Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-058 Imag~' roject Well History' File Cover I1 ~le
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
c~oL - ~5'~ Well History File Identifier
Organizing
R/~CAN
Color items:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:
NOTES:
~Two-Sided
DIGITAL DATA
J Diskettes, No. ~L/
[] Other, No/Type
BY:
BEVERLY ROBIN VINCENT SHERYL~~/VINDY
OVERSIZED (Scannable)
[] Maps:
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
[] Other
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
Scanning Preparation
~ x 30 : _~:?iO
BY:
BEVERLY ROBIN VINCENT SHERYL~WINDY
TOTAL PAGES
Production Scanning
Stage I PAGE COUNT FROM SCANNED FILE: ~ '~: ........
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ..~ YES
BEVERLY INCENT SHERYL MARIA WINDY DATE Is/
BY:
Stage 2
BY~
(SCANNING IS COMI:;LETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES)
NO
IF NO IN STAGE 1 ~ PAGE(S) DISCREPANCIES WERE FOUND: ~ YES ~ NO
RESCANNED B~: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
General Notes or Comments about this file:
DATE: IS~
Quality Checked
12/10/02Rev3NOTScanned.wpd
e
e
~~......
'\. ...~~
\ ~
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _Inserts\Microfilm _Marker. doc
l STATE OF ALASKA '
' ALASKA ,L AND GAS CONSERVATION COM~ 310N
~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: 0 Oil 0 Gas 0 Plugged 1m Abandoned 0 Suspended 0 WAG 1b. Well Class:
20AAC 25.105 20AAC 25.110 1m Development 0 Exploratory
0 GINJ 0 WINJ 0 WDSPL No. of Completions Zero Other 0 Stratigraphic Test 0 Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 11/18/2003 .' 201-058 / 303-246
3. Address: 6. Date Spudded 13. API Number /'
P.O. Box 196612, Anchorage, Alaska 99519-6612 5/2/2001 50-029-21762-01-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 6/26/2001 PBU K-10A
2007' SNL, 481.7' WE~, SEC. 04, T11N, R14E, UM 8 KB EI f (ft). 15 F Id 1 P I( ).
Top of Productive HOrizon: . eva Ion. . Ie 00 s .
34' SNL, 1986' WEL, SEC. 05, T11N, R14E, UM RKB = 54.3' ~~o~hoe Bay Field 1 Prudhoe Bay
Total Depth: 9. Plug Back Depth (MD+ TVD)
105' NSL, 1559' WEL, SEC. 32, T12N, R14E, UM 10458 + 9036 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 670732 y- 5975196 Zone- ASP4 10525 + 9037 Ft ADL 028299
TPI: x- 668235 y- 5977114 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 668657 y- 5977262 Zone- ASP4 N/A MD
- 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey 0 Yes iii No N/A MSL 1900' (Approx.)
21. Logs Run:
MWD 1 GR, Memory GR 1 CCL 1 CNL, LDL
22. CASING, LINER AND CEMENTING RECORD
'I':, CÁSING"'''~''':'''''''''':' "~I "'I, , uETTJNG'I';DEPTH"MD':,I' 'SETTING,'DEPTffTVD" , "'HoLe. ' ,,',,'1:'1':,' ,,', ,,' "",: """"",' ,',I,"~ ',"'" "'" " 'AMOUNT
SIZE WT. PER FT. GRADE, "" 'OP BOTTOM' Top. ' 'BOTTOM' SIZE 'CEMENTING RECORD PULLED
20" Surface 110' Surface 110' 8 cu vds Concrete
13-3/8" 72# L-80 1 S-95 Surface 2694' Surface 2694' 17-1/2" 1860 cu ft AS 111,1860 cu ft AS II
9-518" 47# L-80 Surface 9479' Surface 8639' 12-1/4" 1973 cu ft Class 'G'
7" 26# L-80 9197' 9600' 8384' 8747' 8-1/2" 345 cu ft Class 'G'
3-1/2" x 2-7/8" 9.3# 1 6.16# L-80 9200' 10525' 8387' 9037' 3-3/4" 80 cu ft Class 'G'
23. Perforations Op'en to Production (MD + TVD of Top and ",,', ,,', '",,,.,,', ",',,', ",,,,,,,,,,,,"::."":;11 ,,',1,"'; ",:""',,,""', ",'"',:.,'"""",,,,1"" ,1'::'""'"",",:'",i;:'I:',,',"',"""":,,
B tt I t I S. d N b .f t t" ") ,,~.',:: ;,'~,:", ":',":,::",:,
0 om n erva, Ize an urn er; I none, s a e none: SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 9271' 9151'
MD TVD MD TVD
25. , , ACID, FRACTURE, CEMENT SaUEEZE,ETC;
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ~!
9625' Set CIBP ./" I\V
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production NI A
Date of Test Hours Tested PRODUCTION FOR OIL-BsL GAs-McF WATER-BsL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED + OIL-BsL GAs-McF WATER-BsL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA ~I-( :1-1\/1-11
Brief description of lithology, porosity, fractures,apparel1t dips and presence of oil, gas or water (attach separate sheet, ìTnecessary).
Submit core chips; if none, state "none".¡':];;l:,'~'lB~~lNí JAN 2 1 2004
:",ß-1:,.:'I,', '
None /1 r ; ? ' 0. '?> . .' .
'. .,......, ' ,- Alaska 011 & Gas Cons. Comrmsslon
IIiN ~g 200,~ 1:."A 0 RIG I N A L Anchorage
,ßlIiIoftiL
Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE I, BfL(g F jA.N l. -', lUU'
28. . GEOLOGIC MARKERS 29. ( )RMATION TESTS
Include and briefly summarize test results. List intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River 9563' 8715' None
Shublik 9616' 8761'
Sadlerochit 9664' 8804'
Zone 3 9757' 8875'
Zone 2 9857' 8943'
25P 9978' 9003'
24P 10054' 9028'
RECEIVED
JAN 2 1 2004
Alaska Oil & Gas Cons. Cormnission
Anchorage
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble /{Q Title Technical Assistant Date 01" ~ -0
PBU K-10A 201-058 303-246 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No.1 A roval No. Drilling Engineer: Mark Johnson, 564-5666
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
( (
Well: K-10B Accept: 11/30/03
Field: Prudhoe Bay Unit Spud: 12/02/03
API: 50-029-21762-02 Release: 12/08/03
Permit: 203-145 Rig: Nordic #2
Date
PRE-RIG WORK
10/26/03
SET DSSSVIPLUG, FAILED CLOSURE TEST. PULL PLUG ASSEMBLY. RE-SET DSSSVIPLUG, FAILED
CLOSURE TEST. WHILE PULLING PLUG ASSEMBLY, TOOLS WERE BLOWN UP HOLE. DROPPED TWO
CUTTERS CUTTING WIRE ON SECOND ATTEMPT. APPROXIMATELY 60-70' WIRE AND TOOLSTRING IN
HOLE.
10/27/03
RETRIEVED BOTH CUTTER BARS & APPROX. 55' WIRE. RETRIEVED LOST TOOLSTRING. ATTEMPTING
TO PULL D-SSSV AND SMALL PIECES OF WIRE.
10/28/03
PULLED DB DSSSV WI PLUG. BRUSHED SSSVN. PLUG WILL NOT STAY IN SSSV NIPPLE AFTER
SEVERAL ATTEMPTS. (POSSIBLE SCALE BUILD UP IN KEY PROFILE). BRUSH SSSVN & 1000' BELOW
NIPPLE. RDMO.
11/15/03
DRIFT WI BAKER TATTLE TAIL DRIFT 12' 2" OAL 2.455 NO-GO 2.735 MAX OD. SO @ 9610' SLM HIT OWN.
POOH. PIN IN TATTLE TAIL DRIFT NOT SHEARED.
11/16/03
DRIFT WI 3' 1 114" STEM 2.25 CENT SB TO 9804' SLM POOH (SB EMPTY). HAVE COBURN TURN OWN.
WEATHERFORD XO TO 2.25 FROM 2.455 OD (MIN. 102.37). RIH WI WEATHERFORD TATTLE TAIL DRIFT
12' 2" AOL 2.60 NO-GO 2.735 MAX OD SD @ 9605' SLM HIT DWN. POOH (TATTLE TAIL PIN SHEARED).
RDMO.
11/17/03
WELL SI. WAIT FOR TREE AND HARDLlNE VALVES TO BE SERVICED. WAIT ON WEATHERFORD TO
LOCATE MISSING DRIFT. MU WEATHERFORD 2.74" NO-GO TATTLE TAIL DRIFT. KILL WELL WI 1% KCL.
FREEZE PROTECT TUBING TO 2500'.
11/18/03
RIH WI WEATHERFORD 2.74" TATTLE TAIL DRIFT. DRIFT TO 9607'. STACK 3K#. POSSIBLE SHEAR OF
TATTLE TAIL OBSERVED. FLAG CT 20' ABOVE TAG. POOH. TATTLE TAIL SHEARED. TOOL AND BOTTOM
400-500' OF CT HAD ASPHAL TINE DEPOSITS. MUIRIH WI 2" JSN. JET 60 BBLS DIESEUXYLENE FROM 9650'
èo 75'. POOH. MU BHA WI WEATHERFORD ALUMINUM BILLET & TIW BRIDGE PLUG. TAG CROSSOVER
96 3' 9 (CTM). SHEAR @ 4300 PSI/19K#. PLACEMENT OF TOP BILLET IS AT DRILLERS DEPTH OF
962 .. I (0.5' BELOW TOP OF 3 3/16" X 27/8" CROSSOVER). POOH. FP BACKSIDE TO 2000'. AT SURFACE ---
FORM 30 MIN PT TO 1100 PSI. GOOD. POP OFF WELL. SETTING TOOL LOOKS PROPER. RDMO.
11/20/03
T/I/O=230/120/VAC. TEMP=SI. BLEED WHP'S (PREP FOR TREE C/O). BLED IA FROM 120 PSI TO 0 PSI IN 40
MIN. SWAP TO TBG. BLED TBG FROM 230 PSI TO 0 PSI IN 1.5 HRS. MONITOR FOR 30 MIN. NO CHANGE IN
WHP'S. FINAL WHP'S=OIOIO.
.. ( (
BP EXPLORATION Page 1 f8
Operations Summary Report
Legal Well Name: K-10
Common Well Name: K-10 Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 11/27/2003 End: 12/8/2003
Contractor Name: NORDIC CALISTA Rig Release: 12/8/2003
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
11/29/2003 08:00 - 00:00 16.00 MOB P PRE RU and perform cement pumping test thru 2-3/8" ECT while
rigged up on DS 2-29b. Blowdown reel with N2. Remove reel.
Prep to move from 2-29B > K10
Costs charged to PBD4P2147
11/30/2003 00:00 - 07:00 7.00 MOB P PRE Finish working on 2-29B. ND BOPE install tree cap and test to
5k. RDMO off well at 0530 hrs. Clean location and inspect.
Continue to prep rig for move to K-10 location.
07:00 - 08:00 1.00 MOB P PRE Safety mtg re: rig move to K Pad
08:00 - 09:15 1.25 MOB P PRE Move camp to K Pad. WO Security and trucks for misc
equipment
09:15 - 17:00 7.75 MOB P PRE Move rig onto West Dock Rd and head to K Pad
17:00 - 18:00 1.00 MOB P PRE Arrive on K Pad. Raise derrick. General RU
18:00 - 18:20 0.33 MOB P PRE Crew changefTUsafety mtg
18:20 - 21 :30 3.17 MOB P PRE General RIU set rig mats. Scope out derrick. Raise and secure
2" E-line reel. Position rig over well.
21 :30 - 00:00 2.50 MOB P PRE Rig accepted at 2130 hrs 11-30-2003
Fill in air gaps around cellar area and warm up wellhead and
BOP stack. (-25 degs). Continue RIU. Notify AOGCC of BOP
test.
12/1/2003 00:00 - 03:00 3.00 BOPSUF P PRE Remove tree cap. Nipple up BOPE. Coil reel is in place and
secured. Allowing to thaw out while testing BOPE.
03:00 - 09:30 6.50 BOPSUF P PRE Thaw out choke manifold lines with steam. Test BOPE.
AOGCC rep. John Crisp wavied witnessing test.
09:30 - 14:00 4.50 RIGU P PRE RU and pull 2" ECT to floor. Install Kendall CTC. PT 35k.
Connect BHI to eline and perform continuity tests
14:00 - 16:30 2.50 STWHIP P WEXIT Fill CT w/ 2% KCI (circ at slow rate to avoid moving slack).
Grease crew pump open SSV. Check well for pressure and
none./Run down special fusible cap
16:30 - 17:15 0.75 STWHIP P WEXIT MU milling BHA
17:15 -19:25 2.17 STWHIP P WEXIT RIH w/ BHA #1 (2.75" go/2.74" no-go window mill w/2.5 deg
fixed WII motor) taking wellbore returns to cuttings box while
pumping thru EDC at 0.3/140 w/ KCI Tagged up on Sliding
Sleeve at 9080' coil depth. Orient right to 90L and went through
okay. Continue RIH tagged at 9200' should be X nipple. Orient
to HS continue RIH to 9550'.. up wt 31 K RIH to 9570'.
19:25 - 19:40 0.25 STWHIP P WEXIT Log tie-in -4' correction. Start swap to flo-Pro mud. Lines frozen
someplace back to bio/kcl.
19:40 - 20:40 1.00 STWHIP P WEXIT RIH pumps off with 30L TF tagged at 9620.4' Unthaw lines.
Pump FP around.
20:40 - 00:00 3.33 STWHIP P WEXIT Close EDC 1.5bpm 2000psi. RIH wt 13280# RIH tag and stall
at 9619.7' this should be the "Mill out XO" p/u 10' RIH slowly to
9618.5' and see start of MW w/1k wob. mill to 9619' p/u to
9618' and paint flag. Continue milling window fOllowing program
outline to 9620.7 midnight depth.
12/2/2003 00:00 - 01 :40 1.67 STWHIP P WEXIT Continue milling window from 9620.7' exiting into formation at -
9622.5'
01:40 - 04:10 2.50 STWHIP P WEXIT Drill formation from 9622.5' 1.5bpm 2300psi FS 700psi MW.
Good MW until 9624.8' Work pipe and pump get motor to stall
at reduced rate. Let set on bottom for awhile then took off
drilling again with 6-7k wob 1.5 bpm 500psi mw. Drilled to
9632.5'
04:10 - 04:30 0.33 STWHIP P WEXIT Log gr tie-in +1'
04:30 - 06:20 1.83 STWHIP P WEXIT TOH paint EOP flag at 9500'
Printed: 12/1712003 9:19:42 AM
v ( (
BP EXPLORATION Page 2'"
Operations Summary Report
Legal Well Name: K-10
Common Well Name: K-10 Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 11/27/2003 End: 12/8/2003
Contractor Name: NORDIC CALISTA Rig Release: 12/8/2003
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
12/212003 06:20 - 07:00 0.67 STWHIP P WEXIT LD window milling assy. Mill was same gauge as before and
had barely noticeable center wear. Motor was tight. MU
diamond tapered mill 2.73" 00 on 1.75 adj WI! motor
07:00 - 08:50 1.83 STWHIP P WEXIT RIH w/ BHA #2. Corr -25' at flag
08:50 - 09:20 0.50 STWHIP P WEXIT Log tie-in over 9550-80', add 6.0'. RIH w/o pump to tag at
9619.8'. Make several attempts to get thru, but will have to mill
it
09:20 - 11 :30 2.17 STWHIP P WEXIT Start motor 1.5/2330/30L and dress window. Start dressing at
and had several stalls at 9619.4'. Gained wt back at 9619.8'
and were thru the worst of it
11 :30 - 13:20 1.83 STWHIP P WEXIT Continue dressing window from 9619.8' Made numerous
passes backreaming at offset TF angles. Ran down through
window several times dry without hang-ups. Looks good.
Samples are showing mostly limestone.
13:20 -14:45 1.42 STWHIP P WEXIT TOH paint EOP flag at 9500'.
14:45 -15:20 0.58 DRILL P PROD1 UD BHA #2 and p/u build assembly. Tapered mill in-gauge
2.73" slight wear at top section
15:20 - 17:05 1.75 DRILL P PROD1 RIH w/ BHA #3 (53.15' :bit> NBI 12.69' bit>gr 26.59'
bit>survey 27.44') to flag correct -6'. P/U 29.6k dwn 20.3k
17:05 - 17:45 0.67 DRI LL P PROD1 Lo r tie-in startin at 9580' correct +6'. Close EDC
17:45 - 22:30 4.75 DRILL P PROD1 Drill ahead. 1.53 bpm @ 2200 psi FS. 200-300 psi MW. Slow
progress while working BHA through window. Drill build
section to 9820'. Averageing 45 deg d-Iegs. ROP:40-
WOB: 2K-3K#
22:30 - 23:00 0.50 DRILL P PROD1 Short trip to window. Hole smooth.
23:00 - 00:00 1.00 DRILL P PROD1 Continue drilling build at 9840.
12/3/2003 00:00 - 01 :00 1.00 DRILL P PROD1 Continue drilling build section. Conti
legs. Drill to 9873'.
01 :00 - 03:00 2.00 DRILL P PROD1 Decide to POOH to reduce or angle.
03:00 - 03:30 0.50 DRILL P PROD1 Inspect bit. Good condi' . Re ran same bit. Reset motor
angle from 2.8 to 1. ego Should result in 20-25 deg build
rates.
03:30 - 05:30 2.00 DRILL P PROD1 RIH to land lid section.
05:30 - 06:00 0.50 DRILL P PROD1 Log gr' In from 9580'.
06:00 - 07:15 1.25 DRILL P PROD1 No oblem through window. Directionally drill ahead f/9873'
.5bpm 2000FS 3-400psi MW 2k WOB 80-90'/min. Drill to
9987' found fault and temporarily stuck. Stop pump relax mud.
P/U and free. Good returns.
07:15 - 07:45 0.50 DRILL P Wiper trip to window.
07:45 - 10: 15 2.50 DRILL P Back on bottom motor stall. P/U free. Drill ahead cautiously f/
9980'. Fluctuations in MW working through fault zone continue
drilling ahead, no mud losses. Drill to 10120'
10:15 - 11 :15 PROD1 Wiper trip. Pull to 9670' pumping 1.5bpm RIH shutdown pump
and open EDC while moving downhole. Bring pump to 2.5bpm
(3250psi FS) pull up into 41/4" tbg to 9100'. RIH past window
shutdown pump closed EDC bring on pump and continue to
bottom.
0.92 DRILL P PROD1 Drill ahead f/10120' to 10200' 1.57bpm 2100FS 2-300psi MW
2.25 DRILL P PROD1 TOH f/1 deg motor. Open EDC as before on wiper trip. Pull to
500' then RIH to 850'. Continue TOH unloaded good amount of
cuttings.
0.58 DRILL P PROD1 Adjust motor to 1.1 * inspected check valves and p/u new bit.
1.92 DRILL P PROD1 RIH w/ BHA #5 to 9570'.
Printed: 12/1712003 9:19:42 AM
STATE OF ALASKA~ t"
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
1. Type of Request:
[] Abandon [] Suspend [] Operation Shutdown [] Perforate [] Vadance [] Other
[] Alter Casing [] Repair Well [] Plug Perforations I-I Stimulate [] Time Extension
[] Change Approved Program [] Pull Tubing [] Perforate New Pool [] Re-Enter Suspended Well [] Annular Disposal
'2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. [] Development [] Exploratory 201-058 /''
3. Address: [] Stratigraphic [] Service 6. APl Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21762-01/''
7. KB Elevation (ft): RKB = 54.3' 9. Well Name and Number:
PBU K-10A /'
8. Property Designation: 10. Field / Pool(s):
ADL 028299 Prudhoe Bay Field / Prudhoe Bay Pool
.11. :;. :. i: ::. :i: 'iii; :i;.i.: :::.: ;::.":: ;:':' :. i::;PRESENT':WEEI,. CONDITION .SUMMARY:;:::..: ::::i: :: ::::' :i !i: : :.:.i::i ..;i.; : :i ~:.::.!::
Total Depth MD (ft): Total Depth TVD (ft):I Effective Depth MD (ft): IEffective Depth TVD (ft):i Plugs (measured): Junk (measured):
10525 9037 I ! 0458 I 9036 None None
StrBctur¢
Conductor 110' 20" 110' 110' 1530 520
Surface 2694' 13-3/8" 2694' 2694' 6390 2820
Intermediate 9479 9-5/8" 9479' . 8639' 6870 4760
Production
Liner 403' 7" 9197' - 9600' 8384' - 8747' 7240 5410
Liner 1325' 3-1/2" x 2-7~8" 9200' - 10525' 8387' - 9037' 3000 3000
,
, ,
'Perforation Depth MD (ft): I Perforation Depth TVD (ft):I Tubing Size: Tubing Grade: Tubing MD (ft):
10101'- 10250' . . ..I 9036'-9039'I 4-1/2", 12.6tt L-80 9271'
Packers and'sssv Type: 9-5/8" TIW ;HBBP' packer; ............ Packer~'and sssv MD (ft): 915i' '
4-1/2" camco sssv Nipple 1967'
12. Attachments: ' 13. Well Class after proposed work:
[] Description Summary of Proposal [] BOP Sketch
[] Detailed Operations Program [] Exploratory [] Development [] Service
';1"4'.' Estimated Date for " 15. Well Status after proposed work: '
Commencing Operations: September 1, 2003 '/ [] Oil [] Gas [] Plugged [] Abandoned
,
16. Verbal Approval: Date: [] WAG [] GINJ [] WlNJ [] WDSPL
Commission. Representative: ..........
· J 7. i hereby certify that the foregoing is true and Correc~ t~'the best of my knowledge, co',tact Mark Johnson, 564-5666
Printed Name Mark Johnson or Lamar Gantt Title CT Drilling Engineer 'L'~a'¢ G~ntt, 564-5593"
,.D, ./~ ¢~ ~ / '.. Prepared ByName/Number:
Signature ~¢~/y~ ~', ,J~O,J;~ Phone 564-5593 Date .~,.~/~-~ Terrie Hubble, 564-4628
'"': . :".'i.'.':. ii,:'i ";.' '.. i~. "'. ii: ..': ~ .i. '.'. ""i" '":'i.":",''.:I.: ")ii'.':'::.,i';i". i;i'. c°mmis,$,i°n. Use, o, nlY~ i: :';".'::: :': "' "' ' .'." ..... '.' '".. ".. " '": '"'
I Sundry Number: ~)~,..
Conditions of approval: Notify Commission so that a representative may witness
[] Plug Integrity [] BOP Test [] Mechanical Integrity Test [] Location Clearance
,
Other: /.',':i: !1.; ~:"i ;i' '".
Subsequent form required 10- /2~Lo 7 ' ""
Approved By: ~ ~ COMMISSIONER THE COMMISSION Date ,,~
Form 10-403 Revised 2~2003'
0R'I61NAL
Submit In Duplicate
To:
Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Mark O. Johnson
CTD Engineer
Date: August 14, 2003
Re: P&A operations for well K-10A in prep for a CTD sidetrack
Well K-10A is scheduled for a through tubing sidetrack with the SLB/Nordic 2 Coiled Tubing Drilling rig. The
sidetrack, K-1.0B, will exit out,fl'the existing 3 ½" liner at 9624' from a 3 3/16" x 2 7/8" crossover subhnd f
target the Sag River. The existing 2 7/8" liner perfs are gassed out and will be abandoned with a CIBP( The
following describes work planned for the P&A and is submitted as an attachment to Form 10-403. A schematic
diagram of the proposed sidetrack is attached for reference.
Pre CTD Summary 1) Slickline -Drift tubing. Dummy gas lift valves. Pressure test IA to 3000 psi. - already done
2) Slickline - Drift for 2 7/8" CIBP)o 9700' md.
3) EL - Set 2 7/8" CIBP at 9630' md (6' below 3 3/16" x 2 7/8" liner crossover). Pressure test CIBP to
1000 psi. Wellbore abandonment is complete. If the well does not pass the pressure test, no further
work will be done. The sidetrack completion for K-1 OB will cover the old K-10A completion with liner
and cement as redundant isolation.
4) Service Coil - Spot cement on. top of crossover to facilitate sidetrack window milling.
CTD Sidetrack Summary 1) MIRU CTD rig.
2) Mill 2.74" OD window off of 3 3/16" x 2 7/8" crossover at 9624' md.
3) Drill 2.70 x 3.0" bicenter openhole sidetrack to -11300' TD with MWD/gamma ray.
4) Run 2 3/8" Bonzai cemented/pre-drilled liner completion. Top of liner will be at -9170' md in 4 ½"
tubing tail. Transition from cemented liner to pre-drilled liner will be at -10200' md.
5) Cleanout Bonzai equipment.
6) RDMO.
The pre CTD work is slated to begin on 9/1/03.
Mark O. Johnson ///
CTD Drilling Enginff~"
564-5666, 240-8034
CC:
Well File
Sondra Stewman/Terrie Hubble
TRI~ = 6" CIVV
WI=I I I-EAD = MCEVOY K 10A× SAFETY NOTES: WI]' L EXC EBbS 70° @ 10020' AI~
ACTUATOR = AXR SON ~ GOES HORIZONTAL @ 10141'.
KB. ELLA/ = 54.33'
Max Angle = 92@10419'
Datum MD = 9728' '
DatumTVD= 8800'SS
13-3/8" CSG, 72#, S95. BTRS, ID = 12.347"H 2694' H ~' GAS LFT MAI~DRELS
i ST MD TVTVD1 DEV TYTYPE1 V LV LATCH PORT DATE 1
4 3018 6 DV PA 1.5" 12/08/00'
[ '~,~ 3 6069 5657= 35 LBD' DV PA 1.5" 12/08/00
2 8574 7787 25 LBO DV PA 11.5" 12/08/00
Minimum ID = 2.37" @ 9624' 1 8997 8150 24 LBD DV RA 1.5" 12/08/00
' 3-3/16" X 2-7/8" LNR XO L..__
Illmlllll
~--- -1 9230 ~ TOPOFa-1/2"Lm,~.a#,Ft.4S,~D--2.m ' I
I-----'t 9236' I'-i 4'lr2~OT~SXU~P'UU'mTO3'8*'~D
'1 9-518"CSG. 47#,L-80BTRS, ID=8.681" H 9479' · 7" MLLOUT WINDOW
I 7" MARKER JOINT H 949Z " 9599'- 9606'
I RATAG ~ 9606' 962Z 3-112"X3-3/16"LNRXO, ID=2.8(7'I
RFJ: kO~: $W$ C.-~O2;t./~NL ON 0~27/01
Noto: Rofor to R'odu¢~ion DB for historical
2" 4 10101 - 10250 O 08128101
DATE REV BY COIVlVIENTS DATE REV BY COIVIVIENTS PRUDHOE BAY UhlT
11/19/87 I INrrlAL COIVPI_ETION 06/28/01 CTD SDETRACK WELL: K-10A
01/05/00 SIS-QAA CONVERTEDTOCANVAS 07/01/01 CH/KAK CORRI~TIONS ; PERMITNo: 2010580
01/11101 SIS-LG REVISION 08/24/01 pcr 10-407corrections ARNo: 50-029-21762-01
01/17/01 SIS-MD RNAL SEC4, Tl11~ R14E 2007'SN. &46Z EWL
05/18/01 CH/KAK R&A CTDSDETRACK ! BP Exploration (Alaska)
SIZE SPF INTERVAL Opn/Sqz DATE
2" 4 10101 - 10250 O 06/28101
DATE REV BY COIVlVIENTS DATE REV BY COIVIVIENTS
11/19/87 INrrlAL COIVPLErlON 06/28/01 CTD SDETRACK
01/05/00 SlS-QAA CONVERTEDTOCANVAS 07/01/01 CH/KAK CORRI~TIONS
01/11101 SIS-LG REVISION 08/24/01 pcr 10-407 corrections
01/17/01 SIS-MD RNAL
05/18/01 CH/KAK R&A CTD SDETRACK
TREE = 6" ClW
WELLHEAD = MCEVOY
ACTUATOR = AXELSON
'i2,'1~ ' ~'~' '~-~' ' '-' ............................. 54.33'
J~l~' ~'~"~-'~'; .............................. 26.38'
KOP = 3200'
Max Angle = 92 @ 10419'
Datum MD = 9728'
DatumTVD = 8800' SS
13-3/8' CSG, 72~, S95. BTRS, ID = 12.347" I--I 2 9a'
K-10B
Proposed CTD Sidetrack
SAF~'F' ~IOTES: WELL EXCEEDS 70° ~ '!0020' AND
GOES...JRIZONTAL ~ 10141'.
4-1/2" CA~ SSSVN, ID= 3.813" J
GAS LIFT MANDRELS
9067' J'-J 4-1/2' BKR L SLIDING SLV, ID = 3.813"I
7" LNR HGR
Top of Cement
4-1/2" TBG, 12.6#, L-80, I--J
I
9170'
9190'
9197'
9200'
9270'
9135' J-"J 4-1/2" TUBING SEAL A$SY J
9151' J'-J 9-518' TIW HBBP I=KR, ID = 4.750" J
9197' J'--J 4-.1/2" OTIS X NIP, ID = 3.813" J
9201' J~ 3.75" BKR LNR DEPLOYMENT SLV, ID = 3.O0"
9210' Id TOP OF 3-1/2" LNR, 9.3#, FL4S, IO=2.992"
9236' 4-1/2" OTIS XN NIP, MILLED TO 3.80" ID J
9271' Jd 4-1/2" TNV TUBING TAIL, ID= 3.958" J
9278' Jd ELMD 3'1' LOG NOT AVALABLE J
j 9-5/8" CSG, 47#, L-80 BTRS, ID = 8.681" Jd 9479'
J 7" MARKER JOINT I-'~ 9492'
J BKR WHIPSTOCKj~ 9596'
J RA TAG 9606'
7" MILLOUT WINDOW
9599' - 9606'
9622'
9624'
10200'
3-1/2" X 3-3/16" LNR XO, ID= 2.80"
3-3/16" X 2-7/8" LNR XO, ID = 2.37"
Divertor collar/cement bottom
J 7" LNR, 26#, L-80 BTRS, ID = 6.276" 10134' J
PERFORATION SUMMARY
REF LOG: SWS GR/CCL/CNL ON 06/27/01
ANGLEAT TOPPERF: 85 @ 10101'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz I DATE
2" 4 10101 - 10250 isolated proposed
I 2-3/8" Bonzai cmtJpredrilled liner Jd
9624' J--J XO kickoff window J '/'''
9630' id CbP I /I
I ol-I. lO458'1
10525' Jd2-7/8" LNR, 6.16~, L-80 STL, .0058 bpf, ID = 2.37" J
DATE REV BY COMMENTS DATE REV BY COMMENTS I
'11/19/87 INITIAL COMPLETION 06/28/01 CTD SIDETRACK
01/05/00 SlS-QAA CONVERTED TO CANVAS 07101101 CHIKAK CORRECTIONS
01111/01 SIS-LG REVISION 08/24/01 pcr 10-407 corrections
'01117101 SI~-MD FINAL
05118/01 CH/KAK P&A CTD SIDETRACK
PRUDHOE BaY UNIT
WELL: K-10A
PERMIT No: 2010580
aPl No: 50-029-21762-01
SEC 4, T11 N, R14E, 2007' SNL & 462' EWL
BP Exploration (Alas ka)
Permit to Drill 2010580
MD 10525 / TVD
DATA SUBMITTAL COMPLIANCE REPORT
7~8~2003
Well Name/No. PRUDHOE BAY UNIT K-10A Operator BP EXPLORATION (ALASKA) INC
9037 ~ Completion Dat 6/28/2001 -" Completion Statu 1-OIL Current Status 1-OIL
APl No. 50-029-21762-01-00
UIC N
REQUIRED INFORMATION
Mud Log N_go Sample N._~o
Directional Survey ~ \/~
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data Digital Digital
Type Media Fmt
Log Log Run
Name Scale Media No
ED ,9~' GR Gamma Ray
ED 'D/'' GR Gamma Ray
ED ~ Ne Neutron
ED <O'/ GR Gamma Ray
ED D''/' GR Gamma Ray
c-'"' c/'
10223
Directional Survey
MWD Survey
Compensated NEU/GR 2
Directional Survey
Directional Survey
Production Profile 5
1
1
1
1
1
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
FINAL
(data taken from Logs Portion of Master Well Data Maint)
Interval
Start Stop
OH / Dataset
CH Received Number Comments
11/29/2001 -'/10516
11/29/2001 ~,,~0518
11/2/2001 ~fl13'423
11/29/2001 ~13'519
11/29/2001 ~r0517
8/3/2001 ~T0223
8/3/2001 [---10223
7/6/2001
9596 10525 Open
9606 10052 Open
9088 10401 Case
9606 9907 Open
9596 9992 Open
9083 10451 CH
9083 10451 Case
OH
9O78
OH
10454 OH
oh
oh
9000 9350 CH
7/6/2001
8/3/2001
9/10/2001
9/10/2001
8/21/2001
9083-10451, Digital Data
9083-10451
Directional Survey, Paper
Copy
MWD Survey, Digital Data
9078-10454 BL, Sepia
Directional Survey Digital
Data
Directional Survey Paper
Copy
9000-9350 BI, Sepia
Well Cores/Samples Information:
Name
Start
Interval
Stop
Sent
Received
Dataset
Number
Comments
ADDITIONAL INFORMATION
Permit to Drill 2010580
MD 10525 TVD 9037
Well Cored? Y / ~
Chips Received'?~Y / N
Analysis -- ~ / N'
RP.c~.ived~
DATA SUBMITTAL COMPLIANCE REPORT
71812003
Well Name/No. PRUDHOE BAY UNIT K-10A
Operator BP EXPLORATION (ALASKA) INC
Completion Dat 6/28/2001
Completion Statu 1-OIL Current Status 1-OIL
Daily History Received? ~ / N
Formation Tops ~ N
APl No. 50-029-21762-01-00
UIC N
Comments:
Compliance Reviewed By:
Date:
Transmittal Form
BAKER
HUGHES
Baker Atlas
Canada GEOSciences Centre
To: State of Alaska, Alaska Oil & Gas Conservation Commission
333 West 74 Avenue, Suite 100
Anchorage, AK 99501
Attention: Lisa Weepie
Reference :WELL: K-10APB1 Prudhoe Bay North Slope, Alaska
Contains the following'
1 LAS Format disk
1 Film
1 Measured Depth GR print
1 TVD-GR print
Sent By:~ .~NG
Received B.~/~ ~_0/~.
-I
Date: NOV, 23,2001
,_/ Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (403) 537-3767
Baker Atlas
#1300, 401-9th Ave. S.W.
Calgary, Albert a, Canada
T2P 3C5
Direct: (403) 537-3752
FAX: (403) 537-3767
;'--F:£,i: -_ --..:?:_~_-'!~.~
.
i .; ...--7: ............. i_._:_.
"7 ........... ¢" "1
· ..7"-:'2 .... L_ "'q':
-':7..':"' :E ~ .... ---':..'r..: ":--:
.... ',-- ' .' . '-- ." C ~:"2'.'".'.:
::'":- ::'--":::':':
. ";.:---'~.: :7 ;-%~::::' -'"X~Z:
'..- '..'-'i. "'-.Z-Z'.L:. ' ' "
,, :q': i
0il & Gas ~ns.
h~ra~e
Transmittal Form
Baker Atlas
BAKER
HUGHES
Canada GEOSciences Centre
To: State of Alaska, Alaska Oil & Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Attention: Lisa Weepie
Reference :WELL: K-10APB2 Pmdhoe Bay North Slope, Alaska
Contains the following:
1 LAS Format disk
1 Film
1 Measured Depth GR print
1 TVD-GR prim
Sent By: BRENT KING
-- ] -- _
Date: NOV. 23,2001
Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (403) 537-3767
Baker Atlas
#1300, 401-9~ Ave. S.W.
Calgary, Albert a, Canada
T2P 3C5
Direct: (403) 537-3752
FAX: (403) 537-3767
RECEIVED
NOV 2 9 2001
Ataska Oil & Gas Cons. Commission
Anchorage
Transmittal Form
Baker Atlas
Canada GEOSciences Centre
To: State of Alaska, Alaska Oil & Gas Conservation Commission
333 West 7m Avenue, Suite 100
Anchorage, AK 99501
Attention: Lisa Weepie
Reference :WELL: K-10APB3 Prudhoe Bay North Slope, Alaska
Contains the following:
1 LAS Format disk
1 Film
1 Measured Depth GR print
1 TVD-GR print
Ir
HUGH
:.,,~
,~...:. '2Y:' ':'..,,,
~ , 7":""
: ~ ........
r ,
w"5:''': ~ .............. 5':'"' :-:'"'-":
,
, , , ,
'i [ :
Date: NOV. 23,2001
Date:
Sent By: BRENT KING
Received B~7~ ~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (403) 537-3767
Baker Atlas
#1300, 401-9~ Ave. S.W.
Calgary, Albert a, Canada
T2P 3C5
Direct: (403) 537-3752
FAX: (403) 537-3767
RECEiVE£
Transmittal Form
BAKER
HUGHES
Baker Atlas
Canada GEOSciences Centre
To: State of Alaska, Alaska Oil & Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Attention: Lisa Weepie
Reference :WELL: K-10A Prudhoe Bay North Slope, Alaska
Contains the following:
1 LAS Format disk
1 Film
1 Measured Depth GR print
1 TVD-GR print
Sent By: BRENT KING
Received By~~~, ' C~0Oo
Date: NOV. 23,2001
Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (403) 537-3767
Baker Atlas
#1300, 401-9th Ave. S.W.
Calgary, Albert a, Canada
T2P 3C5
Direct: (403) 537-3752
FAX: (403) 537-3767
RECEIVED
!',!,':?'v~ 2 ? 20,01
A~aska 0il & Gas Cons. Commission
Anchorage
ira,?, ..~ ,~._ ~..~..
.....
,":¥= :;~;::
~._....~ ....... ~..._..~.__~ ~
,--.
??2
, ,, :{,2,2.;' ::
..l:} ............
.:. rtt':1%l.~, .l~{~?~:l
:.il
................. 7; .................
~:t'~'.~,,~[l..
~:,
10/31/01
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATI'N: Sherrie
NO. 1582
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Sepia Prints CD
D.S. 7-16A ~kt--I 5.=~ 21433 MCNL 09/12/01 1 1 1
F-05 ! -7 t- O~c;j 21411 RST 09/11/01 1 1 1
F-21 /..~--O 5 ~ 21412 RST 09/08/01 1 1 1
K-10A ~---~'/-- ~)?:~ 21341 MCNL/BORAX 09/11/01 1 1 1
D.S. 1-04A ~:~{~l--I 5~ 21436 MCNL 08/31101 1 1 1
J-13 I OK'C.~-~O~' % 21410 RST 09/06/01 1 1 1
D.S. 1-0;4A- ~Ol--/,c,~, 21435 MCNL 08/30/01 1 1 1
F-40 {~l-/i'/ 21415 RST-SIGMA 09/09/01 I I 1
N-20A iC~tp - I ~/ 21441 USIT 09/21/01 2
L-01 (REDO) ~,~Ol-~:~-/~.~_ 21320 DSI/AIT/PEX 06/19/01 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Bivd.
Anchorage, Alaska 9?508
Date Delivered:
RECEIVED
NOV 0 2 2001
Alaska 0ii & Gas Cons. Commission
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
!
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of well Classification of Service Well
OIL [~] GAS D SUSPENDED ~] ABANDONED E] SERVICE
2. Name of Operator 7. Permit Number
BP Exploration (Alaska), Inc. 201-058
3. Address 8. APl Number
P. O. Box 196612 Anchorage, AK 99519-6612 50-029-21762-01
4. Location of well at surface 9. Unit or Lease Name
2007' FNL, 4817' FEL, Sec. 4, T11N, R14E, UM (asp's 670732, 5975196)t' "" .... . - ..-., .. Prudhoe Bay Unit
At Top Producing Interval ) · '~':- ~ ' 10. Well Number
45' FNL, 2056' FEL, Sec. 5, T11N, R14E, UM (asp's 668164, 5977100) ~'"~f~.;;:'F~ ( K-10A
At Total Depth~_~.,.___. ; 11. Field and Pool
5174' FNL, 1559' FEL, Sec. 32, T12N, R14E, UM (asp's 668658, 5977261) Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
RKB 54.3 feetI ADL 28299 Prudhoe Bay Oil Pool
12. Date Spudded 13. Date T.D. Reached 14. Date JuneC°mp" SusP.2001Or Aband.,~,,.~,-¢~,~ 115. Water Depth, if offshore 16. No. of Completions
May 2, 2001 June 26, 2001 28, ,,,-¢¢''~ u)I N/A feet MSL 1
17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost
10525' MD/9037' TVD 10458' MD/9036' TVD YES [~] No [~I 1967' feetMD 1900' (approx)
22. Type Electric or Other Logs Run
MWD/GR, Mem GR/CCL/CNL, LDL
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED
20" Surface 110' 8 cubic yards concrete
13-3/8" 72# L-80/S-95 Surface 2694' 17-1/2" 1860 cubic ft AS III & 1860 cubic ft AS II
9-5/8" 47# L-80 Surface 9479' 12-1/4" 1973 cubic ft Class G
7" 26# L-80 9197' 9599.5' 8-1/2" 345 cubic ft Class G
3-1/2" x 2-7/8" 9.3# / 6.16# L-80 9200' 10525' 3-3/4" 14.2 bbls Class G
24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" 12.6# L-80 9271' 9151'
(2" PJ carriers, 4 SPF, & Zone 2B)
10101' - 10250' MD; 9036' - 9039' TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
(See Sidetrack Summary for details)
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
7/29/2001 Flowing
Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
7/31/2001 1.0 Test Period '>I 78334
Flow Tubing Casing Pressure Calculated ,OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr)
Press. 2171 24-Hour Rate > 289 22622 0
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips.
RE'CEJVED
· This 10-407 is submitted as directed per the 10-403 form approved April 15, 2001 (permit #201-058)
A ¢0-403 was verbally approved by Tom Maunder on May 2¢, 2001 for operation hutdown (approval # 2 4 200
· A 10-403 was approved on June 15, 2001 for Re-Enter from operation shutdown (approval fi 301-157).
,,~laska Oil & Gas Cons. Commissi
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 COI~TINUED ON REVERSE SIDE
29. ;~ 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and
MEAS. DEPTH TRUE VERT. DEPTH gravity, GOR, and time of each phase.
Top of Sag River Sand 9563' 8715'
Top of Shublik 9616' 8761'
Top of Sadlerochit 9664' 8804' N/A
Top of Zone 3 9757' 8875'
Top of Zone 2 9857' 8943'
Top 25P 9978' 9003'
Top of 24P 10054' 9028'
31. LIST OF ATTACHMENTS
Summary of K-10A CT Sidetrack Drilling Operations + End of Well Survey (including 3 Plugbacks) + updated Schematic.
32. I hereby certify that the, following is true and correct to the best of my knowledge.
~ .'
Signed ~/--~,~ ,.' ,. Title AD&W Coiled Tubing Engineer Date August 23, 2001
t I~'C.,,,'~v /./v -
Ali~tar Sherwood
INSTRUCTIONS
Prepared by Paul Rauf 564-5799.
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands
and leases in Alaska.
Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal,
water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state
in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the
location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
TREE = 6" CEA/
WELLHEAD= MCEVOY
ACTUATOR= AXELSON
KB. I~..-I~V--~- .................. ~"~3~';
'-3Fi EI~EV = .... 26.38'
KOP = 3200'
-~-'~'hgie 92 @"i 0419,'
Datum MD = 9728'
' )atu'm'T~'D = 8800' SS
13-3/8" CSG, 72#, S95, B'I'RS, ID = 12.347"]"-{ 2694'
K-10A
1967'
~. · NOTES: WELL EXCEEDS 70 DEG @ 10020' AND
GOES HORIZONTAL @ 10141'.
4-1/2" CAMCO SSSVN, ID=3.813"I
GAS LIFT MANDRELS
IMinimum ID = 2.44" @ 9624'
3-1/2" X 2-7/8" LNR XO
9067'
Id 4-1/2"BKRL SLIDINGSLV, ID=3.813"I
I 7" LNR HGR TIEBACK I-"{ 9190'
I 7" LNR HANGERI~ 9197'
9270'
9135'
9151'
9197'
9201'
9210'
9236'
9271'
4-1/2" TUBING SEAL ASSY I
9-5/8" TEN HBBP PKR, ID = 4.750"
4-1/2" OTIS X NIP, ID = 3.813" I
3.75" BKR LNR DEPLOY MEI',¢I' SlY, ID = 3.00"
TOP OF 3-1/2" LNR, 9.3#, FL4S, ID = 2.992"
4-1/2" OTIS XN NIP, MILLED TO 3.80" ID I
4-1/2" TIVV TUBING TAIL, ID = 3.958" I
I9278' I-I
9-5/8" CSG, 47#, L-80 BTRS, ID: 8.681" Id 9479'
7" MARKER JOINT I'-'{ 9492'
BKR WHIPSTOCK I--~ 9596'
I-I 9606'
PERFORATION SUMMARY
REF LOG: SWS GR/CCL/CNL OF 6/27/01
ANGLEATTOP PERF: 85 @ 10101'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL I Opn/Sqz DATE
2" 4 10101'- 10250' O 06/28/01
I 7" LNR, 26#, L-80 BTRS, ID = 6.276" Id 10134'
7" MILLOUT WINDOW 9599'- 9606'
9624' ]~3-1/2"x 2-7/8" LNRXO, ID: 2.441"
10458' ]
I 10525' Id2-7/8" LNR, 6.16#, L-80 STL, .0058 bpf, ID= 2.37"
DATE REV BY COMMENTS DATE REV BY COMMENTS
11 / 19/87 INITIAL CO MPL ETLON 06/28/01 CTD S IDETRA CK
01/05/00 SIS-QAA CONVERTED TO CANVAS 07/01/01 CH/KAK CORRECTIONS
01/11/01 SIS-LG REVISION 08/23/01 pcr 10-407 corrections
01/17/01 SIS-MD FINAL
05/18/01 CH/KAK P&A CTD SIDETRACK
PRUDHOE BAY UNIT
WELL: K-10A
PERMIT No: 201-058
APl No: 50-029-21762-01
Sec.4, T11 N, R14E, 2007' SNL & 462' EWL
BP Exploration (Alaska)
BP EXPLORATION Page 1 of 1
Final Well I Event Summary
Legal Well Name: K-10
!Common Well Name: K-10A
Event Name: REENTER+COMPLETE Start Date: 4/30/2001 End Date: 5/18/2001
DATE TMD 24 HOUR SUMMARY
.-.
4/30/2001 (ft) Move rig from F-03a to K-10a.
5/1/2001 9,599.0 (ft) Complete rigup. C/O choke valve on stack. Test BOP.
5/2/2001 9,616.0 (ft) Complete BOP test, Mill window, swap hole to Flopro.
5/3/2001 9,655.0 (ft) Began drilling build, Pull f/MWD, Drill to 9700'.
5/4/2001 9,760.0 (ft) Drill 9700'. Pull for Bit. Drill to 9760'. Pull f/orienter & bit.
5/5/2001 9,860.0 (ft) RIH BHA#6. Drill through Z-3 to 9860'. Trip for bit change.
5/6/2001 9,974.0 (ft) Drill to 9974'. Obseve Iow BR. RIH SR motor. Fish broken motor shaft.
51712001 9,974.0 (ft) Fish unsuccessfully for broken motor shaft. Plug back BS to 9800'.
51812001 9,877.0 (ft) RIH BHA#12, Sidetrack/drill build section to 9877'.
5/9/2001 9,963.0 (ft) Drill t/9885'. C/O orienter. Drill t/9963'. Observe Incl drop/Azm RT.
5/10/2001 10,050.0 (ft) Drill t/10050'. POOH. Observe loose conn on AKO. Plugback BS t/9815'.
5/11/2001 9,893.0 (ft) Drill to 9893'. BHA sheared off @ disconnect sub. POOH BHA#15.
5/12/2001 9,893.0 (ft) Fish for BHA. Fish not passing thru tbg tail. Modify O/S for next run.
5/13/2001 9,893.0 (ft) Made 3 unsuccessful fishing runs to fish broken BHA.
5/14/2001 9,893.0 (ft) Made 1 unsuccessful fishing run to fish broken BHA. Dressed window.
5/15/2001 9,893.0 (ft) Recover fish. Left a dog in the hole. Cut 120' of coil.
5/16/2001 9,893.0 (ft) Ran venturi w/o success. Ran drilling assembly. Stalling. Unable to drill
5/17/2001 9,893.0 (ft) Attempt to fish. Motor shaft broke. P&A.
5/18/2001 9,893.0 (ft) FP well. Disp coil wi N2. N/D BOPE, cap off MV. Rig released @22:00
6/22/2001 9,893.0 (ft) MIRU Nabors 3S
6/23/2001 9,592.0 (ft) NU BOPE and test. M/U BHA #1 TIH. Log tie-in.
6/24/2001 9,850.0 (ft) Cleanout cmt to 9613'. Drill sidetrack ~4 f/9613' to 9850'.
6/25/2001 10,393.0 (ft) Directionally drill f/9850' to 10393'.
6/26/2001 10,525.0 (ft) TD well. PU and ran liner to TD.
6/27/2001 10,525.0 (ft) Ran and cemented liner. Ran memory log
6/28/2001 10,525.0 (ft) Perforate well and freeze protect.
Printed: 8/23/2001 11:25:14 AM
Page 1 of I
Well Events for SurfaceWell K-10
from 5/01/2001to 8/23/200!
Well Date
K-10
K-
10A
K-
10A
K-
10A
Description of Work
08/11/2001 CTD-PREP WORK: EVAL HIGH IAP
08/05/2001 CTD-POST WORK: LEAK DETECT
07/27/2001 CTD-POST WORK: DRIFT PRE LINER TOP LDL (POST CTD)
07/06/2001 CTD-POST WORK: SET GEN GL DESIGN(POST CTD)
K-10 06/20/2001
CTD-PREP WORK: TEST MASTER VALVE/PPPOT-TBG/MITOA
PRE-CTD
Source
AWGRS
PBU
AWGRS
PBU
AWGRS
PBU
AW.GRS
.PB,,U
http://apps~a~aska.bpweb.bp.c~mJsst-dri~ing-we~s/we~-events-query/we~events.asp.../2~ 8/23/2001
BP EXPLORATION Page 1 of 12
Operations Summary Report
Legal Well Name: K-10
'Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours !Activity Code NPT Phase Description of Operations
......
4/30/2001 06:00 - 16:00 lO.00 MOB P I PRE Move rig from F-03a to K-10a.
16:00 - 00:00 8.00 RIGU > PRE Spot rig over well. Rig up.
5/1/2001 00:00 - 06:00 6.00 RIGU P I PRE Continue rigging up unit.
Rig accepted 06:00 5-1-01 due to preventative maintenance of
changing out choke valve on stack.
06:00 - 19:30 13.50 RIGU I P PRE Change out choke valve and complete nipple up of stack.
Load water into pits.
19:30 - 21:30 2.00 RIGU P PRE Set test plug.
21:30 - 00:00 2.50 RIGU P PRE Test BOP. Low test 350# for 5 minutes, 3500# for 10 minutes.
Witness waived by AOGCC inspector Lou Grimaldi.
5/2/2001 00:00 - 06:00 6.00 RIGU P PRE Perform BOP test.
06:00 - 06:20 0.33 RIGU P PRE Rig down testing equipment.
06:20 - 06:50 0.50 RIGU P PRE Pre Spud meeting with crew.
06:50 - 09:00 2.17 RIGU P PRE Pull test plug. Plug obstinant, wait for valve crew forman. Use
higher pressure to pull than normal. Circulate methanol water
out of coil with 2% KCL.
09:00 - 10:15 1.25 STWHIP P WEXlT M/U BHA #1. Baker window milling assembly. OAL=84.92'.
10:15 - 13:30 3.25 STWHIP ~ WEXlT Note; P&A plug previously PT'd 4/6/2001 to 1000 psi for 30
minutes.
RIH w/BHA #1. Displace FP fluid to returns tank.
Hold H2S Drill.
9100', up wt 36k#, RIH wt 27k#
13:30 - 14:00 0.50 STWHIP P WEXlT Tag XN nipple @ 9277' CTM. PU and pump 2.7 BPM, 2350#
ctp. Make 3 passes through. Nipple clean to 3.8".
14:00 - 14:30 0.50 STWHIP 3 WEXlT RIH to tag whipstock. Up wt. 36k#, RIH wt 30k# not pumping.
@ 9641.5', subtract 42' correction to top of window 9599.5'.
14:30 - 19:00 4.50 STWHIP 3 WEXlT Begin milling window from 9599.5' w/KCL. 2.7 bpm, 2150#
free spin, 29.2k# string wt. Flag pipe. Pump periodic pills of
2ppb Biozan.
Milling @ 9601.5', 2.7 bpm, free spin 2450#, 2650# on bottom,
,,,1000# wob. Bottom of window @ 9606'.
19:00 - 22:30 3.50 STWHIP 3 WEXlT Mill 5' of open hole, back ream window. Swap hole to Flopro.
Mill to 9616'. Up wt ,,, 34k#. Drift w/o pumping. Window clean.
Paint EOP flag @ 9400'.
22:30 - 00:00 1.50 STWHIP P IWEXIT Pull out of hole circulating to keep hole full.
5/3/2001 00:00 - 02:30 2.50 STWHIP P WEXlT Continue to POH.
02:30 - 03:30 1.00 STWHIP P WEXlT LID Milling assembly. M/U BHA #2 for build.
03:30 - 08:00 4.50 DRILL P PROD1 RIH w/BHA #2. OAL = 68.99'.
Shallow hole test .... Getting good pulses but computer having
~trouble decoding.
Change out BHI computers. Beings working correctly.
08:00-09:45 1.75 DRILL P PROD1 LogGRTe-nfrom9450. (+14')
09:45 - 10:20 0.58 DRILL ~P PROD1 Orient tool face to 30R.
10:20 - 11:30 1.17 DRILL P PROD1 Drill build from 9616', 2.5 bpm, 3425# free spin. Drilling w/TF
@ 60R, ,,,30 fph, 3600# ctp, 25k# string wt. Drill to 9637'.
Trouble de-coding MWD.
11:30 - 13:30 2.00 DRILL N DFAL PROD1 Trouble shoot signal problem. Add de-foamer to mud. No
improvement. Pulses intermittant.
13:30- 16:45 3.25 DRILL N DFAL PROD1 POH to change MWD.
16:45 - 18:00 1.25 DRILL N DF^L PROD1 Change out MWD guts.
(Pulser failure due to battery malfunction)
18:00- 20:40 2.67 DRILL N DFAL PROD1 RIH w/BHA #3.
20:40- 22:15 1.58 DRILL N DFAL PROD1 Log GR tie-in, -12'.
_
Printed: 7/2/2001 11:29:14 AM
BP EXPLORATION Page 2 of 12
Operations Summa Report
Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
'Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours ActivityCode NPT Phase Description of Operations
5/3/2001 22:15 - 22:45 0.50 DRILL N DFAL PROD1 Orient tool face to 90R.
22:45 - 00:00 1.25 DRILL P PROD1 Drill f/9637' to 9655'.
5/4/2001 00:00 - 06:00 6.00 DRILL P PROD1 Drill f/9655' to 9700' with frequent stalls.
06:00 - 07:45 1.75 DRILL P PROD1 Drilling ahead to 9708' with frequent stalls. Suspect bit trashed
by high pyrite levels in drilled interval.
07:45 - 10:20 2.58 DRILL P PROD1 POH.
10:20 - 11:20 1.00 DRILL P PROD1 Change out bit and motor for 2.75 deg and DS49. Bit gauge
cutters chipped and worn down.
11:20 - 13:20 2.00 DRILL P PROD1 RIH w! BHA #4. OAL= 68.94'.
13:20 - 14:40 1.33 DRILL P PROD1 Log GR tie-in. (Correction = 0')
14:40 - 15:00 0.33 DRILL P PROD1 RIH and tag bottom 9709'.
15:00 - 15:40 0.67 DRILL P PROD1 Drill f/9709' to 9722'. 2.3BPM, 3500 ctp, 70+ fph, 27k# string
weight.
15:40 - 17:40 2.00 DRILL P ~ROD1 Orient TF f/110R to 50R. Tool face flops to Iow right side.
(non-locking)
17:40 - 18:30 0.83 DRILL P PROD1 Drill and push for reactive torque to get desired tool face. Drill
to 9755'.
18:30 - 20:15 1.75 DRILL P PROD1 Work to orient again.
20:15 - 20:30 0.25 DRILL P PROD1 Get high side tool face. Drill 5'.
20:30 - 22:45 2.25 DRILL N DFAL PROD1 Pull up into casing, Do not get clicks. Try running past whip
stock w/pumps off to lay orienter over. Run to bottom w/
pumps on. Get 90R! Get to bottom stall and lose MWD
3ressure transducer. Shut down pump to change transducer
and get Iow-side TF.
'22:45- 00:00 1.25 DRILL N DFAL PROD1 Pull for Orienter.
5/5/2001 00:00 - 01:30 1.50 DRILL N DFAL PROD1 Pull for orienter.
01:30 - 02:30 1.00 DRILL N DFAL PROD1 Change out bit and orienter. Run tricone bit.
02:30 - 04:30 2.00 DRILL N DFAL 'PROD1 Run in hole to 3500'. Shallow hole test shows orienter not
working. POH.
04:30 - 05:15 0.75 DRILL N DFAL I PROD1 Change out Sperry orienter with Weatherford.
05:15-06:00 0.75 DRILL N DFAL PROD1 Run in hole w/ BHA # 6. OAL=57.41'. Shallow hole test at
3600' good.
06:00 - 07:15 1.25 DRILL P PROD1 Service injector.
07:15 - 09:00 1.75 DRILL N DFAL PROD1 Continue running in hole. Correct to EOP flag. Tag bottom
9760'.
09:00 - 09:30 0.50 DRILL P PROD1 Orient TF f/90R to 60R. Get back to bottom and have 90R.
09:30 - 10:40 1.17 DRILL P PROD1 !Drill with maximum WOB to get reactive torque to raise tool
face. Get TF up to 60-70R. Drill to 9820' and see inclination
I coming up. 2.4 bpm, 4000 CTP, 22k# string wt when drilling.
Order new batch of mud.
10:40 - 12:10 1.50 DRILL P PROD1 Orient tool face to 60R.
12:10 - 13:00 0.83 DRILL P PROD1 Drill ahead to 9860' w/3750psi freespin @ 2.5 bpm, 2k WOB,
150 dp on motor, 48 fph ROP.
13:00 - 13:30 0.50 DRILL P PROD1 Orient TF to 30L.
13:30 - 15:15 1.75 DRILL P PROD1 PUH into casing & changeout gasket on pump# 1 liner.
15:15 - 17:30 2.25 DRILL P PROD1 'POOH to cio bit. Flag EOP @ 9400'.
17:30 - 19:00 1.50 DRILL P PROD1 OOH. Rack back BHA and changeout severely worn tricone bit
to M09X PDC (BHA#7).
19:00 - 21:00 2.00 DRILL P PROD1 RIH BHA#7. Shallow hole test @ 3500' - OK. RIH & tie into @
EOP flag (-10' correction). Continue RIH.
21:00 - 21:40 0.67 DRILL P PROD1 Tie into GR marker (-6' correction).
21:40 - 22:15 0.58 DRILL P PROD1 Continue RIH and observe tight spot @ 9789'. Overpulled free.
Suspect underguage hole as tricone bit is 3/16" underguaged.
Printed: 7/2/2001 11:29:14 AM
BP EXPLORATION Page 3 of 12
Operations Summa Report
Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
!Rig Name: Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
,,
5/5/2001 22:15 - 22:40 0.42 DRILL 3 PROD1 Ream hole from 9789' to TD @ 9855' w/60R TF, 3800psi
freespin @ 2.5 bpm, Ok WOB, 150 dp on motor, 158 fph ROP.
22:40 - 22:50 0.17 DRILL ~ PROD1 Wiper tripped to window.
22:50 - 00:00 1.17 DRILL P PROD1 Attempt to orient to 30L-40L. Not getting any clicks. PUH into
casing re-orient.
5/6/2001 00:00 - 01:45 1.75 DRILL 3 PROD1 RIH. Stack out @ 9749'. Passed thru with pumps off. TF
flopped to 60R. Reorient to 30-40L near bottom, & @ 50' off
bottom. No succes. TF flopped back to 40R. Decided to drill
with HS to get pass trouble spot.
01:45 - 03:30 1.75 DRILL P PROD1 Drill from 9855' to 9871' w/HS TF, 3800psi freespin @ 2.5
bpm, 2k WOB, 150 dp on motor, 38 fph ROP. Attemt to orient -
no sucess. PUH to 9800' & orient to 120L. RIH.
03:30 - 06:00 2.50 DRILL P PROD1 1 Click & drill to 9890'. 1 click & drill to 9974'. TF turned f/120L
to 15L, 3700psi freespin @ 2.5 bpm, 2k WOB, 150 - 400 dp on
motor, 39 fph ave ROP. Not achieving required DLS of
32degs/100'. Average DLS achieved = 19.6degs/100'. Decided
to POOH for short radius motor.
06:00 - 08:15 2.25 DRILL N DPRB PROD1 POOH to c/o motor & bit. Flag EOP @ 9400'.
08:15 - 10:00 1.75 DRILL N DPRB PROD1 OOH. L/D BHA#7. P/U BHA#8 with short radius 2.8 degs tilt
and new tricone bit.
10:00 - 12:05 2.08 DRILL N DPRB PROD1 RIH BHA#8. Shallow hole test @ 3500' - OK. RIH & tie into @
EOP flag (-21' correction). Continue RIH. Tag bottom @ 9974'.
12:05 - 12:30 0.42 DRILL P PROD1 PUH. Orient to HS.
12:30 - 13:15 0.75 DRILL P PROD1 Attempt to drill. Observe no motor work. Circulate hole and
decide to POOH to check motor & BHA.
13:15 - 15:15 2.00 DRILL P PROD1 POOH BHA#8. Flag EOP @ 9400'. Monitor well @ 500' - OK.
15:15 - 15:45 0.50 DRILL P PROD1 OOH. Observe broken motor output shaft. Bit and remainder of
shaft left in hole.
15:45 - 18:30 2.75 DRILL N DFAL PROD1 Arrange/wait for fishing tools.
18:30 - 18:55 0.42 DRILL N DFAL !PROD1 M/U fishing tools BHA#9 with 3-5/8" overshot dressed with
1.903" grapple.
18:55 - 22:15 3.33 DRILL N DFAL PROD1 i RIH fishing BHA#9. Tie into EOP flag @ 9400' (-27' correction).
Made several attempts to pass thru window - No success.
Overshot tagging top of whipstock.
22:15 - 00:00 1.75 DRILL N DFAL PROD1 : POOH fishing BHA#9 to P/U bowspring hydraulic centralizer.
5/7/2001 00:00- 00:30 0.50 DRILL N DFAL PROD1 Continue POOH fishing BHA#9.
00:30 - 03:00 2.50 DRILL N DFAL PROD1 I OOH. Rack back BHA#9 & L/D fishing motor. Modify overshot
bowl to 60% OD & 40% ID chamfers. Meanwhile service pump
#2 motor and floor motor.
03:00 - 03:30 0.50 DRILL N DFAL PROD1 'M/U BHA#10 with bowspring hydraulic centralizer & modified
overshot.
03:30 - 06:00 2.50 DRILL N DFAL PROD1 RIH fishing BHA#10 & tie into @ EOP flag (-22' correction).
Continue RIH and tag fish/bottom.
06:00- 06:30 0.50 DRILL N DFAL PROD1 Attempt to engage fish.
06:30 - 10:00 3.50 DRILL N DFAL PROD1 POOH fishing BHA#10 slowly to avoid swabbing and/or fish
disengagement. Flag EOP @ 9400'. Continue POOH. Monitor
well @ 500' - well stable.
10:00 - 11:00 1.00 DRILL N DFAL PROD1 OOH. Fish not recovered - Bit & remainder of shaft still left in
hole.
11:00 - 13:00 2.00 DRILL N DFAL PROD1 Mobilize & PJU tools for cement plugback job. Pump dart thru
coil for correct displacement. Total displacement of coil = 54.5
bbls. Retrieve dart.
13:00 - 14:00 1.00 DRILL N DFAL PROD1 M/U cement nozzle & stinger plug back BHA#11.
Printed: 7/2/2001 11:29:14 AM
BP EXPLORATION Page 4 of 12
Operations Summa Report
Legal Well Name: K-10
'Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/7/2001 14:00 - 18:30 4.50 DRILL N DFAL PROD1 RIH BHA#11 and corrected @ EOP flag (+9'). Pass thru
window & tag bottom @ 9979'. Spaceout nozzle @ 20' off
, bottom & circulate/condition hole prior to cmt job.
18:30 - 19:00 0.50 DRILL N DFAL PROD1 PJSM and HNHM on pumping cement. Emphasize
communication, observation, spill monitoring, fluid
management and volume monitoring/control.
19:00 - 21:00 2.00 DRILL N DFAL PROD1 Dowell pump total of 5 bbls KCL ahead. PT lines to 3000psi -
OK. Pump 7.5 bbls 17 ppg class 'G' cement, & displace w/4.9
bbl KCL & 43.1 bbls mud. POOH @ 50 fpm & lay-in cmt @
lbpm (1:1). POOH to 9300'. Switch to rig pump & displace 50
bbls biozan to nozzle @ 1 bpm. RIH @ 2+ bpm / 30 fpm &
DFAL contaminate cmt down to 9800'.
21:00 - 23:30 2.50 DRILL N PROD1 POOH BH^#11 @ 2.5+ bpm / 60 fpm chasing contaminated
cmt OOH. Flag EOP @ 9400'. Continue POOH. Monitor well @
500' - well stable.
23:30- 00:00 0.50 DRILL N DFAL PROD1 Rack back injector, L/D BHA.
5/8/2001 00:00 - 01:30 1.50 DRILL N DFAL PROD1 M/U swizzle stick & flush BOP stack. Clean sensators & tees.
01:30 - 03:00 1.50 DRILL 3 PROD1 R/U to test BOPE 1 day early. Set 2WCV w/DSM lubricator.
03:00 -09:30 6.50 DRILL ~ PROD1 Prime test pump. Test BOPE. Testing witnessed by AOGCC
rep Chuck Scheve.
09:30 - 11:45 2.25 DRILL ~ PROD1 DSM R/U and pull 2WCV.
11:45 - 13:00 1.25 DRILL N DFAL PROD1 M/U BHA#12 with short radius, 2.83 tilt motor and M09 bit.
13:00 - 15:45 2.75 DRILL N DF^L PROD1 RIH BH^#12. Shallow hole test @ 600' - OK. RIH & tie into @
EOP flag (+0.5' correction). Continue RIH.
15:45 - 17:00 1.25 DRILL N DFAL PROD1 Tie into GR marker (-2' correction).
117:00 - 17:15 0.25 DRILL N DFAL PROD1 Continue RIH and tag-up @ 9798'.
17:15 - 19:15 2.00 DRILL N DFAL PROD1 Attempt to orient TF to 60R - no clicks near bottom probably
due to high bend motor in open hole. PUH to window &
reorient - still no cliCks. PUH into csg & reorient - getting 3 for 3
(orienter works in csg). RIH to bottom.
19:15 - 19:30 0.25 DRILL N DFAL PROD1 Drill from 9798' to 9807' w/60-70R, 3600psi freespin @ 2.5
bpm, 2k WeB, 200 dp on motor, 54 fph ReP.
19:30 - 20:30 1.00 DRILL N RREP PROD1 Mud pumps faulty. PUH into csg and repair mud pumps.
20:30 - 21:15 0.75 DRILL N DFAL PROD1 RIH and check TF. PUH into csg and orient. RIH and stacked
out @ 9620. Worked past tight spot. Confirm TF @ 90L. Orient
& get 1 for 3 near bottom. 50' wiper reorient to 50-60R.
21:15 - 00:00 2.75 DRILL N DFAL PROD1 Drill ahead to 9877' w/40-60R, 3600psi freespin @ 2.5 bpm, 2k
WeB, 150-200 dp on motor, 20-30 fph ReP. Had frequent
motor stalls.
5/9/2001 00:00 - 00:30 0.50 DRILL N DF^L PROD1 Drill to 9880', TF 40R, ReP 6 fph.
00:30 - 02:40 2.17 DRILL N DFAL PROD1 Orient TF to 60-70L, unable to get clicks near bottom, end up
having to pull into casing.
02:40 - 03:00 0.33 DRILL N DFAL PROD1 Drill 5' @ 90L @ 12 fph.
03:00 - 04:15 1.25 DRILL 'N DFAL PROD1 TF flopped to HS, time drill W/HS TF. Bottoms up showing
formation sand. TF flopped to 50R, unable to orient.
04:15 - 07:15 3.00 DRILL IN DFAL PROD1 POOH f/orienter.
07:15 - 07:45 0.501 DRILL N DFAL PROD1 LID BHA #12.
07:45 - 08:00 0.25 DRILL N DFAL PROD1 Pre job Safety meeting on cutting coil. Emphasis on body
positioning, communication & line of sight w/regard to winch
operator.
08:00 - 10:45 2.75 DRILL N DFAL PROD1 Rig up & cut 70' off coil. Weld on new coil connector, pull test &
pressure test same, OK. Adjust main clutch for hydraulic
system.
Printed: 7/2/2001 11:29:14 AM
BP EXPLORATION Page 5 of 12
Operations Summa Report
p,
Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
!Rig Name: Rig Number:
Date From - To Hours ActivityCode NPT Phase Description of Operations
,,,
5/9/2001 10:45 - 11:30 0.75 DRILL N DFAL PROD1 'P/U BHA #13, surface test orienter, OK.
11:30 - 14:15 2.75 DRILL N DFAL PROD1 RIH, shallow hole test, OK. Add 10' at EOP flag.
14:15 - 15:30 1.25 DRILL N DFAL PROD1 Log gamma tie in, subtract 5' correction.
15:30 - 15:50 0.33 DRILL N DFAL PROD1 IContinue RIH and tag-up @ 9880'.
15:50 - 18:50 3.00 DRILL N DFAL PROD1 I PUH & attempt to orient TF to 30L, no success. Work hole.
PUH to window & reorient to 30L. RIH.
18:50 - 20:30 1.67 DRILL N DFAL PROD1 Time drilled from 9881' to 9890' @ 5 fph & 35L. Confirmed
departure from old hole.
20:30 - 00:00 3.50 DRILL N DFAL PROD1 Drilled ahead to 9963' w/40-50L, 3475psi freespin @ 2.5 bpm,
2-3k WeB, 125-425 dp on motor, 30-62 fph ReP. Observe
hole angle dropping & azimuth turning right. Reviewed situation
& decided to drill ahead on 90L to see if hole did actually turn
left and/or build angle.
5/10/2001 00:00 - 01:00 1.00 DRILL N DFAL PROD1 Trouble getting oriented to 90L due to high degree motor &
hole direction.
01:00 - 01:30 0.50 DRILL N DFAL PROD1 Drill ahead f/9964'-9969'...TF flopped to 30L.
01:30 - 03:30 2.00 DRILL N DFAL PROD1 Pick up, orient & work down several times until desired TF is
achieved.
03:30 - 05:45 2.25 DRILL N DFAL PROD1 Drill ahead f/9969'-10,050'. TF 90-100L. 2K WeB, 150 dp on
motor. Starting to see left turn @ 9991', & inclination coming
up. @ 10,021', turning right .... w/90-100L TF.
05:45 - 08:15 2.50 DRILL N DFAL PROD1 POOH to check BHA & evaluate situation.
08:15 - 08:45 0.50 DRILL N DFAL PROD1 Discover Weatherford motor connection backing out just above
bent sub, causing erratic drilling patterns.
08:45 - 09:30 0.75 DRILL N DFAL PROD1 M/U stinger & nozzle f/plugging back.
09:30 - 12:30 3.00 DRILL N DFAL PROD1 RIH w/nozzle, subtract 5' @ EOP flag.
12:30 - 14:15 1.75 DRILL N DFAL PROD1 Condition hole to 10,054', (tagged up), rig up cementers & spot
trucks.
14:15 - 14:45 0.50 DRILL N DFAL PROD1 Prejob w/emphasis on communication & awareness. All
pertinent observations during job to be communicated via radio
& acknowledged. Any problems, stop & adjust. Designated
spotter f/all trucks.
14:45 - 16:30 1.75 DRILL N DFAL PROD1 Pump 5 bbls water ahead, PT lines to 3500 psi, OK. Pump 9
bbls cement, 5 bbls water & 25 bbls biozan. Displace w/mud.
With 1 bbl out @ 10,050', (46.5 bbls displaced), pull OOH @
45 fpm pumping @ .8 bpm to above window @ 9600'. Increase
pump rate to 2.5 bpm & wash down to 9805'. Calculated top of
cement @ 9815'. CIP @ 1600 hrs.
16:30 - 19:30 3.00 DRILL N DFAL PROD1 POOH, flag EOP @ 9400', jet each GLM on way OOH.
Monitor well @ 500'-well stable.
19:30- 20:00 0.50 DRILL N DFAL PROD1 Rack back injector, L/D BHA.
20:00 - 21:30 1.50 DRILL N I DFAL PROD1 M/U swizzle stick & flush BOP stack. Clean sensators & tees.
Clean suction screens.
21:30 - 00:00 2.50 DRILL N DFAL PROD1 W.O.C. Meanwhile changeout mud end on pump #1, install
control valve for new tugger and string in new tugger.
5/11/2001 00:00- 03:45 3.75 DRILL N DFAL PROD1 Continue to WOC.
03:45 - 04:30 0.75 DRILL N DFAL PROD1 M/U BHA #15, surface test orienter, OK.
04:30 - 07:15 2.75 DRILL N DFAL PROD1 RIH w/BHA #15, shallow hole test, OK. Zero correction @
DF^L EOP flag @ 9400'.
07:15 - 08:30 1.25 DRILL N , PROD1 Log gamma tie in, subtract 10' correction. Some trouble
decoding MWD signal initially, had to reboot system several
times.
08:30 - 09:00 0.50 DRILL N DFAL PROD1 Continue to RIH, tag TOC @ 9805'. Cement compressive
Printed: 7/2/2001 11:29:14 AM
BP EXPLORATION Page 6 of 12
Operations Summa Report
Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/11/2001 08:30 - 09:00 0.50 DRILL N DFAL PROD1 strength @ 0500 was 4700 psi.
09:00 - 10:00 1.00 DRILL ~N DFAL PROD1 Attempt to orient TF to 30L, flopping each time to right side due
to direction of old hole. Settle for 60L.
10:00 - 12:40 2.67 DRILL N DFAL PROD1 Time drilling @ 6'/hr, drill to 9827'. Sample back f/9825' over
95% formation, very little cement.
12:40- 13:15 0.58 DRILL N DFAL PROD1 Orient (1) click.
13:15 - 18:20 5.08 DRILL N DFAL PROD1 Drill ahead to 9881' w/50-60L, 3500psi freespin @ 2.5 bpm, 2k
WeB, 200 dp on motor & 20 fph ave ReP.
18:20 - 20:30 2.17 DRILL N DFAL PROD1 Drill ahead to 9893'. Attempt to orient - no success. PUH to
9830' & reorient. Attempt to RIH to bottom. Lost 1600 psi circ
~ressure and stacked up @ 9875'. Troubleshoot surface
equipment & pumps - OK.
20:30 - 23:30 3.00 DRILL N DFAL PROD1 POOH to check BHA & evaluate situation. Paint EOP flag &
observe well @ 9400' - OK. Monitor well @ 500' - well stable.
23:30 - 00:00 0.50 DRILL N DFAL PROD1 OOH. Discover BHA was broken off @ inner housing of
disconnect sub & disconnect piston is bent. TOF is half of
disconnect sub with parted inner housing. Release dogs
possibly inside housing. Plan to fish housing with a short catch
spear before fishing disconnect with a GS spear.
5/12/2001 00:00- 04:30 4.50 FISH N DFAL PROD1 Continue to wait on fishing tools.
04:30- 05:15 0.75 FISH N DFAL PROD1 M/U fishing BHA#16.
05:15 - 07:15 2.00 FISH N DFAL PROD1 RIH, correct @ EOP flag, add 5'.
07:15 - 07:45 0.50 FISH N DFAL PROD1 Continue in, tag up @ 9818'. ..... (kick off point on cement plug).
07:45 - 08:00 0.25 FISH N DFAL !PROD1 Tagged (2) times, pumping 3/4 bpm & 1 bpm, set down 2500
lbs. Set down (2) times w/pump off @ 9819'. 44K up wt, 27K
down.
08:00 - 10:30 2.50 FISH N DFAL PROD1 POOH, flag EOP @ 9400', monitor well @ 500', well stable.
10:30 - 11:00 0.50 FISH N DFAL PROD1 Check BHA, cement on spear, no indication of latch up. Add
knuckle joint to BHA.
11:00 - 14:00 3.00 FISH N DFAL PROD1 RIH w/fishing BHA #17, add 6' @ EOP flag, tag @ 9819'.
14:00 - 15:00 1.00 FISH N DFAL PROD1 !Set down 2-3K, pump on, pump off, unable to get below 9819'.
P/U w/pump off, 16K overpull to 60K. Work pipe w/pump on
@ 1 bpm, pull free @ 60K up wt.
15:00 - 15:30 0.50 FISH N DFAL PROD1 POOH, flag pipe @ 9400', overpul110K @ 9277', (tbg tail).
15:30 - 17:30 2.00 FISH N DFAL PROD1 Attempt to work past tubing tail, try various techniques, all
failed. Limited overpull to 10-12K. Discuss w/town & opt to go
back down & disconnect lower disconnect, & RIH w/GS fishing
tool w/skirt attachment, (being made @ machine shop).
17:30 - 18:00 0.50 FISH N DFAL PROD1 RBIH, tag @ 9769', set down 5K. (Setting down on cement
plug K/O point @ 9818' minus the drilling BHA brings us to
around 9769', so it appears we engaged the entire fish.) Prep
to drop 5/8" disconnect ball.
18:00 - 18:45 0.75 FISH N DFAL PROD1 Load/drop 5/8" disconnect ball & pump down CT. Displace to
ball seat at 1.8 bpm & land at 43.2 bbl away.
18:45 - 20:15 1.50 FISH N DFAL PROD1 Pressure up to 4500 psi - no disconnect. Bled off pressure &
retry several times b/w 3500 & 4500 psi - no success. Finally
disconnected while working string @ 4750 psi.
20:15 - 23:30 3.25 FISH N DFAL PROD1 POOH. Paint EOP flag & observe well @ 9400' - OK. Monitor
well @ 500' - well stable.
23:30 - 00:00 0.50 FISH N DFAL PROD1 OOH. Rack back fishing BHA#17. Modify overshot bowl for
next fishing run. Meanwhile service injector.
5/13/2001 00:00 - 03:00 3.00 FISH N DFAL PROD1 Continue to replace elastomers, clean & inspect gripper blocks.
03:00- 04:00 1.00 FISH N DFAL PROD1 M/U fishing BHA#18.
Printed: 7/2/2001 11:29:'14 AM
BP EXPLORATION Page 7 of 12
Operations Summary Report
i Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
5/13/2001 04:00 - 06:30 2.50 FISH N DFAL PROD1 RIH w/fishing BHA, add 6' correction @ EOP flag, tag fish @
9767'. 41.5K up, 28K down w/pumping 1/3 bpm/1000 psi.
06:30 - 06:45 0.25 FISH N DFAL PROD1 Set down 3-4K on fish w/pumping @ 1/3 bpm/1000 psi. Set on
fish f/5 min, shut down pump, wait 3 rain & P/U, 45K up wt. wi
pump off. See 2K overpull thru window.
06:45 - 10:30 3.75 FISH N DFAL PROD1 POOH pumping min rate, paint EOP flag @ 9400', no bobbles
thru tbg. tail.
10:30 - 12:00 1.50 FISH N DFAL PROD1 OOH, no fish. Inspect BHA, see indication on guide bushing of
top of fish. No indication of having been latched up. Discuss
options. Bevel out end of guide bushing.
12:00 - 12:30 0.50 FISH N DFAL PROD1 M/U fishing BHA#19.
12:30 - 14:30 2.00 FISH N DFAL PROD1 RIH, add 9' correction @ EOP flag. 37.5K up, 25K dn w/
pumping 1/3 bpm/1000 psi, 39.5K up, 26K dn wi pump off. Tag
@ 9767'.
14:30 - 15:15 0.75 FISH N DFAL PROD1 Set down 4K & see weight back, slipped over top of fish w/
guide bushing. Pump @ lbpm & set down 5K to 9769.6'. Shut
down pump & P/U, 41.5K up wt. Slack off to 9769.6', 5-6K,
bring pump on for a few minutes & shut down pump. Wait 6-7
minutes & P/U. 41.5K up wt.
15:15 - 18:30 3.25 FISH N DFAL PROD1 POOH, filling hole down the back side. Flag EOP @ 9400'.
Flow check @ 7000'. OK. Hole taking proper fill. Flow check @
500' OK. Continue POOH.
18:30 - 19:00 0.50 FISH N DFAL PROD1 OOH. Observe no fish. Inspect BHA, see marks on guide
bushing indicating contact w/TOF. No indication of latching
onto fish. Decide to make an oversot/spiral grapple run.
19:00 - 19:30 0.50 FISH N DFAL PROD1 M/U fishing tools BHA#20 w/3-5/8" overshot dressed w/2-1/8"
spiral grapple.
19:30 - 21:30 2.00 FISH N DFAL PROD1 RIH BHA#20. Add 3' correction @ EOP flag. 40k up & 27k dn
Wts wi pumping @ 0.3 bpm/800 psi. 41k up & 26.5k dn Wts w/
pump off. Tag TOF @ 9765'.
21:30 - 22:30 1.00 FISH N DFAL PROD1 Attempt several times to engage fish with max 10k set down wt
to 9769', with & without pumping - no significant overpulls,
suspect no bite. Pump on TOF @ 1.25 bpm for 5 rains & retry,
no catch. Pump @ 2.6 bpm & work the pump to kick guide
bushing over fish - no success. Decide to run a fishing motor.
22:30 - 00:00 1.50 FISH N DFAL PROD1 POOH BHA#20. Paint EOP flag & observe well @ 9400' - OK.
No bobbles thru window & tubing tail. Continue POOH.
5/14/2001 00:00 - 01:15 1.25 FISH N DFAL PROD1 Continue OOH, monitor well @ 500', OK.
01:15 - 02:00 0.75 FISH N DFAL PROD1 No fish, M/U BHA #21
02:00 - 04:00 2.00 FISH N DFAL PROD1 RIH w/fishing BHA, correct @ EOP flag, subtract 12'.
04:00 - 04:15 0.25 FISH N DFAL PROD1 Tag up @ whipstock @ 9606' w/pump off, P/U & pump, work
thru, OK.
04:15 - 05:00 0.75 FISH N DFAL PROD1 Tag fish @ 9762', (depth corrected only to flag), work & pump
to rotate over fish. Stack as much as 10k to 9765'. Note 1.5 K
increase in up wt. Work & stack 10 K w/pump off.
05:00 - 05:30 0.50 FISH N DFAL PROD1 POOH, no bobbles @ tbg tail.
05:30 - 06:45 1.25 FISH N DFAL PROD1 'RBIH, tag top of whipstock, (obviously no fish on), attempt to
work overshot past whipstock, no success.
06:45 - 08:30 1.75 FISH N DFAL PROD1 'POOH, monitor well @ 500', OK.
08:30 - 11:00 2.50 FISH N DFAL PROD1 OOH, inspect BHA, note grooves & markings indicating metal
Ito metal contact up to the grapple, discuss & run to Baker shop
to match up markings w/7" retrievable whipstock. Appears we
got behind top of whipstock tray w/overshot.
Printed: 7/2/2001 11:29:14 AM
BP EXPLORATION Page 8 of 12
Operations Summa Report
Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
.--,
5/14/2001 11:00 - 14:00 3.00 FISH N DFAL PROD1 Round up components to dress out window.
14:00 - 15:00 1.00 FISH N DF^L PROD1 M/U window dressing BH^#22.
15:00 - 18:00 3.00 FISH N DFAL PROD1 RIH w/BHA #22, shallow hole test, OK. Orienter, OK.
18:00 - 18:20 0.33 FISH N DFAL PROD1 Orient to HS, orienter working click f/click. RIH to dress
window.
18:20 - 19:00 0.67 FISH N DFAL PROD1 Tag-up @ 9612' and wash down to 9617'. Dress window with
very little motor work.
19:00- 19:10 0.17 FISH N DFAL PROD1 Reorient to H$.
19:10 - 20:00 0.83 FISH N DFAL PROD1 Dress window @ various TFs. No motor work in and out of
window.
20:00 - 20:30 0.50 FISH N DFAL PROD1 Observe slight motor work @ 9612'. Continue dressing window
and drifted in/out with and without pumps till no motor work
observed.
20:30 - 22:45 2.25 FISH N DFAL PROD1 POOH window dressing BHA#22. Flag EOP and flow check @
9400' - OK. Flow check @ 500' - OK. Continue POOH.
22:45- 23:20 0.58 FISH N DFAL PROD1 OOH. L/D BHA#22.
23:20 - 00:00 0.67 FISH N DF^L PROD1 M/U fishing BHA#23 with 2.5" GS spear.
5/15/2001 00:00 - 02:30 2.50 FISH N DFAL PROD1 RIH w/GS BHA. Correct @ EOP flag, subtract 16'. 24K dn,
39K up wt. Tag Fish @ 9760'.
02:30 - 03:00 0.50 FISH N DFAL PROD1 Set down 5K w/pump off (3) times & P/U, no clear indication of
fish. Bring on pump @ 2 bpm, 4000 psi & set down 8K on fish.
Shut down pump & P/U, 10K overpull to 49K & sudden loss of
weight. 39-40 K up wt.
03:00 - 06:00 3.00 FISH N DFAL PROD1 POOH filling down back side. Flag EOP @ 9400', monitor well
@ 500'
06:00 - 07:00 1.00 FISH N DF^L PROD1 L/D BH^. Recovered 2 1/8" disconnect, knuckle joint, spear &
broken inner mandrel of disconnect that failed initially on 5/11.
Left in hole is lower half of failed disconnect & (3) dogs along
with the drilling BH^.
07:00 - 07:30 0.50 FISH N DFAL PROD1 Prejob on cutting coil. Emphasis on communication & body
positioning. Line of sight for winch operator.
07:30 - 11:00 3.50 FISH N DFAL PROD1 Rig up to & cut 120' of coil. Weld on new connector, pull &
pressure test same, OK.
11:00 - 11:45 0.75 FISH N DFAL PROD1 M/U BH^ to fish GS profile in disconnect.
11:45 - 13:45 2.00 FISH N DFAL PROD1 RIH w/fishing BHA, subtract 5' correction @ EOP flag. 39K
upwt, 27.5K down w/pump @ .4 bpm, 1000 psi. 41K up, 28K
down w/pump off. Tag fish @ 9764'.
~13:45 - 14:15 0.50 FISH N DFAL PROD1 Set down 8K, pick up, no clear indication of fish. Bring pump on
@ 2bpm, set down 10K, shut down pump. Pick up to 59K, (19K
overpull & let jars go off, pull to 43K & free. Set down w/pump
off to 10K under & pick up. 43-44K up wt w/pump off.
14:15 - 17:30 3.25 FISH N DFAL PROD1 POOH filling down back side, paint EOP flag @ 9400'. Attempt
to test choke manifold w/POOH, repair test pump.
17:30 - 18:30 1.00 FISH N DFAL PROD1 L/D fishing BHA. Recovered entire fish except for (1) dog off of
disconnect..1" x l"x 3/4".
18:30 - 20:00 1.50 BOPSUF P PROD1 Wait on DSM to set TWC. RD snubbing table. Grease stack
and choke manifold valves.
20:00 - 20:30 0.50 BOPSUF P PROD1 P/U and install TWC
20:30 - 20:40 0.17 BOPSUF P PROD1 PJSM.
20:40 - 22:30 1.83 BOPSUF. P PROD1 C/O stripper.
22:30 - 00:00 1.50 BOPSUF.N RREP PROD1 RU test pump. Pump not working. Displace coil to KCI.
5/16/2001 00:00 - 01:30 1.50 BOPSUF.P PROD1 Continue displacing coil to KCI. Safety meeting to discuss
change on procedure to test BOPE. L/D test joint.
Printed: 7/2/2001 11:29:14 AM
BP EXPLORATION Page 9 of 12
Operations Summa Report
,.
Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Activity~ Code NPT Phase Description of Operations
.....
5/16/2001 01:30 - 06:00 4.50 BOPSUR P PROD1 P/T BOPE.
06:00 - 07:30 1.50 BOPSUIq N SFAL PROD1 Change out 2 3/8" combi rams.
07:30 - 09:30 2.00 BOPSUR ~ PROD1 Resume testing BOPE. Drawdown test on accumulator.
09:30 - 10:00 0.50 BOPSUI; ~ PROD1 'Pull 2 way check.
10:00 - 11:00 1.00 FISH N DF^L PROD1 M/U venturi BHA, circulate KCL out of coil.
11:00 - 13:00 2.00 FISH N DF^L PROD1 RIH, correct @ EOP flag, add 7'.
13:00 - 13:30 0.50 FISH N DFAL PROD1 Tag @ 9605', (whipstock), P/U brng on pump @ 2 bpm & drop
thru OK. Circulate @ 2.7 bpm, 3300 psi f/9700'-9890', (TD).
Tagged @ 9817', (kick off point), & picked up once & dropped
thru OK. Continue to 9890' pumping 2.7 bpm running in @
20-30 fpm. P/U & retag @ 9890' & POOH to window @ 20-30
fpm pumping 2.7 bpm.
13:30 - 15:45 2.25 FISH N DFAL PROD1 POOH, flag EOP @ 9400', monitor well @ 500', OK.
15:45 - 17:00 1.25 DRILL N DF^L PROD1 L/D venturi BHA, junk basket 1/2-3/4 full, hydrated mud &
cement, lost dog not recovered. M/U drilling BHA.
17:00 - 19:00 2.00 DRILL N DF^L PROD1 RIH w/drilling BHA, shallow hole test, OK, orienter OK.
19:00- 19:15 0.25 DRILL N DF^L PROD1 Tie into flag. No correction.
19:15- 19:40 0.42 DRILL N DFAL PROD1 Tie in w/gamma. Add 4'. 41 K up. 27K dwn.
19:40 - 20:15 0.58 DRILL N DFAL PROD1 RIH to 9822'. stack 6k. Try with pumps down. Bring pumps on.
Check TF Orient to 90L. Pass through window. Tag bottom
dry @9895'.
20:15 ~ 20:40 0.42 DRILL N DFAL PROD1 Orient to 40R.
20:40 - 21:15 0.58 DRILL N DFAL PROD1 Start new mud. Attempt to drill. Stalling several times @9892'.
(1) 10K overpull, acts like missing dog on bottom.
21:15 - 00:00 2.75 DRILL N DFAL PROD1 POH to p/u venturi junk basket. Flag EOP@8485'. Monitor
well. OK.
5/17/2001 00:00-01:00 1.00 DRILL N DFAL PROD1 Monitor well @500'. OK. OOH. LD drilling assembly.
01:00 - 02:15 1.25 DRILL N DFAL PROD1 P/U venturi junk basket.
02:15- 03:45 1.50 DRILL N DFAL PROD1 RIH to EOPi Correct-14'.
03:45 - 04:30 0.75 DRILL N DFAL PROD1 Continue RIH. Pass thru window. Pump @1.37 bpm. 38K dn
wt. 29 K up wt. RIH at 30 fpm. Tag bottom at 9892'. Bring
pumps to maximum rate 2.8/3740. Work venturi several
times.
04:30 - 07:00 2.50 DRILL N DFAL PROD1 POH pumping at maximum rate. Flag EOP at 8485'. Monitor
well. OK. POH
07:00 - 07:45 0.75 DRILL N DFAL PROD1 L/D BH^, no dog in the venturi basket, some small cement
chunks & metal shavings.
07:45 - 10:30 2.75 DRILL N DFAL PROD1 Evaluate options & opt to run wash over shoe w/cutrite on
venturi junk basket w/1 degree motor & orienter, no MWD.
N M/U same.
10:30 - 13:15 2.75 DRILL DFAL PROD1 RIH w/BHA #28, subtract 13' @ EOP flag. Tag up @
whipstock @ 9605', orient (2) clicks & thru. Tag up @ 9805,
(cement K/O point), orient (4) clicks & thru. Tag @ 9891'. 38K
up wt, 27K down.
13:15 - 13:45 0.50 DRILL N DFAL PROD1 Pick up, bring on pump @ 2.5 bpm, 4000 psi, drill to 9894' w/
300 psi motor work, very light WOB, stall (2) times, bleed &
pick up. POOH to window, @ 9670' note 1100 psi loss, looks
like output shaft broke.
13:45 - 17:00 3.25 DRILL N DF^L PROD1 POOH, paint flag @ 9400', monitor well @ 500', OK.
17:00 - 17:45 0.75 DRILL N DF^L PROD1 OOH, output shaft broke just below nut, 4 3/4" up inside the
housing. L/D BH^.
17:45 - 18:30 0.75 DRILL N DF^L PROD1 Discuss w/town, opt to cement to window & move off.
18:30- 21:00 2.50 DRILL N DFAL PROD1 Call cementers. Clear floor from fishing tools. P/U cement
Printed: 7/2/2001 11:29:14 AM
BP EXPLORATION Page 10 of 12
Operations Summa Report
Legal Well Name: K-10
'Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
........
5/17/2001 18:30 - 21:00 2.50 DRILL N DFAL PROD1 nozzle
21:00 - 22:20 1.33. DRILL N DFAL PROD1 RIH w/cement nozzle.
22:20-23:15 0.92 DRILL N DFAL PROD1 RIHtoEOP. Correct-19'. 37Kwtup. 27kwtdn. Tagflsh
@9809'. Atempt to push fish to bottom. Stack 12k. Unable to
push it down.
23:15 - 23:30 0.25 DRILL N DFAL PROD1 PJSM. Discuss procedure. Emphasis on communication and
high pressure pumping.
23:30 - 00:00 0.50 DRILL N DFAL PROD1 Pump 30 bbls of KCl. Pump 5 bbls of water. PFF to 4000 psi.
OK. Pump 12 bbls of cement follow by 5 bbls of water. Pump
25 bbls of biozan. Displace with KCI. W/1 bbl cmt out @
nozzle @ 9808', POOH at 45 fpm, reduce pump rate @0.8
bpm. Pull to 9000'.
5/18/2001 00:00 - 01:00 1.00 DRILL N DFAL PROD1 Wash out from 9590'. Chase cement with biozan, recovered
310 bbls of mud. sent to M-I plant.
01:00 - 03:00 2.00 DRILL N DFAL PROD1 POH to 2000'.
03:00 - 04:45 1.75 DRILL N DFAL PROD1 FP fl2000'.
04:45- 05:30 0.75 DRILL N DFAL PROD1 LID cementing BHA.
05:30 - 06:00 0.50 DRILL P PROD1 Set BPV
06:00 - 08:30 2.50 DRILL P PROD1 M/U swizzle stick & flush all cement out of BOPE & associated
plumbing.
08:30 - 12:30 4.00 TA P COMP Clean pits w/waiting for N2 truck.
12:30 - 12:45 0.25 TA P COMP PJSM on pumping N2. Focus on pressure, choke operation,
communication, & associated hazards.
12:45 - 14:00 1.25 TA P COMP Displace coil w/N2.
14:00 - 18:00 4.00 TA P COMP Break off nozzle, cut off coil connector, finish cleaning pits,
suck out cuttings box, secure coil to reel.
18:00 - 21:00 3.00 TA P COMP Continue cleaning pits. Lay over coil.
21:00 - 22:00 1.00 TA P COMP Nipple down BOP's. Rig released @22:00
22:00 - 00:00 2.00 TA P COMP Lay down sensors. RD pumps, cat walk.
6/22/2001 17:30 - 23:00 5.50 RIGU P PRE Have given AOGCC 24 hr notice of impending BOP test.
Nabors 3S arrive on location from DS 18-32A. Move over K10A
and rig up. Accept rig at 23:00 hrs 6-22-01.
23:00 - 00:00 1.00 RIGU P PRE N/U BOPE.
6/23/2001 00:00 - 04:30 4.50 RIGU P PRE Nipple up BOPE. Dowell unit #4 accepted at 0000 hrs. R/U
same.
04:30 - 06:00 1.50 WHSUB P SURF Attempt to pull BP¥ and install 2-way check. Unable to latch
onto BPV. Pump out stack and can see that there is an ID
restriction at the bit guide, between stack and master valve. Bit
guide ID 4.25", puller 5.25".
06:00 - 08:00 2.00 BOPSUE N HMAN SURF N/D BOP at the master valve. Remove bit guide and No/U
08:00 - 09:00 1.00 WHSUR P SURF Remove BPV and install TWC.
09:00 - 13:30 4.50 BOPSUE P SURF Test BOP's. Witnessed by AOGCC - Chuck Scheve
13:30 - 14:30 1.00 DRILL P PROD1 Pick up injector.
14:30 - 15:00 0.50 DRILL P PROD1 Remove TVVC.
15:00 - 16:30 1.50 DRILL P PROD1 ~Change out injector packing. (Prep next BHA tools.)
16:30 - 16:45 0.25 DRILL P PROD1 PT DS lines and inner reel valve to 4000 psi.
16:45 - 17:30 0.75 DRILL P PROD1 Slack management. Pump back e-line. Cut 54' coil.
17:30 - 20:00 2.50 DRILL P PROD1 Make-up BHI CTC. Pull test to 40K# and PT to 3600 psi.
20:00 - 20:45 0.75 DRILL P PROD1 Pick up BHA #1. Surface test OXP.
20:45 - 21:15 0.50 DRILL !P PROD1 Stab on injector. Open circ sub and pump forward coil volume
for slack management.
21:15-23:15 2.00 DRILL P PROD1 TIH
23:15 - 00:00 0.75 DRILL !p PROD1 Log tie in +2.3'
Printed: 7/2/2001 11:29:14 AM
,,_
BP EXPLORATION Page 11 of 12
Operations Summa Report
Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
6/24/2001 00:00 - 00:15 0.25 DRILL P PROD1 TIH after log tie-in. Tagged TOC at 9606'. (bottom of
whipstock)
00:15 - 02:00 1.75 DRILL P PROD1 Cleanout tray and window area. Drill cement to 9613'.
02:00 - 03:50 1.83 DRILL P PROD1 TOH swap hole to new Fie-Pro mud.
03:50 - 04:00 0.17 DRILL P PROD1 PJSM bha handling.
04:00 - 04:50 0.83 DRILL P PROD1 L/D Baker straight motor. P/U BHA #2 (63.18'). Surface test
eXP.
04:50 - 06:45 1.92 DRILL P PROD1 TIH
06:45 - 07:05 0.33 DRILL ~ PROD1 Log tie-in. 0'
07:05 - 07:25 0.33 DRILL P PROD1 TIH. Check weights 47k up 22k down
07:25 - 10:20 2.92 DRILL ~ PROD1 Directionally drill from 9613' to 9756' 2930 CTP free spin, 3325
on bottom. 1-2k web. Ran into what looks like Zone 3.
10:20 - 12:40 2.33 DRILL ~ PROD1 TOH for tri-cone bit.
12:40 - 13:25 0.75 DRILL ~ PROD1 Make up bit #2.
13:25- 15:45 2.33 DRILL 3 PROD1 TIH
15:45 - 16:05 0.33 DRILL ~ PROD1 Log tie-in 0' correction.
16:05 - 16:25 0.33 DRILL P PROD1 TIH through window at 60R no problem.
16:25 - 20:05 3.67 DRILL ~ PROD1 Directionally drill f/ 9756' to 9850'. Motor stalling after taking
survey. 2.1 / 2.1 3140 CTP 4-5k web
20:05 - 22:30 2.42 DRILL 3 PROD1 'TOH
22:30 - 23:00 0.50 DRILL 3 PROD1 Make up bit #3 ( 2nd tri-cone). Surface test eXP.
23:00 - 00:00 1.00 DRILL 3 PROD1 TIH
6/25/2001 00:00 - 00:55 0.92 DRILL 3 PROD1 F n sh TIH. (Tagged at 9080' Baker Mod L SI. SLV. No problem
just a note)
00:55 - 01:20 0.42 DRILL 3 ' PROD1 Log tie-in +1'.
01:20 - 02:00 0.67 DRILL ~ PROD1 Ream and back ream f/9819' to 9850'.
02:00 - 05:25 3.42 DRILL 3 PROD1 Directionally drill f/9850' to 9900'. 3280 CTP 2-4k# web
2.2/2.2
05:25 - 07:40 2.25 DRILL P PROD1 TOH. Planned depth for Change in AKO motor setting.
07:40 - 08:30 0.83 DRILL 3 PROD1 Change motor to 1.5 AKO p/u PDC bit. Surface test eXP.
08:30 - 10:20 1.83, DRILL P PROD1 TIH
10:20 - 10:40 0.33 DRILL P PROD1 Log tie-in 9490' +1' correction.
10:40- 10:55 0.25 DRILL P PROD1 TIH.
10:55 - 14:05 3.17 DRILL P PROD1 Directionally drill f/9900' to 10105'. 3320 CTP 1-3# web
2.2/2.2 no losses.
14:05 - 14:35 0.50 DRILL P PROD1 Wiper trip to window.
14:35 - 17:40 3.08 DRILL P PROD1 Directionally drill f/10105'. 3340 CTP 1-3# web 2.2/2.2 no
losses. Landed out at 10142' md 8984'ss. 3420 CTP 2.0/2.0
110'/hr. Drill to 10300'.
17:40 - 18:25 0.75 DRILL P PROD1 Wiper trip to window.
18:25 - 20:30 2.08 DRILL P PROD1 Directionally drill f/10300' to 10372'. Last sample 20% chert.
Slow digging motor stalls and at times poor weight transfer.
20:30 - 21:15 0.75 DRILL !P PROD1 Wiper trip to window. Ordered new mud.
21:15 - 22:30 1.25 DRILL P PROD1 Directionally drill f/10372' to 10393'. Weight stacking.
22:30 - 22:50 0.33 DRILL I P PROD1 Shortwiper trip.
22:50 - 00:00 1.17 DRILL :P PROD1 Circulate and condition hole we new mud.
6/26/2001 00:00 - 01:20 1.33 DRILL P PROD1 Swap out to new Fie-pro mud. Same time log tie-in 0'
correction.
01:20 - 01:45 0.42 DRILL P PROD1 TIH
01:45 - 03:30 1.75 DRILL P PROD1 Directionally drill f/10393' to 10440'. 3800 CTP 2.2/2.2. Good
weight transfer. Orienter failed at 10425' but for awhile able to
control TF with reactive torque. Erratic drilling and stacking
weight becoming a problem again.
Printed: 7/2/2001 11:29:'14 AM
BP EXPLORATION Page 12 of 12
Operations Summary Report
Legal Well Name: K-10
Common Well Name: K-10A Spud Date: 4/24/2001
Event Name: REENTER+COMPLETE Start: 4/30/2001 End: 5/18/2001
Contractor Name: Rig Release:
Rig Name: Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
6/26/2001 03:30 - 06:00 2.50 DRILL P PROD1 TOH.
06:00 - 07:15 1.25 DRILL ~ P PROD1 P/U new OXP tool and bit #5.
07:15 - 09:05 1.83 DRILL P PROD1 TIH
09:05 - 09:15 0.17 DRILL P PROD1 Log tie-in -2'.
09:15- 10:00 0.75 DRILL P PROD1 RIH. Reamed down last 40' hole.
10:00- 11:00 1.00 DRILL P PROD1 Directionally drill f/10440' to 11525' TD 8982' ss. CTP 3200, IP
5200 psi, AP4500 psi. 90-100'/hr
11:00 - 13:30 2.50 DRILL P PROD1 Circ / cond hole with wiper trips.
13:30- 15:30 2.00 DRILL P PROD1 POH
15:30 - 18:00 2.50 CASE P COMP PU injector head and swap over to ROC
18:00 - 22:00 4.00 CASE P COMP PU liner 2-7/8 X 3-1/2
22:00 - 23:00 1.00 CASE P COMP MU injector. Pull test and pressure test coil connector.
23:00 - 23:59 0.98 CASE ~ COMP Diplace ROC.
6/27/2001 00:00 - 00:30 0.50 CASE ~ COMP Stab injector, break circulation
00:30 - 02:30 2.00 CASE ~ COMP RIH with liner
02:30 - 03:20 0.83 CASE ~ COMP Drop ball and displace to liner hanger.
03:20 - 03:25 0.08 CASE ~ COMP UP wt 49,000# with pump off. Release off liner UP wt.
41,000#.
03:25 - 06:00 2.58 CASE ~ COMP Change well over to KCL
06:00 - 06:20 0.33 CASE ~ COMP PJSM
06:20 - 06:45 0.42 CASE ~ COMP Batch mix 14.2 bbl cement
06:45 - 07:05 0.33 CASE ~ COMP Pump cement
07:05 - 07:49 0.73 CASE ~ COMP Displace cement with 60.1 bbl KCL. Observed PU liner wiper
plug rezero and displace liner with 8.5 bbl plug bumped floats
. held.
07:49 - 10:00 2.18 CASE ~ COMP Un stab from liner
10:00- 13:45 3.75 CASE ~ COMP POH
13:45 - 16:15 2.50 CASE P COMP PU and RIH with memory log GR/CCL/CNL
16:15 - 17:25 1.17 CASE P COMP Log up from PBTD to 100+' above liner'top.
17:25 - 20:00 2.58 CASE P COMP RIH to PBTD and lay in new mud in liner and POH
20:00 - 20:30 0.50 CASE P COMP Standback CS Hydril tubing
20:30 - 21:00 0.50 CASE P COMP PJSM
21:00 - 21:30 0.50 CASE P COMP LD memory logging tools
21:30 - 23:59 2.48 CASE P COMP Wait on cement to finish curing 18 hour minimum prior to
testing per program.
6/28/2001 00:00- 02:00 2.00 CASE !P COMP Continue to wait on cement.
02:00 - 02:30 0.50 CASE P COMP Test liner lap to 2200 psi lost 100 psi in 30 min.
02:30 - 04:30 2.00 CASE P COMP PU perforating guns and hydril tubing.
04:30 - 04:45 0.25 CASE P COMP Make up injector head
04:45 o 07:00 2.25 CASE P COMP RIH with perforatiing assembly
07:00 - 07:12 0.20 CASE P COMP Drop ball and circulate to guns.
07:12 - 07:30 0.30 CASE P COMP Perforate
07:30 - 09:15 1.75 CASE P COMP POH to Hydril.
09:15 - 10:20 1.08 CASE P COMP LD Hydril tubing
10:20 - 12:30 2.17 CASE P COMP Pull and LD perforating guns
12:30 - 13:00 0.50 CASE P COMP RD floor
13:00 - 13:40 0.67 CASE P COMP RIH to 2000'
13:40 - 14:00 0.33 CASE P COMP Freeze protect well
14:00- 14:45 0.75 CASE P COMP POH
14:45 - 18:00 3.25 CASE P COMP RD coil unit Set BPV
18:00 - 19:30 1.50 CASE P COMP ND BOP and release rig
Printed: 7/2/2001 11:29:14 AM
Obp
BP Amoco
Baker Hughes INTEQ Survey Report
INTEQ
Company: BP Amoco
Site: PB K Pad
Welb K-lO
Wellpntb: K-IOA
Date: 7/26/2001 Time: 16:51:47 Page: 1
Ce-ordinate(NE) Reference: Well: K-10, True North
Vertltal (TVD) Reference: 21: 10 1115/198700:0054.3
Section (VS) Reference: Well (0.00N,0.00E,50.00Azi)
Sn~ey Cok=nlation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2001
Site: PB K Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973161.33 ft Latitude: 70 19 57.435 N
670342.10 ff Longitude: 148 37 5.245 W
North Reference: True
Grid Convergence: 1.30 deg
Well: K-10 Slot Name: 10
K-10
Well Position: +NAS 2025.43 ft Northing: 5975196.00 ft Latitude: 70 20 17.355 N
+E/-W 436.04 ff Easting: 670732.00 ff Longitude: 148 36 52.509 W
Position Uncertainty: 0.00 ft
Wellpath: K-10A Drilled From: K-10
500292176201 Tie-on Depth: 9596.00 ft
Current Datum: 21: 10 11/5/1987 00:00 Height 54.30 ft Above System Datum: Mean Sea Level
Magnetic Data: 6/22/2001 Declination: 26.71 deg
Field Strength: 57499 nT Mag Dip Angle: 80.82 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ff ff ff deg
0.00 0.00 0.00 50.00
Survey: MWD Start Date: 6/26/2001
Company: Baker Hughes INTEQ Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Annotation
' ', i~D' =" ,: TVD, , .... ,
ft','I . ,:"ft '" ', ,, :,,
9596.00 8744.27 KOP
10525.00 9036.53 TD
, Survey
MD" incl AZim TVD SSTVD N/S E/W' MapN, , MaPE' DLS ~ VS,
,
,, deg fi.' ' ft' 'i :' ft ' ' , , .degll00ft ft.'
9596.00 25.90 313,88 8744.27 8689.97 1764.19 -2628.80 5976899,76 668063.89 0.00 -879.78
9720.00 41,90 356.00 8848,21 8793.91 1825.46 -2651.65 5976960.49 668039.65 22.29 -857.90
9750.00 44.10 7,90 8870.18 8815.88 1845.83 -2650,92 5976980.87 668039,92 28.00 -844.24
9780.00 45.60 14.90 8891.46 8837.16 1866,54 -2646.72 5977001.67 668043,64 97.19 -827.72
9810.00 47.40 29.40 8912.17 8857.87 1886.57 -2638.52 5977021.88 668051.38 35.52 -808.56
9840.00 48,50 44.00 8932.33 8878,03 1904.32 -2625,26 5977039,93 668064.24 36.28 -786.99
9870.00 52.20 55.40 8951.50 8897.20 1919.17 -2607.66 5977055.17 668081,50 31,72 -763.96
9900.00 59.80 60.50 8968.27 8913.97 1932,31 -2586.58 5977068.79 668102.27 28.98 -739.37
9930.00 63.40 63.00 8982.54 8928.24 1944.79 -2563.33 5977081.79 668125.22 14.06 -713.54
9960.00 64.50 67.30 8995.72 8941.42 1956.11 -2538.88 5977093.66 668149.41 13.39 -687.54
9990.00 67.10 77.30 9008.04 8953.74 1964,39 -2512.85 5977102.54 668175.24 31.60 -662.27
10020.00 71.20 80.90 9018.72 8964.42 1969.68 -2485.33 5977108,45 668202.63 17.68 -637.79
10050.00 75.20 84.50 9027.39 8973,09 1973.31 -2456.86 5977112.73 668231.02 17.60 -613.64
10080.00 80.90 86.60 9033,60 8979.30 1975.58 -2427.61 5977115,67 668260.20 20.20 -589.77
10110.00 86.10 86.40 9037.00 8982.70 1977.40 -2397.87 5977118.16 668289.89 17.35 -565.82
10141.00 90.50 89.10 9037.92 8963.62 1978.62 -2366.92 5977120.08 668320.81 16.65 -541.33
10170.00 89.80 95.80 9037.64 8983.54 1977.38 -2337.96 5977119.51 668349,78 23.23 -519.94
10200.00 89.40 90.10 9038.05 8983.75 1975.84 -2308.01 5977118.64 668379.76 19.05 -498.00
BP Amoco
Baker Hughes INTEQ Survey Report INTEQ
Cempa-y: BP Amoco Date: 7/26/2001 Ti~e: 16:51:47 Pal[e: 2
Field: Prudhoe Bay C.e-e~llaate(NE) l~ference: Well: K-10, True North
Site: PB K Pad Yerttcal (TVD) Refemace: 21: 10 1115/1987 00:00 54.3
Well: K-10 Sectlea (¥$) RefemBee: Well (0.00N,0.00E,50.00Azi)
Wellpatl~: K-10A Smrvey Cal~mlatloa Method: Minimum Curvature Db: Olac_Je
Survey
MD Iaci Azim TVD SSTVD N/S F../W MapN MapE DLS VS
ff deg deg ff fl ff ff ff ff deg/100ff ff
10230.00 88.70 84.80 9038.55 8984.25 1977.17 -2278.06 5977120.66 668409.67 17.82
10266.00 89.60 80.00 9039.08 8984.78 1981.93 -2242.39 5977126.23 668445.22 13.56
10297.00 88.60 76.10 9039.57 8985.27 1988.35 -2212.07 5977133.33 668475.38 12.99
10327.00 89.60 72.80 9040.04 8985.74 1996.39 ~183.17 5977142.03 668504.08 11.49
10357.00 91.70 67.20 9039.70 8985.40 2006.64 -2155.00 5977152.92 668532.02 19.93
10387.00 91.10 61.30 9038.97 8984.67 2019.67 -2128.00 5977166.56 668558.71 19.76
10419.00 92.40 54.00 9037.99 8983.69 2036.77 -2101.00 5977164.27 668585.32 23.16
10450.00 92.20 47.00 9036.74 8982.44 2056.46 -2077.11 5977204.50 668608.75 22.57
10491.00 89.40 40.00 9036.17 8981.87 2086.17 -2048.91 5977234.85 668636.26 18.39
10525.00 89.40 40.00 9036.53 8982.23 2112.22 -2027.06 5977261.38 668657.51 0.00
-474.19
-443.81
-416.46
-389.16
-360.98
-331.92
-300.25
-269.29
-228.59
-195.11
2350
2300
2250
220O
Co-ordinate (N/E) Reference: Well Cenlre: K-10, True North
Vedteal (TVD) Reference: System: Mean Sea Levte 2150
Secbon (VS) Reterence: StO~ 10 (0 O0N,000E)
Measured Dept5 Reference: 21: 10 11/5/1987 00:00 5430
Calculatten Method: Minimum Curvatere 2100
855O
il¸
3000 295O 2900 2850 2800-2750-2700-2650-2600~2550-2500.2450-2400-2350-2300-2250~2200-2150-2100 205O 2000-1950 1900-1850 1800-1750-1~00~1650
-1200-1150 1100 1050 1000-950-900 850-800 750-700-050-600 550-500-450 ~00 350-800 250 200 150 100 -50 0 50 100 150 200 250 300 350 400 450 500 550 000 600 700
Vertical $ectJo~ at 50.00°
g/2EV200~ 4:54 ~M
~ bp
V
BP Amoco
Baker Hu~hes INTEQ Survey Report
Company: BP Amoco
Site: PB K
Well: K-10
Weliputh: K-10APB1
Date: 6/22/2001 Time: 13:41~27 Page: 1
Co=ordinate(NK) Reference: Well: K-10, True North
Vertical O'VD) Re~eren¢~: 21: 10 1115/1987 00:00 54.3
Section (VS) Reference: Well (0.00N,0.00E,306.02Azi)
Snrvey Calenlnflon Metkod: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2001
Site: PB K Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973161.33 ft Latitude: 70 19 57.435 N
670342.10 ff Lougitude: 148 37 5.245 W
North Reference: True
Grid Convergence: 1.30 deg
Well: K-10 Slot Name: 10
K-10
Well Position: +N/-S 2025.43 ft Northing: 5975196.00 ft Latitude: 70 20 17.355 N
+E/-W 436.04 ft Easting: 670732.00 ff Longitude: 148 36 52.509 W
Position Uncertainty: 0.00 ft
Wellpath: K-10APB1 Drilled From: K-10
500292176270 Tie-on Depth: 9596.00 ft
Current Datum: 21: 10 11/5/1987 00:00 Height 54.30 ft Above System Datum: Mean Sea Level
Magnetic Data: 5/8/2001 Declination: 26.74 deg
Field Strength: 57485 nT Mag Dip Angle: 80.81 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ff ff ff deg
0.00 0,00 0.00 306.02
Survey: MWD Start Date: 5/7/2001
Company: Baker Hughes INTEQ Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Annotation
MD: ], TVD
ft"" ' ff'
9596.00 8744.27 KOP
9975.00 9054.55 Projected to TD
Survey
,
MD Incl Azim TVD SSTVD N/S E/W MaPN ' MapE DLS VS
'deg: deg. fi. ' ff fl ff ff 'ff = deg/100ff ft
9596.00 25.90 313.88 8744.27 8689.97 1764.19 -2628.80 5976899.76 668063.89 0.00
9639.00 27.90 348.40 8782.84 8728.54 1780.65 -2637.64 5976916.02 668054.67 36.16
9676.00 28.20 6,40 8815.56 8761.26 1797.85 -2638.41 5976933.19 668053,52 22.82
9714.00 25.80 23.60 8649.47 8795.17 1814,38 -2634.09 5976949.82 668057.46 21.42
9744,00 20.70 33.10 8877.03 8822.73 1824.81 -2628.58 5976960.37 668062.73 21.05
9786.00 25.20 70.00 8915.89 8861.59 1834.14 -2616.05 5976969.98 668075.04 35.27
9823.00 30.40 93.90 8948.71 8894.41 1836.21 -2599.25 5976972.43 668091,79 32.98
9855.00 44.50 113.20 8974,14 8919,54 1831.20 -2580.71 5976967.84 668110.44 56.89
9893.00 45.10 105.10 9001.12 8946.82 1822.44 -2555.4 5 5976959.66 668135.89 15.10
9939.00 51.00 96.00 9031.90 8977.60 1816.31 -2521.88 5976954.30 668169.59 19.50
3163.66
3180.50
3191.24
3197.46
3199.14
3194.49
3182.12
3164.17
3138.59
3107.84
9975.00 51.00 96.00 9054.55 9000.25 1813.39 -2494.05 5976952.01 668197.47 0.00 3083.61
Obp
BP Amoco
Baker Hughes INTEQ Survey Report
1NTEQ
Cm~lm~y: BP Amoco
Site= PB K Pad
Wel~ K-10
Welling: K-10APB2
Date: 6~22/2001 Time: 13:43:08 Page: 1
Co-ordlaate(Ng) Reference: Well: K-10, True North
Vertical (TVD) Reference: 21: 10 1115/1987 00:00 54.3
Scetlon (VS) Reference: Well (0.00N,0.00E,304.75AzJ)
Snm'ey CakMatlon Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Gee Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2001
Site: PB K Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973161.33 ft Latitude: 70 19 57.435 N
670342.10 ff Longitude: 148 37 5.245 W
North Reference: True
Grid Convergence: 1.30 deg
Well: K-10 Slot Name: 10
K-10
Well Positlon: +N/-S 2025.43 ft Northing: 5975196.00 ft Latitude: 70 20 17.355 N
+FJ-W 436.04 ff Easting: 670732.00 ff Longitude: 148 36 52.509 W
Position Uncertainty: 0.00 ft
Wellpnth: K-10APB2 Drilled From: K-10APB1
500292176271 Tie-on Depth: 9786.00 ft
Current Datum: 21: 10 11/5/1987 00:00 Height 54.30 ft Above System Datum: Mean Sea Level
Magnetic Data: 5/10/2001 Declination: 26.73 deg
Field Strength: 57485 nT Mag DIp Angle: 80.81 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ff ff ff deg
0.00 0.00 0.00 304.75
Survey: MW D Start Date: 5/10/2001
Company: Baker Hughes INTEQ Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Annotation
MD , TVD
9786.00 8915.89 KO P
10050.00 9103.37 Projected to TD
Survey
MD' : ~ Incl: ' '" Azlm ,SSTVD N/S,' E/W' ' : , MIpN ' 'MapE . D,LS VS
fi, , :,deg,; deg ,' , ' ',ff, fi:: ~ fi':: ' ' fi,, fi:,: iideg!100ff' :, ,
9786.00 25.20 70.00 8915.89 8861.59 1834.14 -2616.05 5976969.98 668075.04 0.00 3194.93
9816.00 30.20 98.50 8942.56 8888.26 1835.22 -2602.52 5976971.36 668088.54 46.71 3184.42
9846.00 40.40 109.40 8967.04 8912.74 1830.86 -2585.83 5976967.39 668105.33 39.85 3168.22
9878.00 48.50 122.00 8989.91 8935.61 1821.03 -2565.81 5976958.01 668125.56 37.34 3146.17
9928.00 53.00 139.30 9021.68 8967.38 1795.84 -2536.77 5976933.50 668155.17 28.21 3107.95
9957.00 43.80 142.10 9040.91 8986.61 1779.10 -2523.02 5976917.08 668169.30 32.53 3087.12
9989,00 46,10 136.10 9063.57 9009.27 1762.05 -2508.21 5976900.37 668184.49 15.07 3065.23
10019.00 50,40 151,20 9083.81 9029.31 1744.07 -2495,10 5976882.69 668198.00 40.12 3044.21
10050.00 50.40 151.20 9103.37 9049.07 1723.13 -2483.60 5976862.03 668209.98 0.00 3022.82
Obp
BP Amoco
Baker Hughes INTEQ Survey Report
Company: BP Amoco
Field: Prudhoe Bay
Sit~. PB K Pad
Well: K-10
Welipat~: K-10APB3
B~te: 6/22/2001 TIm~: 13:49:38 Page: I
Ce~rdlaate(NE) Reference: Well: K-10, True North
Yertleal (TVD) Referel~e: 21: 10 1115/1987 00:00 54.3
S~IOI (V'S) R~f~l'~l{-* Well (0.00N,0.0OE,50.00Azi)
Survey Colenlatlen Metkod: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Gee Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2001
Site: PB K Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973161.33 ft Latitude: 70 19 57.435 N
670342.10 ft Longitude: 148 37 5.245 W
North Reference: True
Grid Convergence: 1.30 deg
Well: K-10 Slot Name: 10
K-10
Well Position: +N/-S 2025.43 ft Northing: 5975196.00 ft Latitude: 70 20 17.355 N
+E/-W 436.04 ft Eastiug: 670732.00 ff Longitude: 148 36 52.509 W
Position Uncertainty: 0.00 ff
Wellpath: K-10APB3 Drilled From: K-10APB2
500292176272 Tie-on Depth: 9816.00 ft
Current Datum: 21: 10 11/5/1987 00:00 Height 54.30 ft Above System Datum: Mean Sea Level
Magnetic Data: 6/18/2001 Declination: 26.71 deg
Field Strength: 57499 uT Mag Dip Angle: 80.82 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ff ff ff deg
0.00 0.00 0.00 50.00
Survey: MWD Start Date: 5/11/2001
Company: Baker Hughes INTEQ Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Annotation
MD,: TVD ' '
, ,
,
9816.00 8942.56 KO P
9893.00 9003.12 Projected to TD
Survey
'MD ' Incl Azlm ' SSTVD N/S ' E/W' MapN MaPE DLS," VS
ft '..'. deg' ' fi' it ft' fi' degll00ft ft
, ,
9816.00 30.20 98.50 8942.56 8888.26 1835.22 -2602.52 5976971.36 668088.54 0.00 -813.99
9847.00 37.60 67.50 8968.47 8914.17 1837.71 -2585.93 5976974.23 668105.08 59.96 -799.68
9862.00 41.80 60.10 8980.01 8925.71 1841.95 -2577.36 5976978.67 668113.55 42.12 -790.39
'9893.00 41.80 60.10 9003.12 8948.82 1852.25 -2559.44 5976989.38 668131.22 0.00 -770.04
REFERENCE iNFORMATiON 1920
Vertical (TVD) Reference: System Mean Sea Level 1900
Co-ordi~ale (N/E) Reference: We~l Centre: K-10 True No,lb
Section (VS) Referefme: Slot - 10 (0 0ON,0 O0E)
Measured Depth Reference: 21: 10 11/5/1987 00:00 54 30
Calculation Method: Minimum Cu~ature 1880
8780
8800
8820
282072800-2780-276O-2740-2720 ~2700-2680 2660 264O-2620-2~00-2580-2560-2540-2520 -2500 2480 2460-2zM0-2420-2400-2380-2360 2340 2820 2300
908 ~80 86O 840 -820 -800 780 -760 74O 72O 70O -680 -660 -640 -620 -600 580 560 7540 -520 -5O0 480 -460 440 ~20 ~00 880 360 -840 -820 -300 -280 -260 -240 -220 2OO -180 -160 -140
6/22/200~ ~:54 PM
08/16/01
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrle
NO. 1379
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite t00
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Sepia Prints CD
K-10A ~'~ ~ PRODUCTION PROFILE 08105/01
D.S. 2-21A c:~Ol~Oc~ , PRODUCTION PROFILE 08103101
D.S. 12-21 /~f'~---~/~ LEAK DETECTION LOG 08107101
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
RECEIVED
AUG 2-1 2001
Alaska Oil & Gas Cons. Commission
And~u~age
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5~1
08~01/01
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
NO. 1345
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Sepia Prints CD
D.S. 18-28 j ~ c~ - =Tz/ PSP-LDL 07122/01 I 1
B-30A 2_0 ~-- ) ~),~ 21329 MCNL 06/25/01 1 t 1
E-35A 2,0t-Il? 21333 MCNL 0?/03/04 I I 1
K-10A -Z[31-- (~ 21331 MCNL 06127101 1 I 1
D.S. 18-32A Zcr~-IG7 21328 MCNL 06121101 1
Y-ISA ?-O J '-O~ 21334 MCNL 07/05/01 1 I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A-I-tN: Sherrie
RECEIVED
AUG 0 3 ; 00!
Received by:
0il & Gas Cons. Commission
Anchorage
06/14/2001..13:23 FAX 907 564 5510
BP ALASKA DRILLING i WELLS
bp
[~001
COMPANY:
DATE:
FAX:
FROM;
FAX:
PHONE:
MESSAGE:I i ,
JUN 1 4 2001
Alasl~ Oil & klas ~.;o,'~= '.,~,,',, ..... ~'~"'"
Anchorage
J Number of attachments not including fax cover: "~ J
06/14/2001 13:23 FAX 907 564 5510 bp
TREE = 6" CIW
WELLHEAD= MCEVOY
ACTUATOR=- AXELSON
~ FIEV = 26.38'
<OP = 3000'
Max Angle = 36 @ 6000'
Datum ~E) = 9718
Datum Tv'D= 8800'S,S
K-lOa
Status - 17th May 2001
~002
196T 4 1/2' CAM SSSV LANDING NIP. ID=-3.813 I
13-3Ia"CSG,72#,S95,BTRS ]~' 2694'
9-5/8" 47# L-80,NSCC ]--'~ 4635'
GAS LIFT MANDRELS
......
TYPE MAN J LATCH J
OTIS .
OTIS
OTIS
IMinimum D = 3.725 ~ 9236'
4 1/2" OTIS XN NIPPLE
[ TOP OF 7" LNR J"-{ 9197" J _
! Baker Liner Sleeve Iff 9~96' , J
I 4-1/2"'mG, 12.8#,L-80 l-"J~ 9271'
/J
9-518" CSG, 47#, L-80,BTRS J---J 9479'
[ 9596' J~ 'rop or Whip, tockI
oo 2'
7" TBG, 26#, L-80,BTRS l'-~ 10134'
9067' 4 1/2" BKR (MOD, L) SL,SLV., ID=3.813J
9135' 4 1t2" TUBING SEAL ASSY J
9151' Jd 9 5/8" TIW PACKER, IC:~-4,750 I
9'197' Iff 4 1/2" OTIS X NIPPt. E ID=- 3.813 J
9236' Jd 41/2,, OTIS XN NIPPLE, ID:3.725 J
9271 4 1/2" TIW TUBING TAIL, ID=-3.958 ].
_
' ~"'-'"'"--~i Calculated TOO J
,,
Sidetrack's P&A with cement back to window
~ 3rd Hole, 9B18' - 9893'
1st Hole, 9860' - 9974'
Motor fish @ 9974'
'--'--'{ 10090' Jfl 2nd Hole 9798' - 9885'
IBP PUSHED TO Bo'FrOM 3/6/9;~- I
RECEI¥[D
JUN 14
bp
To:
Tom Maunder
Sr. Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Ted Stagg
CTD Engineer
Date: June 13, 2001
Re: Well K-10a
Well K-10a was issued a Permit to Drill, 201-058, and operations began on May 1, 2001. Due to an
unrecoverable fish, the remaining sidetrack was cemented back to the window and an Operation Shutdown
status was approved, 301-134, on May 23, 2001.
The K-10a sidetrack has now been re-planned and approval for resumption of drilling operations is requested.
The target BHL has not changed but a new directional plan for reaching that BHL has been developed and is
attached. The original window in the 7" liner at 9600 ft will be used again.
The completion design and all other aspects of the sidetrack plan remain as outlined in the original Permit to Drill
application. The coil drilling rig will be SLB/Nordic 1. A BOP diagram is attached. Operations are expected to
resume on June 27, 2001.
Ted Stagg
CTD Drilling Engineer
CC: Well File
Petrotechnical Data Center
ALASv(,r,,- ~ i-'ATE OF ALASKA ,~,"
JIL AND GAS CONSERVATION CO,v,,...SSlON
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request:
[] Abandon
[] Alter Casing
[] Change Approved Program
[] Suspend
[] Repair Well
[] Operation Shutdown
[] Plugging [] Time Extension
[] Pull Tubing [] Variance
[] Re-Enter Suspended Well [] Stimulate
[] Perforate
I~ Other
Re-Enter Cps Shutdown
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
Location of well at surface
2007' SNL, 462' EWL, SEC. 04, T11N, R14E, UM
At top of productive interval
226' SNL, 2180' WEL, SEC. 05, T11N, R14E, UM
At effective depth
At total depth
70' NSL, 1549' WEL, SEC. 32, T12N, R14E, UM
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KB)
KBE = 54.3O'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
K-10A
9. Permit Number
201-058 / 301-134
10. APl Number
50- 029-21762-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
Present well condition summary
Total depth: measured 9893 feet
true vertical 8947 feet
Effective depth: measured 9600 feet
true vertical 8748 feet
Casing
Plugs (measured)
Junk (measured)
Set Whipstock at 9596' (03/01), cemented old Perfs.
PB3 cemented back to Window at 9600' (05/01)
Length Size Cemented MD TVD
Structural
Conductor 110' 20" 8 cu yds concrete 110' 110'
Surface 2666' 13-3/8" 1860 cu ft Arcticset III, 1860 cu ft AS II 2694' 2694'
Intermediate 9451' 9-5/8" 1973 cu ft Class 'G' 9479' 8639'
Production
Liner 937' 7" 345 cu ft Class 'G' 9197' - 9600' 8384' - 8748'
Perforation depth: measured None
true vertical None
Tubing (size, grade, and measured depth)
RECEIVED
JUN 1 3 200!
4-1/2", 12.6#, L-80 to 9151' with 4-1/2" tailpipe to 92'~1a~ka Oil & Gas Cons. Commission
Anchorage
Packers and SSSV (type and measured depth) 9-5/8" TIW PBR packer at 9151'; 4-1/2" SSSV Landing Nipple at 1967'
13. Attachments
[] Description Summary of Proposal
14. Estimated date for commencing operation
June 27, 2001
16. If proposal was verbally approved
Name of approver
Date Approved
Contact Engineer Name/Number: Ted Stagy, 564-4694
[] Detailed Operations Program [] BOP Sketch
I15. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby ¥ that the fore( ' is true and correct to the best of my knowledge
Signed Ted Title CT Drilling Engineer Date ..~
Conditions of Approval: Notify Commission so representative may witness "~$(::3(~) '~-.~, '~1~ .~ Approval No. ~.~.){ -( S '7
Plug integrity BOP Test ~ Location c~earance
Mechanical Integrity Test __ Subsequent form required 10- ~)"-~ ~7,_ ~, c._o ~w,,{;)\~'~ c~",~.
Approved by order of the Commission ID T~IYlQr Sear0.0unt
Form 10-403 Rev. 06/15/88 U R I G I [~{/.~L Submit Ir/'Tri~ica~e
W~.LI-EAD= MCEVOY
ACTUATOR= AXELSON
BF. I=IEV = 26.38'
KOP= 3000'
Max Angle = 36 @ 6000'
Datum MD = 9718
Datum 'IV D= 8800'SS
~._ V' ~.
MAR ! 4 2~~
.Alaska Oii& Gas Cc,'~,s. Ccmm~ssio',~
Ancho[a§e
I 13-3/8'CSG,72#,sg5,BTRS,.1481bpf,ID=12.347 ~--~ 2694'
I 9-5/8' 47# L-80,NSCC H 4635'
K-10a
"' I SAFETY NOTES
1967' H 4 1/2' CAM SSSV LANOING NP. 13=3.813
GAS LIT MANDRELS
I ~ I ~°~S'l ~e~S'l ~1 o~s I ~ I
I I I 89971815°'1 241 OTiS I P,A I
IMinimum ID = 3.725 @ 9236'
4 1/2" OTIS XN NIPPLE
9067' J---J 4 1/2" BKR (MOD. L) SL.SLV., ID=3.813J
9135' J--J 4 1/2' TUBING SEAL ASSY J
9151' J---J 9 518' TIW PACKER, 13=4.750 J
J TOPOF 7" LNR H 9197'
J 4-1/2' 'rBG, 12.6#, L-S0, 0.0152 bpf, ID=3.958 H 9271'
9-5/8" CSG, 47#, L-80,BTRS 0.0732 bpf, [:)=8.681 H 9479'
I 9492' J-J MARKERJOIq'I"I
9197' J--J 4 1/2" OTIS X NI=PLF_, ID= 3.813 J
9236' J---J 4 1/2' OTIS XN NI=PI.E, D=3.725 J
9271'
4 112" TIVV TUBING TAL, [3=3.958 J
Jdesired cement top J
3-3116" LINER J
J 9575' ~ Top of Whipstock J
PERFORA~ SUMMARY
REFLOG: BHCS 11-16-87
ANGLE AT TOP PERF: 128 @ 9575, I
Note: Refer to Production DB for historical perf data
SIZE SPF INI'EI~AL Opn/Sqz DATE
3 3/8 4 9575' - 9613' C 2/26/1992
3 3/8 4 9596°- 9598' C 1/28/1994
3 3/8 4 9864'- 9869' C 1/28/1994
3 3/8 4 9912' - 9958' C 1/2811994
3 3/8 4 9949' - 9958' O 2/26/1992
J2-718", 6.4#, ST-L, L-80J
J,,..10,500'm d J
J mTDH
7" 'rBG, 26~, L-80,BTRS, 0.0383 bpf, D=6.276 H
10092'
10134'
10090'
H IBP
PUSI-II~) TO BO'I-rOM 3/6/92 J
DATE REV BY
03/09/98 INITIAL COIVlPL~
01/05/00 SIS-QAA CONVB:L'TE) TO CANVAS
01111/01 SIS-LG REVISION
01117/01 SIS-MD FINAL
03/12/01 AS CTD Sidetrack
PRLDt-~E BAY UNrI'
WELL: K-10
PERMIT No: 87-114
ARNo: 50-029-21762-00
Sec. 4, T11N, R14E
BP Exploration (Alas ka)
BP Amoco
REFERENCE INFORMATION
Co-ordinate (N/~) Reference: Well Centre: K-10, Ti~e North
Vertical (TVD) Reference: System: Mean Sea Level
Se~on (VS) Reference: Slol- 10 (0.00N,0.00E)
Measured Depth Reference: 21:10 1115/1987 00:00 54.30
Calculation Method: Minimum Curvature
SEGTION DETAILS
26.00 313.408603.65 1735.19 -259B.3g o.oo o.oo
25.90 313.~0ee~se17es.40 -2630.06 0.24 114.79
9~15.00 2'1..18 314~17 870~97 1T70.0~ -26~4.~8 10.00 1o.oo
,ess. oo .'M. s4 a3e.?o &741.14 l?,e. es .2e47.s2 2,.oo 7moo
~2s. oo e~.~4 6~.11 eg.~.?o lSSe.19 -ZS~l.e? 2~.oo 1to.oo
em~9.ss l~?s. e7 -22M. ge lO.Oo ~s.oo
1050o.o0 ~a.9, s4.e6 eB?,.~4 2o7~.24 -zole.~e lO.Oo
ANNOTATIONS
TVD MD A~ t~t~
liD3,6S BIO0*00 ~P
8i93~8 lS~,00 ~OP
8706~7 g615.~
87~8 1U35.00 ~
8741.14 OSSS.O0
Igll~5 1011LM
8~7B~ t05~,00 ~
TA.~G~T D~TA~L~
8450' ~
8500
8550
8600
8650
8750
~88~o
Obp
LEGEND
K-10 (K-10)
K-10 (K-10APB1)
K~10 (K-10APB2)
Plan#7 K-10A
Plan ~
2350 :
. /
- /
2300 ~ / '
.
2250 .... /
/
2200 ' - · ' / .
: // '
2150 "':: ; ' '
· /
2100';
m02o5o: /×'
2000 . i
/
1950 !
,~1850 '
18oo !
1750'!
1700 -
1650 - .K4OA~
1600 -
T
Azimuths to True North
Magnetic Nodh: 26.72°
Magnetic Field
Strength: 57498nT
Dip Angle: 80.82'
Date: 6/7/2001
Model: BGGM2001
Plan: Plan #7 (K-10/Plan#7 K-10A)
Created By: Brij PothisDale: 6/8/2001
C ( ;r.,[a c.~ tnform:~tion
L'~6CL (t:107) 267-6613
E.rn:*ii: bnj ~o!nhq~CJr:leq.ccm
F~3ker Hughes. tI',ITF..Q {g07)
1550
::. -: :~.:- -.:..- . . .-..: :, . .-- : : .
-3000-2950-2900-2850-2800-2750-2700-2650-2600-2550-2500-2450-2400-2350-2300-2250-2200-2150-2100-2050-2000-1950-1900-1850-1800-1750-1700
West(-)/East(+) [SOft/in]
. . .
: ~"i , ' ........... ~J. . .......... ~ .
9000 '! i ' X_ ,~ ~
i : -L Plan~7 ~
9050..' .. i · ~ .....
.: . ! i K-10 (K-10APB2)i .
;
::-,.~--:. -.;-,._.-: .::-., ........ .;.:.:?:. : -~ .... :. :: .-~:--::'? .... ;-~--:':,~':i":? '--; -- '- ~"?
-1050-1000-950-900-850-800-750-700-650 -600-550-500 450-400-350-300-250-200-150-100-50 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850
Vertical Section at 50.00' [50fidin]
6/8/2001 10:20 AM
ObP
BP Amoco
Baker Hughes INTEQ Planning Report
INTEQ
Company: BP Amoco
Field: Prudhoe Bay
Site: PB K Pad
Well: K-10
Wellpath: Plan#7 K-10A
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Date: 6/8/2001 Time: 10:25:00 Page: 1
Co-ordinate(NE) Reference: Well: K-10, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,50.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2001
Site: PB K Pad
TR-11-14
UNITED STATES · North Slope
Site Position: Northing: 5973161.33 ft
From: Map Easting: 670342.10 ft
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
Well: K- 10
K-10
Well Position: +N/-S 2025.43 ft Northing: 5975196.00 ft
+E/-W 436.04 ft Easting: 670732.00 ft
Position Uncertainty: 0.00 ft
Latitude: 70 19 57.435 N
Longitude: 148 37 5.245 W
North Reference: True
Grid Convergence: 1.30 deg
Slot Name: 10
Latitude: 70 20 17.355 N
Longitude: 148 36 52.509 W
Wellpath: Plan#7 K-10A Drilled From: K-10
500292176201 Tie-on Depth: 9600.00 ft
Current Datum: 21: 10 11/5/1987 00:00 Height 54.30 ft Above System Datum: Mean Sea Level
Magnetic Data: 6/7/2001 Declination: 26.72 deg
Field Strength: 57498 nT Mag Dip Angle: 80.82 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 50.00
Plan: Plan #7 Date Composed: 6/7/2001
Post K-10APB2 - Lamar's Plan #11 Version: 1
Principal: Yes Tied-to: From: Definitive Path
Targets
· Map ' Map:
· . Name Description .TVD · ." +N/-s +E/.W · 'Northing. Easting.
.... . . ... .' ft · 'ft. .ft : ft ft
· ..
· <-~-. Latitude ---> · < .... ·Longitude --->
Deg Min' Sec Deg..Min Sec
..
K-10A Polygon103.1 0.00 1810.04 -2441.69 5976949.85 668249.90 70 20 35.153 N 148 38 3.842 W
-Polygon 1 0.00 1810.04 -2441.69 5976949.85 668249.90 70 20 35.153 N 148 38 3.842 W
-Polygon 2 0.00 2204.29 -2182.65 5977349.87 668499.88 70 20 39.031 N 148 37 56.277 W
-Polygon 3 0.00 2098.63 -1934.97 5977249.89 668749.88 70 20 37.992 N 148 37 49.040 W
-Polygon 4 0.00 1755.51 -2242.86 5976899.87 668449.90 70 20 34.617 N 148 37 58.033 W
K-10A Fault1 0.00 1598.21 -2936.66 5976726.83 667759.91 70 20 33.068 N 148 38 18.300 W
-Polygon 1 0.00 1598.21 -2936.66 5976726.83 667759.91 70 20 33.068 N 148 38 18.300 W
-Polygon 2 0.00 1528.05 -1917.92 5976679.88 668779.91 70 20 32.381 N 148 37 48.538 W
K-10A Fault2 0.00 1863.43 -3030.67 5976989.82 667659.89 70 20 35.676 N 148 38 21.049 W
-Polygon 1 0.00 1863.43 -3030.67 5976989.82 667659.89 70 20 35.676 N 148 38 21.049 W
-Polygon 2 0.00 2552.85 -2554.86 5977689.85 668119.85 70 20 42.458 N 148 38 7.155 W
Annotation
9500.00 8603.65 TIP
9600.00 8693.56 KOP
9615.00 8706.97 1
9635.00 8724.36 2
9655.00 8741.14 3
9925.00 8934.70 4
10199.64 8989.55 5
10500.00 8978.84 TD
ObP BP Amoco
Baker Hughes INTEQ Planning Report t~'~,[-.-~ ..............
Company: BP Amoco Date: 6/8/2001 Time: 10:25:00 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: K-10, True North
Site: PB K Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: K-10 Section (VS) Reference: Well (0.00N,0.00E,50.00Azi)
Wellpath: Plan#7 K-10A Survey Calculation Method: Minimum Curvature Db: Oracle
Plan Section Information
MD Incl Azim TVD +NbS +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft degll00ft deg
9500.00 26.00 313.40 8603.65 1735.19 -2598.39 0.00 0.00 0.00 0.00
9600.00 25.90 313.90 8693.56 1765,40 -2630.06 0.24 -0.10 0.50 114.79
9615.00 27.38 314.47 8706.97 1770.08 -2634.88 10.00 9.86 3.78 10.00
9635.00 31.86 321.29 8724.36 1777.43 -2641.47 28.00 22.39 34.13 40.00
9655.00 34.14 330.70 8741.14 1786.45 -2647.52 28.00 11.40 47.02 70.00
9925.00 66.94 69.11 8934.70 1916.19 -2554.67 28.00 12.15 36,45 110.00
10199.64 90.00 84.45 8989.55 1975.67 -2294.96 10.00 8.40 5.59 35.00
10500.00 93.99 54.66 8978.84 2079.24 -2016.88 10.00 1.33 -9.92 278.00
Survey
ft deg deg ff: ft ff ff ff deg/100ff ff ; deg
9500.00 26.00 313.40 8603.65 1735.19 -2598.39 5976871.47 668094.95 0.00 -875.12 0.00 TI P
9525.00 25.97 313.52 8626.12 1742.73 -2606.34 5976878.82 668086.83 0.24 -876.37 114.79 MWD
9550.00 25.95 313.65 8648.60 1750.27 -2614.27 5976886.18 668078.73 0.24 -877.59 114.68 MWD
9575.00 25.92 313.77 8671.08 1757.83 -2622.17 5976893.55 668070.66 0.24 -878.79 114.56 MWD
9600.00 25.90 313.90 8693.56 1765.40 -2630.06 5976900.94 668062.60 0.24 -879.97 114.45 KOP
9615.00 27.38 314.47 8706.97 1770.08 -2634.88 5976905.51 668057.68 10.01 -880.65 10.05 1
9625.00 29.58 318.12 8715.76 1773.53 -2638.17 5976908.89 668054.31 28.00 -880.95 39.98 MWD
9635.00 31.86 321.29 8724.36 1777.43 -2641.47 5976912.71 668050.92 28.00 -880.97 36.75 2
9650.00 33.51 328.46 8736.99 1784,05 -2646,11 5976919.22 668046.13 28.01 -880.28 70.01 MWD
9655.00 34.14 330.70 8741.14 1786.45 -2647.52 5976921.59 668044.67 28.02 -879.81 63.99 3
9675.00 32.60 340.50 8757.85 1796.43 -2652.07 5976931.46 668039.90 28.00 -876.88 110.00 MWD
9700.00 31.83 353.57 8779.03 1809.35 -2655.06 5976944.31 668036.61 28.00 -870.87 101.81 MWD
9725.00 32.42 6.71 8800.23 1822.57 -2655.01 5976957.53 668036.36 28.00 -862.33 90.74 MWD
9750.00 34.31 18.99 8821.13 1835.91 -2651.93 5976970.93 668039.13 28.00 -851.40 79.60 MWD
9775.00 37.29 29.83 8841.43 1849.15 -2645.87 5976984.31 668044.89 28.00 -838.24 69.33 MWD
9800.00 41.12 39.12 8860.81 1862.12 -2636.90 5976997.47 668053.56 28.00 -823.04 60.52 MWD
9825.00 45.59 46,98 8879.00 1874.60 -2625.17 5977010.22 668065.00 28.00 -806.03 53.31 MWD
9850.00 50.51 53,68 8895.72 1886.42 -2610.86 5977022.36 668079.05 28.00 -787.46 47.59 MWD
9875.00 55.77 59,46 8910.72 1897.40 -2594.16 5977033.72 668095.49 28.00 -767.62 43,10 MWD
9900.00 61.27 64.54 8923.77 1907.38 -2575.34 5977044.12 668114.07 28.00 -746.79 39.63 MWD
9925.00 66.94 69.11 8934.70 1916.19 -2554.67 5977053.40 668134.54 28.00 -725.29 36.94 4
9950.00 69.00 70.65 8944.08 1924.16 -2532.91 5977061.86 668156.11 10.00 -703.50 35.00 MWD
9975.00 71.06 72.14 8952.62 1931.65 -2510.64 5977069.86 668178.19 10.00 -681.62 34.42 MWD
10000.00 73.14 73,60 8960.30 1938.66 -2487.91 5977077.38 668200.76 10.00 -659.70 33.91 MWD
10025.00 75.23 75,02 8967.11 1945.16 -2464.75 5977084.41 668223.76 10.00 -637.78 33.47 MWD
10050.00 77.33 76.42 8973.04 1951.15 -2441.22 5977090.93 668247.15 10.00 -615.91 33.08 MWD
10075.00 79.44 77.80 8978.07 1956.61 -2417.35 5977096.94 668270.89 10.00 -594.11 32.75 MWD
10100.00 81.55 79.15 8982.20 1961.54 -2393.19 5977102.41 668294,93 10.00 -572.44 32.47 MWD
10125.00 83,67 80.49 8985.41 1965.92 -2368.79 5977107.35 668319.22 10.00 -550.93 32.24 MWD
10150.00 85.79 81.82 8987.71 1969.74 -2344.20 5977111.73 668343.72 10.00 -529.63 32.07 MWD
10175.00 87.91 83,15 8989.09 1973.01 -2319.45 5977115.56 668368.39 10.00 -508.58 31.98 MWD
10199.64 90.00 84.45 8989.55 1975.67 -2294.96 5977118.77 668392.81 10.00 -488.11 31.90 5
10200.00 90.00 84.45 8989.55 1975.70 -2294.60 5977118.82 668393.16 0.00 -487.81 0.00 MWD
10225.00 90.35 81.94 8989.47 1978.67 -2269.78 5977122.35 668417.91 10.14 -466.89 278.00 MWD
10250.00 90.70 79.46 8989.24 1982.71 -2245.11 5977126.95 668442.48 10.00 -445.39 277.99 MWD
10275.00 91.05 76.99 8988.86 1987.82 -2220.64 5977132.61 668466.82 10.00 -423.37 277.97 MWD
10300.00 91.39 74.51 8988.33 1993.97 -2196.42 5977139.31 668490.90 10.00 -400.86 277.93 MWD
10325.00 91.73 72.03 8987.65 2001.16 -2172.49 5977147.05 668514.66 10.00 -377.90 277.88 MWD
10350.00 92.07 69.55 8986.82 2009.38 -2148.90 5977155.80 668538.06 10.00 -354.54 277.81 MWD
10375.00 92.40 67.07 8985.84 2018.61 -2125.68 5977165.56 668561.05 10.00 -330.83 277.73 MWD
10400.00 92.73 64.59 8984.72 2028.83 -2102.90 5977176.29 668583.59 10.00 -306.81 277.63 MWD
10425.00 93.06 62.11 8983.46 2040.03 -2080.59 5977188.00 668605.65 10.00 -282.51 277.52 MWD
BP Amoco
Baker Hughes INTEQ Planning Report i~q'-r-ii;T~ ..................
Company: BP Amoco Date: 6/8/2001 Time: 10:25:00 Page: 3
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: K-lO, True North
Site: PB K Pad Vertical (TVD) Reference: System: Mean Sea Level
Well: K-10 Section (VS) Reference: Well (0.00N,0.00E,50.00Azi)
Wellpath: Plan#7 K-10A Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ff deg deg ff ff ff ff ff deg/100ft ff deg
10450.00 93.38 59.63 8982.06 2052.18 -2058.78 5977200.64 668627.16 10.00 -258.00 277.40 MWD
10475.00 93.69 57.14 8980.52 2065.26 -2037.54 5977214.20 668648.11 9.99 -233.32 277.21 MWD
10500.00 93.99 54.66 8978.84 2079.24 -2016.88 5977228.64 668668.44 9.99 -208.51 277.06 TD
23/8" CT ~
Lubricator~
Nordic 1
K-10a
CT Drilling & Completion BOP
71/16"
Annular
7 1/16" 5000 psi
I 71/16" I ,
_ I~ IPipe/slips I ~11~ 23/8'
] r
7 1/16" x 5,000 psi
I
Pipe/Slips
7 1/16"
Pipe
I
27/8"
VBR
3/8" to 3.5"
SWAB OR MASTER VALVE
1. Type of Request:
[] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
;2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2007' SNL, 462' E~L, SEC. 04, T11N, R14E, UM
At top of productive interval
226' SNL, 2180' WEL, SEC. 05, T11N, R14E, UM
At effective depth
242' SNL, 2163' WEL, SEC. 05, TllN, R14E, UM
At total depth
158' NSL, 1640' WEL, SEC. 32, T12N, R14E, UM (As Planned)
6. Datum Elevation (DF or KB)
KBE = 54.30'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
K-10A
9. Permit Number
201-058
10. APl Number
50- 029-21762-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
12.
Present well condition summary
Total depth: measured 9893 feet
true vertical 8947 feet
Effective depth: measured 9600 feet
true vertical 8748 feet
Casing Length Size
Structural
Conductor 110' 20"
Su trace 2666' 13-3/8"
Intermediate 9451' 9-5/8"
Production
Liner 937' 7"
Plugs (measured)
Junk (measured)
Set Whipstock at 9596' (03/01), cemented old Perfs.
PB3 cemented back to Window at 9600' (05/01)
Cemented MD TVD
8 cu yds concrete 110' 110'
1860 cu ft Arcticset III, 1860 cuft AS II 2694' 2694'
1973 cu ft Class 'G' 9479' 8639'
345 cu ft Class 'G' 9197' - 9600' 8384' - 8748'
,,
Perforation depth: measured None
true vertical None
tEC:E VED
Tubing (size, grade, and measured depth)
';-!t~o!,,'~ Oil 8,, tSas 6oss, Oornmissio~
4-1/2", 12.6#, L-80 to 9151' with 4-1/2" tailpipe to 927~1~ ....... ~' Anch0r.s!.~e
Packers and SSSV (type and measured depth) 9-5/8" TIW PBR packer at 9151'; 4-1/2" SSSV Landing Nipple at 1967'
13. Attachments
[] Description Summary of Proposal
4. Estimated date for commencing operation
May 17, 2001
16. If proposal was verbally approved
Tom Maunder
Name of approver
5/21/2001
Date Approved
Contact Engineer Narne/Numbec Alistair Sherwood, 564-4378
[] Detailed Operations Program [] BOP Sketch
Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby certify that the fd,.~g~ing isSUe and correct to the best of my knowledge
Signed AlistairSherwood~~'{(~/'~/'~.~ Title CT DrillingEngineer Date
~:..'~',:./.... :...." ...', :'.. '..', .:~..,.':.,.:',,.:..,':,..',:y,,,:',..,'.::.;.,:...,., ':.......:..:...":.,.:..:.....;'.~,,:~.,..,.,..Com~ssion::~,s?On~y:..,:......:.: ..,:~.,.,..:...:...: ....;. :....:.,.~.,,:,.: :. :..., .. ,:...,,, :. .::,.... .,
'Con',t,on, .o,,, Co , s,on i
~lu~ into~dty ~ BO~/est ~kocation cloaranco ~
Uechanical Integrity lest Subsequent form required 10- ~O ~ ~~ ~'
Approved b~ order of the Commission ~~ ~ ~ ~~ion~r Date ~12~ ~O,~
Form 10-403 Rev. 06/15/88 ~ ~ ~ ~ ~ ~ L Submit In Triplicate
Hubble, Terrie L
From:
Sent:
To:
Cc:
Subject:
Sherwood, Alistair
Monday, May 21,2001 3:17 PM
'Tom Maunder (AOGCC)'
Gantt, Lamar L; Hubble, Terrie L
K-10a, Shutdown of Operations Application
Tomy
BP wish to file a shutdown of operations sundry on K-10a. Below is a summary of well work operations
that took place. The sidetrack has been cemented back to the window and the rig moved off the pad.
CDR will tentatively return to the well in August after the current 5 x Y pad well campaign.
K- 10a Operations Summary
K-10a sidetrack targeted a 450' horizontal section of highly productive Zone 2 reservoir. During drilling,
multiple downhole tool failures were experienced in the Z2 build section. Operations were shutdown following
failure of the 3rd build attempt. The well was left with the sidetrack cemented up to the KOP at 9596'.
The directional plan for this sidetrack honored two criteria. A highside kick off out of K10, and a horizontal
entry into a Z2 target polygon, 200' to the east of K-10. Execution of the plan started with a trouble free exit
into the Sag River off a mechanical whipstock. Drilling through the Shublik, TSAD and Zone 3 conglomerate
intervals was also without serious incident - 220' hole section, 150deg turn, 0.5 o/100 build, max DLS, 32
deg/100'
1st Plugback - broken motor output shaft
Drilling difficulty was first experienced on May 5th. A BHA c/w M09X PDC bit, Baker 2.%° motor and
Weatherford orientator failed to build at the required 32°/100, in Z2. Only 19°/100, was achieved. In order to
make up build a BHA c/w STX-20DX tricone bit, Baker 3° short radius motor and Weatherford orientator was
run. On bottom the motor output shaft broke with zero footage drilled. Two fishing attempts were made, (the
first tagging up on the whipstock) before plugging back with cement just into Z3. Baker have not concluded on
the cause of the shaft failure.
2nd Plugback - backed off motor connection
Difficulty was again experienced on May 9th drilling off the cement plug. The initial BHA c/w M09X PDC bit,
Baker 2.8° motor and Weatherford orientator drilled only 85' before being POOH because of toolface flopping.
The same problem was encountered with the next BHA c/w M09X PDC bit, Weatherford 3° fixed motor and
Weatherford orientator. On POOH it was evident that a backed off sealed connection above the motors bent sub
was responsible for the erratic drilling. Weatherford's preliminary investigation, attributed back off to a sparing
use of 'Lock-tight' thread sealant. The well was plugged back a second time with cement, just into Z3.
3rd & Final Plugback - broken Hi-Load disconnect
The directional plan for the third build attempt was revised on May 11th. At the KOP further right hand turn
would be terminated, drilling would go straight into left hand turn and build. The previous BHA c/w M09X
PDC bit, Weatherford 3° fixed md~ir . and Weatherford orientator drilled 88,''~i _ .~fore breaking at the inner
housing of the disconnect sub.It took 5 days and 10 fishing runs to recover the BHA, all except a lxlxaA'' metal
dog, one of three from the failed disconnect. After attempts to drill with the dog in the hole failed, two further
fishing attempts were made. On the second of these runs a BHA c/w washover shoe, venturi junk basket,
Weatherford 1° fixed motor and Weatherford orientator parted downhole with the breakage of the motor output
shaft. The remaining fish was cemented in hole on May 17th. Nabours CDR1 moved off the well on May 19th.
Regards
Alistair Sherwood
Coil Tubing Drilling Engineer
Alaska Drilling & Wells
Tel: (907) 564 4378
ALASKA OIL AND GAS
CONSERYA~ION COMMISSION
Alistair Sherwood
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
TONY KNOWLES, GOVERNOR
333 W. 7TM AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re:
Prudhoe Bay Unit K-10A
BP Exploration (Alaska) Inc.
Permit No: 201-058
Sur Loc: 2007'SNL, 462'EWL, Sec. 4, T11N, R14E, UM
Btmhole Loc. 158'NSL, 1640'WEL, Sec. 32, T12N, R14E, UM
Dear Mr. Sherwood:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you fi.om obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting determinations are made.
Information regarding a "safety joint" for running the 3-3/16" portion of the planned production liner has
been received from Mr. Ted Stagg. Providing such a "safety joint" equipped with a suitably sized lifting
sub and threaded crossover to mate with the 3-3/16" liner section should lessen the time required to install
the joint should a flow be observed while running the liner. However, be advised that the Commission
views the use of this joint as an interim measure pending the receipt of pipe rams capable of sealing on
this size pipe. Not later than May 15, 2001, Alaska Drilling and Wells (BP Exploration Alaska) is
directed to provide the Commission with information ' regarding the availability/deliverability of rams
sized for 3-3/16" and other such sizes that you may plan to mn.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 036. Sufficient
notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a
test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission
petroleum field inspector on the North Slope pager at 659-3607.
- "' Daniel T. Seamount, Jr.
Commissioner
BY ORDER OF THE COMMISSION
DATED this [ t~ --/6 day of April, 2001
jjc/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
RE: Nordic 3 3/16" Safety Jt
Subject: RE: Nordic 3 3116" Safety Jt
Date: Fri, 30 Mar 2001 10:27:15 -0600
From: "Stagg, Ted O (ORBIS)" <StaggTO@bp.com>
To: '"Tom Maunder'" <tom_maunder@admin.state.ak. us>
Tom,
Yes, plans are the same for all three CTD rigs. We have some differencies
in the BOP stack, ram options and CT size, etc. The equipment for each. rig
is currently being reviewed. This is being worked at the moment and I will
pass on further updates soon.
Ted
..... Original Message- ....
From: Tom Maunder [mailto:tom maunder~admin.state.ak, us]
Sent: Friday, March 30, 2001 6:22 AM
To: Stagg, Ted O (ORBIS)
Cc: Stanley, Mark J (ANC)
Subject: Re: Nordic 3 3/16" Safety Jt
Ted,
Thanks for this information. Are the plans similar for CDR and 3S? I am
presently working on the K-10A and that plan is for ~14 joints of 3-3/16.
Tom
"Stagg, Ted O (ORBIS)" wrote:
> Tom,
> The attached drawing represents the safety joint that would be used if a
> flow were taken while running 3 3/16" liner. This is essentially the same
> procedure that would be followed if we were running slotted liner or a
long
> per[ gun an took a well flow. In the case of the per[ gun, Schlumberger
> supplies the special crossover from the bottom of our safety joint to the
> top gun connection.
> A new lifting sub designed specifically for this application and sized for
> the 3 3/16" elevators will be cut at Unique Machine and should be
available
> in a few days. The first job on Nordic where this will be needed is S-08a
in about 3 weeks time.
Ted
<<Nordic Safety Jt..doc> >
Name: Nordic Safety Jr..doc
Nordic Safety Jt..doc Type: WINWORD File (application/msword)
Encoding: base64
1 of 1 4/3/01 12:54 PM
Safety Joint for 3 3/16" liner
Lifting Sub for 3 3/16' elevators, 2 3/8" Reg. pin
TiW valve 2 3/8" Reg.
XO 2 3/8" Reg. box X 2 3/8" PH-6 pin
2 3/8" PH-6 tubing, 30 ft joint
XO 2 3/8" PH-6 box X 3 3/16" TC II Pin
3 3/16" TC Ii liner
1. Running 3 3/16" liner
2. Notice that well has started to flow, hang 3 3/16" in hand slips
3. Use 3 3/16" elevators to PU Safety Joint from cat walk
4. Stab and make up safety joint to 3 3116" liner
5. PU, pull hand slips, RtH to position 2 3/8" PH-6 across BOP rams.
6. Close upper 2 3~8" combi pipe/slip rams on 2 3~8" PH-6
7. Close TIW valve. Close HeR, Monitor well head pressure below
pipe rams
8. Remove lifting sub. Install non-rotating joint to TIW valve.
9. PU injector head, make up coil to NRJ. Open TIW. Make up
injector to riser and pressure test.
10. Open pipe rams and RIH for well control as needed.
STATE OF ALASKA _
ALASK,t' ILAND GAS CONSERVATION COM~.~' .~SION
PERMIT TO DRILL
20 AAC 25.005
I [] Exploratory [] Stratigraphic Test [] Development Oil
la. Type of work [][] DdllRe. Entry [][] RedrillDeepen lb. Type of well [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 54.30' Prudhoe Bay Field / Prudhoe
3. Address 16. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028299
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AA'C 25.025)
2007' SNL, 462' EWL, SEC. 04, T11 N, R14E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
226' SNL, 2180' WEL, SEC. 05, T11N, R14E, UM K-10A Number 2S100302630-277
At total depth 9. Approximate spud date
158' NSL, 1640' WEL, SEC. 32, T12N, R14E, UM 04/02/01 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and 'I-VD)
ADL 028304, 158' MDI No Close Approach 2560 10493' MD / 8980' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 9575' MD Maximum Hole Angle 90 ° Maximum surface 2244 psig, At total depth ('I'VD) 8800' / 3300 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement,
Hole Casing Wei.(:ll~t Grade Couplin,§ 'l_en,qth MD TVD MD TVD (include stage data)
3-3/4"' 3'3/16. x2-7/8,, 6.2 / 6.16# L-80 ST-L 1277' 9216' 8387' 10493' 8980' 56 c~J ft Class 'G'
...............
19. To be completed for' Redrill, Re-entry, and' Deepe'n Operations.
Present well condition summary
Total depth: measured 10150 feet Plugs (measured) AJaska Oil & Gas Cons. Commission
true vertical 9245 feet Anchorage
Effective depth: measured 10090 feet Junk (measured) IBP Pushed to Bottom (03/92)
true vertical 9190 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" 8 cu yds concrete 110' 110'
Surface 2666' 13-3/8" 1860 cuft Arcticset III, 1860 cuft AS II 2694' 2694'
Intermediate 9451' 9-5/8" 1973 cuft Class 'G' 9479' 8639'
Production
Liner 937' 7" 345 cuft Class 'G' 9197' - 10134' 8384' - 9230'
Perforation depth: measured Open: 9949' - 9958'
Sqzd: 9575' - 9613', 9864' - 9869', 9912' - 9949'
true vertical Open: 9063' - 9071'
Sqzd: 8725' - 8760', 8986' - 8990', 9029' - 9063'
20. Attachments .... I~1 Filing Fee ..... []"Pr0perty Plat "'llil BoP Sketch [] Diverter Sketch [] Drilling Program .....
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis r"l Seabed Report [] 20 AAC 25.050 Requirements
'"Contact Engineer Name/Number: Alistair Sherwood, 564-4378 ......... Prepared By Name/Number: Terrie Hubble, 564'-'4628' '
21. I hereby certify tl~at the foreClpingCi.~, truAa~'nd correct t~the best of my knowledge ,, / '
#~'~,.//~ '¥ /I ~
Signed A,istairSherwood .¢If~;>//~({(.~//V2C/,A~Z~C'~y~ Title CT Drilling Engineer Date
· , ........ ~r. lf."'- ..... ............. ...; . · .. ............... ' .... .../-. ......
". · ': '. ' :.'.".:.'...':; :' '"'" '~ ::.."..'.' "..2 :' .' '.'." "': ' ." '~ :.': '. ".. :..'" ..i :: .::.;'~ ..:! .: :: ..;..; .'.:.' ....:....cornm'jssi0 .n U.seOnly.':.::. ,..:':...:..:.'.'"..'.'..'...' .::..:'."!".:.... ....... . :..~. :'~... '.. ::'.': ..':"..'..: .... :".:.... ~'..': ...'". '..'.::~'...,...". · :.: .
Permit NUmber ..... I' 'APl"Number ' ' ' ' I '"" ApProval Date,' ' I See overletter "
~_ c,.,,, ... ~ ~,¢' 150'029'21762'01 I ,¢//.///.~..~, /r i for other requirenqents
Conditions of Approval: Samples Required [] Yes ,l~'No Mud Log Required [] Yes ,~ No
Hydrogen Sulfide Measures ]~ Yes [] No Directional Survey Required ,[~ Yes [] No
Required Working Pressure for DOPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K J~.5K psi for CTU
Other:
.. o .er o,
Approved By D Taylor Se. am...ou, nj , · qommissioner the commission Date _
Form 10-401 Rev. 12-01-85
Submit In Triplicate
BPX
K-10a Sidetrack
Summary of Operations:
K-10 is shut-in because the production GOR can no longer be managed. P&A lng the existing perforations
and sidetracking the well to a Zone 2 target will rejuvenate well productivity. Accessing the Zone 2 target
polygon calls for a high kick off point. This is why the mechanical whipstock is being set up in the Sag River
Formation forcing the well to be drilled through Zone 4 sands and the Zone 3 conglomerate. Specific prep
work, (Phase 1) and drilling, (Phase 2) operations are detailed below.
--I'" Phase 1- Set whipstock & P&A existing Perfs. Planned for Mar. 26-28, 2001
~--q'~" · Drift well with dummy whipstock.
_~,~ / · Set 7 x 4.1/2" mechanical whistock using e-line at approx. 9575'
~\ ~,,(~) ~ ~ Pump & squeeze 25bbls of cement to P&A current perfs. Wash out excess above whipstock..
Pha e 2: Drill and Complete sidetrack: Planned for April 2, 2001
2.3/8" coil will be used to:
· Mill off the whipstock a 3.8" window in the 7" casing. '~t\\X ~' ~"~f~'~ '1~
· Drill a 920 feet, 3.3,4'' sidetrack, (as per attached plan).
· Run and cement a 3 3/16'x 2 7/8" combination liner. ~,,~,~\\
Mud Program: · Phase 1: Seawater
· Phase 2: Seawater and Fie-Pro (8.5 - 8.6 ppg)
Disposal:
· No annular injection on this well.
Alaska Oil & Gas C0~s. Commission
Anchorage
All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
All Class I wastes will go to Pad 3 for disposal.
Casing Program:
· 3 3/16' x 2 7/8" L-80, solid liner be run from TD into the 4.1/2" tailpipe. The 14 jts of 3 3/16 liner place
the crossover just below the window leaving a future sidetrack opportunity. Approx 10bbls of cement
will be used to cement the liner putting TOC in the 7" liner at 9475 ft.
Well Control: · BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2000 psi.
Directional · See attached directional plan
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging · An MWD Gamma Ray log will be run over the open hole section.
· A memory CNL log will be run to map the GOC prior to perforating.
Hazards
H2S at 10 ppm is not a significant hazard. The sidetrack is to be drilled into a completely un-faulted zone
so the lost circulation risk is Iow.
Reservoir Pressure
Res. press, is estimated to be 3300 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface
is 2244 psi.
K-lOa
Hazards
Please perform pre-job Hazard ID and Safety meetings prior to every change in work
scope during the operation. At any stage in the operation, if things don't look right,
shut-down the operation and discuss the situation before making the next move.
SAFETY FIRST
· H2S is not expected. K-Pad wells are not sour.
· '3300 psi @ 8800ss is the BHP prognosis - equivalent to a 7.2ppg fluid.
· 2244 psi is the maximum WHP possible assuming a full gas column.
· Zero faults make for a very Iow lost circulation risk.
· Pressure along the wellpath is predicted to be constant.
· Good to excellent rock quality in the zone to be drilled reduces the risk of multiple BHA
change-outs.
Alaska Oil & Gas Cons. Comrrlissior';
Anchorage
FREE = 6" CIW
WELLHEAD= MCEVOY
'~'~'P = 3000'
Max Angle = 36 @ 6000'
:)arum MD = 9718
Datum TVD=- 8800'SS
I 13-3/8"CSG,72#,S95,BTRS,.1481bpf,ID=12.347 Jd 2694'
9-5/8" 47# L-80,NSCC Id 4635'
IMinimum ID = 3.725 @ 9236'
4 1/2" OTIS XN NIPPLE
I 4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID:3.958
9197'
~'2'-~'
9-5/8" CSG, 47#, L-80,BTRS 0.0732 bpf, ID=-8.681 Id 9479' ~,~
PERFORATION SUMMARY
REF LOG: BHCS 11-16-87
ANGLE AT TOP PERF: J26 @ 9575'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3 3/8 4 9575' - 9613' C 2/26/1992
3 3/8 4 9596'- 9598' C 1/28/1994
3 3/8 4 9864' - 9869' C 1/28/1994
3 3/8 4 9912'- 9958' C 1/28/1994
3 3/8 4 9949'- 9958' O 2/26/1992
I ~ I-I
7" TBG, 26#, L-80,BTRS, 0.0383 bpf, ID=6.276 Id
10092'
10134'
K-10
i" I SAFETY NOTES
1967' [~ 41/2" CAM SSSV LANDING NIP, ID=3.813 {
GAS LIFT MANDRELS
IS~A I ~ I ~v~ I ~v I~'~MA.1 "^~'CH I
4 13018'12945'1 61 OTiS I--RA I
1 I 89971 S~50'l 241 O~
9067' [~ 4 1/2" BKR (MOD. L) SL.SLV., ID:3.8131
9135' I--~ 4 1/2" TUBING SEAL ASSY I
9151' I"~ 9 5/8" TIW PACKER, ID:4.750 I
9197'
1/2" OTIS X NIPPLE, ID: 3.813
9236' ]d 4 1/2" OTIS XN NIPPLE, ID=3.725 I
9271' I'~ 4 1/2" TIW TUBING TAIL, ID:3.958 I
9278' Id ELMDI
9492' Id MARKERJO'NTI
'RECEIVED
MAR ]. ~[ 2,0 01
Alaska Oil 8, Gas Cons. Commission
Anchorage
10090' J'-'~ IBP PUSHED TO BO'I-rOM 3/6/92 J
DATE REV BY COMMENTS
03/09/98 INITIAL COMPLETION
01/05/00 SIS-QAA CONVERTED TO CANVAS
01/11/01 SIS-LG REVISION
01/17/01 SIS-MD FINAL
PRUDHOE BAY UNIT
WELL: K-10
PERMIT No: 87-114
APl No: 50-029-21762-00
Sec. 4, T11N, R14E
BP Exploration (Alaska)
_
WELLHEAD= MCEVOY
,~'CTOATOR= AXELSON
BF¥ EL'Ev= 26~3'8'
KOP = 3000'
~ A,-~9~'=' 36
'ba~-~-Ub-;" ....... 97'i"8
'b~(~-T~'[:); 880o,ss
MAR I & 2001
Alaska Oil & Gas Cons, Commission
Anchorage
I 13-3/8"CSG,72#,S95,BTRS,.1481bpf,ID=12.347 Id
K-10a ,:' I SAFETY NOTES
E 1967;-' id 41/2- CAM sssv LANDING NIP, ID=3.813
2694' GAS LIFT MANDRELS
I s~^ I ~° I TV~ I ~v I~~.1 .:~To.I
,4,3o18',2945', 6, °~ I ~1'
-~ 3 I 6069'1 5657'1 351 OTIS
4635' ! 2 I 8574'J 7787'I 251 OTIS
/ 1,1 8997[ 8150'I 241 OTIS .
9067 J--I 4 1/2" 8KR(MOD. L) SL.SLV., ID=3.813I
9135' I--'l 41/2" TUBING SEAL ASSY I
Minimum ID = 3.725 @ 9236'
4 1/2" OTIS XN NIPPLE
[ TOPOF 7"LNR Id 9197'
I 4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID=3.958 Id 9271'
9-5/8" CSG, 47#, L-80,BTRS 0.0732 bpf, ID=8.681 J-"[ 9479'
I 9492' I-t ~~°'"TI
9151' I--I 9 5/8" TIW PACKER, ID=4.750 J
9197' Id
~2~' Id
~27~' I-I
9400'I
4 1/2" OTIS X NIPPLE, ID= 3.813
4 1/2" OTIS XN NIPPLE, ID=3:725
4 1/2" TIVV TUBING TAIL, ID=3.958 I
desired cement top I
F16" LINER I
I 9575'
Id Top of Whipstock
PERFORATION SUMMARY
REF LOG: BHCS 11-16-87
ANGL~¥~'~"'~F'~'~'"-'~126 @ 9575' I
Note: Refer to Production DB for historical perf data
SIZE SPF' INTERVAL Opn/Sqz DATE
3 3/8 4 9575' - 9613' C 2/26/1992
3 3/8 4 9596'- 9598' C 1/28/1994
3 3/8 4 9864'- 9869' C 1/28/1994
3 3/8 4 9912'- 9958' C 1/28/1994
3 3/8 4 9949' - 9958' O 2/26/1992
I PBT~I--I
7" TBG, 26#, L-80,BTRS, 0.0383 bpf, ID=6.276 id
10092'
10134'
10090'
12-7/8", 6.4#, ST-L, L-801 , I ~10,500'md I
Id IBP PUSHED TO BO-I-rOM 3/6/92
DATE REV BY COMMENTS
03/09/98 INITIAL COMPLETION
01/05/00 SIS-QAA CONVERTED TO CANVAS
01/11/01 SlS-LG REVISION
01/17/01 SIS-MD FINAL
03/12/01 AS CTD Sidetrack
PRUDHOE BAY UNIT
WELL: K-10
PERMIT No: 87-114
APl No: 50-029-21762-00
Sec. 4, T11N, R14E
BP Exploration (Alaska)
Vertical Section
0
8650
8700
8750
8800
500
K-10
Path Distance (Feet)
1,000
I
1,500
Angle @ K.O.: 26
deg MD:9575
-TSGR
-TSAD
K-10a
case t03
Dec. ll,2000
Ted x4694
2,000
1
~8850
89OO
8950
9000
9050
ZONE 3
10493 TD
rel M5
Marker Depths ~::)rig Wellbore
TZ3 I 8,83ol.
TZ2C-8885 J 8,885Jrt I'VD
~,oool 9,ooolft TVD
TSAD I 8,744lft TvD
IKick Off 8,671 Ift TVD
9,575jft MD
JDeprtr @KO 3,172 fl
I MD KO Pt 9,575J
MD New Hole 918j
I
Total MD 10,493 J
TVD TD 8.980J
DLS
deg/lO0
Curve 1 " 6 45 ~30~
Curve 2 32 90 145
Curve 3 32 901 80
Curve 4 32 -30 224
Curve 5 10 -90 439
918
Tool Face Length
Drawn: #########
15:22
Plan Name: Case 122
I
-3,500
K-10
K-10a
Case 103
Dec, 11, 2000
Ted x4694
TSG
~3,000 -2,500 -2,000
X distance from Sfc Loc
I
-1,500
4,500
4,000
3,500
3,000
2,500
2,000
1,500
-1,000
TSGR
Well Name K- 10 I
CLOSURE
IDistance 3,023 ft
Az 314 deg
NEW HOLE
E/W (X) N/$ ,(V)
Kick Off -2,661 1,698
TD -2,157 2,118
State Plane 668,575 5,977,314
Surface Loc 670,732 5,975,196
DIS
deg/1 O0 Tool Face Length
Curve 1 "- 6 45 30
Curve 2 32! 90 145
,,
Curve 3 32 90 80
Curve 4 32~ -30 224
Curve 5 10 -90 439
918
Drawn: #########
15:22
Plan Name: Case 122
Pr]
CDR1
BOP Wel~' ead Stack for Drillint~i" ~perations
Rig tqoor
~-1/2' Lubrlc~W~'
MAR I 4
Oil & Gas Cons.
,Anchorage
5.59'
11.2'
12.9.'
15.85'
15.89`
16.65'
19.5'
21.1'
I
Shaffer BOPE 5K W.P ' I
T.O.T. BOPE 5K W.P '
Annular BOP (HydrlD %1/16" ID
BOP (Hydrll) %1/16" ID
Top Blind / Shear
Btm 2.3/8' Variable Rams
Top 2.7/8' Pipe / SHps
Btm 2.3/8' Pipe / Slips
Manual Master Valve
9-5/~r Annulus
13-~/~ Annulu~
Ground Level
20 AAC 25.040 '
WELL IDENTIFICATION.
(a) Every well must be identified by a sign posted in a conspicuous place. During
the period of tim6 from commencement of drilling operations to well completion,
.suspension, or abandonment, the sign must be on or near the drill rig, but not more than
100 feet from the well. After'well completion or suspension, the well sign must be at the
wellhead, or on the wellhead building. The si~n must be of durable construction, large
enough to be legible under normal conditions at a distance of 50 feet, and maintained in
legible condition. Each sign must show the
(1) name designated by the operator under 20 AAC 25.005(~) for the well
drilled from the surface location; (2) name of the owner;
(3) name of the operator if different from the owner;
(4) API number that the commission has, under (b) of this section, assigned
to the well;
(5) well surface location by governmental quarter section, section,
township, and range; and
(6) 'Permit to Drill number that the commission has assigned under. (b) of
this,, section.
(b) The commission will assign a Permit to. Drill number and an APl number when
a Permit to Drill (Form 10-401) is approved.
, ,.
' (c) FOr platforms o~ multiple-well drill sites, the information required in (a)(2) -
(a)(5) of this section may be posted on one sign on the platform or at the entrance to the
drill site.
History-
Eft. 4/~.13/80, Register 74; am 4/2/86, Register 97; am 11/7/99, Register 152
Authority -
AS 31.05.030
, ,
20 AAC 25.045
SEALING OFF STRATA
Repealed or Renumbered
Repealed 4/2/86.
20 AAC 25.047 :,
RESERVE PITS AND TANKAGE.
(a) Before a person commences drilling a well, a reserve pit must be constructed
or tankage installed for the reception and confinement of drilling fluids'"and cuttings, to
facilitate the safety of the drilling operation, and to prevent contamination of tYeshwater
and damage to the surface environment. The confining surface~of a reserve pit must be
24
VENDOR . ALASKAO I LA O0
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET
012901 CK012901I 100. O0 100. O0
PYMT (:OMMENTS: Pe~it to Deill ['ee
HANDL]N~ INST: S/H- Teeeie Hubl le X4~28
'IE ATTACHED CHECK IS IN PAYMENT FOR IT~m DES~iGED ABOVE. --I[tllf-~llE ~-- 100. O0 100. O0
:BP.EXPLORATION (ALASKA),:.:.IN:C. ! !: ,:?,,:,,,~.
i:':~.O.":~:~:i. 196612':'i'?::::':i;::~;"~':~ ?:,.? ,i,:; ,.; ':'"~'":> :~' '
'.."ANG:H0~A~E;:i,A~SE~~: 99519-6612 :i;!'!:i:ii/':! ,',,::,:.':" ?,:~,.. i:':'i:i'::"
PAY
TO" ..The'...:,
DRDER.!. '.~
· .
::,ALASKA OIL AND :!::,0AS:::?.:,, "'": ., ' :,:'" :::," .~. ,.
CioNS~RVAT I ON i:'i C~HH:.i~,,s~:;i o~ ::!,i ;" "! ?!
ANCHORAOE AK 9~501
NG
IIm ~,R ~A::L 5A~I,m
008 N h &
, , ,
FIELD & POOL (~'/---~E:~.,/.5"4;:3 INIT CLASS ,/'~,,~' ,/.-,~,,~
I ADMINISTRATION
WELL NAME
1. Permit fee attached .......................
2. Lease number appropriate ...................
3. Unique well name and number ..................
4. Well located in a defined pool ..................
5. Well located proper distance from drilling unit boundary ....
6. Well located proper distance from other wells ..........
7. Sufficient acreage available, in ddlling unit ............
8. If deviated, is wellbore plat included ............. . .
9. Operator only affected party ...................
10. Operator has appropriate bond in force .............
11. Permit can be issued without conservation order ........
12. Permit can. be issued without administrative approval ......
13. Can permit be approved before 15-day wait ...........
PROGRAM:exp
GEOLAREA
dev b/' reddl ../ serv., wellbore sag ann. disposal para req
~.~' ~) UNIT# /./~'~-'¢t,~ ON/OFF SHORE . <:~,,,~
N
ENGINEERING
:~ D4TE
~/~r~
14. Conductor stdng provided ...................
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
17. CMT vol adequate to tie-in long string to surf csg ........
18. CMT will cover all known productive horizons ..... ' .....
19. Casing designs adequate for C, T, B & permafrost .......
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved...
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24, Drilling .fluid program schematic & equip list adequate .....
25. BOPEs, do they meet regulation ................
26. BOPE press rating appropriate; test to ~"t~ Dsig.
27. Choke manifold complies w/APl RP-53 (May 84) .........
28. Work will occur without operation shutdown ...........
29. Is presence of H2S gas probable .................
GEOLOGY . 30. Permit can be issued wlo hydrogen sulfide measures ..... Y N/
~ 31. Data presented on potential overpressure zones .....
' 32. Seismic analysis of shallow gas zones ..........
!1APPR D, AT~/ 33. seabed condition survey (if off-shore), ............ ~ Y N~ "- '
,,I]/~-" ~.,/?~//z~ 34. Contact name/phOne for weekly progress reports [explorato.~nly] Y N
II ANNULAR DISPOSAL35. With proper cementing records, this plan .
APPR DATE
(A) will contain waste in a suitable receiving zone; ....... Y N
(B) will not contaminate freshwater; or cause ddlling waste y N
to surface;
(C) will not impair mechaniCal integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
GEOLOGY:
ENGINEERING:. UlCIAnnular
1,..->
COMMISSION:
Comments/Instructions:
0
Z
0
.--I
c:~nsoffice\wordian~diana\checklist (rev. 11101fl00) .
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
. nature is accumulated at the end of the file under APPENDIXi
..
No 'special'effort has been made to chronologically
organize this category of information.
· ; ·
..
**** REEL HEADER ****
MWD
01/11/22
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
01/11/22
155241
01
1.75" NaviGamma - Gamma Ray
in
adjusts
*** LIS COMMENT RECORD
Remark File Version 1.000
Extract File: ldwg.las
~Version Information
VERS. 1.20:
WRAP. NO:
~Well Information Block
#MNEM. UNIT Data Type
STRT.FT 9606.0000:
STOP.FT 9907.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMP. COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API . API NYUMBER:
~Parameter Information Block
#MNEM. UNIT
SECT.
TOWN N
RANG
PDAT
EPD F
LMF
FAPD F
DMF
EKB F
EDF F
EGL F
CASE F
OS1
~Remarks
Value
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration, Inc.
K-10APB3
Prudhoe Bay Unit
2007' SNL, 462' EWL
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Gamma Ray
il-May-01
500292176272
04
lin
14E
MSL
0
RKB
54.30
KB
54.30
N/A
N/A
N/A
DIRECTIONAL
Description
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) Ail depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data.
(4) Baker Hughes INTEQ runs 10 utilized Directional and Gamma Ray services to
sidetrack and drill from 9814' MD ( 8886' SSTVD) to 9893' MD (8949' SSTVD)
3-3/4' hole.
(5) Well K-10APB3 was drilled to 9893' MD (8949' SSTVD) on Run 10.Final Tie-in
TD to 9907' MD (8949' SSTVD).
(6) The interval from 9877' MD (8937' SSTVD) to 9907' MD (8949' SSTVD)
was not logged due to sensor to bit offset.
(7) The data presented is final and has been depth shifted to a PDC
(Primary Depth Control) supplied by BPX (SWS, 27-Jun-2001).
(8) A Magnetic Declination correction of 26.71 degrees has been applied
to the Directional Surveys.
MI~EMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units)
ROPS -> Rate of Penetration, (feet/hour)
TVD -> Subsea True Vertical Depth (SSTVD), (feet)
SENSOR OFFSETS:
RUN GAMMA DIRECTIONAL
10 23.88 28.68
CURVE SHIFT DATA
BASELINE MEASURED,
9611 85,
9615 12,
9616 96,
9618 39,
9624 33,
9626 57,
9634 75,
9643.75,
9658.68,
9665.43,
9669.72
9675.57
9681.09
9688.87
9692.14
9697.04
9698.27
9703.38
9708.91
9725 57
9739 07
9762 18
9783 51
9790 05
9818 68
9611.65
9614.71
9617.78
9619 62
9624 12
9626 98
9632 50
9641 71
9655 61
9661 95
9667 27
9673 12
9678 84
9686 62
9690 30
9695 20
9696 23
9701 34
9707 07
9724 14
9737 43
9760 95
9777 37
9782 89
9809.27
EOZ
END
DISPLACEMENT
0.204102
0.40918
-0.818359
-1.22754
0.204102
-0.40918
2 25
2 0459
3 06738
3 47656
2 4541
2 4541
2 24902
2 25
1 83984
1 84082
2 04492
2 0459
1 83984
1 43164
1 63574
1 22656
6.13477
7.15723
9.40625
BASE CURVE: GRAXll0 (K-10APB1 GRAX), OFFSET CURVE: GRAX
Tape Subfile: 1
92 records...
Minimum record length:
Maximum record length:
10 bytes
132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN K-10APB3
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 27-Jun-01.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
1 GR GRAX310 0.0
2 ROP ROPS310 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Nuntber of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool
1 GR MWD
2 ROP MWD
Code Samples Units Size
68 1 API 4
68 1 F/HR 4
Length
4
4
8
Total Data Records: 15
Tape File Start Depth = 9606.000000
Tape File End Depth = 9907.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
Minimum record length:
Maximum record length:
24 records...
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN K-10APB3
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MI~EM CHAN DIMT CNAM ODEP
1 GRAX GRAX 0.0
2 ROPS ROPS 0 . 0
FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frarae Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRAX MWD 68 1 API
2 ROPS MWD 68 1 F/HR
Size Length
4 4
4 4
8
Total Data Records: 15
Tape File Start Depth = 9606.000000
Tape File End Depth = 9907.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3
Minimtun record length:
Maximum record length:
24 records...
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
01/11/22
155241
01
**** REEL TRAILER ****
MWD
01/11/22
BHI
01
Tape Subfile: 4
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH GR ROP
9606.0000 -999.2500 -999.2500
9606.2500 -999.2500 -999.2500
9700.0000 31.1413 13.0111
9800.0000 16.9017 100.3873
9900.0000 -999.2500 14.9571
9907.0000 -999.2500 -193.5209
Tape File Start Depth = 9606.000000
Tape File End Depth = 9907.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH
9606
9606
9700
9800
9900
9907
GRAX
0000 -999
2500 36
0000 24
0000 15
0000 -999
0000 -999
ROPS
2500 -999.2500
5230 -999.2500
3480 10.3850
8260 226.0970
2500 -999.2500
2500 -999.2500
Tape File Start Depth = 9606.000000
Tape File End Depth = 9907.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS
**** REEL HEADER ****
MWD
01/11/22
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
01/11/22
155241
01
1.75" NaviGamma - Gamma Ray
*** LIS COMMENT RECORD ***
Remark File Version 1.000
Extract File: ldwg.las
~Version Information
VERS. 1.20:
WRAP. NO:
~Well Information Block
#MIqEM.UNIT Data Type
STRT.FT 9606.0000:
STOP.FT 9992.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMP. COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API . API NYUMBER:
-Parameter Information Block
~MNEM.UNIT Value
SECT. 04
TOWN.N lin
RANG. 14E
PDAT. MSL
EPD .F 0
LMF . RKB
FAPD.F 54.30
DMF . KB
EKB .F 54.30
EDF .F N/A
EGL .F N/A
CASE.F N/A
OS1 . DIRECTIONAL
~Remarks
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
...............................
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration, Inc.
K-10APB1
Prudhoe Bay Unit
2007' SNL, 462' EWL
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Gamma Ray
06-May-01
500292176270
Description
........................................
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) Ail depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data.
(4) Baker Hughes INTEQ runs 1-7 utilized Directional and Gamma Ray services to
drill formation from 9606' MD ( 8699' SSTVD) to 9984' MD (9003' SSTVD) in
3-3/4' hole.
(5) Well K-10APB1 was kicked off from Well K-10 and drilled to TD at 9984' MD
(8995' SSTVD) on Run 7. Final Tie-in adjusts TD to 9992' MD (9003' SSTVD).
POOH to cement plug and sidetrack thereafter.
(6) The interval from 9967' MD (8995' SSTVD) to 9992' MD (9003' SSTVD)
was not logged due to sensor to bit offset.
(7) The data presented is final and has been depth shifted to a PDC
(Primary Depth Control) supplied by BPX (SWS, 27-Jun-2001).
(8) A Magnetic Declination correction of 26.74 degrees has been applied
to the Directional Surveys.
MNEMONICS:
GRAX
ROPS
TVD
-> Gamma Ray MWD-API [MWD] (MWD-API units)
-> Rate of Penetration, (feet/hour)
-> Subsea True Vertical Depth (SSTVD), (feet)
SENSOR OFFSETS:
RUN GAMMA
1 25.05
2 25.05
3 25.00
4 25.00
5 24.48
6 24.57
7 24.48
DIRECTIONAL
29 85
29 85
29 80
29 80
29 28
29 37
29 28
CURVE SHIFT DATA
BASELINE
9615 42
9622 97
9630 96
9639 30
9647 51
9661 86
9671 25
9701 15
9718 85
9724 92
9738 08
9739 71
9747 87
9755 93
9768 90,
9777 88,
9799 80,
9811 05,
9847 78,
9866 39,
9889 18,
9975 46,
9986 24,
9993 25,
10010 0,
10041 8,
10047 0,
10056 3,
10066 5,
10078 7,
EOZ
END
MEASURED,
9611.53
9617 85
9630 76
9636 85
9643 62
9658 59
9665 32
9698 28
9715 99
9721 85
9731 94
9733 99
9742 35
9749 80
9763 78
9771 75
9794 07
9806 15
9841 65
9862 50
9884 48
9968.50
9979.90
9986.91
10003 5
10036 2
10040 1
10049 1
10058 9
10071 0
DISPLACEMENT
-3 88477
-5 11328
-0 204102
-2 4541
-3 88477
-3 27246
-5 92969
-2 86328
-2 8623
-3 06738
-6 13574
-5 72656
-5 52148
-6 13477
-5 1123
-6 13477
-5 72656
-4 90723
-6 13477
-3 88574
-4 70312
-6 95312
-6 33984
-6 33984
-6 54395
-5 52148
-6 95312
-7 15723
-7 56641
-7 77148
BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1
104 records...
Minimum record length:
Maximum record length:
10 bytes
132 bytes
FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MN-EM VALU
............................
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN K-10APB1
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COM~4ENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 27-Jun-01.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM ODEP
1 GR GRAXll0 0.0
2 ROP ROPSll0 0.0
FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: IF ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 API
2 ROP MWD 68 1 F/HR
Size Length
4 4
4 4
8
Total Data Records: 10
Tape File Start Depth = 9606.000000
Tape File End Depth = 9992.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
Minimum record length:
Maximum record length:
19 records...
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
............................
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN K-10APB1
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
PINEM CHAN DIMT CNAM ODEP
............................
1 GRAX GRAX 0.0
2 ROPS ROPS 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datu/n Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: IF ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool
1 GRAX MWD
2 ROPS MWD
Code Samples Units
68 1 API
68 1 F/HR
Size Length
4 4
4 4
8
Total Data Records: 10
Tape File Start Depth = 9606.000000
Tape File End Depth = 9992.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3
19 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
01/11/22
155241
01
**** REEL TRAILER ****
MWD
01/11/22
BHI
01
Tape Subfile: 4
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH
9606
9606
9700
9800
9900
9992
GR
0000 -999
5000 36
0000 103
0000 16
0000 26
0000 -999
ROP
2500 -999.2500
5668 -999.2500
2375 13.5583
7163 77.8788
3232 44.7619
2500 25.0240
Tape File Start Depth = 9606.000000
Tape File End Depth = 9992.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
9606.0000 -999.2500 -999
9606.5000 36.5640 -999
9700.0000 21.4700 10
9800.0000 16.9230 31
9900.0000 58.6490 75
9992.0000 -999.2500 -999
2500
2500
3850
0970
8280
2500
Tape File Start Depth = 9606.000000
Tape File End Depth = 9992.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS
**** REEL HEADER ****
MWD
01/11/22
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
01/11/22
155241
01
1.75" NaviGamma - Gamma Ray
RECEIVED
9 2001
Afsska Oil & Gas Cons. Commissior,.
Anchorage
*** LIS COM~4ENT RECORD
Remark File Version 1.000
Extract File: ldwg.las
-Version Information
VERS. 1.20:
WRAP. NO:
~Well Information Block
#MNEM.UNIT Data Type
STRT.FT 9606.0000:
STOP FT 10052.0000:
STEP FT 0.5000:
NULL -999.2500:
COMP COMPANY:
WELL WELL:
FLD FIELD:
LOC LOCATION:
CNTY COUNTY:
STAT STATE:
SRVC SERVICE COMPANY:
TOOL TOOL NAME & TYPE:
DATE LOG DATE:
API API NYUMBER:
-Parameter Information Block
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
...............................
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration, Inc.
K-10APB2
Prudhoe Bay Unit
2007' SNL, 462' EWL
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Gamma Ray
10-May-01
500292176271
#MNEM.UNIT Value Description
SECT. 04 : Section
TOWN.N lin : Township
RANG. 14E : Range
PDAT. MSL : Permanent Datum
EPD .F 0 : Elevation Of Perm. Datum
LMF . RKB : Log Measured from
FAPD.F 54.30 : Feet Above Perm. Datum
DMF . KB : Drilling Measured From
EKB .F 54.30 : Elevation of Kelly Bushing
EDF .F N/A : Elevation of Derrick Floor
EGL .F N/A : Elevation of Ground Level
CASE.F N/A : Casing Depth
OS1 . DIRECTIONAL : Other Services Line 1
~Remarks
(1) Ail depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data.
(4) Baker Hughes INTEQ runs 8-9 utilized Directional and Gamma Ray services to
sidetrack and drill from 9798' MD ( 8872' SSTVD) to 10050' MD (9049' SSTVD)
in
(5)
MD (8872'
3-3/4' hole.
Well K-10APB2 was drilled (side-tacking well K-10APB1) on Run 8, from 9798'
SSTVD) after pumping a cement plug on well K-10APB1.
(6)
adjusts TD
(7)
(7)
(8)
Well K-10APB2 was drilled to 10050' MD (9049' SSTVD) on Run 9. Final Tie-in
to 10052' Md (9049' SSTVD). POOH to cement plug and sidetrack thereafter.
The interval from 10028' MD (9035' SSTVD) to 10052' MD (9049' SSTVD)
was not logged due to sensor to bit offset.
The data presented is final and has been depth shifted to a PDC
(Primary Depth Control) supplied by BPX (SWS, 27-Jun-2001).
A Magnetic Declination correction of 26.73 degrees has been applied
to the Directional Surveys.
MNEMONICS:
GRAX
ROPS
TVD
-> Gamma Ray MW~D-API [MWD] (MWD-API units)
-> Rate of Penetration, (feet/hour)
-> Subsea True Vertical Depth (SSTVD), (feet)
SENSOR OFFSETS:
RUN GAMMA DIRECTIONAL
8 24.58 29.38
9 24.01 28.81
CURVE SHIFT DATA
BASELINE
9612 01
9617 96
9619 60
9623 88
9634 30
9642 08
9655 78
9658.23
9666.96
9673.51
9678.82
9680 87
9686 80
9690 48
9696 00
9723 81
9737 56,
9749 36,
9760 67,
9782 89,
9810 71,
9868 78,
9906 41,
9919.91,
EOZ
END
MEASURED,
9611.61,
9617.15,
9618.58,
9624.49,
9636.76,
9644.12
9658.64
9661.50
9669.42
9675 96
9680 87
9683 12
9688 44
9692 73
9698 25
9725 45
9738 99
9750 58
9762 30
9790 26
9818 89
9866 12
9900 89
9917 66
DISPLACEMENT
-0.40918
-0.817383
-1.02246
0.614258
2.4541
2.0459
2.8623
3.27148
2.4541
2.4541
2 04492
2 24902
1 63574
2 25
2 24902
1 63574
1 43066
1 22754
1 63574
7 3623
8 18066
-2.6582
-5.52148
-2.25
BASE CURVE: GRAXll0 (GRAX K-10APB1), OFFSET CURVE: GRAX
Tape Subfile: 1
94 records...
Minimum record length:
Maximum record length:
10 bytes
132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
............................
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN
FN
COUN
STAT
K-10APB2
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 27-Jun-01.
*** INFORMATION TABLE: CIFO
MN-EM CHAN DIMT CNAM ODEP
1 GR GRAX212 0.0
2 ROP ROPS212 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool
1 GR MWD
2 ROP MWD
Code Samples Units Size
68 1 API 4
68 1 F/HR 4
Length
4
4
8
Total Data Records: 22
Tape File Start Depth = 9606.000000
Tape File End Depth = 10052.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
Minimum record length:
Maximum record length:
31 records...
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MAFEM
WDFN
LCC
CN
WN
FN
COUN
STAT
VALU
............................
mwd.xtf
150
BP Exploration, Inc.
K-10APB2
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw.data.
*** INFORMATION TABLE: CIFO
FINEM CHAN DIMT CNAM ODEP
....................................................
1 GRAX GRAX 0.0
2 ROPS ROPS 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: IF ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool
1 GRAX MWD
2 ROPS MWD
Code Samples Units Size Length
68 1 API 4 4
68 1 F/HR 4 4
8
Total Data Records: 22
Tape File Start Depth = 9606.000000
Tape File End Depth = 10052.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3
Minimum record length:
Maximum record length:
31 records...
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
01/11/22
155241
01
**** REEL TRAILER ****
MWD
01/11/22
BHI
01
Tape Subfile: 4
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH GR
9606.0000 -999.2500
9606.2500 -999.2500
9700.0000 96.1475
9800.0000 19.5721
9900.0000 16.1666
10000.0000 40.0050
10052.0000 -999.2500
ROP
-999.2500
-999 2500
13 5834
101 9935
28 9290
41 4180
65 1540
Tape File Start Depth = 9606.000000
Tape File End Depth = 10052.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH GRAX
9606.0000 -999
9606.2500 36
9700.0000 24
9800.0000 18
9900.0000 12
10000.0000 26
10052.0000 -999
ROPS
2500 -999
5230 -999
3480 10
5140 226
8690 28
8340 47
2500 -999
2500
2500
3850
0970
0040
4900
2500
Tape File Start Depth = 9606.000000
Tape File End Depth = 10052.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS
**** REEL HEADER ****
MWD
01/11/22
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
01/11/21
155241
01
1.75" NaviGamma - Garama Ray
*** LIS COMMENT RECORD ***
Remark File Version 1.000
Extract File: ldwg.las
-Version Information
VERS. 1.20:
WRAP. NO:
-Well Information Block
#MNEM.UNIT
STRT.FT
STOP FT
STEP FT
NULL
COMP
WELL
FLD
LOC
CNTY
STAT
SRVC
TOOL
DATE
API
Data Type
9596.0000:
10525.0000:
0.5000:
-999.2500:
COMPANY:
WELL:
FIELD:
LOCATION:
COUNTY:
STATE:
SERVICE COMPANY:
TOOL NAME & TYPE:
LOG DATE:
API NYUMBER:
~Parameter Information Block
$MNEM.UNIT
SECT. 04
TOWN.N lin
RANG. 14E
PDAT. MSL
EPD .F 0
LMF . RKB
FAPD.F 54.30
DMF . KB
EKE .F 54.30
EDF .F N/A
EGL .F N/A
CASE.F N/A
OS1 . DIRECTIONAL
~Remarks
Value
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration, Inc.
K-10A
Prudhoe Bay Unit
2007' SNL, 462' EWL
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Gamma Ray
26-Jun-01
500292176201
Description
...............................
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1) Ail depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data.
(4) Well K-10A was drilled as a sidetrack on Well K-10 from 9596' MD
(8690'SSTVD).
(5) Well K-10A was drilled to TD at 10525' MD (8982' SSTVD).
(6) The interval from 10490' MD (8982' SSTVD) to 10525' MD (8982' SSTVD)
was not logged due to sensor to bit offset.
(7) The data presented is final and has been depth shifted to a PDC
(Primary Depth Control) supplied by BPX (SWS, 27-Jun-2001).
(8) A Magnetic Declination correction of 26.71 degrees has been applied
to the Directional Surveys.
(9) Surface Logging System / Software : CTMWD / DRILLBYTE
(10) Gamma Ray Detector Type: Scintillator.
MNEMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units)
ROPS -> Rate of Penetration, (feet/hour)
TVD -> Subsea True Vertical Depth (SSTVD), (feet)
BOREHOLE NAD ENVIRONMENTAL CORRECTIONS:
GAMMA RAY - Normalized for tool size and sensor type. No correction has been
applied for bit size and mud potassium content.
SENSOR OFFSETS:
RUN GAMF~ DIRECTIONAL
N/A
N/A N/A
CURVE SHIFT DATA
BASELINE MEASURED
9611.53,
9617.85,
9630.76,
9636.85,
9643.62,
9658.59,
9665.32,
9698.28,
9715.99,
9721.85
9731.94
9733.99
9742.35
9749.80
9763.78
9771.75
9794.07
9806.15
9841.65
9862.50
9884.48
9968.50
9979.90
9986.91
10003 5
10036 2
10040 1
10049 1
10058 9
10071 0
9615 42
9622 97
9630 96
9639 30
9647 51
9661 86
9671 25
9701 15
9718 85
9724 92
9738 08
9739 71
9747 87
9755 93
9768 90
9777 88
9799 80
9811 05
9847 78
9866 39
9889 18
9975 46
9986 24
9993 25
10010 0
10041 8
10047 0
10056 3
10066 5
10078 7
EOZ
END
DISPLACEMENT
-3.88477
-5.11328
-0.204102
-2.4541
-3.88477
-3.27246
-5.92969
-2.86328
-2.8623
-3.06738
-6.13574
-5.72656
-5.52148
-6.13477
-5.1123
-6.13477
-5.72656
-4.90723
-6.13477
-3.88574
-4.70312
-6.95312
-6.33984
-6.33984
-6 54395
-5 52148
-6 95312
-7 15723
-7 56641
-7 77148
BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subfile: 1
100 records...
Minimum record length:
Maximum record length:
10 bytes
132 bytes
**** FILE HEADER
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN K-10A
FN Prudhoe Bay Unit
COUN
STAT
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 27-Jun-01.
*** INFORMATION TABLE: CIFO
MArEM CHAN DIMT CNAM ODEP
....................................................
1 GR GRAX10 0 0
2 ROP ROPS10 0 0
3 APR APRESX10 0 0
4 DPR DPRESX10 0 0
5 TCD TCDXl0 0 0
6 WBC WBCX10 0 0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool
Code Samples Units
1 GR MWD 68 1
2 ROP MWD 68 1
3 APR COMP 68 1
4 DPR COMP 68 1
5 TCD COMP 68 1
6 WBC COMP 68 1
API
F/HR
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
.......
24
Total Data Records: 52
Tape File Start Depth = 9596.000000
Tape File End Depth = 10525.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 2
65 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
WDFN mwd.xtf
LCC 150
CN BP Exploration, Inc.
WN K-10A
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
1 GRAX
2 ROPS
3 APRX
4 DPRX
5 TCDX
WBCX
GRAX
ROPS
APRESX
DPRESX
TCDX
WBCX
FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frarae Size is: 28 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Fra~ne spacing: 0.500000
Frame spacing units: [F ]
Nun~er of frames per record is: 36
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
API
F/HR
1 GRAX MWD 68 1
2 ROPS MWD 68 1
3 APRX COMP 68 1
4 DPRX COMP 68 1
5 TCDX COMP 68 1
6 WBCX COMP 68 1
ODEP
..........
00
00
00
00
00
00
Total Data Records: 52
Tape File Start Depth = 9596.000000
Tape File End Depth = 10525.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
FILE TRAILER
Size Length
4 4
4 4
4 4
4 4
4 4
4 4
24
Tape Subfile: 3 65 records...
Minimum record length:
Maximum record length:
**** TAPE TRAILER ****
MWD
01/11/21
155241
01
54 bytes
4124 bytes
**** REEL TRAILER ****
MWD
01/11/22
BHI
01
Tape Subfile: 4
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH GR
TCD WBC
ROP
9596.0000 43.5720
-999.2500 -999.2500
-999.2500
9596.5000 42.6585
174.7980 -7.0824
2062.3877
9600.0000 41.9273
181.4000 0.2083
2084.7793
9700.0000 37.7337
136.4000 1.4352
91.0406
9800.0000 17.8357
138.2000 6.0443
35.6151
9900.0000 23.2838
142.1449 2.4570
85.5709
10000.0000 18.5903
140.0000 2.5081
106.9373
10100.0000 21.9445
141.8000 3.2115
27.8231
10200.0000 19.1253
142.3101 4.1571
54.3900
10300.0000 17.5367
145.4000 1.3488
51.2571
10400.0000 18.9449
143.6000 4.8308
83.1603
10500.0000 -999.2500
145.4000 1.8506
92.6873
10525.0000 -999.2500
-999.2500 -999.2500
-999.2500
APR
-999.2500
3781.9653
3809.1455
4388.0078
4415.6143
4472.3271
4525.7812
4576 5322
4568 9736
4623 7119
4638 8496
4498 2510
-999 2500
DPR
-999.2500
3802.7271
3841.0693
5040.3936
5072.9033
5218.6123
5247.0391
5225.7979
5269.5879
5358.0244
5996.6982
5246.3145
-999.2500
Tape File Start Depth = 9596.000000
Tape File End Depth = 10525.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
TCDX WBCX
9596.0000 -999.2500 -999.2500
-999.2500 -999.2500
9596.5000 -999.2500 -999.2500
-999.2500 -999.2500
9600.0000 43.5720 -999.2500
-999.2500 -999.2500
9700.0000 36.7790 80.8070
136.4000 0.9700
9800.0000 59.8540 42.8340
138.2000 5.2910
9900.0000 21.0830 5.7500
143.6000 -0.0530
10000.0000 20.5760 108.7380
140.0000 2.9830
10100.0000 21.9230 94.1130
141.8000 3.3880
10200.0000 19.3650 72.5470
143.6000 5.5680
10300.0000 17.7390 21.7940
143.6000 3.0140
10400.0000 16.3990 78.1490
143.6000 3.6290
10500.0000 -999.2500 93.7400
145.4000 1.5680
10525.0000 -999.2500 -999.2500
-999.2500 -999.2500
Tape File Start Depth = 9596.000000
Tape File End Depth = 10525.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS
APRX
-999 2500
-999 2500
-999 2500
4388 5820
4421 5361
4470 7051
4523.5547
4563.1924
4584.0010
4620.6924
4611.8115
4506.8203
-999.2500
DPRX
-999.2500
-999.2500
-999 2500
4990 1426
4920 7559
4977 8857
5347 5029
5244 7725
5339 8125
5440 8125
5694 7803
5218.0059
-999.2500