HomeMy WebLinkAbout200-015 Image( ,'eject Well History' File Cover F{' je
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
~_~_.(~ ~)J ~ Well History File Identifier
Organizing I~o,,,;I []
RESCAN
[~ Color items:
[]Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
BY:
BEVERLY ROBIN VINCENT SHERYL(~WINDY
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERYOINDY
Scanning Preparation
,~ x30= ~20
BY:
BEVERLY ROBIN VINCENT SHERYL A~ WINDY
Production Scanning
Stage I PAGE COUNT FROM SCANNED FILE:
BY:
Stage 2
BY~
(SCANNING IS coMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES )
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: _.~ YES NO
IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES ~ NO
BEVERL~INCENT SHERYL MARIA WINDY
ReScanned (htdiv~duat p,~..q~ [,~peciat ,~ft~t~ti~] .seann#Lq cr~t,ph~ed)
RESCANNEDB~': BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE:
Is~
General Notes or Comments about this file:
Quality Checked
12/10/02Rev3NOTScanned.wpd
u
~°` .
ConocoPhiilps
a~as
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360---- --- -
February 1, 2010
Mr. Dan Seamount
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Dear Mr. Dan Seamount:
DECEIVED
~1A~ d ~ Zi1i0
~~83k8 ~{f ai ~8$ laeti3, ~OIYSIIISSIOn
Anchorage
'~,
wpb- a l5
~~ ~~ ~ .
Enclosed-please find aspreadsheet-with a list of wells from the Kuparuk field (KRLI). Each of
these wells was found to have a void in the conductor. These voids were filled with cement if
needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As
per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that
the treatments took place and meets the requirements of form 10-404, Report of Sundry
Operations.
The cement was pumped December 5th, 2009. The corrosion inhibitor/sealant was pumped
December 22°d, 25th, 26th & 28th, 2009. The attached spreadsheet presents the well name, top of
cement depth prior to filling, and volumes used on each conductor.
Please call MJ Loveland or Perry Klein at 907-659-7043, if you have any questions.
Sincerely,
Kl
ConocoPhillips Well Integrity Projects Supervisor
• ..
ConocoPhillips Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Kuparuk Field
Date 3/1/2010 1G. 1L & 1R Pad
Well Name
API #
PTD #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft al
1G-17 50029229450000 1990620 SF n/a 17" n/a 7.65 12/26/2009
1L-01 50029211960000 1841730 52' 7.7 31" 12/5/2009 10.15 12/22/2009
1 L-02 50029211930000 1841700 45' 5.7 35" 12/5/2009 10.15 12/22/2009
1 L-04 50029211790000 1841540 40' 3.9 24" 12/5/2009 5.8 12/22/2009
1 L-06 50029211640000 1841330 2'5" n/a 2'5" - n/a 7.22 12/26/2009
1 L-08 50029211750000 1841500 34' 3.7 40" 12/5!2009 10.2 12/26/2009
1L-09 50029220250000 1900340 11" n/a 11" n/a 1.27 12/26/2009
1 L-11 50029220340000 1900450 16" n/a 17" n/a 2.25 12/25/2009
1 L-12 50029220330000 1900440 7" n/a 15" n/a 3.4 12/25/2009
1 L-13 50029221500000 1910420 13' 2.2 27" 12/5/2009 5.52 12/26/2009
1 L-17 50029221510000 1910430 26' 4.0 18" 12/5/2009 9.35 12/26/2009
1 L-19 50029220490000 1900610 9' 2.5 19" 12/5/2009 4.25 12/25/2009
1 L=23 50029221670000 1910620 SF n/a 17" n/a 2.12 12/26/2009
1 L-26A 50029221730100 2000150 SF n/a 17" n/a 2.97 12!25/2009
1 R-14 50029213860000 1851510 SF n/a 29" n/a 5.95 12/28/2009
1 R-31 50029225380000 1941680 6" n/a 24" n/a 7.22 12/28/2009
1 R-32 50029225230000 1941460 SF n/a 24" n/a 5.95 12/28/2009
1 R-33 50029225290000 1941560 SF n/a 24" n/a 4.67 12/28/2009
1. Operations Performed: Abandon 0
Alter Casing 0
Change Approved Program 0
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska 99510
7. KB Elevation (ft):
RKB 121'
8. Property Designation:
Kuparuk River Unit
11. Present Well Condition Summary:
Total Depth
Effective Depth
Casing
Structural
CONDUCTOR
SURF CASING
PROD CASING
LINER
Perforation depth:
measured
true vertical
measured
true vertical
Length
121'
5104'
8379'
3145'
')
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Repair Well 0
Pull Tubing 0
Ope rat. ShutdownD
Stimulate 0
Waiver 0
Other
o
o
o
Plug Perforations 0
Perforate New Pool 0
Perforate 0
4. Current Well Status:
Development 0
Stratigraphic 0
Time Extension
Re-enter Suspended Well
5. Permit to Drill Number:
200-0151
6. API Number:
50-029-22173-01
Exploratory 0
Service 0
9. Well Name and Number:
1 L-26A
10. Field/Pool(s):
Kuparuk River Field 1 Kuparuk Oil Pool
11450'
6190'
feet
feet
feet
feet
Plugs (measured)
Junk (measured)
Size
MD
TVD
Burst
Collapse
16"
9-5/8"
3-1/2"
121'
5225'
8500'
11450'
121'
3601'
5401'
SCANNED DEC ~ ~ 2005
7"
Measured depth: 9559-69,10420-10450,10470-10500, 10530-10590,11040-11070,11275-11305
Prior to well operation
Subsequent to operation
14. Attachments
Copies of Logs and Surveys run _
true vertical depth: 5944-5946,5936-5937,5937-5937,5937-5936, 5944-6006, 6103..6118
RECEr" l
DEC 2 ø ~O$
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 8365' MD.
Packers & SSSV (type & measured depth) pkr= BAKER ZXP LINER PACKER pkr= 8312'
SSSV= NIP SSSV= 535'
12. Stimulation or cement squeeze summa NA
Intervals treated (measured)
Treatment descriptions including volumes used and final pressure:
Alaska Oil &. Gas L .:¡, .~.;I :';~ ,;:'
Ancho¡
Oil-Bbl
25
120
Representative Daily Average Production or Injection Data
Gas-Met Water-Bbl
11 81
58 164
15. Well Class after proposed work:
Exploratory 0 Development 0
Service 0
13.
Casinç¡ Pressure
1370
2410
Tubinç¡ Pressure
141
176
Daily Report of Well Operations _X 16. Well Status after proposed work:
Oil0 GasD WAG 0 GINJD WINJ 0
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A it C.O. Exempt:
Contact
Printed Name
Signature
WDSPL D
MJ Loveland I Marie McConnell
MJ Lovel d, / ~
7.::;~ ~ Phone 659-7224
/ tfZ RBDMS BFl DEC 2 8 2005
Problem Well Supervisor
Date 1J/;;1 it:)~-
Submit Original Only
')
1 L-26A
DESCRIPTION OF WORK COMPLETED
SUMMARY
)
Date Event Summary: Convert from GL to Surface Powered Jet Pump
11/2/20051 Dummied off gas lift string in tubing
11/3/2005 Loaded IA and MITIA - Passed
MITIA Results: Test 1, TIIIO = 250/200/400, start 250/3000/700, 15 minute 250/2900/700, 30
minute 250/2850/680 psi. Lost 150 psi.
Test 2 start 225/3000/690, 15 minute 225/3000/690, 30 minute 225/3000/690. Lost 0 psi in 30
minutes (Pass). Pre jet pump installation.
11/4/2005 SET BOTTOM OF ECLIPSE PACKER AT 8285',3' BELOW BOTTOM GLM LOWER
CONNECTION AND 4' ABOVE PUP JOINT.
11/6/2005 TESTED LOWER ECLIPSE PACKER AND CMIT TBG X IA TO 2500 PSI ( PASSED). SET
STRADDLE JET PUMP WI # 5 NOZZLE / # 6 THROAT (SER. PH-1128 ). (( OAL= 23.88'---
»>ECLlPSE PACKER-SPACER PIPE-JET PUMP-SPACER PIPE-SNAP LATCH
ASSEMBLY)) @ 8285' RKB ( TOP OF ECLIPSE PACKER @ 8261' RKB). (( MAX
PRESSURE @ 8285' RKB IS 2841 AND 125 DEGREES))
Summary MITIA passed; Set surfaced powered Jet pump on Eclipse packer system from 8285'-8261'
)
. C()rlt)CQPhillpSAI~~2~~; In~,
~~~~ I ,::: ....., ',:::::: I ~ sssv T::~~ ~~g~~~217301
~g¡:'igj ". I Annular Fluid
" : :'.','. ~ Reference Log:
¡I!¡i:~c~~~:í~~~ _~~f~~~MD
Cw¡jJ Descri~~~fg;~I~~
f::::'" 'ìiiiiìiiiI!II I PROD CASING
t.~.·. ~ LINER
1'1 ¡Tubing String -ALL
. : Size I Top
...:... I 3.500 0
:,.." ! Perforations Summary
Ii Interval TVD
: 9559 - 9569 5944 - 5946
.',' r ....
~:.::~.' . ::: :.:::
FRAC
(9559-9569)
Perf
:10420-10450)
Perf
:10470-10500)
Perf
:10530-10560)
NIP
:10690-10691,
00:3.500)
NIP
:10752-10753,
00:3,500)
FRAC
:11040-11070)
FRAC
:11275-11305)
1"GlV
:11358-11359,
00:2.000)
~
~
! ¡¥!:t~:
, ¡~~~\{J
¡...
"".
.....................
11:.::::11:::1:::.....
¡;\¡¡;¡i"¡:¡"'i
sj :~
~ Œ
: :
: :
: :
~ .~
~ ì
- . ~
ªttª
~ ....~
fl·
Á ~
)
KRU
1 L-26A
Well Type: PROD
Orig 3/21/2000
Com pletion:
Last W/O:
Angle @ TS: 80 deg @ 9538
Angle @ TD: 60 deg @ 11450
Rev Reason: GL V C/O, Set
PUMP
Last Update: 11/11/2005
Ref Log Date:
TD: 11450 ftKB
Max Hole Angle: 94 deg (ã) 10227
Size Top Bottom TVD Wt Grade Thread
16.000 0 121 121 62.58 H-40 WELDED
9.625 0 5225 3601 40.00 L-80 BTCM
7.000 0 8500 5401 26.00 L-80 BTCM
3.500 8305 11450 11450 9.30 L-80 EUE8RD
Bottom TVD Wt I Grade I Thread
8365 5329 9.30 L-80 EUE8RD
Zone
C-4
C-4
Status Ft SPF Date Type Comment
10 6 12/28/2000 APERF 2.5" BH HSD; 60 deg ph
30 4 9/17/2000 APERF CTC 2.5" HSD Powerjet
charges; 60 deg ph
30 4 9/17/2000 APERF CTC 2.5" HSD Powerjet
charges; 60 deg ph
60 4 9/16/2000 APERF CTC 2.5" HSD Powerjet
charges; 60 deg ph
30 4 6/4/2000 APERF 2.5" HSD
10470 - 10500
5937 - 5937
C-4
10530 - 10590
5937 - 5936
C-4
11040 - 11070
C-4,UNIT
B
A-5
A-5
A-5
15 4 4/28/2000 IPERF 2.5" HC BH; 180 deg ph
5 8 5/12/2000 RPERF 2.5" HC BH; 180 deg ph
10 4 4/28/2000 IPERF 2.5" HC BH; 180 deg ph
Comment
A5 SAND FRAC
Placed 53M Ibs of proppant in formation
Placed 99M Ibs of proppant in the C4 Sand
V Type VOD latch Port TRO Date Vlv
Run Cmnt
DMY 1.0 BK 0.000 0 11/1/2005
DMY 1.0 BK 0.000 0 11/2/2005
DMY 1.0 BK 0.000 0 11/2/2005
DMY 1.0 BK 0.000 0 6/29/2000
DPHFCV 1.5 RKP 0.188 0 11/3/2005
5994 - 6006
11275-11290 6103-6111
11290-11295 6111-6113
11295-113056113-6118
! Stimulations & Treatments
Interval Date
11275 - 11305 5/13/2000 FRAC
----rï040 - 11070 7/7/2000 FRAC
9559 - 9569 12/28/2000 FRAC
I Gas Lift MandrelsNalves
St MD TVD Man Man Type V Mfr
Mfr
1 3539 2616 CAMCO KBMM2 CAMCO
2 5761 3904 CAMCO KBMM2 CAMCO
3 7302 4762 CAMCO KBMM2 CAMCO
4 8224 5254 CAMCO KBMM2 CAMCO
5 8274 5280 CAMCO MMM CAMCO
: Other (plugs, equip., etc.) - JEWELRY
Depth TVD Type
535 533 NIP
8285 5286 PUMP
Type
Description
ID
2.875
0.000
8312 5300
8320 5305
8329 5310
10690 5936
10752 5937
Depth
11358 1"GLV
11359 PLUG
CAMCO DS NIPPLE
SET BOTTOM OF ECLIPSE PACKER AT 8285',3' BELOW BOTTOM GLM
LOWER CONNECTION AND 4' ABOVE PUP JOINT. SET STRADDLE
JET PUMP WI # 5 NOZZLE / # 6 THROAT (SER. PH-1128) (( GAL=
23.88'--->>>ECLlPSE PACKER-SPACER PIPE-JET PUMP-SPACER
PIPE-SNAP LATCH ASSEMBLY)) @ 8285' RKB (TOP OF ECLIPSE
PACKER @ 8261' RKB). set 11/6/2005
BAKER ZXP LINER PACKER
CAMCO DS NIPPLE
BAKER 80-40 SEAL ASSY
XN NIPPLE wINO-GO. SHL T Box X Pin.
POLISHED BORE NIPPLE. SHL T Box X Pin.
5.000
2.813
3.500
2.750
2.750
PKR
NIP
SEAL
NIP
NIP
Description
Comment
PLUG PIECES PUSHED DOWNHOLE TO BOTTOM 1/28/2003
,
-St:-f pUn?/J fRo~
<¡f~8S-- ~dbl
e e RECEIVED
STATE OF ALASKA NOY 2 2 2005
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONs'laska Oil & Gas Cons. Commission
1. Operations Peñormed: Abandon D Repair Well D Plug Peñorations D Stimulate D Other A'rn!r0~mp Install.
Alter Casing D Pull Tubing D Peñorate New Pool D Waiver D Time Extension D
Change Approved Program D Opera!. ShutdownD Perforate D Re-enter Suspended Well D
2. Operator Name: 4. Current Well Status: 5. Permit to Drill Number:
ConocoPhillips Alaska, Inc. 0 Exploratory D . {~1~L\ '';
3. Address: Stratigraphic D Service D 6. API Number:
P. O. Box 100360, Anchorage, Alaska 99510 50-029-22173-01
7. KB Elevation (ft): 9. Well Name and Number:
RKB 30' 1L-26A
8. Property Designation: 10. Field/Pool(s):
ADL 25663,25659,25664, ALK 472 Kuparuk River Field I Kuparuk Oil Pool
11. Present Well Condition Summary:
Total Depth measured 11450' feet
true vertical 6190' feet Plugs (measured)
Effective Depth measured 11300' feet Junk (measured)
true vertical feet
Casing Length Size MD TVD Burst Collapse
Structural
CONDUCTOR 121' 16" 121' 121'
SURF CASING 5104' 9-5/8" 5225' 3601'
PROD CASING 83"79\ 7" 8500' 5401'
LINER 3145' 3-1/2" 11450' 6190'
Perforation depth: Measured depth: 9559'-9569',10420'-10450', 10470'-10500', 10530'-10590', 11040'-11070', 11275':11301>t--
true vertical depth: 5944'-5946',5936'-5937',5937'-5937', 5937'-5936', 5994'-6006', 6103'-6118'
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 8365' MD.
SCANNED DEe 1 9 2D05
Packers & SSSV (type & measured depth) pkr= BAKER ZXP LINER PACKER pkr= 8312' ~
Cameo OS nipple 535'
12. Stimulation or cement squeeze summary: RBDMS 8FL IVOV 2 3 2005
Intervals treated (measured) not applicable
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Met Water-Bbl Casino Pressure Tubino Pressure
Prior to well operation 0 0 0 925 1030
Subsequent to operation 120 58 164 2410 145
14. Attachments 15. Well Class after proposed work:
Copies of Logs and Surveys run _ Exploratory D Development 0 Service D
Daily Report of Well Operations_X 16. Well Status after proposed work:
oi0 GasD WAGD GINJD WINJD WDSPL D
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact Jim Stein/Mike Timmcke @ 659-7493
Printed Name Lara Bennett ~ Title CPF-1 Drillsite Petroleum Engineer
Signature X)Ov~ iJ· ~~ Phone 9 D7 " ¡65 -to If À Î Date II-Jl-D5
Prenared bv Sharon AI/sun-Drake 263-4612
Form 10-404 Revised 04/2004
ORiG\NAl
Submit Original Only
w
.... ""'"
e
1 L-26A Well Events Summary
e
Date Summary
10/31/05 DRIFTED TBG. DRIFT DOWN TO 8360' SLM W/ NO PROBLEMS. BRUSH AND FLUSHED TBG. @
8220' SLM TO 8350' SLM
11/01/05 PULLED LGLV'S FROM STA#1, 2, AND 3. SET DGLV IN STA#1. IN PROGRESS.
11/02/05 SET DGLV IN STA#2 AND #3. PULLED OV FROM STA#5. SET 2.813 CS-A2 PLUG @ 8320' RKB,
IN PROGRESS.
11/3/2005 CIRCULATED 340 BBLS OF DIESEL DOWN TBG, UP lA, AND DOWN FLOWLINE. SET 1.5" DGLV
IN STA #5 AND MITIA W/ LRS (PASSED). PULLED DGLV IN STA #5 AND SET 1.5" DPHFCV IN
STA #5. PULLED CSA-2 PLUG @ 8320' RKB.
11/4/2005 SET BOTTOM OF ECLIPSE PACKER AT 8285',3' BELOW BOTTOM GLM LOWER CONNECTION
AND 4' ABOVE PUP JOINT.
11/6/2005 TESTED LOWER ECLIPSE PACKER AND CMIT TBG X IA TO 2500 PSI (PASSED). SET
STRADDLE JET PUMP W/#5 NOZZLE / #6 THROAT. TOP OF ECLIPSE PACKER @ 8261' RKB.
•
MEMORANDUM
TO: Robert Christenson
Chairman
•
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: March 16, 2000
SUBJECT: Blowout Preventer Test
THRU: Blair Wondzell ~.~~ Nabors 16E
P.I. Supervisor ~f~f 7 Arco CPF 1 L pad
FROM: Lou Grimaldi ~ aov - O !S
Petroleum Inspector uparuk River Field
NON- CONFIDENTIAL
Operator Rep.: Fred Herbert
Contractor Rep.: Oave Hanson
Test Pressures Rams:
MISC. INSPECTIONS:
P/F
Location Gen.: P Sign:
Housekeeping: P Rig cond:
PTD On Location P Hazard:
Standing Order. P
BOP STACK:
Quantity Size
Op. phone: 659-7562 Op. E-Mail: n1333~mail.aai.arco.com
Rig phone: 659-7075 Rig E-Mail
Annular: Choke:
TEST DATA
FLOOR VALVES:
P/F Quantity P/F
P Upper Kelly 1 P
P Lower Kelly 1 P
P Ball Type 1 P
Inside BOP 1 P
P/F
Annular Preventer 1 13 5/8 P
Pipe Rams 1 3 1/2 x 6 P
Lower Pipe Rams 1 4 P
Blind Rams 1 N!A P
Choke Ln. Valves 1 4 P
HCR Valves 2 4 P
Kill Line Valves 3 3 P
Check Valve 0 N/A
CHOKE MANIFOLD:
Quantity P/F
No. Valves 17 P
Man. Chokes 1 P
Hyd. Chokes 2 P
MUD SYSTEM: Visual Alarm
Trip Tank P P
Pit Level Indicators P P
Flaw Indicator P P
Meth Gas Detector P P
H2S Gas Detector P P
ACCUMULATOR SYSTEM:
Time/Psi P/F
System Pressure 3050 P
After Closure 1550 P
200 psi Attained :38 P
Full Pressure 3:13 P
Blind Covers (All Stations): P
N2 Bottles (avg): 6 bolt. 2000psi
Test's Details
The rig was ready when I arrived. All BOP equipment vas tested this evening with no failures observed. The rig's
overall condition was fair. The rigs gas detectors were tested and passed.
The area surrounding the rig was neat and orderly, there was much snow left from the recent blows with the road
having many drifts along it.
This rigs performance has much improved since it started up. The test time remains slightly long but only reflects
Truman Knutsan's (Driller) intent on performing a good test.
Total Test Time: 41/2 Number of failures: None Attatchments: None
cc: Mike Zanahi (Kuaaruk drillinpl
sheet by L.G. 3/19/00. BOP Nabors 1fiE 3-16-00 LG.xls 3/2v0o
MICROFILMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
Permit to Drill 2000150
MD 11450 ~ 'rVD
DATA SUBMITTAL COMPLIANCE REPORT
7110/2003
Well Name/No. KUPARUK RIV UNIT 1L-26A
Operator CONOCOPHILLIPS ALASKA INC
6190 '---- Completion Dat 4/27/2000 ~ Completion Statu 1-OIL
Current Status 1-OIL
APl No. 50-029-22173-01-00
UIC N
REQUIRED INFORMATION
Mud Log N_go Sample N._.~o
Directional Survey N._~o
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digi~l Digital
Type ~d~a Fmt
Log Log Run
Name Scale Media No
Interval
OH /
Start Stop CH
SCMT 5 FINAL
..13~P,/EWR-M D 2/5 FINAL
~D~PJCTN/SLD-MD 2/5 FINAL
d;~PJCTN/SLD-TVD- 2/5 FINAL
~GPJEWR-TVD 2/5 FINAL
GPJCCL-TEM/PRES 5 FINAL
SRVY RPT
9590 2,3
Leak Detect 2/5 FINAL
8419 11408 Open
8100 11305 CH
8486 11450 OH
8486 11450 OH
5393 5958 OH
5393 5958 OH
8100 11305 CH
6147 10935 OH
OH
0 9310 ch
(data taken from Logs Portion of Master Well Data Maint)
Dataset
Received Number Comments
8/23/2000 ~590 8419-11408
5/19/2000 BL(C) 8100-11305 ~'~ ~
8/23/2000 8486-11450
8/23/2000 8486-11450
8/23/2000 5393-5958
8/23/2000 5393-5958
5/12/2000 8100-11305
5/16/2000 SPERRY 6147-10935.
8/23/2000 ~ SPERRY
MPTIGRIEWR41CNPISLD
10/26/2001 0-9310 BE, Sepia /~ l.
Well Cores/Samples Information:
Name
Interval
Start Stop Sent
Dataset
Received Number
Comments
ADDITIONAL INFORMATION
Well Cored? Y / I~
Chips Received? ~
Analysis ~
R ~.r~.iv~.d ?
Daily History Received? ~,~ / N
Formation Tops ~,~/N
Comments:
Permitto Drill 2000t50
MD 11450 TVD
DATA SUBMITTAL COMPLIANCE REPORT
7/1012003
Well Name/No. KUPARUK RIV UNIT 1L-26A
Operator CONOCOPHILLIPS ALASKA INC
6190 Completion Dat 4/27/2000
Completion Statu 1-OIL
Current Status 1-OIL
APl No. 50-029-22173-01-00
UIC N
Compliance Reviewed By:
Date:
Schlumberger
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 1539
Company:
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Kuparuk
Well Job # Log Description Date BL Sepia CD Color
1L-26A <~b-~)15 LEAK DETECTION LOG v~ 09/24/01 I 1
1R-13/~5~1.~ INJECTION PROFILE v/ 09124101 1 1
3K-19~D/-/~ 21351 SCMT ~ 07/17/01 1
1D-1211~'l~l 21403 RST
1D-140 ~-/~ 21404 RST ~ 09/09/01 1 1 1
1D-140 2t379 RST ~ 08/15/01 I 1 1
10/16/2001
$1GNL~~ ~.~ / DATE: OCT 262001
,,..._..~- 3-=--
· Alaska 0il & Gas Cons. Commission
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank yo~lchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _X Plugging _ Perforate _X
Pull tubing _ Alter casing _ Repair well _ Other_
2. Name of Operator
Phillips Alaska, Inc.
3. Address
P. O. Box 100360
Anchora~ie, AK 99510-0360
4. Location of well at surface
566' FNL, 217' FWL, Sec. 32, T11 N, R10E, UM
At top of productive interval
865' FNL, 1267' FEL, Sec. 5, T10N, R10E, UM
At effective depth
At total depth
1417' FNL, 4784' FEL, Sec. 4, T10N, R10E, UM
5. Type of Well:
Development _X
Exploratonj_
Stratigraphic_
Service__
(asp's 540285, 5948404)
(asp's 544127, 5942846)
(asp's 545894, 5942304)
6. Datum elevation (DF or KB feet)
RKB 121 feet
7. Unit or Property name
Kuparuk Unit
8. Well number
1 L-26A
9. Permit number / approval number
200-015
10. APl number
50-029-22173-01
11. Field / Pool
Kuparuk Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
11450 feet Plugs (measured)
6190 feet
Effective depth: measured 9610 feet Junk (measured)
true vertical 5952 feet
Bridge Plug @ 9610' MD.
Casing Length Size Cemented Measured Depth True vertical Depth
CONDUCTOR 123' 16" 200 Sx AS I 123' 123'
SURFACE 5105' 9-5/8" 850 Sx PF E, 580 Sx G 5225' 3601'
PRODUCTION 8380' 7" 250 Sx Class G 8500' 5401'
LINER 3145' 3-1/2" 608 Sx Class G 11450' 6190'
Perforation depth: measured
9559 - 9569'; 10420 - 10450'; 10470 - 10500'; 10530 - 10590'; 11040 - 11070'; 11275 - 11305'
true vertical
5944 - 5946'; 5936 - 5937'; 5937 - 5937'; 5937 - 5936'; 5994 - 6006'; 6103 - 6118'
Tubing(size, grade, and measured depth) 3.5", 9.3#, L-80, Tubing @ 8365' MD. RECEIVED
Packers & SSSV (type & measured depth) Baker ZXP Liner Packer @ 8312' MD.
Camco DS@535'MD. F'EB '~ 6 ~[~01
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
Alaska 0il & Gas Cons. Commission
Anchorage
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Md Water-Bbl Casing Pressure
Prior to well operation 80 461 1
Subsequent to operation
286 86 5
15. Attachments
Copies of Logs and Surveys run _
Daily Report of Well Operations ~X
16. Status of well classification as:
Oil __X Gas __ Suspended __ Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~, /~~ Title:
Tubing Pressure
163
157
Form 10-404 Rev 06/15/88 ·
SUBMIT IN DUPLICATE
1L-26A
DESCRIPTION OF WORK COMPLETED
PERFORATING & HYDRAULIC FRACTURE TREATMENT
6/4/00:
MIRU & PT equipment. RIH w/perforating gun & shot 30' of 'C4' & 'B' sand perforations as follows:
Added perforations:
11040 - 11070' M D
Used 2-1/2" HSD carrier & shot the perfs at 4 spf. POOH w/guns. RD.
7~5~00- 716100:
RIH w/CT & tagged PBTD at 11346' MD. Pumped gelled sand slurry to spot an isolation sand plug
across the lower open perforation interval located at:
11275 - 11305' MD
Made a final TOS tag at 11095' MD. POOH w/CT. RD.
7/7/00:
MIRU & PT equipment to 9500 psi. Pumped a Hydraulic Fracture Treatment, through the perforation
interval located above the isolation plug (listed above).
Pumped Breakdown stage @ 25 bpm, followed by Shutdown. Resumed pumping 50 bbls of 50#
Crosslinked Gel, followed by 50 bbls displacement fluid, followed by Shutdown.
Pumped Scour stage @ 20 bpm, followed by Shutdown. Resumed pumping 100 bbl Data Frac followed
by Shutdown. ISIP 2485.
Resumed pumping Frac Treatment w/180 bbls Pad @ 20 bpm, followed by Crosslinked Slurry stages,
w/proppant ramped up slowly from 1 to 10 ppa, followed by 66 bbls Flush, followed by Shutdown.
Placed a total of 53,142 lbs of 16/20 mesh proppant into the formation. RD.
718100:
Performed a CT proppant / sand plug cleanout to 11345' MD.
7/12/00:
Performed a CT fill cleanout to 11330' MD.
9/16/00- 9/17/00:
MIRU & PT equipment. RIH w/CT conveyed perforating guns & shot 120' of perforations in the 'C4' sand
as follows:
Added perforations:
10420 - 10450' MD
10470 - 10500' MD
10530 - 10590' MD
RECEIVED
FEB ]_ 6 2001
Alaska 0il & Gas Cons. Commission
Anchorage
Used 2.5" HSD carriers & shot all perfs at 4 spf at 60 degree phasing. POOH w/guns. RD.
1 L-26A
DESCRIPTION OF WORK COMPLETED
PERFORATING & HYDRAULIC FRACTURE TREATMENT
12/27/00:
RIH & set an HES 10000 psi HPHT Bridge Plug at 9610' MD.
12/28/00:
MIRU & PT equipment. RIH w/CT conveyed perforating guns & shot 10' of perforations in the 'C4' sand
as follows:
Added perforations:
9559 - 9569' MD
Used 2.5" HSD carriers & shot the perfs at 6 spf at 60 degree phasing. POOH w/guns. RD.
12/28/00:
MIRU after perforating & PT equipment to 9000 psi. Pumped a 'C4' Hydraulic Fracture Treatment,
through the perforation interval located above the Bridge Plug (listed above).
Pumped Breakdown stage w/20# Linear Gel @ 30 bpm, followed by Shutdown. ISIP @ 2933.
Resumed pumping 50 bbl TAF stage w/50# Crosslinked Gel @ 25 bpm, followed by displacement fluid @
25 bpm, followed by Shutdown. ISIP @ 3415.
Resumed pumping Data Frac w/50# Crosslinked Gel @ 20 bpm, followed by Shutdown.
Resumed pumping Frac Treatment w/300 bbls 50# Crosslinked Pad @ 20 bpm, followed by Crosslinked
Slurry stages, w/proppant ramped up slowly from I to 8 ppa, followed by 81 bbls Flush, followed by 20
bbls Diesel, followed by Shutdown.
Placed a total of 99,476 lbs of 12/18 mesh proppant into the formation. RD.
1/1/01:
Performed a CT fill cleanout to Bridge Plug at 9610' MD.
Returned the well to production w/lift gas & obtained a valid well test.
RECEIVED
FEB 1 G ZOO1
A~aska Oi~ & Gas Cons. Commission
Anchorage
n Ftl LLI i~ I:i
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Atm.: Loft Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
August 22, 2000
RE: MWD Formation Evaluation Logs 1L-26A, AK-MM-90263
The technical data listed below is being submitted herewith. Please address any problems or concerns
to the attention of.'
Jim Galvin, Sperry-Sun Ddlting Services, 5631 Silverado Way, ~G, Anchorage, AK 99518
1L-26A:
2" x 5" MD Resistivity & Gauuna Ray Logs:
50-029-22173-01
2"x 5" TVD Resistivity & Cranana Ray Logs:
50-029-22173-01
2"x 5"MD Neutron & Density Logs:
50-029-22173-01
2"x 5" TVD Neutron & Density Logs:
50-029-22173-01
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
AUG :! 3 2000
Alaska Oil & Gas Go'ns. C0mmissi0n
Anchorago
5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535
a Halliburton company
WELL LOG TRANSMITTAL
To:
State of Alaska.
Alaska Oil and Gas Conservation Comm.
Atm.: Loft Taylor
3001 Porcupine Dr.
Ancho~~...99501
MWD Formation Evaluation Logs
17, 2000
.0~,''~
°
1L-26A, AK-MM-90263
1 LDWG formatted Disc with verification listing.
APl#:. 50-029-221,73-01
PLEASE ACKNOWLEDGE RECEIPT-,llJg, SIGtgggG-Ah~II~~-A-C- O~-l:~l:li'.. ~:llAI~8..~nn~ITAL
Sperry-Sun Drilling Service
Atto:., Jim Galvin
5631 Silverado Way, Suite G.
Anchorage,.Alaska.99518
R£C[lV[D
Date:.~(~ 2 5 2000
Nas~ Oil a Gas Cons. CommisSion
~chorago
5631 Silverado Way, Suite G · Anchorage, AK 99518 · 907-273-3500 · Fax: 907-273-3535
a Halliburton comPany
PH "- .IPS Alaska, Inc.
Subsidiary of PHILLIPS PETROLEUM COMPANY
Post Office Box 100360
Anchorage, Alaska 99510-0360
Phone (907) 265-6120
Fax: (907) 265-6224
May 25, 2000
Mr. Robert Christenson
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Subject: 1L-26 and 1L-26A (Permit No. 91/69 & 200-015) Well Completion Reports
Dear Mr. Commissioner:
Enclosed is the well completion report for the abandonment of 1L-26 and the completion on
KRU 1L-26A.
If there are any questions, please call 265-6120.
Sincerely,
G. C. Alvord
Drilling Engineering Supervisor
Phillips Drilling
GCA/skad
STATE OF ALASKA
(,
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
I Status of well Classification of Service Well
Oil ['~ Gas D Suspended D Abandoned FI Service Fl
2. Name of Operator 7. Permit Number
Phillips Alaska, Inc. 200-015
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510-0360~ 50-029-22173-01
4. Location of well at surface ........ '~'1.;O¢_~~ 9. Unit or Lease Name
566' FNL, 217' FWL Sec. 32, T11N, RIOE, UM (ASP:540265, 5948404.6)i ' . .i ' Kuparuk River Unit
At Top Producing Interval i ~../. ~.~__~._: 10. Well Number
. . 1 L-26A
866' FNL, 1267' FEL, Sec. 5, T10N, R10E, UM (ASP:544127, 5942846) i Vi?,.:'- ~."i!.) :' ~ '11. Field and Pool
At Total Depth~
1417' FNL, 4784' FEL, Sec. 4, T10N, R10E, UM (ASP: 545894, 5942304) .';;-"--:,-- Kuparuk River Field
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Kuparuk River Pool
RBK 30' feetI ADL 25663, 25659, 25664 ALK 472
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. ~,,. J15.~ Water Depth, if offshore 16. No. of Completions
March 10, 2000 March 18, 2000 Ma_.~,J2,3-~n~ ~/Z'Tj "-'"~,¢~N/A feet MSL 1
17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost
11450' MD/6190' TVD 11356' MD/6143' TVD YES [] No FlI N/A feetMD 1600' (approx.)
22. Type Electric or Other Logs Run
GR/Res/Den/Neu, GR/CCL, CML
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
eASING SIZE WT. PER FT. GRADE TOP BO-FrOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED
16" 62.5# H-40 Surface 123' 24" 200 sx AS I
9.625" 36# J-55 Surface 5225' 12-1/4" 850 sx PF E, 580 sx Class G
7" 26# J-55 Surface 10045' 8.5" 250 sx Class G
3.5" 9.3# S LHT 8305' 11450' 6.125" 608 sx Class G
24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
3.5" 8365' 8312'
11275'-11305' MD 6103'-6118' TVD 4spf
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11275'-11305' MD 8000~ of 16 '20 prop behind p!pe. Loft 1300Q~. .
p~op in w.:.4bore
..... ,, o $ 200'0
27. PRODUCTION TEST ·
Date First Production Method of Operation (Flowing, gas lift, etc.)
May 21,2000 Gas Lift Oil .i;.,:.~:,,.!~ ~,.~!
Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE
5/21/2000 Test Period > 10 54 0 49.8Jl --5749
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr)
844 484 24-Hour Rate > 84 456 0 N/A
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips.
N/A
Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE (~ ~ Submit in duplicate
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity.
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Top Kuparuk C in western 9538' 5941'
fault block
Top Kuparuk C in eastern 11045' 5996'
fault block
Annulus left open - freeze protected with diesel.
31. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey I~
32. I hereby certify that the following is true and correct to the best of my knowledge. Questions? Call Bill Lloyd 265-6531 t~/,!~
Signed ~,4.~- ' ¢ ~. ~'~. Title Drilling E,gineering Supervisor Date ~//'Z _~'"/O__o
~/ "-' Chip Alvord !
INSTRUCTIONS
Prepared by Sharon AIIsup-Drake
General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and
leases in Alaska.
Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
Date: 05/11/00
ARCO ALASKA INC.
WELL SUMMARY REPORT
Page: 1
WELL:lL-26A
STATE:ALASKA
COUNTY: NORTH SLOPE EAST
FIELD: KUPARUK RIVER UNIT
SPUD:03/08/00 START COMP:
RIG:NABORS 16E
WI: 0% SECURITY:0
API NUMBER: 50-029-22173-01
BLOCK:
FINAL:
03/05/00 (D1)
TD/TVD: 0/0
SUPV:G.R. WHITLOCK
MW: 10.6 VISC:
0 PV/YP: 0/ 0
APIWL: 0.0
( o)
Prepare rig for skidding. Hold safety meeting. Prep rig for
move to 1L-26A.
03/06/00 (D2)
TD/TVD: 0/0
SUPV:G.R. WHITLOCK
MW: 0.0 VISC: 0 PV/YP: 0/ 0
0) MOVING RIG-RIG @ iF PAD
Move rig from 3H pad to iL pad.
APIWL: 0.0
03/07/00 (D3)
TD/TVD: 117/117
SUPV:FRED HERBERT
MW: 0.0 VISC: 0 PV/YP: 0/ 0
( 117) LEVEL PIT COMPLEX. RIG UP
Move rig to iL pad. Hold pre-spud meeting.
APIWL: 0.0
03/08/00 (D4)
TD/TVD: 117/117
SUPV:FRED HERBERT
MW: 11.8 VISC: 56 PV/YP: 31/34
0) TIH W/ WHIPSTOCK
APIWL: 4.6
Continue to move on pad and rig up. Rig accepted on well
1L-26A ~ 0700 hrs. 3/8/00. Remove tree. N/U BOPE. Test BOPE
250/5000 psi. PJSM. Run 6.125" gauge ring, GR, CCL.
03/09/00 (D5) MW: 11.8 VISC: 53 PV/YP: 27/31 APIWL: 4.0
TD/TVD: 8509/5406 (8392) P/U BHA
SUPV:FRED HERBERT
RIH. Set CIBP @ 8511'. POOH. RIH with mill assembly. RIH
"kw/Whipstock. Set Whipstock @ 8486'. Cut window from 8486'
to 8509'. Work and ream. Perform FIT to 14.5 EMW. Perform
FIT to 14.6 EMW.
03/10/00 (D6) MW: 11.8 VISC: 54 PV/YP: 28/33 APIWL: 5.2
TD/TVD: 8569/5438 ( 60) CIRC & COND FOR TRIP
SUPV:FRED HERBERT
POOH w/ window assy. PJSM. RIH. Orient tools and run thru
window. Drilling from 8509' to 8569'
03/11/00 (D7) MW: 11.8 VISC: 55 PV/YP: 27/36 APIWL: 4.0
TD/TVD: 8846/5621 ( 277) DRILLING @ 8949'
SUPV:FRED HERBERT
Drilling from 8569' to 8638'. Unable to maintain angle.
Circ sweep. Monitor well, POOH to shoe. Reset toolface
correction. RIH. Drilling from 8638' to 8846'
Date: 05/11/00
ARCO ALASKA INC.
WELL SUMMARY REPORT
Page: 2
03/12/00 (D8) MW: 11.8 VISC: 52 PV/YP: 26/29 APIWL: 4.2
TD/TVD: 9200/5835 ( 354) DRILLING @ 9340'
SUPV:FRED HERBERT
Drilling from 8846' to 9040'. Circ sweep around for wiper
trip. Monitor well. POOH to shoe. RIH to bottom. Drilling
from 9040' to 9200'
03/13/00 (D9) MW: 11.8 VISC: 49 PV/YP: 26/32 APIWL: 4.0
TD/TVD: 9578/5947 ( 378) SERVICE RIG & TOP DRIVE
SUPV:FRED HERBERT
Drilling from 9200' to 9477'. Circ bttms up for samples.
Drilling from 9477' to 9492'. Circ bttms up for samples.
Drilling from 9492' to 9578'
03/14/00 (D10) MW: 11.8 VISC: 48 PV/YP: 26/34 APIWL: 3.6
TD/TVD:10013/5949 ( 435) DRILLING AHEAD
SUPV:FRED HERBERT
Drilling from 9578' to 9615'. Circ sweep around for wiper
trip, monitor well. Wiper trip to shoe. Pump out. No
problems. RIH to bttm. Circ. Drilling from 9615' to 9623'
Circ. Drilling from 9263' to 10013'
03/15/00 (Dll) MW: 11.8 VISC: 51 PV/YP: 26/38 APIWL: 3.6
TD/TVD:10302/5935 ( 289) P/U BHA
SUPV:FRED HERBERT
Drilling from 10013' to 10302'. Circ densified sweep
around. Monitor well. Pump out of hole to shoe. Tight ~
9378' (packing off) work thru tight spot & condition. POOH.
PJSM.
03/16/00 (D12) MW: 11.8 VISC: 47 PV/YP: 24/30 APIWL: 3.8
TD/TVD:10570/5936 ( 268) DRILLING ~ 10775'
SUPV:FRED HERBERT
Test BOPE to 250/5000. RIH. Tight ~ 9380'. Work thru tight
spot. CBU. Drilling from 10302' to 10570'
03/17/00 (D13) MW: 11.8 VISC: 52 PV/YP: 27/34 APIWL: 3.8
TD/TVD:l1035/5991 ( 465) DRILLING AHEAD @ 11160'
SUPV:FRED HERBERT
Drilling from 10570' to 10838' Circ densified sweep
around. Drilling from 10838' to 11035'. Short trip to
9210'. Backream to 9210'. Tight @ 10720'. No problems
w/RIH. Break circ slowly. Circ bottoms up.
03/18/00 (D14) MW: 11.8 VISC: 50 PV/YP: 23/33 APIWL: 3.8
TD/TVD:l1450/6190 ( 415) POOH TO RUN LINER. PUMP OUT TO WINDOW
SUPV:FRED HERBERT
Circ bottoms up. Drilling from 11035' to 11192'. Pump
densified sweep around. Drilling from 11192' to 11450'
POOH to window. Pump out. Tight @ 11050' & 10710'. Monitor
well ~ window. RIH.
Date: 05/11/00
ARCO ALASKA INC.
WELL SUMMARY REPORT
Page: 3
03/19/00 (D15)
TD/TVD:l1450/6190 (
SUPV:FRED HERBERT
MW: 11.8 VISC: 51 PV/YP: 27/33
0) RIH W/ LINER
APIWL: 3.8
RIH, tight ~ 10700' Circ & condition for casing. Pump out
to window. No problems. Monitor well. Pump slug. POOH to
run liner. PJSM. Run 3.5" SLHT liner.
03/20/00 (D16) MW: 11.8 VISC: 50 PV/YP: 24/30 APIWL: 4.0
TD/TVD:l1450/6190 ( 0) POOH W/ RUNNING TOOL.
SUPV:FRED HERBERT
Run 3.5" SLHT liner. RIH w/DP. Circ and condition mud. RIH
w/liner. Tight @ 10700'. Rotate liner in hole from 10680'
to bottom. PJSM. Pump cement. Packing off and tight. Bump
plug. Set lliner hanger packer. Circ out excess cement.
03/21/00 (D17) MW: 0.0 VISC: 50 PV/YP: 0/ 0 APIWL: 0.0
TD/TVD:l1450/6190 ( 0) FREEZE PROTECTING WELL
SUPV:G.R WHITLOCK
Circ. Pump dry job. POOH. Safety meeting. Run 3.5" tubing.
Test casing/liner to 3500 psi. Displace mud with fresh
water and then seawater. Test tubingg to 3000 psi, OK. Test
annulus to 3000 psi, OK.
03/22/00 (D18)
TD/TVD:l1450/6190 (
SUPV:G.R WHITLOCK
MW: 0.0 VISC: 50 PV/YP: 0/ 0
0) RIG RELEASED TO 1L-20A
APIWL: 0.0
Freeze protect 3.5" tubing and annulus with diesel. Set BPV
and N/D stack. N/U tree and test to 250/5000 psi. Prep rig
to move while cleaning pits.
ARCO Alaska, Inc. KUPARUK RIVER UNIT
WELL SERVICE REPORT
'~' K1(1L-26A(W4-6))
WELL JOB SCOPE JOB NU'MBER "
1L-26A DRILLING SUPPORT-CAPITAL 0221001849.3
DATE DAILY WORK UNIT NUMBER
04/27/00 SCMT & PERF (COIL E-LINE) UNIT #1
DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR
3 YESI YES DS-BIGGERSTAFF RENNIE
FIELD AFC# CC# Signed
ESTIMATE AK0062 230DS10LG
Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann Initial Outer Ann I Final Outer Ann
0 PSI 0 PSI 500 PSI 950 PSI 0 PSII 0 PSI
DALLY SUMMARY
LOGGED E-COIL SCMT FROM PBTD @ 11,312' ELM TO 8100', GOOD CMT TO CMT TOP AT 8300'. PERFORATED 30'A SAND
11,275'-11,305' WITH 2.5" BH HSD GUNS, 4 SPF.
TIME LOG ENTRY
00:05 TIE INTO SHORT JOINT AT 10,967'. PU WT 21,500#.
00:20 CHECK DEPTH AT JT AT 11,197'. RIH, PUH TO STOP DEPTH AT 11,271.3'. GOOD PU WT. PUMP DOWN COIL,
ESTABLISH RETURNS AND PLACE 300 PSI WHP. EST FLUID COL 2450 PSI HYDROSTATIC. FIRE GUN, GOOD
INDICATION.
00:35 WATCH WHP FOR 5 MIN, ROSE SLOWLY TO 440 PSI, STILL RISING. BEGIN LOGGING UP.
00:50 POOH, PUMPING 1 BPM DIESEL DOWN COIL.
02:00 FP WELL FROM 3500' W/DIESEL.
02:35 OOH. ALL SHOTS FIRED. BEGIN RD.
04:35 RDMO DOW CTU #1.
11:30 MIRU DOW CT #1 BIGGERSTAFF/DECKERT
14:50 SAFETY MEETING. 2 SWS, 3 DOW, 1 ARCO.
15:00 FLOOD BS LINE, PT TO 4000 PSI.
15:15 RIH W/14,100' OF 1.75" X TAPERED COIL W/436,000 RUNNING FT. BHA IS 32' LONG: CENT, SCMT, CENT,
COMP SUB, PSP, CTLH. TAKING RETURNS TO TIGER.
16:05 WT CHECK: 12000# @ 5000'.
16:30 WT CHECK: 17,500# AT 8000'.
16:50 WT CHECK: 21,000# AT 10,000'.
17:10 TIE IN TO TOP KUP SIGNATURE ACROSS SHORT JOINT AT 10960'. WILL SERVE AS CBL RPT SECTION.
CONTINUE RIH.
17:30 TAG BOTTOM AT 11,312' ELM PICKUP DEPTH. BEGIN LOGGING UP AT 30 FPM, TRICKLING DIESEL DOWN
BACKSIDE.
17:45 SEEING WATER AT MM. PUMP 6 BBL TO TIGER TO GET CLEAN DIESEL. CONTINUE TRICKLING DIESEL
DOWN BACKSIDE.
19:15 COMPLETE LOGGING AT 8100'. SAW GOOD CMT THRUOUT PAY INTERVALS; TOP CMT OBSERVED AT 3.5" X
7" PKR AT 8330'. POOH, PUMPING 1 BPM DIESEL DOWN COIL.
ARCO Alaska, Inc.
KUPARUK RIVER UNIT
WELL SERVICE REPORT
~' K1(1L-26A(W4-6))
WELL JOB SCOPE JOB NU'rvlBER ' "
1 L-26A FRACTURING. 0428001957.2
DATE DAILY WORK UNIT NUMBER
05/12/00 MEMORY LOG/PERFORATE UN IT #3
DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR
1 YESI YES DS-CORLIS GOBER
FIELD AFC# CC# Signed
ESTIMATE AK0063 230DS10LG
Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann I Initial Outer Ann I Final Outer Ann
600 PSI 40 PSI 0 PSI 0 PSII 0 PSII 0 PSI
DALLY SUMMARY
TAG BOTTOM AT 11367' CTM - RUN MEMORY GR/CCL LOG FROM 11367' CTM TO 10800' CTM - PERF 11290' RKB TO 11295'
RKB W/2-1/2" HC, BH, 4SPF, 180 DEG PHASING - ATTEMPT TO PUMP INTO WELL - PRESSURED UP TO 3000 PSI AND BLED
DOWN SLOWLY - FREEZE PROTECT WELL TO 2500' CTM[Perf]
TIME
06:30
07:00
08:00
08:45
09:00
09:45
10:20
10:35
11:00
12:15
13:20
13:40
14:05
LOG ENTRY
MIRU DS CTU - 1.75" TAPERED STRING - 652K RF
MU RADIUS 2.2" MHA CONSISTING OF COIL CONNECTOR, HYD DISCONNECT (3/4" BALL), BLANK CIRC SUB,
AND PORTED XO - PULL TEST CONNECTOR TO 18000 LBS - PRESSURE TEST MHA TO 3800 PSI - ALL OK
MU PDS LOGGING GR/CCL LOGGING TOOLS - TOTAL BHA LENGTH = 11'
TGSM - MUSTER AREA BY FRAC TANKS - DISCUSS H2S MONITORS
OPEN UP WELL - BEGIN RIH W/CT AND LOGGING TOOLS
WEIGHT CHECKS - 16000 LBS @ 7730' CTM - 24000 LBS @ 11290' CTM
TAG DOWN AT 11367' CTM - PU AND LOG AT 40 FPM TO 10800' CTM - WAIT 2 MIN AFTER MAIN PASS
RIH TO 11360' CTM - LOG UP TO 11200' OTM AT 40 FPM - FLAG PIPE - LOG UP TO 10800' CTM
POOH W/CT AND TOOLS
OUT OF HOLE W/CT - CLOSE IN WELL - BD LOGGING TOOLS AND DOWNLOAD DATA - ALL DATA RECOVERED
TGSM - DISCUSS SAFE HANDLING OF PERF GUNS - MUSTER AREA REMAINS BY FRAC TANKS -
SCHLUMBERGER WILL HANDLE MAKING UP THE GUNS - FRAC CREW ON LOCATION - DISCUSS JOB PLAN
WITH FRAC CREW
PRESSURE TEST MHA TO 3400 PSI - ALL OK - MU SCHLUMBERGER 2.125" FIRING HEAD AND 5', 2-1/2" HC
GUN LOADED 4 SPF, 180 DEG PHASING, BIG HOLE CHARGES
PRESSURE TEST BOP, LUBRICATOR, AND SURFACE EQUIPMENT TO 2000 PSI W/CT ISOLATED - SLOWLY
BLEED OFF PRESSURE - LEAVE CHOKE OPEN
TIME
LOG ENTRY
14:15 OPEN UP WELL - RIH W/CT
15:45 10150' CTM - WEIGHT CHECK 20500 LBS
15:55
16:05
RUN PAST FLAG - PU TO FLAG DEPTH - PULLING 22000 LBS - RESET COUNTER TO 11179' RKB (10'
CORRECTION FROM CTM TO RKB)
RIH TO 11310' RKB - DROP 5/8" ALUMINUM BALL- START PUMPING DIESEL AT 1.5 BPM - PU TO STOP DEPTH
OF 11282.7' RKB - TOP SHOT AT 11290' RKB
16:30 25 BBLS AWAY - SLOW PUMP RATE DOWN TO 0.5 BPM - BALL HIT WITH 29 BBLS AWAY - GUNS FIRED AT 2700
PSI - PERF 11290' RKB TO 11295' RKB
16:40 POOH W/CT AND GUNS
18:00 OUT OF HOLE WITH CT - TRY TO PUMP INTO WELL AT 1 BPM - WELL PRESSURED UP TO 3000 PSI -
BLEEDING DOWN SLOWLY
18:30 REMOVE BOP AND LUBRICATOR FROM WELLHEAD - BD GUNS - ALL SHOTS FIRED - MU 1.75" COLD ROLL, 2"
CHECKS, AND 2.25" NOZZLE
18:50 PRESSURE TEST BOP AND LUBRICATOR TO 2000 PSI - ALL OK
19:00 OPEN UP WELL - RIH PUMPING SLICK DIESEL AT 1.5 BPM
19:20 2500' CTM - STOP RIH - BEGIN POOH LAYING IN SLICK DIESEL FOR FREEZE PROTECT
19:30 OUT OF HOLE WITH CT - CLOSE IN WELL
21:30 RDMO DS
ARCO Alaska, Inc.
KUPARUK RIVER UNIT
WELL SERVICE REPORT
K1(1L-26A(W4-6))
WELL JOB SCOPE JOB NU'MBER ' "
1 L-26A FRACTURING. 0428001957.2
DATE DAILY WORK UNIT NUMBER
05/13/00 FRACTURE A5 SAND (2ND ATTEMPT)
DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR
2 NOI NO DS-YOAKU M FERG USON
FIELD AFC# CC# Signed
ESTIMATE AK0063 230DS10LG
Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann , Initial Outer Ann , Final Outer Ann
1057 PSI 0 PSI 0 PSI 0 PSII 10 PSI 0 PSI
DALLY SUMMARY
PERFORM PREPAD/BREAKDOWN WITH 250 BBLS OF LINEAR GEL FOLLOWED BY 20 BBLS OF X/L'D 50# GEL FOR SCOUR
AND EXCESS FRICTION REDUCTION. PERFORM DATAFRAC AND ADJUST FRAC DESIGN BASED ON RESULTS. HIGH
TREATING PRESSURES. SCREENED OUT FRAC WITH 8000 #'S OF 16/20 PROP BEHIND PIPE WITH MAX CONC OF 2 PPA.
LEFT 13000#'S PROP IN WELLBORE. FORMATION TREATING VERY TIGHT, POSSIBLY NON-RESERVOIR QUALITY BASED ON
PRESSURE ANALYSIS.******LEFT A SMALL AMOUNT OF TREESAVER RUBBER IN WELL ...... [Frac-Refrac]
TIME
LOG ENTRY
09:30 ARRIVE LOCATION, DOWELL BEGIN RU PUMP EQUIPMENT
11:15 SAFETY MEETING, MUSTER AREA
12:15
12:17
12:20
12:40
12:50
13:20
14:30
14:35
14:45
15:25
16:00
START PREPAD OF 20 # LINEAR GEL AT 25 BPM, INCREASE RATE TO 28 BPM AND 7800 PSI, NO SIGNIFICANT
BREAKBACK.
AFTER 250 BBLS 20 #,PUMP 20 BBLS 50# X/L TO ASSIST WITH BREAKDOWN, NO SIGNIFICANT
IMPROVEMENT, ATTEMPT SDT, PRESSURE INCREASING AS RATE REDUCED, ABORT TEST
PLAN TO USE TAF FLUID TECHNIQUE BY SPOTTING 50 BBLS 50 # X/L GEL ABOVE PERFS AND ALLOWING TO
BUILD GEL STRENGTH, THEN DISPLACING AT HIGH RATE
BEGIN DISPLACING 50 # X/L SLUG AT 20 BPM AND 6056 PSI. SD WITH SLUG AT PERFS.
COME ONLINE AND DISPLACE 50# X/L AT UP TO 25 BPM. PERFORM SDT AND ANALYZE XS FRICTION.
ISIP=2600PSI, FG=0.88 PSI/FT, NWBPL=903 PSI AT 19 BPM
START 150 BBL DATAFRAC OF 50# X/L GEL AT 20 BPM
ANALYZE DF. TC=4.2 MIN, ISIP=2734, EFF=27%, CT=.0035
ADJUST PROP FRAC DESIGN BASED ON DF
START FRAC AT 20 BPM, 250 BBLS PAD
NEAR WELLBORE SCREENOUT WITH 8000#'S 16/20 BEHIND PIPE. 2 PPA ON FORMATION. LEFT 13000#'S OF
PROP IN WELLBORE.
RDMO
04-May-00
AOGCC
Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Re: Distribution of Survey Data for Well 1L-26A
Dear Lori Taylor:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
8,193.50' MD
8,486.00' MD
11,450.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
E i r EE
MAY 1 6 ~000
Alaska Oil & Gas Cons. Commission
Anchorage
North Slope Alaska
Alaska State Plane 4
Kuparuk 1L
1L-26A
Surveyed: 18 March, 1900
~oc), Ol ~-'-'
SURVEY REPORT
4 May, 2000
Your Ref: 500292217301
Surface Coordinates: 5948404.56 N, 540284.63 E (70° 16' 11.8964" N, 149° 40'27.1756" W)
Kelly Bushing: 120.50ft above Mean Sea Level
RECEIVED
MAY 1 6 2000
Alaska 0tl & Gas Cons, Oommismor
Anchorage
0 FI I I.. I- I IM I~ SeRVlr'IE5
Survey Ref: svy9156
Sperry-Sun Drilling Services
Survey Report for 1L-26A
Your Ref: 500292217301
Surveyed: 18 March, 1900
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
8193.50 58.200 147.200 5116.71 5237.21
8200.00 58.180' 147.170 5120.13 5240,63
8300.00 57.900 146.640 5173.06 5293.56
8400.00 57.620 146.120 5226.41 5346.91
8486.00 57.350 145.590 5272.64 5393.14
8535.86 55.260 141.100 5300.31 5420.81
8568.22 51.570 141.000 5319.59 5440.09
8599.04 48.460 139.000 5339.39 5459.89
8632.00 46.190 138.500 5361.74 5482.24
8667.37 47.580 136.440 5385.91 5506.41
8691.73 48.870 133.970 5402.14 5522.64
8730.15 49.530 128.800 5427.25 5547.75
8763.17 49.790 125.770 5448.63 5569.13
8790.64 49.610 121.690 5466.40 5586.90
8824.15 49.270 117.000 5488.20 5608.70
8855.97 48.310 111.430 5509.17 5629.67
8887.85 47.220 104.620 5530.61 5651.11
8924.44 47.510 96.410 5555.42 5675.92
8953.90 48.580 91.490 5575.12 5695.62
8984.02 50.110 90.810 5594.75 5715.25
9017.60 51.980 90.540 5615.86 5736.36
9048.30 53.600 90.450 5634.42 5754.92
9079.21 55.580 89.930 5652.33 5772.83
9113.45 57.650 89.590 5671.17 5791.67
9145.22 58.390 89.600 5688.00 5808.50
5158.69 S 2878.62 E
5163.33 S 2881.61E
5234.41 S 2927.94 E
5304.84 S 2974.77 E
5364.86 S 3015.47 E
5398,14 S 3040.21 E
5418.34 S 3056.54 E
5436.44S 3071,71E
5454.66 S 3087.69 E
5473.68 S 3105.14 E
5486.56 S 3117.94 E
5505.77 S 3139.75 E
5521.02 S 3159.78 E
5532.65 S 3177.19 E
5545.12 S 3199.37 E
5554.94 S 3221.18 E
5562.24 S 3243.60 E
5567.14 S 3270.02 E
5568.64 S 3291.87 E
5569.10 S 3314.71 E
5569.41S 3340.82 E
5569.62 S 3365.27 E
5569.70 S' 3390.46 E
5569.58 S 3419.05 E
5569.39 S 3446.00 E
Alaska State Plane 4
Kuparuk 1L
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(ft) (fi) (o/lOOft) (ft)
Comment
5943261.35 N 543190.82 E
5943256.72 N 543193.84 E
5943185.89 N 543240.54 E
5943115.71 N 543287.75 E
5943055.91 N 543328.77 E
5943022.77 N 543353.69 E
5943002.65 N 543370.13 E
5942984.64 N 543385.40 E
5942966.51 N 543401.47 E
5942947.58 N 543419.02 E
5942934.76 N 543431.89 E
5942915.67 N 543453.81 E
5942900.53 N 543473.91 E
5942889.00 N 543491.39 E
5942876.65 N 543513.63 E
5942866.94 N 543535.50 E
5942859.76 N 543557.95 E
5942855.00 N 543584.40 E
5942853.61N 543606.25 E
5942853.28 N 543629.10 E
5942853.11 N 543655.21 E
5942853.03 N 543679.66 E
5942853.08 N 543704.85 E
5942853.36 N 543733.44E
5942853.69 N 543760.39 E
4479.49
0.499 4483.90
0.530 4551.88
0.521 4620.10
0.607 4678.99
8.584 4713.68
11.406 4735.97
11.248 4756.44
6.977 4777.72
5.789 4800.66
9.231 4817.11
10.329 4844.21
7.038 4868.25
11.346 4888.61
10.680 4913.73
13.507 4937.59
16.176 4961.15
16.520 4987.64
12.938 5008.67
5.361 5030.27
5.604 5054.89
5.282 5077.91
6.551 5101.59
6.102 5128.39
2.329 5153.62
RECEIVED
MAY 1 6 2000
Tie-on to 1L-26 Survey
Interpolated Azimuth
Interpolated Azimuth
Interpolated Azimuth
Window Point (Top of
Whipstock)
Continued...
4 May, 2000- 18:35
.2-
Alaska 0il & Gas Cons. C0rnmlss;or DrillQuest 1.05.04e
Anchorage
Sperry-Sun Drilling Services
Survey Report for 1L-26A
Your Reft 500292217301
Surveyed: 18 March, 1900
North Slope Alaska
Measured
Depth
(ft)
Incl. Azim.
9175.96 59.530 89.450
9209.19 61.720 88.830
9241.14 64.350 87.950
9272.30 66.680 88.170
9306.01 69.010 88.070
9337.09 70.940 89.250
9366.96 72.470 90.080
'9396.71 73.630 91.980
9418.74 74.900 93.260
9431.80 75.540 94.100
9460.87 77.020 95.790
9494.31 78.820 96.060
9526.39 80.230 97.470
9556.36 80.830 99.390
9593.24 81.260 - 101.610
9624.92 82.870 102.810
9652.53 85.660 103.180
9691.08 88.950 102.990
9723.20 90.920 103.340
9750.02 92.550 103.010
9788.35 92.740. 103.300
9820.17 92.960 104.700
9848.13 93.320 103.930
9878.55 93.170 106.350
9910.20 93.510 105.960
Sub-Sea
Depth
(ft)
57O3.85
5720.15
5734.63
5747.55
5760.26
5770.90
5780.28
5788.95
5794.93
5798.26
5805.15
5812.15
5817.98
5822.91
5828.66
5833.03
5835.79
5837.60
5837.64
5836.82
5835.06
5833.47
5831.94
5830.22
5828.38
Alaska State Plane 4
Kuparuk 1L
Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Northings Eastings Northings Eastings Rate Section
(ft) (fi) (fi) (fi) (ft) (°ll00ft) (ft)
5824.35 5569.17 S 3472.33 E 5942854.05 N 543786.72 E 3.732 5178.27
5840.65 5568.74 S 3501,29 E 5942854.64 N 543815.67 E 6.788 5205,30
5855.13 5567.93 S 3529.75 E 5942855.60 N 543844.13 E 8.590 5231.74
5868.05 5566,97 S 3558.09 E 5942856.71 N 543872.46 E 7.505 5258.02
5880.76 5565,95 S 3589.29 E 5942857.90 N 543903.66 E 6.917 5286.96
5891.40 5565.27 S 3618.48 E 5942858.74 N 543932.85 E 7.161 5314.13
5900.78 5565.10 S 3646.84 E 5942859.06 N 543961.20 E 5.762 5340.69
5909,45 5565.62 S 3675.29 E 5942858.69 N 543989.66 E 7.247 5367.58
5915.43 5566.59 S 3696.47 E 5942857.84 N 544010.84 E 8.032 5387.80
5918.76 5567.40 S 3709.07 E 5942857.09 N 544023.45 E 7.918 5399.91
5925.65 5569.83 S 3737.21 E 5942854.81 N 544051.59 E 7.604 5427.16
5932.65 5573,21 S 3769.73 E 5942851.61 N 544084.14 E 5.440 5458.85
5938.48 5576.92 S 3801.05 E 5942848.06 N 544115.48 E 6.164 5489.54
5943.41 5581.26 S 3830.30 E 5942843.88 N 544144.74 E 6.629 5518.48
5949.16 5587.90 S 3866.11 E 5942837,44 N 544180.60 E 6.059 5554.40
5953.53 5594.53 S 3896.78 E 5942830.96 N 544211.30 E 6.317 5585.47
5956.29 5600.71 S 3923.54 E 5942824.93 N 544238.09 E 10.193 5612.73
5958.10 5609.43 S 3961.05 E 5942816.41 N 544275.64 E 8.549 5650.94
5958,14 5616.74 S 3992.32 E 5942809.27 N 544306.96 E 6.229 5682.82
5957.32 5622.85 S 4018.42 E 5942803,30 N 544333.09 E 6.201 5709.43
5955.56 5631.57 S 4055.71 E 5942794.78 N 544370,42 E 0.904 5747.43
5953.97 5639.25 S 4086.54 E 5942787.26 N 544401.30 E 4.448 5779.03
5952.44 5646.16 S 4113.59 E 5942780.50 N 544428.38 E 3.036 5806.80
5950.72 5654.09 S 4142.91 E 5942772.73 N 544457.74 E 7.958 5837.05
5948.88 5662.88 S 4173.26 E 5942764.10 N 544488.14 E 1.633 5868.57
Comment
R£CEIVF_D
MAY 1 6 2000
Continued...
4 May, 2000 - 18:35
-3-
Alaska Oil & Gas Cons. Commissior. DrillQuest 1.05.04e
Anchorage
Sperry-Sun Drilling Services
Survey Report for 1L-26A
Your Ref: 500292217301
Surveyed: 18 March, 1900
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
Sub-Sea
Depth
(ft)
Vertical Local Coordinates
Depth Northings Eastings
(ft) (ft) (ft)
9938.82 91.570 -105.550 5827.11 5947.61 5670.64 S 4200.77 E
9975.12 89.230 105.860 5826.85 5947.35 5680.47 S 4235.71 E
10007.20 89.140 106.050 5827.31 5947.81 5689.29 S 4266.56 E
10040.80 89.140 106.010 5827.81 5948.31 5698.56 S 4298.85 E
10070.00 90.090 106.640 5828.01 5948.51 5706.77 S 4326.87 E
10102.50 92.800 105.860 5827.19 5947.69 5715.86 S 4358.06 E
10134.60 93.940 105.440 5825.30 5945.80 5724.51 S 4388.91 E
10167.90 94.000 105.630 5823.00 5943.50 5733.40 S 4420.92 E
10200.20 94.060 105.310 5820.73 5941.23 5742.00 S 4451.97 E
10227.20 94.110 105.290 5818.81 5939.31 5749.10 S 4477.95 E
10293.70 92.220 105.500 5815.13 5935.63 5766.73 S 4541.96 E
10332.80 91.260 104.120 5813.95 5934.45 5776.72 S 4579.74 E
10364.80 89.110 103.510 5813.84 5934.34 5784.36 S 4610.81 E
10392.20 88.030 105.780 5814.53 5935.03 5791.28 S 4637.31 E
10429.70 88.400 108.200 5815.70 5936.20 5802.24 S 4673.16 E
10461.50 90.120 109.840 5816.11 5936.61 5812.60 S 4703.22 E
10487.70 90.430 110.510 5815.98 5936.48 5821.63 S 4727.81 E
10526.90 90.280 112.790 5815.74 5936.24 5836.09 $ 4764.24 E
10559.40 90.220 112.740 5815.60 5936.10 5848.67 S 4794.21 E
10589.60 90.280 112.980 5815.46 5935.96 5860.40 S 4822.04 E
10623.00 90.090 112.560 5815.36 5935.86 5873.33 S 4852.83 E
10654.90 89.820 113.260 5815.38 5935.88 5885.75 S 4882.22 E
10685.10 90.120 113.710 5815.40 5935.90 5897.78 S 4909.91 E
10719.00 89.910 112.690 5815.39 5935.89 5911.14 S 4941.07 E
10751.70 88.680 112.320 5815.79 5936.29 5923.65 $ 4971.28 E
Alaska State Plane 4
Kuparuk 1L
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (ft) (°/100ft) (fl)
4 May, 2000 - 18:35
-4-
6.928 5897.08
6.503 5933.27
0.655 5965.26
0.119 5998.77
3.904 6027.90
8.677 6060.31
3.784 6092.26
0.597 6125.37
1.006 6157.48
0.199 6184.32
2.860 6250.48
4.298 6289.39
6.984 6321.20
9.172 6348.46
6.525 6385.88
7.473 6417.67
2.818 6443.87
5.829 6483.05
0.240 6515.52
0.819 6545.68
1.380 6579.05
2.352 6610.91
1.791 6641.06
3.072 6674.91
3.928 6707.58
5942756.48 N 544515.69 E
5942746.84 N 544550.69 E
5942738.19 N 544581.57 E
5942729.09 N 544613.91 E
5942721.03 N 544641.98 E
5942712.11N 544673.22 E
5942703.63 N 544704.12 E
5942694.90 N 544736.17 E
5942686.47 N 544767.27 E
5942679.51N 544793.28 E
5942662.22 N 544857.39 E
5942652.44 N 544895.23 E
5942644.96 N 544926.34 E
5942638.18 N 544952.87 E
5942627.42 N 544988.78 E
5942617.22 N 545018.89 E
5942608.31 N 545043.53 E
5942594.05 N 545080.04 E
5942581.63 N 545110.07 E
5942570.05 N 545137.96 E
5942557.29 N 545168.83 E
5942545.03 N 545198.28 E
5942533.14 N 545226.04 E
5942519.95 N 545257.27 E
5942507.60 N 545287.54 E
RECEIVED
! 6 000
Alaska Oil & Gas Cons. C0m.m~ss~or,
Anchorage
Comment
Continued...
DrillQuest 1.05.04e
Sperry-Sun Drilling Services
Survey Report for 1L-26A
Your Ref: 500292217301
Surveyed: 18 March, 1900
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
10779.40 87.200 111.530 5816.79 5937.29 5933.99 S 4996.96 E
10815.20 84.760 110.760 5819.30 5939.80 5946.87 S 5030.26 E
10846.60 83.210 110.160 5822.59 5943.09 5957.78 S 5059.52 E
10877.30 80.700 109.720 5826.88 5947.38 5968.15 S 5088.09 E
10911.00 78.230 109.450 5833.04 5953.54 5979.26 S 5119.30 E
10942.90 75.670 108.270 5840.25 5960.75 5989.30 S 5148.71 E
10971.00 72.120 107.720 5848.04 5968.54 5997.64 S 5174.38 E
11004.50 68.420 107.610 5859.35 5979.85 6007.21 S 5204.42 E
11036.90 66.390 108.260 5871.80 5992.30 6016.42 S 5232.88 E
11068.10 65.870 108.040 5884.42 6004.92 6025.31 S 5259.99 E
11102.00 64.680 107.870 5898.60 6019.10 6034.80 S 5289.28 E
11133.90 61.940 107.680 5912.93 6033.43 6043.50 S 5316.42 E
11165.60 60.580 107.920 5928.17 6048.67 6052.00 S 5342.89 E
11262.90 60.320 108.420 5976.16 6096.66 6078.39 S 5423.31 E
11351.50 60.050 108.860 6020.21 6140.71 6102.96 S 5496.15 E
11389.60 60.030 109.130 6039.23 6159.73 6113.70 S 5527.36 E
11450.00 60.030 109.130 6069.41 6189.91 6130.85 S 5576.79 E
Alaska State Plane 4
Kuparuk 1 L
Global Coordinates Dogleg Vertical
Northings Eastings Rate Section
(fi) (fi) (°/100fi) (fi)
6.056 6735.25
7.145 6770,95
5.289 6802.18
8.298 6832.57
7.372 6865.70
8.797 6896.77
12.773 6923.74
11.049 6955.24
6.533 6985.13
1.787 7013.64
3.540 7044.41
8.606 7072.88
4.341 7100.65
0.521 7185.25
0.528 7262.09
0.616 7295.10
0.000 7347.41
5942497.40 N 545313.28 E
5942484.70 N 545346.65 E
5942473.94 N 545375.96 E
5942463.73 N 545404.59 E
5942452.79 N 545435.86 E
5942442.90 N 545465.32 E
5942434.70 N 545491.04 E
5942425.29 N 545521.13 E
5942416.23 N 545549.64 E
5942407.49 N 545576.79 E
5942398.16 N 545606.14 E
5942389.60 N 545633.32 E
5942381.25 N 545659.83 E
5942355.28 N 545740.39 E
5942331.10 N 545813.36 E.
5942320.53 N 545844.63 E
5942303.64 N 545894.16 E
Comment
Projected Survey
All data is in feet unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.574° (11-Mar-00)
The Dogleg Severity is in Degrees per 100ft.
Vertical Section is from Well and calculated along an Azimuth of 110.150° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11450.00ft.,
The Bottom Hole Displacement is 8287.82ft., in the Direction of 137.709° (True).
RECE[VE'D
Miry 1 6 5000 Continued...
Alaska 0il & Gas Cons. [;0m.missior, DrillQuest hO5.04e
4 May, 2000 - 18:35
Sperry-Sun Drilling Services
Survey Report for 1L-26A
Your Reft 500292217301
Surveyed: 18 March, 1900
North Slope Alaska
Alaska State Plane 4
Kuparuk 1L
Comments
Measured Station Coordinates
Depth TVD Northings Eastings
(ft) (ft) (ft) (ft)
8193.50 5237.21 5158.69 S 2878.62 E
8200.00 5240.63 5163.33 S 2881.61 E
8300.00 5293.56 5234.41 S 2927.94 E
8400.00 5346.91 5304.84 S '2974.77 E
8486.00 5393.14 5364.86 S 3015.47 E
11450.00 6189.91
6130.85 S 5576.79 E
Comment
Tie-on to 1L-26 Survey
Interpolated Azimuth
Interpolated Azimuth
Interpolated Azimuth
Window Point (Top of Whipstock)
Projected Survey
Survey tool program
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0.00
To
Measured Vertical
Depth Depth
(ft) (ft)
11450.00 6189.91
Survey Tool Description
MWD Magnetic
4 May, 2000 - 18:35
-6-
RECEIVED
1 6 2000
Alaska Oil & Gas Cons. Oommission
~nr. ho~'~Q8
DrillQuest 1.05. 04e
5/12/00
Scblumberg
NO. 136
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Kuparuk
Color
Well Job # Log Description Date BL Sepia Print CD
2C-03 Ct (eL- INJECTION PROFILE 000502 I 1
2V-08A v,., LEAK DETECTION LOG 000502 I 1
1C-26 CL~c.. 20079 RST ..~ (~5"t 000202 I I 1
1 L-26A 20192 SCMT 000427 1
2H-17 20195 SCMT 000506 1
SlGNED:~~
DATE:
MAY 1 9 2000
Alaska Oil & Gas cu:~5. ~ummissl0n
Anchorage
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you.
5/3/OO
Schlmberger
NO. 110
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Kuparuk
Color
Well Job # Log Description Date BL Sepia Print
1L-26A GAMMA RAY COLLARS 000427 I 1
1Q-06 LEAK DETECTION LOG 000425 I 1
1Y-12 C~(~ INJECTION PROFILE 000418 I 1
1R-01A RST WFL W/PROD PROFILE 000423 I 1
,,
~ i i · iii II ·
Please sign and return one~opy of this
DATE: M~Y 1 2 2000
Alaska 0ii & Gas Cons. commissi0~
transmittal to Sherrie at the above address or fax to (907) 561-8317. Th6~9~.8
Re: 1L-26a Deepening PTD 200-015
oo -- t_S'--
Subject: Re: 1L-26a Deepening PTD 200-015
Date: Mon, 20 Mar 2000 12:59:38 -0900
From: Blair Wondzell <blair_wondzell~admin.state.ak.us>
Organization: State of Alaska, Dept of Admin, Oil & Gas
To: William B Lloyd <WLLOYD@mail.aai.arco.com>
Bill,
This proposal is within our guidelines for changes that do not need formal (written)
approvals.
Thanks for the heads-up. Blair Wondzell 3/20/00.
William B Lloyd wrote:
Blair,
Nabors 16e is currently drilling in the 6-1/8" interval in the referenced
sidetrack. We are presently drilling at ~82 degrees at ~11023' Permitted TD
for this well is 11356' MD and 6121' TVD at the top of the A sand.
This wellbore targets an undeveloped fault block, primarily in the C sand at the
toe of the well. The question came up today that if the C sand is poorly or
undeveloped in the block, should we drill to the A sand as a secondary target.
Recognizing the cost associated with a new penetration, the decision was made to
drill deeper through the A sand.
At this point it is anticipated the A sand will have a TVD thickness of ~80'
It is estimated our total additional MD will be 350 - 400' but will be less than
500' vertical section. This puts us less than the required 500' for a new
permit.
Please confirm your reciept of this email and let me know if you concur with
this plan.
Sincerely,
Bill Lloyd
Senior Drilling Engineer
AAI Drilling
265-6531
275-7467 (pager)
I of I 3/20/00 1:00 PM
1L-26a Deepening
Subject: 1L-26a Deepening
Date: Fri, 17 Mar 2000 16:50:59 -1000
From: "William B Lloyd" <WLLOYD@mail.aai.arco.com>
To: blair_wondzell~admin.state.ak.us
· ,
Blair,
Nabors 16e is currently drilling in the 6-1/8" interval in the referenced
sidetrack. We are presently drilling at ~82 degrees at -11023' Permitted TD
for this well is 11356' MD and 6121' TVD at the top of the A sand.
This wellbore targets an undeveloped fault block, primarily in the C sand at the
toe of the well. The question came up today that if the C sand is poorly or
undeveloped in the block, should we drill to the A sand as a secondary target.
Recognizing the cost associated with a new penetration, the decision was made to
drill deeper through the A sand.
At this point it is anticipated the A sand will have a TVD thickness of -80'
It is estimated our total additional MD will be 350 - 400' but will be less than
500' vertical section. This puts us less than the required 500' for a new
permit.
Please confirm your reciept of this email and let me know if you concur with
this plan.
Sincerely,
Bill Lloyd
Senior Drilling Engineer
AAI Drilling
265-6531
275-7467 (pager)
1 of I 3/20/00 8:48 AM
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COPlMISSION
3001 PORCUPINE DRIVE
ANCHORAGE. ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Chip Alvord
Drilling Engineering Supervisor
ARCO Alaska, Inc.
P O Box 100360
Anchorage, AK 99510-0360
Re:
Kuparuk River Unit 1L-26A
ARCO Alaska, Inc.
Permit No: 200-015
Sur Loc: 566'FNL, 217'FWL, Sec. 32, TllN, R10E, UM
Btmhole Loc. 1418'FNL, 455'.FWL, Sec. 4, T10N, R10E, UM
Dear Mir. Alvord:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Robert N. Christenson, P.E.
Chair
BY ORDER OF TH~OMMISSION
DATED this [O *'"" day of .February, 2000
dlf/Enclosurcs
cc: Department of Fish & Ganlc. Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. TyCec~;wo~k: D¢ill' [~]'R~drill BI '{"lb. Typeof~ell.'" Exploratory E] "~'t';~ii'graphicTesiE] D'evelopmentoil[~] .......
Re-ent~ D Deepen D Sewice D DevelopmentG~ D single Zone ~ Multiple Zone D
2. Name of Operator 5. Datum elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. RKB 121 feet
3. Addr~s 6. Proper~ Designation 2¢~, Kuparuk River Field
P.O. Box 100360 Anchorage, AK 99510-0360 ADL 25663 ALK 472 ~¢~~, Kuparuk River Pool
4. Location of well at suffice 7. Unit or proper~ Name 11. Type Bond (s~ 2o ~c 25.o251)
566' FNL, 217' FWL, Sec. 32, T11 N, R10E, UM Kuparuk River Unit Statewide
At top of productive interval 8. Well number Number
1287' FNL, 100' FWL, Sec. 4, T10N, R10E, UM 1L-26A ¢U-630610
At total depth 9. Approximate spud date Amount
1418' FNL, 455' FWL, Sec. 4, T10N, R10E, UM Februaw 20, 2000 $200,000
12. Distance to nearest proper~ line 13. Distance to nearest well 14. Number of acres in proper~ 15. Proposed depth (MD and TVD)
100 G Target feet none feet 2560 11356 ' MD / 6121 ' TVD
16. To be completed for deviated wells 17. Anticipated pressure (see 2o AAC 25.035 (e)(2))
Kickoff depth: 8515 MD M~imum hole angle M~imum surface 3191 psig At total depth (TVD) 3786 psig
18. C~ing program Setting Depth
size Specifications Top Bottom Quanti~ of Cement
Hole C~in~ Weight Grade Coupling Length MD TVD MD TVD (include sta~e data)
6.125" 3.5" 9.3¢ L-80 SL-HT 3006' 8350' 5321' 11356' 6121' 556 sx Class G
sidetrack - top of window G 8502'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total Depth: me~ured 10065 feet Plugs (measured)
true vertical 6252 feet ORIGINAL
Effective Depth: me~ured 9957 feet Junk (measured)
true vertical 6195 feet
Casing Length Size Cemented Measured depth True Vedical depth
Conductor 16" 200 sx AS I 123' 123'
SurfaCelntermediate 9.625" 850sx PFE&580sxClassG ~C~~9 3396'
Production 7" 250 sx Class G 10045' 6241'
Perforation depth: me~ured None ~S--~ ¢ ~ 6~ 60BB. 60~S~¢--~
true vertical None
20. Attachmen~ Filing fee ~ Property Plat ~ BOP Sketch ~ Diverter Sketch ~ Drilling program
Drilling fluid program ~ Time vs depth plot ~Refraction analysis ~ Seabed report ~ 20 ~C 25.050 requirements
21. I hereby certi~ that the foregoing is true and correct to the best of my knowledge Questions? Call Bill Lloyd265-653~~
Signed ~ ~ ~~ Title: DrillingEngineeringSupe~isor Date
Chip Alvord pr~D~red
Commission Use Onl~
Permit Number , APlnumber I Approvaldate ISee cover letter
'~ ~ ~/~ I 50- ~ ~ ~'~/~ ~-- ~ / ~ ~ -- ~"~ ~f°r other requirementSyes No
Conditions of approval Samples required ~es
~ ~ ~ Mud Iog r
Hydrogen sulfide me.utes ~ Yes ~ No Directional survey required~Yes ~ No
Required working pressure for BOPE ~2M;~ ~ 3M; ~ 5M; ~ 10M;~ ~
Other:
:,~:~GINAL SIGNED BY by order of
N,
Chdstenson
..... ~.~_~_~_¢ b~__ _ Commissioner the commission Date
Form 10-401 Rev. 12/1/85 ·
Submit in triplicate
I Well Name: I 1 L-26a
Well Plan Summary
Type of Well (producer or injector): I Producer
Surface Location: 566' FNL, 217' FWL, Sec. 32, T11 N-R10E
KOP: 663' FNL, 2061' FEL, Sec. 5, T10N-R10E
Target #1 Start Location: 866' FNL, 1276' FEL, Sec. 5, T10N-R10E
Target #2 Start Location: 1287' FNL, 100' FWL, Sec. 4, T10N-R10E
Bottom Hole Location: 1418' FNL, 455' FWL, Sec. 4, T10N-R10E
J AFE Number: J AKO062 J
Rig: Nabors 16e
Estimated Start Date: I 02/20/oo I I Operating days to complete: 12o.5
KOP
MD:
TD MD:
8515' I '
11356'
KOP
TVD:
TD
TVD:
5409' !
6000' ss
RKB/ 1121'
Surface
Elevation I6'
(a.m.s.I)
Well Design (conventional, slimhole, etc.): I Horizontal Sidetrack Producer
Objective: I Selectively geo-steer well to optimally'drain 2- Kuparuk C sand fault blocks
Formation Markers
..
Formation Tops MD TVD Remarks
Tie-In Survey 8194 5238
KOP 8515 54O9
C30 8776 5556
C20 8997 569O
Base HRZ 9178 5798
K-1 Marker 9348 5886
Top Kuparuk C4 (west) 9510 5934
10600 5953 Projected fault crossing
Top Kuparuk C4 (east) 10957 5999
TD 11356 6121
Casin_Cl/Tubin_q Program
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MDrrVD MD/TVD
6-1/8" 3-1/2" 9.3# L-80 SL-HT 3006' 8350'/5321' 11356'/6121'
tubing 3-1/2" 9.3# L-80 EUE-mod 8350' Surf. 8350'/5321'
General Mud Program
Production Mud Properties: LSND 6-1/8" hole section
Density Viscosity Yield 10 sec 10 min pH APl HTH P
(PPG) Point gel gel Filtrate Filtrate
11.8 45-50 20-24 6-8 8-10 8-9 4-6 10-13
Drilling Fluid System
Triple Derrick Shale Shakers Pit Level Indicator (Visual and Audio Alarm)
Desander, Desilter, Mud Cleaner Trip Tank
Centrifuge Fluid Flow Sensor
Degasser Fluid Aqitators
Drilling fluid practices will be in accordance with the regulations stated in 20 AAC 25.033.
Well Proximity Risks:
There are no close approach issues in this well plan.
Directional
KOP:
Maximum Hole Angle:
Ciose Approach Well:
'Cement
+8515' MD (estimated)
90° ,,
None
First Stage Second Stage
Casing/Liner Sx / Wt / Yield Sx / Wt / Yield: . Comments
3-1/2" Liner 556 / 15.8/1.2 None 150' .liner lap, TOC 200' above TOL, Class
"G" cement, 50% excess in open hole
Lo_q_qin~ Program
LWD Logging:
6-1/8" Hole
Open Hole Logs (eline):
6-1/8" Hole
MWD / GR / Res / Den / Neu Real Time through western fault block,
GR / Res real time through the remainder of the well
None
Cased Hole Logs (eline):
None - CBL on coil
Well Control
Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be
installed and will be capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics for Nabors 16e are on file with AOGCC.
Maximum anticipated surface pressure (MASP) while drilling the production hole is calculated using a KOP
leak-off of 13.5 ppg EMW (0.70 psi/fi) and a gas gradient of 0.11 psi/ft. This shows that formation
breakdown would occur at a surface pressure of 3,191 psi.
MASP = (5409 ft)(0.70 - 0.11)
= 3,191 psi
Based on offset well data, reservoir pressures in the Kuparuk sands in the vicinity of 1L pad are expected
to be -3,491 psi (0.54 psi/ft). Assuming a 150 psi overbalance is required to safely drill and trip in this
formation, then a required mud weight of 11.8 ppg can be predicted as the maximum mud weight needed
to safely drill in this formation, assuming a TVD of 5934'. Target (Kuparuk C)
(3491+150)/(0.052'5934)=11.8.
Hazards
· This well will penetrate ~358' of HRZ at 51° in the 6-1/8"'section. Good drilling Practices, including
optimized flow rates of 240-250 gpm, slower trip and connection' speeds, pumps at 40% when reaming
connections, larger nozzle area for reduced sidewall erosion, all will assure atrouble free interval.
' There is 1 known fault inthe reservoir interval, a'nticipated'to be'~60' throw. Lost circUlation across the '
faults will be controlled with non-productive zone LCM pills..' ., '". . ~ ·
· Lost Circulati°n across the fault, into the reserveir matrix, Or wellbore "breathing" into exposed shales
as a function of excessive ECD (equivalent circulating density)..': ECD .will:be controlled with flow.rate.
and pipe rotation, and monitored with the addition of a PWD (pressure,while-drilling) sub in the BHA.
Disposal ' ' '
Cuttings Should be processed with the Nabors 16e ball mill and transported to DS1R-18 for
injection. . .
Fluid Handling: All drilling and completion fluids and Other Class II waStes to DS1 R-18 for injection. ·
Haul all Class I waste to Pad 3 for disposal. Cement rinseate must be processed through the MI
unit prior to injection in DS1 R-18.
1L-26a Short Well Summary
Pre-Riel Work:
NOTE: If any problems are observed with the 7" packoff during pre-rig operations, notify the Operations
Drilling Engineer, Nabors 16e Company Representative and the wellhead manufacturer. Repairs will be
made prior to initiation of rig work.
1. MIRU wireline and tag PBTD. (Work done 1/14/99- Tagged @ 9916' WLM).
2. Pressure test 10" x 7" casing packoff to 2000 psi (completed 11/17/00). Test 7" casing to 3000 psi for
30 minutes (Completed 1/17/99).
3. Log 7" with USlT bond log (completed 1/18/99). RD wireline. Top of good cement @ 8450' WLM.
4. Make gauge ring/junk basket run to 8550' MD
Ri_q
1.
Work
If unable to get down with gauge ring/junk basket during pre-rig operations, make a dummy mill run to
8600' MD. Otherwise, PU 7" CIBP on wire line, RIH and set @ 8520'..Use USIT log dated 9/9/85 as
tie-in correlation log. Test 7" and bridge plug to 3500 psi.
2. PU Baker Bottom Trip Anchor whipstock and BHA and RIH. Install ditch magnets in troughs. RIH to
~8400' and establish string parameters. Continue in hole to CIBP. and orient'and set base of
whipstock @ 8515'.
Displace well to milling/drilling fluid. Shear whipstock bolt and begin milli'ng window in 7". Mill until 29'
of BHA is in ..the open hole. Circulate well' clean until .no metal is seen in returns. Perform LOT...to a,
minimum of 12.8 pPg. POOH and LD milling assembly.. .,
Ri/,,
PUv-8 BHA and RIH. Displace wellbore to new 11.8 ppg drilling fluid. Perform PWD baseline tests
and drill 6V8" horizontal wellbore to' MD. Use MWD/GR/Res/Den-Neu in western fault in 'real time for
evaluation. Prior to crossing fault, TOOH for bit and to drop Den/Neu tools. .. '
Ri/,,
5. Run _.2 solid liner to TD and cement.
6. Run v_2 L-80'standard Kuparuk gas lift completion. Circulate freeze protection to 2200':: Sting SBE.
into' PBR on top of liner top packer. .
7. Set and test TWCV to 1000 psi. ND BOPE, NU Tree. Pull TWCV and set/test BPV. RDMO.
1L-26 Proposed Plugback
7", 26#, J-55 casing
@ 10,045' MD
face
Cement
9-5/8" 36# J-55 casing set @ 5,225' MD
Packer or Bridge Plug Setting Depth. for Whipstock
tied in with 7" Casing Tally and CBL 1/18/00
Pressure Test 7" csg to 3000 psi and ran CBL on 1/17-18/00
No Perforations
Last Tag at 9,951' MD on 1/14/00
PBTD = 9,957' MD ( Top of Float Collar)
TD = 10,065' MD
BDN 1/20/00
Proposed Completion
3-1/2" 5M FMC Gen IV tubing hanger with 3-1/2" L-80 EUE 8rd Mod pin down.
3-1/2" 9.3# L-80 EUE 8rd Mod Tubing to surface.
3-1/2" Camco 'DS' landing nipple with 2.875" ID No-Go profile set at +/-500' MD.
3-1/2" 9.3# L-80 EUE 8rd Mod Tubing to 'DS' landing nipple w/ 3-1/2" x 1" Camco
'KBMM' mandrels w/DV's, spaced out as follows:
GLM# ME) TVD
2 TBD TBD
3 TBD TBD
4 TBD TBD
5 TBD TBD
6 TBD TBD
Note: Each GLM should have 6' L-80 handling pups installed on top and bottom.
Top of whipstock
@ 8502' Original RKB
@ 8502' Nabors RKB
Window in 7"
7" Baker Bridge Plug
top at
@ 8520' Original RKB
@ 8520' Nabors RKB
No Perfs or Tubing
10.6 ppg Brine in
csg.
7", 26#, J-55
casing @
10,045' MD
Face
Cement
3-1/2" x 1-1/2" Camco 'MMG' Mandrel w/DCR Dump Kill Valve (3000 psi casing to tubing shear). 6" L-80
handling pups installed on top and bottom of mandrel.
1 joint 3-1/2" 9.3# L-80 EUE 8rd Mod Tubing
3-1/2" Camco 'DS' landing nipple with 2.812" ID and No-Go profile
Baker 3-1/2" 'GBH-22' Tubing Seal Assembly ,w/10' of seals and special locater to locate in .liner tie back
sleeve. Locater 5.125"'OD, seals 4.0" OD. 6' L-80 Handling Pup Joint installed.. .. ',' ·
Liner,Top .,' ' ,' ~i.'
Baker 6' Tieback Extension w/5.25" ID. ~' ..
Baker 5" x 7" 'C-2 ZXP' Liner Top Isolation Packer and 6' setting sleeve..
Baker 5" x 7" 'HMC' Hydraulic Liner Hanger.
Baker '80-40' PBR 12' w/4.00" Min ID. SA Box x 3-1/? EUE 8rd Pin: Crossover attached.~
3-1/2" 9.3# L-80 EUE 8rd Mod Tubing from 'D' Nipple to Liner Hanger.
Camco 3-1/2" 'D' Nipple with 2.75" No-Go Profile w/3-1/2" EUE 8rd Box x Pin.
3-1/2" 9.3# L-80 EUE 8rd Mod Tubing from Landing Collar to 'D' Nipple.
3-1/2" EUE 8rd Mod Landing Collar.
1 joint 3-1/2" 9.3# L-80 EUE 8rd Mod Tubing.
3-1/2" EUE 8rd Mod Float Collar.
2 joints 3-1/2" 9.3# L-80 EUE 8rd Mod Tubing.
3-1/2" EUE 8rd Mod Float Shoe.
Future C4
Sand Perfs
Sand Perfs
TD @ +/- 11,356'
BDN 1/20/00
S~rucfure : Pod l[ Well : 26A
F~eld : Kuporuk River Unl~ Looo~on : North Slope, Alosko
1 10.15 AZIMUTH
7314' (TO TD)
4200 4550 4500 4650 4800 4950 5!00 5250 5400 5550 5700 5850 6000 5~50 5~00 5450 55043 6/50 6900 7O50 7200 7580 7500
Verficol Section (feet) ->
Azimuth 1t0~I5 with reference 0.00 N, 0.00 E from slot #26A
ARCO Alaska, Inc.
S~ruc~ure : Pad ~L Welt : 26A
Field : Kuporuk River Uni~ Looofion : Nodh Slope, Alosko
Eas± (feel) ->
2850 5000 5~50 5.300 3450 3600 3750 3900 4050 4200 4550 4500
4650
4800 4950 5~00 5250 5400 5550 5700
[ lARGE7 TOP C4 EAST ] i- ....
~ 563' FNL, 2061' FEL
¢~ ~EC6 TION RIOE
¢~o rARGE~ ~OP C4 WESf:
5100 '~'* %9 SEC 5 rlON RIOE
Easf (feel) ->
~ ~m~c~ For: B. Lloyd
D~te p~otted: 7-Feb-2OOD
Plot ~e~
ARCO Alaska, Inc.
Structure: Pad 1L Well : 26A
Field: Kuparuk River Unit Location: North Slope, Alaska
Point
Tie-In Survey
Top of Whipstock
Bose of Whipstock
Mill Bury Depth
Beg 9/100 Drp/Trn
C50
C20-Mid HRZ
EOC
Base HRZ
Beg 9/100 BId/Trn
K-1
Target/Top C4-West
Begin Right Turn
EOC
To rg et #2/Bo seC 4- West8
Build/Turn 5/100
EOC
Fault/Beg Angle Drp
EOC
Target-Top C4 (East)8
Begin Angle Drop
TD - Csg Pt - EOD
PROFIL
MD
8194.01
8501.71
8514.71
8550.71
8550.73
8776.56
8997.42
9005.94
9177.84
9197.10
9548.19
9510.04
9620.10
9841.10
10345.21
10545.25
10460.65
10600.00
10885.44
10957.22
10957.26
11556.15
Inc
58.20
57.54
58.08
58.90
58.90
55.12
53.15
55.25
55.25
55.25
65.66
79.58
89.48
89.48
89.48
89.48
89.48
89.48
78.14
78.14
78.14
66.18
E COMMENT DATA
Dir
147.20
145.58
145.40
140.70
140.70
114.87
89.93
88.98
88.98
88.98
94.87
100.00
100.00
106.63
106.65
106.65
110.15
110.15
110.15
110.15
110.15
110.15
TVD
5257.71
5401.81
5408.75
5417.12
5417.13
5556.00
5690.00
5695.11
5798.00
5809.52
5886.00
5954.00
5944.47
5946.46
5951 O0
5951 O0
5952 06
5953 33
5983 84
5999 O0
5999 O0
6121.00
North
-5158.70
-5375.47
-5384.41
-5395.17
-5395.18
-5519.41
-5556.85
-5556.79
-5554.33
-5554.05
-5558.84
-5579.04
-5598.04
-5648.90
-5792.60
-5792.61
-5829.64
-5877.64
-5974.54
-5999.41
-5999.45
-6129.97
East
2878.62
3022.69
5029.07
5057.46
5057.47
5195.17
5565.52
5572.55
5510.04
3525.46
5655.26
3808.05
3915.82
4150.74
4611.85
4611.87
4725.25
4854.07
5118.18
5185.97
5186.00
5541.83
V. Sect
4479.50
4689.42
4698.49
4710.07
4710.09
4900.95
5075.75
5080.14
5208.55
5222.95
5546.44
5496.84
5604.55
5825.84
6524.99
6525.05
6442.55
6581.69
6865.02
6955.25
6955.27
7514.28
Deg/lO0!
0.53
0.53
15.24
15.27
9.00
9.00
9.00
9.00,
0.00
0.00
9.00!
9.00
9.00
3.00
0.00
3.00
3.00
0.00
4.00
0.00
3.00
3.00
ARCO Alaska, Inc.
Pad 1L
26A
slot #26A
Kuparuk River Unit
North Slope, Alaska
PROPOSAL LISTING
INCLUDING POSITION UNCERTAINTIES
by
Baker Hughes INTEQ
Your ref : 26A Version#8
Our ref : prop3866
License :
Date printed : 7-Feb-2000
Date created : 2-Feb-2000
Last revised : 7-Feb-2000
Field is centred on n70 16 18.576.w150 5 56.536
Structure is centred on n70 16 17.459,w149 40 33.55
Slot location is n70 16 11.892,w149 40 27.233
Slot Grid coordinates are N 5948404.145, E 540282.660
Slot local coordinates are 566.00 S 217.00 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
ARCO Alaska, Inc.
Pad 1L,26A
Kuparuk River Unit,North Slope, Alaska
Measured Inclin. Azimuth True Vert R E C T A N G U L A R
Depth Degrees Degrees Depth C 0 0 R D I N A T E S
8194.00 58.20 147.20 5237.71 5158.69 S 2878.62 E
8194.01 58.20 147.20 5237.71 5158.70 S 2878.62 E
8200.00 58.18 147.17 5240.87 5162.98 S 2881.38 E
8300.00 57.90 146.64 5293.80 5234.06 S 2927.71 E
8400.00 57.62 146.12 5347.14 5304.49 S 2974.54 E
8500.00 57.35 145.59 5400.89 5374.28 S 3021.88 E
8501.71 57.34 145.58 5401.81 5375.47 S 3022.69 E
8514.71 58.08 143.40 5408.75 5384.41 S 3029.07 E
8530.71 58.90 140.70 5417.12 5395.17 S 3037.46 E
8530.73 58.90 140.70 5417.13 5395.18 S 3037.47 E
8600.00 56.73 133.79 5454.05 5438.21 S 3077.20 E
8700.00 54.32 123.27 5510.76 5489.52 S 3141.47 E
8776.36 53.12 114.87 5556.00 5519.41 S 3195.17 E
8800.00 52.87 112.22 5570.23 5526.95 S 3212.48 E
8900.00 52.48 100.91 5630.99 5549.58 S 3288.48 E
8997.42 53.13 89.93 5690.00 5556.85 S 3365.52 E
9000.00 53.16 89.64 5691.55 5556.85 S 3367.59 E
9005.94 53.23 88.98 5695.11 5556.79 S 3372.35 E
9177.84 53.23 88.98 5798.00 5554.33 S 3510.04 E
9197.10 53.23 88.98 5809.52 5554.05 S 3525.46 E
PROPOSAL LISTING Page 1
Your ref : 26A Version#8
Last revised : 7-Feb-2000
Dogleg Vert
Deg/lOOft Sect
0.00
0.53
0.53
0.53
0.53
0.53
0.53
15.24
15.27
9.00
4479.49
4479.50 Tie-In Survey
4483.56
4551.54
4619.77
4688.25
4689.42 Top of Whipstock
4698.49 Base of Whipstock
4710.07 Mill Bury Depth
4710.09 Begin 9 Deg/lO0' Drop & Turn
9.00 4762.21
9.00 4840.22
9.00 4900.93 C30
9.00 4919.78
9.00 4998.92
9.00 5073.75 C20-Mid HRZ
9.00 5075.69
9.00 5080.14 EOC
0.00 5208.55 Base HRZ
0.00 5222.93 Begin 9 Deg/lO0' Build & Turn
9200.00 53.47 89.11 5811.26 5554.01 S 3527.79 E 9.00 5225.10
9300.00 61.80 93.15 5864.75 5555.81 S 3612.13 E 9.00 5304.91
9348.19 65.86 94.87 5886.00 5558.84 S 3655.26 E 9.00 5346.44 K-1
9400.00 70.23 96.60 5905.37 '5563.65 S 3703.06 E 9.00 5392.98
9500.00 78.73 99.70 5932.11 5577.35 S 3798.34 E 9.00 5487.14
9510.04 79.58 100.00 5934.00 5579.04 S 3808.05 E 9.00 5496.84 Target/Top C4-West
9510.06 79.58 100.00 5934.00 5579.04 S 3808.07 E 9.00 5496.86 Target-West/1L-26A V7
9525.74 80.99 100.00 5936.65 5581.72 S 3823.30 E 9.00 5512.07
9620.10 89.48 100.00 5944.47 5598.04 S 3915.82 E 9.00 5604.55 Begin Right Turn
9700.00 89.48 102.40 5945.19 5613.55 S 3994.18 E 3.00 5683.47
9800.00 89.48 105.40 5946.09 5637.57 S 4091.24 E 3.00 5782.86
9841.10 89.48 106.63 5946.46 5648.90 S 4130.74 E 3.00 5823.84 EOC
10000.00 89.48 106.63 5947.90 5694.38 S 4282.99 E 0.00 5982.44
10343.21 89.48 106.63 5951.00 5792.60 S 4611.83 E 0.00 6324.99 Target#2/Base C4-West
10343.23 89.48 106.63 5951.00 5792.60 S 4611.85 E 0.01 6325.00 Target#2/Base C4-West
10343.25 89.48 106.63 5951.00 5792.61 S 4611.87 E 3.00 6325.03 Build/Turn 3/100
10400.00 89.48 108.33 5951.51 5809.66 S 4665.99 E 3.00 6381.71
10460.65 89.48 110.15 5952.06 5829.64 S 4723.25 E 3.00 6442.35 EOC
10500.00 89.48 110.15 5952.42 5843.19 S 4760.19 E 0.00 6481.70
10600.00 89.48 110.15 5953.33 5877.64 S 4854.07 E 0.00 6581.69 Fault/Begin Angle Drop
10700.00 85.48 110.15 5957.72 5912.04 S 4947.84 E 4.00 6681.58
10800.00 81.48 110.15 5969.08 5946.26 S 5041.09 E 4.00 6780.91
10883.44 78.14 110.15 5983.84 5974.54 S 5118.18 E 4.00 6863.02 EOC
10957.22 78.14 110.15 5999.00 5999.41 S 5185.97 E 0.00 6935.23 Target-Top C4 (East)
10957.24 78.14 110.15 5999.00 5999.42 S 5185.99 E 0.00 6935.25 1L-26A (East) 19-Jan-99
10957.26 78.14 110.15 5999.00 5999.43 S 5186.00 E 3.00 6935.27 Begin Angle Drop
10961.99 78.00 110.15 5999.98 6001.02 S 5190.35 E 3.00 6939.89
11061.99 75.00 110.15 6023.32 6034.51 S 5281.62 E 3.00 7037.12
11161.99 72.00 110.15 6051.72 6067.53 S 5371.63 E 3.00 7132.99
11261.99 69.00 110.15 6085.10 6099.99 S 5460.12 E 3.00 7227.24
All data is in feet unless otherwise stated.
Coordinates from slot #26A and TVD from RKB Nabors 16E (121.00 Ft above mean sea level).
Bottom hole distance is 8263.69 on azimuth 137.88 degrees from wellhead.
Total Dogleg for wellpath is 120.34 degrees.
Vertical section is from N 0.00 E 0.00 on azimuth 110.15 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1L,26A
Kuparuk River Unit. North Slope. Alaska
Measured Inclin. Azimuth True Vert R E C T A N G U L A R
Depth Degrees Degrees Depth C 0 0 R D I N A T E S
11356.16 66.17 110.15 6121.00 6129.98 S 5541.84 E
PROPOSAL LISTING Page 2
Your ref : 26A Version
Last revised : 7-Feb-2000
Dogleg Vert
Deg/lOOft Sect
3.00 7314.29 TD - Csg Pt - EOD
All data is in feet unless otherwise stated.
Coordinates from slot#26A and TVD from RKB Nabors 16E (121.00 Ft above mean sea level).
Bottom hole distance is 8263.69 on azimuth 137.88 degrees from wellhead.
Total Dogleg for wellpath is 120.34 degrees.
Vertical section is from N 0.00 E 0.00 on azimuth 110.15 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad IL, 26A
Kuparuk River Unit. North Slope, Alaska
PROPOSAL LISTING Page 3
Your ref : 26A Version#8
Last revised : 7-Feb-2000
Comments in wel 1 path
MD TVD Rectangul ar Coords. Comment
8194.01 5237.71 5158.70 S 2878 62 E Tie-In Survey
8501.71
8514.71
8530.71
8530.73
8776.36
8997.42
9005 94
9177 84
9197 10
9348 19
9510 04
9510 06
9620 10
9841 10
10343 21
10343 23
10343 25
10460 65
10600 O0
10883 44
10957 22
10957 24
10957 26
11356 16
5401.81 5375.47 S 3022
5408.75 5384.41 S 3029
5417.12 5395.17 S 3037
5417.13 5395.18 S 3037
5556.00 5519.41S 3195
5690.00 5556.85 S 3365
5695.11 5556.79 S 3372
5798.00 5554.33 S 3510
5809.52 5554.05 S 3525
5886.00 5558.84 S 3655
5934.00 5579.04 S 3808
5934.00 5579.04 S 3808
5944.47 5598.04 S 3915
5946.46 5648.90 S 4130
5951.00 5792.60 S 4611
5951.00 5792.60 S 4611
5951.00 5792.61S 4611
5952.06 5829.64 S 4723
5953.33 5877.64 S 4854
5983.84 5974.54 S 5118
5999.00 5999.41S 5185
5999.00 5999.42 S 5185
5999.00 5999.43 S 5186
6121.00 6129.98 S 5541
69 E Top of Whipstock
07 E Base of Whipstock
46 E Mill Bury Depth
47 E Begin 9 Deg/lO0' Drop & Turn
17 E C30
52 E C20-Mid HRZ
35 E EOC
04 E Base HRZ
46 E Begin 9 Deg/lO0' Build & Turn
26 E K-1
05 E Target/Top C4-West
.07 E Target-West/1L-26A V7
.82 E Begin Right Turn
.74 E EOC
.83 E Target#2/Base C4-West
.85 E Target#2/Base C4-West
.87 E Build/Turn 3/100
.25 E EOC
.07 E Fault/Begin Angle Drop
.18 EEOC
.97 E Target-Top C4 (East)
.99 E 1L-26A (East) 19-Jan-99
.00 E Begin Angle Drop
.84 ETD - Csg Pt - EOD
Casing positions in string 'A'
Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing
n/a 5237.71 5158.69S 2878.62E 11356.20 6121.00 6129.98S 5541.84E 3-1/2" Liner
Targets associated with this wellpath
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
Target-West/1L-26A V 544120.000,5942846.000,0.0000 5934.00 5579.04S 3808.07E 2-Feb-2000
Target#2/Base C4-Wes 544924.820,5942636.740,0.0000 5951.00 5792.60S 4611.85E 4-Feb-2000
1L-26A (East) 19-Jan 545500.000,5942433.000,0.0000 5999.00 5999.42S 5185.99E 19-Jan-2000
ARCO Alaska, Inc.
Pad 1L,26A
Kuparuk River Unit. North Slope, Alaska
PROPOSAL LISTING Page 1
Your ref : 26A Version#8
Last revised : 7-Feb-2000
Measured Inclin. Azimuth True Vert R E C T A N G U L A R Vert Ellipse Semi Axes Minor
Depth Degrees Degrees Depth C 0 0 R D I N A T E S Sect Major Minor Vert. Azi.
8194.00 58.20 147.20 5237.71 5158.69 S 2878.62 E 4479.49 293.60 41.07 53.03 330.38
8194.01 58.20 147.20 5237.71 5158.70 S 2878.62 E 4479.50 293.60 41.07 53.03 330.38
8200.00 58.18 147.17 5240.87 5162.98 S 2881.38 E 4483.56 293.87 41.10 53.07 330.38
8300.00 57.90 146.64 5293.80 5234.06 S 2927.71E 4551.54 298.39 41.61 53.86 330.32
8400.00 57.62 146.12 5347.14 5304.49 S 2974.54 E 4619.77 302.92 42.12 54.64 330.26
8500.00 57.35 145.59 5400.89 5374.28 S 3021.88 E 4688.25 307.46 42.63 55.42 330.19
8501.71 57.34 145.58 5401.81 5375.47 S 3022.69 E 4689.42 307.54 42.64 55.44 330.19
8514.71 58.08 143.40 5408.75 5384.41 S 3029.07 E 4698.49 308.15 42.70 55.54 330.18
8530.71 58.90 140.70 5417.12 5395.17 S 3037.46 E 4710.07 308.94 42.78 55.67 330.15
8530.73 58.90 140.70 5417.13 5395.18 S 3037.47 E 4710.09 308.94 42.78 55.67 330.15
8600.00 56.73 133.79 5454.05 5438.21 S 3077.20 E 4762.21 312.38 43.13 56.20 329.96
8700.00 54.32 123.27 5510.76 5489.52 S 3141.47 E 4840.22 317.23 43.65 56.93 329.52
8776.36 53.12 114.87 5556.00 5519.41S 3195.17 E 4900.93 320.65 44.04 57.47 329.05
8800.00 52.87 112.22 5570.23 5526.95 S 3212.48 E 4919.78 321.71 44.16 57.63 328.91
8900.00 52.48 100.91 5630.99 5549.58 S 3288.48 E 4998.92 325.62 44.68 58.33 328.15
8997.42 53.13 89.93 5690.00 5556.85 S 3365.52 E 5073.75 328.69 45.19 59.02 327.28
9000.00 53.16 89.64 5691.55 5556.85 S 3367.59 E 5075.69 328.78 45.20 59.04 327.25
9005.94 53.23 88.98 5695.11 5556.79 S 3372.35 E 5080.14 328.96 45.24 59.08 327.20
9177.84 53.23 88.98 5798.00 5554.33 S 3510.04 E 5208.55 334.51 46.28 60.30 325.69
9197.10 53.23 88.98 5809.52 5554.05 S 3525.46 E 5222.93 335.13 46.40 60.43 325.52
9200.00 53.47 89.11 5811.26 5554.01 S 3527.79 E 5225.10 335.23 46.42 60.45 325.50
9300.00 61.80 93.15 5864.75 5555.81S 3612.13 E 5304.91 339.56 47.17 61.30 324.54
9348.19 65.86 94.87 5886.00 5558.84 S 3655.26 E 5346.44 342.12 47.57 61.76 324.06
9400.00 70.23 96.60 5905.37 5563.65 S 3703.06 E 5392.98 344.87 47.99 62.25 323.55
9500.00 78.73 99.70 5932.11 5577.35 S 3798.34 E 5487.14 350.97 48.83 63.29 322.57
9510.04 79.58 100.00 5934.00 5579.04 S 3808.05 E 5496.84 351.59 48.91 63.40 322.48
9510.06 79.58 100.00 5934.00 5579.04 S 3808.07 E 5496.86 351.59 48.91 63.40 322.48
9525.74 80.99 100.00 5936.65 5581.72 S 3823.30 E 5512.07 352.58 49.05 63.56 322.33
9620.10 89.48 100.00 5944.47 5598.04 S 3915.82 E 5604.55 358.69 49.80 64.59 321.41
9700.00 89.48 102.40 5945.19 5613.55 S 3994.18 E 5683.47 364.09 50.43 65.45 320.70
9800.00 89.48 105.40 5946.09 5637.57 S 4091.24 E 5782.86 371.15 51.17 66.54 319.90
9841.10 89.48 106.63 5946.46 5648.90 S 4130.74 E 5823.84 374.10 51.47 66.99 319.59
10000.00 89.48 106.63 5947.90 5694.38 S 4282.99 E 5982.44 385.64 52.62 68.71 318.43
10343.21 89.48 106.63 5951.00 5792.60 S 4611.83 E 6324.99 411.18 55.10 72.44 316.14
10343.23 89.48 106.63 5951.00 5792.60 S 4611.85 E 6325.00 411.18 55.10 72.44 316.14
10343.25 89.48 106.63 5951.00 5792.61 S 4611.87 E 6325.03 411.18 55.10 72.44 316.14
10400.00 89.48 108.33 5951.51 5809.66 S 4665.99 E 6381.71 415.51 55.47 73.06 315.81
10460.65 89.48 110.15 5952.06 5829.64 S 4723.25 E 6442.35 420.20 55.84 73.72 315.49
10500.00 89.48 110.15 5952.42 5843.19 S 4760.19 E 6481.70 423.25 56.08 74.15 315.28
10600.00 89.48 110.15 5953.33 5877.64 S 4854.07 E 6581.69 431.03 56.68 75.23 314.77
10700.00 85.48 110.15 5957.72 5912.04 S 4947.84 E 6681.58 438.81 57.30 76.31 314.28
10800.00 81.48 110.15 5969.08 5946.26 S 5041.09 E 6780.91 446.52 57.95 77.37 313.81
10883.44 78.14 110.15 5983.84 5974.54 S 5118.18 E 6863.02 452.87 58.50 78.24 313.44
10957.22 78.14 110.15 5999.00 5999.41 S 5185.97 E 6935.23 458.50 58.98 79.00 313.12
10957.24 78.14 110.15 5999.00 5999.42 S 5185.99 E 6935.25 458.51 58.98 79.00 313.12
10957.26 78.14 110.15 5999.00 5999.43 S 5186.00 E 6935.27 458.51 58.98 79.00 313.12
10961.99 78.00 110.15 5999.98 6001.02 S 5190.35 E 6939.89 458.87 59.01 79.05 313.10
11061.99 75.00 110.15 6023.32 6034.51S 5281.62 E 7037.12 466.36 59.67 80.06 312.69
11161.99 72.00 110.15 6051.72 6067.53 S 5371.63 E 7132.99 473.68 60.31 81.04 312.30
11261.99 69.00 110.15 6085.10 6099.99 S 5460.12 E 7227.24 480.79 60.96 81.99 311.94
All data is in feet unless otherwise stated.
Coordinates from slot #26A and TVD from RKB Nabors 16E (121.00 Ft above mean sea level).
Bottom hole distance is 8263.69 on azimuth 137.88 degrees from wellhead.
Vertical section is from N 0.00 E 0.00 on azimuth 110.15 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1L,26A
Kuparuk River Unit,North Slope, Alaska
Measured Inclin. Azimuth True Vert
Depth Degrees Degrees Depth
RECTANGULAR
COORDINATES
11356.15 66.18 110.15 6121.00 6129.97 S 5541.83 E
11356.16 66.17 110.15 6121.00 6129.98 S 5541.84 E
PROPOSAL LISTING Page 2
Your ref : 26A Version#8
Last revised : 7-Feb-2000
Vert Ellipse Semi Axes Minor
Sect Major Minor Vert. Azi.
7314.28 487.27 61.55 82.85 311.62
7314.29 487.27 61.55 82.85 311.62
POSITION UNCERTAINTY SUMMARY
Depth Position Uncertainty
From To Survey Tool Error Model Major Minor Vert.
0 8194 ARCO (H.A. Mag) User specified 293.60 41.07 53.03
8194 11356 ARCO (H.A. Mag) User specified 487.27 61.55 82.85
1. Ellipse dimensions are half axis.
2. Casing dimensions are not included.
3. Ellipses are calculated on 2.58 standard deviations.
4. Uncertainty calculations start at drill depth zero.
5. Surface position uncertainty is not included.
6. Where two surveys are tied together the errors of one are considered
to have a systematic relationship to the corresponding errors of the other.
7. Detailed description of the INTEQ error models can be found
in the Ec*Trak manual.
All data is in feet unless otherwise stated.
Coordinates from slot #26A and TVD from RKB Nabors 16E (121.00 Ft above mean sea level).
Bottom hole distance is 8263.69 on azimuth 137.88 degrees from wellhead.
Vertical section is from N 0.00 E 0.00 on azimuth 110.15 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ARCO Alaska, Inc.
Pad 1L,26A
Kuparuk River Unit. North Slope. Alaska
PROPOSAL LISTING Page 3
Your ref : 26A Version#8
Last revised : 7-Feb-2000
Comments in wellpath
MD TVD Rectangular Coords. Comment
8194.01 5237.71 5158.70 S 2878.62 E Tie-In Survey
8501.71 5401.81 5375.47 S 3022.69 E Top of Whipstock
8514.71 5408.75 5384.41S 3029.07 E Base of Whipstock
8530.71 5417.12 5395.17 S 3037.46 E Mill Bury Depth
8530.73 5417.13 5395.18 S 3037.47 E Beg 9/100 Drp/Trn
8776.36 5556.00 5519.41S 3195.17 E C30
8997.42 5690.00 5556.85 S 3365.52 E C20-Mid HRZ
9005.94 5695.11 5556.79 S 3372.35 EEOC
9177.84 5798.00 5554.33 S 3510.04 E Base HRZ
9197.10 5809.52 5554.05 S 3525.46 E Beg 9/100 Bld/Trn
9348.19 5886.00 5558.84 S 3655.26 E K-1
9510.04 5934.00 5579.04 S 3808.05 E Target/Top C4-West
9510.06 5934.00 5579.04 S 3808.07 E Target-West/1L-26A V7
9620.10 5944.47 5598.04 S 3915.82 E Begin Right Turn
9841.10 5946.46 5648.90 S 4130.74 E EOC
10343.21 5951.00 5792.60 S 4611.83 E Target#2/BaseC4-West
10343.23 5951.00 5792.60 S 4611.85 E Target~2/Base C4-West
10343.25 5951.00 5792.61S 4611.87 E Build/Turn 3/100
10460.65 5952.06 5829.64 S 4723.25 E EOC
10600.00 5953.33 5877.64 S 4854.07 E Fault/Beg Angle Drp
10883.44 5983.84 5974.54 S 5118.18 EEOC
10957.22 5999.00 5999.41S 5185.97 E Target-Top C4 (East)
10957.24 5999.00 5999.42 S 5185.99 E 1L-26A (East) 19-Jan-99
10957.26 5999.00 5999.43 S 5186.00 E Begin Angle Drop
11356.15 6121.00 6129.97 S 5541.83 ETD - Csg Pt - EOD
Casing positions in string 'A'
Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing
n/a 5237.71 5158.69S 2878.62E 8501.00 5401.43 5374.98S 3022.35E 7" Window
n/a 5237.71 5158.69S 2878.62E 11356.20 6121.00 6129.98S 5541.84E 3-1/2" Liner
Targets associated with this wel 1 path
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
Target#2/Base C4-Wes 544924.820,5942636.740,0.0000 5951.00 5792.60S 4611.85E 4-Feb-2000
1L-26A (East)19-Jan 545500.000,5942433.000,0.0000 5999.00 5999.42S 5185.99E 19-Jan-2000
ARCO Alaska, Inc.
Pad 1L,26A
Kuparuk River Unit,North Slope, Alaska
PROPOSAL LISTING Page 1
Your ref : 26A VersionS8
Last revised : 7-Feb-2000
Measured Inclin Azimuth True Vert R E C TAN G U L A R Dogleg Vert G R I D C 0 0 R D S
Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOft Sect Easting Northing
8194.00 58.20 147.20 5237.71 5158.69S 2878.62E 0.00 4479.49 543188.41 5943261.36
8194.01 58.20 147.20 5237.71 5158.70S 2878.62E 0.53 4479.50 543188.42 5943261.35
8200.00 58.18 147.17 5240.87 5162.98S 2881.38E 0.53 4483.56 543191.20 5943257.09
8300.00 57.90 146.64 5293.80 5234.06S 2927.71E 0.53 4551.54 543237.90 5943186.26
8400.00 57.62 146.12 5347.14 5304.49S 2974.54E 0.53 4619.77 543285.10 5943116.08
8500.00 57.35 145.59 5400.89 5374.28S 3021.88E 0.53 4688.25 543332.80 5943046.55
8501.71 57.34 145.58 5401.81 5375.47S 3022.69E 0.53 4689.42 543333.62 5943045.37
8514.71 58.08 143.40 5408.75 5384.41S 3029.07E 15.24 4698.49 543340.05 5943036.46
8530.71 58.90 140.70 5417.12 5395.17S 3037.46E 15.27 4710.07 543348.50 5943025.75
8530.73 58.90 140.70 5417.13 5395.18S 3037.47E 9.00 4710.09 543348.51 5943025.74
8600.00 56.73 133.79 5454.05 5438.21S 3077.20E 9.00 4762.21 543388.46 5942982.92
8700.00 54.32 123.27 5510.76 5489.52S 3141.47E 9.00 4840.22 543453.00 5942931.96
8776.36 53.12 114.87 5556.00 5519.41S 3195.17E 9.00 4900.93 543506.85 5942902.36
8800.00 52.87 112.22 5570.23 5526.95S 3212.48E 9.00 4919.78 543524.20 5942894.91
8900.00 52.48 100.91 5630.99 5549.58S 3288.48E 9.00 4998.92 543600.31 5942872.69
8997.42 53.13 89.93 5690.00 5556.85S 3365.52E 9.00 5073.75 543677.38 5942865.83
9000.00 53.16 89.64 5691.55 5556.85S 3367.59E 9.00 5075.69 543679.45 5942865.85
9005.94 53.23 88.98 5695.11 5556.79S 3372.35E 9.00 5080.14 543684.21 5942865.93
9177.84 53.23 88.98 5798.00 5554.33S 3510.04E 0.00 5208.55 543821.86 5942869.12
9197.10 53.23 88.98 5809.52 5554.05S 3525.46E 0.00 5222.93 543837.28 5942869.48
9200.00 53.47 89.11 5811.26 5554.01S 3527.79E 9.00 5225.10 543839.61 5942869.53
9300.00 61.80 93.15 5864.75 5555.81S 3612.13E 9.00 5304.91 543923.96 5942868.19
9348.19 65.86 94.87 5886.00 5558.84S 3655.26E 9.00 5346.44 543967.10 5942865.38
9400.00 70.23 96.60 5905.37 5563.65S 3703.06E 9.00 5392.98 544014.92 5942860.83
9500.00 78.73 99.70 5932.11 5577.35S 3798.34E 9.00 5487.14 544110.26 5942847.64
9510.04 79.58 100.00 5934.00 5579.04S 3808.05E 9.00 5496.84 544119.98 5942846.00
9510.06 79.58 100.00 5934.00 5579.04S 3808.07E 9.00 5496.86 544120.00 5942846.00
9525.74 80.99 100.00 5936.65 5581.72S 3823.30E 9.00 5512.07 544135.24 5942843.40
9620.10 89.48 100.00 5944.47 5598.04S 3915.82E 9.00 5604.55 544227.83 5942827.58
9700.00 89.48 102.40 5945.19 5613.55S 3994.18E 3.00 5683.47 544306.27 5942812.48
9800.00 89.48 105.40 5946.09 5637.57S 4091.24E 3.00 5782.86 544403.45 5942788.99
9841.10 89.48 106.63 5946.46 5648.90S 4130.74E 3.00 5823.84 544443.00 5942777.86
10000.00 89.48 106.63 5947.90 5694.38S 4282.99E 0.00 5982.44 544595.48 5942733.20
10343.21 89.48 106.63 5951.00 5792.60S 4611.83E 0.00 6324.99 544924.81 5942636.74
10343.23 89.48 106.63 5951.00 5792.60S 4611.85E 0.01 6325.00 544924.82 5942636.74
10343.25 89.48 106.63 5951.00 5792.61S 4611.87E 3.00 6325.03 544924.84 5942636.73
10400.00 89.48 108.33 5951.51 5809.66S 4665.99E 3.00 6381.71 544979.05 5942619.98
10460.65 89.48 110.15 5952.06 5829.64S 4723.25E 3.00 6442.35 545036.41 5942600.30
10500.00 89.48 110.15 5952.42 5843.19S 4760.19E 0.00 6481.70 545073.42 5942586.95
10600.00 89.48 110.15 5953.33 5877.64S 4854.07E 0.00 6581.69 545167.47 5942553.00
10700.00 85.48 110.15 5957.72 5912.04S 4947.84E 4.00 6681.58 545261.41 5942519.10
10800.00 81.48 110.15 5969.08 5946.26S 5041.09E 4.00 6780.91 545354.84 5942485.38
10883.44 78.14 110.15 5983.84 5974.54S 5118.18E 4.00 6863.02 545432.07 5942457.51
10957.22 78.14 110.15 5999.00 5999.41S 5185.97E 0.00 6935.23 545499.98 5942433.01
10957.24 78.14 110.15 5999.00 5999.42S 5185.99E 0.00 6935.25 545500.00 5942433.00
10957.26 78.14 110.15 5999.00 5999.43S 5186.00E 3.00 6935.27 545500.02 5942432.99
10961.99 78.00 110.15 5999.98 6001.02S 5190.35E 3.00 6939.89 545504.37 5942431.42
11061.99 75.00 110.15 6023.32 6034.51S 5281.62E 3.00 7037.12 545595.81 5942398.43
11161.99 72.00 110.15 6051.72 6067.53S 5371.63E 3.00 7132.99 545685.98 5942365.89
11261.99 69.00 110.15 6085.10 6099.99S 5460.12E 3.00 7227.24 545774.63 5942333.90
All data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from slot #26A and TVD from RKB Nabors 16E (121.00 Ft above mean sea level).
Bottom hole distance is 8263.69 on azimuth 137.88 degrees from wellhead.
Total Dogleg for wellpath is 120.34 degrees.
Vertical section is from N 0.00 E 0.00 on azimuth 110.15 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hughes INTEQ t~"
ARCO Alaska, Inc.
Pad 1L.26A
Kuparuk River Unit,North Slope, Alaska
Measured Inclin Azimuth True Vert R E C TAN G U L A R
Depth Degrees Degrees Depth C 0 0 R D I N A T E S
PROPOSAL LISTING Page 2
Your ref : 26A Version#8
Last revised : 7-Feb-2000
Dogleg Vert G R I D C 0 0 R D S
Deg/lOOft Sect Easting Northing
11356.15 66.18 110.15 6121.00 6129.97S 5541.83E 3.00 7314.28 545856.49 5942304.36
11356.16 66.17 110.15 6121.00 6129.98S 5541.84E 3.00 7314.29 545856.50 5942304.35
All data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from slot #26A and TVD from RKB Nabors 16E (121.00 Ft above mean sea level).
Bottom hole distance is 8263.69 on azimuth 137.88 degrees from wellhead.
Total Dogleg for wellpath is 120.34 degrees.
Vertical section is from N 0.00 E 0.00 on azimuth 110.15 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hughes INTEQ ~I
ARCO Alaska. Inc.
Pad 1L.26A
Kuparuk River Unit,North Slope, Alaska
PROPOSAL LISTING Page 3
Your ref : 26A Version#8
Last revised : 7-Feb-2000
Comments in wellpath
MD TVD Rectangular Coords. Comment
8194.01 5237.71 5158.70S 2878.62E Tie-In Survey
8501.71 5401.81 5375.47S 3022.69E Top of Whipstock
8514.71 5408.75
8530.71 5417.12
8530.73 5417.13
8776.36 5556.00
8997,42 5690.00
9005.94 5695.11
9177.84 5798.00
9197.10 5809.52
9348.19 5886.00
9510.04 5934.00
9510.06 5934.00
9620.10 5944.47
9841,10 5946.46
10343,21 5951.00
10343.23 5951.00
10343.25 5951.00
10460.65 5952.06
10600,00 5953.33
10883.44 5983.84
10957.22 5999.00
10957.24 5999,00
10957.26 5999,00
11356.15 6121.00
5384.41S
5395.17S
5395.18S
5519.41S
5556.85S
5556 79S
5554 33S
5554 05S
5558 84S
5579 04S
5579 04S
5598 04S
5648 90S
5792 60S
5792 60S
5792 61S
5829 64S
5877 64S
5974 54S
5999 41S
5999 42S
5999 43S
6129 97S
3029.07E Base of Whipstock
3037.46E Mill Bury Depth
3037.47E Beg 9/100 Drp/Trn
3195.17E C30
3365.52E C20-Mid HRZ
3372.35E EOC
3510.04E Base HRZ
3525.46E Beg 9/100 Bld/Trn
3655.26E K-1
3808.05E Target/Top C4-West
3808.07E Target-West/1L-26A V7
3915.82E Begin Right Turn
4130.74E EOC
4611,83E Target#2/BaseC4-West
4611.85E Target#2/Base C4-West
4611.87E Build/Turn 3/100
4723.25E EOC
4854.07E Fault/Beg Angle Drp
5118,18E EOC
5185.97E Target-Top C4 (East)
5185,99E 1L-26A (East) 19-Jan-99
5186.00E Begin Angle Drop
5541.83E TD - Csg Pt - EOD
Casing positions in string 'A'
Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing
.... ..... ..... ..... ..... .........
n/a 5237.71 5158.69S 2878,62E 11356.20 6121,00 6129.98S 5541.84E 3-1/2" Liner
Targets associated with this wellpath
Target name Geographic Locati on T.V.D. Rectangul ar Coordi nates Revised
...... ..... .......
Target#2/Base C4-Wes 544924.820,5942636.740,0.0000 5951.00 5792.60S 4611.85E 4-Feb-2000
1L-26A (East)19-Jan 545500.000,5942433.000,0,0000 5999.00 5999.42S 5185,99E 19-Jan-2000
ARCO Alaska, Inc.
Pad 1L
26A
slot #26A
Kuparuk River Unit
North Slope, Alaska
SUMMARY
CLEARANCE
by
Baker Hughes INTEQ
REPORT
Your ref : 26A Version#8
Our ref : prop3866
License :
Date printed : 7-Feb-2000
Date created : 2-Feb-2000
Last revised : 7-Feb-2000
Field is centred on n70 16 18.576,w150 5 56.536
Structure is centred on n70 16 17.459,w149 40 33.55
Slot location is n70 16 11.892,w149 40 27.233
Slot Grid coordinates are N 5948404.145, E 540282.660
Slot local coordinates are 566.00 S 217.00 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
Object wel 1 path
PGMS <0-9353'>,,25,
PGMS <0-7478'>,,1,
PGMS <0-10125'>,,9,
PGMS <0-7810'>,,8,
PGMS <0-9100'>,,10,
PGMS <0-6700'> ,7,
PGMS <0-7668'> ,4,
PGMS <0-8839'>, 19,
PGMS <0-7830'>, 16,
PGMS <0-6704'>, 15,
PGMS <0-8103'>, 12,
PGMS <0-9369'>,
PGMS <0-8470'>
PGMS <0-7795'>
PGMS <0-6721'>
PGMS <0-7800'>,
PGMS <0-6469'>,
PGMS <0-12550'>
PGMS <0-10176'>
PGMS <0-7950'>,
PGMS <0-8700'>,
PGMS <0-9241'>,
PGMS <0-10345'>
Pad 1L
Pad 1L
Pad 1L
Pad 1L
Pad 1L
Pad 1L
Pad 1L
Pad 1L
Pad 1L
Pad 1L
Pad 1L
11,Pad 1L
,6,Pad 1L
,5,Pad 1L
,2,Pad 1L
18,Pad 1L
14,Pad 1L
,21,Pad 1L
,22,Pad 1L
13,Pad 1L
17,Pad 1L
24,Pad 1L
,23,Pad 1L
PGMS <0-8475'> ,3,Pad 1L
PMSS <0-4285'>,,3PB1,Pad 1L
PMSS <6116 - 7571'>,,3A,Pad 1L
PMSS <O-11770'>,,28,Pad 1L
Closest approach with 3-D Minimum Distance method
Last revised Distance M.D. Diverging from M.D.
28-0ct-1998
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
9-May-1991
1-Ju1-1991
1-Ju1-1991
20-Jun-1991
9-May-1991
18-Feb-1999
18-Feb-1999
18-Feb-1999
18-Feb-1999
6-Apr-1999
6-Apr-1999
14-Ju1-1999
30-Dec-1999
2026.3
7678.5
7429.5
6596.8
6618.0
7052 8
7896 8
2224 9
7056 3
6147 1
4553 1
4832 5
7659 1
7696 1
6987 7
2623 0
5260 0
5213 2
2555 9
4939 4
6390 3
4119 4
5778 8
8057 0
8057 0
8057 0
7355 9
8194.0 8194
8194.0 8194
8194.0 10935
8194.0 8194
8194.0 8194
8194.0 8194
8194.0 8194
9766.7 9766
8194.0 8194
8194.0 8194
8194.0 9286
8194.0 9722
8194.0 8194
8194.0 8194
8194.0 9141
8194.0 8194
8194.0 8194
8194.0 9810
11356.2 11356
8194.0 8194
8194.0 8194
8194.0 8194
8194.0 8194
8194.0 8194
8194.0 8194
8194.0 8194
8194.0 8194
PGMS <0-12532'>,,20~. .d 1L
PMSS <0-11500'>,,20,?ad 1L
PMSS Depth Shifted <O-11711'>,,20,Pad 1L
PMSS <0-10065'>,,26,Pad 1L
22-0ct-1999
12-May-1991
9-Jan-2000
27-$an-2000
6622.9
6546.2
6546.2
0.0
819~
8194.0
8194.0
8501.7
8194.0
10326.0
10326.0
8501.7
Robert Christenson i {'
Application for Permit to Drill - 1L-26a
Page 2
9)
Due to the large volume of regional information available, ARCO
considers this well to be a development well, and as such, no
mudlogging operations such as type log generation and sample
catching are planned. The following are ARCO's designated contacts
for reporting responsibilities to the Commission:
1)
2)
Completion Report
Technologist
(20 AAC 25.070)
Geologic Data and Logs
(20 AAC 25.071)
Sharon AIIsup-Drake, Drilling
263-4612
Meg Kremer, Geologist
265-6460
The anticipated spud date for this well is February 20, 2000. If you have any
questions or require further information, please contact Bill Lloyd at (907)265-
6531 or Chip Alvord at (907) 265-6120.
~'Willia,m B. LloyX~ ~
Senior Drilling Engineer
CC:
Kuparuk 1L-26a Well File
Chip Alvord ATO-1030
.]eft Corwith ATO- 1284
ARCO Alaska, Inc. i'
Post Office Box 100360
Anchorage, Alaska 99510-0360
February 7, 2000
Robert Christenson, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501-3192
Re:
Application for Permit to Drill: KRU 1L-26a
Surface Location: 566' FNL 217' FWL Sec 32 TllN RIOE, UM
Target Location: 1287' FNL, 100' FWL Sec. 4, TION, RIOE, UM
Bottom Hole Location: 1418' FNL, 455' FWL Sec. 4, TION, RIOE, UN!
Dear Commissioner Christenson,
ARCO Alaska, Inc. hereby applies, for a Permit to Drill an onshore development
well to the Kuparuk interval from ,~ad in the Kuparuk River Unit ("KRU"). The
well is designed to penetrate and further develop the production potential of the
Kuparuk sands in the vicinity of 1L pad.
The well is designated as a horizontal sidetracked production well, exiting from the
existing 7" intermediate casing of the 1L-26 well. A 3-1/2" production liner will be
run and cemented and the well will be completed with 3-:1/2" tubing.
Please find attached information as required by 20 AAC 25.005 (a) and (c) for
your review. Pertinent information attached to this application includes the
following:
:1)
2)
3)
4)
5)
6)
7)
8)
Form 10-401 Application for Permit to Drill per 20 AAC 25.005 (a).
Fee of $100 payable to the State of Alaska per 20 AAC 25.005 (c) (:1).
A directional plat showing the surface and bottomhole locations proposed
for the well per 20 AAC 25.005 (c) (2).
Directional plots and proximity calculations in accordance with the
requirements of 20 AAC 25.050.
A complete proposed casing and cementing program is attached as
per 20 AAC 25.030. A wellbore schematic is also attached visually
depicting the proposed well and completion design.
The drilling fluid program, in addition to the requirements set forth in
20 AAC 25.033 are attached in this APD package.
A copy of the proposed drilling program.
ARCO does not anticipate the presence of H2S in the formations to be
encountered in this well. However, H2S monitoring equipment will be
functioning on the rigs as is the standard operating procedure in the
Kuparuk River Unit drilling operation.
i..:':?: .: -:-'.::::::-::::::::::::::::::::::::::::::: .... --.:::.: ::--:'"'---:-:::::..::...-::::::-:.::::;":-:::-..-:.:.:::i:-.;:::.3. ,, :::::::::::::::::::::::::::::: ..:::::::':':"-:::::....._:.-:.:i-:::::::'<.-::::':'.::::.:::.:.:-... :';. :-'.. :.:=:=:= ::::: = ===
i.:.:'?-ARCO ::Alas ka,:.:ln0:::-:-::.~ ::::: :::,. -:::::.:...-:-::: :...::: ::-.: :~::-. :?.:::-~--:-:::'.::: i.-::..:'- :: i.:..: .:: .-.:.. ~ ~ ,- ~ ^ ~ ~ ~ o : ~-~ ~ ~
{:..: :. KUparuk.::.ijn'il:::Dj:SbO~:se.ment 'AccoUnt '::-'.. :':'::: :" ..:.... cHEcK-.:NOMBER':.. ~-.~1~U ! J~.~-. / / 0
! :::- :. :::.::... : . -.~.: -:::: -...--. :... : : -.:. . .. :::. ..: : -.._. ..-.....:-:: .. -. ~.
~. -'= P:O. Box::::.<:.1027:.6-::---:.-::..:-: .... :'...-':'-:.:.:-.:' '-.'.:-. :--'-:'--:~..:... '-' -'-..::'- :.:-. =-. :'.. .-- ::- ' .
'" Ah~'~age,.::AK:::::995.:10:~2776 '::.':-. :':-::.::::"-i-'i=- '-:-::::::::.-. ====================== ::..:' ::':';::: :'::-- :::'-.. ::: '..::.:=! .- ..
- :::::::::::::::::::::::: ::::::::::::::::::::::::-' =============================== ::::-::.:-: .:.:.:: :::. ::.?.. .-.? = i- ---- '--:-.:.:::--.::...::..::..-?..i: ' :- ?:-.:---.;.:::-:. :.?.? :.: -:'.- :i::1%._-:.::: -" :.::: .=== =::FEBRUAFI¥ 8, :2000
PAY
============================ :::::::::::::::::::::: ================================= '.'--::: :::::::'"'? :.-:-'"':' ::.." ::-
':.. .... .: ....' ': :;.......:.::.:" ..:: .: .~XA~£~:.:.~*****~.*~'~.OO mL~S ~D O0 'CENTS $*********** 100.00
The First National Bank Of Chicago-O?lO
Chicago, .Illinois
i: .:-:: !!' 'i?:=::::i:: i=:~ayable Th.r:~'~::'::Repub:l:~::='Bank .: :::.ii:::'i:::::=:::iii! !:.::-.. :::::::::::::::::::::::::: .... :::::::::::::::::::::::::::::::::::: =.
::: ::::::: '-:' .... --:' .-: :.:::':::=::::::$h~Jb¥~Jii'~, '~ntuc~:~=:- ':::::::::: :--::::::::':::: .:: .:: .: :':....:..:-:i::::::::. :.:::::::::: :::?: ::::?:'" ....-..:.:-::::::::' '::"::::::!::
I TRACE NUMBERi 230102778
0997587
WELL PERMIT CHECKLIST
FIELD & POOL
ADMINISTRATION
COMPANY .~2~[''' ~ WELL NAME//¢i~:2/,~_ //~...-~:~,/~ PROGRAM: exp~
, ...........
DATE
1. Permit fee attached ............... :-~-. :' :-~- ': - 'i ............ N
2. Lease number appropriate.-,~ ~.-~'. ,~¢~--~ .~.~ ./.O..:-¢~/
3. Unique well name and number ..................
4. Well located in a defined pool .................. .N
5, Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells .......... N
7. Sufficient acreage available in drilling unit ............
8. If deviated, is wellbore plat included ...............
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11, Permit can be issued without conservation order ........
12. Permit can be issued without administrative approval ......
N
dev v/ redrll J serv___ wellbore seg ann. disposal para req.__
____~(__~ ___ UNIT# .... _.~,~.1~,~O .... ON/OFF SHORE ~. .
ENGINEERING
Can permit be approved before 15-day wait ...........
14. Conductor string provided
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved, . .
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to .... ~.~_~'_(~_. ......... psig.
27. Choke manifold complies w/APl RP-53 (May 84) ........
28. Work will occur without operation shutdown ...........
29. Is presence of H~S gas probable .................
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures .....
31. Data presented on potential overpressure zones ...... ,,4,/~ Y N
32. Seismic analysis of shallow gas zones ........... /,t/,,~ Y N
Y
DATE
33. Seabed condition survey (if off-shore) ........... ,,,/,,/',~ ;Y,,, N
34. Contact name/phone for weekly progress repods [exploratory only~ N
ANNULAR DISPOSAL 35.
With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; .......
(B) will not contaminate freshwater'; or cause drilling waste...
to surface;
(C) will not impair mechanical integrity of the well used for disposal;
(D) will not damage producing formation or impair recovery from a
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412.
APPR DATE
YY N-"-IY NN .,. ~...~~ ........ .. .....
Y N
.G.._F.O_.L .O.6_~Y: ENGINEERING: ~.u..I._a _r
RPC ...~ BEW ~V~
SF~. JDH ,/_ ~
COMMISSION:
DWJ
RNC
Comments/Instructions:
.-.I
..<
rtl
Z
c:\msoffice\wordian\diana\checklist (rev. 09/27/99)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
.nature is accumulated at the end of the file under APPE .N. DIXi
,,
No'special'effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
SRevision: 3 $
LisLib SRevision: 4 $
Tue Aug 15 17:01:07 2000
Reel Header
Service name ............. LISTPE
Date ..................... 00/08/15
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name ............. LISTPE
Date ..................... 00/08/15
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
KUPARUK RIVER UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
MWD RUN 2
AK-MM-90263
T. MCGUIRE
F. HERBERT
1ST STRING
1L-26A
500292217301
ARCO ALASKA INC.
Sperry Sun
15-AUG-00
MWD RUN 3
AK-MM-90263
P. SMITH
F. HERBERT
32
lin
RI0
566
217
120.50
120.50
86.00
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6.125 7.000 8486.0
RECeIVeD
AUG 2 2000
~OJ~ ,~& Gas Cons. C, ommisslori
2ND STRING 6.125
3RD STRING 6.125
PRODUCTION STRING
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED.
3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER-
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4),
COMPENSATED THERMAL NEUTRON POROSITY (CTN), AND
STABILIZED LITHO-DENSITY
(SLD) .
4. MWD RUN 3 IS DIRECTIONAL WITH DGR AND EWR4.
5. DIGITAL DATA ONLY IS DEPTH SHIFTED/CORRECTED TO THE
PDC GR LOG OF 06/03/91
(SCHLUMBERGER) WITH KBE OF 129' AMSL. ALL LOG DATA
AND LOG HEADER INFORMATI
RETAINS ORIGINAL DRILLER'S DEPTH REFERENCES. THIS
WELL KICKS OFF FROM 11-26
AT 8486'MD, 5393'TVD.
6. MWD RUNS 1-3 REPRESENT WELL 1L-26A WITH API#:
50-029-22173-01.
THIS WELL REACHED A TOTAL DEPTH (TD) OF l1450'MD,
6190'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SS MATRIX,
FIXED HOLE SIZE).
CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE.
CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN).
SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN).
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
MEDIUM
DEEP
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: 6.125"
MUD WEIGHT: 11.8 PPG
MUD SALINITY: 600 PPM CHLORIDES
FORMATION WATER SALINITY: 13000 PPM CHLORIDES
FLUID DENSITY: t.0 G/CC
MATRIX DENSITY: 2.65 G/CC
LITHOLOGY: SANDSTONE
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/08/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
.5000
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
NCNT
RPX
RPS
RPM
RPD
FET
FCNT
PEF
NPHI
ROP
RHOB
DRHO
$
#
BASELINE CURVE FOR SHIFTS:
START DEPTH
8419.5
8480 0
8480 0
8480 0
8480 0
8480 0
8480 0
8480 0
8480 0
8480 0
8490 0
8490 5
8490 5
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
8419 5
8429 5
8434 0
8435 5
8442 0
8457 0
8464 0
8469 5
8481 0
11454 5
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
#
REMARKS:
GR
8419 5
8429 5
8433 0
8435 0
8439 5
8454 0
8461 0
8465 5
8477 0
11450 5
STOP DEPTH
11408 0
10213 5
11415 5
11415 5
11415 5
11415 5
11415 5
10213 5
10228 5
10213 5
11454 5
10228 5
10228 5
EQUIVALENT UNSHIFTED DEPTH
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
MERGED MAIN PASS.
$
BIT RUN NO MERGE TOP MERGE BASE
2 8419.5 10302.0
3 10302.0 11450.5
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
Service Order Units Size Nsam Rep
FT 4 1 68
MWD FT/H 4 1 68
MWD API 4 1 68
MWD OHMM 4 1 68
MWD OHMM 4 1 68
MWD OHMM 4 1 68
MWD OHMM 4 1 68
MWD HOUR 4 1 68
MWD PU-S 4 1 68
MWD CNTS 4 1 68
MWD CNTS 4 1 68
MWD G/CM 4 1 68
MWD G/CM 4 1 68
MWD BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name Service Unit Min Max
DEPT FT 8419.5 11454.5
ROP MWD FT/H 0.02 2446.95
GR MWD API 32.7 421.97
RPX MWD OHMM 1.22 1391.73
RPS MWD OHMM 1.13 861.07
RPM MWD OHMM 1.02 2000
RPD MWD OHMM 1.05 2000
FET MWD HOUR 0.56 32.61
NPHI MWD PU-S 12.62 54.07
FCNT MWD CNTS 149.7 2062
NCNT MWD CNTS 16444.4 44289
RHOB MWD G/CM 2.171 3.334
DRHO MWD G/CM -0.187. 0.357
PEF MWD BARN 2.59 16.31
Mean
9937
57.9699
120.82
9.59521
9.88642
25.5113
29.307
2.4618
40.4643
331.703
22745.1
2.41281
0.0334999
6.52885
Nsam
6071
5930
5978
5872
5872
5872
5872
5872
3468
3468
3468
3477
3477
3498
First
Reading
8419.5
8490
8419.5
8480
8480
8480
848O
8480
8480
8480
8480
8490.5
8490.5
8480
Last
Reading
11454.5
11454.5
11408
11415 5
11415 5
11415 5
11415 5
11415 5
10213 5
10213 5
10213 5
10228 5
10228 5
10228 5
First Reading For Entire File .......... 8419.5
Last Reading For Entire File ........... 11454.5
File Trailer
Service name .......... ...STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/08/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/08/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR
PEF
RPD
FET
NPHI
FCNT
NCNT
RPS
RPX
RPM
ROP
DRHO
RHOB
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
8419.5
8476 0
8476 0
8476 0
8476 0
8476 0
8476 0
8476 0
8476 0
8476 0
8486 0
8486 5
8486 5
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT).:
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
CTN COMP THERMAL NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
STOP DEPTH
10257.0
10224.5
10264.0
10264.0
10209.5
10209.5
10209 5
10264 0
10264 0
10264 0
10302 0
10224 5
10224 5
15-MAR-00
Insite 4.05.2
0.41
MEMORY
10302.0
46.2
94,1
TOOL NUMBER
1441/1414GR4
1441/1414GR4
1441/1414GR4
1441/1414GR4
6.125
8486.0
Water Based
11.80
51.0
9.5
700
3.6
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT}:
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
1.200
.650
1.100
1.600
68.0
130.0
68.0
68.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
NPHI MWD020 PU-S 4 1 68 32 9
FCNT MWD020 CNTS 4 1 68 36 10
NCNT MWD020 CNTS 4 1 68 40 11
RHOB MWD020 G/CM 4 1 68 44 12
DRHO MWD020 G/CM 4 1 68 48 13
PEF MWD020 BARN 4 1 68 52 14
Name Service Unit
DEPT FT
ROP MWD020 FT/H
GR MWD020 API
RPX MWD020 OHMM
RPS MWD020 OHMM
RPM MWD020 OHMM
RPD MWD020 OHMM
FET MWD020 HOUR
NPHI MWD020 PU-S
FCNT MWD020 CNTS
NCNT MWD020 CNTS
RHOB MWD020 G/CM
DRHO MWD020 G/CM
PEF MWD020 BARN
Min
8419.5
0.02
36 95
1 22
1 13
1 02
1 05
0 69
12 62
149.7
16444.4
2.171
-0.187
2.59
Max Mean Nsam
10302 9360.75 3766
2446.95 56.1544 3633
421.97 129.855 3676
1391.73 9.98254 3577
861.07 9.45546 3577
2000 22.7833 3577
2000 24.0655 3577
13.84 2.38816 3577
54.07 40.4643 3468
2062 331.703 3468
44289 22745.1 3468
3.334 2.41281 3477
0.357 0.0334999 3477
16.31 6.52885 3498
First
Reading
8419.5
8486
8419.5
8476
8476
8476
8476
8476
8476
8476
8476
8486.5
8486.5
8476
Last
Reading
10302
10302
10257
10264
10264
10264
10264
10264
10209 5
10209 5
10209 5
10224 5
10224 5
10224 5
First Reading For Entire File .......... 8419.5
Last Reading For Entire File ........... 10302
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/08/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/08/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10257.5 11406 0
RPD 10264 5 11411 5
RPM 10264 5 11411 5
RPS 10264 5 11411 5
RPX 10264 5 11411 5
FET 10264 5 11413 5
ROP 10302 5 11450 5
$
LOG HEADER DATA
DATE LOGGED: 19-MAR-00
SOFTWARE
SURFACE SOFTWARE VERSION: Insite 4.05.2
DOWNHOLE SOFTWARE VERSION: 0.41
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 11450.0
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 60.0
MAXIMUM ANGLE: 92.2
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
TOOL NUMBER
1414GR4
1414GR4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
REMARKS:
$
#
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999
Depth Units .......................
Datum Specification Block sub-type...0
6.125
8486.0
Water Based
11.80
52.0
9.0
600
3.8
1.450
.720
1.000
1.800
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
73.0
151.8
73.0
73.0
Name Service Unit
DEPT FT
ROP MWD030 FT/H
GR MWD030 API
RPX MWD030 OHMM
RPS MWD030 OHMM
RPM MWD030 OHMM
RPD MWD030 OHMM
FET MWD030 HOUR
Min Max Mean Nsam
10257.5 11450.5 10854 2387
0.35 240.57 60.8414 2297
32.7 243.45 106.435 2298
1.92 58.28 8.9915 2295
2.28 58.55 10.5581 2295
2.33 2000 29.7633 2295
2.61 2000 37.4765 2295
0.56 32.61 2.57456 2299
First
Reading
10257 5
10302 5
10257 5
10264 5
10264 5
10264 5
10264 5
10264 5
Last
Reading
11450.5
11450.5
11406
11411.5
11411.5
11411.5
11411.5
11413.5
First Reading For Entire File .......... 10257.5
Last Reading For Entire File ........... 11450.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 00/08/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 00/08/15
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Reel Trailer
Service name ............. LISTPE
Date ..................... 00/08/15
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Scientific
Scientific
Technical
Technical
Services
Services
Physical EOF
Physical EOF
End Of LIS File