Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-124 Imag~'' 'roject Well History' File Cover ~ ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~_~_O _L- 1 ~.~ L~. Well History File Identifier Organizing ido,,~! [] RESCAN ~ Color items: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: DIGITAL DATA [] Diskettes, No. [] Other, No/Type BY: BEVERLY ROBIN VINCENT SHERY~WINDY OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) J Logs of various kinds [] Other DATE: /SI lJ~/l '¢ Project Proofing BY: BEVERLY ROBIN VINCENT SHERY~INDY Scanning Preparation ]~- x 30= !c~O BY: BEVERLY ROBIN VINCENT SHERYL~INDY Production Scanning Stage I PAGE COUNT FROM SCANNED FILE: ~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: .,~ YES Stage 2 IF NO IN STAGE t, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) NO NO RESCANNEDB+(: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY General Notes or Comments about this file: DATE: IS/ Quality Checked 12110/02Rev3NOTScanned.wpd e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _ Inserts\Microfilm _Marker. doc Permit to Drill 2011240 DATA SUBMITTAL COMPLIANCE REPORT 8~25~2003 Well Name/No. COLVlLLE RIV UNIT CD2-33A Operator CONOCOPHILLIPS ALASKA INC APl No. 50-103-20381-01-00 MD 15355 .~ TVD 7523 Completion Dat 8/15/2001 Completion Statu P&A Current Status P&A UIC N REQUIRED INFORMATION Mud Log N._9o Sample No Directional Survey DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type ..Media Fmt Name -~.1~ C Ne Neutron T (data taken from Logs Portion of Master Well Data Maint) Interval Log Log Run OH / Dataset Scale Media No Start Stop CH Received Number Comments 2 100 15355 Open 10405/.~... 100 15355 Open 9/28/2001 10346/'100-15355 Directional Survey FINAL oh 9/24/2001 Directional Survey FINAL 100 15355 OH 9/28/2001 10346 100-15355 Digital Data ~'Resistivity 2/5 FINAL 114 15355 OH 9/28/2001 114-15355 BL, Sepia q3Cb Density Neutron 2/5 FINAL 5824 15355 OH 9/28/2001 5824-15355 BL, Sepia · -.3~D Resistivity 2/5 FINAL 114 15355 OH 9/28/2001 114-15355 BL, Sepia --MD Density Neutron 2/5 FINAL 5824 15355 OH 9/28/2001 5824-15355 BL, Sepia Well Cores/Samples Information: Interval Dataset Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y/~1 Daily History Received? ~/N Chips Received? "?"-FN-~ Formation Tops ~)/N Analysis Comments: Permit to Drill 2011240 MD 15355 'I-VD 7523 Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 8~25~2003 Well Name/No. COLVlLLE RIV UNIT CD2-33A Operator CONOCOPHILLIPS ALASKA INC APl No. 50-103-20381-01-00 Completion Statu P&A Current Status P&A UIC N Date: ~lpifl~ k.,~r,l~T~t lop I-ill Subject: Alpine Cement Top Fill Date: Wed, 23 Apr 2003 17:38:26 -0800 From: "Jerry C Dethlefs" <Jerry. C.Dethlefs@conocophillips.com> To: Tom Maunder <tom_maunder@admin.state.ak.us> CC: "n1617" <n1617@conocophillips.com> Tom: Attached is a letter and spreadsheet with the data mentioned in the previous email. Thanks for the relief on all the Sundry's! Let me know if you need additional information. Jerry Dethlefs Problem Well Supervisor ConocoPhillips Alaska(See attached file: AOGCC ALPINE cement top outs 04-16-03.xls)(See attached file: Cement Top Fill AOGCC Letter 04-23-03.doc) Tom Maunder <tom_maunder@admin.state.ak.us> 04/23/2003 12:51 PM To: Jerry C Dethlefs/PPCO@Phillips cc: Subject: Re: Sundry's for topping off cement Hi Jerry, I agree Jerry that individual 404's aren't necessary. Send a "global document" with the information you list. There should also be some sort of introduction that describes why you did what you did and how you did it. Tom Jerry C Dethlefs wrote: > Tom: Last week we had a cement crew go down the line at Alpine, top filling > the conductors with cement. I believe 34 wells were treated. Chuck Scheve > and John Crisp were notified but declined to witness when we told them what > we were doing. Some time past we had agreed to submit a 10-404 for this > kind of work. Due to the number of these, is a 10-404 needed on each well? > I don't want to commit the time to doing this if it is not necessary; > 10-404's are time consuming to prepare. Would a list of the jobs suffice, > or something similar? We have the well numbers, depth to cement top, and > sacks used to fill the void. My proposal would not affect future > submissions of 10-404's for this work. What do you think? Thanks! > Jerry Dethlefs (See attached file: tom_maunder.vcf) 1 of 2 4/24/2003 7:55 AM  Name: AOGCC ALPINE cement top outs 04-16-03.xls'l AOGCC ALPINE cement top outs 04-16-03.xls Type: EXCEL File (application/msexcel) I ~--~Cement Top Fill AOGCC Letter 04-23-03.doc Name: Cement Top Fill AOGCC Letter 04-23-03.doc Type: WlNWORD File (application/msword) Encoding: base64 Tom Maunder <tom maunder.~,admin.state.ak, us> Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 2 of 2 4/24/2003 7:55 AM ConocOPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 23, 2003 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Mr. Maunder: Enclosed please find a spreadsheet with a list of wells from the Alpine field (CRU). Each of these wells was found to have a void in the conductor by surface casing annulus. The voids were filled with cement to the top of the conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place. In the fall of 2002, CD 1-23 was reported to have a "wobbly" tree. The top of cement was measured at 15- feet below the top of the conductor. Plans were made to stabilize the wellhead by top-filling cement later in the winter when the ice road to Alpine had been installed. Since that is considerable effort and expense for pumping a small load of cement, a survey was made of each conductor to see if voids were present. A list of 34 wells was put together that would need additional cement. The top-fill operation was started on April 15th and was completed on April 16th, 2003. Dowell- Schlumberger batch-mixed Arctic Set I cement to 15.7 ppg in a blender. The cement was pumped via high-pressure hose into the conductor. The cement was brought to the top of conductor on each well. The blender/pump and hose worked down the line, filling the identified wells until the list was completed. The attached spreadsheet presents the well name, top of cement depth prior to filling, and the number of sacks used on each conductor. Please call MJ Loveland or Nina Woods at 907-659-7224, or me at 659-7043 if you have any questions. Sincerely, Jerry Dethlefs ConocoPhillips Problem Well Supervisor Attachment ConocoPhillips Alaska, Inc. Surface Casing by Conductor Annulus Cement Top-Off Alpine Field, CD-1 CD-2 WELLS DEPTH VOLUME TYPE SACKS -- BBLS Cement -. CD1-1 2.25' 0.3 WI 1.8 CD1-2 4' 0.6 WI 3.6 ...... CD1-3 10' 1.4 MI 8.5 CD1-4 7.33' 1 P 6.0 CD1-5 4' 0.6 MI 3.6 .__ CDl16 10.42' 1.4 Gl 8.5 CD1-16 14.33' 2 WI 12.1 CD1-17 8.75' 1.2 P 7.2 ' 'CD1-21 13' 1,8 MI ..... 10.9 CD1-22 1.83' 0.3 P 1.8 CD1-23 15.42' 2.1 MI 12.7 -- CD1-24 2' 0.3 P 1.8 CD1-25 5.66' 0.8 P 4.8 , , CD1-27 18.83' 2.6 P 15.7 CD1-28 6.75' 1 P 6.0 CD1-32 8.33' 1.2 P 7.2 CD1-34 41.83' 5.7 P 34.4 CD1-36 16.75' 2.3 WI 13.9 CD1-38 3.5' 0.5 P 3.0 CD1-42 5.83' 0.8 MI 4.8 CD2-16 11.66' 1.6 INJ 9.7 CD2-17 18' 2.5 INJ 15.1 CD2-19 11.66' 1.6 P 9.7 CD2-22 13.5' 1.8 INJ 10.9 CD2-25 27.25' 3.7 P 22.3 CD2-26 10.42' 1.4 INJ 8.5 CD2-32 8.5' 1.2 INJ 7.2 CD2-33 ,,'- 7' 1 P 6.0 CD2-34 4' 0.6 P 3.6 CD2-41 11.83' 1.6 P 9.7 CD2-46 7.42' 1 INJ 6.0 CD2-48 10.33' 1.4 INJ 8.5 CD2-49 9.33' 1.3 INJ 7.8 CD2-50 1.66' 0.25 P 1.5 Record Of Shipment Of Confidential Information District: Alaska To: AOGCC Anchorage, AK 99501 / CC Attn: Steve Davies From: Phillips Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Attn: Jeanne L. Haas (907) 263-4470 ( x ) Enclosed ( )Under separate cover ()Via .... Subject: Quantity 1 log 1 log 1 log 1 log Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services 1 report 1 report 1 log 1 log 1 log 1 log Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Sperry-Sun Drilling Services Description Rig Monitoring TVD log dated 8-14-01 for well CD2-33 Rig Monitoring MD log dated 8-14-01 for well CD2-33 Rig Monitoring TVD log dated 8-15-01 for well CD2-33A Rig Monitoring MD log dated 8-15-01 for well CD2-33A End of Well Report for Alpine CD2-33A End of Well Report for Alpine CD2-33 /c~ O Rig Monitoring TVD log dated 9-11-01 for well CD2-39 PH Rig Monitoring MD log dated 9-11-01 for well CD2-39 PH Rig Monitoring MD log dated 9-10-01 for well CD2-39 PH Rig Monitoring TVD log dated 9-10-01 for well CD2-39 PH Note - Please verify and acknowledge receipt by signing and returning this transmittal or faxing it. Fax number 265-1515 Signed by Jeanne L. Haas Date Date 11/15/01 Remarks: NOV 1 5 2001 /~Jaska 0il & Gas Cons. Commission Ancl~rage 1 O~24~01 Schlumberger Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1556 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Alpine Color Well Job # Log Description Date BL Sepia Prints CD CD2-39~DJ_/~C~: ~ 21426 ARC,IMP & DIN (PDC) 09/t7/01 1 _ CD2-39~ 21426 VISION RESISTIVITY 09/17101 CD2-39 21426 VISION DEN/NEUTRON 09117101 1 CD2-33A (REDO) 21395 CDR & DIN (PDC) 08113101 .. ·., DATE: RECEIVED uu~ ]? 6 LUVI Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) $61~i1~ (~~1~$. Commission Anchorage Schlumberger Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 1488 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Alpine · 09/27/01 Color Well Job # Log Description Date BL Sepia Prints CD CD2-33A 21395 M10,CDR,N/D (PDC) 08113/01 1 CD2-33A 21395 CDR RESISTIVITY MD 08113/01 I 1 CD2-33A 21395 CDR RESISTIVITY TVD 08/t3/01 t 1 CD2-33A 21395 VISION DIN MD 08/13/01 I 1 CD2-33A 21395 VISION DIN TVD 08/13101 I 1 CD2-39 PB1 21400 N/D & ARC (PDC) 09109101 1 CD2-39 PB1 21400 VISION RESISTIVITY MD 09/09101 1 1 CD2-39 PB1 21400 VISION RESISTIVITY TVD 09109101 1 CD2-39 PB1 21400 VISION DIN MD 09109/01 1 CD2-39 PB1 21400 VISION DIN TVD 09/09101 1 1 CD2-24 PBt 21322 PROCESSED DSl 06115101 1 Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-83t7. Thank you. & L, OCAT!OH REPORT Sta~a cf k!ask~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil r~ Gas D Suspended [~ Abandoned r~] Service D '~' 2. Name of Operator~lt=:lm,'~ 7. Permit Number Phillips Alaska, Inc. . ¥~ 201-124 3. Address ~d~'"r"w' -, 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 ]~. I~l~ ? 50-103-20381-01 --,,-,{~ 1-r ~r'-''~'~ 4. Location of well at surface 9. Unit or Lease Name 1894' FNL, 1523' FEL, Sec. 2, T11N, R4E, UM (ASP: 371715, 5974463) " /,~ Colville River Unit At Top Producing Interval .... 10. Well Number 1493' FSL, 94' FEL, Sec. 9, T11N, R4E, UM (ASP: 362471,5967453) '..~.$/5'-,.~:~... 092-33 A 1185' FSL, 373' FEL, Sec. 9, T11N, R4E, UM (ASP: 362187, 5967151)~;,,'~) Colville River Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Alpine Oil Pool RKB 36.8' feetI ADL388905/ASRCNPRA02 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. of Completions August 6, 2001 August 13, 2001 August 15, 2001 P&A'dI N/A feetMSL 0 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 15355' MD / 7523' TVD 5726' MD / 3554' TVD YES [~] No DI N/A feet MD 1 60O' MD 22. Type Electric or Other Logs Run GR/Res/Neut/Dens 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 16" 62.5# H-40 Surface 117' 42" Pre-installed 9.625" 40# L-80 Surface 5824' 12.25" 924 sx AS III Lite, 1200 sx Class G P&A plug from 15349' - 14684' cement retainer set at 5726' 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) N/A N/A N/A N/A 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 15349' - 14684' Plug #1: 56.2 bbls 15.8 ppg Class G 5726' cement retainer 115 sx 15.8 ppg Class G 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) N/A Abandoned Date o1' Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO I Test Period > Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) 24-Hour Rate > 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. -~ , ~', ~,~.~,.~, ~;.~.,,~,~' N/A Alaska Oil & Gas Cons. Cor~issio~ Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE ! L,,/-~ I L Submit in d. uplicate GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity. MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. CD2-33 Top Alpine D 14852' 7333' Top Alpine 14907' 7355' Base Alpine 15125' 7440' RECEIVED 0CT 1 ? Alaska 0il & Gas Cons. Commissi0[~ Anchorage 31. LIST OF ATTACHMENTS Summary of Daily Operations, Directional Survey 32. I hereby certify that the following is true and correct to the best of my knowledge. Questions? Call Scott Reynolds 265-6253 Signed /~_~..~ ~.~ ~ Title Alpine Drillin,q Team Leader Date ~'O((~. (o ( Chip Alvord INSTRUCTIONS Prepared by Sharon Aflsup-Drake General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form10-407 DUPLICATE ,,  PHILLIPS ALASKA INC. Page 1 of 8 Operations Summa~ Report Legal Well Name: CD2-33 Common Well Name: CD2-338 Spud Date: 6/29/2001 Event Name: ROT- SIDETRACK Start: 8/1/2001 End: 9/1/2001 Contractor Name: doyonl @ ppco.com Rig Release: 9/1/2001 Group: i Rig Name: Doyon 19 Rig Number: 19 Sub Phase Description of Operations Date From - To Hours Code Code 8/6/2001 00:00- 05:30 5.50 DRILL PULD INTRM1 Laid down excess drill pipe. 05:30 - 06:00 0.50 WELCTL BOPE INTRM1 MU wash sub and flush BOP Stack. 06:00 - 08:30 2.50 RIGMNT RSRV INTRM1 Replace dies on grabber, change out swivel packing assembly and test to 3500 psi. 08:30 - 13:30 5.00 WELCTL BOPE INTRM1 Pull wear bushing and install test plug. Test annular preventor to :250/3500 psi. Test pipe rams, blind rams, choke and kill line valves, 'choke manifold, topdrive and floor safety valves to 250/5000 psi. Perform Accumulator test, pull test plug and install wear bushing. 13:30 - 15:30 2.00 DRILL PULD INTRM1 MU BHA #1, load source and shallow test tools @ 470'. 15:30 - 18:00 2.50 DRILL TRIP INTRM1 RIH, tagged cement @ 5780'. 18:00 - 19:00 1.00 DRILL ClRC INTRM1 Cleaned outcement to 5799' and CBU. 19:00 - 21:00 2.00 DRILL OTHR INTRM1 Cleaned out hard cement from 5799' to 5950'. 21:00 - 00:00 3.00 DRILL DRLG INTRM1 Sidetrack, Drill, & Survey 8-1/2" hole from 5950' to 6179' (3670' TVD). - .(Hole sidetracked and drilling new hole @ 5985'. AST = 1.53; ART = 1.81) 8/7/2001 00:00 - 04:30 4.50 DRILL DRLG INTRM1 Drill from 6179' to 6749', pumped high vis sweep @ 6484' (300+), observed 50% increase in returns at shakers when sweep came back, ECD before sweep 11.58 ppg, after 11.22 ppg. 04:30 - 05:00 0.50 RIGMNT RGRP INTRM1 Changed out block in Top Drive torque wrench after die dropped out of block. 05:00 - 00:00 19.00 DRILL DRLG INTRM1 Drill from 6749' to 8400'. Pumped sweeps every 500', alternated high vis (300+) and weighted (11.8ppg) averaged ECD reduction of 0.1 ppg-0.2 ppg, cuttings increased in returns varied from slight to 50% no torgue reduction observed from sweeps. 8/8/2001 00:00 - 12:15 12.25 DRILL ~DRLG INTRM1 Drill 8-1/2" hole from 8400' to 9605'. ART=7.8 AST=I.0 12:15 - 14:00 1.75 DRILL I CIRC INTRM1 CBU with 13 bpm, 1920 psi, 120 rpm & pumped 40 bbls wt high vis sweep (11.8 ppg, 280 vis) and circ hole clean. Had 50% increase in cuttings back with sweep. 14:00 - 15:30 1.50 DRILL WIPR INTRM1 Backreamed first 3 stands with 13 bpm, 120 rpm at 20 min/stand pump time. 15:30 - 16:15 0.75 DRILL WIPR INTRM1 POOH from 9224' to 8830', 25-35K over. Worked through tight hole from 8830' to 8770,' 35-50K over. 16:15 - 17:15 1.00 DRILL WIPR INTRM1 Backream from 8790' to 8557', 13 bpm 120 rpm @ 1000 fph. 17:15 - 19:30 2.25 DRILL WIPR INTRM1 POOH from 8557' to 8527' - hole pulling tight with 50K overpull. Back ream to 8177'. 19:30 - 21:00 1.50 DRILL WIPR INTRM1 POOH from 8177' to 7875' - hole pulling tight with 50K overpull. Back ream to 7511' - last 2 stands pulling at 1000 ft/hr. 21:00 - 22:30 1.50 DRILL WIPR INTRM1 POOH from 7511' to 9-5/8" csg shoe. Circ 150 bbls just below shoe prior to hanging off blocks. 22:30 - 23:30 1.00 RIGMNT RURD INTRM1 Slip & cut 90' of drilling line. 23:30- 00:00 0.50 RIGMNT RSRV INTRM1 Service top drive. 8/9/2001 00:00- 00:30 0.50 RIGMNT RSRV INTRM1 Complete PM on top drive. 00:30 - 03:30 3.00 DRILL TRIP INTRM1 RIH from surface csg shoe to TD. (Wash & ream 60' to bttm.) 03:30 - 00:00 20.50 DRILL DRLG INTRM1 Drill 8-1/2" hole from 9605' to 11406' (5887' TVD). (10.9 hrs ART; 1.2 hrs AST) (Had 350 units trip gas. Had 0.5 hrs down working pipe & circulating from 18:00 to 18:30 hrs when highLine power went down.) 8/10/2001 00:00 - 03:00 3.00 DRILL DRLG INTRM1 Drill from 11406' to 11682'. ART=2.2 AST=0 03:00 - 04:30 1.50 DRILL ClRC INTRM1 Pumped 40 bbls 11.7 ppg 150 vis sweep and circ 13 bpm w/1980 psi, 110 rpm, had 100% increase in cuttings at shaker when sweep came around, nutplug marker in sweep indicated minimal hole washout. 04:30 - 07:00 2.50 DRILL ClRC INTRM1 Continued to circ hole clean backreaming first 4 stands to 11318' at 30 min per stand. Monitor well, static. 07:00 - 09:00 2.00 DRILL WIPR INTRM1 POH to 11085' 10-20k over, attempted to work through tight hole @ Printed: 10/16/2001 8:48:36 AM  PHILLIPS ALASKA INC. Page 2 of 8 Operations Summa Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT - SIDETRACK Start: 8/1/2001 End: 9/1/2001 Contractor Name: doyonl @ppco.com Rig Release: 9/1/2001 Group: 'Rig Name: Doyon 19 Rig Number: 19 Sub, Date From. To Hours Code COde Phase Description of Operations 8/10/2001 07:00 - 09:00 2.00 DRILL WlPR INTRM1 11085', 50k over. Backreamed from 11126' to 10938' with 13 bpm 1820 psi, 100 rpm. (20' sand from 11000' to 10980'). 09:00 - 09:30 0.50 DRILL WlPR INTRM1 POH to 10585', 10-15k over, atempted to work through tight spot @ 10585' 50k over. Backreamed from 10652' to 10557' (40' sand from 10500' to 10460') 97' spacing bit/top stab. 09:30 - 10:45 1.25 DRILL WlPR INTRM1 Continued to wipe hole to 9129' 5-15k over, no other problems. 10:45 - 12:30 1.75 DRILL WIPR INTRM1 RIH, no problems, precautionary wash and read last 90'. 12:30 - 00:00 11.50 DRILL DRLG INTRM1 Drill from 11682' to 12428'. ART=6.1 AST=0.5 8/11/2001 00:00 - 04:00 4.00 DRILL DRLG INTRM1 Drill from 12428' to 12800' (6485' TVD). (1.7 hrs ART; 0.8 hrs AST) 04:00 - 05:30 1.50 RIGMNT OTHR INTRM1 . Rig lost highline power, troubleshoot, replaced resistor in ground fault Iccp, (Phillips equipment). 05:30 - 19:30 14.00 DRILL DRLG INTRM1 Drill from 12428' to 13727' (6864' TVD). (7.8 hrs ART; 0.4 hrs AST) 19:30 - 22:00 2.50 DRILL CIRC INTRM1 Circ & cond mud/hole prior to short trip. (Sweep hole with 40 bbls of 12.2 ppg high vis.) 22:00 - 23:30 1.50 DRILL WlPR INTRM1 Back ream CCH on wiper trip from 13727' to 13448'. 23:30 - 00:00 0.50 DRILL WlPR INTRM1 Continue POOH on wiper trip to 13311'. 8/12/2001 00:00 - 00:30 0.50 DRILL WlPR INTRM1 Continue POOH on wiper trip from 13311' to 13230'. (Unable to work through with 75k max overpull.) 00:30 - 02:00 1.50 DRILL WlPR INTRM1 Back ream and work pipe through a sand section from 13242' to 12985 (3 stands), at full drilling rate. 02:00 - 03:00 1.00 DRILL WlPR INTRM1 Continue POOH on wiper trip 11311' (18 stands). (No problems.) 03:00 - 05:00 2.00 DRILL WlPR INTRM1 Run back in hole and wash & ream 90' to bttm (26 stands). (No problems or fill.) 05:00 - 00:00 19.00 DRILL DRLG INTRM1 Drill 8-1/2" hole from 13727' to 14950', (7375' TVD). (10.8 hrs ART; 1.2 hrs AST) 8/13/2001 00:00 - 05:00 5.00 DRILL DRLG INTRM1 Drill from 14950' to 15355', TD. ART=3.2 05:00 - 07:45 2.75 DRILL CIRC INTRM1 Circ and cond mud, 13 bpm, 2440 psi, 120 rpm. 07:45 - 09:45 2.00 DRILL CIRC INTRM1 Stage out 3 stands, 11 bpm, 2180 psi, 110 rpm. 30 min/std pump on. (#2 pump down). 09:45 - 10:15 0.50 DRILL ITRIP INTRM1 Pump out 3 stands to 14840'. 4 bpm, 590 psi. 10:15 - 14:30 4.25 DRILL TRIP INTRM1 POH from 14840' to 9880', 10-20k over. 14:30 - 15:00 0.50 DRILL TRIP INTRM1 Work tight spot @ 9880' 50k over, backream from 9880' to 9860'. 15:00 - 17:00 2.00 DRILL TRIP INTRM1 POH from 9860' to 7505', backream tight spots from 9237' to 9192'. 17:00 - 21:00 4.00 DRILL TRIP INTRM1 POH from 7505' to shoe, backreamed tight spots from 7505' to 7287', 7190' to 7000', 6174' to 6139' with 12 bpm 70 rpm. 21:00 - 00:00 3.00 DRILL TRIP INTRM1 POH, stand back hwdp and I std. drill collars. 8/14/2001 00:00 - 01:00 1.00 DRILL TRIP INTRM1 Finish POOH & L/D BHA (LWD/MWD; stab; motor; bit). 01:00 - 04:30 3.50 CEMEN'] TRIP INTRM1 Clean rig floor. Hold PJSM. P/U mule shoe & 33 jts of 3-1/2" DP cmtg stinger. RIH with stinger on 5" DP to csg shoe. 04:30 - 05:30 1.00 RIGMNT RURD INTRM1 slip & cut drlg line. 05:30- 06:00 0.50 RIGMNT RSRV INTRM1 Service top drive. 06:00 - 11:00 5.00 CEMEN'] TRIP INTRM1 Continue RIH with cmtg stinger to TD at 15355'. 11:00 - 13:30 2.50 CEMEN'i CIRC INTRM1 Circ & cond mud/hole prior to setting P&A cmt plug. (Hold PJSM.) 13:30 - 14:30 1.00 CEMEN'I PLUG INTRM1 R/U cmt lines. Pressure test lines to 3000 psi. Mix & pump balanced P&A cmt plug from 15349' to 14684', (56.2 bbls of 15.8 ppg "G" cmt). (Top of Alpine Sand @ 14905'.) 14:30- 16:30 2.00 CEMEN'i TRIP INTRM1 POOH 1 single and 14 stands of 5" DPto 14016'. Circ string clear. Pump dry job. 16:30 - 19:30 3.00 CEMEN'i TRIP INTRM1 Continue POOH to 6996'. 19:30 - 21:30 2.00 CEMEN'I CIRC INTRM1 Pump 12.5 ppg hi vis sweep - rotate and recip, pipe @ 17 bpm - 110 rpm - pump dry job. 21:30 - 23:30 2.00 CEMEN'] TRIP INTRM1 Continue POOH f/6996' to 1041'. 23:30 - 00:00 0.50 CEMEN'~ TRIP INTRM1 Change elevators & ruffneck dies for 3 1/2" drill pipe. (Prepare to POOH Printed: 10/16/2001 8:4B:36 AM  PHILLIPS ALASKA INC. Page 3 of 8 Operations Summa~ Report Legal Well Name: CD2-33 Common Well Name: CD2-33B Spud Date: 6/29/2001 Event Name: ROT - SIDETRACK Start: 8/1/2001 End: 9/1/2001 Contractor Name: doyonl @ ppco.com Rig Release: 9/1/2001 Group: Rig Name: Doyon 19 Rig Number: 19 ~ Sub Phase Description of Operations Date From- To: Hours Code Code 8/14/2001 23:30 - 00:00 0.50 CEMEN-I'TRIP INTRM1 & L/D 3-1/2" DP stinger.) 8/15/2001 00:00 - 02:00 2.00 CEMEN'I'TRIP ABANDN Finish POOH w/3 1/2" drill pipe & mule shoe. 15:30 - 19:00 3.50; WELCTL BOPE INTRM1 (Operations moved from CD2-33A.) Pull wear bushing & run test plug. Test BOPE to PAl specs. (250psi/ 3500 psi on annular; 250 psi/5000 psi on rams, kill & choke line valves, floor valves, top drive IBOP's, and C&K manifold.) Pull test plug & run wear bushing. (John Crisp w/AOGCC waived witnessing the BOPE testing on Tuesday 14/Aug/2001 .) 02:00 - 06:30 4.50 CEMEN'] TRIP ABANDN M/U cmt retainer- RIH to 5728' on 5" drill pipe. 19:00 - 22:00 3.00 WINDOV 'PULD INTRM1 P/U bit, 9-5/8" csg scraper, full size string mill, bumper sub, 6-3/4" DC's, & 5" HWDP and RIH. 06:30 - 07:30 1.00 CEMEN'] SQEZ ABANDN Set retainer @ 5726' (top) - wt & pull test retainer to 40k - pressure test DP to 2500 psi - pressure test DP/csg annulus to 1000 psi. 22:00 - 00:00 2.00 WINDOV q'RIP INTRM1 Continue RIH with csg scraper assy to 3915'. (Prepare to work scraper over bridge plug setting depth and circ & cond mud.) 07:30 - 08:00 0.50 CEMEN~ SQEZ ABANDN Space out w/pup its. Make up cmt head. 08:00 - 09:00 1.00 CEMEN']' SQEZ ABANDN Test lines to 3000 psi - establish injection rate - 5 b/m @ 1100 psi - unsting f/retainer - pump 40 bbls water - mix & pump 23 bbls (115 sks) 15.8 ppg G cmt - followed by 6.5 bbls water - displace w/48 bbls mud - stab into retainer & squeeze 20 bbls water & 19.2 bbls cmt below reatainer - unsting f/retainer & dumped 3.8 bbl cmt on top of retainer - ClP @ 8:50 hrs. - rig down cmt lines. 09:00 - 09:30 0.50 CEMEN'I' TRIP ABANDN POOH from 5726' to 5240'. 09:30 - 10:00 0.50 CEMEN'r ClRC ABANDN Circulate drill pipe vol & bttms up - no cmt to surface. 10:00- 10:30 0.50 CEMEN'rTRIP ABANDN L/D pupjts.- pump dry job. 10:30 - 14:30 4.00 CEMEN'I' TRIP ABANDN POOH & L/D 165 jts. 5" drill pipe & retainer running tool 14:30 - 15:30 1.00 CASE DEQT ABANDN Pressure test retainer & 9 5/8" csaing to 1500 psi for 30 mins. - Release rig f/CD2-33A. John Crisp w/AOGCC waived witnessing the setting of the last P&A plug & pressure testing the csg & plug on Tuesday 14/Aug/2001. 8/16/2001 00:00- 03:30 3.50 WINDOV~CIRC INTRM1 Circ and condition mud 03:30 - 06:00 2.50 WINDOV~q'RIP INTRM1 POOH w/bit,scrpaer, and string mill - L/D bit, scraper, string mill 06:00 - 08:30 2.50 WINDOV~rrRIP INTRM1 PJSM - M/U bridge plug & RIH to 3876' 08:30 - 09:30 1.00 WINDOV~SETW INTRM1 Set bridge plug @ 3867' btm - 3865' top 09:30 - 11:30 2.00 WINDOV~q'RIP INTRM1 POOH w/drill pipe & setting tool ~ 11:30 - 16:00 4.50 WINDOV~q'RIP INTRM1 M/U whip stock assembly - RIH to 3837' - break circ - orient whip stock to 59 degrees left of high side '16:00 - 17:00 1.00 WINDOV~SETW INTRM1 RIH f/3837' to 3865' (top of bridge plug) set btm trip anchor w/20 K slack off wt. - pull test to 20 K over - shear starting mill f/whip stock w/ 47 K slack off wt. ~ 17:00 - 19:30 2.50 WINDOV rSTWP INTRM1 ' Mill window from 3840' to 3856'. 19:30 - 21:30 2.00 DRILL DRLG INTRM1 Drill formation with milling assy from 3856' to 3878'. 21:30 - 22:00 0.50 DRILL ClRC INTRM1 Circulate'& cond mud/hole for FIT. 22:00 - 23:00 1.00 DRILL FIT INTRM1 Pull up into csg shoe. R/U and perform FIT to 12.5 ppg. (460 psi with 9.6 ppg mud in hole.) 23:00 - 00:00 1.00 DRILL TRIP INTRM1 Oberve well static, pump dry job, and POOH. 8/17/2001 00:00 - 03:00 3.00 WINDOV q'RIP INTRM1 POOH f/3456' - L/D milling assembly 03:00- 03:30 0.50 WELCTL ClRC INTRM1 Flush stack 03:30 - 05:00 1.50 DRILL PULD INTRM1 M/U BHA #4 & test MWD Printed: 10/16/2001 8:48:36AM ANADRILL SCHLUMBERGER Survey report Client ................... : Phillips Alaska Inc. Field .................... : Colville River Well ..................... : CD2-33A API number ............... : 50-103-20381-01 Engineer ................. : St. Amour COUNTY: .................. : Doyon 19 STATE: ................... : Alaska Survey calculation methods Method for positions ..... : Minimum curvature Method for DLS ........... : Mason & Taylor Depth reference Permanent datum .......... : Mean Sea Level Depth reference .......... : Drill Floor GL above permanent ....... : 15.90 ft KB above permanent ....... : N/A DF above permanent ....... : 52.05 ft Vertical section origin Latitude (+N/S-) ......... : Departure (+E/W-) ........ : 0.00 ft 0.00 ft Platform reference point Latitude (+N/S-) ......... : -999.25 ft Departure (+E/W-) ........ : -999.25 ft Azimuth from rotary table to target: 232.04 degrees 13-Aug-2001 07:18:38 Page 1 of 7 Spud date ................ : 07-07-2001 Last survey date ......... : 13-Aug-01 Total accepted surveys...: 164 MD of first survey ....... : 0.00 ft MD of last survey ........ : 15355.00 ft Geomagnetic data Magnetic model ........... : BGGM version 2000 Magnetic date ............ : 07-Jul-2001 Magnetic field strength..: 1147.17 HCNT Magnetic dec (+E/W-) ..... : 25.32 degrees Magnetic dip ............. : 80.54 degrees MWD survey Reference Criteria Reference G .............. : 1002.68 mGal Reference H .............. : 1147.17 HCNT Reference Dip ............ : 80.54 degrees Tolerance of G ........... : (+/-) 2.50 mGal Tolerance of H ........... : (+/-) 6.00 HCNT Tolerance of Dip ......... : (+/-) 0.45 degrees Corrections Magnetic dec (+E/W-) ..... : 25.31 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) .... : 25.31 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N) ........ : No degree: 0.00 [(c)2001 Anadrill IDEAL ID6_lC_08] ANADRILL SCHLUMBERGER Survey Report 13-Aug-2001 07:18:38 Page 2 of 7 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 1 0.00 0.00 0.00 2 114.00 0.00 0.00 3 225.00 0.23 137.62 4 319.00 0.32 168.89 5 411.00 0.78 227.06 6 501.00 2.18 241.69 7 591.00 3.44 234.82 8 683.00 4.67 249.99 9 766.00 5.05 257.79 10 856.00 6.33 259.49 11 945.40 6.69 258.18 12 1034.00 6.39 258.78 13 1129.00 8.07 258.46 14 1223.00 9.35 256.53 15 1320.00 10.50 257.59 16 1414.00 13.19 257.58 17 1510.00 15.63 254.25 18 1604.00 17.47 248.07 19 1699.00 19.56 246.91 20 1795.00 21.95 247.39 21 1890.00 24.85 245.97 22 1985.00 27.10 246.77 23 2080.00 29.40 248.50 24 2175.00 31.59 251.60 25 2269.00 33.29 251.05 26 2363.00 35.39 251.83 27 2460.00 38.12 250.28 28 2555.00 41.28 246.82 29 2650.00 44.01 246.17 30 2744.00 46.50 244.34 TVD Vertical Displ Displ Total At DLS depth section +N/S- +E/W- displ Azim (deg/ (ft) (ft) (ft) (ft) (ft) (deg) i00f) 0.00 0.00 0.00 0.00 0.00 0.00 114.00 114.00 0.00 0.00 0.00 0.00 111.00 225.00 -0.02 -0.16 0.15 0.22 94.00 319.00 0.09 -0.56 0.33 0.65 92.00 410.99 0.83 -1.24 -0.08 1.24 90.00 500.96 3.12 -2.47 -2.04 3.20 90.00 590.85 7.51 -4.84 -5.75 7.51 92.00 682.62 13.83 -7.71 -11.53 13.87 83.00 765.33 20.33 -9.64 -18.27 20.66 90.00 854.88 28.31 -11.38 -27.02 29.32 89.40 88.60 95.00 94.00 97.00 94.00 96.00 94.00 95.00 96.00 95.00 95.00 95.00 95.00 94.00 94.00 97.00 95.00 95.00 94.00 943.70 1031.73 1125.97 1218.88 1314.43 1406.42 1499.39 1589.50 1679.58 1769.34 1856.52 1941.92 2025.60 2107.46 2186.79 2264.40 2342.11 2415.21 2485.08 2551.25 37.35 -13.35 -36.96 39.30 46.39 -15.36 -46.85 49.31 57.08 -17.73 -58.57 61.20 69.94 -20.82 -72.46 75.40 85.09 -24.56 -88.76 92.09 102.49 -28.71 -107.60 124.35 -34.57 -130.75 149.64 -43.28 -156.03 178.72 -54.85 -183.89 211.56 -68.05 -215.24 248.06 -83.01 -249.87 288.37 -99.67 -287.99 331.67 -116.76 -329.57 377.48 -133.16 -374.89 425.08 -149.31 -422.65 475.09 -166.18 -472.92 529.96 -185.04 -527.80 588.13 -207.28 -584.23 650.45 -232.95 -643.24 715.44 -260.91 -703.86 Srvy tool type 0.00 0.00 TIP 0.00 0.00 MWD 137.62 0.21 MWD 149.72 0.18 MWD 183.74 0.73 MWD Tool qual type 219.51 1.60 MWD - 229.93 1.45 MWD - 236.22 1.76 MWD - 242.19 0.92 MWD - 247.16 1.43 MWD - 250.15 0.44 MWD 251.85 0.35 MW 253.16 1.77 MWD 253.97 1.40 MWD 254.53 1.20 MWD 2.86 2.68 2.71 2.23 2.50 3.11 2.40 2.57 2.84 1.84 2.28 2.97 4.06 2.91 2.99 111.36 255.06 135.24 255.19 161.92 254.50 191.89 253.39 225.74 252.46 263.29 251.62 304.75 250.91 349.64 250.49 397.83 250.45 448.25 250.54 501.27 250.64 559.30 250.68 619.91 250.47 684.13 250.09 750.66 249.66 ANADRILL SCHLUMBERGER Survey Report 13-Aug-2001 07:18:38 Page 3 of 7 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) TVD Vertical Displ Displ Total At DLS Srvy Tool depth section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type 31 2841.00 49.88 243.17 97.00 2615.91 32 2937.00 53.48 245.17 96.00 2675.42 33 3032.00 54.98 247.49 95.00 2730.96 34 3128.00 57.93 247.70 96.00 2784.00 35 3221.00 60.51 248.04 93.00 2831.59 36 3316.00 62.99 248.74 95.00 2876.55 37 3410.00 66.33 249.74 94.00 2916.78 38 3508.00 67.44 250.08 98.00 2955.25 39 3602.00 69.73 249.35 94.00 2989.57 40 3696.00 72.02 249.37 94.00 3020.36 786.23 -292.90 -768.68 859.84 -325.68 -836.47 934.52 -356.60 -907.06 1011.59 -387.09 -981.03 1088.45 -417.19 -1055.04 1168.74 1249.88 1335.66 1419.04 1503.82 -448.00 -1132.83 -478.10 -1212.27 -509.06 -1296.91 -539.40 -1378.99 -570.70 -1462.09 822.59 897.64 974.64 1054.64 1134.53 1218.20 1303.14 1393.24 1480.73 1569.53 249.14 3.60 MWD 248.73 4.09 MWD 248.54 2.53 MWD 248.47 3.08 MWD 248.42 2.79 MWD 248.42 2.69 MWD 248.48 3.68 MWD 248.57 1.18 MWD 248.64 2.54 MWD 248.68 2.44 MWD 41 3794.00 73.58 249.62 98.00 3049.34 1593 42 3889.00 74.27 250.29 95.00 3075.65 1679 43 3984.00 74.75 249.62 95.00 3101.02 1767 44 4076.00 75.10 248.83 92.00 3124.95 1851 45 4171.00 75.65 248.30 95.00 3148.93 1940 .12 .98 .09 .96 .08 -603.49 -1549.78 -634.78 -1635.53 -666.16 -1721.53 -697.67 -1804.59 -731.26 -1890.15 1663.13 1754.40 1845.93 1934.76 2026.68 248.72 1.61 MWD 248.79 0.99 MWD 248.85 0.85 MWD 248.86 0.91 MWD 248.85 0.79 MWD 46 4267.00 76.00 247.43 47 4361.00 75.85 248.62 48 4457.00 75.16 248.38 49 4551.30 74.53 248.32 50 4647.00 73.95 248.05 51 4743.00 73.18 247.69 52 4839.00 73.71 247.22 53 4933.00 74.48 247.83 54 5027.00 74.94 249.66 55 5123.00 75.05 249.20 96.00 94.00 96.00 94.30 95.70 96.00 96.00 94.00 94.00 96.00 3172.44 3195.30 3219.33 3243.99 3269.98 3297.14 3324.49 3350.25 3375.04 3399.90 2029 2117 2206 2293 2382 2470 2559 2646 2733 2821 .63 .28 .41 .77 .24 -766.33 -1976.37 -800.45 -2060.92 -834.51 -2147.40 -868.10 -2232.00 -902.32 -2317.50 .83 -937.01 -2402.80 .53 -972.29 -2487.78 .65 -1006.85 -2571.32 .49 -1039.71 -2655.82 .98 -1072.29 -2742.63 2119.74 2210.91 2303.85 2394.87 2486.97 2579.03 2671.03 2761.42 2852.08 2944.80 248.81 0.95 MWD 248.77 1.24 MWD 248.76 0.76 MWD 248.75 0.67 MWD 248.73 0.66 MWD 248.70 0.88 MWD 248.65 0.72 MWD 248.62 1.03 MWD 248.62 1.94 MWD 248.65 0.48 MWD 56 5219.00 75.07 249.52 57 5314.00 75.22 250.07 58 5410.00 75.02 250.01 59 5504.00 74.77 251.14 60 5600.00 75.40 249.67 96.00 95.00 96.00 94.00 96.00 3424.65 3449.00 3473.66 3498.15 3522.86 2910.53 -1104.99 -2829.44 2997.98 -1136.70 -2915.61 3086.22 -1168.37 -3002.82 3172.27 -1198.56 -3088.40 3260.30 -1229.67 -3175.79 3037.55 3129.36 3222.11 3312.82 3405.54 248.67 0.32 MWD 248.70 0.58 MWD 248.74 0.22 MWD 248.79 1.19 MWD 248.83 1.62 MWD ANADRILL SCHLUMBERGER Survey Report 13-Aug-2001 07:18:38 Page 4 of 7 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) TVD Vertical Displ Displ Total At DLS Srvy Tool depth section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type 61 5694.00 75.94 250.16 94.00 3546.13 3346 62 5777.00 76.14 250.68 83.00 3566.15 3423 63 5895.00 75.56 251.27 118.00 3595.00 3531 64 6007.00 74.52 247.62 112.00 3623.92 3634 65 6103.00 73.63 244.87 96.00 3650.26 3724 66 6197.36 72.62 241.53 67 6293.00 71.72 239.28 68 6388.00 69.78 236.32 69 6484.00 68.20 232.33 70 6577.00 67.11 229.34 71 6674.00 66.50 226.81 72 6768.00 65.78 224.97 73 6864.00 65.22 224.81 74 6959.00 64.95 225.00 75 7055.00 64.50 223.92 76 7151.00 64.02 224.35 77 7246.00 63.68 224.27 78 7342.00 63.54 223.10 79 7436.00 62.87 223.64 80 7531.00 62.57 223.17 94.36 95.64 95.00 96.00 93.00 97.00 94.00 96.00 95.00 96.00 96.00 95.00 96.00 94.00 95.00 96.00 95.00 95.00 95.00 95.00 81 7627.00 64.23 223.73 82 7722.00 64.09 223.40 83 7817.00 63.95 222.83 84 7912.00 63.56 222.39 85 8007.00 63.15 222.64 86 8102.00 62.86 222.33 95.00 87 8197.00 62.57 221.70 95.00 88 8292.00 62.28 220.90 95.00 89 8386.00 63.61 222.14 94.00 90 8481.00 64.55 222.83 95.00 3677.66 3706.95 3738.27 3772.70 3808.07 3846.28 3884.30 3924.11 3964.13 4005.12 4046.82 4088.68 4131.35 4173.73 4217.27 4260.26 4301.66 4343.28 4385.29 4427.89 4471.01 4514.56 4558.54 4601.30 4642.82 .98 -1260.94 -3261.33 .42 -1287.94 -3337.22 .65 -1325.24 -3445.39 .87 -1363.21 -3546.68 .36 -1400.39 -3631.17 3812 3903 3992 4081 4167 .93 -1441.09 -3711.76 .00 -1486.05 -3790.92 .21 -1533.82 -3866.81 .73 -1586.05 -3939.60 .72 -1640.36 -4006.28 4256.66 -1699.92 -4072.61 4342.12 -1759.75 -4134.34 4428.80 -1821.64 -4195.99 4514.29 -1882.67 -4256.81 4600.34 -1944.62 -4317.61 4685 4770 4855 4938 5022 .99 -2006.69 -4377.83 .49 -2067.71 -4437.40 .57 -2129.89 -4496.79 .52 -2190.89 -4554.41 .00 -2252.23 -4612.43 5106 5191 5275 5359 5443 .87 -2314.54 -4671.46 .44 -2376.50 -4730.39 .80 -2438.84 -4788.76 · 86 -2501.55 -4846.44 · 60 -2564.13 -4903.82 3496.60 3577.12 3691.47 3799.65 3891.85 3981.69 4071.78 4159.90 4246.88 4329.10 248.86 0.76 MWD 248.90 0.65 MWD 248.96 0.69 MWD 248.98 3.28 MWD 248.91 2.91 MWD 4413.15 4493.27 4574.35 4654.55 4735.33 248.78 3.55 MWD - 248.59 2.43 MWD - 248.36 3.58 MWD - 248.07 4.21 MWD - 247.73 3.20 MWD - 247.34 2.48 MWD 246.94 1.95 MWD 246.53 0.60 MWD 246.14 0.34 MWD 245.75 1.12 MWD 4815.83 245.37 4895.50 245.02 4975.70 244.66 5053.97 244.31 5132.94 243.97 5213.41 243.64 5293.80 243.33 5374.02 243.01 5453.96 242.70 5533.74 242.40 5527.07 -2626.56 -4961.00 5613.40 242.10 5610.21 -2689.29 -5017.51 5692.77 241.81 5692.95 -2752.55 -5073.08 5771.72 241.52 5775.25 -2815.22 -5128.58 5850.45 241.24 5859.51 -2878.23 -5186.29 5931.42 240.97 0.64 0.37 1.10 0.88 0.54 1.81 0.35 0.56 0.58 0.49 0.42 0.66 0.81 1.84 1.19 ANADRILL SCHLUMBERGER Survey Report 13-Aug-2001 07:18:38 Page 5 of 7 Seq Measured Incl Azimuth Course ~ depth angle angle length - (ft) (deg) (deg) (ft) 91 8576.00 65.10 221.84 92 8671.00 64.99 221.98 93 8766.00 64.79 221.69 94 8861.00 64.43 221.54 95 8957.00 63.67 220.15 95.00 95.00 95.00 95.00 96.00 96 9051.00 63.87 220.91 94.00 97 9146.00 64.93 222.10 95.00 98 9242.00 66.20 222.61 96.00 99 9337.00 65.41 222.61 95.00 100 9433.00 64.76 223.43 96.00 TVD Vertical Displ Displ Total At DLS depth section +N/S- +E/W- displ Azim (deg/ (ft) (ft) (ft) (ft) (ft) (deg) 100f) 4683.23 4723.32 4763.63 4804.36 4846.37 4887.92 4928.97 4968.68 5007.61 5048.06 101 9528.00 64.18 222.78 95.00 5089.00 102 9623.00 63.95 223.44 95.00 5130.55 103 9719.00 63.33 222.58 96.00 5173.18 104 9815.00 63.19 223.29 96.00 5216.37 105 9911.00 63.25 224.53 96.00 5259.63 95.00 95.00 96.00 95.00 95.00 94.00 95.00 95.00 96.00 96.00 95.00 93.00 92.00 94.00 93.00 106 10006.00 64.60 225.53 107 10101.00 66.26 225.40 108 10197.00 65.67 225.78 109 10292.00 65.24 226.49 110 10387.00 64.63 226.01 111 10481.00 64.32 225.10 112 10576.00 65.25 224.27 113 10671.00 66.21 225.36 114 10767.00 66.03 225.40 115 10863.00 65.59 225.04 116 10958.00 65.38 223.89 117 11051.00 65.22 224.75 118 11143.00 64.95 224.19 119 11237.00 64.97 222.88 120 11330.00 65.06 222.45 5301.38 5340.88 5379.98 5419.45 5459.69 5500.20 5540.67 5579.72 5618.58 5657.92 5697.34 5736.20 5774.96 5814.75 5854.03 5944.25 -2941.78 -5244.19 6029.04 -3005.88 -5301.72 6113.70 -3069.97 -5359.09 6198.11 -3134.14 -5416.09 6282.78 -3199.43 -5472.55 6365.41 -3263.52 -5527.34 6449.63 -3327.68 -5584.12 6535.79 -3392.26 -5643.00 6621.27 -3456.04 -5701.67 6707.26 -3519.69 -5761.07 6791.94 -3582.28 -5819.64 6876.34 -3644.65 -5878.03 6961.29 -3707.54 -5936.70 7045.94 -3770.31 -5995.10 7130.78 -3832.05 -6054.54 7215.47 -3892.35 -6114.91 7301.30 -3952.95 -6176.49 7388.42 -4014.30 -6239.12 7474.37 -4074.19 -6301.42 7559.99 -4133.69 -6363.59 7644.27 -4193.09 -6424.14 7729.51 -4254.19 -6484.58 7815.42 -4315.63 -6545.62 7902.61 -4377.28 -6608.10 7989.56 -4438.97 -6670.26 8075.24 -4500.65 -6730.81 8158.97 -4561.10 -6789.84 8241.68 -4620.64 -6848.29 8325.90 -4682.38 -6906.95 8409.07 -4744.37 -6964.08 6012.95 240.71 6094.55 240.45 6176.13 240.19 6257.54 239.94 6339.17 239.69 6418.88 239.44 6500.45 239.21 6584.14 238.99 6667.32 238.78 6751.16 238.58 6833.81 238.39 6916.26 238.20 6999.31 238.01 7082.13 237.83 7165.34 237.67 7248.62 237.52 7333.13 237.38 7418.98 237.24 7503.79 237.12 7588.32 236.99 7671.48 236.87 7755.51 236.73 7840.27 236.60 7926.39 236.48 8012.29 236.36 8096.89 236.23 8179.58 236.11 8261.32 235.99 8344.50 235.87 8426.59 235.73 1.11 0.18 0.35 0.40 1.52 0.76 1.59 1.41 0.83 1.03 0.87 0.67 1.03 0.68 1.15 1.71 1.75 0.71 0.82 0.79 0.93 1.26 1.45 0.19 0.57 1.12 0.86 0.63 1.26 0.43 Srvy tool type Tool qual type ANADRILL SCHLUMBERGER Survey Report 13-Aug-2001 07:18:38 Page 6 of 7 Seq Measured Incl Azimuth Course ~ depth angle angle length - (ft) (deg) (deg) (ft) 121 11423.00 64.69 223.51 122 11514.00 64.31 222.76 123 11607.00 64.02 223.28 124 11700.00 63.41 221.96 125 11793.00 64.22 222.71 126 11887.00 64.62 222.05 127 11979.00 64.54 222.42 128 12074.00 64.59 222.16 129 12167.00 64.47 220.36 130 12259.00 64.46 221.30 131 12353.00 64.85 220.43 132 12443.00 65.08 220.77 133 12536.00 65.17 220.78 134 12629.00 65.08 221.10 135 12724.00 64.92 220.75 136 12816.00 64.94 220.46 137 12907.00 64.52 218.81 138 13002.00 64.10 220.92 139 13094.00 64.80 220.89 140 13186.00 65.79 221.18 141 13280.00 66.10 221.15 142 13373.00 66.41 222.00 143 13466.00 66.70 221.22 144 13559.00 67.20 220.15 145 13652.01 66.83 219.78 146 13743.00 66.63 219.74 147 13836.00 65.81 219.76 148 13928.00 65.03 221.00 149 14022.00 64.76 222.35 150 14116.00 64.62 223.85 93.00 91.00 93.00 93.00 93.00 94.00 92.00 95.00 93.00 92.00 94.00 90.00 93.00 93.00 95.00 92.00 91.00 95.00 92.00 92.00 94.00 93.00 93.00 93.00 93.01 90.99 93.00 92.00 94.00 94.00 TVD depth (ft) 5893.52 5932.69 5973.22 6014.41 6055.44 6096.03 6135.52 6176.32 6216.32 6255.98 6296.22 6334.30 6373.42 6412.54 6452.69 6491.67 6530.52 6571.71 6611.39 6649.84 6688.15 6725.60 6762.60 6799.02 6835.34 6871.28 6908.78 6947.05 6986.94 7027.13 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) 100f) type type 8492.22 -4805.97 -7021.48 8573.37 -4865.90 -7077.64 8656.03 -4927.10 -7134.74 8738.29 -4988.46 -7191.21 8820.55 -5050.15 -7247.41 8508.73 235.61 1.11 8588.94 235.49 0.85 8670.69 235.37 0.59 8752.04 235.25 1.43 8833.40 235.13 1.13 8904.14 -5112.78 -7304.56 8986.01 -5174.30 -7360.41 9070.57 -5237.76 -7418.14 9153.04 -5300.88 -7473.51 9234.47 -5363.69 -7527.78 8916.11 8997.17 9080.91 9162.57 9243.20 9317.81 -5427.93 -7583.36 9397.74 -5489.85 -7636.43 9480.48 -5553.74 -7691.53 9563.28 -5617.47 -7746.82 9647.76 -5682.53 -7803.22 9325.76 9404.97 9487.03 9569.18 9653.05 235.01 0.76 MWD - 234.89 0.37 MWD - 234.78 0.25 MWD - 234.65 1.75 MWD - 234.53 0.92 MWD - 9729.44 -5745.80 -7857 9809.81 -5809.17 -7909 9893.48 -5874.87 -7964 9974.92 -5937.61 -8019 10056.96 -6000.65 -8074 234.41 0.93 MWD 234.29 0.43 MWD 234.17 0.10 MWD 234.05 0.33 MWD 233.94 0.37 MWD 10141.26 -6065.27 -8130 10224.97 -6128.95 -8187 10308.88 -6192.74 -8243 10392.78 -6257.63 -8299 10476.51 -6323.26 -8354 .46 9734.16 233.82 .95 9813.95 233.71 .82 9897.09 233.59 .17 9978.09 233.48 .04 10059.72 233.38 .54 10143.63 233.28 .03 10227.00 233.18 .69 10310.60 233.09 .47 10394.19 232.98 .47 10477.63 232.88 232.78 232.67 232.58 232.49 232.42 0.29 1.70 2.05 0.76 1.11 0.33 0.90 0.83 1.19 0.54 0.22 0.88 1.49 1.33 1.45 10558.19 -6387.52 -8407.93 10559.06 10641.34 -6452.95 -8462.35 10641.99 10723.27 -6516.68 -8516.55 10723.74 10807.00 -6580.26 -8573.14 10807.34 10890.94 -6642.30 -8631.20 10891.18 ANADRILL SCHLUMBERGER Survey Report 13-Aug-2001 07:18:38 Page 7 of 7 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 151 14210.00 64.78 222.97 152 14301.00 65.36 223.59 153 14395.00 65.40 223.77 154 14488.00 65.41 222.65 155 14580.00 65.57 222.70 156 14675.00 65.87 223.74 157 14768.00 66.01 222.20 158 14861.00 66.00 223.25 159 14951.00 66.43 222.97 160 15047.00 67.33 222.99 161 15139.00 68.30 222.22 162 15230.02 68.89 221.75 163 15281.00 69.09 222.73 Final Survey Projected to TD: 164 15355.00 69.09 222.73 94.00 91.00 94.00 93.00 92.00 95.00 93.00 93.00 90.00 96.00 92.00 91.02 50.98 74.00 TVD Vertical Displ Displ Total At DLS depth section +N/S- +E/W- displ Azim (deg/ (ft) (ft) (ft) (ft) (ft) (deg) 100f) 7067.30 7105.66 7144.82 7183.52 7221.69 7260.75 7298.67 7336.49 7372.79 7410.48 7445.22 7478.44 7496.72 7523.13 10974.96 -6704.04 -8689.60 10975.12 11056.52 -6764.11 -8746.17 11056.62 11141.07 -6825.91 -8805.19 11141.12 11224.62 -6887.55 -8863.09 11224.64 11307.22 -6949.09 -8919.83 11307.22 Srvy tool type 11392.79 -7012.19 -8979.13 11392.79 11476.64 -7074.33 -9037.01 11476.66 11560.48 -7136.74 -9094.66 11560.53 11641.84 -7196.87 -9150.94 11641.93 11729.03 -7261.46 -9211.13 11729.18 232.35 0.86 MWD 232.28 0.89 MWD 232.22 0.18 MWD 232.15 1.10 MWD 232.08 0.18 MWD 11813.06 -7324.16 -9268.79 11813.29 11896.50 -7387.15 -9325.48 11896.83 11943.40 -7422.38 -9357.47 11943.79 Tool qual type 232.01 1.05 MWD - 231.95 1.52 MWD - 231.88 1.03 MWD - 231.82 0.56 MWD - 231.75 0.94 MWD - 231.68 1.31 MWD 231.62 0.81 MWD 231.58 1.84 MWD 12011.61 -7473.16 -9404.38 12012.09 231.53 0.00 [(c)2001 Anadrill IDEAL ID6_lC_08] si Jr1 CIRI LL.I ild 113SEI::t~I C E S PHILLIPS ALASKA INC. END OF WELL REPORT ALPINE CD2-33A TABLE OF CONTENTS 1. General Information 2. . 4~ Sm m Sm Daily Summary Daily Operations Show Reports Bit Record Mud Reports Survey Record Formation Evaluation Logs . GENERAL WELL INFORMATION Company: Rig: Well: Field: Borough: State: Country: APl Number: Sperry.Sun Job Number: Job Start Date: Job End Date: Start Depth Logged: Total Depth Logged: Magnetic Declination: Dip Angle: Total Field Strength: Date Of Magnetic Data: Wellhead Coordinates N: Wellhead Coordinates W: Vertical Section Azimuth: SDL Engineers: Company Representatives: Company Geologist: SSDS Unit Number: Phillips Alaska Inc. Doyon Drilling No. 19 Alpine CD2-33A Alpine North Slope Alaska United States 50-103-20381-01 AKAM11119 August 06, 2001 August 13, 2001 6,000 ft. MD 15,355 ft. MD 25.32 deg 80.54 deg 1147.17 HCNT July 07, 2001 North 70 deg 20 min 18.48 sec East 151 deg 02 min 27.44 sec 232.04 deg Wayne Hermanson Mark Lindloff Reg Wilson Dave Burley / Don Mickey Meg Kremer / Dave Bannan 104 Phillips Alaska Inc. - CD2-33A (Alpine Wes0 Daily Surnrnar j 08-06-01 - Laid down excess 5" DP. Made up wash sub and flushed BOP stack. Replaced dies on grabber, changed out swivel assembly and tested to 3500 psi. Pulled wear bushing and installed test plug. Tested BOP's and related equipment. Made up BHA #1, loaded source and shallow tested tools at 470'. Tagged cement at 5780'. Cleaned out cement to 5799' and circulated bottoms up. Drilled out hard cement from 5799' to 5950'. Kicked offand sidetracked 8 ½" hole from 5950' to 6179' (3670'TVD). Note: Drilling new hole starting at 5985'. 08-07-01 - Directional drilled 8 ½" hole from 6179' to 6749'. Pumped a HiVis sweep at 6484' and observed 50% increase in returns at shaker when sweep came back. ECD before sweep was 11.58 ppg and 11.22 after. Changed out block in top drive torque wrench after die was dropped out of block. Directional drilled 8 ½" hole from 6719' to 8400'. Pumped sweeps every 500', alternating between HiVis of 300+ and 11.8 ppg weighted sweeps. ECD's reduced 0.1 - 0.2 ppg and returns varied between slight to 50% increase. No torque reduction was observed on sweeps. Hole angle was dropped from 74© to 63© and hole direction was turned and held from 250° to 220© 08-08-01 - Directional drilled 8 ½" hole from 8400' to 9605'. Circulated bottoms up. Pumped 40 bbl weighted HiVis sweep (11.8 ppg, 280 vis) and circulated hole clean. Observed 50% more cuttings on bottoms up of sweep. Back reamed first 3 stands at a pump rate of 550 gpm and rotated at 120 rpm Pulled out of the hole from 9224' to 8830' with 25-35k lbs over pull. Worked through tight hole from 8830' to 8770' with 35-50k lbs over pull. Continued back reaming from 8790' to 8557', pumping at 550 gpm and rotating at 120 rpm. Pulled out of the hole from 8557' to 8527' - hole pulled tight with 50k lbs over pull. Back reamed to 8177'. Pulled out of the hole from 8177' to 7875' - hole pulled tight with 50k lbs over pull. Back rem to 7511' - last 2 stands pulled at 1000 fi/hr. Pulled out of the hole from 7511' to 9 5/8" casing shoe. Circulated 150 bbls just below shoe, prior to hanging offblocks. Slipped and cut 90' of drilling line. Serviced top drive. 08-09-01 - Continued to service top drive. Ran in the hole from surface casing shoe to TD. Washed and reamed 60' to bottom. Directional drilled 8 ½" hole from 9605' to 10936' (5688' TVD). Worked pipe and circulated due to high line power outage. Directional drilled 8 ½" hole from 10936' to 11406' (5887' TVD). 08-10-01 - Directional drilled 8 ½" hole from 11406' to 11682'. Pumped 40 bbl HiVis sweep, which was weighted to 11.7 ppg and 150 vis. Circulated at 550 gpm, rotating at 110 rpm with a standpipe pressure of 1980 psi. Had 100% increase in returns at the shaker when the sweep came around. Wiper tripped and back reamed first 4 stands to 11318' at 30 min/std. Monitored well and it was static. Pulled out of the hole to 11085'at which point it pulled 10-20k lbs over. Attempted to work through tight hole at 11085' with 50k lbs over. Back reamed from 11126' to 10938' over a sand interval from 11000' to 10980'. Pulled out of the hole to 10585 with 10-15k lbs over pull. Attempted to work through tight spot at 10585' with 50k lbs over pull. Back reamed from 10652' to 10557', over sand interval from 10500' to 10460'. Pulled out of the hole from 10557' to 9129'. Ran in hole and washed the last stand to the bottom. Directional drilled 8 ½" hole from 11682' to 12428'. 08-11-01 - Directional drilled 8 ½" hole from 12428' to 12800' (6485'TVD). Rig lost High Line power. Trouble shot the problem and replaced a resistor in the ground fault loop. Continued to directional drill 8 ½" hole from 12800' to 13727' (6864'TVD). Circulated and conditioned mud/hole prior to short trip. Cleaned hole with a 40 bbl HiVis sweep. Back reamed out of the hole from 13727 to 13448'. Pulled out of the hole- wiper trip to 13311' 08-12-01 - Pulled out of the hole for a wiper trip from 13311' to 13266'. Back reamed from 13266' to 12988'. Continued to pull out of the hole from 12988' to 11318' with 10-15k lbs over pull. Performed a flow check. Ran in the hole to 12988' and filled pipe. Continued to run in the hole to 13639'. Washed from 13639' to 13727', Directional drilled 8 ½" hole from 13727' to 14950'. 08-13-01 - Directional drilled 8 ½" hole from 14950' to 15355' (7523.1 'TVD), which was the sidetrack total depth. Total displacement from surface location was 12,012' at an azimuth of 231.53°. Circulated and conditioned mud. Pumped stands out from 15312' to 15128'. Pulled out of the hole from 15128' to 10517'. Pumped Dry Job, and continued to pull out of the hole from 10517' to 9880'. Back reamed from 9880' to 9860' with 50k lbs over pull and pumped at 420 gpm while rotating at 50 rpm. Pulled out of the hole from 9860' to 9237' and back reamed to 9192'. Continued to pull out of the hole to 7505' - hole tight with 50k lbs over pull. Continued to back ream from 7564' to 7287' with 50k lbs over pull and pumped at 300 gpm while rotating at 50 rpm. Pulled out of the hole from 7287' to 71.90' and back reamed from 7190' to 7000' at 50 rpm and pumped at 500 gpm. Pulled out of the hole from 7000' to 6174'and back reamed from 6174' to 6139'. Continued to pull out of the hole to 5824' - observed 'well - static. Pumped DryJob and continued to pull out of the hole from 5824' to 376'. Stood back BI-IA, HWDP, jars and first stand of collars. Phillips Alaska Inc. - CD2A-33A (Alpine) West Daily Operations (I.A.D.C.) Time (hrs) 0806-2001 Elapsed Code Operations Breakdown Time 0000-0530 $.50 0530-0600 0.50 06004)830 2.50 0830.1330 5.0O 1330-1530 2.00 1530-1800 2.50 1800-1900 1.0O 1900-2100 2.0O 2100-2400 3.00 084)7-2001 00O0-0430 4.50 04304)500 0.50 0500-2400 19.00 0000-1215 12.25 1215.1400 1.75 1400-1530 1.50 1530-1615 0.75 1615.1715 1.00 1715.1930 2,25 1930-2130 1.50 2130.2230 1.50 2230-2330 1~0 2330-2400 0.50 084)9-2001 0000-0030 0.50 00304)330 3.00 0330-1800 14.50 1800-1830 0.60 1830-2400 5.50 08-10-2001 0000-0300 3.00 0300-0430 1.50 0430..O700 2.60 07004)900 2.00 09004)930 0.50 0930-1046 1.26 1045-1230 1.76 1230-2400 11.50 6 Lay down excess 6" DP. 21 Make up wash sub & flush BOP stack. 7 Replace dies on grabber, change out swivel assembly & test to 3500 psi. Pull wear bushing & install test plug. Test BOP's & related equipment. 6 Make up BHA #1, load source & shallow test tools at 470% 6 RIH. Tag cement at 5780'. 6 Clean out cement to 5799' & cimulate bottoms up. Drill out hard cement from 5799' to 5950'. 2 Kick off & sidetrack 8 ½" hole from 5950' to 6179' (3670'TVD). Note: Drilling new hole starting at $985'. 2 Directional drill 8 ½" hole from 6179' to 6749'. Pumped HNis sweep at 6484'. observed 50% increase in returns at shaker when sweep came back. ECD before sweep 11.58 ppg & 11.22 after. 8 Change out block in top drive torque wrench after die was dropped out of block. 2 Directional drill 8 ½" hole from 6719' to 8400'. Pumped sweeps every 500', alternating between H~is of 300+ & 11.8 ppg weighted sweeps. ECD's reduced 0.1 - 0.2 ppg & returns varied between slight to 50% increase. No torque reduction was observed on sweeps. 2 Directional drill 8 ½" hole from 8400' to 9605'. 6 Circulate bottoms up. Pumped 40 bbl weighted HiVis sweep (11.8 ppg, 280 vis) & circulate hole clean. Observed 50% more cuttings on bottoms up .of sweep, 3 Back ream first 3 stands at a pump rate of 660 gpm & rotating at 120 rpm. 6 POOH from 9224' to 8830' with 28-36k lbs over pull, Worked thru tight hole from 8830' to 8770' with 35-50k over pull. 3 Back ream from 8790' to 8667', pumping at 660 gpm & rotating at 120 rpm. 3 POOH from 8667' to 8527' - hole pulling tight with 50k lbs over pull. Back ream to 8177'. 3 POOH from 8177' to 7875' - hole pulling tight with 50k ilbs overpull. Back ream to 7611' - last 2 stands pulling at 1000 fi/hr. 6 POOH from 7611' to 9 6/8" casing shoe. Circulate 160 bbls just below shoe, prior to hanging off blocks, 9 Slip & cut 90' of drilling line. 7 Service top drive. 7 Service top drive. 6 RIH from surface casing shoe to TD. Wash & ream 60' to bottom. 2 Directional drill 8 ~/2" hole from 9606' to 10936' (6688' TVD) 6 Work pipe & circulate due to high line power outage. 2 Directional drill 8 ½" hole from 10936' to 11406' (5887' TVD) 2 Directional drill 8 ½" hole from 11406' to 11682', 5 Pumped 40 bbl HiVis sweep, weighted to 11.7 ppg & 150 vis. Circulated at 550 gpm, rotating at 110 rpm & a standpipe pressure of 1980 psi. Had 100% increase in retums at shaker when sweep came around. 3 Wiper trip - back ream t; 4 stands to 11318' at 30 minlstd. Monitor well - static. 6 POOH to 11085' - pulled 10-20k lbs over. Attempted to work through tight hole at 11085' with 50k ilbs over. Back reamed from 11126' to 10938' over sand interval from 11000' to 10980'. 6 POOH to 10585 with 10.15k lbs over pull, Attempted to work through tight spot at 10585' with 50k lbs over pull. Back ream from 10652' to 10557' - over sand interval from 10~00' to 10460', 6 POOH from 10557' to 9129'. 6 RIH. Wash last stand to bottom. 2 Directional drill 8 ½" hole from 11682' to 12428'. 08.15,2081 00004)400 4.00 0400-0530 1.50 0530-1930 14~0 1930-2200 2.50 2200-2330 1.50 2330-2400 0.50 08,12-2001 00004)200 2.00 0200-0300 t.00 03004)400 1.00 04004)500 1.00 0500-1200 7.00 1200-2400 12.00 2 Directional drill 8 ½" hole from 12428' to 12800' (6486'TVD). 21 Rig lost High Line power. Trouble shoot problem & replaced resistor in ground fault loop. 2 Directional drill 8 ½" hole from 12800 to 13727' (6864'TVD). 5 Circulate & condition mud/hole prior to short trip. Clean hole with a 40 bbi HiVis sweep. 3 Back ream out of hole from 13727 to 13448'. 6 POOH - wiper trip to 13311'. 3 POOH - wiper trip from 13311' to 13266% Back ream from 13266' to 12988'. 6 POOH from 12988' to 11318' with 10-15k lbs over pull. 6 Flow check. RIH to 12988' & fill pipe. 6 RIH to 13639'. Wash from 13639' to 13727'. 2 Directional drill 8 ~/2" hole from 13727' to 14095'. 2 Directional drill 8 ½" hole from 14095' to 14950'. Phillips Alaska Inc. - CD2A-33A (Alpine) West Daily Operations (I.A.D.C.) Time (hfs) Elapsed Code Operations Breakdown Time 08-13-2001 00004) 600 05004)800 0800-1000 1000-1200 1200-1430 1430-1500 1 500-1700 1700-1800 1800-1930 1930-2100 2100-2330 2330-2400 5.00 3.00 2.00 2.00 2.00 0.5 2.00 1.00 1.50 1.50 2.50 O.fiO 2 Directional drill 8 1/=,, hole from 14950 to 15355' (7523~VD). Sidetrack total depth. $ Circulate & condition mud. 6 Pump out from 15312' to 15128'. 6 POOH from 15128' to 12579' 3 POOH from 12579 to 10517. Pumped dry job, continued POOH from 10517' to 9880'. 6 Back ream from 9880' to 9860' with fi0k lbs over pull. Rotate at 50 rpm & pump at 420 gpm. 3 POOH from 9860' to 9237'. Back ream to 9192'. Continue to POOH to 7505'. tight 50K over. 3 Back ream from 7564' to 7287' with 50k lbs over. Rotate at 50 rpm & pump at 300 gpm. 3 POOH from 7287' to 7190'. Back ream from 7190' to 7000', rotating at fl0 rpm & pumping at 500 gpm. 6 Continue POOH from 7000' to 6174'. Back reamed from 6174' to 6139'. POOH to fi824'. 6 Observe well (static). Pumped DryJob & POOH from 5824' to 376'. 20 Stand back BHA, HWDP, jars & first stand of DC's. Location: Alpine DRILLING SERVICES Operator: PM~ips~Jaska inc. Show Repod Repo~ Prepa;;~ By:-W;~e ~eT~&~;on Repo~ Delivered To: Meg Kreme~ % Depth e~2 ff Gas Units ~:0 Mud Chlorides (ppm) = 400 Flowline Sackgrouad Show ppm ppm ppm Hydrocarbon Ratios C1 99638 9848 = 88792 C1/C2 = 13.9 C2 7138 758 = 8380 C1/C3= 27,2 C3 3582 322 = 3280 C1/C4= 58,3 C4 1824 249 = 1578 Cl/C5= 99.2 C5 1039 144 = 895 Production 1000.0 NPH t00.0 Producible ~d ..... boris % Chlorides (ppm) = *0/ Gas Flowline Backgrot~ndShow I 0.0 ppm ppm ppm Hydrocarbon Ratios C2 1858 758 = 08 CllC3= '¢623 C3 ~;¢~9 ;3~: = 54Z Cl/C4= 43(~ NPH C4 488 245 = 220 C1/C5= 714t ! 1.0 C5 2~ 44 = 124 Production ~alysis: NomProducible Hydrocarbons Depth (MD) 8800 to 8850 ft (TVD) 3897 to 3918 ft Show Report No.1 Date/Time: OT-Au9-01 Hydrocarbon Ratios C1 C1 C1 CI C2 C3 C4 C5 [ LWHOLOGY: ] Sandstone: clear to translucent, white, occasionally black, ultra fine to very }Evaluate section for probable production as fine grained grading to sittstone, sub angular to sub roand, mderate~y sorted, indicated by the plotted curve within the following: very friable to predominantly loose grains, calcareous cement in part, clay matrix, dull to occasionally bright orange/yellow fluorescence, instantaneous pale yellow cut, oil observed at shaker, a. Productive &T gas zones may shox~ oaly C 1, but abnormally high C 1 only shows are usually indicative of salt water. SHOW EVALUATION: Th~ Pixler pict indicates a gas zone for both shows. The s~con~ zone t~nds towars non productive, The fact that oft was observed at the shaker and good cut properties, this zgp~s ma_Y be effective as a light oil producers. b, tf the C t/C2 ratio fidis low in the oil section, with ti~e Ct/C4 rstio high ia the gas sectioa, die zone is probably non-productive, o. l'fan5 ratio (C 1/C5 excepted ifoil mud is used) is lo~er than a preceding ratio, the zone is probably nomprodncfive Location: A~pfl~e DRILLING SERVICES Operator: P'h~i~ps AJa~k~ ~. Show Repo~ RepoA Prepa~ed-b~' ' Wa~m~; t'~;rrf;8%;of~ .... Depth(MD) 7130 to 7270 (TVD) 4038 to 4099 Show Repo~ No, Date/Time: % Depth 7220 ft Gas Units 3040 Mud Chlorides (ppm) = 300 F~ow~ine IBacl(grou~d Show ppm ppm ppm Hydrocarbon Ratios C1 18~358 11743 = I749f 5 C1/C2 = 15.7 C2 ti951 799 = 11152 C1/C3 = t8.2 C3 10035 419 = 9818 Ct/C4 = 30,3 C4 8028 244 = 5782 C1/C5 = 84.7 C5 3370 174 = 31~ Production Non-Producible Hydrocarbons 1000,0 NPH 100,0 Hydrocarbon Ratios C1 O1 C1 Ct C2 C3 C4 C5 Depth ~25~¢ ft Gas Units 203? Mud Ch!ofides(ppm) = 00 F~owline Back~lrou~d Show ppm ppm ppm C1 147039 177, = ~38198 C2 8213 799 = 74t4 C3 7788 419 = 7369 C4 4385 244 = 4'~21 C5 252~ 14 = 23~,7 Production Analysis: ~r- ~il Wa~er INca-Producible Hydrocarbons Hydrocarbon Ratios C1/C2 = 238 Ct/C3 = 1737 C1/C4 = 424 CI/C5 = 745 [ LITHOLOGY: ] 10,0 NPH Sandstone: clear to translucent, tan to medium brown, ultra fine to vei¥ fine : Evaluate section fur probable production as grained, _grading to siltstone, sut~ af)`gu[a[ ~to ?~ rd?d, moderately sort%d, indicated by the plotted curve within the follo¥¥ing: YeW friable to predominately loose grains, clay matrix, dull to occasionally bright orange/gold fluorescence, instantaneous pale yellow cut, oil observed at shaker. [SHOW EVALUATION: The Pixler plol~!nd!c~tfs~ g?s zgne for both shows. Since a steam still a Productive dry gas zones may show only ( l, but abnormally high C 1 only shows are usually indicative of salt water b. If fl~e C t/C2 ratio falls tow ia the oil section, x~ith the C1/C4 ratio high in the gas section, the zone is probably non-productive wes not used [Er th!s~anafiysis, agd therefore tend to show gas when s. If any ratio (C t/C5 excepted if oil nmd is used) is oil is the case. This ma{ be agood ~oil producing zone given ~e fa~ that lower dmn a preceding ratio, the zoae is probably oil was obse~ed a~ ~h~ ~ha~r ap~ samples indicate good fluorescence non-productive. and cut. ,~ D(~ r~ ~j] [~ WelIN .... CD2-33A Location: A~pine DRiLLiNG SERVICES Operator: Phi¢~ips Show Report Repod Prepared By: Wayn~ Repo~ Delivered To: Meg Kremer % Depth 7580 ~ Gas Units 1830 Mud Chlorides (ppm) = 300 FIowtirm Background Show ppm ppm ppm Ct 82899 7216 = 75463 C2 2665 4z02 = 2253 C3 901 380 = 52l C4 746 349 = 397 C5 ~5 367 = I98 Producaon % Depth ~ Gas Units Fiowiine IBackgrotmc~ Show ppm ppm ppm C1 C2 C3 C4 C5 Production I L~TNOLOGY: Hydrocarbon Ratios Cl/C2 = 33.4 CI/C3 = '¢44.9 Ct/C4 = I90.t Cl/C5 = 38%2 XiomProducibte Hydrocarbons Mud Chlorides (ppm) = Hydrocarbon C1 C2 1000.0 NPH Depth (MD) 7570 to 7610 fi (TVD) 4236 to 4253 ft Show Report No, 3 Date/Time: O7,,Aug--O t Hydrocarbon Ratios C1 C1 C1 C3 C4 C5 100.0 'Gas 10.0 Oil NPH 1.0 ~JomProducible Hydrocarbons Sandslone: salt and p~pper, clea~-to ti'a~S!~?'X~Yfine toaccasionally Evaluate section for probable production as fine gained, grading to siltstone in part, sub angula~ to sub [CUDd, indicated by the plotted curve within the fbllowing: moderately sorted, predominately loose grains to occasionally veW friable, a. Prodocdve do gas zones may show only C 1, bnt abnormally high C 1 only shows are tmtmlty indicative of' salt water. clay matrix, dull orange/yellow fluorescence, poor pale yellow cut: T~e ~ixie[ pl0~ indica~.e.s a gas zone, tending to non-productive, This zon~ w~uld probabl,~ be a poor candidate for gas production, as. indicated by s~mplesz b. If the C I/C2 ratio fails low in the oil sect/on, with the C 1/C4 ratio high in the gas sectiom the zone is probably non-productk e c. [f pay ratio (C t/C5 excepted if oil mud is used) is lower than a preceding ratio, the zone is probably non-productive, Depth (MD) 14905 to 14955 (TVD) 73Ev4 to 7374 Show Report No. Date/Time: 1 sperw-sun !We, Narne: CD233A I Location: ,~pine DRILLING SERVICES I Operator Phil!ipa Show Raper Report Prepared B~,:' Repo~ D ..... d To: % Depth ~4915 ~ Gas Un~s 5841 Mud CNoddes (ppm) =400 Hyd~r~n Ratios C1/02= 73 O1/O3= C1/C4= 15.3 Hydrocarbon Ratios Ci CI CI Ci C2 C3 C4 C5 Flow)iae Dackgromid Show ppm ppm Opm C1 301989 ¢F¢45 = 293544 C2 41005 678 = 40327 C3 43924 571 = 43353 C4 19468 . 29~ = _ 1917_¢_ C Production Analysis: NomPmduciNe HydrocaPeons Depth age} ~ Gas Units5236 Mud Choddes (p~m FIowl~ne ~ackground Show C4 R~S 297 = ~321 C!/05 = 496 C5 608 !53. = 59!5 Anal~is: Non-Producible Hydrocarbons [ LITHOLOGY: Ssn~tone: tan to light bro'w~, clear to opaque, very fineto fine occasionally medium grained, grading to silty in pa~, sub ro~n~_to sorted, light brown oil stain, fdab!e to ~c~asionai~y loose, pmdo 3% glauconite, siliceous cement, 30-40% bright straw yellow, fluorescence, moderateiv fast streamina male btue cut. [SHOW EVALUATION: Th? pixler Riot indigates a definite 0il ~one. SamP(eSfiisRl~ gogd po~ro~ity t and cut, therefore this zone has been ~raded as excellent for oi! production, I000 ~ ~ - NPH to ~ Evaluate section for probable production as indicated by the potted carve w~thN .*he R~I! swing Praducth, e dE,- gas znncs ma} show oMy C i, abnormally high C t only shows are usually iadicafix s of salt ~ a*,er if the Ci/C2 ratio fails Iow in ti~e oil sectioa, with the C1/C4 ratio b2gh in the gas section, the zone is probabI5 noo productive c if any ratio (C t,/C5 excepted ii' oi! mud is used) is lower tN'm a precediag ratio the zone is probably Boa-productive Location: DRILLING SERVICES Operator: ~qi~I~A[~sks Show Repo~ Repod Prepared By: ~¢ayr~e Repo~ Delivered To: Me9 Kremer % Depth ~5080 fi Gs~ U~its 2778 Mud Chlorides (ppm) = 400 ppm pp~ ppm Hydrocar~n Ratios C1 t72812 8445 = 164387 CI/C2 = 7.9 C2 2~531 ~78 = 20853 CI/C3 = 7,7 C3 22051 57I = 21480 C1/C4 = C4 9408 297 = 9111 Ci/C5 = 5t,5 C5 3346 ~53 = 3t93 Production Analysis: ~Water ~.Non-Prod ~cihl~ Hydrocarbons Debth 1~¢'¢ Mud Chlorides (ppm) = , u,,~5fl Gas Units ~ 3 400 F~owline Backgroand Show CI 32 4~;3 8445 = 3~30}8 CltC2= 38 C2 4423,5 78 = 43557 Ci/C3= 33 C3 58199 57 = 49628 CI/C4= 72 C4 22986 ?97 = 22689 C~/C5= 200 C5 ;~'372 '53 = 82'9 Pioduoflon Analysis: ~G~il ~a~ ~Non-Producible Hydrocarbons [ L[THOLOGY: Sandstone: tan to light brown, clear to opaque, YeW fine to fine grained, occasionally medium grained, 9fading to si~ in part, sub round to round, well to occasionai!y poorly so,ed, !i¢ht brown oii stain, friabie to occasionaiiy loose grains, predominantly quartz, 2% 9tauconite, siliceous cement, 40-50% brigh~ straw ye~iow fiuorescence, fast streaming ps~e blue cut. [SHOW EVALUATION: yh~ ~ixler pict indicates an oil zone, The tirol p~gk R!?t~.9~ th~ lighter end. Dep~ (MD) 14970 to ~5128 (TVD) 7380 to 7438 Show Repo~ No, Date/Time: t3-~g-81 Hydrocarbon Ratios Ct CI Ci CI C2 C3 C4 C5 i000 10.0 Evaluate section for probable production as indicated by the plotted curve within the ¢.;!!owh:g: Prodac~ive &3, gas zones ma~ si~aw abnormally high Cf only shows are usoally indicative of salt ~ atcr b, If the C i/C2 ratio fslls low in lbo oil section, with the C 1/C4 ratio high in the gas section the zone is probably non-productive into_ account fluorescence qua!i.{'/~ p~[gsity_~p~ ~mo~gt_o.~_Cas . c if any ratio (C l/C5 cxcept~ if oil mad is used) is d~t~9)ed o_yer t.his interval, this zone has b~o r~J:~d ~a~ exp~!lcntjqr 9ii lower [han a precedh~g ratio, the zone is probably productiga, non-productive. I II I I I III I I I I I I I I I I '-?'J:~'iiii':'i:i-;'i?:'':'?':~::":~':~'"'""""~:?:?:::;~" .... ;: ....... ":::'~ ........ ":~'~ .... '" .... ~:':':' '-~:~':"':":?~ -" :'";' ':~:~" :: ....... "~':~f-::~:~ ~LL ~3E: CD2-33A LOCATION: Alpine a ~ , , , BR BR ~ ~ BR JETS ~ ~u~ F~ Av~. ~.O.B R.P.M. ~ ~ T B G R~Pu REMARKS Run ~ ~ke T~e ~ O~ ~ R.O.P.] ~. i' O D L B ~O' R , ~ ~ ~ , , , ,, ~, , ,, , , , ,~ , , , , , , , , , ~ , , ., , , , , , , , ~ , ~ ,, ,~ , ,~ , , , . , , , ~ ,, ,, ., ~ , ,, , ~ , ~, , i ~ ~, ~ ~ , , ~ , ~ , ~ , , ~ ,i,,, , , . ~ , , ~ , ~ , , , ., ,, ~ ~ , , , , , , , , ~ , , , ,, ,~ , ,. , ~, , ~ . , , ,, , , , ~ ,, , . : , , , ,,, , ~ , ~ , , , ~ ~ [~ ~ ..... , ~ ~, , , , ~ .... ~, ., ., , ,, ~ , [ , , , ~ , , ' , , , ~ , ~ , ~, ~ .! ~ , , , ~ , , , , ~ ~ , ~ ,, , , ,, . , , ~, , , ,, .,, ,., ,: .. , ~ ,~ ~ ~ ~ ~ ] ' , , ~ , ,] ~ , , r ,, , ,, , , , , ~ , , , , , ,, , , , , , ,,, ~ , , ~ , , . , , I I I I' II II I I I I I I Mud Properties for Alpine Well CD2-33A as reported by M-I Mud Engineer From Date Time (feet) (feet) (ppg) sec/qt600 300 200 100i 6 3 cP tbllO0'2 lOs iOta 30m AP! !HTHP AP1 HTHR %b),volume (ppb) (Pm) mg/I mg/I Pit 08/06/01 t0:00 5824 3578 '10.5 44 43 33 29' 25 12 10 10i 23 12 '14 t5 3.6'! 8.2 1. 2 11.00'2.00 87.00 tr 17.5 9,0 0,40 0,20/1.00 400 100 pit 08/07/01 .09:55 6960 6960 9.0 46 40 30 25 I~ 91 7 10 20 8j 9 11 4,51 8.4 1 2 8.00 1.00 91,00 tr 17,5 9.2 0.20 0.~J'5-/1.---~'-~200 80 Pit 08/07/01I 15:28. 7550 7550 9,7 42 36 26 22 17 8 6 10 16 7 8 10 4.8 8.8 1 2 7.50 0.00 93.00 tr 12,5 9.0 0,15 0.!.0_/1.80._300 80 Pit 08/07/01i23:00 83364579 9.8 43 34 25i26 16186 91 t6 8! 8194.9' 9.4 li 2 8.000.00 92,03 tr 15.0 8,90,100,10/1.50 400120 Pit 08/08/01 07:30 9220 4960 9,7 4,2 40 31 ~i 21 10 8 9 22 9 11 13 5,01 11.0 1 t 2 8.00 0.00 92.00 tr 15,0 9.3 0.15 0,~-5/1.20 300 100 Pit 08/08/0'i 22:30 9605 5122 10.0 39 38I 28! 24 19 9 8 10 '18 9 10 13 5.2 12.0 1 t 2 9.50 0.00 91,00 tr 13.8 --'9.00.10 0,10/1.20 400 100 Pit 08/09/01 09:30J 10159 5349 9.7 44 46 46 29 23 12t 10 11 24 11 13' 15 4.4 9.6 1 2 8,00 1.00 92.00 tr 15,0 9,0 (~.150.10/1.20 400 100 Pi~ 08/09/011 22:30 11291 5837 9.8 44 44 34 30 24 12 10 10 24 12 I4 16 3.6t 8.2 1 2 8.50 1.00 91.00 tr 15,0 8.9 0.30 0.30/1.60 500 80 Pit 08/10/0t 04:00 11682.6006 9.8 42 41 32 28 ~ 12 10 9 23 12! 4 15 4.4 910; ! 2 9.00 2.00 90.00 tr ;13.8 -9,0 0.~ 0.10/1.50 500 100 _Pit 08/10/0t 15:00 11785 6052 9.7 43 40 '32 28 23 12 10 81 24 111 14 16 3.2 8.8i 1 2 8.50 2.00 90.00 tr 12,5 9.0 0._200, i0-/1.20_450 80 ~i~ o~/.,.~/o.,].o..4:~o~:oo .~',~ '~ ~'~" '~'' :~ ~'o'~'!" ~2 ~ .~,, .,4 :~.~ ~.o ~i ~~.® :~.oo ~.oo t,- ',:~.s ~.o o..,o o.~o;~,.~ 4oo ~o , Pit 08/11/011 6564 9.8 43 41 32 28 24 12 t0 23 11 13J t5 4.0 8,21 2 8.00 2.00 90.00 tr 12,5 9,0 0.10 0.1)_/1.00 ,~,40080 _Pit 08/I1/01116:30 13543 6762 10.2 40 37 ,291 2~i 20 10! 8 i 21 9 11 t3 4.4 8.8 1 , 2 8.00 2.00 90.00 tr 12,5.__9.0 0._05 0.10/0.95 400 80 Pit 08/11/01 23:00 13727,6864 10.2, 41 40 ~ 20 10 8 10 20 10 11 12 2.8i 6,0 1 1 2 9.50 7.00 84.00 tr 11,3 9,3 0.30 0.15/1.30 350 80 Pit 08/12/01J03:00 13727!6864 10.2I 41 40j2o10J 8 10 20 10 11i 12 2.8 6.0 1! 29.50 7.00 84,00 tr 11,3 9,3 (~130 .1511.30 --350 80 Pit 081t2/01 15:45 14375 7138 10,2 42 371 28 24! 19 9, 7 9 19 tl13 2.2 6,8 1' 2 9.® 5.00 86.'03 tr 12,5 9,0 0.25 ,20t1.10 400 80 --~ --m - m m m m , . m m m {mmmm m m { { --- ANADRILL SCHLUMBERGER Survey report Client ................... : Phillips Alaska Inc. Field .................... : Colville River Well ..................... : CD2-33A API number ............... : 50-103-20381-01 Engineer ................. : St. Amour COUNTY: .................. : Doyon 19 STATE: ................... : Alaska Survey calculation methods Method for positions ..... : Minimum curvature Method for DLS ........... : Mason & Taylor Depth reference .................... Permanent datum .......... : Mean Sea Level Depth reference .......... : Drill Floor GL above permanent ....... : 15.90 ft KB above permanent ....... : N/A DF above permanent ....... : 52.05 ft Vertical section origin Latitude (+N/S-) ......... : Departure (+E/W-) ........ : 0.00 ft 0.00 ft Platform reference point .......... Latitude (+N/S-) ......... : -999.25 ft Departure (+E/W-) ........ : -999.25 ft Azimuth from rotary table to target: 232.04 degrees 13-Aug-2001 07:18:38 Page 1 of 7 Spud date ................ : 07-07-2001 Last survey date ......... : 13-Aug-01 Total accepted surveys...: 164 MD of first survey ....... : 0.00 ft MD of last survey ........ : 15355.00 ft Geomagnetic data ........... Mag~letic model ........... : BGGM version 2000 Magnetic date ............ : 07-Jul-2001 Magnetic field strength..: 1147.17 HCNT Magnetic dec (+E/W-) ..... : 25.32 degrees Magnetic dip ............. : 80.54 degrees ...... MWD survey Reference Criteria .......... Reference G .............. : 1002.68 mGal Reference H .............. : 1147.17 HCNT Reference Dip ............ : 80.54 degrees Tolerance of G ........... : (+/-) 2.50 mGal Tolerance of H ........... : (+/-) 6.00 HCNT Tolerance of Dip ......... : (+/-) 0.45 degrees Corrections Magnetic dec (+E/W-) ..... : 25.31 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-) .... : 25.31 degrees (Total az corr = magnetic dec - grid cony) Sag applied (Y/N) ........ : No degree: 0.00 [(c)2001 Anadrill IDEAL ID6_1C_08] ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) 1 0.00 0.00 0.00 2 114.00 0.00 0.00 3 225.00 0.23 137.62 4 319.00 0.32 168.89 5 411.00 0.78 227.06 Course length (ft) 0.00 114.00 111.00 94.00 92.00 6 501.00 2.18 241.69 7 591.00 3.44 234.82 8 683.00 4.67 249.99 9 766.00 5.05 257.79 10 856.00 6.33 259.49 90.00 90.00 92.00 83.00 90.00 11 945.40 6.69 258.18 12 1034.00 6.39 258.78 13 1129.00 8.07 258.46 14 1223.00 9.35 256.53 15 1320.00 10.50 257.59 89.40 88.60 95.00 94.00 97.00 16 1414.00 13.19 257.58 17 1510.00 15.63 254.25 18 1604.00 17.47 248.07 19 1699.00 19.56 246.91 20 1795.00 21.95 247.39 94.00 96.00 94.00 95.00 96.00 21 1890.00 24.85 245.97 22 1985.00 27.10 246.77 23 2080.00 29.40 248.50 24 2175.00 31.59 251.60 25 2269.00 33.29 251.05 95.00 95.00 95.00 95.00 94.00 26 2363.00 35.39 251.83 27 2460.00 38.12 250.28 28 2555.00 41.28 246.82 29 2650.00 44.01 246.17 30 2744.00 46.50 244.34 94.00 97.00 95.00 95.00 94.00 13-Aug-2001 07:18:38 TVD Vertical Displ depth section +N/S- (ft) (ft) (ft) 0.00 114.00 225.00 319.00 410.99 500.96 590.85 682.62 765.33 854.88 943.70 1031.73 1125.97 1218.88 1314.43 1406.42 1499.39 1589.50 1679.58 1769.34 1856.52 1941.92 2025.60 2107.46 2186.79 2264.40 2342.11 2415.21 2485.08 2551.25 0.00 0.00 0 0.00 0.00 0 -0.02 -0.16 0 0.09. -0.56 0 0.83 -1.24 -0 3.12 -2.47 -2 7.51 -4.84 -5 13.83 -7.71 -11 20.33 -9.64 -18 28.31 -11.38 -27 Page 2 of 7 Displ Total At DLS Srvy Tool +E/W- displ Azim (deg/ tool qual (ft) (ft) (deg) 100f) type type .00 .00 .15 .33 .08 .04 .75 .53 .27 .02 37.35 -13.35 -36.96 46~39 -15.36 -46.85 57.08 -17.73 -58.57 69.94 -20.82 -72.46 85.09 -24.56 -88.76 102.49 -28.71 -107.60 124.35 -34.57 -130.75 149.64 -43.28 -156.03 178.72 -54.85 -183.89 211.56 -68.05 -215.24 248.06 -83.01 -249.87 288.37 -99.67 -287.99 331.67 -116.76 -329.57 377.48 -133.16 -374.89 425.08 -149.31 -422.65 475.09 -166.18 -472.92 529.96 -185.04 -527.80 588.13 -207.28 -584.23 650.45 -232.95 -643.24 715.44 -260.91 -703.86 0.00 0.00 0.22 0.65 1.24 0.00 0.00 TIP 0.00 0.00 MWD 137.62 0.21 MWD 149.72 0.18 MWD 183.74 0.73 MWD 3.20 7.51 13.87 20.66 29.32 219.51 1.60 MWD 229.93 1.45 MWD 236.22 1.76 MWD 242.19 0.92 MWD 247.16 1.43 MWD 39.30 49.31 61.20 75.40 92.09 250.15 0.44 MWD 251.85 0.35 MWD 253.16 1.77 MWD 253.97 1.40 MWD 254.53 1.20 MWD 111.36 135.24 161.92 191.89 225.74 255.06 2.86 MWD 255.19 2.68 MWD 254.50 2.71 MWD 253.39 2.23 MWD 252.46 2.50 MWD 263.29 304.75 349.64 397.83 448.25 251.62 3.11 MWD 250.91 2.40 MWD 250.49 2.57 MWD 250.45 2.84 MWD 250.54 1.84 MWD 501.27 559.30 619.91 684.13 750.66 250.64 2.28 MWD 250.68 2.97 MWD 250.47 4.06 MWD 250.09 2.91 MWD 249.66 2.99 MWD ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 31 2841.00 49.88 243.17 32 2937.00 53.48 245.17 33 3032.00 54.98 247.49 34 3128.00 57.93 247.70 35 3221.00 60.51 248.04 36 3316.00 62.99 248.74 37 3410.00 66.33 249.74 38 3508.00 67.44 250.08 39 3602.00 69.73 249.35 40 3696.00 72.02 249.37 97.00 96.00 95.00 96.00 93.00 95.00 94.00 98.00 94.00 94.00 TVD depth (ft) 2615.91 2675.42 2730.96 2784.00 2831.59 2876.55 2916.78 2955.25 2989.57 3020.36 41 3794.00 73.58 249.62 98.00 3049.34 42 3889.00 74.27 250.29 95.00 3075.65 43 3984.00 74.75 249.62 95.00 3101.02 44 4076.00 75.10 248.83 92.00 3124.95 45 4171.00 75.65 248.30 95.00 3148.93 96.00 94.00 96.00 94.30 95.70 96.00 96.00 94.00 94.00 96.00 96.00 95.00 96.00 94.00 96.00 46 4267.00 76.00 247.43 47 4361.00 75.85 248.62 48 4457.00 75.16 248.38 49 4551.30 74.53 248.32 50 4647.00 73.95 248.05 51 4743.00 73.18 247.69 52 4839.00 73.71 247.22 53 4933.00 74.48 247.83 54 5027.00 74.94 249.66 55 5123.00 75.05 249.20 56 5219.00- 75.07 249.52 57 5314.00 75.22 250.07 58 5410.00 75.02 250.01 59 5504.00 74.77 251.14 60 5600.00 75.40 249.67 3172.44 3195.30 3219.33 3243.99 3269.98 13-Aug-2001 07:18:38 Page 3 of 7 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) 100f) type type 786.23 -292 859.84 -325 934.52 -356 1011.59 -387 1088.45 -417 1168.74 -448 1249.88 -478 1335.66 -509 1419.04 -539 1503.82 -570 .90 -768.68 822.59 .68 -836.47 897.64 .60 -907.06 974.64 .09 -981.03 1054.64 .19 -1055.04 1134.53 1593.12 -603 1679.98 -634 1767.09 -666 1851.96 -697 1940.08 -731 .00 -1132.83 .10 -1212.27 .06 -1296.91 .40 -1378.99 .70 -1462.09 2029.63 -766 2117.28 -800 2206.41 -834 2293.77 -868 2382.24 -902 .49 -1549.78 .78 -1635.53 .16 -1721.53 .67 -1804.59 .26 -1890.15 3297.14 2470.83 -937 3324.49 2559.53 -972 13350.25 2646.65 -1006 3375.04 2733.49 -1039 3399.90 2821.98 -1072 .33 -1976.37 .45 -2060.92 .51 -2147.40 .10 -2232.00 .32 -2317.50 .01 -2402.80 .29 -2487.78 .85 -2571.32 .71 -2655.82 .29 -2742.63 2910.53 -1104.99 -2829.44 2997.98 -1136.70 -2915.61 3086.22 -1168.37 -3002.82 3172.27 -1198.56 -3088.40 3260.30 -1229.67 -3175.79 3424.65 3449.00 3473.66 3498.15 3522.86 1218.20 1303.14 1393.24 1480.73 1569.53 1663.13 1754.40 1845.93 1934.76 2026.68 2119.74 2210.91 2303.85 2394.87 2486.97 2579.03 2671.03 2761.42 2852.08 2944.80 3037.55 3129.36 3222.11 3312.82 3405.54 249.14 3.60 MWD 248.73 4.09 MWD 248.54 2.53 MWD 248.47 3.08 MWD 248.42 2.79 MWD 248.42 2.69 MWD 248.48 3.68 MWD 248.57 1.18 MWD 248.64 2.54 MWD 248.68 2.44 MWD 248.72 1.61 MWD 248.79 0.99 MWD 248.85 0.85 MWD 248.86 0.91 MWD 248.85 0.79 MWD 248.81 0.95 MWD 248.77 1.24 MWD 248.76 0.76 MWD 248.75 0.67 MWD 248.73 0.66 MWD 248.70 0.88 MWD 248.65 0.72 MWD 248.62 1.03 MWD 248.62 1.94 MWD 248.65 0.48 MWD 248.67 0.32 MWD 248.70 0.58 MWD 248.74 0.22 MWD 248.79 1.19 MWD 248.83 1.62 MWD ANADRILL SCHLUMBERGER Survey Report 13-Aug-2001 07:18:38 Page 4 of 7 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) 61 5694.00 75.94 250.16 62 5777.00 76.14 250.68 63 5895.00 75.56 251.27 64 6007.00 74.52 247.62 65 6103.00 73.63 244.87 66 6197.36 72.62 241.53 67 6293.00 71.72 239.28 68 6388.00 69.78 236.32 69 6484.00 68.20 232.33 70 6577.00 67.11 229.34 71 6674.00 66.50 226.81 72 6768.00 65.78 224.97 73 6864.00 65.22 224.81 74 6959.00 64.95 225.00 75 7055.00 64.50 223.92 76 7151.00 64.02 224.35 77 7246.00 63.68 224.27 78 7342.00 63.54 223.10 79 7436.00 62.87 223.64 80 7531.00 62.57 223.17 81 7627.00 64.23 223.73 82 7722.00 64.09 223.40 83 7817.00 63.95 222.83 84 7912.00 63.56 222.39 85 8007.00 63.15 222.64 86 8102.00 62.86 222.33 87 8197.00 62.57 221.70 88 8292.00 62.28 220.90 89 8386.00 63.61 222.14 90 8481.00 64.55 222.83 94.00 83.00 118.00 112.00 96.00 94.36 95.64 95.00 96.00 93.00 97.00 94.00 96.00 95.00 96.00 96.00 95.00 96.00 94.00 95.00 96.00 95.00 95.00 95.00 95.00 95.00 95.00 95.00 94.00 95.00 TVD Vertical Displ Displ Total At DLS Srvy Tool depth section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (ft) (deg) i00f) type type 3546.13 3346.98 -1260.94 -3261.33 3496.60 248.86 0.76 MWD 3566.15 3423.42 -1287.94 -3337.22 3577.12 248.90 0.65 MWD 3595.00 3531.65 -1325.24 -3445.39 3691.47 248.96 0.69 MWD 3623.92 3634.87 -1363.21 -3546.68 3799.65 248.98 3.28 MWD 3650.26 3724.36 -1400.39 -3631.17 3891.85 248.91 2.91 MWD 3677.66 3812.93 -1441.09 -3711.76 3981.69 248.78 3.55 MWD 3706.95 3903.00 -1486.05 -3790.92 4071.78 248.59 2.43 MWD 3738.27 3992.21 -1533.82 -3866.81 4159.90 248.36 3.58 MWD 3772.70 4081.73 -1586.05 -3939.60 4246.88 248.07 4.21 MWD 3808.07 4167.72 -1640.36 -4006.28 4329.10 247.73 3.20 MWD 3846.28 4256.66 -1699.92 -4072.61 4413.15 247.34 2.48 MWD 3884.30 4342.12 -1759.75 -4134.34 4493.27 246.94 1.95 MWD 3924.11 4428.80 -1821.64 -4195.99 4574.35 246.53 0.60 MWD 3964.13 4514.29 -1882.67 -4256.81 4654.55 246.14 0.34 MWD 4005.12 4600.34 -1944.62 -4317.61 4735.33 245.75 1.12 MWD 4046.82 4685.99 -2006.69 -4377.83 4815.83 245.37 0.64 MWD 4088.68 4770.49 -2067.71 -4437.40 4895.50 245.02 0.37 MWD 4131.35 4855.57 -2129.89 -4496.79 4975.70 244.66 1.10 MWD 4173.73 4938.52 -2190.89 -4554.41 5053.97 244.31 0.88 MWD 4217.27 5022.00 -2252.23 -~612.43 5132.94 243.97 0.54 MWD 4260.26 5106.87 -2314.54 -4671.46 5213.41 243.64 1.81 MWD 4301.66 5191.44~-2376.50 -4730.39 5293.80 243.33 0.35 MWD 4343.28 5275.80 -2438.84 -4788.76 5374.02 243.01 0.56 MWD 4385.29 5359.86 -2501.55 -4846.44 5453.96 242.70 0.58 MWD 4427.89 5443.60 -2564.13 -4903.82 5533.74 242.40 0.49 MWD . 4471.01 5527.07 -2626.56 -4961.00 5613.40 242.10 0.42 MWD 4514.56 5610.21 -2689.29 -5017.51 5692.77 241.81 0.66 MWD 4558.54 5692.95 -2752.55 -5073.08 5771.72 241.52 0.81 MWD 4601.30 5775.25 -2815.22 -5128.58 5850.45 241.24 1.84 MWD 4642.82 5859.51 -2878.23 -5186.29 5931.42 240.97 1.19 MWD : {i ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) 91 8576.00 65.10 221.84 92 8671.00 64.99 221.98 93 8766.00 64.79 221.69 94 8861.00 64.43 221.54 95 8957.00 63.67 220.15 Course length (ft) 95.00 95.00 95.00 95.00 96.00 TVD depth (ft) 4683.23 4723.32 4763.63 4804.36 4846.37 96 9051.00 63.87 220.91 94.00 4887.92 97 9146.00 64.93 222.10 95.00 4928.97 98 9242.00 66.20 222.61 96.00 4968.68 99 9337.00 65.41 222.61 95.00 5007-.61 100 9433.00 64.76 223.43 96.00 5048.06 101 9528.00 64.18 222.78 95.00 102 9623.00 63.95 223.44 95.00 103 9719.00 63.33 222.58 96.00 104 9815.00 63.19 223.29 96.00 105 9911.00 63.25 224.53 96.00 106 10006.00 64.60 225.53 107 10101.00 66.26 225.40 108 10197.00 65.67 225.78 109 10292.00 65.24 226.49 110 10387.00 64.63 226.01 95.00 95.00 96.00 95.00 95.00 111 10481.00 64.32 225.10 112 10576.00 65.25 224.27 113 10671.00 66.21 225.36 114 10767.00 66.03 225.40 115 10863.00 65.59 225.04 94.00 95.00 95.00 96.00 96.00 116 10958.00 65.38 223.89 117 11051.00 65.22 224.75 118 11143.00 64.95 224.19 119 11237.00 64.97 222.88 120 11330.00 65.06 222.45 95.00 93.00 92.00 94.00 93.00 5089.00 5130.55 5173.18 5216.37 5259.63 5301.38 5340.88 5379.98 5419.45 5459.69 5500.20 5540.67 5579.72 5618.58 5657.92 5697.34 5736.~20 5774.96 5814.75 5854.03 13-Aug-2001 07:18:38 Page 5 of 7 5944.25 -2941.78 6029.04 -3005.88 6113.70 -3069.97 6198.11 -3134.14 6282.78 -3199.43 -5244.19 6012.95 240.71 1.11 MWD -5301.72 6094.55 240.45 0.18 MWD -5359.09 6176.13 240.19 0.35 MWD -5416.09 6257.54 239.94 0.40 MWD -5472.55 6339.17 239.69 1.52 MWD 6365.41 -3263.52 6449.63 -3327.68 6535.79 -3392.26 6621.27 -3456.04 6707.26 -3519.69 -5527.34 6418.88 239.44 0.76 MWD -5584.12 6500.45 239.21 1.59 MWD -5643.00 6584.14 238.99 1.41 MWD -5701.67 6667.32 238.78 0.83 MWD -5761.07 6751.16 238.58 1.03 MWD 6791.94 -3582.28 6876.34 -3644.65 6961.29 -3707.54 7045.94 -3770.31 7130.78 -3832.05 -5819.64 6833.81 238.39 0.87 MWD -5878.03 6916.26 238.20 0.67 MWD -5936.70 6999.31 238.01 1.03 MWD -5995.10 7082.13 237.83 0.68 MWD -6054.54 7165.34 237.67 1.15 MWD 7215.47 -3892.35 7301.30 -3952.95 7388.42 -4014.30 7474.37 -4074.19 7559.99 -4133.69 -6114.91 7248.62 237.52 1.71 MWD -6176.49 7333.13 237.38 1.75 MWD -6239.12 7418.98 237.24 0.71 MWD -6301.42 7503.79 237.12 0.82 MWD -6363.59 7588.32 236.99 0.79 MWD 7644.27 -4193.09 7729.51 -4254.19 7815.42 -4315.63 7902.61 -4377.28 7989.56 -4438.97 -6424.14 7671.48 236.87 0.93 MWD -6484.58 7755.51 236.73 1.26 MWD -6545.62 7840.27 236.60 1.45 MWD -6608.10 7926.39 236.48 0.19 MWD -6670.26 8012.29 236.36 0.57 MWD 8075.24 -4500.65 8158.97 -4561.10 8241.68 -4620.64 8325.90 -4682.38 8409.07 -4744.37 -6730.81 8096.89 236.23 1.12 MWD -6789.84 8179.58 236.11 0.86 MWD -6848.29 8261.32 235.99 0.63 MWD -6906.95 8344.50 235.87~ 1.26 MWD -6964.08 8426.59 235.73 0.43 MWD Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) i00f) type type ~mmm mm m r - m ~ ~ - m m mmm~mmm ~mmmmmm~mmmm~ ~ m ~mmmmm~mmmm~ ~mr~mm~m~ ~ ~ ANADRILL SCHLUMBERGER Survey Report 13-Aug-2001 07:18:38 Page 6 of 7 Seq Measured Incl Azimuth Course # depth angle angle length - (ft) (deg) (deg) (ft) TVD depth (ft) 121 11423.00 64.69 223.51 93.00 5893.52 122 11514.00 64.31 222.76 91.00 5932.69 123 11607.00 64.02 223.28 93.00 5973.22 124 11700.00 63.41 221.96 93.00 6014.41 125 11793.00 64.22 222.71 93.00 6055.44 126 11887.00 64.62 222.05 127 11979.00 64.54 222.42 128 12074.00 64.59 222.16 129 12167.00 64.47 220.36 130 12259.00 64.46 221.30 131 12353.00 64.85 220.43 132 12443.00 65.08 220.77 133 12536.00 65.17 220.78 134 12629.00 65.08 221.10 135 12724.00 64.92 220.75 136 12816.00 64.94 220.46 137 12907.00 64.52 218.81 138 13002.00 64.10 220.92 139 13094.00 64.80 220.89 140 13186.00 65.79 221.18 141 13280.00 66.10 221.15 142 13373.00 66.41 222.00 143 13466.00 66.70 221.22 144 13559.00 67.20 220.15 14q 13652.01 66.83 219.78 94.00 92.00 95.00 93.00 92.00 94.00 90.00 93.00 93.00 95.00 92.00 91.00 95.00 92.00 92.00 94.00 93.00 93.00 93.00 93.01 90.99 93.00 92.00 94.00 94.00 146 13743.00 66.63 219.74 147 13836.00 65.81 219.76 148 13928.00 65.03 221.00 149 14022.00 64.76 222.35 150 14116.00 64.62 223.85 Vertical Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) 100f) type type 8492.22 -4805.97 -7021.48 8573.37 -4865.90 -7077.64 8656.03 -4927.10 -7134.74 8738.29 -4988.46 -7191.21 8820.55 -5050.15 -7247.41 8508.73 235.61 1.11 MWD 8588.94 235.49 0.85 MWD 8670.69 235.37 0.59 MWD 8752.04 235.25 1.43 MWD 8833.40 235.13 1.13 MWD 6096.03 6135.52 6176.32 6216.32 6255.98 8904.14 -5112.78 -7304.56 8986.01 -5174.30 -7360.41 9070.57 -5237.76 -7418.14 9153.04 -5300.88 -7473.51 9234.47 -5363.69 -7527.78 8916.11 235.01 0.76 MWD 8997.17 234.89 0.37 MWD 9080.91 234.78 0.25 MWD 9162.57 234.65 1.75 MWD 9243.20 234.53 0.92 MWD 6296.22 6334.30 6373.42 6412.54 6452.69 9317.81 -5427.93 -7583.36 9397.74 -5489.85 -7636.43 9480.48 -5553.74 -7691.53 9563.28 -5617.47 -7746.82 9647.76 -5682.53 -7803.22 9325.76 234.41 0.93 MWD 9404.97 234.29 0.43 MWD 9487.03 234.17 0.10 MWD 9569.18 234.05 0.33 MWD 9653.05 233.94 0.37 MWD 6491.67 -6530.52 6571.71 6611.39 6649.84 9729.44 -5745.80 -7857.46 9734.16 9809.81 -5809.17 -7909.95 9813.95 9893.48 -5874.87 -7964.82 9897.09 9974.92 -5937.61 -8019.17 9978.09 10056.96 -6000.65 -8074.04 10059.72 233.82 0.29 MWD 233.71 1.70 MWD 233.59 2.05 MWD 233.48 0.76 MWD 233.38 1.11 MWD 6688.15 6725.60 6762.60 6799.02 6835.34 10141.26 -6065.27 -8130.54 10143.63 10224.97 -6128.95 -8187.03 10227.00 10308.88 -6192.74 -8243.69 10310.60 10392.78 -6257.63 -8299.47 10394.19 10476.51 -6323.26 -8354.47 10477.63 233.28 0.33 MWD 233.18 0.90 MWD 233.09 0.83 MWD 232.98 1.19 MWD 232.88 0.54 MWD 6871.28 10558.19 -6387.52 -8407~93 10559.06 6908.78 10641.34 -6452.95 -8462.35 10641.99 6947.05 10723.27 -6516.68 -8516.55 10723.74 6986.94 10807.00 -6580.26 -8573.14 10807.34 7027.13 '10890.94 -6642.30 -8631.20 10891.18 232.78 0.22 MWD 232.67 0.88 MWD 232.58 1.49 MWD 232.49 1.33 MWD 232.42 1.45 MWD ANADRILL SCHLUMBERGER Survey Report Seq Measured Incl Azimuth # depth angle angle - (ft) (deg) (deg) Course length (ft) 151 14210.00 64.78 222.97 152 14301.00 65.36 223.59 153 14395.00 65.40 223.77 154 14488.00 65.41 222.65 155 14580.00 65.57 222.70 94.00 91.00 94.00 93.00 92.00 156 14675.00 65.87 223.74 157 14768.00 66.01 222.20 158 14861.00 66.00 223.25 159 14951.00 66.43 222.97 160 15047.00 67.33 222.99 95.00 93.00 93.00 90.00 96.00 161 15139.00 68.30 222.22 162 15230.02 68.89 221.75 163 15281.00 69.09 222.73 92.00 91.02 50.98 Final Survey Projected to TD: 164 15355.00 69.09 222.73 74.00 [(c)2001 Anadrill IDEAL ID6_iC_08] TVD depth (ft) 7067.30 7105.66 7144.82 7183.52 7221.69 7260.75 7298.67 7336.49 7372.79 7410.48 7445.22 7478.44 7496.72 7523.13 13-Aug-2001 07:18:38 Page 7 of 7 Vertical .Displ Displ Total At DLS Srvy Tool section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (ft) (ft) (ft) (deg) i00f) type type 10974.96 -6704.04 -8689.60 10975.12 11056.52 -6764.11 -8746.17 11056.62 11141.07 -6825.91 -8805.19 11141.12 11224.62 -6887.55 -8863.09 11224.64 11307.22 -6949.09 -8919.83 11307.22 232.35 0.86 MWD 232.28 0.89 MWD 232.22 0.18 MWD 232.15 1.10 MWD 232.08 0.18 MWD 11392.79 -7012.19 -8979.13 11392.79 11476.64 -7074.33 -9037.01 11476.66 11560.48 -7136.74 -9094.66 11560.53 11641.84 -7196.87 -9150.94 11641.93 11729.03 -7261.46 -9211.13 11729.18 232.01 1.05 MWD 231.95 1.52 MWD 231.88 1.03 MWD 231.82 0.56 MWD 231.75 0.94 MWD 11813.06 -7324.16 -9268.79 11813.29 11896.50 -7387.15 -9325.48 11896.83 11943.40 -7422.38 -9357.47 11943.79 231.68 1.31 MWD 231.62 0.81 MWD 231.58 1.84 MWD 12011.61 -7473.16 -9404.38 12012.09 231.53 0.00 MWD MWD/LWD Log Product Delivery Customer Phillips Alaska Inc. Dispatched To: AOGCC Well No CD2-33A Date Dispatche 15-Se.p-01 Installation/Rig Doyen 19 Dispatched By: Nate Rose LOG Run No. Scale Qri.gin..al Film No Of Prints No of Fl.oppies No of TaR.es Surveys (Paper) 2 RE{Cr::: iV'ED SE?.2 & ZOO1 ~,laska Oil & Gas C~ns. Commission Anchorage ..... Received By: Please sign and return to: Anadrill LWD Division 3940 Arctic Blvd, Suite 300 Anchorage, Alaska 99503 nrosel @slb.com Fax: 907-561-8417 LWD Log Delivery V1.1, Dec '97 ~KA 01L AND GAS CONSERVATION COMMISSION Scott Reynolds Phillips Alaska, Inc. PO Box 100360 Anchorage AK 99510-0360 TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re~ Colville River Unit CD2-33A Phillips Alaska, Inc. Permit No: 201-124 Sur. Loc. 1894' FNL, 1522' FEL, SEC. 2, T11N, R4E, UM Btmhole Loc. 1297' FSL, 289' FEL, SEC. 9, T1 IN, R4E, UM Dear Mr. Reynolds: Enclosed is the approved application for permit to drill the above referenced Well The AOGCC understands that CD2-33A is an extended reach well designed to evaluate the reservoir potential of the Alpine C & A interVals at a point between the Alpine West penetration and the final production well CD2-33B. Although LWD logs and samples will be obtained, the AOGCC understands there are no plans to test CD 2-33A. Furthermore, the application for permit to drill (201-124) includes the details of the plug and abandonment operations of the reserVoir delination portion of well CD2-33A. As long as the proposed P & A plans for CD2-33A are followed, it is not necessary to submit a separate 10-403 for AOGCC approval, however, any changes to the proposed plans may require the submission of a 10-403. Sufficient notice (24 hours) must be given to allow a representative of the Commission to witness the P & A operations. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use. Annular disposal has not been reqUested as part of the Permit to Drill application for CD2-33A. Please note that any disposal of fluids generated from this drilling operation which are pumped down the surface/production casing annulus of a well approved for annular disposal on cD-2 pad have to comply with the requirements and limitations of 20 AAC 25.080. ApProval of this permit to drill does not authorize disposal of drilling waste in a volume greater than 35,000 barrels through the annular space of a single well or to use that well for disposal purposes for a period longer than one year. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Permit No: 201-124 Page 2 of 2 All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Julie M. Heusser Commissioner BY ORDER OF THE COMMISSION DATED this ~. day of June, 2001 jjc/Enclosures CC~ Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. RECEIVED STATE OF ALASKA JUN i 9 ?.001 ALASKA OIL AND GAS CONSERVATION COMMISSION ..? PERMIT TO DRILL Alaska Oil & Gas Cons. Commission 20 AAC 25.005 ¢'~ ~ Anchorage la. Type of Work Drill ~ Redrill'X' ~ lb. Type of Well Exploratory X' Stratigraphic Test Development ~ Re-Entry Deepen! Service Development Gas Single Zone X Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Phillips Alaska, Inc. DF 52' feet Colville River Field a. Address 6. Property Designation Alpine Oil Pool P. O. Box 100360, Anchora~le, AK 99510-0360 ADL 387207, ASRCNPRA02 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 1894' FNL, 1522' FEL SEC. 2, T11N, R4E, UM Colville River Unit Statewide At target (=7" casing point ) 8. Well number Number 1549' FSL, 82' FEL SEC. 9, T11N, R4E, UM CD2-33A #U-630610 At total depth 9. Approximate spud date Amount 1297' FSL, 289' FEL SEC. 9, T11N, R4E, UM 06/30/2001 $200,0.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD ;'~ 'rVD) Property line 6200' from CD2-42 15339' MD 266' from east line of feet Feet 2560 7502' TVD feet ASRCNPRA02 ......... 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 7000' feet Maximum hole angle 75.35 aaxlrnurn surface 2645 pslg At total depth (TVD) 3371 at pslg 7450' TVD.SS 18. Casin~ prOgram ........................ ~eiti~ Depth, size Specifications Top Bottom Quantity of cement Hole .Casing Weight .... Grade .Coupling ...L~ngth MD TVD . M~ TVD (include sta~]e data) 42" 16" 62.5# H-40 Weld 77' 37' 37' '114' 114' Pre-installed 12:25,, 916'25,,' 4,0# L:..80 ... BTC 6463' 37' 37' 6500' 3730' 817 Sx Arcticset III L & "' 230 Sx Class G ,,, ..... , ................... ........ ,, ,,,,, ,,, 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical 20. Attachments .... Filing fee' X" Property plat "BoP '~ketcl~ ........ Di'verter"Sketch Drilling program' '"X Drilling fluid program X Time vs depth plot Refraction analysis Seabed report 20 AAC 25.050 requirements X 21. "'"1 hereby certify that the foregoing is true and correct to the best of my knowledge ................... Signed ./~,._ (~ ~'~ Title Drillin~l Team Leader Date (~/(~/¢', Commission Use Only .. ....... Permit Number .... I API number I [//'~)/~)~/(~ ..................................... A'pproval' date ............ see cover letter for ~-~,?-' /~. ~' 50-/~).,.~,- ~----~O ~<~;~',/- 4:~I . O. therrequirements ........................ Conditions of approval Samples required ~ No Mud Io~1 r,6quire~ No Hydrogen sulfide measures Yes ~J Directional survey required ~ No Required working pressure for BOPE 2M 3M i(--~M ' ~ 10M 15M t" ,,, r Other: ,,..~O p:~' ~ '~'' ~" I~O~ 4.¢~L OIA~G~NAL 81GNED BY Approved by ................. Comm!.~sioner ................ the commission Date Form 10-401 Rev. 7-24-89 t ;ate ORIGINAL CD2-33A Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 8-1/2" Hole / CD:~-33~, Event Risk Level f4itigation Strate~ly Abnormal Pressure in Moderate BOPE drills, Keep mud weight above 10.4 ppg. Surface Formations Check for flow during connections and if needed, >2000' TVD increase mud weight Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Abnormal Reservoir Low Well control drills, increased mud weight. Pressure ...... Hydrogen Sulfide gas Low "' H2S drills, detectiOn systemsl ala'~ms, standard"well control practices, mud scavengers Alpine; CD2-33A Summary Procedure 1, e CD2-33A 8-1/2" Hole Section. 1.1. PU standard Alpine directional drilling BHA. Inteq/Anadrill w/(GR/RES/NEUT/DENS) 1.2. RIH with drilling assembly. Dress-off plug #3. Kick off at +/- 7000' MDand drill sidetrack to TD @ approximately 15339'/viD. POOH. 1.3. RIH with 3-1/2" x 5" tapered drill string with mule shoe. 1.4. Set 1st balanced cement plug from 15339' to 7502'. POOH to 7502' and circulate clean. 1.5. POOH and PU cement retainer. RIH to no less than 50' above, or no more than 100' above the shoe. Set retainer at approximately 6450' MD. 1.6. By the down squeeze method pump sufficient cement through the retainer to extend 150' below (50' of casing volume plus 100' of 8.5" open hole volume plus 50 % excess). Lay a 50' cement cap on top of the retainer. (Weight test retainer before pumping cement job) 1.7. POOH to 300' MD. Pressure test plug to 1500 psi for 30 minutes. POOH for CD2-33B Sidetrack. CD2-33B 8-1/2" intermediate hole and 6-1/8" horizontal production hole. 2.1. RIH with casing scraper or gauge ring run on e-line to insure the casing is free of obstructions. 2.2. RU E-line and RIH with a bridge plug on a setting tool and GR/CCL. Log from 200' below to 200' above the planned bridge plug setting depth ~ +/- 3862' MI). 2.3. Set Bridge plug. Shut in well and test casing to 3500 psi for 30 minutes. 2.4. MU 9-5/8" Whipstock Assembly and RIH w/MWD to setting depth ~ 3862' MD. Orient whipstock and set. 2.5. Mill window in casing and approximately' 38' of new hole. Perform FIT to maximum 16 ppg EMW. POOH for drilling assembly. 2.6. PU standard Alpine 8-1/2" drilling assembly with GR/Res and RIH. 2.7. Drill 8-1/2" hole to 7" casing point ~ 10041' MD. POOH to run casing. 2.8. Run and cement 7 inch casing as per program. Top of cement + 500 feet MD above Alpine reservoir. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 2.9. BOPE test to 5000 psi. 2.10. Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling al~ead is 11.5 ppg EMW. 2.11. Drill 6 1/8" horizontal section to well TD ~ 13042' MD. 2.11.1. Contingency - set open hole isolation equipment if required (due to unconsolidated formation or wellbore having moved out of the Alpine reservoir sand). 2.12. Displace well to brine and pull out of hole. 2.13. Run 4 1/2, 12.6#, L-80 IBT-Mod tubing with SSSV nipple, gas lift mandrels and production packer. Land hanger. 2.14. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 2.15. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 2.16. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 mins. 2.17. Shear out valve in lowermost gas lift mandrel. Circulate tubing to diesel and install freeze protection in the annulus. 2.18. Set BPV and secure well..Move rig off. Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD2-33 will be the closest well to CD2-42PH. Accounting for survey tool inaccuracies, the ellipse separation between these wells will be 13.6' at 8800' MD. Drillinq Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard. LCM material has proved effective in dealing with lost circulation in previous development wells. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumpinq Operations: Incidental fluids developed from drilling operations on well CD2-33 will be disposed of into the annulus of another permitted well on the CD2 pad or the CD1-19a Class II disposal well. This well will not be permitted for annular disposal. CD2-33A DRILLING FLUID PROGRAM, ..... SPUD to intermediate hole to 7" Production Hole 9-5/8"surface casing casing point - 8 Y2" Section - 6 1/8" poi. nt- 12 1~,, . ........ Density 8.8- 9.6 ppg 9.6 '9.8 ppg 9'i"2 ppg ............ PV 10-25 10-15 YP 20 - 60 15 - 25 25 - 30 Funnel Viscosity 100 - 200 Initial Gels 4 - 8 10 - 15 10 minute gels <18 12 - 20 APl Filtrate NC- 10 cc / 30 min 4 - 12 cc/30 min (drilling) HPHT Fluid Loss at 12 - 14 cc/30 min 160 8.5 - 9.0 9.0 - 10.0 9.0 - 9.5 PH 6 % KCL , , Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline viscosity at _+ 200 sec/qt while drilling to the base of the permafrost. Lower viscosity to 90 sec/qt from the base of the permafrost to TD of the surface hole. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Sections CD2-33A: Fresh water gel / polymer mud system. Ensure good hole cleaning by maintaining fluid rheology and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of Iow drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section: The horizontal production interval will be drilled with a M-I FIo-Pro drill-in fluid. The base fluid will consist of 6% KCl, with _ 30PPB calcium carbonate bridging material to minimize formation damage. FIo-Vis Polymer and DuaI-FIo starch will be used for viscosity and fluid loss control respectively. RKB-GL= 37' Colv~lle R~ver F~eld CD2-33A ~ Prior to S~detracMng to CD2-33B Updated 06/I8/200 Wellhead Top ct Whip S!ock at +F 3832' MD 18" Conductor to 114' Bridge Plug set @ 3862' MD 9-5/8" 40 ppf L-80 BTC Surface Casing @ 6500' MD / 3730' TVD cemented to surface Cement Retainer set @ 6450' MD Top of Cement Plug #2 at +/- 6400' Per AOGCC 20 AAC 25,107 & 25,112 (b)(1) Plug #2: Volumes Based on Casing Capacity & 50% excess in open hole Cement with Class G + additives @ 158 ppg. Slurry: 100' X 0.4340 ft3/lt = 44 fi3 100' X 0.3941 ft3/ft x 1.5 = 60 It3 44 fi3 + 60 ft3 - 104 ft3 => 89 Sx @ 117 ft3/sk Bottom ct Cement Plug ¢2 at +/- 6600' 9.8 PPg drilling mud in hole Top Alpine Reservoir at 14975' MD / 7339' TVD CD2-33PB2 Hole TD at 15339' MD / 7502' TVD (+F 750 inc,) Cement Plug 564 ft Top of Cement Plug #1at +/~ 14775' 200' Above top of Alpine 100' excess coverage over the required 100' Per AOGCC 20 AAC 25,107 & 25112 (a)(1) CD2-33A PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well · Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114/114 10.9 52 53 9 5/8 6500 / 3730 14.5 1688 (0.4525 psi/ft)2440 8-1/2" hole TD 15339 / 7502 16.0 3395 (0.4525 psi/ft)N/A · NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP= FPP- (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point , ASP CALCULATIONS Drilling below conductor casing (16") ASP = [(FG x 0.052)- 0.1} D = [(10.9 x 0.052)- 0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1688 - (0.1 x 3730') = 1315 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052)-0.1} D = [(14.5 x 0.052)- 0.1] x 3730'= 2440 psi OR ASP = FPP - (0.1 x D) = 3395- (0.1 x 7502') = 2645 psi Alpine, CD2-33A Cementinq Requirements CD2-33 A Cement Plug #1: 15339' MD to 14775' MD = 564'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 564' X 0.3941 ft3/ft X 1.15 (15% excess) = 256 ft3 => 220 Sx @ 1.16 ft3/sk CD2-33 A Cement Plug ~Y2: 6600' MD to 6400' MD = 200'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 200' X 0.3941 ft3/ft X 1.15 {15% excess) = 90.6 ft~ => 80 sx @ 1.16 ft~/sk CD2-33A Plan View Field: Alpine Field Locofion: Norfh Slope, A osko <- West (feet) 760O 16800 16000 15200 14400 13600 12800 ~ 2000 ~ 1200 10400 9600 6800 8000 7200 6400 5600 4800 400O 3200 2400 ~ 600 800 0 248.33 AZIMUTH 18175' (TO PB1 TARGET) TRUE I CD2-33PB~ TARGET LOCATION: 1935' FSL, 2579' FEL SEC, 8, T11N, R4E A LOCATION: 17¢1' FSL, 2221' FWL SEC. 8, T11N, R4E ,? CD2-331 TD j 1297' FSL, 289' FEL SEC. 9, T11N, R4E 1600 8OO 0 800 1600 2400 3200 4000 4800 5600 6400 7200 8000 CD2-33A Phillips Alaska, Inc. a48.33 AZIMUTH 11095' (TO TARGET) TANGENT ANGLE ~..~b,o.-~7 63.40 DEG Verfical Secf[on (fee~) -> Azimu}h 248.~3 wffh reference CD2-33A Phillips Alaska, Inc.i Structure: CD#2 Well : 3~ Field : Alpine Field Location : Nodh Slope, Alaska 248.33 AZIMUTH 9oo i8175' (TO PB1 TA2GET) t KOP 900 ~ ~'°~°~Bui~d 2/~oo !4.00 O~: 2.00 deg per 00 ft 18.00 1800 22.00 28.00 Build 5/100 2700- 54,00C-20 DLS: 5.00 deg per 100 ft K~'2A KOP -- Sidetrack K 2 DEG ANG~n-.97 36.06 DEC ~A~bio~ .... CD2-33A For: S Reynolds [ Phillips Alaska, Inc. 1 Well : Location: North Slope, Alaska] Structure: CD#2 Field: Alpine Field Point KOP - Sidetrack Pt. K-2 EOC AIb[an-97 Albian-96 HRZ K-I LCU Miluveach A Alpine D Target - Alpine Base Alpine TD PROFILE COMMENT MD Inc Dir TVD 7000.00 75.35 248.55 5856.59 7659.09 66.78 229.46 4072.00 7985.59 65.40 219.39 4208.94 10565.61 65.40 219.59 5564.00 12049.00 65.40 219.39 6029.00 13994.55 65.40 219.59 6900.00 1 4289.58 63.40 219.59 7052.00 14651.15 65.40 219.39 7185.00 14874.60 63.40 219.39 7294.00 1 4899.17 63.40 219.39 7505.00 1 4975.12 63.40 219.39 7339.00 15129.24 65.40 219.59 7408.00 15559.20 65.40 219.59 7502.00 DATA North -1751.25 -2068.95 -2278.49 -4061.43 -5087.92 -6432.40 -6636.15 -6872.32 -7040.57 -7057.55 -7110.03 -7216.54 -7361.64 East -4408.08 -4939.84 -5145.72 -6609.78 -7452.68 -8556.69 -8724.00 -891 7.93 -9056.09 -9070.03 -9113.13 -9200.59 -9319.73 V. Sect Deg/1 O0 4743.21 0.00 5354.70 3.00 5625.41 3.00 7642.56 0.00 8804.74 0.00 10527.18 0.00 10557.91 0.00 10825.54 0.00 11015.86 0.00 11035.09 0.00 11094.52 0.00 11215.15 0,00 11579.43 0,00 CD2-33A 310 300 29O ]Phillips Alaska, Inc. i Structure: CD#2 Well : 33t1~ TRUE NORTH 350 0 ,340 "'550 21 O I0 2O 3O 280 270 2 260 250 240 230 220 140 210 / 150 200 160 180 170 '% Normal Plane Travelling Cylinder - Feet All depths shown are Measured depths on Reference Well 40 50 60 70 80 0 9O lO0 110 !20 130 CD2-33A Field : Alpine F~eld Location : Norih Slope <- West (feet) 360 340 320 300 280 260 240 220 200 180 160 140 120 100 8O 60 40 20 0 20 410 60 80 ~ - . . . . ~ 6250 , d ~00 8300 ~ 800 ~' . , 2960 - ~ SO0' 1290' ,~ ~0~ 0 300 f7~O .,.1600 ' ~900 : ~ ~20~-, .... .-'"'~00 ,.1100 e3°° - · - - .. 2OOO .... ~'5¢0~/. ~30~ '- ~500 ' ~00 ""~9o0 ';; . ' ¢.¢I00 .¢ aa00 ~' ' ' ' ' ,'~;oo,, ~oo e~%o ~ ~ooo CD2-33A Phillips Alaska, Inc. <- West (feet) 1600 1500 1400 1300 1200 1100 1000 900 600 700 600 500 400 300 200 ~ ~'~? 2400 2300 2200 2100 2000 1900 1700 .~¢¢0 ' ¢ 21 O0 - 11 O0 CD2-33A Phillips Alaska, Inc. Ffeld: Alpine Field Le¢~fion ; North Slepe, Aask<~ <- West (feet) 3900 3800 3700 3600 3500 3400 3300 3200 3100 3000 2900 2800 2700 2800 2500 2400 2300 2200 2100 2000 1900 1800 1700 7200 ' ~ .7000 ~ 5,~oo ~ ·3200; ~ ~6oo 7274 CD2~33A Phillips Alaska, Inc. <- West (feet) 7400 7200 7000 5800 6600 6400 6200 6000 5800 5600 5400 5200 5000 4800 4600 4400 4200 4000 3800 360O 5400 3200 3000 - ~4600 · '4~oo · 40qO. -." . ¢52~0 . 5600 ~: ,.-5~00 ,.-5~00 , ~2oo .50~;' · 7ooo.. ...... ssoo 6soo ~ 84~0 .~ 5400 ~ ¢ 4800 .' ./"~oo/7ooo .,'6~0 ~' ;/72~® J5200 3400 CD2-33A ~Phillips Alaska, Inc. Structure: CD#2 Well Field: A~pine Field LocoHon <- West (feel) 18000 ~7400 188OO I6200 158OO ~5000 ~¢400 J3800 ~$200 12800 12000 H¢O0 188OO 1020O 9600 9000 8400 780072OO 6800 8OOO 0~0 4800 *7'200 5800 · 7200 5400 5600 ' '5200 - ~oo , '7000 ,¢ )200 ~ '7400 4200 ~80 8400 CD2-33A COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB2 slot ~33 Alpine Field North slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB2 Version#II Our ref : prop4551 License : Date printed : 5-Jun-2001 Date created : 15-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33A COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field, North Slope, Alaska PROPOSAL LISTING Page 1 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O O R D S G E O G R A P H I C Depth Degrees Degrees Depth 0.00 0.00 0.00 0.00 100.00 0.00 248.33 100.00 200.00 0.00 248.33 200.00 300.00 0.00 248.33 300.00 400.00 0.00 248.33 400.00 500.00 0.00 248.33 500.00 600.00 1.00 248.33 599.99 700.00 2.00 248.33 699.96 800.00 3.00 248.33 799.86 900.00 4.00 248.33 899.68 1000.00 6.00 248.33 999.29 1100.00 8.00 248.33 1098.54 1200.00 10.00 248.33 1197.30 1300.00 12.00 248.33 1295.46 1400.00 14.00 248.33 1392.89 1500.00 16.00 248.33 1489.48 1600.00 18.00 248.33 1585.11 1700.00 20.00 248.33 1679.65 1800.00 22.00 248.33 1773.01 1900.00 24.00 248.33 1865.05 2000.00 26.00 248.33 1955.68 2100.00 28.00 248.33 2044.77 2200.00 30.00 248.33 2132.23 2299.99 33.00 248.33 2217.48 2399.99 36.00 248.33 2299.88 2499.99 39.00 248.33 2379.21 2599.99 42.00 248.33 2455.24 2699.99 45.00 248.33 ~527.77 2799.99 48.00 248.33 2596.60 2899.99 51.00 248.33 2661.54 2999.99 54.00 248.33 2722.41 3099.99 57.00 248.33 2779.04 3199.99 60.00 248.33 2831.29 3299.99 63.00 248.33 2879.00 3399.99 66.00 248.33 2922.04 3499.99 69.00 248.33 2960.31 3599.99 72.00 248.33 2993.69 3699.99 75.00 248.33 3022.09 3711.77 75.35 248.33 3025.10 4000.00 75.35 248.33 3097.98 4500.00 75.35 248.33 3224.42 5000.00 75.35 248.33 3350.85 5500.00 75.35 248.33 3477.29 6000.00 75.35 248.33 3603.72 6500.00 75.35 248.33 3730.15 7000.00 75.35 248.33 3856.59 7100.00 73.94 245.59 3883.07 7200.00 72.56 242.81 3911.90 7300.00 71.21 239.99 3943.00 7400.00 69.91 237.12 3976.28 C O O R D I N A T E S Easting Northing C O O R D I N A T E S 0.00S 0.005 0.00S 0.00S 0.00S 0.00S 0.32S 1.29S 2.90S 5.15S 8.37S 12.87S 18.65S 25.69S 34.00S 43.55S 54.34S 66.36S 79.60S 94.02S 109.62S 126.38S 144.28S 163.57S 184.48S 206.95S 230.93S 256.34S 283.12S 311.19S 340.48S 370.90S 402.38S 434.82S 468.14S 502.25S 537.05S 572.45S 576.65S 679.61S 858.22S 1036.82S 1215.43S 1394.03S 1572.64S 1751.25S 1788.97S 1830.64S 1876.12S 1925.30S 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.81W 371714.45 5974463.08 n70 20 18.47 w151 2 27.46 3.24W 371712.01 5974462.15 nT0 20 18.46 w151 2 27.53 7.30W 371707.93 5974460.61 n70 20 18.45 w151 2 27.65 12.97W 371702.22 5974458.45 n70 20 18.42 w151 2 27.82 21.07W 371694.06 5974455.37 n70 20 18.39 w151 2 28.05 32.40W 371682.67 5974451.07 n70 20 18.35 wlS1 2 28.38 46.93W 371668.03 5974445.54 n70 20 18.29 w151 2 28.81 64.66W 371650.19 5974438.79 n70 20 18.22 w151 2 29.33 85.57W 371629.15 5974430.84 n70 20 18.14 w151 2 29.94 109.62W 371604.94 5974421.70 n70 20 18.05 w151 2 30.64 136.79W 371577.59 5974411.37 n70 20 17.94 w151 2 31.43 167.05W 371547.14 5974399.86 n70 20 17.82 w151 2 32.32 200.35W 371513.62 5974387.19 n70 20 17.69 w151 2 33.29 236.66W 371477.07 5974373.39 n70 20 17.55 w151 2 34.35 275.93W 371437.55 5974358.45 n70 20 i7.40 wlS1 2 35.50 318.12W 371395.08 5974342.41 n70 20 17.23 w151 2 36.73 363.18W 371349.74 5974325.27 n70 20 17.06 w151 2 38.04 411.73W 371300.87 5974306.81 n70 20 16.87 wlS1 2 39.46 464.36W 371247.90 5974286.80 n70 20 16.66 wlS1 2 41.00 520.93W 371190.96 5974265.28 n70 20 16.44 w151 2 42.65 581.27W 371130.22 5974242.33 n70 20 16.20 w151 2 44.41 645.24W 371065.84 5974218.01 n70 20 15.95 w151 2 46.28 712.64W 370998.00 5974192.38 n70 20 15.69 w151 2 48.25 783.30W 370926.88 59'74165.51n70 20 15.41 w151 2 50.31 857.02W 370852.68 5974137.47 n70 20 15.12 w151 2 52.47 933.60W 370775.61 5974108.35 n70 20 14.82 w151 2 54.70 1012.83W 370695.86 5974078.22 n70 20 14.51 w151 2 57.02 1094.50W 370813.67 5974047.16 n70 20 14.20 w151 2 59.40 1178.37W 370529.25 5974015.27 n70 20 13.87 w151 3 01.85 1264.22W 370442.85 5973982.62 n70 20 13.53 w151 3 04.36 1351.81W 370354.68 5973949.31 n70 20 13.19 w151 3 06.92 1440.91W 370265.01 5973915.43 n70 20 12.84 w151 3 09.52 1451.49W 370254.36 5973911.40 n70 20 12.80 wlS1 3 09.83 1710.65W 369993.52 5973812.85 n70 20 11.79 w151 3 17.39 2160.22W 369541.03 5973641.88 n70 20 10.03 wlS1 3 30.52 2609.79W 369088.54 5973470.91 n70 20 08.27 wlS1 3 43.65 3059.36W 368636.05 5973299.95 n70 20 06.51 w151 3 56.77 3508.94W 368183.56 5973128.98 n70 20 04.75 w151 4 09.90 3958.51W 367731.07 5972958.01 n70 20 02.99 wlS1 4 23.02 4408.08W 367278.58 5972787.05 n70 20 01.23 w151 4 36.15 4496.81W 367189.23 5972750.83 n70 20 00.86 wlS1 4 38.74 4583.01W 367102.35 5972710.63 n70 20 00.45 w151 4 41.25 4666.45W 367018.16 5972666.57 n70 20 00.00 wlS1 4 43.69 4746.89W 366936.90 5972618.76 n70 19 59.52 wlS1 4 46.04 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33A COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. PROPOS/LL LISTING Page 2 CD#2,33PB2 Your ref : 33 PB2 Version~ll Alpine Field,North Slope, Alaska Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O O R D S G E O G R A P H I C Depth Degrees Degrees Depth C O O R D I N A T E S Easting Northing C O O R D I N A T E S 7500.00 68.66 234.20 4011.66 1978.05S 4824.12W 366858.80 5972567.33 n70 19 59.00 wltl 4 48.29 7600.00 67.46 231.24 4049.02 2034.22S 4897.92W 366784.06 5972512.42 n70 19 58.44 wltl 4 50.44 7659.09 66.78 229.46 4072.00 2068.95S 4939.84W 366741.57 5972478.40 n70 19 58.10 wl51 4 51.67 7700.00 66.32 228.22 4088.28 2093.655 4968.09W 366712.90 5972454.19 n70 19 57.86 wltl 4 52.49 7800.00 65.23 225.16 4129.33 2156.18S 5034.45W 366645.51 5972392.79 n70 19 57.24 wltl 4 54.43 7900.00 64.21 222.04 4172.04 2221.655 5096.80W 366582.06 5972328.40 n70 19 56.60 wl51 4 56.25 7983.59 63.40 219.39 4208.94 2278.49S 5145.72W 366532.19 5972272.39 n70 19 56.04 wl51 4 57.67 8000.00 63.40 219.39 4216.29 2289.83S 5155.03W 366522.69 5972261.22 n70 19 55.93 wl51 4 57.95 8500.00 63.40 219.39 4440.14 2635.36S 5438.76W 366233.18 5971920.56 n70 19 52.53 wltl 5 06.22 9000.00 63,40 219.39 4663.98 2980.88S 5722.49W 365943.67 5971579.91 n70 19 49.13 wl51 5 14.49 9500.00 63,40 219.39 4887.83 3326.41S 6006.22W 365654.17 5971239.25 n70 19 45.72 wl51 5 22.77 10000.00 63.40 219.39 5111.68 3671.94S 6289.95W 365364.66 5970898.60 n70 19 42.32 wl51 5 31.04 10500.00 63.40 219.39 5335.52 4017.47S 6573.68W 365075.15 5970557.94 n70 19 38.92 wl51 5 39.31 10563.61 63.40 219.39 5364.00 4061.43S 6609.78W 365038.32 5970514.60 nT0 19 38.49 wl51 5 40.37 11000.00 63,40 219.39 5559.37 4363.00S 6857.41W 364785.65 5970217.29 n70 19 35.52 wltl 5 47.58 11500.00 63.40 219.39 5783.22 4708.53S 7141.14W 364496.14 5969876.63 n70 19 32.12 wl51 5 55.86 12000.00 63.40 219.39 6007.06 5054.06S 7424.87W 364206.63 5969535.98 n70 19 28.72 wltl 6 04.13 12049.00 63.40 219.39 6029.00 5087.92S 7452.68W 364178.26 5969502.59 n70 19 28.38 wl51 6 04.94 12500.00 63.40 219.39 6230.91 5399.59S 7708,60W 363917.13 5969195.32 n70 19 25.32 wl51 6 12.39 13000.00 63.40 219.39 6454.75 5745.12S 7992.33W 363627.62 5968854.67 n70 19 21.91 wltl 6 20.66 13500.00 63.40 219.39 6678.60 6090.64S 8276.06W 363338.11 5968514.01 n70 19 18.51 wl51 6 28.93 13994.53 63.40 219.39 6900.00 6432.40S 8556.69W 363051.77 5968177.08 n70 19 15.15 wl51 6 37.11 14000.00 63.40 219.39 6902.45 6436.17S 8559.79W 363048.60 5968173.36 n70 19 15.11 wltl 6 37.20 14289.38 63.40 219.39 7032.00 6636.15S 8724.00W 362881.05 5967976.20 n70 19 13.14 wltl 6 41.98 14500.00 63.40 219.39 7126.29 6781.70S 8843.52W 362759.10 5967832.70 nT0 19 11.71 wltl 6 45.46 14631.13 63.40 219.39 7185.00 6872.325 8917.93W 362683.17 5967743.36 n70 19 10.82 wltl 6 47.63 14874.60 63.40 219.39 7294.00 7040.57S 9056.09W 362542.20 5967577.48 n70 19 09.16 wltl 6 51.66 14899.17 63.40 219.39 7305.00 7057.55S 9070.03W 362527.97 5967560.74 n70 19 08.99 wltl 6 52.06 14975.12 63.40 219.39 7339.00 7110.035 9113.13W 362484.00 5967509.00 n70 19 08.48 wltl 6 53.32 15000.00 63.40 219.39 7350.14 7127.23S 9127.25W 362469.59 5967492.05 n70 19 08.31 wl51 6 53.73 15129.24 63.40 219.39 7408.00 7216.54S 9200.59W 362394.76 5967403.99 n70 19 07.43 wltl 6 55.86 15339.20 63.40 219.39 7502.00 7361,64S 9319.73W 362273.19 5967260.94 n70 19 06.00 wltl 6 59.34 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot ~33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 Comments in wellpath MD TVD Rectangular Coords. Comment 7000.00 3856 7659.09 4072 7983.59 4208 10563.61 5364 12049.00 6029 13994.53 6900 14289.38 7032 14631.13 7185 14874.60 7294 14899.17 7305 14975.12 7339 15129.24 7408 15339.20 7502 59 1751.25S 4408.08W KOP - Sidetrack Pt. 00 2068.95S 4939.84W K-2 94 2278.49S 5145.72W EOC 00 4061.43S 6609.78W Albian-97 00 5087.92S 7452.68W Albian-96 00 6432.40S 8556.69W HRZ 00 6636.15S 8724.00W K-1 00 6872.32S 8917.93W LCU 00 7040.57S 9056.09W Miluveach A oo 7057.55s 9070.03w Alpine D 00 7110.03S 9113.13W CD2-33 PB2 Tgt Rvsd 5-Jun-01 00 7216.54S 9200.59W Base Alpine 00 7361.64S 9319.73W TD Casing positions in string 'A' =============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.15 1572.64S 3958.51W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised CD2-33 PB2 Tgt Rvsd 362484.000,5967509.000,0.0000 7339.00 7110.03S 9113.13W 5-Jun-2001 CD2-33 PB2 TD Rvsd 5 362295.300,5967276.090,0.0000 7502.00 7346.12S 9297.88W 5-Jun-2001 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB2 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB2 Version#ii Our ref : prop4551 License : Date printed : 5-Jun-2001 Date created : 15-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33A STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. PROPOSAL LISTING Page 1 CD~2,33PB2 Your ref : 33 PB2 Version~ll Alpine Field,North Slope, Alaska Last revised : 5-Jun-2001 Measured Inclin. Azimuth True Vert R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100ft Sect 0.00 0.00 0.00 0.00 0.00 S 0.00 E 0.00 0.00 100.00 0.00 248.33 100.00 0.00S 0.00E 0.00 0.00 200.00 0.00 248.33 200.00 0.00S 0.00E 0.00 0.00 300.00 0.00 248.33 300.00 0.00S 0.00E 0.00 0.00 400.00 0.00 248.33 400.00 0.00S 0.00E 0.00 0.00 500.00 0.00 248.33 500.00 0.00S 0.00 E 0.00 0.00 600.00 1.00 248.33 599.99 0.32S 0.81 W 1.00 0.87 700.00 2.00 248.33 699.96 1.29S 3.24 W 1.00 3.49 800.00 3.00 248.33 799.86 2.90S 7.30 W 1.00 7.85 900.00 4.00 248.33 899.68 5.15S 12.97W 1.00 13.96 1000.00 6.00 248.33 999.29 8.37 S 21.07W 2.00 22.67 1100.00 8.00 248.33 1098.54 12.87S 32.40W 2.00 34.86 1200.00 10.00 248.33 1197.30 18.65S 46.93W 2.00 50.50 1300.00 12.00 248.33 1295.46 25.69S 64.66W 2.00 69.58 1400.00 14.00 248.33 1392.89 34.00S 85.57W 2.00 92.07 1500.00 16.00 248.33 1489.48 43.55S 109.62W 2.00 117.96 1600.00 18.00 248.33 1585.11 54.34S 136.79W 2.00 147.19 1700.00 20.00 248.33 1679.65 66.36S 167.05W 2.00 179.75 1800.00 22.00 248.33 1773.01 79.60S 200.35W 2.00 215.58 1900.00 24.00 248.33 1865.05 94.02S 236.66W 2.00 254.65 2000.00 26.00 248.33 1955.68 109.62S 275.93W 2.00 296.91 2100.00 28.00 248.33 2044.77 126.38S 318.12W 2.00 342.31 2200.00 30.00 248.33 2132.23 144.28S 363.18W 2.00 390.79 2299.99 33.00 248.33 2217.48 163.57S 411.73W 3.00 443.03 2399.99 36.00 248.33 2299.88 184.48S 464.36W 3.00 499.66 2499.99 39.00 248.33 2379.21 206.95S 520.93W 3.00 560.53 2599.99 42.00 248.33 2455.24 230.93S 581.27W 3.00 625.47 2699.99 45.00 248.33 2527.77 256.34S 645.24W 3.00 694.29 2799.99 48.00 248.33 2596.60 283.12S 712.64W 3.00 766.82 2899.99 51.00 248.33 2661.54 311.19S 783.30W 3.00 842.85 2999.99 54.00 248.33 2722.41 340.48S 857.02 W 3.00 922.18 3099.99 57.00 248.33 2779.04 370.90S 933.60 W 3.00 1004.58 3199.99 60.00 248.33 2831.29 402.38S 1012.83W 3.00 1089.84 3299.99 63.00 248.33 2879.00 434.82S 1094.50W 3.00 1177.71 3399.99 66.00 248.33 2922.04 468.14S 1178.37W 3.00 1267.96 3499.99 69.00 248.33 2960.31 502.25S 1264.22W 3.00 1360.33 3599.99 72.00 248.33 2993.69 537.05S 1351.81W 3.00 1454.59 3699.99 75.00 248.33 3022.09 572.45S 1440.91W 3.00 1550.46 3711.77 75.35 248.33 3025.10 576.65S I451.49W 3.00 1561.84 4000.00 75.35 248.33 3097.98 679.61S 1710.65W 0.00 1840.70 4500.00 75.35 248.33 3224.42 858.22 S 2160.22W 0.00 2324.46 5000.00 75.35 248.33 3350.85 1036.82S 2609.79W 0.00 2808.21 5500.00 75.35 248.33 3477.29 1215.43S 3059.36W 0.00 3291.96 6000.00 75.35 248.33 3603.72 1394.03S 3508.94W 0.00 3775.71 6500.00 75.35 248.33 3730.15 1572.64S 3958.51W 0.00 4259.46 7000.00 75.35 248.33 3856.59 1751.25S 4408.08W 0.00 4743.21 KOP - Sidetrack Pt. 7100.00 73.94 245.59 3883.07 1788.97S 4496.81W 3.00 4839.60 7200.00 72.56 242.81 3911.90 1830.64S 4583.01W 3.00 4935.09 7300.00 71.21 239.99 3943.00 1876.12S 4666.45 W 3.00 5029.43 7400.00 69.91 237.12 3976.28 1925.30S 4746.89 W 3.00 5122.35 Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33A STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field, North Slope, Alaska Measured Inclin. Depth Degrees 7500.00 68.66 7600,00 67.46 7659,09 66.78 7700.00 66.32 7800.00 65.23 7900,00 64.21 7983,59 63.40 8000,00 63.40 8500,00 63.40 9000,00 63.40 9500.00 63.40 10000.00 63.40 10500.00 63.40 10563.61 63.40 11000.00 63.40 11500.00 63.40 12000.00 63.40 12049.00 63.40 12500.00 63.40 13000.00 63.40 13500.00 63.40 13994.53 63.40 14000.00 63.40 14289.38 63.40 14500.00 63.40 14631.13 63.40 14874.60 63.40 14899.17 63.40 14975.12 63.40 15000.00 63.40 15129.24 63.40 15339.20 63.40 PROPOSAL LISTING Page 2 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 Azimuth True Vert R E C T A N G U L A R Dogleg Vert Degrees Depth C O O R D I N A T E S Deg/100ft Sect 234.20 4011.66 1978.05 S 4824.12 W 3.00 5213.59 231.24 4049.02 2034.22 S 4897.92 W 3.00 5302.92 229.46 4072.00 2068.95 S 4939.84 W 3.00 5354.70 K-2 228.22 4088.28 2093.65 S 4968.09 W 3.00 5390.08 225.16 4129.33 2156.18 S 5034,45 W 3.00 5474.84 222.04 4172.04 2221.65 S 5096.80 W 3.00 5556.95 219.39 4208.94 2278.49 S 5145.72 W 3.00 5623.41EOC 219.39 4216.29 2289.83 S 5155.03 W 0.00 5636.25 219.39 4440.14 2635.36 S 5438.76 W 0.00 6027.52 219.39 4663.98 2980.88 S 5722,49 W 0.00 6418.78 219.39 4887.83 3326.41 S 6006,22 W 0.00 6810.05 219.39 5111.68 3671.94 S 6289,95 W 0.00 7201.32 219.39 5335.52 4017.47 S 6573,68 W 0.00 7592.59 219.39 5364.00 4061.43 S 6609.78 W 0.00 7642.36 Albian-97 219.39 5559.37 4363.00 S 6857,41W 0.00 7983.85 219.39 5783.22 4708.53 S 7141,14 W 0.00 8375.12 219.39 6007.06 5054.06 S 7424.87 W 0.00 8766.39 219.39 6029.00 5087.92 S 7452.68 W 0.00 8804.74 Albian-96 219.39 6230.91 5399.59 S 7708.60 W 0.00 9157.66 219.39 6454.75 5745.12 S 7992.33 W 0.00 9548.92 219.39 6678.60 6090.64 S 8276.06 W 0.00 9940.19 219.39 6900.00 6432.40 S 8556.69 W 0.00 10327.18 HRZ 219.39 6902.45 6436.17 S 8559.79 W 0.00 10331.46 219.39 7032.00 6636.15 S 8724.00 W 0.00 10557.91 K-1 219.39 7126.29 6781.70 S 8843.52 W 0.00 10722.73 219.39 7185.00 6872.32 S 8917.93 W 0.00 10825.34 LCU 219.39 7294.00 7040.57 S 9056.09 W 0.00 11015.86 Miluveach A 219.39 7305.00 7057.55 S 9070.03 W 0.00 11035.09 Alpine D 219.39 7339.00 7110,03 S 9113.13 W 0.00 11094.52 CD2-33 PB2 Tgt Rvsd 5-Jun-01 219.39 7350.14 7127.23 S 9127.25 W 0.00 11113.99 219.39 7408.00 7216.54 S 9200.59 W 0.00 11215.13 Base Alpine 219.39 7502.00 7361.64 S 9319.73 W 0.00 11379.43 TD Ail data is in feet unless otherwise stated, Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248,33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33A STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~I2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 Comments in wellpath ==================== MD TVD Rectangular Coords. Comment 7000.00 3856 59 7659.09 407200 7983 59 420894 10563 61 536400 12049 00 602900 13994 53 690000 1428938 703200 1463113 7185.00 1487460 7294.00 1489917 7305.00 1497512 7339.00 1512924 7408.00 1533920 7502.00 1751.25 S 4408.08 W KOP - Sidetrack Pt. 2068.95S 4939.84W K-2 2278.49S 5145.72W EOC 4061.43S 6609.78W Albian-97 5087.92S 7452.68W Afbian-96 6432.40S 8556.69W HRZ 6636.15S 8724.00W K-1 6872.32S 8917.93W LCU 7040.57S 9056.09W Miluveach A 7057.55S 9070.03W Alpine D 7110.03S 9113.13W CD2-33 PB2 Tgt Rvsd 5-Jun-01 7216.54S 9200.59W Base Alpine 7361.64S 9319.73W TD Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.15 1572.64S 3958.51W 9 5/8" Casing Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised CD2-33 PB2 Tgt Rvsd 362484.000,5967509.000,0.0000 7339.00 7110.03S 9113.13W 5-Jun-2001 CD2-33 PB2 TD Rvsd 5 362295.300,5967276.090,0.0000 7502.00 7346.12S 9297.88W 5-Jun-2001 Phillips Alaska, Inc. CD~2 33PB1 slot ~33 Alpine Field North Slope, Alaska 3-D MINIMUM DISTANCE CLEARANCE REPORT INCLUDING POSITION UNCERTAINTIES by Baker Hughes INTEQ Your ref : 33 PB1Version~ll Our ref : prop3683 License : Date printed : 6-Jun-2001 Date created : 22-Oct-1999 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Report is limited to clearances less than 500 feet Proximities will incorporate ellipses - when survey tools are defined for both wells. Ellipse separation in reverse brackets, e.g. )10.2(, where available. DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4* Object wellpath PMSS <0-11984'>,,35,CD#2 MWD <O-9507'>,,42PH, CD#2 MWD <8480 - 13138'>,,42,CD#2 MWD <0-???'>,,24PH,CD#2 Closest approach with 3-D Minimum Distance method Last revised Distance M.D. Diverging from M.D. IT-May-2001 )20.0( 180.0 180.0 27-May-2001 )89.5( 360.0 3322.2 31-May-2001 )89.5( 360.0 12460.0 4-Jun-2001 )86.9( 440.0 9280.0 M.D. Phillips Alaska, Inc. CD#2,33PB1 Alpine Field, North Slope, Alaska Reference wellpath CLEARANCE LISTING Page 1 Your ref : 33 PB1 Version#Ii Last revised : 5-Jun-2001 Object wellpath : PMSS <0-11984'>,,35,CD~2 T.V.D. Rect Coordinates M.D. T.V.D. 0.0 0.0 0.0S 0.0E t00.0 100.0 0.0N 0.0E 200.0 200.0 0.0N 0.0E 300.0 300.0 0.0N 0.0E 400.0 400.0 0.0N 0.0E Horiz Min'm Ellipse Rect Coordinates Bearing Dist Sep'n 0.0 0.0 20.4S 2.6E 172.8 20.6 N/A 100.0 100.0 20.5S 2.6E 172.9 20.7 )20.2( 199.9 199.9 20.9S 2.5E 173.3 21.0 )20.0( 299.9 299.9 21.6S 2.1E 174.3 21.7 )20.1( 399.8 399.8 22.5S 2.1E 174.7 22.5 )20.5( Phillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 June 18, 2001 Alaska Oil and Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 Re: Application for Permit to Drill CD2-33A RECEIVED JUN 1 9 Z001 Alaska Oil & Gas Cons. Commission Anchorage Dear Sirs: Phillips Alaska, Inc. hereby applies for a permit to ddll an onshore Alpine delineation well from the Alpine CD2 ddlling pad. The intended spud date for this well is June 30, 2001. It is intended that Doyon Rig 19 be used to drill the well. CD2-33A will be open hole sidetracked off of the existing CD2-33 wellbore. The CD2- 33A target is designed to investigate the reservoir potential of the Alpine C and A intervals midway between the CD2-33 (Alpine West) penetration and the final CD2-33B production well. CD2-33A will be plugged and abandoned prior to sidetracking to the final CD2-33B target Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: . . 5. 6. 7. 8. 9. 10. Form 10-401 APPLICATION FOR Permit to Ddll per 20 ACC 25.005 (a). Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (¢) (1). A proposed drilling program, including a request for approval of annular pumping operations. A drilling fluids program summary. Proposed pilot bore schematics. Proposed completion diagram. Proposed completion diagram with open hole isolation options. Pressure information as required by 20 ACC 25,035 (d)(2). CD2-33A Cementing Requirements. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. If you have any questions or require further information, please contact Scott Reynolds at 265-6253 or Chip Alvord at 265-6120. Scott D. Reynolds Ddlling Engineer Attachments CC.' CD2-33 Well File / Sharon AIIsup Drake Chip AIvord Cliff Crabtree Nancy Lambert Lanston Chin ATO 153O ATO 868 ATO 848 Anadarko - Houston Kuukpik Corporation e-mail: Tommy Thompson @ anadarko.com RECEIVED JUN ]_ 9 7_001 Alaska Oil & Gas Cons. CommiSsion Anchorage American Express' Cash AdVance Draft 143 Cob~o ,. Downtown, N.A. ii": pERIOO':ENoING '.:.'~]. 0 E'i, OO'hOOm. ~, 5 , , NOT VALID FOR'AMOUNT ovER'S1000' _ '. . . ":'" :':'~" "'""~" ", -" · ~,~ ,".:,:'- :' ." '.~' '. '--:,;",:: .... :?:i i '~' · ....... .%. j'i ?i~?>.',':'.L,:, ' ::.:":::~:~, ?.'?'~"::':?/.i,:/:, ~ ......... CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME CHECK 1 STANDARD LETTER DEVELOPMENT DEVELOPMENT REDRILL '~EXPLORATION-'"'x INJECTION WELL INJECTION WELL REDRILL CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) PILOT HOLE (PH) ANNULAR ~)ISPOSAL (~)~) NO ANNULAR DISPOSAL ( ) YES ANNULAR DISPOSAL THIS WELL DISPOSAL INTO OTHER ANNULUS (1~) YES + SPACING EXCEPTION "CLUE" The permit is for a new wellbore segment of existing well , Permit No, APl No. . Production should continue to be reported as a function of the original AP1 number stated above. In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and APl number (50 -70/80) from records, data and logs acquired for well (name on permit). Annular disposal has not been requested ... Annular Disposal of drilling wastes will not be approved... Annular Disposal of drilling wastes will not be approved... Please note that an disposal of fluids generated... Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order, approving a spacing exception. (Company Name)will assume the liability of any protest to the spacing exception that may occur. Phillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 June 16, 2001 Alaska Oil and Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, Alaska 99501-3539 Re: Application for Permit to Drill CD2-33, CD2-33 PB1 & CD2-33 PB2 Dear Sirs: RECEIVED JUN ] $'2001 AnChorage C°m~JSsion Phillips Alaska, Inc. hereby applies for a permit to drill an onshore production well from the Alpine CD2 drilling pad. The intended spud date for this well is June 30, 2001. It is intended that Doyon Rig 19 be used to drill the well. This well will consist of two reservoir evaluation pilot bore targets that will be abandoned and one CD2 pad horizontal development well. All 3 targets will share a common surface location and surface hole. The CD2-33PB1 is designed to penetrate the Alpine West target location that was dropped from the winter exploration drilling schedule do to this years shortened exploration season. CD2-33PB1 will be plugged and abandoned prior to sidetracking to the CD2-33PB2 target. CD2-33PB2 will be sidetracked off of the CD2-33PB1 wellbore. The CD2-33PB2 target will be used to confirm the seismic interpretation of the Northwestern portion of the Alpine reservoir within the CD2 Pad development. CD2-33PB2 will be plugged and abandoned prior to sidetracking to the final CD2-33 target The CD2-33 horizontal producer will be sidetracked through a window milled in the 9- 5/8" surface casing. After milling out a window, the 8-1/2" intermediate hole will be drilled to the 7" casing point in the Alpine reservoir. After setting 7" intermediate casing, the horizontal section will be drilled and the well completed as an open hole producer. At the end of the work program, the well will be closed in awaiting the start-up of CD2 pad, which is tentatively scheduled for August 2001. . 5. 6. 7. 8. 9. 10. Please find attached the information required by 20 ACC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 APPLICATION FOR Permit to Ddll per 20 ACC 25.005 (a). 2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1). 3. A proposed drilling program, including a request for approval of annular pumping operations. A ddlling fluids program summary. Proposed pilot bore schematics. Proposed completion diagram. Proposed completion diagram with open hole isolation options. Pressure information as required by 20 ACC 25.035 (d)(2). CD2-33PB1 & CD2-PB2 Cementing Requirements. Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b). Information pertinent to this application that is presently on file at the AOGCC is: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 ACC 25.035 (a) and (b). 2. A description of the ddlling fluids handling system. If you have any questions or require further information, please contact Scott Reynolds at 265-6253 or Chip AIvord at 265-6120. ~Scott D. Reyfiolds Drilling Engineer Attachments CC: CD2-33 Well File / Sharon AIIsup Drake Chip Alvord Cliff Crabtree Nancy Lambert LanSton Chin ATO 1530 ATO 868 ATO 848 Anadarko - Houston Kuukpik Corporation e-mail: Tom my Thompson @ anadarko.com RECEIVED JUN ~ 5'~001 ~ O~ & Gas Co~s, Commission Anchorage DUPLICATE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill X Redrill ~ lb. Type of Well Exploratory Stratigraphic Test Development Oil X Re-Entry DeepenI Service Development Gas Single Zone X Multiple Zone ,, . 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Phillips Alaska, Inc. DF 52' feet Colville River Field 3. Address 6. Property Designation Alpine Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 ADL 387207, ASRCNPRA02 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 1894' FNL, 1522' FEL SEC. 2, T11N, R4E, UM Colville River Unit Statewide At target (=7" casing point ) 8. Well number Number 1658' FNL, 1301' FEL SEC. 3, T11N, R4E, UM CD2-33, CD2-33PB1 & PB2 #U-630610 At total depth 9. Approximate spud date Amount 978' FNL, 2566' FWL SEC. 3, T11N, R4E, UM 06/30/2001 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) Property line Alpine CD2- 24 13042' MD 978' S. of Sec 34 feet 1000'@ 13042' MD Feet 2560 7267' TVD feet T12N 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 2S,03S(e)(2)) Kickoff depth 500' feet Maximum hole angle 90.21 Maximum sur~aoe 2645 pslg At total depth ('[VD) 3371 at pslg 7450' TVD.SS 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 42" 16" 62.5# H-40 Weld 77' 37' 37' 114' 114' Pre-installed 12.25" 9.625" 40# L;80 BTC 6463' 37' 37' 6500' 3730' 817 Sx Arcticset III L & 230 Sx Class G 8.5" 7" 26# L-80 BTC-M 10005' 37' 37' i0042' 7276' 138 sx Class G N/A 4.5" 12.6# L-80 IB~i.M 9468' 32' 32' 9500' 7168' Tubing 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth cS for nU (~tuUcrtaol r RECEIVED Surface Intermediate LinerPr°ducti°n J U N J. 5' Z 0 01 Perforation depth: measured true vertical Alaska Oil & Gas Cons. Commission Anchora(]e 20. Attachments Filing fee X property plat BOP Sketch Di~Terter Sketch Drilling program X Drilling fluid program X Time vs depth plot Refraction analysis Seabed report 20 AAC 25.050 requirements X 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Sig ned/'""'"--'.~.<..~{~ ~~y~_~--~/ Title Drilling Team Leader Date O~'//~/O ! Commission Use Only , Permit Number J APl number I Approval date / See cover letter for ;?_.,0/.., /2.. c-_.)I 50- /'xd~ ~- .?-.O~ ~'//I Other requirements Conditions of approval Samples required ~ No Mud log required~ No Hydrogen sulfide measures Yes ~~ Directional survey required No Required working pressure for BOPE 2M 3M 5M 10M 15M Other: by order of Approved by .... Commissioner the commission Date _ Form 10-401 Rev. 7-24-89 Sul~mit in triplicate BUPLICATE CD2-33 Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) I~-I1~" Hgle / ~-b~s" ~;as~na ~n~erv~ Event Risk Level Mitigation Strategy Oonduotor Broach Low Monitor cellar continuously during interval. Well Oollision Low N/A Gas Hydrates Low Monitor well at base of permafrost, increased mud weight, decreased mud viscosity, increased circulating times, controlled drilling rates, Iow mud temperatures Running Sands and Gravels Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps, run gravel isolation string. Abnormal Pressure in Low Diverter drills, increased mud weight Surface Formations >2000' TVD Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of Iow density cement slurries 8-1/2" Hole / CD2-33PB1 PB2 & CD2-33 7" Casinq Interval I II I Event Risk Level Mitigation Strategy Abnormal Pressure in Moderate BOPE drills, Keep mud weight above 10.4 ppg. Surface Formations Check for flow during connections and if needed, >2000' TVD increase mud weight Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud theology, lost circulation material Hole swabbing on trips Moderate Reduced trip speeds, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Abnormal Reservoir Low Well control drills, increased mud weight. Pressure Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/8" Hole/CD2-33 Horizontal Production Hole Event Risk Level Mitigation Strategy Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud theology, lost circulation material Hole swabbing on trips High Reduced trip speeds, Pump out to 7" shoe, mud properties, proper hole filling, pumping out of hole, real time equivalent circulating density (ECD) monitoring, weighted sweeps. Abnormal Reservoir Medium BOPE drills, Keep mud weight above 9.3 ppg. Pressure Check for flow during connections and if needed, increase mud weight. Well control drills, increased mud weight. Alpine formation may be abnormally pressured due to gas injection from CD1-06. Horizontal section may be depleted causing lost circulation Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers Alpine: CD2-33, CD2-33PB1 & CD2-33PB2 Summary. Procedure 1. 12-1/4" Surface Hole 1.1. Install diverter. Move on Doyon 19 & RU mud loggers. Function test diverter. 1.2. Drill 12 1/4 inch hole to the surface casing point ~ +/-6500' MD per the directional plan. Mud log entire section. 1.3. Run 9 5/8 surface casing with TAM port collar placed at +/- 1000' MD from surface. Cement 9-5/8" casing. 1.4. Install and test BOPE to 5000 psi. 1.5. Pressure test casing to 2500 psi. 2.CD2-33PB1 (Alpine West) 8-1/2" Hole Section. 2.1. Mud log entire 8-1/2" hole section. 2.2. With AutoTrak (GR/Res), drill out 20' of new hole. Perform leak off test. Maximum 16 ppg EMW. 2.3. Drill 8 1/2" hole to the K1 at +/- 20151' MD. 2.4. POOH and PU Inteq mud motor & Anadrill MWD/LWD (GR/Res/Neut/Den). RIH to +/- 20151'Drill to TD of CD2-33PB1 (Alpine West) ~ 21417' MD. POOH and prep for plug back. 2.5. RIH with 3-1/2" x 5" tapered drill string with mule shoe. 2.6. Set 1st balanced cement plug from 21417' to 20883'. POOH to 20883' and circulate clean. 2.7. Pump 2na balanced cement plug. POOH to 20683' and circulate clean. 2.8. POOH to7400 and lay in hi-vis pill to 7300' MD Pump 3~d balanced cement plug (kick-off plug) and POOH to 6800'. Circulate hole clean and POOH for sidetrack CD2-33PB2. 3. CD2-33PB2 8-1/2" Hole Section. 3.1. PU standard Alpine directional drilling BHA. Inteq/Anadrill w/(GR/RES/NEUT/DENS) 3.2. RIH with drilling assembly. Dress-off plug #3. Kick off at +/- 7000' h/fi)and drill sidetrack to TD ~ approximately 15339' MD. POOH. 3.3. RIH with 3-1/2" x 5" tapered drill string with mUle shoe. 3.4. Set 1st balanced cement plug from 15339' to 7502'. POOH to 7502' and circulate clean. 3.5. POOH and PU cement retainer. RIH to no less than 50' above, or no more than 100' above the shoe. Set retainer at approximately 6450' MD. 3.6. By the down squeeze method pump sufficient cement through the retainer to extend 150' below (50' of casing volume plus 100' of 8.5" open hole volume plus 50 % excess). Lay a 50' cement cap on top of the retainer. (Weight test retainer before pumping cement job) 3.7. POOH to 300' MD. Pressure test plug to 1500 psi for 30 minutes. POOH for CD2-33 Sidetrack. 4. CD2-33 8-1/2" intermediate hole and 6-1/8" horizontal production hole. 4.1. RIH with casing scraper or gauge ring mn on e-line to insure the casing is free of obstructions. 4.2. RU E-line and RIH with a bridge plug on a setting tool and GR/CCL. Log from 200' below to 200' above the planned bridge plug setting depth ~ +/- 3862' MI2). 4.3. Set Bridge plug. Shut in well and test casing to 3500 psi for 30 minutes. 4.4. MU 9-5/8" Whipstock Assembly and RIH w/MWD to setting depth ~ 3862' MD. Orient whipstock and set. 4.5. Mill window in casing and approximately 38' of new hole. Perform FIT to maximum 16 ppg EMW. POOH for drilling assembly. 4.6. PU standard Alpine 8-1/2" drilling assembly with GR/Res and RIH. 4.7. Drill 8-1/2" hole to 7" casing point @ 10041' ME). POOH to nm casing. 4.8. Run and cement 7 inch casing as per program. Top of cement + 500 feet MD above Alpine reservoir. Carry out a leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing shoe. Freeze protect casing annulus and casing. 4.9. BOPE test to 5000 psi. 4.10. Run drilling assembly. Pressure test casing to 3500 psi. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable leak off for drilling ahead is 11.5 ppg EMW. 4.11. Drill 6 1/8" horizontal section to well TD ~ 13042' MD. 4.11.1. Contingency - set open hole isolation equipment if required (due to unconsolidated formation or wellbore having moved out of the Alpine reservoir sand). 4.12. Displace well to brine and pull out of hole. 4.13. Run 4 %, 12.6#, L-80 IBT-Mod tubing with SSSV nipple, gas lift mandrels and production packer. Land hanger. 4.14. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 4.15. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check. 4.16. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi / 30 mins. 4.17. Shear out valve in lowermost gas lift mandrel. Circulate tubing to diesel and install freeze protection in the annulus. 4.18. Set BPV and secure well. Move rig off. Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in following attachments. CD2-33 will be the closest well to CD2-42PH. Accounting for survey tool inaccuracies, the ellipse separation between these wells will be 13.6' at 8800' MD. Drillinq Area Risks: There are no high-risk events (e.g. over-pressures zones) anticipated. Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost circulation. Standard LCM material has proved effective in dealing with lost circulation in previous development wells. Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed kicks. Annular Pumpinq Operations: Incidental fluids developed from drilling operations on well CD2-33 will be disposed of into the annulus of another permitted well on the CD2 pad or the CD1-19a Class II disposal well. This well will not be permitted for annular disposal. CD2-33 & CD2-33 PBI&2 DRILLING FLUID PROGRAM SPUD to Intermediate hole to 7" Production Hole 9-5/8"surface casing casing point - 8 Y2" Section - 6 1/8" point- 12 N" Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 9.2 ppg PV 10 - 25 10 -15 YP 20 - 60 15 - 25 25 - 30 Funnel Viscosity 100 - 200 Initial Gels 4 - 8 10 - 15 10 minute gels <18 12 - 20 APl Filtrate NC - 10 cc / 30 min 4 - 12 cc/30 min (drilling) HPHT Fluid Loss at 12 - 14 cc/30 min 160 8.5 - 9.0 9.0 - 10.0 9.0 - 9.5 PH 6 % KCL Surface Hole: A standard high viscosity fresh water / gel spud mud is recommended for the surface interval. Keep flowline viscosity at _+ 200 sec/qt while drilling to the base of the permafrost. Lower viscosity to 90 sec/qt from the base of the permafrost to TD of the surface hole. Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary. Intermediate Hole Sections CD2-33PB1, PB2 & CD2-33: Fresh water gel / polymer mud system. Ensure good hole cleaning by maintaining fluid rheology and maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of Iow drill solids (by diluting as required) will all be important in maintaining wellbore stability. Production Hole Section: The horizontal production interval will be drilled with a M-I FIo-Pro drill-in fluid. The base fluid will consist of 6% KCl, with _+ 30PPB calcium carbonate bridging material to minimize formation damage. FIo-Vis Polymer and DuaI-FIo starch will be used for viscosity and fluid loss control respectively. { .... Colville River Field CD2-33PB1 (Alpine West) - Prior to Sidetracking RKB - GL: 37' Updated 06/1 1/2001 Wellhead 16' Conductor to 114' 9-5/8" 40 ppf L-80 BTC Surface Casing @ 6500' MD / 3730' TVD cemented to surface Top of cement plug #3 (kick-off plug) dressed off to 7000' MD / 3857' TVD (+/- 75.350 inc.) 9.8 ppg drilling mud in hole I Top Alpine Reservoir at 20883' MD / 7367' TVD CD2-33PB1 Hole TD at 21417' MD / 7502' TVD (+/- 750 inc.) cement Plug 500 ft Top of Cement Plug #3 at +/- 6800' Bottom of Cement Plug #3 at +/- 7300' 200 ft Top o! Cement Plug #2 at +/- 20683' 200' Above top of Alpine. 100' excess coverage over the required 100' Per AOGCC 20 AAC 25.107 & 25.112 Top of Cement Plug #1 at +/- 20883' 534 ft Colville River Field CD2-33PB2 - Prior to Sidetracking to CD2-33 RKB - GL = 37' Updated 06/15/2001 Wellhead 16' Conductor to 114' Top of Whip Stock at +/- 3832' MD Bridge Plug set @ 3862' MD 9-5/8" 40 ppf L-80 BTC Surface Casing @ 6500' MD / 3730' TVD cemented to surface Cement Retainer set @ 6450' MD 9.8 ppg drilling mud in hole I Top Alpine Reservoir at 14975' MD / 7339' TVD CD2-33PB2 Hole TD at 15339' MD /7502' TVD (+/- 75o inc.) Cement Plug Top of Cement Plug #2 at +/- 6400' Per AOGCC 20 AAC 25.107 & 25.112 (b)(1) Plug #2: Volumes Based on Casing Capacity & 50% excess in open hole Cement with Class G + additives @ 15.8 ppg. Slurry: 100' X 0.4340 ft3/ft = 44 ft3 100' X 0.3941 ft3/It x 1.5 = 60 ft3 44 ft3 + 60 ft3 = 104 ft3 => 89 Sx @ 1.17 ft3/sk Bottom of Cement Plug #2 at +/- 6600'  Top of Cement Plug #1al +/- 14775' 200' Above top ol Alpine, 100' excess coverage over the required 100' $64 ft Per AOGCC 20 AAC 25,107 & 25.112 (a)(1) Colville River Field CD2-33 Production Well Completion Plan ,~,,, ~ ;~,, ~ 6/14/01 U dated iii i ii! i 16" Conductor to 114' P ¢~!!;i':~ii~ i~i~i~i~i: 4-1/2 Camco BAL-O SSSV N~pple (3.812 ID) at2000 TVD=2050 MD Ii il I ['-1 I Ii - ,~o~,o~ SloeYe with DB-6 No-Go Lock (3.812 OD)run in profile [!lii!tl~'~'""~ ] [ I[ [~ ...... ~],~ Dual 1/4" x 0.049" sis control lines Window ~Hod m sur .co Casing Camco KBG-2 GLM (3.909' ID) at 3400' TVD for E Dummy with 1" BK-2 Latch 4-1/2" 12.6 ppf L-80 IBT Mod. R3 tubing run with Jet Lube Run'n'Seal pipe dope WROP-2 SSSV (2.125"1D) w/DB-6 No-Go Lock (3.812" OD) - to be installed later Pecker Fluid mix: 9.6 ppg KCI Brine with 2000' TVD diesel cap Tubing Suoended with diesel to lowest GLM Start thermal centralizers. 1 per joint from 4500' TVD to 2400' TVD Camco KBG-2 GLM (3.909" ID) at 5200' TVD for E Dummy with 1" BK-2 Latch \ \ \ \ & 1" Camco DCK-2 Shear Valve \ \ \ \Pinned for casing side shear @ +/- 2000 psi ~~~nts above the X landing nipple ~ . ..~>,, Baker 83 Packer at +/- 9444' .... .: :.:: .?~. TOC e +/- 9249' MD (500' MD above top Alpine) Top Alpine at 9749' MD / 7252' TVD Completion MD 'EVE) Tubing Hanger 32' 32' 4-1/2", 12.6#/ft, IBT-Mod Tubing Camco BAL-O SSSV Nipple 2050' 2000' End thermal centralizers 2527' 2400' 4-1/2", 12.6#/ft, IBT-Mod Tubing Camco KBG-2 GLM (3.909" ID) 4621' 3400' 4-1/2", 12.6#/ft, IBT-Mod Tubing Start thermal centralizers, 6050' 4500' (1 per joint) Camco KBG-2 GLM (3.909" ID) 6915' 5200' 4-1/2", 12.6#/ft, IBT-Mod Tubing Camco KBG-2 GLM (3.909" ID) 9820' 4-1/2" tubing joints (2) (R3) HES "X" (3.813" ID) 9902' 4-1/2" tubing joint (1)(R3) Baker S3 Packer 9444' 4-1/2" tubing joint (1)(R3) HES "XN" (3.725" ID) 9489' 4-1/2" 10' pup joint WEG (+/- 65.1 deg) 9500' 7168' Well TD at 13042' M D / 7267' TVD 7" 26 ppf L-80 BTC Mod Production Casing @ 10042' MD / 7276' TVD @ 90.21 deg Colville River Field CD2-33 Production Well Completion Plan Formation Isolation Contingency Options 16" Conductor to 114' 4-1/2" Camco BAL-O SSSV Nipple (3.812" ID), WRDP-2 SSSV (2.25" ID) and DB-6 No-Go Lock (3,812" OD) with dual 1/4" x 0,049" s/s control line @ 2OOO' TVD Window Milled in 9-5/8" 40 ppf L-80 BTC Surface Casing @ 3832' MD / 3055' TVD Camco KBG-2 GLM (3.909" ID) at 3400' TVD for E Dummy with 1" BK-2 Latch 4-1/2" 12.6 ppf L-80 IBT Mod, R3 tubing run with Jet Lube Run'n'Seal pipe dope Start thermal centralizers. 1 per joint from 4500' TVD to 2400' TVD Camco KBG-2 GLM (3.909" ID) at 5200' TVD for E Dummy with 1" BK-2 Latch Updated 06/1 4/01 (A) Bonzai ECP Assembly - Baker ZXP Packer (4.75" ID) - Baker HMC Liner Hanger - XO to IBT-Mod - blank 4-1/2" joints (TBD) Cementing Valve - Baker Payzone ECP (mud inflated) -Landing Collar - 4-1/2" joint (1- 2) blank - Guide Shoe (B) O_oen Hole Scab Liner - Baker Payzone ECP (cement inflated) - 4-1/2" joints (TBD) blank tbg - Baker Payzone ECP (cement inflated) - Baker Model XL-IO ECP (anchor) - Muleshoe / Entry Guide (C) Open Hole Bridge Plug Assembly Baker Payzone ECP (cement inflated) -XO -Float Collar - 4-1/2" Float Shoe \ \ \ \ & 1" Camco DOK-2 Shear Valve \ \ \ ~ Pinned for casing side shear e 2000 psi ~X~.~~2 j°ints ab°ye the X landing nipple , ~.~ ~,.~~. ~~. ~i~:.,.;Baker S3 Packer at +/-9444 Alpine) .... ~.. Well TD at 13042' MD I 7267' TVD 7" 26 ppf L-80 BTC Mod Production Casing @ 10042' MD / 7276' TVD @ 90.21 deg CD2-33 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well · Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114/114 10.9 52 53 9 5/8 Window 3832 / 3055 14.5 1383 (0.4525 psi/ft)1998 7" 10042 / 7287 16.0 3298 (0.4525 psi/ft)2565 N/A 13042 / 7276 16.0 3293 (0.4525 psi/ft)N/A · NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - 0.1ID Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP= FPP - (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point . ASP CALCULATIONS Drilling below conductor casing (16") ASP = ... ASP = [(FG x 0.052)-0.1} D [(10.9 x 0.052) - 0.1] x 114 = 53 psi OR FPP - (0.1 x D) = 1383 - (0.1 x 3055') = 1078 psi 2. Drilling below surface casing (9 5/8" Window) ASP = [(FG x 0.052)- 0.1} D = [(14.5 x 0.052) - 0.1] x 3055 = 1998 psi OR ASP = FPP - (0.1 x D) = 3298 - (0.1 x 7287') = 2569 psi 3. Drilling below intermediate casing (7") ASP = FPP - (0.1 x D) = 3293 - (0.1 x 7276') = 2565 psi CD2-33PB1 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well - Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114/114 10.9 52 53 9 5/8 6500 / 3730 14.5 1688 (0.4525 psi/ft)2440 8-1/2" hole TD 21417 / 7502 16.0 3395 (~0.4525 psi/ft) N/A · NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 3) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 4) ASP= FPP- (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 2. Drilling below conductor casing (16") ASP = [(FG x 0.052) - 0.1} D = [(10.9 x 0.052) -0.1] x 114 = 53 psi OR ASP = FPP - (0.1 x D) = 1688- (0.1 x 3730') = 1315 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052) - 0.1} D = [(14.5 x 0.052) - 0.1] x 3730' = 2440 psi OR ASP = FPP- (0.1 x D) = 3395- (0.1 x 7502') = 2645 psi CD2-33PB2 PRESSURE INFORMATION AND CASING DESIGN (per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well · Casing Size Csg Setting Fracture Pore pressure ASP Drilling (in) Depth Gradient (lbs./ (psi) (psi) MD/TVD(ft) gal) 16 114/114 10.9 52 53 9 5/8 6500 / 3730 14.5 1688 (0.4525 psi/ft)2440 8-1/2" hole TD 15339 / 7502 16.0 3395 (0.4525 psi/ft)N/A · NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to 5000 psi. PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 5) ASP = [(FG x 0.052) - 0.1]D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb./gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 6) ASP= FPP - (0.1x D) Where; FPP = Formation Pore Pressure at the next casing point ASP CALCULATIONS 3. Drilling below conductor casing (16") ASP = [(FG x 0.052)-0.1} D = [(10.9 x 0.052)- 0.1] x 114 = 53 psi OR ASP = FPP- (0.1 x D) = 1688 - (0.1 x 3730') = 1315 psi 2. Drilling below surface casing (9 5/8") ASP = [(FG x 0.052)-0.1} D = [(14.5 x 0.052) - 0.1] x 3730' = 2440 psi OR ASP = FPP - (0.1 x D) = 3395 - (0.1 x 7502') = 2645 psi Alpine, CD2-33PB1 Cementinq Requirements CD2-33PB1 Cement Plug #1: 21417' MD to 20883' MD = 534'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 534' X 0.3941 ft3/ft X 1.15 (15% excess) = 242 ft3 => 210 Sx @ 1.16 ft3/sk CD2-33PB1 Cement Plug ~2: 20883' MD to 20683' MD = 200'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume, Slurry: 200'X 0.3941 ft~/ft X 1.15 (15% excess) = 90.6 ft~ => 80 sx @ 1.16 ft~/sk CD2-33PB1 Cement Plug #3 (Kick-Off Plug): 7300' MD to 6800' MD -- 500'. Cement with Class G + additives @ 17 ppg. Assume 15% excess on open hole volume. Slurry: 500'X 0.3941 ft~/ft X 1.15 (15% excess) = 227 ft3 => 227sx @ 1.00 ft~/sk Alpine, CD2-33PB2 Cementin.q Requirements CD2-33PB2 Cement Plug #1: 15339' MD to 14775' MD = 564'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 564' X 0.3941 ft~/ft X 1.15 (15% excess) = 256 ft3 => 220 Sx @ 1.16 ft3/sk CD2-33PB2 Cement Plug ~2 · 6600' MD to 6400' MD = 200'. Cement with Class G + additives @ 15.8 ppg. Assume 15% excess on open hole volume. Slurry: 200' X 0.3941 ft3/ft X 1.15 (15% excess) = 90.6 ft3 => 80 sx @ 1.16 ft3/sk Phillips Alaska, Inc. Structure: CD#2 Well: $3PB1 field: Alpine Field Location: North Slops, Alaska <- West (feet) 17600 16800 16000 15200 1~400 13600 12800 12000 11200 10400 9600 8800 8000 7200 6400 5600 4800 4000 3200 2400 1600 800 0 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 248.33 AZIMUTH 75' (TO PB1 TARGET) ***Plane of Proposal*** g78' FNL, 2586' FWL I\ SEC. ;3, T11N, R4E I -~ I LO~ON: I 165a' ~ 13o1' ~L I Torget - EOC - Csg TRUE CD2-33PB1 TARGET LOCATION: 1933' FSL, 2579' FEL SEC. 8, T11N, R4E Ibian-g8 .,ach A CD2-33PB1TD LOCATION: 1741' FS¼ 2221'FWL SEC. 8, T11N, R4E CD2-33PB2 TARGET I LOCATION: I 15¢g' FSI_, 82' FELI SEC. g, T11N, R4E I ( d~l~Plnl~ u . . L~'-~ uJrgo~ :- ~pmne CD2-33PB2TD LOCATION: 1297'FS~ 289'FEL SEC. 9, T11N, R4E 1690 1600 24O0 5200 58O0 840O 7200 8000 Phillips Alaska, Inc. Structure : CD#2 Well : 33 Field: Alplne Field Location: North Slope, Alaska 2700 - 3000 33OO 3600 3900 42O0 45OO 4800 §100 54OO 5700. 600O 63OO 6600 69OO 72O0 7500. 7800 73.56 67.54 61.74 55.96 50.21 44.51 41.68 ,38.87 K-2 - Sidetrack Pt. DIS: 3.00 deg per 100 ft 9 5/8 Casing 331.86 AZIMUTH Albian-97 Nbian-96 TANGENT ANGLE 36.06 DEG 3580~ Begin Final BId~Trn 35192~ 36.8B~ DIS: 6.00 deg per 100 ft 38.64), 4,.o9,. ~,~ TARGET ANGLE 44.10~, HRZ 47.5~ . ~" 90.21 DEG 51.41"'~ K-1 ..~' 59.85-~ Leu ,,.,,?;~,~.~,~e ~" 83.33 I i i i i 300 0 300 i i i i i i i i i i i i i i i i i i i i 600 900 1200 1500 1800 21 O0 2400 2700 3000 3300 Vertical Section (feet) -> Azimuth 331.86 with reference 0.00 S, 0.00 E from slot #33 i i I I 3600 3900 Phillips Alaska, Inc. Structure: CD#2 Well : 55 Field: Alpine Field Location : North Slope, Alaska PROFILE Point MD Inc KOP - Sidetrack Pt. 3831.77 75.35 EOC 5201.27 36.06 K-3 5247.04 56.06 K-2 5519.17 36.06 Albion-97 7117.32 36.06 Albion-9 6 7959.90 36.06 Begin Final BId/Trn 8452.31 36.06 HRZ 9001.20 44.1 4 K-1 9195.49 51.25 LCU 9426.70 61.04 Miluveach A 9628.08 70.30 Alpine D 9675.1 4 72.52 Alpine 9748.97 76.04 Target- EOC - Csg P 10041.37 90.21 COMMENT DATA Dir TVD North East 248.33 3055.44 -619.52 - 1559.59 255.05 5815.00 -1128.41 -2539.51 255.05 3852.00 -11 44.60 -2561.04 235.05 4072.00 -1240.89 -2689.03 255,05 5564.00 - 1806.59 -5440.72 255.05 6029.00 -2097.45 -5827.62 255.05 6445.25 -2278.77 -4068.64 285.85 6874.00 -2551.64 -4592.27 296.59 7005.00 -2281.63 -4526.26 508.24 7154.00 -2178.46 -4687.24 51 6.77 7217.00 -2054.40 -4821.86 518.61 7252.00 -2021.41 -4851.88 521.40 7252.00 - 1966.97 -4897.55 551.86 7287.00 -1725.26 -5056.25 V. Sect 189.16 202.68 198.55 174.00 29.87 -44.32 -90.55 15.48 122.77 289.67 462.56 505.80 575.34 863.32 Deg/1 O0 0.00 3.00 0.00 0.00 0.00 0.00 0.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 TD - Csq Pt. 15041.71 90.21 551.86 7276.00 920.41 -6471.27 5865.64 0.00 Phillips Alaska, Inc. Sfrucfure: CD#2 Well: 33 Field: Alpine Field Loooflon : Norfh Slope, 1900 310 340 17OO TRUE NORTH 350 0 10 2O 210 30 32O 40 5O 3OO 6O 290 7O 280 8O 270 2 0 90 26O 100 25O 110 240 120 230 130 220 140 210 150 200 160 1 goo 180 170 Normal Plane Travelling Cylinder- Feet All depths shown are Measured depths on Reference Well CD2-33 HOI~ JNTAL PRODUCER STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 Version#11 Our ref : prop4577 License : Date printed : 5-Jun-2001 Date created : 20-Mar-2001 Last revised : 4-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone ~, Spheroid: Clarke - 1866 Reference North is True North CD2~33 HOI~, JNTAL PRODUCER STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33 Alpine Field,North Slope, Alaska Measured Inclin. Depth Degrees 0.00 0.00 100.00 0.00 200.00 0.00 300.00 0.00 400.00 0.00 500.00 0.00 600.00 1.00 700.00 2.00 800.00 3.00 900.00 4.00 1000.00 6.00 1100.00 8.00 1200.00 10.00 1300.00 12.00 1400.00 14.00 1500.00 16.00 1600.00 18.00 1700.00 20.00 1800.00 22.00 1900.00 24.00 2000.00 26.00 2100.00 28.00 2200.00 30.00 2299.99 33.00 2399.99 36.00 2499.99 39.00 2599.99 42.00 2699.99 45.00 2799.99 48.00 2899.99 51.00 2999.99 54.00 3099.99 57.00 3199.99 60.00 3299.99 63.00 3399.99 66.00 3499.99 69.00 3599.99 72.00 3699.99 75.00 3711.77 75.35 3831.77 75.35 3900.00 73.36 4000.00 70.45 4100.00 67.54 4200.00 64.64 4300.00 61.74 4400.00 58.84 4500.00 55.96 4600.00 53.08 4700.00 50.21 4800.00 47.35 Azimuth True Vert R E C T A N G U L A R Degrees Depth C O O R D I N A T E S 0.00 0.00 0.00S 0.00 248.33 100.00 0.00S 0.00 248.33 200.00 0.00S 0.00 248.33 300.00 0.00S 0.00 248.33 400.00 0.00S 0.00 248.33 500.00 0.00S 0.00 248.33 599.99 0.32S 0.81 248.33 699.96 1.29S 3.24 248.33 799.86 2.90S 7.30 248.33 899.68 5.15S 12.97 248.33 999.29 8.37 S 21.07 248.33 1098.54 12.87S 32.40 248.33 1197.30 18.65S 46.93 248.33 1295.46 25.69S 64.66 248.33 1392.89 34.00S 85.57 248.33 1489.48 43.55S 109.62 248.33 1585.11 54.34S 136.79 248.33 1679.65 66.36S 167.05 248.33 1773.01 79.60S 200.35 248.33 1865.05 94.02S 236.66 248.33 1955.68 109.62S 275.93 248.33 2044.77 126.38S 318.12 248.33 2132.23 144.28S 363.18 248.33 2217.48 163.57S 411.73 248.33 2299.88 184.48S 464.36 248.33 2379.21 206.95S 520.93 248.33 2455.24 230.93S 581.27 248.33 2527.77 256.34S 645.24 248.33 2596.60 283.12S 712.64 248.33 2661.54 311.19S 783.30 248.33 2722.41 340.48S 857.02 248.33 2779.04 370.90S 933.60 248.33 2831.29 402.38S 1012.83 248.33 2879.00 434.82S 1094.50 248.33 2922.04 468.14S 1178.37 248.33 2960.31 502.25S 1264.22 248.33 2993.69 537.05S 1351.81 248.33 3022.09 572.45S 1440.91 248.33 3025.10 576.65S 1451.49 248.33 3055.44 619.52S 1559.39 247.83 3073.84 644.04S 1620.34 247.07 3104.89 680.49S 1708.12 246.28 3140.73 717.44S 1793.84 245.46 3181.25 754.79S 1877.26 244.60 3226.35 792.45S 1958.17 243.69 3275.91 830.32S 2036.33 242.73 3329.78 868.27S 2111.53 241.69 3387.82 906.22S 2183.56 240.58 3449.87 944.06S 2252.23 239.37 3515.76 981.68S 2317.35 PROPOSAL LISTING Page 1 Your ref : 33 Version~ll Last revised : 4-Jun-2001 Dogleg Vert Deg/100ft Sect E 0.00 0.00 E 0.00 0.00 E 0.00 0.00 E 0.00 0.00 E 0.00 0.00 E 0.00 0.00 W 1.00 0.10 W 1.00 0.39 W 1.00 0.89 W 1.00 1.57 W 2.00 2.56 W 2.00 3.93 W 2.00 5.69 W 2.00 7.84 W 2.00 10.38 W 2.00 13.30 W 2.00 16.59 W 2.00 20.26 W 2.00 24.30 W 2.00 28.71 W 2.00 33.47 W 2.00 38.59 W 2.00 44.06 W 3.00 49.94 W 3.00 56.33 W 3.00 63.19 W 3.00 70.51 W 3.00 78.27 W 3.00 86.45 W 3.00 95.02 W 3.00 103.96 W 3.00 113.25 W 3.00 122.86 W 3.00 132.77 W 3.00 142.94 W 3.00 153.36 W 3.00 163.98 W 3.00 174.79 W 3.00 176.07 W 0.00 189.16 W 3.00 196.28 W 3.00 205.54 W 3.00 213.39 W 3.00 219.79 W 3.00 224.74 W 3.00 228.22 W 3.00 230.21 W 3.00 230.72 W 3,00 229.75 W 3.00 227.28 KOP - Sidetrack Pt. Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 6536.41 on azimuth 278.10 degrees from wellhead. Total Dogleg for wellpath is 211.78 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.86 degrees. Calculationuses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33 HO~,,.ONTAL PRODUCER STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 2 Your ref : 33 Version#Il Last revised : 4-Jun-2001 Measured Inclin. Azimuth True Vert R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/100ft Sect 4900.00 44.51 238.04 3585.31 1018.98S 2378.74W 3.00 223.35 5000.00 41.68 236.57 3658.33 1055.86S 2436.24W 3.00 217.94 5100.00 38.87 234.92 3734.62 1092.22S 2489.67W 3.00 211.08 5200.00 36.09 233.07 3813.97 1127.96S 2538.91W 3.00 202.79 5201.27 36.06 233.05 3815.00 1128.41S 2539.51W 3.00 202.68 5247.04 36.06 233.05 3852.00 1144.60S 2561.04W 0.00 198.55 5500.00 36.06 233.05 4056.50 1234.11S 2680.02W 0.00 175.73 5519.17 36.06 233.05 4072.00 1240.89S 2689.03W 0.00 174.00 6000.00 36.06 233.05 4460.72 1411.03S 2915.19W 0.00 130.64 6500.00 36.06 233.05 4864.94 1587.95S 3150.37W 0.00 85.54 7000.00 36.06 233.05 5269.15 1764.88S 3385.54W 0.00 40.45 7117.32 36.06 233.05 5364.00 1806.39S 3440.72W 0.00 29.87 7500.00 36.06 233.05 5673.37 1941.80S 3620.72W 0.00 -4.64 7939.90 36.06 233.05 6029.00 2097.45S 3827.62W 0.00 -44.32 8000.00 36.06 233.05 6077.59 2118.72S 3855.89W 0.00 -49.74 8452.31 36.06 233.05 6443.25 2278.77S 4068.64W 0.00 -90.53 8500.00 35.80 237.90 6481.87 2294.62S 4091.67W 6.00 -93.65 8600.00 35.92 248.15 6562.99 2321.10S 4143.73W 6.00 -92.45 8700.00 36.88 258.14 6643.55 2338.20S 4200.37W 6.00 -80.81 8800.00 38.64 267.52 6722.67 2345.72S 4260.99W 6.00 -58.86 8900.00 41.09 276.07 6799.48 2343.60S 4324.92W 6.00 -26.83 9000.00 44.10 283.75 6873.14 2331.84S 4391.45W 6.00 14.92 9001.20 44.14 283.83 6874.00 2331.64S 4392.27W 6.00 15.48 9100.00 47.57 290.57 6942.84 2310.58S 4459.87W 6.00 65.93 9195.49 51.23 296.39 7005.00 2281.63S 4526.26W 6.00 122.77 9200.00 51.41 296.65 7007.82 2280.06S 4529.42W 6.00 125.64 9300.00 55.52 302.09 7067.37 2240.60S 4599.33W 6.00 193.41 9400.00 59.85 307.00 7120.83 2192.64S 4668.84W 6.00 268.49 9426.70 61.04 308.24 7134.00 2178.46S 4687.24W 6.00 289.67 9500.00 64.36 311.49 7167.62 2136.70S 4737.20W 6.00 350.05 9600.00 68.98 315.65 7207.23 2073.40S 4803.65W 6.00 437.21 9628.08 70.30 316.77 7217.00 2054.40S 4821.86W 6.00 462.56 9675.14 72.52 318.61 7232.00 2021.41S 4851.88W 6.00 505.80 9700.00 73.71 319.56 7239.22 2003.43S 4867.46W 6.00 529.00 9748.97 76.04 321.40 7252.00 1966.97S 4897.53W 6.00 575.34 9800.00 78.50 323.29 7263.24 1927.56S 4927.93W 6.00 624.43 9900.00 83.33 326.88 7279.04 1846.62S 4984.41W 6.00 722.44 10000.00 88.19 330.41 7286.42 1761.49S 5036.26W 6.00 821.96 10041.37 90.21 331.86 7287.00 1725.26S 5056.23W 6.00 863.32 10041.39 90.21 331.86 7287.00 1725.25S 5056.24W 6.00 863.34 10500.00 90.21 331.86 7285.32 1320.85S 5272.54W 0.00 1321.95 11000.00 90.21 331.86 7283.49 879.95 S 5508.35W 0.00 1821.95 11500.00 90.21 331.86 7281.65 439.06 S 5744.16W 0.00 2321.94 12000.00 90.21 331.86 7279.82 1.84 N 5979.98W 0.00 2821.94 12500.00 90.21 331.86 7277.99 442.73 N 6215.79W 0.00 3321.94 13000.00 90.21 331.86 7276.15 883.63N 6451.60W 0.00 3821.93 13041.71 90.21 331.86 7276.00 920.41N 6471.27W 0.00 3863.64 13041.73 90.21 331.86 7276.00 920.43N 6471.28W 0.00 3863.67 EOC K-3 K-2 Albian-97 Albian-96 Begin Final Bld/Trn HRZ K-1 LCU Miluveach A Alpine D Alpine Target - EOC - Cst Pt CD2 Tgt52 Heel Rvsd 26-Oct-00 TD -Csg Pt. CD2 Tgt52 Toe Rvsd 26-Oct-00 Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 6536.41 on azimuth 278.10 degrees from wellhead. Total Dogleg for wellpath is 211.78 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.86 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 Version#Il Last revised : 4-Jun-2001 Comments in wellpath MI) TVD Rectangular Coords. Comment 3831.77 3055.44 619.52 S 1559 39 W KOP - Sidetrack Pt. 5201.27 3815.00 1128.41 5247,04 3852.00 1144.60S 5519.17 4072.00 1240.89S 7117.32 5364.00 1806.39S 7939.90 6029.00 2097.45S 8452.31 6443.25 2278.77S 9001.20 6874.00 2331.64S 9195.49 7005.00 2281.63S 9426.70 7134.00 2178.46S 9628.08 7217.00 2054.40S 9675.14 7232.00 2021.41S 9748.97 7252.00 1966.97S 10041.37 7287.00 1725.26S 10041.39 7287.00 1725.25S 13041.71 7276.00 920.41 N 13041.73 7276.00 920.43 N 2539 2561 2689 3440 3827 4068 4392 4526 26 4687 24 4821 86 4851 88 4897 53 5056 23 5056 24 6471.27 6471.28 51 W EOC 04 W K-3 03 W K-2 72 W Albian-97 62 W Albian-96 64 W Begin Final Bld/Trn 27 W }{RZ W K-1 W LCU W Miluveach A W Alpine D W Alpine W Target - EOC - Cst Pt W CD2 Tgt52 Heel Rvsd 26-0ct-00 W TD - Cst Pt. W CD2 Tgt52 Toe Rvsd 26-Oct-00 Casing positions in string 'A' Top MD Top TVD Rectangular Coord$. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 4864.94 1587.95S 3150.37W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised CD2 Tgt52 Heel Rvsd 366631.000,5972824.000,0.0000 7287.00 1725.25S 5056.24W 15-Oct-1997 CD2 Tgt52 Toe Rvsd 2 365261.000,5975493.000,2.0000 7276.00 920.43N 6471.28W 15-Oct-1997 CD2-33 HOR,,.ONTAL PRODUCER COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 Version#11 Our ref : prop4577 License : Date printed : 5-Jun-2001 Date created : 20-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection tyl~e: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33 HO~,,__,ONTAL PRODUCER COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page Your ref : 33 Version~ll Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O O R D S G E O G R A P H I C Depth Degrees Degrees Depth C O O R D I N A T E S Easting Northing C O O R D I N A T E $ 0.00 0.00 0.00 0.00 0.00S 100.00 0.00 248.33 100.00 0.00S 200.00 0.00 248.33 200.00 0.00S 300.00 0.00 248.33 300.00 0.00S 400.00 0.00 248.33 400.00 0.00S 500.00 0.00 248.33 500.00 0.00S 600.00 1.00 248.33 599.99 0.32S 700.00 2.00 248.33 699.96 1.29S 800.00 3.00 248.33 799.86 2.90S 900.00 4.00 248.33 899.68 5.15S 1000.00 6.00 248.33 999.29 8.37S 1100.00 8.00 248.33 1098.54 12.87S 1200.00 10.00 248.33 1197.30 18.65S 1300.00 12.00 248.33 1295.46 25.69S 1400.00 14.00 248.33 1392.89 34.00S 1500.00 16.00 248.33 1489.48 43.55S 1600.00 18.00 248.33 1585.11 54.34S 1700.00 20.00 248,33 1679.65 66.36S 1800.00 22.00 248.33 1773.01 79.60S 1900.00 24.00 248.33 1865.05 94.02S 2000.00 26.00 248.33 1955.68 2100.00 28.00 248.33 2044.77 2200.00 30.00 248.33 2132.23 2299.99 33.00 248.33 2217.48 2399.99 36.00 248.33 2299.88 2499.99 39.00 248.33 2379.21 2599.99 42.00 248.33 2455.24 2699.99 45.00 248.33 2527.77 2799.99 48.00 248.33 2596.60 2899,99 51.00 248.33 2661.54 2999.99 54.00 248.33 2722.41 3099.99 57.00 248,33 2779.04 3199.99 60.00 248,33 2831.29 3299.99 63.00 248.33 2879.00 3399.99 66.00 248.33 2922.04 3499.99 69.00 248.33 2960.31 3599.99 72.00 248.33 2993.69 3699.99 75.00 248.33 3022.09 3711.77 75.35 248.33 3025.10 3831.77 75.35 248.33 3055.44 3900.00 73.36 247.83 3073.84 4000.00 70.45 247.07 3104.89 4100.00 67.54 246.28 3140.73 4200.00 64.64 245,46 3181.25 4300.00 61.74 244.60 3226.35 4400.00 58.84 243.69 3275.91 4500,00 55.96 242.73 3329.78 4600.00 53.08 241.69 3387.82 4700.00 50.21 240.58 3449.87 4800.00 47.35 239.37 3515.76 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715,27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.81W 371714.45 5974463.08 n70 20 18.47 w151 2 27.46 3.24W 371712.01 5974462.15 n70 20 18.46 w151 2 27.53 7.30W 371707.93 5974460.61 n70 20 18.45 w151 2 27.65 12.97W 371702.22 5974458.45 n70 20 18.42 w151 2 27.82 21.07W 371694.06 5974455.37 n70 20 18.39 w151 2 28.05 32.40W 371682.67 5974451.07 n70 20 18.35 w151 2 28.38 46.93W 371668.03 5974445.54 n70 20 18.29 w151 2 28.81 64.66W 371650.19 5974438.79 n70 20 18.22 w151 2 29.33 85.57W 371629.15 5974430.84 n70 20 18.14 w151 2 29.94 109.62W 371604.94 5974421.70 n70 20 18.05 w151 2 30.64 136.79W 371577.59 5974411.37 n70 20 17.94 w151 2 31.43 167.05W 371547.14 5974399.86 n70 20 17.82 w151 2 32.32 200.35W 371513,62 5974387.19 n70 20 17.69 w151 2 33.29 236.66W 371477.07 5974373.39 n70 20 17.55 w151 2 34,35 109.62S 126.38S 144.28S 163.57S 184.48S 275.93W 371437.55 5974358.45 n70 20 17.40 w151 2 35.50 318.12W 371395.08 5974342,41 n70 20 17.23 w151 2 36.73 363.18W 371349.74 5974325,27 n70 20 17.06 w151 2 38.04 411.73W 371300.87 5974306.81 n70 20 16.87 w151 2 39.46 464.36W 371247.90 5974286,80 n70 20 16.66 w151 2 41.00 206.95S 230.93S 256.34S 283.12S 311.19S 520.93W 371190.96 5974265.28 n70 20 16.44 w151 2 42.65 581.27W 371130.22 5974242.33 n70 20 16,20 w151 2 44.41 645.24W 371065.84 5974218.01 n70 20 15.95 w151 2 46.28 712.64W 370998.00 5974192,38 n70 20 15.69 w151 2 48.25 783.30W 370926.88 5974165.51 n70 20 15.41 w151 2 50.31 340.48S 370.90S 402.38S 434.82S 468.14S 857.02W 370852.68 5974137.47 n70 20 15.12 w151 2 52.47 933.60W 370775.61 5974108.35 n70 20 14.82 w151 2 54.70 1012.83W 370695.86 5974078.22 n70 20 14.51 w151 2 57.02 1094.50W 370613.67 5974047.16 n70 20 14.20 w151 2 59.40 1178.37W 370529.25 5974015.27 n70 20 13.87 w151 3 01.85 502.25S 537.05S 572.45S 576.65S 619.52S 1264.22W 370442.85 5973982.62 n70 20 13.53 w151 3 04.36 1351.81W 370354.68 5973949.31 n70 20 13.19 w151 3 06.92 1440.91W 370265.01 5973915.43 n70 20 12.84 w151 3 09.52 1451.49W 370254.36 5973911.40 n70 20 12.80 w151 3 09.83 1559.39W 370145.76 5973870.37 n70 20 12.38 w151 3 12.98 644.04S 680.49S 717.44S 754.79S 792.45S 1620.34W 370084.41 5973846.88 n70 20 12.14 w151 3 14.76 1708.12W 369996.03 5973811,93 n70 20 11.78 w151 3 17.32 1793.84W 369909.71 5973776.43 n70 20 11.41 w151 3 19.82 1877.26W 369825.67 5973740.49 n70 20 11,05 wl51 3 22.26 1958.17W 369744.15 5973704.21 n70 20 10.67 w151 3 24.62 830.32S 868.27S 906.22S 944.06S 981.68S 2036.33W 369665.37 5973667.68 n70 20 10.30 w151 3 26.90 2111.53W 369589.54 5973631,00 n70 20 09.93 w151 3 29.10 2183.56W 369516.88 5973594.28 n70 20 09.55 wlS1 3 31.20 2252.23W 369447,59 5973557.61 n70 20 09.18 w151 3 33.21 2317.35W 369381,85 5973521.10 n70 20 08.81 w151 3 35.11 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 6536,41 on azimuth 278.10 degrees from wellhead. Total Dogleg for wellpath is 211.78 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.86 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33 Alpine Field,North Slope. Alaska Measured Inclin Azimuth True Vert Depth Degrees Degrees Depth 4900.00 44.51 238.04 3585.31 5000.00 41.68 236.57 3658.33 5100.00 38.87 234.92 3734.62 5200.00 36.09 233.07 3813.97 5201.27 36.06 233.05 3815.00 5247.04 36.06 233.05 3852.00 5500.00 36.06 233.05 4056.50 5519.17 36.06 233.05 4072.00 6000.00 36.06 233.05 4460.72 6500.00 36.06 233.05 4864.94 7000.00 36.06 233.05 5269.15 7117.32 36.06 233.05 5364.00 7500.00 36.06 233.05 5673.37 7939.90 36.06 233.05 6029.00 8000.00 36.06 233.05 6077.59 8452.31 36.06 233.05 6443.25 8500.00 35.80 237.90 6481.87 8600.00 35.92 248.15 6562.99 8700.00 36.88 258.14 6643.55 8800.00 38.64 267.52 6722.67 8900.00 41.09 276.07 6799.48 9000.00 44.10 283.75 6873.14 9001.20 44.14 283.83 6874.00 9100.00 47.57 290.57 6942.84 9195.49 51.23 296.39 7005.00 9200.00 51.41 296.65 7007.82 9300.00 55.52 302.09 7067.37 9400.00 59.85 307.00 7120.83 9426.70 61.04 308.24 7134.00 9500.00 64.36 311.49 7167.62 9600.00 68.98 315.65 7207.23 9628.08 70.30 316.77 7217.00 9675.14 72.52 318.61 7232.00 9700.00 73.71 319.56 7239.22 9748.97 76.04 321.40 7252.00 9800.00 78.50 323.29 7263.24 9900.00 83.33 326.88 7279.04 10000.00 88.19 330.41 7286.42 10041.37 90.21 331.86 7287.00 10041.39 90.21 331.86 7287.00 10500.00 90.21 331.86 7285.32 11000.00 90.21 331.86 7283.49 11500.00 90.21 331.86 7281.65 12000.00 90.21 331.86 7279.82 12500.00 90.21 331.86 7277.99 13000.00 90.21 331.86 7276.15 13041.71 90.21 331.86 7276.00 13041.73 90.21 331.86 7276.00 PROPOSAL LISTING Page 2 Your ref : 33 Version#II Last revised : 5-Jun-2001 RECTANGULAR GRID COORDS GEOGRAPHIC COORDINATES Easting Northing COORDINATES 1018.98S 1055.86S 1092.22S 1127.96S 1128.41S 2378.74W 369319.84 5973484.85 n70 20 08.45 w151 3 36.90 2436.24W 369261.73 5973448.95 n70 20 08.08 w151 3 38.58 2489.67W 369207.69 5973413.50 n70 20 07.72 w151 3 40.14 2538.91W 369157.86 5973378.60 n70 20 07.37 w151 3 41.58 2539.51W 369157.26 5973378.16 n70 20 07.37 w151 3 41.59 1144.60S 1234.11S 1240.89S 1411.03S 1587.95S 2561.04W 369135.46 5973362.33 n70 20 07.21 w151 3 42.22 2680.02W 369014.99 5973274.86 n70 20 06.33 w151 3 45.69 2689.03W 369005.87 5973268.23 n70 20 06.26 w151 3 45.96 2915.19W 368776.88 5973101.95 n70 20 04.59 w151 3 52.56 3150.37W 368538.77 5972929.04 n70 20 02.84 w151 3 59.42 1764.88S 1806.39S 1941.80S 2097.45S 2118.72S 3385.54W 368300.66 5972756.14 n70 20 01.10 w151 4 06.29 3440.72W 368244.78 5972715.57 n70 20 00.69 w151 4 07.90 3620.72W 368062.54 5972583.23 n70 19 59.36 w151 4 13.15 3827.62W 367853.05 5972431.11 n70 19 57.83 w151 4 19.19 3855.89W 367824.43 5972410.32 n70 19 57.62 w151 4 20.02 2278.775 2294.62S 2321.10S 2338.20S 2345.72S 4068.64W 367609.03 5972253.91 n70 19 56.04 wl51 4 26.22 4091.67W 367585.73 5972238.45 n70 19 55.89 wl51 4 26.90 4143.73W 367533.24 5972212.85 n70 19 55.63 w151 4 28.42 4200.37W 367476.32 5972196.72 n70 19 55.46 wl51 4 30.07 4260.99W 367415.58 5972190.22 n70 19 55.38 w151 4 31.84 2343.60S 2331.84S 2331.64S 2310.58S 2281.63S 4324.92W 367351.71 5972193.42 n70 19 55.41 w151 4 33.71 4391.45W 367285.38 5972206.30 n70 19 55.52 wl51 4 35.65 4392.27W 367284.58 5972206.52 n70 19 55.52 w151 4 35.67 4459.87W 367217.34 5972228.71 n70 19 55.73 w151 4 37.65 4526.26W 367151.45 5972258.78 n70 19 56.01 w151 4 39.59 2280.06S 2240.60S 2192.64S 2178.46S 2136.705 4529.42W 367148.33 5972260.41 n70 19 56.03 wl51 4 39.68 4599.33W 367079.10 5972301.04 n70 19 56.42 w151 4 41.72 4668.84W 367010.41 5972350.16 n70 19 56.89 w151 4 43.75 4687.24W 366992.26 5972364.65 n70 19 57.03 w151 4 44.29 4737.20W 366943.02 5972407.24 n70 19 57.44 w151 4 45.75 2073.40S 2054.40S 2021.41S 2003.43S 1966.97S 4803.65W 366877.66 5972471.65 n70 19 58.06 wlS1 4 47.69 4821.86W 366859.77 5972490.96 n70 19 58.25 w151 4 48.22 4851.88W 366830.32 5972524.45 n70 19 58.57 wl51 4 49.10 4867.46W 366815.04 5972542.68 n70 19 58.75 wlS1 4 49.56 4897.53W 366785.59 5972579.65 n70 19 59.10 w151 4 50.43 1927.56S 1846.62S 1761.49S 1725.26S 1725.25S 4927.93W 366755.86 5972619.56 n70 19 59.49 w151 4 51.32 4984.41W 366700.77 5972701.44 n70 20 00.29 wl51 4 52.97 5036.26W 366650.36 5972787.43 n70 20 01.12 w151 4 54.49 5056.23W 366631.01 5972823.98 n70 20 01.48 w151 4 55.07 5056.24W 366631.00 5972824.00 n70 20 01.48 wl51 4 55.07 1320.85S 879.95S 439.06S 1.84N 442.73N 5272.54W 366421.59 5973231.96 n70 20 05.46 w151 5 01.40 5508.35W 366193.28 5973676.75 n70 20 09.79 wlS1 5 08.30 5744.16W 365964.98 5974121.53 n70 20 14.12 w151 5 15.20 5979.98W 365736.67 5974566.31 n70 20 18.46 w151 5 22.10 6215.79W 365508.36 5975011.09 n70 20 22.79 wl51 5 29.00 883.63N 920.41N 920.43N 6451.60W 365280.06 5975455.88 n70 20 27.13 wl51 5 35.90 6471.27W 365261.01 5975492.98 n70 20 27.49 wl51 5 36.48 6471.28W 365261.00 5975493.00 n70 20 27.49 w151 5 36.48 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 6536.41 on azimuth 278.10 degrees from wellhead. Total Dogleg for wellpath is 211.78 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 331.86 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33 HOR{Iz~oNTAL PRODUCER COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 Version~ll Last revised : 5-Jun-2001 Comments in wellpath MD TVD Rectangular Coords. Comment 3831.77 3055 44 619.52S 1559.39W KOP - Sidetrack Pt. 5201.27 3815 00 1128.41S 2539.51W EOC 5247.04 3852 5519.17 4072 7117.32 5364 7939.90 6029 8452.31 6443 9001.20 6874 9195.49 7005 9426.70 7134 9628.08 7217 9675.14 7232 9748.97 7252 10041.37 7287 10041.39 7287 13041.71 7276 13041.73 7276 00 1144. 00 1240. 00 1806. 00 2097. 25 2278. 00 2331. 00 2281 00 2178 00 2054 00 2021 00 1966 00 1725 00 1725 00 920 00 920 60S 2561.04W K-3 89S 2689.03W K-2 39S 3440.72W Albian-97 45S 3827.62W Albian-96 77S 4068.64W Begin Final Bld/Trn 64S 4392.27W HRZ 63S 4526.26W K-1 46S 4687.24W LCU 40S 4821.86W Miluveach A 41S 4851.88W Alpine D 97S 4897.53W Alpine 26S 5056.23W Target - EOC - Cst Pt 25S 5056.24W CD2 Tgt52 Heel Rvsd 26-Oct-00 41N 6471.27W TD - Cst Pt. 43N 6471.28W CD2 Tgt52 Toe Rvsd 26-Oct-00 Casing positions in string 'A' Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 4864.94 1587.95S 3150.37W 9 5/8" Casing Targets associated with this wellpath Target nanle Geographic Location T.V.D. Rectangular Coordinates Revised CD2 Tgt52 Heel Rvsd 366631.000,5972824.000,0.0000 7287.00 1725.25S 5056.24W 15-Oct-1997 CD2 Tgt52 Toe Rvsd 2 365261.000,5975493.000,2.0000 7276.00 920.43N 6471.28W 15-Oct-1997 CD2-.,3 Horizontal Producer Ellipse Separation Phillips Alaska, Inc. CD#2 33 slot #33 Alpine Field North Slope, Alaska 3-D MINIMUM DISTANCE CLEARANCE REPORT INCLUDING POSITION UNCERTAINTIES by Baker Hughes INTEQ Your ref : 33 Version#ii Our ref : prop4577 License : Date printed : 6-Jun-2001 Date created : 20-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Report is limited to clearances less than 500 feet Proximities will incorporate ellipses - when survey tools are defined for both wells. Ellipse separation in reverse brackets, e.g. )10.2(, where available. DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4* Object wellpath PMSS <0-11984'>,,35,CD#2 MWD <0-9507'>,,42PH,CD#2 MWD <8480 - 13138'>,,42,CD#2 MWD <0-???'>,,24PH,CD#2 Closest approach with 3-D Minimum Distance method Last revised Distance M.D. Diverging from M.D. 17-May-2001 )20.0( 200.0 10760.0 27-May-2001 )0.1( 9000.0 9034.1 31-May-2001 )13.6( 8800.0 9693.8 4-Jun-2001 )87.0( 400.0 10300.0 Phillips Alaska, Inc. CD#2,33 Alpine Field,North Slope, Alaska CLEARANCE LISTING PaGe 1 Your ref : 33 Version#il Last revised : 5-Jun-2001 Reference wellpath Object wellpath : PMSS <0-11984'>,,35,CD#2 M.D. T.V.D. Rect Coordinates M.D. T.V.D. Horiz Min'm Ellipse Rect Coordinates Bearing Dist Sep'n 0.0 100.0 200.0 300.0 400.0 0.0 100.0 200.0 300.0 400.0 0.0S 0.0S 0.0S 0.0S 0.0S 0.0E 0.0E 0.0E 0.0E 0.0E 0.0 0.0 20.4S 2.6E 172.8 20.6 N/A 100.0 100.0 20.5S 2.6E 172.9 20.7 )20.2( 199.9 199.9 20.9S 2.5E 173.3 21.0 )20.0( 299.9 299.9 21.6S 2.1E 174.3 21.7 )20.1( 399.8 399.8 22.5S 2.1E 174.7 22.5 )20.5( Phillips Alaska, Inc. Sfructure: CDt~2 Field : Alpine Field Well: 53PB1 Location: Norfh Slope, Alaska Point KOP Build 2/100 Base Permafrost Build 5/100 C-40 C-30 C-20 EOC 9 5/8 Casing Pt. K-3 K-2 Albian-97 Albian-96 HRZ K-1 LCU Miluveach A Alpine D Target Alpine Base Alpine TD PROFIL E COMMENT MD Inc Dir TVD 500.00 0.00 0.00 500.00 900.00 4.00 248.33 899.68 1032.91 6.66 248.33 1032.00 2200.00 50.00 248.55 2152.25 2289.90 32.70 248.55 2209.00 2556.05 40.08 248.53 2407.00 3051.29 55.54 248.33 2752.00 3711.77 75.35 248.33 3025.10 6500.00 75.35 248.33 3730.14 6981.93 75.35 248.53 3852.00 7772.87 75.55 248.53 4052.00 14100.41 75.35 248.33 5652.00 15919.58 75.35 248.33 6112.00 19085.55 75.55 248.55 6912.00 20151.12 75.55 248.55 7182.00 20546.59 75.55 248.55 7282.00 20764.10 75.55 248.55 7357.00 20803.65 75.35 248.53 7347.00 20882.72 75.35 248.33 7366.99 20882.74 75.55 248.55 7567.00 21159.80 75.55 248.33 7452.00 21416.65 75.55 248.55 7502.00 DAT A North East V. Sect 0.00 0.00 0.00 -5.15 -12.97 13.96 -9.71 -24.44 26.50 -144.28 -565.18 590.79 -161.55 -406.64 457.55 -215.42 -542.24 585.47 -555.95 -895.96 964.08 -576.65 -1451.49 1561.84 -1572.66 -5958.50 4259.46 - 1744.81 -4591.83 4725.75 -2027.55 -5103.00 5490.97 -4287.65 -10792.55 11612.87 -4957.49 -12428,04 15572.92 -6067.64 -15272.72 16455.88 -6449.07 -16252.80 17466.95 -6590.54 -16588,58 17849.57 -6668,04 -16783.95 18060,01 -6682.16 -16819.51 18098.27 -6710.41 -16890.61 18174.77 -6710.42 -16890.65 18174.79 -6802.24 -17121.76 18423.50 -6901.13 -17370.67 18691.33 Deg/lO0 0.00 1.00 2.00 2.00 3.00 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1900 32O 310 Phillips Alaska, Inc. StrucJure: CD#2 Well: 33PB1 Field: Alpine Reid Location : North Slope, Alaska 340 1700 TRUE NORTH 350 0 210 10 2O 50 40 5O 300 6O 290 7O 280 8O 270 2 0 90 26O 100 250 110 240 120 230 130 220 140 210 150 /. 200 /~3oo 160 lf~O 180 170 Norm(]l Pl(]ne Tr(]velling Cylinder- Feet All depths shown (]re Me(]sured depths on Reference Well tmeC,.a~ ~y ~n~a~ For: S l~eynolcle Date plotted: 5-Jun--2001 Reference I~ 33 13131 Vemfcm~l ~nahw am in feet reference Phillips Alaska, Inc. Structure: CD#2 Well: xSPB1 Field: Alpine Field Location: North Slope, Alaska <- West (feet) 360 340 320 300 280 260 240 220 200 180 160 140 120 100 80 60 40 20 0 20 40 60 80 ~5oo,~to~) ...... ~ -8 5o~ '* '~ t 1600 - '*'- '* '~ . - ' - ' ~ fO00 ~ - - - ~ 6~00 ~ -1 i O0 ~ ~0 "800 - ~ . e~od ...~.~oo ~oo ~o . e~oo ~- ' . ,28~0 ~gO0' -' ' 1200 ~0~e300 20 e 2gO0 - ' ~ . ' .1000 .-1300 ~300 . ' 180~:1200- ' ' ..- _ .... '1100 ..... ,- . ~ . , . ~ - - . - .,..-' ]zuu ~1200 ~600 2000 ...... - ' ' ~50~ --" 1300 ' ~00 ~ ~nn ..... ~ ' ' ~ ~300. * ..e'" . ' [ 1~ ~ - ' - ' .~' ' --~ ~% ~00 800 . ' ' - ' --"' ~eoo - . m6o e ~°~~' ~ ~3oo eo ' ' ' ' ' ' """ ' ' ' ~300' ~00 , ~0~ - ' . -'~2-- ' ' . t fO0 . ~uu '~.700~ 1~0 ~ - ' .-'" 1800 -" ' ' ' ~ 21e ..-'" . t~oo . - _ -~3oo '. ~k ~oo .--"' . -.~:~ . ' ~o~'~; ~oo ~ - - . . soo 1soo ~ - ..--"' .1:~TM ..1boo ~ ~o e 300 ' ' - - . .'~ -12o .--""' 2000 . . '. - ' . - ~3oo "~ : 3~o' · ~oo ~ ~ ....--' . . '.. ' .,~ ~oo .,-~oo , ~oo~ ' -, 700 ~' .-'..' .' ~~~'~ _,:7~~ e~oo ' - ' . ' . ' ~.:__ - · .' ~800 ~ 600 ~ 2200 Phillips Alaska, Inc. Structure: CD#2 Well: 35PB1 Field: Alpine Field Location: North Slope, Alaska <- West (feet) 2400 2300 2200 2100 2000 1go0 1800 1700 1600 1500 1400 1300 1200 1100 1000 go0 800 700 600 500 400 300 200 I I I I I I I I I I I I I I I I I I I . . . . ~o_oq .......... .-.~/o' . - ~%oo 3500 . . 2.7fl0'- '- ..... - '- . ' . ' ...... : ....... 420.0- '." 'o-2~0'0 ,, 2160 'd'~ 200 ,~oo. - ' .--'~_-;~o - ' - ~'~oo . - '~ . .o-" 2100 /,-270(~ . ' .,,,"Z113b"~'. '. '-- I' . ...- '.oo '. ~o - ' -- :- ' .~ooo - - ' - ' .2400 - ' - ~tO0 ....;'..; ' · s7oo . ' -' - ~ ...,,.:. __o .' /~ ~oo '. 7200 - ~: ' ' - ' ' . ' ' . ~ .<_'_'- ~go0 ~' · . .. :' . ' ...~eoo ~ ' ."" ..,~,,',, / / ~ooo ' ' ' ' 2~& ' '.-¢-zo~ .." .-,~2oo ' ' - '- · 6300 . ', ;'~' -' · ~. ~' . . , -~. ~_~ , · ~'~ - seoo, .' .' ~-.~ -..~' ~/'"~'~ ,:.._ ,' ' (~ 700 -,, ' - . ~oo . ;-- . . . . - ..~... ..'"' ..,,~oo --:; ;' . ' . .:: ' ,, ~o6~ ' . .; . ' . ....,~soo . . '...~' ...'- ,-.',, ,,' I . .- .- ~oo . ..-.- . V ~ .-''.-' ..~o~ .' o ' ' · - Phillips Alaska, Inc. Structure: CD#2 Well: ;~SPB1 Field: Alpine Reid Location: North Slope, Alaska <- West (feet) 5900 3800 3700 3600 5500 5400 5500 5200 5100 5000 2900 2800 2700 2600 2500 2400 2500 2200 2100 2000 1900 1800 1700 400 I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 3800 .... ' ' o 7200 'o 7274 · 7200 ~00 ' . 7000 6800 . ' .-'4BC~O 6600~ ~ ~000 6800. ~ - ' =~200 5000 ~o..- ' . · ' s~oo ,.~o' ~6oo - * .' s¢800 52oo...~sb°° ,.-3~00 .,o- . s?~.'-" , ~o?, s~b~ ~oo . . -.. 58/)0 ' . ' eo. og. ,.'4o0.o*~8oo . 6200- ° - . ' '" 649~ . ,. '- 660o. - ,~2oo': ~o ..'4'600 · 4400 ' ~, 48~)0 5O0 6OO 7O0 800 go0 0 ¢- lOOO 11oo ..~ Phillips Alaska, Inc. Structure: CDi~2 Well: 53PB1 Field: Alpine Field Location: North Slope, Alaska <- West (feet) 7400 7200 7000 6800 6600 6400 6200 6000 5800 5600 5400 5200 5000 4.800 4600 4400 4200 4000 3800 3600 3400 5200 3000 5400 ' ~ 5200 ' · - - ' ° , ' 1000 5600 . - - ' ' ' , ' % · ~ 1200 ' ', .7200 ~ "' · ~%o~'-.. fooo · 3800 .-''' . ' b, 7287 .- .- ,., "'~" . . . 4800 .,-5'200 · _ - .5000 ~, .~400 [- ~ 8oo L/) · 4000.. '. ' .5200 ~ 5600 -- , .~-.. ~tO00 .'53,00' ..'5800 ,~ 2000 ' '; . . 4600 ' ' ',.7200 ;~ ~. 6000 . ' · . ,6200 ., 4:8~ -'~'2-oo , ~2oo . ... 5~oo .~4oo ' - · ' - 7000 -~ ~. 5'000.~ .,~,, ,7312 · ..'4400 ' ' . .~7200 .-S~ S',~ .... . ,52'00 [280o -'4~oo . . . 7006 ,' ' ' ~ ' . -..~o~,/7ooo...~'~ F ..o~oo I~ ; 22~°° / .,'moo . s~oo . ~'~oo [ ~2oo · . , 7200 Phillips Alaska, Inc. Structure: CD#2 Well: 35PB1 Reid: Alpine Field Location: North Slope, Alaska <- West (feet) 18000 17400 16800 16200 15600 15000 14400 13800 15200 12600 12000 11400 10800 10200 9600 9000 8400 7800 7200 6600 6000 5400 4800 I I I I I I I I I I I I ! I I I I I I I I I I I I 6 6400 . . 1200 7200 ,6800 . · - , ', .- '. 6800. ..... 'I_ . - '4&o 7203 - '. 4600 -'&o ,.'~o%8 . . 5000 ' 6~i[ ..~- 38OO - . ° ° 5400 ,, 5400 . . '~ O0 I_ 4200 ' ~6oo .,;6oo .?200 -'7~00 5800 ' 6000 - '6~00 t ~BO0 ~ooo ; · . ~200 · ~ ~40o · ,~soo · ,~000 ~ ~2oo · .~400 480O 5400 6OOO 6600 7200 7800 84OO 0 CD2-33PB 1 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB1 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB1 Version#11 Our ref : prop3683 License : Date printed : 5-Jun-2001 Date created : 22-Oct-1999 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33PB 1 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33PB1 Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth 0.00 0.00 0.00 0.00 500.00 0.00 0.00 500.00 600.00 1.00 248.34 599.99 700.00 2.00 248.33 699.96 800.00 3.00 248.33 799.86 900.00 4.00 248.33 899.68 1000.00 6.00 248.33 999.29 1032.91 6.66 248.33 1032.00 1100.00 8.00 248.33 1098.54 1200.00 10.00 248.33 1197.31 1300.00 12.00 248.33 1295.46 1400.00 14.00 248.33 1392.89 1500.00 16.00 248.33 1489.48 1600.00 18.00 248.33 1585.11 1700.00 20.00 248.33 1679.66 1800.00 22.00 248.33 1773.01 1900.00 24.00 248.33 1865.05 2000.00 26.00 248.33 1955.68 2100.00 28.00 248.33 2044.78 2200.00 30.00 248.33 2132.23 2289.90 32.70 248.33 2209.00 2300.00 33.00 248.33 2217.49 2400.00 36.00 248.33 2299.89 2500.00 39.00 248.33 2379.22 2536.03 40.08 248.33 2407.00 2600.00 42.00 248.33 2455.25 2700.00 45.00 248.33 2527.78 2800.00 48.00 248.33 2596.61 2900.00 51.00 248.33 2661.54 3000.00 54.00 248.33 2722.41 3051.29 55.54 248.33 2752.00 '3100.00 57.00 248.33 2779.05 3200.00 60.00 248.33 2831.29 3300.00 63.00 248.33 2879.00 3400.00 66.00 248.33 2922.05 3500.00 69.00 248.33 2960.31 3600.00 72.00 248.33 2993.69 3700.00 75.00 248.33 3022.09 3711.77 75.35 248.33 3025.10 4000.00 75.35 248.33 3097.98 4500.00 75.35 248.33 3224.41 5000.00 75.35 248.33 3350.84 5500.00 75.35 248.33 3477.27 6000.00 75.35 248.33 3603.71 6500.00 75.35 248.33 3730.14 6981.93 75.35 248.33 3852.00 7000.00 75.35 248.33 3856.57 7500.00 75.35 248.33 3983.00 7772.87 75.35 248.33 4052.00 8000.00 75.35 248.33 4109.43 PROPOSAL LISTING Page 1 Your ref : 33 PB1 Version#il Last revised : 5-Jun-2001 R E C T A N G U L A R Dogleg Vert C 00 R D I N A T E $ Deg/100ft Sect 0.00 S 0.00 E 0.00 0.00 0.00 N 0.00 E 0.00 0.00 KOP 0.32 S 0.81 W 1.00 0.87 1.29 S 3.24 W 1.00 3.49 2.90 S 7.30 W 1.00 7.85 5.15 S 12.97 W 1.00 13.96 Build 2/100 8.37 S 21.07 W 2.00 22.67 9.71 S 24.44 W 2.00 26.30 Base Permafrost 12.87 S 32.40 W 2.00 34.86 18.64 S 46.93 W 2.00 50.50 25.69 S 64.66 W 2.00 69.58 33.99 S 85.57 W 2.00 92.07 43.55 S 109.62 W 2.00 117.96 54.34 S 136.79 W 2.00 147.19 66.36 S 167.05 W 2.00 179.75 79.59 S 200.35 W 2.00 215.58 94.02 S 236.66 W 2.00 254.65 109.62 S 275.93 W 2.00 296.91 126.38 S 318.12 W 2.00 342.31 144.28 S 363.18 W 2.00 390.79 Build 3/100 161.55 $ 406.64 W 3.00 437.55 C-40 163.57 S 411.73 W 3.00 443.03 184.48 S 464.36 W 3.00 499.67 206.96 S 520.93 W 3.00 560.53 215.42 S 542.24 W 3.00 583.47 C-30 230.93 S 581.28 W 3.00 625.47 256.34 S 645.24 W 3.00 694.30 283.12 S 712.65 W 3.00 766.83 311.19 S 783.31 W 3.00 842.86 340.48 S 857.03 W 3.00 922.19 355.95 S 895.96 W 3.00 964.08 C-20 370.91 S 933.61 W 3.00 1004.59 402.38 S 1012.84 W 3.00 1089.84 434.83 S 1094.50 W 3.00 1177.72 468.15 S 1178.38 W 3.00 1267.96 502.26 S 1264.23 W 3,00 1360.34 537.06 S 1351.82 W 3.00 1454.59 572.45 S 1440.92 W 3.00 1550.47 576.65 S 1451.49 W 3.00 1561.84 EOC 679.62 S 1710.65 W 0.00 1840.71 858.22 S 2160.22 W 0.00 2324.46 1036.83 S 2609.79 W 0.00 2808.21 1215.44 S 3059.36 W 0.00 3291.96 1394.05 S 3508.93 W 0.00 3775.71 1572.66 S 3958.50 W 0.00 4259.46 9 5/8" Casing Pt. 1744.81 S 4391.83 W 0.00 4725.73 K-3 1751.27 S 4408.07 W 0.00 4743.21 1929.88 S 4857.65 W 0.00 5226.96 2027.35 S 5103.00 W 0.00 5490.97 K-2 2108.48 S 5307.22 W 0.00 5710.71 All data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33PB 1 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB1 Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert PROPOSAL LISTING Page 2 Your ref : 33 PB1 Version~ll Last revised : 5-Jun-2001 R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100ft Sect 8500.00 75.35 248.33 4235.86 2287.09 S 5756.79 W 0.00 6194.46 9000.00 75.35 248.33 4362.30 2465.70 S 6206.36 W 0.00 6678.22 9500.00 75.35 248.33 4488.73 2644.31 S 6655.93 W 0.00 7161.97 10000.00 75.35 248.33 4615.16 2822.92 S 7105.50 W 0.00 7645.72 10500.00 75.35 248.33 4741.59 3001.53 S 7555.07 W 0.00 8129.47 11000.00 75.35 248.33 4868.02 3180.13 S 8004.64 W 0.00 8613.22 11500.00 75.35 248.33 4994.45 3358.74 S 8454.21 W 0.00 9096.97 12000.00 75.35 248.33 5120.88 3537.35 S 8903.78 W 0.00 9580.72 12500.00 75.35 248.33 5247.32 3715.96 S 9353.36 W 0.00 10064.47 13000.00 75.35 248.33 5373.75 3894.57 S 9802.93 W 0.00 10548.22 13500.00 75.35 248.33 5500.18 4073.18 S 10252.50 W 0.00 11031.98 14000.00 75.35 248.33 5626.61 4251.79 S 10702.07 W 0.00 11515.73 14100.41 75.35 248.33 5652.00 4287.65 S 10792.35 W 0.00 11612.87 Albian-97 14500.00 75.35 248.33 5753.04 4430.39 S 11151.64 W 0.00 11999.48 15000.00 75.35 248.33 5879.47 4609.00 S 11601.21 W 0.00 12483.23 15500.00 75.35 248.33 6005.90 4787.61 S 12050.78 W 0.00 12966.98 15919.58 75.35 248.33 6112.00 4937.49 S 12428.04 W 0.00 13372.92 Albian-96 16000.00 75.35 248.33 6132.34 4966.22 S 12500.35 W 0.00 13450.73 16500.00 75.35 248.33 6258.77 5144.83 S 12949.92 W 0.00 13934.48 17000.00 75.35 248.33 6385.20 5323.44 S 13399.49 W 0.00 14418.23 17500.00 75.35 248.33 6511.63 5502.05 S 13849.07 W 0.00 14901.98 18000.00 75.35 248.33 6638.06 5680.65 S 14298.64 W 0.00 15385.73 18500.00 75.35 248.33 6764.49 5859.26 $ 14748.21 W 0.00 15869.49 19000.00 75.35 248.33 6890.92 6037.87 S 15197.78 W 0.00 16353.24 19083.35 75.35 248.33 6912.00 6067.64 S 15272.72 W 0.00 16433.88 HRZ 19500.00 75.35 248.33 7017.36 6216.48 S 15647.35 W 0.00 16836.99 20000.00 75.35 248.33 7143.79 6395.09 S 16096.92 W 0.00 17320.74 20151.12 75.35 248.33 7182.00 6449.07 S 16232.80 W 0.00 17466.95 K-1 20500.00 75.35 248.33 7270.22 6573.70 S 16546.49 W 0.00 17804.49 20546.59 75.35 248.33 7282.00 6590.34 S 16588.38 W 0.00 17849.57 LCU 20764.10 75.35 248.33 7337.00 6668.04 S 16783.95 W 0.00 18060.01 Miluveach A 20803.65 75.35 248.33 7347.00 6682.16 S 16819.51 W 0.00 18098.27 Alpine D 20882.72 75.35 248.33 7366.99 6710.41 S 16890.61 W 0.00 18174.77 Target 20882.74 75.35 248.33 7367.00 6710.42 S 16890.63 W 0.00 18174.79 AlpWst 2ndryTgt Rvsd 15-Mar-01 21000.00 75.35 248.33 7396.65 6752.31 S 16996.06 W 0.00 18288.24 21139.80 75.35 248.33 7432.00 6802.24 S 17121.76 W 0.00 18423.50 Base Alpine 21416.63 75.35 248.33 7502.00 6901.13 S 17370.67 W 0.00 18691.33 TD Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ i CD2-33PB 1 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33PB1 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB1 Version~ll Last revised : 5-Jun-2001 Comments in wellpath MD TVD Rectangular Coords. Cogent 500 00 900 00 1032 91 2200 00 2289 90 2536 03 3051.29 3711.77 6500 00 6981 93 7772 87 14100 41 15919 58 19083 35 20151 t2 20546 59 20764 10 20803 65 20882.72 20882.74 21139.80 21416.63 500 899 1032 2132 2209 2407 2752 3025 3730 3852 4052 00 5652 00 6112 00 6912 00 7182 00 7282 00 7337 00 7347 00 7366 99 7367 00 7432.00 7502.00 0.00 N 0 5.15 S 12 9.71 S 24 144.28 S 363 161.55 S 406 215.42 S 542 355.95 S 895 576.65 S 1451 1572.66S 3958 1744.81S 4391 2027.35$ 5103 4287.65S 10792 4937.49S 12428 6067.64S 15272 6449.07S 16232 6590.34S 16588 6668.04S 16783 6682.16S 16819 6710.41S 16890 6710.42S 16890 6802.24S 17121 6901.13S 17370 00 E KOP 97 W Build 2/100 44 W Base Permafrost 18 W Build 3/100 64 W C-40 24 W C-30 96 W C-20 49 W EOC 50 W 9 5/8" Casing Pt. 83 W K-3 00 W K-2 35 W Albian-97 04 W Albian-96 72 W MRZ 80 W K-1 38 W 5CU 95 W Miluveach A 51 W Alpine D 61 W Target 63 W AlpWst 2ndryTgt Rvsd 15-Mar-01 76 W Base Alpine 67 W TD Casing positions in string 'A' ============================== TOp MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.14 1572.66S 3958.50W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised AlpWst 2ndryTgt Rvsd 354715.000,5968040.000,0.0000 7367.00 6710.42S 16890.63W 15-Mar-2001 CD2-33PB 1 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB1 slot ~33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB1 Version#11 Our ref : prop3683 License : Date printed : 5-Jun-2001 Date created : 22-Oct-1999 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Phillips Alaska. Inc. CD#2,33PB1 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 1 Your ref : 33 PB1 Version#il Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C O O R D S G E 0 G R A P H I C Depth Degrees Degrees Depth 0.00 0.00 0.00 0.00 500.00 0.00 0.00 500.00 600.00 1.00 248.34 599.99 700.00 2.00 248.33 699.96 800.00 3.00 248.33 799.86 900.00 4.00 248.33 899.68 1000.00 6.00 248.33 999.29 1032.91 6.66 248.33 1032.00 1100.00 8.00 248.33 1098.54 1200.00 10.00 248.33 1197.31 1300.00 12.00 248.33 1295.46 1400.00 14.00 248.33 1392.89 1500.00 16.00 248.33 1489.48 1600.00 18.00 248.33 1585.11 1700.00 20.00 248.33 1679.66 1800.00 22.00 248.33 1773.01 1900.00 24.00 248.33 1865.05 2000.00 26.00 248.33 1955.68 2100.00 28.00 248.33 2044.78 2200.00 30.00 248.33 2132.23 2289.90 32.70 248.33 2209.00 2300.00 33.00 248.33 2217.49 2400.00 36.00 248.33 2299.89 2500.00 39.00 248.33 2379.22 2536.03 40.08 248.33 2407.00 2600.00 42.00 248.33 2455.25 2700.00 45.00 248.33 2527.78 2800.00 48.00 248.33 2596.61 2900.00 51.00 248.33 2661.54 3000.00 54.00 248.33 2722.41 3051.29 55.54 248.33 2752.00 3100.00 57.00 248.33 2779.05 3200.00 60.00 248.33 2831.29 3300.00 63.00 248.33 2879.00 3400.00 66.00 248.33 2922.05 3500.00 69.00 248.33 2960.31 3600.00 72.00 248.33 2993.69 3700.00 75.00 248.33 3022.09 3711.77 75.35 248.33 3025.10 4000.00 75.35 248.33 3097.98 4500.00 75.35 248.33 3224.41 5000.00 75.35 248.33 3350.84 5500.00 75.35 248.33 3477.27 6000.00 75.35 248.33 3603.71 6500.00 75.35 248.33 3730.14 6981.93 75.35 248.33 3852.00 7000.00 75.35 248.33 3856.57 7500.00 75.35 248.33 3983.00 7772.87 75.35 248.33 4052.00 8000.00 75.35 248.33 4109.43 C O 0 R D I N A T E S Easting Northing C O O R D I N A T E S 0.00S 0.00N 0.32S 1.29S 2.90S 0.00E 371715.27 5974463.39 n70 20 18.47 w151 2 27.44 0.00E 371715.27 5974463.39 n70 20 18.48 w151 2 27.44 0.81W 371714.45 5974463.08 n70 20 18.47 w151 2 27.46 3.2~W 371712.01 5974462.15 n70 20 18.46 w151 2 27.53 7.30W 371707.93 5974460.61 n70 20 18.45 w151 2 27.65 5.15S 8.37S 9.71S 12.87S 18.64S 12.97W 371702.22 5974458.45 n70 20 18.42 w151 2 27.82 21.07W 371694.06 5974455.37 n70 20 18.39 w151 2 28.05 24.44W 371690.67 5974454.09 n70 20 18.38 w151 2 28.15 32.40W 371682.67 5974451.07 n70 20 18.35 w151 2 28.38 46.93W 371668.03 5974445.54 n70 20 18.29 wl51 2 28.81 25.69S 33.99S 43.55S 54.34S 66.36S 64.66W 371650.19 5974438.79 n70 20 18.22 w151 2 29.33 85.57W 371629.15 5974430.84 n70 20 18.14 w151 2 29.94 109.62W 371604.94 5974421.70 n70 20 18.05 w151 2 30.64 136.79W 371577.59 5974411.37 n70 20 17.94 w151 2 31.43 167.05W 371547.14 5974399.86 n70 20 17.82 w151 2 32.32 79.59S 94.02S 109.62S 126.38S 144.28S 200.35W 371513.62 5974387.20 nT0 20 17.69 w151 2 33.29 236.66W 371477.07 5974373.39 n70 20 17.55 w151 2 34.35 275.93W 371437.55 5974358.45 n70 20 17.40 w151 2 35.50 318.12W 371395.08 5974342.41 n70 20 17.23 w151 2 36.73 363.18W 371349.74 5974325.27 n70 20 17.06 w151 2 38.04 161.55S 163.57S 184.48S 206.96S 215.42S 406.64W 371306.00 5974308.75 n70 20 16.89 w151 2 39.31 411.73W 371300.87 5974306.81 n70 20 16.87 w151 2 39.46 464.36W 371247.90 5974286.79 n70 20 16.66 w151 2 41.00 520.93W 371190.96 5974265.28 n70 20 16.44 w151 2 42.65 542.24W 371169.51 5974257.18 n70 20 16.36 w151 2 43.27 230.93S 256.34S 283.12S 311.19S 340.48S 581.28W 371130.22 5974242.33 n70 20 16.20 w151 2 44.41 645.24W 371065.84 5974218.01 n70 20 15.95 w151 2 46.28 712.65W 370998.00 5974192.37 n70 20 15.69 w151 2 48.25 783.31W 370926.88 5974165.50 n70 20 15.41 w151 2 50.31 857.03W 370852.68 5974137.47 n70 20 15.12 w151 2 52.47 355.95S 370.91S 402.38S 434.83S 468.15S 895.96W 370813.49 5974122.66 n70 20 14.97 w151 2 53.60 933.61W 370775.60 5974108.34 n70 20 14.82 w151 2 54.70 1012.84W 370695.86 5974078.21 n70 20 14.51 w151 2 57.02 1094.50W 370613.66 5974047.16 n70 20 14.20 w151 2 59.40 1178.38W 370529.25 5974015.26 n70 20 13.87 w151 3 01.85 502.26S 537.06S 572.45S 576.65S 679.62S 1264.23W 370442.84 5973982.61 n70 20 13.53 w151 3 04.36 1351.82W 370354.68 5973949.30 n70 20 13.19 w151 3 06.92 1440.92W 370265.00 5973915.42 n70 20 12.84 w151 3 09.52 1451.49W 370254.36 5973911.40 n70 20 12.80 w151 3 09.83 1710.65W 369993.52 5973812.84 n70 20 11.79 w151 3 17.39 858.22S 1036.83S 1215.44S 1394.05S 1572.66S 2160.22W 369541.03 5973641.87 n70 20 10.03 w151 3 30.52 2609.79W 369088.54 5973470.90 n70 20 08.27 w151 3 43.65 3059.36W 368636.05 5973299.93 n70 20 06.51 w151 3 56.77 3508.93W 368183.56 5973128.97 n70 20 04.75 w151 4 09.90 3958.50W 367731.07 5972958.00 n70 20 02.99 wl51 4 23.02 1744.81S 1751.27S 1929.88S 2027.35S 2108.48S 4391.83W 367294.94 5972793.21 n70 20 01.29 w151 4 35.67 4408.07W 367278.58 5972787.03 n70 20 01.23 w151 4 36.15 4857.65W 366826.09 5972616.06 n70 19 59.47 w151 4 49.27 5103.00W 366579.15 5972522.75 n70 19 58.51 w151 4 56.43 5307.22W 366373.60 5972445.09 n70 19 57.71 w151 5 02.39 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot ~33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33PB 1 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33PB1 Alpine Field,North Slope, Alaska Measured Inclin Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C O 0 R D I N A T E S 8500.00 75.35 248.33 4235.86 2287.09S 5756.79W 9000.00 75.35 248.33 4362.30 2465.70S 6206.36W 9500.00 75.35 248.33 4488.73 2644.31S 6655.93W 10000.00 75.35 248.33 4615.16 2822.92S 7105.50W 10500.00 75.35 248.33 4741.59 3001.53S 7555.07W 11000.00 75.35 248.33 4868.02 3180.13S 8004.64W 11500.00 75.35 248.33 4994.45 3358.74S 8454.21W 12000.00 75.35 248.33 5120.88 3537.35S 8903.78W 12500.00 75.35 248.33 5247.32 3715.96S 9353.36W 13000.00 75.35 248.33 5373.75 3894.57S 9802.93W 13500.00 75.35 248.33 5500.18 4073.18S 10252.50W 14000.00 75.35 248.33 5626.61 4251.79S 10702.07W 14100.41 75.35 248.33 5652.00 4287.65S 10792.35W 14500.00 75.35 248.33 5753.04 4430.39S 11151.64W 15000.00 75.35 248.33 5879.47 4609.00S 11601.21W 15500.00 75.35 248.33 6005.90 4787.61S 12050.78W 15919.58 75.35 248.33 6112.00 4937.49S 12428.04W 16000.00 75.35 248.33 6132.34 4966.22S 12500.35W 16500.00 75.35 248.33 6258.77 5144.83S 12949.92W 17000.00 75.35 248.33 6385.20 5323.44S 13399.49W 17500.00 75.35 248.33 6511.63 5502.05S 13849.07W 18000.00 75.35 248.33 6638.06 5680.65S 14298.64W 18500.00 75.35 248.33 6764.49 5859.26S 14748.21W 19000.00 75.35 248.33 6890.92 6037.87S 15197.78W 19083.35 75.35 248.33 6912.00 6067.64S 15272.72W 19500.00 75.35 248.33 7017.36 6216.48S 15647.35W 20000.00 75.35 248.33 7143.79 6395.09S 16096.92W 20151.12 75.35 248.33 7182.00 6449.07S 16232.80W 20500.00 75.35 248.33 7270.22 6573.70S 16546.49W 20546.59 75.35 248.33 7282.00 6590.34S 16588.38W 20764.10 75.35 248.33 7337.00 6668.04S 16783.95W 20803.65 75.35 248.33 7347.00 6682.16S 16819.51W 20882.72 75.35 248.33 7366.99 6710.41S 16890.61W 20882.74 75.35 248.33 7367.00 6710.42S 16890.63W 21000.00 75.35 248.33 7396.65 6752.31S 16996.06W 21139.80 75.35 248.33 7432.00 6802.24S 17121.76W 21416.63 75.35 248.33 7502.00 6901.13S 17370.67W PROPOSAL LISTING Page 2 Your ref : 33 PB1 Version~ll Last revised : 5-Jun-2001 GRID C O O R D S GEOGRAPHIC Easting Northing C O 0 R D I N A T E S 365921.11 5972274.12 n70 19 55.95 w151 5 15.52 365468.63 5972103.15 n70 19 54.19 w151 5 28.64 365016.14 5971932.18 n70 19 52.43 w151 5 41.76 364563.65 5971761.22 n70 19 50.66 w151 5 54.88 364111.16 5971590.25 n70 19 48.90 w151 6 08.00 363658.67 5971419.28 n70 19 47.14 w151 6 21.12 363206.18 5971248.31 n70 19 45.38 w151 6 34.24 362753.69 5971077.34 n70 19 43.62 w151 6 47.35 362301.20 5970906.37 n70 19 41.85 wl51 7 00.47 361848.71 5970735.40 n70 19 40.09 w151 7 13.59 361396.22 5970564.44 n70 19 38.33 w151 7 26.70 360943.73 5970393.47 n70 19 36.56 w151 7 39.82 360852.86 5970359.13 n70 19 36.21 w151 7 42.45 360491.24 5970222.50 n70 19 34.80 w151 7 52.93 360038.75 5970051.53 n70 19 33.03 w151 8 06.05 359586.27 5969880.56 n70 19 31.27 w151 8 19.16 359206.56 5969737.09 n70 19 29.79 w151 8 30.16 359133.78 5969709.59 n70 19 29.51 wlS1 8 32.27 358681.29 5969538.62 n70 19 27.74 w151 8 45.38 358228.80 5969367.65 n70 19 25.98 w151 8 58.50 357776.31 5969196.69 n70 19 24.21 wlS1 9 11.61 357323.82 5969025.72 n70 19 22.44 wl51 9 24.72 356871.33 5968854.75 n70 19 20.68 w151 9 37.83 356418.84 5968683.78 n70 19 18.91 w151 9 50.94 356343.41 5968655.28 n70 19 18.62 w151 9 53.12 355966.35 5968512.81 n70 19 17.15 w151 10 04.04 355513.86 5968341.84 n70 19 15.38 wl51 10 17.15 355377.10 5968290.17 n70 19 14.84 w151 10 21.11 355061.37 5968170.87 n70 19 13.61 w151 10 30.26 355019.21 5968154.94 n70 19 13.45 wlS1 10 31.48 354822.37 5968080.57 n70 19 12.68 wlS1 10 37.18 354786.58 5968067.05 n70 19 12.54 w151 10 38.22 354715.02 5968040.01 n70 19 12.26 w151 10 40.29 354715.00 5968040.00 n70 19 12.26 w151 10 40.29 354608.88 5967999.90 n70 19 11.84 w151 l0 43.37 354482.37 5967952.10 n70 19 11.35 w151 10 47.03 354231.84 5967857.44 n70 19 10.37 w151 10 54.29 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 18691.33 on azimuth 248.33 degrees from wellhead. Total Dogleg for wellpath is 75.35 degrees. Vertical section is from wellhead on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33PB 1 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33PB1 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB1 Version~ll Last revised : 5-Jun-2001 Comments in wellpath MD TVD Rectangular Coords. Coherent 500 00 500 00 0.00N 0.00E KOP 900 00 1032 91 2200 00 2289 90 2536 03 3051 29 3711 77 6500 00 6981 93 7772 87 14100 41 15919 58 19083 35 20151 12 20546 59 20764 10 20803 65 20882.72 20882.74 21139.80 21416.63 899 68 1032 00 2132 23 2209 00 2407 00 2752 00 3025 10 3730 14 3852 00 4052 00 5652.00 6112.00 6912.00 7182.00 7282.00 7337.00 7347.00 7366.99 7367.00 7432.00 7502.00 5.15S 12.97W Build 2/100 9.71S 24.44W Base Permafrost 144.28S 363.18W Build 3/100 161.55S 406.64W C-40 215.42S 542.24W C-30 355.95S 895.96W C-20 576.65S 1451.49W EOC 1572.66S 3958.50W 9 5/8" Casing Pt. 1744.81S 4391.83W K-3 2027.35S 5103.00W K-2 4287.65S 10792.35W Albian-97 4937.49S 12428.04W Albian-96 6067.64S 15272.72W HRZ 6449.07S 16232.80W K-1 6590.34S 16588.38W LCU 6668.04S 16783.95W Miluveach A 6682.16S 16819.51W Alpine D 6710.41S 16890.61W Target 6710.42S 16890.63W AlpWst 2ndryTgt Rvsd 15-Mar-01 6802.24S 17121.76W Base Alpine 6901.13S 17370.67W TD Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.14 1572.66S 3958.50W 9 5/8" Casing Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised AlpWst 2ndryTgt Rvsd 354715.000,5968040.000,0.0000 7367.00 6710.42S 16890.63W 15-Mar-2001 Phillips Alaska, Inc. Sfrucfure: CD#2 Well : ~;~PB2 Field: Alpine Field Location : Norlh Slope, Alnsk= 3600 1 5200 560O 72OO 9 5/8 Casing Pt. K0P -Sldetmck Pt. K--5 K-2 DLS: ,.3.00 deg per 248.33 AZIMUTH 11095' (TO TARGET) ***Plane of Proposal*** 76O0 TANGENT ANGLE 63.40 DEG Albian--97 Albian-96 HRZ K-1 A D - Alpine Alpine ~C~ I I I I I t I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 4000 44013 4800 5200 5600 6000 6400 6800 7200 761313 8000 8400 8800 92013 96011 100013 10400 10800 11200 11600 120130 12400 12800 13200 Vertical Section (feet) -> Azimuth 248.55 with reference 0.00 S, 0.00 E from slot #55 ba~o~ For: S Reynolds F~fm-e~ i~ 3.3 PB2 Ve~eicm~l 1. are in fe=t refe~efl,- ~lot ~.~. Phillips Alaska, Inc. Sfru¢lure: CD#2 Field : Alpine Field Well : 53PB2 Location: North Slope, Alaska Point KOP - Sidetrack Pt. K-2 EOC Albion-97 Albian-96 HRZ K-1 LCU Miluveach A Alpine D Target - Alpine Base Alpine PROFILE MD Inc 7000.00 75.55 7659.09 66.78 7985.59 65.40 10565.61 65.40 12049.00 65.40 15994.55 65.40 1 4289.58 65.40 14631.15 63.40 1 4874.60 63.40 14899.17 63.40 1 4975.12 63.40 15129.24 65.40 COMMENT DATA Dir TVD North East 248.33 3856.59 -1751.25 -4408.08 229.46 4072.00 -2068.95 -4939.84 219.59 4208.94 -2278.49 -5145.72 219.59 5364.00 -4061.45 -6609.78 219.59 6029.00 -5087.92 -7452.68 219.59 6900.00 -6452.40 -8556.69 219.59 7052.00 -6656.15 -8724.00 219.59 7185.00 -6872.52 -8917.9.3 219.59 7294.00 -7040.57 -9056.09 219.59 7505.00 -7057.55 -9070.05 219.59 7559.00 -7110.05 -9115.15 219.39 7408.00 -721 6.54 -9200.59 V. Sect Deg/1 O0 4745.21 0.00 5554.70 3.00 562,5.41 5.00 7642.56 0.00 8804.74 0.00 10527.18 0.00 10557.91 0.00 10825.54 0.00 11015.86 0.00 11055.09 0.00 11094.52 0.00 11215.13 0.00 TD 15339.20 63.40 219.39 7502.00 -7361.64 -9319.73 11579.45 0.00 Phillips Alaska, Inc. Structure: CD#2 Field: Alpine Fleld Well: 5:5PB2 Location: Nodh Slope, Alaska 310 1800 TRUE NORTH 350 0 10 340 20 210 30 320 40 50 3OO 60 29O 70 280 80 270 2 0 9O 260 lO0 250 110 240 120 230 220 140 210 150 2OO 16O 1 180 170 130 Normel Plone Trovelling Cylinder- Feet All depths shown ore Meosured depths on Reference Well CD2-33PB2 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB2 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB2 Version#il Our ref : prop4551 License : Date printed : 5-Jun-2001 Date created : 15-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North {" CD2-33PB2 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field,North Slope, Alaska Measured Inclin. Azimuth True Vert R E C T A N G U L A R Depth Degrees Degrees Depth C O O R D I N A T E S 0.00 0.00 0.00 0.00 0.00 S 0.00 100.00 0.00 248.33 100.00 0.00 S 0.00 200.00 0.00 248.33 200.00 0.00S 0.00 300.00 0.00 248.33 300.00 0.00$ 0.00 400.00 0.00 248.33 400.00 0.00S 0.00 500.00 0.00 248.33 500.00 0.00S 0.00 600.00 1.00 248.33 599.99 0.32S 0.81 700.00 2.00 248.33 699.96 1.29S 3.24 800.00 3.00 248.33 799.86 2.90S 7.30 900.00 4.00 248.33 899.68 5.15S 12.97 1000.00 6.00 248.33 999.29 8.37 S 21.07 1100.00 8.00 248.33 1098.54 12.87S 32.40 1200.00 10.00 248.33 1197.30 18.65S 46.93 1300.00 12.00 248.33 1295.46 25.69S 64.66 1400.00 14.00 248.33 1392.89 34.00S 85.57 1500.00 16.00 248.33 1489.48 43.55S 109.62 1600.00 18.00 248.33 1585.11 54.34S 136.79 1700.00 20.00 248.33 1679.65 66.36S 167.05 1800.00 22.00 248.33 1773.01 79.60S 200.35 1900.00 24.00 248.33 1865.05 94.02S 236.66 2000.00 26.00 248.33 1955.68 109.62S 275.93 2100.00 28.00 248.33 2044.77 126.38S 318.12 2200.00 30.00 248.33 2132.23 144.28S 363.18 2299.99 33.00 248.33 2217.48 163.57S 411.73 2399.99 36.00 248.33 2299.88 184.48S 464.36 2499.99 39.00 248.33 2379.21 206,95S 520.93 2599.99 42.00 248.33 2455.24 230.93S 581.27 2699.99 45.00 248.33 2527.77 256.34S 645.24 2799.99 48.00 248.33 2596.60 283.12S 712.64 2899.99 51.00 248.33 2661.54 311.19S 783.30 2999.99 54.00 248.33 2722.41 340.48S 857.02 3099.99 57.00 248.33 2779.04 370.90S 933.60 3199.99 60.00 248.33 2831.29 402.38S 1012.83 3299.99 63.00 248.33 2879.00 434.82S 1094.50 3399.99 66.00 248.33 2922,04 468.14S 1178.37 3499.99 69.00 248.33 2960.31 502.25S 1264.22 3599.99 72.00 248.33 2993.69 537.05S 1351.81 3699.99 75.00 248.33 3022.09 572.45S 1440.91 3711.77 75.35 248.33 3025.10 576.65S 1451.49 4000.00 75.35 248.33 3097.98 679,61S 1710.65 4500,00 75,35 248,33 3224,42 858.22 S 2160.22 5000.00 75.35 248.33 3350.85 1036,82S 2609.79 5500.00 75.35 248.33 3477.29 1215.43S 3059.36 6000.00 75.35 248.33 3603.72 1394.03S 3508.94 6500.00 75.35 248.33 3730.15 1572.64S 3958.51 7000,00 75.35 248.33 3856.59 1751.25S 4408.08 7100,00 73,94 245.59 3883.07 1788.97S 4496.81 7200.00 72.56 242.81 3911.90 1830.64S 4583.01 7300.00 71.21 239.99 3943.00 1876.12S 4666.45 7400.00 69.91 237.12 3976.28 1925.30S 4746.89 PROPOSAL LISTING Page 1 Your ref : 33 PB2 Version#il Last revised : 5-Jun-2001 Dogleg Vert Deg/100ft Sect 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.87 1.00 3.49 1.00 7.85 1.00 13.96 2.00 22.67 2.00 34.86 2.00 50.50 2.00 69.58 2.00 92.07 2.00 117,96 2.00 147.19 2.00 179.75 2.00 215.58 2.00 254.65 2.00 296.91 2.00 342,31 2.00 390.79 3.00 443.03 3.00 499.66 3.00 560.53 3.00 625.47 3.00 694.29 3.00 766.82 3.00 842.85 3.00 922.18 3.00 1004.58 3.00 1089.84 3.00 1177.71 3.00 1267.96 3.00 1360.33 3.00 1454.59 3.00 1550.46 3.00 1561.84 0.00 1840.70 0.00 2324.46 0.00 2808.21 0.00 3291.96 0.00 3775.71 0.00 4259.46 0.00 4743.21 KOP - Sidetrack Pt. 3.00 4839.60 3.00 4935.09 3.00 5029.43 3.00 5122.35 All data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees, Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33PB2 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 2 Your ref : 33 PB2 Version#Il Last revised : 5-Jun-2001 Measured Inclin. Azimuth True Vert R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100ft Sect 7500.00 68.66 234.20 4011.66 1978.05 S 4824.12 W 3.00 5213.59 7600.00 67.46 231.24 4049.02 2034.22 S 4897.92 W 3.00 5302.92 7659.09 66.78 229.46 4072.00 2068.95 S 4939.84 W 3.00 5354.70 K-2 7700.00 66.32 228.22 4088.28 2093.65 S 4968.09 W 3.00 5390.08 7800.00 65.23 225.16 4129.33 2156.18 S 5034.45 W 3.00 5474.84 7900.00 64.21 222.04 4172.04 2221.65 S 5096.80 W 3.00 5556.95 7983.59 63.40 219.39 4208.94 2278.49 S 5145.72 W 3.00 5623.41 EOC 8000.00 63.40 219.39 4216.29 2289.83 S 5155.03 W 0.00 5636.25 8500.00 63.40 219.39 4440.14 2635.36 S 5438.76 W 0.00 6027.52 9000.00 63.40 219.39 4663.98 2980.88 S 5722.49 W 0.00 6418.78 9500.00 63.40 219.39 4887.83 3326.41 S 6006.22 W 0.00 6810.05 10000.00 63.40 219.39 5111.68 3671.94 S 6289.95 W 0.00 7201.32 10500.00 63.40 219.39 5335.52 4017.47 S 6573.68 W 0.00 7592.59 10563.61 63.40 219.39 5364.00 4061.43 S 6609.78 W 0.00 7642.36 Albian-97 11000.00 63.40 219.39 5559.37 4363.00 S 6857.41 W 0.00 7983.85 11500.00 63.40 219.39 5783.22 4708.53 S 7141.14 W 0.00 8375.12 12000.00 63.40 219.39 6007.06 5054.06 S 7424.87 W 0.00 8766.39 12049.00 63.40 219.39 6029.00 5087.92 S 7452.68 W 0.00 8804.74 Albian-96 12500.00 63.40 219.39 6230.91 5399.59 S 7708.60 W 0.00 9157.66 13000.00 63.40 219.39 6454.75 5745.12 S 7992.33 W 0.00 9548.92 13500.00 63.40 219.39 6678.60 6090.64 S 8276.06 W 0.00 9940.19 13994.53 63.40 219.39 6900.00 6432.40 S 8556.69 W 0.00 10327.18 HRZ 14000.00 63.40 219.39 6902.45 6436.17 S 8559.79 W 0.00 10331.46 14289.38 63.40 219.39 7032.00 6636.15 S 8724.00 W 0.00 10557.91 K-1 14500.00 63.40 219.39 7126.29 6781.70 S 8843.52 W 0.00 10722.73 14631.13 63.40 219.39 7185.00 6872.32 S 8917.93 W 0.00 10825.34 LCU 14874.60 63.40 219.39 7294.00 7040.57 S 9056.09 W 0.00 11015.86 Miluveach A 14899.17 63.40 219.39 7305.00 7057.55 S 9070.03 W 0.00 11035.09 Alpine D 14975.12 63.40 219.39 7339.00 7110.03 S 9113.13 W 0.00 11094.52 CD2-33 PB2 Tgt Rvsd 5-Jun-01 15000.00 63.40 219.39 7350.14 7127.23 S 9127.25 W 0.00 11113.99 15129.24 63.40 219.39 7408.00 7216.54 S 9200.59 W 0.00 11215.13 Base Alpine 15339.20 63.40 219.39 7502.00 7361.64 S 9319.73 W 0.00 11379.43 TD Ail data is in feet unless otherwise stated. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ CD2-33PB2 STANDARD DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB2 Version#Il Last revised : 5-Jun-2001 Coraments in wellpath MD TVD Rectangular Coords. Comment 7000.00 3856 59 1751 25 S 4408.08 W KOP - Sidetrack Pt. 7659.09 4072 7983.59 4208 10563.61 5364 12049 00 6029 13994 53 6900 14289 38 7032 14631 13 7185 14874 60 7294 14899 17 7305 14975 12 7339 15129.24 7408 15339.20 7502 00 2068 94 2278 00 4061 00 5087 00 6432 00 6636 00 6872 00 7040 00 7057 00 7110 00 7216 00 7361 95 S 4939.84 W K-2 49 S 5145.72 W EOC 43 S 6609.78 W Albian-97 92 S 7652.68 W Albian-96 40 S 8556.69 W HRZ 15 S 8724.00 W K-1 32 S 8917.93 W LCU 57 S 9056.09 W Miluveach A 55 S 9070.03 W Alpine D 03 S 9113.13 W CD2-33 PB2 Tgt Rvsd 5-Jun-01 54 S 9200.59 W Base Alpine 64 S 9319.73 W TD Casing positions in string 'A' Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.15 1572.64S 3958.51W 9 5/8" Casing Targets associated with this wellpath Target name Geographic Location T.V.D. Rectangular Coordinates Revised CD2-33 PB2 Tgt Rvsd 362484.000,5967509.000,0.0000 7339.00 7110.03S 9113.13W 5-Jun-2001 CD2-33 PB2 TD Rvsd 5 362295.300,5967276.090,0.0000 7502.00 7346.12S 9297.88W 5-Jun-2001 CD2~33PB2 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2 33PB2 slot #33 Alpine Field North Slope, Alaska PROPOSAL LISTING by Baker Hughes INTEQ Your ref : 33 PB2 Version#ii Our ref : prop4551 License : Date printed : 5-Jun-2001 Date created : 15-Mar-2001 Last revised : 5-Jun-2001 Field is centred on n70 20 37.100,w150 51 37.53 Structure is centred on n70 20 37.100,w151 1 42.976 Slot location is n70 20 18.475,w151 2 27.438 Slot Grid coordinates are N 5974463.385, E 371715.271 Slot local coordinates are 1893.61 S 1522.27 W Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North CD2-33PB2 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc CD~2,33PB2 Alpine Field,North Slope, Measured Inclin Azimuth True Vert Depth Degrees Degrees 0.00 0.00 0.00 100.00 0.00 248.33 200.00 0.00 248.33 300.00 0.00 248.33 400.00 0.00 248.33 500.00 0.00 248.33 600.00 1.00 248.33 700.00 2.00 248.33 800.00 3.00 248.33 900.00 4.00 248.33 1000.00 6.00 248.33 1100.00 8.00 248.33 1200.00 10.00 248.33 1300.00 12.00 248.33 1400.00 14.00 248.33 1500.00 16.00 248.33 1600.00 18.00 248.33 1700.00 20.00 248.33 1800.00 22.00 248.33 1900.00 24.00 248.33 2000.00 26.00 248.33 2100.00 28.00 248.33 2200.00 30.00 248.33 2299.99 33.00 248.33 2399.99 36.00 248.33 2499.99 39.00 248.33 2599.99 42.00 248.33 2699.99 45.00 248.33 2799.99 48.00 248.33 2899.99 51.00 248.33 2999.99 54.00 248.33 3099.99 57.00 248.33 3199.99 .60.00 248.33 3299.99 63.00 248.33 3399.99 66.00 248.33 3499.99 69.00 248.33 3599.99 72.00 248.33 3699.99 75.00 248.33 3711.77 75.35 248.33 4000.00 75.35 248.33 4500.00 75.35 248.33 5000.00 75.35 248.33 5500.00 75.35 248.33 6000.00 75.35 248.33 6500.00 75.35 248.33 7000.00 75.35 248.33 7100.00 73.94 245.59 7200.00 72.56 242.81 7300.00 71.21 239.99 7400.00 69.91 237.12 Alaska RECTANGULAR Depth C 0 0 R D I N A T E S 0.00 0.00S 0.00E 371715.27 100.00 0.00S 0.00E 371715.27 200.00 0.00S 0.00E 371715.27 300.00 0.00S 0.00E 371715.27 400.00 0.00S 0.00E 371715.27 500.00 0.00S 0.00E 371715.27 599.99 0.32S 0.81W 371714.45 699.96 1.29S 3.24W 371712.01 799.86 2.90S 7.30W 371707.93 899.68 5.15S 12.97W 371702.22 999.29 8.37S 21.07W 371694.06 1098.54 12.87S 32.40W 371682.67 1197.30 18.65S 46.93W 371668.03 1295.46 25.69S 64.66W 371650.19 1392.89 34.00S 85.57W 371629.15 1489.48 43.55S 109.62W 371604.94 1585.11 54.34S 136.79W 371577.59 1679.65 66.36S 167.05W 371547.14 1773.01 79.60S 200.35W 371513.62 1865.05 94.02S 236.66W 371477.07 1955.68 109.62S 275.93W 371437.55 2044.77 126.38S 318.12W 371395.08 2132.23 144.28S 363.18W 371349.74 2217.48 163.57S 411.73W 371300.87 2299,88 184.48S 464.36W 371247.90 2379.21 206.95S 520.93W 371190.96 2455.24 230.93S 581.27W 371130.22 2527.77 256.34S 645.24W 371065.84 2596.60 283.12S 712.64W 370998,00 2661.54 311.19S 783,30W 370926,88 2722.41 340.48S 857.02W 370852.68 2779.04 370,90S 933.60W 370775.61 2831,29 402.38S 1012.83W 370695.86 2879.00 434.82S 1094.50W 370613.67 2922.04 468.14S 1178,37W 370529.25 2960.31 502.25S 1264.22W 370442.85 2993.69 537.05S 1351.81W 370354.68 3022.09 572.45S 1440.91W 370265.01 3025.10 576.65S 1451.49W 370254.36 3097.98 679.61S 1710.65W 369993.52 3224.42 858.22S 2160.22W 369541.03 3350.85 1036.82S 2609.79W 369088.54 3477.29 1215.43S 3059.36W 368636.05 3603.72 1394.03S 3508.94W 368183.56 3730.15 1572.64S 3958.51W 367731.07 3856.59 1751.25S 4408.08W 367278.58 3883.07 1788,97S 4496.81W 367189.23 3911.90 1830.64S 4583.01W 367102.35 3943.00 1876.12S 4666.45W 367018,16 3976.28 1925,30S 4746,89W 366936.90 PROPOSAL LISTING Page 1 Your ref : 33 PB2 Version#il Last revised : 5-Jun-2001 GRID C O O R D S GEOGRAPHIC Easting Northing C 00 R D I N A T E S 5974463.39 n70 20 18.47 w151 2 27.44 5974463.39 n70 20 18.47 w151 2 27.44 5974463.39 n70 20 18.47 w151 2 27.44 5974463.39 n70 20 18.47 w151 2 27.44 5974463.39 n70 20 18.47 w151 2 27.44 5974463.39 n70 20 18.47 w151 2 27.44 5974463.08 n70 20 18.47 w151 2 27.46 5974462.15 n70 20 18.46 w151 2 27.53 5974460.61 n70 20 18.45 w151 2 27.65 5974458.45 n70 20 18.42 w151 2 27.82 5974455.37 n70 20 18.39 w151 2 28.05 5974451.07 n70 20 18.35 w151 2 28.38 5974445.54 n70 20 18.29 w151 2 28.81 5974438.79 n70 20 18.22 w151 2 29.33 5974430.84 n70 20 18.14 w151 2 29.94 5974421.70 n70 20 18.05 w151 2 30.64 5974411.37 n70 20 17.94 w151 2 31.43 5974399.86 n70 20 17.82 w151 2 32.32 5974387.19 n70 20 17.69 w151 2 33.29 5974373.39 n70 20 17.55 w151 2 34.35 5974358.45 n70 20 17.40 w151 2 35.50 5974342.41 n70 20 17.23 w151 2 36.73 5974325.27 n70 20 17.06 w151 2 38.04 5974306.81 n70 20 16.87 w151 2 39.46 5974286.80 n70 20 16.66 w151 2 41.00 5974265.28 n70 20 16.44 w151 2 42.65 5974242.33 n70 20 16.20 w151 2 44.41 5974218.01 n70 20 15.95 w151 2 46.28 5974192.38 n70 20 15.69 w151 2 48.25 5974165.51 n70 20 15,41 w151 2 50.31 5974137.47 n70 20 15.12 w151 2 52.47 5974108.35 n70 20 14.82 w151 2 54.70 5974078.22 n70 20 14.51 w151 2 57.02 5974047.16 n70 20 14.20 w151 2 59.40 5974015.27 n70 20 13.87 w151 3 01.85 5973982.62 n70 20 13.53 wlS1 3 04.36 5973949.31 n70 20 13.19 w151 3 06.92 5973915.43 n70 20 12,84 w151 3 09.52 5973911.40 n70 20 12,80 w151 3 09.83 5973812.85 n70 20 11.79 w151 3 17.39 5973641.88 n70 20 10.03 w151 3 30.52 5973470.91 n70 20 08.27 w151 3 43.65 5973299,95 n70 20 06.51 w151 3 56.77 5973128.98 n70 20 04.75 w151 4 09.90 5972958.01 n70 20 02.99 w151 4 23.02 5972787.05 n70 20 01.23 w151 4 36.15 5972750.83 n70 20 00.86 w151 4 38.74 5972710,63 n70 20 00.45 w151 4 41,25 5972666.57 n70 20 00.00 w151 4 43.69 5972618.76 n70 19 59.52 w151 4 46.04 Ail data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33PB2 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD~2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 2 Your ref : 33 PB2 Version~ll Last revised : 5-Jun-2001 Measured Inclin Azimuth True Vert R E C T A N G U L A R G R I D C 0 0 R D S G E O G R A P H I C Depth Degrees Degrees Depth C 00 R D I N A T E S Easting Northing C O 0 R D I N A T E S 7500.00 68.66 234.20 4011.66 1978.05S 4824.12W 366858.80 5972567.33 n70 19 59.00 w151 4 48.29 7600.00 67.46 231.24 4049.02 2034.22S 4897.92W 366784.06 5972512.42 n70 19 58.44 w151 4 50.44 7659.09 66.78 229.46 4072.00 2068.95S 4939.84W 366741.57 5972478.40 nT0 19 58.10 w151 4 51.67 7700.00 66.32 228.22 4088.28 2093.65S 4968.09W 366712.90 5972454.19 n70 19 57.86 w151 4 52.49 7800.00 65.23 225.16 4129.33 2156.18S 5034.45W 366645.51 5972392.79 n70 19 57.24 w151 4 54.43 7900.00 64.21 222.04 4172.04 2221.65S 5096.80W 366582.06 5972328.40 n70 19 56.60 w151 4 56.25 7983.59 63.40 219.39 4208.94 2278.49S 5145.72W 366532.19 5972272.39 n70 19 56.04 w151 4 57.67 8000.00 63.40 219.39 4216.29 2289.83S 5155.03W 366522.69 5972261.22 n70 19 55-93 w151 4 57.95 8500.00 63.40 219.39 4440.14 2635.36S 5438.76W 366233.18 5971920.56 n70 19 52.53 w151 5 06.22 9000.00 63.40 219.39 4663.98 2980.88S 5722.49W 365943.67 5971579.91 n70 19 49.13 w151 5 14.49 9500.00 63.40 219.39 4887.83 3326.41S 6006.22W 365654.17 5971239.25 n70 19 45.72 w151 5 22.77 10000.00 63.40 219.39 5111.68 3671.94S 6289.95W 365364.66 5970898.60 n70 19 42.32 w151 5 31.04 10500.00 63.40 219.39 5335.52 4017.47S 6573.68W 365075.15 5970557.94 n70 19 38.92 w151 5 39.31 10563.61 63.40 219.39 5364.00 4061.43S 6609.78W 365038.32 5970514.60 n70 19 38.49 w151 5 40.37 11000.00 63.40 219.39 5559.37 4363.00S 6857.41W 364785.65 5970217.29 n70 19 35.52 w151 5 47.58 11500.00 63.40 219.39 5783.22 4708.53S 7141.14W 364496.14 5969876.63 n70 19 32.12 wlS1 5 55.86 12000.00 63.40 219.39 6007.06 5054.06S 7424.87W 364206.63 5969535.98 n70 19 28.72 w151 6 04.13 12049.00 63.40 219.39 6029.00 5087.92S 7452.68W 364178.26 5969502.59 n70 19 28.38 w151 6 04.94 12500.00 63.40 219.39 6230.91 5399.59S 7708.60W 363917.13 5969195.32 n70 19 25.32 w151 6 12.39 13000.00 63.40 219.39 6454.75 5745.12S 7992.33W 363627.62 5968854.67 n70 19 21.91 w151 6 20.66 13500.00 63.40 219.39 6678.60 6090.64S 8276.06W 363338.11 5968514.01 nT0 19 18.51 w151 6 28.93 13994.53 63.40 219.39 6900.00 6432.40S 8556.69W 363051.77 5968177.08 n70 19 15.15 w151 6 37,11 14000.00 63.40 219.39 6902.45 6436.17S 8559.79W 363048.60 5968173.36 n70 19 15.11 w151 6 37.20 14289.38 63.40 219.39 7032.00 6636.15S 8724.00W 362881.05 5967976.20 n70 19 13.14 w151 6 41.98 14500.00 63.40 219.39 7126.29 6781.70S 8843.52W 362759.10 5967832.70 n70 19 11.71 wl51 6 45.46 14631.13 63.40 219.39 7185.00 6872.32S 8917.93W 362683.17 5967743.36 n70 19 10.82 w151 6 47.63 14874.60 63.40 219.39 7294.00 7040.57S 9056.09W 362542.20 5967577.48 n70 19 09.16 w151 6 51.66 14899.17 63.40 219.39 7305.00 7057.55S 9070.03W 362527.97 5967560.74 n70 19 08.99 w151 6 52.06 14975.12 63.40 219.39 7339.00 7110.03S 9113.13W 362484.00 5967509.00 n70 19 08.48 w151 6 53.32 15000.00 63.40 219.39 7350.14 7127.23S 9127.25W 362469.59 5967492.05 n70 19 08.31 w151 6 53.73 15129.24 63.40 219.39 7408.00 7216.54S 9200.59W 362394.76 5967403.99 n70 19 07.43 w151 6 55.86 15339.20 63.40 219.39 7502.00 7361.64S 9319.73W 362273.19 5967260.94 n70 19 06.00 w151 6 59.34 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #33 and TVD from RKB (Doyon 19) (52.00 Ft above mean sea level). Bottom hole distance is 11876.50 on azimuth 231.69 degrees from wellhead. Total Dogleg for wellpath is 104.86 degrees. Vertical section is from S 0.00 E 0.00 on azimuth 248.33 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ CD2-33PB2 COORDINATE DIRECTIONAL PLAN Phillips Alaska, Inc. CD#2,33PB2 Alpine Field,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref : 33 PB2 Version#il Last revised : 5-Jun-2001 Comments in wellpath ==================== MD TVD Rectangular Coords. Comment ........................................................................................................... 7000.00 3856.59 1751.25S 4408.08W KOP - Sidetrack Pt. 7659.09 4072.00 2068.95S 4939.84W K-2 7983.59 4208.94 2278.49S 5145.72W EOC 10563.61 5364.00 4061.43S 6609.78W Albian-97 12049.00 6029.00 5087.92S 7452.68W Albian-96 13994.53 6900.00 6432.40S 8556.69W HRZ 14289.38 7032.00 6636.15S 8724.00W K-1 14631.13 7185.00 6872.32S 8917.93W LCU 14874.60 7294.00 7040.57S 9056.09W Miluveach A 14899.17 7305.00 7057.55S 9070.03W Alpine D 14975.12 7339.00 7110.03S 9113.13W CD2-33 PB2 Tgt Rvsd 5-Jun-01 15129.24 7408.00 7216.54S 9200.59W Base Alpine 15339.20 7502.00 7361.64S 9319.73W TD Casing positions in string 'A' ============================== Top MD Top TVD Rectangular Coords. Bot MD Bot TVD Rectangular Coords. Casing 0.00 0.00 0.00S 0.00E 6500.00 3730.15 1572.64S 3958.51W 9 5/8" Casing Targets associated with this wellpath ===================================== Target name Geographic Location T.V.D. Rectangular Coordinates Revised ........................................................................................................... CD2-33 PB2 Tgt Rvsd 362484.000,5967509.000,0.0000 7339.00 7110.03S 9113.13W 5-Jun-2001 CD2-33 PB2 TD Rvsd 5 362295.300,5967276.090,0.0000 7502.00 7346.12S 9297.88W 5-Jun-2001 WELL PERMIT CHECKLIST FIELD & POOL WELL NAME_~Z)~ -:3.,~,/~ PROGRAM: exp.,~"_ dev / ' a_c~?~/9( ~_/Z.~ 'L AREA ADMINIS¥~.TION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. D TE .. 13,. COMPANY INIT CLASS ENGINEERING TE 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from drilling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available, in drilling unit ............ If deviated, is wellbore plat included ............. ... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can-be issued without administrative approval ...... Can permit be approved before 15-day wait ........... Y N Y N ~N ~N Conductor string provided ................... Surface casing protects all known USDWs ........... CMT vol adequate to circulate on conductor & surf csg ..... CMT vol adequate to tie-in long string to surf csg .... .... CMT will cover all known productive horizons ..... ' ..... Casing designs adequate for C, T, B & permafrost ....... Adequate tankage or reServe pit ................. If a re-drill, has a 10-403 for abandonment been approved... Y... N Adequate wellbore separation proposed. 7. N If diverter required, does it meet regulations ...... ' ~ N Drilling.fluid program schematic & equip list adequate. ;;;; N BOPEs, do they meet regulation ' ~ N BOPE press rating appropriate; t;st' t;' "~ ~"~ o ..... I~sigl N Choke manifold complies w/APl RP-53 (May 84) ......... Y N Work will occur without operation shutdOwn ........... Y N redrll serv wellbore seg ann. disposal para req-~ UNIT# ~C'fi~'. 3 ~ ON/OFF SHORE o 4 J .. Is presence of H,S gas probable ................. Y N GEOLOGY 30. pe~it ~n be issued w/o hydrogen sulfide measures ...... Y N 32.31 .' seismicData presented OnofpOtentialshallow ove~ressure zones ....... Y 33, Seabed ~ndition suwey (if off-shore) ............. · ~. Conta~ name/phone for weekly progress repo~s [~plorato~ onl~ Y N ANNU~R DISPOSAL35. With proper cementing records,.this plan (A) will ~ntain waste in a suit~.ble~mceiving zone~ ....... Y N ' AP~ P~E . , (B) will not ~ntami,~at~'fF&'~ater; ;~:'~use ddlling waste... Y N ,. ~1 (C) wi, b"6{impairmechani~lintegfi, ofthewellusedforaJ'posa!; Y' N.,. / ~k ~0,~"~[I not damage producing fo~ation or impair recove~ from a ....... Y'""""~ / ~~~ pool; .and (E). will not circumvent 20 ~C 25.252 or 20 ~C 25.412. Y N GEOEO~¥: ENGINEERING:. ' UlClAnnular COMMISSION: JMH · - Comments/Instructions: 0 Z 0 c:~nsoffice\wordian~diana\checklist (rev. 11101fl00)