Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
201-164
STATE OF ALASKA RECEIVED ALA OIL AND GAS CONSERVATION COMWSION REPORT OF SUNDRY WELL OPERATIONS FEB 0 8 2018 1.Operations Abandon UTubing U b U p LJ Plug Perforations LJ Fracture Stimulate Pull r rt h n Performed: Suspend ❑ Perforate ❑ Other Stimulate❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ arforate New Pool ❑ Repair Well❑ Re-enter Susp Well ❑ Other:Convert to Injector 0 2.Operator 4.Well Class Before Work: 5. Permit to Drill Number: Name: Hilcorp Alaska LLC Development Exploratory P ❑ ❑ 201-164 ✓/ 2424 2171( 3.Address: 3800 Centerpoint Dr,Suite 1400 Anchorage, Stratigraphic❑ Service ❑ 6.API Number: AK 99503 50-029-23038-60-00 7. Property Designation(Lease Number): 8.Well Name and Number: ADL0025517 MILNE PT UNIT SB I-12L1 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A MILNE POINT/SCHRADER BLUFF OIL 11.Present Well Condition Summary: Total Depth measured 12,500 feet Plugs measured N/A feet true vertical 3,631 feet Junk measured N/A feet Effective Depth measured 12,500 feet Packer measured 9,504 feet true vertical 3,631 feet true vertical 3,572 feet Casing Length Size MD TVD Burst Collapse Conductor 108' 20" 108' 108' N/A N/A Surface 2,906' 10-3/4" 2,906' 2,408' 3,580psi 2,090psi Intermediate 10,228' 7" 10,228' 3,706' 7,240psi 5,410psi Liner"A" 2,457' 4-1/2" 12,393' 3,716' 8,430psi 7,500psi Liner"B" 2,232' 4-1/2" 12,396' 3,715' 8,430psi 7,500psi Perforation depth Measured depth See Schematic feet 6 2018 S`ItNNE® FEB 1 True Vertical depth See Schematic feet Tubing(size,grade,measured and true vertical depth) 3-1/2" 9.3#/L-80/EUE MOD 9,644' 3,597' 7"x 3-1/2"TNT 9,504'(MD) Packers and SSSV(type,measured and true vertical depth) Perm.Hyd. N/A 3,572'(TVD) N/A 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 20 0 Subsequent to operation: 0 0 711 1,160 699 14.Attachments(required per 20 PAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ❑✓ Exploratory El Development iii Service Q Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil U Gas ❑ WDSPL LJ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑✓ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 317-598 Authorized Name: Bo York Contact Name: Stan Porhola Authorized Title: Operations Manager Contact Email: sporhola@hilcorp.com Authorized Signature: Date: 2/7/2018 Contact Phone: 777-8412 Form 10-404 Revised 4/2017 1-//74 RQn!".S L t— F79 - 9 2C18 Submit Original Only • • Hilcorp Alaska, LLC �� Weekly Operations Summary bp Co 4- 2,1z°11'°°t Well Name Rig API Number Well Permit Number Start Date End Date MP 1-12 Pumper 50-029-23038-00-00 201-163 1/11/18 1/13/18 Daily Operations: 1/10/2017-Wednesday No activity to report. 1/11/2017 -Thursday MIRU Little Red Pumping Unit. PT lines to 3,500 psi. Pump 4 bbl diesel and pressure test 7" casing to 2,846 psi, bled to 2,793 psi in 30 min (lost 53 psi; passed). Bled off to 0 psi, returned 4 bbl diesel. RDMO. 1/12/2017-Friday No activity to report. 1/13/2017-Saturday MIRU Little Red Pumping Unit. PT lines to 3,500 psi. Pump 0.05 bbl 60/40 McOH and pressure test surface lines from injection header to 2,731 psi, bled to 2,708 psi in 5 min (lost 23 psi; passed). Bled off to 0 psi, returned 0.05 bbl 60/40 McOH. Perform injectivity test w/ produced water. Pump a total of 53 bbl @ 1 bpm. Max injection pressure of 505 psi. Displace w/3 bbl 60/40 McOH.;Turn well over to operators and place on injection @ 300 bwpd. RD Little Red. 1/14/2017 -Sunday No activity to report. 1/15/2017 - Monday No activity to report. 1/16/2017-Tuesday No activity to report. Milne • Well: MPUPoint 1Unit 11 • SCHEMATIC Last Compl d: 11/08/2016 Ililcarp Alaska,LLC PTD - A 2.,0`„164.. WELLHEAD (.--t4>,,I Wellhead FMC Tubing Hanger,11"x 3-1/2"TC-Il Top&Bottom 2,/2,0/20 i It Orig.KB Elev.:64.7'/Orig.GLEIev.:34.7 OPEN HOLE/CEMENT DETAIL RKB-Hanger:15.20'(ASR) 20" Cmt w/650 sx of Arcticset I in 30"Hole , I i ,.., :, 10-3/4" Cmt w/585 sx AS Lite,502 sx Class"G"in 13-1/2"Hole 20 7" Cmt w/1,172 sx Class"G"in 9-7/8"Hole CASING DETAIL Size Type Wt/Grade/Conn Drift ID Top Btm R' 20" Conductor 92/H-40/Welded N/A Surf 108' 10-3/4" Surface 45.5/L-80/Btrc. 9.794 Surf 2,906' il • (F] 1 7" Intermediate 26/L-80/Btc-Mod 6.151 Surface 10,228' 1 4-1/2" Liner"A" 12.6/L-80/IBT 3.833 9,936' 12,393' ti 4-1/2" Liner"B" 12.6/L-80/IBT 3.833 10,164' 12,396' 10 /4',. tit, TUBING DETAIL 3-1/2" Tubing 9.3/L-80/EUE-MOD 2.867 Surf 9,644' LINER DETAIL 4-1/2" OA Solid Liner 12.6/L-80/IBT 3.833 9,936' 9,980' 4-1/2" OA Slotted Lnr 12.6/L-80/IBT 3.833 9,980' 12,393' 4-1/2" OB Solid Liner 12.6/L-80/IBT 3.833 10,164' 10,373' 4-1/2" OB Slotted Lnr 12.6/L-80/IBT 3.833 10,373' 12,396' WELL INCLINATION DETAIL KOP@300'MD Max Wellbore Angle=85.5 deg @ 8,102'MD 63.74 deg @ 2,550'MD JEWELRY DETAIL No Depth Item 1 2,345' GLM 3-1/2"x 1-1/2"Patco GLM(DGLV Set 11/08/16) 2 9,339' 3-1/2"XD Sliding Sleeve(2.813"Packing Bore Min ID;Closed 11/17/17) 3 9,427' 3-1/2"NDPG-C Single-drop Intake Gauge(2.913"ID) 4 9,485' 3-1/2"X Profile(2.813"Packing Bore Min ID) 5 9,504' 7"x 3-1/2"TNT Permanent Hydraulic Set Packer(2.949"ID) 6 9,558' 3-1/2"Autofill Sub(2.88"ID) 7 9,643' Wireline Entry Guide(Btm at 9,644') Mn ID=2813'ID i s I 2 8 9,906' Baker Hook Wall,Hanger above 7"Window 1., Ill X ,-, 9 9,928' Baker Hook Wall,Hanger below 7"Window `, 3 w 10 9,930' Baker Tension Lock Swivel r 11 10,116' Baker Tie Back Sleeve 1; ; 12 10,128' Baker ZXP Liner Top Packer MnID=2.813"ID* E 4 9 13 10,147' Baker?"x5"HMC Liner Hanger 121 r; t t 14 12,395' Btm 4-1/2"Pack-off Bushing 1..; '_ ' 5 15 12,435' Btm 4-1/2"Guide Shoe ij 16 12,396' Btm Baker Pack-off Bushing 17 12,439' Btm Baker 4-1/2"Guide Shoe -J6 ;" LATERAL WINDOW DETAIL 1-] ,; Top of"OA"Window @ 9,916'MD;Bottom @ 9,928'MD;Angle @ top of window is 80 deg Top of"OB"Window @ 10,228'MD;Bottom @ 10,240'MD;Angle @ top of window is 87 deg GENERAL WELL INFO 8 (\ API:50-029-23038-00-00 9 .( \� r Drilled and Cased by Nabors 4ES-12/08/2001 r 10 Y so 14 ESP Completion by Nabors 4ES-12/15/2001 FISH-3-1/2"X- P,.1 Convert to ESPCP by Nabors 4ES-6/30/2010 OA"Latera 15 Lock,3"RCOM Jet F"'_ 1.;', �;.. ....;, Convert to TTC-ESPCP by Doyon 16-12/05/2014 121 i- ,• 13 Pump(Serial BP- Convert to ESPCP by ASR 1-1/17/2016 - 1078),Bottom Convert to Jet Pump by ASR 1-11/08/2016 1screen.Fish Length= Convert to Injector by Pump Truck-1/13/2018 'OB"Lateral aN3 17 5.83'.Could be in 7 either lateral. TD=12,470'(MD)/TD=3,712'(TVD) .(-`I/ PBTD=12,470'(MD)/PBTD=3,712'(TVD) , Revised By:TDF 2/6/2018 OF Thy • �wA�� +�,, THE STATE• Alaska Oil and Gas � ;ldtes 1 of L sConservation Commission =-= ;_ 333 West Seventh Avenue *h;., I GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 oFALASJ- Fax: 907.276.7542 www.aogcc.alaska.gov Bo York Operations Manager Hilcorp Alaska, LLC SCANtE® JAN 1 7 2)J18 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Milne Point Field, Schrader Bluff Oil Pool, MPU I-12L1 Permit to Drill Number: 201-164 Sundry Number: 317-598 Dear Mr. York: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Hollis S. French L Chair DATED this l day of January, 2018. • • STATE OF ALASKA jri :. ., 2 , O17 ALASKA OIL AND GAS CONSERVATION COMMISSION 1 APPLICATION FOR SUNDRY APPROVALS A e 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations 0 Fracture Stimulate 0 Repair Well 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate ❑ Pull Tubing ❑ Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other: Convert to Injector 0• 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Hilcorp Alaska LLC • Exploratory ❑ Development Q• 201-164• 3.Address: 3800 Centerpoint Dr,Suite 1400Stratigraphic ❑ Service ❑ 6.API Number: Anchorage Alaska 99503 50-029-23038-60-00 - 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 477.05 Will planned perforations require a spacing exception? Yes 0 No 0 / MILNE PT UNIT I-12L1 • 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0025517 • MILNE POINT/SCHRADER BLUFF OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 12,500' ' 3,631' • 12,500' 3,631' 1,255 N/A N/A Casing Length Size MD TVD Burst Collapse Conductor 108' 20" 108' 109' N/A N/A Surface 2,906' 10-3/4" 2,906' 2,408' 3,580psi 2,090psi Intermediate 10,228' 7" 10,228' 3,706' 7,240psi 5,410psi Liner"A" 2,457' 4-1/2" 12,393' 3,716' 8,430psi 7,500psi Liner"B" 2,232' 4-1/2" 12,396' 3,715' 8,430psi 7,500psi Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Schematic / See Schematic 3-1/2" 9.3#/L-80/EUE MOD 9,644' Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): 7"x 3-1/2"TNT Perm.Hyd.and N/A 9,504'(MD)/3,572'(TVD)and N/A 12.Attachments: Proposal Summary Q Wellbore schematic [J 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory 0 Stratigraphic 0 Development❑ Service 0 • 14.Estimated Date for 15.Well Status after proposed work: 1/1/2018 Commencing Operations: OIL ❑ WINJ 2 • WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Bo York Contact Name: Stan Porhola Authorized Title: Operations Manager Contact Email: SDOrhOlaahiICOrp.COm 7 Contact Phone: 777-8412 Authorized Signature: / Date: 12/21/2017 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 313— qAi° sit-- , Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test L Location Clearance ❑ Other: )41t✓,^12d.4_ <-,,cLe..Y- p/ c.en.-e et pt',",,%c.. fess z 6 ML-- Z 55, '1/Z.a) Post Initial Injection MIT Req'd? Yes Tr.-No ❑ Spacing Exception Required? Yes 0 No Subsequent Form Required: / 1.,.._ .„...3 r L_ a 6', ,t APPROVEDMM BSY 14 Approved by: � �.. COMMISSIONER THE COMMISSION Date: I ( ilk?) 0460- Ar��'' 0 R 1 G 1 N A L ��_z _, �}�"' Submit Form and �J Form 10-403 Revised 4/2017 Approved application is valid for 12 months from the date of approval. Attachme in Duplicate - H . • mil nlle Point MPUe Pop. . B We : SCHEMATIC Last Completed: 11/08/2016 Harem Alaska,LLC PTD: 201-163 WELLHEAD Wellhead FMC Tubing Hanger,11"x 3-1/2"TC-II Top&Bottom Orig.KB Elev.:64.7'/Orig.GL Elev.:34.7' OPEN HOLE/CEMENT DETAIL RKB-Hanger:15.20'(ASR) 20" Cmt w/650 sx of Arcticset I in 30"Hole x m 10-3/4" Cmt w/585 sx AS Lite,502 sx Class"G"in 13-1/2"Hole 20' +,, 7" Cmt w/1,172 sx Class"G"in 9-7/8"Hole u CASING DETAIL Size Type Wt/Grade/Conn Drift ID Top Btm 1,3 20" Conductor 92/H-40/Welded N/A Surf 108' 10-3/4" Surface _ 45.5/L-80/Btrc. 9.794 Surf 2,906' 1 7" Intermediate 26/L-80/Btc-Mod 6.151 Surface 10,228' 1 4-1/2" Liner"A" 12.6/L-80/IBT 3.833 9,936' 12,393' 4-1/2" Liner"B" 12.6/L-80/IBT 3.833 10,164' 12,396' 10-3/4"4 0 TUBING DETAIL f `4 t 3-1/2" Tubing 9.3/L-80/EUE-MOD 2.867 Surf 9,644' , LINER DETAIL 4-1/2" OA Solid Liner 12.6/L-80/IBT 3.833 9,936' 9,980' 4-1/2" OA Slotted Lnr 12.6/L-80/IBT 3.833 9,980' 12,393' 4-1/2" OB Solid Liner 12.6/L-80/IBT 3.833 10,164' 10,373' ,'I �( 4-1/2" OB Slotted Lnr 12.6/L-80/IBT 3.833 10,373' 12,396' Ig WELL INCLINATION DETAIL KOP @ 300'MD [ Max Wellbore Angle=85.5 deg @ 8,102'MD 63.74 deg @ 2,550'MD JEWELRY DETAIL No Depth Item 1 2,345' GLM 3-1/2"x 1-1/2"Patco GLM(DGLV Set 11/08/16) 2 9,339' 3-1/2"XD Sliding Sleeve(2.813"Packing Bore Min ID;Closed 11/17/17) 3 9,427' 3-1/2"NDPG-C Single-drop Intake Gauge(2.913"ID) 4 9,485' 3-1/2"X Profile(2.813"Packing Bore Min ID) ', : 5 9,504' 7"x 3-1/2"TNT Permanent Hydraulic Set Packer(2.949"ID) 6 9,558' 3-1/2"Autofill Sub(2.88"ID) 7 9,643' Wireline Entry Guide(Btm at 9,644') Mn ID=2.813"ID �i r I 2 8 9,906' Baker Hook Wall,Hanger above 7"Window 9 9,928' Baker Hook Wall,Hanger below 7"Window 4 3 it 10 9,930' Baker Tension Lock Swivel 0, 11 10,116' Baker Tie Back Sleeve , tt 12 10,128' BakerZXP Liner Top Packer Mn ID=2.813"ID. 9 4 3 13 10,147' Baker 7"x 5"HMC Liner Hanger ! 14 12,395' Btm 4-1/2"Pack-off Bushing r rter 5 15 12,435' Btm 4-1/2"Guide Shoe it1 16 12,396' Btm Baker Pack-off Bushing _ 14 ' 17 12,439' Btm Baker 4-1/2"Guide Shoe 111 6 t LATERAL WINDOW DETAIL il il Top of"OA"Window @ 9,916'MD;Bottom @ 9,928'MD;Angle @ top of window is 80 deg Top of"OB"Window @ 10,228'MD;Bottom @ 10,240'MD;Angle @ top of window is 87 deg i i 7 ,' GENERAL WELL INFO 9' ,Z I✓A- API:50-029-23038-00-00 °8 I,> I =9 Drilled and Cased by Nabors 4ES-12/08/2001 ss 4`,t , 10 14 ESP Completion by Nabors 4ES-12/15/2001 � FISH-3-1/2"X Convert to ESPCP by Nabors 4ES-6/30/2010 "OA; 15 Lock,3"RCOM Jet Convert to TTC-ESPCP by Doyon 16-12/05/2014 11 16 Pump(Serial BP Convert to ESPCP by ASR 1-1/17/2016 12 X 13 1078),Bottom Convert to Jet Pump by ASR 1-11/08/2016 screen.Fish Length= ` "OB"Lateral 4 17 5.83'.Could be in 7' ` either lateral. 1D=12,470'(MD)/TD=3,712'(TVD) J.r- I L- PBTD=12,470'(MD)/PBTD=3,712'(TVD) Revised By:STP 11/27/2017 ll_ • Well Prognosis Well: MPU 1-12 _ Itileorp Alaska,LU Date:12/18/2017 Well Name: MPU 1-12 API Number: 50-029-23038-00 Current Status: SI Oil Well [Jet Pump] Pad: I-Pad Estimated Start Date: January 1St,2018 Rig: NJA Reg.Approval Req'd? Yes Date Reg.Approval Rec'vd: Regulatory Contact: Tom Fouts Permit to Drill Number: 201-163 First Call Engineer: Stan Porhola (907)777-8412 (0) (907)331-8228 (M) Second Call Engineer: Paul Chan (907)777-8333 (0) (907)444-2881 (M) AFE Number: 1724074 Job Type: Convert to Injector Current Bottom Hole Pressure: 1,655 psi @ 4,000'TVD (Last BHP measured 11/15/2017) Maximum Expected BHP: 1,655 psi @ 4,000'TVD (No new perfs added, EMW= 7.96 ppg) MPSP: 1,255 psi (0.10 psi/ft gas gradient) Brief Well Summary: MPU 1-12 was drilled in 2001 using Nabors 22E and completed as a multi-lateral in the Schrader Bluff OA and OB sands with an ESP pump. ESP changeouts took place in 2010 and 2014, the most recent was an ESP changeout in 2014 using Doyon #16 to replace the conventional ESP with a TTC-ESPCP (Thru-tubing conveyed electric submersible progressive cavity pump). In September 2015,the failed TTC-ESPCP was replaced using coil tubing. However, the new pump failed to work. A rig workover pulled the completion and ran an ESPCP pump in January 2016 but the pump failed in June 2016 due to solids production.The well was converted to a reverse circulating jet pump in November 2016, but multiple attempts to set a jet pump in the sliding sleeve profile and establish consistent production have been unsuccessful. Notes Regarding Wellbore Condition • Deviation down to sliding sleeve section (max angle 85.5° @ 8,110'). • Casing last tested to 2,500 psi for 30 min down to 9,504'on 11/08/2016. • Cleaned out fill to 11,593'with coil tubing on 11/13/2016. • Jet pump lost in hole (unknown which lateral)at 11,303'CTM on 5/30/2017. AOR(status of wells within 1/4 mile radius of injection zone): API Well No Permit Well Current Zonal isolation(method) Status 50-029-23038-00-00 201-163 MPU 1-12 Idle Estimated TOC (calculated)at 6,880'MD Producer —2,370'above Schrader NB sand Active CBL run on 26 Aug 2001 indicates TOC at 50-029-23012-00-00 201-075 MPU 1-13 Injector —7,150'MD, 2,586' above Schrader NB sand. Objective: The purpose of this work/sundry is to convert this well from a SI Schrader Bluff producer to a Schrader Bluff injector to provide waterflood support for offset producer MPU I-11(PTD 201-137). • • 111 Well Prognosis — —. Well: MPU 1-12 -Hawn)Alaska,LU - Date:12/18/2017 Surface Procedure: 1. MIRU Little Red Pumping Unit. PT lines to 3,000 psi. 2. Test 7"casing to 2,700 psi for 30 min (charted). a. Notify AOGCC Inspector at least 24 hours prior to conducting pre-injection MIT-IA. b. Record on 10-426 form. c. Email to wrivard@hilcorp.com for submission to AOGCC. 3. Perform injectivity test w/8.5 ppg produced water. a. Inject at 1.0 bpm (1,440 bwpd)or a max 1,250 psi for injectivity test. Do not exceed 1,500 psi. 4. RD Little Red Pumping Unit. 5. MU surface lines from injection header to existing tree. PT lines to 2,700 psi. a. Pressure test lines at existing water header pressure(2,700 psi). 6. Turn well over to injection. 7. After stabilized injection,conduct an MIT-IA to 2,700 psi. a. Notify AOGCC Inspector at least 24 hours prior to conducting MIT-IA. b. Record on 10-426 form. c. Email to wrivard@hilcorp.com for submission to AOGCC. AOGCC Regulation Variance Requests: 20AAC25.412(b) "The packer must be placed within 200 feet measured depth above the top of the perforations..." Requesting a variance to set the packer more than 200 feet measured depth above the dual slotted liner. The packer is set at 9,504' MD/3,572'TVD at approximately 79° hole angle. The packer is 476' MD to the top of the OA sand slotted liner,which is 90'TVD from the packer to the OA sand. The packer is 869' MD to the top of the OB sand slotted liner,which is 150'TVD from the packer to the OB sand. Attachments: 1. Current Schematic 2. Area of Review(AOR)Summary 3. Area of Review Map 4. Surface Owner Affidavit • Area of Review Summary — Milne Point Unit 1-12 (PTD 201-163) This Area of Review is required prior to the conversion of well MPU 1-12 from a producer to a water injector. This AOR discusses wells with 'A mile of the well's entry point into the Schrader Bluff Formation OA sand (top of the injection zone) to the bottom of MPU 1-12 well bore completion. S".. N4S, *7. 1-12 1-14L1 \ - _ \ 1-.1261 1-,1‘ 1-10 1-11 1-06 1-116 MILNE POINT UNIT ................. KUPARUK RIVER UNIT Figure 1:Map showing wells within%mile radius from MPU 1-12. The list of all operators and surface owners within 'A mile of MPU 1-12 is below: Operators # Surface Owners 1 Hilcorp Alaska,LLC I Alaska Department of Natural Resources(ADNR) Table 1:List of operators and surface owners • • • An affidavit has been submitted to the following operators and surface owners: Operators # Surface Owners N/A 1 Alaska Department of Natural Resources(ADNR) Table 2:list of operators and surface owners receiving an affidavit One other wellbore, MPU 1-13 (PTD 201-075), enters the Schrader Bluff formation just outside this area of review. The tables below illustrate the wells within the AOR, distance from MPU I- 12, completion details, and annulus integrity/cement conditions based on in-depth review of each well: Well Name PTD Distance Annulus Integrity (Feet) _ MPU 1-12 201-163 0 TOC estimated at 6,880' MD based on volume pumped MPU I-13 201-075 1,460 TOC estimated at 7,150' MD—based on CBL dated 8/26/01 Table 3:Distance and annulus integrity of wells within AOR Well Casing Hole Vol. of Cement Schrader Bluff Schrader Bluff Name Size depth (MD) depth (TVDss) MPU 1-12 7" 9-7/8" 240 bbls 9,156' 3,438' MPU 1-13 7" 8-1/2" 296 bbls tail/358 bbls lead 9,700' 3,433' Table 4:Completion Detail Well MPU 1-12 was completed in December 2001. The completion enters the Schrader Bluff at 9,156' MD. A 10-3/4" surface casing was run to 2,905' MD and cemented to surface using 432 bbl of Permafrost Type"L"cement and 103 bbl of Class "G". Returns of 250 bbls of lead cement were seen at surface after the plug was bumped. The 10-3/4" casing was tested to 1,900 psi for 5 minutes after bumping the plug. Before drilling out the float collar and shoe track, the casing was tested to 1,500 psi for 30 minutes. A 7"production casing string was run from surface to 10,347' MD. The production casing string was cemented with 240 bbls of 15.8 ppg Class "G" cement. Plugs bumped with floats holding, and the estimated top of cement at 6,880' MD. The 7" casing was tested to 2,900 psi for 5 minutes. The 7" production casing was tested to 3,500 psi for 30 minutes prior to drilling out the float collar and shoe track. A lower lateral was drilled and a 4-1/2" slotted liner ran in the OB sand. An upper lateral was drilled and a 4-1/2" slotted liner ran in the OA sand. Well MPU 1-13 was completed in August 2001.The completion enters the Schrader Bluff at 9,700' MD. A 7" production casing (monobore) was run to 11,397' MD and cemented to surface using 296 bbls of Class"G"cement at the shoe,and 358 bbls of Permafrost Type"L"thru the DV collar at 1,416' MD. Returns of 10 bbls of lead cement were seen at surface after the plug was bumped during the job thru the TAM port collar. The 7"production casing was tested to 4,500 psi for 30 minutes after drilling out the TAM port collar. The well is a cased and perforated dual string completion, with one string in the OA sand and one string in the OB sand. • The injection zone is bracketed by a north-south fault to the east and a east-west fault to the north, isolating this pattern from the rest of the field.No faults are known to exist in the injection zone. 7-------4- ....„, 4 I ---- ,-"/ , 1 -- -- ---.:'----- — '""'"—* "h-T -----''''' 4 ' f-,,,, , .„.„. ill „..,,kn,.._ \., , ' ":.:-Z,. `... .‘n.,. /1"" . , '‘ \ I-, 3 sk. ) 1 i 14 \0 - N 0 --11i 3 -- ' ,721''' 7:7'1' 7 57 / 01 'N..) .") ) i 11\1, I 60 111-ftliri— (1.1 . Figure 2:Map showing faulting near MPU 1-12. Withdrawal and injection volumes and reservoirpressuresindicate this area is hydraulically isolated. This hydraulic unit is referred to as HU 1 3 While drilling the OB lateral for MPU 1-12 at 13,243' 243' MD (MPU 1-12PB1, API 50-029-23038- 70), the well took a kick with 9.2 ppg mud in thehole.HThe lateral was eventually killed with a the 11.9 ppg mud,but experienced lost circulation and13A became stuck and was not able to be fished out of the hole. The lateral and fish was plugged back and redrilled to 12,470'MD with 9.2 ppg mud and the 4-1/2"liner ran to bottom(MPU 1-12.API 50-029-23038-00). Offset injector MPU 1-13 was drilled before MPU 1-12 and encountered a pressure anomaly after it had TD'd the well,but this well had a large open hole section and this salt water kick was likely due to the North-South fault that separates MPU I-13and MPU I-10(see Figure 2 above). Offset producer MPU 1-11 (PTD 201-137)was drilled after MPU with9.2 p UI-12anpdgdid not encounter any pressure anomalies in the Schrader Bluff drilling dual lateralsmud in the same OA and OB sands as MPU 1-12. Offset Kuparuk River well KRU 3K-108(PTD 208-130)was drilled in 2008 in the Schrader Bluff equivalent sands (West Sak) and did not encounter any pressure anomalies within the interval, 1 I i • completing their liner with a 9.2 ppg brine. This well is immediately due west of the toe of the MPU I-12 well. Based on the immediate offset well information,it appears to be a small isolated anomaly that is isolated from the other wellbores in the area and not likely to impact the waterflooding of the reservoir from MPU 1-12 south to MPU I-11. Outside of the MPU I-12PBI anomaly, the original reservoir pressure in this hydraulic unit was 8.6 ppg EMW as of 2001. The current reservoir in 2017 is approximately 8.0 ppg EMW,based on the active downhole gauge on MPU 1-12. Injection confonnance of other offset injectors in adjacent patterns only applies to MPU 1-13 in this case. This well currently injects down dual strings, one injecting in the Schrader Bluff OA sand and one injecting in the Schrader Bluff OB sand. Injection rates and pressures indicate that there is limited conductivity to offset producers MPU I-11 and MPU 1-12.This is likely caused by near-wellbore damage in the MPU 1-13 completion that is preventing an effective water flood sweep to the offset producers. 0 . • • ___ ____ . .___ _..__. , I A e 1 i Cil d 1 I ! T 1 I 1 - ` 11 1 I I F I I !! 1 ! _1 ..0"----•N Itu / �1 1 1 I ! N 1 T • r 1 - ....._J `„w irT f , ,` 1 / \� i i1aJ H / Z tz � / j fl D it 1{ a I I II ! Y I II I I 11 I 11 it 1 4 I I1 11 11 - 11 I !1 1 It ! 1{ 1 N J1 It 1 II U f 1 I Ii — I- ,--- - - II O I r T i M I \o � i IT \\M I \ N A N r . } O Y T T -� ; \\ M ! AM M I \e if r: 1 \O I / r E 1 \.N \` 1 l Y MI !hh \\ M :, • . I /- ,: .. ''.., .'(', - ,,,. 1 to m a a o Q 0 t X11 % a x I 0 N m O�- � } -�. `" 4;,", {y*i{(j /ii. *, to ca::-7 b p QO • dO E N f * S;(j e 4--2 G,p 1:7 L L L 0000 , m it }I U! t a _i 3 1 ' a _.�Y it Yr _ `� ) Q .tom? .4..___.__.-..- ( I \tl 7I J t t t 1 n'�e r f o m R3 F I t I 1 ` 11' r, Q. m :1: - J J = W f I -, i a ,-WC J m S t :17 �' 11 f �1 I t 11 NNNII1 1 / e R �tI t - = = NC�j I t ( I 1f t/ J D D 0 �! t ./ , , r � I 1 1t It C7Q I t i ta t t t i" I N 4 lLi �� t I t d G# 1 t t O .,<3;Il f ( t :I 1 1 i ( I I--. 1 1 I �I'�� �� lilt I { 1.... d Miff I I K c= 2 o t,'/ a ,�(I m` I I 1 I 1) / in- heti 1 i k 1f N °• L,.„,......,..„..,' / , c,) f ' ti. I' 41/ 1 Z 11 Ii I I 4 ill C3kl ` N i t aY ` 1 Y r � OttN '!� r \ .�-� O C Rjj " ms 's 1 (V o, s •,--- a_ It X ' ` � N >✓ CL CC f1 it t d � _ G II t '5, 1 �. L � 1 n t 1 S ' r,t i I t III ( cn (13 o co �DIII U)---',,,::' I z tfi } 00I -i `\ 1 1 I�. \ D Ti 1 t in o Nr, t I z 1 11 1 o / '';' a N ,\ -- •+: '- ,t, r M ' Y M O ' T W al, , r M M . p, CV F"--'u'''N'''v cv N Z ci f tir: / w (n rY, .. O M (n 11 .-- ., U3 to a ,- Ca M 1 1 X , Ajc, 1h, Q � ti I J i ! °I1 IP Landowner Notification Letter MPI-12 - Page 2 of 2 VERIFIATION OF NOTICE PER 20 AAC 25.402(c)(3) MILNE POINT UNIT MPU I-12 I, Bo York, Operations Manager do hereby verify the following: I am acquainted with Hilcorp Alaska,LLC's application for sundry approval to the Alaska Oil and Gas Conservation Commission to convert well MPU 1-12 to an injector. Pursuant to pending regulation 20 AAC 25.402(c)(3), I assert that all owners, landowners, surface owners, and operators within a one-quarter mile radius of the current wellbore trajectory have been provided notice of Hilcorp Alaska, LLC's proposed operations. DATED at Anchorage,Alaska this_day of December,2017. Bo York,Operations Manager Hilcorp Alaska,LLC STATE OF ALAKSA ) ) ss THIRD JUDICIAL DISTRICT ) SUBSCRIBED TO AND SWORN before me this jday of December,2017 A - Rim,dze.c. PUBLIC IN AND FOR THE STATE OF ALSKA My Commission expires: Oei. fidwi STATE OF ALASKA ; NOTARY PUBLIC i 1 Alicia G.Showalter ':,; r* My Commission Expires Oct.4,2021 • ! Hilcorp Alaska,>6LC Post-Office sox-244027 Anchorage,AK 99524-4027 3800 Centerpoinl Drive Suite 1400 Anchorage,AK 99503 December 19,2017 Phone:907/777-8412 sporhola@hilcorp.com Chantal Walsh, Director Division of Oil & Gas Alaska Department of Natural Resources 550 W. 7`i' Avenue/Ste. 1100 Anchorage AK 99501-3563 Re: Notice of Conversion to Injection Operation—Milne Point Unit MPU I-12 Dear Mrs. Walsh, Hilcorp Alaska, LLC ("Hilcorp Alaska"), as Operator of the Milne Point Unit,has recently submitted an application to the Alaska Oil and Gas Conservation Commission ("AOGCC") to allow for the conversion to injector of Milne Point Unit Well MPU I-12. The surface of the well is located on ADL 025906 and the bottom hole location falls on ADL 025517. See attached map (Exhibit A). Hilcorp and our joint working interest owner, BP Alaska Exploration, Inc. ("BPXA"), own all applicable leases within the MPU. The State of Alaska, Department of Natural Resources is the sole landowner and surface owner. There are no other affected landowners, owners or operators within a '/ mile radius of the well. Sincerely, ork, Operations Manager, ILCORP ALASKA,LLC Attached—Exhibit A CC: John Dittrich, BPXA (via email John.dittrieh@bp.com) STATE OF ALASKA RECEIVED A KA OIL AND GAS CONSERVATION CC 1SSION REPORT OF SUNDRY WELL OPERATIONS DEC 2 22014 1. Operations Performed: AOGCC C ❑Abandon 0 Repair Well 0 Plug Perforations 0 Perforate 0 Re-Enter Suspended Well ❑Alter Casing ®Pull Tubing 0 Stimulate-Frac 0 Waiver ®Other ❑Change Approved Program 0 Operation Shutdown 0 Stimulate-Other 0 Time Extension Changeout ESP 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska) Inc. ❑Exploratory 0 Stratigraphic 201-164 3. Address: ®Development 0 Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-23038-60-00 7. Property Designation(Lease Number): 8. Well Name and Number: �- ADL#025906&025517 MPI-12L1 9. Logs(list logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): Milne Point Unit/Schrader Bluff 11. Present well condition summary: Total depth: measured 12500' feet Plugs.(measured) None feet true vertical 3631' feet Junk:(measured) None feet Effective depth: measured 12500' feet Packer: (measured) None feet true vertical 3631' feet Packer: (true vertical) None feet Casing Length Size MD TVD Burst Collapse Structural Conductor 79' 20" 29'- 108' 29'- 108' 1490 470 Surface 2877' 10-3/4" 29'-2906' 29'-2408' 5210 2480 Intermediate 9889' 7" 27'-9916' 27'-3650' 7240 5410 Production Liner 2530' 4-1/2" 9907'- 12437' 3648'-3635' 8430 7500 Perforation Depth Measured Depth: 9981'- 12394' feet SCANNED True Vertical Depth. 3658'-3638' feet Tubing(size,grade,measured and true vertical depth): 3-1/2",9.3# L-80 9582' 3586' Packers and SSSV(type,measured and true vertical depth): None None None 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment description including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation: 0 0 0 1020 0 Subsequent to operation: 0 0 0 0 0 14.Attachments: ❑Copies of Logs and Surveys run 15.Well Class after work: 0 Exploratory 0 Stratigraphic IN Development 0 Service ®Daily Report of Well Operations ®Welt Schematic Diagram 16. Well Status after work: ®Oil 0 Gas 0 WDSPL ❑GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact: J.E.B Bolen,564-5110 N/A Email:J.E.B.Bolen@bp.com Printed Name. Joe Lastufk Title: Drilling Technologist f-ForSignature: k hone: 564-4091 Date: 194/1 /1 if- Form m 10-404 Revised 10/2012Submit Original Only �•1`;_i5, �Zf,5 RBDMS .JAN - 4 North America-ALASKA-BP Page 1 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-01005-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/24/2014 21:00 - 23:00 2.00 MOB P PRE PJSM,PREP TO MOVE TO OFF OF MPF-54 -LAY DERRICK OVER AND SECURE ON DERRICK STAND -FUNCTION TEST MOVING SYSTEM HYDRAULICS AND ESD -RAISE RIG AND MOVE OFF OF MPF-54 -POSITION IN CENTER OF PAD -REMOVE BOP FORM CELLAR AND INSTALL REAR BOOSTER WHEELS 23:00 - 00:00 1.00 MOB N WAIT PRE RIG MOVE AROUND THE END OF THE PAD IS OBSTRUCTED BY INOPERABLE CRANE THAT IS RIGGED TO THE WSL OFFICE -WAIT ON MECHANIC CALLED OUT FROM DEADHORSE SEE TRACTION REPORT#IR-4871512 11/25/2014 00:00 - 02:00 2.00 MOB N WAIT PRE RIG MOVE AROUND THE END OF THE PAD IS OBSTRUCTED BY INOPERABLE CRANE THAT IS RIGGED TO THE WSL OFFICE -WAIT ON MECHANIC CALLED OUT FROM DEADHORSE. 02:00 - 06:00 4.00 MOB P PRE PJSM,BEGIN RIG MOVE. -MOVE AROUND MPF PAD TO ENTRANCE. -CONTINUE MOVE DOWN ACCESS ROAD TO MPL PAD. -MOVE RIG THRU MPL-PAD DOWN ACCESS ROAD TO MILNE PT SPINE ROAD. 06:00 - 12:00 6.00 MOB P PRE !CONTINUE TO MOVE RIG FROM MPF-54 TO MPI PAD. -ON LOCATION AT 11:00 HRS.INSPECT WELL HEAD,1000 PSI ON I/A,200 PSI ON 0/A. -VALVES AND WELLHEAD DRESSED OUT ACCORDING TO WELL PROGRAM. -SPOT TREE AND WELLHEAD EQUIPMENT BEHIND WELL. -CALL DRILL SITE OPERATOR FOR OPPORTUNITY TO WITNESS MOVING RIG OVER WELL. 12:00 - 16:00 4.00 MOB P PRE PJSM.SPOT RIG OVER WELL. -DOUBLE MATT UNDER RIG AND EXTENSIVE SHIMMING REQUIRED AS DRILLER'S SIDE HAS A LOW SPOT. -TAKE ON WATER AND FUEL.SPOT WSL SHACK. • 16:00 - 17:00 1.00 RIGU P PRE PJSM.RAISE AND PIN DERRICK. -BRIDLE DOWN. -R/U FLOOR.SPOT FUEL TRAILER. -RIG ACCEPTED @ 17:00 HRS,11/25/2014. 17:00 - 18:30 1.50 KILLW P DECOMP PJSM.R/U SURFACE LINES. -R/U KILL MANIFOLD. -SPOT SLOP TANK. 18:30 - 22:30 4.00 KILLW P DECOMP TAKE ON 9.8 PPG BRINE. -SPOT TIGER TANK,R/U HARD LINES. Printed 12/15/2014 3:02:10PM North America-ALASKA-BP Page 2 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/me:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. OM:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 23:00 0.50 KILLW P DECOMP-TRIG EVACUATION DRILL. -WELL BLOW OUT DRILL. -ALL CREW AND THIRD PARTY MEMBERS REPORTED TO THE PRIMARY MUSTER AREA IN A TIMELY MANNER. -AAR WITH RIG CREW,WSLAND ALL PERSONAL ON SITE. 23:00 - 00:00 1.00 KILLW P DECOMP PJSM.PRESSURE TEST SURFACE LINES. -PRESSURE TEST TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. 11/26/2014 00:00 - 00:30 0.50 KILLW P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS -CHECK CROWN-0-MATIC.GOOD. 00:30 - 04:00 3.50 KILLW P DECOMP PJSM.PRESSURE TEST SURFACE LINES. -CONTINUE PRESSURE TEST TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. 04.00 - 06:00 2.00 WHSUR P DECOMP 1 PJSM.PULL BPV. R/U WELL SUPPORT LUBRICATOR. -PRESSURE TEST LUBRICATOR TO 250 PSI LOW,3,500 PSI HIGH FOR 5 MINUTES.GOOD TEST. -PULL BPV. L/D LUBRICATOR.1,000 PSI SHUT IN TUBING + PRESSURE. Printed 12/15/2014 3:02:10PM • North America-ALASKA-BP Page 3 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UW:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:30 6.50 KILLW P DECOMP PJSM.PERFORM WELL KILL. -EMPHASIZE GOOD COMMUNICATION AND STOPPING THE JOB IF SOMETHING IS NOT RIGHT. REVIEW PRESSURE CROSS CHECK LIST. PRV ON PUMP SET FOR 4,200 PSI. -NOTIFY MILNE PT AND DRILL SITE OPERATOR OF GAS VENTING OPERATIONS. -BLEED GAS OFF TO FLOW BACK TANK BLEED FOR APPROXIMATELY 25 MINUTES, NO FLUID BACK. TUBING SHUT IN PRESSURE 700 PSI.LINE UP TO PUMP 9.8 PPG KWF DOWN TUBING. -PUMP DOWN TUBING AT 3 BPM,ICP=700 PSI,FCP=100 PSI,PUMPED 25 BBLS,TAKING 'RETURNS THROUGH CHOKE TO FLOWBACK TANK. -CLOSE IN CHOKE AND BULLHEAD 441 BBLS AT 7 BPM/1400 PSI.MONITOR 0/A THROUGHOUT OPERATION.325 PSI MAX. -MONITOR WELL FOR 10 MINUTES,SITP= 625 PSI,SICP=925 PSI. -CIRCULATE DOWN TUBING 40 BBLS DEEP CLEAN PILL FOLLOWED BY 214 BBLS 9.8 PPG BRINE AT 5 BPM. -TAKING RETURNS THROUGH CHOKE AND TO FLOW BACK TANK ICP=700 PSI,FCP= 125 PSI ON TUBING. -INTERMITTENT GAS IN RETURNS, PROBABLY FROM TUBING BELOW GLM AT 2,508' -I/A=900 PSI INITIALLY AND 100 PSI AFTER 214 BBLS CIRCULATED. -RECOVERED 120 BBLS FROM FLOW BACK TANK.SITP=200 PSI,I/A=475 PSI. -CIRCULATE 171 BBLS DOWN TUBING, TAKING RETURNS THROUGH CHOKE TO FLOW BACK TANK. -SHUT IN AND EMPTY FLOW BACK TANK,72 BBLS RECOVERED. (12)HOUR FLUID LOSS=121 BBLS 9.8 PPG BRINE. FLUID LOSS FROM BULLHEAD=441 BBLS 9.8 PPG BRINE. NO PUMP OPERATIONS WITH SLOW CIRCULATING RATES. 12:30 - 14:00 1.50 KILLW P DECOMP PTSM.LINE UP AND PUMP DOWN TUBING AT 5 BPM=690 PSI TAKING RETURNS THROUGH CHOKE TO FLOW BACK TANK -PUMP 85 BBLS.RETURNS ARE CLEAN AND GAS FREE.25 BBLS RETURNED TO FLOW BACK TANK.LOST 60 BBLS. -I/A AND TUBING ARE ON A VACUUM.BLOW DOWN LINES AND RIG UP TO FILL WELL, STATIC LOSS RATE=72 BPH. -CONSULT ODE AND DIRECTED TO FILL HOLE AT 30 BPH AS PER PROGRAM. Printed 12/15/2014 3:02:10PM North America-ALASKA-BP Page 4 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:OOAM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 16:00 2.00 WHSUR P DECOMP PJSM.SET TWC. -P/U WELL SUPPORT LUBRICATOR AND TEST TO 250 PSI LOW,3,500 PSI HIGH FOR 5 MINUTES.GOOD TEST. -SET TWC. -L/D LUBRICATOR. 16:00 - 17:00 1.00 WHSUR P DECOMP PJSM.PRESSURE TEST TWC. PERFORM ROLLING TEST FROM BELOW TWC,PUMP AT 5 BPM=300 PSI FOR 5 MINUTES. -PRESSURE TEST TWC FROM ABOVE TO 250 PSI LOW,3,500 PSI HIGH FOR 5 MINUTES. GOOD TEST. -DRAIN STACK,BLOW DOWN LINES. 17:00 - 19:30 2.50 WHSUR P DECOMP PJSM.N/D 2-9/16"TREE AND ADAPTER FLANGE. -DRAIN TREE OF FLUIDS. FMC REPRESENTATIVE BLEED VOID. -N/D ADAPTER FLANGE AND TREE. -CHECK THREADS ON HANGER 19:30 - 22:00 2.50 BOPSUR P DECOMP PJSM.N/U 13-5/8"FOUR PREVENTER BOPE. -R/U TURN BUCKLES AND RISER. -CONNECT ACCUMULATOR LINES,HOLE FILL LINE AND KILL LINE. 22:00 - 00:00 2.00 BOPSUR P DECOMP PJSM.TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 2-7/8"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST UPPER 2-7/8"X 5"VARIABLE RAMS WITH 2-7/8"AND 4"TEST JOINT TO 250 PSI, 3,500 PSI HIGH FOR 5 CHARTED MINUTES. (24)HOUR FLUID LOSS=370 BBLS 9.8 PPG BRINE. FLUID LOSS FROM BULLHEAD=441 BBLS 9.8 PPG BRINE. OA=200 PSI. NO PUMP OPERATIONS WITH SLOW CIRCULATING RATES. 11/27/2014 00:00 - 03:00 3.00 BOPSUR P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS -CHECK CROWN-O-MATIC.OK. PJSM.CONTINUE TEST FOUR PREVENTER 13-5/8"BOPE AND RELATED EQUIPMENT. -TEST LOWER 2-7/8"X 5"VARIABLE RAMS WITH 2-7/8"AND 4"TEST JOINT TO 250 PSI, 3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. -NO FAILURES,JOHNNIE HILL OF AOGCC WAIVED WITNESSING. 03:00 - 04:00 1.00 BOPSUR P DECOMP BLOW DOWN ALL SURFACE LINES. -DRAIN STACK AND GAS BUSTER. -R/D TEST EQUIPMENT. Printed 12/15/2014 3:02:10PM North America-ALASKA-BP Page 5 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:©63.40usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 06:30 2.50 BOPSUR P DECOMP PJSM.PULLTWC. -P/U OFF SET LUBRICATOR. -PRESSURE TEST TO 250 PSI LOW,3,500 PSI HIGH FOR 5 MINUTES.GOOD TEST. -PULL TWC. -R/D WELL SUPPORT LUBRICATOR. 06:30 - 08:00 1.50 PULL P DECOMP PJSM.MAKE UP LANDING JT TO HANGER. MAKE UP TOP DRIVE TO LANDING JT.BACK OUT LOCK DOWN SCREWS. -PULL HANGER OFF SEAT AND ESTABLISH TUBING IS FREE,93K UP WT. -SLACK OFF UNTIL HANGER IS ABOUT 3' FROM BEING LANDED. 08:00 - 08:30 0.50 PULL P DECOMP PJSM.CLOSE BAG AROUND LANDING JT. -LINE UP THRU CHOKE AND MUD GAS SEPARATOR. -CIRCULATE(50)BBLS THRU CHOKE TO PITS,6 BPM=730 PSI. -LOST 25 BBLS DURING THAT CIRCULATION. OPEN ANNULAR PREVENTER. -MONITOR WELL,ELECT TO CIRCULATE ANOTHER 68 BBLS AT 6 BPM=730 PSI,LOST 17 BBLS. -MONITOR WELL,FLUID SLOWLY DROPPING. 08:30 - 10:00 1.50 PULL P DECOMP PJSM.PULL HANGER TO FLOOR,LAY DOWN HANGER. -BLOW DOWN TOP DRIVE,MAKE UP SAFETY JT. -FILL HOLE WHILE DOING THIS AND ESTABLISH LOSS RATE. -LOSS RATE=37 BPH. -POOH,L/D(4)JTS AND GLM. 10:00 - 11:30 1.50 PULL P I DECOMP PJSM.HANG ESP SHEAVE AND TRUNK FOR ESP CABLE. -STRING ESP&HEAT TRACE THRU ESP SHEAVE. -CONTINUOUS HOLE FILL,LOSS RATE DROPPED TO 28 BPH. 11:30 - 12:00 0.50 PULL P DECOMP PJSM.POOH,STANDING BACK 2 7/8"EUE 8 ROUND TUBING. -SPOOLING UP ESP CABLE AND HEAT TRACE. -ACQUIRE SLOW CIRCULATING RATES. LOSSES TO WELL BORE LAST(12)HRS=335 1 BBLS OF 9.8 PPG BRINE. 0/A=160 PSI. 12:00 - 12:30 0.50 PULL P DECOMP SERVICE RIG AND INSPECT FLOOR EQUIPMENT. -CHECK PIT VOLUMES AND INSPECT PIPE ELEVATOR. _ -CHECK CROWN 0 MATIC,OK. 12'30 - 20:00 7.50 PULL P DECOMP PJSM.CONTINUE TO POOH AND STANDING BACK 2 7/8"EUE 8 RND TUBING. -SPOOLING ESP CABLE AND HEAT TRACE. -POOH FROM 9,343'MD TO 7,147'MD. -CONTINUOUS HOLE FILL,LOSS RATE=25 BPH. Printed 12/15/2014 3:02:10PM North America-ALASKA-BP Page 6 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date 12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor.DOYON DRILLING INC. UW:500292303800 Active datum:MPI-12:tt63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 20:30 0.50 PULL P DECOMP 1 PJSM.ATTEMPT TO CIRCULATE TUBING BELOW GLM. -R/U HEAD PIN TO 2-7/8"TUBING. -PUMP 1 BBL,PRESSURED UP TO 2,950 PSI. i-SHUT DOWN AND BLEED OFF PRESSURE. 20.30 - 00.00 3.50 PULL P DECOMP PJSM.CONTINUE TO POOH AND STANDING BACK 2 7/8"EUE 8 RND TUBING. -SPOOLING ESP CABLE AND HEAT TRACE. POOH FROM 7,147'MD TO 6,136'MD. -STAND BACK 37 STANDS IN DERRICK. -CONTINUOUS HOLE FILL,LOSS RATE=25 BPH. -NO PUMP OPERATIONS WITH SLOW CIRCULATING RATES. I LOSSES TO WELL BORE LAST(24)HRS=651 BBLS OF 9.8 PPG BRINE. __ O/A=140 PSI. 11/28/2014 00:00 00:30 0.50 PULL P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS -CHECK CROWN-O-MATIC.OK. 00:30 - 10:00 9.50 PULL P DECOMP 1 PJSM.CONTINUE TO POOH AND L/D 2 7/8" EUE 8 RND TUBING. -SPOOLING ESP CABLE TO SPOOLING UNIT. -POOH FROM 7,147'MD. -CONTINUOUS HOLE FILL,LOSS RATE=22 BPH. -POOH TO 122'&ESP ASSEMBLY. -MONITOR WELL,(10 MINUTES),LOSS RATE 22 BPH. 10:00 - 15:00 5.00 PULL P DECOMP PJSM.LAY DOWN ESP ASSEMBLY. -REMOVE CLAMPS FROM MOTOR ASSEMBLY,TERMINATE ESP CABLE. -BREAK DOWN&LAY DOWN MOTOR/PUMP ASSEMBLY. -RECOVERED(507)5'DUAL CLAMPS,(304)2' CANNON CLAMPS. I-RECOVERED(9)SINGLE CHANNEL CLAMPS, (4)BANDS AND(3)FLAT GUARDS. -CLEAR AND CLEAN RIG FLOOR. -R/D ELEPHANT TRUNK AND ESP SHEAVE. FLUID LOSS(12)HOURS=288 BBLS 9.8 PPG .BRINE. OA=160 PSI. 15:00 - 15:30 0.50 DHB P DECOMP PJSM.P/U 7"HES RBP. -M/U HES RBP RUNNING TOOL 15:30 - 16:00 0.50 DHB P DECOMP PJSM.SERVICE PIPE SKATE,TOP DRIVE AND RIG FLOOR EQUIPMENT. 16:00 - 00:00 8.00 DHB P i DECOMP PJSM.RIH WITH 7"HES RBP. M/U 7"HES RBP. I-RIH ON 4"DRILL PIPE FROM SHED. -RIH FROM SURFACE TO 5,229'MD.PUW= l 90K,SOW=69K. FLUID LOSS(24)HOURS=515 BBLS 9.8 PPG BRINE.LOSS RATE=20 BPH. OA=120 PSI. 11/29/2014 00:00 - 00:30 0.50 DHB P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS -CHECK CROWN-O-MATIC.OK. Printed 12/15/2014 3:02:10PM • North America-ALASKA-BP Page 7 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud DateTme:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (usft) 00:30 - 02:00 1.50 DHB P DECOMP PJSM.RIH WITH 7"HES RBP. -RIH ON 4"DRILL PIPE FROM SHED. RIH FROM 5,229'MD TO 6,014'MD.PUW= 96K,SOW=70K. -ACQUIRE SLOW CIRCULATING RATES. 02:00 - 03:00 1.00 DHB P DECOMP PJSM.TROUBLE SHOOT AND SERVICE TOP DRIVE. 03:00 - 04:30 1.50 DHB P DECOMP PJSM.SET 7"HES RBP. -SET RBP AT 6,014'MD.SET DOWN 15K,RBP SET. -ATTEMPT TO PRESSURE TEST RBP TO 250 PSI LOW,2,000 PSI HIGH.UNSUCCESSFUL. -CHECK ALL SURFACE LINES AND EQUIPMENT,ALL GOOD. 04:30 - 06:001.50 DHB N RREP DECOMP TROUBLE SHOOT TOP DRIVE. -GRABBER SYSTEM NOT ALLOWING TOP DRIVE TO BREAK OUT. -HAVING TO ENGAGE MANUALLY. 06:00 - 07:30 1.50 DHB P DECOMP PJSM.OPTTO PUMP TO ENSURE ALLAIR IS OUT OF SYSTEM. -BREAK CIRCULATION,CIRCULATE BOTTOMS UP AT 7 BPM=1,050 PSI. SHUT DOWN PUMP,CLOSE UPPER PIPE -RAMS AND RIG UP TO TEST. ;-TEST 7"CASING FROM TOP OF BRIDGE PLUG AT 6,014'TO SURFACE. -TEST AT 250 PSI FOR 5 MIN,OK.TEST AT 12000 PSI AT 5 MIN,GOOD TEST. -0/A MONITORED THROUGHOUT,NO INDICATION OF COMMUNICATION. -BLEED ALL PRESSURE,OPEN PIPE RAMS, RIG DOWN TEST EQUIPMENT. 07:30 - 09:00 1.50 DHB P.. DECOMP PJSM.SLIP AND CUT 74'OF DRILLING LINE. -CHECK CROWN 0 MATIC,OK. 09:00 - 11:00 2.00 DHB P DECOMP PJSM.POOH WITH 4"DRILL PIPE FROM 5,956' MT TO 2,165'MD. -PUW=68K,SOW=69K. 11:00 - 12:00 1.00 DHB P DECOMP RIG HANDS NOTICED BAD SPOT IN DRILLING LINE,VERY GOOD CATCH. -PJSM.SLIP AND CUT 61'OF DRILLING LINE. -ACQUIRE SLOW CIRCULATING RATES. LOSSES TO WELL BORE LAST(12)HOURS= 66 BBLS OF 9.8 PPG BRINE. 12:00 - 12:30 0.50 DNB P DECOMP SERVICE RIG,INSPECT FLOOR EQUIPMENT 1 AND PIPE SKATE. -CHECK CROW 0 MATIC,OK. 12:30 - 14:30 2.00 DHB P DECOMP PJSM.PICKUP AND MAKE UP HALLIBURTON 7"26#RTTS. -RIH TO 96'&SET AS PER HALLIBURTON, 'HANGING OFF DRILL PIPE. -STAND BACK(1)STAND AND LAY DOWN RUNNING TOOL. -FILL HOLE,CLOSE BLIND RAMS AND TEST TOP OF RTTS @ 250/3500 PSI,5 MIN EACH/ CHARTED/GOOD TESTS. -RIG DOWN TEST EQUIPMENT,DRAIN (STACK Printed 12/15/2014 3:02:10PM • North America-ALASKA-BP Page 8 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor.DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:©63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 14:30 - 17:00 2.50 BOPSUR P DECOMP PJSM.NIPPLE DOWN 13 5/8"5M BOPE AND NIPPLE UP TC SPOOL. '-R/D RISER,TURN BUCKLES,MOUSE HOLE 'AND KOOMEY LINES. -N/D BOP AND SECURE ON STUMP. -N/U TC SPOOL AND FUNCTION LDS,AS PER CAMERON REP. 17:00 - 19:00 2.00 BOPSUR P DECOMP -PJSM.NIPPLE UP 13-5/8"5M BOPE. -N/U BOPE. -R/U RISER,TURN BUCKLES,MOUSE HOLE AND KOOMEY LINES. -ENERGIZE KOOMEY. 19:00 - 19:30 0.50 BOPSUR P DECOMP PJSM.TEST BREAKS. -FILL UP BOPE STACK. -TEST TC ATTACHMENT.BREAKS TO 250 PSI LOW,3,500 PSI HIGH.GOOD TEST. 19:30 - 20:00 0.50 BOPSUR P DECOMP ;PJSM.RIH TO RETRIEVE 7"STORM PACKER. -INSTALL WEAR RING,ID=7". -RIH AND RETRIEVE RTTS. POOH AND L/D RTTS. 20:00 - 22:00 2.00 BOPSUR P DECOMP PJSM.RIH WITH 4"DP FROM DERRICK. -RIH TO 6,014'MD.PUW=93K,SOW=68K. 22:00 - 23:00 1.00 BOPSUR P DECOMP PJSM.CIRCULATE 9.8 PPG HI-VIS BRINE. -ACQUIRE SLOW CIRCULATING RATES. _-DISPLACE WELL WITH 196 BBLS. 23:00 - 23:30 0.50 BOPSUR P DECOMP PJSM.RELEASE RBP AS PER HES I REPRESENTATIVE. -VERIFY IA ON A VACUUM. 23:30 - 00:00 0.50 BOPSUR P DECOMP BULLHEAD 550 BBLS 9.8 PPG HI-VIS BRINE. PUMP AT 7 BPM=770 PSI. LOSSES TO WELL BORE LAST(24)HOURS= 66 BBLS OF 9.8 PPG BRINE. OA=200 PSI. 11/30/2014 00:00 - 01:30 - 1.50 CLEAN P DECOMP CONTINUE BULLHEAD 550 BBLS 9.8 PPG HI-VIS BRINE. -PUMP AT 7 BPM=770 PSI,FCP=930 PSI. 101:30 - 02:00 0.50 CLEAN P DECOMP MONITOR WELL FOR(30)MINUTES.STATIC. 02:00 - 03:30 1.50 CLEAN P DECOMP PJSM.POOH WITH 7"HES RBP. -BLOW DOWN TOP DRIVE AND KILL LINE. -POOH FROM 5,482'MD TO 5,197'MD(5) STANDS,HOLE FILL OFF 1.5 BBLS. -BRINE IS VERY THICK AND BRIDGE PLUG IS CLOSE TO ID OF 7"CASING. SHUT DOWN,MONITOR WELL,WELL IS STABLE. 03.30 - 04 30 1.00 CLEAN P DECOMP PJSM.PUMP OUT OF HOLE FROM 5,482'MD TO 5,197'MD. -PUMPING AT 2.5 BPM=660 PSI,15 BBLS I LOST TO FORMATION. 04:30 - 05:30 1.00 CLEAN P DECOMP ,VOLUME IN PITS DOWN,STOP OPS AND TAKE ON VISCOSIFIED BRINE. -MONITOR WELL WHILE TAKING ON BRINE. -WELL IS STABLE,SLIGHT DROP IN FLUID LEVEL WHILE TAKING ON BRINE. Printed 12/15/2014 3:02:10PM North America-ALASKA-BP Page 9 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 10:00 4.50 CLEAN P DECOMP PJSM.CONTINUE TO PUMP OUT OF HOLE, PUMP AT 2.5 BPM=650 PSI WHILE PULLING PIPE. -POOH FROM 5,197'MD TO 3,017'MD.(55 BBLS LOST TO FORMATION). -ACQUIRE SLOW CIRCULATING RATES. 10:00 - 12:00 2.00 CLEAN P DECOMP PJSM.BLOW DOWN TOP DRIVE AND PULL PIPE ON ELEVATORS. -POOH FROM 3,017'MD TO SURFACE.CHECK HOLE FILL EVERY 5 STANDS. -WELL TAKING ALMOST(1)BBL OVER CALCULATED DISPLACEMENT EVERY(5) STANDS. 'LOSSES TO WELL BORE LAST(12)HOURS, (ASIDE FROM BULLHEAD OPERATION),=168 BBLS. 0/A=160 PSI. 12:00 - 13:00 1.00 CLEAN P DECOMP PJSM.BREAK DOWN AND LAY DOWN HALLIBURTON BRIDGE PLUG RETRIEVING TOOL. -BREAK DOWN SAFETY JT,RACK BACK LAST STAND. 13:00 - 14:30 1.50 CLEAN P DECOMP PJSM.CLEAR AND CLEAN RIG FLOOR. -MOBILIZE TOOLS AND CROSSOVERS FOR CLEAN OUT RUN. -MAKE UP FLOOR VALVE X/O AND MAKE UP BULL NOSE ASSEMBLY. 14:30 - 00:00 9.50 ' CLEAN P DECOMP 1PJSM.M/U AND RIH WITH 2-7/8"7.8#FOX TUBING AND 2-7/8"6.5#8RD EUE. -RIH FROM SURFACE TO 3,152'MD WITH 2-7/8"7.8#FOX TUBING. -RIH FROM 3,152'MD TO 4,691'MD WITH 2-7/8"6.5#8RD EUE.PUW=57K,SOW=48K. LOSSES TO WELL BORE LAST(24)HOURS= 192 BBLS. 0/A=150 PSI. 12/1/2014 00:00 - 00:30 0.50 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS -CHECK CROWN-O-MATIC.OK. 00:30 - 04:00 3.50 CLEAN P DECOMP PJSM.RIH WITH 2-7/8"6.5#8RD EUE AND 4" DRILL PIPE. -RIH FROM 4,691'MD TO 6,939'MD WITH 2-7/8"6.5#8RD EUE. -RIH FROM 6,939'MD TO 9,855'MD WITH 4" DRILL PIPE. -ACQUIRE SLOW CIRCULATING RATES AT 9,855'MD USING 9.8 PPG BRINE. 04:00 - 07:30 3.50 CLEAN P DECOMP WASH DOWN WITH 4"DRILL PIPE. -TAG FILL AT 9,855'MD,WASH DOWN TO 10,049'MD. -PUMP AT 7 BPM=1,720 PSI. -UP WT=93K,DOWN WT=64K. WASH STANDS DOWN TO 11,024'.LOSSES EXTREME. -150 BBLS LEFT IN THE PITS,(3)TRUCKS HAULING,LOSS RATE PUMPING OFF BOTTOM @ 2 BPM=94 BPH. Printed 12/15/2014 3:02:10PM • North America-ALASKA-BP Page 10 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:t 63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 07:30 - 12:00 4.50 CLEAN N DPRB DECOMP CALL TOWN,DECISION MADE TO KEEP GOING AS WE HAVE BEEN. I-CIRCULATE 60'OFF TOP OF FILL,1 BPM� 1300 PSI,VERY LITTLE RETURNS. -WAIT ON BRINE FROM 38 BPH LOSS RATE W/WAITING. -0/A=160 PSI,LOSSES LAST(12)HRS=750 BBLS OF 9.8 PPG VISCOSIFIED BRINE. 12:00 - 14:00 2.00 CLEAN N DPRB DECOMP PJSM.CONTINUE TO CIRCULATE AT 10,964', MQ. -WAIT ON BRINE AND GET ANOTHER TRUCK HAULING. 14:00 - 18:30 4.50 CLEAN P DECOMP PJSM.PITS FULL AND(1)TRUCK RIGGED UP DIRECTLY TO MUD PUMP. -CONTINUE WASHING DOWN FROM 11,024', WT TRANSFER GETTING SKETCHY. -VARY PUMP RATES TO WASH DOWN, I STACKING WT FROM TIME TO TIME. I-LOSS RATE VARIES WITH PUMP RATE. -WASH DOWN PUMPING AT 2-6 BPM= 750-2,150 PSI. WASH DOWN TO 12,045'MD,COULD NOT GO FURTHER.PUW=115K,SOW=45K. -MONITOR WELL FOR(10)MINUTES.STATIC. 18:30 - 22:00 3.50 CLEAN P DECOMP PJSM.POOH WITH CLEAN OUT STRING. !-PUMP OUT OF HOLE FROM 10,045'MD TO 19,861'MD.STANDING BACK DP IN DERRICK -PUMP AT 2 BPM=1,200 PSI. -ACQUIRE SLOW CIRCULATING RATES. 22.00 - 23 30 1.50 CLEAN P DECOMP PJSM.SLIP AND CUT DRILL LINE. -CLEAR AND CLEAN RIG FLOOR. -CUT 60'OF DRILL LINE. 23.30 - 00:00 0.50 CLEAN P DECOMP PJSM.CONTINUE POOH WITH CLEAN OUT STRING. -PULLING OUT WET,MUST PUMP OUT OF HOLE. -POOH FROM 9,861'MD TO 9,672'MD.PUW= 105K,SOW=65K.L/D DP 1 X 1 TO SHED. !-O/A=160 PSI,LOSSES LAST(24)HRS= 1,135 BBLS OF 9.8 PPG VISCOSIFIED BRINE. 12/2/2014 00:00 - 00:30 0.50 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS I � j -CHECK CROWN-O-MATIC.OK. 00:30 - 06:00 5.50 CLEAN P DECOMP PJSM.CONTINUE POOH WITH CLEAN OUT STRING. -PULLING OUT WET,MUST PUMP OUT OF HOLE. -POOH FROM 9,672'MD TO 7,200'MD. -PUMPING OUT OF HOLE AS BRINE IS VERY VISCOUS AND WILL NOT FALL IN DRILL PIPE/ TUBING. I-IF WE PULL W/O PUMPING,HOLE FILL IS LESS THAN IT SHOULD BE.ODE NOTIFIED. PUMP 25 BBLS 11.1 PPG DRY JOB.STILL PULLING WET. -CONTINUE TO PUMP OUT OF HOLE. Printed 12/15/2014 3:02:10PM North America-ALASKA-BP Page 11 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) _ 06:00 - 08:30 2.50 CLEAN P DECOMP PIPE STARTED PULLING DRY. -DOUBLE CHECK HOLE FILL AFTER PULLING ,(10)JTS,HOLE FILL CORRECT. CONTINUE TO POOH AND LAY DOWN 4" DRILL PIPE. -CHANGE OUT ELEVATORS. 08:30 - 12:00 3.50 CLEAN P DECOMP PJSM.POOH AND LAY DOWN 2-7/8"EUE 8RD TUBING. -POOH FROM 6,539'MD TO 4,139'MD.PUW= 60K,SOW=50K -CONTINUOUS HOLE FILL,LOSING A VERY SLIGHT AMOUNT OF FLUID,(DISPLACEMENT IS 0.2 BBLS OVER CALCULATED WI 30 JTS OUT). FLUID LOSS(12)HOURS=68 BBLS 9.8 PPG BRINE. _ OA=160 PSI. 12:00 - 12:30 0.50 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS -CHECK CROWN-O-MATIC.OK. 12:30 - 16:30 4.00 CLEAN P DECOMP PJSM.CONTINUE POOH WITH AND LAY DOWN 2-7/8"EUE 8RD TUBING. POOH FROM 4,139'MD TO 3,100'MD.PUW= 59K,SOW=51K. -POOH AND LAY DOWN 2-7/8"FOX TUBING. -POOH FROM 3,100'MD TO SURFACE. 16:30 - 18:00 1.50 CLEAN P DECOMP PJSM.RIH WTH 4"DP STANDS FROM DERRICK. -RIH FROM SURFACE TO 914'MD. 18:00 - 21:00 3.00 CLEAN P l DECOMP ,PJSM.POOH AND LAY DOWN 4"DP TO SHED. -POOH FROM 914'MD TO SURFACE. 21:00 - 22:30 1.50 CLEAN P DECOMP CLEAR ND CLEAN RIG FLOOR,IRON ROUGHNECK,TONGS,SLIPS AND ELEVATORS. -PULL WEAR RING. 22:30 - 00:00 1.50 RUNCOM P RUNCMP PJSM.R/U TO RUN ESP COMPLETION. M/U FLOOR VALVE. -CHANGE OUT SLIPS/ELEVATORS. -P/U CENTRILIFT TOOLS TO RIG FLOOR. -HANG ESP SHEAVE IN DERRICK I FLUID LOSS(24)HOURS=98 BBLS 9.8 PPG BRINE. OA=150 PSI. 12/3/2014 00 00 - 01:30 1.50 RUNCOM P RUNCMP 1 PTSM.PULL MOTOR LEAD ESP TO RIG FLOOR. 01:30 - 08:00 6.50 RUNCOM P RUNCMP PJSM.P/U AND SERVICE ESP MOTOR ASSEMBLY. -M/U RECEIVING ASSEMBLY. -INSTALL MOTOR LEAD TO MOTOR/SEAL ASSEMBLY. 08:00 - 10:00 2.00 RUNCOM N WAIT RUNCMP WAIT ON CENTRILIFT FOR FLAT GUARDS. 10:00 - 11:00 1.00 RUNCOM N SFAL RUNCMP PJSM.REMOVE PROTECTOLIZERS AND INSTALL CANNON CLAMPS ONLY ON MOTOR/SEAL ASSEMBLY. Printed 12/15/2014 3:02:10PM North America-ALASKA-BP Page 12 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 RUNCOM P RUNCMP CENTRILIFT TERMINATE I-WIRE AND TEST. FLUID LOSS(12)HOURS=21 BBLS 9.8 PPG BRINE. OA=160 PSI. 12:00 - 13:30 1.50 RUNCOM P RUNCMP PJSM.PRESSURE TEST TECH WIRE TO 5,000 PSI.GOOD TEST. -PERFORM CONDUCTIVITY TEST ON ESP CABLE.GOOD. 13:30 - 15:00 1.50 RUNCOM P RUNCMP PJSM.RIH WITH 3-1/2"9.3#L-80 EUE 8RD ESP COMPLETION. -USING BEST-O-LIFE 2000 PIPE DOPE. -TORQUING EACH CONNECTION TO 2,550 FT-LBS. FILLING TUBING EVERY 15 JOINTS. -RIH FROM SURFACE TO 1,000'MD. -CHECK CONDUCTIVITY -1,000'MD. 15:00 - 15:30 0.50 RUNCOM P RUNCMP PJSM.CIRCULATE TUBING WITH 9.8 PPG BRINE.(NON-VIS) R/U HEAD PIN. -PUMP 9.8 PPG BRINE DOWN TUBING. -ACQUIRE SLOW CIRCULATING RATES. -PERFORM CONDUCTIVITY TEST ON ESP CABLE.GOOD. 15:30 - 22:00 6.50 RUNCOM P RUNCMP PJSM.R/U SWS SLICKLINE AND EQUIPMENT TO INSTALL TTC-ESPCP. -RUN#1:TTC-ESPCP. -RUN#2:D&D PACKOFF ASSEMBLY. -RUN#3:INSTALL PRESSURE TEST TOOL. -PRESSURE TEST TO 250 PSI LOW,1,000 PSI HIGH FOR 15 CHARTED MINUTES.GOOD TEST. -RUN#4:RETRIEVE PRESSURE TEST TOOL. -RUN#5:RUN D&D TUBING STOP ASSEMBLY. 22:00 - 00:00 2.00 RUNCOM P RUNCMP PJSM.RIH WITH 3-1/2"9.3#L-80 EUE 8RD ESP COMPLETION. -USING BEST-O-LIFE 2000 PIPE DOPE. -TORQUING EACH CONNECTION TO 2,550 FT-LBS. -FILLING TUBING EVERY 15 JOINTS. -CHECKING CONDUCTIVITY EVERY-2,000' MD. -RIH FROM 1,000'MD TO 2,247'MD.PUW= 60K,SOW=56K. -NO OPERATIONS WITH SLOW CIRCULATING RATES.CAN NOT PUMP THROUGH ESPCP. FLUID LOSS(24)HOURS=21 BBLS 9.8 PPG BRINE. OA=150 PSI. 12/4/2014 00:00 - 00:30 0.50 RUNCOM P RUNCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS -CHECK CROWN-O-MATIC.OK. Printed 12/15/2014 3:02:10PM • North America-ALA ma Page 13 of 15 row Operation Summary Report 4 � Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date.11/24/2014 End Date:12/5/2014 X4-010Q5-E.(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00.00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum.MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00.30 - 10:30 10.00 RUNCOM P RUNCMP PJSM.RIH WITH 3-1/2"9.3#L-80 EUE 8RD ESP COMPLETION. -USING BEST-O-LIFE 2000 PIPE DOPE. -TORQUING EACH CONNECTION TO 2,550 FT-LBS. -FILLING TUBING EVERY 15 JOINTS. CHECKING CONDUCTIVITY EVERY-2,000' MD. -RIH FROM 2,247'MD TO 7,368'MD. 10:30 - 12:00 1.50 RUNCOM P RUNCMP CENTRILIFT PERFORM CONDUCTIVITY TEST. -PERFORM REEL TO REEL SPLICE. -NO OPERATIONS WITH SLOW CIRCULATION RATES. FLUID LOSS(12)HOURS=65 BBLS 9.8 PPG BRINE. OA=160 PSI. 12:00 - 15:00 3.00 RUNCOM P RUNCMP CENTRILIFT CONTINUE REEL TO REEL SPLICE. 15:00 - 16:00 1.00 RUNCOM P RUNCMP PJSM.RIH WITH 3-1/2"9.3#L-80 EUE BRD ESP COMPLETION. USING BEST-O-LIFE 2000 PIPE DOPE. -TORQUING EACH CONNECTION TO 2,550 FT-LBS. -FILLING TUBING EVERY 15 JOINTS. -CHECKING CONDUCTIVITY EVERY-2,000' MD. -RIH FROM 7,368'MD TO 7,987'MD. 16:00 - 20:00 4.00 RUNCOM N HMAN , RUNCMP CENTRILIFT PERFORM CONDUCTIVITY TEST. -PERFORM REEL TO REEL SPLICE. 20:00 - 22:00 2.00 RUNCOM P RUNCMP PJSM.RIH WITH 3-1/2"9.3#L-80 EUE 8RD ESP COMPLETION. USING BEST-O-LIFE 2000 PIPE DOPE. -TORQUING EACH CONNECTION TO 2,550 FT-LBS. -FILLING TUBING EVERY 15 JOINTS. -CHECKING CONDUCTIVITY EVERY-2,000' MD. -RIH FROM 7,987'MD TO 9,551'MD.PUW= 103K,SOW=50K. 22.00 - 00:00 2.00 RUNCOM P RUNCMP PJSM.TERMINATE ESP CABLE AT HANGER. -P/U LANDING JOINT AND MAKE UP TO HANGER. -INSTALL PENETRATOR AND TERMINATE ESP CABLE. -PULL REMAINING ESP CABLE BACK TO SPOOLING UNIT. -R/D ESP SHEAVE. FLUID LOSS(24)HOURS=38 BBLS 9.8 PPG BRINE. OA=150 PSI. 12/5/2014 00:00 - 01:30 1.50 RUNCOM P RUNCMP PTSM.CONTINUE TERMINATE ESP CABLE AT HANGER. -CLEAR AND CLEAN RIG FLOOR. 01.30 - 02:30 1.00 RUNCOM P RUNCMP PJSM.LAND TTC-ESPCP COMPLETION. -FINAL PUW=107K,SOW=57K. -FMC REPRESENTATIVE RILDS. -L/D LANDING JOINT. 02:30 - 03:00 0.50 BOPSUR P RUNCMP PJSM.INSTALL TWC. -DRY ROD IN TWC. Printed 12/15/2014 3:02:10PM • North America-ALASKA-BP Page 14 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project:Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:©63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 03:30 0.50 BOPSUR P RUNCMP PRESSURE TEST TWC. -PERFORM ROLLING TEST FROM BELOW TO 500 PSI FOR 5 CHARTED MINUTES.GOOD TEST. PRESSURE TEST FROM ABOVE TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES.GOOD TEST. 03:30 - 08:00 4.50 BOPSUR P RUNCMP PJSM.R/D SURFACE EQUIPMENT. -CLEAN ALL RIG FLOOR EQUIPMENT AND HANDLING EQUIPMENT OF BRINE RESIDUE. -FLUSH KILL,CHOKE,CHOKE MANIFOLD AND TOP DRIVE WITH FRESH WATER. -FUNCTION ALL RAMS AND WASH DOWN. -VACUUM OUT STACK. -N/D RISER AND MOUSE HOLE. 08:00 - 09:30 1.50 BOPSUR P RUNCMP PJSM.N/D 13-5/8"FOUR PREVENTER BOPE. -REMOVE ACCUMULATOR LINES,CHOKE AND KILL LINES. -SET BACK BOPE ON STUMP. 09:30 - 12:00 2.50 WHSUR P RUNCMP N/U TUBING HEAD ADAPTER AND TREE. -FMC TEST VOID TO 250 PSI LOW,5,000 PSI HIGH FOR 30 MINUTES.GOOD TEST. CENTRILIFT PERFORM FINAL CHECKS ON ESP CABLE.GOOD TEST. FLUID LOSS(12)HOURS=0 BBLS 9.8 PPG BRINE. OA=160 PSI. 12:00 - 16:00 4.00 WHSUR P RUNCMP PJSM.PULL TWC AND INSTALL BPV. -R/U TEST EQUIPMENT AND LUBRICATOR TO TREE. -PRESSURE TEST LUBRICATOR AND TREE TO 250 PSI LOW,5,000 PSI HIGH FOR 5 MINUTES.GOOD TEST. -PULL TWC. -PRESSURE TEST LUBRICATOR TO 250 PSI LOW,3,500 PSI HIGH FOR 5 MINUTES.GOOD TEST. -SET BPV. R/D LUBRICATOR. 16:00 - 18:00 2.00 WHSUR P RUNCMP PJSM.FREEZE PROTECT WELL WITH LRS. -R/U LRS AND PRESSURE TEST LINES TO 250 PSI LOW,3,500 PSI HIGH.GOOD TEST. -CIRCULATE DOWN TUBING AT 1 BPM=600 PSI. -NOTED CRUDE AT SLOP TANK AFTER-5 BBLS PUMPED AWAY.RECOVERED-85 BBLS OF CRUDE IN SLOP TANK. -PERFORM ROLLING TEST FROM BELOW BPV AT 500 PSI FOR 10 MINUTES.GOOD TEST. Printed 12/15/2014 3:02:10PM North America-ALASKA-BP Page 15 of 15 Operation Summary Report Common Well Name:MPI-12 AFE No Event Type:WORKOVER(WO) Start Date:11/24/2014 End Date:12/5/2014 X4-010Q5-E:(1,200,000.00) Project Milne Point Site:M Pt I Pad Rig Name/No.:DOYON 16 Spud Date/Time:10/7/2001 12:00:00AM Rig Release:12/5/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292303800 Active datum:MPI-12:@63.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 21:00 3.00 WHSUR P RUNCMP PJSM.LOWER DERRICK. BRIDLE UP BLOCKS AND READY FLOOR FOR RIG MOVE. -SECURE RIG FLOOR,LOWER CATTLE CHUTE. -UNPIN AND LOWER DERRICK ONTO DERRICK STAND. -MOVE CREW TRAILER AND SLOP TANK -RAISE CELLAR DOORS. RELEASE DOYON 16 FROM MPI-12 AT 21:00 HRS ON 12/5/2014 FOR MOVE TO DS 15-24. Printed 12/15/2014 3:02:10PM M' Milne Point Unit Well: MPU I-12L1 11 SCHEMATIC Last Completed: 12/5/2014 Hamill:tiaska.i.ii: PTD: 201-164 CASING DETAIL Size Type Wt/Grade/Conn Drift ID Top Btm RKB Elev=64.7' 20" Conductor 92/H-40/Welded N/A Surf 108' 10-3/4" _ Surface 45.5/L-80/Btrc. 9.794 Surf 2,906' j ,,, 7" _ Intermediate _ 26/L-80/Btc-Mod 6.151 Surface 10,228' s;, ' ' 4-1/2" Liner"A" _ 12.6/L-80/IBT 3.833 9,936' 12,393' 20 fro 4-1/2" Liner"B" 12.6/L-80/IBT 3.833 10,164' 12,396' ' • 1 TUBING DETAIL 3; 3-1/2" Tubing 9.3/L-80/EUE 8rd I 2.867 I Surf 9,582' LINER DETAIL f 4-1/2" OA Solid Liner 12.6/L-80/IBT 3.833 9,936' 9,980' 4-1/2" OA Slotted Lnr 12.6/L-80/IBT 3.833 9,980' 12,393' 2 4-1/2" OB Solid Liner 12.6/L-80/IBT 3.833 10,164' 10,373' • 4-1/2" OB Slotted Lnr 12.6/L-80/IBT 3.833 10,373' 12,396' 10-3/4"y JEWELRY DETAIL No Depth Item 1 201' GLM 3.5"x 1"Camco KBMG w/Orifice Valve&BK Latch 2 2,485' GLM 3.5"x 1"Camco KBMG w/Open/Empty Pocket 3 9,493' 3.5"Well Lift Discharge Gauge Unit _ _ 4 9,555' Tandem Seal Section 5 9,570' Motor 562MSP1,84hp,2,210 v/23 amp 6 9,579' Well lift MGU Gauge 7 9,581' Centralizer-Bottom @ 9,582' 8 9,627' Baker Hook Wall,Hanger above 7"Window 9 9,642' Baker Hook Wall,Hanger below 7"Window 10 9,650' Baker Tension Lock Swivel 11 9,906' Baker Tie Back Sleeve 12 9,928' Baker ZXP Liner Top Packer 13 9,930' Baker 7"x 5"HMC Liner Hanger 14 10,116' Btm 4-1/2"Pack-off Bushing 15 10,128' Btm 4-1/2"Guide Shoe 16 10,147' Btm Baker Pack-off Bushing 17 12,395' Btm Baker 4-1/2"Guide Shoe In 3 LATERAL WINDOW DETAIL I Top of"OA"Window @ 9,916'MD;Bottom @ 9,928'MD;Angle @ top of window is 8odeg Top of"OB"Window @ 10,228'MD;Bottom @ 10,240'MD;Angle @ top of window is 87 deg ii WELL INCLINATION DETAIL j.4 KOP @ 300'MD � Max Wellbore Angle=85.5 deg @ 8,102'MD '% 63.74 deg @2,550'MD • 5 OPEN HOLE/CEMENT DETAIL 6 20" Cmt w/650 sx of Arcticset I in 30"Hole ,'a a 7 '" 10-4/4" Cmt w/585 sx AS Lite,502 sx Class"G"in 13-1/2"Hole 3 7" Cmt w/1,172 sx Class"G"in 9-7/8"Hole ,M WELLHEAD j FMC Tubing Hanger,11"x 4-1/2"TC-II Top& Wellhead I Bottom '1 GENERAL WELL INFO API:50-029-23038-60-00 6 Drilled and Cased by Nabors 4-ES -12/8/2001 . 99 ;t; 10o 14 NOTES: a Need Cementing Report to Establish Tops *;: "OA Lateral 15 12 { 11 rc,.a6.44! Need Casing&Tubing Tallies I: 13 I "COLateral 17 7" _ TD=12,470'(MD)/TD=3,712'(1VD) PBTD=12,470'(MD)/PBTD=3,712'(TVD) Created By:TDF 12/19/2014 STATE OF ALASKA ALAS~IL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERA ONS 1. Operations Performed: ^ Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ®Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension Replace failed ESP 2. Operator Name: 4. Well Class Before Work: 5. Permit TQ Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory ~ 201-164 3. Address: ^ Service ^ Stratigraphic 6. API Number. P.O. Box 196612, Anchorage, Alaska 99519-6612 ~ 50-029-23038-60-00 7. Property Designation: ~ 8. Welt Name and Number. \ ADL # 025906 & 025517 MPI-12L1 9. Field /Pool(s): Milne Point Unit / Schrader Bluff 10. Present well condition summary Total depth: measured 12500 feet true vertical 3631 feet Plugs (measured) None Effective depth: measured 12500 feet Junk (measured) None true vertical 3631 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 79' 20" 108' 108' 1490 470 Surface 2878' 10-3/4" 2906' 2408' 5210 2480 Intermediate gggg~ 7" 9916' 3650' 7240 5410 Production Liner 2530' 4-1/2" 9907' - 12437' 3648' -3635' 8430 7500 ~ ~ ~s• ~~~ Ks', 't ~;-{ .~ zi sW r, ytjt Perforation Depth: Measured Depth: 9981' - 12394' True Vertical Depth: 3658' - 3638' Tubing (size, grade, measured and true vertical depth): 2-7/8", 6.5# L-80 9654' 3599' Packers and SSSV (type, measured and true vertical depth): None ~~~ /~~""! V V 11. Stimulation or cement squeeze summary: ~ ~ ~ ~ ~ Intervals treated (measured): ~ ~,„J ~ C~"~~ ~~t-mission Treatment description including volumes used and final pressure: d~I8Sk8 (~ ~t v8~ i+i1C~t~JT 3~ 12, Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 13. Attachments: ^ Copies of Logs and Surveys run 14. Well Class after work: ^ Exploratory ®Development ^ Service ort of Well O erations ® Dail Re y p p ® Well Schematic Diagram 15. Well Status after work: ®Oil ^ Gas ^ WDSPL ^ GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG 16. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Mackie Derrick, 564-5891 N/A Printed Name Terrie Hubble Title Drilling Technologist Signature Prepared By Name/Number. Phone 564-4628 Date ~ ~ d Terrie Hubble, 564-4628 Form 10-404 Revised 07/2009 RB~MS `f'~ A o Submit Original Only f1 1Yh7 JU ~r v ~r2 ~ /CJ • North America -ALASKA - BP Page 1 of 1 Operation Summary Report -___ Common Well Name: MPI-12 DIMS AFE No Event Type: MOBILIZATION (MOB) Start Date: 6/23/2010 End Date: X4-0009D-E (75,000.00 ) Project: Milne Point Site: M Pt 1 Pad Rig Name/No.: NABORS 4ES Spud Date~me: 10/7/2001 12:0O:OOAM Rig Release: 6/30/2010 Rig Contractor. NABORS ALASKA DRILLING INC. UWI: Active Datum: MPI-12: @63.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 6/24/2010 02:00 - 05:30 3.50 MOB P PRE PREP RIG FOR MOVE TO MP I-12. SCOPE AND LD DERRICK, RD LINES ON PITS 05:30 - 07:30 2.00 MOB N WAIT PRE WAIT ON TRUCKS. -PEAKS DRIVERS WERE TIMED OUT. -HAD TO WAIT FOR THEM TO GET SOME SLEEP BEFORE RIG MOVE COULD START. 07:30 - 09:30 2.00 MOB P PRE ' RDMO TO MPI-12 -SUB BASE WAS PULLED OFF OF WELL AT Ot3:45 -RIG WAS OFF OF LOCATION AT 09:30 09:30 - 10:00 0.50 MOB P PRE MOVE RIG ALONG MPS PAD ACCESS RD TO MILNE POINT SPINE RD. 10:00 - 11:00 1.00 MOB N WAIT PRE WAIT AT INTERSECTION OF MPS PAD ACCESS RD AND MILNE POINTSPINE RD. -MPU CALLED AND ASKED US TO HOLD THERE UNTIL THEY: CALLED. THEY WERE STARTING A TURBINE AND WANTED THE ROAD CLEAR IN CASE OF EMERGENCY. 11:00 - 16:00 5.00 MOB P PRE CONTINUE TO MOVE RIG TO MPI PAD. =RIG ON MPI PAD AT 16:00. 16:00 - 18:00 2.00 MOB P PRE SPOT SUB ON WELL USING ONE LAYER OF MATTING BOARDS. 18:00 - 21:00 3.00 MOB P PRE SPOT PITS AND PIPE SHED. 21:00 - 00:00 3.00 MOB - P PRE RAISE 8 SCOPE DERRICK. RU LINES TO TREE AND TO TIGER TANK. 6/25/2010 00:00 - 01:00 1.00 MOB P PRE FILL PIT WITH 8.7 PPG BRINE. CONTINUE TO RU LINES TO TREE. ACCEPT RIG AT 01:00 HOURS. Printed 7/19/2010 11:48:20AM • North America -ALASKA - BP Page 1 of 6 Operation Summary Report Common Well Name: MPI-12 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 6/25/2010 End Date: 7/1/2010 X4-OOQ9D-E (375,000.00 ) Project: Milne Point Site: M Pt I Pad Rig Name/No.: NABORS 4ES Spud Date/Time: 10/7/2001 12:0O:OOAM Rig Release: 6/30/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: MPI-12: @63.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (nr> (n) 6/25/2010 01:00 - 02:30 1.50 KILLW P DECOMP FILL PITS WITH 110 DEGREE 8.7 PPG BRINE. CONTINUE TO RU LINES TO TREE. 02:30 - 03:30 1.00 KILLW P DECOMP RU LUBRICATOR AND TEST TO 500 PSI. PULL BPV. 200 PSI TRAPPED. 03:30 - 04:00 0.50 KILLW P DECOMP PJSM WELL KILL. 04:00 - 09:00 5.00 KILLW P DECOMP :INITIAL TUBING PRESSURE 90 PSI, ANNULAR PRESSURE 970 PSI. -CIRCULATE 1000 STROKES (-59 BBLS) DOWN THE TUBING. 1 - 3 BPM @ 220 - 460 PSI. - SHUT IN AND BULLHEAD LINERS WITH AN ADDITIONAL 2000 STROKES (-118 BBLS);. - OPEN THE CHOKE AND. CONTINUE TO CIRCULATE 2 = 4 BPM @ 470 -1500 PSI. UNTIL RETURNS CLEAN UP, - 330 BBLS -PUMPED A TOTAL OF 507 BBLS. -SHUT IN AND MONITOR WELL. TBG = 50 PSI, IA = 50.PSI. 09:00 - 13:00 4.00 KILLW P DECOMP CIRCULATE THROUGH THE GAS BUSTER. -2BPM@280 PSI. =PUMPED 380 STROKES (-22 BBLS). - NO LOSS. SHUT IN AND MONITOR WELL -TBG = 50 PSI, IA = 50 PSI. BLEED OFF TBG FOR 5 MINUTES AND THEN SHUT IN AND OBSERVE FOR 15 MINUTES. -THIS PROCESS WAS REPEATED FOR 1.5 HRS. - A TOTAL OF 7 BBLS WAS BLED OFF IN 1 TO 0.25 BBL INCREMENTS UNTIL THE WELL WAS STATIC. 13:00 - 14:30 1.50 KILLW P DECOMP MONITORED WELL WHILE RWO SUPERINTENDANT AND RWO ENGINEER WERE APPRAISED OF THE SITUATION. AFTER SOME DISCUSSION THE DECISION WAS MADE TO WEIGHT UP TO 9.1 PPG TO MAKE SURE THAT WE WERE OPERATING WITH AT LEAST A 75 PSI OVERBALANCE. 14:30 - 19:30 5.00 KILLW X FLUD DECOMP WAIT ON TRUCK WITH 290 BBLS OF 9.9 PPG SPIKE FLUID TO INCREASE WEIGHT OF BRINE IN PITS TO 9.1 PPG. D-5 DRILL (KILL DRILL) -WHILE WAITING FOR TRUCKS RIG CREWS SPOTTED AND RU THE SPOOLING UNIT, PU TUBING RUNNING EQUIPMENT AND SERVICED RIG. 19:30 - 21:00 1.50 KILLW X FLUD DECOMP BLEND 9.9 WITH 8.7 TO YIELD 9.1 PPG BRINE. Printed 7/19/2010 11:48:52AM • North America -ALASKA - BP Faye 2 of 6 Operation Summary Report Common Well Name: MPI-12 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 6/25/2010 End Date: 7/1/2010 X4-OOQ9D-E (375,000.00 ) Project: Milne Point Site: M Pt I Pad Rig Name/No.: NABORS 4ES Spud Date/Time: 10/7/2001 12:OO:OOAM Rig Release: 6/30/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: MPI-12: @63.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 21:00 - 00:00 3.00 KILLW X FIUD DECOMP CIRCULATE 56 BBL OF 9.1 BBP BRINE THRU TUBING @ 4 BPM 1130 PSI. SHUT IN AND BULLHEAD 60 BBL TO FORMATION @ 2 BPM 670 PSI. CIRCULATE 9.1 PPG BACK TO SURFACE 4 BPM AT 1050 PSI. LOST 15 BBL TO FORMATION. 6/26/2010 00:00 - 01:30 1.50 KILLW P DECOMP INITIAL SHUT IN PRESSURE 60 PSI TUBING AND 30 PSI ANNULUS. BLEED OF TO FORMATION IN 35 MINUTES TO 10 PSI TUBING 0 PSI ANNULUS. BLEED OF TUBING PRESSURE. MONITOR WELL. 01:30 - 03:00 1.50 WHSUR P DECOMP SET TWC WITH DRY. ROD. TEST TWC FROM ABOVE TO 3500 PSI CHARTED FOR 10 MINUTES. CONDUCT ROLLING TEST BELOW TWC TO 500 PSI @ 4 BPM. CHART TBST FOR 10 MINUTES. 03:00 - 04:00 1.00 WHSUR P DECOMP ND TREEAND ADAPTER FLANGE. 04:00 - 05:30 1.50 WHSUR P ' DECOMP NU BOP. 05:30 - 06:00 0.50 WHSUR P DECOMP RU TEST EQUIPMENT. SERVICE CHOKE MANIFOLD. 08:00 - 09:00 1.00 WHSUR P DECOMP FUNCTION TEST BOP. D-4 DRILL 09:00 - 09:30 0.50 WHSUR P DECOMP PUTESTTOOLS. 09:30 - 10:00 0.50 WHSUR P DECOMP FILL IA WITH 9 BBL. 10:00 - 11:00 1.00 WHSUR P DECOMP REBUILD SENSORS. PURGE LINES. FLUSH AIR FROM STACK. 11:00 - 15:30 4.50 WHSUR P DECOMP TEST BOP 250/ 3500 PSLTEST BLINDS, CHOKE MANIFOLD, CHOKE 8 KILL LINE VALVES, FLOOR VALVE,2-7/8 X 5 VBR'S, & ANNULAR WITH 2-7/8 TEST JOINT. AOGCC WITNESSING OF TEST WAIVED BY LOU GRIMALD @ 08:40 6-25-2010 TEST WITNESSED BY BP WSL AND NABOR'S TP PERFORM KOOMEY TEST 200 PSI BUILDUP TO 1900 PSI FROM 1700 PSI = 41 SECONDS FULL BUILDUP TO 3000 PSI = 172 SECONDS 4 BOTTLES X 2100 PSI 15:30 - 16:00 0.50 WHSUR P DECOMP LD TEST TOOLS 16:00 - 18:00 2.00 PULL P DECOMP RU LUBRICATOR AND TEST TO 500 PSI. PULL TWC 18:00 - 18:30 0.50 REST P DECOMP LD DUTCH SYSTEM. PU LANDING JOINT AND BOLDS. 18:30 - 19:00 0.50 PULL P DECOMP PULL HANGER TO FLOOR. PU WT 40K SO WT 20K. LD HANGER. 19:00 - 20:30 1.50 PULL P DECOMP FILL WELL WITH 5 BBL. CIRCULATE WELL 5BPM @ 1320PSI. TOTAL 5600 STROKES PUMPED. LOST 35 BBL TO FORMATION. 20:30 - 21:00 0.50 PULL P OECOMP FLOW CHECK WELL. NO FLOW. 21:00 - 22:30 1.50 PULL P DECOMP CUT AND SLIP 90' OF DRILL LINE. 22:30 - 00:00 1.50 PULL P DECOMP PULL 2-7/8 COMPLETION. 6/27/2010 00:00 - 06:00 6.00 PULL P DECOMP CONTINUE TO POOH W/ 2 7/8" COMPLETION STRING. CONTINUOUS HOLE FILL. LD JOINT 148. Printed 7/19/2010 11:48:52AM r~ .i North America -ALASKA - BP Page s of s Operation Summary Report Common Well Name: MPI-12 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 6/25/2010 End Date: 7/1/2010 X4-OOQ9D-E (375,000.00 ) Project: Milne Point Site: M Pt I Pad Rig Name/No.: NABORS 4ES Spud DatelTime: 10/7/2001 12:0O:OOAM Rig Release: 6/30/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: MPI-12: @63.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 07:00 1.00 PULL P DECOMP CREW CHANGE -SERVICE BLOCKS AND DRAWWORKS - ENVIRONMENTAL WALKAROUNDS -CHECK AND SET PVT ALARMS - DERRICK INSPECTION DISCUSSED POTENTIAL DROPPED OBJECTS DURING PRETOUR MEETING. THERE IS A LOOSE 1"'DUMMY GLV IN THE STRING THAT WAS KNOCKED OUT PRE-RIG. 07:00 - 08:00 1.00 PULL P DECOMP CONTINUE TO POOH W/ 2-7/8" ESP COMPLETION. -tD 2-7/8" L-80, EUE 8RD TUBING. ON JOINT #180 AT 08:00.. -CURRENT LOSSRATE "- 9 BPH + DISPLACEMENT. - CONTINUOUS HOLE FILL. 08:00 - 14:00 6.00 PULL P DECOMF CONTINUE TO POOH W/ 2-7/8" ESP COMPLETION. - LD 2-7/8" L-80, EUE 8RD TUBING. - LOSS RATE - 9 BPH + DISPLACEMENT. -CONTINUOUS HOLE FILL. -D1 TRIP DRILL -DS KILL DRILL -RECOVERED DUMMY GLM FROM TOP OF PUMP. 14:00 - 16:00 2.00 PULL P DECOMP PULL AND LD PUMP ASSEMBLY. 16:00 - 19:00 3.00 PULL P DECOMP CLEAN RIG FLOOR. LOAD PIPE SHED. 19:00 - 00:00 5.00 PULL P DECOMP CONTINUE TO LOAD ,DRIFT AND TALLY 2-7/8 EUE 8RD TUBING. 6!28/2010 00:00 - 02:00 2.00 RUNCOM P RUNCMP CONTINUE TO LOAD DRIFT AND TALLY 2-7/8 EUE 8RD TUBING. LOSS RATE5 BPH. 02:00 - 02:30 0.50 RUNCOM P RUNCMP WEEKLY SAFETY MEETING. 02:30 - 06:00 3.50 RUNCOM P RUNCMP ASSEMBLE AND SERVICE ESP COMPONENTS. 06:00 - 08:00 2.00 RUNCOM P RUNCMP MAKE UP MLE. 08:00 - 11:00 3.00 RUNCOM P RUNCMP RIH W/ ESP ON 2-7/8", L-80, EUE 8RD PIPE. -PICKING UP TUBING FROM PIPE SHED 1X1. -CANNON CLAMPS ON EVERY JOINT. RWO SUPERINTENDANT AND CHECK 6 ONSITE FOR OBSERVATIONS AND DISCUSSIONS. Printed 7/19/2010 11:48:52AM • • North America -ALASKA - BP Page a or s Operation Summary Report Common Well Name: MPI-12 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 6/25/2010 End Date: 7/1/2010 X4-00O9D-E (375,000.00 ) Project: Milne Point Site: M Pt I Pad Rig Name/No.: NABORS 4ES Spud Date/Time: 10/7/2001 12:OO:OOAM Rig Release: 6/30/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: MPI-12: @63.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 12:00 1.00 RUNCOM P RUNCMP D1 -KICK WHILE TRIPPING DRILL. - TOOLPUSHER PUSHED ON THE FLOWLINE FLOAT PADDLE TO SIMULATE A KICK. - 62 SECONDS AT INITIALIZING THE ALARMS THE WELL WAS SECURED. - RIG CREW RESPONDED APPROPRIATELY. AAR WAS HELD WITH THE TOOLPUSHER, RWO SUPERINTENDANT, CHECK 6, AND THE RIG CREW. -CREW DID A GOOD JOB OF RECOGNIZING AND RESPONDING TO THE "KICK" -RIG CREW ONLY PUT THE FULL OPENING SAFETY VALVE.ON HANG TIGHT. DISCUSSION WAS HELD ON HOW THEY SHOULD DRILL AS THOUGH IT IS THE REAL THING AND SHOULD PRACTICE TORQUING UP THE TIW DURING THE DRILL. 12:00 - 00:00 12.00 RUNCOM - P RUNCMP.. CONTINUE TO RIH W/ ESP ON 2-7/8", L-80, EUE 8RD PIPE. -PICKING UP TUBING FROM PIPE SHED 1X1. - CANNON CLAMPS ON EVERY JOINT. - FILL TUBING AND CHECK ESP CABLE EVERY 2000'. - AT 23:59 HRS PU JOINT 195 START OF HEAT TRACE. D-1 DRILL PU PUP JOINT TO ALLOW MAKE UP OF TIW WITH TONGS. CREW HAD GOOD RESPONCE .SIMULATED CUTTING ESP CABLE, MOVED JOINT INTO POSITION AND SIMULATED CLOSING PIPE RAMS. HELD AFTER ACTION REVIEW AGREED TO HAVE THIRD PARTY GO TO MUSTAR AREA I.E. CENTRILIFT. 6/29/2010 00:00 - 06:00 6.00 RUNCMM P RUNCMP CONTINUE TO RIH W/ ESP ON 2-7/8", L-80, EUE 8RD PIPE. -PICKING UP TUBING FROM PIPE SHED 1X1. - CANNON CLAMPS ON EVERY JOINT. - FILL TUBING AND CHECK ESP CABLE EVERY 2000'. - AT 04:30 HRS PU JOINT 208 START OF HEAT TRACE. 06:00 - 14:00 8.00 RUNCOM P RUNCMP CONTINUE TO RIH W/ ESP ON 2-7/8", L-80, EUE 8RD PIPE. -PICKING UP TUBING FROM PIPE SHED 1X1. -CANNON CLAMPS ON EVERY JOINT. -FILL TUBING AND CHECK ESP CABLE EVERY 2000'. - AT JNT 242 @ 14:00 14:00 - 17:00 3.00 RUNCOM P RUNCMP MAKE REEL TO REEL SPLICE -C/O SPOOLS. -PU CANNON CLAMPS. Printed 7/19/2010 11:48:52AM C~ North America -ALASKA - BP Page s of s Operation Summary Report Common Well Name: MPI-12 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 6/25/2010 End Date: 7/1/2010 X4-0009D-E (375,000.00 ) Project: Milne Point Site: M Pt I Pad Rig Name/No.: NABORS 4ES Spud Date/Time: 10/7/2001 12:0O:OOAM Rig Release: 6/30/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: MPI-12: @63.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:00 - 20:00 3.00 RUNCOM P RUNCMP CONTINUE TO RIH W/ ESP ON 2-7/8", L-80, EUE 8RD PIPE. -PICKING UP TUBING FROM PIPE SHED 1X1. - MAINTAINING CONT HOLE FILL DURING TRIP, AVG LOSS RATE - 3-4 BPH. 20:00 - 22:00 2.00 RUNCOM P RUNCMP INSPECT DAMAGED HEAT TRACE ARMOR = @ THE TOP OF JNT # 245 CENTRILIFT REPAIRED THE ARMOR AND PERFORMED MEG TEST, EVERYTHING TESTED GOOD 22:00 - 00:00 2.00 RUNCOM P RUNCMP CONTINUE TO RIH W/ ESP ON 2-7/8", L-80, EUE 8RD PIPE. - PICKING UP TUBING FROM PIPE SHED 1X1. -THE ESP GABLE SPLICE CAME OUT RIGHT AT THE COLLAR ON JNT 251. -REPLACED ARMOR ON ESP CABLE AND INSTALLED 4.05" PUP BETWEEN JNTS 250-251 TO SPACE OUT THE SPLICE FROM THE COLLAR. 6/30/2010 00:00 - 06:00 6.00 RUNCOM P RUNCMP.' CONTINUE TO RIH W/ ESP ON 2-7/8", L-80, EUE 8RD"PIPE. -PICKING UP TUBING FROM PIPE SHED 1X1. -CANNON CLAMPS ON EVERY JOINT. -FILL TUBING AND CHECK ESP CABLE EVERY 2000'. -CONTINUOUS HOLE FILL DURING TRIP, AVG LOSS RATES - 3-4 BPH 06:00 - 06:30 0.50 RUNCOM P RUNCMP CREW CHANGE. -SERVICE DRAWWORKS, CHECK AND SET PVTS, ENVIRONMENTAL WALK AROUND. 06:30 - 09:30 3.00 RUNCOM P RUNCMP CONTINUE TO RIH W/ ESP ON 2-7/8", L-80, EUE 8RD PIPE. -PICKING UP TUBING FROM PIPE SHED 1X1. -CANNON CLAMPS ON EVERY JOINT. -FILL TUBING AND CHECK ESP CABLE EVERY 2000'. -CONTINUOUS HOLE FILL DURING TRIP, AVG LOSS RATES - 3-4 BPH 09:30 - 10:00 0.50 RUNCOM P RUNCMP PU AND MU TUBING HANGER. 10:00 - 12:30 2.50 RUNCOM P RUNCMP MU TUBING HANGER SPLICE FOR ESP CABLE AND FOR HEAT TRACE CABLE. 12:30 - 13:00 0.50 RUNCOM P RUNCMP CHECK ORIENTATION AND LAND TUBING HANGER IN TUBING SPOOL - PU WEIGHT = 52K LBS - SO WEIGHT = 27K LBS ' - 3 FLAT GUARDS, 6-PROTECTOLIZERS, 193- CANNON CLAMPS, 110 CANNON X-COLLAR CLAMPS, 533 CANNON 5' MID JNT 2 LINE CLAMPS , 12-S.S BANDS Printed 7/19/2010 11:48:52AM 1,'~ North America -ALASKA - BP I=age 6 or s Operation Summary Report Common Well Name: MPI-12 DIMS AFE No Event Type: WORKOVER (WO) Start Date: 6/25/2010 End Date: 7/1/2010 X4-00O9D-E (375.000.00 ) Project: Milne Point Site: M Pt I Pad Rig NamelNo.: NABORS 4ES Spud Date/Time: 10/7/2001 12:OO:OOAM Rig Release: 6/30/2010 Rig Contractor: NABORS ALASKA DRILLING INC. UWI: Active Datum: MPI-12: @63.4ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 14:00 1.00 WHSUR P RUNCMP DRY ROD TWC IN TUBING HANGER. -TESTED TWC FROM ABOVE TO 1000 PSI FOR 10 CHARTED MINUTES -GOOD TEST. -TESTED TWC FROM BELOW TO 500 PSI FOR 10 CHARTED MINUTES, ROLLING TEST. -GOOD TEST. 14:00 - 17:00 3.00 BOPSUR P RUNCMP pJSM TO BLOW DOWN LINES & ND BOPE =ND 13-5/8" GK HYDRILL BOP. -SINGLE BARRIER DISPENSATION IN PLACE FOR MILNE POINT WELL -TESTED TWC INSTALLED FOR NIPPLE DOWN •'" 24 HR NOTIFICATION OF BOP TESTING FOR UPCOMING MPI-13 "" -JOHN CRISP AND TOLD US HE WOULD LIKE A CALL TOMORROW MORNING WITH AN UPDATE. 17:00 - 18:30 1.50 WHSUR P RUNCMP NU 2-9/16" SM ,FMC TREE 18:30 - 20:30 2.00 WHSUR P RUNCMP pT TREE & TUBING HEAD ADAPTER TO 5,000 PSI FOR 5 MINUTES WITH DIESEL -PT HANGER VOID FOR 30 MIN @ 5000 PSI CENTRILIFT PERFORMED FINAL CHECKS ON ESP AND HEAT TRACE -GOOD TESTS. 20:30 - 21:30 1.00 WHSUR P RUNCMP RU LUBRICATOR AND TEST WITH DIESEL TO 500 PSI. -PULL 2.5" CIW "H" STYLE TWC 21:30 - 00:00 2.50 WHSUR P RUNCMP -INSTALL & TEST BPV FROM BELOW TO 500 PSI FOR 10 CHARTED MIN. -PUMPING @ 5 BPM TOTAL OF 90 BBLS LD LUBRICATOR -SECURE WELL AND CELLAR -AAR FOR MPI-12 "" RIG RELEASED AT 00:00 "' Printed 7/19/2010 11:48:52AM Wellhead: 11" 5M Gen 5 w/2-7/8" 8 rd. T&B Tubing Hanger w/ CIW "H" BPV profile 20", 92 #/ft H-40 Welded 112' 10.75", 45.5#/ft BTC L-80 2905' M P I - ~ 2 Orig. KB''~G. = 64.7' (Nabors 22-E) Orig. GL Elev. = 34.7' (Nabors 22-E) 2 7/8" 6.5 ppf, L-80, 8rd, EUE production tubing ( drift ID = 2.347", cap. = 0.00592 bpf ) 7" 26 ppf, L-80, BTGMod production casing 2-7/8" XN nipple 9 573' ( drift ID = 6.151", cap. = 0.0383 bpf) (ID 2.205") , 2-7/8" x 3 1/2" X-Over 9,587` KOP @ 300' t WeIILift Discharge gauge g 589 Max well bore Angle: 85.5° @ 8102' MD Gauge = 3587' ND 63.74° @ 2550' MD PCP Pump Lr2ooo with ' Hole angle through perfs = 90°+/- Flex-shaft Assy csl=_zz338xA 9,595 - Gear Reduction Unit g 587' GRU 5388 11.43:1 Tandem Seal Section ' GS83 DB UTILT H17 VH PFS FEI 9,627 Motor, KMH, 76 HP, 1360 volt, ' 34 amp, rested to ss HP, 9,642 Q ~ 8ot volt, 41 amp, KMH-A WeIILift MGU Gauge w/6 fin 9,650' Centralizer Gauge = 3599' ND Top of "OA" Window - 9916' and Bottom of "OA" Window - 9928' and Angle @ Top of Window - 80° Top of "OB" Window - 10228' and Bottom of "OA" Window - 10240' and Angle @ Top of Window - 87° Baker Tie Back Sleeve 10116` Baker ZXP Liner Top Packer 10128' Baker 7" x 5" HMC Liner Hanger 10147' 7" Halliburton Float Collar 10265` 7" Halliburton Ream Shoe 10347' Baker Hook Wall Hanger above 7" Window Q 9906' Baker Hook Wall Hanger below 7° Window Q 9928' Baker Tension Lock Swivel Q 9930' 6 1/8" Hole TD @ 12500'I Cameo 2-7/8" x 1" 202' sidepocket KBMM GLM Cameo 2-7/8" x 1" 2,508' sidepocket KBMM GLM OA Lateral 1 )<• - 4-1/2" 12.6# L-80 IBT Solid Liner (9936' - 9980') 76 Jts - 41/2" 12.6# L-80 IBT Sbtted Liner (9980' -12393') Btm. 4 1/2" Packoff Bushing 12395' Solid bent jt. - 4-1/2", 12.6# L-80 IBT (uncentralized), (12395' -12435') etm. 41/2" Guide Shoe 12435' 6 1/8" Hole td @ 12470' OB Lateral 5 Jts - 4-1/2" 12.6# L-80 IBT Salid Liner (10164' -10373') ~ 53 Jts - 41/2" 12.6#/ft. L-80 IBT Slotted Liner (10373'-12396') Btm. Baker 4 1/2" Packoff Bushing 12 Btm. Baker 4 1/2" Guide Shce 12439' DATE I REV. BY I COMMENTS 11/15/01 GMH Nabors 22E Drill Multi-lat & Run Tbg. 12/15/01 BMH ESP Completion Nabors 4ES 06/30/10 Hulme Convert to PCP - Nabors 4ES MILNE POINT UNIT WELL I-12 API NO: 50-029-23038 BP EXPLORATION ~AK~ . . MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc 8 J f'()- À ~ (J '-t DATA SUBMITTAL COMPLIANCE REPORT 1/6/2004 Permit to Drill 2011640 Well Name/No. MILNE PT UNIT SB 1-12L 1 Operator BP EXPLORATION (ALASKA) INC 5rzul 7 t) &-~ I API No. 50-029-23038-60-00 MD 12500 - -- TVD 3631 / Completion Date 12/8/2001 ----- Completion Status 1-01L Current Status 1-01L UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey NO- Y~"--- DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: (data taken from Logs Portion of Master Well Data Maint) ~~ - --, Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ~ D ~598 4.-EO C UO'831 I I Log Log Scale Media Run No 1 1 Interval OH / Start Stop CH Received 252 12446 Open 2/20/2002 Comments 108 12500 Open 5/9/2002 I i I I ---~.J Well Cores/Samples Information: Name Interval Start Stop Sent Received Sample Set Number Comments ADDITIONAL INFORMATION Well Cored? Y ~ Daily History Received? &)N (1/N Chips Received? ,Y I tl - Formation Tops Analysis Received? ~ Y llL---- ,...-~- --~-~----- Comments: Com pliance Reviewed By: ~ Date: C, .) - ~~ --- --- ( ( WELL LOG TRANSMl'rl'AL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn. : Lisa Weepie 333 West 7ili Avenue, Suite 100 Anchorage, Alaska 99501 March 7, 2002 RE: MWD Fonnation Evaluation Logs - :MPI-12, :MPI-12 Ll, & PBI AK-rvß1-III64 lVIPI-12: aCI-/~3 Digital Log Images: JO~3D~' 1 CD Rom /ð-Õ/7- 0 I 50-029-23038-00 lo3D J O%-lat..J 70 lVIPI-12 Ll: ö1 OJ-~iot.J,.- Digital Log Images: /1-/0-0 J L Dî)31 1 CD Rom 50-029-23038-60 I 0 ~ -1;;).500 -. LD'3D l\1PI-12 PB1: aO-l~~ Digital Log Images: 1 CD Rom JD-@7-0J ta~~é'cl" 50-029-23038- 70 103 a ~'.~-'..." ,/¡~."i.,...~ ) O~-/3d~3 PLEASE ACKNOWLEDGE RECEIPT BY SIGNlNG AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Sigl1(~=ZVæ L~ ~ RECEIVED Date: r,~ ,\'./ n ;î '}¡liYj i,.": l: ;I ~-'w~{. .~Iaska on & Gas Cons. Commission . Anchorage 'I' \, ~. ',',J:l\.,",",:I",":,."',!,'~,':,-':':)'".,:,',',"','/, iE,', 'II . <::J?):.Q .J~.'\O, } WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 J\nchorage,Aùaska 99501 February 18, 2002 RE: MWD Fonnation Evaluation Logs MPI-12 LI, AK-l\fl\1-11164 1 LIS fonnatted Disc with verification listing. API#: 50-029-23038-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Sign~~ Date: RECEIVED FEB 2 0 2002 Alaska Oil & Gas Cons. Commission Anctøage I' ( (' STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 4c " 23. CASING SIZE 20" 10-3/4" 1. Status of Well 18:1 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface -', ,:"',:-' LocÄl10N$~ 2345' NSL, 3996' WEL, SEC. 33, T13N, R10E, UM :"-.-:-- .-, , 'flOO , At top of productive interval " ,j~_:-'K-'.c?L ¡ I } 3439' NSL, 1280' WEL, SEC. 31, T13N, R10E, UM í~ ~/L-)~-::,) "i" -. .""'.. 10. Well Number At total depth OlL ~ ;~. L" ' ~,~ 3640' NSL, 3867' WEL, SEC. 31, T13N, R10E, UM ~:-~:~~~:,::,-::::-::,:,~""""""';I' 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 63.40' ADL 025517 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 1 0-7-2001 11-9-2001 12-8-2001 17. Total Depth (MD+ TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey 12500 3631 Fr 12500 3631 FT 181 Yes 0 No 22. Type Electric or Other Logs Run MWD, DIR, DIR (IFR), GR, RES, PWD, ABGR, ABI ASING, LINER AND CEMENTING RECORD SETTING EPTH HOLE Top BOTTOM SIZE CEMENTING RECORD 29' 108' 30" 60 sx Arctic Set A rox. 28' 2906' 13-1/2" 85 sx AS Lite 502 sx Class 'G' 27' 9916' 9-7/8" 1172 sx Class 'G' 9907' 12437' 6-1/8" Uncemented Slotted Liner Classification of Service Well . 7. Permit Number 201-164 8. API Number 50- 029-23038-60 9. Unit or Lease Name Milne Point Unit MPI-12L 1 11. Field and Pool Milne Point Unit 1 Schrader Bluff 15. Water depth, if offshore 16. No. of Completions NIA MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) WT. PER FT. 92# 45.5# 26# 12.6# GRADE H-40 L-80 L-80 L-80 AMOUNT PULLED 7" 4-1/2" 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner 25. SIZE 2-7/8",6.5#, L-80 TUBING RECORD DEPTH SET (MD) 9656' PACKER SET (MD) N/A MD TVD MD TVD 9981' - 12394' 3658' - 3638' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED Freeze Protected with 95 Bbls of Dead Crude. 27. Date First Production December 19, 2001 Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Electric Submersible Pump PRODUCTION FOR OIL-BBL TEST PERIOD GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. OIL-BBL GAs-McF WATER-BBL OIL GRAVITy-API (CORR) ,I;F""'~" :C!:"'," ~},!,,(' !¡b,~ rJ \",1,'"""", Ii 1(1 Ii ~Fì\ 1;'1 ¡'I :i"",,'/ _. II"! ,11..il '.,' U (.) It "ìn/'¡';.' /,,: ::J;; [I,; --'f... Form 10-407 Rev. 07-01-80 ",' :1,."',:1'..,, ~_. R 80M S B F l G' 7 200;Submit In Duplicate {" , 29. Geologic Markers Marker Name Measured True Vertical Depth Depth' NA 9100' 3493' NB 9241' 3522' NC 9395' 3552' NE 9470' 3566' NF 9738' 3615' Top of Schradder Bluff OA Sands 9898' 3647' 31. List of Attachments: ( 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. :: ',,"," ,,¡, ill";' n ,') ,"\ I c,.. "l'l ,\1' ,I ( I,' .,. L. H,J (. j¡II.';f"i',"""'~i r, ,11¡(:':"'~\,"1: !l.J:;" Ii" Summary of Daily Drilling Reports, Surveys, Leak-Off Integrity Test 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie HUbble~ . Title Technical Assistant Date Dl.~3. 0 MPI.12L 1 Well Number 201-164 Permit No. / A roval No. INSTRUCTIONS Prepared By Name/Number: Sandra Stewman, 564-4750 GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 1 0-407 Rev. 07-01-80 '. ~'" . I" q ..... ¡"'."I ",' (' " "',\ " C'1,j!'lli I""", , ,\ ~"<\' \ \, '"";1 ~ it '~ "~t ~,.... " i¡ t"... 10/12/2001 10/21/2001 11/3/2001 FIT FIT FIT MPI-12 MPI-12 2,906.0 (ft) 10,355.0 (ft) 10,228.0 (ft) 2,406.0 (ft) 3,720.0 (ft) 3,709.0 (ft) 9.10 (ppg) 9.20 (ppg) 9.20 (ppg) ~\c~Ut¡j~I . 487 (psi) 370 (psi) 346 (psi) heak OffÞressure (BHP) 1,624 (psi) 2,148 (psi) 2,119 (psi) fJage 1 of 1 EMW 13.00 (ppg) 11.11 (ppg) 11.00 (ppg) Printed: 11/19/2001 10:03:55AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 10/6/2001 10/7/2001 Date { \, -- ( BP EXPLORATION Operations Summary Report MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Page 1 of25 Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 06:00 - 12:00 From-To Hours Activity Code NPT Phase . 'Description of Operations 12:00 - 12:30 12:30 - 13:30 13:30 - 14:30 14:30 - 15:30 15:30 - 16:30 16:30 - 17:30 17:30 - 22:30 22:30 - 00:00 00:00 - 02:00 02:00 - 03:00 03:00 - 05:00 05:00 - 06:00 06:00 - 08:00 08:00 - 10:00 10:00 -15:30 15:30 -16:00 16:00 - 17:30 17:30 - 19:30 19:30 - 20:00 20:00 - 20:30 20:30 - 21 :00 21 :00 - 23:30 6.00 MOB P PRE 0.50 MOB P PRE 1.00 MOB 1.00 MOB 1.00 MOB P P P PRE PRE PRE 1.00 MOB 1.00 MOB P P PRE PRE 5.00 MOB C PRE 1.50 MOB P PRE 2.00 RIGU P PRE 1.00 RIGU P PRE 2.00 RIGU P PRE 1.00 RIGU P PRE 2.00 RIGU P PRE 2.00 RIGU P PRE 5.50 BOPSUF P SURF 0.50 BOPSUF P 1.50 BOPSUF P 2.00 BOPSUF P SURF SURF SURF 0.50 BOPSUF P 0.50 BOPSUF P SURF SURF 0.50 BOPSUF P SURF 2.50 DRILL P SURF PREPARE RIG FOR MOVE - BLOW DOWN WATER AND STEAM SYSTEM - DISCONNECT ALL LINES BEiWEEN COMPLEXES - DISCONNECT AND PULL BACK ELECTRICAL CABLES HOLD PRE-JOB SAFETY MEETING WITH PEAK OILFIELD SERVICES RIG MOVERS AND NABORS PERSONAL MOVE MOTOR COMPLEX MOVE ROCK WASHER MOVE MUD PIT AND PUMP COMPLEX - MOVE iWO PIPE SHED UNITS MOVE SUB BASE AND MAST OFF WELL REMOVE MATTING BOARDS AND PICK UP HERCULITE AROUND CELLAR RIG MOVE OPERATION SUSPENDED - CONSTRUCTION CREWS INSTALL FLOW LINES AND WELL HOUSE ON WELL MPI-11 INSTALL FMC QUICK CONNECT, 20" DIVERTER SPOOL WITH 16" KNIFE VALVE, AND 21 1/4" ANNULAR ON NEXT WELL MPI-12 - MOVE CAMP GENERATOR, TRUCK SHOP, AND CAMP TO MAKE ROOM FOR PRODUCTION MANIFOLD INSTALLATION. LEVEL LOCATION AROUND WELL MPI-12 WITH DOZER- SET MATTING BOARDS AND LAY HERCULITE - MOVE SUB BASE AND MAST DOWN PAD TO POSITION OVER WELL. HOLD PRE-JOB SAFETY MEETING - MOVE SUB BASE AND MAST OVER WELL MPI-12 SET MATTING BOARDS - SPREAD HERCULITE - SET MUD PIT PUMP COMPLEX, AND ROCK WASHER SPOT PIPE SHEDS AND MOVE MOTOR SHED COMPLEX INTO POSITION SPOT RIG FUEL STORAGE TANK, PIPE SHED TIOGA HEATER, AND CUTINGS TANK BERM AROUND RIG - HOOK UP UTILITIES BEiWEEN COMPLEXES CIRCULATE STEAM AND WATER AROUND RIG - TAKE ON WATER INTO PITS NIPPLE UP 20" DIVERTER SYSTEM AND 16" DIVERTER LINE - INSTALL RISER, FLOW LINE AND TURNBUCKLES - MIX SPUD MUD RIG UP 5" PIPE HANDLING TOOLS ON RIG FLOOR PICK UP AND STAND BACK IN MAST 14 JOINTS OF 5" HWDP AND DRILLING JARS PICK UP 131/2" BIT AND BHA NO.1 WITH SPERRY SUN DIRECTIONAL DRILLER HOLD PRE-SPUD MEETING WITH ALL PERSONAL FUNCTION TEST DIVERTER SYSTEM - ENSURE PACKING CLOSED COMPLETELY AND KNIFE VALVE FULLY OPENED - PREFORM ACCUMULATOR TEST - CHECK LEL AND H2S GAS DETECTION SYSTEM - WITNESS OF TEST WAIVED BY AOGCC REPRESENTIVE CHUCK SCHEVE. BLOW AIR THRU MUD LINES - CIRCULATE WATER BACK TO MUD PITS - CHECK FOR LEAKS AROUND RIG NABORS RIG 22E ACCEPTED FOR WELL WORK ON MPI-12 AT 12:00 HOURS 10/07/01 (AFE NO. 337247) - SPUD Printed: 11/19/2001 10:04:11 AM " ,-,,' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 'Date 1017/2001 10/8/2001 10/9/2001 10/10/2001 21 :00 - 23:30 23:30 - 00:00 00:00 - 03:00 03:00 - 04:00 04:00 - 08:00 08:00 - 08:30 08:30 - 00:00 00:00 - 09:30 09:30 -11:00 11:00 -13:30 13:30 -15:00 15:00 - 16:00 16:00 - 19:00 19:00 - 21:00 21 :00 - 23:00 23:00 - 23:30 23:30 - 00:00 00:00 - 03:00 03:00 - 07:30 (' BP, EXPLÖRA TION . _c. :O.perations Summary Report " MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E .Hours, AètivityCode NPT; Phase', 2.50 DRILL SURF P 0.50 DRILL 3.00 DRILL SURF SURF P P 1.00 DRILL SURF P 4.00 DRILL SURF P 0.50 DRILL P SURF 15.50 DRILL SURF P 9.50 DRILL SURF P 1.50 DRILL P SURF 2.50 DRILL SURF P 1.50 DRILL SURF P 1.00 DRILL 3.00 DRILL SURF SURF P P 2.00 DRILL P SURF 2.00 DRILL 0.50 DRILL 0.50 CASE 3.00 CASE P P P P SURF SURF SURF SURF 4.50 CASE P SURF , 'Pðge2of25 ,', Start: 10n/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 10/7/2001 End: 11/14/2001 'Description of ()perCitions " " ' WELL @ 21:00 HOURS ON 10/07/01 WITH BIT NO.1 - CLEAN OUT 20" CONDUCTOR PIPE WITH FRESH WATER - SWAP TO SPUD MUD AND DRILL AHEAD FROM 108' TO 300' CIRCULATE HOLE CLEAN - POH F/ BHA CHANGE HOLD PRE-JOB SAFETY MEETING - STAND BACK 2 STANDS HWDP - CHANGE BHA PICK UP MWD, HANG OFF SUB, UBHO SUB, AND (3) FLEX DRILL COLLARS & RIH WITH BHA - SURFACE TEST MWD TOOL - CONTINUE TO RIH WITH JARS, AND (1) STAND OF HWDP - BREAK CIRCULATION AND WASH LAST 60' TO BOTTOM RIG UP SLICK LINE UNIT AND RUN GRYO WITH WELLS GROUP AND SPERRY SUN DIRECTIONAL DRILL AHEAD PER PROGRAM FROM 300' TO 534' RUN GRYO WITH WELLS GROUP AND SPERRY SUN - RIG DOWN SLICK LINE UNIT DIRECTIONAL DRILL FROM 534' TO 1,936' - WEIGHT ON BIT 20K TO 35K - PUMP RATE AT 450 TO 541 GPM - OFF BOTTOM PUMP PRESSURE AT 1400 PSI. & ON BOTTOM PUMP PRESSURE AT 1,550 PSI. - TOP DRIVE AT 80 RPM MUD MOTOR AT 82 RPM - OFF BOTTOM TORQUE AT 2K & ON BOTTOM TORQUE AT 6K - ROTATING STRING WEIGHT AT 125K - WITH PUMPS ON DRAG UP AT 125K AND DRAG DOWN AT 100K. DIRECTIONAL DRILL FROM 1,936' TO 2,916' - WEIGHT ON BIT 1 OK TO 25K - PUMP RATE AT 450 TO 550 GPM - OFF BOTTOM PUMP PRESSURE AT 1400 PSI. & ON BOTTOM PUMP PRESSURE AT 1,600 PSI. - TOP DRIVE AT 70 TO 80 RPM MUD MOTOR AT 82 RPM - OFF BOTTOM TORQUE AT 3K & ON BOTTOM TORQUE AT 7K - ROTATING STRING WEIGHT AT 125K - WITH PUMPS ON DRAG UP AT 125K AND DRAG DOWN AT 120K. CIRCULATE AND CONDITION MUD WHILE PUMPING SWEEPS HOLD PRE-JOB SAFETY MEETING - MONITOR WELL (STATIC) - POH (SLM NO CORRECTION) TO BHA - NO PROBLEMS SERVICE TOP DRIVE, TRAVELING BLOCKS, AND CROWN SHEAVES - LEVEL SUB BASE RIH (NO PROBLEMS & NO FILL) CIRCULATE AND CONDITION MUD FOR CASING WHILE PUMPING SWEEPS MONITOR WELL (STATIC) - POH 5 STANDS - PUMP DRY JOB - BLOW DOWN TOP DRIVE AND MUD LINE - CONTINUE TO POH LAY DOWN BHAAND DOWN LOAD MWD DATA CLEAR RIG FLOOR RIG UP TO RUN 103/4" CASING RIG UP CASING EQUIPMENT, FRANKS FILL UP TOOL, AND STABING BOARD PICK UP SHOE TRACK AND INSTALL CENTRILIZERS PER Printed: 11/1912001 10:04:11 AM ",- t ( \ -,' ' BP EXPLORATION -.~ Page 3 of 25 Operations:Summary Report, Legal Well Name: MPI-12 Common Well Name: MPI-12 Spud Date: 1017/2001 Event Name: DRILL +COMPLETE Start: 1017/2001 End: 11/14/2001 Contractor Name: NABORS Rig Release: 11/14/2001 Rig Name: NABORS 22E Rig Number: " Date ,;':, From - To Hours Activity Code NPT Phase" ::':"; Description of Operations " " 10/10/2001 03:00 - 07:30 4.50 CASE P SURF WELL PLAN - PUMP THRU SHOE TRACK AND VERIFY FLOATS OPERATIONAL - CONTINUE TO PICK UP A TOTAL OF 69 JOINTS OF 103/4" L-80 BTC 45.5 LB CASING PER PROCEDURE AND RIH - WORK THRU TIGHT SPOT AT 2,025' TO 2,045' - CONTINUE TO RIH WITH CASING. 07:30 - 08:00 0.50 CASE P SURF LAND CASING - HOLD PRE JOB SAFETY MEETING - RIG DOWN FRANKS FILL UP TOOL - INSTALL HALIBURTON CROSS OVER AND DOUBLE PLUG CEMENT HEAD - MAKE UP CIRCULATING SURFACE LINES 08:00 - 09:30 1.50 CASE P SURF CIRCULATE AND CONDITION MUD - HOLD PRE JOB MEETING WITH ALL PERSONAL REGUARDING UP COMING CEMENT OPERATION - RECIPROCATE CASING STRING 195K UP WEIGHT AND 145K DOWN WEIGHT. 09:30 - 13:00 3.50 CEMT P SURF TURN OVER TO HALIBURTON ENERGY SERVICES - PUMP 10 BBL FRESH WATER - TEST SURFACE LINES @ 3,000 PSI. - CONTINUE TO PUMP ADDITIONAL 10 BBL WATER- MIX AND PUMP 50 BBL 10.2 PPG ALPHA SPACER@ 5.2 BPM & 370 PSI. WITH RED DYE ADDED - DROP BOTTOM WIPER PLUG - BATCH UP AND MIX TYPE "L" PERMAFROST 1 0.7 PPG LEAD CEMENT w/ YIELD OF 4.15 FT3/SK - PUMP @ 5.5 BPM w/480 PSI. - TOTAL LEAD SLURRY PUMPED 432 BBLS. OR 585 SACKS - STOP RECIPROCATING CASING STRING WHEN 350 BBLS. LEAD SLURRY PUMPED DUE TO LOSS OF 30K STRING WEIGHT - FOLLOW UP LEAD CEMENT wI SURFACE TAIL DESIGN CLASS "G" PREMIUM 15.8 PPG wI YIELD OF 1.15 FT3/SK - TAIL CEMENT JOB WAS PUMPED @ 4.5 BPM & 550 PSI. - TOTAL TAIL SLURRY PUMPED 103 BBLS. OR 502 SACKS - DROP TOP WIPER PLUG - HALIBURTON PUMPED 20 BBL BEHIND TO CLEAR LINES TURNED OVER TO RIG FOR DISPLACEMENT - DISPLACED @ 8 BPM w/ 9.4 SPUD MUD - PUMPED 2,543 STROKES TO BUMP PLUG - TOTAL CEMENT BACK TO SURFACE 250 BBLS. - FINAL CIRCULATION PRESSURE DURING DISPLACEMENT @ 900 PSI. - CONTINUE TO PRESSURE UP TO 1,900 PSI. AFTER BUMPING PLUG AND HOLD FOR 5 MIN. - BLEED PRESSURE TO 0 PSI. CHECK FLOATS (OK) CEMENT IN PLACE @ 12:41 HOURS 13:00 - 14:00 1.00 CEMT P SURF RIG DOWN SURFACE CIRCULATING LINE AND HALIBURTON CEMENTING HEAD - REMOVE ADAPTOR SWEDGE - DRAIN AND FLUSH DIVERTER SYSTEM - BACK OUT AND LAY DOWN LANDING JOINT - CLEAR RIG FLOOR 14:00 - 16:00 2.00 CEMT P SURF HOLD PRE JOB SAFETY MEETING - REMOVE 16" HYDRAULIC KNIFE VALVE AND DIVERTER LINE - NIPPLE DOWN 21 1/4 2M ANNULAR, DIVERTER SPOOL, AND FMC QUICK CONNECT 16:00 - 17:00 1.00 DRILL N DPRB SURF FLUTED HANGER HYDRAULICED OUT OF HOLE 24" SINCE PLUG WAS BUMPED - RIG UP CASING TOOLS AND PICK UP LANDING JOINT 17:00 -18:00 1.00 DRILL N DPRB SURF PICK UP ON CASING STRING TO 150K INCLUDING TOP DRIVE WEIGHT - SET EMERGENCY SLIPS IN TENSION WITH 80K Printed: 11/1912001 10:04:11 AM - ",,',) , , Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: <,~Date " ~~\~ '", , " 10/10/2001 10/1112001 10/12/2001 , ' 18:00 - 21:00 21 :00 - 00:00 00:00 - 06:30 06:30 - 07:30 07:30 - 08:30 08:30 - 13:30 13:30 -14:30 14:30 - 20:00 20:00 - 20:30 20:30 - 23:00 23:00 - 00:00 00:00 - 01 :00 01 :00 - 02:00 02:00 - 03:00 03:00 - 04:30 04:30 - 05:00 ( ( ':, BP EXPLORATION' Operations Summary Report ~age4:of 25 MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E "', ' Start: 10n/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 10n/2001 End: 11/14/2001 " ::' Description of Operations , BACK OUT AND LAY DOWN LANDING JOINT - MAKE ROUGH CUT ON 10 3/4" CASING - MAKE FINAL CUT - INSTALL TRANSITION NIPPLE - PRE HEAT AND WELD - POST HEAT AND WRAP FOR COOL DOWN PEROID CLEAN MUD SYSTEM - PICK UP 50 STANDS OF 5" DRILL PIPE IN MOUSE HOLE FOR NEXT HOLE SECTION AND STAND BACK IN MAST. CONTINUE TO PICK UP 50 STANDS OF 5" DRILL PIPE & BHA IN MOUSEHOLE STAND BACK IN MAST FOR NEXT HOLE SECTION TEST FMC TRANSITION NIPPLE AROUND WELD (FAILED) REWELD NIPPLE AND TEST TO 1750 PSI. (OK) SERVICE TOP DRIVE, TRAVELING BLOCKS, AND CROWN SHEAVES INSTALL FMC CASING HEAD AND TUBING SPOOL - NIPPLE UP BOP AND RELATED EQUIPMENT - TEST METAL TO METAL SEAL (OK) - INSTALL BELL NIPPLE AND FLOW LINE - HOOKUP TURNBUCKLES AND INSTALL SECOND LOWER ANNULUS VALVE. INSTALL BOP TEST PLUG - RIG UP TEST EQUIPMENT TEST BOP EQUIPMENT - TEST ANNULAR AT THE FOLLOWING PRESSURES 250 LOW & 2,500 PSI HIGH - TEST UPPER AND LOWER PIPE RAMS, BLIND RAMS, CHOKE MANIFOLD, MANUAL AND HCR VALVES ON CHOKE AND KILL LINES, FULL OPENING SAFETY VALVE AND DART VALVE, TOP DRIVE UPPER AND LOWER IBOP VALVES AT THE FOLLOWING PRESSURES 250 LOW AND 3,500 PSI HIGH - PREFORM ACCUMULATOR TEST AND CHECK H2S AND LEL GAS MONITORS CIRCULATE THRU CHOKE MANIFOLD TO POOR BOY GAS BUSTER - INSTALL LONG WEAR RING & RIG DOWN TESTING EQUIPMENT - BLOW DOWN CHOKE LINES MAKE UP BHA NO.2 - PICK UP SPERRY MUD MOTOR & MAKE UP PDC BIT, MAKE UP MWD TOOLS AND ADJUSTABLE STABILIZER - RIH WITH BHA - SURFACE TEST MWD TOOLS AND MUD MOTOR BLOW DOWN MUD LINE AND TOP DRIVE - RIH WITH 5" DRILL PIPE FROM MAST RIH WITH 5" DRILL PIPE FROM MAST FROM 1,677' TO 2,736', WASH LAST STAND DOWN TO 2,802' CIRCULATE AND CONDITION MUD FOR CASING TEST (GOOD 9.1 PPG MUD AROUND) BREAK OFF TOP DRIVE AND BLOW DOWN, RIG UP HEAD PIN FOR CASING TEST - TEST 10 3/4" CASING AT 1,500 PSI. FOR 30 MINUTES (GOOD TEST) - RIG DOWN TEST EQUIPMENT BREAK CIRCULATION AND DRILL CEMENT STRINGERS FROM 2,802' AND TAG WIPER PLUGS AT 2,818' & TOP OF FLOAT COLLAR AT 2,820' - DRILL FLOAT COLLAR AND CEMENT TO TOP OF FLOAT SHOE AT 2,904' - DRILL FLOAT SHOE TO 2,906' - WASH 13 1/2" RAT HOLE TO 2,916' - DRILL NEW 9 7/8" HOLE TO 2,936' CIRCULATE BOTTOMS UP AND CONDITION MUD FOR FIT Hours. Aqtivity Code, N PT Phase 3.00 DRILL N 3.00 DRILL P 6.50 DRILL P 1.00 DRILL N 1.00 DRILL P 5.00 DRILL P 1.00 DRILL 5.50 DRILL P P 0.50 DRILL P 2.50 DRILL P 1.00 DRILL P 1.00 DRILL P 1.00 DRILL P 1.00 DRILL P 1.50 DRILL P 0.50 DRILL P DPRB SURF SFAL INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 . " Printed: 11/1912001 10:04:11 AM Date'" From-To Hours Aptivity Code 'NPT Phase De~criptionofOperations - ' - , ' " ",", ,:,' , 10/12/2001 05:00 - 05:30 0.50 DRILL P INT1 PREFORM FORMATION INTEGRITY TEST -INJECTING AT 180 PSI. WITH 9.1 PPG MUD -EMW AT 10.5 - CHECK SURFACE EQUIPMENT AND SWAP MUD PUMPS - VERIFY FINDINGS WITH SECOND FIT TEST. CIRCULATE AND CONDITION MUD AT SLOW RATE WHILE GETTING INPUT FROM DRILLING ENGINEER AND DRILLING SUPERINTENDENT DRILL AHEAD FROM 2,936' TO 2,966' CIRCULATE BOTTOMS UP - PUMP DRY JOB - BLOW DOWN TOP DRIVE - MONITOR WELL (STATIC) POH WITH 5" DRILL PIPE - DOWN LOAD MWD DATA - STAND BACK BHAAND CLEAR RIG FLOOR RIH WITH MULE SHOE ON 5" DRILL PIPE TO 2,966' CHANGE OUT BALES TO LONGER SET - INSTALL HEAD PIN & CIRCULATE HOLE CLEAN HOLD PRE JOB SAFETY MEETING WITH ALL PERSONAL INVOLVED IN SQUEEZE CEMENT OPERATION. TURN OVER TO HALIBURTON ENERGY SERVICES - PUMP 5 BBLS. WATER - TEST SURFACE EQUIPMENT AT 2,000 PSI. - PUMP 11 BBLS WATER FOLLOWED UP WITH 79 BBLS. PREMIUM 15.8 PPG CEMENT SLURRY - DISPLACE DRILL PIPE WITH 6 BBLS. WATER AND 30 BBLS. 9.1 PPG MUD TO BALANCE CEMENT PLUG. POH SLOW THRU CEMENT TO 1,913' REVERSE CIRCULATE TWO DRILL PIPE VOLUMES -10 BBLS +/- CEMENT CONTAIMANTED MUD BACK TO SURFACE SHUT WELL IN FOR SQUEEZE OPERATION - ESTABLISH INJECTION RATE 4 BPM AT 200 PSt. - STAGE 30 BBLS INTO FORMATION PRESSURE INCREASE TO 400 PSI. - STAGED 10 MORE BBLS. PRESSURE AT 400 PSI.- STAGED 5 MORE BBLS. PRESSURE AT 360 PSI. - STAGED 1 BBL. FINAL PRESSURE AT 350 PSI. WITH 46 TOTAL BBLS. CEMENT INTO FORMATION AND 31 BBLS. CEMENT CALCULATED IN CASING. HOLD PRESSURE ON CEMENT PLUG - FOLLOWING PRESSURE RECORDED: 19:00 HOURS 250 PSI. 20:00 HOURS 240 PSI. 21 :00 HOURS 230 PSI. 22:00 HOURS 220 PSI. '-, , Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05:30 - 06:30 06:30 - 07:00 07:00 - 08:00 08:00 -11:00 11 :00 - 12:00 12:00 - 14:00 14:00 -14:30 14:30 - 15:00 15:00 - 16:00 16:00 - 16:30 16:30 - 18:00 18:00 - 22:00 22:00 - 22:30 22:30 - 23:30 10/13/2001 23:30 - 00:00 00:00 - 02:00 02:00 - 03:00 03:00 - 06:00 , ' ' " "BPlSXPL0RATION. " , Operations Summary Report ( --' -, MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E 1.00 DRILL 0.50 DRILL P 1.00 REMCM N 3.00 REMCM N 1.00 REMCM N 2.00 REMCM~ N 0.50 REMCM N 0.50 REMCM N 1.00 REMCM N 0.50 REMCM N 1.50 REMCM N 4.00 REMCM N 0.50 REMCM N 1.00 REMCM N 0.50 REMCM N 2.00 DRILL N 1.00 DRILL 3.00 DRILL N DPRB INT1 INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INn DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INT1 DPRB INn DPRB INT1 DPRB INT1 N DPRB INT1 N DPRB INT1 ( Page 5 of25 Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 BLEED OFF PRESSURE - MONITOR WELL (STATIC) CIRCULATE BOTTOMS UP - PUMP DRY JOB POH WITH 5" DRILL PIPE FROM 1,913' & STAND BACK IN MAST MAKE UP BHA MAKE UP HAND OFF SUB - INITIALIZE MWD TOOL - MAKE UP FLEX DRILL COLLARS, JARS, AND HWDP - SURFACE TEST MWD TOOL AND SPERRY MUD MOTOR RIH WITH 5" DRILL PIPE FROM MAST TO 1,865' - BREAK CIRCULATION - BLOW DOWN MUD LINES AND TOP DRIVE WAIT ON CEMENT - CLEAN RIG FLOOR AND CELLAR Printed: 11/1912001 10:04:11 AM , - , . ,;:'.~BPEXPLORATION",: ' - ' - - , . " " . 'Operatiøns 'Summa'ry~Report - . , ,.-'. " ^ Legal Well Name: MPI-12 Common Well Name: MPI-12 Event Name: DRILL +COMPLETE Contractor Name: NABORS Rig Name: NABORS 22E ,Ðå~e>;,> From- 'To' 'Hoúrs(~9tivityCode N PT (' , Page 6 of 25 Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 10/13/2001 2.50 DRILL N DPRB INT1 ',' Description of Operations' 06:00 - 08:30 08:30 - 09:00 N DPRB INT1 0.50 DRILL 09:00 - 09:30 0.50 DRILL N DPRB INT1 09:30 - 10:00 0.50 DRILL DPRB INT1 N 10:00 - 10:30 0.50 DRILL N 10:30 -11:00 0.50 DRILL N 11:00 - 00:00 13.00 DRILL P DPRB INT1 DPRB INT1 INT1 10/14/2001 00:00 - 01 :00 01 :00 - 05:00 1.00 DRILL 4.00 DRILL P P INT1 INT1 05:00 - 05:30 0.50 DRILL P INT1 05:30 - 06:30 1.00 DRILL P INT1 06:30 - 07:30 1.00 DRILL P INT1 07:30 - 08:00 0.50 DRILL P INT1 08:00 - 09:30 1.50 DRILL P INT1 09:30 - 10:00 0.50 DRILL N DFAL INT1 10:00 -14:00 4.00 DRILL N DFAL INT1 14:00 - 16:00 2.00 DRILL N DFAL INT1 16:00 -16:30 16:30 -19:30 0.50 DRILL 3.00 DRILL DFAL INT1 DFAL INT1 N N 19:30 - 23:00 N DFAL INT1 3.50 DRILL RIH FROM 1,865' TAG CEMENT STRINGERS @ 2,230' - WASH AND REAM FROM 2,230' TO 2,700' (FIRM CEMENT) - DRILL CEMENT FROM 2,700' TO 2,936' CIRCULATE CEMENT OUT AND CONDITION MUD FOR FORMATION INTEGRITY TEST PREFORM FORMATION INTEGRITY TEST AT 2,936' MD & 2,406' TVD WITH 9.2 PPG MUD - LEAK OFF AT 400 PSI. GIVING EQUALIVANT MUD WEIGHT OF 12.4 PPG. DRILL CEMENT FROM 2,936' TO 2,966' - DRILL 20' OF NEW 9 7/8" HOLE FROM 2,966' TO 2,986' CIRCULATE BOTTOMS UP PREFORM FORMATION INTEGRITY TEST AT 2,986' WITH 9.2 PPG MUD - LEAK OFF AT 370 PSI. GIVING EQUALIVANT MUD WEIGHT OF 12.1 PPG. DRILL AHEAD FROM 2,986' TO 5,434' - WEIGHT ON BIT 3K TO 10K - PUMP RATE AT 550 GPM - OFF BOTTOM PUMP PRESSURE AT 1800 PSI. & ON BOTTOM PUMP PRESSURE AT 2,100 PSI. - TOP DRIVE AT 70 TO 110 RPM MUD MOTOR AT 176 RPM - OFF BOTTOM TORQUE AT 4K & ON BOTTOM TORQUE AT 7K - ROTATING STRING WEIGHT AT 120K - WITH PUMPS ON DRAG UP AT 145K AND DRAG DOWN AT 105K. CIRCULATE SWEEP AROUND - MONITOR WELL (STATIC) STAND BACK FIRST STAND (KELLY) POH SLOW STARTING TO SWAB ON SECOND STAND - PUMP OUT OF THE HOLE FROM 5,247' TO 4,212' - BACK REAM OUT OF THE HOLE FROM 4,212' TO 3,648' - PUMP OUT OF THE HOLE FROM 3,648' TO 2'897' - MONITOR WELL AT SHOE (STATIC) - BLOW DOWN TOP DRIVE AND MUD LINE. SERVICE TOP DRIVE, TRAVELING BLOCKS, AND CROWN SHEAVES RIH FROM 2,897' TO 5,100' - HOLE TIGHT - BREAK CIRCULATION WASH AND REAM FROM 5,100' TO BOTTOM AT 5,434' CIRCULATE BOTTOMS UP DRILL AHEAD FROM 5,434' TO 5,598' - MWD FAILURE CIRCULATE BOTTOMS UP FOR TRIP PUMP OUT OF THE HOLE FROM 5,598' TO 4,683' (NO PROBLEMS) - PUMP DRY JOB & CONTINUE TO POH TO SPERRY MWD TOOL DOWN LOAD SPERRY MWD TOOL - FOUND CEMENT IN BAFFLE PLATE LOCATED IN HANG OFF SUB - CHANGE PROBE AND INITIALIZE SPERRY MWD TOOL RIH WITH BHA SURFACE TEST MWD TOOL FOUND CEMENT IN TOP OF HWDP - REMOVE DRILL PIPE FROM SERVICE USED DURING SQUEEZE JOB OPERATION - REARRANGE PIPE IN MAST - LOAD PIPE SHED WITH 93 JOINTS OF 5" DRILL PIPE - THAW OUT AND SLM PICK UP AND RABBIT 93 JOINTS OF 5" DRILL PIPE FROM PIPE SHED AND RIH - CIRCULATE DRILL PIPE VOLUME AND TEST MUD TOOL - RIH WITH 5" DRILL PIPE FROM Printed: 11/1912001 10:04:11 NIl ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: t , ( , "BPEXÞLORATION" ,: ., Operations <Summary 'Report, " MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E 10/14/2001 19:30 - 23:00 ,~Date "I From -To, Hours Activity Code ,.NPT Phase' 23:30 - 00:00 10/15/2001 00:00 - 00:30 00:30 - 01 :00 01 :00 - 03:00 03:00 - 03:30 03:30 - 07:30 07:30 - 08:00 08:00 - 16:30 16:30 - 17:30 17:30 - 21:00 21 :00 - 23:30 10/16/2001 23:30 - 00:00 00:00 - 00:30 00:30 - 01 :00 01 :00 - 10:30 10:30-11:00 11:00 - 21:30 3.50 DRILL 0.50 DRILL 0.50 DRILL 0.50 DRILL 2.00 DRILL 0.50 DRILL 4.00 DRILL 0.50 DRILL 8.50 DRILL 1.00 DRILL 3.50 DRILL 2.50 DRILL 0.50 DRILL 0.50 DRILL 0.50 DRILL 9.50 DRILL 0.50 DRILL 10.50 DRILL N DFAL INT1 P P N P N INT1 FLUD INT1 INT1 SFAL INT1 P N P INT1 RREP INn INT1 P P P P P N P INT1 INT1 SFAL INT1 INT1 P P INT1 INT1 INT1 INT1 INT1 INT1 .. ' Page 7 of 25 " " . ,0 " Start: 10n/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 10n/2001 End: 11/14/2001 " " <Description of Operations , '. ' ,:". , ',',' ", ' , - " , MAST TO 5,530' - BREAK CIRCULATION AND WASH TO BOTTOM AT 5,598' (NO PROBLEMS OR FILL ON TRIP IN HOLE) DRILL AHEAD FROM 5,598' TO 5,810' - WEIGHT ON BIT 3K TO 10K PUMP RATE AT 550 GPM - OFF BOTTOM PUMP PRESSURE AT 1800 PSI. & ON BOTTOM PUMP PRESSURE AT 2,100 PSI. - TOP DRIVE AT 70 TO 110 RPM MUD MOTOR AT 176 RPM - OFF BOTTOM TORQUE AT 4K & ON BOTTOM TORQUE AT 7K - ROTATING STRING WEIGHT AT 120K - WITH PUMPS ON DRAG UP AT 145K AND DRAG DOWN AT 105K. WASH AND REAM HOLE SECTION FROM 5,717' TO 5,810' CHANGE SHAKER SCREENS - BLINDING OFF DRILL AHEAD FROM 5,810' TO 6,093' FOUND 5/8" NUT ON CROSS MEMBER BEAM IN MAST JUST ABOVE DERRICKMANS MONKEY BOARD ON DRAW WORKS SIDE OF MAST DRILLERS SIDE - PREFORM MAST INSPECTION DIRECTIONAL DRILL AHEAD FROM 6,093' TO 6,656' REMOVE AND TIGHTEN BOLT ON VARCO TOP DRIVE DRILL AHEAD FROM 6,656' TO 7,951' - WEIGHT ON BIT 5K TO 20K PUMP RATE AT 550 GPM - OFF BOTTOM PUMP PRESSURE AT 2000 PSI. & ON BOTTOM PUMP PRESSURE AT 2,300 PSI. - TOP DRIVE AT 100 RPM MUD MOTOR AT 176 RPM - OFF BOTTOM TORQUE AT 1 OK & ON BOTTOM TORQUE AT 12K - ROTATING STRING WEIGHT AT 130K- WITH PUMPS ON DRAG UP AT 190K AND DRAG DOWN AT 90K. CIRCULATE SWEEPS AROUND AND CIRCULATE HOLE CLEAN MONITOR WELL BORE (STATIC) FOR SHORT TRIP - POH FROM 7,971' TO 7,503' START PULLING 10K TO 15K ABOVE NORMAL UPWARD DRAG AND SWABING - PUMP OUT OF THE HOLE WHILE BACK REAMING TO 5,530' - MONITOR WELL AND ADJUST TOP DRIVE MOTOR ALIGNMENT CYLINDER. RIH FROM 5,530' TO 7,700' (NO PROBLEMS) - WORK THRU TIGHT AREA AT 7,700 TO 7,794' - CONTINUE TO WASH TO BOTTOM AT 7,971' DRILL AHEAD FROM 7,971' TO 8,157' DRILLED FROM 8065-8158 FT. GENERATOR #2 OFF LINE. DRILLED FROM 8158-9378 FT. 80-120 RPM, 5-20K WOB, 533 GPM. 2200 PSI ON BTM, 2400 PSI OFF BTM PUW 215K, SOW 80K, ROTW 135K, TQ ON BTM 16K, TQ OFF BTM 13K. ADDING DRILL N SLIDE LUBRICANT TO MUD SYSTEM TO 3.5% CONCENTRATION. CIRCULATE BOTTOMS UP & WAIT ON ORDERS FROM GEOLOGIST. DRILLED 9378-10355 FT MD. LANDED INTERMEDIATE HOLE IN TOP OF OB SAND PER GEOLOGIST ON-SITE. PUW 225K, SOW 90K, ROTW 135K, WOB 10K, RPM 100, 2350 PSI ON BTM, 2300 PSI OFF BTM. 15K TORQUE ON Printed: 11/1912001 10:04:11 AM ( '" ,,; . BP EXPLORATION ,Operations Summary 'Report , Page 8 of25 ..:, , .'. Legal Well Name: MPI-12 Common Well Name: MPI-12 Spud Date: 10n/2001 Event Name: DRILL +COMPLETE Start: 10n/2001 End: 11/14/2001 Contractor Name: NABORS Rig Release: 11/14/2001 Rig Name: NABORS 22E Rig Number: ,.-Date From -:TOè Hours' Activity Code.NPT Description of-Operations 10/16/2001 11:00 - 21:30 10.50 DRILL P INT1 BTM. 12K TORQUE OFF BTM. 10.9 ECD WITH 9.5 PPG MUD. 21 :30 - 00:00 2.50 DRILL P INT1 PUMP 25 BBL VISCOUS SWEEP & CIRCULATE HOLE CLEAN PRIOR TO SHORT TRIP TO 10 3/4" CASING POINT. 10/1712001 00:00 - 00:30 0.50 DRILL P INT1 CONTINUE TO CIRCULATE HOLE CLEAN. MONITOR WELL FOR 10 MINS. HOLE STABILE. 00:30 - 01 :30 1.00 DRILL P INT1 POOH 10355 TO 10038 & WELL STARTED SWABBING. PUMP OUT 10038-9473. HOLE PACKING OFF. 01 :30 - 06:00 4.50 DRILL P INT1 BACK-REAM & PUMP 9473-7408. PUMP OUT 7408-7126'. 06:00 - 08:30 2.50 DRILL P INT1 PUMP DRY JOB. BLOW-DOWN TOP DRIVE & MUD LINE. POOH 7126-2897 FT. TIGHT AT 6785'. 08:30 - 10:00 1.50 DRILL P INT1 CUT & SLIP 108' DRILLING LINE. 10:00 - 11 :00 1.00 DRILL P INT1 RIG SERVICE TOP DRIVE & CROWN. 11:00 -15:00 4.00 DRILL P INT1 RIH 2897' TO 10355'. FILLING DRILL PIPE EVERY 15 STANDS. 15:00 - 19:00 4.00 DRILL P INT1 CIRCULATE & CONDITION MUD. PUMP VISCOUS SWEEP. SPOT 7 PPB STICKLESS GLASS BEADS IN OPEN HOLE. 19:00 - 00:00 5.00 DRILL P INT1 POOH 5 STANDS. HOLE IN GOOD CONDITION WITH NO EXCESSIVE DRAG. PUMP SLUG. POOH 5 ADDITIONAL STANDS. PUW 230K, SOW 100K, ROTW 140K, TORQUE 15K AT 20 RPM WITH PUMPS OFF. POOH RECORDING WEIGHTS AND TORQUE EVERY 500 FT. 10/18/2001 00:00 - 05:30 5.50 DRILL P INT1 POOH LDDP FROM 3648 TO 2830 FT. WET PIPE. ATTEMPT TO PUMP DRY JOB & FOUND DRILL STRING PLUGGED OFF. CONTINUE POOH 2830-267'. 05:30 - 09:00 3.50 DRILL P INT1 LD BHA & FOUND IT PACKED OFF WITH GLASS BEADS. DOWNLOAD MWD. 09:00 - 11 :30 2.50 DRILL P INT1 CLEAR FLOOR FOR BHA. ATTEMPT TO PULL WEAR RING. PULLED 30-50K OVER & WEAR RING CAME FREE. METAL SHAVINGS FOUND ON OUTSIDE. REMOVE RUNNING TOOL 11:30 -12:30 1.00 DRILL P INT1 MEETING WITH BP DRILLING SUPT. BOTH CREWS. 12:30 - 13:30 1.00 CASE P INT1 CHANGE TOP RAMS FROM 3 112" X 6" TO 7". 13:30 - 14:30 1.00 CASE P INT1 TEST RAM DOOR SEALS TO 1000 PSI. RD TEST TOOLS. 14:30 - 15:30 1.00 CASE P INT1 RU CSG RUNNING TOOLS ON FLOOR. 15:30 - 16:00 0.50 CASE P INT1 PLANNING & SAFETY MEETING ON RUNNING 7 INCH HYDRIL 521 CASING, RIGGING UP DRIVE BUSHINGS, & RUNNING IN HOLE. 16:00 - 19:00 3.00 CASE P INT1 RIH W/7 INCH HYDRIL 521 CASING TO 2880 FT. RECORD PUW 130K, SOW 11 OK, ROTW 120K, & TORQUE 4K. 19:00 -19:30 0.50 CASE P INT1 CIRCULATE BOTTOMS UP. 19:30 - 00:00 4.50 CASE P INT1 RIH TO 6315 FT(150 JTS IN) & PIPE STARTED "FLOATING" & STACKING OUT WEIGHT. BEGIN ROTATING & CIRCULATING EVRY JOINT 54 SPM, 240 GPM, 350 PSI. 15-20 RPM, 15K TORQUE, 130 ROTW, 70 SOW, 170 PUW. ROTATE & CIRCULATE TO 6555'. 10/19/2001 00:00 - 01 :00 1.00 CASE P INT1 CONTINUE RIH WASHING AND ROTATING EACH JT DOWN 6805 FT(170 JTS) 55 SPM, 240 GPM, 350 PSI. 15-20 RPM, 15K TORQUE, 130 ROTW, 70 SOW, 170 PUW. 01 :00 - 02:00 1.00 CASE P INT1 CIRCULATE BOTTOMS UP AT 6805'. 02:00 - 13:00 11.00 CASE P INT1 ATTEMPT TO RUN WITHOUT PUMPING OR ROTATING BUT WE COULD ONLY RUN 2JTS BEFORE CASING STARTED FLOATING. WASH AND REAM EACH JTTO Printed: 11/1912001 10:04:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: .. BP EXPLORATION Operations Summary Report ( , MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E f Page,90f25 ..,' . . ".: " Start: 10/7/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 10/19/2001 02:00 - 13:00 "Date~:From - To, . Hours Activity Code NPT ¡.Phase!;: " . ", " " ", Description, of.Operations' ,\ '. " " ,;," 13:00 -14:00 14:00 - 16:30 16:30 -19:00 19:00 -19:30 19:30 - 00:00 1 0/20/2001 00:00 - 04:00 04:00 - 11 :00 11 :00 - 12:30 12:30 - 18:30 18:30 - 22:00 22:00 - 23:30 10/21/2001 23:30 - 00:00 00:00 - 02:30 02:30 - 13:00 13:00 - 14:00 14:00 -15:30 11.00 CASE 1.00 CASE 2.50 CASE 2.50 CASE 0.50 CASE 4.50 CASE 4.00 CASE 7.00 CASE 1.50 CASE 6.00 CASE 3.50 CASE 1.50 CASE 0.50 CASE 2.50 DRILL 1 0.50 DRILL 1.00 DRILL 1.50 DRILL p p p P p P P P P P p P P P P P P INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 PROD1 PROD1 PROD1 PROD1 BOTTOM WITH 55 SPM ,240GPM, AND 350 PSI. 15-18,000 FT LBS TORQUE. MAKE UP LANDING JT AND ATTEMPT TO RUN IN HOLE WITH PUMPS. WEIGHT STACKED OUT. PULLED PIPE OUT OF HOLE IN ATTEMPT TO WORK IT AND STARTED LOOSING HOLE. UD LANDING AND MAKE UP LAST JT OF CASING. CIRCULATE DOWN LAST JT.INCREASE PUMP RATE TO 10 BPM WITH NO LOSSES WITH 650 PSI. TORQUE 20-25,000 FT LBS. ATTEMPT TO WORK PIPE DOWN WITHOUT ROTATING AND COULD NOT. CIRCULATE TWO MORE BOTTOMS UP. PJSM. TEST LINES 3500 PSI. PUMP 20 BBLS WATER. MIX AND PUMP 70 BBLS 10.5 ALPHA SPACER, 240 BBLS 15.8 PPG"G" CEMENT. FOLLOW CEMENT WITH 10 BBLS WATER AND DISPLACE WITH RIG PUMPS. BUMP PLUG 2900 PSI. CIP @ 18:45. FLOAT HELD. FULL RETURNS ENTIRE JOB. BLOW-DOWN TOP DRIVE, MUD LINE, & CMT LINE. RIG DOWN CEMENT HEAD. REMOVE FLOW LINE. RU BRIDGE CRANE. SPLIT BOP STACK AT TUBING SPOOL. PU BOP STACK. PULL 100K TENSION. SET SLIPS. ROUGH CUT 7" & LD LANDING JT. FINAL CUT & DRESS 7" STUB. PU RUNNING TOOL ON 1 STAND HWDP & INSTALL PACK-OFF. NU BOP STACK. TEST PACK-OFF TO 4000 PSI OK. CHANGE 7" RAMS TO 3 1/2 X 6" RAMS. NU FLOWLINE, CENTER BOPS. LA YDOWN CASING & CEMENTING TOOLS. CHANGE-OUT TOP DRIVE & IRON ROUGHNECK TO 31/2" SLIPS & ELEVATORS. TEST BOP'S, ANNULAR, & CHOKE MANIFOLD TO 250 PSI LOW & 3500 PSI HIGH. AOGCC WAIVED WITNESSING TEST(LOU GRIMALDI). PUMP THROUGH CHOKE & GAS BUSTER OK. BLOW DOWN MUD LINE, RU TO LD 5 INCH DRILLPIPE. LA YDOWN LONG BAILS & INSTALL SHORT BAILS & 5 IN ELEVATORS. LA YDOWN 2 HWDP & 133 JTS 51N DP FROM DERRICK. LAY DOWN 5 INCH TOOLS. INSTALL WEAR RING. SINGLE IN HOLE WITH 99 JTS 31/2" DRILLPIPE. STAND BACK 33 STANDS 3 1/2 DRILLPIPE. CLEAR FLOOR. PJSM. START PU 61/8" BHA. CONTINUE MAKING UP 6 1/8" BHA. MU MWD, HOC. ORIENT & UPLOAD MWD. PU 3 FLEX NMDC, SMITH HYDRAULIC JARS ON 2 JTS 3 1/2" DP. PICK UP 3 1/2" DP FROM PIPE SHED & RUN IN HOLE TO 8240'. HOLE DRAG CAUSING DRILLSTRING TO STACK OUT WEIGHT. SPOT EP MUD LUBE & CIRCULATE. BLOW DOWN TOP DRIVE & MUDLINE. RIH PICKING UP 31/2" DP TO 9147'. Printed: 11/1912001 10:04:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date, 10/21/2001 10/22/2001 10/23/2001 l f , , , .. ..', BPEXPLORATION . Operations Summary,'.Report' MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Start: Rig Release: Rig Number: ",' ' Phase,,' 15:30 -16:30 From -To Hours' ActivityCodeNPT PROD1 16:30 - 17:00 17:00 - 18:00 18:00 -19:00 19:00 - 20:30 20:30 - 22:30 22:30 - 00:00 00:00 - 04:00 04:00 - 07:00 07:00 - 09:00 09:00 - 12:30 12:30 - 13:00 13:00 - 13:30 13:30 -14:30 14:30 -15:00 15:00 - 00:00 00:00 - 23:30 23:30 - 00:00 1.00 DRILL 0.50 DRILL 1.00 DRILL 1.00 DRILL 1.50 DRILL 2.00 DRILL 1.50 DRILL 4.00 DRILL 3.00 DRILL 2.00 DRILL 3.50 DRILL 0.50 DRILL 0.50 DRILL 1.00 DRILL 0.50 DRILL 9.00 DRILL 23.50 DRILL 0.50 DRILL P P P P PROD1 PROD1 PROD1 P PROD1 P PROD1 N DFAL PROD1 N N DFAL PROD1 DFAL PROD1 N DFAL PROD1 N P P P P P P DFAL PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 P PROD1 Page tOot 25 .. , 10n/2001 11/14/2001 Spud Date: 10n/2001 End: 11/14/2001 " ," -, Description of Operations: CIRCULATE & SPOT EP MUD LUBE TO REDUCE HOLE DRAG & INCREASE RIH SPEED. BLOW DOWN TOP DRIVE & MUDLINE. RIH & TAG FLOAT COLLAR AT 10265'. CIRCULATE BOTTOMS UP. PRESSURE TEST CASING TO 3500 PSI FRO 30 MINS. BLOW-DOWN KILL LINES DRILL OUT FLOAT COLLAR, SHOE TRACK, AND REAMING SHOE TO 10355'. MWD SIGNAL FADING. MUD WAS AIRED UP AND CEMENT CONTAMINATED(TREATED WI BICARB) AND ASSUMPTION WAS MADE THAT THIS WAS CAUSING THE MWD PULSE RECEPTION PROBLEMS. DECIDED TO GO AHEAD WITH MUD SWAP AS ALL TRUCKS WERE ON LOCATION AND STANDING BY. PRE-TREATED CASING WITH EP MUD LUBE PRIOR TO DISPLACING MUD. DISPLACED 9.5 PPG LSND "OLD" MUD WITH 9.2 PPG "NEW" BARADRILLN. STAND PIPE PRESSURE SPIKED 1000 PSI AT 2130 HRS WHILE CIRCULATING AT 230 GPM STEADY. MWD SIGNAL COMPLETELY LOST. MIX & PUMP 25 BBL, 11 PPG WEIGHTED DRY JOB. START TO TRIP OUT OF HOLE TO INVESTIGATE MWD COMMUNICATION PROBLEMS. POOH FROM 10297 TO 10267 FT. FOUND SPACERS DAMAGED BElWEEN DIRECTIONAL MODULE AND HCIM MODULE. PULSER WAS IMPROPERLY INSTALLED RESULTING IN ELECTRICAL FAILURE BElWEEN TOOLS. PRESSURE SPIKES OBSERVED PRIOR TO TOOL FAILURE WERE PROBABLY DUE TO TEFLON SPACER DEBRIS IN FLOW DIVERTER. CHANGE OUT DM, HCIM TOOL PU MWD TOOL FROM PIPE SHED. MU MWD(GR-RES-PWD) AND UPLOAD MWD. FOUND PULSER IN HOC WAS OUT OF ADJUSMENT. BROKE OUT AND RESET TOOL MU HOC, UPLOAD MWD. MU FLEX NMDC'S, AND JARS ON 1 STAND DP. SURFACE TEST MWD WI PUMPS ON OK. TIH TO 10355 FT. FILLING PIPE EVERY 25 STANDS. RIG SERVICE TOP DRIVE. DRILL 10355 TO 10385 FT. CIRCULATE BOTTOMS UP. CONDUCT F.I.T. TO 11.1 EMW. DRILL FROM 10385 TO 11011 FT. DRILL AHEAD IN OB LATERAL FROM 11011 TO 13243 FT. PUW 120K, SOW 90K, ROlW 120K, TO ON BTM 4K, TO OFF BTM 3K, 56 SPM, 238 GPM, 2950 PSI ON BTM, 2600 PSI OFF BTM, 90 RPM ROTARY, 250 RPM MOTOR. WHILE MAKING CONNECTION AND TAKING DIRECTIONAL SURVEY DRILLER OBSERVED FLOW INDICATION. TOP PIPE RAMS WERE SHUT-IN. SICP 140 PSI. SIDDP 20 PSI ON CHOKE PANEL GAUGES. LINED UP CHOKE MANIFOLD, OPENED HCR VALVE. DUE TO CONCERNS OVER TOP DRIVE FREEZE-UP IT WAS DECIDED TO Printed: 11/1912001 10:04:11 AM :: : ": ,,- , ,:, ' "i , " ~'- - - ,-, Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: { , 0, { Page 11 of 25 ',' - ' , :' BP' EXPLORATION " OperationsSommary Report . MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 10/23/2001 23:30 - 00:00 Date:,;Fr°Il'l::'To ¡Hours ~ctivity Code NPT'" Phase' , ' : ' ":Qescription otOperations , " 10/24/2001 00:00 - 03:00 03:00 - 06:00 06:00 - 12:00 12:00 - 16:30 16:30 - 20:00 20:00 - 22:30 22:30 - 00:00 10/25/2001 00:00 - 02:00 02:00 - 02:30 02:30 - 07:00 0.50 DRILL 3.00 DRILL 3.00 DRILL 6.00 DRILL 4.50 DRILL 3.50 DRILL 2.50 DRILL 1.50 DRILL 2.00 DRILL 0.50 DRILL 4.50 DRILL P PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 INITIATE CIRCULATION AND RAISE MUD WEIGHT TO KILL WEIGHT OF 9.5 PPG. (KICK CALCULATED AT .1 PPG BASED ON INITIAL PRESSURE OBSERVATIONS). 6 BBL PIT GAIN REPORTED. SIDPP-20 PSI. SICP 140 PSI. 6 BBL PIT VOLUME INCREASE(KICK VOLUME 6 BBL) OBSERVED BY DRILLER. DRILLPIPE PICKED UP OFF BOTTOM AND CLOSE UPPER PIPE RAMS IN MIDDLE OF JOINT. WELL CONTROL CALCULATIONS INDICATE A 0.1 PPG KICK. START PUMPING THROUGH THE CHOKE WITH 9.2 PPG MUD IN THE SURFACE SYSTEM USING THE DRILLER'S METHOD AT 20 SPM WHILE WEIGHTING UP TO 9.4 PPG. MUD LOSSES AT 60-100 BBLS/HOUR. SHUT DOWN PUMP AND CLOSED CHOKE. 260 PSI SIDPP AND 340 PSI SICP READINGS. WELL CONTROL CALCULATIONS YIELDED 1.4 PPG INFLUX. ORDER 500 BBLS MUD FROM MIXING PLANT. CONTINUED CIRCULATING 10 BBL MUD EVERY 15 MINUTES THROUGH TOP DRIVE TO PREVENT FREEZE-UP WHILE WAITING ON MUD. MIX 10.5 PPG KILL MUD IN SURFACE SYSTEM. PUMPING 20 SPM, 9.5 MW, CIRCULATING GAS CUT MUD OUT & LOSING 60 BPH. SHUT WELL IN. 450 SIDPP, 360 SICP. CONTINUE PUMPING 9.5 PPG MUD. MIXING 10.5 PPG KILL MUD. SHUT DOWN PUMP, CLOSED CHOKE, BLEED DOWN STAND PIPE PRESSURE AND AFTER 15 MINS PRESSURES STABILIZED AT 310 SIDPP WITH 350 SICP. EXECUTING 10.5 PPG KILL MUD PUMP SCHEDULE AT 20 SPM. LOSING 75 BBL MUD PER HOUR. ADDING LCM AT 5 PPB. DECREASE KILL RATE TO 15 SPM ON KILL SCHEDULE IN AN EFFORT TO CURTAIL MUD LOSSES. CONTINUING WITH 10.5 PPG KILL MUD CIRCULATION. LOSING 60 BBL PER HR. ADDING LCM AT 5 PPB. CONTINUE WITH 10.5 PPG WELL KILL SCHEDULE AT 15 SPM KILL RATE. SURFACE TO SURFACE STROKE TOTAL 4292 STKS. PUMPED 6200 STROKES AND FINALLY HAD 10.5 PPG KILL MUD RETURN FLOW. LOST 183 BARRELS TOTAL MUD DURING THIS KILL CIRCULATION. SHUT PUMPS & CLOSED CHOKE. RELEASED TRAPPED DRILLPIPE PRESSURE. ALLOWED PRESSURES TO STABILIZE AND RECORDED 230 SIDP & 310 SICP. RELIEVED DRILLSTRING PRESSURE AND ALLOWED TO STABILIZE AGAIN. RECORDED 170 PSI SIDP AND 300 PSI SICP AFTER 30 MINS. KILL MUD WEIGHT CALCULATED AT 11.4 PPG AT 3681 TVD, 10.5 PPG MW, AND 850 PSI SLOW PUMP RATE(20 SPM) CIRCULATING PRESSURE. ADDING 5 PPB LCM (BAROFIBRE) RESUME PUMPING 10.5 PPG MUD AT 20 SPM. BEGAN BUILDING 11.0 PPG MUD WEIGHT IN SURFACE SYSTEM IN PREPARATION FOR NEXT KILL CIRCULATION. 10.5 Printed: 11/1912001 10:04:11 AM " .. " , "- ' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ( f Page 12 of 25 " BPEXPLORATION', O-perations Summary Report ' MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Start: Rig Release: Rig Number: , Phase , " ,Date ,'From.<To Hours' Activity Code NPT N DPRB PROD1 10/25/2001 02:30 - 07:00 07:00 - 09:30 09:30 - 15:00 15:00 - 15:30 15:30 -17:00 17:00 - 22:30 22:30 - 00:00 10/26/2001 00:00 - 01 :30 01 :30 - 02:00 02:00 - 04:00 04:00 - 04:30 ,,' 4.50 DRILL 2.50 DRILL 5.50 DRILL 0.50 DRILL 1.50 DRILL 5.50 DRILL 1.50 DRILL 1.50 DRILL 0.50 DRILL 2.00 DRILL 0.50 DRILL N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 N DPRB PROD1 , . 10fi/2001 11/14/2001 Spud Date: 10fi/2001 End: 11/14/2001 , , DescriptionofOperatións' ,,- '" " ,.- PPG MUD IN AND OUT. CIRCULATING AT 1100 PSI, 20 SPM. CIRCULATE 10.5 PPG MUD AT 20 SPM, 1070 PSI, 120 PSI CHOKE MANIFOLD PRESSURE(ANNULUS). FULL MUD RETURNS METERED. CONTINUED BUILDING 11 PPG KILL MUD IN SURFACE PITS. STOPPED PUMP & CLOSE CHOKE. RECORDED 170 PSI SIDP 300 PSI SICP. KILL MUD WEIGHT AGAIN CALCULATES TO 11.4 PPG. START PUMPING 11 PPG MW AT 20 SPM, 1060 PSI, 200 PSI ON THE CHOKE. AFTER 1870 STKS RECORDED 1040 PSI WITH CHOKE FULL OPEN. MUD LOSSES REPORTED AT 8 BPH. PUMPED 220 BBL OVER CALCULATED SURFACE TO SURFACE VOLUME AND MUD WEIGHT OUT STILL RECORDED AT 10.6 PPG. NOTED CHLORIDES MEASUREMENT DROPPED FROM 79000 PPM TO 39000 PPM. STOPPED PUMP & CLOSED CHOKE. RECORDED 70 PSI SlOP & 200 PSI SICP. KILL MUD WEIGHT CALCULATES TO 11.4 PPG. RESUME 20 SPM CIRCULATION WITH 11.0 PPG MUD WEIGHT WHILE BUILDING 11.5 PPG KILL MUD IN SURFACE PITS. ADDING 5 PPB LCM (BAROFIBRE) ICP 1170 PSI. AT 360 BBLS OVER SURFACE TO SURFACE VOLUME RETURN MUD FINALLY OBSERVED WEIGHING 11.0 PPG. CHLORIDES 63000 PPM. STOPPED PUMP & CLOSE CHOKE. PUMP 11.5 PPG MUD PER KILL SCHEDULE AT 1150 PSI INITIAL CIRCULATING PRESSURE CHOKE PRESSURE 10 PSI AT 20 SPM. INCREASED RATE TO 25 SPM. CIRCULATING PRESSUE 1260 PSI WITH CHOKE FULL OPEN. OBSERVING MUD WEIGHT INCREASING TO 11.3 PPG APPROXIMATELY 2000 STROKES PAST SURFACE TO SURFACE VOLUME. OBSERVING 11.5 KILL MUD WEIGHT IN RETURN FLOW. PUMPING AT 2.5 BPM & RETURNS MEASURED AT 1.7 BPM. CONTINUE CIRCULATING 11.5 PPG KILL MUD AT 25 SPM THROUGH FULL OPEN CHOKE AT 1290 PSI STANDPIPE PRESSURE. 0 PSI CHOKE PRESSURE. ADDING BARAFIBRE LCM AT 5-10 PPB. GAS CUT MUD IN RETURN FLOW. 11.5 PPG IN AND 11.4+ PPG OUT. SHUT IN PUMP AND CLOSE CHOKE. RELEASE TRAPPED PRESSURE FROM DRILLSTRING AND ALLOW PRESSURES TO STABILIZE FOR 30 MINS. RECORDED 20 PSI SIDP AND 170 PSI SICP. 800 BBL OF 11.5 KILL MUD PUMPED BEYOND THE SFC TO SFC VOLUME ON THE KILL SCHEDULE. RESUME PUMPING 11.5 PPG KILL MUD AT 25 SPM THROUGH FULL OPEN CHOKE AT 1280 PSI SPP. 2.5 BPM IN AND 2.0 BPM OUT. 30 BPH MUD LOSSES TO WELLBORE. SHUT DOWN PUMP & CLOSE CHOKE. RELEASE TRAPPED PRESSURE AND ALLOW PRESSURES TO STABILZE IN 30 MINS TO 10 PSI SIDP & 170 PSI SICP. Printed: 11/1912001 10:04:11 AM - '"BP,EXPLORA TION Operatiolis'Summary ,Report. ( , ' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Date' ",' From.;To-Hours', Activity Code :NPTPhase' , : " " , 10/26/2001 04:00 - 04:30 0.50 DRILL N DPRB PROD1 04:30 - 05:00 0.50 DRILL DPRB PROD1 N 05:00 - 06:00 1.00 DRILL DPRB PROD1 N 06:00 - 10:30 4.50 DRILL N DPRB PROD1 10:30 -12:00 1.50 DRILL N DPRB PROD1 12:00 - 15:00 3.00 DRILL N DPRB PROD1 15:00 - 17:00 2.00 DRILL DPRB PROD1 N 17:00 - 00:00 7.00 DRILL DPRB PROD1 N 10/27/2001 00:00 - 07:00 7.00 DRILL N DPRB PROD1 07:00 - 12:00 5.00 DRILL DPRB PROD1 N 12:00 -17:30 5.50 DRILL DPRB PROD1 N 17:30 - 19:30 19:30 - 00:00 2.00 DRILL 4.50 DRILL N N DPRB PROD1 DPRB PROD1 (' , , . Page'13,'of25. Start: 10n/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 10n/2001 End: 11/14/2001 ., , :~,DescriptionofOperations' ,- ' 15100 STKS PUMPED THIS CIRCULATION FOR 1077 BBLS PUMPED BEYOND SFC TO SFC VOLUME. 11.5 PPG IN & 11.4 PPG+ GAS CUT MUD RETURNS. WELL CONTROL CALCULATIONS INDICATE AN 11.6 PPG MUD WEIGHT REQUIREMENT. RESUMED CIRCULATION AT 25 SPM. BEGIN WEIGHT UP TO 11.6 PPG KILL MUD WEIGHT. ORDERED OUT 300 BBLS 11.6 PPG MUD (BARITE, BARAZAN, STARCH). LOSING 36 BPH TO WELLBORE. STARTED 11.6 PPG KILL MUD AT 25 SPM AND RE-SET STROKE COUNTER. LOSING 30 BPH MUD. PUMPING 11.6 PPG KILL MUD AT 20 SPM. LOSSES SLOWED. STOPPED PUMPS & CLOSED CHOKE. 0 PSI SIDP & 140 PSI SICP. CONTINUE PUMPING 11.9 PPG KILL MUD AT 20 SPM. PUMPING 11.9 PPG KILL MUD AT 17 SPM. SHUT IN PUMP AND CHOKE AND RECORDED 0 PSI SIDP & 140 PSI SICP. CONTINUE PUMPING AT 17 SPM. SHUT IN PUMP AND CHOKE AND RECORDED 0 PSI SIDP & 0 PSI SICP. OPEN PIPE RAMS. NO FLOW. BEGIN CIRCULATING 11.9 PPG MUD THROUGH FLOW LINE. BLOW DOWN CHOKE AND GAS BUSTER. BEGIN WORKING DRILL PIPE & ATTEMPT TO FREE UP STUCK BHA. PUT 6000 - 9000 FT-LBF TORQUE IN PIPE & SLACK OFF WEIGHT (TORQUE AND SLUMP). WORK PIPE TO MAXIMUM 374,000 LBF WEIGHT INDICATOR(80% TENSILE PLUS TOP DRIVE WEIGHT). STROKING PIPE MAX 8 FT. CIRCULATING 10 SPM & 1050 PSI. (NEW SLOW PUMP RATE & PRESSURE). 11.9 PPG MW IN 11.5 PPG MUD WEIGHT OUT. 1 BPM IN WITH NO RETURNS. PUMPING 10 BBLS EVERY 15 MINS TO PREVENT SURFACE LINE FREEZING. CONTINUE WORKING DRILL PIPE & ATTEMPT TO FREE UP STUCK BHA. 6000 - 9000 FT-LBF TORQUE IN PIPE & SLACK OFF WEIGHT (TORQUE AND SLUMP). WORK PIPE TO MAXIMUM 374,000 LBF WEIGHT INDICATOR(80% TENSILE PLUS TOP DRIVE WEIGHT). STROKING PIPE MAX 8 FT. CIRCULATING 10 SPM & 1050 PSI. (NEW SLOW PUMP RATE & PRESSURE). 11.9 PPG MW IN 11.5 PPG MUD WEIGHT OUT. 1 BPM IN NO RETURNS. PUMPING 10 BBLS EVERY 15 MINS TO PREVENT FREEZING SURFACE LINES WAIT ON SCHLUMBERGER WIRE LINE. SERVICE TOP DRIVE, CROWN, & BLOCKS. LAY DOWN 2 SINGLES. CIRCULATE ACROSS TOP OF WELL. INSTALL DP SAFETY(TIW) VALVE. RU SCHLUMBERGER WIRELINE. SPOT TRUCK & TRAILER. HANG SHEAVES. RU 5000PSI LUBRICATOR W/ GREASE HEAD. REPAIR E-LINE & CONNECTOR HEAD. MU WIRELINE BOPE. MU 2.125" CHEMICAL CUTTER. START IN HOLE WITH CHEMICAL CUTTER. PUMPED Printed: 11/19/2001 10:04:11 AM (' ,,' (' ,; " ",> , :, "", 'BP EXPLORATION" Operations:,Summary Report MPI-12 MPI-12 DRILL +COMPLETE Start: NABORS Rig Release: NABORS 22E Rig Number: , . " , ',' I Date.. " From~To HoUrs, Activity Code NPT «phase"; , ,'" " , "" , ' , ' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 1 0/27/2001 4.50 DRILL DPRB PROD1 19:30 - 00:00 N 10/28/2001 1.50 DRILL STUC PROD1 00:00 - 01 :30 N 01 :30 - 07:00 STUC PROD1 5.50 DRILL N 07:00 - 08:00 1.00 DRILL STUC PROD1 N 08:00 - 10:00 2.00 DRILL STUC PROD1 N 10:00 -17:15 7.25 DRILL STUC PROD1 N 17:15 - 20:15 STUC PROD1 3.00 DRILL N 20:15 - 22:00 1.75 DRILL N STUC PROD1 ,,' Page 14: of 25 10n/2001 11/14/2001 Spud Date: 10n/2001 End: 11/14/2001 " ' , ~" Description of Operations , " TOOL DOWN DRILLPIPE AT 2.5 BPM, 1400 PSI DOWN TO 10400 FT. LOG CCL UP & CUT 31/2" DRILLPIPE AT +/- 10250'. CUTTER POSITIONED 6' BELOW TOOLJOINT. TOOL ENERGIZED TO INITIATE CUT. START PULLING WIRELINE OUT OF HOLE. LOST 180 BBLS 11.9 PPG MUD TO WELLBORE. NO RETURN CIRCULATION. POOH WITH CHEMICAL CUTTER-CCL TOOL ON E-LiNE WITH APPROX 400 LBS LINE TENSION. TOOL HUNG UP AT 767 FT AND LINE TENSION INCREASED TO 1300 LBS(ROPE SOCKET PULLS OUT AT EST'D 1400 LBS). SCHLUMBERGER CREW SUSPECTS THAT ANCHOR DOGS ARE DRAGGING. PUT MUD PUMP ON LINE AND PUMPED AT 2.5 BPM 1400 PSI. TOOL STARTED MOVING AS DOGS APPARENTLY RETRACTED WITH INCREASED EXTERNAL PRESSURE. PULLED CUTTING TOOL INTO LUBRICATOR. DRAINED LUBRICATOR, FOUND CUTTING TOOL ANCHOR DOGS STUCK IN TOP TOOL JOINT. PULLED CHEMICAL CUTTER/CCL TOOL UP USING BLOCK HANGING WINCH. RELEASE PRESSURE INSIDE TOOL AND EXPANDED DOGS WERE REMOVED. TOOL WAS LAYED OUT DOWN BEAVER SLIDE BY SCHLUMBERGER PERSONNEL TO SECURE AND DISASSEMBLE. RIG CREW NOTICED CHEMICAL ODOR ENTERING RIG FROM GROUND LEVEL WHERE SCHLUMBERGER TRUCK WAS WORKING ON CHEMICAL CUTTING TOOL. RIG PERSONNEL WERE EVACUATED TO SAFE BRIEFING AREA. BP PERSONNEL IMMEDIATELY MET WITH SCHLUMBERGER AND DETERMINED THAT A BROMINE TRIFLUORIDE CHEMICAL LEAK WAS IN PROGRESS AT THE "UN-FIRED" CUTTING TOOL CHEMICAL CYLINDER WHERE IT WAS LA YED OUT ON LOCATION. NOTIFICATIONS WERE MADE. SAFETY STAND DOWN. INVESTIGATE INCIDENT. WARM UP SCHLUMBERGER CHEMICAL CYLINDERS. WARM UP MUD IN PITS TO 70 F. RUN IN WITH 2 1/8" CHEMICAL CUTTER AND CCL. PUMP TOOLS DOWN DRILL PIPE WITH NO RETURNS. LOST 140 BBL MUD TO FORMATION. MADE CUT AT 10252' E-LiNE MEASUREMENT. SURFACE INDICATIONS THAT TOOL FIRED AND PIPE SEVERED. POH WITH E-LiNE AND CHEMICAL CUTTER. TOOL HUNG UP AT 1945 FT. RU AND PUMP DOWN DRILL PIPE WITH 3.5 BPM AND 1200 PSI. NO RETURNS. SUSPECT THAT ANCHOR DOGS DRAGGING IN TOOL JOINT AS INDICATED BY INCREASED DRAG ACROSS EACH TOOL JOINT. PULLING TOOL WITH 400-700 LBS DRAG WITH PUMP ON DRILLPIPE AT 3.5 BPM, 1200 PSI. NO RETURNS. WITH THE TOOL AT RIG FLOOR AND STUCK IN THE TOP TOOL JOINT, DRAINED AND PICKED UP LUBRICATOR. VENT PRESSURE FROM CUTTING TOOL, ANCHOR DOGS RETRACTED AND REMOVED FROM TOOL. PULLED CHEMICAL CUTTER AND CCL TOOL UP USING BLOCK Printed: 11/1912001 10:04:11 AM ,,"'Date' , From,- To Hours Activity Code NPT ¡'Phase, ". Description of Operations " , ' \, . '," 10/28/2001 20:15 - 22:00 1.75 DRILL N STUC PROD1 HANGING WINCH. LAYED CHEMICAL CUTTER-CCL OUT SLIDE AND STARTED TO CLEAR THE RIG FLOOR. STUC PROD1 CLEARED FLOOR. RIG DOWN SCHLUMBERGER SHEAVES & LINES. LOWERED BLOCKS AND PICKED UP ON DRILLPIPE. FOUND DRILLPIPE CUT AND SEVERED. CONTINUE RIGGING DOWN SCHLUMBERGER E-LiNE EQUIPMENT. PREPARING TO TOOH W/ +/- 10250 FT DRILLPIPE & CUT-OFF JOINT. STUC PROD1 RIG DOWN SCHLUMBERGER E-LiNE EQUIPMENT. PREPARE TO POH WITH CUT OFF DRILLPIPE. STUC PROD1 ENGAGE TOP DRIVE ATTEMPT TO CIRCULATE. PUMP 50 BBL AT 2 BPM WITH MINIMAL RETURNS. LOST 45 BBL. STUC PROD1 POH TO 9200'. HOLE FILL NOT CORRECT. FLOW CHECK, WELL STATIC. POH PUMPING OUT EVERY 3 STANDS. RREP PROD1 REPAIR PURGE/COOLING AIR BLOWER ON TOP DRIVE. STUC PROD1 POH. HOLE FILL CORRECT. ANNULUS FALLING VERY SLOWLY. RECOVERED 110 1/3 STANDS AND 3' CUT-OFF. CHEMICAL CUTTER MADE A CLEAN CUT. TOP OF FISH AT 10,256' DRILLER'S STEEL LINE MEASUREMENT(SLM). MAKE UP OVERSHOT ASSEMBLY. RIH TO 977 FT. CIRCULATE W/ FULL REURNS 2 BPM 250 PSI. RIH TO 2863 FT. CIRCULATE LOST CIRCULATION MATERIAL(HEAVY SLUDGE) FROM WELLBORE. 3 BPM, 350 PSI W/ FULL RETURNS. RIH TO 3761 FT. CIRCULATE 3 BPM, 350 PSI, FULL RETURNS. CONTINUE TO CIRCULATE UNTIL LCM SLUDGE CLEARS UP OVER SHAKER SCREENS. RIH TO 4686 FT. CIRCULATE 3 BPM 375 PSI. CIRCULATE UNTIL LCM CLEARED UP OVER SHAKER SCREENS. REPAIR BLOWER MOTOR ON TOP DRIVE. .., ," , " .. " Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 22:00 - 00:00 10/29/2001 00:00 - 01 :00 01:00 - 01:30 01 :30 - 08:00 08:00 -11:00 11:00 -13:30 13:30 - 16:30 16:30 -18:00 18:00 - 20:00 20:00 - 22:00 22:00 - 00:00 10/30/2001 00:00 - 01 :00 01 :00 - 02:00 02:00 - 03:00 03:00 - 03:30 03:30 - 04:30 04:30 - 08:30 08:30 - 10:00 10:00 -10:30 10:30 - 13:00 ,BP EXPLORATION' " Operations Summary Report , " , MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E 2.00 DRILL 1.00 DRILL 0.50 DRILL 6.50 DRILL 3.00 DRILL 2.50 DRILL 3.00 DRILL 1.50 DRILL 2.00 DRILL 2.00 DRILL 2.00 DRILL 1.00 DRILL 1.00 REMCM N 1.00 REMCM N 0.50 REMCM- N 1.00 REMCM N 4.00 REMCM N 1.50 REMCM- N 0.50 REMCM N 2.50 REMCM N N N N N N N N STUC PROD1 N STUC PROD1 N STUC PROD1 N STUC PROD1 N RREP PROD1 N RREP PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 {' Page 150f25 " Start: 10n/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 10n/2001 End: 11/14/2001 REPAIR BLOWER MOTOR ON TOP DRIVE. RIH FROM 4686' TO 5750'. CIRCULATE AT 5 BPM 900 PSI. CIRCULATE AND CLEAN UP MUD OVER SHAKERS. RIH FROM 5750' TO 6780'. CIRCULATE AT 5 BPM 1000 PSI. CIRCULATE AND CLEAN UP MUD OVER SHAKERS. RIH FROM 6780' TO 10,230'. CIRCULATE AT 7806',8835' AND 10,230' CIRCULATE AT 5 BPM 1100 PSI. CIRCULATE AND CLEAN UP MUD OVER SHAKERS. NO MUD LOSSES. OBTAIN SLOW PUMP RATE AT 10, 20 AND 30 SPM. WASH OVER TOP OF FISH AT 10,256' PUMPING AT I BPM WITH 970 PSI. ESTABLISH CIRCULATION THROUGH FISH. CIRCULATE MUD FROM BOTOM TO TOP OF FISH DEPTH. INCREASE PUMP RATE TO 4 BPM WITH 2000 PSI. LOSING MUD AT 60 BPH. PULL OFF FROM FISH AND CIRCULATE MUD FROM TOP OF FISH TO SURFACE AT 3 BPM WITH 920 PSI. LOST 56 BBL MUD. Printed: 11/1912001 10:04:11 AM ( Page 16 ôf25 " , ',BP EXPLORATI0N" ':'Operati 0 nsS urn rnaryRepo rt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 ,Date:~.:: From-To 'Hours, ACti~~ty CodeNPT STUC PROD1 " Description of Operation s , - 'I';' , ." 10/30/2001 13:00 - 13:30 0.50 REMCM N 13:30 - 14:00 0.50 REMCM N 14:00 - 15:30 1.50 REMCM N 15:30 - 16:00 0.50 REMCM N 16:00 - 17:00 1.00 REMCM N 17:00 - 18:30 1.50 REMCM N STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 STUC PROD1 18:30 - 21 :30 3.00 REMCM N STUC PROD1 21 :30 - 22:30 1.00 REMCM N STUC PROD1 22:30 - 00:00 1.50 DRILL N STUC PROD1 10/31/2001 00:00 - 03:30 3.50 DRILL N STUC PROD1 03:30 - 07:30 4.00 DRILL N STUC PROD1 07:30 - 09:00 1.50 DRILL N STUC PROD1 09:00 - 09:30 0.50 DRILL N STUC PROD1 09:30 - 10:30 1.00 DRILL N STUC PROD1 10:30 - 11 :30 1.00 DRILL N STUC PROD1 11 :30 - 12:00 12:00 - 12:30 0.50 DRILL 0.50 DRILL 12:30 - 17:00 4.50 DRILL 17:00 - 21 :30 4.50 DRILL N N STUC PROD1 STUC PROD1 N STUC PROD1 N STUC PROD1 21 :30 - 22:30 1.00 DRILL N STUC PROD1 22:30 - 23:00 0.50 DRILL N STUC PROD1 23:00 - 00:00 1.00 REMCM N STUC PROD1 POH ONE STAND, MAKE UP 15' PUP JOINT AND RIH TO TOP OF FISH. RIG UP HALLIBURTON CEMENT LINES. HOLD PJSM WITH CEMENTING CREW AND RIG CREW. PUMP 5 BBL KCL WATER - TEST LINES TO 3000 PSI.- PUMP 15 BBL KCL WATER - PUMP 110 BBLS (540 SACKS) OF 15.8 PPG CLASS 'G' CEMENT WITH THE FOLLOWING ADDITIVES 0.2% HALAD-344 (FLUID LOSS), 0.25% CFR-3 (DISPERSANT) - PUMP 10 BBL FRESH WATER - SHUT DOWN AND TURN OVER TO RIG DISPLACE WITH 61 BBLS 12.0 PPG BARADRILL MUD AT 4 BPM WITH 3160 PSI. POH WITH (1) SINGLE - BREAK DOWN CEMENT LINE - CONTINUE TO POH STANDING BACK IN MAST (5) STANDS - RIG UP TO REVERSE CIRCULATE REVERSE CIRCULATE CEMENT 15 BBLS CEMENT BACK TO SURFACE - SHUT DOWN OPEN ANNULAR AND MONITOR WELL (STATIC) - BLOW DOWN KILL LINE - DROP DRILL PIPE I.D. WIPER AND CIRCULATE BOTTOMS UP - PUMP DRY JOB - RIG DOWN CIRCULATING LINES - BLOW DOWN MUD LINE POH WITH 3 1/2" DRILL PIPE & BAKER OIL TOOLS BREAK AND LAY DOWN BAKER OIL TOOLS - CLEAR RIG FLOOR PICK UP 6 1/8" BIT (OPEN), CASING SCRAPER, (9) 4 3/4" DRILL COLLARS, JARS, (18) 3 1/2" HWDP CHANGE OUT BALES AND RIH WITH BIT AND SCRAPER FROM 860' TO 9227' PJSM CHANGE OUT 1 3/8" DRILLING LINE TO NEW SPOOL CONTINUE TO RIH FROM 9,227' TAG CEMENT AT 10,230' WASH AND ROTATE FROM 10.230' TO 10,256' TAG TOP OF FISH CIRCULATE BOTTOMS UP FOR CASING TEST RIG UP TO TEST CASING - MAXIMUM PRESSURE ACHIEVED 610 PSI. BLED BACK TO 250 PSI. - ATTEMPT TO TEST (5) TIMES TOTAL FLUID PUMPED AWAY (14) BBLS. CIRCULATE BOTTOMS UP AND CONDITION MUD HOLD PRE-JOB SAFETY MEETING - ESTABLISH INJECTION RATE INTO FORMATION FOR FUTURE CEMENTI NG OPERATION MONITOR WELL BORE (STATIC) - PUMP DRY JOB - BLOW DOWN TOP DRIVE AND MUD LINE - POH WITH 3 1/2" DRILL PIPE STAND BACK IN MAST - LAY DOWN JARS, FLOAT SUB, CASING SCRAPER, AND BIT - CLEAR RIG FLOOR PICK UP RUNNING TOOL AND EZSV RETAINER - RIH WITH (18) JOINTS OF 31/2" HWDP AND 31/2" DRILL PIPE FROM MAST TO 10,152' CHANGE OUT BALES FOR LONG SET TO ENABLE USAGE OF TIW VALVE AND HEAD PIN - PICK UP 10' PUP JOINT RIH TO 10,251' - MAKE UP SAFETY VALVE, HEAD PIN, AND CIRCULATING HOSE SET EZSV RETAINER AT 10,246' - SHEAR OFF AND Printed: 11/1912001 10:04:11 AM ( ( , , ' BP EXPLORATION Page 17 of 25 Operations: Summary Report Legal Well Name: MPI-12 Common Well Name: MPI-12 Spud Date: 1017/2001 Event Name: DRILL +COMPLETE Start: 1017/2001 End: 11/14/2001 Contractor Name: NABORS Rig Release: 11/14/2001 Rig Name: NABORS 22E Rig Number: Date"" ,From ~To :Hours Activity Code NPT ,' Phase Description of Operations .. , .. 10/31/2001 23:00 - 00:00 1.00 REMCM N STUC PROD1 UNSTING - SLACK OFF 20K AND VERIFY PLACEMENT - TEST CASING AT 1,000 PSI. FOR 15 MINUTES (GOOD TEST) 11/1/2001 00:00 - 02:00 2.00 REMCM N STUC PROD1 HOLD PRE-JOB SAFETY MEETING - SWAP OVER TO HALIBURTON ENERGY SERVICES - PUMP 5 BBL. MUD - TEST SURFACE EQUIPMENT AT 4,000 PSI. - STING INTO RETAINER AND ESTABLISH INJECTION RATE WITH 5 BBL. 12.0 PPG MUD AT 1 BPM WITH 950 PSI. SHUT DOWN FORMATION HOLDING 350 PSI. BLEED TO 0 PSI. & UNSTING FROM RETAINER - PUMP 10 BBL. FRESH WATER - 10.2 BBL. 15.8 PPG CEMENT AT 4 BPM WITH 1,700 PSI. WHILE HOLDING 200 PSI. BACK PRESSURE WITH CHOKE MANIFOLD - PUMP 5 BBL. FRESH WATER BEHIND CEMENT & DISPLACE WITH 53.3 BBLS.12.0 PPG MUD - STING INTO RETAINER INCREASE PRESSURE ON BACK SIDE TO 500 PSI. - PUMP 10 BBL MUD AND 6.5 BBL WATER AT 1 BPM WITH 770 PSI. 02:00 - 02:30 0.50 REMCM" ~N STUC PROD1 UNSTING FROM RETAINER - REVERSE CIRCULATE 1 BBL. CEMENT TO SURFACE 02:30 - 03:00 0.50 REMCM N STUC PROD1 RETEST CASING AND EZSV TO 1,000 PSI. (TEST GOOD) 03:00 - 04:30 1.50 REMCM" N STUC PROD1 DISPLACE WELL TO 9.2 PPG BARADRIL MUD - PUMP DRY JOB & BLOW DOWN SURFACE EQUIPMENT 04:30 - 09:30 5.00 REMCM N STUC PROD1 POH WITH EZSV RUNNING TOOL. 09:30 - 10:30 1.00 DRILL P PROD1 HOLD PRE-JOB SAFETY MEETING - PULL WEAR RING AND INSTALL TEST PLUG 10:30 -11:30 1.00 DRILL P PROD1 RIG UP BOP TESTING EQUIPMENT - FILL BOP STACK, CHOKE MANIFOLD, AND TEST JOINT WITH WATER 11 :30 - 18:00 6.50 DRILL P PROD1 TEST BOP AND RELATED EQUIPMENT - UNABLE TO GET HIGH PRESSURE TEST ON ANNULAR PACKING ELEMENT - TEST CHOKE MANIFOLD, MANUAL & HCR VALVES ON CHOKE AND KILL LINE'S, FULL OPENING SAFETY VALVE & DART VALVE, UPPER & LOWER IBOP VALVES ON TOP DRIVE, UPPER AND LOWER PIPE RAMS, BLIND RAMS ALL AT 250 PSI. LOW PRESSURE AND 3,500 PSI. HIGH PRESSURE - PREFORM ACCUMULATOR TEST - CHECK PIT VOLUME TOTALIZER & FLOW SHOW - TEST H2S & LEL GAS DETECTION SYSTEM. *NOTE* TEST WITNESSED BY AOGCC REPRESENTATIVE JOHN CRISP 18:00 - 18:30 0.50 DRILL P PROD1 BLOW DOWN CHOKE MANIFOLD, CHOKE LINE, & KILL LINE 18:30 - 00:00 5.50 DRILL N SFAL PROD1 HOLD PRE-JOB SAFETY MEETING - REMOVE FLOW LINE & RISER - CLEAN ANNULAR - CHANGE OUT PACKING ELEMENT ON 13 5/8 5M MSP HYDRIL ANNULAR PREVENTER 11/2/2001 00:00 - 01 :00 1.00 DRILL N RREP PROD1 RIG UP RISER AND FLOW LINE - INSTALL TEST PLUG - TEST 135/8 5M HYDRIL PACKING ELEMENT AT 250 PSI. LOW AND 2500 PSI. HIGH 01 :00 - 02:00 1.00 DRILL P PROD1 RIG DOWN TEST EQUIPMENT AND INSTALL WEAR RING Printed: 11/1912001 10:04:11 AM (" '\ , BP EXPLORATION' , ' ,;': Page 18 of25 Operations Summary,Report Legal Well Name: MPI-12 Common Well Name: MPI-12 Spud Date: 1017/2001 Event Name: DRILL +COMPLETE Start: 1017/2001 End: 11/14/2001 Contractor Name: NABORS Rig Release: 11/14/2001 Rig Name: NABORS 22E Rig Number: Date" ' From- To 'Hours' Activity Code 'NPT, Phase ,"', , Description of Operations' I' ' , , , 11/2/2001 01 :00 - 02:00 1.00 DRILL P PROD1 AND CLEAR RIG FLOOR 02:00 - 06:30 4.50 STWHIP P PROD1 MAKE UP WINDOW MASTER WHIPSTOCK AND MILLING ASSEMBLY - ORIENT MWD TOOL TO WHIPSTOCK AND RIH WITH BHA 06:30 - 07:30 1.00 STWHIP P PROD1 SERVICE TOP DRIVE, TRAVELING BLOCKS, AND CROWN SHEAVES 07:30 - 13:00 5.50 STWHIP N HMAN PROD1 THAW OUT KELLY HOSE AND TOP DRIVE 13:00 - 13:30 0.50 STWHIP P PROD1 SURFACE TEST MWD TOOL AND KELLY HOSE AT 3,500 PSI. 13:30 - 18:30 5.00 STWHIP P PROD1 RIH WITH 31/2" DRILL PIPE FROM MAST TO 10,186' 18:30 - 19:30 1.00 STWHIP P PROD1 STRING TAKING WEIGHT - ORIENT WINDOW MASTER WHIPSTOCK TO HIGH SIDE AND WASH AND WORK TO TOP OF EZSV AT 10,246'- SET BOTTOM TRIP WHIPSTOCK AT 10,246' AND SHEAR RELEASE BOLT 19:30 - 00:00 4.50 STWHIP P PROD1 ESTABLISH ROTATION AND MILL WINDOW IN 7" CASING- TOP OF WINDOW AT 10,228' AND BOTTOM OF WINDOW AT 10,240' - DRILL AHEAD TO 10,243' - TOP DRIVE RPM 50 -1350 PSI. AT 210 GPM - WEIGHT ON MILL 10K WITH 9K TORQUE - UP WEIGHT 155K - DOWN WEIGHT 8SK - ROTATING WEIGHT 110K 11/3/2001 00:00 - 00:30 0.50 STWHIP P PROD1 CONTINUE TO MILL WINDOW AND NEW FORMATION FROM 10,243' TO 10,252'- RECOVERED (35) LBS. OF METAL DURING MILLING OPERATION 00:30 - 01 :30 1.00 STWHIP P PROD1 PULL INTO 7" CASING & CIRC. BOTTOMS UP WHILE PUMPING SWEEP - MONITOR WELL BORE (STATIC) 01 :30 - 02:00 0.50 STWHIP P PROD1 PERFORM FORMATION INTEGRITY TEST WITH 9.2 PPG MUD (TVD @ 3,709' WITH 348 PSI.) TO OBTAIN 11.0 PPG MUD EQUIVALENT 02:00 - 07:00 5.00 STWHIP P PROD1 PUMP DRY JOB - BLOW DOWN TOP DRIVE AND MUD LINE - TURN TOP DRIVE ROTARY HOSE - POH WITH 31/2" DRILL PIPE 07:00 - 09:30 2.50 STWHIP P PROD1 BREAK AND LAY DOWN BHA - DOWN LOAD MWD AND STAND BACK IN MAST - LAY DOWN MILLING ASSEMBLY 09:30 - 11 :30 2.00 DRILL P PROD1 PICK UP (69) JOINTS OF 31/2" (15.5 LB.) DRILL PIPE AND RIH FOR THIS HOLE SECTION 11 :30 - 12:00 0.50 DRILL P PROD1 CIRCULATE THRU DRILL PIPE TO REMOVE SCALE DEPOSITS 12:00 - 13:00 1.00 DRILL P PROD1 POH WITH 3 1/2" DRILL PIPE AND STAND BACK IN MAST 13:00 - 13:30 0.50 DRILL P PROD1 FUNCTION RAMS ON 135/8 5M BOP AND FLUSH METAL CUTTINGS FROM RAM CAVITIES WITH FLUSHING TOOL 13:30 - 14:30 1.00 DRILL P PROD1 SERVICE TOP DRIVE, TRAVELING BLOCKS, AND CROWN SHEAVES 14:30 - 15:00 0.50 DRILL P PROD1 PULL WEAR BUSHING SERVICE AND REINSTALL 15:00 -17:00 2.00 DRILL P PROD1 MAKE UP BHA (NO. 10) AND ORIENT MUD MOTOR TO MWD TOOL - INITIALIZE MWD AND SURFACE TEST (OK) - BLOW DOWN TOP DRIVE 17:00 - 21:00 4.00 DRILL P PROD1 RIH WITH 31/2" DRILL FROM MAST TO 10,213' FILL DRILL STEM AS NEEDED - BREAK CIRCULATION AND ORIENT MUD MOTOR TO HIGH SIDE 21:00 - 21:30 0.50 DRILL P PROD1 HOLD PRE-RESEVIOR MEETING WITH COMPANY MAN AND DRILLING CREWS - PREFORM KICK DRILL - CHECK SLOW PUMP RATE 21 :30 - 00:00 2.50 DRILL P PROD1 WORK THRU WINDOW TOP AT 10,228' AND BOTTOM AT Printed: 11/1912001 10:04:11 AM '. ' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: .' (' (' ", BP:EXPLORATION'" ,'., Operations Summary Report MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Page 190f 25 Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 1113/2001 21 :30 - 00:00 : Date :From-cTo Hours Activity COde' NPT ,Phase, " ,', " " " , .?:Description of Operations',.'" 11/4/2001 00:00 - 13:00 13:00 - 14:00 14:00 - 00:00 11/5/2001 00:00 - 04:30 04:30 - 06:30 06:30 - 09:00 09:00 - 1 0:00 10:00 - 12:30 12:30 - 14:30 2.50 DRILL PROD1 P 13.00 DRILL PROD1 P 1.00 DRILL N DPRB PROD1 10.00 DRILL P PROD1 4.50 DRILL P PROD1 2.00 DRILL P PROD1 2.50 DRILL P PROD1 1.00 DRILL P PROD1 2.50 DRILL PROD1 P 2.00 DRILL P PROD1 10,240 AND WASH TO BOTTOM AT 10,252' - DIRECTIONAL DRILL AHEAD FROM 10,252' TO 10,336' - (55) SPM AT 2,350 PSI. ON BOTTOM PRESSURE 2,250 PSI. OFF BOTTOM PRESSURE - TORQUE ON BOTTOM 8K WITH 70 RPM - UP WEIGHT 165K, DOWN WEIGHT 92K, ROTATING WEIGHT 115K, WEIGHT ON BIT 15K - CHECK FOR A "NO FLOW" ON CONNECTIONS AND SURVEY'S BEFORE RESUMING PUMPING CONTINUE TO DIRECTIONAL DRILL AHEAD FROM 10,336' TO 10,486' - SWAP MUD OVER TO CLEAN BARADRIL-N SYSTEM ON THE FLY - CONTINUE TO DRILL AHEAD FROM 10,486' TO 11,138' - (55) SPM AT 2,450 PSI. ON BOTTOM PRESSURE 2,300 PSI. OFF BOTTOM PRESSURE - TORQUE ON BOTTOM 6K WITH 80 RPM - UP WEIGHT 130K, DOWN WEIGHT 90K, ROTATING WEIGHT 108K, WEIGHT ON BIT 2K TO 6K - CHECK FOR A "NO FLOW" ON CONNECTIONS AND SURVEY'S BEFORE RESUMING PUMPING TRUCK ON LOCATION WITH 12.0 PPG MUD FOR KILL OPERATION IF NEEDED DUE TO MAGNETIC INTERFERANCE FROM FISH LEFT IN THE HOLE CONSULT WITH TOWN REGUARDING SURVEY IRREGULARITIES - RECIPROCATE AND ROTATE DRILL STRING AND CONDITION MUD CONTINUE TO DRILL AHEAD FROM 11,138' TO 12,070' - (55) SPM AT 2,450 PSI. ON BOTTOM PRESSURE 2,300 PSI. OFF BOTTOM PRESSURE - TORQUE ON BOTTOM 6K WITH 80 RPM - UP WEIGHT 130K, DOWN WEIGHT 90K, ROTATING WEIGHT 108K, WEIGHT ON BIT 2K TO 6K- CHECK FOR A "NO FLOW' ON CONNECTIONS AND SURVEY'S BEFORE RESUMING PUMPING CONTINUE TO DRILL AHEAD FROM 12,070' TO 12,470'- (55) SPM AT 2,450 PSI. ON BOTTOM PRESSURE 2,300 PSI. OFF BOTTOM PRESSURE - TORQUE ON BOTTOM 6K WITH 80 RPM - UP WEIGHT 130K, DOWN WEIGHT 90K, ROTATING WEIGHT 108K, WEIGHT ON BIT 2K TO 6K- CHECK FOR A "NO FLOW" ON CONNECTIONS AND SURVEY'S BEFORE RESUMING PUMPING. FLOW CHECK, WELL STATIC. PUMP HIGH VIS WEIGHTED SWEEP AND CIRCULATE AROUND. NO SIGNIFICENT AMOUNT OF CUTTINGS WITH BOTTOMS UP. SHORT TRIP TO 7" CASING WINDOW. PULL FIRST TWO JOINTS AND WELL SWABBING. PUMP OUT OF THE HOLE TO THE WINDOW. FLOW CHECK, WELL STATIC. BLOW DOWN TOP DRIVE. RIH TO BOTTOM. WASH LAST STAND TO BOTTOM AS PRECAUTION. CIRCULATE AND CONDITION MUD PRIOR TO TRIP OUT FOR LINER - MONITOR WELL STATIC PUMP OUT OF THE HOLE FROM 12,470' TO 10,230 NO PROBLEMS Printed: 11/1912001 10:04:11 AM " , I:, Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: """~..".:.Dåte";, 11/5/2001 14:30 - 18:30 18:30 - 19:00 19:00 - 19:30 19:30 - 22:00 22:00 - 00:00 11/6/2001 00:00 - 01 :45 01 :45 - 02:30 02:30 - 05:30 05:30 - 08:00 08:00 - 09:00 09:00 - 14:00 14:00 - 18:00 18:00 - 22:00 22:00 - 22:30 (" : "'BP EXPLORATION'. "Operations Summary Report MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Hqurs Activity Code' NPT 'Phase 4.00 DRILL P PROD1 0.50 DRILL 0.50 CASE P P PROD1 PROD1 2.50 CASE P PROD1 2.00 CASE P PROD1 1.75 CASE P PROD1 0.75 CASE P PROD1 3.00 CASE P PROD1 2.50 CASE P PROD1 1.00 CASE P PROD1 5.00 CASE P PROD1 4.00 STWHIP P PROD2 4.00 STWHIP P 0.50 STWHIP P PROD2 PROD2 :', "Page200f:29 '^ ';\'::, .. Start: 10/7/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 Description of Operations' .". MONITOR WELL AT "OB" LATERAL WINDOW - PUMP DRY JOB BLOW DOWN TOP DRIVE AND MUD LINES - CONTINUE TO POH TO BHA AT 266' LAY DOWN BHA AND CLEAR RIG FLOOR HOLD PRE-JOB SAFETY MEETING AND RIG UP TO RUN LINER PICK UP AND RIH WITH (58) JOINTS OF 4112" 12.6 LB. L-80 IBT SLOTTED LINER PER PROGRAM - CHANGE ELEVATORS AND CASING TONGS - MAKE UP BAKER FLEX LOCK LINER HANGER AND ZXP PACKER - SERVICE SAME - RIG DOWN CASING TONGS INSTALL STRIPPING RUBBER AND CLEAR RIG FLOOR RUN SLOTTED LINER IN HOLE WITH (65) STANDS 3 1/2" DRILL PIPE FROM MAST CONTINUE TO RIH WITH SLOTTED LINER TO 10,218' NEAR TOP OF THE "OB" LATERAL WINDOW BREAK CIRCULATION AND PUMP DRILL PIPE AND LINER VOLUME AT 25 SPM WITH 700 PSI. RIH WITH SLOTTED LINER THRU OPEN HOLE SECTION TO 10,553' WORK THRU TIGHT SPOT TO 10,583' - CONTINUE TO RIH 12,050' WITH NO PROBLEMS - WORK LINER HARD FROM 12,050' TO 12,357' - RIH TO LINER SHOE SETTING DEPTH AT 12,440' WITH NO PROBLEMS BREAK CIRCULATION - DROP 7/8" BALL AND PUMP TO SEAT WITH 618 STROKES - PRESSURE UP TO 1,650 PSI. TO SET BAKER FLEX LOCK LINER HANGER - SLACK OFF AND VERIFY HANGER SET WITH 25K LBS. WEIGHT - CONTINUE TO PRESSURE UP DRILL PIPE TO 3,150 PSI. TO ACTUATE HYDRAULIC PUSHER TOOL TO SET ZXP PACKER & SHEAR NEUTRALIZER - BLEED PRESSURE TO 0 PSI. AND CLOSE BAG ATTEMPT TO PRESSURE UP TO 500 PSI. TO VERIFY PACKER SETTING (NO GOOD) - PRESSURE UP TO 3,950 PSI TO RELEASE "HR" SETTING TOOL AND BLOW BALL SEAT - SET PACKER MECHANICAL Y BY ROTATING TO THE RIGHT AND SLACKING OFF 25K TO 35K WEIGHT - ATTEMPT TO RETEST ZXP PACKER BACK SIDE TO 500 PSI. lWO MORE TIMES (SECOND TIME TEST GOOD) - BLEED PRESSURE TO 0 PSI. AND OPEN BAG PULL RS. PACK OFF FREE OF BAKER ZXP PACKER - LAY DOWN SINGLE OF 31/2" DRILL PIPE - CIRCULATE BOTTOMS UP AT 10,115' - MONITOR WELL (STATIC)- PUMP DRY JOB BLOW DOWN TOP DRIVE AND MUD LINE - POH WITH BAKER LINER RUNNING TOOL ASSEMBLY AND LAY DOWN SAME - CLEAR RIG FLOOR PICK UP SPACE OUT TUBULARS, WIDOW MASTER WHIPSTOCK, AND MILLING ASSEMBLY - PICK UP MWD TOOL AND ORIENT - INITIALIZE MWD TOOL - CONTINUE TO PICK UP REMAINING BHA AND RIH - SURFACE TEST MWD TOOL RIH WITH WHIPSTOCK ON 3 1/2" DRILL PIPE FROM MAST TAKE SLOW PUMP RATES AND ORIENT WHIPSTOCK TO Printed: 11/1912001 10:04:11 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: t f " '. BP>-.EXPLORATION " .. 'Operations"Summary: Report MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E 11/612001 22:00 - 22:30 Date, . From,~To ,Hours' Activity Code NPT, Phase " " PROD2 22:30 - 00:00 1117/2001 00:00 - 03:00 03:00 - 04:00 04:00 - 04:30 04:30 - 06:30 06:30 - 10:00 10:00 -12:30 12:30 -13:00 13:00 -14:00 14:00 -18:00 18:00 - 18:30 18:30 - 20:00 20:00 - 23:00 0.50 STWHIP P 1.50 STWHIP P PROD2 3.00 STWHIP P PROD2 1.00 STWHIP P PROD2 0.50 STWHIP P PROD2 2.00 STWHIP P PROD2 3.50 STWHIP P PROD2 2.50 STWHIP P 0.50 BOPSU¡:; P 1.00 BOPSUF P PROD2 PROD2 PROD2 4.00 BOPSUF P PROD2 0.50 BOPSUF P PROD2 1.50 DRILL P PROD2 3.00 DRILL P PROD2 Page 21 'of 25 " Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 1017/2001 End: 11/14/2001 ,', Description of Operations , ",' 35 DEGREES LEFT OF HIGH SIDE - SLACK OFF AND LAND THE LOCATOR SEAL ASSEMBLY IN LINER HANGER PACKER BELOW AT 10,128'- SHEAR BOTTOM TRIP ANCHOR AND CONFIRM SETTING - SHEAR RELEASE BOLT - ESTABLISH ROTATION MILL WINDOW FOR "OA" LATERAL - TOP OF WINDOW AT 9,916' AND BOTTOM OF WINDOW AT 9,928' - (7') TOTAL FOOTAGE MILLED AT 00:00 HOURS - TOP DRIVE RPM 80 TO 100 - 2000 PSI. AT 225 GPM - WEIGHT ON MILL 3K TO 6K WITH 8K TORQUE - UP WEIGHT 125K, DOWN WEIGHT 98K, ROTATING WEIGHT 110K CONTINUE TO MILL "OA" LATERAL WINDOW TOP AT 9,916' TO BOTTOM AT 9,928' - MILL NEW FORMATION TO 9,943' - RECOVERED 20 LBS. OF METAL DURING MILLING OPERATION. PULL INTO AND OUT OF 7" CASING AND CIRCULATE BOTTOMS UP WHILE PUMPING SWEEP. MONITOR WELL BORE (STATIC) - PUMP DRY JOB - STAND BACK (1) STAND IN MAST - BLOW DOWN TOP DRIVE AND MUD LINE. CUT AND SLIP 123 FEET OF 1 3/8" DRILLING LlNE- SERVICE TOP DRIVE, TRAVELING BLOCKS, AND CROWN SHEAVES. POH WITH 3 1/2" DRILL PIPE AND MILLING ASSEMBLY TO 850' (BHA) - OBSERVE WELL (STATIC). LAY DOWN BHA & MILLING TOOLS - CLEAR RIG FLOOR. FLUSH BOP STACK WITH MIXING SUB - BLOW DOWN TOP DRIVE AND MUD LINE. PULL WEAR BUSHING & INSTALL TEST PLUG - RIG UP TEST EQUIPMENT. FILL BOP STACK, CHOKE MANIFOLD, AND TEST JOINT WITH WATER - TEST ANNULAR PACKING ELEMENT AT 250 PSI. LOW PRESSURE AND 2,500 PSI. HIGH PRESSURE - TEST CHOKE MANIFOLD, MANUAL & HCR VALVES ON CHOKE AND KILL LINE'S, FULL OPENING SAFETY VALVE & DART VALVE, UPPER & LOWER IBOP VALVES ON TOP DRIVE, UPPER AND LOWER PIPE RAMS, BLIND RAMS ALL AT 250 PSI. LOW PRESSURE AND 3,500 PSI. HIGH PRESSURE - PREFORM ACCUMULATOR TEST - CHECK PIT VOLUME TOTALIZER & FLOW SHOW - TEST H2S & LEL GAS DETECTION SYSTEM. ,... - *NOTE* WITNESS OF TEST WAIVED BY AOGCC REPRESENTATIVE JOHN CRISP RIG DOWN TEST EQUIPMENT - BLOW DOWN TOP DRIVE CHOKE AND KILL LINES - INSTALL WEAR BUSHING MAKE UP PDC BIT PICK UP DRILLING BHA - ORIENT MWD AND MUD MOTOR INITIALIZE MWD AND SUFACE TEST - BLOW DOWN TOP DRIVE RIH WITH BHA NO.12 WITH 31/2" DRILL PIPE FROM MAST Printed: 11/1912001 10:04:11 AM ,', Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: , Datè" ,> 11n/2001 11/8/2001 11/9/2001 11/10/2001 " , t (' Page 22 of 25 '. BPEXPLORATION Operations Summary Report MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 10/7/2001 End: 11/14/2001 From~ To ,Hours Activity Code NPT ,I Phase> 20:00 - 23:00 23:00 - 00:00 00:00 - 00:00 00:00 - 03:30 03:30 - 06:00 06:00 - 09:00 09:00 - 13:00 13:00 - 14:00 14:00 -15:00 15:00 - 19:00 19:00 - 00:00 00:00 - 06:00 06:00 - 08:00 3.00 DRILL 1.00 DRILL P P PROD2 PROD2 24.00 DRILL P PROD2 3.50 DRILL P PROD2 2.50 DRILL P PROD2 3.00 DRILL P PROD2 4.00 DRILL P PROD2 1.00 DRILL P PROD2 1.00 DRILL 4.00 DRILL P P PROD2 PROD2 5.00 DRILL P PROD2 6.00 DRILL P PROD2 2.00 DRILL P PROD2 .. " Description of Operations " TO 9,840' - FILL DRILL STEM AS NEEDED ORIENT MUD MOTOR TO 35 LEFT OF HIGH SIDE AND WORK THRU WINDOW (NO PROBLEMS) - DRILL AHEAD TO 9,988' WHILE PUMPING SPACER AND DISPLACING TO NEW BARADRIL-N MUD ON THE FLY. DIRECTIONAL DRILL AHEAD FROM 9,988' TO 12,210' - TOP DRIVE RPM 80 TO 90 - PUMPING AT 235 GPM ON BOTTOM PRESSURE 2800 PSI. & OFF BOTTOM PRESSURE AT 2600 PSI. - WEIGHT ON BIT 2K TO 12K WITH ON BOTTOM TORQUE AT 5K & OFF BOTTOM TORQUE AT 3K - UP WEIGHT 135K, DOWN WEIGHT 85K, ROTATING WEIGHT 100K. CHECK FOR FLOW ON SURVEYS AND CONNECTIONS BEFORE RESUMING PUMPING OPERATION. DIRECTIONAL DRILL AHEAD FROM 12,210' TO 12,500' - TOP DRIVE RPM 80 TO 90 - PUMPING AT 235 GPM ON BOTTOM PRESSURE 2800 PSI. & OFF BOTTOM PRESSURE AT 2600 PSI. - WEIGHT ON BIT 2K TO 12K WITH ON BOTTOM TORQUE AT 5K & OFF BOTTOM TORQUE AT 3K - UP WEIGHT 135K, DOWN WEIGHT 85K, ROTATING WEIGHT 100K. .... CHECK FOR FLOW ON SURVEYS AND CONNECTIONS BEFORE RESUMING PUMPING OPERATION. PUMP SWEEP AND CIRCULATE HOLE CLEAN WHILE ROTATING AND RECIPROCATING DRILL STRING PUMP OUT OF THE HOLE FROM 12,500' TO 10,010' - SHUT DOWN PUMP AND PULL INTO WINDOW TO 9,800' - MONITOR WELL (STATIC) - PUMP DRY JOB - BLOW DOWN MUD LINE AND TOP DRIVE POH STANDING BACK 3 1/2" DRILL PIPE IN MAST FROM 9,800' TO BHA LAY DOWN BHA NO.12 - DOWN LOAD MWD DATA IN PIPE SHED PICK UP HOLE OPENER AND MAKE UP BHA NO.13 RIH WITH HOLE OPENER TO 9,850' - BREAK CIRCULATION AND CONTINUE TO WASH IN THE HOLE TO 10,010' ALLOWING TOP STRING STABILIZER TO CLEAR "OA" LATERAL WINDOW WASH AND REAM 6 1/8" HOLE AT 400 FPH WITH HOLE OPENER FROM 10,010' TO 11,320' - TOP DRIVE RPM 120- PUMPING AT 300 GPM WITH 2300 PSI. - OFF BOTTOM TORQUE AT 3K - UP WEIGHT 125K, DOWN WEIGHT 90K, ROTATING WEIGHT 110K. WASH AND REAM 6 1/8" HOLE AT 400 FPH WITH HOLE OPENER FROM 11,320' TO 12,500'- TOP DRIVE RPM 120- PUMPING AT 300 GPM WITH 2300 PSI. - OFF BOTTOM TORQUE AT 3K - UP WEIGHT 125K, DOWN WEIGHT 90K, ROTATING WEIGHT 110K. PUMP SWEEP AND CIRCULATE HOLE CLEAN WHILE Printed: 11/1912001 10:04:11 AM .. (' ", BPEXPLORATION ' , ' , ' " Operätiohs\Summary,.:Report ' Page 23 of 25 ',',\ ' ,," . :', Legal Well Name: MPI-12 Common Well Name: MPI-12 Spud Date: 1017/2001 Event Name: DRILL +COMPLETE Start: 1017/2001 End: 11/14/2001 Contractor Name: NABORS Rig Release: 11/14/2001 Rig Name: NABORS 22E Rig Number: : 'Date "From-To' Hours ActivityCope"NPT - Description of Operations, 11/10/2001 06:00 - 08:00 2.00 DRILL P PROD2 ROTATING AND RECIPROCATING DRILL STRING. 08:00 - 12:00 4.00 DRILL P PROD2 MONITOR WELL (STATIC) - LAY DOWN SINGLE OF 31/2" DRILL PIPE - ATTEMPT TO POH 'WELL SWABBING" PUMP OUT OF THE HOLE FROM 12,500' TO 9,793' WITH NO PROBLEMS. 12:00 -13:00 1.00 DRILL P PROD2 MONITOR WELL (STATIC) - CIRCULATE AND PUMP DRY JOB - BLOW DOWN TOP DRIVE AND MUD LINE. 13:00 - 17:00 4.00 DRILL P PROD2 POH WITH 3 112" DRILL PIPE STAND BACK IN MAST. 17:00 -18:00 1.00 DRILL P PROD2 LAY DOWN BHA NO.13 - LAY DOWN HOLE OPENER, (3) STABS, LEAD COLLAR, FLEX COLLARS, DRILLING JARS, AND CLEAR RIG FLOOR. 18:00 - 20:00 2.00 DRILL P PROD2 PICK UP BHA NO.14 - MAKE UP WHIPSTOCK HOOK AND SPERRY MWD TOOLS ORIENT SAME - CONTINUE TO PICK UP BUMPER SUB, OIL JARS, AND (9) SPIRAL 4 3/4" DRILL COLLARS - SURFACE TEST MWD TOOL - BLOW DOWN TOP DRIVE AND MUD LINE. 20:00 - 23:00 3.00 DRILL P PROD2 RIH WITH WHIPSTOCK RETRIEVING HOOK AND BHA ON 3 1/2" DRILL PIPE FROM MAST TO 9,864' 23:00 - 23:30 0.50 DRILL P PROD2 BREAK CIRCULATION AND ORIENT HOOK FOR NO LATCH UP - RECORD UP AND DOWN WEIGHTS - SLACK OFF TO TOP OF WHIPSTOCK AT 9,916' WHILE JETTING OUT SLOT CONTINUE TO SLACK OFF TO 9,921'- SHUT DOWN PUMPS AND PULL ABOVE WHIPSTOCK - ORIENT WITH MWD TO ALIGN LUG WITH WHIPSTOCK FACE LOWER HOOK AND ENGAGE WHIPSTOCK - PICK UP AND CONFIRM HOOK ENGAGED - CONTINUE TO PICK UP TO 210K (82K ABOVE NORMAL UP WEIGHT) RELEASING BOTTOM TRIP ANCHOR ON WHIPSTOCK - MONITOR WELL BORE (STATIC) - PULL WHIPSTOCK UP THE HOLE TO 9,894' HOLE SWABBING 23:30 - 00:00 0.50 DRILL P PROD2 CIRCULATE AND CONDITION MUD 11/11/2001 00:00 - 01 :00 1.00 DRILL P PROD2 CIRCULATE BOTTOMS UP AND CONDITION MUD AFTER UNSEATING WHIPSTOCK - MONITOR WELL BORE (STATIC) 01 :00 - 10:30 9.50 DRILL P PROD2 ATTEMPT TO POH (SLOW) WITH WHIPSTOCK - NO GOOD WELL SWABBING - PUMP OUT OF THE HOLE 10:30 - 13:30 3.00 DRILL P PROD2 LAY DOWN BHA, WHIPSTOCK ASSEMBLY, SPACE OUT JOINTS, AND CROSS OVER SUBS - CLEAR RIG FLOOR 13:30 -14:00 0.50 CASE P PROD2 RIG UP TO RUN 4 1/2" SLOTTED LINER - HOLD PRE-JOB SAFETY MEETING WITH COMPANYMAN AND NABORS PERSONAL REGUARDING LINER RUNNING OPERATION. 14:00 - 17:00 3.00 CASE P PROD2 PICK UP AND RIH WITH (78 JOINTS) 41/2" 12.6 LB. L-80 IBT SLOTTED LINER - PICK UP BAKER WALL HOOK HANGER 17:00 - 19:30 2.50 CASE P PROD2 CONTINUE TO RUN SLOTTED LINER WITH 3 1/2" DRILL PIPE FROM MAST TO TOP OF WINDOW - ESTABLISH ALL UP, DOWN, AND ROTATIONAL WEIGHTS 19:30 - 22:30 3.00 CASE P PROD2 CONTINUE TO ORIENT AND WORK LINER FROM TOP OF "OA" LATERAL WINDOW AT 9,916' TO BAKER ZXP PACKER AT 10,128' - SUCESSFULL AFTER MANY A TTEMPS 22:30 - 23:30 1.00 CASE P PROD2 CONTINUE TO RUN LINER FROM "OA" LATERAL WINDOW AT 9,916' TO 12,436' GUIDE SHOE DEPTH - CHECK UP Printed: 11/1912001 10:04:11 AM .' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: '" ( , BP EXPLORATION ' , Operations Summary Report , , MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Page 24 of 25 Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 10/7/2001 End: 11/14/2001 11/11/2001 22:30 - 23:30 23:30 - 00:00 'Date'-, From ~To Hours Activity Code NPTPhðse' ,.' , , , " " , Description of Operations 11/12/2001 00:00 - 01 :00 01 :00 - 02:00 02:00 - 03:30 03:30 - 04:00 04:00 - 05:30 05:30 - 06:30 06:30 - 07:30 07:30 - 08:30 08:30 - 09:30 09:30 - 19:00 19:00 - 19:30 19:30 - 20:00 20:00 - 00:00 11/13/2001 00:00 - 04:00 04:00 - 05:00 05:00 - 05:30 05:30 - 07:00 1.00 CASE 0.50 CASE PROD2 PROD2 P P 1.00 CASE PROD2 P 1.00 CASE P PROD2 1.50 CASE P PROD2 0.50 CASE PROD2 P 1.50 CASE PROD2 P 1.00 CASE 1.00 CASE PROD2 PROD2 P P 1.00 CASE 1.00 CASE 9.50 CASE 0.50 CASE P P P P PROD2 PROD2 PROD2 PROD2 0.50 CASE PROD2 P 4.00 DRILL PROD2 P 4.00 CASE P PROD2 1.00 CASE PROD2 P 0.50 CASE P PROD2 1.50 CASE P PROD2 AND DOWN WEIGHTS WORK LINER AND ATTEMPT TO ENGAGE BAKER WALL HOOK HANGER INTO LOWER SECTION OF WINDOW AT 9,928' CONTINUE TO ORIENT BAKER WALL HOOK HANGER TO ENGAGE LOWER PORTION OF "OA" LATERAL WINDOW AT 9,928' - AFTER MANY ATTEMPTS HANGER ENGAGED AND LANDED - TOP OF BAKER WALL HOOK HANGER AT 9,906' DISCONNECT TOP DRIVE AND DROP BALL - PUMP TO SEAT WITH 569 STROKES - PRESSURE UP TO 2600 PSI. AND BLEED PRESSURE TO 0 PSI. - VERIFY HYDRAULIC RELEASE TOOL FUNCTIONED BY PICKING UP STRING WEIGHT THEN SLACK BACK DOWN TO 65K - SHEAR OUT BALL SEAT WITH 3,100 PSI. - PICK UP AND STAND BACK ONE STAND IN MAST CLEARING "HR" SETTING TOOL FROM TOP OF WALL HOOK HANGER. CIRCULATE BOTTOMS UP FLUID GAS CUT TO 8.3 PPG - CONTINUE TO CIRCULATE UNTIL GOOD 9.1 PPG MUD BACK TO SURFACE - MONITOR WELL BORE (STATIC) PUMP DRY JOB - BLOW DOWN TOP DRIVE AND MUD LINE. POH FROM 9,833' TO 7,620 - NOT TAKING THE CORRECT AMOUNT OF FILL 4.95 BBLS SHORT (CALCULATED 11.25 BBLS-ACTUAL 6.3 BBLS) MONITOR WELL (STATIC) CIRCULATE BOTTOMS UP RUN IN HOLE TO 9,913' ABOVE TOP OF WALL HOOK HANGER CIRCULATE BOTTOMS UP - BLOW DOWN TOP DRIVE MONITOR WELL FOR 30 MINUTES (STATIC) PUMP OUT OF THE HOLE FROM 9,913' TO 42' LAY DOWN BAKER LINER HANGER RUNNING TOOLS- CLEAR RIG FLOOR - MONITOR WELL BORE (STATIC) HOLD PRE-JOB SAFETY MEETING - LAY DOWN SINGLE IN MOUSEHOLE - PICK UP BAKER BRIDGE PLUG AND RUNNING TOOL RIH WITH BRIDGE PLUG ON 3 1/2" DRILL PIPE FROM MAST - FILL DRILL PIPE AT 30 STANDS IN THE HOLE- CONTINUE TO RIH WITH 4 STANDS TAKING WEIGHT AND PUSHING FLUID DOWNHOLE - WORK BRIDGE PLUG UP AND DOWN AND CONTINUE TO RIH PUSHING FLUID 3.5 BBLS PER STAND AHEAD OF BRIDGE PLUG. CONTINUE RIH WITH BAKER BRIDGE PLUG. PIPE FLOATING UNTIL 42 STANDS WERE IN HOLE. PLUG FREED UP AND GOT FULL RETURNS. CONTINUE RIH TO 9800' WITH NO PROBLEMS. BREAK CIRCULATION AND DROP BALL. BALL SEATED AFTER 498 STROKES. PRESSURED UP 2100 PSI. P/U AND SHEAR OUT WITH 145 K. RU AND PRESSURE TEST BRIDGE PLUG 1000 PSI FOR 15 MINUTES. RECORDED ON CHART. CIRCULATE BOTTOMSUP AND CLEAN PITS FOR KCL Printed: 11/1912001 10:04:11 AM ,;,,:, .' '" ' ;, " " Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ..Date " , ,,', " , .. 11/13/2001 11/14/2001 -From-To, " 05:30 - 07:00 07:00 - 09:00 09:00 - 10:00 10:00 - 21:00 21 :00 - 22:00 22:00 - 23:00 23:00 - 00:00 00:00 - 08:30 08:30 - 09:30 09:30 -11:00 11 :00 - 12:00 12:00 - 17:00 17:00 - 20:00 20:00 - 22:30 22:30 - 23:30 23:30 - 00:00 {' ( ;BPEXPLORATION :"" Operations Summary 'Report , MPI-12 MPI-12 DRILL +COMPLETE NABORS NABORS 22E Hours Act~vity Code NPT Phase 1.50 CASE 2.00 CASE 1.00 CASE PROD2 PROD2 PROD2 P P P 11.00 CASE P 1.00 CASE P 1.00 BOPSUF P 1.00 CASE P PROD2 PROD2 PROD2 PROD2 8.50 CASE P PROD2 1.00 CASE PROD2 P 1.50 CASE P PROD2 1.00 WHSUR P 5.00 BOPSUF P PROD2 PROD2 3.00 WHSUR P PROD2 2.50 WHSUR P PROD2 1.00 WHSUR P PROD2 0.50 WHSUR P PROD2 Page 25"of25 .. Start: 1017/2001 Rig Release: 11/14/2001 Rig Number: Spud Date: 10/7/2001 End: 11/14/2001 Description of Operations' WATER. CIRCULATE AND DISPLACE WELL WITH 9.2 KCL WATER. CLEAN TROUGHS AND UNDER SHAKER. SERVICE TOP DRIVE. PUMP DRY JOB. POOH LAYING DOWN 3-1/2" DRILL PIPE. SLIP AND CUT 134' DRILL LINE CHANGE TOP RAMS 2-7/8" AND TEST DOOR SEALS. RIG UP, MU BAKER RETRIEVING HEAD AND RIH PICKING UP 2-7/8" TUBING. FINISH RUNNING PLUG RETRIEVING TOOL ON 2-7/8" TUBING. A TOTAL OF 310 JTS WERE RUN. BLOW DOWN HOLE FILL LINE AND STAND PIPE. DRAIN BOP STACK. INSTALL DUMMY ESP AND LAND HANGER. BOTTOM OF TUBING AT 9714'. RILDS. INSTALL TWO CHECK AND TEST 1000 PSI-OK NIPPLE DOWN BOP'S. OPEN DOORS AND REMOVE RAM BODIES. REMOVE DOUBLE STUDDED ADAPTOR AND SET STACK ON BOP STAND. NIPPLE UP ADAPTOR FLANGE AND FMC 2-9/16 5M DOUBLE ACTUATED TREE. TEST TREE 5000 PSI. PULL TWO CHECK AND FREEZE PROTECT 2-7/8" X 7" AND INSIDE TUBING WITH 90 BBLS DIESEL. LET DIESEL EQUALIZE INSIDE 2-7/8" TUBING AND 7" ANNULUS. INSTALL BPV AND RELEASE RIG. Printed: 11/1912001 10:04:11 AM (' ( , " ,.'. " , ',' BPEXPLORATION - . " .. ,,:' Page 1of 1 . . , Operåtions'SummaryReport: Legal Well Name: MPI-12 Common Well Name: MPI-12 Spud Date: 1017/2001 Event Name: WORKOVER Start: 12/6/2001 End: 12/8/2001 Contractor Name: NABORS Rig Release: 12/8/2001 Rig Name: NABORS 4ES Rig Number: Date From- To Hours', Activity Code NPT ' Phase' Description of Operations ' 12/6/2001 10:00 - 11 :30 1.50 MOB P DECOMP SCOPE AND LOWER DERRICK. RDMO. 11 :30 - 15:00 3.50 MOB P DECOMP MOVE FROM MPI-11 TO MPI-12. STANDBY AT MPI-12 FOR WELL HOUSE TO BE SET ON MPI-11. SPOT RIG AT MPI-12. 1S:00 - 17:00 2.00 RIGU P DECOMP RAISE AND SCOPE DERRICK. COMPLETE RIG UP. ACCEPTED RIG AT 17:00 HRS. 17:00 - 18:00 1.00 REST P DECOMP CHECK WHITBG PRESS = O. PU LUBRICATOR AND PULL BPV. INSTALL TWC. CREW CHANGE. 18:00 - 18:30 0.50 REST P DECOMP TEST TWC. 18:30 - 19:30 1.00 REST P DECOMP NIPPLE DOWN PRODUCTION TREE. 19:30 - 21 :00 1.50 REST P DECOMP NIPPLE UP BOPE. 21 :00 - 23:30 2.50 REST P DECOMP PERFORM BOP TEST PER AOGCC AND BP REQUIREMENTS...25/2500 PSI. STATE'S RIGHT TO WITNESS WAIVED BY C. SHEVE 23:30 - 00:00 0.50 REST P DECOMP PU LUBRICATOR AND PULL TWC. 12n/2001 00:00 - 00:30 0.50 REST P DECOMP MU LANDING JT. BOLDS. PULL TBG HANGER TO FLOOR. LD HANGER AND LANDING JT. 00:30 - 02:30 2.00 REST P DECOMP CIRCULATE WELL OVER TO 9.0 LB/GAL BRINE. 02:30 - 03:00 0.50 REST P DECOMP RIH AND TAG RET BRIDGE PLUG AT 9804-FT. EQUALIZE AND RELEASE BP. 03:00 - 04:30 1.50 REST P DECOMP CIRCULATE BTMS UP. MONITOR. WELL DEAD. 04:30 - 06:00 1.50 REST P DECOMP START TOH WITH 2 7/8" TBG AND BP. CREW CHANGE. 06:00 - 09:00 3.00 REST P DECOMP FINISH TOH. LD BP. HALF OF ONE RUBBER ELEMENT MISSING. 09:00 - 15:30 6.50 REST N DPRB DECOMP ORDER OUT REVERSE BASKET. MU REV BASKET AND TIH TO TOP OF BAKER HOOK WALL HANGER AT 9,906-FT. 15:30 -18:00 2.50 REST N DPRB DECOMP START TOH WITH 2 7/8" TBG AND REV BASKET. CREW CHANGE. 18:00 - 20:00 2.00 REST N DPRB DECOMP FINISH TOH WITH TGB AND REV BASKET. LD. RECOVERED RUBBER ELEMENT. 20:00 - 23:30 3.50 REST P DECOMP PU AND SERVICE ESP ASSY 23:30 - 00:00 0.50 REST P DECOMP START TIH W/ESP ASSY AND 2 7/8" TBG. 12/8/2001 00:00 - 03:30 3.50 RUNCO COMP RUN IN HOLE WITH ESP COMPLETION - 03:30 - 06:00 2.50 RUNCO COMP SPLICE ESP CABLE MID-LINE SPLICE. 06:00 - 07:30 1.50 RUNCO COMP CONTINUE TO RIH WITH ESP COMPLETION TO 9656' 07:30 - 10:00 2.50 RUNCO COMP MAKE UP HANGER & INSTALL ESP PENETRATORS & SPLICE CABLE AND LAND SAME. RILDS 10:00 - 11 :30 1.50 BOPSU P COMP NIPPLE DN BOP 11:30 -13:30 2.00 WHSUR P COMP NIPPLE UP TREE & TEST TO 5000 PSI. & PULL TWC AND SET BPV. 13:30 -15:00 1.50 CHEM P COMP FREEZE PROTECT WELL WITH 80-BBL.. DEAD CRUDE IN ANNULUS AND 15-BBL. IN TBG. RIG RELEASED @ 1500 HRS. 12/08/2001 Printed: 12/1012001 11: 18:30 AM (' ( 03-Dec-0 1 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPI-12L 1 MWD do/-/IoY Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 9,894.91 ' MD Window / Kickoff Survey 9,911.00' MD Projected Survey: 12,500.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ~~.¡i\"~ ~'."""(""~. F..'- ,,"¡:' Á~E;;c..-, """)':1 ¡{"It"= ,I~ t\ f! ~~"" ~ ~ '~ l"," ',,~~,.jJ~f ~,;~= ~ '~i!/ """ ~~." ['r:!-' ,,¡ ,¡ 'Î 0 (}1 ---' ~... \.1 I ¡ '- ¡;,!aska Oil ,& Gas Com3. Grjmmïaskm ,t1f:"J!"~"I""¡":;!"!f;:' r',¡!~",i"I,'U!('¡:1:í;'", "-' Milne Point Unit Alaska Drilling & Wells Milne Point MPI, Slot MPI-12 MPI-12L 1 MWD Job No. AKMM11164, Surveyed: 9 November, 2001 SURVEY REPORT 7 February, 2002 Your Ref: API 500292303860 Surface Coordinates: 6009458.18 N, 551375.14 E (70026' 11.7316" N, 149034' 52.0644" W) Kelly Bushing: 63.40ft above Mean Sea Level J?~C~/V~D f:£e 0 4á.t.~1'):. ? 200? ~Vf/'~ "- A,,¿OtJs. ~ . ~ ..,,9'!le -"'IlIISs¡on .",,-- spel'l"J-SUI! DRILLING SERVICES " . A Halliburton Company Survey Ref: svy10029 Milne Point Unit Measured Depth (ft) v- 9894.91 9911.00 9916.00 9953.84 9998.26 10048.45 10092.76 10141.74 10186.37 10234.00 1 0277.1 0 10323.76 10371.28 10416.93 10464.94 "-' 10510.81 1 0555.83 1 0603.72 1 0649.60 1 0695.18 1 0738.53 1 0788.65 1 0833.82 1 0880.31 1 0927.38 1 0972.03 11017.80 11066.35 11108.74 11161.10 Incl. 78.360 79.760 80.200 83.520 87.910 87.720 88.030 88.460 87.600 87.410 87.970 90.310 90.550 90.310 90.370 89.510 89.450 89.080 89.140 91.170 90.860 89.750 90.000 90.180 90.310 90.250 89.450 89.080 89.450 90.620 7 February, 2002 ~ 9:51 Azim. 281.850 277.590 277.290 265.410 281.000 275.190 279.300 278.790 272.760 270.010 269.040 268.130 271.600 267.630 269.540 268.400 272.710 268.320 269.160 273.340 271 .560 271.510 272.130 270.740 273.350 274.800 271 .790 274.750 271 .110 271 .960 Sub-Sea Depth (ft) 3583.17 3586.22 3587.09 3592.47 3595.81 3597.72 3599.37 3600.87 3602.40 3604.48 3606.21 3606.91 3606.56 3606.21 3605.93 3605.98 3606.39 3607.00 3607.71 3607.59 3606.82 3606.56 3606.65 3606.58 3606.38 3606.16 3606.28 3606.90 3607.45 3607.42 Sperry-Sun Drilling Services Survey Report for MPI-12L 1 MWD Your Ref: API 500292303860 Job No. AKMM11164, Surveyed: 9 November, 2001 Vertical Depth (ft) 3646.57 3649.62 3650.49 3655.87 3659.21 3661.12 3662.77 3664.27 3665.80 3667.88 3669.61 3670.31 3669.96 3669.61 3669.33 3669.38 3669.79 3670.40 3671.11 3670.99 3670.22 3669.96 3670.05 3669.98 3669.78 3669.56 3669.68 3670.30 3670.85 3670.82 Local Coordinates Northings Eastings (ft) (ft) 1508.36 N 1511.02N 1511.66N 1512.53 N 1515.01 N 1522.07 N 1527.65 N 1535.35 N 1539.84 N 1540.99 N 1540.63 N 1539.48 N 1539.37 N 1539.06 N 1537.87 N 1537.05 N 1537.48 N 1537.92 N 1536.91 N 1537.90 N 1539.75 N 1541.10 N 1542.53 N 1543.69 N 1545.37 N 1548.55 N 1551 .18 N 1553.95 N 1556.11 N 1557.51 N 7768.82 W 7784.39 W 7789.27 W 7826.65 W 7870.72 W 7920.35 W 7964.27 W 8012.62 W 8056.98 W 8104.54 W 8147.60 W 8194.24 W 8241.75 W 8287.39 W 8335.38 W 8381.24 W 8426.25 W 8474.12 W 8519.99W 8565.54 W 8608.84 W 8658.94 W 8704.09 W 8750.57 W 8797.60 W 8842.14 W 8887.82 W 8936.29 W 8978.61 W 9030.95 W Global Coordinates Northings Eastings (ft) (ft) 6010912.99 N 6010915.54 N 6010916.15 N 6010916.75 N 6010918.94 N 6010925.65 N 6010930.93 N 6010938.30 N 6010942.48 N 6010943.30 N 6010942.65 N 6010941.17 N 6010940.73 N 6010940.11 N 6010938.60 N 6010937.46 N 6010937.58 N 6010937.68 N 6010936.36 N 6010937.04 N 6010938.59 N 6010939.59 N 6010940.71 N 6010941 .56 N 6010942.91 N 6010945.78 N 6010948.10 N 6010950.53 N 6010952.41 N 6010953.45 N 543596.11 E 543580.53 E 543575.64 E 543538.26 E 543494.17 E 543444.49 E 543400.53 E 543352.13 E 543307.75 E 543260.18 E 543217.12 E 543170.49 E 543122.98 E 543077.34 E 543029.36 E 542983.51 E 542938.50 E 542890.62 E 542844.77 E 542799.21 E 542755.89 E 542705.79 E 542660.63 E 542614.15 E 542567.10 E 542522.55 E 542476.84 E 542428.36 E 542386.02 E 542333.68 E Dogleg Rate (0/100ft) 27.412 10.600 32.288 36.358 11.574 9.296 1.362 13.640 5.782 2.597 5.381 7.319 8.712 3.980 3.113 9.574 9.199 1.835 10.194 4.167 2.217 1 .480 3.015 5.552 3.250 6.805 6.144 8.630 2.762 . Alaska Drilling & Wells Milne Point MPI Vertical Section 7903.03 7918.82 7923.74 7960.87 8004.87 8055.00 8099.27 8148.21 8192.76 8240.03 8282.62 8328.65 8375.68 8420.84 8468.20 8513.50 8558.13 8605.60 8650.88 8696.13 8739.27 8789.07 8833.98 8880.16 8926.98 8971.52 9017.13 9065.51 9107.72 9159.75 Comment Tie-On Point Window Point Page 2 of 4 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for MPI-12L 1 MWD Your Ref: API 500292303860 Job No. AKMM11164, Surveyed: 9 November, 2001 . Alaska Drilling & Wells Milne Point Unit Milne Point MPI Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) e/1 OOft) 11205.57 89.200 271 .840 3607.49 3670.89 1558.99 N 9075.39 W 6010954.62 N 542289.22 E 3.205 9203.97 >~ 11252.25 90.000 274.730 3607.81 3671.21 1561.66 N 9121.99 W 6010956.97 N 542242.61 E 6.424 9250.49 11298.79 92.710 274.540 3606.71 3670.11 1565.42 N 9168.36 W 6010960.41 N 542196.21 E 5.837 9296.93 11344.02 89.880 274.790 3605.69 3669.09 1569.10 N 9213.43 W 6010963.78 N 542151.12 E 6.281 9342.07 11387.37 89.940 280.970 3605.76 3669.16 1575.04 N 9256.35 W 6010969.42 N 542108.16 E 14.257 9385.40 11436.29 90.000 276.800 3605.78 3669.18 1582.59 N 9304.67 W 6010976.64 N 542059.79 E 8.525 9434.30 11482.49 89.630 277.360 3605.93 3669.33 1588.29 N 9350.51 W 6010982.02 N 542013.91 E 1.453 9480.49 11531 .12 90.000 281.980 3606.09 3669.49 1596.46 N 9398.44 W 6010989.86 N 541965.93 E 9.531 9529.09 11574.67 89.820 277.560 3606.16 3669.56 1603.84 N 9441.35 W 6010996.95 N 541922.97 E 10.158 9572.61 11621.26 91 .350 283.880 3605.68 3669.08 1612.50 N 9487.10 W 6011005.29 N 541877.16 E 13.956 9619.12 11663.88 93.200 280.580 3603.99 3667.39 1621.52 N 9528.71 W 6011014.03 N 541835.49 E 8.871 9661.58 11718.12 92.770 281 .330 3601.17 3664.57 1631.82 N 9581.89 W 6011023.95 N 541782.24 E 1.592 9715.67 11761.59 92.770 280.140 3599.06 3662.46 1639.91 N 9624.55 W 6011031.75 N 541739.52 E 2.734 9759.04 11807.58 92.400 281 .360 3596.99 3660.39 1648.48 N 9669.68 W 6011040.01 N 541694.33 E 2.769 9804.93 11852.11 91.840 277.830 3595.34 3658.74 1655.89 N 9713.55 W 6011047.12N 541650.41 E 8.021 9849.40 11902.54 93.940 276.950 3592.80 3656.20 1662.37 N 9763.50 W 6011053.25 N 541600.42 E 4.514 9899.76 11946.61 92.650 272.840 3590.27 3653.67 1666.12 N 9807.32 W 6011056.70 N 541556.57 E 9.760 9943.68 11999.93 90.740 275.760 3588.69 3652.09 1670.12 N 9860.46 W 6011060.33 N 541503.41 E 6.542 9996.86 "-- 12044.79 90.370 280.100 3588.25 3651.65 1676.31 N 9904.88 W 6011066.21 N 541458.95 E 9.709 10041.71 12092.82 91 .600 276.050 3587.43 3650.83 1683.05 N 9952.42 W 6011072.63 N 541411.37 E 8.811 10089.72 12140.48 91 .350 275.750 3586.20 3649.60 1687.95 N 9999.81 W 6011077.20 N 541363.94 E 0.819 10137.33 12186.96 91.840 279.210 3584.91 3648.31 1693.99 N 10045.87 W 6011082.93 N 541317.84 E 7.515 10183.79 12238.63 92.470 273.120 3582.96 3646.36 1699.54 N 10097.18 W 6011088.12 N 541266.49 E 11.841 10235.37 12282.53 92.460 277.500 3581.07 3644.47 1703.60 N 10140.84 W 6011091.88 N 541222.81 E 9.968 10279.17 12334.30 93.510 272.650 3578.38 3641.78 1708.17 N 10192.32 W 6011096.10 N 541171.30 E 9.573 10330.79 12377.29 93.640 272.560 3575.69 3639.09 1710.12 N 10235.18 W 6011097.75 N 541128.42 E 0.368 10373.51 12432.64 93.390 277.490 3572.30 3635.70 1714.96 N 10290.20 W 6011102.21 N 541073.37 E 8.902 10428.66 12500.00 93.390 277.490 3568.32 3631.72 1723.72 N 10356.87 W 6011110.52 N 541006.65 E 0.000 10495.90 Projected Survey 7 February, 2002 - 9:51 Page 3 of 4 Dri/lQuest 2.00.08.005 .. Sperry-Sun Drilling Services Survey Report for MPI-12L 1 MWD Your Ref: API 500292303860 Job No. AKMM11164, Surveyed: 9 November, 2001 . Milne Point Unit Alaska Drilling & Wells Milne Point MPI All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. c Magnetic Declination at Surface is 26.093° (09-Nov-01) "",-", The Dogleg Severity is in Degrees per 1 00 feet (US). Vertical Section is from Well and calculated along an Azimuth of 277.985° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12500.00ft., The Bottom Hole Displacement is 10499.33ft., in the Direction of 279.449° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 9894.91 9911.00 12500.00 3646.57 3649.62 3631.72 1508.36 N 1511.02N 1723.72 N 7768.82 W 7784.39 W 10356.87 W Tie-On Point Window Point Projected Survey '- Survey tool program for MPI-12L 1 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 0.00 12500.00 3631.72 MWD Magnetic (MPI-12PB1 MWD) 7 February, 2002 - 9:51 Page 4 of 4 DrillQuest 2.00.08.005 If " 1 t AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Definative Surveys Re: Distribution of Survey Data for Well MPI-12L 1 cYDJ- llo~ Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 9,894.91 ' MD Window / Kickoff Survey 9,911.00' MD Projected Survey: 12,500.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 03-Dec-0 1 £f,i"""" C'\' E"""'" ,.." " ' , f ,;¡ ,). --..;.. -, ~ C:.,~1~J'lEt) [I f--:-(\ -1 -¡ t') 0 01 ""',...v I ¡ Li !;¡~::1¡;¡~~ Oil ç~ G'>':!", C. C " """"'~ ,,¡ t:G. (~~ -on:>, ,.omrmooiori An(;~lm~ge '::)- ~ 1 ....... 0 ~ DEFINITIVE 0,-, Milne Point Unit Alaska Drilling & Wells Milne Point MPI, Slot MPI-12 MPI-12L 1 Job No. AKZZ11164, Surveyed: 9 November, 2001 SURVEY REPORT 30 November, 2001 Your Ref: API 500292303860 Surface Coordinates: 6009458.18 N, 551375.14 E (70026' 11.7316" N, 149034' 52.0644" W) Kelly Bushing: 63.40ft above Mean Sea Level ~~ 5pe...,....y-sun. DRILLING seRVices A Halliburton Company Survey Ref: svy10026 Sperry-Sun Drilling Services Survey Report for MPI-12L1 Your Ref: API 500292303860 Job No. AKZZ11164. Surveyed: 9 November. 2001 . Alaska Drilling & Wells Milne Point Unit Milne Point MPI Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth - Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 9894.91 78.360 278.590 3582.71 3646.11 1098.10 N 7843.18 W 6010502.23 N 543524.58 E 7918.61 Tie-On Point 9911.00 79.760 277.590 3585.76 3649.16 1100.32 N 7858.82 W 6010504.34 N 543508.93 E 10.627 7934.41 Window Point 9916.00 80.200 277.290 3586.63 3650.03 1100.96 N 7863.70 W 6010504.95 N 543504.04 E 10.600 7939,33 'c~~ 9953.84 83,520 276.410 3591.99 3655.39 1105.43 N 7900.89 W 6010509.16 N 543466.83 E 9.071 7976.78 9998.26 87.910 275.390 3595.31 3658.71 1109.98 N 7944.94 W 6010513.40 N 543422.75 E 10.145 8021.06 10048.45 87.720 274.240 3597.22 3660.62 1114.19 N 7994.91 W 6010517.27 N 543372.74 E 2.321 8071.17 10092.76 88.030 273.230 3598.86 3662.26 1117 .07 N 8039.10 W 6010519.85 N 543328.54 E 2.383 8115.38 10141.74 88.460 272.110 3600.36 3663.76 1119.35 N 8088.00 W 6010521.79 N 543279.62 E 2.448 8164.19 10186.37 87.600 271.090 3601.90 3665.30 1120.60 N 8132.59 W 6010522.73 N 543235.03 E 2.988 8208.60 10234.00 87.410 270.010 3603.97 3667.37 1121.06N 8180.17W 6010522.86 N 543187.44 E 2.300 8255.88 10277.10 87.970 269.070 3605.71 3669.11 1120.71 N 8223.23 W 6010522.22 N 543144.38 E 2.537 8298.57 10323.76 90.310 269.000 3606.41 3669.81 1119.92 N 8269.87 W 6010521.11 N 543097.75 E 5.017 8344.77 10371.28 90.550 269.500 3606,05 3669.45 1119.30 N 8317.39 W 6010520.16 N 543050.24 E 1.167 8391.85 10416.93 90.310 268.140 3605.71 3669.11 1118.36 N 8363.03 W 6010518.91 N 543004.61 E 3.025 8437.03 10464.94 90.370 270.820 3605.43 3668.83 1117.93 N 8411.03 W 6010518.14 N 542956.61 E 5.583 8484.62 10510.81 89.510 270.540 3605.47 3668.87 1118.47 N 8456.90 W 6010518.37 N 542910.74 E 1.972 8530.21 10555.83 89.450 271.120 3605.88 3669.28 1119.12 N 8501.91 W 6010518.71 N 542865.72 E 1.295 8574.96 10603.72 89.080 269.190 3606.50 3669.90 1119.25 N 8549.79 W 6010518.51 N 542817.84 E 4.103 8622.50 10649.60 89.140 269.930 3607.21 3670.61 1118.90 N 8595.67 W 6010517.84 N 542771.97 E 1.618 8667.99 10695.18 91.170 271.180 3607.09 3670.49 1119.34 N 8641.24 W 6010517.97 N 542726.39 E 5.230 8713.27 --- 10738.53 90.860 271.350 3606.32 3669.72 1120.30 N 8684.57 W 6010518.63 N 542683.06 E 0.816 8756.40 10788.65 89.750 273.600 3606.05 3669.45 1122.46 N 8734.64 W 6010520.45 N 542632.97 E 5.006 8806.35 10833.82 90.000 273.320 3606.15 3669.55 1125.19 N 8779.73 W 6010522.86 N 542587.87 E 0.831 8851.44 10880.31 90,180 273.130 3606.08 3669.48 1127.80 N 8826.15 W 6010525.16 N 542541.44 E 0.563 8897.82 10927.38 90,310 273.690 3605.88 3669.28 1130.60 N 8873.13 W 6010527.63 N 542494.43 E 1.221 8944.80 10972.03 90.250 273.740 3605.66 3669.06 1133.50 N 8917.69 W 6010530.22 N 542449.86 E 0.175 8989.37 11017.80 89.450 273.870 3605.78 3669.18 1136.53 N 8963.36 W 6010532.94 N 542404.17 E 1,771 9035.07 11066.35 89.080 273.830 3606.40 3669.80 1139.79 N 9011.79W 6010535.87 N 542355.71 E 0,767 9083.54 11108.74 89.450 273.990 3606.94 3670.34 1142.68 N 9054.08 W 6010538.47 N 542313.40 E 0,951 9125.86 11161.10 90.620 273.800 3606.91 3670.31 1146.24 N 9106.32 W 6010541.66 N 542261.14 E 2.264 9178,15 -p'-- _he_, ----. - -- - ,.,---.. ---, -- ----- 30 November, 2001 - 17:47 Page 2 of 4 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for MPI-12L1 Your Ref: API 500292303860 Job No. AKZZ11164, Surveyed: 9 November, 2001 . Alaska Drilling & Wells Milne Point Unit Milne Point MPI Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth - Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) C)/1 OOft) 11205.57 89.200 273.410 3606.98 3670.38 1149.04 N 9150.70 W 6010544.15 N 542216.74 E 3.311 9222.53 11252.25 90.000 274.150 3607.31 3670.71 1152.11 N 9197.28 W 6010546.91 N 542170.15 E 2.335 9269.14 "'c~ 11298.79 92.710 276.420 3606.21 3669.61 1156.40 N 9243.60 W 6010550.88 N 542123.80 E 7.595 9315.64 11344.02 89.880 278.280 3605.18 3668.58 1162.18 N 9288.44 W 6010556.35 N 542078.92 E 7.487 9360.85 11387.37 89.940 279.220 3605.25 3668.65 1168.78 N 9331.28 W 6010562.65 N 542036.03 E 2.173 9404.18 11436.29 90.000 278.670 3605.28 3668.68 1176.38 N 9379.61 W 6010569.92 N 541987.65 E 1.131 9453.07 11482.49 89,630 278.530 3605.43 3668.83 1183.29 N 9425.29 W 6010576.52 N 541941.93 E 0.856 9499.25 11531.12 90.000 278,940 3605.58 3668.98 1190.68 N 9473.35 W 6010583.57 N 541893.81 E 1,136 9547.86 11574.67 89,820 279.020 3605.65 3669.05 1197.48 N 9516.37 W 6010590.07 N 541850.75 E 0.452 9591.38 11621.26 91,350 279,470 3605.18 3668.58 1204.96 N 9562.35 W 6010597.24 N 541804.72 E 3.423 9637.94 11663.88 93.200 279.040 3603.49 3666.89 1211.81 N 9604.38 W 6010603.80 N 541762.64 E 4.456 9680.49 11718.12 92.770 278.640 3600.66 3664.06 1220.13 N 9657.90 W 6010611.75 N 541709.06 E 1.082 9734.63 11761.59 92,770 278.320 3598.56 3661.96 1226.54 N 9700.85 W 6010617.86 N 541666.07 E 0.735 9778.03 11807.58 92.400 278.340 3S96.49 3659.89 1233.19 N 9746.31 W 6010624.20 N 541620.57 E 0.806 9823.96 11852.11 91.840 277.610 3594.84 3658.24 1239.37 N 9790.37 W 6010630.07 N 541576.46 E 2.065 9868.46 11902.54 93.940 275.580 3592.30 3655.70 1245.15 N 9840.40 W 6010635.51 N 541526.39 E 5.788 9918.82 11946.61 92.650 276.200 3589.76 3653.16 1249.66 N 9884.16W 6010639.73 N 541482.60 E 3.247 9962.80 11999.93 90.740 276.330 3588.19 3651.59 1255.48 N 9937.14 W 6010645.18 N 541429.59 E 3.590 10016.09 12044.79 90,370 276,530 3587.75 3651.15 1260.50 N 9981.72 W 6010649.89 N 541384.98 E 0.938 10060.95 12092.82 91.600 275.270 3586.93 3650.33 1265.44 N 10029.48 W 6010654.50 N 541337.18 E 3.666 10108.96 -,"- 12140.48 91.350 275.920 3585.70 3649.10 1270.09 N 10076.90 W 6010658.82 N 541289.73 E 1.461 10156.59 12186.96 91.840 275.810 3584.41 3647.81 1274.83 N 10123.12 W 6010663.25 N 541243.48 E 1.080 10203.04 12238.63 92.4 70 274.990 3582.46 3645.86 1279.69 N 10174.52 W 6010667.75 N 541192.04 E 2.000 10254,65 12282.53 92.460 275.310 3580.57 3643.97 1283.63 N 10218.20 W 6010671.39 N 541148.34 E 0.729 10298.49 12334.30 93.510 274.930 3577.88 3641.28 1288.24 N 10269.70 W 6010675.65 N 541096.81 E 2.157 10350.16 12377.29 93.640 274.900 3575.20 3638.60 1291.92 N 10312.45 W 6010679.03 N 541054.04 E 0.310 10393.04 12432.64 93.390 275.280 3571.80 3635.20 1296.82 N 10367.47 W 6010683.55 N 540998.98 E 0.821 10448.25 12500.00 93.390 275.280 3567.82 3631.22 1303.01 N 10434.43 W 6010689.28 N 540931.98E 0.000 10515.46 Projected Survey "'m-_u~- _-----0- -_u_---- 30 November, 2001 - 17:47 Page 3 of 4 DrillQuest 2.00.08.005 Milne Point Unit Sperry-Sun Drilling Services Survey Report for MPI.12L 1 Your Ref: API 500292303860 Job No. AKZZ11164, Surveyed: 9 November, 2001 All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.093° (09-Nov-01) '---.,¿. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 277.030° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12500.00ft., The Bottom Hole Displacement is 10515.47ft., in the Direction of 277.118° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 9894.91 9911.00 12500.00 3646.11 3649.16 3631.22 1098.10 N 1100.32 N 1303.01 N '-' --- Survey tool program for MPI-12L 1 From Measured Vertical Depth Depth (ft) (ft) 0.00 0.00 -_..,--- 30 November, 2001 ~ 17:47 To Measured Vertical Depth Depth (ft) (ft) 12500.00 3631.22 -'-- 7843.18 W 7858.82 W 10434.43 W Tie-On Point Window Point Projected Survey Survey Tool Description AK-6 BP JFR-AK (MPI-12PB1) Page 4 of 4 . Alaska Drilling & Wells Milne Point MPI - -----. -, DriflQuest 2.00.08.005 ( ~V~VŒ ffi)~ ~~~~~~ (" ALAS IiA. 0 IL AND GAS CONSERVATI ON COMMISSION TONY KNOWLES, GOVERNOR 333 W. ¡TH AVENUE. SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Steve Shultz Senior Drilling Engineer BP Exploration (Alaska) Inc. , PO Box 196612 Anchorage AK 99519-6612 Re: Milne Point Unit MPI-12L1 BP Exploration (Alaska) Inc. Permit No: 201-164 Sur Loc: 2345' NSL, 3996' WEL, SEC. 33, T13N, R10E, UM Btmho1e Loc. 3914' NSL, 4719' WEL, SEC. 31, T13N, R10E, UM Dear Mr. Shultz: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The permit is for a new wellbore segment of existing well MPI-12, Permit No 201-164, API 50-029- 23038. Production should continue to be reported as a function of the original API number stated above. Annular disposal has not been requested as part of the Permit to Drill application for Milne Point Unit 1v1PI -12L 1. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, CJA Out vÁ ' ~ camm~chsli Taylor ( Chair , BY ORDER OF THE COMlVlISSION DATED thisJ21b..day of October, 2001 jjc/Enclosures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA l JlL AND GAS CONSERVATION COMì"..dSION PERMIT TO DRILL 20 AAC 25.005 ht @/Yjy\ -,//e-) ALAS~' 1 a. Type of work IBI Drill 0 Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2345' NSL, 3996' WEL, SEC. 33, T13N, R10E, UM At top of productive interval 3442' NSL, 1357' WEL, SEC. 31, T13N, R10E, UM At total depth 3914' NSL, 4719' WEL, SEC. 31, T13N, R10E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL 025519,543' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 9820' MD Maximum Hole Angle 18. casi~P7~rogram Specifications Hole C~~inn Weinht Gr~de CotJnlinn Lennth 6-1/8" 4-1/2" 12.6# L-80 IBT 3552' 1 b. Type of well 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 13378 feet 3721 feet feet feet Casing Structural Conductor Surface Intermediate Production Liner Length Size 78' 20" 10381' 3117' 9-7/8" 4-1/2" Perforation depth: measured true vertical 0 Exploratory 0 Stratigraphic Test IBI Development Oil 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (OF or KB) 10. Field and Pool Planned KBE = 64.7' Milne Point Unit / Schrader 6. Property Designation Bluff ADL 025517 7. Unit or Property Name Milne Point Unit 8. Well Number MPI-12L 1 9. Approximate spud date 09/12/01 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 13372' MD / 3655' TVD 17. Anticipated pressure {see 20 MC 25.035 (e) (2)} 0 93 Maximum surface 1249 psig, At total depth (TVD) 3731' / 1679 psig Setting Depth Tlln - MD TVD MD 9820' 3677' 13372' 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 l ofe- . TVD (include staae data) 3655' Uncemented Slotted Liner - - "'" - ~ 11. I po- ........ ~L L., t:. I V r:.: LJ JUL 3 1 ZO01 Plugs (measured) Junk (measured) Alaska Oil & Gas Cons. Commission Anchorage Cemented MD TVD 260 sx Arctic Set (Approx.) 108' 108' 916 sx PF, 708 sx Class 'G' Uncemented Slotted Liner 10411' 13378' 3778' 3721' 181 Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch 181 Drilling Program 181 Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Jim Rose, 564-4787 Prepared By Name/Number: Sondra Stewman, 564-4750 21. I hereby certify that the fo(~.~~-g is tr ~ .Ánd ljOJ{ect to the be~t of my ~nowl~~ge . ~ j , Signed Steve Shultz /I !.I Ll,t; , V1 ~U \ Title Semor Drilling Engineer Date 7 / ð / / ¿J I ,::,:<,,:;::'i:,:i::::!,,:/::,,::":;<'>':"'¡::' ;:::'!:¡;;':::::;;::;:";""':::'::,;'::)S+1:::'/:!:Cq~hli$.ic[)þ;,Ø:.,::Ø~IÝ!'i:;::!.:;,i:¡¡:'::/i':ii':::;::c::':;:¡¡:::;:¡',:::>ii:,;;;:¡;;!/!:"':r.':', '::!1';,~:,:¡,':: ;;:';':,';",:;, Permit Numbe . /' / API Number Appro, aill Date ) See cover letter 2.0/ - "7 b"'7' 50- 0 ¿ 9- 230:5 <¡ - 6" 0 ,rt) 1;)-1'-) for other reQuirements Conditions of Approval: Samples Required 0 Yes B No Mud Log Required' 0 Yes .8 No Hydrogen Sulfide Measures 0 Yes 181 No Directional Survey Required 181 Yes 0 No Required WorkinQ..Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K ~3.5K psi ~T~ ~p'al Signed By Cammy OecMI~1 I r\ ¡ t: I II ~ by order of I /ì'\ I "'.I () \ ADDrOved Bv r r~.¿ i ! --II i í\! l\ , Commissioner the commission Date 'U I d-. Form 10-401 Rev. 12-01-85 ....., \. '--' U f \j l 1 L. Subrhit In 1riplicate 20. Attachments ('" t MPI-12L 1 Drillin9 Permit 1. Well Plan Summar'l Iwell Name: I MPI-12L 1 lliPe of Well (producer or injector): I Schrader Bluff Multilateral producer Surface Location: 23451 FSL,39961 FEL, SEC. 33, T13N, R10E X = 551375.01 Y = 6009458.19 1-12 Target DB: 35001 FSL, (1778' FNL), 17461 FEL (3517' FWL), SEC. 31, T13N, R10E X =543053.79 Y = 6010561.52 = 3710.54TVDss 1-12 Target (Bottom Hole 39261 FSL, (1353' FNL), 4718' FEL (543' FWL), SEC. 31, T13N, R10E Location DB): X =540077.76 Y =6010970.22 2 = 3657' TVDss 1-12~~arget OA: 3442' FSL, (1837' FNL), 1357' FEL (3907' FWL), SEC. 31, T13N, R10E X=543444.04, Y=6010505.30 1-12~Target (Bottom 3914' FSL (1365' FNL), 4719' FEL (543' FWL), SEC. 31, T13N, R10E Hole Location OA): X=540077.76, Y=6010958.23 ~ Nabors 22E I KOP: KOP: L 1 OA 300 9820' KBE: 64.7 I Estimated Start Date: l.Qperatin9 days to complete: 138.4 I MDrkb MDrkbL 1 13,378' 13,372' ~t12,2001 TVDrkb (TD) TVDrkbL 1 (TD) 3,721' 3,655' Max. Inc. Max. Inc.L 1 91.979° 92.875° I Well Desi9.!!Jconventional, slim hole, etc.),J Multilateral Producer ~e: I Drill and Complete a Multilateral Producer in the Schrader Bluff OA and OB sands. Version #1,6/20/2001 {' t MPI-12L 1 Drilline Permit 2. Current Well Information 2.1. General Well Name: MPI-12 API Number: Well Type: Current Status: BHP: BHT: MPI-12L 1 Development - Schrader Bluff Multilateral Producer - lower leg Conductor Set 1679 psi @ 3731' TVDss Base of Schrader Bluff OB Sands. 80°F @ 4020' TVDss Estimated (SOR) 2.2. Current Mechanical Condition MPI-12: Nabors 22E: Conductor: Cellar Box above MSL = 34.7 KB from Ground Level = 30' 20",92 I bItt , H-40 Welded set at 78' MD 2.3. Target Estimates Estimated Reserves: 1.6MMBBL Expected Initial Rate: 3000 BOPD Expected 6 month avg: 1476 BOPD 2 (' (' MPI-12L 1 Drillin9 Permit 3. Drillinq Hazards and Contin~encies Drill 01 02 03 04 05 3.1. Well Control MANDATORY WELL CONTROL DRILLS: T e Fre uenc Comments Tri in er week, er crew Conducted onl inside casin . Orillin er week, er crew Either in cased or 0 en hole. 00 NOT shut-in well in 0 en hole. Oiverter N/A N/A Accumulator Prior to s ud or RWO A rox. eve 30 da s, thereafter at convenient times. Well Kill Prior to drill out, Prior to drill out the intermediate and production strings. Never er crew car out this drill when 0 en hole sections are ex osed. 3.2. Kick Tolerance 3.2.1.The 7" casing will be cemented to surface. The top of the 15.8 Ib/gal tail cement slurry is planned to be 1000' MD above the NA Sands - 8400' MO 3.2.2.The Kick Tolerance for the production casing based on the 8.65 expected pore pressure is infinite. 3.3. Lost Circulation 3.3.1.Lost circulation has not been encountered while drilling this interval on previous I-Pad wells. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. 3.4. Unexpected Pressures 3.4.1.lt is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be 1679 psi (8.65 Ib/gal). In this well, the Schrader Bluff formation will be drilled with 9.2-ppg mud. 3.5. Stuck Pipe 3.5.1.Good drilling practices to avoid differential sticking are required. Minimum mud weights and proper mud properties as outlined in the Baroid mud program must be closely followed. 3.5.2.Stuck Pipe: Go immediately to SURE manual, determine stuck pipe mechanism, follow recommendations in the SURE manual. DO NOT JAR UP if packed-off! 3.6. Pad Data Sheet 3.6.1. Please Read the I-Pad Data Sheet thoroughly. 3.7. Hydrocarbons 3.7.1.Hydrocarbons will be encountered in the Ugnu and Schrader Bluff intervals. 3.8. Faults 3.8.1.lt appears likely that the wellbore for both of the laterals will intersect a series of small faults at -12500' MO. The first fault encountered is downthrown to the west, by -40'. 300' westward of this fault is a down to the east fault with similar throw to the first fault. We will probably want to be 3 ( { MPI-12L 1 Drilling Permit deeper in the OA and OB prior to hitting the first fault and then higher in section for the second fault. 3.9. Hydrogen Sulfide 3.9.1.MPI Pad is not designated as an H2S Pad. Below is a summary of the most recent H2S readings: Welll- Well Type H2S Status Date taken 1 Long Term Shut In Feb 2000 2 SBF Prod <2.00 Apr2000 3 SBF Prod <2.00 Feb 2000 4 SBF Prod <2.00 Feb 2000 5i SBF Inj Injector Apr2000 6 SBF Prod <2.00 Feb 2000 7 SBF Prod <2.00 Feb 2000 8 SBF Prod <2.00 Feb 2000 4 {' MPI-12L 1 Drilline Permit 4. Drillin{:l Proqram Overview 4.1. Surface and Anti-Collision Issues Surface Shut-in Wells: 1-13i will be shut in prior to drilling 1-12 Close Approach Wells: Well Name Current Production Precautions Status Priority N/A N/A N/A N/A 4.2. Well Control Max Ex BOPE Ratin 135/8" 5M -s5CÔ ~\4R~ Planned BOPE Test Pres. \ Rams & Valves:~si/250 psi Annular: 2500 si 1250 si Ex ected BHP 1679 psi @ 3731' TVDss estimated 4.3. Mud Program 9-7/8" Surface Hole Mud Pro )erties: Spud - LSND Freshwater Mud Density (ppq) Funnel visc YP HTHP pH API Filtrate LG Solids 8.6- 9.2 50 -150 15 - 40 N/A 9.0 - 9.5 <6 < 6.5 6-1/8" Production Hole Mud Properties: CAleB KCI-CaC03 Baradrill N Mud Density (ppg) Funnel visc YP HTHP pH API Filtrate LG Solids 9.2 40 - 55 22 - 27 <10 8.0-8.5 4-6 <12 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. 4.4. Formation Markers Formation Tops ft MD ft TVDss Pore (psi) EMW" -" Base Permafrost 1775 Top Uqnu 3186 1434 8.65 Top Uqnu M 3432 1544 8.65 Schrader -NA 3487 1569 8.65 Schrader -NB 3515 1582 8.65 Schrader -NC 3546 1596 8.65 Schrader -NE 3565 1604 8.65 Schrader -NF 3611 1625 8.65 Schrader -OA 3647 1641 8.65 TSBC - Base OA 3681 1656 8.65 TSBB-OB 3709 1669 8.65 SBA5 - Base OB 3731 1679 8.65 TD-OA 3591 TD-OB 3657 5 ( ,í: MPI-12L 1 Drillin9 Permit 4.5. Casingrrubing Program Hole Size Csgl WtlFt Grade Conn Length Top Bottom Tbg O.D. M D 1 TVDrkb MD 1 TVDrkb 30" 20" 92# H-40 Welded 78' 30' I 30' 108' /108' 9-7/8" 7" 26# L-80 H521 1 0381 ' 30' I 30' 10411' / 3778' OA 6-1/8" 4-1/2" Slotted 12.6# L-80 IBT +1- 3552' 9820' I 3677' 13372' / 3655' OB 6-1/8" 4-1/2" Slotted 12.6# L-80 IBT +1- 3117' 10261' I 3778' 13378' / 3721' Tubing 3-1/2" 9.3# L-80 EUE-Mod +1- 9670' 30' I 30' 9700' / 3632' 4.6. Cement Calculations Casin Size 7" 26 Ib/tt L-80 H521 Basis 250% excess over au e hole in permafrost interval, 50% excess over gauge hole below permafrost A TAM Port Collar will be laced at 1000' MD as a cantin enc for cement not dis lacin to surface in one sta e Total Cement Volume: Wash 50 bbl Freshwater S acer 75 bbl of Viscosified S acer wei hted to 10.20 Lead 677 bbl 916 sx 10.7 Ibl al Permafrost cement Tail 145 bbl 708 sx 15.81bl al Prem Class G + adds ",","',',", ,.. ""','," ,"""",'",""'""""""',,,..,....,, """",..,..""", .."", """ """"",,"',.." """"""'",, """"" ","",," ,,>",,""""" >",,' """ ,""'," .., ,",' '..' Tem BHST == 80° F from SOR, BHCT 85° F 4.7. Survey and Logging Program 9-7/8" Hole Section: Open Hole: MWD 1 DIR 1 GR 1 Res 1 PWD 6-1/8" Hole Section: Open Hole: MWD 1 DIR{IFR) 1 ABGR 1 Res 1 PWD 1 ABI Res placed as close to bit as possible. Cased Hole: None 6 Ai '~, ( MPI-12L 1 Drillin!¡l Permit 5. MPI-12L 1 Operations Summar'l 5.1. Pre-Rig Operations 1. 2. Grade and level pad. Install 20" Conductor. 5.2. Procedure MIRU, NU riser on 20" conductor, PU 5" drill pipe Drill 9-7/8" surface hole as per directional plan. Maximum tangent angle 90° Condition mud with lubes and spot casing running lube pill prior to 711 casing run. POOH laying down DP 4. Run and cement 711 casing from TD to surface. TAM Port Collar @ 1000' as contingency should cement not reach the surface. 5. ND riser. 6. Install FMC 1111 5m horizontal wellhead 7. N/U and test 13 %11 5m BOP 8. Test casing to 3,500 psig. 9. Drill out float eqpt and 30' of formation. 10. Perform FIT to 11.5 ppg equiv. 11. Drill 6-1/8" OB horizontal production hole as per directional plan. -1/2" slot cl~Q!L150:iQside 7" casi 13. ake up Baker Window Master milling assembly with bottom trip anchor and MWD. 14. RIH. Orient and set whipstock to place window at top of the OA interval. 15. Shear off and mill window thru 7" casing. 16. RIH. Displace hole to clean Bara Drill mud. 17. Drill 30' of new formation 18. Perform FIT to 11.5 ppg equiv. 19. Drill 6-1/8" OA lateral geosteering and short tripping as required. 20. Displace OA lateral with clean Bara Drill mud 21. MU whipstock retrieving tool and pull whipstock 22. Run 4 Y2" slotted liner with 2 ?/a" inner string, Baker Hook Hanger and hang off in 7" casing 23. POOH laying down 3 Y2" drill pipe 24. Run in hole with 3-1/2" tubing to top of OA liner 25. Displace 711 casing to 9.1 Ib/gal completion fluid 26. Land tubing hanger 27. Set tubing plug and BPV 28. ND BOP 29. Install and test tree 30. Pull tubing plug and BPV 31. Freeze protect the tubing and annulus 32. Install BPV and secure the well . RD/MO 1. 2. 3. V\ Vl-\:J-L\ 7 . . ( ( MPI-12L 1 Drilling Permit 6. MPI-X1 Nabors 4ES Operations Summar'l 1. 2. 3. 4. 5. 6. 7. 8. MI/RU Nabors 4ES. Circulate out freeze protection with 9.1 ppg brine. Remove tree and install BOP. Pull and stand back the 3 1/2" tubing. Make up the ESP completion and run in on the 3 1/2" tubing. Freeze protect the well. Set tubing plug and BPV. Remove the BOP. Install and test the tree. RD/MO. Hook up flowlines and instrumentation. 8 TREE: FMC Horizontal 3-1/8" 5M . WELLHEAD: FMC Horizontal 11". 5M tbg. head ¡f 11" x 3-1/2", EUE (btm) \ FMC tbg. hanger, 'H' BPV profile PROPOSED COMPLETION MP 1-12 & 1-12L 1 (' KB. ELEV = 64.00' Cellar Box ELEV = 34.00' 108' 20" 92 Ib/tt, H-40 Welded 3 1/2",9.2 Ib/tt, L-80, EUE 8rd Baker Hughes Hook Hanger sys m Centrilift Electric Submersible Pump 7", 26#, L-80, H-521 Casing Drift: 6.151" Casing 10: 6.276" ~,- Multi-lateral Ju ction @+/-9820' I I I I , \ ~ " \ " " ---------------_, , , , OA Horizontal ""'- \7!. - \'d-L 1--. ~ ---- \ --._--------------, I Window in 7" casing @ +/- 9820' I Baker Hughes Conventional Hanger 113372' I 7" Casing Shoe @ 10411' Wellinclination @ Shoe = 92 Degrees \ " \ ~--------------- , " --- -..._------------- OB Horizontal 6-1/8" OB Lateral TD 4-1/2" Slotted Liner & Hanger 113378' I DATE REV. BY COMMENTS Milne Point Unit WELL: 1-12 API NO: 7/24/2001 Jim Rose level 3 Multi-lateral, 3 1/2" ESP Completion BP Exploration (Alaska) 5 pe!r'iI y- SUI1 DRIL-LING seRVIc:es A Halliburton Company Milne Point Unit Alaska Drilling & Wells Proposal Data for MPI-12 L1 WpO5 Vertical Origin: Horizontal Origin: Measurement Units : North Reference: Wen Well It True North Dogleg severity: Degrees per 100 feet (US) Vertical Section Azimuth: 277.958° Vertical Section Description:Wen Vertical Section Origin: 0.00 N,O.OO E Measured Incl. Azim. Vertical Northings Eastings Vertical Depth Depth Section 9820,00 68338 278,887 3677.67 1079.57 N 7778,61 W 7853.17 10187,60 92.229 278.484 3739.26 1133,84 N 8134.20W 8212,85 10477.20 92,229 278.484 3128.00 1176.53 N 8420.42 W 8502.21 10494,46 92,875 271.911 3127.23 1118.99 N 8431.49 W 8519.46 11151,10 92,875 277.911 3694,00 1270.08 N 9092,99 W 9181.26 11199.79 91.169 277.995 3692.49 1275,98 N 9135.24 W 9223.92 12583.17 91.169 277.995 3664.21 1468.36N 10504.90 W 10601. 02 12599.92 90.661 277.971 3664,00 1410,68 N 10521.48 W 10623,71 13372.74 90.661 277.971 3655,00 1577.84N 11286,18 W 11396.53 Current Well Properties Well: Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure Reference: Ref. Geographical Coordinates: RKB Elevation: MPI-12 Wps 6009458.18 N, 551375.14 E 328.78 S, 802.79 W 70026' 11.7316' N. 149034' 52.0644' W 64.00lt above Mean Sea level 64.00lt above Structure Reference North Reference: Units: True North Feet (US) 3500 ~<;) ~~ ~'*' ,,<fi ~v' r;,<$>~ -1'<;) [b'P ~ ,~ ¿,'Þ' r;,~ '!> o\'r:s ~<;)' <of> <o<!>~ @ ~. Q~ ,<!>'~ .¡p~ 0 '. \~ 'j,'fJ' J>':>- 'Þ'I- J>0"" :s,@ ,. ~":>' ~o q'l> -<.: ", ~" <;)" --.J::Cc} ,-f:lO ,'", <t\<:!-b "'--.. ....--....,-- ù<"", ~<;) ~ fb<$>~ rd>-t # #. ~<;)' ~"? ~ # ~'P .~.". . ,cl" ,'iY .&-' ~" ,ö> (j '¡" @'Þ'I-' 0"'" ":>~ Q~ 0(0- .¡:. <ti' í /~ I I \ / 10500 10800' -..~'- 7~ ,Hl'f.!? U T! 31~,'j."iJ ['n' ! ì76,5! N. U~!J,-tl ,¡" ...i',""Ä.. 0>= 0 0 10 II .s::. .~ 4000 / J1!'I-C U Ddr {',,!. Qj (ij u en 7750 Scale: 1 inch = 500ft 8750 8250 DrillQuest 2.00.09.001 Dogleg Rate 6.500 O.<XX> 5.<XX> O.<XX> 4, <XX> O.<XX> 3.<XX> O,<XX> lA RDIU IP 1IIIII1IItlIII11IWS !'- I Milne Point MPI MPI-12 WpO5 DrillQuestN Single Well Target Data for MPI-12 l 1 WpO5 Measurement lk1its: ft Coordinate Target Point TVD TVDss Northings Eastings Northings Eaatlngs Target Name Type ASP4Y ASP4X Shape MPI-12 LI DTlr Poly EnIfyPoin! 3728,()(J 3664,()(J 6010576,68 N 542946.82 E 1176.53 N 8420.42 W Pol)-g.m Boundary Poinl A 3728.()(J 3664,()(J 6010602,00 N 543616,OOE 1197.24N 7751.0K W B 3728,()(J 3664.()(J 60 1O665,()(J N 542637JIOE 1266,98 N 8729,62 W C 3728,()(J 3664,()(J 6O1O862,()(J N 541150,OOE 1414,22 N 1CJ215,23 W D 3728,()(J 3664.()(J 6011009,00 N 540261.00E 1627.34 N 1110.1.19W E 3728.()(J 3664,()(J 6010737,00 N 540222.00 E 1.155,62 N 11144.n7W F 3728,()(J 3664,()(J 6O1O617,()(JN 54111.1,OOE 1229.48 N 1025.1,91 W G 3728.()(J 3664,()(J 6O1O407,()(J N 542598,00 E 1CJ09,26N 8770.40 W H 3728.()(J 3664,()(J 6O1O349,()(J N 54.1582JIO E 944.48 N 7786,82 W MPI-12 LI GeoPoly Enlfy Point 3728,()(J 3664,()(J 6010576,68 N 542946,82 E 1176,53 N 8420,42 W Polygon Boundary Poinl A 3728,()(J 3664,()(J 6O11153,()(J N 540065,00 E 1772.69N 11298,20W B 3728.()(J 3664,()(J 6O1O820.()(J N 5421.10J(E 1425.47 N 92.15.54 W C 3728,()(J 3664.()(J 6O1O684,()(J N 543805,00 E 1277.94 N 7561.52 W D 3728,()(J 3664,()(J 6O1O201.()(J N 543536,00 E 796,80 N 78.13,84 W E 3728,()(J 3664,()(J 60 1O630.()(J N 54()(J65,OO E 1249,70N 11.101.80W MPI-12 LI Tl Enlfy Point 3728,()(J 3664,()(J 6010576,68 N 542946,82 E 1176.5.1 N 8420.42 W Point MPI-12 LI 12 Enlfy Point 3694,()(J 3630,()(J 60 10665.59 N 542273,62 E I 27(!.U8 N 9092,99 W Point MPl-12 LlTI Enlfy Point 3664,()(J 3600,()(J 6010856.35 N 54084.1,78 E 1470.68 N 10521.48 W Point MPI-12 LI T4 EnlfyPoint 3655.()(J 3591.()(J 6010958,23 N 54()(J77.76 E 1577.84 N 1 1286,78 W Point ~ II Design r ~<;) ,f<;) r:!,~ ,ft.!' <#~. ,!>'fi" ~<;)' ~. ,~ f'J'}~ ,,(¡.' ,"~ t/' J," .\,<SJ 'Þ"':' ~rf :§-o @ ~Cj <;f 4; ?f Q~' <öø ~b I 'f / ! ~<;) ,N<;) 1)~ <!><!>'f' 1><f' ". .J.Q' .,$,<;)' ",,:>- c[)-~ ~':- f'J'Þ' ,'I-~ ,,1? . <t$ . .ö\,#"' 'Þ<!>'i> '!>~ :§-@ 6) Cj <6~ 4~';:- ?f Q~' \( -., I11Qil" 114OQc -' ,':C-GC,-,.. ,U!'I.n U 1'1 J6'J4Ji" lTD ;]7§ (,.< S.~§9L,'N I!' 11700 12000" 123OQ.. .c'~X"" \'1P]. n W!';oS MPl-J2 l,l1J ,¡6fj.{",~ 71'D UN!ä,\: m5JI.-ISW 'WI.!.: II n ,(,;5.1;" /'J'!> !.":..'.J.\'.IIl,",,'¡;¡r 9250 9750 Vertical Section 10250 10750 11250 11750 Section Azimuth: 277.9580 (True North) 5 per"'-'Y- 5U" DRILLING seRVices A Halliburton Company Milne Point Unit Alaska Drilling & Wells Proposal Data for MPI-12 L1 WpO5 Vertical Or~in: Well Horizontal rigin: Well Measurement Units: ft North Reference : True North Dogleg severity : Degrees per 100 feet (US) Vertical Section Azimuth: 277.958° Vertical Section Description: Well Vertical Section Origin: 0.00 N.O.OO E Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg Depth Depth Secti on Rate 9820.00 68.338 278.887 3677.67 1079.57 N 7778.61 W 7853.17 10187.60 92.229 278.484 3739.26 1133.84 N 8134,20 W 8212.85 6.500 10477.20 92.229 278.484 3728.00 1176.53 N 8420.42 W 8502.21 0 .1)00 10494.46 92,875 277.911 3727.23 1178.99 N 8437.49 W 8519.46 5.000 11157.10 92.875 277.911 3694.00 1270.08 N 9092.99 W 9181.26 0.000 11199.79 91.169 277.995 3692.49 1275.98 N 9135.24 W 9223,92 4.000 12583,17 91.169 277.995 3664.27 1468.36 N 10504.90 W 10607.02 0.000 12599,92 90,667 277.971 3664.00 1470.68 N 10521.48 W 10623.77 3.000 13372.74 90.667 277.971 3655.00 1577.84 N 11286.78 W 11396.53 0.000 2000 Total Depth: 13372,74ftMO.3655,OOI\TVO 4 112" Ü1ef 13372.7411 MD 3655,0011 1VD ~12L1WPD5 .Y "'~ "",,¡ RIIII IP IWIA IIIUWIG & MUS Milne Point MPI MPI-12 WpO5 DrillQuest~ Single Well Target Data for MPI-12 L 1 WpO5 Measurement Lnils: ft Coordinale Target Point TVD TVDss North in gs Eastlngs Northlngs Eastings Target Name Type ASP4Y ASP4X Shepe MPI-12L1DrlrPoly Entry Point 3728,()(] 3664,()(] 6010576,68 N 542946.82 E 1176.53 N 8420.42 W Pol)'g1!D Boundary Point A 3728,()(] 3664,()(] 6O I 0602,()(] N 543616,00 E 1197,24 N 7751.08 W B 3728.()(] 3664,()(] 6O1O665.()(] N 542637,()[) E 1266,98 N 8729,62 W C 3728,()(] 3664,()(] 6O1O862,()(] N 541 150,00 E 1474,22 N 111215,23 W D 3728,()(] 3664,()(] 601 1 ()(]9.()(] N 540261.00 E 1627,34 N 1IIIH,I9W E 3728,()(] 3664,00 6010737,00 N 540222.00 E 1355.62 N 1I144,fI7W F 3728.00 3664,00 60 1061 7J)() N 541113,OOE 1229.48 N 111253,91 W G 3728,()(] 3664,()(] 6010407,00 N 542598J)() E 118)9,26 N 8770.40W H 3728,()(] 3664,()(] 6010349,00 N 543582,00 E 944.48 N 7786,82 W MPI-12 LI GeoPoly Entry Point 3728,00 3664,()(] 6010576,68 N 542946,82 E 1176.53 N 8420.42 W Polygon Boundary Point A 3728,()(] 3664,()(] 6011153,OON 5400(,5,00 E 1772.69 N 11298,20 W B 3728,()(] 3664,00 6010820,00 N 542130,00 E 1425.47 N 9235.54 W C 3728,()(] 3664,()(] 6010684,00 N 543805,00 E 1277.94 N 7561.52 W D 3728,()(] 3664,()(] 6O1O20J.()() N 543536,00 E 796,80 N 78H84 W E 3728,()(] 3664,()(] 6ll1O630,(J() N 540065,00 E 1249.70 N 11301.80W MPI-12 LI TI Entry Point 3728,()(] 3664,()(] 61110576,68 N 542946,82 E 1176.53N 8420.42 W Point MPI-12 LI 1"2 Entry Point 3694,()(] 3630,()(] 6010665.59 N 542273,62 E 12711.08 N 9092.99 W Point MPI-12 LITI Entry Point 3664,()(] 3600,()(] 6010856,35 N 540843.78 E 1470.68 N IO,~21.48W Point MPI-I2 LI T4 Entry Point 3655,()(] 3591.00 6010958,23 N 540077.76 E 1577.84 N 11286,78 W Point ....-... . Current Well Properties Well: Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure Reference: Ref. Geographical Coordinates: RKB Elevation: MPI-12 Wps 6009458.18 N, 551375.14 E 328.78 S, 802.79 W 70° 26' 11.7316' N, 149034' 52.0644' W North Reference: Units: 64.00ft above Mean Sea Level 64.00ft above Structure Reference True North Feet (US) -. - End OJ,, Start Sa~ @ 90,667" : 12599.92ftMO,3664.00llTVD - -- - - - - -- - \ Begin Ojr @ 3,000"/1001\: 12583,17ft MD, 3664,2711 TVD 1500 (J) 0) c:: .s::: t 0 Z L___,_.-------.- JlI'I.12U ç.: ,,65,>-2') ",'I' ¡S'7..~:S, liZ,'£?fiH' 1000 MN,I! U V -'6M,,;f'1¡:{) ¡.r;'1.6,< X, ]J)'<JI 4-' W +-' Õ 0 1.0 II ~ (.) .S ,.... 500 å) ~ CJ) -11750 Scale: 1 inch = 500ft -10750 -11250 DriliQuest 2.00.09.001 ----------------- End Oir, Start Sail @ 91.169" : 11199,79ftMD.3692.49ftTVD Begin Dir @ 4,000"/10011 : 11157,1011 MD, 3694,0011 TVD End Dir, Start Sail @ 92,875": 10494.46ftMD,3727,23fITVO Begin Oir @ 5,000"/10011 : 10477.2011 MO, 3728,001\ TVO End OJ,, Start Sail @ 92.229": 10187,6OItMO.3739.26ItTVD KOP: TF @ 1.Odeg Left/ Slart Oir @ 6.5"/10011 : 9820,OOIIMD.3677.6711T1° ---,~ <§> "",'" "- "",Os - -\- - ----- MPl-12 Ll - :!::90% Drlr Poly II n -10250 -9750 .£"-d_, ~ ",'fÞ" i',~.=' - ---7 I ..' ",'fÞ" ""¿ " , , "~' ~ / , ,.," " " ------,---- MN.¡Z i.1 n / ¡ }ó'N.(lf! H-U ¡ -J ! .'.7,UJ,< ," 9,¡-}2,?;< W .UN,!!!.!'I'; .P 1.>./I'¡ [H' 1[7',,5} ,Y, ,~'2()A? II' ,\11'/./1 /./ (;""/"'/Y -9250 -8750 -8250 -7750 -7250 Reference is True North Eastings Sperry-Sun Drilling Services Proposal Data - MPI-12 Wps - MPI-12 L1 WpO5 r""""':""","---"-"-""'-"¡-:---"""""C'-' ,""" ..', "," "...... ".""" ,..,",..,"',..".."..,"",..,',.., ""","" "'" """1'",.."""..,..-----..-.-----,-,..-......,...........,...."""",.., """"':==-1 I I ,'MD , ¡ Delta IncUn. Azimuth ¡ TVD Delta Northings Eastings ¡ Dogleg Ii I. Build, I. Turn' Toolface VS (c278°) I , ' ¡ (ft). ,I MD (ft) ,:, (O) , (O) ,I (ft)'. TVD (ft) , (ft), , ,(ft) ,I (o/100ft) i (°/1000)' .' (°/1000)', :' (O),., -', (ft) , I ! ~1 9820.~00¡. ., -,. I 68.338 278.887 3677.671 : 1079.57 Ni 7778.61 Y";.. ".., ......, ,I... ~.499! -0.121,: - . ----,_....1. J8~3.1!1 2 10187.600 367.600 92.229 278A84 3739.26 61.59 1133.84 N 8134.20 W 6.500' 0.000 0.000 359.006 8212.851 , I 3T 10477.198 289.598 92.229 278.484 3728.00 -11.26 1176.53 N 8420.42 W 0.000 3.743 ~3.318 , 0.000 8502.21' ,......, "'.. - ..,...................., . ",-,......._,...,.._- 4: 10494.463 17.265 92.875 277.911 3727.23 -0.77 1178.99 N 8437.49 W 5.000 0.000 0.000 318.463 8519.46 5T 11157.095 662.63292.875277.9113694.00 -33.231270.08N 9092.99W 0.000 .3.99S 0.198 0.000 9181.26 6,,' "1'1Ú}9'.7á5"""'--"42~69Õ""91.169" 277':995 3692.49 -1.51 1275.98N 9135.24W" 4.000 0~006 """'Ö~OÒÕ--, 1'17.171 "-"9223".921 7 12583.1741383.38991.169277.9953664.27 -28.23 1468.36N 10504.90W 0.000 -2.996 -0.148 ,0.000 10607.021 8T, 12599.922 16.748 90.667 277.971 3664.00 -0.27 1470.68 N 10521.48 W 3.000 0.000 0.000 182.820 10623.77ì ! 9T ': 1337'2:740¡""-'772~81'ã' '90.667' 277.971': 3655.00 -9.00 1577.84N 11286.78W: 0.0001""""""0.000" 0.000"""""""-0':0601'11396.531 ~. ~ 10 July, 2001 - 17:05 - 1 - DrillQuest Milne Point Unit Alaska Drilling & Milne Po. ,": MPI-12 Wps "'--, SAL REPORT 10 July, 2001 Surface Coordinates: 6009458.18 N, 551375.14 E (70026' 11.7316" N, 149034' 52.0644" W) Kelly Bushing: 64.00ft above Mean Sea Level '-"'. SpE!I'r'Y-SUI! DRIL.L.ING seRVices A Halliburton Company Proposal Ref: pro9875 Sperry-Sun Drilling Services Proposal Report for MPI-12 Wps - MPI-12 L 1 Wp05 Alaska Drilling & Wells Milne Point Unit Milne Point MPI Measured Sub-Sea Vertical Local Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Rate Section Comment (ft) eft) (ft) (ft) (ft) (°/1000) 9820.00 68.338 278.887 3613.67 3677.67 1079.57 N 7778.61 W 7853.17 KOP : TF @ 1.0deg Left 1 Start Dir @ 6.5°/1000 : 9820.001tMD,3677.67ftTV 7" Casing 9900.00 73.537 278.793 3639.79 3703.79 1091.18 N 7853.30 W 3514.51 E 6.500 7928.75 ~'- 9926.84 75.282 278.763 3647.00 3711.00 1095.13 N 7878.86 W 543488.93 E 6.500 7954.60 Schrader OA 10000.00 80.036 278.682 3662.63 3726.63 1105.96 N 7949.48 543418.23 E 6.500 8026.04 10100.00 86.535 278.576 3674.32 3738.32 1120.85 N 80 543320.00 E 6.500 8125.29 10187.60 92.229 278.484 3675.26 3739.26 1133.84 N 543233.32 E 6.500 8212.85 End Dir, Start Sail @ 92.229°: 1 0187 .60ftM D ,3739 .26ftTVD 10200.00 92.229 278.484 3674.78 3738.78 1135.67N 6010537.70N 543221.05E 0.000 8225.24 10300.00 92.229 278.484 3670.89 3734.89 1150.41 N 6010551.76 N 543122.12 E 0.000 8325.16 10400.00 92.229 278.484 3667.00 3731.00 1165.15 N" 6010565.83 N 543023.19 E 0.000 8425.08 10477.20 92.229 278.484 3664.00 6728.00 1176.53 N 6010576.68 N 542946.82 E 0.000 8502.21 Begin Dir @ 5.0000/100ft : 10477.201 MD, 3728.001t TVD Target - MPI-12 L 1 T1, Geological 10494.46 92.875 277.911 3663.23 3727.23 1178.99 N 8437.49 W 6010579.02 N 542929.73 E 5.000 8519.46 End Dir, Start Sail @ 92.875°: 1 0494.46ftM D ,3727 .23ftTVD 10500.00 92.875 277.911 3662.95 3726.95 1179.75 N 8442.96 W 6010579.75 N 542924.25 E 0.000 8524.99 10600.00 92.875 277.911 3657.94 3721.94 1193.50N 8541.89W 6010592.81N 542825.23E 0.000 8624.86 10700.00 92.875 277.911 3652.92 3716.92 1207.25 N 8640.81 W 6010605.87 N 542726.22 E 0.000 8724.74 10800.00 92.875 277.911 3647.91 3711.91 1220.99N 8739.74W 6010618.94N 542627.20E 0.000 8824.61 10900.00 92.875 277.911 3642.89 3706.89 1234.74 N 8838.66 W 6010632.00 N 542528.19 E 0.000 8924.49 ~ 11000.00 92.875 277.911 3637.88 3701.88 1248.48 N 8937.58 W 6010645.07 N 542429.17 E 0.000 9024.36 ' 11100.00 92.875 277.911 3632.86 3696.86 1262.23 N 9036.51 W 6010658.13 N 542330.15 E 0.000 9124.24 11157.10 92.875 277.911 3630.00 3694.00 1270.08N 9092.99W 6010665.59N 542273.62E 0.000 9181.26 Begin Dir@ 4.0000/1O0ft:11157.10ft MD, 3694.001t TVD Target - MPI-12 L 1 T2, Geological 11199.79 91.169 277.995 3628.49 3692.49 1275.98N 9135.24W 6010671.20N 542231.33E 4.000 9223.92 EndDir,StartSail@91.169°: 11199.79ftMD,3692.49ftTVD 11200.00 91.169 277 .995 3628.49 3692.49 1276.01 N 9135.45 W 6010671.23 N 542231.12 E 0.000 9224.13 11300.00 91.169 277 .995 3626.45 3690.45 1289.92 N 9234.46 W 6010684.45 N 542132.02 E 0.000 9324.11 11400.00 91.169 277.995 3624.41 3688.41 1303.82 N 9333.47W 6010697.68 N 542032.91 E 0.000 9424.09 11500.00 91.169 277.995 3622.37 3686.37 1317.73N 9432.47W 6010710.90N 541933.81 E 0.000 9524.07 11600.00 91.169 277.995 3620.33 3684.33 1331.64 N 9531.48 W 6010724.13 N 541834.71 E 0.000 9624.05 10 July, 2001 - 17:06 Page 2 of 7 DrillQuest 2.00.09.001 Sperry-Sun Drilling Services Proposal Report for MPI-12 Wps - MPI-12 L 1 Wp05 Alaska Drilling & Wells Milne Point Unit Milne Point MPI Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 0 Oft) 11700.00 91 .169 277.995 3618.29 3682.29 1345.54 N 9630.49 W 6010737.35 N 541735.61 E 0.000 9724.03 11800.00 91.169 277.995 3616.25 3680.25 1359.45 N 9729.50 W 6010750.57 N ;;41636.51 E 0.000 9824.01 11900.00 91.169 277.995 3614.21 3678.21 1373.35 N 9828.50 W 6010763.80 N ~1537.41 E 0.000 9923.99 12000.00 91 .169 277.995 3612.17 3676.17 1387.26 N 9927.51 W 6Q10777.02 N 541438.31 E 0.000 10023.97 --~ 12100.00 91 .169 277.995 3610.13 3674.13 1401.17 N 10026.52 W {![6010790.24 N 541339.21 E 0.000 10123.95 12200.00 91.169 277.995 3608.09 3672.09 1415.07N 10803.47 N 541240.11 E 0.000 10223.93 12300.00 91.169 277.995 3606.05 3670.05 1428.98 N 10816.69 N 541141.01 E 0.000 10323.91 12400.00 91 .169 277.995 3604.01 3668.01 1442.89 N 6010829.92 N 541041.91 E 0.000 10423.88 12500.00 91.169 277.995 3601.97 3665.97 1456.1 6010843.14 N 540942.81 E 0.000 10523.86 12583.17 91 .169 277.995 3600.27 3664.27 1 6010854.14 N 540860.38 E 0.000 10607.02 Begin Dir @ 3.0000/100ft : 12583.17ft MD, 3664.27ft TVD 12599.92 90.667 277.971 3600.00 10521.48 W 6010856.35 N 540843.78 E 3.000 10623.77 End Dir, Start Sail @ 90.667° : 12599.92ftMD,3664.0OftTVD Target - MPI-12 L 1 T3, Geological 12600.00 90.667 277.971 3600.00 3664.00"ß' 1 0521.56 W 6010856.36 N 540843.70 E 0.000 10623.84 12700.00 90.667 277.971 3598.83 3662.83 10620.58 W 6010869.54 N 540744.58 E 0.000 10723.84 12800.00 90.667 277.971 3597.67 3661.67 10719.61 W 6010882.73 N 540645.46 E 0.000 10823.83 12900.00 90.667 277.971 3596.51 3660.51 10818.64 W 6010895.91 N 540546.34 E 0.000 10923.82 13000.00 90.667 277.971 3595.34 3659.34 1526.16 N 10917.66 W 6010909.09 N 540447.22 E 0.000 11023.82 13100.00 90.667 277.971 3594.18 3658.18 1540.02 N 11016.69 W 6010922.27 N 540348.10 E 0.000 11123.81 13200.00 90.667 277.971 3593.01 3657.01 1553.89 N 11115.72 W 6010935.46 N 540248.98 E 0.000 11223.80 13300.00 90.667 277.971 3591 .85 3655.85 1567.75 N 11214.75 W 6010948.64 N 540149.86 E 0.000 11323.80 ;-~ 13372.74 90.667 277.971 3591 .00 3655.00 1577.84 N 11286.78 W 6010958.23 N 540077.76 E 0.000 11396.53 Total Depth: 13372.74ftMD,3655.0OftTVD 4 1/2" Liner Target - MPI-12 L1 T4, Geological All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.219° (21-Jun-01) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 277.958° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13372.74ft., The Bottom Hole Displacement is 11396.53ft, in the Direction of 277.958° (True). 10 July, 2001 - 17:06 Page 3 of 7 DrillQuest 2.00.09.001 Sperry-Sun Drilling Services Proposal Report for MPI-12 Wps - MPI-12 L 1 Wp05 Milne Point Unit Alaska Drilling & Wells Milne Point MPI Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment ""-.'-. 9820.00 3677.67 1 079.57 N 7778.61 W 10187.60 3739.26 1133.84 N 8134.20 W 10477.20 3728.00 1176.53N 8420.42 W 10494.46 3727.23 1178.99 N 8437.48 W 11157.1 0 3694.00 1270.08 N 9092.99 W 11199.79 3692.49 1275.98 N 9135.24 W 12583.17 3664.27 1468.36 N 12599.92 3664.00 1470.68 N 13372.74 3655.00 1577.84 N Formation Tops Formati on Plane (Below Well Origin) Sub-5ea Dip Dip Dir. (ft) Deg. Deg. Profile Measured Vertical Depth Depth (ft) (ft) Penetration Point Sub-Sea Depth Northings Eastings (ft) (ft) (ft) Formation Name 1775.00 0.000 0.395 1889.23 1839.00 1775.00 121.24 N 266.14 W Base Pennafrost 3186.00 0.000 0.395 7686.36 3250.00 3186.00 810.11 N 5710.61 W Top Ugnu 3432.00 0.000 0.395 9107.51 3496.00 3432.00 985.82 N 7099.24 W Tog Ugnu M 3487.00 0.000 0.395 9424.94 3551 .00 3487.00 1025.07 N 7409.39 W Schrader NA 3515.00 0.000 0.395 9544.93 3579.00 3515.00 1040.65 N 7524.97 W Schrader NB 3546.00 0.000 0.395 9640.89 3610.00 3546.00 1053.93 N 7614.77 W Schrader NC 3565.00 0.000 0.395 9691.47 3629.00 3565.00 1061.16 N 7661.09 W Schrader NE 3611.00 0.000 0.395 9812.82 3675.00 3611 .00 1078.54 N 7772.03 W Schrader NF 3647.00 0.000 0.395 9926.84 3711.00 3647.00 1095.13 N 7878.86 W Schrader OA 3681.00 0.000 0.395 TSBC (base OA) .--"", 10 July, 2001 - 17:06 Page 4 of 7 DrillQuest 2.00.09.001 Milne Point Unit Formati on Plane (Below Well Origin) Sub-Sea Dip Dip Dir. (ft) Deg. Deg. Formation Tops (Continued) 3709.00 3731 .00 0.000 0.000 Casing details From Measured Vertical Depth Depth (ft) (ft) <Surface> <Surface> <Surface> <Surface> Targets associated with this wef/path Target Name MPI-12 L 1 Drlr Poly Profile Measured Vertical Depth Depth (ft) (ft) 0.395 0.395 To Measured Vertical Depth DePtl:!'"t (ft) (ft1¡¡I¡!¡¡¡ 9820.00 13372.74 Sperry-Sun Drilling Services Proposal Report for MPI-12 Wps - MPI-12 L 1 Wp05 Penetration Point Sub-Sea Depth Northings Eastings (ft) (ft) (ft) Formation Name Target Shape Polygon Alaska Drilling & Wells Milne Point MPI --J Target Type ..-......, Drillers 10 July, 2001 - 17:06 DrillQuest 2.00.09.001 .,¡asing Detail " Casing 1/2" Liner Target Entry Coordinates TVD Northings Eastings (ft) (ft) (ft) Mean Sea LeveVGlobal Coordinates: Geographical Coordinates: 3728.00 3664.00 1176.53 N 8420.42 W 6010576.68 N 542946.82 E 70026' 23.2569" N 149038' 59.2525" W Target Boundary Point #1 #2 #3 #4 #5 #6 #7 #8 3728.00 3728.00 3728.00 3728.00 3728.00 3728.00 3728.00 3728.00 1197.24 N 1266.98 N 1474.22 N 1627.34 N 1355.62 N 1229.48 N 1009.26 N 944.48 N 7751.08 W 8729.62 W 10215.23 W 11103.19W 11144.07 W 10253.91 W 8770.40 W 7786.82 W Page 5 of 7 Milne Point Unit Target Name Targets associated with this well path (Continued) MPI-12 L1 GeoPoly Sperry-Sun Drilling Services Proposal Report for MPI-12 Wps - MPI-12 L 1 Wp05 Mean Sea LeveVGlobal Coordinates #1 #2 #3 rdinates #1 #2 #3 #4 #5 #6 #7 #8 Mean Sea LeveVGlobal Coordinates: Geographical Coordinates: Target Boundary Point #1 #2 #3 #4 #5 Mean Sea LeveVGlobal Coordinates #1 #2 #3 #4 #5 Alaska Drilling & Wells Milne Point MPI Target Entry Coordinates TVD Northings Eastings (ft) (ft) (ft) Target Shape Target Type 10602.00 N 543616.00 E 0665.00 N 542637.00 E 6010862.00 N 541150.00 E 6011009.00 N 540261.00 E 6010737.00 N 540222.00 E 6010617.00 N 541113.00 E 6010407.00 N 542598.00 E 6010349.00 N 543582.00 E 700 26' 23.4678" N 149038' 39.6041" W 70026' 24.1431" N 1490 39' 08.3325" W 700 26' 26.1629" N 149039' 51.9525" W 700 26' 27.6564" N 149040' 18.0272" W 700 26' 24.9832" N 149040'19.2152" W 700 26' 23.7552" N 1490 39' 53.0784" W 700 26' 21 .6077" N 1490 39' 09.5206" W 700 26' 20.9813" N 1490 38' 40.6456" W 3728.00 1176.53 N 8420.42 W Polygon Geological 3664.00 6010576.68 N 542946.82 E 700 26' 23.2569" N 149038' 59.2525" W 3728.00 1772.69 N 11298.20 W 3728.00 1425.47 N 9235.54 W 3728.00 1277.94 N 7561.52 W 3728.00 796.80 N 7833.84 W 3728.00 1249.70 N 11301 .80 W 3664.00 6011153.00 N 540065.00 E 3664.00 6010820.00 N 542130.00 E 3664.00 6010684.00 N 543805.00 E 3664.00 6010201 .00 N 543536.00 E 3664.00 6010630.00 N 540065.00 E , .---- .-..., 10 July, 2001 - 17:06 DrillQuest 2.00.09.001 Page 6 of 7 Milne Point Unit Target Name Targets associated with this wellpath (Continued) MPI-12 L1 T1 MPI-12 L1 T2 MPI-12 L1 T3 MPI-12 L 1 T4 Sperry-Sun Drilling Services Proposal Report for MPI-12 Wps - MPI-12 L 1 Wp05 Target Entry Coordinates TVD Northings Eastings (ft) (ft) (ft) 149040' 23.7585" W 149039'23.1901" W 149038' 34.0418" W 149038' 42.0213" W 149040' 23.8410" W Geographical Coordinates #1 #2 #3 '29.0832" N 25.6959" N 26' 24.2634" N 700 26' 19.5283" N 70026' 23.9391" N Target Shape Point Point Point Point Alaska Drilling & Wells Milne Point MPI Target Type ,.-, Geological Geological Geological Geological ~, 10 July, 2001 - 17:06 DrillQuest 2.00.09.001 " 3728.00 1176.53 N 8420.42 W Mean S~ LeveVGlo~i.Coora¡nates: 3664.00 6010576.68 N 542946.82 E ..'..~, Geographiåâfi'Coordinates: 700 26' 23.2569" N 1490 38' 59.2525" W 3694.00 1270.08 N 9092.99 W LeveVGlobal Coordinates: 3630.00 6010665.59 N 542273.62 E Geographical Coordinates: 70026' 24.1692" N 149039' 18.9997" W 3664.00 1470.68 N 10521.48 W Mean Sea LeveVGlobal Coordinates: 3600.00 6010856.35 N 540843.78 E Geographical Coordinates: 70026' 26.1239" N 149040' 00.9430" W 3655.00 1577.84 N 11286.78 W Mean Sea LeveVGlobal Coordinates: 3591.00 6010958.23 N 540077.76 E Geographical Coordinates: 70026' 27.1668" N 149040' 23.4146" W Page 7 of 7 Næne poo ~1P1-12 160 150 125 100 75 50 25 0 25 50 75 100 125 150 160 IVHL DEf AILS ANTI-COLLISION SElTINGS CO~IPANY DErAILS +Nt.S +E1.W Northing 6009458,190 &sting 551375,010 Latiude LoDgiude Slot NtA Interpolalion MelhodMD Interval: 50,000 Depth Range From: 9820.000 To: 13373.826 Maximum Range: 1530.983 Reference: Plan: MPI-I2LI WpO5 Cal:ulatDD MetIxxI: MIimum CurvalUre Error System: !SCWSA Scan Melbod: Trav CyIDder North Error Surface: Eliplical + Casing WarnIig M.Ibod: Rules Based th Fm Depth To Sum:ylPOO :20.000 13373.827 Phnned: ~1P1-12L1 Wp05 VI SURVliY PROGRAM 1062,653 1136,474 7rF26'11.732N 149°34'52,Q68W 0 ~---------- o/.//" /'/ // // / '---- , '" "" "" , "- '",,-, ~, / ./ / / / / / / i 1/ í í / ¡ í ¡ I ¡ i i i Î ! I I r \ i i i \ /~..-.../--- /'/ / / -~-"""- -'-" -....." "-', '"", .~ ",", '"' " \ '\ , , \ \ '-69- L ~.---- --', """-,- '0, // /// ./ ./ ./ / / / ./ / / / ~ '--....." ""', ~" ";." N"- .... '\, I "\ ...... "\ t:l.. \ , :::E \, "' ' '\ Q \ ,ro '\ \5: '\ "-' ' "N \, ~ \ , \ - \ Q..¡-, \ '<:"\ \ ~i i Q \ i ro \ \ j ; i ! i , ! I i ¡ I I ¡ i ! j / / / i / / / /---------- /' // ./ / / i i / " / í i í ¡ I i I I i \ \ \ \ / /./ // ---' ./ I i " / í ¡ ! ; i i i--- i i i I \ \ \\ , , " \~ '--, ", "'.." '"' " \, \ \ 1 i i í I ; i I i ! ~ ! ì I i \ \ ì ì \ \ , '\ '\ "' \" 270 / / / , , , ; ! i i-- i ¡ i \ \. \. , "' ~ '" '-., -'. .' /,/ ¡ / í ¡ / /í // ~ BP AImeD From 0 9500 10000 10500 11000 11500 12000 ',"" "' '"' , " , , , \ , - , , , , , , \\ \ i i \ i \ --J ¡ i í i i I i i j i i I ! / í / / í i / / / / / / \ \ \ i i i \ ¡ j i í ¡ ; I I ¡ / / / í I / / i / / / / \ \ \ \ \ \ \ \ \ , '\\ "\ "\ \ '"" "", "-,,- "'-., "-,- -'.........~.------ '\ \ \ , , '\ "' "' ./ "'-~ ~. '-,,- """ --"""-.....~ 1iJ()~_// ./ '~ // // ./ ...........---/ "- , "-" "'-...--...... 18 uth (TFO+AZI) [deg] vs Centre to Centre Separation [50ft/in] Colour ToMD 9500 10000 10500 1 1000 11500 12000 14000 90 See MD Jnc Azi TVO 1 9820,00) (,8,200 278,900 3677.415 2 10191.521 92,345 278.478 3739,724 3 IOH8.OOI 92,345 278.478 3728,000 4 10193,462 92,873 277.913 3727,]:96 5 11157,780 92,873 277.913 36<J.t,OO) 6 11200,505 91.166 277.995 3ó92,4<J.t 7 12600,938 91.166 277.995 3f>I'>t,OOO 8 12617,763 90,662 277.971 3663,732 9 13373.827 90,662 277,971 3655,000 T..,1 WIUJ'A11J IWTAII.5 I'~n MI'I-12L1 MWI>+IFR+MS "'en 1 WeDralh: T""'nMI~ l'unMI'I,12 ~82(),OOO KiI<: Kef. IMum: 12:08911511997 16m M. OXJß V,S"".'n An~1o on¡,... +E/.W Slar1in. I'm 10 Tvl> Origin +Nt,S 1H"j.¡) - MI'I,02 (MI'I-02), ,. , . h. - MI'I.o3(MI'I~n¡".."I'" -- MI'I,04A Wa.in~ ' ". her",. ~e"...g (MI'I-OI - MI'I.04(MI'J.04). '!'" I". - MI'I,04(MI'I-04I"'" "" R.k - MI'I,04(POONI (C,I" ,.,.! 'I4AI.I), Ma;'rR.k - MI'I,04 (l'lanN I (I{, '..., ,., '.04A). Ma;'rR.k - MI'I,04(1'OON3(ll"'~!I, '14M, Ma;" R.k - MI'I.o5(MI'I~I5),'!" ,.. - MI'I,06(MI'I,~), "., I'" MI'I,07(MPJ,07), "." ,,", - MI'I.oK(MI'J,08), "." ,.. MI'J,(J9(MI'I.ffi)."'"", MPI,IO(MI'I-IO). "." .'.' MI'I,IO(MPI,OA ~~" 'ok - PunMI'I.II(I'ÜJ1"II:¡; 'I,M..¡'rK.k - Pun~U'I,II(PÜJ1"11 I' 'b¡"R.k - PlmMI'I,12(1'un'.'I", 'i(IERROKS - PunMI'I,13(1'OO"I: 0' 'b;'rR.k - l'~n~fI'l,X1(I'OO't.1 \t: \1a¡>rK.k I'lm~n'I.XI(I'OO'1 1\' !),Mo¡"R.k - l'~nMI'I,12L1 MI'I,12L1 WpO5 ~", -~. I'I1n:MI'I.12L1 Wp05(I'ÜJ1MI'I,1211'ÜJ1~fI'l.12L C"'Uc.] By: )uane H, Vaag,'" l)al<, 07/l00(X}¡ Chedcó: ----- 1"'.:- Rc"",,,w: ----- SECTION I>1ITAII.5 1>..1<:_- +Nt.S +I~-W )I.c~ TI'3<e VS", To,!," 107'1,607 -7778,6M 0,00 0,000 7K53,227 1134,470 ,8137,979 6.50 ,I.())O 1<216,673 1176,672 .8421.093 O,IX! (HID 8502,'104 MPI,IN4Lt TI 1178.873 .8436,378 5,00 .46,1}44 8518,W; 1270,212 -9093,';.14 O,lJ() (urn ~18L829 MI'J,IN4Lt T2 1276,121 .9135,831 4,{)() 177,246 9224.526 1470,8ro .10522,)64 0,00 O,IID 1fYo24,668 MI'J,N4Lt D 1473,197 .1O539,1JB 3,()() -77.22~ 10641.491 1578.028 .11287,734 o,m O,(XXI 11397,j(j.\ MI'J,N4Lt T4 .. ( Sperry-Sun Anticollision Report ( \ Company: BP Amoco Field: Milne Point Reference Site: M Pt I Pad Reference Well: Plan MPI-12 Reference Wellpath: Plan MPI-12L 1 GLOBAL SCAN APPLIED: All well paths within 200'+ 100/1000 of reference Interpolation Method: MD Interval: 100.000 ft Depth Range: 64.000 to 13373.827 ft Maximum Radius: 1530.983 ft Date: 07/10/2001 Time: 16:32:08 Page: 1 Reference: Error Model: Scan Method: Error Surface: Well: Plan MPI-12, True North 12: 08 9/15/199716:0964.0 Db: Oracle Principal Plan & PLANNED PROGRAM ISCW SA Ellipse Trav Cylinder North Ellipse + Casing Co-ordinate(NE) Reference: Vertical (TVD) Reference: Survey Program for Definitive Well path Date: 03/30/2001 Validated: No Planned From To Survey ft ft 64.000 800.000 800.000 9820.000 9820.000 13373.000 Version: Toolcode 9 Tool Name Planned: MPI-12L1 Wp05 V1 (0) Planned: MPI-12L 1 Wp05 V1 (0) Planned: MPI-12L 1 Wp05 V1 CB-GYRO-SS MWD+IFR+MS MW D+I FR+MS Camera based gyro single shots MWD + (FR + Multi Station MWD + IFR + Multi Station Casing Points MD TVD ft ft 13373.000 3655.004 Diameter in Hole Size in Name 4.500 6.125 41/2" Sununary < ---------------------- Offset, Wellpath ---------------------- > Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft Plan MPI-12,Plan MPI-1 13373.827 13373.827 0.010 297.238 -96.448 FAIL: Major Risk M Pt I Pad MPI-02 MPI-02 V1 498.078 500.000 242.230 9.540 232.690 Pass: Major Risk M Pt I Pad MPI-03 MPI-03 V1 498.316 500.000 185.768 13.451 172.319 Pass: Major Risk M Ptl Pad MPI-04A Waiting on r MPI-04A V1 499.006 500.000 122.968 12.342 110.627 Pass: Major Risk M Pt I Pad MPI-04 MPI-04 V5 499.006 500.000 122.968 12.342 110.627 Pass: Major Risk M Pt I Pad MPI-04 MPI-04PB1 V3 499.006 500.000 122.968 12.342 110.627 Pass: Major Risk M Ptl Pad MPI-04 Plan#1 (CTD) MPI-04AL 1 499.006 500.000 122.968 12.342 110.627 Pass: Major Risk M Pt I Pad MPI-04 Plan#1 (Rotary) MPI-O4 499.006 500.000 122.968 12.342 110.627 Pass: Major Risk M Ptl Pad MPI-04 Plan#3 (CTD) MPI-O4A V 499.006 500.000 122.968 12.342 110.627 Pass: Major Risk M Pt I Pad MPI-05 MPI-05 V1 597.340 600.000 211.793 10.133 201.665 Pass: Major Risk M Pt I Pad MPI-06 MPI-06 V10 888.421 900.000 154.823 19.589 135.275 Pass: Major Risk M Pt I Pad MPI-07 MPI-07 V1 598.559 600.000 97.195 17.753 79.446 Pass: Major Risk M Pt I Pad MPI-08 MPI-08 V3 1579.674 1600.000 56.214 29.708 30.839 Pass: Major Risk M Pt I Pad MPI-09 MPI-09 V12 Plan: MPI-O 299.982 300.000 270.373 6.786 263.587 Pass: Major Risk M Pt I Pad MPI-10 MPI-10 V7 2348.067 2600.000 220.275 78.482 144.787 Pass: Major Risk M Pt I Pad MPI-10 MPI-10A V1 2259.048 2501.650 215.009 71.538 146.482 Pass: Major Risk M Pt I Pad Plan MPI-11 Plan MPI-11 L 1 VO Plan 599.008 600.000 25.767 12.713 13.058 Pass: Major Risk M Pt I Pad Plan MPI-11 Plan MPI-11 V2 Plan: M 599.008 600.000 25.767 12.713 13.058 Pass: Major Risk M Pt I Pad Plan MPI-12 Plan MPI-12 V8 Plan: M 9800.000 9800.000 0.000 0.001 -0.001 FAIL: NOERRORS M Pt I Pad Plan MPI-13 Plan MPI-13 V10 Plan: 400.100 400.000 30.238 9.026 21.212 Pass: Major Risk M Pt I Pad Plan MPI-X1 Plan MPI-X1 V2 Plan: M 400.105 400.000 30.691 9.024 21.668 Pass: Major Risk M Pt I Pad Plan MPI-X1 Plan MPI-X1 L 1 V5 Plan: 400.105 400.000 30.691 8.925 21.767 Pass: Major Risk Site: Well: Wellpath: Plan MPI-12,Plan MPI-12L1,MPI-12L1 Wp05 Semi-Major Axis Ref Offset TFO+AZI, TFO-HS Casing ft ft deg deg in 53.803 0.000 278.900 0.000 6.125 53.927 0.449 278.803 0.000 6.125 54.094 1.132 278.688 0.000 6.125 54.272 1.810278.578 0.000 6.125 54.460 2.479 278.478 0.000 6.125 Rule Assigned: Inter-Site Error: Ctr-Ctr No-Go Distance Area ft ft 0.000 194.724 0.000 196.448 0.000 199.002 0.000 201.576 0.000 204.148 Major Risk 0.000 ft Reference Offset MD TVD MD TVD ft ft ft ft 9820.000 3677.415 9820.000 3677.415 9900.000 3703.716 9900.000 3703.716 10000.000 3726.79510000.000 3726.796 10100.000 3738.72010100.000 3738.720 10200.000 3739.377 10200.000 3739.377 Warning FAIL FAIL FAIL FAIL FAIL 10300.000 3735.285 10300.000 3735.285 54.656 3.153 278.478 0.000 6.125 0.000206.757 -76.014 10400.000 3731.19410400.000 3731.194 54.860 3.832 278.478 0.000 6.125 0.000 209.404 -76.580 10500.000 3726.971 10500.000 3726.968 55.081 4.508277.913 0.000 6.125 0.003 212.051 -76.297 10600.000 3721.95810600.000 3721.956 55.300 5.190277.913 0.000 6.125 0.003 214.754 -76.882 10700.000 3716.94610700.000 3716.944 55.527 5.873 277.913 0.000 6.125 0.003 217.483 -77.476 10800.000 3711.934 10800.000 3711.932 55.761 6.557 277.913 0.000 6.125 0.003 220.238 -78.077 FAIL FAIL FAIL FAIL FAIL FAIL ( f J, ", ;, j ,'" DATE 07/06/01 CHECK NO. 00193329 H 193328 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT NET 070201 CKO70201P PYMT OMMENT5: HANDL NG IN8T: 100.00 100.00 Per it to D~il1 ee 8tH - Terrie Hub Ie X4628 or Sandra Ste man X4750 .' . '--YY¡ ,JT " l Z L , HE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ BP EXPLORATION, (ALASKA) 'INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL CllY BANK CLEVELAND. .oHIO No.H 193329 CONSOLIDATED COMMERciAL ACCOUNT 56-389 ~ 00193329 PAY dNEHU~DR ED &c 00/ 1 oq~:**~,****** ******~"**it:~~~*~~*********** Uß D~LLAR " , , ," :' ' :,:,;'" ," .,::DATEt ':AMOONT ~~/ø~/Ol+\,¡;:¡,k '",.'" ~10~{¡;ØA;~ NQj;VALlQAFTERÜ!Ò DAys:, To The ORDER Of ""'. , . ,,",' , "". , ,..ALAS~A qÍL~~~G~S , ' , 'tON~ÊR V ¡;i(T I Q~(tOM~:I SSl{)N: 33:3WE8~ 7TIfIÞtVEI\I\JE ' , ,:'. : SUITE 100 :',." ',', ANCHORAGE . ~Lþß9k: AK 99501 III ~ g :. :. 2 g III I: 0 L. ~ 2 0 :. ß g 5 I: 0 0 a L.'" ~ g III CHECK 1 STANDARD LETTER DEVELOPMENT v D EVELO PMENT REDRILL EXPLORA TION INJECTION WELL INJECTION WELL RED RILL {. i. f-KANSMIT AL LETTER CHECK LI~ 1 CIRCLE APPRO PRIA TE LETTERIP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME /l¡:;J-/2 i.J . CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) v PILOT HOLE (PH) / ANNUL¿R ~~SAL ì ANNULAR DISPOSAL <--> YES ANNULAR DISPOSAL THIS WELL "CLUE" ,""The permit is for a new wellbore segment of existing well C:::ð)-g.~Permit No, API No. fa -<:::3:z. "2'- 2. 3 d .J;?' Production should continue to be reported as a function of the original API number stated above. In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). Annular disposal has not been requested. . . Annular Disposal of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved. . . DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . . ANNULUS L-) YES + SPACING EXCEPTION Templates are located m drive\jody\templates Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. { ~ 15/!JJfCit ¡Jt(lDmrru:. l'LZ) Cl Q no'f S1'j1/l ("'cel- ¡~ C ¡'I e I () ( r cu"th'1 f)r;7 CLrlllU'~ -e1'Î.f)Y€.- LA.fe¿ ,C')1 cLi \¡'tl ¿ý /x¿p:t-r:eLJ-- {I conL/1'hCJ-~ (t?~¡'Îf -MCLT fh¿Ü U,y¡ d..v ~j -fN- xr~ D F f r.øQXwe ç/ UJcc:t£f' pew ¡.u¿Fì OM Ivtl~ .T -/3 (SI/(j/Of) I.-/~ e{f)e(/h'v~ !ö-r.:>!c Cl /c~Ä ' , d~ 1"7 {::sId? \N "~,, n:.~Q.~}".C -\ "'-"" "1: ~ ~ \\ ~ \ ~? "'-c.. "> \'K. ~~ t.a. \1:::)'\"'; \ ~~ ~ cn.c;.. \ .... ~ ~,~~ ~ -\ ~"'- ~~~~~ ~(..C)~t'.~~~ c~ ":t -\~ , ~,~ \}\~~ ~~ ~\~, ,t"f..~c:.rt.~~~"> ~ ~ ~\'Ð~~ ~ 'i>~~~\\èt() ~,\~~ ~'CJ~. ~\\~~\~ ~~ ~ \ \~ ~ I c,. ~\..":. ~ ~ ~....~ -\ '" "> ~~ \ +\ '> ~~~a~t. T~~ t!:)~~ ~~ \(J"(~' c..ú. c:;. '\ ""\. \ ~ \.~ ... \ '" ~ 4: X - \.::~- \' \. ~ " ~\OltD U WELL PERMIT CHECKLIST COMPANY WELL NAME~J-/2.¿J PROGRAM: exp - dev - redrll FIELD & POOL ç?~5"./~ INIT CLASS /)~l/ /-15/1 GEOLAREA <6/ ð ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . . N 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N 3. Unique well name and number. .. . . . . . . . . . . . . . . . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. . . . Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N 7. Sufficient acreage available- in drilling unit.. . . . . . . . . . . N- 8. If deviated, is wellbore plat included.. . . . . . . . . . . .'. . Y N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N 12. Permit can-be issued without administrative approval.. . . . . Y N 13. Can permit be approved before 15-day wait.. . . . . . . . . . Y N 14. Conductor string provided .. . . . . . . .. . . . . . . . . . Y N ~ 15. Surface casing protects all known USDWs. . .. . . . . . . . Yy NN \..... \ or-.. (' -"-,- .... '.- -'~ ....... 'c u ..~J r 16. CMT vol adequate to circulate on conductor & surf csg. . . . . . ~ \- .....3: ~ ,~~... ~ ~\..~ 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y N ~ ..:::> 18. CMT will cover all known productive horizons. . . . . '. . . . . "X (fL) ~\~ ~ ('.J \- \ ~ c- 19. Casing designs adequate for C, T, B & permafrost. . . . . . . G? N 20. Adequate tankage or reserve Pit.. . . . . . . . . . . . . . . . ~,I ~~~\>..~"'-'\c:,J ~~~~~~\~ 21. If a re-drill, has a 1Q..403 for abandonment been approved. . . rot ,~ 22. Adequate wellbore separation proposed.. . . . . . . . . . . . C£) N ~ - 23. If diverter required, does it meet regulations. . . . . . . . . . - "-.)~ 24. Drilling -fluid program schematic & equip list adequate. . ~ . . N 25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N 26. BOPE press rating appropriate; test to ~S()O psig. , N .1::i.~~'P a~~ ~Q~~i:) ~ \d-S-O,~~ t'\" . 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N 28. Work will occur without operation shutdbwn. . . . . . . . . . . N 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y @ 30. Permit can be issued w/o hydrogen sulfide measures. . . . .' Y N 31. Data presented on potential overpressure zones. . . . . . . Y 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y R ,.Q~!9 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . ~I 34. Contact name/phone for weekly progress reports [exploratory ani ANNULAR DISPOSAL35. With proper cementing records, this plan. (A) will contain waste in a suitable receiving zone; . . . . . . . (B) will not contaminate freshwater; or cause drilling waste. .. to surface; " , (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and ' E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINEERING:,' !J!CLAnnular COMMISSION: ~Þ8fP ~ w ~ WM ~- 9~~o/Ó / R })f\,E . ~~ ENGINEERING -~ GEOLOGY APPR DATE serv wellbore seg ~ann. disposal para req - / ) f 2.. <1 ON/OFF SHORE siÜ UNIT# c 0 Z ( 0 -I ~ ::u - -I m - z -I J:- - en :Þ ( ::u m » Y N Y N ~~~@ ~ Com mentsllnstructions: c:\msoffice\wordian\diana\checklist (rev. 11/01/100) ,( ( Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Pennitting Process but is part of the history file. . To improve the readability of the Well History file and to simplify finding information. infonnation of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically , . organize this category of information. ( Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Feb 14 15:17:15 2002 Reel Header Service name............ .LISTPE Date.....................02/02/14 Origin...................STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Tape Header Service name............ .LISTPE Date.....................02/02/14 Origin...................STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 1 AK-MM-11164 T. GALVIN D. FERGUSON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 4 AK-MM-11164 D. LABRECQUE J. PYRONE # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MSL 0) Writing Library. Writing Library. f a OJ ~ ItoLl Scientific Technical Services Scientific Technical Services MPI-12L1 500292303860 BP Exploration (Alaska) I Inc. Sperry-Sun Drilling Services 14-FEB-02 MWDRUN 2 AK-MM-11164 D. LABRECQUE J. PYRONE MWD RUN 10 AK-MM-11164 T. GALVIN J. PYRON 33 13N 10E 2345 3996 63.40 34.70 MWD RUN 3 AK-MM-11164 D. LABRECQUE J. PYRONE ( (, # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 13.500 9.875 6.125 CASING SIZE (IN) 20.000 10.750 7.000 DRILLERS DEPTH (FT) 108.0 2906.0 9916.0 # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS LATERAL SECTION WAS KICKED-OFF IN THE MPI-12/MPI-12 PB1 WELL BORE FROM A WHIPSTOCK, THE TOP OF WHICH WAS POSITIONED AT 9916'MD/3650'TVD. 4. MWD RUNS 1 - 4 (MPI-12 PB1) AND 10 (MPI-12 L1) WERE DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 2 - 4 ALSO INCLUDED PRESSURE WHILE DRILLING (PWD). MWD RUN 10 ALSO INCLUDED AT-BIT INCLINATION (ABI). ROP DATA FROM MWD RUN 9 (WHIPSTOCK/MILL RUN) WERE ADDED TO THE TOP OF MWD RUN 10. 5. THERE IS AN UNEXPLAINED ROP DATA GAP FROM 9566.5'MD TO 9659.5'MD. THERE IS ALSO AN ROP GAP FROM 9916.5' TO 9921'MD¡ THIS IS THE STARTING POINT OF THE MILLING OPERATION FOR THE LATERAL SECTION. 6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D.SCHNORR (GEOQUEST/BP) TO R. KALISH (SSDS), DATED 2/05/02. MWD DATA ARE CONSIDERED PDC. 7. MWD RUNS 1-4, 10 REPRESENT WELL MPI-12 L1 WITH API#: 50-029-23038-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12500'MD/3631'TVD. SROP = SMOOTHED SGRC = SMOOTHED SEXP = SMOOTHED SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE SLIDE = NON-ROTATED INTERVALS $ RATE OF PENETRATION WHILE DRILLING. GAMMA RAY COMBINED. PHASE SHIFT-DERIVED RESISTIVITY (EXTRA RESISTIVITY (SHALLOW RESISTIVITY (MEDIUM RESISTIVITY (DEEP TIME. File Header ( ä It Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.OOO Cormnent Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE ROP FET RPD RPM RPS RPX GR $ 1 clipped curves; all bit runs merged. .5000 START DEPTH 108.5 244.5 244.5 244.5 244.5 244.5 252.5 STOP DEPTH 12500.0 12453.5 12453.5 12453.5 12453.5 12453.5 12446.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ---- BASELINE DEPTH $ # MERGED PBU MWD MWD MWD MWD MWD $ DATA SOURCE TOOL CODE # REMARKS: BIT RUN NO 1 2 3 4 10 MERGED MAIN PASS. $ MERGE TOP 108.5 2916.0 2966.0 5598.0 9916.5 MERGE BASE 2916.0 2966.0 5598.0 9916.0 12500.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 { {" First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 108.5 12500 6304.25 24784 108.5 12500 ROP MWD FT/H 0 2592.55 329.401 24587 108.5 12500 GR MWD API 6.39 135.2 70.6719 24389 252.5 12446.5 RPX MWD OHMM 0.37 2000 17.7279 24419 244.5 12453.5 RPS MWD OHMM 0.06 2000 20.9921 24419 244.5 12453.5 RPM MWD OHMM 0.19 2000 24.4365 24419 244.5 12453.5 RPD MWD OHMM 0.02 2000 28.155 24419 244.5 12453.5 FET MWD HOUR 0.05 535.17 1.73612 24419 244.5 12453.5 First Reading For Entire File......... .108.5 Last Reading For Entire File.......... .12500 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP RPM RPS RPD FET RPX GR $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 108.5 244.5 244.5 244.5 244.5 244.5 252.5 STOP DEPTH 2916.0 2857.5 2857.5 2857.5 2857.5 2857.5 2865.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: 09-0CT-01 Insite 66.16 ( DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O ~I Memory 2916.0 108.0 2916.0 .6 78.4 TOOL NUMBER PB02220HRGF8 PB02220HRGF8 13.500 SPUD MUD 9.30 104.0 8.8 900 21.0 5.100 5.358 4.500 6.000 68.0 64.4 68.0 68.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWD010 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 FET MWD010 HOUR 4 1 68 28 8 l \, ,Ie ~ First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 108.5 2916 1512.25 5616 108.5 2916 ROP MWD010 FT/H 6.55 423.23 147.332 5616 108.5 2916 GR MWD010 API 22.92 117.43 67.9103 5227 252.5 2865.5 RPX MWD010 OHMM 0.42 70.22 20.1148 5227 244.5 2857.5 RPS MWD010 OHMM 0.3 115.97 26.9317 5227 244.5 2857.5 RPM MWD010 OHMM 0.2 2000 36.6016 5227 244.5 2857.5 RPD MWD010 OHMM 0.22 2000 39.5505 5227 244.5 2857.5 FET MWD010 HOUR 0.2 6.2 0.760729 5227 244.5 2857.5 First Reading For Entire File......... .108.5 Last Reading For Entire File.......... .2916 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPM RPS RPX FET RPD GR ROP $ 3 header data for each bit run in separate files. 2 .5000 START DEPTH 2858.0 2858.0 2858.0 2858.0 2858.0 2866.0 2916.5 STOP DEPTH 2905.5 2905.5 2905.5 2905.5 2905.5 2912.5 2966.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): 12-0CT-01 Insite 66.16 Memory ,~ TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units....................... Datum Specification Block sub-type...O ( 2966.0 2916.0 2966.0 .0 .0 TOOL NUMBER PB02219HWRGVF6 PB02219HWRGVF6 9.875 LSND 9.10 50.0 9.6 700 7.4 3.600 3.984 3.900 3.100 70.0 62.6 70.0 70.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 ." ., '/ ~ , First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2858 2966 2912 217 2858 2966 ROP MWD020 FT/H 39.55 379.42 212.258 100 2916.5 2966 GR MWD020 API 19.52 47.64 31.4535 94 2866 2912.5 RPX MWD020 OHMM 1.15 5.19 3.05896 96 2858 2905.5 RPS MWD020 OHMM 1.36 7.78 4.37823 96 2858 2905.5 RPM MWD020 OHMM 0.89 2000 139.398 96 2858 2905.5 RPD MWD020 OHMM 0.06 2000 800.795 96 2858 2905.5 FET MWD020 HOUR 67.35 69.63 68.7444 96 2858 2905.5 First Reading For Entire File......... .2858 Last Reading For Entire File.......... .2966 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type................LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX GR ROP $ 4 header data for each bit run in separate files. 3 .5000 START DEPTH 2906.0 2906.0 2906.0 2906.0 2906.0 2913.0 2966.5 STOP DEPTH 5538.0 5538.0 5538.0 5538.0 5538.0 5544.5 5598.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER ( FT) : 14-0CT-01 Insite 66.16 Memory 5598.0 ( TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O ( 2966.0 5598.0 77.7 83.2 TOOL NUMBER PB02219HWRGVF6 PB02219HWRGVF6 9.875 LSND 9.20 45.0 12.0 1700 6.8 1.940 1.778 1.910 1.900 70.0 77.0 70.0 70.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 ( ( First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2906 5598 4252 5385 2906 5598 ROP MWD030 FT/H 0.02 1901.47 454.642 5264 2966.5 5598 GR MWD030 API 6.39 135.2 65.5357 5264 2913 5544.5 RPX MWD030 OHMM 1.01 2000 12.9 5265 2906 5538 RPS MWD030 OHMM 1.27 2000 15.0344 5265 2906 5538 RPM MWD030 OHMM 0.28 2000 14.5084 5265 2906 5538 RPD MWD030 OHMM 1.92 2000 18.0666 5265 2906 5538 FET MWD030 HOUR 0.05 96.38 1.51905 5265 2906 5538 First Reading For Entire File......... .2906 Last Reading For Entire File.......... .5598 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPM RPS RPD FET RPX GR ROP $ 5 header data for each bit run in separate files. 4 .5000 START DEPTH 5538.5 5538.5 5538.5 5538.5 5538.5 5545.0 5598.5 STOP DEPTH 9916.0 9916.0 9916.0 9916.0 9916.0 9916.0 9916.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): 16-0CT-01 Insite 66.16 Memory 9916.0 5598.0 I {, BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units....................... Datum Specification Block sub-type...O 9916.0 76.5 85.5 TOOL NUMBER PB02219HWRGVF6 PB02219HWRGVF6 9.875 LSND 9.20 48.0 9.8 1200 .0 1.990 1.475 1.930 1.960 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 ]: 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 ( 70.0 96.8 70.0 70.0 First Last ,II" it ii , Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5538.5 9916 7727.25 8756 5538.5 9916 ROP MWD040 FT/H 9.86 2592.55 450.573 8449 5598.5 9916 GR MWD040 API 21.4 130.39 70.3188 8743 5545 9916 RPX MWD040 OHMM 5.16 44.62 10.8772 8756 5538.5 9916 RPS MWD040 OHMM 5.29 46.73 11.1964 8756 5538.5 9916 RPM MWD040 OHMM 5.53 48.16 11.5167 8756 5538.5 9916 RPD MWD040 OHMM 5.98 47.62 12.0278 8756 5538.5 9916 FET MWD040 HOUR 0.05 14.38 0.773012 8756 5538.5 9916 First Reading For Entire File......... .5538.5 Last Reading For Entire File.......... .9916 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR FET ROP $ 6 header data for each bit run in separate files. 10 .5000 START DEPTH 9916.5 9916.5 9916.5 9916.5 9916.5 9916.5 9921.5 STOP DEPTH 12453.5 12453.5 12453.5 12453.5 12446.5 12453.5 12500.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): 09-NOV-01 Insite 66.16 Memory 12500.0 9916.0 12500.0 I( BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O 79.5 93.9 TOOL NUMBER 2270FHAGR4 2270FHAGR4 6.125 Baradril-N 9.20 54.0 8.6 27000 4.8 1.790 1.539 1.600 1.650 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD100 FT/H 4 1 68 4 2 GR MWD100 API 4 1 68 8 3 RPX MWD100 OHMM 4 1 68 12 4 RPS MWD100 OHMM 4 1 68 16 5 RPM MWD100 OHMM 4 1 68 20 6 RPD MWD100 OHMM 4 1 68 24 7 FET MWD100 HOUR 4 1 68 28 8 Name Service Unit Min Max Mean Nsam If 73.0 86.0 73.0 73.0 First Reading Last Reading .( ( ~ DEPT FT 9916.5 12500 11208.3 5168 9916.5 12500 ROP MWD100 FT/H 0 542.3 203.609 5158 9921.5 12500 GR MWD100 API 53.55 111.71 80.2047 5061 9916.5 12446.5 RPX MWD100 OHMM 0.37 2000 32.3752 5075 9916.5 12453.5 RPS MWD100 OHMM 0.06 2000 38.2705 5075 9916.5 12453.5 RPM MWD100 OHMM 0.19 2000 42.3228 5075 9916.5 12453.5 RPD MWD100 OHMM 0.02 2000 40.0936 5075 9916.5 12453.5 FET MWD100 HOUR 0.17 535.17 3.36004 5075 9916.5 12453.5 First Reading For Entire File......... .9916.5 Last Reading For Entire File.......... .12500 File Trailer Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/02/14 Maximum Physical Record. .65535 File Type................LO Next File Name.......... .STSLIB.007 Physical EOF Tape Trailer Service name............ .LISTPE Date.....................02/02/14 Origin...................STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date.....................02/02/14 Origin...................STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File