HomeMy WebLinkAboutCO 236Conservation Order Cover Page
XHVZE
This page is required for administrative purposes in managing the scanning process. It marks
the extent of scanning and identifies certain actions that have been taken. Please insure that it
retains it's current location in this file.
~-~ ~_2- Conservation Order Category Identifier
Organizing
RESOAN
[] Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED (Scannable with large
plotter/scanner)
[] Maps:
[] Other items
OVERSIZED (Not suitable for
plotter/scanner, may work with
'log' scanner)
[] Logs of various kinds
[] Other
BY:
ARIA
Scanning Preparation
Production Scanning
Stage I PAGE COUNT FROM SCANNED DOCUMENT: ~
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~ YES
NO
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: __ YES __ NO
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES)
General Notes or Comments about this Document:
5/21/03 ConservOrdCvrPg.wpd
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
Re: THE APPLICATION OF SHELL )
WESTERN E & P INC and THE )
AMOCO PRODUCTION COMPANY )
for a revision of Rule 7 )
Conservation Order No. 44 )
which specifies field rules )
for the Middle Ground Shoal )
Field. )
Conservation Order No. 236
Middle Ground Shoal Field
MGS Oil Pools A, B, C, D, E,
F, & G
June 2, 1988
IT APPEARING THAT:
·
Shell Western E & P Inc. submitted the reference
application dated May 11, 1988 to allow changes to the
surface casing setting depth.
·
Notice of opportunity for public hearings on this
request was published in the Anchorage Daily News on
May 4, 1988 pursuant to 20 AAC 25.540.
3.' No protest to the application was filed.
FINDINGS:
1.
·
·
When Rule 7 was established in 1967, wells were drilled
from surface casing depth to total depth and then
cased.
Most wells drilled since 1976 have been completed by
cementing an intermediate casing string above the
productive zone.
Ail formations encountered between the surface casing
shoe and the top of the productive zone are normally
pressured.
4. Competent formations exist as shallow as 800'TVD.
Conservation Order No. 236
June 2, 1988
Page 2
CONCLUSIONS:
Safety would not be reduced by setting surface casing
as shallow as 1000'TVD when an intermediate string is set above
the producing interval.
NOW, THEREFORE, IT IS ORDERED THAT Rule 7 of Conservation Order
No. 44 is repealed and is reenacted to read:
Surface casing must be set and cemented to a depth of
at least 1600 feet TVD if no intermediate casing string will be
set. If an intermediate casing string is set between 4000' TVD
and the shallowest abnormally pressed waterflood zone, surface
casing must be set and cemented to a depth of at least 1000 feet
TVD. In either case, sufficient cement must be used to circulate
to the surface.
DONE at Anchorage, Alaska and dated June 2, 1988.
C. V. Chatt-'~r~'~/sqConservatzon Commis
Alaska Oil and '
s ion
Lonnie C. Sm~th,~Commissioner
Alaska Oil a
W. W. Barnwell, Commissioner
Alaska Oil and Gas Conservation Commission
ALASKA OIL AND GAS
CONSERVATION COMMISSION ,,~?~
STEVE CQWPER, GOVERNQR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY NO:
(907) 276-7542
January 4, 1989
Dear Subscriber:
The Commission inadvertently issued two Conservation Orders under
the number 236. The first one was issued to Shell Western E & P
Inc. and Amoco Production Company and will remain as issued. The
second one was issued to Unocal on July 29, 1988 and shall be
redesignated henceforth as C.O. No. 93A.
Please make the necessary corrections to your files. We regret
any inconvenience.
Very truly yours,
Lonn±e C. Sm±th
Comm±ss±oner
dlf: RAD / CO93A
Notice of Public Hearing
STATE OF ALASKA
Alaska Oil and Gas Conservation Commission
Re: The application of SHELL WESTERN E & P INC. (SWEPI) to amend
Rule 7 of Conservation Order No. 44
Shell Western E & P Inc., by letter dated March 11, 1988,
has requested an amendment to Rule 7 of Conservation Order
No. 44. The amendment would allow changes to the surface casing
setting depth.
A person who may be harmed if the requested order is issued
may file a written protest prior to May 20, 1988 with the Alaska
Oil and Gas Conservation Commission, 3001 Porcupine Drive,
Anchorage, Alaska 99501, and request a hearing on the matter. If
the protest is timely filed, and raises a substantial and materi-
al issue crucial to the Commission's determination, a hearing on
the matter will be held at the above address at 9:00 a.m. on June
7, 1988 in conformance with 20 AAC 25.540. If a hearing is to be
held, interested parties may confirm this by calling the Com-
mission's office, (907) 279-1433, after May 20, 1988. If no
proper protest is filed, the Commission will consider the issu-
ance of the order without a hearing.
W. W. Barnwell
Commis s ioner
Published May 4, 1988
~,' .... ..~'. . . .~
~ "'~.. STATE OF A~SKA'.~'.'~-
'{~ to' ~mend Rule 7 ~.COn~-~
~'~" tl~ Order ~.
~ ,' .... '~. :':,..
· ~'. ~o. ~. The ~mend~ent would
'.~,~.~sing ~fllng d~th.' . r.,,.'
~''; A ~r~ who mey'~ ~erm~.,
:.'..' 011 Ind ~tl (~tlon
~. ~n~hor~, ~l~sk~ ~1~ end'
,. filed, and ~al~S'a, Sub~antltl.~
;~. ~ and materlal'~lSs~ crucial tot
the ~ Comml~slonfs
[.': tlon, a hea~l,~.~:, the mafle~
~ will ~ held.~Mtt~ e~ve
, ~'. dress at
'.". I~,. In c~mance 'With
.~.':.' held, ' Intere~t~
~' confirm thl~',. ~"
~'.:.~ 279-1~, after .~ay ~, 19ffi. If
.~.: no pr~r prote~
'" Comml~l~ wIII.c~slder
~ ' I~uance ~ t~
'. [.,. ~arlng. '.
. . ,
,
:, , ,
';'~IIMICI. M Public
' ,"~' amend' Rule I ~, C~M~a'
, :,fl~Ord~ N°.'u. '~"'
:.:.:.s~,..w.t~n ,E &, inc.,
. ii.er d~J~ ~arch 11~, 19M~ has
,',.','r' uest~ an, amendment' to
' ,,,,',~e 7 M.'C~M~atl°n Or'ri
,' ~,~:No. ~. The amendment ~uld
',:~,jll~' chan~ to the"sudace
. ,, -~slng Mfflng de~h~
,:~',i~ay file':a W iflen prote~ prlorJ
,:;;,f~ ~j~ ,~, ~, W'Wltb"the
';~!!~: J~ Gas, :~M~atlon Corn
:.~ ~nc~a~~
, ~.,.t~e.. ~er
flon, ~ hel . .
~re~ af I
confirm t~l~.~~ ~) _ .. I
· 2~1~, afl
· ~ pr~r pr~tat 'It (i1~, the
commi~l~ ':Jlll' .'c~sidet t~'l
· i.uance ~ t~ 'r~r' wlfho~.:~
,,,,,....
....
PUb: ~ay 4'~, 19~ :'
.... u':.~ ..;.';' "~'."'?~ f. ?
.,..; · .,.:'
F
STATE Of ALASKA
ADVERTISING
ORDER
8605
Anc133rage Daily News
P. O. Box 149001
And3orage, Alaska 99514-9001
Alaska Oil & Gas Cc~mervation Com~ssion
3001 Porcupine Drive -
Anchorage, AK 99501
ADVERTISING ORDER NO.
A0- 08-55
AGENCY CONTACT I DATE OF A.O.
Pat Oldenbtn:g M~y 3, 1988
PHONE /
(907) 279-1433I '-'
DATES ADVERTISEMENT REQUIRED:
May 4, 1988
SPECIAL INSTRUCTIONS:
AFFIDAVIT OF PUBLICATION
UNITED STATES OF AMERICA
STATE OFAlaska ss
Third DIVISION.
BEFORE ME, THE UNDERSIGNED, A NOTARY PUBLIC THIS DAY
PERSONALLY APPEARED Sheila C. Allot WHO,
BEING FIRST DULY SWORN, ACCORDING TO LAW, SAYS THAT
HE/SHE IS THE Legal Ad. Asst. OF
PUBLISHED AT Anchorage
Third AND STATE OFAlaska
Daily News
IN SAID DIVISION
AND THAT THE
ADVERTISEMENT, OF WHICH THE ANNEXED IS A TRUE COPY, WAS
PUBLISHED IN SAID PUBLICATION ON THE 4th DAY OF
May 19 88, AND THEREAFTER FOR~
CONSECUTIVE DAYS, THE LAST PUBLICATION APPEARING ON THE
~ DAY OF 19__, AND THAT THE
RATE CHARGED THEREON IS NOT IN EXCESS OF THE RATE
CHARGED,.PRIVATE INDIVIDUALS.
SUBSCRIBED AND SWORN TO BEFORE ME
THIS4 DAY OF Maq . 1988.
NOTARY PUBLIC F~)R STATE-~)F Alaska
MY COMMISSION EXPIRES Jul q 9 , 1990.
REMINDER--
INVOICE MUST BE IN TRIPLICATE AND MUST REFERENCE
THE ADVERTISING ORDER NUMBER.'
A CERTIFIED COPY OF THIS AFFIDAVIT OF PUBLICATION
MUST BE SUBMITTED WITH THE INVOICE.
ATTACH PROOF OF PUBLICATION HERE.
;'"' ;'t' STATE; OF ALASKA:
.~,~,~,~,~r-; .... Alaska OII end Gas "'
,, ~;:;~:,., ~atl~ ~mmlul~
..,, ~.;. ,,,,, . , . :,~ ~ . , ,
4~yW~ E &,P ~.,'(SWEPO
~" :,~. am~ Rule ~ ~ ~a-.
,,~ , , . ~. ,t..., ,~ ~ >;;~?,,
·.; leff~ dat~ ~arc, 11,'1~,
'.~, ~ an amendm~t
· ~..'Ro~ 7 ~ C~atl~ ~der
,' No. ~ T~ amendme~ ~ld
:." ~11~ chln~ lo t~ .~a,
~:~: ~ ~y ~, I~ with t~ A~s~
.;'-;.,OII ~ 6as Cm~aflm Corn-'
;: ".ml,l~, ~1 P~cupl~ Drive,,
:.*"' rN~ ~ Marl~ ~. ~ mat-
'::'- fUN, aM
:.~ ? fl~, a ~1~{~ ~ 'ma~, '
.~?' will ~ hel~;t~..~l
~.j.*.: drm at 9:~ ~ .~
~ld,' I~,:~1~,' may"
confirm tbl~', b~,,~lllng'
,'. ~I~, ~'~y ~, 1~ If~
~ '~,. ~mml,l~ ~11.~1~ '~
'. ~ ~ ' ~ I/'. t
.., .~
)2-901 (Rev. 6-85)
PUBLISHER
April 26, 1988
~laska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
File: MAG-O59-986.AOGCC
Gentlemen:
Amoco Production Company
P. 0. Box 100779
Anchorage, Alaska 99510
Proposed Change to Conservation Order No. 44, Rule 7
Amoco Production Company has reviewed the change to Conservation Order
No. 44, Rule 7 proposed by Shell Western E&P, Inc. (SWEPI) as set
forth in their March 11, 1988 correspondence to you (copy attached).
Please be advised that Amoco is in agreement with this change as
proposed.
Very truly yours,
M. A. Golas
District Operations Supervisor
Attachment
cc: B. S. Mamerow - Denver D. R. Weekley - Denver
J. D. Hamrick- Denver
M. L. Woodson - SWEPI
KWU/s 1 s
March 14, 1988
Mr. C. V. Chatterton
Alaska Oil and Gas
Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Shell Western E&P Inc.
601 West Fifth Avenue · Suite ~
Anchor age, Al as ka 99~.~!501 '~l'~-~'-"' '-"
"~.¥. ' iRES EN~
Dear Mr. Chatterton'
SUBJECT' MEETING TO DISCUSS PROPOSED CHANGE IN MIDDLE GROUND SHOAL
FIELD CONSERVATION ORDER #44, RULE 7
As discussed with Commissioner Lonnie Smith, a meeting has been
scheduled for Friday, March 18, 1988, at 9'00 a.m. to present Shell
Western's proposal for changing Conservation Order #44, Rule 7.
Enclosed for your information is an outline of the discussion.
We appreciate this opportunity to meet with you.
Very truly yours,
Division Operations Manager
Alaska Division
MLW/SBB/kt
Enclosure
MLW4/031488b
SUBJECT:
Proposed change in MGS surface casing depth field rule
TOPICS OF DISCUSSION'
Present MGS surface casing field rule (established 7/19/67)
Post 1974 MGS wells all have protective casing strings
Weak zone between 2600 and 3000' TVD
Current leak off test information
Casing design safety factors
Savings of $15 to 30M per well, without sacrificing safety
Proposed plan to determine optimum surface casing depth
March 11, 1988
Shell Western E&P Inc.
601 West Fifth Avenue · Suite 810
Anchorage, Alaska 99501
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Gentlemen'
SUBJECT- PROPOSED CHANGE TO CONSERVATION ORDER #44, RULE 7
Shell Western E & P Inc. (SWEPI) proposes an update to Conservation Order
#44, Rule 7 (dated 7/19/67) which pertains to Middle Ground Shoal. The
rule presently reads'
Surface casing must be set and cemented to a
depth of at least 1600 feet. Sufficient cement
must be used to circulate to the surface.
SWEPI proposes the amended rule to read'
Surface casing must be set and cemented to a
~~VF~' depth of at least 1600 feet TVD IF NO INTER-
INTERMEDIATE CASING STRI.NG IS SET BETWEEN 4000'
MA.~I i TVD AND THE SHALLOWEST ABNORMALLY PRESSURED
C ...... ~ATERFLOOD ZONE, SURFACE CASING MUST BE SET AND
ommlssm
Alaska Oi~&GasCons. ~EMENTED TO A DEPTH OF AT LEAST 1000 FEET TVD.
Anchorage IN EITHER CASE, sufficient cement must be used to
circulate to the surface. .~
The present Rule was established approximately two years after the first
production well was drilled. At the time, all wells were drilled from
surface casing to total depth and then cased. Thus, SWEP,I surmises Rule 7
was predicated under this type of well plan. Since 7/19/67, conditions in
Middle Ground Shoal have changed and more information has been obtained.
All SWEPI's Middle Ground Shoal Hemlock formation wells drilled since
1976 have intermediate casing strings. The intermediate casing strings
are required to safely control formation pressures induced by the
waterflood program. All formations between surface and intermediate
casing are normal (virgin) pressured. All abnormally pressured zones are
encountered after intermediate casing is set. Thus, for practical
purposes, the intermediate casing can be considered a deep surface casing
string. See the attached pre and post waterflood program casing well
designs.
The weak (lost circulation) zone off our Platforms is apparently between
2600 and 3000' TVD. Circulation has been lost on 15 occasions below
surface casing. A mud weight of 9.9 to 10.5 ppg was being used 87% of the
VEU7/030988
Page 2
time circulation was lost. On the other hand, at least 18 times a mud
weight of 9.9 to 10.5 ppg has been used to drill surface hole and
circulation has never been lost prior to running casing. The point being,
the weak zone in Middle Ground Shoal has been considerably below the
surface casing shoe, regardless of where surface casing has been set
(surface casing has been set as shallow as 692' TVD when intermediate
casing was run). On the occasions circulation has been lost, past records
of the bit depth, mode of operation, interval where lost circulation pills
were spotted, and the depth the drill string was pulled to regain
circulation all indicate the weak zone is between 2600 and 3000' TVD.
Current leak off test data indicates an 11.0 ppg equivalent mud weight is
obtainable at 800' TVD. An 11.0 ppg leak off is 0.5 to 1.1 ppg heavier
than leak off in the weak zone between 2600 and 3000' TVD. See the
attached formation leak off gradient plot.
Under the proposed plan, the casing design safety factor in collapse is
approximately 1-3/4 and the burst safety factor over 3. SWEPI's objective
(in wells with intermediate casing) is to set surface casing at the deeper
of: 1) the end of the directional angle build section, 2) an 11.0 ppg
fracture gradient at the surface casing shoe, or 3) 1000' TVD.
Setting surface casing shallower represents a savings of $50 per foot, a
savings over $30,000 on some wells. The savings is predominately in
cement and casing material costs. This savings is obtained without
sacrificing the safety or integrity of the operation or wellbore in any
manner.
In summary, SWEPI is convinced surface casing can be set as shallow as
1000' TVD on wells that incorporate an intermediate casing string without
sacrificing safety or increasing risks. The entire industry benefits from
safer, more efficient well programs. SWEPI believes the proposal
presented at the beginning of this letter, backed by the data and
experience of 55 Middle Ground Shoal wells, will be a benefit to the
industry. SWEPI looks forward to your response. If you have any
questions or desire more data, please call me at 263-9625 or Ed Urger at
263-9634.
Sincerely,
Division Operations Manager
MLW/VEU/ljm
cc: C..M. Kidwell
W. F. Simpson
S. B. Brown
Reading File
Houston Production File
VEU7/030988
PRE WATERFLOOD
CASING PROGRAM
POST WATERFLOOD
CASING PROGRAM
rr
Z
MIDDLE GROUND SHq
FORMATION LEAK OFF GRADIENT
0
0
0
---t-- '., -? ......... ~,---~ ..... ~-k.--'~ .... 1-~ ...... ~--'r i--~ .... i'''~ ...... T ......
I- i ~ ~'''~ ] ~-'-] 'I-('PROPOSED MINIMUM.SURFACE 9ASING DEPTH !
' '~ ~ '~ ~1 ........ ~ . ..... ~ i ..... '-~~ t ~ , -'~', ....... i-- -~ "--~, !
,, , ~ .,.. , -i ' X't ..... ~ ~---T-''~ .... .... ~'"~ .... ~'--~ ......... i'
~ I I'" -; ~--1. ....... 1 r'--~--~-'-r--~ ~, ~w ........... ] ~ ] .... ~-'t-~ : ....... ~ ~~ r ....
~ : ~ : ~ -~ ~--~ ..... ~'--i~i .... %-'~--~--~ i-'~'-;'- :---~----H--'---:-~--% i ~~--~--
- -~ .... 1 ..... ' -'-1 ........ ~ ...... ~'--~-" x~ ........ ~ ..... ~--r '--;--' ~r--~
, ~ I , ~ I ........ ~._ !_..k ..... ~_._~ ....... t ....... . ..... ,__.~_.: .... ~. 1._~_,_, , _,_._,~_
, ~,~ I ~!1~I/I/1~ I i I I ~ , ; ~ i 1 , I , ~ , i ~ '.
, .... ~ 7~ 7/~/~ --; ........ -- .......... - ....... ' ......... ~ ..... ~ ...... t--i ......... ~ ........ ~ ..... 1 ........ l-~*--~ ....
1-~~uN~-l' ~ -;~, ; , . t t ,
.......................................... , ............ ~.~__,_~ ............
PROPOSED MINIMUM PROTECTIVE. ~--N~ ...... ~ i~-fl ......
CASING DEPTH I I I ~ ~, I ~ 1
i i ~ ~ l .... q .... ~--"] ..... ~ ..... ~ .............. 1 .... t ....... ~---~ ...... ' ........... ~ ~ ....
I i 2 , ' I ' /
~ --t ......... ~---~ ...... ~ ....... .... ~ .......................... ~ ..... ~-'-
i~ ......... ] ........ :~, i t i I '~X~.' .....
_, ....... I ........................ ......... ..... ....................... ' ..... .....:
I ...... [~'~'~! : ............................... !"e , ......... i- IX---I .......... I ...... i ...... 1 .... ~ ......
1 1 1 I 1
FORMATION LEAK OFF GRADIENT
(equivalent mud weight in ppg)