HomeMy WebLinkAbout169-0781a. Well Status:
GINJ
Oil 1b. Well Class:
Exploratory
Service 5
Hilcorp North Slope, LLC
14. Permit to Drill Number/Sundry
169-078
7/21/1969
8/24/1969
GL PRUDHOE BAY, PRUDHOE OIL
4a.
Surface:
Top of Productive Interval:
Total Depth:
Surface: x- y- Zone -628381 5973081 ASP-4
11.
Gas SPLUG 5Abandoned
20AAC 25.105
Suspended
20AAC 25.110
WINJ WAG WDSPL No. of Completions:
6/19/2020
15.
50-029-20042-00-00
16.
PBU M-01
Well Name and Number:
Surface / Surface
27.42
17.
TPI:y- Zone -628161 ASP-4x-5973109
Total Depth: x-y-Zone -628162 ASP-45973118
9397' / 9386'
None
DNR Approval Number:19.
72-015
5. Directional or Inclination Survey:
Yes No
Submit electronic and printed information per 20 AAC 25.050 (ft MSL)
20.Thickness of Permafrost MD/TVD:
DIL / BHCS / GR, PML / ML / MLL, LL3, PDC, SNP / GR, CST
CASING WT. PER
FT.GRADE SETTING DEPTH MD
TOP BOTTOM
HOLE SIZE CEMENTING RECORD AMOUNT
PULLED
Location of Well (Governmental Section):
Field/Pool(s):
Date Comp., Susp., or Aband.:6.
Total Depth (MD/TVD):
CASING, LINER AND CEMENTING RECORD
TOP BOTTOM
22.
SETTING DEPTH TVD
7"
9-5/8"
94#
61#
29#
47#
J-55
N-80
N-80
Surface
Surface
Surface
9366'
4087'
Surface
Surface
Surface 4078'
9355'
8-1/2"
12-1/4"
100 sx Permafrost
720 sx Class 'G', 685 sx Class 'G', 360 sx Class 'G'
600 sx Class 'G', 390 sx Class 'G', 350 sx Fondu
25.
GRADE PACKER SET (MD/TVD)
26.
4-1/2" Thermocase x 8495'
DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED
PRODUCTION TEST27.
Date First Production: Not on Injection N/A
Date of Test:
Flow Tubing
Press
Oil-Bbl:
Oil-Bbl:
Gas-MCF:Water-Bbl:
Oil Gravity - API (corr):
Method of Operation (Flowing, gas lift, etc.):
Gas-Oil Ratio:Choke Size:
Water-Bbl:
8365' - 8370'
Surface
Open to production or injection?Yes No 524.
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
H-40 100'26"20"
13-3/8"Surface 928'17-1/2"1240 sx PermafrostSurface928'
8380' / 8369'
285-bbls Class 'G' Cement
Surface
Tubing Punch
15-gals of Quickcrete
Gas-MCF:
Production for
Test Period
Calculated
24 Hour Rate
Hours Tested:
Casing Press:
100'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
TUBING RECORD
DEPTH SET (MD)
Yes No 5Was hydraulic fracturing used during completion?
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
ADL 028260
320-116
Other
12. SSSV Depth (MD/TVD):
Ref Elevations
BF Surface
(attached)
KB
Form 10-407 Revised 3/2020
Sr Pet Eng Sr Pet Geo Sr Res Eng
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Development
Stratigraphic Test
2.Operator Name:
3.Address:
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
7. Date Spudded:
8. Date TD Reached:
9.
10. Plug Back Depth(MD/TVD):
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
41.23
Water Depth, if Offshore:13.
N/A
Zero
API Number:
Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
23.
18.Property Designation:
21.Re-drill/Lateral Top Window
MD/TVD:
N/A
1642 / 1642
5
Submit within 30 days of Completion, Suspension, or Abandonment
3281' FNL, 458' FEL, Sec. 01, T11N, R12E, UM
3245' FNL, 678: F(L, Sec. 01, T11N, R12E, UM
3237' FNL, 676' FEL, Sec. 01, T11N,R12E, UM
By Samantha Carlisle at 9:31 am, Jul 17, 2020
RBDMS HEW 7/21/2020
Abandonment Date
6/19/2020
HEW
xG
DSR-7/21/2020MGR30JUL2020SFD 7/22/2020
If yes, list intervals and formations tested, briefly summarizing test results. Attach
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Permafrost - Base
Formation at total depth:
Contact Name:Travis Smith
Contact Email: travis.smith@hilcorp.com
Authorized Name:Stan Golis
Authorized Title:Operations Manager
Authorized Signature with Date:Contact Phone:907-564-4696
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
8594'
8632
8708'
8884'
8950'
9200'
9309'
8583'
8621'
8697'
8873'
8939'
9189'
9298'
Sag River
Shublik
Sadlerochit - Zone 4
CGL - Zone 3
Base CGL - Zone 2
Zone 1
Base Sadlerochit - Kavik
Kavik
28.CORE DATA
Conventional Core(s) Yes No 5 Sidewall Cores Yes No 5
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
Well Tested? Yes
9309'9298'
Top of Productive Interval 8708'8697'
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
30. FORMATION TESTS29. GEOLOGIC MARKERS (List all formations and markers encountered):
NAME MD TVD
Permafrost - Top No 5
31. Summary of Daily Work, Photo documentation, Wellbore Schematic DiagramList of Attachments:
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
Digitally signed by Stan Golis
DN: cn=Stan Golis,
ou=Users
Date: 2020.07.17 07:06:18 -
08'00'
Stan Golis
SFD 7/22/2020
9366'
ACTIVITYDATE SUMMARY
5/19/2020
***WELL S/I UPON ARRIVAL*** (plug and abandonment)
RAN 2.30" CENT, 20' x 1.75" DD BAILER, SD HIGH IN TUBING @ 1,469' SLM
(sticks, no sample)
***CONT WSR ON 5/20/20***
5/20/2020
***CONT WSR FROM 5/19/20*** (plug and abandonment)
RAN 10' x 1.75" DD BAILER TO 2,100' SLM (no issues)
ATTEMPTED TO RUN TUBING PUNCH, UNABLE TO PASS 3,412' SLM
CLEAR HYDRATE FROM AT 3,412' SLM - 3,530' SLM
DRIFT TO TOC AT 8,584' SLM W/ 10' x 1.75" DRIVE DOWN BAILER
DRIFT TO 3,340' SLM W/ 2.30" CENT, 20' x 1-3/4" DRIVE DOWN BAILER (Unable
to pass)
DRIFT TO 3,300' SLM W/ 2.25" G-RING (Unable to pass)
DRIFT TO 3,310' SLM W/ 20' x 1-3/4" DRIVE DOWN BAILER (Unable to pass,
hydrates)
MADE 3 RUNS W/ 10' x 1 3/4" DRIVE DOWN BAILER, BAIL FROM 3,290' TO 3,320'
SLM (hydrates)
***CONT WSR ON 5/21/20***
5/21/2020
***JOB CONTINUED FROM 20-MAY-2020*** (Plug & Abandonment)
MADE 2 RUNS W/ 10' x 1.75" DRIVE DOWN BAILER, START FROM 3,324' SLM
TO 3,334' SLM
RAN 10' x 2.0" DUMP BAILER (meth) TO 3,333' SLM
MADE 5 RUNS W/ 10' x 1.75" DRIVE DOWN BAILER, START FROM 3,332' SLM
TO 3,362' SLM
RAN 10' x 2.0" DUMP BAILER (meth) TO 3,361' SLM
MADE 6 RUNS W/ 10' x 1.75" DRIVE DOWN BAILER, START FROM 3,361' SLM
TO 3,398' SLM
RAN 10' x 2.0" DUMP BAILER (meth) TO 3,398' SLM
MADE 1 RUN W/ 10' x 1.75" DRIVE DOWN BAILER, START FROM 3,398' SLM TO
3,400' SLM
***JOB CONTINUED ON 22-MAY-2020***
5/22/2020
***JOB CONTINUED FROM 21-MAY-2020*** (Plug & Abandonment)
MADE 2 RUNS W/ 10' x 1-3/4" PUMP BAILER TO 3,400' SLM, (recovered 3 pieces
of rubber).
MADE 1 RUN W/ 10' x 1-3/4" DRIVE DOWN BAILER TO 3,401' SLM (small amount
of hydrates and 3 small pieces of rubber).
RAN 10' x 2.00" DUMP BAILER (meth) TO, 3,403' SLM.
RAN 10' x 1-3/4" DRIVE DOWN BAILER TO 3,403' SLM (unable to pass, hydrates).
PRESSURE TBG UP TO 1,500psi W/ MEOH
RAN 10' x 1-3/4" DRIVE DOWN BAILER TO 3,308' SLM (hydrates)
RAN 10' x 2.00" DUMP BAILER (meth) TO, 3,308' SLM, ABLE TO WORK TO 3,403'
SLM
***WELL S/I ON DEPARTURE, JOB INCOMPLETE ON 22-MAY-2020***
5/23/2020
T/I/O/OO = 77/17/15/9. RD IA valve, RU Intergal/90/block valve/cap, RD Comp IA
blind, Removed VR plug, RU Intergal/90/block valve/cap. RDMO. ***Job
Complete***.
6/7/2020
CTU #9 - 1.75" Coil x 0.156"wt
Job Objective: Jet Hydrate, Punch Tubing
MIRU CTU. Pump drift ball and perform weekly BOP test.
...Continued on WSR 6-8-20...
Daily Report of Well Operations
PBU M-01
Daily Report of Well Operations
PBU M-01
6/8/2020
CTU #9 - 1.75" Coil x 0.156"wt ***Continued from WSR 6-7-20***
Job Objective: Jet Hydrate, Punch Tubing
Make up Slim 1.75" DJN BHA and RIH. Tag at 3214' and jet hydrates to ~3500'. RIH
and drift out tubing tail. Test tubing to 1800 psi with minimal loss, POOH. MU Drift
BHA and RIH. PT IA to 725 psi before punch to fluid pack IA and confirm no
injectivity. Tag XN, PU and retag, Paint Flag at 8430' and POOH. MU Tubing Punch
BHA and RIH. Correct depth at flag, PUH and punch tubing from 8365-8370'. Confirm
good circulation by pumping 14 bbls of diesel down the IA taking tubing returns and
attempting to balance hydrostatics between IA and tubing. FP tubing with diesel while
POOH. Perform passing CMIT-TxIA to 2500 psi. RDMO CTU
...continued on WSR 6-9-20...
6/9/2020
CTU #9 - 1.75" Coil x 0.156" wt ***Cont. from WSR 6-8-20***
Job Objective: Jet Hydrates, Punch tubing
RDMO CTU.
***Job Complete***
6/9/2020
T/I/O/OO = SSV/0/0/0. Temp = SI. Cement C & B lines (Pre P&A). No AL, flowline
or wellhouse. Rig scaffolding and reverse out skid rigged up. Could not establish
injectivity down the control or balance lines @ ~4000 psi. Bled C & B lines to 0 psi
before departure.
SV, WV, SSV = C. IA = OTG. OA, OOA = Could not reach. 1410.
6/10/2020
Job Scope: Cement Control & Balance lines (P&A)
Able to inject down control and balance lines after LRS circulated the well out.
Flushed control and balance lines with 2.5gal hydraulic fluid each. Pumped 2.5
gallons of D-163 ultra fine squeezecrete at 14 PPG down control line. Pumped 2.5
gallons of D-163 ultra fine squeezecrete at 14 PPG down balance line. SV, SSV = C.
MV = O. IA, OA, OOA = OTG.
***Job Complete***
6/10/2020
SLB Pumping Crew. Cement TBG and IA to surface (P&A)
Cemented TBG and IA from 8,370' to surface by circulating 5bbl freshwater followed
by 285bbl of 15.8ppg Class G cement down the TBG taking returns from the IA.
Clean cement returns after 275bbl away. 100% returns based on returns tank strap.
***Job Complete*** UCA-1000psi compressive strength at 104hr 10min.
TBG and IA BOC = 8,370'
TBG and IA TOC = surface
Daily Report of Well Operations
PBU M-01
6/10/2020
T/I/O=251/258/9 Temp= S/I LRS 72 AOGCC CMIT-TxIA and Circ out (P&A)
(witnessed by Adam Earl)
Pre AOGCC CMIT TxIA PASSED to 2,735/2,728 psi (target= 2,500 psi, max applied=
2,750 psi). Pumped 2.4 bbls of 50/50 down TBG/IA to reach target pressure. First 15
min TBG/IA lost 67/65 psi. Second 15 min TBG/IA lost 26/25 psi for a total loss of
93/90 psi in a 30 min test. Bled back ~2.5 bbls. Heated 290 bbls of 1% KCl in tank
003 to 150*F. AOGCC CMIT-TxIA to 2,500 psi PASSED at 2,647/2,667psi psi (2750
max applied pressure). T/IA lost 61/60 during the first 15min and 26/25 psi during the
second 15 min. T/IA lost a total of 87/85 psi during the 30min test. Pumped 2.9 bbls
of 60* 50/50 Meoh to achieve test pressure. Bled back 2.8 bbls to final T/I/O=
111/120/7. Circulated the well by pumping into the TBG with 1 for 1 IA returns to
OTT. Pumped 75 bbls of 140* F surfactant water and 290 bbls of 140* F 1% KCl
water. Final T/I/O= 7/10/6. Operator notified of status upon departure. SV, SSV, WV
are closed. MV is open. IA/OA are OTG. Heated UR #84 of brine to 140* F.
***Job Complete***
6/13/2020
T/I/O = ?/0/0/0. Temp = SI. PT C & B lines (P&A). No wellhouse, flowline,
scaffolding or AL. Upper tree has been removed. IA has integrals with 1502 caps, no
IA valve. Balance line PT passed to 3700 psi. Control line PT passed to 3800 psi.
Master valve wheel has been removed and valve could not be turned with a wrench.
MV = ?. IA = OTG. OA, OOA = ? (Could not reach). 1200.
6/13/2020
T/I/O=0/0/0 R/D upper tree, installed tree cap bonnet onto Master valve. Torqued to
specs. Installed 1502 caps onto integrals on IA. FWP's 0/0/0 see log for details.
6/19/2020
M-01 P&A: Excavate from pad grade down 13.0', Installed shoring system. Cut
wellhead 11.0' below pad grade. Found Voids in OOA (1.0'), OA (2.1'), IA (11.0'), and
Tubing (6.0') AOGCC Matt Herrera inspected prior to topping off strings. Top off all
strings with 15 gallons of Quickcrete. AOGCC Guy Cook witnessed marker plate
installation. All final depths are: Pad grade 26.2', Tundra grade 19.2' Wellhead cut =
15.2'. Wellhead is cut and abandoned 4.0' below tundra grade. Pull shoring box and
backfill excavation with gravel. ***Job Complete***
MEMORANDUM
TO: Jim Regg�
P. I. Supervisor
FROM: Matt Herrera
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
('fuO(t`rI1DATE: 6/19/2020
SUBJECT: Surface Abandon
PBU M-01
BPXA _
PTD 1690780; Sundry 320-116
6/18/2020: Traveled out to PBU M -Pad and met up with BP Field Rep John Perl and
went overwork scope on the P&A of PBU M-01 per Sundry 320-116. They had the
excavation complete and all casings cut. Verified well casings cut below original tundra
grade per regulation. Marker plate information was correct per sundry and PTD. Verified
cement voids on casing strings to bring to surface. Estimated combined 10 gallons to
top off all casing strings. When cementing complete they will wait for cement to cure
and confirm set up solid prior to welding marker plate onto well.
Attachments: Photos (4)
2020-0618_Surface_Abandon_PBU_M-0l rah.docx
Pagel of 3
Surface Abandon — PBU M-01 (PTD 1690780)
Photos by AOGCC Inspector M. Herrera
6/18/2020
� .. '. ,, b iii♦ •^a �
a e1z
*. �:� e ba •y�sg Y
r
2020-0618_Surface_Abandon_PBU_M-01 mh.docx
Page 2 of 3
u
E
� vw 14
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg ll �(��I DATE: 6/19/2020
P. I. Supervisor
FROM: Guy Cook SUBJECT: Surface Abandon
Petroleum Inspector PBU M-01 -
BPXA _
PTD 1690780; Sundry 320-116
6/19/2020: 1 arrived on site and met with John Perl with BPXA. We discussed the well
and I went to the wellhead to confirm cut-off depth and to check the information on the ✓
identification plate. All the information on the identification plate was correct except the
well name was missing the PBU in front of M-01. This was easily fixed. The casing
was confirmed to be cut off at 4 feet below tundra level.
I waited on-site for the identification plate to be installed and witnessed the install. The
welds appeared to be good solid welds that had good penetration. The wellbore v
appeared to be sealed off from the environment so I gave the go ahead to bury the well.
Attachments: Photos (4)
2020-0619_Surface_Abandon_PBU_M-01 _gc. docx
Page 1 of 3
r.•
r ct
k. -e �rR
I
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg
P.I. Supervisor Z-�14 bjqZ�
FROM: Adam Earl
Petroleum Inspector
Section:
Drilling Rig:
Operator Rep:
1 1 Township:
N/A Rig Elevation:
Eric Dickerman
Casing/Tubing Data (depths are MD)
Conductor:
20"
. O.D.
Shoe@
Surface:
13 3/8"
- O.D.
Shoe@
Intermediate:
9 5/8"
• O.D.
Shoe@
Production:
7"
O.D.
Shoe@
Liner:
O.D.
Shoe@
Tubing: 4 1/2" x 2 7/8" O.D. T. tail@
Plugging Data:
Test Data:
DATE: June 10, 2020
SUBJECT: Plug Verification
PBU-M-01
BPXA
PTD 1690780; Sundry 320-116
11N Range: 12E Meridian: Umiat
N/A Total Depth: 9397 ft MD " Lease No.: ADL028260
Suspend: P&A: x
100
Feet
928
Feet
4087
Feet
9366
Feet
Csg Cut@
Feet
8496
Feet
Type Plug
Casing Removal:
Csg Cut@
na Feet
Csg Cut@
na Feet
Csg Cut@
na Feet
Csg Cut@
na Feet
Csg Cut@
Feet
Tbg Cut@
na Feet
Type Plug
Founded on
Depth Btm
Depth To
MW Above
Verified
Fullbore
I Bridge plug
8945 ft MD "
8577 ftMD '
15.8 ppg
Wireline tag
9
8 -
Initial 15 min 30 min 45 min Result
Tubing
2734 -
2673 -
2647
IA
2752 -
2692 -
2667 -
P
OA
11
9
8 -
Initial 15 min 30 min 45 min Result
Tubing
IA
OA
Remarks:
I traveled out to PBU M-01 to witness a Combo pressure test: Tubing and IA. Well was suspended in October 2018; plug tag
witnessed by AOGCC Inspector M. Herrera on 10/1/2018. Test was post tubing punch prior to pumping P&A cement. Test went
as shown in chart above.
Attachments: none
rev. 11-28-18 2020-0610_PI ug_Verification_PBU_M-01 _ae
THE STATE
0ALASKA
GOVERNOR MIKE DUNLEAVY
Beau Obrigewitch
Well Integrity Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Oil Pool, PBU M-01
Permit to Drill Number: 169-078
Sundry Number: 320-116
Dear Mr. Obrigewitch:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
ww W. a og c c.a I aska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
4w
Daniel T. Seamount, Jr.
Commissioner d
r
DATED this Z 3 day of March, 2020.
"
'DMS- ri 1010
STATE OF ALASKA RECEIVED
`®ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
1. Type of Request: Abandon 0 D Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ MARO e ti tdown ❑
Suspen0 Perforate CehaOgg ADD gram O
Plug for Rednldl ❑ Perforate New Pool ❑ Re-enter SuspuWellll ❑ Altelr Casing ng 0 01
0ll N1U lr
2. Operator Name: BP Exploration (Alaska), Inc
4. Current Well Class
Exploratory ❑ Development ❑
69-078 `
5. Permit to Drill Number: 169-078
3. Address: P.O. Box 196612 Anchorage, AK
99519-6612
Stratigraphic ❑ Service 0'
6. API Number. 50-029-20042-00-00
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes ❑ No 0
PBU M-01 r
9. Property Designation (Lease Number):
10. Field/Pools:
ADL 028250
PRUDHOE BAY, PRUDHOE OIL
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft):
Total Depth TVD(fty Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
9397
9386 8600 8589 8600.8945.9040 None
Casing
Length Size MD TVD Burst Collapse
Structural
Conductor
80 20" 20-100 20-100 1530 520
Surface
909 13-3/8" 20-928 20-928 3090 1540
Intermediate
4070 9-5/8" 18-4087 1 18-4078 1 6870 4760
Production
9351 7" 16-9366 16-9355 8160 7020
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
1
Tubing Grade:
1
Tubing MD (ft):
1
8710- 9060
8E
4-1/2" Thermocase x 2-7/8" 6
N-80
14-8495
Packers and SSSV Type: 2-7/8" Baker FB -1 PERM PKR
Packers and SSSV MD (ft) and TVD (ft): 8380/8369
No SSSV Installed
No SSSV Installed
12. Attachments: Proposal Summary 0 Wellbore Schematic 0
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development ❑ Service 0
14. Estimated Date for Commencing Operations: April 15, 2020
15. Well Status after proposed work:
Oil ❑ WINJ ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Date:
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned 0
17. I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Obngewitch, Beau
be deviated from without prior written approval.
Contact Email: BEAU.OBRIGEWITCH0bp.com
Authonzed Name: Obrigewitch, Beau Contact Phone: +1 907 564 4854
Authorized Title: ell lntegnt Engineer
Authonzed Signature: Date''7�. / h I-Zl)
Gb
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number.
�D
Mechanical
Test ❑
Plug Integnty ❑ �//1 I1\W/egrity Test LYS LLlo pion Clearance
+_O
Other. A K.O C-10 We.wBOP
( 40 k-� Cie5'C.i 'J EJB L\6e
3BDMS 1 --/APR 0 7 2020
Post Initial Injection MIT Req'd? Yes ❑ No❑ /
Spacing Exception Required? Yes ❑ No r� Subsequent Form Required: 10 —y c 7
APPROVED BYTHE
:3 A:5/mc)
ApprovedbZ&��� COMMISSIONER COMMISSION Dale J////
S�` bl 3 2u2°
ORIGINAL Submit Form and
Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval.�� � Attachments in Duplicate
fr 1W _26lao
M-01 Full Plug and Abandon
Intervention Engineer
Beau Obrigewitch (907) 564-4854
Production Engineer
Bernhard Stechauner (907) 564-4594
Expected start date:
April 15, 2020
History
M-01 was completed with a multi -string casing design in 1969. The outercasing .-triset in
permafrost. GWO has determined wells of this construction are at risk for sudden wellhead movement,
as emons ated by 02-03A and 02-02A. As such, the AOGCC has requested this well be plugged and
abandoned to mitigate HSE consequence associated with this potential risk. As part of a previous risk -
reduction effort, the reservoir was permanently abandoned under approved Sundry 318-222, with TOC
tagged at 8,577' SLM and a passing MIT -T to 2,562 psi.
Objective
Complete Plug and Abandonment by placing cement plug in the wellbore. Excavate and cut
casings 3' below original tundra level and install marker cap.
This P&A program is designed to conform to BP Practice 100221: Zonal Isolation and BP Alaska's
deviations captured in eMOC 10439.
Job Steps
1
J
a. Cement Control/Balance Lines
b. WOC 3 Days: Pressure test C/B Line Cement
2
V
Drop IA valves and install integrals
3
S
a. Punch Tbg at —8,370'
b. Verify Tbg to IA Circulation
c. Integrity Test - TxIA
4
F
Assist Slickline:
a. Verify Tbg to IA Circulation
b. Integrity Test - TxIA
5
J
a. Surfactant Wash IA and Tbg
b. Circ well to 9.8 ppg brine
6
J
Cement Tbg and IA Surface to Surface
7
rp7Notification
J
Excavate, cut off Wellhead, and Install Marker Plate; Requires AOGCC Witness
Procedural steps
Special Projects
1. Cement control and balance line w/ 1.2 gals of squeezecrete or finecem (1,300'). Reference small
volume cement RP. If pump pressures allow (<5,000 psi), pump the entire line volume of cement (Lines
are 1,060ft/gal; total displacement to 2,100' MD is 2 gallons per line).
DHD
2. Wait on cement 3 days and pressure test control and balance lines to 2,500 psi per Small Volume MIT
criteria in MIT RP.
Valve Shop — This Step Can be Omitted at WSL Discretion
3. Drop IA gate valves and install integral valves.
Note: The OA and OOA are already cemented to surface so no cementing (except for a potential top
job post -cut) will be needed on these annuli. As such, they do not need to have the valves changed.
Slickline / Fullbore
4. Punch 2-7/8" tubing just above the packer, at 8,370' MD, use TEL for depth control. Use 5' tubing
punch as recommended by tubing punch supplier and verified by WSL.
5. Verify Tbg x IA Circulation: Pump a small volume (2-3 bbls) of non -freezable fluid down tubing, taking
returns from IA. The opposite direction can be chosen at WSL discretion. Ensure well is freeze
protected at surface and through permafrost interval.
Note: The tubing has 2,600' 50/50 McOH Freeze Protect (see WSR dtd 9/18/18), and the IA fluid is
unverified, but is assumed to have —800' diesel over 9.8 ppg brine, based on drilling records and well
reports from the time the current completion was run in 1979.
6. Combo Integrity Test -TxIA with any non -freezable fluid to 2,500 psi: Verify pressure stabilization for 10
minutes. If >10% falloff in 10 minutes, repressurize and perform 30 -minute CMIT-TxIA.
Note: This pressureest is to verify we ave hard bgttom; MIT RP criteria only apply as noted.
— ZLl � v— UW tr, e e—. S�-dI-e'-o "I--n.esS
Hold Point: If CMIT-TxIA fails, contact Beau Obrigewitch at (907) 564-4854 (o) or (907) 952-6271 (c).
Fullbore / Special Projects
7. Surfactant Wash IA and Tubing; Circ to 9.8 ppg Brine; Pump at max rate down Tubing and up IA per the
following pump schedule:
• 75 bbls hot surfactant wash (180°F FW + 2 gal/mgal of F103 and 2 gal/mgal of U067)
• 270 bbls brine* to flush the surfactant wash.
* Any brine is suitable if proceeding immediately to cement after flush. If cementing is not
commenced immediately, pump 9.8 ppg brine. 9.8 ppg brine is freeze protected to -5°F. U-tube
some methanol to prevent ice plugs at surface.
Note: The calculated volume is 270 bbls. Pump additional as needed to confirm a good sweep.
Verification of a good sweep is accomplished by one of the following two methods, at WSL discretion:
• Rig up to take returns through a micro -motion to check density
• Lead with an appropriately -sized pill (-10-20 bbls) of dyed brine
Volume Calculations — 9.8 Circ and Cement Plug
7" x 2-7/8" volume from 8,370' MD to 2,038' MD 0.0291 bpq
185
7" x 4-1/2" volume from 2,038' MD to Surface 0.0175 b
36
2-7/8" volume from 8,370' MD to Surface 0.00579 b
49
aBbIs
Total Cased Hole Ca acit See details for excess to um
270
Cement Volume with Tb & IA at Surf See details for excess
270
Fullbore / Special Projects
8. Circulate cement down the tubing, taking returns from the IA, cementing both the IA and Tubing from
8,370' to Surface, at max rate or 2,500 psi per the following pump schedule.
5 bbls neat Meth or 60/40, at WSL discretion
• 5 bbl FW spacer
• 280 bbls Class G cement per design
9. Cement returns should be at surface @ -270 total bbls pumped. Continue pumping cement until full
planned volume of 280 bbls (should return 10 bbls clean cement).
10. At WSL discretion, inject a small amount of N2 across the wellhead in an attempt to remove some
cement, increasing the chance of opening the valves and providing a monitorable space to check for
pressure prior to cutting the wellhead off.
Recording Requirements: Note the recording requirements in RP: Through -Tubing Abandonment,
Section 5.9.
Cement Design - Cement Plug: Mix on the Flv
Cement Type / Weight
Class G 15.8 ppg mixed on the fly
Field blend to by equal to lab +/- 0.1 ppg
Slurry Tempera ure
800 to 110° F
Fluid Loss
40-200cc 20-100 cc / 30 min
Compressive Strength
2000 psi in 48 hrs
Thickening Time
Minimum 4 hours
Cement Thickening Time
Activity
Time hours
Shearing time, quality control, PJSM
0
Cement displacement -270 bbls Q 5 bpm)
1
Safety
3
Minimum required thickening time:
4
DHD
11. Bleed tubing and IA pressures and monitor after a minimum of 24 hours.
Special Projects
12. Excavate and Cut off all casings and wellhead 3' below original tundra level. Top job all annuli and
tubulars with cement as needed. Install marker cap on outermost casing string. Provide a minimum of
24 hours notice to AOGCC Inspector of the timing of the cut. Photo document the condition of the
tubular stub immediately after cutting the ellhea after topping off with cement (i necessary,), and
after installing the marker plate. � "� �GV 'VL k �� 10 S� C
• Marker Plate to meet requirements in SOP: Through -Tubing Abandoment, Section 5.8:
i. Minimum %d' Thick
ii. Minimum 18" Diameter
• Bead weld to the marker plate the following information:
BP Exploration Alaska, Inc.
PTD: 169-078
Well: PBU M-01
API: 50-029-20042-00
Check Off P&A Deviation Assessment
Date:
Engineer:
Well
Name:
3/10/2020
Beau Obrigewitch
M-01
The region will complete a verification on the individual wells to determine if they fall within the stated
boundary conditions.
If a well falls outside of the boundary due to particular downhole conditions, this will typically be handled
by the engineer seeking email approval for a scope change to this deviation from the Zonal Isolation SETA
or Area Wells Engineering Authority. In cases where the scope change results in a significant increase in
risk as determined by the Zonal Isolation SETA or Area Wells Engineering Authority, the well shall have a
specific deviation and eMOC performed.
Reservoir Plug
Fx-] a) No evidence of sustained casing pressure on the OA or OOA from DPZ3 and/or DPZ4.
X b) Tag top of cement in tubing to verify placement, and pressure test where possible.
Intermediate Plug
X a) If DPZ2 is not present; a minimum of 200 ft MD lateral barrier between DPZ3/DPZ4 and DPZ1.
b) If DPZ2 is present; a minimum of 200 ft MD lateral barrier between DPZ3/DPZ4 and DPZ2. A
N/A minimum of 200 ft MD lateral barrier above DPZ2.
N/A c) Tag top of cement inside tubing, and pressure test. Negative pressure test when DPZ2 is present.
Surface Plug
X
a)
Control line and/or chemical injection line has injectivity to place cement slurry.
X
b)
Tubing, IA and OA cemented from surface a minimum of 1300 ft MD to form lateral barrier to DPZ1.
c)
Where possible place a lateral barrier at least 200 ft MD in length below the end of the control line
X
and above the surface casing shoe.
d)
Where possible cement the entire OA from surface to surface casing shoe. This is typically done by
X
doing an OA down squeeze or punching tubing and circulating up the wellbore.
Risk Level
a)
There are no well integrity issues that would increase the risk level determined in the Risk
X
Assessment and standard well abandonment protocol.
lREa= 6'CW/ 5000 FSI
NB.LF@1.D=
FMC
ACRIATOR=
DIS
OKB. ELEY =
4123'
BF. ELEV=
Max Angle =
2529'
7.5 0 2400'
Depen MD=—.—
8'857
Dek"TYD=
8600'55
SUSPENDE
H-40,
19.124
7" Bowen Csg Patch 1,922'
Top 9-5/8" Cement (est) 2,060'
Minimum ID =2.205" @ 8482'
2-778' OTIS XN NIPPLE
Top 7" Cement {est) 6,587' I I
PERFORATION SUMMARY
REF LOO. BNCS/GR ON 08724189
ANGLE AT TOP PERF; 1 0 $710'
1-11116^
4
8130-8750
S
09/18118
,•
4
ers6-e/60
5
aW16na
1.11116'
4
6168.8766
S
NI1W18
2•
4
8766-8794
S
09/1W18
1•IIA61
4
8794-8892
S
091&,116
2'
4
9055-9066
5
09118!18
7'
4
8444-4(411
S
O411W18 1
2•
4
- 8966-8962
S
OW18118
21
8
i 8822 Beer
S
OW15d18
2'
4
8804.8618
5
aW16/18
1-1116•
4
8994-9008_-_,-
S
WWII
FBTO 926$' —
7" CSG, 29k. 1.86, D-6.184'
9897'
1,612' 9-5/8" DV Collar
Top DPZ 1/BPRF — 31295'
Base DPZ 1— 5,419'
6341' 2.7/8' OTIS SLUM SLEEVE D - 2.119'
��,j_ _8S8b' BTM CI:'BfAl A68Y
8361!• 7^ x dam^
RA KM FR -1 PKR
Top DPZ 3 — 8,,5[94'
6946' r 61<ex;l. 111x;
Base DPZ 3 — 9,309'
DATE REV BY COMMENTS
DAIS REV BY COMMENTS
0&r"69 OR61NAL COMPLETION
0227101 S" CONVERTEDTOCANVAS
03/14101 SO4M FINAL
10f1711B t JMJJMD ,ADDEDKB&BFELEV
D&2V79 JMJJMD ADDED GOND&SUSPENDED
027172D BOfJAA� REFORMATTED WSS
1Ir0J11 R1W P CORRECTIONS
_ _ -_
03N7MO JMMLIMO OORREc1EDxN NPD
0MMS JCF7JMO CEMENT P&IV50,2P ,tF9
PRUDHOE BAY UNIT
WELL: M-01
PER Aff W //1690780
APINo. 50429-20042-00
BP Embwlion (Make)
MEE= B• CNV/ 5000 PSI
WB.LWAD=
FMC
TU
ACATOR=
-- ODS
Ol®. ELEV =
412T
4
2529'
ICt7P=
Mss Angle =
4400'
7- 02400'
n*mMD=
8852'
DU MTVD=
sew SS
2(r Cow, too'
94#, H-40,
D=19.124"
19-918• CSG, 81#,155, D=12.515' 828' i--
7" Bowen Csg Patch 1,922'
Top 9-5/8" Cement (est) 2,060'
9 -WW CSG. 470, N410. D - 6.661' 4087'
Top 7" Cement (est) 6,587
Minimum ID = 2.206" @ 8462'
2-78' OTIS XN NIPPLE
1—
Tbg Punch -8,370'
PERFORATION SUMMARY
RCF LOG: SHCSW ON 0812489
ANGLE AT TOP PERF:1 CD 871 D'
1-11.16"
4
8730 8750
S
09)18/18
2'
4
8/50-8760
S
C911RI18
1.1116.
4
8760.8766
5
09118118'.
2-
4
8166-8194
S
091W18
111!16"
4
8794 8832
S
0911&18
2'
4
9655-9066
S
MIBJIB 'I
9'
4
8994 .9008
5
0AH811R
2
4
8988-0982
S
09/1&118
2'
8
8822 8881
_,
09i18l18
2'
4
8804-8818
5
09118718 '
1-11118'
4
8984 90M
S
09/19118
Pim9288'
1.6.184• 939T
1 1,612' 9-5/8" DV Collar I
Top DPZ 1/BPRF — 30295'
Base DPZ 1— 51419'
OTB SLDING SLt4-V E D = 2.313•
Top DPZ 3 — 8,594'
8946' -{7• BRDCE PI tX.
V15&0' �:!' IViYV=:1 111e:
Base DPZ 3 — 9,309'
DATE REV BY COMMENTS
DATE
REV BY COMMENTS
0873059 _ OPGNAL COMPLETION
M7A1 S/Slsl CONVERTED TO CANVAS
10117118
0&21/19
JNUJMO ADDED KB 6 BF ELEV
JNLlJMO ADDED COW & SUSPENDED
031"1 SO4AD FINAL
027/7/20
BWJMD REFORMATTED TABS
11/22/01 RWTP CORRECTIONS
03/'17/16 JMMUMO CORRECTED XN W 1)
Da2D1'16 JCHJMD CEMENT P&%SQZ PERFS
PRUGHOE BAY UNIT
WELL: M-01
PERMIT N9: 16W78D
AN No: 5042020042-00
BP Expbmbm (Al wk%)
ii
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Aker Casing ❑ Change Approved Program ❑
Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Suspend Inspection m
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development ❑ Exploratory ❑
5. Perini[ to Drill Number: 169-078
3. Address: P.O. Box 196612 Anchorage,
AK 99519-6612
Stratigraphic ❑ Service®
1 6. API Number: 50-029-20042-00-00
7. Property Designation (Lease Number): ADL 028260
8. Well Name and Number: PBU M-01
9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY. PRUDHOE OIL
11. Present Well Condition Summary: REOEI
Total Depth: measured 9397 feet Plugs measured 8600, 8945, 9040 feet
true vertical 9386 feet Junk measured None feet JUN 26 2019
Effective Depth: measured 8600 feet Packer measured 8380 feet
true vertical 8589 feet Packer true vertical 8369 feet eOGCC
Casing: Length: Size: MD: TVD: Buret: Collapse:
Structural
Conductor 80 20" 20-100 20-100 1530 520
Surface 809 13-3/8" 20-928 20-928 3090 1540
Intermediate 4070 9-5/8" 18-4087 18-4078 6870 4760
Production 9351 T' 16-9366 16-9355 8160 7020
Liner
Perforation Depth: Measured depth: None feet
True vertical depth: feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" Thermocase x 2-7/8" 6.5# N-80 2038-8495 2038-8485
Packers and SSSV (type, measured and 2-7/8" Baker FS -1 PERM PKR 8380 8369
true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation
Suspended
Subsequent to operation:
14. Attachments: (required per 20 MC 25.07025,1371. & 25283)
15. Well Class after work'.
Daily Report of Well Operations 0
Exploratory ❑ Development ❑ Service R1 Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ 1
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP 0 SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best Of my knowledge. Sundry Number or N/A if C.O. Exempt:
WA
Authorized Name: Lastufka, Joseph N Contact Name: MontgomeryTravis J
Authorized Title: SIS ialist Contact Email: Travis.Montgomery($bp.com
Authorized Signature: ate:�1%iQr(� Contact Phone: +1 907 564 4127
Form 10-404 Revised 04/2017 L� h4R�i�jTiretj`� gpMS UN 2 8 2019 Submit Original Only
A
Daily Report of Well Operations
M-01
ACTIVITYDATF RI IMMGRV
T/110/00 = 0+/60/10/10. Temp = SI. Pre -Suspended Well Inspection. No flowlines or
wellhouse. Cattle guard installed around well with proper sign designating well on it.
Plywood and yellow rig mat over cellar. Cellar is full of snow, unable to see valve
5/30/2019
positions.
T/1/0/00 = 0/60/10/10. Temp = Sl. AOGCC SU Inspection (Regulatory Compliance). State
witnessed by Adam Earl. Pictures taken.
6/2/2019
ISV, WV = C. IA, OA = OTG. 12:00
Suspended Well Site Inspection Form Initial Inspection
Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness
Well Name: M-01 Field/Pool: Prudhoe Bay / Prudhoe Oil
Permit # (PTD): 1690780 API Number: 50-029-20042-00
Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 10/1/2018
Surface Location: Section: 1 Twsp: 11N Range: 12E
Nearest active pad or road: M Pad
Take to Location
Digital camera
Brief well history
Latest Sundry or Completion report
Past Site Visit documentation
Pressure gauges, fittings, tools
Map showing well location /Aerial photos
Wellbore diagram showing downhole condition
Site clearance documentation
Sample containers for fluids on or near pad
Condition of Surface Location AOGCC requires:
1) a description of the condition of the surface location, including discoloration, fluids or sheens visible
on the ground or in any nearby water,
2) photographs showing the condition of the location surrounding the well
General location condition: Clean
Had or location surface:
Location cleanup needed:
Pits condition:
Surrounding area conditic
Water/fluids on pad:
Discoloration, Sheens on
Samples taken: None
�Uw.c luau w11UILIWL
Photographs taken (# and
Condition of Wellhead AOGCC requires:
1) a description of the condition of the wellhead, 2) well pressure readings, where practicable,
3) photographs showing the wellhead condition
Wellhead/tree/valve description, condition: Clean
Cellar description, condition, fluids: None
Rat Hole: N/A
Wellhouse or protective barriers: Cattle Guard
Well identification sign: Yes
Tubing Pressure (or casing if no tubing): SSV
Annulus pressures: 50/50
Wellhead Photos taken (# and description): Yes
Work Required: None
Operator Rep (name and signature): Josh Prowant
AOGCC Inspector: Adam Earl Other servers:
Inspection Date: 6/2/2019 AOGCC Notice Date: 6/1/2019
Time of arrival: 11:40 AM Time of Departure: 11:50 AM
Site access method: Access Road
Y
a'
9
/ q F WELL: M-01 �s
OWNEF Prudhoe Bay Unit .._ .l -
;n.
OPEat.tOR BP Eaplorel on (Alaska) Inc E
PPI NUMBER 60 -029 -200A2 -Ib -00
SUR. LOCATION SE VA. Sec. 01 TTIK R12E
mlm PERI 169-010
I
N
r
�
,I
;
•3 �A �. fTs
~
X4.1. A.
li.
- 2 'ti• 'Y
I
N
r
E
or,
Om
11 1 �Awvm
Ot
R-41 S -14A -1
—S-37 5-05APBS1� hN 56 — h,Nq R}30 J hFd4 t R -15A f- 21 R-$iLi
�R-09
7 S -1t3 --}}
5-} 3P• 31 — R-02 R-4
S-o.?APBs 5-05A hF26 AM -20A R40FE 1t' _
OVhK00A �- DR 29 II -
U05 C'R28A—IP.-1_ {1
_ 5-11 ! h125A h 20.AP81 1+ R -35A
PA 20
'6h $-37T 11A —rr
P,1-19• h• -IIA 6 R -29Z R-14 R-28
R'11A
C j '�R-17H?61
- • ! IP1'30 r. h431 '...I R-14AC R-39AL1
Rin 1
I 11-1 14- 16 R-39AL1PB7
P 9-
'3.S-126 41-13 ) _M-21 R-24
5-40 IeF 32
-13 . # P's. 86 hF 12A
!.lul-4
- _ A,41 JI h421.A '- R-11
�` hFD3A —
10(-1 i a hFit
S D 5.
- $.p hF 3AP81 i'�,1-28 hK24A R-07 I ,�
f t N" i
hi -33
L: K24
:J427 F h R,1
� hF38 -
44-
.1, -Jt m109A r 23-U-05
' 14-23A P
w25
+r B D 4-17
A hR29A - N-18
M-02` - " W25 N-13
LF02PB1
U- 12A hl -08A 7 %408 +!
M1,1-05APB2 12 A IOSAP 2- M-08AP81
hLD5APB1
L M-17 M-08 �
01
- r4- 11- I
U-02APB1 N -10A _-_
TRff=• 6"CIW/5000 PSI
VVRLHEAD=
RMC
ACTUATOR=
OT6
0103. B -LV =
4123'
BF. ELW =
2529'
XOP=
2400'
Max Angle =
7.5 @ 2400'
Datum MD=
8852
DatumTVD=
8800'SS
SUSPENDED M-01 SAFETY NOTES:
DATE
REV BY I COMMENTS
DATE
REV BY COMMENTS
08/30/69
ORIGINAL COMPLERON
10/17/18
JNL/AV ADD®103 8 BF EEV
0227/01
S6kI CONVETTE)TOCANVAS
06/21/19
-JN ADDED CONDBSUSPENDED
03/14/01
SIS -MD FINAL
1122101
RWTP CORRECRONB
03/17/16 JMM/JMD CORRECTED XN NPD
0920/18
JCF/JMD CEMENT F&A/SOZ PE;r
PRUDHOE BAY UNI!
WELL: M-01
PERMIT No: 9690780
API No: 50-02920042-00
SEr- 1, T11 N, R12E 1999' NSL 8 458' WEL
BP Bq)bration (Alaska(
STATE OF ALASKA
WELCALASKA OIL AND GAS CONSERVATION COMN
OMPLETION OR RECOMPLETION REP AND LOG
1a. Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 0
1b. Well Class:
20AAC 25.105 20AAC 25.110`
GINJ ❑ WINJ 11 WAG ❑ WDSPL ❑ No. of Completions: Zero
f'
Development�ra�J.=
Service 0 Stratigraphlc Test ❑
2. Operator Name:
6. Date Comp., Susp., or Aband.:
14. Permit to Drill Number/Sundry
1169-078
BP Exploration (Alaska), Inc
10/1/2018
318-222
3. Address:
7. Date Spudded:
15. API Number:
P.O. Box 196612 Anchorage, AK 99519-6612
7/21/1969
50-029-20042-00-00
4a. Location of Well (Governmental Section):
8. Date TD Reached:
16. Well Name and Number:
8/24/1969
PBU M-01
9 Ref Elevations KB 41.23
17. Field/Pool(s):
Surface: 3281' FNL, 458' FEL, Sec. 01, T1 1N, R12E, UM
Top of Productive Interval: 3245' FNL, 678' FWL, Sec. 01, T11N ,R12E, UM
GL 27.42 BF 25.29
PRUDHOE BAY, PRUDHOE OIL
10. Plug Back Depth(MD/TVD):
18. Property Designation:
Total Depth: 3237' FNL, 676' FEL, Sec. 01, T1 1N, R12E, UM
8600'/ 8589'
ADL 028260
4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27):
11. Total Depth (MD/TVD):
19. DNR Approval Number:
Surface: x- 628381 y- 5973081 Zone - ASP 4
9397'/ 9386'
72-015
12. SSSV Depth (MD/TVD):
20 Thickness of Permafrost MDfTVD:
TPI: x- 628161 y- 5973109 Zone - ASP 4
Total Depth: x- 628162 y- 5973118 Zone - ASP 4
None
1642'/ 1642'
5. Directional or Inclination Survey: Yes ❑ (attached) No 0
13. Water Depth, if Offshore:
21. Re-drill/Lateral Top VVindow
MD/TVD:
Submit electronic and printed information per 20 AAC 25.050
N/A (ft MSL)
N/A
22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper,
resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record.
Acronyms may be used. Attach a separate page if necessary
DIL / BHCS / GR, PML / ML / MILL, LL3, PDC, SNP / GR, CST
23' CASING, LINER AND CEMENTING RECORD
CASING
Wf, PER
FT.
GRADE
SETTING DEPTH MD
SETTING DEPTH TVD
HOLE SIZE
CEMENTING RECORD
AMOUNT
PULLED
TOP BOTTOM
TOP
BOTTOM
P0'.
94#
H-40
20' 100'
20'
100'
26"
108 sx Permafrost
13-3/8"
61#
J-55
20' 928'
20'
928'
17-1/2"
1240 sx Permafrost
7„
29#
N-80
16' 9366'
16'
9355'
12-1/4"
720 sx Class'G', 685 sx Class'G', 360 sx Class'G'
9-5/8"
47#
N-80
18' 4087'
18'
4078'
8-1/2"
600 sx Class'G', 390 sx Class'G', 350 sx Fondu
24. Open to production or injection? Yes ❑ No 0
25. TUBING RECORD
If Yes, list each interval open (MD/'TVD of Top and Bottom; Perforation
GRADE DEPTH SET (MD) PACKER SET (MD/TV
Size and Number; Date Perfd):
4-1/2" Thermocase 8495' 8380'/ 8369'
x 2-7/8" 6.5# N-80
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
%��srp� Nov I �
����11 �
Was hydraulic fracturing used during completion? Yes ❑ No 0
Per 20 AAC 25.283 (i)(2) attach electronic and printed
information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
8600' 17 Bbls Class'G'
27, PRODUCTION TEST
Date First Production: Not on Injection
Method of Operation (Flowing, gas lift, etc.): N/A
Date of Test:
Hours Tested:
Production for
Oil -Bbl
Gas -MCF:
Water -Bbl:
choke Size:
Gas -Oil Ratio:
Test Period �►
Flow Tubing
Casing Press:
Calculated
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Oil Gravity - API (corr):
Press
24 Hour Rate
Form 10-407 Revised 5/2017 CONTINUED ON PAGE 2 Submit ORIGINAL only
$.� $. a/13 �(��� VTC I//$/l RDDMS Wf GCT 2 2018 ��
28. CORE DATA Conventional Core(s) Yes ❑ No D Sidewall Cores Yes ❑ No Q
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Permafrost - Top
Well Tested? Yes ❑ No D
Permafrost - Base
If yes, list intervals and formations tested, briefly summarizing test results. Attach
Top of Productive Interval
8708'
5697
separate sheets to this form, if needed, and submit detailed test information per 20
AAC 25.071.
Sag River
8594'
8583'
Shublik
8632'
8621'
Sadlerochit - Zone 4
8708'
8697'
CGL - Zone 3
8884'
8873'
Base CGL - Zone 2
8950'
8939'
Zone 1
9200'
9189'
Base Sadlerochit - Kavik
9309'
9P98'
Formation at total depth:
Kavik
9309'
9298'
31. List of Attachments: Summary of Daily Work, Wellbore Schematic Diagram
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Lastufka, Joseph N Contact Name: Obrigewitch, Beau
Authorized Title: Fizvecialist Ar A Contact Email: BEAU.OBRIGEWITCH@bp.com
.Z,11& Contact Phone: +1 907 564 4854
Authorized Signature: ate:' 12,-
INSTRUCTIONS
General: This form is designed for submittin mplete and correct well completion report and log on all types of lands and leases in Alaska. Submit
a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is
a completion.
Item 1 b. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other.
Item 4b. TPI (Top of Producing Interval).
Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain).
Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests
as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
Daily Report of Well Operations
M-01
ACTIVITYnATF SUMMARY
CTU #9 - 1.75" Coil
Job Objective: Jet Ice Plug, Cement P&A
MIRU CTU. Make up 1.75" Ice Pick DJN and RIH. Tag ice plug @ 1687' and begin jetting
w/ 50/50 methanol. Broke through and lost returns @ 1891', swapped Slick 1% KCL down
backside. Killed well. MU & RIH w/ 2.0" BDN
9/17/2018
...Job in progress ......
CTU #9 - 1.75" Coil ***Continue from 9/17/18***
Job Objective: Jet Ice Plug, Cement P&A
Tag CIBP @ 8923', PUH 10'. Pump 17 bbls of 15.8 ppg Class G cement, estimated 4 bbls
cement behind pipe. Drop ball and contaminate down to 8600', chase OOH @ 80%
washing jewelery, tree, & BOPs. Lay in 50/50 methanol from 2600' to surface for freeze
protect cap.
9/18/2018
***Complete***
T/I/O 291/382/15. (LRS Unit 76 -Assist Slickline: AOGCC MIT -T)
MIT -T to 2562 **PASS** Max applied 2750 psi. Target 2500 psi. Pumped 0.89 bbls to
achieve test pressure. 1st 15 min loss 117 psi 2nd 15 mins loss 24 psi. Bleed back 1.1
10/1/2018
bbis.
***WELL SHUT IN ON ARRIVAL***(p&a)
TAG TOP OF CEMENT @ 8577' SLM WITH 1.9" CENT & 1.75" SAMPLE BAILER(hard
tag & witnessed by AOGCC Matt Herera)
LRS MIT TUBING TO 2500 PSI. (pass & witnessed byAOGCC Matt Herera)
RETAG TOP OF CEMENT @ 8577' SLM.(recover 2 teaspons of hard cement chunk&
witnessed by AOGCC Matt Herera)
10/1/2018
***WELL LEFT SHUT IN. DSO WALK THROUGH UPON DEPARUTURE***
Suspended Well Inspection Report
InspectNo: susAGE190618093027
Date Inspected: 6/2/2019
Inspector: Adam Earl
Well Name:
PRUDHOE BAY UNIT M-01
Permit Number:
1690780
Suspension Approval:
Sundry # 318-222
Suspension Date:
10/1/2018
Location Verified?
.❑
If Verified, How?
Other (specify in comments)
Offshore?
❑
Well Pressures (psi): Tubing:
IA:
OA:
Wellhead Condition
good condition valves operable
Condition of Cellar '
Type of Inspection: Subsequent '
Date AOGCC Notified: 6/1/2019
Operator: BP Exploration (Alaska) Inc.
Operator Rep: Josh Prowant
Wellbore Diagram Avail?
Photos Taken? ❑D
Fluid in Cellar? ❑D
50 BPV Installed? ❑
50 VR Plug(s) Installed? ❑
Surrounding Surface Condition
Ground work platform around well, cattle guard in place, clean , no sheen -
Comments
Looks like its being prept for proper abandandment/location verified by pad map
Supervisor Comments
Photos(3)attached
Wednesday, August 14, 2019
Suspended Well Inspection — PBU M-01
PTD 1670780
AOGCC Inspection Report #susAGE190618093027
Photos by AOGCC Inspector A. Earl
6/2/2019
rm
4)
2019-0602_Suspend_PBU_M-1 _photos_ae. docx
Page 1 of 2
4
� weu: nn -o1
OWNER Prudhoe Bay Unit
OPERATOR BP Exploration (Alaska) Inc.
API NUMBER 50-029-20042-00-00
1 SUR. LOCATION SE 1/4, Sec. 01, T11N, R12E
DRILLING PERM:T 169-078
2019-0602_Suspend_PBU_M-1 _photos_ae.docx
Page 2 of 2
TREE= • 6" CNV/ 5000 PSI
WELLHEAD =
FMC
ACTUATOR =--
OTIS
OKB. E LEV
- -N_
BF. E LBt = -_
- 25.29'
________--__________-_______________-______
KOP =
2400'
Max Angle =
---_-_________=-_--___._-_---_---_-_--.-----_--_--
7.5 � 2400'
[?atum MD
8852'
_
Datum TVD=_ --W___
88w -:S -S-
13-3/8" CSG, 61#, J-55, D = 12.515" 92W
9-5/8" CSG, 47#, N-80, D = 8-68f']—[4087'
Minimum ID = 2205" a@ 8462'
2-7/8" OTIS XN NIPPLE
1 2-7/8" TBG, 6.5#, N-80, 0.00579 bpf, D = 2.441' 1—i 8496'
PERFORATION SLANUARY
REF LOG. BHI S/GR ON 08/24/69
ANGLE AT TOPPB;r. 1 Q 8710'
Note: Refer to Production DB for historical perf data
SIZE
SPF
INTERVAL
OPNISOZ DATE
1-11/16"
4
8710-8730
S 09/18/18
1-11/16"
4
8730-8750
S 09/18/18
2"
4
8750-8760
S 09/18/18
1-11/16"
4
8760-8766
S 09/18/18
2"
4
8766-8794
S 09/18/18
1-11/16"
4
8794-8832
S 09/18/18
2"
4
9055-9066
S 09/18/18
2"
4
8994-9008
S 09/18/18
2"
4
8966-8982
S 09/18/18
2"
8
8822-8887
S 09/18/18
2"
4
8804-8818
S 09/18/18
1-11/16"
4
8994-9008
S 09/18/18
PBTD 9268'
7" CSG, 29#, N-80, D = 6.184" 9397"
M _0 NOTES:
8341' 1-12-7/8- OTIS SLDING SLEEVE, K)=2 -313-
I
=2.313"
I 83W II BTM OF SEAL ASSY
T X 2-7/8' BAKER FB -1 PKR
8431' 2-7l8" 0715 X NP, D = 2.313'
8462' 2-7/8' OTIS XN NP, D = 2.205'
2-7/8" TUBING TAL
8911' ELMD TT LO(,GT 05/26/84
8860 TOC (09/18/18)
8945' —17" BRDGE PLUG
9040 7" BRDGE PLUG
DATE FEV BY COMMS
DATE REV BY C OM134M
08/30/69 ORIGML CONPLEnON
2038' —14-1/2' X 2-7/8' THERMOCASE BTM
02/27/01 SIS-Isl CON BUED TO CANVAS
03/14/01 SIS -MD FINAL
2079' 2-7/8 —OTIS SSSV LANDING NP,
8341' 1-12-7/8- OTIS SLDING SLEEVE, K)=2 -313-
I
=2.313"
I 83W II BTM OF SEAL ASSY
T X 2-7/8' BAKER FB -1 PKR
8431' 2-7l8" 0715 X NP, D = 2.313'
8462' 2-7/8' OTIS XN NP, D = 2.205'
2-7/8" TUBING TAL
8911' ELMD TT LO(,GT 05/26/84
8860 TOC (09/18/18)
8945' —17" BRDGE PLUG
9040 7" BRDGE PLUG
DATE FEV BY COMMS
DATE REV BY C OM134M
08/30/69 ORIGML CONPLEnON
10/17/18 JN /JM3 ADDED KB & BF ELEV
02/27/01 SIS-Isl CON BUED TO CANVAS
03/14/01 SIS -MD FINAL
11/22/01 FW'TP CX)RRBCTIONS
03/17/16 JWJMD XN NP D
09/20/18 JCS/JMD a uBa P&A/SOZ PEWS
FRIAHOE BAY UPfr
WELL: M-01
PBRUT Pb: P1690780
AR No: 50-029-20042-00
SEC 1, T11N, R12E� 1999' NSL & 458' WE L
BP Exploration (Alaska)
•
MEMORANDUM
TO: Jim Regg Qer 10131(Q
P.I. Supervisor �
0
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: October 1, 2018
SUBJECT: Well Bore Plug for Suspended Well
PBU M-01
FROM: Matt Herrera BPXA
Petroleum InspectorSCoHED out'." " PTD 1690780; Sundry 318-222
Section:
1
Township:
11N
Range:
12E '
Surface:
Drilling Rig:
n/a
Rig Elevation:
n/a
Total Depth:
9366
Operator Rep: Jeremy Grimes I
Casing/Tubing Data (depths are MD):
Conductor:
20"
O.D.
Shoe@
100
- Feet
Surface:
13 3/8"
- 0. D.
Shoe@
928
Feet
Intermediate:
9 5/8"
0. D.
Shoe@
4087
- Feet
Production:
0. D.
Shoe@
Feet
Liner:
7"
0. D.
Shoe@
9366
Feet
Tubing:
2 7/8"
0. D.
Tail@
8495
Feet
Plugging Data:
Test Data:
Suspend: X '
Meridian: Umiat
Lease No.: ADL 028260 -
P&A:
Casing
Removal:
Csg Cut@
Feet
Csg Cut@
Feet
Csg Cut@
Feet
Csg Cut@
Feet
Csg Cut@
Feet
Tbg Cut@
Feet
Type Plug
Founded on
Depth Btm
Depth To
MW Above
Verified
Open Hole -
Bridge plug -
8945' -
8577'
15.8 ppg
Wireline tag
Initial 15 min 30 min 45 min Result
Tubing
2708
2585
2562
P
IA 470 458
456
OA 16 16
16
Remarks:
Traveled to PBU M -Pad to well M-01 and met with BP Rep Jeremy Grimes for Plug Tag/ MIT -T per Sundry 318-222.
Schlumberger Slickline was rigged up for the tag. Coil Unit had previously set a CIBP and topped off with 53 BBL's of 15.8 ppg
cement up to right below 2 7/8" tubing approximately 8600 ft MD. Little Red Pump Truck was rigged for pressure testing tubing.
Slickline tripped in the hole and tagged TOC at 8577 ft MD. Little Red Truck pressured up tubing to 2708 PSI and readings 4�1
taken at 15 minute intervals. 1 BBL pumped to attain required PSI for pressure test. 1 BBL bled back to desired tubing pressure
per Operator. Slickline tripped back in the hole and tagged TOC to verify plug didn't shift downhole during pressure testing.
Tagged TOC again at 8577 ft MD.
Attachments: None
rev. 05-25-18 2018-1 001_PlugVerification_PBU_M-01_mh
SOFTJi •
h \li/.:e?. THE STATE Alaska Oil and Gas
N ofALASKA Conservation Commission
}#2 �_ 333 West Seventh Avenue
e, Alaska 99501-3572
Anchorage,GOVERNOR BILL WALKER g
0 P Main: 907.279.1433
91‘ Fax: 907.276.7542
www.aogcc.alaska.gov
Beau Obrigewitch SCANNED JUN t► 72'018
Well Integrity Engineer
ineer
BP Exploration(Alaska), Inc.
P.O Box 196612
Anchorage,AK 99519-6612
Re: Prudhoe Bay Field,Prudhoe Oil Pool, PBU M-01
Permit to Drill Number: 169-078
Sundry Number: 318-222
Dear Mr. Obrigewitch:
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Hollis S. French
Chair
J
DATED this day of June, 2018.
RBDMS NUN 0 6 2018
STATE OF ALASKA
• S �'15-
s/j
ALASKA OIL AND GAS CONSERVATION COM ON ��V
iiLOEWED
J-q-
APPLICATION FOR SUNDRYAPPR S Ali 3 0 2W8
20 AAC 25.280
1. Type of Request: Abandon ❑ Plug Perforations 0 . Fracture Stimulate El Repair Well 0 O
Suspend 19 e Perforate El Other Stimulate 0 Pull Tubing 0 Change Apovproved�Prog '❑
Plug for Redrill 0 Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other El
2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 169-078
3. Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development ❑
99519-6612 Stratigraphic 0 Service B
6. API Number: 50-029-20042-00-00 •
7. If perforating: 8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception? Yes ❑ No 11 PBU M-01 •
9. Property Designation(Lease Number): 10. Field/Pools:
ADL 028260 • PRUDHOE BAY.PRUDHOE OIL •
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD):
9397 • 9386 - 8945 8934 8945.9040 None
Casing Length Size MD IVO Burst Collapse
Structural
Conductor 80 20" 20-100 20-100 1530 520
Surface 908 13-3/8" 20-928 20-928 3090 1540
Intermediate 4070 9-5/8" 18-4087 18-4078 6870 4760
Production 9351 7" 16-9366 16-9355 8160 7020
Liner
Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
8710-9008 8699-8997 4-1/2"Thermocase x 2-7/8"6.5# N-80 14-8495
Packers and SSSV Type: 2-7/8"Baker FB-1 PERM PKR Packers and SSSV MD(ft)and ND(ft): 8380/8369
No SSSV Installed No SSSV Installed
12.Attachments: Proposal Summary El Wellbore Schematic El 13.Well Class after proposed work:
Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development 0 Service El •
14.Estimated Date for Commencing Operations: June 15,2018 15. Well Status after proposed work:^ / V�.
. Oil 0 WINJ Air V WDSPL 0 Suspended IV
16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0
Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0
17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Obrigewitch,Beau
be deviated from without prior written approval.
Contact Email: BEAU.OBRIGEWITCHl bp.com
Authorized Name: Obrigewitch,Beau Contact Phone: +1 907 564 4854
Authorized Title: ell Integri Engineer .-
Authorized Signature: .1/D Date: /6/-Z VI d 113
l COMMISSION USE ONLY
Conditions of approval:Notify Commission so that a representative may witness Sundry Number: )3_
3_ !/�/I 2
Plug Integrity BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0 G2
Other:
Post Initial Injection MIT Req'd? Yes❑ No V/
Spacing Exception Required? Yes El No CST Subsequent Form Required: /o 42 7—
t.....40E5q"---kAPPROVED BYTHE /Approved by: COMMISSIONER COMMISSION Date: { 2l IS11€)
rrt 6/i/J
OR4 ,� DMS1JUkouL8I GINAL /4���ff
�
ip. „30,ve.
1
Submit Form and
Attachments in Duplicate
Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval.
bp
0
M-01 Reservoir Abandonment
Intervention Engineer
Beau Obrigewitch (907) 564-4854
Production Engineer
Lea Duong (907) 564-4840
Estimated Start Date
June 15, 2018
History
Well M-01 was originally drilled and completed as a producer in 1969, was converted to an injecto in
1984, and has been shut in for over twenty years. In April 2018, the BP Well Integrity Superintend:nt
notified AOGCC that this well had been flagged as having similar construction to PBU Well 02-03, and
as such would be secured. The well currently has an ice plug in the tubing at 1,764'. With no known
mechanical integrity issues with the well, the upper completion and surface location will be retained for
use as a sidetrack candidate.
Objective
This intervention is to effectively secure this well and mitigate risk by completing the first sta e
reservoir abandonment in compliance with 20AAC 25.112 (c) (1) (C) by the displacement method a
cement plug placed from the well's plugged-back total depth to 100 feet above the top of the perforat d
interval.
• •
Job Steps
1 C Jet Ice Plug; Injectivity Test; Drift and Tag
2 F Pump Reservoir Abandonment Plug
3 S WOC 3 Days:
1) Drift and Tag TOC �j Jfi�t �° r S5
2) MIT-T O 24- dot pia
Procedural steps
Coiled Tubing
1. Jet ice plug, injectivity test, drift and tag
Fullbore
2. Reservoir Abandonment Plug parameters:
Cement Window:
Target TOC: 8,600'
Shallowest Allowable TOC: 8,500' (to prevent cement in 2-7/8" tubing @ 0.00579 bpf)
Perf Info:
Top Open Perf: 8,710'
Bottom Open Perf: 8,887'
Cement Volumes:
Target TOC (8,600') to Bottom Perf (8,887') = 10.3 bbls
Target TOC (8,600') to Top Perf (8,710') = 4 bbls
Shallowest TOC (8,500') to Top Perf (8,710') = 7.8 bbls
Calculated Tbg volume from surface to target TOC (8,600') = 53 bbls
Worst-Case TOC: Well locks up with cement (10.3 bbls) at Top Perf (8,710'): 8,068' (312' above PKR)
3. Cement 7" Liner as Follows:
• Request Valve Shop service all tree valves
• Rig up to IA, OA, and OOA to be able to bleed as needed. All annuli are fluid-packed and need
to be monitored for AFE while pumping cement job.
• Rig up iron for Fullbore Cement job, to include ball launcher loaded with two 5" (4" acceptable
based on availabilitYYPoamiaalls and horse trailer (or 4-way manifold) providing the cementers
one tie-in location.
• Pump Schedule for Cement Job:
(Pump at max rate, not to exceed 2,500 psi, except where noted)
i. 10 bbl meth spear
ii. 90 bbls 1% KCI to kill and fluid pack well, or until stable injection rate and pressure are
attained
iii. 10.3 bbls 15.8 ppg class G Cement
iv. 2 bbls fresh water to clear lines
Divert flow through ball launcher and drop balls. Open workover valve then low-torque, in that order.
v. 5 bbls water behind ball
Open side outlet of cement manifold to pump into both inlets.
vi. 46 bbls 75°F diesel
46 bbls of diesel will put the cement at the requested depth. With 36 bbls of diesel away (lead cement
is hitting top perf), slow rate to -1.0 bpm and pump final 10 bbls of displacement. Do not exceed 46
bbls of diesel (53 bbls of TOTAL cement displacement).
2
• 0
If well squeezes off(increase of 800 psi or more starting when cement reaches perfs)
• Max squeeze pressure is 3000 psi.
• Hold pressure for 30 minutes, and then bleed down to 500 psi.
If no squeeze pressure is achieved:
• After design displacement, shut-in well and rig down.
• Wash up cementers
• RD SLB cementers
• Call Valve Shop to service Tree (Post Cement)
Note: These cement volumes are based on 2 assumptions: 1) Coil can tag near/below the bottom open pe at
8,887' and 2) Coil achieves sufficient injectivity to indicate the cement can be pumped fullbore from surfac . If
either of these conditions change dramatically, decrease the amount of cement pumped accordingly, to
prevent leaving cement in the 2-7/8" tubing.
Cement Calculations — 7" Liner Cement Plug
7" volume from 8,887' MD to 8,600' MD (0.0371 bpf) 10.3 bbls
Total Cement to Pump (no excess) 10.3 bbls
Cement Type/Weight Class G 15.8 ppg mixed on the fly
Field blend to by equal to lab +/-0.1 ppg
Slurry Temperature 80° to 110° F
Fluid Loss 40-200cc (20-100 cc/30 min)
Compressive Strength 2000 psi in 48 hrs
Thickening Time Minimum 9 hours
Cement thickening time: Mix on the fly
Activity Time (hours)
Shearing time, quality control, PJSM 0
Cement displacement 1
Cement contamination 0
Safety 2
Minimum required thickening time: 3
Cement Ramp for Blend
Volume Pumped Temperature Pressure
Time (bbls) (°F)
(psi)
0:00 0 100 0
0:30 10.3 100 1600
0:45 10.3 130 3300
1:00 10.3 150 3300
2:00 10.3 170 3300
3:00 10.3 170 3330
*Note: This table assumes a worst-case 1 bpm pump rate.
Slickline
4. Drift and tag TOC with sample bailer. Notify AOGCC Inspector of the timing of the Cement plug gag
and pressure test (24 hour minimum notice).
5. MIT-T (with diesel) to 2,500 psi. If fails, attempt to get LLR, RDMO.
3
• •
Pre Job Schematic:
11-1E- 6"CM/5030 PSI
SAFt1 Y NOTES:
ill-CAD= PIC
ACTUATOR= 071S M n"0
KB EL EV= 42.76'
EC.a..ev= 25.57;
KOP= 2400'
Max Angle,,-- 7 5 CO 2400'
[
retro kn. 8852'
Celurn TVO= 8800'Se
13 318-CBG.61e..1-55.ID-12.51r I— 928 v I 2038* —4T-T2"X 2 718"THEMADCASE SIM
v
2079' I-1:1 /Pr ci 1 r-,s.,,:..-,v IAN(lor*,N11-, 11 i
0
i II-Sie CSG,474 NU ID•,-8 881" I— 4087' 1----46 k
,
1 8341' 1-12-7/3'071S SLDCG Si EFVE,10=7 313"
Minimum ID -2.205"@ 8462' I I
2-718"OTIS XN NIPPLE
83110 —I ETT1OF EA L ASSY
8380' I-17"X 2-7/8'BAKER F8-1 MR]
i I 8431' J--12-7/8-0715 X
I i 11442' H7-7/8"ors XN HP.13=2206' ]
r--------- —
'2-7/6"TBG,8.5*,N-80,0.00579 bpi,13=2,441' H ear ]• , 806' —2-71r YUBNG TA L
PERFORATION 51) 64A
RET LOG:B1-12S/GR ON 08/24/69
I
ANGLE AT TOP PERE 1 fa 8710'
Note:Refer to Roducbon DB for hielortal peri dab _
SIZE SPF NTERVAL CITISOZ IATE _
1-11/16' 4 8710-8730 0 05/26/84
1-11/16' 4 8730-8750 0 05/26/84
I
7 4 8750-8760 0 ' 07172
1-11/16" 4 8760-8766 0 05/26/84
I
2- 4 8706-8794 0 ' OTfT2
1-11/16' 4 8794-8832 0 05/26/84
2' 4 5055-9066 0 ' 07/72
I
2' 4 8994-9008 0 ' 07172
2' 4 8966-8982 0 ' 07/72
2' 8 8822-888/ 0 ' 07/72
r 4 8804-8818 0
r07/72 110.411 [_894—e-147-BRIDGE PLUG1
1-11/16* 4 8994-9008 0 05/26//34
„„„..________
1 : - ----- -- '-----8848;--"I--iirliRE/GE PLUG 1
1F-rii"4e;--1 .11.4110.0
f1.1..11.4
11.14411440
T CSG,29iv,N43o,0-6 184-1-1 93w ] JAAJAAJAAJO
Ile,lb 1 I-1EV LW 1 000.41/ENTS L .lb REV BY EX.44AENI S 11RIX110E BAY UPC
08/30/69 1- 10F401441_COWLET1ON MIL. A4-01
02/27/01 t SIS-Isl i CONVERTEO TO CANVAS RERNIT NO7'1690780
1 4
03/14/01,4 515-14) !MAL API No: 50-029-20042-00
11&2/01 i Piirl-P I ooePEcnotts SEC 1,TlIN,RI2E.1999'F1SL&458'%AU_
03/17/16 1:JA44JNID1OOFFECTID XN NPI)
BP Exploration(Alaska)
4
• •
Post Job Schematic:
TRa- e'LAN/5C00 PSi
i SAFETY NOTES:
VIIILI-EAD- F1VC
ACTUATCR. CITE; M 4)I
KB FLEV. 427$
BF.MEV- 25.57'
i [ 1
KOP=. 2400'
Max Angle- 7 5 2400'
IDolum I‘4) 88,57'
Caton NO 880,CY••-•:',6
! 13:.1/8"czio. .6.14.J 55 t) 12 515' I—I 928• i1 2038' 14 1,:'"X::' /.8" IlitHIW.XIASE t31V
./ N., —
2079' I 1.' I.,j"(1.1 t',,)N.Y..-.)/I A NtSNG N1P U '..' %Jr I
0
9- * (-SG.474 N-80 If) i,V31' I I 408T F— I
I 8341' 1---12-7te.011S SLICNNG SULAM.CI*.2.313" 1
Minimum ID ale 2.205"@ Mr I I
2-718"011S XN NIPPLE
_ 8380' -filV OF SFIXI7A—TSSY
------ ----- 8380' j I F--)(2-7W 1311Kt1,1113 I FR]
I I [ 8431' I—2-7/8'011S X NP ID-=2 3111
1 8482' 2-710"OM XN NP ID-,-)2 205" 1
1.. ..78--TBG-658,N-80,0.00579 bpf,ID=2&St*" H 8496' f— ' \ 849 ' H2-7/11'TI1B/NG TAL.
PERFORATION SUMMARY -
--,,,
REF LOG:BliCS/OR ON 08124/69 -8,600'TOC in Liner
ANGLE AT TOP FERF:1 a 8710'
Pble:Refer b Production CB for hisioncal pelf data -
SIZE SPF NTERVAL OPWSOZ DUE -
1-11/16" 4 8710-8730 0 05/26/84
1-11/16' 4 8730-8750 0 05/26/84
2" 4 8750-8760 0 ' 07172
1-11/16" 4 8760-8766 0 05/26/84 1
r 4 me-0794 0 ` OTIT2
1-11/16" 4 8794-8832 0 05/28/84 1
r 4 9055-9093 0 p07/72
r 4 8994-9008 0 r 07172
2" 4 8988-89E12 0 r 07172
7 8 8822-8887 0 ' 07172
r 4 8804-P.818 0 r 07/72
894 h* j--1-7"ElfithE P1.31-10
1-11116' 4 8994-90ill 0 05/28/84
_ . ...,
' 9040' 1 17"FiRIXT F1 UGi
10.0....041..14.1111.
..
i 400....414.
r C.SG,29*, 80,D•11184'H nor 1 .............0...0
1 LTA TE 'REV BY COMIVENTS DATE REV BY 00k6ENTS FITUDHOE BAY uNi1
i
ORIGINAL COWLETION VAIL- M-01
02/2001 SIS-191 CONVERTED TO CANVAS R3941 No:r1690780
03/14/01/ SE--MD FNAL API No: 50-029-20042-00
11/22/01 RMFFP CORRECTIONS • SEG 1,T11N,RI2E 1999'NSI_&456 Via
03/17/16 JIAMIJIAD CORTVLIMXN NP ID
BP Exploration(Alaska)
5
• • ��Tn /� 9 - a75
Loepp, Victoria T (DOA)
From: Regg, James B (DOA)
Sent: Monday, April 30, 2018 1:37 PM
To: Loepp, Victoria T (DOA)
Subject: FW: Producer J-01B (PTD#2022010) Similar Construction Geometry to 02-03
Follow Up Flag: Follow up
Flag Status: Completed
Jim Regg
Supervisor, Inspections
AOGCC
SCANND MAY 21 2;018
333 W.7th Ave,Suite 100
Anchorage,AK 99501
907-793-1236
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged informati.n.
The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail
please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 90
793-1236 or jim.regg@alaska.gov.
From:AK, GWO SUPT Well Integrity<AKDCWelllntegrityCoordinator@bp.com>
Sent: Monday, April 30, 2018 1:35 PM
To: Regg,James B (DOA)<jim.regg@alaska.gov>
Cc: Loepp,Victoria T(DOA) <victoria.loepp@alaska.gov>; Foerster, Catherine P (DOA)<cathy.foerster@alaska.gov>;
Schwartz, Guy L(DOA)<guy.schwartz@alaska.gov>; Rixse, Melvin G (DOA)<melvin.rixse@alaska.gov>; Daniel, Ryan
<Ryan.Daniel@bp.com>; Cismoski, Doug A<CismosDA@BP.com>; Romo, Louis A<Louis.Romo@bp.com>; AK, GWO Well
Integrity Engineer<AKGWOWellSiteEnginee@bp.com>
Subject: RE: Producer J-01B (PTD#2022010) Similar Construction Geometry to 02-03
Jim,
Per my voicemail, we will reclassify the wells with gravel protection strings Not Operable:
• Producer S-122 (PTD 2050810)
• Injector W-209 (PTD 2031280)
• Injector W-214 (PTD 2071420)
• Injector W-216 (PTD 2071680)
Our surface casing depth verification project identified 2 other wells with surface casing set in the permafrost(both Long
Term Shut Ins):
• Producer E-28A(PTD 1990610)—will reclassify Not Operable
• Injector M-01 (PTD 1690780)—already Not Operable due to remaining shut in past its 4-year witnessed test date
BPX✓A's�Tubular Design Advisor will review all of these wells. Upon completion, we'll present the findings to the AOGCI.
In the meantime, all will remain Not Operable and shut in.
1
•
• •
Thanks,
Adrienne McVey
Well Integrity Superintendent—GWO Alaska
(Alternate:Jack Lau)
•
0:(907)659-5102
C:(907)943-0296
H:2376
From: Regg, James B (DOA) [mailto:jim.reqg@alaska.gov]
Sent: Friday, April 27, 2018 2:18 PM
To: AK, GWO SUPT Well Integrity
Cc: Loepp, Victoria T(DOA); Foerster, Catherine P (DOA); Schwartz, Guy L(DOA); Rixse, Melvin G (DOA)
Subject: RE: Producer J-01B (PTD #2022010) Similar Construction Geometry to 02-03
Thank you for the follow-up email. Just to be clear,are the S-pad and W-pad wells with gravel protection strings also
going to be reclassified as"not operable"to verify they are not at risk for failure like PBU 02-03B?
When BP is finished with the reviews of the wells, please arrange for a meeting to present your findings to the
AOGCC. That can be coordinated with Victoria.
Jim Regg
Supervisor, Inspections
AOGCC
333 W.7th Ave,Suite 100
Anchorage,AK 99501
907-793-1236
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged informati n.
The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,
please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 9 7-
793-1236 or jim.reggPalaska.gov.
II
From:AK, GWO SUPT Well Integrity<AKDCWelllntegrityCoordinator@bp.com>
Sent: Friday,April 27,2018 1:51 PM
To: Regg,James B(DOA)<iim.regg@alaska.gov>
Cc: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov>;Cismoski, Doug A<CismosDA@BP.com>; Daniel, Ryan
<Ryan.Daniel@bp.com>;AK,GWO Well Integrity Engineer<AKGWOWellSiteEnginee@bp.com>
Subject: Producer1-01B(PTD#2022010)Similar Construction Geometry to 02-03
Jim,
To summarize our phone conversation today:
• After the 02-03 incident,we reported to the AOGCC 14 wells with similar construction geometry; i.e.a 3-string
casing design,and the surface casing shoe set in the permafrost.
• Yesterday,we identified one additional well with similar construction geometry:J-01.
• We do not believe that J-01 is at risk of an event similar to 02-03, because, unlike 02-03,all three strings of
casing are anchored together with cement.We believe this eliminates the potential for differential force loa ing
at the wellhead.
2
•
•
• However,we are going to reclassify J-01 Not Operable, shut it in,and secure it, until we can perform modelinf
to verify.
• We also identified 4 wells on S-Pad and W-Pad that have 13-3/8"gravel protection strings set in the permafro t,
and 2 casing strings within. I'm investigating the details now, but I do not believe these wells present a risk.The
13-3/8" is a second conductor,and not coupled to the inner casing strings at the wellhead. In the event the 13-
3/8"were to subside, it would not impart a load to the inner casing strings via the wellhead. I will follow up on
these wells as soon as possible.
Thanks,
Adrienne McVey
Well Integrity Superintendent—GWO Alaska
(Alternate:Jack Lau)
0:(907)659-5102
C:(907)943-0296
H:2376
3
ALAS .,ND GAS CONSERVATION COMMissION
C. V~C~atterton December 16,
Chai,~.~'n
_.. D.BDF.89
1986
Lonnie C. Smith
Commissioner
Bobby D. Foster
Petroleum Inspector
Mech Integrity Test
SAPC PBU Pads S, M, U,
R, N, T, Y, H, F, X
Prudhoe Oil Pool
Wednesday, November 19, 1986: The tests began at 7:00 a.m. and
were concluded for the day at 4:30 p.m. with 10'wells being tested.
Thursday, November 20, 1986: The tests began at 7:00 a.m. and were
concluded for the day at 7:00 p.m. with 1~4' wells being tested.
~riday, November 21t 1986: The tests began at 6:30 a.m. and were
concluded for the day at 4:30 p.m. with 1Owells being tested.
....
Saturday, November. 22,_ 1986: The tests began at 6:30 a.m. and were
concluded at 1:00 p.m.; and were resumed at 6:00' p.m. and concluded
for the day at 9:00 p.m. ~f'~"f! ~P~'~'~.,
As the attached mechanical integ~tv~io~%test ~ports show, 3'9~wei*l~s.
were tested, all of which met the~AOGCC regulations.
In summary, I witnessed the mechanical integrity tests on Standard
Alaska Production Company's injections wells listed on the attached
test forms.
Attachments
AIASKA OIL AND. GAS CONSERVATION COb~MISSION
bMC~Ia_NICAL INTEGRITY TEST
PRESS PRESS PRESS
..... ~ [~ _ , i ~ ~ .%
.-, - -' ".d,'~, -~-/-~ ~ ~ ~:' 'D,'~'~/, . ,
~TUBING IN3ECTION~: ANNULAR FLUID: GRADIENT: AOGCC WITNESS SI ,.' ·
S -', SALT WA_TER INJ GLYCOL C~MPANY REP SZGNATURE <3.
M - ~zscnm~ ~.mcrzoN SAlT w>mm ..~A_,>~y_.~. ,~ ..~.)..t,,~ ~
, I - INJECTII~ DRILLING MUD 20 AAC 25.030(a)
N - NOT II~ OTHER 20 AAC 25.412(c)
--',.~- '- - OTHER . 20 AAC 25.252(d)
...:.i~::~,?~;~: · ~.-: -:: .
"!
" D.EWS.06 0 - ~ i"'
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
To: SFO/UNIT/STATE: TE]CACO
(-Marathon) MOBIL
PHILLIPS ~
STATE OF AK
BPAE
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-61 2
ANCHORAGE. ALASKA 99502
· , .
Date: 7/26/85
T#: 76340
REFERENCE:
SOHIO CASED HOLE FINAL LOGS _ ~ '
The following material is being submitted herewit~P~ease acknowledge receipt by signing a
copy of this letter and returning it to this office:--
E-1-'~ CN~ 3/17/85 #3 9100-9772 ..... Snh 5"
E-10'" CNL(CNTD2 1/2") 5/20/85 #1 10850-11672 Sch 5"
Q-3'-- CNL 3/16/85 #4 8600-9428 Sch 5"
M-i-" EPL .3/2/85 #1 8600-8899 Sch 5"
M-9-~ EPL 3/10/85 #3 9950-10300 Sch 5"
R-6~' EPL 1/10/85 #3 9850-10400 Sch 5"
A-8j DFT 7/9/85 #1 95~0-9840 Camco 5"
A-17"'Temp. 7/7/85 #1 9850-10750 Camco 5"
A-27-"'DFT 7/12/85 #1 8800-9300 Camco 5"
H-9-"_ DFT 7/11/85 #1 9600-10356 Camco 5"
U~3/ Temp. 7/05/85 #2 8950-9550 Camco 5"
%/~'-9 '/ Temp 7/3/85 #2 10850-11300 Camco 5"
RECEIVED
DATt'
Oil & Gas Cons. Commission
Anchorage
Victoria Aldridge LR2-1
Technical Documentation
Records Management
I NI)I';XI']I)
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
TO~ SFO/UNIT/STATE: TEXACO
(-Marathon) MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
31 1 1 "C" STREEl
ANCttORAGE. ALASKA
tELEPHONE 1907l 265-0000
MAIL' POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 4/29/85
T#: 76155
M-12
R-7
R-20
REFERENCE:
..'~e following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
API#
0402 PFO a BHPD 3/01/85 Sch
593 PFO a BHPD 2/23-24/85 Sch
523 PFO & BHPD 3/6-7/85 Sch
641 PFO & BHPD 2/9-20/85 Sch
RECEIVED
DATE
4/'/~,/~^ 0~. ^ Dev~-l-opmen t Oeo
"~Z~?~ ' uO~/~81oW e l ltl Records logy
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
October 10, 1984
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Gentlemen:
Wells M-i, M-2, M-3, M-12, M-13, M-14, R-2, R-5, R-7, R-20
S-6, S-9, S-ll, S-14, PBU
Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our subsequents to
converting the wells from oil wells into water injection wells.
Yours very truly,
Enclosures
cc:
J. D. Hartz
Well File ~17
RECEIVED
OCT ! 2 ] 114
Alaska 0ii & Gas Cons. Commission
Anchorage
STATE OF ALASKA (
ALASH ,3IL AND GAS CONSERVATION 3MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL [~
OTHER []
2. Name of Operator
Sohio Alaska Petroleum Company
3. Address
P.O. Box 6612, Anchoraqe, Alaska
4. Location of Well
At Surface:
99502
1999' NSL, 458' WEL, Sec. 1, TllN, R12E, UPM
6. Lease Designation and Serial No.
ADL
2-8260
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 42.76' AMSL
7. Permit No.
69--78
8. APl Number
50~29-20042
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
M-1 (43-01-11-12) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
SUBSEQUENT REPORT OF:
(Submit in Duplicate)
[] Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
This well was con~erted from a Prudhoe Bay Production well into a
produced water injection wellfor 1984 P.W.I. water flow evaluation
on August 13, 1984. Water was injected through the following
perforations at 4 s.p.f.
8710'-.8750' BKB
8750'-8760' BKB
8760'-8766' BKB
8766'-8794' BKB
8794'-8822' BKB
8822'-8887' BKB
RECEIVED
OCT ,! 2 ]984'
Alaska 0ii & Gas Cons. commission
Anchorage
I 1~:. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~?gn%ed (~~ ~ Title District Petroleum Engineer
¢
Condi~llhs of Approva, f any:
By Order of
Approved by COMMISSIONER the Commission
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
September 13, 1984
Alaska Oil & Gas Conservation C~mission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well M-1 (43-01-11-12) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named well. This contains our subsequent to
performing a scale inhibitor treatment on this well.
Your very truly,
JAB/J~/pjw
Enclosures
cc: J. D. Hartz
Geology
Well File 917
]%-. Bragg U (.] /
strict Petroleum Engineer (Acting)
RECEIVED
S EP 1 1984
'Naska Oil & Gas Cons. Commission
Anchorage
"~ STATEOF ALASKA N('~.3
ALASI( OILAND GAS CONSERVATIO MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL~
OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 69-78
3. Address 8. APl Number
P 0 Box 6612, Anchorage, Alaska 99502 50- 029-20042
4. Location of Weld
At Surface:
1999' NSL, 458' WEL, Sec. 1, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 42.76' AMSL
6. Lease D~signation and Serial No.
ADL 28260
9. Unit or Lease Name'
Prudhoe Bay Unit
10. Well Number
M-1 (43-01-11-12) PBU
11. Field and Pool
Prudhoe Bay
12.
Check Appropriate BOx To Indicate Nature of Notice, Repor't, or Other Dat'a
'NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [~',' Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25..105-170).
The following interval in this well was treated with 215 barrels of EDTA
solution on August 14, 1984,. The treatment was conducted through a
bullhead method. The SSSV was removed prior to the treatment and reset
after the job at 2079'.
8710'-8887' BKB (Ref. BHCS/GR, 8-24-69)
RECEIVED
SEP 1 4 1984
~Alaska Oil & Gas Cons, Commission
Anchorage
14. I/Jrhereby certify that the foregoing is true and correct to the best of my knowledge.
d Title District Petroleum Engineer
The space/~¢low__for Commission use '~J
Condition~ jCf A'~--~-~Ta-~, i~- ~
V
Date
By Order of
Approved by. COMMISSIONER the Commission
Date --- ..................................
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent RePorts" in Duplicate
E-5
M-1
R-5
R-12
SOHIO ALASKA PETROLEUM COMPANY
SF0
ARCO
CHEVRON
EXXON
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907)265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
f
~o. SFO/UNIT/STATE:
(-Mara tho n)
GETTY
MOB I L
PHILLIPS
STATE OF AK
BPAE (Transmittal Only)
CENTRAL FILES (CCI/' s-Transmittal Only)
Date: 9-11-84
CC#: 75715
REFERENCE:
S~O CASED HOLE FINAL
LOGS
~he following material is being submitted herewith, acknowledge
Please
receipt
by
signing
copy of this letter and returning it to this office:-
CONT. FLOW SURVEY
CONT. FLOW SURVEY
CONT. FLOW SURVEY
CONT. FLOW SURVEY
8-24-84 #1 GO 9700-10000
8-14-84 #1 GO 8450-8900
8-15,~6-84 #1 GO 8900-9220
8-18-84 #1 GO 10550-10950
11
5"
5"
(4/82)
RECEIVED
DATE
_ . Carolyn Bishop
Geology
,,~,.~,~..~.~~- ,' , ',-- Well Records
,. .... ,!'..,.,.i ~;'.". ?, ':'""
SOHIO ALASKA PETROLEUM COMPANY
S70
ARCO
CHEVRON
EXXON
3111 °'C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-61 2
ANCHORAGE, ALASKA 99502
To: SF0/UNIT/STATE:
GETTY
Date: 9-7-84
(-Marathon) MOBIL
PHILLIPS CC#: 75709
· STATE OF AK
BI~AE (Transmit t a!_,.Only) .... ~ .....
CENTRAL FILES(CC#'s-Transmittal 0nly)
ocs
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
M-1
M-i3
M-13
R-21
DFT 8-14-84 ~1 8450-8900 GO 5"
DFT 8-9,10-84 ~1 9350-9900 GO 5"
DFT 8-9,10-84 #2 9350-9900 GO 5"
CONT. FLOW SURVEY 8-12-84 #1 10100-10550 GO 5"
(4/82)
RECEIVED
DATE
OC~ I 3 1~ Development Geology
& Gas~9C0ns' Commis~l RecOrds
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
August 2, 1984
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Wells M-i, M-13, R-5, S-6, S-9, and S-14
Gentlemen:
Enclosed, in triplicate, are Forms 10-403~ Sundry Notices and Reports
on Wells~ for the above-named wells. These contain our proposals to
perform scale inhibitor treatments on these wells.
Enclosures
CC:
J. D. Hartz
Geology
Well File ~17
Yours very truly,
agg ~
District Petroleum Engineer
RECEIVED
0 6
Alaska 0il & Gas Cons. Commission
Anchorage
STATE OF ALASKA N{~,OMM ON
ALAS¢' . OIL AND GAS CONSERVATIO ISSI
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL:~
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum ~y 69-78
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20042
4. Location of Well
OTHER []
At Surface:
1999' NSL, 458' WEL, Sec. 1, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 42.76' AMSL
6. Lease Designation and Serial No.
ADL 28260
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
M-1 (43-01-11-12) PBU
11. Field and Pool
Prudhoe Bay
Pr~dhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
Pull Tubing
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate ~ i Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
[] Other I~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following interval inthiswellwill be treated with 215 barrels of EDTA
solution in August, 1984. The treatment will be conducted through a bullhead
method. The SSSVwill be removed prior to the trea~_ntand reset after the
job at 2079'.
8710'-8887' BKB (Ref. BHCS/GR, 8-24-69)
RECEIVED
AUG 0 6 ][9~
Alaska 0il & Gas Cons. Commission
Anchorage
n lelereby certify that the foregoing is true and correct to the best of my knowledge.
/~ Title DiStrict Petroleum Engineer
~o_w tor__~om.._m,sslon use"- V
Condi~on.~ of Approval, if any'.
Date
It! LON~IE t:. SMI,T~
Approved by COMMISSIONER
Approved Copy
Returned
By Order of
the Commission Date ..........................................
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
July 25, 1984
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
AStention; Mr. C. V. Chatterton
Gentlemen:
Well M-1 (43-01-11-12) PBU
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above-named well. This contains our proposal to
convert it from an oil well into a water injection well.
GJP/JI2.t/pjw
Enclosures
cc: J. D. Hartz
Geology
Well File ~17
s very truly,
District Petroleum Engineer
STATE OF ALASKA .,~.
ALASKA( _ AND GAS CONSERVATION Cd ,vllSSlON
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL ~ OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 69- 78
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 501~29-20042
4.1 Location of Well 9. Unit or Lease Name
At Surface: 10. Well Number
M-] (4.~-n]-11-1 :~) PBU
1999 ' NSL, 458' WEL, Sec. 1, TllN, R12E, UPM ~ 1. Field and Pool
_ Prudhoe Bay
5. Elevation'in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Pru~h. oe Oil Pool
_ KBE = 42.76' AMSL[ ADL 2.8260
12. Check APpropriate Box To indicate Nature of Notice, 'Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other ~] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
__
13. Describe Proposed' or Completed Operations (Clearly state all pertinent details and gi~e pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
With reference to the previous Sundry Notices dated: June 29, 1972, and May 17, 1984,
for the perforation of M-1 in the 7" casing, it is intended to convert this Prudhoe
Bay Production well into a produced water injection well for 1984 P.W.I. water.flow
evaluation. Water 'will ]:~. injected through perforations (4 SPF) at
8710'-8750' BKB
8750'-8760' BKB
8760'-8766' BKB
8766'-8794' BKB
8794"-8822' BKB
8822'-8887' BKB
J U L 0 1984
q Alaska 0it & Gas Cons, Commission
Anchorage
1~_i I hereb Ommission ile~iue and correct to the best of my knowledge.
Title District Pe, troleum Engineer Date
C° Approved Copy r
Returned
Bf [I]H~IE I~. $1~lftl By Order of
Approved by COM___M I_SS. ION E R the Commission,. Date .~_~.._~_..1
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
~o~SFO/UNIT/STATE: GETTY
(-Marathon) MOBIL
PHILLIPS
STATE
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-O000
MAIL: POUCH 6-61 2
ANCHORAGE. ALASKA 99502
Date: 6-25-84
CC#: 75426
BPAE (Transmittal Only)
CENTRAL FILES (CC#'s - Transmittal Only)
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
Thefollowin9 materialisbeingsubmittedherewith. Pieaseacknowledgereceiptbysigninga
copyofthisletterandreturningittothisoffice:--
B-8
M-1
PBU & PBU Data Sheet
PBU & PBU Data Sheet
6-12-84 GO
6-9-84 GO
F ECEIVED
JUN 2 ? 1984
Alaska Oil & Gas Cons. Commission
Anchorage
Carolyn Bishop
Development Geology
Well Records
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
June 21, 1984
Alaska Oil & Gas Conse~ation Com~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Gentlemen:
Mr. C. V. Chatterton
Well M-1 (43-01-11-12) PBU
Enclosed, in duplicate, are the following forms for the
above-named well.
1. Form 10-407, Completion Report.;
2. Form 10-403, Sundry Notice nd Reports on Wells;
3. Form 10-404, Monthly Report of Drilling and Workovers.
Enclosures
cc: J. D. Hartz
Well File #17
Yours very truly,
G. 'J . Pli~neer
,IUN 2 2
Alaska Oil & Gas Cons, commfssion
AND GAS CONSERVATION C(I .MISSION
WELL COMPLETION OR RECOMI LETION REI ORT AND LO
1. Status of Well Classification of Service Well
OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleum ~y 69- 78
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20042
4. Location of well at surface 9. Unit or Lease Name
1999' NSL, 458' WEL, Sec. 1, TllN, R12E, UPM Prudhoe Bay Unit
At Top Producing Interval top of Sag. R. SST. 10. Well Number
2032' NSL, 678' WEL, Sec. 1, TllN, R12E, UPM M-1 (43-01-11-12) PBU
At Total Depth 11. Field and Pool
2038' NSL, 677' WEL, Sec. 1, TllN, R12E, UPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Pru~oe Oil Pool
KBE = 42.76' AMSLI ADL 28260
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions
7/21/69 8/24/69 10/29/79I feet MSL 2
17. TotaIDepth(MS+TVS) 18.PlugBackDepth(MD+TVS) 19. SirectionalSurvey I 20. Depth where SSSV set I 21. Thickness of Permafrost
9397'MD 9386'TVD 8945'MD 8934'TVD YES~] NO [] 2079 feetMD 1642'
22. Type Electric or Other Logs Run
DIL/BHCS/GR, PML/ML/MLL, LL3, FDC, SNP/GR, CST
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
See 8,ttached sheet
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) L'VJ~ TVDss SIZE DEPTH SET (MD) PACKER SET (MD)
Prudhoe Oil Pool Top: 871-~-' 8657' ' ~=2~7/8'' 2038'-8496' 8380'
Bottom: 8887' 8834" 2-7/8" x 4-iL/2" Thermocz.se 2038
8710'-8750' BKB (8657'-8697' TVDss) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
8750'-8760' BKB (.8697'-8707' TVDss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
8760'-8766' BKB (8707'-8713' TVDss)
8766'-8?94' BKB (8713'-8741' TVDss)
8794'-8822' BKB (8741'-8769' TVDsS)
8822'-8887' BKB (8769'-8834' TVDss)
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
7/7/72 Flowing
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE GA~)O~LRATIO
7/7-13/72 49.04 TEST PERIOD I1~ 7442 5984 --
Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (cor'r)
PresSee Attachment 24-HOUR RATE ~ ~ee Attachm~_~nt None 26.3
28. CORE DAIA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEIVED
JUN 2 2 t98
Alaska Oil & Gas Cons, 6ommissio
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29.
GEOLOGIC MARKERS
NAME
MEAS. DEPTH
Top Sag R. SST.
Shublik
Sadlerochit
BKB
8594'
8632'
8708'
30.
FORMATION TESTS
Include interval tested, p~'essure data, all fluids recovered and graviw,
._
TRUE VERT. DEPTH GOR, and time of each phase.
31. LIST OF ATTACHMENTS
Subsea
8542'
8580'
8656'
32. I hereby certi'fy that the foregoing is true and correct to the best of my knowledge
~% ~/~,~ ~ ~.~ .... ) District Petroleum Enqineer [~/~,/~//
t O~'" A%'igned...._,,4'J.~.~./' ~_.....:../.......~..~.'"~_..._~/;~_ Title ...... Cate
1/
L/ INSTRUCTIONS
General' This form is designed for submitting a cornplete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, I<B, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing 'tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
Form 10-407
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
'ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
June 21, 1984
Alaska Oil & Gas Conservation Conm~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Gentlemen:
Mr. C. V. Chatterton
Well M-1 (43-01-11-12) PBU
Enclosed, in duplicate, are the following forms for the
above-named well.
1. Form 10-407, O:mpletion Report;
2. Form 10-403, Sundry Notice and Reports on Wells;
3. Form 10-404, Monthly Report of Drilling and Workovers.
GJP/~/pjw
Enclosures
cc: J. D. Hartz
Well File #17
Yours very truly,
District Petroleum Engineer
RF..crc V £D
JUN 2 219 4,
Alaska Oil & Gas Cons, commission
Anchora~
STATE OF ALASKA
ALASKA (~'" AND GAS CONSERVATION CO/'MISSION
SUNDRY N TICES AND REPORTS JN WELLS
1. DRILLING WELL []
COMPLETED WE L L 1~3
OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum ~any 69-78
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20042
4. Location of Well
At Surface:
458' WEL, 1998' NSL, Sec. 1, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 42.76' AMSL
6. Lease Designation and Serial No.
ADL 28260
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
M-1 (43-01-11-12) PBU
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Welt [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Duplicate)
Altering Casing
[] Abandonment
[] Other
13. Describe Proposed or Completed Operations (Clearly state alt pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following additional intervals were perforated May 26, 1984, using Schlumberger
1-11/16" Hyperdome guns at 4 s.p.f.
A lubricator was installed and tested to 3500 psi on all well work.
8710'-8750' BKB (Ref. BHCS/GR, 8-24-69)
8760'-8766' BKB (. " )
8794'-8822' BKB (. " )
An SSSV was set and tested in the ball valve nipple at 2079'.
RIEC[IVE, D
JUN 2 2 ]984
i~/g.nI hereby certify that the foregoing is true and correct to the best of my knowledge.
ed /~/'~ ~ ,4~ Title District Petroleum Engineer
,,. The sPaF~/elow for Commission use
Condit~r/of Approval, if any:
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAG E, ALASKA 99502-0612
June 21, 1984
Alaska Oil & Gas Conservation Co~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Gent le~n:
Mr. C. V. Chatterton
Well M-1 (43-01-11-12) PBU
Enclosed, in duplicate, are the following forms for the
above-named well.
1. Form 10-407, Cc~letion Report;
2. Form 10-403, Sundry Notice and Reports on Wells;
3. Form 10-404, Monthly Report of Drilling and Workovers.
Enclosures
cc: J. D. Hartz
Well File #17
Yours very truly,
G. 'J. Pli~
Petroleum Engineer
RECE VEE)
Alaska 01% & 6~s Cons, Commission
STATE OF ALASKA
ALASKA 9" AND GAS CONSERVATION CO~""~ISSION
MONTHLY REPORTi.,l: DRILLING AND WORI,,JVER OPERATIONS
· Drilling well [] Workover operation []
2. Name of operator 7. Permit No.
Sohio Alaska Petroleum Company 69-78
3. Address 8. APl NumDer
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20042
4. Location of Well
at surface
458' WEL,
1998' NSL, Sec. 1, TllN, R12E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 42.76' AMSL
I6. Lease Designation and Serial No.
APT., ~R~60
For the Month of .
9. Unit or Lease Name
Prudhoe Bav Unit
10. Well No.
M-1 (43-01-11-12) PBU
1 1. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
13. Casing or liner run and quantities of cement, results of pressure tests
14. Coring resume and brief description
15. Logs run and depth where run
RECEIVED
6. DST data, perforating data, shows of H2S, miscellaneous data
See Attached
J U N 2 2 984
Alaska Oil & (~as C~,;s g0mrnJssio~
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~._ _ ~-2 District Petroleum Engineer
D /f~,~ / I-I-~')(' TITLE .......... DATE
/ -- , , ,,
NOTE--R~(I:)6r, on this form is required 15~/ei~h calendar month, regardless of the status of operations, and must be file~:l in'duplicate with the
Alaska
Oil and C~ Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10~04 Submit in duplicate
Rev. 7-1-80
WRT.T, M-1 (43-01-11-12)
Casing Size
Weight
Grade Depth Set(MD) Hole Size
Amount Pulled
20"
94#
H-40 94 ' 26"
108 sx Peammfrost
13 3/8" 61# J-55 928' 17%"
9 5/8"
47# N-80 4087 ' 12¼"
1240 sx Permafrost
1405 sx G; 360 sx at 110'
,,
29#
N-SO 9366 ' 8%"
600 sx ~G/salt; 390 sx G/gel
1922'
1,
29#
N-80 1922' patchback
350 sx Fondu - Fly Ash Cement
i.' WF~.T. M-1 (43-01-11-12)
FORMATION TEST RECORD
0110-0600 hrs.
0110-1900 hrs.
1430-2000 hrs.
1930-0630 hrs.
2215-2240 hrs.
2250-0030 hrs.
0215-0445 hrs.
0723-1400 hrs.
1400-2000 hrs.
0900-1130 hrs.
1410-1540 hrs.
July 7, 1972
July 7, 1972
July 8, 1972
July 9, 1972
July 11, 1972
July 12, 1972
July 12, 1972
July 12, 1972
July 12, 1972
July 13, 1972
July 13, 1972
Flow A 3" choke WHFP 144 psig 3600 b/d
Flow A1 3" choke WHFP 200 psig 3500 b/d
Flow B1 3" choke WHFP 234 psig 4900 b/d
Flow C1 3" choke WHFP 257 psig 5100 b/d
Flow C2 Flo~-~ter Survey produced 17 bbls.
Flow C3 Flo%m~ter Survey produced 127 bbls.
Flow C4 Flo%meter Survey produced 418 bbls.
Flow C5 33/64 choke WHFP 1240 psig 2500 b/d
Flow C6 54/64 choke I~HFP 669 psig 4450 b/d
Flow C7 Flowmet~ Survey produced 406 bbls'.
Stzrface Safety Valve Tests produced 193 bbls.
RECEIVED
J U N 2 2 19 4
Alaska Oil & Gas Cons. Commission
Anchorage
I~ERFORATING DATA - Well M-1 (43-01-11-12) PBU
May 26, 1984:
Rigged up Schlumberger and perforated the following additional
intervals using 1-11/16" Hyperdome guns at 4 spf:
8710'-8750' BKB (Ref. BHCS/GR, 8/24/69)
8760'-8766' BKB ( " )
8794'-8822' BKB ( " )
Put well on production.
June 18, 1984:
Set and tested SSSVin ball valve nipple at 2079'
Well on produc%ion.
RF. CEIV D
JUN 2 2 ]984
Alaska Oil & Gas Coils. Commission
SOHIO ALASKA PETROLEUM COMPANY
3111 "C" STREET,
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502-0612
May 16, 1984
Alaska Oil & Gas Conservation Cou~ssion
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Wells M-l, M-14, R-2, R-7 PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our proposals to perforate
additional intervals in these wells.
Enclosures
cc: J. D. Hartz
Geology
Well File 417
Yours very truly,
~ ~istrict Petroleum Engineer
R CEI VED
Alaska
Oil
&A Gas Cons.
nchorage
STATE OF ALASKA
ALASKA ¢ ", AND GAS CONSERVATION C(~' "MISSION
SUNDRY I ¢TICE$ AND REPORTS, ,,,}N WELLS
1. DRILLING WELL [] COMPLETED WELL ~ ...,,.
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 69-78
3. Address -.. 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50- 029-20042
4. Location of Well
At Surface:
458' WEL, 1998' NSL, Sec.
5. Elevation in feet (indicate KB, DF, etc.)
~BE = 41.23' AMSL
12.
1, TllN, R12E, UPM
6. Lease Designation and Serial No.
ADL 28260
OTHER []
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
M-1 (43-01-11-12) PBU
1 1. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit in Triplicate) (Submit in Duplicate)
Perforate ~ Alter Casing [] Perforations []
Stimulate [] Abandon [] Stimulation []
Repair Well [] Change Plans [] Repairs Made []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
Altering Casing []
Abandonment []
Other []
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following additional intervals will be perforated May/June, 1984, using
Schlumberger 2-1/8" IIyperdomes at 4 s.p.f.
A lubricator will be installed and tested to 3500 psi for all well work.
8710'-8750' BKB (Ref. BHCS/GR, 8-24-69)
8760'-8766' BKB ( " )
8794'-8822' BKB ( " )
!
An SSSV will be set and tested in the ball valve nipple at 207,9 R E C E I VE D
Subsequent Work Reported
MaY 8 ISS/
Alaska Oil & Gas Cons. Commission
1,~4~.1 hereby certify that the foregoing is true and correct to the best of my knowledge.
L eer
~l - /I '~'" " : . I [I //
The spac/~ ~elow for Commission use ' IJ
II
Conditip~ of Approval, if any:
Approved
V
R~tUrn~d
Date
/
Approved by
BT' LOflNIE C. SEITfl
By Order of
COMMISSIONER the Commission
Form 10403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO PETROLEUM COMPANY
;
Division of Sohio Natural Resources C~mpany
SOHIO--BP ALASKA PRODUCTION DIVISION
TO:
SFO/UNIT/STATE
(-Marathon)
REFERENCE:
Mobil .
BF.!? ...
SFO.,
.....
ii j .i _
, · i i i
. tl -
i ~ ill
I i i i i i --
i i iii ~ --
ANCHORAGE, A
TELEPHONE (9071
MAIL: POUCH
ANCHORAGE, ALA
9/26/80
SOHIO FINAL CASED HOLE DATA
L//The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
C-7 Spinner 8/11/80 #1
D-5 Flowmeter 7/15/80 #1
D-8 Spinner 8/13/80 #1
D-9 TDT-M 7/18/80 #1
GC-3D Collar Log 8/7/80 #1
: Spinner 8/18/80 ~ #1
" EPL 8/17/80 #1
X-2 EPL 8/21/80 #1
X-9 EPL 7/27/80 #1
X-9 EPL 7/31/80 " #2
Y-6 CCL 8/1/80 #1
5"
5"
5"
5'~
l"/2"/5"
2"/5"
11
Carol Krieter
Well Records
SOHIO PETROLEUM COMPANY
-~"~ ~ r",-~ ANCHORAGE ALASKA
Division of Sohio Natural Re~urces Company ~'I ''~::"'~ '
' [---[~2 G'7(~HONE (907)265-0000
~ '- <:;'F" 7 .r,~--M~IL: POUCH 6-612
SOHIO-BP ALASKA PRODUCTIONDIVISlON ~ :~ ' ..... ~- ~ ~.'~'.~hO~AGE, ALASKA 99502
· o: . ~ .........
SFO/~IT /STATE ~mtba , , ..... 9/3/80
~ohil ......
~iltips ~ , .
BPAE ........
REFERENCE:
/,
#333
~ SFO/UNIT/STATE:
~ (-Marathon)
Sohio Data
.
,. The following material is being submitted herewith. Please acknowledge receipt by signing a
"~~cTopy of this letter and returning it to this office:-
...... Bottom-Hole Pressure Data Form & Survey 7/28/80
" " " " " " 8/11/80
" " " " " " 8/17/80
L:i " " " " " " " 8/11/80
" " " " " " 8/8/80
(Dressc
(OD)
(So)
(Otis)
(.Sen)
Carol K'r±~ter
Well Records
.
19
ALASKA OiL AND GAS CONSERVATION COMMISSION
Hoyle H. Hamilton~
Chairman/Commissi6~'
Thru: Lonnie C. Smith y
Commissioner
Bobby Foster~?''
Petroleum Inspector
August 19, 1980
Witness Retest of SSSV
on Sohio's M-1.
Monday August 11, 1980
~hile standing by to witness the test of the SSSV on Arco's
W.G.I. ~1 I contacted Mr. Gordon Winslett, Sohio's field produc-
tion supervisor, concerning the SSSV in M-1 that had failed two
previous tests. Mr. Winslett informed me that valve was ready to
be retested.
I met Bob Pressley, production foreman at the well and the valve
was tested. The valve tested OK as the attached field test
report shows.
In summary, I witnessed the retest of Sohio's M-1 SSSV.
Of~rator
P!t/Lcc
T.Io.
~tJ.gh
I"LG
~1' ' 1""
I
I
I
i
J
1
I
I
SS SV
I '
/' I~)'] Fp
':OS..[~
!
I
I
.. J
1
i
' I
I
ALASKA OIL AND GAS CONSERVATION COMMISSION
Chairman/Commi s s i o n ~4
Thru: Lonnie C. Smith ~'
Commissioner
Petroleum Inspector
August 11,1980
Witness the retest of
Sohio's SSV B-9 and SSSV
M-l, Prudhoe Bay.
Saturday, August 2,1980: I trave~'d from Brinkeroff Rig 1 to
SohiO's "B-Pad and witnessed the retest on SSV B-9. I then
witnessed the attempt to retest SSSV M-1 which failed. I filled
out an A.O.G.C.C. safety valve test report for each well which
are attached.
In summary I witnessed the retest of SSV B-9 and SSSV M-1. I
filled out two A.O.G.C.C. safety valve test reports which are
attached.
Safety Valve Test <:'Date
co./~c.'
P~SSU~S
PSI
G
Operator ~_~,O ~ / ,~ Representative
t~o Well Pilot ' ' ~G SI ~N SSV
P1 c No. High Low TBG TBG CSG IP FP Test IP FP Test
.. ,
,.
,, .
, , ,
I ,
...... , . .......
....
, , ,. .............
, , , ,
',. '.' ',,,:~:,,;~'",i, ,,:~, ..~ ',,',,.,,;'i,,:,:,*;~,?L',,: ,;,,,';,'h';,w:_,'~,t,,,:,',~,','..,;,',,;',,l,' ',t:,,¥i,~ .,,,
, ....... , .
: "
..............
~, : , ,~. .....
.....
~ , .. .............
....
~ , ....
....
............
[ .....
...... .,
, , , ,
....... . .... , ,,
....... , ....
.
,.
.....
~ ~ , .........
......
, .....
........ , ........
i'.] , ' , ~- [,,,
Remarks: ~/07~ : 2Sr~ S~ ~ f)/ i , ..... '.." . ....
' ' l
~'~cc ~ '~ ~ 2 't~~, ~ ,, .. , ~....,
,::~ ~?~'E~ C I~;'', · .. ,~ C ~,'~.. ,.'"."'~?,,1.J ' ' ' ' , ~ /.,,...,....,~,.?,.~.. ,. /'7~:~.~
Inspectors 7~) _../~.,.,z.,, ~..- f~'~7.,..77 ? '3_..
Safety Valve Test ~ Date ~'~/7 ~, /~,~
co./~c. .~ ,'4 u5 / :-~ c - 3
PRESSURES- PSIG '
Operator ~.z~/ZS~ Representative ~?fl/f;L?:?,,w' ,.;5Z',/..3 .lz-'4"_z~??-- ,,
Well Pilot ~G SI . ~N SSV SSSV
Plt~oc No. High ~w TBG TBG CSG IP FP Test IP FP Test
.
, .
,,.
, ,
.
,
., ,
.
. ,
..
,
.
.
, ,
.
,
. . .. , ' , . ,
.... · .....
' ' , , , ' ; 'l
.
....
,
, , , . : . , , , ' , ~ : ' ,, ,
, , 4 , ,
.......
. , .....
,.. , ,
t , , '
,
.
......
c ,
.....
,
,..
, ,
,
. ·
, ,
................
, ,.
.......
, . , . ,
, ' ' I'
. . ,
.
,
.
.
,
.... : ....
,7,
Inspectors ~O~'.c~ :/"~"?/~0''~.,.' ~.
SOHIO-BP ALASKA PRODUCTION DIVISION
I
SOHIO PETROLEUM COMPAN~(''
Division of Sohio Natural Re~urces Comp,tny
I
:.;FO/UNIT/STATE
(-Marathon)
3111 "C"' STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
TO:
SFO/UNIT/STATE M.~rd~ --~ _~ -_- 4/24/80 fll14
·
·
.
REFERENCE: ,' f
I
. SOHIO CASED HOLE FINAL DATA:,.,
t : ," '
//The following mater al is being submitted herew't ,PI acknowledDe receipt by si~min§ a
L/ copy of ~his letter and returning it! to tht'i~ office:-
+ ~ .... ,
B-9 TDT-M ,, 3/23/80 ~2 5"
,,
.,
7/13/79 #1
2/29/80 #1
3/25/80 #1
3/16/80 #1
2/29/80 #~
2/25/80 #1
3/.12/80. #1
3/9-10/80 #1
3/iO-~l/SO #i
3/13-14/80 #1
12/25/79-1/23/80
3/25/80-4/12/80
3/4/80
5"
5"
B-13 Diff. Temp,
B-16 Perf. CCL
C-'15 Temp.
E-4 Spinner
H-7 Spinner
J-6 Spinner
Temp.
- CCL
M-6 CCL
M-7 CCL
X--~ Mudlo9
West Sak #1~ Mudlo9
FDC/CNL
SFO/~NIT/STATE: Y-6
11
5"
5"
5'~
5 ~!
5'~
5~! , ·
(State only)
(State only)
#1 2"
Well R&cords
· ,
RECEIVED
,,
f.?,.',~ ~"~, ,"., .
DATE /., i i,.~ .... ,,,
19
SOHIO PETROLEUM COMPANY
Division of Sohi~ Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
November 29, 1979
Alaska Oil & Gas Conservation Cc~ssion
3001 Porcupine Drive
Anchorage, Alaska 99502
Attn: Mr. H. H. Hamilton
Gentlemen:
Well M-1 (43-01-11-12)
Enclosed, in duplicate, is Form P-7, Completion Report
for the above-named well together with the Well History,
Casing Record, and Formation Test .Record.
This well has been shut in pending completion of surface
facilities.
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
I COM~
i K
J COMM"
J RES ENG
J 3 ENG
I 4 ENG
PRJ: ja
Enclosures
cc: Well File ~17
Geology
Yours very truly,
SOHIO PETROLEUM COMPANY
P. R. Judd
District Drilling Engineer
Form P--7
SUBMIT IN DUPLf~ E*
STATE OF ALASKA (see other In-
structions on
reverse side)
OIL AND GAS CONSERVATION COMMITTEE
WELL COMPLETION OR RECOMPLETION REPORT AND LOG*
la. TYPE OF WELL: OIL GAS r--I
WELL[] WELLL_J DRY[] Other
b. TYPE OF COMPLETION:
NEW ~ WORK DEEP- PLUG ~ DIFF.
WELLL~J OVER [] EN [] BACKI I RESER.[] Other
2. NAME OF OPERATOR
Sohio Petroleum Cc~pany, Div. of Sohio Natural Resources Co.
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)*
Atsurface 1999' NSL, 458' WEL, Sec. 1, TllN, R12E, UPM
At top prod. interval reported below
2032' NSL, 678' WEL, Sec. 1, TllN, R12E, UPM
At total depth
2038' NSL, 677' WEL, Sec. 1, TllN, R12E, UPM
7/21/69 [14. DATE T.D. REACHED
5. APl NUMERICAL CODE
50-029-20042
6. LEASE DESIGNATION AND SERIAL NO.
ADL 28260
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
9. W~J_L NO.
~i'~ (~3-01-11-12)
lO,El. ELD AND POOL, OR WILDCAT
Prudhoe Bay,Prudhoe Oil Ps
1. SEC., T., R., M., (8OTTOM HOLE
OBJECTIVE)
Sec. 1, TllN, R12E, UPM
12. PERMIT NO.
69-78
13. DATE SPUDDED
8/24/69
18. TOTAL DEPTH, MD&TVD 119. PLUG BACK I DEPTH
9397'MD 9386'TVD 18945'MD
22. PRODUCING INTERVAL(S), OF THIS COMPLETION -TOP, BOTTOM, NAME (MD & TVD)*
Prudhoe Oil Pool - Top: 8750' MD 8739'TVD
Bottc~: 8887' MD 8876'TVD
24. TYPE ELECTRIC AND OTHER LOGS RUN
DIL, BHCS/GR, PML/ML/MT.T.,
25.
CASING SIZE WEIGHT, LB/FT.
See
15. DATE COMP, SUSP, OR ABAND. 116. ELEVATIONS (DF RKB, RT, GR, ET~)-*.,.~/17. ELEV CASINGHEAD
· 10/29/79 '1 KBR = 42.76' AMSi.,/.q~, ])1 25.57' AMSI',
MD & TVDI20. IF MULTIPLE COMPL _ IN~EELV~LS DR LLED BY
I HOW MANY* " 21. ROTARY TOOLS .... CABLE TOOL~
8934 'TVD I Total
23. WAS DIRECTIONAL
SURVEY MADE
LL3, FDC,SNP/GR, CST
CASING RECORD (Report all strings set In well)
DEPTH SET (MD) HOLE SIZE
Yes
CEMENTING RECORD
AMOUNT PULLED
26.
LINER RECORD
TOP (MD) BOTTOM (MD) SACKS CEMENT*
28. PERFORATIONS OPEN TO PRODUCTION (Interval, size and number)
~8750-8760'BKB @ 4spf 0.5', .,:?-, ~. ',',~,:
'?8766-8794'BKB @ 4spf 0.5"
'~8804-8818'BKB @ 4spf 0.5" "
.f8822-8887'BKB @ 4spf 0.5" ~/' .... ; .....
27.
SCREEN (MD) SIZE
12 7/8"
2 7l/8"X4 1/:
.TUBING RECORD
DEPTH SET (MD) I PACKER SET (MD)
I
"Thermocase 2 ~
29. ACID, SHOT, FRACTURE, CEMENT~Q~E~,~E.T~CN
,~ ~., . ." . ~;-'~
DEPTH INTERVAL (MD) I AMOUNT AND I~ID~'0F~ M/~E~IAL OSED,
I
Well History, Casing Record, Formation Test Record
33. I hereby certify that the ~~n'~attached~l~,~/ information is complete and correct as determined from all available records.
SIGNED ~ TITLE District Drilling Engineer
P./R. J~cI" -
*(See instructions and Spaces for Additional Data on Reverse Side)
DATE
t,,,,. ,,¥': ,-,.or
/':'"ii ....... 7/7/;~.--~ I Flowing Ishut''n) Shut in
'<~=E,O~:" .OURS TESTED ICHOKES,ZE I PRO~'N~OR O,L-BB,. GAS-MCF. WATER-BBL. IGAS-O,'RAT,O
7/7- 3/72 I I I - I . oo
FLOWTUBING CASING PRESSURE ICALCULATED oIL-BBL. GAS--MCF, WATER-BBL. IOILGRAVlTY"API (CORR.)
PRESS' See atta"hment 124'IH°UR R~ZE I See attaceent I None I 26'3
31. DISPOSITION OF GAS (Sold, used for fuel, vented, etc.) I TEST WITNESSED BY
Flared
I
32. LIST OF ATTACHMENTS
INSTRUCTIONS
General- This form is designed for submitting a complete and correct well completion report and log on all types of
lands and leases in Alaska.
Item: 16' Indicate which elevation is used as reference (where not otherwise shown) fol- depth measurements given in
other spaces on this form and in any attachments.
Items 20, and 22' If this well is Completed for separate production from more than one interval zone (multiple com-
pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s)
(if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified,
for each additional interval to be separately produced, showing the additional data pertinent to such interval.
Item 26: "Sacks Cement"' Attached supplemental records for this well should show the details of any multiple stage
cementing and the location of the cementing tool.
Item 28' Submit a separate completion report on this form for each interval to be separately produced. (See instruction
for items 20 and 22 above).
34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, 35. GEOLOGIC MARKERS
WATER AND MUD
NAME
MEAS. DEPTH TRUE VERT. DEPT
See attachment
BKB Subsea
Top Sag R. SST. 8594' 8542'
Shublik 8632 ' 8580 '
Sadlerochit 8708' 8656'
36. CORE DATA, ATTACH BRIEF DESCRIPTIONS OF LITHOLOGY, POROS'ITY, FRACTURES, APPARENT DIPS
AND DETECTED SHOWS OF OIL, GAS OR WATER.
.
W~T.T. M-1 (43-01-11-12)
DRTT.LTNG
July, 1969
Moved from BP 11-10-14. Set 20" conductor at 94' with 108 sks cement.
Rigged up. Spudded at 1'015 hrs., July 21, 1969. Drilled 17 1/2" hole to
979'. Conditioned for casing. Ran and c~ented 13 3/8" casing at 928'
with 1240 sks Pen~afrost cement. Nippled up. Drilled out. Drilled 12 1/4"
hole to 4095'.
August, 1969
Logged well. Drilled to 4105'. Ran and cemented 9 5/8" casing at 4087' with
1405 sks Class G cement. Nippled up. Drilled 8 1/2" hole to 9821'. Ran
directional surveys at 4300' and 6941'. Logged well. Drilled 8 1/2" hole
to. 9397'. Logged well. Conditioned ~hole for casing. Ran and cemented 7"
casin~ at 9366' with 600 sks of salt saturated cement and 390 sks of gel
cement. Nippled up. Cleaned out to float collar and suspended as per Sundry
Notice Application of August 20. Rig released at 0600 hours, August 30, 1969.
FLC~ST~G
April, 1970
~leted rigging up. The 7" casing was partially collapsed at the following
inte_rvals: 110', 236', 371', 415', 500', and 631'. The damaged sections were
milled out and the casin~ was inspected with logs. The casing was removed
down to 1922'. During the milling operations the 9 5/8" casing was damaged at
110'. The9 5/8" .casing was cemented to the surface with 360 sks of cement.
Excess cement was cleaned out and a new string of 7" casing was run with a
casing patch. ' After matching to the cut off casing~ at 1922', the casing was
cemented to the surface with 350 sks csment. Drilled bridge plug at 2500'
and cleaned out to 3270'. Cleaned out to 9313'.
May, 1970
Ran G~CBL/CCL. Perforated 9055'-9060'. Carried out DST #1. Conditioned mud.
Set..bridge plug at 9040'. · Set production packer at 8950'. Ran tubing, made
'up and tested wellhead. Perforated 9000' -9008 ' and 8994 '-9002 '. Flow tested
well. Perforated 8966'-8982'. Flow tested well. Killed well. Pulled tubing.
Recovered production packer. Set bridge plug at 8945'. Ran open ended tubing
with bell nipple to 8766 '. Perforated 8822 ' -8887 '. Flow tested well. Re-
perforated 8850'-8882 '. Continued testing. Reperforated 8822 '-8854 '. Continued
testing. Killed well. Pulled tubing. Set production packer at 8710' Ran
tubing. Made up and tested wellhead. Washed in tubing. Flowed well Lriefly
to burning pit. Set plug in profile above the sliding sleeve. Bled off all
pressure from tubing. Released rig at 2200 hours, May 31, 1970.
.,],
FLOWI~STING
July, 1972
Recovered DW plug from 2 7/8" tubing at 8585' BKB. Ran Pressure/Temperature
Survey. Flowed well to clean up (A) Flowed well to check productivity (Al)
Reperforated 8824'-8887' BKB. Flow tested (B1) PBU. Perforated 8750'-8760'
BKB, 8766'-8794' BKB, 8804'-8818' BKB. Flow tested (Cl) PBU. Ran Pressure/
Temperature Survey. Flowed to evaluate Crelad flow meter (C2, C3 and C4)
· Flow tes%ed at two rates (C5 and C6) PBU. Repeated evaluation of Crelad flow
meter (C7). Flowed to test surface safety valves. Set I~ plug in 2 7/8" tubing
at 8582' BKB. Bled tubing to zero. Installed 4" back pressure valve in tubing
hanger.
COMPLETION
October, 1979
Accepted rig at 0001 hours, October 15, 1979. Installed and tested BOPE. Killed
well with 9.6 ppg. NaC1. Attempted to pull DW plug, lost wireline tools; fished
and partially recovered. Pulled 2 7/8" tubing, recovered wireline and DWplug.
Cleaned out well to 8651'o Pulled packer. Cleaned out to 8945'. Set production
packer at 8380'° Ran 196 jts. 2 7/8" 6.5% N-80 CS Hydril tubing with 70 jts.
2 7/8" x 4 1/2" Thermocase on top topacker at 8380'. Landed tubing withball
valve nipple .at 2079' and bottom of Thermocase at 2038'. Installed and tested
tree. Displaced tubing withdiesel, tested tubing annulus to 1500 psi. Released
rig at 0300 hours, October 29, 1979.
Casing Size
Weight
Grade
_WELL M-1 (43-01-11-12)
_
Depth Set(MD) Hole Size
Cementing Record
Amount Pulled
201'
13 3/8-
9 5/8"
11
1,
94#
61#
47#
29#
29#
H-40
J-55
N-80
N-80
N-80
94'
928 '
4087'
9366'
1922 '
26"
17½"
8½"
patchback
108 sxPermafrost
1240 sxPermafrost
1405 sx G; 360 sx at 110'
600 sx G/salt; 390 sx G/gel
350 sxFondu - Fly Ash Cement
1922'
WEI.T. M-1 (43-01-11-12)
FORMATION TEST RECORD
0110-0600 hrs.
0110-1900hrs.
1430-2000 hrs.
1930-0630hrs.
2215-2240 hrs.
2250-0030 hrs.
0215-0445 hrs.
0723-1400 hrs.
1400-2000hrs.
0900-1130 hrs.
1410-1540 hrs.
,
July 7, 1972
July 7, 1972
July 8, 1972
July 9, 1972
July ll, 1972
July l2, 1972
July 12, 1972
July 12, 1972
July 12, 1972
July 13, 1972
July 13, 1972
Flow A 3" choke WHFP 144 psig 3600 b/d
Flow A1 3" choke WHFP 200 psig 3500 b/d
Flow B1 3" choke WHFP 234 psig 4900 b/d
Flow Cl 3" choke WHFP 257 psig 5100 b/d
Flow C2 Flowmeter Survey produced 17 bbls.
Flow C3 Flowmeter Survey produced 127 bbls.
Flow C4 Flo~meter Survey produced 418 bbls.
Flow C5 33/64 choke ¥~HFP 1240 psig 2500 b/d
Flow C6 54/64 choke ~ 669 psig4450 b/d
Flow C7 Flowmeter Survey produced 406 bbls.
Surface Safety Valve Tests produced 193 bbls.
SOHIO PETROLEUM COMPANY
Division of Sohi~ Natural Resources Company
SOHIO--BP ALASKA PRODUCTION DIVISION
November 6, 1979
Alaska Oil & Gas Conservation Ccamtission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
~ .................. ~I~F~ 3111 "C" STREET
" I ~--' .-'~ ~, ,~ ,~ '~
' (,'~ ,'~ ', r' ,,~
i '-'IC'?'-'/~'" ~;'~-~:~! TELEPHONE (9O7) 265-0000
~ ' MAIL: POUCH 6-612
CONF~R:
Gentlemen:
Well M-1 (43-01-11-12)
Enclosed, in duplicate, is Form 10-404, Monthly Report
of Drilling and Workover Operations, for the above-
named well for the month of October, 1979.
PRJ: ja
Enclosur~es
cc: Well File ~17
Yours very truly,
SOHIO PETROLEUM COMPANY
P. R. Judd
District Drilling Engineer
Form No. 10-404 ~ SUBMIT IN DUPLICATE
REV. 3-1-70
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. APl NUMERICAL CODE
50-029-20042
6. LEASE DESIGNATION AND SERIAL NO.
APL 28260
2. NAME OF OPERATOR 8. UNIT FARM OR LEASE NAME
Sohio Petroleum Company, Div. Sohio Natural Resources Co. Prudhoe Bay Unit
3. ADDRESS OF OPERATOR 9. WELL NO.
Pouch 6-612, Anchorag'e, A.laska 99502 M-1 (43-01-11-12)
4. LOCATION OF WELL
At surface:
2002' NSL, 460' WEL, Sec. 1, TllN, R12E, UPM
10. FIELD AND POOL, OR WILDCAT
Prudhoe BaY r Prudhoe Oil Pool
11. SEC. T. R. M. (BOTTOM HOLE OBJECTIVE)
Sec. 1, TllN, R12E, U~M
12. PERMIT NO.
69-78
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET AND VOLUMES USED~ PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
October, 1979
Accepted rig at 0001 hours, 10/15/79. Installed and tested BOPE. Killed~ll/ with
9.6 ppg. NEC1. Att~pted to pull DWplug, lost wireline tools; fished and partially
recovered. Pulled 2 7/8" tubing, recovered wireline and DW plug. Cleaned out well
to 8651'. Pul!edpacker. Cleaned out to 8945'. Set production packer at 8380'.
Ran 196 jts. 2 7/8" 6.5# N-80 CS Hydril tubing with 70 jts. 2 7/8" x 4 1/2" Thermocase
on top to packer at 8380'. Landed tubing with bal!~alve nipple at 2079' and bottc~n
of Thermocase at 2038'. Installed and tested treeJ Displaced tubing with diesel,
tested tubing annulus to 1500 psi' Released rig at 0300 hours, 10/29/79.
DistriCt Drilling Engineer
TITLE DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
April 4, 1979
3111 "C" STREE'IJ .....I-.- ~ ~; ;'~.-'_~,~;-~}~
TELEPHONE (907)265l¥6-~-~.' ~'~i-~ ..... j
POUCH ,, .....
MAIL: 1A~-I '~, ,.'.'.r:'.~.._!6-6' .... x
ANCHORAGE. ALASK 50~ .... ~
t..-~ ..... _--. .... ii
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. Hoyle H. Hamilton
Gentlemen:
Well M-1 (43-01-11-12)
Enclosed, in triplicate, is Form 10-403, Sundry Notices
and Reports on Wells, for the above-named well. This
notice outlines our proposal to re-enter the well and
re-complete for production.
Very truly yours,
SOHIO PETROL~ COMPANY
P. R. Judd
District Drilling Engineer
PRJ: ja
Enclosures
cc: Well File ~17
CC~ 7901
Form 10-403
REV. 1--1 (~-73
Submit "Intentions" in Triplicate ,It"
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--" for such proposals.)
WELLI ! OTHER
2. NAME OF OPERATOR Sohio Pe~r(~)]_e~]Q! Co/-Qps.ny
Division of Sohio Natural Resources, Inc.
3. ADDRESS OF OPERATOR
Pouch 6-612, Anchorage, Alaska 99502
4. LOCATION OF WELL
At surface
460' WEL, 2002' NSL, Sec. 1, TllN, R12E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
KBE 42.76' AMSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ~ PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
· SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
(Other) Re-complete well
CONFIDENTIAL
5. APl NUMERICAL CODE
50-029-20042
6. LEASE DESIGNATION AND SERIAL NO.
ADT, 28260
7. IF INDIAN, ALLOTTEE OR TRIBE NAk4E
8. UNIT, FARM OR LEASE NAME
Prudhoe Bay Unit
:9. WELL NO.
M-1 (43-01-11-12)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe Oil Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 1, TllN, Ri2E, UPM
12. PERMIT NO.
69-78
~ort, or Other Data
SUBSEQUENT REPORT OF:
WATER SHUT-OFF 3 REPAIRING WELL
FRACTURE TREATMENT ~ ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, includina estimated date of
starting any proposed work.
We propose to re-enter the above well approximately June 5, 1979 to re-complete
the well in preparation for production .from the Prud/]oe Oil Pool, as per the
following program. Ia:'"
1) Kill the well, remove the 'test string, cleanout to PBTD.
2) Run 2 7/8" 6~55 L-80 tubing with 1950'+ of 4 1/2" x 2 7/8". thermo-
case on top, and set production packer at 8400'+. A subsurface
safety valve with dual control lines .will be placed at 2000 '+
and non-freezing fluids, will be left through the permafrost
interval.
3) Install and test Xmas tree.
4) Suspend well for production from present perforated interval
(8750'-8887') until tie in of flow line is complet
TITLE District Drilling Enginee[ DATE-
APPROVED BY I'
CONDITIONS OF APPROVAL, IF ANY:
TITLE
See Instructions On Reverse Side
Approved
BP ALASKA INC. ;;C~'IB-Oc~4~IT3RTEgET
August 9, 1972 i/
State of Alaska ~F~~~
~ - .
Depar~ent of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
~chorage, Alaska 99504
Attention: Mr. Homer L. Burrell, Director
Gentlemen:
We refer to your letter dated August 8, 1972 expressing obvious
concern on the minimal information contained in the Form P-4
report submitted on our well Put River M-l, Prudhoe Oil Pool.
We have thoroughly investigated this matter and find a wealth
of information contained in the Form P-7 report submitted to
you under the same covering letter as the above P-4 report.
With the intention of not being repetitive, we omitted to include
the same detail in the other reports submitted at that time, but
we are happy and willing to provide this data in any form you may
require it.
It is of course our intention to file the detailed report as has
been agreed under A.S. 38. This should be issued Within the next
four to five weeks, but if'in the meantime you require any further
information, we shall be glad to help.
Sincerely,
Manager (Operations)
August 8, 1972
Re: Put River M-I Prudhoe Ol Ipool
BP Alaska Inc.
A~tn: A. K. I~ard
Manager of Operations
P.O. Box 4-1579
Anchorage,, Alaska, 9950,3
Gent I emen,:
We have rev'le~e,d the, ,a,?tac~md Form P-4 report submitted on the subject well
for July tg'72. ,After .revilewtng the. l,co~plete Information shown on this, report
and having knowledge of the operat',t, ons undertaken, we wonder if there
:someth Ing e i se you wou I d I i ke to tel I 'u:s on, th I s report.
S ! ncere t ¥,,
t~r L. ~urretl
D t ,'rector
Attachment
BP ALASKA INC.
P.O. BOX 4-1379
3111 - C - STREET
ANCHORAGE. ALASKA 99503
TELEPHONE {907) 279-0644
August 2, 1972
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell, Director
Gentlemen:
Well Number ~M-1 .(0.1-11712)
Enclosed please find the following documents:
Ae
Well Completion or Recompletion Report and Log, Form P-7,
in duplicate.
2. Sundry Notices and Reports on Wells, Form P-3, in triplicate.
3. Producers Report of Gas Production, Form G-7, in duplicate.
4., Monthly Production and Injection Report, Form 10-405,
in duplicate. -
5,
Monthly Report of Drilling and Workover Operations,
Form P-4, in duplicate.
(~Qo JCG:vjp
Very truly yours,
A. K. Howard
Manager (Operations)
Enclosures
cc: Operations Coordinator, New York
,
STATE OF ALASKA
OIL AND GAS CONSERVATION
./~
SUBMIT IN DU,,LIC.ATE*
( Se. other
st ructions on
reverse sitie
COMMITTEE
II I i i i
WELL cOMPLETION OR RECOMPLETION REPORT AND LOG*
i". TYPE OF W~LL: OH, [~WELLGAS ~ DRY ~ Other
WELL
b. TYPE OF COMPLETION:
NEW [~OVERWOgK' ~ ENDEEP'[] PLUGBACK ~ DIF'.gESVR. ~ Othe, OBSERVATION
~VEI. L
2. N&ME OF OPERATOR
BP Alaska Inc.
3. ADDRESS OF OPERATOR
P. 0. Box 4-1379, Anchorage, Alaska 99509
~. LOC^TION 0r WELL (Report location clearly and in accordance with any State requirements)*
At surface 458' WEL, 1998' NSL, Sec. 1, TllN, R12E, UPM
At top prod. interval reported below 668' WEL, 2031' NSL
At total depth 677' I~L, 2037' NSL
~5. API NLrlViE1R/CAL CODE
50-029 -20042
6. LEA~E D~TGNATION A.ND SERIAl, NO.
ADL-28260
'7, IF INDIA_N, AJ-J-~)~E OR TRIBE NANLE
8. UNIT,FA.P, AVI OR LEJ~SE NAME
Put River
9. WELL NO.
~-1 (01-n-z2)
i0. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe 0tl
n. SEC., T., R.,M., (BovroM HOnE Fool
OBJECTIVE)
Sec. 1, TllN, R12E
12. P]~qR~/IIT 1~0.
69-78
ELEVATIONS (Dr, RKB, RT, GR, ~I~C)*[I~. F_J-,E~. CASINGHEAD
28' AI.~SL
7-21-69 8-24-69 8-30-69 KBE 43' AMSL
18. TOTAL D~PTPI, 1VLD & TVD~lg. PLUG, B~CK MD & TVD~0. 0 ROTARY TOOLS CABI, E TOOLS
22. PRODUCING IXTE~VAL(S>, OF TI-IlS COMPI~ITIO[b~--TC~, BOTTOM, I~A1ViE 0VID AND ~/-O)* 2..2. WAS DIRECTIO'NAL
8750'-8760' 8766'-8794' 8804w-8818' 8872~-8887~ ~ Sadlarochit I SU~V~¥~AVE
(8739'-8749' 8755'-8783' 8793'-8807' 8811'-8876' TVD) ! Yes
$ , . ~ , ~ j
24. TYPE ELECTRIC AND OTHER LOGS RUN
c~slNG sIzs
~ 20:;
, ,,
GR/CCL for depth control while perforating.
_ ii ii i i , , 11
: CASING RECORD (Report a{1 strings set in well)
! WEIGH,T'iLB/FT' ~' "G~1R~DE t DEPTH~T I '( ~ ) I ~oL~ ~'i I o~,~=~,I~o RECO~ I ~°~
1240 sacks Pemafrost I ,
"6z:"I'ass I'' 92'8' "' 17~. sacks 68.5 sacks q
RECo~D ' !27. TUBING RE~OF~D
26.
LINER
* SIZE DEPTH SET (MD) PACI~Ei'% SET
28 PERVO.RATIONs QP~N TO PRODU'CT~ON'. iInt, erva! stze and number) ~9. ACID SH!D~,~1~A~CI'LrRE, CEaVIE:NT SQUE.~.Z~;. ETC.
'.8750'-8760' BKB 4 ehote/~oot ' , ~ ' L~ qt~ ," -- ~m~:"~bovM~az
8766'-8794' 3KB 2' ,ttyp~rJet I!:,1,~,'::~ ~ '
8804' -8818' BKB ' 1 , , ...... '
'h ~* ~ :'h ~"~. ~-.~ f"l !i?. [" ", / % -:' ' j~.
'., , ~ /,~ ~ ,,, ,, .,,,,., ~ ,.. ~
DW plug irt 2-7/8" tubing at 8582~ BKB t '"~?'~'~
30. PRODUCTION
~,~A~5~ST PI~ODUCTION [ I~QDUC~ION MEIII-IO'D (F1Owh~g'gas lif~' pumpIng-sizeand type Of pump)l~,lO~Ilrtg 1WELLST'ATUS (PrOducing Or0nut-in), S]['~.~t ir~
'DATE OF TI~%T, ~I-TOtfRS TES.TED ']CHO~XE SIZE [PROD'N FOR OIL--BEL. G~S~iV~CF. WATER-'B.IRL. [ GAS-OIL RATIO
7-13.. [ July/7 49.04 aa fever 1 ~'"~ ' L,7442 [5984 [ [ --
~-~--oW, ~JBING ' k~mG PRESSUR~ ALCI/LAT~D OIL--BBL. OAS--MCr. WAT~:_g~-BI~L. [OIL GRAVITY-Alii
Se~u~ve~:se. l See reverse. :i:. ~ :~..aoua RA~ ;[ See reverse ] See reverse[ Nonel ' w,T~ss~[ 26 .3
I 31. DISPOSITION Or GAS (80/'~, used for fuel, vented, etc.) [TEST , BY
Flared \
t
Sund~:y Notice~ Gas Production Report, Production and .Injection Report, ~k)nthly Report
33.1 hereb~ certif~Ahlt the foregoing and attached information is complete and correct as determined from all'~avatlable records
src~¢o,.l.~XA?~. v.~,~' Tm.E Manager (Operations) oAxg __~q.U.
\
*(See Instructions and Spaces for Additional Data on Reverse Side)
,/
General: This form is designed for submitting a complete and correct ,,,,-e!l completion report and leg on
all types of lands and leases in Alaska.
Item: 16: Indicate which elevation is used as reference (-where not otherwise shc,<.',a~, for depth n',e,~sure-
merits given in ether spaces on this form and
Items 20, ~nJ 22:: If this 'well is completed for separate ~)rccJuction ~ro,~ mo~e than ot~e ~n~erval zone
(mulliple completion), so state ~n item 20, and i~ ~te~ 72 show the p~c:]~c~:'(] interval, or ~nte~v~ls,
top(s), bottom(s) and name (s) (if any) for only the interv:~J ret)erred ir~ iiem 30 S~hrz~t a separate report
(page) on this form, adequately identified, for each additior~al i,~te~val to be separately prod~cert, show-
ing the a~itional data pertinent to such interval.
It~m2~: "Sacks Cement": Attached supplemental records for this-well should show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 2~: Submit a separate complelion re~rt on this form for each inierval to be separately produc~.
(~e instruction for items 20 and 22 above).
34. SUMMAItY OF FO{tMATI~N TES'~'S IN('LUDIN(; INTE!tVAL TF~STED. i. HESS~RE DATA ~ ~OVERI~' OF OIL GAS
35 G~GIC MARKm~
WA~ AND MUD
110-0600 Hrs., July 7 '72 Flow L 3'~ ~oke ~ 14~ psig 3600 b/d ~ ~,~s ~m,~ :~u~v~r. ~
..
.100-1900 Hrs., July 7 '72 FI~, A1 3~' ~oke ~C~W 200 psig 3500 b/d
430-2000 Hrs., July 8 '72 Flow BI 3" choke ~-~ 234 psig 4900 b/d
930-0630 Hrs., July 9 '72 Flow C1 3': choke ~,~ 257 psig 5100 b/d ~
215-2240 Hrs., J~y 11 '72 ~ow C2 Fl~eter Su~ey produced 17 bb!s.
250-0030 Hrs., July !2 '72 Flow C3 F!o~ter Su~ey produced 127 bb!s. ]
.
. . _ .
~ , · . , . , , ,-
215-0445 tirs., July 12 '72 Flow C4 Flo~eter Su~ey produced 418 bb!s.
-~Za ~500 ~ /d
72311400 Hrs., July 12 '72 Flow C5 33/64 choke ~ z~u ~ ~
400-2000 Hrs., July 12 '72 Flow C6 5~/64 M~oke ~-~ 669 4450 b/d
900-1130 Hrs., July 13 '72 Fi~ C7 Fl~meter Su~ey produced 406 bblm.
410-1540 Hrs., July 13 '72 Surface Safety Valve Tests Produced 193 bbls.
O[
1
O;
lZ
Form
REV. 9-38-6 9
Smbmit "Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE O'F ALASKA
OIL AND GAS CONSERVATION COMMI]q'EE
SUNDRY NOTIC'ES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or ~o decoen
Use "APPLICATION 'FOR i~ER~IT-L'' 'for such 'p~Zo~osals.)
1.
WELL WELL OTHER
2. NAME OF OPERATOR
BP Alaska Inc.
3. ADDRESS OF OPERATOR
P. O. Box 4-1379, Anchorage. Alaska
4. LOCATION OF '~VELL
99509
Ats~'~ce 458''WEL, 1998' NSL, Sec. 1, TllN, R12E, UPM
13. ELEVATIONS (Sliow whether DF, RT, GR, etc.
KBE 43" AMSL
t4. Check Appropriate Box To [ndi,cate Nature of NB.ti'ce, Re sort, or Other Data
5. API NU~iF_.RICAL CODE
50-029 -20042
6. LEA. SE DESIGNATION A_ND SERIAL NO.
_&DL-28260
7. IF IN-DiA-N, A.LLOT'rEE OR TRIBE N.ki~1E
8. UNIT, FA!R.M OR LEASE NAME
Put River
9. V;ELL NO.
BP M-1 (01-11-12)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay, Prudhoe 0il Pool
11. SEC., T., R., A~., (BOTTOM HOI_~ OBJECTIVE)
Sec. 1, TllN, R12E
!12. PEI:UVIIT NO.
69-78
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ] t PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE [ I ABANDONS
REPAIR WELL ~_~ CHANGE PLANS
(Other)
E~RSE0~E~T REPOaT O,:
ALTERING CASING
WATER SI'UT-OF' R~PAIRING W~LL __]
(Other) PE~O~T~NG ~D FLO~ TEST~NG~[
NOT~'. Report results of multiple completion on Well
o~npletion or Reeompletion Report and Log form.)
t5. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any
proposed work.
'Cqm. pleted 'ope,ra,,tions '- :July; 'i972 ,
July 2 ' 5
JulY 6
July 7
JulY 8
July 9
July 10
July 11
July 12
July.13
July 23.
RecOvered. DW plug from 2-7/8" tubing at 8585' BKB.
Ran Pressure/Temperature Survey.
Flowed well to clean up (A). Flowed well to check productivity (Al).
Reperforated 8824'-8887' BKB. Flow tested (B1). PBU.
Perforated .8750'-8760' BKB, .8766'-8794' BKB, 8804'-8818' BKB. Flow tested ;(C1).
P .B .U.
Ran pressure/temperature survey. Flowed to evaluate Crelad flow meter
(C2, C3 and C4).
Flow tested at two rates (C5 and C6). P.B.U.
Repeated evaluation of Crelad flow meter (C7). FloWed to test surface safety
valves Set DW plug in 2-7/8" tubing at 85~.gl ~B~:;~ !B1 dr"~l!~i~l~':/"to zer°
Installed 4" back pressure valve in t~ubing ha~ ~i[:ii~ l!~ii "~:.~ ~,~ ';7..~ .... ~'"'" ~'': '~" '
, (...../.,.. ~
16. I hereby certify ~% the foregoing Is true and correct
SIGNED _ A _ ward
TITLE
Manager (Operations)
(This space for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE DATE
See instructions On Reverse S, ide
July 12~ 1972
Form P--3
REV. 9-30-69
"Intentions" in Triplicate
S~brnit
& "Subsequent Reports" in Duplicate
STATE O.F ALASKA
OIL AND GAS CONSERVATION COMMITIEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APP-LICATION 'FOR I~'ER.~IiT~-'' 'for such'proPosals.)
5. APl NI//vl.EKICAL CODE
50-2.9-20042
6. LEA. SE DESIGNATION AND SERIAL NO.
ADL-28260
7. IF IN/DIAN, JLT-,~OTTEE OR TRIBE N.kM_E
0IL ~ GAB ~1
WELL WELL OTHER
2. NAME OF OPERATOR 8. UNIT FAP,3/I OR LEASE NAME
BP Alaska Inc. Put River
3. ADDRESS OF OPERATOR
P. O. Box 4-1379.,. Anchorage, Alaska 99509
4. Loc.~'r~oN or w~.,.L
Ats~,,'i'.~ce 458' WEL, 19'98' NSL, Sec'. 1, TllN, R12E., UPM
9. WELL NO.
BP M-1 (01-11-12)
10. FLEL~D AlqD POOL, OR WILDCAT
· Prudhoe Ba¥~ Prudhoe 0±1 Pool
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE.}
Sec. 1, TllN, R12E
13. ELEVATIONS (Show whether DF, RT, GR, etc. 12. PER1VIIT N'O.
KBE. 43' AMSL
,4. Check Appropriate Box To Indicate Nature of N~,ti'ce, Re ~ort, or Other Data '
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF PULL OR ALTER CASINO
FRACTURE TREAT MULTIPLE COMPI,ETE
StlOOT OR ACIDIZE [ j ABANDON*
REPAIR ,,'ELL CHANGE PLAN8
~Oth~ PERFORATE AND FLOW TEST
SUBSEQUENT REP0aT OF:
WATER SHUT-OFF . : REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOT'NG O. ACmlZING
(Other)
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
1,5. DFSCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly'state all pertinent details, and g, tve pertinent dates, including estimated date of starting any
proposed work.
Recover DW pl. ug from 2-7/8" .tubing at .7714' BKB.
Flow well and take PBU to' confirm present productivity.
Reperforate interval 8822.'.' 8887' BKB, flow test and PBU.
Perforate additional inter~'als 8804' -'8818',' 8766' - 8794' and 8750' - 8760' BKB.
Flow test and PBU.
Carry out flow meter survey.
Carry out 2-rate flow te~t',
Rerun DW plug and set in tubing.
16. I hereby certify he foregoing is true and correct
SIO~ED A, ward
TITLE Manager (Operatiqns) . DATE
(Thie space for State office use)
CONDITIONS OF APPROVAL, IF ANY: ~"
Chief P~troleumEngineer~
TITLE DATE
See Instrucfions On Reverse Side
Approved Copy,
R,eturn~d
BP AL/- SKA INC.
Vice-President, Production
and Planning, New York
Manager (Operations), Anchorage
_
SUBJSCT: Proposed Testing Program for-
BP Well M-1 (01-11-12)
_
.
.
- .
.-
·
A/M-289
MEMORANDUM
~,'m: May 5, 1972
FILE NO: .
YOUR REF: IL~j'
MA'f 9
-.
DIVISION OP OIL AND O/':~
Please find enclosed five copies of the proposed testing
program for BP Well M-1 (01-11-12). This program results
from our discussions with you in Anchorage on April 21st,- 1972.
After discussions in Anchorage we have again included a short
flow test prior to perforating in order to confirm the present
_ low P.I. of the well.
.
.-
· The program will start after testing of BP Well A-6 has been
- . . completed and equipment moved to M-Pad. This is expected to
- ' -' .'' be during early July. The testing will be performed without
_
._ ~ -: -.- a rig on location and is expected to last approximately 14
' days; this-includes eight days for rigging up and rigging
_
down of equipment:. ·
-' '- "-- ' An AFE for this work is being prepared -and will be forwarded
-- - to you within a few days.
_
.
.
.
..
.
-.
.
.... ]Inclosures
_
- . -
. cc: District Petroleum Engineer
' . District Reservoir Engineer
. -' - ~ .' Drilling Superintendent .
.
. - Mr. G. J. Plisga
_
Mr. J. A. Krug
Mr. Grombridge
.
:_
.
_ -
.
A ard
BP ALASKA INC.
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
P.O. BOX 4-1379
3111 - C - STREET
ANCHORAGE. ALASKA 99503
TELEPHONE (907) 279-0644
A-0 819 2
July 28, 19 71
3 ENG
4
5 E N,..~
1 GEOL
2 GEOL
3 GEOL
REV
DRAFT
SEC
CONFER:
FILE:
·
Attention: Mr. Homer Burrell
Gentlemen:
Well Number M-l(01-11-12)
Enclosed please find in triplicate, Form P-3 Sundry Notices
and Reports on Wells, for the above named well.
Very truly yours,
iBP ALASKA INC.
Senior Technical Advisor
WAD: vjp
Enclosures
cc: Operations Coordinator, New York
DI¥I.51ON OF OIL AND GAS
ANCHORAG~
Form
REV. 9-30-6 9
S~brnit "Intentions" in Triplicate
& "Subsequent Reports" iii Duplicate
STATE O'F ALASKA
OIL AND GAS CONSERVATION COMMIUEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form £or proposals to drill or to deepen
Use "APPLICATION 'FOR [~'EP,~IT--" 'for such 'pi~o~osal$.) ·
1.
O~L~E,.,. ?~ 0ASWELL [~ OTHER Appraisal
2. NAME OF OPERATOR
BP Alaska Inc.
3. ADDRESS OF OPERATOR
P. 0. Box 4-1379, Anchorage, Alaska 99509
4.LOCATION OF W~.I.L
At surface
458' WEL, 1998' NSL, See. 1, TllN, R12E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.
KBE 43' A3ISL
14.
5. APl NLrM.F,~C.a~L CODE
50-029-20042
6. LEASE DESIGNATION A-ND SERIAL NO.
AgL 28260
7. IF IN'DIA.N, A.L,LO'i-r~E OR TRIBE N,M.'Vf.E
8. UNIT, FAF,.IVi OR LEASE NAME
Put River
9, WELL NO.
BP 01-11-12 (M1)
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay Field-Sadlerochit Po,
11. SEC., T., R., M., (BOTTOM HOLE OBJEC'rlVE)
Sect. 1, TllN, R12E, UPM
12. PER/V//T NO.
~-7~
Check Appropriate Box To I,ndi,c~te Nature of N~ti'ce, Re ~ort, or Other Data '
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF I t PULL OR ALTER CASINO I~1
FRACTURE TREAT MULTIPLE COMPI,ETE
SHOOT OR ACIDIZE { t ABANDONS
REPAIR %','ELL ~ [ CHANGE PLANS
LOther) ,_
SUBSEQUENT REPORT OF:
WATER SHUT-OFF : REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING Oil *CIDIZING ABANDONMENTs
(Other)
NOTE: Report results of multiple completion on Well
ompletion or Reeompletion Report and Log form.)
DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any
proposed work.
This well was tested in May, 1970, but the productivity was abnormally low. The
guns were subsequently found to have been defective. The well at 'present has oil
to surface in the 2-7/8" tubing with a wireline plug set down hole. It is now
our intention to pull the plug, measure the productivity index and re-perforate
the same interval, (8820' - 8887' BKB). Thereafter the P.I. will be me-measured
and the well will be suspended with a wireline plug set 'in the tubing at about
8650' B.K.B.
This work should take about three days and is planned to take place in September.
.... IU L 2 9 lb ! f
DP/ISION OF OIL AND GAS
ANCHORAG~']
(This sp~ee for State/~ffiee,.us~)
See Instructions On Reverse Side
DATE
Approved Copy
Returned
BP ALASKA INC.
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
P.O. BOX 4-CCC
121 WEST FIREWEED LANE, SUITE 205
ANCHORAGE, aLaSKa 99503
tELEPHONE (907) 277-1422
A-04073
July 17, 1970
CONFIDENTIAL
Attention: Mr. Homer L. Burrell, Director
Gentlemen:
Well BP 01-11-12
Enclosed in duplicate is your Form P-7, "Well Completion or Re-
completion Report and Log", for the above well.
Enclosed also for your information is the Test Data and a Diary
of Operations concerning with regard to our re-entry into this
well.
Very truly yours,
BP ALASKA iN~.~~ /
P. A. Barber
Actl~g 0peratlons ~anager
hw
Enclosures
cc: Operations Coordinator, NY
Drilling Department
1970
A~4CHORAG~
Form P--7
SUBMIT IN DUPI. ICA"TE'
STATE OF ALASKA (See other in-
st r~lct ions On
OIL AND GAS CONSERVATION coMMITTEE
I_ ~ I I r ~ ,'
WELL COMPLETION OR RECOMPL, ETION REPORT AND LOG*
1~. TYPE OF WELL: on,' ~
,vz~ ~ ~ oar ~ Other
b. TYPE OF COMPLE~ON:
WELL ~NEWOVEBW0nK ~ DEEP-EN ~ .*e~PLUa ~ nESvB.'IFr' ~ Other 0b aarvat ion
2, NAME 0F 0P[RATOR
BP ~aSka Inc
ADDRESS OF OPERATOR
P.O. Box 4-CCC Anchorage, Alaska 99503
LOCATION OF WELL (Report location clearly and in accordance with any State requirements)
At surface 458! kIEL, 1998!NSL, See.l, TllN, R12E UPM
At top prod. interval reported below 678' WEL, 2031' NSL ,
At total depth
13. DATE SPUDDED
677' WEL, 2037' NSL
7-?1-69
18. TOTAL DEPTH, ll//_D & TVD I9. PLUG I~L~CK MD & TVD~, IF 1VITJLTmLE COiVZPL,, t21.
DEP~ ~OW ~Y* ROTARY TOOLS
Q qQ 7 ~ . , TOTAL
PRODUCING IN~VAL(S), OF ~IS CO~P~TION~OP, BOSOM, N~E (MD AND ~)'
8822' - 8887' ~ Sadlerochit Sandstone
8811' - 8876' T~
5. APl ND'iViER.I~ CODE
50-029-20042
~. LF....4_SE DESIGNATION AND SER3_4J~ NO.
. ADL-28260
9. ZF z~mi~, ~x~o~ OR V~UBE N~
8. UNIT,Fa OR ~SE N~E
Put ~ver
9. W~L NO.
BP 01-11-12
Prudhoe Bav-Sadlerochit 0il
n. s~c., T., ~., ~., (~o~ HO~ Pool
O~E~IVE)
Sec. 1, TllN, R12E
'12. P~IT ~O.
I 8-,24-6'9 , .', . 8-.30--69 i' 'R'B~ h3' AM.qT. _ ~. 2g' A'IVI'SL
'INTERVALS DRILLED BY
CABLE TOOLS
23. W~S DIRECTIO,N~L
SURVE~F MADE
Yes
24. TYPE ELECTRIC AND OTHER LOGS RUN
. GR/CBL/CCL Borehole Televiewer
i i_ m ] i i · m i"
~. ' CASING RECORD (Report all strings set in w~l~) ,
13-3/8
, , -
7 29 .: IN80 I 0_36'6' a~ ['.ann n~ a}~'~le, qqQ ny a/E~l 1922 , .
7,, ?g~}~aa ~,,~ · ! 1~99 l~a~ ~al . :._ ~ 9-7/R : a71a ./ a71a .-
- , ,-= ..... [ ,,t ',,,i,:,', . ,,I-- , ....
28, PE~ORkTIONS OPDN TO PROD~C~ON (Interval size and number) ~g, ACID, S,}IOT, FR~C'I'U~, C~NT SQUEEZE, ~C,
i !
8822' - 8887' q~'"'~O 0.27!' x 260
DATE OF TEST. jluiOl3~S TESTED · , "Jc~IoxE SIZE JPROD'N FOR
~-ow Tum~,rG' IC~G ~SS~ IC~~ 0~,
· O'ISPOSlTION 0r OaS (Sold, used )orIuet, vented, *tc.j'
,
D]~Ii~TI'I II~TIERVAL (IVLD) AMOUNT Zd~D A21ND O,F bIA~T~qlAL used
i ! i i iii i ! i i i
PRODUCTION
DATE FIRST PI%ODUCTION [ 'PROD~ICTION ME'ii{OD (Flowing, gas lift, pumping--size and type of ptu'np)
I
OIL--BEL. GAS--i~CF.
I
GAS--MCF.
m I
IWELL STATUS (Producing or
shut-in)
' I'
i '
WATEI~--BBL. J OIL GRAVITY-APl (CORR.)
,~ -,~-
JTEST WITNESSED BY
~,~3,~~:~----,'/2~,: ............. i~LE Acting 0peratzo. ns .M 17.. 19..7.0
anager DATE July'~' "'- ' ' ' .
......... Iii_ mm i m i mil I _ I I
*(See Instructions and S~ces for Additional Data on Reverse Side)
.
,,,
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leaSes in Alaska.
Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for deplh measure-
merits given in c~her spaces on this form and in any attachments.
Items 20, ~,nd 22:: If this well is completed for separatc- production from more ~han one interval zone
(multiple completion), so state in item 20, and in item 22 show the p~cJucing interval, or intervals,
'toP(s), bottom(s) and name (s) (if any) for only the interval reported in item 30. Submit a separate report
(page) on this form, adequately identified, for each additional inte, val to be seperately produced, show-
ing the ad~clitional data pertinent to such interval.
Item26: "S~cks Cement":: Attached supplemental records for this well should show the details of any mul-
tiple stage cementing and the location of the cementing tool.
Item 28: Submit'a separate completion rePOrt on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above):
._
34. SLTMM.A~y ~)'-F FORah/I~TION TF~TS INCLUDING 'INT~VA~{~D, P~URE DATA ~ ~OV~ OF OIL, G~,
, · 35. G~GIC MARK~
'wA~ AND: MUD ., ,
~ ~ N~
~In~ervals Tested Producti°n ~p~te ~ ~ ~raVity ~,~s. ~ ~ w.r.'n~
· ~ Subsea
~ ~ ~ ~ Lower Cretaceou~ Approx. Approx.
1)- 9055' - 9060' 20 - 30 b/d atmospheric 1~.8° Unconfor~ty 676~ 6726
2) 899~' - 9008' ~ c 150 b/d atmOSpheric 2~.2o
~) 896~' - 8982') c 2~00 b/d 1~0 ps~g 25.~ Top Sag ~iver
899~' 9008' ) S~d~ tone 8590 853~
~)~ 8822' - 8~ ' c 12500 b/d ~80 psi~ 26.~°
Top Sh~lik Fm. 863~ 8582
~or further details ~ee Tes~ Data ~ec~on of ~he ~ell His~o~ Top Sadlerochit ~707 8655
..... ~ Fore,ion
3~. cone DAT~. ~CH BmE~ D~CR~P~ONS O~ L~T~OLOCV. ~O~OS~TV. ~U~C~. ~P~NT raPS
~ AND DETECt'ED SHOWS O~ OIL, G~ OR WA~. ~S~ Sadlerochi~
Saud 9 ~09 9257
N~L ~ ~
.
BP ALASKA INC.
P.O. BOX 4-CCC
121 WEST FIREWEED LANE, SUITE 205
ANCHOraGE, AlaSka 99503
TELEPHONE {907) 277-1422
A-04009
June 9, 19 70
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell, Director
Gentlemen:
Monthly Report of Drilling. and Workover Operations
Enclosed in duplicate are monthly reporting forms for our wells
BP 01-11-12, 32-11-14, 14-11-13 and 30-11-14 for the month of
May, 1970.
Very truly yours,
hw
Enclosures
BP ALASKA INC. ~'~' //
'~t~""'A~ Barber
Acting Operations Manager
No. P--4
9-30-6'7
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMII-[EE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
Appraisal
2. NA-ME OF OPEI~2kTOR
BP ~..ASI~ INC.
3. ADDRESS OF OPEA~kTOR
P. 0. Box 4-C¢C. Anchorage~ Alaska
4.LOCA~ON O,F WELL
At surface: 458' WEL, 1998' NSL
Sec 1, TllN, R12E, UPM
SUBMFT I/~ DLrpLICATIE
qq 5C).q
~. API NL~iER1C.~L CODE
API 50-029-20042
6. LF~kSE DESIGNATION AND SEEIAL NO.
APL 28260
" IF INDIA~, ALXDT/-EE OR TRIBE NA~E
8. LLNIT,F.4~RA{ OR LEASE NA3~E
Put River
9. WELL NO.
BP 01-11-12
10. FIELD A_ND POOL, OR WILDCAT
Prudhoe Bay--Sadlerochit 0il Po(
t ~ I SEC., T,, R., M.. (BOTTOM HOLE
OB~ZCTrVE)
Sec 1, TllN, R12E, UPM
12. PERRaA4IT NO.
69-78
13. REPORT TOTAL DEPTH AT END OF MON~, CIiA_NGES IN HOLE SIZE, CASING AArD CEIvIENTING JOBS INCLUDING DEPTH
SET ~ VOLIIATES USED, PF-a~FOtLATIONS, T~ISTS ~ PLESULTS, FISHING JOBS, JU/VK I2q HOLE A2qD SlDE-T]R~%CKED HOLE
AND ~Y OTX~]ER SIGNIFICANT CXW_A2q~ES IN HOI~ CON]DITIONS.
May 19 70
1 - 31
CONFIDENTIAL
Perforated and flow tested following intervals:
9055-9060", 9000'9008' , 8824'8884' (RTKB) .
Released rig @ 2200 hours on May 31, 1970.
14. I hereby
NoTE--~eport on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate
with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed.
BP ALASKA INC.
May 27, 1970
P.O. BOX 4-CCC
121 WEST FIREWEED LANE, SUITE 205
aNcHOrAGE, aLASKa 99503
TELEPHONE {907) 277-1422
A-03394
US 7-2-01-11-12
HLB ~-
TRM ~--
OKG
KLV
HW~( ~~_
FILE
CO I[I [ TIAL
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell
Gentlemen:
BP 01-11-12
Enclosed in triplicate is your "Sundry Notice and Report on Well"
form P-3, advising of our intention to complete the above well as
an observation well.
hw
Enclosure
cc: Operations Coordinator, NY
Very truly yours,
Operations' Manager
Form
F(~W. 9-30-67 ,~,
Submit "Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION CO,MMI'FrEE
SUNDRY NOTIC'ES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir.
Use "APPLICATION FOR PEI~MIT--" /or such proposals.)
1.
OIL ~ GAS ~] OTHER
WELL W~LL Appraisal
2, NAME OF OPERATOR
BP AT,ASWA TNC.
3. ADDRESS OF OPERATOR
P. 0. Box 4-CCC, Anchorage, Alaska
4. LOCATION O'F WELL
At surface
99503
458' WEL, 1998' NSL, Sec l, TllN, R12E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.
KBE 43' AMSL
HLB
~, TRM ~
OKG
~. API N~CAJ~ CODE ' ~LV ................
50-029-20042 :~"' '"
6. LEAS~, DES/GNATION A_ND SERIAL NO.
ADL 28260 --
7. IF INDIAN, ALLOTTEE OR TYIIBE ~
8. UNIT, FA. R1VI OR i~F~SE NAME
Put R~ver
9. WELL NO.
BP 01-11-12
10. FTP, T,T) AND i~OOL, OR WILDCAT
Prudhoe Bay-Sadlerochit 0il Pool
11. SEC., T., R., M., (BOTTOM HOLE
OBJECTIVE)
Sec 1, TllN, R12E, b-PM
12. PER1VIIT NO.
69'78
Check Appropriate Box To [n,d:icate Nlature of I~,ti'ce, Re, ,ort, or 'Other 'D,at~
NOTICE OF INTENTION TO:
TEST WATER 8HUT-OFF I I PULL OR ALTER CASING
FRACTURE TREAT j [ MULTIPLE COMPI,ETE
SHOOT OR ACIDXZE ~__~ ABANDON*
REPAIR WELL CHANGE PLANS
(Other)
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL ~
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMEN'T*
(Other)
NOTE: Report results of multiple completion on Well
ompletion or ReeD.repletion Report and Log form.)
15. DFSCRIBE PROPOSED OR C0MPL~,TED OPERATIONS (Clearly state all pertinent detail~, and give pertinent dates, including estimated date of starting an}'
proposed work.
Further to our Sundry Notices of March ,13 and APril 21, 1,970, it is now our
intention, upon completion of the approved testing 'Program, to complete as
· .
an observation well with a single packer and tubing string. The casing
annulus will contain .a packer fluid and the tubing oil. A wireline plug will
be installed in a nipple close to the packer, which will be set at approxo
;8700' DD.
SIGNED ~ ~[ CT ARK~ TITLE Operations Manager
.
(Thl~ space for State o~lusg,) '--' ~
CONDITIONS OF APPROVAL, IF ANY: t~y
DATE May 26, 1,970
DATE
Approved Copy
R,eturncci
~.,-"-/- 7a
See [nstrucfions On Reverse $,id,e
l~rm
REV,
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKO.VER OPERATIONS
WELL WELL
SUBMIT EN DUPLICATE
5. API NI/MERiCAL CODE
API 50-029-20042
6. LEASE DESiGNA~--ION AND SERIAL NO.
ADL 28260
?. IF INDIAN, ALOTTEE OR TRIBE NAME
Appraisal
2. N~E OF OPER~ATOR 8, L~IT,F.~RA~ OR LEASE N.~ME
BP Alaska Inc. Put River
3. ADDRESS OF OPERATOR
99503
P. 0.'Box 4-CCC~ Anchorage, Alaska
4, LOCA~ON OF WEJ-J.
At Surface
458' WEL, 1998' NSL, Sec. 1, TllN, Ri2E, UPM
9. WELL NO.
BP 01-11-12
10. FIELD A_ND POOL, OR WILDCAT
Prudhoe Bay - Sadlerochit Pool
I1. SEC., T.. R., M.. (BO'I~FOM HOLE
o~.mcTrVE)
Sec. 1, TllN, R12E, UPM
12. P~RiVIIT 1~O,
69-78
13. REPORT TOTAL DE%ruTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING A2N-D CE1VIENTING JOBS INCLUDING DEPTH
SET AD VOLU/VEES USED, P~ORATIONS, TESTS A/XrD RESULTS, FISHING JOBS, JUiXTK IN HOLE A/~D SIDE-TP~ACKED HOLE
AND ~NY OTHER SIGNIFICANT CHANGF_~ IN HOL~ CONDITIONS.
April, 1970
i - 3 Completed rigging up.
3 - 24
The 7" casing was partially collapsed at the following intervals
110', 236', 371', 415', 500', and 631'. The damaged sections were
milled out and the casing was inspected with logs. The casing was
removed down to 1922'. During the milling operations the 9-5/8"
casing was damaged, at 110'. The 9-5/8" casing was cemented to the
surface with 360 sacks of cement. Cleaned out and 7" casing run with
a casing patch. After matching to the cut off casing at 1922' the
casing was cemented to the surface with 350 sacks of cement.
24 - 30 Drilled bridge plug at 2500' and cleaned out to 3270'.
0 e ation~ Mana~ r
SIGNED DATE Mmv ] A ] q 70
N0 R is r ~ q or each cale.~ar month, regardless of the status of o~erations, an~ must be filed Jn duplicate
with me Division of Mines & Minerals by the 15th of t~e succeeding month, unless othe~ise directed.
BP ALASKA INC.
P.O. bOX 4-CCC
121 WEST FIREWEED LANE. SUITE 205
ANCHORAGE. alaSkA 99503
TELEPHONE {907} 277-1422
HLB , , --
TRM - -
OKG ~
KLV
HW.~, ,,~:-.
FILE
April 23, 19 70
A-03336
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell, Director
Gentlemen:
Sundry Notices and Reports on Wells
BP Put River 01-11-12
We enclose, in triplicate, Form P-3 "Sundry Notices and Reports
on Wells~' for the above well.
R[C. VED
APR g'i~' t97U
ANCMORAG~
ch
Enclosures
cc: Operations Coordinator - NY
Very truly yours,
BP ALAS]i .
Operations Manager
Submit "Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATE O'F ALASKA
OIL AND GAS CONSERVATION COMMIT-i'EE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir.
Use "APPLICATION FOR PEi~VII'F--" for such proposals.)
HLB ~. ,,r ,
TI~
OKG
^Pz N'm~,m~c.~z, COOE' i<LV --.
50-029-20042 HWK
6. LEASE DES,IGNATION A_ND SElllAL 1~ [
ADL 28260 --- ~
?. IF I1N-DIA~I, A-LLOTM OR TRIBE
0IL
WELL [] GAS Appraisal
WELL [-~ OTHER
2. NAME OF OPERATOR 8. UNIT, FA, RM OR LEASE NAME
BP Alaska Inc. Put River
3. 9. W~LL NO.
99503
ADDRESS OF OPERATOR
P. 0. Box 4-CCC, Anchorage, Alaska
LOCATION O,F WELL
At surface
458' WEL, 1993' NSL, Sec. 1, TllN, R12E, UPM
13, ELEVATIONS (Show whether DF, RT, GR, etc.
KBE 43' AMSL
14,
BP 01-11-12
10. FIELD A2%ID POOL, OR WILDCAT
Prudhoe Bay - Sadlerochit 0il Pool
SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 1, TllN, R12E, UPM
12. PER/VIIT NO.
69-78
1,
Check Appropriate Box To I,nrd',iIc;ate Nlature of N~oti'ce, Report, or Other 'Dat~
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF ~-~ PULL OR ALTER CASING
SUBSEQUENT REPORT OF :
WATER SItUT-0FF REPAIRING WELL
FRACTURE TREATMENT
ABANDON MEN'Ts
SfI00T 0R ACIDIZE ABANDON* SHOOTING 0R..,&CIDIZING
,,
REPAIR WELL [ CHANGE PLANS (Other)
(NOTE: Report results of multiple completion on Well
(Other) Completion or Recompletion Report and Log form.)
'"1~. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Cle~'rly state all pertinent details, and give pertinent dates, including estimated date of starting an~'
proposed work.
Upon re-entering our Well 01-11-12 in accordance with our Sundry Notice of March 13,
1970, the 7" casing was found to have partially collapsed at six places down to 630 ft.
The failures were at 110', 236', 371', 415', 500', and 631'. These'spots were
milled out to allow the passage of gauge tools, the casing was inspected with logs and
the damaged sections were removed. A final cut was made at 1922'. During milling
operations some damage occurred to the 9-5/8" casing at 236' and communication was
established to surface through the casing. The 9-5/8" was subsequently cemented to
surface through the damaged area.
.
It is our intention to run a casing patch, make up to the casing in the hole and cement
to surface from 1920'. After this operation we shall proceed with the flow testing
program as per our Sundry Notice of March 13, 1970.
t'~~zue and correct
TITLE Operations Manager
DATE
(This space
CO~ITI'O~
April 21, 1970
Approved
Returned
See, '[n:strucfions On Reverse Side
lVorm
REV.
STATE OF ALASKA SUBMrr nw DUPLICATE
OIL AND GAS CONSERVATION COMMII-[EE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
Appraisal
2. N~E OF OPEI~ATOR
BP Alaska Inc.
3. ADDRESS OF OPEI~ATOR
P. O. Box 4-CCC~ Anchorage, Alaska 99503
4, LOCATION O'F WELL
At surface:
458' WEL, 1998' NSL, Sec. 1, TllN, R12E, UPM
~. API NLrMERiCAL ~ODE
API 50-029-20042
6. LEASE DESIGNATION AND SE1RIAL NO.
ADL-28260
7. IF INDIA~, ALOTTEE O~ TRIBE NAME
8. L.~X'IT,F.~RA'I OR LEASE N.~ME
Put River
9. WELL NO.
BP 01-11-12
10. FIELD AND POOL. OR WILDCAT
Prudhoe Bay-Sadlerochit Pool
Il. SEC., T,, R., M.. (BOTTOM HOLE
Sec. 1, TllN, R12E, UPM
12. PERMIT NO.
69-78
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING A/ND CEMENTING JOBS INCLUDING DEPTH
SET ANY) VOLITMES USED, PEI{FOP~ATIONS, TESTS A/XrD RESULTS, FISHING JOBS, JUNK iN HOLE A/~D SIDE-TP~ACKED HOLE
AND A_NY OTI-~R SIGNIFICANT CH-ANGES IN HOI~ CONDITIONS.
March, 1.9 70
CONFIDENTIAL
18 - 29 Move and rig up.
29 - 31 Nipple up and rig up for flow test.
14. I hereby certify that the foregoin~/~/F/~~/~
NOTE--Report on this form is uired for each calendar month, regardless of the status of operations, and must be filecl in duplicate
with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed.
ESTIb~TE OF OIL TO BE PRODUCED DURING FLOW TESTING
Zone 1
Flow test and
sampling
Perforated 9055 - 9060
Rate of ¢. 300 Bbls/day for 1 day
Oil Produced
300 Bbls
Zone 2
Flow test and
sampling
Bridge Plug
Perforated 9000 - 9008
Maximum rate 1000 Bbls/day for 24 hrs.
1000 Bbls
Zone 3
Maximum rate
flow test
Performance
flow test
Sampling
Safety valve
operation
/performance & well
completion testing.
.Bridge. Plug
Perforated 8824 - 8884
10,000 Bbls/day for 5 hrs. and clean
up 1 hr.
6000 Bbls/day for 12 hrs.
1000 Bbls/day for 12 hrs.
6000 Bbls/day for 24 hrs.
2500 Bbls
3000 Bbls
500 Bbls
6000 Bbls
13,300 Bbls
W. A. DOWNIE
March 24, 1970
FORM SA- I B
MEMORANDUM
TO: ['Homer L. Burrell ~
Director
Through: O.K. Gilbreth, Jr.
Chief Petroleum Engineer
FROm: Lonnie C. Smith
Petroleum Engineer
S a' e of Alaska
Department of Natural Resources
Division of Otl & Gas
DATE : April 9, 1970
SUBJECTs Checking BOP Equipment on North
.. Slope
On March 31 I traveled to the North Slope by commercial aircraft arriving
at Deadhorse at approximately 2:00 p.m. I made arrangements with the Mobil Oil
Company's expeditor to proceed by their charter plane to the West Staines State
No. 1 well. I was met there by their contract drilling foreman, Mr. Weldon
Ingrain, who informed me that they would be unable to test the well for a period
of time because the proper plug testing equipment was not on location, but was
expected on the next plane. It was to. late to make any further arrangements
so I stayed overnight at the West Staines and the next morning proceeded on the
early morning flight to the Mikkelsen Bay State No. 1 well. .'
The drilling foreman on the Mikkelsen State Bay well is Mr. Paul Hodges, who
informed me that they would not be able to pressure up to working pressure of the
equipment, 5,000 psi, without getting a special Halliburton crew out at approxi-
mately $1,000 per day. I informed him that we preferred a full working pressure
test because the drilling permit had been approved for a certain ultimate objec-
tive and that was what this equipment was designed for. I did agree to accept
the pressure he could put up with his rig pumps on the test. The pipe was pulled
out of the hole at 11:30 p.m. on April 1, and we began our BOP testing and completed
the pressure testing at 2:30 a.m. on April 2. Test pressures range from 2300 psi
to 2650 psi on the equipment, however, the driller'noted on the drilling log that
the BOP equipment was tested to 2,000 psi, which I signed as a witness. Two leaks
in the kill line were repaired before a satisfactory test was obtained. This mani-
fold and BOP equipment stack is 5,000 psi equipment, however, I noted that there
was only a 3,000 psi SWACO adjustable choke installed on the manifold. An internal
blowout preventor type floor valve was available. I also inspected the location
and informed Mr. Hodges that they needed a well sign and that the location should
be cleaned up better, since there was considerable trash on all sides of the loca-
tion and unburned trash piles in various locations around the pad. I also suggested
that Mobil might give more attention to putting complete berms around their pillow
tank fuel storage areas.' The fuel storage area is necessarily on the pad or adja-
cent to it and very close to the well and crew quarters. There are seven pillow
'tanks located at this well and a rupture in any one could, with no berm involved,
allow fuel to reach either the crew quarters or possibly the rig. The next morning
Mr. Hodges informed me that well signs had been ordered for the Mobil wells and
that they would give more attention to the berms and clean up around the wells.
I returned to the West Staines State No. 1 well that afternoon. The new test
plug had arrived and on the next trip the equipment could be tested. Unfortunately
for me the bit they had run drilled for some 400 plus feet and was in the-well for
over 24 hours, consequently it was 9:00 p.m. on April 3 before they were ready to
pull the pipe. Even after this the geologists decided they would have to circulate
the hole for some period of time and it was the next morning at 5:00 a.m. on April
4 before we were ready to test the BOP equipment. This particular well was rigged
up with the main kill line on the drilling spool placed right on top of the casing
Homer L. Burrell
Page 2
April 9, 1970
head underneath the blind rams, and the test plug seated just below the blind
rams above the main kill line, so it was necessary to take a blind flange off
the side of the double blowout preventor stack in order to pump in just below
the blind rams for testing. This wamn't the most satisfactory procedure since
it was necessary to rob the kill line off of the drilling spool and place it on
this new flange for the pressure test only, and then to replace it on the
original hookup. The preventor equipment was tested with 1400 # and 3,000 # to
my satisfaction. This well had a ball type valve installed below the kelly as
well as the kelly cock. Both of these valves were actuated in my presence. They
had both a ball type and an internal blowout preventor type valves available on
the floor.
An inspection of the location revealed that this well also did not have a
well sign, that the location needed further cleanup, and that the berms around
· the storage pillow tanks were incomplete. On both Mobil wells the manifold system
had been pressure tested when installed to 5,000 psi and was left filled with
diesel oil to prevent freezing. Neither of the rigs had an auxiliary hydraulic
pump and without the Halliburton pumps they could not pressure test the manifold
system without the necessity of flushing, steaming and refilling it with oiI to
prevent freezing, following the test. Due to the trouble involved, the drilling
foreman requested that the manifold systems not be tested.
I considered both of these tests unsatisfactory from the standpoint of being
overall incomplete (manifold not tested, kill systems changed, etc.) and at mini~
~mum pressures and would recommend that'the 'local. Mobil drilling department be in
~l~formed of our lack of satisfaction with the BOp test on these two wells and other
.... points Such as well signs, pillow.'tank, berms~ . and.. the. cleanu, p needed around these
I returned' to Deadh°rse °n Mob'il's charter flight at~'7:45 p.m. on April ~.
From Deadhorse I contacted BP at the Mukluk camP and found out that their pro-
posed test on Put River Noo 1-11-12 had been postponed due to problems with the
casing. I contacted the Gulf rig by side band radio and made arrangements to be
picked up by the charter aircraft servicing the Gulf rig.
I arrived at the Gulf rig on Colville Delta' .State No. 1 at approximately
9:30 p.m. The pipe was almost out of' the hole when I arrived and we immediately~
proceeded to prepare for the BOP test° Ram preventors were tested with approxi-
mately 3500 to 3700 psi and the annular preventor was tested with 1500 psi. I
witnessed the actuation of the kellY cock valve and was informed that there was
a ball valve installed on the lower end of the kelly. An internal blowout
preventor type valve was available on the rig floor. Ail preventors closed in
approximately 5 seconds, which was the fastes~ closer on BOP's that I had witnessed
on any test.' Ail equipment was in excellent condition and the crew seemed to be
better trained and better prepared on BOP procedures than any that I had encountered
so far to date. , The manifold was well constructed and sized, with one positive
.choke,. one adjustable choke and one automatic adjustable 5,000 psi SWACO super
~'~choke. The manifold system on th~s well also was not tested, since it had been
pressure tested and was now dry and would require steam cleaning and draining to
prevent freezing after any testing. The drilling foreman, Mr. Buzz Buzzard, was.
willing to test the choke manifold system, however, .after reviewing their rig and
equipment status I was completely satisfied that the manifold was in good order a. nd
felt sure that it had been tested adequately. We. were finished with-the BOP check
by 11:30 p~m., only two hours after my arrival on location.
Homer L, Burrell
Page 3
April 9, 1970
their one pillow tank had a berm around it, (even though very little gravel was
available ~t~~ used on this pad or location). This rig is rigged up on
a board matting pad with no gravel-or piling underneath it. There has been no
thawing under the rig or mud tanks and no settling of the equipment, I was
allowed to examine the test data tabulated from the thermo couples installed
around the cellar'~nd under the mud tanks. Gulf did not have a well sign on the
location and I informed them that it was a requirement and requested that they
get one.
I returned to Deadhorse by a Gulf charter at 11:30 a.m. and continued by
commercial plane to Anchorage.. I arrived in Anchorage at approximately 3:15 p.m.
on April 5.
LCS:jw
BP 01-11~12 - ESTIMATE OF OIL TO'BE'PRODUCED DURING FLOW'TESTING
· ,
Zone 1
Flow test and
sampling
Perforated 9055 - 9060
Rate of c. 300 Bbls/day for 1 day
Oil Produced
300 Bbls
Zone 2
Flow test and
sampling
Bridge Plug
Perforated 9000 - 9008
Maximum rate 1000 Bbls/day for 24 hrs.
1000 Bbls
Zone 3
Maximum rate
flow test
Performance
flow test
Sampling
Safety valve
operation
/performance & well
completion testing.
Bridge Plus
Perforated 8824 - 8884
10,000 Bbls/day for 5 hrs. and clean
up 1 hr.
6000 Bbls/day for 12 hrs.
1000 Bbls/day for 12 hrs.
6000 Bbls/day for 24 hrs.
2500 Bbls
3000 Bbls
500' Bbls
6000 Bbls
13,300 Bbls
W. A. DOWNIE
March 24, 1.970
BP ALASKA INC.
A-02558
March 13, 1970
P.O. BOX 4-CCC
121 WEST FIREWEED LANE, SUITE 205
aNCHOraGE, aLASKa 99503
TELEPHONE (907) 277-1422
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell, Director
Gentlemen:
BP 01-11-12
Enclosed in triplicate is Form P-3, "Sundry Notices and Reports
on Wells", advising of our intention to re-enter the above well
to carry out a flow testing program before completion as an ob-
servation well.
Very truly yours,
hw
Enclosures
cc - New York
Operations Manager
Form P--3
REV. 9-50-67
Submit "Intentions" in Triplicat~
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION ,COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir.
Use "APPLICATION FOR PEPdVIIT--" for such proposals.)
5. APl NUlVLER/CA3~ CODE
API 50-029-20042
:6. LEASE DESIGNATION A_ND SEKLA/~ NO.
ADL-28260
Appraisal
8. UNIT, FA/~NI OR LEASE NA_ME
Put River
2.NAME OF OPERATOR
BP Alaska Inc.
3. ADDRESS OF OPERATOR
P. 0. Box 4-CCC~ Anchorage, Alaska 99503
4. LOCATION OF WELL
At sur£ace 458' WEL, 1998' NSL, Sec. 1, TllN, R12E, UPM
9. WI~T~L NO.
BP 01-11-12
10. FLEI.~ ~ FOOL, OR WILDCAT
Prudhoa Bay (Sadlerochit Pool)
II. SEC., T., R., M., (B'OTT~M HOI.,~ oBdrECTIVE)
Sec 1, TllN, R12E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc. 12. PE/~M/T NO.
i
KBE 41' AMSL ] 69-'78
~4. Check Appropriate Box To I~nd',i'cate Nlat'ure of Nlofi'ce, Re,pod, or Other 'Date
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF II PULL OR ALTER CASING
FRACTURE TREAT I I MULTIPLE COMPI,ETE
SHOOT OR ACIDIZE ~__~ ABANDON*
REPAIR WELL CHANGE PLANS
SUBSEQUENT REPORT OF:
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMEN'T*
(Other)
(Other) Flow Test (NOTE: Report results of multiple completion on Well
C?mpletion or R. ecompletlon Report and Log form.)
15. DFSCRIBE I'ROPOSED OR COMPLETED OPI~RATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an.y
proposed work. ...
We propose to re-enter our subject well on or about A~'i~,. 1970 t'o carry out a brief
flow testing program and complete as an observation well in 'the SadlerOchit Pool.
We intend to perforate three, intervals between 8824.' and 9060' and flOw test the well.
After the testing, the well will be completed as an observation well with a
$afet¥ valv.~e at approximately 2,000 ft. above which the tubing>and annulus will ............................................
~°ntain crude °il or diesel. ' / .
· ,
During the above operations the wellhead will have installedI either a 5,000 psi W.P.
production stack~ 3,000 psi W.P. bloWout preventers, i/ ·
~,'- ~ .... ,.
18
(This ~pace for State o~}ee~e
APPROVED BY
CONDITIONS OF AfbpRbyAL
e and
DWI3~ON CF: C:iL A',ND
ANC~O~AG'~
correct
TITLE .... Operations Manager DATE March 13,.
1970
See l~nstrucfions On Reverse Side
ApFrc,:'c:d Copy
Returned
BP ALASKA INC.
A-02557
US 7-2-01-11-12
P.O. BOX 4-CCC
121 WEST FIREWEED LANE. SUITE 205
ANCHOraGE, aLASKA 99503
TELEPHONE (907) 277-1422
March 12, 1970
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Homer L. Burrell, Director
Gentlemen:
Put River ~01-11-12
As requested in your letter dated March 10, 1970 enclosed are
two copies of the Sperry-Sun Surwel Gyroscopic Multishot from
surface to 9300 feet.
hw
Enclosures
Very truly yours,
BP ALASKA
BP ALaSKa INC.
P. O. BOX 4-CCC
121 WEST FIREWEED LANE. SUITE 205
ANCHORAGE. ALASKA 995'03
TELEPHONE 277-1422
A-01595
US 7-2-01-11-12
State of Alaska
Department of Natural Resources
Division of Oil and Gas
3001 Porcupine Drive
Anchorage, Alaska 99503
Attention: Mr. Homer L. Burrell, Director
Gentlemen:
BP Put River 01-11-12
In reply to your request dated December 17, 1969, enclosed are two
copies of the Directional Survey on the above well.
Very truly yours,
BP ALASKA INC.
Operations Manager
hw
Enclosures
KEITH H. MILLER, Governor
DEI~%RTMENT OF NATURAL RESOURCES
DIVISION OF OIL AND GAS
3001 PORCUPINE DRIVE-ANCHORAGE 99504
.__J
Re:
Gent lemen:
The below-indicated reports and other information on subject well, as required by
AS 31.05.030 and the applicable Oil and Gas Conservation Regulations, 'are:
~ OVERDUE. Please submit.
,
[-']' INCOMPLETE. We are enclos,ifi'~.'::I Pi~ase: complete and return.
[~] APPARENTLY IN ERROR. We are en~Iosing. Please correct and return.
REQUiRED'REPOrTs AND OTHER INFORMATION
~ P-l, Application for Permit to
Drill Or Deepen.
~ P-3, Sundry Notices and Reports.
~] P-4, Monthly Report of Drilling and Workover Operations.
~ P-7, Well Completion or Recomp let ion
Report.
Directional Survey/ ~ i?C)p ;~____, ,...%
Electric or Radioactivity Log.
~ Sepia ~ Blue line
Mud or Lithology~og
~ Sepia ~lue line
Samples and Core Chips
~ P-13, Report of Injection Project.
Chronological Well History
Remarks:
Very truly yours,
Homer L. Burrell
Director
BP ALASKA 1 NC.
P. O. BOX 4-CCC
121 WEST FIREWEED LANE. SUITE 205
ANCHORAGE. ALASKA 99503
TELEPHONE 277-1422
September 30, 1969
A-00975
US 7-2-01-11-12
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Gentlemen:
BP 01-11-12
Enclosed in duplicate is your Form P-7, "Well Completion or
Recompletion Report and Log", advising of our intention to
suspend the above well.
Also submitted are attachments as listed in Item #32 of the
above form.
hw
Enclosures
cc: Mr. P. Hardwick
Very truly yours,
·
Operations Manager
SEP 3)
BP OIL CORPORATION
P. O. BOX 4-1395
ANCHORAGE, ALASKA 99503
September 29, 1969
To:
State of Alaska
Department of Natural Resources
Division of Oil and Gas
Reference: Well Records
The following material is being submitted herewith. Please acknowledge
receipt by signing a copy of this letter and returning it to this office:-
Put River BP 01-11-12
Completion Report
Dual Induction - Laterolog (3 sepias + 3 blue lines)
Sonic - Gamma Ray Log (2 sepias + 2 blue lines)
Baroid ppm Log (1 sepia + 1 blue line)
Received ............. _?_2_~__~ ........................... 19._~_.?
Form P--7 ('
SUBMIT IN DUPI.IC~TE*
sTATE OF ALASKA ',See other m-
st rLIc! OhS
OIL AND GAS CONSERVATION COMMITTEE ~,.~,.~
i
WELL cOmPLETION OR RECOMPLETION REPORT AND~[~d*
. ,
~. ~Y~ O~ COM~O~:
~zw ~ woa,; ~ ~zze- ~ ~s~ ~' ~zr~' ~ Suspension a. um~,~oz~sz~z
WgLL OVeR ~N BA~ B~VB. Other
a. s~z or oeza,~oa Put River
BP A~S~ INC. ~.
~. a,~a=ss or oeza,~oa BP 01-11-12
P. O. BOX 4-CCC, ~CHO~GE, A~S~ ~0. ~ ~oon; oa
'4. nocaw~o~ o~ w~nn (Report ~ocation e~ea¢~ and ~n accordance wita an~ ~tate reqa~re~eats)* Prudhoe Bay
at su~aCe 458' WEL, 1998'. NSL, Sec 1, TllN, R12E, UPM
At top pro~. interval reportea below
At total
At 9300' DD 67?' WEL, 2038' NSL, Sec 1, TllN, R12E, UPM ~z.~w~o.
69-78
....
13. D~ S~DDD 14. DA~ T.D. R~C~D 15. D~ CO,~P, SUSP,~ ~. I~."~EVA~ONS (DF, RKB RT, GR, ~C)' 17. ~. ~SINGHEAD
.: 7/21/69 8/24/69 8/30/69 ~ KBE 41.23 ~SL ~
DEP~ HOW ~Y' ROTARY TOOLS CABLE TOOLS
9397 DD ~BP ..2500 DD Total
~. PRODUCING ~VAL(S), OF ~IS ~O~P~TIO~O~, BOSOM, ~AME (~D AND ~)*
24. T~E E~CTRIC ~D OTH~ LOGS '.~UN
DIL, BHCS/GR, PML/ML,~ MLL/ML, LA3, FDC, SNP/GR, CST
.
~. ~ -. ~ CAS~G RE~ (Re~rt all strings set in w~{1) '
I
' 20 94 '.' ~ H~O '[ ..$O0'q~ 26 ~ 108 sacks ~ermafrost , --
13-3/8 61 J J55 [ 928 17-1/2 1240 sacks Pe~hafrost [" --
. ~-5/8 47 / N~Q i 4087 l~2"z/4 I '~20 sacks G; 685 sa&ks
7 29 / NS0 i 9366 [ 8-1/2 ,[ ;00 sacks O/~lt; 390 '.~ --
30. LINER ~COD 27. TUB~G zmco~ sackS O/~el
28.. PERORATIONS OPeN TO PR~O~ (Interval, size and number) ACID
PRODUCTION
SCREEN (1V~D). SIZE
DEP~'I INTEVAL (~)
DATE FIRST PfiODI/CTION I "FRODUCT1ON ME'iHO'D Flowho.g, gas lift, pumping--size and type of pump)
DAT~: OF TIST, ~I-IOUlqS TESTED , 'ICItOIfE SIZE ~PROD'N FOR OIL---BBL. GAS--MCF.
FLOW TUBING
31. DISPOSITION OF OAS (~Old, USed for ]Mel, vented, etc.)
APl N~CAL CODE
API 50-029-20042
LZ~Ss D~s~d~ON A~D s]~n~ ~o.
~L-28260
?. IF INT)I~T, AJ.J~ OR T'R. IBE NA_NIE
11. SEC., T., R., M., (BOTTOM I-IOLE
OBJECTIVE)
Sec 1, TllN, R12E, UPM
FrOm 9300' DD
I WELL STATUS (Producing. or
szlut-in) ..........
WATER--B15L. [ GAS-OIL 1R~TIO
',V~TER~BBL. 1 OIL GR~VIT¥-API (COP~R.)
t TEST
LIST OF A'~T=A'6~/~iENTS
DIL, BHCS/GR, Mugi .'Do--Drill ~Cuttings '
5~/./ ~ T,TL~, Operations Manager pATS 9/25/69
sms~ ~. ~Jl' [c~[~ .... ~ ,. . ' . .. .
*(See Instructions and Spaces for Additional Data on Reverse Side)
i/
INSTRUCTIONS
General: This ~._.orm is designed for submitting a complete and correct well completion report end log on
all types of lan:3s and leases in Alaska.
Item: 16: Indic~te~hicl~elevation is used as reference (Where not otherwise shown) for depth measure-
merits given ~in'-~th~e'r~sp~Ces on this form and in any attachments.
Items ]0, anci:'.~2::~:if this well is completed ~for separate production from more than one interval zone
(multiple c6m~:ieti~n'), S-° state in item 20, ;and in item 22 show the prcJucing interval, or intervals,
'top(s), bott°m~) and na'~e (s) (if any) for only the interval reported in item 30.-Submit a separate report
(page) on thisilform, adequa~tely identified, for each additional interval to be seperately produced, show-
ing the additional data pertinent to such interVal.
item]f: "Sacks Cement": Attached supplemental records for this well should show the details of any mul-
tiple stage cementing anct the loCation of the cementing tool.
item 2~: Submit a separate completion report on this form for each interval to be separately produced.
(See instruction for items 20 and 22 above).
· · , ,
~4. SUMMA_~Y"~)~ FO~W~TION TESTs iNCLUDIN(~ ,NT~Rv~L'TF-STED. pamssul~. DATA AND 'p, Eco¥.~iJES OF OIL. GAS,
wATER AND MUD =
NAME
M~AS. DL~-q~TI~ T~HU~ VERT. DlriPTlt
. :
, : ' Basal Cretaceous Approx. Approx.
Unconformity 6830 ' 6820 '
.
; Top Triassic
sands 8599 ' 8588 '
: :
~ Top Shublik Fro. 8628' 8617'
·
Top Sadlerochit
Formation 8707 ' 8696 '
, ,
,
LITtloLO~Y.
POBOSITY,
FIR A C'TURF-~,
APPAB. ENT
361 CORE DATA, ATTAcII BRIEF DESCRIIPITIONS OF D,PS
: AND DETEC~I~I) SltOWS OF OIL, GAS OR WAT]glR..Tn~o~Parmo_______-
, .. ' ' Triassic shale 9308' 9297'
NIL
i :
:
,
BP ALASKAINC.
Put River #01-11-12
API #50-029-20042
Permit 69-78
WET,T, HISTORY
Spud 17-1/2" hole @10.15 hrs 7/21/69. Drilled to 979'. Ran
13.-3/8" 61# K55 csg to 928'. Cemented w/ll60 sxpermafrost
on 7/25/69. Fitted and tested B.O.P.'s. Drilled 12.-1/4"
hole to 4105'. Ran full suite of Schlumberger logs. Ran
9-5/8" 47# N80 csg to 4087'. DV tool ~1611'. Cemented
first stage w/720 sx class G, second stage w/685 sx class G
cement. Fitted and tested B.O.P.'s. Drilled 8-1/2" hole to
8921'. Ran Schlumberger logs. Drilled to 9397'. Relogged.
Ran 7" 29# X-line csg to 9366',~D.V. tool @5073'. Cemented
first stage, w/600 sx class G. 18% salt, second stage w/390
sx class G 10% gel.
CORING
NIL
TESTING
NIL
VELOCITY SURVEY
NIL
Rig released @0600 8/30/69.
D~V~$~ON OF 01~. AND GAS
,,
TEST DATA
DST #1 (9055-60' RT~)
The interval was tested through perforations in the 7" casing using con-
ventional drillstem test equipment. The well was open to flow for 15
hours 49 minutes. Initial production rate was 34 b/d which fell to 20 b/d
after 14 hours. Recovery was approximately 5 bbls of viscous black oil
13.8°API at 60° F and 5 bbls formation water salinity 19,000 ppm. Nall.
Pressures at 9007' RTKB (psig)
Mud Pressure IFP FFP FSIP Mud Pressure
5362 ~' 3280
Flow Test 1 (~894-9008' RTKB)
3477 4066 5345
The interval was tested through perforations in the 7" casing. The well
flowed intermittently at rate of approximately 150 b/d. Oil gravity was
24.2°API. No steady bottom hole flowing pressure could be obtained.
Flow Test 2 (8966-8982 and 8994-9008' RTKB)
In order to obtain a satisfactory flow rate an additional 16 feet was perf-
orated above the interval tested in Flow Test 1. The following pressure
data was obtained at 9018' RTKB during the subsequent flow test.
BHCIP @ 9018' WHFP BHFP Flow Rate
psig psig psig b/d
4450 130 2613 approx. 2300
Oil gravity was 25.7°API.
Flow Test 3 (8822-8887' RTKB)
The interval was tested through perforations in the 7" casing. The initial
perforations resulted in lower productive capacity than had been expected
and the zone was reperforated in two sections. The following pressure data
was obtained at 8733' RTKB from the final test.
BHCIP @ 8733' WHFP BHFP Flow Rate
psig_ ps~g Psig b/d
4358 480 2785 12,500
Oil gravity was 26.3°API.
DIARY OF OPERATIONS
April- 1970
1- 3
Completed rigging up.
3- 24
The 7" casing was partially collapsed at the following intervals-
110', 236', 371', 415', 500' and 631'. The damaged sections were
milled out and the casing was inspected with logs. The casing was
removed down to 1922'. DUring the milling operations the 9-5/8"
casing was damaged, at 110'. The 9-5/8" casing was cemented to the
surface with 360 sacks of cement. Excess cement was cleaned out
and a new string of 7" casing was run with a casing patch. After
matching to the cut off casing at 1922' the casing was cemented to
the surface with 350 sacks of cement.
24- 30 Drilled bridge plug at 2500' and cleaned out to 3270'.
30 - 2 May- Cleaned out to 9313'.
- 3
Ran GR/CBL/CCL. Perforated 9055' - 60'.
3- 5
Carried out DST #1. Conditioned mud.
Set bridge plug at 9040'. Set production packer at 8950'.
7- 11
Ran tubing, made up and tested wellhead. Perforated 9000' - 9008'
and 8994' - 9002'. Flow tested well.
t.t- 14 Perforated 8966' - 8982'. Flow tested well.
14- 16
Killed well. Pulled tubing. Recovered production packer. Set
bridge plug at 8945'.
17- 21
Ran open ending tubing with bell nipple to 8766'. Perforated
8822' - 87'. Flow tested well.
21- 23 Reperforated 8850' - 82'~ Continued testing.
24- 26 Reperforated 8822' - 54'. Continued testing.
26- 31
Killed well. Pulled tubing. Set production packer at 8710'. Ran
tubing. Made up and tested wellhead. Washed in tubing. Flowed
well briefly to b~urning pit. Set plug in profile above the sliding
sleeve. Bled off all pressure from tubing.
31 May-Released rig.
Casing
2O
13-3/8
9-5/8
7
BP 01-11-12
Wt/Ft
Grade
Depth
50
61
47
29
J55
N80
N80
928
4087
9366
Stage
1
DV
1st Stage
108 sacks Permafrost
-- 1240 sacks Permafrost
1612 720 sacks G
5066 600 sacks salt sat. G
2nd Stage
685 sacks G
390 sacks G/
10% Gel
.GAMMA RAY
Jgq UNIT$
BP WELL M-1 (01-11-12)
SPONTANEOUS-POTENTIAL
millivolts
- o
t0
RESISTIVITY
ohms. m2/m
LATEROLOG-- 8
10 ' 100
i i
,~1t~ INDUCTION LOG
.
10
DEF..P INDUCt'ION LOG
to · To Too
. INTERVAL.
TRANSIT TIME'
MICROSECONDS PER FOOT
I
~p of Sadlerochi::
8664' $.$.
Telescopic --
8679 ' BKB
'N' Nipple
8709 ' BKB
permatrieVe
8710
P~oposed ~
~dditiOnal
Perforafions
8760' BKB
'66 - 8794' B.~B
8804 ;18' BKB
· .
I
, I.
't
WELL M-1 (BP 01-11-12) - OUTLINE FLOW TEST pROGRAM - (Continued)
NOTES
1. The gauges will be suspended on wireline for all flow periods:
a 2-7/8" 'ho.blow' tool must be run above the gauges at all times.
2. The well is not quite vertical: although the RTKBE is 41.23 ft.
a.m.s.1., at 8800 ft. S.S. the Schlumberger DIL depth-is 8852 ft. BKB.
3. The strength of the gun positioning magnets must be checked before
each perforating run. Two magnets should be run on each gun, one
at the top and one at the bottom.
4. No wireline runs (tools or gauges) should be made whilst ~he well
is flowing.
5. The wireline weight indicator must be watched carefully every time
the well is opened up to flow. It is unlikely that the gauges will
'float' in 7" casing at a maximum rate .of 6000 B/D, but the drag
the wireline in the 2-7/8" tubing will help_ lift .the gauges.
·
6. The annuli pressures should be observed and controlled throughout the
res tS. '
?. All depths quoted for gauges refer to the pressure sensing- element
of. the I~3, regardless of what other ins t~ents are z~ ~ith it..
8. Pressure Testing. Whenever a screw thread is broken/made up, it
must be repressure-tested.' Pressure seals held by 'O' rings
(e.g. lubricator) need not be tested every time, but should be
imspected when the wellhead pressure is applied.
9. RPG5 Evaluation. We shall rent an RPG5 pressure gauge for evaluation.
Before this trial gauge is run in the well-it should be carefully
calibrated hot and cold in both ascending and descending pressures
with the Budenburg in the base. lab. It must always be run in
combination with an RPG3. After the flow test' the hot and cold
calibration procedure should be repeated. It is important that all
data gathered is retained as a report, on the gauge will be written
for submittal to London and other BP operating areas - this also applies
to the Crelad Spinner flow meter. - -
_
· 10. Ail surface pressures and temperatures should be continuously recorded
throughout all tests (the pressure 'recorders should be calibrated
about 7 times per week and the calibration charts retained). Temperature
accuracy is of equal importance. .
11 Separator ,~easurements. Whilst flowing through the separ, ator flare
line pressures should not be recorded. All rates 'and measurements
are to be corrected in ~he field (to 60° F., using meter factor of ·
0.915) and only corrected values should be reported. However, all
basic recordings (totalizer counts, orifice meter readings) should be
retained, whatever their appearance.
12. Surface Pressures. ~nasa (W%{P and flareline pressure) should be
measured with a D.W.T. at approximataly-hour!y intervals, although
obviously this will not always be possible. The frequency should
d~pend on the length of flow period/PBU and the accuracy of the
surface recorders.
B. E. Davie~?
May 3, 1972
WELL M-1 (BP 01-11-12) - OUTLINE FLOW TEST PROGRAM - (Continued)
PROGRAM OUTLINE - (Continued)
- r
10. Repeat Steps ~, ~ and ~ but suspend the gauges at 8740 ft. BKB.
11. With well closed in, run RPG3 and RT7 and record a B,H. pressure
and temperature gradient.
12. Run in with an RPG3 and-Crelad Spinner flow meter - a 'no blow' tool
must be run above the RPG3. When the tools are below all perforations
flow the well at c. 4000 B/D and when conditions are steady run a
survey across the perforations. Do not try to enter the tubing with
the well flowing.
13. Shut in well and pull flow mater.
14. Rerun gauges.
1§. Flow well at two rates, % maximum and maximum for 6 hours per rate.
· ' 16. Shut in well and pull gauges.
End of Test.'
- p
-
·
1
WELL M-1 (BP 01-11-12) - OUTLINE FLOW TEST PROGRAM
PRESENT STATUS
7" (29# casing from TD to surface.
7" bridge plug sec at 8945 ft. BKB,
Perforations 8822 - 8887 ft..BKB.
·
7" Permatrieve packer 8710
2-7/8" Hydril CS tubing from Permatrieve packer to surface wi~h:
N nipple
Tubing telescopes
Otis S.S.D. (X0)
Otis DW plug
8709 ft. BKB
8679 ft. BKB
8648 ft. BKB
7714 ft. BKB
Oil to surface in 2-7/8" tubing, brine (10.2 #/gallon) to surface in the.
·--" . 2-7/8"/7" annulus.
. .
.Note: 8800' subsea is equivalent to 8852' BKB.
·
TEST OBJECTIVES
1. To determine by reperforating whether the present 1°w P.I. is due to
partial penetration of the original perforating guns.
.
To measure the increase in productivity obtained from additional
perforations. '
.-
: "'~PHOGRAM OUTLINE °
.
· L1. ~ull DW plug from 2-7/8" tubing at 7714 ft. BKB,-taking care that .~ -pzessure is equalized across the plug. .
4'
4
.
8~
Rrm 2-1/8" gauge tool to check tubing clear of obstruction; run a
--pressure/temperature survey taking 500 ' stations from 3500 ' to 8000 ' 'BKB
' 'l]~d 100' stations from 8000' to 9000' BKB.. . .. ' '
Run 'through-tubing' GR/CCL. Tag bottom and record' collars in the
7" c~ing and 2-7/8" tubing up to 8600 ft. BKB.' -
Run gauges and suspend at 8800' ft. BKB; flow well for 6 hours to confirm
.
pres en t low P. I.
Raperforate 8822 - 8887 ft. BKB (GR) with 4 spf 2" Hyperjet guns.
~,~ gauges and suspend ac 8800 ft. BKB.
Flow well at ma_~mum rate for 6 hours °through separator, collect
.s~parator oil and gas sampias and stock .tank samples, measure GOR, and
.~I gravity.
Shu~ in an~ retard PBU for 12 hours.
Perforate 8S04'-8818 and 8765 - 8794 and 8750 - 8760 f~. BKB (GR)
wi:h 4 spf using o" -~ ~- '
- n5 ~=rJc~ guns.
Form No, P---4
REV. 9-'~0j67~
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUBMIT IN DUPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
APl NU~ERiCA.L CODE
API 50-029-20042
6. LEASE DESiGN'A~--ION AND SL-"IRIAL NO.
ADL-28260
1. 7. IF INDIA]~, ALOTTEE O]{ TRIBE NANIE
O,L~,L,~ [] G.,,~.,..~ [~ OT~. Appraisal
2. NAME OF OP~L~TOR
BP OIL CORPORATION
3. ADDRESS OF OPERATOR
P. O. BOX 4-1395, ANCHORAGE~ ALASKA 99503
4. LOCATION O'F WELL
..
458' WEL, 1998' NSL, Sec 1, TllN, R12E, UPM
8. L~'IT,F.~RA{ OR LEASE N.~ME
Put River
9, WELL NO.
BP 01-11-12
10. FIELD A_ND POOL. OR %VILDCAT
I1. SEC., T., ~., M2 (~O~OM HO~
o~~
Sec 1, TllN, R12E, UPH
12, PIgR/VIIT ATO.
69-78
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING ANT) CE1VIENTING JOBS INCLUDING DEPTH
SET A/WI) VOLU/VfES USED, PERFOfiJkTIOHS, ~-ESTS ANT) I~ESULTS, FISHING JOBS, jLrHK I/~ HOLE A/~D SIDE-TIRJkCKED HOLE
AHD ANY OTFiER SIGNIFICA2qT CI-IA_~GES IN HOL~ CONI)ITIOHS.
STRICTLY 'CONFIDENTIAL
August '1969
August 1 - 2
3 ' 18
19
20 - 25
Logged well. Drilled to 4105'. Ran and cemented 9-5/8" casing
at 4087' with 1405 SackS Class G cement. Nippled up.
Drilled 8-1/2" to 9821'. Ran directional surveys at 4300' and
6941'.
· .
Logged well.
· .
Drilled 8-1/2" to.9397'. Logged well. Conditioned hole for
casing.
26 - '28
Ran and cemented 7" casing at 9366' with 600 sacks of salt sat-
urated cement and 390 sacks of gel cement. Nippled up.
29 - 30
Cleaned out to the fIoat collar and suspended as per Sundry
Notice Application of. August 20..
Rig' releaSed 'at '0600 'hOurS; 'AUgUSt' 30; ' 1969.
DIVISION OF OIL AND GAS
ANCH0~O~
Attorney'in-Fact nx~ September 9, 1969
NOT£--Report o~ t~is form i5 required for each tale,dar too,th, regardless of the status of operatioms, amd must be file~ i, duplicate
with the Divisio, of ~i.es & ~inerals by the 15th of the succeedi,9 mo.~h, u,less othem~ise directed.
J
SPEER¥-SUN WELL SURVE¥INB
P.O. Box 620? Annex
Anchorage, ~laska 99502
cH~L~s ~. ~^wK September 3, 1969
PRESIDENT
C O MPANY
JOS. T. WILSON, JR.
SECRETARY-TREASURER
Mr. Mike Allen
BP ALASKA INC.
P.O. Box 4-1395
Anchorage, Alaska
Dear Mike:
Re: Our Gyroscopic Mult_~shot Directional
Survey No. SU-3-16505 on Well No. 01-11-12
North Slope of Alaska.
We are pleased to submit the original and four (4) copies of our Gyroscopic
Multishot survey of the above well surveyed from 6400:' : to ~. 9300'.
The original surVey folder contains the tabulation sheet, time sheet and film.
Also enclosed are the IBM cards used to compute the survey.
We appreciate this opportunity to be of service to you, and we hope our
services warrant your continued confidence.
Yours very truly,
SPERRY-SUN WELL SURVEYING COMPANY
Ted J. Ashby ~
District Manager
5 Enclosures
SURVEY REPORT
FOR
·
BP ALASKA INC.
TYPE OF SURVEY: Surwel Gyroscopic Multishot
SURVEY DEPTH: FROM
L~SE 01-11-12 '
FI£LO: North Slope
Surface
FT. TO 9300 FT.
COUNTY/PARISH
DATE OF SURVEY
North Slope
August 30, 1~6~
OFFICE: A,nch°,rag.e.,~ Alaska
Alaska
, STATE
_ ~OB NO. ...... SU-3-16505
BP A]~ KA~ INC.
WELL N0. 01-11-12
S U R-~E-'¥-'--D A T-E----
NORTH'SLOPE
VERTICAL. SECTION COMPUTED ALONG--C~LOSURE
ALASKA
SPERRY-SUN WELL SURVEYING COMPANY
SU- 3-16505
RECORD OF SURVEY
TRUE INCLINATION DIRECTIOI~ DOG-LEG
R E C T A N G U L~-~-C-OOR DI-'NATE-S
MEASURED VERTICAL
SEVERITY VERTICAL
DEPTH DEPTH.
DEG MIN DEG
DEG/iO0 SECTION NORTH SOUTH EAST
WE'ST
O, 0.00 ORIGIN AT THE SURFACE
0.00
0,00
100. 99.99
0 15 S 39 E
0.00 -0.33 .
-0.33 0,27
200. 199.99
0 0 S 0 E
0.25 -0.33
-0.33 0.27
300. 299.99
030 S-3 W
0.49 -0.44
-1,21 0.22
400. 399.99 .
0 30 S 38 W
0.30 -0.03 -1.89
-O.3O
500. 499.98
0 30 S 14 E
0,43 -0.39 -2.74
-0.09
600.. 599.98
0 0 S 0 E
0,49 -0.39 -2,74
-0~-09 7.
700.' 699.98
800. 799,98
0-30 S 7 W
0.49 -0.44 -3.61
0.49 -0.44 -3.61
0 0 S 0 W
-0.20-
:
900, 899,98
0 15 N 56 W
0.25 -0.04 -3.36 -0.5-6
1000. 999,98
0 0 N 0 W
0 · 25 -0 · 04 -3 · 36 - 0-;-56
1100. 1099.98
0 0 N 0 W
0.00 -0.04 -3 · 36 -0-.-5-6
1200, 1199,98
0 0 N 0 W
0.00 -0.04 -3.36
1300, 1299,98
015 N 24 W
O. 25 O. 20 -2.96 -0.74
1400. 1399.98
0 O' N 0 W
O. 25 O. 20 -2.96 -0. ?$
1500. 1499.98
0 15 S 70 W
0.25 0.57 -3.1I ---1-71-5'- -
1600. 1599,98
1700, 1699,~98
0 0 S 0 W
0.25 0.57 -3.11
0.00 0.57 -3.i-I
0 0 S 0 W
1800. 1799.98
1900, 1899,98
2000, 1999.9'7
015 N 20 W
0,25
0.79 -2.70
0.79 -2-27O
1.54 -2.12
0 0 N 0 W
0.25
0 30 N 48 W
0.49
- I:-30 ...... i '
- I-;-9-5- - ! -
2100. 2099.97
~°O0,..r. 2199,97
2300~ ........ ~99.62
0 0
0 30
4 45
N 0 W 0.49 1.54
N 87 W 0,49 2,40
s-- ?d~'~- .............. 4'-;~V ............... ~) ;55
- 2J1-2' - I T9'5-
- 2-.-07 - 22-82
- 4 · '9'I - i-0-.-6-0 -'-
BP--AL
-~~OHTH_SLOPR
VERTICAL
P-A-( --2 .....
~ ,
AUGUST 29, i969 S~O-RVE'Y--OATE--
SEC-T-I-ON- COMP'UTE-D--AlONG CLOSURE ....
-~ALASKA
' 9
SPERRY-SUN WELL SURVEYING COMPANY SU-3-165-05
RECORD OF SURVEY
TRUE INCLINATION DIRECTION DOG~LLEG
MEASURED VERTICAL SEVERITY
DEPTH DEPTH. DEG MIN DEG DEG/IO0
V E R t I--C-~-L
S E CT-iO N
R ECI~N-G-OL-A R--C 00 R D I N~TES
N OR-T-H---SOO TH .... EA S T .... W EST---
2400. 2398,77 7 30 S 81 W 2.97
21.87 -6.95 -2'3.49
2500, 2497.97 7 15 S 80 W 0,28
33 · 71 -9 . 14 - 3-5~. 92 -
2600. 2597.33 6 30 S 82 W 0.78
44.46 --01~-71 -~7~-3
2700. 2696.68 6 30
2800.. 2796.09 6 15
S 83 W 0.11
S 81 W 0.33
2900. 2895.54` 6 0 S 82 W 0.27
55.27
65.'55
75.47
- 12~,09 - 5-8-J3-6-
-'1-3-;-80 - 69-;-1-2-
- 1-~5 -T~~
3000. 2994.99 6 0 S 82 W 0.00
3100. 3094.45 6 0 S 82 W 0.00
3200.
3193.90 6 0 S 84 W 0.20
8-5~. 4-O - 16~7-I : 8
95-~ 32 - 1-8~-1-6 - 100:I7--
l 05 · 36 - 1-9~'25 - 1 [0-; 57----
3300. 3293.44
5 30 S 85 W
0.50 114.60
- 2 D-;-O 9 -
- 20-789- - I29;'23-
- 21--7-6 - 13'9
3400. 3393.02
5 15 S 85 W
5 45 S 85 W
3500. 3492.51
0.24
0.49
123.43
13~.09
3600. 3592.01
5 45 S 83 W
5 30 S-82 W
5 0 S81W
3700. 3691.55
3800. 3791.17
0,20 --1-42,66
0,26 15~6
0,50 1-5-9-79-~
- 22:9-8 - :1-49-;- 1-5~
-2 4-[~-1 - 15'8-~-65~
-2-5-;-6-8 - 16-T;-2-5
3900.
4000. 3990.58
3890.83 4 45 S 90 W
4 0 N 68
4050. 4040.48
3 45 N 61
0.80
W 1,82
W 1,06
17~?
li~. 06
- 25;-6-8 - i 75~--53- -
--23~-07 - 18'2-.0-0-
- 2I:48 - I8 Zi:~-. 8-6
4100. 4090.38
4200. 4190.25
4300. 4290,11
3 30 N 57
3 0 N 51
3 0 N-44
W 0.71 1-8-0 .~-8
W 0-, 60 18-5%-4-7
W 0 · 3-6 1-8~72'
- 1-9-=8-2
- r6~-52
- I-2~-T6
- 1
- 1-9 I-~-49---- m -- ]
- I95-' I3 ........ : -
4400. 4389.99
4500. 4489.90
4600. 4589.82
2 45 -- N--38- W 0T-3-9 --1~-3:3-0
2 -3~ --'N-3-8---~ 0;-2 5--1-96~55
~- 15 N 37 W 'O-;-2B .......
-8-;98 -I98~,-08'
-5;5~ -200'-;76
-'~;WX ---'2'03'-YI3"'
._
<_. - ._.. -p-A-~--~-3 .... .._
BP A1 f~A INC. · , -"-
WELL NO. 01-11-12 ' AUGUST 29,1969 SURVEY D~[~~.. ~-
NORTH SLOPE VERTICAL SECI ION COMPUTED ALO'NG'-CL-O-SURE _'
A~S~ ....
SPERRY-SUN WELL SURVEYIN~ COMPANY SO23~-i~-508 ~'
RECORD OF SURVEY
TRUE INCLINATION DIRECTION DOG-LEG
R E C-T-~-~ U L A R C-OOR-OI
MEASURED VERTICAL SEVERITY VERTICAL
DEPTH DEPTH- DEG MIN DEG DEG/IO0 SECTION NORTH ~OOT~--E~ST .... W-~ST~-
4700, 4689.76 2 0 N 43 W 0,33 202,24 0.14 -205,51 _
0.24 204.76 2,96
2-07~-5-6
4800. 4789.70 2 0 N 36 W .-
4900, 4889,65 I 45 N 30 W 0,31 206,73 5,61 -2-0-9-~-09
5000, 4989,61 ! 45 · N 26 W 0.12 208.54 8.35 -2-1-0¥~-2--
10.85
5100, 5089-57
5200. 5189.55 1_ 15
1-30 N 17 W 0.35 209,74 -2]-[~19
12.92 -211,90
N 19 W 0.25 210,81
5300, 5289.52 1 15 N 22 W 0.06 211,91 1.4,94
5400. 5389.50 I 15 N 25 W 0.06 213.23 16.92
18.15 -2I'4~0g
5500. 5489.49 0 45 N 20 W 0.50 213.89
5600. 5589~48 0 45 N 37 W 0.22 214.85
19.19 -Zi%-T-~7 '
5700. 5689.48 0 30 N 39 W 0.25 215.51
19 . 8 7 -
5800. 5789.48 0 30
N 7 E 0.39 215.56 20.74 -2-15-732
5900, 5889,48 0 15 N 13 W 0,27 215,74 21,16
6000. 5989.47 0 30 N 2 E 0.26 215.86 22~03 -2[-5~9
6100. 6089.47 0 15 N 13 E 0.25 215.84 22.46 -21~-9
6200, 6189.46 0 45 N 18 E 0,50 215,66 ~3-~-,70 --2-1~-¥8-8---
6300, 6289,45 I 0 N 40-E 0,41 214,80 25.04 --~[3-~-.7-~ --
6400. 6389.43 I 0 N 50 E 0.17 213.68 26.16 -212~2
6500. 6489,42 0 55
N 52 E 0.08 212.62 27.15
6600. 6589.41 0 55 N 52 E 0.00 211.55
6700. 6689.40 0 45 N 83 E 0.47 210.30 28.29
- z TI7-1--6
-2 09%-9-0 ........
- 20B7.-60
6800, 6789,40 0 20 S 85 E
6900. 6889.39 0 20 N 1 W
7000. 6989.39 0 40 N 41 W
0,42 209,73 2~.24
0.49 209.84 ~782
0.46 210.75 29.7~--
- 2'0-8¥0-2
---20-8
__ BP__~L ,KA_INO
NORTH SLOPE
·
AUGUST 29,1969' S-O-R~E'~r-DaTE
VERTICAL SECTION COMPOTE-D---A-L-ONG-'CLOSURE .....
___ALASKA
Z
SPERRY-SUN WELL SURVEYING COMPANY SU-3-~6505 ..... ~,
R~CORD OF SURVEY :: '-
KEL~FANGU[ Al:t--CO 0 RD INA T ES
TRUE INCLINATION DIRECTION DOG-LEG
MEASURED VERTICAL SEVERITY VERTICAL
DEPTH DEPTH. DEG MIN DEG DEG/iO0 SECTION NO~TH--~OUTH----'E'A-S1 ..... WEST ....
7100. 7089.38 0 30 N 71 W 0.34 211.61 29.98 -2~g.62
7200. 7189.38 0 40 S 76 W 0.36 212.67 29.70 -2-I0-;-75'~
7300. 7289.37 0 35 S 57 W 0.22 213.41 29.15 ----2TI-.-61
7400. 7389.37 0 25 S 49 W 0.18 213.97 28.67 -2T2~'-I-5-- -i
"~
7500. 7489.37 0 20 S 71 W 0.16 214.37
28.48 -212-;-.70 ~
7600. 7589.36 0 25 N 89 W 0.15 215.09 28.49 -~~
7700. 7689.36 0 40 S 72 W 0.30 216.12
7800. 7789.35 0 30 S 51 W 0.26 216.69
7900. 7889.35 0 10 S 60 W 0.33 216.91
2-8~1-3 - 2 I'~'5 ~
27~5 9 -2 1-51-2'2
2'7~ -2 15-T4-7
8000, 7989.35
8100. 8089.35
8200, 8189,35
0 0 N 0 W 0.16 216.91 27.44 -2Y5~.~-----;
0 20 S 30 W 0.33 2i7.10 ~6~,94 -2I~5';-76 ~
0 25 N 49 W 0,58 217,73 27,41 -216~-3I :'
8300, 8289,35 0 30 N 63 W 0,13 218,56
8400. 8389.33 I 5 N 48 W 0.61 220.17 29.07 -218~--4-9-
8500, 8489.31 1 0 N 39 W 0.18 221.50 30.43 -~[g-~sg
8600. 8589,31 0 40 N 18 W 0.44 222.05 31.54 -2~9~95'
8700. 8689.30 0 30 N 20 E 0.41 2~2~[-;-,90 ~2,36 -219~65
~800. 8789,30 0 30 N 6 W 0,22 2-~2-;~,I4 33~3
8900. 8889.29 0 30 N 8 W 0.01 2-2-2.42 3--4-70-9 -219.--;-8-6
9000. 8989.29 0 30 N 29 E 0.31 222.14 34.8-5 -2-19;-4-4
9100. 9089.27 1 0 N 26 E 0.50 221.66 3~-2 -218~67~--
9200. 9189.26 1 0 N 0 ~ 0.44 2-2-1.98 3-8-,-1-/ -2-1-8W. 67 ......
.... 9-300~. .... 9-2~i-25- 0 50 N -I E 0.20 ---2-Z2~.0-6~ -3-9T6! -21B';50-
~:"~',"~ THE C ALC U-L-AT-IUN-~oRO-C~EOUR-E-S- ARE--8]~-S-E-ff-O~-T-H-E~]S-E--OF--THE--TANGENTI-AL--OI~-CFIORD--METHOD-~-~':~ --
79- OEG;---43 -M IN;--WE ST-(TRUE)
DIRECTIONAL SUF VEY
REPORT
FOR
BP ALASKA INC.
TYPE OF SURVEY' Surwel Gyroscopic Multishot
SURVEY DEPTH: FROM ~4050 ..... ~. TO. 61400. FT,
01-11-12
LEASF' - WELL NO.
FIELD: North Slope
COUNTY/PARISH North Slope STATF Alaska
DATE OF SURVEY ~u,g, llSt 10, 1969 JOB NO.SU-2-16hgh
Anchorage, Alaska
OFFICE:
SP-Z35C
Bo P. ALA,,K~,~
WELL NO. 01-11-t2 AUGUST 10~ 1969 SURVEY DA'iL-
NO,,I-H SLOPE ................. VERi'ICAL SECTION COhiPUT[':D ALONG
ALASKA
EE[- 'O- VE-YiNG CO 'PA-N-Y .........
RECORD OF SURVEY
ECTtON DOG-LEG
TRUE INCLINATION DtR ....................................................... RECTANGULAp, cOORDINATES
......... _M._E A S.U.R E__D_ .... __V__E R_._T_JC_A% ................. ] ................ S~E_~E R~ I !Y .... VERTi.CAL ...................................
DEPTH DEPTH DEG MIN DEG DEG/IO0 SECTION NORTH SOUTH EAST
. .
WE S1'
4050 4040 48 · · -
................... ~.t_QO_._ .... __q_o9_0_._~3_8_ ............... _!.. ~_D ............... N__5.Z_w ........... 0 ,_ O0..__] ....1_8.5,..35 ........................ _.-_ 19_. 81 -
4200. 4190.24 3 0 N 51 W 0.60 188.73 -16.52 -
4300. 4290.11 3 0 N 44 W 0.36 192.74 -12.75 -
~4q..O ........ 4.3_89.;~.9_9. ................... :2:..45 ................. N_~38_ .... W ............0.39 ........ 196._07 ................... -8.97, . -
4500. 4489,90 2 30 N 38 W 0.25 199.t0 -5.56 -
4600. 4589.82 2 15 N 37 W 0.25 201,77 -2.40 -
4800o 4789.70 2 0 N 36 W 0.24 206.74 2.97 -2
4900. 4889.65 1 45 N 30 W 0.31 208.53 5,61 -209.
_5_ O._O_O__: ....... 59_8!._.~6_ .1___]_ ........... !_._~.5_ ......... N__. 26____W ...........~.-___!2 ........2!_0__ :.!.5 ............8.35 ......................... -210.
5100. 5089.57 1 30 N 17 W 0.35 211.17 10.86 -211.
18,,.86
18~..41
191.48
195.12
198,07
200.76
203,'12
05.50
07.55
08' -
5200. 5189.55 1 15 N 19 W 0.25 212.09 12.92 -211~89
5300. 5289.52 I 15 N 22 W 0.06 ~ 213.11 14.94 -212.71
5400. 5389.50 1 15 N 25 W 0.06 214.23 16.92 -213.63
5500. 5489.49 0 45 N 20 W 0.50 214.81 18.15 -214.08
5600. 5~89.48 0 4~ ............~_~_ W 0.2~ ........ ~15,_7~ .............. 19._20 ........................................ -214.87
5700. 5689.48 0 30 N 39 W 0.25 216.32 19.87 -215.42
5800. 5789.47 0 30 N 7 E 0.39 216.30 20.74 -215"3~ ......
...................................................5900. 5889.47 0_!5 ............ ~_._I.~._W .......... 0_27 .... ..... 2.167.44 .......... 21..17 .............. -215.41 .......
6000, 5989,47 0 30 N 2 E 0.26 216.50 22.04
6100. 6089.47 0 15 N 1'3 E 0.25 216.45 22.46
~ 2 O_O._- ........... 6~ 8__9....-. ~l ............ ,'.~:~_._0_ ...... 0 ................... N .. :~_.8_ ~.E ............ 0 .. 2.5 ............ 216. ! 5 ......... 22.. 46_
6300. 6289.47 / 0 0 N 40 E 0,00 216.45 22°46
-215.38
,21-5,'2'8 ......
-215.28
-215.28
.. B ..... P .... ALAS.KA ~ lNG
WFLL MOo 0]-].L-12 ........... P,qGE'
/'~UGUST lot ].c~69 SUf<VEY [:,Al'E
. NOR1'H_~SLO_P_.E .................................... VEFtTICAL SECIION CO~qt:'U'iEl.) ALDNG CL['.,SURL
ALASKA
.
SPERRY-SUN WEL~]--~-U~-V-E-~;~NG' CoNpAN'y ............. sU_2_1'6494
............................................................... , ..........
TRUE INCLINATION DIRECTION DOG-LEG _ RE~TAt~ULAR CooRDiNATEs .....
......... _ME_ASUR_ED_ ...... V_.ER~]'_I_CA_L ............................................................. SEV_ERITY .... VERT I CAE
.........................
DEPTH DEPTH DEG MIN DEG DEC-/100 SECTION NORTH SOUTH EAST I/EST
...... _ ........... '
· ~ THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THE TANGENTIAL OR CHORD METHOD
HORIZONTAL DISPLACE,ENT = 216.~5 FEET AT NORTH 8~ DEG. 2 'I'N. WES~(TxuE) ......
........ . ............ . ...... . .................... _ ......... ~ ............., ................................ ' ....., .
......... _ ....
................
CHARLES E. HAWK
PRESIDENT
-SUN WELL SURVEYING
P.0. Box ~207 Annex
Anchorage, Alaska 99502
July 6, 1969
C O MPANY
JOS. T. WILSON, JR.
SECRETARY-TREASURER
Mr..Mike Allen
BP OIL CORPORATION
P.O. Box 4-1395
Anchorage, Alaska
Re: Our Gyroscopic Multishot Directional
su~ey No. SU-3-16493 on the 01-11-12
Well, North Slope, Alaska
Dear Mike:
We are pleased to submit the original and four (4) copies of our Gyroscopic
Multishot survey of the above well surveyed from surface to 4050 ft.
The original Survey folder contains the tabulation sheet, time sheet and film.
Also enclosed are the IBM cards used to compute the survey.
We appreciate this opportunity to be of service to you' and we hope our
services warrant your continued confidence.
Yours very truly,
SPERRY-SUN WELL SURVEYING COMPANY
District Manaker
,1
..
SURVEY
FOR
REPORT
BP OIL CORPORATION
TYPE OF SURVEY: ..... Surwe!,GyroscOpic Multishot
SURVEY DEPTH: FROM
LEASE: 01-11-12
FIELD: .. North Slope
0 FT. TO
ho~o
WELL NO.
FTe
COUNTY/PARISH North Slope.
DATE OF SURVEY August
OFFICE: Anchorage, Alaska
-lOB NO,
Alaska
STATF
SU-3-16493
BR.I ZI SH__P E TROLEUM_QI L__C ORPOF~AI'I ON_ ._USA
01-11-12
NORTH_ __S L OP_E_
.
ALASKA
8-4-69
V ER.T ICA L_S ECII ON_._COMR UT ED
700.
PAGE 1
SURVEY DATE
ALONG_CLOSURE .... .
SPERRY-SUN WELL SURVEYING COMPANY -' SU-3-16493
.
RECORD OF SURVEY
TRUE INCLINATION 'DIRECTION iDOG-LEG - =RECTANGULAR COORDINATES
.
_.MEA S UR_ED ..._V_E R_TLI_C_AL '_SE_V~ E.R!_TY_ .... YE R_T=I_C A L
DEPTH DEPTH DEG MIN DEG DEG/100 SECTION NORTH SOUTH EAST WEST
O. 0.00 ORIGIN AT THE SURFACE 0.00 0.00
10.0_.____ ~ 99_._99__ .0___15 $__3~_E ......... _O_._QQ_ --0.23' -0,_3~ ..... _0_,2_7.
200. 199.99 0 O' S 0 E 0,25~ -0.23 0.33 0.27
300' 299.99 0 30 S 3 W 0.49 -0.08 -1.21 0-~'-~"~
.............. 40_0., ......... _.3_9___9_,_9~ ........ L ...... 0~.._~0. ............ S..3:8_. W .... ._~ .... 0~. 30 ............... 0 .... 5.2 ...................................... ~'_!_- 8.9_ ............................ 70 · 30
500. 499.98' 0 30 S 14 E . 0;43 0.~1 -2.74 -0.09
599.98 0 0 S 0 E 0-49 ,--0.41 '= -2.74 -0.09
699.98 0 30 S 7 U 0 -_49 ............ 0_- _6. ]._ .............................. _-3._:.6! ............................
800. 799.98 0 0 S 0 W 0.49 0.61 -3.61 -0.20
900. 899.98 0 15 N 56 W 0.25 0.95
I100. 1099.98 0 0 N 0 W 0.00 0.95
'.._.-._3.,_36 .......................... _,0 · 5 6
-3.36 -0.56
..........
1200. 1199.98
.................. ! 3__0~ ...... !_2__9 ~.__9_~__~
-1400. 1399.98
0 0 -
0 0
0.00 0.95
o. 2 5 !_._~_8._
0.25 1.08
1500. 1499.98
0 15
S 70 W 0.25 1.50
-3.36 -0.56
- 2., .9..6 ............... _~ ....... : 0,,.~7_~
-2.96 -0.74
1_60 Q_._ _
1700. 1699.98
, , _:0 0____ _S___O_H 0_.25__ L._50
0 0 S 0 W 0.00 1.50
-3_ _.._1_1__ -.1 _._ 1_5
-3.11 -1.15
1800. 1799.98 0 15 N 20 W 0.25 1.60 -2.70
................... 1900. _!8~_.,_98 Q ..... D_ N 0 W 0._2.~ ............ 1.60 ........................:.2_,70_
2000, 1999o97 0 30 N 48 ~ 0.49 2,18 -2.12
......... __.-_!_..30
-1.95
2100. 2099,97 0 0 N 0 W 0,49 2.18 -2.12 -1,95
.................... 22~0., ....... 21~.;97 0___.3.0 .......... N._!.7...N .............. 0,59 ................... 3~._04 .............................. _.=2.07 ......... ~ .............. =2.82
2300. 2299.62 4 45 S 70 W 4.29 11.09 -4.91 -10.60
............ B_RIT! S.).-I~,.P.E_T_R.O_L_E_U~_.O_I.L~ CORP_ORA.!I_ON USA ................................. ........................... PAGE 2
01-11-12 8-4-(59 SURVEY DAlE
......... NOR_I'H__SLOP.E .......... i .............. ' '" ......................... ] ................. VER~I_C.A_L. SECTION C.OMPUTED_ ALONG .CLOSURE .......
ALASKA
TRUE INCLINAT
~E~SUKED__~_E.B~ICAt
DEPTH DEPTH DEG M
_
2400. 2398.77 7 30
2600, 2597,33 6 30
ION
IN
SPERRY-SUN WELL SURVEYING COMPANY SU-3-16493
.
·
RECORD OF SURVEY
.
DIRECTION DOG-LEG RECTANGULAR COORDINATES
.$E~E. RI~Y__~E~I._CAL .... -.._ ' .... ~.
DEG DEG/100 SECTION --NORTH SOUTH EAST WEST
S 81W 2,97 24.14 -6,95 -23,49
$_~_W 0.28
·
S 82 W 0,78 48.05 -10,71 -47,13
2700. 2696,68 6 30 S 83 W
.......... 2_80__0_. ...... __22 Zg~_.___O~_
2900. 2895.54- 6 0 S 82 W
0.11 59.37 -12.09 -58.36
0.33 ..........70_,_25 .............................. :_13.80 ................... -69.12..
0,27 80.70 -15.25 -79,47
3000. 2994.99
~IQO~ ......... 3~94.45
3200. 3193.90
3300. 3293.44
3400. 3393.02
3500. 3492.51
6 0 -89.82
6 0 -100.17
-110,57
6 0
S 82 W 0,00 91,15 -16,71
S_.82~ .W. ................ 0_.-_ 0_0 ............... 101-_60 ........................... ..-..1_8.16
S 84- W 0.20 112.05 -X9.25
.
5 30 S 85 W
5 15 S
545 S 85 W
. -20,09
0,24~__ !3Q~Y8. ................................................................ -20.89 '-129.23
0,49 140.79 -21,76 -139,21
3600. 3592.01.
370.Q~ ..... _3691.55
3800. 3791.17
-545
5 }0
5 0
S 83 W 0,20 150,81
_.S_8. ~__ W ...... 0 · 26 16_0,_ 3?_
S 81 W 0,50 169,10
3900. 389'0.83
4000. 3990.58
4 45
4 0
S 90 W
N 68_W
4050. 4040.48
3 45
N 61 W
-22.98
-25.68 . -167.25
.,
1.82 183.45 - 2_3... 07___._ =!_8.2 ._00 ......
1.06 186.11 -21.48 -184.86
...................... ~__~_~_,~_~__T_~_E__.~.L_~CU_LA]'__I_.[}_N._ _P_~C_EDUR_ES..?_R.E_.B_.~_S_E D___OI~__T.H..E._U__S E.. O.F'.._...T._ HE .... TANGENT I AL. OR._ C EIORD._ .ME THOD
..
--
HORI~.O_NT~A~L---D.~I__S._P EA..C_ ~_MENI'__= ...... !_86 ? 11 ...... F.E.E.I_ A.T_ S.OUT~H .... 8_3 ...... DEG.._ ..... 2.2.~ M I N._ _WES T {.TRUE_)_ ......................
I i ' i~. It111!11 - 1 i I I !I 'i~ I_LLLJ_L.~ ~ ~ ~ I ~ I ~ , I1! ~ !!~i-l-L~--i-l--l-L'I'1 '11-1~-[ I-"-'! i-Fl
~ ~1 It11 I ill I i I\ ~ !~ I -!1ii111 I'! ti! i Ii I ! -~]l_J I I .I_MM_ _I4._I__~_!._L_L!~L_-~-LZ-_'iZ I_-E";. I!_-:~-
-'1 I
I I I
,,, ~ I1 I I . ,~, , ,,, , ,, , .. , , , ,. ,,, ,,,, , i~i .....
- ' ' ~' ' ] ' -- ' ' ' '~ : * ' i '~ ;' ~ ~ ' ' : " ; " .... ! ' '
RI ii I ' il ii Ii i I ~1 iit i!!, i~l! i!~.~ II l !! ~_.,~i _LLLL_ _Li j t_
TIT, ....
r F
II
!i!
I ' '"'"-'-'""" "'"'" """
· I ~ i I"'I I ~ ! i11i I Iilli!1 II1! ti !.I_LI!_ '~ i
!' !1 iI' II , Ii ! t Ii l i-ill Iii Il!il, l i!! 'ijX~.~.~J_M_LJ_iI__L~ J_ 117!_-L~_'--iF-
I ,, ~ ! ,I ,, ~ ; I 1,JL, ,, ,~,-~,~,, ,,! , Il_ ,~ , ,
' . I , , _ t ~ U_~ ; _ '~~~' . .. ;~ : , : ,_~~ .~ . ~, . !'I--r-F-~.Z.Tj-I--I-!--F.. ~
' t!1 Itt ' .I I I I ~z.~ ~ ,! ~' '~~'~"' ,~ "ii!l!l '~'!!!! ' t~; _ ~~~~' !'.__~__. e~~ i!l!
· ~ZFTj _I-i-I-L~--,
!,, I! i'I ,,~,,,,,~-~,,,, ,,,, , , ,,, , ~,,,, ~FF.,'.r: ! ~-n-n-'l ....
' ' ~ ~ I I .,, , I i I ~ . _
! i ---
~'-tF[-t -' , 1_
Il 'i' I I I i Il i ILl ! I i, ! Ll!i, L i~i~l__l~_
I I I ' I I i ~ / ! ! I I t//1_!
I! Ii, I .,,,' . , t , , ,,, ,, ,, , .i ,, , , ~-~,, , ,- IH-,!-4-it-I~
, .,,,,, ,,,. ,, , , .,. ,.._,,, , ,
I I .~'' L ' : Fil -
!~ll! !I"ilt!~ - - ~ , , t ,, , , F ~ 1_~. ~---t-i-H
iiii'I , , ,,,, , , , , , , ,_, ,_, ,L
I 1 i l II ! ! Iii ~ i I!i!!ll I . !1 ! I!---F I I t-'
. _L I_L~X
'""' ' !
1
t iiI ,''i ~ I i ~ I i ii ,' ' t ~i. LL ~ i-iti
rl I I-1--ITl-T, -
,,,,,, ,, ,',,, ,,, ,, ,,,, , ,,,, ,,
Ii1!
i I · I ~ ~ i'i i ~ i ~ . -l- ILL i J~_LJ IL i
, , II ,, ! . L_~t~~-~,,.,_~! ,~:~'--~ ,
!11 i
~ ~! I !~iii i~ili i "f-'F , --i-~ - i - ~ i i i i i 14-1 ~-it-iJ-:H--~-j~-Fi-i L'
il;l t~ill i I t ! ~ i i ' t I !1
[ ! I '" ........ ~'-*- -'
ii!! i:~ i II .i! i ii- ~ I It ,-. - .~ i ~ . . / I/! ! ' ! /
t,, I i ,,,,
. , t i I ! I i i I ~ ! i , i ~ i i ~ _ I J4_.l~ i l i i-/~l._~_,~ -I i i_L
I I I i i i i I , i i , ~ I I I i I F- I i j_i i[ 41-t i~-j-I/~i_-'t-Eq~_~//LTF~l-i'
I
I
! ii!
i
i'~!---/|1 !
A-00447
BP ALASKA INC.
P. O. BOX 4-CCC
121 WEST FIREWEED LANE. SUITE 205
ANCHORAGE. ALASKA 99503
TELEPHONE 277-1422
August 29, 1969
State of Alaska'
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Thomas R. Marshall, Jr.
Chief Petroleum Geologist
Gentlemen:
We enclose herewith Application for Permit to Drill Well BP 18-10-15, which
was previously submitted to you on August 15, 1969, and approved by Mr. Homer
Burrell on August 19, 1969; a Sundry Notice form advising of our intention to
suspend Well BP 19-10-15, which was previously submitted on August 15, 1969
and approved by Mr. O. K. Gelbreth, Jr. on August 27, 1969;. a Sundry Notice
form advising of our intention to suspend Well BP 01-11-12, which was prev-
iously submitted on August 20, 1969 and approved by Mr. O. K. Gelbreth, Jr. on
August 22, 1969.
These three forms were signed by an officialof BP Alaska Inc. after August 1,
1969 on behalf of BP Oil Corporation without the authority of Power of Attorney
from BP Oil Corporation, We therefore request that these applications be re-
granted by you in their correct form as now presented.
HJC: hw
Enclosures
cc: Mr. P. Hardwick
Very truly yours,
BP AL .
7//!
Operations ~M~anager
Form
REV. 9-30-67
STATE OF ALASKA
OIL AND GAS CONSERVATION ,COMMITTEE
Submit "Intentions" la Triplicate
& "Subsequent Reports" in Duplicate
SUNDRY NOTIC'ES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir
Use "APPLICATION FOR PERMIT--" for such proposals.)
0IL
WELL ~-~ GAS
WELL [~ OTHER Appraisal
2. NAME OF OPERATOR
BP 0IL CORPORATION
3. ADDI~ESS OF OPEqlATOR
P. 0. BOX 4-CCC~ /~2qCHORAGE, AI.~SKA 99503
4. LOCATION O'F WELL
Atsur£ace 458' WEL, 1998' NSL, Sec 1, TllN, R12E, UPM
AP1 NU1W_F~IC~ CODE
API 50-029-20042
6, LEASE DESIGNATION A_ND SERIAL NO.
ADL-28260
7. IF INT)IA/~, ALLOTTEE OR TRIBE NA.M_E
ON~T, rAm~ OR L~SE NAmE
Put River
9. WELL NO.
BP 01-11-12
lO. FIELD A2~ID POOL, OR WILDCAT
Prudhoe Bay
11. SEC., T., R., M., (BOTTOM HOLE
OBJ~,CTIVE)
Sec 1, TllN, R12E, UPM
13. ELEVATIONS (Show whether DF, RT, GR, etc.
KBE 4.123' AMSL
Check Appropriate Box To l~n,di'case Nlature of Ntoti'ce, Re
12. PEPdVIIT NO.
69-78
:orb o,r Other 'Data
NOTICE OF INTENTION TO;
FRACTURE TREAT MULTIPLE COMPI,~TE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
SUBSEQUENT REPORT OF:
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(Other) Suspend (NOTE: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
_
15. D~:SCRUm ImOeOSED OR CO.MPLETED OPER~T~ONS""iCleaiqy' s~a'~e all pertinent details, and give pertinent dates, Including estimated date of starting any
proposed work. ·
We intend' to suspend our subject well pending design of production facilities and downhole
completion arrangements.
The well status will be as follOws:-
T.D. in 8-1/2" open hole approx. 9400 ft.
Last casing string 7" 29 lb~ft N80 X line set at T.D.
Cemented with approx, 530 sacks salt saturated Class G through shoe
and approx. 3901 sacks Class G with 10% gel through stage tool at about
5000 ft.
The casing will be cleaned out to the float collar but will not be perforated.
A bridge plug will be set at 2~00 'ft. and the hole displaced to diesel above 2500 ft.
(This ~pae~ for State off~e
Attorney-in-fact
DATE August 29, 1969
TITLE
DATE
See '[nstrucfions On Reverse Sid,e
AL00417
US 7-2-01-11-12
BP ALASKA INC.
P. O. BOX 4-CCC
121 WEST FiREWEED LANE. SUITE 205
ANCHORAGE. ALASKA 99503
TELEPHONE 277-1422
August 20, 1969
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
.Anchorage, Alaska 99504
Gentlemen:
BP 01-11-12
Enclosed in triplicate is. tbrm P-3, "Sundry Notices and Reports on Wells"
advising you of our intention to suspend the above well.
HW
Enclosures
Very truly yours,
BP ALASKa, ~?T~N~ ,.. ~~I~' /~'''j
//// // / ,, /,i
I-I ¢. ~J 2~ ~ar~~
O~grati~anager
~orm P~3
i%EV. 9-30-67
,,
Submdt "Intentions" in Triplicate
& "Subsequent Reports" in Duplicate
STATF OF ALASKA
AND GAs CONSERVATION ,CO,MM[TYRE
SUNDRY NOTICES AND REPORTS O,N WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a diffierent reservoir.
Use "APPLICATION FOR P~IT--" for such proposals.)
OIL ['-'1 GAS 9
WELL WELL 0T.ER Appraisal
....
2. NAJVIE OF OPERATOR
BP ALASKA INC.
3. ADDRESS OF OPERATOR
P. 0. Box 4-1395, Anchorage, Alaska 99503
4. LOCATION O,F WF_~LL
Atsur£ace 458' WEL, 1998' NSL, Sec 1, TllN, R12E, UPM
13. ELEVATIONS (Show whether DF, ET, GE, etc.
KBE 41.23' AMSL
14.
Check Appropriate Box To [nd}cate Nlature of N~oti'ce, Re
~. APZ ~mvmmc~u coo~.
API 50-029-20042
~i LF_~S~, D~r~SNAT~ON ~U~O S~L~. ~O.
ADL-28260
7. IF IN~DIA.N. ALLOTTEE OR TRIBE NA1VIE
8. UNIT~ FAR1Vi OR LEASE NAME
Put River
9. WELL NO.
BP 01-11-12
10. FIELD AND POOL, OR WILDCAT
Prudhoe Bay
11, SEC., T., R., ~., (BOT~M HO,~
O~ECTIVE)
Sec 1, TllN, R12E, UPM
12. PERlViIT NO.
69-78
:o,rt, o,r 'Other 'Data
NOTICE OF INTENTION TO:
TEsT WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
PULL OR ALTER CASINO
MULTIPLE COMPI,ETE
ABANDON*
CHANGE PLANS
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(Other) Suspend (NOTE i Report results of multiple completion on Well
_ Completion or Reeompletlon Report and Log form.)
15. DFSCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any
proposed work.
We intend to suspend our subject well pending design of production facilities and
downhole completion arrangements.
The well status will be as follows:-
T.D. in 8-1/2" open hole approx. 9400 ft.
Last casing string 7" 29 lb/ft N80 X line set at T.D.
Cemented with approx. 530 sacks salt saturated Class G through shoe
and approx. 390 sacks Class G with 10% gel through stage tool at
about 5000 ft.
The casing will be cleaned out to the float collar but will nOt be perforated.
A bridge plug will be set at 2500 ft. and the hole displaced to diesel above 2500 ft.
16. I hereby certify that .the'~oi/ts~.~/t.~ue/sJa'~,. correct
'(This .pace for Stat~o~ce
TITLE
Operations M~nager
DATE August 20, 1969
See l~nstrucfions On Reverse Sid,e
BP OIL CORPORATION
P. O. BOX 4-$395
121 WEST fIREWEED LANE, SUITE 205
ANCHORAGE. ALASKA 99503
TELEPHONE 277-1422
August 13, 1969
CONFIDENTIAL
0-00309
CONFIDENTIAL
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Gentlemen:
~,onthly Reports of Drilling and Workover Operations
Enclosed are monthly reports for the month of July 1969 on the wells listed
below:
BP 01-11-12
BP 09-11-13
BP 11-10-14
BP 24-10-14
Put River #1
BP 19-10-15
BP 31-10-16
Very truly' yours,
HW
Enclosures
BP OIL
Operations Manager
Form No. P---4
~-w. ~-~o-s~ STATE OF ALASKA
SUBMIT k~ DUPLICATE
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
5. API NLrEiERICA. L CODE
50-029-20042
6. LEASE DESIGNATION AND SERIAL NO.
ADL-28260
1. 7. IF I*DIA],,~, ALOTTEE OR TRIBE NANIE
O~L~LL [~ OAS~LL ~-~ oT-~.R Wildcat
2, NAME OF OPERATOR
BP 0IL CORPORATION
3. ADDRESS OF OPEI~%TOR
P. O. BOX 4-1395, Anchorage, Alaska
4. LOCATION O'F WELL
99503
458' WEL, 1998' NSL, Sec 1, TllN, R12E, UPM
8. LLNIT,F.~RA{ OR LEASE
PU~ River
9. WELL NO
BP 01-11-12
10. FIELD A-ND POOL. OR WILDCAT
Prudhoe Bay
n SEc.. T.. a.. X~.. (~Oan'om ~o~.~-
Sec 1, Tll~, R12E, UPM
12. PE[R/VIIT NO.
REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CE1VIENTING JOBS INCLUDING DEPTH
SET AND VOLLrMES USED, PER~ORATIONS, TESTS ~ I:UgSULTS, FISHING JOBS, JLrNK ~ HOLE A3qD SIDE-TP~ACKED HOLE
AND A_~Y OTI{ER SIGNIFICA/XIT CH_42~G~ IN HOL~ CONDITIONS.
JULY 1969
July 19 - 20
July 21 - 26
July 27 - 31
STRICTLY CONFIDENTIAL
Moved from BP 11-10-14. Set 20" conductor at 50' with 108
sacks cement. Rigged up.
Spudded at 1015 hours on July 21~ 1969. Drilled 17½" hole
to 979'. Conditioned for casing. Ran and cemented 13-3/8"
casing at 928' with 1240 sacks Permafrost cement. Nippled
up. Drilled out.
Drilled 12¼" hole to 4095'.
14. I hereby certify that and correct
NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be file(~ in duplicate
with the Division of Mines & Minerals by the 15th of the succeeding month, unless otherwise directed.
Mr. H, J. Clarke
BP Oil Corporation
P. O. Box 4-1395
Anchorage, Alaska. ,99503
KEITH H. MILLER, Governor
.99502
August 5, 1969
Re' Put River BP Ol-il-!2
BP Oil Corporation, Opertor
Dear Hro Clarke'
In reference to the subject drill-site, the following stipulations are
required to preserve and protect fish'and game resources'
I ·
Prior to the start of drilling~ a gravel pad of thickness
sufficient to prevent degradation of permafrost will be
constructed.
This pad will be diked to prevent drainage into the adjacent
Kuparuk River and to prevent flooding by this stream.
~
Access to this site will be only by an all-season gravel road
or by aircraft.
1
Prior to the beginning of drilling, a sump of sufficient size
to contain all waste fluids will be constructed. This sump
must be lined with material impervious to oil and oil products
at all seasons of the year. Prior to abandonment of the'site,
the sump must be cleaned of all oil and covered.
5~
The operator must dispose of all waste: including garbage: by
burning, with non-.co~,~bustible ma'aerial and un-burned residue
disposed of in a Imnner and in a location acceptable to the
Alaska Department of Fish and Game; i,e., in some locations
burial may be required; in others removal from the site may
be necessary.
6~
Sewage and~,,as, '-ce t,,~a'~".:'='~,,,= ...... t-ill t.,:o disposed of by laqooning~~ or tile
cess?oo,-septic 'ta'nk i'~:e'~:h'-',
' c~ st:rea~ or body of water will
haVe any sewage or v;as'~e water added to it.
~
Dent:on
The Habitat Biolo~jist's Office~ 1018 ~'~est International Airport
Road,, Anch~:¢age, Alaska 99502~ will be notified prior to closing
o7 th~s
[ J] ~,, ,/ ,, ~,:. J , ,,' ~ ,,
:.,,~:. ~'~-'.u~'~l..,:",;~ ,~ /, l~ .? ,,.~, ? :,. ~ . il. ll'l' '". .....
.... ~,,~ . , ...... ,l,~
~)IVISIO~t .OF OIL A~(~q GAS
July 30, 1969
!~.e: Put. River ~,P
~P Oil Corporation, Opera~r
Pear Sir:
,~closed is the approved application. ,fOr
~:lt curre~).t)y .bet~:~ c~nc=~ at a to~tto:=n tn Sectto~ l~ To~)shi~ 11.~,
~e ~'placeS it.
b~tl saap!es, ca~ chips, and a di~ctio~al su~ey are ~qaired,
~la~y rivers ta ,Al.~ga and their dratnag~ systems have be~ classt¢t~d
as i~porta~nt for the spa~t~'~g or ~sig~atton of ,a~)adro)~$ fish. Operatto.s
in these .a'~as are subject t~o AS 16,05.8'70 a~d ~ r~galatia.ns ~algated
operatio~ contact t~he )~[abi:at Coo.~t~a.tor's office, ~eparb~e'nt of Fish an~a
appltcabl~ re((~lati.o~s shall in.cl;ude the cal.tbre~(o, file and the
zero ~sitior)s of all lag traces, both befo~ and after the lo9
I~ th.~ ~veat .of s. uspe~sion .or aba':~do~ent, please ~o'ttfy' tht~ of?ice
a.d~qaatety t~ adva~)ce so that ~ ~ay .~)a. vea ~'ttness prese)~,t.
'V~ry truly
rector
STATE OF AL%SK~
DEPARTI'~EN"T OF NATURAL I~SOURCES
TRAaNSMiTTAL OF P~CEiUPTS
CODE DISTRIBUTION
DATE '"' '~
uu; .!.,'
1969
No.
PROM
BP Oil Corporation
P. O. Box 4-1395
Anchorage, Alaska 99503
Check No. 00653
6'i i iS
Drilling per~,qi~ filing fe~.
Put River BP Ol-ll-12
t,(%
O0
524
$5O
PREP~ BY i'!omer L. !3,,. '
DIVISION ()il an,~,': bas ~ ~
c,,9, age
0-00270
CONFIDENTIAL
BP Oil CORPORATION
P. O. BOX 4-1395
121 WEST fIREWeED LANE, SUITE 205
ANCHORAGE, ALASKA 99503
TELEPHONE 277-1422
July 29, 1969
CONFIDENTIAL
~LV .........
HWK
REL ....
State of Alaska
Department of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Gent lemen:
BP 01'11-12
We are resubmitting our application to drill the above subject well,
changing the type of well from vertically drilled to deviated.
Enclosed also are three copies of surveyor's plats showing the location
of the well.
Very truly yours,
HJC: hw
Enclosures
BP OIL COP~0RA.T~!ON
JUL '.' ,¢19t i9
D ]l¥151ON OF O]IL A~,~ GAS
Form P--I
REV, 9-30.-~
STATE OF ALASKA
SUBMIT IN TRIPI". _ATE
(Other instructions 'on
reverse side)
OIL AND GAS CONSERVATION ,COMMITTEE
APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK
~a, TYP~ O~ WORK
DRILL ~ DEEPEN J--J PLUG BACK []
b. TYP]~ OF W.LL
2. NAME OF OPERATOR
BP 0IL CORPORATION
Jill oql 'Q I
3. ADDR~ O~ OPF_,RATOR
P.O. BOX 4-1395, ANCHORAGE, ALASKA DIVJ$IO~.O_.F. pI_L_ANOGA$
4. LOCATION OF WELL ~~[~ A~ surface
~58~WEL, 1998'NSL, Sec 1, Tll~, RJ. 2E, U?M
At proposed prod. zone
618~WEL, 1998~NSL, Sec 1, TllN, R12E, UPM
13, DISTANCE IN MILES AND DIRECTION F.-~OM NEAREST TOWN OR POST OFFICE*
Approx. 100 miles N.E. of Umiat
5,
API 50-029-20042
6.LEASE DI~SIGNATION A_ND SEHXAL NO,
ADL-28260 : '" ''~5
.:i ,r:' ~. .:~'. ~' ~ f.' , .~-,. .
7. IF lIN-DIAN, A. LLO'i-i'I~ OR TI~.IBE NA~XE
8. UNIT~FARM OR LEASE NANIE
Put River
9. WELL NO.
BP 01-11~12
10. FIELD AND P()OL. OR WILDCAT
Prudhoe Bay
SEC., T.. R.. M.. ~Bozvo=
aOLE O~aECTIVE~
Sec 1, TllN, R12E, UPM
12.
14. BOND INFORMATION: State of Alaska DL-11
TYPE Bl~n~k~g =. Surety and/or No. Fadaral Inmuranae Co.' 8016-77-1 4 _am°un_t' $100:000.00
i5. DISTANCE FROM PROPOSED* ~m ! e _ ]16. NO. OF ACB~ IN LEASE 17. NO. ACRES ASSIGNED
LOCATION TO NEAHE:ST ~O ~rom eas~er~ TO ~iS WELL
PROPERTY OR LEASE LINE, ~, hounda~xr- ad~ace-~
(Also to nearest drig, unit, it any) ~ gl] a her Bp'T 2560
{~. DISTANCE FROM PROPOSED LOCA~ON* .... ~ ' ] 19. PROPOS~ D~TH 20. ROTARY OR CABLE TOOLS
TO NEAREST WELL DRILLING, COMPLETED,
OH APPLIED FOR, FT,
/P uparuk I' ,
c.13,900 SSE Mobil hillips N.K .9420' (~.V.D~) Rotary
21. ELEVATIONS (Show whether DF, RT, CR, etc.) State 26-12-12 =. A~OX. VAr~ WOrK W~LL srAn'r.
Estimated 30' a.m.s.1. (K.B.)
23. PROPOSED CASING AND CEME~NG PROGR~
SIZE OF HO~ SIZE OF C~SI~Otl. WEIGHT PER SOO? ,,aRAbS sm~ma DEP~ ~ Approx, ~':*"~'~' ...... o~ c..z.:,
26 20 94 H40 80 , 250 sacks Permafrost ..
.17-1/2 ..... 13-3/8 61 J55 900 1100 sacks Pe. rmafrost
12-1/4 ..... 9-5/8 .h7 Ng0 . A00O ..(700 .~k~ G 1st sta~e:_550 sks ~
2~d stage
· 8-1/2, 7 , ?9 ,,, war) ,,,,,,, , ,,., ,q/,flo, ,"~0"0 sks., g,, 18%, ,.'salt, ist stage;
400 sks G 10% gel, 2nd stage
GEOLOGICAL FORECAST:
Surface - 3600'
3600 -8720'
8.720 -.9370'
9370 - 9420' T.D.
REASON FOR DEVIATING:
Quaternary and Tertiary Gravels, sands and clays
Cretaceous and Jurassic Mudstones with sandstones
decreasing downwards
Triassic Sandstones, shales and limestones
Permo-Triassic Shale
To reach, prescribed target area from surface location accessible
to summer road system.
IN' ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If proposal ts to deepen or plug back, give data on present pr~lucttve zone and
proposed new productive zg~e. If pr~,posal is to drill or deepen direct 'onally, give perttnen~ data on subsurface locations and measured and
true vertical depths~ G .17 t' preventer program.
her~ycerti,y~.ay~..~--ean, gorree~-- ,,,,,,/~Z~~S~,., '. July' 29,1969 Operations Manager
24. I
.%!GNED , ,,/ ~, . DATE, TITI~
(This space--for Stat CONDITIONS OF APPROVAl,' IF ANY:
[SAMPLes *Nm CORE CnWS
[DIm~CrIONAL SUaVEY Rmuuum
~YES [] NO
PERMTr .....
APPROVED
BP 01-11-12
Dry bucket 26" hole to about 80 ft. and cement 20" conductor to surface with
Permafrost cement.
Drill 17-1/2" hole to about 900 ft. and cement 13-3/8" casing to surface with
Permafrost cement.
Drill 12-1/4" hole to about 4000 ft. and cement 9-5/8" anchor string in two
stages with Class G/fresh water slurry. During this section of the well the
hole will be deviated in a westerly direction in order that the well may be
completed at least 500' from the lease boundary.
Drill 8-1/2" hole to about 9400 ft. (T.D.) and, if required, cement 7" casing
in two stages with Class G/brine slurry.
Blowout preventer program is 3000 psi Hydril from 13-3/8" casing point and
3000 psi pipe rams, blind rams and Hydril from 9-5/8" casing point.
JUL29
II i
I II II
TIII~
I
I
I
(To N.E.COR)
(~ttom
160'
Hole
WELL [.DC,
Lat. 70° ?-0' 04.87"
Long 148°57'30,51"
Y = 5,973,081
X = 62 8,379
I00' -- J:' lOG~
- ZOOt
SCALE I": Ioo'
SCALE: 1"=I/2MILE
CERTIFICATE OF SURVEYOR
I hereby certify that I am properly registered and
licensed to practice land surveying in the State of Alaska and
that this plat represents a location survey made by me or ~,
under my supervision, and that all dimensions and other
details are correct.
Date
SURVEYOR
JUL2 19 ,
DIVI$1OIq OFOI[AND GAS
ANCtlO~LGE
BP 01-1 l
Located in
Surveyed for,
BP OIL CORP.
Surveyed by
F M. LINDSEY 8 ASSOC.
LAND 8 HYDROGRAPHIC' SURYEYO'RS
£502 West Northern Lights Boulevard Box 4-081
Anchorage Alaska
BP OiL CORPORaTiON
P. O. BOX 4-1395
121 WEST FiReWEeD LANE, SUITE 205
ANCHORAGE, ALASKA 99503
TELEPHONE 277-1422
July 18, 1969
0-00226
CONFIDENTIAL
State of Alaska
Division of Natural Resources
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention: Mr. Thomas R. Marshall, Jr.
Chief Petroleum Geologist
Gent lemen:
BP 01-11-12 .
Please find the following enclosed herewith:
1. Application for a permit to drill the above well.
2. Sketch of the locality, showing the proposed well site.
Details and surveyor's plat will be forwarded at the
earliest opportunity (reference.telephone conversation,
Messrs. H. Burrell and F. G. Larminie, July 18, 1969..)
3. A check for~$50 to cover the permit filing fee.
Very truly yours,
BP OIL~CORPORATION
Operations Manager
HJC:hw
Enclosures
Leasa& Wall
The following info~m, ation is in the bank file:
i. P-3
Date
2,
Data in Bank 'File!
2 P-7- Completion Report
Well History - ~_.~'
4~
Directional Survey
Electric Log ]31ue
6. Lithology or 5iud Log ..................... BI'aa iine ~ Sepia
Other Log
o
9~
Field Trip Report~ ',.dated
Lease
i . ' " .- . .-. CHECK LIST FOR NEW' WELL PERNITS ...... _ _~. '. . '
' . ' '~ .;'~ '-'~. "~'~-'~' ~':.-.'.¥: :~:-~:~.-?-:-
: ~ / _ ~ _ I . . . i · I ~ e I~ . ~ ..... . . -. .. . . -' :. . . . ;... r . . .
. ' C~--;-~/~;-?~j·
' ~ ~ ~.. ~ ~ "':" .... ..?.:.'.. · ~_.
~-';'-' ' Cs well located proper d~,tance"~rm'~O~~~ ]~;:~:~(? J ..... . .~ . ~ ~?r~(''-~'''re'r''':-~' _.~
, ~ ,s well located' p~oper'-diStan'~e~'f~'"~he"~--:W~i:i-'~:--~-~'-~?:?.;· "'.
~:-; .":: ,._-~.:"~.~' . .... .., ,..?~,...... .... .
.......... ...., ... -. ';;:.'.:.;;.:;: :._;.::~':~:.:.~:....~; :.:;-~:. ;:'- ; .:r-:;-'::'.;S~;(;'-~.'-~;?;~';?--:.t:-~.. '.. "...' ,' ~' ..'..-:'.' '..' .. ' ..,~ -- . -- ·
)'. 67:.~/~.'~._ Z's. Suff~c i eCL u haled i Cared' ;a c~a a~ "av a ~ 1 ab~;/? ~h:~ ~ '-o; l '~ ""'~ ~ "'~ :';'"-:~:-:-~:~'; ';': ~" '"";:'-":;~'~;:'" '".~: ;:':. - ' ~;' ',:..' t :;' '."'..-'.' .:" ..'; .' t;". "..';:: .' ':.: '-; ~: ;. ':--,. ;~ :'-.~-'..--.' ..': .. · - · -"
~: ;~;~¥~;:?~;~?~.~;;:?:~:~:..~`:~/;~.~/.~.~:?.`::`%.:~::~::~:;:~¥~;?~.;~::;??~?:~.~:::~:~ :.m:.:~. ::~.m m:m: mm.mm, mm' .mm;m:m:::;.:?'?.:.,,::m:m~?~?;.~,;.:~:m.~;,:.__.}:.:. mmm ....... 'm mmm m'~ ', ........ m :.. 'm 'm 'm. '--m.': m,m-
'; ': 9~ ;';'--"-Can Pemi t' be ap rOved 'before'-r--'~en'-'d'~ '-wAft??· ~" .:.':'.':'.';
~ ...... ?.~;-;,., -.' .,. p ...... - ~- -:-~'.". ' , · : ...'.'.. "'~...'.:;.:".'~.'".~..':;.::~:';'.~".':~":~:::;; :.":--': ", .'.',"-::: ::: . , .'." .,'.. .: : ." ;', .': ~:.:': :' ¥'~:.'.~'"...":.::.:"' ~'.:.':-~;;, ?'....:':". ;'....-,..'L-.':~-,;. · .
';"~-: ".;~F:;:~'.:': '-. ';- ..: ' '.' ~';' ":-'" - ' ":;?~;:~.~:/"':'::~--'~ . :/~'-~ ~'---:/,-;~;~ · .",..'" '..::':;' -:;~'. :-'~:..'.'.::":: ";?~.':?:~:::~';;:?~'.:'~:'~:.::~'i:;.:.::~.:~.:'L?-.,%'-;::{r::,:~.'..~ .,'..;'-~;.~;." ,;; .-.~ :...::.-'~:- ..... ,. .... .:..-. ',. ~:'-: ..... ..'.--.,, .'.'.,- _.--.:.-'-~,. ~ .:./' ....',.: '. ~'-'
~-:.-.,.-,?~.;:??:~-~/:,-~,.'.~.;-..- . ..;,;;~;:;'_,?.:.--,. ;:-'_- -'-: .. :-~_.._-__.~;:/- · . . ' :. ,.,~.::, ~::~-:',;:%'.. :::%.~(,.~..';:...~,.-.~:;::,t: ~;.~':'. ' ; '-' :':' ?'. Z: ...... ":" ': ";-:'; ..... ~:+":::':'~"~..'.;:~'":,::'~'.~¥'.,;~.?':"~:~.'~.f'::~":-',:; '.~"~ .:.;.:':' ':;.f.'-:.-.
~:.'.,' ~',:/;~;~1:]::- :---: -, ..... .... '.: ~?":.'.~::':~-/ .--":-".,:'::-~:.-' · ". '. ~":~ ~.~..~.~.~:;..[.;"?~...:;~?:~....?~..;.~..~...~:.?~.~;`..~:.~..~.....7~;.~...~ .::."::':~'.~ ...... :":', .... f':;:..,',...; :..,~, "..; ....... '.;~..,., ,,...-.. . .-:.. ::.~' '. '- ..... .
::'.:1 ':~ :'TS :.~nO.ugh' cement used .to.ci. rcu'late on. Conductor and surfac~.."'":'
~-~?i~'?~/:,~i~'~ ~ent cOve all P;~';{b:i~ P¢O'd';~:~";; h°; " ""'~:':"' ':':' :" :' ": .... '"' ':"~"'-'~;/"*'"' ..... ' ...............
:'~: ~. : :' ,.? . , -. :.:.. :,.., ... ::~ -. ..: ., :- -.. .: . ;,......, ':,...../..' '~ ..... .... ..,. ~..--..-........;... , '. .:.. '.-.: . ,-.:.. :: :...: .:,..-~. · :~,.:~,. . .. ::...:,-':':.... ....
~ ...... ~.~ .........: ....~,~; ....... ..... .......... ....~ ............. . .... ,~.. ........ .,,:.. ..... ...~,..,.~. ........ ..... .... .
;.~:_,:,._;: zons. . ~ ...., ... ~. ~..-....., '~-::-; ,.-., ..:..; .~: ..... .-- ..... · · :..: ...:.... -.: :....,...-~..,.:.::...,.:.- .~.:... ~ . ,-.~..:., ...,:.: .... -- -.
-.:. _;.,:.:._. :-:; :,?::--.~ .. ~: .:...:?;.;":.::;.:? ;~:;::t';:;::~;?.~.;::;:;:~:~:.,:. ~.':...':. ::.~:...??~.--~.'..: :.:....::. ~,:.,......-:.:...........-... ..
-:-15. ~11 surface castn9 covet all fresh wa~et zones . ........-~....., ,..--~ ..;..,.~.,........- ~.. :... ":'-:~:':~:~--:".::':?;;:.~.";"~;:~'..;'~.":.~-;~:;::';;::;-'-;:'? - ....
~-.'. , · .: .... .:: :-_- :~.~-:._t~s,:_ >-. . .: . - ..........
.-;~.]6." ~ sure,ce cs9. ~,~e~,~] bu~,~ ~q~a]'-'~;~;p~::~'/~. """ "::' '""';' '""' ~:' '-"'~ :~:: "-:' "' ' ' ' "- ""-:-' ~-" -" · ' '
~... · to nex~ s~fng .'.. '; ~.-'" : -' . .....':...:"... ;.'..".".-."- .'.":.....
. ~ · -.,....: : ...... ,,./-';.. Y~..;;-.?//%;;~/.;-: ~.¥.-~.~?:-_,;:¥;--'.::,::~::_:::-;_~-~-':':-; ¥_-.~./:. ?; -:. :;.-_ .'. _.". _ .: . _ -
" .... '" - ' '- KLV