8812 4.1430 11600.0000 72.3824 -999.2500 -999.2500 11700.0000 15.9065 -999.2500 -999.2500 11800.0000 15.4460 -999.2500 -999.2500 11900.0000 17.2550 -999.2500 -999.2500 12000.0000 15.6940 -999.2500 -999.2500 12100.0000 26.9190 -999.2500 -999.2500 12200.0000 15.7349 -999.2500 -999.2500 12300.0000 14.1578 -999.2500 -999.2500 12400.0000 -999.2500 -999.2500 -999.2500 12408.0000 -999.2500 -999.2500 -999.2500 2 records... 132 bytes 132 bytes ROP -999.2500 -999.2500 32.6069 90.5301 91.1247 45.3747 41.3468 261 5264 102 9190 62 0065 90 5173 29 7395 15 3739 -999.2500 RAL -999.2500 -999.2500 -999.2500 6.4966 -999.2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 RAH -999 -999 -999 25OO 2500 2500 5 0710 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = Tape File End Depth Tape File Level Spacing Tape File Depth Units Tape Subfile 3 is type: LIS DEPTH GRAX RPLX RPHX 11303.0000 20.9470 -999.2500 -999.2500 11304.0000 19.0320 -999.2500 -999.2500 11400.0000 15.4710 -999.2500 -999.2500 11500.0000 20.0140 4.8710 3.6480 11600.0000 64.2630 -999.2500 -999.2500 11700.0000 15.7450 -999.2500 -999.2500 11800.0{100 17.9190 -999.2500 -999.2500 11900.0000 14.6750 -999.2500 -999.2500 12000.0000 15.6940 -999.2500 -999.2500 12100.0000 28.2620 -999.2500 -999.2500 12200.0000 15.8410 -999.2500 -999.2500 12300.0000 14.5770 -999.2500 -999.2500 12400.0000 -999.2500 -999.2500 -999.2500 12408.0000 -999.2500 -999.2500 -999.2500 11303.000000 12408.000000 1.000000 feet ROPS -999.2500 -999.2500 33.8920 63.9690 46.1590 45.3400 35.2490 2166 6147 99 2770 58 4470 72 7590 32 2020 11 4850 -999 2500 Tape File Start Depth = Tape File End Depth = Tape File Level Spacing = Tape File Depth Units = Tape Subfile 4 is type: LIS 11303.000000 12408.000000 1.000000 feet RALX -999.2500 -999.2500 -999.2500 7.1100 -999.2500 -999.2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999.2500 RAHX -999 2500 -999 2500 -999 2500 6 0030 -999 2500 -999 2500 -999 2500 -999.2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500 -999 2500