Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-195 WELL HISTORY FILE COVER PAGE XHVZS This page identifies oversize material and digital information available for this individual Well History file and weather or not it is available in the LaserPiche file. Please insure that it remains as the first page in this file. r;}oj , I if 5 Well History Pile # , Digital Data Added to LaserPiche Pile 0 CD's - # 0 DVD's - # - 0 Diskettes - # DYes o No DYes o No DYes o No Oversized Material Added to LaserPiche Pile 0 Maps # - 0 Mud Logs # _ 0 Other # - DYes o No DYes o No DYes o No General Notes or Comments about this file. If any ofthe information listed above is not available in the LaserPiche file you may contact the Alaska Oil & Gas Conservation Commission to request copies. Please call Robin Deason at (907) 793-1225 if you have any questions or information requests regarding this file. ;fjJ¿ ?//f/o? RECEIVED . STATE OF ALASKA I ALASKA Oil AND GAS CONSERVATION COM SION SEP 1 3 2006 WEll COMPLETION OR RECOMPLETION REPORT AND lOG I k 0'1 & G C C .. Alas a I as ons. ommlsslon A 1 a. Well Status: DOil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class: -.. 20AAC 25.105 20AAC 25.110 181 Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 7/6/2006 201-195 306-146 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 10/19/2001 50-029-22208-01-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 10/27/2001 PBU 05-28A 2431' FNL, 4220' FEL, SEC. 32, T11N, R15E, UM 8. KB Elevation (ft): 15. Field 1 Pool(s): Top of Productive Horizon: 3040' FSL, 5001' FEL, SEC. 29, T11N, R15E, UM 70' Prudhoe Bay Field 1 Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+ TVD) Pool 4320' FSL, 554' FEL, SEC. 30, T11 N, R15E, UM 12198 + 8790 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 698128 y- 5949039 Zone- ASP4 12235 + 8791 Ft ADL 028326 TPI: x- 697186 y- 5954487 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 696315 y- 5955745 Zone- ASP4 N/A MD DYes 181 No 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey N/A MSL 1900' (Approx.) 21. Logs Run: MWD, GR, Memory CNL, CCL 22. CASING, LINER AND CEMENTING RECORD . SËTTINGDËÞTHM[) SË1"TING DEPTH;rVD HOLE .'. '.. /c <\A,':·Y··· .... .SIZE 'AJ,. ·oJ,,¡:.. · .... · GRADE Top BOTTOM Top BOTTOM SIZË 6..^ ···d~~~~'·< 20" 91.5# H-40 Surface 110' Surface 110' 30" 11 Yards Arcticset 10-314" 45.5# J-55 Surface 3916' Surface 3534' 13-1/2" 1265 sx CS III, 350 sx 'G', TJ 90 sx CSII 7-518" 29.7# L-80 Surface 10150' Surface 8356' 9-7/8" 815 sx Class 'G' 5-1/2" 17# 13Cr80 9837' 10565' 8113' 8682' 6-3/4" 95 sx Class 'G' 2-3/8" 4.7# L-80 9872' 12235' 8140' 8791' 3" 113 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 24. <., USINGRË¿OR[)< .... ·x. '<'./ < '" Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None 3-1/2",9.2#,13Cr80 4289' - 9911' 9784' MD TVD MD TVD Kill String: 4-1/2", 12.6#, L-80 2487' None 25. AdrD,. .:... ¡·ETc. > H< ............... . vt:Mt:...., '<.<.' < ~D SEP 1 tb 20nf DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED '. . "'.. '""~. ~ 9423' P&A with 14 Bbls Class 'G' 4150' Set Bridge Plug wI Whipstock on Top 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BsL GAs-McF WATER-BsL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED OIL-BsL GAs-McF WATER-BsL OIL GRAVITY-API (CORR) Press. 24-HoUR RATE+ 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS BFl SEP 1 5 2006 Form 10-407 ReviseÖ 1~Tt; \ N A L CONTINUED ON REVERSE SIDE G 28. GEOLOGIC MARKE 29. RMATION TESTS NAME MD TVD Include and brie ummarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". 21TS 10614' 8719' None Zone 1 B 10580' 8694' Base of Sadlerochit 11000' 8813' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 31. I ~erebY certify that the ~ing.is true a d correct to the best of my knowledge. Signed Terrie Hubble Title Technical Assistant Date 09 13/ ~ PBU 05-28A Well Number 201-195 306-146 roval No. Prepared By NamelNumber: Drilling Engineer: Terrie Hubble, 564-4628 Jeff Cutler, 564-4134 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: Ifthis well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only · Page 1 of 2 Digital Wellfile Well Events for SurfaceWell - 051 Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> FS1 -> 05 -> 05-28 Date Range: 01/Jun/2006 to 13/Sep/2006 Data Source(s): DIMS, AWGRS Events Source Well Date DIMS 05-28 08/09/2006 AWGRS 05-28B 08/09/2006 DIMS 05-28 08/08/2006 DIMS 05-28 08/07/2006 DIMS 05-28 08/06/2006 DIMS 05-28 08/05/2006 DIMS 05-28 08/04/2006 DIMS 05-28 08/03/2006 DIMS 05-28 08/02/2006 DIMS 05-28 08/01/2006 DIMS 05-28 07/31/2006 DIMS 05-28 07/30/2006 DIrvlS 05-28 07/29/2006 DIMS 05-28 07/28/2006 DIMS 05-28 07/27/2006 DIMS 05-28 07/26/2006 DIMS 05-28 07/25/2006 AWGRS 05-28B 07/25/2006 AWGRS 05-28B 07/25/2006 DIMS 05-28 07/24/2006 DIMS 05-28 07/23/2006 AWGRS 05-28A 07/23/2006 AWGRS 05-28A 07/23/2006 AWGRS 05-28A 07/23/2006 DIMS 05-28 07/22/2006 AWGRS 05-28A 07/22/2006 Description ND BOPE. NU tree and test to 5000 psi. Install BPV and test to 1000 psi from below. Release rig for summer maintenance at 1630 hours. PULLED A 4" CIW TWC THRU TREE ON RIG 2ES. Lay down 4" DP. Test casing to 3500 psi. Run 4.5" tbg kill string, Prepare to ND BOPE. Ran 5.5" liner, Cemented liner at 11656'. POOH laying down 4" DP. Finish wiper trip, POOH. Rig up and run 5.5" liner. Drilled ahead to TD of 11666' MD, 8311' TVD. Circulate hole clean. Wiper trip to window at 4119'. Drill to 11201', clean hole. Wiper trip to 9144'. Drill to 11295'. RIH after short trip. Drill ahead to 10649'. Weight up with 14.15 ppg spike fluid to 10.5 ppg in active system. Drill to 9331'. Short trip to window at 4119'. Circulate clean. Drill from 6622' to 8677'. Drill 6 3/4" hole from 4169' to 6622'. Run in with drilling BHA and attempt to get out window(failed). Clean out window with mills.Run in and exit the window with the drilling assembly. Set whipstock and mill window, Perform Leak off test to 11.47 ppg EMW. Run USIT log. Change work scope to cut window instead of cut and pull 7 5/8" casing. Determine collar location in 7 5/8" with casing cutter. Lay down tubing,Test BOP with 5" and 4". Run cleanout to casing stub, Set bridge plug @4150'. Kill well. Test BOPE. Pulled 900' of 4 1/2" tubing. Move rig on to 5-28B and rig up on well. Start well kill operations. Pulled a 4" FMC BPV THRU BOP'S ON RIG SET A 4" FMC BPV PRE RIG Move sub from PBOC to DS05 and spot on 28B Moved rig from DS04 to PBOC. T/IA/OA = BPV/36/240. Temp = 5/1. Monitor OAP (pre-rig). OAP down 10 psi in 6 hrs. lAP up 6 psi. T/I/O=BPV/30/250 Temp=S/I WHP's (Post pump/Pre rig) lAP down 100 psi, OAP up 70 psi from initial pressure from 7/22/06. T/I/O=BPV/140/160 Load IA & OA w/ 9.8 ppg brine (Rig prep) - Load IA w/ 5 bbls meth & 260 bbls 9.8 ppg brine, Load OA w/ 5 bbls meth & 164 bbls 9.8 ppg brine for upcoming rig work, IA went on a vac, OAP @ 300 psi after SD, Bleed OAP Final WHP's=BPV/0/350 No summary information available in DIMS T/I/O= BPV/180/175 Temp=S/I Bleed lAP & OAP to 0+ (Pre rig) IA & OA fluid levels are at surface. Bleed lAP from 180 psi to 130 psi in 1 hr. (11 bbls to tank) Bleed OAP from 175 psi to 100 psi (3/4 bbl) in 5 min. Pressure increased to 155 psi in 10 min. Standby for Vac truck. OAP is up to 165 psi. Bleed OAP to 50 psi in 45 min (7.5 bbls to tank).OAP increased to 80 psi in 15 min, lAP holding at 130 psi. FWHP=BPV/130/85 AWGRS 05-28A 07/21/2006 T/I/O=BPV/180/200 Temp=SI Bleed WHPs to 0 psi (prep for sidetrack). IA & OA FLs @ surface. Bled OAP from 200 psi to 90 psi in 80 minutes with 8 bbls returned to slop trailer. Shut in and monitor for 30 minutes. OAP increased 60 psi to 150 psi. Final WHPs=BPV/180/150. AWGRS 05-28A 07/15/2006 T/IA/OA = 51/150/225 Repair Lockdown Screw Was able to free lockdown screw on Tubing Head. Annulus valve blocking face of pin, unable to use conventional torque wrench, tighten to approx. 450 ft/lbs., with hand wrench, AWGRS 05-28B 07/14/2006 Set 4" ISA for pre rig, no problems, ~WGRS 05-28A 07/11/2006 T/I/O = 0/160/110.. Temp = 51. WHPs post-bullhead kill (pre-rig). Tubing decreased 50 psi, lAP increased 60 psi, OAP decreased 30 psi, all overnight. AWGRS 05-28A 07/11/2006 T/I/O=40/220/120 Freeze Protect Flow Line (pre-sdtrck) Pumped 5 bbls neat methanol spear,65 bbls crude and 15 bbls diesel. Final HP's=40/220/120 http://digitalwellfile.bpweb.bp.com/W ellEvents/Home/Default.aspx 9/13/2006 Digital Wellfile AWGRS 05-28A 07/10/2006 AWGRS 05-28A 07/08/2006 AWGRS 05-28A 07/07/2006 AIJV.GRS 05-28A 07/06/2006 AWGRS 05-28A 07/05/2006 AWGRS 05-28A 07/04/2006 AWGRS 05-28A 06/25/2006 AWGRS 05-28A 06/24/2006 AWGRS 05-28A 06/22/2006 AWGRS 05-28A 06/22/2006 AWGRS 05-28A 06/21/2006 . Page 20f2 T/I/0=320/500/140 Circ-Out & Freeze Protect (shutlpre RWO) Bullheaded 5 bbls Meth, 85 bbls 9.8 ppg Brine and 3 bbls Diesel into TBG, Bullheaded 5 bbls Meth, 182 bbls 9.8 ppg NaCI Brine and 5 bbls Diesel into IA. Final WHP's=50/100/140 JET CUT TUBING AT 4289' ELM WITH 2.5" SLB POWER CUTTER. TIED INTO GLM AT 3516' TO CONFIRM DEPTH. POSITIVE INDICATION OF DETONATION SEEN ON SURFACE. CONFIRMED AFTER POOH. FINAL T/ 1/ 0 = 500/500/ 130. WELL LEFT SHUT IN AND TURNED OVER TO DSO. ******JOB COMPLETE***** ***WELL S/I ON ARRIVAL *** DRIFT W/ 2.5 CENT, S-BAILER TO TOP OF CEMENT @ 9423' SLM, S. BAILER EMPTY. DRIFT W/ 2.81" G-RING TO 4500' SLM FOR CHEM CUT. ***WELL LEFT SHUT IN, DSO NOTIFIED*** CTU 5. P & A. ***Job Co nt' from 7/5/2006 WSR***RIH with BDN...Tag 9892' ctmd..Correct to 9872' (Top of Baker deployment sleeve)..Pump 14 bbl Class G 15.8# cement...No bump,.Lay in l/1..Pumped 50 bbls of biozan for contaminate with 3/4" ball for ball drop nozzle. Contaminated to 9400' at 2: 1 ratio. Chased to surface with 1% XS KCI washing jewlery. Contaminated cement returns were seen at surface with end of Biozan sweep. Well freeze protected to 2000' with 30 bbls of 50:50 MeOH. Est TOC @ 9400' CTM. Notified pad operator of status. *** Job Complete *** CTU #5. Fish LTTP and P&A. MIRU. MU BHA #1 / Baker GS Spear. RIH to 9840' CTM and circulated 30 bbl Lubtex pill followed by 130 bbls of 1 % KCI. Engaged fish at 9884' CTM. Fish released with 1 jar hit. POOH with plug. MU BHA #2/ 2.5" BDN. Bullhead kill well with 160 bbls 1% KCI and RIH. *** Continued on WSR 7/6/2006 *** T/IA/OA=SI/300/100 Pre-rig well head MIT PPPOT-T-IC { NOTE} tubing hanger has been injected with Seal Tite product, May have trouble with BOP test. Function all LDS on tubing spool. OK Pressure up on Seal Tite to 5,000 psi. Function all LDS but [1] under annulus valve. Can't get socket over LDS because of valve in the way. Test 7-5/8" IC hanger to 3,800 psi. *** CONT FROM 06-24-06 WSR *** (attempt to pulllttp) JARRED ON LINER TOP FOR 2 HRS @ 4000#. DECISION MADE TO RIG DOWN. *** DSO NOTIFIED, WELL LEFT SI *** NOTE: BAITED 1 3/8" OVERSHOT SET ON FISH @ 9824' BLM ( 28" OAL, PULLS W/ 3 1/2" GS) *** WELL SI ON ARRIVAL, SSV DUMPED ON ARRIVAL *** (pulllttp) RIGGED UP B/L EQUIP, SET BAITED 1 3/8" OVERSHOT (28" OAL) ON LTTP @ 9835' BLM, JARRED ON LINER TOP FOR APPROX 3 HRS @ 4000# *** JOB IN PROGRESS/ CONT ON 06-25-06 WSR *** Assist S-line (Pull LTTP) - Job Canceled *** WSR CONTINUED FROM 6-21-06 *** (pre sidetrack) RUN 2.75 CENT. & 2" JOC LATCH PLUG @ 9854' SLM. UNABLE TO PULL LTTP. LRS WAS UNABLE TO PRESSURE TUBING TO SHEAR DISK IN LTTP DUE TO IA TRACKING TUBING PRESSURE. SWITCHED TO ,125" WIRE. MADE SEVERAL MORE TRIES TO PULL LTTP WITHOUT SUCCESS. LEFT LTTP IN HOLE. *** WELL LEFT S/I ON DEPARTURE PAD OPERATOR NOTIFIED. *** ***WELL S/I ON ARRIVAL*** (pre sidetrack) LATCH LTTP @ 9854' SLM W/ 2.75 CENT. & 2" SB. UNABLE TO PULL. UNABLE TO SHEAR PRESSURE DISK W/TRI-PLEX. CONTINUE TRYING TO PULL LTTP. IN PROGRESS. *** WSR CONTINUED ON 06-22-06 *** http://digitalwellfile.bpweb.bp.comIW ellEvents/Home/Default.aspx 9/1312006 ïREE '" FMC ULTRA SLIM HOLE WELLHEAD = FMC ACTUATOR = BAKERC KB. ELBI = 70' BF. ELBI = NA KOP= 1300' Max Angle = 99@11613' Datum MO = NA Datum lVO = 8800' SS 05-288 Suspended 08/09/06 10-3/4" CSG, 45.5#, J-55, 10 = 9.950" H 3896' I Minimum ID = 3.958" in 4" tbg. 5-1/2" LNR MILLOUTWINDOW 4119' - 4132' (OFF Wipstock) 17-5/8" X 5-1/2" BKR LNR HGR H 9837' 1 TOP OF 2-3/8" LNR, 4.7#, 10 = 1.995" H 9882' 3-1/2" TBG, 9.2#, 13-CR-80, -I 9910' .0087 bpf, 10 = 2.992" 5-1/2" LNR MILLOUT WINDOW 10565' - 10570' (OFF CMT RAMP) I 7-5/8" CSG, 29.7#, L-80, ID = 6.875" H 10150' ÆRFORA TION SUMMARY REF LOG: SWS MEMORY CNLlGRlCCL ON 10/29/01 ANGLEATTOPPERF: 85 @ 10835' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz OA TE 1-11/16" 4 10835 -11090 0 10/28/01 1-11/16" 4 11350 -11550 0 10/28/01 1-11/16" 4 11660 -11745 0 10/28/01 1-11/16" 4 11970 -12085 0 10/28/01 1-11/16" 4 12160 -12185 0 10/28/01 15-1/2" LNR, 17#, 13-CR-80, ID = 4.892" I 10923' DRLG DRAFT 2487' 4.5" tbg, 12.6#, IBT, 3.958" 10, kill string with mule shoe cut 3957' Ii 7-5/8 X 5-1/2" BOT ZXP packer I 4119' - TOp of 5.5" liner window 4132' l-i Bottom of 5.5" liner window 4500' H TOC I I 11656' ~ 15-1/2",17#, L-80 Hyd 521 liner 4.892" /01 9784' 9872' 9872' 9899' 9911' 9896' H 7-5/8" X 3-1/2" BA KER SB-3A A<R I H2.70"BKROEPLOYMENTSLV,10=2.25" I -I LTIP (SET 01/15/04) I I- 3-1/2" OTIS XN NIP, MILLED TO 2.80" 10 I 1- 3-1/2" WLEG (SOS) I I- ELMO TT LOGGED 09/22/91 I 2-3/8" LNR, 4.7#, L-80, .0039 bpf, 10 = 1.920" -i 12235' I DATE RBI BY COMMENTS DATE REV BY COMMENTS 09/08/91 ORIGINAL COM PLETION 10/30/01 CTD SIDETRACK 11/22/02 CI-VTLP CORRECTIONS 01/15/04 KSB/KK PULL PA TCH; SET L TIP 01/09/06 JRlMS Drill sidetrack/set liner PRUDHOE BA Y UNrr WELL: 05-28A ÆRMrr No: 2011950 API No: 50-029-22208-01 SEC 32, T11N, R15E, 2431' SNL & 4220' WEL BP Exploration (Alaska) R~~¿l v L...Ù AUG 0 8 2006 Schlumbel'gel' .~ Oil & Gas Cons. Co~ NO. 3883 Anchorage Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ¿)c{ - ¡C¡..5 "'Jr' ~ A ín~l\~i SCANNEO f.h \;, ,;. ~h -" , Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave. Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job # loa DescriDtian Date Bl Color CD NK-43 11211388 PROD P"..... ...... ..........·1 04/02106 1 NK-Z2A 10568415 PRoD ...., I...... W/DI:FT O~ 1 l4-12 N/A WFUlDl 05/09/06 1 l2-21A 10670034 MEM PROD PROFilE 09/20/04 1 13-06A 11217266 INJECTION PROFilE 07/12/06 1 01-178 11209602 MEM PROD PROFilE 04/27/06 1 09-08 11296705 INJECTION PROFilE 07/21/06 1 09-19 11296704 INJECTION PROFilE 07/20/06 1 09-25 11296703 INJECTION PROFilE 07/19/06 1 04-09 11211398 INJECTION PROFilE 04/28/06 1 04-10 11211380 INJECTION PROFilE 03/23/06 1 17-21 11223104 PROD PROFilE W/DEFT 03/22/06 1 18-03B 11057071 SBHP 12/02/05 1 X-15A 11212877 USIT 07/18/06 1 J-01 B 11511430 USIT 07/24/06 1 15-12A 11221595 USIT 07/25/06 1 Z-14B 11217268 USIT 07/29/06 1 S-400 10987564 CH EDIT PDC-GR OF USIT 01/26/06 1 D-03A 11217269 USIT 07/31/06 1 05·28A 11217267 USIT 07/28/06 1 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage. Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage. AK 99503-2838 ATTN: Beth 08/01/06 . . e e FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dave Wesley Senior Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage, AK 99519-6612 \' \C\ tf ~ù Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 05-28A Sundry Number: 306-146 Dear Mr. Wesley: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED thistßday of April, 2006 Encl. () IS 4-{¿fY /.t (/(1fe¡..;J;¡.{),b «tc. LJ /2-7/ ð b / ~ STATE OF ALASKA - ALASKA AND GAS CONSERVATION COIISSION APPLICATION FOR SUNDRY APPROVAL 20 MC 25.280 ~ol\- 4/2.1/2..004> iVED APR 2 5 2005 Commission . .! 1. Type of Request: a Abandon o Alter Casing o Change Approved Program o Suspend 0 Operation Shutdown 0 Perforate 0 Other o Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well o Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: / ~ Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number 201-195 / 6. API Number: 50-029-22208-01-00../ 99519-6612 70' 9. Well Name and Number: PBU 05-28A ../ 8. Property Designation: 111. . . . ..... Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): 12235 8791 12198 CasinQ LenQth Size Structural Conductor Surface Intermediate Productinn Liner MD Effective Depth TVD (ft) 8790 TVD 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool . ..' ' ; Plugs (measured): Junk (measured): 9872 None Burst Collapse ADL 028326 110' 3916' 10150' 20" 10-3/4" 7-5/8" 110' 3916' 10150' 110' 1490 470 3534' 3580 2090 8356' 6890 4790 8113' - 8682' 7740 6280 8140' - 8791' 11200 11780 Liner 728' 2363' 5-1/2" 2-3/8" 9837' - 10565' 9872' - 12235' Perforation Depth MD (ft): I Perforation Depth TVD (ft): I 10835' - 12185' 8805' - 8789' Packers and SSSV Type: 7-5/8" x 3-1/2" Baker 'SB-3A' packer Tubing Size: 3-1/2',9.2# x 4-1/2',12.6# Tubing Grade: 13Cr80 Packers and SSSV MD (ft): 9784' I Tubing MD (ft): 9911' 12. Attachments: ~ Description Summary of Proposal 0 BOP Sketch o Detailed Operations Program 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: o Exploratory ~ Development 0 Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name J~ave Wesley /"\ Title Senior Drilling Engineer . '¿ _ £ Prepared By Name/Number: SiQnature It'c8tt 1(£ /: 't--.. Phone 564-5153 Date Ý IZ0Gb Terrie Hubble, 564-4628 / i' Commission Use Only May 15, 2006 Date: 15. Well Status after proposed work: o Oil 0 Gas o WAG 0 GINJ ".,/ o Plugged ~ Abandoned o WINJ 0 WDSPL Contact Jeff Cutler, 564-4134 Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: (~fJ - /4 ÚJ o Plug Integrity æ(BOP Test 0 Mechanical Integrity Test Test- ßoe E- +0 ~çoo (>U . Other: A-erh91.1td r:öÝ!AA- 10 - 40 l V ~ o Location Clearance RBDMS 8Fl APR 2 8 2006 ~i' $.( ck ~tl4- ~ {( 0 S # ?, f g . S"''',,,"ool Fom Req";.oo, I '" -czJ Approved By: T J Fom 1()-4Q3 R<w;'''' 0712005 0 R 1G I ~ COMMISSIONER APPROVED BY THE COMMISSION Date 4-28,ðb Submit In Duplicate - e e Obp To: Winton Aubert - AOGCC Date: April 19, 2006 From: Jeff Cutler - BPXA GPB Rotary Drilling Subject: Reference: 05-28A Application for Sundry Approval - P&A for Sidetrack Operations API # 50-029-22208-01 Approval is requested for the proposed P&A of PBU well 05-28A. Well 5-28A was completed as a Z1 CTO sidetrack in November 2001 and produced steadily until April 2002 when a Cretaceous casing and tubing leak developed. The initial leak filled the tubing with sand which prevented the Cretaceous water from damaging the Ivishak. In April 2003, a tubing patch was set to repair the tubing leak. Coiled-tubing cleaned the Cretaceous sand from the tubing and nitrogen-lifted the well to production. 5-28A produced for 3 months before developing a second tubing leak. A second tubing patch was set in September 2003 but the well was unable to produce. No sand was observed in the tubing after the second leak and the Cretaceous water likely damaged the near-wellbore formation preventing the well from flowing. The well has been shut in since 1/03 due to a TxlA annular communication and a production casing leak. A sidetrack to re-establish the well as an Ivishak Zone 1 A/1 B producer is seen as the best way to maximize the value of the wellbore. The sidetrack is currently scheduled for Nabors rig 2ES, beginning mid July 2006. The pre-rig work for this sidetrack will begin at the Well's Group earliest convenience after sundry approval. Current Condition: ./ TxlA comm, PC Leak - Secured by L TTP 1/15/04. ./ 12/06/05: MITOA Failed, LLR = 2 bpm @ 480 psi ./ 5-1/2': 17#, L-80 tubing landed at 10,923'. ./ 4-1/2" OTIS HRQ SSSV nipple @ 2238' ./ 4-1/2" X 3-1/2" XO @ 2987' ./ 7-5/8" X 3-1/2" Baker SB-3 packer @ 9784. ./ L TTP @ 9872' Scope Pre-Ria ODerations: 1. Bleed the OA, IA and tubing pressures to zero. Test the IC (75/8") pack-off to 3,000 psi, test the tubing pack-off to 5,000 psi. Function all LOS, repair or replace as necessary. 2. RU slickline. RIH and pull LTTP set at 9872'. / 3. RU CT. RIH to the top of the 2-3/8" liner at 9872. P&A the wellbore by bullheadi 10 bbls/15.8 ppg cement down the 2-318" liner after the cement is bullheaded into the liner lay an ther 4 b Is of 15.8 ppg cement on top of the liner in the 3-1/2" tubing. This should leave TOC at -94 1" above the completion packer at 9784'. Cement volumes based on the following: 2325' of 2-3/8",4.7# liner @ 0.0039 bpf = 9.0 bbls 462' of 3-1/2",9.2# liner @ 0.0087 bpf = 4.0 bbls / 4. RU E-line. RIH and jet cut the 3-1/2" tubing in the middle of a joint - 4,300'. 5. Circulate the well to SW. Freeze protect the IA and tubing with diesel to - 2,200'. 6. Bleed all pressures to zero. Set BPV. Secure well. 7. Remove the well house and flow-line. If necessary, level the pad. Ria ODerations: 1. MI/RU Nabors 2ES. 2. Pull BPV. Circulate out freeze protection and displace the well to SW. 05-28A Application for Sundry e e 3. Monitor the OA, IA and tbg for pressure. Verify the well is dead. 4. Install a TWC. Nipple down the tree and adapter flange. 5. Nipple up the BOPE and test per Permit requirement. Pull the TWC. ./ 6. Pull the 4 1/2" X 3 1/2" tubing from the pre-rig cut at - 4,300'. 7. MU drift assembly and RIH to the tubing stump, PU 5" drill pipe singles. POH. 8. MU and RIH with a 7 5/8" HES CIBP, on 5" drill pipe. Set the CIBP at -4,100'. Test CIBP to 3,500psi. 9. Displace the well to 8.8ppg milling fluid, per MIDF recommendation. Spot an 18ppg viscous pill from the CIBP to the planned casing cut depth of -4,000'md. POH. 10. CO to 7 5/8" pipe rams and test. 11. MU a Baker Multi-string cutter. RIH and cut the 7 5/8" at 4,000' MD. Attempt to circulate through the cut to confirm a 'free' annulus. POH. LD multi-string cutter. 12. MU a casing spear, per Baker recommendation. BOLDS and pull the 7 5/8" casing free. LD the 7 5/8" casing from the cut. / 13. MU a 3 Y2" cementing stinger assembly. RIH to CIBP, spot a -45~bl, balanced 17.0 ppg kick-off cement plug, calculated on a gauge 9-7/8" hole behind the 7 5/8"" casing this should leave cement -315' inside the 10-3/4" surface casing. POH above the ceme and circulate string clean. POH, UD stinger assy. '... 14. CO to 3 112 X 6" VBR and test. WOC as required. 15. MU a 9 7/8" drilling assembly with DIR/GR/RES/PWD. 16. RIH to tag cement top. Confirm a solid cement plug. Test the 10 3,4" casing to 3,500psi'for 30 minutes. Record the test. TU~ lo - 4-0 ~ OJ J~I/",", ( . ress the cement down to the surface snde'. 18. Drill 20' of new hole and conduct a LOT. 19. Kick off and drill the 9 7/8" intermediate interval, per directional plan, to the top Sag River. 20. Circulate and condition hole. POH, UD 5" drill pipe and drilling assembly. 21. Run a 7 5/8",29.7#, BTC-M long string. Cement the 7 5/8" via 2 stages, utilizing a HES ES-cementer. The first stage TOC will be -1 0,200'md. The second stage TOC will be -5,000'md. 22. MU sufficient 4" drill pipe to reach planned TO of 14,461 'md. 23. MU a 6 3/4" DIR/GR/Res drilling assembly. 24. RIH to the ES-Cementer equipment. Test the 7 5/8" casing to 3,500psi. Drill out the ES-Cementer equipment and continue in hole to the float equipment. 25. R/U and test the 7 5/8" casing to 3,500psi for 30 minutes. Record the test. 26. Drill the float equipment and cement to the shoe. 27. Displace the well to the 8.5ppg Flo-Pro system. 28. Drill out the shoe and 20' of new formation. Circulate to consistent mud properties and conduct an FIT to 10.0ppg EMW. 29. Drill ahead, per directional proposal, to the planned horizontal landing point in Zone 1 A. CBU. 30. POH for bit I bha. 31. MU a 6 3/4" DIR/GR/Res/Den/Neu drilling assembly. RIH, acquire MAD pas data, per rig site geologist, through the build interval. 32. Drill the horizontal section to TO, estimated at 14,461 'md. 33. CBU, srr as needed, and circulate hole in preparation of running the 4 W' liner. Spot a liner running pill. POH, UD XS drill pipe and drilling assembly. 34. Run and cement a 4 1/2", 12.6#, L-80 liner to approximately 150' into the 7 5/8" casing. 35. Set the liner top packer and displace the well to clean seawater above the liner top. POH and UD LRT. 36. Test the casing X liner to 3,500psi for 30 minutes. Record the test. 37. MU Schlumberger 2 7/8" Power-jet tcp guns, at 6spf, and 2 7/8" drill pipe. RIH, tag, space, and fire guns. Perforation interval(s) to be determined by subsurface team. POH, UD all drill pipe and tcp guns. 38. Run a 4 1/2", 12.6#, L-80 completion, tying into the 4 1/2" liner top. Space and land the completion. RILDS. 39. Reverse circulate sea waterlcorrosion inhibitor per MIDF representative. 40. Drop the balllrod to seat. Set the production packer. 41. Individually test the tubing and the annulus to 3,500psi for 30 minutes. Record each test. 42. Shear the 'DCK' valve in the #5 GLM. Confirm shear with adequate flow in each direction. 43. Install a TWC and test. 44. NID the BOPE. N/U the adapter flange and tree. Test the tree and adapter to 5,000psi. 45. Pull the TWC. 46. R/U LRHOS. Reverse in sufficient volume of diesel to freeze-protect both the tubing and annulus to -2,200'. Allow the diesel to U-tube to equilibrium. 05-28A Application for Sundry - e 47. Install a SPV and test. Remove secondary annulus valve. Secure the well. 48. RD/MO. Post-RiQ Work: 1. Install well-house and flow-line. 2. MI/RU slickline. Pull the ball and rod 1 RHC plug from 'X' nipple below the new production packer. TiminQ: Estimated Pre-rig operations start date: Estimated Rig operations 1 spud date: 05/15/06 07/15/06 Jeff Cutler Operations Drilling Engineer 564-4134 05-28A Application for Sundry -TREE = FMC ULTRA SLIM HOLE WELLHEAO = FMC ACTUA TOR"= BAKER C KB. ELEV = 70' BF. ELEV = NA KOP = 1300' Max Angle = 99 @ 11613' Datum MO = NA Datum ïVO = 8800' SS 4-1/2" TBG, 12.6#, 13-CR. .0152 bpf, 10 = 3.958" 110-314" CSG, 45.5#, J-55, 10 = 9.950" I e 2985' Minimum ID = 1.995" @ 9882' TOP OF 2-3/8" LN R 05-28A . S.NOTES: 4-1/2" & 3-1/2" CHROMETBG & 5-1/2" CHROME LNR. WELL ANGLE> 700 @ 10735' & > 900 @ 11017'. 2238' 4-1/2" OTIS HRQ SSSV NIP, 10 = 3.813" 2987' -14-1/2" X 3-1/2" XO, 10 = 2.992" ST MO ïVO 1 3516 3140 2 5984 5119 3 7723 6473 4 8706 7211 5 9255 7601 6 9674 7918 GAS LIFT MANDRa.s OEV ìYÆ VLV LATCH 36 FMHO DMY RK 37 FMHO DMY RK 41 FMHO DMY RK 44 FMHO OMY RK 43 FMHO DMY RK 40 FMHO OMY RKP PORT DATE o 09/28/02 o 09/28/02 o 09/28/02 o 09/28/02 o 09/28/02 o 09/28/02 9784' -17-5/8" X 3-1/2" BAKERSB-3A PKR I 7-5/8"X5-1/2"BKRLNRHGR I 9837' 9872' -12.70" BKR DEA...OYMENT SLV, 10 = 2.25" 1 1 TOP OF 2-3/8" LNR, 4.7#, 10 = 1.995" I 9882' 9872' -1 LTTP (SET 01/15/04) I 9899' -13-1/2" OTIS XN NIP, MILLED TO 2.80" ID I 3-1/2" TBG, 9.2#, 13-CR-80, 9910' 9911' -13-1/2" WLEG (SOS) I .0087 bpf, 10 = 2.992" 9896' 1-1 ELMO TT LOGGED 09/22/91 I 7-5/8" CSG, 29.7#, L-80, 10 = 6.875" I 10150' PERFORA TION SUMMARY REF LOG: SWS MEMORY CNLlGRlCCL ON 10/29/01 ANGLE AT TOP PERF: 85 @ 10835' Note: Refer to Production OB for historical perf data SIZE SPF INTERV AL Opn/Sqz OA TE 1-11/16" 4 10835 -11090 0 10/28/01 1-11/16" 4 11350 -11550 0 10/28/01 1-11/16" 4 11660 - 11745 0 10/28/01 1-11/16" 4 11970 -12085 0 10/28/01 1-11/16" 4 12160 -12185 0 10/28/01 15-1/2" LNR, 17#, 13-CR-80, ID = 4.892" I 10923' DATE 09/08/91 10/30/01 11/22/02 09/28/02 05/08/03 07/30/03 REV BY COMMENTS ORIGINAL COM PLETION CTD SIDETRACK CORRECTIONS GL V C/O PULL FISH PA TCH & MIN 10 CORRECTION OA TE REV BY 08/19/03 CMOITLP 09/14/03 BJMcLITL 10/22/03 MJAITLH 12/28/03 JBIWPAG 01/15/04 KSB/KK COMMENTS OA TUM MO CORRECTION ECLIPSE PA TCH MIN 10 CORRECTION LNR 10 CORRECTION PULL PATCH; SET L TTP PRUDHOE BAY UNIT WELL: 05-28A PERMIT No: 2011950 API No: 50-029-22208-01 SEC 32, T11 N, R15E, 2431' SNL & 4220' WEL CHlTLP MHlKAK JJ/KAK ??/KAK 5-1/2" LNR MILLOUTWINDOW 10565' - 10570' (OFF CMT RAMP) 2-3/8" LNR, 4.7#, L-80, .0039 bpf, 10 = 1.920" -1 12235' 1 BP Exploration (Alaska) . , . 05-288 Propo.d Completion e 2,200 ~14 1/2" 'X' landing nipple, ID = 3.813" I TREE = WELLHEAD = ACTUATOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum Mò = Datum 1VD = FMC SLIM HOLE Frv1C BAKER C 70' NA 1300' 99 @ 11613' NA 8800'SS 103/4",45.5#, J-55, 1 3,896 GAS LIFT MANDRELS L-80, csg ID = 9.950" ST MD 1VD DEV TYPE VLV LATCH PORT DATE 5 1BD 3150 41/2" X 1" KBMG DCK BK 4 1BD 4750 4 1/2" X 1" KBMG DMY BK 3 1BD 6000 41/2" X 1" KBMG DMY BK 2 1BD 7000 41/2" X 1" KBMG DMY BK 1 1BD 7900 41/2" X 1" KBMG DMY BK 75'8'CIBP H Pre-rig tbg cut. 3 1/2"'1 9.2#, 13-CR-80 ~100 4,300 I 5 1/2" liner top H 9,837 75/8",29.7#, L·80, csg ID = 6.875" 1 10,150 I 51/2", 17#. 13CR- 80, liner ID = 4.892" 110,923 I I 11,376 H41/2" 'X'landing nipple,ID= 3.813" I 11,396 H Baker 7 5/8" X 4 1/2" S-3 pkr 11,418 H4 1/2" 'X' landing nipple, ID = 3.813" 11,438 H4 1/2" 'XN' landing nipple, ID = 3.725"1 Baker 7 5/8" X 4 1/2" HMC liner hngr, ZXP pkr, with TBS I 11,608 H7 5/8", 29.7#, L-80, BTC-Mcsg I 14,375 H PBTD I I 14,461 H4 1/2", 12.6#, L-80, IBT-M liner DATE REV BY COMMENTS DATE REV BY COMMENTS 09/08191 ORIGINAL COM PLETION 08/19/03 CMOfTLP DATUM MD CORRECTION 10/30/01 CTD SIDETRACK 09/14/03 BJMcUTL ECLIPSE PA TCH 11/22/02 CHlTLP CORRECTIONS 10/22/03 MJAfTLH MIN ID CORRECTION 09/28/02 MHlKAK GLV C/O 12/28/03 JBIvVPAG LNR ID CORRECTION 05/08/03 JJ/KAK PULL FISH 01/15/04 KSB/KK PULL PATCH; SET L TIP 07/30/03 ??/KAK PATCH & MIN ID CORRECTION 11/17/05 RP/dew 5-28B Wp08 PRUDHOE BAY UNrr WELL: 05-28B PERMrr No: API No: 50-029-22208-02 SEC 32, T11 N, R15E, 2431' SNL & 4220' WB. BP Exploration (Alaska) · I PRUDHOE BAY, PRUDHOE OIL 50 5 " 10 0.5 ( _ Ratio ( Mcf/bbl ) V\átsr Cut % 0.1 0.05 0.01 2001 Data e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc ::., - ;,I" STATE OF ALASKA REGEn/ED ALASKA OIL AND GAS CONSERVATION COMMISSION ., -~ REPORT OF SUNDRY WELL OPERATIONgAAR 2 5 200. 1. Operations Performed: Abandon 0 Alter CasingD Change Approved ProgramD 2. Operator SuspendD RepairWeliD Pull TubingD Operation Shutdown 0 Plug PerforationsO Perforate New Pool 0 4. Current Well Class: i'1::!,~¡:. Iii ./ F~"¡ ::;:",; (;11, -:!'1 <'~¡Dn Perforate 0 Waiver~p""t,,~.. [':"- Other !] Stimulate D Time ExtensionÓ' '... Re-enter Suspended Well 0 Pull Patch 5. Permit to Drill Number: 201-1950 Name: BP Exploration (Alaska), Inc. 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): Development [X] 70.00 8. Property Designation: ADL-0028326 11. Present Well Condition Summary: Stratigraphic D 9. Well Name and Number: 05-28A 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool ExploratoryD ServiceD 6. API Number 50-029-22208-01-00 Total Depth measured 12235 feet true vertical 8791.4 feet Effective Depth measured 12198 feet true vertical 8789.9 feet Plugs (measured) Junk (measured) None None Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 39 119 39.0 - 119.0 1490 470 Liner 1091 5-112" 17# 13Cr80 9837 - 10928 8113.4 - 8809.6 7740 6280 Liner 2363 2-3/8" 4.7# L-80 9872 - 12235 8140.3 - 8791.4 11200 11780 Production 10116 7-5/8" 29.7# L-80 34 - 10150 34.0 - 8355.7 6890 4790 Surface 3878 10-3/4" 45.5# J-55 38 - 3916 38.0 - 3533.5 3580 2090 Perforation depth: Measured depth: 10835 -11090, 11350 -11550,11660 -11745,11970 -12085,12160 -12185 True vertical depth: 8804.91 - 8809,8811.84 - 8809.07,8796.3 - 8794.34,8793.71 - 8784.06,8786.99 - 8789.19 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 3-1/2" 9.2# 13Cr80 @ 34 @ 2987 2987 9911 Packers & SSSV (type & measured depth): 3-1/2" Baker SB3-A 9 CR Packer 5-1/2" Baker Hydro Set Packer @ @ 9784 9837 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Representative Dailv Averaae Production or Iniection Data Gas-Met Water-Bbl Casing Pressure 9.5 2084 700 13 Prior to well operation: Subsequent to operation: Oil-Bbl 460 Tubing Pressure 261 Well Shut-In 100 100 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentŒ ServiceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D Oil [X] GasD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. SUndry Number or N/A if C.O. Exempt: N/A Daily Report of Well Operations, ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron 23~~ Title Production Technical Assistant Signature Form 10-404 Revised 12/2003 Phone 564-4657 ORIGINAL --Bf~ . Date 3/23/04 WI 3 .J IOU' ... ':i' 05-28A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 01/14/04 T/I/O=150/700/100 PUMP 20 BBLS CRUDE DOWN TBG TO ASSIST HES PULLING PATCH 01/14/04 PULLED 3-1/2 UPPER ECLIPSE PACKER & PATCH. 01114/04 T/I/O=10/800/50. IA FL FOR WIRE LINE). IA FL @ 300'. 01/15/04 PULLED LOWER WFD ECLIPSE PACKER @6632' SLM. SET L TTP @ 8951' SLM. (1-318" FN, 26" OAL, SIP=750 PSI) RDMO. 01/16/04 T/I/O=720/60010. (PRE LOAD). TBG FL @ 1770' (27 BBLS), IA FL @ SURFACE. 01/21/04 T/I/O 800/64010. LOAD TBG & IA WI 9.8 INHIBITED BRINE. (SECURE WELL, PC LEAK). SPEAR IN WI 5 BBLS METH FOLLOWED BY 110 BBLS 9.8 BRINE. 5 BBL DIESEL CAP DOWN TBG. SPEAR IN WI 5 BBLS METH FOLLOWED BY 9.8 BRINE WI 5 BBL DIESEL CAP DOWN IA. RDMOL FINAL WHP'S 100/75/0. 01/23/04 TIO= 100/100/50. WELL SI. MONITOR WHP'S. (POST BRINE LOAD). FLUIDS PUMPED BBLS 20 10 10 304 344 Crude Methanal Diesel 9.8 Brine TOTAL Page 1 ( STATE OF ALASKA (' ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Development Œ] Stratigraphic D 9. Well Name and Number: 05-28A 10. Field/Pool(s): Prudhoe Bay Field 1 Prudhoe Oil Pool 1. Operations Performed: Abandon D Alter Casing 0 Change Approved Program 0 2. Operator Suspend D Repair Well[&] Pull TubingD Operation Shutdown D Plug Perforations D Perforate New Pool D 4. Current Well Class: Name: BP Exploration (Alaska), Inc. 3. Address: P.o. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 70.00 8. Property Designation: ADL-0028326 11. Present Well Condition Summary: Total Depth measured 12235 feet true vertical 8791.4 feet Plugs (measured) Junk (measured) Effective Depth measured 12198 feet true vertical 8789.9 feet Perforate D WaiverD Stimulate 0 Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: 201-1950 OtherD Exploratory 0 Service 0 6. API Number 50-029-22208-01-00 None None Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 39 119 39.0 119.0 1490 470 Liner 1091 5-1/2" 17# 13Cr80 9837 - 10928 8113.4 - 8809.6 7740 6280 Liner 2363 2-3/8" 4.7# L-80 9872 - 12235 8140.3 - 8791.4 11200 11780 Production 10116 7-5/8" 29.7# L-80 34 10150 34.0 8355.7 6890 4790 Surface 3878 10-3/4" 45.5# J-55 38 - 3916 38.0 - 3533.5 3580 2090 Perforation depth: Measured depth: 10835 -11090,11350 -11550,11660 -11745 True vertical depth: 8804.91 - 8809, 8811.84 - 8809.07, 8796.3 - 8794.34 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 @ 34 3-1/2" 9.2# 13Cr80 @ 2987 3-1/2" Baker SB3-A 9 CR Packer 3-1/2" Eclipse Patch Packer 3-1/2" Eclipse Patch Packer 5-1/2" Baker Hydro Set Packer Packers & SSSV (type & measured depth): 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 2987 9911 VEO @ 9784 RECE\ @ 6636 @ 6663 JAN 2 1 2004 @ 9837 Maska , ~nthOfage mì'\\SS\on Reoresentative Dailv Averaae Production or Iniection Data Prior to well operation: Subsequent to operation: Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 84 1.8 383 600 1702 371 7.7 1698 680 303 14. Attachments: 15. Well Class after proposed work: Exploratory 0 Service D DevelopmentŒ] 16. Well Status after proposed work: Operational Shutdown 0 OilŒ] GasD WAG 0 GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or NIA if C.O. Exempt: N/A Copies of Logs and Surveys run- Daily Report of Well Operations. ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron C~ Signature 1/20104 Form 1 0-404 Revised 12/2003 Title Production Technical Assistant Date RBDMS BFL JAM 2 (::; 2004 { ( 05-28A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 08/31/03 Freeze protect tubing and flowline. 09/02/03 TIO= 440/540/120. T x IA x OA FLs for FB. TIO FLs @ surface. 09/03/03 T/I/0=440nOO/540. Load & Kill to (Secure Problem Well). MIRU Dowell Held PJSM. PT line to 3500 psi. Start down with 10 bbl meth spear follow by 150 bbls 1 % KCL at 3 BPM for the first 114 bbls then increased the rate to 5 bpm for the remainder of the KCL. Pumped 10 bbls 40000 LSRV FLO-PRO, 21 bbls 40000 LSRV FLO-PRO w/50 ppb zone 2 safe carb graded CAC03 (1000#), and 10 bbls 40000 LSRV FLO-PRO spacer. Displace FLO-PRO to the perfs with 35 bbls KCL and 38 bbls crude. Bumped pressure up to 1000 psi 3 times the pressure would fall off to flow line pressure. Wing valve is leaking (Grease crew serviced it before the pump job). There's 5 bbls of FLO-PRO w/CAC03 behind pipe, 5 bbls across perfs and 11 bbls above the perfs, plus 10 bbls neet FLO-PRO. R/D. Final WHP's = 560/700/540. 09/04/03 T/I/0=540/720/120. Monitor WHP's (post L & K). 09/08/03 PULL UPPER 3 1/2in ECLIPSE PATCH ASSEMBLY 281 LONG ( RUBBER ELEMENTS LOOK GOOD) CURRENTLY SETTING UP TO PULL LOWER PATCH ASSEMBLY 09/09/03 SET 3 1/2in ECLIPSE PULLING TOOL @ 6614' SLM. MAKE 4 RUNS TO PULL. NO MOVEMENT. LRS PUMPED TOTAL OF 68 BBLS OF DIESEL DOWN TBG. MAKE 2 MORE RUNS W /SAME (STILL NO MOVEMENT) 09/09/03 TI0=750/725/125 Pump 68 bbls of 180* F diesel down Tbg to displace thick fluid from 6626 feet to assist S/L in fishing eclipse patch. 09/10/03 MADE SIX RUNS W/ .125 WIRE IN ATTEMPT TO PULL LOWER PACKER OF PATCH @ 66151SLM APPEARED TO MOVE UP TO 6601' SLM (TOTAL JARRING TIME TODAY WAS 7 HOURS AND 35 MIN W/ .125 WIRE) -- SWITCH OVER TO BRAIDED LINE -- MAKE 1 RUN TO 6568' BLM. JAR UP FOR 2 HOURS. 09/10/03 MADE SIX RUNS W/ .125 WIRE IN ATTEMPT TO PULL LOWER PACKER OF PATCH @ 6615'SLM APPEARED TO MOVE UP TO 6601' SLM (TOTAL JARRING TIME TODAY WAS 7 HOURS AND 35 MIN W/ .125 WIRE) -- SWITCH OVER TO BRAIDED LINE -- MAKE 1 RUN TO 65681 BLM. JAR UP FOR 2 HOURS. 09/11/03 PULLED LOWER PACKER OF PATCH FROM 65621 BLM ( MISSING 1 FEMALE BACKUP RUBBER ELEMENT / 2.82 OD X 3/4in THICK LOOKS LIKE DONUT) DRIFTED DOWN AND TAGGED DEPLOYMENT SLEEVE @ 9847 AMS / BLM W/2.7 CENT, 21 STEM, AND 3 PRONG WIRE GRAB (DID NOT RECOVER FEMALE BACKUP RUBBER ELEMENT). 09/13/03 T/I/O = 880/740/0+ temp = S/I. Tubing and IA FLs for patch. Tubing FL @ 130' (2 BBLs). IA FL @ surface. 09/14/03 SET 3.5in ECLIPSE PATCH @ 6636-6667' TO REPAIR LEAK @ 6647'. CORRELATED TO SWS LEAK DETECT LOG DATED 11-DEC-2002. MIN ID = 1.75in OAL = 33.76'. PATCH CAN BE FISHED WITH 3.5in ECLIPSE RETRIEVAL TOOL IF NECESSARY. 09/20/03 CTU #5 N2 lift. RIH with 2in JSN to 65501 while pumping N2 @ 550SCF/Min. and flowing well to system. Attempted to flow well to test separator but well was slugging hard had to be diverted to Tiger Tank while continuing to lift w/N2 and PUH to 55001. Worked back down to 6400' ctmd and unloaded well while monitoring wc%. Could not flos well to station for test due to slugging and system pressure, continued to flow to the tiger tank. Well lifts good from 64001 @ 550 scf/min at approx 1580 to 1890 blpd w/sample bottle water cuts of 85% to 95%. Attempted to flow fthrough the test separator but unable to control the level. Page 1 (' '~ ~ 05-28A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 09/21/03 CTU #5 N2 lift -Continued- Flowed back -1300 to 1400 bb 's water W /trace amounts of oil in samples. No indication of formation gas at approximately 1800 bpd. Flow well to tiger tank until! dead. Freeze protect tbg to 2500' w/crude. Freeze protect FL with 5 bbls meth & 43 bbl crude. FLUIDS PUMPED BBLS 396 Crude 15 Methonal 185 1 % KCL 20 Neet Flo-Pro 21 40000 Isrv Flo-Pro 50 ppb zone 2 safr qrade Garb CaCO3 (1000#) 8650 Gal N2 50 60/40 Methonal 9337 TOTAL Page 2 ~' ( TREE= FMC UL lRA SLIM I-DLE WB..LHEAO = Frvc A Crl.Ll\ TOR = BAKER C KB. ELEV = 70' BF. ELEV = NA. KOP= 1300' Max Ange = 99 @ 11613' Datum MO = NA. OatumTVO = 8800' SS 05-28A SAÆTY NOTES: 4-1/2" & 3-1/2" CHROME TBG & 5-112" CHROMELNR. W ELL ANGLE > 700 @ 10735' & > 90° @ 11017'. 8 2238' 4-1/2" TBG,12.6#, 13-CR. .0152 bpf, 10 = 3.958" 10-3/4" CSG, 45.5#. J-55, 10 = 9.950" 3896' 2985' 2987' ST ND TVO 1 3516 3140 2 5984 5119 3 7723 6473 4 8706 7211 5 9255 7601 6 9674 7918 Minimum ID = 1.75" @ 6636' 3-1/2" ECLIPSE PATCH 17-5/8"X 5-1/2" BKRLNR HGR I 1 TOP OF 2-318" LNR, 4.7#, 10 = 1.995" I 9899' 9911' 9896' 9837' 9872' 6636' - 6667' 9784' 9882' 3-1/2"lBG, 9.2#, 13-CR-80, .0087 bpf t 10 = 2.992" 9910' 17-5/8" CSG, 29.7#, L-80, 10 = 6.875" I 10150' . 5-1/2" LNR MILLOUT WINOOW 10565' - 10570' (OFF GMT RAMI=? PERFORATION SUMMARY REF LOG: SWS M8\i10RY CNLlGRlCCL ON 10/29/01 ANGLE AT TOP ÆRF: 85 @ 10835' Note: Refer to Production DB for historical perf data SIZE SR= INTERV A L Opn/Sqz DATE 1-11/16" 4 10835 - 11090 a 10/28/01 1-11116" 4 11350-11550 0 10/28/01 1-11/16" 4 11660 - 11745 0 10/28/01 1-11116" 4 11970 - 12085 0 10/28/01 1-11116" 4 12160 - 12185 a 10/28/01 4-1/2" OllS I-RQ SSSV NIP, 10 = 3.813" 4-1/2" X 3-1/2" XO, 10 = 2.992" GAS LFT MA.NORELS OEV TYÆ VLV LATCH 36 FMI-D OMY RK 37 FMI-D OMY RK 41 FMI-D OMY RK 44 FMI-D OMY RK 43 FMI-D OMY RK 40 FMI-D OMY RKP PORT DA 1£ 0 09/28102 0 09/28102 0 09/28102 0 09/28/02 0 09/28/02 0 09/28/02 3-1/2" EO-IPSE PA TCH (09/14/03),10 = 1.75" -17-5/8" X 3-1/2" BAKERSB-3A PKR I 2.70" BKR DEPLOYMENT SL V, 10 = 2.25" 3-1/2" OllS XN NIP, MILLED TO 2.80" 10 3-1/2" WLEG (SOS) 1-1 ELMO TT LOGGBJ 09122/91 I 15-1/2" LNR, 17#, 13-CR-80, D = 4.892" I 10923' 2-3/8" LNR, 4.7#, L-80, .0039 bpf, 10 = 1.920" -î 12235' 1 DATE REV BY COMMENTS DATE REV BY COMM8\JTS 09/08191 ORIGINAL COMPLEfION 07/30/03 ??/KAK PA TCH & MIN D CORREcrlON 10/30/01 CTD SIDEfRACK 08/19/03 GMO/TLP OA TUM MO CORRECllON 07/18/01 RN/KA K CORRECllO NS 09/14/03 BJMcLlTLF ECLIPSE PATCH 11/22/02 CH/TLP CORRECllO NS 10/22/03 MJA/TLH MIN 10 CORREcrlON 09/28/02 MH/KA K GLV 00 12/28/03 JBM'PAG LNR 10 CORRECTON 05/08/03 JJ/KAK PUlL FISH PRUDHOE BA Y UNrr WB..L: 05-28A ÆRMIT No: 2011950 API No: 50-029-22208-01 SEC32, T11N, R15E, 2431' SNL& 4220' WEL BP Exploration (Alaska) ) \\ rJ ~ \j ;{,o~} ~ DATA SUBMITTAL COMPLIANCE REPORT 10/22/2003 SflY..L t It ttJ~~ ( API No. 50-029-22208-01-00 Permit to Drill 2011950 Well Name/No. PRUDHOE BAY UNIT 05-28A Operator BP EXPLORATION (ALASKA) INC MD 12235 ..- Completion Date 10/30/2001 ,.-- 1-01L Current Status 1-01L UIC N Completion Status TVD 8791 "...- ---- REQUIRED INFORMATION Mud Log No Samples No Directional Survey ~ 'f~ , DATA INFORMATION (data taken from Logs Portion of Master Well Data Maint) Types Electric or Other Logs Run: Well Log Information: --~, Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ~/ Pressure 1k69 jftD C I t;o ~~~ I Log Log Run Interval Scale Media No Start Stop 1 Blu 1 20 9450 1 Blu 1 20 9450 1 9730 1 20 1 10468 1 20 1 10468 1 20 Case 12/20/2002 t> 1- Gradiometer A567 Neutron OH/ CH Received Comments Case 12/20/2002 ~ ¡..- Case 12/20/2002 ~ v 12190 Case 1217/2001 9450 Case 12/20/2002" L- Spinner Blu 1 ~ ' /1'0724 12235 Open 4/4/2002 Blu 9450 Case 12/20/2002 'D t..- 1 D ~58 11970 Open 4/18/2002 1 Blu 9450 Well Cores/Samples Information: Name InterVal Start Stop Sample Set Number Comments ~~-~" Sent Received ADDITIONAL INFORMATION Well Cored? Y / N Chips Received? Analysis Received? Daily History Received? Y/N @N Y/N Formation Tops Y/N Comments: ¡V,(j r- ,'^- 1\ t1 b vV\..( M. ú/J c.-- 2. It ~ r1:;- ~ l .s; i J "'^- I ß L-- (J) a... MD ¿IU ~ t=.'1 "-./ 13 L- ú> 1'1... MJJ $ Iv Da tßJ ~~L / f\.o.-! ß L-- DATA SUBMITTAL COMPLIANCE REPORT 1 0/22/2003 Permit to Drill 2011950 Well Name/No. PRUDHOE BAY UNIT 05-28A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22208-01-00 Compliance Reviewed By: ~Pletion Date 10/30/2001 Completion Status 1-01L Current Status 1-01L UIC N Date: ~ ttJ (} 1/ ~)- MD 12235 ND 8791 ~"'... -", 1 0/31/03 Scblumbepgep NO. 3017 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job# Log Description Date Blueline Color Prints .-=-~~, CD H-19B ~ ~ ~ ....{"þ, lJ MEM PPROF & IPROF LOG 09/29/03 1 H-27A ð~~ -('~J.~ Of MEM PPROF & IPROF LOG 10/01/07 1 D.S. 1-10 J '7¡.p:;-~ 1-.1 ~ PSP LDL 10/25/03 1 0.5.15-23 . q t - ~ ~ RST GRAVEL PACK LOG 07/10/03 1 JX-O2A ¡\..' '- '- 1 c:.,~ LDL 07/18/03 1 0.5. 14-23 ~ ,;; ,-{ YX ~ PSP LDL 10/24/03 1 P1-17 ...." -::~ -("),Þ') ( PROD PROFILE WIDEFT/GHOST 10/26/03 1 D.S. 4-42 Ie - L..l-<" LDL 10/22/03 1 GNI-02 \ (". .;; ~,."')/~.r~ TEMP PROFILElSBHP SURVEY 10/08/03 1 D.S.6-16 i r- -ê)~~ LDL 10/12/07 1 P1-18A t- """~ -n Tt"o PROD PROFILE WIDEFT 10/15/07 1 D.S.5-28A r ..... tÖ t:=- LDL 10/14/03 1 D.S. 12-20 l5;!Q -ICï LDL 10/21/03 1 2-32/SN-O3 l '-t () '" I 9 LDL 10/25/07 1 Z-39 ~-(""\ h< 10563105 RST-SIGMA 09/22/03 1 1J~~x ..-...~ - -~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center lR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 f~~. L~: (:: F i 'J t= 0 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Date Delivered: NOV 0:3 ?OC-:j Received b~- ~ .~;V'\ C . \ C"\ ~ f1' /Vî , ;':,¡G~;~ð J;¡ Ù C~~~~ ;~cn~.j:Jmm!S~Oíi AnC110n:~ge ~\)ÿ\~~ ( WELL LOG TRANSMITTAL ~Ol' tQS ( ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7lhStreet Suite # 700 Anchorage. Alaska 99501 RE: Distribution - Final Print( s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM FILM COLOR Open Hole 1 1 1 Res. Eva!. CH 1 1 1 05-28 08-30-03 Mech. CH J ~!;j-g , Caliper Survey Signed: ~, """"'- """ ~f3')\ ~I",,~ ,"_CJ ~~ ç'~ s:~ \~\ Date: Print Name: 0,.,.-,- (\ ", ","'¡'\,'., /' ".., .' '\",1 ""~.iL.'" Ij,;di.,;~;:;~ ;,.L ' " ':"~'¡':,'~:I¡(\¡"li "i j,\(",;ß ',.,,' PRoAcTivE DiAGNOSTic SERvicES, INC., PO Box 1 }b9 STAffoRd IX 77477 Phone:(281) 565-9085 Fax:(281) 565-1369 E-mail: pds@memorylog.com Website: www.memorylog.com "'.\~~~ 'Y\ ~ (' WELL LOG TRANSMITT AL ð-O\ -- \ C(5 ( ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7tnStreet Suite # 700 Anchorage. Alaska 99501 RE: Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM FILM COLOR Open Hole 1 1 1 Res. Eva!. CH 1 1 1 Os 05-28 8-23-03 Mech. CH 1 j ~ 1-1""13 Caliper Survey Signed: "",,"0 """ "'" --"'-'~ ~ ~,\ \..V~ \~ \" 9- ~ ~ ~ /~~ f: ',j !',; "ce". !:":'-",¡, ::1 t" fl"""d" Date: Print Name: O"""-i'J"',¡',""",~"J, , :' ¡ . I" \ I'" ')', ':' '" .l i:,... , ,) £.." 'j ,.) ',i ':"'t"":'"i,¡";!"\,ìr""¡"',,~' .,..','",,;,. ":IJ,)ì,;\ti~J\i PRoAcTivE DiAGNOSTic SERVicES, INC., PO Box 1 }b9 STAffoRd TX 77477 Phone:(281) 565-9085 Fax:(281) 565-1369 E-mail: pds@memorylog.com Website: www.memorylog.com \' "'\~~\~ ~\ ~ Sc~IUllbe,gep Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Well D.S. 5-28A L 1-15 GNI-03 NK-62 4-08/P-27 2-62/Q-17 2-321SN-03 D-13A 1-57/R-23 Job# Log Description 23402 - 23281 LDL RST-GRAVEL PACK SHUT-IN TEMP SURVEY PROD PROFILE/DEFT INJECTION PROFILE LDL ill MCNL RST -SIGMA PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: CE\\JED AI 1;-- r." t);,,'; , 'i" .'" ¡ "', . .J\J L, L'_")'.~' \,..'. ~ ""-- -- ~ fÚ.rSKft , .. ~ú¡nr¡¡¡a~on !-,¡nj¡Dn~gø Date 08/17/03 08/20/03 08/18/03 05/30/03 08/20/03 08/17/03 08/18/03 06/23/03 05/07/03 Blueline NO. 2952 Company: 08/27/03 State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Prints 1 1 1 1 1 1 1 1 1 ~ CD 1 1 . Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Received ~ C\.)..IU~~ 0 ~ 12/18/02 Schlumbepgep NO. 2625 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TIN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay -"", Well Job# Log Description Date Blueline Sepia Color Prints CD D.S. 15-27 1'1;) - OOcQ LEAK DETECTION LOG 12/08/02 1 D.S. 7-09 i ,'1-0 ttn LEAK DETECTION LOG 12/12/02 1 D.S. 5-28A --=-- n,- J C 5 LEAK DETECTION LOG 12/11/02 1 D.S. 16-20 I :í~ -:J~ ~S PRODUCTION PROFILE 12/04/02 1 W-37 A .~~ - J4v 22532 MCNL 12/04102 1 1 W-37A 22531 ARC3 DATA 11/02/02 1 W-37A 22531 MD VISION RESISTIVITY 11/02/02 1 W-37A ...... / 22531 TVD VISION RESISTIVITY 11/02/02 1 --. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 D'C 2 {\ r:(\f¡? r:.. ...J Lvv,- Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATIN: Beth D~.=C' -i,"".ï::.""""'O" - ,< ~ - ~ ;t I ¡j '\~ -!rik-~ ~ ~:i Date Delivered: it! ~~ -,,:¿;;:, f~'.r,.~ {"t. 0'." '-.-mlml'<tetU\n ¡..:..:a.,;.:->.a Vi. ;... \;Jç¡;:¡ yOh~. \..-\,;í uu vglYU An ch crag e (" ( llomHs.,.nm»lI-¡ , ""',,"',.,,'" , -----...-------..,-"...."'.,......, '?'F~;~:':::"'...- , " , t~"~r""~: ., ~, To: State of Alaska, Alaska Oil & Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 ,~~.~ ~" ',.... :-~...~ :;",;'"- ¡ ~ i.: 'it, ¡ ¡ H~î ~ ~ i~ E Canada GEOSciences Centre" j ¡ H ~¡, _."'~ ~ ¡ ~:~~, ¡ j !H~: ~ : ~~ :, =: , : ì:S:: ~ ; ¡hï: ~. = :~i """~. ~ I if ~ ii' i ; ~n!, ¡ ¡ jHi¡ 1 ;. i~ W . ~ , ~. .., ¡ ¡ !Hì¡ i ; ~H~I 1 : ~~ ;1: _w"'-, ! . ,'=¡ ~ : ;p. ! ~ ~~ Ui \ : jX ,tll ! ¡ ~~,: ~~l ! ¡ æH~1 ! 1 i~ ~~: ,~~. ~: ':.::: I :::". ~ ,~. '!i ¡ §LiE$ ,.: 'I :::-"'_"'~;:':;:"~;': "::""'::'[ II a, "...-;".. '~~h_!;::%;: ':--:.: , ",,'.,,' ,-. ..... u ., -. BAKER HUGHES Transmittal Form Baker Atlas Attention: Lisa Weepie Reference: BP Exploration, Inc. 18-32A Prudhoe Bay Unit~O)-IO1 BP Exploration, Inc. H-07 A Prudhoe Bay Unit du o-/à '6 BP Exploration, Inc,15"'41~:pBll:)l1.ldhQ~,BayUnit aOj',-Jcl L.ç; BP Exploration, Inc.4..41.Â]IJB~f>rnçll1()e'BélyUnìt~QQ-L0¡5 BP Exploration, Inc.O51~~B' ,PrUdhQ~]3ây:UnitQO)"'I"~O BP Exploration, Inc. 05-28A 'PrudhoeE3a.yUnitaOI-Icq5 .', ,. ..-. . ,. . .. ..- " .... . .. .-. . n- . .. , .. Contains the following For EaçhOfThe Above Wells: ¡ , iLJ',',',"'-,""',",',' : II ' " '¡ , , i",~ ! r .,. - '. :..:....:...':'.-:" -:-:::.:..:...:.:J 1 - LAS Fonnat disk ','~"',.",]j'l "..", , ;!"'ll4':YlffiS,",': ',",' . ",' ",',:",",'" "',"',",' t îi,;r~~~ W~~~.~J,} pp~r . ."," .....'. ,_.. ...- ---_..-- --- --- -- -- -- ---_.- ---- ,--------- ~~"'-"",,::,,- ----.- ._--- ---.------.. ,,----- ._----.----,-_. --- .-. --- -.. - ,.....- --- - --" . . .. ." . . -------' --..".------ ,-' ~:"'::':"'::."-"n__......._':_, :, ~'." ,...:>. -.... ~)::;>=~ ~7 -:-~::=== r':-cro-- .. -'-.------:- '::.J :':' :. .-":,-.., :.'. :-i:"-:-:-- :~-~7.-:-:-',--:-:--- ! .~::.... I. -..: :"'..:.:::::'. "'. :_,....,:- . .._--._---~..._-_.. .':' '.' ::': : ;.,,:: :,,: : - .. . .' '.'" ,./'::.. í, : ) '.' ---- .----.,- -.----:-- :--:--.,,:---- ......-... . - :'.~'l:"::::" :=.:::::.::..:~-~::~: RECEIVED ~¿: : ..:-;/~:~= Date: :-:_~~~-:: ¡ :.~~===::-:-},-:::= L':J' ~ ~~,~~~ . .: ~ \ 0 . r LOO2 ~i~~ ;_~n"__.':~f(:: PLEASE ACKNOWLEDGE RECEIPT BY SIGNIN~.(fIJd&\~]j~&ftissiÓn~"': "~~::-7'.n.: OR FAXING YOUR COpy Anchorage fi!:.;:~'~i::i:¡j¡ ,,', FAX: (403) 537-3767 t~:~,!.:,'.:;~i:,;¡:',ll,:",,: ~-_:::,.!::,!._, ~,""":',i ~-"~~--' ~ Sent By: Josef Berg Received By: è~ ~~1 Date: Aprill, 2002 :-:-:::-:::-:-.: . -- -..--.. _:.... ...., ;~ :~.~~ ".'-- '-'---- Baker Atlas #1300, 401-9th Ave. S.W, Calgary, Albert a, Canada T2P 3C5 Direct: (403) 537-3752 FAX: (403) 537-3767 ;:....:::.,.,~:,,~-~-~..:/;.::.i:~ ':::::;~;'~~j ¡ ; i..,... r ! - .-" 12/05/01 ScblllDbepger NO. 1663 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: State of Alaska Alaska Oil & Gas Cons Comm Aftn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay,Niakuk .~ ""-" Well Job # Log Description Date Blueline Sepia Color Prints CD ~. D.S.11-35 ICKl---oloS INJECTION PROFILE 11/22/01 1 1 N-17 /q~ -- CO9 21460 RST-SIGMA 10/23/01 1 1 1 D.S. 1-Ð3A I ( , c:. - ;;;,)oll 21194 RST -SIGMA 04/05/01 1 1 1 D.S. 5-28A a ~ 1- q S 21470 MCNL 10/29/01 1 1 1 D.S.11-37 141.0 -/ít.j 21481 RST-SIGMA 11/09/01 1 1 1 D.S.15-32A ,..::}f")I- /Q'L/ 21479 MCNL 11/07/01 1 1 1 D.S.15-44 I qiD - 110 21469 RST-SIGMA 10/25/01 1 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc, Petrotectnical Data Center LR2- 1 900 E. Benson Blvd. Anchorage. Alaska 99508 RECEIVED Schlumberger GeoQuest 3940 Arctic Blvd. Suite 300 Anchorage. AK 99503-5711 ATTN: Sherrie Received b~ ( ~ Date Delivered: DFC 0 7 2001 . . a . Anchorage (' STATE OF ALASKA (' ALASKA OIL AND GAS CONSERVATION COMMI~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well IHI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 201-195 3. Address 8. API Number P.O. Box 196612, Anchorage, Alaska ... 50- 029-22208-01 99519-6612 '¡DCA'" ," 4. Location of well at surface :------- '" "', ',--, Vè 9. Unit or Lease Name 2431' SNL, 4220' WEL, SEC. 32, T11 N, R15E, UM -i: ," C',~i ' ' , .'-'J-i .:'~~ '1;;, Prudhoe Bay Unit At top of productive interval " ~...u~ : J~3l:~Ç¿t f.:¡; ,'- , 3039' NSL, 5000' WEL, SEC. 29, T11 N, R15E, UM ;, D., . '-"",?4..~",,( 1 O. Well Number At total depth i ---~.Ab.._.__", ~"~"_~-,~,---"",-"" 05-28A 43201 NSL, 553' WEL, SEC. 30, T11 N, R15E, UM .. - , """c-,-----.- 11. Field and Pool 5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool RKB = 70' ADL 028326 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 15. Water depth, if offshore 16. No. of Completions 10/19/2001 10/27/2001 10/30/2001 N/ A MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 12235 8791 FT 12198 8790 FT IHI Yes ONo (Nipple) 2238' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, Memory CNl, CCl 23. CASING. LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 11 Yards Arcticset 10-3/4" 47# J-55 Surface 3916' 13-1/2" 1265 sx CS III, 350 sx 'G', Top Job: 90 sx CS II 7-5/8" 29# l-80 Surface 10150' 9-7/8" 815 sx Class 'GI 5-1/2" 17# 13Cr80 9837' 10565' 6-3/4" 95 sx Class 'G' 2-3/8" 4;7# l-80 9872' 12235' 3" 113 sx Class 'G' 24. Perforations open to Production (MD+ TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 1.56" Gun Diameter, 4 spf 4-1/2", 12.6#, 13Cr80 2987' MD TVD MD TVD 3-1/2",9.2#, 13Cr80 9911' 9784' 10835' - 110901 8805' - 88091 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 113501 - 11550' 8812' - 88091 11660' - 11745' 8796' - 87941 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 119701 - 12085' 8794' - 8784' 2000' Freeze Protected with MeOH 121601 - 121851 8787' - 8789' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) November 7, 2001 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBl GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED Oll-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CaRR) Press. 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit conFt~~CEIVED DEC 0 6 fOOt Alaska Oil & Gas Coos. Commission Anchorage Form 10-407 Rev. 07-01-80 0 R \ G \ NA l}BDMS BFl DEC I n 2001 Submit In Duplicate ~~ ( ( 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GaR, and time of each phase. 21TS 10614' 87191 Zone 1 B 10580' 86941 Base of Sadlerochit 11 000' 88131 R.ECEIVED DEC 0 (; 2001 Alaska Oil & Gas Cons. Commission Anchorage 31. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the fore oing is true and correct to the best of my knowledge Signed Terrie Hubble Title Technical Assistant Date \~"CJb.D 05-28A Well Number 201-195 Permit No. / A roval No. Prepared By Name/Number: Terrie Hubble, 564-4628 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'nonel. Form 10-407 Rev. 07-01-80 OR\G\NAL (' (, BP EXPLORATION Page 1 of 10 Operations Summary Report Legal Well Name: 05-28 Common Well Name: 05-28A Spud Date: 10/17/2001 Event Name: REENTER+COMPLETE Start: 10/17/2001 End: Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 10/17/2001 07:00 - 09:30 2.50 RIGU P PRE Move rig from 5-23 and spot over 5-28A. Lay berm and spot cuttings tank and tiger tank. 09:30 - 11 :30 2.00 BOPSUF P DECOMP ACCEPT RIG ON DS 5-28A AT 09:30 HRS ON 10/17/2001. NU BOPE. 11 :30 - 18:30 7.00 BOPSUF P DECOMP Test BOP and associated equipment to 300/3500 psi. Test witnessed by AOGCC Rep Lou Grimaldi. 18:30 - 20:15 1.75 STWHIP P WEXIT C/O CT packoff. Weld on new CTC. 20:15-21:00 0.75 STWHIP P WEXIT M/U BHA #1. 1.75 deg motor, used parabolic 2.79" diamond mill for pilot hole 21 :00 - 23:40 2.67 STWHIP P WEXIT RIH. Shallow test tools at 2000 ft. RIH. 23:40 - 00:00 0.33 STWHIP P WEXIT Tag XN nipple at 9898 ft. Correct to 9900 ft. [+2 ft CTD]. Mill out XN Nipple with very light WOB. 500# WOB. 1.6 BPM, 1800psi. 10/18/2001 00:00 - 01 :00 1.00 STWHIP P WEXIT Mill out XN nipple at 9900 ft with 2.79" mill. Very light WOB. Back ream and ream down. 01:00 - 02:10 1.17 STWHIP P WEXIT Tied-in with GR to BHCS/GR at 10375 ft. [-13 FT CTD]. 02:10 - 02:30 0.33 STWHIP P WEXIT Orient TF to 130R. RIH and tag cement top at 10,480 ft. 02:30 - 05:30 3.00 STWHIP P WEXIT Mill Pilot hole in cement at 130R TF. ROP = 30 FPH. 1700 # WOB. 1.8 bpm. Mill Pilot hole to 10559 ft. 05:30 - 05:45 0.25 STWHIP P WEXIT Orient TF to 60L 05:45 - 06: 15 0.50 STWHIP P WEXIT . Mill ramp at 60L. Hard cement, 25 FPH. Mill ramp to 10,565 ft. Flag CT at 10,400 ft EOP. 06:15 - 08:15 2.00 STWHIP P WEXIT POOH for 2.5 deg fixed bend motor and 2.80" new diamond window mill. 08:15 -10:30 2.25 STWHIP P WEXIT RIH with window milling BHA #2. 10:30 -11:15 0.75 STWHIP P WEXIT Tie-in with GR, ( flag, -6' ) ( gamma +3' ) ( -3' net correction on CTD) 11:15-11:30 0.25 STWHIP P WEXIT Orient TF to 13L. Tag up at 10565'. Flag pipe. PUH 11. \ 11 :30 - 19:20 7.83 STWHIP P WEXIT Start time milling window at 10564' at 11 :30 hrs. 1.8/1.8 bpm. ~ 2500 psi. 20L. At 10565' at 16:03 hrs. At 10566' at 19:19 hrs. 1.7/1.7 bpm. 2560 psi. TF 348 deg. 19:20 - 22:10 2.83 STWHIP P WEXIT ,Cont milling window per schedule. ,At 10567' at 21 :02 hrs. 1.7/1.7 bpm. 2780 psi. TF 336 deg. At 10568' at 22:10 hrs. 1.7/1.7 bpm 2750 psi. TF 326 deg. 22:10 - 23:00 0.83 STWHIP P WEXIT Incr milling speed. Incr pressure to 2850 psi & WOB to 5000#. Cont milling down to 10569.5 ft. Bottom of window. Window = 10,565 - 10,569.5 ft. 23:00 - 00:00 1.00 STWHIP P WEXIT .. Mill formation at 10 fph from 10569.5 ft to 10,573 ft. Slow ROP. 10/19/2001 00:00 - 01 :00 1.00 STWHIP P WEXIT Mill formation to 10,580 ft. 60L TF. Flag CT at 10,400 ft EOP. 01 :00 - 02:45 1.75 STWHIP P WEXIT POOH for taper mill to dress window. 02:45 - 03:30 0.75 STWHIP P WEXIT M/U 1.75 deg motor and 2.78" taper mill. C/O batteries. Window mill out of hole at 2.80" gauge. 03:30 - 06:00 2.50 STWHIP P WEXIT RIH with BHA #3. Shallow test. RIH. 06:00 - 06:30 0.50 STWHIP P WEXIT Tied-in with BHCS/GR, [-3 ft CTD.] 06:30 - 07:30 1.00 STWHIP P WEXIT Orient TF to 30L. Work mill down thru window & work thru same. Had 3 stalls attempting to get through then able to mill down at 30-40 fph and exit window. 07:30 - 08:30 1.00 STWHIP P WEXIT Run thru window and clean out open hole to confirm out of window - OK. Make 3 back reaming passes at TF 30-60L. \ Printed: 11/5/2001 10:48:46 AM ( ( BP EXPLORATION Page 2 of 10 Operations Summary Report Legal Well Name: 05-28 Common Well Name: 05-28A Spud Date: 10/17/2001 Event Name: REENTER+COMPLETE Start: 10/17/2001 End: Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 10/19/2001 08:30 - 09:45 1.25 STWHIP P WEXIT Make 3 backreaming passes at approx 0 TF while starting to displace well to Flo-Pro. Continue with 3 passes at TF 30L. Make dry pass thru window - OK. Get Flo Pro around. 09:45 - 11: 15 1.50 STWHIP P WEXIT POH to PU drilling build BHA #4. 11: 15 - 11 :45 0.50 STWHIP P WEXIT Stand back injector. LD BHA #3. Mill OD worn down approx 0.01 inch to 2.77". 11 :45 - 12: 15 0.50 DRILL P PROD1 MU build BHA #4 with DPI 2.71IX3" SR933 bi-centre bit and 1.5 deg motor. MU injector. 12:15 -12:30 0.25 DRILL P PROD1 RIH. Shallow hole test MWD at 1000' - OK. 12:30 -14:35 2.08 DRILL P PROD1 Cont RIH with BHA #4 to 10459'. Correct to EOP flag at 10400' (-6'). 14:35-15:15 0.67 DRILL P PROD1 PUH & tie in to GR. GR sensor has locked up giving constant reading of 24 units only. Tool failure. Tool was giving GR readings during SHT. 15:15 -16:45 1.50 DRILL N DFAL PROD1 POH to change out GR probe #1. 16:45 - 17:45 1.00 DRILL N DFAL PROD1 Pull MWD package and swap GR probes. Surface test new system - OK. 17:45 - 20:30 2.75 DRILL N DFAL PROD1 RIH with build BHA #5 & bit #4 RR1 wI GR probe #2. Shallow test tools OK. RIH. 20:30 - 23:00 2.50 DRILL N DFAL PROD1 Log tie-in with GR. BHI computer problems, change out computers. tied-in with GR. [-2 ft CTD]. 23:00 - 23:30 0.50 DRILL N DFAL PROD1 Orient TF. 23:30 - 00:00 0.50 DRILL P PROD1 Drilling. TF = 50L, 1.7 bpm, 3100 psi. full returns. Drilled to 10,585 ft wlo GR signal. GR failed at very start of drilling. 10/20/2001 00:00 - 03:30 3.50 DRILL P PROD1 Drilling, TF = 40L, 1.7 bpm, 3100 psi, drilled to 10662 ft. Drilled ahead on first 80 ft of build section with no GR signal from BHI MWD. No back up tools presently available. 03:30 - 05:30 2.00 DRILL N DFAL PROD1 POOH to repair MWD tools. No GR signal. (GR Probe #2) 05:30 - 07:30 2.00 DRILL N DFAL PROD1 UO MWD tools. Check motor and bit. MU new directional package & check out GR probe #2. Tool checks out and no replacements on Slope (ETA 13:00 hrs today). MU BHA wI GR #2 probe. MU injector. 07:30 - 08:00 0.50 DRILL N DFAL PROD1 RIH & SHT tools at 1000'. No signal or readings from GR probe. Cycle pump - still no readings. 08:00 - 08:15 0.25 DRILL N DFAL PROD1 POH. 08:15 -12:00 3.75 DRILL N DFAL PROD1 Stand back injector. Troubleshoot MWD package. Try different probe configuration. No success. ETA for replacement GR package now 13:30 hrs via NAC cargo flight. Discovered indication of short in bottom GR connector not field repairable. 12:00 -15:30 3.50 DRILL N DFAL PROD1 Wait on replacement GR probe to arrive. General rig maintenance. 15:30 -16:00 0.50 DRILL N DFAL PROD1 MU and surface test new GR probe #3. MU BHA #6 w/DPI bi-centre bit 4 RR2 and 2.6 deg motor. 16:00-18:15 2.25 DRILL N DFAL PROD1 RIH wI BHA #6. Shallow hole test at 1000' - OK. All checked out with new probe. Ran extra I long shallow test. OK. Correct at 10400' EOP flag (-8.7'). 18:15 -19:00 0.75 DRILL N DFAL PROD1 Attempt to Tie in wI GR. Again no signal from GR probe. Unable to get signal. 19:00 - 20:30 1.50 DRILL N DFAL PROD1 POOH with failed GR probe #3. Shallow test at 2800 ft. GR not working. Printed: 11/5/2001 10:48:46 AM ( (' BP EXPLORATION Page 3 of 10 Operations Summary Report Legal Well Name: 05-28 Common Well Name: 05-28A Spud Date: 10/17/2001 Event Name: REENTER+COMPLETE Start: 10/17/2001 End: Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 10/20/2001 19:00 - 20:30 1.50 DRILL N DFAL PROD1 GR probe history: #1 probe failed at TD but works on bench. #2 probe had a shorted wire connection #3 probe being pulled now #4 probe on flight from Anc at 2130 hrs. tonight 20:30 - 22:15 1.75 DRILL N DFAL PROD1 C/O motor, bit and GR module. Left out MWD memory module, to see if it was affecting MWD signal. RIH with #4 GR probe. 22:15-00:00 1.75 DRILL N DFAL PROD1 RIH with BHA #7 & GR probe #4, 2.60 deg motor and new DPI bi-center bit #5. 10/21/2001 00:00 - 00:30 0.50 DRILL N DFAL PROD1 RIH with MWD BHA #7, GR probe #4 with 2.60 deg motor and bi-center bit. 00:30 - 01 :00 0.50 DRILL N DFAL PROD1 Tied-in with GR to BHCS/GR. [-13 ft CTD]. 01 :00 - 02:30 1.50 DRILL N DFAL PROD1 Log MAD pass of GR from 10645 - 10565 ft. 02:30 - 03:00 0.50 DRILL N DFAL PROD1 Orient TF. 03:00 - 05:00 2.00 DRILL P PROD1 Drilling, TF = 10L, 1.7 bpm, 3050 psi, full returns, Drilled to 10,735 ft. 05:00 - 05:45 0.75 DRILL P PROD1 Drilling, TF = 5L, 1.6 bpm, 3000 psi, full returns, Drilled to 10,773 ft. Finished build section. 05:45 - 07:30 1.75 DRILL P PROD1 POOH for lateral section. 07:30 - 08:00 0.50 DRILL P PROD1 Stand back injector. LD BHA #7. CO bit, adjust motor bend to 0.79 deg. MU same. Stab injector. 08:00 -10:15 2.25 DRILL P PROD1 RIH with BHA #8 - HTC STR WD bi centre bit #6, 0.79 deg motor. Shallow hole test at 1000' - OK. Cont RIH. Slight mud loss during trip in - approx 4 bbl/hr RIH at 90 fpm. Correct to EOP flag at 10300' EOP (-11'). 10: 15 - 11 :00 0.75 DRILL P PROD1 Log GR tie-in at 10375'. (Corr'n 0'). 11 :00 - 11 :45 0.75 DRILL P PROD1 RIH & thru window, no circ - no problem. RIH to 10773'. PUH and get clicks for 70-80L. 11:45 -13:30 1.75 DRILL P PROD1 Drill ahead: 10815'. 1.6/1.6 bpm 3400 psi. TF 77L. 50-60 fph ROP. Losses at zero since starting to drill ahead. Drill to 10860'. Starting to stack wt. 13:30 -13:45 0.25 DRILL P PROD1 100' short trip & back to bottom. 13:45 -15:20 1.58 DRILL P PROD1 Cont drilling ahead & land well at 8738' ss in Z1 a. 10910': 1.6/1.6 bpm. 3450 psi. TF 80L. 70-80 fph ROP. 15:20 - 15:40 0.33 DRILL P PROD1 Wiper trip to window to clean up hole - still stacking out when drilling. 15:40 - 16:45 1.08 DRILL P PROD1 Cont drilling ahead - wt transfer improved. Drill down to 10942'. Continue with wt transfer difficulties. 16:45 - 17:00 0.25 DRILL P PROD1 Pump 25 bbl new mud from pill pit while PUH slow. RIH to btm. 17:00 - 18:00 1.00 DRILL P PROD1 Start drilling again once new mud outside pipe. ROP increase to 100+ fph. Drill ahead to 10980'. Get 2 clicks. 11000': 1.7/1.7 bpm. 3450 psi. TF 32 deg L. ROP 70 fph. 18:00 -19:10 1.17 DRILL P PROD1 Drilling, TF = 90R, 1.6 bpm, 3000 psi, 90 deg incl. Drilled to 11 030 ft. 19:10 - 20:00 0.83 DRILL P PROD1 Wiper trip to window. 20:00 - 21 :00 1.00 DRILL P PROD1 Drilling, TF = 80R, 1.6 bpm, 3000 psi, 92 deg incl. Drilled to 11,078 ft. 21:00-21:15 0.25 DRILL P PROD1 SAFETY. FIRE DRILL IN BOILER ROOM. Personnel Printed: 11/5/2001 10:48:46 AM ( ( .- BP EXPLORATION Page 4 of 10 Operations Summary Report Legal Well Name: 05-28 Common Well Name: 05-28A Spud Date: 10/17/2001 Event Name: REENTER+COMPLETE Start: 10/17/2001 End: Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 10/21/2001 21:00-21:15 0.25 DRILL P PROD1 responded to boiler room. 21:15-23:50 2.58 DRILL P PROD1 Drilling, TF = 160R, 1.6 bpm, 3000 psi, 93 deg incl. Drilled to 11,179 ft. 23:50 - 00:00 0.17 DRILL P PROD1 Wiper trip to window. 10/22/2001 00:00 - 00:15 0.25 DRILL P PROD1 Wiper trip to window. 00:15 - 00:45 0.50 DRILL P PROD1 Tied-in with GR. [+1 ft CTD]. 00:45 - 01 :15 0.50 DRILL P PROD1 RIH to TD. 01:15 - 02:00 0.75 DRILL P PROD1 Orient TF 02:00 - 05:30 3.50 DRILL P PROD1 Drilling, Try to hold 88 deg incl. to stay in target Zone 1A sand. Swapped to new FloPro Lite mud. Stored old mud at MI plant for mud losses. 1.6/ 1.6 BPM, 3000 PSI, TF = 90R. Drilled to 11,294 ft. 05:30 - 06:30 1.00 DRILL P PROD1 Wiper trip to window. Clean hole. 06:30 - 08:45 2.25 DRILL P PROD1 Drill ahead: 113601: 1.6/1.6 BPM. TF 85L. ROP 90 FPH. Drill ahead to 11409'. 08:45 - 10:00 1.25 DRILL P PROD1 Wiper trip to window to clean up hole & improve wt transfer. 10:00 -10:30 0.50 DRILL P PROD1 Drill ahead to 11445'. 10:30 - 11: 15 0.75 DRILL P PROD1 Orient around for TF 90R. 11: 15 - 12:40 1.42 DRILL P PROD1 Drill ahead to 11543'. 12:40 -13:00 0.33 DRILL P PROD1 300' wiper trip. 13:00 -14:00 1.00 DRILL P PROD1 Drill ahead to 11605'. 1.8/1.8 bpm. 3350 psi. TF 155L. In graben and should be in 21 b or possibly upper 21a. 14:00 -15:30 1.50 DRILL P PROD1 Wiper trip to window & back to bottom. 15:30 -16:45 1.25 DRILL P PROD1 Drill ahead to 11685' trying to get angle down with 180 deg TF. Crossed fault #2 at 11618' est. 16:45 -17:30 0.75 DRILL P PROD1 Get clicks for 90-1 OOR. 17:30 -18:15 0.75 DRILL P PROD1 Drill ahead to 11703'. 18:15 -19:00 0.75 DRILL P PROD1 Orient around to 70-90R. 19:00 - 20:50 1.83 DRILL P PROD1 Drilling, TF = 85R, 1.6/1.6 bpm, 3100 psi. 86 deg incl. Drilled to 11737 ft. 20:50 - 21 :30 0.67 DRILL P PROD1 Wiper trip to window. 21 :30 - 22:30 1.00 DRILL P PROD1 Log tie-in. Added 4 ft CTD. 22:30 - 23:15 0.75 DRILL N RREP PROD1 Test Generator #1 under various loads to determine cause of generator kick-out problem. 23:15 - 23:45 0.50 DRILL P PROD1 RIH to TO. 23:45 - 00:00 0.25 DRILL P PROD1 Orient TF. 10/23/2001 00:00 - 00:30 0.50 DRILL P PROD1 Orient TF. 00:30 - 03:00 2.50 DRILL P PROD1 Drilling, TF = 90R, 1.6/1.6 bpm, 3100 psi, 88 deg incl. Drilled to 11,800 ft. 03:00 - 04:30 1.50 DRILL P PROD1 Drilling, TF = 11 OR, 1.6/ 1.6 bpm, 3100 psi, 89 deg incl. Drilled to 11,827 ft. 04:30 - 05:45 1.25 DRILL P PROD1 Wiper trip to window. Hole was clean. 05:45 - 08:45 3.00 DRILL P PROD1 Drilling, TF = 140R, 1.6/1.6 bpm, 3100 psi, 88 deg incl. Drilled to 11873 ft. Still in shale. 08:45 - 10:30 1.75 DRILL P PROD1 Orient straight up & attempt to come back up out of shale. Geologists working on plan forward. Drill ahead to 11915'. 10:30 - 11 :50 1.33 DRILL P PROD1 Orient around for 90R and drill ahead. Project 92 deg at bit at 11920' MD. 1.7/1.7 BPM. 3700 psi. 22 fph ROP. Drilled to 11945 ft. 11 :50 - 13:30 1.67 DRILL P PROD1 Wiper trip to window. Hole was clean. Printed: 11/5/2001 10:48:46 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 10/23/2001 10/24/2001 (( (' BP EXPLORATION Operations Summary Report 05-28 05-28A REENTER+COMPLETE NORDIC CALISTA NORDIC 1 From - To Hours Activity Code NPT 13:30 - 14:00 14:00 - 15:30 15:30 - 18:00 18:00 - 19:30 19:30 - 22:00 22:00 - 22:30 22:30 - 23:00 23:00 - 23:30 23:30 - 23:45 23:45 - 00:00 00:00 - 01:15 01:15-03:15 03:15 - 05:15 05:15 - 06:00 06:00 - 07:25 07:25 - 08:20 08:20 - 09:00 09:00 - 10:20 10:20 - 11 :50 11:50-12:50 12:50-13:10 13:10 - 15:45 0.50 DRILL 1.50 DRILL P P 2.50 DRILL C 1.50 STKOH C 2.50 STKOH C 0.50 STKOH C 0.50 STKOH C 0.50 STKOH C 0.25 STKOH C 0.25 STKOH C 1.25 STKOH C 2.00 STKOH C 2.00 STKOH C 0.75 STKOH C 1.42 STKOH C 0.92 STKOH C 0.67 STKOH C 1.33 STKOH C 1.50 STKOH C 1.00 STKOH C 0.33 STKOH C 2.58 STKOH C Phase PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Page 5 of 10 Start: 10/17/2001 Rig Release: 10/30/2001 Rig Number: Spud Date: 10/17/2001 End: Description of Operations Orient TF to high side. Drilling, TF = 30R, 1.6 / 1.6 bpm, 3200 psi, Drilled to 11,970 ft. Still drilling shale. Decision was made to perform open hole sidetrack to locate target sand. POOH for sidetracking BHA. Flag CT at 10,300 ft EOP. Tag up at surface, shut down for crew change. Break lubricator, change out BHA's. Pick up 1.83 deg motor and non-bicenter DPI 2.75" bit to sidetrack. Change batteries in MWD. Change out orienter. . RIH with BHA #9, shallow hole test at 4500', all worked ok. Continue RIH. Log tie in pass down from 10375'. [-5 ft CTD]. RIH to Kick Off Point. Ream down from 11460 - 11490 ft. TF = 120 deg. Flag CT at 11,490 ft. Back ream. 1.6/1.6 bpm, 2950 psi. Orient TF around to 150R. Ream trough down from 11475 - 11490 ft. TF = 150L. Original hole drilled at 90R at this depth. 1.6/ 1.6 bpm, 2950 psi. Ream trough for open hole side track in Zone 1A sand. Ream down from 11475 - 11490 ft at 0.5 fpm. TF = 150L. Back ream. Ream down at 0.2 FPM from 11475 - 11490 ft. TF = 150L. 1.6/ 1.6 bpm, 2950 psi. Drill Open hole sidetrack, 0.1 fpm. Lost 100 psi motor work at 11,494 ft. Bit jumped over ledge. Surveys indicated not sidetracked. Pull up to 11,460 ft. ream trough down again. Ream down at 11485 ft at 0.1 ft / 2 min. TF = 150L. Stacking wt. Having trouble with weight transfer. Having problems at shale at 11308'. Backream up through shale, and short trip to shoe. Order new mud with 12 ppb clayguard. Tagged shale at 11308' on way back in hole. Work it a couple of times to ensure that it is free. Continue to bottom. Begin side tracking. Moving flag 5' deeper to 11495'. Begin troughing down from 11470'-11495' at 15 fph. Can1t get weight transfer. Probably due to old mud. New mud on location. Short trip while new mud is displaced. OH displaced to new mud, continuing mud swap. Began down troughing from 11470' at 15 fph, getting much better weight transfer now. Down weight 10500 Ibs. 1.6 in/out, 2900 psi ctp. TF 150L. Saw work at 11490', then bounced through. Continued to 11495' flag. 2nd down troughing pass. 11470'-11495'. 15 fph, 1.6 in/out. 2800 psi ctp. Completely swapped to new mud now. Did not see any motor work at 11490' on this pass. Held 150 L tool f;:ice during entire troughing pass. 3rd down troughing pass. 11470'-11495'. 15 fph, 1.6 inlout. 2825 psi ctp. Held 150 L tool face. No motor work at 11490'. Back at flag, which is 11495' now. Park at flag for 20 minutes. Begin time drilling at 0.1'/5 minutes. Getting small amounts of Printed: 11/5/2001 10:48:46 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 10/24/2001 10/25/2001 ( ( BP EXPLORATION Operations Summary Report 05-28 05-28A REENTER+COMPLETE NORDIC CALISTA NORDIC 1 From - To Hours Activity Code NPT 13:10 -15:45 15:45 - 16:05 16:05 - 16:25 16:25 - 17:25 17:25 -19:30 19:30 - 20:00 20:00 - 00:00 00:00 - 03:15 03:15 - 03:30 03:30 - 04:10 04:10 - 06:15 06:15 - 07:00 07:00 - 07:35 07:35 - 07:50 07:50 - 08:10 08:10 - 10:30 10:30 -10:45 10:45 - 11 :30 11:30-13:15 13:15 - 16:00 16:00 - 16:10 16:10-16:50 16:50 - 17:00 17:00 - 18:45 18:45 - 20:30 20:30 - 20:45 20:45 - 23:30 23:30 - 23:45 23:45 - 00:00 2.58 STKOH C 0.33 STKOH C 0.33 STKOH C 1.00 STKOH C 2.08 STKOH C 0.50 STKOH C 4.00 DRILL C 3.25 DRILL C 0.25 DRILL C 0.67 DRILL C 2.08 DRILL C 0.75 DRILL 0.58 DRILL C C 0.25 DRILL C 0.33 DRILL 2.33 DRILL 0.25 DRILL C C C 0.75 DRILL 1.75 DRILL 2.75 DRILL 0.17 DRILL C C C C 0.67 DRILL 0.17 DRILL C C 1.75 DRILL C 1.75 DRILL C 0.25 DRILL 2.75 DRILL C C 0.25 DRILL C 0.25 DRILL C Phase PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Page 6 of 10 Start: 10/17/2001 Rig Release: 10/30/2001 Rig Number: Spud Date: 10/17/2001 End: Description of Operations motor work every tenth of a foot. Continue sidetrack. Increase ROP to 0.1' every 2 minutes. Still drilling at 1.6 in/1.6 out. 100% returns. 2780 psi ctp. Taking weight and getting motor work. Looks good. Increase ROP to 0.1 fpm, (5 fph) getting 1500 Ibs WeB, 250 psi motor work from 11498'-11500'. 11500', increase ROP to 20 fph. Getting good motor work, 1500 Ibs weight on bit. Confirmation of sidetrack from inclination. Drill to 11560', POOH for BOP test, and to pick up lateral section BHA. Layout sidetrack BHA. Perform weekly BOPE Pressure / function test. Witness waived by AOGCC. Perform weekly BOPE pressure / function test. Witness waived by AOGCC. SAFETY MEETING. Reviewed HSE performance and BHA make up. M/U MWD BHA # 10 with 1.15 deg motor and HC bi-center bit #8 RR2. RIH with MWD BHA #10. Shallow test MWD tools and orienter. RIH. Logged Tie-in with GR at 10375 ft. Make -2 correction. RIH Orient round to 150L, run through sidetrack ok, no bobbles on weight. Drill directionally from 11565'. Free spin 3050 psi, drilling at 3380 psi CTP, 1.6 in/out, ROP=40 fpm. 11584', orient to 60R Resume drilling 11645' Difficult to get good weight transfer. Mini short trip to just below sidetrack depth. 11520'. Resume drilling. 11673' Wiper trip to shoe. Resume drilling, 1.6 in/out, 11770', orienting. Attempting to drop down to 8730' TVD from 8725'. Resume drilling. 1.6 in/out. 11784', orient back to high side to build back up to 8725' from 8730'. (Dueling geologists???). Resume drilling. 1.6 in/out, Free spin 3150 psi. Drilling at 3650 psi. TF 30R. Drilled to 11,865 ft. Wiper trip to window. Hole in good condition. RIH and tag TD at 11865 ft. Orient TF to 45R. Drilling, TF = 60R. 1.6 /1.6 bpm, 3200 psi, 93 deg inct. Drilled to 11,941 ft. Orient TF to high side. After spudding thru shale at 11903 ft, Incl fell from 92.8 deg to 87 deg in 6 ft MD, despite having a building TF. Orient to high side to get back to 93 deg incl. Drilling, TF = 5R, 1.6/1.6 bpm, Incl = 87.7 deg, trying to build incl back up to 93 deg. Drilled to 11950 ft. Printed: 11/5/2001 10:48:46 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 10/26/2001 10/27/2001 ( ( BP EXPLORATION Operations Summary Report 05-28 05-28A REENTER+COMPLETE NORDIC CALISTA NORDIC 1 00:00 - 00:30 From - To Hours Activity Code NPT 00:30 - 02:30 02:30 - 04:30 04:30 - 04:45 04:45 - 06:30 06:30 - 07:20 07:20 - 08:30 08:30 - 09:30 09:30 - 12:30 12:30 - 14:30 14:30 - 18:00 18:00 - 18:10 18:10 - 19:30 19:30 - 20:00 20:00 - 22:00 22:00 - 00:00 00:00 - 01 :00 01:00 - 01:45 01 :45 - 04:00 04:00 - 05:20 05:20 - 05:45 05:45 - 06:50 06:50 - 09:00 09:00 - 12:20 12:20 - 12:50 0.50 DRILL 2.00 DRILL 2.00 DRILL 0.25 DRILL 1.75 DRILL 0.83 DRILL 1.17 DRILL 1.00 DRILL 3.00 DRILL 2.00 DRILL 3.50 DRILL 0.17 DRILL 1.33 DRILL 0.50 DRILL 2.00 DRILL 2.00 DRILL 1.00 DRILL 0.75 DRILL 2.25 DRILL 1.33 DRILL 0.42 DRILL 1.08 DRILL 2.17 DRILL 3.33 DRILL 0.50 DRILL C P P P P P P P P P P P P P P P P P P P P P P P P Phase PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Page 7 of 10 Start: 10/17/2001 Rig Release: 10/30/2001 Rig Number: Spud Date: 10/17/2001 End: Description of Operations Drilling, TF = 5R, 1.5/ 1.5 bpm, 3100 psi, Drilled to 11,970 ft. This was TD of Plugback hole. Drilling, TF = 70R, 1.6 / 1.6 bpm, 3200 psi, 93 Deg incl. Drilled to 12,002 ft. Wiper trip to window. Hole was clean. RIH. Orient TF. Drilling, TF = 50R, 1.5/ 1.5 bpm, 3100 psi, Drilled to 12,028 ft. Stacking weight at 12031'. Attempts to continue drilling unsuccessful. Attempt a pill with higher lubtex content. Pill was encouraging. Call town, swap to new mud. 12062', Short trip up to the shoe to wait for new mud. Circulate at 10460', waiting on mud. New mud on location, Run back in hole to resume drilling. Begin mud swap. 12062', Return to drilling. 1.6 in/out. 3280 psi free spin? Seems a bit high. Probably new mud with higher LSRV. Will shear after a couple of circulations. ROP slow. Drilled into shale at 12,090 ft. Still problems with weight transfer. 12110', orient 2 clicks to bring tool face up to 90L. Resume drilling, 1.5 in/out, 3250 psi free spin, 20 fph Rap. TF = 1 OOL. Drilled to 12128 ft. Stacking Wt. Still drilling down out of shale. Wiper trip, 300 ft. Drilling, TF = 90L, 1.6 / 1.6 bpm, 3250 psi, Drilled down into good sand at 12,160 ft. Drilled to 12,190 ft. Stacking Wt. Wiper trip to window. Trip out clean. Ream shale at 12,120-12,150 ft. Back at TD of 12,190 ft at 00:00 hrs. Drilling, TF = 30L, Drilled out bottom of sand at 12180 ft. Sand was only 2.2 vertical ft. thick. Drilled shale to 12,208 ft. Stacking wt. 200 ft wiper trip. Ream shales at 12,110 - 12,150' again. [180 API GR shale] Drilling rathole for liner float equipment. TF = 10L, 1.5 / 1.5 bpm, 3200 psi. Drilled to TD of 12,225 ft. Unable to drill further in shale. Stacking 8000 Ibs at surface to drill ahead very slowly. Wiper trip to window. Back ream shales at 12,150 -12,000 ft at 6 fpm. Hole was clean to window. Logged Tie-in with GR at 10,375 ft. Added 13 ft CTD. RIH. Saw work through shale at 12,090'-12,150'. Tag bottom at 12,235'. Backream shale at 12090'-12150'. Getting motor work and drag. Work both up and down to clean up. Had significant motor work on first several passes up and down. Finally got it cleaned up. Made final 3 passes through it clean. POOH to begin running liner. EOP flags at 9800' & 8100'. Tag up at surface, rig down drilling BHA. Hughes BC bit was in perfect condition. Printed: 11/5/2001 10:48:46 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 10/27/2001 10/28/2001 ( ( BP EXPLORATION Operations Summary Report 05-28 05-28A REENTER+COMPLETE NORDIC CALISTA NORDIC 1 12:50 -13:35 From - To Hours Activity Code NPT COMP 13:35 - 14:00 14:00 - 18:45 18:45 -19:15 19:15 - 21 :30 21 :30 - 22:30 22:30 - 00:00 00:00 - 00:30 00:30 - 01:15 01:15 - 04:00 04:00 - 04:15 04:15 - 05:00 05:00 - 05:35 05:35 - 06:25 06:25 - 07:15 07:15 -10:30 10:30 -12:00 12:00 -12:15 12:15 - 12:45 12:45 -13:00 13:00 -14:15 14:15 -16:00 0.75 CASE 0.42 CASE 4.75 CASE 0.50 CASE 2.25 CASE 1.00 CASE 1.50 CASE 0.50 CASE 0.75 CASE 2.75 CEMT 0.25 CEMT 0.75 CEMT 0.58 CEMT 0.83 CEMT 0.83 CEMT 3.25 CEMT 1.50 CEMT 0.25 CEMT 0.50 EVAL 0.25 EVAL 1.25 EVAL 1.75 EVAL P P P P P P P P P P P P P P P P P P P P P P Phase COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP Page 8 of 10 Start: 10/17/2001 Rig Release: 10/30/2001 Rig Number: Spud Date: 10/17/2001 End: Description of Operations Safety meeting prior to running liner. Discussed order of liner running, kick proceedure for both the liner and CS Hydril inner work string. Wait for MWD to complete rigging down and move out of the way. MU 2-318" STL liner as per proceedure. Shut down for Crew change and safety meeting prior to resuming running CS Hydrill work string. M/U 20 ft Baker stinger and 1" CSH workstring inside 2 3/8" liner. Fill CSH ann. with water. Press test CSH ann. Space out and M/U Baker running tools. Pull test running tools. Open 2 3/8" slips. RIH with 2 3/8" liner on CT. Liner total length = 2,363.46 ft. Circ. at 0.3 bpm at 1700 psi. Correct depth at flag at 8500', [-9 ft CTD] RIH with liner, work to bottom from 12,000 -12,217 ft. Stack wt several times at 12,217 ft CTD. Hard bottom. Shoe appears to be at TD of 12,235 ft. CT depth error partially caused by working CT many times to get liner to bottom. Counter slippage. Circ. 0.8 bpm, 2800 psi, Full returns, Pump 10 bbls to ensure open hole is clean. Insert 5/8" ball. Displace with FloPro. Ball on seat at 29.7 bbls, Sheared at 3800 psi, picked up, free from liner. Sat down wt again. Circulate well to slick 2% KCL water. Recover FloPro. Pump 1 bpm, returns of 0.8 bpm with water on formation. [20% loss]. 1.0 I 0.7 bpm, 3700 psi pump press, R/U DS cementing equipment. SAFETY MEETING. Review cement job and hazards with personnel. Batch mix 15.8 ppg, G CMT. CMT at wt at 04:45 hrs. Press test lines with 4000 psi. Stage 15.8 ppg, G CMT slurry. 0.9 I 0.7 bpm, 3000 psi, Pump 23.2 bbls CMT into coil. Purge cement lines. Displace cement with 2 % KCL water with rig pumps. Pump 0.9 bpm, 3000 psi, 0.6 bpm returns, 25 bbls displ, 0.7 bpm I 0.6 bpm, 3500 psi 30 bbls displ, 0.7 bpm I 0.6 bpm, 3900 psi. 35.3 bbls displ, 0.6 bpm I 0.5 bpm, 4000 psi. Stop displacement. 17.0 bbls CMT returned around shoe. Sting out. Lay in 2 bbls CMT in liner. Pump 20 bbls Biozan [ 2 ppb ] to contaminate. Jet cement to top of flapper valve. (Tagged at 12192') POOH, jetting with KCL water. Tag up at surface. Standback CS hydrill work string. Lay down liner deployment tools. Safety meeting prior to picking up radioactive memory logging tools. Make up SWS logging tool. RIH with CS hydrill jointed pipe. RIH with Memory tools on coil. BHA length=2374'. Cement Printed: 11/5/2001 10:48:46 AM ( (- BP EXPLORATION Page 9 of 10 Operations Summary Report Legal Well Name: 05-28 Common Well Name: 05-28A Spud Date: 10/17/2001 Event Name: REENTER+COMPLETE Start: 10/17/2001 End: Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 10/28/2001 14:15 - 16:00 1.75 EVAL P COMP UCA=1600 psi at 14:30 PM. 16:00 -17:15 1.25 EVAL P COMP 9750', Begin down log with SWS Memory CNL-GR-CCL tool. Cement UCA=2000 psi at 17:00 PM. Tagged up at 12197' on down pass, CTM. No correction needed to get on depth to tally. 17:15 -18:45 1.50 EVAL P COMP Log up off bottom at 12197'. Lay in 150 k LSRV Flo pro pill on way out of hole. (14 bbls) Logging up at 30 fpm to 9,750 ft. 18:45 - 21 :00 2.25 EVAL P COMP POOH with Memory CNUGRICCL. 21 :00 - 22:00 1.00 EVAL P COMP Stand back 1" CSH workstring in doubles. 22:00 - 22:15 0.25 EVAL P COMP SAFETY MEETING. Review hazards and procedure for handling CNL tools. 22:15 - 23:30 1.25 EVAL P COMP Recover SWS logging tools and download Memory data. Good data. Fax log to Anc. 23:30 - 00:00 0.50 PERF N WAIT COMP Wait on perf guns. 10/29/2001 00:00 - 00:30 0.50 PERF N WAIT COMP Wait on perf guns to arrive at rig. 00:30 - 01 :30 1.00 CASE P COMP Pressure test 2 3/8" Liner lap with 2000 psi. Press slowly dropped to 1400 psi over 30 min. Liner Lap did not pass pressure test. 01 :30 - 02:00 0.50 PERF P COMP Load SWS 1.56" perf guns into pipe shed. 54 guns total, 1,165 ft. total. 02:00 - 02:15 0.25 PERF P COMP SAFETY MEETING. Review gun handling procedures and hazards. 02:15 - 05:15 3.00 PERF P COMP RIH with 54 perf guns, SWS 1.56" Power Jet, 4 SPF, 60 deg phasing. 05:15 - 06:15 1.00 PERF P COMP RIH with 22 stds, 1" CSH workstring. M/U BKR tools. BHA = 2513.6 ft. 06:15 - 07:40 1.42 PERF P COMP RIH with CT. At 7700' MD at 07:20 hrs. 07:40 - 08:20 0.67 PERF N SFAL CaMP Leak on coil swivel. Repaired. 08:20 - 09:00 0.67 PERF P CaMP Continue to RIH with guns. 09:00 - 09:15 0.25 PERF P CaMP Tie into top of flapper valve. 09:15 - 09:35 0.33 PERF P CaMP Safety meeting prior to firing guns. 09:35 - 11 :40 2.08 PERF N DFAL COMP Repeat liner lap test, it failed. Also unable to fire guns with EFire. 11 :40 - 13:00 1.33 PERF P COMP Position coil. Shoot upper guns using drop ball firing head. 10835'-11090',11350'-11550',11660'-11745'. 4 spf. 13:00 -15:00 2.00 PERF P COMP Pull Coil OOH. 15:00 -15:30 0.50 PERF P COMP Safety Meeting. 15:30 -16:30 1.00 PERF P CaMP Stand back CS Hydril. 16:30 - 17:00 0.50 PERF P CaMP Safety Meeting. 17:00 -18:00 1.00 PERF P COMP Lay down perf guns. 18:00 - 18:30 0.50 PERF P COMP Crew change/safety meeting. 18:30 - 20:30 2.00 PERF P COMP Resume laying down guns to E-Fire head. All shots fired to this point. Found head packed w/ cmt. Head saw 400, 600 and 1000 psi press, but did not fire 20:30 - 21 :15 0.75 PERF N DFAL COMP MU ball drop head to guns that didn't fire 21: 15 - 21 :30 0.25 PERF N DFAL CaMP Safety mtg 21 :30 - 22:45 1.25 PERF N DFAL COMP MU 38 stds CSH 22:45 - 00:00 1.25 PERF N DFAL COMP RIH wI CT 10/30/2001 00:00 - 00:30 0.50 PERF N DFAL COMP Fin RIH w/ CT 00:30 - 01 :30 1.00 PERF N DFAL COMP Tag PBD at 12197' CTD. Corrto 12200'. Pump 5 bbls fresh Flo Pro mud. Load 1/2" ball and displ w/ KCI at 1.3/3600 to seat. Sheared at 3200 psi. Perforated 11970-12085' and Printed: 11/5/2001 10:48:46AM ( (- BP EXPLORATION Page 10 of 10 Operations Summary Report Legal Well Name: 05-28 Common Well Name: 05-28A Spud Date: 10/17/2001 Event Name: REENTER+COMPLETE Start: 10/17/2001 End: Contractor Name: NORDIC CALISTA Rig Release: 10/30/2001 Rig Name: NORDIC 1 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 10/30/2001 00:30 - 01 :30 1.00 PERF N DFAL COMP 12160-12185' 01 :30 - 03:00 1.50 PERF N DFAL COMP POOH wI CT 03:00 - 05:15 2.25 PERF N DFAL COMP LD CSH workstring 05:15 - 05:30 0.25 PERF N DFAL CaMP Safety mtg 05:30 - 07:00 1.50 PERF N DFAL COMP LD perf guns-all shots fired 07:00 - 07:30 0.50 RIGD P CaMP RI H wI nozzle to 2000' 07:30 - 08:45 1.25 RIGD P COMP WO MeOH 08:45 - 09:45 1.00 RIGD P CaMP POOH freeze protecting wI MeOH. SI swab. RU DS N2 09:45 - 10:00 0.25 RIGD P CaMP Safety mtg 10:00 -11:15 1.25 RIGD P CaMP PT DS. Displace CT wI N2 and bleed off 11:15 -15:00 3.75 RIGD P CaMP Pull CT to reel. Remove gooseneck. Set injector in box 15:00 - 16:30 1.50 RIGD P CaMP ND BOPE. NU tree cap and test RREL 1630 hrs 10/30101 Printed: 11/5/2001 10:48:46 AM ObP (' BP Amoco Baker Hughes INTEQ Survey Report ,----------- --------------------- --------------------_._-----.-.----_.- Company: BP Amoco Field: Prudhoe Bay Site: PB DS 05 Well: 05-28 Wellpath: 05-28APB1 (' .ii. .... INTEQ -------- - --.----- ----.----------- ------- __h__- -- --- -- ---- -_n_____'- ----- -- _-n- --, Date: 11/112001 Time: 15:32:21 Page: 1 Co-ordinate(NE) Reference: Well: 05-28. True North Vertical (TVD) Reference: 53: 28 8/22/1991 00:0070.0 Section (VS) Reference: Well (0.OON,0.00E,346.96Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Field: -- ------------- ------------------ -------_____m_____------ --------------- -,---- --------- --,- m__- - -------------------- n_______n___'------'-------------'----------_---'-n'------'------"-----'--------- -- - -- -- - Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 : Geo Datum: NAD27 (Clarke 1866) : Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2001 Site: -,---- --- -----------..----.---.----------- - ------ -------------------------------------.------.-------------h______- - ---------.-------------- ----- --'n -------------- ______n______-- - ---.- --------------.---------------------------------------------------------------------..-- PB DS 05 TR-11-15 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5947204.70 ft 697428.91 ft Latitude: 70 15 35.696 N Longitude: 148 24 14.424 W North Reference: True Grid Convergence: 1 .50 deg -----------------------..-------.-------------------- -----.-------------------------------..------.-.------------..-.---------.---------------------------------------.-.. - --------- ------------------- - --- -- ---- ----- -- --- - ---- - .-- ----- -------- -- --------.----------------_.-----,-._-----,_...._-------- -,--_._------ - _,_-------,----,',-------'-______n_____----,----, ---.-----------..,--. --.---------.------- .--- ._---,---.-------------------- ----,--- - -'--- -- --- Well: 05-28 05-28 Well Position: +N/-S 1814.57 ft Northing: +E/-W 747.76 ft Easting: Position Uncertainty: 0.00 ft 5949038.14 ft 698128.80 ft Slot Name: Latitude: Longitude: 28 70 15 53.542 N 148 23 52.662 W - --.-,n_.-..-,---._-,--,-,-,-- '--'--------'_'___n_n______------------.-----...----,,-------..--..------------.,-------,---------------.---------_n____________n____'_'-------------'--_'_._.n-.____.--------------_.-,--- ------.-_____n- - - -------- n- .-- ----,-.------ -- ----'--------------'-----'---"'--------'-------"___'_h- -'--'-'-______n_'_"______.n.____.-------.---,-.----------..-.----------------.------...---------.-------------------------_._,-,-,---------_._._- -.---- Wellpath: 05-28APB1 500292220870 Current Datum: 53 : 28 8/22/1991 00:00 Magnetic Data: 11/1/2001 Field Strength: 57511 nT Vertical Section: Depth From (TVD) ft --------------._----- --------'--'--"---"------------------------"------------------------- 0.00 Height 70.00 ft +N/-S ft --------hh-"h_"'__--'---'-------'----"-'----"---- - 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft ----,---...-...-.. 0.00 05-28 10560.00 ft Mean Sea Level 26.66 deg 80.81 deg Direction deg -----"-----'----"'----'-"-------'---'---'___'__n'___--_------ 346.96 Survey: ---..-...---. --.- '------"'__'_"h- ---______h__--"--_--------------------------'----------------.--...-.-.-----.-----.--..-..-------.---- -"'---'-------"--------'--------"---'---------______n__--_---------------..------- 10/23/2001 - h______--'-- h ---- -- .----- ---- - ---._-_.--... ------------..------------...--.-.---.------ - --------.-.,--------------.-..---.----...----.--.---,-.----.------'----"-------'-----'---------'--.---------.--------------"-"---'-"""-----""'--'-"--"----'--'-'-'--'..-"'-"--'-----'-----------'--'-----------.-"-------'-'----------"'------ -----------,-_._----- ------- ___h______-- - MWD Company: Baker Hughes INTEQ Tool: MWD,MWD - Standard Start Date: Engineer: Tied-to: From: Definitive Path -- ------,. ___h_____"-----"---'---"- -------..-----...----..--.-.-----.---.-..-.---,.--.--.-...-----,-...-.----.,---.--.-.-------------,..---.-,--..-------.-- --.---..--,---. --.----,.--.--...-- --"--"--..' --..--- -------.---..-....--.-,---------,.-,.---. -------. -- ,. --- - --- -.- - . Annotation 10560.00 11970.00 Survey 8678.44 8812.59 KOP TD .. -.,-.-,--.--.,-....-,.,-:.,----... '--""-.'---"""-"-"-----"----'-'------"----"""------""'--"'-"---...------"'-".-"-7",-",.,---..-,....".----,--",,-,-,-,,--------"----------"'_'---,c--:"-"-'-'--------_'_----'-"'"_._--,~._-,-.---.--",_...._--_.-.--..."._-., "'---'."--.---- ---"----'-.-'-...-..--- -"-""".....----- MD Inct ,Azim ,TVD, SSTVJ) , N/SEIW ' "Måp~ MapE ' DLS VS ---.,_.. -_....~._._- ,..: ..,--.....---_.:~!~._-_.---_.._--..~:~.~---,_._...._!!_. ._.--,._--,_.._--~~~:~._" _.._-_..:_--,~.._-,:,,_:,-,_._._---._.::~---,..--,:._,---_-----_.~fL.~_..._.,,-",-"._.,,-,._,..._...,~.._._..,_:_,~---_....,.._""~,~-~_!~,~~,._...,---.,~. .,.__.,~..- ,--....-- 10560.00 37.13 350.84 8678.44 8608.44 5458.35 -796.81 5954473.34 697188.67 0.00 5497.42 10570.00 38.44 348.38 8686.35 8616.35 5464.38 -797.92 5954479.33 697187.41 19.97 5503.53 10623.51 45.53 332.26 8726.21 8656.21 5497.71 -810.21 5954512.32 697174.24 24.04 5538.78 10653.90 46.14 325.58 8747.40 8677.40 5516.36 -821.45 5954530.67 697162.51 15.89 5559.48 10687.83 54.49 319.95 8769.06 8699.06 5537.06 -837.29 5954550.95 697146.14 27.71 5583.23 10719.74 10758.33 10794.39 10833.64 10870.42 10904.09 10934.97 10977.07 11016.80 11051.82 11084.90 11111.82 11142.65 65.13 79.98 84.81 85.25 88.07 87.28 86.66 87.01 90.88 93.69 94.13 91.85 86.59 315.03 312.22 311.52 308.35 306.95 304.48 302.73 300.62 297.80 301.32 303.78 305.89 306.59 8785.09 8796.63 8801.40 8804.80 8806.94 8808.31 8809.94 8812.27 8813.00 8811.60 8809.34 8807.94 8808.36 8715.09 8726.63 8731.40 8734.80 8736.94 8738.31 8739.94 8742.27 8743.00 8741.60 8739.34 8737.94 8738.36 5557.31 5582.61 5606.46 5631.56 5653.98 5673.62 5690.69 5712.76 5732.14 5749.40 5767.15 5782.51 5800.72 -855.94 -882.54 -909.15 -939.12 -968.19 -995.51 -1021.19 -1056.96 -1091.62 -1122.05 -1149.87 -1171.93 -1196.79 5954570.70 5954595.29 5954618.43 5954642.73 5954664.38 5954683.29 5954699.67 5954720.79 5954739.25 5954755.70 5954772.72 5954787.49 5954805.04 697126.96 697099.71 697072.48 697041.86 697012.21 696984.39 696958.27 696921.93 696886.77 696855.90 696827.63 696805.17 696779.85 35.89 39.10 13.53 8.12 8.56 7.70 6.00 5.07 12.05 12.85 7.54 11.53 17.21 5607.16 5637.81 5667.04 5698.26 5726.66 5751.95 5774.37 5803.94 5830.64 5854.32 5877.89 5897.83 5921.18 -'----'-----'__"_h__"'_h--_____---_-_----n__--- -----.---......--.-..-..-----------..----------.-------.-----.--.--_"'_-_'_---'-------,--,------.------------_.._-------,-_.-----------"'--""--"--_'___"h'_'-__-_h'_'___-"----"-'-----'.-----..--,.---.--.. - - "'___h______---' -- -- --------- ---. ObP ( ( BP Amoco Baker Hughes INTEQ Survey Report Biií8 ..... INT EQ h--- --. -. - ---... _-_'h -- --- -.-- -.--- ---- Company: BP Amoco , Field: Prudhoe Bay Site: PB OS 05 Well: 05-28 Wellpath: 05-28APB1 ---- -- -- -- ----- --- -- --- ---- -- ----- ----- ---.- - -----.---- Date: 11/112001 Time: 15:32:21 Page: 2 Co-ordinate(NE) Reference: Well: 05-28. True North Vertical (fVD) Reference: 53: 28 8/22/1991 00:0070.0 Section (VS) Reference: Well (0.00N.0.00E.346.96Azi) Survey Calculation Method: Minimum Curvature Db: Oracle . Survey ,- -.....-- ------- _uu- ------------ ---------------------------_u_------.-.----------------------------------------------------------------------------. .---------- ---_u_-----------u_-----------, --- -- -- .-- --- --... _u_-- _____h______..--------------- -------- ---- --_...._------- --------.._----------------- -------------------------------------._---,---------------------_..------ -- ------ ----- -h_-_...---. MD Incl Azim TV» SSTVD N/S EIW MapN MapE DLS VS ft deg deg ft ft ft ft ft ft deg/10OO ft ,-- ---- --- -.-..-,..-------..-----------.---------.---------..---..---------------.---------.-----.--.--------------------..--------.--..-----..-- ------... ..--.....- --..u_.----- ----..._..._d .--..--.- --...- -- - 11176.67 89.38 309.41 8809.56 8739.56 5821.65 -1223.57 5954825.26 696752.52 11.66 5947.61 11227.59 87.89 311.16 8810.77 8740.77 5854.56 -1262.40 5954857.14 696712.84 4.51 5988.44 11262.46 11305.34 11337.96 11381.94 11414.51 11439.29 11486.54 11545.12 11574.94 11610.02 11651.87 11691.44 11738.64 11773.57 11804.07 11836.82 11877.17 11908.22 11925.77 11939.07 11970.00 89.74 89.30 90.35 91.76 90.79 90.00 92.81 93.87 93.60 92.46 88.24 84.46 85.43 88.68 89.56 88.68 86.75 92.02 91.23 89.65 89.65 314.33 317.84 320.66 324.88 327.34 329.09 332.96 337.88 340.34 343.16 345.62 347.38 351.95 353.35 354.41 356.16 357.22 357.92 356.52 357.57 357.57 8811.49 8811.85 8811.95 8811.14 8810.41 8810.24 8809.08 8805.67 8803.73 8801.87 8801.62 8804.14 8808.30 8810.09 8810.56 8811.06 8812.67 8813.00 8812.51 8812.40 8812.59 8741.49 8741.85 8741.95 8741.14 8740.41 8740.24 8739.08 8735.67 8733.73 8731.87 8731.62 8734.14 8738.30 8740.09 8740.56 8741.06 8742.67 8743.00 8742.51 8742.40 8742.59 5878.22 5909.11 5933.82 5968.82 5995.85 6016.91 6058.22 6111.38 6139.18 6172.45 6212.74 6251.13 6297.37 6331.96 6362.28 6394.92 6435.17 6466.17 6483.70 6496.98 6527.88 -1288.00 -1317.74 -1339.03 -1365.62 -1383.78 -1396.83 -1419.71 -1444.03 -1454.64 -1465.60 -1476.86 -1486.08 -1494.51 -1498.97 -1502.22 -1504.91 -1507.24 -1508.56 -1509.41 -1510.10 -1511.41 5954880.11 5954910.20 5954934.34 5954968.63 5954995.17 5955015.88 5955056.57 5955109.07 5955136.58 5955169.54 5955209.52 5955247.65 5955293.65 5955328.12 5955358.34 5955390.89 5955431.06 5955462.02 5955479.51 5955492.77 5955523.63 696686.63 696656.09 696634.16 696606.65 696587.79 696574.19 696550.24 696524.53 696513.19 696501.35 696489.04 696478.82 696469.17 696463.80 696459.75 696456.21 696452.82 696450.69 696449.38 696448.34 696446.22 10.52 8.25 9.22 10.11 8.12 7.75 10.12 8.58 8.28 8.66 11.67 10.53 9.86 10.13 4.52 5.98 5.46 17.12 9.16 14.26 .. ..-....-- d.......d_._-" ---- ""'--d .....-..-..---...._..."h_"".__"_d"_'__--"--""'-'-----."-_U"""---'...-....--..u...--,_u_...."",----...-"....---......-".....--.."u_--." --------"---"..._-,..........----_.............__..--------...-..--..---,,...,-,,- ,."---."m --.-.. ".."......,--.-- 6017.26 6054.05 6082.93 6123.03 6153.45 6176.92 6222.32 6279.60 6309.08 6343.96 6385.75 6425.23 6472.18 6506.89 6537.16 6569.56 6609.30 6639.81 6657.07 6670.16 0.00 6700.56 Rig: Ref. Dafum: V.Section Angle WELLPATH DETAILS 05-2BA 500292220801 05-28APB1 11490.00 Nordic 1 53: 28 8/2211991 00:00 lO.OOft 7100 7000 6900 6800 Origin +NI.S Origin +E/-W Starting From WD 345.00' 0.00 0.00 0.00 REFERENCE INFORMATION Co-ordinate (N/E) Reference: Well Centre: 05-28. True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: Slot - 28 (O.OON,O.OOE) Measured Depth Reference: 53.288/22/1991 00:00 70.00 Calculation Method: Minimum Curvature ANNOTATIONS TVO 873891 1149000 KOP 872142 1223500 TO 8250 8300 8350 8400 8850 8900 8950 9000 MD A,"ototioo LEGEND 6700 ?600 ~6500 <:) <:) '1"'6400 ..... - ... 6300 :c 1::6200 «:I ~6100 "';" ¡6000 ::¡ J$5900 5800 5700 5600 5500 5400 Magnetic Field Strength: 57507nT Dip Angle: 80.80' Date: 7/30/2001 Model: BGGM2001 Welip,'h (DS-28!O5-28A) Ceeaiod By ad; f'olpis D,te 11/1/2001 -2500-2400-2300-2200-2100-2000-1900-1800-1I00-1600-1500-1400-1300-1200-1100-1000 -900 -800 -700 -600 -500 -400 -300 -200 -100 West(-)/East(...) [10Oftlin] 0 100 5250 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900 5950 6000 6050 6100 6150 6200 6250 6300 6350 6400 6450 6500 6550 6600 6650 6700 6750 6800 6850 6900 6950 7000 7050 7100 7150 Vertical Section at 345.00' 11/1/2001 3:29 PM ObP (' BP Amoco Baker Hughes INTEQ Survey Report ( B.. .... (NT EQ .. -----..------------------ ------- ---- ---- -------------- ---------------------------------..--------------------------------------------------------- --------------------------- --- ----- __--On, Company: BP Amoco Field: Prudhoe Bay Site: PB DS 05 Well: 05-28 Wellpath: 05-28A Date: 11/1/2001 Time: 15:33:58 Page: 1 Co-ordinate(NE) Reference: Well: 05-28. True North Vertical (TVD) Reference: 53 : 28 8/22/1991 00:00 70.0 Section (VS) Reference: Well (0.00N,O.00E.345.00Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Field: -- _h__--__-__h______------- ----------------------------------- ----------------------------------.----------------------.------------------------------....------ ----- --.. ----.------------.--.---------..-- -- -------- ---------- - -------_.._---_.._----- ---------..-------------.-------------------------------------____m__..--__---------------------- --- - -- Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 ! Geo Datum: NAD27 (Clarke 1866) ~ Sys Datum: Mean Sea level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2001 ------- -----------------------_.._---------------------~---------------- --- n"_____-------------------------------------,,---------------------..- - --..-..--- --..- ..---------------..----------- -------------..----------------------------..-....------..---..----------------------___-.._n -----..-- - - PB DS 05 TR-11-15 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft ¡Site: I I I ! 5947204.70 ft 697428.91 ft Latitude: 70 15 35.696 N Longitude: 148 24 14.424 W North Reference: True Grid Convergence: 1.50 deg -..-- -..--- ------------------.--..-.---.-----------...------- ------------- -------n-____-------------- ---------_--____n_---____------------______n______----------n - ------ __n_----- -- - --- __--_n_- - -------------------------------------..--------..---------------._---------------------------------------------------------------------.. ---- ----------.------------------__...___n____- ---..--- ------------------------ ----------- Well: 05-28 05-28 Well Position: +N/-S 1814.57 ft Northing: +E/-W 747.76 ft Easting: Position Uncertainty: 0.00 ft 5949038.14 ft 698128.80 ft Slot Name: Latitude: Longitude: 28 70 15 53.542 N 148 23 52.662 W ---- -------..-..---..-..--..------------------------- -_..------ ---------------- -- - "-----------------------------"------_____.n______-----------_-n--_..---..-.._-------------- -- -------------------'-_._-______m- - -------------------- - -..--- -------..------- ---.. -....---..----------.--------------------,---..----------------------------------------------------.--.------------..---------------_.._---_.._--------------------------u--,---,-----------------------------------..--- -- ____n______---------.. - ----______n____- - --- - -. -- - --- - Wellpath: 05-28A Drilled From: 05-28APB1 500292220801 Tie-on Depth: 11490.00 ft Current Datum: 53 : 28 8/22/1991 00:00 Height 70.00 ft Above System Datum: Mean Sea level Magnetic Data: 7/30/2001 Declination: 26.75 deg Field Strength: 57507 nT Mag Dip Angle: 80.80 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg -..- --------------------------------------- ----------------.----- --------_u_-------------------------------------------------- ----- ---- -------_.---- ----------- -------------.._------ ------- --- 0.00 0.00 0.00 345.00 Survey: - -----------..--....- ---------..-----..----------------------- ---... -----------------------,--------------.---------.------------ ---------..-------------------..----______n______------..--------------..----------..---------- ----- -_..-- 10/27/2001 --..---- - - ------..--.. ..- -----------------....----------------,----------.-----...------_.._------,----------------------------------------- -..--..-------------.--..---------..-------------------------------------------_..---------------- MWD Company: Baker Hughes INTEQ Tool: MWD,MWD - Standard Start Date: Engineer: Tied-to: From: Definitive Path Annotation ----- ----- -------------------------- ..---------------------------------------- --------- -------- -------------------------------- ------------------------ ---------------------------- Survey 8808.91 8791.42 KOP TD ------ ----. -------- ..- - -----'---"'-'- -----..------------------.--- -- ..--------------- _--__--_m...__- - -- --------------"------------'-----"--"""----"-~-":"----'--"--""--"------'-"'------------.--------'---'--"--"---."'-'---"'--'-----_":-----"-'-------....~_.._-_.._--------,----------:,-,,--"-'-~--¡--'---:-"--"-'----'-""-"-------.--"'-'--:---.---'r--"----------------,"-,'-"----- ----,------------..----------'---' -,-- MD bad, Aziul, TVD SSTVD, ,N/S, 'ELW"MIJPN. MapE DLS - - - --..-- ----,-~----- ._,--_.._,-_.._,--~~.~._---_._:_.,----_..~,~~--_._-- ----,.,_..,----~t_..._--_.:_-_.._:---,-_:.!~-~, --~-,---_.._,.._,.--.~--_..__.._---_._~----_._----~~-~_._.,--._----_.._--~---,-_!!.~:_,- --:-------..- ---_._,- --,---~~---_.._....._-"...._----~~~~~-g~~-- -- 11490.00 92.87 333.25 8808.91 8738.91 6061.30 -1421.27 5955059.61 696548.60 0.00 11528.11 87.54 321.36 8808.77 8738.77 6093.30 -1441.81 5955091.06 696527.22 34.18 11585.86 96.50 320.66 8806.74 8736.74 6138.12 -1478.09 5955134.90 696489.78 15.56 11613.49 98.70 320.30 8803.09 8733.09 6159.24 -1495.51 5955155.56 696471.80 8.07 11650.44 98.44 326.63 8797.57 8727.57 6188.59 -1517.25 5955184.32 696449.30 16.95 11695.29 11732.24 11761.19 11791.94 11825.39 11857.59 11903.31 11936.34 11968.54 12006.44 12036.77 12069.57 12096.84 91.49 87.98 87.54 89.30 90.79 89.65 92.64 88.51 93.78 95.10 96.50 93.87 90.53 331.55 332.96 337.88 340.34 343.51 347.02 348.08 352.30 353.70 356.87 359.68 2.49 1.79 8793.69 8793.86 8795.00 8795.84 8795.82 8795.69 8794.78 8794.45 8793.81 8790.87 8787.81 8784.84 8783.79 8723.69 8723.86 8725.00 8725.84 8725.82 8725.69 8724.78 8724.45 8723.81 8720.87 8717.81 8714.84 8713.79 6226.89 6259.59 6285.89 6314.60 6346.39 6377.53 6422.16 6454.69 6486.63 6524.29 6554.44 6587.10 6614.32 -1540.18 -1557.37 -1569.40 -1580.36 -1590.74 -1598.93 -1608.78 -1614.41 -1618.33 -1621.43 -1622.34 -1621.72 -1620.71 5955222.00 5955254.23 5955280.20 5955308.62 5955340.13 5955371.03 5955415.39 5955447.76 5955479.58 5955517.14 5955547.26 5955579.92 5955607.16 696425.38 696407.33 696394.61 696382.90 696371.69 696362.69 696351.66 696345.19 696340.42 696336.33 696334.63 696334.39 696334.69 18.96 10.24 17.05 9.83 10.47 11.46 6.94 17.87 16.93 9.04 10.31 11.71 12.51 \IS ft -----------,,-_._---------- -.._--.,--...._--- 6222.62 6258.85 6311.52 6336.44 6370.41 6413.34 6449.37 6477.89 6508.46 6541.86 6574.05 6619.71 6652.59 6684.46 6721.63 6751.00 6782.38 6808.41 -------------_.._------..- -....- - - ------,.--------------..--..------------------------------------------------------------------------------....---------------------------------- -------------------..----------.------------- ObP ( BP Amoco Baker Hughes INTEQ Survey Report (' Bii8 -=- lNT EQ .. - --- - -- --- ---- -- m_- -- - -- - - - -- -- ------ --- ----, Company: BP Amoco Field: Prudhoe Bay Site: PB DS 05 Well: 05-28 Wellpath: 05-28A Date: 11/1/2001 Time: 15:33:58 Page: 2 Co-ordinate(NE) Reference: Well: 05-28, True North Vertical (fVD) Reference: 53 : 28 8/22/1991 00:00 70.0 Section (VS) Reference: Well (0.ooN,O,00E,345.00Azi) Survey Calculation Method: Minimum Curvature Db: Oracle : - - --------------------------------- ----------------------------------- ----------______m______------- ---- ------ ------___n_.--.- Survey ----------------------------------------------- ___m_- ------m----_-------- ----------------------- --.------- --------------------------------.---------- __n --------------- _--__n____n______--------, MD Incl Azim TVD SSTVD N/S E/W MapN MapE DLS VS ft deg deg ft ft ft ft ft ft deg/100ft ft ----------- ------__n__--___- --------- -------------- ------ -------- --------- 12129.37 86.57 356.16 8784.62 8714.62 6646.82 -1621.29 5955639.63 696333.25 21.15 6839.95 12165.87 84.20 350.89 8787.56 8717.56 6682.95 -1625.38 5955675.64 696328.20 15.79 6875.92 12201.99 87.71 350.89 8790.10 8720.10 6718.52 -1631.09 5955711.04 696321.57 9.72 6911.75 I 12235.00 87.71 350.89 8791.42 8721.42 6751.09 -1636.31 5955743.46 696315.49 0.00 6944.56 --- -----------. - .----_____n____u_---------- --- - --- u_-- ---------.. - --- ------ -- ------ _. Rig: Ref. Datum: V.Section Angle 345.00' WELLPATH DETAILS 05.28A 500292220801 05-2BAPB1 11490.00 Nordic 1 53 : 28 8122/1991 00:00 70.00ft 7100 7000 6900 Origin +EI.W Starting From TVD 0.00 0.00 0.00 REFERENCE !NFOHMAT!ON We!! Centre: 05-28, True North System: Mean Sea Leve! Slot - 28 (O.OON,O.OOE) 53.288/22/1991 00:00 70.00 Minimum Curvature ANNOTATIONS TVO 873891 11490.00 KOf' 872142 12235.00 TO 8250 8300 8350 8400 8850 8900 8950 9000 MD Ao,ol'lioo 6800 6700 :?,600 =6500 0 0 OF' 6400 .... +6300 :c 1::6200 0 ~6100 !6000 :::; ~5900 5800 5700 5600 5500 5400 LEOEND Wellp,lh (O5-281O5.28A) Dale 1111/200! -2500-2400-2300-2200-2100-2000-1900-1800-1700-1600-1500-1400-1300-1200-1100-1000 -900 -800 -700 -600 -500 -400 -300 -200 -100 West(-)/East(+) (100ftlin] 0 100 5250 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900 5950 6000 6050 6100 6150 6200 6250 6300 6350 6400 6450 6500 6550 6600 6550 6700 6750 6800 6850 6900 6950 7000 7050 7100 7150 Vertical Section at 345.00. 11/1/2001 3:29 PM I ~u~uŒ (ill~ ~~~~[K\~ ( ALAS IiA 0 IL AND GAS CONS ERVATI ON CO MMI SSI ON / TONY KNOWLES, GOVERNOR 333 W. TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Alistair Sherwood CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage AK 99519 Re: Prudhoe Bay Unit 05-28A BP Exploration (Alaska) Inc. Permit No: 201-195 Sur Loc: 2431' SNL, 4220' WEL, SEC. 32, TIIN, RI5E, UM Btmhole Loc. 4420' NSL, 432' WEL, SEC. 30, TIIN, RI5E, UM Dear Mr. Sherwood: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe Bay Unit 05-28A Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, ( ß^^'"^'J~'~ c~~;f~~sli Taylor Chair BY ORDER OF THE COMMISSION DATED this 3rd day of October, 2001 jjc/Enclosures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ", f (' STATE OF ALASKA { ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 MC 25.005 I~II\~' ,\ , JP ,.)1) J<flD( '\0\ L' f) I ~ 17,.) /Q/cl</~/ 1 a. Type of work 0 Drill II Redrill 1 b. Type of well 0 Exploratory ~ratigraPhiC Test II Development Oil 0 Re-Entry 0 Deepen 0 Service 0 Development Gas Si K1le Zone 0 Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. RKB = 70' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028326 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2431' SNL, 4220' WEL, SEC. 32, T11 N, R15E, UM Prudhoe Bay Unit At top of productive intelVal 8. Well Number 3081' NSL, 5006' WEL, SEC. 29, T11 N, R15E, UM .... Number 2S 100302630-277 At total depth 9. Approximate spud date 4420' NSL, 432' WEL, SEC. 30, T11 N, R15E, UM '-.' Amount $200,000.00 ,~' " 12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028321, 858' MD No Close Approach 2560 12300' MD / 8740' TVDss 16. To be completed for deviated wells 0 17. Anticipated ~O AAC 25.035 (e) (2)} Kick Off Depth 10560' MD Maximum Hole Angle 90 Maximum surf. ", ,. , At total depth (TVD) 8800' / 3200 psig 18. Casing Program Specifications Setting Depth Size TOD Bottom Quantitv of Cement Hole Casino Weiaht Grade CouDlina Lenath MD TVD MD TVD (include staae data\ 311 2-3/811 4.6# L-80 ST-L 2450' 9850' 8053' 12300' 8740' 83 sx Class 'G' I" i "" ,,'I ,I '..,'" ' " \¡),.: I,;, <,' ." '", ! '"I ,: 19. To be completed for Redrill, Re-entry, and Deepen Operations. (~ ':.. ""\ r,~ (:;: ')c'r " "- i. Present well condition summary ,J£_t k. ,,;I ¿:.J L i Total depth: measured 10928 feet Plugs (measured) true vertical 8975 feet ,,' ,CI: Effective depth: measured 10840 feet Junk (measured) true vertical 8903 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 11 Yds Arcticset 110' 1101 Surface 3916' 10-3/411 1265 sx CS III, 350 sx Class 'G' 3916' 3534' Intermediate w/ Top Job: 90 sx CS II Production 10150' 7-5/811 815 sx Class 'G' 10150' 8356' Liner 1086' 5-1/211 95 sx Class 'G' 9837' - 1 0923' 8113' - 89711 Perforation depth: measured Open: 10702' - 10733' Sqzd: 10690' - 10697' true vertical Open: 8792' - 8817' Sqzd: 8782' - 8788' 20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Alistair Sherwood, 564-4378 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the fO~~ ~~n~ i~ tr~ c:'r~,vto the be~t of my knowledge, Date 1/ufó! Signed Alistair Sherwood r , )l¡}¡Ú/..A.7 r ¿fy~~?J/l . Title CT Drilling Engineer '::: '~;,:~~,T~:~,":,TT1.:;:,:!::,:!;i>;::';:".:',:i;;:;;'; I.;::;i::!~,: i:i: ,iii::,'::;i,;:>:!: ;!¡\,: ;:';¡:'?¡:¡':"ii:;,:¡ ;:'::,..i:::i,;;;::;:!:,!i:Øqmmi~~:~~~l:!g'$ij:'¡Ø~J'~';!:;l::::!"i!:::i::,'::: ::,:c:'¡:::::¡i:i'¡):':,':,"::':¡:,';::: ,j:::,':;: '::.:::;;. :!,' :;:::,ii:':;;:::; '.', "::!':i?;::.,:,....:: :,;'.",.:" .::i.,':::::./:':,::'::. ;, 'i:;:';,;, ;,; Permit Num~r I c¡ S API Number ^fl)~ v~ CI~~\ See cover letter ZD ,..-,. . 50- 029-22208-01 for other reQuirements Conditions of Approval: Samples Required DYes iii No Mud Log Require ~ DYes [I' No Hydrogen Sulfide Measures I)D Yes DNo Directional SulVey Required Ii'Yes DNo Required Working Pressure for BOPE D2K D3K D4K D5K D10K D15K ~5K psi for CTU Other: ,., by order of <tr~ginal SilO ~.(: IYI h II\J A I \n ~ \ Accroved Bv Commissioner the commission Date 0 Form 10-401 Rev. 12-0t'~ IllY - Subm't In Tri licate p ( ( BPX 05-28a Sidetrack Summary of Operations: A CTD sidetrack of well 05-28 will be drilled. Specific Prep Work, (Phase 1) and Drilling, (Phase 2) operations are detailed below. Phase 1: Isolate & integrity test inner annulus, (IA). Drift tubing and tag PBTD in liner. Set a cement plug for kickoff. Planned for October 5, 2001 . Run DGL V's. Liquid pack and integrity test the IA. . Drift well and tag as deep as possible with slickline. . Sa:t~~?~j~.1~t:~pJ~~?f~rw'i!ð:17:f;":(PBtÐri(fapproxi'fnåtely,'1 0 ,485' ,"Fl3Q~')i;~niçb, :i~..? ~'r~,9g\lØ ' the::~"([JÞ.~'af'~Ö:'5'6'O",'-~(ä';6ð8~::.:IV-P.~~~).:-""" ,'. .". ,.,"" Phase 2: Drill and Complete CTD sidetrack: Planned for October 11, 2001 2" coil will be used to mill a casing window, drill a 1,740',3" open hole sidetrack, (as per attached plan) and run a solid, cemented & perforated 2%" liner completion. Mud Program: . Phase 1: Seawater . Phase 2: Seawater for milling and Flo-Pro (8.6 - 8.7 ppg) for drilling Disposal: . No annular injection on this well. . All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. . All Class I wastes will go to Pad 3 for disposal. Casing Program: . 2%", L-80, solid liner will be run from 9,850'md (TOL, 8053' TVDss) toTO at approximately 12,300'md. Liner will be cemented to approximately 550' above the window with approximately 17 bbls (annular volume plus 25% excess in OH) of 15.8 ppg class G cement. Well Control: . BOP diagram is attached. . Pipe rams, blind rams and the CT pack off will be pressure tested t(jijr" ..,' . The annular preventer will be tested to 400 psi and 2,200 psi. Directional . See attached directional plan. . Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging . An MWD Gamma Ray log will be run over the open hole section. . A memory CNL will be run inside the liner. Hazards . 05-28 flow stream was last sampled at 8ppm H2S in Nov 96. Drillsite 5 is not an H2S area. . The well path will cross two mapped fault either side of a graben. The fault throw associated with this structure is estimated at 10-15ft. Lost fluid circulation is not anticipated. Reservoir Pressure Reservoir pressure is e.§!jJp!~t~~~~~ø"be 3,200 psi at 8,800ss. Maximum surface pressure with gas (0.12 psi/ft) to surface is~f1'f4r4-~p'i3i. ' . TREE= FMC ULTRA SLIM HOLE WELLHEAD = FMC ACTUA TOR = BAKER. C KB. ELEV = 70' BF. ELEV = KOP= 1329' Max Angle = 45 @ 9100' Datum MD = 10798' Datum TVD = 8800' SS 4-1/2" TBG, 12.6#,13-CR-80, -1 0.0152 bpf , ID = 3.958" 1 TOP OF 3-1/2" TBG 1 2987' 2987' 110-3/4" CSG, 45.5#, J-55, ID = 9.953" 1-1 3916' Minimum 10 = 2.75" @ 9900' OTIS XN NIPPLE TOPOF 5-1/2" lNR 1 9837' 13-1/2" TBG, 9.2#, 13-CR-80, .00870 bpf , ID = 2.992" 1 7-5/8" CSG, 29.7#, l-80, ID = 6.875" 1-1 ÆRFORA TION SUMMA RY REF lOG: BHCS on 09/04/91 ANGlEAT TOP ÆRF: 39 @ 10690' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 4 10690 - 10697 S 09/26/91 2-1/2" 4 10702 - 10733 0 09/26/91 05-28 9911' 10150' 1 8 2238' 2987' (' SAFETY NOTES: CHROME TBG & lNR. ~4-1/2" OTIS HRQ SSSV NIP, 10 = 3.813" 1 -14-1/2" X 3-112" XO 1 GAS LIFT MANDRELS ST MD lVD DEV TYÆ VlV lA TCH PORT DATE 1 3525 3217 36 FMHO RK 2 5992 5195 37 FMHO RK 3 7732 6551 40 FMHO RK 4 8715 7288 44 FMHO RK 5 9264 7678 42 FMHO RK 6 9683 7995 40 FMHO RKP IPBTD I 10840' 15-1/2" lNR, 17#,13-CR-80, 0.0232 bpf,ID=4.892" 1 10928' 9810' 9900' 9910' 9911' 9896' DATE REVBY COMMENTS DATE REV BY COMMENTS 09/08/91 ORIGINAL COMPLETION 01/12/01 SIS-Sl T CONV ERTED TO CA NV AS 02/09/01 SIS-lG REVISION 07/18/01 RN/KAK CORRECTIONS -17-5/8" X 3-1/2" BAKER SB-3A PKR 1 -13-1/2" OTIS XN NIP, ID = 2.75" 1 1-13-1/2" BAKER SHEAROUT SUB 1 -13-1/2"TUBINGTAll 1 1-1 ELMD IT lOGGED 09/22/91 I PRUDHOE BA Y UNIT WELL: 05-28 ÆRMrr No: 91-110 API No: 50-029-22208-00 Sec. 32, T11 N, R15E, 5032.87 FEL 2034.62 FNl BP Exploration (Alas ka) TREE= FMC ULTRA SLIM HOLE WELLHEAD = FMC ACTUA TOR = BAKER C KB. ELEV = 70' BF. ELEV = KOP= 1329' Max Angle = 45 @ 9100' Datum MD = 107981 Datum TVD = 8800' SS 05-28A PROPOSED CTD SIDETRACK 4-1/2" TBG, 12.6#, 13-CR-80, -1 0.0152 bpf , ID = 3.958" 2987' 110-3/4" CSG, 45.5#, J-55, ID = 9.953" 1-1 3916' Minimum 10 = 2.75" @ 9900' OTIS XN NIPPLE TOPOF 5-1/2" lNR 1 9837' I 3-1/2" TBG, 9.2#, 13-CR-80, .00870 bpf , ID = 2.992" 1 7-5/8" CSG, 29.7#, l-80, ID = 6.875" 1-1 I Top of 17ppg Cement Plug Whipstock 1 (Perf's to be P&A 'd prior to Sidetrack) PERFORA TION SUMMA RY REF lOG: BHCS on 09/04/91 ANGLE AT TOP ÆRF: 39 @ 10690' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 4 1 0690 - 10697 S 09/26/91 2-1/2" 4 1 0702 - 10733 0 09/26/91 2238' 8 2987' ( I SAFETY NOTES: CHROME TBG & lNR. ~4-1/2" OTIS HRQ SSSV NIP, 10 = 3.813" 1 -14-1/2" X 3-112" XO 1 GAS LIFT MANDRELS ST MD TVD DEV TYPE VlV lA TCH PORT DATE 1 3525 3217 36 FMHO RK 2 5992 5195 37 FMHO RK 3 7732 6551 40 FMHO RK 4 8715 7288 44 FMHO RK 5 9264 7678 42 FMHO RK 6 9683 7995 40 FMHO RKP 9810' -17-5/8" X 3-1/2" BAKER SB-3A PKR 1 I Planned KOP 1-110560'1 13" Hole I I ¿-3.8" l-80 LlNFR Cemt-1nlc~d & Perforaled I Perfs P&A d w. Ccrrent to WS DATE REVBY COMMENTS DATE REV BY COMMENTS 09/08/91 ORIGINAL COMPLETION 01/12/01 SIS-Sl T CONVERTED TO CANVAS 02/09/01 SIS-lG REVISION 07/18/01 RN/KAK CORRECTIONS 07/20/01 pcr 05-28A proposed ST PRUDHOE BAY UNIT WEll: 05-28A Proposed ST ÆRMrrNo: 191-110 API No: 50-029-22208-01 Sec. 32, T11 N, R15E, 5032.87 Fa.. 2034.62 FNl BP Exploration (Alas ka) BP Amoco WELLPATH DETAILS PIoII#3 0S-21A 500212220101 Par... W.llpatll: TI. .. MD. RIO: Rof. D.ho... 0S-21 10510.00 53 ,21 112211111 00000 70.000 v.s.ctio. AGO'. US.OO' Drill'" +NJ-S 0.00 ~~\; Sto-o From TVD 0.00 0.00 REFERENCE INFORMATION Co-ordinate (NÆ) Reference: Well Centre: 05-28, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: Slot - 28 (O.OON,O.OOE) Measured Depth Reference: 53: 28 812211991 00:00 70.00 Calculation Method: Minimum Curvature SECTION DETAILS So< 010 ... "" TVO +IU-S +E1-W DLeI u... vSec T...." 1 10552.20 37.13 350... alO2.22 5453.71 -796.01 0.00 0.00 5473.91 2 10560.00 37_13 350'" ....... 5458.... .796.a. 0.00 0.00 5478." 3 10570.00 ...44 340.3a "'8.35 5464... -7117.82 20.00 310.00 54&4.70 . 10850.27 10.00 322.30 a735.71 5&TT.1O -91 o.2a 20.00 320.00 5720.03 . 11..0.27 10.00 202.30 a735.71 5a57.a1 ."..... 10.00 -90.00 ....... 0 "150.27 10.00 12.30 a735.79 8509.70 -1"'_0' 10.00 90.00 6673.23 7 1200D.27 10.00 7.30 a735.71 855.... -1480.14 10.00 270.00 8718.01 a 12085.27 87.10 350.30 a737.94 """77 .1475.25 10.00 -"0.00 6799.21 9 121a.... 10.00 351.40 a740.O7 8727.57 -1482.07 10.00 -70.00 ..a1.03 10 12300.00 10.00 338.34 8740.07 8853.33 ...,8.0T 10.00 -90.00 7012.19 ANNOTATIONS TARŒrOETAL> TVD Nam. .w.s <£I'" ...... 1VO OlD AG..totio. 1802.22 10552.20 TIP 1801.44 10510.00 KOP 1111.:05 10570.00 1 1735.71 10850.27 2 1735.71 11150.27 3 1735.71 11150.27 4 1735.71 12000.27 5 1737.84 12015.27 1 1740.07 12111... 7 1740.07 12300.00 TD ""'AT1.1 B135.00 5091.94 .1065.58 Pori ""...712 6135.00 5"B.26 -1302.67 Pon ...,...TU 6135.00 6251.05 .1405.11 Pori OS-2BATU 8"".00 6655.65 .1575.81 PO>< ""'A715 8""00 0797.17 -163194 Pori Q5.2BA71' 67...00 7171.5<> .179222 Pori 8150 8200 8250 8300, - .5 8350 = 0 8400 II) - .c 8450 .. ~ GJ 8500 Q . Ci 8550 U :e 8600 GJ > 8650 GJ 2 8700 to- 8750' +u 8800u, 8850 8900 545055005550560056505700 5750 5800 5850 5900 5950 6000 6700, - C ~ 6600 II- 0 0 6500, ... - -6400. + . - . ~ 6300 0 Z 6200 . - - 1 ~6100 .. :S6oo0 0 en 5900 Of) , LEGEND 05-16 (05-16) ..u- 05-16A (05-16A) 05-16B (05-16B) 05-28 (05-28) uuuu Plan#3 05-28A Plan #3 T tl t6 ¡ Plan#3 05-28A: 4cc.!!2J '~--;71 '--ili r¿j ,'--¡'4l ! 05-28A T1.3, ~ Azimuths to True North Magnetic North: 26.75° Magnetic Field Strength: 57507nT Dip Angle: 80.80° Date: 7/30/2001 Model: BGGM2001 I 05-28A T1.2i ¥ '.r ~ 5500 Plan: Plan #3 (05-28/Plan#3 05-28A) Created By: Brij Polnis Date: 7/30/2001 fC. i f,,;,.. . " . ,-.,-'.j "'. " '- ¡05-16(05-16)1',. ...,....~ 11NTEQ T 7100'-:-; 05-~~~,(~5-16B): ", ¡ 05-16A (05-16A)) 7000, ---- -- - Cnnlacllnf;;rm~ti(jn DH';GL (~107; 2trl-C613 E.maiL 'urij.po:ni"..rWlr,tcq.wm DCi,er HlIvi1es INTEO' ¡907i :?Gï-fo::;;') ~u ß r-I'ÕS:28 (05-2j)J i i \ i f<l1 ,\~ \/!KO~ ~ \~ -2700-2600-2500-2400-2300-2200-2100-2000-1900-1800-1700-1600-1500-1400-1300-1200-1100-1000 -900 -800 -700 -600 -500 -400 -300 -200 -100 West(-)/East(+) [100ft/in] -. [3l ."".., ""., " '",.,. "'-"'s. '~-..< r u:u" +~_..:;;-- u -~=::-===:~ ... '..'.' . ! 5 ~. "~'/~"C=' t \ÌT5l. TO .. ". j , , ~8AJ . . : '. .~ I 05-28A T1,5: L.Plan#3 05-2_- I 05-28A T1.4¡ '" '", I 05-28A T1.6¡ " ". 6900, 6800 5800 '. 5700, 5600 "-'-. """--"hU......, i°5-16A (Ós:.16Aj:r "'1 0~16B_{05-16BÚ'\ 05-28)( 1 6200625063006350640064506500655066006650670067506800 6850 6900 6950 7000 7050 7100 7150 7200 7250 7300 7350 7400 Vertical Section at 345.00. [50ft/in] --- -1/30/200-1 1-1 :43 AM ( f ObP BP Amoco Baker Hughes INTEQ Planning Report Biï8 IIA.ICD. HUGIll S -----------.---.-.--.--.....-..- lNT.EQ --. - .-- -- . - . -.-- -.- .- .-- - --- ---- ----- -..--. _n - -- ! Company: BP Amoco Date: 7/30/2001 Time: 11 :43:26 Page: ¡ Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 05-28, True North i Site: PB DS 05 Vertical (TVD) Reference: System: Mean Sea Level i Well: 05-28 Section (VS) Reference: Well (0.00N,O.00E,345.00Azi) L -~! ~~~~~:.- - ~!~.~.~...~. ~~ ~ ~ ~--_. ----.-...-- -.... - .... -...-- -.-. - -- ___._n.....n --. m _m.- - -- -- - - _n- --- -- ..-._...... ~.~ ~ ~~. -~~! .~~~ ~ ~ ~ --~ -~ ~~ -~.~ ~...... -m -~~ ~~ ~ ~~._~.~-~ ~ ~ ~ ~~ --. -. - m - - n- ~-~ :- --9. ~~.~~---- -.. -oo - ; .____m___...- ----------..----.-----..----.--------- ------------------... - ---------- ----._-.._-------_u_-------_...----~---------------..._------.-----.---------------- ------n____..._- ! Field: Prudhoe Bay I North Slope : UNITED STATES ¡Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) l_~.~~~-~~~_:_!'-'1e.~~-~-~~ -~_:.~~~-_...- -----..-- - ----------- 1 Map Zone: Alaska, Zone 4 Coordinate System: Well Centre i ._-_._--_..._-----_....~~~mag~.!~~~~_~~el :_----~-~~~~_?!!..1......._- ------- - - - - -.. - ------ ----j ---_..-------------._-- -------------.-- ---------------.---"'------.--------.--'--------_.____n-----------.--- ----- -_--."'_m_____- -- ....------.------------.- -.-- -------- ----------.---- PB DS 05 TR-11-15 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft Site: 5947204.70 ft 697428.91 ft Latitude: 70 15 35.696 N Longitude: 148 24 14.424 W North Reference: True Grid Convergence: 1.50 deg --.-----.----------.--...-- -.- . ----------- n_n- -----.---.-.-...-.----- - --....- ------..--. --------.-.-------.---.-.--...--..----.--------------.-----______n_--____------------- --------. _._---.-.- ----_..._._~_...._- --------------...---------- .-----..---.---.----..-------...--------.----------- -----.-- .---- -.- ---.------------ ..- ---------- _._------------_._----~------------_.- Well: 05-28 05-28 Well Position: +N/-S 1814.57 ft Northing: +E/-W 747.76 ft Easting: Position Uncertainty: 0.00 ft Slot Name: 28 5949038.14 ft 698128.80 ft Latitude: Longitude: 70 15 53.542 N 148 23 52.662 W .- --- --- .. - .----- - .-.- - .----. -------- -- -- - ... --..-- _n.. .- -. -- . --------------- ----. ----.-----.-- .-----.--------.---...------------.-.--------------.------_.._._._--~_...- -----_.- - . -- -.--- ..... -- ... _m_._- -- ...... -- '---------m--.----..'-." - --- -.--------...----.-------.-.-.--.-.------------.--..- ---..-.--.--..-.--- - --.-.----.----.----.....----.--......---.. _____n.-____------------.-------- .---...-----------..--.--.----..----- Wellpath: Plan#3 05-28A 500292220801 Current Datum: 53 : 28 8/22/1991 00:00 Magnetic Data: 7/30/2001 Field Strength: 57507 nT Vertical Section: Depth From (TVD) ft -----..---.---.------ ._m_-.-- 0.00 Height Drilled From: Tie-on Depth: 70.00 ft Above System Datum: Declination: Mag Dip Angle: +E/-W ft .------.---..-----.-------.----..-----..-..--------.- _no. 0.00 05-28 10560.00 ft Mean Sea level 26.75 deg 80.80 deg Direction deg -. --.----'-'-------.-----.--.-. --'-...'--____._n_'____----.- 345.00 ---.-.--.-. ----....-...---- ------------......-..-- +N/-S ft ...--.----. _.__m_____.-.--.---..------.-----..------ 0.00 -.--------.---..-----.- -, .-------. -.---.. - --..-.--------..--.---------...-----.-.--------- .----.----.--..-.-.-..--..-..------.--------------------------""-.----------.---------------.---.------..--...-...-._-..-....----_. [;~~~~~1=~~3~~~~- ~=~--=~--- ~~:~~ ~_~~-=~r;1;~~~d'~:~~~~!::;:~~~~~~~~~-~- _:.._-- Targets r:'.'...'.'.'.."'.-""""""'..""."..""""'.""""'.'.'.""'.._.m"'."""""'.'~.',...oom...,........oo...........__...._........."'-"""'-""."-'.'U'-..-.-_u...u............_m.....m................--_uu-""""."-'_._......m__'___'--'-----'-.""._"""h""""",.,.,,moo...... -.............. ." ." . .... .oo .... ... Map 'lap <---- Latitude ----> <--- Longitude ---> Name Description TVD +~/-S +E/~W Northing Easting Deg Min Sec Deg MiD See : .ft .ft.. ..ft . .ft..ft ... - ........ .........-... - .-.. ___..m._..__-.... .... -"'-'.--'--'.--...-. --- .--- oo"'-- --'oo. -..-.. .--..-..- --.- -.. -".-.. ..----.-..- _.m_._.__-. _"'_._m'__"",,- -.--.. -.....- .....- ...--.-....- ---...... "--- - -- ..-. ...-..-....- -..- ---........-.. .._........n --.- -...-"u .-- _m_.._.... 05-28A T1.1 8735.00 5691.94 -1065.58 5954699.76 696913.86 70 1649.521 N 148 24 23.697 W -Plan out by 171.46 at 8735.00 5660.35 -897.05 5954672.61 697083.15 70 16 49.211 N 148 24 18.788 W 05-28A T1.2 8735.00 5998.26 -1302.67 5954999.72 696668.80 70 16 52.534 N 148 24 30.604 W -Plan out by 527.94 at 8735.00 5660.35 -897.05 5954672.61 697083.15 70 16 49.211 N 148 24 18.788 W 05-28A T1.3 8735.00 6251.05 -1406.11 5955249.68 696558.76 70 16 55.020 N 148 24 33.618 W -Plan out by 779.79 at 8735.00 5660.35 -897.05 5954672.61 697083.15 70 16 49.211 N 148 24 18.788 W 05-28A T1.4 8740.00 6655.65 -1575.61 5955649.66 696378.68 70 16 58.999 N 148 24 38.557 W 05-28A T1.5 05-28A T1.6 8740.00 8740.00 6797.17 7171.50 -1631.94 5955789.64 696318.64 70 17 0.390 N 70 17 4.071 N 148 24 40.199 W 148 24 44.871 W -1792.22 5956159.60 696148.58 .. ...."---'...-.-"---"--m--.-......---"'..'--.'.-'..-. '- -'-"'-.--."-."-.'---'.--.---"--".".-....-,-..-""",-,,-.-------------.-.-...-..--.--- -..'- ---..--..-..--...---......-.. -..----...........--.--.......-.. "."-----'--'-_..._"n"_____-"-"'--.""-,,. .-....-.. _..n_..._..-. ...--.--.-.----. Annotation I ... - -. oo... ... ~~.. ..... ........~... ~ ~.~_.... ... .....n m.. - -....... ... -.. .~.~~'--.-=-~ . .... - ...-....... - ...--=- . -- ~. ..==.=.=~.---~ -:. _...~.~-- ='~'oo'~-.-.~.-~'.~-'~"~.~'~'-'.:. oo- ..~:--.~-.~~-.".~.-.--~'- -=.-~~'-..-.-:.- -=.--=~'.~"': ..~~...-- .'=.--"".'.'--:=~".-.~'-:-"~.'~ ~'~.~.-] 10552.20 8602.22 TIP 10560.00 8608.44 KOP 10570.00 8616.35 1 10850.27 8735.79 2 11150.27 8735.79 3 11950.27 8735.79 4 12000.27 8735.79 5 12085.27 8737.94 6 12169.45 8740.07 7 12300.00 8740.07 TD --..... .- ,--"-",.,,..---- ---~_.._-----.._- ----_u..- ...__n_..._.--..---..-..- nn ....'---'..--"-'----'-"---.--.-..--.-.--.oo.-----.--.-- - .---_.. ----... --'.. .---n__._' ObP (' ( BP Amoco Baker Hughes INTEQ Planning Report Ríi8 8AICD HUGIIIS """"-"""-""""""""""""-""-".. INTEQ r"'" .. . "" . ... .... ¡Company: BP Amoco ! Field: Prudhoe Bay I Site: PB OS 05 i Well: 05-28 I Well path: Plan#3 05-28A l.....................................................................................................................................-...........................................................'-"""-""""""""""" """""-""""""""""..."""'-'-""""""""""""""""""""""""""'"-...................h..........................................................._............"""""""""""""""""""""""""""..-...................' Plan Section Information ¡--.... MD Incl Azim TVD +N/~S""-"--¡E¡:W"'--"'---"DLS-"-B~ild-"'-"-'T;~-'-h"'--TFO---T~~get---'--""""'-"---"--"'1 I ft deg deg ft ft ft deg/100ft deg/100ft deg/10OO deg I ,..... .. ...... ..............-.......... ........ ....-. ..-....... ....... ..-.......... .....................- .-..... ...-......... -""""-' -........-...--...................... ......... .........-.............................. .-.................. """""""""" .... ................-....... ........ ..... .......... "'-""".""....'" ........ """" ....... ............................ ..........."""""""'" ...-...'......... ............. ....... .....-..- ..-.... ......, .. 10552.20 37.13 350.84 8602.22 5453.71 -796.06 0.00 0.00 0.00 0.00 ' 10560.00 37.13 350.84 8608.44 5458.36 -796.81 0.00 0.00 0.00 0.00 10570.00 38.44 348.38 8616.35 5464.38 -797.92 20.00 13.12 -24.65 310.00 10850.27 90.00 322.30 8735.79 5677.90 -910.28 20.00 18.40 -9.30 328.00 11150.27 90.00 292.30 8735.79 5857.61 -1146.22 10.00 0.00 -10.00 -90.00 11950.27 90.00 12.30 8735.79 6509.76 -1488.64 10.00 0.00 10.00 90.00 12000.27 90.00 7.30 8735.79 6559.01 -1480.14 10.00 0.00 -10.00 270.00 12085.27 87.10 359.30 8737.94 6643.77 -1475.25 10.00 -3.41 -9.40 -110.00 12169.45 90.00 351.40 8740.07 6727.57 -1482.07 10.00 3.44 -9.39 -70.00 12300.00 90.00 338.34 8740.07 6853.32 -1516.07 10.00 0.00 -10.00 -90.00 ...--........,,-.. Survey .. ..... ...... .- """"""""'-""""-""""""".............."""""""""""""""" .. ...... ..... Date: 7/30/2001 Time: 11 :43:26 Page: 2 Co-ordinate(NE) Reference: Well: 05-28. True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: Well (0.00N,O.00E.345.00Azi) Survey Calculation Method: Minimum Curvature Db: Oracle '....m." ....... - '-"----......"""""",'-... -..-......-..................-..-....--....................-.....-..................--.-..-..-..--.....-..............-.....,,----..--..---....-....-...-..--... """"""""'-""'...-......................."""""""""""""- ....... """"'-"""""""""""""""'..................-.............."""""'-"""""-""""""""---"""""'--"""""""""-"""""""""""'-"""'"""""""""""""""""""""""""""""".......................................-.."""""-""""""""""""'-""""""""""""""""""-"""-"""""""""...-........-- Tool MD ft ".......... "'" 10552.20 10560.00 1 0570.00 1 0575.00 1 0600.00 1 0625.00 1 0650.00 10675.00 10700.00 1 0725.00 1 0750.00 10775.00 10800.00 1 0825.00 10850.00 10850.27 10875.00 10900.00 1 0925.00 1 0950.00 1 0975.00 11000.00 11025.00 11050.00 11075.00 11100.00 11125.00 11150.00 11150.27 11175.00 11200.00 11225.00 11250.00 11275.00 11300.00 11325.00 11350.00 11375.00 11400.00 11425.00 lncl deg .. ""'""".""""',, 37.13 37.13 38.44 39.29 43.63 48.07 52.58 57.16 61.78 66.43 71.11 75.80 80.51 85.23 89.95 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 .AZiril deg .......... ".... ........ 350.84 350.84 348.38 347.54 343.78 340.57 337.78 335.32 333.09 331.06 329.16 327.37 325.64 323.97 322.32 322.30 319.83 317.33 314.83 312.33 309.83 307.33 304.83 302.33 299.83 297.33 294.83 292.33 292.30 294.77 297.27 299.77 302.27 304.77 307.27 309.77 312.27 314.77 317.27 319.77 SSTVD N/S ft ft ................. ....... ...... 8602.22 5453.71 8608.44 5458.36 8616.35 5464.38 8620.24 5467.45 8638.98 5483.47 8656.39 8672.35 8686.73 8699.43 8710.34 8719.40 8726.51 8731.64 8734.74 8735.80 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 5500.53 5518.50 5537.25 5556.62 5576.48 5596.68 5617.05 5637.45 5657.71 5677.69 5677.90 5697.13 5715.88 5733.88 5751.12 5767.54 5783.13 5797.85 5811.68 5824.58 5836.54 5847.53 5857.52 5857.61 5867.48 5878.45 5890.39 5903.27 5917.08 5931.78 5947.35 5963.76 5980.97 5998.96 6017.69 E/W ft .. """.........."" .. - 796.06 -796.81 -797.92 - 798.57 -802.69 -808.20 -815.05 -823.20 -832.57 -843.11 -854.72 -867.33 -880.83 -895.13 -910.10 -910.28 -925.82 -942.36 -959.70 -977.81 -996.65 -1016.20 -1036.40 -1057.23 -1078.64 -1100.59 -1123.04 -1145.96 -1146.22 -1168.89 -1191.35 -1213.32 -1234.74 -1255.58 -1275.80 -1295.36 -1314.22 -1332.34 -1349.70 -1366.26 MapN ft ... """".... ..... ........... 5954468.71 5954473.34 5954479.33 5954482.38 5954498.29 5954515.20 5954532.98 5954551.50 5954570.63 5954590.20 5954610.08 5954630.11 5954650.15 5954670.03 5954689.60 5954689.81 5954708.63 5954726.93 5954744.47 5954761 .22 5954777.14 5954792.21 5954806.39 5954819.66 5954832.00 5954843.37 5954853.77 5954863.16 5954863.24 5954872.51 5954882.88 5954894.24 5954906.55 5954919.80 5954933.97 5954949.02 5954964.92 5954981.65 5954999.18 5955017.46 MapE ft """""""""""" 697189.54 697188.67 697187.40 697186.67 697182.13 697176.18 697168.85 697160.22 697150.34 697139.28 697127.14 697114.00 697099.97 697085.15 697069.65 697069.47 697053.43 697036.40 697018.60 697000.04 696980.77 696960.83 696940.24 696919.06 696897.32 696875.06 696852.33 696829.16 696828.90 696805.97 696783.23 696760.96 696739.21 696718.01 696697.42 696677 .46 696658.17 696639.60 696621.78 696604.74 DLS deg/100ft .. .....' ....... ............ 0.00 0.00 19.97 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 VS ft ".. "'" "...."...... .... 5473.91 5478.60 5484.70 5487.84 5504.38 5522.28 5541.41 5561.63 5582.77 5604.68 5627.20 5650.14 5673.33 5696.61 5719.78 5720.03 5742.63 5765.02 5786.90 5808.23 5828.97 5849.09 5868.53 5887.28 5905.28 5922.52 5938.94 5954.53 5954.68 5970.09 5986.49 6003.71 6021.70 6040.43 6059.86 6079.96 6100.69 6122.01 6143.88 6166.26 TFO deg ...... ""'" ""."........." " ....... ...."......" ... 0.00 TI P 0.00 KOP 310.02 1 328.00 MWD 328.65 MWD 331.48 MWD 333.71 MWD 335.49 MWD 336.91 MWD 338.04 MWD 338.93 MWD 339.62 MWD 340.13 MWD 340.49 MWD 340.68 MWD 340.75 2 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWO 270.00 MWO 270.00 MWD 270.00 3 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD . """"""'---""-""""""-"""""""""""""""""""""'-""'-""""'" - "'---"""-""'-"......."-""""'" ... ...................--.........-.......-......................-............-....-... .............."""""""""""""""""""-""""...--,-"""""""""--""""",,,""""""'-"-""""""'...."-"" .......................-............ ........"" ""'........--""""""""" ObP ( ~: BP Amoco Baker Hughes INTEQ Planning Report Bií8 BAKUt HUGHES ""--'-'--""'-'-'-"-"'-------"-'" INTEQ r"--- .-- ........ ..- j Company: BP Amoco I Field: Prudhoe Bay i Site: PB OS 05 ¡ Well: 05-28 I i Well path: Plan#3 05-28A "--._...............-..-... "'.....--........._"h"""_-'-'-"'..'-"-'-'_'_""h--"--'-"--'...'-'-'-"-""-'-""'-"""""-""""......... mo. - ---"--..""- ,---.-....-.-.-..-- ...--. . .-- --. . -n' _h.._. . .... -.----..---, ..."..-.. .------.----- .- -- .---. ----¡ Date: 7/30/2001 Time: 11 :43:26 Page: 3 Co-ordinate(NE) Reference: Well: 05-28, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: Well (0.00N,0.00E,345.00Azi) ¡ .....- m .. - ,.. "'--"'..m.._.__.- ..--. ..-- ~~. ~.~~-~ ~~~ ~_I.~_~~ ~~. ..~~~~.~~.:- ..----..... -~. ~~.!~.~~. g~ ~~t~~-~._- ........ .-....... !>...~.~._. -g.~~~.I.~--_..........J Survey I.. ..!.._~n~~._~~-~~~_..:t--~=t...~~~_~f~~=~=:~~-=;~1~~--~}~__=~4~~"::.1 ] 11450.00 90.00 322.27 8735.79 6037.12 -1381.98 5955036.47 696588.51 10.00 6189.10 90.00 MWD ; 11475.00 90.00 324.77 8735.79 6057.22 -1396.84 5955056.18 696573.12 10.00 6212.36 90.00 MWD I 11500.00 90.00 327.27 8735.79 6077.95 -1410.81 5955076.53 696558.61 10.00 6236.00 90.00 MWD 11525.00 90.00 329.77 8735.79 6099.27 -1423.86 5955097.50 696545.00 10.00 6259.97 90.00 MWD 11550.00 90.00 332.27 8735.79 6121.14 -1435.98 5955119.04 696532.32 10.00 6284.23 90.00 MWD 11575.00 11600.00 11625.00 11650.00 11675.00 11700.00 11725.00 11750.00 11775.00 11800.00 11825.00 11850.00 11875.00 11900.00 11925.00 11950.00 11950.27 11975.00 12000.00 12000.27 12025.00 12050.00 12075.00 12085.27 12100.00 12125.00 12150.00 12169.45 12175.00 12200.00 12225.00 12250.00 12275.00 12300.00 L____._- 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 89.15 88.30 87.45 87.10 87.60 88.46 89.33 90.00 90.00 90.00 90.00 90.00 90.00 90.00 334.77 337.27 339.77 342.27 344.77 347.27 349.77 352.27 354.77 357.27 359.77 2.27 4.77 7.27 9.77 12.27 12.30 9.83 7.33 7.30 4.98 2.63 0.27 359.30 357.91 355.57 353.22 351.40 350.84 348.34 345.84 343.34 340.84 338.34 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.79 8735.97 8736.53 8737.45 8737.94 8738.62 8739.48 8739.96 8740.07 8740.07 8740.07 8740.07 8740.07 8740.07 8740.07 6143.52 6166.36 6189.62 6213.26 6237.23 6261.49 6285.99 6310.68 6335.52 6360.46 6385.45 6410.44 6435.39 6460.25 6484.97 6509.51 6509.76 6534.03 6558.75 6559.01 6583.60 6608.53 6633.51 6643.77 6658.48 6683.42 6708.30 6727.57 6733.05 6757.64 6782.01 6806.11 6829.89 6853.32 -1447.12 -1457.28 -1466.43 -1474.56 -1481.65 -1487.69 -1492.66 -1496.56 -1499.38 -1501.12 -1501.76 -1501.31 -1499.78 -1497.16 -1493.45 -1488.67 -1488.64 -1483.89 -1480.17 -1480.14 -1477.50 -1475.84 -1475.21 -1475.25 -1475.61 -1477.03 -1479.47 -1482.07 -1482.93 -1487.44 -1493.02 -1499.66 -1507.35 -1516.07 5955141.11 5955163.68 5955186.69 5955210.10 5955233.88 5955257.97 5955282.33 5955306.91 5955331.66 5955356.54 5955381.51 5955406.50 5955431 .48 5955456.40 5955481.21 5955505.86 5955506.11 5955530.50 5955555.30 5955555.57 5955580.21 5955605.18 5955630.16 5955640.42 5955655.12 5955680.01 5955704.81 5955724.01 5955729.47 5955753.93 5955778.14 5955802.05 5955825.63 5955848.81 696520.59 696509.84 696500.08 696491.33 696483.61 696476.94 696471.32 696466.77 696463.30 696460.91 696459.61 696459.40 696460.27 696462.24 696465.30 696469.43 696469.45 696473.56 696476.63 696476.65 696478.65 696479.65 696479.62 696479.31 696478.57 696476.49 696473.39 696470.29 696469.29 696464.13 696457.91 696450.63 696442.32 696432.99 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.02 10.02 10.00 10.00 10.00 9.97 10.00 10.00 10.00 10.00 10.01 10.01 6308.73 6333.42 6358.26 6383.19 6408.18 6433.18 6458.13 6482.99 6507.71 6532.25 6556.55 6580.58 6604.28 6627.62 6650.54 6673.00 6673.23 6695.45 6718.36 6718.61 6741.67 6765.33 6789.29 6799.21 6813.51 6837.97 6862.63 6881.92 6887.44 6912.36 6937.34 6962.34 6987.30 7012.19 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 MWD 90.00 4 270.00 MWD 270.00 MWD 270.00 5 250.00 MWD 250.02 MWD 250.07 MWD 250.15 6 290.00 MWD 290.06 MWD 290.14 MWD 290.33 7 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWD 270.00 MWD 270.00 TO ----"""""-"---'----""_"'h... """"""'-"--""'--'-..--..'-"-'-- -----...------...-----........----....-.-......-......--------- -----.----..-----------..--.-----. --...-.....---.-----".. / .I ( ~ "CT 10.000 psi Pack-off Lubricator Blind/Shear 7 1/16" Pipe/Slips Pipe/Slips 7 1/16" Pipe/Gli~ 7 1/16" JC 5.000 psl t -II . ..... SW AS OR MASTER VALVE :l.tf ~I II :;) I~ :ì II 'f" H 194720 DATE INVOICE / CREDIT MEMO DESCRIPTION "I ( DATE 07/31/01 GROSS VENDOR DISCOUNT ALASKAOILA NET 100.00 I=:. CHECK NO. 1°0194720 00 072701 CK072701K PYMT OMMENT5: HANDL NG INST: Per it To Drill ee 5tH - Terrie Hub Ie TOTAL ~ E ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE, BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 PAY To The ORDER O-f 100.00 X4628 {)s:;.BA 100. a FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL CITY BANK CLEVELAND, OHIO No.H CONSOLIDATED COMMERCIAL ACCOUNT 194720 56-389 ""'"'412 100.00 00194720 , ' , ' ,.. ' OI\lJ;HUI\JDR ED 8< OOt 1 OOil;****************~***:**************** US DOLLAR ALA~~A OIL AND GAS CONSERVATION COMMISSION :t3:)WE5T 7TH AVENUE SUITE 100 ANCHORAGE AK 99501 DATE 07/31/01 I I NOT VALID AFTER 120 DAYS \2 n,.,..o-""'""",,," , '., I ',," ,"" Ii: ~"V'.' ~ "f" "" A;",,' """,' (, "¡t., "" (.. ~ (} J Y ~ ~~ \ "... ".'~" III . g ... 7 2 0 III I: 0'" . 2 0 :1 B g 5 I: 0 0 a ~... ¡. g III AMOUNT $lOO,O~1 -.ow ( ( TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETIER/P ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME lf5u Oy Zß 4 CHECK 1 STANDARD LETTER D EVELO PMENT DEVELOPMENT REDRIL/, EXPLORATION INJECTION WELL INJECTION WELL RED RILL CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) PILOT HOLE (PH) ANNULAR D}SP. OSAL ltL)NO ANNULAR DISPOSAL L-> YES ANNULAR DISPOSAL THIS WELL "CLUE" The permit is for a new wellbore segment of existing well . Permit No, API No. . . Production should continue to be reported as a function of the original API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). Annular disposal has not been requested. . . Annular Disposal of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved. . . , DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . . ANNULUS L-> YES + SPACING EXCEPTION Templates are located m drive\jody\templates Enclosed is the approved application for permit to drill the above referenced well. The permit is approved, subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. WELL PERMIT CHECKLIST FIELD & POOL ADMINISTRA TION WELL NAME 05"- zg 4 PROGRAM: exp 7~/L- GEOLAREA . - 1. Permit fee attached. .. . . . . . . . . .. . . . . . . . . . . N 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . N 3. Unique well name and number. .. . . . . . . . . . . . . . . . N 4. Wellioeated in a defined pool.. . . . . . . . . . . . . . . . . N 5. Weilioeated proper distance from drilling unit boundary. . . . N 6. Weilioeated proper distance from other wells. . . . . . . N 7. Sufficient acreage available- in drilling unit.. . . . . . . . . . . N, 8. If deviated, is wellbóre plat included.. . . . . . . . . . . . . . N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . N 10. Operator has appropriate bond in force. . . . . . . . . . N 11. Permit ean be issued without conservation order. . . . . . . . N ~~ DATE. ( 12. Permit ea~'be issued without administrativ~ approval.. . . . . NN &j. Zq',D 13. Can penT"t be approved before 15-day walt.. . . . . . . . . . ENGINEERING ~ i: ~~~~;~~~::E~,:~'~~~~~~ i ~U~'~g': ': : ': : ~ ? ~~ ~~ ~~ "~ ~ \, 17. CMT vol adequate to.tie-in long string to surf csg. . . . . . . . Y N ~ 18. GMT will cover all known productive horizons. . . . . -. . . . . ~ N 19. Casing designs adequate for C. T. B & permafrost. . . . . . . ~N \. l' ... \ ' 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N "~~~I¡,....c ~~, ~~ ~~(!-~ ~~ 21. If a re-drill. has a 1 D-403 for abandonment been approved. . . N ,.=>.) \ .~ \ -,..(\.. ,Î"\.. 22. Ad~qUatew. ell~resepa~tionpropose~.. . . . . . . . . . . . N~. c\ac~R <::\~t(~(""\c:R~~~\.~C.J 23. If dlverter requIred, does It meet regulations. . . . . . . . . . . Y N-N ~ \" 24. Drilling ,fluid program schematic & equip list adequate. . ~ . . N . 25. BOPEs. do they meet regulation. . . . . . . . . ":",^,.~ . . . N . \ r'\ ""I L,u' 'n~ ""' \ <:::'\ ~ 0 \ ..1..- - \ . 26. BOPE press rating appropriate; test to s~ psig. N \-\~~ '< ~ ,""\-~ o(\'Y \'<~'. 1\~,....J\~ ~~~\"è'\~\o' ~~ 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N . ~g: ~~~:~~~~h;~~~~:~:~f;~~U~d~~n::::::::::: ~~~ù~~~W~~\~~~~\ ~\~~~'r-~~~\\Jf~~~~~n~. ' 30. Permit can be issued wlo hydrogen sulfide measures. . . '0' y'Qr.? llot?CL~ J<ún,/; ~£2c:)k :D:3 oS- ~dvc:L~ '&,-?c) ~C>t'K-h 5 31. Data presented on potential overpressure zones. . . . . . . Y......-t( #~ S ,. . v 32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . .~.. A~ N A~ DATI; 33. Seabed condition survey (if off-shore). . . . . . . . . . . . Y N 1,23,.6/ 34. Contact name/phone for weekly progress reports [expla Dry only] Y N ANNULAR DlSPOSAL35. With proper cementing records. this plan . (A) will contain waste in a suitable receiving zone; . . . . . . . (B) will not contaminate freshwater; or cause drilling waste. .. to surtace; 0 0 (C) will not impair mechanical integrity of the well used for disposal; Y N (0) will not damage producing formation or impair recovery from a Y N pool; and E will not circumvent 20 AAC 25.252 or 20 MG 25.412. Y N ' GEOLOGY: ENGINEERING: 0 0 UIC/Annular COMMISSION: W~ .8~s lCi " JM COMP ANY INIT CLASS ~ dev L redrll ¡ serv wellbore seg _ann. disposal para req- UNIT# tJ//65Z::; ON/OFF SHORE ().n. c 0 Z 0 -I :E ::0 ( - -I m - Z -I oJ: GEOLOGY - APPR DATE Y N Y N en )- ::0 m » I \ / ./ '-........ -_.../ --------- ~þ~ Com m ents!1 ns tructi ons: c:\msoffice\wordian\diana\checklist (rev. 11/01/100) ( ;~' Well History File APPENDIX " Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. , To improve the readability of the Well History file and to simplify finding information. information- of this nature is accumulated at the end of the file under APPEN,DIX. No special' effort has been made to chronologically , . organize this category of information. (( \, { aD )-1 Cj5 !ulatJ **** REEL HEADER **** MWD 02/03/20 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 02/03/20 216746 01 1.75" NaviGamma - Gamma Ray *** LIS COMMENT RECORD *** ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Remark File Version 1.000 Extract File: ldwg.las -Version Information VERSo WRAP. -Well Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 10356.0000: STOP.FT 12235.0000: STEP.FT 0.5000: NULL. -999.2500: COMPo COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API. API NYUMBER: -Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 32 TOWN.N llN RANG. 15E PDAT. MSL EPD . F 0 LMF . RKB FAPD.F 70 DMF KB EKB .F 70 EDF .F N/A EGL .F N/A CASE.F N/A OSl . DIRECTIONAL -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All Gamma Ray data (GRAX) presented is realtime data, unless otherwise noted. (4) Section from 10580' MD (8624' SSTVD) to 10663' MD (8683' SSTVD) was logged during a MAD pass due to gamma problems. ROPS were lost for this section. (5) Well 05-28A was kicked off @ 11490' MD (8739' SSTVD) from the wellbore of Well 05-28APB1. (6) Well 05-28A was drilled to TD at 12235' MD (8721' SSTVD). (7) The interval from 12218' MD (8721' SSTVD) to 12235' MD (8721' SSTVD) 1.20: NO: CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ------------------------------- Starting Depth Ending Depth Level Spacing Absent Value BP Exploration, Inc. 05-28A Prudhoe Bay Unit 5032.87' FEL, 2034.62' FEL North Slope Alaska Baker Hughes INTEQ 1.75" NaviGamma - Gamma Ray 27-0ct-Ol 500292220801 Description ------------------------------- Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 ( (I was not logged due to sensor to bit offset. The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) curve supplied by BPX (SWS, 28-0ct-01) . A Magnetic Declination correction of 26.75 degrees has been applied to the Directional Surveys. (8) (9 ) MNEMONICS: GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units) ROPS -> Rate of Penetration, feet/hour TVD -> Subsea True Vertical Depth, feet SENSOR OFFSETS: RUN GAMMA DIRECTIONAL 1 19.00 ft. 24.00 ft. 2 19.08 ft. 24.08 ft. 3 19.33 it. 24.33 ft. 4 14.88 ft. 29.88 ft. 5 14.88 ft. 19.88 ft. 6 14.88 ft. 19.88 ft. 7 14.88 ft. 19.88 it. 8 19.34 ft. 24.34 ft. 9 19.53 ft. 24.53 ft. 10 19.24 ft. 24.24 ft. 11 19.43 ft. 24.43 ft. CURVE SHIFT DATA BASELINE, MEASURED, 10371.4, 10372.8, 10373.8, 10376.7, 10489.8,10489.8, 10510.6, 10509.8, 10534.0,10532.0, 10555.6,10549.6, 10624.1,10620.7, 10665.1,10661.3, 10687.9,10686.3, 10711.0, 10709.3, 10743.9,10741.7, 10810.0, 10808.6, 10829.8, 10827.2, 10941.4,10940.6, 10988.8,10987.2, 11047.6, 11047.2, 11180.9, 11178.8, 11474.4, 11472.8, 11626.8, 11626.6, 11652.3, 11650.2, 11678.7, 11676.3, 11698.4, 11697.6, 11733.3, 11732.3, 11735.7, 11735.9, 11739.9, 11739.9, 11744.2, 11742.4, 11924.1, 11923.7, 11962.8, 11959.9, 119":'1.2, 11970.1, 11976.0, 11975.4, 11991.0, 11991.6, 12055.8, 12058.2, 12127.7,12131.0, 12149.6,12153.3, EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subtile: 1 DISPLACEMENT 1. 41406 2.82812 0 -0.807617 -2.02051 -6.06055 -3.43359 -3.83887 -1.61621 -1.61621 -2.22168 -1.41406 -2.62598 -0.808594 -1.61621 -0.404297 -2.01953 -1.61621 -0.202148 -2.02051 -2.42383 -0.807617 -1.00977 0.202148 0 -1.81836 -0.40332 -2.82812 -1.01074 -0.606445 0.605469 2.42383 3.23242 3.63672 118 records... ( ( ( Minimum record length: Maximum record length: 8 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ---------------------------- WDFN LCC CN WN FN COUN STAT mwd.xtf 150 BP Exploration, Inc. 05-28A Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by BPX 3. The PDC used is a Schlumberger Gamma Ray dated 28-0ct-01. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ----------- ------------------------------------------ GR ROP GR ROP GRAX10 ROPS10 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: One depth per frame (value= 0) Datum Specification Block Sub-type is: 84 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 2 GR ROP MWD MWD 68 68 1 1 API F/HR 4 4 4 4 ------- 8 Total Data Records: 45 Tape File Start Depth = 10356.000000 Tape F~le End Depth = 12235.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet (' l , **** FILE TRAILER **** Tape Subfile: 2 54 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MN"EM VALU ---------------------------- WDFN LCC CN WN FN COUN STAT mwd.xtf 150 BP Exploration, Inc. 05-28A Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is the unedited field raw data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GRAX ROPS GRAX ROPS GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing:. 0.500000 Frame spacing units: [F ] Number of frames per record is: One depth per frame (value= 0) Datum Specification Block Sub-type is: 84 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 2 GRAX ROPS MWD MWD 68 68 1 1 API F/HR 4 4 4 4 ------- 8 Total Data Records: 45 Tape Fjle Start Depth = 10356.000000 { (' . Tape File End Depth = 12235.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 54 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** TAPE TRAILER **** MWD 02/03/20 216746 01 **** REEL TRAILER **** MWD 02/03/20 BHI 01 Tape Subtile: 4 2 records... Minimum record length: Maximum record length: 13 2 bytes 132 bytes Tape Subtile 1 is type: LIS Tape Subtile 2 is type: LIS DEPTH GR ROP 10356.0000 -999.2500 -999.2500 10356.5000 15.9201 -999.2500 10400.0000 -999.2500 -999.2500 10500.0000 17.8100 32.6780 10600.0000 32.4211 -999.2500 10700.0000 72.6751 33.9595 10800.0000 29.1263 86.3260 10900.0000 98.4579 74.8259 11000.0000 62.2636 53.3806 11100.0000 74.8093 35.2078 11200.0000 109.7191 58.8265 11300.0000 38.4847 112.7698 11400.0000 35.8099 89.4541 11500.0000 67.0088 27.0454 11600.0000 28.5474 39.8795 11700.0000 87.3265 50.9419 11800.0000 97.1418 49.6440 11900.0000 136.3286 62.8609 12000.0000 60.0575 11.4568 12100.0000 133.5036 15.3374 12200.0000 92.0297 32.6435 12235.0000 -999.2500 -999.2500 Tape File Start Depth = 10356.000000 Tape File End Depth 12235.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subtile 3 is type: LIS DEPTH GRAX ROPS -. (, (' 10356.0000 15.5510 -999.2500 10356.5000 15.9710 -999.2500 10400.0000 -999.2500 -999.2500 10500.0000 17.8100 34.0910 10600.0000 35.4900 -999.2500 10700.0000 86.2830 27.1030 10800.0000 29.0210 134.8750 10900.0000 91. 9390 76.7250 11000.0000 62.5660 68.3550 11100.0000 68.6520 8.9600 11200.0000 109.3900 69.8500 11300.0000 38.4290 112.3580 11400.0000 38.8490 80.1870 11500.0000 71.6600 109.9790 11600.0000 30.0330 38.4320 11 700.0000 70.2930 84.0670 11800.0000 103.7030 24.4990 11900.0000 116.2880 63.7770 12000.0000 70.9000 12.9290 12100.0000 127.6790 29.5430 12200.0000 92.1600 29.6410 12235.0000 -999.2500 7.9910 Tape File Start Depth = 10356.000000 Tape File End Depth = 12235.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 4 is type: LIS