Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-076XHVZE Image Project Well History' File Cover Page This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. glo 1- Organizing I~o,,~ [] r items: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: DIGITAL DATA ~ Diskettes, No. J [] Other, No/Type BY: BEVERLY ROBIN VINCENT SHERYL/~ARIA~WINDY / OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other Project Proofing BY: BEVERLY ROBIN VINCENT SHERYLiMARIA WINDY Scanning Preparation I x30= 30 DATE:fi/{0 3 /S/ III IIIIIIIIIII II III : TOTALPAGES .3 0 BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: (~/3/(~ ~,~ /SI Production Scanning Stage I PAGE COUNT FROM SCANNED FILE: PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: YES BY: Stage 2 IF NO IN STAGE 1 , PAGE(S) DISCREPANCIES WERE FOUND: ~ YES (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) NO NO RESCANNEDB~'] BEVERLY ROBIN VINCENT SHERYL MARIA WINDY General Notes or Comments about this file: DATE: /S/ Quality Checked 12/10/02Rev3NOTScanned.wpd • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 1 Anchorage, Alaska 99519 -6612 December 20, 2010 ost. ^; 4 ZU11, dx" Mr. Tom Maunder �o\ Alaska Oil and Gas Conservation Commission C ` to a ns . : „ O 333 West 7 Avenue pa Anchorage, Alaska 99501 Wor"40, Subject: Corrosion Inhibitor Treatments of GPB Y Pad 0176 Dear Mr. Maunder, 1 Enclosed please find multiple copies of a spreadsheet with a list of wells from Y Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 12 /20/10 Corrosion Well Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal Y-01B 2010760 50029203940200 NA 2.5 NA 8.50 4/11/2010 Y -02A 2011730 50029203950100 NA 0.1 NA 0.85 4/11/2010 Y -03A 2042350 50029204110100 NA 2.2 NA 18.70 4/16/2010 Y -04 1791050 50029204230000 NA 1 NA 5.10 4/11/2010 Y -05B 2081380 50029204360200 NA 3.3 NA 20.40 4/15/2010 Y -06A 2042510 50029204310100 NA 0.7 NA 3.40 4/16/2010 Y -07A 2071050 50029205600100 14.5 2.0 0.3 NA 1.70 8/4/2010 Y -08A 1880560 50029205720100 NA 4 NA 15.30 8/5/2010 Y -09A 1970830 50029205790100 19 1.5 3.6 NA 17.00 8/4/2010 Y -10A 2042500 50029205870100_ 19 3.0 8.75 NA 54.40 8/6/2010 Y -11C 2051640 50029205130300 NA 0.1 NA 0.90 4/14/2010 Y -13 1811120 50029206340000 NA 0.4 NA 3.40 4/15/2010 Y -14B 2011010 50029218320200 NA 3.8 NA 20.40 4/10/2010 Y -15A 2010890 50029209400100 NA 2.1 NA 11.90 4/10/2010 Y -16 1830490 50029209320000 18.8 2.0 1.7 NA 10.20 8/4/2010 Y -18 1830290 50029209160000 NA 0.8 NA 5.10 4/9/2010 Y -19 1880960 50029218570000 NA 0.2 NA 0.85 4/15/2010 Y -20A 2010250 50029215870100 NA 1.5 NA 11.90 4/14/2010 Y -21A 1950370 50029215740100 NA 0.1 NA 1.70 4/13/2010 Y -22A 1881150 50029215580100 NA 0.5 NA 3.40 8/4/2010 Y -23B 2031640 50029215900200 NA 1.2 NA 6.80 4/13/2010 Y -24 1861130 50029216080000 NA 1 NA 6.80 4/12/2010 Y -25A 2081400 50029218830100 NA 0.3 NA 1.70 4/18/2010 Y -26A 2010430 50029221910100 NA 0.3 NA 1.70 4/15/2010 Y -27 1900280 50029220190000 NA 0.5 NA 3.40 4/14/2010 Y -28 1910650 50029221690000 NA 3.5 NA 28.90 4/12/2010 Y -29A 1960910 50029221230100 NA 0.2 NA 1.70 4/13/2010 Y -30 1910150 50029221350000 NA 0.5 NA 2.60 4/13/2010 Y -31 1910560 50029221610000 NA 0.5 NA 3.40 4/12/2010 Y -32 1910410 50029221490000 NA 0.3 NA 1.70 4/18/2010 Y -33 1910300 50029221440000 NA 0.9 NA 6.80 4/12/2010 Y -34A 1990040 50029221780100 NA 0.9 NA 5.10 4/11/2010 Y -35A 2022370 50029221860100 NA 1.5 NA 10.20 4/15/2010 Y -36 1931310 50029224000000 NA 0.9 NA 5.95 4/10/2010 Y -37A 2020460 50029224030100 NA 0.8 NA 6.00 4/14/2010 ~c~dunberger Alaska Data & Consulting Services 2525 Gambell Street, Suke 400 Anchorage, AK 99503.2838 ATTN: Beth Well Job # Log Description Date BL 1-27/P-20 -01-01C 11-28A AYKP-00085 BB6M-00016 AYKP-00061 RST -- RST .~ RST 06/06/10 06/09/10 05/31/10 1 1 i 1 1 OS-25C Y-016 14-07 BCUE-00021 BAUJ-00024 BBKA•00035 MCNL MCNL RST 06/02J10 05/25/10 06/06/10 1 1 1 1 1 1 MPS-37 15-27A 15-27APB1 BCRC-00026 10AKA0067 10AKA0067 RST ~- ~ OH MWD/LWD EDR OH MWDA.WD EDIT 06/21/10 05/14/10 05/08!10 1 2 2 1 1 1 PLEASE ACKNOWI FrIRP wac cior rav ev_ua v_ wun eetr ~ouwn ...,~ ........ ....... ~,._ BP Exploration (Alaska) Inc. Petrotechnical Data Center 1R2-1 900 E. Benson Blvd. No. 5569 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 ^ ~~' O n~ Anchorage, AK 99501 ~'WY/ IL VVV ~} Color CD /~r~ ~ ,~1 ~i ~J VVV i Alaska Data 8 Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2839 oe/os/1o J u >i ~ ~ ~11~a ~ ~~~ ~,., 5:. ws _~ ~ *~ . ~ •.---~ ~_ ~ ppgq F ~9Y P-\I.li= ~ ~(1"its ~~~ STATE OF ALASKA ALASK~ AND GAS CONSERVATION COMMISSI REPORT OF SUNDRY WELL OPERATIONS RG~~~ V ~~ 1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other Performed: Alter Casing ^ Pull Tubing^ Perforate New Pool ^ Waiver^ Time xtensio n n Change Approved Program ^ Operat. Shutdown^ Perforate ~ Re-ente Susp~/61~~~~ • ~+OII'M~113Sj0 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: .Permit to Drill N AC~~B Name: Development Q Exploratory ^ 201-0760 3. Address: P.O. Box 196612 Stratigraphic^ Service ^ .API Number: Anchorage, AK 99519-6612 50-029-20394-02-00 8. Property Designation (Lease Number) : ~ 9. Well Name and NumbeC ` ADLO-028287 PBU Y-01 B 10. Field/Pool(s): PRUDHOE BAY FIELD PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 14380 feet Plugs (measured) 13400' feet true vertical 8820.89 feet Junk (measured) None feet Effective Depth measured 14318 feet Packer (measured) 11092 11124 true vertical 8833 feet (true vertical) 8048 8069 Casing Length Size MD TVD Burst Collapse Structural Conductor 110 20" SURFACE - 110 SURFACE - 110 Surface 2690 13-3/8" 72# L-80 SURFACE - 2690 SURFACE - 2690 4930 2670 Production 11778 9-5/8" 47# L-80 SURFACE - 11778 SURFACE - 8527 6870 4760 Liner 738 7" 29# L-80 11232 - 11970 8140 - 8665 8160 7020 Liner 884 4-1/2" 12.6# 13CR80 11137 - 12021 8077 - 8697 8430 7500 Liner 3251 3-3/16X2-7/8" 6.2#X6.1 11119 - 14370 8066 - 8823 8520 7660 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13CR80 SURFACE - 11148 SURFACE - 8084 3-3/16" 6.16# L-80 11143 -12093 8081 - 8728 2-7/8" 6.16# L-80 12093 - 14370 8728 - 8823 Packers and SSSV (type, measured and true vertical depth) 9-5/8"x4-1/2" TIW HBBP PKR 11092 8048 9-5/8"X4-1/2" ZXP PKR 11124 8069 12. Stimulation or cement squeeze summary: Intervals treated (measured): `~ ^~ ~`~t~-! `I ~~ ~ ~ ~ i Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 443 3055 1357 230 Subsequent to operation: 567 4077 1635 257 14. Attachments: 5. Well Class after work: Copies of Logs and Surveys Run Exploratory^ Development Q Service ^ Daily Report of Well Operations X 6. Well Status after work: Oil ~ Gas WDSPL GSTOR ^ WAG ^ GINJ ^ WINJ^ SPLUG ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: NA Contact Gary Preble Printed Name Gary Prebl Title Data Management Engineer Signature Phone 564-4944 Date 6/3/2010 Y-036 201-076 PERF ATTAC_HMFAIT • • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base Y-01 B 7/28/01 PER 13,580. 13,630. 8,918.59 8,914.19 Y-01 B 7/28/01 PER 13,661. 13,760. 8,912.58 8,904.05 Y-01 B 7/28/01 PER 13,790. 13,850. 8,901.36 8,895.24 Y-01 B 7/28/01 PER 13,980. 14,030. 8,880. 8,873.96 Y-01 B 7/28/01 PER 14,070. 14,172. 8,869.45 8,860.53 Y-01 B 7/28/01 PER 14,200. 14,300. 8,856.01 8,837.11 Y-01 B 6/9/08 PER 13,190. 13,220. 8,951.84 8,950.7 Y-01 B 6/9/08 BPS 13,400. 14,316. 8,942.11 8,833.87 Y-01 B 6/10/08 PER 13,130. 13,160. 8,953.28 8,952.72 Y-01 B 6/10/08 PER 13,160. 13,190. 8,952.72 8,951.84 Y-01B 6/11/08 PER 13,100. 13,130. 8,953.75 8,953.28 Y-01 B 5/25/10 APF 13,220. 13,250. 8,950.7 8,949.61 Y-01 B 5/26/10 APF 12,712. 12,742. 8,936.07 8,938.26 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • Y-01 B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 5/24/2010 CTU 9 w/ 1.75" CT Scope; MCNL/ Add perfs RIH w/ SLB memory MCNL inside ~2.2" carrier. *"job continued on WSR 05-25-10*" ~ 5/25/2010~CTU 9 w/ 1.75" ct, Scope; MCNL/ Add perfs "*continued from WSR 05-24-10** ' Resume RIH while keeping well fluid packed down backside. Tag CIBP @ 13429. Log two up passes from CIBP @ 60 fpm to 12000'. Flag pipe @ 13300' on second pass. pooh. Corr -23' to prior MCNL. MU 30' pert gun. RIH and perforate 13220- 13250'. POH. Standby/maintenance while wo WSL.**job in progress*" E 5/26/2010aCTU 9 w/ 1.75" CT, Job Scope, MCNL/ Add perfs '"'"continued from WSR 05-25-~ 10*'' MU Perf Run #2 and RIH w/ 2" 6 spf 60 deg phz - PJ2006 HMX guns. At flag, correct depth to bottom shot and PUH to bottom shot depth.. Launch 1/2" ball 'and fired 30' of 2" 6 spf 60 deg phz - PJ2006 HMX guns from 12.712' to 12,742' , and POOH. Freeze protect Well with 38 bbls 50/50 Meth. Confirm shots fired. B/D .guns and firing head.Recovered 1/2" ball from firing head. RDMO "***" Job Complete ***** FLUIDS PUMPED BBLS 260 1 % XS KCL W/.6% SAFELUBE 196 1 % XSKCL 88 50/50 METH 544 Total TREE= ~6-3/8" McEVOY WELLHEAD= MCEVOY ACTUATOR = OTIS KB. ELEV = 81.37' BF. ELEV = KOP = 50.69' 3200' Max Angle = 102' C 14261' Datum MD = 12651' Datum TV D = 8800' SS SAFETY S: 4-1/2" CHROME TBG. WELL > 70 DEG @ 12500' > 90 DEG @ 13037'. I Y-~ 1 B 19-518" DV COLLAR 13-3/8" CSG, 72#, L-80 BTRS, ID = 12.347" Minimum ID = 2.372" @ 12093" TOP 4F 2-7J8" LNR 2141' IJ4-1/2" HES HXO SSSV NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PO DATE 6 3075 3074 8 MMG DOME RK 16 07!16!08 5 5610 4910 58 MMG DMY RK 0 07/16108 4 7929 6170 54 MMG DOME RK 16 07/16/08 3 9419 7076 52 MMG DMY RK 0 06/02/01 2 10511 7724 57 MMG DMY RK 0 06/02!01 1 10972 7974 53 MMG SO RK 24 07/16!08 110$2' I-14-1/2" HES X NIP, ID = 3.813" 11092' I-19-5/8" x 4-1 /2" TNV HBBP PKR, ID = 3.949" ~3-3/4" BKR LNR DEPLOY SLV, ID = 3.00" 9-5/8" X 4-1/2" BKR ZXP PKR ID = 6.313" 9-5t8" X 4-1/2" BKR LNR HGR, ID = 6.250" 112" TBG, 12.6#, 13CR, .0152 bpf, ID = 3.958" 7" BOT LNR HGR 9-518" CSG, 47#, L-80 BTRS, ID = 8.681" WHIPSTOCK RA TAG BKR~30/01 PERFORATION SUMMARY REF LOG: SWS -MEMORY CNL/GR 7/27!01 ANGLE AT TOP PERF: 91 ° @ 13100' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSgz DATE 2" 6 13100 - 13130 O 06/10/08 2" 6 13130 - 13160 O 06/10/08 2" 6 13160 - 13190 O 06/10/08 2" 6 13190 - 13220 O 09/01/01 2" 4 13580 - 13630 C 07/28/01 2" 4 13660 - 13760 C 07/28/01 2" 4 13790 - 13850 C 07/28(01 2" 4 13980 - 14030 C 07/28/01 2" 4 14070 - 14170 C 07/28(01 2" 4 14200 - 14300 C 07/28/01 4-112" LNR, 12.6#, 13-CR .0152 bpf, ID = 3.958" 4-1i2" HES X NIP, ID = 3.813" 11137' -{4-1/2" HES XN NIP, MILLED OUT ID = 3.80" 11143' 3-1/2" X 3-3/16" LNR XO, ID = 2.80" 11150' 4-112" WLEG, ID = 3.958" 7" MIILOUT WINDOW {Y-01 A} 11970 4-1/2" MILLOUT WINDOW {Y-01 B) 12021' - 12027' I PBTD 1 3-3/16" X 2-7/8" LNR XO, ID = 2.372" 13400' 2.20" WOT CIBP (06/09/08 2-7/8" LNR, 6.16#, L-80, STL, .0058 bpf, ID = 2.372" DATE REV BY COMMENTS DATE REV BY COMMENTS 09/09/80 ORIGINAL COMPLETION 07/19/08 SWGSV GLV GO (07116!08) 01/22/97 JLM SIDETRACKCOMPLETION 07/13/01 CAO/KA CIBP& WHIPSTOCK 07/28/01 CH/KAK CTDSIDETRACK 07/02!08 WRR/PJC PERF/SET CIBP (06/09!08) 07/03108 PJC GLV TVD CORRECTIONS PRUDHOE BAY UNff WELL: Y-01 B PERMfT No: 2010760 API No: 50-029-20394-02 SEC. 34, T11 N, R13E, 1205' FNL & 764' FWL BP Exploration (Alaska) Maunder, Thomas E (DOA • From: Preble, Gary 6 (SA{C) (Gary.PrebleQbp.com] Sent: Thursday, June 19, 2008 8:16 AM To: Maunder, Thomas E (DOA) Subject: Emailing: Y-016-PERF-ATTACH.PDF Attachments: Y-01B-PERF-ATTACH.PDF `1 ~~ '~ ~~NE® JUN ~. ~ 2008 Y-O16-PERF-ATTAC H.PDF (44 KB) Tom, Sorry about that. Also could you pencil in the correct well name. I listed it as Y-OlA on the 10-404 and it should be Y-01B. Thanks The message is ready to be sent with the following file or link attachments: Y-OlB-PERF-ATTACH.PDF Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled. «Y-OIB-PERF-ATTACH.PDF» 1 Page 1 of 1 • • Maunder, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Wednesday, June 18, 2008 4:08 PM To: Gary Preble (SAIC) Subject: Y-01 B (201-076) Gary, I am reviewing the 404 for the recent perforating work. It appears that a BP was set at 13400 on 6/9 that isolated the existing perfs in the welt. The "shot sheet" you provided does not have any entry for this. Tom Maunder, PE AOGCC 6/18/2008 • ~~-~c,~ ' STATE OF ALASKA`~~~ :IUP~ ALA OIL AND GAS CONSERVATION COMM~JN ~ ~ ~~~~~' REPORT OF SUNDRY WELL OPERATIONSA~a§ka~+~& G~ ~`~~ ,,~,~,_ 1. Operations Abandon ~ R~ir Well Plug Perforations ~ Stimulated Other;,,?,- k~at Performed: Alter Casing ~ IQI Tubing Perforate New Pool ~ Waiver ~ Time Extension Change Approved Program ~ Operat~utdown Perforate Q Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Y Exploratory 2o1-o7so 3. Address: P.O. Box 196612 Stratigraphic ' Service 6. API Number: Anchorage, AK 99519-6612 50-029-20394-02-00 7. KB Elevation (ft): 9. Well Name and Number: 75.02 KB' PBU Y-01~ 8. Property Designation: 10. Field/Pool(s): ADLO-028287' PRUDHOE BAY Field/ PRUDHOE OIL Pool 11. Present Well Condition Summary: ~ 1 ~~_ Total Depth measured 14380 ' feet Plugs (measured) ..~'°"~ ~r'Q~ `~~r,7~, true vertical 8820.89 ~ feet Junk (measured) None 9 ~~W ~/'rJ~ ~~I~ Effective Depth measured 14318 feet true vertical 8833 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 110' 20"X30" SURFACE - 110' SURFACE - 110' SURFACE 2690' 13-3/8" 72# L-80 SURFACE - 2690' SURFACE - 2690' 4930 2670 PRODUCTION 11778' 9-5/8" 47# L-80 SURFACE - 11778' SURFACE - 8527' 6870 4760 LINER 738' 7" 29# L-80 11232' - 11970' 8140' - 8665' 8160 7020 LINER 884' 4-1/2" 12.6# 13CR80 11137' - 12021' 8077' - 8697' 8430 7500 LINER 3251' 3-3/16'X2-7/8" 6.2#X6.16# L-80 11119' - 14370' 8066' - 8823' 8520 7660 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13CR80 SURFACE - 11148' 3-3/16" 6.16# L80 11143' - 12093' 2-7/8" 6.16# L-80 12093' - 14370' Packers and SSSV (type and measured depth) 9-5/8"X4-1/2" TIW HBBP PKR 11092' 9-5/8"X4-1/2" ZXP PKR 11124' 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 432 25756 245 894 Subsequent to operation: 467 28479 254 469 14. Attachments: 15. Well Class after proposed work' Copies of Logs and Surveys Run Exploratory Development ~ Service Daily Report of Well Operations X 16. Well Status after proposed work: 0iI Gas WAG GINJ ~' WINJ ~' WDSPL ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature Phone 564-4944 Date 6/17/2008 Form 10-404 Revised 04/2006 ~1t~,-~~ ~ R ~ G ~ ~ A L ~ ~ J~~ ~ ~ ~oo~ Submit Original Only • • ~1 M ~~ m m r,,, O ~i } r" O N ~_ of v~, ao , u~ d%~jt~iM p~pp=tiy;w 'piw;wjp z>wa~!a~ F--(oa~ao;co Z t 3 dmj a I i t; ~ ! ! ~ ~ gyp; r-~~i~~~IC~i00! 1 ~ i ~ INw r" i ~CwO,N~ I i '% ipi ` IO'Q. I~jM~A(N~riMi ;w; ~ iJ;O wM~w~y; MM~y~ t~~tflw'~tflw lt~fw?4t1~?{ I 1 t W~NMt?wV~• wVn,IwYn~: w~nj i ff ! ?OI ~ i i~1 COi W 1 W~W i W~ W! 1 3 i 1 p i ~ U %U I U 1 I ! i ! ~~IN:--' aia ! i ~ 1 I f I Ji010}~ iw?w o~a`to,!c°pv!nin ~ i~(wQ-lj~-!w?Wi~i~ tOiN;wjMiCVi(~? ~u•.lw;~;pl©jwillJ~a~a N~~"~!Mi~iMi sa i1.'(a=2lZi~i~i~~1r ao.w3c~Im~a~ic?~ iw~w~J~a;aIC1~Q~t-I~- o01C0,o0 (.oDlooio0 .bi~.Ufifn;{A!NtUI;il3!Vl ~iCS;C7~0iNjCftC~C~CIC(Oj f ' ! ~!iOsl!liMkl~jOlt-!N;~OiCA~M! j I Jaj1~~00{Q!r~MiMiNfwlr~rj !LrilL! {~lfn~LL ~!rir~!a'~rier"i~fjri;ri;ri•ri Iw}~;-~;a.io.;C'! r,w;r-,r;w;w:w,~-fw;w~w; jO.I~?Nj~IN;N i!{ i~! t } ! ! wiGiC:OiOiO Q ©i0' pp% Q~O i i i ~ J ± j 1~ i 1O' ~ F : i ' Ni00i~0 Q!`COtI`IOlO=M%Mt(fli0i ~a,u~cfl~i.l~?o N,'d'ww(t-'le-; ~ ` i i i j f ; i ; ~ i ' i ?W !oc i ' tM;MIMIMId'j~l~M M!MlM;ME `w' _ __ ~; :wiwiwaw~ ir-~t-~w%w;rF _.f_..--i...._.._... ~ ~ ~ s.. ..f. "p!p{ ., _ . • % f ~ f i i ~i ~. ~ i 7 % r Wi f ~ r 3 O' i i i ! ~ Cal i ~ ! ! i { ~ { Uji{1lF 'N p i~. jOOW ~ld;~A:J 1 ! ! ~ ! F ~ = (} ,O d Z~ J,J!J, Ivlv,vw j ( i j ~ ~~ ! ! ~ RL~`a s ~ fai 'w'i Qjut!wlwJ '€z~zlz~o a;x a a i i 'C ~'~~l~~~i~!U'LL.~Wjl1.!LL ~ ~ ~ l l a ©I~C~JiJ U CaiCa~tsl ~ l ~ w!ww~w ua:wla!n.~a•n.~ai a~ a.{aiasala~a:alm~a a~a'a! wlw n. plor%mfJ.Jlw m a~a!mlm~~!u.~~ ~?~'o . ~ , - , W ! R% i r ? ; ! ~ ; ; ; F i ; O i i ! ~ j ~ I i ! S ! ~ ! 3 j f w!r;wzt°•iw!wj t iM:M~e , ( ! ~ Oip~p~CS p'O CpiOpi0i0:01 ~ ~ ! ! i i ~fOC!CDiODI~iODjti.i~jC[O,r-~ ~ iCL•~Lj~iO! 4~'I(J}i c-vi~viN;~,~ Na~;v~;*'Icalc3t 'a~almlm!u.u.~;~!~ r~,r.,r~;r,nlr,;~a;w~c~; • • Y-O1B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE _~ SUMMARY 6/8/2008;. Well shut in on arrival. Broadcasting=yes. Job scope. Drift/mem log GR/CCL for depth control/Set CIBP/Perforate. MU/RIH w/ SWS mem GR/CCL in carrier '. w/ 2.25" JSN. Taa TD @ 14350' (ctm-uo). Log tie-in strip to 12650' w/ a flag @ 13350'. POOH. Continued on 06/09/08 WSR. 6/9/2008'Continued from 06/08/08 WSR. Broadcasting=yes. POOH from tie-in log. `':Freeze protect wellbore to 2500'. Reference log SLB MCNL dated 7-27-2001 "Depth shift is -41'. MU/RIH w/ WOT 2 7/8" CIBP. Set CIBP @ 13400' and ;corrected, mid point of sealing element. MU/RIH w/Gun #1 - 30' of 2". Depth ;',correct to bottom shot @CIBP. Shoot interval 13190'-13220'. POOH. Cut ';100' of CT. Continued on 06/10/08 WSR. 6/10/2008:Continued from 06/09/08 WSR. MU/RIH w/Gun #2 - 30' of 2". Tag CIBP. :'Reset counter to bottom shot. Shoot interval 13160'-13190'. POOH. ALL ''SHOTS FIRED. MU/RIH w/Gun #3 - 2" x 30' 6 spf PJ2006 HMX EHD=0.23" - TTP=19". Tag CIBP. Reset counter to bottom shot. Shoot interval 13130'- At surface with Gun #3`- ALL SHOTS FIRED. MU/RIH w /Gun #4 - 2 x 30' 6spf. Tag CIBP. Reset counter to bottom shot. Continued on 06/11/08 WSR. 6/11/2008 Continued from 06/10/08 WSR. Broadcasting =yes. Fire Gun #4, shootina interval 13100'-13130'. POOH, freeze protect backside to 2000' w/ water/meth. !;All shots fired. Rig down. "*'`*" Job Complete'`** Well is ready to POP. FLUIDS PUMPED BBLS 30 METH/WATER 7 1 % KCL W/0.6% SAFELUBE 37 Total Y-01 B 201-0760 PFRF ~TT~C_HMFNT Oper 'on Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base 7/28/01 PER 13,580. 13,630. 8,918.59 8,914.19 7/28/01 PER 13,661. 13,760. 8,912.58 8,904.05 7/28/01 R 13,790. 13,850. _ $ 901.3°~ 8,895.24 7/28/01 P 13,980. 14,030. "8,880. 8,873.96 7/28/01 PER 14,070. 14,172. 8,869.45 _ 8,860.53 7/28/01 PER 14,200. 14,300. 8,856.01 8,837.11 6/9/08 APF 13,190. 13,220. 8,951.84 8,950.7 6/10/08 APF 13,130. 13,160. 8,953.28 8,952.72 6/10/08 APF 60. 13,190 8,952.72 8,951.84 6/11/08 APF 13,1 13,130. 8,953.75 8,953.28 AB ABANDONED PER PERF APF ADD PERF F REPERF BPP BRIDGE PLUG PULLE D SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED S UEEZE MIS MECHANICAL ISOLATED ST DLE PACK, CLOSED MLK MECHANICAL LEAK T STRAD PACK, OPEN OH OPEN HOLE `~° ~ ~!,~ ,< ~` ~~ ~~~ ~~~0 ~1 J e Job# Loa Description Date BL o or H·34 11477963 LDURST 11/07/06 1 y.o18 11485468 MPPROF W/DEFT & GHOST 11/07/06 1 2-08/K·16 11487771 LDL 11/12/06 1 X·03A 11485772 MPPROF W/DEFT & GHOST 11/09/06 1 DS 09-51 11477933 INJECTION PROFILE 11/06/06 1 15-45A 11485469 MPPROF & INJECTION PROF 11/09/06 1 N-07A 11296715 PROD PROFILE W/GHOST 09/10/06 1 DS 09-31C 11483591 INJECTION PROFILE 11/20/06 1 G·06A 11422979 SCMT 11/01/06 1 P2·59A 11414775 SCMT 11/05/06 1 NGI-06 11414773 USIT 11/01/06 1 A-43 11414774 US IT 11/03/06 1 01·26A 11001225 RST·SIGMA OS/24/05 1 1 Sc~tumbel'ger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth 80 l - 0-=[(0 WI! 11/28/06 NO. 4058 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay CI CD . . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services "" G,m'" S"". So" E A","'mg.. AK """Y¿ ATTN: Beth ê Received by: I / f\--- Date Delivered: NO\! '1. 9 7nOG \~ e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFìche\CvrPgs _ Insens\Mìcrofihn _ Marker.doc Permit to Drill 2010760 DATA SUBMITTAL COMPLIANCE REPORT 7/3012003 Well Name/No. PRUDHOE BAY UNIT Y-01B Operator BP EXPLORATION (ALASKA)INC MD 14380 TVD 8821 Completion Dat 7/28/2001 P" Completion Statu 1-OIL Current Status 1-OIL APl No. 50-029-20394-02-00 UIC N REQUIRED INFORMATION Mud Log N_9o Sample N_9o Directional Survey N._~o DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt (data taken from Logs Portion of Master Well Data Maint) Interval Log Log Run OH / Dataset Name Scale Media No Start Stop CH Received Number Comments 11808 14314 Case 8/21/2001 10287 11808-14314 Directional Survey FINAL ch 9/7/2001 Directional survey Digital Data Directional Survey FINAL ch 9/7/2001 Directional Survey .~,,erff~ensated Neutorn 2 FINAL 11808 14314 CH 8/21/2001 11808-14314 BL, Sepia Log 10287 FINAL 11808 14314 CH 8/21/2001 10287 11808-14314 digital data Well Cores/Samples Information: Name Interval Dataset Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y Chips Received? '~-d~.! -~" Analysis R ~.n~.iv~.d ? :~ O m:--~--~ i i a n-----:--:~:~ ::::::::::::::::::::::::::::::::::::::::::: Daily History Received? ~ N Formation Tops ~ N Date: Transmittal Form BAKER HUGHES Baker Atlas Canada GEOSciences Centre To: State of Alaska, Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Attention: Lisa Weepie Reference · BP Amoco Y-01B Prudhoe Bay Unit Contains the following: 1 - LAS Format disk:' 3 - Films 1 - Measured Depth MWD GR Print 1 -Ultra-Slim Multi Propagation Resistivity GR Print 1 - TVD-USMPR-GR Print Sent By: JosefBerg Received By.,:~~~r~j /..~ Date: Mar 20, 2002 Date: RECEI- ED ................ . i, ~! .? :_~ ........ &J2.: ........... %_2.......2....52.. ~.,., - ~ ~:.._i~._.~. ' I ".??'i ..... · '.'. "y'ww .......... ............. . .. .Z.~.52 _Z:_=:_..:...:.-.. .......... · ':'" :::5' .... :.:r..=;::. ............ ._' ................... ................. ~_~ . ~'.2'. 2:,?: .... ';;.;; .... .7.2. .. ....... .... }:,; ............ . ...~. ... ,-' . ';. .. '. :'.:;. . . 2;.:'...... ....... . . '' · -.i.. ' . . 5' ; ' " ' '¥ .......... ': ' ') ' .'"" .. "r .'Z':'.' . . ; . . .'% · ~' 2:A';"" ~:¥':.z :'~.::"':'" ~.__.; ...... ~.:z_.~ ' ~"5: ...... ~ ..... PLEASE ACKNOWLEDGE RECEIPT BY SIGNING &..R~TI2_ .RNJNG :!'"'"; ' FAX: (403) 537-3767 Baker Atlas # 1300, 401-9th Ave. S.W. Calgary, Albert a, Canada T2P 3C5 Direct: (403) 537-3752 FAX: (403) 537-3767 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service [] TSUSP 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 201-076 ,3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-20394-02 4. Location of well at surface ., :.LOCATI(:N,~ 9. Unit or Lease Name 1205' SNL, 4516' WEL, SEC. 34, T11 N, R13E, UM "... ' ¥~;11il) Prudhoe Bay Unit At top of productive interval " 5152' NSL, 2376' WEL, SEC. 27, T11N, R13E, UM. At total depth .__ 3578' NSL, 2162' WEL, SEC. 27, T11 N, R13E, UM.-'_ i r' Y-01B ,, ,.., , 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE - 75.02' ADL 028287 12. Date Spudded7/11/2001 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'7/23/2001 7/28/2001 I15' Water depth' if OffshOreN/A MSLI116' N°' °f C°mpleti°nSone 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 120. Depth where SSSV set1 21. Thickness of Permafrost 14380 8821 F~-I 14318 8833 ETI []Yes [] NoI (Nipple) 2141' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, CNL, CCI_ 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" X 30" INSUL COND Surface 110' 36" 8 cu yds Arctic Set Concrete 13-3/8" 72# L-80 Surface 2690' 17-1/2" 5004 cu ft Permafrost 9-5/8" 47# L-80 Surface 11778' 12-1/4" 1714 cu ft 'G'r 130 cuft Permafrost 7" 29# L-80 11232' 11970' 8-1/2" 531 cu ft Class 'G' 4-1/2" 12.6# 13Cr-80 11137' 12021' 6" .~25 cu ft class 'G' 3-3/16" x 2'7/8" 6.2# x 6.16# L-80 11119' 14370' 3-3/4" 168 cuft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) s~ZE DEPTH SET (MD) PACKER SET (MD) 2" Gun Diameter, 4 SPF 4-1/2", 12.6#, 13Cr-80 11150' 11092' MD TVD MD TVD 13580' - 13630' 8919' - 8914' 13661' - 13760' 8913' - 8904' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 13790'- 13850' 8901' - 8895' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13980' - 14030' 8880' - 8874' 2000' Freeze Protect with MeOH / Water 14070' - 14173' 8869' - 8860' 14200' - 14300' 8856' - 8837' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) August 5, 2001 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS'MCF WATER'BBL CHOKE SIZE I GAS'OIL RATIO 8/22/2001 4 ;TEST PERIOD 2563 24569 0 68.87I 9588 Flow Tubing Casing Pressure CALCULATED OIL'BBL GAS'MCF WATER'BBL OIL GRAWTY'API (CORR) Press. 24-HouR RATE 25.5 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit eom ¢~SE C E t VED AUG S 2001 Alaska Oil & Gas Cons. Commission Anchorage Form 10-407 Rev. 07-01-80 0 R. 1 © I i',,.1A L .... Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Top of Sadlerochit (from Y-01A) 11967' 8665' T45P 12053' 8712' T44P 12143' 8747' T42P 12213' 8777' T42P 12272' 8808' BCGL / TZ2C 12565' 8917' Zone 4 (fault contact) 13479' 8932' T45 P 13562' 8920' T45N / Base 46P 13578' 8919' Alaska Oil ~ Gas Cons dnChoroge' al. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble.~/.~~~l~ Title TechnicalAssistant Date Y-01B 201-076 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Permit No./Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 BP EXPLORATION Page 1 of 9 Operations Summary Report Legal Well Name: Y-01 Common Well Name: Y-01B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/8/2001 08:00 - 12:00 4.00 MOB P PRE PJSM. General rig down & preparations to move rig to Y-01A. Cranes to be used for exception move. R/D floor. Cut coil. R/B injector. Cross chain reel. Lay over coil tower [adjusting hydraulics w/throttle}. Lower down scissor [raise all coil jacks]. 12:00 - 14:00 2.00 MOB P PRE PJSM. Lay over catwalk. Scope-in tower and lay over derrick. : 14:00 - 16:30 2.50 MOB P PRE R/D & move pits, pumps, gert sets # 1 & 2, boilers & sub from Y-15A to Y-01A. 116:30 - 18:00 1.50 RIGU P PRE Work on & level new well cellar. Lay herculite & mats for sub. 18:00 - 20:00 2.00 RIGU P PRE Spot sub. Remove gooseneck. Lay matts & spot slingshot trailer. Work on berms. 20:00 - 22:00 2.00 RIGU P PRE Sling & spot coil trailer w/crane. Spot tool trailer, generator sets & pits. 22:00 - 23:00 1.00 RIGU P PRE Spot pool generator shed w/crane. Spot electrical shop & catwalk. Begin plugging-in & hooking-up hydraulic lines. 23:00 - 00:00 1.00 RIGU P PRE Lay herculite, matts & spot mud pumps w/crane. Back-in boiler shed. M/U mud lines. 7/9/2001 00:00 - 02:00 2.00 RIGU P PRE Spot oonex, MWD trailer, lay herculite, make up mudlines, spot camp & plug in. 02:00 - 06:00 4.00 RIGU P PRE Raise derrick, beaverslide & coil trailer, PJSMs prior to each · operation w/emphasis on awareness & communication, body positioning & line of sight when operating winch. 06:00 - 09:00 3.00 RIGU P PRE Finish module & R/U berms. PJSM. Raise coil tower & P-JU floor. 09:00 - 12:00 3.00 BOPSUF P DECOMP RIG ACCEPTED @ 09:00 HRS on 7/9/01. PJSM. N/U BOPE. Function test BOPE. 12:00 - 14:30 2.50 BOPSUI; P DECOMP Replace inside kill valve. 14:30 - 16:00 1.50 BOPSUI; P DECOMP R/U & test DSM lubricator. Pull BPV & install 2WCV. PJD DSM lubricator. 16:00 - 23:00 7.00 BOPSUF P DECOMP Pressure tested BOPE as per AOGCC regulations. Witnessing of test waived by State Rep Jeff Jones. 23:00 - 00:00 1.00 BOPSUF P DECOMP R/U DSM lubricator. Pull 2WCV. Monitor well for 10 rains - Well static. PJD lubricator. Install snubbing table & riser. 7/10/2001 00:00 - 00:30 0.50 BOPSUF P DECOMP Pressure test MV to 3500 psi, OK. 00:30 - 03:00 2.50 BOPSUI; P DECOMP Cut coil & weld on to stub, roll thru chains on injector, weld on coil connector. (30' of coil cut off) 03:00 - 04:00 1.00 STWHIP P WEXlT Circulate coil to KCL. 04:00 - 05:00 1.00 STWHIP P WEXlT Pressure test & pull test coil conector, OK. 05:00 - 06:00 1.00 STWHIP P WEXlT Pre Spud meeting w/nite crew. 06:00 - 07:00 1.00 STWHIP P WEXlT M/U window milling BHA & M/U to coil. 07:00 - 11:00 4.00 STWHIP P WEXlT Run in hole displacing fluid in well to tiger tank. Correct @ EOP flag, subtract 10' correction. Tag @ 12,027', (uncorrected to gamma). 11:00 - 11:45 0.75 STWHIP P WEXlT Displace well to biozan. 11:45 - 19:45 8.00 STWHIP P WEXlT Commence milling window w/bio out @ the bit. Mill as per procedure, thru @ 12,033' & drill formation to 12,043'. Sand back in sample. 19:45 - 21:00 1.25 STWHIP P WEXlT Ream & backream window, pump 30 bbl 2 ppb biozan sweep. 21:00 - 00:00 3.00 STWHIP P WEXlT Pump new FIo Pro to bit & POOH displacing hole to FIo Pro. Flag EOP 611,500'. 7/11/2001 00:00 - 00:45 0.75 STWHIP P WEXIT LID window millig BHA. 00:45 - 02:00 1.25 DRILL P PROD1 M/U build section BHA, M09, 2.25 deg BHI motor & Weatherford orienter. Surface test orienter, OK. 02:00 - 05:00 3.00 DRILL P PROD1 RIH w/driling BHA, shallow hole test, OK. Subtract 51' @ EOP Printed: 7/30/2001 4:00:59 PM BP EXPLORATION Page 2 of 9 Operations Summary Report Legal Well Name: Y-01 Common Well Name: Y-01B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/11/2001 02:00 - 05:00 3.00 DRILL P PROD1 flag. 05:00 - 06:15 1.25 DRILL P PROD1 Log tie in, subtract 4' correction. 06:15 - 07:15 1.00 DRILL P PROD1 Orient tfto 70R. 07:15 - 08:15 1.00 DRILL P PROD1 Drill ahead fl 12,037' to 12,117'. ROP 80, 2K WOB. 3200 psi freespin 300 psi dp on motor. 43K up, 27K dh. 08:15 - 08:30 0.25 DRILL P PROD1 Orient TF to 120R. 08:30 - 10:00 1.50 DRILL P PROD1 Drill ahead to 12,227', TF 100 R. 10:00 - 12:00 2.00 DRILL P PROD1 Orient TF to 70R, no clicks, pull into casing & orient. TF walked, reorient. 12:00 - 14:15 2.25 DRILL N DFAL PROD1 MWD not syncing up, unable to get signal ..... very weak pulses. 14:15 - 18:15 4.00 DRILL N DFAL PROD1 POOH, flag EOP, monitor well @ 500', well stable. 18:15 - 19:45 1.50 DRILL N DFAL PROD1 CIO MWD, orienter. Solenoid Drive Module failed in MWD. 19:45 - 22:30 2.75 DRILL N DFAL PROD1 RIH, shallow hole test, OK. Subtract 64' @ EOP flag. 22:30 - 23:30 1.00 DRILL . N DFAL PROD1 Attempt ot log tie in w/gamma. Gamma failed in MWD. 23:30 - 00:00 0.50 DRILL N DFAL PROD1 POOH f/MWD/Gamma. 7/12/2001 00:00 - 02:15 2.25 DRILL N DFAL PROD1 Continue to POOH f/gamma failure. 02:15- 03:00 0.75 DRILL N DFAL PROD1 CIO gamma probe. 03:00 - 05:30 2.50 DRILL N DFAL PROD1 RIH, shallow hole test, OK. Tie into EOP flag, subtract 35' correction. 05:30 - 06:15 0.75 DRILL P PROD1 Log tie in w/gamma, add 7' correction. 06:15 - 07:15 1.00 DRILL P PROD1 RIH & get flow off surveys @ 12,183' & 12,220'. 07:15 - 07:30 0.25 DRILL P PROD1 Drill ahead fl 12,227'-12,232', TF 60-80R, ROP 15 fph. 3500 off, 3800 on @ 2.5 bpm. 07:30 - 09:15 1.75 DRILL P PROD1 Orient around to 60R, TF flopping, walk it around. 09:15 - 10:45 1.50 DRILL P PROD1 Drill ahead to 12,320', ROP picking up to 70 fph, TF 30-60R. H2S drill w/drilling. 10:45 - 11:00 0.25 DRILL P PROD1 100' wiper trip. 11:00- 11:30 0.50 DRILL P PROD1 Flow offsurveys @ 12,315', 12,285', & 12,255'. 11:30 - 14:15 2.75 DRILL P PROD1 POOH f/1 degree motor, monitor well @ 500', well stable. 14:15 - 15:00 0.75 DRILL P PROD1 OOH, P/U 1 degree motor & cio MHA & bleed sub insert. 15:00 - 17:15 2.25 DRILL P PROD1 RIH, shallow hole test, OK. Tie into EOP flag, subtract 17' 'correction. 17:15 - 18:30 1.25 DRILL N :DFAL PROD1 Attempt to tie in w/gamma, gamma failed on MWD. 18:30 - 19:00 0.50 DRILL P PROD1 Continue in hole, tag @ 12,318', orient to 70R. 19:00 - 20:00 1.00 DRILL P PROD1 Drill ahead f/12,318'-12,351'. ROP 70 fph. Into zone 3 (~ 12,350'. 20:00 - 20:10 0.17 DRILL P PROD1 1 click. 20:10 - 21:30 1.33 DRILL P PROD1 Drill ahead f/12,351'-12,423'. Inclination dropping @ 80-90R. Hit 1st fault @ 12,370', no losses. 21:30 - 22:10 0.67 DRILL P PROD1 Orient around to 30-50R. 22:10 - 23:45 1.58 DRILL P PROD1 Drill ahead to 12,450', ROP slowing to 20 fph, frequent stalling, rubber from motor showing over shaker. Chert/quartz, 50~50. 23:45 - 00:00 0.25 DRILL P PROD1 POOH f/motor, MWD & bit. 7/13/2001 00:00 - 03:15 3.25 DRILL P PROD1 Continue to POOH f/tri cone bit. Flag EOP @ 11,500' & monitor well @ 500', OK. 03:15 - 04:00 0.75 DRILL P PROD1 CIO BHA, M/U 1.1 deg motor & rock bit. M09 trashed, OD 3.52". 04:00 - 05:00 1.00 DRILL N RREP PROD1 Replace flow control valve on hydraulic unit, replacement valve faulty causing seal to go out on secondary hydraulic cooler, isolate same f/system. 05:00 - 07:30 2.50 DRILL P PROD1 RIH, shallow hole test, OK, tie into EOP flag, subtract 27' correction. 07:30 - 08:15 0.75 DRILL !P PROD1 Tie in w/gamma, add 5' correction. ., Printed: 7/30/2001 4:00:59 PM BP EXPLORATION Page 3 of 9 Operations Summary Report Legal Well Name: Y-01 Common Well Name: Y-01B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 I Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/13/2001 08:15 - 09:30 1.25 DRILL P PROD1 Tag @ 12,312', ream/wash to bottom. 09:30 - 09:50 0.33 DRILL P PROD1 Orient to 30R. 09:50 - 13:00 3.17 DRILL P PROD1 Drill ahead f/12,450'-12,520' (zone 3) @ 40-50R, ROP 20-35 :fph, 2K WOB, 3200 FS/3450 on bottom. ROP decreasing to 15 fph. 113:00 - 14:00 1.00 DRILL P PROD1 100' wiper & flow off surveys @ 12,515', 12,482', 12,450' & 12,420'. 14:00 - 17:00 3.00 DRILL P PROD1 ~POOH f/b t. Flag EOP @ 11,500' & monitor @ 500', OK. 17:00 - 17:30 0.50 DRILL P PROD1 OOH, L/D bit (undergauge), & P/U used DS49 on 1.1 deg motor. 17:30 - 20:00 2.50 DRILL P PROD1 RIH, shallow hole test, OK. Correct @ EOP flag., subtract 37'. 20:00 - 21:00 1.00 DRILL P PROD1 Log tie in, add 3' correction. 21:00 - 21:30 0.50 DRILL P PROD1 Continue in, tag @ 12,520'. 21:30 - 23:30 2.00 DRILL P PROD1 Orient around to 30L, toolface consistently flopping to right side, give up on 30L & settle fl 100L 23:30 - 23:45 0.25 DRILL P PROD1 Drill @ 100-110L for 3' to 12,522'. 23:45 - 00:00 0.25 DRILL P PROD1 Get a click. 7/14/2001 00:00 - 00:15 0.25 DRILL P PROD1 Drill ahead f/3' @ 80L. 00:15 - 00:30 0.25 DRILL P PROD1 2 clicks to 30L. 00:30 - 02:00 1.50 DRILL P PROD1 Drill ahead to 12,555', TF 30L. 3000 psi freespin, 250 dp on motor. 38K up wt, 25K dh, 2-3K WOB, 25-35 fph ROP. 02:00 - 02:40 0.67 DRILL P PROD1 TF flopped, reorient to 30L. 02:40 - 05:00 2.33 DRILL P PROD1 Drill ahead to 12,603', getting rubber across shaker f/motor. Geologist observes we are coming out of zone 3 @ around 12,575'. 05:00 - 05:30 0.50 DRILL P PROD1 Flow off surveys @ 12,567' & 12,537'. 05:30 - 08:30 3.00 DRILL P PROD1 POOH f/motor, bit & resistivity tool. Flag EOP @ 11,500' & monitor well @ 500', well stable, no losses to this point. 08:30 - 11:30 3.00 DRILL P PROD1 OOH, LID bit, motor, & MHA, pick up resistivity tool, new MHA, motor & bit. 11:30 - 14:30 3.00 DRILL P PROD1 RIH, shallow hole test, OK. Tie into EOP flag, subtract 5' correction. 14:30 - 15:15 0.75! DRILL P PROD1 Log gamma tie in, add 1' correction. 15:15 - 15:30 0.25 DRILL P PROD1 Trip on in, clean up area around 12,520' & tag @ 12,602'. 15:30 - 17:00 1.50' DRILL P PROD1 Attempt to log up, pulling tight, backream f/12,602'-12,250'. 17:00 - 20:30 3.50 DRILL P PROD1 MAD pass fl 12,602'-12,250'. Log indicates 1st fault @ 12,400'. 20:30 - 21:00 0.50i DRILL P PROD1 RIH, tag @ 12,602', orient to 60L. 21:00 - 22:15 1.25 DRILL P PROD1 Drill ahead f/12,602'-12,655', 30-60L. ROP 70 fph, 38K up wt, 25K dn. 2.5 bpm @ 3400 FS, 300 dp on motor. 22:15 - 22:30 0.25 DRILL P PROD1 Flow off survey @ 12,610', 2 clicks to 60R. 22:30 - 00:00 1.50 DRILL P PROD1 Drill ahead to 12,692', ROP 45-55 fph. 7/15/2001 00:00 - 00:30 0.50: DRILL P PROD1 Drilling, (ratty), to 12,710', flow off survey. 00:30 - 01:15 0.75; DRILL P PROD1 Orient to 80-90R. Centrifuge gearbox out of commision, centrifuge down. 01:15 - 02:00 0.75' DRILL P PROD1 Drill ahead to 12,730', TF flopped, flow off survey. 02:00 - 02:30 0.50! DRILL P PROD1 Orient TF to 80-90R. 02:30 - 03:00 0.50 DRILL P PROD1 Trouble getting 80-90R w/o flopping, drill ahead to 12,739', very ratty drillng. 03:00 - 03:15 0.25 DRILL P PROD1 Drill to 12,741', stalling, hard & ratty, TF flopped. 03:15 - 04:00 0.75 DRILL P PROD1 Orient to 80-90R. 04:00 - 06:00 2.00: DRILL P PROD1 Drill ahead to 12,770', slow driling ROP down to 10-15 fph. 2.6 bpm/3450, 350 dp on motor. May be 2nd fault. Printed: 7/30/2001 4:00:59 PM BP EXPLORATION Page 4 of 9 Operations Summa Report Legal Well Name: Y-01 Common Well Name: Y-01 B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/15/2001 06:00 - 08:30 2.50 DRILL P PROD1 Drill ahead to 12,820', ROP up to 30-40 fph, then back down. Start new mud around. 08:30 - 08:50 0.33 DRILL P PROD1 Flow off survey 08:50 - 12:00 3.17 DRILL P PROD1 Opt to POOH, check bit, motor, conduct weekly BOPE test & repair centrifuge. Displace hole to new mud w/POOH, flag EOP @ 11,500' & monitor well @ 500', welll stable. Testing choke manifold w/POOH. State Inspector Check Scheve waived witnessing of test. 12:00 - 12:30 0.50 DRILL P PROD1 L/D BHA, rubber in (1) jet indicating motor chunking, bit looked not bad. 12:30 - 12:45 0.25 DRILL P PROD1 Pre job on Testing BOPE, focus on inspecting all connections, valve alignment 12:45 - 17:30 4.75 DRILL P ~ PROD1 Conduct weekly BOPE test against MY, no failures. Install new gearbox on centrifuge w/testing BOPE. 17:30 - 19:30 2.00 DRILL P PROD1 M/U BHA #9, DS49, BHI 1 deg motor, resistivity tool, cio bleed sub & MHA. 19:30 - 22:00 2.50 DRILL P PROD1 Run in hole, shallow hole test, OK. Tie into EOP flag, subtract 33' correction. 22:00 - 23:00 1.00 DRILL P PROD1 Tie in w/gamma, add 3' correction. 23:00 - 23:30 0.50 DRILL P PROD1 Continue in hole, tag @ 12,820'. 23:30- 00:00 0.50 DRILL P PROD1 Orient around to 80-90R. 7/16/2001 00:00 - 00:15 0.25 DRILL P PROD1 Drilling ahead to 12,831', stalled, TF flopped. 00:15 - 00:45 0.50 DRILL P PROD1 Reorient to 70-80R. 00:45 - 01:25 0.67 DRILL P PROD1 Drill ahead to 12,858', ROP 54 fph. 38K up wt, 25K dh. 2.5@ 3100/3500. 400 dp on motor. 2-4K WOB. 01:25 - 01:45 0.33 DRILL P PROD1 Orient around to 60-70R. 01:45 - 03:30 1.75 DRILL P PROD1 Drill ahead f/12,858'-12,954', ROP 40-60 fph, 15% chert @ 12,950', cleaning up. 03:30 - 03:50 0.33 DRILL P PROD1 Orient TF to 80-90L. 03:50 - 05:15 1.42 DRILL P PROD1 Drill ahead f/12,954'-13,033'. ROP 55 fph. Seeing indications of water @ 12,950', 8880 TVD. 05:15 - 06:15 1.00 DRILL P PROD1 Wiper trip to window. No trouble spots. 06:15 - 07:00 0.75 DRILL P PROD1 Orient TF to 70L. 07:00 - 08:00 1.00 DRILL P PROD1 Drill f/13,033'-13,050~, hard spot, TF flopped to high side. 08:00 - 08:30 0.50 DRILL P PROD1 Orient to 90L. 08:30 - 12:30 4.00 DRILL P PROD1 Drill ahead f/13,050'-13170', hard spot @ 13,165'. 12:30 - 13:15 0.75 DRILL P PROD1 Orient around to 90R, flow off survey. 13:15 - 15:50 2.58 DRILL P PROD1 Drill ahead to 13,212', stalling frequently, TF flopped to 160' 15:50 - 16:00 0.17 DRILL P PROD1 Re orient to 80R. 16:00 - 21:30 5.50 DRILL P PROD1 Drill w/frequent stalls, 30-40% chert in samples, slow & re orienting w/TF flops. Drill to 13,250'. ROP down to 8 fph. 21:30 - 00:00 2.50 DRILL P PROD1 POOH to check bit/motor. Rubber over shaker. 7/17/2001 00:00 - 01:00 1.00 DRILL P PROD1 Continue to POOH f/motor, bit. When @ 536', slowing down to monitor well @ 500', pulled coil connector into injector. Damage done to (4) gripper blocks, broke (1) tension rod & bent (1) tension rod. LCIR-2001-1R-54671. 01:00 - 02:00 1.00 DRILL P PROD1 Download USMPR & L/D BHA #9. 02:00 - 06:00 4.00 DRILL N RREP PROD1 Replace tension rods, repair blown seal. Change out all gripper PROD1 blocks & service injector. 06:00 - 10:00 4.00 DRILL P ;Flat spot in coil 6' from end, (not due to previously mentioned ~mishap). Cut 100' off coil & weld on new coil connector, pull & !pressure test same, OK. 10:00 - 11:45 1.75 DRILL P PROD1 ~ M/U BHA #10, Hughes bi center, BHI 1 deg motor, cio orienter, Printed: 7/30/2001 4:00:59 PM BP EXPLORATION Page 5 of 9 Operations Summary Report Legal Well Name: Y-01 Common Well Name: Y-01B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours IActivity Code NPT Phase Description of Operations 7/17/2001 10:00 - 11:45 1.75 DRILL P PROD1 mha & bleed sub. Surface test orienter, OK. 11:45 - 14:30 2.75 DRILL P PROD1 RIH w/BHA #10, shallow hole test, OK. Tie into EOP. Corrected -24'. 14:30 - 15:40 1.17 DRILL P PROD1 Tie in gamma ray. Corrected -7'. 15:40 - 16:30 0.83 DRILL P PROD1 RIH. Tag TD @13246'. 16:30 - 17:30 1.00 DRILL P PROD1 Orient TF to 80R. 17:30- 19:20 1.83 DRILL P PROD1 Drilling. Drill to 13291'. 2.6/3600/75R 19:20 - 19:45 0.42 DRILL P PROD1 TF flopped to 100R. Orienting. 19:45 - 20:20 0.58 DRILL P PROD1 Drilling. stalled. TF at 120 R. 20:20 - 21:20 1.00 DRILL P PROD1 Having hard time to keep TF. Had to re-oriented several times. Once we got back to drilling TF flopped to 100-120 R. 21:20 - 22:40 1.33 DRILL ,P PROD1 Unable to get signal from orienter. POH 100' and try again w/o success. RIH to bottom. No success. 22:40 - 00:00 1.33' DRILL P PROD1 POOH for orienter. 7/18/2001 00:00 - 02:40 2.67 DRILL P PROD1 Continue POH. 02:40 - 03:30 0.83 DRILL P PROD1 OOH. L/D orienter. Test sperry orienter on surface. OK. Download USMPR. Check bit and bleed sub. OK. 03:30 - 03:45 0.25 DRILL P PROD1 MU orienter and MHA. 03:45 - 06:15 2.50 DRILL P PROD1 RIH wBHA #11. Shallow hole test. OK. Cont. rib. 06:15 - 06:25 0.17 DRILL P PROD1 Tie into EOF).· -30' correction. 06:25 - 07:10 0.75 DRILL P PROD1 Tie in gamma ray. No correction. Cont rih. 07:10 - 07:30 0.33 DRILL P PROD1 Tag @13301'. 07:30 - 07:45 0.25 DRILL P PROD1 Orient TF to 80 R. 07:45 - 10:50 3.08 DRILL P PROD1 Drill ahead. 2.6/3400/70R. Slow ROP. Pump sweep of 25 bbls of new FIo pro. Drill to 10340'. 10:50 - 16:00 5.17 DRILL P PROD1 Drill. 2.6/3700/90R. Drill to 13369'. Samples show about 50% chert. 16:00 - 18:00 2.00 DRILL P PROD1 Stalled out. Not able to make any progress. POH to change bit and motor. Geologist confirm we are in zone 3. 18:00 - 23:00 5.00 DRILL P PROD1 POH to change bit. EOP @11500' 23:00 - 00:00 1.00 DRILL P PROD1 OOH. Download USMPR data. Change out bit and motor. 7/19/2001 00:00 - 00:30 0.50 DRILL P PROD1 PJSM. P/U motor. MU BHA #12 00:30 - 02:40 2.17 DRILL P PROD1 RIH wi new bit and motor. SliT OK. 02:40 - 02:50 0.17 DRILL P PROD1 Tie into EOP. -32' correction. 02:50 - 04:00 1.17 DRILL P PROD1 Tie in gamma ray. No correction. Continue RIH. 04:00 - 04:30 0.50 DRILL P PROD1 Reamed undergauge hole f/13356' to 13367'. 04:30 - 06:00 1.50 DRILL P PROD1 Drill. Stalling hard to get started. 2.5/3700/60R. 06:00 - 10:30 4.50 DRILL P PROD1 Drill. 2.5/3700/80R. 37K up. 23k dwn. 10:30 - 12:00 1.50 DRILL P PROD1 Drill to 13420'. 2.5/3700/90R. ROP 8ft/hr. 12:00-15:30 3.50 DRILL P PROD1 POHforbit. Monitor well at 500'. OK. 15:30 - 17:00 1.50 DRILL P PROD1 PJSM. Download USMPR data. LID BHA #12. 17:00 - 18:00 1.00 DRILL P PROD1 MU newtricone bit. RIH w/BHA#13 18:00 - 21:00 3.00 DRILL P PROD1 SHT. OK. Continue RIH to EOP. Corected -53'. 21:00 - 22:00 1.00 DRILL P PROD1 Reamed from 13372 to 13420'. 22:00 - 00:00 2.00 DRILL P PROD1 Drill to 13450'. 2.5/3650/70R. ROP 7 fi/hr. 7/20/2001 00:00 - 01:30 1.50 DRILL P PROD1 Drill. 2.5/3700/80R. Drill to 13452'. Stacking with litle motor work 01:30 - 01:50 0.33 DRILL P PROD1 Orienter not clicking. 01:50 - 05:30 3.67 DRILL P PROD1 POh to change bit & orienter. EOP @11500'. Monitor well @500'. OK 05:30 - 06:30 1.00 DRILL P PROD1 OOH.. Rack back injector. Download USMPR data. 06:30 - 08:15 1.75 DRILL P PROD1 LD BHA #13 and P/U BHA #14. Change out bit and orienter. 08:15-10:40 2.42 DRILL P PROD1 RIH. SHT OK. Printed: 7/30/2001 4:00:59 PM BP EXPLORATION Page 6 of 9 Operations Summa Report Legal Well Name: Y-01 Common Well Name: Y-01B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations ~7/20/2001 10:40 - 10:50 0.17 DRILL P PROD1 Tie into EOP. Corrected 48'. 10:50 - 11:30 0.67 DRILL P PROD1 Tie in gamma ray. Corrected 7'. 11:30 - 12:30 1.00 DRILL P PROD1 Continue RIH. 23K dwn weight. 37K up weight. 12:30 - 18:00 5.50 DRILL P PROD1 Orient TF to 80L. Drill to 13497'. 2.5/3800/90R 18:00 - 21:45 3.75 DRILL P PROD1 Drill. stacking with little motor work. Drill to 13520'. 2.5/3800/90R. 21:45 - 22:10 0.42 DRILL P PROD1 Log from 13480' to 13460'. 22:10 - 00:00 1.83 DRILL P PROD1 , POH to change bit. EOP @ 11500'. 7/21/2001 00:00 - 01:45 1.75 DRILL P PROD1 Continue POOH. 01:45 - 02:30 0.75 DRILL P PROD1 OOH. Download USMPR. Change out bit, motor and MHA 02:30 03:30 1.00 DRILL P PROD1 M/U BHA #15 03:30- 04:00 0.50 DRILL P PROD1 RIH. SHT. OK. 04:00 - 06:00 2.00 DRILL P : PROD1 Continue RIH. 06:00 - 06:50 0.83 DRILL P ~PROD1 Tie into EOP. Corrected -27'. Tie in gamma ray. No correction. 06:50 - 07:30 0.67 DRILL P PROD1 Cont rih. Tag @13456'. Pulled heavy. 07:30 - 08:15 0.75 DRILL P PROD1 Orient to 60R. 08:15 - 09:00 0.75 DRILL P PROD1 Ream hole from 13390' to 13514'. 09:00 - 09:15 0.25 DRILL P PROD1 Orient to 90R 09:15 - 11:10 1.92 DRILL P PROD1 Drill ahead, swap out to new mud. 11:10-13:00 1.83 DRILL P PROD1 Wiper trip to the window. Cleantrip 13:00 - 13:50 0.83 DRILL P PROD1 Drill. 2.6/3650/110R. Drill to 13640'. Inclination 95.9 deg. 13:50 - 14:10 0.33 DRILL P PROD1 Short trip 100'. 14:10 - 15:30 1.33 DRILL P PROD1 Orient TF to 80 R 15:30 - 16:30 1.00 DRILL P PROD1 Drill. 2.6/360/95R. Drill to 13730'. 16:30 - 18:00 1.50 DRILL P PROD1 Flow off survey. Orient TF to 90L 18:00 - 20:00 2.00 DRILL P PROD1 Drill to 13858'. 2.6/3600/90L. Loosing 5 bbl/hr. 20:00 - 20:30 0.50 DRILL P PROD1 POH to flow off survey. 24 k wt dwn. 37K wt up. 20:30 - 21:30 1.00 DRILL P PROD1 Drill to 13914'. 2.6/3600/80L 21:30 - 23:15 1.75 DRILL P PROD1 Wiper trip to the window. Hole in good condition. 23:15 - 00:00 0.75 DRILL P PROD1 Drill to 13929'. 2.6/3600/80L. 7/22/2001 00:00 - 00:15 0.25 DRILL P PROD1 Flow off survey. 00:15 - 01:30 1.25 DRILL P PROD1 Driling orienter not working 2.6/3800/90L. 01:30 - 02:00 0.50 DRILL P PROD1 Driling stacking. 02:00 - 04:00 2.00 DRILL P PROD1 Geologist thinks we are in shale. Conditioning hole. Wait on town 04:00-06:00 200 DRILL P PROD1 Wiper trip to the window. Pulltight@11740' 06:00 - 07:00 1.00! DRILL P PROD1 RIH. Ream through 1174' to 11760'. 07:00 - 07:15 0.25: DRILL P PROD1 Drill ahead. TF flopped to 30R 07:15 - 09:45 2.50i DRILL P PROD1 Orienting TF to 90L. 09:45 - 10:45 1.00 DRILL P PROD1 Drill to 14000'. 2.6/3900/90L. Continue having problems w/orienter. 10:45 - 15:00 4.25 DRILL P PROD1 POH to change out orienter. EOP @11500'. Test choke manifold in the way out. Monitor well at 500'. OK. 15:00-16:00 1.00 DRILL P PROD1 PJSM. OOH. L/DBHA#15 16:00 ~ 22:30 6.50 DRILL P PROD1 BOPE test. Witnessed by John Crisp. 22:30 - 00:00 1.50 DRILL P PROD1 MU BHA #16. Test Weatherford orienter. OK. 7/23/2001 00:00 - 02:30 2.501 DRILL P PROD1 RIH. SliT. OK 02:30 - 03:15 0.75! DRILL P PROD1 Tie into EOP. -43' correction. Tie in gamma ray 10'. Continue RIH. 03:15 - 04:10 0.92' DRILL P PROD1 Continue rih. 04:10 - 05:00 0.83~ DRILL P PROD1 Orient TF to 80L 05:00 - 06:00 1.00 DRILL P PROD1 Drill ahead. 2.6/3900/40L. Drill to 14058'. Printed: 7130/2001 4:00:59 PM BP EXPLORATION Page 7 of 9 Operations Summary Report Legal Well Name: Y-01 Common Well Name: Y-01B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/23/2001 06:00 - 06:40 0.67 DRILL N STUC PROD1 Got stuck. Work pipe. Pull 62K. Got free. Condition hole. 06:40 - 06:50 0.17 DRILL P PROD1 Drill to 14064'. 2.5/4000/80L. 06:50 - 07:30 0.67 DRILL P PROD1 Orient TF to 90L. 07:30 - 08:00 0.50 DRILL P PROD1 Drill ahead. 2.5/4000/80L. Drill to 14129'. 08:00 - 08:30 0.50 DRILL P PROD1 Survey @ 14120'. 08:30 - 08:45 0.25 DRILL P PROD1 Orient TF to 20L. 08:45 - 09:30 0.75 DRILL P PROD1 Drill to 14175'. 2.5/4100/30L. Continue w/high circulating pressure. 09:30 - 11:35 2.08 DRILL P PROD1 Orient TF to 70L. 11:35 - 12:30 0.92 DRILL P PROD1 Drill. 2.5/4100/75L. Drill to 14250'. 12:30-15:30 3.00 DRILL P PROD1 Wiper trip to the window. Cleantrip. 15:30 - 16:45 1.25 DRILL P PROD1 Orientt TF to 70L. 16:45 - 17:00 0.25 DRILL P PROD1 Drill to 14257'. TF flopped to 30L. 17:00 - 18:00 1.00 DRILL P PROD1 Orient to 70L. 18:00 - 19:20 1.33 DRILL N SFAL PROD1 Drill ahead. Pump #1 down. POH to swap to pump #2. 19:20 - 19:45 0.42 DRILL P PROD1 Orient to 90L 19:45 - 21:40 1.92 DRILL P PROD1 Flow off survey. Orient to 90L. 21:40 - 22:30 0.83 DRILL P PROD1 TD well @14373'. 22:30 - 23:30 1.00 DRILL P PROD1 Flow off survey. Unable to get it. 123:30 - 00:00 0.50 DRILL P PROD1 Mad pas from 14300' - 14240'. Start loosing 40 bbls/hr. 7/24/2001 ~00:00 - 00:30 0.50 DRILL P PROD1 Continue w/mad pas. Loses @lbb/min i00:30 - 00:45 0.25 DRILL P PROD1 RIH to bottom for survey i00:45 - 01:50 1.08 DRILL P PROD1 Unable to get survey. POH to tie in. 01:50 - 02:20 0.50 DRILL P PROD1 Tie in gamma. +9' correction. 02:20 - 03:30 1.17 DRILL P PROD1 RIH to bottom to correct TD. Tag bottom at 14380'. 03:30 - 04:40 1.17 DRILL P PROD1 POH laying in LCM. Lay in36 bbls LCM pill. Pill composition: 20 bbls FIo-Pro, 14 bbls KC1,15 ppb Mix II fine. 15 ppb OM seal. 04:40 - 05:30 0.83 DRILL P PROD1 Pull into the casing. Squeeze LCM into formation. Hold 100 psi on wellhead for 10 min. 05:30 - 05:50 0.33 DRILL P PROD1 Drift run to bottom 05:50 - 06:00 0.17 DRILL P PROD1 Stacked @ 12749'. Ream tigh spots. Continue drift hole. 06:00 - 07:45 1.75 DRILL P PROD1 Tag BTM @ 14380'. 07:45 - 08:30 0.75 DRILL P PROD1 Circulate new mud to the bit. 08:30 - 13:30 5.00 DRILL P PROD1 POOH with coil and BHA. Flag coil at 8700' EOC and 11,100' EOC. 13:30 - 15:30 2.00 DRILL P PROD1 Lay down BHA and download USMPR data. 15:30 - 18:00 2.50 DRILL P PROD1 Install Baker connector and pump dart through coil. Coil volume is 59 barrels. 18:00 - 19:00 1.00 DRILL P PROD1 Rack back injector and remove dart catcher. 19:00 - 19:15 0.25 CASE P COMP PJSM prior to picking up and running the liner. 19:15 - 00:00 4.75 CASE P COMP Make up the 2-7/8" x 3-3/16" liner assembly. 7/25/2001 00:00 - 04:45 4.75 CASE P COMP Continue to make up liner assembly, fill liner with mud, hook up coil to liner. 104:45 - 07:45 3.00 CASE P COMP RIH with coil and liner assembly. Tie in depth with flag at 8700' (-22' corr'n) EOP. Cont RIH to 14100' seeing some losses. 07:45 - 08:30 0.75 CASE P COMP Cont RIH. Started taking weight below 14100'. Work thru tight spot at 14285'. Flag at 11100' EOP. No corr'n. Work down to 14370'- 10' off bottom. No further progress. Top of liner at 11,118'. 08:30 - 08:45 0.25 CASE P COMP Position reel for ball drop and straighten wraps on reel. 08:45 - 09:00 0.25 CASE P COMP Safety meeting prior to dropping ball. 09:00 - 09:45 0.75 CASE P COMP Load and launch 5/8" ball. Pump on seat at 1.2 bpm in 0.6 bpm Printed: 7/30/2001 4:00:59 PM BP EXPLORATION Page 8 of 9 Operations Summa Report Legal Well Name: Y-01 Common Well Name: Y-01B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/25/2001 09:00 - 09:45 0.75 CASE P COMP out initial. Ball on seat at 45 bbl away & shear off liner at 4400 psi - OK. Confirm liner released. 09:45 - 12:00 2.25 CEMT !P COMP Displace hole to 2 % KCl. 1.6/0.8 bpm initial, improving to 2.2/2.1 bpm with KCI back to surface. 12:00 - 14:30 2.50 CEMT P COMP Cont circ for additional cleanup 2.5~2.3 bpm 1450 psi. Avg 15 bph loss rate. 14:30 - 15:30 1.00 CEMT P COMP RU cementers. Spot water and dirty vac trucks. Plan to pump 30 barrels of cement slurry (an additional 5 barrels to account for losses while cementing); 15:30 - 15:45 0.25 CEMT i P COMP PJSM prior to cementing. 15:45 - 16:15 0.50 CEMT P COMP Batch up cement and rig up to take returns. 16:15 - 16:25 0.17 CEMT i p COMP Switch circulating to DS. Pump 3 bbls of 2% KCI water and pressure test lines to 4000 psi. 16:25 - 16:45 0.33 CEMT P COMP Pump 30 barrels of cement slurry (15.8 ppg) at 2.2 to 2.4 BPM and 2300 psi. 16:45 - 17:00 0.25 CEMT P COMP Clear cement from lines. Load and launch dart. 17:00 - 17:30 0.50 CEMT P COMP Displace the cement with DS at 2.5 BPM and 900 psi. returns were 2.2 BPM. With 50 barrels of displacement pumped, the cement was at the shoe. With 55 barrels of displacement pumped the pump rate was reduced to 2 BPM. Dart landed ' with 59.6 barrels of displacement pumped. Continue displacement at 2.0-2.25 BPM and 1500 psi. Bump plug with 79.8 barrels of displacement pumped and 3,000 psi. ClP at 1730 hrs. 17:30 - 17:40 0.17 CEMT P COMP Bleed off pressure and test floats - ok. Pressure up to 500 psi. Pick up and unsting from liner - ok. 17:40 - 22:00 4.33 CEMT P COMP POOH with coil and Baker CTLR tools while circulating the hole. Flag coil at 7700' EOC while POOH. Lay down Baker CTLR tools. 22:00 - 23:45 1.75 CLEAN P COMP Flush BOP stack. Prepare to P/U BHA. 23:45 - 00:00 0.25 CLEAN P COMP PJSM prior to picking up clean out BHA and 1-1/4" CSH. 7/26/2001 00:00 - 04:00 4.00 CLEAN P COMP Pick-up BHA and 1-1/4" CS Hydril to clean out liner. MU injector head. 04:00 - 09:30 5.50 CLEAN P COMP RIH with clean out BHA and tag latch collar @ 14296' (depth uncorrected to log). Observed little or no cement in liner. 09:30 - 10:30 1.00 CLEAN P COMP PJSM Drop 5/8" ball and pump down to circ sub seat. 10:30 - 11:00 0.50 CLEAN P COMP I Pump open circ sub and displace well to clean KCL. 11:00 - 13:30 2.50 CLEAN P COMP POOH while displacing well to clean KCL. Flag EOP @ 7700'. 13:30 - 14:30 1.00 CLEAN P :COMP Line up & tested liner lap to 2000 psi for 30mins. Pressure held OK. 14:30 - 15:30 1.00 CLEAN P COMP Continue POOH cleanout assy to 1-1/4" CSH. 15:30 - 19:30 4.00 CLEAN P COMP Rack back 103 jts 1-1/4" CS Hydril & L/D BHA. 19:30 - 20:00 0.50 EVAL P COMP PJSM, HNHM and pre-job review on logging job. Review 3rocedures and emphasize handling of radioactive source. 20:00 - 22:30 2.50 EVAL P COMP P/U SWS CNL/GR/CCL tool & M/U to 1-1/4" CS Hydril tubing. 22:30 - 00:00 1.50 EVAL P COMP M/U coil to BHA, RIH & synchronize depth tracking with SWS. Continue RIH to 9000'. 7/27/2001 00:00 - 01:00 1.00 EVAL P COMP RIH SWS CNL/GR/CCL and tie into EOP flag (-51 correction). Continue RIH to 11800'. 01:00 - 04:00 3.00 EVAL P COMP Log down @ 30fpm from 11800' to PBTD (tagged @ 14297') & log back up from PBTD to 11800'. Meanwhile lay-in new 100k LSRV FIo-Pro to TOL. 04:00 - 06:00 2.00 EVAL P COMP Paint EOP flag @ 7700' & continue POOH. Printed: 7/30/2001 4:00:59 PM BP EXPLORATION Page 9 of 9 Operations Summary Report Legal Well Name: Y-01 Common Well Name: Y-01 B Spud Date: 10/22/1979 Event Name: REENTER+COMPLETE Start: 7/8/2001 End: 7/28/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 7/28/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/27/2001 06:00 - 08:30 2.50 EVAL P COMP Rack back injector & 1-1/4" CSH. 08:30 - 09:00 0.50 EVAL P COMP PJSM on handling of memory logging tool. L/D logging tools & download same. Confirm PBTD @ 14318'. 09:00 - 17:30 8.50 EVAL P COMP W.O. confirmation of perforation intervals. Meanwhile carryout general rig housekeeping. 17:30 - 18:00 0.50 PERF P COMP Load 34 guns on pipe rack and PJU gun handling equipment. 18:00 - 18:30 0.50 PERF P COMP PJSM & HNHM on perforation job. Emphasize on safe gun handling procedures & good communication. 18:30 - 20:30 2.00 PERF P COMP P/U & RIH 34 jts of 2" PJ 2006 HSD 4spf perforating guns. 20:30 - 22:30 2.00 PERF P COMP P/U & RIH 81 jts 1-1/4" CSH workstring. 22:30 - 00:00 1.50 PERF P COMP M/U injector. RIH with perf guns to 7400'. 7/28/2001 00:00 - 01:30 1.50 PERF P COMP Continue RIH & tag PBTD @ 14316.83'. P/U to up wt of 38k & reset depth counter to 14318'. PUH to 14300.7'. 01:30 - 02:15 0.75 PERF P COMP PJSM. Load 5~8" ball &circ down while positioning guns for bottom shot at 14300'. Pump ball on seat slowing to 1 bpm. Ball on seat @ 60 bbls away. 02:15 - 02:30 0.25 PERF P COMP Pressure up to 2850psi & observe guns fire. Perf Intervals: 13580'-13630', 13661'-13760', 13790'-13850', 13980'-14030' 14070'-14172' and 14200'-14300'. 02:30 - 06:00 3.50 PERF P COMP POOH to 11000' & monitor well - static. Continue POOH & monitoring well - OK. 06:00 - 09:00 3.00 PERF P COMP PJSM. Rack back injector. R/U & L/D 1-1/4" CS Hydril tubing work string. 09:00 - 09:15 0.25 PERF P COMP PJSM on handling & laying down perf guns. Emphasis on trapped pressures. 09:15 - 11:30 2.25 PERF P COMP LID perf guns. ASF. Monitor well-well stable. 11:30 - 14:00 2.50 RIGD P COMP M/U stinger & nozzle. RIH to 2000'. POOH 2:1 & FP well to methanol/water. RIB injector & LID nozzle. 14:00 - 15:30 1.50 RIGD P COMP R/U DSM lubricator. Set BPV. R/D lubricator. 15:30 - 16:30 1.00 RIGD P COMP Blow down all mud lines and stack. Clean pits. 16:30 - 18:00 1.50 RIGD P COMP Nipple down BOPE, nipple up tree cap, secure well. Rig released @ 18:00 hrs, 07/28/01. Printed: 7/30/2001 4:00:59 PM ObP BP Amoco Baker Hughes INTEQ Survey Report iNTEQ Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y-01 Wellpath: Y-O1B Date: 8/6/2001 Time: 14:17:17 Page: 1 Co-ordinate(NE) Reference: Well: Y-01, True North Vertical (TVD) Reference: 2: 01 12/27/1996 00:00 75.0 Section (~S) Reference: Well (0.00N,0.00E,190.00Azi) Survey Calenlntion Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: BGGM2001 Site: PB Y Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5948541.48 ft 647748.73 ft Latitude: 70 16 0.041 N Longitude: 148 48 18.991 W North Reference: True Grid Convergence: 1.12 deg Well: Y-01 Y-01 Well Posltion: +N/-S 566.12 ff Northing: 5949065.00 ff +E/-W-2163,20 ff Easting: 645575.00 ff Position Uncertainty: 0.00 ft Slot Name: 01 Latitude: 70 16 5.606 N Longitude: 148 49 21.958 W Wellpath: Y-01B Drilled From: Y-01A 500292039402 Tie-on Depth: 12030.00 ft Current Datum: 2: 01 12/27/1996 00:00 Height 75.02 ft Above System Datum: Mean Sea Level Magnetic Data: 6/26/2001 Declination: 26.56 deg Field Strength: 57485 nT Mag Dip Angle: 80.76 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ff ff ff deg 0.00 0.00 0.00 190.00 Survey: MWD Start Date: 7/24/2001 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Annotation it ' i 'ft : ,', : : ' , , , ,: , ',' ' , 2oa=°°o' ' [14380,00 8820.88 TD Survey 'MD"" : incl AZlm TVD SSTyD 'N/S,, i MaPN': MaPE': ' DLS VS ' : "',: ": deg , fi,: ' , fi:, ~:ff:: :fi:', ,, deg/100ff, 'fi: 12030.00 60.70 27.71 8701.28 8626.26 6390.36 2144.86 5955495.16 647595.72 0.00 -6665.73 12080.00 67.59 45.00 8723.20 8648.18 6426.27 2171.54 5955531.57 647621.69 33.98 -6705.72 12150.00 69.40 68.40 8749,17 8674.15 6461.64 2225.53 5955567.98 647674.99 31.18 -6749.93 12186.00 62.80 78.60 8763.78 8688.76 6471.04 2257.00 5955577.98 647706.26 31.71 -6764.65 12218.00 55.90 87.70 8780.11 8705.09 6474.39 2264.26 5955581,86 647733.46 32.58 -6772.69 12248.00 58.40 93.40 8796,39 8721.37 6474.13 2309.44 5955582,09 647758.64 18.00 -6776.80 12278.00 63.10 100.70 8811.06 8736.04 6470.88 2335.38 5955579,34 647784.63 26.37 -6778.11 12329.00 68.30 110.60 8832.09 8757.07 6458.29 2380.03 5955567.62 647829.51 20.41 -6773.46 12387.00 66.20 122.90 8854.59 8779.57 6434.32 2427.69 5955544.57 647877,62 19.88 -6758.13 12417.00 65.50 127.50 8866.87 8791.85 6418.55 2450.05 5955529.24 647900.28 14.18 -6746.48 12449.00 66.70 132,00 8879.84 8804.82 6399.64 2472,53 5955510.97 647923.12 13.39 -6731.96 12480.00 69.10 136.30 8891.50 8816.48 6379.64 2493.13 5955491.37 647944.10 1.5.00 -6715.64 12537.00 73.30 138.40 8909,87 8834.85 6340.15 2529.67 5955452.40 647981.3,9 8.15 -6683.10 12567.00 75,70 137.30 8917.89 8642.87 6318.72 2549.07 5955431,35 648001.20 8.75 -6665.37 12610.00 80.10 131.70 8926.91 8851.89 6289.28 2579.05 5955402.50 648031.74 16.33 -6641.58 12664.00 86.10 134.50 8933,39 8858,37 6252.67 2618.16 5955366,66 648071.56 12.24 -6612.32 12693.00 87.40 138.70 8935.04 8860.02 6231.64 2638.05 5955346.01 648091,85 15.14 -6595.06 12731.00 85.40 144.30 8937,42 8862,40 6201.97 2661.65 5955316.81 648116.01 15.62 -6569.94 BP Amoco Baker Hughes INTEQ Survey Report INTEQ C. empaay: BP Amoco Date: 8/6/2001 'rmae: 14:17:17 Page: 2 FleM: Prudhoe Bay Ce-erdtaate(NE) Refereace: Well: Y-01, True North Site: PB Y Pad Vertical (TVD) Reference: 2: 01 12/2711996 00:00 75.0 Well: Y..01 Seetlea (VS) Kefem]aee: Well (0.00N,0.00E,190.00Azi) Wellpath: Y-01B Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD I~el Azim TVD SSTVD N/S E/W MapN MapE DLS VS ff deg deg ff ff ff ff ff ff deg/100ft ff 12782.00 87.90 152.40 8940.41 8865.39 6158.67 2688.34 5955274.04 648143.53 16.59 -6531.93 12816.00 86.30 160.20 8942.13 8867.11 6127.60 2701.98 5955243.24 648157.77 23.39 -6503.70 12845.00 85.50 1 64.70 8944.21 8869.19 6100.03 2710.70 5955215.85 648167.02 15.72 -6478.06 12884.00 85.90 169.70 8947.13 8872.11 6062.12 2719.31 5955178.11 648176.36 12.83 -6442.22 12938.00 85.60 176.00 8951.14 8876.12 6008.71 2726.01 5955124.85 648184.09 11.65 -6390.79 12974.00 85.10 174.20 8954,06 8879.04 5972.96 2729.07 5955089.17 648187,85 5.17 -6356.12 13037.00 91.90 169.00 8955.71 8880.69 5910.72 2738.27 5955027.12 648198,25 13.58 -6296.42 13063.00 92.20 164.70 8954.78 8879.76 5885.42 2744.18 5955001.94 648204.64 16.57 -6272.53 13099.00 91.00 169.00 8953.77 8878.75 5850.39 2752,36 5954967.08 648213.50 12.40 -6239.45 13131.00 90.80 172.10 8953,27 8878,25 5818.83 2757,62 5964935.63 648219.37 9.71 -6209.29 13166.00 91.50 175.30 8952.56 8877.54 5784.06 2761.46 5954900.94 648223,88 9.36 -6175.70 13208.00 92.30 179.10 8951.17 8876.15 5742.14 2763.51 5954859,07 648226.74 9.24 -6134,78 13256.00 91.90 187.60 8949.41 8874.39 5694.29 2760,71 5954811.18 648224,86 17.72 -6087.18 13301.00 92.40 191,50 8947.72 8872,70 5649.96 2753.25 5954766.71 648218.26 8.73 -6042.22 13330.00 93.10 191.50 8946.33 8871.31 5621.57 2747.47 5954738.23 648213.04 2.41 -6013.26 13369.00 92,50 196.00 8944.42 8869.40 5583.75 2738.21 5964700.23 648204.52 11.63 -5974.40 13409,00 97.10 199,50 8941.08 8866.06 5545.80 2726.07 5954662.06 648193.11 14.43 -5934.92 13481.00 97.50 211.80 8931.89 8856.87 5481.55 2695.22 5964597.23 648163.51 16.95 -5866.29 13535.00 98.40 215,70 8924.42 8649.40 5437.09 2665.52 5954552.20 648134.67 7.34 -5817.35 13593.00 95.90 226.60 8917,18 8842.16 5393,83 2627,70 5954508.23 648097.70 19.14 -5768.18 13643.00 92.50 230.50 8913,52 8838.50 5360.64 2590.33 5954474.52 648060.98 10.33 -5729.20 13686,00 94.80 236.60 8910,78 8835.76 5335.35 2555,64 5954448.38 648026.99 15.13 -5698.11 13715.00 95.90 240.30 8908.07 8833.05 5320.25 2531.24 5954432.80 648002.69 13.26 -5678.97 13744,00 94.70 239.60 8905,40 8830.38 5305.79 2506,24 5954417.86 647977.98 4.79 -5660.39 13807.00 95.60 233.60 8899,74 8824.72 5271.27 2453.88 5954382.33 647926.30 9.59 -5617.30 13861.00 96.60 229.80 8893.99 8818.97 5238.00 2411.75 5954348,26 647884,82 7.24 -5577.22 13891.00 96.70 227,00 8890.52 8815.50 5218,22 2389.47 5954328.05 647862.93 9.28 -5553.87 13942.00 96.80 221.30 8884.52 8809.50 5181.89 2354.21 5954291,05 647828,38 11.10 -5511.97 13992,00 96.90 218.20 8878.56 8803,54 5143.73 2322.47 5954252.29 647797.39 6.16 -5468.88 14044,00 96.90 203.40 8872.27 8797.25 5099.51 2296,11 5954207.57 647771.89 28.25 -5420.75 14083,00 94.90 194.30 8868.26 8793,24 5062.64 2283.60 5954170.67 647760,09 23.77 -5382,47 14130.00 93.00 184.40 8865.01 8789.99 5016.63 2275.99 5954124,33 647753,38 21.40 -5335.64 14173.00 99.40 177.00 8860.36 8785.34 4973.94 2275.45 5954081.64 647753.67 22.67 -5293.50 14203.00 99.10 169.30 8855.53 8780.51 4944.57 2278,98 5954052.34 647757.77 25.35 -5265,19 14261.00 101.70 155,60 8845.02 8770.00 4890.31 2296.11 5953998.42 647775.94 23.66 -5214.73 14380,00 101.70 155.60 8820,88 8745.86 4764.19 2344,25 5953893.26 647826,12 0.00 -5118.58 ~P A~oco REFERENCE INFORMATION 8250 8300 8350 8400 ~5450 ~SS00 .~8550 ~"8600 '~5650 ~8700 ~ 88oo M Model BGGM2001 63OO 6200 ;~55oo 5200 5100 5000 490O 4500 895O -6950 6900-6850~800 6750-6700 6650 6600-6550 6500-6450-6400~350-6300-6250-6200-6150 6100-6050-6000-5950 5900-5550~5800~5750~5700~5650 5600~5550-5500-5450-5400 5350-5300-5250~5200 5t50 5100 5050 Vert~c~ Section at ~90.00° [50f¢~n] 8/6/2001 2;23 PM 08/08/01 Schlumberger Alaska Data & Consulting Services 3940 Arctic BIvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1361 Company: State of Alaska Alaska Oil & Gas Cons Corem Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blueline Sepia Prints CD D.S. 1-11 / ~ -/-~.,,~-'/ 21352 CBL 07/28/01 2 ~.s.,~-o~ ~_~-~ ~,~ us,~ o~,~,o, Z-14A ('~ ". ~-~/ 21353 SCMT 07/27/01 2 Y-01B ~ ~ / --rO ~(~ 21358 MCNL 07127/0t PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: RECEIVED' AUG 2'1 2001 Alaflr, a 0il & Gas Cons. Commimie, Anch~Bge Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Received ALASKA OIL AND GAS CONSERVATION COMPHSSION TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Thomas McCarthy · CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519 Re: Prudhoe Bay Unit Y-01B BP Exploration (Alaska) Inc Permit No: 201-076 Sur Loc: 1205' SNL, 4516' WEL, Sec. 34, TllN, R13N, UM Btmhole 'Loc. 3674' NSL, 2209' Wel, Sec. 27, T11N, R13E, UM Dear Mr. McCarthy: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this ~ ~ day of/t/~y ,~ 2001 jjc/Enclosures CC' Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. 2O AAC 25.OO5 I [] Exploratory [] Stratigraphic Test [] Development Oil la. Type of work [] Drill [] Redrill lb. Type of well [] Service [] Development Gas [] Single Zone [] Multiple Zone [] Re-Entry [] Deepen 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 77' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028287 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1205' SNL, 4516' WEL, SEC. 34, T11N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 5152' NSL, 2376' WEL, SEC. 27, T11N, R13E, UM Y-01B Number 2S100302630-277 At total depth 9. Approximate spud date 3674' NSL, 2209' WEL, SEC. 27, T11N, R13E, UM 05-10-01 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028284, 1605' MDI No Close Approach 2560 14235' MD / 8823' TVD 16. To be completed for deviated wells ~ 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 12030' MD Maximum Hole Angle 105 ° Maximum surface 2244 psig, At total depth (TVD) 8800' / 3300 psig '18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casin,q Wei,qht Grade Couplin,q Len,qth MD TVD MD TVD (include sta,qe data) 3-3/4" 2-7/8" 6.16# L-80 ST-L 3110' 11125' 8070' 14235' 8823' 28 cu ft Class 'G' I 1' L;I"' I V 19. To be completed for Redrill, Re-entry, and Deepen Operations. /~ ~'~{ ~ ;~ Present well condition summary Total depth: measured 13246 feet Plugs (measured) Alat~ Oil & Gas Cons. Commission true vertical 9172 feet Anchorage Effective depth: measured 13162 feet Junk (measured) true vertical 9135 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" x 30" 8 cu yds Arctic Set Concrete 110' 110' Surface 2690' 13-3/8" 5004 cu ft Permafrost 2690' 2690' Intermediate 11778' 9-5/8" 1714 cu ft Class 'G", 130 cu ft 'PF' 11778' 8528' Production Liner 1738' 7" 531 cu ft Class 'G' 11232' - 12970' 8141' - 9055' Liner 2109' 4-1/2" 225 cu ft Class 'G' 11137' - 13246' 8078' - 9172' Perforation depth: measured Open: 12640'-12660', 12750'-12794', 12833'-12853', 12886'-12900' Sqz: 12524'-12528', 12534'-12544', 12853'-12878', 12910'-12930', 12942'-12952', 12990'-13010' true vertical Open: 8919'-8926', 8962'-8980', 8996'-9005', 9018'-9024' Sqz: 8876'-8878', 8880'-8883', 9005'-9015', 9032'-9037', 9042-9047', 9063'-9071' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Thomas McCarty, 564-5697 Prepared By Name/Number: Sondra Stewman, 564-4750 best 21. I hereby certify that the foregoing is true and correct to the of my knowledge Signed Thomas McCarty/'"'~..~.~ /~¢"'. C~.'t~~ Title CT Drilling Engineer Date 'P~mi't Number' '" "I APi Number ....... i .... ~'~pr~aI.Date' .. '1 S~'e'c~v~rletter 150- 029-20394-02 I %. ( -01 I for other requirements.. Conditions of Approval: Samples Required [] Yes [] No Mud Log Required [] Yes J~ No Hydrogen Sulfide Measures []Yes [] No Directional Survey Required [] Yes [] No Pressure forBOPE []2K []3K []4K []5K []10K []15K 'l~.5KpsiforCTU Required Working Other: ~JRIGINAL SIGNED BY by order of Approved By D Taylor Seamour3t. , Commissioner the commission Date ~'~ Form 10-401 Rev. 12-01-85 'ORIGINAL Submit In Triplicate BPX Y-01B Sidetrack Summary of Operations: A CTD sidetrack of well Y-01A will be drilled. Specific prep work, (Phase 1) and drilling, (Phase 2) operations are detailed below. /"' Phase 1: Isolate & integrity test inner annulus, (IA). Set whipstock. Mill window if service coil i available. ~"~. Planned for April 29, 2001 _,-~~ · Drift well with dummy whipstock. ~"~ ] · Integrity test IA after displacing to seawater & installing dummy gas lift valves. L~ (/' · Set through tubing whipstock using e-line at approx. 12,030' '~ · Pump cement past the whipstock to P&A the existing perforations. · Mill window with service coil if available. Phase 2: Drill and Complete CTD sidetrack: Planned for May 10, 2001 2-3/8" coil will be used to drill a -2200 foot, 3-3A'' open hole sidetrack, (as per attached plan) and run a solid, cemented & perforated 2-7/8" liner completion. Mud Program: · Phase 1: Seawater · Phase 2: Seawater and FIo-Pro (8.6 - 8.7 ppg) Disposal: · No annular injection on this well. · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 2 7/8", 6.16#, L-80, solid liner be run from 11,125' (TOL) to TD. Liner will be cemented in place with approximately 22bbls (annular volume plus 25% excess in OH) of 15.8ppg class G cement. Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2200 psi. Directional · See attached directional plan · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · An MWD Gamma Ray log will be run over the open hole section. · A MCNL will be run in the cased hole. Hazards H2S was measured at 8 ppm on May 16, 1998. The well-path will cross 4~_~mapped faults. Offset wells indicate there is a high risk of lost circulation along the wellpath. Reservoir Pressure Res. press, is estimated to be 3300 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 2244 psi. TREE: 6" McEvoy WELLHEAD: McEvoy ACTUATOR:6" Otis 13-3/8", 72 ~/ft, L-80, BTRS I 2690 I DV 2583'-- ORIGINAL KOP: 3000 SIDETRACK KOP: t 1,972 MAX ANGLE: 75* ~ 12431'md 4-1/2", 12.6#/ft,13Cr-80 TUBING TUBING ID: 3.958" CAPACITY: 0.01522 BBI_/FT TOP OF 41/2"UNER I 11124 I TOPOF I11232 7" LINER 9-5,8", 47~wft, 111778 L-80, BTRS CUT WINDOW @11970 PERFORATION SUMMARY REF: LOG:SWS TDT/GR 04129/97 SIZE SPF INTERVAL OPEN/SQZ'D 2 718 4 12,524 - 12,528' SQZ 2/13/98 2 7/8 4 12,534 - 12,544' SQZ 2/13/98 2 7/8 6 12,750 - 12,794' Open 8/30/98 2 718 4 12,814 - 12,833' SQZ 2/13/98 2 7/8 6 12,833 - 12,853' Open 5/02/98 2 718 4 12,853 - 12,854' SQZ 2/13/98 2 7/8 12 12,886 - 12,900' Open 2/26/98 2 7/8 4 12,900 - 12,906' Sqz 2/13/98 2 7/8 4 12,918 - 12,928' SQZ 2/13/98 2 7/8 4 12,966 - 12,986' ! SQZ 2/13/98 IA ORIGINAL KB. ELEV = 81.37 SIDETRACK KB ELEV= 76.37 BF. ELEV = 50.69 SSSVLANDING NIPPLE I 2141 (HES 'HXO")( 3.813" ID) (~A~ LIFT MANDRELS CAMCO 4.5" X 1.5" MMG WIRK LATCH 3.958"1D N1 MD(BKB)I 'l~/Dss rev 6/ 307512998 /0 5/ 56~0 I 483~ /58 4/ 7929 16094 /5~ 3/ 9419 I 7001 /52 HES X-NIPPLE (3.813" ID)I 11082 9-5/8" PACKER I 11°921 TIW "HB-BP-T" (3.949"1D) 4.5 NES X-NIPPLE (3.813" ID) 1111 7 XN-NIPPLE (3.725" ID) 11137 XN CTEMD 11 142 WLEG CTEMD I 11153 PBTD I 13162 4.5"12.6 # 13CR -80 NSCT 3.958"1.D. CAP.= .0152 TD I 13246 DATE I REV. BYI 1/22/97 IJLM I 5/5/97 I WRR I 5/21197 IJAM I 2/26/98 IDOW I 5/02/9aI SRS I ~I:~11~8 ~ No,ds ~ COMMENTS SIDETRACK COMPLETION I DOYON 16 CTE ADD PERFS Corrected Misc. Depths per T.Hubble Correct f/sqz ops & add Perfs Add Perfs Add Perf~ PRUDHOE BAY UNIT WELL: Y-01A APl NO: 50-029-20394-01 SEC 27; TN 11W; RGE 13E BP Exploration (Alaska) TREE = MCEVOY WELLHEAD= IVtCE'V OY ACTUATOR= OTIS KOP = 3OO0' '~'×'n'~i~"-; ......... ~'~'@'"~'~'~;~'~ Datum MD = 12528 Datum 'I'V Dss = 8800 SS' I SAFE r~ Y-011 proposed CTD S detracl( 13-3/8" CSG, 72#, L-80, ID=12.347 H 2690' ~J 2141' 1~4-1/2" HES HXO SSSV NIP, ID=3.813"1 GAS LIFT MANDRELS Minimum ID = 3.725" @ 11142' 4-1/2" HES XN NIP. I TOPOF 4-1/2" LNR I'"'~ 11124' I 4-1/2"TBG,12.6#,13CR, 0.0152 bpf,ID=3.958 I""~ 11153' I TOPOF7"LNR I"'~ 11232' 11778' 11082' 11092' 11117' 11137' 11153' I--~4-1/2" HES 'X' NIP, ID=3.813" ] I--~9-5/8" x 4-1/2" TIW HBBP PKR, ID=3.949" I--~ 4-1/2" HES 'X' NIP, ID=3.813" I Id4-1/2" HES 'XN' NIP, ID=3.725 ] I--~4-1/2"WLEG, ID=3.958 I PERFORATION SUMMARY REF LOG: SWS - 'rDT/GR -4/29/97 ANGLE AT TOP PB:~: 17o@ 12524' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-7/8" 4 12524' -12528' S 02/13/98 2-7/8" 4 12524' -12528' O 02/13/98 2-7/8" 6 12534' -12544' S 02/13/98 2-7/8" 4 12534' -12544' O 02/13/98 2-7/8" 6 12750' -12774' O 08/29/98 2-7/8" 4 12774' -12794' O 08/29/98 2-7/8" 12 12833' -12838' O 05/02/98 2-7/8" 4 12838' -12878' S 02/13/98 2-7/8" 4 12838' -12878' S 05/02/98 Existing Y-01A WINDOW- 11970' Y-01BKickoff- 12,030' I 114,235' I--~ 2-7/8" Cemented liner 7" LNR, 29#, L-80, 0.0371 bpf, ID=6.184 I"'~ 12962' 4-1/2" LNR, 12.6#,13CR-80, 0.0152 bpf, ID=3.953 I-'~ 13246' I DATE REV BY COMMENTS 09109/80 ORIGINAL COMPLETION 01/22/97 JLM SIDETRACK COMPLETION 03/04/01 SIS-QAA CONVERTEDTO CANVAS 03/10/01 SIS-MD FINAL PRUDHOE BAY UNIT WELL: Y-01A PERMIT No: 96-1950 APl NO: 50-029-20394-01 Sec. 22, T11 N, R13E BP Exploration (Alaska) SECTION DE ~ ' Sec MD Inc Azi TVD N/S ~ DLeg TFace VSec Target I 12023.6959.30 26.50 8698.12 6385.50 2142.37 0.00 0.00 -6660.51 2 12030.0060.70 27.71 8701.28 6390.36 2144.86 27.71 37.12 -6665.73 3 12250.0070.02 90.52 8801.13 6482.09 2306.49 26.00 96.00 -6784.13 4 12350.0066.87 il&31 8838.50 6459.47 2395.49 26.00 102.00 -6777.31 5 12545.0083.00 129.72 8889.18 6354.08 2550.37 I0.00 36.00 -6700.42 6 12595.0082.59 134.74 8895.45 6320.76 2587.09 I0.00 95.00 -6673.97 7 13165.0085.97 191.96 8957.44 5800.03 2741.92 !0.00 90.00 -6188.05 8 13255.0094.97 191.96 8956.70 5712.08 2723.30 !0.00 0.00 -6098.19 9 13655.0093.81 232.06 8924.78 5380.91 2516.14 !0.00 90.00 -5736.08 !0 14235.00104.73 174.18 8822.97 4880.51 2297.35 !0.00 285.00 -5205.29 WELt,PATH DETAILS Plen~ Y-OI B 5~0292039402 P~n~ Wellp~_h= Y-01A l~eo~ MD: 120.30.00 Vcr~ical Section Origin: SIc~ - 01 (O.00.O.00) Ve~leal Senli~m Angle: 190.00' De Rig: I~h Reference: 2: OI 12/27/1996 00:00 75.02ft REFERENCE INFORMATION Co-onlinat~ (N/E) Reference: Well Centre: Y-OI. Tru~ North Va~leal (TVD) Reference: 2: OI 12/271199600:0075.0 S~'Iic~ (VS) Reference: SIo~ - OI (0.00.0,00) Measured I~lh Reference: 2: OI 12/27/1996 00:00 75.0 Calculation Me~hod: Minimum Curvature Y-01B Proposed CTD Sidetrack Kick Off = 12,030'md TD = 14,235'md Total OH length = 2,205'md Use for plaltni,g purposes Only! ............. Y-36 CY- .......... ........ ....................... 1500 2000 2500 3000 3500 4000 Wcst(-)/Easx(+) [50Oft/iai -7500 -7000 -6500 -6000 -5500 -5000 Vertical Section at 190.00° [50Oft/in] Lm~ 'il A-28 (A-28) H-23A (H-23A) Y-01(Y-01) ' : i Y-01 (Y-01A) Y-36 (Y-36) : ~ Plang9 Y-01B Plan g9 ~ BP Amoco Planning Report- Geographic Company: BP Amoco Date: 4124/2001 Time: 15:32:31 Page: 1 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: Y-01, True North Site: PB Y Pad Vertical (TVD) Reference: 2 ' 01 12/27/1996 00:00 75.0 Well: Y-01 Section (VS) Reference: Well (0.00E,0.00N, 190.00Azi) Wellpath: PianO9 Y-01B Plan: Plan #9 Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Ge# Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: Bggm99 Site: PB Y Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5948541.48 647748.73 Latitude: 70 16 0.041 N Longitude: 148 48 18.991 W North Reference: True Grid Convergence: 1.12 deg Well: Y-01 Y-01 Surface Position: +N/-S 566.12 ft Northing: 5949065.00 ft +El-W-2163.20 ft Easting: 645575.00 ft Position Uncertainty: 0.00 ft Reference Point: +N/-S 566.12 ft Northing: 5949065.00 ff +El-W-2163.20 ft Easting: 645575.00 ft Measured Depth: 26.02 ft Vertical Depth: 26.02 ft Slot Name: 01 Latitude: 70 16 5.606 N Longitude: 148 49 21.958 W Latitude: 70 16 5.606 N Longitude: 148 49 21.958 W Inclination: 0.00 deg Azimuth: 0.00 deg -~'pa th :-- ~a~-,~-~-E~ ...................................................... D rill;d--F'r-o-~-i .................... ~:~i-~- ........................................................... 500292039402 Tie-on Depth: 12030.00 ft Current Datum: 2 · 01 12/27/1996 00:00 Height 75.02 ft Above System Datum: Mean Sea Level Magnetic Data: 3/27/2001 Declination: 26.63 deg Field Strength: 57470 nT Mag Dip Angle: 80.75 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 0.00 0.00 0.00 190.00 Plan: Plan #9 Date Composed: 3/29/2001 Version: 1 Principal: Yes Tied-to: From: Definitive Path Plan Section Information 'i'~'~-~MD:= .i; ;'incl. :: ii'.' .Azim' :...:. '.:.. ::TyD: ~' .. ~:i +N/-S .i.' +El.W:: .: .. i~'~'i~'":~ui'ld.. ::~ · ":..: ff' !~:;:::'deg:'/:.::.:.deg::':.' .... : .ff'~:: .:..::'if[::..~:'..' ... ff.. ~.:" : d.eg/iOOff'degiioOffdlegtl~OOff:.: deg:..:..: .:.". '..:. ,.' ......... '...:_._: ................ L: ......... '...':- .............. :..=~ ....... :._.= _:.~...:..~ ......... ':....L:~.~....-=:__.,_~:.'.-..-._._'.. _.L:.......:..~,..__.~....~... _;~.._~ ._~= ............... '=.'.'-- ....... 12023.69 59.30 26.50 8698.12 6385.50 2142.37 0.00 0.00 0.00 0.00 12030.00 60.70 27.71 8701.28 6390.36 2144.86 27.71 22.19 19.18 37.12 12250.00 70.02 90.52 8801.13 6482.09 2306.49 26.00 4.24 28.55 96.00 12350.00 66.87 118.31 8838.50 6459.47 2395.49 26.00 -3.15 27.79 102.00 12545.00 83.00 129.72 8889.18 6354.08 2550.37 10.00 8.27 5.85 36.00 12595.00 82.59 134.74 8895.45 6320.76 2587.09 10.00 -0.82 10.05 95.00 13165.00 85.97 191.96 8957.44 5800.03 2741.92 10.00 0.59 10.04 90.00 13255.00 94.97 191.96 8956.70 5712.08 2723.30 10.00 10.00 0.00 0.00 13655.00 93.81 232.06 8924.78 5380.91 2516.14 10.00 -0.29 10.03 90.00 14235.00 104.73 174.18 8822.97 4880.51 2297.35 10.00 1.88 -9.98 285.00 Section 1 : Start DLS 27.71 TFO 37.12 · i:: :'::MD=.= :';. ~:In¢l:: .'::.::': Azim:: ~:::' .:'..:iTYD=:..':.'i · :.+Ni:S :... ':! ::+E/:W .... ::. 'VS.:.. ".: .:DLS ;:.i' ;". 'BUiid:' i. ~:::.Tur',:i i' :. ·: ~Fo:...; ::'i ';::. :' :: :. "=:. ::::.:': :': ,:." .:.' :i:.'ff .. ;:...::deg:::. ~:' :=.deg:": · '~ :" .:. ft :: ::' " :". :::~.."i'ff',:' :..:': ::". ~ ft :=: ":" ~:fti: :": d6g!i00ff.:deg)!00ff'deg/~100ft ' i'"deg':'"'=':' :":':."::::::' '. ~: :.'""'~:' 12030.00 60.70 27.71 8701.28 6390.36 2144.86 -6665.73 27.71 22.19 19.18 37.12 Section 2: Start DLS 26.00 TFO 96.00 · .. ff'..:'.'.:i::.':,:;deg: ..'.;.; · deg· .: : ':': '. iff.::......~', ft:.:. ::'.: ::: ..: ft ~ . '.:.. :.::ff':':'": deg/100ft;:.degll00ft::.deg~100ff.'" deg :; .... · ~.:!: :.i" ' ;:"" ' ........................................... · ......................................................... : ..... £.-:_:._...'L=.' ............... - ............. ,&'.:_...:..:-_...L_ ............................. -- ............ ~......= ...... ' ............... :_'._...' ........... :_%: ............. L._=~ ........................................... :._~.: ........... ~_..__._: ........ ~_ ..... 12040.00 60.46 30.68 8706.19 6397.96 2149.11 -6673.95 26.00 -2.39 29.72 96.00 12060.00 60.18 36.66 8716.10 6412.42 2158.73 -6689.86 26.00 -1.39 29.89 94.54 12080.00 60.18 42.65 8726.05 6425.77 2169.80 -6704.93 26.00 -0.04 29.97 91.58 BP Amoco Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y-01 Wellpath: Plang9 Y-01B Date: 4/24/2001 Time: 15:32:31 Co-ordinate(NE) Reference: Well: Y-01, True North Vertical (TVD) Reference: 2: 01 12/2711996 00:00 75.0 Section (VS) Reference: Well (0,00E,0.00N,190~00Azi) Plan: Plan g9 Page: Section 2: Start DLS 26.00 TFO 96.00 MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg 12100.00 60.44 48.63 8735.97 6437.90 2182.22 -6719.03 26.00 1.31 29.90 88.60 12120.00 60.97 54.57 8745.76 6448.73 2195.88 -6732.07 26.00 2.64 29.66 85.63 12140.00 61.75 60.42 8755.35 6458.15 2210.67 -6743.92 26.00 3.93 29.29 82.73 12160.00 62.78 66.18 8764.67 6466.10 2226.48 -6754.49 26.00 5.15 28.79 79.92 12180.00 64.04 71.82 8773.62 6472.50 2243.17 -6763.69 26.00 6.31 28.21 77.23 12200.00 65.52 77.34 8782.15 6477.30 2260.60 -6771.44 26.00 7.38 27.56 74.71 12220.00 67.19 82.71 8790.18 6480.47 2278.64 -6777.69 26.00 8.35 26.88 72.36 12240.00 69.04 87.95 8797.64 6481.97 2297.13 -6782.39 26.00 9.23 26.20 70.20 12250.00 70.02 90.52 8801.13 6482.09 2306.49 -6764.13 26.00 9.83 25.69 68.24 Section 3: Start DLS 26.00 TFO 102.00 :... 12260.00 12280.00 12300.00 12320.00 12340.00 12350.00 · Incl.':';:. :.AzimI ..' :TVD'" .+N/-S ".' +E/-W' · :i 'VS .... DLS '.'. BUild'... Turn: :"TFO.. : · ' deg'~ ...:.~. ':'deg .!: .: :' ... :..~'.. :: .ff :'i: .....' .ff. '. '~!: ..': .. '.' fi:' '. ~:~ . "...~'ff ' .~.. !~'d.eg/100ff degi!00ft'=deg/!00ft .' .deg... "' 69,50 93,24 8804,59 6481,79 2315,87 -6785,46 26,00 -5,20 27.15 102.00 68.59 98.72 8811.75 6479,84 2334.44 -6786.77 26.00 -4.55 27.41 101,06 67,86 104,26 8819,18 6476,15 2352.63 -6786,29 26,00 -3,65 27,72 99.10 67,32 109.86 8826,81 6470,73 2370,29 -6784.02 26,00 -2,71 27,97 97,04 66,97 115,49 8834,58 6463.63 2387.29 -6779.98 26.00 -1.73 28.15 94.90 66,87 118,31 8838,50 6459.47 2395,49 -6777,31 26.00 -0.98 28,24 92,72 Section 4 Start DLS 10.00 TFO 36.00 12400,00 70,95 121,42 8856,50 6436,23 2435,92 -6761,44 10.00 8.15 6.21 36,00 12450,00 75.07 124,38 8871,11 6410,25 2476,05 -6742,83 10,00 8,25 5,91' 34,88 12500,00 79,23 127.22 8882,23 6381,74 2515,57 -6721.61 10.00 8,32 5,69 34,02 12545,00 83,00 129,72 8889,18 6354,08 2550,37 -6700,42 10,00 8,37 5,54 33,38 Section 5: Start DLS 10.00 TFO 95.00 ::/~i'::' :~ MD .:: ;' :..::: .i ,..inc[ .:'; :.:.i ! .=: ;i AZlnl.= :~. ;: ;; := i: ::: ::.'i :~ TyD.::: :: :::. :.: =! +N/£S;':: ! :;' i~ .~;.+E~:W !';"; ? .::: :::' ?'i¥S:= ::':. ::= .: !.;' ":DLs :. :; .: .; !Build i; ! ::::· ::.:' ~.'i~ui~n ii! il .: :.: :~: :i. ::TFO:.; .... · :. ::'.".: i ;..::if~" ::; ::" :. '.:'.:: d~g :;: i' :': .,;' ::deg:?.,:,. ;.!: i :!: .:: i.:::' i..;~t;::i;: :.':~ i: ~i:":'; :"fi! :.:' ;: i'..i'.;~ i .:fi":';,;~ ::;'i: :. :;.:.i.;;ff '!; ::'.'; .~.,:,deg!].OOff;deg/l!OOft':d'egilO~ :~.'~: ;.~d'~g ....... ..... .... ...... °o .... ? .... o.o4 ..... 12595.00 82.59 134.74 8895.45 6320.76 2587.09 -6673.97 10.00 -0.81 10.05 94.94 Section 6: Start DLS 10.00 TFO 90.00 12600.00 82,59 135,24 8896,10 6317.25 2590,59 -6671,13 10,00 0,01 10,08 90,00 12650,00 82,62 140,28 8902,54 6280,55 2623,91 -6640,78 10.00 0.07 10,08 89,93 12700.00 82.71 145.32 8908,92 6241,06 2653.88 -6607.09 10.00 0.18 10.08 89.29 12750,00 82,86 150,36 8915,21 6199,08 2680,27 -6570,33 10,00 0,29 10,08 88,64 12800.00 83,06 155.40 8921,34 6154,93 2702,89 -6530,77 10,00 0,40 10.07 88.01 12850,00 83.31 160.43 8927.27 6108,94 2721.55 -6488.73 10.00 0,51 10.06 87.39 12900,00 83,62 165,45 8932,97 6061,47 2736,12 -6444.50 10,00 0,61 10,05 86,79 12950.00 83,97 170,47 8938,37 6012.87 2746,49 -6398,44 10,00 0,71 10,03 86,22 13000.00 84.37 175.48 8943.45 5963.52 2752.57 -6350.90 10.00 0.80 10,02 85.68 13050,00 84,81 180,48 8948,17 5913,79 2754,33 -6302,23 10,00 0,88 10,01 85,17 13100,00 85,29 185,47 8952,48 5864,06 2751,74 -6252,81 10,00 0,96 9,99 84,70 13150,00 85,81 190,46 8956,36 5814,71 2744,83 -6203,00 10.00 1,03 9,98 84.27 13165.00 85,97 191,96 8957,44 5800,03 2741.92 -6188,05 10,00 1,08 9,97 83,88 Section 7: Start DLS 10.00 TFO 0.00 13200,00 89.47 191.96 8958.83 5765.82 2734.68 -6153.10 10.00 10.00 0.00 0.00 13250,00 94.47 191,96 8957,11 5716,95 2724,33 -6103,17 10,00 10,00 0.00 0.00 13255,00 94.97 191,96 8956,70 5712,08 2723.30 -6098,19 10.00 10,00 0,00 0,00 BP Amoco Planning Report- Geographic Company: BP Amoco Date: 4/24/2001 Time: 15:32:31 Page: Field: Pmdhoe Bay Co-ordinate(NE) Reference: Well: Y-01, True North Site: PB Y Pad Vertical (TVD) Reference: 2: 01 12/27/1996 00:00 75.0 Well: Y-01 Section (VS)Reference: Well (0,00E,0.00N,190,00Azi) .__Wei~_o..?_:_.~!.a_n~?_~ ..................................................... r_~.._ ...... . ............................... .~_~.~.__~._ ......... , .................................. Section 8: Start DLS 10.00 TFO 90.00 MD lncl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/100ft deg/100ft :deg/100ft deg 13300.00 94.96 196.47 8952.80 5668.63 2712.29 -6053.50 10.00 -0.03 10.04 90.00 13350.00 94.90 201.49 8948.50 5621.54 2696.09 -6004.31 10.00 -0.11 10.04 90.39 13400.00 94.81 206.51 8944.27 5576.04 2675.83 -5955.98 10.00 -0.18 10.03 90.82 13450.00 94.69 211.53 8940.12 5532.48 2651.67 -5908.89 10.00 -0.25 10.03 91.25 13500.00 94.52 216.54 8936.11 5491.19 2623.78 -5863.39 10.00 -0.33 10.03 91.66 13550.00 94.33 221.55 8932.25 5452.49 2592.39 -5819.82 10.00 -0.39 10.02 92.07 13600.00 94.10 226.56 8928.58 5416.67 2557.73 -5778.52 10.00 -0.46 10.02 92.45 13650.00 93.83 231.56 8925.12 5383.99 2520.06 -5739.80 10.00 -0.52 10.01 92.82 13655.00 93.81 232.06 8924.78 5380.91 2516.14 -5736.08 10.00 -0.56 10.01 93.17 Section 9: Start DLS 10.00 TFO 285.00 · 'MD:: : : Incl· · ' "Azim': .' ..... .TVD'" ~ :.+N/rS'." ~'.'+E/-W': ..... 'vS..... DLS' ' 'BUild · '.Turn::.'.' ' ":TFO:" ·" · .:" · .... .", '. · ' ..ff ' ·" . deg ....: 'deg:. :..:...~ · .. ' ft ::: '".. ':..::' .. ft. ".:/ ' ff .... . i.'i.:' ::fi:...:. :..'.'deg/100ff deg/100ftdeg/100ft ' .'. deg :=' .:...: ...:. ":.. ' ' :. 13700.00 94.96 227,70 8921,34 5352,00 2481,83 -5701,66 10,00 2.56 -9,69 -75,00 13750,00 96,21 222.84 8916.48 5317.00 2446,49 -5661,05 10,00 2,49 -9,73 -75,33 13800,00 97,41 217,95 8910,55 5279,20 2414,33 -5618,24 10,00 2,40 -9,78 -75,81 13850,00 98,56 213,03 8903,60 5238,90 2385.59 -5573,56 10.00 2,30 -9,83 -76,39 13900.00 99.64 208,09 8895,69 5196,40 2360,49 -5527,35 10,00 2.17 -9.89 -77,07 13950.00 100,66 203,12 8886,87 5152,03 2339,22 -5479,96 10,00 2.03 -9,95 -77,85 14000.00 101.59 198,11 8877,22 5106,13 2321,95 -5431,76 10,00 1,87 -10,01 -78,73 14050,00 102,44 193,07 8866,80 5059.05 2308.81 -5383,11 10,00 1,70 -10,08 -79,70 14100,00 103,20 188,00 8855,69 5011.13 2299.89 -5334.37 10,00 1,51 -10,14 -80,75 14150,00 103,86 182,91 8843,99 4962,76 2295,27 -5285.93 10.00 1,31 -10,20 -81,87 14200,00 104,41 177,78 8831,78 4914,29 2294,98 -5238,15 10,00 1,10 -10,25 -83,06 14235.00 104.73 174.18 8822.97 4880.51 2297.35 -5205.29 10.00 0.91 -10.29 -84.32 Survey ~' ;: :: '~. :.' .:: ~ '.i;.i ": :' .:=' "~ ;::' :.;" .' ::'." .: ~..' '.: ii'?/:~: :~:' :=::::: '='!: i: i'::::: ~;;' .: ';'::~ ':.' .::!i ;:. '~: :: .::i~ :;: ;;..:..ii i' !'~. .?./:::.'i :~: ;: .;~/:'i':'~ .i :: ';' .! ..i '.;;; .i :'.M~P.;; :.;:' !' '::; ::':;' ;.= .;i ~: ! Map:... i' :.!';'? ~·~:: i~afltade~ !~ i:·/:·~,~,?Eongitud~: ~/~; ~: :~.;::.::! ;MD;~ :.~ i ;.;'IncI !' ::~:'.;: :: ;.,! i:Azi:~'. ! :. ~; .i= ':;. :..~ :=:TVD' !':: i'::; '= '~N/~S.: ;' ~:i::':; ;:.+Ei~,W~'! ~;::i:i.::'N6r~h.~i~g':::.:=. i~ :,=.E%flng.' =.:.:.' :: 'De~"Min.:~:=:,.! Si~ ?:', :.';:.:; ~: :.i:Deg Min: :Sec ~.i .i '.:::~'i 12023,69 59,30 26,50 8698,12 6385,50 2142.37 5955490.25 647593,32 70 17 8,404 N 148 48 19,545W 12030.00 60,70 27,71 8701,28 6390,36 2144,86 5955495,16 647595,72 70 17 8,452 N 148 48 19,472W 12040.00 60,46 30,68 8706.19 6397.96 2149.11 5955502.84 647599.82 70 17 8.527 N 148 48 19.348W 12060,00 60,18 36.66 8716,10 6412,42 2158,73 5955517.47 647609,16 70 17 8,669 N 148 48 19,068W 12080,00 60,18 42,65 8726,05 6425,77 2169,80 5955531,03 647619,97 70 17 8,800 N 148 48 18.745W 12100,00 60,44 48,63 8735.97 6437,90 2182,22 5955543,41 647632,14 70 17 8.919 N 148 48 18,383W 12120,00 60,97 54,57 8745,76 6448,73 2195,88 5955554,50 647645,59 70 17 9,026 N 148 48 17,985W 12140.00 61.75 60.42 8755.35 6458,15 2210.67 5955564.20 647660.20 70 17 9.118 N 148 48 17,554W 12160.00 62,78 66,18 8764,67 6466,t0 2226,48 5955572,45 647675,85 70 17 9,196 N 148 48 17,094W 12180,00 64,04 71,82 8773.62 6472.50 2243.17 5955579,17 647692.41 70 17 9,259 N 148 48 16.607W 12200.00 65,52 77,34 8782.15 6477,30 2260,60 5955584,31 647709,75 70 17 9,307 N 148 48 16,099W 12220,00 67,19 82,71 8790,18 6480,47 2278,64 5955587,83 647727,72 70 17 9,338 N 148 48 15,574W 12240,00 69.04 87.95 8797,64 6481.97 2297.13 5955589.69 647746.17 70 17 9.352 N 148 48 15,035W 12250,00 70,02 90.52 8801,13 6482.09 2306.49 5955589.99 647755,53 70 17 9,354 N 148 48 14,762W 12260.00 69,50 93,24 8804,59 6481,79 2315,87 5955589,87 647764,91 70 17 9,350 N 148 48 14,489W 12280.00 68,59 98,72 8811,75 6479,84 2334,44 5955588,28 647783,51 70 17 9,331 N 148 48 13,948W 12300.00 67,86 104,26 8819,18 6476,15 2352,63 5955584,94 647801,77 70 17 9,295 N 148 48 13,419W 12320,00 67.32 109.86 8826,81 6470,73 2370.29 5955579,86 647819,54 70 17 9,242 N 148 48 12,904W 12340.00 66,97 115,49 8834,58 6463,63 2387,29 5955573,09 647836,67 70 17 9.172 N 148 48 12,409W 12350.00 66,87 118,31 8838,50 6459,47 2395,49 5955569,09 647844,95 70 17 9,131N 148 48 12,170W 12400.00 70.95 121.42 8856.50 6436.23 2435.92 5955546.64 647885.82 70 17 8.902 N 148 48 10.992W 12450.00 75.07 124.38 8871.11 6410.25 2476.05 5955521.45 647926.44 70 17 8.646 N 148 48 9.823W 12500.00 79.23 127.22 8882.23 6381.74 2515.57 5955493.71 647966.50 70 17 8.366 N 148 48 8.672W 12545.00 83.00 129.72 8889.18 6354.08 2550.37 5955466.73 648001.82 70 17 8.094 N 148 48 7.659W 12550.00 82.95 130.22 8889.79 6350.90 2554.17 5955463.62 648005.68 70 17 8.062 N 148 48 7.548W 12595.00 82.59 134.74 8895,45 6320.76 2587.09 5955434.13 648039.18 70 17 7.766 N 148 48 6,590W 12600,00 82,59 135.24 8896,10 6317.25 2590.59 5955430.69 648042,75 70 17 7,731N 148 48 6,487W BP Amoco Planning Report- Geographic Company: BPAmoco Date: 4/24/2001 Time: 15:32:31 Page: 4 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: Y-01, True North Site: PB Y Pad Vertical (TVD) Reference: 2: 01 12/27/1996 00:00 75.0 Well: Y-01 Section (VS) Reference: Well (0.00E,0.00N,190.00Azi) Wellpath: PianO9 Y-01B Plan: Plan #9 Survey Map Map <~ Latitude --> <--- Longitude --> MD Incl Azim TVD +N/-S +EI-W Northing Easting Deg'Min Sec Deg Min Sec ft deg deg ff ff ff ff ff 12650.00 82.62 140.28 8902.54 6280.55 2623.91 5955394.64 648076.77 70 17 7.370 N 148 48 5.517W 12700.00 82.71 145.32 8908.92 6241.06 2653.88 5955355.74 648107.49 70 17 6.982 N 148 48 4.644W 12750.00 82.86 150.36 8915.21 6199.08 2680.27 5955314.28 648134.69 70 17 6.569 N 148 48 3.876W 12800.00 83.06 155.40 8921.34 6154.93 2702.89 5955270.58 648158.15 70 17 6.135 N 148 48 3.218W 12850.00 83.31 160.43 8927.27 6108.94 2721.55 5955224.96 648177.70 70 17 5.682 N 148 48 2.675W 12900.00 83.62 165.45 8932.97 6061.47 2736.12 5955177.79 648193.18 70 17 5.215 N 148 48 2.251W 12950.00 83.97 170.47 8938.37 6012.87 2746.49 5955129.40 648204.49 70 17 4.737 N 148 48 1.949W 13000.00 84.37 175.48 8943.45 5963.52 2752.57 5955080.18 648211.52 70 17 4.252 N 148 48 1.772W 13050.00 84.81 180.48 8948.17 5913.79 2754.33 5955030.50 648214.24 70 17 3.763 N 148 48 1.722W 13100.00 85.29 185.47 8952.48 5864.06 2751.74 5954980.73 648212.62 70 17 3.274 N 148 48 1.798W 13150.00 85.81 190.46 8956.36 5814.71 2744.83 5954931.26 648206.66 70 17 2.788 N 148 48 2.000W 13165.00 85.97 191.96 8957.44 5800.03 2741.92 5954916.53 648204.04 70 17 2.644 N 148 48 2.084W 13200.00 89.47 191.96 8958.83 5765.82 2734.68 5954882.19 648197.46 70 17 2.308 N 148 48 2.296W 13250.00 94.47 191.96 8957.11 5716.95 2724.33 5954833.13 648188.06 70 17 1.827 N 148 48 2.598W 13255.00 94.97 191.96 8956.70 5712.08 2723.30 5954828.24 648187.12 70 17 1.779 N 148 48 2.628W 13300.00 94.96 196.47 8952.80 5668.63 2712.29 5954784.59 648176.95 70 17 1.352 N 148 48 2.949W 13350.00 94.90 201.49 8948.50 5621.54 2696.09 5954737.20 648161.67 70 17 0.889 N 148 48 3.421W 13400.00 94.81 206.51 8944.27 5576.04 2675.83 5954691.32 648142.30 70 17 0.441N 148 48 4.012W 13450.00 94.69 211.53 8940.12 5532.48 2651.67 5954647.31 648118.98 70 17 0.013 N 148 48 4.716W 13500.00 94.52 216.54 8936.11 5491.19 2623.78 5954605.49 648091.90 70 16 59.607 N 148 48 5.529W 13550.00 94.33 221.55 8932.25 5452.49 2592.39 5954566.19 648061.27 70 16 59.227 N 148 48 6.444W 13600.00 94.10 226.56 8928.58 5416.67 2557.73 5954529.70 648027.31 70 16 58.874 N 148 48 7.454W 13650.00 93.83 231.56 8925.12 5383.99 2520.06 5954496.31 647990.28 70 16 58.553 N 148 48 8.551W 13655.00 93.81 232.06 8924.78 5380.91 2516.14 5954493.15 647986.42 70 16 58.523 N 148 48 8.666W 13700.00 94.96 227.70 8921.34 5352.00 2481.83 5954463.59 647952.68 70 16 58.239 N 148 48 9.665W 13750.00 96.21 222.84 8916.48 5317.00 2446.49 5954427.91 647918.03 70 16 57.894 N 148 48 10.695W 13800.00 97.41 217.95 8910.55 5279.20 2414.33 5954389.50 647886.60 70 16 57.523 N 148 48 11.632W 13850.00 98.56 213.03 8903.60 5238.90 2385.59 5954348.65 647858.65 70 16 57.127 N 148 48 12.470W 13900.00 99.64 208.09 8895.69 5196.40 2360.49 5954305.68 647834.38 70 16 56.709 N 148 48 13.201W 13950.00 100.66 203.12 8886.87 5152.03 2339.22 5954260.91 647813.98 70 16 56.272 N 148 48 13.821W 14000.00 101.59 198.11 8877.22 5106.13 2321.95 5954214.69 647797.60 70 16 55.821N 148 48 14.324W 14050.00 102.44 193.07 8866.80 5059.05 2308.81 5954167.36 647785.37 70 16 55.358 N 148 48 14.708W 14100.00 103,20 188.00 8855.69 5011.13 2299.89 5954119.29 647777.38 70 16 54.887 N 148 48 14.968W 14150.00 103.86 182.91 8843.99 4962.76 2295.27 5954070.84 647773.70 70 16 54.411N 148 48 15.103W 14200.00 104.41 177.78 8831.78 4914.29 2294.98 5954022.38 647774.34 70 16 53.934 N 148 48 15.112W 14235.00 104.73 174.18 8822.97 4880.51 2297.35 5953988.65 647777.37 70 16 53.602 N 148 48 15.043W ("' CDR1 Drilling Wellhead De~'-" 21.18' 17. 19.03' Rig Floor 5.02' ~o'~ 26' , . Dual T.O.T. 5,000 psi W.P. R_~n Type Dual Gate BOPE 7.54' ~ CT Injector Head Otis Q.C. thread half Traveling plate 5-1/2" lubricator Jacking Frame 4----'-Top Stationary Plate Annular BOP (Hydril),7-1/16" ID Annular BOP (Hydril),7-1/16" ID Top blind / shearI Bottom 2 3/8" pipesI Kill Line ~ I Top 2 3/8" pipe / slips I Btm 2 7/8" pipe/slips Manual Master Valve -- Tubing Hanger 9-5/8" Annulus 0.66' I Rig Matt Ground Level 13-3/8" Annulus H .!. 8 4 3 5 7 o~,,o, oo,.4a~7 VENDOR ALASKAO I LA O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 012(~01· C½012901R 100. O0 100. O0 PYMT :OMMENTS: Peri,it To Drill :ee HANDL NC INST' S/H - Terri Hubb [e X4&28 PAY DATE -ANCHORAOE-' '- AK 99501 WELL PERMIT CHECKLIST COMPANY ,~,~ FIELD & POOL ~'~,~,~,/,5'~;:3 INIT CLASS WELL NAME ADMINISTRATION II APPR DATE, 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available, in drilling unit ............ 8. If deviated, is wellbore plat included ............. ... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit canbe issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... .DATE 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling .fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to .~(~(~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown... ........ 29. Is presence of H2S gas probable ................. GEOLOGY ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will containwaste in a suitable receiving zonei ....... APPR DATE (B) will not contaminate freshwater; or cause drilling waste... to surface; PROGRAM: exp GEOL AREA ~c~ .~.~_.) UNIT# N N N N N N N. N N .. N N N N Y Y N? N dev ~ redrll ~ serv ~ wellbore seg. ann. disposal para req ~ //~'v"' d ON/OFF SHORE 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N 31. Data presented on potential overpressure zones ....... Yv/~1/~ 32. Seismic analysis of shallow gas zones ............. /~ ;~t' Seabed condition survey (if off-shore) ............. · Contact name/phone for weekly progress reports [exploratory onl_~ Y N (C) will not impair mechanical integrity of the well used for disposal; Y' N (D) will not damage producing formation or impair recovery from a Y N/ . pool; and .. (E) will not circumvent 2.0 AAC 25.252 or 20 AAC 25.412. Y N . . GEOLOGY: ENGINEERING:. ' UIC/Annular COMMISSION: , Comments/Instructions: c:~nsoffice\wordian~diana\checklist (rev. 111011/00) O Z O ri1