Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-120• • ao~-~a~ CD2-33B Details ~, v ~.ccc CG.S~ ~-~ Sic ~ ~ ~ ~~~ -~~ ~~o~-~~~~ ~'P ~~~~ APR ~ 9 2008 PHILLIPS PHILLIPS ALASKA INC. Page 1 of 1 ' ' Casing Report Legal Well Name: CD2-33 Spud Date: 6/29/2001 Common Well Name: CD2-33 Report #: 1 Report Date: 7/14/2001 Event Name: ROT -DRILLING Start: 6/28/2001 End: General Information String Type: Surface Casing Permanent Datum: Rotary Kelly Bushing Hole Size: 12.250 (in) Hole TMD: 5,838.0 (ft) Hole TVD: 3,581.0 (ft) KB-Datum: 52.00 (ft) Water TMD: (ft) Str Wt on Slips: (Ibs) Ground Level: 15.50 (ft) CF Elevation: (ft) Liner Overlap: (ft) Max Hole Angle: 76.00 (°) Circ Hours: (hr) Mud Lost: (bbl) KB to Cutoff: 36.95 (ft) Days From Spud: 7.80 (days) Casing Flange / Wellhead Manufacturer: FMC Model: Unihead Top Hub/Flange: 11.000 (in) / 5,000 (psi) Hanger Model: Packoff Model: BTM Hub/Flange: (in) / (psi) Actual TMD Set: 5,824.35 (ft) Integral Casing Detail _ __ - Item Size i Wei ht Grade _- ~ -~ --~ Dnft Threads ~ ~ g __ JTS Len th To MU Tor 'THD Manufacturer f ~ ~ _ - _~ _~ ~ Comp. Name ~ Model Cond. Max OD Min ID (Iblft) ~ (in.) ( ) ( t) (ft) (ft-Ibf) ~) ~ (in) FMC Gen V Hanger 9.625 1 2.27 36.95 Casing 9.625 40.00 L-80 8.679 BTC 24 974.90 39.22 NEW 8.835 9 5/8" 40# L-80 Port Collar 9.625 1 2.98 1,014.12 EW TAM Port Collar Casing 9.625 40.00 L-80 8.679 BTC 116 4,728.08 1,017.10 NEW 8.835 9 5/8" 40# L-80 Float Collar 9.625 1 1.54 5,745.18 Y DAVIS LYNCH NEW Fbat Collar Casing 9.625 40.00 L-80 8.679 BTC 2 75.88 5,746.72 Y EW 8.835 9 5/8" 40# L-80 Float Shoe 9.625 1 1.75 5,822.60 Y DAVIS LYNCH NEW Float Shoe Non-Integral Casing Accessories - _. _ _- Accessory ~- Manufacture _ - I - - - - _ - _ r Number ~ Spacing _ _ _ __ Interval J How Fixed _- _._ (ft) ~ Top (ft) Bottom (ft) Bowspring Centralizer 2 5,815.0 5,819,0 Over L.C. Bowspring Centralizer 13 5,214.0 5,703.0 OverCollar Remarks Casing had to be washed to bottom from 1540' to TD • • Printed: 9/27/2001 2:17:35 PM I~ PHILLIPS PHILLIPS ALASKA INC. Page 1 of 2 ' ' Cementing Report Legal Well Name: CD2-33 Spud Date: 6/29/2001 Common Well Name: CD2-33 Report #: 1 Report Date: 7/15/2001 Event Name: ROT -DRILLING Start: 6/28/2001 End: Cement Job Type: Primary Primate _ S ueeze __ Open Hole - - S ueeze Casing Plug -__ Hole Size: 12.250 (in) Hole Size: Hole Size: Hole Size: TMD Set: 5,824 (ft) SO TMD: (ft) TMD Set: Top Set: (ft) Date Set: 7/14/2001 SO Date: Date Set: BTM set: (ft) Csg Type: Surface Casing SO Type: Csg Type: Plug Date: Csg Size: 9.625 (in.) SO TMD: Plug Type: SO Date: Drilled Out: Cmtd. Csg: Surface Casing Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Co: Dowell Schlumberger Cementer: Pipe Movement: Reciprocating Pipe Movement Rot Time Start: Time End: RPM: Init Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf) Rec Time Start:: Time End: SPM: Stroke Length: (ft) Drag Up: (Ibs) Drag Down: (Ibs) Stage No: 1 of 1 Type: Cement Casing Start Mix Cmt: 21:30 Disp Avg Rate: 6.00 (bbl/min) Returns: Volume Excess %: 300.00 Start Slurry Displ : Disp Max Rate: 6.00 (bbl/min) Total Mud Lost: (bbl) Meas. From: Start Displ: 01:30 Bump Plug: Y Cmt Vol to Surf: 475.00 (bbl) --.~ Time Circ Prior End Pumping: 03:00 Press Prior: 1,150 (psi) To Cementing: 3.00 End Pump Date: 7/15/2001 Press Bumped: 1,700 (psi) Ann Flow After: N Mud Circ Rate: 315 (gpm) Top Plug: Y Press Held: 10 (min) Mixing Method: Mud Circ Press: 450 {psi) Bottom Piug: Y Float Held: Y Density Meas By: Mud Data Type: Spud Mud Density: 10.1 (ppg) Visc: 84 (s/qt) PV/YP: 24 (cp)/24 (Ib/100ft~) Gels 10 sec: 6 (Ib/100ft2) Gels 10 min: 20 (Ib/100ftZ) Bottom Hole Circulating Temperature: (°F) Bottom Hole Static Temperature: (°F) Displacement Fluid Type:Mud Density: 10.1 (ppg) Volume: 435.00 (bbl) Stage No: 1 Slurry No: 1 of 2 Slurry Data Fluid Type: Lead Slurry Descripti on: ASLite Class: G Purpose: FILLER CEM Slurry Interval: 37.00 (ft) To: 3,000.00 (ft) Cmt Vol: 731.0 (bbl) Density: 10.70 (ppg) Yield: 4.44 (ft'/sk) Mix Water: (bbl) Water Source: Slurry Vo1924 (sk) Water Vol:448.0 (bbl) Other Vol: Q Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) (psi) Free Water: (%) Temperature: (°F) Compressive Strength 2: (°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: (°F) Printed: 9/27/2001 2:32:31 PM • • PHILLIPS PHILLIPS ALASKA INC. Page 2 of 2 ~ ~ Cementing Report Legal Well Name: GD2-33 Spud Date: 6/29/2001 Common Well Name: CD2-33 Report #: 1 Report Date: 7/15/2001 Event Name: ROT -DRILLING Start: 6/28/2001 End: Stage No: 1 Slurry No: 1 of 2 -Additives Trade Narne Type Concentration Units T Liquid Conc. 1 Units D053 Thixotrop 30.0 D046 Detoam 0.6 D079 Extender 1.5 S001 Accelerator 1.5 D124 Extender 50.0 D044 Accelerator 9.0 Stage No: 1 Slurry No: 2 of 2 Slurry Data Fluid Type: TAIL Description: Class: G Purpose: SHOE INTEG Slurry Interval: 3,000.00 (ft)T o: 5,824.00 (ft) Cmt Vol: 250.0 (bbl) Density: 15.80 (ppg) Yield: 1.17 (ft'Isk) Mix Water: (bbl) Water Source: Slurry Vo1:1,200 (sk) Water Vo1:145.0 (bbl) Other Vol: Q .~~ Foam Job: N Test Data Time Temp Pressure Thickening Time: Temperature: (°F) Compressive Strength 1: (°F) (psi) Free Water: (%) Temperature: (°F) Compressive Strength 2: (°F) (psi) Fluid Loss: (cc) Temperature: (°F) Fluid Loss Pressure: (°F) Stage No: 1 Slurry No: 2 of 2 -Additives Trade Name I Type _ _ Concentration Units ~ Liquid Conc. ~ Units D046 Defoam 0.2 D065 Dispersant 0.3 °lo S001 Accelerator 1.0 D167 Fluid Loss 0.3 Casing Test Shoe Test Liner Top Test Test Press: 2,500 (psi) Pressure: 14.00 (ppge) Liner Lap: For: 30 (min) Tool: N Pos Test: (ppge) Tool: N Cement Found between Open Hole: 34 (ft) Neg Test: (ppge) Tool: N Shoe and Collar: Y Hrs Before Test: Hrs Before Test: Cement Found on Tool: N Log/Survey Evacuation Interpretation Summary CBL Run: N Cement Top: (ft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: N Cet Run: N Job Rating: Bond Quality: If Unsuccessful Detection Indicator: Temp Survey: N Remedial Cementing Required: N Hrs Prior to Log: Number of Remedial Squeezes: Printed: 9/27/2001 2:32:31 PM • • PHILLIPS Page 1 of 1 Phillips Alaska, Inc. ~ ~ Daily Drilling Report WELL NAME JOB NUMBER EVENT CODE 24 HRS PROG TMD TVD DFS REPT NO. DATE CD2-336 ODR 5,838.0 3,581.0 8.80 18 7/15/2001 SUPERVISOR RIG NAME & NO. FIELD NAME / OCS NO. AUTH MD DAILY TANG CUM. TANG Micke !Dale Do on 19 AI ine 0.00 0.00 CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY IN7 W/O MUD CUM INTANG W/MUD Pickin u 5" drill i e 0.00 0.00 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST W/ MUD Finish PU drill i e, Test BOP, Tri in w/ BHA to drill out 7/15/2001 109,206 2,269,637 LITHOLOGY JAR HRS OF SERVICE BHA HRS SINCE INSP LEAKOFF AFE AUTH. ASD007 LAST SURVEY: DATE TMD INC AZIM LAST CASING NEXT CASING LAST BOP PRES TEST 7/11/2001 5,777.00 76.140 249.910 9.625 in 5,824.0 ft 7.000 in ft CUM COST CO 0.00 T L 0.00 I 9 PP ~- DENSITY(PP9) CD ~ MUD DAT~ DAILY I p ~ - L - 1 _ __ Ca H2S LIME ~ ES FV PV/YP GELS WL/HTHP FC/T.SOL OILIWAT % Sand/MBT ~ Ph/ M T Pt/Mf CI 1 ~ ~ ~ ~ - ~ _ _ _ - _ _ ll _ 45 13/8 3/6 _~ 9.5/ ~ / _ /_ _ ~ /22.5 L 9.4/ 1 / _ i _ rr I- ~- - I OPERATIONS SUMMARY __ FROM TO HOURS ~ CODE ~TROUBLE~ SUB ~ PHASE DESCRIPTION 00:00 03:00 3.00 CEMENT DISP SURFAC Continue cementing 9-5/8" surface casing. Mix & pumped 250 bbls of 15.8 ppg Class 'G' at 2.5 to 3 bpm. After 80 bbls of tail pump a ea cemen returns to surface. Never saw Nut plug spacer ahead of cement. Dropped top plug and displaced with 20 bbls of water and 416 bbls of mud at 6 bpm. Lost returns after 350 bbls of displacement, but hole stood full. Bumped plug with 1700 psi. Floats held OK. 03:00 04:00 1.00 CASE P RURD SURFAC Rig down casing & cementing equipment and pull landing joint 04:00 05:00 1.00 CEMENT RURD SURFAC Run wash tool & clean out BOP 05:00 07:30 2.50 CASE P NUND SURFAC Nipple down diverter 07:30 09:00 1.50 CASE P NUND SURFAC Nipple up Unihead and test to 1000 psi 09:00 12:00 3.00 CASE P NUND SURFAC Nipple up BOP stack 12:00 17:30 5.50 RIGMNT T EOIP RGRP SURFAC Repair oil leak in Drawworks 17:30 18:30 1.00 CASE P NUND SURFAC Pick up elevator bails and install wear bushing 18:30 19:30 1.00 RIGMNT P RGRP SURFAC Install guards & EZ torque on drawworks 19:30 21:00 1.50 DRILL P PULD SURFAC Lay down excess HWDP from derrick 21:00 22:00 1.00 DRILL P PULD SURFAC Lay down 8" collars & stabilizers 22:00 00:00 2.00 DRILL P PULD INTRM1 Picking up & run in w/ 5" drill pipe, 45 jts S 135 picked up so far 24 HR SUMMARY: Cement 9-5/8", ND Diverter, NU Wellhead 8 BOP, Rig Repairs, Lay down excess BHA, start picking up 5" DP PERSONNEL DATA -- --- _ _ --- COMPANY SERVICE ~ NO. HOURS j COMPANY ~ SERVECE ~ NO. I HOURS Baker Inteq 6 Dowell 2 Doyon 28 Anadrill 1 Phillips 2 Service Personnel (CIS) 4 MI Drilling Fluids 4 Arctic Catering Inc. 5 Sperry Sun 4 K&M 1 MATERIALS /CONSUMPTION - _ ~- ITEM i UNITS ~ USAGE i ON HAND ITEM ~ UNITS USAGE ON HAND Fuel gals 974 -7,027 Water, Potable bbls 90 -571 Water, Drilling bbls 700 -4,985 SUPPORT CRAFT --._ TYPE I NO ~ REMARKS ~ TYPE ~ NO. REMARKS - _ -- _ - - _ ~ -- - - - CD2-42 2,929 CD2-33 Pnntetl: 9lZ7/ZW'I Z:JS:3/ PM CASING TEST and FORMATION INTEGRITY TEST Well Name: CD2-33 Date: 7/17/01 Supervisor: Dale p Initial Casing Shoe Test Reason(s) for test: ^ Formation Adequacy for Annular Injection ^ Deep Test: Open Hole Adequacy for Higher Mud Weight "~ PHILLIPS Alaska, Inc. A Bd58ktiaxy of PWILiIPS PETROLEUM CCkv9RANY LEAK-OFF DATA CASING TEST DATA MINUTES MINUTES FOR FOR LOT STROKES PRESSURE CSG TEST STROKES PRESSURE Casing Size and Description: 9-5/8" 40 ppf, set at 5824 md, 3577 TVD ~ ' ® . - (} psi ____ t----------------~----- ----- ------------ ' ' 4---------------y 1.0 ------------ F ~ ---L•---•----------- I Casing Setting Depth: 5,824 TMD Hole Depth: 5,858 TMD 2.0 ! 3,577' TVD Y 3.0 100 psi ud Weight: 9.8 ppg Length of Open Hole Section: 34' - ------------ ----------------~ -------------- -----4.0 -- ------------ 5:0 ---- -- __ --- ---140 - si '' ---f---190 psl --i - - --- 6.0 230 psi EMW = Leak-off Press. + Mud Weight = 790 psi + g,g ppg 0.052 x TVD 0.052 x 3,577' EMW for open hole section = 14.0 pPJ Used cement unit NO Pump output = 0.0997 bps Fluid Pumped = 1,7 bbls Ri um used # 2 Fluid Bled Back = 0,5 bbls 900 i 2 ps , 600 i 2 ps , 2,700 psi 600 psi 2 , 500 i 2 ps , 2 400 i , ps 300 i 2 ps , 200 i 2 ps , 2 100 i , ps 000 i 2 ps , i 900 1 ps , 600 i 1 , ps W 1 700 i , ps ~ 1,600 psi 500 i 1 ps ~ , 400 i N 1 , ps W 1 300 i ps , 200 1 d 1 , ps 100 i 1 ps , 1,000 psi 900 i ps 800 i ps 700 f ps 600 i ps soo i ps 400 i ps aoo i ps 200 i ps 100 i ps 0 i ps 0 10 20 30 40 50 60 STROKES NOTE: STROKES TURN TO MINUTES DURING "SHUT IN TIME":see time line above TIME LINE LEAK-OFF TEST CASING TEST LOT SHUT IN TIME CASING TEST SHUT IN TIME ~-TIME LINE I I 290 psi 7.0 ---- - ---------------- - 8.0-- ----------------~----- -- __ ---E---350 s --- --- --i p 9.0 F 410 si I ~ ----------------~ !•--------------- ' ------------ - 10.0 ---~-- -480---Si -- i? -----~ 11.0 ~ 530 psi ---------------T ! ----12.0 - __ --- ---580 - si ~ ~ •----------------~- u.-----°-------r- ------------ 13.0 - ---F-- S -- -620- ' ! y---•--'•---•---r 14.0 •--------•-- I ---f-- 690 psi ! ---••--•-•----H ' I 15.0 740 psi ----------------~----16.0 - _ -- ~---790 psi _, ----------------h ---------------F-------------: - i ---17.0 I 780-psl_._~ i ~ r---------------T--------•--- ----------------~------------- i i _~ •--~----•---------- ~ ---h-------------°-i i i i ~ t________________i-___-.__-___-._~_._-_.-___-___._ I I SHUT IN 71ME . SHUT IN PRESSURI ''r--°------'-----F'°-----° °----r°--° ° -----°-i G - 0.0 mm ~ ---~- ------------ I - ---~- -780 psl _ i --- 1.O min ---!- -- ------------ ---;-- ! 530_ si p - y 2.0 min ~-- ----- - --Y ----•------• 520 psi--- ---~--------- I 3.0 min I I I 510 psi ~---4 d min---~------------ i t - --->•---510---si i i i P ~ ----------------~ I 5.0 min i ~ i ------------ --- -- i ------ -----~ 510 psi ~ ~ t----------------~ 6.0 rnin --------•- -•-- --------_--- ----•---•--- _--~-- •- •- _ ---_----•---- y _ -------••---- ~ ~ Y 7.4 min ~ ~ i--°------------F---°------- I 8.0 min i 4 ---h----------------i ~ ----------------L------------ ! 9.0 min ! ----------------~------------ _ -•- ----------••---- ~ ' I ---~----------------a ;__10.0 min I I I NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY • Modified by Scott Reynolds CASING TEST and FORMATION INTEGRITY TEST Well Name: CD2-336 Date: 8/16/01 Supervisor: Mickey & Wittry p Initial Casing Shoe Test Reasons} for test: ^ Formation Adequacy for Annular Injection ^ Deep Test: Open Hole Adequacy for Higher Mud Weight ';"";" PHIL.LIPS~Alaska~t~nc. _ CASING TEST DATA MINUTES FOR CSG TEST STROKES PRESSURE Casing Size and Description: 9-5/8", 40ppf, w/Whipstock window f/3840' t/3856' ; ; 0 ' 0 psi ; - -_- - _--_ h----------------F------------- ~- i 2:0 _ ; 100 psi t 1 A mm Casing Setting Depth: 3,840' TMD Hole Depth: 3,878' TMD _ -A- 1.5 min -• 4.0 •-L-----•--•- 200 psi 3,062' TVD 3,072' TVD ; 2.0 min 7.0 400 psi ~---------••~ ---Y--- min ; i --------- 8.0 ---~-•- --------~ ----- ~ 460 psi ; Mud Weight: 9.6 ppg length of Open Hole Section: 3$' ______________ _ -- ----=-- I -~ F - i EMW = Leak-off Press. + Mud Weight = 460 psi + 9.6 ppg 0.052 x TVD 0.052 x 3,062' EMW for apen hole section = 12.5 ppg Used cement unit NO Pump output = 0.0997 bps Fluid Pumped = 0.8 bbls Ri um used # 2 Fluid 81ed Back = 0.8 bbls 800 1 i , ps 600 1 i , ps A, ..:*-r.... ~-. ,--, - ~--~ ~ 1,400 psi 1 200 i TIME LINE , ps 1 00o i LEAK-OFF TEST ~ , ps m w eoo i ~~ CASING TEST _-'-LOT SHUT IN TIME ps a 60o i --CASING TEST SHUT IN TIME 'TIME LINE ps 400 si - - - p Z00 i . ps 0 i ps 0 5 10 15 20 25 30 35 40 45 50 55 60 STROKES NOTE: STROKES TURN TO MINUTES DURING "SHUT IN TIME":see time line above LEAK-OFF DATA MINUTES FOR LOT STROKES PRESSOR ; i i i t---------------T----------••---~-•--------------~ ~---------------= I I F----°---°----F°--------------i i ~------•----_--_y---------------"----------------y 1 1 1 1 1 I 1 1 Y---------------T---••------•----~----------------1 4°----------°--~--°-----°----F°---------°---i L-----------•-•-•L---------------L--•-------------J I I 1 1 1 t---------------±-----------.---r----------------~ i i ~ ~---------------T- r----° --°--------_---F-------'-------f----------------~ i i ~ i f----------------F---------------h----------------i SHUT IN TIME . SHUT IN PRESSURF 0.0 min ; ~ __460-psi ---------~---------------~- ----- 1.0 min , 440 si p 2.0 min ~ E - 420 psi ------- ------------- ' 3.0 min i ' ------- ~ -- ------ 410 psi ; •°----°--------I--°°-- 4.0 min ------ --------h ------- ` -- ----------- a - 400 pst ~ - 5.0 min - ~ 400 psi ~ ~ ---: ---°----'-- ------ 6 0 mm --°'-°r °--------°---- ~ .-- . 0 min ~ 7 ' - - . 8.0 min---~------- --------f ----------------i --t------- 9.0 min ; --------~ ----------------', j --- 10.0 min j i i NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY • II Modified by Scott Reynolds Casing Detail Well: CD2-33B ~~"~~ r ~~LL~r ~~~ ln~. ntermediate Casing Date: 8!24!01 A S€sidf~ry of PHILLfRS PETRQLEt,~9 C~ddPANY DEPTH Jt Number Num of Jts COMPLETE DESCRIPTION OF EQUIPMENT RUN LENGTH TOPS Doyon 19 RKB to LDS 34.33 FMC 11" X 7" Hanger 1.30 34.33 Jts 3 to 242 240 Jts 7" 26# L-80 BTCM Csg 9859.34 35.63 7" Davis Lynch Float Collar 1.50 9894.97 Jts 1 to 2 2 Jts 7" 26# L-80 BTCM Csg 83.47 9896.47 7" Davis Lynch Float Shoe 1.70 9979.94 9981.64 TD 8 1/2" hole 9,992' 1 SB centralizer per jt #1 - #20 1 SB centralizer every other }t # 156 - #240 Total - 63 centralizers Use Best-o-Life 2000 Remarks: Up Wt Dn Wt- Supervisor.' Don • • PHILLIPS PHILLIPS ALASKA INC. Page 1 ot2 ~ ' Cementing Report Legal Well Name: CD2-33A Spud Date: 6/29/2001 Common Well Name: CD2-33A Report #: 1 Report Date: 8/24/2001 Event Name: ROT -SIDETRACK Start: 8/1/2001 End: 9/1/2001 Cement Job Type: Primary ~ _Primary _ _ ~ _- --- -- -- T- -__ _ _ ScLueeze Open Hole _ _ Squeeze Casing__ _ I _ _Plu~_ __ _ - _ Hole Size: 8.500 (in) Hole Size: Hole Size: Hole Size: TMD Set: 9,982 (ft) SQ TMD: (ft) TMD Set: Top Set: (ft) Date Set: 8/23/2001 SQ Date: Date Set: BTM set: (ft) Csg Type: Intermediate Casing/Li SO Type: Csg Type: Plug Date: Csg Size: 7.000 (in.) SQ TMD: Plug Type: SQ Date: Drilled Out: Cmtd. Csg: Intermediate Casing/Li Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Co: Dowell Schlumberger Cementer: Pipe Movement: No movement Pipe Movement Rot Time Start: Time End: RPM: lnit Torque: (ft-Ibf) Avg Torque: (ft-Ibf) Max Torque: (ft-Ibf) Rec Time Start:: Time End: SPM: Stroke Length: (ft) Drag Up: (lbs) Drag Down: (Ibs) Stage No: 1 of 1 --_--_--- Type: Cement Casing T Start Mix Cmt: --- Disp Avg Rate: 4.00 (bbl/min) Returns: slight Volume Excess %: 40.00 Start Slurry Displ: Disp Max Rate: 6.00 (bbllmin) Total Mud Lost: 450.00 (bbl) Meas. From: Start Displ: Bump Plug: Y Cmt Vol to Surf: (bbl) Time Circ Prior End Pumping: Press Prior: 680 (psi) To Cementing: 0.30 End Pump Date: 8/23/2001 Press Bumped: 1,200 (psi) Ann Flow After: N Mud Circ Rate: 6 (gpm) Top Plug: Y Press He{d: 5 (min) Mixing Method: Mud Circ Press: 1,000 (psi) Bottom Plug: Y Float Held: Y Density Meas By: ppg Mud Data Type: Polymer Density: 10.1 (ppg) Visc: 41 (s/qt) PV/YP: 6 (cp)/20 (Ib/100ft2) Gels 10 sec: 7 (Ib/100ft2) Gels 10 min: 9 (Ib/100ftz) Bottom Hole Circulating Temperature: (°F) Bottom Hole Static Temperature: (°F) Displacement Fluid Type:Mud Density: 10.1 (ppg) Volume: 359.00 (bbl) rnn[ea: yiuitw_i t:oo: w rm • • I PHILLIPS PHILLIPS ALASKA INC. Page 2 of 2 ~ ° Cementing Report Legal Well Name: CD2-33A Spud Date: 6/29/2001 Common Well Name: CD2-33A Report #: 1 Report Date: 8/24/2001 Event Name: ROT -SIDETRACK Start: 8/1/2001 End: 9/1/2001 Casing Test Shoe Test Liner Top Test Test Press; (psi) Pressure: (ppge) Liner Lap: For: (min) Tool: Pos Test: (ppge) Tool: Cement Found between Open Hole: (ft) Neg Test: (ppge) Tool: Shoe and Collar: Hrs Before Test: Hrs Before Test: Cement Found on Tool: Log/Survey Ev aluation Interpretation Summary CBL Run: Cement Top: (ft) Under Pressure: (psi) How Determined: Bond Quality: TOC Sufficient: Cet Run: Job Rating: Bond Quality: If Unsuccessful Detection Indicator: Temp Survey: Remedial Cementing Required: Hrs Prior to Log: Number of Remedial Squeezes: Printed: 9/27/2001 2:55:15 PM • • PHILLIPS Page 1 of 2 Phillips Alaska, Inc. f ~ o Daily Drilling Report WELL NAME JOB NUMBER EVENT CODE 24 HRS PROG TMD TVD DFS REPT NO. DATE CD2-33B RST 9 992.0 7,293.0 17.13 19 8/2312001 SUPERVISOR RIG NAME & NO. FIELD NAME / OCS NO. AUTH MD DAILY TANG CUM. TANG Don Micke Do on 19 AI ine 0.00 0,00 CURRENT STATUS ACCIDENTS LAST 24 HRS.? DAILY INT W/O MUD CUM INTANG W( MUD Testin BOPE 0.00 0.00 24 HR FORECAST DATE OF LAST SAFETY MEETING DAILY TOTAL CUM COST W/ MUD Finish testin BOPE - UD 5" Drill i e - P/U 4" drill i 8!20!2001 227,417 2,808,822 LITHOLOGY JAR HRS OF SERVICE BHA HRS SINCE INSP LEAKOFF AFE AUTH. 12.49 998D06 LAST SURVEY: DATE TMD INC AZIM LAST CASING NEXT CASING LAST BOP PRES TEST 8/22/2001 9,923.03 84.030 325.290 7.000 in 9,982.0 ft in ft 8/15/2001 DENSITY(ppg) 10.10 i ECD i, P~ 0.00 I CUM COST j MLfD DATA ~ DAILY COST 0.00 ~ _ _ _ _ _ _ _ _ _ ___ _ FV ~PVlYP~ GELS ~ WUHTHP FClT.SOL? OIUWAT /Sand/MBT I Ph/pM PHMf ~ CI Ca ~ H2S UME ES ~ ~ ~ ~ -~~ --- -~ ----}--~ -I- ~-- i _ ~ ~ ~ ~ 6 i 41 6/20 7/9 4.2/9. / / /10.0 9.2/ i -----~---~---_-'------___--1------J----- ~___ ~ ----~---'----- BHANO_i ~ BITNO. I 5 s i BHA /HOLE CONDITIONS ,_ _ _ --- -__- _ _ _!. _ BHA wT, BELOW JARS STRING WT. UP i STRING WT DN STRING WT. ROT TORQUE !UNITS ~, BHA LENGTH -- -_ -_ __-. -_ ~- - - - --. - ----- j------- - - ---- -- i i 888.97 ft L 1 _---- __----- ------ ------ r--~__ r-- ----~--- - - - - O.D. I LD. C ITEM DESCRIPTION NO JTS j LENGTH ~ j ONN SIZE CONN TYPE BIT 1 1.00 8.500 MOTOR 1 21.04 8.375 NMSTAB 1 4.48 8.125 GAMMA SUB 1 22.57 7.500 3.250 MWD 1 29.90 7.000 3.250 NMCSDP 3 88.70 6.250 XO 1 1.68 6.250 HWDP 3 89.48 6.500 JARS 1 32.98 6.125 HWDP 20 597.14 6.500 BITS . _ _ i - I -------- ---- -__ -__ - _ ----- BIT !RUN SIZE - MANUF, TYPE ~ SERIAL NO. ~~ JETS OR TFA DEPTH IN DATE 1N j I O-D-L-B-G O-R ___ -_- ~__ __ ------1 -- --- ~--- _. . 5/ 1 8.500 HUGHES-CHR MX-09DX S41DH 15/15/15/// 8,976.0 8/21/20011-2-LT-G-E-1-NO-TD BIT OPERATIONS _ --- - --- - - ----~----T - - -- T - -- ~-- -,~--- BIT I RUN WOB i RPM GPM j PRESS ~ P BIT HRS T 2AHr DIST ! 24Hr ROP j CUM HRS TCUM DEPTH I CUM ROP - - -- - _ ____ -~ -- __-a---~- ------ -_ ~_----t-- -~-- -- t ------ --~- ~ 5 ( 1 ~ 5l 25 11801 240 ~ 548 2,630 I 1,054 '~ I ~ 52.26 ~ 10.60 I 1 016.0 ~ 95.85 OPERATIONS SUMMARY FROM j TO I HOURS ~ CODE ~TROUBLE~ SUB ~ PHASE DESCRIPTION 00:00 01:30 1.50 DRILL P TRIP INTRMI Continue POOH laying down 5" drill pipe 01:30 02:00 0.50 DRILL P TRIP INTRM1 Pull & std back HWDP & jars 02:00 03:00 1.00 DRILL P PULD INTRM1 UD remaining BHA -MWD, motor, bit 03:00 03:30 0.50 DRILL P OTHR INTRM1 P/U stack washer & flush stack & well head 03:30 04:00 0.50 DRILL P OTHR INTRM1 Pull wear bushing 8 set thin wall wear bushing 04:00 06:00 2.00 CASE P RURD INTRM1 PJSM -rig up to run 7" casing 06:00 16:30 10.50 CASE P RUNC INTRMI Ran 242 jts. 7" 26# L-80 MBTC casing - circ pipe volume @ 3820' -landed casing on mandrel hanger w! shoe @ 9982' - FC @ 9895' 16:30 17:00 0.50 CASE P RURD INTRMI UD fill up tool ~ M/U cement head 17:00 18:00 1.00 CEMENT CIRC INTRM1 Circ & condition mud for cement job -stage pumps f/ 2 BPM to 6 BMP @ 1000 psi -pumped 120 bbls w/ full returns, then lost retums -attempt to regain circulation -work pipe & reduce pump rate -Observed fluid !eve{ just below flow line -lost 100 bbls 18:00 20:30 2.50 CEMENT DH OTHR INTRM1 Build 280 bbls 10 ppg mud & mix LCM pill w! 8 ppb LCM Printed: 9/27/2001 3:D9:26 PM • • PHILLIPS Page 2 of 2 Phillips Alaska, Inc. ~ ~ Daily Drilling Report WELL NAME - JOB NUMBER EVENT CODE 24 HRS PROG TMD TVD i DFS REPT NO. ~ DATE CD2-336 RST __9,992.0_; 7,293.0 i,_ 17.1.3 19 L8123/2001 OPERATIONS SUMMARY FROM L TO HOURS ~ _____ _ --- CODE iTROUSLE~ SU8 ~ PHASE 1 DESCRIPTION _ _ 20:30 23:00 2.50 CEMENT PUMP INTRM1 Decision made to cement casing -Cement 7" casing as follows: Pumped 20 bbls LCM pill - 5 bbls water -test lines to 3000 psi -mix & pump 50 bbls 12.5 ppg Arco spacer -drop btm plug -mix & pump 32 bbls 15.8 ppg G cmt w/ 0.2% DO 46, 0.25% 0065, 0.25% 0800 & 0.18% 0167 -drop top plug w/ 20 bbls water -displace w/ 359 bbls mud @ 4 to 5.5 BPM w/slight returns -Observed pressure increase f/ 350 psi to 380 psi as LMC pill was turning corner -pressure keep increasing as spacer and cement turned corner - 380 psi to 680 psi before bumping plug wi 1200 psi -floats held CIP @ 2300 hrs -Flow never increased from a slight flow 23:00 00:00 1.00 CEMENT PULD INTRMI Break out & lay down cement head & landing jt.- pull thin wall wear bushing 24 HR SUMMARY: Finish POOH w/BHA # 4 -Ran 8 cmted 7" casing PERSONNEL DATA COMPANY SERVICE COMPANY SERVICE I NO. HOURS NO. HOURS 1 _ _ _ J ~ P _ Baker Inteq 2 Dowell 2 Doyon 27 Anadrill 2 Phillips 2 Service Personnel (CIS) 4 MI Drilling Fluids 4 Arctic Catering lnc. 5 MATERIALS /CONSUMPTION _ ITEM i UNITS I USAGE T ON HAND tl ITEM I UNITS ~ USAGE ~ ON HAND ~ _ Fuel gals 1,146 -35,778 Water, Potable bbls 90 -4,255 Water, Drilling bbls 380 -26,415 SUPPORT CRAFT TYPE i __ NO. I REMARKS ~ TYPE NO. ~ REMARKS CD2-24 CD2-33B Printed: 9/27/2001 3:09:26 PM CASING TEST and FORMATION INTEGRITY TEST Well Name: CD2-33B Date: 8/27/01 Supervisor: Don Mickey ^ Initial Casing Shoe Test LEAK-OFF DATA Reason(s) for test: p Formation Adequacy for Annular Injection MINUrEs ^ Deep Test: Open Hole Adequacy for Higher Mud Weight FoR ~--------------- ~ ----2~=0---° 1,465 ~]si ~ Y - - i•--•---•---Q-'-•'{ { 23.0 { 1,264 psi { -°--------°---F------°----°-F------°----- . i 26.0 1,209 psE ; _________________r-__.____-_--_-_~.___--_-_---_---~ •---------°-----F--°---°------F----°--------° ~ '---------°-----~-------°------t----°--------- I ' ~ i ~ i ~_-_-__-____- r________________~ 'I'-----------°---~--°-°---°---h---------°-°--~ i ~ ~ ~ ~ i ~ i t---------------- -------------~----------------1 r----------- ; 1 SHUT iN TIME . SHUT IN PRESSURE _ 0.O min ; -1:209 psl -~ _ 1.0 min -.2.0 min-- ~---------------;----------------~ 3.0 min I f----------------I•-----------°--F----------°-°-i 4.0 min t---------------a,-_-_--_._-._._-~_._--_-_-_--_-.-~ 5.0 mm ' 8.0 min ~ ' t 7.0 min ~------°--,°---F-°----°------F-°-°--°---°-~ 8.0 mm ; t---------------A__.._________-__i_-__-____-____-- ; 9.0 min ; ; ~__14.0_min- ~ -------------- ~ ----------------- LOT BBLS PRESSURE Casing Size and Description: 9 518" 40# L-80 BTC X 7" 26 # L-80 MBTC --------- ( _ -- -- 0 ---- -- - - --- --h- 0 psi -- - { ----------- i TOC I ~ t ~ 4-0 I 46 psi ~ Casing Setting Depth: 3,840' TMD Hole Depth: 9,180' TMD ------°------- -- ; ; --- 8.0 - --- 46 psi 3,082' TVD 6,994' TVD ____ _________ __ - ~ ~ __ 10.0 { 46 psi --------------° -- s.--------------- ' -~-- -------------~----9fi --5~ ---~ 12.0 p ; -- ---- --- --- -- Mud Weight: 9.9 ppg Length of Open Hole Section: 5,34Q' , 14.0 f ~ si i 398 p ----------------. -- ----------- 17.0 - -- ------- ----- 993 psi EMW = Leak-off Press. + Mud Weight = 1,465 psi + g.g ppg 0.052 x TVD 0.052 x 3,062' EMW for open hole section = 19.1 ppg Used cement unit yes Pump output = bbls pumped Fluid Pumped = 26.0 obis Ri um used Fluid Bled Back = 0.5 bbls 7 700 si , p 1, 1 , 1 , 1, 1, , . ~ 1, h w 2' a P 0 10 20 30 40 50 60 STROKES NOTE: STROKES TURN TO MINUTES DURING "SHUT IN TIME":see time line above 600 psi 500 si p 400 si p 300 si p Zoo psi TIME LINE 100 si p 00o psi 900 si LEAK-OFF TEST ~~ p eoo si CASING TEST '~"" p 7oo si 1rOT SHUT IN TIME '' p soo si CASING TEST SHUT IN TIME ~ p T{ME LINE 500 psi 400 si p 300 si p 200 psi 100 i ps 0 si ~' , PHILLIPS Alaska, Inc. A SsbS~lary of PMILLIPS PETROLEIRvt COh4PANY CASING TEST DATA MINUTES FOR CSG TEST STROKES PRESSURE -__~-•---- i ; 0 -_-_-._ ---------~---_•-- p --_* stks ~ 0 si { I•--------------- --- 1--- --------- --------------i t-- --------°---°i--°-- -------°i---------°------f •------------•-•~---------------T---------•--•---~ .•---°-°---°--i----------°---i-------°--------i ~•- ---°-°-------i------ _, T--------------- ~ -------°i----°------°---t I ~ i i I i i T '._ ~--------------- -_-_-__--_--.---t •-°------------i---°----------~----------°-----i ~ r i i i,---------------y_-_.-_._-_-._-i -_-_---__.--_-_.~ i I SHUT IN TIME i ---- SHUT IN PRESSURE ---------------~---------- ----- -- ----- 0.0 min { , , o si --------------- 1.0 min t 2.0 min ' i 3.0 min ; °------- ^-i------ °--- 4.0 min ; -----°--•i---°---°---°°f --~------ 5.0 min ----------I-----------------1 6.0 min j 1._______________~_--_-. ; 7 0 m;n ; -_----_-_~-_-_--_-_-_--.-_-,~ •-_ ; --°-i------ 8.0 min ~ ---°----~--------°-------~ •--------------- ------ 9.0 min ~ ---------~-----------------s ------ ~•--10.0 min- ---------~----------------- ~•---------------1------ 0 min { 15 ----------I-----------------I : ----~------ ; 20.0 min ------°-a-°--------------f ~ 25 0 min ;- ~ - : --- ---;------ , ---------1-----------------~ 30.0 min NOTE: TO CLEAR DATA, HIGHLIGHT AND PRESS THE DELETE KEY • lr, u Modified by Scott Reynolds e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inset1s\Microfilm _ Marker.doc DATA SUBMITTAL COMPLIANCE REPORT 7~30~2003 .~'/~ Permit to Drill 2011200 Well Name/No. COLVlLLE RIV UNIT CD2-33 Operator CONOCOPHILLIPS ALAS~ INC APl No. 50-103-20381-00-00 MD ~ . ~D 7596 ~' Completion Dar 8/5/2001 ~ Completion Statu P~ - Current Status P~_ UIC N_ REQUIRED INFORMATION Mud Log N~ Sample N~ Directional Su~ey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Log Log Run Type Media Fmt Name Scale Media No -~ ....? GR Gamma Ray 25 BM 1 (data taken from Logs Portion of Master Well Data Maint) Interval OH / Start Stop CH Dataset Received Number Comments 5383 18621 Open 6/11/2002 ) GR Gamma Ray Lo ~ L,,~,,' Ind Induction/Resistivity ,BI~-' C Pds Ne Neutron EH~ C GR Gamma Ray ,..I.,~" ~ Induction/Resistivity F, J3--C Pds Ind Induction/Resistivity ~ C Pds De Density ,ED C Pds De Density EO-" C Ind Induction/Resistivity ,.F,.D C Pds Ind Induction/Resistivity ~ C Pds Ne Neutron 25 BM 1 25 BM 1 1 1 25 BM 1 1 1 1 1 1 1 5383 18621 Open 6/11/2002 5383 18621 Open 6/11/2002 114 21464 Open 12/21/2001 10479 5383 18621 O Den 6/11/2002 10870 5383 18621 O 114 21464 O 114 21464 O 114 21464 O 5383 18621 O 114 21464 O 114 21464 O Den 6/11/2002 Den 12/21/2001 10479 / ~en 12/21/2001 10479" ~en 12/21/2001 10479" ~en 6/11/2002 10870 ~en 12/21/2001 10479/ 3en 12/21/2001 10479,/ Well Cores/Samples Information: Name Start Interval Stop Dataset Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y/{~ Chips Received? ~ Analysis R~.n~.iv~.d ~ Daily History Received? {~ N Formation Tops t~/N Permit to Drill 2011200 DATA SUBMITTAL COMPLIANCE REPORT 713012003 Well Name/No. COLVlLLE RIV UNIT CD2-33 Operator CONOCOPHILLIPS ALASKA INC APl No. 50-103-20381-00-00 MD 21467 TVD 7596 Completion Dat 8/5/2001 Comments: ~ ~ ~"~ ~****- ['~ g~ ~ P'~ ~ ~b Completion Statu P&A Current Status P&A UIC N Compliance Reviewed By: ......... ~ Date: ConocoPhillips Alaska, Inc. Surface Casing by Conductor Annulus Cement Top-Off Alpine Field, CD-1 CD-2 W~LLS DEPTH VOLUME TYPE SACKS BBLS Cement CD1-1 2.25' ...... -013-- WI - 1.8 CD1-2 4' 0.6 WI 3.6 · CD1-3 10' '1.-4 MI 8.5 , CD1-4 7.33' 1 P 6.0 CD1-5 4' 0.6 MI 3.6 ...... CD1-6 10.42' 1.4 Gl 8.5 CD1-16 14.33' 2 Wi-' ' 12.1 CD1-17 8.75' 1.2 P 7.2 CD1-21 13' 1.8 " --MI 10.9 CD1-22 1.83' 0.3 P 1.8 CD1-23 15.42' 2.1 MI 12.7 CD1-24 2' 0.3 P 1.8 CD1-25 5.66' 0.8 P 4.8 CD1-27 18.83' 2.6 P 15.7 CD1-28 6.75' 1 P 6.0 CD1-32 8.33' 1.2 P 7.2 CD1-34 41.83' 5.7 P 34.4 CD1-36 16.75' 2.3 WI 13.9 CD1-38 3.5' 0.5 P 3.0 CD1-42 5.83' 0.8 MI 4.8 CD2-16 11.66' 1.6 INJ 9.7 CD2-17 18' 2.5 INJ 15.1 CD2-19 11.66' 1.6 P 9.7 CD2-22 13.5' 1.8 INJ 10.9 CD2-25 27.25' 3.7 P 22.3 CD2-26 10.42' 1.4 INJ 8.5 CD2-32 8.5' 1.2 INJ 7.2 CD2-33 ~- 7' 1 P 6.0 CD2-34 4' 0.6 P 3.6 CD2-41 11.83' 1.6 P 9,7 CD2-46 7.42' 1 INJ 6.0 CD2-48 10.33' 1.4 INJ 8.5 CD2-49 9.33' 1.3 INJ 7.8 CD2-50 1.66' 0.25 P 1.5 ConocOPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 23, 2003 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Maunder: Enclosed please find a spreadsheet with a list of wells from the Alpine field (CRU). Each of these wells was found to have a void in the conductor by surface casing annulus. The voids were filled with cement to the top of the conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place. In the fall of 2002, CD 1-23 was reported to have a "wobbly" tree. The top of cement was measured at 15- feet below the top of the conductor. Plans were made to stabilize the wellhead by top-filling cement later in the winter when the ice road to Alpine had been installed. Since that is considerable effort and expense for pumping a small load of cement, a survey was made of each conductor to see if voids were present. A list of 34 wells was put together that would need additional cement. The top-fill operation was started on April 15th and was completed on April 16th, 2003. Dowell- Schlumberger batch-mixed Arctic Set I cement to 15.7 ppg in a blender. The cement was pumped via high-pressure hose into the conductor. The cement was brought to the top of conductor on each well. The blender/pump and hose worked down the line, filling the identified wells until the list was completed. The attached spreadsheet presents the well name, top of cement depth prior to filling, and the number of sacks used on each conductor. Please call MJ Loveland or Nina Woods at 907-659-7224, or me at 659-7043 if you have any questions. Sincerely, Jerry Dethlefs ConocoPhillips Problem Well Supervisor Attachment lop I-ill Subject: Alpine Cement Top Fill Date: Wed, 23 Apr 2003 17:38:26 -0800 From: "Jerry C Dethlefs" <Jerry. C.Dethlefs@conocophillips.com> To: Tom Maunder <tom_maunder@admin.state.ak.us> CC: "n1617" <n1617@conocophillips.com> Tom: Attached is a letter and spreadsheet with the data mentioned in the previous email. Thanks for the relief on all the Sundry's! Let me know if you need additional information. Jerry Dethlefs Problem Well Supervisor ConocoPhillips Alaska(See attached file: AOGCC ALPINE cement top outs 04-16-03.xls)(See attached file: Cement Top Fill AOGCC Letter 04-23-03.doc) Tom Maunder <tom_maunder@admin.state.ak.us> 04/23/2003 12:51 PM To: Jerry C Dethlefs/PPCO@Phillips cc: Subject: Re: Sundry's for topping off cement Hi Jerry, I agree Jerry that individual 404's aren't necessary. Send a "global document" with the information you list. There should also be some sort of introduction that describes why you did what you did and how you did it. Tom Jerry C Dethlefs wrote: > Tom: Last week we had a cement crew go down the line at Alpine, top filling > the conductors with cement. I believe 34 wells were treated. Chuck Scheve > and John Crisp were notified but declined to witness when we told them what > we were doing. Some time past we had agreed to submit a 10-404 for this > kind of work. Due to the number of these, is a 10-404 needed on each well? > I don't want to commit the time to doing this flit is not necessary; > 10-404's are time consuming to prepare. Would a list of the jobs suffice, > or something similar? We have the well numbers, depth to cement top, and > sacks used to fill the void. My proposal would not affect future > submissions of 10-404's for this work. What do you think? Thanks! > Jerry Dethlefs (See attached file: tom_maunder.vcf) 1 of 2 4/24/2003 7:55 AM /&lplll~ L,,~lll~llt lOp I-ill r~AOGCC ALPINE cement outs 04o16o03.xls top Name: AOGCC ALPINE cement top outs 04-16-03.xls Type: EXCEL File (application/msexcel) Encoding' base64 I Name: Cement Top Fill AOGCC Letter 04-23-03.doc ['-~Cement Fill AOGCC Letter 04-23-03.doc WlNWORD File Top Type: (application/msword) Encoding: base64 Tom Maunder <tom maunder~admin.state.ak, us> Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 2 of 2 4/24/2003 7:55 AM Schh berger Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1683 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Alpine 12111/01 Color Well Job # Log Description Date BL Sepia Prints CD CD2-33 21451 M10,CDR,ARC & D/N 08/04/01 1 CD2-33 21451 MD VISION RESISTIVITY 08/04/01 I 1 CD2-33 21451 TVD VISION RESISTIVITY 08/04/01 I 1 CD2-33 21451 MD VISION D/N 08/04/01 I 1 CD2-33 21451 TVD VISION D/N 08/04101 I I DEC 2i 2001 ~ ~a~a Oil & Gas Cons. C0mm,~si0n A-.~ch0ra~e Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you. Record Of Shipment Of( Confidential Information District: Alaska To: From: AOGCC Phillips Alaska, Inc. ~00i Pc, raup;nc;~r.,..~~ ~vX/'. '-7 ~q'~.~ ,,.~-/'~[CO P.O. Box100360 Anchorage, AK 99501 Attn: Steve Davies Anchorage, Alaska 99510-0360 Attn: Jeanne L. Haas (907) 263-4470 ( x ) Enclosed ( )Under separate cover ()Via Subject: Quantity 1 log 1 log 1 log 1 log 1 report 1 report 1 log 1 log 1 log 1 log Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Description Rig Monitoring TVD log dated 8-14-01 for well CD2-33 Rig Monitoring MD log dated 8-14-01 for well CD2-33 Rig Monitoring TVD log dated 8-15-01 for well CD2-33A Rig Monitoring MD log dated 8-15-01 for well CD2-33A End of Well Report for Alpine CD2-33A End of Well Report for Alpine CD2-33 ~ (.~/'~'/c~ O Rig Monitoring TVD log dated 9-11-01 for well CD2-39 PH Rig Monitoring MD log dated 9-11-01 for well CD2-39 PH Rig Monitoring MD log dated 9-10-01 for well CD2-39 PH Rig Monitoring TVD log dated 9-10-01 for well CD2-39 PH Note - Please verify and acknowledge receipt by signing and returning this transmittal or faxing it. Fax number 265-1515 Signed by Jeanne L. Haas ~:Cmel;kesl b~ ~,~ Date Date 11/15/01 RECEIVED NOV 1 5 2001 Alaska Oil & Gas Cons. Commission Ancb )rage m~m ~mmm~ m ~ 0 C_%T! ON ~L.:_~_R_~ ~CE REPORT Sta~a cf Alaska ALAS~ 0iL & GAS C.'JN~ SERV~TION CCESSION ! - Review "~-e we~__ ___-'-'~e, a:d-ccmmau: c:~ plug'cj'J-:~, well head , sUanus~~ loca=i:: clearance'~- :r=v~ !~/ clear. IO~- ~o3 Y ( Code (' ", STATE OF ALASKA t .... ALASKA OIL AND GAS CONSERVATION COMNn~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil E] Gas ~] Suspended ~] Abandoned [~] Service 2. Name of Operator ~ · 7. Permit Number Phillips Alaska, Inc. ,~J;3~,~~ 201-120 3. Address :' · ~_~)__'~"" 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 i~_~,u~!,,,,.~-z.,., 50-103-20381-00 4. Location of well at surtace Ih-!~~ 9. Unit or Lease Name 1894' FNL, 1523' FEL, Sec. 2, T11U, R4E, UM., ' "'"" '!];.~.~'-~ ~A~ ~,) (asp's: 371715, 5974463) Colville River Unit At Top Producing Interval . ,,> ~,.~'!~ ' 10. Well Number 2083' FSL, 2381' FEL, Sec. 8, T11 N, R4E, UM ...............'~'~/ !i (asp's: 354915, 5968187) CD2-33 At Total Depth ' ':"~'~: ~. ~":'~ ! 11. Field and Pool 1817' FSL, 2150' FWL, Sec. 8, T11 N, R4E, UM"..~...,~ ,. .... , ............~! (asp's: 354163, 5967935) Colville River Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 36.8 feetI ADL388905 /ASRCNPRA02 Alpine Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. of Completions July 7, 2001 July 31, 2001 August 5, 2001 (P&A'd)'1 N/A feet MSL 0 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 21464' MD / 7596' TVD 5677' MD / 3542' TVD YES [~] No r-']I N/A feet MD 1033' (approx) 22. Type Electric or Other Logs Run GR/Res/Dens/Neut 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE V~q'. PER FT. GRADE TOP Be'I-rOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 16" 62.5# H-40 Surface 117' 42' Pre-installed 9.625" 40# L-80 Surface 5824' 12-1/4" 924 sx AS IIIL, 1200 sx Class G P& A Plu~l #1: 21454' to 20790' P&A plu~ ~: plu~l~led back 8.5" openhole from 20883' to 20340' plu~l~ed back 8.5" openhole from 6250' to 5677': kick off plu~ 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) N/A N/A N/A N/A 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 21454'-20790' Plug #1:47.7 bbls, 15.8 ppg Class G cement 20883'- 20340' Plug #2:52 bbl Class G 6250'-5677' 490 sx 17.0 ppg 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas Ii/t, etc.) N/A Plugged & Abandoned Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO I N/A Test Period > Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. 24-Hour Rate > 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. 'ECEIVED OCT 1 ? ZOO1 Alaska Oil& Gas Cons. Comm' · AnChorage '~$io~ Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE ORIGINAL Submit In duplicate GEOLOGIC MARKERS ' FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity. MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Alpine D 20588' 7338' Top Alpine 20632' 7351' Base Alpine 21000' 7457' N/A OcT. 31. LIST OF ATTACHMENTS Summary of Drilling Operations, Directional Survey 32. I hereby certify that the following is true and correct to the best of my knowledge. Questions? Call Scott Reynolds 265-6253 Signed ~~Gh~p A~ r~(~'~-o Title Alpine Drillin,q Team Leader Date INSTRUCTIONS Prepared by Sharon Al~sup-Drake General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21.' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23.' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28.' If no cores taken, indicate "none". Form 10-407 ORIGINAL  PHILLIPS ALASKA INC. Page 1 of 9 Operations Summary Report . Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT- DRILLING Start: 6/28/2001 End: Contractor Name: doyonl @ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyon 19 Rig Number: 19 Date From-To Hours Code Sub Code Phase Description of Operations 7/3/2001 00:00- 11:30 11.50 RIGMNT OTHR MOBMIR Continue rig maintenance. 11:30- 13:30 2.00 RIGMNT SFTY MOBMIR Pre-spud meeting. 13:30- 00:00 10.50 RIGMNT OTHR MOBMIR CONTINUE RIG MAINTENANCE. Top Drive: - Continue reassembling top drive. - Troubleshoot hook-up of new top drive control cable in service loop. (Having trouble with top drive functions. Found problem to be a corroded / wet connector for control cable on derrick near monkey board. Will complete repair AM on 4/July.) Mud Pits / Mud Pumps: - Complete repair and reinstall mud dock elevator to mud pits. Miscellaneous: - Complete instllation of high pressure cmt line / valves through mud pit room, rig mazzanine deck, & rig floor. (Will pressure test line / valves after receiving & installing new jumper hose in mud pit room, while drilling surface hole.) - Complete PM & repair of iron roughneck pipe spinner. (Will reinstall pipe spinner on iron roughneck prior to P/U 5" DP to drill surface hole.) - Serviced / repaired some problem valves on the choke & kill manifold NOTE: Rig maintenance should be completed 4/July with: - Replacement of top drive service loop safety cable; - The repair and testing of the top drive control cable; - Completion of PM on SCR system; - Top drive reassembly (IBOP, alignment, etc.); - Reinstallation of iron roughneck pipe spinner. 7/4/2001 00:00- 00:00 24.00 RIGMNT RGRP MOBMIR Continue rig Maintenance. (Trouble shoot additonal problems with top drive control cable. Found top drive control cable on derrick to be bad. Remove control cable from derrick. Checked control cable, just changed out from service loop for required number of good conductors needed. Will replace bad control cable on derrick with the one just changed out from service loop, while i mobilizing a new replacement cable.) (Changed out 1 safety cable on top drive service loop.) 7/5/2001 00:00 - 00:00 24.00 RIGMNT RGRP MOBMIR Continue rig maintenace and housekeeping. (Top Drive control cable trouble shooting / replaced outer top drive control cable loop.) ~ Install pipe spinners onto iron roughneck. 7/6/2001 00:00 - 05:30 5.50 RIGMNT RGRP MOBMIR Completed new Control loop installation, function test top drive. 05:30 - 08:00 2.50 RIGMNT RGRP MOBMIR Assemble top drive lower unit, install bails and elevators. 08:00- 12:00 4.00 DRILL RIRD SURFAC Install riser and flowline. 12:00- 18:00 6.00 DRILL PULD SURFAC PJSM. PU, and standback 120 jts of 5" drill pipe. 18:00- 00:00 6.00 RIGMNT RGRP MOBMIR Service SCR house (planned maintanence). 7/7/2001 00:00- 00:30 0.50 RIGMNT RGRP MOBMIR Complete planned maintenance in SCR house. 00:30 - 01:30 1.00 DRILL RIRD SURFAC Move BHA components to floor, install bell guide on top drive, hang rotary tongs. 01:30- 02:30 1.00 DRILL PULD SURFAC PJSM. MU motor and MWD. 02:30 - 03:30 1.00 WELCTL BOPE SURFAC Perform Diverter Test, (AOGCC) John Crisp waived witnessing test. 03:30 - 05:00 1.50 DRILL REAM SURFAC Fill conductor and test standpipe to 3500 psi. Clean out ice plug in Printed: 10/16/2001 8:50:59AM  PHILLIPS ALASKA INC. Page 2 of 9 Operations Summar Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT- DRILLING Start: 6/28/2001 End: Contractor Name: doyen1 @ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyen 19 Rig Number: 19 Date From-To Hours Code Sub Code Phase Description of Operations 7/7/2001 03:30 - 05:00 1.50 DRILL REAM SURFAC conductor from 55' to 114'. 05:00 - 00:00 19.00 DRILL DRLG SURFAC Spud well, Drill and survey from 114' to 2285' md. ART=4.5 AST=7.9 2200 tvd. 7/8/2001 00:00- 09:00 9.00 DRILL DRLG SURFAC Drill from 2285' to 2999', ART=2.6 AST=3.9 09:00 - 11:45 2.75 DRILL REAM SURFAC After kelly down @ 2999' (slide) PU with pumps on to 2954', hole )acked off. Worked pipe and attempted to circ, unable to circ. Pulled up to 2711', pumping 2.5 bpm 450 psi no returns, max overpul120k. RIH to 2807' pumping 2.5 bpm and established returns. Staged pumps up to 15 bpm and circ to clean hole with 110 rpm on DP. washed and reamed 2 stands to bottom, continued to circ hole clean. 11:45 - 12:15 0.50 DRILL I REAM SURFAC Change out torn shaker screens and wash pans below shakers. 12:15 - 16:30 4.25 DRILL !DRLG SURFAC Drill from 2999' to 3228', ReP dropped abruptly to 9 fph, unable to increase ReP. ART=2.0 AST=0.7 16:30 - 18:00 1.50 DRILL CIRC SURFAC Circ to clean hole with 16 bpm 110 rpm, pumped 35 bbl wt. 12.2 ppg sweep and circ hole clean, monitor well, static. 18:00 - 00:00 6.00 DRILL TRIP SURFAC POH, max overpull 40 K, hole began swabbing @ 1346'. Pump out from 1346' to 550', continued to POH. LD MWD, Motor and bit, balled and dull. 7/9/2001 00:00 - 02:00 2.00 DRILL TRIP SURFAC PJSM. MU BHA # 2. 02:00 - 05:00 3.00 DRILL TRIP SURFAC RIH to 3090, precautionary wash and ream to 3228'. 05:00 - 00:00 19.00 DRILL DRLG SURFAC Drill from 3228' to 4374' (3199' TVD). ART=7.5 AST=2.3 7/10/2001 00:00- 22:00 22.00 DRILL DRLG SURFAC Drill from 4374' to 5675'. ART=10.2 AST=0.7 Fought heavy gravel running from Permafrost from 4374' on. Increased vis to 250 wt. to 10.0 ppg. 22:00 - 23:30 1.50 DRILL CIRC SURFAC Circ to clean hole, Geologist assest contingency shoe depth. 23:30- 00:00 0.50 DRILL DRLG ,SURFAC Drill from 5675' to 5710'. ART=0.5 7/11/2001 00:00 - 00:30 0.50 DRILL DRLG !SURFAC Drill from 5710' to 5755' ADT .5 00:30 - 01:30 1.00 DRILL OTHR :SURFAC Change shaker screens on both shakers 01:30 - 02:00 0.50 DRILL DRLG SURFAC Drill from 5755' to 5782 ADT .5' - conveyor down 02:00- 03:30 1.50 DRILL OTHR SURFAC I Repair conveyor-change breakers 03:30 - 04:30 1.00 DRILL DRLG SURFAC Drill from 5782' to to 5838' TD - 3581' TVD - ADT 1.4 04:30- 05:00 0.50 DRILL CIRC SURFAC Circulate 05:00- 05:30 0.50 DRILL OTHR SURFAC Repair conveyor 05:30- 08:00 2.50 DRILL CIRC SURFAC Continue circulating and conditioning forcasing 08:00- 11:00 3.00 DRILL CIRC SURFAC i Pump out of hole 120'/hr.-circ4Xbtms up 11:00 - 15:00 4.00 DRILL TRIP SURFAC Continue to pull out on trip tank to 1888' 15:00 - 16:00 1.00 DRILL CIRC SURFAC Tight hole @ 1888' - attempt to circ and clean up hole - hole packing off 16:00 - 20:00 4.00 DRILL TRIP SURFAC Pump out of hole from 1860' to 600'.tight hole, packing off 20:00 - 22:30 2.50 DRILL TRIP SURFAC Trip out from 600' w/o pumps, had to rotate pipe while pulling to get hole to take mud, fluid level would drop in hole when slacking off without rotation to work thru tight spots, significant toque and pull while working stabilizers into conductor shoe 22:30 - 00:00 1.50 DRILL TRIP SURFAC Pull and lay down MWD's, motor, and bit stabilizers and bit partially balled with clay and gravel. 7/12/2001 00:00 - 01:00 1.00 DRILL OTHR SURFAC Clean up rig floor & under rotary 01:00 - 06:00 5.00 DRILL URM SURFAC M/U 12 1/4" hole opener & RIH - took wt. @ 170' - wash & ream f/170' to 1510' 06:00- 07:00 1.00 DRILL OTHR SURFAC Lost high line power 07:00 - 08:30 1.50 DRILL URM SURFAC Wash & ream f/1510' to 2275' 08:30 - 09:00 0.50 DRILL URM SURFAC RIH f/2275' to 2754' - OK - Break circ and wash to 2849' 09:00 - 10:00 1.00 DRILL URM SURFAC RIH f/2849' to 3421' circ 10:00- 11:00 1.00 DRILL URM SURFAC RIH f/ 3421' to 4440' -OK Printed: 10/16/2001 8:50:59 AM  PHILLIPS ALASKA INC. Page 3 of 9 Operations Summar Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT- DRILLING Start: 6/28/2001 End: Contractor Name: doyen1 @ ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyen 19 Rig Number: 19 Sub Phase Description of Operations Date From - To Hours Code Code 7/12/2001 11:00 - 12:00 1.00 DRILL ClRC SURFAC Circ @ btms up @ 4440' 12:00 - 13:00 1.00 DRILL URM SURFAC RIH f/4440' to 5838' - OK 13:00 - 16:45 3.75 DRILL ClRC SURFAC Circ hole clean btms up X 3 - rotate @ 110 rpm - monitor well - static 16:45 - 17:00 0.25 DRILL ClRC SURFAC Pump dry job 17:00 - 19:00 2.00 DRILL TRIP SURFAC POOH to 3707' - hole not taking proper fill 19:00 - 19:30 0.50 DRILL TRIP SURFAC Run back to bottom 19:30 - 21:30 2.00 DRILL ClRC SURFAC Circ bottoms up - Observed 500 units gas @ 2500 stk 21:30 - 23:00 1.50 DRILL TRIP SURFAC POOH to 4661' - 12 stds hole took proper fill 23:00 - 23:30 0.50 DRILL TRIP SURFAC Monitor well - static 23:30 - 00:00 0.50 DRILL TRIP SURFAC POOH f/4661' to 4155' 7/13/2001 00:00 - 01:00 1.00 DRILL TRIP SURFAC Pull out w/hole f/4155' to 3870' - last 5 stds took improper fill - monitor well - static 01:00 - 03:30 2.50 DRILL TRIP SURFAC Pump and ream out of hole f/3870' to 2390' 03:30 - 04:30 1.00 DRILL CIRC SURFAC Circulate - monitor well - static 04:30 - 11:00 6.50 DRILL TRIP SURFAC Continue pump and ream out of hole f/2390' to 355' 11:00 - 12:00 1.00 DRILL TRIP SURFAC POOH f/355' w/no pump or rotary - no problem 12:00 - 13:00 1.00 DRILL OTHR SURFAC Lay down HO, stab, DC - hole opener balled up - clean rig floor 13:00 - 13:30 0.50 DRILL OTHR SURFAC P/U wash tool & wash landing ring area 13:30 - 15:30 2.00 CASE RURD SURFAC Rig up to run 9 5/8" casing 15:30 - 16:00 0.50 CASE SFTY SURFAC Held PJSM on running procedures 16:00 - 19:00 3.00 CASE RUNC SURFAC Begin running 9 5/8" 40# L-80 BTC casing - run 38 jts. to 1540' - took wt. 19:00 - 21:30 2.50 CASE RUNC SURFAC Wash and work casing f/1540' to 1650' 21:30 - 00:00 2.50 CASE RUNC SURFAC Continue running casing to 1832' - unable to RIH w/o washing down 7/14/2001 00:00 - 01:00 1.00 CASE RUNC SURFAC Continue washing 9-5/8 casing down to 2030' 01:00 - 01:30 0.50 CASE CIRC SURFAC Circulate hole clean at 2030', 315 gpm 01:30 - 16:30 15.00 CASE RUNC SURFAC Attempted to run 2 csg jts without washing, took 40K weight on 2 nd it., started washing again at 2090' - Continued washing casing f/2090' to 5824' - Landed casing on mandrel hanger w/shoe @ 5824' & FC @ 5745' - total jts. ran 142 9 5/8" 40# L-80 - Installed Tam port collar @ 1014' 16:30 - 18:00 1.50 CASE RURD SURFAC Circ - rig down casing equip. - clean up rig floor - lay down fill up tool - blow down top drive - install cement head 18:00 - 20:30 2.50 CEMEN'[ ClRC SURFAC Circ & condition mud for cement job 20:30 - 21:00 0.50 CEMEN'[ SFTY SURFAC Held PJSM on cement procedures 21:00 - 00:00 3.00 CEMEN'I PUMP SURFAC Cement 9 5/8" casing - Pumped 40 bbls biozan spacer - 100 bbls mud - 5 bbls water - test lines to 2500 psi - drop btm plug - mix & pump 50 bbls Arco spacer @ 10.2 ppg - 731 bbls lead slurry @ 10.7ppg 7/15/2001 00:00- 03:00 3.00 CEMEN-I DISP SURFAC Continue cementing 9-5/8" surface casing. Mix & pumped 250 bbls of 15.8 ppg Class 'G' at 2.5 to 3 bpm. After 80 bbls of tail pumped had lead cement returns to surface. Never saw Nut plug spacer ahead of cement. Dropped top plug and displaced with 20 bbls of water and 416 bbls of mud at 6 bpm. Lost returns after 350 bbls of displacement, but hole stood full. Bumped plug with 1700 psi. Floats held OK. 03:00 - 04:00 1.00 CASE RURD SURFAC Rig down casing & cementing equipment and pull landing joint 04:00 - 05:00 1.00 CEMEN'I'RURD SURFAC Run wash tool & clean out BOP 05:00- 07:30 2.50 CASE NUND SURFAC Nipple down diverter 07:30 - 09:00 1.50 CASE NUND SURFAC Nipple up Unihead and test to 1000 psi 09:00- 12:00 3.00 CASE NUND SURFAC Nipple up BOP stack 12:00- 17:30 5.50 RIGMNT RGRP SURFAC Repair oil leak in Drawworks 17:30- 18:30 1.00 CASE NUND SURFAC Pick up elevator bails and install wear bushing 18:30 - 19:30 1.00 RIGMNT RGRP SURFAC Install guards & EZ torque on drawworks 19:30 - 21:00 1.50 DRILL PULD SURFAC Lay down excess HWDP from derrick Printed: 10/16/2001 8:50:59AM  PHILLIPS ALASKA INC. Page 4 of 9 Operations Summary Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT- DRILLING Start: 6/28/2001 End: Contractor Name: doyonl @ ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyon 19 Rig Number: 19 Sub Date From- To Hours Code Code Phase Description of Operations 7/15/2001 21:00- 22:00 1.00 DRILL PULD SURFAC Lay down 8" collars & stabilizers 22:00 - 00:00 2.00 DRILL PULD INTRM1 Picking up & run in w/5" drill pipe, 45 jts S 135 picked up so far 7/16/2001 00:00 - 03:30 3.50 DRILL PULD INTRM1 Continue picking up 5" S 135 drill pipe, picked up a total of 159 jts. 03:30 - 04:00 0.50 DRILL PULD INTRM1 Circulate at 15 bpm to flush any possible scale out of drill pipe as precaution for AutoTrak tool 04:00 - 05:30 1.50 DRILL PULD INTRM1 Pull & rack 5" S135 pipe in stds (53stds) 05:30 - 07:00 1.50 DRILL PULE) INTRM1 M/u bit,bit sub w/float,xo - P/U RIH w/5" G DP f/shed 45 jts. 07:00 - 07:30 0.50 DRILL PULE) INTRM1 Circulate @ 15 bpm to flush DP as before 07:30 - 08:00 0.50 DRILL PULD INTRM1 Pull & rack 15 stds 5" G pipe in stds (15stds) 08:00 - 09:00 1.00 DRILL OTHR INTRM1 Pull wear bushing - set test plug 09:00 - 14:30 5.50 DRILL OTHR INTRM1 Test BOPE - Pipe rams,blind rams, kill & choke line valves, choke manifold valves, floor safety valves, top drive valves to 250 psi Iow and 5000 psi high - Hydril to 250 psi Iow & 3500 psi high - Accumlator closure test - Test witnessed and approved by Chuck Scheve AOGCC 14:30 - 15:00 0.50 DRILL OTHR INTRM1 Pull test plug - set wear bushing - blow down kill line, choke line and choke manifold 15:00 - 18:30 3.50 DRILL PULD INTRM1 Continue to pick up & RIH w/5" G DP for shed, picked up 120 jts G 18:30 - 19:00 0.50 DRILL PULD INTRM1 Circulate @ 15 bpm to flush DP as before 19:00 - 20:00 1.00 DRILL PULD INTRM1 Pull & rack 40 stds of G drill pipe 20:00 - 00:00 4.00 DRILL PULD INTRM1 Continue to pick up & RIH w/5" G DP for shed, picked up 157 jts G, 8 more left to pick up 7/17/2001 00:00 - 00:30 0.50 DRILL PULD INTRM1 Finish picking up 5" Gr G drill pipe 00:30 - 01:00 0.50 DRILL PULD INTRM1 Circulate at 15 bpm to flush any possible scale out of drill pipe as precaution for AutoTrak tool 01:00 - 03:30 2.50 DRILL PULD INTRM1 Pull out & rack 55 stds of 5" Grade G drill pipe 03:30 - 04:30 1.00 DRILL PULD INTRM1 PJSM and pick up Autotrak Gen 2.5 system and 8-1/2 HC 605 bit 04:30- 05:00 0.50 DRILL PULD INTRM1 Load Autotrak 05:00 - 07:00 2.00 DRILL TRIP INTRM1 Trip in to 2232 ft. 07:00 - 07:30 0.50 DRILL TRIP INTRM1 Fill string and pulse test Autotrak 07:30 - 09:00 1.50 RIGMNT RURD INTRM1 Slip & Cut Drill line and service top drive 09:00 - 12:00 3.00 DRILL TRIP INTRM1 Trip in to 5655', filling every 2000'. 12:00 - 12:30 0.50 CASE DEQT INTRM1 Circulateair out of dril string before casing test 12:30 - 13:30 1.00 CASE DEQT INTRM1 Rig up and test casing to 2500 psi for 30 rains 13:30 - 15:00 1.50 CEMEN'r DSHO INTRM1 Clean out to float collar and drill plugs and collar, drill cement to shoe 15:00 - 15:30 0.50 CEMEN'r ClRC INTRM1 Circulate thick cement contaminated mud out of hole 15:30 - 16:00 0.50 CEMEN'[ DSHO INTRM1 Drill out float shoe and clean ceemnt out of rat hole to 5838' 16:00 - 16:30 0.50 DRILL DRLG INTRM1 Drill 20' of new hole to 5858' 16:30 - 18:00 1.50 CEMEN'[ LOT INTRM1 Circulate hole clean and conduct LOT to 14 ppg. 790 psi w/9.8 ppg. Shoe did Leak off at 14 ppg. 18:00 - 19:30 1.50 DRILL ClRC INTRM1 Displacespud mud out of hole with 9.6 ppg LSND mud system 19:30 - 20:30 1.00 DRILL CIRC INTRM1 Circulate at casing shoe and establish base line ECD's, open Autotrak. 20:30 - 22:00 1.50 DRILL DRLG INTRM1 Drilling 8-1/2" hole from 5858' to 6004' 22:00 - 23:00 1.00 DRILL ClRC INTRM1 Trouble shoot Auto trak system. Near bit inclinatometer not giving proper angles. Could not correct problem. Decided to drill ahead with MWD inclinometer 23:00 - 00:00 1.00 DRILL DRLG INTRM1 Drill from 6004' to 6070'. (TVD-3634'). 517 gpm, 1380 psi, 110 rpm, 10-15' K WOB 7/18/2001 00:00 - 00:00 24.00 DRILL DRLG INTRM1 Rotary Drill with Autotrak system from 6070' to 7748' MD (4056' TVD). 520 gpm, 1580-90 psi, 100-120 rpm, 10-15 K ADT- 15.6 hrs. 7/19/2001 00:00 - 00:00 24.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/7748' to 9592' MD (4511' TVD) ADT- 15.3 hrs 520 gpm, 1600-1800 psi, 120-130 rpm,10-20 K WOB Continue to double backream before each connection, attempted to Printed: 10/16/2001 8:50:59 AM  PHILLIPS ALASKA INC. Page 5 of 9 Operations Summa~ Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 I Event Name: ROT - DRILLING Start: 6/28/2001 End: Contractor Name: doyen1 @ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyen 19 Rig Number: 19 Sub Date From- To Hours Code Code Phase Description of Operations 7/19/2001 00:00 - 00:00 24.00 DRILL DRLG INTRM1 reduce backreaming time and saw increase in drag on connections. 7/20/2001 00:00 - 11:30 11.50 DRILL DRLG INTRM1 Drill 8 1/2" hole f/9592' to 10,508" - 4740' TVD - ADT 7.7 hrs 520 gpm - 1910 psi pump pressure - 120-130 rpm o 12 -15 K WeB. Double backream after each stand down 11:30 - 14:30 3.00 DRILL ClRC INTRM1 Circulate and conditon hole for wiper trip - circ 3X btms up @ 520 gpm & 120 rpm 14:30 - 18:00 3.50 DRILL WIPR INTRM1 Wiper trip f/10,508' to 5824' (9 5/8" shoe) - Hole in good condition - monitor well - static 18:00 - 20:30 2.50 DRILL WIPR INTRM1 Trip back in hole to 9941', hole good 20:30 - 22:30 2.00 DRILL REAM INTRM1 Precuationary wash & ream from 9941' to 10508'. Max ECD before bottoms up was 11.5 ppg, dropping to 10.9 ppg > bu Max trip gas - 100 Units 22:30 - 23:00 0.50 DRILL ClRC INTRM1 Downlink to Autotrak and take slow pump rates 23:00 - 00:00 1.00 DRILL DRLG INTRM1 Drill from 10,508' to 10,603' (4765' TVD) ADT- I hr 520 gpm 1890 psi 120 rpm, 15-18 K 7/21/2001 00:00 - 00:00 24.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/10,603' to 12, 126' (5148' TVD) 520-550 gpm, 120-125 rpm, 15-20 K Backream twice after each connection (15 mins.) ECD - 11 to 11.2 ppg Lost 1/2 hr trying to get a survey after connection at 12,030' ADT- 15.5 hrs 7/22/2001 00:00 - 00:00 24.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/12,126' to 13,839' MD (5581' TVD) ADT-15.9 hrs Double backream after each connection (15 mins.per conn..) 560 gpm, ECD 11.0-11.2 ppg, 130-135 rpm, 20 K 7/23/2001 00:00 - 04:00 4.00 DRILL DRLG . INTRM1 Drilling from 13,839' MD to 14,125' MD I04:00 - 04:30 0.50 RIGMNT RGRP INTRM1 Saver sub backed out in wrong place on connection, re toque saver sub :04:30- 00:00 19.50 DRILL DRLG INTRM1 = Drill from 14,125' to 15362' MD (5969'TVD) Double backream after each connection (20 mins) 560 gpm, 2160-2350 psi, 120-130 rpm, 18-22 K ECD 11.0 -11.2 ppg Circulated with one pump from 20:15-20:45 while changing piston Pumped hi-vis sweep at 15,267', significant increase in cuttings, sweep came up 130 bbls late. ADT- 15.2 hrs 7/24/2001 00:00 - 00:00 24.00 DRILL DRLG INTRM1 Drill from 15,362' MD (5969' TVD) to 17,000' MD (6386' TVD) Double backream each connection (15 - 20 rains) 560 GPM, 2200-2300 psi, 125-130 rpm, 15-22 K ECD 11.0-11.1 ppg ADT- 16 hrs. 7/25/2001 00:00 - 00:00 24.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/17,000' (6386' TVD) to 18,536' MD (6777' TVD) Double backream (20 rains.) after connections to 17250', then started triple backreaming (30 mins.). Increased mud weight to 9.8.ppg in anticipation of trip for BHA change 7/26/2001 00:00 - 01:30 1.50 DRILL DRLG INTRM1 Drill from 18,536' MD to 18,621' MD (6799' TVD). 01:30 - 02:00 0.50 DRILL SURV INTRM1 Circulate, survey & close Autotrak tool 02:00 - 04:00 2.00 DRILL ClRC INTRM1 Pump a 40 bbl weighted (+2ppg) hi vis sweep w/marker dye & nut plug and circulate to clean hole before trip. Circulate at 560 gpm, rotate at 120 rpm. Sweep came back 200 bbls late. Spotted sweep based on nut plug and vis, did not see die marker. 04:00 - 09:30 5.50 DRILL ClRC INTRM1 Continue to circulate hole clean for trip out at 560 gpm, rotating at 120 rpm. Rack one std back in derrick every 30 mins - 3X btms up - stood back 9 stds to 17,766' - monitor well - static 09:30 - 11:30 2.00 DRILL TRIP INTRM1 Trip out from 17,766 to 16,341 (15 stds) good hole fill - hole in good Printed: 10/16/2001 8:50:59AM  PHILLIPS ALASKA INC. Page 6 of 9 Operations Summar~ Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT- DRILLING Start: 6/28/2001 End: Contractor Name: doyonl @ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyon 19 Rig Number: 19 Sub Phase Description of Operations Date From- To Hours Code Code 7/26/2001 09:30- 11:30 2.00 DRILL TRIP INTRM1 :condition 11:30 - 16:30 5.00 3RILL TRIP INTRM1 Pump 25 bbl dry job - continue trip out f/16,341' to 12,186' - working various tight spots f/14,941' - pulling 45- 55 K over 16:30 - 18:00 1.50 DRILL ClRC INTRM1 Circ and rotate @ 12,186' - circ btms up - did not observe any excessive amount of cuttings at btms up - stood back 1 std 18:00 - 22:30 4.50 DRILL TRIP INTRM1 Continue to trip out f/12,092' - hole still pulling tight - pump & rotate out f/12,092' to 10480' 22:30 - 00:00 1.50 DRILL TRIP INTRM1 Circulate to clean up hole at 550 gpm and 120 rpm, rack 2 stds while circulating, flow check hole before pulling conventionally 7/27/2001 00:00 - 02:30 2.50 DRILL TRIP INTRM1 Flow check and continue trip out of hole conventionally from 10280' to 8360'. Good hole fill, generally pulled good except for a few tight spots at 9815-9720, 9626-9530, & 8480-8390'. Attempt to work past tight spot at 8360' with up to 75,000 overpull, no success and starting having trouble breaking free after pulls 02:30 - 03:00 0.50 DRILL TRIP INTRM1 Back ream past spot at 8360' and attempt to pull conventionally, no go. 03:00 - 11:00 8.00 DRILL TRIP INTRM1 Back ream out from 8360' to 6363' at 420 gpm & 110 rpm - Worked through hole @ 6363' - continue to back ream to 5815' (inside 9 5/8") 11:00- 12:00 1.00 DRILL ClRC INTRM1 Circulate btms up @ shoe - monitor well- static 12:00 - 13:30 1.50 DRILL TRIP INTRM1 Continue trip out f/shoe - pulled 15 stds slow hole trying to swab o hole not taking proper fill - monitor well static 13:30 - 14:00 0.50 DRILL CIRC INTRM1 Circulate btms up - observed large amount of cuttings on btms up - monitor well - static 14:00 - 16:30 2.50 DRILL TRIP INTRM1 Continue pull out of hole to BHA, hole took proper fill 16:30 - 19:00 2.50 DRILL PULD INTRM1 Change out jars, lay down flex collars, lay down BHI Autotrak & bit 19:00 - 20:00 1.00 DRILL PULD INTRM1 Change out saver sub on top drive 20:00 - 21:00 1.00 DRILL RIRD INTRM1 Pull wear bushing, blow down top drive, change out wear sub on test joint & PJSM before BOP test while troubleshooting Top drive IBOP 21:00 - 00:00 3.00 WELCTL BOPE INTRM1 Run test plug and test BOPE to 250 psi Iow & 5000 psi high, annular to 3500 psi 7/28/2001 00:00 - 04:30 4.50 WELCTL BOPE INTRM1 Testing BOP & associated equipment. - 250 psi Iow & 5000 psi high for 5 mins. - Hydril 250 psi Iow & 3500 psi for 5 mins.- Witnessing of test waived by John Spalding AOGCC - pull test plug - set wear bushing 04:30 - 07:00 2.50 DRILL PULD INTRM1 M/U BHA# 5 - load RA source in MWD - make up remaining BHA 07:00 - 09:30 2.50 DRILL TRIP INTRM1 TIH to 5795' - filling pipe every 2000' 09:30 - 11:00 1.50 RIGMNT RURD INTRM1 Cut 120' & slip 60' drill line - adjust brakes - service top drive 11:00 - 14:30 3.50 DRILL TRIP INTRM1 Continue RIH f/5795' to 12,075' filling drill pipe every 2000' 14:30- 15:30 1.00 DRILL CIRC INTRM1 Circulate btms up 15:30 - 18:00 2.50 DRILL TRIP INTRM1 Continue RIH f/12,075 to 17,321' - filling drill pipe every 2000' - took wieght @ 17,321' 18:00 - 23:30 5.50 DRILL REAM INTRM1 Wash and ream thru tight spot at 17,321', continued precautionary wash and ream to bottom while adding Glydril GP at 5% to mud system. Hole packed off once at 17,696' while reaming, took about 30 mins. to clear spot up, otherwise hole looked OK. Had 10.7 ppg mw (up from 9.9 ppg) w/lots of fine cuffings and wall cake. Started I increasing mud weight to 10.4 ppg during last 2 hrs of reaming. Max gas was 615 units 23:30 - 00:00 0.50 DRILL SURV INTRM1 Take base line ECDs and check survey with Anadrill tools 7/29/2001 00:00 - 00:30 0.50 DRILL REAM INTRM1 !Wash & ream f/18598' to 18,620' - adding Glydril @ 5% & weighting up to 10.4 ppg 00:30 - 00:00 23.50 DRILL DRLG INTRM1 Drill 8 12/" hole f/18,620' to 20,082' MD (7195' TVD) :550 gpm, 95-110 rpm, 10-17 K, ADT-14.45 hrs ECD= 12.0-12.4 ppg Printed: 10/16/2001 8:50:59 AM  PHILLIPS ALASKA INC. Page 7 of 9 Operations Summan~ Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 ~Event Name: ROT - DRILLING Start: 6/28/2001 End: Contractor Name: doyonl @ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyon 19 Rig Number: 19 Sub Date From - To Hours Code Code Phase Description of Operations 7/29/2001 00:30 - 00:00 23.50 DRILL DRLG INTRM1 Backream after each stand down at 110-120 rpm. 7/30/2001 00:00 - 10:00 10.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/20,082' to 20,641' TVD 7336' ADT 5.3 hrs 10:00 - 12:00 2.00 DRILL CIRC INTRM1 Circulate & work pipe - 10 bpm @ 1800 psi - repair mud pump #1 12:00 - 22:00 10.00 DRILL DRLG INTRM1 Drill f/20,641' to 21,284' md (7541 tvd) ADT 5.9 hrs 22:00 - 22:30 0.50 DRILL ClRC INTRM1 Drop in return flow& pressure just before connection, trouble shoot pumps, attempted to isolate pump 2, isolation valve washed out. Circulate to clean up hole before shutting down both pumps to repair isolation valve 22:30 - 23:00 0.50 RIGMNT RGRP INTRM1 Repair isolation valve in pump room 23:00 - 00:00 1.00 RIGMNT RGRP INTRM1 Circulate with pump 1 at 420 gpm while troubleshooting pump 2. Discharge Module washed out behind valve seat. Start replacement of discharge module. 7/31/2001 00:00 - 01:00 1.00 RIGMNT RGRP INTRM1 Circulate at 21284 at 420 gpm w/one pump, rotate at 120 rpm, reciprocate, while replacing fluid end module on pump # 2 01:00 - 06:00 5.00 RIGMNT RGRP INTRM1 Circulate at 420 gpm, rotate at 100 rpm and set back stands at 1/2 hr per connection to 20700, while repairing pump # 2 06:00 - 07:30 1.50 RIGMNT RGRP INTRM1 Circulate at 340 gpm, rotate & run in stands, at 1/2 hr per connection to 20,900' 07:30 - 08:30 1.00 DRILL TRIP INTRM1 Continue in hole w/both pumps to 21284 08:30 - 11:00 2.50 DRILL DRLG INTRM1 Drill 21,284 to 21,464' (7575' TVD) ADT - 1.6 hrs 11:00 - 14:00 3.00 DRILL ClRC INTRM1 Pump hi vis sweep at 550 gpm, 2660 psi, rotate at 120 rpm and reciprocate until sweep out of hole and shakers cleaning up 14:00 - 17:30 3.50 DRILL TRIP INTRM1 Check flow, POOH backream out of hole from 21464' to 20630' at 120 rpm,550 gpm 17:30 - 00:00 6.50 DRILL TRIP INTRM1 Back reaming out of hole slowly, working tight hole from 20,630' to 20,078'. 420 gpm, 110 rpm 8/1/2001 00:00 - 02:30 2.50 DRILL TRIP INTRM1 Backream out from 20078' to 19910' @ 30 min per stand, 10 bpm, 120 rpm, hole packed off. 02:30 - 12:00 9.50 DRILL TRIP INTRM1 Worked to regain circ, unable to pump above 3.5 bpm without packing off. worked pipe up from 19910' to 19614', unable to work down without packing off. 12:00 - 22:00 10.00 DRILL TRIP INTRM1 Established full rate with pumps, circ BU @ 13 bpm 2570 psi. Worked pipe from 19614' to 19707' with 120 rpm. After BU hole continued to packoff. Backreamed out from 19614' to 19315', intermitant hole packoff throughout. 22:00 - 00:00 2.00 DRILL TRIP INTRM1 CBU while Backreaming from 19315' to 19200' 13 bpm/2550 psi, hole conditions improving. 8/2/2001 00:00 - 09:30 9.50 DRILL TRIP INTRM1 Backream from 19200' to 18125' 20-30 min/stand 13 bpm, 120 rpm. 09:30 - 11:30 2.00 DRILL TRIP INTRM1 POH from 18125' to 17206', 40-60k over. 11:30 - 12:15 0.75 DRILL TRIP INTRM1 Backream and work through tight spot @ 17206', 13 bpm 120rpm. 12:15 - 14:00 1.75 DRILL TRIP INTRM1 POH from 17150' to 15880' 40-60k over. 14:00 - 14:30 0.50 DRILL TRIP INTRM1 Backream through tight spots from 15880' to 15830', 13 bpm 120 rpm. 14:30 - 18:00 3.50 DRILL TRIP INTRM1 POH from 15830' to 14880' 40-75k over, pulled into tight spot @ 14880', jarred pipe free down (15 min). Backream from 14900' to 14840' 13 bpm 120 rpm (30) min. POH from 14840' to 14600' 40-70k over pulled into tight spot @ 14600'. Jarred pipe free down (40) min. 18:00 - 20:00 2.00 DRILL TRIP INTRM1 Backream from 14600' to 14510', worked stuck pipe free jarring down @ 14510'. Backream from 14510' to 14433' with 13 bpm @ 2010 psi / 120 rpm. 20:00 - 22:00 2.00 DRILL TRIP INTRM1 Backream from 14433' to 13879' ( 1000'-2000' fph). 22:00 - 22:15 0.25 DRILL TRIP INTRM1 Attempt to POH could not pass 13788' with 50k overpull-hole sticky. 22:15 - 00:00 1.75 DRILL TRIP ~INTRM1 Continue backreaming from 13879' to 13217' (1000 to 2000 fph). 8/3/2001 00:00 - 02:15 2.25 DRILL TRIP INTRM1 Backream from 13217' to 12261' @ 1000-2000 fph, (slowed to 200 fph Printed: 10/16/2001 8:50:59AM  PHILLIPS ALASKA INC. Page 8 of 9 Operations Summary Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT- DRILLING Start: 6/28/2001 End: Contractor Name: doyonl @ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyon 19 Rig Number: 19 Sub Date From- To Hours Code Code Phase Description of Operations 8/3/2001 00:00 - 02:15 2.25 DRILL TRIP INTRM1 from 12700' to 12580' due to string overpull and torgue) 13 bpm @ 2000 psi, 120 rpm. 02:15 - 02:30 0.25 DRILL TRIP INTRM1 !Attemted to pull pipe, could not pass 12200' with 50k overpull. 02:30 - 04:00 1.50 DRILL TRIP INTRM1 I Backream from 12261' to 11672', 13 bpm @ 1990 psi, 120 rpm. 04:00 - 04:30 0.50 DRILL TRIP INTRM1 Pipe stuck @ 11672', jarred down to free pipe. 04:30 - 05:00 0.50 DRILL TRIP INTRM1 Backream from 11672' to 11595' 13 bpm @ 1990 psi, 120 rpm. 05:00 - 06:30 1.50 DRILL TRIP INTRM1 Unable to break out stand with Top Drive, circ and reciprocate pipe, repair Top Drive reverse contactors in SCR house. 06:30 - 14:00 7.50 DRILL TRIP INTRM1 Backream fro 1595' to 8644', 13 bpm @ 1900 psi, 125 rpm. Average pulling speed 1200-2000 fph, slowed rate to 100-200 fph intermitedly when overpull and torgue increased. 14:00 - 14:15 0.25 DRILL TRIP INTRM1 POH from 8644' to 8400', over pull gradually increasing to 45k last 40' pulled. 14:15 - 19:30 5.25 DRILL TRIP INTRM1 Backreamed from 8450' to shoe, 13 bpm @ 1800 psi, 125 rpm. Average pulling speed 1500-2000 fph, slowed through numerous tight spots. 19:30 - 20:30 1.00 DRILL TRIP INTRM1 Pumped 40 bb112.4 ppg high vis sweep, 16 bpm 2600 psi, 130 rpm. 20:30 - 23:00 2.50 DRILL TRIP INTRM1 POH to BHA, no problems. 23:00 - 00:00 1.00 DRILL TRIP INTRM1 Stand back hwdp and jars, remove source from LWD. 8/4/2001 00:00- 02:00 2.00 DRILL I PULD INTRM1 Finish removing source from LWD tools. POOH & lay down MWD/ LWD, mud motor, & bit. **Clamp on stabalizer on CDR tool and intergal centralizer above motor ~acked with cuttings.** 02:00 - 04:00 2.001 RIGMNT RSRV INTRM1 Perform PM on top drive. (Check saver sub; change torque wrench dies; lub; etc.) 04:00 - 06:00 2.00 RIGMNT RGRP INTRM1 Disassemble & repair torque wrench on top drive. (Grabber Arm and Die Retainer.) 06:00 - 10:00 4.00 CEMEN'r TRIP INTRM1 Pick up 3-1/2" DP stinger & mule shoe (2256'). RIH to 5777'. 10:00 - 11:00 1.00 RIGMNT RURD INTRM1 Slip & cut 80' of drlg line. 11:00 - 12:30 1.50 RIGMNT RGRP INTRM1 Install shims on guide rail dolly rollers to align top drive more over hole. 112:30 - 23:00 10.50 CEMEN'[ TRIP . INTRM1 RIH with 3-1/2" DP stinger on 5" DP. Wash & ream 56' to bttm. 23:00 - 00:00 1.00 CEMEN'I' ClRC INTRM1 Pump 40 bbls of weighted viscous pill. Circ & cond mud/hole prior to setting P&A plug #1. (13 bpm; 120 rpm; 2760 psi PP) (NOTE: Contacted AOGCC & received permission to extend BOPE test until prior to RIH to sidetrack just below surface csg shoe.) 8/5/2001 00:00 - 02:30 2.50 CEMEN'I' ClRC INTRM1 Pump a 40 bbl weighted high vis pill. Circ & cond mud/hole for cementing. (Had fine gummy shale from hole over shakers while circulating B/U, but prior to the pill coming to surface. Mud wt out while circulating B/U was as high as 10.8 ppg.) 02:30 - 04:30 2.00 CEMEN'[ TRIP INTRM1 Made a 10 stand short trip, prior to cementing, to check hole tripping condition. 04:30 - 06:00 1.50 CEMEN'r PLUG INTRM1 Hold prejob JSA. R/U & pressure test cementing lines. Set a balanced P&A plug from 21454' to 20790'. (47.7 bbls, 15.8 ppg, "G" cement.) 06:00 - 07:00 1.00 CEMEN'I TRIP INTRM1 :POOH to top of P&A plug #1. 07:00 - 09:00 2.00 CEMEN'i ClRC INTRM1 Circ and cond mud @ 20790', 13 bpm @ 2820 psi, 70 rpm.Wash down to 20883'. PJSM. 09:00 - 10:15 1.25 CEMEN'I PLUG INTRM1 RU and test lines to 3000 psi, plugged back 8-1/2" openhole from 120883' with 52 bbls of 15.8 ppg cement, displaced to eqaulization, CIP @ 1007 hrs. ETOC 20340' (w/25% washout). 10:15- 12:00 1.75 CEMEN'I'PLUG INTRM1 POH to 19025'. 12:00 - 12:30 0.50 CEMEN'I INTRM1 Circ to clean drill pipe, monitor well, static. Pump dry job. 12:30 - 18:00 5.50 CEMEN'I'TRIP INTRM1 POH from 19025' to 6535', no problems. Printed: 10/16/2001 8:50:59AM  PHILLIPS ALASKA INC. Page 9 of 9 Operations Summary Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT- DRILLING Start: 6/28/2001 End: 'Contractor Name: doyonl @ppco.com Rig Release: 9/1/2001 Group: :Rig Name: Doyon 19 Rig Number: 19 Sub Phase Description of Operations Date From-To Hours Code Code 8/5/2001 18:00 - 19:30 1.50 CEMEN'I ClRC INTRM1 CBU, pump 60 bbls of 13.0 ppg high vis pill, displace to equalization. = Pulled up to 6250'. 19:30 - 20:00 0.50 CEMEN'I ClRC INTRM1 Circ and cond mud for cementing. PJSM. 20:00 - 21:00 1.00 CEMEN'I'PUMP INTRM1 Plugged back 8-1/2" open hole and 9-5/8" casing from 6250' with 490 sxs of 17.0 ppg slurry, displaced to equalization. 21:00 o 21:30 0.50 CEMEN'I'TRIP INTRM1 Pulled to 5677', slowly. 21:30 o 22:00 0.50 CEMEN-I'ClRC INTRM1 CBU, dumped 45 bbls of cement contaminated mud. 22:00 - 00:00 2.00 CEMEN'I'TRIP INTRM1 POH, laying down 5" drill pipe. Printed: 10/16/2001 8:50:59AM ANADRILL SCHLUMBERGER Survey report 31-Jul-2001 13:56:22 Page 1 of 9 Client ................... : Phillips Alaska Inc. Field .................... : Coville River Well ..................... : CD2-33 API number ........... ~,..: 50-103-20381-00 Engineer ................. :'DammeYer COUNTY: .................. : Doyon 19 STATE: ................... : Alaska Ail surveys are IFRR corrected by Sperry Sun Surveys from 5895-18576 ft provided by BHI Spud date ................ : 07-Jun-2001 Last survey date ......... : 31-Jul-01 Total accepted surveys...: 229 MD of first survey ....... : 0.00 ft MD of last survey ........ : 21464.00 ft Survey calculation methods- Method for positions ..... : Minimum curvature Method for DLS ........... : Mason & Taylor Depth reference Permanent datum .......... : MEAN SEA LEVEL .Depth reference .......... : Drill Floor GL above permanent ....... : 15.90 ft KB above permanent..- ..... : DF above permanent ....... : 52.05 ft Vertical section origin Latitude (+N/S-) ......... : Departure (+E/W-) ........ : 0.00 ft 0.00 ft' Platform reference point--- Latitude (+N/S-) ......... : -999.25 ft Departure (+E/W-) ........ : -999.25 ft Azimuth from rotary table to target: -248.30 degrees Geomagnetic data Magnetic model ........... : BGGM version 2000 Magnetic date ............ : 07-Jul-2001 Magnetic field strength..: 1147.17 HCNT Magnetic dec (+E/W-) ..... : 25.34 degrees Magnetic dip ............. : 80.54 degrees MWD survey Reference Criteria Reference G .............. : 1002.68 mGal Reference H .............. : 1147.17 HCNT Reference Dip ............ : 80.54 degrees Tolerance of G ........... : (+/-) 2.50 mGal Tolerance of H ........... : (+/-) 6.00 HCNT Tolerance of Dip ......... : (+/-) 0.45 degrees .. Corrections Magnetic dec (+E/W-) ..... : 25.34 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) .... : 25.34 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N) ..... -...: No degree: 0~00 [.(c)2001 Anadrill IDEAL ID6_iC_08] ANADRILL SCHLUMBERGER Survey Report Seq MeasUred Incl Azimuth Course # depth angle angle length - (ft) (deg) ' (deg) (ft) 1 0.00 0.00 0.00 2 114.00 0.00 0.00 3 225.00 0.23 137.62 4 319.00 0.32 168.89 5 411.00 0.78 227.06 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 501.00 2.18 241.69 591.00 3.44 234.82 683.00 4.67 249.99 766.00 5.05 257.79 856.00 6.33 259.49 945.40 1034.00 1129.00 1223.00 1320.00 1414.00 1510.00 1604.00 1699.00 1795.00 1890.00 1985.00 2080.00 2175.00 2269.00 6.69 258.18 6.39 258.78 8.07 258.46 9.35 256.53 10.50 257.59 0.00 114.00 111.00 94.00 92.00 90.00 90.00 92.00 83.00 90.00 89.40 88.60 95.00 94.00 97.00 TVD depth (ft) 0.00 114.00 225.00 319.00 410.99 500.96 590.85 .682.62 765.33 854.88 943.70 1031.73 1125.97 1218.88 1314.43 13.19 257.58 94.00 1406.42 15.63 254.25 96.00 1499.39 17.47 248.07 94.00 1589.50 19.56 246.91 95.00 1679.58 21.95 247.39 96.00 1769.34 95.00 95.00 95.00 95.00 94.00 94.00 97.00 95.00 95.00 94.00 245.97 246.'77 248.50 251.60 251.05 24.85 27.10 29.40 31.59 33.29 2363.00 35.39 2460.00 38.12 2555.00 41.28 2650.00 44.01 2744.00 46.50 251.83 250.28 246.82 246.17 244.34 1856.52 1941.92 2025.60 2107.46 2186.79 2264.40 2342.11 2415.21 2485.08 2551.25 31-Jul-2001 13:56:22 Vertical section (ft) 0.00 0.00 -0.08 -0.10 0.53 2.81 7.t3 13.56 20.54 29.31 39.28 49.21 60.97 75.03 91.55 110.59 134.27 160.97 191.13 225.15 262.85 304.43 349.39 397.56 447.91 500.85 558.82 619.47 683.79 750.45 Displ +N/S- (ft) Displ +E/W- (ft) 0.00 0.00 -0.16 -0.56 -1.24 -2.47 -4.84 -7.71 -9.64 -11.38 -13.35 -15.36 -17.73 -20.82 -24.56 -28.71 -34.57 -43.28 -54.85 -68.05 -83.01 -99.67 -116.76 -133.16 -149.31 -166.18 -185.04 -207.28 -232.95 -260.91 0.00 0.00 0.15 0.33 -0.08 -2.04 -5.75 -11.53 -18.27 -27.02 -36.96 -46.85 -58.57 -72.46 -88.76 -107.60 -130.75 -156.03 -183.89 -215.24 -249.87 -287.99 -329.57 -374.89 -422.65 -472.92 -527.80 -584.23 -643.24 -703.86 Page Total displ (ft) At Azim (deg) 0.00 0.00 0.22 0.65 1.24 3.20 7.51 13.87 20.66 29.32 39.30 49.31 61.20 75.40 92.09 111.36 135.24 161.92 191.89 225.74 263.29 304.75 349.64 397.83 448.25 501.27 559.30 619.91 684.13 750.66 0.00 0.00 137.62 149.72 183.74 219.51 229.93 236.22 242.19 247.16 250.15 251.85 253.16 253.97 254.53 255.06 255.19 254.50 253.39 252.46 251.62 250.91 250.49 250.45 250.54 250.64 250.68 250.47 250.09' 249.66 2 of 9 DLS (deg/ i00f) 0.00 0.00 0.21 0.18 0.73 1.60 1.45 1.76 0.92 1.43 0.44 0.35 1.77 1.40 1.20 2.86 2.68 2.71 2.23 2.50 3.11 2.40 2.57 2.84 1.84 2.28 2.97 4.06 2.91 2.99 Srvy tool type TIP MWD MWD MWD MWD Tool qual type [ (c) 2001 Anadrill IDEAL ID6_iC_08] ANADRILL SCHLUMBERGER Survey Report 31-Jul-2001 13:56:22 Page 3 of 9 Seq -- 31 32 33 34 35 36 37 38 39 4O 41 42 43 44 45 Measured depth (ft) 2841.00 2937.00 3032.00 3128.00 3221.00 3316.00 3410.00 3508.00 3602.00 3696.00 3794.00 3889.00 3984.00 4076.00 4171.00 46 4267.00 47 4361.00 48 4457.00 49 4551.30 50 4647.00 Incl- Azimuth Course angle angle length (deg) (deg) (ft) 49.88 243.17 97.00 53.48 245.17 96.00 54.98 247.49 95.00 57.93 247.70 96.00 60.51 248.04 93.00 62.99 248.74 66.33 249.74 67.44 250.08 69.73 249.35 72.02 249.37 73.58 249.62 74.27 250.29 74.75 249.62 75~10 248.83 75.65 248.30 76.00 247.43 75.85 248.62 75.16 248.38 74.53 248.32 73.95 24'8.05 95.00 94.00 98.00 94.00 94.00 98.00 95.00 95.00 92.00 95.00 96.00 94.00 96.00 94.30 95.70 ' 51 4743.00 73.18 247.69 96.00 52 4839.00 73.71 247.22 96.00 53 4933.00 74.48 247.83 94.00 54 5027.00 74.94 249.66 94.00 55 5123.00 75.05 249.20 96.00 TVD Vertical Displ depth section +N/s- (ft) (ft) (ft) 56 5219.00 57 5314.00 58 5410.00 59 5504.00 60 5600.00 2615~91 2675.42 2730.96 2784.00 2831.59 2876.55- 2916.78 2955.25 2989.57 3020.36 3049.34 3075.65 3101.02 3124.95 3148.93 3172.44 3195.30 3219.33 3243.99 3269.98 3297.14 3324.49 3350.25 3375-.04 3399.90 75.07 249.52 .96.00 3424.65 75.22 250.07 95.00 3449.00 75.02 250.01 96.00 3473.66 74.77 251.14 94.00 3498.15 75.40 249.67 96.00 3522.86 Displ +E/W- (ft) Total displ (ft) At Azim (deg) 822.51 -292.90 -768.68 897.61 -325.68 -836.47 974.64 -356.60 -907.06 1054.63 -387.09 -981.03 1134.52 -417.19 -1055.04 822.59 897.64 974.64 1054.64 1134.53 249.14 248.73 248.54 248.47 248.42 1218.20 1303.13 1393.23 1480.70 1569.49 -448.00 -1132.83 -478.10 -1212.27 -509.06 -1296.91 -539.40 -1378.99 -570.70 -1462.09 1218.20 1303.14 1393.24 1480.73 1569.53 248.42 248.48 248.57 248.64 248.68 1663.09 1754.33 1845.84 1934.67 2026.59 .-603.49 -1549.78 -634.78 -1635.53 -666.16 -1721.53 -697.67-1804.59 -731.26 -1890.15 1663.13 1754.40 1845.93 1934.76 2026.68 248.72 248.79 248.85 248.86 248.85 2119.66 2210.83 2303.7-8 2394.80 2486.90 -766.33 '1976.37 -800.45 -2060.92 -834.51 -2147.40 -868.10 -2232.00 -902.32 -2317.50 2578.97 -937.01 -2402.80 2670.98 -972.29 -2487.78 2761.37 -1006.85 -2571.32 2119.74 2210.91 2303.85 2394.87 2486.97 2579 03 2671.03 2761.42 2852.04 -1039.71 -2655.82 2852.08 2944.75 -1072.29 -2742.63 2944.80 3037~.49 -1104.99 -2829.44 3037.55 3129.28 -1136.70 -2915.61 3129.36 3222.02 -1168.37 -3002.82 3222.11 3312.70 -1198.56 -3088.40 3312.82 3405.40 -1229.67 -3175.79 3405.54 248.81 248.77 248.76 248.75 248.73 248.70 248.65 248.62 248.62 248.65 248.67 248.70 248.74 248.79 248.83 DLS (deg/ i00f) 3.60 4.09 2.53 3.08 2.79 2.69 3.68 1.18 2.54 2.44 1.61 0.99 0.85 0.91 0.79 0.95 1.24 0.76 0.67 0.66 0.88 0.72 1.03 1.94 0.48 0.32 0.58 0.22 1.19 1.62 Srvy tool type Tool qual type [(c)2001 Anadrill IDEAL ID6_iC_08] ANADRILL SCHLUMBERGER Survey Report 31-Jul-2001 13:56:22 Page 4 of 9 Seq Measured % depth - (ft) 61 5694.00 62 5777.00 63 5895.00 64 5991.00 65 6086.00 Incl Azimuth angle angle (deg) (deg)' 75.94 250 16 76.14 250.68 75.56 251.27 73.11 252.03 73.42 252.85 COurse length (ft) 94.00 83.00 118.00 96.00 95.00 66 6181.00 67 6277.00 68 6372.00 69 6467.00 70 6562.00 71 6657.00 72 6753.00 73 6847.00 74 6942.00 75 7038.00 76 7133.00 77 7228.00 78 7323.00 79 7418.00 80 7513.00 73.58 252.65 73.65 252.69 74.10 253.18 74.03 251.28 75.24 250.06 76.06 248.23 76.51 247.76 77.20 248.07 77.51 248.35 77.86 248.24 77.14 247.47 75.97 246.89 75.94 247.03 76.19 247.83 76.13 246.79 81 7608.00 76.13 82 7703.00 75.97 83 7798.00 75.97 84 7894.00 76.16 85 7989.00 76.22 86 8083.00 76.16 87 8178.00 76.13 88 8273.00 76.10 89 8368.00 75.84 90 8463.00 75.52 246.21 245-37 245.74 246.04 245.92 246.05 245.94 245.48 244.69 244.74 95.00 96.00 95.00 95.00 95.00 95.00 96.00 94.00 95.00 96.00 95.00 95.00 95.00 95.00 95.00 95.00 95.00 95.00 96.00 95.00 94.00 95.00 95.00 95.00 95.00 TVD Vertical Displ Displ Total At depth section +N/S- +E/W- displ Azim (ft) (ft) (ft) '(ft) (ft) (deg) 3546.13 3566.15 3595.00 3620.92 3648.27 3675.25 3702.33 3728.72 3754.80 3779.98 3803.52 3826.28 3847.66 3868.46 3888.93 3909.49 3931.58 3954.64 3977.52 4000.24 4023.02 4045.92 4068.95 4092.07 4114.74 4137.18 4159.93 4182.73 4205.76 4229.26 3496.44 -1260.94 -3261.33 3576.93 -1287.94 -3337.22 3691..22 -1325.24 -3445.39 3783.49 -1354.34 -3533.11 3874.23 -1381.78 -3619.85 3965.04 -1408.80 -3706.84 4056..88 -1436.23 -3794.76 4147.84 -1463.01 -3882.00 4238.97 -1490.89 -3968.99 4330.49 -1521.21 -4055.43 4422.51 -1553.98 -4141.43 4515.77 -1588.92 -4227.89 4607.31 -1623.34 -4312.71 4700.00 -1657.75 -4398.79 4793.79 -1692.43 -4485.93 4886.54 -1727.39 -4571.83 4978.91 -1763.23 -4657.00 5071.05 -1799.30 -4741.81 5163.24 -1834.68 -4826.95 5255.47 -1870.27 -4912.05 5347.65 -1907.04 -4996.63 5439.76 -1944.85 -5080.72 5531.82 -1982.99 -5164.62 5624.91 -2021.05 -5249.67 5717.09 -2058.60 -5333.93 5808.30 -2095.75 -5417.31 5900.46 =2133~28 -5501.57 5992 59 -2171.21 -5585.63 6084.61 -2210~04 -5669.22 6176.48 -2249 36 -5752.45 3496.60 3577.12 3691.47 3783.80 3874.61 248.86 248.90 248.96 249.03 249.11 3965.52 249.19 4057.46 249.27 4148.54 249.35 4239.77 249.41 4331.35 249.44 4423.38 249.43 4516.61 249.40 4608.12 249.37 4700.79 249.35 4794.57 249.33 4887.28 249.30 4979.62 249.26 5071.70 249.22 5163.86 249.19 5256.05 249.16 5348.19 249.11 5440.23 249.05 5532.23 249.00 5625.27 248.94 5717.40 248.90 DLS (deg/ I00f) 0.76 0.65 0.69 2.66 0.89 0.26 0.08 0.69 1.92 1.78 2.06 0.67 0.80 0.43 0.38 1.10 1.37 0.15 0.86 1.06 0.59 0.87 0.38 0.36 0.14 5808.57 248.85 0.15 5900.69 248.81 0.12 5992.78 248.76 0.47 6084.76 248.70' 0.85 6176.59 248.64 0.34 Srvy tool type MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M Tool qual type [ (c) 2001 Anadrill IDEAL ID6_1C_08] ANADRILL SCHLUMBERGER Survey RepOrt 31-Jul-2001 13:56:22 Page 5 of 9 Seq -- 91 92 93 94 95 Measured depth (ft) 8558.00 8653.00 8749.00 8844.00 8940.00 96 9035.00 97 9130.00 98 9225.00 99 9320.00 100 9415.00 101 9511.00 102 9606.00 103 9701.00 104 9796.00 105 9891.00 106 9986.00 107 10081.00 108 10177.00 109 10272.00 110 10368.00 Incl- Azimuth Course TVD angle angle length depth (deg) (deg) (ft) (ft) 75.62 245.46 95.00 75.57 245.36 95.00 75.68 246.63 96.00 75.59 247.34 95.00 75.78 247.22 96.00 75.46 247.96 95.00 75.59 248.88 95.00 75.24 248.29 95.00 75.31 249.04 95.00 75.53 249.42 95.00 75.65 75.62 75.49 75.46 75.44 75.46 75.59 75.46 75.53 75.49 248.76 249.62 248.08 247.01 246.30 246.57 246.68 246.41 246.38 246.64 111 10463.00 75.41 247.57 112 10558.00 75.40 247.38 113 10654.00 75.50 247.27 114 10749.00 75.46 247.80 115 10843.00 75.17 247.77 116 10939.00 117 11034.00 118 11129.00 119 11224.00 120 11319.00 96.00 95.00 95.00 95.00 95.00 95.00 95.00 96.00 95.00 96.00 95.00 95.00 96.00 95.00 94.00 75.40 247.66 96.00 75.31 247.65 95.00 75.31 248.16 95.00 75.52 248.87 95.00 75.59 249.22 95.00 4252.93 4276.57 4300.40 4323.97 4347.71 4371.30 4395.05 4418.97 4443.12 4467.03 4490.92 4514.49 4538.19 4562.02 4585.88 4609.75 4633.50 4657.49 4681.29 4705.31 4729.17 4753.11 4777.23 4801.05 4824.88 4849.26 4873.28 4897.37 4921.30 4944.99 Vertical Displ section +N/S- (ft) (ft) Displ +E/W- (ft) 6268.34 -2288.09 6360.23 -2326.38 6453.15 -2364.21 6545.16 -2400.19 6638.16 -2436.12 -5835.90 -5919.57 -6004.52 -6089.22 -6175.02 6730.18 -2471.20 6822.16 -2505.03 6914.10 -2538.60 7005.97 -2572.03 7097.90 -2604.63 -6260.09 -6345.63 -6431.22 -6516.80 -6602.77 7190.87 -2637.82 7282.89 -2670.51 7374.88 -2703.70 7466.83 -2738.83 7558.75 -2775.27 7650.65 -2812.03 7742.60 -2848.52 7835.51 -2885.52 7927.43 -2922.35 8020.33 -2959.40 8112.26 -2995.17 8204.18 -3030.39 8297.09 -3066.21 8389.05 -3101.35 8479.98 -3135.73 -6689.62 -6775.65 ~6861.45 .~6946.44 -7030.86 '7115.15 -7199.58 -7284.85 -7369.13 -7454.37 -7539.08 -7624.00 -7709.74 -7794.73 -7878.91 8572.'82 -3170.94 8664.73 -3205.88 8756.62 -3240.45 8848.56 -3274.12 8940.55 -3307.02 -7964.82 -8049.83 -8134.98 -8220.53 -8306.44 Total displ (ft) At Azim (deg) 6268.42 6360.29 6453.19 6545.19 6638.19 248.59 248.55 248.51 248.49 248.47 6730.20 6822.18 6914.12 7006.00 7097.93 248.46 248.46 248.46 248.46 248.47 7190.91 7282.93 7374.92 7466.87 7558.78 248.48 248.49 248.49 248.48 248.46 7650.67 7742.61 7835.52 7927.43 8020.33 248.44 248.41 248.39 248.37 248.35 8112.26 8204.19 8297.09 '8389.05 8479.98 248.33 248.32 248.31 248.30 248.30 8572.82 8664.73 8756.62 '8848.56 8940.55 248.29 248.28 248.28 248.28 248.29 DLS (deg/ 100f) 0.74 0.11 1.29 0.73 0.23 0.83 0.95 0.70 0.77 0.45 0.68 0.88 1.58 1.09 0.72 0.28 0.18 0.30 0.08 0.27 0.95 0.19 0.15 0.54 0.31 0.26 0.10 0.52 0.76 0.36 Srvy tool type MWD_M MWD_M MWD_M MWD_M Tool c/ual type [ (c) 2001 Anadrill IDEAL ID6_iC_08] ANADRILL SCHLUMBERGER Survey Report Seq' Measured Incl Azimuth 9 depth angle angle - (ft) (deg). (deg) 121 11414.00 75.53 249.26 122 11510.00 75.18 248.87 123 11605.00 75.34 249.71 124 11700.00 75.46 251.32 125 11795.00 75.58 251.62 126 11890.00 127 11985.00 128 12080.00 129 12176.00 130 12271.00 131 12366.00 132 12461.00 133 12556.00 134 12652.00 135 12746.00 75.49 250.82 75.37 250.36 75.40 249.00 75.30 248.24 75.43 248.29 75.53 248.01 75.59 248.03 75.24 246.94 75.27 247.82 75.31 247.12 136 12842.00 75.24 247.40 137 12937.00 75.34 247.54 138 13033.00 75.21 247 43 139 13128.00 75.37 248.08 140 13223.00 75.21 248.13 141 13319.00 142 13414.00 143 13509.00 144 13604.00 145 13699.00 75.15 75.36 75.19 75.24 75.43 146 147 148 149 150 13794.00 75.21 13889.00 75.27 13984.00 75.18 14079.00 75.12 14174.00 75.21 249 ~76 249.61 250.25 249.28 248.36 247.82 247.81 247.49 247.98 Course length (ft) 95.00 96.00 95.00 95.00 95.00 95.00 95.00 95.00 96.00 95.00 95.00 95.00 95.00 96.00 94.00 96.00 95.00 96.00 95.00 95.00 96.00 95.00 95.00 95.00 95.00 95.00 95.00 95.00 95.00 ~95.00 31-Jul-2001 13:56:22 Page TVD Vertical Displ Displ Total At depth section +N/S- +E/W- displ Azim (ft) (ft) (ft) (ft) (ft) (deg) 4968.68 4992.96 5017.13 5041.07 5064.83 5088.56 5112.46 5136.43 5160.71 5184.71 5208.53 5232.22 5256.14 5280.58 5304.45 5328.85 5352.97 5377.37 5401.50 5425.62 5450.17 5474.35 5498.50 5522.75 5546.80 5570.87 5595.08 5619.30 5643.65 5667.97 9032.53 -3339.63 -8392.47 9125.41 -3372.82 -8479.22 9217.27 -3405.31 -8565.15 9309.13 -3435.97 -8651.82 9400.97 -3465.20 -8739.03 9032.53 9125.41 9217.27 9309.13 9400.97 248.30 248.31 248.32 248.34 248.37 9492.84 -3494.82 -8826.12 9584.71 -3525.37 -8912.84 9676.60 -3'557.30 -8999.04 9769.48 -3591.15 -9085.53 9861.40 -3625.19 -9170.91 9492.85 9584.73 9676.63 9769.51 9861.42 248.40 248.42 248.43 248.43 248.43 9953.36 -3659.42 -9256.27 9953.39 10045.36 -3693.-85 -9341.58 10045.38 10137.29 -3729.06 -9426.51 10137.31' 10230.11 -3764.76 -9512.21 10230.13 10321.02 -3799.60 -9596.19 10321.04 248.43 248.43 248.42 248.41 248.40 10413.85 -3835.49 -9681.82 10413.87 10505.73 -3870.70 -9766.69 10505.74 10598.57 -3906.25 -9852.46 10598.58 10690.45 -3941.04 -9937.51 10690.46 10782.33 -3975.30 -10022.77 10782.34 248.39 248.38 248.37 248.37 248.37 10875.14 -4009.58 -10109.01 10875.15 10967.00 -4042.29 -10194.86 10967.01 11058.85 -4074.19 -10281.02 11058.87 11150.67 -4105.71 -10367.30 11150.69 11242.54 -4137.50 -10453.53 11242.56 248.37 248.37 248.38 248.40 248.41 11334.44 -41'70.70 -10539.22 11334.46 248.41 11426.30 -4204.98 -10624.45 11426.32 248.41 11518~16 -4239.67 -10709.51 11518.18 248.40 11609.98 -4274.59 ~10794.44 11610.00 248.40 11701.81 -4309.38 -10879.43 11701.82 248.39 6 of 9 DLS (deg/ 100f) 0.08 0.54 0.87 1.64 0.33 0.82 0.49 1.39 0.77 0.15 0.30 0.07 1.17 0.89 0.72 0.29 0.18 0.17 0.68 0.18 0.40 1.28 0.24 0.65 1.01 0.97 0.55 0.10 0.33 0.51 Srvy tool type MWD_M MWD_M MWD_M MWD_M MWD_M Tool qual type [ (c) 2001 Anadrill. IDEAL ID6_iC_08] AND/DRILL scHLUMBERGER Survey Report- 31-Jul-2001 13:56:22 Page 7 of 9 Seq -- Measured Incl' Azimuth Course depth angle angle length (ft) (deg) (deg) (ft) TVD Vertical Displ Displ Total depth section +N/S- +E/W- displ (ft) (ft) (ft) (ft) (ft) At DLS Srvy Tool Azim (deg/ tool qual (deg) 100f) type type 151 14269.00 75.41 246.73 95.00 5692.07 11793.69 -4344.76 -10964.23 11793.70 248.38 1.29 MWD_M 152 14364.00 75.27 246.51 95.00 5716.11 11885.56 -4381.23 -11048.60 11885.57 248.37 0.27 MWD_M 153 14459.00 75.28 247.25 95.00 5740.26 11977.41 -4417.31 -11133.10 11977.41 248.36 0.75 MWD_M 154 14555.00 75.18 247.17 96.00 5764.73 12070.22 -4453.27 -11218.68 12070.22 248.35 0.13 MWD_M 155 14651.00 75.53 247~45 96.00 5789.00 12163.09 -4489.09 -11304.37 12163.09 248.34 0.46 MWD_M 156 14745.00 75.56 247.68 94.00 5812.47 12254.10 -4523.83 -11388.50 12254.10 248.34 0.24 MWD_M 157 14841.00 75.24 247.70 96.00 5836.67 12347.00 -4559.10 -11474.45 12347.00 248.33 0.33 MWD_M 158 14936.00 75.37 248.18 95.00 5860.76 12438.89 -4593.61 -11559.61 12438.89 248.33 0.51 MWD_M 159 15031.00 75.31 248.31 95.00 5884.81 12530.79 -4627.68 -11644.98 12530.80 248.33 0.15 MWD_M 160 15126.00 75.15 248.77 95.00 5909.03 12622.65 -4661.28 -11730.47 12622.66 248.33 0.50 MWD_M 161 15221.00 75.15 248.66 95.00 5933.37 12714.48 -4694.62 -11816.03 12714.48 248.33 0.11 MWD_M 162 15317.00 75.34 249.45 96.00 5957.82 12807.30 -4727.80 -11902.73 12807.31 248.34 0.82 MWD_M 163 15412.00 75.09 248.74 95.00 5982.07 12899.15 -4760.58 -11988.54 12899.15 248.34 0.77 MWD_M 164 15507.00 75.43 248.87 95.00 6006.24 12991.02 -4793.79 -12074.20 12991.02 248.35 0.38 MWD_M 165 15602.00 75.19 247.55 95.00 6030.33 13082.91 -4827.90 -12159.52 13082.92 248.34 1.37 MWD_M 166 1569'8.00 75.05 246.53 96.00 6054.98 13175.67 -4864.10 -12244.95 13175 67 248.34 1.04 MWD_M 167 15793.00 75.12 246.24 95.00 6079.44 13267.42 -4900.87 -12329.06 13267.42 248.32 0.30 MWD_M 168 15888.00 75.31 245.78 95.00 6103.68 13359.20 -4938.22 -12412.98 13359.20 248.31 0.51 MWD_M 169 15983.00 75.31 245.08 95.-00 6127.77 13450.98 -4976.43 -12496.56 13450.98 248.29 0.71 MWD_M 170 16078.00 75.08 245.73 95.00 6152.04 13542.71 -5014.65 -12580.07 13542.71 248.27 0.70 MWD_M 171 16173.00 75.40 247.54 95.00 6176.25 13634.53 -5051.08 -12664.40 13634.53 248.26 1.87 MWD_M 172 16269.00 75.12 246.73' 96.00 6200.68 13727.35 -5087.16 -12749.94 13727.35 248.25 0.87 MWD_M 173 16364.00 75.10 245.81 95.00 6225.09 13819.10 -5124.10 -12833.99 13819.11 248.24 0.94 MWD_M 174 16459.00 75.12 246.51 95.00 6249 50 13910.84 -5161.21 -12917.97 13910.86 248.22 0.71 MWD_M 175 16555.00 75.34 247.59 96.00 '6273.97 14003.65 -5197.41 -13003.44 14003.66 248.21 1.11 MWD_M 176 16650.00 75.37 248.20 95.00 6297.99 14095.56 -5231.99 -13088.60 14095.58 248.21 0.62 MWD_M 177 16743.00 75.41 248.32 93.00 6321.45 14185.55 -5265.33 -13172.19 14185.57 248.21 0.13 MWD_M 178 16837.00 75.31 248.66 94 00 6345.21 1427.6.50 -5298.67 -13256.81 14276.51 248.21 0.37 MWD_M 179 16931.00 75.34 250,60 94.00 6369.03 14367.40 -5330'32 -13342.05 14367.42 248.22 2.00 MWD_M 180 17024.00 75.28 249'42 93.00 6392.61 14457.32 -5361.08 -13426.59 14457.33 248.23 1.23 MWD_M [(c)2001 Anadrill IDEAL ID6_1C_08] ANADRILL SCHLUMBERGER Survey Report Seq -- 181 182 183 184 185 186 187 188 189 190 191 192 19'3 194 195 196 197 198 199 2OO 201 202 203 204 205 206 207 208 209 210 Measured Incl Azimuth depth angle angle (ft) (deg). (deg) 17117.00 75.18 248.98 17207.00 75.72 248.96 17300.00 75.22 249.11 1739'3.00 75.18 248.87 17486.00 75.18 248.76 17580.00 17674.00 17767.00 17859.00 17952.00 18045.00 18137.00 18230.00 18324.00 18417.00 18508.00 18576.00 18622.00 18715.89 18808.00 18901.00 18992.00 19086.00 19179.00 19273.00 19366.00 19458.00 19550.00 19643.00 19735.00 Course length (ft) 93.00 90.00 93.00 93.00 93.00 TVD depth (ft) 6416.32 6438.93 6462.26 6486.02 6509.81 75.25 248.96 94.00 6533.79 75.22 249.27 94.00 6557.75 75.28 249.25 93.00 6581.43 75.28 248.90 92.00 6604.81 75.34 249.14 93.00 6628.39 75.25 248.79 75.21 248.84 75.22 250.17 75.24 249.29 75..28 249.63 93.00 92.00 93.00 94.00 93.00 6652.00 6675.45 6699.19 6723.15 6746.81 75.22 249.71 91.00 6769.98 75.12 249.81 68.00 6787.39 75.11 250.68 46.00 6799.20 74.92 250.42 93.89 6823.48 74.86 249.85 92.11 6847.49 93.00 91.00 94.00 93.00 94.00 93.00 92.00 92.00 93.00 92.00 74.80 250.23 74.76 250.-24 74.55 250.12 74.31 249.61 74.13 249.42 73.87 73.87 74.03 74.01 74.07 250.56 250.31 249.83 249.49 250.50 6871.83 6895.72 6920.59 6945.56 6971.12 6996.75 7022.31 7047.75 7073.35 7098.65 31-Jul-2001 13:56:22 Page 8 of 9 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) i00f) type type 14547.24 -5393.01 -13510.65 14634.34 -5424.27 -13591.96 14724.36 -5456.48 -13676.03 14814.27 -5488.72 -13759.96 14904.17 -5521.21 -13843.79 14995.05 -5553.99 -13928.57 15085..94 -5586.39 -14013.49 15175.86 -5618.24 -14097.60 15264.83 -5650.02 -14180.71 15354.79 -5682.23 -14264.71 15444.73 -5714.52 -14348.66 15533.69 -5746.66 -14431.61 15623.59 -5778.15 -14515.84 15714.45 -5809.64 -14601.10 15804.38 -5841.19 -14685.32 15892.35 -5871.77 -14767.84 15958.06 -5894.51 -14829.52 16002.50 -5909.53 -14871.36 16093.12 -5939.73 -14956.88 16182.00 -5969.95 -15040.51 16271.72 -6000.59 -15124.88 16359.48 -6030.28 -15207.52 16450.08 -6061.02 -15292.79 16539.63 -6091.86 -15376.91 16630.07 -6123.52 -15461.64 14547.24 14634.35 14724.37 14814.27 14904.17 14995.06 15085.94 15175.86 15264.84 15354.79 15444.74 15533.69 15623.59 15714.45 15804.38 15892.35 15958.07 16002.50 16093.13 16182.01 16271.73 16359.49 16450.09 16539.65 16630.09 16719.45 16807.77 16896.15 16985.54 17073.96 248.24 248.24 248.25 248.25 248.26 248.26 248.27 248.27 248.28 248.28 248.28 248.29 248.29 248.30 248.31 248.32 248.32 248.33 248.34 248.35 248.36 248.37 248.38 248.39 248.39 248.40 248.41 '248.42 248.43 248.44 16719.42 -61'54.11 -15545.64 16807.74 -6183.70 -15628.92 16896.11 -6213.84 -15712.04 16985.49 -6244.92 -15795.87 17073.91 -6275.18 -15878.98 0.47 0.60 0.56 0.25 0.11 0.22 0.32 0.07 0.37 0.26 0.38 0.07 1.38 0.91 0.36 0.11 0.20 1.83 0.34 0.60 0.40 0.05 0.26 0.59 0.27 1.21 0.26 0.53 0.35 1.06 [ (c) 2001 Anadrill IDEAL ID6_IC_08] ANADRILL SCHLUMBERGER Survey Report 31-Jul-2001 13:56:22 Page 9 of 9 ___ Seq 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 Measured depth (ft) 19829.00 19922.00 20015.78 20109.00 20202.00 Incl Azimuth Course angle angle length (deg) (deg) (ft) 74.11 249.98 94.00 73.88 250.25 93.00 73.43 250.47 93.78 73.32 250.18 93.22 73.69 250.79 93.00 20295.00 73.57 250.05 20388.00 73.66 250.96 20481.00 73.66 250.53 20575.00 73.49 250.85 20669.00 73.39 251.04 20760.00 20852.00 20943.00 21036.00 21126.00 73.22 250.29 73.17 250.48 73.01 251.27 72.90 250.89 72.86 251.93 226 21218~00 72.63 250.43 227 21311.00 72.56 250.76 228 21397.00 72.17 251.03 229 21&64.00 72.17 251.03 93.00 93.00 93.00 94.00 94.00 91.00 92.00 91.00 93.00 90.00 92.00 93.00 86.00 67.00 TVD Vertical Displ Displ Total depth section +N/S- +E/W- displ (ft) .(ft) (ft) (ft) (ft) 7124 42 7150.06 7176.45 7203.12 7229.53 At Azim (deg) 248.45 248.45 248.46 248.47 248.48 248.49 248.50 248.52 248.53 248.54 17164.25 -6305.74 -15964.06 17164.31 17253.60 -6336.14 -16048.12 17253.67 17343.53 -6366.39 -16132.88 17343.61 17432.80 -6396.46 -16216.99 17432.88 17521.91 -6426.25 -16301.04 17522.00 7255.74 17611.08 -6456.15 -16385.11 17611.18 7281.98 17700.23 -6485.93 -16469.21 17700.35 7308.14 17789.39 -6515.36 -16553.46 17789.52 7334.72 17879.48 -6545.17 -16638.56 17879.62 7361.51 17969.49 -6574.59 -16723.72 17969.64 7387.65 7414.25 7440.72 7467.98 7494.48 18056.58 -6603.45 -16805.97 18056.75 18144.59 -6633.02 -16888.93 18144.77 18231.57 -6661.54 -16971.19 18231.77 18320.38 -6690.37 -17055.30 18320.60 18406.26 -6717.79 -17136.82 18406.51 7521.77 7549.59 7575.64 7596.15 18494.01 -6746.13 -17219.98 18494.27 18582.68 -6775.62 -17303.69 18582.96 18664.55 -6802.44 -17381.13 18664.86 18728.26 -6823.17 -17441.45 18728.58 248.55 248.56 248.57 248.58 248.59 248.61 248.62 248.63 248.63 DLS (deg/ I00f) 0.53 0.37 0.53 0.32 0.74 0.77 0.94 0.44 0.37 0.22 0.81 0.21 0.85 0.41 1.11 1.58 0.35 0.54 0.00 Srvy tool type MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Tool qual type -- -- -- -- -- -- -- -- -- -- Projected [(c)2001 Anadrill IDEAL ID6_lC_08] AlaSKA OIL AND GAS CONSERVATION COMMISSION Scott Reynolds Phillips Alaska, Inc. PO Box 100360 Anchorage AK 99510-0360 TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re; Colville River Unit CD2-33 Phillips Alaska, Inc. Permit No: 201-120 Sur. Loc. 1894' FNL, 1522' FEL, SEC. 2, T1 IN, R4E, UM Btmhole Loc. 1741' FSL, 2221' FWL, SEC. 8, T1 IN, R4E, UM Dear Mr. Reynolds: Enclosed is the approved application for permit to drill the above referenced well. The AOGCC understands that CD2-33 is an extended reach well designed to evaluate the western limit of the Alpine Reservoir (Alpine West Prospect). Although LWD logs and samples will be obtained, the AOGCC understands there are no plans to test CD 2-33. Furthermore, the application for permit to drill (201-120) includes the details of the plug and abandonment operations of the reservoir delineation portion of well CD2-33. As long as the proposed P & A plans for CD2-33 are followed, it is not necessary to submit a separate 10-403 for AOGCC approval; however, any changes to the proposed plans may require the submission of a 10-403. Sufficient notice (24 hours) must be given to allow a representative of the Commission to witness the P & A operations. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use. Annular disposal has not been requested as part of the Permit to Drill application for CD2-33. Please note that any disposal of fluids generated from this drilling operation which are pumped down the surface/production casing annulus ofa well approved for annular disposal on CD2 pad must comply with the requirements and limitations of 20 AAC 25.080. Approval of this permit to drill does not authorize disposal of drilling waste in a volume greater than 35,000 barrels through the annular space of a single well or to use that well for disposal purposes for a period longer than one year. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Permit No: 201-120 Page 2 of 2 All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Julie M. Heusser Commissioner BY ORDER OF THE COMMISSION DATED this~'~ day of June, 2001 jjc/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. RECEIVED STATE OF ALASKA JUN I 9 2001 ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL Alaska Oil & Gas Cons. Commission 20 AAC 25.005 Anchorage la. Type of Work Drill X Redrill I lb. Type of Well Exploratory ,~ Stratigraphic Test Development OiJ Re-Entry DeepenI Service Development Gas Single Zone X Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Phillips Alaska~ Inc. DF 52' feet Colville River Field 3. Address 5. Property Designation Alpine Oil Pool P. O. Box 100360~ Anchora~e~ AK 99510-0360 ADL 387207~ ASRCNPRA02 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 1894' FNL, 1522' FEL SEC. 2, T11N, R4E, UM Colville River Unit Statewide At target (=7" casing point ) 8. Well number Number 1933' FSL, 2579' FEL SEC. 8, T11N, R4E, UM CD2-33 #U-630610 At total depth 9. Approximate spud date Amount 1741' FSLI 2221' FWL SEC. 8~ T11N~ R4E! UM 06/30/2001 $200~000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) Property line Nuiqsut #1 21,417" MD 1741' from south line feet 5280' @ 21,417' MD Feet 2560 7502' TVD feet of ASRCNPRA02 16. To be completed for deviated wells ...... 17. Anticipated pressure (see 20 AAC 25.035(~i(2)) Kickoff depth 500' feet Maximum hole angle 75.35 Maximum surface 2645 psig At total depth (TVD) 3371 at psig 7450' TVD.SS 18. Casing program s~tin,.cj Depth ,,, ' .... size Specfications ..Top.. Bottom . Quantity of cement ..................... Hole Casing Weight Grade Coupling Length MD 'rVD MD TVD (inc!ude stage data) 42" 16" 62.5# H-40 Weld 77' 37' 37' 114' 114' Pre-installed 1~'.25'' 9.625" 40# L-80 BTc 6463' 37' 37' 6500' 3730' 817 Sx Arcticset III L & ............ , ........ ,, ..... ,, ...... , ........... ,, ..... , ,, ................ ,, , ............... 230 Sx Class G ................................................................................ 19. To be completed for'Redrill, R'e-entry,""and Deepen'"0p~rations. ' .......................... Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical 20. Attachments Filing fee X Property plat ' BoP Sketch Diverter Sketch Drilling program X Drilling fluid program X Time vs depth plot Refraction analysis Seabed report 20 AAC 25.050 requirements X 21 ." i hereby certify that the foregoing is true'"~d correct to the best of my knowledge ............................................... Signed ~4~ L~¢~ ,,,, ~/-~ Title Drillin~l Team Leader Date ,./'7 Commission Use Onl¥//?r_Ch/ I .......... ..~,/' - ? ~-- ~'J 50-/'/~_.),.~' ~ ~. ~ ..~ <~' ~/ Other requirements Conditions of approval ~ samples required ~ No Mudl'(~r~quire'~ ~'~-e-~ No Hydrogen sulfide measures Yes ~ Directional survey required ~Yes-~-- No Required working pressure for BOPE 2M 3M ~ 10M 15M Other: 3 "~ ~' O pC / ',~:~ ~¢ ~ ,~ by order of Approved by ~;~f Commissioner the commission Date Form 10-401 Rev. 7.24-89 ~. M, Heusser s~ iplicate ORIG k AL CD2-33 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to 8pud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 12-1/4" Hole / 9-5/8" Casin,q Interval Event Risl~'Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low N/A Gas Hydrates Low Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, Iow mud temperatures Running Sands end Grovels Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps, run gravel isolation string. Abnormal preSsure in Low Diverter drills,' inCreased mud weight Surface Formations >2000' TVD Lost Circulation '"Low Reduced pump rotes, mud rheoiogy, lost circulatiOn ,,, material, use of Iow density cement slurries 8-112" Hole Event Risk Level' Mitigation Strategy Abnormal Pressure in Moderate BOPE drills, Keep mud weight above 10.4 ppg. Surface Formations Cheok for flow during connections and if needed, >2000' TVD increase mud weight Lost circulation LoW Reduced pump rates, reduced trip speedS, real time equivalent circulating density (ECD) monitoring, mud theology, lost oircu!.ation material HOle swabbing on tripS Moderate Reduced trip speeds, mud properties, PrOPer hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Abnormal Reservoir Low Well control drillSl increased mud weight. Pressure Hydrogen Sulfide gas .......... Low .......... H~'8 drills, detection 'SyStem's,'"alerms, Standard well . control pmctices~ mud s..ca~.engers Alpine: CD2-33 Summary. Procedure . 12-1/4" Surface Hole 1.1. Install diverter. Move on Doyon 19 & RU mud loggers. Function test diverter. 1.2. Drill 12 1/4 inch hole to the surface casing point ~ +/-6500' MD per the directional plan. Mud log entire section. 1.3. Run 9 5/8 surface casing with TAM port collar placed at +/- 1000' MD from surface. Cement %5/8" casing. 1.4. Install and test BOPE to 5000 psi. 1.5. Pressure test casing to 2500 psi. CD2-33 (Alpine West) 8-1/2" Hole Section. 2.1. Mud log entire 8-1/2" hole section. 2.2. With AutoTrak (GR/Res), drill out 20' of new hole. Perform leak off test. Maximum 16 ppg EMW. 2.3. Drill 8 1/2" hole to the K1 at +/- 20151' MD. 2.4. POOH and PU Inteq mud motor & Anadrill MWD/L~ (GR/Res/Neut/Den). RIH to +/- 20151'Drill to TD of CD2-33 (Alpine West) ~ 21417' MD. POOH and prep for plug back. 2.5. RIH with 3-1/2" x 5" tapered drill string with mule shoe. 2.6. Set 1st balanced cement plug from 21417' to 20883'. POOH to 20883' and circulate clean. 2.7. Pump 2nd balanced cement plug. POOH to 20683' and circulate clean. 2.8. POOH to7400 and lay in hi-vis pill to 7300' MD Pump 3rd balanced cement plug (kick-off plug) and, POOH to 6800'. Circulate hole clean mad POOH for sidetrack CD2-33A. Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD2-33 will be the closest well to CD2-42PH. Accounting for survey tool inaccuracies, the ellipse separation between these wells will be 13.6' at 8800' MD. Drillinq Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development wells. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumping Operations: Incidental fluids developed from drilling operations on well CD2-33 will be disposed of into the annulus of another permitted well on the CD2 pad or the CD1-19a Class II disposal well. This well will not be permitted for annular disposal. CD2-33 DRILLING FLUID pROGRAM " SpUD to "Intermediate holeto 7" '"Production Hole 9-5/8"surface casing casing point - 8 %" Section - 6 1/8" point- 12 ~" . ........... DensitY 8.8 - 9,6 ppg 9.6 - 9.8 ppg 9.2 ppg PV 10-25 10-15 YP 20 - 60 15 - 25 25 - 30 Funnel Viscosity 100 - 200 Initial Gels 4 - 8 10 - 15 10 minute gels <18 12 - 20 APl Filtrate NC - 10 cc/30 min 4 - 12 cc/30 min (drilling) HPHT Fluid Loss at 12 - 14 cc/30 min 160 8.5 - 9.0 9.0 - 10.0 9.0 - 9.5 PH 6 % KCL ............. Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline viscosity at + 200 sec/qt while drilling to the base of the permafrost. Lower viscosity to 90 sec/qt from the base of the permafrost to TD of the surface hole. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Sections CD2-33: Fresh water gel / polymer mud system. Ensure good hole cleaning by maintaining fluid rheology and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of Iow drill solids (by diluting as required) will all be important in maintaining wellbore stability. production Hole Sectio,n · The horizontal production interval will be drilled with a M-I FIo-Pro drill-in fluid. The base fluid will consist of 6% KCI, with + 30PPB calcium carbonate bridging material to minimize formation damage. FIo-Vis Polymer and DuaI-FIo starch will be used for viscosity and fluid loss control respectively. RKB - GL -- 37' Colville River Field CD2~33 (Alpine West) - Prior to Sidetrackinl4 ..... c ,,: .)0 Wellhead 16" Conductor Io 114' 9-5/8" 40 ppf U-80 BTC Sulface Casing 6500 IgD 1 3730' cerr ented to su~ace Top of cement plug #S (kJck~ off ptug) dressed off to 7000i ~/1D / 3857' -VD (+b 75.35° ir/c) Top of Cemenl Plug #3 aJ +i~ 6300' Bottom ef Cement Plug #3 at +!- 7300' 98 ppg drilfng mud in hoe i Cement Piu9 'FOp Alpine Reservoi al 20883' MD / 7367' TVD CD2~33PB1 Hole TD at 21417' MD / 7502' TVD (+/- 75° inc ) -Fop ef Cement Plug #2 at +/- 20683' 200' Above ~op of Alpine 100' excess coverage ever the required I00' Per AOGCC 20 AgC 25 107 & 25 112 Top of Cemen[ Plug #I at +/.. 20883' 534 f~ RKB - GL = 37' Colville River Field CD2-33 (Alpine West) - Prior to Sidetracking Updated 06/'t 8/200] Wellhead 16" Conductor to 114' 9-5/8" 40 ppf L-80 BTC Surface Casing @ 6500' MD / 3730' TVD cemented to surface Top of cement plug #3 (kick- off plug) dressed off to 7000' MD / 3857' TVD (+t- 75.35° inc.) 9.8 ppg drilling mud in hole Top Alpine Resel¥oir at 20883' MD t 7367' TVD CD2-33PB1 Hole TD at 21417' MD / 7502' TVD (+/- 75° inc.) 580 ft Top of Cement Plug #3 at +F 6800' Bottom of Cement Plug #3 at +/- 7300' Top of Cement Plug #2 at +/- 20683' 200' Above top of Alpine 100' excess coverage over the required 100' Per AOGCC 20 AAC 25,107 & 25.112 288 ft -Top of Cement Plug #1 at +/- 20883' 534 ¢~ CD2-33 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casi'ng Size Csg Setting Fracture Pore pressure ASP Ddlling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114 / 114 10.9 52 53 9 5/8 6500 / 3730 14.5 1688 (0.4525 psi/fi)2440 8-1/2" hole TD 21417 / 7502 16.0 3395 (0.4525 psi/fi)N/A NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE ('ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP= FPP- (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point . ASP CALCULATIONS Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1} D = [(10.9 x 0.052) - 0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1688 - (0.1 x 3730') = 1315 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1} D = [(14.5 x 0.052) - 0.1] x 3730' = 2440 psi OR ASP = FPP - (0.1 x D) = 3395 - (0.1 x 7502') = 2645 psi Alpine, CD2-33 Cementin,q Requirements CD2-33 Cement Plug #1 · 21417' MD to 20883' MD = 534'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 534'X 0.3941 ft3/ft X 1.15 (15% excess) = 242 ft3 => 210 Sx @ 1.16 ft~/sk CD2-33 Cement Plug #2: 20883' MD to 20683' MD = 200'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 200'X 0.3941 ft3/ft X 1.15 (15% excess) = 90.6 ft3 => 80 sx @ 1.16 ft~/sk CD2-33 Cement Plug #3 (Kick-Off Plug): 7300' MD to 6800' MD = 500'. Cement with Class G + additives @ 17 ppg. Assume 15% excess on open hole volume. Slurry: 500'X 0.3941 ft~/ff X 1.15 (15% excess) = 227 ft~ => 227sx @ 1.00 ft3/sk CD2~33 (Alpine West) Plan View !Phdllps Alaska, Inc l Structure: CD#2 Well : 53~ Field : Alpine Field Location : North Slope, Alaskai <- West (feet) 17600 16800 16000 15200 14+00 13600 12800 12000 11200 10400 9600 8800 8000 7200 6400 5600 4800 4000 5200 2400 1600 800 248.33 AZIMUTH 18175' (TO PB1 TARGET) ***Plane of Proposal*** TRUE LOCATION: i 953' FSL, 2579' FEL SEC. 8, T11N, R4E LOCATION: 1'741' FSL, 2221' FWL SEC. B, T11N, R4E 0 CD2-3~D 1 - Csg Pt. LOCATION: g78' FNL, 2566' FWLi 8O0 SEC. 5, T11N, R4E o LOCATION: 600 1600 2400 3200 460O 5600 CD2-33 (Alpine West) Phillips Alaska, Inc. RKB Elevation: 52' 1.00K°P ~'~1~ Bu',d 2/1 O0 1O0 Base Permafrost 1~,00 DLS: 2.00 der per 100 ft 28.00 Build 3/100 36,00C-4o 45.00C-30 54,00C-20 DLS: 5,00 der per 100 ft 248.33 AZIMUTH 18175' (TO PB1 TARGET) O ~-~ 900 ~ . ~ 1800- ~ 2700 ' CD KOP - 88.00 EOC . Sidetrack PtB7 900 36.06 DEG ~^lbien 88 TANGENT ANGLE '~b ~'~Jbion-96 AN~_98 %x TANGENT -.. 63.40 DEG ~%HRZ Vertical Section (feet) CD2-33 (Alpine West) Phillips Alaska, Inc. Structure: CD~2 Field: Alpine Field Well: 331 Location : North Slope, Alaska Point KOP Build 2/100 Base Permafrost Build 5/100 C-40 C-30 C-20 EOC 9 5/8 Casing Pt. K-3 K-2 Albian-97 Albian-96 HRZ K-1 LCU Miluveach A Alpine D Target Alpine Base Alpine TD PROFIL E COMMENT DAT MD Inc Dir TVD North 500.00 0.00 0.00 500.00 0.00 900.00 4.00 248.53 899.68 -5.15 1052.91 6.66 248.53 1052.00 -9.71 2200.00 30.00 248.55 2152.25 - 144.28 2289.90 52.70 248.55 2209.00 -161.55 2556.05 40.08 248.55 2407.00 -215.42 3051.29 55.54 248.33 2752.00 -355.95 3711.77 75.55 248.35 3025.10 -576.65 6500.00 75.55 248.35 3750.14 -1572.66 6981.95 75.55 248.35 3852.00 -1744.81 7772.87 75.35 248.55 4052.00 -2027.55 14100.41 75.55 248.33 5652.00 -4287.65 15919.58 75.35 248.33 6112.00 -4937.49 19083.55 75.55 248.33 6912.00 -6067.64 20151.12 75.55 248.33 7182.00 -6449.07 20546.59 75.35 248.33 7282.00 -6590.34 20764.10 75.55 248.55 7357.00 -6668.04 20803.65 75.35 248.33 7347.00 -6682.1 6 20882.72 75.35 248.35 7366.99 -6710.41 20882.74 75.55 248.55 7567.00 -6710.42 21139.80 75.35 248.33 7432.00 -6802.24 21416.63 75.35 248.33 7502.00 -6901.13 A East 0.00 -12.97 -24.44 -565.18 -406.64 -542.24 -895.96 - 1 451.49 -3958.50 -4391.83 -5103.00 -10792.35 - 12428.04 -15272.72 - 1 6232.80 - 16588.38 -16783.95 -16819.51 -16890.61 -16890.65 -17121.76 -17370.67 V. Sect 0.00 13.96 26.30 390.79 437.55 583.47 964.08 1561.84 4259.46 4725.73 5490.97 11612.87 13372.92 16433.88 17466.95 17849.57 18060.01 18098.27 18174.77 18174.79 18425.50 18691.53 Deg/1 O0 0.00 1.00 2.00 2.00 3.00 3.00 3.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CD2-33 (Alpine Wes[) 310 500 290 280 iPhillips Alaska, Inc. TRUE NORTH 350 0 340 "~0 210 -%}700 320 10 2O 50 40 5O 270 2 260 250 240 230 220 !40 210 / 150 2300200 , 160 1~0 180 170 Normol Plone Trevelling Cylinder -- Feet All depths shown ere iedsured depths on Reference Well 6O 7O 8O 0 90 100 110 120 150 CD2-33 (Alpine Wes0 Phillips Alaska, Inc. <- West (feet) 3404 327 t 300 280 260 240 220t 2100 180 .... 40 120 100 80 60 4? 20 0 20 ¢3 60 80 ' , zsbo ~ ' ' ' ,~ ?9 e 300 o ;20~?o~.~o6' ~oo ~oo *ooo * 54~g'l~dO ~. -' '-"~600~500 . , ~400 1.060~ gO0 ~ ~0~,°00 '~ 1300 SO , 3506. - ' ' -" ' 1700 ~ 1~00' 4100 . ~300 O~ 1400 CD2-33 (Alpine WesO Phdhps Alaska, Inc.i F~eld : Alpine Field Location: Norfh Slope, Alaska <- West (feet) 2400 2300 2200 2100 2000 1900 1800 1700 1600 1500 !400 1300 ~200 1100 1000 900 800 700 600 500 400 300 200 ' , ' ' .2~8o ' ' -j " soo ~ooo::;: *~ooo. - ' . . ¢ 5¢00 /2100 ~ 2,1'00' 900 CD2-33 (Alpine West) I hdhps Alaska, Inc. I Structure: CD#2 Well : 35PB1 Field : Alpine Field Location : Norfh Slope, Aloskal 3900 3800 5700 5600 7274 <- West (feet) 3100 50~00 ~ 2900 2800 2700 26~00 2500 · ~J4$o 6~o9..*oop--~soo 24100 2800 2200 2100 2000 1900 1800 1700 54.o2 .-." ~ 5800. ~6~0 *3600 1 lo0 · 500 CD2-33 (Alpine West) ', hdhps Alaska, Inc. StrucTure : CD#2 Well : 53PBI 7400 72OO 700O 6800 ~4600 6600 84~00 8200 6000 5800 ~ ~600 3%4 <- West (feet) 5600 5400 5200 5000 ¢800 4600 44~00 4200 I 4000 3800 3800 5400 52~00 3000 % ' ' ~: . ~-5~00 .,'5800 4600 ,~ 2000 ',.~oo ~o~ .~-~ . ' ' ~oo ?¢20o ¢~ '/' ' '* CD2-33 (Alpine Wesl) Phillips Alaska, lnc.i i Structure: CD#2 Well : 53PBI i I Field: Alpine Held Locoflon : North Slope, Atoskol <- West (feet) · *7200 *6'400 ' ' 6000 · ' 5400 5600 5800 ~ ~4&oo -%00 4200 - ' 7512.%-4~00 %600 72~0 ' '. 4600 ,'5600 ~ 7200 ,..~ooo CD2-33 (Alpine West) COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33'~ slot ~33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33~ Version#Ii Our ref : prop3683 License : Date printed : 5-Jun-2001 Date created : 22-Oct-1999 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33 (Alpine West) COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33~ Alpine Field,North Slope, Alaska PROPOSAL LISTING Page ! Your ref : 33 ~ Version~ll Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O O R D S G E O G R A P H I C Depth Degrees Degrees Depth 0.00 0.00 0.00 0.00 500.00 0.00 0.00 500.00 600.00 1.00 248.34 599.99 700.00 2.00 248.33 699.96 800.00 3.00 248.33 799.86 900.00 4.00 248.33 899.68 1000.00 6.00 248.33 999.29 1032.91 6.66 248.33 1032.00 1100.00 8.00 248.33 1098.54 1200.00 10.00 248.33 1197.31 1300.00 12.00 248.33 1295.46 1400.00 14.00 248.33 1392.89 1500.00 16.00 248.33 1489.48 1600.00 18.00 248.33 1585.11 1700.00 20.00 248.33 1679.66 1800.00 22.00 248.33 1773.01 1900.00 24.00 248.33 1865.05 2000.00 26.00 248.33 1955.68 2100.00 28.00 248.33 2044.78 2200.00 30.00 248.33 2132.23 2289.90 32.70 248.33 2209.00 2300.00 33.00 248.33 2217.49 2400.00 36.00 248.33 2299.89 2500.00 39.00 248.33 2379.22 2536.03 40.08 248.33 2407.00 2600.00 42.00 248.33 2455.25 2700.00 45.00 248.33 2527.78 2800.00 48.00 248.33 2596.61 2900.00 51.00 248.33 2661.54 3000.00 54.00 248.33 2722.41 3051.29 55.54 248.33 2752.00 3100.00 57.00 248.33 2779.05 3200.00 60.00 248.33 2831.29 3300.00 63.00 248.33 2879.00 3400.00 66.00 248.33 2922.05 3500.00 69.00 248.33 2960.31 3600.00 72.00 248.33 2993.69 3700.00 75.00 248.33 3022.09 3711.77 75.35 248.33 3025.10 4000.00 75.35 248.33 3097.98 4500.00 75.35 248.33 3224.41 5000.00 75.35 248.33 3350.84 5500.00 75.35 248.33 3477.27 6000.00 75.35 248.33 3603.71 6500.00 75.35 248.33 3730.14 6981.93 75.35 248.33 3852.00 7000.00 75.35 248.33 3856.57 7500.00 75.35 248.33 3983.00 7772.87 75.35 248.33 4052.00 8000.00 75.35 248.33 4109.43 C O O R D i N A T E S Easting Northing C O O R D I N A T E S 0.00S 0.00N 0.32S 1.29S 2.90S 5.15S 8.37S 9.71S 12.87S 18.64S 25.69S 33.99S 43.55S 54.34S 66.36S 79.59S 94.02S 109.62S 126.38S 144.28S 161.55S 163.57S 184.48S 206.96S 215.42S 230.93S 256.34S 283.12S 311.19S 340.48S 355.95S 370.91S 402.38S 434.83S 468.15S 502.26S 537.06S 572.45S 576.65S 679.62S 858.22S 1036.83S 1215.44S 1394.05S 1572.66S 1744.81S 1751.27S 1929.88S 2027.35S 2108.48S 0.00E 371715.27 5974463.39 nT0 20 18.47 wlS1 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.48 w151 2 27.44 0.81W 371714.45 5974463.08 n70 20 18.47 w151 2 27.46 3.24W 371712.01 5974462.15 n70 20 18.46 w151 2 27.53 7.30W 371707.93 5974460.61 n70 20 18.45 w151 2 27.65 12.97W 371702.22 5974458.45 n70 20 18.42 wlS1 2 27.82 21.07W 371694.06 5974455.37 n70 20 18.39 w151 2 28.05 24.44W 371690.67 5974454.09 n70 20 18.38 w151 2 28.15 32.40W 371682.67 5974451.07 n70 20 18.35 w151 2 28.38 46.93W 371668.03 5974445.54 n70 20 18.29 w151 2 28.81 64.66W 371650.19 5974438.79 n70 20 18.22 w151 2 29.33 85.57W 371629.15 5974430.84 n70 20 18.14 w151 2 29.94 109.62W 371604.94 5974421.70 n70 20 18.05 w151 2 30.64 136.79W 371577.59 5974411.37 n70 20 17.94 w151 2 31.43 167.05W 371547.14 5974399.86 n70 20 17.82 w151 2 32.32 200.35W 371513.62 5974387.20 n70 20 17.69 w151 2 33.29 236.66W 371477.07 5974373.39 n70 20 17.55 w151 2 34.35 275.93W 371437.55 5974358.45 n70 20 17.40 w151 2 35.50 318.12W 371395.08 5974342.41 n70 20 17.23 w151 2 36.73 363.18W 371349.74 5974325.27 n70 20 17.06 w151 2 38.04 406.64W 371306.00 5974308.75 n70 20 16.89 wlS1 2 39.31 411.73W 371300.87 5974306.81 n70 20 t6.87 w151 2 39.46 464.36W 371247.90 5974286.79 n70 20 16.66 w151 2 41.00 520.93W 371190.96 5974265.28 n70 20 16.44 w151 2 42.65 542.24W 371169.51 5974257.18 n70 20 16.36 w151 2 43.27 581.28W 371130.22 5974242.33 n70 20 16.20 w151 2 44.41 645.24W 371065.84 5974218.01 n70 20 15.95 w151 2 46.28 712.65W 370998.00 5974192.37 n70 20 15.69 w151 2 48.25 783.31W 370926.88 5974165.50 n70 20 15.41 w151 2 50.31 857.03W 370852.68 5974137.47 n70 20 15.12 w151 2 52.47 895.96W 370813.49 5974122.66 n70 20 14.97 w151 2 53.60 933.61W 370775.60 5974108.34 nT0 20 14.82 wlS1 2 54.70 1012.84W 370695.86 5974078.21 n70 20 14.51 wlS1 2 57.02 1094.50W 370613.66 5974047.16 n70 20 14.20 w151 2 59.40 1178.38W 370529.25 5974015.26 n70 20 13.87 wlS1 3 01.85 1264.23W 370442.84 5973982.61 n70 20 13.53 w151 3 04.36 1351.82W 370354.68 5973949.30 n70 20 13.19 wlS1 3 06.92 1440.92W 370265.00 5973915.42 n70 20 12.84 w151 3 09.52 1451.49W 370254.36 5973911.40 n70 20 12.80 w151 3 09.83 1710.65W 369993.52 5973812.84 n70 20 11.79 w151 3 17.39 2160.22W 369541.03 5973641.87 n70 20 10.03 w151 3 30.52 2609.79W 369088.54 5973470.90 n70 20 08.27 w151 3 43.65 3059.36W 368636.05 5973299.93 n70 20 06.51 w151 3 56.77 3508.93W 368183.56 5973128.97 n70 20 04.75 w151 4 09.90 3958.50W 367731.07 5972958.00 n70 20 02.99 w151 4 23.02 4391.83W 367294.94 5972793.21 n70 20 01.29 wlS1 4 35.67 4408.07W 367278.58 5972787.03 n70 20 01.23 w151 4 36.15 4857.65W 366826.09 5972616.06 n70 19 59.47 wlS1 4 49.27 5103.00W 366579.15 5972522.75 n70 19 58.51 w151 4 56.43 5307.22W 366373.60 5972445.09 n70 19 57.71 w151 5 02.39 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33 (Alpine West) COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. PROPOSAL LISTING Page 2 CDi!2,33~* Your ref : 33 ~.Version~l! Alpine Field,North Slope, Alaska Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O O R D S G E O G R A P H I C Depth Degrees Degrees Depth 8500.00 75.35 248.33 4235.86 9000.00 75.35 248.33 4362.30 9500.00 75.35 248.33 4488.73 10000.00 75.35 248.33 4615.16 10500.00 75.35 248.33 4741.59 11000.00 75.35 248.33 4868.02 11500.00 75.35 248.33 4994.45 12000.00 75.35 248.33 5120.88 12500.00 75.35 248.33 5247.32 13000.00 75.35 248.33 5373.75 13500.00 75.35 248.33 5500.18 14000.00 75.35 248.33 5626.61 14100.41 75.35 248.33 5652.00 14500.00 75.35 248.33 5753.04 15000.00 75.35 248.33 5879.47 15500.00 75.35 248.33 6005.90 15919.58 75.35 248.33 6112.00 16000.00 75.35 248.33 6132.34 16500.00 75.35 248.33 6258.77 17000.00 75.35 248.33 6385.20 17500.00 75.35 248.33 6511.63 18000.00 75.35 248.33 6638.06 18500.00 75.35 248.33 6764.49 19000.00 75.35 248.33 6890.92 19083.35 75.35 248.33 6912.00 19500.00 75.35 248.33 7017.36 20000.00 75.35 248.33 7143.79 20151.12 75.35 248.33 7182.00 20500.00 75.35 248.33 7270.22 20546.59 75.35 248.33 7282.00 20764.10 75.35 248.33 7337.00 20803.65 75.35 248.33 7347.00 20882.72 75.35 248.33 '7366.99 20882.74 75.35 248.33 7367.00 21000.00 75.35 248.33 7396.65 21139.80 75.35 248.33 7432.00 21416.63 75.35 248.33 7502.00 C O O R D I N A T E S Easting Northing C O O R D I N A T E S 2287.09S 5756.79W 365921.11 5972274.12 n70 19 55.95 wlS1 5 15.52 2465.70S 6206.36W 365468.63 5972103.15 nT0 19 54.19 w151 5 28.64 2644.31S 6655.93W 365016.14 5971932.18 n70 19 52.43 w151 5 41.76 2822.92S 7105.50W 364563.65 5971761.22 n70 19 50.66 wlS1 5 54.88 3001.53S 7555.07W 364111.16 5971590.25 nT0 19 48.90 wlS1 6 08.00 3180.13S 8004.64W 363658.67 5971419.28 n70 19 47.14 wlS1 6 21.12 3358.74S 8454.21W 363206.18 5971248.31 nT0 19 45.38 wlS1 6 34.24 3537.35S 8903.78W 362753.69 5971077.34 n70 19 43.62 wlS1 6 47.35 3715.96S 9353.36W 362301.20 5970906.37 n70 19 41.85 w151 7 00.47 3894.57S 9802.93W 361848.71 5970735.40 n70 19 40.09 wlS1 7 13.59 4073.18S 10252.50W 361396.22 5970564.44 n70 19 38.33 wlS1 7 26.70 4251.79S 10702.07W 360943.73 5970393.47 n70 19 36.56 wlS1 7 39.82 4287.65S 10792.35W 360852.86 5970359.13 n70 19 36.21 wlS1 7 42.45 4430.39S 11151.64W 360491.24 5970222.50 n70 19 34.80 wlS1 7 52.93 4609.00S 11601.21W 360038.75 5970051.53 n70 19 33.03 w151 8 06.05 4787.61S 12050.78W 359586.27 5969880.56 n70 19 31.27 wlS1 8 19.16 4937.49S 12428.04W 359206.56 5969737.09 n70 19 29.79 wlS1 8 30.16 4966.22S' 12500.35W 359133.78 5969709.59 n70 19 29.51 wlS1 8 32.27 5144.83S 12949.92W 358681.29 5969538.62 n70 19 27.74 w151 8 45.38 5323.44S 13399.49W 358228.80 5969367.65 n70 19 25.98 wlS1 8 58.50 5502.05S 13849.07W 357776.31 5969196.69 n70 19 24.21 w151 9 11.61 5680.65S 14298.64W 357323.82 5969025.72 n70 19 22.44 wlS1 9 24.72 5859.26S 14748.21W 356871.33 5968854.75 n70 19 20.68 wlS1 9 37.83 6037.87S 15197.78W 356418.84 5968683.78 n70 19 18.91 wlS1 9 50.94 6067.64S 15272.72W 356343.41 5968655.28 n70 19 18.62 w151 9 53.12 6216.48S 15647.35W 355966.35 5968512.81 n70 19 17.15 w151 10 04.04 6395.09S 16096.92W 355513.86 5968341.84 n70 19 15.38 w151 10 17.15 6449.07S 16232.80W 355377.10 5968290.17 n70 19 14.84 wlS1 10 21.11 6573.70S 16546.49W 355061.37 5968170.87 n70 19 13.61 wlS1 10 30.26 6590.34S 16588.38W 355019.21 5968154.94 n70 19 13.45 wlS1 10 31.48 6668.04S 16783.95W 354822.37 5968080.57 n70 19 12.68 w151 10 37.18 6682.16S 16819.51W 354786.58 5968067.05 nT0 19 12.54 wlS1 10 38.22 6710.41S 16890.61W 354715.02 5968040.01 n70 19 12.26 wlS1 10 40.29 6710.42S 16890.63W 354715.00 5968040.00 nT0 19 12.26 wlS1 10 40.29 6752.31S 16996.06W 354608.88 5967999.90 n70 19 11.84 wlS1 10 43.37 6802.24S 17121.76W 354482.37 5967952.10 n70 19 11.35 wlS1 10 47.03 6901.13S I7370.67W 354231.84 5967857.44 n70 19 10.37 wlS1 10 54.29 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33 (Alpine West) COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33~ Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 ~ VersionNll LasE revised : 5-Jun-2001 Comments in wellpath MD TVD Rectangular Coords. Comment 500.00 900.00 1032.91 2200.00 2289.90 2536.03 3051.29 3711.77 6500.00 6981.93 7772.87 14100.41 15919.58 19083.35 20151.12 20546.59 20764.10 20803.65 20882.72 20882.74 21139.80 21416.63 500.00 899.68 1032.00 2132.23 2209.00 2407.00 2752.00 3025.10 3730.14 3852.00 4052.00 5652.00 6112.00 6912 00 7182 00 7282 00 7337 00 7347 00 7366 99 7367 00 7432 00 7502 00 O.00N 0.00E KOP 5.15S 12.97W Build 2/100 9.71S 24.44W Base Permafrost 144.28S 363.18W Build 3/100 161.55S 406.64W C-40 215.42S 542.24W C-30 355.95S 895.96W C-20 576.65S 1451.49W EOC 1572.66S 3958.50W 9 5/8" Casing Pt. 1744.81S 4391.83W K-3 2027.35S 5103.00W K-2 4287.65S 10792.35W Albian-97 4937.49S 12428.04W Albian-96 6067.64S 15272.72W HRZ 6449.07S 16232.80W K-1 6590.34S 16588.38W LCU 6668.04S 16783.95W Miluveach A 6682.16S 16819.51W Alpine D 6710.41S 16890.61W Target 6710.42S 16890.63W AlpWst 2ndryTgt Rvsd 15-Mar-01 6802.24S 17121.76W Base Alpine 6901.13S 17370.67W TD Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.14 1572.66S 3958.50W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised AlpWst 2ndryTgt Rvsd 354715.000,5968040.000,0.0000 7367.00 6710.42S 16890.63W 15-Mar-2001 CD2-33 (Alpine West) STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33~ slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker ~{ughes INTEQ Your ref : 33 ~Version#11 Our ref : prop3683 License : Date printed : 5-Jun-2001 Date created : 22-Oct-1999 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.~75,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33 (Alpine West) STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,331~f Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth 0,00 0.00 0.00 0.00 500,00 0.00 0.00 500.00 600.00 1.00 248.34 599.99 700~00 2.00 248.33 699.96 800.00 3.00 248.33 799.86 900.00 4.00 248.33 899.68 1000.00 6.00 248.33 999.29 1032.91 6.66 248.33 1032.00 1100.00 8.00 248.33 1098.54 1200.00 10.00 248.33 1197.31 1300.00 12,00 248.33 1295.46 1400.00 14.00 248.33 1392.89 1500.00 16.00 248.33 1489.48 1600.00 18.00 248.33 1585.11 1700.00 20.00 248.33 1679.66 1800.00 22.00 248.33 1773.01 1900.00 24.00 248.33 1865.05 2000.00 26.00 248.33 1955.68 2100.00 28.00 248.33 2044.78 2200.00 30.00 248,33 2132.23 2289.90 32.70 248.33 2209.00 2300.00 33.00 248,33 2217.49 2400.00 36.00 248.33 2299.89 2500.00 39.00 248,33 2379.22 2536.03 40.08 248,33 2407.00 2600.00 42.00 248.33 2455.25 2700.00 45.00 248.33 2527.78 2800.00 48.00 248.33 2596.61 2900.00 51.00 248.33 2661.54 3000.00 54.00 248.33 2722.41 3051.29 55.54 248.33 2752.00 3100.00 57.00 248.33 2779.05 3200.00 60.00 248.33 2831.29 3300.00 63.00 248.33 2879.00 3400.00 66.00 248.33 2922.05 3500.00 69.00 248.33 2960.31 3600.00 72.00 248.33 2993.69 3700.00 75.00 248.33 3022.09 3711.77 75.35 248.33 3025.10 4000.00 75.35 248.33 3097.98 4500.00 75.35 248.33 3224.41 5000.00 75.35 248.33 3350.84 5500.00 75.35 248.33 3477.27 6000.00 75.35 248.33 3603.71 6500.00 75.35 248.33 3730.14 6981.93 75.35 248.33 3852.00 7000.00 75.35 248.33 3856.57 7500.00 75.35 248.33 3983.00 7772.87 75.35 248.33 4052.00 8000.00 75.35 248.33 4109.43 PROPOSAL LISTING Page 1 Your ref : 33 ~ Version#Ii Last revised : 5-Jun-2001 R E C T A N G U L A R Dogleg Vert C 00 R D I N A T E S Deg/100fc Sect 0.00 S 0.00 E 0.00 0.00 0.00 N 0.00 E 0.00 0.00 KOP 0.32 S 0.81 W 1.00 0.87 1.29 S 3.24 W 1.00 3.49 2.90 S 7.30 W 1.00 7.85 5.15 S 12.97 W 1.00 13.96 Build 2/100 8.37 S 21.07 W 2.00 22.67 9.71 S 24.44 W 2.00 26.30 Base Permafrost 12.87 S 32.40 W 2.00 34.86 18.64 S 46.93 W 2.00 50.50 25.69 S 64.66 W 2.00 69.58 33.99 S 85.57 W 2.00 92.07 43.55 S 109.62 W 2.00 117.96 54.34 S 136.79 W 2.00 147.19 66.36 S 167.05 W 2.00 179.75 79.59 S 200.35 W 2.00 215.58 94.02 S 236.66W 2.00 254.65 109.62S 275.93W 2.00 296.91 126.38S 318.12W 2.00 342.31 144.28S 363.18W 2.00 390.79 Build 3/100 161.55S 406.64W 3.00 437.55 C-40 163.57S 411.73W 3.00 443.03 184.48S 464.36W 3.00 499.67 206.96S 520.93W 3.00 560.53 215.42S 542.24W 3.00 583.47 C-30 230.93S 581.28W 3.00 625.47 256.34S 645.24W 3.00 694.30 283.12S 712.65W 3.00 766.83 311.19S 783.31W 3.00 842.86 340.48S 857.03W 3.00 922.19 355.95S 895.96 W 3.00 964.08 C-20 370.91S 933.61 W 3.00 1004.59 402.38S 1012.84W 3.00 1089.84 434.83S 1094.50W 3.00 1177.72 468.15S 1178.38W 3.00 1267.96 502.26S 1264.23W 3.00 1360.34 537.06S 1351.82W 3.00 1454.59 572.45S 1440.92W 3.00 1550.47 576.65S 1451.49W 3.00 1561.84EOC 679.62S 1710.65W 0.00 1840.71 858.22 S 2160.22W 0.00 2324.46 1036.83S 2609.79W 0.00 2808.21 1215.44S 3059.36W 0.00 3291.96 1394.05S 3508.93W 0.00 3775.71 1572.66S 3958.50W 0.00 4259.46 9 5/8" Casing Pt. 1744.81S 4391.83W 0.00 4725.73 K-3 1751.27S 4408.07W 0.00 4743.21 1929.88S 4857.65W 0.00 5226.96 2027.35S 5103.00W 0.00 5490.97K-2 2108.48S 5307.22W 0.00 5710.71 Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33 (Alpine West) STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33~ Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth 8500.00 75.35 248.33 4235.86 9000.00 75.35 248.33 4362.30 9500.00 75.35 248.33 4488.73 10000.00 75.35 248.33 4615.16 10500.00 75.35 248.33 4741.59 11000.00 75.35 248.33 4868.02 11500.00 75.35 248.33 4994.45 12000.00 75.35 248.33 5120.88 12500.00 75.35 248.33 5247.32 13000.00 75.35 248.33 5373.75 13500.00 75.35 248.33 5500.18 14000.00 75.35 248.33 5626.61 14100.41 75.35 248.33 5652.00 14500.00 75.35 248.33 5753.04 15000.00 75.35 248.33 5879.47 15500.00 75.35 248.33 6005.90 15919.58 75.35 248.33 6112.00 16000.00 75.35 248.33 6132.34 16500.00 75.35 248.33 6258.77 17000.00 75.35 248.33 6385.20 17500.00 75.35 248.33 6511.63 18000.00 75.35 248.33 6638.06 18500.00 75.35 248.33 6764.49 19000.00 75.35 248.33 6890.92 19083.35 75.35 248.33 6912.00 19500.00 75.35 248.33 7017.36 20000.00 75.35 248.33 7143.79 20151.12 75.35 248.33 7182.00 20500.00 75.35 248.33 7270.22 20546.59 75.35 248.33 7282.00 20764.10 75.35 248.33 7337.00 20803.65 75.35 248.33 7347.00 20882.72 75.35 248.33 7366.99 20882.74 75.35 248.33 7367.00 21000.00 75.35 248.33 7396.65 21139.80 75.35 248.33 7432.00 21416.63 75.35 248.33 7502.00 PROPOSAL LISTING Page 2 Your ref : 33 ~ Version#II Last revised : 5-Jun-2001 R E C T A N G U L A R Dogleg Vert C O O R D I N A T E S Deg/100ft Sect 2287.09 S 5756.79 W 0.00 6194.46 2465.70 S 6206.36 W 0.00 6678.22 2644.31 S 6655.93 W 0.00 7161.97 2822.92 S 7105.50 W 0.00 7645.72 3001.53 S 7555.07 W 0.00 8129.47 3180.13 S 8004.64 W 0.00 8613.22 3358.74 S 8454.21 W 0.00 9096.97 3537.35 S 8903.78 W 0.00 9580.72 3715.96 S 9353.36 W 0.00 10064.47 3894.57 S 9802.93 W 0.00 10548.22 4073.18 S 10252.50 W 0.00 11031.98 4251.79 S 10702.07 W 0.00 11515.73 4287.65 S 10792.35 W 0.00 11612.87 Albian-97 4430.39 S 11151.64 W 0.00 11999.48 4609.00 S 11601.21 W 0.00 12483.23 4787.61 S 12050.78 W 0.00 12966.98 4937.49 S 12428.04 W 0.00 13372.92 Albian-96 4966.22 S 12500.35 W 0.00 13450.73 5144.83 S 12949.92 W 0.00 13934.48 5323.44 S 13399.49 W 0.00 14418.23 5502.05 S 13849.07 W 0.00 14901.98 5680.65 S 14298.64 W 0.00 15385.73 5859.26 S 14748.21 W 0.00 15869.49 6037.87 S 15197.78 W 0.00 16353.24 6067.64 S 15272.72 W 0.00 16433.88 HRZ 6216.48 S 15647.35 W 0.00 16836.99 6395.09 S 16096.92 W 0.00 17320.74 6449.07 S 16232.80 W 0.00 17466.95 K-1 6573.70 S 16546.49 W 0.00 17804.49 6590.34 S 16588.38 W 0.00 17849.57 LCU 6668.04 S 16783.95 W 0.00 18060.01 Miluveach A 6682.16 S 16819.51 W 0.00 18098.27 Alpine D 6710.41 S 16890.61 W 0.00 18174.77 Target 6710.42 S 16890.63 W 0.00 18174.79 AlpWst 2ndryTgt Rvsd 15-Mar-01 6752.31S 16996.06W 0.00 18288.24 6802.24S 17121.76W 0.00 18423.50 Base Alpine 6901.13S 17370.67W 0.00 18691.33 TD Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33 (Alpine West) STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33~ Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 ~1~ Version~ll Last revised : 5-Jun-2001 Comments in wellpath MD TVD Rectangular Coords. Comment 500.00 900.00 1032.91 2200.00 2289.90 2536.03 3051.29 3711.77 6500.00 6981.93 7772.87 14100.41 15919 58 19083 35 20151 12 20546 59 20764 10 20803 65 20882 72 20882 74 21139 80 21416 63 50O 899 1032 2132 2209 2407 2752 3025 3730 3852 00 4052 00 5652 00 6112 00 6912 00 7182 00 7282 00 7337 00 7347.00 7366.99 7367.00 7432.00 7502.00 0.00 N 0.00 E KOP 5.15 S 12.97 W Build 2/100 9.71 S 24.44 W Base Permafrost 144.28 S 363.18 W Build 3/100 161.55 S 406.64 W C-40 215.42 S 542.24 W C-30 355.95 S 895.96 W C-20 576.65 S 1451.49 W EOC 1572.66 S 3958.50 W 9 5/8" Casing Pt. 1744.81 S 4391.83 W K-3 2027.35 S 5103.00 W K-2 4287.65 S 10792.35 W Albian-97 4937.49 S 12428.04 W Albian-96 6067.64 S 15272.72 W HRZ 6449.07 S 16232.80 W K-1 6590.34 S 16588.38 W LCU 6668.04 S 16783.95 W Miluveach A 6682.16 S 16819.51 W Alpine D 6710.41 S 16890.61 W Target 6710.42 S 16890.63 W AlpWst 2ndryTgt Rvsd 15-Mar-01 6802.24 S 17121.76 W Base Alpine 6901.13 S 17370.67 W TD Casing positions in string 'A' Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.14 1572.66S 3958.50W 9 5/8" Casing Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised AlpWst 2ndryTgt Rvsd 354715.000,5968040.000,0.0000 7367.00 6710.42S 16890.63W 15-Mar-2001 CD2-33 (Alpine West) Phillips Alaska, Inc. CD~2 33~ slot ~33 Alpine Field North Slope, Alaska 3-D MINIMUM DISTANCE CLEARANCE REPORT INCLUDING POSITION UNCERTAINTIES by Baker Hughes INTEQ Your ref : 33 ~fVersion#11 Our ref : prop3683 License : Date printed : 6-Jun-2001 Date created : 22-Oct-1999 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Report is limited to clearances less than 500 feet Proximities will incorporate ellipses - when survey tools are defined for both wells. Ellipse separation in reverse brackets, e.g. )10.2(, where available. DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4* Object wellpath PMSS <0-11984'>,,35,CD#2 MWD <0-9507'>,,42PH,CD#2 MWD <8480 - 13138'>,,42,CD#2 MWD <0-???'>,,24PH,CD#2 Closest approach with 3-D Minimum Distance method Last revised Distance M.D. Diverging from M.D. 17-May-2001 )20.0( 180.0 180.0 27-May-2001 )89.5( 360.0 3322.2 31-May-2001 )89.5( 360.0 12460.0 4-Jun-2001 )86.9( 440.0 9280.0 Phillips Alaska, Inc. CD#2,33PB1 Alpine Field,North Slope, Alaska CLEA3~ANCE LISTING Page 1 Your ref : 33 PB1 Version#il Last revised : 5-Jun-2001 Reference wellpath Object wellpath : PMSS <0-11984'>,,35,CD#2 M.D. T.V.D. Rect Coordinates M.D. T.V.D. Horiz Min'm Ellipse Rect Coordinates Bearing Dist Sep'n 0.0 100.0 200.0 300.0 400.0 0.0 100.0 200.0 300.0 400.0 0.0S 0. ON 0. ON 0. ON 0. ON 0.0E 0.0E 0.0E 0.0E 0.0E 0.0 0.0 20.4S 2.6E 172.8 20.6 N/A 100.0 100.0 20.5S 2.6E 172.9 20.7 )20.2( 199.9 199.9 20.9S 2.5E 173.3 21.0 )20.0( 299.9 299.9 21.6S 2.1E 174.3 21.7 )20.1( 399.8 399.8 22.5S 2.1E 174.7 22.5 )20.5( Phillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 June 18,2001 Alaska Oil and Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 Re: Application for Permit to Ddll CD2-33 Dear Sirs: RECEIVED JUN 1 9 2001 Alaska Oil & Gas Cons. Commission Anchotoge . , Phillips Alaska, Inc. hereby applies for a permit to drill an onshore Alpine delineation well from the Alpine CD2 drilling pad. The intended spud date for this well is June 30, 2001. It is intended that Doyon Rig 19 be used to drill the well. CD2-33 is a extended reach well to designed to evaluate the western limit of the Alpine Reservoir (Alpine West prospect). The objectives of this well are the Alpine A & C. There are no plans to test this well, LWD logs and catching samples will be the geologic program. CD2-33 will be plugged and abandoned prior to sidetracking to the CD2-33A target, which will be permitted separately. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following · . , 5. 6. 7. 8. 9. 10. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). A proposed drilling program, including a request for approval of annular pumping operations. A drilling fluids program summary. Proposed pilot bore schematics. Proposed completion diagram. Proposed completion diagram with open hole isolation options. Pressure information as required by 20 ACC 25.035 (d)(2). CD2-33 Cementing Requirements. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. ORIGINAL If you have any questions or require further information, please contact Scott Reynolds at 265-6253 or Chip Alvord at 265-6120. Sincerely, Scott D. Reynolds Ddlling Engineer Attachments cc: CD2-33 Well File / Sharon AIlsup Drake Chip Alvord Cliff Crabtree Nancy Lambert Lanston Chin ATO 1530 ATO 868 ATO 848 Anadarko- Houston Kuukpik Corporation e-mail: Tomm~_Thompson@anadarko.com RECEIVED JUN I 9 Z001 Alaska 0il & Gas Cons. Commission Anchorage American Express' Cash AdvanceDraft 144 PAY TO THE ' · ~ o.o~. o~,~ , . ,.~ ~ "1 S Io0..00 ,~ ~ ,'DOLLARs , ..:: ,~ .~ ,.~ ,.~,~sr~.,.,.~. . . E~w~, ~o NOT MAUD FOA'ANOUNT OMEA $1~ Pa*, -- No~. ~k, G--d Juan- Do.town. N~ ~/S~ON/~U~~ PERIOD ENDING ri ~n -- ~% ~~ TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ~_~ ~_~ ~ ~>~..~ CHECK 1 CHECK WHAT APPLIES "CLUE" STANDARD LETTER DEVELOPMENT DEVELOPMENT REDRILL EXPLORATION INJECTION WELL INJECTION WELL REDRILL ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) PILOT HOLE (PH) ANNULA.R/DISPOSAL ANNULAR DISPOSAL ( , ) YES ANNULAR D1SPOSAL THIS WELL DISPOSAL INTO OTHER ANNULUS L~YES + SPACING EXCEPTION The permit is for a new weilbore segment of existing well , Permit No, ~ AP1 No. __. Production should continue to be reported as a function of the original API number stated above. In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and APl number (50 -70/80) from records, data and logs acquired for well (name on permit). ~ . , ~sfli has not been requeste~. Annular Disposal of drilling wastes will not be approved... Annular Disposal of drilling wastes will not be approved... Please note that an disposal of fluids generated... Enclosed is the approved application for permit to drill' the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Comoany Name) will assume the liability of any protest to the spacing exception that may occur. Templates are located Phillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 June 16, 2001 Alaska Oil and Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 Re: Application for Permit to Ddll CD2-33, CD2-33 PB1 & CD2-33 PB2 Dear Sirs: Phillips Alaska, Inc. hereby applies for a permit to drill an onshore production well from the Alpine CD2 drilling pad. The intended spud date for this well is June 30, 2001. It is intended that Doyon Rig 19 be used to drill the well. This well will consist of two reservoir evaluation pilot bore targets that will be abandoned and one CD2 pad horizontal development well. All 3 targets will share a common surface location and surface hole. The CD2-331~1~'1 is designed to penetrate the Alpine West target location that was dropped from the winter exploration drilling schedule do to this years shortened exploration season. CD2-339,Bl' will be plugged and abandoned prior to sidetracking to the CD2-33J;;~ target. CD2-33~ will be sidetracked off of the CD2-33,1~t~wellbore. The CD2-3~ target will be used to confirm the seismic interpretation of the Northwestern portion of the Alpine reservoir within the CD2 Pad development. CD2-33P;B2 will be plugged and abandoned prior to sidetracking to the final CD2-33 target ~ The CD2-33 horizontal producer will be sidetracked through a window milled in the 9- 5/8" surface casing. After milling out a window, the 8-1/2" intermediate hole will be drilled to the 7" casing point in the Alpine reservoir. After setting 7" intermediate casing, the horizontal section will be drilled and the well completed as an open hole producer. At the end of the work program, the well will be closed in awaiting the start-up of CD2 pad, which is tentatively scheduled for August 2001. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a). 2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). 3. A proposed drilling program, including a request for approval of annular pumping operations. 4. A drilling fluids program summary. 5. Proposed pilot bore schematics. 6. Proposed completion diagram. 7. Proposed completion diagram with open hole isolation options. 8. Pressure information as required by 20 ACC 25.035 (d)(2). 9. CD2-33PB1 & CD2-PB2 Cementing Requirements. 10. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the ddlling fluids handling system. If you have any questions or require further information, please contact Scott Reynolds at 265-6253 or Chip Alvord at 265-6120. ~Scott D. Reynolds Ddlling Engineer Attachments CC: CD2-33 Well File / Sharon AIIsup Drake Chip Alvord Cliff Crabtree Nancy Lambert LanSton Chin ATO 153O ATO 868 ATO 848 Anadarko - Houston Kuukpik Corporation e-mail: Tommy Thompson @ anadarko.com JUN 1 52001 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill X Redrill ] lb. Type of Well Exploratory Stratigr~phic Test Developn~ent Oil X Re-Entry Deepen! Service Development Gas Single Zone X Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Phillips Alaska, Inc. DF 52' feet Colville River Field 3. Address 6. Property Designation Alpine Oil Pool P. O. Box 100360, Anchora~le, AK 99510-0360 ADL 387207, ASRCNPRA02 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AA=C 25.025) 1894' FNL, 1522' FEL SEC. 2, T11N, R4E, UM Colville River Unit Statewide At target (=7" casing point ) 8. Well number Number 1658' FNL, 1301' EEL SEC. 3, T11N, R4E, UM CD2-33,]~'Dg~3RB..1,._~Z, #U-630610 At total depth 9. Approximate spud date Amount 978' FNL, 2566' FW/SEC. 3, T11 N, R4E, UM 06/30/2001 $200,000 12. Distance.to' nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and '['VD) Property line Alpine CD2- 24 13042' MD 978' S. of Sec 34 feet 1000'@ 13042' MD Feet 2560 7267' TVD feet T12N 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 500' feet Maximum hole angle 90.21 Maximum surface 2645 pslg At total depth (TVD) 3371 at pslg 7450' TVD.SS 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cemen! Hole Casin~ Weight Grade Coupling Length MD TVD MD TVD (include stage data) 42" 16" 62.5# H-40 Weld 77' 37' 37' 114' 114' Pre-installed 1"2.25'' 9.625" 40# L-80 BTC " 6463' 37' 37' 6500' 3730' 817 Sx Arcticset III L & ,,, , .................. ,,,,,, .... 230 Sx Class G 8.5" 7" 26# L-80 BTC-M 10005' 37' 37' 100~.'2' 7276' 138 sx Class G N/A 4.5" 12.6# L-80 IBT-M 9468, "' 32, 32' 9500' 7168' Tubing 19. To be completed for Redrill, Re-eniry, and Deepen Operations. ' ............ Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate Production , Liner JUN 1 5 2001 Perforation depth: measured true vertical Alaska Oil & Gas Cons. Commission 20. At'{achments ......... Fi'Jin~'"iee X Property plat soP Sketch Divert~i:~'k~VtSh~'' Drilling Program X' Drilling fluid program X Time vs depth plot Refraction analysis Seabed report 20 AAC 25.050 requirements X 21. f hereby certify tlC'at the foregoin~ is tr~u'e and correct t'~' the best of my knowledge .......... Sig~n'~d' "~-/'~'~ ~~ '~/ CommissionTitleu~e on,y Drillin~t Team Leader ......... Date 0~'//~"/0I ........ /Permit Num"ber. "~ I APl n.umber '------ I ~ Approval date ..... I see f01' cover letter ~ .~ / .-- /,2_ ~ "%. I 5o-/0.3' - -'~ o j'~/~./~I .I Other requirements Sa. mples required C6nditio~ns of approval /) Mud Icg required Hydrogen sulfide measure'~' y;; ......."~'~'~'~'---~ NODirectional survey required /,,"~) No No Required working pressure for DOPE ~ 2M 3M 5M 10M 15M Other: by order of Approved bit/ Commissioner the commission Date ......... Form 10-401 Rev. 7-24-89 0 R lklA L Submit tn triplicate CD2-33 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) lZ-114" HOle I t:l-bllS" t.;aslna inl:erv;ll Event Risk Level f4itigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low N/A Gas Hydrates Low Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, Iow mud temperatures Running Sands and Gravels Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps, run gravel isolation string. Abnormal Pressure in Low Diverter drills, increased mud weight Surface Formations >2000' TVD Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of Iow density cement slurries 8-1/2" Hole / CD2-",,=PD~P~& CD2-33 7" Casinq Interval ' .... g--iat ' Event Risk Level F4iti on Strategy Ab~'°rmal Pressure in Moderate BOPE' drills, Keep mud weight above 10.4 ppg. Surface Formations Check for flow during connections and if needed, >2000' TVD increase mud weight Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, m.~d rheology, lost circulation material ......... Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Abnormal Reservoir Low Well control drills, increased mud weight. Pressure Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices~ mud scavengers 6-1/8" Hole ! CD2-33 Horizontal Production Hole Event Risk Level Mitigation Strategy Lost circulation Low Reduced pUmp rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips High Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Abnormal Reservoir Medium BOPE drills, Keep mud weight above 9.3 ppg. Pressure Check for flow during connections and if needed, increase mud weight. Well control drills, increased mud weight. Alpine formation may be abnormally pressured due to gas injection from CD1-06. Horizontal section may be depleted causing lost circulation Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers Alpine; & CD2-33 ~1~r Summary. Procedure 1. 12-1/4" Surface Hole 1.1. Install diverter. Move on Doyon 19 & RU mud loggers. Function test diverter. 1.2. Drill 12 1/4 inch hole to the surface casing point ~ +/-6500' MD per the directional plan. Mud log entire section. 1.3. Run 9 5/8 surface casing with TAM port collar placed at +/- 1000' MD from surface. Cement %5/8" casing. 1.4. Install and test BOPE to 5000 psi. 1.5. Pressure test casing to 2500 psi. 2. ~,,.2-33~ (Alpine W~,est) 8-1/2" Hole Section. 2.1. '~d log entire 8-1/2' hole section. , 2.2. With~utoTrak (GR/Res), drill out 20 of new hole. Perform leak off test. Maximum 16 ppg EMW. 2.3. Drill"8 V~ole to the K1 at +/- 20151'MD. 2.4. POOH and lS~nteq mud motor & Anadrill MWD/LWD (GR/Res/Neut/Den). RIH to +/- 20151'Drill to TD of CD2-33PB~Alpine West) ~ 21417' MD. POOH and prep fo,' plug back. 2.5. RIH with 3-1/2"-"X'x 5'~ered drill string with mule shoe. 2.6. Set 1st balanced cement--pl~from 21417' to 20883.' POOH to 20883' and circulate clean. . 2.7. Pump 2nd balanced cement plu'~OOH to ,20683 and circulate clean. 2.8. POOH,to7400 and lay in hi-vis piI1~7300 MD Pump 3~d balanced cement plug (kick-off plug) and POOH to 681~0'. Circulate hole clean and POC~or sidetrack CD2-33PB2. 3. CD2-33?t12.8-1/2" Hole Section. 3.1. PU standard Alpine directional drilling BHA. In~Anadrill w/(GR/RES/NEUT/DENS) 3.2. RIH with drilling assembly. Dress-off plug #3. I<3~off at' +/- 7000' MDand drill sidetrack to TD approximately 1 ~339',,MD. POOH. 3.3. RIH with 3-1/2" x 5" tapered drill string with mUle shoe. 3.4. Set 1st balanced cement plug from 15339' to-- 7502'. POOH~_ to 75051~and__' circulate clean.,' 3.5. POOH and PU cement retainer. RIH to no less than 50' above, or n~ore than 100 above the shoe. Set retainer at approximately 6450' MD. 3.6. By the down squeeze method pump sufficient cement through the retainer to e~d 150' below (50' of casing volume plus 100' of 8.5'" open hole volume plus 50 % excess). Lay a 50' cement ~at~on top of the retainer. ~(W~eight test 7miner bef°re pumping cement J°b) -3.7. ~-v,OI I ~o 300 ~,rr~. P~,~3u~.'c~l~ ' ' t-Lfoe-C=~id . 4. CD2-33~8-1/2'' intermediate hole and 6-1/8" horizontal production hole. 4.1. RIH with casing scraper or gauge ring run on e-line to insure the casing is free of obstructions. 4.2. RU E-line and RIH with a bridge plug on a setting tool and GR/CCL. Log from 200' below to 200' above the planned bridge plug setting depth ~ +/- 3862' MD. 4.3. Set Bridge plug. Shut in well and test casing to 3500 psi for 30 minutes. 4.4. MU 9-5/8" Whipstock Assembly and RIH w/MWD to setting depth ~ 3862' MD. Orient whipstock and set. 4.5. Mill window in casing and approximately 38' of new hole. Perform FIT to maximum 16 ppg EMW. POOH for drilling assembly. 4.6. PU standard Alpine 8-1/2" drilling assembly with GR/Res and RIH. 4.7. Drill 8-1/2" hole to 7" casing point ~ 10041' MD. POOH to mn casing. 4.8. Run and cement 7 inch casing as per program. Top of cement + 500 feet MD above Alpine reservoir. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 4.9. BOPE test to 5000 psi. 4.10. Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW. 4.11. Drill 6 1/8" horizontal section to well TD ~ 13042' MI3. 4.11.1. Contingency - set open hole isolation equipment if required (due to unconsolidated formation or wellbore having moved out of the Alpine reservoir sand). 4.12. Displace well to brine and pull out of hole. 4.13. Run 4 1/2, 12.6#, L-80 IBT-Mod tubing with SSSV nipple, gas lift mandrels and production packer. Land hanger. 4.14. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 4.15. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 4.16. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 rains. 4.17. Shear out valve in lowermost gas lift mandrel. Circulate tubing to diesel and install freeze protection in the annulus. 4.18. Set BPV and secure well. Move fig off. Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD2-33 will be the closest well to CD2-42PH. Accounting for survey tool inaccuracies, the ellipse separation between these wells will be 13.6' at 8800' MD. Drillinq Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development wells. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumpinq Operations: Incidental fluids developed from drilling operations on well CD2-33 will be disposed of into the annulus of another permitted well on the CD2 pad or the CD1-19a Class II disposal well. This well will not be permitted for annular disposal. CD2-33 ,., ,.,,.,,-~,., ;'~,'; DRILLING FLUID PROGRAM SPUD to Intermediate hole to 7" Production Hole 9-5/8"surface casing casing point - 8 Y2" Section - 6 1/8" point - 12 ~" Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 9.2 ppg PV 10 - 25 10 -15 YP 20 - 60 15 - 25 25 - 30 Funnel Viscosity 100 - 200 Initial Gels 4 - 8 10 - 15 10 minute gels <18 12 - 20 APl Filtrate NC - 10 cc / 30 min 4 - 12 cc/30 min (drilling) HPHT Fluid Loss at 12 - 14 cc/30 min 160 8.5 - 9.0 9.0 - 10.0 9.0 - 9.5 PH 6 % KCL Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline viscosity at _+ 200 sec/qt while drilling to the base of the permafrost. Lower viscosity to 90 sec/qt from the base of the permafrost to TD of the surface hole. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole c~,.,.,,,,,,.,, ,-,.,,-.,-,,,,~ ,*,,.~ ~*~ .... ,,.,,,o ,.,,.,,. ,.,,.,,-,,, ,~-r,~-: & CD2 33 - Fresh water gel/polymer mud system. Ensure good hole cleaning by maintaining fluid rheology and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of Iow drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section: The horizontal production interval will be drilled with a M-I FIo-Pro drill-in fluid. The base fluid will consist of 6% KCI, with _+ 30PPB calcium carbonate bridging material to minimize formation damage. FIo-Vis Polymer and DuaI-FIo starch will be used for viscosity and fluid loss control respectively. Colville River Field ~ CD2-33~ (Alpine West) - Prior to Sidetracking RKB-GL=37' Updat.dO~}/1/2001 Wellhead 9-5/8" 40 ppf L-80 BTC Surface Casing @ 6500' MD / 3730' TVD cemented to surface Top of cement plug#3 (kick-off plug) dressed off to 7000' MD / 3857' TVD (+/- 75.35" inc.) 9.8 ppg drilling mud in hole Top Alpine Reservoir at 20883' MD / 7367' TVD CD2-33PB1 Hole TD at 21417' MD / 7502' TVD (+/- 75° inc.) 16" Conductor to 114' Top of Cement Plug #3 at +/- 6800' Bottom of Cement Plug #3 at +/- 7300' CemenI Plug Top of Cement Plug #2 at +/- 20683' 200' Above top of Alpine. 100' excess coverage over the required 100' Per AOGCC 20 AAC 25.107 & 25112 200 ~t -Top of Cement Plug #I at +/- 20883' 534 ft RKB- GL= 37' Colville River Field CD2-331{~BOx - Prior to Sidetracking to CD2-33 ~ Updated 0~3/1512001 Wellhead Bridge Plug se_t @ 3862' MD 9-5/8" 40 ppf L-80 BTC Surface Casing @ 6500' MD / 3730' TVD cemented to surface Cement Retainer set @ 6450' 16" Conductor to 114' Top of Cement Plug #2 at +/- 6400' Per AOGCC 20 AAC 26.107 & 25,112 (b)(1) Plug #2: Volumes Based on Casing Capacity & 50% excess in open hole Cement with C{ass G + additives @ t5.8 ppg. Slurry: 100' X 0.4340 [t3/ft = 44 It3 10@ X 0.3941 tt3/ft x 1,5 = 60 ft3 44 B3 + 60 ft3 = t04 ft3 => 89 Sx @ 1,17 B3/sk Bollom of Cement Plug #2 at +/- 6600' 9.8 ppg drilling mud in hole Top Alpine Reservoir at 14975' MD / 7339' TVD CD2-33PB2 Hole TD at 15339' MD / 7502' TVD (+/- 75o inc.) Cement Plug Top ol Cement Plug #1at +/- 14775' 200' Above top of Alpine, 100' excess coverage over the required t00' Per AOGCC 20 AAC 25.107 & 25.t 12 (s)(1) ~ Colville River Field CD2-33 Production Well Completion Plan 16" Conductor to 114' Updated 6/I4/01 4-1/2" Camco BAL-O SSSV Nipple (3.812' ID) at2000' TVD=2050' MB Isolation Sleeve with DB-6 No-Go Lock (3,812" OD) run in profile Dual 1/4" x 0,049" s/s control lines Window Milled in 9~5/8" 40 ppf L-80 BTC Surface Casing @ 3832' MD / 3055' TVD Camco KBG-2 GLM (3.909" ID) at 3400' TVD for E Dummy with 1" BK-2 Latch 4-1/2" 12.8 ppf L-80 IBT Mod. R3 tubing run with Jet Lube Run'n'Seal pipe dope WRDP-2 SSSV (2.125"1D) w/ DB-6 No-Go Lock (3.812" OD) - to be installed later Packer Fluid mix;. 9.6 ppq KCI Brine_ with 2000' TVD diesel cap Tubing Supended with diesel to lowest GLM Start thermal centralizers. 1 per joint from 4500' TVD to 2400' TVD Camco KBG-2 GLM (3.909" ID) at 5200' TVD for E Dummy with 1" BK~2 Latch Camco KBG-2 GLM (3.909" ID) & 1" Camco DCK-2 Shear Valve ~inned for casing side shear @ +/- 2000 psi set 2 ioints above the X landing nipple Completion MD TVD Tubing Hanger 32' 32' 4-1/2", 12,6#/ft, IBT-Mod Tubing Camco BAL-O SSSV Nipple 2050' 2000' End thermal centralizers 2527' 2400' 4-1/2", 12,6#/ft, lB%Mod Tubing Camco KBG-2 GLM (3,909" ID) 4621' 3400' 4-1/2", 12.6#/ft, IBT-Mod Tubing Start thermal centralizers. 6050' 4500' (1 per joint) Camco KBG-2 GLM (3.909" ID) 6915' 5200' 4-1/2", t2,6#/ft, tBT*Mod Tubing Camco KBG-2 GLM (3,909" ID) 9820' 4-1/2" tubing ioints (2) {R3) HES "X" (3.813" ID) 9902' 4-1/2" tubing joint (1)(R3) Baker S3 Packer 9444' 4-1/2" tubing joint (1)(R3) HES "XN" (3.725" ID) 9489' 4-1/2" 10' pup joint WEG (+/- 65.1 des) 9500' 7168' Baker S3 Packer at +/- 9444~ TOC @ +F 9249' M (500' MD above top Alpine) Top Alpine at 9749' MD / 7252' TVD 7" 26 ppf L-80 BTC Mod Production Casing @ 10042' MD/7276' TVD (¢ 90.21 des Well TD at 13042' MD / 7267' TVD %Colville River Field CD2-33~ Production Well Completion Plan Formation Isolation Contingency Options Updated 06/] 4/0] 16" Conductor to 114' 4-1/2" Camco BAL-O SSSV Nipple (3.812" ID). WRDP-2 SSSV (2.25" ID) and DB-6 No-Go Lock (3.812" OD) with dual 1/4" x 0.049" s/s control line @ 2000' TVD Window Milled in 9-5/8" 40 ppf L-80 BTC Surface Casing @ 3832' MD / 3055' TVD Camco KBG-2 GLM (3.909" ID) at 3400' TVD for E Dummy wilh 1" 8K-2 Latch 4-1/2" 12.6 ppf L-80 IBT Mod. R3 tubin9 run with Jet Lube Run'n'Seal pipe dope Start thermal centralizers, 1 per joint from 4500' TVD to 2400' TVD Camco KBG-2 GLM (3.909" ID) at 5200' TVD for E Bummy with 1" BK-2 Latch ~A) Bonzai ECP Aesembly~ - Baker ZXP Packer (4.75" ID) - Baker HMC Liner Hanger - XO to IBT-Mod - blank 4-1/2" joints (TBD) - Cementing Valve - Baker Payzone ECP (mud inflated) -Landing Collar - 4-1/2" joint (1- 2) blank - Guide Shoe ~) Open Hole Scab Liner_ Baker Payzone ECP (cement inflated) - 4-1/2" joints (TBD) blank tbg Baker Payzone ECP (cement inflated) - Baker Model XL-10 ECP (anchor) - Muleshoe / Entry Guide (C) Open Hole B~e Plug Assembly_ Baker Payzone ECP (cement inflated) -XO -Float Collar ~ 4-1/2" Float Shoe TOC cC +/- 9249' MD (500' MD above lop Alpine) Camco KBG-2 GLM (3.909" ID) & 1" Camco DCK-2 Shear Valve Pinned for casin9 side shear @ 2000 psi set 2 ioints above the X landin9 nipple Baker S3 Packer at +/- 9444' Well TD at 13042' MD / 7267' TVD 7" 26 ppf L-80 BTC Mod Production Casing @ 10042' MD / 7276' TVD @ 90.21 deg CD2-33 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well - Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114/114 10.9 52 53 9 5/8 Window 3832 / 3055 14.5 1383 (0.4525 psi/ft)1998 7" 10042 / 7287 16.0 3298 (o.4525 psi/ft)2565 N/A 13042 / 7276 16.0 3293 (0.4525 psi/ft)N/A · NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP: [(FG x 0.052) - 0.1ID Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP= FPP - (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 1. Drilling below conductor casing (16") ASP = [(FG x 0.052)-0.1} D = [(10.9 x 0.052) -0.1] x 114 - 53 psi OR ASP = FPP - (0.1 x D) = 1383- (0.1 x 3055') = 1078 psi 2. Drilling below surface casing (9 5/8" Window) ASP = [(FG x 0.052) - 0.1} D = [(14.5 x 0.052) - 0.1] x 3055 = 1998 psi OR ASP = FPP - (0.1 x D) = 3298 - (0.1 x 7287') = 2569 psi 3. Drilling below intermediate casing (7") ASP = FPP - (0.1 x D) = 3293- (0.1 x 7276') = 2565 psi CD2-33PB1 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well · Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114/114 10.9 52 53 9 5/8 6500 / 3730 14.5 1688 (0.4525 psi/ft)2440 8-1/2" hole TD 21417 / 7502 16.0 3395/0.4525 psi/ft) N/A · NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 3) ASP = [(FG x 0,052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from Ib./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 4) ASP= FPP- (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 2. Drilling below conductor casing (16") ASP = [(FG x 0.052)-0.1} D = [(10.9 x 0.052)- 0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1688 - (0.1 x 3730') = 1315 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1} D = [(14.5 x 0.052) - 0.1] x 3730' = 2440 psi OR ASP = FPP - (0.1 x D) = 3395- (0.1 x 7502') = 2645 psi CD2-33PB2 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well · Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114/114 10.9 52 53 9 5/8 6500 / 3730 14.5 1688 (0.4525 psi/ft)2440 8-1/2" hole TD 15339 / 7502 16.0 3395 (0.4525 psi/ft)N/A · NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 5) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in p$i/ft D = true Vertical depth of casing seat in ft RKB OR 6) ASP= FPP- (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 3. Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1} D = [(10.9 x 0.052) - 0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1688 - (0.1 x 3730') = 1315 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052)-0.1} D = [(14.5 x 0.052) - 0.1] x 3730' = 2440 psi OR ASP = FPP - (0.1 x D) = 3395 - (0.1 x 7502') = 2645 psi Alpine, CD2-33PB1 Cementin.q Requirements CD2-33PB1 Cement Plug #1: 21417' MD to 20883' MD = 534'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 534' X 0.3941 ft3/ft X 1.15 (15% excess) = 242 ft3 => 210 Sx @ 1.16 ft~/sk CD2-33PB1 Cement Plug #2: 20883' MD to 20683' MD = 200'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 200' X 0.3941 ft~/ft X 1.15 (15% excess) = 90.6 ft~ => 80 sx @ 1.16 ft~/sk CD2-33PB1 Cement Plug #3 (Kick-Off Plug): 7300' MD to 6800' MD -- 500'. Cement with Class G + additives @ 17 ppg. Assume 15% excess on open hole volume. Slurry: 500'X 0.3941 ft3/ft X 1.15 (15% excess) = 227 ft~ => 227sx @ 1.00 ft~/sk Alpine, CD2-33PB2 Cementin.q Requirements CD2-33PB2 Cement Plug #1: 15339' MD to 14775' MD = 564'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 564' X 0.3941 ft~/ft X 1.15 (15% excess) = 256 ft~ => 220 Sx @ 1.16 ft3/sk CD2-33PB2 Cement Plug #2: 6600' MD to 6400' MD = 200'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 200' X 0.3941 ft~/ft X 1.15 (15% excess) = 90.6 ft3 => 80 sx @ 1.16 ft~/sk Phdhps Alaska, Inc. Structure : C0#2 Well : 33PSl '~ Field : Alpine Field Locofion : North Slope, Aioskoi <- West (feet) 248.33 AZI~vIUTH t8175' (TO PB1 TAi~GET) 17600 16500 ~ 6000 1520O 1440O 13800 128OO 12000 11200 10400 9600 8800 8000 7200 04O0 560o 4800 4000 3200 24O0 1600 800 0 2D2-33 TO ] [~,TD - Cs9 Pt, % d: LOCATION: LOCATION: 1953" FSL, 2579' FEL · SEC. 8, Tll CD2-53PB2 TD LOCATION: 1297' FSL, 289' FEL SEC, 9, T11N, R4E 800 0 8OO 2700- 5000 ~ 6600 6900 7200 7500- 7aO0- 61.74 55.96 9 5/8 Cosin9 331.86 AZIMUTH 863' (TO TARGET) TANGENT ANGLE 36.06 DEG 386441.0g ~' TARGET ANGLE ~7.5 ~' 90.21 DEG 51,41 K--1 ~,~' 300 0 Verficcll Section (feet) -> Azfmufh 331.86 with reference 0.00 S, 0.00 E {rom stol #$3 Phillips Alaska, Inc. Sfrucfure: CD#2 Well : 33 B Field : Alpine Field Locefion : Norfh Slope, Alosk~ PROFILE Point MD Inc KOP - Sidetrack Pt. 3831.77 75.35 EOC 5201.27 36.06 K-5 5247.04 36.06 K-2 5519.1 7 56.06 Albian-97 7117.32 56.06 Albion-g6 7939.90 56,06 Begin Final BId/Trn 8452.51 56.06 HRZ 9001.20 44,14 K-1 9195.49 51.23 LCU 9426.70 61.04 Miluveach A 9628.08 70.30 Alpine D 9675.14 72.52 Alpine 9748.97 76.04 Target- EOC - Csg P 10041.37 90.21 TD - Csq Pt. 15041.71 90.21 COMMENT DATA Dir TVD North East 248.35 3055.44 -619.52 -1559.39 255.05 .3815.00 -1128.41 -2559.51 255.05 5852.00 -1144.60 -2561.04 255.05 4072.00 -1240.89 -2689.05 255,05 5564.00 -1806.59 -5440.72 255.05 6029.00 -2097.45 -5827.62 255.05 6445.25 -2278.77 -4068.64 285.85 6874.00 -2551.64 -4592.27 296.59 7005.00 -2281.65 -4526.26 508.24 7154.00 -2178.46 -4687.24 51 6.77 7217.00 -2054.40 -4821.86 .318.61 7252.00 -2021.41 -4851.88 521.40 7252.00 - 1966.97 -4897.53 531.86 7287.00 -1725.26 -5056.23 551.86 7276.00 920.41 -6471.27 V. Sect 189.16 202.68 198.55 174.00 29.87 -44.32 -90.55 15.48 122.77 289.67 462.56 505.80 575.,54 86.5.32 5863.64 Deg/1 O0 0.00 3.00 0.00 0.00 0.00 0.00 0.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0.00 310 3OO 290 280 27O 2 26O 25O 240 230 Phillips Alaska, Inc. Structure: CD#2 Wsll: $3 ~ 340 ...... ~30 320 "~ TRUE NORTH 550 0 10 2O 210 50 40 5O 220 140 210 /~oo 150 200 ~ i 60 1~)oo 180 170 Normal Plane Travelling Cylinder - Feet All depths shown are Measured depths on Reference Well 6O 7O 120 130 8O 90 100 110 CD2-33 HO~I,.ONTAL PRODUCER STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 Version#Il Our ref : prop4577 License : Date printed : 5-Jun-2001 Date created : 20-Mar-2001 Last revised : 4-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33 HOR~'I,.ONTAL PRODUCER STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33 Alpine Field,North Slope, Alaska Measured Inclin. Depth Degrees 0.00 0.00 100.00 0.00 200.00 0.00 300.00 0.00 400.00 0.00 500.00 0.00 600.00 1.00 700.00 2.00 800.00 3.00 900.00 4.00 1000.00 6.00 1100.00 8.00 1200.00 10.00 1300.00 12.00 1400.00 14.00 1500.00 16.00 1600.00 18.00 1700.00 20.00 1800.00 22.00 1900.00 24.00 2000.00 26.00 2100.00 28.00 2200.00 30.00 2299,99 33.00 2399.99 36.00 2499.99 39.00 2599.99 42.00 2699.99 45.00 2799,99 48.00 2899,99 51.00 2999.99 54.00 3099.99 57.00 3199,99 60.00 3299.99 63.00 3399,99 66.00 3499.99 69.00 3599,99 72.00 3699.99 75.00 3711.77 75.35 3831,77 75.35 3900,00 73.36 4000.00 70.45 4100,00 67.54 4200.00 64.64 4300.00 61.74 4400.00 58.84 4500.00 55.96 4600.00 53.08 4700.00 50.21 4800.00 47.35 Azimuth True Vert R E C T A N G U L A R Degrees Depth C 00 R D I N A T E S 0.00 0.00 0.00S 0.00E 248.33 100.00 0.00S 0.00E 248.33 200.00 0.00S 0.00E 248.33 300.00 0.00S 0.00E 248.33 400.00 0.00S 0.00E 248.33 500.00 0.00S 0.00 E 248.33 599.99 0.32S 0.81 W 248.33 699.96 1.29S 3,24 W 248.33 799.86 2.90S 7.30 W 248.33 899.68 5.15S 12.97W 248.33 999.29 8.37 S 21.07W 248.33 1098.54 12.87S 32.40W 248.33 1197.30 18.65S 46.93W 248.33 1295.46 25.69S 64.66W 248.33 1392.89 34.00S 85.57W 248.33 1489.48 43.55S 109.62W 248.33 1585.11 54.34S 136.79W 248.33 1679.65 66.36S 167.05W 248.33 1773.01 79.60S 200.35W 248.33 1865.05 94.02S 236.66W 248.33 1955.68 109.62S 275.93W 248.33 2044.77 126.38S 318.12W 248.33 2132.23 144.28S 363.18W 248.33 2217.48 163.57S 411.73W 248.33 2299.88 184.48S 464.36W 248,33 2379.21 206.95S 520.93W 248.33 2455.24 230.93S 581.27W 248.33 2527.77 256.34S 645.24W 248.33 2596.60 283.12S 712.64W 248.33 2661.54 311.19S 783.30W 248.33 2722.41 340.48S 857.02 W 248.33 2779.04 370.90S 933.60 W 248.33 2831.29 402.38S 1012.83W 248.33 2879.00 434.82S 1094.50W 248.33 2922.04 468.14S 1178.37W 248.33 2960.31 502.25S 1264.22W 248.33 2993.69 537.05S 1351.81W 248.33 3022.09 572.45S 1440.91W 248.33 3025.10 576.65S 1451.49W 248.33 3055.44 619.52S 1559.39W 247.83 3073.84 644.04S 1620.34W 247.07 3104.89 680.49S 1708.12W 246.28 3140.73 717.44S 1793.84W 245.46 3181.25 754,79S 1877.26W 244.60 3226.35 792,45S 1958.17W 243.69 3275.91 830.32S 2036.33W 242.73 3329.78 868,27S 2111.53W 241.69 3387.82 906,22S 2183.56W 240.58 3449.87 944,06S 2252.23W 239.37 3515.76 981,68S 2317.35W PROPOSAL LISTING Page 1 Your ref : 33 Version~ll Last revised : 4-Jun-2001 Dogleg Vert Deg/100ft Sect 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.10 1.00 0.39 1.00 0.89 1.00 1.57 2.00 2.56 2.00 3.93 2.00 5.69 2.00 7.84 2.00 10.38 2.00 13.30 2.00 16.59 2.00 20.26 2.00 24.30 2.00 28.71 2.00 33.47 2.00 38.59 2.00 44.06 3.00 49.94 3.00 56.33 3.00 63.19 3.00 70.51 3.00 78.27 3.00 86.45 3.00 95.02 3.00 103.96 3.00 113.25 3.00 122.86 3.00 132.77 3,00 142.94 3.00 153.36 3.00 163.98 3.00 174.79 3.00 176.07 0.00 189.16 KOP - Sidetrack Pt. 3.00 196.28 3.00 205.54 3.00 213.39 3.00 219.79 3.00 224.74 3.00 228.22 3.00 230.21 3.00 230.72 3.00 229.75 3.00 227.28 Ail data is in feet unless otherwise stated. Coordinates from slot ~33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 6536.41 on azimuth 278.10 degrees from wellhead. Total Dogleg for wellpath is 211.78 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.86 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33 HOR'i~ONTAL PRODUCER STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33 Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth 4900.00 44.51 238.04 3585.31 5000.00 41.68 236.57 3658.33 5100.00 38.87 234.92 3734.62 5200.00 36.09 233.07 3813.97 5201.27 36.06 233.05 3815.00 5247.04 36.06 233.05 3852,00 5500.00 36.06 233.05 4056.50 5519.17 36.06 233.05 4072,00 6000.00 36.06 233.05 4460.72 6500.00 36.06 233.05 4864,94 7000.00 36.06 233.05 5269,15 7117.32 36.06 233.05 5364,00 7500.00 36.06 233.05 5673,37 7939.90 36.06 233.05 6029,00 8000.00 36.06 233.05 6077,59 8452.31 36.06 233.05 6443,25 8500.00 35.80 237.90 6481.87 8600.00 35.92 248.15 6562.99 8700.00 36.88 258.14 6643.55 8800.00 38.64 267.52 6722.67 8900.00 41.09 276.07 6799.48 9000.00 44.10 283.75 6873.14 9001.20 44.14 283.83 6874.00 9100.00 47.57 290.57 6942.84 9195.49 51.23 296.39 7005.00 9200.00 51.41 296.65 7007.82 9300.00 55.52 302.09 7067.37 9400.00 59.85 307.00 7120.83 9426.70 61.04 308.24 7134.00 9500.00 64.36 311.49 7167.62 9600.00 68.98 315.65 7207.23 9628.08 70.30 316.77 7217.00 9675.14 72.52 318.61 7232.00 9700.00 73.71 319.56 7239.22 9748.97 76.04 321.40 7252.00 9800.00 78.50 323.29 7263.24 9900.00 83.33 326.88 7279.04 10000.00 88.19 330.41 7286.42 10041.37 90.21 331.86 7287.00 10041.39 90.21 331.86 7287.00 10500.00 90.21 331.86 7285.32 11000.00 90.21 331.86 7283.49 11500.00 90.21 331.86 7281.65 12000.00 90.21 331.86 7279.82 12500.00 90.21 331.86 7277.99 13000.00 90.21 331.86 7276.15 13041.71 90.21 331.86 7276.00 13041.73 90.21 331.86 7276,00 PROPOSAL LISTING Page 2 Your ref : 33 Version~ll Last revised : 4-Jun-2001 R E C T A N G U L A R Dogleg Vert C 0 0 R D I N A T E S Deg/100ft Sect 1018.98S 2378.74W 3.00 223.35 1055,86S 2436.24W 3.00 217.94 1092.22S 2489.67W 3.00 211.08 1127.96S 2538.91W 3.00 202.79 1128.41S 2539.51W 3.00 202.68 EOC 1144.60 S 2561.04 W 0.00 198.55 K-3 1234.11 S 2680.02 W 0.00 175.73 1240.89 S 2689.03 W 0.00 174.00 K-2 1411.03 S 2915.19 W 0.00 130.64 1587.95 S 3150.37 W 0.00 85.54 1764.88 S 3385.54 W 0.00 40.45 1806.39 S 3440.72 W 0.00 29.87 Albian-97 1941.80 S 3620.72 W 0.00 -4.64 2097.45 S 3827.62 W 0.00 -44.32 Albian-96 2118.72 S 3855.89 W 0.00 -49.74 2278.77 S 4068.64 W 0.00 -90.53 Begin Final Bld/Trn 2294.62S 4091.67W 6.00 -93.65 2321.10S 4143.73W 6.00 -92.45 2338.20S 4200.37W 6.00 -80.81 2345.72S 4260.99W 6.00 -58.86 2343.60S 4324.92W 6.00 -26.83 2331.84S 4391.45W 6.00 14.92 2331.64S 4392.27W 6.00 15.48 HRZ 2310.58S 4459.87W 6.00 65.93 2281.63S 4526.26W 6.00 122.77 K-1 2280.06S 4529.42W 6.00 125.64 2240.60S 4599.33W 6.00 193.41 2192.64S 4668.84W 6.00 268.49 2178.46S 4687.24W 6.00 289.67 LCU 2136.70S 4737.20W 6.00 350.05 2073.40S 4803.65W 6.00 437.21 2054.40S 4821.86W 6.00 462.56 Miluveach A 2021.41S 4851.88W 6.00 505.80 Alpine D 2003.43S 4867.46W 6.00 529.00 1966.97S 4897.53W 6.00 575.34 Alpine 1927.56 S 4927.93 W 6.00 624.43 1846.62 S 4984.41 W 6.00 722.44 1761.49 S 5036.26 W 6.00 821.96 1725.26 S 5056.23 W 6.00 863.32 Target - EOC - Csg Pt 1725.25 S 5056.24 W 6.00 863.34 CD2 Tgt52 Heel Rvsd 26-Oct-00 1320.85 S 5272.54 W 0.00 1321.95 879.95 S 5508.35 W 0.00 1821.95 439,06 S 5744.16 W 0.00 2321.94 1.84 N 5979.98 W 0.00 2821.94 442,73 N 6215.79 W 0.00 3321.94 883.63 N 6451.60 W 0.00 3821.93 920.41 N 6471.27 W 0.00 3863.64 TD - Csg Pt. 920.43 N 6471.28 W 0.00 3863.67 CD2 Tgt52 Toe Rvsd 26-Oct-00 Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level), Bottom hole distance is 6536.41 on azimuth 278.10 degrees from wellhead. Total Dogleg for wellpath is 211.78 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.86 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33 HORi,.ONTAL PRODUCER STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33 A1Dine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 Version#il Last revised : 4-Jun-2001 Comments in wellpath MD TVD Rectangular Coords. Comment 3831.77 3055.44 619.52 S 1559 39 W KOP - Sidetrack Pt. 5201.27 3815.00 1128.41S 5247.04 3852.00 1144.60S 5519.17 4072.00 1240.89S 7117.32 5364.00 1806.39S 7939.90 6029.00 2097.45S 8452.31 6443.25 2278.77S 9001.20 6874.00 2331.64S 9195.49 7005.00 2281.63S 9426.70 7134.00 2178.46S 9628.08 7217.00 2054.40S 9675.14 7232.00 2021.41S 9748.97 7252.00 1966.97S 10041.37 7287.00 1725.26S 10041.39 7287.00 1725.25S 13041.71 7276.00 920.41 N 13041.73 7276.00 920.43 N 2539 51 W 2561 04 W 2689 03 W 3440 72 W 3827 62 W 4068 64 W 4392 27 W 4526.26 W 4687.24 W 4821.86 W 4851.88 W 4897.53 W 5056.23 W 5056.24 W 6471.27 W 6471.28 W EOC K-3 Albian-97 Albian-96 Begin Final Bld/Trn HRZ K-1 LCU Miluveach A Alpine D Alpine Target - EOC - Cst Pt CD2 Tgt52 Heel Rvsd 26-0ct-00 TD - Cst Pt. CD2 Tgt52 Toe Rvsd 26-0ct-00 Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bog TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 4864.94 1587.95S 3150.37W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised CD2 Tgt52 Heel Rvsd 366631.000,5972824.000,0.0000 7287.00 1725.25S 5056.24W 15-Oct-1997 CD2 Tgt52 Toe Rvsd 2 365261.000,5975493.000,2.0000 7276.00 920.43N 6471.28W 15-Oct-1997 CD2-33 HoR{I',.ONTAL PRODUCER COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 Version#il Our ref : prop4577 License : Date printed : 5-Jun-2001 Date created : 20-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33 HoR~I,~ONTAL PRODUCER COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33 Alpine Field,North Slope, Alaska Measured Inclin Azimuth True Vert Depth Degrees Degrees Depth 0,00 0.00 0,00 0.00 100.00 0.00 248.33 100.00 200.00 0.00 248.33 200.00 300.00 0.00 248.33 300.00 400.00 0.00 248.33 400.00 500.00 0.00 248.33 500.00 600.00 1.00 248.33 599.99 700.00 2.00 248.33 699.96 800.00 3.00 248.33 799.86 900.00 4.00 248.33 899.68 1000.00 6.00 248.33 999.29 1100.00 8.00 248.33 1098.54 1200.00 10.00 248.33 1197.30 1300.00 12,00 248.33 1295.46 1400.00 14.00 248.33 1392.89 1500.00 16.00 248.33 1489.48 1600.00 18.00 248.33 1585.11 1700.00 20.00 248.33 1679.65 1800.00 22.00 248.33 1773.01 1900.00 24.00 248.33 1865.05 2000.00 26.00 248.33 1955.68 2100.00 28.00 248.33 2044.77 2200.00 30.00 248.33 2132.23 2299.99 33.00 248.33 2217.48 2399.99 36.00 248.33 2299.88 2499.99 39.00 248.33 2379.21 2599.99 42.00 248.33 2455.24 2699.99 45.00 248.33 2527.77 2799.99 48.00 248.33 2596.60 2899.99 51.00 248.33 2661.54 2999.99 54,00 248.33 2722.41 3099.99 57,00 248.33 2779.04 3199.99 60,00 248.33 2831.29 3299.99 63.00 248.33 2879.00 3399.99 66,00 248.33 2922.04 3499.99 69,00 248.33 2960.31 3599.99 72,00 248.33 2993.69 3699.99 75.00 248.33 3022.09 3711.77 75,35 248.33 3025.10 3831.77 75,35 248.33 3055.44 3900.00 73,36 247.83 3073.84 4000.00 70,45 247.07 3104.89 4100.00 67.54 246.28 3140.73 4200.00 64.64 245.46 3181.25 4300.00 61,74 244.60 3226.35 4400.00 58,84 243.69 3275.91 4500.00 55,96 242.73 3329.78 4600.00 53.08 241.69 3387.82 4700.00 50.21 240.58 3449.87 4800.00 47,35 239.37 3515.76 PROPOSAL LISTING Page 1 Your ref : 33 Version#il Last revised : 5-Jun-2001 RECTANGULAR GRID COO R D S GEOGRAPHIC C O O R D I N A T E S Easting Northing C O O R D I N A T E S 0.00S 0.00S 0.00S 0.00S 0.00S 0.00S 0.32S 1.29S 2.90S 5.15S 8.37S 12.87S 18.65S 25.69S 34.00S 43.55S 54.34S 66.36S 79.60S 94.02S 109.62S 126.38S 144.28S 163.57S 184.48S 206.95S 230.93S 256.34S 283.12S 311.19S 340.48S 370.90S 402.38S 434.82S 468.14S 502.25S 537.05S 572.45S 576.65S 619.52S 644,04S 680.49S 717.44S 754.79S 792.45S 830.32S 868.27S 906.22S 944.06S 981.68S 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715,27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.81W 371714.45 5974463.08 n70 20 18.47 w151 2 27.46 3,24W 371712.01 5974462.15 n70 20 18.46 w151 2 27.53 7.30W 371707.93 5974460.61 n70 20 18.45 w151 2 27.65 12.97W 371702.22 5974458.45 n70 20 18.42 w151 2 27.82 21.07W 371694.06 5974455.37 n70 20 18.39 w151 2 28.05 32.40W 371682.67 5974451.07 n70 20 18.35 w151 2 28.38 46.93W 371668.03 5974445.54 n70 20 18.29 w151 2 28.81 64.66W 371650.19 5974438.79 n70 20 18.22 w151 2 29.33 85.57W 371629.15 5974430.84 n70 20 18.14 w151 2 29.94 109.62W 371604.94 5974421.70 n70 20 18.05 w151 2 30.64 136.79W 371577.59 5974411.37 n70 20 17.94 w151 2 31.43 167.05W 371547.14 5974399.86 n70 20 17.82 w151 2 32.32 200.35W 371513.62 5974387.19 n70 20 17.69 w151 2 33.29 236.66W 371477.07 5974373.39 n70 20 17.55 w151 2 34.35 275.93W 371437.55 5974358.45 n70 20 17.40 w151 2 35.50 318.12W 371395.08 5974342.41 n70 20 17.23 w151 2 36.73 363.18W 371349.74 5974325.27 n70 20 17.06 w151 2 38.04 411.73W 371300.87 5974306.81 n70 20 16.87 w151 2 39.46 464.36W 371247.90 5974286.80 n70 20 16.66 w151 2 41.00 520.93W 371190.96 5974265.28 n70 20 16.44 wl51 2 42.65 581.27W 371130.22 5974242.33 n70 20 16.20 w151 2 44.41 645.24W 371065.84 5974218.01 n70 20 15.95 w151 2 46.28 712.64W 370998.00 5974192.38 n70 20 15.69 w151 2 48.25 783.30W 370926.88 5974165.51 n70 20 15.41 w151 2 50.31 857.02W 370852.68 5974137.47 n70 20 15.12 w151 2 52.47 933.60W 370775.61 5974108.35 n70 20 14.82 wlS1 2 54.70 1012.83W 370695.86 5974078.22 n70 20 14.51 w151 2 57.02 1094.50W 370613.67 5974047.16 n70 20 14.20 w151 2 59.40 1178.37W 370529.25 5974015.27 n70 20 13.87 w151 3 01.85 1264.22W 370442.85 5973982.62 n70 20 13.53 w151 3 04.36 1351.81W 370354.68 5973949.31 n70 20 13.19 w151 3 06.92 1440.91W 370265.01 5973915.43 n70 20 12.84 w151 3 09.52 1451.49W 370254.36 5973911.40 n70 20 12.80 w151 3 09.83 1559.39W 370145.76 5973870.37 n70 20 12.38 w151 3 12.98 1620.34W 370084.41 5973846.88 n70 20 12.14 w151 3 14.76 1708.12W 369996.03 5973811.93 n70 20 11.78 w151 3 17.32 1793.84W 369909.71 5973776.43 n70 20 11.41 w151 3 19.82 1877.26W 369825.67 5973740.49 n70 20 11.05 w151 3 22.26 1958.17W 369744.15 5973704.21 n70 20 10.67 w151 3 24.62 2036.33W 369665.37 5973667.68 n70 20 10.30 w151 3 26.90 2111.53W 369589.54 5973631.00 n70 20 09.93 w151 3 29.10 2183.56W 369516.88 5973594.28 n70 20 09.55 w151 3 31.20 2252.23W 369447.59 5973557.61 n70 20 09.18 w151 3 33.21 2317.35W 369381.85 5973521.10 n70 20 08.81 w151 3 35.11 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 6536.41 on azimuth 278.10 degrees from wellhead. Total Dogleg for wellpath is 211.78 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.86 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33 HOR1z~ONTAL PRODUCER COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33 Alpine Field,North Slope, Alaska Measured Inclin Azimuth True Vert Depth Degrees Degrees Depth 4900.00 44.51 238.04 3585.31 5000.00 41.68 236.57 3658.33 5100.00 38.87 234.92 3734.62 5200.00 36.09 233.07 3813.97 5201.27 36.06 233.05 3815.00 5247.04 36.06 233.05 3852.00 5500.00 36.06 233.05 4056.50 5519.17 36.06 233.05 4072.00 6000.00 36.06 233.05 4460.72 6500.00 36.06 233.05 4864.94 7000,00 36.06 233.05 5269.15 7117,32 36.06 233.05 5364.00 7500.00 36.06 233.05 5673.37 7939,90 36.06 233.05 6029.00 8000.00 36.06 233.05 6077.59 8452.31 36.06 233.05 6443.25 8500.00 35.80 237.90 6481.87 8600,00 35.92 248.15 6562.99 8700,00 36.88 258.14 6643.55 8800.00 38.64 267.52 6722.67 8900,00 41.09 276.07 6799.48 9000.00 44.10 283.75 6873.14 9001,20 44.14 283.83 6874,00 9100,00 47.57 290.57 6942.84 9195.49 51.23 296.39 7005.00 9200.00 51.41 296.65 7007.82 9300.00 55.52 302.09 7067.37 9400.00 59.85 307.00 7120.83 9426.70 61.04 308.24 7134.00 9500.00 64.36 311.49 7167.62 9600,00 68.98 315.65 7207.23 9628.08 70.30 316.77 7217.00 9675.14 72.52 318.61 7232.00 9700.00 73.71 319.56 7239.22 9748.97 76.04 321.40 7252.00 9800.00 78.50 323.29 7263.24 9900.00 83.33 326.88 7279.04 10000.00 88.19 330.41 7286.42 10041,37 90.21 331.86 7287.00 10041.39 90.21 331.86 7287.00 10500.00 90.21 331.86 7285.32 11000.00 90.21 331.86 7283.49 11500.00 90.21 331.86 7281.65 12000.00 90.21 331.86 7279.82 12500.00 90.21 331.86 7277.99 13000.00 90.21 331.86 7276.15 13041.71 90.21 331.86 7276.00 13041.73 90.21 331.86 7276.00 PROPOSAL LISTING Page 2 Your ref : 33 Version#Ii Last revised : 5-Jun-2001 RECTANGULAR GRID COORDS GEOGRAPHIC COORDINATES Easting Nor~hing COORDINATES 1018.98S 1055.86S 1092.22S 1127.96S 1128.41S 1144.60S 1234.11S 1240.89S 1411.03S 1587.95S 1764.88S 1806.39S 1941.80S 2097.45S 2118.72S 2278.77S 2294.62S 2321.10S 2338.20S 2345.72S 2343.60S 2331.84S 2331.64S 2310.58S 2281.63S 2280.06S 2240.60S 2192.64S 2178.46S 2136.70S 2073.40S 2054.40S 2021.41S 2003.43S 1966.97S 1927.56S 1846.62S 1761.49S 1725.26S 1725.25S 1320.85S 879.95S 439.06S 1.84N 442.73N 883.63N 920.41N 920.43N 2378.74W 369319.84 5973484.85 nT0 20 08.45 wlS1 3 36.90 2436.24W 369261.73 5973448.95 n70 20 08.08 wlS1 3 38.58 2489.67W 369207.69 5973413.50 n70 20 07.72 w151 3 40.14 2538.91W 369157.86 5973378.60 n70 20 07.37 w151 3 41.58 2539.51W 369157.26 5973378.16 n70 20 07.37 w151 3 41.59 2561.04W 369135.46 5973362.33 n70 20 07.21 wlS1 3 42.22 2680.02W 369014.99 5973274.86 n70 20 06.33 w151 3 45.69 2689.03W 369005.87 5973268.23 n70 20 06.26 w151 3 45.96 2915.19W 368776.88 5973101.95 n70 20 04.59 w151 3 52.56 3150.37W 368538.77 5972929.04 n70 20 02.84 w151 3 59.42 3385.54W 368300.66 5972756.14 n70 20 01.10 w151 4 06.29 3440.72W 368244.78 5972715.57 n70 20 00.69 w151 4 07.90 3620.72W 368062.54 5972583.23 n70 19 59.36 w151 4 13.15 3827.62W 367853.05 5972431.11 n70 19 57,83 w151 4 19.19 3855.89W 367824.43 5972410.32 nT0 19 57.62 w151 4 20.02 4068.64W 367609.03 5972253.91 n70 19 56.04 w151 4 26.22 4091.67W 367585.73 5972238.45 n70 19 55.89 w151 4 26.90 4143.73W 367533.24 5972212.85 n70 19 55.63 w151 4 28.42 4200.37W 367476.32 5972196.72 n70 19 55.46 wlS1 4 30.07 4260.99W 367415.58 5972190.22 n70 19 55.38 w151 4 31.84 4324.92W 367351.71 5972193.42 n70 19 55.41 w151 4 33.71 4391.45W 367285.38 5972206.30 n70 19 55.52 w151 4 35.65 4392.27W 367284.58 5972206.52 n70 19 55.52 w151 4 35.67 4459.87W 367217.34 5972228.71 n70 19 55.73 w151 4 37.65 4526.26W 367151.45 5972258.78 n70 19 56.01 w151 4 39.59 4529.42W 367148.33 5972260.41 nT0 19 56.03 w151 4 39.68 4599.33W 367079.10 5972301.04 n70 19 56.42 w151 4 41.72 4668.84W 367010.41 5972350.16 n70 19 56.89 w151 4 43.75 4687.24W 366992.26 5972364.65 n70 19 57.03 w151 4 44.29 4737.20W 366943.02 5972407.24 n70 19 57.44 w151 4 45.75 4803.65W 366877.66 5972471.65 nT0 19 58.06 w151 4 47.69 4821.86W 366859.77 5972490.96 n70 19 58.25 wlS1 4 48.22 4851.88W 366830.32 5972524.45 n70 19 58.57 wl51 4 49.10 4867.46W 366815.04 5972542.68 n70 19 58.75 w151 4 49.56 4897.53W 366785.59 5972579.65 n70 19 59.10 w151 4 50.43 4927.93W 366755.86 5972619.56 n70 19 59.49 w151 4 51.32 4984.41W 366700.77 5972701.44 n70 20 00.29 w151 4 52.97 5036.26W 366650.36 5972787.43 n70 20 01.12 w151 4 54.49 5056.23W 366631.01 5972823.98 n70 20 01.48 w151 4 55.07 5056.24W 366631.00 5972824.00 nT0 20 01.48 w151 4 55.07 5272.54W 366421.59 5973231.96 n70 20 05.46 w151 5 01.40 5508.35W 366193.28 5973676.75 n70 20 09.79 w151 5 08.30 5744.16W 365964.98 5974121.53 n70 20 14.12 wl51 5 15,20 5979.98W 365736.67 5974566.31 n70 20 18.46 wlS1 5 22,10 6215.79W 365508.36 5975011.09 n70 20 22.79 w151 5 29,00 6451.60W 365280.06 5975455.88 n70 20 27.13 w151 5 35.90 6471.27W 365261.01 5975492.98 n70 20 27.49 w151 5 36,48 6471.28W 365261.00 5975493.00 nT0 20 27.49 w151 5 36.48 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 6536.41 on azimuth 278.10 degrees from wellhead. Total Dogleg for wellpath is 211.78 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.86 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33 HOrizONTAL PRODUCER COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 Version~ll Last revised : 5-Jun-2001 Comments in wellpath ==================== MD TVD Rectangular Coords. Comment 3831.77 3055.44 619.52S 1559.39W KOP - Sidetrack Pt. 5201.27 3815.00 1128.41S 2539.51W EOC 5247.04 3852.00 1144.60S 2561.04W K-3 5519.17 4072.00 1240.89S 2689.03W K-2 7117.32 5364.00 1806.39S 3440.72W Albian-97 7939.90 6029.00 2097.45S 3827.62W Albian-96 8452.31 6443.25 2278.77S 4068.64W Begin Final Bld/Trn 9001.20 6874.00 2331.64S 4392.27W HRZ 9195.49 7005.00 2281.63S 4526.26W K-1 9426.70 7134.00 2178.46S 4687.24W LCU 9628.08 7217.00 2054.40S 4821.86W Miluveach A 9675.14 7232.00 2021.41S 4851.88W Alpine D 9748.97 7252.00 1966.97S 4897.53W Alpine 10041.37 7287.00 1725.26S 5056.23W Target - EOC - CsG Pt 10041.39 7287.00 1725.25S 5056.24W CD2 TGt52 Heel Rvsd 26-0ct-00 130~1.71 7276.00 920.41N 6471.27W TD - CsG Pt. 13041.73 7276.00 920.43N 6471.28W CD2 TGt52 Toe Rvsd 26-Oct-00 Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 4864.94 1587.95S 3150.37W 9 5/8" Casing Targets associated with this wellpath Target nalne Geographic Location T.V.D. Rectangular Coordinates Revised CD2 Tgt52 Heel Rvsd 366631.000,5972824.000,0.0000 7287.00 1725.25S 5056.24W 15-Oct-1997 CD2 TGt52 Toe Rvsd 2 365261.000,5975493.000,2.0000 7276.00 920.43N 6471.28W 15-0ct-1997 CD2-~,.~ Horizontal Producer Ellipse Separation Phillips Alaska, Inc. CD~2 33 slot #33 Alpine Field North Slope, Alaska 3-D MINIMUM DISTANCE CLEARANCE REPORT INCLUDING POSITIONUNCERTAINTIES by Baker Hughes INTEQ Your ref : 33 Version#Il Our ref : Drop4577 License : Date printed : 6-Jun-2001 Date created : 20-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Report is limited to clearances less than 500 feet Proximities will incorporate ellipses - when survey tools are defined for both wells. Ellipse separation in reverse brackets, e.g. )10.2(, where available. DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4* Object wellpath Closest approach with 3-D Minimum Distance method Last revised Distance M.D. Diverging from M.D. PMSS <0-11984'>,,35,CD#2 17-May-2001 )20.0( 200.0 10760.0 MWD <0-9507'>,,42PH,CD#2 27-May-2001 )0.1( 9000.0 9034.1 MWD <8480 - 13138'>,,42,CD#2 31-May-2001 )13.6( 8800.0 9693.8 MWD <0-???'>,,24PH,CD#2 4-Jun-2001 )87.0( 400.0 10300.0 Phillips Alaska, Inc. CD#2,33 Alpine Field,North Slope, Alaska Reference wellpath M.D. T.V.D. Rect Coordinates 0.0 0.0 0.0S 0.0E 100.0 100.0 0.0S 0.0E 200.0 200.0 0.0S 0.0E 300.0 300.0 0.0S 0.0E 400.0 400.0 0.0S 0.0E CLEARANCE LISTING Page 1 Your ref : 33 Version#ii Object wellpath : PMSS <0-11984'>,,35,CD#2 Horiz Min'm Ellipse M.D. T.V.D. Rect Coordinates Bearing Dist Sep'n 0.0 0.0 20.4S 2.6E 172.8 20.6 N/A 100.0 100.0 20.5S 2.6E 172.9 20.7 )20.2( 199.9 199.9 20.9S 2.5E 173.3 21.0 )20.0( 299.9 299.9 21.6S 2.1E 174.3 21.7 )20.1( 399.8 399.8 22.5S 2.1E 174.7 22.5 )20.5( Last revised : 5-Jun-2001 b~ bm~ For: S Re. olds ] Date plotted: 5~u~l ] ~ ~ ~ Pal v~11. I ~ am ~ ~ ~n~ ~ ~ I Phillips Alaska, Inc. Structure: CD#2 Field: Alpine Field Well: 55PB1 Location: North Slope, Alaska Point KOP Build 2/100 Base Permafrost Build 3/100 C-40 C-30 C-20 EOC 9 5/8 Casin9 Pt. K-5 K-2 Albian-97 Albian-96 HRZ K-1 LCU Miluveach A Alpine D Target Alpine Bose Alpine TD PROFIL E COMMENT DATA MD Inc Dir TVD North East V. Sect 500.00 0.00 0.00 500.00 0.00 0.00 0.00 900.00 4.00 248.35 899.68 -5.15 -12.97 15.96 1052.91 6.66 248.35 1052.00 -9.71 -24.44 26.50 2200.00 50.00 248.55 2152.25 -144.28 -563.18 590.79 2289.90 52.70 248.55 2209.00 - 161.55 -406.64 457.55 2536.05 40.08 248.55 2407.00 -215.42 -542.24 585.47 3051.29 55.54 248.35 2752.00 -555.95 -895.96 964.08 5711.77 75.35 248.55 5025.10 -576.65 -1 451.49 1561.84 6500.00 75.55 248.55 5730.14 -1572.66 -3958.50 4259.46 6981.95 75.55 248.33 5852.00 -1 744.81 -4591.83 4725.75 7772.87 75.55 248.55 4052.00 -2027.35 -5105.00 5490.97 14100.41 75.55 248.55 5652.00 -4287.65 -10792.55 11612.87 15919.58 75.55 248.35 6112.00 -4957.49 -12428.04 13572.92 19083.55 75.35 248.33 6912.00 -6067.64 -15272.72 16455.88 20151.12 75.55 248.55 7182.00 -6449.07 -16252.80 17466.95 20546.59 75.55 248.33 7282.00 -6590.54 -1 6588.58 17849.57 20764.10 75.35 248.55 7537.00 -6668.04 -16785.95 18060.01 20803.65 75.55 248.33 7347.00 -6682.1 6 - 1 6819.51 18098.27 20882.72 75.55 248.53 7366.99 -6710.41 -1 6890.61 18174.77 20882.74 75.55 248.55 7567.00 -6710.42 - 1 6890.65 18174.79 21159.80 75.55 248.55 7452.00 -6802.24 -17121.76 18425.50 21416.65 75.55 248.55 7502,00 -6901.15 -17570.67 18691.55 Deg/lO0 0.00 1.00 2.00 2.00 5.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 900 ,510 500 290 28O 270 2 26O 25O 240 250 Strudure : CD#2 520 TRUE NORTH EZZ] 350 0 10 540 20 210 50 4O 5O 220 150 14O 210 150 200 ~0 160 1 180 170 Normal Plane Travelling Cylinder - Feet All depths shown are Measured depths on Reference Well 60 70 80 0 90 !00 110 120 :~Phillips Alaska, Inc. Sfrucfure : CD#2 Well : $3PB1 I F~eld : Alpine Field Locoflon : North Slope, AIosko 360 340 ,320 500 280 260 <- West (feet) 240 220 200 180 160 140 120 100 80 60 I 410 20 0 20 40 60 80 1900 Phillips Alaska, Inco Structure : CD#2 We~I : 33PB1 I Field : Alpine Field Location : North Slope, Aiosko) <- West (feet) 2400 2300 2200 21 OD 2000 1900 ~ 800 1700 1600 ~ 500 1400 1300 ~ 200 11 O0 ~ 009 900800 700 600 500 400 300 200 ~ 5%a , -' ' ' , ' ' . 6300 . -. - '~4sdo , , ./:~c ./- - t ~4od 54O0 ,.,5~00 700 8OO Vi 900 1000 1100 1200 1300 Strucfure: CD#2 Well <- Wesf (feel) 3900 38?0 37~00 3600 3500 3400 33100 3200 31~00 3000 2900 2800 27?0 2600 2500 2400 23100 2200 21~00 2000 1900 1870 1700 7274 . . - - 600~ ¢ ~000-,~800 6609- - ' 4200' '* ~400 ',,7200 '''''' ~ .700068008~0~0~ ,,-3too 5200_- ~4oo'5b°° . 3800~ ~0 ~600 ~ 5~00 Phillips Alaska, Inc. <- West (feet) 74~00 72~00 7000 6500 6600 6~00 6200 5000 5600 5660 5400 5200 8000 4800 4600 4400 420O 40O0 5800 560O 5400 5200 3000 5600 b 7287 ', 40qO- ~ ' 68~0 i3200 5400 Phillips Alaska, Inc. Structure : CD#2 Welt : 33PB1 i Field: Alpine Field Location : Norfh Slope, Alaska <- Wesf (feel) 18000 17400 16800 16200 156OO 15000 1440O 15800 15200 12800 12000 ~1400 10800 10200 9600 9000 8400 7800 7200 6600 8000 54O0 4800 % 6600 640o· - -6000 5600 5800 - ~,,, &oo - -5000 4200 - ' ' ~600 720~ ' -, 4600 - *~200 6800 7200 78OO 84O0 CD2-33PB 1 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB1 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB1 Version#ii Our ref : prop3683 License : Date printed : 5-Jun-2001 Date created : 22~Oct-1999 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33PB 1 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB1 Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C O O R D I N A T E S 0.00 0.00 0.00 0.00 0.00 S 0,00 E 500.00 0.00 0.00 500.00 0.00 N 0.00 E 600.00 1.00 248.34 599.99 0.32 S 0.81 W 700.00 2.00 248.33 699.96 1.29 S 3.24 W 800.00 3.00 248.33 799.86 2.90 S 7.30 W 900.00 4.00 248.33 899.68 5.15 S 12.97 W 1000.00 6.00 248.33 999.29 8.37 S 21.07 W 1032.91 6.66 248.33 1032.00 9.71 S 24.44 W 1100.00 8.00 248.33 1098.54 12.87 S 32,40 W 1200.00 10.00 248.33 1197.31 18.64 S 46.93 W 1300.00 12.00 248.33 1295.46 25.69 S 64,66 W 1400.00 14.00 248.33 1392.89 33.99 S 85.57 W 1500.00 16.00 248.33 1489.48 43.55 S 109,62 W 1600.00 18.00 248.33 1585.11 54.34 S 136.79 W 1700.00 20.00 248.33 1679.66 66.36 S 167,05 W 1800.00 22.00 248.33 1773.01 79.59 S 200.35 W 1900.00 24.00 248.33 1865.05 94.02 S 236,66 W 2000.00 26.00 248.33 1955.68 109.62 S 275,93 W 2100.00 28.00 248.33 2044.78 126.38 S 318.12 W 2200.00 30.00 248.33 2132.23 144.28 S 363,18 W 2289.90 32.70 248.33 2209.00 161.55 S 406,64 W 2300.00 33.00 248.33 2217.49 163.57 S 411.73 W 2400.00 36.00 248.33 2299.89 184.48 S 464,36 W 2500.00 39.00 248.33 2379.22 206.96 S 520,93 W 2536.03 40.08 248.33 2407.00 215.42 S 542,24 W 2600.00 42.00 248.33 2455.25 230.93S 581,28W 2700.00 45.00 248.33 2527.78 256.34S 645,24W 2800.00 48.00 248.33 2596.61 283.12S 712.65W 2900.00 51.00 248.33 2661.54 311.19S 783.31W 3000.00 54.00 248.33 2722.41 340.48S 857,03W 3051.29 55.54 248.33 2752.00 355.95S 895.96 W 3100.00 57.00 248.33 2779.05 370.91S 933.61 W 3200.00 60.00 248.33 2831.29 402.38S 1012.84W 3300.00 63.00 248.33 2879.00 434.83S 1094.50W 3400.00 66.00 248.33 2922.05 468.15S 1178,38W 3500.00 69.00 248.33 2960.31 502.26S 1264,23W 3600.00 72.00 248.33 2993.69 537.06S 1351.82W 3700.00 75.00 248.33 3022.09 572.45S 1440,92W 3711.77 75.35 248.33 3025.10 576.65S 1451.49W 4000.00 75.35 248.33 3097.98 679.62S 1710.65W 4500.00 75.35 248.33 3224.41 858.22 S 2160,22W 5000.00 75.35 248.33 3350.84 1036.83S 2609.79W 5500.00 75.35 248.33 3477.27 1215.44S 3059,36W 6000.00 75.35 248.33 3603.71 1394.05S 3508,93W 6500.00 75.35 248.33 3730.14 1572.66S 3958.50W 6981.93 75.35 248.33 3852.00 1744.81S 4391.83W 7000.00 75.35 248.33 3856.57 1751.27S 4408,07W 7500.00 75.35 248.33 3983.00 1929.88S 4857.65W 7772.87 75.35 248.33 4052.00 2027.35S 5103.00W 8000.00 75.35 248.33 4109.43 2108.48S 5307.22W PROPOSAL LISTING Page 1 Your ref : 33 PB1 Version~ll Last revised : 5-Jun-2001 Dogleg Vert Deg/100ft Sect 0.00 0.00 0.00 0.00 KOP 1.00 0.87 1.00 3.49 1.00 7.85 1.00 2.00 2.00 2.00 2.00 13.96 Build 2/100 22.67 26.30 Base Permafrost 34.86 50.50 2 00 69.58 2 00 92.07 2 00 117.96 2 00 147.19 2 00 179.75 00 215.58 00 254.65 00 296.91 00 342.31 00 390.79 Build 3/100 3.00 437.55 C-40 3.00 443.03 3.00 499.67 3.00 560.53 3.00 583.47 C-30 3.00 625.47 3.00 694.30 3.00 766.83 3.00 842.86 3.00 922.19 3.00 964.08 C-20 3.00 1004.59 3.00 1089.84 3.00 1177.72 3.00 1267.96 3.00 1360.34 3.00 1454.59 3.00 1550.47 3.00 1561.84EOC 0.00 1840.71 0.00 2324.46 0.00 2808.21 0.00 3291.96 0.00 3775.71 0.00 4259.46 9 5/8" Casing Pt. 0.00 4725.73 0.00 4743.21 0.00 5226.96 0.00 5490.97K-2 0.00 5710.71 Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52,00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33PB 1 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB1 Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C O O R D I N A T E S 8500.00 75.35 248.33 4235.86 2287.09 S 5756.79 W 9000.00 75.35 248.33 4362.30 2465.70 $ 6206.36 W 9500.00 75.35 248.33 4488,73 2644.31 S 6655.93 W 10000.00 75.35 248.33 4615.16 2822.92 S 7105.50 W 10500.00 75.35 248.33 4741.59 3001.53 S 7555.07 W 11000.00 75.35 248.33 4868.02 3180.13 S 8004.64 W 11500.00 75.35 248.33 4994.45 3358.74 S 8454.21 W 12000.00 75.35 248.33 5120,88 3537.35 S 8903.78 W 12500.00 75.35 248.33 5247,32 3715.96 S 9353.36 W 13000.00 75.35 248.33 5373,75 3894.57 S 9802.93 W 13500.00 75.35 248.33 5500,18 4073.18 S 10252.50 W 14000.00 75.35 248.33 5626,61 4251.79S 10702.07W 14100.41 75.35 248.33 5652,00 4287.65S 10792.35W 14500.00 75.35 248.33 5753,04 4430.39S 11151.64W 15000.00 75.35 248.33 5879,47 4609.00S 11601.21W 15500.00 75.35 248.33 6005,90 4787.61$ 12050.78 W 15919.58 75.35 248.33 6112.00 4937.49S 12428.04W 16000.00 75.35 248.33 6132.34 4966.22S 12500.35W 16500.00 75.35 248.33 6258.77 5144.83S 12949.92W 17000.00 75.35 248.33 6385.20 5323.44S 13399.49W 17500.00 75.35 248.33 6511.63 5502.05$ 13849.07 W 18000.00 75.35 248.33 6638.06 5680.65S 14298.64W 18500.00 75.35 248.33 6764,49 5859.26S 14748.21W 19000.00 75.35 248.33 6890.92 6037.87S 15197.78W 19083.35 75.35 248.33 6912.00 6067.64S 15272.72W 19500.00 75.35 248.33 7017.36 6216.48S 15647.35W 20000.00 75.35 248.33 7143.79 6395.09S 16096.92W 20151.12 75.35 248.33 7182.00 6449.07S 16232.80W 20500.00 75.35 248.33 7270.22 6573.70S 16546.49W 20546.59 75.35 248.33 7282.00 6590.34S 16588.38W 20764.10 75.35 248.33 7337,00 6668.04S 16783.95W 20803.65 75.35 248.33 7347.00 6682.16S 16819.51W 20882.72 75.35 248.33 7366.99 6710.41S 16890.61W 20882.74 75.35 248.33 7367.00 6710.42S 16890.63W 21000.00 75.35 248.33 7396.65 6752.31S 16996.06W 21139.80 75.35 248.33 7432.00 6802.24S 17121.76W 21416.63 75.35 248.33 7502.00 6901.13S 17370.67W PROPOSAL LISTING Page 2 Your ref : 33 PB1 Version~ll Last revised : 5-Jun-2001 Dogleg Deg/100ft 0.00 0.00 0.00 0.00 0.00 Vert Sect 6194.46 6678.22 7161.97 7645.72 8129.47 0.00 8613.22 0.00 9096.97 0.00 9580.72 0.00 10064.47 0.00 10548.22 0.00 11031.98 0.00 11515.73 0.00 11612.87 Albian-97 0.00 11999.48 0.00 12483.23 0.00 12966.98 0.00 13372.92 Alblan-96 0.00 13450.73 0.00 13934.48 0.00 14418.23 0.00 14901.98 0.00 15385.73 0,00 15869.49 0.00 16353.24 0.00 16433.88 HRZ 0.00 16836.99 0.00 17320.74 0.00 17466.95 K-1 0.00 17804.49 0.00 17849.57 LCU 0.00 18060.01 Miluveach A 0.00 18098.27 Alpine D 0.00 18174.77 Target 0.00 18174.79 AlpWst 2ndryTgt Rvsd 15-Mar-01 0.00 18288.24 0.00 18423.50 Base Alpine 0.00 18691.33 TD All data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33PB 1 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB1 A1Dine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB1 Version#Ii Last revised : 5-Jun-2001 Comments in wellpath ==================== MD TVD Rectangular Coords. Comment 500 00 500.00 0 00 N 0.00 E KOP 900 1032 2200 2289 2536 3051 3711 6500 6981 7772 14100 15919 19083 20151 20546 20764 20803 20882 20882 21139 21416 00 899. 91 1032. 00 2132. 90 2209. 03 2407. 29 2752. 77 3025. 00 3730 93 3852 87 4052 41 5652 58 6112 35 6912 12 7182 59 7282 10 7337 65 7347 72 7366 74 7367 80 7432 63 7502 68 5 00 9 23 144 00 161 00 215 00 355 10 576 14 1572 00 1744 00 2027 00 4287 00 4937 00 6067 00 6449 00 6590 00 6668 00 6682 99 6710 00 6710 00 6802 00 6901 15 S 12.97 W Build 2/100 71 S 24.44 W Base Permafrost 28 S 363.18 W Build 3/100 55 S 406.64 W C-40 42 S 542.24 W C-30 95 S 895.96 W C-20 65 S 1451.49 W EOC 66 S 3958.50 W 9 5/8" Casing Pt. 81 S 4391.83 W K-3 35 S 5103.00 W K-2 65 S 10792.35 W Albian-97 49 S 12428.04 W Albian-96 64 S 15272.72 W HRZ 07 S 16232.80 W 34 S 16588.38W LCU 04 S 16783.95W Miluveach A 16 S 16819.51W Alpine D 41 S 16890.61W Target 42 S 16890.63W AlpWst 2ndryTgt Rvsd 15-Mar-01 24 S 17121.76W Base Alpine 13 S 17370.67W TD Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.14 1572.66S 3958.50W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised AlpWst 2ndryTgt Rvsd 354715.000,5968040.000,0.0000 7367.00 6710.42S 16890.63W 15-Mar-2001 CD2-33PB 1 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB1 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB1 Version#Ii Our ref : prop3683 License : Date printed : 5-Jun-2001 Date created : 22-0ct-1999 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33PB 1 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB1 Alpine Field,North SloDe, Alaska Measured Inclin Azimuth True Vert DeDth Degrees Degrees DeDth ~ 0.00 0.00 0.00 0.00 500.00 0.00 0.00 500.00 600.00 1.00 248.34 599.99 700.00 2.00 248.33 699.96 800.00 3.00 248.33 799.86 900.00 4.00 248.33 899.68 1000.00 6.00 248.33 999.29 1032.91 6.66 248.33 1032.00 1100.00 8.00 248.33 1098.54 1200.00 10.00 248.33 1197.31 1300.00 12.00 248.33 1295.46 1400.00 14.00 248.33 1392.89 1500.00 16.00 248.33 1489.48 1600.00 18.00 248.33 1585.11 1700.00 20.00 248.33 1679.66 1800.00 22.00 248.33 1773.01 1900.00 24.00 248.33 1865.05 2000.00 26.00 248.33 1955.68 2100.00 28.00 248.33 2044.78 2200.00 30.00 248.33 2132.23 2289.90 32.70 248.33 2209.00 2300.00 33.00 248.33 2217.49 2400.00 36.00 248.33 2299.89 2500.00 39.00 248.33 2379.22 2536.03 40.08 248.33 2407.00 2600.00 42.00 248.33 2455.25 2700.00 45.00 248.33 2527.78 2800.00 48.00 248.33 2596.61 2900.00 51.00 248.33 2661.54 3000.00 54.00 248.33 2722.41 3051.29 55.54 248.33 2752 00 3100.00 57.00 248.33 2779 05 3200.00 60.00 248.33 2831 29 3300.00 63.00 248.33 2879 00 3400.00 66.00 248.33 2922 05 3500.00 69.00 248.33 296031 3600.00 72.00 248.33 299369 3700.00 75.00 248.33 302209 3711.77 75.35 248.33 302510 4000.00 75.35 248.33 309798 4500.00 75.35 248.33 3224.41 5000.00 75.35 248.33 3350.84 5500.00 75.35 248.33 3477.27 6000.00 75.35 248.33 3603.71 6500.00 75.35 248.33 3730.14 6981.93 75.35 248.33 3852.00 7000.00 75.35 248.33 3856.57 7500.00 75.35 248.33 3983.00 7772.87 75.35 248.33 4052.00 8000.00 75.35 248.33 4109.43 PROPOSAL LISTING Page 1 Your ref : 33 PB! Version~ll Last revised : 5-Jun-2001 RECTANGULAR GRID COORDS GEOGRAPHIC COORDINATES Easting Northing COORDINATES 0.00S 0.00N 0.32S 1,29S 2.90S 0.00E 371715 27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715 27 5974463.39 n70 20 18.48 w151 2 27.44 0.81W 371714 45 5974463.08 n70 20 18.47 w151 2 27.46 3.24W 371712 01 5974462.15 n70 20 18.46 w151 2 27.53 7.30W 371707 93 5974460.61 n70 20 18.45 w151 2 27.65 5.15S 8.37S 9.71S 12.87S 18.64S 12.97W 371702 22 5974458.45 n70 20 18.42 w151 2 27.82 21.07W 371694 06 5974455.37 n70 20 18.39 w151 2 28.05 24.44W 371690 67 5974454.09 n70 20 18.38 w151 2 28.15 32.40W 371682 67 5974451.07 n70 20 18.35 w151 2 28.38 46.93W 371668 03 5974445.54 n70 20 18.29 w151 2 28.81 25.69S 33.99S 43.55S 54.34S 66.36S 64.66W 371650.19 5974438.79 n70 20 18.22 w151 2 29.33 85.57W 371629.15 5974430.84 n70 20 18.14 w151 2 29.94 109.62W 371604.94 5974421.70 n70 20 18.05 w151 2 30.64 136.79W 371577.59 5974411.37 n70 20 17.94 w151 2 31.43 167.05W 371547.14 5974399.86 n70 20 17.82 w151 2 32.32 79.59S 94.02S 109.62S 126.38S 144.28S 200.35W 371513.62 5974387.20 n70 20 17.69 wlS1 2 33.29 236.66W 371477.07 5974373.39 n70 20 17.55 w151 2 34.35 275.93W 371437.55 5974358.45 n70 20 17.40 w151 2 35.50 318.12W 371395.08 5974342.41 n70 20 17.23 w151 2 36.73 363.18W 371349.74 5974325.27 n70 20 17.06 w151 2 38.04 161.55S 163.57S 184.48S 206.96S 215.42S 406.64W 371306.00 5974308.75 n70 20 16.89 w151 2 39.31 411.73W 371300.87 5974306.81 n70 20 16.87 w151 2 39.46 464.36W 371247.90 5974286.79 n70 20 16.66 w151 2 41.00 520.93W 371190.96 5974265.28 n70 20 16.44 w151 2 42.65 542.24W 371169.51 5974257.18 n70 20 16.36 w151 2 43.27 230.93S 256.34S 283.12S 311.19S 340.48S 581.28W 371130.22 5974242.33 n70 20 16.20 w151 2 44.41 645.24W 371065.84 5974218.01 n70 20 15.95 w151 2 46.28 712.65W 370998.00 5974192.37 n70 20 15.69 w151 2 48.25 783.31W 370926.88 5974165.50 n70 20 15.41 w151 2 50.31 857.03W 370852.68 5974137.47 n70 20 15.12 w151 2 52.47 355.95S 370.91S 402.38S 434.83S 468.15S 895.96W 370813.49 5974122.66 n70 20 14.97 wlS1 2 53.60 933.61W 370775.60 5974108.34 n70 20 14.82 w151 2 54.70 1012.84W 370695.86 5974078.21 n70 20 14.51 w151 2 57.02 1094.50W 370613.66 5974047.16 n70 20 14.20 w151 2 59.40 1178.38W 370529.25 5974015.26 n70 20 13.87 w151 3 01.85 502.26S 537.06S 572.45S 576.65S 679.62S 1264.23W 370442,84 5973982.61 n70 20 13.53 w151 3 04.36 1351.82W 370354.68 5973949.30 n70 20 13.19 wlS1 3 06.92 1440.92W 370265.00 5973915.42 n70 20 12.84 w151 3 09.52 1451.49W 370254.36 5973911.40 n70 20 12.80 w151 3 09.83 1710.65W 369993.52 5973812.84 n70 20 11.79 w151 3 17.39 858.22S 1036.83S 1215.44S 1394.05S 1572.66S 2160.22W 369541.03 5973641.87 n70 20 10.03 w151 3 30.52 2609.79W 369088.54 5973470.90 n70 20 08.27 w151 3 43.65 3059.36W 368636.05 5973299.93 n70 20 06.51 w151 3 56.77 3508.93W 368183.56 5973128.97 n70 20 04.75 w151 4 09.90 3958.50W 367731.07 5972958.00 n70 20 02.99 w151 4 23.02 1744.81S 1751.27S 1929.88S 2027.35S 2108.48S 4391.83W 367294.94 5972793.21 n70 20 01.29 w151 4 35.67 4408.07W 367278.58 5972787.03 n70 20 01.23 w151 4 36.15 4857.65W 366826.09 5972616.06 n70 19 59.47 w151 4 49.27 5103.00W 366579.15 5972522.75 n70 19 58.51 w151 4 56.43 5307.22W 366373.60 5972445.09 n70 19 57.71 w151 5 02.39 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 sDheroid Presented by Baker Hughes INTEQ .. CD2-33PB 1 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB1 Alpine Field,North Slope, Alaska Measured Inclin Azimuth True Vert Depth Degrees Degrees Depth 8500.00 75.35 248.33 4235.86 9000.00 75.35 248.33 4362.30 9500.00 75.35 248.33 4488.73 10000.00 75.35 248.33 4615.16 10500.00 75.35 248.33 4741.59 11000.00 75.35 248.33 4868.02 11500.00 75.35 248.33 4994.45 12000.00 75.35 248.33 5120.88 12500.00 75.35 248.33 5247.32 13000.00 75.35 248.33 5373.75 13500.00 75.35 248.33 5500.18 14000.00 75.35 248.33 5626.61 14100.41 75.35 248.33 5652.00 14500.00 75.35 248.33 5753.04 15000.00 75.35 248.33 5879.47 15500.00 75.35 248.33 6005.90 15919.58 75.35 248.33 6112.00 16000.00 75.35 248.33 6132.34 16500.00 75.35 248.33 6258.77 17000.00 75.35 248.33 6385.20 17500.00 75.35 248 18000.00 75.35 248 18500.00 75.35 248 19000.00 75.35 248 19083.35 75.35 248 33 6511.63 33 6638.06 33 6764.49 33 6890.92 33 6912.00 19500.00 75.35 248 20000.00 75.35 248 20151.12 75.35 248 20500.00 75.35 248 20546.59 75.35 248 33 7017.36 33 7143.79 33 7182.00 33 7270.22 33 7282.00 20764.10 75.35 248 20803.65 75.35 248 20882.72 75.35 248 20882.74 75.35 248 21000.00 75.35 248 33 7337.00 33 7347.00 33 7366.99 33 7367.00 33 7396.65 21139.80 75.35 21416.63 75.35 248.33 7432.00 248.33 7502.00 RECTANGULAR COORDINATES 2287 . 09S 5756 . 79W 2465 . 70S 6206.36W 2644 . 31S 6655 . 93W 2822 . 92S 7105 . 50W 3001.53S 7555.07W 3180 . 13S 8004 . 64W 3358.74S 8454.21W 3537 . 35S 8903 . 78W 3715 . 96S 9353 . 36W 3894 . 57S 9802 . 93W 4073 . 18S 10252 . 50W 4251 . 79S 10702 . 07W 4287 . 65S 10792 . 35W 4430 . 39S 11151.64W 4609 . 00S 11601.21W 4787 . 61S 12050 . 78W 4937 . 49S 12428.04W 4966 . 22S 12500 . 35W 5144 . 83S 12949 . 92W 5323.44S 13399.49W 5502 . 05S 13849 . 07W 5680 . 65S 14298 . 64W 5859 . 26S 14748 . 21W 6037 . 87S 15197 . 78W 6067 . 64S 15272 . 72W 6216 . 48S 15647 . 35W 6395 . 09S 16096.92W 6449 . 07S 16232 . 80W 6573 . 70S 16546 . 49W 6590 . 34S 16588.38W 6668 . 04S 16783 . 95W 6682 . 16S 16819 . 51W 6710 . 41S 16890 . 61W 6710 . 42S 16890 . 63W 6752.31S 16996.06W 6802.24S 17121.76W 6901.13S 17370.67W PROPOSAL LISTING Page 2 Your ref : 33 PB1 Version~ll Last revised : 5-Jun-2001 GRID C O O R D S GEOGRAPHIC Easting Northing C O O R D I N A T E S 365921 365468 365016 364563 364111 11 5972274.12 n70 19 55.95 w151 5 15.52 63 5972103.15 n70 19 54.19 w151 5 28.64 14 5971932.18 n70 19 52.43 w151 5 41.76 65 5971761.22 n70 19 50.66 w151 5 54.88 16 5971590.25 n70 19 48.90 w151 6 08.00 363658 363206 362753 362301 361848 67 5971419.28 n70 19 47.14 w151 6 21.12 18 5971248.31 n70 19 45.38 w151 6 34.24 69 5971077.34 n70 19 43.62 w151 6 47.35 20 5970906.37 n70 19 41.85 w151 7 00.47 71 5970735.40 n70 19 40.09 w151 7 13.59 361396.22 5970564.44 n70 19 38.33 w151 7 26.70 360943.73 5970393.47 n70 19 36.56 w151 7 39.82 360852.86 5970359.13 n70 19 36.21 w151 7 42.45 360491.24 5970222.50 n70 19 34.80 w151 7 52.93 360038.75 5970051.53 n70 19 33.03 w151 8 06.05 359586.27 5969880.56 n70 19 31.27 w151 8 19.16 359206.56 5969737.09 n70 19 29.79 w151 8 30.16 359133.78 5969709.59 n70 19 29.51 w151 8 32.27 358681.29 5969538.62 n70 19 27.74 w151 8 45.38 358228.80 5969367.65 n70 19 25.98 w151 8 58.50 357776.31 5969196.69 n70 19 24 357323.82 5969025.72 n70 19 22 356871.33 5968854.75 n70 19 20 356418.84 5968683.78 n70 19 18 356343.41 5968655.28 n70 19 18 .21 w151 9 11.61 .44 w151 9 24.72 .68 w151 9 37.83 .91 w151 9 50.94 .62 w151 9 53.12 355966.35 5968512.81 n70 19 17.15 w151 10 04.04 355513.86 5968341.84 n70 19 15.38 w151 10 17.15 355377.10 5968290.17 n70 19 14.84 w151 10 21.11 355061.37 5968170.87 n70 19 13.61 w151 10 30.26 355019.21 5968154.94 n70 19 13.45 w151 10 31.48 354822.37 5968080.57 n70 19 12 354786.58 5968067.05 n70 19 12 354715.02 5968040.01 n70 19 12 354715.00 5968040.00 n70 19 12 354608.88 5967999.90 n70 19 11 .68 wlS1 10 37.18 .54 w151 10 38.22 .26 w151 10 40.29 .26 w151 10 40.29 .84 w151 10 43.37 354482.37 5967952.10 n70 19 11 354231.84 5967857.44 n70 19 10 .35 w151 10 47.03 .37 w151 10 54.29 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33PB 1 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB1 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB1 Version~ll Last revised : 5-Jun-2001 Comments in wellpath ==================== MD TVD Rectangular Coords. Corr~nent 500 00 500.00 0.00N 0 00E KOP 900 1032 2200 2289 2536 3051 3711 6500 6981 7772 14100 15919 19083 20151 20546 20764 20803 20882 20882 21139 21416 00 899 91 1032 00 2132 90 2209 03 2407 29 2752 .77 3025 00 3730 93 3852 87 4052 41 5652 58 6112 35 6912 12 7182 59 7282 10 7337 65 7347 .72 7366 .74 7367 .80 7432 .63 7502 .68 5.15S 12 .00 9.71S 24 .23 144.28S 363 00 161.55S 406 00 215.42S 542 00 355.95S 895 10 576.65S 1451 14 1572.66S 3958 00 1744.81S 4391 00 2027.35S 5103 00 4287.65S 10792 00 4937.49S 12428 00 6067.64S 15272 00 6449.07S 16232 00 6590.34S 16588 00 6668.04S 16783 00 6682.16S 16819 99 6710.41S 16890 .00 6710.42S 16890 .00 6802.24S 17121 .00 6901.13S 17370 97W Build 2/100 44W Base Permafrost 18W Build 3/100 64W C-40 24W C-30 96W C-20 49W EOC 50W 9 5/8" Casing Pt. 83W K-3 00W K-2 35W Albian-97 04W Albian-96 72W HRZ 80W K-1 38W LCU 95W Miluveach A 51W Alpine D 61W Target 63W AlpWst 2ndryTgt Rvsd 15-Mar-01 76W Base Alpine 67W TD Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0,00S 0.00E 6500.00 3730.14 1572.66S 3958.50W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised AlpWst 2ndryTgt Rvsd 354715.000,5968040.000,0.0000 7367.00 6710.42S 16890.63W 15-Mar-2001 Phillips Alaska, fnc.~ j Field : Alpine Field Loco}ion : Nodh Slope, Alaska 248.33 AZIMUTH 4O00 '~400 4800 5200 5600 60O0 8400 6800 7200 7800 8000 8400 8808 9200 9600 10800 10400 10800 11200 11600 12000 124~00 12800 13200 Vertical Sec'[ion (feel) -> Azimufh 248,33 wifh reference 0,00 S, 0.00 E from slof #33 Phillips Alaska, Inc. Structure: CD#2 Well : 33PB2 Field: Alpine Field Location: Norlh Slope, Alaska Point KOP - Sidetrack Pt. K-2 EOC Albian-97 Albian-96 HRZ K-1 LCU Miluveach A Alpine D Target - Alpine Base Alpine TD PROFILE COMMENT MD Inc Dir TVD 7000.00 75.35 248.53 3856.59 7659.09 66.78 229.46 4072.00 7983.59 63.40 219.39 4208.94 10563.61 65.40 219.59 5564.00 12049.00 63.40 219.39 6029.00 15994.55 65.40 219.59 6900.00 1 4289.38 65.40 219.59 7052.00 14651.15 65.40 219.59 7185.00 14874.60 65.40 219.59 7294.00 14899.17 63.40 219.59 7505.00 1 4975.12 65.40 219.39 7359.00 15129.24 65.40 219.59 7408.00 15339.20 63.40 219.39 7502.00 DATA North -1751.25 -2068.95 -2278.49 -4061 -5087.92 -6452.40 -6656.15 -6872.52 -7040.57 -7057.55 -7110.05 -721 6.54 -7561.64 East -4408.08 -4939.84 -51 45.72 -6609.78 -7452.68 -8556.69 -8724.00 -8917.93 -9056.09 -9070.03 -9113.15 -9200.59 -9519.73 V. Sect Deg/lO0 4745.21 0.00 5354.70 3.00 5623.41 3.00 7642.56 0.00 8804.74 0.00 10527.18 0.00 10557.91 0.00 10825.54 0.00 11015.86 0.00 11055.09 0.00 11094.52 0.00 11215.15 0.00 11579.45 0.001 310 300 290 280 270 2' 260 TRUE NORTH [ZEE] 550 0 340 "'-~ 1800 '"5.5 O 210 320 . 10 20 $0 4-0 250 240 250 220 140 210 /, 150 200 ~ ~6~oo ~ 60 , 180 170 Normal Plane Travelling Cylinder - ~eet All depths shown are Measured depths on Reference Well 5O 6O 70 8O 0 90 1 O0 110 120 130 CD2-33PB2 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB2 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker HuGhes INTEQ Your ref : 33 PB2 Version#ii Our ref : prop4551 License : Date printed : 5-Jun-2001 Date created : 15-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33PB2 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert DeDth Degrees Degrees Depth 0.00 0.00 0.00 100.00 0.00 248.33 200.00 0.00 248.33 300.00 0.00 248.33 400.00 0.00 248.33 500.00 0.00 248.33 600.00 1.00 248.33 700.00 2.00 248.33 800.00 3.00 248.33 900.00 4.00 248.33 1000.00 6.00 248.33 1100.00 8.00 248.33 1200.00 10.00 248.33 1300.00 12.00 248.33 1400.00 14.00 248.33 1500.00 16.00 248.33 1600.00 18.00 248.33 1700.00 20.00 248.33 1800.00 22.00 248.33 1900.00 24.00 248.33 2000.00 26.00 248.33 2100.00 28.00 248.33 2200.00 30.00 248.33 2299.99 33.00 248.33 2399.99 36.00 248.33 2499.99 39.00 248.33 2599.99 42.00 248.33 2699.99 45.00 248.33 2799.99 48.00 248.33 2899.99 51.00 248.33 2999.99 54.00 248.33 3099.99 57.00 248.33 3199.99 60.00 248.33 3299.99 63.00 248.33 3399.99 66.00 248.33 3499.99 69.00 248.33 3599.99 72.00 248.33 3699.99 75.00 248.33 3711.77 75.35 248.33 4000.00 75.35 248.33 4500.00 75.35 248.33 5000.00 75.35 248.33 5500.00 75.35 248.33 6000.00 75.35 248.33 6500.00 75.35 248.33 7000.00 75.35 248.33 7100.00 73.94 245.59 7200.00 72.56 242.81 7300.00 71.21 239.99 7400.00 69.91 237.12 PROPOSAL LISTING Page 1 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 R E C T A N G U L A R Dogleg Vert C O O R D I N A T E S Deg/100ft Sect 0.00 0.00 S 0.00 E 0.00 0.00 100.00 0.00 S 0.00 E 0.00 0.00 200.00 0.00 S 0.00 E 0.00 0.00 300.00 0.00 S 0.00 E 0.00 0.00 400.00 0.00 S 0.00 E 0.00 0.00 500.00 0.00 S 0.00 E 0.00 0.00 599.99 0.32 S 0.81 W 1.00 0.87 699.96 1.29 S 3.24 W 1.00 3.49 799.86 2.90 S 7.30 W 1.00 7.85 899.68 5.15 S 12.97 W 1.00 13.96 999.29 8.37 S 21.07 W 2.00 22.67 1098.54 12.87 S 32.40 W 2.00 34.86 1197.30 18.65 S 46.93 W 2.00 50.50 1295.46 25.69 S 64.66 W 2.00 69.58 1392.89 34.00 S 85.57 W 2.00 92.07 1489.48 43.55 S 109.62 W 2.00 117.96 1585.11 54.34 S 136.79 W 2.00 147.19 1679.65 66.36 S 167.05 W 2.00 179.75 1773.01 79.60 S 200.35 W 2.00 215.58 1865.05 94.02 S 236.66 W 2.00 254.65 1955.68 109.62 S 275.93 W 2.00 296.91 2044.77 126.38 S 318.12 W 2.00 342.31 2132.23 144.28 S 363.18 W 2.00 390.79 2217.48 163.57 S 411.73 W 3.00 443.03 2299.88 184.48 S 464.36 W 3.00 499.66 2379.21 206.95 S 520.93 W 3.00 560.53 2455.24 230.93 S 581.27 W 3.00 625.47 2527.77 256.34 S 645.24 W 3.00 694.29 2596.60 283.12 S 712.64 W 3.00 766.82 2661.54 311.19 S 783.30 W 3.00 842.85 2722.41 340.48 S 857.02 W 3.00 922.18 2779.04 370.90 S 933.60 W 3.00 1004.58 2831.29 402.38 S 1012.83 W 3.00 1089.84 2879.00 434.82 S 1094.50 W 3.00 1177.71 2922.04 468.14 S 1178.37 W 3.00 1267.96 2960.31 502.25 S 1264.22 W 3.00 1360.33 2993.69 537.05 S 1351.81 W 3.00 1454.59 3022.09 572.45 S 1440.91 W 3.00 1550.46 3025.10 576.65 S 1451.49 W 3.00 1561.84 3097.98 679.61 S 1710.65 W 0.00 1840.70 3224.42 858.22 S 2160.22 W 0.00 2324.46 3350.85 1036.82 S 2609.79 W 0.00 2808.21 3477.29 1215.43 S 3059.36 W 0.00 3291.96 3603.72 1394.03 S 3508.94 W 0.00 3775.71 3730.15 1572.64 S 3958.51 W 0.00 4259.46 3856.59 1751.25 S 4408.08 W 0.00 4743.21 KOP - Sidetrack Pt. 3883.07 1788.97 S 4496.81 W 3.00 4839.60 3911.90 1830.64 S 4583.01 W 3.00 4935.09 3943.00 1876.12 S 4666.45 W 3.00 5029.43 3976.28 1925.30 S 4746.89 W 3.00 5122.35 Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Calculation uses the minimum curvature method, Presented by Baker Hughes INTEQ CD2-33PB2 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33PB2 Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth 7500.00 68.66 234.20 4011.66 7600.00 67.46 231.24 4049.02 7659.09 66.78 229.46 4072.00 7700.00 66.32 228.22 4088.28 7800.00 65.23 225.16 4129.33 7900.00 64.21 222.04 4172.04 7983.59 63.40 219.39 4208.94 8000.00 63.40 219.39 4216.29 8500.00 63.40 219.39 4440.14 9000.00 63.40 219.39 4663.98 9500.00 63.40 219.39 4887.83 10000.00 63.40 219.39 5111.68 10500.00 63.40 219.39 5335.52 10563.61 63.40 219.39 5364.00 11000.00 63.40 219.39 5559.37 11500.00 63.40 219.39 5783.22 12000.00 63.40 219.39 6007.06 12049.00 63.40 219.39 6029.00 12500.00 63.40 219.39 6230.91 13000.00 63.40 219.39 6454.75 13500.00 63.40 219.39 6678.60 13994.53 63.40 219.39 6900.00 14000.00 63.40 219.39 6902.45 14289.38 63.40 219.39 7032.00 14500.00 63.40 219.39 7126.29 63.40 219.39 718500 63.40 219.39 729400 63.40 219.39 730500 63.40 219.39 733900 63.40 219.39 735014 63.40 219.39 740800 63.40 219.39 750200 14631.13 14874.60 14899.17 14975.12 15000.00 15129.24 15339.20 PROPOSAL LISTING Page 2 Your ref : 33 PB2 Version#il Last revised : 5-Jun-2001 R E C T A N G U L A R Dogleg Vert C 00 R D I N A T E S Deg/100ft Sect 1978.05S 4824.12W 3.00 5213.59 2034.22S 4897.92W 3.00 5302.92 2068.95S 4939.84W 3.00 5354.70K-2 2093.65S 4968.09W 3.00 5390.08 2156.18S 5034.45W 3.00 5474.84 2221.65S 5096.80W 3.00 5556.95 2278.49S 5145.72W 3.00 5623.41EOC 2289.83S 5155.03W 0.00 5636.25 2635.36S 5438.76W 0.00 6027.52 2980.88S 5722.49W 0.00 6418.78 3326.41 S 6006.22 W 0.00 6810.05 3671.94 S 6289.95 W 0.00 7201.32 4017.47 S 6573.68 W 0.00 7592.59 4061.43 S 6609.78 W 0.00 7642.36 Albian-97 4363.00 S 6857.41 W 0.00 7983.85 4708.53 S 7141.14 W 0.00 8375.12 5054.06 S 7424.87 W 0.00 8766.39 5087.92 S 7452.68 W 0.00 8804.74 Albian-96 5399.59 S 7708.60 W 0.00 9157.66 5745.12 S 7992.33 W 0.00 9548.92 6090.64S 8276.06W 0.00 9940.19 6432.40S 8556.69W 0.00 10327.18 HRZ 6436.17S 8559.79W 0.00 10331.46 6636.15S 8724.00W 0.00 10557.91K-1 6781.70S 8843.52W 0.00 10722.73 6872.32 S 8917.93 W 0.00 10825.34 LCU 7040.57 S 9056.09 W 0.00 11015.86 Miluveach A 7057.55 S 9070.03 W 0.00 11035.09 Alpine D 7110.03 S 9113.13 W 0.00 11094.52 CD2-33 PB2 Tgt Rvsd 5-Jun-01 7127.23 S 9127.25 W 0.00 11113.99 7216.54 S 9200.59 W 0.00 11215.13 Base Alpine 7361.64 S 9319.73 W 0.00 11379.43 TD Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33PB2 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 Comments in wellpath ==================== MD TVD Rectangular Coords. Comment 7000.00 3856 59 1751.25 S 4408.08 W KOP - Sidetrack Pt. 7659.09 4072 7983.59 4208 10563.61 5364 12049.00 6029 13994.53 6900 14289.38 7032 14631.13 7185 14874.60 7294 14899.17 7305 14975.12 7339 15129.24 7408 15339.20 7502 00 2068.95 S 4939.84 W K-2 94 2278.49 S 5145.72 W EOC 00 4061.43 S 6609.78 W Albian-97 00 5087.92 S 7452.68 W Albian-96 00 6432.40 S 8556.69 W HRZ 00 6636.15 S 8724.00 W K-1 00 6872.32 S 8917.93 W LCU 00 7040.57 S 9056.09 W Miluveach A 00 7057.55 S 9070.03 W Alpine D 00 7110.03 S 9113.13 W CD2-33 PB2 Tgt Rvsd 5-Jun-01 00 7216.54 S 9200.59 W Base Alpine 00 7361.64 S 9319.73 W TD Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.15 1572.64S 3958.51W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised CD2-33 PB2 Tgt Rvsd 362484.000,5967509.000,0.0000 7339.00 7110.03S 9113.13W 5-Jun-2001 CD2-33 PB2 TD Rvsd 5 362295.300,5967276.090,0.0000 7502.00 7346.12S 9297.88W 5-Jun-2001 CD2-33PB2 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB2 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB2 Version#ii Our ref : prop4551 License : Date printed : 5-Jun-2001 Date created : 15-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33PB2 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 1 Your ref : 33 PB2 Version#ii Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O 0 R D S G E 0 G R A P H I C Depth Degrees Degrees Depth 0.00 0.00 0.00 0.00 100.00 0.00 248.33 100.00 200.00 0.00 248.33 200.00 300.00 0.00 248.33 300.00 400.00 0.00 248.33 400.00 500.00 0.00 248.33 500.00 600.00 1.00 248.33 599.99 700.00 2.00 248.33 699.96 800.00 3.00 248.33 799.86 900.00 4.00 248.33 899.68 1000.00 6.00 248.33 999.29 1100.00 8.00 248.33 1098.54 1200.00 10.00 248.33 1197.30 1300.00 12.00 248.33 1295.46 1400.00 14.00 248.33 1392.89 1500.00 16.00 248 33 1489.48 1600.00 18.00 248 33 1585.11 1700.00 20.00 24833 1679.65 1800.00 22.00 24833 1773.01 1900.00 24.00 24833 1865.05 2000.00 26.00 24833 1955.68 2100.00 28.00 24833 2044.77 2200.00 30.00 24833 2132.23 2299.99 33.00 24833 2217.48 2399.99 36.00 24833 2299.88 2499.99 39.00 248.33 2379.21 2599.99 42.00 248.33 2455.24 2699.99 45.00 248.33 2527.77 2799.99 48.00 248.33 2596.60 2899.99 51.00 248.33 2661.54 2999.99 54.00 248.33 2722.41 3099.99 57.00 248.33 2779.04 3199.99 60.00 248.33 2831.29 3299.99 63.00 248.33 2879.00 3399.99 66.00 248.33 2922.04 3499.99 69.00 248.33 2960.31 3599.99 72.00 248.33 2993.69 3699.99 75.00 248.33 3022.09 3711.77 75.35 248.33 3025.10 4000.00 75.35 248.33 3097.98 4500.00 75.35 248.33 3224.42 5000.00 75.35 248.33 3350.85 5500.00 75.35 248.33 3477.29 6000.00 75.35 248.33 3603.72 6500.00 75.35 248.33 3730.15 7000.00 75.35 248.33 3856.59 7100.00 73.94 245.59 3883.07 7200.00 72.56 242.81 3911.90 7300.00 71.21 239.99 3943.00 7400.00 69.91 237.12 3976.28 C 00 R D I N A T E S Easting Northing C O 0 R D I N A T E S 0.00S 0.00S 0.00S 0.00S 0.00S 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00S 0.32S 1.29S 2.90S 5.15S 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.81W 371714.45 5974463.08 n70 20 18.47 w151 2 27.46 3.24W 371712.01 5974462.15 n70 20 18.46 w151 2 27.53 7.30W 371707.93 5974460.61 n70 20 18.45 w151 2 27.65 12.97W 371702.22 5974458.45 n70 20 18.42 w151 2 27.82 8.37S 12.87S 18.65S 25.69S 34.00S 21.07W 371694.06 5974455.37 n70 20 18.39 w151 2 28.05 32.40W 371682.67 5974451.07 n70 20 18.35 w151 2 28.38 46.93W 371668.03 5974445.54 n70 20 18.29 w151 2 28.81 64.66W 371650.19 5974438.79 n70 20 18.22 w151 2 29.33 85.57W 371629.15 5974430.84 n70 20 18.14 w151 2 29.94 43.55S 54.34S 66.36S 79.60S 94.02S 109.62W 371604.94 5974421.70 n70 20 18.05 w151 2 30.64 136.79W 371577.59 5974411.37 n70 20 17.94 w151 2 31.43 167.05W 371547.14 5974399.86 n70 20 17.82 w151 2 32.32 200.35W 371513.62 5974387.19 n70 20 17.69 w151 2 33.29 236.66W 371477.07 5974373.39 n70 20 17.55 w151 2 34.35 109.62S 126.38S 144.28S 163.57S 184.48S 275.93W 371437.55 5974358.45 n70 20 17.40 w151 2 35.50 318.12W 371395.08 5974342.41 n70 20 17.23 w151 2 36.73 363.18W 371349.74 5974325.27 n70 20 17.06 w151 2 38.04 411.73W 371300.87 5974306.81 n70 20 16.87 w151 2 39.46 464.36W 371247.90 5974286.80 n70 20 16.66 w151 2 41.00 206.95S 230.93S 256.34S 283.12S 311.19S 520.93W 371190.96 5974265.28 n70 20 16.44 w151 2 42.65 581.27W 371130.22 5974242.33 n70 20 16.20 w151 2 44.41 645.24W 371065.84 5974218.01 n70 20 15.95 w151 2 46.28 712.64W 370998.00 5974192.38 n70 20 15.69 w151 2 48.25 783.30W 370926.88 5974165.51 n70 20 15.41 w151 2 50.31 340.48S 370.90S 402.38S 434.82S 468.14S 857.02W 370852.68 5974137.47 n70 20 15.12 w151 2 52.47 933.60W 370775.61 5974108.35 n70 20 14.82 w151 2 54.70 1012.83W 370695.86 5974078.22 n70 20 14.51 w151 2 57.02 1094.50W 370613.67 5974047.16 n70 20 14.20 w151 2 59.40 1178.37W 370529.25 5974015.27 n70 20 13.87 w151 3 01.85 502.25S 537.05S 572.45S 576.65S 679.61S 1264.22W 370442.85 5973982.62 n70 20 13.53 w151 3 04.36 1351.81W 370354.68 5973949.31 n70 20 13.19 w151 3 06.92 1440.91W 370265.01 5973915.43 n70 20 12.84 w151 3 09.52 1451.49W 370254.36 5973911,40 n70 20 12.80 w151 3 09.83 1710.65W 369993.52 5973812.85 n70 20 11.79 w151 3 17.39 858.22S 1036.82S 1215.43S 1394.03S 1572.64S 2160.22W 369541.03 5973641.88 n70 20 10.03 w151 3 30.52 2609.79W 369088.54 5973470.91 n70 20 08.27 w151 3 43.65 3059.36W 368636.05 5973299.95 n70 20 06.51 w151 3 56.77 3508.94W 368183.56 5973128.98 n70 20 04.75 w151 4 09.90 3958.51W 367731.07 5972958.01 n70 20 02.99 w151 4 23.02 1751.25S 1788.97S 1830.64S 1876.12S 1925.30S 4408.08W 367278.58 5972787.05 n70 20 01.23 w151 4 36.15 4496.81W 367189.23 5972750.83 n70 20 00.86 w151 4 38.74 4583.01W 367102.35 5972710.63 n70 20 00.45 w151 4 41.25 4666.45W 367018.16 5972666.57 n70 20 00.00 w151 4 43.69 4746.89W 366936.90 5972618.76 n70 19 59.52 w151 4 46.04 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33PB2 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 2 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O O R D S G E O G R A P H I C Depth Degrees Degrees Depth 7500.00 68.66 234.20 4011.66 7600.00 67.46 231.24 4049.02 7659.09 66.78 229.46 4072.00 7700.00 66.32 228.22 4088.28 7800.00 65.23 225.16 4129.33 7900.00 64.21 222.04 4172.04 7983.59 63.40 219.39 4208.94 8000.00 63.40 219.39 4216.29 8500.00 63.40 219.39 4440.14 9000.00 63.40 219.39 4663.98 9500.00 63.40 219.39 4887.83 10000.00 63.40 219.39 5111.68 10500.00 63.40 219.39 5335.52 10563.61 63.40 219.39 5364.00 11000.00 63.40 219.39 5559.37 11500.00 63.40 219.39 5783.22 12000.00 63.40 219.39 6007.06 12049.00 63.40 219.39 6029.00 12500.00 63.40 219.39 6230.91 13000.00 63.40 219.39 6454.75 13500.00 63.40 219.39 6678.60 13994.53 63.40 219.39 6900.00 14000.00 63.40 219.39 6902.45 14289.38 63.40 219.39 7032.00 14500.00 63.40 219.39 7126.29 14631.13 63.40 219.39 7185.00 14874.60 63.40 219.39 7294.00 14899.17 63.40 219.39 7305.00 14975.12 63.40 219.39 7339.00 15000.00 63.40 219.39 7350.14 15129.24 63.40 219.39 7408.00 15339.20 63.40 219.39 7502.00 C O O R D I N A T E S Easting Northing C 00 R D I N A T E S 1978.05S 2034.22S 2068.95S 2093.65S 2156.18S 4824.12W 366858.80 5972567.33 n70 19 59.00 w151 4 48.29 4897.92W 366784.06 5972512.42 n70 19 58.44 w151 4 50.44 4939.84W 366741.57 5972478.40 n70 19 58.10 w151 4 51.67 4968.09W 366712.90 5972454.19 n70 19 57.86 w151 4 52.49 5034.45W 366645.51 5972392.79 n70 19 57.24 w151 4 54.43 2221.65S 2278.49S 2289.83S 2635.36S 2980.88S 5096.80W 366582.06 5972328.40 n70 19 56.60 w151 4 56.25 5145.72W 366532.19 5972272.39 n70 19 56.04 w151 4 57.67 5155.03W 366522.69 5972261.22 n70 19 55.93 w151 4 57.95 5438.76W 366233.18 5971920.56 n70 19 52.53 w151 5 06.22 5722.49W 365943.67 5971579.91 n70 19 49.13 w151 5 14.49 3326.41S 3671.94S 4017.47S 4061.43S 4363.00S 6006.22W 365654.17 5971239.25 n70 19 45.72 w151 5 22.77 6289.95W 365364.66 5970898.60 n70 19 42.32 w151 5 31.04 6573.68W 365075.15 5970557.94 n70 19 38.92 w151 5 39.31 6609.78W 365038.32 5970514.60 n70 19 38.49 w151 5 40.37 6857.41W 364785.65 5970217.29 n70 19 35.52 w151 5 47.58 4708.53S 5054.06S 5087.92S 5399.59S 5745.12S 7141.14W 364496.14 5969876.63 n70 19 32.12 w151 5 55.86 7424.87W 364206.63 5969535.98 n70 19 28.72 w151 6 04.13 7452.68W 364178.26 5969502.59 n70 19 28.38 w151 6 04.94 7708.60W 363917.13 5969195.32 n70 19 25.32 w151 6 12.39 7992.33W 363627.62 5968854.67 n70 19 21.91 wlS1 6 20.66 6090.64S 6432.40S 6436.17S 6636.15S 6781.70S 8276.06W 363338.11 5968514.01 n70 19 18.51 w151 6 28.93 8556.69W 363051.77 5968177.08 n70 19 15.15 w151 6 37.11 8559.79W 363048.60 5968173.36 n70 19 15.11 w151 6 37.20 8724.00W 362881.05 5967976.20 n70 19 13.14 w151 6 41.98 8843.52W 362759.10 5967832.70 n70 19 11.71 w151 6 45.46 6872.32S 7040.57S 7057.55S 7110.03S 7127.23S 8917.93W 362683.17 5967743.36 n70 19 10.82 w151 6 47.63 9056.09W 362542.20 5967577.48 n70 19 09.16 w151 6 51.66 9070.03W 362527.97 5967560.74 n70 19 08.99 w151 6 52.06 9113.13W 362484.00 5967509.00 n70 19 08.48 w151 6 53.32 9127.25W 362469.59 5967492.05 n70 19 08.31 w151 6 53.73 7216.54S 7361.64S 9200.59W 362394.76 5967403.99 n70 19 07.43 w151 6 55.86 9319.73W 362273.19 5967260.94 n70 19 06.00 w151 6 59.34 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33PB2 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CDg2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 Comments in wellpath .................... MD TVD Rectangular Coords. Comment 7000.00 3856 59 1751.25S 4408.08W KOP - Sidetrack Pt. 7659.09 4072 7983.59 4208 10563.61 5364 12049.00 6029 13994.53 6900 14289.38 7032 14631.13 7185 14874.60 7294 14899.17 7305 14975.12 7339 15129.24 7408 15339.20 7502 00 2068.95S 4939.84W K-2 94 2278.49S 5145.72W EOC 00 4061.43S 6609.78W Albian-97 00 5087.92S 7452.68W Albian-96 00 6432.40S 8556.69W HRZ 00 6636.15S 8724.00W K-1 00 6872.32S 8917.93W LCU 00 7040.57S 9056.09W Miluveach A 00 7057.55S 9070.03W Alpine D 00 7110.03S 9113.13W CD2-33 PB2 Tgt Rvsd 5-Jun-01 00 7216.54S 9200.59W Base Alpine 00 7361.64S 9319.73W TD Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.15 1572.64S 3958.51W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised CD2-33 PB2 Tgt Rvsd 362484.000,5967509.000,0.0000 7339.00 7110.03S 9113.13W 5-Jun-2001 CD2-33 PB2 TD Rvsd 5 362295.300,5967276.090,0.0000 7502.00 7346.12S 9297.88W 5-Jun-2001 TRANSMITAL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERfPARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME CHECK 1 CHECK WHAT APPLIES STANDARD LETTER "CLUE" DEVELOPMENT DEVELOPMENT REDRILL EXPLORATION INJECTION WELL INJECTION WELL REDRILL ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) HOLE (I~H) ~NUL~ DISPOSAL ( ) ~O ANNULAR DISPOSAL ( ) YES ANNULAR DISPOSAL THIS WELL DISPOSAL INTO OTHER ANNULUS ( ) YES + SPACING EXCEPTION The permit is for a new wellbore segment of existing well , Permit No, ~ API No. . Production should continue to be reported as a function of the original AP1 number stated above. In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). Annular disposal has not been requested... Annular Disposal of drilling wastes will not be approved... Annular Disposal of drilling wastes will not be approved... Please note that an disposal of fluids generated... Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Comoanv Name)will assume the liability of any protest to the spacing exception that may occur. Templates are located m drive\jody\templates American Express® Cash Advance Draft 141 Issued by Integrzted P=yment System, Inc. Englewood, Colorado Payable =t Norwest B~nk of Gr=nd Junction - Downtown. Gnmd Junction, Colorzdo ~: ~0 B ~00[,00~: 5 S ,,,0 ~ ?SOOO S 5~,'0 ~t, ~ WELL PERMIT CHECKLIST FIELD & POOL /'.2_~, ADMINISTRATION IAP_P_R DATE INIT CLASS ENGINEERING ;_E~x,) DATE -- · WELL NAME .~--~,~.- ~ 3 PROGRAM: exp ~' dev __ redrll __ serv ~ wellbore sag. ann. disposal para req ~ 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available' in drilling unit ............ 8. If deviated, is wellbore plat included ............. ·.. 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can.be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... GEOL AREA N N N N 14. Conductor stdng provided ................... [~ N 15. Surface casing protects all known USDWs. (~ N 16. CMT vol adequate to circulate on conductor & surf csg ..... N 17. CMT vol adequate to tie-in long string to surf csg. Y N 18. CMT will cover all known productive horizons. ' Y N 19. Casing designs adequate for C, T, B & permafrost ....... ~_ N 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ....... ; ..... ~ N 23. If diverter required, does it meet regulations .......... z~ N 24. Drilling.fluid program schematic & equip list adequate.. ~ . . ~J N 25. BOPEs, do they meet regulation. ............... ~ N 26. BOPE press rating appropriate; test to ~"~ psig. ~) N 27. Choke manifold complies w/APl RP-53 (May 84) ........ 03. N 28. Work will occur without operation shutdown ........... O~ N UNIT# ,.,~i~l~ . 5';,'3 .'~ ~'~3' ON/OFF SHORE 29. GEOLOGY 30. 31. 32. 34. ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ....... APPR DATE (B) will not contaminate freshwater; or cause drilling waste... to surface; (C) will not impair mechanical integrity of the Well used for diSposal; (D) will not damage producing formation or impair recovery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. GEOLOGY: ENGINEERING: UIC/Annular Is presence of H2S gas probable ................. Y (~ . _~.. ' Permit can be issued wlo hydrogen sulfide measui'es ...... Y N.,,/ Data presented on potential ove~ressure zones ....... Y Seismic analysis of shallow gas zones. ............ ~ Seabed ~ndition suwey (if off-shore) ............. ~,' Y N '/ ' '~ / ~// ' .' - / / ~ / ~ /~ / Conta~ name/phone for weekly progress repo~s [explorato~ only] Y N.~~ Y N Y N COMMISSION: Comments/Instructions: Z O -I Z --I -I- c:~nsoffice\wordian~diana\checklist (rev. 111011/00) ' FIELD & POOL /.2. <3 ./~,C5 ,. coMPANY/g;'ff",)/~, ~?~' '' .ADMINISTRATION INIT CLASS /~./ -- ENGINEERING APPR DATE WELL NAM~Z) ~-.~,.~/=~ 2 ~PROGRAM: exp 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available' in ddlling unit ............ 8. If deviated, is wellbore plat included ............. ... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can.be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... dev ~<~ redrll serv wellbore seg ann. disposal para req ~' GEOL AREA '~ ? ('2) UNIT# ,__3'-c:~,.~ ~ ON/OFF SHORE 14. Conductor string provided ................... Y N 15. Surface casing protects all known USDWs ........... Y N 16. CMT vol adequate to circulate on conductor & surf csg ..... Y N 17. CMT vol adequate to tie-in long string to surf csg ........ Y N 18. CMT will cover all known productive horizons ..... ' ..... Y N 19. Casing designs adequate for C, T, B & permafrost ....... Y' N 20. Adequate tankage or reserve pit ................. Y N 21. If a re-drill, has a 10-403 for abandonment been approved... Y N 22. Adequate wellbore separation proposed ............. Y N 23. If diverter required, does it meet regulations .......... Y N 24. Drilling.fluid program schematic & equip list adequate ..... Y N 25. BOPEs, do they meet regulation ................ Y N 26. BOPE press rating appropriate; test to psig. Y N 27. Choke manifold complieS w/APl RP-53 (May 84) ......... Y N 28. Work will occur without operation shutdown ........... Y N 29. [ GEOLOGY . 30. 31. ' 32. Il Al=PR D,~TE 33. Is presence of H2S gas probable ................. Y N Permit can be issued wlo hydrogen sulfide measures ...... Y N Data presented on potential oVerpressure zones , ...... .Y..~. seismic analysis of shallow gas zones ............. /~ Seabed condition survey (if off-shore) ............. ~' Contact name/phone for weekly progress reports [exploratory ortFy] Y N ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zonei ....... Y N APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the Well used for diSposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N ~:'" ENGINEERING: COMMISSION: ulCIAnnular Comments/Instructions: Z 0 "=4 Z .-I '-r-. c:~nsoffice\wordia n~iana\checklist (rev. 11/01//00) .. spenny-sun I:1 I=il LL.I ~ t:S SE~UI CE S PHILLIPS ALASKA INC. END OF WELL REPORT ALPINE CD2-33 B: lm a . g 5, m Sm TABLE OF CONTENTS General Information Daily Summary Daily Operations Show Reports Bit Record Mud Reports Survey Record Formation Evaluation Logs GENERAL WELL INFORMATION Company: Rig: Well: Field' Borough: State: Country: APl Number: Sperry-Sun Job Number: Job Start Date: Job End Date: Start Depth Logged: Total Depth Logged: Magnetic Declination: Dip Angle: Total Field Strength: Date Of Magnetic Data: Wellhead Coordinates N: 'Wellhead Coordinates W: Vertical Section Azimuth: SDL Engineers: Company Representatives: Company Geologist: SSDS Unit Number: Phillips Alaska Inc. Doyon Drilling No. 19 Alpine CD2-33 Alpine North Slope Alaska United States 50-103-20381-00 AKAM11119 July 17, 2001 July 31, 2001 5,858 ft. MD 21,464 ft. MD 25.34 deg 80.54 deg 1147.17 HCNT July 07, 2001 North 70 deg 20 min 18.48 sec East 151 deg 02 min 27.44 sec 248.30 deg Doug Wilson Wayne Hermanson Mark Lindloff Tom Mansfield Reg Wilson Dave Burley / Don Mickey Meg Kremer / Dave Bannan 104 Phillips Alaska Inc. - CD2-33 (Alpine West) Daily Summar 07-07-01 - Prepared BHA components. Worked on top drive. Made up mud motor and MWD equipment. Tested standpipe to 3500 psi. Drilled ice plug in conductor from 55' to 144'. Spudded well in at 05:00 hrs and drilled 12 ¼" hole to 2285'. Hole angle was built to 33° at an average azimuth of approximately 250° over the interval. 07-08-01 - Directional drilled 12 %" hole from 2285' to 2999' and pulled offbottom with pumps on. Hole packed off. Worked pipe and attempted to circulate - unable. Pulled up to 2711' and pumped at 100 gpm no returns - maximum over pull of 20k lbs. Ran in the hole to 2807'. Pumped at 100 gpm and established returns. Staged pumps up to 630 gpm and circulated to clean the hole with a rotary speed of 110 rpm. Washed and reamed two stands to bottom and continued to circulate to clean hole. Directional drilled 12 ¼" hole from 2999' to 3228' where rate of penetration dropped dramatically to 9 flJhr. Circulated to clean the hole with 670 gpm and a rotary speed of 110 rpm. Pumped a 35 bbl weighted 12.2 ppg sweep and circulated the hole clean. Monitored well - static. Tripped out with a maximum over pull of 40k lbs. Began swabbing at 1346'. Pumped out from 1346' to 550'. Continued to pull out of the hole. Laid down MWD, mud motor and bit. Bit balled up with shale/clay and dull. Hole angle was increased from 33° to 60° over the interval 2285' to 3228'. 07-09-01 - Made up BHA #2. Ran in the hole to 3090'. Precautionary washed and reamed to 3228'. Directional drilled 12 ¼" hole from 3228' to 4274' (3199'TVD). Hole angle was increased from 60° to 75° up to approximately 4000' where angle was held at an average azimuth of approximately 250°. 07-10-01 - Drilled 12 1/4" hole from 4374 to 5675' maintaining a hole angle of 75° at an azimuth of 250°. Heavy gravel caving problem from permafrost thaw was experienced. Circulated to clean hole. Drilled 12 ¼ hole from 5674' to 5710'. Hole angle and direction was maintained as before. 07-11-01 - Drilled 12 ¼" hole from 5710' to 5755'. Changed shaker screens on both shakers. Drill 12 ¼" hole from 5755' to 5781'. Repaired conveyor belt and changed breakers. Drilled 12 ¼" hole from 5782' to 5838'. Circulated and repaired conveyor. Circulated and condition mud for running casing. Pumped out of hole at 120'/hour while circulating four bottoms up. Pulled out of the hole to 1888'. Attempted to circulate and clean the hole - hole packing off. Pumped out of the hole from 1860' to 600' - hole tight and packing off. Pulled out of the hole from 600' with out pumps. Had to rotate pipe while pulling pipe to stop from swabbing hole. Experienced significant torque and over pull while working stabilizers into conductor shoe. Pulled and laid down MWD tools, mud motor and stabilizers. Bit partially balled with clay and gravel. 07-12-01 - Cleaned 'up rig floor and under rotary. Made up 12 ¼" hole opener and ran in the hole. Took weight at 170'. Washed and reamed from 170' to 1510'. Lost high line power. Washed and reamed from 1510' to 2275'. Ran in the hole from 2275' to 2754'. Broke circulation and washed to 2849'. Ran in from 2849' to 3421' and circulated. Ran in from 3421' to 4440' and circulated bottoms up. Ran in from 4440' to 5838'. Circulated hole clean with 3 bottoms up while rotating at 110 rpm. Pumped DryJob and pulled out of the hole to 3707' - hole was not taking the proper fill. Ran back to bottom. Circulated bottoms up and observed 500 units of gas at 2500 stks. Tripped out to 4661' - hole took proper fill. Monitored well - static. Tripped out from 4661' to 4155'. 07-13-01 - Pulled out of the hole from 4155' to 3870'. The last five stands showed signs of swabbing, therefore monitored the well - static. Pumped and reamed out of the hole from 3870' to 2390'. Circulated and monitored well - static. Continued to pump and ream out of the hole from 2390' to 355'. Pulled the bottom hole assembly and laid down the hole opener, stabilizer and drill collars. Hole opener was balled up with clay. Picked up wash tool and washed landing ring area. Rigged up to run 9 5/8" casing. Had pre-job safety meeting on running casing procedures. Ran 9 5/8" casing to 1540' where it began to take on weight. Washed and worked casing from 1540' to 1650'. Continued running casing to 1832' - unable to run without washing down. 07-14-01 - Continued washing 9 5/8" casing from 1832' to 2030'. Circulated the hole clean at 2030' with a pump rate of 315 gpm. Attempted to run two joints of casing without washing down- string took 40k lbs weight. Washed down remainder of casing to 5824'. Total joints ran 142. Installed tam port collar at 1014'. Circulated casing while rigging down casing equipment and cleaning floor area. Blew down top drive and installed cement head. Circulated and conditioned mud for cement job. Held pre-job safety meeting on cementing procedures. Cemented 9 5/8" casing. Pumped 40 bbls Biozan spacer, 100 bbls mud and 5 bbls water. Tested cement lines to 2500 psi. Dropped bottom plug. Mixed and pumped 50 bbls Arco spacer ~ 10.2 ppg and 731 bbls lead slurry at 10.7 ppg. Phillips Alaska Inc. - CD2-33 (Alpine West) Daily Summar 07-15-01 - Continued cementing 9 5/8" surface casing. Mixed and pumped 250 bbls of 15.8 ppg class "G" cement I00-125 gpm. Cement returns were observed after 80 bbls of tail pumped. No nut plug spacer observed ahead of cement. Dropped top plug and displaced with 20 bbls water and 416 bbls mud at 6 bbls/min. Lost returns after 350 bbls displacement, but hole stood full. Bumped plug with 1700 psi and floats held. Rigged down casing and cementing equipment. Pulled landing joint. Run wash tool and cleaned out BOP. Nippled down diverter. Nippled up BOP stack. Repaired leak in drawworks. Picked up elevator bails and installed wear bushing. Installed guards and EZ torque on drawworks. Laid down excess Hevi Weight drill pipe from Derrick. Laid down 8" drill collars and stabilizers. Picked up and ran in the hole with 45 joints of 5" drill pipe. 07-16-01 - Continued picking up 5" S 135 drill pipe - picked up a total of 159 joints. Circulated at 15 bbls/min to flush any possible scale out of drill pipe as a precaution for AutoTrack tool. Made up stands of 5" drill pipe. Made up bit sub with float and crossover. Picked up 5 .... G" drill pipe. Pulled wear bushing and set test plug. Tested BOP's 250/5000 psi as per program. Pulled test plug and set wear bushing. Blew down kill line, choke line and choke manifold. Made up 5" drill pipe stands - picked up 120 joints. Circulated at 630 gpm to flush scale from drill pipe. Pulled and racked 92 stands "G" drill pipe. 07-17-01 - Finished picking up 5" drill pipe. Circulated at 630 gpm to flush scale from drill pipe as precaution for AutoTrack tool. Pulled out of the hole and racked 55 stands of S" drill pipe. Held pre-job safety meeting and picked up AutoTrack GEN 2.5 system and 8.5" HC 605 bit. Loaded AutoTrack tripped in to 2232'. Filled String and pulse tested AutoTrack. Slipped and cut drill line and serviced top drive. Ran in to 5655'. Filled pipe every 2000'. Circulated air out of drill string before casing test. Rigged up and tested casing to 2500 psi for 30 min. Cleaned out float collar. Drilled plugs and collar. Drilled cement to shoe. Circulated thick cement contaminated mud out of hole. Drilled out float and cleaned cement out of rat hole to 5836'. Drilled 8 ½" hole from 5838' to 5858'. Circulated hole clean and conducted formation leak offtest to 14.0 ppg EMW (790 psi with 9.8 ppg mud). Note: Shoe did leak offat 14.0 ppg. Displaced mud out with 9.6 ppg Low Solids Non Dispersed mud system. Circulated casing shoe and established baseline ECD's. Opened AutoTrack. Rotary directional drilled 8 ½" hole from 5858' to 6004' Trouble shot AutoTrack system. Near bit inclinometer was not giving proper angles. The problem could not be corrected, therefore it was decided to drill ahead with the MWD inclinometer. Rotary directional drilled 8 ½" hole from 6004' to 6070' (TVD3634). Flow rate was 517 gpm, with a corresponding standpipe pressure of 1380 psi. Pipe was rotated at 110 rpm and weight on bit ranged from 10-15k lbs. 07-18-0I - Rotary directional drilled 8 ½" hole from 6070' to 7748' (4056'TVD. Flow rate was 520 gpm, with a corresponding standpipe pressure of 1580 psi. Pipe was rotated at 110-120 rpm and weight on bit ranged from 10-15k lbs. 07-19~01 - Rotary directional drilled 8 sA" hole from 7748' to 9592' (451 I'TVD). Flow rate was 520 gpm, with a corresponding standpipe pressure between 1500-1800 psi. Pipe was rotated at 120-130 rpm and weight on bit ranged from 10-20k lbs. 07-20-01 - Rotary directional drilled 8 ½" hole from 9592' to 10508' (4740'TVD). Flow rate was 520 gpm, with a corresponding standpipe pressure between 1800-1910 psi. Pipe was rotated at 120-130 rpm and weight on bit ranged from 12- 15k lbs. Double back reamed for 20-30 min before connections. Circulated and conditioned hole for wiper trip. Circulated 3 bottoms up at 520 gpm and 120 rpm. Wiper tripped from 10508' to shoe at 5824'. Hole was in good condition. Monitored well - static. Ran in to 9941' - hole in good condition. Precautionary washed and reamed from 9941' to 10508'. Max trip gas was 100 'units. Downlinked AutoTrack and took slow pump rates. Rotary directional drilled 8 ½" hole from 10508' to 10603' (4765'TVD). Flow rate was 520 gpm, with a corresponding standpipe pressure of 1890 psi. Pipe was rotated at 120 rpm and weight on bit ranged from 15-20k lbs. 07-21-01 - Rotary directional drilled 8 ½" hole from 10603' to 12126' (5148'TVD). Flow rate was 520 gpm, with a corresponding standpipe pressure between 2200-2300 psi. Pipe was rotated at 120-125 rpm and weight on bit ranged from 15- 22k lbs. Double back reamed before connection for 15-20 min. 07-22-01 - Rotary directional drilled 8 ½" hole from 12126' to 13839' (5581'TVD).). Flow rate was 560 gpm, with a corresponding standpipe pressure of 2230 psi. Pipe was rotated at 130-135 rpm and weight on bit was 20k lbs. Double back reamed before connections for approximately 15-20 min. 07-23-01 - Rotary directional drilled 8 ½" hole from 13839' to 14125' (5655'TVD) saver sub backed out in wrong place on the connection, therefore re-torqued saver sub. Rotary directional drilled 8 ½"hole from 14125' to 15362' (5969'TVD). Flow rate was 560 gpm, with a corresponding standpipe pressure between 2160-2350 psi. Pipe was rotated at 120-130 rpm and weight on bit ranged from 18-20k lbs. Double back reamed new hole before connections for approximately 15-20 min, Phillips Alaska Inc. - CD2-33 (Alpine West) Daily Summarlt 07-24-01 - Rotary directional drilled 8 ~A" hole from 15362' to17000' (6838'TVD). Flow rate was 560 gpm, with a corresponding standpipe pressure between 2200-2300 psi. Pipe was rotated at 125-130 rpm and weight on bit ranged from 18- 20k lbs. Double back reamed new hole before connections for approximately 20-25 min. 07-25-01 - Rotary directional drilled 8 ½" hole from 17000' to 18536' (6777'TVD). Flow rate was 560 gpm, with a corresponding standpipe pressure between 2200-2300 psi. Pipe was rotated at 125-130 rpm and weight on bit ranged from 15- 20k lbs. Triple back reamed new hole before connections for approximately 25-30 min. 07-26-01 - Rotary directional drilled 8 ½" hole from18536' to 18621' (6799'TVD). Flow rate was 565 gpm, with a corresponding standpipe pressure of 2050 psi. Pipe was rotated at 130 rpm and weight on bit was 20k lbs. Double back reamed before connections for approximately 25-30 min. Circulated, surveyed and closed AutoTrack tool. Pumped 40 bbl weighted HiVis sweep with marker dye and nut plug. Circulated at 560 gpm with 120 rpm. Sweep came back 200 bbls late. Sweep recognized by nut plug but did not see dye marker. Continued to circulate as above and pulled one stand every 30 minuets while circulating three bottoms up. At 17766' monitored well - static. Pulled out of hole from 17766' to 16341'. Hole took proper fluid and pipe pulled with no problem. Pumped DryJob. Continued pulling out of hole from 16341' to 12186'. Worked various tight spots from 14941' with 45-55k lbs over pull. Rotated while circulating bottoms up. Did not observe any excessive amount of cuttings at bottoms up. Tripped out - hole still pulling tight. Pumped and rotated out from 12092' to 10480'. Circulated at 550 gpm and 120 rpm to clean hole. Racked back two stands while circulating. 07-27-01 -Flow checked and continued pulling out of hole from 10280' to 8360'. Tight spots encountered at 9815'-9720', 9626'-9530' and 8480'-8390'. Back reamed past tight spot at 8360' and attempted to pull conventionally - no success. Back. reamed out from 8360' to 6363' at a flow rate of 420 gpm and rotary speed of 110 rpm. Worked pipe at 6363' and continued to back ream up into 9 5/8" casing. Circulated bottoms up at the shoe and monitored well - static. Tripped out slowly because hole was trying to swab. Monitored well - static. Circulated - observed large amount of cuttings at bottoms up. Monitored well - static. Pulled to bottom hole assembly. Changed out jars. Laid down flex collars. Laid down BHI AutoTrack and bit. Changed out saver sub on top drive IBOP. Ran test plug and tested BOP's and equipment to 250/5000 psi and annular to 3500 psi. 07-28-01 - Tested BOP's and associated equipment to 250/5000 psi. Pulled test plug and set wear bushings. Made up BHA #5. Loaded radio, active source in MWD and made up remaining bottom hole assembly. Ran in the hole to 5795', filled pipe every 2000'. Cut 120' and slipped 60' drilling line, adjusted brakes and serviced top drive. Continued running in the hole from 5795' to 12075', filled drill pipe every 2000'. Circulated bottoms up. Ran in the hole from 12075' to 17321', filled pipe every 2000'. Started to take weight at 17321'. Washed and reamed through a tight spot at 17321'. Continued precautionary wash and ream to bottom while adding 5% Glydri.ll GP to mud system. Hole packed offat 17695' while reaming, it took 30 minutes to clear up the problem. Took base line ECD and checked surveys with Anadrill tools. 07-29-01 - Washed and reamed from 18598' to 18620' adding 5% Glydril and weighting up mud system to 10.4 ppg. Drilled 8 ½" hole from 18620' to 20082' (TVD 7195'). Flow rate was 550 gpm, with a corresponding standpipe pressure of 2800 psi. Pipe was rotated at 95-110 rpm and weight on bit ranged from 10-17k lbs. Back reamed before connection. 07-30-01 - Drill 8 ½" hole from 20082' to 20641' (TVD7336'). Circulated and worked pipe while repairing mud pump #1. Drill 8 ~A" hole from 20641' to 21284' (7541'TVD). Experienced a drop in return flow and lower pump pressure. Trouble shot pumps and determined that isolation valve washed out on # 2 pump. Circulated to clean up hole before shutting down to repair isolation valve. Repaired isolation valve in pump room. Circulated with pump #1 at 420 gpm while repairing discharge module washed out behind valve seat. 07-31-01 - Circulated at 2184' with a pump rate of 420 gpm and rotated pipe at 120 rpm. Reciprocated pipe while replacing fluid end module on pump #2. Circulated with a pump rate of 420 gpm and rotated pipe at 100 rpm. Set back stands every ½ hour to 20700' while repairing pump # 2. Circulated at a pump rate of 340 gpm while rotating and running in stands at ½ hour intervals to 20900'. Continued in the hole to 2127' using both pumps. Drilled 8 ½" hole from 21284' to 21464' (7575TVD) pumped a HiVis sweep at a pump rate of 550 gpm, standpipe pressure of 2660 psi and rotated at 120 rpm. Reciprocated pipe until sweep was out of the hole and shakers cleaning up. Pulled out of the hole, back reaming the whole way from 21464' to 20078'm, pumping at 420 gpm and rotating at 120 rpm. Back reamed out of the hole slowly, working tight hole from 20630' to 20078', circulating at 420 gpm and rotating at 110 rpm. Phillips Alaska Inc. - CD2-33 (Alpine West) Daily Summary 08-01-01 - Back reamed out from 20078' to 19910' at 30 min/std. Circulation rate was 420 gpm, rotating at 120 rpm. Hole packed off. Worked to regain circulation, but were unable to pump above 150 gpm without packing off. Worked pipe from 19910' to 19614' - unable to work down without packing off. Established full pump rate. Circulated bottoms up at a pump rate of 550 gpm and pump pressure of 2570 psi. Worked pipe from 19614' to 19707' with a rotary speed of 120 rpm. After bottom up hole continued to pack off. Back reamed out from 19614' to 19315' - hole packed off intermittently. Circulated bottoms up while back reaming from 19315' to 19200'. Circulated at 550 gpm and a pump pressure of 2550 psi - hole conditions showed improvement. 08-02-01 - Back reamed from 19200' to 18125' at 20-30 min/std, circulating at 550 gpm and rotating at 120 rpm. Pulled out of the hole from 18125' to 17206'. Back reamed and worked through a tight spot at 17206' Pulled out of the hole from 17150' to 15880' - pulled 40-60k lbs over pull. Back reamed tight spots from 15880' to 15830', circulating at 550 gpm and rotating at 120 rpm. Tripped out from 15830' to 14880' - pulled 40-75k lbs over pull. Pulled into tight spot at 14880' and jarred down for 15 min to free pipe. Back reamed from 14900' to 18840', circulating at 550 gpm and rotating at 120 rpm over a 30 rain period. Pulled out of hole from 14840' to 14600' - pulled 40-75k lbs over pull. Hit tight spot at 14600' and jarred down for 40 min before pipe pulled free. Back ream from 14600' to 14510'. Hit tight spot at 14510'. Jarred down and pipe came free. Back reamed from 14510' to 14433' circulating at 550 gpm and rotated at 120 rpm with a pump pressure of 2010 psi. Back reamed from 14433' to 13879'. Attempted to pull pipe but could not pass 13788' with 50k lbs over pull because of sticky hole. Back reamed from 13879' to 13217'. 08-03-01 - Back reamed from 13217' to 12261' at 1000-2000 fph. Slowed to a pull rate of 200 fph between 12700' to 12580' due to string over pull and torque. Attempted to pull pipe - could not pass through 12200' with 50k lbs over pull. Back reamed from 12261 to 11672' at a pump rate of 550 gpm and standpipe pressure of 1990 psi while rotating at 120 rpm. Pipe became stuck at 11672' -jarred down to free pipe. Back reamed from 11672 to 11595' at a pump rate of 550 gpm and standpipe pressure of 1990 psi while rotating at 120 rpm. Unable to break out stand with top drive, therefore circulated and reciprocated pipe while repairing top drive reverse contactors in SCR. Back reamed from 1 t 595' to 8644' at a pump rate of 550 gpm and standpipe pressure of 1900 psi while rotating at 125 rpm. Pulled out of the hole from 8450' to shoe. Over pull gradually increased to 45k lbs for last 40' pulled. Back reamed from 11595' to 8644' at a pump rate of 550 gpm and standpipe pressure of 1800 psi while rotating at 125 rpm. Pumped 40 bbl 12.4 ppg HiVis sweep. Tripped out to bottom hole assembly with no problems. Stood back HWDP and jars. Removed source from LWD. 08-04-01 - Finished removing source from LWD tools. Laid down MWD/LWD, mud motor and bit. Performed preventive maintenance on top drive. Disassembled and repaired torque wrench on top drive, Picked up 2256' of 3 IA" drill pipe stinger and mule shoe. Tripped in to 5777'. Slipped and cut 80' drilling line. Installed shims on guide dolly rollers to align top drive more over hole. Run in hole 'with 3 ½" drill pipe stinger on 5" drill pipe. Wash and ream 56' to bottom. Pumped 40 bbl weighted HiVis pill. Circulated & conditioned mud/hole prior to setting "plug and abandon" Plug #1, 08-05-01 - Pumped 40 bbl weighted HiVis pill. Circulated and conditioned mud/hole prior to setting P&A plug #1. Wiper tripped 10 stands to check hole condition before cementing. Rigged up and pressure tested cement lines. Pumped and set P&A cement plug #1 from 21454' to 20790'. (47.7 bbls at 15.8 ppg, "G" cement). Pulled out of the hole to top of plug #1. Circulated and conditioned mud at 20790'. Pumped at 550 gpm, with a pump pressure of 2820 psi and rotated at 70 rpm. Rigged up and pressure tested cement lines. Pumped and set a P&A cement plug #2 from 20883' to 20340' with 52 bbls of 15.8 ppg cement. Displaced cement to equalization. Pulled out to 19025'. Circulated to clean DP. Monitored well - static. Pumped DryJob. Pulled out of the hole from 19025' to 6535'. Circulated bottoms up. Pumped 60 bbls of 13.0 ppg HiVis pill. Displaced to equalization. Pulled out of the hole to 6250'. Circulated and conditioned mud for cementing. Plugged back 8 1/2"open hole and 9 5/8" casing from 6250' with 490 sacks of 17.0 ppg cement slurry. Displaced cement to equalization. Pulled out of the hole slowly to 5677'. Circulated bottoms up. Dumped 45 bbls of cement contaminated mud. Pulled out of the hole laying down 5" dill pipe. Phillips Alaska Inc. - CD2-33 (Alpine West) Daily Operations (I.A.D.C.) Time (hfs) 07-07-2001 00004)030 0030-0130 0130..0230 0230.0330 O330.,O500 0580.2400 074)8.2001 0000..0900 0900-1145 Elapsed Code Operations Breakdown Time 0.58 I Complete planned maintenance in SCR house. 1145-1215 1215-1630 1630-1800 1800-2400 07~9-2001 0000-0200 0200..0500 0500-2400 07~0.2001 0000-2200 2200-2330 2330-2400 07~t-2001 00004)030 00304)130 01304)200 02004)330 03304)430 04304)500 0500-0530 05304)800 0800-1100 1100.1500 1500-1600 1600-2000 200O-2230 2230-2400 07-12.2001 00004)100 01004)600 06004)700 07004)830 08304)900 0900-1000 1000-1100 1100-1200 t200-1300 1300~645 1645-1700 1700-1900 1900-1930 1930-2130 2130-2300 2300-2330 2330-2400 1.00 1.00 1.00 1.50 19.00 9.00 2.75 0.50 4.25 1.50 6.00 2.00 2~0 19.00 22.00 1 .S0 1.00 0.50 1.00 0.50 1.50 1.00 0.50 0.50 2.60 3.00 4.00 1.00 4.00 2.50 1 .fl0 1.00 5.00 1.00 1 .$0 0.50 1 1.00 1.00 1.00 3.75 0.25 2.00 O.flO 2.00 1.50 0.50 O.SO 21 Move BHA components to floor. Install bell guide on top drive. Hang rotary tongs. 6 PJSM & make up mud motor & MWD 15 Perform diverter test. 21 Fill conductor & test standpipe to 3500 psi. Clean ice plug in conductor from 55' to 114'. 2 Spud well & drill 12 W' hole from 114' to 2285'. Directional drill 12 ~/," hole from 2285' to 2999'. After kelly down at 2999' pulled off bottom with pumps on. Hole packed off. Worked pipe & attempted to circulate - unable. Pulled up to 2711' & pumped at 105 gpm with no returns & max over pull of 20k lbs. RIH to 2807' pumping at 105 gpm & established retums. Staged pumps up to 630 gpm & circulated to clean the hole with 110 rpm on DP. Washed & reamed 2 stands to bottom. Continued to wash & ream hole. Change out tom shaker screens & wash pans below shaker. Directional drill 12 %" hole from 2999' to 3228', ROP dropped dramatically to 9 ft/hr. Circulate to clean hole with 670 gpm & 110 rpm. Pumped 35 bbl weighted 12.2 ppg sweep & circulate hole clean - monitor well - static. POOH with a max over pull of 40k lbs. Began swabbing at 1346'. Pump out from 1346' to 550'. Continue to POOH. Lay down MWD, motor & bit. Bit balled & dull. 6 PJSM & make up BHA #2. 6 RIH to 3090'. Precautionary wash & ream to 3228'. 2 Directional drill 12 ~/4" hole from 3228' to 4274' (3199'TVD) 2 Drill 12 W' hole from 4274' to 5675'. Heavy gravel caving problem from permafrost thaw. 5 Circulate to clean hole. 2 Drill 12 V4" hole from 6675' to 6'710'. Drill 12 W' hole from 5710' to 5755'. Change shaker screens on both shakers. Drill 12 ¥4" hole from 5755' to 5782' Repair conveyor belt & change breakers. Drill 12 W' hole from 5782' to 5038'. Circulate. Repair conveyor. Circulate & condition mud for running casing. Pump out of hole at 120'Iht while circulating 4 bottoms up. POOH to 1888'. Tight hole at 1888'. Attempt to circulate & clean hole - hole packing off. Pump out of hole from 1860' to 600' - hole tight & packing off. POOH from 600' without pumps. Had to rotate pipe while pulling pipe to stop from swabbing hole. Significant torque & over pull while working stabilizers into conductor shoe. Pull & lay down MWD tools, mud motor & stabilizers. Bit partially balled with clay & gravel. 21 Clean up rig floor & under rotary. 6 Make up 12 W' hole opener & RIH. Took weight at 170'. Wash & ream from 170' to 1510'. 21 Lost high line power. 3 Wash & ream from 1510' to 2275'. 6 RIH from 2275' to 2754'. Break circulation & wash to 2849'. 6 RIH from 2849' to 3421'. Circulate, 6 RIH from 3421' to 4440'. 5 Circulate bottoms up at 4440'. 6 RIH from 4440' to 5838'. 5 Circulate hole clean with 3 bottoms up while rotating at 110 rpm. Monitor well - static. 5 Pump Dry Job. 6 POOH to 3707' - hole not taking proper fill. 6 RIH to bottom. S Circulate bottoms up. Observed 500 units of gas at 2500 stks. 6 POOH to 4661' - hole took proper fill. 21 Monitor well - static. 6 POOH from 4661' to 4t55'. Phillips Alaska Inc. - CD2-33 (Alpine West) Daily Operations (I.A.D.C.) Time {hfs} 07-13-2901 0000-0100 0100-0330 0330.0430 0430-1100 1100-1200 12OO-1300 1300-1330 1330-1530 1530-1600 1600-1900 19OO-2130 2130-2400 07-14-2001 0000-0100 0100-0130 0130-1630 Elapsed Code Operations Breakdown Time 1.00 6 POOH from 4155' to 3870'. The last $ stands showed signs of swabbing, therefore monitor well - static. 1630-1800 1800-2030 2030~100 2100~4OO 0000.0300 O300.04OO 0400.0500 05004)730 073O-O9OO 0900-1200 1200-1730 1730~830 1830-1930 1930~100 2100~2200 2200~4O0 0000-0330 0330.0400 04O0.0530 0530-0700 0700.0730 0730.08O0 0800-0900 0900-1430 1430-1500 15O0-1830 1830-1900 1900-2400 07-17~2001 0000-0O30 0030-0100 0100-0330 0330.0430 0430-0500 0~00-0700 0700.0730 0730-0900 0900.1200 1200-1230 1230-1330 2.50 1.00 6.50 1.00 1.00 0.50 2.00 0.50 3.00 2.50 2.50 1.00 0.50 16.00 1.50 2.50 0.50 3.00 3.00 1.00 1.00 2.~0 1.50 3.00 5.50 1.OO 1.00 1.50 1.00 2.00 3.50 O.SO 1.50 1.50 0.50 0.50 1.00 5.50 0.50 3.50 0.50 S.O0 0.S0 0.5O 2.50 1.00 0.50 2.00 0.50 1 .SO 3.00 0.50 1.00 3 Pump & ream out of hole from 3870' to 2390'. 6 Circulate & monitor well - static. 3 Continue to pump & ream out of hole from 2390' to 355'. 6 POOH with no problem. 6 Lay down hole opener, stabilizer & DC's. Hole opener balled up. Clean rig floor. 21 Pick up wash tool & wash landing ring area. 12 Rig up to mn 9 5/8" casing. 12 PJSM on casing running procedures. 12 Run 9 5/8" casing to 1540' where it began taking weight. (40# L-80 BTC) 12 Wash & work casing from 1540' to 1650'. 12 Continue running casing to 1832' - unable to run in without washing down. 12 Continue washing 9 5/8" casing from 1832' to 2030'. 12 Circulate hole clean at 2030' at 315 gpm. 12 Attempt to run 2 joints casing without washing down - string took 40k lbs weight. Washed down remainder of casing to 5824'. Total joints ran 142. Installed tam port collar at 1014'. 5 Circulate casing while rigging down casing equipment & cleaning floor area. Blow down top drive & install cement head. 5 Circulate & condition mud for cement job. 12 PJSM on cementing procedures. 12 Cement 9 5/8" casing. Pumped 40 bbls Biozan spacer, 100 bbls mud & 5 bbls water. Test lines to 2500 psi, drop bottom plug, mix & pump 50 bbls Arco spacer ~ 10.2 ppg & 731 bbls lead slurry ~ 10.7 ppg. 12 Continue cementing 9 5/8" surface casing. Mix & pump 250 bbls 15.8 ppg class "G" at 100 to 125 gpm. Cement retums after 80 bbls of tail pumped. No nut plug spacer observed ahead of cement. Dropped top plug & displaced with 20 bbls water & 416 bbls mud at 250 gpm. Lost returns after 350 bbls displacement, but hole stood full. Bumped plug with 1700 psi & floats held OK. 12 Rig down casing & cementing equipment. Pull landing joint. 21 Run wash tool & clean out BOP. t4 Nipple down diverter. 14 Nipple up Unihead & test to 1000 psi. 14 Nipple up BOP stack. 8 Repair leak in drawworks. 21 Pick up elevator bails & install wear bushing. 8 Install guards & EZ torque on drawworks. 6 Lay out excess HWDP from derrick. 6 Lay down 8" DC's & stabilizers. 6 Pick up & RIH with 45 joints 5" DP. 6 Continue picking up 5" S 135 DP - picked up a total of 159 joints. 5 Circulate at 630 gpm to flush any possible scale out of DP as precaution for AutoTrack tool. 6 Make up stands of 5" DP. '6 Make up bit sub with float & crossover. Pick up 5" "G" DP from pipe shed - 45 joints. 5 Circulate at 630 gpm to flush DP of any possible scale as before. 6 Make up 15 stands of 5 .... G" DP. 15 Pull wear bushing & set test plug. 15 Test BOP's 250150oopsi as per program. Witnessed by Chuck Scheve of AOGCC. 15 Pull test plug & set wear bushing. Blow down kill line, choke line & choke manifold. 6 Make up 5" DP in stands - picked up 120 joints. 5 Circulate at 630 gpm to flush scale in DP. 6 Pull & rack 92 stands "G*' DP. 6 Finish picking up 5" DP. 5 Circulate at 630 gpm to flush scale from DP as a precaution for AutoTrack. 6 POOH & rack 55 stands of 5" DP. 6 PJSM & pick up AutoTrack Gen 2.5 system & 8 ½" HC 605 bit. 20 Load AutoTrack. 6 RIH to 2232'. 20 Fill string & pulse test AutoTrack. 9 Slip & cut drill line & service top drive. 6 RIH to 5655'. Fill pipe every 2000'. 5 Circulate air out of drill string before casing test. 15 Rig up & test casing to 2500 psi for 30 min. Phillips Alaska Inc. - CD2-33 (Alpine West) Daily Operations (I.A.D,C.) Time {hrs,) Elapsed Code Time 1330-1500 Operations Breakdown 21 Clean out float collar. Drill plugs & collar. Drill cement to shoe. 1.50 1 500-1 530 0.50 5 1530-1600 1600-1630 1630-1800 1800-1930 1930~030 2030-2200 2200-2300 2300-2400 07-18-2001 0000-2400 07-19-2001 0000-2400 07-20-2001 0000-1130 1130-1430 1430-1800 1800~030 2030~230 2230~300 2300~400 07-21-2001 0000-2400 0000-2400 07-23.2001 0000.0400 0400.0430 0430-2400 07-24-2001 0000-2400 07-25-2001 0000.2400 0000.0130 0130-0200 0200-0400 0400.0930 0930-1130 113O-1630 1630-1800 1800-2230 2230-2400 0.56 0.50 1.50 1.~0 1.00 1.50 1.00 1.00 24.00 24.00 11.50 3.00 3.60 2.50 2.00 0.50 0.50 24.00 24.00 4.00 0.50 19.50 24.00 24.00 0.50 2.00 5.50 2.00 5.00 1.50 4.50 1.50 Circulate thick cement contaminated mud out of hole. 21 Drill out float & clean cement out of rat hole to 5836'. 2 Drill 8 ~/2" hole from 5838' to 5850'. 21 Circulate hole clean & conduct LOT to 14.0 ppg EMW (790 psi with 9.8 ppg mud). Shoe leaked off at 14.0 Ppg. 5 Displace mud out of hole with 9.6 ppg Low Solids Non Dispersed mud system. $ Circulate casing shoe & establish base line ECD's. Open AutoTrack. 2 Rotary directional drill 8 ½" hole from 5058' to 6004'. 20 Trouble shoot AutoTrack system. Near bit inclinometer not giving proper angles. Could not correct problem. Decided to drill ahead with MWD inclinometer. 2 Rotary directional drill 8 %" hole from 6004' to 6070' (TVD 3634') 517 gpm, 1380 psi, 110 rpm, 10-16k WOB Rotary directional drill 8 Y2" hole from 6070' to 7748' (4056'TVD) 520 gpm, 1580 psi, 100-120 rpm, 10-15k WOB Rotary directional drill 8 1/2" hole from 7748' to 9592' (4511'TVD) 520 gpm, 1500.1800 psi, 120-130 rpm, 10- 20k WOB. Double back ream before connections. 2 Rotary directional drill 8 ~/2" hole from 9592' to 10508' (4740'TVD) 520 gpm, 1800.1910 psi, 120-130 rpm, 12- 15k WOB. Double back ream before connections. 5 Circulate & condition hole for wiper trip. Circulate 3 bottoms up at 520 gpm & 120 rpm. 6 Wiper trip from 10508' to shoe at 5824'. Hole in good condition. Monitor well - static. 6 RIH to 9941' - hole in good condition. 3 Precautionary wash & ream from 9941' to 10508'. Max trip gas 100 units. 21 Downlink Autotrack & take slow pump rates. 2 Rotary directional drill 8 ~/2" hole from 10508' to 10603' (4765'TVD) 520 gpm, 1890 psi, 120 rpm, 15-20k WOB. Rotary directional drill 8 W' hole from 10603' to 12126' (5148'TVD) 520-550 gpm, 2200-2300 psi, 120-125 rpm, 15-22k WOB. Double back ream before connection for 15-20 min. Rotary directional drill 8 Y=" hole from 12126' to 13839' (5f181'TVD) 560 gpm, 2230 psi, 130-135 rpm, 20k WOB. Double back ream before connections. 2 Rotary directional drill 8 W' hole from 13839' to 14125' (5655'TVD) 21 Saver sub backed out in wrong place on connection, therefore re-torque saver sub. 2 Rotary directional drill 8 %" hole from 14125' to 15362' (5969'TVD) 560 gpm, 2160-2350 psi, 120,130 rpm, 18- 20k WOB. Double back ream before connections. Rotary directional drill 8 ½" hole from 15362' to 17000' (6838'TVD) 560 gpm, 2200-2300 psi, 125-130 rpm, 15. 22k WOB. Double back ream before connection for 15-20 min. Rotary directional drill 8 W' hole from 17000' to 18536' (6777'TVD) 560 gpm, 2200-2300 psi, 125-130 rpm, 15. 22k WOB. Triple back ream before connection for 25-30 min. 2 Rotary directional drill 8 W' hole from 18536' to 18621' (6799'TVD) 565 gpm, 2050 psi, 130 rpm, 20k WOB. Double back ream before connections. 5 Circulate, survey & close AutoTrack tool. 5 Pump 40 bbl weighted HiVis sweep with marker dye & nut plug. Circulate at 560 gpm with 120 rpm. Sweep came back 200 bbls late. Sweep recognized by nut plug but did not see dye marker. 5 Continue to circulate as above & pull 1 stand every 30 rain while circulating 3 bottoms up. At 17766' monitor well - static. 6 POOH from 17766' to 16341'. Hole took proper fluid & pipe pulled with no problem. 6 Pump DryJob. POOH from 16341' to 12186'. Work various tight spots from 14941' with 45-55k over pull. 5 Circulate & rotate while circulating bottoms up. Did not observe any excessive amount of cuttings at bottoms up. 6 POOH - hole still pulling tight pump & rotate out from 12092' to 10480'. 5 Circulate at 550 gpm & 120 rpm to clean hole. Rack back 2 stands while circulating. Phillips AlaSka Inc. - CD2-33 (Alpine West) Daily Operations (I.A.D.C.) Time (hrs) 07-27.2001 Elapsed Code Operations Breakdown Time 2.50 6 Flow check & continue POOH from 10280' to 8360'. Tight spots at 9815'-9720', 9626'-9530' & 8480'-8390'. 0000-0230 0230-0300 0300-1100 1100-1200 1200-1330 1330-1400 1400-1630 1630-1900 1900-2000 2000-2100 2100-2400 0000-0430 0430-0700 0700-0930 0930-1100 1100-1430 1430-1630 1630-1800 1800-2330 2330-2400 o7~29;2oo~ 0000-0030 0030-2400 0713012001 O0OO10O0 1000-1200 1200.3200 2200-2230 2230-2300 2300-2400 0713112OOl 0000-0100 01004)600 06004)730 07304)830 0830-1100 1100-1400 1400-1700 1700-2400 0810112OOl 00004)230 0230-1200 1200-2200 2200-2400 08/02/2001 00004)930 0930-1t30 1130-1215 1215-1400 1400-1430 0.50 8.00 1.00 1.50 0.50 1.50 2.60 1.00 1.00 3.00' 4.50 2.50 2.50 1.50 3.50 1.00 2.S0 6.50 0.50 0.60 23.50 10.00 2.00 10.00 0.50 0.50 1.00 1.00 5.00 1.50 1.00 2.50 3.00 3.50 6.50 2.50 9.50 10.00 9.50 2.00 0.76 1.75 0.50 Back ream past tight spot at 8360' & attempt to pull conventionally - no success. Back ream out from 8360' to 6363' at 420 gpm & 110 rpm - worked pipe at 6363' & continued to back ream up into 9 5/8" casing. Circulate bottoms up at shoe & monitor well - static. POOH - pulled slowly because hole trying to swab. Monitor well - static. Cimulate - observe large amount of cuttings at bottoms up. Monitor well - static. POOH to BHA. Change out jars. Lay down flex collars. Lay down BHI AutoTrack & bit. Change out saver sub on top drive. Pull wear bushing. Blow down top drive. Hang out wear sub on test joint. PJSM for BOP test while trouble shooting top drive IBOP. Run test plug & test BOP & equipment to 25015000 psi & annular to 3500 psi. 15 Test BOP's & associated equipment to 25015000 psi. Pull test plug & set wear bushing. 6 Make up BHA #5. Load radio active source in MWD & make up remaining BHA. 6 RIH to 5795' filling pipe every 2000'. 9 Cut 120' & slip 60' drilling line. Adjust brakes service top drive. 6 Continue RIH from 5795' to 12075' filling DP every 20000. $ Circulate bottoms up. 6 RIH from 12075' to 17321' filling pipe every 2000'. Took weight at 17321'. 3 Wash & ream thru tight spot at 17321'. Continue precautionary wash & ream to bottom while adding Glydril GP to mud system. Hole packed off at 17695' while reaming - took 30 rain to clear up problem. 10 Take base line ECD & check surveys with Anadrill tools. 3 Wash & ream from 18598' to 18620' adding Glydril at 5% & weighting up to 10.4 ppg. 2 Drill 8 %" hole from 18620' to 20082' (TVD 7195') 550 gpm, 2800 psi, 95-110 rpm, 10-17k WOB. Back ream before connection. Drill 8 %" hole from 20082' to 20641' (TVD 7336'). Circulate & work pipe while repairing mud pump #1. Drill 8 %" hole from 20641' to 21284' (7541'TVD). Drop in return flow & pump pressure. Trouble shoot pumps. Determined isolation valve washed out on #2 pump. Circulate to clean up hole before shutting down to repair isolation valve. Repair isolation valve in pump room. Circulate with pump #1 at 420 gpm while repairing discharge module washed out behind valve seat. Circulate at 2184' with 420 gpm & 120 rpm. Reciprocate pipe while replacing fluid end module on pump #2. Circulate with 420 gpm & 100 rpm. Set back stands every % hour, POOH to 20700' while repairing pump #2. Circulate with 340 gpm, rotate & run in stands at % hour intervals to 20900'. Continue in the hole to 2127' using both pumps. Drill 8 %" hole from 21284' to 21464' (7575'TVD) Pump HiVis sweep at 560 gpm, 2660 psi & 120 rpm. Reciprocate pipe until sweep out of hole & shakers cleaning up. POOH - had to back ream. Back ream from 21464' to 20078' at 120 rpm & 550 gpm. Back ream out of hole slowly, working tight hole from 20630' to 20078' with 420 gpm & 110 rpm. 3 Back ream out from 20078' to 19910' at 30 minlstd. Circulation rate 420 gpm, rotating at 120 rpm. Hole Packed off. 3 Worked to regain circulation - unable to pump above 150 gpm without packing off. Worked pipe from 19910' to 19614' - unable to work down without packing off. 3 Establish full rate with pumps. Circulate bottoms up at a pump rate of 550 gpm & pump pressure of 2570 psi. Worked pipe from 19614' to 19707' with a rotary speed of 120 rpm. After bottom up hole continued to pack off. Back reamed out from 19614' to 19315'-hole packed off intermittently throughout. 3 Circulate bottoms up while back reaming from 19315' to 19200'. Circulate at 550 gpm & a pump pressure of 2550 psi - hole conditions improving. 3 Back ream from 19200' to 18125' at 20-30 minlstd, circulating at 550 gpm & rotating at 120 rpm. 6 POOH from 18125' to 17206' - pUlled 40-OOk lbs over pull. 3 Back ream & work thru tight spot at 17206', circulating at 550 gpm & rotating at 120 rpm. 6 POOH from 17150' to 15880' - pulled 40-60k lbs over pull. 3 Back ream tight spots from 16880' to 15830', circulating at 550 gpm & rotating at 120 rpm. Phillips Alaska Inc. - CD2-33 (Alpine West) Daily Operations (I.A.D.C.) Time Elapsed Code (hrs) Time 1430-1800 3.50 6 1800-2000 2.00 3 2000-2200 2.00 3 2200-2216 0.25 6 2215-2400 1.75 3 oe~o3~2001 0000.0215 2.25 3 02164)230 0.26 6 02304)400 1.50 3 04004)430 0.50 0430-0600 0,50 3 05004)630 1.50 8 0630-1400 7.60 3 1400-1415 0.26 6 1416-1930 6.26 3 1930-2030 1.00 $ 2030-2300 2.50 6 2300-2400 1.00 6 08104/2001 00004)200 2.00 6 02004)400 2.00 7 04004)600 2.00 8 0600-1000 4,00 6 1000-1100 1.00 10 1100-1230 1 .lil) 1 1230-2300 10.50 6 2300-2400 1.00 08/0~2001 00004)230 2.60 6 02304)430 2.00 6 0430-0600 1.60 17 06004)700 1.00 6 07004)900 2.00 6 0900-1016 1.26 17 1016-1200 1.76 6 1200-1230 0.50 6 1230-1800 5.50 6 1800-1930 1.50 1930-2000 0.50 $ 2000~100 1.00 17 2100~130 0.50 6 2130~200 0.50 5 2200~400 2.00 6 Operations Breakdown POOH from 15830' to 14880' - pulled 40-75k lbs over pull. Pulled into tight spot at 14880' & jarred pipe free down after 16 min. Back reamed from 14900' to 18840', circulating at 550 gpm & rotating at 120 rpm over a 30 min period. POOH from 14840' to 14600' - pulled 40-76k lbs over pull. Hit tight spot at 14600' & jarred down for 40 min before it came free. Back ream from 14600' to 14510'.. Hit fight spot at 14510' - jarred down & pipe came free. Back ream from 14510' to 14433' circulating at 550 gpm, rotating at 120 rpm with a pump pressure of 2010 psi. Back ream from 14433' to 13879'. Attempt to POOH - could not pass 13788' with 50k lbs over pull because of sticky hole. Back ream from 13879' to 13217'. Back ream from 13217' to 12261' at 1000-2000 fph. Slowed to 200 fph between 12700' to 12680' due to string over pull & torque. Circulation rate 560 gpm, standpipe pressure 2000 psi rotating at 120 rpm. Attempt to pull pipe - could not pass thru 12200' with fi0k lbs over pull. Back ream from 12261 to 11672' at a pump rate of 660 gpm, standpipe pressure 1990 psi rotating at 120 rpm. Pipe stuck at 11672' -jarred down to free pipe. Back ream from 11672 to 11696' at a pump rate of 660 gpm, standpipe pressure 1990 psi rotating at 120 rpm. Unable to break out stand with top drive. Circulate & reciprocate pipe while repairing top drive reverse contactors in SCR. Back ream from 11595' to 8644' at a pump rate of 550 gpm, standpipe pressure 1900 psi rotating at t26 rpm. POOH from 8450' to shoe. Over pull gradually increased to 45k lbs for last 40' pulled. Back ream from 11595' to 8644' at a pump rate of 650 gpm, standpipe pressure 1800 psi rotating at 125 rpm, Pumped 40 bbl t2.4 ppg HiVis sweep. POOH to BHA with no problems. Stand back HWDP & jars. Remove source from LWD. Finish removing source from LWD tools, POOH & lay down MWDILWD, mud motor & bit, Perform preventive maintenance on top drive, Disassemble & repair torque wrench on top drive. Pick up 2256' of 3 ½" DP stinger & mule shoe, RIH to 5777'. Slip & cut 80' drilling line. Install shims on guide dolly rollers to align top drive more over hole. RIH with 3 ~/2" DP stinger on 5" DP. Wash & ream 56' to bottom. Pump 40 bbl weighted HiVis pill, Circulate .& condition mud/hole prior to setting P&A plug #1. Pump 40 bbl weighted HiVis pill. Circulate & condition mud/hole prior to setting P&A plug #1. Wiper trip 10 stands to check hole condition before cementing. PJSM. Rig up & pressure test cement lines. Pump & set P&A cement plug #1 from 21454' to 20790'. (47.7 bbls at 15.8 ppg, 'G" cement). POOH to top of plug #1. Circulate & condition mud at 20790'. Pump at $50 gpm, with a pump pressure of 2820 psi & rotating at 70 rpm. Rig up & pressure test cement lines. Pump & set a P&A cement plug #2 from 20883' to 20340' with 62 bbls of 15.8 ppg cement. Displaced cement to equalization. POOH to 19025'. Circulate to clean DP. Monitor well - static. Pump DryJob. POOH from 19026' to 6535'. Circulate bottoms up. Pump 60 bbls of 13.0 ppg HiVis pill. Displace to equalization. POOH to 6250'. Circulate & condition mud for cementing. Plug back 8 ½" open hole & 9 $18" casing from 6250' with 490 sks of 17.0 ppg cement slurry. Displaced cement to equalization. POOH slowly to 5077'. Circulate bottoms up. Dumped 45 bbls of cement contaminated mud. POOH laying down 5" DP. Location: AJp~e DRILUNG seRwces Operator: ~hi~l~s'-~ Show RepoA Repo~ Prepar~ By: - ~yne Repo~ Delivered To: ~?~ ?emer % Depth 7067 fl Gas Units 268 Mud Chlorides (ppm) = Fiowiine Background Show ppm ppm ppm Cl 25517 2675 = 22~2 C2 1488 151 = I335 C3 683 32 = 651 C4 402 I6 = 388 C5 181 10 = 151 Production Cl/C2= 17.1 Ct/C3= 35,I C1/C4= 59.2 Cl/05= 151.3 Non-Producible Hydrocarbons % Depth 7t12 ft Gas Units 377 Mud Chlorides (ppm) = ppm ppm ppm C1 5fl~E ~ 675 = C2 3886 5 ¢ = 3735 C3 2223 3-2 = 2! C4 1337 18 = !g2t C5 725 !0 = 715 Production Hydrocarbon Ratios 0t/C2= 6 ~ Cl/C3= ',04 Ct/C4= !77 C1/C5= 319 Depth (MD) 7~0 to 7150 ft (TVD) 3894- to 3913 ft Show Report No, Date/Time: 19-Ju~-01 Hydrocarbon Ratios C1 C1 C1 Ct C2 C3 C4 C5 1000.0 NPH 100.0 10.0 NPH 1.0 a. Productive d~/gas zones ma5, show only C I? but abr orma y: gh CI on} shows are usually indicative of salt water b. [l'fl}e C l/C2 ratio falls low in the oil section, with Ihe C t/C4 ratio high in the gas section, the zone is probably non-productiYe c. If any ratio (C t/C5 excepted if oil mad is used) is lower than a preceding ratio the zone is erobabty non-productive. The F!ixlerplot!ndicates a gas zg~e f9r t~*¢ fl~)~_]~ ~(J the 5econdpeak ~[gts as~ !ighte[~[de oi! zone: Samples !r~!~!~ ?!at ~e se~gnd zone ha~ ~od resep¢oirqua.!ities~ therefore th~ ~e~on~[ ~ ~a~ ~een ~ated as . fa!r fo~' oi! D[odaction: I SHOW EVALUATION: good pale yellow cut fluorescence. Non-Producible Hydrocarbons I m.o oG¥: $-a[~ds[°ne:cieart°transtucent'whi!e:?[yfi[!e!°,fi-neg,rained'm°derately Evalnate section for probable production as ~p w~ll s?~d, sub angular to sub round, f[ia~ ~[c~[e~u~ cem?t ie paR, indicated by the plotted curve within the following: predominan~y unconsolidated, moderately bright yellow/goM fluorescence, S pe~y~s u ~1 WetIN .... CD2-3~ Location:P~pk~e DRILLING SERVICES Operator: Ph~s Show Repo~ Repo~ Prepared By: Wayne Report Delivered To: Meg Kremer % Depth 7843 ff Gas Units 539 Mud Chlorides (ppm) = 700 Ftowtine Background Show ppm ppm pp~ Hydrocar~n Ratios C1 44296 4216 = 48080 C1/C2 = 18.4 C2 2377 203 : 2174 C1/C3 = 33.2 C3 t278 72 = t208 C1/C4 C4 5~ 21 : 575 Cl/C5 = 183.0 C5 227 8 = 2~9 Produc~on Non-Producible Hydrocarbons Depth 7812 R Gas dn~s 128 Mud Chlorides (ppm) = 7~;;0 Gas Fiowiine Background Show I 0.0 ppm ppm ppm Hydrocarbon Ratios C2 5824 203 = ¢881 Cl/C3= 10f5 C3 3;40 7~ = 37fi~ CIIC4= NPH C4 2"9 2~ = 20fl8 C1/C5= 48~ t.0 05 88 a = Producdon 1000.0 NPH Depth (MD) 7830 to 7850 ft (TVD) 4028 to 4081 ft Show Report No.2 Date/Time: I Hydrocarbon Ratios C1 C1 C1 C1 C2 C3 C4 C5 100.0 a, Productive dr5.' gas zones may show only C 1. but abnormally high C 1 only shows are nsttalt5 indicative of salt water b. tf file C 1/C2 ratio falls Iow ia the oil section, with the C1/C4 ratio high in the gas section, the zone is probably' non-proc nc i',re c. If an5' ratio (C l/C5 excepted if oil mhd is nsod) is lower than a preceding ratio, the zone is probabl3 non-prodacti~e. _Th~ Ri×!e(p!9~ !~{!~A~S ~ 9~s_ ~ne ¢0(the ~[s~ p~a~ apd the segond peak ~¢5 i~i?ate ~?~e ~EPE~ ~99P )~ rel~ty ~2od resewoir qualities ~nd oil was observed at the shaker, ~erefore ~e second zone has . been rated as fair to good for oil production. I SHOW EVALUATION: dull to moderately bright gold fluorescence, fast yellow gold cut fluorescence. oil observed at the shaker. Non-Producible Hydrocarbons j UTHOLOGY: 1 Sandstone: clear to translucent, white, trace light brown to tan, very fine Evaluate section fur probable production as omir~ed, su~?ngular to sub [ound, well sorted, predominatety clay matrix, indicated by the plotted curve within the following: trace very friable, calcareous cement, predominatety quartz, trace chert, Location: Atpine DRILLING SERVICES Operator: Ph~ps Als~ka ~c, Show Repo~ Repo~ P~epared By: Wayne Henmans0n Repo~ Delivered To: Meg Kremer % Depth 2084_~ ft Gas Unffs 2320 Mud Chlorides (ppm) = 4¢.p0_ Flowtine Background Show ppm ppm ppm C1 133189 7854 = 425565 C2 15460 543 = '149I 7 C3 14646 480 = 14163 C4 6503 375 = 8128 C5 2203 t40 = 2063 Production Hydrocarbon Ratios C1/C2 = 8.4 C1/C3 = 8.9 C1/C4 = 28.5 C1/C5 = 60,9 1000,0 NPH t00~0 Producible Hydrocarbons Chlorides (ppm) = 46 Gas Flowtine Background Show 10,0 ppm ppm ppm Hydrocarbon Ratios C2 754{~ 53 = ?03 CI/C3 C4 3396 375 = 302! C1/C5 = 99~} 1.0 05 !400 140 = Production Analysis: Non-Producible Hydrocarbons Depth (MD) 20620 to 20730 (TVD) 7347 to 7379 Show Report No, Date/Tkne: 30 duF01 Hydrocarbon Ratios c1 c1 c1 c1 c2 c3 c4 c5 c. If any ratio (C t/C5 excepted if oil mud is used) is lox~er thm~ a preceding ratio, the zone is probably non-producti~ e The Pixler plot indicates an oil ~gn~ fg(~he. fi~'s~ peak and the second peak plots as a !ightersideoil Z?~z ~d~!n~ toward{ ~as Tt)efluorescence and cut_ exhibitedby the samples indic~!e~ ~ha~ this isan oil zone. Slightly t!ght. ~!~ ~?e ~as been rated as fair to good f~r ail ISHOW EVALUATION: lose, quadz grains, 'Lace glauconite grains, siliceous cement, silty matrix in part, 35% bright yellow/gold/white fluorescence, stow pale milky white cut fluorescence. b. If d~e C I/C2 ratio falls tow in the oil sectioo, w/th the C I/C4 ratio higk in the gas section, the zone is probably non-productive a. Prodactive dr3 gas zones may show only C k but abnom~all5 high C I onb sho*~s are usually indicattye of satt water. [ LITHOLOGY: ] ~a_nd~n_~:tan to light b~own, clear to .opaque, ver¥~n?!0m~diumg[air~ed, gva~uate section for probable production as ~[~d!p~ !o ~i~, ~p~rt medium grained. Sub r0?d ~e ~'?ad, modera?~ sorted, indicated by the plotted crave within the following: occasionally poorly sorted, brown oil stain on cuttings, fdable to occasionally % Depth 20856_fi Gas Units 279~ Mud Chlorides (ppm) = 400 Fiowiino Background Show ppm ppm pprn Hydrocarbon Ratios C1 161400 14215 = 147185 C1/C2 = 7.8 C2 20532 I65I = 1888t C1tC3 = 7.5 C3 21720 2093 = 19687 C1/C4 = 16,3 C4 10118 I094 = 9024 C1/C5 = 48.8 C5 3830 487 = 3143 Production Flowiine Background Show ppm ppm ppm Hydrocarbon Ratios C1 5 "~ 57{; 14215 = ~3736' C1/C2 = 74 C2 21471 1551 = 19820 Cl/C3 = 74 C3 21841 2033 = 'gag9 Cl/C4 = 5{; C4 10533 1094 = 9439 C1/C5 = 44.0 C5 3835 487 = 3348 Producfloa [ UTHOLOGY: 1000.0 NPH 100.0 Hydrocarbon Ratios c1 c1 Cl c1 c2 c3 c4 c5 10.0 oil NPB t.0 on the lighter side. c. If an}' ratio (C 1/C5 excepted ifoil mud is used) is Taking into account the magnitude of the show, relatively good fluorescence and cut. These zones have been rated as good to excellent for oil production. lox~ er than a preceding ratio, the zone is probably non-producti* e The pixler pl0t indi?t~s an oil ~o~e for th~ ~0~ ~¢aks. ~il appears to be SHOW EVALUATION: slightly calcareous, calcareous cement, some siliceous cement, 85% quaC~z, 15% lithic fragments and 2% glauconite, light brown stain, silty matrix in parr, 40-50% bright to dull yellow/gold fluorescence, fair to good moderately fast b. If the C 1/C2 ratio fhlls lox,, in the oil section, xdth the C t/C4 ratio high il~ the gas section, the zone is probably' con-productive a. Prodective d0, g[Is zoties may show only C I. but abnormally high C 1 only shows are usually indicatix'e o~' salt water Sandstone: light tan to tan, ctear totranstucentLveryfia~to fine grai~,¢om~e Evaluate section for probable production as medium grained, angular to sub angular, moderately fdabte to very friable, indicated by the plotted curve within the following: II II I I I I I II I I I I II I I I I I /-,} s:per~-Su'n:~ WELL NAME: CD2-33 LOCATION: Alpine · fl~ ~/ LOGGING SERVICES ~~w-4 ' BI T :'R E CO R D OPERATOR: PhillipsAlaska )LAC. A_R~A: Colville River CONTRACTOR: Doyon 19 STATE: Alaska ~ , Bit Bit Bit Bit Bit JETS Depth Hours Feet Avg. w-O.B R.P.M. gpm Pump T B G Reas Pul REMARKS Run # Make Type Size Out Dfld R.O.P.! Pres. I 0 D L B O 0 R 1 1' ";HTC MXCl 12.25 10-12-12-18 3228 21.60 3114 144.2 10/30 150i200 544 1650 3 7 WT H E 1 SS PR DireclJor~al'ddll ' 2 2 HTC MXCl 12.25 10-12-12-18 583822.60 2610 115.5 15/35 175/240 628 2600 1 2 SS A E I ER TD ,Diredionalddll , , - 3 STC 12.25 '" 5838 ' Clean out with hole opener .... 3 4 HTC 'MXC1 8.25 5x15 18620 116'.5012782 109.7 15/20 1201130 563 " 2330 0 1EC A D 1 :CT BHADirectionaldfillwithAutoTrack -4 5 Hyca DS70 8.25 6x15 21464 25.50 2844 111.5 18/22 120/131 550.0 2900 0 3 RO S D I [WTTD Conventionai directional assembly i , i · i ,,, . ,. . · i_ . . , , ............. , ..... ............. , , ,, , ,, i ., ...... ............. , ...... Mud Properties for Alpine Well CD2-33 as reported M-i Mud Engineer From (feet)(feet) : (ppg) sec/cC600 300 200 100 6 3 cP Ibll00'210s 10m 30m AP! HTHP:APIHTHF %byvolume (ppb) (Pm)! mg/I mg/I Pit 07/28/01 04:00 18621 6799 9.9 40 31 25 22 19 9 8 6 19 8 10 i2 4.2 9.2 1 2 8.00 3.00189.00 0.10 13.8 8.4 0.10 0.05/0.50 400 40 Rt 07/28/01 08:00 18621 6799 9.9 40 32 25 22 19 9 8 7 18 9 10 13 4 9.4 1 2 8.00 3.001 89.00 tr 13.8 8.4 0.05 0.05/0.40 400 40 __ Pit 07/28/01 15:00 18621 6799 9.9 41 38 31 26 22 11 10 7 24 10 12 13 4 10.0 1 2 8.50 3.50 88.00 tr 13.8 9.6 0.40 0.0411.20 400 40 Pit 07/28/01 23:59 18621 6799 10.4 40 36 28 25 20 9 8 8 20 9 11 13 3.4 9.0 1 2 10,00 5.00 85.0010.10 12.8 9.2 0.15 0.10/0.45 400 40 ., Pit 07/29/01 03:00 18844 6857 10.4 39 35 27 24 19 9 8 8 19 8 10 13 3.4 9.0 1 2 10,00 5,00,85.00 0.10 12.5 9.0 1.00 0,08/0.48 400 40 Suction 07/29/01 07:30 19063 6905 10.4 40 39 30 26 21 11 9 9 21 9 11 13 3.4 8.9 1 2 10,00 6.00:84.00 tr 12.5 9.2 0.50 0.20/1.20 400 40 ,. Suction 07/29/01 14:00 19520 7023 10.4 40 40 31 28 23 10 9 9 22 10 12 13 3.0 8.0 1 2 10.00 5.00 85.00 tr 13.8 9.2 0.40 0.20/1.20 400 40 Pit 07/29/01 23:00 20028! 6857 10.4 40 37 30 26 21 10 9 7 23 9 12 13 2.8 8.0 1 2 10.00~ 9,00 81.00 0,10 13.8 9.0 0.12 0.05/O.60 400 40~ Pit 07/30101 04:00 20269 7248 10.4 40 36 29 25 20 9 8 7 22 8 12 13 3.0~ 8.4 1 2 10.00 8.00 82.00 0,10 15.0 9.2 0.14 0.08/0.60 400 40! Suction 07/30/01 08:30 20539 7322 10.4 42 40 31 28 22 10 9 9 22 10 12 14 3.2 8.4 1 2 10.00 6.00 84.00 tr 16.3 9.2 0.20 0.10/1.20 400 40 Suction 07/30/01 15:00 20885 7424~ 10,4 38 38 30 26 20 9 8 8 22 9 11 13 3.2 8.2 1 2 10.00 6.00 84.00 tr 16.0 9,2 0.20 0.10/1.20 400 40 ..__ Pit 07/30/01 23:00 21284 7524 10,4 40 35 28 24 19 9 8 7 21 8 11 13 3.0 8.0 1 2 10.50 8.00 81.50 0.15 16.0 9.1 0.14 0.08/0.78 400 40 Pit 07/31/01 04:00 21284 7524 10.4 40 37 29 25 20 9 8 8 21 8 12 14 3.0 8.0;I 2 10.00 8.00 82.00 0.10 t5,0 9.2 0.14!0.10/0.75 400 40 SUction 07/31/01 10:00 21464 7596 10.4 39 37 29 25 20 9 8 8 21 8 11 12 3.0 8.0 1 2 10.00 8.00 82.00 tr 15,0 9,4!0,15'0.10/1.20 400 40 SUction 07/31/01 14:00 21464 7596 10.4 38 38 29 25 20 9 8 9 20 9 11 12 3.2 8.0 1 2 10,00 8.00 82,00 tr 15.0 9.2 0,10 0.10/1.40 400 40 ' Pit 07/31/01 22:05 21464 7596 10.4 39 36 28 24 19 9 8 8 20 8 11 12 3.4 7.2 1 2 10.00 8.00 82.00 0.15 15.0 9.2 0,15 0,10/1.20 400 40 Pit 08101/01 03:23 19847 7147 10.4 40 39 30 26 21 10 8 9 21 10 12 13 3.2 7,6 1 2 10.50 '8.00 82.00 0.10! 15.0 9.2 0.10 0.10/1,20 "400 40 Suction 08101/01 08:00 21464 7596 10.4 39 39 30 25 20 9 8 9 21 8 10 12 3.2 8,0 1 2 10.00 8.00 82.00 tr 15.0 9,1 0.10 0.10/1,20 400 40 Suction 08/01/01 15:00 21464 7596 10.5 43 39 30 25 20 10 8 9 21 7 12 14 3.0 8.8 1 2 10,50 8.00 82.00!tr 17.3 8.9 0.10 0,10/0,80 400 40 -- Pit 08/01/01 22:00 21464 7596 10,4 42 35 26 22 18 9 8 9 17 8 10 12 3.1 8.4 1 2 11.00 7.00i82.00 0.10 16,3 9.1 0.10 0.10/1,00 400 40 Pit 08/02/01 03:10 21464 7596 10.4 42 38 29 26 21 10 8 9 20 10 12 14 3.2 7,2 1 2 11.00 7.00 82.00 tr 17.5 9,0 0.10 0.20il.30 400 .... 40' Pit 08/02/01 09:00 21464 7596 10,4 40 38 25 22 18 8 6 7 18 7 9 tl 3.2 7.8 1 2 10.50 6,00 84.00 tr 17,5 9.5 0.15 0.10/1.40 400 40 Pit 08/02/01 16:00 21464 7596 10,4 42 37 28 24 21 10 8 9 19 9 11 13 3,5 7,4 I 2 10.501 6.00 84,00 tr 17,5 9,2 0,10 0.10/1.20 400 40 Pit :08/02/01 23:00 21464 7596 10.4 42 38 28 25 20 9 8 10 18 9 12 13 4.4 8.5 1 2 11,00 5.00 85,00 tr 17.5 9.0 0.10 0.15/1.30 400 40 , Pit 08103101 02:30 21464 7596: 10.4 41 38 29 26 21 10 8 9 20 10 12 13 3.6 7.8 1 2 10.00 3.00 87.00 tr 17.0 9.0 0,15 0.15/1.30 300 601 Pit 08/03/01 09:00 21464 7596 10.4 40 37 28 25 20 9 7 9 19 9 11 12 3.5 7.6 1 2 10,00 3.00 87.00 tr 17,5 9.0 0.10 0.05/1,40 300 60 , , Pit 08/03/01 15:15 21464 7596 10.4 43 44 35 31 26 12 10 9 26 12 14 16 3.6 8.4!1 2 10.00 3.00 87.00 tr 17.5 8,8 0.10 0.05/1.50 300 40 Pit 08/03/01 22:00 21464 7596 10.4 42 43 34 31 26 11 10 9 25 11 13 16 3.5 7.0' 1 2 10,00 3.00 87.00 tr 17.0 8.9 0.10 0.10/1,40 400 "'(~0 , , Pit 08/04/01 03:00 21464 7596 10.4 42 43 34 31 26 11 10 9 25 11 13 15 3.5 7,0 1 2 10.00 3.00 87.00 tr 17.0 9.0 0.1010.10/1.40 400 60 Pit 08/04/01 12:00 21464 7596 10.5 44 42 33 30 25 11 10 9 24 12 14 15 3,4 7.4 1 2 10.00 3.00 87.00 tr 17.5 8.8 0.50 0.05/1,60 350 40 Pit 08/04/01 22:00 21464 7596 10.4 42 42 33 30 25 11 10 9 24 12 14 15 3.4 7.4 1 2 10.00 3.00 87,00 tr 17.5 9.0'0.t0 0.10/1.50 350 40 , , Pit 08/05/01 03:00 21464 7596 10.4 42 42 33 29 24 11 9 9 24 11 14 15 3,4 7.6 1 2 11.00 2.00 87.00 tr 17.5 8.7 0,05 0.05/1.00 400 60 Pit 08/05/01 10:00 21464 7596 10.4 43 43 34 30 26 12 10 9 25 11 15 16 3.2 7.6 1 2 11.00 2.00 87.00 tr 17.5 8.8 0.05 0.05/1.10 350 60 Pit 08/05/01 15:00 21464 7596 10.4 41 38 30 26 21 10 8 9 22 9 14 15 3,2 7.4 1 2 1t.00 2.00 87.00 tr 17,5 8.5 0.01 0,01/1.50 400 80 ,, ~ Pit 08/05/01 22:30 21464 7596 10,4 42 41 32 28 23 10 8 9 23 10 14 16 3.2 7.6 1 2 11.00 2,00 87.00 tr 17.5 9.2 0,10 0.15/1,60 400 120 ANADRILL SCHLUMBERGER Survey report Client ................... : Phillips Alaska Inc. Field .................... : Coville River Well ..................... : CD2-33 API number ............... : 50-103-20381-00 Engineer ................. : Dammeyer COUNTY: .................. : Doyon 19 STATE: ................... : Alaska Survey calculation methods Method for positions ..... : Minimum curvature Method for DLS ........... : Mason & Taylor Depth reference ................. Permanent datum .......... : MEAN SEA LEVEL Depth reference .......... : Drill Floor GL above permanent ....... : 15.90 ft KB above permanent ....... : DF above permanent ....... : 52.05 ft Vertical section origin Latitude (+N/S-) ......... : Departure (+E/W-) ........ : 0.00 ft 0.00 ft Platform reference point Latitude (+N/S-) ......... : -999.25 ft Departure (+E/W-) ........ : -999.25 ft Azimuth from rotary table to target: 248.30 degrees 31-Jul-2001 13:56:22 Page 1 of 9 Ail surveys are IFRR corrected by Sperry Sun Surveys from 5895-18576 ft provided by BHI Spud date ................ : 07-Jun-2001 Last survey date ......... : 31-Jul-01 Total accepted surveys...: 229 MD of first survey ....... : 0.00 ft MD of last survey ........ : 21464.00 ft Geomagnetic data Magnetic model ........... : BGGM version 2000 Magnetic date ............ : 07-Jul-2001 Magnetic field strength..: 1147.17 HCNT Magnetic dec (+E/W-) ..... : 25.34 degrees Magnetic dip ............. : 80.54 degrees FfWD survey Reference Criteria Reference G .............. : 1002 68 mGal Reference H .............. : 1147 17 HCNT Reference Dip ............ : 80 54 degrees Tolerance of G ........... : (+/-) 2 50 mGal Tolerance of H ........... : (+/-) 6 00 HCNT Tolerance of Dip ......... : (+/-) 0 45 degrees Corrections Magnetic dec (+E/W-) ..... : 25.34 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) .... : 25.34 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N) ........ : No degree: 0.00 [(c)2001 Anadrill IDEAL ID6_iC_08] ANADRILL SCHLUMBERGER Survey Report 31-Jul-2001 13:56:22 Page 2 of 9 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 1 0.00 0.00 0.00 2 114.00 0.00 0.00 3 225.00 0.23 137.62 4 319.00 0.32 168.89 5 411.00 0.78 227.06 6 501.00 2.18 241.69 7 591.00 3.44 234.82 8 683.00 4.67 249.99 9 766.00 5.05 257.79 10 856.00 6.33 259.49 11 945.40 6.69 258.18 12 1034.00 6.39 258.78 13 1129.00 8.07 258.46 14 1223.00 9.35 256.53 15 1320.00 10.50 257.59 16 1414.00 13.19 257.58 17 1510.00 15.63 254.25 18 1604.00 17.47 248.07 19 1699.00 19.56 246.91 20 1795.00 21.95 247.39 21 1890.00 24.85 245.97 22 1985.00 27.10 246.77 23 2080.00 29.40 248.50 24 2175.00 31.59 251.60 25 2269.00 33.29 251.05 26 2363.00 35.39 251.83 27 2460.00 38.12 250.28 28 2555.00 41.28 246.82 29 2650.00 44.01 246.17 30 2744.00 46.50 244.34 0.00 114.00 111.00 94.00 92.00 90.00 90 00 92.00 83.00 90 00 89.40 88 60 95.00 94.00 97 00 94.00 96 00 94.00 95.00 96 00 95.00 95.00 95.00 95.00 94.00 94.00 97.00 95.00 95.00 94.00 TVD vertical Displ Displ Total At depth section +N/S- +E/W- displ Azim (ft) (ft) (ft) (ft) (ft) (deg) 0.00 0.00 0.00 114.00 0.00 0.00 225.00 -0.08 -0.16 319.00 -0.10 -0.56 410.99 0.53 -1.24 500.96 2.81 -2.47 590.85 7.13 -4.84 682.62 13.56 -7.71 765.33 20.54 -9.64 854.88 29.31 -11.38 943.70 1031.73 1125.97 1218.88 1314.43 39.28 -13.35 49.21 -15.36 60.97 -17.73 75.03 -20.82 91.55 -24.56 1406.42 110.59 -28.71 1499.39 134.27 -34.57 1589.50 160.97 -43.28 1679.58 191.13 -54.85 1769.34 225.15 -68.05 1856.52 1941.92 2025.60 2107.46 2186.79 2264.40 2342.11 2415.21 2485.08 2551.25 262.85 -83.01 304.43 -99.67 349.39 -116.76 397.56 -133.16 447.91 -149.31 500.85 -166.18 558.82 -185.04 619.47 -207.28 683.79 -232.95 750.45 -260.91 0.00 0.00 0.15 0.33 -0.08 -2.04 -5.75 -11.53 -18.27 -27.02 -36.96 -46.85 -58.57 -72.46 -88.76 0.00 0.00 0.00 0.00 0.22 137.62 0.65 149.72 1.24 183.74 3.20 219.51 7.51 229.93 13.87 236.22 20.66 242.19 29.32 247.16 39.30 250.15 49.31 251.85 61.20 253.16 75.40 253.97 92.09 254.53 -107.60 111.36 255.06 -130.75 135.24 255.19 -156.03 161.92 254.50 -183.89 191.89 253.39 -215.24 225.74 252.46 -249.87 263.29 251.62 -287.99 304.75 250.91 -329.57 349.64 250.49 -374.89 397.83 250.45 -422.65 448.25 250.54 -472.92 -527.80 -584.23 -643.24 -703.86 501.27 250.64 559.30 250.68 619.91 250.47 684.13 250.09 750.66 249.66 DLS (deg/ i00f) 0.00 0.00 0.21 0.18 0.73 1.60 1.45 1.76 0.92 1.43 0.44 0.35 1.77 1.40 1.20 2.86 2.68 2.71 2.23 2.50 3.11 2.40 2.57 2.84 1.84 2.28 2.97 4.06 2.91 2.99 Srvy tool type TIP MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD M-WD M-WD MWD MWD MWD MWD MWD MWD Tool qual type -- -- -- -- -- [(c)2001 Anadrill IDEAL ID6_lC_08] ANADRILL SCHLUMBERGER Survey Report 31-Jul-2001 13:56:22 Page 3 of 9 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 31 2841.00 49.88 243.17 32 2937.00 53.48 245.17 33 3032.00 54.98 247.49 34 3128.00 57.93 247.70 35 3221.00 60.51 248.04 36 3316.00 62.99 248.74 37 3410.00 66.33 249.74 38 3508.00 67.44 250.08 39 3602.00 69.73 249.35 40 3696.00 72.02 249.37 41 3794.00 73.58 249.62 42 3889.00 74.27 250.29 43 3984.00 74.75 249.62 44 4076.00 75.10 248.83 45 4171.00 75.65 248.30 46 4267.00 76.00 247.43 47 4361.00 75.85 248.62 48 4457.00 75.16 248.38 49 4551.30 74.53 248.32 50 4647.00 73.95 248.05 51 4743.00 73.18 247.69 52 4839.00 73.71 247.22 53 4933.00 74.48 247.83 54 5027.00 74.94 249.66 55 5123.00 75.05 249.20 56 5219.00 75.07 249.52 57 5314.00 75.22 250.07 58 5410.00 75.02 250.01 59 5504.00 74.77 251.14 60 5600.00 75.40 249.67 97.00 96.00 95.00 96.00 93.00 95.00 94.00 98.00 94.00 94.00 98.00 95.00 95.00 92.00 95.00 96.00 94 00 96.00 94.30 95 7O 96.00 96 00 94.00 94.00 96 00 96.00 95 00 96.00 94.00 96 00 TVD Vertical Displ Displ Total At DLS depth section +N/S- +E/W- displ Azim (deg (ft) (ft) (ft) (ft) (ft) (deg) i00f 2615.91 2675.42 2730.96 2784.00 2831.59 2876.55 2916.78 2955.25 2989.57 3020.36 3049.34 3075.65 3101.02 3124.95 3148.93 3172.44 3195.30 3219.33 3243.99 3269.98 3297.14 3324.49 3350.25 3375.04 3399.90 3424.65 3449.00 3473.66 3498.15 3522.86 822.51 -292.90 -768.68 897.61 -325.68 -836.47 974.64 -356.60 -907.06 1054.63 -387.09 -981.03 1134.52 -417.19 -1055.04 1218.20 1303.13 1393.23 1480.70 1569.49 -448.00 -1132.83 -478.10 -1212.27 -509.06 -1296.91 -539.40 -1378.99 -570.70 -1462.09 1663.09 1754.33 1845.84 1934.67 2026.59 -603.49 -1549.78 -634.78 -1635.53 -666.16 -1721.53 -697.67 -1804.59 -731.26 -1890.15 2119.66 2210.83 2303.78 2394.80 2486.90 -766.33 -1976.37 -800.45 -2060.92 -834.51 -2147.40 -868.10 -2232.00 -902.32 -2317.50 2578.97 -937.01 -2402.80 2670.98 -972.29 -2487.78 2761.37 -1006.85 -2571.32 2852.04 -1039.71 -2655.82 2944.75 -1072.29 -2742.63 3037.49 -1104.99 -2829.44 3129.28 -1136.70 -2915.61 3222.02 -1168.37 -3002.82 3312.70 -1198.56 -3088.40 3405.40 -1229.67 -3175.79 822.59 897.64 974.64 1054.64 1134.53 Srvy Tool / tool qual ) type type 1218.20 1303.14 1393.24 1480.73 1569.53 249.14 3.60 MWD 248.73 4.09 MWD 248.54 2.53 MWD 248.47 3.08 MWD 248.42 2.79 MWD 1663.13 1754.40 1845.93 1934.76 2026.68 248.42 2.69 MWD 248.48 3.68 MWD 248.57 1.18 MWD 248.64 2.54 MWD 248.68 2.44 MWD 2119.74 2210.91 2303.85 2394.87 2486.97 248.72 1.61 MWD 248.79 0.99 MWD 248.85 0.85 MWD 248.86 0.91 MWD 248.85 0.79 MWD 2579.03 2671.03 2761.42 2852.08 2944.80 248.81 0.95 MWD 248.77 1.24 MWD 248.76 0.76 MWD 248.75 0.67 MWD 248.73 0.66 MWD 3037.55 3129.36 3222.11 3312.82 3405.54 248.70 0.88 MWD 248.65 0.72 MWD 248.62 1.03 MWD 248.62 1.94 MWD 248.65 0.48 MWD 248.67 0.32 MWD 248.70 0.58 MWD 248.74 0.22 MWD 248.79 1.19 MWD 248.83 1.62 MWD [(c)2001 Anadrill IDEAL ID6_iC_08] ANADRILL SCHLUMBERGER Survey Report 31-Jul-2001 13:56:22 Page 4 of 9 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) TVD depth (ft) 61 5694.00 75.94 250.16 94.00 3546.13 62 5777.00 76.14 250.68 83.00 3566.15 63 5895.00 75.56 251.27 118.00 3595.00 64 5991.00 73.11 252.03 96.00 3620.92 65 6086.00 73.42 252.85 95.00 3648.27 66 6181.00 73.58 252.65 67 6277.00 73.65 252.69 68 6372.00 74.10 253.18 69 6467.00 74.03 251.28 70 6562.00 75.24 250.06 95.00 96.00 95.00 95.00 95.00 95.00 96.00 94.00 95.00 96.00 71 6657.00 76.06 248.23 72 6753.00 76.51 247.76 73 6847.00 77.20 248.07 74 6942.00 77.51 248.35 75 7038.00 77.86 248.24 3675.25 3702.33 3728.72 3754.80 3779.98 3803.52 3826.28 3847.66 3868.46 3888.93 76 7133.00 77.14 247.47 95.00 3909.49 77 7228.00 75.97 246.89 95.00 3931.58 78 7323.00 75.94 247.03 95.00 3954.64 79 7418.00 76.19 247.83 95.00 3977.52 80 7513.00 76.13 246.79 95.00 4000.24 81 7608.00 76.13 246.21 95.00 4023.02 82 7703.00 75.97 245.37 95.00 4045.92 83 7798.00 75.97 245.74 95.00 4068.95 84 7894.00 76.16 246.04 96.00 4092.07 85 7989.00 76.22 245.92 95.00 4114.74 94.00 95.00 95.00 95.00 95.00 86 8083.00 76.16 246.05 87 8178.00 76.13 245.94 88 8273.00 76.10 245.48 89 8368.00 75.84 244.69 90 8463.00 75.52 244.74 4137.18 4159.93 4182.73 4205.76 4229.26 Vertical Displ Displ section +N/S- +E/W- (ft) (ft) (ft) 3496.44 -1260.94 -3261.33 3576.93 -1287.94 -3337.22 3691.22 -1325.24 -3445.39 3783.49 -1354.34 -3533.11 3874.23 -1381.78 -3619.85 3965.04 -1408.80 -3706.84 4056.88 -1436.23 -3794.76 4147.84 -1463.01 -3882.00 4238.97 -1490.89 -3968.99 4330.49 -1521.21 -4055.43 4422.51 -1553.98 -4141.43 4515.77 -1588.92 -4227.89 4607.31 -1623.34 -4312.71 4700.00 -1657.75 -4398.79 4793.79 -1692.43 -4485.93 4886.54 -1727.39 -4571.83 4978.91 -1763.23 -4657.00 5071.05 -1799.30 -4741.81 5163.24 -1834.68 -4826.95 5255.47 -1870.27 -4912.05 5347.65 -1907.04 -4996.63 5439.76 -1944.85 -5080.72 5531.82 -1982.99 -5164.62 5624.91 -2021.05 -5249.67 5717.09 -2058.60 -5333.93 5808.30 -2095.75 -5417.31 5900.46 -2133.28 -5501.57 5992.59 -2171.21 -5585.63 6084.61 -2210.04 -5669.22 6176.48 -2249.36 -5752.45 Total At DLS Srvy Tool displ Azim (deg/ tool qual (ft) (deg) 100f) type type 3496.60 3577.12 3691.47 3783.80 3874.61 3965.52 4057.46 4148.54 4239.77 4331.35 4423.38 4516.61 4608.12 4700.79 4794.57 4887.28 4979.62 5071.70 5163.86 5256.05 5348.19 5440.23 5532.23 5625.27 5717.40 5808.57 5900.69 5992.78 6084.76 6176.59 248.86 0.76 248.90 0.65 248.96 0.69 249.03 2.66 249.11 0.89 249.19 0.26 249.27 0.08 249.35 0.69 249.41 1.92 249.44 1.78 249.43 2.06 249.40 0.67 249.37 0.80 249.35 0.43 249.33 0.38 249.30 1.10 249.26 1.37 249.22 0.15 249.19 0.86 249.16 1.06 249.11 0.59 249.05 0.87 249.00 0.38 248.94 0.36 248.90 0.14 248.85 0.15 248.81 0.12 248.76 0.47 248.70 0.85 248.64 0.34 MWD MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M [(C)2001 Anadrill IDEAL ID6_1C_08] ANADRILL SCHLUMBERGER Survey Report 31-Jul-2001 13:56:22 Page 5 of 9 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 91 8558.00 75.62 245.46 92 8653.00 75.57 245.36 93 8749.00 75.68 246.63 94 8844.00 75.59 247.34 95 8940.00 75.78 247.22 96 9035.00 75.46 247.96 97 9130.00 75.59 248.88 98 9225.00 75.24 248.29 99 9320.00 75.31 249.04 100 9415.00 75.53 249.42 101 9511.00 75.65 248.76 102 9606.00 75.62 249.62 103 9701.00 75.49 248.08 104 9796.00 75.46 247.01 105 9891.00 75.44 246.30 106 9986.00 75.46 246.57 107 10081.00 75.59 246.68 108 10177.00 75.46 246.41 109 10272.00 75.53 246.38 110 10368.00 75.49 246.64 111 10463.00 75.41 247.57 112 10558.00 75.40 247.38 113 10654.00 75.50 247.27 114 10749.00 75.46 247.80 115 10843.00 75.17 247.77 116 10939.00 75.40 247.66 117 11034.00 75.31 247.65 118 11129.00 75.31 248.16 119 11224.00 75.52 248.87 120 11319.00 75.59 249.22 95.00 95.00 96.00 95.00 96.00 95.00 95.00 95.00 95.00 95.00 96.00 95.00 95.00 95.00 95.00 95.00 95.00 96.00 95.00 96.00 95.00 95.00 96.00 95.00 94.00 96.00 95.00 95.00 95.00 95.00 TVD depth (ft) 4252.93 4276.57 4300.40 4323.97 4347.71 4371.30 4395.05 4418.97 4443.12 4467.03 4490.92 4514.49 4538.19 4562.02 4585.88 4609.75 4633.50 ' 4657.49 4681.29 4705.31 4729.17 4753.11 4777.23 4801.05 4824.88 4849.26 4873.28 4897.37 4921.30 4944.99 Vertical section (ft) 6268 6360 6453 6545 6638 Displ Displ +N/S- +E/W- (ft) (ft) .34 -2288.09 -5835.90 .23 -2326.38 -5919.57 .15 -2364.21 -6004.52 .16 -2400.19 -6089.22 .16 -2436.12 -6175.02 6730 6822 6914 7005 7097 .18 -2471.20 -6260.09 .16 -2505.03 -6345.63 .10 -2538.60 -6431.22 .97 -2572.03 -6516.80 .90 -2604.63 -6602.77 7190 7282 7374 7466 7558 .87 -2637.82 -6689.62 · 89 -2670.51 -6775.65 .88 -2703.70 -6861.45 .83 -2738.83 -6946.44 .75 -2775.27 -7030.86 7650 7742 7835 7927 8020 .65 -2812.03 -7115.15 .60 -2848.52 -7199.58 .51 -2885.52 -7284.85 .43 -2922.35 -7369.13 .33 -2959.40 -7454.37 8112 8204 8297 8389 8479 .26 -2995.17 -7539.08 .18 -3030.39 -7624.00 .09 -3066.21 -7709.74 .05 -3101.35 -7794.73 .98 -3135.73 -7878.91 8572 8664 8756 8848 8940 .82 -3170.94 -7964.82 .73 -3205.88 -8049.83 .62 -3240.45 -8134.98 .56 -3274.12 -8220.53 .55 -3307.02 -8306.44 Total At DLS Srvy Tool displ Azim (deg/ tool qual (ft) (deg) I00f) type type 6268.42 248.59 0.74 6360.29 248.55 0.11 6453.19 248.51 1.29 6545.19 248.49 0.73 6638.19 248.47 0.23 6730.20 6822.18 6914.12 7006.00 7097.93 MWD_M MWD_M MWD_M MWD_M 7190.91 7282.93 7374.92 7466.87 7558.78 248.46 0.83 MWD_M 248.46 0.95 MWD_M 248.46 0.70 MWD_M 248.46 0.77 MWD_M 248.47 0.45 MWD_M 7650.67 7742.61 7835.52 7927.43 8020.33 248.48 0.68 MWD_M 248.49 0.88 MWD_M 248.49 1.58 MWD_M 248.48 1.09 MWD_M 248.46 0.72 MWD_M 8112.26 8204.19 8297.09 8389.05 8479.98 248 . 44 0.28 MWD_M 248 . 41 0.18 MWD_M 248.39 0.30 MWD_M 248 . 37 0.08 MWD_M 248 . 35 0.27 MWD_M 248.33 0.95 MWD_M 248.32 0.19 MWD_M 248.31 0.15 MWD_M 248.30 0.54 MWD_M 248.30 0.31 MWD_M 8572.82 248.29 0.26 8664.73 248.28 0.10 8756.62 248.28 0.52 8848.56 248.28 0.76 8940.55 248.29 0.36 MWD_M MWD_M MWD_M [(c)2001 Anadrill IDEAL ID6_iC_08] ANADRILL SCHLUMBERGER Survey Report 31-Jul-2001 13:56:22 Page 6 of 9 Seq Measured Incl Azimuth Course TVD # depth angle angle length depth - (ft) (deg) (deg) (ft) (ft) 121 11414.00 75.53 249.26 122 11510.00 75.18 248.87 123 11605.00 75.34 249.71 124 11700.00 75.46 251.32 125 11795.00 75.58 251.62 126 11890.00 75.49 250.82 127 11985.00 75.37 250.36 128 12080.00 75.40 249.00 129 12176.00 75.30 248.24 130 12271.00 75.43 248.29 131 12366.00 75.53 248.01 132 12461.00 75.59 248.03 133 12556.00 75.24 246.94 134 12652.00 75.27 247.82 135 12746.00 75.31 247.12 136 12842.00 75.24 247.40 137 12937.00 75.34 247.54 138 13033.00 75.21 247.43 139 13128.00 75.37 248.08 140 13223.00 75.21 248.13 141 13319.00 75.15 248.52 142 13414.00 75.36 249.76 143 13509.00 75.19 249.61 144 13604.00 75.24 250.25 145 13699.00 75.43 249.28 146 13794.00 75.21 248.36 147 13889.00 75.27 247.82 148 13984.00 75.18 247.81 149 14079.00 75.12 247.49 150 14174.00 75.21 247.98 95.00 96.00 95.00 95.00 95.00 95.00 95.00 95.00 96.00 95.00 95.00 95.00 95.00 96.00 94.00 96.00 95.00 96.00 95.O0 95.00 96.00 95.00 95.00 95.00 95.00 95.00 95.00 95.00 95.00 95.00 4968.68 4992.96 5017.13 5041.07 5064.83 5088.56 5112.46 5136.43 5160.71 5184.71 5208.53 5232.22 5256.14 5280.58 5304.45 5328.85 5352.97 5377.37 5401.50 5425.62 5450.17 5474.35 5498.50 5522.75 5546.80 5570.87 5595.08 5619.30 5643.65 5667.97 Vertical section (ft) 9032 9125 9217 9309 9400 Displ Displ +N/S- +E/W- (ft) (ft) .53 -3339.63 -8392.47 .41 -3372.82 -8479.22 .27 -3405.31 -8565.15 .13 -3435.97 -8651.82 .97 -3465.20 -8739.03 Total At DLS Srvy Tool displ Azim (deg/ tool qual (ft) (deg) I00f) type type 9032.53 248.30 0.08 MWD_M 9125.41 248.31 0.54 MWD_M 9217.27 248.32 0.87 MWD_M 9309.13 248.34 1.64 MWD_M 9400.97 248.37 0.33 MWD_M 9492 9584 9676 9769 9861 .84 -3494.82 -8826.12 .71 -3525.37 -8912.84 .60 -3557.30 -8999.04 .48 -3591.15 -9085.53 .40 -3625.19 -9170.91 9492.85 9584.73 9676.63 9769.51 9861.42 248.40 0.82 MWD_M 248.42 0.49 MWD_M 248.43 1.39 MWD_M 248.43 0.77 MWD_M 248.43 0.15 MWD_M 9953 10045 10137 10230 10321 .36 -3659.42 -9256.27 9953.39 .36 -3693.85 -9341.58 10045.38 .29 -3729.06 -9426.51 10137.31 .11 -3764.76 -9512.21 10230.13 .02 -3799.60 -9596.19 10321.04 248.43 0.30 MWD_M 248.43 0.07 MWD_M 248.42 1.17 MWD_M 248.41 0.89 MWD_M 248.40 0.72 MWD_M 10413 10505 10598 10690 10782 .85 -3835.49 -9681.82 10413.87 .73 -3870.70 -9766.69 10505.74 .57 -3906.25 -9852.46 10598.58 .45 -3941.04 -9937.51 10690.46 .33 -3975.30 -10022.77 10782.34 248.39 0.29 MWD_M 248.38 0.18 MWD_M 248.37 0.17 MWD_M 248.37 0.68 MWD_M 248.37 0.18 MWD_M 10875 10967 11058 11150 11242 .14 -4009.58 -10109.01 10875.15 .00 -4042.29 -10194.86 10967.01 .85 -4074.19 -10281.02 11058.87 .67 -4105.71 -10367.30 11150.69 .54 -4137.50 -10453.53 11242.56 248.37 0.40 MWD_M 248.37 1.28 MWD_M 248.38 0.24 MWD_M 248.40 0.65 MWD_M 248.41 1.01 MWD_M 11334.44 -4170.70 -10539.22 11334.46 11426.30 -4204.98 -10624.45 11426.32 11518.16 -4239.67 -10709.51 11518.18 11609.98 -4274.59 -10794.44 11610.00 11701.81 -4309.38 -10879.43 11701.82 248.41 0.97 MWD_M 248.41 0.55 MWD_M 248.40 0.10 MWD_M 248.40 0.33 MWD_M 248.39 0.51 MWD_M [(c)2001 Anadrill IDEAL ID6_1C_08] ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 151 14269.00 75.41 246.73 152 14364.00 75.27 246.51 153 14459.00 75.28 247.25 154 14555.00 75.18 247.17 155 14651.00 75.53 247.45 156 14745.00 75.56 247.68 157 14841.00 75.24 247.70 158 14936.00 75.37 248.18 159 15031.00 75.31 248.31 160 15126.00 75.15 248.77 161 15221.00 75.15 248.66 162 15317.00 75.34 249.45 163 15412.00 75.09 248.74 164 15507.00 75.43 248.87 165 15602.00 75.19 247.55 166 15698.00 75.05 246.53 167 15793.00 75.12 246.24 168 15888.00 75.31 245.78 169 15983.00 75.31 245.08 170 16078.00 75.08 245.73 171 16173.00 75.40 247.54 172 16269.00 75.12 246.73 173 16364.00 75.10 245.81 174 16459.00 75.12 246.51 175 16555.00 75.34 247.59 176 16650.00 75.37 248.20 177 16743.00 75.41 248.32 178 16837.00 75.31 248.66 179 16931.00 75.34 250.60 180 17024.00 ~75.28 249.42 95.00 95.00 95.00 96.00 96.00 94.00 96.00 95.00 95.00 95.00 95.00 96.00 95.00 95.00 95.00 96.00 95.00 95.00 95.00 95.00 95.00 96.00 95.00 95.00 96.00 95.00 93.00 94.00 94.00 93.00 TVD depth (ft) 5692.07 5716.11 5740.26 5764.73 5789.00 5812.47 5836.67 5860.76 5884.81 5909.03 5933.37 5957.82 5982.07 6006.24 6030.33 6054.98 6079.44 6103.68 6127.77 6152.04 6176.25 6200.68 6225.09 6249.50 6273.97 6297.99 6321.45 6345.21 6369.03 6392.61 31-Jul-2001 13:56:22 Page Vert sec (f 11793 11885 11977 12070 12163 ical Displ Displ Total tion +N/S- +E/W- displ t) (ft) (ft) (ft) .69 -4344.76 -10964.23 11793.70 .56 -4381.23 -11048.60 11885.57 .41 -4417.31 -11133.10 11977.41 .22 -4453.27 -11218.68 12070.22 .09 -4489.09 -11304.37 12163.09 At Azim (deg) 248.38 248.37 248.36 248.35 248.34 12254 12347 12438 12530 12622 .10 -4523.83 -11388.50 12254.10 .00 -4559.10 -11474.45 12347.00 .89 -4593.61 -11559.61 12438.89 .79 -4627.68 -11644.98 12530.80 .65 -4661.28 -11730.47 12622.66 248.34 248.33 248.33 248.33 248.33 12714.48 -4694.62 -11816.03 12714.48 12807.30 -4727.80 -11902.73 12807.31 12899.15 -4760.58 -11988.54 12899.15 12991.02 -4793.79 -12074.20 12991.02 13082.91 -4827.90 -12159.52 13082.92 248.33 248.34 248.34 248.35 248.34 13175 13267 13359 13450 13542 .67 -4864.10 -12244.95 13175.67 .42 -4900.87 -12329.06 13267.42 .20 -4938.22 -12412.98 13359.20 .98 -4976.43 -12496.56 13450.98 .71 -5014.65 -12580.07 13542.71 248.34 248.32 248.31 248.29 248.27 13634 13727 13819 13910 14003 .53 -5051.08 -12664.40 13634.53 .35 -5087.16 -12749.94 13727.35 .10 -5124.10 -12833.99 13819.11 .84 -5161.21 -12917.97 13910.86 .65 -5197.41 -13003.44 14003.66 248.26 248.25 248.24 248.22 248.21 14095.56 -5231.99 -13088.60 14095.58 14185.55 -5265.33 -13172.19 14185.57 14276.50 -5298.67 -13256.81 14276.51 14367.40 -5330.32 -13342.05 14367.42 14457.32 -5361.08 -13426.59 14457.33 248.21 248.21 248.21 248.22 248.23 7 of 9 DLS (deg/ i00f) 1.29 0.27 0.75 0.13 0.46 0.24 0.33 0.51 0.15 0.50 0.11 0.82 0.77 0.38 1.37 1.04 0.30 0.51 0.71 0.70 1.87 0.87 0.94 0.71 1.11 0.62 0.13 0.37 2.00 1.23 Srvy tool type MWD_M MWD_Fi MWD_M FIWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M M~D_M MWD_M MWD_M MWD_M MWD__M MWD_M MWD_M MWD_M MWD_M MWD__M MWD__M MWD__M MWD__M MWD__M MWD_M MWD_M MWD_M MWD_M MWD_M Too1 qual type [(c)2001 Anadrill IDEAL ID6_iC_08] ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 181 17117.00 75.18 248.98 182 17207.00 75.72 248.96 183 17300.00 75.22 249.11 184 17393.00 75.18 248.87 185 17486.00 75.18 248.76 186 17580.00 75.25 248.96 187 17674.00 75.22 249.27 188 17767.00 75.28 249.25 189 17859.00 75.28 248.90 190 17952.00 75.34 249.14 191 18045.00 75.25 248.79 192 18137.00 75.21 248.84 193 18230.00 75.22 250.17 194 18324.00 75.24 249.29 195 18417.00 75.28 249.63 196 18508.00 75.22 249.71 197 18576.00 75.12 249.81 198 18622.00 75.11 250.68 199 18715.89 74.92 250.42 200 18808.00 74.86 249.85 201 18901.00 74.80 250.23 202 18992.00 74.76 250.24 203 19086.00 74.55 250.12 204 19179.00 74.31 249.61 205 19273.00 74.13 249.42 206 19366.00 73.87 250.56 207 19458.00 73.87 250.31 208 19550.00 74.03 249.83 209 19643.00 74.01 249.49 210 19735.00 74.07 250.50 93.00 90.00 93.00 93.00 93.00 94.00 94.00 93.00 92.00 93.00 93.00 92.00 93.00 94.00 93.00 91.00 68.00 46.00 93.89 92.11 93.00 91.00 94.00 93.00 94.00 93.00 92.00 92.00 93.00 92.00 31-Jul-2001 13:56:22 TVD Vertical Displ Displ Total depth section +N/S- +E/W- displ (ft) (ft) (ft) (ft) (ft) 6416.32 6438.93 6462.26 6486.02 6509.81 6533.79 6557.75 6581.43 6604.81 6628.39 6652.00 6675.45 6699.19 6723.15 6746.81 6769.98 6787.39 6799.20 6823.48 6847.49 6871.83 6895.72 6920.59 6945.56 6971.12 6996.75 7022.31 7047.75 7073.35 7098.65 Page 14547 14634 14724 14814 14904 · 24 -5393.01 -13510.65 14547.24 .34 -5424.27 -13591.96 14634.35 .36 -5456.48 -13676.03 14724.37 .27 -5488.72 -13759.96 14814.27 .17 -5521.21 -13843.79 14904.17 At Azim (deg) 248.24 248.24 248.25 248.25 248.26 14995 15085 15175 15264 15354 .05 -5553.99 -13928.57 14995.06 .94 -5586.39 -14013.49 15085.94 .86 -5618.24 -14097.60 15175.86 .83 -5650.02 -14180.71 15264.84 .79 -5682.23 -14264.71 15354.79 248.26 248.27 248.27 248.28 248.28 15444 15533 15623 15714 15804 .73 -5714.52 -14348.66 15444.74 .69 -5746.66 -14431.61 15533.69 .59 -5778.15 -14515.84 15623.59 .45 -5809.64 -14601.10 15714.45 .38 -5841.19 -14685.32 15804.38 248.28 248.29 248.29 248.30 248.31 15892 15958 16002 16093 16182 .35 -5871.77 -14767.84 15892.35 .06 -5894.51 -14829.52 15958.07 .50 -5909.53 -14871.36 16002.50 .12 -5939.73 -14956.88 16093.13 .00 -5969.95 -15040.51 16182.01 248.32 248.32 248.33 248.34 248.35 16271 16359 16450 16539 16630 .72 -6000.59 -15124.88 16271.73 .48 -6030.28 -15207.52 16359.49 .08 -6061.02 -15292.79 16450.09 .63 -6091.86 -15376.91 16539.65 .07 -6123.52 -15461.64 16630.09 248.36 248.37 248.38 248.39 248.39 16719 16807 16896 16985 17073 .42 -6154.11 -15545.64 16719.45 .74 -6183.70 -15628.92 16807.77 .11 -6213.84 -15712.04 16896.15 .49 -6244.92 -15795.87 16985.54 .91 -6275.18 -15878.98 17073.96 248.40 248.41 248.42 248.43 248.44 8 of 9 DLS (deg/ 100f) 0.47 0.60 0.56 0.25 0.11 0.22 0.32 0.07 0.37 0.26 0.38 O.O7 1.38 0.91 0.36 0.11 0.20 1.83 0.34 0.60 0.40 0.05 0.26 0.59 0.27 1.21 0.26 0.53 0.35 1.06 Srvy tool type MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M MWD_M M-WD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD Tool c/ual type [(c)2001 Anadrill IDEAL ID6_1C_08] ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 211 19829.00 74.11 249.98 212 19922.00 73.88 250.25 213 20015.78 73.43 250.47 214 20109.00 73.32 250.18 215 20202.00 73.69 250.79 216 20295.00 73.57 250.05 217 20388.00 73.66 250.96 218 20481.00 73.66 250.53 219 20575.00 73.49 250.85 220 20669.00 73.39 251.04 221 20760.00 73.22 250.29 222 20852.00 73.17 250.48 223 20943.00 73.01 251.27 224 21036.00 72.90 250.89 225 21126.00 72.86 251.93 226 21218.00 72.63 250.43 227 21311.00 72.56 250.76 228 21397.00 72.17 251.03 229 21464.00 72.17 251.03 94.00 93.00 93.78 93.22 93.00 93.00 93.00 93.00 94.00 94.00 91.00 92.00 91.00 93.00 90.00 92.00 93.00 86.00 67.00 TVD depth (ft) 7124.42 7150.06 7176.45 7203.12 7229.53 7255.74 7281.98 7308.14 7334.72 7361.51 7387.65 7414.25 7440.72 7467.98 7494.48 7521.77 7549.59 7575.64 7596.15 31-Jul-2001 13:56:22 Vertical Displ Displ section +N/S- +E/W- (ft) (ft) (ft) 17164.25 -6305.74 -15964.06 17253.60 -6336.14 -16048.12 17343.53 -6366.39 -16132.88 17432.80 -6396.46 -16216.99 17521.91 -6426.25 -16301.04 17611.08 -6456.15 -16385.11 17700.23 -6485.93 -16469.21 17789.39 -6515.36 -16553.46 17879.48 -6545.17 -16638.56 17969.49 -6574.59 -16723.72 18056.58 -6603.45 -16805.97 18144.59 -6633.02 -16888.93 18231.57 -6661.54 -16971.19 18320.38 -6690.37 -17055.30 18406.26 -6717.79 -17136.82 18494.01 -6746.13 -17219.98 18582.68 -6775.62 -17303.69 18664.55 -6802.44 -17381.13 18728.26 -6823.17 -17441.45 Page Total displ (ft) At Azim (deg) 17164.31 17253.67 17343.61 17432.88 17522.00 17611.18 17700.35 17789.52 17879.62 17969.64 18056.75 18144.77 18231.77 18320.60 18406.51 18494.27 18582.96 18664.86 18728.58 248.45 248.45 248.46 248.47 248.48 248.49 248.50 248.52 248.53 248.54 248.55 248.56 248.57 248.58 248.59 248.61 248.62 248.63 248.63 9 of 9 DLS (deg/ I00f) 0.53 0.37 0.53 0.32 0.74 0.77 0.94 0.44 0.37 0.22 0.81 0.21 0.85 0.41 1.11 1.58 0.35 0.54 0.00 Srvy tool type MWD M-WD MWD MWD MWD MWD MWD MWD MWD MWD MWD FiWD MWD MWD M-WD MWD MWD MWD MWD Tool qual type Projected [(c)2001 Anadrill IDEAL ID6_iC_08]