Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
201-101
RECEIVED • STATE OF ALASKA DEC 18 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND Ldp ICC la. Well Status: ❑Oil 0 Gas ❑SPLUG ❑ Other ®Abandoned El Suspended 1b. Well Class ' 20AAC 25 105 20AAC 25 110 ❑ Exploratory ❑Stratigraphic El GINJ Cl WINJ ❑WAG ❑WDSPL El Other No.of Completions Zero • ® Development ❑Service 2. Operator Name: 5. Date Comp..Susp.,t�or Aband.: 12. Permit to Drill Number BP Exploration (Alaska) Inc. 11/30/2014 201-101 • 314-462 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 8/1/2001 50-029-21832-02-00 • 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 8/4/2001 PBU Y-14B 492' FNL, 706' FWL, Sec. 34,T11N, R13E, UM 8. KB(ft above MSL): 85' 15. Field/Pool(s) Top of Productive Horizon: 4292' FNL, 361' FEL, Sec. 33, T11N, R13E, UM GL(ft above MSL): 49.6' Prudhoe Bay/Prudhoe Bay - Total Depth: 9. Plug Back Depth(MD+TVD) 124' FNL, 1472' FEL, Sec. 04, T1ON, R13E, UM 6024' • 5735' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: . Surface: x- 645503 y- 5949777 Zone- ASP4 12171' . 9038' - ADL 028287&047471 TPI: x- 644516 y- 5945957 Zone- ASP4 11. SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 643429 Y- 5944825 Zone- ASP4 None 18. Directional Surve y: ❑Yes ® No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD, GR 11291' - 9000' • 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" Insulated Conductor 33' 113' 33' 113' 8 yds Concrete 13-3/8" 68# L-80 32' 2686' 32' 2685' 17-1/2" 3723 cu ft Arcticset II and III 9-5/8" 47# L-80 Surface 9421' Surface 8325' 12-1/4" 2116 cu ft Class'G', 864 sx Class'G' 2005' 7" 29# L-80 9243' 10541' 8181' 8979' 8-1/2" 298 cu ft Class'G' 4-1/2" 12.6# L-80 10398' 11300' 8964' 9000' 6" Uncemented Slotted Liner 24. Open to production or injection'? ❑Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom; Perforation Size and Number): 4-1/2", 12.6#, L-80 6542'- 10093' 10036'/8789' 26. ACID, FRACTURE,CEMENT SQUEEZE, ETC. !. I'? i 14 WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ® No DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED I SCOW FEB 2 0 2015 4 See Attached 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ® No Sidewall Core(s)Acquired'? ❑Yes ® No If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 y71 2/6 //,j CONTINUED ON REVS SE A��911 IAN - C� j SNbmit Original Only - -o +Yf , .;& y �` G 29. GEOLOGIC MARKERS(List all formations art kers encounter 30. FORMATION TESTS { NAME vu) ND Well Tested? J Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Top of Sadlerochit 10515' 8977' None Top of Sadlerochit 11403' 8991' Top of Sadlerochit 11520' 8990' Top of Sadlerochit 11549' 8989' Formation at Total Depth: 31.List of Attachment Summary of Daily Drilling Reports,Well Schematic Diagram, Surveys,Cement Report 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: David Minge,564-4061 Email: David.Minge@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist \ ^ �, / Signature: \I' Phone 564-4091 Date: 11i/��/1T INSTRUCTIONS General. This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la. Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. 11 Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23. Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28. Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only 4 WELL NAME: Y-14B 26. Acid, Fracture, Cement Squeeze, Etc. Depth Interval (MD) Amount & Kind of Material Used 9653' 40 Bbls Class 'G' 7530' 111 Bbls Class 'G' 6542' Tubing Cut and Pulled 6046' Set EZSV 6024' Set Whipstock Y-14B, Well History (Pre-Rig Sidetrack) Date Summary 09/20/14 PULL 4 1/2"WRP FROM 9,026 SLM (9,052' MD). (WRP recovered intact). DRIFTED w/2"CENT, 1-3/4" SAMPLE BAILER TO DEVIATION @ 10,309' SLM. (no sample recovered). 09/28/14 ***Fullbore/SLB CMT P&A Stage#1***SLB arrive on location and open Work Permit. R/U to Y-14. Found bad suction valve in pump head while priming up. Postponed job. 09/29/14 R/U SLB and Inspect equipment. Hold PJSM. Start Stage#1 of Fullbore P&A by pumping 10 bbls 60/40 Meth, 350 bbls 1% KCI, and 40 bbs of 15.8 ppg Class"G"CMT with a lap UCA of 2000 psi compressive strength at 13.5 hours. Continue by clearing Tree of CMT w/2 bbls Fresh Water, drop two 7" Foam Wiper Balls, Chase w/another 7 bbls Fresh Water, Displace CMT w/93 bbls DSL("H" Head started leaking DSL into CMT Pump Van), 20 bbls Fresh Water, and 24.5 bbls DSL. CMT squeezed off at the perfs. Held a 2000 psi squeeze for 30 minutes before bleeding off to 500 psi to put CIP at 19:31 hrs. Estimated TOC © 9800'. Open- MV, IA, ON Closed- SSV, SV, WV. Final Wellhead Pressure T/IA/OA=500/0/0 psi. 10/02/14 BRUSHED TREE AND BPV PROFILE FOR 30 MIN W/4-1/2" BRUSH &3.80"G.RING. DRIFTED TBG W/2.0" S.BAILER& 1-3/4" S. BAILER,TAGGED SOFT FILL AT 9,653' SLM (recovered sample of cement). PERFORMED PASSING MIT-T TO 2,500#W/TRIPLEX(tubing lost 103psi, 36psi) SET 4-1/2"WCS ON KB PKR AT 9,065'SLM (9,091' MD). PULLED RK-DGLV FROM STA.#2 AT 9,000' SLM (9,012' MD). PULLED EMPTY CATCHER FROM 9,065'SLM (9,091' MD). RE-BRUSHED TREE& BPV PROFILE FOR 10MIN W/4-1/2" BRUSH &3.80" G.RING. ***WELL LEFT S/I, PAD OP NOTIFIED ON DEPARTURE***. 10/07/14 T/1/0=1400/100/0. Temp=S/I.Assist Shlumberger Cement Crew with flowline freeze protect of well Y-36 (Side Track). F-protect Y-36 F-line WOA recipe 94 bbls of 70*crude& 10 bbls of meth shut IGV& psi up to 870 psi with .3 bbl of meth Wing shut swab shut ssv shut master open casing valves open to gauges Final Whp's=1400/100/0. 10/07/14 **"Fullbore/SLB CMT P&A***SLB arrive on location and open work permit. R/U SLB to Y-14. PJSM. Perform CMT P&A w/10 bbls 60/40 Meth Spear, 530 bbls 1% KCI wellbore sweep, 160 bbls DSL IA Freeze Protect, 262 bbls 1% KCI, 111 bbls 15.8 ppg Class"G" CMT, 2 bbls Fresh Water, Drop wiper balls, 5 bbls Fresh Water, 68 bbls 1% KCI, and 38 bbls DSL TBG Freeze Protect. FWHP=T/IA/OA 397/325/0 psi Open- MV, IA, OA Closed- SSV, WV, SV. Length of CMT Plug- 1614'. Depth of CMT Plug- 7398'. Type of CMT- Class"G". Wt of CMT Slurry- 15.8 ppg. Volume of CMT Slurry Pumped- 111 bbls. UCA- 12:58 hrs=2000 psi. 10/07/14 T/I/O = SSV/100/0. Temp=SI. WHPs (Eval SC leak).AL SI @ casing valve (0 psi). Crude in flutes, 5 1/2" at lowest point. Small amount of crude in cellar containment. DSO is aware of situation. LRS in control well. 10/09/14 BRUSH BPV-PROFILE W/4-1/2" BLB, 4-1/2" BLB, 3.25" G-RING. 10/10/14 T/1/0=298/vac/vac Temp= S/I. Assist Slickline (Side Track/Post Cement Job) CMIT-TxIA 3500 psi **FAILED** Pumped 11 bbls of 20*diesel down IA with jumper to equalize TxIAP 1st test 1st 15 min T/IA lost 97/94 psi 2nd 15 min T/IA lost 65/67 psi for a total of T/IA loss 162/161 psi in 30 min RE psi w/.4 bbl of diesel 2nd test 1st 15 min T/IA lost 54/58 psi 2nd 15 min T/IA lost 54/53 psi for a total T/IA loss of 108/111 in 30 min RE psi with .2 bbl diesel 3 rd test 1st 15 min T/IA lost 52/53 psi 2nd 15 min T/IA lost 48/49 psi for a total T/IA loss of 100/102 psi in 30 min RE psi with .3 bbl diesel 4 th test 1st 15 min T/IA lost 44/40 psi 2nd 15 min T/I lost 41/40 psi for a total T/IA loss of 85/80 psi in 30 min LLR to small for big pump Calculated leak off rate @ .28 gallons per min. Bleed TxIAP down bleed back aprox. 6.3 bbls diesel AFE sign hung Wing shut swab shut ssv shut master open casing valves open to gauges Final W h p's=261/262/0, Page 1 of 2 Y-14B, Well History (Pre-Rig Sidetrack) Date Summary 10/10/14 DRIFT W/3.70" CENT AND 2.50" SAMPLE BAILER TO 7,512' SLM. TAG TOP OF CEMENT @ 7,530' SLM W/2.50" SAMPLE BAILER. 10/10/14 T/1/O=423/416Nac, Temp=S/I, MIT-T PASSED to 3500 psi; MIT-IA FAILED (2 attempts)to 3500 psi (Pre Rig) Pressured up tubing with 1.5 bbls meth to reach 3531 psi. MIT-T lost 88 psi in 1st 15 minutes and 43 psi in 2nd 15 minutes for a total loss of 131 psi in a 30 minute test. Bled down tubing to 1000 psi. Rig up to IA. Pressured up IA with 5.5 bbls meth to reach test pressure of 3507. MIT-IA lost 62 psi in 1st 15 minutes and 50 psi in 2nd 15 minutes for a total loss of 112 psi in a 30min test period. Bled down tubing and IA to 250 psi—6 bbls. FWHP's=235/226/0 Valve positions: SV/WV/SSV= Closed, MV= Open, IA,OA= OTG. ***Tags hung on wing and IA valves,AFE sign on master valve***. 10/16/14 T/I/O= 193/231/vac MIT IA PASSED to 3500 psi Pressured Tbg. to 1000 psi. Pumped 6 bbls diesel down IA to reach test pressure. 1st 15 min loss of 102 psi 2nd 15 min. loss of 51 psi **pass**keep monitoring presure per WIC. 10/17/14 Monitored IAP for total of 4 hours. See log for details. FWHP=200/200/vac SV,WV,SSV shut MV,IA,OA hung. Tags hung on IA,WV,AFE sign hung. 10/27/14 INITIAL T/I/O=200/100/0. RIH. OPEN SSV AND SWAB. BARRIERS: PACKOFF AND WHE; TOOLSTRING: HEAD/WEIGHTS WITH 4"CENTRALIZER/CCL/SHOCK ABSORBERS WITH TWO 4" CENTRALIZERS/3.65" POWERCUTTER; LENGTH =34';WEIGHT=300 LBS; MAX OD= 3.65" SHOOT. CUT DEPTH =6542'; CCL TO CUTTER= 10.58'; CCL STOP DEPTH =6531.42'; TUBING PRESSURE =200 PSI; IA PRESSURE = 100 PSI; GOOD INDICATION VIA TENSION. IA PRESSURE DROPPING. HOOKING UP TRIPLEX AND GOING TO PUMP ON TUBING FOR A MINUTE IN ORDER TO OBTAIN A DEFINITE INDICATION. RIG DOWN. FINAL T/I/O =0/0/0. 10/28/14 T/I/0=63/31/0 SI Perform CMIT(SIDETRACK) CMIT TxIA to 3500 psi FAIL Attempt 3 CMIT-T/IA Pumped 8 bbls DSL down IA to achieve test pressure of 3500 psi TxIA. 15 min loss 34/35 psi, second 15 min loss 28/29 psi, third 15 min loss 26/25 for total loss of 88/89 psi in 45 mins. Bleed TxIA to 300 psi. PE/Pad Op notified Valve positions=SV WV SSV closed MV open CVs OTG AL closed FWHP=300/300/0. 10/28/14 T/I/O =63/31Nac. Temp = SI. Hold open bleed on OA. (Assist LRS). OA FL near surface. Held open bleed on OA during LRS MIT-IA. No observable activity from conductor or returns to slop tank. Monitored during rig down. Final WHPs= 300/300/0. LRS in control of well on departure. 15:15. 11/01/14 T/I/O =428/400/0. Temp= SI. CMIT-TxIA to 3500 psi**PASSED**(Pre rig). No AL,flowline, wellhouse, scaffolding. Maintain open bleed on OA. Vac truck in place. Start pumping down IA. 11/02/14 CMIT-TxIA to 3500 psi *PASSED*(Pre rig). Used 6.35 bbls DSL to increased T/IAP to 3500 psi before midnight. On 4th test,T/IA lost 24/24 psi in 1st 15 min, 19/19 psi in 2nd 15 min,for a total loss of 43/43 psi in 30 min. Bled TxIAP to 280/270 psi (6.7 bbls). MIT tags hung. Fluid Packed Annulus sign already hung. FWHPs=280/270/0. SV, WV, SSV=C. MV=0. IA, OA= OTG. NOVP. 0330. 11/16/14 T/I/0=420/420/0. Set 4" CIW H-TWC#427. Removed upper tree and installed (temp valve#31)dry hole tree conversion. Torqued and PT'd. RDMO. Page 2 of 2 North America-ALASKA-BP Page 1 0129 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/17/2014 06:00 - 12:00 6.00 MOB P PRE COMPLETE P&A OPERATION ON WELL#38 -RIG DOWN AND MOVE OFF TO THE SIDE OF LOCATION TO DO SOME PLANNED PRE-WELL WORK FOR UPCOMING SIDETRACK !OPERATIONS. -WELDER TO INSTALL 3"KILL LINE IN CELLAR WITH 3"SHOCK HOSE.TO REPLACE 2"LINE DRILL SITE MAINT PERFORMING PRE-RIG WORK. -MEET WITH Y-PAD DSO,WELL#6 TO UNLOCK,LOCK WELL#10 AT MASTER -OBTAIN WWTP FOR WELL Y-14C:DSO AGREED ON LOCATION OF WSL OFFICE OUT OF RED ZONE OF RIG AND MANIFOLD BUILDING. -MADE 24 HR NOTIFICATION FOR UPCOMING INITIAL BOPE TEST FOR WELL 14C. 12:00 - 19:00 7.00 MOB I P PRE I DRILL SITE MAINT STILL PRE PING Y-14C -INSTALLING PIGGY BACK ANNULUS VALVES &TESTING. LAYING RIG MATS AROUND THE WELL SIMOPS:WELDER FIXING ACCESS COVER TO DRIP PAN AREA ON OFF DRILLERS SIDE 19:00 - 21:30 2.50 MOB P PRE POSITION RIG OVER WELL Y-14C -PJSM. -CONTACT DSO TO WITNESS RIG MOVING OVER WELL. "DSO WAIVE WITNESS RIG MOVING OVER WELL. -FUNCTION TEST ESD ON MOVING SYSTEM BEFORE MOVING RIG OVER WELL. TEST PASS. -POSITION AND CENTER RIG OVER WELL, USING CREEP MODE SYSTEM. -LEVEL AND SHIM RIG. -INSTALL HANDRAILS AND STAIRS AROUND RIG. 21:30 - 22:30 1.00 MOB P PRE SKID RIG FLOOR. -PJSM. -PREPARE AND SKID RIG FLOOR INTO DRILLING POSITION. *SIMOPS: -PJSM WITH RIG CREWAND HARD LINE CREW. -HARDLINE CREW,R/U HARDLINE FROM SKID 'MANIFOLD TO FLOWBACK TANK. -HARDLINE CREW,PRESSURE TEST HARDLINE FORM SKID MANIFOLD TO FLOWBACK TANK TO 250/4,000 PSI FOR 5 CHARTED MINS EACH-GOOD LEAK TIGHT TEST. 22:30 - 00:00 1.50 RIGU P PRE RIG UP RIG EQUIPMENT. -R/U RIG FLOOR AND SERVICE LINES. -PREPARE AND SKID OUT CONVEYOR#2. -TAKE ON 120 DEG 8.5 PPG SEAWATER -POSITION AND R/U BREAK TRAILER AND BULK FUEL TANK. Printed 12/1/2014 1:00:31PM North America-ALASKA-BP Page 2 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/18/2014 00:00 - 03:00 3.00 RIGU P PRE RIG UP RIG EQUIPMENT. -R/U RIG FLOOR AND SERVICE LINES. -PREPARE AND SKID CONVEYOR#2. -SPOT ROCKWASHER. -R/U LINES FOR DISPLACEMENT OF FREEZE PROTECT. R/U COMMUNICATIONS IN WSL OFFICE. '*SIMOPS: PJSM WITH CH2 VAC-TRUCK OPER. -PREPARE MUD PITS AND TAKE ON 120°8.5 PPG SEAWATER *RIG ACCEPTED AT 00:01 03:00 - 04:00 1.00 DHB P PRE PRESSURE TEST TWC -FROM ABOVE AND BELOW-250 LOW&3500 PSI HIGH,5 CHARTED MIN.-GOOD TESTS 04:00 - 05:00 1.00 RIGU P PRE H2S/RIG EVACUATION DRILL -SIMULATED H2S RELEASE,WITH A MAN DOWN LEADING TO RIG EVACUATION, ALL HANDS RESPONDED ACCORDINGLY- FOLLOWED BY AAR 05:00 - 06:00 1.00 WHSUR P DECOMP RIG DOWN DRY HOLE TREE&ADAPTER FLANGE -PJSM FOR N/D OPERATION WITH DDI CREW AND CAMERON-REVIEW HAZARDS AND PROCEDURE FOR RIGGING DOWN. -CLEAN TOP OF HANGER AND REPLACE RING GASKET. -CAMERON TO BLEED CONTROL LINES AND HANGER VOID PRIOR TO N/D.HANGER THREAD-GOOD -INSPECT THREADS AND M/U HANGER XO, 10 TURNS TO LEFT. -REMOVE HANGER XO. -BREAK TREE AND ADAPTER FLANGE AND SEND OUT 06:00 - 15:30 9.50 BOPSUR P DECOMP ,NIPPLE UP 13-5/8"BOPE PJSM FOR NIPPLE UP OPERATIONS: REVIEW DDI PROCEDURE,DISCUSS OUT OF SCOPE WORK FOR REPOSITIONING THE STACK TO BETTER FIT NEW 3"KILL LINE. -RE-CONFIGURE ANCHOR POINTS IN CELLAR AND REMOVE BOP STACK YOKE, REMOVE ANNULAR AND REPOSITION ON TOP OF THE STACK -INSTALL YOKE AND-N/U BOPE AND INSTALL RISER. -PJSM FOR N/U BOPE,DISCUSS LIFTING HAZARDS AND DROPPED OBJECTS. 15:30 - 17:30 2.00 BOPSUR P DECOMP RIG UP BOPE TEST EQUIPMENT - PERFORM TABLE TOP KICK WHILE DRILLING DRILL -H2S DRILL,RIG EVACUATION WITH AAR CONDUCTED POST DRILL. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 3 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UW:500292183200 Active datum:Y-14C actual©83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 19:00 1.50 BOPSUR P DECOMP PRESSURE TEST NEW 3"KILL LINE -PJSM ON TESTING BOPE,WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. 250 PSI/5000 PSI 5 MIN EA-TEST PASS -BODY TEST ON BOP.-TEST PASS -CHECKED FILL ON GAS BUSTER,TOOK 6 BBLS TO FILL 19:00 - 00:00 5.00 BOPSUR P • DECOMP TEST 13-5/8"BOPE I-PRESSURE TEST 13-5/8"5M BOPE. 1-PJSM ON TESTING BOPE,WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. -TEST BOPE AS PER DDI SOP. -TEST ANNULAR PREVENTER WITH 4"TEST JT TO 250/3,500 PSI FOR 5 CHARTED MINS EACH. TEST PASS. -TEST BOPE WITH 4", 4-1/2"&9-5/8" TEST JTS TO 250/3,500 PSI FOR 5 CHARTED MINS EACH. -PERFORM ACCUMULATOR DRAW DOWN -TEST. ALL TEST PASS BP TEST CRITERIA FOR BOPE TESTING -NO FAILURES -TEST ALL GAS ALARMS.TEST PASS -SEE ATTACHED TEST CHARTS PERFORMED 4 MPL RAM LOCK TESTS:3500 PSI TESTS NOT CHARTED-ALL TESTS PASS -9-5/8"UPPER RAMS,BLIND SHEARS, LOWER VBRS TESTED W/4"&4-1/2"TEST JOINTS - 2 HRS EXTRA TIME TO PERFORM MPL RAM LOCK TESTS JOHN CRISP WAIVED WITNESS 11-18-14 13:00 OA=0 PSI -ZERO LOSSES THIS TOUR rt Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 4 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UW:500292183200 Active datum:Y-14C actual©83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/19/2014 00:00 - 03:00 3.00 BOPSUR P DECOMP TEST 13-5/8"BOPE -PRESSURE TEST 13-5/8"5M BOPE. -PJSM ON TESTING BOPE,WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. -TEST BOPE AS PER DDI SOP. -TEST ANNULAR PREVENTER WITH 4"TEST JT TO 250/3,500 PSI FOR 5 CHARTED MINS EACH. TEST PASS. -TEST BOPE WITH 4", 4-1/2"&9-5/8" TEST JTS TO 250/3,500 PSI FOR 5 CHARTED MINS EACH. TEST PASS -PERFORM ACCUMULATOR DRAW DOWN TEST. TEST PASS. ALL TEST PASS BP TEST CRITERIA FOR BOPE TESTING NO FAILURES -TEST ALL GAS ALARMS.TEST PASS -SEE ATTACHED TEST CHARTS *JOHN CRISP WAIVED WITNESS 11-18-14 '13:00 03:00 - 03:30 0.50 BOPSUR P DECOMP RIG DOWN BOPE TEST EQUIPMENT CLEAN AND CLEAR RIG FLOOR -MAKE UP X-OVERS FOR SAFETY VALVES 03:30 - 06:00 • 2.50 DHB P DECOMP RETRIEVE 4"TYPE"H"TWC -PJSM FOR PICKING UP LUBRICATOR AND PRESSURE TESTING WITH DDI&DSM CREW. REVIEW PROCEDURE AND DISCUSS LIFTING OPERATIONS WITH EMPHASIS ON EXCLUSION ZONE AT THE BEAVER SLIDE. TEST LUBRICATOR AND DUTCH RISER AGAINST TWC -BRING DRILL SITE MAINTENANCE LUBRICATOR TO RIG FLOOR. -MOBILIZE CONTROL LINE SPOOL AND TOOLS TO RIG FLOOR. -PJSM WITH DSM AND DOYON PERSONNEL. -RIG UP AND TEST DUTCH RISER& LUBRICATOR 250/3500 PSI FOR 5 MIN/5 MIN. -RIG DOWN TEST EQUIPMENT. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 5 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:30 6.50 CLEAN P DECOMP CIRCULATE OUT FREEZE PROTECT WITH 8.5 PPG SEAWATER. -PJSM FOR CIRCULATION:ENSURE PROPER LINE UP TO THE FLOW BACK TANK,ENSURE FLOW BACK TANK IS EMPTY,VERYIFY AND TEST LINES AND MANIFOLD TO 250 LOW/ 3500 PSI HIGH-TEST GOOD-LEAK TIGHT PUMP DOWN THE IA TAKING RETURNS UP THE TUBING OUT TO THE FLOW BACK TANK 5 BPM WITH 1000 PSI PUMP PSI ,TOTAL 60 BBLS PUMPED -SHUT DOWN LINE UP TO CIRCULATE DOWN THE TUBING TAKING RETURNS THROUGH THE IA OUT TO THE FLOW BACK TANK -5 BPM WITH 750 PSI PUMP PRESSURE,MAX 200 PSI DOWN STREAM OUT TO THE FLOW BACK TANK. '-8.5 PPG SEAWATER *TOTAL OF 455 BBLS PUMPED -SHUT DOWN AND MONITOR WELL 10 MIN- WELL STATIC. **SIMOPS:SLB MWD'S HOOKING UP SENSORS TO THE MUD MANIFOLD AND STAND PIPE -PJSM WITH CREW AND SLB TO ENSURE HAZARDS ARE DISCUSSED AND JOB PLAN REVIEWED. 12:30 - 14:00 1.50 PULL P DECOMP PULL TUBING HANGER -PJSM FOR HANGER PULLING OPERATIONS: W/DDI CREW AND CAMERON REP -CAMERON REP TO BOLDS, -PU 4-1/2"LANDING JOINT WITH TDS(XO) MADE UP,RIH AND MAKE UP TO THE HANGER 10 TURNS VERIFIED CORRECT BY CAMERON REP. PULLED HANGER FREE WITH 125K,STRING WEIGHT-120K -CIRCULATE BOTTOMS UP-WITH 10 BPM 390 PSI- -8.5 PPG SEAWATER. -NO GAS OR HYDROCARBONS OBSERVED AT BOTTOMS UP **SIMOPS:RU SLB CONTROL LINE SPOOLER. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 6 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 22:30 8.50 PULL P DECOMP POOH WITH 4-1/2"NSCT COMPLETION TUBING WITH 2 CONTROL LINES -PJSM WITH CREWAND SLB. -PULL HANGER TO THE RIG FLOOR AND LAY DOWN.MAKE UP FOSV AND XO. BLOW DOWN TOP DRIVE -POOH F/6,542'MD TO 4,425'-TO THE SSSV.- -SPOOLING THE CONTROL LINES WITH SLB SPOOLER. UP WT 120K,DN WT 110K. TERMINATE THE CONTROL LINES AND LAY DOWN THE SLB SPOOLER. `ENSURE SLIPS ARE COVERED PRIOR TO REMOVING CLAMPS WITH AIR CHISEL. MONITORING TRIP ON THE TRIP TANK- CORRECT HOLE FILL OBSERVED. CONTINUE PULLING AND LAYING DOWN 4-1/2"TBG FROM 4,425'TO SURFACE -PUW-95K,SOW-95K - MONITOR TRIP OUT ON THE TRIP TANK- CORRECT HOLE FILL OBSERVED. RECOVERED TOTAL 54 STAINLESS STEEL .BANDS,1-SSSV&2-GLMS& 4.40'CUT JOINT W/5"FLARE-MATCHES UP WITH ORIGINAL COMPLETION TALLY. HELD A KICK WHILE TRIPPING DRILL WHILE PULLING COMPLETION: -CONDUCTED AAR WITH 2 ACTION ITEMS ASSIGNED TO DDI FOR IMPROVEMENT. PHASE 2 WEATHER CALLED AROUND 22:00.- WSL'S AND TP CONDUCTED A HAZARD ASSESSMENT FOR JOURNEY MANAGEMENT FOR CREW CHANGE OUT. *RIG HAD ALREADY PREPARED BY TOPPING OFF FUEL AND WATER AT THE RIG 22:30 - 00:00 1.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -CLEAR RIG FLOOR OF 4-1/2"TUBING HANDLING EQUIPMENT. -PREPARE FOR UPCOMING 9-5/8" CLEAN-OUT RUN. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 7 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual©83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/20/2014 00:00 - 04:00 t 4.00 CLEAN P DECOMP MAKE UP 8-1/2"CLEAN-OUT BHA#1. -PJSM FOR BEAVER SLIDE OPERATIONS AND M/U BHA,WITH RIG CREW AND BAKER REP. -CLEAN AND CLEAR RIG FLOOR OF 4-1/2" HANDLING EQUIPMENT. -MOBE CLEAN-OUT BHA COMPONENTS TO RIG FLOOR. -R/U AND INSTALL WEAR BUSHING. *LENGTH=10-1/2", OD=13-1/2", ID=9-1/4" -P/U AND M/U CLEAN-OUT BHA. 8.5"OD TRI CONE BIT -2 X 7"OD BOOT BASKETS -BIT SUB-6-3/8"OD -SMOOTH OD MILL-8.5"OD 6-1/4"BOWEN BUMPER SUB -6-1/4"X-O SUB -(6)6-1/4"DC'S-6-1/4"OD -RIH WITH CLEAN-OUT BHAAND TAG AT 58' (14'BELOW WELL HEAD)WITH 6-7K DOWN. -ATTEMPT TO WORK THROUGH TIGHT SPOT 2x WITH NO SUCCESS. -NOTIFY ODE AND DISCUSSED PLAN FORWARD. PLAN FORWARD:POOH AND L/D 8-1/2" SMOOTH OD STRING MILL. RIH WITH 8-1/2" CLEAN-OUT BHA#2,WITHOUT 8-1/2"SMOOTH OD STRING MILL. ASSEMBLY COMPONENTS FOR CONTINGENCY BHA CONFIGURATIONS. -POOH AND L/D 8-1/2"SMOOTH OD MILL. -M/U CLEAN-OUT BHA#2. -8.5"OD TRI CONE BIT -2 X 7"OD BOOT BASKETS -BIT SUB-6-3/8"OD -6-1/4"BOWEN BUMPER SUB -6-1/4"X-O SUB -(6)6-1/4"DC'S-6-1/4"OD 04:00 - 06:00 2.00 CLEAN P DECOMP RUN IN HOLE WITH 8-1/2"CLEAN-OUT BHA#2. -PJSM FOR RIH,P/U DP FROM PIPE SHED, WITH RIG CREWAND BAKER REP. -RIH WITH CLEAN-OUT BHA,P/U 4"DP SINGLES FROM PIPE SHED F/SURFACE'T/ 2,583'. *NO INDICATION OF TIGHT SPOT AT 58'. -MONITOR TRIP ON THE TRIP TANK- OBSERVED CORRECT DISPLACEMENT. *PHASE 2 WEATHER- JOURNEY MANAGEMENT FOR WSL AND TP CHANGE OUT- DISCUSSED PLAN- WSL&TP APPROVED. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 8 of 29 Operation Summary Report ------ __-..-_.------------ Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site'PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 CLEAN N WAIT DECOMP OPERATIONS SUSPENDED DUE TO PHASE 3 WEATHER CONDITIONS. -PHASE 2 WEATHER FIELD WIDE;PHASE 3 WEATHER ON Y PAD WITH LEVEL 3 ROAD CONDITIONS AND PAD AND ACCESS ROADS. -HEAVY EQUIPMENT IN ROUTE TO ASSIST WITH RIG TEAM CHANGE OUT. -CONTINUOUSLY MONITOR WELL,WHILE CIRC ACROSS TOP OF STACK. *WELL STABLE. -CONDUCT TABLE TOP DRILLS: **KICK WHILE DRILLING DRILL,STRIPPING DRILL,CAMP EVAC DRILL,FIRE DRILL IN DOG HOUSE.** *FLUID LOSS LAST 12 HRS=0 BBLS *OA PRESSURE=0 PSI 12:00 - 14:00 2.00 CLEAN N WAIT DECOMP OPERATIONS SUSPENDED DUE TO PHASE 3 WEATHER CONDITIONS. -CONTINUOUSLY MONITOR WELL,WHILE CIRC ACROSS TOP OF STACK. *WELL STABLE. HEAVY EQUIPMENT,CLEARING Y-PAD ACCESS ROAD IN PREPARATION FOR RIG CREW CHANGE. -PJSM WITH RIG TEAM AND HEAVY EQUIPMENT OPERATORS FOR RIG CREW CHANGE IN PHASE 2 WEATHER CONDITIONS WITH ROTARY SUPERINTENDENT APPROVAL. -SUCCESSFUL RIG TEAM CHANGE OUT WITH HEAVY EQUIPMENT ESCORT. 14:00 - 16:00 2.00 CLEAN P DECOMP PULL OUT OF HOLE WITH CLEAN-OUT BHA #2. -PJSM WITH RIG CREW AND BAKER REPS. -10 MIN FLOW CHECK. WELL STABLE. -ESTABLISH PARAMETERS. *PUW=95K, SOW=95K -POOH WITH CLEAN-OUT BHA,STANDING BACK 4"DP IN DERRICK F/2,583'T/214'. -10 MIN FLOW CHECK FOR NON-SHEARABLES ACROSS BOP STACK WELL STABLE. -POOH AND UD CLEAN-OUT BHA F/214'. 16:00 - 17:30 1.50 CLEAN P DECOMP RUN IN HOLE WITH 8-1/2"CLEAN-OUT BHA#3. -PJSM WITH RIG CREW AND BAKER REP. -P/U AND M/U CLEAN-OUT BHA. -8.5"OD TRI CONE BIT -8-3/8"WATERMELON MILL -6-3/8"DBL PIN SUB -2 X 7"OD BOOT BASKETS -BIT SUB-6-3/8"OD -6-1/4"BOWEN BUMPER SUB -6-1/4"OIL JARS -6-1/4"X-O SUB -(6)6-1/4"DC'S-6-1/4"OD -6-1/4"X-0 SUB -RIH WITH CLEAN OUT BHA TO 46'. -WORK THROUGH TIGHT SPOT F/46'T/58' WITH 8-3/8"WATERMELON MILL SEVERAL TIMES. *2-4K TO WORK THROUGH TIGHT SPOT. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 9 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:00 0.50 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"CLEAN-OUT BHA#3 AND MAKE UP 8-1/4"SWAGE BHA#4. -POOH AND UD CLEAN-OUT BHA#3. P/U AND M/U 8-1/4"SWAGE BHA#4. -6-3/8"BULL NOSE -8-1/4"SWAGE 6-1/4"BOWEN BUMPER SUB 6-1/4"OIL JARS -6-1/4"X-O SUB -(6)6-1/4"DC'S-6-1/4"OD -6-1/4"X-0 SUB 18:00 - 19:00 1.00 CLEAN P DECOMP RIH WITH 8-1/4"SWAGE BHA#4. -RIH WITH SWAGE BHA TO 150'. 'NO INDICATION OF TIGHT SPOT AT 58'. POOH WITH SWAGE BHA F/150'TI SURFACE. • 19:00 - 22:30 3.50 CLEAN N WAIT DECOMP OPERATIONS SUSPENDED DUE TOY PAD ACCESS ROAD BECOMING IMPASSABLE. -CONTINUOUSLY MONITOR WELL,WHILE CIRC ACROSS TOP OF STACK. 'WELL STABLE. -HEAVY EQUIPMENT,CLEARING Y-PAD ACCESS ROAD. 22:30 - 00:00 1.50 CLEAN P DECOMP LAY DOWN 8-1/4"SWAGE BHA#4 AND MAKE UP 9-5/8"CLEAN-OUT BHA#5. -PJSM WITH RIG CREW AND BAKER REP. DISCUSS NON SHEARABLES ACROSS THE STACK.UNDERSTAND BHA LENGTH -L/D SWAGE BHA#4.AS DIRECTED BY BAKER REP -P/U AND M/U CLEAN-OUT BHA#5. -8.5"OD TRI CONE BIT -8-3/8"WATERMELON MILL 6-3/8"DBL PIN SUB '-2 X 7"OD BOOT BASKETS -BIT SUB-6-3/8"OD 6-1/4"BOWEN BUMPER SUB -6-1/4"OIL JARS -6-1/4"X-O SUB -(6)6-1/4"DC'S-6-1/4"OD -6-1/4"X-O SUB -RIH WITH 9-5/8"CLEAN-OUT BHA TO 227'. •STILL IMPLIMENTING JOURNEY MANAGEMENT PLAN FOR TRAVEL OFF LOCATION DUE TO SEVERE DRIFTING *FLUID LOSS LAST 12 HRS=0 BBLS OA PRESSURE=0 PSI 11/21/2014 00:00 - 03:30 3.50 CLEAN P DECOMP RUN IN HOLE WITH 8-1/2"CLEAN-OUT BHA#5. -RIH WITH 8-1/2"CLEAN-OUT BHA F/227'TO 2,584'ON 4"DP STANDS FROM THE DERRICK -RIH WITH CLEAN-OUT BHA F/2,584',ON 4" DP SINGLES FROM PIPE SHED AND TAG TOP OF 4-1/2"STUB ON DEPTH AT 6,545'. -ESTABLISH PARAMETERS AND OBTAIN SPRs. 'PUW=155K,SOW=145K *TRIP MONITORED ON THE TRIP TANK WITH CONTINUOUS HOLE FILL-CORRECT DISPLACEMENT OBSERVED. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 10 of 29 Operation Summary Report Common Well Name.Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 04:30 1.00 CLEAN P DECOMP CIRCULATE HIGH VIS SWEEP AROUND. -LINE UP AND PUMP 30 BBL HIGH VIS SWEEP AT 6,500'. CIRC SWEEP OUT WITH 8.5 PPG SEAWATER AT 640 GPM WITH 2,200 PSI,ROTATING 20 RPM WITH 3K FREE TORQUE AND RECIPROCATE STRING 90'. *OBSERVED DEBRIS AND SCALE AT SHAKERS. CIRCULATE TOTAL 518 BBLS AND SHAKERS CLEANED UP. -10 MIN FLOW CHECK. WELL STABLE. -BLOW DOWN TOP DRIVE. -INSTALL STRIPPING RUBBER AND AIR SLIPS. 04:30 - 06:30 2.00 CLEAN P DECOMP PULL OUT OF HOLE WITH 8-1/2"CLEAN-OUT BHA#5. -PJSM FOR PULLING OUT.DISCUSS PROPER HOLE FILL AND ACCURATE FLUIDS MANAGEMENT-TRIP SHEETS -POOH WITH CLEAN-OUT BHA,STANDING BACK 4"DP F/6,500'T/300'. *MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. 06:30 - 07:30 1.00 CLEAN P DECOMP LAY DOWN 8-1/2"CLEAN-OUT BHA#5. -PJSM FOR L/D BHA WITH RIG CREWAND BAKER REP.-EMPHASIS ON WELL CONTROL WITH NON-SHEARABLES ACROSS BOP STACK. -10 MIN FLOW CHECK FOR NON-SHEARABLES ACROSS BOP STACK WELL STABLE. -POOH AND UD CLEAN-OUT BHA F/300'. 07:30 - 08:30 1.00 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR. -CLEAN AND CLEAR RIG FLOOR OF CLEAN-OUT BHA. -PREPARE RIG FLOOR FOR E-LINE OPERATIONS. *SIMOPS: -PJSM ON R/U E-LINE UNIT AND EQUIPMENT WITH RIG AND SLB E-LINE CREW. -POSITION SLB E-LINE UNIT AND EQUIPMENT. 08:30 - 12:00 3.50 EVAL P DECOMP RIG UP SCHLUMBERGER E-LINE UNIT AND EQUIPMENT. -PJSM ON E-LINE OPERATIONS AND REVIEW DDI SOP WITH RIG AND SLB E-LINE CREW. -R/U SLB E-LINE EQUIPMENT. **TABLE TOP WELL CONTROL DRILL WITH E-LINE IN THE HOLE.** *FLUID LOSS LAST 12 HRS=0 BBLS *OA PRESSURE=0 PSI Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 11 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 17:00 5.00 EVAL P DECOMP RUN IN HOLE WITH SLB USIT LOG TOOL STRING. -P/U,M/U AND SURFACE TEST SLB USIT LOG TOOL STRING. -RIH WITH USIT LOG TOOL STRING T/ -LOG UP F/6,480'T/SURFACE. -REVIEW USIT LOG WITH ODE AND DETERMINE TOC AT 2,100'. *CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. 17:00 - 22:00 5.00 EVAL P DECOMP RUN IN HOLE WITH SLB USIT LOG TOOL STRING. -RIH WITH USIT LOG TOOL STRING T/6,480'. -LOG UP F/6,480'T/5,750'AND F/5,300'T/ 4,600'. -POOH WITH E-LINE F/4,600'T/SURFACE. CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. 22:00 - 23:00 1.00 DHB P DECOMP RUN IN HOLE WITH HES 9-5/8"EZSV-B ON SLB E-LINE. -PJSM ON E-LINE OPERATIONS UTILIZING CHARGES,DISCUSSING ISOLATING POWER TO TOP DRIVE,EXCLUSION ZONES,AND COMMUNICATION WHEN ARMING CHARGES VIA GAI TRONICS/HARMONY WITH HES REP, RIG AND SLB E-LINE CREW. -ISOLATE POWER TO TOP DRIVE. -M/U 9-5/8"EZSV-B WITH E-LINE SETTING KIT. -SURFACE TEST E-LINE. CONNECTIVITY ISSUES WITH WEIGHT INDICATOR POWER SUPPLY. *CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. *SIMOPS: -REVIEW USIT LOG DATA WITH ODE AND GEO. -DETERMINE SETTING DEPTH OF 9-5/8" EZSV-B AT 6,042'MD AND CUT DEPTH OF 9-5/8"CSG AT 2,000'MD. 23:00 - 00:00 1.00 DHB N SFAL DECOMP TROUBLESHOOT E-LINE CONNECTIVITY ISSUES. -TROUBLESHOOT ISSUES WITH WEIGHT INDICATOR POWER SUPPLY IN E-LINE UNIT. *CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. FLUID LOSS LAST 12 HRS=0 BBLS OA PRESSURE=0 PSI 11/22/2014 00:00 - 00:30 0.50 DHB N SFAL DECOMP TROUBLESHOOT E-LINE CONNECTIVITY ISSUES. -TROUBLESHOOT ISSUES WITH WEIGHT INDICATOR POWER SUPPLY IN E-LINE UNIT. -SURFACE TEST E-LINE TOOL STRING. TEST PASS. CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 12 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 03:30 3.00 DHB P DECOMP RUN AND SET 9-5/8"EZSV-B ON E-LINE. -PJSM ON E-LINE OPERATIONS UTILIZING CHARGES,DISCUSSING ISOLATING POWER TO TOP DRIVE,EXCLUSION ZONES,AND COMMUNICATION WHEN ARMING CHARGES VIA GAI TRONICS/HARMONY WITH HES REP, RIG AND SLB E-LINE CREW. -CLEAR AFFECT AREA AND ARM SETTING TOOL. -RIH WITH 9-5/8"EZSV-B ON E-LINE T/6,160' ELM. I-LOG AND CORRELATE 9-5/8"EZSV-B ON DEPTH. -SET 9-5/8"EZSV-B WITH TOP AT 6,042'MD. -VERIFY 9-5/8"EZSV-B SET BY TAGGING WITH SETTING TOOL AT 6,042'MD. CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. 'SIMOPS: -RIG CREW WORKING ON DDI MP2's. 03:30 - 05:00 1.50 DHB P DECOMP PULL OUT OF HOLE WITH 9-5/8"EZSV-B SETTING TOOL ON E-LINE. POOH WITH E-LINE F/6,042'T/200'. -PJSM AND CLEAR AFFECTED AREA FOR E-LINE CHARGES. -POOH WITH E-LINE F/200'. -VERIFY CHARGES SPENT. CONFIRMED. -R/D SLB E-LINE UNIT AND EQUIPMENT. CONTINUOUSLY MONITOR WELL ON TRIP TANK. WELL STABLE. 05:00 - 08:30 3.50 DHB P DECOMP RIG UP TO PERFORM MIT ON 9-5/8"CSG AND 9-5/8"EZSV-B AT 6,042'MD. -PJSM ON TESTING 9-5/8"CSG,WITH PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. -RIG UP TEST EQUIPMENT AND LINES. -CLOSE BLIND/SHEAR RAMS. -PRESSURE TEST 9-5/8"CSG AND 9-5/8" EZSV-B TO 250 PSI FOR 5 CHARTED MINS. -INCREASE PRESSURE F/250 PSI T/3,600 PSI FOR 30 CHARTED MINS. 'PRESSURED UP AT 0.5 BPM *TOOK 6.4 BBLS TO PRESSURE UP TO 3,600 PSI. *20 PSI PRESSURE LOSS 15 MINUTES.10 PSI PRESSURE LOSS SECOND 15 MINUTES. -BLEED OFF ALL PRESSURE. *6.4 BBLS BLED BACK. ,'PASSING RESULTS PER WELLBORE INTEGRITY TESTING CRITERIA. *VERIFIED COMPETENCY OF MIT WITH WTL AND WAS GRANTED PERMISSION TO PROCEED WITH OPERATIONS. -VERIFY NO PRESSURE. -OPEN BLIND/SHEAR RAMS. -RIG DOWN TEST EQUIPMENT. -BLOW DOWN CHOKE/KILL AND BLEEDER LINES. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 13 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 10:00 1.50 CASING P DECOMP MOBE 8-1/4"MULTI-STRING CUTTER BHA TO RIG FLOOR. -PJSM DISCUSSING BEAVER SLIDE OPERATIONS INCLUDING EXCLUSION ZONES WITH RIG CREWAND BAKER REP. P/U 8-1/4"MULTI-STRING CUTTER BHA. *DISCUSS WITH ODE CLOSE TOLERANCE OF WHIPSTOCK SETTING DEPTH TO 9 5/8" CASING COLLAR. CHANGE OPERATIONS PLAN TO ELIMINATE FILL ON TOP OF EZSV. -L/D 8-1/4"MULTI-STRING CUTTER BHA. 10:00 - 12:00 2.00 CASING C DECOMP RUN IN HOLE WITH 4"MULE SHOE BHA#6. P/U,M/U AND RIH WITH 4"MULE SHOE TO 4,847'. **SPILL DRILL.** *FLUID LOSS LAST 12 HRS=0 BBLS *OA PRESSURE=0 PSI 12:00 - 12:30 0.50 CASING C DECOMP RIG SERVICE -SERVICE AND INSPECT TOP DRIVE, BLOCKS,DRAW WORKS AND ST-80. 12:30 - 13:30 1.00 CASING C DECOMP RUN IN HOLE WITH 4"MULE SHOE#6. -RIH WITH 4"MULE SHOE F/4,847'T/ 6,000'.AND TAG TOP OF 9-5/8"EZSV-B AT 6,048'. -ESTABLISH PARAMETERS. *PUW=135K, SOW=130K -RIH WITH 4"MULE SHOE F/6,000'AND TAG TOP OF 9-5/8"EZSV-B AT 6,048'WITH 10K DOWN. 13:30 - 15:30 2.00 CASING C DECOMP PLACE 10'OF 20/40 RIVER SAND ON TOP OF 9-5/8"EZSV-B. -PJSM. -PULL UP HOLE F/6,048'T/6,018' -R/U SAND HOPPER ON 4"DP WITH SEAWATER ATTACHED TO INLET. -PLACE 10'OF 20/40 RIVER SAND ON TOP OF 9-5/8"EZSV-B SET AT 6,048',THRU 4"DP. *TOP OF SAND AT±6,038'. -PUMP 1-DP VOLUME AT 2 BPM WITH 40 PSI, TO ENSURE 4"DP CLEAN AND CLEAR OF SAND. 15:30 - 18:30 3.00 CASING C DECOMP PULL OUT OF HOLE WITH 4"MULE SHOE BHA #6. -PJSM. -10 MIN FLOW CHECK. WELL STABLE. -ESTABLISH PARAMETERS. *PUW=135K, SOW=130K -POOH WITH 4"MULE SHOE F/6,018'T/ SURFACE. L/D 4"MULE SHOE BHA. 18:30 - 20:00 1.50 CUT P DECOMP RUN IN HOLE WITH 8-1/4"MULTI-STRING CUTTER BHA#7. -PJSM WITH RIG CREWAND BAKER REP. -P/U,M/U AND RIH WITH 8-1/4"MULTI-STRING CUTTER BHA T/2,005'. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 14 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 22:00 2.00 CUT P DECOMP CUT 9-5/8"47#L-80 BTC CASING AT 2,005. -PJSM WITH RIG CREW AND BAKER REP. -ESTABLISH PARAMETERS AND OBTAIN SPRs. *PUW=80K, SOW=80K, RTW=80K, RPM=80 WITH 2-3K FREE TORQUE -LOCATE COLLARS WITH KNIVES AT 1,996' AND 2,036'. -SET KNIVES AT 2,005'. -STARTED PUMPS AT 3 BPM WITH 150 PSI,4 BPM WITH 300 PSI,5 BPM WITH 625 PSI,6 BPM WITH 750 PSI,7 BPM WITH 830 PSI, RPM=80 WITH 2-3K TORQUE -AFTER 3.5 MINUTES OF CUTTING, OBSERVED TORQUE DROP OFF TO 0-1K AND PUMP PRESSURE DROPPED FROM 830 PSI TO 330 PSI,INDICATING 9-5/8"CSG CUT. -CONTINUE CUTTING AT 7 BPM WITH 330 PSI FOR 15 MINS,AS PER WELL PROGRAM TO • ENSURE GOOD CUT. 22:00 - 23:30 1.50 CUT P DECOMP DISPLACE DEAD CRUDE FREEZE PROTECT FROM 13-3/8"x 9-5/8"ANNULUS. -PJSM WITH RIG CREW,BAKER AND MI REP. •-CLOSE ANNULAR PREVENTER. PUMP 40 BBL DEEP CLEAN PILL DOWN, FOLLOWED BY 8.5 PPG SEAWATER,DOWN 4" • DP TAKING RETURN THRU OA TO THE FLOWBACK TANK AT 2 BPM WITH 80 PSI. -AT 150 BBLS DISPLACED,INCREASE PUMP RATE F/2 BPM T/5 BPM WITH 320 PSI. *PUMP TOTAL OF 203 BBLS AND RETURN CLEANED UP. 23:30 - 00:00 0.50 CUT P DECOMP FLOW CHECK. -10 MIN FLOW CHECK. WELL STABLE. -VERIFY NO PRESSURE. -OPEN ANNULAR PREVENTER. -BLOW DOWN CHOKE LINE. FLUID LOSS LAST 12 HRS=0 BBLS OA PRESSURE=0 PSI 11/23/2014 00:00 - 00:30 0.50 CUT P DECOMP RIG SERVICE -SERVICE AND INSPECT TOP DRIVE, BLOCKS,DRAW WORKS AND ST-80. 00:30 - 02:00 1.50 CUT P DECOMP PULL OUT OF HOLE WITH 8-1/4" MULTI-STRING CUTTER BHA#7. -PJSM WITH RIG CREW AND BAKER REP. -POOH WITH 8-1/4"MULTI-STRING CUTTER BHA F/2,005'T/SURFACE. -INSPECT AND UD 8-1/4"MULTI-STRING CUTTER BHA. *OBSERVED WEAR ON KNIVES,INDICATING GOOD CUT. 02:00 - 02:30 0.50 WHSUR P DECOMP RETRIEVE WEAR BUSHING. • -R/U AND RETRIEVE WEAR BUSHING. -L/D WEAR BUSHING AND RETRIEVAL TOOL. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 15 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:OOAM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual©83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 04:30 2.00 CASING P DECOMP SPEAR AND PULL 9-5/8"CASING FREE. -PJSM WITH RIG CREW,BAKER AND CAMERON REPS. -P/U AND M/U SPEAR BHA#8. -6-3/8"BULLNOSE -8-3/8"SPEAR PACK-OFF ASSY -8-1/4"ITCO SPEAR W/8.681 GRAPPLE -6-3/8"SPEAR EXTENSION -10-3/4"STOP SUB -CROSSOVER SUB -ENGAGE 9-5/8"CSG WITH SPEAR BHA, BELOW CSG HANGER AS PER BAKER REP. *ENGAGE WITH 5K DOWN,PULL 15K OVER, SET DOWN 5K,PULL 25K OVER,SLACK OFF TO NEUTRAL WT. -CAMERON REP,BACK OUT LOWER LDS. -WORK AND PULL 9-5/8"CSG HANGER FREE, AS PER BAKER REP.(DRY STRING WEIGHT=94K,BUOYANCY WT=82K) *9-5/8"CSG HANGER FREE WITH 35K OVER PULL. 04:30 - 06:30 2.00 CASING P DECOMP CIRCULATE TO CLEAN AND CLEAR WELLBORE OF RESIDUAL DEAD CRUDE FREEZE PROTECT. -CIRC 8.5 PPG SEAWATER AT 9 BPM WITH 70 PSI,WHILE RECIPROCATING CSG 60',UNTIL RETURNS CLEANED UP. -10 MIN FLOW CHECK. WELL STABLE. *SIMOPS: -PJSM ON BEEVER SLIDE OPS WITH RIG CREWAND DOYON CASING REP. -MOBE POWER TONGS AND 9-5/8" HANDLING EQUIPMENT TO RIG FLOOR. 06:30 - 08:30 2.00 CASING P DECOMP LAY DOWN 8-1/4"ITCO SPEAR BHA#8 AND RIG UP TO PULL/LAY DOWN 9-5/8"CASING. -PJSM ON BEEVER SLIDE OPS AND PULLING /L/D 9-5/8"CSG WITH RIG CREW,BAKER AND DOYON CSG REPS. -L/D 8-1/4"ITCO SPEAR BHA. -BLOW DOWN TOP DRIVE. -M/U X-OVERS AND PREPARE WELL CONTROL EQUIPMENT FOR PULLING 9-5/8" CSG. -R/U POWER TONGS AND 9-5/8"HANDLING EQUIPMENT. -CLEAN AND CLEAR RIG FLOOR OF SPEAR BHA. 08:30 - 12:00 3.50 CASING P DECOMP PULL OUT OF HOLE,LAYING DOWN 9-5/8"47# L-80 NSCC CASING. -L/D 9-5/8"CSG HANGER. -POOH,L/D 9-5/8"CSG F/CUT AT 2,005'TI 1,179'. *AVERAGE BREAK-OUT TORQUE=20-25K FT/LBS **KICK WHILE TRIPPING DRILL,ELEVATED TO COMPLEX DRILL WITH ANNULAR FAILURE. -FOLLOWED BYAAR.** *FLUID LOSS LAST 12 HRS=0 BBLS *OA PRESSURE=0 PSI Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 16 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 CASING P DECOMP RIG SERVICE -SERVICE AND INSPECT TOP DRIVE, BLOCKS,DRAW WORKS AND ST-80. 12:30 - 15:00 2.50 CASING P DECOMP PULL OUT OF HOLE,LAYING DOWN 9-5/8"47# L-80 NSCC CASING. PJSM WITH RIG CREW AND DOYON CSG REP. -L/D 9-5/8"CSG HANGER. -POOH,L/D 9-5/8"CSG F/1,179'T/SURFACE. *RECOVERED:50-JTS OF 9-5/8"CSG, 1-CUT JT OF 9-5/8"CSG(9.53'LONG), 16- TURBOLATORS *OBSERVED ECCENTRIC AREA ON FIRST JT OF 9-5/8"CSG BELOW HANGER. 15:00 - 15:30 0.50 CASING P DECOMP CLEAN RIG FLOOR. -CLEAN AND CLEAR RIG FLOOR OF POWER TONGS AND 9-5/8"HANDLING EQUIPMENT. 15:30 - 18:30 3.00 CASING P DECOMP MAKEUP 12-1/4"DRESS-OFF/13-3/8" SCRAPER BHA#9. -PJSM WITH RIG CREW AND BAKER REP. P/U,M/U AND RIH WITH 12-1/4"DRESS-OFF BHA AND TAG AT 43'WITH 10K DOWN. -ATTEMPT TO WORK PAST 43'SEVERAL TIMES,WITH NO SUCCESS. `DISCUSS PLAN FORWARD WITH ODE. ASSEMBLY COMPONENTS FOR CONTINGENCY BHA CONFIGURATIONS. 18:30 - 21:30 3.00 CASING N DPRB 42.38 DECOMP MODIFY 12-1/4"DRESS-OFF BHA#9 IN ATTEMPT TO GET PAST TIGHT SPOT. -PJSM WITH RIG CREWAND BAKER REP. -REMOVE 13-3/8"CSG SCRAPER FROM BHA. -RIH AND ATTEMPT TO WORK PAST TIGHT SPOT AT 43',SEVERAL TIMES WITH NO SUCCESS. POOH. REMOVE 12-1/4"DRESS-OFF SHOE AND M/U 13-3/8"CSG SCRAPER. -RIH AND ATTEMPT TO WORK 13-3/8"CSG SCRAPER PAST TIGHT SPOT AT 43'SEVERAL TIMES WITH NO SUCCESS. POOH. -UD 13-3/8"SCRAPER BHA. 21:30 - 00:00 2.50 CASING N DPRB 42.38 DECOMP RUN 12-1/4"WATERMELON MILL BHA#10. -PJSM FOR MILLING OPERATIONS:DISCUSS THE HAZARDS INVOLVED WITH PICKING UP BHA,ENSURE RIG HAND IS AT THE CELLAR AT ALL TIMES MONITORING FOR RETURNS UP THE CONDUCTOR TO THE CELLAR. -P/U,M/U AND RIH WITH 12-1/4" WATERMELON MILL BHA AND TAG AT 43' WITH 7K DOWN. -WASH,REAM AND WORK PAST TIGHT SPOT F/43'T/46.5'. *PUW=60K, SOW=60K,RTW=60K, PUMP RATE=5 BPM WITH 40 PSI, RPM=70 WITH 3-5K TORQUE(FREE TORQUE=1K), WOB= 3-5K *FLUID LOSS LAST 12 HRS=0 BBLS 'OA PRESSURE=0 PSI Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 17 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual©83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/24/2014 00:00 - 01:00 1.00 CASING N DPRB 42.38 DECOMP ATTEMPT TO WORK 12-1/4"WATERMELON MILL BHA#10 PAST OBSTRUCTION IN THE 13-3/8"CASING WASH,REAM AND WORK PAST TIGHT SPOT F/46.5'T/47'. *PUW=60K, SOW=60K,RTW=60K, PUMP RATE=5 BPM WITH 40 PSI, RPM=70 WITH 3-5K TORQUE(FREE TORQUE=1K), WOM= 3-5K -POOH AND INSPECT 12-1/4"WATERMELON MILL BHA. 'OBSERVED 4"OF SLIGHT WEAR ON LEADING EDGE OF WATERMELON MILL. 'DURING REAMING OPERATIONS, COMMUNICATION WITH 13-3/8"SURFACE CSG AND CONDUCTOR CSG OBSERVED IN CELLAR,MAINTAIN 100%RETURNS WITH 30%RETURNS BEING CIRCULATED TO THE LINED CELLAR BOX. 01:00 - 04:00 3.00 CASING N DPRB 42.38 DECOMP ATTEMPT TO WORK 12-1/4"WATERMELON MILL BHA#10 PAST OBSTRUCTION IN THE 13-3/8"CASING -WASH,REAM AND WORK OBSTRUCTION IN THE 13-3/8" F/47'T/48'.TOTAL OF 5'OF PROGRESS MADE FROM FIRST POINT OF THE OBSTRUCTION. *PUW=60K, SOW=60K,RTW=60K, PUMP RATE=3 BPM WITH 20 PSI, RPM=70 WITH 3-5K TORQUE(FREE TORQUE=1K), WOM= 3-5K `REDUCED PUMP RATE F/5 BPM T/3 BPM,TO KEEP UP WITH RETURNS IN CELLAR. 'DURING REAMING OPERATIONS, COMMUNICATION WITH SURFACE CSG AND CONDUCTOR CSG OBSERVED IN LINED CELLAR,WITH 100%RETURNS OF SEAWATER BEING CIRCULATED. - SHUT DOWN MILLING OPERATIONS TO EVALUATE OPERATION: CONTACT ODE 04:00 - 07:00 3.00 CASING N DPRB 42.38 DECOMP LAY DOWN 12-1/4"WATERMELON MILL BHA #10. I POOH AND INSPECT 12-1/4"WATERMELON MILL BHA. *OBSERVED MINIMAL CHANGE OF WEAR ON LEADING EDGE OF WATERMELON MILL, FROM PREVIOUS INSPECTION. *DISCUSS PLAN FORWARD WITH ODE&WTL ASSEMBLE TOOL COMPONENTS FOR CONTINGENCY BHA CONFIGURATIONS. `SIMOPS: -ESTABLISH PLAN FOR TAKING RETURNS AT THE CELLAR AND REINTRODUCING THEM BACK TO THE RIG. RIG CREW WORKING ON DDI MP2s AND CLEANING RIG FLOOR,WHILE WAITING ON EQUIPMENT FOR BHA CONTINGENCIES. 'CONTINUOUSLY MONITOR WELL VISUALLY AT CELLAR. WELL STABLE. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 18 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 11:00 4.00 CASING N DPRB 42.38 DECOMP WORK 11-1/2"CASING SWAGE BHA PAST OBSTRUCTION IN 13-3/8"CASING. -P/U,M/U AND RIH WITH 11-1/2"CSG SWAGE. -ESTABLISH PARAMETERS. *PUW=55K, SOW=55K -RIH WITH 11-1/2"CSG SWAGE BHA AND TAG AT 46'WITH 5K DOWN. -WORK 11-1/2"CSG SWAGE F/46'T/55', WITH 5-7K DOWN. -PULL UP HOLE F/55'T/46'. *5-6K OVER PULL. -WORK 11-1/2"SWAGE F/46'T/55'SEVERAL TIMES. -RIH WITH 11-1/2"SWAGE F/55'T/546'. 'NO INDICATIONS OF ANY FURTHER OBSTRUCTIONS. 11:00 - 12:00 1.00 CASING N DPRB 42.38 DECOMP LAY DOWN 11-1/2"CASING SWAGE BHA. 10 MIN FLOW CHECK. WELL STABLE. -POOH WITH 11-1/2"CSG SWAGE F/546'T/ SURFACE. L/D 11-1/2"CSG SWAGE BHA. 12:00 - 12:30 0.50 CASING P DECOMP RIG SERVICE -SERVICE AND INSPECT TOP DRIVE, BLOCKS,DRAW WORKS AND ST-80. FLUID LOSS LAST 12 HRS=0 BBLS OA PRESSURE=0 PSI 12:30 - 14:30 2.00 CASING P DECOMP RUN DRESS-OFF MILL BHA#12. -PJSM WITH RIG CREW AND BAKER REP. *COVERED FLUIDS MANAGEMENT AND CIRCULATION TO THE LINED CELLAR BOX. -P/U,M/U AND RIH WITH DRESS-OFF BHA AND TAG TOP OF 9-5/8"CSG STUB AT 1,996'. 14:30 - 16:00 1.50 CASING P DECOMP DRESS-OFF 9-5/8"CASING STUB AT 2,005'. -ESTABLISH PARAMETERS AND OBTAIN SPRs. *PUW=90K, SOW=95K, RTW=95K, RPM=50 WITH 1-2K FREE TORQUE, PUMP RATE=6 BPM WITH 120 PSI -RIH WITH DRESS-OFF MILL BHA F/1,996' AND TAG TOP OF 9-5/8"CSG STUB AT 2,005'. -DRESS-OFF 9-5/8"CSG STUB F/2,005'T/ 2,006'. 'RPM=50 WITH 2-4K TORQUE, PUMP RATE= 6 BPM WITH 120 PSI, WOM=3-5K 16:00 - 17:00 1.00 CASING P DECOMP CIRCULATE. -PUMP 40 BBL DEEP CLEAN PILL AND CIRC SAME OUT AT 6 BPM WITH 120 PSI. -10 MIN FLOW CHECK. WELL STABLE. 17:00 - 18:30 1.50 CASING P DECOMP PULL OUT OF HOLE WITH DRESS-OFF MILL BHA#12. -POOH WITH DRESS-OFF BHA F/2,006'T/ 250'. 18:30 - 20:00 1.50 CASING P DECOMP LAY DOWN DRESS-OFF MILL BHA#12. -10 MIN FLOW CHECK FOR NON-SHEARABLES ACROSS BOP STACK WELL STABLE. -POOH AND L/D DRESS-OFF MILL BHA. -CLEAN AND CLEAR RIG FLOOR OF DRESS-OFF MILL BHA. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 19 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor.DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ; NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 00:00 4.00 TIEBAC P OTHCMP 'RIG UP TO RUN 9-5/8"47#L-80 VAMTOP CASING PATCH. -PJSM WITH RIG CREW,DOYON CASING, HES AND BAKER REPS. -MOBE POWER TONGS AND 9-5/8"RUNNING/ HANDLING EQUIPMENT AND BOW SPRING CENTRALIZERS TO RIG FLOOR. -R/U POWER TONGS,TORQUE-TURN AND 9-5/8"HANDLING EQUIPMENT. -M/U X-OVERS TO FOSV AND R/U SAFETY JT, FOR WELL CONTROL. 1*FLUID LOSS LAST 12 HRS=0 BBLS *OA PRESSURE=0 PSI • 11/25/2014 00:00 - 00:30 0.50 TIEBAC P { OTHCMP RIG SERVICE -SERVICE AND INSPECT TOP DRIVE, BLOCKS,DRAW WORKS AND ST-80. 00:30 - 05:00 4.50 TIEBAC P OTHCMP RUN 9-5/8"47#L-80 VAMTOP CASING PATCH. -PJSM WITH RIG CREW,HES,DOYON CASING AND BAKER REPS. P/U,M/U AND RIH WITH 9-5/8"BOWEN CSG PATCH,9-5/8"47#L-80 CSG PUP JT AND 9-5/8" HES ES-CEMENTER ASSY TO 68'. -P/U,M/U AND RIH WITH 9-5/8"CSG PATCH ASSY F/68'T/1,558'. *SHOE TRACK ASSEMBLY AND FIRST JT OF 9-5/8"CSG BAKER LOCKED. l*TORQUE-TURN ALL VAMTOP CONNECTIONS I TO 15,900 FT/LBS. *1-FREE FLOATING,9-5/8"x 11-3/4"STRAIGHT •VAIN,BOW SPRING CENTRALIZER INSTALLED ON EACH JT. 05:00 - 05:30 0.50 TIEBAC P OTHCMP MOB CEMENT HEAD AND HANDLING • EQUIPMENT TO RIG FLOOR. 05:30 - 08:30 1.00 TIEBAC N RREP 1,557.38 OTHCMP CODE 8 TROUBLESHOOT ELECTRICAL CONTROL UNIT ON PIPE SKATE. -SECURE WELL WITH FOSV. -TROUBLESHOOT ELECTRICAL CONTROL UNIT ON PIPE SKATE. -RIG ELECTRICIAN,REPAIR ELECTRICAL CONTROL UNIT ISSUE. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 20 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 09:30 3.00 TIEBAC P OTHCMP RUN 9-5/8"47#L-80 VAMTOP CASING PATCH. -P/U,M/U AND RIH WITH 9-5/8"CSG PATCH ASSY F/1,558'T/1,963'. -M/U 9-5/8"VAMTOP x 4"XT-39 X-OVER FOR LANDING JT. -OBTAIN PARAMETERS. *PUW=130K, SOW=135K IN 8.5 PPG SEAWATER. -RIH F/1,963'T/1,998'. -M/U TOP DRIVE. -RIH AND ENGAGE 9-5/8"BOWEN CSG PATCH OVER 9-5/8"STUB AT 2,006',AS PER BAKER REP. *NO-GO ON 9-5/8"CSG STUB WITH 30K DOWN AND PULL 100K OVER TO ENSURE CSG PATCH SET.(END OF 9-5/8"CSG PATCH AT 2,007'WITH 3'OF SWALLOW) *TORQUE-TURN ALL VAMTOP CONNECTIONS TO 15,900 FT/LBS. *1-FREE FLOATING,9-5/8"x 11-3/4"STRAIGHT VAIN,BOW SPRING CENTRALIZER INSTALLED ON JTS#1-46 *TOTAL CENTRALIZER=46 09:30 - 10:30 1.00 TIEBAC P OTHCMP RIG UP HES QUICK LATCH CEMENT HEAD. -PJSM WITH RIG CREW,BAKER AND HES REPS. -P/U AND M/U X-OVER AND HES QUICK LATCH CEMENT HEAD. *SIMOPS: -POSITION SLB CEMENT UNIT AND EQUIPMENT. 10:30 - 11:30 1.00 TIEBAC P OTHCMP TEST 9-5/8"BOWEN CASING PATCH AND SHEAR HES ES-CEMENTER OPEN. -PJSM WITH BAKER AND HES REPS. PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. !-PRESSURE TEST 9-5/8"CSG PATCH TO 250 PSI FOR 5 CHARTED MINS AND 1,000 PSI FOR 10 CHARTED MINS. TEST PASS. *2.0 BBLS TO PRESSURE UP TO 1,000 PSI. -PULL 100K OVER TO TEST CSG PATCH(230K ON WT INDICATOR) -SHEAR ES-CEMENTER OPEN:INCREASE PRESSURE F/1,000 PSI T/2,580 PSI AND OBSERVED ES-CEMENTER SHEAR OPEN. *CONFIRMED ES-CEMENTER SHEAR WITH VISUAL INDICATION IN CELLAR. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 21 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 13:00 1.50 TIEBAC P OTHCMP PRESSURE TEST SLB CEMENT EQUIPMENT AND LINES. -PJSM WITH HES,SLB AND BAKER REPS. PRESSURE CROSSCHECK DISCUSSION AND CONFIRMED CHALLENGE QUESTIONS WITH CORRECT RESPONSES. -PUMP 5 BBLS OF FRESH WATER TO PURGE CEMENT LINES. -FUNCTION TEST OVERPRESSURE PROTECTION DEVICES. *WSL VERIFIED PUMP TRIPS FUNCTION PROPERLY ON BOTH HEADS. -PRESSURE TEST CEMENT EQUIPMENT AND LINES TO 250/4,000 PSI FOR 5 CHARTED MINS EACH. TEST PASS. -POSITION AND R/U VAC-TRUCKS FOR RETURNS IN LINED CELLAR. 13:00 - 14:30 1.50 TIEBAC P OTHCMP CIRCULATE. -CIRC 290 BBLS OF 120°8.5 PPG SEAWATER AT 5 BPM WITH 100 PSI,TO WARM WELLBORE. 14:30 - 17:00 2.50 TIEBAC P OTHCMP CEMENT 9-5/8"CASING PATCH. -LINE UP CEMENT UNIT TO WELL. -MIX AND PUMP 180 BBLS OF 15.8 PPG CLASS G CEMENT WITH GASBLOKAND ADDITIVES. *YIELD=1.17 CUFT/SK -SHUT DOWN CEMENT UNIT. -LAUNCH ES-CEMENTER CLOSER PLUG. -SLB CEMENTERS,KICK OUT CLOSER PLUG WITH 5 BBLS FRESH WATER. -SHUT DOWN CEMENT UNIT. -LINE UP RIG PUMPS TO DISPLACE CMT. -DISPLACE CMT WITH 8.5 PPG SEAWATER AT 5 BPM WITH 70 PSI. -DISPLACE CMT WITH 8.5 PPG SEAWATER AT 5 BPM WITH 580 PSI. *CMT RETURNS TO SURFACE AT 70 BBLS DISPLACED. -SLOWED PUMP TO 2 BPM WITH 700 PSI,AT 130 BBLS DISPLACED. -SLOWED PUMP TO 0.5 BPM WITH 680 PSI, AT 135 BBLS DISPLACED. -BUMPED PLUG ON SCHEDULE AT 138 BBLS TOTAL DISPLACEMENT. *FINAL DISPLACEMENT PRESSURE=680 PSI. *BUMPED PLUG AND CLOSE ES CEMENTER WITH 1,900 PSI. HELD FOR 5 MINS. -BLED OFF PRESSURE AND CHECK FLOATS. FLOATS HELD. -CEMENT IN PLACE WITH PLUG BUMPED AT 16:00 HRS ON 11/25/2014. *UCA RESULTS: 500 PSI COMPRESSIVE STRENGTH AT 20 HRS:01 MINS. -R/D SLB CMT LINES AND EQUIPMENT. Printed 12/1/2014 11:36:28AM I North America-ALASKA-BP Page 22 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 20:00 3.00 TIEBAC P OTHCMP INSTALL 9-5/8"EMERGENCY SLIPS. -PJSM WITH RIG CREW AND CAMERON REPS. -VOID BOP STACK OF FLUID. -SPLIT BOP STACK AT CASING HEAD FLANGE. -CENTER 9-5/8"CSG. -CAMERON REPS,INSTALL EMERGENCY CSG SLIP AND ENERGIZE WITH 70K. 20:00 - 23:00 3.00 TIEBAC P OTHCMP CUT AND LAY DOWN EXCESS 9-5/8"CASING. -PJSM WITH RIG CREWAND CAMERON REPS. -VOID 9-5/8"CSG OF FLUID. -CAMERON REPS,R/U WACH'S CUTTER AND CUT EXCESS 9-5/8"CSG. L/D HES SLIP LOCK CEMENT HEAD,X-OVER, 4'9-5/8"PUP JT,AND 9-5/8"CUT JT(35.09' LONG). `6.37'OF JT#47 LEFT IN WELL. 23:00 - 00:00 1.00 WHSUR P OTHCMP INSTALL NEW MCEVOY SSH TUBING HEAD. -N/D OLD TUBING HEAD AND REMOVE FROM CELLAR. 11/26/2014 00:00 - 04:30 4.50 WHSUR P OTHCMP INSTALL NEW MCEVOY SSH TUBING HEAD. CONTINUE N/D OLD TUBING HEAD AND REMOVE FROM CELLAR. N/U NEW MCEVOY SSH TUBING HEAD WITH YBT SECONDARY SEAL. -INSTALL DOUBLE ANNULUS VALVES ON NEW TUBING SPOOL. -CAMERON REP RILDS,TORQUE LDS TO 500 FT-LBS,TORQUE GLAND NUTS TO 450 FT-LBS -PUMP PLASTIC INTO VOID BETWEEN PRIMARY SEAL AND SECONDARY YBT SEAL. -PRESSURE TEST TO 3500 PSI,FAILED. -RE-TORQUE LDS AND GLAND NUTS. -RE-LOCATE PLASTIC SEALANT PUMP TO SECONDARY OUTLET ON TUBING SPOOL, ATTEMPT TO PUMP ADDITIONAL SEALANT INTO SPOOL. ABLE TO PUMP VERY SMALL AMOUNT. -ATTEMPT PRESSURE TEST,OBSERVE PRESSURE BLEED OFF AT 1500-1800 PSI DOWN 0 PSI. *CONTACT DRLG.SUPT.AND ODE AND INFORM OF FAILED TEST. 04:30 - 09:00 4.50 WHSUR N SFAL -0.62 OTHCMP N/D TUBING SPOOL -PJSM FOR N/D SPOOL. -N/D NEW TUBING SPOOL TO INSPECT PRIMARY SEAL. -BOLDS AND REMOVE PRIMARY SEAL FROM EMERGENCY SLIPS,OBSERVE DAMAGE ON PRIMARY SEAL. -INSTALL NEW PRIMARY SEAL AND N/U TUBING SPOOL. -CAMERON REP RILDS,TORQUE LDS TO 500 FT-LBS,TORQUE GLAND NUTS TO 450 FT-LBS. -INJECT NEW PLASTIC PACKING. -PRESSURE TEST VOID TO 250/3500 PSI FOR 5 MIN EACH,TEST GOOD. Printed 12/1/2014 11:36:28AM • North America-ALASKA-BP Page 23 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual©83.38usft(above Mean Sea Level) Date • From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 11:30 2.50 BOPSUR P OTHCMP N/U BOPE PJSM FOR N/U OF BOPE,DISCUSS HAZARDS CONCERNING TORQUE WRENCH AND WORKING OVERHEAD. N/U BOPE. *NO CHANGE TO RKB MEASUREMENTS. 11:30 - 13:30 2.00 BOPSUR P OTHCMP CHANGE OUT RAMS -PJSM FOR REMOVING RAMS. DISCUSS ISOLATING ENERGY SOURCES. -REMOVE 9-5/8"RAMS,INSTALL 7"RAMS. 13:30 - 15:00 1.50 BOPSUR P OTHCMP PRESSURE TEST BOPE PJSM FOR TESTING BOPE,DISCUSS HIGH PRESSURE HAZARDS,INSTALL WHIP CHECKS. -R/U TEST MANIFOLD AND HOSES. -M/U WELL CONTROL VALVES FOR TESTING. • • *TEST SLB MWD DRILL LINK EQUIPMENT FOR 1/2 HR.PRIOR TO BEGINNING ACTUAL BOPE TEST. 15:00 - 18:00 3.00 BOPSUR P OTHCMP PRESSURE TEST BOPE FILL CHOKE MANIFOLD AND MGS,6 BBLS TO FILL. -INSTALL TEST PLUG AND PERFORM BODY PRESSURE TEST,TEST PLUG LEAKING. -PULL TEST PLUG,CLEAN OFF AND RIH,RUN IN 4 EACH LDS AND TORQUE. *D1 DRILL,CRT 2 MIN 0 SEC. • 18:00 - 00:00 6.00 BOPSUR P OTHCMP PRESSURE TEST BOPE -TEST BOPE WITH 4",4-1/2",AND 7"TEST JOINTS. -PRESSURE TEST TO 250/3500 PSI FOR 5 MIN EACH,NO FAILURES. -PERFORM MPL TEST ON UPPER AND •LOWER PIPE RAMS. *TEST PLUG BEGAN LEAKING DURING TEST, RUN IN REMAINING LDS AND TORQUE. ABLE TO CONTINUE TESTING WITH NO FURTHER LEAKS. 11/27/2014 00:00 - 03:00 3.00 BOPSUR P OTHCMP CONTINUE PRESSURE TEST BOPE -TEST BOPE WITH 4",4-1/2",AND 7"TEST JOINTS. -PRESSURE TEST TO 250/3500 PSI FOR 5 MIN EACH,NO FAILURES. -PERFORM MPL TEST ON BLIND RAMS. -R/D TEST EQUIPMENT. -BOLDS AND PULL TEST PLUG. -BLOW DOWN CHOKE,KILL,AND BLEEDER LINES. 03:00 - 03:30 0.50 WHSUR P OTHCMP P/U WEAR RING AND RIH,RILDS. M/U SAFETY JOINT. • WEAR RING ID 9.25" • 03:30 - 09:00 5.50 CLEAN P OTHCMP M/U 8-1/2"CLEAN OUT BHA#13 PJSM WITH BAKER REP AND RIG CREW. -CLEAR FLOOR AND BRING BHA COMPONENTS TO RIG FLOOR. -M/U BHA PER BAKER REP. -P/U BHA#13 F/SURFACE T/893'. Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 24 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,086,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual©83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 10:30 1.50 CLEAN P OTHCMP RIH ON ELEVATORS -RIH WITH 8.5"DRILLING BHA FROM 893'MD TO 1,841'MD -RIH ON ELEVATORS PICKING UP 4"DP SINGLES FILL PIPE EVERY 1,000'MD 10:30 - 14:00 3.50 CLEAN P OTHCMP DRILL ES CEMENTER -WASH DOWN WITH NO ROTATION F/1841'T/ 1905,TAG CEMENT AT 1905' -500 GPM,870 PSI -WASH DOWN WITH NO ROTATION F/1905'T/ 1936' -630 GPM,1300 PSI -RECIPROCATE PIPE F/1936'T/1841'AND CLEAN UP WELL BORE -WASH DOWN F/1936'T/1946',TAG PLUG AT 1946' -DRILL ES CEMENTER FROM 1946'MD TO 1948'MD -500 GPM, 850 PSI ON,850 PSI OFF -70 RPM,3.5K TORQUE ON,2.0K TORQUE OFF,WOB 5-6K -PU 115K,SO 115K,ROT 115K -SEA WATER:8.5 PPG IN,8.5 PPG OUT SPR'S AT 1841'MD -MUD PUMP#1,20 SPM-20 PSI,30 SPM-70 PSI -MUD PUMP#2,20 SPM-20 PSI,30 SPM-70 PSI 14:00 - 14:30 0.50 CLEAN P OTHCMP CIRCULATE BOTTOMS UP -CBU 1X -610 GPM,1300 PSI -NO ROTATION,NO PIPE RECIPROCATION -OBSERVED ALUMINUM AT BOTTOMS UP 14:30 - 00:00 9.50 CLEAN N RREP 1,947.38 OTHCMP CODE 8 -TROUBLE SHOOT TOP DRIVE ELECTRICAL SERVICE LOOP CONNECTION -MONITOR WELL ON TRIP TANK WHILE CIRCULATING ACROSS TOP OF HOLE 11/28/2014 00:00 - 06:00 6.00 CLEAN N RREP 1,947.38 OTHCMP CODE 8 -TROUBLE SHOOT TOP DRIVE ELECTRICAL SERVICE LOOP CONNECTION -MONITOR WELL ON TRIP TANK WHILE CIRCULATING ACROSS TOP OF HOLE -REPLACE BAD PINS ON TOP DRIVE POWER SUPPLY CABLE -FUNCTION TEST TOP DRIVE,VERIFY WORKING PROPERLY TO RESUME OPS Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 25 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date. X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UW:500292183200 Active datum:Y-14C actual©83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:30 2.50 CLEAN P OTHCMP DRILL DRILL ES CEMENTER -PJSM -P/U SINGLES FROM SHED THAT WERE LAID DOWN TO REPAIR TOP DRIVE -WASH DOWN F/1936'T/1948' -500 GPM,880 PSI,80 RPM,TQ 3K PU 112K,SO 112K,ROT 112K,WOB 3K DRILL ES CEMENTER AND CEMENT STRINGERS F/1948'MDT/2010'MD -630 GPM, 1330 PSI -80 RPM,6K TORQUE ON,OK TORQUE OFF, WOB 2-3K -PU 112K,SO 112K,ROT 112K -SEA WATER:8.5 PPG IN,8.5 PPG OUT 08:30 - 09:00 0.50 CLEAN P OTHCMP CIRCULATE BOTTOMS UP -CBU 1X -630 GPM,1330 PSI NO ROTATION,NO PIPE RECIPROCATION -OBSERVED ALUMINUM AT BOTTOMS UP 09:00 - 09:30 0.50 CLEAN P OTHCMP RIH WITH 8-1/2"CLEANOUT BHA#13 -WASH DOWN F/2010'T/2031' -96 GPM, 60 PSI -NO ROTATION,OBSERVE NO WOB,HOLE APPEARED CLEAN -RIH F/2031'T/2126' • 09:30 - 10:00 0.50 , CLEAN P OTHCMP CIRCULATE HI-VIS SWEEP -CIRCULATE 30 BBL HI-VIS SWEEP SURFACE TO SURFACE -630 GPM,1330 PSI -50 RPM,1K TORQUE,WOB OK 10:00 - 10:30 0.50 CLEAN P OTHCMP POOH -PULL BACK UP THROUGH HOLE TO VERIFY CLEAN -MONITOR WELL FOR 10 MINUTES,STATIC -POOH ON ELEVATORS F/2126'MD T/1936' MD -OBSERVED NO OVERPULL OR TIGHT HOLE 10'30 - 15:30 5.00 CLEAN P OTHCMP RIH RIH WITH 8-1/2"CLEANOUT BHA#13 F/1936' T/5733' -RIH PICKING UP 4"DP SINGLES FROM PIPE SHED -RIH WITH 8-1/2"CLEANOUT BHA#13 Fl 5733' T/5922'OUT OF DERRICK 15:30 - 17:00 1.50 CLEAN P OTHCMP RIH -WASH DN F/5922'T/6024',TAG CEMENT STRINGER AT 6024' -24 GPM,15 PSI -40 RPM,3-4K TORQUE,5K WOB -PU 177K,SO 150K,ROT 166K -CONTINUE WASHING DOWN,TAG SAND AT 6031' -DRY DRILL 20 MINUTES -40 RPM,4-6K TORQUE,8K WOB -VERIFY ON TOP OF SAND, INCREASE PUMP TO 210 GPM,OBSERVE WOB FALL OFF -POOH 30'AND SHUT DOWN PUMPS,SLACK OFF AND TAG AT 6033' SPR'S TAKEN AT 5922' Printed 12/1/2014 11:36:28AM North America-ALASKA BP ,, Page 26 of 29 Operation Summary Report && Common Wet Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date. 1X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release. Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual 183.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 17:00 - 18:30 1.50 CLEAN P OTHCMP CIRCULATE BOTTOMS UP -RACK BACK 1 STAND IN DERRICK -CBU 1.5X'S -630 GPM,2100 PSI -NO ROTATION,NO PIPE RECIPROCATION -OBSERVED SMALLAMOUNT OF SAND AND CEMENT AT BOTTOMS UP 18:30 - 20:30 2.00 CLEAN P OTHCMP CUT AND SLIP -PJSM BID TOP DRIVE -CUT AND SLIP 60'OF DRILLING LINE -SERVICE TOP DRIVE,CALIBRATE BLOCK HEIGHT -MONITOR WELL ON TRIP TANK,CIRCULATE ACROSS TOP OF HOLE 20:30 - 23:00 2.50 CLEAN P OTHCMP POOH -PJSM -SEA WATER 8.5 PPG IN,8.5 PPG OUT -POOH ON ELEVATORS FROM 5938'MD TO 924'MD -PU 177K,SO 150KAT 5938'MD -OBSERVED NO TIGHT HOLE AT 23.00 - 00:00 1.00 CLEAN P OTHCMP UO 8-1/2"CLEANOUT BHA#13 PJSM FOR HANDLING BHA WITH BAKER REPAND RIG CREW -MONITOR WELL FOR 20 MINUTES,STATIC -C/O 4"ELEVATORS,INSTALL 5"ELEVATORS -STAND BACK 5"HWDP,1 STAND OF 6-1/4" DRILL COLLARS 11/29/2014 00:00 - 00:30 0.50 CLEAN P OTHCMP SERVICE RIG 00:30 - 02:00 1.50 CLEAN P OTHCMP UD 8-1/2"CLEANOUT BHA#13 -PJSM FOR CLEANING OUT BOOT BASKETS MONITOR WELL FOR 10 MINUTES,STATIC 1-STAND BACK 6-1/4"DRILL COLLARS CLEANOUT BOOT BASKETS,SMALL AMOUNT OF SAND AND CEMENT,TWO CUPS OF ES CEMENTER DEBRIS(BRASS AND ALUMINUM),PICTURES INCLUDED 02:00 - 05:30 3.50 CLEAN P OTHCMP P/U RCJB CLEANOUT BHA#14 -PJSM WITH BAKER AND RIG CREW -SEND 8-1/2"CLEANOUT BHA#13 COMPONENTS OFF FLOOR -BRING RCJB CLEANOUT BHA#14 COMPONENTS TO FLOOR -M/U RCJB CLEANOUT BHA#14 F/SURFACE T/882' 05:30 - 08:00 2.50 CLEAN P OTHCMP j RIH RIH WITH RCJB CLEANOUT BHA#14F/ SURFACE T/2200'MD RIH ON ELEVATORS OUT OF DERRICK -RIH F/882'T/5914' -FILL PIPE EVERY 20 STDS -MONITOR HOLE FILL ON TRIP TANK Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 27 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) • 08:00 - 09:30 1.50 CLEAN P OTHCMP WASH DOWN TO TOP OF EZSV RIH F/5914'T/6009' -OBTAIN PUMP PRESSURES 126 GPM,120 PSI,210 GPM 330 PSI,294 GPM,620 PSI SHUT PUMPS DOWN DROP BALL,STAGE PUMPS UP TO 7 BPM -CIRCULATING PRESSURE INCREASED TO •790 PSI WITH BALL ON SEAT AND THEN DROPPED BACK TO 620 PSI -INCREASE PUMP RATE TO 420 GPM,1500 PSI -SHUT PUMPS OFF AND RIH,TAG @ 6034', STACK 5K WOB -P/U AND WASH DOWN F/6034'T/6046' -420 GPM,1500 PSI ON,1500 PSI OFF -PU 180K,SO 153K,ROT 165K 40 RPM,3K TQ ON,3K TQ OFF -SHUT DOWN ROTARY,INCREASE PUMP RATE 504 GPM,2450 PSI -P/U AND S/O TO 6046'TO VERIFY TOP OF EZSV,4X'S 09:30 - 10:30 1.00 CLEAN P OTHCMP CIRCULATE PUMP 30 BBL HI-VIS SWEEP SURFACE TO •SURFACE 500 GPM,2450 PSI -20 RPM,3K TQ -OBSERVE GOOD SAND RETURNS WITH SOME ALUMINUM SHAVINGS AT BUS 10:30 - 12:00 1.50 CLEAN P OTHCMP PRESSURE TEST CASING -PJSM,REVIEW PRESSURE CROSSCHECKLIST -TEST 250 PSI FOR 5 MIN,3650 PSI 30 MIN, • TEST GOOD -6.8 BBLS PUMPED,6.5 BBLS BLED BACK INFORM WTL OF TEST RESULTS,RECEIVE APPROVAL TO PROCEED 12:00 - 12:30 0.50 CLEAN P OTHCMP BLOW DOWN -R/D TESTING EQUIPMENT B/D CHOKE AND KILL LINES 12:30 - 15:00 2.50 CLEAN P OTHCMP POOH -PJSM FOR POOH -P/U SINGLE OFF SKATE,S/O AND TAG EZSV AT 6046' -MONITOR WELL FOR 10 MINUTES,STATIC POOH F/6046'T/913' 15:00 - 17:00 2.00 CLEAN P OTHCMP UD BHA -PJSM WITH CREWAND BAKER REP -MONITOR WELL PRIOR TO PULLING BHA THROUGH BOPE,STATIC -STAND BACK 5"HWDP AND 3 STANDS OF 6-1/4"DC -B/D AND LAY DOWN BOOT BASKETS AND RCJB. Printed 12/1/2014 11:36:28AM • North America-ALASKA-BP Page 28 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 18:30 1.50 CLEAN P OTHCMP L/D BHA -PJSM WITH CREW AND BAKER REP, HANDLING BHA COMPONENTS,DISCUSS HAND SAFETY AND HAMMER USE WHEN CLEANING BOOT BASKETS -RECOVER ES CEMENTER OPERATING SLEEVE IN RCJB -CLOSE BLINDS -CLEAR FLOOR AND BRING BHA COMPONENTS FOR WHIPSTOCK TO FLOOR 18:30 - 22:00 3.50 WHIP P WEXIT P/U WHIPSTOCK BHA -PJSM WITH CREW BAKER AND SLB REPS, DISCUSS HANDLING WHIPSTOCK,PLAN FOR BUILDING BHA WITH MINIMAL XO'S 'REQUIRED FOR FOSV AND SAFETY JOINT -P/U MWD,XO'S,WHIPSTOCK WSL AND BAKER REP VERIFY NUMBER OF SHEAR SCREWS,3 EA.TOTAL,REMOVE SET SCREW AND GIVE TO WSL,REVIEW AND SIGN WHIPSTOCK CHECKLIST -SCRIBE AND MEASURE RAMP OFFSET FROM TOOLFACE M/U 3 STANDS 6-1/4"DRILL COLLARS,AND 5"HWDP 22:00 - 00:00 2.00 WHIP P WEXIT RIH -RIH WITH WHIPSTOCK F/949'T/1804' -SHALLOW TEST MWD AT 1804' -STAGE PUMPS 150 GPM-140 PSI,400 GPM- 430 PSI,475 GPM-650 PSI -UNABLE TO GET A SURVEY -REDUCE PULSATION DAMPENER PRESSURE TO 450 PSI,REPLACE BAD SENSOR ON MANIFOLD 11/30/2014 00:00 - 00:30 0.50 WHIP P WEXIT SHALLOW TEST MWD -TEST MEASURE WHILE DRILLING TOOLS AT 1,804'-GOOD SURVEY -CIRCULATE 450 GPM -SHUT DOWN PUMPS AND BLOW DOWN TOP DRIVE 00:30 - 05:00 4.50 WHIP P WEXIT RIH ON ELEVATORS -RIH WITH WHIPSTOCK F/1804'T/5887' -90 SECONDS/STAND MAX RUNNING SPEED -BREAK CIRCULATION EVERY 20 STANDS, 126 GPM,90 PSI -MONITOR HOLE FILL ON TRIP TANK 05:00 - 06:00 1.00 WHIP P WEXIT SET WHIPSTOCK -CIRC 450 GPM,ORIENTATE RAMP 60 DEGREES LEFT -PU 185K,SO 155K -RIH F/5,887'T/6,053' -SHUT DOWN PUMPS -RIH F/6,035'T/6,045',STACK 5K WOB AT 6045' -SLACK OFF AND SHEAR ANCHOR WITH 18K WOB,S/0 TO 20K WOB -P/U 10K OVERPULL TO 195K TO CONFIRM ANCHOR SET -SLACK OFF AND SHEAR BOLTS WITH 50K WOB Printed 12/1/2014 11:36:28AM North America-ALASKA-BP Page 29 of 29 Operation Summary Report Common Well Name:Y-14 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/17/2014 End Date: X3-015RC-C:(9,088,000.00) Project:Prudhoe Bay Site:PB Y Pad Rig Name/No.:DOYON 14 Spud Date/Time:9/20/1988 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292183200 Active datum:Y-14C actual @83.38usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 07:30 1.50 WHIP P WEXIT DISPLACE WELL. -DISPLACE 8.5 PPG SEAWATER WITH 9.4 PPG LSND MILLING FLUID -PUMP 40 BBLS 9.4 PPG LSND HIGH VIS SPACER -459 GPM,817 PSI -PUMP 438 BBLS 9.4 PPG LSND -459 GPM,817 PSI 07:30 - 08:00 0.50 WHIP P WEXIT SPACE OUT TO MILL WINDOW -POOH ON ELEVATORS F/6020'T/5960' -RACK BACK 1 STAND -PICK UP SINGLE FROM PIPESHED TO SPACE OUT FOR MILLING WINDOW RIH F/5960'T/5992' 08:00 - 08:30 0.50 STWHIP P WEXIT RIH,OBTAIN PARAMETERS -RIH F/5992'T/6024',TAG WHIPSTOCK -420 GPM,940 PSI ON,940 PSI OFF -70 RPM,3K TORQUE OFF -PU 180K,SO 155K,ROT 167K P/U TO SERVICE RIG 08:30 - 09:00 0.50 STWHIP P WEXIT RIG SERVICE 09:00 - 09:30 0.50 STWHIP N RREP 6,044.38 WEXIT 'CHANGE OUT POP OFF ON MUD PUMP#2. 09:30 - 20:00 10.50 STWHIP P WEXIT MILL WINDOW ✓ SV04/ - -MILL F/6024'T/6060' r -580 GPM,1570 PSI ON,1570 PSI OFF y-l i V -100 RPM,4-5K TQ ON,3-4K TQ OFF -PU 180K,SO 155K,ROT 167K 20:00 - 21.30 1.50 STWHIP P WEXIT CBU -CIRCULATE HI-VIS SWEEP SURFACE TO SURFACE -590 GPM,1590 PSI -NO INCREASE IN RETURNS OBSERVED AT BUS *SPRS TAKEN AT 6019'MD,5742'TVD 21:30 - 00:00 2.50 STWHIP P WEXIT LOT -L/D SINGLE TO GET BACK ON EVEN STANDS -RIG UP AND PERFORM LOT -MUD WEIGHT:9.4 PPG,5742'TVD,6033'MD -PUMP 4.1 BBLS TO 1200 PSI,BLEED BACK 2.5 BBLS -LOT EMW=13.4 PPG -R/D TEST EQUIPMENT AND BLOW DOWN 12/1/2014 00:00 - 03:30 3.50 STWHIP P WEXIT POOH -PJSM -MONITOR WELL FOR 10 MINUTES,STATIC -MUD WEIGHT 9.4 PPG IN,9.4 PPG OUT -POOH ON ELEVATORS F/5982'MD T/1044' MD PU 170K,SO 155K AT 5982'MD 03:30 - 06:00 2.50 STWHIP P WEXIT L/D WHIPSTOCK BHA -PJSM -MONITOR WELL FOR 10 MINUTES,STATIC -L/D BHA F/1044'T/SURFACE -RACK BACK 3 STANDS OF 5"HWDP,L/D 3 STDS OF 6-1/4"DC'S Printed 12/1/2014 11:36:28AM T1RIEE= , 4-1/ Y 14 B WF1L'I-EAD= MCECEVOY OY � SA NOTES:W ELL ANGLE>70°@ 10319'. ;!ACTUATOR= AM-ISDN_ 0KB.ELEV= 79.8' lj [ BF ELEV= 50.6' KOP= 4250' 20"CONDUCTOR, 110' Max Angle= 99°@ 11377' -#, Datum MD _ 10178' ID' ST ND I VI 1 DEV TYPE VLV LATCH PORT DATE Datum TVD= 8800'SS 6 3002 3001 1 MG DMY RK 0 03/26/14 13-3/8"CSG,68#,L-80 BUTT,ID=12.415" H 2686' 5 5096 5010 38 MAG DMY RK 0 03/26/14 4 6714 6272 39 MAG DMY RK 0 03/26/14 9-5/8"VVHPSTOCK(11/30/14) 6024' 3 8319 7465 41 MG DMY RK 0 08/11/01 9-5/8"EZSV(11/22/14) H I 6046' 2 9012 7997 38 MAG EMPTY RK 10/02/14 1 9166 8119 37 MIG 'DMY RK 0 08/11/01 TBG CUT(10/27/14) 6542' *STA#1=BENIN)STRADDLE PKR TOP OF CEMENT(10/10/14) H 7530' _ ' ` ' 9091'-9986' -4-1/2"BKR KB LTR D=2.37"(09/23104) Minimum ID = 2.37" @ 9091' �N 9096' I-2-7/8"X 3-1/2"XO,D=2.390 4-1/2" BKR KB STRADDLE PKR ■■ • �A 13,0 Iv .:.:), 9243' I-9-5/8"X 7"BKR LTP w/LNR HGR,D=6.31" TOP OF 7"LNR 9807' egg MLLOUT WIVDOW(Y-14A) 9421'-9466' 9-5/8"CSG,47#,L-80 - 10052' ie.ii,er ... _.,.„ 0. : ,,,,;>x:4 NSCC/BUTT,D=8.681" ' x 9993' 4-1/2"BKR KB STRADDLE PKR,D=2.380"? TOP OF CEMENT(09/27/14 TAGGED) H 9653'SLM 4 10025' 4-1/2"FES X NP,13=3.813" T 3-1/2"TBG,9.3#,L-80 STL,.0087 bpf,ID=2.992" 9984' 44- D 10036' -7"X 4-1/2"BKR S-3 PKR,ID=3.875" F 10059' I-4-1/2"FES X NP, =3.813" • . 10081' I-4-1/2"HES XN NP,MLLED TO 3.80"D I4-1/2"TBG,12.6#,L-80,.0152bpf,ID=3.958" -I 10093' ir ie Air Ab Iv 10093' 4-1/2"VVLEG,D=3.958" 10096' H EMD IT LOGGED 03/16/96 S4kier.43' 10398' H 7"X 4-1/2"TNV SS PKR,D=3.923" 7"LNR,29#,L-80 BTC-M,.0.71 bpf, D=6.184" - 10541' F". _ 10490' H 4-1/2"PORTED JT,D=3.915" PERFORATION SLIMIvtARY I I I I REF LOG:EVN24/GR(MD)10/27/95 ANGLE AT TOP PERF:53°@ 10168' 10620' 4-1/2"MLAS l7',D=3.88" Note:Refer to Production DB for historical perf data I I SIZE SPF I'TTERVAL Opn/Sqz SHOT SQZ I I 3-3/8" 6 10168-10198 S 03/15/96 09/27/14 El 0 10811' -CTC ECP,D=3.98" 4-1/2" SLID 10532-11276 SLOT 10/28/95 4-1/2" SLID 10649-10759 SLOT 10/28/95 I I I I 4-1/2" SLID 10649-10759 SLOT 10/28/95 I I 4-1/2" SLTD 11156-11276 SLOT 10/28/95 I I • • 11154' H WV NO-GO SUB,MLLED TO 3.80" Y-14B I I 3-3/4" OH 11300-12171 C 08/07/01 MLLOUT VVINDOW(Y-14B) 11291' I \ 4-1/2"LNR, 12-6#,L-80 NSCT,.0152 bpf,D=3.93" -{ 11300' \ __--- • 3-3/4"OPEN HOLE BAREFOOT ID -I 12171' --_____----:-----=— l J DATE REV BY COMAE3JFS DATE REV BY COMMENTS PRUDHOE BAY INT 10/07/88 QUES. ORIGINAL COMPLEITON _ 10/09/14 JWAIJNI3 GLV C./0(10/02/14) WELL: Y-14B 11/01/95 LINDER SIDETRACK(y-14A) FERMTTNo:"L011010 08/07/01 CWKAK CTD TOE OUT DRILL (Y-1413) API No: 50-029-21832-02 07/10/14 PJC REFORMAT(PRE RIG CLEANUP) SEC 34,T11 N,R13E,492'FM.&706'FWL 09/22/14 DLW/JMD PULLED 4-1/2"WRP(09/21/14) 10/09/14 RKT/JMD P&A STAGE 1 (9/27/14) BP Exploration(Alaska) Imag[ '~roject Well History' File Coverill ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. C;~-O~-- J 0 J- Well History File Identifier Organizing ~o,~ [] RESCAN ~ Color items: [] Grayscale items: D Poor Quality Originals: [] Other: NOTES: DIGITAL DATA Diskettes, No. [] Other, No/Type BY: BEVERLY ROBIN VINCENT SFIERYI~~INDY OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds . D. Other Project Proofing BY: BEVERLY ROBIN VINCENT SHERYGWINDY Scanning Preparation / x 30 =_.~__0 BY: BEVERLY ROBIN VINCENT SHERYL~WINDY Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: ~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ,,i~(/ YES BY: BEVERL~INCENT SHERYL MARIA WINDY Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES ) NO NO RESCANNED B*¢': BEVERLY ROBIN VINCENT SHERYL MARIA WINDY General Notes or Comments about this file: DATE: IS~ Quality Checked 12110/02Rev3NOTScanned.wpd • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 20, 2010 , 20 $ �.. Mr. Tom Maunder Alaska Oil and Gas Conservation Commission '�� 333 West 7th Avenue ,,, n � � - Anchorage, Alaska 99501' ? F !Ara. _slo(1 Subject: Corrosion Inhibitor Treatments of GPB Y Pad cgr)1 40 1 Dear Mr. Maunder, - i 4- L3 Enclosed please find multiple copies of a spreadsheet with a list of wells from Y Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Jerry Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 12/20/10 Corrosion Well Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal Y -01B 2010760 50029203940200 NA 2.5 NA 8.50 4/11/2010 Y - 02A 2011730 50029203950100 NA 0.1 NA 0.85 4/11/2010 Y - 03A 2042350 50029204110100 NA 2.2 NA _ 18.70 4/16/2010 Y - 04 1791050 50029204230000 NA 1 NA 5.10 4/11/2010 Y -05B 2081380 50029204360200 NA 3.3 NA 20.40 4/15/2010 Y - 06A 2042510 50029204310100 NA 0.7 NA 3.40 4/16/2010 Y - 07A 2071050 50029205600100 14.5 2.0 0.3 NA 1.70 8/4/2010 Y -08A 1880560 50029205720100 NA 4 NA 15.30 8/5/2010 Y - 09A 1970830 50029205790100 19 1.5 3.6 NA 17.00 8/4/2010 Y -10A 2042500 50029205870100 19 3.0 8.75 NA 54.40 8/6/2010 Y - 11C 2051640 50029205130300 NA 0.1 NA 0.90 4/14/2010 Y - 13 1811120 50029206340000 NA 0.4 NA 3.40 4/15/2010 ■ >Y -1413 201101Q 50029218320200 _ NA 3.8 NA 20.40 4/10/2010 Y -15A 2010890 50029209400100 NA 2.1 NA 11.90 4/10/2010 Y - 16 1830490 50029209320000 18.8 2.0 1.7 NA 10.20 8/4/2010 Y - 18 1830290 50029209160000 NA 0.8 NA 5.10 4/9/2010 Y - 19 1880960 50029218570000 NA 0.2 NA 0.85 4/15/2010 Y - 20A 2010250 50029215870100 NA 1.5 NA 11.90 4/14/2010 Y - 21A 1950370 50029215740100 NA 0.1 NA 1.70 4/13/2010 Y - 22A 1881150 50029215580100 NA 0.5 _ NA 3.40 8/4/2010 Y -23B 2031640 50029215900200 NA 1.2 NA 6.80 4/13/2010 Y - 24 1861130 50029216080000 NA 1 NA 6.80 4/12/2010 Y - 25A 2081400 50029218830100 NA 0.3 NA 1.70 4/18/2010 Y - 26A 2010430 50029221910100 NA 0.3 NA 1.70 4/15/2010 Y - 27 1900280 50029220190000 NA 0.5 NA 3.40 4/14/2010 Y - 28 1910650 50029221690000 NA 3.5 NA 28.90 4/12/2010 Y - 29A 1960910 50029221230100 _ NA 0.2 NA 1.70 4/13/2010 Y -30 1910150 50029221350000 NA 0.5 NA 2.60 4/13/2010 Y -31 1910560 50029221610000 NA 0.5 NA 3.40 4/12/2010 Y - 32 1910410 50029221490000 NA 0.3 NA 1.70 4/18/2010 Y - 33 1910300 50029221440000 NA 0.9 NA 6.80 4/12/2010 Y - 34A 1990040 50029221780100 NA 0.9 NA 5.10 4/11/2010 Y - 35A 2022370 50029221860100 NA 1.5 NA 10.20 4/15/2010 Y - 36 1931310 50029224000000 NA 0.9 NA 5.95 4/10/2010 Y - 37A 2020460 50029224030100 NA 0.8 NA 6.00 4/14/2010 e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _ Inserts\Microfilm _Marker. doc Permit to Drill 2011010 DATA SUBMITTAL COMPLIANCE REPORT 7~30~2003 Well Name/No. PRUDHOE BAY UNIT Y-14B Operator BP EXPLORATION (ALASKA) INC MD 12171 /,,/ TVD 9038 - Completion Dat 8/6/2001/' Completion Statu 1-OIL Current Status 1-OIL API~No. 50-029-21832-02-00 UIC N REQUIRED INFORMATION Mud Log N_~o Sample N._.~o Directional Survey No DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Digital Digital Type Media Fmt (data taken from Logs Portion of Master Well Data Maint) ED D Ver LIS Verification Interval Log Log Run OH I Dataset Name Scale Media No Start Stop CH Received Number Comments 1 11284 12171 Open 2/21/2002 10615-''''~- Well Cores/Samples Information: Name Interval Dataset Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y N~ Chips Received? Analysis R P.c.P. iv~.d ? Daily History Received? ~ N Formation Tops {~/N Compliance Reviewed By: Transmittal Form BAKER HUGHES Baker Atlas Canada GEOSciences Centre To: State of Alaska, Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Attention: Lisa Weepie Reference: Prudhoe Bay North Contains the following: ... 1 - LAS Format disk .. 3 - Films ...' .:. .... ':i . . ..... . 1 - Measured Depth MWD GR Print i: : .... ' 1 - Ultra-Slim Multi Pr°pagati°n, ResistiVity GR Print" ... 1 - TVD-USMPR-GR Print "· ............ .... · .' '._' ........ .... ........... . . ...... 7 ............. . ·2..'.. ' ....... .............. ........................................ ..... .... · ;::! .... ~.~'.. --- "7' (2"'-' . '" .. ..... · __'._ · ............ ..... :-.-' --!-v ..',~ . '.' Sent By: JosefBerg Date: Feb ..... '"- ..... ':--"-' i~°~EiVE mm m~j mm~ mm :~m~ ~2 ~m 5m 2m' ~ m m '~ .... · '.i-V.T-~7. ? '~ .-~..rT.='7 . ~:i.__ :... 's..., ..i .... Received Date: ,...,:~-. .......... :.,- .... .-' ' FEB 212002 PLEASE AC~OWLEDGE ~CEIPT BY SIGNING ~'~~~~='i~n'::~:--:::'''''-~''==- =::':':~'-=¥'"':' OR FAXING YOUR COPY FAX: (403) 537-3767 [~.:~'~;'~.'~;;;~.~ .... .......... Baker Atlas '~-,-,~;?-,~; ~ 1300, 401-9th Ave. S.W ....... Calgary, Alberta, Canada T2P 3C5 Direct: (403)537-3752 ~2 .... FAX: (403) 537-3767 ( STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMM~;SSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Extension 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service [] TSUSP 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 201-101 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21832-02 4. Location of well at surface: ~f":~':?'"'-'i~';i'~i~:"'~i"'7'~..'""'~'"""' t~ 9. Unit or Lease Name 492' SNL, 706' EWL, SEC. 34, T11N, R13E, ua , ~.,:,¥.~ ~ =. YE~I,B~. ~ Prudhoe Bay Unit At top of productive interval 4291' SNL, 362' WEL, SEC. 33, T11N, R13E, UM At total depth *~ .... '"'7'7£'--I .... ~ 10. Well Number Y-14B 123' SNL, 1472' WEL, SEC. 04, T10N, R13E, UM J 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool KBE = 85' ADL 047471 12. Date Spudded8/1/2001 113' Date T'D' Reached 114' Date C°mp'' Susp'' °r Aband'8/4/2001 8/7/2001--¢//4'/~i .~ 115' water depth' if °ffsh°reN/A MSL 116' N°' °f C°mpleti°nsOne 17. Total Depth (MD+TVD) 118. Plug Back Depth (MO+TVD) 119. Directional Survey 120. Depth where SSSV set121. Thickness of Permafrost 12171 9038 FTI 12171 9038 FTI []Yes [] NoI (Nipple) 2192' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR 23. CASING, LINER AND CEMENTING RECORD , CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM S~ZE CEMENTING RECORD AMOUNT PULLED 20" Insulated Conductor Surface 110' 3 cu yds Concrete 13-3/8" 68# L-80 Surface 2686' 17-1/2" )723 cu ft Arcticset II and III 9-5/8" 47# L-80 Surface 9416' 12-1/4" _>116 cu ft Class 'G' 7" 29# L-80 9243' 10541' 8-1/2" _>98 cu ft Class 'G' 4-1/2" 12.6# L-80 10398' 11300' 6" Llncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SiZE DEPTH SET (MD) PACKER SET (MD) (From Y-14A) 3-3/4" Open Hole 4-1/2", 12.6#, L-80 10093' 10036' MD TVD MD TVD Existing Perf's 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 10168'- 10198' 8878'-8895' 11300'- 12171' 9000'-9038' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 4-1/2" Slotted Liner 2000' Freeze Protect with MeOH 10532' - 10614' 8979' - 8986' 10649' - 10769' 8987' - 8985' 10868' - 11154' 8987' - 8997' 11156' - 11276' 8997' - 9000' 27. PRODUCTION TEST , , Date First Production Method of Operation (Flowing, gas lift, etc.) August 23, 2001 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-DEL CHOKE SIZE ~ GAS-OIL RATIO 9/1/2001 4 TEST PERIOD 1469 8446 1122 176I 5750 Flow Tubing 3asing Pressure CALCULATED OIL-DEL GAS-MCF WATER-BBL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 25.2 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. 'RECEIVED SEP .Alaska Oil & Gas Cons. Commission Anchorage Form 10-407 Rev. 07-01-80 ORIGINAL Submit In Duplicate 29. Geologic Markers 30. Formation Tests Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered Depth Depth and gravity, GOR, and time of each phase. Top of Sadlerochit 11403' 8991' Top of Sadlerochit 11520' 8990' Top of Sadlerochit 11549' 8989' 31. List of Attachme'nts: Summary of Daily Drilling Reports, Surveys .......... , , 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble ,~r,/~~ Title Technical Assistant Date ~)~'/::::~'{~)} Y-14B 201-101 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No./~pp[ova! No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: Y-14B Rig Accept: 07/29/01 Field: Prudhoe Bay Unit Rig Spud: 08/01/01 APl: 50-029-21832-02 Rig Release: 08/07/01 Permit: 201-101 Drilling Ri~]: CDR PRE - RIG WORK 05/22/01 Pressure test tubing and casing hangers for CTD sidetrack. Test passed. 06/13/01 Run 3.625" dummy whipstock. Locate tubing tail at 10081' sim, corrected 10096'. No problems. Run 4-1/2" slipstop catcher sub, set at 9078' sim. Pulled and dummied off GLM's. 06/14/01 Good MITIA. 06/16/01 RIH with 3-1/8" Vent JB. Venturi from 10300' to 11264' without seeing any set down at TIW, 'no go' sub at 11154. Recovered formation sand, rubber chunks, shear stock and small pieces of metal. Perform State required BOPE test - Passed. Run in hole with 2-7/8" motor and 3.80" mill. 06/19/01 Milled through 'XN' nipple at 10077' ctmd. Dress nipple. Dry run good. Continue in hole and mill through 'no-go' sub at 11142' ctmd. Dress 'no-go'. Continue in hole milling with several hard stalls between 11221' and 11228'. Pump 20 Bbl. Biozan sweep and pull out of hole to inspect mill - ok. Pick up Vent JB. Run in hole, set down on liner top at 10389'. Work, no good. Pull out of hole for orienter. Run in hole with Venturi basket and orienter, through top of liner. Clean hole to 11264' ctmd. Pull out of hole. Recover chunks of rubber, 2" hard line gasket, and various pieces of shear stock. Cut pipe and re-head. Run in hole with 2-7/8" motor with 3.80" mill. 06/20/01 Dry run through 'no-go' sub. Sat down at 11264' ctmd, pack-off. Mill through and dress pack-off. Dry run through pack-off was good. Pump Biozan sweep. Found shoe at 11288' ctmd. Mill through shoe. ' Estimate milling formation at 11290' ctmd. Milled to 11291 '+. Pump Biozan sweep. Pull out of hole at 80% loading tubing with KCL. Freeze protect tubing to 2000' with Methanol. 06/23/01 MIT-OA passed to 2000 psi. 07/12/O 1 Tubing leaks detected at 9180' and 9820'. BP EXPLORATION Page 1 of 6 Operations Summary Report Legal Well Name: Y-14 Common Well Name: Y-14B Spud Date: 9/20/1988 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/7/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/7/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 7/28/2001 18:00 - 20:00 2.00 MOB P PRE PJSM. General rig down & preparations to move rig to Y-14A. Cranes to be used for exception move. Layover coil. Lower coil trailer. Lower Scissor sub. 20:00 - 00:00 4.00 MOB P PRE RD & move off pits, boilers, generator sets & tool shed. 7/29/2001 00:00 - 06:00 6.00 MOB P PRE Move off coil trailer with crane. Pull sub off Y-01B. P/U mats. Relocate camp to Y-14A. Lay herculite & mats on Y-14A & spot sub. 06:00 - 13:00 7.00 MOB P PRE Spot mats and spot scissor trailer. Spot coil trailer with cranes. Spot both generator buildings, electrician's shop, pits, boilers, & both pumps with crane. Lay herculite & berm. Finish all berms. 13:00 - 19:00 6.00 MOB P PRE Spot cuttings box & berm. Raise scissor trailer, coil trailer, derrick & scope up derrick. Raise catwalk. Spot M-I shack. Finish PJU boilers. 19:00 - 22:30 3.50 BOPSUF P DECOMP RIG ACCEPTED @ 19:00 HRS on 7/29/01. PJSM. N/U BOPE. Function tested BOPE - OK. 22:30 - 00:00 1.50 WHSUR P DECOMP R/U & test DSM lubricator. Pull BPV & bleed off 250 psi on wellhead. 7/30/2001 00:00 - 02:00 2.00 WHSUR P DECOMP Install 2WCV. R/D DSM lubricator. 02:00 - 10:30 8.50 BOPSUF P DECOMP PJSM. Pressure test BOPE as per AOGCC regulations. Witnessing of test waived by State Rep John Spalding. 10:30 - 12:30 2.00 WHSUR P DECOMP PJU & test DSM lubricator. Pull 2VVCV. Had 200 psi on wellhead. PJD lubricator. 12:30 - 16:00 3.50 KILL P DECOMP- Cut-off slip-on coil connector + 100' of coil. Weld on new 3.125" OD coil connector. Pull test WOC to 26k & pressure test to 2500psi - OK. 16:00 - 17:00 1.00 KILL . P DECOMP' M/U MHA & nozzle BHA#1. 17:00 - 19:30 2.50 KILL N RREP DECOMP Changeout encoder & wheel on depth counter. Attempt to RIH BHA#1, depth counter not tracking properly. Troubleshoot, changeout & repair depth encoder. Meanwhile observe bent coil on top of WOC. To cut & re-weld new WOC after JB run. 19:30 - 20:45 1.25 KILL P DECOMP Strip BHA#1 to 2200' maintaining 100 psi over hydrostaic with manual choke. 20:45 - 22:00 1.25 KILL P DECOMP Displace out FP fluid from wellbore with KCL. Shut in well & observe 0psi VVHP. PUH to 1900'. Open up well & observe 0.25bpm flow. Shut-in well. 22:00 - 00:00 2.00 KILL P DECOMP Strip BHA#1 maintaining 100 psi over hydrostaic with manual choke to EOP @ 7600' (-30.5' correction). Continue stripping to 9000'. 7/31/2001 00:00 - 04:00 4.00 KILL ~ DECOMP Circulate 155 bbls KCL around. Displace KCL to FIo Pro. 04:00 - 07:00 3.00 KILL ~ DECOMP POOH. Monitor well @ 500', well stable. 07:00 - 10:00 3.00 CLEAN ~ DECOMP Cut 5' off coil, (kink in coil), weld on new coil connector, pull & pressure test same, OK. 10:00 - 13:30 3.50 CLEAN ~ DECOMP RIH w/venturi basket. 13:30 - 14:00 0.50 CLEAN ~ DECOMP Tag @ 11,279', (uncorrected depth), & circulate on bottom w/ venturi. 14:00 - 17:00 3.00 CLEAN ~ DECOMP POOH w/venturi, monitor well @ 500', well stable. 17:00 - 18:30 1.50 CLEAN ~ DECOMP LJD venturi basket BHA, recovered formation & small amount of rubber. 18:30 - 20:45 2.25 DRILL ~ PROD1 M/U drilling BHA w/resistivity 20:45 - 21:00 0.25 DRILL ~ PROD1 RIH, shallow hole test, OK. 21:00 - 21:45 0.75 DRILL ~ PROD1 Service injector. 21:45 - 23:30 1.75 DRILL ~ PROD1 Continue in hole, tie into EOP flag, subtract 41' correction. Printed: 8/21/2001 3:59:07 PM BP EXPLORATION Page 2 of 6 Operations Summary Report Legal Well Name: Y-14 Common Well Name: Y-14B Spud Date: 9/20/1988 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/7/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/7/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 713112001 23:30 - 00:00 0.50 DRILL P PROD1 Tie in w/gamma. 8/1/2001 00:00 - 02:00 2.00 DRILL P PROD1 Continue to log tie in, relog top marker, add 36' correction. 02:00 - 02:20 0.33 DRILL P PROD1 RIH to bottom, tag @ 11,312'. 02:20 - 02:45 0.42 DRILL P PROD1 Orient to 60R. 02:45 - 03:30 0.75 DRILL P PROD1 Drill ahead f/11,312'-11,381'. TF 60-80R, 2800 spi @ 2.5 bpm freespin, 300 psi dp on motor. 34K up wt, 25K dh. ROP 100 ,I PROD1 fph, zone 4b. 03:30 - 04:00 0.50 DRILL P Flow off survey. 04:00 - 04:15 0.25 DRILL N STUC PROD1 Stall & pull heavy @ 11,375', work pipe to 15K over up weight, slack off, pumps off, relax pipe & pull free. 04:15 - 05:45 1.50 DRILL P PROD1 Drill ahead f/11,381 '-11,434', TF 130-150R to drop angle as inclination up to 98 deg. ROP 50 fph. 05:45 - 06:00 0.25 DRILL P PROD1 Orient to 80-90R. 06:00 - 06:45 0.75 DRILL P PROD1 Drill ahead f/11,434'-11,485', leveling off at TVD of 8905'. 06:45 - 07:15 0.50 DRILL P PROD1 Orient TF to 80-90R to hold angle. 07:15 - 07:45 0.50 DRILL P PROD1 Drill ahead to 11,510', completed turn, 8905' 'rVD, 89:5 deg inclination. Resistivity tool acting up. 07:45 - 11:00 3.25 DRILL P PROD1 POOH to adjust motor, cio resistivity tool. EOP flag @ 10,000', monitor well @ 500', well stable. Bleed off OA to 100 psi, fluid packed, (diesel), & double valve IA on one side, blind off IA valve on opposite side. 11:00 - 12:30 1.50 DRILL P PROD1 Adjust motor to 1 degree, perform service checks on USMPR, no problems w/tool, believe anomoly due to formation change & high level of pyrite ....... may have crossed fault. 12:30 - 15:15 2.75 DRILL P PROD1 RIH, shallow hole test, OK. Tie into EOP flag, subtract 8' correction. 15:15 - 17:00 1.75 DRILL P PROD1 Tie in w/gamma, add 6' correction.. 17:00 - 17:30 0.50 DRILL P PROD1 Continue in hole, tag @ 11,510'. 17:30 - 18:45 1.25 DRILL P PROD1 Drill ahead f/11,510'-11,590'. TF 130-140L, ROP 75 fph. 3000 psi off, 3300 psi on, 2K WOB. 18:45 - 19:15 0.50 DRILL P PROD1 Orient to 90L. 19:15 - 20:45 1.50 DRILL P PROD1 Drill ahead to 11,662'. 120:45 - 21:00 0.25 DRILL P PROD1 Orient TF to 90R. ~21:00 - 21:30 0.50 DRILL P PROD1 Drill ahead to 11,707' @ 100R. Resistivity/gamma failure, consult w/town, OK to drill ahead to 12,400'. 21:30 - 21:45 0.25 DRILL P PROD1 Wiper trip to shoe, pulling heavy @ shoe, unable to pull thru shoe w/20K over up wt. No problem going down. 21:45 - 22:15 0.50 DRILL P I PROD1 RBIH to drill ahead. 22:15 - 22:45 0.50 DRILL P ~PROD1 Orient to 90-100R. 22:45 - 23:15 0.50 DRILL P ~PROD1 Drill ahead to 11,718'. 23:15 - 23:45 0.50 DRILL P 'PROD1 Stalled, TF flopped, oreint to 100R. 23:45 - 00:00 0.25 DRILL P PROD1 Drill ahead to 11,738', ROP 75 fph. 8/2/2001 00:00 - 00:15 0.25 DRILL P PROD1 Continue to drill ahead to 11,751'. TF flopped when motor stalled. 00:15 - 00:30 0.25 DRILL P PROD1 Orient to 90R. 00:30 - 00:45 0.25 DRILL P PROD1 Drill ahead to 11,757', TF flopped after sharp stall. 00:45 - 01:10 0.42 DRILL P PROD1 Orient to 90R. 01:10 - 01:30 0.33 DRILL P PROD1 Drill to 11,763', TF flopped. 01:30 - 04:00 2.50 DRILL N STUC PROD1 POOH f/orienter & USMPR tool. Unable to pass thru shoe. Appears to be hanging up @ coil connector. Consult w/town & elect to pump crude. 04:00 - 04:45 0.75 DRILL P PROD1 RBIH to drill w/waiting on crude. Tag @ 11,760' & orient to 90R. Printed: 8/21/2001 3:59:07 PM BP EXPLORATION Page 3 of 6 Operations Summary Report Legal Well Name: Y-14 Common Well Name: Y-14B Spud Date: 9/20/1988 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/7/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/7/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 8/2/2001 04:45 - 05:40 0.92 DRILL P PROD1 Drill ahead to 11,781', TF flopped after hard stall, crude on location. 05:40 - 06:45 1.08 DRILL N STUC PROD1 Pull up to shoe & pump 12 bbls crude. W/5 bbls crude out @ bit, attempt to pull slowly thru shoe, several attempts made w/ max pull of 60K, unable to get coil connector past shoe. Appears to be keyseated or lip folded over @ shoe. Call for acid. (aluminum shoe) 06:45 - 09:30 2.75 DRILL N STUC PROD1 Wait on acid. Discuss upcoming job w/crew & prep for same. 09:30 - 10:30 1.00 DRILL N STUC PROD1 Rig up Dowell to pump acid. 10:30 - 11:00 0.50 DRILL N STUC PROD1 Pre Job on pumping acid. Emphasis on letting Dowell hands w/ proper PPE attend to pumping operation & monitoring of surface lines. All concerns addressed, wind direction noted, neutralization tank prepped ahead of time, good communication stressed throughout job. 11:00 - 12:30 1.50 DRILL N STUC PROD1 Pump 10 bbls KCL, PT lines to 4000 psi, OK. Pump 11.5 bbls 15% HCL acid, 10 bbls KCL & displace w/FIo Pro. With bit @ 11,380', pump 4 bbls out & shut down, let soak 15 minutes. Pull up once slowly to 60K, (25K over), no good. Slack off & free, pump I bbl & let soak 5 minutes. Pull up slowly w/pump off, normal up weight, 37-38K, & pull thru shoe w/BHA, no bobbles. Clear BHA of acid & spacer. 12:30 - 16:00 3.50 DRILL N DPRB PROD1 'POOH, take spacers & spent acid to neutraliztion tank. 16:00 - 17:00 1.00 DRILL N DPRB PROD1 .LID BHA. 17:00 - 20:15 3.25 DRILL N DPRB PROD1 Cut 40' off coil, weld on new connector, pull & pressure test :same, OK. Connector that was cut off indicates a keyseat was , the problem. Orienter problem was due to a lug in the output shaft of orienter being broken off. USMPR tool will be sent to town for evaluation. 20:15 - 22:00 1.75 DRILL N DPRB PROD1 :M/U BHA #5, test USMPR, OK. Function test orienter, OK. 22:00 - 00:00 2.00 DRILL N DPRB PROD1 RIH, shallow hole test, OK. 8/3/2001 00:00 - 00:30 0.50 DRILL P PROD1 Continue in hole, correct @ EOP flag, add 3'. 00:30 - 01:30 1.00 DRILL P PROD1 Tie into gamma marker, add 12' correction. 01:30 - 03:45 2.25 DRILL P PROD1 Ream/backream shoe all sides. Few stalls @ 11,307' w/going down, backream same area. RIH 100' & pull up thru shoe, smooth, no motor work. 03:45 - 04:15 0.50 DRILL P PROD1 RIH to TD & let new mud clear bit. 04:15 - 06:30 2.25 DRILL P PROD1 MAD passing f/TD to 11,643'. RBIH & tag @ 11,780'. 06:30 - 07:00 0.50 DRILL P PROD1 Orient to 90R. 07:00 - 08:15 1.25 DRILL P PROD1 Drill ahead f/11,780'-11,860'. TF 80-95R, 2.5 bpm @ 2850 freespin, 350-450 dp on motor. 1-3K WOB, ROP 75 fph. 08:15 - 08:25 0.17 DRILL P PROD1 Orient to 140R. 08:25 - 08:45 0.33 DRILL P PROD1 Drill ahead to 11,900', ROP 120 fph, TF 110-130R. 08:45 - 09:00 0.25 DRILL P PROD1 Orient to 90L. 09:00 - 09:45 0.75 DRILL P PROD1 Drill ahead to 11,924', ROP 40 fph. Lost 100 psi freespin, unable to drill effectively, suspect bleed sub. 09:45 - 13:00 3.25 DRILL N DFAL PROD1 POOH, no bobbles going thru shoe, flag EOP @ 10,500', monitor well @ 500', well stable. 13:00 - 15:00 2.00 DRILL N DFAL PROD1 OOH, bleed sub nozzle broken off, may have been injured while dressing shoe. CIO bleed sub & orienter, function test orienter, OK. 15:00 - 17:30 2.50 DRILL N DFAL PROD1 RIH, shallow hole test, OK. Tie into EOP flag, subtract 12' correction. 17:30 - 18:45 1.25 DRILL N DFAL PROD1 Tie into gamma marker (+6' correction). Printed: 8/21/2001 3:59:07 PM BP EXPLORATION Page 4 of 6 Operations Summary Report Legal Well Name: Y-14 Common Well Name: Y-14B Spud Date: 9/20/1988 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/7/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/7/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 8/3/2001 18:45 - 19:30 0.75 DRILL N DFAL PROD1 RBIH. Tight spot @ 11820'. Puh thru with pumps off. Continue RIH & tag bottom @ 11920'. 19:30 - 20:45 1.25 DRILL P PROD1 Backream tightspots to 11780' twice. 20:45 - 21:15 0.50 DRILL P PROD1 RBIH & orient TF to 90L. 21:15 - 22:15 1.00 DRILL P PROD1 Drill to 11959' with 2.5bpm / 2950psi freespin / 250psi dp / 90L TF / 3k WOB / 20fph ROP. Observe motor stall. Over-pulled and got a click with pump off. 22:15 - 22:30 0.25 DRILL P PROD1 Reorient to 80-90L. 22:30 - 00:00 1.50 DRILL P PROD1 Drill to 12043' with 2.5bpm / 2950psi freespin / 350psi dp / 80-90L TF / 3k WOB / 56fph ROP. 8/4/2001 00:00 - 00:30 0.50 DRILL P PROD1 Drill to 12064' with 2.5bpm / 2950psi freespin / 350psi dp / 70-80L TF / 3k WOB / 63fph ROP. 00:30 - 00:45 0.25 DRILL P PROD1 Orient to 100L. 00:45 - 01:30 0.75 DRILL P PROD1 Drill to 12106' with 2.5bpm / 3100psi freespin / 350psi dp / 95-100L TF / 3k WOB / 56fph ROP. Stacking & stalling. 01:30 - 02:15 0.75 DRILL P PROD1 Wiper trip to shoe. Pull thru shoe with no overpulls. RBIH 02:15 - 02:45 0.50 DRILL P PROD1 Orient to 100L. 02:45 - 03:15 0.50 DRILL P PROD1 Drill to 12141' with 2.5bpm / 3200psi freespin / 250-350psi dp / 90-120L TF / 3k WOB / 71fph ave ROP. 03:15 - 06:00 2.75 DRILL P PROD1 Orient as needed to 90L & drill to 12171' with 2.5bpm / 3200-3380psi freespin / 220-350psi dp / 90-105L TF / 3k WOB / 27fph ave ROP. TF flopping with motor stalls. 06:00 - 07:00 1.00 DRILL N DFAL PROD1 Attempt to orient to 90L, orienter not cycling. 07:00 - 07:30 0.50 DRILL N STUC PROD1 POOH f/orienter & USMPR tool, stuck w/pulling thru shoe, pull 15K over up wt., unable to move pipe up or down. Appears to be stuck @ coil connector. 07:30 - 08:00 0.50 DRILL N STUC PROD1 Work pipe, unable to free up or down. 08:00 - 11:15 3.25 DRILL N STUC PROD1 Call f/15 bbls 15% HCL, prep to pump acid. 11:15 - 12:30 1.25 DRILL N STUC PROD1 Rig up pumper. 12:30 - 13:00 0.50 DRILL N STUC PROD1 Pre job on pumping acid. Emphasis on good communication, preparation of neutralization fluid ahead of time & stressing that Dowell hands w/proper PPE to oversee pumping & line monitoring until acid is downhole. 13:00 - 16:50 3.83 DRILL N STUC PROD1 Pump 25 bbls KCL followed by 16 bbls 15% HCL & chase w/ 25 bbls KCL. Dispalce w/FIo Pro. With 3-4 bbls acid out @ bit & slacked offto 12K, (24K dn wt), shut down & wait 10 minutes, pump 1.5 bbls more & wait. After 5 minutes see 3-4K increase in weight. Set down to 10K & pump 1 bbl. wait 10 minutes & P/to 50K & slack off to 5K, no movement. Continue in this fashion until all acid is out @ bit & 70 minutes has passed. No movement. Circulate spent acid & KCL out to opentop & neutralize. 16:50 - 18:00 1.17 DRILL N STUC PROD1 Call for additonal 20 bbls 15% HCL acid. 18:00 - 18:30 0.50 DRILL N STUC PROD1 PJSM. Review acid job and safety concerns. 18:30 - 21:00 2.50 DRILL N STUC PROD1 Pump 15 bbls KCL ahead, 20 bbls 15% HCL acid, 15 bbls KCL behind & displace to shoe w/FIo Pro. Spot 6 bbls acid around shoe with all wt slacked off. Soak acid for 20 mins. Pump 10 bbls more with 5bbls returns. Work pipe 5 times between 69k up & -2.5k dn wt. No movement. Spot remaining 4 bbls acid around shoe & soak for 20 rains. No success. Circulate spent acid & KCL out & neutralize same. 21:00 - 23:45 2.75 DRILL N STUC PROD1 Call for additonal 25 bbls 28% HCL acid. 23:45 - 00:00 0.25 DRILL N STUC PROD1 PJSM. Review acid job and safety concerns. Printed: 8/21/2001 3:59:07 PM BP EXPLORATION Page 5 of 6 Operations Summa Report Legal Well Name: Y-14 Common Well Name: Y-14B Spud Date: 9/20/1988 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/7/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/7/2001 Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 8/5/2001 00:00 - 03:00 3.00 DRILL N STUC PROD1 Pump 25 bbls KCL ahead, 25 bbls 28% HCL acid, 25 bbls KCL behind & displace to shoe wi FIo Pro. Spot 10 bbls acid around shoe with string wt slacked off. Soak acid for 30 mins. Pump 7 bbls more & work pipe twice between 63k up & -2.5k dn wt. No movement. Spot remaining acid around shoe & worked pipe to 65k up. No success. Work pipe to 70k up & observed free downward movement. P/U to 46k & worked down free again. P/U to 40k & gradually drag pipe free. Pull bit into shoe. 03:00 - 07:30 4.50 DRILL P PROD1 POOH BHA#6 displacing KCL & HCI acid to tiger tank. Neutralize same. Flag EOP. POOH & monitor well @ 500', well stable. 07:30 - 09:00 1.50 DRILL P PROD1 OOH. Observe junk marks & scratches @ +/- 300' from CTC. RB injector. Download MPR data & L/D BHA. BHA looks pitted due to acidisation. GR probe - OK. However, USMPR not OK, will be sent to town for evaluation. 09:00 - 12:30 3.50 DRILL P PROD1 Rig up to & cut 334' off coil, weld on connector, pull & pressure test same, OK. 12:30 - 13:45 1.25 DRILL P PROD1 M/U BHA # 7 to clean up shoe area. 13:45 - 16:15 2.50 DRILL P PROD1 RIH, shallow hole test, OK. Add 8' correction @ EOP flag. 16:15 - 17:00 0.75 DRILL 'N DFAL PROD1 Attempt to tie in w/gamma, gamma tool failed in MWD. Too ; risky to dress shoe w/o gamma tie in after cutting 350' off coil. 17:00 - 20:30 3.50 DRILL iN DFAL PROD1 POOH to c/o gamma probe. Monitor well @ 500' - OK. 20:30- 22:30 2.00 DRILL :N DFAL PROD1 OOH. Observe power connection problem with MWD. :Changeout MWD probe and M/U BHA#8. 22:30 - 00:00 1.50 DRILL !N DFAL PROD1 RIH with BHA#8. SHT MWD & Orienter. OK. Continue RIH. 8/6/2001 00:00 - 00:35 0.58 DRILL N DFAL PROD1 RIH with BHA#8. Tie into EOP flag (+5 correction). Continue RIH. 00:35 - 02:10 1.58 DRILL N DPRB PROD1 Log GR tie-in (+6 correction). Continue RIH to shoe. 02:10-06:15 4.08 DRILL N DPRB PROD1 Ream window from 11290'to 11310'. P/U. Overpulledwith motor work & stalled out. P/U & ream/backream shoe from 11290' to 11310' @ various TFs. 06:15-07:30 1.25 DRILL N DPRB PROD1 Overpulling w/pulling up f/11,270', 5-7K. Pull upto 10,300', (above slotted liner). RBIH, OK. 07:30 - 08:00 0.50 DRILL N DPRB PROD1 Work down to 11,340', no problems, POOH to 11,270', no drag. 08:00 - 12:15 4.25 DRILL N DPRB PROD1 PROGRAM CHANGED TO SUSPEND WELL AS BAREFOOT COMPLETION AND MOVE TO Y~26A. Displace well to KCL w/ POOH.~rop 3/4" ball to open circ sub, & chase with 60/40 meth/water. Ball failed to seat w/meth at bit, freeze protect top 2000' of hole. 12:15 - 13:00 0.75 DRILL N DPRB PROD1 L/D BHA #8, did not find 3/4" ball in check valves. 13:00 - 16:00 3.00 DRILL N DPRB PROD1 Valve shop boys doing job on S pad, call f/more KCL & wait. Ship 278 bbls NEW mud & 300 bbls slightly used mud to MI f/ use on next well. 16:00 - 16:30 0.50 DRILL N DPRB PROD1 KCL here, launch dart & pump around. Dart around @ 58.4 bbls. 16:30 - 18:30 2.00 RIGD P COMP R/U DSM lubricator. Set BPV. PJD lubricator. Close master valve. 18:30 - 19:30 1.00 RIGD P COMP Install snubbing table and drilling riser. PJSM. RB injector, M/U "nozzle/stinger & stab onto well. 19:30 - 21:00 1.50 RIGD P COMP Suck out pits & tanks. Blow down mud lines. Meanwhile W.O nitrogen. 21:00 - 23:00 2.00 RIGD P COMP PJSM, R/U nitrogen truck. PT lines to 2000psi - OK. Purge coil. Blow down kill & orientor lines. Printed: 8/21/2001 3:59:07 PM BP EXPLORATION Page 6 of 6 Operations Summary Report Legal Well Name: Y-14 Common Well Name: Y-14B Spud Date: 9/20/1988 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/7/2001 Contractor Name: NABORS TRANSOCEAN Rig Release: 8/7/2001 ~Rig Name: CDR-1 Rig Number: 1 Date From - To Hours Activity Code NPT Phase Description of Operations 8/6/2001 23:00 - 23:30 0.50 RIGD P COMP RB injector & L/D nozzle/stinger. Prep coil for L/D. 23:30 - 00:00 0.50 RIGD P COMP Suck out pits & tanks. Printed: 8/21/2001 3:59:07 PM BP Amoco Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Fiekh Prudhoe Bay Site: PB Y Pad Well: Y-14 Wellpnth: Y-14B ., Date: 916/2001 Time: 16:35:30 Page: 1 Ce-or4tante(NE) Reference: Well: Y-14, True North Vertical (T~q)) Reference: 21 · 14 6/6/1996 15:50 85.0 Section CVS) Reference: Well (0.00N,0.00E,220.00Azi) Snr~ey Cnlcnlnflon Method: Minimum Curvature Db: Oracle Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Gee Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: BGGM2001 Site: PB Y Pad TR-11-13 UNITED STATES: North Slope Site Position: Northlng: From: Map Easting: Position Uncertainty: 0,00 ft Ground Level: 0,00 ft 5948541.48 ft Latitude: 70 16 0.041 N 647748.73 ff Longitude: 148 48 18.991 W North Reference: True Grid Convergence: 1.12 deg Well: Y-14 Slot Name: 14 Y-14 Well Positton: +N/-S 1279.45 ft Northing: 5949777.00 ff Latitude: 70 16 12.621 N +El-W-2221.21 ft Easting: 645503.00 ff Longitude: 148 49 23.652 W Position Uncertainty: 0.00 ft Wellpath: Y-14B Drilled From: Y-14A 500292183202 ..Tie-on Depth: 11291.00 ft Current Datum: 21: 14 6/6/1996 15:50 Height 85.00 ff Above System Datum: Mean Sea Level Magnetic Data: 7/17/2001 Declination: 26.54 deg Field Strength: 57486 nT Mag Dip Angle: 80.76 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ff ff ff deg 0.00 0.00 0.00 220.00 Survey: MWD Start Date: 8/4/2001 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Annotation 11291.00 8999.76 KO P 12171,00 9037.94 TD Survey MD" ':InCl' ' Azim ' :'~ SSTVD: N/S ',E/W 'MaPN MOpE , DLS VS ft,'" deg , deg 'fa' ', ff ' '~,'ff:, ~,ft' fi: degll00ff ft 11291.00 89.08 206,63 8999.76 8914.76 -4464.76 -1421.78 5945265.93 644168.29 0.00 4349.43 11345.00 95.50 216,40 8997,60 8912.60 -4530.69 -1449.93 5945219.47 644141.04 21.63 4402.70 11377.00 98.70 224.50 8993.63 8908.63 -4554.83 -1470.50 5945194.94 644120.94 27.03 4434.43 11404.00 93.20 227.60 8990.84 8905.64 -4573.46 -1489.83 5945175.94 644101.98 23.35 , 4461.12 11443.00 89.50 235,40 8989.92 8904.92 -4597.71 -1520.31 5945151.11 644071.97 22.13 4499.29 11469.00 89.50 241.00 8990.14 8905.14 -4611.40 -1542.40 5945136.99 644050.15 21.54 4523.97 11505.00 91.50 249.10 8989,83 8904.83 -4626.57 -1575.01 5945121.20 644017.84 23.17 4556.56 11538.00 90.10 247,70 8989,37 8904.37 -4638.72 -1605,69 5945108.46 643987.41 6.00 4585.58 11575.00 85.50 243.10 8990,79 8905.79 -4654.10 -1639,29 5945092.43 643954.11 17,57 4618.96 11620.00 84.20 237.10 8994.83 8909.83 -4676.43 -1678.12 5945069.36 643915.72 13,59 4661,03 11652.00 85.70 231.50 8997.65 8912.65 -4695.02 -1704.00 5945050.27 643890.21 18.05 4691.91 11711.00 86.60 236.00 9001.61 8916.61 -4729,82 -1751.46 5945014.56 643843.44 7.76 4749.07 11737.00 84.90 241.70 9003.54 8918,54 -4743.23 -1773.64 5945000.73 643821.52 22.82 4773.60 11785.00 86.00 245.60 9007.35 8922.35 -4764.46 -1816.51 5944978.68 643779.07 8.42 4817.42 11813.00 86.10 249.40 9009.28 8924.28 -4775.15 -1842.31 5944967.49 643753,49 13.54 4842,19 11884.00 85.10 258.20 9014.74 8929.74 -4794.88 -1910.22 5944946.45 643685,97 12.44 4900 96 11967.00 83.90 251.50 9022.70 8937,70 -4816.46 -1989.92 5944923.34 643606.71 8.16 4968,72 12017.00 85.60 247.70 9027.28 8942,28 -4833.81 -2036.58 5944905.09 643560,40 8.30' 5012,00 BP Amoco Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 916/2001 Time: 16:35:30 Page: 2 FieM: Prudhoe Bay Co~rdlaate(Nli:) Reference: Well: Y-14, True North Site: PB Y Pad Vertical (TVD) Reference: 21: 14 6/6/1996 15:50 85.0 Well: Y-14 Scetioa (VS) Refereace: Well (0.00N,0.00E,220.00Azi) Wellpath: Y-14B Sarvey Calcalatloa Method: Minimum Curvature Db: Oracle Survey MD IBc! Azim ~ SSTVg N/S E/W MapN MapE DLS VS ff deg deg ff ff ff ff ff ff deg/100tt ff 12091.00 86.40 239.20 9032.45 8947.45 -4866.78 -2102.55 5944870.86 643495.09 11.51 5079.66 12117.00 86.00 235.70 9034.17 8949.17 -4880.73 -2124.41 5944856.48 643473.50 13.52 5104.40 12171.00 86.00 235.70 9037.94 8952.94 -4911.09 -2168.91 5944825.27 643429.60 0.00 5156.26 Amoco RI: FERENCE INFORMATION CO ordinate ~N/E Refereoce Wel~Centre Y-14 True North Ve d,ca~ ~FVD ) Rele re rice System Mean Sea Leve~ Secbon NS~ Reference Slol - 14 0 00N 0 00E Measured DeDth Reference 21 146/6/19961550 8500 Calculation Me~hod M~mmum Curvalure 8400 Y~,~.~P~r,~: /~ M UagneUcNorth 2654" 4600 : ~o0o ]. i ';; ']' West(-)/East(+) [100ft/in] 435O 44OO 4450 4500 4550 4600 465O 47O0 475O 4800 485O 490O 4950 5000 5050 5100 5150 5200 525O 5300 5350 540O 545O 5500 555O 56OO 5650 5700 5750 58O0 5850 590O 59~0 6000 6O5O 6100 6150 62OO 625£ ~5/2001 4:34 P~ ALASI~ OIL AND GAS CONSERVA~FION TONY KNOWLES, GOVERNOR 333 W. 'P" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Alistair Sherwood CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage AK 99519-99519 Re: Prudhoe Bay Unit Y- 14B BP Exploration (Alaska) Inc. Permit No: 201-101 Sur Loc: 492' SNL, 706' EWL, SEC. 34, T11N, R13E, UM Btmhole Loc. 1096' SNL, 1924' .WEL, SEC. 04, T10N, R13E, UM Dear Mr. Sherwood: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention, equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Daniel T. Seamount, Jr. Commissioner BY ORDER OF THE COMMISSION DATED this ~"5' day of May, 2001 jjc/Enclosures .CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA~r C AND GAS CONSERVATION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Ddll [] Redrill 11 b. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen [] Service [] Development Gas [] Single Zone [] Multiple Zone I 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 85' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047471 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 492' SNL, 706' EWL, SEC. 34, T11N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 4291' SNL, 362' WEL, SEC. 33, T11N, R13E, UM Y-14B Number 2S100302630-277 At total depth 9. Approximate spud date 1096' SNL, 1924' WEL, SEC. 04, T10N, R13E, UM 06/11/01 Amount $200,000.00 12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028287, 1096' MDI No Close Approach 2560 13280' MD / 9040' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 11300' MD Maximum Hole Angle 96 o Maximum surface 2594 psig, At total depth (TVD) 8800' / 3650 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4" 2-7/8" 6.16# L-80 ST-L 2320' 10960' 8911' 13280' 9040' Uncemented Slotted Liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. B,~ Present well condition summary Total depth: measured 11300 feet Plugs (measured) true vertical 9000 feet '.. ~.'--.~ ~' Effective depth: measured 11300 feet Junk (measured) true vertical 9000 feet ?i..t~st.(a 0ii,.x Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 8 cu yds Concrete 110' 110' Surface 2686' 13-3/8" 3723 cuft Arcticset II & III 2686' 2686' Intermediate Production 6991' 9-5/8" 2116 cuft Class 'G' 9416' 8320' Liner 1298' 7" 298 cuft Class 'G' 9243' - 10541' 8181' - 8979' Liner 902' 4-1/2" Uncemented Slotted Liner 10398' - 11300' 8964' - 9000' Perforation depth: measured 10168' - 10198' Slotted Liner: 10532'-10614', 10649'-10769', 10868'-11154', 11156'-11276' true vertical 8878' - 8895' Slotted Liner: 8979' - 8986', 8987' - 8985', 8987' - 8997', 8997' - 9000' 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program [] Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Alistair Sherwood, 564-4378 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the fore~oj,'ng js true art~t correct to,~e best of my knowledge _ Signed Alistair Sherwood '~~;~.~'~. U~'O~'~'~"(, Title CT Drilling Engineer Date :'.: .:;"; :.' ,:.'.%' : :.~' .' .'::..:".: :.' .' '::.~': ~':.:,i'.':',' .,!' ,: :' ::...~.: ....,::::,: ::'.: ~::i .: '::.... .... .: ~:..:.,,...u..:..:'.;~;'i: ':?..'?, ..c~m:missiOn ::u:se;.OnlY ~:; ':.,,: .~!'.' ':,:.:, ..!:';.i, ::. :: ,ih: !.!::::,.,. ,.": .'..:,.::: !~. ~J', %, ..~.; "Permit NUmber" .... 'I"~API Number ....... ,, ,, ,,i . .... "' '" "1" '""' "' A'l:)Prov~ D.a~ '~., I I S~e"~ov'er lette~' "' ' _ .zo,,-/'o/ 150-029-21832-02 I ~ '"('J'~ ,"7' LJ / I f°r other requirements Conditions of Approval: Samples Required [] Yes [] No Mud Log Required [] Yes J~ No Hydrogen Sulfide Measures [] Yes [] No Directional Survey Required '~ Yes [] No Required Working Pressure for ROPE [] 2K [] 3K [] 4K [] 5K [] 10K [] 15K .~ 3.5K psi for CTU Other: ORIGINAL SIGNED BY by order of _Approved By D Taylor Seamg~lllt Commissioner the commission Date ~-'~ ~"~ ,""~ 0 I Form 10-401 Rev. 12-01-85 ORIGINAL Submit In Triplicate BPX Y-14B CTD Extension Summary of Operations: Y-14A is currently producing 570 blpd with a 36% watercut. Y-14B will extend the wellbore 2000' south, crosscutting Zone 4 to access waterflood reserves in 2 separate fAu~t blocks. When dTilled Y-14B will be completed with a 2.7/8" perforated liner tied back into the 4.1/2" perforated liner. The well operations are detailed below. Drill and Complete extension: Planned for June11,2001 2.3/8" coil tubing will be used to drill and complete the directional hole as per attached plan. The 3.3/4" hole will be completed with a 2.7/8" perforated liner, the top of which will be set in the 4.1/2" perforated liner at approx. 10,960' MD. Mud Program: · FIo-Pro (8.6- 8.7 ppg) Disposal: · No annular injection on this well. · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 2320' of 2.7/8", 6.4#, L-80, ST-L perforated liner from TD to 10,960' MD Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2000 psi. Directional · See attached directional plan · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · A MWD Gamma Ray log will be run over the entire open hole section. · A real time resistivity or memory induction log will be run in the lateral section. Hazards ~ The concentratior¥0-f H2s is 20 ppm.~_-er0r faults will be crossed by the wellpath. Each has a less to moderate lost circb~tion pote~#1 has the greatest lost circulation potential due to it's NE-SE orientation and the hi~Jh-colTEuctance of faults in this direction. Reservoir Pressure Res. press, is estimated to be 3650 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 2594 psi. Y-14B CTD Sidetrack Hazards Pre-job HAZOP's and Safety meetings are recommended when there is a clear change in workscope. If at any time things don't feel or look right, stop the job and discuss the situation before making the next move. SAFETY FIRST. · 3650 psi @ 8800' TVDss is the BHP prognosis - equivalent to a 8ppg fluid. · 2595 psi is the maximum WHP possible assuming a full column of 0.12 psi/ft gas. The wellpath crosses 4 faults each with a less than moderate Iow circulation loss potential. Good drilling practices & Iow ECD's should be used to manage losses. · Pressure along the wellpath is predicted to be constant. · H2S content is 20 ppm. · Flammable Fluid Properties Fluid Flashpoint Vapor Pressure _< 1.5 psi Reed Vapour Press - Down Coil Crude Variable < 2.0 psi Reed Vapour Press - Down Backside Diesel 100 deg F 0.1 psia @ 100 deg F MeOH 55 deg F 1.8 psia @ 68 deg F TREE = CIW WELLHEAD= MCEVOY ACTUATOR~ AX~soN KB'.. ELD '~ 79.8' E~i~i 'E~ ': 50.6' '~6i~'~ 4000' '~"'~,';~'i~"; ........ ~i~'~'~'6~'~'~~' Datum MD = 10178 ,,, Datum ~s= 8800' I 13-3/8" CSG, 72#, L-80, ID = 12.347" Y-14A 2686' ~ I SAFI~'" ~OTES: 2192' 1'-'14-1/2" OTIS SSSV NIP, ID = 3.813" GAS LIFT MANDRELS Minimum ID = 3.0 @ 1 1154' TIW NO-GO SUB TOPOF 7" LNR I~ 9243' I 9-5/8" CSG, 47#, L-80, ID = 8.681" I'"~ 9416' TOP OF 7" LNR ]"'1 9807' 9-5/8" CSG, 47#, L-80, ID: 8.681" I""l 10052' PERFORATION SUMMARY REF LOG: EWR4/GR (MVVD) 10/27/95 ANGLEATTOP PERF: 53 @ 10168' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 10168' -10198' O 03/15/96 3-3/8" 6 10532' -11276' O 11/01/95 I 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" I--'[ 10487' I MILLOUT WINDOW- 9413' - 9466' I 10025' 10036' J_14-1/2" HES 'X' NIP, ID= 3.813" J I_..I 7" x 4-1/2" BKR S-3 PKR, ID = 3.875"I 10059' 10081' IJ 4-1/2" HES 'X' NIP, ID= 3.813" IJ4-1/2" HES 'XN' NIP, ID= 3.725" 10093' 1~4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID = 3.958" 10093' 1~4-1/2" WLEG, ID = 3.958"I I oo s' I-I I 10398' I--14-1/2" LNR, 26#, .0152 bpf, ID= 3.958" 10398' I-~ 4" TlVV SS HORIZ. F'KR, ID = 3.923" 10541 % % " ', I 0620' I--I ~~ I ',-----I 11300' 7" CSG, 29#, L-80, ID = 6.182" TIVV 4.5" MLAS, ID -- 3.881" 7" BAKER 20' ECP PKR, ID = 3.98" I-'ITIW NOGO SUB, I ID = 3.0" I DOG OF ESP INFLATION TOOL I'"'l 4-1/2" SLOTTEDLNR, 12.6#, L-80, ID= 3.833" DATE REV BY COMMENTS DATE REV BY COMMENTS 10/07/88 QUES. ORIGINAL COMPLETION 11/01/95 LINDER SIDETRACK COMPLETION 03/04/01 SIS-QAA CONVERTEDTO CANVAS 03/12/01 SIS-MD FINAL 04/22/01 RN/TP CORRECTIONS FRUDHOE BAY uNrr WELL: Y-14A PERMIT No: 95-1470 APl No: 50-029-21832-01 Sec. 34, T11 N, R13E BP Exploration (Alas ka) TREE = CIVV WELLHEAD=- MCEVOY ACTUATOR-- AXELSON '~'IE~"~'~'''[ ........................................... 50.6' i~bi~"~ ....................................................................... 4ooo' Datum MD = 10178 Datum TVDss= 8800' IMinimum ID = 3.0 @ 11154' T~V NO-GO SUB I Y-14B I SAFLEX"' 'OTES: 2192' 1~4-1/2" OTIS SSSV NIP, ID = 3.813" I GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH I SIZE 6 3002 2916 0 CAM MMG RK 1.5" 5 5096 4926 38 CAM MMG RK 1.5" 4 6714 6190 39 CAM MMG RK 1.5" 3 8319 7381 41 CAM MMG RK 1.5" 2 9012 7915 39 CAM MMG RK 1.5" 1 9166 8036 36 CAM MMG RK 1.5" 9-5/8"CS~ 47#, L-80, ID=8.681" I MILLOUT WINDOW - 9413' - 9466' I 10025' 10036' 1_14-1/2'' HES 'X' NIP, ID= 3.813"I 1_17,, x 4-1/2" BKR S-3 PKR, ID= 3.875.I 10059' 10081' 1_14-1/2,, HES 'X' NIP, ID= 3.813.I 1._14-1/2,, HES 'XN' NIP, ID-- 3.725" i PERFORATION SUMMARY REF LOG: EWR4/GR (MWD) 10/27/95 ANGLEATTOP PERF: 53 @ 10168' Note: Refer to Production DB for historical perf data I SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8' 6 10168' -10198' O 03/15/96 3-3/8' 6 10532'-11276' O 11/01/95 9-5/8" CSG, 47#, L-80, ID = 8.681.I 10052' I 7" CSG, 26#, L-80, ID = 6.276" 110487' I 10093' 1_~4-1/2" TBG, 12.6#, L-80, 0.0152 bpf, ID= 3.958"I % % % · 10093' 1~4-1/2" WLEG, ID = 3.958"I I ~oo~' I-I ~D-~O~G~,~,9~ I 10398' 1-14-1/2" LNR, 26#, .0152 bpf, ID= 3.958"I 10398' I--I 4, TIW ss HORIZ. PKR, ID = 3.923"I 7" CSG, 29#, L-80, ID= 6.182"I 10620' TIVV4.5" MLAS. ID = 3.881" I ~,1°81i' i-1 7"BAKER20'ECPPKR,iD = 3.98" DATE REV BY COMMENTS DATE REV BY COMMENTS 10/07/88 QUES. ORIGINAL COMPLETION 05/08/01 AS CTD Toe Out Drill Extension 11/01/95 LINDER SIDETRACK COMPLETION 03/04/01 SIS-QAA .CONVERTED TO CANVAS 03/12/01 SIS-MD FINAL 04/22/01 RN/TP CORRECTIONS PRUDHOE BAY UNFF WELL: Y-14A PERMrr No: 95-1470 APl No: 50-029-21832-01 Sec. 34, T11 N, R13E BP Exploration (Alaska) BP Amoco Planning Report- Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y-14 Wellpath: Y-14.~ t Date: 5/18/2001 Time: 11:02:34 Co-ordinate(NE) Reference: Well: Y-14, True North Vertical (TVD) Reference: 21: 14 6/6/1996 15:50 85.0 Section (VS) Reference: Well (0.00N,0.00E,204.00Azi) Plan: Plan #1 b Page: Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Ceo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: Bggm99 Site: PB Y Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5948541.48 647748.73 Latitude: 70 16 0.041 N Longitude: 148 48 18.991 W North Reference: True Grid Convergence: 1.12 deg Well: Y-14 Y-14 Surface Position: +N/-S 1279.45 ft +E/-W -2221.21 ft Position Uncertainty: 0.00 ft Reference Point: +N/-S 1279.45 ft +E/-W-2221.21 ft Northing: 5949777.00 ft Easting: 645503.00 ft Northing: 5949777.00 ft Easting: 645503.00 ft Measured Depth: 36.00 ft Vertical Depth: 36.00 ft Slot Name: 14 Latitude: 70 16 12,621 N Longitude: 148 49 23.652 W Latitude: 70 16 12.621 N Longitude: 148 49 23.652 W Inclination: 0.00 deg Azimuth: 0.00 deg Wellpath: Y-14AL1 Drilled From: Y-14A OTD Toe drill out Tie-on Depth: 11300.00 ft Current Datum: 21: 14 6/6/1996 15:50 Height 85.00 ft Above System Datum: Mean Sea Level Magnetic Data: 4/9/2001 Declination: 26.73 deg Field Strength: 57342 nT Mag Dip Angle: 80.68 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ff ft deg 0.00 0.00 0.00 204.00 Plan: Plan #1 b Date Composed: 4/23/2001 13280'md as td Version: 1 Principal: Yes Tied-to: From: Definitive Path Plan Section Information .. MD' .. Incl ..' · 'Azim ....... "TVD ::::'..'+N/~S:. . +E]~W '." DLS '" Build. · Turn ...'TFO; . Target:' .. ...' ft ..... .deg:..:.' deg .. .. fl:i:' ' : ' ft.' ft......deg/lOOftdeg/lO'Oftdeg/lOOft' ..deg.. . . 11245.77 89.08 206.63 8999.03 -4444.34 -1401.51 0.00 0.00 0.00 0.00 11300.00 89.08 206.63 8999.90 -4492.81 -1425.81 0.00 0.00 0.00 0.00 11520.00 96.26 250.12 8989.14 -4635.39 -1585.88 20.00 3.26 19.77 80.00 11720.00 78.93 240.08 8997.51 -4718.99 -1766.26 10.00 -8.66 -5.02 -150.00 11910.00 85.86 257.95 9022.84 -4785.89 -1941.34 10.00 3.65 9.40 70.00 12610.00 88.58 187.90 9061.72 -5266.72 -2387.77 10.00 0.39 -10.01 -90.00 12910.00 94.73 217.29 9052.84 -5540.46 -2501.55 10.00 2.05 9.80 78.00 13280.00 88.99 180.70 9040.38 -5884.13 -2619.64 10.00 -1.55 -9.89 -98.00 Section 1 : Start Hold .'.MD:: . Inci :"Azim TVD "+N/-S '::'+Eff-W' .' VS. ' : 'DLS.. BUild.. 'Turn 'TFO · ff. · 'deg 'deg .... .:. ff' .ff ff' .. ff . . deg/iooff deg/lOOff'deg/iOoff deg. '11245,77 89,08 206,63 8999.03 -4444,34 -1401,51 4630.16 0,00 0,00 0.00 '0,00 111300,00 89,08 206,63 8999,90 -4492,81 -1425,81 4684,32 0,00 0,00 0,00 0,00 Section 2: Sta~ DLS 20,00 TFO 80,00 .iMD'' Incl.. Azim :' .TVD +N/-S' '+E/,W VS ..... DLS ' .BUild Turn'.... TFO- ff · · 'deg. ' · .deg:'" :'"'ff ':'"ff "ff ='' .ff' .. deg/i00ffdeg/100ffdeg/1.00ff deg 11325,00 89,95 211,55 9000,11 -4514,65 -1437,96 4709,21 20,00 3,48 19,70 80,00 11350.00 90.82 216.48 8999,94 -4535,36 -1451.94 4733.82 20.00 3,48 19,69 79,96 11375.00 91.69 221,40 8999,40 -4554,80 -1467,65 4757,97 20,00 3,46 19,70 79,99 11400,00 92,54 226,33 8998,48 -4572,80 -1484,96 4781,45 20,00 3,41 19,72 80,10 11425,00 93,37 231,27 8997,19 -4589,24 -1503,74 4804,11 20,00 3,33 19,75 80,28 BP Amoco Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y-14 Wellpath: Y-14.~ Date: 5/18/2001 Time: 11:02:34 Co-ordinate(NE) Reference: Well: Y-14, True North Vertical (TVD) Reference: 21: 14 6/6/1996 15:50 85.0 Section (VS) Reference: Well (0.00N,0.00E,204.00Azi) Plan: Plan #lb Page: Section 2: Start DLS 20.00 TFO 80.00 MD Incl Azim TVD +N/-S +F_ff-W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg 11450.00 94.18 236.22 8995.54 -4603.99 -1523.84 4825.76 20.00 3.23 19.78 80.54 11475.00 94.96 241.17 8993.54 -4616.94 -1545.13 4846.25 20.00 3.11 19.82 80.86 11500.00 95.70 246.14 8991.22 -4627.98 -1567.43 4865.41 20.00 2.96 19.87 81.26 11520.00 96.26 250.12 8989.14 -4635.39 -1585.88 4879.68 20.00 2.81 19.91 81.72 Section 3: Start DLS 10.00 TFO -150.00 MD : Incl :Azim TVD +N/-S +E/'W VS DLS Build Turn TFO ft :~ deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft: deg 11550,00 93,66 248,62 8986,54 -4645,92 -1613.85 4900,68 10.00 -8,67 -5.01 -150,00 11600,00 89,32 246,13 8985,24 -4665,15 -1659,97 4937,00 10,00 -8,68 -4,98 -150,13 11650,00 84,99 243,64 8987,72 -4686,34 -1705,17 4974,74 10,00 -8,67 -4,98 -150.19 11700,00 80,66 241.11 8993,97 -4709,33 -1749,11 5013,62 10,00 -8,65 -5,05 -150,07 11720,00 78,93 240,08 8997,51 -4718,99 -1766,26 5029.42 10,00 -8.63 -5.13 -149,76 Section 4: Start DLS ..... MD. :Incl · ff . .deg '11750.00 79.97 11800.00 81.76 11850.00 83.60 111900.00 85.48 [11910.00 85.86 10.00 TFO 70.00 Azim' · TVD deg. . ft · +N/,S +~,w .. vs .ff. ff .: ff DLs BUild Turn TFo deg/100ff.deg/100ft deg/100ft . deg. 242,95 9003,00 -4733,05 -1792,18 5052,81 10,00 3,46 9,54 70,00 247.68 9010.95 -4753.66 -1837,02 5089,87 10,00 3,57 9,46 69,48 252,36 9017,32 -4770,60 -1883,61 5124,29 10,00 3,68 9.38 68.72 257,02 9022,08 -4783,73 -1931,61 5155,81 10,00 3,76 9,31 68,13 257,95 9022,84 -4785,89 -1941,34 5161,75 10,00 3,80 9,28 67,68 Section 5: Start DLS 10.00 TFO -90.00 · MD Incl '.Azim ... TVD +N/-S +E/-w :' VS .. DLS. ' ...Build Turn TFO : · '.fi: i.' 'deg. de.g . .. ff' f. ... ft ft.'. deg/!OOft.~deg/lOOft'deg/lOOft . deg' ...... 11950,00 85.87 253,94 9025,72 -4795,58 -1980,03 5186,34 10,00 0,03 -10,03 -90,00 12000,00 85,91 248.92 9029,31 -4811,46 -2027,29 5220,06 10,00 0.08 -10,03 -89,71 12050,00 85,98 243,91 9032,85 -4831,41 -2072,99 5256,87 10,00 0,14 -10,02 -89,35 12100,00 86,09 238.90 9036.31 -4855.27 -2116,77 5296.48 10,00 0.21 -10.02 -89.00 12150,00 86,22 233,89 9039,67 -4882,87 -2158.31 5338,59 10,00 0,27 -10,02 -88,65 12200,00 86,38 228,88 9042,90 -4914,00 -2197,28 5382,88 10,00 0,32 -10,02 -88,31 12250,00 86.57 223,88 9045,97 -4948,42 -2233,40 5429,01 10,00 0,38 -10,01 -87,99 12300,00 86,78 218,87 9048,88 -4985.86 -2266.38 5476.63 10.00 0,43 -10.01 -87.68 12350,00 87,02 213.87 9051,58 -5026,05 -2295,98 5525,39 10,00 0,48 -10,00 -87,39 12400,00 87,28 208,87 9054,06 -5068,68 -2321,97 5574,89 10,00 0,52 -10,00 -87,12 12450,00 87,57 203,87 9056,31 -5113,41 -2344,15 5624,79 10,00 0,57 -9,99 -86,87 12500,00 87,87 198,88 9058,30 -5159,92 -2362.35 5674,68 10,00 0,60 -9,99 -86,65 12550,00 88,19 193,89 9060,02 -5207,85 -2376,44 5724,19 10,00 0,63 -9,99 -86,45 12600,00 88,52 188,90 9061,46 -5256,83 -2386,31 5772,95 10,00 0,66 -9,98 -86,28 12610,00 88.58 187.90 9061,72 -5266,72 -2387,77 5782,58 10,00 0,68 -9,98 -86,13 Section 6: Start DLS 10.00 TFO 78.00 MD.:. · 'Incl ...Azim '. TVD. ': +N/~S'. '' +E/-w "VS' DLS: Build 'i :Turn TFO , :' :: '.:ft' · '. 'deg · ... deg .. · ft .... · ft .:ft · ft deg/lOOft deg/iooft'deg/lOOft deg.. " ... 12650,00 89,42 191,81 9062,41 -5306,11 -2394,61 5821,35 10,00 2,09 9,78 78,00 12700,00 90,47 196,70 9062,46 -5354,56 -2406,92 5870,62 10,00 2,09 9,78 77,93 12750.00 91.51 201,59 9061,60 -5401.77 -2423,31 5920,41 10,00 2,09 9,78 77,93 12800,00 92,54 206,49 9059,84 -5447.39 -2443,66 5970,37 10.00 2,06 9,79 78.01 12850,00 93,55 211,39 9057,18 -5491,07 -2467,81 6020,09 10.00 2,03 9,81 78,18 12900,00 94,54 216,30 9053,65 -5532,48 -2495,58 6069,22 10,00 1,97 9,83 78,44 12910.00 94,73 217,29 9052,84 -5540,46 -2501,55 6078,94 10.00 1,94 9,84 78,79 Section 7: Start DLS 10,00 TFO -98,00 MD :.. Incl · AZim .TVD +N/-S' '.+E/~W.. : vS...' 'DLs : Build .. Turn TFO 'ft dee deg.: ff .ft ff : ft .: de'g/lOOft deg/iOOft deg/lOOff 'deg · 12950,00 94,17 213,32 9049,73 -5573,00 -2524,59 6118,04 10,00 -1,42 -9,93 -98.00 13000,00 93,43 208,36 9046,42 -5615,83 -2550,16 6167,56 10,00 -1,47 -9,91 -98,31 13050,00 92,67 203,41 9043,76 -5660,73 -2571,95 6217,44 10,00 -1,53 -9,90 -98,64 BP Amoco Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y- 14 Wellpath: Y-14/~, ~ Date: 5/18/2001 Time: 11:02:34 Co-ordinate(NE) Reference: Well: Y-14, True North Vertical (TVD) Reference: 21: 14 6/6/1996 15:50 85.0 Section (VS) Reference: Well (0.00N,0.00E,204.00Azi) Plan: Plan #1 b Page: Section 7: Start DLS 10.00 TFO -98.00 MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg 13100.00 91.88 198.47 9041.77 -5707.38 -2589.80 6267.32 10.00 -1.57 -9.88 -98.90 13150.00 91.09 193.53 9040.47 -5755.41 -2603.57 6316.80 10.00 -1.59 -9.88 -99.10 13200.00 90.28 188.60 9039.87 -5804.46 -2613.16 6365.51 10.00 -1.61 -9.87 -99.22 13250.00 89.48 183.66 9039.98 -5854.16 -2618.50 6413.08 10.00 -1.61 -9.87 -99.28 13280.00 88.99 180.70 9040.38 -5884.13 -2619.64 6440.93 10.00 -1.61 -9.87 -99.27 Survey MaP Map < ....LatitUde--,,> <'.- Longitude .-.> MD InCl Azim : TVD +N/.S +E/,W NOrthing Easting i DegMin Sec Deg Min Sec : :ff deg:: deg fi: ff : ::::ff : :::: : ::: 11245.77 89.08 206.63 8999.03 -4444.34 -1401.51 5945306.74 644187.78 70 15 28.910 N 148 50 4.427 W 11300.00 89.08 206.63 8999.90 -4492.81 -1425.81 5945257.81 644164.41 70 15 28.433 N 148 50 5.134 W 11325.00 89.95 211.55 9000.11 -4514.65 -1437.96 5945235.74 644152.69 70 15 28.218 N 148 50 5.487 W 11350.00 90.82 216.48 8999.94 -4535.36 -1451.94 5945214.76 644139.11 70 15 28.015 N 148 50 5.894 W 11375.00 91.69 221.40 8999.40 -4554.80 -1467.65 5945195.03 644123.79 70 15 27.824 N 148 50 6.351 W 11400.00 92.54 226.33 8998.48 -4572.80 -1484.96 5945176.69 644106.83 70 15 27.646 N 148 50 6.854W 11425.00 93.37 231.27 8997.19 -4589.24 -1503.74 5945159.90 644088.38 70 15 27.485 N 148 50 7.400W 11450.00 94.18 236.22 8995.54 -4603.99 -1523.84 5945144.76 644068.56 70 15 27.340 N 148 50 7.985W 11475.00 94.96 241.17 8993.54 -4616.94 -1545.13 5945131.41 644047.53 70 15 27.212 N 148 50 8.605W 11500.00 95.70 246.14 8991.22 -4627.98 -1567.43 5945119,94 644025.45 70 15 27,104 N 148 50 9.253W 11520,00 96.26 250.12 8989.14 -4635.39 -1585.88 5945112.17 644007.14 70 15 27.031 N 148 50 9.790W 11550.00 93.66 248.62 8986.54 -4645.92 -1613.85 5945101.10 643979.39 70 15 26,927 N 148 50 10.604W 11600.00 89.32 246.13 8985.24 -4665.15 -1659.97 5945080.99 643933.65 70 15 26.738 N 148 50 11.945W 11650.00 84.99 243.64 8987.72 -4686.34 -1705.17 5945058.93 643888.87 70 15 26.529 N 148 50 13.260W 11700.00 80.66 241.11 8993.97 -4709.33 -1749.11 5945035.10 643845.38 70 15 26.303 N 148 50 14.538W 11720.00 78.93 240.08 8997.51 -4718.99 -1766.26 5945025.11 643828.43 70 15 26.208 N 148 50 15.037W 11750.00 79.97 242.95 9003.00 -4733.05 -1792.18 5945010.54 643802.79 70 15 26.070 N 148 50 15.791 W 11800.00 81.76 247.68 9010.95 -4753.66 -1837.02 5944989.08 643758.36 70 15 25.867 N 148 50 17.096W 11850.00 83.60 252.36 9017.32 -4770.60 -1883.61 5944971.24 643712.10 70 15 25.700 N 148 50 18.451 W 11900.00 85.48 257.02 9022.08 -4783.73 -1931.61 5944957.19 643664.38 70 15 25.571 N 148 50 19.847W 11910.00 85.86 257.95 9022.84 -4785.89 -1941.34 5944954.84 643654.69 70 15 25.550 N 148 50 20.130W 11950.00 85.87 253.94 9025.72 -4795.58 -1980.03 5944944.40 643616.19 70 15 25.454 N 148 50 21.256W 12000.00 85.91 248.92 9029.31 -4811.46 -2027.29 5944927.62 643569.25 70 15 25.298 N 148 50 22.631 W 12050.00 85.98 243.91 9032.85 -4831.41 -2072.99 5944906.79 643523.95 70 15 25.102 N 148 50 23.960W 12100.00 86.09 238.90 9036.31 -4855.27 -2116.77 5944882.08 643480.64 70 15 24.867 N 148 50 25.233W 12150.00 86.22 233.89 9039.67 -4882.87 -2158.31 5944853.69 643439.65 70 15 24.595 N 148 50 26.441 W 12200.00 86.38 228.88 9042.90 -4914.00 -2197.28 5944821.81 643401.29 70 15 24.289 N 148 50 27.575W 12250.00 86.57 223.88 9045.97 -4948,42 -2233.40 5944786.71 643365.85 70 15 23.950 N 148 50 28.625W 12300.00 86.78 218.87 9048.88 -4985.86 -2266.38 5944748.63 643333.60 70 15 23.582 N 148 50 29.585W 12350.00 87.02 213.87 9051.58 -5026.05 -2295.98 5944707.88 643304.79 70 15 23.187 N 148 50 30.445W 12400.00 87.28 208.87 9054.06 -5068.68 -2321.97 5944664.77 643279.63 70 15 22.767 N 148 50 31.201 W 12450.00 87.57 203.87 9056.31 -5113.41 -2344.15 5944619.62 643258.32 70 15 22.327 N 148 50 31.846W 12500.00 87.87 198.88 9058.30 -5159.92 -2362.35 5944572.77 643241.02 70 15 21.870 N 148 50 32.375W 12550.00 88.19 193.89 9060.02 -5207.85 -2376.44 5944524.58 643227.86 70 15 21.398 N 148 50 32.784W 12600.00 88.52 188.90 9061.46 -5256.83 -2386.31 5944475.42 643218.94 70 15 20.917 N 148 50 33.071 W 12610.00 88.58 187.90 9061.72 -5266.72 -2387.77 5944465.51 643217.67 70 15 20.819 N 148 50 33.113W 12650.00 89.42 191.81 9062.41 -5306.11 -2394.61 5944425.99 643211.59 70 15 20.432 N 148 50 33.312W 12700.00 90.47 196.70 9062.46 -5354.56 -2406.92 5944377.32 643200.22 70 15 19.955 N 148 50 33.670W 12750.00 91.51 201.59 9061.60 -5401.77 -2423.31 5944329.80 643184.75 70 15 19.491 N 148 50 34.146W 12800.00 92.54 206.49 9059.84 -5447.39 -2443.66 5944283.80 643165.29 70 15 19.042 N 148 50 34.738W 12850.00 93.55 211.39 9057.18 -5491.07 -2467.81 5944239.67 643141.99 70 15 18.613 N 148 50 35.440W 12900.00 94.54 216.30 9053.65 -5532.48 -2495.58 5944197.73 643115.02 70 15 18.205 N 148 50 36.247W 12910.00 94.73 217.29 9052.84 -5540.46 -2501.55 5944189.63 643109.21 70 15 18.127 N 148 50 36.421 W 12950.00 94.17 213.32 9049.73 -5573.00 -2524.59 5944156.66 643086.80 70 15 17.807 N 148 50 37.091 W 13000.00 93.43 208.36 9046.42 -5615.83 -2550.16 5944113.35 643062.07 70 15 17.385 N 148 50 37.834W BP Amoco Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB Y Pad Well: Y-14 Welipath: Y-14~., Date: 5/18/2001 Time: 11:02:34 Co-ordinate(NE) Reference: Well: Y-14, True North Vertical (TVD) Reference: 21: 14 6/6/1996 15:50 85.0 Section (VS) Reference: Well (0.00N,0.00E,204.00Azi) Plan: Plan #lb Page: 4 Survey Map Map < ....Latitude .... > <--- Longitude ---> MD Incl Azim TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec ff deg deg ff ff ft ff 13050.00 92.67 203.41 9043.76 -5660.73 -2571.95 5944068.04 643041.16 70 15 16.944 N 148 50 38.467W 13100.00 91.88 198.47 9041.77 -5707.38 -2589.80 5944021.06 643024.21 70 15 16.485 N 148 50 38.986W 13150.00 91.09 193.53 9040.47 -5755.41 -2603.57 5943972.77 643011.37 70 15 16.012 N 148 50 39.386W 13200.00 90.28 188.60 9039.87 -5804.46 -2613.16 5943923.55 643002.73 70 15 15.530 N 148 50 39.665W 13250.00 89.48 183.66 9039.98 -5854.16 -2618.50 5943873.76 642998.36 70 15 15.041 N 148 50 39.819W 13280.00 88.99 180.70 9040.38 -5884.13 -2619.64 5943843.77 642997.80 70 15 14.746 N 148 50 39.852W CDR1 BOP Wellhead ' Stack for Drilling Operations Rig Floor 5-1/2' Lubricator 5.57 11.2 19..2' I I I Shaffer BOPE 5K W.P ' I [ T.O.T. BOPE 5K W.P ' l!).3 ,~nnulnr BOP (Hydrll) 7-1/16' ID Annular BOP (Hydrll) 7-1/16~ ID Top Blind / Shear Btm 2.3/8' Rams Kill Line Top 2.7/8' Pipe / Slips Btm 2.3/8' Pipe / Slips Manual Master Valve Annulus Ground Level VENDOR ALASKAOILA O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 051401 CKO51401B 100. O0 100. O0 PYMT (OMMENTS: Pe~it to D~ill Fee HANDL1NQ INST: S/H - Tel~-ie Hubt le X46~8 rHE A'I'TACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. ~ll~e3f-~ ] 100- CO 100. CO BP EXPLORATION, (ALASKA)INC. RO. BOX 196612 ANCHORAGE, ALASKA 99519-6612 PAY To Th e ORDER O~ FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL OilY BANK CLEVELAND, OHiO 56-389 412 No.,H ~899,09 CONSOLIDATED .COMMERCIAL ACCOUNT O018990c? ANCHORA~!~ AK 99,~0:1 WELL PERMIT CHECKLIST COMPANY WELL NAME y-/~Z~> PROGRAM: exp dev ~< redrll /~ serv wellbore seg ann. disposal para req FIELD & POOL INIT CLASS Z~,z,, /'--,~, ) ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ............. 26. BOPE press rating appropriate; test to 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. GEOLOGY L AREA N N N UNIT# ON/OFF SHORE Y N~~~~ Y N -. Y N ,,-'" ~ N ' ' 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N /// 31. Data presented on potential overpressure zones ....... Y' NJ 32. Seismic analysis of shallow gas zones ............. 33. Seabed condition survey (if off-shore) ............. ,,,,'f 34. Contact name/phone for weekly progress reports [exploratory only N ANNULAR DISPOSAL35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; .... . . . Y N APPR DATE (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular COMMISSION: TEM ~./~/~,? ~"~,~__ JMH ~ Comments/Instructions: Z -.I ""r c:\msoffice\wordian\d iana\checklist (rev. 11/01//00) Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this. . nature is accumulated at the end of the file under APPEN. DIXi ., No Special'effort has been made to chronologically organize this category of information. **** REEL HEADER **** RWD 02/02/01 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** RWD 02/02/02 168220 01 USMPR 1.20 Datum *** LIS COMMENT RECORD !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!!!!!!!!!!!!!!!! Extract File: ldwg.las ~Version Information VERS. 1.20: CWLS log ASCII Standard -VERSION WRAP. NO: ~Well Information Block %MNEM.UNIT Data Type STRT.FT 11284.0000: STOP.FT 12171.0000: STEP.FT 0.5000: NULL. -999.2500: COMP. COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API API NUMBER: ~Parameter Information BloCk %MNEM.UNIT Value %-- -- One line per frame Information __ Starting Depth Ending Depth Level Spacing Absent Value BP Exploration, Inc. Y-14B Prudhoe Bay Unit 492' SNL , 706' EWL North Slope Borough Alaska Baker Hughes INTEQ USMPR 06-Aug-01 500292183202 Description SECT. 34 TOWN.N liN RANG. 13E,UM PDAT. MSL EPD .F 0 : Section : Township : Range : Permanent Datum : Elevation Of Perm. LMF . RKB : Log Measured from Bushing Floor Level the Run 4. FAPD.F 85.00 : DMF . KB : EKB .F 85.00 : Feet Above Perm. Datum Drilling Measured From Elevation of Kelly EDF .F N/A : Elevation of Derrick EGL .F N/A : Elevation of Ground CASE.F N/A : Casing Depth OS1 . DIRECTIONAL : Other Services Line 1 ~Remarks (1) Ail depths are Measured Depths (MD) unless otherwise noted. (2) Well Y-14B was kicked off @ 11291' MD (8915' SSTVD) from wellbore of Well Y-14A. (3) Well Y-14B was drilled to TD at 12171' MD (8953~ SSTVD) on (4) The hole section from 11780' MD (8922' SSTVD) to 11642' MD (8911' SSTVD) was logged with Ultra Slim Multiple Propagation Resistivity tool while pumping out of hole approximately 31 hours after the hole section was initially drilled. (5) No resistivity on the interval from 11900' MD (8931' SSTVD) to 12171' MD (8953' SSTVD) due to USMPR failure. (6) The data presented here is final and has not been depth shifted to a PDC (Primary Depth Control). As per BPX instructions, Gamma Ray RWD is the PDC for Y-14B boreholeo (7) A Magnetic Declination correction of 26.54 degrees has been applied to the Directional Surveys. 1.0 SURFACE EQUIPMENT: Main surface system software: MSS4 version 4.03 Memory dump system software: D-Series rev 1-03/PowerComms Rev DOWNHOLE EQUIPMENT: Natural Gamma Ray sensor:NaI Scintillation counter MPR Resistivity : 2 MHz and 400 kHz electronic wave RWD Memory rates: Gamma Ray 10 seconds MPR Resistivity 5 seconds Note: Each of the resistivity measurements has un upper limit to it's measurement specification° Above these values the traces can show an exagerated response. 2 MHz Resistivity from Phase Difference 3000 Ohmm 2 MHz Resistivity from Attenuation 500 Ohmm 400 kHz Resistivity from Phase Difference 1000 Ohmm 400 kHz Resistivity from Attenuation 200 Ohmm LOG ENVIRONMENTAL CORRECTIONS: Gamma Ray: Corrected for sensor type and collar size. No correction has been applied for nominal hole size, mud weight or potassium content. Resistivity: Corrected for tool size, nominal hole size and mud resistivity. Compensated readings obtained by use of dual transmitter configuration MNEMONICS: GRAM = Gamma Ray MWD-API [MWD] (MWD-API units) ROPS = Rate of Penetration, feet/hour TVD = Subsea True Vertical Depth (SSTVD), (feet) TCDM = Downhole Temperature [MWD], (deg F) RACLM = Resistivity Compensated 400 kHz Attenuation Resistivity Borehole Corrected [MWD], (ohm-m) RPCLM = Resistivity Compensated 400 kHz Phase Difference Resistivity Borehole Corrected [MWD], (ohm-m) RACHM = Resistivity Compensated 2 MHz Attenuation Resistivity Borehole Corrected [MWD], (ohm-m) RPCHM = Resistivity Compensated 2 MHz Phase Difference Resistivity Borehole Corrected [MWD], (ohm-m) SENSOR OFFSETS: RUN RESISTIVITY GAMMA DIRECTIONAL 1 24.08 ft. 17.27 ft. 36.87 ft. 2 24.08 ft. 17.27 ft. 36.87 ft. 3 24.06 ft. 17.25 ft. 36.85 ft. 4 24.01 ft. 17.20 ft. 36.80 ft. CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT N/A N/A N/A ~ No depth shifting applied. Gamma Ray RWD is the PDC Tape Subfile: 1 97 reCords°.. Minimum record length: Maximum record length: 14 bytes 132 bytes **** FILE HEADER **** RWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU WDFN mwd.xtf LCC 150 CN BP Exploration, Inc. WN Y-14B FN Prudhoe Bay Unit COUN STAT North Slope Borough Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented is the field raw data. 2. The data has been not depth shifted. 3. Gamma Ray RWD is the Primary Depth Control curve *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM GB3LM GRAM GRAM ROPS ROPS ROPS RACH RACH RACHM RACL RACL RACLM RPCH RPCH RPCHM RPCL RPCL RPCLM TCDM TCDM TCDM * FORMAT RECORD (TYPE% 64) Data record type is: 0 Datum Frame Size is: 32 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: IF ] Number of frames per record is: 3]. One depth per frame (value= 0) Datum Specification Block Sub-type is: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units 1 GRAM RWD 68 1 API 2 ROPS RWD 68 1 F/HR 3 RACH RWD 68 1 OHMM 4 RACL RWD 68 1 OHMM 5 RPCH RWD 68 1 OHMM 6 RPCL RWD 68 1 OHMM 7 TCDM RWD 68 1 degF Total Data Records: 58 ODEP 0 0 0 0 0 0 0 0 0 0 0 0 0.0 Size Length 4 4 4 4 4 4 4 4 4 4 4 4 4 4 28 Tape File Start Depth = 11284.000000 Tape File End Depth = 12171.000000 Tape File Level Spacing = 0~500000 Tape File Depth Units **** FILE TRAILER **** Tape Subfile: 2 Minimum record length: Maximum record length: = feet 72 records... 54 bytes 4124 bytes **** TAPE TRAILER **** RWD 02/02/02 168220 01 **** REEL TRAILER **** RWD 02/02/01 BHI 01 Tape Subfile: 3 Minimum record length: Maximum record length: Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GRAM RPCH RPCL 11284.0000 -999.2500 0.3770 0.0900 0.0790 11284.5000 26.5320 0.1450 0.1460 0.0780 11300.0000 26.9330 0.0410 1.1900 0.1960 11400.0000 199.1080 2.0810 14.9590 21.9490 2 records... 132 bytes 132 bytes ROPS TCDM -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 44.1360 165.8750 RACH 0.1620 0.1940 0.0450 22.7800 RACL 11500.0000 999.2500 9.4230 11600.0000 11.0360 9.5530 11700.0000 5.4480 7.0340 11800.0000 7.3280 6.3300 11900.0000 999.2500 -999.2500 12000.0000 999.2500 -999.2500 12100.0000 999.2500 -999.2500 12171.0000 999.2500 -999.2500 36 1500 488 8570 50 9790 3 9760 44 0640 6 7050 34 6610 6 8410 30 1100 -999 2500 154 4220 -999 2500 22 9480 -999 2500 -999 2500 -999.2500 91.3000 169.4750 48.9970 173.0750 104.3400 169.4620 99.5940 169.4750 144.4720 169.7000 54.1960 176.4500 91.8000 176.4500 53.3200 -999.2500 133.8570 3.7830 6.3800 6.5710 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 11284.000000 Tape File End Depth = 12171.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet [] Tape Subfile 3 is type: LIS