WELL HISTORY FILE COVER PAGE
XHVZS
This page identifies oversize material and digital information available for this individual
Well History file and weather or not it is available in the LaserPiche file.
Please insure that it remains as the first page in this file.
r;}oj
,
I if 5 Well History Pile #
,
Digital Data
Added to LaserPiche Pile
0 CD's - #
0 DVD's - #
-
0 Diskettes - #
DYes o No
DYes o No
DYes o No
Oversized Material
Added to LaserPiche Pile
0 Maps #
-
0 Mud Logs # _
0 Other #
-
DYes o No
DYes o No
DYes o No
General Notes or Comments about this file.
If any ofthe information listed above is not available in the LaserPiche file you may
contact the Alaska Oil & Gas Conservation Commission to request copies.
Please call Robin Deason at (907) 793-1225 if you have any questions or information
requests regarding this file.
;fjJ¿ ?//f/o? RECEIVED
. STATE OF ALASKA I
ALASKA Oil AND GAS CONSERVATION COM SION SEP 1 3 2006
WEll COMPLETION OR RECOMPLETION REPORT AND lOG I k 0'1 & G C C ..
Alas a I as ons. ommlsslon
A
1 a. Well Status: DOil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class: -..
20AAC 25.105 20AAC 25.110 181 Development D Exploratory
DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 7/6/2006 201-195 306-146
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 10/19/2001 50-029-22208-01-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 10/27/2001 PBU 05-28A
2431' FNL, 4220' FEL, SEC. 32, T11N, R15E, UM 8. KB Elevation (ft): 15. Field 1 Pool(s):
Top of Productive Horizon:
3040' FSL, 5001' FEL, SEC. 29, T11N, R15E, UM 70' Prudhoe Bay Field 1 Prudhoe Bay
Total Depth: 9. Plug Back Depth (MD+ TVD) Pool
4320' FSL, 554' FEL, SEC. 30, T11 N, R15E, UM 12198 + 8790 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 698128 y- 5949039 Zone- ASP4 12235 + 8791 Ft ADL 028326
TPI: x- 697186 y- 5954487 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 696315 y- 5955745 Zone- ASP4 N/A MD
DYes 181 No 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey N/A MSL 1900' (Approx.)
21. Logs Run:
MWD, GR, Memory CNL, CCL
22. CASING, LINER AND CEMENTING RECORD
. SËTTINGDËÞTHM[) SË1"TING DEPTH;rVD HOLE .'. '.. /c <\A,':·Y···
.... .SIZE 'AJ,. ·oJ,,¡:.. · .... · GRADE Top BOTTOM Top BOTTOM SIZË 6..^ ···d~~~~'·<
20" 91.5# H-40 Surface 110' Surface 110' 30" 11 Yards Arcticset
10-314" 45.5# J-55 Surface 3916' Surface 3534' 13-1/2" 1265 sx CS III, 350 sx 'G', TJ 90 sx CSII
7-518" 29.7# L-80 Surface 10150' Surface 8356' 9-7/8" 815 sx Class 'G'
5-1/2" 17# 13Cr80 9837' 10565' 8113' 8682' 6-3/4" 95 sx Class 'G'
2-3/8" 4.7# L-80 9872' 12235' 8140' 8791' 3" 113 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24. <., USINGRË¿OR[)< .... ·x.
'<'./ < '"
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
None 3-1/2",9.2#,13Cr80 4289' - 9911' 9784'
MD TVD MD TVD Kill String: 4-1/2", 12.6#, L-80 2487' None
25. AdrD,. .:... ¡·ETc. > H< ...............
. vt:Mt:...., '<.<.' <
~D SEP 1 tb 20nf DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
'. . "'.. '""~. ~
9423' P&A with 14 Bbls Class 'G'
4150' Set Bridge Plug wI Whipstock on Top
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BsL GAs-McF WATER-BsL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD ...
Flow Tubing Casing Pressure CALCULATED OIL-BsL GAs-McF WATER-BsL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE+
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None RBDMS BFl SEP 1 5 2006
Form 10-407 ReviseÖ 1~Tt; \ N A L
CONTINUED ON REVERSE SIDE
G
28.
GEOLOGIC MARKE
29.
RMATION TESTS
NAME
MD
TVD
Include and brie ummarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
21TS
10614'
8719'
None
Zone 1 B
10580'
8694'
Base of Sadlerochit
11000'
8813'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
31. I ~erebY certify that the ~ing.is true a d correct to the best of my knowledge.
Signed Terrie Hubble Title Technical Assistant
Date 09 13/ ~
PBU 05-28A
Well Number
201-195 306-146
roval No.
Prepared By NamelNumber:
Drilling Engineer:
Terrie Hubble, 564-4628
Jeff Cutler, 564-4134
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: Ifthis well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
·
Page 1 of 2
Digital Wellfile
Well Events for SurfaceWell - 051
Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> FS1 -> 05 -> 05-28
Date Range: 01/Jun/2006 to 13/Sep/2006
Data Source(s): DIMS, AWGRS
Events
Source Well Date
DIMS 05-28 08/09/2006
AWGRS 05-28B 08/09/2006
DIMS 05-28 08/08/2006
DIMS 05-28 08/07/2006
DIMS 05-28 08/06/2006
DIMS 05-28 08/05/2006
DIMS 05-28 08/04/2006
DIMS 05-28 08/03/2006
DIMS 05-28 08/02/2006
DIMS 05-28 08/01/2006
DIMS 05-28 07/31/2006
DIMS 05-28 07/30/2006
DIrvlS 05-28 07/29/2006
DIMS 05-28 07/28/2006
DIMS 05-28 07/27/2006
DIMS 05-28 07/26/2006
DIMS 05-28 07/25/2006
AWGRS 05-28B 07/25/2006
AWGRS 05-28B 07/25/2006
DIMS 05-28 07/24/2006
DIMS 05-28 07/23/2006
AWGRS 05-28A 07/23/2006
AWGRS 05-28A 07/23/2006
AWGRS 05-28A 07/23/2006
DIMS 05-28 07/22/2006
AWGRS 05-28A 07/22/2006
Description
ND BOPE. NU tree and test to 5000 psi. Install BPV and test to 1000 psi from below. Release
rig for summer maintenance at 1630 hours.
PULLED A 4" CIW TWC THRU TREE ON RIG 2ES.
Lay down 4" DP. Test casing to 3500 psi. Run 4.5" tbg kill string, Prepare to ND BOPE.
Ran 5.5" liner, Cemented liner at 11656'. POOH laying down 4" DP.
Finish wiper trip, POOH. Rig up and run 5.5" liner.
Drilled ahead to TD of 11666' MD, 8311' TVD. Circulate hole clean. Wiper trip to window at
4119'.
Drill to 11201', clean hole. Wiper trip to 9144'. Drill to 11295'.
RIH after short trip. Drill ahead to 10649'. Weight up with 14.15 ppg spike fluid to 10.5 ppg
in active system.
Drill to 9331'. Short trip to window at 4119'. Circulate clean.
Drill from 6622' to 8677'.
Drill 6 3/4" hole from 4169' to 6622'.
Run in with drilling BHA and attempt to get out window(failed). Clean out window with
mills.Run in and exit the window with the drilling assembly.
Set whipstock and mill window, Perform Leak off test to 11.47 ppg EMW.
Run USIT log. Change work scope to cut window instead of cut and pull 7 5/8" casing.
Determine collar location in 7 5/8" with casing cutter.
Lay down tubing,Test BOP with 5" and 4". Run cleanout to casing stub, Set bridge plug
@4150'.
Kill well. Test BOPE. Pulled 900' of 4 1/2" tubing.
Move rig on to 5-28B and rig up on well. Start well kill operations.
Pulled a 4" FMC BPV THRU BOP'S ON RIG
SET A 4" FMC BPV PRE RIG
Move sub from PBOC to DS05 and spot on 28B
Moved rig from DS04 to PBOC.
T/IA/OA = BPV/36/240. Temp = 5/1. Monitor OAP (pre-rig). OAP down 10 psi in 6 hrs. lAP up
6 psi.
T/I/O=BPV/30/250 Temp=S/I WHP's (Post pump/Pre rig) lAP down 100 psi, OAP up 70 psi
from initial pressure from 7/22/06.
T/I/O=BPV/140/160 Load IA & OA w/ 9.8 ppg brine (Rig prep) - Load IA w/ 5 bbls meth &
260 bbls 9.8 ppg brine, Load OA w/ 5 bbls meth & 164 bbls 9.8 ppg brine for upcoming rig
work, IA went on a vac, OAP @ 300 psi after SD, Bleed OAP Final WHP's=BPV/0/350
No summary information available in DIMS
T/I/O= BPV/180/175 Temp=S/I Bleed lAP & OAP to 0+ (Pre rig) IA & OA fluid levels are at
surface. Bleed lAP from 180 psi to 130 psi in 1 hr. (11 bbls to tank) Bleed OAP from 175 psi
to 100 psi (3/4 bbl) in 5 min. Pressure increased to 155 psi in 10 min. Standby for Vac truck.
OAP is up to 165 psi. Bleed OAP to 50 psi in 45 min (7.5 bbls to tank).OAP increased to 80
psi in 15 min, lAP holding at 130 psi. FWHP=BPV/130/85
AWGRS 05-28A 07/21/2006 T/I/O=BPV/180/200 Temp=SI Bleed WHPs to 0 psi (prep for sidetrack). IA & OA FLs @
surface. Bled OAP from 200 psi to 90 psi in 80 minutes with 8 bbls returned to slop trailer.
Shut in and monitor for 30 minutes. OAP increased 60 psi to 150 psi. Final
WHPs=BPV/180/150.
AWGRS 05-28A 07/15/2006 T/IA/OA = 51/150/225 Repair Lockdown Screw Was able to free lockdown screw on Tubing
Head. Annulus valve blocking face of pin, unable to use conventional torque wrench, tighten
to approx. 450 ft/lbs., with hand wrench,
AWGRS 05-28B 07/14/2006 Set 4" ISA for pre rig, no problems,
~WGRS 05-28A 07/11/2006 T/I/O = 0/160/110.. Temp = 51. WHPs post-bullhead kill (pre-rig). Tubing decreased 50 psi,
lAP increased 60 psi, OAP decreased 30 psi, all overnight.
AWGRS 05-28A 07/11/2006 T/I/O=40/220/120 Freeze Protect Flow Line (pre-sdtrck) Pumped 5 bbls neat methanol
spear,65 bbls crude and 15 bbls diesel. Final HP's=40/220/120
http://digitalwellfile.bpweb.bp.com/W ellEvents/Home/Default.aspx
9/13/2006
Digital Wellfile
AWGRS 05-28A 07/10/2006
AWGRS 05-28A 07/08/2006
AWGRS 05-28A 07/07/2006
AIJV.GRS 05-28A 07/06/2006
AWGRS 05-28A 07/05/2006
AWGRS 05-28A 07/04/2006
AWGRS 05-28A 06/25/2006
AWGRS 05-28A 06/24/2006
AWGRS 05-28A 06/22/2006
AWGRS 05-28A 06/22/2006
AWGRS 05-28A 06/21/2006
. Page 20f2
T/I/0=320/500/140 Circ-Out & Freeze Protect (shutlpre RWO) Bullheaded 5 bbls Meth,
85 bbls 9.8 ppg Brine and 3 bbls Diesel into TBG, Bullheaded 5 bbls Meth, 182 bbls 9.8 ppg
NaCI Brine and 5 bbls Diesel into IA. Final WHP's=50/100/140
JET CUT TUBING AT 4289' ELM WITH 2.5" SLB POWER CUTTER. TIED INTO GLM AT 3516' TO
CONFIRM DEPTH. POSITIVE INDICATION OF DETONATION SEEN ON SURFACE. CONFIRMED
AFTER POOH. FINAL T/ 1/ 0 = 500/500/ 130. WELL LEFT SHUT IN AND TURNED OVER TO
DSO. ******JOB COMPLETE*****
***WELL S/I ON ARRIVAL *** DRIFT W/ 2.5 CENT, S-BAILER TO TOP OF CEMENT @ 9423'
SLM, S. BAILER EMPTY. DRIFT W/ 2.81" G-RING TO 4500' SLM FOR CHEM CUT. ***WELL
LEFT SHUT IN, DSO NOTIFIED***
CTU 5. P & A. ***Job Co nt' from 7/5/2006 WSR***RIH with BDN...Tag 9892' ctmd..Correct
to 9872' (Top of Baker deployment sleeve)..Pump 14 bbl Class G 15.8# cement...No
bump,.Lay in l/1..Pumped 50 bbls of biozan for contaminate with 3/4" ball for ball drop
nozzle. Contaminated to 9400' at 2: 1 ratio. Chased to surface with 1% XS KCI washing
jewlery. Contaminated cement returns were seen at surface with end of Biozan sweep. Well
freeze protected to 2000' with 30 bbls of 50:50 MeOH. Est TOC @ 9400' CTM. Notified pad
operator of status. *** Job Complete ***
CTU #5. Fish LTTP and P&A. MIRU. MU BHA #1 / Baker GS Spear. RIH to 9840' CTM and
circulated 30 bbl Lubtex pill followed by 130 bbls of 1 % KCI. Engaged fish at 9884' CTM. Fish
released with 1 jar hit. POOH with plug. MU BHA #2/ 2.5" BDN. Bullhead kill well with 160
bbls 1% KCI and RIH. *** Continued on WSR 7/6/2006 ***
T/IA/OA=SI/300/100 Pre-rig well head MIT PPPOT-T-IC { NOTE} tubing hanger has been
injected with Seal Tite product, May have trouble with BOP test. Function all LDS on tubing
spool. OK Pressure up on Seal Tite to 5,000 psi. Function all LDS but [1] under annulus
valve. Can't get socket over LDS because of valve in the way. Test 7-5/8" IC hanger to 3,800
psi.
*** CONT FROM 06-24-06 WSR *** (attempt to pulllttp) JARRED ON LINER TOP FOR 2 HRS
@ 4000#. DECISION MADE TO RIG DOWN. *** DSO NOTIFIED, WELL LEFT SI *** NOTE:
BAITED 1 3/8" OVERSHOT SET ON FISH @ 9824' BLM ( 28" OAL, PULLS W/ 3 1/2" GS)
*** WELL SI ON ARRIVAL, SSV DUMPED ON ARRIVAL *** (pulllttp) RIGGED UP B/L EQUIP,
SET BAITED 1 3/8" OVERSHOT (28" OAL) ON LTTP @ 9835' BLM, JARRED ON LINER TOP FOR
APPROX 3 HRS @ 4000# *** JOB IN PROGRESS/ CONT ON 06-25-06 WSR ***
Assist S-line (Pull LTTP) - Job Canceled
*** WSR CONTINUED FROM 6-21-06 *** (pre sidetrack) RUN 2.75 CENT. & 2" JOC LATCH
PLUG @ 9854' SLM. UNABLE TO PULL LTTP. LRS WAS UNABLE TO PRESSURE TUBING TO
SHEAR DISK IN LTTP DUE TO IA TRACKING TUBING PRESSURE. SWITCHED TO ,125" WIRE.
MADE SEVERAL MORE TRIES TO PULL LTTP WITHOUT SUCCESS. LEFT LTTP IN HOLE. ***
WELL LEFT S/I ON DEPARTURE PAD OPERATOR NOTIFIED. ***
***WELL S/I ON ARRIVAL*** (pre sidetrack) LATCH LTTP @ 9854' SLM W/ 2.75 CENT. & 2"
SB. UNABLE TO PULL. UNABLE TO SHEAR PRESSURE DISK W/TRI-PLEX. CONTINUE TRYING
TO PULL LTTP. IN PROGRESS. *** WSR CONTINUED ON 06-22-06 ***
http://digitalwellfile.bpweb.bp.comIW ellEvents/Home/Default.aspx
9/1312006
ïREE '" FMC ULTRA SLIM HOLE
WELLHEAD = FMC
ACTUATOR = BAKERC
KB. ELBI = 70'
BF. ELBI = NA
KOP= 1300'
Max Angle = 99@11613'
Datum MO = NA
Datum lVO = 8800' SS
05-288
Suspended 08/09/06
10-3/4" CSG, 45.5#, J-55, 10 = 9.950" H 3896'
I Minimum ID = 3.958" in 4" tbg.
5-1/2" LNR MILLOUTWINDOW
4119' - 4132' (OFF Wipstock)
17-5/8" X 5-1/2" BKR LNR HGR H 9837'
1 TOP OF 2-3/8" LNR, 4.7#, 10 = 1.995" H 9882'
3-1/2" TBG, 9.2#, 13-CR-80, -I 9910'
.0087 bpf, 10 = 2.992"
5-1/2" LNR MILLOUT WINDOW
10565' - 10570' (OFF CMT RAMP)
I 7-5/8" CSG, 29.7#, L-80, ID = 6.875" H 10150'
ÆRFORA TION SUMMARY
REF LOG: SWS MEMORY CNLlGRlCCL ON 10/29/01
ANGLEATTOPPERF: 85 @ 10835'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz OA TE
1-11/16" 4 10835 -11090 0 10/28/01
1-11/16" 4 11350 -11550 0 10/28/01
1-11/16" 4 11660 -11745 0 10/28/01
1-11/16" 4 11970 -12085 0 10/28/01
1-11/16" 4 12160 -12185 0 10/28/01
15-1/2" LNR, 17#, 13-CR-80, ID = 4.892" I
10923'
DRLG DRAFT
2487'
4.5" tbg, 12.6#, IBT, 3.958" 10,
kill string with mule shoe cut
3957' Ii 7-5/8 X 5-1/2" BOT ZXP packer I
4119' -TOp of 5.5" liner window
4132' l-i Bottom of 5.5" liner window
4500' H TOC I
I 11656' ~
15-1/2",17#, L-80 Hyd 521 liner 4.892" /01
9784'
9872'
9872'
9899'
9911'
9896'
H 7-5/8" X 3-1/2" BA KER SB-3A A<R I
H2.70"BKROEPLOYMENTSLV,10=2.25" I
-I LTIP (SET 01/15/04) I
I- 3-1/2" OTIS XN NIP, MILLED TO 2.80" 10 I
1-3-1/2" WLEG (SOS) I
I- ELMO TT LOGGED 09/22/91 I
2-3/8" LNR, 4.7#, L-80, .0039 bpf, 10 = 1.920" -i 12235' I
DATE RBI BY COMMENTS DATE REV BY COMMENTS
09/08/91 ORIGINAL COM PLETION
10/30/01 CTD SIDETRACK
11/22/02 CI-VTLP CORRECTIONS
01/15/04 KSB/KK PULL PA TCH; SET L TIP
01/09/06 JRlMS Drill sidetrack/set liner
PRUDHOE BA Y UNrr
WELL: 05-28A
ÆRMrr No: 2011950
API No: 50-029-22208-01
SEC 32, T11N, R15E, 2431' SNL & 4220' WEL
BP Exploration (Alaska)
R~~¿l v L...Ù
AUG 0 8 2006
Schlumbel'gel'
.~ Oil & Gas Cons. Co~
NO. 3883 Anchorage
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
¿)c{ - ¡C¡..5
"'Jr' ~ A ín~l\~i
SCANNEO f.h \;, ,;. ~h -" ,
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave. Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Well Job # loa DescriDtian Date Bl Color CD
NK-43 11211388 PROD P"..... ...... ..........·1 04/02106 1
NK-Z2A 10568415 PRoD ...., I...... W/DI:FT O~ 1
l4-12 N/A WFUlDl 05/09/06 1
l2-21A 10670034 MEM PROD PROFilE 09/20/04 1
13-06A 11217266 INJECTION PROFilE 07/12/06 1
01-178 11209602 MEM PROD PROFilE 04/27/06 1
09-08 11296705 INJECTION PROFilE 07/21/06 1
09-19 11296704 INJECTION PROFilE 07/20/06 1
09-25 11296703 INJECTION PROFilE 07/19/06 1
04-09 11211398 INJECTION PROFilE 04/28/06 1
04-10 11211380 INJECTION PROFilE 03/23/06 1
17-21 11223104 PROD PROFilE W/DEFT 03/22/06 1
18-03B 11057071 SBHP 12/02/05 1
X-15A 11212877 USIT 07/18/06 1
J-01 B 11511430 USIT 07/24/06 1
15-12A 11221595 USIT 07/25/06 1
Z-14B 11217268 USIT 07/29/06 1
S-400 10987564 CH EDIT PDC-GR OF USIT 01/26/06 1
D-03A 11217269 USIT 07/31/06 1
05·28A 11217267 USIT 07/28/06 1
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage. Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street. Suite 400
Anchorage. AK 99503-2838
ATTN: Beth
08/01/06
.
.
e
e
FRANK H. MURKOWSKI, GOVERNOR
AI,ASIiA OIL AND GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Dave Wesley
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
\' \C\ tf
~ù
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 05-28A
Sundry Number: 306-146
Dear Mr. Wesley:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
DATED thistßday of April, 2006
Encl.
() IS 4-{¿fY /.t (/(1fe¡..;J;¡.{),b «tc. LJ /2-7/ ð b
/ ~ STATE OF ALASKA
- ALASKA AND GAS CONSERVATION COIISSION
APPLICATION FOR SUNDRY APPROVAL
20 MC 25.280
~ol\- 4/2.1/2..004>
iVED
APR 2 5 2005
Commission
. .!
1. Type of Request: a Abandon
o Alter Casing
o Change Approved Program
o Suspend 0 Operation Shutdown 0 Perforate 0 Other
o Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well
o Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
4. Current Well Class: /
~ Development 0 Exploratory
o Stratigraphic 0 Service
5. Permit To Drill Number
201-195 /
6. API Number:
50-029-22208-01-00../
99519-6612
70'
9. Well Name and Number:
PBU 05-28A ../
8. Property Designation:
111. . . . .....
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft):
12235 8791 12198
CasinQ LenQth Size
Structural
Conductor
Surface
Intermediate
Productinn
Liner
MD
Effective Depth TVD (ft)
8790
TVD
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
. ..' ' ;
Plugs (measured): Junk (measured):
9872 None
Burst Collapse
ADL 028326
110'
3916'
10150'
20"
10-3/4"
7-5/8"
110'
3916'
10150'
110' 1490 470
3534' 3580 2090
8356' 6890 4790
8113' - 8682' 7740 6280
8140' - 8791' 11200 11780
Liner
728'
2363'
5-1/2"
2-3/8"
9837' - 10565'
9872' - 12235'
Perforation Depth MD (ft): I Perforation Depth TVD (ft): I
10835' - 12185' 8805' - 8789'
Packers and SSSV Type: 7-5/8" x 3-1/2" Baker 'SB-3A' packer
Tubing Size:
3-1/2',9.2# x 4-1/2',12.6#
Tubing Grade:
13Cr80
Packers and SSSV MD (ft): 9784'
I
Tubing MD (ft):
9911'
12. Attachments:
~ Description Summary of Proposal 0 BOP Sketch
o Detailed Operations Program
14. Estimated Date for
Commencing Operations:
13. Well Class after proposed work:
o Exploratory ~ Development 0 Service
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name J~ave Wesley /"\ Title Senior Drilling Engineer
. '¿ _ £ Prepared By Name/Number:
SiQnature It'c8tt 1(£ /: 't--.. Phone 564-5153 Date Ý IZ0Gb Terrie Hubble, 564-4628
/ i' Commission Use Only
May 15, 2006
Date:
15. Well Status after proposed work:
o Oil 0 Gas
o WAG 0 GINJ
".,/
o Plugged ~ Abandoned
o WINJ 0 WDSPL
Contact Jeff Cutler, 564-4134
Conditions of approval: Notify Commission so that a representative may witness
I Sundry Number: (~fJ - /4 ÚJ
o Plug Integrity æ(BOP Test 0 Mechanical Integrity Test
Test- ßoe E- +0 ~çoo (>U .
Other:
A-erh91.1td r:öÝ!AA- 10 - 40 l V ~
o Location Clearance
RBDMS 8Fl APR 2 8 2006
~i' $.( ck ~tl4-
~ {( 0 S # ?, f g .
S"''',,,"ool Fom Req";.oo, I '" -czJ
Approved By: T J
Fom 1()-4Q3 R<w;'''' 0712005 0 R 1G I ~
COMMISSIONER
APPROVED BY
THE COMMISSION
Date
4-28,ðb
Submit In Duplicate
-
e
e
Obp
To:
Winton Aubert - AOGCC
Date: April 19, 2006
From:
Jeff Cutler - BPXA GPB Rotary Drilling
Subject:
Reference:
05-28A Application for Sundry Approval - P&A for Sidetrack Operations
API # 50-029-22208-01
Approval is requested for the proposed P&A of PBU well 05-28A. Well 5-28A was completed as a Z1 CTO
sidetrack in November 2001 and produced steadily until April 2002 when a Cretaceous casing and tubing
leak developed. The initial leak filled the tubing with sand which prevented the Cretaceous water from
damaging the Ivishak. In April 2003, a tubing patch was set to repair the tubing leak. Coiled-tubing
cleaned the Cretaceous sand from the tubing and nitrogen-lifted the well to production. 5-28A produced
for 3 months before developing a second tubing leak. A second tubing patch was set in September 2003
but the well was unable to produce. No sand was observed in the tubing after the second leak and the
Cretaceous water likely damaged the near-wellbore formation preventing the well from flowing. The well
has been shut in since 1/03 due to a TxlA annular communication and a production casing leak. A
sidetrack to re-establish the well as an Ivishak Zone 1 A/1 B producer is seen as the best way to maximize
the value of the wellbore. The sidetrack is currently scheduled for Nabors rig 2ES, beginning mid July
2006. The pre-rig work for this sidetrack will begin at the Well's Group earliest convenience after sundry
approval.
Current Condition:
./ TxlA comm, PC Leak - Secured by L TTP 1/15/04.
./ 12/06/05: MITOA Failed, LLR = 2 bpm @ 480 psi
./ 5-1/2': 17#, L-80 tubing landed at 10,923'.
./ 4-1/2" OTIS HRQ SSSV nipple @ 2238'
./ 4-1/2" X 3-1/2" XO @ 2987'
./ 7-5/8" X 3-1/2" Baker SB-3 packer @ 9784.
./ L TTP @ 9872'
Scope
Pre-Ria ODerations:
1. Bleed the OA, IA and tubing pressures to zero. Test the IC (75/8") pack-off to 3,000 psi, test the
tubing pack-off to 5,000 psi. Function all LOS, repair or replace as necessary.
2. RU slickline. RIH and pull LTTP set at 9872'. /
3. RU CT. RIH to the top of the 2-3/8" liner at 9872. P&A the wellbore by bullheadi 10 bbls/15.8 ppg
cement down the 2-318" liner after the cement is bullheaded into the liner lay an ther 4 b Is of 15.8
ppg cement on top of the liner in the 3-1/2" tubing. This should leave TOC at -94 1" above the
completion packer at 9784'. Cement volumes based on the following:
2325' of 2-3/8",4.7# liner @ 0.0039 bpf = 9.0 bbls
462' of 3-1/2",9.2# liner @ 0.0087 bpf = 4.0 bbls /
4. RU E-line. RIH and jet cut the 3-1/2" tubing in the middle of a joint - 4,300'.
5. Circulate the well to SW. Freeze protect the IA and tubing with diesel to - 2,200'.
6. Bleed all pressures to zero. Set BPV. Secure well.
7. Remove the well house and flow-line. If necessary, level the pad.
Ria ODerations:
1. MI/RU Nabors 2ES.
2. Pull BPV. Circulate out freeze protection and displace the well to SW.
05-28A Application for Sundry
e
e
3. Monitor the OA, IA and tbg for pressure. Verify the well is dead.
4. Install a TWC. Nipple down the tree and adapter flange.
5. Nipple up the BOPE and test per Permit requirement. Pull the TWC. ./
6. Pull the 4 1/2" X 3 1/2" tubing from the pre-rig cut at - 4,300'.
7. MU drift assembly and RIH to the tubing stump, PU 5" drill pipe singles. POH.
8. MU and RIH with a 7 5/8" HES CIBP, on 5" drill pipe. Set the CIBP at -4,100'. Test CIBP to 3,500psi.
9. Displace the well to 8.8ppg milling fluid, per MIDF recommendation. Spot an 18ppg viscous pill from
the CIBP to the planned casing cut depth of -4,000'md. POH.
10. CO to 7 5/8" pipe rams and test.
11. MU a Baker Multi-string cutter. RIH and cut the 7 5/8" at 4,000' MD. Attempt to circulate through the
cut to confirm a 'free' annulus. POH. LD multi-string cutter.
12. MU a casing spear, per Baker recommendation. BOLDS and pull the 7 5/8" casing free. LD the 7 5/8"
casing from the cut. /
13. MU a 3 Y2" cementing stinger assembly. RIH to CIBP, spot a -45~bl, balanced 17.0 ppg kick-off
cement plug, calculated on a gauge 9-7/8" hole behind the 7 5/8"" casing this should leave cement
-315' inside the 10-3/4" surface casing. POH above the ceme and circulate string clean. POH, UD
stinger assy. '...
14. CO to 3 112 X 6" VBR and test. WOC as required.
15. MU a 9 7/8" drilling assembly with DIR/GR/RES/PWD.
16. RIH to tag cement top. Confirm a solid cement plug. Test the 10 3,4" casing to 3,500psi'for 30 minutes.
Record the test. TU~ lo - 4-0 ~ OJJ~I/",", ( .
ress the cement down to the surface snde'.
18. Drill 20' of new hole and conduct a LOT.
19. Kick off and drill the 9 7/8" intermediate interval, per directional plan, to the top Sag River.
20. Circulate and condition hole. POH, UD 5" drill pipe and drilling assembly.
21. Run a 7 5/8",29.7#, BTC-M long string. Cement the 7 5/8" via 2 stages, utilizing a HES ES-cementer.
The first stage TOC will be -1 0,200'md. The second stage TOC will be -5,000'md.
22. MU sufficient 4" drill pipe to reach planned TO of 14,461 'md.
23. MU a 6 3/4" DIR/GR/Res drilling assembly.
24. RIH to the ES-Cementer equipment. Test the 7 5/8" casing to 3,500psi. Drill out the ES-Cementer
equipment and continue in hole to the float equipment.
25. R/U and test the 7 5/8" casing to 3,500psi for 30 minutes. Record the test.
26. Drill the float equipment and cement to the shoe.
27. Displace the well to the 8.5ppg Flo-Pro system.
28. Drill out the shoe and 20' of new formation. Circulate to consistent mud properties and conduct an FIT
to 10.0ppg EMW.
29. Drill ahead, per directional proposal, to the planned horizontal landing point in Zone 1 A. CBU.
30. POH for bit I bha.
31. MU a 6 3/4" DIR/GR/Res/Den/Neu drilling assembly. RIH, acquire MAD pas data, per rig site
geologist, through the build interval.
32. Drill the horizontal section to TO, estimated at 14,461 'md.
33. CBU, srr as needed, and circulate hole in preparation of running the 4 W' liner. Spot a liner running
pill. POH, UD XS drill pipe and drilling assembly.
34. Run and cement a 4 1/2", 12.6#, L-80 liner to approximately 150' into the 7 5/8" casing.
35. Set the liner top packer and displace the well to clean seawater above the liner top. POH and UD
LRT.
36. Test the casing X liner to 3,500psi for 30 minutes. Record the test.
37. MU Schlumberger 2 7/8" Power-jet tcp guns, at 6spf, and 2 7/8" drill pipe. RIH, tag, space, and fire
guns. Perforation interval(s) to be determined by subsurface team. POH, UD all drill pipe and tcp
guns.
38. Run a 4 1/2", 12.6#, L-80 completion, tying into the 4 1/2" liner top. Space and land the completion.
RILDS.
39. Reverse circulate sea waterlcorrosion inhibitor per MIDF representative.
40. Drop the balllrod to seat. Set the production packer.
41. Individually test the tubing and the annulus to 3,500psi for 30 minutes. Record each test.
42. Shear the 'DCK' valve in the #5 GLM. Confirm shear with adequate flow in each direction.
43. Install a TWC and test.
44. NID the BOPE. N/U the adapter flange and tree. Test the tree and adapter to 5,000psi.
45. Pull the TWC.
46. R/U LRHOS. Reverse in sufficient volume of diesel to freeze-protect both the tubing and annulus to
-2,200'. Allow the diesel to U-tube to equilibrium.
05-28A Application for Sundry
-
e
47. Install a SPV and test. Remove secondary annulus valve. Secure the well.
48. RD/MO.
Post-RiQ Work:
1. Install well-house and flow-line.
2. MI/RU slickline. Pull the ball and rod 1 RHC plug from 'X' nipple below the new production packer.
TiminQ:
Estimated Pre-rig operations start date:
Estimated Rig operations 1 spud date:
05/15/06
07/15/06
Jeff Cutler
Operations Drilling Engineer
564-4134
05-28A Application for Sundry
-TREE = FMC ULTRA SLIM HOLE
WELLHEAO = FMC
ACTUA TOR"= BAKER C
KB. ELEV = 70'
BF. ELEV = NA
KOP = 1300'
Max Angle = 99 @ 11613'
Datum MO = NA
Datum ïVO = 8800' SS
4-1/2" TBG, 12.6#, 13-CR.
.0152 bpf, 10 = 3.958"
110-314" CSG, 45.5#, J-55, 10 = 9.950" I
e
2985'
Minimum ID = 1.995" @ 9882'
TOP OF 2-3/8" LN R
05-28A
.
S.NOTES: 4-1/2" & 3-1/2" CHROMETBG &
5-1/2" CHROME LNR. WELL ANGLE> 700 @
10735' & > 900 @ 11017'.
2238' 4-1/2" OTIS HRQ SSSV NIP, 10 = 3.813"
2987'
-14-1/2" X 3-1/2" XO, 10 = 2.992"
ST MO ïVO
1 3516 3140
2 5984 5119
3 7723 6473
4 8706 7211
5 9255 7601
6 9674 7918
GAS LIFT MANDRa.s
OEV ìYÆ VLV LATCH
36 FMHO DMY RK
37 FMHO DMY RK
41 FMHO DMY RK
44 FMHO OMY RK
43 FMHO DMY RK
40 FMHO OMY RKP
PORT DATE
o 09/28/02
o 09/28/02
o 09/28/02
o 09/28/02
o 09/28/02
o 09/28/02
9784' -17-5/8" X 3-1/2" BAKERSB-3A PKR I
7-5/8"X5-1/2"BKRLNRHGR I 9837'
9872' -12.70" BKR DEA...OYMENT SLV, 10 = 2.25" 1
1 TOP OF 2-3/8" LNR, 4.7#, 10 = 1.995" I 9882' 9872' -1 LTTP (SET 01/15/04) I
9899' -13-1/2" OTIS XN NIP, MILLED TO 2.80" ID I
3-1/2" TBG, 9.2#, 13-CR-80, 9910' 9911' -13-1/2" WLEG (SOS) I
.0087 bpf, 10 = 2.992"
9896' 1-1 ELMO TT LOGGED 09/22/91
I 7-5/8" CSG, 29.7#, L-80, 10 = 6.875" I
10150'
PERFORA TION SUMMARY
REF LOG: SWS MEMORY CNLlGRlCCL ON 10/29/01
ANGLE AT TOP PERF: 85 @ 10835'
Note: Refer to Production OB for historical perf data
SIZE SPF INTERV AL Opn/Sqz OA TE
1-11/16" 4 10835 -11090 0 10/28/01
1-11/16" 4 11350 -11550 0 10/28/01
1-11/16" 4 11660 - 11745 0 10/28/01
1-11/16" 4 11970 -12085 0 10/28/01
1-11/16" 4 12160 -12185 0 10/28/01
15-1/2" LNR, 17#, 13-CR-80, ID = 4.892" I
10923'
DATE
09/08/91
10/30/01
11/22/02
09/28/02
05/08/03
07/30/03
REV BY
COMMENTS
ORIGINAL COM PLETION
CTD SIDETRACK
CORRECTIONS
GL V C/O
PULL FISH
PA TCH & MIN 10 CORRECTION
OA TE REV BY
08/19/03 CMOITLP
09/14/03 BJMcLITL
10/22/03 MJAITLH
12/28/03 JBIWPAG
01/15/04 KSB/KK
COMMENTS
OA TUM MO CORRECTION
ECLIPSE PA TCH
MIN 10 CORRECTION
LNR 10 CORRECTION
PULL PATCH; SET L TTP
PRUDHOE BAY UNIT
WELL: 05-28A
PERMIT No: 2011950
API No: 50-029-22208-01
SEC 32, T11 N, R15E, 2431' SNL & 4220' WEL
CHlTLP
MHlKAK
JJ/KAK
??/KAK
5-1/2" LNR MILLOUTWINDOW
10565' - 10570' (OFF CMT RAMP)
2-3/8" LNR, 4.7#, L-80, .0039 bpf, 10 = 1.920" -1 12235' 1
BP Exploration (Alaska)
. ,
. 05-288 Propo.d Completion e
2,200 ~14 1/2" 'X' landing nipple, ID = 3.813" I
TREE =
WELLHEAD =
ACTUATOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum Mò =
Datum 1VD =
FMC SLIM HOLE
Frv1C
BAKER C
70'
NA
1300'
99 @ 11613'
NA
8800'SS
103/4",45.5#, J-55, 1 3,896 GAS LIFT MANDRELS
L-80, csg ID = 9.950" ST MD 1VD DEV TYPE VLV LATCH PORT DATE
5 1BD 3150 41/2" X 1" KBMG DCK BK
4 1BD 4750 4 1/2" X 1" KBMG DMY BK
3 1BD 6000 41/2" X 1" KBMG DMY BK
2 1BD 7000 41/2" X 1" KBMG DMY BK
1 1BD 7900 41/2" X 1" KBMG DMY BK
75'8'CIBP H
Pre-rig tbg cut. 3 1/2"'1
9.2#, 13-CR-80
~100
4,300
I 5 1/2" liner top H
9,837
75/8",29.7#, L·80,
csg ID = 6.875"
1 10,150 I
51/2", 17#. 13CR-
80, liner ID = 4.892"
110,923 I
I 11,376 H41/2" 'X'landing nipple,ID= 3.813" I
11,396 H Baker 7 5/8" X 4 1/2" S-3 pkr
11,418 H4 1/2" 'X' landing nipple, ID = 3.813"
11,438 H4 1/2" 'XN' landing nipple, ID = 3.725"1
Baker 7 5/8" X 4 1/2" HMC liner
hngr, ZXP pkr, with TBS
I 11,608 H7 5/8", 29.7#, L-80, BTC-Mcsg
I 14,375 H PBTD I
I 14,461 H4 1/2", 12.6#, L-80, IBT-M liner
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/08191 ORIGINAL COM PLETION 08/19/03 CMOfTLP DATUM MD CORRECTION
10/30/01 CTD SIDETRACK 09/14/03 BJMcUTL ECLIPSE PA TCH
11/22/02 CHlTLP CORRECTIONS 10/22/03 MJAfTLH MIN ID CORRECTION
09/28/02 MHlKAK GLV C/O 12/28/03 JBIvVPAG LNR ID CORRECTION
05/08/03 JJ/KAK PULL FISH 01/15/04 KSB/KK PULL PATCH; SET L TIP
07/30/03 ??/KAK PATCH & MIN ID CORRECTION 11/17/05 RP/dew 5-28B Wp08
PRUDHOE BAY UNrr
WELL: 05-28B
PERMrr No:
API No: 50-029-22208-02
SEC 32, T11 N, R15E, 2431' SNL & 4220' WB.
BP Exploration (Alaska)
·
I
PRUDHOE BAY, PRUDHOE OIL
50
5
"
10
0.5
(
_ Ratio ( Mcf/bbl )
V\átsr Cut %
0.1
0.05
0.01
2001
Data
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc
::., - ;,I"
STATE OF ALASKA REGEn/ED
ALASKA OIL AND GAS CONSERVATION COMMISSION ., -~
REPORT OF SUNDRY WELL OPERATIONgAAR 2 5 200.
1. Operations Performed:
Abandon 0
Alter CasingD
Change Approved ProgramD
2. Operator
SuspendD
RepairWeliD
Pull TubingD
Operation Shutdown 0
Plug PerforationsO
Perforate New Pool 0
4. Current Well Class:
i'1::!,~¡:. Iii ./ F~"¡ ::;:",; (;11, -:!'1<'~¡Dn
Perforate 0 Waiver~p""t,,~.. [':"- Other!]
Stimulate D Time ExtensionÓ' '...
Re-enter Suspended Well 0 Pull Patch
5. Permit to Drill Number:
201-1950
Name:
BP Exploration (Alaska), Inc.
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
Development [X]
70.00
8. Property Designation:
ADL-0028326
11. Present Well Condition Summary:
Stratigraphic D
9. Well Name and Number:
05-28A
10. Field/Pool(s):
Prudhoe Bay Field / Prudhoe Oil Pool
ExploratoryD
ServiceD
6. API Number
50-029-22208-01-00
Total Depth measured 12235 feet
true vertical 8791.4 feet
Effective Depth measured 12198 feet
true vertical 8789.9 feet
Plugs (measured)
Junk (measured)
None
None
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 39 119 39.0 - 119.0 1490 470
Liner 1091 5-112" 17# 13Cr80 9837 - 10928 8113.4 - 8809.6 7740 6280
Liner 2363 2-3/8" 4.7# L-80 9872 - 12235 8140.3 - 8791.4 11200 11780
Production 10116 7-5/8" 29.7# L-80 34 - 10150 34.0 - 8355.7 6890 4790
Surface 3878 10-3/4" 45.5# J-55 38 - 3916 38.0 - 3533.5 3580 2090
Perforation depth:
Measured depth: 10835 -11090, 11350 -11550,11660 -11745,11970 -12085,12160 -12185
True vertical depth: 8804.91 - 8809,8811.84 - 8809.07,8796.3 - 8794.34,8793.71 - 8784.06,8786.99 - 8789.19
Tubing ( size, grade, and measured depth):
4-1/2" 12.6# 13Cr80
3-1/2" 9.2# 13Cr80
@ 34
@ 2987
2987
9911
Packers & SSSV (type & measured depth):
3-1/2" Baker SB3-A 9 CR Packer
5-1/2" Baker Hydro Set Packer
@
@
9784
9837
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
Representative Dailv Averaae Production or Iniection Data
Gas-Met Water-Bbl Casing Pressure
9.5 2084 700
13
Prior to well operation:
Subsequent to operation:
Oil-Bbl
460
Tubing Pressure
261
Well Shut-In
100
100
14. Attachments:
15. Well Class after proposed work:
ExploratoryD
DevelopmentŒ
ServiceD
Copies of Logs and Surveys run -
16. Well Status after proposed work: Operational Shutdown D
Oil [X] GasD WAG D GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
SUndry Number or N/A if C.O. Exempt:
N/A
Daily Report of Well Operations, !
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
23~~
Title
Production Technical Assistant
Signature
Form 10-404 Revised 12/2003
Phone 564-4657
ORIGINAL --Bf~
.
Date
3/23/04
WI 3 .J IOU'
... ':i'
05-28A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
01/14/04 T/I/O=150/700/100 PUMP 20 BBLS CRUDE DOWN TBG TO ASSIST HES PULLING
PATCH
01/14/04 PULLED 3-1/2 UPPER ECLIPSE PACKER & PATCH.
01114/04 T/I/O=10/800/50. IA FL FOR WIRE LINE). IA FL @ 300'.
01/15/04 PULLED LOWER WFD ECLIPSE PACKER @6632' SLM.
SET L TTP @ 8951' SLM. (1-318" FN, 26" OAL, SIP=750 PSI)
RDMO.
01/16/04 T/I/O=720/60010. (PRE LOAD). TBG FL @ 1770' (27 BBLS), IA FL @ SURFACE.
01/21/04 T/I/O 800/64010. LOAD TBG & IA WI 9.8 INHIBITED BRINE. (SECURE WELL, PC LEAK).
SPEAR IN WI 5 BBLS METH FOLLOWED BY 110 BBLS 9.8 BRINE. 5 BBL DIESEL CAP
DOWN TBG. SPEAR IN WI 5 BBLS METH FOLLOWED BY 9.8 BRINE WI 5 BBL DIESEL
CAP DOWN IA. RDMOL FINAL WHP'S 100/75/0.
01/23/04 TIO= 100/100/50. WELL SI. MONITOR WHP'S. (POST BRINE LOAD).
FLUIDS PUMPED
BBLS
20
10
10
304
344
Crude
Methanal
Diesel
9.8 Brine
TOTAL
Page 1
( STATE OF ALASKA ('
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Development Œ]
Stratigraphic D
9. Well Name and Number:
05-28A
10. Field/Pool(s):
Prudhoe Bay Field 1 Prudhoe Oil Pool
1. Operations Performed:
Abandon D
Alter Casing 0
Change Approved Program 0
2. Operator
Suspend D
Repair Well[&]
Pull TubingD
Operation Shutdown D
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
Name:
BP Exploration (Alaska), Inc.
3. Address: P.o. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
70.00
8. Property Designation:
ADL-0028326
11. Present Well Condition Summary:
Total Depth
measured 12235 feet
true vertical 8791.4 feet
Plugs (measured)
Junk (measured)
Effective Depth
measured 12198 feet
true vertical 8789.9 feet
Perforate D WaiverD
Stimulate 0 Time Extension 0
Re-enter Suspended Well 0
5. Permit to Drill Number:
201-1950
OtherD
Exploratory 0
Service 0
6. API Number
50-029-22208-01-00
None
None
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 39 119 39.0 119.0 1490 470
Liner 1091 5-1/2" 17# 13Cr80 9837 - 10928 8113.4 - 8809.6 7740 6280
Liner 2363 2-3/8" 4.7# L-80 9872 - 12235 8140.3 - 8791.4 11200 11780
Production 10116 7-5/8" 29.7# L-80 34 10150 34.0 8355.7 6890 4790
Surface 3878 10-3/4" 45.5# J-55 38 - 3916 38.0 - 3533.5 3580 2090
Perforation depth:
Measured depth: 10835 -11090,11350 -11550,11660 -11745
True vertical depth: 8804.91 - 8809, 8811.84 - 8809.07, 8796.3 - 8794.34
Tubing ( size, grade, and measured depth):
4-1/2" 12.6# 13Cr80 @ 34
3-1/2" 9.2# 13Cr80 @ 2987
3-1/2" Baker SB3-A 9 CR Packer
3-1/2" Eclipse Patch Packer
3-1/2" Eclipse Patch Packer
5-1/2" Baker Hydro Set Packer
Packers & SSSV (type & measured depth):
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13
2987
9911 VEO
@ 9784 RECE\
@ 6636
@ 6663 JAN 2 1 2004
@ 9837
Maska ,
~nthOfage
mì'\\SS\on
Reoresentative Dailv Averaae Production or Iniection Data
Prior to well operation:
Subsequent to operation:
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
84 1.8 383 600 1702
371 7.7 1698 680 303
14. Attachments:
15. Well Class after proposed work:
Exploratory 0
Service D
DevelopmentŒ]
16. Well Status after proposed work: Operational Shutdown 0
OilŒ] GasD WAG 0 GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
Sundry Number or NIA if C.O. Exempt:
N/A
Copies of Logs and Surveys run-
Daily Report of Well Operations. !
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
C~
Signature
1/20104
Form 1 0-404 Revised 12/2003
Title
Production Technical Assistant
Date
RBDMS BFL
JAM 2 (::; 2004
{
(
05-28A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
08/31/03 Freeze protect tubing and flowline.
09/02/03 TIO= 440/540/120. T x IA x OA FLs for FB. TIO FLs @ surface.
09/03/03 T/I/0=440nOO/540. Load & Kill to (Secure Problem Well). MIRU Dowell Held PJSM. PT line
to 3500 psi. Start down with 10 bbl meth spear follow by 150 bbls 1 % KCL at 3 BPM for the
first 114 bbls then increased the rate to 5 bpm for the remainder of the KCL. Pumped 10 bbls
40000 LSRV FLO-PRO, 21 bbls 40000 LSRV FLO-PRO w/50 ppb zone 2 safe carb graded
CAC03 (1000#), and 10 bbls 40000 LSRV FLO-PRO spacer. Displace FLO-PRO to the perfs
with 35 bbls KCL and 38 bbls crude. Bumped pressure up to 1000 psi 3 times the pressure
would fall off to flow line pressure. Wing valve is leaking (Grease crew serviced it before the
pump job). There's 5 bbls of FLO-PRO w/CAC03 behind pipe, 5 bbls across perfs and 11
bbls above the perfs, plus 10 bbls neet FLO-PRO. R/D. Final WHP's = 560/700/540.
09/04/03 T/I/0=540/720/120. Monitor WHP's (post L & K).
09/08/03 PULL UPPER 3 1/2in ECLIPSE PATCH ASSEMBLY 281 LONG ( RUBBER ELEMENTS
LOOK GOOD) CURRENTLY SETTING UP TO PULL LOWER PATCH ASSEMBLY
09/09/03 SET 3 1/2in ECLIPSE PULLING TOOL @ 6614' SLM. MAKE 4 RUNS TO PULL. NO
MOVEMENT. LRS PUMPED TOTAL OF 68 BBLS OF DIESEL DOWN TBG. MAKE 2 MORE
RUNS W /SAME (STILL NO MOVEMENT)
09/09/03 TI0=750/725/125 Pump 68 bbls of 180* F diesel down Tbg to displace thick fluid from 6626
feet to assist S/L in fishing eclipse patch.
09/10/03 MADE SIX RUNS W/ .125 WIRE IN ATTEMPT TO PULL LOWER PACKER OF PATCH @
66151SLM APPEARED TO MOVE UP TO 6601' SLM (TOTAL JARRING TIME TODAY WAS
7 HOURS AND 35 MIN W/ .125 WIRE) -- SWITCH OVER TO BRAIDED LINE -- MAKE 1
RUN TO 6568' BLM. JAR UP FOR 2 HOURS.
09/10/03 MADE SIX RUNS W/ .125 WIRE IN ATTEMPT TO PULL LOWER PACKER OF PATCH @
6615'SLM APPEARED TO MOVE UP TO 6601' SLM (TOTAL JARRING TIME TODAY WAS
7 HOURS AND 35 MIN W/ .125 WIRE) -- SWITCH OVER TO BRAIDED LINE -- MAKE 1
RUN TO 65681 BLM. JAR UP FOR 2 HOURS.
09/11/03 PULLED LOWER PACKER OF PATCH FROM 65621 BLM ( MISSING 1 FEMALE BACKUP
RUBBER ELEMENT / 2.82 OD X 3/4in THICK LOOKS LIKE DONUT) DRIFTED DOWN AND
TAGGED DEPLOYMENT SLEEVE @ 9847 AMS / BLM W/2.7 CENT, 21 STEM, AND 3
PRONG WIRE GRAB (DID NOT RECOVER FEMALE BACKUP RUBBER ELEMENT).
09/13/03 T/I/O = 880/740/0+ temp = S/I. Tubing and IA FLs for patch. Tubing FL @ 130' (2 BBLs). IA
FL @ surface.
09/14/03 SET 3.5in ECLIPSE PATCH @ 6636-6667' TO REPAIR LEAK @ 6647'. CORRELATED TO
SWS LEAK DETECT LOG DATED 11-DEC-2002. MIN ID = 1.75in OAL = 33.76'. PATCH
CAN BE FISHED WITH 3.5in ECLIPSE RETRIEVAL TOOL IF NECESSARY.
09/20/03 CTU #5 N2 lift. RIH with 2in JSN to 65501 while pumping N2 @ 550SCF/Min. and flowing well
to system. Attempted to flow well to test separator but well was slugging hard had to be
diverted to Tiger Tank while continuing to lift w/N2 and PUH to 55001. Worked back down to
6400' ctmd and unloaded well while monitoring wc%. Could not flos well to station for test due
to slugging and system pressure, continued to flow to the tiger tank. Well lifts good from 64001
@ 550 scf/min at approx 1580 to 1890 blpd w/sample bottle water cuts of 85% to 95%.
Attempted to flow fthrough the test separator but unable to control the level.
Page 1
('
'~
~
05-28A
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
09/21/03 CTU #5 N2 lift -Continued- Flowed back -1300 to 1400 bb's water W /trace amounts of oil in
samples. No indication of formation gas at approximately 1800 bpd. Flow well to tiger tank
until! dead. Freeze protect tbg to 2500' w/crude. Freeze protect FL with 5 bbls meth & 43 bbl
crude.
FLUIDS PUMPED
BBLS
396 Crude
15 Methonal
185 1 % KCL
20 Neet Flo-Pro
21 40000 Isrv Flo-Pro 50 ppb zone 2 safr qrade Garb CaCO3 (1000#)
8650 Gal N2
50 60/40 Methonal
9337 TOTAL
Page 2
~'
(
TREE= FMC UL lRA SLIM I-DLE
WB..LHEAO = Frvc
A Crl.Ll\ TOR = BAKER C
KB. ELEV = 70'
BF. ELEV = NA.
KOP= 1300'
Max Ange = 99 @ 11613'
Datum MO = NA.
OatumTVO = 8800' SS
05-28A
SAÆTY NOTES: 4-1/2" & 3-1/2" CHROME TBG &
5-112" CHROMELNR. W ELL ANGLE > 700 @
10735' & > 90° @ 11017'.
8
2238'
4-1/2" TBG,12.6#, 13-CR.
.0152 bpf, 10 = 3.958"
10-3/4" CSG, 45.5#. J-55, 10 = 9.950"
3896'
2985'
2987'
ST ND TVO
1 3516 3140
2 5984 5119
3 7723 6473
4 8706 7211
5 9255 7601
6 9674 7918
Minimum ID = 1.75" @ 6636'
3-1/2" ECLIPSE PATCH
17-5/8"X 5-1/2" BKRLNR HGR I
1 TOP OF 2-318" LNR, 4.7#, 10 = 1.995" I
9899'
9911'
9896'
9837'
9872'
6636' - 6667'
9784'
9882'
3-1/2"lBG, 9.2#, 13-CR-80,
.0087 bpf t 10 = 2.992"
9910'
17-5/8" CSG, 29.7#, L-80, 10 = 6.875" I
10150'
. 5-1/2" LNR MILLOUT WINOOW
10565' - 10570' (OFF GMT RAMI=?
PERFORATION SUMMARY
REF LOG: SWS M8\i10RY CNLlGRlCCL ON 10/29/01
ANGLE AT TOP ÆRF: 85 @ 10835'
Note: Refer to Production DB for historical perf data
SIZE SR= INTERV A L Opn/Sqz DATE
1-11/16" 4 10835 - 11090 a 10/28/01
1-11116" 4 11350-11550 0 10/28/01
1-11/16" 4 11660 - 11745 0 10/28/01
1-11116" 4 11970 - 12085 0 10/28/01
1-11116" 4 12160 - 12185 a 10/28/01
4-1/2" OllS I-RQ SSSV NIP, 10 = 3.813"
4-1/2" X 3-1/2" XO, 10 = 2.992"
GAS LFT MA.NORELS
OEV TYÆ VLV LATCH
36 FMI-D OMY RK
37 FMI-D OMY RK
41 FMI-D OMY RK
44 FMI-D OMY RK
43 FMI-D OMY RK
40 FMI-D OMY RKP
PORT DA 1£
0 09/28102
0 09/28102
0 09/28102
0 09/28/02
0 09/28/02
0 09/28/02
3-1/2" EO-IPSE PA TCH (09/14/03),10 = 1.75"
-17-5/8" X 3-1/2" BAKERSB-3A PKR I
2.70" BKR DEPLOYMENT SL V, 10 = 2.25"
3-1/2" OllS XN NIP, MILLED TO 2.80" 10
3-1/2" WLEG (SOS)
1-1 ELMO TT LOGGBJ 09122/91 I
15-1/2" LNR, 17#, 13-CR-80, D = 4.892" I
10923'
2-3/8" LNR, 4.7#, L-80, .0039 bpf, 10 = 1.920" -î 12235' 1
DATE REV BY COMMENTS DATE REV BY COMM8\JTS
09/08191 ORIGINAL COMPLEfION 07/30/03 ??/KAK PA TCH & MIN D CORREcrlON
10/30/01 CTD SIDEfRACK 08/19/03 GMO/TLP OA TUM MO CORRECllON
07/18/01 RN/KA K CORRECllO NS 09/14/03 BJMcLlTLF ECLIPSE PATCH
11/22/02 CH/TLP CORRECllO NS 10/22/03 MJA/TLH MIN 10 CORREcrlON
09/28/02 MH/KA K GLV 00 12/28/03 JBM'PAG LNR 10 CORRECTON
05/08/03 JJ/KAK PUlL FISH
PRUDHOE BA Y UNrr
WB..L: 05-28A
ÆRMIT No: 2011950
API No: 50-029-22208-01
SEC32, T11N, R15E, 2431' SNL& 4220' WEL
BP Exploration (Alaska)
) \\ rJ ~ \j ;{,o~} ~
DATA SUBMITTAL COMPLIANCE REPORT
10/22/2003
SflY..L t It ttJ~~ (
API No. 50-029-22208-01-00
Permit to Drill 2011950
Well Name/No. PRUDHOE BAY UNIT 05-28A
Operator BP EXPLORATION (ALASKA) INC
MD
12235 ..-
Completion Date 10/30/2001 ,.--
1-01L
Current Status 1-01L
UIC N
Completion Status
TVD
8791 "...-
----
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey
~ 'f~ ,
DATA INFORMATION
(data taken from Logs Portion of Master Well Data Maint)
Types Electric or Other Logs Run:
Well Log Information:
--~,
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
~/ Pressure
1k69
jftD C
I
t;o
~~~
I
Log Log Run Interval
Scale Media No Start Stop
1 Blu 1 20 9450
1 Blu 1 20 9450
1 9730
1 20
1 10468
1 20
1 10468
1 20
Case 12/20/2002 t> 1-
Gradiometer
A567 Neutron
OH/
CH Received Comments
Case 12/20/2002 ~ ¡..-
Case 12/20/2002 ~ v
12190 Case 1217/2001
9450 Case 12/20/2002" L-
Spinner
Blu
1
~ ' /1'0724
12235 Open 4/4/2002
Blu
9450
Case 12/20/2002 'D t..-
1
D
~58
11970 Open 4/18/2002
1
Blu
9450
Well Cores/Samples Information:
Name
InterVal
Start Stop
Sample
Set
Number Comments
~~-~"
Sent
Received
ADDITIONAL INFORMATION
Well Cored? Y / N
Chips Received?
Analysis
Received?
Daily History Received?
Y/N
@N
Y/N
Formation Tops
Y/N
Comments: ¡V,(j r- ,'^- 1\ t1 b vV\..(
M. ú/J c.-- 2. It ~ r1:;- ~ l .s; i J "'^- I ß L--
(J) a... MD ¿IU ~ t=.'1 "-./ 13 L-
ú> 1'1... MJJ $ Iv Da tßJ ~~L / f\.o.-! ß L--
DATA SUBMITTAL COMPLIANCE REPORT
1 0/22/2003
Permit to Drill 2011950
Well Name/No. PRUDHOE BAY UNIT 05-28A
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-22208-01-00
Compliance Reviewed By:
~Pletion Date 10/30/2001
Completion Status
1-01L
Current Status 1-01L UIC N
Date: ~ ttJ (} 1/ ~)-
MD
12235
ND 8791
~"'...
-",
1 0/31/03
Scblumbepgep
NO. 3017
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Well
Job#
Log Description
Date
Blueline
Color
Prints
.-=-~~,
CD
H-19B ~ ~ ~ ....{"þ, lJ MEM PPROF & IPROF LOG 09/29/03 1
H-27A ð~~ -('~J.~ Of MEM PPROF & IPROF LOG 10/01/07 1
D.S. 1-10 J '7¡.p:;-~ 1-.1 ~ PSP LDL 10/25/03 1
0.5.15-23 . q t - ~ ~ RST GRAVEL PACK LOG 07/10/03 1
JX-O2A ¡\..' '- '- 1 c:.,~ LDL 07/18/03 1
0.5. 14-23 ~ ,;; ,-{ YX ~ PSP LDL 10/24/03 1
P1-17 ...." -::~ -("),Þ') ( PROD PROFILE WIDEFT/GHOST 10/26/03 1
D.S. 4-42 Ie - L..l-<" LDL 10/22/03 1
GNI-02 \ (". .;; ~,."')/~.r~ TEMP PROFILElSBHP SURVEY 10/08/03 1
D.S.6-16 i r- -ê)~~ LDL 10/12/07 1
P1-18A t- """~ -n Tt"o PROD PROFILE WIDEFT 10/15/07 1
D.S.5-28A r ..... tÖ t:=- LDL 10/14/03 1
D.S. 12-20 l5;!Q -ICï LDL 10/21/03 1
2-32/SN-O3 l '-t () '" I 9 LDL 10/25/07 1
Z-39 ~-(""\ h< 10563105 RST-SIGMA 09/22/03 1 1J~~x
..-...~
-
-~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center lR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
f~~. L~: (:: F i 'J t= 0
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Date Delivered:
NOV 0:3 ?OC-:j
Received b~- ~
.~;V'\ C .
\ C"\ ~ f1' /Vî
,
;':,¡G~;~ð J;¡ Ù C~~~~ ;~cn~.j:Jmm!S~Oíi
AnC110n:~ge
~\)ÿ\~~
(
WELL LOG
TRANSMITTAL
~Ol' tQS
(
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7lhStreet
Suite # 700
Anchorage. Alaska 99501
RE:
Distribution - Final Print( s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of :
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 1369
Stafford, TX 77497
BP Exploration (Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
LOG DIGITAL MYLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT(S) OR
CD-ROM FILM COLOR
Open Hole 1 1 1
Res. Eva!. CH 1 1 1
05-28 08-30-03 Mech. CH J ~!;j-g
,
Caliper Survey
Signed:
~,
""""'- """
~f3')\ ~I",,~ ,"_CJ ~~ ç'~
s:~
\~\
Date:
Print Name:
0,.,.-,- (\ ", ","'¡'\,'.,
/' ".., .'
'\",1 ""~.iL.'"
Ij,;di.,;~;:;~
;,.L '
" ':"~'¡':,'~:I¡(\¡"li
"i j,\(",;ß ',.,,'
PRoAcTivE DiAGNOSTic SERvicES, INC., PO Box 1 }b9 STAffoRd IX 77477
Phone:(281) 565-9085 Fax:(281) 565-1369
E-mail: pds@memorylog.com
Website: www.memorylog.com
"'.\~~~ 'Y\ ~
('
WELL LOG
TRANSMITT AL
ð-O\ -- \ C(5
(
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7tnStreet
Suite # 700
Anchorage. Alaska 99501
RE:
Distribution - Final Print(s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of :
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 1369
Stafford, TX 77497
BP Exploration (Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
LOG DIGITAL MYLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT(S) OR
CD-ROM FILM COLOR
Open Hole 1 1 1
Res. Eva!. CH 1 1 1
Os 05-28 8-23-03 Mech. CH 1
j ~ 1-1""13
Caliper Survey
Signed:
"",,"0 """ "'"
--"'-'~ ~ ~,\ \..V~ \~ \" 9- ~ ~ ~ /~~
f:
',j
!',;
"ce". !:":'-",¡,
::1 t"
fl"""d"
Date:
Print Name:
O"""-i'J"',¡',""",~"J,
, :' ¡ . I" \ I'" ')', ':' '"
.l i:,... , ,) £.." 'j ,.) ',i
':"'t"":'"i,¡";!"\,ìr""¡"',,~'
.,..','",,;,. ":IJ,)ì,;\ti~J\i
PRoAcTivE DiAGNOSTic SERVicES, INC., PO Box 1 }b9 STAffoRd TX 77477
Phone:(281) 565-9085 Fax:(281) 565-1369
E-mail: pds@memorylog.com
Website: www.memorylog.com
\'
"'\~~\~ ~\ ~
Sc~IUllbe,gep
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Well
D.S. 5-28A
L 1-15
GNI-03
NK-62
4-08/P-27
2-62/Q-17
2-321SN-03
D-13A
1-57/R-23
Job#
Log Description
23402
-
23281
LDL
RST-GRAVEL PACK
SHUT-IN TEMP SURVEY
PROD PROFILE/DEFT
INJECTION PROFILE
LDL
ill
MCNL
RST -SIGMA
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
CE\\JED
AI 1;-- r." t);,,';
, 'i" .'" ¡ "',
. .J\J L, L'_")'.~'
\,..'.
~ ""-- --
~
fÚ.rSKft
, ..
~ú¡nr¡¡¡a~on
!-,¡nj¡Dn~gø
Date
08/17/03
08/20/03
08/18/03
05/30/03
08/20/03
08/17/03
08/18/03
06/23/03
05/07/03
Blueline
NO. 2952
Company:
08/27/03
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Prints
1
1
1
1
1
1
1
1
1
~
CD
1
1
.
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Received ~ C\.)..IU~~ 0 ~
12/18/02
Schlumbepgep
NO. 2625
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TIN: Beth
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
-"",
Well
Job#
Log Description
Date
Blueline
Sepia
Color
Prints
CD
D.S. 15-27 1'1;) - OOcQ LEAK DETECTION LOG 12/08/02 1
D.S. 7-09 i ,'1-0 ttn LEAK DETECTION LOG 12/12/02 1
D.S. 5-28A --=-- n,- J C 5 LEAK DETECTION LOG 12/11/02 1
D.S. 16-20 I :í~ -:J~ ~S PRODUCTION PROFILE 12/04/02 1
W-37 A .~~ - J4v 22532 MCNL 12/04102 1 1
W-37A 22531 ARC3 DATA 11/02/02 1
W-37A 22531 MD VISION RESISTIVITY 11/02/02 1
W-37A ...... / 22531 TVD VISION RESISTIVITY 11/02/02 1
--.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
D'C 2 {\ r:(\f¡?
r:.. ...J Lvv,-
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATIN: Beth
D~.=C' -i,"".ï::.""""'O"
- ,< ~ - ~ ;t I
¡j '\~ -!rik-~ ~ ~:i
Date Delivered:
it! ~~ -,,:¿;;:, f~'.r,.~ {"t. 0'." '-.-mlml'<tetU\n
¡..:..:a.,;.:->.a Vi. ;... \;Jç¡;:¡ yOh~. \..-\,;í uu vglYU
An ch crag e
("
(
llomHs.,.nm»lI-¡
, ""',,"',.,,'" ,
-----...-------..,-"...."'.,......,
'?'F~;~:':::"'...-
, " ,
t~"~r""~: ., ~,
To: State of Alaska, Alaska Oil & Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
,~~.~ ~" ',....
:-~...~ :;",;'"- ¡ ~ i.: 'it,
¡ ¡ H~î
~ ~ i~ E
Canada GEOSciences Centre" j ¡ H ~¡,
_."'~ ~ ¡ ~:~~,
¡ j !H~:
~ : ~~ :, =:
, : ì:S::
~ ; ¡hï:
~. = :~i
"""~. ~ I if ~ ii'
i ; ~n!,
¡ ¡ jHi¡
1 ;. i~ W .
~ , ~. ..,
¡ ¡ !Hì¡
i ; ~H~I
1 : ~~ ;1:
_w"'-, ! . ,'=¡
~ : ;p.
! ~ ~~ Ui
\ : jX ,tll
! ¡ ~~,: ~~l
! ¡ æH~1
! 1 i~ ~~:
,~~. ~: ':.::: I
:::". ~ ,~. '!i ¡
§LiE$ ,.: 'I
:::-"'_"'~;:':;:"~;': "::""'::'[
II a, "...-;".. '~~h_!;::%;: ':--:.:
, ",,'.,,'
,-. ..... u ., -.
BAKER
HUGHES
Transmittal Form
Baker Atlas
Attention: Lisa Weepie
Reference: BP Exploration, Inc. 18-32A Prudhoe Bay Unit~O)-IO1
BP Exploration, Inc. H-07 A Prudhoe Bay Unit du o-/à '6
BP Exploration, Inc,15"'41~:pBll:)l1.ldhQ~,BayUnit aOj',-Jcl L.ç;
BP Exploration, Inc.4..41.Â]IJB~f>rnçll1()e'BélyUnìt~QQ-L0¡5
BP Exploration, Inc.O51~~B' ,PrUdhQ~]3ây:UnitQO)"'I"~O
BP Exploration, Inc. 05-28A 'PrudhoeE3a.yUnitaOI-Icq5
.', ,. ..-. .
,. . ..
..- " ....
. .. .-. . n- .
.. , ..
Contains the following For EaçhOfThe Above Wells:
¡
, iLJ',',',"'-,""',",','
: II ' " '¡
, ,
i",~ !
r .,. - '. :..:....:...':'.-:" -:-:::.:..:...:.:J
1 - LAS Fonnat disk
','~"',.",]j'l "..", ,
;!"'ll4':YlffiS,",': ',",' . ",' ",',:",",'" "',"',",'
t îi,;r~~~ W~~~.~J,} pp~r
. ."," .....'. ,_.. ...-
---_..-- --- --- -- --
-- ---_.-
---- ,---------
~~"'-"",,::,,-
----.- ._--- ---.------..
,,----- ._----.----,-_.
--- .-.
--- -.. - ,.....- --- - --" .
. .. ." . .
-------' --..".------
,-'
~:"'::':"'::."-"n__......._':_,
:, ~'." ,...:>. -....
~)::;>=~ ~7 -:-~::===
r':-cro-- .. -'-.------:-
'::.J :':' :. .-":,-.., :.'.
:-i:"-:-:-- :~-~7.-:-:-',--:-:---
! .~::.... I. -..: :"'..:.:::::'. "'.
:_,....,:- . .._--._---~..._-_..
.':' '.' ::': : ;.,,:: :,,: :
- .. . .' '.'"
,./'::.. í, : ) '.'
---- .----.,-
-.----:-- :--:--.,,:----
......-... . -
:'.~'l:"::::" :=.:::::.::..:~-~::~:
RECEIVED ~¿: : ..:-;/~:~=
Date: :-:_~~~-:: ¡ :.~~===::-:-},-:::=
L':J' ~ ~~,~~~
. .: ~ \ 0 . r LOO2 ~i~~ ;_~n"__.':~f(::
PLEASE ACKNOWLEDGE RECEIPT BY SIGNIN~.(fIJd&\~]j~&ftissiÓn~"': "~~::-7'.n.:
OR FAXING YOUR COpy Anchorage fi!:.;:~'~i::i:¡j¡ ,,',
FAX: (403) 537-3767 t~:~,!.:,'.:;~i:,;¡:',ll,:",,:
~-_:::,.!::,!._, ~,""":',i
~-"~~--' ~
Sent By: Josef Berg
Received By: è~ ~~1
Date: Aprill, 2002
:-:-:::-:::-:-.: . -- -..--.. _:.... ....,
;~ :~.~~
".'-- '-'----
Baker Atlas
#1300, 401-9th Ave. S.W,
Calgary, Albert a, Canada
T2P 3C5
Direct: (403) 537-3752
FAX: (403) 537-3767
;:....:::.,.,~:,,~-~-~..:/;.::.i:~
':::::;~;'~~j
¡
;
i..,...
r
!
- .-"
12/05/01
ScblllDbepger
NO. 1663
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Aftn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay,Niakuk
.~
""-"
Well
Job #
Log Description
Date
Blueline
Sepia
Color
Prints
CD
~.
D.S.11-35 ICKl---oloS INJECTION PROFILE 11/22/01 1 1
N-17 /q~ -- CO9 21460 RST-SIGMA 10/23/01 1 1 1
D.S. 1-Ð3A I ( , c:. - ;;;,)oll 21194 RST -SIGMA 04/05/01 1 1 1
D.S. 5-28A a ~ 1- q S 21470 MCNL 10/29/01 1 1 1
D.S.11-37 141.0 -/ít.j 21481 RST-SIGMA 11/09/01 1 1 1
D.S.15-32A ,..::}f")I- /Q'L/ 21479 MCNL 11/07/01 1 1 1
D.S.15-44 I qiD - 110 21469 RST-SIGMA 10/25/01 1 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc,
Petrotectnical Data Center LR2- 1
900 E. Benson Blvd.
Anchorage. Alaska 99508
RECEIVED
Schlumberger GeoQuest
3940 Arctic Blvd. Suite 300
Anchorage. AK 99503-5711
ATTN: Sherrie
Received b~ ( ~
Date Delivered:
DFC 0 7 2001
. . a
.
Anchorage
(' STATE OF ALASKA ('
ALASKA OIL AND GAS CONSERVATION COMMI~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
IHI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-195
3. Address 8. API Number
P.O. Box 196612, Anchorage, Alaska ... 50- 029-22208-01
99519-6612 '¡DCA'" ,"
4. Location of well at surface :------- '" "', ',--, Vè 9. Unit or Lease Name
2431' SNL, 4220' WEL, SEC. 32, T11 N, R15E, UM -i: ," C',~i ' ' ,
.'-'J-i .:'~~ '1;;, Prudhoe Bay Unit
At top of productive interval " ~...u~
: J~3l:~Ç¿t f.:¡; ,'- ,
3039' NSL, 5000' WEL, SEC. 29, T11 N, R15E, UM ;, D., . '-"",?4..~",,( 1 O. Well Number
At total depth i ---~.Ab.._.__", ~"~"_~-,~,---"",-""
05-28A
43201 NSL, 553' WEL, SEC. 30, T11 N, R15E, UM
.. - , """c-,-----.- 11. Field and Pool
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool
RKB = 70' ADL 028326
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 15. Water depth, if offshore 16. No. of Completions
10/19/2001 10/27/2001 10/30/2001 N/ A MSL One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost
12235 8791 FT 12198 8790 FT IHI Yes ONo (Nipple) 2238' MD 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, Memory CNl, CCl
23. CASING. LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 110' 30" 11 Yards Arcticset
10-3/4" 47# J-55 Surface 3916' 13-1/2" 1265 sx CS III, 350 sx 'G', Top Job: 90 sx CS II
7-5/8" 29# l-80 Surface 10150' 9-7/8" 815 sx Class 'GI
5-1/2" 17# 13Cr80 9837' 10565' 6-3/4" 95 sx Class 'G'
2-3/8" 4;7# l-80 9872' 12235' 3" 113 sx Class 'G'
24. Perforations open to Production (MD+ TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
1.56" Gun Diameter, 4 spf 4-1/2", 12.6#, 13Cr80 2987'
MD TVD MD TVD 3-1/2",9.2#, 13Cr80 9911' 9784'
10835' - 110901 8805' - 88091 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
113501 - 11550' 8812' - 88091
11660' - 11745' 8796' - 87941 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
119701 - 12085' 8794' - 8784' 2000' Freeze Protected with MeOH
121601 - 121851 8787' - 8789'
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
November 7, 2001 Flowing
Date of Test Hours Tested PRODUCTION FOR OIL-BBl GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED Oll-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CaRR)
Press. 24-HoUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit conFt~~CEIVED
DEC 0 6 fOOt
Alaska Oil & Gas Coos. Commission
Anchorage
Form 10-407 Rev. 07-01-80
0 R \ G \ NA l}BDMS BFl
DEC I n 2001
Submit In Duplicate
~~
(
(
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GaR, and time of each phase.
21TS
10614'
87191
Zone 1 B
10580'
86941
Base of Sadlerochit
11 000'
88131
R.ECEIVED
DEC 0 (; 2001
Alaska Oil & Gas Cons. Commission
Anchorage
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the fore oing is true and correct to the best of my knowledge
Signed Terrie Hubble Title Technical Assistant
Date \~"CJb.D
05-28A
Well Number
201-195
Permit No. / A roval No.
Prepared By Name/Number:
Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'nonel.
Form 10-407 Rev. 07-01-80
OR\G\NAL
('
(,
BP EXPLORATION Page 1 of 10
Operations Summary Report
Legal Well Name: 05-28
Common Well Name: 05-28A Spud Date: 10/17/2001
Event Name: REENTER+COMPLETE Start: 10/17/2001 End:
Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/17/2001 07:00 - 09:30 2.50 RIGU P PRE Move rig from 5-23 and spot over 5-28A. Lay berm and spot
cuttings tank and tiger tank.
09:30 - 11 :30 2.00 BOPSUF P DECOMP ACCEPT RIG ON DS 5-28A AT 09:30 HRS ON 10/17/2001.
NU BOPE.
11 :30 - 18:30 7.00 BOPSUF P DECOMP Test BOP and associated equipment to 300/3500 psi. Test
witnessed by AOGCC Rep Lou Grimaldi.
18:30 - 20:15 1.75 STWHIP P WEXIT C/O CT packoff. Weld on new CTC.
20:15-21:00 0.75 STWHIP P WEXIT M/U BHA #1. 1.75 deg motor, used parabolic 2.79" diamond
mill for pilot hole
21 :00 - 23:40 2.67 STWHIP P WEXIT RIH. Shallow test tools at 2000 ft. RIH.
23:40 - 00:00 0.33 STWHIP P WEXIT Tag XN nipple at 9898 ft. Correct to 9900 ft. [+2 ft CTD].
Mill out XN Nipple with very light WOB. 500# WOB. 1.6 BPM,
1800psi.
10/18/2001 00:00 - 01 :00 1.00 STWHIP P WEXIT Mill out XN nipple at 9900 ft with 2.79" mill. Very light WOB.
Back ream and ream down.
01:00 - 02:10 1.17 STWHIP P WEXIT Tied-in with GR to BHCS/GR at 10375 ft. [-13 FT CTD].
02:10 - 02:30 0.33 STWHIP P WEXIT Orient TF to 130R. RIH and tag cement top at 10,480 ft.
02:30 - 05:30 3.00 STWHIP P WEXIT Mill Pilot hole in cement at 130R TF. ROP = 30 FPH. 1700 #
WOB. 1.8 bpm.
Mill Pilot hole to 10559 ft.
05:30 - 05:45 0.25 STWHIP P WEXIT Orient TF to 60L
05:45 - 06: 15 0.50 STWHIP P WEXIT . Mill ramp at 60L. Hard cement, 25 FPH. Mill ramp to 10,565
ft.
Flag CT at 10,400 ft EOP.
06:15 - 08:15 2.00 STWHIP P WEXIT POOH for 2.5 deg fixed bend motor and 2.80" new diamond
window mill.
08:15 -10:30 2.25 STWHIP P WEXIT RIH with window milling BHA #2.
10:30 -11:15 0.75 STWHIP P WEXIT Tie-in with GR, ( flag, -6' ) ( gamma +3' ) ( -3' net correction on
CTD)
11:15-11:30 0.25 STWHIP P WEXIT Orient TF to 13L. Tag up at 10565'. Flag pipe. PUH 11. \
11 :30 - 19:20 7.83 STWHIP P WEXIT Start time milling window at 10564' at 11 :30 hrs. 1.8/1.8 bpm. ~
2500 psi. 20L.
At 10565' at 16:03 hrs.
At 10566' at 19:19 hrs. 1.7/1.7 bpm. 2560 psi. TF 348 deg.
19:20 - 22:10 2.83 STWHIP P WEXIT ,Cont milling window per schedule.
,At 10567' at 21 :02 hrs. 1.7/1.7 bpm. 2780 psi. TF 336 deg.
At 10568' at 22:10 hrs. 1.7/1.7 bpm 2750 psi. TF 326 deg.
22:10 - 23:00 0.83 STWHIP P WEXIT Incr milling speed. Incr pressure to 2850 psi & WOB to 5000#.
Cont milling down to 10569.5 ft. Bottom of window.
Window = 10,565 - 10,569.5 ft.
23:00 - 00:00 1.00 STWHIP P WEXIT .. Mill formation at 10 fph from 10569.5 ft to 10,573 ft. Slow
ROP.
10/19/2001 00:00 - 01 :00 1.00 STWHIP P WEXIT Mill formation to 10,580 ft. 60L TF. Flag CT at 10,400 ft EOP.
01 :00 - 02:45 1.75 STWHIP P WEXIT POOH for taper mill to dress window.
02:45 - 03:30 0.75 STWHIP P WEXIT M/U 1.75 deg motor and 2.78" taper mill. C/O batteries.
Window mill out of hole at 2.80" gauge.
03:30 - 06:00 2.50 STWHIP P WEXIT RIH with BHA #3. Shallow test. RIH.
06:00 - 06:30 0.50 STWHIP P WEXIT Tied-in with BHCS/GR, [-3 ft CTD.]
06:30 - 07:30 1.00 STWHIP P WEXIT Orient TF to 30L. Work mill down thru window & work thru
same. Had 3 stalls attempting to get through then able to mill
down at 30-40 fph and exit window.
07:30 - 08:30 1.00 STWHIP P WEXIT Run thru window and clean out open hole to confirm out of
window - OK. Make 3 back reaming passes at TF 30-60L.
\
Printed: 11/5/2001 10:48:46 AM
(
(
BP EXPLORATION Page 2 of 10
Operations Summary Report
Legal Well Name: 05-28
Common Well Name: 05-28A Spud Date: 10/17/2001
Event Name: REENTER+COMPLETE Start: 10/17/2001 End:
Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/19/2001 08:30 - 09:45 1.25 STWHIP P WEXIT Make 3 backreaming passes at approx 0 TF while starting to
displace well to Flo-Pro. Continue with 3 passes at TF 30L.
Make dry pass thru window - OK. Get Flo Pro around.
09:45 - 11: 15 1.50 STWHIP P WEXIT POH to PU drilling build BHA #4.
11: 15 - 11 :45 0.50 STWHIP P WEXIT Stand back injector. LD BHA #3. Mill OD worn down approx
0.01 inch to 2.77".
11 :45 - 12: 15 0.50 DRILL P PROD1 MU build BHA #4 with DPI 2.71IX3" SR933 bi-centre bit and 1.5
deg motor. MU injector.
12:15 -12:30 0.25 DRILL P PROD1 RIH. Shallow hole test MWD at 1000' - OK.
12:30 -14:35 2.08 DRILL P PROD1 Cont RIH with BHA #4 to 10459'. Correct to EOP flag at 10400'
(-6').
14:35-15:15 0.67 DRILL P PROD1 PUH & tie in to GR. GR sensor has locked up giving constant
reading of 24 units only. Tool failure. Tool was giving GR
readings during SHT.
15:15 -16:45 1.50 DRILL N DFAL PROD1 POH to change out GR probe #1.
16:45 - 17:45 1.00 DRILL N DFAL PROD1 Pull MWD package and swap GR probes. Surface test new
system - OK.
17:45 - 20:30 2.75 DRILL N DFAL PROD1 RIH with build BHA #5 & bit #4 RR1 wI GR probe #2. Shallow
test tools OK. RIH.
20:30 - 23:00 2.50 DRILL N DFAL PROD1 Log tie-in with GR. BHI computer problems, change out
computers.
tied-in with GR. [-2 ft CTD].
23:00 - 23:30 0.50 DRILL N DFAL PROD1 Orient TF.
23:30 - 00:00 0.50 DRILL P PROD1 Drilling. TF = 50L, 1.7 bpm, 3100 psi. full returns. Drilled to
10,585 ft wlo GR signal. GR failed at very start of drilling.
10/20/2001 00:00 - 03:30 3.50 DRILL P PROD1 Drilling, TF = 40L, 1.7 bpm, 3100 psi, drilled to 10662 ft.
Drilled ahead on first 80 ft of build section with no GR signal
from BHI MWD. No back up tools presently available.
03:30 - 05:30 2.00 DRILL N DFAL PROD1 POOH to repair MWD tools. No GR signal. (GR Probe #2)
05:30 - 07:30 2.00 DRILL N DFAL PROD1 UO MWD tools. Check motor and bit. MU new directional
package & check out GR probe #2. Tool checks out and no
replacements on Slope (ETA 13:00 hrs today). MU BHA wI GR
#2 probe. MU injector.
07:30 - 08:00 0.50 DRILL N DFAL PROD1 RIH & SHT tools at 1000'. No signal or readings from GR
probe.
Cycle pump - still no readings.
08:00 - 08:15 0.25 DRILL N DFAL PROD1 POH.
08:15 -12:00 3.75 DRILL N DFAL PROD1 Stand back injector. Troubleshoot MWD package. Try different
probe configuration. No success. ETA for replacement GR
package now 13:30 hrs via NAC cargo flight.
Discovered indication of short in bottom GR connector not field
repairable.
12:00 -15:30 3.50 DRILL N DFAL PROD1 Wait on replacement GR probe to arrive. General rig
maintenance.
15:30 -16:00 0.50 DRILL N DFAL PROD1 MU and surface test new GR probe #3. MU BHA #6 w/DPI
bi-centre bit 4 RR2 and 2.6 deg motor.
16:00-18:15 2.25 DRILL N DFAL PROD1 RIH wI BHA #6. Shallow hole test at 1000' - OK. All checked
out with new probe. Ran extra I long shallow test. OK. Correct
at 10400' EOP flag (-8.7').
18:15 -19:00 0.75 DRILL N DFAL PROD1 Attempt to Tie in wI GR. Again no signal from GR probe.
Unable to get signal.
19:00 - 20:30 1.50 DRILL N DFAL PROD1 POOH with failed GR probe #3. Shallow test at 2800 ft. GR
not working.
Printed: 11/5/2001 10:48:46 AM
(
('
BP EXPLORATION Page 3 of 10
Operations Summary Report
Legal Well Name: 05-28
Common Well Name: 05-28A Spud Date: 10/17/2001
Event Name: REENTER+COMPLETE Start: 10/17/2001 End:
Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/20/2001 19:00 - 20:30 1.50 DRILL N DFAL PROD1 GR probe history: #1 probe failed at TD but works on bench.
#2 probe had a shorted wire connection
#3 probe being pulled now
#4 probe on flight from Anc at 2130 hrs.
tonight
20:30 - 22:15 1.75 DRILL N DFAL PROD1 C/O motor, bit and GR module. Left out MWD memory
module, to see if it was affecting MWD signal. RIH with #4 GR
probe.
22:15-00:00 1.75 DRILL N DFAL PROD1 RIH with BHA #7 & GR probe #4, 2.60 deg motor and new DPI
bi-center bit #5.
10/21/2001 00:00 - 00:30 0.50 DRILL N DFAL PROD1 RIH with MWD BHA #7, GR probe #4 with 2.60 deg motor and
bi-center bit.
00:30 - 01 :00 0.50 DRILL N DFAL PROD1 Tied-in with GR to BHCS/GR. [-13 ft CTD].
01 :00 - 02:30 1.50 DRILL N DFAL PROD1 Log MAD pass of GR from 10645 - 10565 ft.
02:30 - 03:00 0.50 DRILL N DFAL PROD1 Orient TF.
03:00 - 05:00 2.00 DRILL P PROD1 Drilling, TF = 10L, 1.7 bpm, 3050 psi, full returns, Drilled to
10,735 ft.
05:00 - 05:45 0.75 DRILL P PROD1 Drilling, TF = 5L, 1.6 bpm, 3000 psi, full returns, Drilled to
10,773 ft.
Finished build section.
05:45 - 07:30 1.75 DRILL P PROD1 POOH for lateral section.
07:30 - 08:00 0.50 DRILL P PROD1 Stand back injector. LD BHA #7. CO bit, adjust motor bend to
0.79 deg. MU same. Stab injector.
08:00 -10:15 2.25 DRILL P PROD1 RIH with BHA #8 - HTC STR WD bi centre bit #6, 0.79 deg
motor. Shallow hole test at 1000' - OK. Cont RIH. Slight mud
loss during trip in - approx 4 bbl/hr RIH at 90 fpm. Correct to
EOP flag at 10300' EOP (-11').
10: 15 - 11 :00 0.75 DRILL P PROD1 Log GR tie-in at 10375'. (Corr'n 0').
11 :00 - 11 :45 0.75 DRILL P PROD1 RIH & thru window, no circ - no problem. RIH to 10773'. PUH
and get clicks for 70-80L.
11:45 -13:30 1.75 DRILL P PROD1 Drill ahead:
10815'. 1.6/1.6 bpm 3400 psi. TF 77L. 50-60 fph ROP.
Losses at zero since starting to drill ahead.
Drill to 10860'. Starting to stack wt.
13:30 -13:45 0.25 DRILL P PROD1 100' short trip & back to bottom.
13:45 -15:20 1.58 DRILL P PROD1 Cont drilling ahead & land well at 8738' ss in Z1 a.
10910': 1.6/1.6 bpm. 3450 psi. TF 80L. 70-80 fph ROP.
15:20 - 15:40 0.33 DRILL P PROD1 Wiper trip to window to clean up hole - still stacking out when
drilling.
15:40 - 16:45 1.08 DRILL P PROD1 Cont drilling ahead - wt transfer improved.
Drill down to 10942'. Continue with wt transfer difficulties.
16:45 - 17:00 0.25 DRILL P PROD1 Pump 25 bbl new mud from pill pit while PUH slow. RIH to btm.
17:00 - 18:00 1.00 DRILL P PROD1 Start drilling again once new mud outside pipe. ROP increase
to 100+ fph.
Drill ahead to 10980'. Get 2 clicks.
11000': 1.7/1.7 bpm. 3450 psi. TF 32 deg L. ROP 70 fph.
18:00 -19:10 1.17 DRILL P PROD1 Drilling, TF = 90R, 1.6 bpm, 3000 psi, 90 deg incl. Drilled to
11 030 ft.
19:10 - 20:00 0.83 DRILL P PROD1 Wiper trip to window.
20:00 - 21 :00 1.00 DRILL P PROD1 Drilling, TF = 80R, 1.6 bpm, 3000 psi, 92 deg incl. Drilled to
11,078 ft.
21:00-21:15 0.25 DRILL P PROD1 SAFETY. FIRE DRILL IN BOILER ROOM. Personnel
Printed: 11/5/2001 10:48:46 AM
(
(
.-
BP EXPLORATION Page 4 of 10
Operations Summary Report
Legal Well Name: 05-28
Common Well Name: 05-28A Spud Date: 10/17/2001
Event Name: REENTER+COMPLETE Start: 10/17/2001 End:
Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/21/2001 21:00-21:15 0.25 DRILL P PROD1 responded to boiler room.
21:15-23:50 2.58 DRILL P PROD1 Drilling, TF = 160R, 1.6 bpm, 3000 psi, 93 deg incl. Drilled
to 11,179 ft.
23:50 - 00:00 0.17 DRILL P PROD1 Wiper trip to window.
10/22/2001 00:00 - 00:15 0.25 DRILL P PROD1 Wiper trip to window.
00:15 - 00:45 0.50 DRILL P PROD1 Tied-in with GR. [+1 ft CTD].
00:45 - 01 :15 0.50 DRILL P PROD1 RIH to TD.
01:15 - 02:00 0.75 DRILL P PROD1 Orient TF
02:00 - 05:30 3.50 DRILL P PROD1 Drilling, Try to hold 88 deg incl. to stay in target Zone 1A sand.
Swapped to new FloPro Lite mud. Stored old mud at MI plant
for mud losses.
1.6/ 1.6 BPM, 3000 PSI, TF = 90R. Drilled to 11,294 ft.
05:30 - 06:30 1.00 DRILL P PROD1 Wiper trip to window. Clean hole.
06:30 - 08:45 2.25 DRILL P PROD1 Drill ahead:
113601: 1.6/1.6 BPM. TF 85L. ROP 90 FPH. Drill ahead to
11409'.
08:45 - 10:00 1.25 DRILL P PROD1 Wiper trip to window to clean up hole & improve wt transfer.
10:00 -10:30 0.50 DRILL P PROD1 Drill ahead to 11445'.
10:30 - 11: 15 0.75 DRILL P PROD1 Orient around for TF 90R.
11: 15 - 12:40 1.42 DRILL P PROD1 Drill ahead to 11543'.
12:40 -13:00 0.33 DRILL P PROD1 300' wiper trip.
13:00 -14:00 1.00 DRILL P PROD1 Drill ahead to 11605'. 1.8/1.8 bpm. 3350 psi. TF 155L.
In graben and should be in 21 b or possibly upper 21a.
14:00 -15:30 1.50 DRILL P PROD1 Wiper trip to window & back to bottom.
15:30 -16:45 1.25 DRILL P PROD1 Drill ahead to 11685' trying to get angle down with 180 deg TF.
Crossed fault #2 at 11618' est.
16:45 -17:30 0.75 DRILL P PROD1 Get clicks for 90-1 OOR.
17:30 -18:15 0.75 DRILL P PROD1 Drill ahead to 11703'.
18:15 -19:00 0.75 DRILL P PROD1 Orient around to 70-90R.
19:00 - 20:50 1.83 DRILL P PROD1 Drilling, TF = 85R, 1.6/1.6 bpm, 3100 psi. 86 deg incl.
Drilled to 11737 ft.
20:50 - 21 :30 0.67 DRILL P PROD1 Wiper trip to window.
21 :30 - 22:30 1.00 DRILL P PROD1 Log tie-in. Added 4 ft CTD.
22:30 - 23:15 0.75 DRILL N RREP PROD1 Test Generator #1 under various loads to determine cause of
generator kick-out problem.
23:15 - 23:45 0.50 DRILL P PROD1 RIH to TO.
23:45 - 00:00 0.25 DRILL P PROD1 Orient TF.
10/23/2001 00:00 - 00:30 0.50 DRILL P PROD1 Orient TF.
00:30 - 03:00 2.50 DRILL P PROD1 Drilling, TF = 90R, 1.6/1.6 bpm, 3100 psi, 88 deg incl.
Drilled to 11,800 ft.
03:00 - 04:30 1.50 DRILL P PROD1 Drilling, TF = 11 OR, 1.6/ 1.6 bpm, 3100 psi, 89 deg incl.
Drilled to 11,827 ft.
04:30 - 05:45 1.25 DRILL P PROD1 Wiper trip to window. Hole was clean.
05:45 - 08:45 3.00 DRILL P PROD1 Drilling, TF = 140R, 1.6/1.6 bpm, 3100 psi, 88 deg incl.
Drilled to 11873 ft.
Still in shale.
08:45 - 10:30 1.75 DRILL P PROD1 Orient straight up & attempt to come back up out of shale.
Geologists working on plan forward. Drill ahead to 11915'.
10:30 - 11 :50 1.33 DRILL P PROD1 Orient around for 90R and drill ahead. Project 92 deg at bit at
11920' MD.
1.7/1.7 BPM. 3700 psi. 22 fph ROP. Drilled to 11945 ft.
11 :50 - 13:30 1.67 DRILL P PROD1 Wiper trip to window. Hole was clean.
Printed: 11/5/2001 10:48:46 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/23/2001
10/24/2001
((
('
BP EXPLORATION
Operations Summary Report
05-28
05-28A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From - To Hours Activity Code NPT
13:30 - 14:00
14:00 - 15:30
15:30 - 18:00
18:00 - 19:30
19:30 - 22:00
22:00 - 22:30
22:30 - 23:00
23:00 - 23:30
23:30 - 23:45
23:45 - 00:00
00:00 - 01:15
01:15-03:15
03:15 - 05:15
05:15 - 06:00
06:00 - 07:25
07:25 - 08:20
08:20 - 09:00
09:00 - 10:20
10:20 - 11 :50
11:50-12:50
12:50-13:10
13:10 - 15:45
0.50 DRILL
1.50 DRILL
P
P
2.50 DRILL
C
1.50 STKOH C
2.50 STKOH C
0.50 STKOH C
0.50 STKOH C
0.50 STKOH C
0.25 STKOH C
0.25 STKOH C
1.25 STKOH C
2.00 STKOH C
2.00 STKOH C
0.75 STKOH C
1.42 STKOH C
0.92 STKOH C
0.67 STKOH C
1.33 STKOH C
1.50 STKOH C
1.00 STKOH C
0.33 STKOH C
2.58 STKOH C
Phase
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Page 5 of 10
Start: 10/17/2001
Rig Release: 10/30/2001
Rig Number:
Spud Date: 10/17/2001
End:
Description of Operations
Orient TF to high side.
Drilling, TF = 30R, 1.6 / 1.6 bpm, 3200 psi, Drilled to 11,970
ft. Still drilling shale.
Decision was made to perform open hole sidetrack to locate
target sand.
POOH for sidetracking BHA.
Flag CT at 10,300 ft EOP.
Tag up at surface, shut down for crew change. Break
lubricator, change out BHA's. Pick up 1.83 deg motor and
non-bicenter DPI 2.75" bit to sidetrack. Change batteries in
MWD. Change out orienter. .
RIH with BHA #9, shallow hole test at 4500', all worked ok.
Continue RIH.
Log tie in pass down from 10375'. [-5 ft CTD].
RIH to Kick Off Point.
Ream down from 11460 - 11490 ft. TF = 120 deg. Flag CT at
11,490 ft.
Back ream. 1.6/1.6 bpm, 2950 psi.
Orient TF around to 150R.
Ream trough down from 11475 - 11490 ft. TF = 150L. Original
hole drilled at 90R at this depth. 1.6/ 1.6 bpm, 2950 psi.
Ream trough for open hole side track in Zone 1A sand. Ream
down from 11475 - 11490 ft at 0.5 fpm. TF = 150L. Back
ream.
Ream down at 0.2 FPM from 11475 - 11490 ft. TF = 150L.
1.6/ 1.6 bpm, 2950 psi.
Drill Open hole sidetrack, 0.1 fpm. Lost 100 psi motor work at
11,494 ft. Bit jumped over ledge. Surveys indicated not
sidetracked. Pull up to 11,460 ft. ream trough down again.
Ream down at 11485 ft at 0.1 ft / 2 min. TF = 150L. Stacking
wt.
Having trouble with weight transfer. Having problems at shale
at 11308'. Backream up through shale, and short trip to shoe.
Order new mud with 12 ppb clayguard. Tagged shale at 11308'
on way back in hole. Work it a couple of times to ensure that it
is free. Continue to bottom.
Begin side tracking. Moving flag 5' deeper to 11495'. Begin
troughing down from 11470'-11495' at 15 fph. Can1t get weight
transfer. Probably due to old mud. New mud on location.
Short trip while new mud is displaced.
OH displaced to new mud, continuing mud swap. Began down
troughing from 11470' at 15 fph, getting much better weight
transfer now. Down weight 10500 Ibs. 1.6 in/out, 2900 psi ctp.
TF 150L. Saw work at 11490', then bounced through.
Continued to 11495' flag.
2nd down troughing pass. 11470'-11495'. 15 fph, 1.6 in/out.
2800 psi ctp. Completely swapped to new mud now. Did not
see any motor work at 11490' on this pass. Held 150 L tool
f;:ice during entire troughing pass.
3rd down troughing pass. 11470'-11495'. 15 fph, 1.6 inlout.
2825 psi ctp. Held 150 L tool face. No motor work at 11490'.
Back at flag, which is 11495' now. Park at flag for 20 minutes.
Begin time drilling at 0.1'/5 minutes. Getting small amounts of
Printed: 11/5/2001 10:48:46 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/24/2001
10/25/2001
(
(
BP EXPLORATION
Operations Summary Report
05-28
05-28A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From - To Hours Activity Code NPT
13:10 -15:45
15:45 - 16:05
16:05 - 16:25
16:25 - 17:25
17:25 -19:30
19:30 - 20:00
20:00 - 00:00
00:00 - 03:15
03:15 - 03:30
03:30 - 04:10
04:10 - 06:15
06:15 - 07:00
07:00 - 07:35
07:35 - 07:50
07:50 - 08:10
08:10 - 10:30
10:30 -10:45
10:45 - 11 :30
11:30-13:15
13:15 - 16:00
16:00 - 16:10
16:10-16:50
16:50 - 17:00
17:00 - 18:45
18:45 - 20:30
20:30 - 20:45
20:45 - 23:30
23:30 - 23:45
23:45 - 00:00
2.58 STKOH C
0.33 STKOH C
0.33 STKOH C
1.00 STKOH C
2.08 STKOH C
0.50 STKOH C
4.00 DRILL C
3.25 DRILL
C
0.25 DRILL
C
0.67 DRILL
C
2.08 DRILL
C
0.75 DRILL
0.58 DRILL
C
C
0.25 DRILL
C
0.33 DRILL
2.33 DRILL
0.25 DRILL
C
C
C
0.75 DRILL
1.75 DRILL
2.75 DRILL
0.17 DRILL
C
C
C
C
0.67 DRILL
0.17 DRILL
C
C
1.75 DRILL
C
1.75 DRILL
C
0.25 DRILL
2.75 DRILL
C
C
0.25 DRILL
C
0.25 DRILL
C
Phase
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Page 6 of 10
Start: 10/17/2001
Rig Release: 10/30/2001
Rig Number:
Spud Date: 10/17/2001
End:
Description of Operations
motor work every tenth of a foot.
Continue sidetrack. Increase ROP to 0.1' every 2 minutes.
Still drilling at 1.6 in/1.6 out. 100% returns. 2780 psi ctp.
Taking weight and getting motor work. Looks good.
Increase ROP to 0.1 fpm, (5 fph) getting 1500 Ibs WeB, 250
psi motor work from 11498'-11500'.
11500', increase ROP to 20 fph. Getting good motor work,
1500 Ibs weight on bit. Confirmation of sidetrack from
inclination. Drill to 11560',
POOH for BOP test, and to pick up lateral section BHA.
Layout sidetrack BHA.
Perform weekly BOPE Pressure / function test. Witness
waived by AOGCC.
Perform weekly BOPE pressure / function test. Witness
waived by AOGCC.
SAFETY MEETING. Reviewed HSE performance and BHA
make up.
M/U MWD BHA # 10 with 1.15 deg motor and HC bi-center bit
#8 RR2.
RIH with MWD BHA #10. Shallow test MWD tools and
orienter. RIH.
Logged Tie-in with GR at 10375 ft. Make -2 correction. RIH
Orient round to 150L, run through sidetrack ok, no bobbles on
weight.
Drill directionally from 11565'. Free spin 3050 psi, drilling at
3380 psi CTP, 1.6 in/out, ROP=40 fpm.
11584', orient to 60R
Resume drilling
11645' Difficult to get good weight transfer. Mini short trip to
just below sidetrack depth. 11520'.
Resume drilling.
11673' Wiper trip to shoe.
Resume drilling, 1.6 in/out,
11770', orienting. Attempting to drop down to 8730' TVD from
8725'.
Resume drilling. 1.6 in/out.
11784', orient back to high side to build back up to 8725' from
8730'. (Dueling geologists???).
Resume drilling. 1.6 in/out, Free spin 3150 psi. Drilling at
3650 psi. TF 30R.
Drilled to 11,865 ft.
Wiper trip to window. Hole in good condition. RIH and tag TD
at 11865 ft.
Orient TF to 45R.
Drilling, TF = 60R. 1.6 /1.6 bpm, 3200 psi, 93 deg inct.
Drilled to 11,941 ft.
Orient TF to high side. After spudding thru shale at 11903 ft,
Incl fell
from 92.8 deg to 87 deg in 6 ft MD, despite having a building
TF.
Orient to high side to get back to 93 deg incl.
Drilling, TF = 5R, 1.6/1.6 bpm, Incl = 87.7 deg, trying to
build incl back up to 93 deg. Drilled to 11950 ft.
Printed: 11/5/2001 10:48:46 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/26/2001
10/27/2001
(
(
BP EXPLORATION
Operations Summary Report
05-28
05-28A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
00:00 - 00:30
From - To Hours Activity Code NPT
00:30 - 02:30
02:30 - 04:30
04:30 - 04:45
04:45 - 06:30
06:30 - 07:20
07:20 - 08:30
08:30 - 09:30
09:30 - 12:30
12:30 - 14:30
14:30 - 18:00
18:00 - 18:10
18:10 - 19:30
19:30 - 20:00
20:00 - 22:00
22:00 - 00:00
00:00 - 01 :00
01:00 - 01:45
01 :45 - 04:00
04:00 - 05:20
05:20 - 05:45
05:45 - 06:50
06:50 - 09:00
09:00 - 12:20
12:20 - 12:50
0.50 DRILL
2.00 DRILL
2.00 DRILL
0.25 DRILL
1.75 DRILL
0.83 DRILL
1.17 DRILL
1.00 DRILL
3.00 DRILL
2.00 DRILL
3.50 DRILL
0.17 DRILL
1.33 DRILL
0.50 DRILL
2.00 DRILL
2.00 DRILL
1.00 DRILL
0.75 DRILL
2.25 DRILL
1.33 DRILL
0.42 DRILL
1.08 DRILL
2.17 DRILL
3.33 DRILL
0.50 DRILL
C
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
Phase
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Page 7 of 10
Start: 10/17/2001
Rig Release: 10/30/2001
Rig Number:
Spud Date: 10/17/2001
End:
Description of Operations
Drilling, TF = 5R, 1.5/ 1.5 bpm, 3100 psi, Drilled to 11,970
ft.
This was TD of Plugback hole.
Drilling, TF = 70R, 1.6 / 1.6 bpm, 3200 psi, 93 Deg incl.
Drilled to 12,002 ft.
Wiper trip to window. Hole was clean. RIH.
Orient TF.
Drilling, TF = 50R, 1.5/ 1.5 bpm, 3100 psi, Drilled to 12,028
ft.
Stacking weight at 12031'. Attempts to continue drilling
unsuccessful. Attempt a pill with higher lubtex content.
Pill was encouraging. Call town, swap to new mud.
12062', Short trip up to the shoe to wait for new mud.
Circulate at 10460', waiting on mud.
New mud on location, Run back in hole to resume drilling.
Begin mud swap.
12062', Return to drilling. 1.6 in/out. 3280 psi free spin?
Seems a bit high. Probably new mud with higher LSRV. Will
shear after a couple of circulations. ROP slow. Drilled into
shale at 12,090 ft. Still problems with weight transfer.
12110', orient 2 clicks to bring tool face up to 90L.
Resume drilling, 1.5 in/out, 3250 psi free spin, 20 fph Rap. TF
= 1 OOL.
Drilled to 12128 ft. Stacking Wt. Still drilling down out of
shale.
Wiper trip, 300 ft.
Drilling, TF = 90L, 1.6 / 1.6 bpm, 3250 psi, Drilled down into
good
sand at 12,160 ft. Drilled to 12,190 ft. Stacking Wt.
Wiper trip to window. Trip out clean. Ream shale at
12,120-12,150 ft.
Back at TD of 12,190 ft at 00:00 hrs.
Drilling, TF = 30L, Drilled out bottom of sand at 12180 ft.
Sand was only
2.2 vertical ft. thick. Drilled shale to 12,208 ft. Stacking wt.
200 ft wiper trip. Ream shales at 12,110 - 12,150' again. [180
API GR shale]
Drilling rathole for liner float equipment. TF = 10L, 1.5 / 1.5
bpm, 3200 psi.
Drilled to TD of 12,225 ft. Unable to drill further in shale.
Stacking 8000 Ibs at surface to drill ahead very slowly.
Wiper trip to window. Back ream shales at 12,150 -12,000 ft
at 6 fpm. Hole was clean to window.
Logged Tie-in with GR at 10,375 ft. Added 13 ft CTD.
RIH. Saw work through shale at 12,090'-12,150'. Tag bottom
at 12,235'.
Backream shale at 12090'-12150'. Getting motor work and
drag. Work both up and down to clean up. Had significant
motor work on first several passes up and down. Finally got it
cleaned up. Made final 3 passes through it clean.
POOH to begin running liner. EOP flags at 9800' & 8100'.
Tag up at surface, rig down drilling BHA. Hughes BC bit was in
perfect condition.
Printed: 11/5/2001 10:48:46 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/27/2001
10/28/2001
(
(
BP EXPLORATION
Operations Summary Report
05-28
05-28A
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
12:50 -13:35
From - To Hours Activity Code NPT
COMP
13:35 - 14:00
14:00 - 18:45
18:45 -19:15
19:15 - 21 :30
21 :30 - 22:30
22:30 - 00:00
00:00 - 00:30
00:30 - 01:15
01:15 - 04:00
04:00 - 04:15
04:15 - 05:00
05:00 - 05:35
05:35 - 06:25
06:25 - 07:15
07:15 -10:30
10:30 -12:00
12:00 -12:15
12:15 - 12:45
12:45 -13:00
13:00 -14:15
14:15 -16:00
0.75 CASE
0.42 CASE
4.75 CASE
0.50 CASE
2.25 CASE
1.00 CASE
1.50 CASE
0.50 CASE
0.75 CASE
2.75 CEMT
0.25 CEMT
0.75 CEMT
0.58 CEMT
0.83 CEMT
0.83 CEMT
3.25 CEMT
1.50 CEMT
0.25 CEMT
0.50 EVAL
0.25 EVAL
1.25 EVAL
1.75 EVAL
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
Phase
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
Page 8 of 10
Start: 10/17/2001
Rig Release: 10/30/2001
Rig Number:
Spud Date: 10/17/2001
End:
Description of Operations
Safety meeting prior to running liner. Discussed order of liner
running, kick proceedure for both the liner and CS Hydril inner
work string.
Wait for MWD to complete rigging down and move out of the
way.
MU 2-318" STL liner as per proceedure.
Shut down for Crew change and safety meeting prior to
resuming running CS Hydrill work string.
M/U 20 ft Baker stinger and 1" CSH workstring inside 2 3/8"
liner.
Fill CSH ann. with water.
Press test CSH ann. Space out and M/U Baker running tools.
Pull test running tools. Open 2 3/8" slips.
RIH with 2 3/8" liner on CT. Liner total length = 2,363.46 ft.
Circ. at 0.3 bpm at 1700 psi. Correct depth at flag at 8500', [-9
ft CTD]
RIH with liner, work to bottom from 12,000 -12,217 ft. Stack
wt several times at 12,217 ft CTD. Hard bottom. Shoe
appears to be at TD of 12,235 ft.
CT depth error partially caused by working CT many times to
get liner to bottom. Counter slippage.
Circ. 0.8 bpm, 2800 psi, Full returns, Pump 10 bbls to ensure
open hole is clean. Insert 5/8" ball. Displace with FloPro. Ball
on seat at 29.7 bbls, Sheared at 3800 psi, picked up, free
from liner. Sat down wt again.
Circulate well to slick 2% KCL water. Recover FloPro. Pump 1
bpm, returns of 0.8 bpm with water on formation. [20% loss].
1.0 I 0.7 bpm, 3700 psi pump press,
R/U DS cementing equipment.
SAFETY MEETING. Review cement job and hazards with
personnel.
Batch mix 15.8 ppg, G CMT. CMT at wt at 04:45 hrs.
Press test lines with 4000 psi.
Stage 15.8 ppg, G CMT slurry. 0.9 I 0.7 bpm, 3000 psi,
Pump 23.2 bbls CMT into coil. Purge cement lines.
Displace cement with 2 % KCL water with rig pumps.
Pump 0.9 bpm, 3000 psi, 0.6 bpm returns,
25 bbls displ, 0.7 bpm I 0.6 bpm, 3500 psi
30 bbls displ, 0.7 bpm I 0.6 bpm, 3900 psi.
35.3 bbls displ, 0.6 bpm I 0.5 bpm, 4000 psi. Stop
displacement.
17.0 bbls CMT returned around shoe.
Sting out. Lay in 2 bbls CMT in liner.
Pump 20 bbls Biozan [ 2 ppb ] to contaminate. Jet cement to
top of flapper valve. (Tagged at 12192')
POOH, jetting with KCL water.
Tag up at surface. Standback CS hydrill work string.
Lay down liner deployment tools.
Safety meeting prior to picking up radioactive memory logging
tools.
Make up SWS logging tool.
RIH with CS hydrill jointed pipe.
RIH with Memory tools on coil. BHA length=2374'. Cement
Printed: 11/5/2001 10:48:46 AM
(
(-
BP EXPLORATION Page 9 of 10
Operations Summary Report
Legal Well Name: 05-28
Common Well Name: 05-28A Spud Date: 10/17/2001
Event Name: REENTER+COMPLETE Start: 10/17/2001 End:
Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/28/2001 14:15 - 16:00 1.75 EVAL P COMP UCA=1600 psi at 14:30 PM.
16:00 -17:15 1.25 EVAL P COMP 9750', Begin down log with SWS Memory CNL-GR-CCL tool.
Cement UCA=2000 psi at 17:00 PM. Tagged up at 12197' on
down pass, CTM. No correction needed to get on depth to
tally.
17:15 -18:45 1.50 EVAL P COMP Log up off bottom at 12197'. Lay in 150 k LSRV Flo pro pill on
way out of hole. (14 bbls) Logging up at 30 fpm to 9,750 ft.
18:45 - 21 :00 2.25 EVAL P COMP POOH with Memory CNUGRICCL.
21 :00 - 22:00 1.00 EVAL P COMP Stand back 1" CSH workstring in doubles.
22:00 - 22:15 0.25 EVAL P COMP SAFETY MEETING. Review hazards and procedure for
handling CNL tools.
22:15 - 23:30 1.25 EVAL P COMP Recover SWS logging tools and download Memory data. Good
data.
Fax log to Anc.
23:30 - 00:00 0.50 PERF N WAIT COMP Wait on perf guns.
10/29/2001 00:00 - 00:30 0.50 PERF N WAIT COMP Wait on perf guns to arrive at rig.
00:30 - 01 :30 1.00 CASE P COMP Pressure test 2 3/8" Liner lap with 2000 psi. Press slowly
dropped to 1400 psi over 30 min. Liner Lap did not pass
pressure test.
01 :30 - 02:00 0.50 PERF P COMP Load SWS 1.56" perf guns into pipe shed. 54 guns total,
1,165 ft. total.
02:00 - 02:15 0.25 PERF P COMP SAFETY MEETING. Review gun handling procedures and
hazards.
02:15 - 05:15 3.00 PERF P COMP RIH with 54 perf guns, SWS 1.56" Power Jet, 4 SPF, 60 deg
phasing.
05:15 - 06:15 1.00 PERF P COMP RIH with 22 stds, 1" CSH workstring. M/U BKR tools. BHA =
2513.6 ft.
06:15 - 07:40 1.42 PERF P COMP RIH with CT. At 7700' MD at 07:20 hrs.
07:40 - 08:20 0.67 PERF N SFAL CaMP Leak on coil swivel. Repaired.
08:20 - 09:00 0.67 PERF P CaMP Continue to RIH with guns.
09:00 - 09:15 0.25 PERF P CaMP Tie into top of flapper valve.
09:15 - 09:35 0.33 PERF P CaMP Safety meeting prior to firing guns.
09:35 - 11 :40 2.08 PERF N DFAL COMP Repeat liner lap test, it failed. Also unable to fire guns with
EFire.
11 :40 - 13:00 1.33 PERF P COMP Position coil. Shoot upper guns using drop ball firing head.
10835'-11090',11350'-11550',11660'-11745'. 4 spf.
13:00 -15:00 2.00 PERF P COMP Pull Coil OOH.
15:00 -15:30 0.50 PERF P COMP Safety Meeting.
15:30 -16:30 1.00 PERF P CaMP Stand back CS Hydril.
16:30 - 17:00 0.50 PERF P CaMP Safety Meeting.
17:00 -18:00 1.00 PERF P COMP Lay down perf guns.
18:00 - 18:30 0.50 PERF P COMP Crew change/safety meeting.
18:30 - 20:30 2.00 PERF P COMP Resume laying down guns to E-Fire head. All shots fired to
this point. Found head packed w/ cmt. Head saw 400, 600
and 1000 psi press, but did not fire
20:30 - 21 :15 0.75 PERF N DFAL COMP MU ball drop head to guns that didn't fire
21: 15 - 21 :30 0.25 PERF N DFAL CaMP Safety mtg
21 :30 - 22:45 1.25 PERF N DFAL COMP MU 38 stds CSH
22:45 - 00:00 1.25 PERF N DFAL COMP RIH wI CT
10/30/2001 00:00 - 00:30 0.50 PERF N DFAL COMP Fin RIH w/ CT
00:30 - 01 :30 1.00 PERF N DFAL COMP Tag PBD at 12197' CTD. Corrto 12200'. Pump 5 bbls fresh
Flo Pro mud. Load 1/2" ball and displ w/ KCI at 1.3/3600 to
seat. Sheared at 3200 psi. Perforated 11970-12085' and
Printed: 11/5/2001 10:48:46AM
(
(-
BP EXPLORATION Page 10 of 10
Operations Summary Report
Legal Well Name: 05-28
Common Well Name: 05-28A Spud Date: 10/17/2001
Event Name: REENTER+COMPLETE Start: 10/17/2001 End:
Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001
Rig Name: NORDIC 1 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
10/30/2001 00:30 - 01 :30 1.00 PERF N DFAL COMP 12160-12185'
01 :30 - 03:00 1.50 PERF N DFAL COMP POOH wI CT
03:00 - 05:15 2.25 PERF N DFAL COMP LD CSH workstring
05:15 - 05:30 0.25 PERF N DFAL CaMP Safety mtg
05:30 - 07:00 1.50 PERF N DFAL COMP LD perf guns-all shots fired
07:00 - 07:30 0.50 RIGD P CaMP RI H wI nozzle to 2000'
07:30 - 08:45 1.25 RIGD P COMP WO MeOH
08:45 - 09:45 1.00 RIGD P CaMP POOH freeze protecting wI MeOH. SI swab. RU DS N2
09:45 - 10:00 0.25 RIGD P CaMP Safety mtg
10:00 -11:15 1.25 RIGD P CaMP PT DS. Displace CT wI N2 and bleed off
11:15 -15:00 3.75 RIGD P CaMP Pull CT to reel. Remove gooseneck. Set injector in box
15:00 - 16:30 1.50 RIGD P CaMP ND BOPE. NU tree cap and test
RREL 1630 hrs 10/30101
Printed: 11/5/2001 10:48:46 AM
ObP
('
BP Amoco
Baker Hughes INTEQ Survey Report
,----------- --------------------- --------------------_._-----.-.----_.-
Company: BP Amoco
Field: Prudhoe Bay
Site: PB DS 05
Well: 05-28
Wellpath: 05-28APB1
('
.ii.
....
INTEQ
-------- - --.----- ----.----------- ------- __h__- -- --- -- ---- -_n_____'- ----- -- _-n- --,
Date: 11/112001 Time: 15:32:21 Page: 1
Co-ordinate(NE) Reference: Well: 05-28. True North
Vertical (TVD) Reference: 53: 28 8/22/1991 00:0070.0
Section (VS) Reference: Well (0.OON,0.00E,346.96Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field:
-- ------------- ------------------ -------_____m_____------ --------------- -,---- ---------
--,- m__- - -------------------- n_______n___'------'-------------'----------_---'-n'------'------"-----'--------- -- - -- -- -
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
: Geo Datum: NAD27 (Clarke 1866)
: Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
Site:
-,---- --- -----------..----.---.----------- - ------ -------------------------------------.------.-------------h______- - ---------.-------------- -----
--'n -------------- ______n______--
- ---.- --------------.---------------------------------------------------------------------..--
PB DS 05
TR-11-15
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5947204.70 ft
697428.91 ft
Latitude: 70 15 35.696 N
Longitude: 148 24 14.424 W
North Reference: True
Grid Convergence: 1 .50 deg
-----------------------..-------.-------------------- -----.-------------------------------..------.-.------------..-.---------.---------------------------------------.-.. - --------- -------------------
- --- -- ---- ----- --
--- - ---- -
.-- ----- -------- -- --------.----------------_.-----,-._-----,_...._-------- -,--_._------ - _,_-------,----,',-------'-______n_____----,----, ---.-----------..,--. --.---------.------- .--- ._---,---.-------------------- ----,--- - -'--- -- ---
Well: 05-28
05-28
Well Position: +N/-S 1814.57 ft Northing:
+E/-W 747.76 ft Easting:
Position Uncertainty: 0.00 ft
5949038.14 ft
698128.80 ft
Slot Name:
Latitude:
Longitude:
28
70 15 53.542 N
148 23 52.662 W
- --.-,n_.-..-,---._-,--,-,-,-- '--'--------'_'___n_n______------------.-----...----,,-------..--..------------.,-------,---------------.---------_n____________n____'_'-------------'--_'_._.n-.____.--------------_.-,--- ------.-_____n- - - --------
n- .-- ----,-.------ -- ----'--------------'-----'---"'--------'-------"___'_h- -'--'-'-______n_'_"______.n.____.-------.---,-.----------..-.----------------.------...---------.-------------------------_._,-,-,---------_._._- -.----
Wellpath: 05-28APB1
500292220870
Current Datum: 53 : 28 8/22/1991 00:00
Magnetic Data: 11/1/2001
Field Strength: 57511 nT
Vertical Section: Depth From (TVD)
ft
--------------._----- --------'--'--"---"------------------------"-------------------------
0.00
Height
70.00 ft
+N/-S
ft
--------hh-"h_"'__--'---'-------'----"-'----"---- -
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
----,---...-...-..
0.00
05-28
10560.00 ft
Mean Sea Level
26.66 deg
80.81 deg
Direction
deg
-----"-----'----"'----'-"-------'---'---'___'__n'___--_------
346.96
Survey:
---..-...---. --.- '------"'__'_"h- ---______h__--"--_--------------------------'----------------.--...-.-.-----.-----.--..-..-------.---- -"'---'-------"--------'--------"---'---------______n__--_---------------..-------
10/23/2001
- h______--'-- h ----
-- .----- ----
- ---._-_.--...
------------..------------...--.-.---.------
- --------.-.,--------------.-..---.----...----.--.---,-.----.------'----"-------'-----'---------'--.---------.--------------"-"---'-"""-----""'--'-"--"----'--'-'-'--'..-"'-"--'-----'-----------'--'-----------.-"-------'-'----------"'------ -----------,-_._----- ------- ___h______-- -
MWD
Company: Baker Hughes INTEQ
Tool: MWD,MWD - Standard
Start Date:
Engineer:
Tied-to:
From: Definitive Path
-- ------,. ___h_____"-----"---'---"- -------..-----...----..--.-.-----.---.-..-.---,.--.--.-...-----,-...-.----.,---.--.-.-------------,..---.-,--..-------.-- --.---..--,---. --.----,.--.--...-- --"--"--..' --..--- -------.---..-....--.-,---------,.-,.---. -------. -- ,. --- - --- -.- - .
Annotation
10560.00
11970.00
Survey
8678.44
8812.59
KOP
TD
.. -.,-.-,--.--.,-....-,.,-:.,----... '--""-.'---"""-"-"-----"----'-'------"----"""------""'--"'-"---...------"'-".-"-7",-",.,---..-,....".----,--",,-,-,-,,--------"----------"'_'---,c--:"-"-'-'--------_'_----'-"'"_._--,~._-,-.---.--",_...._--_.-.--..."._-., "'---'."--.---- ---"----'-.-'-...-..--- -"-""".....-----
MD Inct ,Azim ,TVD, SSTVJ) , N/SEIW ' "Måp~ MapE ' DLS VS
---.,_.. -_....~._._- ,..: ..,--.....---_.:~!~._-_.---_.._--..~:~.~---,_._...._!!_. ._.--,._--,_.._--~~~:~._" _.._-_..:_--,~.._-,:,,_:,-,_._._---._.::~---,..--,:._,---_-----_.~fL.~_..._.,,-",-"._.,,-,._,..._...,~.._._..,_:_,~---_....,.._""~,~-~_!~,~~,._...,---.,~. .,.__.,~..- ,--....--
10560.00 37.13 350.84 8678.44 8608.44 5458.35 -796.81 5954473.34 697188.67 0.00 5497.42
10570.00 38.44 348.38 8686.35 8616.35 5464.38 -797.92 5954479.33 697187.41 19.97 5503.53
10623.51 45.53 332.26 8726.21 8656.21 5497.71 -810.21 5954512.32 697174.24 24.04 5538.78
10653.90 46.14 325.58 8747.40 8677.40 5516.36 -821.45 5954530.67 697162.51 15.89 5559.48
10687.83 54.49 319.95 8769.06 8699.06 5537.06 -837.29 5954550.95 697146.14 27.71 5583.23
10719.74
10758.33
10794.39
10833.64
10870.42
10904.09
10934.97
10977.07
11016.80
11051.82
11084.90
11111.82
11142.65
65.13
79.98
84.81
85.25
88.07
87.28
86.66
87.01
90.88
93.69
94.13
91.85
86.59
315.03
312.22
311.52
308.35
306.95
304.48
302.73
300.62
297.80
301.32
303.78
305.89
306.59
8785.09
8796.63
8801.40
8804.80
8806.94
8808.31
8809.94
8812.27
8813.00
8811.60
8809.34
8807.94
8808.36
8715.09
8726.63
8731.40
8734.80
8736.94
8738.31
8739.94
8742.27
8743.00
8741.60
8739.34
8737.94
8738.36
5557.31
5582.61
5606.46
5631.56
5653.98
5673.62
5690.69
5712.76
5732.14
5749.40
5767.15
5782.51
5800.72
-855.94
-882.54
-909.15
-939.12
-968.19
-995.51
-1021.19
-1056.96
-1091.62
-1122.05
-1149.87
-1171.93
-1196.79
5954570.70
5954595.29
5954618.43
5954642.73
5954664.38
5954683.29
5954699.67
5954720.79
5954739.25
5954755.70
5954772.72
5954787.49
5954805.04
697126.96
697099.71
697072.48
697041.86
697012.21
696984.39
696958.27
696921.93
696886.77
696855.90
696827.63
696805.17
696779.85
35.89
39.10
13.53
8.12
8.56
7.70
6.00
5.07
12.05
12.85
7.54
11.53
17.21
5607.16
5637.81
5667.04
5698.26
5726.66
5751.95
5774.37
5803.94
5830.64
5854.32
5877.89
5897.83
5921.18
-'----'-----'__"_h__"'_h--_____---_-_----n__--- -----.---......--.-..-..-----------..----------.-------.-----.--.--_"'_-_'_---'-------,--,------.------------_.._-------,-_.-----------"'--""--"--_'___"h'_'-__-_h'_'___-"----"-'-----'.-----..--,.---.--.. - - "'___h______---' -- -- --------- ---.
ObP
( (
BP Amoco
Baker Hughes INTEQ Survey Report
Biií8
.....
INT EQ
h--- --. -. - ---... _-_'h -- --- -.-- -.--- ----
Company: BP Amoco
, Field: Prudhoe Bay
Site: PB OS 05
Well: 05-28
Wellpath: 05-28APB1
---- -- -- -- ----- --- -- --- ----
-- ----- -----
---.- - -----.----
Date: 11/112001 Time: 15:32:21 Page: 2
Co-ordinate(NE) Reference: Well: 05-28. True North
Vertical (fVD) Reference: 53: 28 8/22/1991 00:0070.0
Section (VS) Reference: Well (0.00N.0.00E.346.96Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
.
Survey
,- -.....-- ------- _uu- ------------ ---------------------------_u_------.-.----------------------------------------------------------------------------. .---------- ---_u_-----------u_-----------, --- --
-- .-- --- --... _u_-- _____h______..--------------- -------- ---- --_...._------- --------.._----------------- -------------------------------------._---,---------------------_..------ -- ------ ----- -h_-_...---.
MD Incl Azim TV» SSTVD N/S EIW MapN MapE DLS VS
ft deg deg ft ft ft ft ft ft deg/10OO ft
,-- ---- --- -.-..-,..-------..-----------.---------.---------..---..---------------.---------.-----.--.--------------------..--------.--..-----..-- ------... ..--.....- --..u_.----- ----..._..._d .--..--.- --...- -- -
11176.67 89.38 309.41 8809.56 8739.56 5821.65 -1223.57 5954825.26 696752.52 11.66 5947.61
11227.59 87.89 311.16 8810.77 8740.77 5854.56 -1262.40 5954857.14 696712.84 4.51 5988.44
11262.46
11305.34
11337.96
11381.94
11414.51
11439.29
11486.54
11545.12
11574.94
11610.02
11651.87
11691.44
11738.64
11773.57
11804.07
11836.82
11877.17
11908.22
11925.77
11939.07
11970.00
89.74
89.30
90.35
91.76
90.79
90.00
92.81
93.87
93.60
92.46
88.24
84.46
85.43
88.68
89.56
88.68
86.75
92.02
91.23
89.65
89.65
314.33
317.84
320.66
324.88
327.34
329.09
332.96
337.88
340.34
343.16
345.62
347.38
351.95
353.35
354.41
356.16
357.22
357.92
356.52
357.57
357.57
8811.49
8811.85
8811.95
8811.14
8810.41
8810.24
8809.08
8805.67
8803.73
8801.87
8801.62
8804.14
8808.30
8810.09
8810.56
8811.06
8812.67
8813.00
8812.51
8812.40
8812.59
8741.49
8741.85
8741.95
8741.14
8740.41
8740.24
8739.08
8735.67
8733.73
8731.87
8731.62
8734.14
8738.30
8740.09
8740.56
8741.06
8742.67
8743.00
8742.51
8742.40
8742.59
5878.22
5909.11
5933.82
5968.82
5995.85
6016.91
6058.22
6111.38
6139.18
6172.45
6212.74
6251.13
6297.37
6331.96
6362.28
6394.92
6435.17
6466.17
6483.70
6496.98
6527.88
-1288.00
-1317.74
-1339.03
-1365.62
-1383.78
-1396.83
-1419.71
-1444.03
-1454.64
-1465.60
-1476.86
-1486.08
-1494.51
-1498.97
-1502.22
-1504.91
-1507.24
-1508.56
-1509.41
-1510.10
-1511.41
5954880.11
5954910.20
5954934.34
5954968.63
5954995.17
5955015.88
5955056.57
5955109.07
5955136.58
5955169.54
5955209.52
5955247.65
5955293.65
5955328.12
5955358.34
5955390.89
5955431.06
5955462.02
5955479.51
5955492.77
5955523.63
696686.63
696656.09
696634.16
696606.65
696587.79
696574.19
696550.24
696524.53
696513.19
696501.35
696489.04
696478.82
696469.17
696463.80
696459.75
696456.21
696452.82
696450.69
696449.38
696448.34
696446.22
10.52
8.25
9.22
10.11
8.12
7.75
10.12
8.58
8.28
8.66
11.67
10.53
9.86
10.13
4.52
5.98
5.46
17.12
9.16
14.26
.. ..-....-- d.......d_._-" ---- ""'--d .....-..-..---...._..."h_"".__"_d"_'__--"--""'-'-----."-_U"""---'...-....--..u...--,_u_...."",----...-"....---......-".....--.."u_--." --------"---"..._-,..........----_.............__..--------...-..--..---,,...,-,,- ,."---."m --.-.. ".."......,--.--
6017.26
6054.05
6082.93
6123.03
6153.45
6176.92
6222.32
6279.60
6309.08
6343.96
6385.75
6425.23
6472.18
6506.89
6537.16
6569.56
6609.30
6639.81
6657.07
6670.16
0.00
6700.56
Rig:
Ref. Dafum:
V.Section
Angle
WELLPATH DETAILS
05-2BA
500292220801
05-28APB1
11490.00
Nordic 1
53: 28 8/2211991 00:00
lO.OOft
7100
7000
6900
6800
Origin
+NI.S
Origin
+E/-W
Starting
From WD
345.00'
0.00
0.00
0.00
REFERENCE INFORMATION
Co-ordinate (N/E) Reference: Well Centre: 05-28. True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Slot - 28 (O.OON,O.OOE)
Measured Depth Reference: 53.288/22/1991 00:00 70.00
Calculation Method: Minimum Curvature
ANNOTATIONS
TVO
873891 1149000 KOP
872142 1223500 TO
8250
8300
8350
8400
8850
8900
8950
9000
MD A,"ototioo
LEGEND
6700
?600
~6500
<:)
<:)
'1"'6400
.....
-
... 6300
:c
1::6200
«:I
~6100
"';"
¡6000
::¡
J$5900
5800
5700
5600
5500
5400
Magnetic Field
Strength: 57507nT
Dip Angle: 80.80'
Date: 7/30/2001
Model: BGGM2001
Welip,'h (DS-28!O5-28A)
Ceeaiod By ad; f'olpis D,te 11/1/2001
-2500-2400-2300-2200-2100-2000-1900-1800-1I00-1600-1500-1400-1300-1200-1100-1000 -900 -800 -700 -600 -500 -400 -300 -200 -100
West(-)/East(...) [10Oftlin]
0
100
5250 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900 5950 6000 6050 6100 6150 6200 6250 6300 6350 6400 6450 6500 6550 6600 6650 6700 6750 6800 6850 6900 6950 7000 7050 7100 7150
Vertical Section at 345.00'
11/1/2001
3:29 PM
ObP
('
BP Amoco
Baker Hughes INTEQ Survey Report
(
B..
....
(NT EQ
.. -----..------------------ ------- ---- ---- -------------- ---------------------------------..--------------------------------------------------------- --------------------------- --- ----- __--On,
Company: BP Amoco
Field: Prudhoe Bay
Site: PB DS 05
Well: 05-28
Wellpath: 05-28A
Date: 11/1/2001 Time: 15:33:58 Page: 1
Co-ordinate(NE) Reference: Well: 05-28. True North
Vertical (TVD) Reference: 53 : 28 8/22/1991 00:00 70.0
Section (VS) Reference: Well (0.00N,O.00E.345.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Field:
-- _h__--__-__h______------- ----------------------------------- ----------------------------------.----------------------.------------------------------....------ ----- --.. ----.------------.--.---------..--
-- -------- ---------- - -------_.._---_.._----- ---------..-------------.-------------------------------------____m__..--__---------------------- --- - --
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
! Geo Datum: NAD27 (Clarke 1866)
~ Sys Datum: Mean Sea level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
------- -----------------------_.._---------------------~---------------- --- n"_____-------------------------------------,,---------------------..- -
--..-..--- --..- ..---------------..----------- -------------..----------------------------..-....------..---..----------------------___-.._n -----..-- - -
PB DS 05
TR-11-15
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
¡Site:
I
I
I
!
5947204.70 ft
697428.91 ft
Latitude: 70 15 35.696 N
Longitude: 148 24 14.424 W
North Reference: True
Grid Convergence: 1.50 deg
-..-- -..--- ------------------.--..-.---.-----------...------- ------------- -------n-____-------------- ---------_--____n_---____------------______n______----------n - ------ __n_----- --
- --- __--_n_- - -------------------------------------..--------..---------------._---------------------------------------------------------------------.. ---- ----------.------------------__...___n____- ---..--- ------------------------ -----------
Well: 05-28
05-28
Well Position: +N/-S 1814.57 ft Northing:
+E/-W 747.76 ft Easting:
Position Uncertainty: 0.00 ft
5949038.14 ft
698128.80 ft
Slot Name:
Latitude:
Longitude:
28
70 15 53.542 N
148 23 52.662 W
---- -------..-..---..-..--..------------------------- -_..------ ---------------- -- - "-----------------------------"------_____.n______-----------_-n--_..---..-.._-------------- -- -------------------'-_._-______m- - --------------------
- -..--- -------..------- ---.. -....---..----------.--------------------,---..----------------------------------------------------.--.------------..---------------_.._---_.._--------------------------u--,---,-----------------------------------..--- -- ____n______---------.. - ----______n____-
- --- - -. -- - --- -
Wellpath: 05-28A Drilled From: 05-28APB1
500292220801 Tie-on Depth: 11490.00 ft
Current Datum: 53 : 28 8/22/1991 00:00 Height 70.00 ft Above System Datum: Mean Sea level
Magnetic Data: 7/30/2001 Declination: 26.75 deg
Field Strength: 57507 nT Mag Dip Angle: 80.80 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
-..- --------------------------------------- ----------------.----- --------_u_-------------------------------------------------- ----- ---- -------_.---- ----------- -------------.._------ ------- ---
0.00 0.00 0.00 345.00
Survey:
- -----------..--....- ---------..-----..----------------------- ---... -----------------------,--------------.---------.------------ ---------..-------------------..----______n______------..--------------..----------..---------- ----- -_..--
10/27/2001
--..---- - - ------..--.. ..- -----------------....----------------,----------.-----...------_.._------,----------------------------------------- -..--..-------------.--..---------..-------------------------------------------_..----------------
MWD
Company: Baker Hughes INTEQ
Tool: MWD,MWD - Standard
Start Date:
Engineer:
Tied-to:
From: Definitive Path
Annotation
----- ----- -------------------------- ..---------------------------------------- --------- -------- -------------------------------- ------------------------ ----------------------------
Survey
8808.91
8791.42
KOP
TD
------ ----. -------- ..-
- -----'---"'-'-
-----..------------------.--- -- ..--------------- _--__--_m...__-
- -- --------------"------------'-----"--"""----"-~-":"----'--"--""--"------'-"'------------.--------'---'--"--"---."'-'---"'--'-----_":-----"-'-------....~_.._-_.._--------,----------:,-,,--"-'-~--¡--'---:-"--"-'----'-""-"-------.--"'-'--:---.---'r--"----------------,"-,'-"----- ----,------------..----------'---' -,--
MD bad, Aziul, TVD SSTVD, ,N/S, 'ELW"MIJPN. MapE DLS
- - - --..-- ----,-~----- ._,--_.._,-_.._,--~~.~._---_._:_.,----_..~,~~--_._-- ----,.,_..,----~t_..._--_.:_-_.._:---,-_:.!~-~, --~-,---_.._,.._,.--.~--_..__.._---_._~----_._----~~-~_._.,--._----_.._--~---,-_!!.~:_,- --:-------..- ---_._,- --,---~~---_.._....._-"...._----~~~~~-g~~-- --
11490.00 92.87 333.25 8808.91 8738.91 6061.30 -1421.27 5955059.61 696548.60 0.00
11528.11 87.54 321.36 8808.77 8738.77 6093.30 -1441.81 5955091.06 696527.22 34.18
11585.86 96.50 320.66 8806.74 8736.74 6138.12 -1478.09 5955134.90 696489.78 15.56
11613.49 98.70 320.30 8803.09 8733.09 6159.24 -1495.51 5955155.56 696471.80 8.07
11650.44 98.44 326.63 8797.57 8727.57 6188.59 -1517.25 5955184.32 696449.30 16.95
11695.29
11732.24
11761.19
11791.94
11825.39
11857.59
11903.31
11936.34
11968.54
12006.44
12036.77
12069.57
12096.84
91.49
87.98
87.54
89.30
90.79
89.65
92.64
88.51
93.78
95.10
96.50
93.87
90.53
331.55
332.96
337.88
340.34
343.51
347.02
348.08
352.30
353.70
356.87
359.68
2.49
1.79
8793.69
8793.86
8795.00
8795.84
8795.82
8795.69
8794.78
8794.45
8793.81
8790.87
8787.81
8784.84
8783.79
8723.69
8723.86
8725.00
8725.84
8725.82
8725.69
8724.78
8724.45
8723.81
8720.87
8717.81
8714.84
8713.79
6226.89
6259.59
6285.89
6314.60
6346.39
6377.53
6422.16
6454.69
6486.63
6524.29
6554.44
6587.10
6614.32
-1540.18
-1557.37
-1569.40
-1580.36
-1590.74
-1598.93
-1608.78
-1614.41
-1618.33
-1621.43
-1622.34
-1621.72
-1620.71
5955222.00
5955254.23
5955280.20
5955308.62
5955340.13
5955371.03
5955415.39
5955447.76
5955479.58
5955517.14
5955547.26
5955579.92
5955607.16
696425.38
696407.33
696394.61
696382.90
696371.69
696362.69
696351.66
696345.19
696340.42
696336.33
696334.63
696334.39
696334.69
18.96
10.24
17.05
9.83
10.47
11.46
6.94
17.87
16.93
9.04
10.31
11.71
12.51
\IS
ft
-----------,,-_._---------- -.._--.,--...._---
6222.62
6258.85
6311.52
6336.44
6370.41
6413.34
6449.37
6477.89
6508.46
6541.86
6574.05
6619.71
6652.59
6684.46
6721.63
6751.00
6782.38
6808.41
-------------_.._------..- -....- - - ------,.--------------..--..------------------------------------------------------------------------------....---------------------------------- -------------------..----------.-------------
ObP
( BP Amoco
Baker Hughes INTEQ Survey Report
('
Bii8
-=-
lNT EQ
..
- --- - -- --- ---- -- m_-
-- - --
- - - -- -- ------ --- ----,
Company: BP Amoco
Field: Prudhoe Bay
Site: PB DS 05
Well: 05-28
Wellpath: 05-28A
Date: 11/1/2001 Time: 15:33:58 Page: 2
Co-ordinate(NE) Reference: Well: 05-28, True North
Vertical (fVD) Reference: 53 : 28 8/22/1991 00:00 70.0
Section (VS) Reference: Well (0.ooN,O,00E,345.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
:
- - --------------------------------- -----------------------------------
----------______m______------- ---- ------ ------___n_.--.-
Survey
----------------------------------------------- ___m_- ------m----_-------- ----------------------- --.------- --------------------------------.---------- __n --------------- _--__n____n______--------,
MD Incl Azim TVD SSTVD N/S E/W MapN MapE DLS VS
ft deg deg ft ft ft ft ft ft deg/100ft ft
----------- ------__n__--___- --------- -------------- ------ -------- ---------
12129.37 86.57 356.16 8784.62 8714.62 6646.82 -1621.29 5955639.63 696333.25 21.15 6839.95
12165.87 84.20 350.89 8787.56 8717.56 6682.95 -1625.38 5955675.64 696328.20 15.79 6875.92
12201.99 87.71 350.89 8790.10 8720.10 6718.52 -1631.09 5955711.04 696321.57 9.72 6911.75
I 12235.00 87.71 350.89 8791.42 8721.42 6751.09 -1636.31 5955743.46 696315.49 0.00 6944.56
--- -----------. - .----_____n____u_---------- --- - --- u_-- ---------.. - --- ------ -- ------ _.
Rig:
Ref. Datum:
V.Section
Angle
345.00'
WELLPATH DETAILS
05.28A
500292220801
05-2BAPB1
11490.00
Nordic 1
53 : 28 8122/1991 00:00
70.00ft
7100
7000
6900
Origin
+EI.W
Starting
From TVD
0.00
0.00
0.00
REFERENCE !NFOHMAT!ON
We!! Centre: 05-28, True North
System: Mean Sea Leve!
Slot - 28 (O.OON,O.OOE)
53.288/22/1991 00:00 70.00
Minimum Curvature
ANNOTATIONS
TVO
873891 11490.00 KOf'
872142 12235.00 TO
8250
8300
8350
8400
8850
8900
8950
9000
MD Ao,ol'lioo
6800
6700
:?,600
=6500
0
0
OF' 6400
....
+6300
:c
1::6200
0
~6100
!6000
:::;
~5900
5800
5700
5600
5500
5400
LEOEND
Wellp,lh (O5-281O5.28A)
Dale 1111/200!
-2500-2400-2300-2200-2100-2000-1900-1800-1700-1600-1500-1400-1300-1200-1100-1000 -900 -800 -700 -600 -500 -400 -300 -200 -100
West(-)/East(+) (100ftlin]
0
100
5250 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900 5950 6000 6050 6100 6150 6200 6250 6300 6350 6400 6450 6500 6550 6600 6550 6700 6750 6800 6850 6900 6950 7000 7050 7100 7150
Vertical Section at 345.00.
11/1/2001
3:29 PM
I
~u~uŒ (ill~ ~~~~[K\~
(
ALAS IiA 0 IL AND GAS
CONS ERVATI ON CO MMI SSI ON /
TONY KNOWLES, GOVERNOR
333 W. TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Alistair Sherwood
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage AK 99519
Re:
Prudhoe Bay Unit 05-28A
BP Exploration (Alaska) Inc.
Permit No: 201-195
Sur Loc: 2431' SNL, 4220' WEL, SEC. 32, TIIN, RI5E, UM
Btmhole Loc. 4420' NSL, 432' WEL, SEC. 30, TIIN, RI5E, UM
Dear Mr. Sherwood:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe
Bay Unit 05-28A
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
( ß^^'"^'J~'~
c~~;f~~sli Taylor
Chair
BY ORDER OF THE COMMISSION
DATED this 3rd day of October, 2001
jjc/Enclosures
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
", f
(' STATE OF ALASKA {
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 MC 25.005
I~II\~' ,\ ,
JP ,.)1) J<flD(
'\0\ L' f) I ~
17,.)
/Q/cl</~/
1 a. Type of work 0 Drill II Redrill 1 b. Type of well 0 Exploratory ~ratigraPhiC Test II Development Oil
0 Re-Entry 0 Deepen 0 Service 0 Development Gas Si K1le Zone 0 Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. RKB = 70' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028326
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
2431' SNL, 4220' WEL, SEC. 32, T11 N, R15E, UM Prudhoe Bay Unit
At top of productive intelVal 8. Well Number
3081' NSL, 5006' WEL, SEC. 29, T11 N, R15E, UM .... Number 2S 100302630-277
At total depth 9. Approximate spud date
4420' NSL, 432' WEL, SEC. 30, T11 N, R15E, UM '-.' Amount $200,000.00
,~' "
12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028321, 858' MD No Close Approach 2560 12300' MD / 8740' TVDss
16. To be completed for deviated wells 0 17. Anticipated ~O AAC 25.035 (e) (2)}
Kick Off Depth 10560' MD Maximum Hole Angle 90 Maximum surf. ", ,. , At total depth (TVD) 8800' / 3200 psig
18. Casing Program Specifications Setting Depth
Size TOD Bottom Quantitv of Cement
Hole Casino Weiaht Grade CouDlina Lenath MD TVD MD TVD (include staae data\
311 2-3/811 4.6# L-80 ST-L 2450' 9850' 8053' 12300' 8740' 83 sx Class 'G'
I" i "" ,,'I ,I '..,'" ' "
\¡),.: I,;, <,' ." '", ! '"I
,:
19. To be completed for Redrill, Re-entry, and Deepen Operations. (~ ':.. ""\ r,~ (:;: ')c'r
" "- i.
Present well condition summary ,J£_t k. ,,;I ¿:.J L i
Total depth: measured 10928 feet Plugs (measured)
true vertical 8975 feet ,,' ,CI:
Effective depth: measured 10840 feet Junk (measured)
true vertical 8903 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" 11 Yds Arcticset 110' 1101
Surface 3916' 10-3/411 1265 sx CS III, 350 sx Class 'G' 3916' 3534'
Intermediate w/ Top Job: 90 sx CS II
Production 10150' 7-5/811 815 sx Class 'G' 10150' 8356'
Liner 1086' 5-1/211 95 sx Class 'G' 9837' - 1 0923' 8113' - 89711
Perforation depth: measured Open: 10702' - 10733'
Sqzd: 10690' - 10697'
true vertical Open: 8792' - 8817'
Sqzd: 8782' - 8788'
20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Alistair Sherwood, 564-4378 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the fO~~ ~~n~ i~ tr~ c:'r~,vto the be~t of my knowledge, Date 1/ufó!
Signed Alistair Sherwood r , )l¡}¡Ú/..A.7 r ¿fy~~?J/l . Title CT Drilling Engineer
'::: '~;,:~~,T~:~,":,TT1.:;:,:!::,:!;i>;::';:".:',:i;;:;;'; I.;::;i::!~,: i:i: ,iii::,'::;i,;:>:!: ;!¡\,: ;:';¡:'?¡:¡':"ii:;,:¡ ;:'::,..i:::i,;;;::;:!:,!i:Øqmmi~~:~~~l:!g'$ij:'¡Ø~J'~';!:;l::::!"i!:::i::,'::: ::,:c:'¡:::::¡i:i'¡):':,':,"::':¡:,';::: ,j:::,':;: '::.:::;;. :!,' :;:::,ii:':;;:::; '.', "::!':i?;::.,:,....::
:,;'.",.:" .::i.,':::::./:':,::'::. ;, 'i:;:';,;, ;,;
Permit Num~r I c¡ S API Number ^fl)~ v~ CI~~\ See cover letter
ZD ,..-,. . 50- 029-22208-01 for other reQuirements
Conditions of Approval: Samples Required DYes iii No Mud Log Require ~ DYes [I' No
Hydrogen Sulfide Measures I)D Yes DNo Directional SulVey Required Ii'Yes DNo
Required Working Pressure for BOPE D2K D3K D4K D5K D10K D15K ~5K psi for CTU
Other: ,., by order of
<tr~ginal SilO ~.(: IYI h II\J A I \n ~ \
Accroved Bv Commissioner the commission Date 0
Form 10-401 Rev. 12-0t'~ IllY - Subm't In Tri licate
p
(
(
BPX
05-28a Sidetrack
Summary of Operations:
A CTD sidetrack of well 05-28 will be drilled. Specific Prep Work, (Phase 1) and Drilling, (Phase 2)
operations are detailed below.
Phase 1: Isolate & integrity test inner annulus, (IA). Drift tubing and tag PBTD in liner. Set a cement
plug for kickoff.
Planned for October 5, 2001
. Run DGL V's. Liquid pack and integrity test the IA.
. Drift well and tag as deep as possible with slickline.
. Sa:t~~?~j~.1~t:~pJ~~?f~rw'i!ð:17:f;":(PBtÐri(fapproxi'fnåtely,'1 0 ,485' ,"Fl3Q~')i;~niçb, :i~..? ~'r~,9g\lØ '
the::~"([JÞ.~'af'~Ö:'5'6'O",'-~(ä';6ð8~::.:IV-P.~~~).:-""" ,'. .". ,.,""
Phase 2: Drill and Complete CTD sidetrack: Planned for October 11, 2001
2" coil will be used to mill a casing window, drill a 1,740',3" open hole sidetrack, (as per attached
plan) and run a solid, cemented & perforated 2%" liner completion.
Mud Program:
. Phase 1: Seawater
. Phase 2: Seawater for milling and Flo-Pro (8.6 - 8.7 ppg) for drilling
Disposal:
. No annular injection on this well.
. All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program:
. 2%", L-80, solid liner will be run from 9,850'md (TOL, 8053' TVDss) toTO at approximately 12,300'md.
Liner will be cemented to approximately 550' above the window with approximately 17 bbls (annular
volume plus 25% excess in OH) of 15.8 ppg class G cement.
Well Control:
. BOP diagram is attached.
. Pipe rams, blind rams and the CT pack off will be pressure tested t(jijr"
..,'
. The annular preventer will be tested to 400 psi and 2,200 psi.
Directional
. See attached directional plan.
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
. An MWD Gamma Ray log will be run over the open hole section.
. A memory CNL will be run inside the liner.
Hazards
. 05-28 flow stream was last sampled at 8ppm H2S in Nov 96. Drillsite 5 is not an H2S area.
. The well path will cross two mapped fault either side of a graben. The fault throw associated with this
structure is estimated at 10-15ft. Lost fluid circulation is not anticipated.
Reservoir Pressure
Reservoir pressure is e.§!jJp!~t~~~~~ø"be 3,200 psi at 8,800ss. Maximum surface pressure with gas (0.12
psi/ft) to surface is~f1'f4r4-~p'i3i. ' .
TREE= FMC ULTRA SLIM HOLE
WELLHEAD = FMC
ACTUA TOR = BAKER. C
KB. ELEV = 70'
BF. ELEV =
KOP= 1329'
Max Angle = 45 @ 9100'
Datum MD = 10798'
Datum TVD = 8800' SS
4-1/2" TBG, 12.6#,13-CR-80, -1
0.0152 bpf , ID = 3.958"
1 TOP OF 3-1/2" TBG 1
2987'
2987'
110-3/4" CSG, 45.5#, J-55, ID = 9.953" 1-1
3916'
Minimum 10 = 2.75" @ 9900'
OTIS XN NIPPLE
TOPOF 5-1/2" lNR 1
9837'
13-1/2" TBG, 9.2#, 13-CR-80, .00870 bpf , ID = 2.992" 1
7-5/8" CSG, 29.7#, l-80, ID = 6.875" 1-1
ÆRFORA TION SUMMA RY
REF lOG: BHCS on 09/04/91
ANGlEAT TOP ÆRF: 39 @ 10690'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 4 10690 - 10697 S 09/26/91
2-1/2" 4 10702 - 10733 0 09/26/91
05-28
9911'
10150' 1
8
2238'
2987'
('
SAFETY NOTES: CHROME TBG & lNR.
~4-1/2" OTIS HRQ SSSV NIP, 10 = 3.813" 1
-14-1/2" X 3-112" XO 1
GAS LIFT MANDRELS
ST MD lVD DEV TYÆ VlV lA TCH PORT DATE
1 3525 3217 36 FMHO RK
2 5992 5195 37 FMHO RK
3 7732 6551 40 FMHO RK
4 8715 7288 44 FMHO RK
5 9264 7678 42 FMHO RK
6 9683 7995 40 FMHO RKP
IPBTD I 10840'
15-1/2" lNR, 17#,13-CR-80, 0.0232 bpf,ID=4.892" 1 10928'
9810'
9900'
9910'
9911'
9896'
DATE REVBY COMMENTS DATE REV BY COMMENTS
09/08/91 ORIGINAL COMPLETION
01/12/01 SIS-Sl T CONV ERTED TO CA NV AS
02/09/01 SIS-lG REVISION
07/18/01 RN/KAK CORRECTIONS
-17-5/8" X 3-1/2" BAKER SB-3A PKR 1
-13-1/2" OTIS XN NIP, ID = 2.75" 1
1-13-1/2" BAKER SHEAROUT SUB 1
-13-1/2"TUBINGTAll 1
1-1 ELMD IT lOGGED 09/22/91 I
PRUDHOE BA Y UNIT
WELL: 05-28
ÆRMrr No: 91-110
API No: 50-029-22208-00
Sec. 32, T11 N, R15E, 5032.87 FEL 2034.62 FNl
BP Exploration (Alas ka)
TREE= FMC ULTRA SLIM HOLE
WELLHEAD = FMC
ACTUA TOR = BAKER C
KB. ELEV = 70'
BF. ELEV =
KOP= 1329'
Max Angle = 45 @ 9100'
Datum MD = 107981
Datum TVD = 8800' SS
05-28A
PROPOSED CTD SIDETRACK
4-1/2" TBG, 12.6#, 13-CR-80, -1
0.0152 bpf , ID = 3.958"
2987'
110-3/4" CSG, 45.5#, J-55, ID = 9.953" 1-1
3916'
Minimum 10 = 2.75" @ 9900'
OTIS XN NIPPLE
TOPOF 5-1/2" lNR 1
9837'
I 3-1/2" TBG, 9.2#, 13-CR-80, .00870 bpf , ID = 2.992" 1
7-5/8" CSG, 29.7#, l-80, ID = 6.875" 1-1
I Top of 17ppg Cement Plug Whipstock 1
(Perf's to be P&A 'd prior to Sidetrack)
PERFORA TION SUMMA RY
REF lOG: BHCS on 09/04/91
ANGLE AT TOP ÆRF: 39 @ 10690'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 4 1 0690 - 10697 S 09/26/91
2-1/2" 4 1 0702 - 10733 0 09/26/91
2238'
8
2987'
(
I SAFETY NOTES: CHROME TBG & lNR.
~4-1/2" OTIS HRQ SSSV NIP, 10 = 3.813" 1
-14-1/2" X 3-112" XO 1
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VlV lA TCH PORT DATE
1 3525 3217 36 FMHO RK
2 5992 5195 37 FMHO RK
3 7732 6551 40 FMHO RK
4 8715 7288 44 FMHO RK
5 9264 7678 42 FMHO RK
6 9683 7995 40 FMHO RKP
9810'
-17-5/8" X 3-1/2" BAKER SB-3A PKR 1
I Planned KOP 1-110560'1
13" Hole I
I ¿-3.8" l-80 LlNFR Cemt-1nlc~d & Perforaled I
Perfs P&A d w. Ccrrent to WS
DATE REVBY COMMENTS DATE REV BY COMMENTS
09/08/91 ORIGINAL COMPLETION
01/12/01 SIS-Sl T CONVERTED TO CANVAS
02/09/01 SIS-lG REVISION
07/18/01 RN/KAK CORRECTIONS
07/20/01 pcr 05-28A proposed ST
PRUDHOE BAY UNIT
WEll: 05-28A Proposed ST
ÆRMrrNo: 191-110
API No: 50-029-22208-01
Sec. 32, T11 N, R15E, 5032.87 Fa.. 2034.62 FNl
BP Exploration (Alas ka)
BP Amoco
WELLPATH DETAILS
PIoII#3 0S-21A
500212220101
Par... W.llpatll:
TI. .. MD.
RIO:
Rof. D.ho...
0S-21
10510.00
53 ,21 112211111 00000
70.000
v.s.ctio.
AGO'.
US.OO'
Drill'"
+NJ-S
0.00
~~\;
Sto-o
From TVD
0.00
0.00
REFERENCE INFORMATION
Co-ordinate (NÆ) Reference: Well Centre: 05-28, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Slot - 28 (O.OON,O.OOE)
Measured Depth Reference: 53: 28 812211991 00:00 70.00
Calculation Method: Minimum Curvature
SECTION DETAILS
So< 010 ... "" TVO +IU-S +E1-W DLeI u... vSec T...."
1 10552.20 37.13 350... alO2.22 5453.71 -796.01 0.00 0.00 5473.91
2 10560.00 37_13 350'" ....... 5458.... .796.a. 0.00 0.00 5478."
3 10570.00 ...44 340.3a "'8.35 5464... -7117.82 20.00 310.00 54&4.70
. 10850.27 10.00 322.30 a735.71 5&TT.1O -91 o.2a 20.00 320.00 5720.03
. 11..0.27 10.00 202.30 a735.71 5a57.a1 ."..... 10.00 -90.00 .......
0 "150.27 10.00 12.30 a735.79 8509.70 -1"'_0' 10.00 90.00 6673.23
7 1200D.27 10.00 7.30 a735.71 855.... -1480.14 10.00 270.00 8718.01
a 12085.27 87.10 350.30 a737.94 """77 .1475.25 10.00 -"0.00 6799.21
9 121a.... 10.00 351.40 a740.O7 8727.57 -1482.07 10.00 -70.00 ..a1.03
10 12300.00 10.00 338.34 8740.07 8853.33 ...,8.0T 10.00 -90.00 7012.19
ANNOTATIONS
TARŒrOETAL>
TVD
Nam.
.w.s <£I'" ......
1VO
OlD AG..totio.
1802.22 10552.20 TIP
1801.44 10510.00 KOP
1111.:05 10570.00 1
1735.71 10850.27 2
1735.71 11150.27 3
1735.71 11150.27 4
1735.71 12000.27 5
1737.84 12015.27 1
1740.07 12111... 7
1740.07 12300.00 TD
""'AT1.1 B135.00 5091.94 .1065.58 Pori
""...712 6135.00 5"B.26 -1302.67 Pon
...,...TU 6135.00 6251.05 .1405.11 Pori
OS-2BATU 8"".00 6655.65 .1575.81 PO><
""'A715 8""00 0797.17 -163194 Pori
Q5.2BA71' 67...00 7171.5<> .179222 Pori
8150
8200
8250
8300,
-
.5 8350
=
0 8400
II)
-
.c 8450
..
~
GJ 8500
Q .
Ci 8550
U
:e 8600
GJ
> 8650
GJ
2 8700
to-
8750'
+u
8800u,
8850
8900
545055005550560056505700 5750 5800 5850 5900 5950 6000
6700,
-
C
~ 6600
II-
0
0 6500,
...
-
-6400.
+ .
- .
~ 6300
0
Z 6200 .
-
-
1
~6100
..
:S6oo0
0
en
5900
Of)
,
LEGEND
05-16 (05-16)
..u- 05-16A (05-16A)
05-16B (05-16B)
05-28 (05-28)
uuuu Plan#3 05-28A
Plan #3
T
tl
t6
¡ Plan#3 05-28A:
4cc.!!2J
'~--;71
'--ili
r¿j
,'--¡'4l
! 05-28A T1.3,
~
Azimuths to True North
Magnetic North: 26.75°
Magnetic Field
Strength: 57507nT
Dip Angle: 80.80°
Date: 7/30/2001
Model: BGGM2001
I 05-28A T1.2i
¥
'.r
~
5500
Plan: Plan #3 (05-28/Plan#3 05-28A)
Created By: Brij Polnis
Date: 7/30/2001
fC.
i
f,,;,.. .
"
. ,-.,-'.j
"'.
"
'-
¡05-16(05-16)1',.
...,....~
11NTEQ
T
7100'-:-; 05-~~~,(~5-16B):
",
¡ 05-16A (05-16A))
7000,
---- -- -
Cnnlacllnf;;rm~ti(jn
DH';GL (~107; 2trl-C613
E.maiL 'urij.po:ni"..rWlr,tcq.wm
DCi,er HlIvi1es INTEO' ¡907i :?Gï-fo::;;')
~u
ß r-I'ÕS:28 (05-2j)J
i
i
\
i f<l1
,\~
\/!KO~
~
\~
-2700-2600-2500-2400-2300-2200-2100-2000-1900-1800-1700-1600-1500-1400-1300-1200-1100-1000 -900 -800 -700 -600 -500 -400 -300 -200 -100
West(-)/East(+) [100ft/in]
-.
[3l
.""..,
"".,
" '",.,.
"'-"'s. '~-..< r u:u" +~_..:;;-- u -~=::-===:~
... '..'.' . ! 5 ~. "~'/~"C=' t \ÌT5l. TO ..
". j , , ~8AJ
. . : '. .~ I 05-28A T1,5: L.Plan#3 05-2_-
I 05-28A T1.4¡ '"
'",
I 05-28A T1.6¡
"
".
6900,
6800
5800 '.
5700,
5600
"-'-.
"""--"hU......,
i°5-16A (Ós:.16Aj:r
"'1 0~16B_{05-16BÚ'\ 05-28)( 1
6200625063006350640064506500655066006650670067506800 6850 6900 6950 7000 7050 7100 7150 7200 7250 7300 7350 7400
Vertical Section at 345.00. [50ft/in]
--- -1/30/200-1
1-1 :43 AM
(
f
ObP
BP Amoco
Baker Hughes INTEQ Planning Report
Biï8
IIA.ICD.
HUGIll S
-----------.---.-.--.--.....-..-
lNT.EQ
--. - .-- -- .
- . -.-- -.-
.- .-- - ---
---- ----- -..--.
_n - --
! Company: BP Amoco Date: 7/30/2001 Time: 11 :43:26 Page:
¡ Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 05-28, True North
i Site: PB DS 05 Vertical (TVD) Reference: System: Mean Sea Level
i Well: 05-28 Section (VS) Reference: Well (0.00N,O.00E,345.00Azi)
L -~! ~~~~~:.- - ~!~.~.~...~. ~~ ~ ~ ~--_. ----.-...-- -.... - .... -...-- -.-. - -- ___._n.....n --. m _m.- - -- -- - - _n- --- -- ..-._...... ~.~ ~ ~~. -~~! .~~~ ~ ~ ~ --~ -~ ~~ -~.~ ~...... -m -~~ ~~ ~ ~~._~.~-~ ~ ~ ~ ~~ --. -. - m - - n- ~-~ :- --9. ~~.~~---- -.. -oo - ;
.____m___...- ----------..----.-----..----.--------- ------------------... - ---------- ----._-.._-------_u_-------_...----~---------------..._------.-----.---------------- ------n____..._-
! Field: Prudhoe Bay
I North Slope
: UNITED STATES
¡Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
l_~.~~~-~~~_:_!'-'1e.~~-~-~~ -~_:.~~~-_...- -----..-- - -----------
1
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre i
._-_._--_..._-----_....~~~mag~.!~~~~_~~el :_----~-~~~~_?!!..1......._- ------- - - - - -.. - ------ ----j
---_..-------------._-- -------------.-- ---------------.---"'------.--------.--'--------_.____n-----------.--- ----- -_--."'_m_____-
-- ....------.------------.- -.--
-------- ----------.----
PB DS 05
TR-11-15
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
Site:
5947204.70 ft
697428.91 ft
Latitude: 70 15 35.696 N
Longitude: 148 24 14.424 W
North Reference: True
Grid Convergence: 1.50 deg
--.-----.----------.--...-- -.- . ----------- n_n- -----.---.-.-...-.----- - --....- ------..--. --------.-.-------.---.-.--...--..----.--------------.-----______n_--____-------------
--------.
_._---.-.- ----_..._._~_...._- --------------...---------- .-----..---.---.----..-------...--------.----------- -----.-- .---- -.- ---.------------ ..- ---------- _._------------_._----~------------_.-
Well: 05-28
05-28
Well Position: +N/-S 1814.57 ft Northing:
+E/-W 747.76 ft Easting:
Position Uncertainty: 0.00 ft
Slot Name:
28
5949038.14 ft
698128.80 ft
Latitude:
Longitude:
70 15 53.542 N
148 23 52.662 W
.- --- --- .. - .----- - .-.- - .----. -------- -- -- - ... --..-- _n.. .- -. -- . --------------- ----. ----.-----.-- .-----.--------.---...------------.-.--------------.------_.._._._--~_...- -----_.- - . -- -.--- ..... -- ... _m_._- --
...... -- '---------m--.----..'-." - --- -.--------...----.-------.-.-.--.-.------------.--..- ---..-.--.--..-.--- - --.-.----.----.----.....----.--......---..
_____n.-____------------.--------
.---...-----------..--.--.----..-----
Wellpath: Plan#3 05-28A
500292220801
Current Datum: 53 : 28 8/22/1991 00:00
Magnetic Data: 7/30/2001
Field Strength: 57507 nT
Vertical Section: Depth From (TVD)
ft
-----..---.---.------ ._m_-.--
0.00
Height
Drilled From:
Tie-on Depth:
70.00 ft Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
.------.---..-----.-------.----..-----..-..--------.- _no.
0.00
05-28
10560.00 ft
Mean Sea level
26.75 deg
80.80 deg
Direction
deg
-. --.----'-'-------.-----.--.-. --'-...'--____._n_'____----.-
345.00
---.-.--.-. ----....-...----
------------......-..--
+N/-S
ft
...--.----. _.__m_____.-.--.---..------.-----..------
0.00
-.--------.---..-----.- -, .-------. -.---.. - --..-.--------..--.---------...-----.-.--------- .----.----.--..-.-.-..--..-..------.--------------------------""-.----------.---------------.---.------..--...-...-._-..-....----_.
[;~~~~~1=~~3~~~~- ~=~--=~--- ~~:~~ ~_~~-=~r;1;~~~d'~:~~~~!::;:~~~~~~~~~-~- _:.._--
Targets
r:'.'...'.'.'.."'.-""""""'..""."..""""'.""""'.'.'.""'.._.m"'."""""'.'~.',...oom...,........oo...........__...._........."'-"""'-""."-'.'U'-..-.-_u...u............_m.....m................--_uu-""""."-'_._......m__'___'--'-----'-.""._"""h""""",.,.,,moo...... -.............. ." ." . .... .oo .... ...
Map 'lap <---- Latitude ----> <--- Longitude --->
Name Description TVD +~/-S +E/~W Northing Easting Deg Min Sec Deg MiD See
: .ft .ft.. ..ft . .ft..ft ...
- ........ .........-... - .-.. ___..m._..__-.... .... -"'-'.--'--'.--...-. --- .--- oo"'-- --'oo. -..-.. .--..-..- --.- -.. -".-.. ..----.-..- _.m_._.__-. _"'_._m'__"",,- -.--.. -.....- .....- ...--.-....- ---...... "--- - -- ..-. ...-..-....- -..- ---........-.. .._........n --.- -...-"u .-- _m_.._....
05-28A T1.1 8735.00 5691.94 -1065.58 5954699.76 696913.86 70 1649.521 N 148 24 23.697 W
-Plan out by 171.46 at 8735.00 5660.35 -897.05 5954672.61 697083.15 70 16 49.211 N 148 24 18.788 W
05-28A T1.2 8735.00 5998.26 -1302.67 5954999.72 696668.80 70 16 52.534 N 148 24 30.604 W
-Plan out by 527.94 at 8735.00 5660.35 -897.05 5954672.61 697083.15 70 16 49.211 N 148 24 18.788 W
05-28A T1.3 8735.00 6251.05 -1406.11 5955249.68 696558.76 70 16 55.020 N 148 24 33.618 W
-Plan out by 779.79 at 8735.00 5660.35 -897.05 5954672.61 697083.15 70 16 49.211 N 148 24 18.788 W
05-28A T1.4 8740.00 6655.65 -1575.61 5955649.66 696378.68 70 16 58.999 N 148 24 38.557 W
05-28A T1.5
05-28A T1.6
8740.00
8740.00
6797.17
7171.50
-1631.94
5955789.64 696318.64
70 17 0.390 N
70 17 4.071 N
148 24 40.199 W
148 24 44.871 W
-1792.22
5956159.60 696148.58
.. ...."---'...-.-"---"--m--.-......---"'..'--.'.-'..-. '- -'-"'-.--."-."-.'---'.--.---"--".".-....-,-..-""",-,,-.-------------.-.-...-..--.--- -..'- ---..--..-..--...---......-.. -..----...........--.--.......-.. "."-----'--'-_..._"n"_____-"-"'--.""-,,. .-....-.. _..n_..._..-. ...--.--.-.----.
Annotation
I ... - -. oo... ... ~~.. ..... ........~... ~ ~.~_.... ... .....n m.. - -....... ... -.. .~.~~'--.-=-~ . .... - ...-....... - ...--=- . -- ~. ..==.=.=~.---~ -:. _...~.~-- ='~'oo'~-.-.~.-~'.~-'~"~.~'~'-'.:. oo- ..~:--.~-.~~-.".~.-.--~'- -=.-~~'-..-.-:.- -=.--=~'.~"': ..~~...-- .'=.--"".'.'--:=~".-.~'-:-"~.'~ ~'~.~.-]
10552.20 8602.22 TIP
10560.00 8608.44 KOP
10570.00 8616.35 1
10850.27 8735.79 2
11150.27 8735.79 3
11950.27 8735.79 4
12000.27 8735.79 5
12085.27 8737.94 6
12169.45 8740.07 7
12300.00 8740.07 TD
--..... .- ,--"-",.,,..---- ---~_.._-----.._- ----_u..-
...__n_..._.--..---..-..- nn ....'---'..--"-'----'-"---.--.-..--.-.--.oo.-----.--.-- - .---_.. ----... --'.. .---n__._'
ObP
('
(
BP Amoco
Baker Hughes INTEQ Planning Report
Ríi8
8AICD
HUGIIIS
""""-"""-""""""""""""-""-"..
INTEQ
r"'" .. . "" . ... ....
¡Company: BP Amoco
! Field: Prudhoe Bay
I Site: PB OS 05
i Well: 05-28
I Well path: Plan#3 05-28A
l.....................................................................................................................................-...........................................................'-"""-""""""""""" """""-""""""""""..."""'-'-""""""""""""""""""""""""""'"-...................h..........................................................._............"""""""""""""""""""""""""""..-...................'
Plan Section Information
¡--.... MD Incl Azim TVD +N/~S""-"--¡E¡:W"'--"'---"DLS-"-B~ild-"'-"-'T;~-'-h"'--TFO---T~~get---'--""""'-"---"--"'1
I ft deg deg ft ft ft deg/100ft deg/100ft deg/10OO deg I
,..... .. ...... ..............-.......... ........ ....-. ..-....... ....... ..-.......... .....................- .-..... ...-......... -""""-' -........-...--...................... ......... .........-.............................. .-.................. """""""""" .... ................-....... ........ ..... .......... "'-""".""....'" ........ """" ....... ............................ ..........."""""""'" ...-...'......... ............. ....... .....-..- ..-.... ......,
.. 10552.20 37.13 350.84 8602.22 5453.71 -796.06 0.00 0.00 0.00 0.00 '
10560.00 37.13 350.84 8608.44 5458.36 -796.81 0.00 0.00 0.00 0.00
10570.00 38.44 348.38 8616.35 5464.38 -797.92 20.00 13.12 -24.65 310.00
10850.27 90.00 322.30 8735.79 5677.90 -910.28 20.00 18.40 -9.30 328.00
11150.27 90.00 292.30 8735.79 5857.61 -1146.22 10.00 0.00 -10.00 -90.00
11950.27 90.00 12.30 8735.79 6509.76 -1488.64 10.00 0.00 10.00 90.00
12000.27 90.00 7.30 8735.79 6559.01 -1480.14 10.00 0.00 -10.00 270.00
12085.27 87.10 359.30 8737.94 6643.77 -1475.25 10.00 -3.41 -9.40 -110.00
12169.45 90.00 351.40 8740.07 6727.57 -1482.07 10.00 3.44 -9.39 -70.00
12300.00 90.00 338.34 8740.07 6853.32 -1516.07 10.00 0.00 -10.00 -90.00
...--........,,-..
Survey
.. ..... ...... .-
""""""""'-""""-"""""""..............""""""""""""""""
.. ...... .....
Date: 7/30/2001 Time: 11 :43:26 Page: 2
Co-ordinate(NE) Reference: Well: 05-28. True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,O.00E.345.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
'....m." ....... - '-"----......"""""",'-... -..-......-..................-..-....--....................-.....-..................--.-..-..-..--.....-..............-.....,,----..--..---....-....-...-..--...
""""""""'-""'...-......................."""""""""""""- ....... """"'-"""""""""""""""'..................-.............."""""'-"""""-""""""""---"""""'--"""""""""-"""""""""""'-"""'"""""""""""""""""""""""""""""".......................................-.."""""-""""""""""""'-""""""""""""""""""-"""-"""""""""...-........--
Tool
MD
ft
".......... "'"
10552.20
10560.00
1 0570.00
1 0575.00
1 0600.00
1 0625.00
1 0650.00
10675.00
10700.00
1 0725.00
1 0750.00
10775.00
10800.00
1 0825.00
10850.00
10850.27
10875.00
10900.00
1 0925.00
1 0950.00
1 0975.00
11000.00
11025.00
11050.00
11075.00
11100.00
11125.00
11150.00
11150.27
11175.00
11200.00
11225.00
11250.00
11275.00
11300.00
11325.00
11350.00
11375.00
11400.00
11425.00
lncl
deg
.. ""'""".""""',,
37.13
37.13
38.44
39.29
43.63
48.07
52.58
57.16
61.78
66.43
71.11
75.80
80.51
85.23
89.95
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
.AZiril
deg
.......... ".... ........
350.84
350.84
348.38
347.54
343.78
340.57
337.78
335.32
333.09
331.06
329.16
327.37
325.64
323.97
322.32
322.30
319.83
317.33
314.83
312.33
309.83
307.33
304.83
302.33
299.83
297.33
294.83
292.33
292.30
294.77
297.27
299.77
302.27
304.77
307.27
309.77
312.27
314.77
317.27
319.77
SSTVD N/S
ft ft
................. ....... ......
8602.22 5453.71
8608.44 5458.36
8616.35 5464.38
8620.24 5467.45
8638.98 5483.47
8656.39
8672.35
8686.73
8699.43
8710.34
8719.40
8726.51
8731.64
8734.74
8735.80
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
5500.53
5518.50
5537.25
5556.62
5576.48
5596.68
5617.05
5637.45
5657.71
5677.69
5677.90
5697.13
5715.88
5733.88
5751.12
5767.54
5783.13
5797.85
5811.68
5824.58
5836.54
5847.53
5857.52
5857.61
5867.48
5878.45
5890.39
5903.27
5917.08
5931.78
5947.35
5963.76
5980.97
5998.96
6017.69
E/W
ft
.. """.........."" ..
- 796.06
-796.81
-797.92
- 798.57
-802.69
-808.20
-815.05
-823.20
-832.57
-843.11
-854.72
-867.33
-880.83
-895.13
-910.10
-910.28
-925.82
-942.36
-959.70
-977.81
-996.65
-1016.20
-1036.40
-1057.23
-1078.64
-1100.59
-1123.04
-1145.96
-1146.22
-1168.89
-1191.35
-1213.32
-1234.74
-1255.58
-1275.80
-1295.36
-1314.22
-1332.34
-1349.70
-1366.26
MapN
ft
... """".... ..... ...........
5954468.71
5954473.34
5954479.33
5954482.38
5954498.29
5954515.20
5954532.98
5954551.50
5954570.63
5954590.20
5954610.08
5954630.11
5954650.15
5954670.03
5954689.60
5954689.81
5954708.63
5954726.93
5954744.47
5954761 .22
5954777.14
5954792.21
5954806.39
5954819.66
5954832.00
5954843.37
5954853.77
5954863.16
5954863.24
5954872.51
5954882.88
5954894.24
5954906.55
5954919.80
5954933.97
5954949.02
5954964.92
5954981.65
5954999.18
5955017.46
MapE
ft
""""""""""""
697189.54
697188.67
697187.40
697186.67
697182.13
697176.18
697168.85
697160.22
697150.34
697139.28
697127.14
697114.00
697099.97
697085.15
697069.65
697069.47
697053.43
697036.40
697018.60
697000.04
696980.77
696960.83
696940.24
696919.06
696897.32
696875.06
696852.33
696829.16
696828.90
696805.97
696783.23
696760.96
696739.21
696718.01
696697.42
696677 .46
696658.17
696639.60
696621.78
696604.74
DLS
deg/100ft
.. .....' ....... ............
0.00
0.00
19.97
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
VS
ft
".. "'" "...."...... ....
5473.91
5478.60
5484.70
5487.84
5504.38
5522.28
5541.41
5561.63
5582.77
5604.68
5627.20
5650.14
5673.33
5696.61
5719.78
5720.03
5742.63
5765.02
5786.90
5808.23
5828.97
5849.09
5868.53
5887.28
5905.28
5922.52
5938.94
5954.53
5954.68
5970.09
5986.49
6003.71
6021.70
6040.43
6059.86
6079.96
6100.69
6122.01
6143.88
6166.26
TFO
deg
...... ""'" ""."........." " ....... ...."......" ...
0.00 TI P
0.00 KOP
310.02 1
328.00 MWD
328.65 MWD
331.48 MWD
333.71 MWD
335.49 MWD
336.91 MWD
338.04 MWD
338.93 MWD
339.62 MWD
340.13 MWD
340.49 MWD
340.68 MWD
340.75 2
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWO
270.00 MWO
270.00 MWD
270.00 3
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
. """"""'---""-""""""-"""""""""""""""""""""'-""'-""""'" - "'---"""-""'-"......."-""""'" ... ...................--.........-.......-......................-............-....-... .............."""""""""""""""""""-""""...--,-"""""""""--""""",,,""""""'-"-""""""'...."-"" .......................-............ ........"" ""'........--"""""""""
ObP
(
~:
BP Amoco
Baker Hughes INTEQ Planning Report
Bií8
BAKUt
HUGHES
""--'-'--""'-'-'-"-"'-------"-'"
INTEQ
r"--- .-- ........ ..-
j Company: BP Amoco
I Field: Prudhoe Bay
i Site: PB OS 05
¡ Well: 05-28
I
i Well path: Plan#3 05-28A
"--._...............-..-... "'.....--........._"h"""_-'-'-"'..'-"-'-'_'_""h--"--'-"--'...'-'-'-"-""-'-""'-"""""-"""".........
mo. - ---"--..""-
,---.-....-.-.-..-- ...--. . .-- --. . -n' _h.._. . .... -.----..---, ..."..-.. .------.----- .- -- .---. ----¡
Date: 7/30/2001 Time: 11 :43:26 Page: 3
Co-ordinate(NE) Reference: Well: 05-28, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,345.00Azi) ¡
.....- m .. - ,.. "'--"'..m.._.__.- ..--. ..-- ~~. ~.~~-~ ~~~ ~_I.~_~~ ~~. ..~~~~.~~.:- ..----..... -~. ~~.!~.~~. g~ ~~t~~-~._- ........ .-....... !>...~.~._. -g.~~~.I.~--_..........J
Survey
I.. ..!.._~n~~._~~-~~~_..:t--~=t...~~~_~f~~=~=:~~-=;~1~~--~}~__=~4~~"::.1 ]
11450.00 90.00 322.27 8735.79 6037.12 -1381.98 5955036.47 696588.51 10.00 6189.10 90.00 MWD ;
11475.00 90.00 324.77 8735.79 6057.22 -1396.84 5955056.18 696573.12 10.00 6212.36 90.00 MWD I
11500.00 90.00 327.27 8735.79 6077.95 -1410.81 5955076.53 696558.61 10.00 6236.00 90.00 MWD
11525.00 90.00 329.77 8735.79 6099.27 -1423.86 5955097.50 696545.00 10.00 6259.97 90.00 MWD
11550.00 90.00 332.27 8735.79 6121.14 -1435.98 5955119.04 696532.32 10.00 6284.23 90.00 MWD
11575.00
11600.00
11625.00
11650.00
11675.00
11700.00
11725.00
11750.00
11775.00
11800.00
11825.00
11850.00
11875.00
11900.00
11925.00
11950.00
11950.27
11975.00
12000.00
12000.27
12025.00
12050.00
12075.00
12085.27
12100.00
12125.00
12150.00
12169.45
12175.00
12200.00
12225.00
12250.00
12275.00
12300.00
L____._-
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
90.00
89.15
88.30
87.45
87.10
87.60
88.46
89.33
90.00
90.00
90.00
90.00
90.00
90.00
90.00
334.77
337.27
339.77
342.27
344.77
347.27
349.77
352.27
354.77
357.27
359.77
2.27
4.77
7.27
9.77
12.27
12.30
9.83
7.33
7.30
4.98
2.63
0.27
359.30
357.91
355.57
353.22
351.40
350.84
348.34
345.84
343.34
340.84
338.34
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.79
8735.97
8736.53
8737.45
8737.94
8738.62
8739.48
8739.96
8740.07
8740.07
8740.07
8740.07
8740.07
8740.07
8740.07
6143.52
6166.36
6189.62
6213.26
6237.23
6261.49
6285.99
6310.68
6335.52
6360.46
6385.45
6410.44
6435.39
6460.25
6484.97
6509.51
6509.76
6534.03
6558.75
6559.01
6583.60
6608.53
6633.51
6643.77
6658.48
6683.42
6708.30
6727.57
6733.05
6757.64
6782.01
6806.11
6829.89
6853.32
-1447.12
-1457.28
-1466.43
-1474.56
-1481.65
-1487.69
-1492.66
-1496.56
-1499.38
-1501.12
-1501.76
-1501.31
-1499.78
-1497.16
-1493.45
-1488.67
-1488.64
-1483.89
-1480.17
-1480.14
-1477.50
-1475.84
-1475.21
-1475.25
-1475.61
-1477.03
-1479.47
-1482.07
-1482.93
-1487.44
-1493.02
-1499.66
-1507.35
-1516.07
5955141.11
5955163.68
5955186.69
5955210.10
5955233.88
5955257.97
5955282.33
5955306.91
5955331.66
5955356.54
5955381.51
5955406.50
5955431 .48
5955456.40
5955481.21
5955505.86
5955506.11
5955530.50
5955555.30
5955555.57
5955580.21
5955605.18
5955630.16
5955640.42
5955655.12
5955680.01
5955704.81
5955724.01
5955729.47
5955753.93
5955778.14
5955802.05
5955825.63
5955848.81
696520.59
696509.84
696500.08
696491.33
696483.61
696476.94
696471.32
696466.77
696463.30
696460.91
696459.61
696459.40
696460.27
696462.24
696465.30
696469.43
696469.45
696473.56
696476.63
696476.65
696478.65
696479.65
696479.62
696479.31
696478.57
696476.49
696473.39
696470.29
696469.29
696464.13
696457.91
696450.63
696442.32
696432.99
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.02
10.02
10.00
10.00
10.00
9.97
10.00
10.00
10.00
10.00
10.01
10.01
6308.73
6333.42
6358.26
6383.19
6408.18
6433.18
6458.13
6482.99
6507.71
6532.25
6556.55
6580.58
6604.28
6627.62
6650.54
6673.00
6673.23
6695.45
6718.36
6718.61
6741.67
6765.33
6789.29
6799.21
6813.51
6837.97
6862.63
6881.92
6887.44
6912.36
6937.34
6962.34
6987.30
7012.19
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 MWD
90.00 4
270.00 MWD
270.00 MWD
270.00 5
250.00 MWD
250.02 MWD
250.07 MWD
250.15 6
290.00 MWD
290.06 MWD
290.14 MWD
290.33 7
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 MWD
270.00 TO
----"""""-"---'----""_"'h... """"""'-"--""'--'-..--..'-"-'-- -----...------...-----........----....-.-......-......--------- -----.----..-----------..--.-----. --...-.....---.-----"..
/
.I
(
~ "CT
10.000 psi
Pack-off
Lubricator
Blind/Shear
7 1/16"
Pipe/Slips
Pipe/Slips
7 1/16"
Pipe/Gli~
7 1/16" JC 5.000 psl
t
-II
.
.....
SW AS OR MASTER VALVE
:l.tf
~I II
:;) I~
:ì II
'f"
H 194720
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
"I
(
DATE
07/31/01
GROSS
VENDOR
DISCOUNT
ALASKAOILA
NET
100.00
I=:. CHECK NO.
1°0194720
00
072701 CK072701K
PYMT OMMENT5:
HANDL NG INST:
Per it To Drill ee
5tH - Terrie Hub Ie
TOTAL ~
E ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE,
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
PAY
To The
ORDER
O-f
100.00
X4628
{)s:;.BA
100. a
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H
CONSOLIDATED COMMERCIAL ACCOUNT
194720
56-389
""'"'412
100.00
00194720
, '
, '
,.. '
OI\lJ;HUI\JDR ED 8< OOt 1 OOil;****************~***:**************** US DOLLAR
ALA~~A OIL AND GAS
CONSERVATION COMMISSION
:t3:)WE5T 7TH AVENUE
SUITE 100
ANCHORAGE
AK 99501
DATE
07/31/01
I I
NOT VALID AFTER 120 DAYS
\2 n,.,..o-""'""",,,"
, '., I
',," ,"" Ii: ~"V'.'
~ "f" "" A;",,' """,'
(, "¡t., ""
(.. ~ (} J Y ~ ~~ \
"... ".'~"
III . g ... 7 2 0 III I: 0'" . 2 0 :1 B g 5 I: 0 0 a ~... ¡. g III
AMOUNT
$lOO,O~1
-.ow
(
(
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETIER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME lf5u Oy Zß 4
CHECK 1
STANDARD LETTER
D EVELO PMENT
DEVELOPMENT
REDRIL/,
EXPLORATION
INJECTION WELL
INJECTION WELL
RED RILL
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
ANNULAR D}SP. OSAL
ltL)NO
ANNULAR DISPOSAL
L-> YES
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new wellbore segment of existing well
. Permit No, API No. . .
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(f), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
,
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . .
ANNULUS
L-> YES +
SPACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved, subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Companv Name) will assume the liability of any protest to
the spacing exception that may occur.
WELL PERMIT CHECKLIST
FIELD & POOL
ADMINISTRA TION
WELL NAME 05"- zg 4 PROGRAM: exp
7~/L- GEOLAREA
. -
1. Permit fee attached. .. . . . . . . . . .. . . . . . . . . . . N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . N
3. Unique well name and number. .. . . . . . . . . . . . . . . . N
4. Wellioeated in a defined pool.. . . . . . . . . . . . . . . . . N
5. Weilioeated proper distance from drilling unit boundary. . . . N
6. Weilioeated proper distance from other wells. . . . . . . N
7. Sufficient acreage available- in drilling unit.. . . . . . . . . . . N,
8. If deviated, is wellbóre plat included.. . . . . . . . . . . . . . N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . N
11. Permit ean be issued without conservation order. . . . . . . . N
~~ DATE. ( 12. Permit ea~'be issued without administrativ~ approval.. . . . . NN
&j. Zq',D 13. Can penT"t be approved before 15-day walt.. . . . . . . . . .
ENGINEERING ~ i: ~~~~;~~~::E~,:~'~~~~~~ i ~U~'~g': ': : ': : ~ ? ~~ ~~ ~~ "~ ~ \,
17. CMT vol adequate to.tie-in long string to surf csg. . . . . . . . Y N ~
18. GMT will cover all known productive horizons. . . . . -. . . . . ~ N
19. Casing designs adequate for C. T. B & permafrost. . . . . . . ~N \. l' ... \ '
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N "~~~I¡,....c ~~, ~~ ~~(!-~ ~~
21. If a re-drill. has a 1 D-403 for abandonment been approved. . . N ,.=>.) \ .~ \ -,..(\.. ,Î"\..
22. Ad~qUatew. ell~resepa~tionpropose~.. . . . . . . . . . . . N~. c\ac~R <::\~t(~(""\c:R~~~\.~C.J
23. If dlverter requIred, does It meet regulations. . . . . . . . . . . Y N-N ~ \"
24. Drilling ,fluid program schematic & equip list adequate. . ~ . . N .
25. BOPEs. do they meet regulation. . . . . . . . . ":",^,.~ . . . N . \ r'\ ""I L,u' 'n~ ""' \ <:::'\ ~ 0 \ ..1..- - \
. 26. BOPE press rating appropriate; test to s~ psig. N \-\~~ '< ~ ,""\-~ o(\'Y \'<~'. 1\~,....J\~ ~~~\"è'\~\o' ~~
27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N .
~g: ~~~:~~~~h;~~~~:~:~f;~~U~d~~n::::::::::: ~~~ù~~~W~~\~~~~\ ~\~~~'r-~~~\\Jf~~~~~n~. '
30. Permit can be issued wlo hydrogen sulfide measures. . . '0' y'Qr.? llot?CL~ J<ún,/; ~£2c:)k :D:3 oS- ~dvc:L~ '&,-?c) ~C>t'K-h 5
31. Data presented on potential overpressure zones. . . . . . . Y......-t( #~ S ,. . v
32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . .~.. A~ N
A~ DATI; 33. Seabed condition survey (if off-shore). . . . . . . . . . . . Y N
1,23,.6/ 34. Contact name/phone for weekly progress reports [expla Dry only] Y N
ANNULAR DlSPOSAL35. With proper cementing records. this plan .
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surtace; 0 0
(C) will not impair mechanical integrity of the well used for disposal; Y N
(0) will not damage producing formation or impair recovery from a Y N
pool; and
E will not circumvent 20 AAC 25.252 or 20 MG 25.412. Y N '
GEOLOGY: ENGINEERING: 0 0 UIC/Annular COMMISSION:
W~ .8~s
lCi " JM
COMP ANY
INIT CLASS ~
dev L redrll ¡ serv wellbore seg _ann. disposal para req-
UNIT# tJ//65Z::; ON/OFF SHORE ().n.
c
0
Z
0
-I
:E
::0
(
-
-I
m
-
Z
-I
oJ:
GEOLOGY
-
APPR
DATE
Y N
Y N
en
)-
::0
m
»
I
\
/
./
'-........ -_.../
---------
~þ~
Com m ents!1 ns tructi ons:
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)
(
;~'
Well History File
APPENDIX
"
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file. ,
To improve the readability of the Well History file and to
simplify finding information. information- of this
nature is accumulated at the end of the file under APPEN,DIX.
No special' effort has been made to chronologically
, .
organize this category of information.
((
\,
{
aD )-1 Cj5
!ulatJ
**** REEL HEADER ****
MWD
02/03/20
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
02/03/20
216746
01
1.75" NaviGamma - Gamma Ray
*** LIS COMMENT RECORD ***
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
Remark File Version 1.000
Extract File: ldwg.las
-Version Information
VERSo
WRAP.
-Well Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 10356.0000:
STOP.FT 12235.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API. API NYUMBER:
-Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 32
TOWN.N llN
RANG. 15E
PDAT. MSL
EPD . F 0
LMF . RKB
FAPD.F 70
DMF KB
EKB .F 70
EDF .F N/A
EGL .F N/A
CASE.F N/A
OSl . DIRECTIONAL
-Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is realtime data, unless otherwise
noted.
(4) Section from 10580' MD (8624' SSTVD) to 10663' MD (8683' SSTVD) was logged
during a MAD pass due to gamma problems. ROPS were lost for this section.
(5) Well 05-28A was kicked off @ 11490' MD (8739' SSTVD) from the
wellbore of Well 05-28APB1.
(6) Well 05-28A was drilled to TD at 12235' MD (8721' SSTVD).
(7) The interval from 12218' MD (8721' SSTVD) to 12235' MD (8721' SSTVD)
1.20:
NO:
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration, Inc.
05-28A
Prudhoe Bay Unit
5032.87' FEL, 2034.62' FEL
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Gamma Ray
27-0ct-Ol
500292220801
Description
-------------------------------
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(
(I
was not logged due to sensor to bit offset.
The data presented here is final and has been depth
shifted to a PDC (Primary Depth Control) curve supplied by BPX (SWS,
28-0ct-01) .
A Magnetic Declination correction of 26.75 degrees has been applied
to the Directional Surveys.
(8)
(9 )
MNEMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units)
ROPS -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth, feet
SENSOR OFFSETS:
RUN GAMMA DIRECTIONAL
1 19.00 ft. 24.00 ft.
2 19.08 ft. 24.08 ft.
3 19.33 it. 24.33 ft.
4 14.88 ft. 29.88 ft.
5 14.88 ft. 19.88 ft.
6 14.88 ft. 19.88 ft.
7 14.88 ft. 19.88 it.
8 19.34 ft. 24.34 ft.
9 19.53 ft. 24.53 ft.
10 19.24 ft. 24.24 ft.
11 19.43 ft. 24.43 ft.
CURVE SHIFT DATA
BASELINE, MEASURED,
10371.4, 10372.8,
10373.8, 10376.7,
10489.8,10489.8,
10510.6, 10509.8,
10534.0,10532.0,
10555.6,10549.6,
10624.1,10620.7,
10665.1,10661.3,
10687.9,10686.3,
10711.0, 10709.3,
10743.9,10741.7,
10810.0, 10808.6,
10829.8, 10827.2,
10941.4,10940.6,
10988.8,10987.2,
11047.6, 11047.2,
11180.9, 11178.8,
11474.4, 11472.8,
11626.8, 11626.6,
11652.3, 11650.2,
11678.7, 11676.3,
11698.4, 11697.6,
11733.3, 11732.3,
11735.7, 11735.9,
11739.9, 11739.9,
11744.2, 11742.4,
11924.1, 11923.7,
11962.8, 11959.9,
119":'1.2, 11970.1,
11976.0, 11975.4,
11991.0, 11991.6,
12055.8, 12058.2,
12127.7,12131.0,
12149.6,12153.3,
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAX
Tape Subtile: 1
DISPLACEMENT
1. 41406
2.82812
0
-0.807617
-2.02051
-6.06055
-3.43359
-3.83887
-1.61621
-1.61621
-2.22168
-1.41406
-2.62598
-0.808594
-1.61621
-0.404297
-2.01953
-1.61621
-0.202148
-2.02051
-2.42383
-0.807617
-1.00977
0.202148
0
-1.81836
-0.40332
-2.82812
-1.01074
-0.606445
0.605469
2.42383
3.23242
3.63672
118 records...
(
(
(
Minimum record length:
Maximum record length:
8 bytes
132 bytes
**** FILE HEADER ****
MWD
.001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
----------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
mwd.xtf
150
BP Exploration, Inc.
05-28A
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 28-0ct-01.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------- ------------------------------------------
GR
ROP
GR
ROP
GRAX10
ROPS10
0.0
0.0
* FORMAT RECORD
(TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name
Tool
Code Samples Units
Size
Length
1
2
GR
ROP
MWD
MWD
68
68
1
1
API
F/HR
4
4
4
4
-------
8
Total Data Records:
45
Tape File Start Depth = 10356.000000
Tape F~le End Depth = 12235.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
('
l
,
**** FILE TRAILER ****
Tape Subfile: 2
54 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD
.002
1024
*** INFORMATION TABLE: CONS
MN"EM VALU
----------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
mwd.xtf
150
BP Exploration, Inc.
05-28A
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX
ROPS
GRAX
ROPS
GRAX
ROPS
0.0
0.0
* FORMAT RECORD
(TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing:. 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name
Tool
Code Samples Units
Size
Length
1
2
GRAX
ROPS
MWD
MWD
68
68
1
1
API
F/HR
4
4
4
4
-------
8
Total Data Records:
45
Tape Fjle Start Depth
=
10356.000000
{
('
.
Tape File End Depth = 12235.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subfile: 3
54 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
02/03/20
216746
01
**** REEL TRAILER ****
MWD
02/03/20
BHI
01
Tape Subtile: 4
2 records...
Minimum record length:
Maximum record length:
13 2 bytes
132 bytes
Tape Subtile 1 is type: LIS
Tape Subtile 2 is type: LIS
DEPTH GR ROP
10356.0000 -999.2500 -999.2500
10356.5000 15.9201 -999.2500
10400.0000 -999.2500 -999.2500
10500.0000 17.8100 32.6780
10600.0000 32.4211 -999.2500
10700.0000 72.6751 33.9595
10800.0000 29.1263 86.3260
10900.0000 98.4579 74.8259
11000.0000 62.2636 53.3806
11100.0000 74.8093 35.2078
11200.0000 109.7191 58.8265
11300.0000 38.4847 112.7698
11400.0000 35.8099 89.4541
11500.0000 67.0088 27.0454
11600.0000 28.5474 39.8795
11700.0000 87.3265 50.9419
11800.0000 97.1418 49.6440
11900.0000 136.3286 62.8609
12000.0000 60.0575 11.4568
12100.0000 133.5036 15.3374
12200.0000 92.0297 32.6435
12235.0000 -999.2500 -999.2500
Tape File Start Depth = 10356.000000
Tape File End Depth 12235.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subtile 3 is type: LIS
DEPTH
GRAX
ROPS
-.
(,
('
10356.0000 15.5510 -999.2500
10356.5000 15.9710 -999.2500
10400.0000 -999.2500 -999.2500
10500.0000 17.8100 34.0910
10600.0000 35.4900 -999.2500
10700.0000 86.2830 27.1030
10800.0000 29.0210 134.8750
10900.0000 91. 9390 76.7250
11000.0000 62.5660 68.3550
11100.0000 68.6520 8.9600
11200.0000 109.3900 69.8500
11300.0000 38.4290 112.3580
11400.0000 38.8490 80.1870
11500.0000 71.6600 109.9790
11600.0000 30.0330 38.4320
11 700.0000 70.2930 84.0670
11800.0000 103.7030 24.4990
11900.0000 116.2880 63.7770
12000.0000 70.9000 12.9290
12100.0000 127.6790 29.5430
12200.0000 92.1600 29.6410
12235.0000 -999.2500 7.9910
Tape File Start Depth = 10356.000000
Tape File End Depth = 12235.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS