Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutCO 261Conservation Order Cover Page XHVZE This page is required for administrative purposes in managing the scanning process. It marks the extent of scanning and identifies certain actions that have been taken. Please insure that it retains it's current location in this file. (~¢)_~' _ Conservation Order Category Identifier Organizing RESCAN [] Color items: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED (Scannable with large plotter/scanner) [] Maps: [] Other items OVERSIZED (Not suitable for plotter/scanner, may work with 'log' scanner) [] Logs of various kinds [] Other BY: ~~.~MARIA Scanning Preparation TOTAL PAGES BY: ~¢~:~ ARIA Production Scanning Stage I PAGE COUNT FROM SCANNED DOCUMENT: PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ,~,r YES ~ NO Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES ~ NO (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES) General Notes or Comments about this Document: 5/21/03 ConservOrdCvrPg.wpd • INDEX CONSERVATION ORDER NO. 261 Kuparuk River Field 1) September 18, 1990 ARCO Alaska, Inc. Request for a Spacing Exception, Kuparuk River Field 2) October 3, 1990 Notice of Hearing, Affidavit of Publication CONSERVATION ORDER NO. 261 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Re: THE APPLICATION OF ) ARCO ALASKA, INC for ) an order exempting ) Kuparuk River Unit ) operators from ) requirements of ) 20 AAC 25. 280(a). ) Conservation Order No. 261 Kuparuk River Field Kuparuk River Oil Pool October 23, 1990 IT APPEARING THAT: · ARCO Alaska, Inc, operator of the Kuparuk River Unit (KRU), Kuparuk River Oil Pool, requested the Alaska Oil and Gas Conservation Commission by letter dated September 18, 1990 to exempt all wells in the KRU Kuparuk River Oil Pool from the requirements of 20 AAC 25.280(a). · Notice of Public Hearing on this request was published in the Anchorage Daily News on October 3, 1990 pursuant to 20 AAC 25.540. 3. No protests to the application were received. FINDINGS: I · 20 AAC 25.280(a) requires operators to file an Application for Sundry Approvals (form 10-403) and receive Commission approval prior to performing well workovers. · Current well activity in the KRU Kuparuk River Oil Pool is dominated by the types of workover operations set forth in 20 AAC 25.280(a). · These workover operations include.. 1) perforating or reperforating casing; 2) stimulating; 3)pulling tubing; 4) altering casing; and, 5) repairing well. · Procedures for these well workovers have become standard and routine for wells in the KRU Kuparuk River Oil Pool. · Information required with the Application for Sundry Approvals for these operations is repetitive for wells in the KRU Kuparuk River Oil Pool. Conservation Order~ ~o. 261 October 23, 1990 Page 2 , · · Records and reports of well workovers must be maintained by the operator as required by 20 AAC 25.280(c). Changes in well status or configuration and the results of well workover operations must be reported by the operator on a Report of Sundry Well Operations (form 10-404) as required by 20 AAC 25.280(d). A current schedule of upcoming workover operations is necessary for the Commission to exercise its compliance responsibilities. CONCLUSIONS: Elimination of the requirements of 20 AAC 25.280(a) for all wells in the KRU Kuparuk River Oil Pool of the Kuparuk River Field will not promote waste nor jeopardize correlative rights. NOW, THEREFORE, IT IS ORDERED: Rule 1 The requirements of 20 AAC 25.280(a) are hereby waived for those wells in the KRU Kuparuk River Oil Pool of the Kuparuk River Field. Rule 2 The operator shall provide the Commission with a listing of planned workover operations including the well and intended operation on a weekly basis. DONE at Anchorage, Alaska and dated October 23, 1990. Lon , r. Alaska Oil and Gas Conservatzon Conmission Alaska Oil ~ ,ommlssloner las Conservation Commission ~PHILLIPS Alaska, Inc. A Substd~ry o1' PHILLIPS PETROLEUM COMPANY Steve Bradley Well Operations Supervisor Kuparuk Production NSK-69 Phone: 659-7348 Fax: 659-7314 ..... ONLY.. Comm -~omm .. ,File April 9, 2001 Mr. Daniel Seamount, Chairman Alaska Oil and Gas Conservation Commission 333 West 7" Avenue, Suite 100 Anchorage, Alaska 99501 Dear Mr. Seamount: Attached is a listing of upcoming operations in the KuparUk and Alpine Fields. This listing is provided as required under the terms of Conservation Order No. 261. If additional data or scheduling information is needed, please call. Sincerely, ~,~ Steve Bradley Well Operations Supervisor Attachments cc: File: FAR 040902, ATO 370 WWPL 3.14 RECE/VE ., APt~ j 3 ?001 Alaska Oil & Gas Cons. Anchorage CCmrniss/o, Phillips Alaska. Inc. is a Subsidiary of Phillips Petroleum Company GREATER KUPARUK ENGINEERING WELL WORK PRIORITY J Type DS WL BOPD PR StelWork Description SLICKLINE ComrnentsJStatuslTiming 4/9/OI 3:44 PM Cos/ Property I AFC Cod~Charge Code S lB -11 S 2A -15 S 2X -16 S 3Q -15 S lB -14 S 1L -09 S 1 D -34 S 1D -110 S 1D -113 S 1D -141 S 3A -03 S 2L -3O5 S 3F -15 S 2U -07 S 2X -03 S 3B -10 S 3Q -21 S 3R -25 S 2A -12 S 2H -09 S 2N -337 S 2N -318 S 2N -307 S 2A -13 S 2D -05 S 2N -349 S 2N -325 S 30 -16 S 3N -16 S 2U -14 S 2V -16 S 30 -04 S 2W -10 S 1G -01 S 3C -O6 S 2V -O2 S 3M -24 S lA -19 S 1Y .32 S 3H -26 S 1E -20 S 1 B -05 S 3B -16 S 3A -18 S 3G -07 S 1G -O7 S 1 G -02 S 1Y -04 S 3H -01 S 3J -O6 S lA -18 S 1 B -04 S lB -14 S 1 D -38 S 1F -01 S 1F -02 S 1 F -07 S 1G -17 S 1H -06 S 1H -O8 S 1H -11 S 1H -15 S 1H -16 S 1J -O3 S 1J -03 S 1J -09 S 1L -14 S 1 L -28 S 1 R -O9 S 1R -12 S 1R -26 S 1Y -31 SE 800 700 SE 370 300 200 A 250 250 A 1000 T T w/3F w/3F a 400 300 D,T 500 i 200 A D,T D,T A lO0 lOO lO0 25 A 25 1 1 D & T for LDL; set TTP and CMIT T x IA, pull TTP 2 Pre-Nordic 3 Slickline work 3 Gauge & C-sand injeclivity test 4 1 D & T for LDL; set 'FrP and CMIT T x IA, pull 'I-I'P 5 1 Pull DCR Run DV 6 Post frac GLD 7 1 D&T dummy Run for Add Peals 8 Pull and Replace Pump 9 Troubleshoot Pump (replace SOV) 10 Pull 4.5' Pump 11 1 SBHP/Driff tbg/Pull GHP liner top pkdDrift liner 12 Drift & tag 13 MI IPROF w/SWS PSP tools if possible 14 1 MI IPROF w/SWS PSP tools if possible 15 MI IPROF w/SWS PSP tools if possible 16 G&T, open C Sand, C-only SBHP 17 SBHP,state MIT -- Regulatory in progress 18 State MiT -- Regulatory 19 1 Iso A Sand for C Sand SI Squeeze 20 Open C-sand 21 1 Paraffin Cut & Tag Fill 22 1 Paraffin Cut & Tag Fill 23 MI Injection Profile (tag&drift necessary) 24 Pre-Nordic 3 Slickline work 25 2 Open C sand 26 MI Injection Profile 27 MI Injection Profile (tag&drift necessary) 28 Memory IPROF (MI injection) 29 Gauge & Tag / Inspect Production CVs 30 1 PrelPROF SL- tag/drift 31 Set Pannex Gauges / Run Jet Pump 32 72-hr PBU w/DHSIT - No GLRDI 33 CV Check 34 CV PM 35 Close C Sand for SZT 36 1 PrelPROF SL-tag/drift 37 1 Pull HES ret. Patch; D&Tfor per/s 38 PM CV's 39 install GLD and tag 40 Deepen GLV design 41 Run Gas Lift Design 42 1 Pull BPi and Run BPI w two 1/4" pods 43 G&T, open C Sand, C-only SBHP 44 GLTS & PT tubing / ann comm 45 GLRD for rate 46 CV PM 47 CV PM 48 inspect CV's & AVA 49 1 PDS multi-finger caliper 50 GLRD for maintenance Close & Open C Sand for SZT i 50 Open C sand 370 3 SBHP & GLD i 200 1 Troubleshoot possible obstruction at 13460 pre Log/per/ 200 2 Continue Fishing (post-video log) i Pull Replace sleeve 10 Tag/Close C 150 Drift with Dummy Straddle Run Plug and MITT i SBHP (4 day SI needed) 1 D&T for DEFT/PPROF 1 D&T for Opportunity DEFT/PPROF SBHP (1 day SI needed) 500 1 Pest Rig Pull DCR/Run DV 500 3 Dummy Gun run 20'x2.5" 500 1 Post Rig Pull DCPJ Run DV i 1 D&T for IPROF 25 Install GLD i 50 SBHP 2 CV Check i 1 C sand AVA PM, D&T pre IPROF 100 tag tt plug gage tubing Ann Comm-T x IA communication, failed MIT (camp grey-water injector) Ready affer packer test completes on 04/09 Well is SI, suspect C-sand is scalled off on this 5000 bfpd producer Ann Comm-T x IA communication, failed MIT Post rig well work - Ready Well most likely will not flow w/o GL in progress Replace Worn Pump. Economics very favorable (ROR>100%) with run life of ¢ Completed acid flowback. AFC for expense rig workover being written; rig expected late April Prep well CT Acid stimulation; acid stim tool ready in -2-3 weeks In prep for e-line log. Try to get ASAP, ready to convert to water; w/2U & 2X work Ready - priority moved up to do with 3F-15 MI profile Ready - priority moved up to do with 3F-15 MI profile MI coming to DS3B in summer; pressure planning Still need MIT w/AOGCC witness & pull plug Ready (no SBHP required, well is not SI) Ready Tag & run HFCVs in post frac well - Pending SI Squeeze Prep for Champion Chemical treatment - schedule -4/16 Prep for Champion Chemical treatment - schedule -4/16 Ready - need to complete by mid-May Nordic 3 to move on well - 04/20 In progress, SBHP complete 2 of 3 DV's replaced w/CV's Ready - need to complete by mid-May Ready - need to complete by mid-May Call PE before scheduling job - check inj rates; G&T probably needed. Way overdue for inspection... Ready - need prior to water conversion. In progress Eval damage, rate down 100 bopd; DO NOT DO GLRD NOW Ready, do in conjunction with 2W-13 PBU CV's in Ground since 7~97 reservoir surveillance Required for Tuan's A-sand Type Curve development due in May FP well & load backside for GL unloading later asset preservation - erosion seen in past 9/99 ready Move OV from sin #1 to stn #2. Ready - well dies Ready **Need A-only SPFO completed first.** MI to DS3B; press planning Identified failed check or GLV out of pocket w/TIFL Well not on OV due to bad unloading valve. **Revised procedurel CV's in Ground since 2/99 CV's in Ground since 4/99 Last cv inspec 7/98 Determine extent of scale deposition for remedial action Big slugger, difficult to test well Pull TPC/wait tor 1 week (for SZT) / Rerun TPC Needed for WF mgmt After FCO Pending Video, fishing tools Pending PWN Eval Shuts in water production will need SI OK to tag while SI - but has WRDP Opportunity pressure Ready Ready Ready Be aware of cement sheath 6000-6130' JT freezing effect across choke with current OV SI injector - Want to BOL after SBHP after scale hydroblast Last PM 2/99, combine with IPRF D&T Eval ability to pull plug from TT - History of bad Csd scale E 23ODS10BL K85329 E 230DS28AO waiting on E 230DS28XL K85329 E 230DS36QL K85329 C 230DS10BG AK0158 E 230DS10GL K85328 C 230DS10DG AK0102 E 25WS1D6EP K85328 E 25WS1D6DL K85328 E 25WS1D6DL K85328 C 230DS36AG AK0132 E 35TN2L1LL K85327 E 230DS36FL K85327 E 23ODS28UL K85327 E 230DS28XL K85327 E 230DS36BL K85329 E 230DS36QL K85329 E 230DS36RL K85329 E 230DS28AL K85329 E 35TN2NSPF K85328 E 35TN2NSPF K65328 E 35TN2N1NL K85327 E 230DS28AO waiting on E 230DS28DL K65329 E 35TN2NSPF K85328 E 35TN2N1NL K@5327 E 230DS36OL K85327 E 230DS36NL K85329 E 230DS28UL K85327 E 230DS28VL K85328 E 230DS36OL K$5327 E 230DS28WL K$5329 E 230DS10GL K65328 E 230DS36HL K85327 E 230DS28VL K85327 E 230DS36ML K65328 E 230DS10AL K85328 E 230DS10YL K85328 E 230DS36HL K85328 E 230DS10EL K85328 E 230DS10BL K85329 E 230DS36BL K85329 E 230DS36AL K85328 E 230DS36GL K85328 E 230DS10GL K85328 E 230DS10GL K65328 E 230DS10YL K85329 E 230DS36HL K65329 E 230DS36JL K65329 E 230DS10AL K85327 E 230DS10BL K85329 C 230DS10BG AK0158 C 230DS10DG AK0094 E 230DS10FL K@5329 E 230DS10FL K85329 E 230DS10FL K85329 E 230DS10GL K85235 E 230DS10HL K85329 E 230DS10HL K85327 E 230DS10HL K85327 E 230DS10HL K85327 E 230DS10HL K85327 C 230DS10JG AK0147 C 230DS10JG AK0147 C 230DS10JG AK0148 E 230DS10LL K85327 E 230DS10LL K85329 E 230DS10RL K85327 E 230DS10RL K85329 E 230DS10RL K85329 E 230DS10YL K85329 KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP,, OP. TP=PENDING WORK Page 1 of 4 GREATER KUPARUK ENGINEERING WELL WORK IType S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP '~TY LIST DS WL BOPD PR StelWork Description 2A -O6 i 2A -22 2B -02 25 2B -03 2C -03 2D -O6B 2G -14 i 2H -04 i 0 2H -05 i D. T 2K -09 30 2M -13 2M -17 2T -15 i 2U -04 150 2U -12 2W -13 T 2Z -15 2Z -19 3A -05 3A -17 3B -14 3C -13 3G -17 3H -18 i 3J -03 3J -17 3K -23 50 3M -01 50 3M -08 3N -07 100 30 -10 i 3Q -10 3Q -11 20 2N -329 D, T 1D -06 1E -21 i 1F -16 1H -15 1L -10 lQ -15 2A -11 200 2B -07 i 2B -10 i 2B -10 i 2C -04 2C -13 2M -30 2M -31 2N-321 A D,T 2N -331 D, T 2N -343 D, T 2T -209 3H -01 20 3H -12 30 -12 3Q -02 2 SI C-sand 1 Install GLD Install GLD Tag Fill 1 Pre IPROF SL- tag/drift SBHP Pull and re-run DV's SBHP on injector Tag Fill/Get Sample 1 New GLD 48 Hour PBU w/DHSIT Tag/Drift & MI Injection Profile Open C Sand / SBHP I Pre Patch SL Lockout SSSV 72 Hour PBU Erosion/scale CV check Shut-In C Sand Lock Out SSSV Gauge & Tag 48-hr PBU Tag & PBU w/DHSlT 1 D&T Troubleshoot injector tubing x 7" ann comm GLRD GLRD Drift for scale 1 Gauge & Tag; dummy gun run GLRD (move OV uphole) 72-hr PBU NO DHSIT; set on collar/tbg stop Lock Out SSSV PBU w/DHSIT GLRD for rate SBHP with a tag&drift Lock Out SSSV CV PM Run tbg plug for Alt MIT 3 Run WRDP after PPROF Open C Sand Tag & SBHP - GLD for A-sand production Close C sand MI Injection Profile Close C sand Tag & Gauge / MI IPROF Memory Log SBHP Opportunity Work MI Injection Profile MI Injection Profile MI Injection Profile (tag&drift necessary) MI Injection Profile (tag&drift necessary) MI Injection Profile (tag&drift necessary) Tag Fill 2 GLRD for rate Lock Out SSSV and/or seal cont'l line leak Memory IPROF Memory IPROF (MI injection) Comments/Status/l'lmln g Ready after IPROF Ready Ready Ready Ready Ready;, data for MI management Ann Comm; T x IA comm, prep for MI injection Ready, well is SI Ready Ready Ready On PWI. Ready Ready Ready Ready Ready Ready - CTU mill complete. Check with PE if well is ready. Ready; well acts plugged; think FP went away; need for pre-ML planning Opportunity pressure Opportunity pressure, last PBU done 5 yrs ago For PPROF, etc. Ready; not a wellhead problem; need to resolve ASAP due to MI @ 3H Ready Ready Ready, rate down slightly; recent scale treatment Pre-C Sand peris Ready - Need for accurate welltests, phase is erratic w/slugging Summer PBU, evaluating skin for 4Q01 WO, corkscrewed tbg Well wagged from MI to water injection, ready Ready; opportunity pressure post -GLS analysis Well is currently on production Complete prior to RIH with any tools CV's in Ground since 2/98 SI wi Derated flowllne 1126/01 after PPROF After HPBD Has Ice plug On hold as C-sand is dpen & no lift gas required Ready On PWI. On hold per Mushovic/Dobson On PWl, Choke Well to 6000 MCFD for 7 Days Prior to Logging Ready after 9/24 On PWI, Evaluating injectivity and possible plugging damage On .PWI,Evaluating tubing restrictions Ready after SRT analysis - need to complete by mid-May Ready after SRT analysis - need to complete by mid-May Ready after SRT analysis - need to complete by mid-May Do Work Next Time Pump is Down On hold pending scale determination SSSV not locked out; can't keep panel pressured; chk'ing PWS sol'n Need tag; well currently on water due to wellhead integrity prob. On water now; gauge & tag & set frac sleeve probably needed 4/9/01 3:44 PM Property Charge Code E 230DS28AI K85327 E 230DS28AL K85329 E 230DS28BL K85329 E 230DS28BL K85329 E 230DS28CL K85327 E 230DS28GL K85329 E 230DS28HL K85329 E 230DS28HL K85329 E 230DS28KL K85329 E 230DS28ML K85327 E 230DS28ML K85327 E 230DS28TL K85329 E 230DS28UL K85329 E 230DS28UL K85329 E 230DS28WL K85327 E 230DS28ZL K85329 E 230DS28ZL K85329 E 230DS36AL K85329 E 230DS36AL K85329 E 230DS36BL K85327 E 230DS36CL K85327 E 230DS36GL K85327 E 230DS36HL K85329 E 230DS36JL K85329 E 230DS36JL K85329 E 230DS36KL K85329 E 230DS36ML K85328 E 230DS36ML K85329 E 230DS36NL K85327 E 230DS36OL K85329 E 230DS36QL K85327 E 230DS36QL K85328 E 35TN2N1NL K85327 E 230DS10DL K85329 E 230DS10GL K85328 E 230DS10FL K85329 E 230DS10HL K85327 C 230DS10LG AK0141 E 230DS10QL K85329 E 230DS28AL K85329 E 230DS28BL K85329 E 230DS28BL K85327 E 230DS28BL K85329 E 230DS28CL K85327 E 230DS28CL K85327 E 230DS28ML K85327 E 230DS28ML K85327 E 35TN2N1NL K85327 E 35TN2N1NL K85327 E 35TN2N1NL K85327 E 38TB2T6CL K85329 E 230DS36HL K85329 E 230DS36HL K85329 E 230DS36OL K85327 E 230DS36QL K85327 KEY: S=SUCKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS. SP, EP, CP, OP, TP=PENDING WORK Poge 2 of 4 GREATER KUPARUK ENGINEERING WELL WORK PRIC~ LIST 4/9/01 3:44 PM DS WL NOB PR SteplWorkDescription Comments/Status/Timing Cost Property IAFC Code Charge Code Cost Codes: C= Capital E= Expense SLICKLINE S Alp -01 B S Berg -02 A S CD1 -03 S CD1 NQ1 S CD1 -01 S CD1 -02 S CD1 -O3 S CD1 -09 S CD1 -10 S CD1 -10 S CD1 -13 S CD1 -16 $ CD1 -17 $ CD1 -21 S CD1 -22 A S CD1 -23 S CD1 -24 $ CD1 -24 S CD1 -25 S CD1 -25 S CD1 -26 S CD1 -27 S CD1 -27 S CD1 -30 S CD1 -30 S CD1 -32 S CD1 -33 S CD1 -34 S CD1 -34 S CD1 -35 S CD1 -36 S CD1 -37 S CD1 -38 S CD1 -39 S CD1 -40 S CD1 -41 S CD1 -42 S CD1 -43 S CD1 -44 S CD1 -45 S CD1 NQ1 $ CD1 -19 A E-LINE E Alp -01 A E Berg -02 A CTU CD1 -01 CD1 -02 CD1 -03 CD1 -10 CD1 -10 CD1 -13 CD1 -16 CD1 -21 CD1 -23 CD1 -24 1 Run observation gauges I Run observation gauges I Drift, tag, SBHP I Drift, tag PBU 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 2 Pull SPM gauges poststartup 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 2 Pull SPM gauges poststartup 2 Pull/run SSSV for spinner 2 Pull SPM gauges poststartup 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for stim 2 Pull/run SSSV for stim 2 Pull/run SSSV for spinner 2 Pull/run SSSV for spinner 3 Drift, tag pre spinner Ready 3/30 Ready 3/30 Repeat of recent SBHP Hold till end of March Ready after 12/15 When CT returns 4/4 Ready after 12/15 Ready after 12/15 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 At end of ice road season 4 Run observation gauges Ready after 3/1/2001 4 Run observation gauges Ready after 3/1/2001 1 Memory spinner log Ready after 3/5 1 Memory spinner log Ready after 3/5 I Memory spinner log Ready after 3/5 I Formic acid stim Ready when CT returns 4/5 I Memory spinner log Ready after 3/5 1 Memory spinner log Ready after 3/5 1 Memory spinner log Ready after 3/5 1 Memory spinner log Ready after 3/5 1 Memory spinner log Ready after 3/5 1 Formic acid stim Ready when CT returns 4/5 C NKALPN4OT C NKALPN4OT E 3ACDO16DH C ASGENR3GN E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH C NKALPN4OT E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH C NKALPN4OT E 3ACDO16DH C NKALPN4OT E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH NKALPN4OT NKALPN4OT 3ACDO16DH 3ACDO16DH 3ACDO16DH 3ACDO16DH 3ACDO16DH 3ACDO16DH 3ACDO16DH 3ACDO16DH 3ACDO16DH 3ACDO16DH 998W01 998W02 B00327 ASD003 B00327 B00327 B00327 998W05 B00328 B00327 B00327 B00327 998W05 B00327 998W05 B00327 B00328 B00327 B00328 B00327 B00327 B00328 B00327 B00328 B00327 B00327 B00327 B00328 B00327 B00328 B00327 B00327 B00328 B00327 B00328 B00328 B00327 B00328 B00328 B00327 B00327 B00327 998W01 998W02 B00327 B00327 B00327 B00328 B00327 B00327 B00327 B00327 B00327 B00328 KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK , Page 1 of 4 GREATER KUPARUK ENGINEERING WELL WOr IORITY LIST 4/9/01 3:44 PM C CD1 °24 C CD1 -25 C CD1 -25 C CD1 -26 C CD1 -27 C CD1 -27 C CD1 -30 C CD1 -30 C CD1 -32 C CD1 -33 C CD1 -34 C CD1 -34 C CD1 -35 C CD1 -36 C CD1 -37 C CD1 -38 C CD1 -39 C CD1 -40 C CD1 -41 C CD1 -42 C CD1 -43 C CD1 -44 C CD1 -45 C CD1 NQ1 O SA OTHER WORK CD1 -14 CD1 -14 1 Memory spinner log MudSOLV stim Memory spinner log Memory spinner log MudSOLV stim Memory spinner log Formic acid stim Memory spinner log Memory spinner log Memory spinner log MudSOLV stim Memory spinner log Formic acid stim Memory spinner log Memory spinner log Formic acid stim Memory spinner log Formic acid stim MudSOLV stim Memory spinner log MudSOLV stim Formic acid stim Memory spinner log Memory spinner log I Ready after 3/5 Ready when CT returns 4/5 Ready after 3/5 Ready after 3/5 Ready when CT returns 4/5 Ready after 3/5 Ready when CT returns 4/5 Ready after 3/5 Ready after 3/5 Ready after 3/5 Ready when CT returns 4/5 Ready after 3/5 Ready when CT returns 4/5 Ready after 3/5 Ready after 3/5 Ready when CT returns 4/5 Ready after 3/5 Ready when CT returns 4/5 Ready when CT returns 4/5 Ready after 3/5 Ready when CT returns 4/5 Ready when CT returns 4/5 Ready after 3/5 Ready after 3/5 1 Flowback post rig 1 Post rig plugs, SBHP Waiting on Doyon 19 I C°st IPr°perty I E 3ACD016DH B00327 E 3ACD016DH B00.~ E 3ACD016DH B003.'117 E 3ACD016DH 1900327 E 3ACD016DH B00328 E 3ACD016DH B00327 E 3ACD016DH B00328 E 3ACD016DH B00327 E 3ACD016DH B00327 E 3ACD016DH B00327 E 3ACD016DH B00328 E 3ACD016DH B00327 E 3ACD016DH B00328 E 3ACD016DH B00327 E 3ACD016DH B00327 E 3ACD016DH B00328 E 3ACD016DH B00327 E 3ACD016DH B00328 E 3ACD016DH B00328 E 3ACD016DH B00327 E 3ACD016DH B00328 E 3ACD016DH B00328 E 3ACD016DH B00327 E 3ACD016DH B00327 C NKALPN4OT 998D02 C NKALPN4OT 998D02 KEY: S=SLICKLINE, E=E-LINE, C=CTU. O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 2 of 4 Type DS WL E-UNE E lB -11 i E 2L -305 E 1D-34 E 3Q -15 E 1D -40 E 30 -19 E 1D -39 E 1 D -38 E 1D -32 E 2V -02 E 1F -01 E 3G -14 E 3M -24 E 3M -01 E 1H -11 E 1D -121 E 1D -135 E 1H -15 ' E 1L -14 i E lQ -23 E 1R -26 i E 1Y -22 E 2A -O6 I E 2C -03 E 2D -13 E 2D -13 E 2U -04 E 2U -14 E 2V -O3 E 2X -01 E 3G -17 E 3J -16 E 30 -05 EP 2N -323 EP 2N -337 EP 1D -102 EP 1 D -124 EP 1D -140 EP 2L -317 EP 3A -15 EP 3F -21 EP 3F -21 GREATER KUPARUK ENGINEERING WELL WORK PRIORITy' BOPD PR StelWork Description CTU SE I 2 T 2 200 3 2 i SE 4 2 A 200 5 1 i T 6 1 i 200 7 1 i 200 8 2 i 200 9 1 T 10 2 200 11 1 A 150 12 100 13 50 14 15 i i 'T A T T New Well New Well LDL for tubing leak. LLR 0.25 BPM SCMT Add Peals LDL for tubing leak. LLR 0.5 BPM Perforate 10900-10944', SBHP Re-run IBP for AOGCC MIT CBL and Peal, SBHP CBL and Perf 13955-14000, SBHP CBL & Perforate 13804-13944, SBHP PW IPROF Run Video Log of fish Video Log 2 SBHP/CH GR/Add-perfs/SBHP/rerun patch 2 Initial peal of C Sands 2 PPROF / GLS / DEFT FBHP/Temp Survey on a live ESP FBHP/I'emp Survey on a live ESP 2 Opportunity PPROF ! GLS / DEFT 2 IPROF after D&T 2 Opportunity PPROF / GLS 2 IPROF after D&T Opportunity PPROF / GLS 2 PW IPROF 2 PW IPROF 2 PPROF PPROF 2 Set tubing patch 2 PW IPROF Waterflow Log PW IPROF 2 PPROF w/poss DEFT, GLS/FBHP IPROF (Tag good- ok to log, PWl) IPROF (SWI) USIT for cement evaluation SCMT FBHP/Temp Survey on a live ESP FBHP/Temp Survey on a live ESP FBHP/'remp Survey on a live ESP Waterflow Log Opportunity IPROF (SWI) 2 $CMT (post CTU cmt sqz) 3 Perf New injector & Initial SBHP (post SCMT) C 3H -11 . 600 1 ECT Repair WO with Coil Platform C 2N -341 500 2 Xylene wash and FCO C 1B-14 370 3 2 FCOPost RigWO C 2L -321 350 4 Cleanout paraffin/hydrates from tubing C 2L -325 350 5 Xylene wash/soak C 2N -326 300 6 Remove Hydrates & paraffin C 2N -335 300 7 Fill Cleanout C lQ -23 200 8 1 FCO (pre PPROF) C 1R -12 50 9 1 Hydroblast Scale C 3M -03 20 10 FCO C 1J -03 500 11 2 FCO 11.1 ppg mud Post Rig C 1J-09 500 12 2 FCO11.9 ppg mud Post Rig C 3A -03 A 1000 2 CT acid stimulation, horiz A Sand well CP 2L-317 A T Cement squeeze CP 2D -03 220 1 Remove Coil Velocity String CP 3F -21 i New Well 1 POSt rig cement sqz to isolate A &C sand CP 3J -07 455 FCO in prep for WO/ST Comments/Status/Timing Ann Comm--T x iA communication, failed MIT. Camp grey-water injector. Need to verify cement integrity for WAMI conversion - REVISED procedure. After Dummy run/after FCO Ann Comm--T x IA communication, failed MIT. Water injector. SCMT tag 11034 3/10 SL pulled previous IBP - check w/PWS for final plan tag 13534 3/27 ddft to 13460 3/10 FCO'd to 14252 2/16; revised depths tag 14100 3/28 check revised perf depths Required for Tuan's A-sand Type Curve development due in May Attempt #3 - ready tag @ 7129' (top A peal) - OK f/log; suspected casing damage After SL prep After D & T after D &T-well changes WC after being on line Well is already equipped with gas meter, ready. Well is already equipped with gas meter, ready. Need one week notice to BOL Be aware of cement sheath 6000-6130' Tag 9333 12/9 will need FCO opportunity work tagged 12/11/00 52' rathole Ready Ready after SL tag/drift Ready after SL tag Ready - IF done ASAP no SL tag needed 2z Ready Evaluate intra C-sand injection for profile mod Ready After Water Injection Restored/Flowiine repairs underway Aft D&T. Call PE if DEFT is not free to confirm running; opp. GLS & FBHP Tag'd @ 8611' on 2/4/01 - no FCO but want splits between A3/A2 Ready; should not need tag Need to verify cement integrity for WAMI conversion Need to verify cement integrity for WAMI conversion Needed for ESP & heat-trace studies, waiting on metering Needed for ESP & heat-trace studies for upcoming development Needed for ESP & heat-trace studies, waiting on metering Reviewing casing re-cement work. Well currently SI for pressure reduction; engineer will notify SCMT 3-5-01: poor bond between A&C sand post rig pending CTU cmt job results - SCMT. Surface work started 3/1. Timing unknown, need to be ready anytime Ready After SL Ready Evaluating cleanout option. In prep for Jet Pump in June Ready Should get rate buzz from FCO need before CV check. Tag'd fill over A1 sands @ 7805' on 1/20/01 Ready - flowline ready mid May Ready - fiowline ready mid May After SL prep work; straddle tool should be ready by last week April SCMT showed poor cement integrity. Waiting for current coil tubing to "mile" out. SCMT 3-5-01: poor bond between A&C sand post rig - need procedure Fill found to 1463' MD; waiting on ST plan to procede 4/9/01 3:44 PM c°=lPr°pe"tY IAFC CodtCharge Code E 230DS10BL K85329 E 35TN2L1LL K85327 C 230DS10DG AK0102 E 230DS36QL K85329 C 230DS10DG AK0129 E 230DS36OL K85329 C 230DS10D(~ AK0121 C 230DS10DG AK0094 C 230DS10DG AK0107 E 230DS28VL k85327 E 230DS10FL K85329 E 230DS36GL K85329 E 230DS36ML K85328 E 230DS36ML K85328 E 230DS10HL K85327 E 25WSl D6EP K85327 E 25WSl D6EP K85327 E 230DS10HL K85327 E 230DS10LL K85327 E 230DS10QL K85329 E 230DS10RL K85327 E 230DS10YL K85327 E 230DS28AL K85327 E 230DS28CL K85327 E 230DS28DL K85328 E 230DS28DL k85327 E 230DS28UL K85329 E 230DS28UL K85327 E 230DS28VL K85327 E 230DS28XL K85327 E 230DS36GL K85327 E 230DS36JL K85327 E 230DS36OL K85327 E 35TN2N1NL K85327 E 35TN2N1NL K85327 E 25WS1D6EP K85327 E 25WS1D6EP K85327 E 25WS1D6EP K85327 C 35TN2N8NG AK0070 E 230DS36AL K85327 C 230DS36FO AK0135 C 230DS36FO AK0135 E 230DS36HO 999556 E 35TN2N1NL K85328 C 230DS10BG AK0158 E 35TN2L1LL K85328 E 35TN2L1LL K85328 E 35TN2N1NL K85328 E 35TN2N1NL K85328 E 230DS10QL K85329 E 230DS10RL K85329 E 230DS36ML K85328 C 230DS10JG AK0147 C 230DS10JG AK0148 C 230DS36AG AK0132 C 35TN2N8NG AK0070 E 230DS28DL K85328 C 230DS36FO AK0135 E 230DS36JL K85329 · KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK. T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Poge 3 of 4 GREATER KUPARUK ENGINEERING WELL WORK P 'ITY LIST J T?o DS WL BOPD pR..S.,elWorkDescription ' I ICOmments/status/'Timing 4/9/01 3:44 PM C°slPr°perty AFC ' 1 CodtCharge Codo OTHER WORK O 1RXX I SBG Treatson1R-03,04A, 13 OP 1D-32 i 200 2 HPBD aP 1D-38 I 200 3 HPBD aP 1D-39 I 200 2 HPBD aP 1D 40 A 200 2 HPBD aP 2N -318 3~ 2 M-209& FM-171 Treatment aP 2N -337 A 4~ 2 M-209 & FM-171 Treatment aP 3H -17 i 5~ A- Sand HPBD will schedule with wells and DSLT Need Proc; After Injectivity test Need Proc; After Injectivity test Need Proc Need Proc; After Injectivity test Schedule following paraffin scrape - chemicals to arrive 4/16 Schedule following paraffin scrape - chemicals to arrive 4/16 Tried 'poor boy' HPBD; still reviewing results per DSE 2/19/01. E 230DS10RL K85328 C 230DS10DG AK0107 C 230DS10DG AK0094 C 230DS10DG AK0121 C 230DS10DG AK0129 E 35TN2N8PF K85328 E 35TN2NSPF K85328 E 230DS36HG 999438 CPF1 SCALE TREATMENTS Sl-4004 SS-5206 PPM BBL~DRUM T1 IE -12 T1 lA -19 T1 1G -13 T1 lC -04 T1 1Y -23 T1 1Y -19 T1P 1Y -28 T1P 2Z -13 I SI-4004 Treatment 2 SI-4004 Treatment NC 3 SI-4004 Treatment NC 4 SI-4004 Treatment C 5 SI-4004 Treatment A 6 SI-4004 Treatment A SI-4004 Treatment NC SI-4004 Treatment 18 2 Ready 7 25 3 Ready 6 17 2 Ready 10 6 1 Ready 12 4 1 Ready 7 7 1 Ready 7 31 3 Hold until wellis RTF;approx 1~01 8 10 1 Hold until wellis RTF 6 37800 98500 1055O0 1042O0 110600 107800 1185OO 1228OO E 230DS10EL K85328 E 230DS10AL K85328 E 230DS10GL K85328 E 230DS10CL K85328 E 230DS10YL K85328 E 230DS10YL K85328 E 230DS10YL K85328 E 230DS28ZL K85328 CPF2 SCALE TREATMENTS SI-4004 SS-5206 PPM BBLS/DRUM T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2P T2P 2T -21 2D -12 2K -09 2M -07 2M -11 2M -13 2M -32 2T -03 2T -17 2V -O9 2W -01 2A -12 2T -37 I SI-4004 Treatment 2 SI-4004 Treatment A 3 2 SI-4004 Treatment - A sd 4 Sl-4004 Treatment A 5 SI-4004 Treatment AJC 6 St-4004 Treatment 7 SI-4004 Treatment 8 SI-4004 Treatment NC 9 SI-4004 Treatment NC 10 SI-4004 Treatment NC 11 SI-4004 Treatment NC 2 SI-4004 Treatment C 2 SI-4004 Treatment NC 5 1 Ready 4 1 Ready 2 1 Ready; Fca complete 02/20 5 1 Ready 4 1 Ready 2 1 Ready 2 1 Ready 2 1 Ready 14 1 Ready 23 2 Ready 33 3 Ready 9 1 Pasta sandlsolation 3 1 Post Gauge & Tag 6 19620O 7 109800 5 86300 7 105600 8 123400 6 71900 6 79700 7 118400 7 11540O 8 110500 7 105500 7 126100 7 115200 E 230DS28TL K85328 E 230DS28DL K85328 E 230DS28KL K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28TL K85328 E 230DS28TL K85328 E 23ODS28VL K85328 E 230DS28WL K85328 E 230DS28AL K85328 E 230DS28TL K85328 CPF3 SCALE TREATMENTS Sl-4004 SS-5206 PPM BBLS/DRUM T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3P T3P T3P 3F -05 I SI-4004 Treatment NC 20 2 Ready 6 3F -06 2 SI-4004 Treatment NC 18 2 Ready 7 3M -23 3 SI-4004 Treatment NC 10 1 Ready; Fill across Perf's 5 3N -09 4 SI-4004 Treatment NC 8 1 Ready; Fill across Perf's 7 3C -11 5 SI-4004 Treatment A/C 2 1 Wellwork completed, ready for treatment 3C -15 6 SI-4004 Treatment C 3 1 Ready 6 3G -18 7 SI-4004 Treatment NC 3 1 Ready 6 3G -21 A 8 SI-4004 Treatment A 2 1 Ready 6 3G -22 9 S1~4004 Treatment A 4 1 Ready 6 3A -05 10 SI-4004 Treatment A/C 3 1 Ready; Lock out SSSV? 6 3F -02 11 SI-4004 Treatment NC 20 2 Ready; has jet pump in well 6 3F -10 12 SI-4004 Treatment NC 23 2 Ready; has jet pump in well 7 3H -23 13 SI-4004 Treatment A 2 1 Ready 6 31-05 14 SI-4004 Treatment A 2 1 Ready 6 3J -19 15 SI-4004 Treatment A 2 1 Ready; Fill across Perf's 6 3Q -11 16 SI-4004 Treatment A 4 1 Ready 6 3Q -22 17 SI-4004 Treatment A 2 1 Ready 6 3R -19 18 SI-4004 Treatment A 7 1 Ready 6 3F -13 A SI-4004 Treatment NC 12 1 Closed C Sand on 3/29 before sqz could 5 3H -01 SI-4004 Treatment - C only 13 1 A sand producing, check residuals 1st. F 7 3N -14 SI-4004 Treatment A 6 1 Flow well for 30 days to reduce BHP Sum of Scale Treatments SI-4004 bbls= 392 55 =bbls S$-5206 108,000 197,200 102,000 137,200 10,100 140,100 137,000 68,000 111,700 96,600 80,900 105,900 43,800 102,100 39,400 113,100 30,000 102,200 99,400 36,400 101,800 E 230DS36FL K85328 E 230DS36FL K85328 E 230DS36ML K85328 E 230DS36NL K85328 E 230DS36CL K85328 E 230DS36CL ,K85328 E 230DS36GL K85328 E 230DS36GL K85328 E 230DS36GL K85328 E 230DS36AL K85328 E 230DS36FL K85328 E 230DS36FL K85328 E 230DS36HL K85328 E 230DS361L K85328 E 230DS36JL K85328 E 230DS36QL K85328 E 230DS36QL K85328 E 230DS36RL K85328 E 230DS36FL K85328 E 230DS36HL K85328 E 230DS36NL K85328 · KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 4 of 4 PHILLIPS Alaska, Inc. A S~bsldlary o{' PHILLIPS PETROLEUM COMPANY Steve Bradley Well Operations Supervisor Kuparuk Production NSK-69 Phone: 659-7348 Fax: 659-7314 April 2, 2001 ONLY Mr. Daniel Seamount, Chairman Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Dear Mr. Seamount: Attached is a listing of upcoming operations in the Kuparuk and Alpine Fields. This listing is provided as required under the terms of Conservation Order No. 261. If additional data or scheduling information is needed, please call. Sincerely, Well Operations SuperviSor Attachments cc: File: FAR 040202, ATO 370 WWPL 3.14 RECEIVED /~PR 1 i ~00~ Alaska Oi~ & Gas Cons. Commission Anchorage Phillips Alaska. Inc. is a Subsidiary of Phillips Petroleum Company 'GREATER KUP~RUK ENGINEERING WELL WORK PRIO~~- ',ST ~' \ 4/2/01 2:48 PM i Type DS WL NOB PR I Step IWork Description Comments/Status/Timing Cost Property 1AFC Code Charge Code ICost CoSes: C= CapitaJ E= Expense SLICKLINE S Alp -01 B I Run observation gauges S Berg -02 A 1 Run observation gauges S CD1 -03 1 Drift, tag, SBHP S CD1 NQ1 I Drift, tag PBU S CD1 -01 2 Pull/run $SSV for spinner S CD1 -02 2 Pull/run SSSV for spinner S CD1 -03 2 Pull/run SSSV for spinner S CD1 -09 2 Pull SPM gauges poststartup S CD1 -10 2 Pull/run SSSV for stim S CD1 -10 2 Pull/run SSSV for spinner S CD1 -13 2 Pull/run SSSV for spinner S CD1 -16 2 Pull/run SSSV for spinner S CD1 -17 2 Pull SPM gauges poststartup S CD1 -21 2 Pull/run S$SV for spinner $ CD1 -22 A 2 Pull SPM gauges poststartup S CD1 -23 2 Pull/run SSSV for spinner S CD1 -24 2 Pull/run SSSV for stim S CD1 -24 2 Pull/run SSSV for spinner S CD1 -25 2 Pull/run SSSV for stim S CD1 -25 2 Pull/run SSSV for spinner S CD1 -26 2 Pull/run SSSV for spinner S CD1 -27 2 Pull/run SSSV for stim S CD1 -27 2 Pull/run SSSV for spinner S CD1 -30 2 Pull/run SSSV for stim S CD1 -30 2 Pull/run SSSV for spinner S CD1 -32 2 Pull/run SSSV for spinner S CD1 -33 2 Pull/run SSSV for spinner S CD1 -34 2 Pull/run SSSV for stim S CD1 -34 2 Pull/run SSSV for spinner S CD1 -35 2 Pull/run SSSV for stim S CD1 -36 2 Pull/run SSSV for spinner S CD1 -37 2 Pull/run SSSV for spinner S CD1 -38 . 2 Pull/run SSSV for stim S CD1 -39 2 Pull/run SSSV for spinner S CD1 -40 2 Pull/run SSSV for stim S CD1 -41 2 Pull/run SSSV for stim S CD1 -42 2 Pull/run SSSV for spinner S CD1 -43 2 Pull/run SSSV for stim S CD1 -44 2 Pull/run SSSV for stim S CD1 -45 2 Pull/run SSSV for spinner S CD1 NQ1 2 Pull/run SSSV for spinner S CD1 -19 A 3 Drift, tag prespinner E-LINE E Alp -01 A 4 Run observation gauges E Berg -02 A 4 Run observation gauges CTU C CD1 -01 1 Memory spinner log C CD1 -02 I Memory spinner log C CD1 -03 I Memory spinner log C CD1 -10 I Formic acid stim C CD1 -10 1 Memory spinner log C CD1 -13 1 Memory spinner log C CD1 -16 1 Memory spinner log C CD1 -21 1 Memory spinner log C CD1 -23 1 Memory spinner log C CD1 -24 1 Formic acid stim Ready 3/30 Ready 3/30 Repeat of recent SBHP Hold till end of March Ready after 12/15 When CT returns 4/4 Ready after 12/15 Ready after 12/15 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 When CT returns 4/4 At end of ice road season Ready after 3/1/2001 Ready after 3/1/2001 Ready after 3/5 Ready after 3/5 Ready after 3/5 Ready when CT returns 4/5 Ready after 3/5 Ready after 3/5 Ready after 3/5 Ready after 3/5 Ready after 3/5 Ready when CT returns 4/5 C NKALPN4OT 998W01 C NKALPN4OT 998W02 E 3ACDO16DH B00327 C ASGENR3GN ASD003 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00327 C NKALPN4OT 998W05 E 3ACD016DH B00328 E 3ACDO'I6DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00327 C NKALPN4OT 998W05 E 3ACDO16DH B00327 C NKALPN4OT 998W05 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH,, B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00327 C NKALPN4OT 998W01 C NKALPN4OT 998W02 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACD016DH B00327 E 3ACD016DH B00327 E 3ACD016DH B00328 * KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK. T=SCALE TREATMENTS, SP, EP, CP. OP. TP=PENDING WORK Page 1 of 2 0 SA "GREATER KUP,~RUK ENGINEERING WELL WORK PRI '.IST CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 CD1 -24 I Memory spinner log Ready after 3/5 -25 1 MudSOLV stim Ready when CT returns 4/5 -25 I Memory spinner log Ready after 3/5 -26 I Memory spinner log Ready after 3/5 -27 I MudSOLV stim Ready when CT returns 4/5 -27 I Memory spinner log Ready after 3/5 -30 I Formic acid stim Ready when CT returns 4/5 -30 I Memory spinner log Ready after 3/5 -32 1 Memory spinner log Ready after 3/5 -33 I Memory spinner log Ready after 3/5 -34 I MudSOLV stim Ready when CT returns 4/5 -34 1 Memory spinner log Ready after 3/5 -35 I Formic acid stim Ready when CT returns 4/5 -36 1 Memory spinner log Ready after 3/5 -37 I Memory spinner log Ready after 3/5 -38 I Formic acid stim Ready when CT returns 4/5 -39 I Memory spinner log Ready after 3/5 -40 I Formic acid stim Ready when CT returns 4/5 -41 I MudSOLV stim Ready when CT returns 4/5 -42 I Memory spinner log Ready after 3/5 -43 I MudSOLV stim Ready when CT returns 4/5 -44 I Formic acid stim Ready when CT returns 4/5 -45 I Memory spinner log Ready after 3/5 NQ1 I Memory spinner log Ready after 3/5 OTHER WORK -14 I Flowback post rig -14 I Post rig plugs, SBHP Waiting on Doyon 19 4/2/01 2:48 PM ] C°st I Pr°perty I E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00328 E 3ACDO16DH B00328 E 3ACDO16DH B00327 E 3ACDO16DH B00327 C NKALPN4OT 998D02 C NKALPN4OT 998D02 * KEY; S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Poge 2 of 2 Comments/Status/Timing 4/2/01 Property Charge Code Cost Codes: C= Capital E: Expense 2:49 PM S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S s S S S S S S S' S S S S S S S S SLICKUNE lB -11 i SE 1 3Q-15 i SE 2 2Z -11 500 3 2N -303 D, 400 4 2N -309 350 2N -319 200 6 I C -07 425 7 1 D -34 200 8 1D-110 A 200 9 1D -141 10 2D-05 i 200 11 2D -05 i 200 12 1R -05 100 13 3H -03 100 14 3F -15 i T 15 2U-07 i w/3F 16 2X-03 i w/3F 17 3M -24 100 18 3Q -21 i T 19 3R -25 i T 2O 30 -04 100 21 2A -12 22 2H -09 23 2N-326 D,T 24 2N -307 D,T 25 2N-349 A D,T 26 2D -08 27 2N-325 D,T 28 2N-321 A D,T 29 2N-331 D,T 30 2N-343 D,T 31 3B -10 32 3B -15 33 30 -16 A 34 1R -20 100 35 2U -14 36 2V -16 100 37 3N -07 100 38 2W -10 39 lC -01 60 40 3C -06 50 41 1L -15 100 42 2V -12 2A -22 2W -13 T lA -18 IA -19 lB -04 i 50 lB -05 i 25 lB -14 1D -38 i 200 1F -02 i 1 F -07 100 1G -02 1G -07 1G -15 50 1G -17 150 1H -06 1H -08 1H -11 1H -15 1H -16 1J -03 500 1 D & T for LDL; set 'I-I'P and CMIT T x IA, pull 'FrP 1 D & T for LDL; set 'I-I'P and CMIT T x IA, pull TTP Open C Sands Tag & Drift Paraffin Cut Paraffin Cut Initial GLD 2 D&T dummy Run for Add Perfs Pull and Replace Pump Pull 4.5" Pump 1 SBHP 2 Open C sand Jet Pump Inspection and nzle up size; LO SSSV Open C Sand MI IPROF w/SWS PSP tools if possible 1 MI IPROF w/SWS PSP tools if possible MI IPROF w/SWS PSP tools if possible 1 Pull HES ret. Patch; D&T for perfs SBHP,state MIT -- Regulatory State MIT -- Regulatory 72-hr PBU w/DHSIT & GLRD 1 Iso A Sand forC Sand SI Squeeze Open C-sand Paraffin Cut & Tag fill MI Injection Profile (tag&drift necessary) MI Injection Profile 1 CIoseC sand MI Injection Profile (tag&drift necessary) MI Injection Profile (tag&drift necessary) MI Injection Profile (tag&drift necessary) MI Injection Profile (tag&drift necessary) G&T, open C Sand, C-only SBHP G&T, open C Sand, C-only SBHP Memory IPROF (MI injection) Changeout DGLV in Prod'n mandrel 1 Pre IPROF SL- tag/drift Set Pannex Gauges / Run Jet Pump 72-hr PBU NO DHSIT; set on collar/tbg stop CV Check Initial GLD Close C Sand for SZT SBHP/Tag Lockout SSSV 1 Install GLD 72 Hour PBU Close & Open C Sand for SZT' PM CV's Open C sand 1 Pull BPI and Run BPI w two 1/4' ports 1 Pull Plug in 'l-r, Pull DCR Run DY Ann Comm--T x IA communication, failed MIT (camp grey-water injector) Ann Comm--T x IA communication, failed MIT In Progress Ready Ready E Ready E Increasing WC well dies-1700 BOPD when flowing E After FCO C Replace Worn Pump. Economics very favorable (ROR>100%) with run life of ( E AFC for expense rig workover being written E Ready After SBHP erosional concerns Potential C Sand eval for jet pump Try to get ASAP, ready to convert to water;, note 2N & 30 work Ready - priority moved up to do with 3F-15 MI profile Ready - priority moved up to do with 3F-15 MI profile FP well & load backside for GL unloading later Ready - SBHP stop depths sent via Email Ready (no SBHP required, well is not SI) Eval damage, rate down 100 bopd; GLRD--Revised proc. Ready Tag & run HFCVs in post frac well - Pending SI. Squeeze Ready Ready - need to complete by mid-May Ready - need to complete by mid-May Data to evaluate drilling candidates. Ready - need to complete by mid-May Ready - need to complete by mid-May Ready - need to complete by mid-May Ready - need to complete by mid-May MI coming to DS3B in summer; pressure planning **Need A-only SPFO completed first.** MI to DS3B; press planning On MI now; gauge & tag probably needed. Leaking DGLV found in 1/13 log Ready - need prior to water conversion. Jet Pump must be in well by 04/01due to MI strategy on 2V drillsite. Ready, evaluating skin for 4Q01 WO, corkscrewed tbg Ready, do in conjunction with 2W-13 PBU Declining GOR - Well ready for Gas lift reservoir surveillance Well SI; If pressure back up will BOL Ready Ready Ready Pull TPC/wait for 1 week (for SZT) / Rerun TPC asset preservation - erosion seen in past 9/99 Needed for WF mgmt 3/14-21/01 Need Proc; Rig Expected c. 3/26 E 230DS10BL E 230DS36QL E 230DS28ZL E 35TN2N8PF 35TN2N8PF 35TN2N8PF 230DS10CL 230DS 10DG 25WS1D6EP 25WS 1 D6DL E 230DS28DL E 230DS28DL E 230DS10RL E 230DS36HL E 230DS36FL E 230DS28UL E 230DS28XL E 230DS36ML E 230DS36QL E 230DS36RL E 230D$36OL E 230DS28AL E 35TN2N8PF E 35TN2N1NL E 35TN2N8PF E 230DS28DL E 35TN2N1NL E 35TN2N1NL E 35TN2N1NL E 35TN2N1NL E 230DS36BL E 230DS36BL E 230DS36OL E 230DS10RL E 230DS28UL E 230DS28VL E 230DS36NL E 230DS28WL E 230DS10CL E 230DS36HL E 230D$10LL E 230DS28VL E 230DS28AL E 230DS28WL E 230DS10AL E 230DS10AL E 230DS10BL E 230DS10BL C 230DS10BG C 230DS10DG E 230DS10FL E 230D$10FL E 230DS10GL E 230DS10GL E 230DS10GL E 230DS10GL E 230DS10HL E 230DS10HL E 230DS10HL E 230DS10HL E 230DS10HL C 230DS10JG 1 Troubleshoot possible obstruction at 13460 pre Log/pod Pull Replace sleeve Pending PWN Eval Tag/Close C CV PM CV's in Ground since 4/99 CV PM CV's in Ground since 2/99 Initial GLD Ready Drift with Dummy Straddle Run Plug and MITT SBHP (4 day SI needed) will need SI 1 D&T for Opportunity DEFT/PPROF I D&T for Opportunity DEFT/PPROF OK to tag while SI - but has WRDP SBHP (1 day SI needed) Opportunity pressure I Post Rig Pull DCR/Run DV Ready K85329 K85329 K85329 K85328 K85328 K85328 K85329 AK0102 K85328 K85328 K85327 K85329 K85329 K85329 K85327 K85327 K85327 K85328 K85329 K85329 K85327 K85329 K85328 K85327 K85328 K85329 K85327 K85327 K85327 K85327 K85329 K85329 K85327 K85329 K85327 K85328 K85327 K85329 K85329 K85327 K85327 K85329 K85329 K85327 K85327 K85328 K85329 K85329 AK0158 AK0094 K85329 K85329 K85328 K85328 K85328 K85235 K85329 K85327 K85327 K85327 K85327 AK0147 · KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK. T=SCALE TREATMENTS, SP, ER CP, OR TP=PENDING WORK Poge 1 of 4 ,,'~REATER KUPA'RUK ENGINEERING WELL WORK PRIORITY I'~' Type S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S .S S S SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP DS WL BOPD PR 1J -03 500 1L -14 i 1L -28 25 1R -09 i 50 1R -12 1 R -26 1Y -04 1Y -31 100 1 Y -32 50 2A -06 2A -15 D, 800 2A -15 2B -02 25 2B -03 2C -03 2D -06B 2G -14 i 2N -04 i 0 2H -05 i D, T 2K -09 30 2M -13 2M -17 2T -15 i 2U -04 150 2V -02 2Z -15 2Z -19 3A -05 3A -17 3B -14 3C -13 3G -07 A 25 3G -17 3H -01 20 3H-18 i 3H -26 50 3J -03 3J -06 i 3J -17 3K-23 · 50 3M -01 50 3M -08 3N -16 30-10 i 3Q -10 3Q -11 20 1D -06 1E -20 1E-21 i 1F -01 200 1F -16 1H -15 lQ -15 2A -11 200 2B -07 i 2B -10 i 2B -10 i 2C -04 2C -13 2M -30 2M -31 2N -318 300 2N -329 D, T 2N-337 A 400 2T -209 3H -01 20 3H -12 i 30-12 i 3Q -02 Work Description 3 Dummy Gun run 20'x2.5' 1 D&T for IPROF Install GLD SBHP 2 CV Check I C sand AVA PM, D&T pre IPROF Inspect CV's & AVA tag tt plug gage tubing Install GLD and tag 2 SI C-sand 1 Open C Sand 2 Open C Sand Install GLD Tag Fill 1 Pre IPROF SL- tag/drift SBHP Pull and re-run DV's SBHP on injector Tag Fill/Get Sample 1 New GLD 48 Hour PBU w/DHSIT Tag/Drift & MI injection Profile Open C Sand / SBHP 1 Pre Patch SL 1 Pre IPROF SL- tag/drift Erosion/scale CV check Shut-In C Sand Lock Out SSSV Gauge & Tag 48-hr PBU Tag & PBU w/DHSIT GLRD for rate 1 D&T 1 PDS multi-finger caliper Troubleshoot injector tubing x 7" ann comm Deepen GLV design GLRD GLRD for maintenance GLRD Drift for scale 1 Gauge & Tag; dummy gun run GLRD (move OV uphole) Gauge & Tag / Inspect Production CVs Lock Out SSSV PBU w/DHSIT GLRD for rate Lock Out SSSV Run Gas Lift Design CV PM 3 Continue Fishing (post-video log) Run tbg plug for Alt MIT 3 Run WRDP after PPROF Tag & SBHP - GLD for A-sand production Close C sand MI Injection Profile Close C sand Tag & Gauge / MI IPROF Memory Log SBHP Opportunity Work MI Injection Profile MI Injection Profile 1 Paraffin Cut & Tag Fill SBHP with a tag&drift 1 Paraffin Cut & Tag Fill Tag Fill 2 GLRD for rate Lock Out SSSV and/or seal cont'l line leak Memory IPROF Memory IPROF (MI injection) Comments/Status/Timing Ready Be aware of cement sheath 6000-6130' JT freezing effect across choke with current OV SI injector - Want to BOL after SBHP after scale hydroblast Last PM 2/99, combine with IPRF D&T Last cv inspec 7198 Eval ability to pull plug from 'I~ - History of bad Csd scale ready Ready after IPROF Ready After Water Flow Log Ready Ready Ready Ready; data for MI management Ann Comm; T x IA corem, prep for MI injection Ready, well is SI Ready Ready Ready On PWI. Ready Ready Ready Ready Ready - CTU mill complete. Check with PE if well is ready. Ready; well acts plugged; think FP went away; need for pre-ML planning Opportunity pressure Opportunity pressure, last PBU done 5 yrs ago Well not on OV due to bad unloading valve. **Revised procedural For PPROF, etc. Determine extent of scale deposition for remedial action Ready; not a wellhead problem; need to resolve ASAP due to MI @ 3H Move OV from stn #1 to sin #2. Ready Big slugger, difficult to test well Ready Ready, rate down slightly; recent scale treatment Pre-C Sand parrs Ready - Need for accurate welltests, phase is erratic w/slugging Way overdue for inspection... Well wagged from MI to water injection, ready Ready; opportunity pressure post -GLS analysis Complete prior to RIH with any tools Need Proc;wait results of scale treat CV's in Ground since 2/98 SI w/Derated fiowllne 1/26/01 Pending Video, fishing tools after PPROF Has Ice plug On hold as C-sand is open & no lift gas required Ready On PWI. On hold per Mushovic/Dobson On PWI, Choke Well to 6000 MCFD for 7 Days Prior to Logging Ready after 9/24 On PWl, Evaluating injactivity and possible plugging damage On PWI,Evaluating tubing restrictions Need Proc; Prep for Champion Chemical treatment Well currently on production and waiting for final SI Need Proc; Prep for Champion Chemical treatment Do Work Next Time Pump is Down On hold pending scale determination SSSV not locked out; can't keep panel pressured; chk'ing PWS sol'n Need tag; well currently on water due to wellhead integrity prob. On water now; gauge & tag & set frac sleeve probably needed 4/2/01 Charge Code C 230DS 10JG E 230DS10LL E 230DS10LL E 230DS10RL E 230DS10RL E 230DS10RL E 230DS10YL E 230DS10YL E 230DS10YL E 230DS28AL E 230DS28AL E 230DS28AL E 230DS28BL E 230DS28BL E 230DS28CL E 230DS28GL E 230DS28HL E 230DS28HL E 230DS28KL E 230DS28ML E 230DS28ML E 230DS28TL E 230DS28UL E 230DS28VL E 230DS28ZL E 230DS28ZL E 230DS36AL · E 230DS36AL E 230DS36BL E 230DS36CL E 230DS36GL E 230DS36GL E 230DS36HL E 230DS36HL E 230DS36HL E 230DS36JL E 230DS36JL E 230DS36JL E 230DS36KL E 230DS36ML E 230DS36ML E 230DS36NL E 230DS36OL E 230DS36QL E 230DS36QL E 230DS10DL E 230DS10EL E 230DS10GL E 230DS10FL E 230DS10FL E 230DS10HL E 230DS10QL E 230DS28AL E 230DS28BL E 230DS28BL E 230DS28BL E 230DS28CL E 230DS28CL E 230DS28ML E 230DS28ML E 35TN2NSPF E 35TN2N1NL E 35TN2N8PF E 38TB2T6CL E 230DS36HL E 230DS36HL E 230DS36OL E 230DS36QL 2:49 PM AK0147 K85327 K85329 K85327 K85329 K85329 K85329 K85329 K85328 K85327 K85329 K85329 K85329 K85329 K85327 K85329 K85329 K85329 K85329 K85327 K85327 K85329 K85329 K85327 K85329 'K85329 K85329 K85329 K85327 K85327 K85328 K85327 K85329 K85329 K85328 K85329 K85329 K85329 K85329 K85328 K85329 K85329 K85329 K85327 K85328 K85329 K85328 K85328 K85329 K85329 K85327 K85329 K85329 K85329 K85327 K85329 K85327 K85327 K85327 K85327 K85328 K85327 K85328 K85329 K85329 K85329 K85327 K85327 KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Poge 2 of 4 GREATER KUPA'RUK ENGINEERING WELL WORK PRIORITY~'?~ · I Type DS WL BOPD PR StelWork Description E-UNE I I IcOmments/status/Timing 4/2/01 2:49 PM Cod~Charge Code , E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EP EP EP EP EP EP EP lB -11 i SE 3Q -15 i SE 30 -19 i T 1D -32 i 200 1D -38 i 200 1D -39 i 200 1D -40 A 200 1 D -34 200 2V -02 3G -14 A 150 3M -24 100 3M -01 50 2L -305 T 2N -323 T 2N -337 A T 1Y -22 2U -04 1D -121 1 D -135 1F -01 200 1H -11 1H -15 1L -14 i lQ -23 1R -26 i 2A -06 I 2C -03 2D -13 2U -14 2V -03 2X -01 3G -17 3J -16 i 30 -05 i 1D -102 1D -124 1D -140 2L-317. A T 3A -15 3F -21 New Well 3F -21 N~w W~ CTU 2 LDL for tubing leak. LLR 0.25 BPM 2 LDL for tubing leak. LLR 0.5 BPM 1 Re-run iBP for AOGCC MI'FI' 2 CBL & Perforate 13804-13944, SBHP 2 CBL and Perf 13955-14000, SBHP 2 CBL and Perf, SBHP I Perforate 10900-10944', SBHP 3 Add Peds 2 PW IPROF Video Log 2 SBHP/CH GR/Add-perfs/SBHP/rerun patch 2 Initial peal of C Sands Cement Bond Log Cement Bond Log Cement Bond Log Opportunity PPROF / GLS 2 Set tubing patch FBHP/Temp Survey on a live ESP FBHP/Temp Survey on a live ESP 2 Run Video Log of fish 2 PPROF / GLS / DEFT 2 Opportunity PPROF / GLS / DEFT 2 IPROF after D&T 2 Opportunity PPROF/GLS 2 IPROF after D&T 2 PW IPROF 2 PW IPROF 2 PPROF 2 PW IPROF Watedlow Log PW IPROF 2 PPROFw/POssDEFT, GLS/FBHP IPROF (Tag good- ok to log, PWI) IPROF (SWI) FBHP/Temp Survey on a live ESP FBHP/Temp Survey on a live ESP FBHP/'I'emp Survey on a live ESP CBL/Perf/ISBHP Opportunity IPROF (SWI) 2 SCMT (post CTU cmt sqz) 3 Perf New Injector & Initial SBHP (post SCMT) Ann Comm-T x IA communication, failed MIT. Camp grey-water injector. E 230DS10BL K85329 Ann Comm-T x IA communication, failed MIT. Water injector. E 230DS36QL K85329 SL pulled previous IBP -- check w/PWS for final plan E 230DS36OL K85329 tag 14100 3/28 check revised perf depths C 230DS10DG AK0107 drift to 13460 3/10 FCO'd to 14252 2/16; revised depths C 230DS10DG AK0094 tag 13534 3/27 C 230DS10DG AK0121 SCMTtag 11034 3/10 C 230DS10DG AK0129 After Dummy run/after FCO C 230DS10DG AK0102 Ready E 230DS28VL k85327 tag @ 7129' (top A peal) - OK f/log; suspected casing damage E 230DS36GL K85329 After SL prep E 230DS36ML K85328 After D & T E 230DS36ML K85328 Need to complete in prep for WAMI conversion. E 35TN2L1LL K85327 Need to complete in prep for WAMI conversion. E 35TN2N1NL K85327 Need to complete in prep for WAMI conversion. E 35TN2N1NL K85327 Ready - tagged 12/11 - ensure well is online before scheduling E 230DS10YL K85327 Need pre patch SL work first E 230DS28UL K85329 Well is already equipped with gas meter, ready. E 25WS1D6EP K85327 Well is already equipped with gas meter, ready. E 25WSID6EP K85327 Attempt #3 - after FCO and SL work E 230DS10FL K85329 after D &T-well changes WC after being on line E 230DS10HL K85327 Need one week notice to BOL E 230DS10HL K85327 Be aware of cement sheath 6000-6130' E 230DS10LL K85327 Tag 9333 12/9 will need FCO E 230DS10QL K85329 opportunity work E 230DS10RL K85327 Ready E 230DS28AL K85327 Ready after SL tag/drift E 230DS28CL K85327 Ready after SL tag E 230DS28DL K85328 Ready E 230DS28UL K85327 Evaluate intra C-sand injection for profile mod E 230DS28VL K85327 Ready After Water Injection Restored/Flowline repairs underway E 230DS28XL K85327 Aft D&T. Call PE if DEFT is not free to confirm running; opp. GLS & FBHP E 230DS36GL K85327 Tag'd @ 8611' on 2/4/01 - no FCO but want splits between A3/A2 E 230DS36JL K85327 Ready; should not need tag E 230DS36OL K85327 Needed for ESP & heat-trace studies, waiting on metering E 25WSID6EP K85327 Needed for ESP & heat-trace studies for upcoming development E 25WS1D6EP K85327 Needed for ESP & heat-trace studies, waiting on metering E 25WS1D6EP K85327 Reviewing casing re-cement work. C 35TN2NSNG AK0070 Well currently SI for pressure reduction; engineer will notify E 230DS36AL K85327 SCMT 3-5-01: poor bond between A&C sand post rig C 230DS36FO AK0135 pending CTU cmt job results - SCMT. Surface work started 3/1. C 230DS36FO AK0135 C C C C C C C C C C C CP CP CP CP CP CP CP O OP OP OP OP OP 3H -11 600 1 D -34 200 1 F -01 200 2L -321 350 2N -335 300 1L-20 a 100 lQ -23 200 1R -12 50 3M -03 20 1J -03 500 1J -09 500 2L -317 A T lB -14 2D -03 220 2L -325 35O 2N -341 500 3F-21 i N*wW.~ 3J -07 455 OTHER WORK I ECT Repair WO with Coil Platform 2 1 FCO for Add perfs 3 1 FCO fill from Fish and reverse out with filtered SW 4 Cleanout paraffin/hydrates from tubing 5 Fill Cleanout 6 FCO (in progress) 7 1 FCO (pre PPROF) 8 1 Hydroblast Scale 9 FCO 10 2 FCO11.1ppg mud Post Rig 11 FCO ?? ppg mud Post Rig Cement squeeze 2 FCO Post Rig WO 1 Remove Coil Velocity String Xylene wash/soak Fill Cleanout 1 Post rig cement sqz to isolate A & C sand FCO in prep for WO/ST 1 R XX I SBG Treats on 1R-03, 04A, 13 1D-32 i 200 3 HPBD ID-38 I 200 3 HPBD 1D-39 I 200 3 HPBD 1D-40 A 200 2 HPBD 2N -318 300 2 M-209 & FM-171 Treatment Timing unknown, need to be ready anytime Pre perf FCO Check w/PWS may have tree leak, May need to pump heavy fluid to get on wE Ready Ready Ready, Fill covering A sand perfs - also pre PPROF Should get rate buzz from FCO Tag'd fill over A1 sands @ 7805' on 1/20/01 Ready Ready SCMT showed poor cement integrity. Need Proc; Rig Expected c. 3/28 Waiting for current coil tubing to "mile" out. Evaluating cleanout option. Evaluating cleanout options using xylene. SCMT 3-5-01: poor bond between A&C sand post rig - need procedure Fill found to 1463' MD; waiting on ST plan to procede Need Proc; After Injectivlty test Need Proc; After Injectlvlty test Need Proc Need Proc; After Injectivlty test Need Proc; Schedule following paraffin scrape E 230DS36HO 999556 C 230DS10DG AK0102 E 230DS10FL K85329 E 35TN2L1LL K85328 E 35TN2N1NL K85328 E 230DS10LL K85328 E 230DS10QL K85329 E 230DS10RL K85329 E 230DS36ML K85328 C 230DS10JG AK0147 C 230DS10JG AK0148 C 35TN2N8NG AK0070 C 230DS10BG AK0158 E 230DS28DL K85328 E 35TN2L1LL K85328 E 35TN2N1NL K85328 C 230DS36FO AK0135 E 230DS36JL K85329 E 230DS10RL K85328 C 230DS10DG AK0107 C 230DS10DG AK0094 C 230DS10DG AK0121 C 230DS10DG AK0129 E 35TN2N8PF K85328 * KEY: S=SLICKLINE, E=E-LINE. C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP. CP, OR TP=PENDING WORK Poge 3 of 4 <GREATER KUPA'RUK ENGINEERING WELL WORK PRIORITy; \ I Type DS WL BOPD PR StelWork Description OP 2N -337 A 400 2 M-2O9&FM-171 Treatment OP 3H -17 i 500 A- Sand HPBD CPF1 SCALE TREATMENTS T1 1E -12 T1 lA -19 T1 1G -13 T1 lC -O4 T1 1Y -23 T1 1Y -19 T1P. 1Y -28 T1P 2Z -13 1 SI-4004 Treatment 2 SI-4004 Treatment NC 3 SI-4004 Treatment NC 4 Sl-4004 Treatment C 5 SI-4004 Treatment A 6 SI-4004 Treatment A SI-4004 Treatment NC SI-4004 Treatment CPF2SCALE TREA3~IENTS T2 2T -21 T2 2D -12 T2 2K -09 T2 2M -07 T2 2M -11 T2 2M -13 T2 2M -32 T2 2T -03 T2 2T -17 T2 2V -09 T2 2W -01 T2P 2A -12 T2P 2T -37 I SI-4004 Treatment 2 SI-4004 Treatment A 3 2 SI-4004 Treatment - A sd 4 SI-4004 Treatment A 5 SI-4004 Treatment A/C 6 SI-4004 Treatment 7 Sl-4004 Treatment 8 SI-4004 Treatment A/C 9 Sl-4004 Treatment A/C 10 SI-4004 Treatment A/C 11 SI-4004 Treatment A/C 2 SI-4004Treatment C 2 SI-4004 Treatment AJC CPF3 SCALE TREATMENTS T3 3F -05 T3 3F -06 T3 3M -23 T3 3N -09 T3 3C -11 T3 3C -15 T3 3G -18 T3 3G -21 T3 3G -22 T3 3A -05 T3 3F -02 T3 3F -10 T3 3H -23 T3 31-05 T3 3J -19 T3 3Q -11 T3 3Q -22 T3 3R -19 T3P 3F -13 T3P 3H -01 T3P 3N -14 SI-4004 SS-5206 18 2 25 3 17 2 6 1 4 1 7 1 31 3 10 1 SI-4004 SS-5206 5 1 4 1 2 1 5 1 4 1 2 1 2 1 2 1 14 1 23 2 33 3 9 1 3 1 SI-4004 SS-5206 I SI-4004 Treatment A/C 20 2 2 SI-4004 Treatment A/C 18 2 3 SI-4004 Treatment A/C 10 1 4 SI-4004 Treatment A/C 8 1 5 SI-4004 Treatment A/C 2 1 6 Sl-4004 Treatment C 3 1 7 SI-4004 Treatment AJC 3 1 8 Sl-4004 Treatment A 2 1 9 SI-4004 Treatment A 4 1 10 SI-4004 Treatment A/C 3 1 11 SI-4004 Treatment A/C 20 2 12 SI-4004 Treatment A/C 23 2 13 SI-4004 Treatment A 2 1 14 Sl-4004 Treatment A 2 1 15 SI-4004 Treatment A 2 1 16 SI-4004 Treatment A 4 1 17 SI-4004 Treatment A 2 1 18 SI-4004 Treatment A 7 1 SI-4004 Treatment A/C 12 1 SI-4004 Treatment - C only 13 1 SI-4004 Treatment A 6 1 Comments/Status/Timing Need Proc; Schedule following paraffin scrape Tried 'poor boy' HPBD; still reviewing results per DSE 2/19/01. PPM BBLS/DRUM Ready 7 37800 Ready 6 98500 Ready 10 105500 Ready 12 104200 Ready 7 110600 Ready 7 107800 Hold until well is RTF; approx 10/01 8 118500 Hold until well is RTF 6 122800 PPM BBLS/DRUM Ready Ready Ready; FCO complete 02/20 Ready Ready Ready Ready Ready Ready Ready Ready Post A sand lsolation Post Gauge & Tag 6 196200 7 1O98O0 5 86300 7 105600 8 123400 6 71900 6 79700 7 118400 7 115400 8 110500 7 105500 7 126100 7 115200 PPM BBLS/DRUM Ready 6 108,000 Ready 7 197,200 Ready; Fill across Perf's 5 102,000 Ready; Fill across Perf's 7 137,200 Wellwork completed, ready for treatment 10,100 Ready 6 140,100 Ready 6 137,000 Ready 6 68,000 Ready 6 111,700 Ready; Lock out SSSV? 6 96,600 Ready; has jet pump in well 6 80,900 Ready; has jet pump in well 7 105,900 Ready 6 43,800 Ready 6 102,100 Ready; Fill across Perf's 6 39,400 Ready 6 113,100 Ready 6 30,000 Ready 6 102,200 Closed C Sand on 3/29 before sqz could 5 99,400 A sand producing, check residuals 1st. F 7 36,400 Flow well for 30 days to reduce BHP 101,800 412/01 2:49 PM C°sl Pr°perry IAFC Cod{Charge Cod~ E 35TN2N8PF K85328 E 230DS36HG 999438 E 230DS10EL K85328 E 230DS10AL K85328 E 230DS10GL K85328 E 230DS10CL K85328 E 230DS10YL K85328 E 230DS10YL K85328 E 230DS10YL K85328 E 230DS28ZL K85328 E 230DS28TL K85328 E 230DS28DL K85328 E 230DS28KL K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28TL K85328 E 230DS28TL K85328 E 230DS28VL K85328 E 230DS28WL K85328 E 230DS28AL K85328 E 230DS28TL K85328 E 230DS36FL K85328 E 230DS36FL K85328 E 230DS36ML K85328 E 230DS36NL K85328 E 230DS36CL K85328 E 230DS36CL K85328 E 230DS36GL K85328 E 230DS36GL K85328 E 230DS36GL K85328 E 230DS36AL K85328 E 230DS36FL K85328 E 230DS36FL K85328 E 230DS36HL K85328 E 230DS361L K85328 E 230DS36JL K85328 E 230DS36QL K85328 E 230DS36QL K85328 .E 230DS36RL K85328 E 230DS36FL K85328 E 230DS36HL K85328 E 230DS36NL K85328 KEY; S=SLICKLINE, E=E. LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, St:), EP, CP, OP, TP=PENDING WORK Poge 4 of 4 ~PHILLIPS Alaska, Inc. A Subsidiary o~ PHILLIPS PETROLEUM COMPANT Steve Bradley Well Operations Supervisor Kuparuk Production NSK-69 Phone: 659-7348 Fax: 659-7314 March 26, 2001 ONLY' Mr. Daniel Seamount, Chairman Alaska Oil and Gas Conservation Commission 333 West 7t" Avenue, Suite 100 Anchorage, Alaska 99501 RECEIVED flPR U 2, Alaska Oil & Gas Cons, Commission Anchorage Alaska Oil& Gas Cons. Anchorage Dear Mr. Seamount: Attached is a listing of upcoming operations in the Kuparuk and Alpine Fields. This listing is provided as required under the terms of If additional data or scheduling information is needed, please call. Sincerely, Well Operations Supervisor Attachments cc: File: FAR 032602, ATO 370 WWPL 3.14 Phillips Alaska. Inc, is a Subsidiary of Phillips Petroleum Company ' GRE ~ATER KUPARUK ENGINEERIN~ WELL WORK PRIORITY ~!~," I Type ! DS WL BOPD PR Ste~Work Description SUCKUNE Comments/Status/Timing 3/27j01 2:24 PM Cos~ Property CodlCharge Code 3Q -15 i 3F -10 1D -42 2Z -11 2L -307 2L -321 2N -303 2N -309 2N -319 1L -11 3F -15 i 1C -07 2A -19 2X -02 i 1D -113 1D -39 i ID -32 i 1D.34 1D 110A 1D -141 IL -09 1R -01 3G -19 2H -09 1G -04 2D -05 2D -05 3G -05 1R -05 3H -03 1L -09 3M -24 3Q -21 3R -25 30 -04 2A -12 2N -326 2N -307 2N -349 2D -08 2N -325 2N .321 2N -331 2N -343 30 -16 1R -20 2U -07 2X -03 2U -14 2V -16 3N -07 2W -10 2W -13 1C -01 3C -06 lA -18 lA -19 lB -04 lB -05 lB -14 1D -38 1F -02 1F -07 1G -02 1G -O7 SE 1 650 2 500 3 500 4 400 5 350 6 D, 400 7 350 8 200 9 300 10 T 11 425 12 300 13 300 14 220 15 200 16 200 17 200 18 200 19 20 200 21 B 110 22 100 23 24 i 200 25 i 200 26 i 200 27 150 28 100 29 100 30 200 31 100 32 i T i T 100 D,T D,T A D,T D,T A D,T D,T D,T A 100 i i 100 100 i 5O i 25 i 200 i 100 i 4 1 33 34 35 36 1 37 38 39 40 1 41 42 43 44 45 46 47 1 48 49 1 50 51 52 53 54 5S D & T for LDL Pull jet pump, tag fill, TS rate loss Post Frac GL Design Open C Sands Paraffin Cut & Tag fill Paraffin Cut/Tag fill/Inspect OV Tag & Drift Paraffin Cut Paraffin Cut Pull DCR run LGLV's MI Injection Profile Initial GLD Hanger tubing screen Open C Sand Pull and Replace Pump Dummy Gun run 20'x2.5' Pull SOV run DV Pull SOV and run DV, Dummy Gun Run D&T dummy Run for Add Perfs Pull and Replace Pump Pull 4.5" Pump Pull Plug Initial GLD D&T/SBHP Open C-sand Open C3,4 Sand SBHP Open C sand Pull DGLV @' 7648', run jet pump & tbg stop Jet Pump Inspection and nzle up size; LO SSSV Open C Sand SBHP & GLD Pull HES ret. Patch; D&T for parrs SBHP,state MIT -- Regulatory State MIT -- Regulatory 72-hr PBU w/DHSIT & GLRD Isa A Sand for C Sand SI Squeeze Paraffin Cut & Tag fill MI Injection Profile (tag&drift necessary) MI Injection Profile Close C sand MI Injection Profile (tag&drift necessary) MI Injection Profile (tag&drift necessary) MI Injection Profile (tag&drift necessary) MI Injection Profile (tag&drift necessary) Memory IPROF (MI injection) Changeout DGLV in Prod'n mandrel MI IPROF MI IPROF Pre IPROF SL - tag/drift Set Pannex Gauges / Run Jet Pump 72-hr PBU NO DHSIT; set on collar/tbg stop CV Check 72 Hour PBU Initial GLD Close C Sand for sz-r Close & Open C Sand for SZT PM CV's Open C sand Pull BPI and Run BPI w two 1/4' ports Pull ~Plug in TT, Pull DCR Run DV Ann Comm-T x IA communication, failed MIT Pulled & reran jet pump during 03/10 wellhead repair, rate down 3300 bpd! In Progress Ready Wel died and waiting on scrape. Ready Ready Ready E 230DS36QL K85329 E 230DS10FL K85328 C 230DS10DG AK0105 E 230DS28ZL K85329 E 35TN2N8PF K85328 E 35TN2N8PF K85328 E 35TN2N8PF K85328 E 35TN2N8PF K85328 E 35TN2N8PF K85328 C 230DS10LG AK0144 E 230DS36FL K85327 E 230DS10CL K85329 E 230DS28AL K85329 E 230DS28XL K85330 E 25WSID6DL K85328 C 230DS10DG AK0121 C 230DS10DG AK0107 C 230DS10DG AK0102 E 25WS1D6EP K85328 E 25WS1D6DL K85328 C 230DS10LG AK0141 C 230DS10RG AK0086 E 230DS36GL K85327 Troubleshoot possible obstruction at 13460 pre Log/pad Pull Replace sleeve Pending PWN Eval Tag/Close C CV PM CV's in Ground since 4/99 CV PM CV's in Ground since 2/99 Try to get ASAP, ready to convert to water; note 2N & 30 work Increasing WC well dies-1700 BOPD when flowing Ready Needs to be done by 3/31/01 Ready IN PROGRESS FCO'd to 13490 2/15 FCO'd to 14083 2/17 After Fca Replace Worn Pump. Economics very favorable (ROR>100%) with run life of ( AFC for expense rig workover being written Ready - Post rig Well dying off-260 Gross Oil Benefit Rig press reduction prep - oil rate is offset prod loss potential, wt'd Tag & run HFCVs in post frac well Needed for EaR/MI management E 230DS10GL K85329 Ready E 230DS28DI. K85327 After SBHP E 230DS28DL K85329 After EL set Eclipse packer & PT integrity E 230DS36GL K85328 erosional concerns E 230DS10RL K85329 Potential C Sand eval for jet pump E 230DS36HL K85329 After CTU Fca before well Is BaL. C. 230DS10LG AK0141 FP well & load backside for GL unloading later E 230DS36ML K85328 Ready - SBHP stop depths sent via Email E 230DS36QL K85329 Ready (no SBHP required, well is not SI) E 230DS36RL K85329 Eval damage, rate down 100 bopd; GLRD--Revlsed proc. E 230DS36OL K85327 Ready E 230DS28AL K85329 Ready E 35TN2NSPF K85328 Ready - need to complete by mid-May E 35TN2NINL K85327 Ready - need to complete by mid-May E 35TN2NSPF K85328 Data to evaluate drilling candidates. E 230DS28DL K85329 Ready - need to complete by mid-May E 35TN2N1NL K85327 Ready - need to complete by mid-May E 35TN2N1NL K85327 Ready - need to complete by mid-May E 35TN2N1NL K85327 Ready - need to complete by mid-May E 35TN2NINL K85327 On MI now; gauge & tag probably needed. E 230DS36OL K85327 Leaking DGLV found in 1/13 log E 230DS10RL K85329 Ready E 230DS28UL K85327 Ready E 230DS28XL K85327 Ready - need prior to water conversion. E 230DS28UL K85327 Jet Pump must be in well by 04/01due to MI strategy on 2V drillsite. E 230DS28VL K85328 Ready, evaluating skin for 4Q01 wa, corkscrewed tbg E 230DS36NL K85327 Ready, do in conjunction with 2W-13 PBU E 230DS28WL K85329 Ready E 230DS28WL K85327 Declining GaR - Well ready for Gas lift E 230DS10CL K85329 reservoir surveillance E 230DS36HL K85327 Pull TPC/wait for 1 week (for SZT) / Rerun TPC E 230DS10AL K85327 asset preservation - erosion seen in past 9/99 E 230DS10AL K85328 Needed for WF mgmt E 230DS10BL K85329 3/14-21/01 E 230DS10BL K85329 Need Proc; Rig Expected c. 3/26 C 230DS10BG AK0158 C 230DS10DG AK0094 E 230DS10FL K85329 E 230DS10FL K85329 E 230DS10GL K85328 E 230DS10GL K85328 · KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page I of 4 GREATER KUPARUK ENGINEERING WELL WORK PRIORITY Type S S S S S S S S S S S S S S S S S S S S S S S S S $ S S S $ $ S S $ $ S $ S $ $ S S S S $ $ S S S $ $ $ $ S SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP DS WL 1G -15 1G -17 1H -06 1H -08 1H -11 1H -15 1H -16 1J -03 1J -03 1L -14 1L -28 1R -09 1R -12 1R -26 1Y-04 1Y -31 1Y -32 2A -06 2A -15 2A -15 2B -02 2B -03 2C -03 2D -06B 2G -14 2H -04 2H -05 2K -09 2M -13 2M -17 2T -15 2U -04 2V -02 2Z -15 2Z -19 3A -05 3A 47 3B -14 3C -13 3G -07 3G-17 3H -01 3H -18 3H -26 3J -03 3J -06 3.1-17 3K -23 3M -01 3M -08 3N -16 30 -10 3Q -10 3Q -11 1D -06 1E -20 1E -21 1F -01 1F -16 1H -15 lQ -15 2A -11 2B -07 2B -10 2B -10 2C -04 2C -13 2M -30 2M -31 2N -329 2T -209 BOPD PR 50 150 500 5O0 25 i 50 i i 100 50 D, 800 25 o D,T 30 i 150 A 25 20 i 50 i 5O 5O i 20 i 200 2O0 i i i D,T Work Description Initial GLD Drift with Dummy Straddle Run Plug and MITT SBHP (4 day SI needed) D&T for Opportunity DEFT/PPROF D&T for Opportunity DEFT/PPROF SBHP (1 day SI needed) Post Rig Pull DCR/Run DV Dummy Gun run 20'x2.5' D&T for IPROF Install GLD SBHP CV Check C sand AVA PM. D&T pre IPROF Inspect CV's & AVA tag tt plug gage tubing Install GLD and tag SI C-sand Open C Sand Open C Sand Install GLD Tag Fill Pre IPROF SL - tag/drift SBHP Pull and re-run DV's SBHP on injector Tag Fill/Get Sample New GLD 48 Hour PBU w/DHSIT Tag/Drift & MI Injection Profile Open C Sand / SBHP Pre Patch SL Pre IPROF SL - tag/drift Erosion/scale CV check Shut-In C Sand Lock Out SSSV Gauge & Tag 48-hr PBU Tag & PBU w/DHSIT GLRD for rate D&T PDS multi-finger caliper Troubleshoot injector tubing x 7" ann comm Deepen GLV design GLRD GLRD for maintenance GLRD Drift for scale Gauge & Tag; dummy gun run GLRD (move OV uphole) Gauge & Tag / Inspect Production CVs Lock Out SSSV PBU w/DHSIT GLRD for rate Lock Out SSSV Run Gas Lift Design CV PM Continue Fishing (post-video log) Run tbg plug for Alt MIT Run WRDP after PPROF Tag & SBHP - GLD for A-sand production Close C sand MI Injection Profile Close C sand Tag & Gauge / MI IPROF Memory Log SBHP Opportunity Work MI Injection Profile MI Injection Profile SBHP with a tag&drift Tag Fill Comments/Status.ri3 ming Ready will need SI OK to tag while SI - but has WRDP Opportunity pressure Ready Ready Be aware of cement sheath 6000-6130' JT freezing effect across choke with current OV SI injector - Want to BOL after SBHP after scale hydroblast Last PM 2/99, combine with IPRF D&T Last cv inspec 7/98 Eval ability to pull plug from 'Ir - History of bad Csd scale ready Ready after IPROF Ready After Water Flow Log Ready Ready Ready Ready; data for MI management Ann Corem; T x IA comm, prep for MI injection Ready, well is SI Ready Ready Ready On PWI. Ready Ready Ready Ready Ready- CTU mill complete. Check with PE if well is ready. Ready; well acts plugged; think FP went away; need for pre-ML planning Opportunity pressure Opportunity pressure, last PBU done 5 yrs ago Well not on OV due to bad unloading valve. **Revised procedural For PPROF, etc. Determine extent of scale deposition for remedial action Ready; not a wellhead problem; need to resolve ASAP due to MI @ 3H Move OV from stn #1 to stn #2. Ready Big slugger, difficult to test well Ready Ready. rate down slightly; recent scale treatment Pre-C Sand peris Ready - Need for accurate welltests, phase is erratic w/slugging Way overdue for inspection... Well wagged from MI to water injection, ready Ready; opportunity pressure post -GLS analysis Complete prior to RIH with any tools Need Proc;wait results of scale treat CV's in Ground since 2/98 SI w/Derated flowline 1/26101 Pending Video, fishing tools after PPROF Has Ice plug On hold as C-sand is open& no lift gas required Ready On PWI. On hold per Mushovic/Dobson On PWl, Choke Well to 6000 MCFD for 7 Days Prior to Logging Ready after 9/24 On PWl. Evaluating injectivity and possible plugging damage On PWI,Evaluating tubing restrictions Well currently on production and waiting for final SI Do Work Next Time Pump is Down 3/27/01 2:24 PM Property Charge Code E 230DS10GL K85328 E 230DS10GL K85235 E 230DS10HL K85329 E 230DS10HL K85327 E 230DS10HL K85327 E 230DS10HL K85327 E 230DS10HL K85327 C 230DS10JG AK0147 C 230DS10JG AK0147 E 230DS10LL K85327 E 230DS10LL K85329 E 230DS10RL K85327 E 230DS10RL K85329 E 230DS10RL K85329 E 230DS10YL K85329 E 230DS10YL K85329 E 230DS10YL K85328 E 230DS28AL K85327 E 230DS28AL K85329 E 230DS28AL K85329 E 230DS28BL K85329 E 230DS28BL K85329 E 230DS28CL K85327 E 230DS28GL K85329 E 230DS28HL K85329 E 230DS28HL K85329 E 230D$28KL K85329 E 230DS28ML K85327 E 230DS28ML K85327 E 230DS28TL K85329 E 230DS28UL K85329 E 230DS28VL K85327 E 230DS28ZL K85329 E 230DS28ZL K85329 E 230DS36AL K85329 E 230DS36AL K85329 E 230DS36BL K85327 E 230DS36CL K85327 E 230DS36GL K85328 E 230DS36GL K85327 E 230DS36HL K85329 E 230DS36HL K85329 E 230DS36HL K85328 E 230DS36JL K85329 E 230DS36JL K85329 E 230DS36JL K85329 E 230DS36KL K85329 E 230DS36ML K85328 E 230DS36ML K85329 E 230DS36NL K85329 E 230DS36OL K85329 E230DS36QL K85327 E 230DS36QL K85328 E 230DS10DL K85329 E 230DS10EL K85328 E 230DS10GL K85328 E 230DS10FL K85329 E 230DS10FL K85329 E 230DS10HL K85327 E 230DS10QL K85329 E 230DS28AL K85329 E 230DS28BL K85329 E 230DS28BL K85327 E 230DS28BL K85329 E 230DS28CL K85327 E 230DS28CL K85327 E 230DS28ML K85327 E 230DS28ML K85327 E 35TN2N1NL K85327 E 38TB2T6CL K85329 · KEY; S=SLICKUNE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, St3, £P, CP, OP, TP=PENDING WORK P°ge 2 of 4 GREATER KUPARUK ENGINEERING WELL WORK PRIORIIY ~' I Type DS WL BOPD PR Ste~Work Description SP 3B -05 i SP 3B -07 i SP 3F -05 100 SP 3H -01 20 SP 3H -12 i SP 30 -12 i SP 3Q -02 PFO w/downhole gauges In conjunction w/pre-MI pressure reduction in spring 2001 PFO w/downhole gauges In conjunction w/pre-MI pressure reduction in spring 2001 Set Baker K-3 Packoff across hole in tubing Waiting for -20 degrees to fill 7' annulus with cold diesel 2 GLRD for rate On hold pending scale determination Lock Out SSSV ancVor seal cont'l line leak SSSV not locked out; can't keep panel pressured; chk'ing PWS sol'n Memory IPROF Need tag; well currently on water due to wellhead integrity prob. Memory IPROF (MI injection) On water now; gauge & tag & set frac sleeve probably needed 3/27/01 2:24 PM CosI Property 1AFC CodtCharge Co ,de E 230DS36BL K85327 E 230DS36BL K85327 E 230DS36FL K85329 E 230DS36HL K85329 E 230DS36HL K85329 E 230DS36OL K85327 E 230DS36QL K85327 E-UNE E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EP EP EP EP EP EP EP 1D -30 300 3Q -15 i SE 30 -19 i T 1D -32 i 200 1D -38 i 200 1D -39 i 200 1 R -29 1D -40 A 200 1 D -34 200 2N -323 T 2N-337 A T 2X -18 200 3G-14 A 150 3M -24 100 3M -01 50 1 D -121 1 D -135 1L -14 2V -03 2U -14 30 -05 3,J -16 1Y -22 2U -04 1F -01 200 1H -11 1H -15 1 Q -23 1 R -26 2A -06 2C -03 2D -13 2V -02 2X -01 3G -17 1 D -102 1 D -124 1 D -140 2L -317 A T 3A -15 i 3F-21 i N~wW~ 3F-21 i N~W~ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2 Add Parrs 2 LDL for tubing leak. LLR 0.5 BPM 1 Re-run IBP for AOGCC Mm' 2 CBL & Perforate 13804-13944, SBHP 2 CBL and Perf 13955-14000, SBHP 2 CBL and Parr, SBHP 4 Cut Tubing 1 Perforate 10900-10944', SBHP 3 Add Pads Cement Bond Log Cement Bond Log FBHP & Gas Lift Survey Video Log 2 SBHP/CH GR/Add-peds/SBHP/rerun patch 2 Initial perf of C Sands FBHP/Temp Survey on a live ESP FBHP/Temp Survey on a live ESP 2 IPROF after D&T Waterflow Log 2 PW IPROF IPROF (SWl) IPROF (Tag good- ok to log, PWI) Opportunity PPROF / GLS 2 Set tubing patch 2 Run Video Log of fish 2 PPROF/GLS/ DEFT 2 Opportunity PPROF / GLS / DEFT 2 Opportunity PPROF / GLS 2 IPROF after D&T 2 PW IPROF 2 PW IPROF 2 PPROF 2 PW IPROF PW IPROF 2 PPROF w/pass DEFT, GLS/FBHP FBHP/Temp Survey on a live ESP FBHP/Temp Survey on a live ESP FBHP/Temp Survey on a live ESP CBI_/Perf/ISBHP Opportunity IPROF (SWI) 2 SCMT (post CTU cml sqz)' 3 Perf New Injector & Initial SBHP (post SCMT) tagged 11824 11/9 C Ann Comm-T x IA communication, failed MIT. Water injector. E SL pulled previous IBP -- check w/PWS for final plan E After Dummy run revised depths C drift to 13460 3/10 FCO'd to 14252 2/16; revised depths C after dummy run C After sand plug - needed for dHIIng C SCMT tag 11034 3/10 C After Dummy run/after Fca C Need to complete in prep for WAMI conversion. E Need to complete in prep for WAMI conversion. E Evaluate well for sudace powered jet pump E tag @ 7129' (top A perf) - OK Flog; suspected casing damage E After SL prep E After D & T E Well is already equipped with gas meter, ready. E Well is already equipped with gas meter, ready. E Be aware of cement sheath 6000-6130' E Evaluate intra C-sand injection for profile mod E Ready E Ready; should not need tag E Tag'd @ 8611' on 2/4/01 - no Fca but want splits between A3/A2 E Ready - tagged 12/11 - ensure well is online before scheduling E Need pre patch SL work first E Attempt #3 - after Fca and SL work E after D &T-well changes WC after being on line E Need one week notice to BOL E Tag 9333 12/9 will need Fca E opportunity work E Ready E Ready after SL tag/drift E Ready after SL tag E Ready E Ready After Water Injection Restored/Flowline repairs underway E Aft D&T. Call PE if DEFT is not free to confirm running; opp. GLS & FBHP E Needed for ESP & heat-trace studies, waiting on metering E Needed for ESP & heat-trace studies for upcoming development E Needed for ESP & heat-trace studies, waiting on metering E Reviewing casing re-cement work. C Well currently SI for pressure reduction; engineer will notify E SCMT 3-5-01: poor bond between A&C sand post rig C pending CTU cmt job results - SCMT. Surface work started 3/1. C 230DS10DG AK0096 230DS36QL K85329 230DS36OL K85329 230DS10DG AK0107 230DS10DG AK0094 230DS10DG AK0121 230DS10RG AK0159 230DS10DG AK0129 230DS10DG AK0102 35TN2N1NL K85327 35TN2N1 NL K85327 230DS28XL K85327 230DS36GL K85329 230DS36ML K85328 230DS36ML K85328 25WS1D6EP K85327 25WS1D6EP K85327 230DS10LL K85327 230DS28VL K85327 230DS28UL K85327 230DS36OL K85327 230DS36JL K85327 230DS10YL K85327 230DS28UL K85329 230DS10FL K85329 230DS10HL K85327 230DS10HL K85327 230DS10QL K85329 230DS10RL K85327 230DS28AL K85327 230DS28CL K85327 230DS28DL K85328 230DS28VL k85327 230DS28XL K85327 230DS36GL K85327 25WS1D6EP K85327 25WS1D6EP K85327 25WSID6EP K85327 35TN2N8NG AK0070 230DS36AL K85327 230DS36FO AK0135 230DS36FO AK0135 CTU 3F -13 A 280 I Pull/rerun C Sand isa sleeve 1D -34 200 2 1 Fca for Add perfs 1F -01 200 3 1 Fca fill from Fish and reverse out with filtered SW 1L-11 300 4 2 FCOPostRig 2N -335 300 5 Fill Cleanout 1L -09 200 6 1 Post Rig Fca fill from TT plug 1L-09 200 7 3 Post Rig Fca 1F -18 100 9 Fca 2A -13 10 2 Pre Workover Hydroblast Scale 1L -10 i 11 Post Rig work Fca Mud and hard fill 1L-20 a 100 12 Fca lQ -23 50 13 1 Fca (pre PPROF) 1R-12 50 14 1 Hydroblast Scale 3M -03 20 15 Fca Attempted set on 03/17; WT & FTT show C Sand still open Pre perf Fca Check w/PWS may have tree leak, May need to pump heavy fluid to get on wE need proc Ready 30' fill on 'rr plug After pull Plug in X nipple - Min ID 1.875" Ready, Fill covering A Sand perfs - also pre PPROF Need For prerig workover by 03/30 Ready, Fill covering A sand perfs - also pre PPROF Tag'd fill over A1 sands @ 7805' on 1/20/01 E 230DS36FL K85329 C 230DS10DG AK0102 E 230DS10FL K85329 C 230DS10LG AK0144 E 35TN2N1NL K85328 C 230DS10LG AK0141 C 230DS10LG AK0141 E 230DS10FL K85328 E 230DS28AL K85328 C 230DS10LG AK0143 E 230DS10LL K85328 E 230DS10QL K85329 E 230DS10RL K85329 E 230DS36ML K85328 · KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 3 of 4 GREATER KUPARUK ENGINEERING WELL WORK PRIORIIY LI~ · Type DS WL C 1J .03 C 3H -11 CP 1D -37 CP 2L-317 A CP lB -14 CP 2D .03 220 CP 2L -325 350 CP 2N .341 500 CP 3F-21 i CP 3J -07 455 ! BOPD PR Stel~Work Description 500 16 2 FCO11.1ppg mud Post Rig 600 17 ECT Repair WO with Coil Platform 500 2 FCO T Cement squeeze 2 FCO Post Rig WO 1 Remove Coil Velocity String Xylene washJsoak Fill Cleanout 1 Post dg cement sqz to isolate A & C sand FCO in prep for WO/ST OTHER WORK O 1 R -29 OP 1D -32 i 200 OP 1D-38 I 20O OP 1D-39 I 200 OP 1D-40 A 200 OP 3H-17 i 500 2 Pump Sand Plug 3 HPBD 3 HPBD 3 HPBD 2 HPBD A- Sand HPBD CPF1 SCALE TREATMENTS T1 lA -19 T1 1G -13 T1 lC .04 T1 1Y -23 T1 1Y -19 T1P 1E -12 TIP 1Y -28 T1P 2Z -13 1 SI-4004 Treatment A/C 2 SI-4004 Treatment A/C 3 SI-4004 Treatment C 4 SI-4004 Treatment A 5 SI-4004 Treatment A SI-4004 Treatment SI-4004 Treatment A/C SI-4004 Treatment CPF2 SCALE TREATMENTS T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2P T2P 2T -21 2C -16 2A .05 2D -12 2K .09 2M .07 2M -11 2M -13 2M -32 2T -03 2T -17 2V -09 2W -01 2A -12 2T -37 1 2 3 4 5 2 6 7 8 9 10 11 12 13 2 2 SI-4004 Treatment SI-4004 Treatment. SI-4004 Treatment A/C SI-4004 Treatment A SI.4004 Treatment - A sd SI-4004 Treatment A S1~4004 Treatment A/C SI-4004 Treatment SI-4004 Treatment S1~4004 Treatment A/C SI-4004 Treatment A/C Sl-4004 Treatment A/C SI-4004 Treatment A/C SI-4004 Treatment C Sl-4004 Treatment A/C CPF3SCALETREATMENTS T3 3F -05 T3 3F -06 T3 3M -23 T3 3N -09 T3 3C -11 T3 3C -15 T3 3G -18 T3 3G -21 T3 3G -22 T3 3A -05 T3 3F -02 T3 3F-10 T3 3H -23 T3 31-05 T3 3J -19 T3 3Q -11 T3 3Q -22 T3 3R -19 T3P 3F -13 T3P 3H -01 T3P 3N -14 SI-4004 SS-5206 25 3 17 2 6 1 4 1 7 1 18 2 31 3 10 1 SI-4004 SS-5206 Comments/Status/Timing Ready Timing unknown, need to be ready anytime 2nd FCO Post Frac - Warranty work pending GLD results SCMT showed poor cement integrity. Need Proc; Rig Expected c. 3/28 Waiting for current coil tubing to 'mile' out. Evaluating cleanout option. Evaluating cleanout options using xylene. SCMT 3-5-01: poor bond between A&C sand post rig - need procedure Fill found to 1463' MD; waiting on ST plan to procede Needed for Drilling after SL work Need Proc; After Injectlvity test Need Proc; After Injectivlty test Need Proc Need Proc; After Injectlvity test Tried 'poor boy' HPBD; still reviewing results per DSE 2/19/01. PPM BBLS/DRUM Ready 6 98500 Ready 10 105500 Ready 12 104200 Ready 7 110600 Ready 7 107800 Well SI 7 37800 Hold until well is RTF; approx 10/01 8 118500 Hold until well is RTF 6 122800 5 1 Ready 25 3 Ready 20 2 Ready 4 1 Ready 2 1 Ready; FCO complete 02/20 5 1 Ready 4 I Ready 2 I Ready 2 1 Ready 2 1 Ready 14 I Ready 23 2 Ready 33 3 Ready 9 I Post A sand lsolation 3 1 Post Gauge & Tag SI-4004 SS-5206 PPM BBLS/DRUM 6 196200 6 89600 7 103300 7 109800 5 86300 7 105600 8 123400 6 71900 6 79700 7 118400 7 115400 8 110500 7 105500 7 126100 7 115200 PPM BBLS/DRUM I SI-4004 Treatment A/C 20 2 Ready 6 2 SI.4004 Treatment A/C 18 2 Ready 7 3 Sl-4004 Treatment A/C 10 1 Ready; Fill across Perf's 5 4 SI-4004 Treatment AJC 8 1 Ready; Fill across Perf's 7 5 SI-4004 Treatment A/C 2 I Wellwork completed, ready for treatment 6 SI.4004 Treatment C 3 1 Ready 6 7 SI.4004 Treatment A/C 3 1 Ready 6 A 8 Sl-4004 Treatment A 2 1 Ready 6 9 SI-4004 Treatment A 4 I Ready 6 10 SI-4004 Treatment A/C 3 1 Ready; Lock out SSSV? 6 11 SI-4004 Treatment A/C ,20 2 Ready; has jet pump in well 6 12 SI-4004 Treatment A/C 23 2 Ready; has jet pump in well 7 13 SI-4004 Treatment A 2 I Ready 6 14 SI.4004 Treatment A 2 1 Ready 6 16 Sl-4004 Treatment A 2 I Ready; Fill across Perf's 6 16 SI-4004 Treatment A 4 1 Ready 6 17 SI-4004 Treatment A 2 I Ready 6 18 SI.4004 Treatment A 7 1 Ready 6 A SI.4004 Treatment A/C 12 1 Closed C Sand before sqz could happen 5 SI-4004 Treatment - C only 13 1 A sand producing, check residuals 1st. F 7 SI-4004 Treatment A 6 1 Flow well for 30 days to reduce BHP Sum of Scale Treatments Sl-4004 bbls= 437 60 =bbls SS-5206 108,000 197,200 102,000 137,200 10,100 140,100 137,000 68,000 111,700 96,600 80,900 105,900 43,800 102,100 39,400 113,100 30,000 102,200 99,400 36,400 101,800 3/27/01 2:24 PM Cos~Property ~AFC Cod{Charge Code C 230DS10JG AK0147 E 230DS36HO 999556 C 230DS10DG AK0123 C 35TN2N8NG AK0070 C 230DS10BG AK0158 E 230DS28DL K85328 E 35TN2L1LL K85328 E 35TN2N1NL K85328 C 230DS36FO AK0135 E 230DS36JL K85329 C 230DS10RG AK0159 C 230DS10DG AK0107 C 230DS10DG AK0094 C 230DS10DG AK0121 C 230DS10DG AK0129 E 230DS36HG 999438 E 230DS10AL K85328 E 230DS10GL K85328 E 230DS10CL K85328 E 230DS10YL K85328 E 230DS10YL K85328 E 230DS10EL K85328 E 230DS10YL K85328 E 230DS28ZL K85328 E 230DS28TL K85328 E 230DS28CL K85328 E 230DS28AL K85328 E 230DS28DL K85328 E 230DS28KL K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28TL K85328 E 230DS28TL K85328 E 230DS28VL K85328 E 230DS28WL K85328 E 230DS28AL K85328 E 230DS28TL K85328 E 230DS36FL K85328 E 230DS36FL K85328 E 230DS36ML K85328 E 230DS36NL K85328 E 230DS36CL K85328 E 230DS36CL K85328 E 230DS36GL K85328 E 230DS36GL K85328 E 230DS36GL K85328 E 230DS36AL K85328 E 230DS36FL K85328 E 230DS36FL K85328 E 230DS36HL K85328 E 230DS361L K85328 E 230DS36JL K85328 E 230DS36QL K85328 E 230DS36QL K85328 E 230DS36RL K85328 E 230DS36FL K85328 E 230DS36HL K85328 E 230DS36NL K85328 · KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Pctge 4 of 4 I Type ., GRE, ATER KUPARUK ENGINEERING WELL WORK PRIORI~ DS WL NOB PR SteplWork Description Comments/Status/Timing 3/27/01 2:25 PM ICost I Pr°pert7 CodeICharge Code ICost Codes: C= Capital E= Expense IAFC SLICKLINE CD2 -35 1 Drift, tag, pull gauges, SBHP CD1 -17 2 Pull SPM gauges poststartup CD1 -03 3 Ddft, tag, SBHP CD1 -04 3 Pull SPM gauges poststartup CD1 -10 3 Pull SPM gauges poststartup CD1 -22 A 3 Pull SPM gauges poststartup CD1 NQ1 3 Drift, tag PBU WD -02 3 SSSV post MIT Alp -01 B 4 Prep for observation gauges Berg -02 A 4 Pull gauges for pulse test Berg -02 A 4 Prep for observation gauges CD1 -19 A Drift, tag, SBHP E-LINE CD1 -26 2 WFL Alp -01 A 4 Run observation gauges Alp -01 A 4 Clean out for obs gauges Berg -02 A 4 Run observation gauges CTU CD1-10 I Memory spinner log CD1 -24 I Memory spinner log CD1 -25 1 Memory spinner log CD1 -27 1 Memory spinner log CD1 -30 I Memory spinner log OTHER WORK CD1 -21 CD1 -16 CD1 -23 CD1 -25 CD1 -27 CD1 -38 CD1 -43 CD1 -44 Needs wellhead dug out Ready after 12/15 Repeat of recent SBHP Ready after 12/15 Ready after 12/15 Ready after 12/15 Hold till end of March Annual MIT Ready after 3/1/2001 Ready after 3/1/2001 Ready after 3/1/2001 Ready after 3/2 Combo with SCMT jobs Ready after 3/1/2001 Ready after 3/1/2001 Ready after 3/1/2001 Ready after 3/5 Ready after 3/5 Ready after 3/5 Ready after 3/5 Ready after 3/5 3 Flowback injection well prestartup Ready after 1/29 4 Flowback injection well prestartup Ready after 10/30 4 Flowback injection well prestartup Ready after 10/30 4 Arctic pack OA Ready in late March 4 Arctic pack OA Ready in late March 4 Arctic pack OA Ready in late March 4 Arctic pack OA Ready in late March 4 Arctic pack OA Ready in late March C NKALPN4OT C NKALPN4OT E 3ACD016DH C NKALPN4OT C NKALPN4OT C NKALPN4OT C ASGENR3GN C NKALPN4OT C NKALPN4OT C NKALPN4OT C NKALPN4OT E 3ACD016DH C NKALPN4OT C NKALPN4OT C NKALPN4OT C NKALPN4OT E 3ACD016DH E 3ACDO16DH E 3ACDO16DH E 3ACDO16DH E 3ACD016DH C NKALPN4OT C NKALPN4OT C NKALPN4OT E 3ACDO16DH E 3ACD016DH E 3ACD016DH E 3ACDO16DH E 3ACDO16DH 998W05 998W05 B00327 998W05 998W05 998W05 ASD003 3ACD016 998W01 998W02 998W02 B00327 998B15 998W01 998W01 998W02 B00327 B00327 B00327 B00327 B00327 998D01 998W05 998W05 B00329 B00329 B00329 B00329 B00329 * KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK. T=SCALE TREATMENTS, SP. EP. CP, OP, TP=PENDING WORK Poge 1 of 1 ~PHILLIPS Alaska, Inc. A Subsl~liary of PHILLIPS PETROLEI.~Vl COMPANY Steve Bradley Well Operations Supervisor Kuparuk Production NSK-69 Phone: 659-7348 Fax: 659-7314 February 19, 2001 Mr. Daniel Seamount, Chairman Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Dear Mr. Seamount: Attached is a listing of upcoming operations in the Kuparuk and Alpine Fields. This listing is provided as required under the terms If additional data or scheduling information is needed, please call. Sincerely, Well Operations Supervisor Attachments cc: File: F^R 021902, AIO 370 WWPL 3.14 Phillips Alaska. Inc. is a Subsidiary of Phillips Petroleum Company GREATER KUPARUK ENGINEERING WELL WORK PRIORI~ 2/19/01 4:36 PM Type DS WL BOPD PR StelWork Description Commente/Statue/Timing CosI Property [ Codt Charge Code AFC Cost Codes: C= Capital E= Expense SLICKUNE 1L -10 1 2U -12 800 2 1 D -129 300 3 3N-14 280,SE 4 1 1 B -13 225 5 lA -15 100 6 1 E -07 200 7 1F -20 200 8 1 2N -314 T 9 2N-337 A 250 10 2N -339 200 11 1D -113 180 12 2L-321 T, 150 13 3F -02 100 14 2W -06 100 15 2 2U -14 16 1 2W -13 T 17 2V -02 18 1 2W -10 19 3Q -21 i T 20 3R -25 i T 21 30 -19 I T 22 1D -37 300 23 1 lA -06 i 200 24 1 1R -01 B 110 25 1D -36 200 26 3G -05 150 27 1 1R -05 100 28 lB -O5 i A 29 1 3F -01 150 30 3G-14 A 135 31 2 3H -03 100 32 1R -20 100 33 3M -24 100 34 1 30 -04 100 35 2C -03 36 1 2M -13 37 3C -06 50 38 3N -07 100 39 1D -105 60 4O 1 2U -O4 41 1 lA -18 lA -19 lB -04 50 lB -05 25 2 1D -01 190 4 1D -32 200 1 1D -32 200 3 1D -32 200 5 1D -37 200 3 1D -37 200 5 1D -38 200 1 1D -38 200 3 1D -38 200 5 1D -39 200 1 1D -39 200 3 1D -39 200 5 1D -40 A 200 1 1 D -40 A 200 3 1 D -40 A 200 5 1 D -42 300 3 1 D -42 300 5 1 F -02 1 F -07 100 1F -20 284 2 1G -02 1 G -04 25 1G -07 Pre Rig Prep work Pull TTP's, run new GL design (ANN COMM) Pull and replace pump Tag & sample solids for rate / check GLVs D&T, Troubleshoot SSSV Open C34 Sand Close C sand; D&T DHST PBU Run DV Paraffin Cut Paraffin Cut Replace SOV Paraffin Cut Pull DH gauges, inspect pump Run Jet Pump Pre IPROF SL - tag/drift 72 Hour PBU Pre IPROF SL - tag/drift CV Check SBHP,state MIT State MIT Set TTP, MITT, Pull IBP for re-run Pull SOV and run DV Sep Zone A Sand SBHP Initial GLD Drift/Tag (rate loss > 1500 BOPD may be fill) Drift w/dummy pump, set DGLV @ 7648' Jet Pump Inspection and nzle up size; LO SSSV Pull BCP and run BPI in AVA Run jet pump & slip stop Drift and tag (post-FCO / pre-Video) Open C Sand Changeout DGLV in Prod'n mandrel Pull HES ret. Patch; D&T for peffs 72-hr PBU w/DHSIT & GLRD Pre IPROF SL - tag/drift 48 Hour PBU w/DHSIT Close C Sand for SZT 72-hr PBU NO DHSIT; set on collar/tbg stop Drift and Tag/Check SOV Pre Patch SL Close & Open C Sand for SZT PM CV's Open C sand Pull BPI and Run BPI w two 1/4" ports Run LGLV's; Pull Frac sleeve Pull SOV and run DV Dummy Gun run 20'x2.5" Post perf SBHP Dummy Gun run 20'x2.5" Post perf SBHP - ok to do with Eline after Peds Need Proc Pre Rig exp 2/24 Need GL design after weld job in progress Well plugged choke and stopped flowing 1/19 after inc. GL rate Choke flow with one 3/16" port in a BPI shuts off water Needed for Frac or development analysis - reserves at risk New Well. Ready Schedule in conjuction with DHD work -2/20/01 (Pete/Jerry). Ready Tag completed 1/28. Pump is still down. Schedule on 02/23, preparation for chemical squeeze Ready to pull after 01/31; gauges needed for 2W-06 Run one week after pressure bombs are set Ready Ready Ready Ready, do in conjunction with 2W-13 PBU Ready - SBHP stop depths sent via Email Ready (no SBHP required, well is not SI) READY -MITT failed, MITIA passed on 2/14. Facility ready Mar 3rd Inj SI for P reduction - Need before BOL (ready) Well dying off 260 Gross Oil Benefit ready 2.75" x 15' drift, verify ability to pull/set DGLV w/pkr set below mandrel erosional concerns BPC been in ground since 96 - erosional concerns Jet pump at Y-pad Potential C Sand eval for jet pump Leaking DGLV found in 1/13 log FP well & load backside for GL unloading later Eval damage, rate down 100 bopd; GLRD--Revised proc. Ready Ready reservoir surveillance Ready, evaluating skin for 4Q01 WO, corkscrewed tbg Trouble shoot pump, pre Eline leak detect log Ready Pull TPC/wait for 1 week (for SZT) / Rerun TPC asset preservation - erosion seen in past 9/99 Needed for WF mgmt 1-2 weeks after A sand is opened ready After FCO After peals After FCO After perfs Post Drill rig Replace SOV with DV (pre FCO/perf) no scafolding set on 2/11 Dummy Gun run 20'x2.5" After FCO Post perf SBHP After perfs Post Drilling work SCMT, Perf, and HPBD No scafolding 2/11- WWR out 2/12/01 Dummy Gun run 20'x2.5" After FCO Post perf SBHP After perfs Pull SOV and run DV ready Dummy Gun run 20'x2.5" After FCO Post perf SBHP After perfs Dummy Gun run 20'x2.5" After FCO Post perf SBHP After perfs Pull Replace sleeve Pending PWN Eval Tag/Close C Pull Gages & DHST 5 days after gages are set CV PM CV's in Ground since 4/99 Open C3,4 Sand Needed for EOR/MI management CV PM CV's in Ground since 2/99 E 230DS28UL K85329 E 25WSID6DL K85328 E 230DS36NL K85329 E 230DS10BL K85328 E 230DS10AL K85329 E 230DS10EL K85329 E 230DS10FL K85327 C 35TN2N8NG AKOO69 E 35TN2N8PF K85328 E 35TN2NSPF K85328 E 25WSID6DL K85328 E 35TN2L1PF K85328 E 230DS36FL K85328 E 230DS28WL K85327 E 230DS28UL K85327 E 230DS28WL K85327 E 230DS28VL K85327 E 230DS28WL K85329 E 230DS36QL K85329 E 230DS36RL K85329 E 230DS36OL K85329 C 230DS10DG AKO123 E 230DS10AL K85327 C 230DS10RG AKO086 E 230DS10DL K85329 C 230DS36GL ?????? E 230DSlORL K85329 E 230DS10BL K85329 E 230DS36FL K85328 E 230DS36GL K85329 E 230DS36HL K85329 E 230DS10RL K85329 E 230DS36ML K85328 E 230DS36OL K85327 E 230DS28CL K85327 E 230DS28ML K85327 E 230DS36HL K85327 E 230DS36NL K85327 E 25WS1D6DL K85329 E 230DS28UL K85329 E 230DS10AL K85327 E 230DS10AL K85328 E 230DS10BL K85329 E 230DS10BL K85329 E 230DS10DL 999545 C 230DS10DG AK0107 C 230DS10DG AK0107 C 230DS10DG AK0107 C 230DS10DG AK0123 C 230DS10DG AK0123 C 230DS10DG AKOO94 C 230DS10DG AKO094 C 230DS10DG AK0094 C 230DS10DG AK0121 C 230DS10DG AK0121 C 230DS10DG AK0121 C 230DS10DG AK0129 C 230DS10DG AK0129 C 230DS10DG AK0129 C 230DS10DG AK0105 C 230DS10DG AK0105 E 230DS10FL K85329 230DS10FL K85327 E 230DS10GL K85328 E 230DS10GL K85329 E 230DS10GL K85328 * KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Pekoe 1 of 4 GREATER I Type DS WL S 1G -15 S 1G -17 S 1H -02 S 1H -06 S 1H -O8 S 1H -11 S 1H -16 S 1 L -26 S 1 L -28 S 1R -09 S 1R -12 S 1 R -26 S 1Y-04 S 1Y -17 S 1Y -31 S 1Y -32 S 2A -15 S 2B -02 S 2B -03 S 2D -08 S 2H -04 S 2K -09 S 2M -17 S 2T -15 S 2Z -15 S 2Z -19 S 3A -05 S 3A -17 S 3B -14 S 3C -13 S 3G -05 S 3G -07 S 3H -01 S 3H -12 S 3H -18 S 3J -03 S 3J -06 S 3J -17 S 3K .23 S 3N -16 S 30 -16 S 3Q -02 S 3Q -10 SP 1D -06 SP 1E -21 SP 1F -01 SP 1F -16 SP 1H -01 SP lQ -15 SP 2A -11 SP 2B -07 SP 2B -10 SP 2B -10 SP 2C -04 SP 2C -13 SP 2M -30 SP 2M -31 SP 2T -209 SP 3B -05 SP 3B -07 SP 3F -05 SP 3F -15 SP 3H -01 SP 30 -10 SP 30 -12 KUPARUK ENGINEERING WELL WORK PRIORIJJ' / BOPD PR StelWork Description 50 150 600 1 200 100 50 150 A 25 20 50 A 2OO 75O 20O 100 20 Initial GLD Drift with Dummy Straddle Pull RHC c/o RP shear Run Plug and MI'FT SBHP (4 day SI needed) 1 D&T for Opportunity DEFT/PPROF SBHP (1 day SI needed) Tag (Pre FCO) Install GLD SBHP 2 CV Check C sand AVA PM Inspect CV's & AVA 4 Post Frac GLV's tag tt plug gage tubing Install GLD and tag 2 Open C Sand Install GLD Tag Fill 1 Close C sand SBHP on injector 1 New GLD Tag/Drift & MI Injection Profile Open C Sand / SBHP Erosion/scale CV check 2 Shut-In C Sand Lock Out SSSV Gauge & Tag 48-hr PBU Tag & PBU w/DHSIT 3 Pull DGLV @ 7648', run jet pump & tbg stop GLRD for rate 1 PDS multi-finger caliper Lock Out SSSV Troubleshoot injector tubing x 7" ann comm GLRD GLRD for maintenance GLRD Ddft for scale Gauge & Tag / Inspect Production CVs Memory IPROF (MI injection) Memory IPROF (MI injection) PBU w/DHSIT Lock Out SSSV CV PM 3 Continue Fishing (post-video log) Run tbg plug for Alt MIT I Post Rig WO work Tag & SBHP - GLD for A-sand production Close C sand MI Injection Profile Close C sand Tag & Gauge / MI IPROF Memory Log SBHP Opportunity Work MI Injection Profile MI Injection Profile Tag Fill PFO w/downhole gauges PFO w/downhole gauges Set Baker K-3 Packoff across hole in tubing MI Injection Profile 2 GLRD for rate Lock Out SSSV Memory IPROF E-LINE Comments/Status/Timing Ready 230DS10GL 230DS10GL Need Proc Post Rig will need SI ' 2/19/01 4:36 PM Cos/ Properly AFC Codt Charge Code E K85328 E K85235 E 230DS10HL K85329 E 230DS10HL K85327 E 230DS10HL K85327 Opportunity pressure E 230DS10HL K85327 Well appears to have hydrated off JT freezing effect across choke with current OV E 230DS10LL K85329 SI injector - Want to BOL after SBHP E 230DS10RL K85327 after scale hydroblast E 230DS10RL K85329 Choke sleeve in ground since 2/99 E 230DS10RL K85329 Last cv inspec 7/98 E 230DS10YL K85329 After FCO E 230DS10YL 999582 Eval ability to pull plug from TT - History of bad Csd scale E 230DS10YL K85329 ready E 230DS10YL K85328 After Water Flow Log E 230DS28AL K85329 Ready E 230DS28BL K85329 Ready E 230DS28BL K85329 Ready E 230DS28DL K85329 Ready, well is SI E 230DS28HL K85329 Ready E 230DS28KL K85329 On PWI. E 230DS28ML K85327 Ready E 230DS28TL K85329 Ready E 230DS28ZL K85329 1st. Attempt found Scale in well. CTU mill required. E 230DS28ZL K85329 Check with PE if well is ready. E 230DS36AL K85329 Ready; well acts plugged; think FP went away; need for pre-ML planning E 230DS36AL K85329 Opportunity pressure E 230DS36BL K85327 Opportunity pressure, last PBU done 5 yrs ago E 230DS36CL K85327 C 230DS36GL ?????? Well not on OV due to bad unloading valve. **Revised procedurei E 230DS36GL K85328 Determine extent of scale deposition for remedial action E 230DS36HL K85329 Cannot maintain pressure on hydraulic panel due to downhole leak E 230DS36HL K85329 Ready; not a wellhead problem E 230DS36HL K85329 Ready E 230DS36JL K85329 Big slugger, difficult to test well E 230DS36JL K85329 Ready E 230DS36JL K85329 Ready, rate down slightly; recent scale treatment E 230DS36KL K85329 Ready E 230DS36NL K85329 On MI now; gauge & tag probably needed E 230DS36OL K85327 On MI now; gauge & tag & set frac sleeve probably needed E 230DS36QL K85327 Ready; opportunity pressure E 230DS36QL K85327 Complete prior to RIH with any tools E 230DS10DL K85329 CV's in Ground since 2/98 SI w/Derated flowline 1/26/01 E 230DS10GL K85328 Pending Video, fishing tools E 230DS10FL K85329 E 230DS10FL K85329 Need Proc Post Rig exp 2/24 Has Ice plug E 230DS10QL K85329 On hold as C-sand is open & no lift gas required E 230DS28AL K85329 Ready E 230DS28BL K85329 On PWI. E 230DS28BL K85327 On hold per Mushovic/Dobson E 230DS28BL K85329 On PWl, Choke Well to 6000 MCFD for 7 Days Prior to Logging E 230DS28CL K85327 Ready after 9/24 E 230DS28CL K85327 On PWI, Evaluating injectivity and possible plugging damage E 230DS28ML K85327 On PWI,Evaluating tubing restrictions E 230DS28ML K85327 Do Work Next Time Pump is Down E 38TB2T6CL K85329 In conjunction w/pre-MI pressure reduction in spring 2001 E 230DS36BL K85327 In conjunction w/pre-MI pressure reduction in spring 2001 E 230DS36BL K85327 Waiting for -20 degrees to fill 7" annulus with cold diesel E 230DS36FL K85329 On water right now E 230DS36FL K85327 On hold pending scale determination E 230DS36HL K85329 Proceed after well wags from MI to water injection E 230DS36OL K85329 Need tag; well currently on water due to wellhead integrity prob. E 230DS36OL K85327 E 1Y -17 200 I 1 Perf A4 E 3F-21 i 2 1 SCMT (new injector) E 3J -09 i 3 IPROF (PWI - need 6585') E 3J -01 i 4 IPROF (PWI - need 9450') E 2L-317 A T 5 2 CBL/Perf/ISBHP E 3M -24 100 6 2 SBHP/CH GR/Add-perfs/SBHP/rerun patch E 1D-37 300 7 4 Perforate E 2U -14 8 2 PW IPROF E 2V -02 9 2 PW IPROF E 3G -05 150 10 2 Set Eclispe Pkr @ 7658', PTtbg for 30 min E 1D -42 300 11 4 Perforate post rig (Btm perf 8460) E 2C -03 12 2 PW IPROF Squeeze is leaking review with DSE E 230DS10YL 999582 Evaluate cement job for potential iso probs; timing w/surface work E 230DS36FO AKO 135 Ready - Tag'd @ 6685' on 2/14. Need data for core perm study. E 230DS36JL K85327 Tag'd @ 9524' on 2/14. Ready E 230DS36JL K85327 New Well. Ready. C 35TN2N8NG AKOO70 After SL prep E 230DS36ML K85328 After Dummy run C 230DS10DG AK0123 Ready E 230DS28UL K85327 Ready E 230DS28VL k85327 Pkr to be set 3' below production mandrel @ 7648'. C 230DS36GL ?????? After Dummy, Fac ready March 3 C 230DS10DG AK0105 Ready after SL tag/drift E 230DS28CL K85327 * KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 2 of 4 GREATER I TypeDS WL E 30 -19 E 1D -32 E 1D -38 E 1D -39 E 1D -40 E 1D -124 E 1Y -22 E 2U -04 E 1F -01 E 1H -11 E lQ -23 E 2X -01 E 3A -15 E 3F -21 E 3G -14 E 3J -16 E 30 -05 EP 1D -102 EP 1D -140 ENGINEERING WELL WORK PRIORI'~~~ KUPARUK / BOPD PR StelWork Description T 13 Re-run IBP for AOGCC MITT 200 14 4 CBL & Perforate 13804-13944 200 15 4 CBL and Peal 13955-14000 200 16 4 CBL and Peal A 200 17 4 CBL & Perforate 10900-10944' 18 FBHP/Temp Survey on a live ESP Opportunity PPROF / GLS 2 Settubing patch 200 2 Run Video Log of fish 2 Opportunity PPROF / GLS / DEFT 2 Opportunity PPROF / GLS PW IPROF i Opportunity IPROF (SWI) i 2 Peal New Injector & Initial SBHP A 135 3 Video Log (post FCO) i IPROF (Tag good- ok to log, PWI) i IPROF (SWI) FBHP/Temp Survey on a live ESP FBHP/Temp Survey on a live ESP CTU Comments/Status/Timing CosI Property CodI Charge Code After SL pulls previous IBP; bad set E After Dummy run revised depths C After Dummy run revised depths C Need Proc; Nabors 16E in the way C After Dummy run C Needed for ESP & heat-trace studies for upcoming development E Well currently SI/WL will need to ask to BOL- tagged 12/11 E Need pre patch SL work first E Attempt #3 - after FCO and SL work E after D &T E Tag 9333 12/9 will need FCO E Ready After Water Injection Restored/Flowline repairs undenNay E Well currently SI for pressure reduction; engineer will notify E Procedure pending SCMT results; probably after sudace work completed. E After FCO & tag; suspected casing damage E Tag'd @ 8611' on 2/4/01 - no FCO but want splits between A3/A2 E Currently on MI; should not need tag E Needed for ESP & heat-trace studies, waiting on metering E Needed for ESP & heat-trace studies, waiting on metering E 230DS36OL 230DS10DG 230DS10DG 230DS10DG 230DS10DG 25WS 1 D6EP 230DS 10YL 230DS28UL 230DS10FL 230DS10HL 230DS 10QL 230DS28XL 230DS36AL 230DS36FO 230DS36GL 230DS36JL 230DS36OL 25WS 1 D6EP 25WS1D6EP C C C C C C C C C C C C C C C C C C C C C CP CP CP 3J -07455 I Jet Ice/Mud in tbg, inj test, tag 3F -13A 280 2 Tag / FCO / Run Iso-Sleeve (C sand Shut-off) 1D -42300 4 2 FCO Drilling mud (pre perf) 2Z -19200 5 I Blast Tubing Scale 2C -15200 6 FCO 3G -14A 135 7 I FCO (fill in tubing, 12/22 tag) 2D -1375 8 I FCO 3H -11600 9 ECT Repair WO with Coil Platform 2F -1150 10 FCO 1F -01200 1 FCO fill from Fish and reverse out with filtered SW 1 F -18 100 FCO 1H -02600 2 Swap out Mud (9.7#) 1L-14 i 200 2 FCO? 1L-20 a 100 FCO lQ -23 50 1 FCO (pre PPROF) 1R -12 50 I Hydroblast Scale 1Y -17 200 3 FCO Frac 2K -09 FCO (foam) 2M -22 FCO (foam) 2T -31 FCO (foam) 3M -03 FCO 1H -01 750 2 Post Rig Mud CO 2D -03 75 1 Remove Coil Velocity String 3N -14 280 2 FCO pending tag higher than 7202' (btm perf) OTHER WORK 2/19/01 4:36PM AFC K85329 AKO107 AKO094 AK0121 AKO129 K85327 K85327 K85329 K85329 K85327 K85329 K85327 K85327 AKO135 K85329 K85327 K85327 K85327 K85327 FCO hydrate plug and BOL while still warm. E 230DS36JL K85329 FCO only if tag above 9150'. Pulled original sleeve on 1/10/01. E 230DS36FL K85329 after SL C 230DS10DG AKO105 Ready; take sample of scale for lab analysis E 230DS28ZL K85328 Ready E 230DS2CFL K85328 Well SI; producing rocks, frac & formation sand; Leave SI for video log E 230DS36GL K85328 Ready E 230DS28DL K85328 Timing unknown, need to be ready anytime E 230DS36HO 999556 Ready, Low BNP, Wait on 1.5" Coil E 230DS28FL K85328 Check w/PWS may have tree leak, May need to pump heavy fluid to get o~ E 230DS10FL K85329 Ready, Fill covering A sand perfs - also pre PPROF E 230DS10FL K85328 Need Proc Post Rig Tag 5674' 2/14 Ready, Fill covering A sand perfs - also pre PPROF E 230DS10LL 999437 E 230DS10LL K85328 E 230DS10QL K85329 E 230DS10RL K85329 E 230DS10YL 999582 E 230DS28KL K85328 E 230DS28ML K85328 E 230DS28TL K85328 E 230DS36ML K85328 E 230DS28DL K85328 E 230DS36NL K85328 O O O OP OP OP OP OP OP 3A -03A 1000 I Injectivitytest w/Sea Water (pre-stim design) 1Y-17 200 2 2 Pump Frac 1D -37200 3 6 Frac 1D-32 i 200 6 HPBD 1D-38 I 200 6 HPBD 1D-39 I 200 6 HPBD 1D-40 A 200 6 HPBD 1D -42 300 6 Frac 3H -17i 500 A- Sand HPBD CPFISCALETREATMENTS After Frac Ready, Can't pump SI Squeeze as 100% of Perfs covered Ready, Can't pump SI Squeeze as 100% of Peds covered Ready, Can't pump SI Squeeze as 100% of Perfs covered Tag'd fill over A1 sands @ 7805' on 1/20/01 Need Proc Pre Rig exp 2/24 Waiting for current coil tubing to "mile" out. suspect frac sand in tbg as done in 9/2000 after doubled GL rate new well with no inflow due to formation damage. After Perfs After SBHP, production hder ready 1st wk Mar Need Proc; After Injectivity test Need Proc; After Injectivity test Need Proc; Rig will uncover well -1/31/01 Need Proc; After Injectivity test Need Proc; After Production test Tried "poor boy" HPBD; review of results pending. T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1P T1P T1P 1D -04 1 D -08 1 L -08 lB -10 1L -23 1 E -20 1Y -27 lA -01 lA -19 1 R -07 1E -12 1Y -28 2Z -13 I SI-4004 Treatment C 2 SI-4004 Treatment 3 SI-4004 Treatment NC 4 SI-4004 Treatment NC 5 SI-4004 Treatment NC 6 SI-4004 Treatment 7 SI-4004 Treatment 8 SI-4004 Treatment NC 9 SI-4004 Treatment A/C 10 SI-4004 Treatment NC SI-4004 Treatment SI-4004 Treatment AJC SI-4004 Treatment CPF2 SCALE TREATMENTS SI-4004 SS-5206 PPM 8 1 Ready 12 6 I Ready 10 10 1 Ready 9 25 3 Ready 7 2 I Ready 8 24 2 Ready 7 10 1 Ready 7 20 2 Ready 8 25 3 Ready 6 6 1 Ready 6 18 2 Well SI 7 31 3 Hold until well is RTF; appmx 1~01 8 10 1 Hold until well is RTF 6 T2 2C -15 I SI-4004 Treatment T2 2V -16 2 SI-4004 Treatment T2 2T -23 3 SI-4004 Treatment SI-4004 SS-5206 PPM BBLS/DRUM 175200 172100 120300 117OOO 114400 113000 111000 109900 94200 51200 37800 118500 122800 BBLS/DRUM 14086 1O78OO 92000 C 230DS36AO AK0132 E 230DS10YL 999582 C 230DS10DG AK0123 C 230DS10DG AK0107 C 230DS10DG AK0094 C 230DS10DG AK0121 C 230DS10DG AK0129 C 230DS10DG AK0105 E 230DS36HG 999438 E 230DS10DL K85328 E 230DS10DL K85328 E 230DS10LL K85328 E 230DS10BL K85328 E 230DS10LL K85328 E 230DS10EL K85328 E 230DS10YL K85328 E 230DS10AL K85328 E 230DS10AL K85328 E 230DS10RL K85328 E 230DS10EL K85328 E 230DS10YL K85328 E 230DS28ZL K85328 E 230DS28ZL K85328 E 230DS28VL K85328 E 230DS28TL K85328 2 1 Ready;frac complete, A-sandisolated 14 38 4 Ready 6 2 I Ready 5 * KEY; S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 3 of 4 GREATER I Type KUPARUK ENGINEERING WELL WORK PRIOR~ DS WL BOPD PR StelWork Description T2 2C -14 4 SI-4004 Treatment T2 2D -01 5 SI-4004 Treatment T2 2M -10 6 SI-4004 Treatment T2 2T -21 7 SI-4004 Treatment T2 2C -16 St-4004 Treatment T2 2M -13 SI-4004 Treatment T2 2M -32 SI-4004 Treatment T2P 2K -09 2 SI-4004 Treatment- A sd T2P 2T -37 2 SI-4004 Treatment NC CPF3 SCALE TREATMENTS Comments/Status/Timing 2 I Ready 6 I Ready 4 I Ready 5 I Ready 25 3 Ready 2 I Ready 2 I Ready 2 I Post FCO;lasta~emptfailed 3 I Post Gauge & Tag 6 12020O 7 1143OO 6 57780 6 1962O0 6 89600 6 71900 6 79700 5 86300 7 115200 SI-4004 SS-5206 T3 3K -03 1 SI-4004 Treatment 2 T3P 3H -01 SI-4004 Treatment - C only 13 Sum of Scale Treatments SI-4004 bbls= 303 PPM BBLS/DRUM I Ready 10 I A sand producing, check residuals 1st. P~ 7 41 =bbls SS-5206 77,800 36,400 2/19/01 4:36 PM CosI Property AFC Codl Charge Code E 230DS28CL K85328 E 230DS28DL K85328 E 230DS28ML K85328 E 230DS28TL K85328 E 230DS28CL K85328 E 230DS28ML K85328 E 230DS28ML K85328 E 230DS28KL K85328 E 230DS28TL K85328 E 230DS36KL K85328 E 230DS36HL K85328 * KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK pc~ge 4 of 4 GREATER KUPARUK ENGINEERING WELL WORK .;T 2/19101 12:57 PM I Ty'pe DS WL NOB PR Step Work Description Comments/Status/Timing Cost Property AFC Code Charge Code Cost Codes: C= Capital E= Expense SLICKLINE S CD1 -21 1 Post rig prep - GLV, SBHP, SSSV Waiting on dg move, ready after 2/15 S CD1 -17 2 Pull SPM gauges poststartup Ready after 12/15 S CD1 -04 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -10 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -22 A 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -24 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -25 3 Run SPM gauges prestartup Ready after 10/30 S CD1 -27 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -34 3 Pull SPM gauges poststartup Ready after 12/15 S WD -02 3 Caliper Survey Annual MIT S WD -02 3 SSSV, drift, tag Annual MIT S WD -02 3 SSSV post MIT Annual MIT S Alp -01 A 4 Prep for observation gauges Ready after 3/1/2001 S Berg -02 A 4 Pull gauges for pulse test Ready after 3/1/2001 S Berg -02 A 4 Prep for observation gauges Ready after 3/1/2001 E-LINE E CD1 -21 1 SCMT Pending rig move 2/15 E CD1 -26 2 WFL Combo with SCMT jobs E WD -02 3 WFL and Temp Survey Annual MIT E Alp -01 A 4 Run observation gauges Ready after 3/1/2001 E Alp -01 A 4 Clean out for obs gauges Ready after 3/1/2001 E Berg -02 A 4 Run observation gauges Ready after 3/1/2001 CTU C CD1 -38 1 Memory spinner log Ready after 2/1 C CD1 -40 1 Memory spinner log Ready after 2/1 C CD1 -41 1 Memory spinner log Ready after 2/1 C CD1 -43 1 Memory spinner log Ready after 2/1 C CD1 -44 1 Memory spinner log Ready after 2/1 OTHER WORK O CD1 -21 3 Flowback injection well prestartup Ready after 1/29 O CD1 -16 4 Flowback injection well prestartup Ready after 10/30 O CD1 -23 4 FIowback injection well prestartup Ready after 10/30 C NKALPN4OT 998D01 C NKALPN4OT 998W05 O NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 3ACD016 C NKALPN4OT 3ACD016 C NKALPN4OT 3ACD016 C NKALPN4OT 998W01 C NKALPN4OT 998W02 C NKALPN4OT 998W02 C NKALPN4OT 998D01 O NKALPN4OT 998B15 O NKALPN4OT 3ACD016 C NKALPN4OT 998W01 C NKALPN4OT 998W01 C NKALPN4OT 998W02 E NKALPN4OT 3ACD016 E NKALPN4OT 3AOD016 E NKALPN4OT 3ACD016 E NKALPN4OT 3ACD016 E NKALPN4OT 3ACD016 C NKALPN4OT 998D01 O NKALPN4OT 998W05 O NKALPN4OT 998W05 * KEY; S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 1 of 1 ~PHILLIPS Amska, Inc. A Subsidtau7 et PHILLIPS PETROLEUM COMPANY Steve Bradley Well Operations Supervisor Kuparuk Production NSK-69 Phone: 659-7348 Fax: 659-7314 February 27, 2001 Mr. Daniel Seamount, Chairman Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Dear Mr. Seamount: Attached is a listing of upcoming operations in the Kuparuk and Alpine Fields. This listing is provided as required under the terms of~~'~/~ii!~.~': If additional data or scheduling information is needed, please call. Sincerely, Steve Bradley Well Operations Supervisor Attachments cc: File: FAR 022702, ATe 370 WWPL 3.14 RECEIVED Naska 0il & Gas Cons. commission Anchorage Phillips Alaska. Inc. is a Subsidiary of Phillips Petroleum Company GREATER KUPARUK ~NGINEERING WELL WORK PRIORITY LIST ICorn m ent.~/St alu s71'lm in g cCc~ Pr°PartY Charge Coda IAFC Cost C= Capital E= Expens~ 2/271QI 351 PM SLICKLINE 2U -12 8OO 1 1H-O2 6O0 2 1H-O2 600 3 3 1D-40A 200 4 1 1H -01 750 $ 1 2V -14 300 6 1D-40A 200 7 2 1D -38 I 200 8 1 2N -3414509 2L -30740010 1L -09 11 1F -20 28412 1D -37200 13 1 2N -336 200 14 2N -316 A. 250 15 2Z -O7200 16 1 2N-337 A 250 17 1D -36200 18 2L -326 A, 200 19 1D -113 180 2O 1D -32 20021 1 2Z -07 20022 4 3F -02 10023 1D -32 20024 2 2U -14 25 1 1D -38 20026 2 2W -13 T 27 1D -39 20028 1 3F -15 29 30 -16 30 lA -16 10031 2V -02 32 1 2W -10 33 3Q -21T 34 3R -25T 35 30 -19T 36 1 1R-01 B 11037 3G -05150 38 1 3F -01150 39 3G-14A 135402 1R -05 10041 16 -05 A 42 1 3H -O3 10043 1R -20 10044 3M -24 10045 1 30 -O4 10046 2C -03 47 1 2M -13 48 3C -06 50 49 3N -O7 1005O lA -16 lA -19 1 B -0450 16 -05 25 2 1D -32 200 1D -38 200 1D -39 200 1D -40 A 200 1D -10560 1 1 F -02 1F -07 100 1G -02 1G -04 25 1 G -07 1G -15 50 1G -17 150 1H -06 1H -08 1H -11 1 1H -16 1L -10 1L -26 1 L -2825 1 R -0950 1R -12 2 Paraffin Cut and Tag Fill Paraffin Cut and Tag Fill Pre Rig SL Pull Gages & DHSIT Post pad SBHP Paraffin Cut and Tag Fill Tag Fill Pre Frac Sllckllne Paraffin Cut Ddft/'rag (rate loss > 1500 BOPD may be fill) Tag Fill Pull Pump Pull SOV and mn DV Post Frac GLD Pull DH gauges, inspect pump Dummy Gun mn 20'x2.5' Pre IPROF SL - tag/drift Dummy Gun mn 20'x2.5' 72 Hour PBU Dummy Gun mn 20'x2.5" MI Injection Profile Memory IPROF (MI Injection) Open C34 Sand Pre IPROF SL - tag/drift CV Check SBHP,state MIT State MIT Set '1-rP, MITT, Pull IBP for re-mn Initial GLD Drift w/dummy pump. set DGLV @ 7648' Run Jet pump & slip stop Drift and tag (post-FCO / pre-Video) Pull TTP's. mn new GL design (ANN COMM) Need GL design; 2nd weld complete 02/'25 Pull RHC. cio RP shear Need Proc Post Rig Measure A sand pressure 2 days after FCO need Proc Pull SOY and mn DV Post Rig Post Rig we work Need Proc Post Rig (expect lobe reedy 2/26) Open C.sands Open sliding sleeve Dummy Gun run 20'x2,5' FCO'd to 11046 2/17 post rig Post Drill dg Replace SOY with DV (pre FCO/ped) no scafolding set on 2/11 post dg Ready Schedule for 2/28/01 in prep for Baker Chemical treatment Need Proc Run 2/22, SI at 0400 2/23. Pull on 2/26. After pads (post fig) Ready Fill problems anticipated. Remove CAT standing valve & set sand plug accross A-sands Schedule In conjuctlon with DHD work (Peta/JerlT). ready Fill problems anticipated. Pump could not be revived. (post rig) Run GLD prior to POP Ready to pull after 01/31; gauges needed for 2W-06 FCO'd to 14083 2/17 Ready FCO'd to 14252 2/16 Ready FCO'd to 13490 2/15 On MI On MI now; gauge & tag probably needed Choke flow with one 3/16" port In a BPI Ready Ready, do in conjunction with 2W-13 PBU Ready - SBHP stop depths sent via Email Ready (no SBHP required, well is not SI) READY -MITT tailed, MITIA passed on 2/14. Well dying off-260 Gross Oil Benefit 2.75' x 15' drift, vedfy ability to pull/set DGLV w/pkr set below mandrel Jet pump at Y-pad Jet Pump Inspection and nzle up size; LO SSSV erosional concerns Pull BCP and run BPI in AVA BPC been In ground since 96- erosional concerns Open C Sand Potential C Sand eval for Jet pump Changeout DGLV In Prod'n mandrel Leaking DGLV found in 1/13 log Pull HES ret. Patch; D&T for peris FP well & load backside for GL unloading later 72-hr PBU w/DHSIT & GLRD Eval damage, rate down 100 bopd; GLRD--Revlsed proc. Pre IPROF SL - tag/driff Ready 48 Hour PBU w/DHSIT Ready Close C Sand for sz'r reservoir surveillance 72-hr PBU NO DHSIT; set on collar/tbg stop Ready, evaluating skin for 4Q01 we. corkscrewed tbg Close & Open C Sand for SZT Puli TPC/wait for 1 week (for SZT) / Reran TPC PM CV's asset preservation - erosion seen In past 9/99 Open C sand Needed for WF mgmt Pull BPI and Run BPi w two 1/4' ports 1-2 weeks after A sand is opened Post pg..'/. ~ After peris 1~ After pelfs Pact pcd~,BHl~ Alter parts l:~o~f pad ~ After peris Drift and Tag/Check SOV Trouble shoot pump. pre Eline leak detect log Pull Replace sleeve Pending PWN Eval Tag/Close C need proc CV PM CV's in Ground since 4/99 Open C3,4 Sand Needed for EOR/MI management CV PM CV's in Ground since2/99 Initial GLD Ready Drift with Dummy Straddle Run Plug and MITT SBHP (4 day SI needed) will need SI D&T for Opportunity DEFT/PPROF SBHP (1 day SI needed) Opportunity pressure Post Rig work Need Proc Expect completion - 3/9 Tag (Pre FCO) Well appears to have hydrated off Install GLD JT freezing effect across choke with current OV SBHP SI injector - Want to BOL after SBHP CV Check after scale hydreblast E 230DS28ULK85329 C 23ODS10HGAK0140 C 23ODSlOHGAK0140 C 23ODS10DGAK0129 C 230DS10HGAK0142 E 230DS28VLK85236 C 23ODS10DGAK0129 C 23ODS10DGAK0094 E 35TN2N8PFK85328 E 35TN2L1PFK85328 C 23ODS10LGAK0141 E 23ODS10FLK85327 C 230DS10DGAK0123 E 35TN2NSPFK85328 E 35TN2N8NLK85329 C 23ODS28ZL999566 E 35TN2N8PFK85328 E 230DS10DLK85329 E 35TN2L1LLK85329 E 25WS1D6DLK85328 C 230DS10DGAK0107 C 230DS28ZL999566 E 230DS36FLK85328 C 230DS10DGAK0107 E 230DS28ULK85327 C 230DS10DGAK0094 E 230DS28WLK85327 C 230DS10DGAK0121 E 230DS36FLK85327 E 230DS36OLK85327 E 230DS10ALK85329 E 230DS28VLK85327 E 230DS28WLK85329 E 230DS36QLK85329 E 230DS36RLK85329 E 230DS36OLK85329 C 230DS10RGAK0086 E 230DS36GLK85328 E 230DS36FLK85328 E 230DS36GLK85329 E 230DS10RLK85329 E 230DS10BLK85329 E 230DS36HLK85329 E 230DS10RLK85329 E 230DS36MLK85328 E 230DS36OLK85327 E 230DS28CLK85327 E 230DS28MLK85327 E 230DS36HLK85327 E 230DS36NLK85327 E 230DS10ALK85327 E 230DS10ALK85328 E 230DS10BLK85329 E 230DS10BLK85329 C 230DS10DGAK0107 C 230DS10DGAK0094 C 230DS10DGAK0121 C 230DS10DGAK0129 E 25WS1D6DLK85329 E 230DS10FLK85329 E 230DS10FLK85329 E 230DS10GLK85328 E 230DS10GLK85329 E 230DS10GLK85328 E 230DS10GLK85328 E 230DS10GLK85235 E 230DS10HLK85329 E 230DS10HLK85327 E 230DS10HLK85327 E 23ODS10HLK85327 C 230DS10LGAK0143 E 230DS10LLK85328 E 230DS10LLK85329 E 230DS10RLK85327 E 230DS10RLK85329 · KEY; S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 1 of 3 GREATER KUPARUK ENGINEERING WELL WORK PRIORITY LIST S 1R -13 S 1Y-O4 S 1Y -17 S 1Y -31 S 1Y -32 S 2A -15 S 2B -O2 S 2B S 2D ~8 S 2H -04 S 2H -O9 S 2H -O9 S 2K -09 S 2M -17 S 2T -15 S 2U -04 S 2Z -15 S 2Z -19 S 3A .05 S 3A -17 S 3B -14 S 3C -13 S 3G S 3G -O7 S 3H -01 S 3H -12 S 3H -16 S 3J -03 S 3J~6 S 3J -17 S 3K -23 S 3M -01 S 3N -16 S 3Q -10 SP 1D -O6 SP 1E -20 SP 1E -21 SP 1F-01 SP 1F -16 SP 1L -O9 SP lQ -15 SP 1R -26 SP 2A -11 SP 2B -07 SP 2B -10 SP 2B -10 SP 2C -O4 SP 2C -13 SP 2L -315 SP 2M -30 SP 2M -31 SP 2T -209 SP 3B -05 SP 3B -07 SP 3F -05 SP 3H -01 SP 30 -10 SP 30 -12 SP 3Q -02 150 A 25 20 E-LINE Comments/St slue/Timing Drill/Tag Collect Sample Inspect CV's & AVA 200 4Post Frac GLV's 100 tag tt plug gage tubing 50 Install GLD and tag 2Open C Sand 25 Install GLD Tag Fill 1Close C sand 0 SBHP on Injector 180 1Pre Frac Slickline 180 4Post Frac GLD 30 1New GLD Tag/Drift & MI Injection Profile Open C Sand / SBHP 150 1Pre Patch SL Erosion/scale CV check Shut-In C Sand Lock Out SSSV Gauge & Tag 48-hr PBU Tag & PBU w/DHSIT 3 Pull DGLV @ 7648', run jet pump & tbg stop GLRD for rate 1PDS multi-finger caliper Lock Out SSSV Troubleshoot Injector tubing x 7*ann corem GLRD GLRD for maintenance GLRD 50 Drift for scale 50 1 Gauge & Tag; dummy gun run Gauge & Tag / Inspect Production CVs PBU w/DHSIT Lock Out SSSV Run Gas Lift Design CV PM 200 3 Continue Fishing (post-video log) Run tbg plug for Alt MIT 3 Post Rig work Tag & SBHP - C sand AVA PM 200 GLD for A-sand production Close C sand MI Injection Profile Close C sand Tag & Gauge / MI IPROF Memory Log SBHP Opportunity Work 500 Paraffin Cut and Tag fill MI Injection Profile MI Injection Profile Tag Fill PFO w/downhole gauges PFO w/downhole gauges 100 Set Baker K-3 Packoff across hole In tubing 20 2 GLRD for rate I Lock Out SSSV I Memory IPROF Memory IPROF (MI injection) 1Y-17 2001 I PedA4 3J -09 i 3 IPROF (PWI - need 6585') 3J -ol i 4 IPROF (PWI - need 9450') 2L-317 A T 5 2 CBL/Perf/ISBHP 3F -21 6 2 SCMT; need pressure & no-pressure passes 3M -24 1007 2 SBHP/CH GR/Add.perls/SBHP/rorun patch 2U -14 8 2 PW IPROF 2V -02 9 2 PW IPROF 3G -05 15010 2 Sat Ecllspe Pkr @ 7658', PT tbg for 30 rain 2C -03 11 2 PW IPROF 30 -19 T 12 2 Re-run IBP for AOGCC MI3-1' 1D -32 20013 3 CBL & Pedorate 13804-13944, SBHP 1D -38 20014 3 CBL and Per/13955-14000, SBHP 1D -40 A 20015 3 CBL & Perforate 10900-10944', SBHP 1D -135 16 FBHP/Temp Survey on a live ESR 1D -124 17 FBHP/Temp Survey on a live ESP 1D -39 I 20018 2 CBL and Pert, SBHP 3M -01 50 19 2 Initial per/of C Sands 3G -14 A 13520 3 Video Log (post FCO) 1Y -22 Opportunity PPROF / GLS 2U -04 2 Set tubing patch 1F -01 200 2 Run Video Log of fish 1H -11 2 Opportunity PPROF / GLS / DEFT lQ -23 2 Opportunity PPROF / GLS 23( -01 PW IPROF Prep for possible stimulation (poss 200 NOB for A sand support) Last cv inspec7FJ8 After FCO Eval ability to pull plug lrom 'Ir - History of bad Csd scale After Water Flow Log Ready Ready Ready. well is SI Ready Run pdor to POP Ready On PWI. Ready Ready Ready Ready - CTU mill ocmplete. Check with PE if well is ready, Ready; well acts plugged; think FP went away; need for pre-ML planning Opportunity pressure Opportunity pressure, last PBU done 5 yrs ago Well not on OV due to bad unloading valve,**Revlsed procedurel Determine extent of scale deposition for remedial action Cannot maintain pressure on hydraulic panel due to downhole leak Ready; not a wellhead problem Ready Big slugger, difficult to test well Ready Ready, rate down slightly; recent scale treatment Pro-C Sand perts Ready Ready; opportunity pressure Complete prior to RIH with any tools Need Proc;walt results of scale treat CV's In Ground since2/98 SI w/Derated flowllne 1/26/01 Pending Video, fishing tools Need Proc Expect completion - 3/16 Has Ice plug Last PM 2/99, pending DSE decision on SI c sand On hold as C-sand is open & no lift gas required Ready On PWI. On hold per Mushovic/Dobson On PWl, Choke Well to 6000 MCFD for 7 Days Prior to Logging Ready after 9/24 Schedule -3/7 In prep for Baker chemical treatment. On PWI, Evaluating InJectivIty and possible plugging damage On PWI,Evaluating tubing restrictions Do Work Next Time Pump is Down In conjunction w/pro-MI pressure reduction In spring 2001 In conjunction w/pro-Mi pressure reduction In spring 2001 Waiting for -20 degrees to fill 7" annulus with cold diesel On hold pending scale determination Proceed after well wags from MI to water injection Need tag; well currently on water due to wellhead Integrity prob. On water now; gauge & tag & set frac sleeve probably needed pro froc Ready - Tag'd @ 6685' on 2/14. Need data for core perm study, Tag'd @ 9524' on 2/14. Ready New Well, Ready, Post underream cleanout; use 01/27 procedure again After SL prep Ready Ready Pkr to be set 3' below production mandrel @ 7648', Ready after SL tag/drift After SL pulls previous IBP; bad set After Dummy run revised depths Alter Dummy run revised depths Alter Dummy run Well is already equipped with gas meter, ready. Needed for ESP& heat-trace studies for upcoming development Need Proc After D & T After FCO & tag; suspected casing damage Well currently SI/WL will need to ask to BOL- tagged 12/11 Need pre patch SL work first Attempt #3 - after FCO and SL work after D &T Tag 9333 12/9 will need FCO Ready After Water Injection Restorod/Flowline repairs underway Cos{ Properly I CodlCharge Code ]AFC E 23ODS10RL K85329 E 23ODS10YLK85329 E 23ODS10YL999582 E 23ODSIOYLK85329 E 23ODS10YLK85328 E 23ODS28ALK85329 E 23ODS28BLK85329 E 230DS28BLK85329 E 23ODS28DLK85329 E 23ODS28HLK85329 C 23ODS28HO999561 C 23ODS28HO999561 E 23ODS28KLK85329 E 230DS28MLK85327 E 23ODS28TLK86329 E 23ODS28ULK85329 E 23ODS28ZLK85329 E 23ODS28ZLK85329 E 230DS36ALK85329 E 23ODS36ALK85329 E 23ODS36BLK85327 E 23ODS36CLK85327 E 230DS36GLK85328 E 23ODS36GLK85328 E 23ODS36HLK85329 E 23ODS36HLK85329 E 230DS36HLK85329 E 230DS36JLK85329 E 230DS36JLK85329 E 230DS36JLK85329 E 230DS36KLK85329 E 230DS36MLK85328 E 23ODS36NLK85329 E 230DS36QLK85327 E 23ODS10DLK85329 E 230DS10ELK85328 E 230DS10GLK85328 E 23ODSIOFLK85329 E 23ODS10FLK85329 C 230DS10LGAK0141 E 230DS10QLK85329 E 230DS10RLK85329 E 230DS28ALK85329 E 23ODS28BLK85329 E 23ODS28BLK85327 E 23ODS28BLK85329 E 230DS28CLK85327 E 230DS28CLK85327 E 35TN2L1PFK85328 E 230DS28MLK85327 E 230DS28MLK85327 E 38TB2T6CLK85329 E 230DS36BLK85327 E 230DS36BLK85327 E23ODS36FLK85329 E230DS36HLK85329 E23ODS36OLK85329 E230DS36OLK85327 E230DS36QLK85327 E 230DS10YL999582 E 230DS36JLK85327 E 230DS36JLK85327 C 35TN2N6NGAK0070 C 230DS36FOAK0135 E 230DS36MLK85328 E 230DS28ULK85327 E 230DS28VLk85327 E 230DS36GLK85328 E 23ODS28CLK85327 E 230DS36OLK85329 C 23ODS10DGAK0107 C 23ODSlODGAK0094 C 23ODS10DGAK0129 E 25WS1D6EPK85327 C 230DS10DGAK0121 E 230DS36MLK85328 E 230DS36GLK85329 E 230DSlOYLK85327 E 230DS28ULK85329 E 230DS10FLK85329 E 23ODS10HLK85327 E 230DS10QLK85329 E 230DS28XLK85327 * KEY; S=$LICKLINE, E=E.LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, ER, CR, OR, TP=PENDING WORK Poge 2 of 3 GREATER KUPARUK ~'NGINEERING WELL WORK PRIORITY LIST ~ 3A -15 E ~ -16 EP 1D -102 EP 1D -140 EP 3F -21 EP 30 ~5 CTU C 1H -01 C 1H-O2 C 3F -21 C 2Z -O7 C 3N -14 C 3F -13 C 2H -09 C 3G -14 C 2D -13 C 1F -01 C 1F -18 C 1L -10 C 1L -14 C 1L -20 C lQ -23 C 1R -12 C 1Y -17 C 2M -22 C 2T -31 C 3H -11 C 3M -03 CP 2D -03 CP 3J -07 Comments.~St atus/Tlmlng Opporlunify IPROF (SWl) Well currently SI for pressure reduction; engineer will notify IPROF (Tag good- ok to lng, PWl) Tag'd ~ 8611' o~ 2/4/01 - no Fca bul want splits between A3/A2 FBHP/Temp Survey on a llve ESP Needed for ESP & heat-trace studies, waiting on matedng FBHP/Temp Survey on a live ESP Needed Ior ESP & baal-trace studies, waiting on metedng 3 Pert New Injector & (nifial SBHP Procedure pending SCMT results; probably after surface work completed. C 23ODS36FO IPROF (SWI) Currently on MI; should not need tag E 23ODS36OL 750 I 2 Post Rig Mud CO 600 2 2 Swap out Mud (9.7#) 3 1Underreem/cleenout for SCMT 200 4 3Post Frac Fca 280 5 Fca Ifil A 280 6 Tag / Fca / Run Isa-Sleeve (C sand Shut-oft) 180 7 3Post Frac Fca A 135 8 1Fca (fill in tubing. 12/22 tag) 75 9 1Fca Need Proc Post Rig (expect robe ready 2/26) Post Rig Surf work -3/1; suspect green cmt in csg; agreed procedure not needed Fca of C-sand only Excellent pressure suppo~l: need t/production & scale treatment Fca only if tag above 9150'. Pulled original sleeve on 1/10/01. Fca after frac Well SI; producing rocks, frac & formation sand; Leave SI fowldeo log Reedy 200 10 1 FC~fi~fr~mFishandreverse~utwithfi~teredSWcheckw/PWSmayhavetree~eak~Mayneedt~pumpheaWf~uIdt~get~n~ E 100 Fca Post Rig work 200 FCa/mill cmt in tubing 100 Fca 50 1 Fca (pre PPROF) 50 1 Hydroblast Scale 200 3 Fca Fmc Fca (foam) Fca (foam) 600 ECT Repair wa with Coil Plaftorm Fca 75 1 Remove Coil Velocity String 455 Fca in prep for wa/ST OTHER WORK 200 I 2 C-sand Fmc 2 2Pre Rig Sand Plug 200 3 2Pump Frac 200 4 2Frac 180 5 2C-sand Frac 2Z -07 1 L -09 1Y -17 1D -37 2H -09 2L -307 2N -326 1 D -32 1D -38 1D -39 1D -4O 1 D -42 2L -315 3H -17 400 6 PAO23 & PEP1 Treatment 500 7 PAO23 & PEP1 Treatment i 200 4 HPBD I 200 5 HPBD I 200 3 HPBD A 200 5 HPBD 300 Frac 500 PAO23 & PEP1 Treatment i 500 A- Sand HPBD CPF1SCALETREATMENTS Ready, Fill covedng A sand pads - also pre PPROF Need Proc Expect completion ~ 3/9 Tag 5674' 2/14 Ready, Fill covering A sand parts - also pre PPROF T1 1E -20 T1 1L -23 T1 1Y -27 TI lA -01 T1 lA -19 T1 1R -O7 T1P 1E -12 T1P 1Y -28 T1P 2Z -13 After Frac Ready, Can't pump SI Squeeze as 100% of Parts covered Ready, Can't pump SI Squeeze as 100% of Parts covered Timing unknown, need to be ready anytime Tag'd fill over A1 sands @ 7805' on 1/20/01 Waiting for current coil tubing to 'mile' out. Fill found to 1463' MD; waiting on ST plan to procede Ready Need Proc After Perls After SBHP, production hder ready 1st wk Mar Ready Schedule -3/2 following paraffin scrape Schedule -2/28 following paraffin scrape Need Proc; After InJectlvlty test Need Proc; After InJoctlvlty test Need Proc Need Proc; After Inlectlvlty test Need Proc; After Production test Schedule -3/9 following paraffin scrape Tried "poor boy" HPBD; still reviewing results per DSE 2/19/01. SI-4004 SS-5206 PPM BBLSIDRUM SI-4004 Treatment 24 2 Ready 7 113000 SI.4004 Treatment A/C 2 1 Ready 8 114400 SI-4004 Treatment 10 1 Ready 7 111000 SI-4004 Treatment A/C 20 2 Ready 8 109900 SI-4004 Treatment A/C 25 3 Ready 6 94200 SI-4004 Treatment A/C 6 1 Ready 6 51200 SI-4004 Treatment 18 2 Well SI 7 37800 Sl-4004 Treatment A/C 31 3 Hold until well Is RTF; approx 10/01 8 118500 SI-4004 Treatment 10 I Hold until well is RTF 6 122800 cC;Property Charge Code AFC E 23ODS36ALK85327 E 23ODS36JLK85327 E 25WSlD6EP1(85327 E25WS1D6EPK85327 AKO 135 K85327 CPF2SCALETREATMENTS T2 2T -23 T2 2C -14 T2 2D -01 T2 2M -10 T2 2T -21 T2 2C -16 T2 2K -09 T2 2M -13 T2 2M -32 T2P2'I' -37 SI-4004 SS-8206 PPM BBLS/DRUM SI-4004 Treatment SI-4004 Treatment SI.4004 Treatment Sl-4004 Treatment SI-4004 Treatment SI-4004 Treatment 2 Sl-4004 Treatment - A sd Sl-4004 Treatment Sl-4004 Treatment 2 Sl.4004Treatment A/C CPF3 SCALE TREATMENTS 2 1 Ready 5 92000 2 1 Ready 6 120200 6 1 Ready 7 114300 4 1 Ready 6 57780 5 1 Ready 6 196200 25 3 Ready 6 89600 2 1 Ready; Fca complete 02~0 5 86300 2 I Ready 6 71900 2 1 Ready 6 79700 3 1 Post Gauge & Tag 7 115200 S1-.4004 SS-5206 PPM BBLS/DRUM 1 A sand producing, check residuals 1st. I 29 =bbls SS-5206 T3 I blank entry for sorllng T3P 3H -01 2 SI-4004 Treatment - C only 13 Sum of Scale Treatments Sl-4004 bbls= 212 C 23ODS10HGAK0142 C 23ODSlOHGAK0140 C 23ODS36FOAK0135 C 23ODS28ZL999566 E 23ODS36NLK85328 E 230DS36FLK85329 C 23ODS28HO999561 E 23ODS36GLK85328 E 23ODS28DLK85328 23ODS10FLK85329 E 23ODS10FLK85328 C 23ODS10LGAK0143 E 230DS10LL999437 E 230DSlOLLK85328 E 230DSlOQLK85329 E 230DS10RLK85329 E 230DS10YL999582 E 230DS28MLK85328 E 230DS28TLK85328 E 230DS36HO999556 E 230DS36MLK85328 E 230DS28DLK85328 E 230DS36JLK85329 C 230DS28ZL999566 C 230DS10LGAK0141 E 230DS10YL999582 C 230DS10DGAK0123 C 230DS28HO999561 E 35TN2L1PFK85328 E 35TN2L1PFK85328 C 230DS10DGAK0107 C 230DS10DGAKO094 C 230DS10DGAK0121 C 230DS10DGAK0129 C 230DS10DGAK0105 E 35TN2LIPFK85328 E 230DS36HG999438 E230DS10ELK85328 E230DS10LLK85328 E230DS10YLK85328 E230DS10ALK85328 E230DS10ALK85328 E230DS10RLK85328 E230DS10ELK85328 E230DS10YLK85328 E230DS28ZLK85328 E 230DS28TLK85328 E 230DS28CLK85328 E230DS28DLK85328 E230DS28MLK85328 E230DS28TLK85328 E230DS28CLK85328 E230DS28KLK85328 E230DS28MLK85328 E230DS28MLK85328 E230DS28TLK85328 7 36,400 E 230DS36HLK85328 2/27/QI 3:51 PM KEY: S=SLICKLINE, E=E.LINE, C=CTU, O=OTHER WORK, T=SCAI E TREATMENTS, SP, El=, CP, OP, TP=PENDING WORK Page 3 of 3 2/27/01 3:52 PM I Type DS WL NOB PR Step Work Description Comments/Status/Timing Cost Property AFC Code Charge Code Cost Codes: C= Capital E= Expense SLICKLINE S CD1 -21 1 Post rig prep - GLV, SBHP, SSSV Waiting on rig move, ready after 2/15 S CD1 -17 2 Pull SPM gauges poststartup Ready after 12/15 S CD1 -04 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -10 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -22 A 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -24 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -25 3 Run SPM gauges prestartup Ready after 10/30 S CD1 -27 3 Pull SPM gauges poststartup Ready after 12/15 S CD1 -34 3 Pull SPM gauges poststartup Ready after 12/15 S WD -02 3 Caliper Survey Annual MIT S WD -02 3 SSSV, drift, tag Annual MIT S WD -02 3 SSSV post MIT Annual MIT S Alp -01 A 4 Prep for observation gauges Ready after 3/1/2001 S Berg -02 A 4 Pull gauges for pulse test Ready after 3/1/2001 S Berg -02 A 4 Prep for observation gauges Ready after 3/1/2001 E-LINE E CD1 -21 1 SCMT Pending rig move 2/15 E CD1 -26 2 WFL Combo with SCMT jobs E WD -02 3 WFL and Temp Survey Annual MIT E Alp -01 A 4 Run observation gauges Ready after 3/1/2001 E Alp -01 A 4 Clean out for obs gauges Ready after 3/1/2001 E Berg -02 A 4 Run observation gauges Ready after 3/1/2001 CTU C CD1 -38 I Memory spinner log Ready after 2/1 C CD1 -40 1 Memory spinner log Ready after 2/1 C CD1 -41 1 Memory spinner log Ready after 2/1 C CD1 -43 1 Memory spinner log Ready after 2/1 C CD1 -44 1 Memory spinner log Ready after 2/1 OTHER WORK O CD1 -21 3 FIowback injection well prestartup Ready after 1/29 O CD1 -16 4 Flowback injection well prestartup Ready after 10/30 O CD1 -23 4 Flowback injection well prestartup Ready after 10/30 C NKALPN4OT 998D01 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 998W05 C NKALPN4OT 3^CD016 C NKALPN4OT 3ACD016 C NKALPN4OT 3ACD016 C NKALPN4OT 995W01 C NKALPN4OT 998W02 C NKALPN4OT 998W02 O NKALPN4OT 998D01 C NKALPN4OT 998B15 O NKALPN4OT 3ACD016 C NKALPN4OT 998W01 C NKALPN4OT 998W01 C NKALPN4OT 998W02 E NKALPN4OT 3ACD016 E NKALPN4OT 3ACD016 E NKALP N4OT 3ACD016 E NKALPN4OT 3ACD016 E NKALPN4OT 3ACD016 C NKALPN4OT 998D01 C NKALPN4OT 995W05 C NKALPN4OT 998W05 * KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 1 of I ~2 Notice of Public Hearing STATE OF ALASKA Alaska Oil and Gas Conservation Commission Re: The application of ARCO Alaska, Inc. for exception to 20 AAC 25.280 for the Kuparuk River Oil Pool, Kuparuk River Field. ARCO Alaska, Inc. by letter dated September 18, 1990, has requested an exception to the provisions of 20 AAC 25.280(a). The exception would eliminate the requirement for filing a form 10-403 (application for Sundry Approvals) prior to initiating certain workover operations in Kuparuk River Oil Pool wells, of the Kuparuk River Field. A person who may be harmed if the requested order is issued, may file a written protest prior to 4:00 pm October 19, 1990 with the Alaska Oil and Gas Conservation Commission, 3001 Porcupine Drive, Anchorage, Alaska 99501, and request a hearing on the matter. If the protest is timely filed, and raises a substantial and material issue crucial to the Commission's determination, a hearing on the matter will be held at the above address at 9:00 am November 6, 1990 in conformance with 20 AAC 25.540. If a hearing is to be held, interested parties may confirm this by calling the Commission's office, (907) 279-1433, after October 19, 1990. If no proper protest is filed, the Commission will consider the issuance of the order without a hearing. C Mmith Commi s s ioner Alaska Oil & Gas Conservation Commission Published October 3, 1990 -F · STATE OF ALASKA ADVERTISING ORDER Anchorage Daily N~s P. O. Box 1490~1 Anchorage, A!asl._%~. 99514-9001 A~#-5745 l':"j ii' /'"~ f Acct#-S?CF0330 ~/~, A0. AO#-08-5636 Attn: Pat~¥ Shanders AGENCY CONTACT Patty.- Shanders PHONE (907) 279-1433 DATES ADVERTISEMENT REQUIRED: Alaska Oil & Gas Conservation ~ssion 3001 Porcup~ Drive ~d%orage, AK 99501 ADVERTISING ORDER NO. 08-5636 DATE OF A.O. October 2, 1990 October 3, 1990 SPECIAL INSTRUCTIONS: AFFIDAVIT OF PUBLICATION UNITED STATES OF AMERICA Alaska STATE OF third DIVISION. SS BEFORE ME, THE UNDERSIGNED, A NOTARY PUBLIC THIS DAY PERSONALLY APPEARED Shelly ~an WHO, BEING FIRST DULY SWORN, ACCORDING TO LAW, SAYS THAT HE/SHE IS THE Legal Ad Rep. OF Daily News PUBLISHED AT Anchorage IN SAID DIVISION third AND STATE OF Alaska AND THAT THE ADVERTISEMENT, OF WHICH THE ANNEXED IS A TRUE COPY, WAS PUBLISHED IN SAID PUBLICATION ON THE 3rd DAY OF October 19 90 , AND THEREAFTER FORn° CONSECUTIVE DAYS, THE LAST PUBLICATION APPEARING ON THE 3rd DAY OF October 19 90, AND THAT THE RATE CHARGED THEREON IS NOT IN EXCESS OF THE RATE CHARGED PRIVA"r,;E JNDIV,4DJ~ALS. ,/~ .,,, s o.. o MY COMMISSION EXPIRES REMINDER-- INVOICE MUST BE IN TRIPLICATE AND MUST REFERENCE THE ADVERTISING ORDER NUMBER.' A CERTIFIED COPY OF THIS AFFIDAVIT OF PUBLICATION MUST BE SUBMITTED WITH THE INVOICE. ATTACH PROOF OF PUBLICATION HERE. ,r':,'!::~ .eti'Ce 0f'' Pu~i'iC Heari, 20:;;i )aruk River .~i?.]';'i: ..ARCO At ask a;. I n c. by.let- ter ~lated sepfember 18, 1990, Ilas' i'equeSted, an exception to t:h,'b',' P'r0visi,Ons' 6f '20" AAC 2~i'~380(a,,),~', T:h'e,eXcePtion Would eJit:m qate the: requirement for fi!'l ng ,a': ,form":'",10-'403" (applica- ti.6n :,for:. sundry' Approvals) ".pd6~".t011nl,t;i~'t:lfi'g ~ertain' wor- k0'v'e~ operations..in. Kuparuk 'River o .',.Po'6 'We s; 0f'.the ,.:Kuparuk .Ri:Vet F'ield, ". '' i~'''', "'A'i p~r'~0n. WhO ma?'"be'. · .ha'rme'd if 'the 'be~luested.,..o~der Is'issu'ea, 'may file a written' protest '~3r~or to 4.:00 pm Octo:' bet ~9, 1990 with the Alaska .Oi .~'and'Gas Conservation C:0m m;is.~!on C.. 3003.~. 'i PorcuPine Dr.va Ant,or a.=Je .'Alaska .~.~01 -mc r.'.c.es! .~ hearing o~. t.'c. :;n".e;;. "~.~," °rotest is ti.re'ely filed, ano. r'a~ses, a. sub: ' sta. ntla "dod' 'md're'rial issue dete~ml6ation~, a ~ neemng, on h~id,at:the i,"above:~.addreS{', at. ~.,00' am No~ .vembe~'. ~ 1990 in conformance Witl~','20,~iAAC 25 S40 If.a fiear- ,..~ig" :':i~'.~",~o .be.. held,, i rfferest.ed part ~..~ay '.c0nfil;m 'this: Dy c~tling :.the commission's ' of- fl~ei.:. (~_0'7),: 279:1433; after octo' ber:."]'9;,.'1990. ,If no p~oper P'r0tesf ~ s. flied, the'. C(~mmis'- sj'6n'Wl~l,l',,~consider tb'e issuance of..the~ 0~der. withouf'a hearing. /~i.L.;0'nnle C, Smith ". ' :' 'commiss oner , . A(aSka Oil: and Gas , ..'' . C'onservation Comm ssi(~n. Pbbi October 3, 1990 . .:.. AO~~ 08,5636 ~, . ,,,~,'I , , 02-901 (Rev. 6-85) PUBLISHER ~1 ARCO Alaska, Inc./['' Post Office Box 100360 A~chor~ge~ Alesk@ 9~510-0360 Telephone 907 276 1215 September 18, 1990 Mr. L. C. Smith Commissioner Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 RES ENG SR ENG COMM COMM SRENG ENG ASS'[' ENG ASST S--~--GEO--E---~_ -~-. E--O~-A,,: ST ~'-TEC~t ;FILE ' RE: Application for Exception to 20 AAC 25.280(a) Dear Mr. Smith: Please consider this letter a request by ARCO Alaska, Inc. as Operator of the Kuparuk River Unit, for an exception to the AOGCC's regulation 20 AAC 25.280(a). Applicant requests that the requirements of 20 AAC 25.280(a) be eliminated for all wells in the Kuparuk Oil Pool of the Kuparuk River Field. This regulation requires the filing of Form 10-403 (Application for Sundry Approvals) with respect to the following activities: (1) perforate or reperforate casing (2) stimulate, (3) pull tubing (4) alter casing, and (5) repair well. The Applicants believe that the above described activities have been conducted over a sufficiently long period of time such that their methods have become routine and the results predictable. The AOGCC will be able to continue monitoring these activities, since they are reported on Form 10-404 (Report of Sundry Well Operations), which is filed within 30 days after each well operation. Applicant believes that elimination of the Form 10-403 filing requirement as outlined above will not adversely affect ultimate recovery or create waste and conforms with prudent oil field operation and reservoir management. Sincerely, P. S. White Senior Operations Engineer RECEIVED SEP 0 990 N ska Oil & 6as uons. uomm'tss'tot ,, LAn laorago ARCO A~aska,