Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutCO 261Conservation Order Cover Page
XHVZE
This page is required for administrative purposes in managing the scanning process. It marks
the extent of scanning and identifies certain actions that have been taken. Please insure that it
retains it's current location in this file.
(~¢)_~' _ Conservation Order Category Identifier
Organizing
RESCAN
[] Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED (Scannable with large
plotter/scanner)
[] Maps:
[] Other items
OVERSIZED (Not suitable for
plotter/scanner, may work with
'log' scanner)
[] Logs of various kinds
[] Other
BY: ~~.~MARIA
Scanning Preparation
TOTAL PAGES
BY: ~¢~:~ ARIA
Production Scanning
Stage I PAGE COUNT FROM SCANNED DOCUMENT:
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ,~,r YES ~ NO
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES ~ NO
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES)
General Notes or Comments about this Document:
5/21/03 ConservOrdCvrPg.wpd
•
INDEX CONSERVATION ORDER NO. 261
Kuparuk River Field
1) September 18, 1990 ARCO Alaska, Inc. Request for a Spacing
Exception, Kuparuk River Field
2) October 3, 1990 Notice of Hearing, Affidavit of Publication
CONSERVATION ORDER NO. 261
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage, Alaska 99501-3192
Re:
THE APPLICATION OF )
ARCO ALASKA, INC for )
an order exempting )
Kuparuk River Unit )
operators from )
requirements of )
20 AAC 25. 280(a). )
Conservation Order No. 261
Kuparuk River Field
Kuparuk River Oil Pool
October 23, 1990
IT APPEARING THAT:
·
ARCO Alaska, Inc, operator of the Kuparuk River Unit (KRU),
Kuparuk River Oil Pool, requested the Alaska Oil and Gas
Conservation Commission by letter dated September 18, 1990
to exempt all wells in the KRU Kuparuk River Oil Pool from
the requirements of 20 AAC 25.280(a).
·
Notice of Public Hearing on this request was published in
the Anchorage Daily News on October 3, 1990 pursuant to
20 AAC 25.540.
3. No protests to the application were received.
FINDINGS:
I ·
20 AAC 25.280(a) requires operators to file an Application
for Sundry Approvals (form 10-403) and receive Commission
approval prior to performing well workovers.
·
Current well activity in the KRU Kuparuk River Oil Pool is
dominated by the types of workover operations set forth in
20 AAC 25.280(a).
·
These workover operations include.. 1) perforating or
reperforating casing; 2) stimulating; 3)pulling tubing;
4) altering casing; and, 5) repairing well.
·
Procedures for these well workovers have become standard and
routine for wells in the KRU Kuparuk River Oil Pool.
·
Information required with the Application for Sundry
Approvals for these operations is repetitive for wells in
the KRU Kuparuk River Oil Pool.
Conservation Order~ ~o. 261
October 23, 1990
Page 2
,
·
·
Records and reports of well workovers must be maintained by
the operator as required by 20 AAC 25.280(c).
Changes in well status or configuration and the results of
well workover operations must be reported by the operator on
a Report of Sundry Well Operations (form 10-404) as required
by 20 AAC 25.280(d).
A current schedule of upcoming workover operations is
necessary for the Commission to exercise its compliance
responsibilities.
CONCLUSIONS:
Elimination of the requirements of 20 AAC 25.280(a) for all wells
in the KRU Kuparuk River Oil Pool of the Kuparuk River Field will
not promote waste nor jeopardize correlative rights.
NOW, THEREFORE, IT IS ORDERED:
Rule 1
The requirements of 20 AAC 25.280(a) are hereby waived for those
wells in the KRU Kuparuk River Oil Pool of the Kuparuk River
Field.
Rule 2
The operator shall provide the Commission with a listing of
planned workover operations including the well and intended
operation on a weekly basis.
DONE at Anchorage, Alaska and dated October 23, 1990.
Lon ,
r.
Alaska Oil and Gas Conservatzon Conmission
Alaska Oil ~
,ommlssloner
las Conservation Commission
~PHILLIPS Alaska, Inc.
A Substd~ry o1' PHILLIPS PETROLEUM COMPANY
Steve Bradley
Well Operations Supervisor
Kuparuk Production
NSK-69
Phone: 659-7348
Fax: 659-7314
..... ONLY..
Comm
-~omm
..
,File
April 9, 2001
Mr. Daniel Seamount, Chairman
Alaska Oil and Gas Conservation Commission
333 West 7" Avenue, Suite 100
Anchorage, Alaska 99501
Dear Mr. Seamount:
Attached is a listing of upcoming operations in the KuparUk and Alpine Fields.
This listing is provided as required under the terms of Conservation Order No.
261.
If additional data or scheduling information is needed, please call.
Sincerely, ~,~
Steve Bradley
Well Operations Supervisor
Attachments
cc: File: FAR 040902, ATO 370
WWPL 3.14
RECE/VE .,
APt~ j 3 ?001
Alaska Oil & Gas Cons.
Anchorage CCmrniss/o,
Phillips Alaska. Inc. is a Subsidiary of Phillips Petroleum Company
GREATER KUPARUK ENGINEERING WELL WORK PRIORITY
J Type DS WL BOPD PR StelWork Description
SLICKLINE
ComrnentsJStatuslTiming
4/9/OI 3:44 PM
Cos/ Property I AFC
Cod~Charge Code
S lB -11
S 2A -15
S 2X -16
S 3Q -15
S lB -14
S 1L -09
S 1 D -34
S 1D -110
S 1D -113
S 1D -141
S 3A -03
S 2L -3O5
S 3F -15
S 2U -07
S 2X -03
S 3B -10
S 3Q -21
S 3R -25
S 2A -12
S 2H -09
S 2N -337
S 2N -318
S 2N -307
S 2A -13
S 2D -05
S 2N -349
S 2N -325
S 30 -16
S 3N -16
S 2U -14
S 2V -16
S 30 -04
S 2W -10
S 1G -01
S 3C -O6
S 2V -O2
S 3M -24
S lA -19
S 1Y .32
S 3H -26
S 1E -20
S 1 B -05
S 3B -16
S 3A -18
S 3G -07
S 1G -O7
S 1 G -02
S 1Y -04
S 3H -01
S 3J -O6
S lA -18
S 1 B -04
S lB -14
S 1 D -38
S 1F -01
S 1F -02
S 1 F -07
S 1G -17
S 1H -06
S 1H -O8
S 1H -11
S 1H -15
S 1H -16
S 1J -O3
S 1J -03
S 1J -09
S 1L -14
S 1 L -28
S 1 R -O9
S 1R -12
S 1R -26
S 1Y -31
SE
800
700
SE
370
300
200
A 250
250
A 1000
T
T
w/3F
w/3F
a 400
300
D,T
500
i 200
A D,T
D,T
A
lO0
lOO
lO0
25
A 25
1 1 D & T for LDL; set TTP and CMIT T x IA, pull TTP
2 Pre-Nordic 3 Slickline work
3 Gauge & C-sand injeclivity test
4 1 D & T for LDL; set 'FrP and CMIT T x IA, pull 'I-I'P
5 1 Pull DCR Run DV
6 Post frac GLD
7 1 D&T dummy Run for Add Peals
8 Pull and Replace Pump
9 Troubleshoot Pump (replace SOV)
10 Pull 4.5' Pump
11 1 SBHP/Driff tbg/Pull GHP liner top pkdDrift liner
12 Drift & tag
13 MI IPROF w/SWS PSP tools if possible
14 1 MI IPROF w/SWS PSP tools if possible
15 MI IPROF w/SWS PSP tools if possible
16 G&T, open C Sand, C-only SBHP
17 SBHP,state MIT -- Regulatory in progress
18 State MiT -- Regulatory
19 1 Iso A Sand for C Sand SI Squeeze
20 Open C-sand
21 1 Paraffin Cut & Tag Fill
22 1 Paraffin Cut & Tag Fill
23 MI Injection Profile (tag&drift necessary)
24 Pre-Nordic 3 Slickline work
25 2 Open C sand
26 MI Injection Profile
27 MI Injection Profile (tag&drift necessary)
28 Memory IPROF (MI injection)
29 Gauge & Tag / Inspect Production CVs
30 1 PrelPROF SL- tag/drift
31 Set Pannex Gauges / Run Jet Pump
32 72-hr PBU w/DHSIT - No GLRDI
33 CV Check
34 CV PM
35 Close C Sand for SZT
36 1 PrelPROF SL-tag/drift
37 1 Pull HES ret. Patch; D&Tfor per/s
38 PM CV's
39 install GLD and tag
40 Deepen GLV design
41 Run Gas Lift Design
42 1 Pull BPi and Run BPI w two 1/4" pods
43 G&T, open C Sand, C-only SBHP
44 GLTS & PT tubing / ann comm
45 GLRD for rate
46 CV PM
47 CV PM
48 inspect CV's & AVA
49 1 PDS multi-finger caliper
50 GLRD for maintenance
Close & Open C Sand for SZT
i 50 Open C sand
370 3 SBHP & GLD
i 200 1 Troubleshoot possible obstruction at 13460 pre Log/per/
200 2 Continue Fishing (post-video log)
i Pull Replace sleeve
10 Tag/Close C
150 Drift with Dummy Straddle
Run Plug and MITT
i SBHP (4 day SI needed)
1 D&T for DEFT/PPROF
1 D&T for Opportunity DEFT/PPROF
SBHP (1 day SI needed)
500 1 Pest Rig Pull DCR/Run DV
500 3 Dummy Gun run 20'x2.5"
500 1 Post Rig Pull DCPJ Run DV
i 1 D&T for IPROF
25 Install GLD
i 50 SBHP
2 CV Check
i 1 C sand AVA PM, D&T pre IPROF
100 tag tt plug gage tubing
Ann Comm-T x IA communication, failed MIT (camp grey-water injector)
Ready affer packer test completes on 04/09
Well is SI, suspect C-sand is scalled off on this 5000 bfpd producer
Ann Comm-T x IA communication, failed MIT
Post rig well work - Ready
Well most likely will not flow w/o GL
in progress
Replace Worn Pump. Economics very favorable (ROR>100%) with run life of ¢
Completed acid flowback.
AFC for expense rig workover being written; rig expected late April
Prep well CT Acid stimulation; acid stim tool ready in -2-3 weeks
In prep for e-line log.
Try to get ASAP, ready to convert to water; w/2U & 2X work
Ready - priority moved up to do with 3F-15 MI profile
Ready - priority moved up to do with 3F-15 MI profile
MI coming to DS3B in summer; pressure planning
Still need MIT w/AOGCC witness & pull plug
Ready (no SBHP required, well is not SI)
Ready
Tag & run HFCVs in post frac well - Pending SI Squeeze
Prep for Champion Chemical treatment - schedule -4/16
Prep for Champion Chemical treatment - schedule -4/16
Ready - need to complete by mid-May
Nordic 3 to move on well - 04/20
In progress, SBHP complete 2 of 3 DV's replaced w/CV's
Ready - need to complete by mid-May
Ready - need to complete by mid-May
Call PE before scheduling job - check inj rates; G&T probably needed.
Way overdue for inspection...
Ready - need prior to water conversion.
In progress
Eval damage, rate down 100 bopd; DO NOT DO GLRD NOW
Ready, do in conjunction with 2W-13 PBU
CV's in Ground since 7~97
reservoir surveillance
Required for Tuan's A-sand Type Curve development due in May
FP well & load backside for GL unloading later
asset preservation - erosion seen in past 9/99
ready
Move OV from sin #1 to stn #2.
Ready - well dies
Ready
**Need A-only SPFO completed first.** MI to DS3B; press planning
Identified failed check or GLV out of pocket w/TIFL
Well not on OV due to bad unloading valve. **Revised procedurel
CV's in Ground since 2/99
CV's in Ground since 4/99
Last cv inspec 7/98
Determine extent of scale deposition for remedial action
Big slugger, difficult to test well
Pull TPC/wait tor 1 week (for SZT) / Rerun TPC
Needed for WF mgmt
After FCO
Pending Video, fishing tools
Pending PWN Eval
Shuts in water production
will need SI
OK to tag while SI - but has WRDP
Opportunity pressure
Ready
Ready
Ready
Be aware of cement sheath 6000-6130'
JT freezing effect across choke with current OV
SI injector - Want to BOL after SBHP
after scale hydroblast
Last PM 2/99, combine with IPRF D&T
Eval ability to pull plug from TT - History of bad Csd scale
E 23ODS10BL K85329
E 230DS28AO waiting on
E 230DS28XL K85329
E 230DS36QL K85329
C 230DS10BG AK0158
E 230DS10GL K85328
C 230DS10DG AK0102
E 25WS1D6EP K85328
E 25WS1D6DL K85328
E 25WS1D6DL K85328
C 230DS36AG AK0132
E 35TN2L1LL K85327
E 230DS36FL K85327
E 23ODS28UL K85327
E 230DS28XL K85327
E 230DS36BL K85329
E 230DS36QL K85329
E 230DS36RL K85329
E 230DS28AL K85329
E 35TN2NSPF K85328
E 35TN2NSPF K65328
E 35TN2N1NL K85327
E 230DS28AO waiting on
E 230DS28DL K65329
E 35TN2NSPF K85328
E 35TN2N1NL K@5327
E 230DS36OL K85327
E 230DS36NL K85329
E 230DS28UL K85327
E 230DS28VL K85328
E 230DS36OL K$5327
E 230DS28WL K$5329
E 230DS10GL K65328
E 230DS36HL K85327
E 230DS28VL K85327
E 230DS36ML K65328
E 230DS10AL K85328
E 230DS10YL K85328
E 230DS36HL K85328
E 230DS10EL K85328
E 230DS10BL K85329
E 230DS36BL K85329
E 230DS36AL K85328
E 230DS36GL K85328
E 230DS10GL K85328
E 230DS10GL K65328
E 230DS10YL K85329
E 230DS36HL K65329
E 230DS36JL K65329
E 230DS10AL K85327
E 230DS10BL K85329
C 230DS10BG AK0158
C 230DS10DG AK0094
E 230DS10FL K@5329
E 230DS10FL K85329
E 230DS10FL K85329
E 230DS10GL K85235
E 230DS10HL K85329
E 230DS10HL K85327
E 230DS10HL K85327
E 230DS10HL K85327
E 230DS10HL K85327
C 230DS10JG AK0147
C 230DS10JG AK0147
C 230DS10JG AK0148
E 230DS10LL K85327
E 230DS10LL K85329
E 230DS10RL K85327
E 230DS10RL K85329
E 230DS10RL K85329
E 230DS10YL K85329
KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP,, OP. TP=PENDING WORK Page 1 of 4
GREATER KUPARUK ENGINEERING WELL WORK
IType
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
'~TY LIST
DS WL BOPD PR StelWork Description
2A -O6 i
2A -22
2B -02 25
2B -03
2C -03
2D -O6B
2G -14 i
2H -04 i 0
2H -05 i D. T
2K -09 30
2M -13
2M -17
2T -15 i
2U -04 150
2U -12
2W -13 T
2Z -15
2Z -19
3A -05
3A -17
3B -14
3C -13
3G -17
3H -18 i
3J -03
3J -17
3K -23 50
3M -01 50
3M -08
3N -07 100
30 -10 i
3Q -10
3Q -11 20
2N -329 D, T
1D -06
1E -21 i
1F -16
1H -15
1L -10
lQ -15
2A -11 200
2B -07 i
2B -10 i
2B -10 i
2C -04
2C -13
2M -30
2M -31
2N-321 A D,T
2N -331 D, T
2N -343 D, T
2T -209
3H -01 20
3H -12
30 -12
3Q -02
2 SI C-sand
1 Install GLD
Install GLD
Tag Fill
1 Pre IPROF SL- tag/drift
SBHP
Pull and re-run DV's
SBHP on injector
Tag Fill/Get Sample
1 New GLD
48 Hour PBU w/DHSIT
Tag/Drift & MI Injection Profile
Open C Sand / SBHP
I Pre Patch SL
Lockout SSSV
72 Hour PBU
Erosion/scale CV check
Shut-In C Sand
Lock Out SSSV
Gauge & Tag
48-hr PBU
Tag & PBU w/DHSlT
1 D&T
Troubleshoot injector tubing x 7" ann comm
GLRD
GLRD
Drift for scale
1 Gauge & Tag; dummy gun run
GLRD (move OV uphole)
72-hr PBU NO DHSIT; set on collar/tbg stop
Lock Out SSSV
PBU w/DHSIT
GLRD for rate
SBHP with a tag&drift
Lock Out SSSV
CV PM
Run tbg plug for Alt MIT
3 Run WRDP after PPROF
Open C Sand
Tag & SBHP -
GLD for A-sand production
Close C sand
MI Injection Profile
Close C sand
Tag & Gauge / MI IPROF Memory Log
SBHP Opportunity Work
MI Injection Profile
MI Injection Profile
MI Injection Profile (tag&drift necessary)
MI Injection Profile (tag&drift necessary)
MI Injection Profile (tag&drift necessary)
Tag Fill
2 GLRD for rate
Lock Out SSSV and/or seal cont'l line leak
Memory IPROF
Memory IPROF (MI injection)
Comments/Status/l'lmln g
Ready after IPROF
Ready
Ready
Ready
Ready
Ready;, data for MI management
Ann Comm; T x IA comm, prep for MI injection
Ready, well is SI
Ready
Ready
Ready
On PWI.
Ready
Ready
Ready
Ready
Ready
Ready - CTU mill complete.
Check with PE if well is ready.
Ready; well acts plugged; think FP went away; need for pre-ML planning
Opportunity pressure
Opportunity pressure, last PBU done 5 yrs ago
For PPROF, etc.
Ready; not a wellhead problem; need to resolve ASAP due to MI @ 3H
Ready
Ready
Ready, rate down slightly; recent scale treatment
Pre-C Sand peris
Ready - Need for accurate welltests, phase is erratic w/slugging
Summer PBU, evaluating skin for 4Q01 WO, corkscrewed tbg
Well wagged from MI to water injection, ready
Ready; opportunity pressure
post -GLS analysis
Well is currently on production
Complete prior to RIH with any tools
CV's in Ground since 2/98 SI wi Derated flowllne 1126/01
after PPROF
After HPBD
Has Ice plug
On hold as C-sand is dpen & no lift gas required
Ready
On PWI.
On hold per Mushovic/Dobson
On PWl, Choke Well to 6000 MCFD for 7 Days Prior to Logging
Ready after 9/24
On PWI, Evaluating injectivity and possible plugging damage
On .PWI,Evaluating tubing restrictions
Ready after SRT analysis - need to complete by mid-May
Ready after SRT analysis - need to complete by mid-May
Ready after SRT analysis - need to complete by mid-May
Do Work Next Time Pump is Down
On hold pending scale determination
SSSV not locked out; can't keep panel pressured; chk'ing PWS sol'n
Need tag; well currently on water due to wellhead integrity prob.
On water now; gauge & tag & set frac sleeve probably needed
4/9/01 3:44 PM
Property
Charge Code
E 230DS28AI K85327
E 230DS28AL K85329
E 230DS28BL K85329
E 230DS28BL K85329
E 230DS28CL K85327
E 230DS28GL K85329
E 230DS28HL K85329
E 230DS28HL K85329
E 230DS28KL K85329
E 230DS28ML K85327
E 230DS28ML K85327
E 230DS28TL K85329
E 230DS28UL K85329
E 230DS28UL K85329
E 230DS28WL K85327
E 230DS28ZL K85329
E 230DS28ZL K85329
E 230DS36AL K85329
E 230DS36AL K85329
E 230DS36BL K85327
E 230DS36CL K85327
E 230DS36GL K85327
E 230DS36HL K85329
E 230DS36JL K85329
E 230DS36JL K85329
E 230DS36KL K85329
E 230DS36ML K85328
E 230DS36ML K85329
E 230DS36NL K85327
E 230DS36OL K85329
E 230DS36QL K85327
E 230DS36QL K85328
E 35TN2N1NL K85327
E 230DS10DL K85329
E 230DS10GL K85328
E 230DS10FL K85329
E 230DS10HL K85327
C 230DS10LG AK0141
E 230DS10QL K85329
E 230DS28AL K85329
E 230DS28BL K85329
E 230DS28BL K85327
E 230DS28BL K85329
E 230DS28CL K85327
E 230DS28CL K85327
E 230DS28ML K85327
E 230DS28ML K85327
E 35TN2N1NL K85327
E 35TN2N1NL K85327
E 35TN2N1NL K85327
E 38TB2T6CL K85329
E 230DS36HL K85329
E 230DS36HL K85329
E 230DS36OL K85327
E 230DS36QL K85327
KEY: S=SUCKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS. SP, EP, CP, OP, TP=PENDING WORK Poge 2 of 4
GREATER KUPARUK ENGINEERING WELL WORK PRIC~ LIST 4/9/01 3:44 PM
DS WL
NOB PR SteplWorkDescription
Comments/Status/Timing
Cost Property IAFC
Code Charge Code
Cost Codes:
C= Capital
E= Expense
SLICKLINE
S Alp -01 B
S Berg -02 A
S CD1 -03
S CD1 NQ1
S CD1 -01
S CD1 -02
S CD1 -O3
S CD1 -09
S CD1 -10
S CD1 -10
S CD1 -13
S CD1 -16
$ CD1 -17
$ CD1 -21
S CD1 -22 A
S CD1 -23
S CD1 -24
$ CD1 -24
S CD1 -25
S CD1 -25
S CD1 -26
S CD1 -27
S CD1 -27
S CD1 -30
S CD1 -30
S CD1 -32
S CD1 -33
S CD1 -34
S CD1 -34
S CD1 -35
S CD1 -36
S CD1 -37
S CD1 -38
S CD1 -39
S CD1 -40
S CD1 -41
S CD1 -42
S CD1 -43
S CD1 -44
S CD1 -45
S CD1 NQ1
$ CD1 -19 A
E-LINE
E Alp -01 A
E Berg -02 A
CTU
CD1 -01
CD1 -02
CD1 -03
CD1 -10
CD1 -10
CD1 -13
CD1 -16
CD1 -21
CD1 -23
CD1 -24
1 Run observation gauges
I Run observation gauges
I Drift, tag, SBHP
I Drift, tag PBU
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
2 Pull SPM gauges poststartup
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
2 Pull SPM gauges poststartup
2 Pull/run SSSV for spinner
2 Pull SPM gauges poststartup
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for stim
2 Pull/run SSSV for stim
2 Pull/run SSSV for spinner
2 Pull/run SSSV for spinner
3 Drift, tag pre spinner
Ready 3/30
Ready 3/30
Repeat of recent SBHP
Hold till end of March
Ready after 12/15
When CT returns 4/4
Ready after 12/15
Ready after 12/15
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
At end of ice road season
4 Run observation gauges Ready after 3/1/2001
4 Run observation gauges Ready after 3/1/2001
1 Memory spinner log Ready after 3/5
1 Memory spinner log Ready after 3/5
I Memory spinner log Ready after 3/5
I Formic acid stim Ready when CT returns 4/5
I Memory spinner log Ready after 3/5
1 Memory spinner log Ready after 3/5
1 Memory spinner log Ready after 3/5
1 Memory spinner log Ready after 3/5
1 Memory spinner log Ready after 3/5
1 Formic acid stim Ready when CT returns 4/5
C NKALPN4OT
C NKALPN4OT
E 3ACDO16DH
C ASGENR3GN
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
C NKALPN4OT
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
C NKALPN4OT
E 3ACDO16DH
C NKALPN4OT
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
NKALPN4OT
NKALPN4OT
3ACDO16DH
3ACDO16DH
3ACDO16DH
3ACDO16DH
3ACDO16DH
3ACDO16DH
3ACDO16DH
3ACDO16DH
3ACDO16DH
3ACDO16DH
998W01
998W02
B00327
ASD003
B00327
B00327
B00327
998W05
B00328
B00327
B00327
B00327
998W05
B00327
998W05
B00327
B00328
B00327
B00328
B00327
B00327
B00328
B00327
B00328
B00327
B00327
B00327
B00328
B00327
B00328
B00327
B00327
B00328
B00327
B00328
B00328
B00327
B00328
B00328
B00327
B00327
B00327
998W01
998W02
B00327
B00327
B00327
B00328
B00327
B00327
B00327
B00327
B00327
B00328
KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK , Page 1 of 4
GREATER KUPARUK ENGINEERING WELL WOr IORITY LIST 4/9/01 3:44 PM
C CD1 °24
C CD1 -25
C CD1 -25
C CD1 -26
C CD1 -27
C CD1 -27
C CD1 -30
C CD1 -30
C CD1 -32
C CD1 -33
C CD1 -34
C CD1 -34
C CD1 -35
C CD1 -36
C CD1 -37
C CD1 -38
C CD1 -39
C CD1 -40
C CD1 -41
C CD1 -42
C CD1 -43
C CD1 -44
C CD1 -45
C CD1 NQ1
O
SA
OTHER WORK
CD1 -14
CD1 -14
1
Memory spinner log
MudSOLV stim
Memory spinner log
Memory spinner log
MudSOLV stim
Memory spinner log
Formic acid stim
Memory spinner log
Memory spinner log
Memory spinner log
MudSOLV stim
Memory spinner log
Formic acid stim
Memory spinner log
Memory spinner log
Formic acid stim
Memory spinner log
Formic acid stim
MudSOLV stim
Memory spinner log
MudSOLV stim
Formic acid stim
Memory spinner log
Memory spinner log
I
Ready after 3/5
Ready when CT returns 4/5
Ready after 3/5
Ready after 3/5
Ready when CT returns 4/5
Ready after 3/5
Ready when CT returns 4/5
Ready after 3/5
Ready after 3/5
Ready after 3/5
Ready when CT returns 4/5
Ready after 3/5
Ready when CT returns 4/5
Ready after 3/5
Ready after 3/5
Ready when CT returns 4/5
Ready after 3/5
Ready when CT returns 4/5
Ready when CT returns 4/5
Ready after 3/5
Ready when CT returns 4/5
Ready when CT returns 4/5
Ready after 3/5
Ready after 3/5
1 Flowback post rig
1 Post rig plugs, SBHP Waiting on Doyon 19
I C°st IPr°perty I
E 3ACD016DH B00327
E 3ACD016DH B00.~
E 3ACD016DH B003.'117
E 3ACD016DH 1900327
E 3ACD016DH B00328
E 3ACD016DH B00327
E 3ACD016DH B00328
E 3ACD016DH B00327
E 3ACD016DH B00327
E 3ACD016DH B00327
E 3ACD016DH B00328
E 3ACD016DH B00327
E 3ACD016DH B00328
E 3ACD016DH B00327
E 3ACD016DH B00327
E 3ACD016DH B00328
E 3ACD016DH B00327
E 3ACD016DH B00328
E 3ACD016DH B00328
E 3ACD016DH B00327
E 3ACD016DH B00328
E 3ACD016DH B00328
E 3ACD016DH B00327
E 3ACD016DH B00327
C NKALPN4OT 998D02
C NKALPN4OT 998D02
KEY: S=SLICKLINE, E=E-LINE, C=CTU. O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 2 of 4
Type DS WL
E-UNE
E lB -11 i
E 2L -305
E 1D-34
E 3Q -15
E 1D -40
E 30 -19
E 1D -39
E 1 D -38
E 1D -32
E 2V -02
E 1F -01
E 3G -14
E 3M -24
E 3M -01
E 1H -11
E 1D -121
E 1D -135
E 1H -15 '
E 1L -14 i
E lQ -23
E 1R -26 i
E 1Y -22
E 2A -O6 I
E 2C -03
E 2D -13
E 2D -13
E 2U -04
E 2U -14
E 2V -O3
E 2X -01
E 3G -17
E 3J -16
E 30 -05
EP 2N -323
EP 2N -337
EP 1D -102
EP 1 D -124
EP 1D -140
EP 2L -317
EP 3A -15
EP 3F -21
EP 3F -21
GREATER KUPARUK ENGINEERING WELL WORK PRIORITy'
BOPD PR StelWork Description
CTU
SE I 2
T 2
200 3 2
i SE 4 2
A 200 5 1
i T 6 1
i 200 7 1
i 200 8 2
i 200 9 1
T 10 2
200 11 1
A 150 12
100 13
50 14
15
i
i
'T
A T
T
New Well
New Well
LDL for tubing leak. LLR 0.25 BPM
SCMT
Add Peals
LDL for tubing leak. LLR 0.5 BPM
Perforate 10900-10944', SBHP
Re-run IBP for AOGCC MIT
CBL and Peal, SBHP
CBL and Perf 13955-14000, SBHP
CBL & Perforate 13804-13944, SBHP
PW IPROF
Run Video Log of fish
Video Log
2 SBHP/CH GR/Add-perfs/SBHP/rerun patch
2 Initial peal of C Sands
2 PPROF / GLS / DEFT
FBHP/Temp Survey on a live ESP
FBHP/I'emp Survey on a live ESP
2 Opportunity PPROF ! GLS / DEFT
2 IPROF after D&T
2 Opportunity PPROF / GLS
2 IPROF after D&T
Opportunity PPROF / GLS
2 PW IPROF
2 PW IPROF
2 PPROF
PPROF
2 Set tubing patch
2 PW IPROF
Waterflow Log
PW IPROF
2 PPROF w/poss DEFT, GLS/FBHP
IPROF (Tag good- ok to log, PWl)
IPROF (SWI)
USIT for cement evaluation
SCMT
FBHP/Temp Survey on a live ESP
FBHP/Temp Survey on a live ESP
FBHP/'remp Survey on a live ESP
Waterflow Log
Opportunity IPROF (SWI)
2 $CMT (post CTU cmt sqz)
3 Perf New injector & Initial SBHP (post SCMT)
C 3H -11 . 600 1 ECT Repair WO with Coil Platform
C 2N -341 500 2 Xylene wash and FCO
C 1B-14 370 3 2 FCOPost RigWO
C 2L -321 350 4 Cleanout paraffin/hydrates from tubing
C 2L -325 350 5 Xylene wash/soak
C 2N -326 300 6 Remove Hydrates & paraffin
C 2N -335 300 7 Fill Cleanout
C lQ -23 200 8 1 FCO (pre PPROF)
C 1R -12 50 9 1 Hydroblast Scale
C 3M -03 20 10 FCO
C 1J -03 500 11 2 FCO 11.1 ppg mud Post Rig
C 1J-09 500 12 2 FCO11.9 ppg mud Post Rig
C 3A -03 A 1000 2 CT acid stimulation, horiz A Sand well
CP 2L-317 A T Cement squeeze
CP 2D -03 220 1 Remove Coil Velocity String
CP 3F -21 i New Well 1 POSt rig cement sqz to isolate A &C sand
CP 3J -07 455 FCO in prep for WO/ST
Comments/Status/Timing
Ann Comm--T x iA communication, failed MIT. Camp grey-water injector.
Need to verify cement integrity for WAMI conversion - REVISED procedure.
After Dummy run/after FCO
Ann Comm--T x IA communication, failed MIT. Water injector.
SCMT tag 11034 3/10
SL pulled previous IBP - check w/PWS for final plan
tag 13534 3/27
ddft to 13460 3/10 FCO'd to 14252 2/16; revised depths
tag 14100 3/28 check revised perf depths
Required for Tuan's A-sand Type Curve development due in May
Attempt #3 - ready
tag @ 7129' (top A peal) - OK f/log; suspected casing damage
After SL prep
After D & T
after D &T-well changes WC after being on line
Well is already equipped with gas meter, ready.
Well is already equipped with gas meter, ready.
Need one week notice to BOL
Be aware of cement sheath 6000-6130'
Tag 9333 12/9 will need FCO
opportunity work
tagged 12/11/00 52' rathole
Ready
Ready after SL tag/drift
Ready after SL tag
Ready - IF done ASAP no SL tag needed
2z
Ready
Evaluate intra C-sand injection for profile mod
Ready After Water Injection Restored/Flowiine repairs underway
Aft D&T. Call PE if DEFT is not free to confirm running; opp. GLS & FBHP
Tag'd @ 8611' on 2/4/01 - no FCO but want splits between A3/A2
Ready; should not need tag
Need to verify cement integrity for WAMI conversion
Need to verify cement integrity for WAMI conversion
Needed for ESP & heat-trace studies, waiting on metering
Needed for ESP & heat-trace studies for upcoming development
Needed for ESP & heat-trace studies, waiting on metering
Reviewing casing re-cement work.
Well currently SI for pressure reduction; engineer will notify
SCMT 3-5-01: poor bond between A&C sand post rig
pending CTU cmt job results - SCMT. Surface work started 3/1.
Timing unknown, need to be ready anytime
Ready
After SL
Ready
Evaluating cleanout option.
In prep for Jet Pump in June
Ready
Should get rate buzz from FCO
need before CV check.
Tag'd fill over A1 sands @ 7805' on 1/20/01
Ready - flowline ready mid May
Ready - fiowline ready mid May
After SL prep work; straddle tool should be ready by last week April
SCMT showed poor cement integrity.
Waiting for current coil tubing to "mile" out.
SCMT 3-5-01: poor bond between A&C sand post rig - need procedure
Fill found to 1463' MD; waiting on ST plan to procede
4/9/01 3:44 PM
c°=lPr°pe"tY IAFC
CodtCharge Code
E 230DS10BL K85329
E 35TN2L1LL K85327
C 230DS10DG AK0102
E 230DS36QL K85329
C 230DS10DG AK0129
E 230DS36OL K85329
C 230DS10D(~ AK0121
C 230DS10DG AK0094
C 230DS10DG AK0107
E 230DS28VL k85327
E 230DS10FL K85329
E 230DS36GL K85329
E 230DS36ML K85328
E 230DS36ML K85328
E 230DS10HL K85327
E 25WSl D6EP K85327
E 25WSl D6EP K85327
E 230DS10HL K85327
E 230DS10LL K85327
E 230DS10QL K85329
E 230DS10RL K85327
E 230DS10YL K85327
E 230DS28AL K85327
E 230DS28CL K85327
E 230DS28DL K85328
E 230DS28DL k85327
E 230DS28UL K85329
E 230DS28UL K85327
E 230DS28VL K85327
E 230DS28XL K85327
E 230DS36GL K85327
E 230DS36JL K85327
E 230DS36OL K85327
E 35TN2N1NL K85327
E 35TN2N1NL K85327
E 25WS1D6EP K85327
E 25WS1D6EP K85327
E 25WS1D6EP K85327
C 35TN2N8NG AK0070
E 230DS36AL K85327
C 230DS36FO AK0135
C 230DS36FO AK0135
E 230DS36HO 999556
E 35TN2N1NL K85328
C 230DS10BG AK0158
E 35TN2L1LL K85328
E 35TN2L1LL K85328
E 35TN2N1NL K85328
E 35TN2N1NL K85328
E 230DS10QL K85329
E 230DS10RL K85329
E 230DS36ML K85328
C 230DS10JG AK0147
C 230DS10JG AK0148
C 230DS36AG AK0132
C 35TN2N8NG AK0070
E 230DS28DL K85328
C 230DS36FO AK0135
E 230DS36JL K85329
· KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK. T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK
Poge 3 of 4
GREATER KUPARUK ENGINEERING WELL WORK P 'ITY LIST
J T?o DS WL BOPD pR..S.,elWorkDescription ' I ICOmments/status/'Timing
4/9/01 3:44 PM
C°slPr°perty AFC ' 1
CodtCharge Codo
OTHER WORK
O 1RXX I SBG Treatson1R-03,04A, 13
OP 1D-32 i 200 2 HPBD
aP 1D-38 I 200 3 HPBD
aP 1D-39 I 200 2 HPBD
aP 1D 40 A 200 2 HPBD
aP 2N -318 3~ 2 M-209& FM-171 Treatment
aP 2N -337 A 4~ 2 M-209 & FM-171 Treatment
aP 3H -17 i 5~ A- Sand HPBD
will schedule with wells and DSLT
Need Proc; After Injectivity test
Need Proc; After Injectivity test
Need Proc
Need Proc; After Injectivity test
Schedule following paraffin scrape - chemicals to arrive 4/16
Schedule following paraffin scrape - chemicals to arrive 4/16
Tried 'poor boy' HPBD; still reviewing results per DSE 2/19/01.
E 230DS10RL K85328
C 230DS10DG AK0107
C 230DS10DG AK0094
C 230DS10DG AK0121
C 230DS10DG AK0129
E 35TN2N8PF K85328
E 35TN2NSPF K85328
E 230DS36HG 999438
CPF1 SCALE TREATMENTS
Sl-4004 SS-5206
PPM BBL~DRUM
T1 IE -12
T1 lA -19
T1 1G -13
T1 lC -04
T1 1Y -23
T1 1Y -19
T1P 1Y -28
T1P 2Z -13
I SI-4004 Treatment
2 SI-4004 Treatment NC
3 SI-4004 Treatment NC
4 SI-4004 Treatment C
5 SI-4004 Treatment A
6 SI-4004 Treatment A
SI-4004 Treatment NC
SI-4004 Treatment
18 2 Ready 7
25 3 Ready 6
17 2 Ready 10
6 1 Ready 12
4 1 Ready 7
7 1 Ready 7
31 3 Hold until wellis RTF;approx 1~01 8
10 1 Hold until wellis RTF 6
37800
98500
1055O0
1042O0
110600
107800
1185OO
1228OO
E 230DS10EL K85328
E 230DS10AL K85328
E 230DS10GL K85328
E 230DS10CL K85328
E 230DS10YL K85328
E 230DS10YL K85328
E 230DS10YL K85328
E 230DS28ZL K85328
CPF2 SCALE TREATMENTS
SI-4004 SS-5206
PPM BBLS/DRUM
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2P
T2P
2T -21
2D -12
2K -09
2M -07
2M -11
2M -13
2M -32
2T -03
2T -17
2V -O9
2W -01
2A -12
2T -37
I SI-4004 Treatment
2 SI-4004 Treatment A
3 2 SI-4004 Treatment - A sd
4 Sl-4004 Treatment A
5 SI-4004 Treatment AJC
6 St-4004 Treatment
7 SI-4004 Treatment
8 SI-4004 Treatment NC
9 SI-4004 Treatment NC
10 SI-4004 Treatment NC
11 SI-4004 Treatment NC
2 SI-4004 Treatment C
2 SI-4004 Treatment NC
5 1 Ready
4 1 Ready
2 1 Ready; Fca complete 02/20
5 1 Ready
4 1 Ready
2 1 Ready
2 1 Ready
2 1 Ready
14 1 Ready
23 2 Ready
33 3 Ready
9 1 Pasta sandlsolation
3 1 Post Gauge & Tag
6 19620O
7 109800
5 86300
7 105600
8 123400
6 71900
6 79700
7 118400
7 11540O
8 110500
7 105500
7 126100
7 115200
E 230DS28TL K85328
E 230DS28DL K85328
E 230DS28KL K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28TL K85328
E 230DS28TL K85328
E 23ODS28VL K85328
E 230DS28WL K85328
E 230DS28AL K85328
E 230DS28TL K85328
CPF3 SCALE TREATMENTS
Sl-4004 SS-5206
PPM BBLS/DRUM
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3
T3P
T3P
T3P
3F -05 I SI-4004 Treatment NC 20 2 Ready 6
3F -06 2 SI-4004 Treatment NC 18 2 Ready 7
3M -23 3 SI-4004 Treatment NC 10 1 Ready; Fill across Perf's 5
3N -09 4 SI-4004 Treatment NC 8 1 Ready; Fill across Perf's 7
3C -11 5 SI-4004 Treatment A/C 2 1 Wellwork completed, ready for treatment
3C -15 6 SI-4004 Treatment C 3 1 Ready 6
3G -18 7 SI-4004 Treatment NC 3 1 Ready 6
3G -21 A 8 SI-4004 Treatment A 2 1 Ready 6
3G -22 9 S1~4004 Treatment A 4 1 Ready 6
3A -05 10 SI-4004 Treatment A/C 3 1 Ready; Lock out SSSV? 6
3F -02 11 SI-4004 Treatment NC 20 2 Ready; has jet pump in well 6
3F -10 12 SI-4004 Treatment NC 23 2 Ready; has jet pump in well 7
3H -23 13 SI-4004 Treatment A 2 1 Ready 6
31-05 14 SI-4004 Treatment A 2 1 Ready 6
3J -19 15 SI-4004 Treatment A 2 1 Ready; Fill across Perf's 6
3Q -11 16 SI-4004 Treatment A 4 1 Ready 6
3Q -22 17 SI-4004 Treatment A 2 1 Ready 6
3R -19 18 SI-4004 Treatment A 7 1 Ready 6
3F -13 A SI-4004 Treatment NC 12 1 Closed C Sand on 3/29 before sqz could 5
3H -01 SI-4004 Treatment - C only 13 1 A sand producing, check residuals 1st. F 7
3N -14 SI-4004 Treatment A 6 1 Flow well for 30 days to reduce BHP
Sum of Scale Treatments SI-4004 bbls= 392 55 =bbls S$-5206
108,000
197,200
102,000
137,200
10,100
140,100
137,000
68,000
111,700
96,600
80,900
105,900
43,800
102,100
39,400
113,100
30,000
102,200
99,400
36,400
101,800
E 230DS36FL K85328
E 230DS36FL K85328
E 230DS36ML K85328
E 230DS36NL K85328
E 230DS36CL K85328
E 230DS36CL ,K85328
E 230DS36GL K85328
E 230DS36GL K85328
E 230DS36GL K85328
E 230DS36AL K85328
E 230DS36FL K85328
E 230DS36FL K85328
E 230DS36HL K85328
E 230DS361L K85328
E 230DS36JL K85328
E 230DS36QL K85328
E 230DS36QL K85328
E 230DS36RL K85328
E 230DS36FL K85328
E 230DS36HL K85328
E 230DS36NL K85328
· KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 4 of 4
PHILLIPS Alaska, Inc.
A S~bsldlary o{' PHILLIPS PETROLEUM COMPANY
Steve Bradley
Well Operations Supervisor
Kuparuk Production
NSK-69
Phone: 659-7348
Fax: 659-7314
April 2, 2001
ONLY
Mr. Daniel Seamount, Chairman
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Dear Mr. Seamount:
Attached is a listing of upcoming operations in the Kuparuk and Alpine Fields.
This listing is provided as required under the terms of Conservation Order No.
261.
If additional data or scheduling information is needed, please call.
Sincerely,
Well Operations SuperviSor
Attachments
cc: File: FAR 040202, ATO 370
WWPL 3.14
RECEIVED
/~PR 1 i ~00~
Alaska Oi~ & Gas Cons. Commission
Anchorage
Phillips Alaska. Inc. is a Subsidiary of Phillips Petroleum Company
'GREATER KUP~RUK ENGINEERING WELL WORK PRIO~~- ',ST ~'
\
4/2/01 2:48 PM
i Type DS WL NOB
PR I Step IWork Description
Comments/Status/Timing
Cost Property 1AFC
Code Charge Code
ICost CoSes:
C= CapitaJ
E= Expense
SLICKLINE
S Alp -01 B I Run observation gauges
S Berg -02 A 1 Run observation gauges
S CD1 -03 1 Drift, tag, SBHP
S CD1 NQ1 I Drift, tag PBU
S CD1 -01 2 Pull/run $SSV for spinner
S CD1 -02 2 Pull/run SSSV for spinner
S CD1 -03 2 Pull/run SSSV for spinner
S CD1 -09 2 Pull SPM gauges poststartup
S CD1 -10 2 Pull/run SSSV for stim
S CD1 -10 2 Pull/run SSSV for spinner
S CD1 -13 2 Pull/run SSSV for spinner
S CD1 -16 2 Pull/run SSSV for spinner
S CD1 -17 2 Pull SPM gauges poststartup
S CD1 -21 2 Pull/run S$SV for spinner
$ CD1 -22 A 2 Pull SPM gauges poststartup
S CD1 -23 2 Pull/run SSSV for spinner
S CD1 -24 2 Pull/run SSSV for stim
S CD1 -24 2 Pull/run SSSV for spinner
S CD1 -25 2 Pull/run SSSV for stim
S CD1 -25 2 Pull/run SSSV for spinner
S CD1 -26 2 Pull/run SSSV for spinner
S CD1 -27 2 Pull/run SSSV for stim
S CD1 -27 2 Pull/run SSSV for spinner
S CD1 -30 2 Pull/run SSSV for stim
S CD1 -30 2 Pull/run SSSV for spinner
S CD1 -32 2 Pull/run SSSV for spinner
S CD1 -33 2 Pull/run SSSV for spinner
S CD1 -34 2 Pull/run SSSV for stim
S CD1 -34 2 Pull/run SSSV for spinner
S CD1 -35 2 Pull/run SSSV for stim
S CD1 -36 2 Pull/run SSSV for spinner
S CD1 -37 2 Pull/run SSSV for spinner
S CD1 -38 . 2 Pull/run SSSV for stim
S CD1 -39 2 Pull/run SSSV for spinner
S CD1 -40 2 Pull/run SSSV for stim
S CD1 -41 2 Pull/run SSSV for stim
S CD1 -42 2 Pull/run SSSV for spinner
S CD1 -43 2 Pull/run SSSV for stim
S CD1 -44 2 Pull/run SSSV for stim
S CD1 -45 2 Pull/run SSSV for spinner
S CD1 NQ1 2 Pull/run SSSV for spinner
S CD1 -19 A 3 Drift, tag prespinner
E-LINE
E Alp -01 A 4 Run observation gauges
E Berg -02 A 4 Run observation gauges
CTU
C CD1 -01 1 Memory spinner log
C CD1 -02 I Memory spinner log
C CD1 -03 I Memory spinner log
C CD1 -10 I Formic acid stim
C CD1 -10 1 Memory spinner log
C CD1 -13 1 Memory spinner log
C CD1 -16 1 Memory spinner log
C CD1 -21 1 Memory spinner log
C CD1 -23 1 Memory spinner log
C CD1 -24 1 Formic acid stim
Ready 3/30
Ready 3/30
Repeat of recent SBHP
Hold till end of March
Ready after 12/15
When CT returns 4/4
Ready after 12/15
Ready after 12/15
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
When CT returns 4/4
At end of ice road season
Ready after 3/1/2001
Ready after 3/1/2001
Ready after 3/5
Ready after 3/5
Ready after 3/5
Ready when CT returns 4/5
Ready after 3/5
Ready after 3/5
Ready after 3/5
Ready after 3/5
Ready after 3/5
Ready when CT returns 4/5
C NKALPN4OT 998W01
C NKALPN4OT 998W02
E 3ACDO16DH B00327
C ASGENR3GN ASD003
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00327
C NKALPN4OT 998W05
E 3ACD016DH B00328
E 3ACDO'I6DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00327
C NKALPN4OT 998W05
E 3ACDO16DH B00327
C NKALPN4OT 998W05
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH,, B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00327
C NKALPN4OT 998W01
C NKALPN4OT 998W02
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACD016DH B00327
E 3ACD016DH B00327
E 3ACD016DH B00328
* KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK. T=SCALE TREATMENTS, SP, EP, CP. OP. TP=PENDING WORK Page 1 of 2
0
SA
"GREATER KUP,~RUK ENGINEERING WELL WORK PRI '.IST
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
CD1
-24 I Memory spinner log Ready after 3/5
-25 1 MudSOLV stim Ready when CT returns 4/5
-25 I Memory spinner log Ready after 3/5
-26 I Memory spinner log Ready after 3/5
-27 I MudSOLV stim Ready when CT returns 4/5
-27 I Memory spinner log Ready after 3/5
-30 I Formic acid stim Ready when CT returns 4/5
-30 I Memory spinner log Ready after 3/5
-32 1 Memory spinner log Ready after 3/5
-33 I Memory spinner log Ready after 3/5
-34 I MudSOLV stim Ready when CT returns 4/5
-34 1 Memory spinner log Ready after 3/5
-35 I Formic acid stim Ready when CT returns 4/5
-36 1 Memory spinner log Ready after 3/5
-37 I Memory spinner log Ready after 3/5
-38 I Formic acid stim Ready when CT returns 4/5
-39 I Memory spinner log Ready after 3/5
-40 I Formic acid stim Ready when CT returns 4/5
-41 I MudSOLV stim Ready when CT returns 4/5
-42 I Memory spinner log Ready after 3/5
-43 I MudSOLV stim Ready when CT returns 4/5
-44 I Formic acid stim Ready when CT returns 4/5
-45 I Memory spinner log Ready after 3/5
NQ1 I Memory spinner log Ready after 3/5
OTHER WORK
-14 I Flowback post rig
-14 I Post rig plugs, SBHP Waiting on Doyon 19
4/2/01 2:48 PM
] C°st I Pr°perty I
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00328
E 3ACDO16DH B00328
E 3ACDO16DH B00327
E 3ACDO16DH B00327
C NKALPN4OT 998D02
C NKALPN4OT 998D02
* KEY; S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Poge 2 of 2
Comments/Status/Timing
4/2/01
Property
Charge Code
Cost Codes:
C= Capital
E: Expense
2:49 PM
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
s
S
S
S
S
S
S
S'
S
S
S
S
S
S
S
S
SLICKUNE
lB -11 i SE 1
3Q-15 i SE 2
2Z -11 500 3
2N -303 D, 400 4
2N -309 350
2N -319 200 6
I C -07 425 7
1 D -34 200 8
1D-110 A 200 9
1D -141 10
2D-05 i 200 11
2D -05 i 200 12
1R -05 100 13
3H -03 100 14
3F -15 i T 15
2U-07 i w/3F 16
2X-03 i w/3F 17
3M -24 100 18
3Q -21 i T 19
3R -25 i T 2O
30 -04 100 21
2A -12 22
2H -09 23
2N-326 D,T 24
2N -307 D,T 25
2N-349 A D,T 26
2D -08 27
2N-325 D,T 28
2N-321 A D,T 29
2N-331 D,T 30
2N-343 D,T 31
3B -10 32
3B -15 33
30 -16 A 34
1R -20 100 35
2U -14 36
2V -16 100 37
3N -07 100 38
2W -10 39
lC -01 60 40
3C -06 50 41
1L -15 100 42
2V -12
2A -22
2W -13 T
lA -18
IA -19
lB -04 i 50
lB -05 i 25
lB -14
1D -38 i 200
1F -02 i
1 F -07 100
1G -02
1G -07
1G -15 50
1G -17 150
1H -06
1H -08
1H -11
1H -15
1H -16
1J -03 500
1 D & T for LDL; set 'I-I'P and CMIT T x IA, pull 'FrP
1 D & T for LDL; set 'I-I'P and CMIT T x IA, pull TTP
Open C Sands
Tag & Drift
Paraffin Cut
Paraffin Cut
Initial GLD
2 D&T dummy Run for Add Perfs
Pull and Replace Pump
Pull 4.5" Pump
1 SBHP
2 Open C sand
Jet Pump Inspection and nzle up size; LO SSSV
Open C Sand
MI IPROF w/SWS PSP tools if possible
1 MI IPROF w/SWS PSP tools if possible
MI IPROF w/SWS PSP tools if possible
1 Pull HES ret. Patch; D&T for perfs
SBHP,state MIT -- Regulatory
State MIT -- Regulatory
72-hr PBU w/DHSIT & GLRD
1 Iso A Sand forC Sand SI Squeeze
Open C-sand
Paraffin Cut & Tag fill
MI Injection Profile (tag&drift necessary)
MI Injection Profile
1 CIoseC sand
MI Injection Profile (tag&drift necessary)
MI Injection Profile (tag&drift necessary)
MI Injection Profile (tag&drift necessary)
MI Injection Profile (tag&drift necessary)
G&T, open C Sand, C-only SBHP
G&T, open C Sand, C-only SBHP
Memory IPROF (MI injection)
Changeout DGLV in Prod'n mandrel
1 Pre IPROF SL- tag/drift
Set Pannex Gauges / Run Jet Pump
72-hr PBU NO DHSIT; set on collar/tbg stop
CV Check
Initial GLD
Close C Sand for SZT
SBHP/Tag
Lockout SSSV
1 Install GLD
72 Hour PBU
Close & Open C Sand for SZT'
PM CV's
Open C sand
1 Pull BPI and Run BPI w two 1/4' ports
1 Pull Plug in 'l-r, Pull DCR Run DY
Ann Comm--T x IA communication, failed MIT (camp grey-water injector)
Ann Comm--T x IA communication, failed MIT
In Progress
Ready
Ready E
Ready E
Increasing WC well dies-1700 BOPD when flowing E
After FCO C
Replace Worn Pump. Economics very favorable (ROR>100%) with run life of ( E
AFC for expense rig workover being written E
Ready
After SBHP
erosional concerns
Potential C Sand eval for jet pump
Try to get ASAP, ready to convert to water;, note 2N & 30 work
Ready - priority moved up to do with 3F-15 MI profile
Ready - priority moved up to do with 3F-15 MI profile
FP well & load backside for GL unloading later
Ready - SBHP stop depths sent via Email
Ready (no SBHP required, well is not SI)
Eval damage, rate down 100 bopd; GLRD--Revised proc.
Ready
Tag & run HFCVs in post frac well - Pending SI. Squeeze
Ready
Ready - need to complete by mid-May
Ready - need to complete by mid-May
Data to evaluate drilling candidates.
Ready - need to complete by mid-May
Ready - need to complete by mid-May
Ready - need to complete by mid-May
Ready - need to complete by mid-May
MI coming to DS3B in summer; pressure planning
**Need A-only SPFO completed first.** MI to DS3B; press planning
On MI now; gauge & tag probably needed.
Leaking DGLV found in 1/13 log
Ready - need prior to water conversion.
Jet Pump must be in well by 04/01due to MI strategy on 2V drillsite.
Ready, evaluating skin for 4Q01 WO, corkscrewed tbg
Ready, do in conjunction with 2W-13 PBU
Declining GOR - Well ready for Gas lift
reservoir surveillance
Well SI; If pressure back up will BOL
Ready
Ready
Ready
Pull TPC/wait for 1 week (for SZT) / Rerun TPC
asset preservation - erosion seen in past 9/99
Needed for WF mgmt
3/14-21/01
Need Proc; Rig Expected c. 3/26
E 230DS10BL
E 230DS36QL
E 230DS28ZL
E 35TN2N8PF
35TN2N8PF
35TN2N8PF
230DS10CL
230DS 10DG
25WS1D6EP
25WS 1 D6DL
E 230DS28DL
E 230DS28DL
E 230DS10RL
E 230DS36HL
E 230DS36FL
E 230DS28UL
E 230DS28XL
E 230DS36ML
E 230DS36QL
E 230DS36RL
E 230D$36OL
E 230DS28AL
E 35TN2N8PF
E 35TN2N1NL
E 35TN2N8PF
E 230DS28DL
E 35TN2N1NL
E 35TN2N1NL
E 35TN2N1NL
E 35TN2N1NL
E 230DS36BL
E 230DS36BL
E 230DS36OL
E 230DS10RL
E 230DS28UL
E 230DS28VL
E 230DS36NL
E 230DS28WL
E 230DS10CL
E 230DS36HL
E 230D$10LL
E 230DS28VL
E 230DS28AL
E 230DS28WL
E 230DS10AL
E 230DS10AL
E 230DS10BL
E 230DS10BL
C 230DS10BG
C 230DS10DG
E 230DS10FL
E 230D$10FL
E 230DS10GL
E 230DS10GL
E 230DS10GL
E 230DS10GL
E 230DS10HL
E 230DS10HL
E 230DS10HL
E 230DS10HL
E 230DS10HL
C 230DS10JG
1 Troubleshoot possible obstruction at 13460 pre Log/pod
Pull Replace sleeve Pending PWN Eval
Tag/Close C
CV PM CV's in Ground since 4/99
CV PM CV's in Ground since 2/99
Initial GLD Ready
Drift with Dummy Straddle
Run Plug and MITT
SBHP (4 day SI needed) will need SI
1 D&T for Opportunity DEFT/PPROF
I D&T for Opportunity DEFT/PPROF OK to tag while SI - but has WRDP
SBHP (1 day SI needed) Opportunity pressure
I Post Rig Pull DCR/Run DV Ready
K85329
K85329
K85329
K85328
K85328
K85328
K85329
AK0102
K85328
K85328
K85327
K85329
K85329
K85329
K85327
K85327
K85327
K85328
K85329
K85329
K85327
K85329
K85328
K85327
K85328
K85329
K85327
K85327
K85327
K85327
K85329
K85329
K85327
K85329
K85327
K85328
K85327
K85329
K85329
K85327
K85327
K85329
K85329
K85327
K85327
K85328
K85329
K85329
AK0158
AK0094
K85329
K85329
K85328
K85328
K85328
K85235
K85329
K85327
K85327
K85327
K85327
AK0147
· KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK. T=SCALE TREATMENTS, SP, ER CP, OR TP=PENDING WORK Poge 1 of 4
,,'~REATER KUPA'RUK ENGINEERING WELL WORK PRIORITY I'~'
Type
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
.S
S
S
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
DS WL BOPD PR
1J -03 500
1L -14 i
1L -28 25
1R -09 i 50
1R -12
1 R -26
1Y -04
1Y -31 100
1 Y -32 50
2A -06
2A -15 D, 800
2A -15
2B -02 25
2B -03
2C -03
2D -06B
2G -14 i
2N -04 i 0
2H -05 i D, T
2K -09 30
2M -13
2M -17
2T -15 i
2U -04 150
2V -02
2Z -15
2Z -19
3A -05
3A -17
3B -14
3C -13
3G -07 A 25
3G -17
3H -01 20
3H-18 i
3H -26 50
3J -03
3J -06 i
3J -17
3K-23 · 50
3M -01 50
3M -08
3N -16
30-10 i
3Q -10
3Q -11 20
1D -06
1E -20
1E-21 i
1F -01 200
1F -16
1H -15
lQ -15
2A -11 200
2B -07 i
2B -10 i
2B -10 i
2C -04
2C -13
2M -30
2M -31
2N -318 300
2N -329 D, T
2N-337 A 400
2T -209
3H -01 20
3H -12 i
30-12 i
3Q -02
Work Description
3 Dummy Gun run 20'x2.5'
1 D&T for IPROF
Install GLD
SBHP
2 CV Check
I C sand AVA PM, D&T pre IPROF
Inspect CV's & AVA
tag tt plug gage tubing
Install GLD and tag
2 SI C-sand
1 Open C Sand
2 Open C Sand
Install GLD
Tag Fill
1 Pre IPROF SL- tag/drift
SBHP
Pull and re-run DV's
SBHP on injector
Tag Fill/Get Sample
1 New GLD
48 Hour PBU w/DHSIT
Tag/Drift & MI injection Profile
Open C Sand / SBHP
1 Pre Patch SL
1 Pre IPROF SL- tag/drift
Erosion/scale CV check
Shut-In C Sand
Lock Out SSSV
Gauge & Tag
48-hr PBU
Tag & PBU w/DHSIT
GLRD for rate
1 D&T
1 PDS multi-finger caliper
Troubleshoot injector tubing x 7" ann comm
Deepen GLV design
GLRD
GLRD for maintenance
GLRD
Drift for scale
1 Gauge & Tag; dummy gun run
GLRD (move OV uphole)
Gauge & Tag / Inspect Production CVs
Lock Out SSSV
PBU w/DHSIT
GLRD for rate
Lock Out SSSV
Run Gas Lift Design
CV PM
3 Continue Fishing (post-video log)
Run tbg plug for Alt MIT
3 Run WRDP after PPROF
Tag & SBHP -
GLD for A-sand production
Close C sand
MI Injection Profile
Close C sand
Tag & Gauge / MI IPROF Memory Log
SBHP Opportunity Work
MI Injection Profile
MI Injection Profile
1 Paraffin Cut & Tag Fill
SBHP with a tag&drift
1 Paraffin Cut & Tag Fill
Tag Fill
2 GLRD for rate
Lock Out SSSV and/or seal cont'l line leak
Memory IPROF
Memory IPROF (MI injection)
Comments/Status/Timing
Ready
Be aware of cement sheath 6000-6130'
JT freezing effect across choke with current OV
SI injector - Want to BOL after SBHP
after scale hydroblast
Last PM 2/99, combine with IPRF D&T
Last cv inspec 7198
Eval ability to pull plug from 'I~ - History of bad Csd scale
ready
Ready after IPROF
Ready
After Water Flow Log
Ready
Ready
Ready
Ready; data for MI management
Ann Comm; T x IA corem, prep for MI injection
Ready, well is SI
Ready
Ready
Ready
On PWI.
Ready
Ready
Ready
Ready
Ready - CTU mill complete.
Check with PE if well is ready.
Ready; well acts plugged; think FP went away; need for pre-ML planning
Opportunity pressure
Opportunity pressure, last PBU done 5 yrs ago
Well not on OV due to bad unloading valve. **Revised procedural
For PPROF, etc.
Determine extent of scale deposition for remedial action
Ready; not a wellhead problem; need to resolve ASAP due to MI @ 3H
Move OV from stn #1 to sin #2.
Ready
Big slugger, difficult to test well
Ready
Ready, rate down slightly; recent scale treatment
Pre-C Sand parrs
Ready - Need for accurate welltests, phase is erratic w/slugging
Way overdue for inspection...
Well wagged from MI to water injection, ready
Ready; opportunity pressure
post -GLS analysis
Complete prior to RIH with any tools
Need Proc;wait results of scale treat
CV's in Ground since 2/98 SI w/Derated fiowllne 1/26/01
Pending Video, fishing tools
after PPROF
Has Ice plug
On hold as C-sand is open & no lift gas required
Ready
On PWI.
On hold per Mushovic/Dobson
On PWI, Choke Well to 6000 MCFD for 7 Days Prior to Logging
Ready after 9/24
On PWl, Evaluating injactivity and possible plugging damage
On PWI,Evaluating tubing restrictions
Need Proc; Prep for Champion Chemical treatment
Well currently on production and waiting for final SI
Need Proc; Prep for Champion Chemical treatment
Do Work Next Time Pump is Down
On hold pending scale determination
SSSV not locked out; can't keep panel pressured; chk'ing PWS sol'n
Need tag; well currently on water due to wellhead integrity prob.
On water now; gauge & tag & set frac sleeve probably needed
4/2/01
Charge Code
C 230DS 10JG
E 230DS10LL
E 230DS10LL
E 230DS10RL
E 230DS10RL
E 230DS10RL
E 230DS10YL
E 230DS10YL
E 230DS10YL
E 230DS28AL
E 230DS28AL
E 230DS28AL
E 230DS28BL
E 230DS28BL
E 230DS28CL
E 230DS28GL
E 230DS28HL
E 230DS28HL
E 230DS28KL
E 230DS28ML
E 230DS28ML
E 230DS28TL
E 230DS28UL
E 230DS28VL
E 230DS28ZL
E 230DS28ZL
E 230DS36AL
· E 230DS36AL
E 230DS36BL
E 230DS36CL
E 230DS36GL
E 230DS36GL
E 230DS36HL
E 230DS36HL
E 230DS36HL
E 230DS36JL
E 230DS36JL
E 230DS36JL
E 230DS36KL
E 230DS36ML
E 230DS36ML
E 230DS36NL
E 230DS36OL
E 230DS36QL
E 230DS36QL
E 230DS10DL
E 230DS10EL
E 230DS10GL
E 230DS10FL
E 230DS10FL
E 230DS10HL
E 230DS10QL
E 230DS28AL
E 230DS28BL
E 230DS28BL
E 230DS28BL
E 230DS28CL
E 230DS28CL
E 230DS28ML
E 230DS28ML
E 35TN2NSPF
E 35TN2N1NL
E 35TN2N8PF
E 38TB2T6CL
E 230DS36HL
E 230DS36HL
E 230DS36OL
E 230DS36QL
2:49 PM
AK0147
K85327
K85329
K85327
K85329
K85329
K85329
K85329
K85328
K85327
K85329
K85329
K85329
K85329
K85327
K85329
K85329
K85329
K85329
K85327
K85327
K85329
K85329
K85327
K85329
'K85329
K85329
K85329
K85327
K85327
K85328
K85327
K85329
K85329
K85328
K85329
K85329
K85329
K85329
K85328
K85329
K85329
K85329
K85327
K85328
K85329
K85328
K85328
K85329
K85329
K85327
K85329
K85329
K85329
K85327
K85329
K85327
K85327
K85327
K85327
K85328
K85327
K85328
K85329
K85329
K85329
K85327
K85327
KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Poge 2 of 4
GREATER KUPA'RUK ENGINEERING WELL WORK PRIORITY~'?~ ·
I Type DS WL BOPD PR StelWork Description
E-UNE
I I IcOmments/status/Timing
4/2/01 2:49 PM
Cod~Charge Code ,
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EP
EP
EP
EP
EP
EP
EP
lB -11 i SE
3Q -15 i SE
30 -19 i T
1D -32 i 200
1D -38 i 200
1D -39 i 200
1D -40 A 200
1 D -34 200
2V -02
3G -14 A 150
3M -24 100
3M -01 50
2L -305 T
2N -323 T
2N -337 A T
1Y -22
2U -04
1D -121
1 D -135
1F -01 200
1H -11
1H -15
1L -14 i
lQ -23
1R -26 i
2A -06 I
2C -03
2D -13
2U -14
2V -03
2X -01
3G -17
3J -16 i
30 -05 i
1D -102
1D -124
1D -140
2L-317. A T
3A -15
3F -21 New Well
3F -21 N~w W~
CTU
2 LDL for tubing leak. LLR 0.25 BPM
2 LDL for tubing leak. LLR 0.5 BPM
1 Re-run iBP for AOGCC MI'FI'
2 CBL & Perforate 13804-13944, SBHP
2 CBL and Perf 13955-14000, SBHP
2 CBL and Perf, SBHP
I Perforate 10900-10944', SBHP
3 Add Peds
2 PW IPROF
Video Log
2 SBHP/CH GR/Add-perfs/SBHP/rerun patch
2 Initial peal of C Sands
Cement Bond Log
Cement Bond Log
Cement Bond Log
Opportunity PPROF / GLS
2 Set tubing patch
FBHP/Temp Survey on a live ESP
FBHP/Temp Survey on a live ESP
2 Run Video Log of fish
2 PPROF / GLS / DEFT
2 Opportunity PPROF / GLS / DEFT
2 IPROF after D&T
2 Opportunity PPROF/GLS
2 IPROF after D&T
2 PW IPROF
2 PW IPROF
2 PPROF
2 PW IPROF
Watedlow Log
PW IPROF
2 PPROFw/POssDEFT, GLS/FBHP
IPROF (Tag good- ok to log, PWI)
IPROF (SWI)
FBHP/Temp Survey on a live ESP
FBHP/Temp Survey on a live ESP
FBHP/'I'emp Survey on a live ESP
CBL/Perf/ISBHP
Opportunity IPROF (SWI)
2 SCMT (post CTU cmt sqz)
3 Perf New Injector & Initial SBHP (post SCMT)
Ann Comm-T x IA communication, failed MIT. Camp grey-water injector. E 230DS10BL K85329
Ann Comm-T x IA communication, failed MIT. Water injector. E 230DS36QL K85329
SL pulled previous IBP -- check w/PWS for final plan E 230DS36OL K85329
tag 14100 3/28 check revised perf depths C 230DS10DG AK0107
drift to 13460 3/10 FCO'd to 14252 2/16; revised depths C 230DS10DG AK0094
tag 13534 3/27 C 230DS10DG AK0121
SCMTtag 11034 3/10 C 230DS10DG AK0129
After Dummy run/after FCO C 230DS10DG AK0102
Ready E 230DS28VL k85327
tag @ 7129' (top A peal) - OK f/log; suspected casing damage E 230DS36GL K85329
After SL prep E 230DS36ML K85328
After D & T E 230DS36ML K85328
Need to complete in prep for WAMI conversion. E 35TN2L1LL K85327
Need to complete in prep for WAMI conversion. E 35TN2N1NL K85327
Need to complete in prep for WAMI conversion. E 35TN2N1NL K85327
Ready - tagged 12/11 - ensure well is online before scheduling E 230DS10YL K85327
Need pre patch SL work first E 230DS28UL K85329
Well is already equipped with gas meter, ready. E 25WS1D6EP K85327
Well is already equipped with gas meter, ready. E 25WSID6EP K85327
Attempt #3 - after FCO and SL work E 230DS10FL K85329
after D &T-well changes WC after being on line E 230DS10HL K85327
Need one week notice to BOL E 230DS10HL K85327
Be aware of cement sheath 6000-6130' E 230DS10LL K85327
Tag 9333 12/9 will need FCO E 230DS10QL K85329
opportunity work E 230DS10RL K85327
Ready E 230DS28AL K85327
Ready after SL tag/drift E 230DS28CL K85327
Ready after SL tag E 230DS28DL K85328
Ready E 230DS28UL K85327
Evaluate intra C-sand injection for profile mod E 230DS28VL K85327
Ready After Water Injection Restored/Flowline repairs underway E 230DS28XL K85327
Aft D&T. Call PE if DEFT is not free to confirm running; opp. GLS & FBHP E 230DS36GL K85327
Tag'd @ 8611' on 2/4/01 - no FCO but want splits between A3/A2 E 230DS36JL K85327
Ready; should not need tag E 230DS36OL K85327
Needed for ESP & heat-trace studies, waiting on metering E 25WSID6EP K85327
Needed for ESP & heat-trace studies for upcoming development E 25WS1D6EP K85327
Needed for ESP & heat-trace studies, waiting on metering E 25WS1D6EP K85327
Reviewing casing re-cement work. C 35TN2NSNG AK0070
Well currently SI for pressure reduction; engineer will notify E 230DS36AL K85327
SCMT 3-5-01: poor bond between A&C sand post rig C 230DS36FO AK0135
pending CTU cmt job results - SCMT. Surface work started 3/1. C 230DS36FO AK0135
C
C
C
C
C
C
C
C
C
C
C
CP
CP
CP
CP
CP
CP
CP
O
OP
OP
OP
OP
OP
3H -11 600
1 D -34 200
1 F -01 200
2L -321 350
2N -335 300
1L-20 a 100
lQ -23 200
1R -12 50
3M -03 20
1J -03 500
1J -09 500
2L -317 A T
lB -14
2D -03 220
2L -325 35O
2N -341 500
3F-21 i N*wW.~
3J -07 455
OTHER WORK
I ECT Repair WO with Coil Platform
2 1 FCO for Add perfs
3 1 FCO fill from Fish and reverse out with filtered SW
4 Cleanout paraffin/hydrates from tubing
5 Fill Cleanout
6 FCO (in progress)
7 1 FCO (pre PPROF)
8 1 Hydroblast Scale
9 FCO
10 2 FCO11.1ppg mud Post Rig
11 FCO ?? ppg mud Post Rig
Cement squeeze
2 FCO Post Rig WO
1 Remove Coil Velocity String
Xylene wash/soak
Fill Cleanout
1 Post rig cement sqz to isolate A & C sand
FCO in prep for WO/ST
1 R XX I SBG Treats on 1R-03, 04A, 13
1D-32 i 200 3 HPBD
ID-38 I 200 3 HPBD
1D-39 I 200 3 HPBD
1D-40 A 200 2 HPBD
2N -318 300 2 M-209 & FM-171 Treatment
Timing unknown, need to be ready anytime
Pre perf FCO
Check w/PWS may have tree leak, May need to pump heavy fluid to get on wE
Ready
Ready
Ready, Fill covering A sand perfs - also pre PPROF
Should get rate buzz from FCO
Tag'd fill over A1 sands @ 7805' on 1/20/01
Ready
Ready
SCMT showed poor cement integrity.
Need Proc; Rig Expected c. 3/28
Waiting for current coil tubing to "mile" out.
Evaluating cleanout option.
Evaluating cleanout options using xylene.
SCMT 3-5-01: poor bond between A&C sand post rig - need procedure
Fill found to 1463' MD; waiting on ST plan to procede
Need Proc; After Injectivlty test
Need Proc; After Injectlvlty test
Need Proc
Need Proc; After Injectivlty test
Need Proc; Schedule following paraffin scrape
E 230DS36HO 999556
C 230DS10DG AK0102
E 230DS10FL K85329
E 35TN2L1LL K85328
E 35TN2N1NL K85328
E 230DS10LL K85328
E 230DS10QL K85329
E 230DS10RL K85329
E 230DS36ML K85328
C 230DS10JG AK0147
C 230DS10JG AK0148
C 35TN2N8NG AK0070
C 230DS10BG AK0158
E 230DS28DL K85328
E 35TN2L1LL K85328
E 35TN2N1NL K85328
C 230DS36FO AK0135
E 230DS36JL K85329
E 230DS10RL K85328
C 230DS10DG AK0107
C 230DS10DG AK0094
C 230DS10DG AK0121
C 230DS10DG AK0129
E 35TN2N8PF K85328
* KEY: S=SLICKLINE, E=E-LINE. C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP. CP, OR TP=PENDING WORK Poge 3 of 4
<GREATER KUPA'RUK ENGINEERING WELL WORK PRIORITy;
\
I Type DS WL BOPD PR StelWork Description
OP 2N -337 A 400 2 M-2O9&FM-171 Treatment
OP 3H -17 i 500 A- Sand HPBD
CPF1 SCALE TREATMENTS
T1 1E -12
T1 lA -19
T1 1G -13
T1 lC -O4
T1 1Y -23
T1 1Y -19
T1P. 1Y -28
T1P 2Z -13
1 SI-4004 Treatment
2 SI-4004 Treatment NC
3 SI-4004 Treatment NC
4 Sl-4004 Treatment C
5 SI-4004 Treatment A
6 SI-4004 Treatment A
SI-4004 Treatment NC
SI-4004 Treatment
CPF2SCALE TREA3~IENTS
T2 2T -21
T2 2D -12
T2 2K -09
T2 2M -07
T2 2M -11
T2 2M -13
T2 2M -32
T2 2T -03
T2 2T -17
T2 2V -09
T2 2W -01
T2P 2A -12
T2P 2T -37
I SI-4004 Treatment
2 SI-4004 Treatment A
3 2 SI-4004 Treatment - A sd
4 SI-4004 Treatment A
5 SI-4004 Treatment A/C
6 SI-4004 Treatment
7 Sl-4004 Treatment
8 SI-4004 Treatment A/C
9 Sl-4004 Treatment A/C
10 SI-4004 Treatment A/C
11 SI-4004 Treatment A/C
2 SI-4004Treatment C
2 SI-4004 Treatment AJC
CPF3 SCALE TREATMENTS
T3 3F -05
T3 3F -06
T3 3M -23
T3 3N -09
T3 3C -11
T3 3C -15
T3 3G -18
T3 3G -21
T3 3G -22
T3 3A -05
T3 3F -02
T3 3F -10
T3 3H -23
T3 31-05
T3 3J -19
T3 3Q -11
T3 3Q -22
T3 3R -19
T3P 3F -13
T3P 3H -01
T3P 3N -14
SI-4004 SS-5206
18 2
25 3
17 2
6 1
4 1
7 1
31 3
10 1
SI-4004 SS-5206
5 1
4 1
2 1
5 1
4 1
2 1
2 1
2 1
14 1
23 2
33 3
9 1
3 1
SI-4004 SS-5206
I SI-4004 Treatment A/C 20 2
2 SI-4004 Treatment A/C 18 2
3 SI-4004 Treatment A/C 10 1
4 SI-4004 Treatment A/C 8 1
5 SI-4004 Treatment A/C 2 1
6 Sl-4004 Treatment C 3 1
7 SI-4004 Treatment AJC 3 1
8 Sl-4004 Treatment A 2 1
9 SI-4004 Treatment A 4 1
10 SI-4004 Treatment A/C 3 1
11 SI-4004 Treatment A/C 20 2
12 SI-4004 Treatment A/C 23 2
13 SI-4004 Treatment A 2 1
14 Sl-4004 Treatment A 2 1
15 SI-4004 Treatment A 2 1
16 SI-4004 Treatment A 4 1
17 SI-4004 Treatment A 2 1
18 SI-4004 Treatment A 7 1
SI-4004 Treatment A/C 12 1
SI-4004 Treatment - C only 13 1
SI-4004 Treatment A 6 1
Comments/Status/Timing
Need Proc; Schedule following paraffin scrape
Tried 'poor boy' HPBD; still reviewing results per DSE 2/19/01.
PPM BBLS/DRUM
Ready 7 37800
Ready 6 98500
Ready 10 105500
Ready 12 104200
Ready 7 110600
Ready 7 107800
Hold until well is RTF; approx 10/01 8 118500
Hold until well is RTF 6 122800
PPM BBLS/DRUM
Ready
Ready
Ready; FCO complete 02/20
Ready
Ready
Ready
Ready
Ready
Ready
Ready
Ready
Post A sand lsolation
Post Gauge & Tag
6 196200
7 1O98O0
5 86300
7 105600
8 123400
6 71900
6 79700
7 118400
7 115400
8 110500
7 105500
7 126100
7 115200
PPM BBLS/DRUM
Ready 6 108,000
Ready 7 197,200
Ready; Fill across Perf's 5 102,000
Ready; Fill across Perf's 7 137,200
Wellwork completed, ready for treatment 10,100
Ready 6 140,100
Ready 6 137,000
Ready 6 68,000
Ready 6 111,700
Ready; Lock out SSSV? 6 96,600
Ready; has jet pump in well 6 80,900
Ready; has jet pump in well 7 105,900
Ready 6 43,800
Ready 6 102,100
Ready; Fill across Perf's 6 39,400
Ready 6 113,100
Ready 6 30,000
Ready 6 102,200
Closed C Sand on 3/29 before sqz could 5 99,400
A sand producing, check residuals 1st. F 7 36,400
Flow well for 30 days to reduce BHP 101,800
412/01 2:49 PM
C°sl Pr°perry IAFC
Cod{Charge Cod~
E 35TN2N8PF K85328
E 230DS36HG 999438
E 230DS10EL K85328
E 230DS10AL K85328
E 230DS10GL K85328
E 230DS10CL K85328
E 230DS10YL K85328
E 230DS10YL K85328
E 230DS10YL K85328
E 230DS28ZL K85328
E 230DS28TL K85328
E 230DS28DL K85328
E 230DS28KL K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28TL K85328
E 230DS28TL K85328
E 230DS28VL K85328
E 230DS28WL K85328
E 230DS28AL K85328
E 230DS28TL K85328
E 230DS36FL K85328
E 230DS36FL K85328
E 230DS36ML K85328
E 230DS36NL K85328
E 230DS36CL K85328
E 230DS36CL K85328
E 230DS36GL K85328
E 230DS36GL K85328
E 230DS36GL K85328
E 230DS36AL K85328
E 230DS36FL K85328
E 230DS36FL K85328
E 230DS36HL K85328
E 230DS361L K85328
E 230DS36JL K85328
E 230DS36QL K85328
E 230DS36QL K85328
.E 230DS36RL K85328
E 230DS36FL K85328
E 230DS36HL K85328
E 230DS36NL K85328
KEY; S=SLICKLINE, E=E. LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, St:), EP, CP, OP, TP=PENDING WORK Poge 4 of 4
~PHILLIPS Alaska, Inc.
A Subsidiary o~ PHILLIPS PETROLEUM COMPANT
Steve Bradley
Well Operations Supervisor
Kuparuk Production
NSK-69
Phone: 659-7348
Fax: 659-7314
March 26, 2001
ONLY'
Mr. Daniel Seamount, Chairman
Alaska Oil and Gas Conservation Commission
333 West 7t" Avenue, Suite 100
Anchorage, Alaska 99501
RECEIVED
flPR U 2,
Alaska Oil & Gas Cons, Commission
Anchorage
Alaska Oil& Gas Cons. Anchorage
Dear Mr. Seamount:
Attached is a listing of upcoming operations in the Kuparuk and Alpine Fields.
This listing is provided as required under the terms of
If additional data or scheduling information is needed, please call.
Sincerely,
Well Operations Supervisor
Attachments
cc: File: FAR 032602, ATO 370
WWPL 3.14
Phillips Alaska. Inc, is a Subsidiary of Phillips Petroleum Company
' GRE ~ATER KUPARUK ENGINEERIN~ WELL WORK PRIORITY ~!~,"
I Type
!
DS WL BOPD PR Ste~Work Description
SUCKUNE
Comments/Status/Timing
3/27j01 2:24 PM
Cos~ Property
CodlCharge Code
3Q -15 i
3F -10
1D -42
2Z -11
2L -307
2L -321
2N -303
2N -309
2N -319
1L -11
3F -15 i
1C -07
2A -19
2X -02 i
1D -113
1D -39 i
ID -32 i
1D.34
1D 110A
1D -141
IL -09
1R -01
3G -19
2H -09
1G -04
2D -05
2D -05
3G -05
1R -05
3H -03
1L -09
3M -24
3Q -21
3R -25
30 -04
2A -12
2N -326
2N -307
2N -349
2D -08
2N -325
2N .321
2N -331
2N -343
30 -16
1R -20
2U -07
2X -03
2U -14
2V -16
3N -07
2W -10
2W -13
1C -01
3C -06
lA -18
lA -19
lB -04
lB -05
lB -14
1D -38
1F -02
1F -07
1G -02
1G -O7
SE 1
650 2
500 3
500 4
400 5
350 6
D, 400 7
350 8
200 9
300 10
T 11
425 12
300 13
300 14
220 15
200 16
200 17
200 18
200 19
20
200 21
B 110 22
100 23
24
i 200 25
i 200 26
i 200 27
150 28
100 29
100 30
200 31
100 32
i T
i T
100
D,T
D,T
A D,T
D,T
A D,T
D,T
D,T
A
100
i
i
100
100
i 5O
i 25
i 200
i
100
i
4
1
33
34
35
36 1
37
38
39
40 1
41
42
43
44
45
46
47 1
48
49 1
50
51
52
53
54
5S
D & T for LDL
Pull jet pump, tag fill, TS rate loss
Post Frac GL Design
Open C Sands
Paraffin Cut & Tag fill
Paraffin Cut/Tag fill/Inspect OV
Tag & Drift
Paraffin Cut
Paraffin Cut
Pull DCR run LGLV's
MI Injection Profile
Initial GLD
Hanger tubing screen
Open C Sand
Pull and Replace Pump
Dummy Gun run 20'x2.5' Pull SOV run DV
Pull SOV and run DV, Dummy Gun Run
D&T dummy Run for Add Perfs
Pull and Replace Pump
Pull 4.5" Pump
Pull Plug
Initial GLD
D&T/SBHP
Open C-sand
Open C3,4 Sand
SBHP
Open C sand
Pull DGLV @' 7648', run jet pump & tbg stop
Jet Pump Inspection and nzle up size; LO SSSV
Open C Sand
SBHP & GLD
Pull HES ret. Patch; D&T for parrs
SBHP,state MIT -- Regulatory
State MIT -- Regulatory
72-hr PBU w/DHSIT & GLRD
Isa A Sand for C Sand SI Squeeze
Paraffin Cut & Tag fill
MI Injection Profile (tag&drift necessary)
MI Injection Profile
Close C sand
MI Injection Profile (tag&drift necessary)
MI Injection Profile (tag&drift necessary)
MI Injection Profile (tag&drift necessary)
MI Injection Profile (tag&drift necessary)
Memory IPROF (MI injection)
Changeout DGLV in Prod'n mandrel
MI IPROF
MI IPROF
Pre IPROF SL - tag/drift
Set Pannex Gauges / Run Jet Pump
72-hr PBU NO DHSIT; set on collar/tbg stop
CV Check
72 Hour PBU
Initial GLD
Close C Sand for sz-r
Close & Open C Sand for SZT
PM CV's
Open C sand
Pull BPI and Run BPI w two 1/4' ports
Pull ~Plug in TT, Pull DCR Run DV
Ann Comm-T x IA communication, failed MIT
Pulled & reran jet pump during 03/10 wellhead repair, rate down 3300 bpd!
In Progress
Ready
Wel died and waiting on scrape.
Ready
Ready
Ready
E 230DS36QL K85329
E 230DS10FL K85328
C 230DS10DG AK0105
E 230DS28ZL K85329
E 35TN2N8PF K85328
E 35TN2N8PF K85328
E 35TN2N8PF K85328
E 35TN2N8PF K85328
E 35TN2N8PF K85328
C 230DS10LG AK0144
E 230DS36FL K85327
E 230DS10CL K85329
E 230DS28AL K85329
E 230DS28XL K85330
E 25WSID6DL K85328
C 230DS10DG AK0121
C 230DS10DG AK0107
C 230DS10DG AK0102
E 25WS1D6EP K85328
E 25WS1D6DL K85328
C 230DS10LG AK0141
C 230DS10RG AK0086
E 230DS36GL K85327
Troubleshoot possible obstruction at 13460 pre Log/pad
Pull Replace sleeve Pending PWN Eval
Tag/Close C
CV PM CV's in Ground since 4/99
CV PM CV's in Ground since 2/99
Try to get ASAP, ready to convert to water; note 2N & 30 work
Increasing WC well dies-1700 BOPD when flowing
Ready Needs to be done by 3/31/01
Ready
IN PROGRESS
FCO'd to 13490 2/15
FCO'd to 14083 2/17
After Fca
Replace Worn Pump. Economics very favorable (ROR>100%) with run life of (
AFC for expense rig workover being written
Ready - Post rig
Well dying off-260 Gross Oil Benefit
Rig press reduction prep - oil rate is offset prod loss potential, wt'd
Tag & run HFCVs in post frac well
Needed for EaR/MI management E 230DS10GL K85329
Ready E 230DS28DI. K85327
After SBHP E 230DS28DL K85329
After EL set Eclipse packer & PT integrity E 230DS36GL K85328
erosional concerns E 230DS10RL K85329
Potential C Sand eval for jet pump E 230DS36HL K85329
After CTU Fca before well Is BaL. C. 230DS10LG AK0141
FP well & load backside for GL unloading later E 230DS36ML K85328
Ready - SBHP stop depths sent via Email E 230DS36QL K85329
Ready (no SBHP required, well is not SI) E 230DS36RL K85329
Eval damage, rate down 100 bopd; GLRD--Revlsed proc. E 230DS36OL K85327
Ready E 230DS28AL K85329
Ready E 35TN2NSPF K85328
Ready - need to complete by mid-May E 35TN2NINL K85327
Ready - need to complete by mid-May E 35TN2NSPF K85328
Data to evaluate drilling candidates. E 230DS28DL K85329
Ready - need to complete by mid-May E 35TN2N1NL K85327
Ready - need to complete by mid-May E 35TN2N1NL K85327
Ready - need to complete by mid-May E 35TN2N1NL K85327
Ready - need to complete by mid-May E 35TN2NINL K85327
On MI now; gauge & tag probably needed. E 230DS36OL K85327
Leaking DGLV found in 1/13 log E 230DS10RL K85329
Ready E 230DS28UL K85327
Ready E 230DS28XL K85327
Ready - need prior to water conversion. E 230DS28UL K85327
Jet Pump must be in well by 04/01due to MI strategy on 2V drillsite. E 230DS28VL K85328
Ready, evaluating skin for 4Q01 wa, corkscrewed tbg E 230DS36NL K85327
Ready, do in conjunction with 2W-13 PBU E 230DS28WL K85329
Ready E 230DS28WL K85327
Declining GaR - Well ready for Gas lift E 230DS10CL K85329
reservoir surveillance E 230DS36HL K85327
Pull TPC/wait for 1 week (for SZT) / Rerun TPC E 230DS10AL K85327
asset preservation - erosion seen in past 9/99 E 230DS10AL K85328
Needed for WF mgmt E 230DS10BL K85329
3/14-21/01 E 230DS10BL K85329
Need Proc; Rig Expected c. 3/26 C 230DS10BG AK0158
C 230DS10DG AK0094
E 230DS10FL K85329
E 230DS10FL K85329
E 230DS10GL K85328
E 230DS10GL K85328
· KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page I of 4
GREATER KUPARUK ENGINEERING WELL WORK PRIORITY
Type
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
$
S
S
S
$
$
S
S
$
$
S
$
S
$
$
S
S
S
S
$
$
S
S
S
$
$
$
$
S
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
DS WL
1G -15
1G -17
1H -06
1H -08
1H -11
1H -15
1H -16
1J -03
1J -03
1L -14
1L -28
1R -09
1R -12
1R -26
1Y-04
1Y -31
1Y -32
2A -06
2A -15
2A -15
2B -02
2B -03
2C -03
2D -06B
2G -14
2H -04
2H -05
2K -09
2M -13
2M -17
2T -15
2U -04
2V -02
2Z -15
2Z -19
3A -05
3A 47
3B -14
3C -13
3G -07
3G-17
3H -01
3H -18
3H -26
3J -03
3J -06
3.1-17
3K -23
3M -01
3M -08
3N -16
30 -10
3Q -10
3Q -11
1D -06
1E -20
1E -21
1F -01
1F -16
1H -15
lQ -15
2A -11
2B -07
2B -10
2B -10
2C -04
2C -13
2M -30
2M -31
2N -329
2T -209
BOPD PR
50
150
500
5O0
25
i 50
i
i
100
50
D, 800
25
o
D,T
30
i
150
A 25
20
i
50
i
5O
5O
i
20
i
200
2O0
i
i
i
D,T
Work Description
Initial GLD
Drift with Dummy Straddle
Run Plug and MITT
SBHP (4 day SI needed)
D&T for Opportunity DEFT/PPROF
D&T for Opportunity DEFT/PPROF
SBHP (1 day SI needed)
Post Rig Pull DCR/Run DV
Dummy Gun run 20'x2.5'
D&T for IPROF
Install GLD
SBHP
CV Check
C sand AVA PM. D&T pre IPROF
Inspect CV's & AVA
tag tt plug gage tubing
Install GLD and tag
SI C-sand
Open C Sand
Open C Sand
Install GLD
Tag Fill
Pre IPROF SL - tag/drift
SBHP
Pull and re-run DV's
SBHP on injector
Tag Fill/Get Sample
New GLD
48 Hour PBU w/DHSIT
Tag/Drift & MI Injection Profile
Open C Sand / SBHP
Pre Patch SL
Pre IPROF SL - tag/drift
Erosion/scale CV check
Shut-In C Sand
Lock Out SSSV
Gauge & Tag
48-hr PBU
Tag & PBU w/DHSIT
GLRD for rate
D&T
PDS multi-finger caliper
Troubleshoot injector tubing x 7" ann comm
Deepen GLV design
GLRD
GLRD for maintenance
GLRD
Drift for scale
Gauge & Tag; dummy gun run
GLRD (move OV uphole)
Gauge & Tag / Inspect Production CVs
Lock Out SSSV
PBU w/DHSIT
GLRD for rate
Lock Out SSSV
Run Gas Lift Design
CV PM
Continue Fishing (post-video log)
Run tbg plug for Alt MIT
Run WRDP after PPROF
Tag & SBHP -
GLD for A-sand production
Close C sand
MI Injection Profile
Close C sand
Tag & Gauge / MI IPROF Memory Log
SBHP Opportunity Work
MI Injection Profile
MI Injection Profile
SBHP with a tag&drift
Tag Fill
Comments/Status.ri3 ming
Ready
will need SI
OK to tag while SI - but has WRDP
Opportunity pressure
Ready
Ready
Be aware of cement sheath 6000-6130'
JT freezing effect across choke with current OV
SI injector - Want to BOL after SBHP
after scale hydroblast
Last PM 2/99, combine with IPRF D&T
Last cv inspec 7/98
Eval ability to pull plug from 'Ir - History of bad Csd scale
ready
Ready after IPROF
Ready
After Water Flow Log
Ready
Ready
Ready
Ready; data for MI management
Ann Corem; T x IA comm, prep for MI injection
Ready, well is SI
Ready
Ready
Ready
On PWI.
Ready
Ready
Ready
Ready
Ready- CTU mill complete.
Check with PE if well is ready.
Ready; well acts plugged; think FP went away; need for pre-ML planning
Opportunity pressure
Opportunity pressure, last PBU done 5 yrs ago
Well not on OV due to bad unloading valve. **Revised procedural
For PPROF, etc.
Determine extent of scale deposition for remedial action
Ready; not a wellhead problem; need to resolve ASAP due to MI @ 3H
Move OV from stn #1 to stn #2.
Ready
Big slugger, difficult to test well
Ready
Ready. rate down slightly; recent scale treatment
Pre-C Sand peris
Ready - Need for accurate welltests, phase is erratic w/slugging
Way overdue for inspection...
Well wagged from MI to water injection, ready
Ready; opportunity pressure
post -GLS analysis
Complete prior to RIH with any tools
Need Proc;wait results of scale treat
CV's in Ground since 2/98 SI w/Derated flowline 1/26101
Pending Video, fishing tools
after PPROF
Has Ice plug
On hold as C-sand is open& no lift gas required
Ready
On PWI.
On hold per Mushovic/Dobson
On PWl, Choke Well to 6000 MCFD for 7 Days Prior to Logging
Ready after 9/24
On PWl. Evaluating injectivity and possible plugging damage
On PWI,Evaluating tubing restrictions
Well currently on production and waiting for final SI
Do Work Next Time Pump is Down
3/27/01 2:24 PM
Property
Charge Code
E 230DS10GL K85328
E 230DS10GL K85235
E 230DS10HL K85329
E 230DS10HL K85327
E 230DS10HL K85327
E 230DS10HL K85327
E 230DS10HL K85327
C 230DS10JG AK0147
C 230DS10JG AK0147
E 230DS10LL K85327
E 230DS10LL K85329
E 230DS10RL K85327
E 230DS10RL K85329
E 230DS10RL K85329
E 230DS10YL K85329
E 230DS10YL K85329
E 230DS10YL K85328
E 230DS28AL K85327
E 230DS28AL K85329
E 230DS28AL K85329
E 230DS28BL K85329
E 230DS28BL K85329
E 230DS28CL K85327
E 230DS28GL K85329
E 230DS28HL K85329
E 230DS28HL K85329
E 230D$28KL K85329
E 230DS28ML K85327
E 230DS28ML K85327
E 230DS28TL K85329
E 230DS28UL K85329
E 230DS28VL K85327
E 230DS28ZL K85329
E 230DS28ZL K85329
E 230DS36AL K85329
E 230DS36AL K85329
E 230DS36BL K85327
E 230DS36CL K85327
E 230DS36GL K85328
E 230DS36GL K85327
E 230DS36HL K85329
E 230DS36HL K85329
E 230DS36HL K85328
E 230DS36JL K85329
E 230DS36JL K85329
E 230DS36JL K85329
E 230DS36KL K85329
E 230DS36ML K85328
E 230DS36ML K85329
E 230DS36NL K85329
E 230DS36OL K85329
E230DS36QL K85327
E 230DS36QL K85328
E 230DS10DL K85329
E 230DS10EL K85328
E 230DS10GL K85328
E 230DS10FL K85329
E 230DS10FL K85329
E 230DS10HL K85327
E 230DS10QL K85329
E 230DS28AL K85329
E 230DS28BL K85329
E 230DS28BL K85327
E 230DS28BL K85329
E 230DS28CL K85327
E 230DS28CL K85327
E 230DS28ML K85327
E 230DS28ML K85327
E 35TN2N1NL K85327
E 38TB2T6CL K85329
· KEY; S=SLICKUNE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, St3, £P, CP, OP, TP=PENDING WORK P°ge 2 of 4
GREATER KUPARUK ENGINEERING WELL WORK PRIORIIY ~'
I Type DS WL BOPD PR Ste~Work Description
SP 3B -05 i
SP 3B -07 i
SP 3F -05 100
SP 3H -01 20
SP 3H -12 i
SP 30 -12 i
SP 3Q -02
PFO w/downhole gauges In conjunction w/pre-MI pressure reduction in spring 2001
PFO w/downhole gauges In conjunction w/pre-MI pressure reduction in spring 2001
Set Baker K-3 Packoff across hole in tubing Waiting for -20 degrees to fill 7' annulus with cold diesel
2 GLRD for rate On hold pending scale determination
Lock Out SSSV ancVor seal cont'l line leak SSSV not locked out; can't keep panel pressured; chk'ing PWS sol'n
Memory IPROF Need tag; well currently on water due to wellhead integrity prob.
Memory IPROF (MI injection) On water now; gauge & tag & set frac sleeve probably needed
3/27/01 2:24 PM
CosI Property 1AFC
CodtCharge Co ,de
E 230DS36BL K85327
E 230DS36BL K85327
E 230DS36FL K85329
E 230DS36HL K85329
E 230DS36HL K85329
E 230DS36OL K85327
E 230DS36QL K85327
E-UNE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EP
EP
EP
EP
EP
EP
EP
1D -30 300
3Q -15 i SE
30 -19 i T
1D -32 i 200
1D -38 i 200
1D -39 i 200
1 R -29
1D -40 A 200
1 D -34 200
2N -323 T
2N-337 A T
2X -18 200
3G-14 A 150
3M -24 100
3M -01 50
1 D -121
1 D -135
1L -14
2V -03
2U -14
30 -05
3,J -16
1Y -22
2U -04
1F -01 200
1H -11
1H -15
1 Q -23
1 R -26
2A -06
2C -03
2D -13
2V -02
2X -01
3G -17
1 D -102
1 D -124
1 D -140
2L -317 A T
3A -15 i
3F-21 i N~wW~
3F-21 i N~W~
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2 Add Parrs
2 LDL for tubing leak. LLR 0.5 BPM
1 Re-run IBP for AOGCC Mm'
2 CBL & Perforate 13804-13944, SBHP
2 CBL and Perf 13955-14000, SBHP
2 CBL and Parr, SBHP
4 Cut Tubing
1 Perforate 10900-10944', SBHP
3 Add Pads
Cement Bond Log
Cement Bond Log
FBHP & Gas Lift Survey
Video Log
2 SBHP/CH GR/Add-peds/SBHP/rerun patch
2 Initial perf of C Sands
FBHP/Temp Survey on a live ESP
FBHP/Temp Survey on a live ESP
2 IPROF after D&T
Waterflow Log
2 PW IPROF
IPROF (SWl)
IPROF (Tag good- ok to log, PWI)
Opportunity PPROF / GLS
2 Set tubing patch
2 Run Video Log of fish
2 PPROF/GLS/ DEFT
2 Opportunity PPROF / GLS / DEFT
2 Opportunity PPROF / GLS
2 IPROF after D&T
2 PW IPROF
2 PW IPROF
2 PPROF
2 PW IPROF
PW IPROF
2 PPROF w/pass DEFT, GLS/FBHP
FBHP/Temp Survey on a live ESP
FBHP/Temp Survey on a live ESP
FBHP/Temp Survey on a live ESP
CBI_/Perf/ISBHP
Opportunity IPROF (SWI)
2 SCMT (post CTU cml sqz)'
3 Perf New Injector & Initial SBHP (post SCMT)
tagged 11824 11/9 C
Ann Comm-T x IA communication, failed MIT. Water injector. E
SL pulled previous IBP -- check w/PWS for final plan E
After Dummy run revised depths C
drift to 13460 3/10 FCO'd to 14252 2/16; revised depths C
after dummy run C
After sand plug - needed for dHIIng C
SCMT tag 11034 3/10 C
After Dummy run/after Fca C
Need to complete in prep for WAMI conversion. E
Need to complete in prep for WAMI conversion. E
Evaluate well for sudace powered jet pump E
tag @ 7129' (top A perf) - OK Flog; suspected casing damage E
After SL prep E
After D & T E
Well is already equipped with gas meter, ready. E
Well is already equipped with gas meter, ready. E
Be aware of cement sheath 6000-6130' E
Evaluate intra C-sand injection for profile mod E
Ready E
Ready; should not need tag E
Tag'd @ 8611' on 2/4/01 - no Fca but want splits between A3/A2 E
Ready - tagged 12/11 - ensure well is online before scheduling E
Need pre patch SL work first E
Attempt #3 - after Fca and SL work E
after D &T-well changes WC after being on line E
Need one week notice to BOL E
Tag 9333 12/9 will need Fca E
opportunity work E
Ready E
Ready after SL tag/drift E
Ready after SL tag E
Ready E
Ready After Water Injection Restored/Flowline repairs underway E
Aft D&T. Call PE if DEFT is not free to confirm running; opp. GLS & FBHP E
Needed for ESP & heat-trace studies, waiting on metering E
Needed for ESP & heat-trace studies for upcoming development E
Needed for ESP & heat-trace studies, waiting on metering E
Reviewing casing re-cement work. C
Well currently SI for pressure reduction; engineer will notify E
SCMT 3-5-01: poor bond between A&C sand post rig C
pending CTU cmt job results - SCMT. Surface work started 3/1. C
230DS10DG AK0096
230DS36QL K85329
230DS36OL K85329
230DS10DG AK0107
230DS10DG AK0094
230DS10DG AK0121
230DS10RG AK0159
230DS10DG AK0129
230DS10DG AK0102
35TN2N1NL K85327
35TN2N1 NL K85327
230DS28XL K85327
230DS36GL K85329
230DS36ML K85328
230DS36ML K85328
25WS1D6EP K85327
25WS1D6EP K85327
230DS10LL K85327
230DS28VL K85327
230DS28UL K85327
230DS36OL K85327
230DS36JL K85327
230DS10YL K85327
230DS28UL K85329
230DS10FL K85329
230DS10HL K85327
230DS10HL K85327
230DS10QL K85329
230DS10RL K85327
230DS28AL K85327
230DS28CL K85327
230DS28DL K85328
230DS28VL k85327
230DS28XL K85327
230DS36GL K85327
25WS1D6EP K85327
25WS1D6EP K85327
25WSID6EP K85327
35TN2N8NG AK0070
230DS36AL K85327
230DS36FO AK0135
230DS36FO AK0135
CTU
3F -13 A 280 I Pull/rerun C Sand isa sleeve
1D -34 200 2 1 Fca for Add perfs
1F -01 200 3 1 Fca fill from Fish and reverse out with filtered SW
1L-11 300 4 2 FCOPostRig
2N -335 300 5 Fill Cleanout
1L -09 200 6 1 Post Rig Fca fill from TT plug
1L-09 200 7 3 Post Rig Fca
1F -18 100 9 Fca
2A -13 10 2 Pre Workover Hydroblast Scale
1L -10 i 11 Post Rig work Fca Mud and hard fill
1L-20 a 100 12 Fca
lQ -23 50 13 1 Fca (pre PPROF)
1R-12 50 14 1 Hydroblast Scale
3M -03 20 15 Fca
Attempted set on 03/17; WT & FTT show C Sand still open
Pre perf Fca
Check w/PWS may have tree leak, May need to pump heavy fluid to get on wE
need proc
Ready
30' fill on 'rr plug
After pull Plug in X nipple - Min ID 1.875"
Ready, Fill covering A Sand perfs - also pre PPROF
Need For prerig workover by 03/30
Ready, Fill covering A sand perfs - also pre PPROF
Tag'd fill over A1 sands @ 7805' on 1/20/01
E 230DS36FL K85329
C 230DS10DG AK0102
E 230DS10FL K85329
C 230DS10LG AK0144
E 35TN2N1NL K85328
C 230DS10LG AK0141
C 230DS10LG AK0141
E 230DS10FL K85328
E 230DS28AL K85328
C 230DS10LG AK0143
E 230DS10LL K85328
E 230DS10QL K85329
E 230DS10RL K85329
E 230DS36ML K85328
· KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 3 of 4
GREATER KUPARUK ENGINEERING WELL WORK PRIORIIY LI~ ·
Type DS WL
C 1J .03
C 3H -11
CP 1D -37
CP 2L-317 A
CP lB -14
CP 2D .03 220
CP 2L -325 350
CP 2N .341 500
CP 3F-21 i
CP 3J -07 455
!
BOPD PR Stel~Work Description
500 16 2 FCO11.1ppg mud Post Rig
600 17 ECT Repair WO with Coil Platform
500 2 FCO
T Cement squeeze
2 FCO Post Rig WO
1 Remove Coil Velocity String
Xylene washJsoak
Fill Cleanout
1 Post dg cement sqz to isolate A & C sand
FCO in prep for WO/ST
OTHER WORK
O 1 R -29
OP 1D -32 i 200
OP 1D-38 I 20O
OP 1D-39 I 200
OP 1D-40 A 200
OP 3H-17 i 500
2 Pump Sand Plug
3 HPBD
3 HPBD
3 HPBD
2 HPBD
A- Sand HPBD
CPF1 SCALE TREATMENTS
T1 lA -19
T1 1G -13
T1 lC .04
T1 1Y -23
T1 1Y -19
T1P 1E -12
TIP 1Y -28
T1P 2Z -13
1 SI-4004 Treatment A/C
2 SI-4004 Treatment A/C
3 SI-4004 Treatment C
4 SI-4004 Treatment A
5 SI-4004 Treatment A
SI-4004 Treatment
SI-4004 Treatment A/C
SI-4004 Treatment
CPF2 SCALE TREATMENTS
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2
T2P
T2P
2T -21
2C -16
2A .05
2D -12
2K .09
2M .07
2M -11
2M -13
2M -32
2T -03
2T -17
2V -09
2W -01
2A -12
2T -37
1
2
3
4
5 2
6
7
8
9
10
11
12
13
2
2
SI-4004 Treatment
SI-4004 Treatment.
SI-4004 Treatment A/C
SI-4004 Treatment A
SI.4004 Treatment - A sd
SI-4004 Treatment A
S1~4004 Treatment A/C
SI-4004 Treatment
SI-4004 Treatment
S1~4004 Treatment A/C
SI-4004 Treatment A/C
Sl-4004 Treatment A/C
SI-4004 Treatment A/C
SI-4004 Treatment C
Sl-4004 Treatment A/C
CPF3SCALETREATMENTS
T3 3F -05
T3 3F -06
T3 3M -23
T3 3N -09
T3 3C -11
T3 3C -15
T3 3G -18
T3 3G -21
T3 3G -22
T3 3A -05
T3 3F -02
T3 3F-10
T3 3H -23
T3 31-05
T3 3J -19
T3 3Q -11
T3 3Q -22
T3 3R -19
T3P 3F -13
T3P 3H -01
T3P 3N -14
SI-4004 SS-5206
25 3
17 2
6 1
4 1
7 1
18 2
31 3
10 1
SI-4004 SS-5206
Comments/Status/Timing
Ready
Timing unknown, need to be ready anytime
2nd FCO Post Frac - Warranty work pending GLD results
SCMT showed poor cement integrity.
Need Proc; Rig Expected c. 3/28
Waiting for current coil tubing to 'mile' out.
Evaluating cleanout option.
Evaluating cleanout options using xylene.
SCMT 3-5-01: poor bond between A&C sand post rig - need procedure
Fill found to 1463' MD; waiting on ST plan to procede
Needed for Drilling after SL work
Need Proc; After Injectlvity test
Need Proc; After Injectivlty test
Need Proc
Need Proc; After Injectlvity test
Tried 'poor boy' HPBD; still reviewing results per DSE 2/19/01.
PPM BBLS/DRUM
Ready 6 98500
Ready 10 105500
Ready 12 104200
Ready 7 110600
Ready 7 107800
Well SI 7 37800
Hold until well is RTF; approx 10/01 8 118500
Hold until well is RTF 6 122800
5 1 Ready
25 3 Ready
20 2 Ready
4 1 Ready
2 1 Ready; FCO complete 02/20
5 1 Ready
4 I Ready
2 I Ready
2 1 Ready
2 1 Ready
14 I Ready
23 2 Ready
33 3 Ready
9 I Post A sand lsolation
3 1 Post Gauge & Tag
SI-4004 SS-5206
PPM BBLS/DRUM
6 196200
6 89600
7 103300
7 109800
5 86300
7 105600
8 123400
6 71900
6 79700
7 118400
7 115400
8 110500
7 105500
7 126100
7 115200
PPM BBLS/DRUM
I SI-4004 Treatment A/C 20 2 Ready 6
2 SI.4004 Treatment A/C 18 2 Ready 7
3 Sl-4004 Treatment A/C 10 1 Ready; Fill across Perf's 5
4 SI-4004 Treatment AJC 8 1 Ready; Fill across Perf's 7
5 SI-4004 Treatment A/C 2 I Wellwork completed, ready for treatment
6 SI.4004 Treatment C 3 1 Ready 6
7 SI.4004 Treatment A/C 3 1 Ready 6
A 8 Sl-4004 Treatment A 2 1 Ready 6
9 SI-4004 Treatment A 4 I Ready 6
10 SI-4004 Treatment A/C 3 1 Ready; Lock out SSSV? 6
11 SI-4004 Treatment A/C ,20 2 Ready; has jet pump in well 6
12 SI-4004 Treatment A/C 23 2 Ready; has jet pump in well 7
13 SI-4004 Treatment A 2 I Ready 6
14 SI.4004 Treatment A 2 1 Ready 6
16 Sl-4004 Treatment A 2 I Ready; Fill across Perf's 6
16 SI-4004 Treatment A 4 1 Ready 6
17 SI-4004 Treatment A 2 I Ready 6
18 SI.4004 Treatment A 7 1 Ready 6
A SI.4004 Treatment A/C 12 1 Closed C Sand before sqz could happen 5
SI-4004 Treatment - C only 13 1 A sand producing, check residuals 1st. F 7
SI-4004 Treatment A 6 1 Flow well for 30 days to reduce BHP
Sum of Scale Treatments Sl-4004 bbls= 437 60 =bbls SS-5206
108,000
197,200
102,000
137,200
10,100
140,100
137,000
68,000
111,700
96,600
80,900
105,900
43,800
102,100
39,400
113,100
30,000
102,200
99,400
36,400
101,800
3/27/01 2:24 PM
Cos~Property ~AFC
Cod{Charge Code
C 230DS10JG AK0147
E 230DS36HO 999556
C 230DS10DG AK0123
C 35TN2N8NG AK0070
C 230DS10BG AK0158
E 230DS28DL K85328
E 35TN2L1LL K85328
E 35TN2N1NL K85328
C 230DS36FO AK0135
E 230DS36JL K85329
C 230DS10RG AK0159
C 230DS10DG AK0107
C 230DS10DG AK0094
C 230DS10DG AK0121
C 230DS10DG AK0129
E 230DS36HG 999438
E 230DS10AL K85328
E 230DS10GL K85328
E 230DS10CL K85328
E 230DS10YL K85328
E 230DS10YL K85328
E 230DS10EL K85328
E 230DS10YL K85328
E 230DS28ZL K85328
E 230DS28TL K85328
E 230DS28CL K85328
E 230DS28AL K85328
E 230DS28DL K85328
E 230DS28KL K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28TL K85328
E 230DS28TL K85328
E 230DS28VL K85328
E 230DS28WL K85328
E 230DS28AL K85328
E 230DS28TL K85328
E 230DS36FL K85328
E 230DS36FL K85328
E 230DS36ML K85328
E 230DS36NL K85328
E 230DS36CL K85328
E 230DS36CL K85328
E 230DS36GL K85328
E 230DS36GL K85328
E 230DS36GL K85328
E 230DS36AL K85328
E 230DS36FL K85328
E 230DS36FL K85328
E 230DS36HL K85328
E 230DS361L K85328
E 230DS36JL K85328
E 230DS36QL K85328
E 230DS36QL K85328
E 230DS36RL K85328
E 230DS36FL K85328
E 230DS36HL K85328
E 230DS36NL K85328
· KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Pctge 4 of 4
I Type
.,
GRE, ATER KUPARUK ENGINEERING WELL WORK PRIORI~
DS WL
NOB PR SteplWork Description
Comments/Status/Timing
3/27/01 2:25 PM
ICost I Pr°pert7
CodeICharge Code
ICost Codes:
C= Capital
E= Expense
IAFC
SLICKLINE
CD2 -35 1 Drift, tag, pull gauges, SBHP
CD1 -17 2 Pull SPM gauges poststartup
CD1 -03 3 Ddft, tag, SBHP
CD1 -04 3 Pull SPM gauges poststartup
CD1 -10 3 Pull SPM gauges poststartup
CD1 -22 A 3 Pull SPM gauges poststartup
CD1 NQ1 3 Drift, tag PBU
WD -02 3 SSSV post MIT
Alp -01 B 4 Prep for observation gauges
Berg -02 A 4 Pull gauges for pulse test
Berg -02 A 4 Prep for observation gauges
CD1 -19 A Drift, tag, SBHP
E-LINE
CD1 -26 2 WFL
Alp -01 A 4 Run observation gauges
Alp -01 A 4 Clean out for obs gauges
Berg -02 A 4 Run observation gauges
CTU
CD1-10 I Memory spinner log
CD1 -24 I Memory spinner log
CD1 -25 1 Memory spinner log
CD1 -27 1 Memory spinner log
CD1 -30 I Memory spinner log
OTHER WORK
CD1 -21
CD1 -16
CD1 -23
CD1 -25
CD1 -27
CD1 -38
CD1 -43
CD1 -44
Needs wellhead dug out
Ready after 12/15
Repeat of recent SBHP
Ready after 12/15
Ready after 12/15
Ready after 12/15
Hold till end of March
Annual MIT
Ready after 3/1/2001
Ready after 3/1/2001
Ready after 3/1/2001
Ready after 3/2
Combo with SCMT jobs
Ready after 3/1/2001
Ready after 3/1/2001
Ready after 3/1/2001
Ready after 3/5
Ready after 3/5
Ready after 3/5
Ready after 3/5
Ready after 3/5
3 Flowback injection well prestartup Ready after 1/29
4 Flowback injection well prestartup Ready after 10/30
4 Flowback injection well prestartup Ready after 10/30
4 Arctic pack OA Ready in late March
4 Arctic pack OA Ready in late March
4 Arctic pack OA Ready in late March
4 Arctic pack OA Ready in late March
4 Arctic pack OA Ready in late March
C NKALPN4OT
C NKALPN4OT
E 3ACD016DH
C NKALPN4OT
C NKALPN4OT
C NKALPN4OT
C ASGENR3GN
C NKALPN4OT
C NKALPN4OT
C NKALPN4OT
C NKALPN4OT
E 3ACD016DH
C NKALPN4OT
C NKALPN4OT
C NKALPN4OT
C NKALPN4OT
E 3ACD016DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACDO16DH
E 3ACD016DH
C NKALPN4OT
C NKALPN4OT
C NKALPN4OT
E 3ACDO16DH
E 3ACD016DH
E 3ACD016DH
E 3ACDO16DH
E 3ACDO16DH
998W05
998W05
B00327
998W05
998W05
998W05
ASD003
3ACD016
998W01
998W02
998W02
B00327
998B15
998W01
998W01
998W02
B00327
B00327
B00327
B00327
B00327
998D01
998W05
998W05
B00329
B00329
B00329
B00329
B00329
* KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK. T=SCALE TREATMENTS, SP. EP. CP, OP, TP=PENDING WORK Poge 1 of 1
~PHILLIPS Alaska, Inc.
A Subsl~liary of PHILLIPS PETROLEI.~Vl COMPANY
Steve Bradley
Well Operations Supervisor
Kuparuk Production
NSK-69
Phone: 659-7348
Fax: 659-7314
February 19, 2001
Mr. Daniel Seamount, Chairman
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Dear Mr. Seamount:
Attached is a listing of upcoming operations in the Kuparuk and Alpine Fields.
This listing is provided as required under the terms
If additional data or scheduling information is needed, please call.
Sincerely,
Well Operations Supervisor
Attachments
cc: File: F^R 021902, AIO 370
WWPL 3.14
Phillips Alaska. Inc. is a Subsidiary of Phillips Petroleum Company
GREATER KUPARUK ENGINEERING WELL WORK PRIORI~
2/19/01 4:36 PM
Type DS WL
BOPD PR StelWork Description
Commente/Statue/Timing
CosI Property [
Codt Charge Code AFC
Cost Codes:
C= Capital
E= Expense
SLICKUNE
1L -10 1
2U -12 800 2
1 D -129 300 3
3N-14 280,SE 4 1
1 B -13 225 5
lA -15 100 6
1 E -07 200 7
1F -20 200 8 1
2N -314 T 9
2N-337 A 250 10
2N -339 200 11
1D -113 180 12
2L-321 T, 150 13
3F -02 100 14
2W -06 100 15 2
2U -14 16 1
2W -13 T 17
2V -02 18 1
2W -10 19
3Q -21 i T 20
3R -25 i T 21
30 -19 I T 22
1D -37 300 23 1
lA -06 i 200 24 1
1R -01 B 110 25
1D -36 200 26
3G -05 150 27 1
1R -05 100 28
lB -O5 i A 29 1
3F -01 150 30
3G-14 A 135 31 2
3H -03 100 32
1R -20 100 33
3M -24 100 34 1
30 -04 100 35
2C -03 36 1
2M -13 37
3C -06 50 38
3N -07 100 39
1D -105 60 4O 1
2U -O4 41 1
lA -18
lA -19
lB -04 50
lB -05 25 2
1D -01 190 4
1D -32 200 1
1D -32 200 3
1D -32 200 5
1D -37 200 3
1D -37 200 5
1D -38 200 1
1D -38 200 3
1D -38 200 5
1D -39 200 1
1D -39 200 3
1D -39 200 5
1D -40 A 200 1
1 D -40 A 200 3
1 D -40 A 200 5
1 D -42 300 3
1 D -42 300 5
1 F -02
1 F -07 100
1F -20 284 2
1G -02
1 G -04 25
1G -07
Pre Rig Prep work
Pull TTP's, run new GL design (ANN COMM)
Pull and replace pump
Tag & sample solids for rate / check GLVs
D&T, Troubleshoot SSSV
Open C34 Sand
Close C sand; D&T
DHST PBU
Run DV
Paraffin Cut
Paraffin Cut
Replace SOV
Paraffin Cut
Pull DH gauges, inspect pump
Run Jet Pump
Pre IPROF SL - tag/drift
72 Hour PBU
Pre IPROF SL - tag/drift
CV Check
SBHP,state MIT
State MIT
Set TTP, MITT, Pull IBP for re-run
Pull SOV and run DV
Sep Zone A Sand SBHP
Initial GLD
Drift/Tag (rate loss > 1500 BOPD may be fill)
Drift w/dummy pump, set DGLV @ 7648'
Jet Pump Inspection and nzle up size; LO SSSV
Pull BCP and run BPI in AVA
Run jet pump & slip stop
Drift and tag (post-FCO / pre-Video)
Open C Sand
Changeout DGLV in Prod'n mandrel
Pull HES ret. Patch; D&T for peffs
72-hr PBU w/DHSIT & GLRD
Pre IPROF SL - tag/drift
48 Hour PBU w/DHSIT
Close C Sand for SZT
72-hr PBU NO DHSIT; set on collar/tbg stop
Drift and Tag/Check SOV
Pre Patch SL
Close & Open C Sand for SZT
PM CV's
Open C sand
Pull BPI and Run BPI w two 1/4" ports
Run LGLV's; Pull Frac sleeve
Pull SOV and run DV
Dummy Gun run 20'x2.5"
Post perf SBHP
Dummy Gun run 20'x2.5"
Post perf SBHP - ok to do with Eline after Peds
Need Proc Pre Rig exp 2/24
Need GL design after weld job
in progress
Well plugged choke and stopped flowing 1/19 after inc. GL rate
Choke flow with one 3/16" port in a BPI
shuts off water
Needed for Frac or development analysis - reserves at risk
New Well. Ready
Schedule in conjuction with DHD work -2/20/01 (Pete/Jerry).
Ready
Tag completed 1/28. Pump is still down.
Schedule on 02/23, preparation for chemical squeeze
Ready to pull after 01/31; gauges needed for 2W-06
Run one week after pressure bombs are set
Ready
Ready
Ready
Ready, do in conjunction with 2W-13 PBU
Ready - SBHP stop depths sent via Email
Ready (no SBHP required, well is not SI)
READY -MITT failed, MITIA passed on 2/14.
Facility ready Mar 3rd
Inj SI for P reduction - Need before BOL (ready)
Well dying off 260 Gross Oil Benefit
ready
2.75" x 15' drift, verify ability to pull/set DGLV w/pkr set below mandrel
erosional concerns
BPC been in ground since 96 - erosional concerns
Jet pump at Y-pad
Potential C Sand eval for jet pump
Leaking DGLV found in 1/13 log
FP well & load backside for GL unloading later
Eval damage, rate down 100 bopd; GLRD--Revised proc.
Ready
Ready
reservoir surveillance
Ready, evaluating skin for 4Q01 WO, corkscrewed tbg
Trouble shoot pump, pre Eline leak detect log
Ready
Pull TPC/wait for 1 week (for SZT) / Rerun TPC
asset preservation - erosion seen in past 9/99
Needed for WF mgmt
1-2 weeks after A sand is opened
ready
After FCO
After peals
After FCO
After perfs
Post Drill rig Replace SOV with DV (pre FCO/perf) no scafolding set on 2/11
Dummy Gun run 20'x2.5" After FCO
Post perf SBHP After perfs
Post Drilling work SCMT, Perf, and HPBD No scafolding 2/11- WWR out 2/12/01
Dummy Gun run 20'x2.5" After FCO
Post perf SBHP After perfs
Pull SOV and run DV ready
Dummy Gun run 20'x2.5" After FCO
Post perf SBHP After perfs
Dummy Gun run 20'x2.5" After FCO
Post perf SBHP After perfs
Pull Replace sleeve Pending PWN Eval
Tag/Close C
Pull Gages & DHST 5 days after gages are set
CV PM CV's in Ground since 4/99
Open C3,4 Sand Needed for EOR/MI management
CV PM CV's in Ground since 2/99
E 230DS28UL K85329
E 25WSID6DL K85328
E 230DS36NL K85329
E 230DS10BL K85328
E 230DS10AL K85329
E 230DS10EL K85329
E 230DS10FL K85327
C 35TN2N8NG AKOO69
E 35TN2N8PF K85328
E 35TN2NSPF K85328
E 25WSID6DL K85328
E 35TN2L1PF K85328
E 230DS36FL K85328
E 230DS28WL K85327
E 230DS28UL K85327
E 230DS28WL K85327
E 230DS28VL K85327
E 230DS28WL K85329
E 230DS36QL K85329
E 230DS36RL K85329
E 230DS36OL K85329
C 230DS10DG AKO123
E 230DS10AL K85327
C 230DS10RG AKO086
E 230DS10DL K85329
C 230DS36GL ??????
E 230DSlORL K85329
E 230DS10BL K85329
E 230DS36FL K85328
E 230DS36GL K85329
E 230DS36HL K85329
E 230DS10RL K85329
E 230DS36ML K85328
E 230DS36OL K85327
E 230DS28CL K85327
E 230DS28ML K85327
E 230DS36HL K85327
E 230DS36NL K85327
E 25WS1D6DL K85329
E 230DS28UL K85329
E 230DS10AL K85327
E 230DS10AL K85328
E 230DS10BL K85329
E 230DS10BL K85329
E 230DS10DL 999545
C 230DS10DG AK0107
C 230DS10DG AK0107
C 230DS10DG AK0107
C 230DS10DG AK0123
C 230DS10DG AK0123
C 230DS10DG AKOO94
C 230DS10DG AKO094
C 230DS10DG AK0094
C 230DS10DG AK0121
C 230DS10DG AK0121
C 230DS10DG AK0121
C 230DS10DG AK0129
C 230DS10DG AK0129
C 230DS10DG AK0129
C 230DS10DG AK0105
C 230DS10DG AK0105
E 230DS10FL K85329
230DS10FL K85327
E 230DS10GL K85328
E 230DS10GL K85329
E 230DS10GL K85328
* KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Pekoe 1 of 4
GREATER
I Type DS WL
S 1G -15
S 1G -17
S 1H -02
S 1H -06
S 1H -O8
S 1H -11
S 1H -16
S 1 L -26
S 1 L -28
S 1R -09
S 1R -12
S 1 R -26
S 1Y-04
S 1Y -17
S 1Y -31
S 1Y -32
S 2A -15
S 2B -02
S 2B -03
S 2D -08
S 2H -04
S 2K -09
S 2M -17
S 2T -15
S 2Z -15
S 2Z -19
S 3A -05
S 3A -17
S 3B -14
S 3C -13
S 3G -05
S 3G -07
S 3H -01
S 3H -12
S 3H -18
S 3J -03
S 3J -06
S 3J -17
S 3K .23
S 3N -16
S 30 -16
S 3Q -02
S 3Q -10
SP 1D -06
SP 1E -21
SP 1F -01
SP 1F -16
SP 1H -01
SP lQ -15
SP 2A -11
SP 2B -07
SP 2B -10
SP 2B -10
SP 2C -04
SP 2C -13
SP 2M -30
SP 2M -31
SP 2T -209
SP 3B -05
SP 3B -07
SP 3F -05
SP 3F -15
SP 3H -01
SP 30 -10
SP 30 -12
KUPARUK ENGINEERING WELL WORK PRIORIJJ'
/
BOPD PR StelWork Description
50
150
600 1
200
100
50
150
A 25
20
50
A
2OO
75O
20O
100
20
Initial GLD
Drift with Dummy Straddle
Pull RHC c/o RP shear
Run Plug and MI'FT
SBHP (4 day SI needed)
1 D&T for Opportunity DEFT/PPROF
SBHP (1 day SI needed)
Tag (Pre FCO)
Install GLD
SBHP
2 CV Check
C sand AVA PM
Inspect CV's & AVA
4 Post Frac GLV's
tag tt plug gage tubing
Install GLD and tag
2 Open C Sand
Install GLD
Tag Fill
1 Close C sand
SBHP on injector
1 New GLD
Tag/Drift & MI Injection Profile
Open C Sand / SBHP
Erosion/scale CV check
2 Shut-In C Sand
Lock Out SSSV
Gauge & Tag
48-hr PBU
Tag & PBU w/DHSIT
3 Pull DGLV @ 7648', run jet pump & tbg stop
GLRD for rate
1 PDS multi-finger caliper
Lock Out SSSV
Troubleshoot injector tubing x 7" ann comm
GLRD
GLRD for maintenance
GLRD
Ddft for scale
Gauge & Tag / Inspect Production CVs
Memory IPROF (MI injection)
Memory IPROF (MI injection)
PBU w/DHSIT
Lock Out SSSV
CV PM
3 Continue Fishing (post-video log)
Run tbg plug for Alt MIT
I Post Rig WO work
Tag & SBHP -
GLD for A-sand production
Close C sand
MI Injection Profile
Close C sand
Tag & Gauge / MI IPROF Memory Log
SBHP Opportunity Work
MI Injection Profile
MI Injection Profile
Tag Fill
PFO w/downhole gauges
PFO w/downhole gauges
Set Baker K-3 Packoff across hole in tubing
MI Injection Profile
2 GLRD for rate
Lock Out SSSV
Memory IPROF
E-LINE
Comments/Status/Timing
Ready 230DS10GL
230DS10GL
Need Proc Post Rig
will need SI
' 2/19/01 4:36 PM
Cos/ Properly AFC
Codt Charge Code
E K85328
E K85235
E 230DS10HL K85329
E 230DS10HL K85327
E 230DS10HL K85327
Opportunity pressure E 230DS10HL K85327
Well appears to have hydrated off
JT freezing effect across choke with current OV E 230DS10LL K85329
SI injector - Want to BOL after SBHP E 230DS10RL K85327
after scale hydroblast E 230DS10RL K85329
Choke sleeve in ground since 2/99 E 230DS10RL K85329
Last cv inspec 7/98 E 230DS10YL K85329
After FCO E 230DS10YL 999582
Eval ability to pull plug from TT - History of bad Csd scale E 230DS10YL K85329
ready E 230DS10YL K85328
After Water Flow Log E 230DS28AL K85329
Ready E 230DS28BL K85329
Ready E 230DS28BL K85329
Ready E 230DS28DL K85329
Ready, well is SI E 230DS28HL K85329
Ready E 230DS28KL K85329
On PWI. E 230DS28ML K85327
Ready E 230DS28TL K85329
Ready E 230DS28ZL K85329
1st. Attempt found Scale in well. CTU mill required. E 230DS28ZL K85329
Check with PE if well is ready. E 230DS36AL K85329
Ready; well acts plugged; think FP went away; need for pre-ML planning E 230DS36AL K85329
Opportunity pressure E 230DS36BL K85327
Opportunity pressure, last PBU done 5 yrs ago E 230DS36CL K85327
C 230DS36GL ??????
Well not on OV due to bad unloading valve. **Revised procedurei E 230DS36GL K85328
Determine extent of scale deposition for remedial action E 230DS36HL K85329
Cannot maintain pressure on hydraulic panel due to downhole leak E 230DS36HL K85329
Ready; not a wellhead problem E 230DS36HL K85329
Ready E 230DS36JL K85329
Big slugger, difficult to test well E 230DS36JL K85329
Ready E 230DS36JL K85329
Ready, rate down slightly; recent scale treatment E 230DS36KL K85329
Ready E 230DS36NL K85329
On MI now; gauge & tag probably needed E 230DS36OL K85327
On MI now; gauge & tag & set frac sleeve probably needed E 230DS36QL K85327
Ready; opportunity pressure E 230DS36QL K85327
Complete prior to RIH with any tools E 230DS10DL K85329
CV's in Ground since 2/98 SI w/Derated flowline 1/26/01 E 230DS10GL K85328
Pending Video, fishing tools E 230DS10FL K85329
E 230DS10FL K85329
Need Proc Post Rig exp 2/24
Has Ice plug E 230DS10QL K85329
On hold as C-sand is open & no lift gas required E 230DS28AL K85329
Ready E 230DS28BL K85329
On PWI. E 230DS28BL K85327
On hold per Mushovic/Dobson E 230DS28BL K85329
On PWl, Choke Well to 6000 MCFD for 7 Days Prior to Logging E 230DS28CL K85327
Ready after 9/24 E 230DS28CL K85327
On PWI, Evaluating injectivity and possible plugging damage E 230DS28ML K85327
On PWI,Evaluating tubing restrictions E 230DS28ML K85327
Do Work Next Time Pump is Down E 38TB2T6CL K85329
In conjunction w/pre-MI pressure reduction in spring 2001 E 230DS36BL K85327
In conjunction w/pre-MI pressure reduction in spring 2001 E 230DS36BL K85327
Waiting for -20 degrees to fill 7" annulus with cold diesel E 230DS36FL K85329
On water right now E 230DS36FL K85327
On hold pending scale determination E 230DS36HL K85329
Proceed after well wags from MI to water injection E 230DS36OL K85329
Need tag; well currently on water due to wellhead integrity prob. E 230DS36OL K85327
E 1Y -17 200 I 1 Perf A4
E 3F-21 i 2 1 SCMT (new injector)
E 3J -09 i 3 IPROF (PWI - need 6585')
E 3J -01 i 4 IPROF (PWI - need 9450')
E 2L-317 A T 5 2 CBL/Perf/ISBHP
E 3M -24 100 6 2 SBHP/CH GR/Add-perfs/SBHP/rerun patch
E 1D-37 300 7 4 Perforate
E 2U -14 8 2 PW IPROF
E 2V -02 9 2 PW IPROF
E 3G -05 150 10 2 Set Eclispe Pkr @ 7658', PTtbg for 30 min
E 1D -42 300 11 4 Perforate post rig (Btm perf 8460)
E 2C -03 12 2 PW IPROF
Squeeze is leaking review with DSE E 230DS10YL 999582
Evaluate cement job for potential iso probs; timing w/surface work E 230DS36FO AKO 135
Ready - Tag'd @ 6685' on 2/14. Need data for core perm study. E 230DS36JL K85327
Tag'd @ 9524' on 2/14. Ready E 230DS36JL K85327
New Well. Ready. C 35TN2N8NG AKOO70
After SL prep E 230DS36ML K85328
After Dummy run C 230DS10DG AK0123
Ready E 230DS28UL K85327
Ready E 230DS28VL k85327
Pkr to be set 3' below production mandrel @ 7648'. C 230DS36GL ??????
After Dummy, Fac ready March 3 C 230DS10DG AK0105
Ready after SL tag/drift E 230DS28CL K85327
* KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 2 of 4
GREATER
I TypeDS WL
E 30 -19
E 1D -32
E 1D -38
E 1D -39
E 1D -40
E 1D -124
E 1Y -22
E 2U -04
E 1F -01
E 1H -11
E lQ -23
E 2X -01
E 3A -15
E 3F -21
E 3G -14
E 3J -16
E 30 -05
EP 1D -102
EP 1D -140
ENGINEERING WELL WORK PRIORI'~~~
KUPARUK
/
BOPD PR StelWork Description
T 13 Re-run IBP for AOGCC MITT
200 14 4 CBL & Perforate 13804-13944
200 15 4 CBL and Peal 13955-14000
200 16 4 CBL and Peal
A 200 17 4 CBL & Perforate 10900-10944'
18 FBHP/Temp Survey on a live ESP
Opportunity PPROF / GLS
2 Settubing patch
200 2 Run Video Log of fish
2 Opportunity PPROF / GLS / DEFT
2 Opportunity PPROF / GLS
PW IPROF
i Opportunity IPROF (SWI)
i 2 Peal New Injector & Initial SBHP
A 135 3 Video Log (post FCO)
i IPROF (Tag good- ok to log, PWI)
i IPROF (SWI)
FBHP/Temp Survey on a live ESP
FBHP/Temp Survey on a live ESP
CTU
Comments/Status/Timing
CosI Property
CodI Charge Code
After SL pulls previous IBP; bad set E
After Dummy run revised depths C
After Dummy run revised depths C
Need Proc; Nabors 16E in the way C
After Dummy run C
Needed for ESP & heat-trace studies for upcoming development E
Well currently SI/WL will need to ask to BOL- tagged 12/11 E
Need pre patch SL work first E
Attempt #3 - after FCO and SL work E
after D &T E
Tag 9333 12/9 will need FCO E
Ready After Water Injection Restored/Flowline repairs undenNay E
Well currently SI for pressure reduction; engineer will notify E
Procedure pending SCMT results; probably after sudace work completed. E
After FCO & tag; suspected casing damage E
Tag'd @ 8611' on 2/4/01 - no FCO but want splits between A3/A2 E
Currently on MI; should not need tag E
Needed for ESP & heat-trace studies, waiting on metering E
Needed for ESP & heat-trace studies, waiting on metering E
230DS36OL
230DS10DG
230DS10DG
230DS10DG
230DS10DG
25WS 1 D6EP
230DS 10YL
230DS28UL
230DS10FL
230DS10HL
230DS 10QL
230DS28XL
230DS36AL
230DS36FO
230DS36GL
230DS36JL
230DS36OL
25WS 1 D6EP
25WS1D6EP
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
CP
CP
CP
3J -07455 I Jet Ice/Mud in tbg, inj test, tag
3F -13A 280 2 Tag / FCO / Run Iso-Sleeve (C sand Shut-off)
1D -42300 4 2 FCO Drilling mud (pre perf)
2Z -19200 5 I Blast Tubing Scale
2C -15200 6 FCO
3G -14A 135 7 I FCO (fill in tubing, 12/22 tag)
2D -1375 8 I FCO
3H -11600 9 ECT Repair WO with Coil Platform
2F -1150 10 FCO
1F -01200 1 FCO fill from Fish and reverse out with filtered SW
1 F -18 100 FCO
1H -02600 2 Swap out Mud (9.7#)
1L-14 i 200 2 FCO?
1L-20 a 100 FCO
lQ -23 50 1 FCO (pre PPROF)
1R -12 50 I Hydroblast Scale
1Y -17 200 3 FCO Frac
2K -09 FCO (foam)
2M -22 FCO (foam)
2T -31 FCO (foam)
3M -03 FCO
1H -01 750 2 Post Rig Mud CO
2D -03 75 1 Remove Coil Velocity String
3N -14 280 2 FCO pending tag higher than 7202' (btm perf)
OTHER WORK
2/19/01 4:36PM
AFC
K85329
AKO107
AKO094
AK0121
AKO129
K85327
K85327
K85329
K85329
K85327
K85329
K85327
K85327
AKO135
K85329
K85327
K85327
K85327
K85327
FCO hydrate plug and BOL while still warm. E 230DS36JL K85329
FCO only if tag above 9150'. Pulled original sleeve on 1/10/01. E 230DS36FL K85329
after SL C 230DS10DG AKO105
Ready; take sample of scale for lab analysis E 230DS28ZL K85328
Ready E 230DS2CFL K85328
Well SI; producing rocks, frac & formation sand; Leave SI for video log E 230DS36GL K85328
Ready E 230DS28DL K85328
Timing unknown, need to be ready anytime E 230DS36HO 999556
Ready, Low BNP, Wait on 1.5" Coil E 230DS28FL K85328
Check w/PWS may have tree leak, May need to pump heavy fluid to get o~ E 230DS10FL K85329
Ready, Fill covering A sand perfs - also pre PPROF E 230DS10FL K85328
Need Proc Post Rig
Tag 5674' 2/14
Ready, Fill covering A sand perfs - also pre PPROF
E 230DS10LL 999437
E 230DS10LL K85328
E 230DS10QL K85329
E 230DS10RL K85329
E 230DS10YL 999582
E 230DS28KL K85328
E 230DS28ML K85328
E 230DS28TL K85328
E 230DS36ML K85328
E 230DS28DL K85328
E 230DS36NL K85328
O
O
O
OP
OP
OP
OP
OP
OP
3A -03A 1000 I Injectivitytest w/Sea Water (pre-stim design)
1Y-17 200 2 2 Pump Frac
1D -37200 3 6 Frac
1D-32 i 200 6 HPBD
1D-38 I 200 6 HPBD
1D-39 I 200 6 HPBD
1D-40 A 200 6 HPBD
1D -42 300 6 Frac
3H -17i 500 A- Sand HPBD
CPFISCALETREATMENTS
After Frac
Ready, Can't pump SI Squeeze as 100% of Perfs covered
Ready, Can't pump SI Squeeze as 100% of Peds covered
Ready, Can't pump SI Squeeze as 100% of Perfs covered
Tag'd fill over A1 sands @ 7805' on 1/20/01
Need Proc Pre Rig exp 2/24
Waiting for current coil tubing to "mile" out.
suspect frac sand in tbg as done in 9/2000 after doubled GL rate
new well with no inflow due to formation damage.
After Perfs
After SBHP, production hder ready 1st wk Mar
Need Proc; After Injectivity test
Need Proc; After Injectivity test
Need Proc; Rig will uncover well -1/31/01
Need Proc; After Injectivity test
Need Proc; After Production test
Tried "poor boy" HPBD; review of results pending.
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1
T1P
T1P
T1P
1D -04
1 D -08
1 L -08
lB -10
1L -23
1 E -20
1Y -27
lA -01
lA -19
1 R -07
1E -12
1Y -28
2Z -13
I SI-4004 Treatment C
2 SI-4004 Treatment
3 SI-4004 Treatment NC
4 SI-4004 Treatment NC
5 SI-4004 Treatment NC
6 SI-4004 Treatment
7 SI-4004 Treatment
8 SI-4004 Treatment NC
9 SI-4004 Treatment A/C
10 SI-4004 Treatment NC
SI-4004 Treatment
SI-4004 Treatment AJC
SI-4004 Treatment
CPF2 SCALE TREATMENTS
SI-4004 SS-5206 PPM
8 1 Ready 12
6 I Ready 10
10 1 Ready 9
25 3 Ready 7
2 I Ready 8
24 2 Ready 7
10 1 Ready 7
20 2 Ready 8
25 3 Ready 6
6 1 Ready 6
18 2 Well SI 7
31 3 Hold until well is RTF; appmx 1~01 8
10 1 Hold until well is RTF 6
T2 2C -15 I SI-4004 Treatment
T2 2V -16 2 SI-4004 Treatment
T2 2T -23 3 SI-4004 Treatment
SI-4004 SS-5206 PPM
BBLS/DRUM
175200
172100
120300
117OOO
114400
113000
111000
109900
94200
51200
37800
118500
122800
BBLS/DRUM
14086
1O78OO
92000
C 230DS36AO AK0132
E 230DS10YL 999582
C 230DS10DG AK0123
C 230DS10DG AK0107
C 230DS10DG AK0094
C 230DS10DG AK0121
C 230DS10DG AK0129
C 230DS10DG AK0105
E 230DS36HG 999438
E 230DS10DL K85328
E 230DS10DL K85328
E 230DS10LL K85328
E 230DS10BL K85328
E 230DS10LL K85328
E 230DS10EL K85328
E 230DS10YL K85328
E 230DS10AL K85328
E 230DS10AL K85328
E 230DS10RL K85328
E 230DS10EL K85328
E 230DS10YL K85328
E 230DS28ZL K85328
E 230DS28ZL K85328
E 230DS28VL K85328
E 230DS28TL K85328
2 1 Ready;frac complete, A-sandisolated 14
38 4 Ready 6
2 I Ready 5
* KEY; S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 3 of 4
GREATER
I Type
KUPARUK ENGINEERING WELL WORK PRIOR~
DS WL BOPD PR StelWork Description
T2 2C -14 4 SI-4004 Treatment
T2 2D -01 5 SI-4004 Treatment
T2 2M -10 6 SI-4004 Treatment
T2 2T -21 7 SI-4004 Treatment
T2 2C -16 St-4004 Treatment
T2 2M -13 SI-4004 Treatment
T2 2M -32 SI-4004 Treatment
T2P 2K -09 2 SI-4004 Treatment- A sd
T2P 2T -37 2 SI-4004 Treatment NC
CPF3 SCALE TREATMENTS
Comments/Status/Timing
2 I Ready
6 I Ready
4 I Ready
5 I Ready
25 3 Ready
2 I Ready
2 I Ready
2 I Post FCO;lasta~emptfailed
3 I Post Gauge & Tag
6 12020O
7 1143OO
6 57780
6 1962O0
6 89600
6 71900
6 79700
5 86300
7 115200
SI-4004 SS-5206
T3 3K -03 1 SI-4004 Treatment 2
T3P 3H -01 SI-4004 Treatment - C only 13
Sum of Scale Treatments SI-4004 bbls= 303
PPM BBLS/DRUM
I Ready 10
I A sand producing, check residuals 1st. P~ 7
41 =bbls SS-5206
77,800
36,400
2/19/01 4:36 PM
CosI Property AFC
Codl Charge Code
E 230DS28CL K85328
E 230DS28DL K85328
E 230DS28ML K85328
E 230DS28TL K85328
E 230DS28CL K85328
E 230DS28ML K85328
E 230DS28ML K85328
E 230DS28KL K85328
E 230DS28TL K85328
E 230DS36KL K85328
E 230DS36HL K85328
* KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK pc~ge 4 of 4
GREATER KUPARUK ENGINEERING WELL WORK .;T 2/19101 12:57 PM
I Ty'pe DS WL NOB
PR Step Work Description
Comments/Status/Timing
Cost Property AFC
Code Charge Code
Cost Codes:
C= Capital
E= Expense
SLICKLINE
S CD1 -21 1 Post rig prep - GLV, SBHP, SSSV Waiting on dg move, ready after 2/15
S CD1 -17 2 Pull SPM gauges poststartup Ready after 12/15
S CD1 -04 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -10 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -22 A 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -24 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -25 3 Run SPM gauges prestartup Ready after 10/30
S CD1 -27 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -34 3 Pull SPM gauges poststartup Ready after 12/15
S WD -02 3 Caliper Survey Annual MIT
S WD -02 3 SSSV, drift, tag Annual MIT
S WD -02 3 SSSV post MIT Annual MIT
S Alp -01 A 4 Prep for observation gauges Ready after 3/1/2001
S Berg -02 A 4 Pull gauges for pulse test Ready after 3/1/2001
S Berg -02 A 4 Prep for observation gauges Ready after 3/1/2001
E-LINE
E CD1 -21 1 SCMT Pending rig move 2/15
E CD1 -26 2 WFL Combo with SCMT jobs
E WD -02 3 WFL and Temp Survey Annual MIT
E Alp -01 A 4 Run observation gauges Ready after 3/1/2001
E Alp -01 A 4 Clean out for obs gauges Ready after 3/1/2001
E Berg -02 A 4 Run observation gauges Ready after 3/1/2001
CTU
C CD1 -38 1 Memory spinner log Ready after 2/1
C CD1 -40 1 Memory spinner log Ready after 2/1
C CD1 -41 1 Memory spinner log Ready after 2/1
C CD1 -43 1 Memory spinner log Ready after 2/1
C CD1 -44 1 Memory spinner log Ready after 2/1
OTHER WORK
O CD1 -21 3 Flowback injection well prestartup Ready after 1/29
O CD1 -16 4 Flowback injection well prestartup Ready after 10/30
O CD1 -23 4 FIowback injection well prestartup Ready after 10/30
C NKALPN4OT 998D01
C NKALPN4OT 998W05
O NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 3ACD016
C NKALPN4OT 3ACD016
C NKALPN4OT 3ACD016
C NKALPN4OT 998W01
C NKALPN4OT 998W02
C NKALPN4OT 998W02
C NKALPN4OT 998D01
O NKALPN4OT 998B15
O NKALPN4OT 3ACD016
C NKALPN4OT 998W01
C NKALPN4OT 998W01
C NKALPN4OT 998W02
E NKALPN4OT 3ACD016
E NKALPN4OT 3AOD016
E NKALPN4OT 3ACD016
E NKALPN4OT 3ACD016
E NKALPN4OT 3ACD016
C NKALPN4OT 998D01
O NKALPN4OT 998W05
O NKALPN4OT 998W05
* KEY; S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 1 of 1
~PHILLIPS Amska, Inc.
A Subsidtau7 et PHILLIPS PETROLEUM COMPANY
Steve Bradley
Well Operations Supervisor
Kuparuk Production
NSK-69
Phone: 659-7348
Fax: 659-7314
February 27, 2001
Mr. Daniel Seamount, Chairman
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Dear Mr. Seamount:
Attached is a listing of upcoming operations in the Kuparuk and Alpine Fields.
This listing is provided as required under the terms of~~'~/~ii!~.~':
If additional data or scheduling information is needed, please call.
Sincerely,
Steve Bradley
Well Operations Supervisor
Attachments
cc: File: FAR 022702, ATe 370
WWPL 3.14
RECEIVED
Naska 0il & Gas Cons. commission
Anchorage
Phillips Alaska. Inc. is a Subsidiary of Phillips Petroleum Company
GREATER KUPARUK ~NGINEERING WELL WORK PRIORITY LIST
ICorn m ent.~/St alu s71'lm in g
cCc~ Pr°PartY
Charge Coda IAFC
Cost
C= Capital
E= Expens~
2/271QI 351 PM
SLICKLINE
2U -12 8OO 1
1H-O2 6O0 2
1H-O2 600 3 3
1D-40A 200 4 1
1H -01 750 $ 1
2V -14 300 6
1D-40A 200 7 2
1D -38 I 200 8 1
2N -3414509
2L -30740010
1L -09 11
1F -20 28412
1D -37200 13 1
2N -336 200 14
2N -316 A. 250 15
2Z -O7200 16 1
2N-337 A 250 17
1D -36200 18
2L -326 A, 200 19
1D -113 180 2O
1D -32 20021 1
2Z -07 20022 4
3F -02 10023
1D -32 20024 2
2U -14 25 1
1D -38 20026 2
2W -13 T 27
1D -39 20028 1
3F -15 29
30 -16 30
lA -16 10031
2V -02 32 1
2W -10 33
3Q -21T 34
3R -25T 35
30 -19T 36 1
1R-01 B 11037
3G -05150 38 1
3F -01150 39
3G-14A 135402
1R -05 10041
16 -05 A 42 1
3H -O3 10043
1R -20 10044
3M -24 10045 1
30 -O4 10046
2C -03 47 1
2M -13 48
3C -06 50 49
3N -O7 1005O
lA -16
lA -19
1 B -0450
16 -05 25 2
1D -32 200
1D -38 200
1D -39 200
1D -40 A 200
1D -10560 1
1 F -02
1F -07 100
1G -02
1G -04 25
1 G -07
1G -15 50
1G -17 150
1H -06
1H -08
1H -11 1
1H -16
1L -10
1L -26
1 L -2825
1 R -0950
1R -12 2
Paraffin Cut and Tag Fill
Paraffin Cut and Tag Fill
Pre Rig SL
Pull Gages & DHSIT
Post pad SBHP
Paraffin Cut and Tag Fill
Tag Fill
Pre Frac Sllckllne
Paraffin Cut
Ddft/'rag (rate loss > 1500 BOPD may be fill)
Tag Fill
Pull Pump
Pull SOV and mn DV
Post Frac GLD
Pull DH gauges, inspect pump
Dummy Gun mn 20'x2.5'
Pre IPROF SL - tag/drift
Dummy Gun mn 20'x2.5'
72 Hour PBU
Dummy Gun mn 20'x2.5"
MI Injection Profile
Memory IPROF (MI Injection)
Open C34 Sand
Pre IPROF SL - tag/drift
CV Check
SBHP,state MIT
State MIT
Set '1-rP, MITT, Pull IBP for re-mn
Initial GLD
Drift w/dummy pump. set DGLV @ 7648'
Run Jet pump & slip stop
Drift and tag (post-FCO / pre-Video)
Pull TTP's. mn new GL design (ANN COMM) Need GL design; 2nd weld complete 02/'25
Pull RHC. cio RP shear Need Proc Post Rig
Measure A sand pressure 2 days after FCO need Proc
Pull SOY and mn DV Post Rig
Post Rig we work Need Proc Post Rig (expect lobe reedy 2/26)
Open C.sands Open sliding sleeve
Dummy Gun run 20'x2,5' FCO'd to 11046 2/17 post rig
Post Drill dg Replace SOY with DV (pre FCO/ped) no scafolding set on 2/11 post dg
Ready
Schedule for 2/28/01 in prep for Baker Chemical treatment
Need Proc
Run 2/22, SI at 0400 2/23. Pull on 2/26.
After pads (post fig)
Ready
Fill problems anticipated.
Remove CAT standing valve & set sand plug accross A-sands
Schedule In conjuctlon with DHD work (Peta/JerlT).
ready
Fill problems anticipated.
Pump could not be revived.
(post rig)
Run GLD prior to POP
Ready to pull after 01/31; gauges needed for 2W-06
FCO'd to 14083 2/17
Ready
FCO'd to 14252 2/16
Ready
FCO'd to 13490 2/15
On MI
On MI now; gauge & tag probably needed
Choke flow with one 3/16" port In a BPI
Ready
Ready, do in conjunction with 2W-13 PBU
Ready - SBHP stop depths sent via Email
Ready (no SBHP required, well is not SI)
READY -MITT tailed, MITIA passed on 2/14.
Well dying off-260 Gross Oil Benefit
2.75' x 15' drift, vedfy ability to pull/set DGLV w/pkr set below mandrel
Jet pump at Y-pad
Jet Pump Inspection and nzle up size; LO SSSV erosional concerns
Pull BCP and run BPI in AVA BPC been In ground since 96- erosional concerns
Open C Sand Potential C Sand eval for Jet pump
Changeout DGLV In Prod'n mandrel Leaking DGLV found in 1/13 log
Pull HES ret. Patch; D&T for peris FP well & load backside for GL unloading later
72-hr PBU w/DHSIT & GLRD Eval damage, rate down 100 bopd; GLRD--Revlsed proc.
Pre IPROF SL - tag/driff Ready
48 Hour PBU w/DHSIT Ready
Close C Sand for sz'r reservoir surveillance
72-hr PBU NO DHSIT; set on collar/tbg stop Ready, evaluating skin for 4Q01 we. corkscrewed tbg
Close & Open C Sand for SZT Puli TPC/wait for 1 week (for SZT) / Reran TPC
PM CV's asset preservation - erosion seen In past 9/99
Open C sand Needed for WF mgmt
Pull BPI and Run BPi w two 1/4' ports 1-2 weeks after A sand is opened
Post pg..'/. ~ After peris
1~ After pelfs
Pact pcd~,BHl~ Alter parts
l:~o~f pad ~ After peris
Drift and Tag/Check SOV Trouble shoot pump. pre Eline leak detect log
Pull Replace sleeve Pending PWN Eval
Tag/Close C need proc
CV PM CV's in Ground since 4/99
Open C3,4 Sand Needed for EOR/MI management
CV PM CV's in Ground since2/99
Initial GLD Ready
Drift with Dummy Straddle
Run Plug and MITT
SBHP (4 day SI needed) will need SI
D&T for Opportunity DEFT/PPROF
SBHP (1 day SI needed) Opportunity pressure
Post Rig work Need Proc Expect completion - 3/9
Tag (Pre FCO) Well appears to have hydrated off
Install GLD JT freezing effect across choke with current OV
SBHP SI injector - Want to BOL after SBHP
CV Check after scale hydreblast
E 230DS28ULK85329
C 23ODS10HGAK0140
C 23ODSlOHGAK0140
C 23ODS10DGAK0129
C 230DS10HGAK0142
E 230DS28VLK85236
C 23ODS10DGAK0129
C 23ODS10DGAK0094
E 35TN2N8PFK85328
E 35TN2L1PFK85328
C 23ODS10LGAK0141
E 23ODS10FLK85327
C 230DS10DGAK0123
E 35TN2NSPFK85328
E 35TN2N8NLK85329
C 23ODS28ZL999566
E 35TN2N8PFK85328
E 230DS10DLK85329
E 35TN2L1LLK85329
E 25WS1D6DLK85328
C 230DS10DGAK0107
C 230DS28ZL999566
E 230DS36FLK85328
C 230DS10DGAK0107
E 230DS28ULK85327
C 230DS10DGAK0094
E 230DS28WLK85327
C 230DS10DGAK0121
E 230DS36FLK85327
E 230DS36OLK85327
E 230DS10ALK85329
E 230DS28VLK85327
E 230DS28WLK85329
E 230DS36QLK85329
E 230DS36RLK85329
E 230DS36OLK85329
C 230DS10RGAK0086
E 230DS36GLK85328
E 230DS36FLK85328
E 230DS36GLK85329
E 230DS10RLK85329
E 230DS10BLK85329
E 230DS36HLK85329
E 230DS10RLK85329
E 230DS36MLK85328
E 230DS36OLK85327
E 230DS28CLK85327
E 230DS28MLK85327
E 230DS36HLK85327
E 230DS36NLK85327
E 230DS10ALK85327
E 230DS10ALK85328
E 230DS10BLK85329
E 230DS10BLK85329
C 230DS10DGAK0107
C 230DS10DGAK0094
C 230DS10DGAK0121
C 230DS10DGAK0129
E 25WS1D6DLK85329
E 230DS10FLK85329
E 230DS10FLK85329
E 230DS10GLK85328
E 230DS10GLK85329
E 230DS10GLK85328
E 230DS10GLK85328
E 230DS10GLK85235
E 230DS10HLK85329
E 230DS10HLK85327
E 230DS10HLK85327
E 23ODS10HLK85327
C 230DS10LGAK0143
E 230DS10LLK85328
E 230DS10LLK85329
E 230DS10RLK85327
E 230DS10RLK85329
· KEY; S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 1 of 3
GREATER KUPARUK ENGINEERING WELL WORK PRIORITY LIST
S 1R -13
S 1Y-O4
S 1Y -17
S 1Y -31
S 1Y -32
S 2A -15
S 2B -O2
S 2B
S 2D ~8
S 2H -04
S 2H -O9
S 2H -O9
S 2K -09
S 2M -17
S 2T -15
S 2U -04
S 2Z -15
S 2Z -19
S 3A .05
S 3A -17
S 3B -14
S 3C -13
S 3G
S 3G -O7
S 3H -01
S 3H -12
S 3H -16
S 3J -03
S 3J~6
S 3J -17
S 3K -23
S 3M -01
S 3N -16
S 3Q -10
SP 1D -O6
SP 1E -20
SP 1E -21
SP 1F-01
SP 1F -16
SP 1L -O9
SP lQ -15
SP 1R -26
SP 2A -11
SP 2B -07
SP 2B -10
SP 2B -10
SP 2C -O4
SP 2C -13
SP 2L -315
SP 2M -30
SP 2M -31
SP 2T -209
SP 3B -05
SP 3B -07
SP 3F -05
SP 3H -01
SP 30 -10
SP 30 -12
SP 3Q -02
150
A 25
20
E-LINE
Comments/St slue/Timing
Drill/Tag Collect Sample
Inspect CV's & AVA
200 4Post Frac GLV's
100 tag tt plug gage tubing
50 Install GLD and tag
2Open C Sand
25 Install GLD
Tag Fill
1Close C sand
0 SBHP on Injector
180 1Pre Frac Slickline
180 4Post Frac GLD
30 1New GLD
Tag/Drift & MI Injection Profile
Open C Sand / SBHP
150 1Pre Patch SL
Erosion/scale CV check
Shut-In C Sand
Lock Out SSSV
Gauge & Tag
48-hr PBU
Tag & PBU w/DHSIT
3 Pull DGLV @ 7648', run jet pump & tbg stop
GLRD for rate
1PDS multi-finger caliper
Lock Out SSSV
Troubleshoot Injector tubing x 7*ann corem
GLRD
GLRD for maintenance
GLRD
50 Drift for scale
50 1 Gauge & Tag; dummy gun run
Gauge & Tag / Inspect Production CVs
PBU w/DHSIT
Lock Out SSSV
Run Gas Lift Design
CV PM
200 3 Continue Fishing (post-video log)
Run tbg plug for Alt MIT
3 Post Rig work
Tag & SBHP -
C sand AVA PM
200 GLD for A-sand production
Close C sand
MI Injection Profile
Close C sand
Tag & Gauge / MI IPROF Memory Log
SBHP Opportunity Work
500 Paraffin Cut and Tag fill
MI Injection Profile
MI Injection Profile
Tag Fill
PFO w/downhole gauges
PFO w/downhole gauges
100 Set Baker K-3 Packoff across hole In tubing
20 2 GLRD for rate
I Lock Out SSSV
I Memory IPROF
Memory IPROF (MI injection)
1Y-17 2001 I PedA4
3J -09 i 3 IPROF (PWI - need 6585')
3J -ol i 4 IPROF (PWI - need 9450')
2L-317 A T 5 2 CBL/Perf/ISBHP
3F -21 6 2 SCMT; need pressure & no-pressure passes
3M -24 1007 2 SBHP/CH GR/Add.perls/SBHP/rorun patch
2U -14 8 2 PW IPROF
2V -02 9 2 PW IPROF
3G -05 15010 2 Sat Ecllspe Pkr @ 7658', PT tbg for 30 rain
2C -03 11 2 PW IPROF
30 -19 T 12 2 Re-run IBP for AOGCC MI3-1'
1D -32 20013 3 CBL & Pedorate 13804-13944, SBHP
1D -38 20014 3 CBL and Per/13955-14000, SBHP
1D -40 A 20015 3 CBL & Perforate 10900-10944', SBHP
1D -135 16 FBHP/Temp Survey on a live ESR
1D -124 17 FBHP/Temp Survey on a live ESP
1D -39 I 20018 2 CBL and Pert, SBHP
3M -01 50 19 2 Initial per/of C Sands
3G -14 A 13520 3 Video Log (post FCO)
1Y -22 Opportunity PPROF / GLS
2U -04 2 Set tubing patch
1F -01 200 2 Run Video Log of fish
1H -11 2 Opportunity PPROF / GLS / DEFT
lQ -23 2 Opportunity PPROF / GLS
23( -01 PW IPROF
Prep for possible stimulation (poss 200 NOB for A sand support)
Last cv inspec7FJ8
After FCO
Eval ability to pull plug lrom 'Ir - History of bad Csd scale
After Water Flow Log
Ready
Ready
Ready. well is SI
Ready
Run pdor to POP
Ready
On PWI.
Ready
Ready
Ready
Ready - CTU mill ocmplete.
Check with PE if well is ready,
Ready; well acts plugged; think FP went away; need for pre-ML planning
Opportunity pressure
Opportunity pressure, last PBU done 5 yrs ago
Well not on OV due to bad unloading valve,**Revlsed procedurel
Determine extent of scale deposition for remedial action
Cannot maintain pressure on hydraulic panel due to downhole leak
Ready; not a wellhead problem
Ready
Big slugger, difficult to test well
Ready
Ready, rate down slightly; recent scale treatment
Pro-C Sand perts
Ready
Ready; opportunity pressure
Complete prior to RIH with any tools
Need Proc;walt results of scale treat
CV's In Ground since2/98 SI w/Derated flowllne 1/26/01
Pending Video, fishing tools
Need Proc Expect completion - 3/16
Has Ice plug
Last PM 2/99, pending DSE decision on SI c sand
On hold as C-sand is open & no lift gas required
Ready
On PWI.
On hold per Mushovic/Dobson
On PWl, Choke Well to 6000 MCFD for 7 Days Prior to Logging
Ready after 9/24
Schedule -3/7 In prep for Baker chemical treatment.
On PWI, Evaluating InJectivIty and possible plugging damage
On PWI,Evaluating tubing restrictions
Do Work Next Time Pump is Down
In conjunction w/pro-MI pressure reduction In spring 2001
In conjunction w/pro-Mi pressure reduction In spring 2001
Waiting for -20 degrees to fill 7" annulus with cold diesel
On hold pending scale determination
Proceed after well wags from MI to water injection
Need tag; well currently on water due to wellhead Integrity prob.
On water now; gauge & tag & set frac sleeve probably needed
pro froc
Ready - Tag'd @ 6685' on 2/14. Need data for core perm study,
Tag'd @ 9524' on 2/14. Ready
New Well, Ready,
Post underream cleanout; use 01/27 procedure again
After SL prep
Ready
Ready
Pkr to be set 3' below production mandrel @ 7648',
Ready after SL tag/drift
After SL pulls previous IBP; bad set
After Dummy run revised depths
Alter Dummy run revised depths
Alter Dummy run
Well is already equipped with gas meter, ready.
Needed for ESP& heat-trace studies for upcoming development
Need Proc
After D & T
After FCO & tag; suspected casing damage
Well currently SI/WL will need to ask to BOL- tagged 12/11
Need pre patch SL work first
Attempt #3 - after FCO and SL work
after D &T
Tag 9333 12/9 will need FCO
Ready After Water Injection Restorod/Flowline repairs underway
Cos{ Properly I
CodlCharge Code ]AFC
E 23ODS10RL K85329
E 23ODS10YLK85329
E 23ODS10YL999582
E 23ODSIOYLK85329
E 23ODS10YLK85328
E 23ODS28ALK85329
E 23ODS28BLK85329
E 230DS28BLK85329
E 23ODS28DLK85329
E 23ODS28HLK85329
C 23ODS28HO999561
C 23ODS28HO999561
E 23ODS28KLK85329
E 230DS28MLK85327
E 23ODS28TLK86329
E 23ODS28ULK85329
E 23ODS28ZLK85329
E 23ODS28ZLK85329
E 230DS36ALK85329
E 23ODS36ALK85329
E 23ODS36BLK85327
E 23ODS36CLK85327
E 230DS36GLK85328
E 23ODS36GLK85328
E 23ODS36HLK85329
E 23ODS36HLK85329
E 230DS36HLK85329
E 230DS36JLK85329
E 230DS36JLK85329
E 230DS36JLK85329
E 230DS36KLK85329
E 230DS36MLK85328
E 23ODS36NLK85329
E 230DS36QLK85327
E 23ODS10DLK85329
E 230DS10ELK85328
E 230DS10GLK85328
E 23ODSIOFLK85329
E 23ODS10FLK85329
C 230DS10LGAK0141
E 230DS10QLK85329
E 230DS10RLK85329
E 230DS28ALK85329
E 23ODS28BLK85329
E 23ODS28BLK85327
E 23ODS28BLK85329
E 230DS28CLK85327
E 230DS28CLK85327
E 35TN2L1PFK85328
E 230DS28MLK85327
E 230DS28MLK85327
E 38TB2T6CLK85329
E 230DS36BLK85327
E 230DS36BLK85327
E23ODS36FLK85329
E230DS36HLK85329
E23ODS36OLK85329
E230DS36OLK85327
E230DS36QLK85327
E 230DS10YL999582
E 230DS36JLK85327
E 230DS36JLK85327
C 35TN2N6NGAK0070
C 230DS36FOAK0135
E 230DS36MLK85328
E 230DS28ULK85327
E 230DS28VLk85327
E 230DS36GLK85328
E 23ODS28CLK85327
E 230DS36OLK85329
C 23ODS10DGAK0107
C 23ODSlODGAK0094
C 23ODS10DGAK0129
E 25WS1D6EPK85327
C 230DS10DGAK0121
E 230DS36MLK85328
E 230DS36GLK85329
E 230DSlOYLK85327
E 230DS28ULK85329
E 230DS10FLK85329
E 23ODS10HLK85327
E 230DS10QLK85329
E 230DS28XLK85327
* KEY; S=$LICKLINE, E=E.LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, ER, CR, OR, TP=PENDING WORK Poge 2 of 3
GREATER KUPARUK ~'NGINEERING WELL WORK PRIORITY LIST
~ 3A -15
E ~ -16
EP 1D -102
EP 1D -140
EP 3F -21
EP 30 ~5
CTU
C 1H -01
C 1H-O2
C 3F -21
C 2Z -O7
C 3N -14
C 3F -13
C 2H -09
C 3G -14
C 2D -13
C 1F -01
C 1F -18
C 1L -10
C 1L -14
C 1L -20
C lQ -23
C 1R -12
C 1Y -17
C 2M -22
C 2T -31
C 3H -11
C 3M -03
CP 2D -03
CP 3J -07
Comments.~St atus/Tlmlng
Opporlunify IPROF (SWl) Well currently SI for pressure reduction; engineer will notify
IPROF (Tag good- ok to lng, PWl) Tag'd ~ 8611' o~ 2/4/01 - no Fca bul want splits between A3/A2
FBHP/Temp Survey on a llve ESP Needed for ESP & heat-trace studies, waiting on matedng
FBHP/Temp Survey on a live ESP Needed Ior ESP & baal-trace studies, waiting on metedng
3 Pert New Injector & (nifial SBHP Procedure pending SCMT results; probably after surface work completed. C 23ODS36FO
IPROF (SWI) Currently on MI; should not need tag E 23ODS36OL
750 I 2 Post Rig Mud CO
600 2 2 Swap out Mud (9.7#)
3 1Underreem/cleenout for SCMT
200 4 3Post Frac Fca
280 5 Fca Ifil
A 280 6 Tag / Fca / Run Isa-Sleeve (C sand Shut-oft)
180 7 3Post Frac Fca
A 135 8 1Fca (fill in tubing. 12/22 tag)
75 9 1Fca
Need Proc Post Rig (expect robe ready 2/26)
Post Rig
Surf work -3/1; suspect green cmt in csg; agreed procedure not needed
Fca of C-sand only
Excellent pressure suppo~l: need t/production & scale treatment
Fca only if tag above 9150'. Pulled original sleeve on 1/10/01.
Fca after frac
Well SI; producing rocks, frac & formation sand; Leave SI fowldeo log
Reedy
200 10 1 FC~fi~fr~mFishandreverse~utwithfi~teredSWcheckw/PWSmayhavetree~eak~Mayneedt~pumpheaWf~uIdt~get~n~ E
100 Fca
Post Rig work
200 FCa/mill cmt in tubing
100 Fca
50 1 Fca (pre PPROF)
50 1 Hydroblast Scale
200 3 Fca Fmc
Fca (foam)
Fca (foam)
600 ECT Repair wa with Coil Plaftorm
Fca
75 1 Remove Coil Velocity String
455 Fca in prep for wa/ST
OTHER WORK
200 I 2 C-sand Fmc
2 2Pre Rig Sand Plug
200 3 2Pump Frac
200 4 2Frac
180 5 2C-sand Frac
2Z -07
1 L -09
1Y -17
1D -37
2H -09
2L -307
2N -326
1 D -32
1D -38
1D -39
1D -4O
1 D -42
2L -315
3H -17
400 6 PAO23 & PEP1 Treatment
500 7 PAO23 & PEP1 Treatment
i 200 4 HPBD
I 200 5 HPBD
I 200 3 HPBD
A 200 5 HPBD
300 Frac
500 PAO23 & PEP1 Treatment
i 500 A- Sand HPBD
CPF1SCALETREATMENTS
Ready, Fill covedng A sand pads - also pre PPROF
Need Proc Expect completion ~ 3/9
Tag 5674' 2/14
Ready, Fill covering A sand parts - also pre PPROF
T1 1E -20
T1 1L -23
T1 1Y -27
TI lA -01
T1 lA -19
T1 1R -O7
T1P 1E -12
T1P 1Y -28
T1P 2Z -13
After Frac
Ready, Can't pump SI Squeeze as 100% of Parts covered
Ready, Can't pump SI Squeeze as 100% of Parts covered
Timing unknown, need to be ready anytime
Tag'd fill over A1 sands @ 7805' on 1/20/01
Waiting for current coil tubing to 'mile' out.
Fill found to 1463' MD; waiting on ST plan to procede
Ready
Need Proc
After Perls
After SBHP, production hder ready 1st wk Mar
Ready
Schedule -3/2 following paraffin scrape
Schedule -2/28 following paraffin scrape
Need Proc; After InJectlvlty test
Need Proc; After InJoctlvlty test
Need Proc
Need Proc; After Inlectlvlty test
Need Proc; After Production test
Schedule -3/9 following paraffin scrape
Tried "poor boy" HPBD; still reviewing results per DSE 2/19/01.
SI-4004 SS-5206 PPM BBLSIDRUM
SI-4004 Treatment 24 2 Ready 7 113000
SI.4004 Treatment A/C 2 1 Ready 8 114400
SI-4004 Treatment 10 1 Ready 7 111000
SI-4004 Treatment A/C 20 2 Ready 8 109900
SI-4004 Treatment A/C 25 3 Ready 6 94200
SI-4004 Treatment A/C 6 1 Ready 6 51200
SI-4004 Treatment 18 2 Well SI 7 37800
Sl-4004 Treatment A/C 31 3 Hold until well Is RTF; approx 10/01 8 118500
SI-4004 Treatment 10 I Hold until well is RTF 6 122800
cC;Property
Charge Code AFC
E 23ODS36ALK85327
E 23ODS36JLK85327
E 25WSlD6EP1(85327
E25WS1D6EPK85327
AKO 135
K85327
CPF2SCALETREATMENTS
T2 2T -23
T2 2C -14
T2 2D -01
T2 2M -10
T2 2T -21
T2 2C -16
T2 2K -09
T2 2M -13
T2 2M -32
T2P2'I' -37
SI-4004 SS-8206 PPM BBLS/DRUM
SI-4004 Treatment
SI-4004 Treatment
SI.4004 Treatment
Sl-4004 Treatment
SI-4004 Treatment
SI-4004 Treatment
2 Sl-4004 Treatment - A sd
Sl-4004 Treatment
Sl-4004 Treatment
2 Sl.4004Treatment A/C
CPF3 SCALE TREATMENTS
2 1 Ready 5 92000
2 1 Ready 6 120200
6 1 Ready 7 114300
4 1 Ready 6 57780
5 1 Ready 6 196200
25 3 Ready 6 89600
2 1 Ready; Fca complete 02~0 5 86300
2 I Ready 6 71900
2 1 Ready 6 79700
3 1 Post Gauge & Tag 7 115200
S1-.4004 SS-5206 PPM BBLS/DRUM
1 A sand producing, check residuals 1st. I
29 =bbls SS-5206
T3 I blank entry for sorllng
T3P 3H -01 2 SI-4004 Treatment - C only 13
Sum of Scale Treatments Sl-4004 bbls= 212
C 23ODS10HGAK0142
C 23ODSlOHGAK0140
C 23ODS36FOAK0135
C 23ODS28ZL999566
E 23ODS36NLK85328
E 230DS36FLK85329
C 23ODS28HO999561
E 23ODS36GLK85328
E 23ODS28DLK85328
23ODS10FLK85329
E 23ODS10FLK85328
C 23ODS10LGAK0143
E 230DS10LL999437
E 230DSlOLLK85328
E 230DSlOQLK85329
E 230DS10RLK85329
E 230DS10YL999582
E 230DS28MLK85328
E 230DS28TLK85328
E 230DS36HO999556
E 230DS36MLK85328
E 230DS28DLK85328
E 230DS36JLK85329
C 230DS28ZL999566
C 230DS10LGAK0141
E 230DS10YL999582
C 230DS10DGAK0123
C 230DS28HO999561
E 35TN2L1PFK85328
E 35TN2L1PFK85328
C 230DS10DGAK0107
C 230DS10DGAKO094
C 230DS10DGAK0121
C 230DS10DGAK0129
C 230DS10DGAK0105
E 35TN2LIPFK85328
E 230DS36HG999438
E230DS10ELK85328
E230DS10LLK85328
E230DS10YLK85328
E230DS10ALK85328
E230DS10ALK85328
E230DS10RLK85328
E230DS10ELK85328
E230DS10YLK85328
E230DS28ZLK85328
E 230DS28TLK85328
E 230DS28CLK85328
E230DS28DLK85328
E230DS28MLK85328
E230DS28TLK85328
E230DS28CLK85328
E230DS28KLK85328
E230DS28MLK85328
E230DS28MLK85328
E230DS28TLK85328
7 36,400 E 230DS36HLK85328
2/27/QI 3:51 PM
KEY: S=SLICKLINE, E=E.LINE, C=CTU, O=OTHER WORK, T=SCAI E TREATMENTS, SP, El=, CP, OP, TP=PENDING WORK Page 3 of 3
2/27/01 3:52 PM
I Type DS WL NOB PR Step Work Description
Comments/Status/Timing
Cost Property AFC
Code Charge Code
Cost Codes:
C= Capital
E= Expense
SLICKLINE
S CD1 -21 1 Post rig prep - GLV, SBHP, SSSV Waiting on rig move, ready after 2/15
S CD1 -17 2 Pull SPM gauges poststartup Ready after 12/15
S CD1 -04 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -10 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -22 A 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -24 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -25 3 Run SPM gauges prestartup Ready after 10/30
S CD1 -27 3 Pull SPM gauges poststartup Ready after 12/15
S CD1 -34 3 Pull SPM gauges poststartup Ready after 12/15
S WD -02 3 Caliper Survey Annual MIT
S WD -02 3 SSSV, drift, tag Annual MIT
S WD -02 3 SSSV post MIT Annual MIT
S Alp -01 A 4 Prep for observation gauges Ready after 3/1/2001
S Berg -02 A 4 Pull gauges for pulse test Ready after 3/1/2001
S Berg -02 A 4 Prep for observation gauges Ready after 3/1/2001
E-LINE
E CD1 -21 1 SCMT Pending rig move 2/15
E CD1 -26 2 WFL Combo with SCMT jobs
E WD -02 3 WFL and Temp Survey Annual MIT
E Alp -01 A 4 Run observation gauges Ready after 3/1/2001
E Alp -01 A 4 Clean out for obs gauges Ready after 3/1/2001
E Berg -02 A 4 Run observation gauges Ready after 3/1/2001
CTU
C CD1 -38 I Memory spinner log Ready after 2/1
C CD1 -40 1 Memory spinner log Ready after 2/1
C CD1 -41 1 Memory spinner log Ready after 2/1
C CD1 -43 1 Memory spinner log Ready after 2/1
C CD1 -44 1 Memory spinner log Ready after 2/1
OTHER WORK
O CD1 -21 3 FIowback injection well prestartup Ready after 1/29
O CD1 -16 4 Flowback injection well prestartup Ready after 10/30
O CD1 -23 4 Flowback injection well prestartup Ready after 10/30
C NKALPN4OT 998D01
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 998W05
C NKALPN4OT 3^CD016
C NKALPN4OT 3ACD016
C NKALPN4OT 3ACD016
C NKALPN4OT 995W01
C NKALPN4OT 998W02
C NKALPN4OT 998W02
O NKALPN4OT 998D01
C NKALPN4OT 998B15
O NKALPN4OT 3ACD016
C NKALPN4OT 998W01
C NKALPN4OT 998W01
C NKALPN4OT 998W02
E NKALPN4OT 3ACD016
E NKALPN4OT 3ACD016
E NKALP N4OT 3ACD016
E NKALPN4OT 3ACD016
E NKALPN4OT 3ACD016
C NKALPN4OT 998D01
C NKALPN4OT 995W05
C NKALPN4OT 998W05
* KEY: S=SLICKLINE, E=E-LINE, C=CTU, O=OTHER WORK, T=SCALE TREATMENTS, SP, EP, CP, OP, TP=PENDING WORK Page 1 of I
~2
Notice of Public Hearing
STATE OF ALASKA
Alaska Oil and Gas Conservation Commission
Re: The application of ARCO Alaska, Inc. for exception to
20 AAC 25.280 for the Kuparuk River Oil Pool, Kuparuk River
Field.
ARCO Alaska, Inc. by letter dated September 18, 1990, has
requested an exception to the provisions of 20 AAC 25.280(a).
The exception would eliminate the requirement for filing a form
10-403 (application for Sundry Approvals) prior to initiating
certain workover operations in Kuparuk River Oil Pool wells, of
the Kuparuk River Field.
A person who may be harmed if the requested order is issued,
may file a written protest prior to 4:00 pm October 19, 1990 with
the Alaska Oil and Gas Conservation Commission, 3001 Porcupine
Drive, Anchorage, Alaska 99501, and request a hearing on the
matter. If the protest is timely filed, and raises a substantial
and material issue crucial to the Commission's determination, a
hearing on the matter will be held at the above address at
9:00 am November 6, 1990 in conformance with 20 AAC 25.540. If a
hearing is to be held, interested parties may confirm this by
calling the Commission's office, (907) 279-1433, after
October 19, 1990. If no proper protest is filed, the Commission
will consider the issuance of the order without a hearing.
C Mmith
Commi s s ioner
Alaska Oil & Gas Conservation Commission
Published October 3, 1990
-F
· STATE OF ALASKA
ADVERTISING
ORDER
Anchorage Daily N~s
P. O. Box 1490~1
Anchorage, A!asl._%~. 99514-9001
A~#-5745 l':"j ii' /'"~ f
Acct#-S?CF0330 ~/~, A0.
AO#-08-5636
Attn: Pat~¥ Shanders
AGENCY CONTACT
Patty.- Shanders
PHONE
(907) 279-1433
DATES ADVERTISEMENT REQUIRED:
Alaska Oil & Gas Conservation ~ssion
3001 Porcup~ Drive
~d%orage, AK 99501
ADVERTISING ORDER NO.
08-5636
DATE OF A.O.
October 2, 1990
October 3, 1990
SPECIAL INSTRUCTIONS:
AFFIDAVIT OF PUBLICATION
UNITED STATES OF AMERICA
Alaska
STATE OF
third DIVISION.
SS
BEFORE ME, THE UNDERSIGNED, A NOTARY PUBLIC THIS DAY
PERSONALLY APPEARED Shelly ~an WHO,
BEING FIRST DULY SWORN, ACCORDING TO LAW, SAYS THAT
HE/SHE IS THE Legal Ad Rep. OF Daily News
PUBLISHED AT Anchorage IN SAID DIVISION
third
AND STATE OF Alaska AND THAT THE
ADVERTISEMENT, OF WHICH THE ANNEXED IS A TRUE COPY, WAS
PUBLISHED IN SAID PUBLICATION ON THE 3rd DAY OF
October 19 90 , AND THEREAFTER FORn°
CONSECUTIVE DAYS, THE LAST PUBLICATION APPEARING ON THE
3rd DAY OF October 19 90, AND THAT THE
RATE CHARGED THEREON IS NOT IN EXCESS OF THE RATE
CHARGED PRIVA"r,;E JNDIV,4DJ~ALS. ,/~ .,,,
s o.. o
MY COMMISSION EXPIRES
REMINDER--
INVOICE MUST BE IN TRIPLICATE AND MUST REFERENCE
THE ADVERTISING ORDER NUMBER.'
A CERTIFIED COPY OF THIS AFFIDAVIT OF PUBLICATION
MUST BE SUBMITTED WITH THE INVOICE.
ATTACH PROOF OF PUBLICATION HERE.
,r':,'!::~ .eti'Ce 0f'' Pu~i'iC Heari,
20:;;i
)aruk River
.~i?.]';'i: ..ARCO At ask a;. I n c. by.let-
ter ~lated sepfember 18, 1990,
Ilas' i'equeSted, an exception to
t:h,'b',' P'r0visi,Ons' 6f '20" AAC
2~i'~380(a,,),~', T:h'e,eXcePtion Would
eJit:m qate the: requirement for
fi!'l ng ,a': ,form":'",10-'403" (applica-
ti.6n :,for:. sundry' Approvals)
".pd6~".t011nl,t;i~'t:lfi'g ~ertain' wor-
k0'v'e~ operations..in. Kuparuk
'River o .',.Po'6 'We s; 0f'.the
,.:Kuparuk .Ri:Vet F'ield, ". ''
i~'''', "'A'i p~r'~0n. WhO ma?'"be'.
· .ha'rme'd if 'the 'be~luested.,..o~der
Is'issu'ea, 'may file a written'
protest '~3r~or to 4.:00 pm Octo:'
bet ~9, 1990 with the Alaska
.Oi .~'and'Gas Conservation
C:0m m;is.~!on C.. 3003.~. 'i PorcuPine
Dr.va Ant,or a.=Je .'Alaska
.~.~01 -mc r.'.c.es! .~ hearing
o~. t.'c. :;n".e;;. "~.~," °rotest is
ti.re'ely filed, ano. r'a~ses, a. sub:
' sta. ntla "dod' 'md're'rial issue
dete~ml6ation~, a ~ neemng, on
h~id,at:the
i,"above:~.addreS{', at. ~.,00' am No~
.vembe~'. ~ 1990 in conformance
Witl~','20,~iAAC 25 S40 If.a fiear-
,..~ig" :':i~'.~",~o .be.. held,, i rfferest.ed
part ~..~ay '.c0nfil;m 'this: Dy
c~tling :.the commission's ' of-
fl~ei.:. (~_0'7),: 279:1433; after octo'
ber:."]'9;,.'1990. ,If no p~oper
P'r0tesf ~ s. flied, the'. C(~mmis'-
sj'6n'Wl~l,l',,~consider tb'e issuance
of..the~ 0~der. withouf'a hearing.
/~i.L.;0'nnle C, Smith ".
' :' 'commiss oner , .
A(aSka Oil: and Gas , ..'' .
C'onservation Comm ssi(~n.
Pbbi October 3, 1990 . .:..
AO~~ 08,5636 ~, . ,,,~,'I
, ,
02-901 (Rev. 6-85)
PUBLISHER
~1
ARCO Alaska, Inc./[''
Post Office Box 100360
A~chor~ge~ Alesk@ 9~510-0360
Telephone 907 276 1215
September 18, 1990
Mr. L. C. Smith
Commissioner
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
RES ENG
SR ENG
COMM
COMM
SRENG
ENG ASS'['
ENG ASST
S--~--GEO--E---~_
-~-. E--O~-A,,: ST
~'-TEC~t
;FILE '
RE: Application for Exception to 20 AAC 25.280(a)
Dear Mr. Smith:
Please consider this letter a request by ARCO Alaska, Inc. as Operator of the Kuparuk
River Unit, for an exception to the AOGCC's regulation 20 AAC 25.280(a).
Applicant requests that the requirements of 20 AAC 25.280(a) be eliminated for all
wells in the Kuparuk Oil Pool of the Kuparuk River Field. This regulation requires
the filing of Form 10-403 (Application for Sundry Approvals) with respect to the
following activities: (1) perforate or reperforate casing (2) stimulate, (3) pull
tubing (4) alter casing, and (5) repair well. The Applicants believe that the above
described activities have been conducted over a sufficiently long period of time such
that their methods have become routine and the results predictable. The AOGCC will
be able to continue monitoring these activities, since they are reported on Form
10-404 (Report of Sundry Well Operations), which is filed within 30 days after
each well operation.
Applicant believes that elimination of the Form 10-403 filing requirement as
outlined above will not adversely affect ultimate recovery or create waste and
conforms with prudent oil field operation and reservoir management.
Sincerely,
P. S. White
Senior Operations Engineer
RECEIVED
SEP 0 990
N ska Oil & 6as uons. uomm'tss'tot
,, LAn laorago
ARCO A~aska,