HomeMy WebLinkAbout201-224• •
gyro ata
Gyrodata Incorporated
1682 W. Sam Houston Pkwy. N
Houston, Texas 77043
7131461-3146
Fax: 713(461-0920
September 15, 2005
Ms. Sharmaine Copeland
BP Exploration (Alaska), Inc.
900 E. Benson Blvd.
Petrotechnical Data Center, LR2-1
Anchorage, Alaska 99508
~~'{~ ,IAN 2 5 200
Re: J-Pad, Well #yl-17B
Prudhoe Bay, Alaska
., ~~-~I'
~ ~~~~
~/
Enclosed, please find one (1) original, two (2) copies, and two (2) disks ofi the
completed survey for the above referenced welt.
iNe would like to take this opportunity to thank you for using Gyrodata, and we
look forward to serving you in the future.
Sincerely,
//~~
Rob Shoup
North American Operations Manager
RS:tf
Serving the Worldwide Energy Industry with Precision Survey Instrumentation
• •
gyro ata
Gyrodata Incorporated
1682 W. Sam Houston Pkwy. N
Houston, Texas 77043
713/461-3146
Fax: 7i 314 6 1-092 0
SURVEY REPORT
BP
J-PAD #J-176
MAST TRUCK
PRUDHOE BAY, AK
AK0805G_560
SEPTEMBER 1, 2005
c~ ~~
Serving the Worldwide Energy {ndustry with Precision Survey Instrumentation
~i ~ i -.~~
A Gyrodata Directional Survey
for
B.P. EXPLORATION ALASKA
Location: MAST UNIT, ,Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
Run Date: 9/01/2005 12:41:21 PM
Surveyor: Robert Williams
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.326920 deg. N Longitude: 148.843420. deg. W
Sub-sea Correction from Vertical Reference: 77.00 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Well Head Location
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet deg. feet
25 ft.
•
0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.00 N 0.00 E
--------------------------------------------------------------------------------------
Rate-Gyroscopic continuous survey run in 5 1/2" tubing
Measured depths are referenced to the original RKB at 77' AMSL and 39.78' above the base flange
--------------------------------------------------------------------------------------
100.00 0.35 271.74 0.09 100.00 0.3 271.7 0.01 N 0.31 W
200.00 0.38 257.90 0.02 200.00 0.9 266.9 0.05 S 0.94W
300.00 0.55 258.91 0.04 299.99 1.7 263.0 0.21 S 1.74W
400.00 0.63 240.42 0.05 399.99 2.8 257.9 0.58 S 2.69W
500.00 0.58 214.97 0.07 499.98 3.7 249.9 1.26 S 3.46W
600.00 0.39 196.77 0.06 599.98 4.3 242.5 2.01 S 3.85W
700.00 0.50 157.55 0.08 699.98 4.7 234.1 2.73 S 3.78W
800.00 0.62 129.10 0.08 799.97 4.7 222.6 3.47 S 3.19W
900.00 0.78 114.50 0.06 899.96 4.6 207.7 4.10 S 2.15W
1000.00 0.82 103.71 0.04 999.96 4.6 190.4 4.55 S 0.84W
1100.00 0.90 103.09 0.02 1099.94 4.9 172.8 4.90 S 0.61 E
1200.00 0.55 100.45 0.09 1199.94 5.5 160.3 5.16 S 1.85 E
1300.00 0.40 89.85 0.04 1299.93 5.9 153.1 5.25 S 2.67 E
1400.00 0.24 102.96 0.04 1399.93 6.2 148.7 5.29 S 3.22 E
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
1500.00 0.48 324.12 0.17 1499.93 5.9 147.6 5.00 S 3.17 E
1600.00 0.91 344.76 0.12 1599.92 4.8 145.1 3.90 S 2.72 E
1700.00 0.46 346.47 0.11 1699.92 3.7 138.6 2.74 S 2.42 E
1800.00 0.20 285.35 0.10 1799.91 3.2 137.0 2.31 S 2.15 E
1900.00 0.10 325.98 0.04 1899.91 2.9 138.6 2.19 S 1.93 E
2000.00 0.33 41.49 0.08 1999.91 2.8 132.4 1.90 S 2.07 E
2100.00 0.18 158.99 0.11 2099.91 3.0 128.2 1.83 S 2.32 E
2200.00 0.26 155.84 0.02 2199.91 3.3 131.5 2.19 S 2.47 E
2300.00 0.35 149.96 0.02 2299.91 3.8 134.4 2.66 S 2.72 E
2400.00 0.61 141.76 0.07 2399.91 4.6 136.2 3.35 S 3.21 E
2500.00 0.37 135.90 0.06 2499..90 5.5 136.7 4.00 S 3.76 E
2600.00 0.28 139.62 0.02 2599.90 6.1 136.8 4.42 S 4.14 E
2700.00 0.53 108.28 0.08 2699.90 6.7 135.0 4.74 S 4.74 E
2800.00 6.00 85.98 1.38 2799.70. 11.3 1 i3.5 4.52 S 10.40 E
2900.00 8.09 84.62 0.52 2898.94 22.9 98.8 3.50 S 22.62 E
3000.00 9.67 85.60 0.40 2997.74 38.1 93.3 2.19 S 38.01 E
3100.00 10.73 86.97 0.27 3096.15 55.7 91.1 1.06 S 55.68 E
3200.00 13.23 88.38 0.63 3193.97 76.4 90.2 0.24 S 76.41 E
•
•
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
3220.00 14.63 87.55 1.77 3213.38 81.2 90.0 0.07 S 81.22 E
3240.00 15.36 87.19 0.93 3232.70 86.4 89.9 0.17 N 86.39 E
3260.00 16.21 87.39 1.06 3251.95 91.8 89.7 0.43 N 91.82 E
3280.00 16.66 87.19 0.57 3271.13 97.5 89.6 0.70 N 97.47 E
3300.00 17.26 87.47 0.75 3290.26 103.3 89.5 0.97 N 103.30 E
3320.00 17.59 87.53 0.41 3309.34 109.3 89.4 1.23 N 109.29 E
3340.00 18.18 87.39 0.74 3328.38 115.4 89.3 1.50 N 115.42 E
3360.00 18.60 87.54 0.53 3347.35 121.7 89.2 1.78 N 121.72 E
3380.00 19.27 87.42 0.84 3366.27 128.2 89.1 2.07 N 128.21 E
3400.00 19.74 87.17 0.61 3385.12 134.9 89.0 2.38 N 134.88 E
3420.00 20.53 87.23 0.98 3403.90 141.8 88.9 2.72 N 141.75 E
3440.00 20.97 87.18 0.56 3422.60 148.9 88.8 3.06 N 148.83 E
3460.00 21.53 87.50 0.71 3441.24 156.1 88.8 3.40 N 156.07 E
3480.00 21.97 87.48 0.56 3459.82 163.5 88.7 3.73 N 163.48 E
3500.00 22.57 87.80 0.76 3478.33 171.1 88.6 4.04 N 171.05 E
3520.00 23.04 88.23 0.62 3496.76 178.8 88.6 4.31 N 178.80 E
3540.00 23.37 88.12 0.42 3515.15 186.7 88.6 4.56 N 186.67 E
3560.00 23.85 88.59 0.64 3533.47 194.7 88.6 4.79 N 194.68 E
•
•
A Gyrodata Directional Survey -
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK080SG 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
3580.00 24.24 88.76 0.49 3SS1.74 202.9 88.6 4.97N 202.82 E
3600.00 24.65 88.89 O.S3 3569.95 211.2 88.6 5.14 N 211.10 E
3620.00 24.93 88.84 0.35 3588.10 219.5 88.6 5.31 N 219.48 E
3640.00 25.42 89.04 0.62 3606.20 228.1 88.6 5.47 N 227.99 E
3660.00 25.84 89.40 0.56 3624.23 236.7 88.6 5.58 N 236.64 E
3680.00 26.SS 89.52 0.89 3642.18 245.5 88.7 5.67 N 245.47 E
3700.00 26.90 89.65 0.45 3660.04 254.5 88.7 5.73 N 254.46 E
3720.00 27.54 89.63 0.80 3677.83 263.7 88.7 5.79 N 263.61 E
3740.00 28.17 89.73 0.78 3695.51 273.0 88.8 5.84 N 272.96 E
3760.00 29.02 89.88 1.07 3713.07 282.6 88.8 5.87 N 282.53 E
3780.00 29.81 90.51 1.OS 3730.49 292.4 88.9 5.84 N 292.35 E
3800.00 30.57 90.80 0.97. 3747.78 302.5 88.9 5.72 N 302.41 E
3820.00 30.93 91.06 0.49 3764.97 312.7 89.0 5.56 N 312.63 E
3840.00 31.32 91.21 0.50 3782.09 323.0 89.1 5.35 N 322.97 E
3860.00 31.85 91.50 0.68 3799.13 333.5 89.1 5.10 N 333.44 E
3880.00 32.35 91.81 0.66 3816.07 344.1 89.2 4.80N 344.06 E
3900.00 32.92 92.55 0.87 3832.91 354.9 89.3 4.39 N 354.84 E
3920.00 33.33 93.00 0.60 3849.66 365.8 89.4 3.86N 365.76 E
3940.00 33.75 94.04 0.89 3866.33 376.8 89.5 3.18 N 376.79 E
•
r~
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
3960.00 34.13 94.66 0.64 3882.92 387.9 89.7 2.33 N 387.92 E
3980.00 34.53 95.98 1.05 3899.44 399.2 89.8 1.29 N 399.15 E
4000.00 35.02 96.54 0.74 3915.87 410.5 90.0 0.04N 410.49 E
4020.00 35.71 97.19 0.97 3932.18 422.0 90.2 1.34 S 421.98 E
4040.00 36.20 97.46 0.65 3948.37 433.6 90.4 2.84 S 433.63 E
4060.00 37.11 98.33 1.31 3964.41 445.5 90.6 4.48 S 445.45 E
4080.00 37.99 98.36 1.09 3980.27 457.6 90.8 6.25 S 457.51 E
4100.00 39.55 98.12 1.96 3995.86 470.0 91.0 8.04 S 469.91 E
4120.00 40.47 97.99 1.15 4011.18 482.7 91.2 9.84 S 482.64 E
4140.00 41.51 97.81 1.32 4026.28 495.8 91..3 11.65 S 495.63 E
4160.00 42.28 97.89 0.96 4041.16 509.0 91.5 13.47 S 508.86 E
4180.00 43.06 98.64 1.17 4055.87 522.5 91.7 15.42 S 522.28 E
4200.00 43.87 99.91 1.49 4070.38 536.1 91.9 17.64 S 535.86 E
4220.00 44.24 100.54 0.71 4084.76 549.9 92.1 20.11 S 549.54 E
4240.00 44.64 100.76 0.54 4099.04 563.8 92.3 22.70 S 563.31 E
4260.00 45.00 100.78 0.45 4113.22 577.7 92.5 25.33 S 577.15 E
4280.00 45.31 100.85 0.40 4127.33 591.7 92.7 27.99 S 591.08 E
4300.00 45.34 101.03 0.16 4141.39 605.8 92.9 30.69 S 605.05 E
•
•
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMLJTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
4320.00 45.28 101.27 0.22 4155.45 619.9 93.1 33.44 S 619.00 E
4340.00 45.09 101.46 0.29 4169.55 633.9 .93.3 36.24 S 632.91 E
4360.00 44.82 101.71 0.41 4183.70 647.9 93.5 39.07 S 646.75 E
4380.00 44.82 101.94 0.20 4197.89 661.9 93.6 41.96 S 660.55 E
4400.00 44.78 102.08 0.14 4212.08 675.8 93.8 44.89 S 674.33 E
4420.00 44.78 102.25 0.15 4226.28 689.8 94.0 47.86 S 688.10 E
4440.00 44.53 102.60 0.43 4240.50 703.7 94.1 50.89 S 701.83 E
4460.00 44.62 102.79 0.21 4254.75 717.6 94.3 53.97 S 715.53 E
4480.00 44.34 103.04 0.42 4269.02 731.4 94.5 57.10 S 729.19 E
4500.00 44.38 103.13 0.10 4283.32 745.2 94.6 60.27 S 742.81 E
4520.00 44.39 103.29 0.14 4297.61 759.1 94.8 63.47 S 756.43 E
4540.00 44.46 103.24 0.09 4311.89 772.9 94.9 66.68 S 770.05 E
4560.00 44.44 103.27 0.04 4326.17 786.8 95.1 69.89 S 783.68 E
4580.00 44.51 103.30 0.10 4340.44 800.7 95.2 73.11 S 797.32 E
4600.00 44.46 103.21 0.10 4354.71 814.5 95.4 76.32 S 810.96 E
4620.00 44.46 103.21 0.01 4368.99 828.4 95.5 79.53 S 824.60 E
4640.00 44.40 103.26 0.09 4383.27 842.3 95.6 82.73 S 838.23 E
4660.00 44.41 103.18 0.07 4397.56 856.2 95.8 85.93 S 851.85 E
•
C7
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH. DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
4680.00 44.45 103.20 0.04 4411.84 870.1 95.9 89.13 S 865.48 E
4700.00 44.52 103.24 0.09 4426.11 884.0 96.0 92.33 S 879.13 E
4720.00 44.70 103.24 0.23 4440.35 897.9 96.1 95.55 S 892.80 E
4740.00 44.47 103.44 0.34 4454.59 911.8 96.2 98.78 S 906.46 E
4760.00 44.48 103.70 0.23 4468.86 925.7 96.3 102.07 S 920.08 E
4780.00 44.46 103.96 0.23 4483.13 939.6 96.4 105.42 S 933.68 E
4800.00 44.50 104.20 0.21 4497.40 953.5 96.6 108.83 S 947.28 E
4820.00 44.55 104.30 0.10 4511.66 967.4 96.7 112.28 S 960.87 E
4840.00 44.63 104.28 0.10 4525.91 981.3 96.8 115.75 S 974.47 E
4860.00 44.55 104.25 0.10 4540.15 995.2 96.9 119.21 S 988.08 E
4880.00 44.65 104.27 0.14 4554.39 1009.2 97.0 122.67 S 1001.69 E
4900.00 44.68 104.14 0.12 4568.61 1023.1 97.1 126.12 S 1015.32 E
4920.00 44.72 104.10 0.06 4582.83 1037.1 97.2 129.55 S 1028.96 E
4940.00 44.73 104.19 0.08 4597.04 1051.1 97.3 132.99 S 1042.61 E
4960.00 44.69 104.22 0.06 4611.25 1065.0 97.4 136.44 S 1056.25 E
4980.00 44.58 104.51 0.28 4625.49 1079.0 97.5 139.93 S 1069.86 E
5000.00 44.46 104.38 0.19 4639.75 1092.9 97.5 143.42 S 1083.44 E
5020.00 44.31 104.25 0.21 4654.04 1106.8 97.6 146.88 S 1097.00 E
5040.00 44.22 104.37 0.15 4668.36 1120.7 97.7 150.33 S 1110.53 E
C,
•
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0845G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
5060.00 44.23 104.40 0.03 4682.69 1134.5 97.8 153.80 S 1124.04 E
5080.00 44.05 104.21 0.28 4697.04 1148.4 97.9 157.24 S 1137.54 E
5100.00 43.76 104.25 0.36 4711.45 1162.1 97.9 160.65 S 1150.98 E
5120.00 43.92 104.18 0.21 4725.88 1175.9 98.0 164.05 S 1164.41 E
5140.00 43.86 104.18 0.08 4740.29 1189.7 98.1 167.45 S 1177.85 E
5160.00 43.92 104.27 0.11 4754.71 1203.5 98.2 170.85 S 1191.29 E
5180.00 43.86 104.49 0.20 4769.12 1217.3 98.2 174.30 S 1204.72 E
5200.00 43.99 104.47 0.16 4783.52 1231.1 98.3 177.77 S 1218.16 E
5220.00 43.77 104.57 0.29 4797.94 1244.8 98.4 181.24 S 1231.58 E
5240.00 43.71 104.77 0.19 4812.39 1258.6 98.4 184.75 S 1244.96 E
5260.00 43.74 104..78 0.04 4826.84 1272.3 98.5 188.27 S 1258.32 E
5280.00 43.85 104.77 0.14 4841.28 1286.1 98.6 191.80 S 1271.70 E
5300.00 43.97 104.75 0.15 4855.69 1299.9 98.6 195.34 S 1285.12 E
5320.00 44.16 104.73 0.24 4870.06 1313.7 98.7 198.88 S 1298.57 E
5340.00 44.40 104.86 0.32 4884.38 1327.6 98.8 202.44 S 1312.07 E
5360.00 44.45 104.89 0.06 4898.66 1341.5 98.8 206.04 S 1325.60 E
5380.00 44.56 105.05 0.20 4912.93 1355.5 98.9 209.66 S 1339.14 E
5400.00 44.52 105.22 0.16 4927.18 1369.4 99.0 213.32 S 1352.69 E
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
5420.00 44.55 105.37 0.14 4941.44 1383.3 99.0 217.02 S 1366.21 E
5440.00 44.34 105.42 0.26 4955.72 1397.3 99.1 220.74 S 1379.72 E
5460.00 44.32 105.47 0.04 4970.02 1411.2 99.2 224.46 S 1393.19 E
5480.00 44.35 105.43 0.04 4984.33 1425.0 99.2 228.18 S 1406.66 E
5500.00 44.57 105.62 0.32 4998.60 1439.0 99.3 231.93 S 1420.16 E
5520.00 44.56 105.52 0.09 5012.85 1452.9 99.3 235.70 S 1433.68 E
5540.00 44.59 105.50 0.03 5027.10 1466.9 99.4 239.45 S 1447.20 E
5560.00 44.61 105.39 0.10 5041.34 1480.8 99.5 243.19 S 1460.74 E
5580.00 44.87 105.42 0.32 5055.55 1494.8 99.5 246.93 S 1474.31 E
5600.00 45.03 105.62 0.27 5069.70 1508.9 99.6 250.71 S 1487.92 E
5620.00 45.18 105.76 0.22 5083.82 1523.0 99.6 254.54 S 1501.56 E
5640.00 45.26 106.00 0.24 5097.90 1537.1 99.7 258.43 S 1515.22 E
5660.00 45.26 106.24 0.21 5111.98 1551.2 99.7 262.37 S 1528.87 E
5680.00 45.28 106.78 0.48 S 126.06 1565.3 99.8 266.41 S 1542.49 E
5700.00 45.25 107.01 0.21 5140.13 1579.4 99.9 270.54 S 1556.08 E
5720.00 45.37 107.17 0.21 5154.20 1593.5 99.9 274.72 S 1569.67 E
5740.00 45.36 107.37 0.18 5168.25 1607.6 100.0 278.94 S 1583.27 E
5760.00 45.44 107.48 0.14 5182.29 1621.8 100.1 283.20 S 1596.85 E
~~
~.
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
5780.00 45.38 107.50 0.08 5196.33 1635.9 100.1 287.48 S 1610.44 E
5800.00 45.54 107.62 0.22 5210.36 1650.0 100.2 291.78 S 1624.03 E
5820.00 45.49 107.56 0.07 5224.38 1664.2 100.2 296.10 S 1637.63 E
5840.00 45.61 107.69 0.18 5238.38 1678.3 100.3 300.42 S 1651.24 E
5860.00 45.34 108.05 0.46 5252.41 1692.5 100.4 304.80 S 1664.81 E
5880.00 45.44 108.22 0.19 5266.45 1706.6 100.4 309.23 S 1678.34 E
5900.00 45.37 108.52 0.28 5280.49 1720.7 100.5 313.72 S 1691.85 E
5920.00 45.40 108.72 0.18 5294.54 1734.8 100.6 318.26 S 1705.34 E
5940.00 45.12 109.03 0.44 5308.62 1748.8 100.6 322.86 S 1718.79 E
5960.00 45.15 109.36 0.29 5322.73 1762.9 100.7 327.52 S 1732.17 E
5980.00 44.97 109.57 0.29 5336.86 1776.9 100.8 332.24 S 1745.52 E
6000.00 44.93 109.86 0.26 5351.01 1790.8 100.8 337.00 S 1758.82 E
6020.00 44.64 109.93 0.37 5365.20 1804.7 100.9 341.80 S 1772.07 E
6040.00 44.88 110.00 0.31 5379.41 1818.6 101.0 346.61 S 1785.31 E
6060.00 45.00 110.03 0.15 5393.56 1832.6 101.1 351.44 S 1798.58 E
6080.00 45.26 110.07 0.33 5407.67 1846.6 101.1 356.30 S 1811.90 E
6100.00 45.23 110.25 0.16 5421.75 1860.6 101.2 361.20 S 1825.23 E
6120.00 45.38 110.30 0.19 5435.82 1874.7 101.3 366.12 S 1838.57 E
6140.00 45.40 110.46 0.15 5449.87 1888.7 101.3 371.08 S 1851.91 E
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
6160.00 45.44 110.32 0.14 5463.90 1902.8 101.4 376.05 S 1865.27 E
6180.00 45.30 110.44 0.21 5477.95 1916.9 101.5 381.00 S 1878.61 E
6200.00 45.20 110.46 0.13 5492.04 1930.9 101.5 385.96 S 1891.92 E
6220.00 45.07 110.69 0.26 5506.14 1944.9 101.6 390.95 S 1905.19 E
6240.00 45.10 110.43 0.24 5520.26 1958.9 101.7 395.92 S 1918.45 E
6260.00 45.16 110.31 0.12 5534.37 1972.9 101.7 400.86 S 1931.74 E
6280.00 45.29 110.38 0.17 5548.46 1986.9 101.8 405.79 S 1945.05 E
6300.00 45.46 110.42 0.22 5562.51 2001.0 101.8 410.75 S 1958.39 E
6320.00 45.45 110.38 0.04 5576.54 2015.1 101.9 415.72 S 1971.75 E
6340.00 45.33 110.36 0.15 5590.58 2029.2 102.0 420.68 S 1985.10 E
6360.00 45.16 110.43 0.22' 5604.66 2043.2 102.0 425.63 S 1998.41 E
6380.00 45.01 110.60 0.25 5618.79 2057.2 102.1 430.59 S 2011.68 E
6400.00 44.99 110.56 0.04 5632.93 2071.2 102.1 435.57 S 2024.92 E
6420.00 45.27 110.54 0.34 5647.04 2085.3 102.2 440.54 S 2038.19 E
6440.00 45.45 110.58 0.23 5661.09 2099.3 102.3 445.54 S 2051.51 E
6460.00 45.74 110.69 0.37 5675.09 2113.5 102.3 450.57 S 2064.88 E
6480.00 45.66 110.67 0.10 5689.06 2127.6 102.4 455.63 S 2078.27 E
6500.00 45.39 110.60 0.34 5703.07. 2141.8 102.4 460.66 S 2091.63 E
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
6520.00 45.42 110.52 0.08 5717.11 2155.9 102.5 465.66 S 2104.96 E
6540.00 45.70 110.68 0.38 5731.11 2170.0 102.5 470.68 S 2118.33 E
6560.00 45.89 110.66 0.24 5745.06 2184.2 102.6 475.74 S 2131.74 E
6580.00 45.92 110.63 0.05 5758.98 2198.4 102.6 480.81 S 2145.18 E
6600.00 45.80 110.65 0.15 5772.90 2212.6 102.7 485.87 S 2158.62 E
6620.00 45.95 110.75 0.21 5786.83 2226.8 102.7 490.94 S 2172.05 E
6640.00 45.85 110.71 0.13 5800.75 2241.1 102.8 496.03 S 2185.48 E
6660.00 45.80 110.64 0.09. 5814.6$ 2255.3 102.8 501.09 S 2198.90 E
6680.00 45.65 110.71 0.19 5828.65 2269.5 102.9 506.15 S 2212.30 E
6700.00 45.64 110.82 0.10 5842.63 2283.6 102.9 511.22 S 2225.67 E
6720.00 45.54 110.89 0.14 5856.62 2297.8 103.0 516.30 S 2239.02 E
6740.00 45.49 111.12 0.21 5870.64 2311.9 103.0 521.42 S 2252.34 E
6760.00 45.26 111.13 0.28 5884.69 2326.0 103.1 526.55 S 2265.62 E
6780.00 45.35 111.22 0.13 5898.76 2340.1 103.1 531.68 S 2278.87 E
6800.00 45.12 111.22 0.29 5912.84 2354.1 103.2 536.82 S 2292.11 E
6820.00 45.24 111.14 0.17 5926.94 2368.2 103.2 541.95 S 2305.34 E
6840.00 45.03 111.02 0.29 5941.04 2382.2 103.3 547.05 S 2318.57 E
6860.00 45.11 110.98 0.10 5955.17 2396.3 103.3 552.12 S 2331.78 E
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
6880.00 45.05 110.94 0.08 5969.29 2410.3 103.4 557.19 S 2345.01 E
6900.00 45.19 110.85 0.20 5983.40 2424.3 103.4 562.24 S 2358.25 E
6920.00 45.03 110.99 0.24 5997.52 2438.4 103.5 567.30 S 2371.49 E
6940.00 44.94 110.88 0.15 6011.66 2452.4 103.5 572.35 S 2384.69 E
6960.00 44.86 110.80 0.12 6025.83 2466.4 103.5 577.38 S 2397.88 E
6980.00 44.75 110.75 0.14 6040.02 2480.4 103.6 582.38 S 2411.06 E
7000.00 44.63 110.79 0.16 6054.24 2494.4 103.6 587.36 S 2424.21 E
7020.00 44.45 110.73 0.23 6068.50 2508.3 103.7 592.34 S 2437.33 E
7040.00 44.58 110.65 0.18 6082.76 2522.2 103.7 597.29 S 2450.45 E
7060.00 44.44 110.88 0.27 6097.02 2536.1 103.7 602.26 S 2463.56 E
7080.00 44.36 110.78 0.13 6111.31 2550.0 103.8 607.24 S 2476.64 E
7100.00 44.09 110.67 0.35 6125.64 2563.8 103.8 612.17 S .2489.68 E
7120.00 44.20 110.79 0.17 6139.99 2577.7 103.9 617.11 S 2502.71 E
7140.00 44.06 110.91 0.21 6154.35 2591.5 103.9 622.06 S 2515.72 E
7160.00 44.40 110.90 0.43 6168.68 2605.3 103.9 627.04 S 2528.76 E
7180.00 44.06 110.84 0.42 6183.01 2619.2 104.0 632.01 S 2541.79 E
7200.00 43.54 110.73 0.67 6197.44 2632.9 104.0 636.92 S 2554.74 E
7220.00 43.76 110.66 0.28 6211.91 2646.6 104.0 641.80 S 2567.65 E
7240.00 43.61 110.80 0.22 6226.38 2660.4 104.1 646.69 S 2580.57 E
~.
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG. VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg.1 feet feet deg. feet
25 ft.
7260.00 43.60 110.97 0.15 6240.86 2674.1 104.1 651.61 S 2593.45 E
7280.00 43.40 111.10 0.27 6255.37 2687.7 104.1 656.55 S 2606.30 E
7300.00 43.49 111.26 0.17 6269.89 2701.4 104.2 661.52 S 2619.13 E
7320.00 43.32 111.26 0.22 6284.42 2715.0 104.2 666.50 S 2631.94 E
7340.00 42.93 110.97 0.54 6299.02. 2728.6 104.2 671.43 S 2644.69 E
7360.00 42.97 111.13 0.14 6313.66 2742.1 104.3 676.32 S 2657.41 E
7380.00 43.00 111.11 0.04 6328.29 2755.7 104.3 681.24 S 2670.13 E
7400.00 42.91 111.20 0.14 6342.92 2769.2 104.3 686.15 S 2682.84 E
7420.00 42.86 111.37 0.16 6357.58 2782.7 104.4 691.09 S 2695.52 E
7440.00 42.47 111.54 0.51 6372.29 2796.2 104.4 696.05 S 2708.14 E
7460.00 42.49 111.57 0.04 6387.04 2809.6 104.4 701.01 S 2720.70 E
7480.00 42.37 111.43 0.19 6401.80 2822.9 104.5 705.96 S 2733.25 E
7500.00 42.40 111.37 0.07 6416.57 2836.3 104.5 710.88 S 2745.80 E
7520.00 42.21 111.58 0.30 6431.36 2849.7 104.5 715.81 S 2758.33 E
7540.00 42.26 111.61 0.07 6446.17 2863.0 104.6 720.76 S 2770.83 E
7560.00 42.00 111.64 0.33 6461.00 2876.4 104.6 725.70 S 2783.31 E
7580.00 42.05 111.76 0.12 6475.86 2889.6 104.6 730.65 S 2795.75 E
7600.00 41.89 111.78 0.21 6490.73 2902.9 104.7 735.61 S 2808.17 E
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
7620.00 41.86 111.93 0.12 6505.62 2916.2 104.7 740.58 S 2820.56 E
7640.00 41.64 111.85 0.29 6520.54 2929.4 104.7 745.55 S 2832.92 E
7660.00 41.68 112.02 0.15 6535.48 2942.6 104.8 750.51 S 2845.25 E
7680.00 41.48 112.01 0.25 6550.44 2955.7 104.8 755.49 S 2857.55 E
7700.00 41.47 111.72 0.24 6565.43 2968.9 104.8 760.42 S 2869.84 E
7720.00 41.30 111.83 0.22 6580.43 2982.0 104.9 765.32 S 2882.12 E
7740.00 41.13 112.32 0.46 6595.48 2995.1 104.9 770.28 S 2894.34 E
7760.00 40.96 112.52 0.27 6610.56 3008.1 104.9 775.29 S 2906.48 E
7780.00 40.87 112.13 0.34 6625.68 3021.1 105.0 780.26 S 2918.59 E
7800.00 39.87 110.66 1.73 6640.91 3034.0 105.0 784.99 S 2930.65 E
7820.00 39.94 109.78 0.71 6656.26 3046.7 105.0 789.42 S 2942.69 E
7840.00 38.92 107.97 1.92 6671.70 3059.4 105.0 793.54 S 2954.71 E
7860.00 38.39 106.77 1.15 6687.32 3071.9 105..0 797.27 S 2966.63 E
7880.00 37.47 106.10 1.26 6703.10 3084.2 105.0 800.75 S 2978.42 E
7900.00 35.93 104.77 2.16 6719.13 3096.1 105.0 803.93 S 2989.94 E
7920.00 35.01 103.97 1.30 6735.42 3107.7 105.0 806.81 S 3001.18 E
7940.00 34.71 102.10 1.39 6751.83 3119.2 105.0 809.39 S 3012.32 E
7960.00 34.86 100.79 0.96 6768.26 3130.5 105.0 811.65 S 3023.50 E
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA.
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE. HORIZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
7980.00 34.57 101.30 0.52 6784.70 3141.9 105.0 813.83 S 3034.68 E
8000.00 34.81 100.85 0.44 6801.15 3153.3 105.0 816.02 S 3045.85 E
8020.00 34.77 100.62 0.18. 6817.57 3164.6 105.0 818.14 S 3057.06 E
8040.00 34.57 100.42 0.29 6834.02 3176.0 105.0 820.22 S 3068.25 E
8060.00 34.52 100.46 0.07 6850.50 3187.3 105.0 822.28 S 3079.40 E
8080.00 34.45 100.51 0.10 6866.98 3198.6 104.9 824.34 S 3090.53 E
8100.00 34.55 100.69 0.18 6883.46 3209.9 104.9 826.42 S 3101.67 E
8120.00 34.41 100.87 0.21 6899.95 3221.2 104.9 828.54 S 3112.79 E
8140.00 34.50 101.55 0.49 6916.44 3232.5 104.9 830.74 S 3123.89 E
8160.00 34.53 100.87 0.48 6932.92 3243.8 104.9 832.94 S 3135.00 E
8180.00 34.69 100.89 0.21 6949.38 3255.1 104.9 835.08 S 3146.16 E
8200.00 34.53 101.38 0.40 6965.84 3266.4 104.9 837.28 S 3157.31 E
8220.00 34.64 101.87 0.37 6982.31 3277.8 104.8 839.57 S 3168.43 E
8240.00 34.62 101.79 0.06 6998.76 3289.1 104.8 841.90 S 3179.55 E
8260.00 34.69 102.15 0.27 7015.22 3300.5 104.8 844.26 S 3190.68 E
8280.00 34.62 102.29 0.13 7031.67 3311.8 104.8 846.66 S 3201.79 E
8300.00 34.49 102.35 0.17 7048.14 3323.2 104.8 849.08 S 3212.87 E
8320.00 34.44 102.53 0.14 7064.63 3334.5 104.8 851.52 S 3223.93 E
8340.00 34.41 102.72 0.14 7081.13 3345.8 104.8 853.99 S 3234.96 E
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOS URE HORI ZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
8360.00 34.39 103.07 0.25 7097.63 3357.1 104.8 856.52 S 3245.97 E
8380.00 34.55 103.15 0.20 7114.12 3368.4 104.8 859.08 S 3257.00 E
8400.00 34.59 102.91 0.17 7130.58 3379.7 104.8 861.64 S 3268.06 E
8420.00 34.91 103.37 0.52 7147.02 3391.1 104.8 864.23 S 3279.16 E
8440.00 34.91 104.34 0.69 7163.42 3402.6 104.8 866.98 S 3290.27 E
8460.00 35.00 104.32 0.11 7179.81 3414.0 104.8 869.81 S 3301.37 E
8480.00 35.31 104.94 0.59 7196.16 3425.5 104.8 872.72 S 3312.51 E
8500.00 35.56 105.27 0.40 7212.46 3437.1 104.8 875.74 S 3323.71 E
8520.00 35.90 105.46 0.44 7228.69 3448.8 104.8 878.84 S 3334.97 E
8540.00 36.03 105.96 0.40 7244.88 3460.6 104.8 882.02 S 3346.28 E
8560.00 36.27 106.27 0.38 7261.03 3472.4 104.8 885.29 S 3357.61 E
8580.00 36.52 106.55 0.37 7277.13 3484.2 104.8 888.65 S 3369.00 E
8600.00 36.73 107.37 0.67 7293.18 3496.1 104.8 892.13 S 3380.41 E
8620.00 36.95 107.99 0.54 7309.18 3508.1 104.8 895.77 S 3391.84 E
8640.00 37.21 108.18 0.36 7325.14 3520.2 104.8 899.51 S 3403.30 E
8660.00 37.52 108.43 0.42 7341.04 3532.3 104.8 903.33 S 3414.82 E
8680.00 37.76 108.70 0.37 7356.87 3544.5 104.8 907.22 S 3426.40 E
8700.00 38.02 109.17 0.48 7372.66 3556.7 104.8 911.20 S 3438.02 E
~.
A Gyrodata Directional Survey
B.P. EXPLORATION ALASKA
Location: MAST UNIT,
Lease: J-PAD Well: J - 17B
Job Number: AK0805G 560
MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOS URE HORI ZONTAL
DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet deg. feet
25 ft.
~%
t
8720.00 38.12 109.60 0.36 7388.40 3569.0 104.9 915.30 S 3449.65 E
8740.00 38.35 110.19 0.54 7404.11 3581.3 104.9 919.51 S 3461.29 E
8760.00 38.47 110.80 0.49 7419.78 3593.7 104.9 923.86 S 3472.93 E
8780.00 38.85 111.35 0.64 7435.40 3606.1 104.9 928.35 S 3484.59 E
8800.00 39.04 112.25 0.74 7450.96 3618.6 104.9 933.02 S 3496.26 E
8820.00 39.23 113.04 0.67 7466.47 3631.1 105.0 937.88 S 3507.91 E
8840.00 39.43 112.95 0.26 7481.94 3643.7 105.0 942.83 S 3519.58 E
8860.00 38.91 112.28 0.84 7497.45 3656.2 105.0 947.69 S 3531.24 E
8880.00 38.97 112.15 0.13 7513.00 3668.7 105.0 952.44 S 3542.87 E
8899.28 39.07 112.70 0.47 7527.98 3680.7 105.1 957.07 S 3554.09 E
Final Station Closure: Distance: 3680.70 ft Az: 105.07 deg.
Survey QC - RGS-Cpecification Sheet `
/r
SURVEY QUALITY CONTROL -SPECIFICATION DATA
PRE-]OB CALIBRATION VERIFICATION CHECK (ROLL TEST)
Station ToolFace Gravity Error Scale Factor Rate Error
(deg) (Mg) Uncertainty (deg/min)
32 226.15 -244.92 -0.00006116 1.12
31 226.15 -255.52 -0.00006381 1.15
30 226.15 -243.15 -0.00006072 0.96
29 226.15 -232.51 -0.00005806 2.63
28 134.82 -347.34 -0.00008682 -1.41
27 134.82 -343.64 -0.00008590 -0.59
26 134.82 -346.15 -0.00008653 0.08
25 134.82 -346.93 -0.00008672 -0.90
24 44.20 -251.53 -0.00006282 -6.92
23 44.20 -285.27 -0.00007124 -6.62
22 44.20 -295.23 -0.00007372 -5.93
21 44.20 -289.05 -0.00007218 -3.23
20 313.67 -348.25 -0.00008705 -1.09
19 313.67 -353.91 -0.00008846 -1.19
18 313.67 -356.91 -0.00008921 -1.16
17 313.67 -349.99 -0.00008748 -1.05
16 316.76 -322.54 -0.00008064 -6.20
15 316.76 -323.41 -0.00008085 -5.25
14 316.76 -318.90 -0.00007973 -4.17
13 316.77 •323.55 -0.00008089 -1.35
12 224.02 -215.56 -0.00005384 1.23.
11 224.02 -216,08 -0.00005397 3.00
10 224.02 -222.00 -0.00005545 3.83
9 224.02 -222.19 -0.00005549 10.13
8 134.04 -316.71 -0.00007917 -7.38
7 134.04 -309.65 -0.00007741 -5.93
6 134.04 -314.27 -0.00007856 -5.50
5 134.04 -313.27 -0.00007831 -5.38
4 44.39 -213.78 -0.00005339 -20.13
3 44.39 -185.37 -0.00004630 -18.64
2 44.39 -188.73 -0.00004714 -18.44
1 44.39 -164.79 -0.00004116 -18.00
MBO = 1.27 Gravity Error = -283.16
Scale Factor Uncertainty = -0.00007076 Rate Error = -3.82
POST-JOB CALIBRATION VERIFICATION CHECK (ROLL TEST)
Station ToolFace Gravity Error Scale Factor Rate Error
(deg) (Mg) Uncertainty (deg/min)
65 44.91 -122.11 -0.00003050 -16.78
64 44.91 -139.68 -0.00003489 -16.70
63 44.91 -131.86 -0.00003294 -15.78
62 44.91 -142.19 -0.00003552 -13.06
61 135.41 -208.99 -0.00005226 13.78
60 135.41 -210.86 -0.00005272 15.51
59 135.41 -201.13 -0.00005029 17.89
58 135.41 -196.78 -0.00004921 18.97
57 225.27 -133.30 -0.00003330 24.65
56 225.27 -135.51 -0.00003385 25.79
55 225.27 -127.53 -0.00003185 23.71
54 225.27 -131.86 -0.00003294 26.04
53 316.17 -225.28 -0.00005633 -8.93
52 316.17 -226.21 -0.00005656 -9.74
51 316.17 -237.20 -0.00005931 -9.60
50 316.17 -236.34 -0.00005909 -10.54
49 314.94 -155.77 -0.00003895 -11.02
47 314.94 -160.42 -0.00004011 -11.49
46 314.94 -158.50 -0.00003964 -12.42
45 314.94 -155.01 -0.00003876 -11.46
SURV-Q367 (OPS SUR-MA-003) 19`" Nov 03 /Rev 35 Page 1 of 10 AKOSOSG_560
Survey QC - RGS-CT~pecification Sheet `~ ~ i!
~~
44 225.63 -83.09 -0.00002075 19.49
43 225.63 -75.35 -0.00001882 19.25
42 225.63 -81.50 -0.00002036 20.59
41 225.63 -82.00 -0.00002048 20.69
40 136.91 -174.48 -0.00004364 21.64
39 136.91 -169.94 -0.00004250 21,61
38 136.91 -173.88 -0.00004348 22.13
37 136.91 -180.75 -0.00004520 23.38
36 45.90 -140.47 -0.00003508 -15.16
35 45.90 -173.03 -0.00004322 -16.30
34 45.90 -186.65 -0.00004661 -15.86
33 45.90 -208.06 -0.00005196 -15.22
MBO = 0.96 Gravity Error = -161.43
Scale Factor Uncertainty = -0.00004035 Rate Error = 3.91
TNTTTAI TC ATTf1N
Gyro Compass
Reading /Station
Raw Inclination
Raw Azimuth
Abs (ERMeas ERTneo)
63 12.88 88.55 0.0295
64 12.88 88.49 0.0036
Average 12.88 88.52 0.0166
Tolerance on Average* 0.0821
Standard Deviation 0.00 0.02 0.0129
Tolerance on St. Dev.** 0.1~ 0.2o 0.0367
Advanced Initialisation Azimuth
Advanced Initialisation Standard Deviation Tolerance = TBA
" Tolerance on Average of earth horizontal rate difference is given by (1/Cosh * J[(COSA*Sinl*D.1)2+D na2~/hr
"* Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/Cost) *J[(COSA*SinI*0.1)2+(0.082/(n-1))] ~/hr
r1RTFT TIINFC
Drift Tune
Number Ending
Time Ending
Depth Ending
Inclination Ending
Azimuth Residual Gx Bias Residual Gy Bias
Start End Start End
1 1184.65 5098.34 44.00 104.79 -0.000 0.000 0.000 -0.000
2 865.84 6449.88 45.52 110.98 0.000 -0.001 0.011 -0.012
3 653.49 7187.14 44.18 111.61 -0.005 0.005 0.002 -0.002
4 319.55 7320.13 43.45 110.74 -0.004 0.003 0.002 -0.002
5 441.02 7804.69 40.54 110.64 0.001 -0.001 0.001 -0.001
6 289.16 7960.14 34.91 102.58 0.005 -0.005 0.002 -0.002
7 410.66 8275.12 34.65 103.52 0.003. -0.004 0.007 -0.007
8 395.39 8464.97 34.78 105.50 0.001 -0.002 -0.001 0.001
9 486.56 8780.03 38.64 112.03 0.000 -0.001 0.008 -0.008
10 380.23 8949.41 38.35 112.72 0.004 -0.004 0.000 -0.000
11 410.52 8744.98 38.16 110.37 0.008 -0.008 0.003 -0.003
12 562.43 8425.10 34.70 103.55 -0.002 0.001 -0.004 0.004
13 349.84 8262.65 34.65 102.17 0.003 -0.004 0.002 -0.002
14 425.85 7955.03 35.01 101.05 -0.001 -0.000 -0.001 0.001
15 395.57 7800.17 39.72 110.46 0.001 -0.002 -0.000 0.000
16 334.67 7800.32 40.51 111.15 -0.000 -0.000 0.001 -0.001
17 592.78 7310.09 43.53 111.21 -0.005 0.005 -0.005 0.005
SURV-Q 167 (OPS SUR-MA-003) 19~" Nov 03 /Rev 15 Page 2 of 10 AK0805G_560
Survey QC - RGS-C-f~`'S~pecification Sheet ~' ~ _
18 349.86 7165.23 44.35 110.87 -0.006 0.005 -0.004 0.004
19 1366.77 5070.30 44.29 104.73 -0.002 -0.000 -0.005 0.003
20 349.86 5065.30 44.10 104.42 0.002 -0.003 -0.001 0.001
21 319.59 4861.99 44.53 104.22 0.004 -0.005 0.001 -0.002
22 1063.25 3200.17 13.20 88.36 -0.000 -0.002 -0.000 0.002
Average 0.000 -0.001 0.001 -0.001
Standard Deviation 0.003 0.003 0.004 0.004
Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033°/hr 0.033°/hr 0.033°/hr
INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON
Depth Corrected Inclination Corrected Azimuth
Inrun Outrun Difference Inrun Outrun Difference
100.00 0.35 0.35 0.00 271.74 271.74 0.00
200.00 0.38 0.38 0.00 257.90 257.90 0.00
300.00 0.55 0.55 0.00 258.91 258.91 0.00
400.00 0.63 0.63 0.00 240.42 240.42 0.00
500.00 0.58 0.58 0.00 214.97 214.97 0.00
600.00 0.39 0.39 0.00 196.77 196.77 0.00
700.00 0.50 0.50 0.00 157.55 157.55 0.00
800.00 0.62 0.62 0.00 129.10 129.10 0.00
900.00 0.78 0.78 0.00 114.50 114.50 0.00
1000.00 0.82 0.82 0.00 103.71 103.71 0.00
1100.00 0.90 0.90 0.00 103.09 103.09 0.00
1200.00 0.55 0.55 0.00 100.45 100.45 0.00
1300.00 0.40 0.40 0.00 89.85 89.85 0.00
1400.00 0.24 0.24 0.00 102.96 102.96 0.00
1500.00 0.48 0..48 0.00 324.12 324.12 0.00
1600.00 0.91 0.91 0.00 344.76 344.76 0.00
1700.00 0.46 0.46 0.00 346.47 346.47 0.00
1800.00 0.20 0.20 0.00 285.35 285.35 0.00
1900.00 0.10 0.10 0.00 325.98 325.98 0.00
2000.00 0.33 0.33 0.00 41.49 41.49 0.00
2100.00 0.18 0.18 0.00 158.99 158.99 0.00
2200.00 0.26 0.26 0.00 155.84 155.84 0.00
2300.00 0.35 0.35 0.00 149.96 149.96 0.00
2400.00 0.61 0.61 0.00 141.76 141.76 0.00
2500.00 0.37 0.37 0.00 135.90 135.90 0.00
2600.00 0.28 0.28 0.00 139.62 139.62 0.00
2700.00 0.53 0.53 0.00 108.28 108.28 0.00
2800.00 6.00 6.00 0.00 85.98 85.98 0.00
2900.00 8.09 8.09 0.00 84.62 84.62 0.00
3000.00 9.67 9.67 0.00 85.60 85.60 0.00
3100.00 10.73 10.73 0.00 86.97 86.97 0.00
3200.00 12.89 13.23 -0.33 89.00 88.38 0.62
3220.00 14.06 14.63 -0.57 87.72 87.55 0.16
3240.00 15.03 15.36 -0.33 87.36 87.19 0.17
SURV-Qi67 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 3 of 10 AK OSOSG_560
Surve p ~
y QC - RGS-C1'"S ecification Sheet `~ `
3260.00 15.84 16.21 -0.37 87.41 87.39 0.02
3280.00 16.47 16.66 -0.19 87.43 87.19 0.24
3300.00 17.01 17.26 -0.25 87.56 87.47 0.09
3320.00 17.46 17.59 -0.13 87.72 87.53 0.19
3340.00 17.91 18.18 -0.27 87,59 87.39 0.20
3360.00 18.48 18.60 -0.12 87.43 87.54 -0.11
3380.00 18.91 19.27 -0.36 87.46 87.42 0.04
3400.00 19.58 19.74 -0.16 87.38 87.17 0.20
3420.00 20.08 20.53 -0.45 87.45 87.23 0.22
3440.00 20.84 20.97 -0.14 87.66 87.18 0.48
3460.00 21.28 21.53 -0.24 87.46 87.50 -0.04
3480.00 21.89 21.97 -0.08 87.62 87.48 0.14
3500.00 22.26 22.57 -0.31 87.90 87.80 0.10
3520.00 22.88 23.04 -0.16 88.42 88.23 0.18
3540.00 23.22 23.37 -0.15 88.46 88.12 0.34
3560.00 23.72 23.85 -0.13 88.73 88.59 0.14
3580.00 24.06 24.24 -0.18 88.54 88.76 -0.23
3600.00 24.48 24.65 -0.17 89.05 88.89 0.16
3620.00 24.7.7 24.93 -0.16 89.10 88.84 0.26
3640.00 25.19 25.42 -0.23 89.31 89.04 0.27
3660.00 25.63 25.84 -0.21 89.45 89.40 0.05
3680.00 26.27 26.55 -0.28 89.79 89.52 0.27
3700.00 26.78 26.90 -0.12 89.76 89.65 0.11
3720.00 27.29 27.54 -0.25 89.68 89.63 0.04
3740.00 27.95 28.17 -0.22 89.84 89.73 0.11
3760.00 28.57 29.02 -0.45 89.91 89.88 0.03
3780.00 29.50 29.81 -0.31 90.45 90.51 -0.06
3800.00 30.23 30.57 -0.34 90.96 90.80 0.17
3820.00 30.76 30.93 -0.17 91.18 91.06 0.12
3840.00 31.13 31.32 -0.19 91.22 91.21 0.01
3860.00 31.63 31.85 -0.21 91.69 91.50 0.19
3880.00 32.12 32.35 -0.23 91.86 91.81 0.05
3900.00 32.72 32.92 -0.20 92.57 92.55 0.02
3920.00 33.12 33.33 -0.21 92.93 93.00 -0.07
3940.00 33.54 33.75 -0.21 93.94 94.04 -0.10
3960.00 33.93 34.13 -0.20 94.58 94.66 -0.08
3980.00 34.31 34.53 -0.22 95.71 95.98 -0.27
4000.00 34.80 35.02 -0.23 96.54 96.54 0.00
4020.00 35.34 35.71 -0.37 97.18 97.19 -0.01
4040.00 35.91 36.20 -0.29 97.43 97.46 -0.04
4060.00 36.64 37.11 -0.47 98.28 98.33 -0.04
4080.00 37.55 37.99 -0.43 98.55 98.36 0.19
4100.00 38.81 39.55 -0.74 98.32 98.12 0.20
4120.00 40.11 40.47 -0.36 98.16 97.99 0.17
4140.00 41.03 41.51 -0.49 98.09 97.81 0.28
SURV-Q367 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 4 of 10 AKOSOSG_560
~~
Survey QC - RGS-Cl~'S'pecification Sheet `~/
4160.00 42.02 42.28 -0.27 97.89 97.89 0.01
4180.00 42.69 43.06 -0.37 98.37 98.64 -0.26
4200.00 43.58 43.87 -0.29 99.67 99.91 -0.24
4220.00 44.04 44.24 -0.20 100.50 100.54 -0.05
4240.00 44.40 44.64 -0.24 100.86 100.76 0.09
4260.00 44.84 45.00 -0.16 100.98 100.78 0.20
4280.00 45.14 45.31 -0.17 101.02 100.85 0.17
4300.00 45.31 45.34 -0.02 101.16 101.03 0.13
4320.00 45.22 45.28 -0.06 101.40 101.27 0.13
4340.00 45.20 45.09 0.11 101.59 101.46 0.14
4360.00 44.80 44.82 -0.02 101.82 101.71 0.11
4380.00 44.78 44.82 -0.04 102.05 101.94 0.11
4400.00 44.71 44.78 -0.07 102.16 102.08 0.07
4420.00 44.69 44.78 -0.08 102.45 102.25 0.20
4440.00 44.60 44.53 0.07 102.71 102.60 0.12
4460.00 44.64 44.62 0.02 102.90 102.79 0.11
4480.00 44.42 44.34 0.08 103.10 103.04 0.05
4500.00 44.29 44.38 -0.09 103.23 103.13 0.10
4520.00 44.42 44.39 0.02 103.19 103.29 -0.10
4540.00 44.46 44.46 -0.01 103.27 103.24 0.03
4560.00 44.45 44.44 0.01 103.41 103.27 0.15
4580.00 44.38 44.51 -0.13 103.43 103.30 0.12
4600.00 44.43 44.46 -0.03 103.43 103.21 0.22
4620.00 44.41 44.46 -0.06 103.40 103.21 0.19
4640.00 44.44 44.40 0.04 103.45 103.26 0.19
4660.00 44.31 44.41 -0.11 103..30 103.18. 0.12
4680.00 44.39 44.45 -0.06 103.27 103.20 0.07
4700.00 44.42 44.52 -0.10 103.27 103.24 0.03
4720.00 44.65 44.70 -0.05 103.29 103.24 0.05
4740.00 44.49 44.47 0.02 103.41 103.44 -0.03
4760.00 44.41 44.48 -0.07 103.71 103.70 0.01
4780.00 44.37 44.46 -0.09 104.00 103.96 0.04
4800.00 44.47 44.50 -0.03 104.23 104.20 0.03
4820.00 44.39 44.55 -0.15 104.41 104.30 0.11
4840.00 44..56 44.63 -0.07 104.38 104.28 0.10
4860.00 44.50 44.55 -0.05 104.22 104.25 -0.03
4880.00 44.55 44.65 -0.10 104.34 104.27 0.07
4900.00 44.66 44.68 -0.02 104.31 104.14 0.16
4920.00 44.67 44.72 -0.05 104.24 104.10 0.14
4940.00 44.71 44.73 -0.02 104.26 104.19 0.08
4960.00 44.64 44.69 -0.05 104.32 104.22 0.09
4980.00 44.61 44.58 0.03 104.47 104.51 -0.04
5000.00 44.35 44.46 -0.11 104.56 104.38 0.18
5020.00 44.40 44.31 0.08 104.43 104.25 0.18
5040.00 44.16 44.22 -0.06 104.50 104.37 0.14
SURV-Q167 (OPS S UR-MA-003) 19'" Nov 03 /Rev 15 Page 5 of 10 AK0805G_560
,~ I
Survey QC - RGS-CT``S`pecification Sheet `'~°'
5060.00 44.20 44.23 -0.03 104.57 104.40 0.17
5080.00 44.19 44.05 0.14 104.45 104.21 0.24
5100.00 43.87 43.76 0.10 104.74 104.25 0.49
5120.00 43.94 43.92 0.02 104.65 104.18 0.48
5140.00 43.93 43.86 0.08 104.61 104.18 0.43
5160.00 43.93 43.92 0.01 104.71 104.27 0.44
5180.00 43.96 43.86 0.10 104.93 104.49 0.45
5200.00 43.95 43.99 -0.04 104.95 104.47 0.48
5220.00 43.94 43.77 0.17 105.07 104.57 0.49
5240.00 43.75 43.71 0.04 105.12 104.77 0.34
5260.00 43.78 43.74 0.04 105.24 104.78 0.46
5280.00 43.80 43.85 -0.05 105.14 104.77 0.37
5300.00 43.98 43.97 0.01 105.29 104.75 0.54
5320.00 44.12 44.16 -0.04 105.15 104.73 0.41
5340.00 44.40 44.40 0.00 105.24 104.86 0.38
5360.00 44.46 44.45 0.01 105.25 104.89 0.36
5380.00 44.56 44.56 -0.01 105.34 105.05 0.29
5400.00 44.53 44.52 0.01 105.57 105.22 0.35
5420.00 44.55 44.55 0.01 105.69 105.37 0.32
5440.00 44.48 44.34 0.14 105.91 105.42 0.49
5460.00 44.36 44.32 0.03 105.87 105.47 0.40
5480.00 44.39 44.35 0.04 105.91 105.43 0.48
5500.00 44.60 44.57 0.03 105.95 105.62 0.33
5520.00 44.66 44.56 0.10 106.03 105.52 0.51
5540.00 44.63 44.59 0.05 105.95 105.50 0.45
5560.00 44.65 44.61 0.03 105.90 105.39 0:51
5580.00 44.77 44.87 -0.09 105.87 105.42 0.45
5600.00 45.03 45.03 -0.01 106.00 105.62 0.38
5620.00 45.13 45.18 -0.04 106.14 105.76 0.38
5640.00 45.31 45.26 0.06 106.27 106.00 0.27
5660.00 45.28 45.26. 0.02 106.55 106.24 0.31
5680.00 45.45 45.28 0.17 106.95 106.78 0.17
5700.00 45.26 45.25 0.01 107.30 107.01 0.29
5720.00 45.45 45.37 0.07 107.42 107.17 0.25
5740.00 45.32 45.36 -0.04 107.66 107.37 0.29
5760.00 45.47 45.44 0.02 107.80 107.48 0.32
5780.00 45.38 45.38 -0.00 107.83 107.50 0.33
5800.00 45.54 45.54 0.01 107.91 107.62 0.29
5820.00 45.50 45.49 0.00 107.97 107.56 0.40
5840.00 45.64 45.61 0.04 107.96 107.69 0.27
5860.00 45.41 45.34 0.07 108.39 108.05 0.33
5880.00 45.43 45.44 -0.01 108.51 108.22 0.28
5900.00 45.37 45.37 -0.00 108.85 108.52 0.33
5920.00 45.41 45.40 0.01 109.02 108.72 0.29
5940.00 45.27 45.12 0.15 109.32 109.03 0.29
SURV-Q 167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 6 of 10 AK0805G_560
Survey QC - RGS-CT~S~pecification Sheet ~ `
5960.00 45.20 45.15 0.05 109.54 109.36 0.18
5980.00 45.09 44.97 0.12 109.85 109.57 0.28
6000.00 44.99 44.93 0.05 110.13 109.86 0.28
6020.00 44.73 44.64 0.09 110.31 109.93 0.38
6040.00 44.75 44.88 -0.13 110.39 110.00 0.39
6060.00 45.00 45.00 -0.00 110.48 110.03 0.45
6080.00 45.22 45.26 -0.04 110.47 110.07 0.40
6100.00 45.29 45.23 0.06 110.58 110.25 0.32
6120.00 45.35 45.38 -0.03 110.58 110.30 0.28
6140.00 45.40 45.40 0.00 110.76 110.46 0.31
6160.00 45.39 45.44 -0.05 110.71 110.32 0.39
6180.00 45.49 45.30 0.19 110.83 110.44 0.39
6200.00 45.22 45.20 0.02 110.67 110.46 0.22
6220.00 45.18 45.07 0.11 111.00 110.69 0.31
6240.00 45.03 45.10 -0.07 110.78 110.43 0.35
6260.00 45.16 45.16 -0.00 110.65 110.31 0.34
6280.00 45.28 45.29 -0.01 110.69 110.38 0.30
6300.00 45.54 45.46 0.08 110.77 110.42 0.35
6320.00 45.49 45.45 0.04 110.70 110:.38 0.32
6340.00 45.46 45.33 0.13 110.63 110.36 0.27
6360.00 45.22 45.16 0.06 110.72 110.43 0.30
6380.00 45.10 45.01 0.09 110.88 110.60 0.28
6400.00 44.99 44.99 -0.00 110.95 110.56 0.39
6420.00 45.28 45.27 0.01 110.92 110.54 0.38
6440.00 45.35 45.45 -0.10 110.99 1.10.58 0.41
6460.00 45.53- 45.74 -0.21 111.00 110:69 0.31
6480.00 45.51 45.66 -0.15 111.00 110.67 0.33
6500.00 45.49 45.39 0.11 110.99 110.60 0.39
6520.00 45.43 45.42 0.01 110.99 110.52 0.47
6540.00 45.72 45.70 0.02 110.93 110.68 0.25
6560.00 45.90 45.89 0.01 111.03 110.66 0.37
6580.00 46.05 45.92 0.13 111.00 110.63 0.37
6600.00 45.85 45.80 0.05 111.02 110.65 0.37
6620.00 45.89 45.95 -0.06 111.17 110.75 0.42
6640.00 45.84 45.85. -0.01 111.04 110.71 0.33
6660.00 45.89 45.80 0.10 111.13 110.64 0.49
6680.00 45.73 45.65 0.08 111.16 110.71 0.45
6700.00 45.76 45.64 .0.12 111.20 110.82 0.38
6720.00 45.64 45.54 0.10 111.27 110.89 0.38
6740.00 45.59 45.49 0.10 111.35 111.12 0.23
0 6760.00 45.35 45.26 0.08 111.45 111.13 0.31
6780.00 45.39 45.35 0.04 111.48 111.22 0.26
6800.00 45.24 45.12 0.12 111.54 111.22 0.32
6820.00 45.23 45.24 -0.01 111.58 111.14 0.44
6840.00 45.21 45.03 0.18 111.44 111.02 0.42
SURV-Q 167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 7 of 30 AK0805G_560
Survey QC - RGS-C~`"5~pecification Sheet ~`~' '~~
6860.00 45.15 45.11 0.04 111.39 110.98 0.41
6880.00 45.18 45.05 0.13 111.38 110.94 0.43
6900.00 45.23 45.19 0.04 111.21 110.85 0.37
6920.00 45.25 45.03 0.22 111.26 110.99 0.27
6940.00 45.00 44.94 0.07 111.19 110.88 0.31
6960.00 44.99 44.86 0.14 111.17 110.80 0.37
6980.00 44.78 44.75 0.02 111.09 110.75 0.33
7000.00 44.85 44.63 0.22 111.13 110.79 0.34
7020.00 44.56 44.45 0.11 111.12 110.73 0.38
7040.00 44.68 44.58 0.10 110.94 110.65 0.29
7060.00 44.54 44.44 0.10 111.15 110.88 0.27
7080.00 44.56 44.36 0.20 111.13 110.78 0.35
7100.00 44.27 44.09 0.18 111.09 110.67 0.42
7120.00 44.33 44.20 0.12 111.15 110.79 0.36
7140.00 44.15 44.06 0.09 111.15 110.91 0.24
7160.00 44.42 44.40 0.02 111.23 110.90 0.33
7180.00 44.00. 44.06 -0.06 110.86 110.84 0.02
7200.00 43.70 43.54 0.16 110.75 110.73 0.02
7220.00 43.71 43.76 -0.05 110.33 110.66 -0.33
7240.00 43.72 43.61 0.11- 110.35 110.80 -0.45
7260.00 43.50 43.60 -0.10 110.50 110.97 -0.48
7280.00 43.44 43.40 0.04 110.63 111.10 -0.48
7300.00 43.33 43.49 -0.16 110.87 111.26 -0.39
7320.00 43.46 43.32 0.15 110.74 111.26 -0.51
7340.00 43.09 42.93 0.17 110.74 110.97 -0.23
7360.00 42.90 42.97 -0.07 110.75 111.13 -0.38
7380.00 43.07 43.00 0.07 110.86 111.11 -0.25
7400.00 42.85 42.91 -0.06 110.84 111.20 -0.36
7420.00 42.91 42.86 0.05 111.11 111.37 -0.25
7440.00 42.54 42.47 0.07 111.22 111.54 -0.31
7460.00 42.51 42.49 0.03 111.29 111.57 -0.28
7480.00 42.38 42.37 0.01 111.28 111.43 -0.16
7500.00 42.56 42.40 0.15 111.10 111.37 -0.27
7520.00 42.24 42.21 0.03 111.12 111.58 -0.46
7540.00 42.32 42.26 0..05 111.26 111.61 -0.35
7560.00 42.03 42.00 0.02 111.40 111.64 -0.25
7580.00 42.03 42.05 -0.02 111.51 111.76 -0.26
7600.00 41.83 41.89 -0.05 111.52 111.78 -0.26
7620.00 41.83 41.86 -0.03 111.69 111.93 -0.23
7640.00 41.68 41.64 0.04 111.60 111.85 -0.25
7660.00 41.61 41.68 -0.07 111.75 112.02 -0.26
7680.00 41.44 41.48 -0.04 111.78 112.01 -0.23
7700.00 41.42 41.47 -0.04 111.43 111.72 -0.29
7720.00 41.25 41.30 -0.06 111.35 111.83 -0.48
7740.00 41.10 41.13 -0.04 111.74 112.32 -0.58
SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 8 of 10 AK0S0SG_560
Survey QC - RGS-Cpecification Sheet `-~-~' "~~
7760.00 40.99 40.96 0.03 112.18 112.52 -0.34
7780.00 40.81 40.87 -0.05 111.93 112.13 -0.21
7800.00 39.82 39.87 -0.05 110.58 110.66 -0.09
7820.00 40.24 39.94 0.30 110.12 109.78 0.34
7840.00 39.22 38.92 0.30 108.49 107.97 0.52
7860.00 38.58 38.39 0.19 107.04 106.77 0.27
7880.00 37.90 37.47 0.43 106.24 106.10 0.14
7900.00 36.38 35.93 0.45 104.91 104.77 0.14
7920.00 35.14 35.01 0.14 104.00 103.97 0.02
7940.00 34.67 34.71 -0.03 102.30 102.10 0.20
7960.00 34.90 34.86 0.03 100.81 100.79 0.02
7980.00 34.79 34.57 0.23 100.78 101.30 -0.52
8000.00 34.80 34.81 -0.00 100.59 100.85 -0.27
8020.00 34.86 34.77 0.09 100.21 100.62 -0.41
8040.00 34.62 34.57 0.05 100.08 100.42 -0.33
8060.00 34.61 34.52 0.09 100.14 100.46 -0.32
8080.00 34.49 34.45 0.04 100.12 100.51 -0.39
8100.00 34,54 34.55 -0.01 100.24 100.69 -0.45
8120.00 34.43: 34.41 0.02 100.40 100.87 -0..47
8140.00 34.42 34.50 -0.08 101.07 101.55 -0.48
8160.00 34.51 34.53 -0.02 100.72 100.87 -0.15
8180.00 34.68 34.69 -0.01 100.37 100.89 -0.52
8200.00 34.57 34.53 0.04 100.73 101.38 -0.66
8220.00 34.56 34.64 -0.09 101.37 101.87 -0.50
8240.00 34.63 34.62 0.01 101.32 101.79 -0.47.
8260.00 34.64 34.69 -0.05 101.53 102.15 -0.62
8280.00 34.67 34.62 0.05 101.76 102.29 -0.53
8300.00 34.51 34.49 0.02 101.76 102.35 -0.59
8320.00 34.43 34.44 -0.01 101.96 102.53 -0.57
8340.00 34.42 34.41 0.02 102.10 102.72 -0.62
8360.00 34.32 34.39 -0.07 102.53 103.07 -0.54
8380.00 34.45 34.55 -0.10 102.74 103.15 -0.41
8400.00 34.51 34.59 -0.09 102.36 102.91 -0.55
8420.00 34.79 34.91 -0.13 102.73 103.37 -0.64
8440.00 35.00 34.91 0.08 104.21 104.34 -0.14
8460.00 34.74 35.00 -0.26 103.60 104.32 -0.73
8480.00 34.93 35.31 -0.37 104.16 104.94 -0.78
8500.00 35.30 35.56 -0.26 104.71 105.27 -0.56
8520.00 35.54 35.90 -0.35 104.83 105.46 -0.63
8540.00 35.83 36.03 -0.20 105.33 105.96 -0.62
8560.00 35.95 36.27 -0.33 105.54 106.27 -0.73
8580.00 36.27 36.52 -0.25 105.95 106.55 -0.60
8600.00 36.45 36.73 -0.28 106.57 107.37 -0.81
8620.00 36.82 36.95 -0.13 107.25 107.99 -0.75
8640.00 37.01 37.21 -0.20 107.54 108.18 -0.65
SURV-Q167 (OPS SUR-MA-003) 19'" Nov 03 /Rev 15 Page 9 of 10 AK0805G_560
%:.,
Survey QC - RGS-Cl~'`~pecification Sheet ~'~ ~~''~
~~
8660.00 37.37 37.52 -0.14 107.77 108.43 -0.67
8680.00 37.49 37.76 -0.27 108.12 108.70 -0.59
8700.00 37.82 38.02 -0.20 108.51 109.17 -0.66
8720.00 37.88 38.12 -0.24 109.06 109.60 -0.55
8740.00 38.24 38.35 -0.11 109.30 110.19 -0.89
8760.00 38.58 38.47 0.11 110.35 110.80 -0.45
8780.00 38.72 38.85 -0.13 110.29 111.35 -1.06
8800.00 38.97 39.04 -0.07 111.08 112.25 -1.17
8820.00 39.18 39.23 -0.04 111.82 113.04 -1.22
8840.00 39.41 39.43 -0.02 111.92 112.95 -1.03
8860.00 39.01 38.91 0.10 111.36 112.28 -0.92
8880.00 39.00 38.97 0.03 111.09 112.15 -1.05
8949.41 38.48 38.48 0.00 110.97 110.97 0.00
8899.28 39.07 39.07 0.00 112.70 112.70 0.00
Average -0.0398 0.0326
Standard Deviation 0.1502 0.3734
Tolerance for both the Average and the Standard
Deviation Casing 0.3°
Drill i e 0.3° Casing 0.5°
Drill i e 0.75°
* Inclination and Azimuth interpolated to same depths as shown.
SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 10 of 10 AK0805G_560
Survey QC - RGS-C Analysis Sheet Y
SURVEY QUALITY CONTROL -DATA ANALYSIS
REFERENCE SYSTEMS
Grid S stem Grid Correction 0.00
Azimuth reference: Grid True North TRUE NORTH
Vertical reference: RKB MSL Other RKB If other ive details
TIE ON DATA
De th 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00
Northin s 0.00 Eastin s 0.00 Latitude 70.3269
Az. Ref: Grid True T Grid Corrected Y/N? N Descri tion
CALIBRATION
Tool Number 2081 Calibration Date 22 Mar 2005
OPERATING TEMPERATURE
Calibration ran a From 50.57 To 119.54
G ro o eratin ran a From 89.48 To 99.21 Sec' -Within calibration ran e
FIELD ROLL TEST Onl valid on fixed structures. When not ossible in ut roll test data erformed after return to base
Cal value Pre 'ob offset Post 'ob offset Abs dif.cal, ost Abs dif. re. ost Sec'
Accel Scale 0.000000 0.000000 N A Cal Post - 0.00015
Mass Unbalance 0.00 0.00 N/A Pre Post - 0.4° hr
INITIALISATION
De th A rox 3200.00 No of stns 2 Sec' -Min No. - 6
Azimuth Mean 87.63 Std deviation .0.02 Sec' - Azi SD 0.2°
Inclination Mean 12.88 Std deviation 0.00 Sec' -Inc SD 0.1°
Earth Horizontal Rate Mean Abs meas-theor 0.02 Std deviation 0.01 Sec' -See 167
DRIFT TUNE
Residual x ro bias Mean -0.001 Std dev' 0.003 Sec's -Mean and SD - 0.333°/hr
Residual ro bias Mean -0.001 Std dev' 0.004 Sec's -Mean and SD - 0.333°/hr
TOOLFACE RATE
Maximum toolface rate 9.65 Sec' - 400° sec
IN/OUT COMPARISON (AZI' N/A IF INC' <15°)
Inclination Difference Mean -0.04 Std dev' 0.15 Sec's -Casin 0.3° Drill i e 0.3°
Azimuth Difference Mean 0.03 Std dev' 0.37 Sec's -Casin 0.5° Drill i e 0.75°
Lateral Diver ence 1000 0.67 Sec - 5.0 1000
Vertical Diver ence/1000 0.22 Sec' - 2.0/1000
DEPTH CONTROI
Wireline Com an SCHLUMBERER Line t e 15.32 Encoder SF
Max De th TD 8829.88 CCL Corrected YES
Zero De th Ri u 37.22' Rezero De th 14'
Given u 'oint de th Measured PJ
Strech cor. At TD divided b TD 1000 1.04 Sec' - 1.5/1000
Dif. Between ri u and rezero de the divided b TD/1000 1.34 Sec' - 2.0/1000
Dif. Between iven and meas de th divided b meas 1000 1.27 Sec' - 2.0/1000
SURV-Q165 (OPS SUR-MA-010) 22n° Jan 2004 /Revision 20 Page 1 of 1 AK0805G_560
~ .,~,
Survey QC - RGS-CT Acceptance Sheet
FIELD AND SURVEY INFORMATION
Operator B.P. EXPLORATION ALASKA
Field /Platform MAST UNIT
Well Number J-PAD J - 176
Survey section From 3200.00 ft. to 8949.41 ft.
Date 9/15/2005
Gyrodata Job No AK0805G 560
Gyrodata Surveyors Robert Williams
Job Objective High Accuracy Gyro Survey
SURVEY PERFORMANCE
In Spec'
QC Parameter Yes/No/NA Possible Actions
Contact Duty Engineer to discuss options:
Operational temperature within Yes 1. Recalibrate tool to higher temperature
specification 2. Resurvey with backup tool
3. Resurvey 'Hot' section at higher speed
Roll test data within specification Contact Duty Engineer to discuss options:
Only valid on land/fixed installations YES 1. Recalibrate tool and reprocess survey
2. Resurve with backu tool
Continuous initialisation within Take new initialisation, after three failures:
specification YES 1. Contact Duty Engineer or,
2. Resurve with backu tool.
Contact Duty Engineer to discuss options:
Toolface rate within specification Yes Resurvey section from previous bias check
Investi ate and comment if effects are ne li ible
Contact Duty Engineer to discuss options:
Drift tunes within specification Yes 1. Reprocess with different software settings
2. Resurve with backu tool
Inrun/Outrun comparison within Contact Duty Engineer to discuss options.
specification YES Resurvey is usually not required if either Inrun or outrun
meet all other C arameters
Depth control within specification YES Contact Duty Engineer to discuss options.
Action taken:
Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey.
SURVEY ACCEPTED Gyrodata Representative
Client's Representative
SURV-Q366 (OPS SUR-MA-003) 13`" Nov 03 /Revision 12 Page 1 of 1 AKOSOSG_560
v
B.P. EXPLORATION ALASKA
Well: J-PAD J - 17B
Location: MAST UNIT
45
40
35
30
z
0
~ 25
Q
z
J
U
z 20
15
10
5
0
Gyrodata
AK0805G_560 DEFINITIVE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - _ - - - - - - - - 1 - - - - - - - - - - - - - - - - - - - ' - -
, '~ ;
~ ~ ~ '
•
e
, e ,
-----,----------- ----------~--- --re r ---T----------~--------~-~---------- --- - ---
' ~ e ~ ~ ~ ' ~iOTTOM HOLE
.e e ', LOCATED
~ ~~ ~ ~ M D : 8899.28
•
f.
_ _ _ _ _ _ _ _ _ _ r _ _ _ _ _ _ _ _ _ _ r _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ } _ _ _ _ _ _ _ _ _ _ t _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Y _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~ _ _ _
' • ', '
e
e
a
----------~----------~----------~---a------~----------~----------~---------- ----------i-----------'----------~---
,
a '~
~ e
__________i_______________________~ _____________________________T__________T__________~___________,______________
,
• ~ ~ ,
,
I ;
,
• ,
---------------------~---------- ----------1----------~----------~---------- ----------_ -~
i ---------- --- ----
•
e
,
----------.----------r ----~----------,----------~---------- ------- ;---
,
,
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
MEASURED DEPTH (ft)
B.P. EXPLORATION ALASKA
Well: )-PAD ) - 17B
Location: MAST UNIT
350
300
250
200
~_
N
Q
150
100
50
Gyrodata
AK0805G_560 DEFINITIVE
• •
•
I
- ~~
- •
_ I ~ I ~ ~ I
• I
_ • ~
- •
' ' BOTTOM HOSE
'~
--------- !~~-~------~-----------~----------- - ------~----------------------------- ------~OCATEfl--~---
~ I ~ ~ ~ ~ MD:8899.28
•~~~
'~ '
- ~ I ~ ~ ~ I
- i
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
MEASURED DEPTH (ft)
B.P. EXPLORATION ALASKA
Well: )-PAD J - 17B
Location: MAST UNIT
7000
6000
5000
2
^~
LL
0 4000
J
Q
U
3000
2000
1000
0
Gyrodata
AK0805G_560 DEFINITIVE
~3OTTOM HOLE
LOCATED
--------------------- ------ ----------------------------------I------------- ------1~9D:-8899:2$---
I
I I I
I I I I
I, ~ I
I I I
II
I I I ~ I
-I---------- ---------- ----------~----------~-- ---- ----------~-----------~--------------- ~---
I ~ I -- 1 I I I
I ~ I I I
I I
I ~ I
~ i i I ~ I I
I I I i I I i
I I I
I I I ~ I
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ - - - - - - _ - ~ _ - - - _ _ _ _ - _ I - - - - _ _ _ - - - _ ._ - - - - _ _ _ _ _ _ _ _ _
- - -- ;- - - - - -- - -,- -I-
~ ~ I I I i
I I I
I i I I
I I ~ I
I I ~ I
I I I
I I I
~~ I I
----------I---------- s-- --~----------*----------~- -I-----------I---------- ------- --
-I-- -~--
~I I I I
~ I
I ~ I
I ~ I I I
~ I I
I I ~ I i I
I ~ I I
-I- ~~ -- --- --- -; -,- -,- -I- --
~ I
• I
I • I
•
~~~• I
- - - - - - - - - -~ - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - r - - - - - - - - - - t - - - - - - - - - - r - - - - - - - - - - r - - - - - - - - - -~- - - - - - - - - - "I- - - - - - - - - - -~ - - -
•; I
•
~ I I ~ I
~ I I I I I
~ I I I ~ I I I
~ I I
~ I I I I I
• i I I I I
~ ~ I I I I
i. i I I i i I I i I
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
MEASURED DEPTH (ft)
s
B.P. EXPLORATION ALASKA
Well: J-PAD J - 176
Location: MAST UNIT
5.0
4.5
4.0
3.5
~ 3.0
m
a~
2.5
w
w
w 2.0
J
1.5
4
Gyrodata
AK0805G_560 DEFINITIVE
I
----------I-----------~-----------'-----------~--- -~- -------------------------I -----.- ---;---
~, '
~, ~ ~ ~
~ ~
~ ~
~ •
~ ~ ~
----------,-----------,-----------,-----------,--f--------,-----------,-----------,-----------~-----------,----- ---
~ I~ i ~~
1'
'a ~ ~~
_ _•_ • i •
~ • I ----- - ---- ---
~~ i---i ~`~ i
' • •~~
-------- ~-------- -~----------~~-- RAM ~--®------- ~ ~ i ~ ~
~~ -~ - ~~
~, • ~ ~ • " » Vii' ~~. ~ w ~ '~~,* ~~ • ~; '~
1.0
0.5
0.0
0
1000
2000 3000. 4000 5000 6000 7000 8000 9000 10000
MEASURED DEPTH (ft)
B.P. EXPLORATION ALASKA
Well: J-PAD ) - 17B
Location: MAST UNIT
0
-100
-200
-300
.-. -400
.~
C7
z
i -500
O
z
-600
-700
-800
-900
-1000
r
Gyrodata
AK0805G_560 DEFINITIVE
---i~~r"s ----- --------------------------------------~--- ------------------- --------- -----
----.------------------------- -- -;--------------~------ 1-- ----'--------------'~-----
I
----,--------------.-------~-----~--------------i--------------r- T -----i -------.------
----
-------------=-- ----------~--------------~--------------~--------------1------------ ~--------BOTT0~4-I~ Off.
~, ~, LOCATED
', ', MD: 8$99.28
--
~ I
I I I ~
I I i I I
0 500 1000 1500 2000 2500 3000 3500
FASTING (ft)
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs_ Inserts\Microfilm _ Marker.doc
RECEIVED
-) STATE OF ALASKA ')
ALASKA JIL AND GAS CONSERVATION COMfvllSSION NOV 14 2005
WELL COMPLETION OR RECOMPLETION REPORT AND LOG AI k 0'1 & G C C ..
IS a I ,as ons. ommlSSI
Anchorage
1 a. Well Status: 0 Oil 0 Gas 0 Plugged IBI Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
801' SNL, 1806' WEL, SEC. 09, T11 N, R13E, UM
Top of Productive Horizon:
2489' SNL, 2433' EWL, SEC. 10, T11 N, R13E, UM
Total Depth:
2804' SNL, 1578' EWL, SEC. 10, T11N, R13E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 642547 y- _ 5970534 Zone-__ASP-±-'
TPI: x- 646822 y- 5968927 Zone- ASP4
Total Depth: x- 645973 y-----5968596 Zone- ASP4
._~....._.._........_.............._-_..._-- ,...........--......-----------.... ._----...-.....-........-..........._-
18. Directional Survey 0 Yes IBI No
21. Logs Run:
MWD ROP, GR, Memory GR, CNL, CCL
22.
Zero Other
5. Date Comp., Susp., or Aband.
9/5/2005
6. Date Spudded
01/04/2002
7. Date T.D. Reached
01/18/2002
8. KB Elevation (ft):
77'
9. Plug Back Depth (MD+ TVD)
11664 + 8998
10. Total Depth (MD+ TVD)
11731 + 8999
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH ,Me . SETTING . DEPTH TVD
SIZE WT. PER FT. GRADE , OP tsOTTOM"', OP '='OTTOM
20" x 30" Insulated Conductor Surface 110' Surface 110'
13-3/8" 72# L-80 Surface 2685' Surface 2685'
9-5/8" 47# L-80 Surface 9963' Surface 8364'
7" 26# L-80 9713' 10024' 8172' 84101
3-1/2" 9.2# L-80 9732' 10068' 8187' 84431
2-3/8" 4.43# L-80 9707' 11731' 8167' 89991
23. Perforations op'en to Production (MD + TVD of Top and 24.
Bottom Interval, Size and Number; if none, state "none"):
None
MD
TVD
MD
tit_I\NNED NO" 1. u¡ lOD5
26.
Date First Production:
Not on Production
Date of Test Hours Tested
CEMENTING" RECORD
8 cu yds Concrete
3856 cu ft Arcticset II I & II
2360 cu ft IG', 132 cu ft Permafrost
492 cu ft Class 'G'
42 cu ft Class 'G'
3" 70 cu ft Class IG1
TUBING RECORD
SIZE DEPTH SET (MD)
5-1/2", 17#, L-80 91101 - 9668'
4-1/2", 12.6#, L-80 9668' - 9785'
ACID, FRACTURE, CEMENT' SQUEEZE, ETC.
HOLE
SIZE
36"
17-1/2"
12-1/4"
8-112"
3-3/4"
TVD
25.
DEPTH INTERVAL (MD)
9402'
8962'
89521
1 b. Well Class:
IBI Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
201-224 305-118
13. API Number
50- 029-20969-02-00
14. Well Name and Number:
PBU J-17B
15. Field 1 Pool(s):
Prudhoe Bay Field 1 Prudhoe Bay
poor
Ft
Ft
16. Property Designation:
ADL 028281
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
AMOUNT
PULLED
PACKER SET (MD)
9668'
AMOUNT & KIND OF MATERIAL USED
P&A w/12 Bbls Class 'GI
Set EZSV
Set Whipstock
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
OIL-BBL
PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED + OIL-BBL
Press. 24-HoUR RATE
GAs-McF
W ATER-BBL
CHOKE SIZE
GAS-OIL RATIO
GAs-McF
W ATER-BBL
OIL GRAVITY-API (CORR)
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
RBDMS BFL \~uV 16 2005
Form 10-407 Revised 12/2003 ().
: r ¡ ¢çmfINUED ON REVERSE SIDE
28.
)
29.
)
FORMATION TESTS
GEOLOGIC MARKERS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River
10058'
84361
None
Shublik
101081
84741
Sadlerochit
10215'
8565'
TCGL
BCGL
10390'
8721'
10471'
87881
25N
10580'
8865'
25P
105971
8875'
21N
10761'
89521
21P
10768'
89551
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terne Hubble ~ 1'IfL(q . tkl ~ TrUe Technical Assistant Date II/II ( D5
PBU J-178 201-224 305-118 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Drilling Engineer: Phil Smith, 564-4897
Permit No.1 Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 18: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool Is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state In item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None",
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
) )
Well: J-17C Accept: 09/23/05
Field: Prudhoe Bay Unit Spud: 09/28/05
API: 50-029-20969-03-00 Release: 1 0/11/05
Permit: 205-082 Rig: Nabors 2ES
PRE-RIG WORK
08/31/05
RIH WI 3.60" BELL GUIDE 11-3/8" JDC.
09/01/05
SAT DOWN AT 9690' SLM WI BELL GUIDE I PULLING TOOL. UNABLE TO LATCH IBP. RUN 3.80" CENT I
3.50" LIB. PICTURE OF DEPLOYMENT SLEEVE. APPEARS IBP RELEASED AND FELL INTO LINER TOP. RIG
DOWN FOR E-LlNE GYRO SURVEY, WILL RETURN LATER TO FINISH JOB.
RAN GYRO FROM SURFACE TO 8900' FOR PRE-RIG WORK. DID NOT TAG TO.
09/02105
PULLED 2-118" WFD IBP FROM DEPLOYMENT SLEEVE AT 9685' SLM. (ALL ELEMENTS RECOVERED)
DRIFT WI 1.75" CENT I SB TO DEV AT 10816' SLM. POOH. RDMO.
09/04/05
MIRU. CONDUCT BOP TEST. MU/RIH W/2" BDJSN. CIRC KILL WELL.
09/05/05
FLUID PACK TUBING AND IA - SITP 750. MIX AND PUMP 12 BBLS CLASS 'G' CEMENT AT 15.8 PPG.
OBTAINED 1750 WHP BUMP. CONTAMINATE AND CLEAN TUBING TO 9200'. EST TOC AT 9600'. POH AT
80%. FP WELL RDMO. JOB COMPLETE.
09/06/05
DRIFT TUBING WI 4.50" CENT, S. BAILER. SO AT 9362' SLM, SO AT 9362' SLM W/4.55 CENT, SO AT 9383'
SLM W/3.68 CENT, SO AT 9402' SLM W/2.50 CENT SB, WAS FULL OF WHAT APPEARS TO BE CEMENT.
09/09/05
SHOT 4.4375" GOEX JET CUTTER AT 9110'. GOOD INDICATION OF CUT AT SURFACE.
)
')
BP EXPLORATION
O.perations Summary Report
Page 1_
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-17
J-17B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 9/22/2005
Rig Release: 10/11/2005
Rig Number: 2ES
Spud Date: 1/3/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
9/22/2005 16:00 - 00:00 8.00 MOB P PRE Exception rig move from DS14 to J Pad. Substructure module
on K- Pad road @ 0000 hrs - no problems. Pit module, camp,
and truckshop on DS 14.
9/23/2005 00:00 - 09:30 9.50 MOB P PRE Continue exception rig move with substructure module. Lay
matting boards / move rig fromG pad road to J Pad.
09:30 - 12:00 2.50 MOB P PRE Spot sub on J-17C. Raise Derrick.
12:00 - 17:30 5.50 MOB P PRE Move camp, pits, and shop from OS 14 to J-pad. Raise cattle
chute. RU floor. Bridlel down derrick. RU top drive. Close cellar
door and install second annular valve.
17:30 - 22:00 4.50 MOB P PRE Spot shop, pits, camp, cuttings pit, and out buildings. Berm
cellar, pits, and cuttings tank. RU pits.
22:00 - 22:30 0.50 MOB P PRE RU DSM. Pulled BPV. Tubing / Csg press - 0 psi. Continue
rigging up.
22:30 - 23:30 1.00 MOB P PRE Test gas alarms, take on water, adjust suction valves in pits,
RU circ lines. Accept rig @ 2330 hrs 9-23-05.
23:30 - 00:00 0.50 KILL P DECaMP Pre spud meeting with crew, tool pusher, OS leader, mud
enginner.
9/24/2005 00:00 - 03:00 3.00 KILL P DECaMP Test lines to 1,000 psi. Tubing / Csg press 0 psi. Rev circ 50
bbls diesel out tubing. Pump down tubing - circ out 100 bbls
diesel out csg. Pump soap pill and circ hole with clean 8.4 ppg
sea water - 9 BPM @ 1,100 psi. Observe well - static. RD circ
lines.
03:00 - 04:00 1.00 WHSUR P DECOMP Dry rod TWCV. Test from below to 1,000 psi.
04:00 - 08:00 4.00 WHSUR P DECOMP ND Tree and adaptor flange. Clean up hanger and inspect
hanger threads. Break down tree and remove from cellar.
08:00 - 10:30 2.50 BOPSUP P DECOMP NU BOP's. Install mouse hole.
10:30 - 18:30 8.00 BOPSUP P DECOMP Fill stack. Rig up to test. Repair test pump. Test BOPE to 250
psi low and 3,500 psi high as per BP policy.Test witness
waived by Chuck Scheve w/ AOGCC. Test witnessed by Bill
Decker - Wellsite leader, and Charlie Henley - Tool pusher. RD
test equip / blow down.
18:30 - 19:30 1.00 WHSUR P DECOMP RU DSM lubricator / extension. Pulled TWCV.
19:30 - 20:30 1.00 PULL P DECOMP M.U. landing joint. Back out lock down screws. RU handling
tools for 5.5" tubing. PJSM.
20:30 - 21 :30 1.00 PULL P DECOMP Pull tbg hanger to rig floor. No over pull. String wt. 180K.
Monitor well - stable. L.D. hanger and landing joint.
21 :30 - 22:00 0.50 PULL P DECOMP RU spooling unit.
22:00 - 00:00 2.00 PULL P DECOMP POOH L.D. 34 jts 5 1/2" tubing and spooling up control line.
9/25/2005 00:00 - 01 :30 1.50 PULL P DECOMP POOH laying down 51/2" tubing and spooling control line. LD
SSSV. RD spooling unit. Clean and clear floor. Rec 26 clamps
and 4 ss bands.
01 :30 - 09:30 8.00 PULL P DECOMP POOH laying down 51/2" tubing and GLM's. Recovered total
209 jts and cut off piece ( 19.70'), 11 GLM's, SSSV. Hang
tongs and change elevators. Clear floor.
09:30 - 12:00 2.50 BOPSUP P DECOMP MU 4" test joint. Install test plug. Test upper and lower rams,
annular, and floor valves to 250 psi low and 3,500 psi high.
Test witnessed by Charlie Henley -tool pusher and Bill Decker-
OS leader. RD test equip. Install wear ring.
12:00 - 22:00 10.00 CLEAN P DECOMP PJSM. RU SWS. Ran 8.5" Gauge ringl JB/ CCU GR. Tagged
up @ 9,110'. Ran GR/ CCL correlation log. POOH. Junk
basket full of contolline plastic coating. Made 3 more runs w/
GR I JB. No recovery in JB on last run to 9,050'.
22:00 - 00:00 2.00 DHB P DECOMP MU 95/8" EZSV plug wI GR / CCL. RIH and spot plug @
Printed: 10/14/2005 3:56:51 PM
')
)
BPEXPLORATION
Operations. Summary Report
Page 2 _
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-17
J-17B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 9/22/2005
Rig Release: 10/11/2005
Rig Number: 2ES
Spud Date: 1/3/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
9/25/2005 22:00 - 00:00 2.00 DHB P DECOMP 8,962'. Setting tool would not fire.
9/26/2005 00:00 - 00:30 0.50 DHB N DFAL DECOMP Attempt to set 9 5/8" EZSV plug @ 8,962'. Unable to fire
ignitor.
00:30 - 01 :30 1.00 DHB N DFAL DECOMP POOH wI wire line and 9 5/8" EZSV plug.
01 :30 - 03:00 1.50 DHB N DFAL DECOMP L.D. EZSV plug and setting tool. Rehead line. Change out CCL
and ignitor. Check out tools at surface. MU setting tool and
EZSV plug.
03:00 - 04:00 1.00 DHB N DFAL DECOMP RIH w/9 5/8" EZSV plug and CCL. Set EZSV plug @ 8,962'.
04:00 - 05:00 1.00 DHB P DECOMP POOH with W.L. and setting tool. UD same.
05:00 . 06:00 1.00 CASE P DECOMP R/U & test 95/8" Casing to 3500 psi. Chart test for 30 minutes.
Bleed pressure & rig down test equip. Test witnessed by Mike
Whiteley - BP WSL.
06:00 . 13:00 7.00 EVAL P DECOMP SWS ran USIT log from 8,932' to surface. Log showed max
20% metal loss perdominately in high dogleg interval f/7,800' -
7,950. RD SWS.
13:00· 14:00 1.00 STWHIP P WEXIT PJSM. RU handling tools. Prep W.S. BHA.
14:00 - 18:30 4.50 STWHIP P WEXIT MU whipstock 18 1/2" window milling BHA. Orient. Upload
MWD. Surface test tools. PU DC's and HWDP. Change out
handling tools.
18:30 . 19:00 0.50 STWHIP N RREP WEXIT Work on iron roughneck.
19:00 - 00:00 5.00 STWHIP P WEXIT RIH wI whipstock I window mills picking up 140 jts 4" DP to
5,239'. ( make up DP wI spinning chain).
9/27/2005 00:00 . 04:00 4.00 STWHIP P WEXIT RIH wI whipstock & window mills picking up 4" DP to 8,910'. Fill
pipe @ 2000' intervals.
04:00 . 04:30 0.50 STWHIP P WEXIT Lubricate rig. Service top drive. Connect blower hose.
04:30 - 05:00 0.50 STWHIP P WEXIT Orient whipstock 76 deg LHS - 500 gpm - 2200 psi. Up 21 OK,
DN 155K. Tagged plug @ 8,952' . sheared and set BT anchor
wI 22k down. Pull 10K over on anchor 2X. Sheared off
whipstock wI 39k down. Mill hung up - pulled 25K over wI 8K
torque and mill came free.
05:00 . 06:00 1.00 STWHIP P WEXIT Displace well to 11.2 ppg LSND mud· pumped 50 bbl high vis
spacer, 600 bbls 11.2 ppg mud· 500 gpm - 2200 psi. Torque =
7/8K off bottom. Rotate and reciprocate.
06:00 - 13:00 7.00 STWHIP P WEXIT Mill window in 9 5/8" casing from 8931' to 8947'. Drill 20' of new
hole to 8959'. Pump @ 400 gpm @ 1940 psi. Torque while
milling = 11 K. WOB = 5K, RPM = 105. Recovered 50 pounds
metal cuttings.
13:00 - 16:00 3.00 STWHIP P WEXIT Circ super sweep around, small amount of metal back. Pump
super sweep # 2 @ 500 gpm @ 2400 psi. Work mills through
window. Rack back 1 stand DP.
16:00 - 17:00 1.00 STWHIP P WEXIT Slip and cut 112' of drill line. Service crown, inspect dwks.
17:00 - 18:00 1.00 STWHIP P WEXIT Service top drive.
18:00 . 18:30 0.50 STWHIP P WEXIT Perform F.I.T. to 12.4 EMW @ 475 psi. TVD = 7551'. Pressure
up to 510 psi, pressure dropped slowly and stabalized @ 475
psi. Pumped 1.4 bbl @ .5 bpm.
18:30 - 22:00 3.50 STWHIP P WEXIT Pump dry job, blow down surface equip. POH for drilling BHA.
22:00 - 00:00 2.00 STWHIP P WEXIT POH with BHA from 1018', UD drill collars and mills. Clear rig
floor.
9/28/2005 00:00 . 01 :30 1.50 STWHIP P WEXIT Change elevators, pull wear ring. P/U Johnny Wacker & flush
BOP stack, function rams. Blow down kill line, choke line and
top drive.
01 :30 - 05:00 3.50 STWHIP P WEXIT P/U BHA. MIU Hughes HCM605 bit & 1.5 degree mud motor
and MWD, orient. Upload MWD, P/U flex collars, jars & HWDP.
Printed: 10/14/2005 3:56:51 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
)
-i)
Page 3 _
BP EXPLORATION
Operations Summary Report
J-17
J-17B
REENTER+COMPLETE
NABORS ALASKA DRILLING I
NABORS 2ES
Start: 9/22/2005
Rig Release: 10/11/2005
Rig Number: 2ES
Spud Date: 1/3/2002
End:
9128/2005
05:00 - 08:30
From - To Hours Task Code NPT Phase
Description of Operations
08:30 - 10:30
10:30 - 00:00
9/29/2005
00:00 - 17:00
17:00 - 18:30
18:30 - 19:30
19:30 - 20:00
20:00 - 20:30
20:30 - 22:30
22:30 - 23:30
23:30 - 00:00
9/30/2005
00:00 - 03:30
03:30 - 07:30
07:30 - 08:30
08:30 - 11 :00
11 :00 - 11 :30
11 :30 - 12:00
12:00 - 16:30
16:30 - 17:00
17:00 - 18:00
18:00 - 18:30
18:30 - 19:00
3.50 STWHIP P
2.00 STWHIP P
13.50 DRILL P
17.00 DRILL P
1.50 DRILL P
1.00 DRILL P
0.50 DRILL P
0.50 DRILL P
2.00 DRILL P
1.00 DRILL P
0.50 DRILL P
3.50 DRILL P
4.00 DRILL P
1.00 CASE P
2.50 CASE P
0.50 CASE P
0.50 CASE P
4.50 CASE
P
P
P
1.50 CEMT P
WEXIT RIH P/U drill pipe from 812' to 5108'. Fill pipe @ 2700'
intervals.
WEXIT RIH with stands from 5108' to 8838', RIH @ 90 fpm. Fill pipe @
2800' intervals. Install top drive blower hose. Orient BHA to
pass through window. Take SPRs. Tag bottom @ 8959'.
INT1 Drill from 8959' to 9470'. UWT = 180K, DWT = 140K, RWT =
160K. Torque off bottom = 7K, on = 8K @ 70 rpm. WOB =
11 K. Pump @ 480 gpm @ 2830/3100 psi. ART = 3.61, AS =
4.49 hrs. TVD = 7936'.
INT1 Drill ahead from 9470' to casing point TO @ 10234'. ST total
= 6.37, ART total = 11.65 hrs. HWT = 190K, OW - 140K,
RWT = 160K. Torque off bottom = 7K, on = 10 @ 70 rpm.
WOB = 11 K. Pump @ 485 gpm @ 3250/3 0 psi.
INT1 Pump high vis sweep @ 480 gpm @ 33 psi. Rotate &
reciprocate.
INT1 Monitor well. Short trip, POH from 234' to window in 9 5/8"
casing @ 8931'. Limit pulling s ed to 60 fpm.
INT1 Service top drive.
INT1 RIH from 8931' to bottom
running speed to 60 fR
INT1 Pump high vis swe . Spot liner running pill and pump dry job.
INT1 POH from botto @ 10234' to 8960'. Limit pulling speed to 60
fpm.
INT1 MAD pass om 8960' to 8830' @ 300 fph. Drop drill pipe drift
@ wind
INT1 POH om 8830' to 812'.
INT1 LI BHA, Retreive drill pipe drift. Flush MWD tools, down load
WD, LID 20 HWDP, jars, 3 flex collars, MWD, bit & motor.
R/U 7" casing equipment, PJSM.
M/U 7" float equip, check floats are holding. RIH with 7" 26#
L-80 BTC-M liner to 1436'.
M/U liner hanger, change out handling equip. M/U 1 stand of
drill pipe.
LNR1 Circ liner volume @ 3 bpm @ 160 psi. Clear rig floor. HWT =
65K, DWT = 60K.
LNR1 RIH with liner on 4" drill pipe from 1566' to 8909'. Running
speed = 90 fpm. Fill pipe @ 930' intervals.
LNR1 LID single of drill pipe, circ 1.5 times liner and drill pipe volume
@ 7 bpm @ 1060 psi. HWT = 180K, DWT = 125K.
LNR1 RIH from 8909' to 10202' @ 60 fpm.
LNR1 M/U cement head and joint of drill pipe. break circ and tag
bottom @ 10234'.
LNR1 Circ, stage pump up to 6 bpm @ 1330 psi. PJSM with drill
crew, cementers, Baker tools Rep. & WSL.
LNR1 Line up cementers, pump 3 bbl water & pressure test lines to
4500 psi. Pump 30 bbl of 12.2 ppg MudPush spacer followed
by 62 bbls (324 sx) of 15.8 ppg class "G" cement @ 5 bpm.
Drop plug, displace with mud @ 6 bpm. Observe liner wiper
latch up, bump plug with 4000 psi & set liner hanger. Slack off
50K to confirm hanger is set. Bleed off pressure. Rotate 15
turns to the right to release from hanger. Pressure up to 1000
psi and unsting from liner. Pump 30 bbl @ 12 bpm to circ
cement off liner top. P/U to expose dog sub, slack off 70K to
Printed: 10/14/2005 3:56:51 PM
,~;.~~¡
II, ;\<\.,.ï
"\,\'::'
n]¡\
~ 2#7
,',"'7.:;;1
'UJ
:, ~"':J
',' [, '
i :
" ,;:;¡
)
1("'-"1''']' )"r¡,r;;;.;:J
I:, : : i L~
:1 I ' , , ".,,,"
~\~; :..3
)
FRANK H. MURKOWSKI, GOVERNOR
A.I~A.SKA OIL AND GAS
CONSERVATION COMMISSION
333 W. pH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
~~:)!'С'I''''' dl~~
C){ I,
Bill Isaacson
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re:
Prudhoe Bay J -1 7B
Sundry Number: 305-118
SCANNED JUN 1 4 2005
Dear Mr. Isaacson:
Enclosed is the approved Application for Sundry Approval relating to the above \
referenced well. Please note the conditions of approval set out in the enclosed form.
Please provide at least twenty-four (24) hours notice for a representative of the
Commission to witness any required test. Contact the Commission's petroleum field
l·Jlsoø~t()r 0"')+ (0{1'7\ ¿;:,o '1¿:;:()'Ï ("""'1"1"<3"'\
. J. \-'_'__'4 ""'L \./V I) V..I./ Jvv, \.P.....6....).
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such
further time as the Commission grants for good cause shown, a person affected by it may
file with the Commission an application for rehearing. A request for rehearing is
considered timely if it is received by 4:30 PM on the 23rd day following the date of this
letter, or the next working day if the 23rd day falls on a holiday or weekend. A person
may not appeal a Commission decision to Superior Co unless rehearing has been
requested.
~
DATED this11:d'ay of May, 2005
Enc!.
c;..p;,.ç~~ ~ WG/.\- ~ /2.7/Li."I05
) STATE OF ALASKA 07:5 5/ ¿ ? 15'
ALASKA OIL AND GAS CONSERVATION COMMISSION .DECEIVE
APPLICATION FOR SUNDRY APPROV,,~ _6 D
20 AAC 25.280 MAY 1 0 2005
1. Type of Request:
B Abandon / 0 Repair Well 0 Plug Perforations 0 Stimulate
o Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver
o Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well
Alaska Oil & Gøs Cons. Commission
o Other Anchorage
o Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
4. Current Well Class:
III Development D Exploratory
D Stratigraphic D Service
5. Permit To Drill Number
201-224 /'
6. API Number: /'
50- 029-20969-02-00
99519-6612
77'
9. Well Name and Number:
PBU J-17B ,./
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (ft): I Effective Depth TVD (ft): Plugs (measured):
11664 8998 9668
Size MD TVD Burst
Junk (measured):
None
Collapse
8. Property Designation:
ADL 028281
11.
Total Depth MD (ft):
11731
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Total Depth TVD (ft):
8999
Length
Liner
Liner
110' 20" x 30" 110' 110'
2685' 13-3/8" 2685' 2685' 4930 2670
9963' 9-5/8" 9963' 8364' 6870 4760
311' 7" 9713' - 10024' 8172' - 8410' 7240 5410
336' 3-1/2" 9732' - 10068' 8187' - 8443' 10160 10530
2024' 2-3/8" 9707' - 11731' 8167' - 8999'
Perforation Depth MD (ft): Perforation Depth TVD (ft):
11300' - 11650' 8996' - 8999'
Packers and SSSV Type: 9-5/8" Baker '3H' packer;
5-1/2" Cameo SSSV Nipple
Tubing Size:
5-1/2" 17# x 4-1/2" 12.6#
Tubing Grade:
L-80
Packers and SSSV MD (ft): 9668'
2114'
Tubing MD (ft):
9785'
12. Attachments:
III Description Summary of Proposal
D Detailed Operations Program
14. Estimated Date for
Commencing Operations:
D BOP Sketch
13. Well Class after proposed work:
D Exploratory III Development D Service
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name BiIIlsaacson Title Senior Drilling Engineer
Signature t).k t _ ..~ Phone 564-5521 Date S / q/ 05
Commission Use Only
/'
May 13, 2005
Date:
15. Well Status after proposed work:
DOil DGas
D WAG D GINJ
D Plugged
DWINJ
III Abandoned
D WDSPL
Contact Phil Smith, 564-4897
Prepared By Name/Number:
Terrie Hubble, 564-4628
Conditions of approval: Notify Commission so that a representative may witness
I Sundry Number: 3oS:--/ I Ý
o Plug Integrity
o BOP Test
o Mechanical Integrity Test
o Location Clearance
Other: Te s +- I~ () V E
, SS-OO ~ç,,¿
RBDMS 8Fl ,¡UN 0 6 2005
'1,
ORIGlr·r ¡(!, !
J' ¡ \~;:~~~PROVED BY
COMMISSIONER'" t~OMMISSION
Date ~~£:e
~
)
)
GE~·····.·.·
.', ,¡ '~f~
. ", ~~iI 4
To:
Winton Aubert - AOGCC
Date: May 9, 2005
From:
Phil Smith - BPXA GPB Rotary Drilling
Subject:
Reference:
J-17B Application for Sundry Approval - P&A for Sidetrack Operations
API # 50-029-20969-01
Approval is requested for the proposed P&A of PBU well J-17B. The tubing suffers extensive line
corrosion; conventional patching is not expected to have a high chance of success. In its current location, /"
the remaining reserves cannot justify the expense of a workover. A horizontal sidetrack to the base of
Zone 2A is seen as the best way to maximize value from the wellbore.
The sidetrack is currently scheduled for Nabors rig 2ES, beginning around June 1, 2005. This well,
however, may move up on the schedule depending on the Kuparuk bridge schedule. The pre-rig work for
this sidetrack will begin at the Well's Group earliest convenience after sundry approval.
Current Condition:
,¡' IBP set in packer bore at 9966' 7/29/04.
,¡' CMIT x IA failed at 0.26 bpm @ 2500 psi 8/1/04
,¡' Cycled LOS on Tubing spool: Two frozen, one left backed out. Tested tubing hanger to 5000 PSI.
Test on 9-5/8 IC hanger cycle all LOS on casing spool, all LOS okay. Purged old packing from Y seal and re- /
energized YB seal and test to 3500 PSI. 4/15/05
Scope
Pre-RiQ Work:
1. Run Gyrodata survey from planned KOP at 8900' to surface.
2. R/U slick-line. Pull the IBP from the packer at 9966'.
3. Dri~t the 2 3/8" liner to as deep as possible ~Inclin~tion > ?OO @ 19;8QO').. .
4. Fluid pack the well as necessary. RIH with cOiled tubing a~,."," P&A the 2 ~, '--liner by bullheadlng
cement from 9600' MD to PBTD at 11,663'. Cement volume 7.6)5'bls liner éJ1SblS 5 Y2" tubing. /
5. R/U E-line. RIH with chemical cutter and severe the 5 Y2" tubi .' n the center(~a -full joint of tubing at
....9,100' md. /"
6. Displace the well to clean seawater by circulating down the tubing through the tubing cut. Continue to
circulate until clean seawater returns to surface. Freeze protect to ....2,100· MD with diesel.
7. Combo pressure test the tubing I casing to 3500 psi fl 30 minutes. /i
8. Bleed casing and annulus pressures to zero.
9. Cycle the tubing hanger LDS and test the 9 5/8" mandrel packoff to 5000 psi. /
10. Set a BPV and test to 1000 psi from tubing annulus. Secure the well. Level the pad as necessary.
RiQ Operations:
1. MI I RU Nabors rig 2ES /
2. Circulate out diesel freeze protection and displace the well to seawater. Set BPV/TWC.
3. Nipple down tree. Nipple up and test BOPE to 3,500psi. Pull BPV/TWC. /
4. R/U. Pull 5 Y2" tubing from the cut at ....9,100' MD and above.
5. RIH w/8 Y2" gauge ring I junk basket to top of tubing stub.
6. RIH with HES EZSV and set bridge plug as required to avoid cutting casing collar and place top of
whip stock at ....8900.
7. Pressure-test the 9 5/8" casing to 3,500psi for 30 minutes. Record test.
J-17B Application for Sundry
)
)
t ,8. Run USIT in 9 5/8" casing from CIBP to surface. POOH. RID E-line.
" a. Pick-up RTTS and isolate leak if necessary
A 9. P/U and RIH with 9 5/8" Baker bottom-trip anchor whip stock assembly. Orient whip stock, as desired,
~ ~ i~"'"\°3 and set on bridge plug. Shear off of whip stock.
fto\lt....l . 10. Displace the well to 11.2 ppg LSND based milling fluid. Completely displace the well prior to beginning
milling operations.
11. Mill window in 9 5/8" casing at ± 8,900' MD, plus approximately 20' beyond middle of window.
Circulate well bore clean.
12. Pull up into 9 5/8" casing and conduct an FIT to 12.5 ppg EMW. POOH.
13. M/U 8 Y2" Dir/GR/Res assembly. RIH, kick off and drill the 8 1/2" intermediate section to the top of the
Sag River, per directional proposal. Circulate well clean, short trip to window. POOH.
14. Run and cement a 7", 26.0#, L-80 intermediate drilling liner.
15. Run and cement a 7" liner tieback from TOL at 100' below the surface casing shoe. /
16. Test the 9 5/8" casing X 7" liner to 3,500psi for 30 minutes. Record the test.
17. M/U 6 1/8" Dir/GR/Res/ABI assembly. RIH to the landing collar.
18. Drill out the 7" liner float equipment and cement to the shoe.
19. Displace the well to 8.4 ppg Flo-Pro drilling fluid.
20. Drill out the 7" shoe plus drill -20' new formation; pull up into the shoe and conduct an FIT to 10.0 ppg
EMW. Drill ahead to horizontal landing point. POOH for bit I BHA change. PU Neu/Den.
21. RIH, drill horizontal section to planned TD, short trip as necessary.
22. Circulate, short trip, spot liner running pill, POOH.
23. Run and cement a 4 Y2", 12.6#, L-80 solid production liner. POOH UD all drill pipe.
24. RIH with 2 7/8" perf guns and perforate ±500'.
25. R/U and run 4 1/2",12.6#, 13Cr-80 completion tubing. Land the tubing RILDS.
26. Set a TWC and test to 1000 psi
27. Nipple down the BOPE. Nipple up the tree and test to 5,000psi.
28. Reverse circulate inhibited seawater to the packer depth. Set packer and individually test the tubing
and annulus to 3,500psi 30 minutes. Record each test.
29. Shear the DCK valve and freeze protect the well to -2,100'. Secure the well.
30. Rig down and move off. .
Post-RiQ Work:
1. Install well house and instrumentation
2. MI I RU slick-line. Pull the ball and rod I RHC plug from landing nipple below the production packer.
Install gas lift valves.
3. POP well to test unit until cleaned up.
Estimated Pre-rig Start Date: 05/13/2005
Estimated Spud Date: 06/01/2005
Phil Smith
Operations Drilling Engineer
564-4897
J-178 Application for Sundry
TIiEE =
WELLHEAD =
ACTUA TOR =
KB. ELEV =
BF. ELEV =
KOP ~~
Max Angle =
Datum MD =
DatumTVD=
6" McEVOY ')
McEVOY ~
OTIS
77.0'
39.78'
3000'
94 @ 11009'
10830'
8900' SS
9-5/8" DV PKR 1-1 2584'
13-3/8" CSG, 72#,10 = 12.347" 1-1 2685'
Minimum ID = 1.92" @ 9715'
TOP OF 2-3/8" LINER (STL)
15-1/2" TBG, 17#, L-80, .0232 bpf, 10 = 4.892" 1-1
9644'
13.70" BKR DEPLOYMENT SLV, 10 = 3.00" 1-1
12-5/8" x 2-318" XO, 10 = 1.92" 1-1
9707' 1
9715' 1
9732' 'I
13.70" BKR DEPLOY SLV, 10 = 3,00" (BEHIND LNR) 1-1
14-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958" 1-1
9784'
1
~
tAFETY NOTES: WElL ANGLE> 70° @ 10800'
AND 90° @ 10950'
1-1 5-1/2" CAMCO SSSVN, 10 = 4.562" 1
GAS LIFT MANDRELS
DEV TYPE VLV LATCH
12 OTIS LBO DMY RM
43 OTIS LBO DMY RM
45 OTIS LBO DMY RA
44 OTIS LBO DMY RA
43 OTIS LBO DMY RA
40 OTIS LBO DMY RA
35 OTIS LBO DMY RA
34 OTIS LBO DMY RA
34 OTIS LBO DMY RA
38 OTIS LBO DMY RA
38 OTIS LBO DMY RA
38 OTIS LBO DMY RA
38 OTIS LBO DMY RA
J-17B
e
2114'
-
-
ST MD TVD
13 3149 3067
12 5074 4610
~ 11 6476 5603
10 7171 6094
9 7322 6204
8 7806 6564
7 7962 6689
6 8276 6947
5 8434 7077
4 8751 7332
3 8907 7453
2 9353 7805
1 9509 7931
-
-
L
PORT DATE
o 07/11/04
o 07/11/04
o
o
o
o
o
o
o
o
o
o
o
I I I 9582' 1-1 5-1/2" BKR L SLIDING SLV, 10 = 4.313"
~ 9644' 1-1 BOT SBR WI 3.813" X PROFILE 1
~~ 9668' 1- SET WFD IBP 07/29/04 ----
WI FISH NECK, 00 = 1.0" @ 9966'
9668' 1-1 9-5/8" BOT 3H PKR, 10 = 3.958" 1
~ r , J I
Ji' ]]ill 1 9713' 1-1 7" BOT LNR HGR TIEBACK SLEEVE
~ I 9716' 1-1 4-1/2" OTIS X NIP, 10 = 3.813" 1
j I 9752' 1-1 4-1/2" OTIS XN NIP, 10 = 3.80" 1
I 9785' 1-1 4-1/2" WLEG 1
19-5/8" CSG, 47#, L-80, 10 = 8.671" 1-1 9963' ~
TOP OF 7" BAKER WHIPSTOCK 1-1 10021'
TOPOFOLD2-7/8"CUTLNR 1-1 10058'
PERFORA TION SUMMARY
REF LOG: SWS MCNL/GR ON 1/20/02
ANGLE AT TOP PERF: 90 @ 11300'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
1.56" 4 11300 - 11650 0 01/20102
7" LNR, 26#, L-80, BTRS, 10 = 6.276" 1-1 11040'
~
7" LNRMILLOUTWINDOW (J-17B)
10023' - 10031' *RA TAG @ 10031'
3-1/2" LNR, 9.2#, L-80, 10 = 2.992" 1
~
x
x
X
I ,¡¡
.-
I
2-7/8" LNR (J-17A) NOT
SHOWN. CIBP SET @
10100' ON 12/12/01.
~ 2-3/8" LNR, 4.7#, L-80, .0039 bpf, 10 = 1.92" 1-1 11731'
DA TE REV BY COMMENTS DA TE REV BY COMMENTS
07/18/83 INITIAL COMPLETION 07/29/04 MDC/TLP IBPWJTH FISH NECK
10/26/99 JLH CTD SIDETRACK (J-17A)
01/21/02 CTD SIDETRACK (J-17B)
02/03/02 CI-VTP CORRECTIONS
07/15/03 CMO/TLP KB ELEVATION CORRECTION
07/11/04 RWL/KAK CIO GLV
11663' I
PRUDHOE BA Y UNIT
WELL: J-17B
PERMIT No: 2012240
API No: 50-029-20969-02
SEC 9, T11N, R13E, 801' SNL & 1806' WEL
BP Exploration (Alaska)
IDEE=" 1
WELLHEAD =
ACTUATOR =
KB. ELEV =
BF. ELEV = ~
KOP~.
Max Angle =
Datum MD =
DatumlVD =
6" McEVOY
McEVOY
OTIS
77.0'
39.78'
3000'
. -}
) J-17C Proposed I SAFETY NOTES:
8900' SS
2100' l-i 4-1/2" X Nipple, ID = 3.813"
9-5/8" DV PKR l-i
13-3/8" CSG, 72#, ID = 12.347" l-i
2584'
2685'
2800'
-
-
-
I Top 7" Liner Tieback
l-i
~
Minimum ID = 3.725 @
XN Nipple
ST MD TVD
4
3
2
1
GAS LIFT MANDRELS
DEV TYÆ VLV LATCH PORT DATE
DCK
DMY
DMY
DMY
L
18750' - Top of Liner 1
14-1/2" TBG, 12.6#, 13Cr-80, ID = 3.958"
l-i 10,100' I
8900' l-i 9 5/8" Window 1
19-5/8" CSG, 47#, L-80, ID = 8.671" l-i 9963' r--.
Top Cement (J-17B Abandonment) 1-1 -10,000 1../
I 10,040' 1-i41/2"XNipple(3.813"ID) 1
1 10,050' I-iT' x 41/2" Baker S3 Packer 1
I 10,070' 1-i4 1/2" X Nipple (3.813" ID) 1
1 10,090' 1-i4 1/2" XN Nipple (3.725" ID) 1
10,100' - 4 1/2" Hanger / liner top packer
10100' - 4 1/2" WLEG
1 10,250' l-i 7" 26# L-80 (6.276" ID)
-:::::::::>
J -.,-----:-c,
~~....::".~......."'-
....".,.._, ~.,..,.,
" _.~---- .
1
j
14 1/2" 12.6# L-80 Liner PBTD l-i 12,280'
141/2" 12.6# (3.958" ID) 0.0152 bpf l-i 12,361'
.J
~
..
7" LNR MILLOUT WINDOW (J-17B)
10023' - 10031' *RA TAG @ 10031'
I 10068' l-i 3-1/2" LNR, 9.2#, L-80, ID = 2.992" I
ÆRFORA TION SUMMARY
REF LOG: SWS MCNL/GR ON 1/20/02
ANGLE AT TOP ÆRF: 90 @ 11300'
Note: Refer to Production DB for historical perf data
SIZ E SPF INTERV A L Opn/Sqz DA TE
1.56" 4 11300 - 11650 S 01/20/02
7" LNR, 26#, L-80, BTRS, ID = 6.276" l-i 11040'
2-3/8" LNR, 4.7#, L-80, .0039 bpf, ID = 1.92" l-i 11731'
DA TE REV BY COMMENTS
07/18/83 INITIAL COM PLETION
10/26/99 JLH CTD SIDETRACK (J-17A)
01/21/02 CTD SIDETRACK (J-17B)
02/03/02 CH/TP CORRECTIONS
07/15/03 CMO/TLP KB ELEVATION CORRECTION
07/11/04 RWL/KAK C/O GLV
DATE REV BY COMMENTS
07/29/04 MDC/TLP IBPWITH FISH NECK
04/18/05 PGS Proposed Sidetrack
PRUDHOE BA Y UNrr
WELL: J-17C
ÆRMrr No: "'2012240
API No: 50-029-20969-02
SEC 9, T11 N, R13E, 801' SNL & 1806' WEL
BP Exploration (Alaska)
Sundry Approvals for 18-12A and J-17B
)
)
Subject: Sundry Approvals for 18-12Aand J-17B
From: "Senden, Leslie B" <SendenLB@BP.com> ~O\,""ð.~Lf
Date: Fri, 27 May 2005 10:41 :14 -0800
To:·.·.Cathy.·Foerst~r .<cathy_foerster@admin.state.ak.us>
Cç:Jan¢__\Vil1iatfison@aclmin.state.ak.us,"Verseput, Tiro" <VersepT@BP .com>,.·. "Pospisil, Gordon"
<PQspisO@:B~;C()J)1:> .
Cathy
As we discussed on the phone today, I would like to provide a little additional background associated
with 18-12A and J-17B to facilitate AOGCC approval of the sundry applications. 18-12A has not been
cycled in more than three years and the last time it was brought online (after a 9 month shut-in) in 2001,
it tested at over 50,000 GOR. Based on this, we see no resource potential remaining in the current
location.
The decline curve analyses done by the AOGCC for these wells appeared to be based on SLP rather
than a forecast of incremental black oil. For GD wells at or near the marginal GOR of the facility, it is
important to subtract condensate and VBLs from the forecast because they will be produced anyway
from whatever well is brought into the facility in lieu of the well in question. Also, it is appropriate to
subtract a "gas backout" to account for the oil that would be produced by the next well in the stack.
These factors give us a remaining incremental black oil recovery that is substantially lower than the
AOGCC estimate.
Noting the difference between our coil and rotary sundry packages, we will begin providing the same
type of information for coil sidetracks as we do for rotary. Hopefully this will give you the information you
need to approve the sundries.
Thanks for taking the time to talk this through today!
--Leslie
1 of 1
5/27/2005 10:51 AM
;A ~ h~ ^ (JrJ1
DATA SUBMITTAL COMPLIANCE REPORT
1/26/2004
Permit to Drill 2012240
Well Name/No. PRUDHOE BAY UNIT J-17B
Operator BP EXPLORATION (ALASKA) INC
A~~~-O~-~O~~~ ~
Completion Status -~:_---- ~",ren~~tat",,__1-01~_____- ___8_- -------
Completion Date 1/20/2002 /'"
-------~..
MD 11731 -- lVD 8999,/
---------~----~------~---'------~----'--'-'------'-
-----'---'~._--------'--'_.~----
REQUIRED INFORMATION
--_._---~-
------~------
DATA INFORMATION
C Asc
C Pdf
C Pdf
Directional Survey Q
Mud Log No
Samples No
-'---------------
-----_._------~--_.__._,-.._,.,_._~----'-
(data taken from Logs Portion of Master Well Data Maint)
OH/
CH Received Comments
'---~---------_.,--
Open 6/17/2002 PB1
Case 9/27/2002
Well Cores/Samples Information:
Name
41$Vêfifié~tíOn ..
USVèrifiéàfiÓh.. .
. .,:" <," '," .
Log Log Run
Scale Media No
1
Interval
Start Stop
10013 11616
10011 10510
10011 10510
10660 11731
Types Electric or Other Logs Run:
Well Log Information:
Electr
Dataset
Number
H'Õ933
vrfÔ80
.~Iß;\l~rjfiþatjPO ..
~mm~.~~ÝMP
LI$'V~dfj~atioh..
LIS.\ìèr¡f¡çätibn. ..
(
25 BM
Case 9/27/2002
Open 6/17/2002 Wellbore Profile
10013 11616 Open 6/17/2002
10660 11731 Open 6/17/2002
25 BM 1 0660 11731 Open 6/17/2002
9486 11661 Case 3/5/2002
25 BM 10660 11731 Open 6/17/2002
10660 11731 Open 6/17/2002
25 BM 1 10660 11731 Open 6/17/2002
1-10 10011 1 0534 Open 6/212003
25 Final 10041 10534 Open 6/2/2003
25 Final 10041 8760 Open 6/2/2003
PB1
Wellbore Profile
PB1
PB1
PB1
MWD-ROP, DGR-MD - PB1
MWD-DGR-lVD - PB1
(
ç
t...10626
---~-------~_.._------------------_.._----------"------------------------------.----------
Name
Cffi934
~~1i)m~~~y,'~VJf
.J2D00 Þls..y~ij,fiCåtí~~ ..... ....
--t2000RátebfRønßtratiôq. ,
. '" . .
-...!2000@~mm~~~y ..
Interval
Start Stop
Sample
Set
Number Comments
Sent
Received
DATA SUBMITTAL COMPLIANCE REPORT
1/26/2004
Permit to Drill 2012240
Well Name/No. PRUDHOE BAY UNIT J-17B
Operator BP EXPLORATION (ALASKA) INC
MD 11731
lVD 8999
Completion Date 1/20/2002
Completion Status 1-01L
Current Status 1-01L
ADDITIONAL INFORMATION
y/iJ
Daily History Received?
lúN
'()/N
Well Cored?
Chips Received? ""y I N
Formation Tops
Analysis
Received?
~
Comments: -- (J/1 r-- ~ v\ I> D n. 1,
C ru l..... ÀA c> ~ À. ~è) :k l \-~ ~ 1 - C-{ '"'l8 ~ L~ ~ k ~ ~
::::-.:::::::..-=--=-~.:::::::.:.::::=:::::::==========-=====--=- ===t=\===. ----~------ .
Compliance Reviewed By: ._---~-------_.-
Sf'
API No. 50-029-20969-02-00
UIC N
--------
--.-:========:~---=-==--===--=-=:.:::::::::::.====:::::::::
Date:_~.J5 --~ 1_-
- ..-.---
(
(
.(
("
f!)o \ - aé) J-./
) &CXX)
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue~ Suite 100
J\nchorage, Alaska 99501
May 21,2003
RE: MWD Fonnation Evaluation Logs: J-17B PBI,
AK-MW-22003
J-17B PBl:
Digital Log Images
50-029-20969-70
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration ( Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
,::> '~
Signed:.~0\ ~~ I)^ \\,ç(ì'L~
Date:
CE~' ED
~~~.\ ~ (\f\ ~
r~ ~\~
JUN 0 2 2003
". " . :>':, . .... " ...., {""";".!'1!'i';t.~on
A.Jaska Œí ¿~ G¿:i 1VÇ,¡¡~.I,."t;j,.hw .,.;\Ji
l~'chorag$
~
~.
d()I-~~ll
J J D ~¿)
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
J\nchorage,Alaska
September 26, 2002
RE: MWD FOffilation Evaluation Logs J-17B,
AK-MW-22003
1 LDWG fOffilatted Disc with verification listing.
API#: 50-029-20969-02
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
J\nchorage, Alaska 99518
BP Exploration (Aláska) Inc.
Petro-Technical :Oata Center LR2-1
900 E. Benson Blvd.
J\nchorage, Alaska 99508
Signed: ~é, Oo~
Date:
RECE\VED
SEP Z 1 2.00l
At ka Oi~ & Gas Gans., com-ton
f\ltiS Ancbomg~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
(
(
1. Status of Well Classification of Service Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-224
3. Address 8. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 ~ 'P. Wl'tlr 50- 029-20969-02
.~. ~ ü-cA ~1OM.r¡
4. Location of well at surface ,.. ;.V~iÐ 9. Unit or Lease Name
801' SNL, 1806' WEL, SEC. 09, T11N, R13E, UM ~2 S~n. fu Prudhoe Bay Unit
At top of productive interval .~ t~7
2489' SNL, 2433' EWL, SEC. 10, T11N, R13E, UM (..~¿_.,~f $.t,-.. . \10. Well Number
At total depth .' ,..".',.¿-:'. J-17B
2803' SNL, 1578' EWL, SEC. 10, T11N, R13E, UM ,1"",~.\",,,,,,:,Il')'" It. \1 '.'I"'~', .,~ '" '\I,¡r ,'~
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 77' ADL 028281
12. Date Spudded 113. Date T.D. Reached 114. Date Comp., Susp., or Aband. 115. Water depth, if offshore 16. No. of Completions
1/4/2002 1/18/2002 1/20/2002 N/A MSL One
17. Total Depth (MD+1VD) 18. Plug Back Depth (MD+TVD).119. Directional Survey 120. Depth where SSSV se~121. Thickness of Permafrost
11731 8999 FT 11664 8998 FT 181 Yes 0 No (Nipple) 2114' MD 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD ROP, GR, Memory GR, CNL, CCL
23. CASING. LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" X 30" Insulated Conductor Su rface 110' 36" 8 cu vds Concrete
13-3/8" 72# L-80 Su rface 2685' 17-1/2" 3856 cu ft Arcticset III & II
9-5/8" 47# L-80 Surface 9963' 12-1/4" 2360 cu ft IG', 132 cu ft Permafrost
7" 26# L-80 9713' 10024' 8-1/2" 492 cu ft Class 'G'
3-1/2" 9.2# L-80 9732' 10068' 3-3/4" 42 cu ft Class 'G'
2-3/8" 4.43# L-80 9707' 11731' 3" 170 cu ft Class 'G'
24. Perforations open to Production (MD+ TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
1.56" Gun Diameter, 4 spf 5-1/2'" 17#, L-80 9668' 9668'
MD TVD MD TVD 4-1/2", 12.6#, L-80 9785'
11300' - 11650' 8996' - 8999' 26. ACID, FRACTURE, CEMENT SaUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
2000' Freeze Protected with MeOH
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
February 13, 2002 Flowing
Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl CHOKE SIZE 1 GAS-Oil RATIO
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED Oll-BBl GAs-McF WATER-BBL OIL GRAVITy-API (CORR)
Press. 24-HoUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water, Submit core chips.
No core samples were taken.
("'~ r"~ ~ (..\ ~ 1\ 1 :/1 ~ " ~
Form 10-407 Rev. 07-01-80 \j ~ \. ~ (i,,:::'J (I l\ '\Jj l'~\ UI' u 't In Duplicate
RBDMS 8Fl MAR 2 ~ ~O2
(
29. Geologic Markers
Marker Name Measured
Depth
Sag River 10058'
Shublik 10108'
Sadlerochit 10215'
TCGL 103901
BCGL 10471'
25N 105801
25P 10597'
21N 107611
21P 10768'
31. List of Attachments:
(
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
8436'
84741
8565'
87211
87881
88651
88751
8952'
89551
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble Title Technical Assistant
J-17B
Well Number
Date 03..~J-O
201-224
Permit No. / A roval No.
Prepared By Name/Number: Terrie Hubb/e, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 28: If no cores taken, indicate 'none'.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
Form 10-407 Rev. 07-01-80
(
(
BP EXPLORATION
Operations Summary... Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-17
J-17B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start:
Rig Release:
Rig Number:
11/27/2001
Spud Date: 1/3/2002
End:
Hgl.J~§.Æ\c.tiyiWÇpØ~
1/3/2002
3.50 MOB
0.50 MOB
0.50 MOB
0.50 MOB
3.00 BOPSU P
00:00 - 03:30
03:30 - 04:00
04:00 - 04:30
04:30 - 05:00
05:00 - 08:00
08:00 - 13:45
13:45 -16:15
5.75 BOPSU P
2.50 BOPSU P
16:15 - 17:15
17:15 - 18:00
1.00 BOPSU P
0.75 STWHIP P
18:00 -18:15
18: 15 - 19: 15
19:15 - 21:10
0.25 STWHIP P
1.00 STWHIP P
1.92 STWHIP P
21:10 - 21:20
21 :20 - 21 :45
0.17 STWHIP P
0.42 STWHIP P
21 :45 - 22:00
0.25 STWHIP P
22:00 - 23:10
23: 1 0 - 00:00
1.17 STWHIP P
0.83 STWHIP P
1/4/2002
1.50 STWHIP
00:00 - 01 :30
01 :30 - 02:30
02:30 - 02:50
1.00 STWHIP
0.33 STWHIP
02:50 - 03:00 0.17 STWHIP
03:00 - 03:50 0.83 STWHIP
03:50 - 04:10 0.33 STWHIP
04:10 - 04:15 0.08 STWHIP
04:15 - 06:00 1.75 STWHIP
06:00 - 06:30 0.50 STWHIP
06:30 - 07:15 0.75 STWHIP P
07: 15 - 07:30 0.25 STWHIP P
07:30 - 08:00 0.50 DRILL P
08:00 - 08:40 0.67 DRILL N
08:40 - 09:00 0.33 DRILL P
09:00 - 10:55 1.92 DRILL P
10:55 - 11 :35 0.67 DRILL P
11 :35 - 11 :45 0.17 DRILL P
PRE
PRE
PRE
PRE
DECOMP
DECOMP
DECOMP
DECOMP
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Move from F-09 to J-17.
Rig on location. Perform pad inspection with pad operator.
Safety meeting prior to moving over well.
MIRU
Nipple up BOP stack. Accept rig as per new contract at start of
nipple up. Accept rig at 05:00. FLP 0, IA 0, OA 0
Test BOPE. Witness waived by AOGCC
Change packoff. Cut off CTC and install new weld-on CTC
(1.0625"). PT @ 30k, 3500 psi. PT inner reel valve at 3500 psi
Load wiper and displace wI KCI. CT vol by MM was 40.6 bbls
Check well for press, zero. Prespud mtg. Load Baker tools in
pipe shed. MU 3.80" HC window mill, 3.80" string reamer,
2-7/8" BHI motor
Crew change/safety mtg
Fin MU BHA
RIH with BHA #1, Hughes window mill, Baker 2.875 motor, 2
joints of PH6 pipe. No MWD. Circulating KCL out of pits.
9200', Begin pumping 8.5 ppg flo pro as a spacer.
Tag TD, make -12' correction to pinch point on whipstock. PU,
continue circulating used 8.5 ppg flo pro to bit.
10024', Free spin with used flow pro in coil = 2490 psi at 2.5
bpm, Mud to bit, KCL on backside. RIH, tag, make an
additional correction of -0.5'. Begin window milling.
Used flowpro away, swap to new 11.0 ppg flopro.
10027.9', pickup to check free spin. 3160 psi at 2.6 bpm.
Resume milling.
10028.2', Free spin with 11 ppg mud all around. 2.6 bpm, 3430
psi. Continue milling window. 4.2' into it now.
10029.8', ROP dropping off. Increase WOB to 4000 psi.
10031', observed drilling break. Probably in formation.
Checked returns, and it is about impossible to see anything in
cuttings. Continue to drill additional 1 0' of formation.
Pickup back through window easily with no motor work.
Resume milling from 10036.7' to 10041'. Have 10' of open
hole.
Backream up thru window.
RIH thru window down and up dry. No bobbles observed on
weight.
Kick pumps on, PUH, flag pipe at 9800' EOP (9886.3' CTM).
POOH to pick up drilling BHA.
Tag up at surface, circulate 0.5 bpm @ 1800 psi while we hold
crew change.
LD drilling BHA. Mill had center wear and gauged 3.80". SR
had sli wear and gauged 3.80"
Prespudlsafety mtg
MU drilling BHA
WO Sperry XO to replace orientor
MU rest of BHA
RIH w/ BHA #2 (4-1/8" DPI bi bit, straight motor, MWD) to drill
Kingyak
Corr to flag -18'. Log tie-in down from 9975' 2.4/3340, 2.8/3780
Add 3.0', RIH. Tag btm of window 3 times at 10031'. Tag TD
at 10041.7', 22.2k
Printed: 1/21/2002 9:48:00 AM
(
(
BP EXPLORATION
Operations Summary Report
Page 2of16
Legal Well Name: J-17
Common Well Name: J-17B Spud Date: 1/3/2002
Event Name: REENTER+COMPLETE Start: 11/27/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Date From~Tò I-IC>LlrsAç!iyityÇQg~
1/4/2002 11:45 - 12:05 0.33 DRILL P PROD1 Driling 2.6/3540 40'/hr full returns. Drill to 10054', wiper to
window 22.2k, clean
Survey at 10032'=41.92
12:05 - 12:25 0.33 DRILL P PROD1 Drilling 2.5/3500 30'/hr wI 3k WOB/200# diff. Drill to 10060'
and lost chg press. Wiper to window 24.5k w/o pump, clean
12:25 - 12:45 0.33 DRILL P PROD1 Drilling 2.5/3500 30'/hr. See RA at 10031' (on depth). Drill to
10065'. Wiper to window. Survey at 10040'=41.13
12:45 - 13:20 0.58 DRILL P PROD1 Log down from 9980' while WOO, no corr. Will drill to 10068'
13:20 - 13:45 0.42 DRILL P PROD1 RIH and set down at 10031' twice. RIH to TO, clean. Drilling
25'/hr from tag at 10065' 2.6/3550 wI 200# and 1 k WOB.
Wiper to window 22.2k, clean. RBIH, clean. No surveys last
3'. Wiper to window. Full returns thruout-nary a bbllost
13:45 - 15:30 1.75 DRILL P PROD1 POOH for liner. Circ solids to surface
15:30 - 16:20 0.83 DRILL P PROD1 LD drilling BHA
16:20 - 16:35 0.25 CASE P COMP RU to run intermediate liner
16:35 - 16:45 0.17 CASE P COMP Safety mtg re: liner
16:45 - 17:30 0.75 CASE P COMP MU 3-1/2" Baker FS plus 11 jts 3-1/2" 9.2# L-80 STL tubing
17:30 - 17:55 0.42 CASE P COMP MU Baker CTLRT w/ deployment sleeve
17:55 - 18:40 0.75 CASE P COMP Cut off CTC. Install Baker slip type CTC. PT 30k, 3500 psi.
Stab on to CTLRT, Stab on injector.
18:40 - 20:45 2.08 CASE P COMP RTIH with liner on coil. Make -15' correction while RIH to be
consistent with previous runs.
20:45 - 20:55 0.17 CASE P COMP Weight check above window, 29klbs. RIH saw slight bobble on
weight at 10031' (Bottom of Window), Continue RIH to TO.
Tagged up at 10069', should have been 10068' as per last run
in hole. Make -1' depth correction. Pick up hole to drop ball.
20:55 - 21 :30 0.58 CASE P COMP Position reel at 10047', drop 5/8" ball to release liner. Pump 30
bbls mud (Coil vol 40.6 bbls) SI pumping to let the ball fall on
seat. Wait 5 minutes. Resume pumping. Ball on seat.
Sheared at 3700 psi. Expected 2800 psi. Got good indication
of shear. PU to confirm free. Same PU weight as before, only
11 joints of liner, so assume we are free. TOL @ 9732'
21 :30 - 21 :45 0.25 CASE P COMP PJSM prior to pumping cement.
21:45 - 22:15 0.50 CASE P COMP Wait while cementers batch up.
22:15 - 23:00 0.75 CASE P COMP Cement is up to weight. Line up to cementers, pump 5 bbls
water to warm and flush lines. PT cementers hardline to 4000
psi, passed ok. Open coil up to cementers, Pump 5 bbls of
mud push spacer, Pump 7.5 bbls of 15.8 ppg Class G cement.
SD pumping to launch dart.
23:00 - 23:30 0.50 CASE P COMP Pump behind dart 1/2 bb111.0 brine with 1 ppb bio. SO and
check dart launched. Dart away ok. Pump 30 bbls brine/bio at
2 b/m. Slow rate to 1/2 bbl/min after 30 bbls away. Pump dart
on seat. Landed at 41.1 bbls away. (Coil vol 40.6 bbls).
Shear dart at 4200 psi CTP. Pump an additional 2.25 bbls to
displace cement to 80' above shoe. SD pumping, unsting from
CTLRT ok. CIP @ 23:20.
23:30 - 00:00 0.50 CASE P COMP Pickup off bottom clean. PU weight 25klbs. POOH laying in
bio/brine to replace voidage.
1/5/2002 00:00 - 01:10 1.17 CASE COMP Continue to POOH with CTLRT.
01 : 10 - 01 :45 0.58 CASE COMP Tag up at surface, stand back injector, lay down CTLRT.
Recovered all eq ok. Including dart and ball.
01:45 - 03:15 1.50 CLEAN DECOMP Weld on CTC. Pull test to 35klbs, PT to 3500 psi ok. MU
clean out BHA. Pick up checks, stinger and JSN.
Printed: 1/21/2002 9:48:00 AM
(
(
Page 3 of 16
BP EXPLORATION
Operations Summary . Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-17
J-178
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From-Tô HQLit$.ðçtiVity.Coqe NPT, Phase
1/5/2002
2.08 CLEAN
2.00 CLEAN
DECOMP
DECOMP
03: 15 - 05:20
05:20 - 07:20
07:20 - 07:45
07:45 - 08: 15
08:15 - 10:00
10:00 - 10:20
0.42 CLEAN P
0.50 CLEAN P
1.75 CLEAN P
0.33 CLEAN P
DECOMP
DECOMP
DECOMP
DECOMP
10:20 - 10:45
10:45 - 11 :00
0.42 CLEAN P
0.25 CLEAN P
DECOMP
DECOMP
11:00-14:10
3.17 CLEAN P
DECOMP
14:10 - 15:10
1.00 CLEAN P
DECOMP
15:10 -16:50 1.67 CLEAN P DECOMP
16:50 -17:10 0.33 CLEAN P DECOMP
17:10 - 18:00 0.83 DRILL P PROD1
18:00 - 20:20 2.33 DRILL P PROD1
20:20 - 20:35 0.25 DRILL P PROD1
20:35 - 21 :05 0.50 DRILL P PROD1
21 :05 - 21 :30 0.42 DRILL P PROD1
21 :30 - 23:10 1.67 DRILL P PROD1
23: 1 0 - 23:20 0.17 DRILL P PROD1
23:20 - 23:40 0.33 DRILL P PROD1
23:40 - 00:00 0.33 DRILL P PROD1
1/6/2002 00:00 - 00:20 0.33 DRILL P PROD1
00:20 - 00:50 0.50 DRILL P PROD1
00:50 - 02:20 1.50 DRILL P PROD1
02:20 - 02:45 0.42 DRILL P PROD1
02:45 - 03: 10 0.42 DRILL P PROD1
03: 1 0 - 03:25 0.25 DRILL P PROD1
03:25 - 06:00 2.58 DRILL P PROD1
06:00 - 06:45 0.75 DRILL P PROD1
06:45 - 07:05 0.33 DRILL P PROD1
Start:
Rig Release:
Rig Number:
Spud Date: 1/3/2002
End:
11/27/2001
Df3sçriptipnof()peratiþps
RIH with nozzle for cleanout run while WOC.
Stop at 9750', wash top of liner, POOH displacing weighted
mud with 8.9 ppg used flopro. Cement comp str=1 000 psi @
0600. Recovered 20 bbls of cement contaminated mud
LD nozzle assy
MU drillout assy
RIH w BHA #4 (2.80" used D331 DSM)
Corr -15' at 9715'. Cement comp str=2000 psi. Start motor,
RIH. No cement found to 10042'
PUH 23k. Circ. Cuss n' discuss
Forego 2000 psi lap test in case wet shoe exists. Perform
leakoff type test instead. PT to 500 psi and held 5 min wI no
leakoff
RIH and set down at 10063' CTD. Drill from 10063' wI several
stalls at 10063.8' (assume this is float) 1.8/2700 full returns,
300# diff, 0 WOB. Major motor work at 10064.4' (assume
bottom of shoe)
Drill rathole from 10064.4' to 10070' at 10'/hr 1.6/2500 400#,
1500 WOB. Ream float area several times, clean
Note: Bottom of liner is at 10068' and corresponds to 10064.4'
this run. ELMD TD is therefore 10073'
POOH for drilling assy
LD drillout assy. No new wear on mill
MU drillling BHA
RIH wI BHA#5 (1.1 deg motor, used HC bit bit), Stop at 500',
confirm pulses from MWD. RIH to 2900', shallow hole test of
orienter and MWD passed ok.
RIH, tag TD, make -14.5' correction. Kick pumps on. Orient to
135R, Free spin 3120 psi at 1.7 bpm.
On bottom drilling at 115R TF. CTP3518, 1.7/1.7, 65 fph.
Not getting enough reactive now, Orient around.
10097', Resume drilling. Swap to new mud
10132', wiper trip.
Orient around to 135 deg R.
Resume drilling. Now in the Shublick, ROP's down to 20 fph.
Will need to drill Shublick at low ROP until 8490' lVD, about
another 160'. Depth at midnight=10135'.
10135', continue to drill build section in Shublick. Hard drilling.
10138', Need to reorient after every stall. It appears as if the
orienter almost is not locking properly, and it jumps when we
torque it up in a stall.
Resume drilling. Holding a TF of 140R. Getting normal
reactive torque. Appears to be drilling normally now. ROP still
low, about 20 fph.
10154', need to orient to 90R, new tool face. Pick up and
orient.
Resume drilling.
10163' Tool face down to 135R, orient around to 90R again.
Resume drilling.
10190', Update at 06:00, still drilling Shublik. ROP up to 15
fph. Expect to drill Shublik to 10208'.
Drill to 10194'. Last 10' of marginal azimuths show a heading
of +1-115 deg which is too far to the left of plan (need to avoid
Printed: 1/21/2002 9:48:00 AM
(
(
BP EXPLORATION
Operations Summary Report
Pagè'4of 16
Legal Well Name: J-17
Common Well Name: J-17B Spud Date: 1/3/2002
Event Name: REENTER+COMPLETE Start: 11/27/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
Frorrf-To I--I()ur~ 1.'þ~ivitYCpdØ NPT
1/6/2002 06:45 - 07:05 0.33 DRILL P PROD1 close proximity fault). PUH into 3-1/2 liner.
Log tie-in at 10031'. Add 6'. Corr TD is 10200'
07:05 - 08:40 1.58 DRILL P PROD1 POOH to check tools
08:40 - 10:40 2.00 DRILL P PROD1 No new wear on bit. Scribe ok. Change motor, MWD probe
and pulser (to test SS backup tools), orientor, MHA. Install DS
new shorty MHA for test (chks, disc, CÎrc, burst)
10:40 - 12:45 2.08 DRILL P PROD1 RIH wI BHA #6 (1.5 deg motor). Set down at TOL at 9750'
CTD
12:45 - 13:05 0.33 DRILL P PROD1 Tag at TO 10214.8' and corr to 10200'. 1.5/2480/18L Orient to
right while thawing CTP sensors (-34F, -80 CF)
13:05 -14:15 1.17 DRILL P PROD1 Drilling 15-25'/hr 1.7/2920/111 R in Shublik. At 10215' it's
becoming apparent that magnetics from J-17 and J-17a were
probably pulling az readings to east on prior run
14:15 - 14:25 0.17 DRILL P PROD1 Drilling break to 11 0-130'/hr at 10223'. Drill to 10229'. First
good survey says 154? deg/28.5 deg at 10201'
14:25 - 15:50 1.42 DRILL P PROD1 Wiper to window. POOH for motor
15:50 -17:15 1.42 DRILL P PROD1 No new wear on bit. Change motor, MWD probe (pull probe to
toggle to fast data rate)
17:15 -19:20 2.08 DRILL P PROD1 RIH w/ BHA #7 (0.9 deg motor)
19:20 - 19:40 0.33 DRILL P PROD1 Tag 10245', make -16' correction to get on depth with last TD
prior to tripping. Set depth to 10229', pick up to orient. Orient
to 62L.
19:40 - 20:10 0.50 DRILL P PROD1 Tag up 10229', resume drilling. 1.6/1.6/2900 psi free spin.
Drilling at 3150 psi, 100 fph.
20: 10 - 20:20 0.17 DRILL P PROD1 10270', Orient to 80R.
20:20 - 21 :40 1.33 DRILL N RREP PROD1 10275', #2 mud pump down. only 1 working mud pump at this
time. PUH to casing shoe to make repairs. Circulate at 9720',
up in 5-1/2".
21 :40 - 21 :45 0.08 DRILL P PROD1 Resume drilling. 1.7/1.7/3450, TF=107R,
21 :45 - 22:05 0.33 DRILL P PROD1 Orient around to 80R.
22:05 - 0.00 DRILL P PROD1 Resume drilling. 1.6/1.6/3550 psi, TF=84R, ROP=115 fph.
1/7/2002 00:00 - 00:15 0.25 DRILL P PROD1 Continue to drill build section fr 10370'. 1.6/1.6/3340 psi. TF
70R.
00:15 - 00:35 0.33 DRILL P PROD1 10375', ROP slowed down to 20 fph. Geo reports this is top of
zone 3 conglomerate. Expect slow drilling for the next 120'
MD.
00:35 - 00:55 0.33 DRILL P PROD1 10392' Orient high side.
00:55 - 01:10 0.25 DRILL P PROD1 Resume drilling.
01:10 - 03:00 1.83 DRILL N DFAL PROD1 10398', Stalled. Pump pressures very high after stall. Possibly
plugged bit or shucked stator. Cycle pumps attempt to free up.
No success. POOH.
03:00 - 04:00 1.00 DRILL N DFAL PROD1 Tag up at surface. Check motor, turns ok. Check bit. All
nozzles plugged with rubber except for 1. Probably shucked
stator rubber. Bit in great shape (1/1). Change out motors.
Pick up motor run previously at 1.5 deg. Readjust to 1.15 deg.
Re run same bit.
04:00 - 06:05 2.08 DRILL N DFAL PROD1 RIH with BHA #8. 1.15 deg motor. Sperry MWD, Hughes bi
center bit, Sperry orienter. Shallow hole test at 500' to confirm
MWD ok. RIH.
06:05 - 06:20 0.25 DRILL N PROD1 Tag bottom at 10414', make -16 correction to last tag of
10398', orient to 30R.
06:20 - 09:00 2.67 DRILL P PROD1 Drill from 10398-403' 1.6/2950/26R where MWD tool switched
Printed: 1/21/2002 9:48:00 AM
('
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
(~
BPEXPLORATION
Operations Summary Report
J-17
J-17B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
~çtivity CQ.dE9 N PI
1/7/2002
06:20 - 09:00
09:00 - 10:40
10:40 - 12:25
12:25 - 14:15
14:15 - 14:40
Start:
Rig Release:
Rig Number:
Spud Date: 1/3/2002
End:
11/27/2001
2.67 DRILL P
PROD1
1.67 DRILL P
1.75 DRILL P
PROD1
PROD1
1.83 DRILL P
PROD1
0.42 DRILL N
DFAL PROD1
14:40 - 14:55 0.25 DRILL P PROD1
14:55 -15:10 0.25 DRILL N DFAL PROD1
15:10 - 15:35 0.42 DRILL N PROD1
15:35 - 15:55 0.33 DRILL P PROD1
15:55 - 17:00 1.08 DRILL P PROD1
17:00 - 17:15 0.25 DRILL P PROD1
17:15 - 18:30 1.25 DRILL P PROD1
18:30 - 18:45 0.25 DRILL P PROD1
18:45 - 20:15 1.50 DRILL P PROD1
20: 15 - 22:20 2.08 DRILL P PROD1
22:20 - 23:00
23:00 - 00:00
1/8/2002
00:00 - 00:55
00:55 - 02:35
0.67 DRILL N
DFAL PROD1
1.00 DRILL N
DFAL PROD1
0.92 DRILL N
DFAL PROD1
1.67 DRILL N
DFAL PROD1
from fast data to slow. No way to toggle while in hole to switch
back. 23 ought to be slow digging so will live wI it
10411' Wiper to window. POOH for less aggressive bit
OOH. Change bit, top of MWD probe, MHA
BHI shop inspection of prior motor indicated that stator was
intact. Pull SS MWD probe and found top rubber centralizer
missing. Break down carrier and retrieve additional pieces
End satisfactory test of DS MHA
RIH wI BHA #9 (used 2.80" D-331 DSM, 1.15 deg motor, BOT
MHA). SHT
Start motor in 3-/12" liner and MWD worked for a short time
then died. Work to get a pulse and DOA when tagging TO at
10424' CTD. Corrto 10411'. PUH a few times hoping to get
oriented the right direction
Drill 5' of hole at 45'/hr 2.0/3600 to 10416'
POOH for MWD. MWD started working. RBIH
Log tie-in from 10050' while checking MWD reliability. Add
2.0'. Check orientor and tool restarts ok. Lucked out. RBIH to
drill
Orient to drill
Drilling 1.7/2960/26R and stack wt to 5.3k before mill
completely quit at 10419'
Log MAD pass up from 10150-10050'
POOH for bit
Safety meeting prior to changing out BHA. 1 new Nordic hand
on rig. Reviewed process, hand is going to work as observer
for this operation, and will not participate.
Lay down BHA 9. Change MWD probes and pulser. change
bit. Replace D331 mill with Hycaolog D100 bicentered bit.
RIH with BHA 10. Hycalog bit, Sperry MWD, same Sperry
orienter and BOT MHA as last run. Stop at 600'. Shallow hole
test of MWD passed ok. RIH. MWD working while RIH at 0.3
bpm. Pulsing ok.
Attempt to make tie in pass down over RA tag at 10031'. MWD
tool will not pulse. Free spin 1.7 bpm at 2900 psi. Same free
spin observed on previous runs. (Probably not plugging in
BHA). Cycle pumps, etc. No success. RIH to tag bottom.
Tag hard several times, while cycling pumps. Tagged at
expected TD of 10420'. No success. MWD will not pulse.
POOH. MWD - no pulses. Free spin now 1.7 2850 psi.
Continue to POOH. At 2800' while pumping at 1.0 bpm, MWD
started pulsing worked ok for 100', then quit. Continue to
POOH to allow sperry to diagnose problem.
Continue to POOH to diagnose MWD problem. Stop at 800' to
attempt to get pulser working. No success.
Tag up at surface, tear everything down, try to diagnose MWD
problem. Found battery dead. Was a fresh battery for this run
in hole. Sperry speculates it could be either a bad battery, or
this pulser was shorting it out. Change back to MWD tool and
pulser that failed yesterday on run 9. It was checked out by
Sperry hands on location can and found to be operating
properly. Previous failure was atributed to debris in the tool
when downhole. Make up BHA#11 with Hycalog DS100
Printed: 1/21/2002 9:48:00 AM
('
(
BP EXPLORATION
Operations Summary Report
Page 6 of 16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Spud Date: 1/3/2002
Start: 11/27/2001 End:
Rig Release:
Rig Number:
D~§criptiónøf.qp~rati()n.s
1/8/2002 00:55 - 02:35 1.67 DRILL N DFAL PROD1 bicentered bit (New last run), 1.15 deg motor, MWD package
from BHA 9, same orienter and MHA as last run.
02:35 - 04:45 2.17 DRILL N DFAL PROD1 RIH with BHA 11 to 500'. Kick on pumps to 1.5 bpm. Perform
shallow hole test of MWD. Works fine. Continue RIH. Stop at
5000', MWD tool still worked ok. Continue to RIH.
04:45 - 05:00 0.25 DRILL P PROD1 Stop at 10045'. Make -15' correction. Bring pumps on to 1.5
bpm, MWD working. Start tie in pass down. Make a +4'
correction on RA tag at 1 0031'.
05:00 - 05:30 0.50 DRILL P PROD1 Orient to 30R.
05:30 - 07:00 1.50 DRILL P PROD1 Tag bottom at 10420', where expected. Resume drilling.
1.7/1.7/2950 psi free spin. Drilling at 3200 psi w/200-1500#
WOB
07:00 - 12:00 5.00 DRILL P PROD1 10450' Bit is well done and geo says 15' more of hard digging
12:00 -12:15 0.25 DRILL P PROD1 Wiper to window
12:15 - 13:50 1.58 DRILL P PROD1 POOH for bit. Check loose reel drive bushing at 5000'
13:50 - 15:20 1.50 DRILL P PROD1 Change bit, MHA. Pull MWD probe after rubber found in bit
nozzle. OS repair reel drive pin. MU BHA
15:20 - 17:45 2.42 DRILL P PROD1 RIH with drilling BHA I Shallow test @ 3000'. RIH.
17:45 - 18:00 0.25 DRILL P PROD1 Tag TO and correct -15 ft CTD. Orient TF to 30R.
18:00 - 18:30 0.50 DRILL P PROD1 Drilling, Lost MWD pulse after reaming 1 ft. Cycle pump, drill
ahead to get signal.
Drilled to 10453 ft. No Signal.
18:30 - 20:45 2.25 DRILL N DFAL PROD1 POOH. No MWD signal. Tool cycling on and off while POOH.
20:45 - 21 :00 0.25 DRILL N DFAL PROD1 Hold PJSM prior to LD MWD tool.
21 :00 - 22:45 1.75 DRILL N DFAL PROD1 Trouble shoot MWD. Found intermittant short in battary/tool
interface module. (This same interface was in the hole during
first battery failure). Replace module. Test tool (ok)
22:45 - 23: 15 0.50 DRILL N DFAL PROD1 MU drilling assembly (BHA 13).
23:15 - 00:00 0.75 DRILL N DFAL PROD1 RIH. Shallow test MWD.
1/9/2002 00:00 - 01 :30 1.50 DRILL N DFAL PROD1 Continue to RIH with BHA 13 (1.1 mtr with Hyc bi-cent)
01 :30 - 01 :45 0.25 DRILL P PROD1 Tag TO at 10453'. Orient to 30R.
01 :45 - 05:30 3.75 DRILL P PROD1 Drilling. 1.8/3300/30R. 20-25 fph ROP. Drilled to 10,533 ft.
05:30 - 06:30 1.00 DRILL N DFAL PROD1 Losing communication with MWD tool. Cutting in and out.
Cycle pumps etc to try and revive tool. No luck.
06:30 - 07:00 0.50 DRILL P PROD1 Wiper trip to shoe. MWD working again. RIH. MWD signal
quit again.
07:00 - 09:00 2.00 DRILL N DFAL PROD1 POOH for failed Sperry MWD tools.
09:00 - 09:15 0.25 DRILL N DFAL PROD1 SAFETY MEETING. Reviewed procedure and hazards to lay
out BHA.
09: 15 - 09:45 0.50 DRILL N DFAL PROD1 Layout MWD BHA. Down load Sperry tool information. RID
Sperry MWD.
09:45 - 16:00 6.25 DRILL P PROD1 Perform weekly BOPE pressure I function test. Witness
waived by AOGCC inspector, John Crisp. Send test report to
AOGCC.
16:00 - 17:00 1.00 DRILL N DFAL PROD1 Rig up BHI MWD trailer, comm lines and MWD BHA.
17:00 - 17:15 0.25 DRILL N DFAL PROD1 SAFETY MEETING. Review BHA MIU procedure and hazards.
17:15 - 18:30 1.25 DRILL N DFAL PROD1 M/U BH I MWD BHA #14, with 1.15 deg motor and Bit #12, New
HC, Bi-center bit.
18:30 - 19:00 0.50 DRILL N DFAL PROD1 RIH with BHA #14 with BHI MWD tools.
19:00 - 20:30 1.50 DRILL N DFAL PROD1 Rig down time. Trouble shoot Baker MWD surface gear.
Tools working OK.
20:30 - 22:30 2.00 DRILL N DFAL PROD1 RIH.
Printed: 1/21/2002 9:4B:OO AM
J-17
J-17B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From .~.. To Hþljr§ l;\çtiyityÇþq~ NPT
('
(
BP EXPLORATION
Operations.. Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-17
J-17B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
HQllr~8ctivi.WGgdê NPT
Page? of 16
Start:
Rig Release:
Rig Number:
11/27/2001
Spud Date: 1/3/2002
End:
1/9/2002
22:30 - 00:00
DFAL PROD1
1.50 DRILL N
1/10/2002
2.50 DRILL N
DFAL PROD1
00:00 - 02:30
02:30 - 03:30 1.00 DRILL N DFAL PROD1
03:30 - 05:00 1.50 DRILL P PROD1
05:00 - 05:15 0.25 DRILL P PROD1
05: 15 - 07:45 2.50 DRILL P PROD1
07:45 - 08: 15 0.50 DRILL P PROD1
08:15 - 08:30 0.25 DRILL P PROD1
08:30 - 09: 15 0.75 DRILL P PROD1
09: 15 - 09:45 0.50 DRILL P PROD1
09:45 - 12:00 2.25 DRILL P PROD1
12:00 - 14:00 2.00 DRILL P PROD1
14:00 - 14:30 0.50 DRILL P PROD1
14:30 - 16:45 2.25 DRILL P PROD1
16:45 - 17:45 1.00 DRILL P PROD1
17:45 - 19:30 1.75 DRILL P PROD1
19:30 - 21 :30 2.00 DRILL P PROD1
21 :30 - 21 :45 0.25 DRILL P PROD1
21 :45 - 23:00 1.25 DRILL P PROD1
23:00 - 00:00 1.00 DRILL P PROD1
1/11/2002 00:00 - 01 :30 1.50 DRILL P PROD1
01 :30 - 02:30 1.00 DRILL P PROD1
02:30 - 03:00 0.50 DRILL P PROD1
03:00 - 03:15 0.25 DRILL P PROD1
03:15 - 05:15 2.00 DRILL P PROD1
05: 15 - 05:45 0.50 DRILL P PROD1
05:45 - 07:00 1.25 DRILL P PROD1
07:00 - 09:00 2.00 DRILL P PROD1
09:00 - 10:00 1.00 DRILL P PROD1
10:00 - 11 :00 1.00 DRILL P PROD1
11:00-12:10 1.17 DRILL P PROD1
12:10 -13:40 1.50 DRILL P PROD1
Rig down time. Tag TD at 10,533' (corrected -16' after actual
tag at 10549'). Trouble shoot MWD depth calibration.
Log GR MADD pass from TD. Stop for surveys to verify
"erratic" Sperry survey data. Replaced all Sperry directional
surveys with BHI data. Sperry GR also did not match well with
Baker GR or original soniclgr log. May have to madd pass
entire OH section for correlation purposes.
Orient to 50R.
Drilling. 1.6/2700/30R ROP:40-60 fph. Drill to 10580'
Orient to 65R.
Drilling. 1.7/1.7 bpm, 2900 psi, 90R, Drilled to 10,700 ft.
Several stalls between 10670 - 10700 ft.
Wiper trip to window.
Log Tie-in with GR at RA tag at 10,031 ft. Add 8 ft to CTD.
RIH to TD. Tag TO at 10,708 ft.
Orient TF to 80R.
Drilling, 1.7 I 1.7 bpm, 2800 psi, TF = 80R, Incl = 70 deg,
Drilled to 10,762 ft.
Drilling, 1.7 11.7 bpm, 2800 psi, TF = 90R, Incl = 74 deg,
Drilled to 10,800 ft.
Orient TF to 60R.
Drilling, 1.71 1.7 bpm, 2800 psi, TF = 60R, Incl = 76 deg,
Drilled to 10,850 ft.
Wiper trip to shoe. Hole was clean. RIH to TD.
Drilling, 1.7 11.7 bpm, 2800 psi, TF = 65R, Incl = deg,
Drilled to 10,880'. Very slow drilling, stacking 10K on bit, 15-20
fph.
POOH to check bit & mtr.
Hold PJSM to discuss handling BHA.
LD motor & bit. Down load gr memory. Bit 1-1-0. MU 1.1 mtr
with Hycalog bi-center bit.
RIH. Shallow test MWD & orienter. Continue in hole.
Continue to RIH.
Log gr tie in from 10025'. Subtract 12' correction.
RIH. Tag TD at 10878'.
Orient to 80-90R.
Drilling. 1.7 /2800psi / TF:85R. Drill to 10941'. Wttransfer
deteriorating. Call for new mud. Inc:79.7 Az:231
Orient around to 45R.
Drilling. 1.7 11.7 bpm, 2800 psi, 82 incl, Drilled to 10,970 ft.
Found 14N shale higher than expected at 10940 ft, 8923'
lVDSS.
Drilling, Swap to new FloPro, old system drilled total of 900 ft.
1.7 I 1.7 bpm, 2800 psi, TF = 20R, incl = 88 deg. Drilled to
11,020 ft.
Drilling, 1.7 /1.7 bpm, 2800 psi, TF = 20 R, ROP = 40-60 fph.
Landed well at 11,000 ft at 8929 ft TVDSS. Drilled to 11,050 ft.
Log MAD pass up from 1 0900 - 10850 ft.
Wiper trip to shoe. Clean hole. RIH and ream 14N shale at
1 0940 - 11050'
Ream 14N shales. Stacking wt. when RIH. Ream up and
down 4 times. Shale OK for now.
Printed: 1/21/2002 9:48:00 AM
(
(
BP EXPLORATION
Operations Summary Report
Legal Well Name: J-17
Common Well Name: J-17B
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 1
Date From..To Hours }\çti"ity Code NPT Phase
... .....
1/11/2002 13:40 - 14:20 0.67 DRILL P PROD1
14:20 - 14:40 0.33 DRILL P PROD1
14:40 - 15:45 1.08 DRILL P PROD1
15:45 - 16:45 1.00 DRILL P PROD1
16:45 - 17:15 0.50 DRILL P PROD1
17:15 - 18:15 1.00 DRILL P PROD1
18:15 - 18:30 0.25 DRILL P PROD1
18:30 - 19:15 0.75 DRILL P PROD1
19:15 -19:30 0.25 DRILL P PROD1
19:30 - 20:00 0.50 DRILL P PROD1
20:00 - 21 :30 1.50 DRILL P PROD1
21 :30 - 22:15 0.75 DRILL P PROD1
22:15 - 22:30 0.25 DRILL P PROD1
22:30 - 00:00 1.50 DRILL P PROD1
1/12/2002 00:00 - 00:30 0.50 DRILL P PROD1
00:30 - 01 :30 1.00 DRILL P PROD1
01 :30 - 02:30 1.00 DRILL N DPRB PROD1
02:30 - 03:00 0.50 DRILL P PROD1
03:00 - 04:00 1.00 DRILL P PROD1
04:00 - 05:00 1.00 DRILL P PROD1
05:00 - 06:00 1.00 DRILL P PROD1
06:00 - 07: 15 1.25 DRILL P PROD1
07:15 - 09:00 1.75 DRILL P PROD1
09:00 - 09:45 0.75 DRILL P PROD1
09:45 - 10:30 0.75 DRILL P PROD1
10:30 -11:15 0.75 DRILL P PROD1
11:15 -14:30 3.25 DRILL P PROD1
14:30 - 14:45 0.25 DRILL P PROD1
14:45 - 15:30 0.75 DRILL P PROD1
15:30 - 15:45 0.25 CASE P COMP
15:45 -17:15 1.50 CASE P COMP
Page Bof 16
Start:
Rig Release:
Rig Number:
Spud Date: 1/3/2002
End:
11/27/2001
[)~$criptiC)rr()f OperatioQs
Drilling, 1.7 11.7 bpm, 2800 psi, TF = 90R, Incl. = 94.5 deg.
Drill back into sand at 11062 ft, 8924 ft lVDSS. Drill to 11,
Orient TF.
Drilling, 1.7 I 1.7 bpm, 2800 psi, TF = 11 OR, Incl = 91.5 deg.
Drilled to 11,200 ft.
ROP = 120 fph. Very clean sand.
Wiper trip to shoe. Backream thru 14N shale at 5 fpm, clean
to shoe.
Log GR tie-in to RA tag at 10,031 ft. Add 6 ft CTD.
RIH to TD. Ream down thru shale at 5 fpm.
Orient TF.
Drilling. 1.7 I 2800 psi I TF:90R. Trying to level out and hold
89-90 deg inc. Drill to 11300'.
Orient to start left turn. Also need to drop angle slightly.
Drilling. 1.7/2800fs/120L Drill to 11371'. 89.5 Inc, Az:278
Short trip to window. Back ream from 11080'- 10950'. Some
overpulls & mtr work. Continue up to shoe.
RIH. Tag up on shale at 10949' Unable to work through
pumps on or off. Orient to original TF 50R. Begin reaming
through. Rough from 10950' - 10960'. Rest of interval down to
11060' fairly smooth.
Continue in hole. Tag TD and correct to 11371.
Drilling. 1.8 I 2800 psi /125L. Drill to 11480' Inc:88.7 deg
Drill to 11498'.
Short trip to window
Stop at 10941'. Work through shale. Had to "redrill" from
10940-960 & 10998-11010'. Rest of N14 fairly smooth.
Continue to run to btm.
Orient to 75R
Drilling. 1.7 /2800 psi /75R. Drill to 11534'. TF keeps rolling
rig ht.
Orient around again, to 60R. Tool face floping to LS. Try
several times to orient around. Orienter has partially failed.
Drilling. 1.7 11.7 bpm, 2900 psi, 90R, Orienter holding 90R
OK. Added 2 PPB Kla-Gard to Flopro. Drilled to 11,600 ft.
Geologists called TD.
Wiper trip to shoe. Back ream 14N shale at 4 fpm. Overpull of
20K at 11 000-1 0980 ft.
Log final Tie-in with RA tag at 10,031 ft. Added 18 ft CTD.
RIH clean to 10900 ft. Orient to 20R.
Ream down thru 14N shale at 5 fpm. Motor work at 10950' and
11000 ft. Never did stack wt. Cont. RIH to TO. Tag corrected
TD at 11,616 ft BKB.
POOH to run 2-3/8" Liner. Back ream thru 14N shale at 10
FPM. POOH.
SAFETY MEETING. Review procedure and hazards for laying
out MWD BHA.
LIO BHI MWD BHA. Recover all BHA. Bit was 1-1-1.
SAFETY MEETING. Review liner running procedure and
hazard mitigation.
Run 2-3/8", 4.43#, L-80, STL Liner with 2 float Jts. with BKR Fit
Shoe, Fit CLLR and Latch CLLR. Run STL Turbos on top
each Jt in open hole.
Printed: 1/21/2002 9:48:00 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
(
("
BP EXPLORATION
Operations Summary Report
J-17
J-178
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Page 9 of 16
Start:
Rig Release:
Rig Number:
Spud Date: 1/3/2002
End:
11/27/2001
1/12/2002
15:45 - 17:15
From~To Hpl.JrsAc:tivity Cod~ NPT Phase
1.50 CASE P
COMP
17:15 -17:30 0.25 CASE P COMP
17:30 - 18:00 0.50 CASE P COMP
18:00 -18:15 0.25 CASE P COMP
18:15 - 19:45 1.50 CASE P COMP
19:45 - 21 :30 1.75 CASE P COMP
21 :30 - 22:00 0.50 CASE P COMP
22:00 - 00:00 2.00 CASE N DPRB COMP
1/13/2002 00:00 - 01 :45 1.75 CASE N DPRB COMP
01 :45 - 02:15 0.50 CASE N DPRB COMP
02: 15 - 02:45 0.50 CASE N DPRB COMP
02:45 - 04:00 1.25 CASE N DPRB COMP
04:00 - 05:00 1.00 CASE N DPRB COMP
05:00 -11:15 6.25 CASE N DPRB COMP
11: 15 - 11 :30 0.25 CASE N DPRB COMP
11:30 - 12:45 1.25 CASE N DPRB COMP
12:45 - 15:00 2.25 CASE N DPRB COMP
15:00 - 15:45 0.75 CASE N DPRB COMP
15:45 -17:15 1.50 CASE N DPRB COMP
17:15 - 19:00
19:00 - 20:30
1.75 CASE N
DPRB COMP
1.50 CASE N
DPRB COMP
oesçriptiQqofOperßtions
Run total of 24 jts and run 10ft pup with turbo for CCL marker
jt. [Top will be at 10820 ft].
Drifted all STL connections after make up with 1.85" drift on 1"
CSH Jt and pup.
Fill liner with water.
Run 2-3/8", 4.43#, L-80, STL Liner with STL turbos on top of
each Jt in open hole.
SAFETY MEETING. Review liner running procedure and
hazard mitigation with night crew.
Run 2-3/8", 4.43#, L-80, STL Liner with STL turbos on top of
each Jt in open hole.
Run total of 58 Jts. 1 STL Turbo on top of every third Jt. in
liner lap.
Total of 50 turbos.
Install Baker slip type connector. Test same. MIU BKR
CTLRT with 1.80" OD Liner wiper plug and 3.70" Deployment
Sleeve with 4" GS Profile.
RIH with liner assy. Stop at 8000' EOP flag. Subtract 20'
correction. Prep for mud swap. 15k# dn, 28k# up wt. Continue
in hole.
Tag up out side shoe at 10087' (Sag River). Pressure up
pumping at min rate. Work pipe and begin to wash in hole. PU
clean every 2'-3' of progress. Washedlbeat past top Shublik
(10108') to 10123'. Unable to move any further. Clean
pickups.
POOH to stand back 2-3/8" liner.
Set back injector. LD running tool. Install TIW valve.
Hold PJSM regarding handling of liner.
Stand back liner in derrick (29 stands) Found float shoe
completely packed with clay material.
RU Baker MWD. Prep floor for running drilling assembly.
Install slim hole weld on connector (GBR).
Wait on BHI to rig up. Weight up FloPro in pits to 9.2 PPG.
Add 1 drum Klay-Gard.
SAFETY MEETING. Review Procedure and Hazards for BHA
make up.
MIU BHI MWD BHA with 1.1 deg motor and used HYC
bi-center bit.
RIH with MWD BHA. Shallow test MWD and orienter.
Orient TF to 140R.
Ream out 3.5" liner shoe. First motor work at 10080 ft. Ream
down at 5 fpm, stack wt at 10131 ft, 3 times. RIH at 30 fpm
with 0.8 bpm and went past 10131 ft with no wt loss or motor
work, indicating a ledge. Ream in hole at 20 fpm.
Stack wt in shale at 10590 ft, work thru on third try. Ream in
hole.
Stack wt in shale at 10942 ft. Ream down at 5 fpm with 20R
TF [TF we drilled at].
1.7 I 1.7 bpm, 3300 psi, 9.2 ppg FloPro. Ream down to 10990
ft.
Continue to ream 14N shales. Work down to 11000' in 5'-10'
bites. Back ream to 10965'. Packed off and stuck. Work pipe
& cycle pumps. Pull to 70k# max. No progress.
Printed: 1/21/2002 9:48:00 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
(
(
BPEXPLORATION
Operations Summary Report
J-17
J-17B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Page 10 of 16
Start:
Rig Release:
Rig Number:
Spud Date: 1/3/2002
End:
11/27/2001
From-To H()IJI§AçtiyityÇqq~ NPT
QE!sçrip~ióqqfqpêtatiol1s
1/13/2002
20:30 - 22:30 2.00 CASE N STUC COMP
22:30 - 22:45 0.25 CASE N STUC COMP
22:45 - 00:00 1.25 CASE N STUC COMP
00:00 - 01:15 1.25 CASE N STUC COMP
01 :15 - 02:00 0.75 CASE N STUC COMP
1/14/2002
02:00 - 02:45
0.75 CASE N
STUC COMP
02:45 - 05: 15 2.50 CASE N DPRB COMP
05: 15 - 05:30 0.25 CASE N DPRB COMP
05:30 - 06:30 1.00 CASE N DPRB COMP
06:30 - 08:30 2.00 CASE N DPRB COMP
08:30 - 09:00 0.50 STKOH N DPRB PROD1
09:00 - 11 :00 2.00 STKOH N DPRB PROD1
11 :00 - 13:00 2.00 STKOH N DPRB PROD1
13:00 - 15:00
2.00 STKOH N
DPRB PROD1
15:00 - 15:30 0.50 STKOH N DPRB PROD1
15:30 - 15:45 0.25 STKOH N DPRB PROD1
15:45 - 15:55 0.17 STKOH N DPRB PROD1
15:55 - 17:00 1.08 STKOH N DPRB PROD1
17:00 - 18:00
1.00 STKOH N
DPRB PROD1
Order crude and discuss options with town. Continue to relax
hole 15 minutes, then work pipe and repeat.
Hold PJSM with crews & drivers regarding pumping crude.
Pump 30 bbls crude down coil. Spot same. Work pipe.
Allow crude to soak.
Pressure backside to 750 psi while pumping min rate down
coil. Weight slowly came back, came free from 10965'. Begin
to POOH. No returns, 3500 psi circ press at 1.0 bpm (still
packed off)
Stuck in 3-1/2" liner at 9930'. Work pipe and pressure
backside to 1000 psi. Able to POOH at 2-3 fpm @ 60K#.
Work loose at 9890'. Continue to POOH slow. Finally made it
into tubing.
POOH to check BHA. Circulate OOH. Seeing 100-200 psi
pressure increases while circ OOH.
Hold PJSM to review BHA lay down procedure.
LD BHA assy.
Wait on orders. Decide to cement back.
M/U cementing BHA. 2.35" nozzle, 2 jts 2" PH6, hyd disc, circ
sub, XO and CTC.
Total length = 66.3 ft.
RIH with cementing nozzle. Pumping 2.3 bpm, 2600 psi.
Run inside 3.5" liner, no wt loss. pump 2.9 bpm, 3600 psi.
26K up wt, 13K dwn.
RIH at 20 fpm, 2.9 bpm, 3600 psi, Slight press inc I wt
decrease at 10140 ft. No problem, RIH jetting to 10310 ft.
POOH at 25 fpm to top of 3.5" liner. 2.9 bpm, 3500 psi, Jet up
to 9600 ft. No overpull I press inc. RIH jetting at 2.9 bpm. No
wt loss or press inc at 10130 ft. RIH jetting 2.9 bpm to 10935
ft.
Jet open hole at 2.9 bpm up to top of 3.5" liner. No overpulls.
RIH to 10935 ft at 25 fpm while circulating 2.9 bpm at 3600 psi.
Lay in 10 bbl very high vis FloPro pill from 10935 - 10800 ft.
Cont. circ. while waiting on cementers.
Rig up DS cementers. Batch up 17.2 ppg, G cement slurry.
CMT at wt at 15:30.
SAFETY MEETING. Review cement plug procedure and
hazards with personnel.
Pressure test cement line.
Stage 8 bbls, 17.2 PPG, Class G cement. 2.5 hours thickening
time. Stop pump.
Purge cementing lines. Displace cement with rig pump using
micromotion meter.
2.0 bpm I 3300 psi at 5 bbls displ. 2.0 bpm 12400 at 20 bbl
displ.
Lay in cement from 10,915 ft. Lay in at 1.0 bpm /1000 psi I
70 fpm. Top of cement plug at 10,180 ft [using 20% excess].
Full returns. Pull to safety at 9500'
Cement in place at 16:45 hrs.
Wait on cement to gel. Press test against cement plug with
550 psi. OK.
Cleanout cement to 10,660 ft CTD. 2.3 bpm 12750 psi, 30
Printed: 1/21/2002 9:48:00 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
(
t
(
BPEXPLORA TION
Operations Summary Report
J-17
J-17B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Page 110f 16
Start:
Rig Release:
Rig Number:
Spud Date: 1/3/2002
End:
11/27/2001
1/1412002
17:00 - 18:00
Frorn~T°f:"lql.Jr§Açti¥ityÇqg~ N PT
18:00 - 20:30
1.00 STKOH N
DPRB PROD1
2.50 STKOH N
DPRB PROD1
20:30 - 20:45 0.25 STKOH N DPRB PROD1
20:45 - 21 :00 0.25 STKOH N DPRB PROD1
21 :00 - 21 :30 0.50 STKOH N DPRB PROD1
21 :30 - 00:00 2.50 BOPSU N DPRB PROD1
1/15/2002 00:00 - 04:00 4.00 BOPSU N DPRB PROD1
04:00 - 04:15 0.25 STKOH N DPRB PROD1
04: 15 - 05:00 0.75 STKOH N DPRB PROD1
05:00 - 07:15 2.25 STKOH N DPRB PROD1
07:15 - 08:00 0.75 STKOH N DPRB PROD1
08:00 - 08:15 0.25 STKOH N DPRB PROD1
08:15 -11:00 2.75 STKOH N DPRB PROD1
11 :00 - 11 :30 0.50 STKOH N DPRB PROD1
11 :30 - 13:30 2.00 STKOH N DPRB PROD1
13:30 - 14:15 0.75 STKOH N DPRB PROD1
14:15 -17:00 2.75 STKOH N DPRB PROD1
17:00 - 18:30 1.50 STKOH N DPRB PROD1
18:30 - 20:20 1.83 STKOH N DPRB PROD1
20:20 - 22:00 1.67 STKOH N DPRB PROD1
22:00 - 22:30 0.50 STKOH N DPRB PROD1
22:30 - 23:30 1.00 STKOH N DPRB PROD1
23:30 - 00:00 0.50 STKOH N DPRB PROD1
1/16/2002 00:00 - 01 :20 1.33 STKOH N DPRB PROD1
01 :20 - 01 :40 0.33 STKOH N DPRB PROD1
01 :40 - 01 :50
01 :50 - 02:25
0.17 STKOH N
DPRB PROD1
0.58 STKOH N
DPRB PROD1
fpm. Found cement top at 10480 ft based on increase in pump
press.
POOH at 30 fpm in open hole while chasing out cement. 2.5
bpm, 3000 psi.
No hole problems. Pump 2.7 bpm 13200 psi in 5 1/2" tubing.
POOH. Send cement rtns outside.
Hold PJSM to discuss handling BHA and jetting BOPs.
LD cementing assy. MU jetting nozzle.
Jet out BOP stack.
Weekly BOP pressure test. Witness waived by J. Jones,
AOGCC.
Continue to test BOPS. No failures. Send test report to
AOGCC.
Hold PJSM to review BHA MIU procedures.
MU BHA #17 - 1.25 deg mtr wI used 3.0 HTC bicenter bit.
RIH with drilling assembly. Shallow test MWD & orienter.
Continue in hole.
Log tie-in at RA tag at 10031 ft. Total correction of -13 ft. CTD.
Tag hard cement at 10667 ft.
Drilling, TF = 20L, 1.7 11.7 bpm, 2800 psi, Surveys indicated
sidetracted from
old hole at 10,690 ft BKB. Drilled ahead, surveys came back to
old hole.
Drilled to 10742 ft.
Orient TF to 60L.
Drilling, time drill 1 fph at 60L. 1.7 I 1.7 bpm, 2800 psi.
Drilling, time drill 2 fph at 60L, 1.7 11.7 bpm, 2800 psi. Drilled
to 10745 ft.
Generators #1 & 2, power share failed. Running on Gen #1.
Call for rig electrician.
Drilling, time drill 4 fph at 80L. 1.7 I 1.7 bpm, 2800 psi.
Drilling, time drill 6 fph at 80L. 1.7 /1.7 bpm, 2700 psi. 2-
4000# WOB.
Drilled to 10,759 ft.
Drilling, 80L TF, 12 fph, 1.7 11.7 bpm, 2700 psi, 2-4000#
WOB.
18:30 update. Drilling ahead at 10765', 90L, 1.7/1.7/2850 psi.
Azimuths still consistent with old wellbore, despite opposite tool
face. Continue to drill holding 90L tool face.
10793', Still tracking the old well bore. POOH for bigger motor
and different bit.
Tag up at surface, safety meeting prior to riging down BHA.
Changeout BHA. Lay down bit and motor. Pick up 1.75 deg
motor and DPI PDC bit for sidetracking.
RIH With BHA #18, 1.75 deg motor, and 2.75" PDC bit (DPI).
Continue to RIH with BHA #18.
Tagged up at top of 3-1/2" liner. PU, tag a couple of times.
Kick on pumps to 0.6 bpm, slid through ok. Continue to RIH.
Tagged up at 10580', PU tag again. SI pumps to let orienter
flop. RIH again tagged up again.
Still can't get past 10580'. PU and orient to 60R. RIH at 0.5
bpm, can't get past.
Kick pumps up to 1.7 bpm. Ream shale at 10580' with same
Printed: 1/21/2002 9:48:00 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
(
(
BPEXPLORATION
Operations. Summary Report
J-17
J-178
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Page 12 of16
Start:
Rig Release:
Rig Number:
Spud Date: 1/3/2002
End:
11/27/2001
Frorn-T d l-Iouç~Æcti&i!yC(')g~
D~scriptiopqtQperÇtti<)n$
1/16/2002 01 :50 - 02:25 0.58 STKOH N DPRB PROD1
02:25 - 02:50 0.42 STKOH N DPRB PROD1
02:50 - 04:25 1.58 STKOH N DPRB PROD1
04:25 - 04:40 0.25 STKOH N DPRB PROD1
04:40 - 05:05 0.42 STKOH N DPRB PROD1
05:05 - 05:20 0.25 STKOH N DPRB PROD1
05:20 - 06: 1 0 0.83 STKOH N DPRB PROD1
06: 1 0 - 06:25 0.25 STKOH N DPRB PROD1
06:25 - 08: 15 1.83 STKOH N DPRB PROD1
08:15 - 09:40 1.42 STKOH N DPRB PROD1
09:40 - 11 :45 2.08 STKOH N DPRB PROD1
11 :45 - 12:15 0.50 STKOH N DPRB PROD1
12:15 - 13:00 0.75 STKOH N DPRB PROD1
13:00 - 13:30 0.50 STKOH N DPRB PROD1
13:30 - 16:00 2.50 STKOH N DPRB PROD1
16:00 - 18:00
18:00 - 19:45
2.00 STKOH N
1.75 STKOH N
DFAL PROD1
DFAL PROD1
19:45 - 22:10 2.42 STKOH N DFAL PROD1
22:10 - 22:20 0.17 STKOH N DFAL PROD1
22:20 - 22:35 0.25 STKOH N DPRB PROD1
22:35 - 23:15 0.67 STKOH N DPRB PROD1
23: 15 - 23:25 0.17 STKOH N DPRB PROD1
23:25 - 00:00 0.58 STKOH N DPRB PROD1
1/17/2002 00:00 - 00:30 0.50 STKOH N DPRB PROD1
00:30 - 00:55 0.42 STKOH N DPRB PROD1
00:55 - 01 :40 0.75 STKOH N DPRB PROD1
01 :40 - 02:45 1.08 STKOH N DPRB PROD1
02:45 - 03:00 0.25 STKOH N DPRB PROD1
03:00 - 03:30 0.50 STKOH N DPRB PROD1
tool face as original well. Got thru with only a moderate
amount of work. Broke through after 20' of reaming. RIH,
tagged up, make a -15' correction to last tag.
Orient to 90L.
Tag up at 10793.6', free spin 1.7 bpm and 2730 psi. Begin
time drilling at 0.1'/6minutes. (1 fph).
10795.3', Pick up ROP to 0.1'/min, (6 fph).
10797', drilling break. ROP picked up to 100 fph, probably
sidetracked into sand. Continue at 90L tool face until
confirmed by survey.
Survey confirms we are sidetracked. ST depth was 10793'.
Orient to 30R.
Resume drilling. TF 30R, 1.7/1.7/2830 psi.
10900', PUH, backream sidetrack area fr/10810-10790'.
POOH to pick up lateral BHA.
UO motor, bit and MWD. MIU 1.1 deg motor, HYC 2.75-3.0"
Bi-center bit.
RIH with MWD BHA #19. Shallow test MWD OK.
Log tie-in with RA tag, [-14 ft CTD].
RIH. 1.71 1.7 bpm, 2700 psi, Tag TD at 11,902 ft.
Orient TF to 30R.
Drilling, 1.7 11.7 bpm, 2700 psi, TF = 30R. Weak motor.
Stalls with very little WOB. Drilled to 10,930 ft. Give up on
motor. Last incl.=85.6 deg. project 88 deg at bit. Project
landing at 8916.5 ft lVDSS.
RIG DOWN TIME. POOH FOR WEAK BHI MOTOR.
Tag up at surface. Check motor, seems fine. Look for
washouts in BHA. PT MHA to 3500 psi, ok. PT MWD monels,
2800 psi, ok. Check bleed sub, found 3/4" washout behind
nipple. CIO same. MU new motor, Hycalog Bi centered bit.
RIH with BHA #20, shallow hole test at 3500', passed ok.
Continue RIH.
Tag up at TO, correct -17' to 10930', tag from last run in the
hole. Orient to 90R .
Tag up at 10930', free spin 3250 @ 1.8 bpm, Drilling 140 fph.
10945', PU to orient. Sticky off bottom. Pulling heavy. Still
getting good returns. Pull to 60klbs. Held for 5 minutes.
Pulled free. Continue picking up. Orient to 40R
10945', resume drilling. Free spin 3100 spi at 1.75 bpm.
Drilling at 80 fph, 50R TF. lVD 8917', INC=87 deg.
Drill to 10960', getting sticky, pick up. Pull to 40klbs to get off
bottom. Probably differential sticking. Short wiper, resume
drilling.
Continue drilling from 11000'. TF 90R, 1.7/1.7/3436, 120 fph
ROP. Drilled to 11019', lost reactive, PU and was stuck.
Pulled free after 5 minutes.
11045', orient back around to 90R.
Resume drilling.
11090', Short trip to shoe, sticky pickup off bottom. No
problems anywhere else, clean at 10580' both up and down.
Orient around to 150R.
Resume drilling. 150R TF, 120 fph. Drill to 11130', pickup to
orient, clean pickup. Pulled up 20' off bottom, slowed down to
Printed: 1/21/2002 9:48:00 AM
(
(
Page< 13 of 16
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-17
J-178
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From -To ~()lJrsAGtjvityÇqdt3 NPT Phase
1/17/2002
03:00 - 03:30
0.50 STKOH N
DPRB PROD1
03:30 - 05:45
2.25 STKOH N
DPRB PROD1
05:45 - 06:30
0.75 STKOH N
DPRB PROD1
06:30 - 07:15 0.75 STKOH N DPRB PROD1
07:15 - 08:00 0.75 STKOH N DPRB PROD1
08:00 - 09:30 1.50 STKOH N DPRB PROD1
09:30 - 10:50 1.33 STKOH N DPRB PROD1
10:50 - 11 :45 0.92 STKOH N DPRB PROD1
11 :45 - 12:00 0.25 STKOH N DPRB PROD1
12:00 - 12:45 0.75 STKOH N DPRB PROD1
12:45 - 13:00 0.25 STKOH N DPRB PROD1
13:00 - 13:15 0.25 STKOH N DPRB PROD1
13:15 -14:15 1.00 STKOH N DPRB PROD1
14:15 -16:15 2.00 STKOH N DPRB PROD1
16:15 -17:30
17:30 - 18:40
1.25 STKOH N
1.17 STKOH N
DPRB PROD1
DPRB PROD1
18:40 - 19:00 0.33 STKOH N DPRB PROD1
19:00 -19:15 0.25 STKOH N DPRB PROD1
19:15 - 20:20 1.08 STKOH N DPRB PROD1
20:20 - 20:40 0.33 STKOH N DPRB PROD1
20:40 - 21 :30 0.83 STKOH N DPRB PROD1
21 :30 - 21 :40 0.17 STKOH N DPRB PROD1
21 :40 - 22:00 0.33 STKOH N DPRB PROD1
22:00 - 22:25 0.42 STKOH N DPRB PROD1
22:25 - 22:40 0.25 STKOH N DPRB PROD1
22:40 - 23:50 1.17 STKOH N DPRB PROD1
Start:
Rig Release:
Rig Number:
11/27/2001
Spud Date: 1/3/2002
End:
5 fpm to orient, and got stuck. Suspect differential sticking on
pipe.
Work pipe. Pull to 60klbs several times. SI pumps and try the
relax method. Standby for 15 minutes. Still stuck. Kick pumps
on, pull to 60klbs. Getting 1 for 1 returns. Pump to clean up
hole (bottom up vol=194 bbls), call for vac truck of crude. (90
bbls) Hold 60 klbs on coil for 20 minutes. No success. Slack
off to neutral wt while waiting for bottoms up.
Bottoms up completed. We have lost no fluid in last 1.5 hours,
and, hole is clean of cuttings. SI pump, slack off to neutral wt,
plus 6000#. Stand by for relax method again. No luck after 1/2
hour. Work pipe with pumps up and down. No luck.
Pump 20 bbl crude sweep. Displace with FloPro. Spot 10 bbls
out. Soak 10 min.
Pull free at 58K. Hole sticky. Order new FloPro.
Wiper trip to check hole conditions. Circ out crude to surface
and discard.
Drilling, 1.7 I 1.7 bpm, 2900 psi, TF = 150R. Trying to drop
inclination.
Hole sticky, Drilled to 11,205 ft.
Stuck pipe at 11200 ft. Relax. Pull 60K. No luck. Pump 15
bbls crude. Wait 10 min. Pull free at 40K.
Wiper trip to shoe. Hole clean.
Log tie-in with RA tag. Added 5 ft to CTD.
RIH to TD. Circ. in new FloPro. Tag TD at 11205 ft.
Drilling, 1.7 I 1.7 bpm, 3000 psi, TF = 170R. Drilled to 11235
ft.
Orient TF.
Stuck pipe while orienting. Relax. Work pipe up to 62K. Pull
free.
Drilling, 1.7 11.7 bpm, 2700 psi, TF = 80R. Incl = 85 deg.
Drilled to 11,341 ft.
8920 ft lVDSS. Hole not as sticky now. 27K up wt. 13K dwn
wt.
Wiper trip to window. Clean hole. RIH.
Drilling, 1.7 /1.7 bpm, 2700 psi, TF = 90R, Incl = 93 deg.
Drilled to 11,380'.
Drilling, 1.7 11.7 bpm, 2700 psi, TF = 150R, Incl = 93 deg.
Drilled to
11440', orienting to 120R. Free spin 2800 psi at 1.8 bpm.
Resume drilling. 1.8/1.8/3230 psi, 100R TF, 110 fph ROP.
11458', hole getting sticky, lets make a preventative wiper trip
to shoe. 10k Ibs over on pickup. No problems at sidetrack
depth, or shale at 10580' on trip up or down.
Orient to 120R.
Resume Drilling. TF 120R, 120 fph, taking on an additional
100 bbls on new mud.
PU to orient, clean PU. Orient to 16L
Resume drilling. TF 16L, 120 fph,
Orient
Resume drilling.
11598'. Losing push. Haveing some difficulty sliding. Make
wiper trip to shoe. 15klbs over on pickup. Slick to shoe and
Printed: 1/21/2002 9:48:00 AM
(
(
Paget4of16
BPEXPLORA TION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
1/17/2002
1/18/2002
J-17
J-178
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date
From
. Hql.Jrsj,\(;tiyi!yQpd~ NPT Phase
22:40 - 23:50
23:50 - 00:00
1.17 STKOH N
0.17 STKOH N
00:00 - 00:10
0.17 STKOH N
00: 10 - 00:25
00:25 - 01 :40
01 :40 - 02:30
0.25 STKOH N
1.25 STKOH N
0.83 STKOH N
02:30 - 03:50
1.33 STKOH N
03:50 - 04:40
04:40 - 07:00
0.83 STKOH N
2.33 STKOH N
07:00 - 07:45 0.75 STKOH P
07:45 - 08:30 0.75 STKOH N
08:30 - 09:30 1.00 STKOH P
09:30 - 09:45 0.25 CASE N
09:45 - 11 :45 2.00 CASE N
11 :45 - 13:00 1.25 CASE N
13:00 - 14:00 1.00 CASE N
14:00 - 15:30 1.50 CASE N
15:30 -16:00 0.50 CASE P
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
PROD1
DPRB PROD1
PROD1
DPRB COMP
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
PROD1
16:00 - 16:45 0.75 CASE P PROD1
16:45 - 18:30 1.75 CASE P PROD1
18:30 - 21 :30 3.00 CASE P PROD1
21 :30 - 21 :50 0.33 CASE P PROD1
21 :50 - 22:20 0.50 CASE P PROD1
22:20 - 23: 1 0 0.83 CASE P PROD1
Start:
Rig Release:
Rig Number:
11/27/2001
Spud Date: 1/3/2002
End:
Q~sc~ipti()l1qf.QpøratiØns
back.
Back at bottom, resume drilling. 1.7/1.7/3100 psi, 2700 psi free
spin. ROP=120 fph, TF40R.
Continue drilling from 11604'. 1.7/1.7/3040 psi, ROP=130fph,
TF60L.
Orient to 100L.
Resume drilling.
11721', TD'd well. Wiper trip to shoe. Clean pickup off bottom.
No problems on way up. Pulled smooth.
Log tie in pass down over gamma spike at 10031'. Make a
+10' correction.
RIH after logging.
Wiper trip smooth back to bottom. Tag TD at 11,731 ft BKB.
Final corrected depth.
POOH to run liner.
Circ pressl rate test with drilling BHA.
UO MWD BHA.
Circ. press I rate test with big hole nozzle on CT. [no BHA]
SAFETY MEETING. Review liner running procedure and
hazards.
PIU float jts, pick up 3 jts / turbos, Run 12 doubles of liner in
derrick. M/U 2 ten ft pups I turbos for marker jt and space out.
Drift all with 1.85" drift. Fill liner with water.
MIU last 17 stands of 2-3/8", 4.43#, L-80, STL liner. Drift all
connections after make up.
M/U Baker CTLRT and CTC. Pull I press test CTC.
RIH with 2-3/8" Liner. Phase 2 weather conditions. 40-50
mph wind.
0.3 bpm, 900 psi, Ran thru top of liner with no wt loss.
Stop at 10,000 ft. Up wt = 29K, Dwn wt = 15K.
RIH pumping 0.5 bpm, 1150 psi, 60 fpm. 13K dwn wt at
11 ,1 00 ft.
1 OK dwn wt at 11,600 ft. Land liner at 11,740 ft CTD.
Corrected depth =11,731'.
31.5K up wt. 10K dwn wt.
Liner went to TD with no problems. Clean hole.
Circ. 5/8" steel ball. Displace with FloPro. On seat at 32.9
bbls. Sheared at 3500 psi. Pick up, free from liner at 25K up
wt. RIH, set down 10K
Empty and clean rig pits, haul FloPro back to MI plant.
Circ. well to 2% KCL water with friction reducer. Recover
FloPro from well.
Had full returns with FloPro. When KCL water reached
formation had 50% losses.
2.2 bpm in, 1.1 bpm out, 2850 psi pump press. pump 1.6 11.0
bpm.
Well swapped over to KCL, blow remaining KCL into pits.
Only 100 bbls left. Call for another load of KCL. Circulate at
minimum rate.
Safety meeting prior to pumping cement. 16 souls on location.
Circulate at minimum rate while waiting on cementers to batch
up and driller to build biozan pill in pill pit.
Printed: 1/21/2002 9:48:00 AM
(
(
BP EXPLORATION
Operations Summary . Report
Page...15 of 16
Legal Well Name: J-17
Common Well Name: J-17B Spud Date: 1/3/2002
Event Name: REENTER+COMPLETE Start: 11/27/2001 End:
Contractor Name: NORDIC CALISTA Rig Release:
Rig Name: NORDIC 1 Rig Number:
FrOm-To t-iç:>LJr~Acti"iw GQge NPI p~scriptigrl OfQp~rCltiQn§
1/18/2002 23: 1 0 - 00:00 0.83 CASE P PROD1 Line up to cementers. Pump 3 bbls frest H2O. PT lines to
4000 psi. Passed OK. On line with cement. Pump 12.5 bbls
Class G at 15.8 ppg. Drop dart. Pump bio behind. Stopped
after 0.1 bbls, and confirmed dart away. Resume pumping
biozan. Chase dart. Dart landed in wiper plug at 40.8 bbls
(40.6 bbls coil vol). Continue to displace at 1.0 bpm. Getting
80% returns throughout job. Displace liner wiper plug to latch
collar. Landed at 48.6 bbls away (expected 48.4 bbls)
Pressure up 500 psi to confirm plug is latch. Bleed down
pressure to O. Floats held. Pressure back up to 500 psi. Sting
out of liner at 22klbs pickup. Last pickup with liner 25.5 kbls.
Pump 5 bbls of bio to contaminate cement. Pumped 12.5 bbls
cement. Got back 10.1 bbls. Expected liner annular volume
with 40% open hole excess was 9.1 bbls. Good cement job
with cement above liner top. CIP @ 00:35 1-19-2002.
1/19/2002 00:00 - 00:35 0.58 CASE P PROD1 Continue cementing liner as per description on previous
morning report. CIP @ 00:30.
00:35 - 02:00 1.42 CASE P PROD1 POOH stringing in biozan to replace voidage and contaminate
any cement left in casing.
02:00 - 02:30 0.50 CASE P PROD1 Lay down liner deployment tools. Ball is on seat in liner wiper
plug as per design. Ball not recovered.
02:30 - 04:30 2.00 CASE P PROD1 Baker NRJ and welder to attach new CTC.
04:30 - 04:50 0.33 CASE P PROD1 Safety meeting prior to making up BHA.
04:50 - 07:00 2.17 CASE P PROD1 MU clean out BHA. Mill, Motor, Discon, 34 stds CSH, discon,
ctc.
Total length = 2,130 ft.
07:00 - 08:30 1.50 CASE P PROD1 RIH with liner cleanout BHA. Circ. 1.1 bpm starting at 6200 ft.
Cement UCA sample at 1000 psi at 08:30 hrs.
08:30 - 10:00 1.50 CASE P PROD1 Ran thru top of 2-3/8" liner with no wt loss or motor work. RIH
at 30 fpm, 1.2 bpm, 2350 psi. Circ. 20 bbl very high viscosity
pill to chase any cement.
Tag PBTD of 11,663 ft BKB at 11,678 ft. Unable to drill further.
Must be at latch CLLR.
10:00 - 14:30 4.50 CASE P PROD1 POOH with cleanout BHA. Chase 20 bbl high vis pill to
surface. 1.2 bpm, 2500 psi. Full returns. Dumped cement
contaminated returns.
14:30 - 14:45 0.25 CASE P PROD1 SAFETY MEETING. Review procedures and hazards for
pulling CSH workstring.
14:45 - 16:30 1.75 CASE P PROD1 Stand back CSH workstring, recover motor and mill.
16:30 - 16:45 0.25 CASE P PROD1 SAFETY MEETING. Review procedures and hazards for
running SWS CNL/GR memory tools.
16:45 - 18:00 1.25 EVAL P PROD1 M/U SWS memory CNL/GRlCCL logging tool. RIH on 68 jts,
1" CSH workstring.
Total BHA length = 2143 ft.
18:00 - 19:00 1.00 EVAL P PROD1 Changeout and pre tour safety meeting.
19:00 - 19:50 0.83 EVAL P PROD1 Resume tripping CS Hydrill work string into hole.
19:50 - 21:15 1.42 EVAL P PROD1 RIH with memory logging tool on coil.
21 :15 - 22:30 1.25 EVAL P PROD1 Log down with CNL logging tool from 9500' @ 30 fpm.
22:30 - 23:45 1.25 EVAL P PROD1 Tag bottom at 11672' CTM, uncorrected. PUH, laying in new
flowpro mud while logging up at 30 fpm.
23:45 - 00:00 0.25 EVAL P PROD1 End up logging pass at 9500'. POOH with coil.
1/20/2002 00:00 - 01 :00 1.00 EVAL P PROD1 Continue to POOH with coil after logging memory CNL tool.
01 :00 - 01 :30 0.50 EVAL P PROD1 Tag up at surface with CTC. Stand back injector.
Printed: 1/21/2002 9:48:00 AM
("
(
Page 16 of 16
Bp.EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
J-17
J-17B
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
H()ur~AçtiyityC()pa NPT Phase
1/20/2002 01 :30 - 02:00 0.50 EVAL P
02:00 - 03:00 1.00 EVAL P
03:00 - 03:15 0.25 EVAL P
03:15 - 03:55 0.67 EVAL P
03:55 - 04:40 0.75 CASE P
PROD1
PROD1
PROD1
PROD1
COMP
04:40 - 05:00 0.33 PERF P COMP
05:00 - 06:50 1.83 PERF P COMP
06:50 - 08:15 1.42 PERF P COMP
08:15 - 10:30 2.25 PERF P COMP
10:30 - 11 :30 1.00 PERF P COMP
11:30 -14:15 2.75 PERF P COMP
14:15 -14:30 0.25 PERF P COMP
14:30 - 15:30 1.00 PERF P COMP
15:30 - 15:45 0.25 PERF P COMP
15:45 - 17:00 1.25 PERF P COMP
17:00 - 18:00 1.00 PERF P COMP
18:00 - 18:30 0.50 PERF P COMP
18:30 - 19:30 1.00 PERF P COMP
19:30 - 20:20 0.83 PERF P COMP
20:20 - 20:45 0.42 PERF P COMP
20:45 - 21 :15 0.50 PERF P COMP
21 :15 - 21 :45 0.50 PERF P COMP
21 :45 - 22:15 0.50 PERF P COMP
22:15 - 23:30 1.25 PERF P COMP
23:30 - 23:45 0.25 PERF P COMP
23:45 - 00:00 0.25 PERF P COMP
Start:
Rig Release:
Rig Number:
Spud Date: 1/3/2002
End:
11/27/2001
pescriptioqqf Qp~rati()n~
Safety meeting prior to pulling CSH. Kick drill.
Stand back CSH.
Safety meeting prior to pulling radioactive logging tool.
Lay down CNL tool
Pressure test liner lap cement job. Pressure up to 2000 psi at
surface, hold for 1/2 hour. Pressure 1930 psi after 30 minutes.
Good PT of liner lap cement.
Recorded on press chart.
Safety meeting prior to picking up perf guns.
MIU 350 ft of SWS, 1.56", Power Jet perf guns at 4 SPF. 3.4
gm charges,
0.19" entrance hole, 10.7" penetration.
RIH with 56 jts, CSH workstring.
RIH with perf guns. Circ. 0.2 bpm at 70 psi. Tag PBTD at
11675 ft CTD, correct CTD to 11,663 ft BKB, correct PBTD
from CNUGR/CCL and liner tally.
Pump 8 bbls high vis FloPro, insert 0.5" steel ball, Displace
ball with 2% KCL water, 1.3 bpm, 2500 psi. Position bottom
perforating charge at 11,650 ft.
Ball on seat at 39.7 bbls, firing head sheared at 2450 psi.
PERFORATED INTERVAL: 11,300 - 11,650 FT BKB
POOH with perf guns. 0.5 bpm, 380 psi.
SAFETY MEETING. Review procedure and hazards to stand
back CSH in doubles.
Stand back CSH in doubles.
SAFETY MEETING. Review procedure and hazards to recover
shot perf guns.
Layout SWS perf guns. ALL SHOTS FIRED.
RIH with 1" CSH in stands and layout in singles. Offload 1"
CSH workstring from pipe shed into pipe basket.
SD for crew change and safety meeting prior to resuming
pulling 1" CSH.
Resume laying down 1" CSH.
Lay down CSH handling eq and tubing.
MU 2" nozzle and stingers to RIH and FP well. MU injector to
tree.
RIH to FP well.
Wait at 2000', Circ 30 bbls of neat meth to nozle.
POOH from 2000', laying in methanol at 50%, lay in neat
methanol above 500'.
Rig down injector and BOP stack. Rig released at 23:30
1-20-02
RU N2 pumper to blow down coil. Hold PJSM for N2 pumpers.
PT hardline.
Printed: 1/21/2002 9:48:00 AM
(
::2).'.'.:':';"~~I;I:!!I:"."...".~.'...": ... .:~....: "'ili,I........ ..,
cji11'f:!:j~t¡~~,:"lifJt/o'S1' I I
(
12-Feb-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well J-17B
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,000.00' MD
Window / Kickoff Survey 10,021.00' MD (if applicable)
Projected Survey: 10,513.68' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
FEB 2. 0 2002
AtalkaOil&Ga8Cons.CQIIInIIiOn
Anctøa9Ð
Attachment(s)
-
(
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA J Pad, SlotJ-17
J-178
Job No. AKMW20003, Surveyed: 9 January, 2002
SUR VEY R EPO R T
11 February, 2002
"-
(
Your Ref: 500292096902
Surface Coordinates: 5970534.00 N, 642547.00 E (70° 19' 37.3006" N, 148° 50' 38.2163" W)
Surface Coordinates relative to Project H Reference: 970534.00 N, 142547.00 E (Grid)
Surface Coordinates relative to Structure Reference: 2282.11 N, 1436.36 E (True)
Kelly Bushing: 77.00ft above Mean Sea Level
spar"r"y-sul!
DRILLING SIiiiRVIC&&
A Halliburton Company
Survey Ref: svy11098
. "'~~~.~~:~ ~. .
Sperry-Sun Drilling Services
Survey Report for J-17B
Your Ref: 500292096902
Job No. AKMW20003, Surveyed: 9 January, 2002
Alaska Drilling & Wells
North Slope Alaska PBU_WOA J Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (a/100ft)
10000.00 40.670 118.900 8314.60 8391.60 1403.95 S 4123.69 E 5969208.64 N 646696.62 E -2058.38 Tie-on Point
MWD Magnetic
10021.00 40.370 120.130 8330.56 8407.56 1410.67 S 4135.56 E 5969202.15 N 646708.62 E 4.065 -2062.48 Window Point
10054.58 40.250 126.000 8356.18 8433.18 1422.51 S 4153.75 E 5969190.66 N 646727.03 E 11.311 -2067.71
10084.73 39.990 132.000 8379.24 8456.24 1434.73 S 4168.84 E 5969178.73 N 646742.34 E 12.849 -2070.41 (
10116.80 36.300 138.000 8404.47 8481.47 1448.69 S 4182.86 E 5969165.04 N 646756.62 E 16.297 -2071.15
10146.96 32.860 144.000 8429.30 8506.30 1461.95 S 4193.65 E 5969151.99 N 646767.66 E 16.038 -2069.99
10173.75 31.570 149.000 8451.97 8528.97 1473.84 S 4201.53 E 5969140.25 N 646775.77 E 11.050 -2067.65
1 0201 . 19 28.600 154.440 8475.72 8552.72 1485.93 S 4208.07 E 5969128.29 N 646782.54 E 14.685 -2064.18
10234.01 26.700 156.670 8504.79 8581.79 1499.79 S 4214.38 E 5969114.55 N 646789.11 E 6.591 -2059.35
10282.76 27.600 151.910 8548.17 8625.17 1519.81 S 4224.03 E 5969094.71 N 646799.15 E 4.821 -2052.76
10305.56 27.170 156.850 8568.42 8645.42 1529.26 S 4228.57 E 5969085.35 N 646803.86 E 10.140 -2049.63
10346.76 26.630 168.250 8605.19 8682.19 1546.96 S 4234.15 E 5969067.76 N 646809.78 E 12.570 -2041.64
10381.08 26.630 174.410 8635.87 8712.87 1562.15 S 4236.4 7 E 5969052.62 N 646812.38 E 8.042 -2032.97
10411.28 29.360 182.140 8662.54 8739.54 1576.29 S 4236.85 E 5969038.49 N 646813.03 E 15.019 -2023.61
10452.41 35.330 184.600 8697.28 8774.28 1598.24 S 4235.52 E 5969016.52 N 646812.12 E 14.861 -2007.67
10479.18 38.140 186.360 8718.73 8795.73 1614.17 S 4233.98 E 5969000.56 N 646810.88 E 11 .208 -1995.67
10513.68 42.190 184.250 8745.09 8822.09 1636.32 S 4231.94 E 5968978.37 N 646809.26 E 12.383 -1979.08 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
Magnetic Declination at Surface is 26.3910 (05-Jan-02) (
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well Reference and calculated along an Azimuth of 227.000° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 10513.68ft.,
The Bottom Hole Displacement is 4537.28ft., in the Direction of 111.140° (True).
. "h.. ._--...~._-~_._.__.~-._----_.-."'_._,,. .
-------- ----'..- .-
11 February, 2002 - 11 :08
Page 2 of3
DrlllQuest 2.00.09.008
Spérry-Sun Drilling Services
Survey Report for J-178
Your Ref: 500292096902
Job No. AKMW20003, Surveyed: 9 January, 2002
.
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA J Pad
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northlngs Eastlngs
(ft) (ft) (ft)
Comment
10000.00
10021.00
10513.68
8391.60
8407.56
8822.09
1403.95 S
1410.67 S
1636.32 S
4123.69 E
4135.56 E
4231.94 E
Tie-on Point
Window Point
Projected Survey
(
Survey tool program for J-178
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
10000.00
0.00 10000.00
8391.60 10513.68
8391.60 AK-1 BP _HG - BP High Accuracy Gyro (J-17)
8822.09 MWD Magnetic (J-17B)
(
. ,...,....,,,.-... ""'--'.._"-'''''''~---'
-.-..,---. ._.
11 February, 2002 - 11 :08
Page30f3
DrlllQuest 2.00.09.008
(
BP Amoco
Baker Hughes INTEQ Survey Report
(
Biii8
BAJŒa
HUGIIIS
lNTEQ
ObP
Company: BP Amoco
Field: Prudhoe Bay
Site: PB J Pad
Well: J-17
Wellpath: J-17B
Date: 2/12/2002 Time: 15:58:41
Co-ordinate(NE) Reference: Well: J-17, True North
Vertical (TVD) Reference: 27: 177/1/198300:0077.0
Section (VS) Reference: Well (0.00N,O.00E,227.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Page:
Field:
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
PB J Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5968224.22 ft
641155.79 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 19 14.845 N
148 51 20.092 W
True
1.08 deg
Site:
J-17
J-17
Well Position:
Slot Name:
17
Well:
+N/-S 2283.38 ft Northing: 5970534.00 ft
+E/-W 1434.51 ft Easting: 642547.00 ft
Position Uncertainty: 0.00 ft
Latitude:
Longitude:
70 19 37.301 N
148 50 38.216 W
Wellpath: J-17B
500292096902
Current Datum: 27: 177/1/198300:00
Magnetic Data: 1/14/2002
Field Strength: 57494 nT
Vertical Section: Depth From (TVD)
ft
0.00
Height 77.00 ft
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
J-17BPB1
10700.00 ft
Mean Sea Level
26.38 deg
80.80 deg
Direction
deg
227.00
Survey:
MWD
Start Date:
1/18/2002
Company: Baker Hughes INTEQ
Tool: MWD,MWD - Standard
Engineer:
Tied-to:
From: Definitive Path
Annotation
MD TVD
ft ft
10700.00 8926.23
11731.00 8998.79
KOP
TO
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE DLS VS
,ft deg deg ft ft ft ft ft ft deg/1000 ft
10700.00 63.29 198.84 8926.23 8849.23 -1788.48 4229.28 5968826.32 646809.17 0.00 -1873.36
10743.47 65.92 205.35 8944.89 8867.89 -1824.83 4214.50 5968789.71 646795.08 14.82 -1837.76
10783.78 67.41 213.43 8960.88 8883.88 -1857.03 4196.34 5968757.16 646777.54 18.77 -1802.52
10797.00 68.99 212.03 8965.79 8888.79 -1867.36 4189.71 5968746.71 646771.10 15.48 -1790.62
10829.70 70.75 201.83 8977.07 8900.07 -1894.69 4175.84 5968719.12 646757.76 29.77 -1761.84
10867.45 78.84 209.56 8986.98 8909.98 -1927.44 4160.03 5968686.08 646742.57 29.14 -1727.94
10903.73 85.61 213.08 8991.88 8914.88 -1958.13 4141.35 5968655.05 646724.48 20.99 -1693.35
10939.12 87.63 220.11 8993.97 8916.97 -1986.47 4120.30 5968626.32 646703.98 20.63 -1658.63
10980.35 92.55 224.68 8993.91 8916.91 -2016.90 4092.52 5968595.37 646676.78 16.28 -1617.56
11009.15 93.96 231.01 8992.27 8915.27 -2036.19 4071.22 5968575.68 646655.85 22.48 -1588.82
11049.50 92.55 238.39 8989.98 8912.98 -2059.45 4038.36 5968551.80 646623.44 18.59 -1548.93
11083.73 92.02 243.67 8988.61 8911.61 -2076.01 4008.45 5968534.67 646593.85 15.49 -1515.76
11104.72 89.74 246.13 8988.29 8911.29 -2084.91 3989.44 5968525.41 646575.02 15.98 -1495.79
11148.52 89.21 252.10 8988.69 8911.69 -2100.52 3948.54 5968509.03 646534.43 13.68 -1455.23
11180.45 90.35 258.78 8988.81 8911.81 -2108.54 3917.66 5968500.43 646503.70 21.22 -1427.17
11218.52 86.04 260.19 8990.01 8913.01 -2115.48 3880.25 5968492.78 646466.44 11.91 -1395.08
11236.92 84.55 260.19 8991.52 8914.52 -2118.61 3862.19 5968489.31 646448.44 8.10 -1379.74
11267.65 85.87 265.46 8994.09 8917.09 -2122.43 3831.81 5968484.91 646418.15 17.62 -1354.92
(
(
llíi8
BAKU.
HUGHES
----.--.--..----,-
INTEQ
ObP
BP Amoco
Baker Hughes INTEQ Survey Report
Company: BP Amoco
Field: Prudhoe Bay
Site: PB J Pad
Well: J-17
Wellpath: J-17B
Date: 2/12/2002 Time: 15:58:41
Co-ordinate(NE) Reference: Well: J-17, True North
Vertical (fVD) Reference: 27: 17 7/1/1983 00:00 77.0
Section (VS) Reference: Well (0.00N,O.00E,227.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Page:
2
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE DLS VS
ft deg deg ft ft ft ft ft ft deg/1000 ft
11311.45 86.92 272.14 8996.84 8919.84 -2123.34 3788.14 5968483.17 646374.50 15.41 -1322.35
11338.92 92.02 275.66 8997.10 8920.10 -2121.47 3760.74 5968484.52 646347.08 22.56 -1303.59
11398.52 92.55 285.85 8994.72 8917.72 -2110.38 3702.31 5968494.50 646288.45 17.11 -1268.43
11429.07 89.30 289.72 8994.22 8917.22 -2101.05 3673.24 5968503.27 646259.21 16.54 -1253.52
11467.85 85.96 294.64 8995.83 8918.83 -2086.43 3637.37 5968517.21 646223.07 15.32 -1237.26
11521.23 86.48 295.35 8999.35 8922.35 -2063.92 3589.10 5968538.79 646174.38 1.65 -1217.31
11553.45 91.05 293.94 9000.04 8923.04 -2050.50 3559.83 5968551.66 646144.87 14.84 -1205.06
11593.60 91.05 288.67 8999.30 8922.30 -2035.92 3522.44 5968565.52 646107.21 13.12 -1187.66
11639.90 90.70 284.80 8998.60 8921.60 -2022.59 3478.12 5968578.01 646062.64 8.39 -1164.33
11665.80 89.74 282.69 8998.50 8921.50 -2016.43 3452.96 5968583.68 646037.38 8.95 -1150.13
11731.00 89.74 282.69 8998.79 8921.79 -2002.11 3389.35 5968596.79 645973.51 0.00 -1113.38
BP Amoco
WELLPATH DETAILS
J-17B
500292096902
Parent Wellpath:
Tie on MD:
J-17BPB1
10700,00
Rig:
Ref, Datum:
Nordic t
27: 17 711/1983 00:00
nooft
V,Section
Angle
227,00°
Origin
+N/-S
0,00
0,00
Origin
+E/-W
Starting
From TVD
0,00
REFERENCE
Co-ordinate (N/E) [',eference: Well Centre J-17, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference' Slot - 17 (O,OON,O,OOE)
Measured Depth Reference: 27,177/1/198300:00 77,00
Calculation Method: Minimum Curvature
ANNOTATIONS
C
~-1400
::
0
0-1500
....
....
...-..-1600
+
:ï::-1700
t:
0
~ -1800
'7'
:ï::-1900
""'
~ -2000
en
-2100
Wellpalh (J-17/J-17B)
TVO
MO Aeeolalloe
to True North
North: 26,38'
Magnetic Field
Strength 57494nT
Dip Angle: 80,80°
Date: 1/14/2002
Model: BGGM2001
Cceated By Be; Poleis
Dale 211212002
8849,23 10700,00 KOP
8 9 2 1 7 9 1 173 1 ,0 0 TO
8300
8350
8400
8450
.....
c:
;¡;¡8500
....
0
1.08550
....
:58600
Q.
Q
1:18650
~8700
~8750
:>
Q 8800
::!
...
¡.. 8850
8900
8950
9000
9050
-900
-1000
-1100
-1200
-1300
-2200
-2300
-2400
-2500
240025002600270028002900300031003200330034003500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000
West(-)/East(+) [100ft/in]
-2400-2350-2300-2250-2200-2150-2100-2050-2000-1950-1900-1850-1800-1750-1700-1650-1600-1550-1500-1450-1400-1350-1300-1250-1200-1150-1100-1050-1000 -950 -900 -850 -800 -750 -700 -650 -600 -550 -500 -450
Vertical Section at 227.00. [50ft/in]
(
ObP
BP Amoco
Baker Hughes INTEQ Survey Report
(
1I¡¡¡8
BAJŒa
HUGHES
~----
INTEQ
Company: BP Amoco
Field: Prudhoe Bay
Site: PB J Pad
Well: J-17
Well path: J-17BPB1
Date: 2/12/2002 Time: 15:53:44
Co-ordinate(NE) Reference: Well: J-17, True North
Vertical (TVD) Reference: 27: 17 7/1/1983 00:00 77.0
Section (VS) Reference: Well (0.00N,0.00E,120.16Azi)
Survey Calculation Method: Minimum Curvature Db:
Page:
Oracle
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Field:
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
Site:
PB J Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5968224.22 ft
641155.79 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 19 14.845 N
148 51 20.092 W
True
1.08 deg
Well:
J-17
J-17
Well Position:
Slot Name:
17
+N/-S 2283.38 ft Northing: 5970534.00 ft
+E/-W 1434.51 ft Easting: 642547.00 ft
Position Uncertainty: 0.00 ft
Latitude:
Longitude:
70 19 37.301 N
148 50 38.216 W
Wellpath: J-17BPB1
500292096970
Current Datum: 27: 177/1/198300:00
Magnetic Data: 1/14/2002
Field Strength: 57494 nT
Vertical Section: Depth From (TVD)
ft
0.00
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
J-17
10021.00 ft
Mean Sea Level
26.38 deg
80.80 deg
Direction
deg
120.16
Height 77.00 ft
MWD
Initial Surveys by Sperry Sun
Company: Baker Hughes INTEQ
Tool: MWD,MWD - Standard
Start Date:
1/12/2002
Survey:
Engineer:
Tied-to:
From: Definitive Path
Annotation
MD TVD
ft ft
10021.00 8407.56
11616.00 8995.95
KOP
TO
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE DLS VS
ft deg deg ft ft ft ft ft ft deg/10aft ft
10021.00 40.37 120.13 8407.56 8330.56 -1410.59 4135.83 5969202.34 646708.57 0.00 4284.68
10054.58 40.25 126.00 8433.18 8356.18 -1422.43 4154.02 5969190.85 646726.98 11.31 4306.35
10084.73 39.99 132.00 8456.24 8379.24 -1434.64 4169.11 5969178.93 646742.29 12.85 4325.53
10116.80 36.30 138.00 8481.47 8404.47 -1448.60 4183.13 5969165.24 646756.57 16.30 4344.67
10146.96 32.86 144.00 8506.30 8429.30 -1461.86 4193.92 5969152.19 646767.61 16.04 4360.66
10173.75 31.57 149.00 8528.97 8451.97 -1473.76 4201.80 5969140.44 646775.72 11.05 4373.45
10201.19 28.60 154.44 8552.72 8475.72 -1485.84 4208.34 5969128.49 646782.48 14.68 4385.18
10234.01 26.70 156.67 8581.79 8504.79 -1499.70 4214.65 5969114.75 646789.05 6.59 4397.60
10293.09 27.51 152.26 8634.39 8557.39 -1523.97 4226.26 5969090.71 646801.12 3.67 4419.82
10348.32 26.46 165.27 8683.65 8606.65 -1547.18 4235.33 5969067.68 646810.63 10.84 4439.33
10400.17 29.36 177.92 8729.50 8652.50 -1571.08 4238.73 5969043.85 646814.49 12.69 4454.28
10431.07 33.40 180.03 8755.88 8678.88 -1587.16 4239.01 5969027.77 646815.07 13.55 4462.59
10463.36 37.18 178.98 8782.23 8705.23 -1605.81 4239.17 5969009.13 646815.59 11.86 4472.11
10489.91 40.69 175.46 8802.88 8725.88 -1622.47 4240.00 5968992.50 646816.73 15.62 4481.19
10517.01 42.10 175.81 8823.21 8746.21 -1640.34 4241.37 5968974.66 646818.44 5.27 4491.35
10559.06 50.19 176.17 8852.32 8775.32 -1670.56 4243.48 5968944.48 646821.12 19.25 4508.36
10581.06 53.79 178.63 8865.86 8788.86 -1687.87 4244.25 5968927.19 646822.23 18.58 4517.73
10611.31 56.95 181.79 8883.06 8806.06 -1712.75 4244.15 5968902.31 646822.59 13.53 4530.14
(
ObP
BP Amoco
Baker Hughes INTEQ Survey Report
.(
(
iii..
BAKD
HUGIIIS
----
INTEQ
Company: BP Amoco
Field: Prudhoe Bay
Site: PB J Pad
Well: J-17
Wellpath: J-17BPB1
Date: 2/12/2002 Time: 15:53:44
Co-ordinate(NE) Reference: Well: J-17, True North
Vertical (fVD) Reference: 27: 17 7/1/1983 00:00 77.0
Section (VS) Reference: Well (0.00N,O.00E,120.16Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Page:
2
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE DLS VS
ft deg deg ft ft ft ft ft ft deg/1000 ft
10643.06 60.47 189.88 8899.56 8822.56 -1739.70 4241.36 5968875.32 646820.32 24.42 4541.26
10682.73 62.84 195.15 8918.41 8841.41 -1773.76 4233.78 5968841 .12 646813.39 13.13 4551.82
10714.11 63.72 201.83 8932.53 8855.53 -1800.32 4224.89 5968814.40 646805.01 19.22 4557.48
10746.88 65.74 207.10 8946.52 8869.52 -1827.28 4212.62 5968787.22 646793.25 15.79 4560.41
10783.78 67.41 213.43 8961.21 8884.21 -1856.49 4195.55 5968757.69 646776.74 16.38 4560.33
10814.98 70.93 216.60 8972.30 8895.30 -1880.36 4178.82 5968733.51 646760.47 14.75 4557.86
10845.69 74.71 219.76 8981.37 8904.37 -1903.41 4160.68 5968710.12 646742.77 15.75 4553.75
10885.47 78.93 224.68 8990.45 8913.45 -1932.07 4134.66 5968680.97 646717.30 16.05 4545.65
10917.74 79.98 230.31 8996.36 8919.36 -1953.50 4111.28 5968659.11 646694.33 17.46 4536.20
10952.97 81.12 234.88 9002.14 8925.14 -1974.60 4083.68 5968637.49 646667.14 13.20 4522.94
10984.00 86.75 237.34 9005.42 8928.42 -1991.79 4058.08 5968619.81 646641.87 19.78 4509.44
11017.37 94.66 237.34 9005.01 8928.01 -2009.78 4030.01 5968601.29 646614.15 23.70 4494.21
11051.87 94.13 245.07 9002.36 8925.36 -2026.34 3999.89 5968584.17 646584.35 22.39 4476.48
11085.27 92.81 251.75 9000.34 8923.34 -2038.60 3968.90 5968571.33 646553.61 20.35 4455.85
11119.94 93.34 257.73 8998.48 8921.48 -2047.71 3935.52 5968561.58 646520.41 17.29 4431.56
11150.39 93.08 263.00 8996.77 8919.77 -2052.79 3905.56 5968555.93 646490.55 17.30 4408.21
11188.92 89.91 267.22 8995.77 8918.77 -2056.07 3867.19 5968551 .92 646452.26 13.69 4376.69
11223.70 90.35 272.14 8995.69 8918.69 -2056.27 3832.43 5968551.07 646417.50 14.20 4346.72
11261 .95 92.02 279.52 8994.90 8917.90 -2052.39 3794.41 5968554.22 646379.42 19.78 4311.90
11306.95 90.26 284.45 8994.00 8917.00 -2043.05 3750.41 5968562.73 646335.26 11.63 4269.17
11345.09 89.47 278.47 8994.09 8917.09 -2035.47 3713.05 5968569.59 646297.76 15.82 4233.06
11383.27 88.15 275.66 8994.88 8917.88 -2030.78 3675.18 5968573.56 646259.81 8.13 4197.95
11421.25 85.78 272.14 8996.89 8919.89 -2028.20 3637.35 5968575.42 646221.94 11.16 4163.94
11460.07 88.77 271.79 8998.74 8921.74 -2026.87 3598.60 5968576.02 646183.17 7.75 4129.77
11490.62 91.32 273.90 8998.72 8921.72 -2025.35 3568.09 5968576.95 646152.65 10.83 4102.63
11535.90 91.14 278.82 8997.74 8920.74 -2020.34 3523.11 5968581.11 646107.58 10.87 4061.23
11566.32 91.32 284.45 8997.09 8920.09 -2014.21 3493.34 5968586.67 646077.70 18.51 4032.40
11616.00 91.32 284.45 8995.95 8918.95 -2001.81 3445.24 5968598.15 646029.38 0.00 3984.59
--- "~-''''_''_''R"_~_-'--''-""' -.".-.-,. -_..".,,"--'~-,-,,~-,,","- ,-.-.. " --,--._._.__n_._..." -... ..-......"""-_..."_n,._.,,.-.. - " ~ -.--,.,,---.-.----. .-_... "...~",,_._,,--.'-"'--'-" "--.. -- .--.,..-- .--~ -'--""."', ."~--,,_..__.m__,,,,~. -",-,.."""'.-,,,,.-....-..-'---',."'- - n- '-'-'..--_.m_''''_--'-'-'-'.,.,,-- ---. ...-.'-" """'-" "h._."......--,,-........," -". -..~.." ---- ..-..,,--,.--
02/19/02
Sc~lumbepgep
NO. 1826
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherñe
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Altn: Lisa Weeple
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
(
Well
Job #
Log Description
Date
BlueUne
Sepia
Color
Prints
CD
(
J-17B ~DJ"dd.,.l/. 22065 MCNL 01/20/02 1 1 1
NK-19A ~O 1- 07 0 22041 SCMT (PDC) 01/22/02 2 1
D.S. 4-19A ~ D -d) 9' 22061 SCMT (PDC) 01/10/02 2 1
-
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc,
Petrotectnical Data Center LR2-1
900 E, Benson Blvd.
Anchorage, Alaska 99508
RECEIVED
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrle
Rece~ (. Ckp.. )
Date Delivered:
t1AR 0 5 2002
A1às1èaOiI & Gas Cons. Commi8sion
Anchorage
(
~1f~1fŒ (ill~ ~~~~[K{~
('
AlASKA OIL A1WD.GAS
CONSERVATION COMMISSION /
TONY KNOWLES, GOVERNOR
333 W. -rrn AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Ted Stagg
Ct Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage AK 99519
Re:
Prudhoe Bay Unit J-17B
BP Exploration (Alaska) Inc.
Pennit No: 201-224
Sur Loc: 801' SNL, 1806' WEL, Sec. 09. TIIN, RI3E, UM
Btmhole Loc. 2864' SNL, 1585' EWL, Sec. 10, TIIN, R13E, UM
Dear Mr. Stagg:
Enclosed is the approved application for pennit to redrill the above referenced well.
The pennit to redrill does not exempt you from obtaining additional pennits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required pennitting detenninations are made.
Annular disposal has not been requested as part of the Pennit to Drill application for Prudhoe
Bay Unit J-17B.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Cw~ik,U'W
Cammy ~echsli T~yiðr
Chair
BY ORDER OF THE COMMISSION
DATED this 30th day of November, 2001
jj c/Enclosures
cc:
Department of Fish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
ALASKA o(
STATE OF ALASKA {
\ND GAS CONSERVATION COMMI~~(vN
PERMIT TO DRILL
20 AAC 25.005
.:{
X\'^ \ . "\"0\
\'" U
1
\ \ ,~
t lYèT ,
1 a. Type of work 0 Drill II Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
801' SNL, 1806' WEL, SEC. 09, T11 N, R13E, UM
At top of productive interval
2225' SNL, 26611 EWL, SEC. 10, T11 N, R13E, UM
At total depth
2864' SNL, 1585' EWL, SEC. 10, T11N, R13E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL 028284,2415' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 10040' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casin Grade Cou lin
3~1/2" L~80 ST~L
2-3/8" L-80 ST-L
0 Exploratory 0 ~tratigraphic Test II Development Oil
0 Service 0 Development Gas [dSingl one 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
KBE = 76.98' Prudhoe Bay Field 1 Prudhoe
6. Property Designation Bay Pool
ADL 028281
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
J~ 17B
9. Approximate spud date
12/24/01 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 11626' MD 1 8930' TVDss
17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
91 0 Maximum surface 2244 psig, At total depth (TVD) 8800' 1 3300 psig
Setting Depth
To Bottom
. MD TVD MD TVD
9740' 8116' 10100' 8391'
9690' 807T 11626' 8930'
11. Type Bond (See 20 AAC 25.025)
1 b. Type of well
Number 2S1 00302630~277
Hole
3~3/4"
3"
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Junk (measured)
Plugs (measured)
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20"x 30" 8 cu yds Concrete 110' 110'
Surface 26491 13-3/8" 3856 cu ft Arcticsèt III & II 2685' 26851
Intermediate
Production 9927' 9~5/8" 2360 cu ft Class IG', 132 cu ft PF 9963' 8364'
Liner 132T 7" 492 cu ft Class IG' 9713' - 10252' 8172' - 8585'
Liner 2~7/8" 90 cu ft Class IG' 97~~f;1:,~055'
true vertical
11180' - 11224', 112751 ~ 11365'
8985' - 8996', 9009' ~ 9033'
NOV 1 6 2001
Perforation depth: measured
II Filing Fee 0 Property Plat 181 BOP Sketch
181 Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis
Contact Engineer Name/Number: Ted Stagg, 564-4694
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Ted Stagg Title CT Drilling Engineer
Ala8k80i1 & Gas ConS. Commission
0 Diverter Sketch 0 Drilling
0 Seabed Report 0 20 AAC 25.050 Requirements
Prepared By Name/Number: Terrie Hubble, 564-4628
20. Attachments
Permit Number
26/'~ 22.'
Conditions of Approval:
Approv, t See cover letter
~ for other re uirements
Mud Log Re uire 0 Yes B No
Directional Survey Required 6a:Yes 0 No
D4K D5K D10K 0 15K ~.5K psi for CTU
API Number
50~ 029~20969~02
Samples Required 0 Yes ~o
Hydrogen Sulfide Measures $:fYes 0 No
Required Working Pressure for BOPE 0 2K 0 3K
Oth"riginal Signed By
Camm
issioner
by order of
the commission
Date
Rev. 12~01~85
('
(
BP
J-17b Sidetrack
Summarv of ODerations:
A CTD through tubing sidetrack is planned for well J-17a. The coil sidetrack, J-17b, will exit the 7" liner in
the Kingak formation and target Zone 2. Existing perfs in the J-17a liner will be isolated with a cast iron
bridge plug set in the 2 7/8". The existing 2 7/8" liner will be cut and recovered just above top of cement in
the Kingak interval. A mechanical whipstock will be used to exit the 7" .
A 3.75" hole will be drilled through the Kingak and into the Sag River formation. A 3.5" liner will then be run
and cemented. This drilling liner will then be milled out and 3" hole drilled to TD in Zone 2. The production
liner will be a fully cemented 2 3/8" string.
Phase 1: Prep work. Planned for Dec. 3, 2001.
1. E-line will set and test a cast iron bridge plug inside the existing 2 7/8" liner to isolate J-17a perfs.
2. E-line will chemically cut the 2 7/8" at approx. 10058'MD (8359ss) just above the top of Sag R.
3. Service coil will pull and lay down the severed 2 7/8" liner.
4. Service coil will underream the 7" liner across the intended whipstock interval.
5. E-line will set a mechanical whipstock at approx. 10034'MD (8341 ss).
Phase 2: Mill window, Drill and Complete sidetrack: Planned for Dec. 24, 2001.
Drilling coil will be used to mill the window then drill and complete the directional hole as per attached
plan. A 3.5" drilling liner will be set across the Kingak with the shoe in the Sag R. The production
liner will be cemented from TD to the top of the 2 3/8" liner at 9690'MD (8077ss).
Mud Program:
. Phase 1: Seawater
. Phase 2: Mill with seawater/biozan, drill with Flo-Pro (8.6 - 8.7 ppg)
Disposal:
. All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program:
. The 3.5" drilling liner shoe will be at approx. 10,100'MD (8391ss). Top of 3.5" liner will be at 9740'MD
(8116ss). Cement volume will be 10 bbls, minimum. The shoe of this liner will be milled out for further
drilling.
. The 2 3/8" production liner will be cemented from TD, (11,626' MD, 8930ss), to the top of the liner at
approx. 9690'MD (8077ss). Cement volume will be 20 bbls minimum.
. The 2 3/8" liner will be selectively perforated.
Well Control:
. BOP diagram is attached.
. Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
. The annular preventer will be tested to 400 psi and 2500 psi.
Directional
. See attached directional plan. Max. planned hole angle is 91 deg.
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
. An MWD Gamma Ray log will be run over all of the open hole section.
. A Memory CNL will be run in the cased hole.
Hazards
.
The highest H2S recorded to date on J-Pad was 60 ppm on 9/20/00..
Crossing one faults, with high risk of lost circulation.
.
(
(.
.
A short section of Kingak will be drilled. Sloughing shale is a risk.
Reservoir Pressure
Res. press. is estimated to be 3300 psi at 8800'ss (7.2ppg emw). Max. surface pressure with gas (0.12
psi/ft) to surface is 2244psi.
TREE =
('
SAFElY NOlES: WELLANGLE>70 deg@ 10700'.
6" We BlOY
WELLHEAD = WeBlOY
Acn.1A. TOR = OTIS
KB. B..BI = 76.78'
BF. ELBI = 39.78'
KOP= 3000'
Max Angle = 77 @ 10765'
Datum MD = 1 0774'
DatumTVD = 8800' SS
9-5/8" OJ A<R
13-3/8" CSG, 72#, 10 = 12.347"
Minimu m ID= 2.372" @ 9737'
Top of 2-718"
J-17A
8
I I
5-112" TBG, 17#, L-80, .0232 bpf, 10 = 4.892"
TOP OF 2-7/8" LNR, 6.16#, 10 = 2.372"
4-1/2"TBG, 12.6#, L-80, .0152 bpf, 10 =3.958"
9-5/8" CSG, 47#, L-80, 10 = 8.671"
PERFORATION SIJIJ1I\N\RY
REF LOG: MQ\JLlGR ON 10(25/99
ANGLEA TTOP PffiF: 76 @ 11180'
I\bte: Refer to A"oductbn œ for historical rf data
SIZE SA= INTffiVAL 0 n/ z DATE
2" 6 11180-11210 0 10/08/00
2" 6 11275-11305 0 10/07/00
2" 6 11204-11224 0 05/15/00
2" 4 11275-11325 0 11/07/99
2" 4 11321-11365 0 10/26/99
7" LNR, 26#, L-80, BlRS, 10 = 6.276"
11040'
(
ST fvD TVD
13 3149 3067
12 5074 4610
11 6476 5603
10 7171 6094
9 7322 6204
8 7806 6564
7 7962 6689
6 8276 6947
5 8434 7077
4 8751 7332
3 8907 7453
2 9353 7805
1 9509 7931
5-1/2" CAMoo SSSVN,10 =4.562"
GAS LIFT MANDRELS
OBI TYPE VLV LATO-1 PORT DATE
12 OTIS LBO RA
43 OTIS LBO RA
45 OTIS LBO RA
44 OTIS LBO RA
43 OTIS LBO RA
40 OTIS LBO RA
35 OTIS LBO RA
34 OTIS LBO RA
34 OTIS LBO RA
38 OTIS LBO RA
38 OTIS LBO RA
38 OTIS LBO RA
38 OTIS LBO RA
9582'
5-1/2" BKR L SLIDING SL V, 10 = 4.313"
BOT SBR W/3.813" X FROFILE
9-518" BOT 3H PKR, 10 = 3.958"
4-1/2" 011S XN NIP, 10 = 3.80"
T' MLLOUT WNDOW
10252' - 10259' (OFF WHPSTOO<)
2-7/8" LNR, 6.18#, L-80, .0058 bpf, 10 = 2.441"
DATE REV BY ooM'v1ENTS 06.lE REV BY COMMENTS
07/18/83 NIT\L\ L CO~LETION
1 0/26/99 JLH cm SIDETRA 0<
11/16100 SIS- L G 00 N\I ffiTED TO r:A N\I A S
01/26/01 SIS- L G REVISION
1 0/03/01 Rt\VTP ooRRECTIONS
FRLDHOE BA Y UNIT
WB..L: J-17 A
PERMIT No: 199-0920
PERMIT No: 50-029-20969-01
801' SNL & 1806' WEL, Sec. 9, T11 N, R13E,
BP Exploration (Alaska)
TREE ='
6" McEVOY
WELLHEAD = McEVOY
ACTUATOR = OTIS
KB. ELEV = 76.78'
BF. ELEV = 39.78'
KOP= 3000'
Max Angle = 77 @ 10765'
Datum MD = 10774'
Datum TVD = 8800' SS
t. J-17b Proposed Completion
sf
¡Y NOTES: WELL ANGLE> 70 deg @ 10700'.
I 9-5/8" DV PKR .1
I 13-3/8" CSG, 72#, ID = 12.347" I
Minimum ID= 2.372" @ 9737'
Top of 2-7/8"
Proposed top of 2 3/8" @ 9690
Proposed top of 3 1/2" @ 9740
I 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I
I 9-5/8" CSG, 47#, L-80, ID = 8.671" I
Whipstock to be set at 10034 in Kingak
Existing 2 7/8" liner to be cut and pulled @ 10058
CIBP to be set in 2 7/8" @ 10,100
PERFORA TION SUMMARY
REF LOG: MCNL/GR ON 10/25/99
ANGLE AT TOP PERF: 76 @ 11180'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DATE
2" 6 11180-11210 0 1 0/08/00
2" 6 11275-11305 0 10107100
2" 6 11204-11224 0 05/15/00
2" 4 11275-11325 0 11/07/99
2" 4 11321-11365 0 10/26/99
I 7" LNR, 26#, L-80, BTRS, ID = 6.276" I
110401
8
ST MD TVD
13 3149 3067
12 5074 4610
11 6476 5603
10 7171 6094
9 7322 6204
8 7806 6564
7 7962 6689
6 8276 6947
5 8434 7077
4 8751 7332
3 8907 7453
2 9353 7805
1 9509 7931
I I
-1 5-1/2" CAMCO SSSVN, ID =: 4.562" I
GAS LIFT MANDRELS
DEV TYÆ VLV LATCH PORT DATE
12 OTIS LBO RA
43 OTIS LBD RA
45 OTIS LBD RA
44 OTIS LBD RA
43 OTIS LBD RA
40 OTIS LBD RA
35 OTIS LBD RA
34 OTIS LBO RA
34 OTIS LBD RA
38 OTIS LBO RA
38 OTIS LBD RA
38 OTIS LBD RA
38 OTIS LBO RA
BOT SBR WI 3.813" X PROFILE I
9-5/8" BOT 3H PKR, ID = 3.958" I
7" BOT LNR HGR TIEBACK SLEEVE I
4-1/2" OTIS X NIP, ID = 3.813" I
4-1/2" WLEG I
ELMO TT
3 1/2" cemented liner wI shoe in Sag R.
2-7/8" LNR, 6.18#, L-80, .0058 bpf, ID = 2.441" -1 114141 I
DATE REV BY COMMENTS DATE REV BY COMMENTS
07/18/83 INITIAL COMPLETION
1 0/26/99 JLH CTD SIDETRACK
11/16/00 SIS-LG CONVERTED TO CANVAS
01/26/01 SIS-LG REVISION
10103/01 RNlTP CORRECTIONS
PRUDHOE BAY UNIT
WELL: J-17A
PERMIT No: 199-092
API No: 50-029-20969-01
801' SNL & 1806' WEL, Sec. 9, T11 N, R13E,
BP Exploration (Alas ka)
0
8000
8050
8100
8150
8200
8250
8300
8350
8400
---8450
...,
()
Q)
!::::..ß500
C!
ì::ß550
8600
8650
8700
8750
8800
8850
8900
8950
9000
Section
500
1,000
Top 2 7/8" liner 9733
9 5/8" shoe 9963
Angle @ K.O.= 40
deg MD: 1 0040
Top current whipstock
11ì?c;n'
Path Distance
1,500
2,000
2,500
3,000
3,500
KOP IN LOWER KINGAK REQUIRES
THAT 3 112" BE SET AND CEMENTED
THROUGH THE KINGAK. THE REST
OF THE HOLE TO BE DRILLED WITH
TINY TOOLS
TSGR
j-17b
case 102
Oct. 1,2001
Ted x4694
Tot Drld:1586 ft
11626 TO
rei MS
Marker
TSGR
TSHU
TVD
TSAD
TVD
TCGL
MD KO Pt
MD New Hole
10,040
1586
Total MD
TVD TO
11,626
8,930
1,586
0
NEW HOLE
Kick Off
-500
j-17b
Case 102
Oct. 1,2001
-1 ,000
Ted x4694
u
0
....J
U
ìIi
E
0
.....
-
- 1 ,500
BCGl
()
u
¡;:
rn
...,
fJ
'ü
>-
-2,000
1,586
KOP IN LOWER KINGAK REQUIRES
THAT 3 1/2" BE SET AND CEMENTED
THROUGH THE KINGAK. THE REST
OF THE HOLE TO BE DRILLED WITH
TINY TOOLS
-2,500
5,500
5,000
4,500
3,500 4,000
X distance from Sfc LOG
#########
7:24
Case 122
3,000
Drawn:
Plan Name:
(
(
211 CT
10,000 psi
Pack-Off
Lubricator
J-17b
CT Drilling & Completion BOP
,¡(
1211
3611
en
w
J: Blind/Shear
0
Z 22.511 7 1/1611
it) Pipe '" 2 3/811. 3 1/2" VBR
to
C\I
,..
18" t
3811 Pipe/Slip ... 2 3/811
7 1/1611
Pipe/Slip ~ 211
SWAB OR MASTER VALVE
J-17b cement
(
Subject: J-17b cement
Date: Wed, 21 Nov 2001 10:05:24 -0600
From: "Stagg, Ted 0 (ORB IS)" <StaggTO@BP.com>
To: "Tom Maunder (E-mail)..<tom_maunder@admin.state.ak.us>
Tom,
You are working late! While there is a lot bad about the long and late
hours you are working there is also a bit of good news there in that it
suggests that you are probably happy with your work. I sure hope that is
the case. And I hope you get some help soon.
I looked at my cement calculations and find that I ran my numbers assuming a
3.75" open hole instead of a 3" open hole that the 2 3/8" will be in. What
a difference. I now get 7 bbls for open hole annulus wI 40% excess plus 1.2
bbls above the window plus 0.5 bbls in the tailpipe and 0.2 b shoe track
making the total about 9bbls. This is why we always have several people
calculate cement volumes. It is too easy to make an error.
J-17b will target the same Zone 2a sands that were completed in J-17a. We
are shifting the offtake point from N/E of the original J-17 BHL to SIW of
the original BHL. I hope it works out. These are really small drops of oil
that we are targeting.
Ted
1 of 1
(
11/21/01 7:52 AM
198743
(
('
DATE
09/28/01
CHECK NO.
00198743
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
ALASKAOILA
NET
00
92701 CK092701G
PYMT OMMENTS:
HANDL NG I NST:
100.00
100.00 H
Per it to Drill ee
S/H - Terri Hubb e X4628
-s.\¡ß
TOTAL ~
rrACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
100.00
100. 0
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFlUATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H 198743
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
412
00198743
AY
ONE HUNDRED & 00/10Q***...***************...***************** US DOLLAR
0 The
RDER
Of
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 ..WEST 7TH AVEN...,E
SUITE 100
ANCHORAGE
DATE
09/28/01 JI
NOT VALID AFTER 1.20 DAYS
AMOUNT
$100.001
AK 99501
Ç¿~øf¿.~ I
III ~ 9 a ? L. ~ III I: 0 L. ~ 2 0 :I a 9 5 I: 0 0 a L. L. ~ 9 III
- ----....--.....--p
"'"
(
(
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME ~ \ - \ '\ ~
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
DEVELOPMENT /
REDRILL V
PILOT HOLE (PH)
EXPLORA TION
ANNUL~SAL
ANNULAR DISPOSAL
INJECTION WELL
L-) YES
INJECTION WELL
REDRILL
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new well bore segment of existing well
--"---' Permit No, . API No. .
Production should continue to be reported as a function of
the original API number stated above. .
In accordance with 20 AAC 25.005(f), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated.. .
ANNULUS
L-> YES +
SP ACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved ,sùbject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving .a spacing exception.
(ComDanv Name) will assume the liability of any protest to
the spacing exception that may occur.
WELL PERMIT CHECKLIST
FIELD & POOL
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . .
2. Lease number appropriate. . . . . . . . . . . . . . . . . . .
3. Unique well name and number. .. . . . . . . . . . . . . . . .
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . N
5. Well located proper distance from drilling unit boundary. . . . N
6. Well located proper distance from other wells. . . . . . . . . . N
7. Sufficient acreage available. in drilling unit.. . . . . . . . . . . N.
8. If deviated, is wellbóre plat included.. . . . . . . . . . . . . . N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . . . . N
11. Permit can be issued without conservation order. , . . . . . . N
AP R DATE 12. Permit can.be issued without administrative approval.. . . . . N
It, z.{. D ( 13. Can permit be approved before 15-day wait.. . . . . . . . . . . N
~~: ~~~~~~:~;~=~II kn~~ ÙSDWs:: .. .. .. .. : .. . . . ~ ~( '.\ J ~ L f., 't ~ Ñ' '\
16. CMT vol adequate to circulate on conductor & surf csg. . . . . Y N) ~ . c:s. ~ ~ \~~ ~~
17. CMT vol adequate to .tie-in long string to surf csg. . . . . . . . Y N
18. CMT will cover all known productive horizons. . . . ... . . . . ! N
~~. ~~sing ~e:ig~s adequate for C~tT, B & permafrost. . . . . . . . ~ «.1.', k \. ,'\ ~ «:. ~~~(t-. ~.-.\-
21: If ae:~ri~I,~:Sa~~~~~~:~~~~d~n~~~t b~e~ ~~p~o~~d: : : . N s~ \:--~~'-\ ~~\~ :~ \\ . .
22. Adequate wellbore separation proposed.. . . . . . . . . . . . N ~ C \0 c...c c ~\>~nl' b \~ ~ f'\\' -\\~cJ
23. If diverter required, does it meet regulations. . . . . . . . . . ~ ~ ~
24. Drilling .fluid program schematic & equip list adequate. . ~ . . N . .
25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N ~
(~~;.S 26. BOPE press rating appropriate; test to ?> ~ 0 psig. . N \-'\~~. :\7 ~ ~~ ""'-Ck~ cl ~ d';J \J,,-\ ~~ . . .
. 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N . .
28. Work will occur without operation shutdown. . . . . . . . . . . Y ~ M . ~ "''\ , ~ , , ~. Å (
29. Ispre,senceof.H2SgasprObable................. ~'J'-Jè> .~,",,~~'\c:Jt'~<: ~cJCC,",ðS~~~...~'\':>~\J\r~~d~1~~,,~o~~~'Q~S
30. Permit can be Issuedw/o.hydrogen sulfide measures. . .... .Y(Ñ~ rJ-~.-¿tc."¡ ¿~e../k dQ{-t aU2L{ç{.?~/~<J ,4.) i{x:~~( /h S, /A(t..
31. Data presented on potential overpressure zones. . . . . . . ~ . U (/ (j .
32. Seismic anal~~is of shallow gas zones. . . . . . . . . . . .. ,..¡A Y N .
AP R DATE 33. Seabed condition survey (If off-shore). . . . . . . . . . . . ~ Y N
If -Z/. b I 34. Contact name/phone for weekly progress reports [explorpl6ry only] Y N
ANNULAR DISPOSAL35. With proper cementing records. this plan.
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface;.. .
(C) will not impair mechanical integrity ~f the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING:. UIC/Aonular COMMISSION:
~ WM~
ENGINEERING
GEOLOGY
APPR DATE
COMPANY
INIT CLASS
Y N
Y N
c
0
Z
0 (
-I
~
::0
-I
m
Z
-I
J:
en
:Þ
::0 (
m
>
/~e~~~f~~)
/
~
Comments/Instructions:
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)
t
(
Well H ¡story File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Pennitting Process
but is part of the history file. .
To improve the readability of the Well History file and to
simplify finding information. information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically.,..,
organize this category of information.
(
(
**** REEL HEADER ****
MWD
02/06/06
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
02/05/30
239382
01
1.75" NaviGamma - Gamma Ray
*** LIS COMMENT RECORD ***
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!
Remark File Version 1.000
Extract File: Idwg.las
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
-Version Information
VERSo
WRAP.
-Well Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 10013.0000:
STOP.FT 11616.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API. API NYUMBER:
-Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 09
TOWN.N 11N
RANG. 13E
PDAT. MSL
EPD . F 0
LMF . RKB
FAPD.F 77
DMF KB
EKB .F 77
EDF .F N/A
EGL .F N/A
CASE.F N/A
OSl . DIRECTIONAL
-Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAM) presented is realtime data.
(4) Tie in log with Schlumberger BHCS/GR.
(5) The RA marker was at 10031' MD.
(6) The hole section from 10012' MD to 10400' MD was logged by
Sperry Sun.
(7) The hole section from 10400' MD to 10512' MD was relogged
by the BHI NG tool.
(8) Well J-17BPB1 is a sidetrack of the original well, which wa~
1. 20:
NO:
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
Level Spa.cing
Absent Value
BP AMOCO
J-17BPB1
Prudhoe Bay Unit
801' SNL, 1806' WEL
North Slope
Alaska
Baker Hughes INTEQ
1 .75" NaviGamma - Gamma Ray
12-Jan-02
500292096970
Description
-------------------------------
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
, oq 33
a Dj~ddtj
(
(
kicked off through a window at 10021' MD (8331' SSTVD).
(9) Well J-17BPB1 was drilled to 11616' MD (8919 SSTVD).
(10) The interval from 11598' MD (8919' SSTVD) to 11616' MD (8919' SSTVD)
was not logged due to sensor to bit offset.
(11) The data presented here is final and has been depth
shifted to a PDC (Primary Depth Control) supplied by BPX (SWS, 18-Jan-02).
(12) A Magnetic Declination correction of 26.38 degrees has been applied
to the Directional Surveys.
MNEMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units)
GRAM -> Gamma Ray MWD-API [RWD] (MWD-API units)
ROPS -> Rate of Penetration, feet/hour
TVD -> Subsea True
CURVE SHIFT DATA
BASELINE, MEASURED,
10028.3, 10029.5,
10032.6, 10034.4,
10045.7, 10054.0,
10057.4, 10063.5,
10060.3, 10065.3,
10063.7,10069.2,
10073.8, 10077.1,
10086.8, 10090.5,
10089.3,10092.5,
10092.1, 10095.8,
10103.3, 10106.2,
10112.2, 10114.2,
10117.0, 10120.9,
10127.1, 10128.9,
10132.0, 10135.9,
10133.8, 10137.5,
10136.1, 10138.9,
10138.7, 10140.9,
10143.2, 10145.0,
10147.4, 10148.7,
10152.1, 10153.3,
10154.6, 10155.8,
10159.0, 10159.8,
10170.4, 10169.8,
10185.4, 10186.4,
10193.3, 10193.7,
10209.6, 10211.8,
10213.5, 10215.9,
10233.3, 10235.6,
10243.1, 10245.1,
10254.7, 10259.4,
10292.5,10296.3,
10309.9, 10313.0,
10319.7, 10323.7,
10331.7, 10335.5,
10357.1, 10360.8,
10363.2, 10367.1,
10368.1, 10372.4,
10396.1, 10398.5,
10481.6, 10490.2,
10514.8,10523.5,
10525.4,10533.6,
10536.0, 10544.4,
10573.8, 10583.2,
10587.9,10596.6,
10649.0,10657.5,
10750.3,10749.9,
10761.1, 10762.7,
10794.2, 10796.7,
10822.6, 10823.2,
10828.3, 10830.1,
EOZ
END
Vertical Depth, feet
DISPLACEMENT
1.18066
1.77148
8.26465
6.09961
4.91895
5.50879
3.3457
3.73828
3.14844
3.73926
2.95215
1. 96777
3.93555
1.77148
3.93555
3.73926
2.75488
2.16406
1.77148
1. 37793
1.18066
1.18066
0.787109
-0.589844
0.983398
0.393555
2.16504
2.36133
2.36133
1.96777
4.72266
3.73828
3.14844
3.93555
3.73828
3.73926
3.93555
4.3291
2.36133
8.65723
8.6582
8.26465
8.46094
9.44531
8.6582
8.46094
-0.393555
1. 57422
2.55762
0.589844
1.77051
['
(
(
! BASE CURVE: GROH, OFFSET CURVE: GRAM
Tape Subfile: 1
121 records...
Minimum record length:
Maximum record length:
8 bytes
13 2 bytes
**** FILE HEADER ****
MWD
.001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------
WDFN mwd.xtf
LCC 150
CN BP AMOCO.
WN J-17BPB1
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!! !!!! !!! !! ! ! !! ! !!! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR GR GRAM10 0.0
ROP ROP ROPS10 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
(
(
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 API 4 4
2 ROP MWD 68 1 F/HR 4 4
-------
8
Total Data Records:
39
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
10013 .000000
11616.000000
0.500000
**** FILE TRAILER ****
Tape Subfile: 2
48 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD
.002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------
WDFN mwd.xtf
LCC 150
CN BP AMOCO.
WN J-17BPB1
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAM
GRAM
GRAM
0.0
ROPS
ROPS
ROPS
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
(
(
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
Size Length
1
2
GRAM MWD
RaPS MWD
68
68
1
1
API
F/HR
4
4
4
4
-------
8
Total Data Records:
39
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
10012.000000
11616.000000
0.500000
**** FILE TRAILER ****
Tape Subfile: 3
48 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
02/0513 0
239382
01
**** REEL TRAILER ****
MWD
02/06/06
BHI
01
Tape Subfile: 4
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH
10013.0000
10013 .5000
10100.0000
10200.0000
GR
-105.8868
77.0984
87.0739
178.8364
Rap
-999.2500
-999.2500
-999.2500
-999.2500
10300.0000
10400.0000
10500.0000
10600.0000
10700.0000
10800.0000
10900.0000
11000.0000
11100.0000
11200.0000
11300.0000
11400.0000
11500.0000
11600.0000
11616.0000
(
28.0512
24.2730
17.9152
24.9689
21.2276
22.3709
26.5438
31.4580
23.2258
21.3425
21.1709
17.5469
22.3117
-999.2500
-999.2500
(
-999.2500
-999.2500
-999.2500
36.3794
51.7957
48.3166
65.8489
43.5254
118.3041
142.4278
151.6914
109.1396
70.6080
175.1809
117.1701
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH
10012.0000
10012.5000
10100.0000
10200.0000
10300.0000
10400.0000
10500.0000
10600.0000
10700.0000
10800.0000
10900.0000
11000.0000
11100.0000
11200.0000
11300.0000
11400.0000
11500.0000
11600.0000
11616.0000
GRAM
75.2600
77.4900
89.5900
182.1900
28.4600
21.0100
16.9410
20.4660
21. 6530
19.4350
24.9620
29.0310
29.7460
20.8200
20.1130
16.6900
25.1420
-999.2500
-999.2500
10013 .000000
11616.000000
0.500000
ROPS
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
-999.2500
43.8990
36.2350
62.5390
73.1770
46.6460
83.8990
140.5380
13.5000
110.7820
56.5910
144.6450
153.9200
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS
10012.000000
11616.000000
0.500000
(
**** REEL HEADER ****
MWD
02/06/06
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
02/05/30
239382
01
1.75" NaviGamma - Gamma Ray
*** LIS COMMENT RECORD ***
(
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
Remark File Version 1.000
Extract File: ldwg.las
! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! !
-Version Information
VERSo
WRAP.
-Well Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 10013.0000:
STOP.FT 11731.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API. API NYUMBER:
-Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 09
TOWN.N 11N
RANG. l3E
PDAT. MSL
EPD . F 0
LMF . RKB
FAPD.F 77
DMF KB
EKB .F 77
EDF .F N/A
EGL .F N/A
CASE.F N/A
OSl . DIRECTIONAL
1. 20:
NO:
-Remarks
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP AMOCO
J-17B
Prudhoe Bay Unit
801' SNL, 1806' WEL
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Gamma Ray
18-Jan-02
500292096902
Description
-------------------------------
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(1)
(2 )
(3 )
(4)
( 5)
( 6)
(7)
All depths are Measured Depths (MD) unless otherwise noted.
All depths are Bit Depths unless otherwise noted.
All Gamma Ray data (GRAM) presented is realtime data.
Tie in log with Schlumberger BHCS/GR.
The RA marker was at 10031' MD.
The hole section from 10012' MD to 10400' MD was logged by
Sperry Sun.
The hole section from 10400' MD to 10512' MD was reloggeè
aOJ-d~tj
I093t!
(
(
by the BHI NG tool.
(8) Well J-17B is a sidetrack of the original well, which was
kicked off at 10700' MD (8849' SSTVD).
(9) Well J-17B was drilled to 11731' MD (8922 SSTVD).
(10) The interval from 11712' MD (8922' SSTVD) to 11731' MD (8922' SSTVD)
was not logged due to sensor to bit offset.
(11) The data presented here is final and has been depth
shifted to a PDC (Primary Depth Control) supplied by BPX (SWS, 18-Jan-02).
(12) A Magnetic Declination correction of 26.38 degrees has been applied
to the Directional Surveys.
:MNEMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units)
GRAM -> Gamma Ray MWD-API [RWD] (MWD-API units)
RaPS -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth, feet
CURVE SHIFT DATA
BASELINE, MEASURED, DISPLACEMENT
10032.8, 10034.2, 1. 37695
10073.0, 10076.3, 3.34473
10089.5, 10092.4, 2.95215
10091.7, 10095.4, 3.73828
10103.1, 10106.4, 3.34473
10112.3, 10114.5, 2.16406
10120.0, 10123.2, 3.14844
10125.1, 10127.1, 1.96777
10147.3, 10148.9, 1.57324
10151.8, 10153.6, 1.77051
10155.0, 10160.1, 5.11621
10170.9, 10170.1, -0.787109
10187.8, 10186.6, -1.18066
10194.9, 10195.9, 0.984375
10210.0, 10212.2, 2.16504
10216.5, 10218.9, 2.36133
10232.1, 10234.1, 1.96777
10247.7, 10250.2, 2.55859
10254.7, 10259.5, 4.72266
10282.7, 10285.1, 2.36133
10300.0, 10304.1, 4.13281
10309.5, 10313.4, 3.93555
10319.9, 10323.6, 3.73926
10339.6, 10344.7, 5.11621
10357.3, 10361.1, 3.73828
10363.4, 10367.0, 3.54199
10368.2, 10372.5, 4.3291
10396.1, 10398.0, 1. 96777
10403.4, 10405.5, 2.16406
10424.5, 10426.3, 1.77148
10467.6, 10471.9, 4.3291
10505.3, 10514.1, 8.85449
10524.5, 10533.2, 8.65723
10535.8, 10544.9, 9.05078
10570.9, 10580.2, 9.24805
10573.3, 10583.3, 10.0352
10581. 0, 10591.6, 10.626
10592.8, 10601.1, 8.26367
10618.7, 10627.4, 8.65723
10649.9, 10657.5, 7.67383
10673.9, 10683.1, 9.24805
10695.1, 10704.2, 9.05176
10721.1, 10723.4, 2.36133
10760.6, 10762.8, 2.16406
10786.8, 10791.8, 4.91895
10795.3, 10796.7, 1. 37793
10820.5, 10823.6, 3.14844
10846.4, 10848.6, 2.16406
10882.9, 10882.9, 0
10917.0, 10915.8, -1.18066
('
10939.6,
10958.9,
10985.8,
11049.7,
11089.7,
11125.4,
11141. 9,
11162.0,
11187.8,
11212.9,
11228.3,
11260.1,
11283.7,
11301.6,
11313.0,
11335.8,
11360.9,
11385.4,
11405.6,
11432.1,
11445.6,
11452.9,
11463.8,
11477.4,
11501.5,
11519.6,
11535.6,
11560.7,
11575.2,
11584.9,
11603.2,
11624.0,
(
1.18066
1. 37793
2.16406
0.393555
2.36133
1.96777
2.36133
1. 37695
-0.787109
-1.77051
-0.393555
1. 37793
1. 37695
2.16504
1.77051
1.57422
2.95117
4.72168
2.55859
0
3.54199
-0.393555
3.14844
2.95117
2.95215
-0.197266
-0.393555
-0.393555
-0.787109
-0.59082
0.787109
0
10938.5,
10957.5,
10983.6,
11049.3,
11087.3,
11123.5,
11139.6,
11160.6,
11188.6,
11214.7,
11228.7,
11258.7,
11282.3,
11299.5,
11311.3,
11334.2,
11358.0,
11380.7,
11403.0,
11432.1,
11442.1,
11453.3,
11460.7,
11474.4,
11498.6,
11519.8,
11536.0,
11561. 0,
11576.0,
11585.5,
11602.4,
11624.0,
EOZ
END
! BASE CURVE: GROH, OFFSET CURVE: GRAM
Tape Subfile: 1
Minimum record length:
Maximum record length:
MWD
.001
**** FILE HEADER ****
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------
WDFN mwd.xtf
LCC 150
CN BP AMOCO.
WN J-17B
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
152 records...
8 bytes
13 2 bytes
*** LIS COMMENT RECORD ***
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
Remark File Version 1.00C
(
(
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR GR GRAM10 0.0
ROP ROP ROPS10 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
Size Length
1
2
GR
ROP
MWD
MWD
68
68
1
1
Þ.PI
F/HR
4
4
4
4
-------
8
Total Data Records:
41
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
10013 .000000
11731.000000
0.500000
**** FILE TRAILER ****
Tape Subfile: 2
50 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD
.002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------
WDFN
mwd.xtf
(I'
'"
\
LCC 150
CN BP AMOCO.
WN J-17B
FN Prudhoe Bay Unit
COUN North Slope
STAT Alaska
*** LIS COMMENT RECORD ***
!! !!!!! !!!!! !!!! ! !! Remark File Version 1.000
The data presented here is the unedited field raw data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAM GRAM GRAM 0.0
ROPS ROPS ROPS 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
Size Length
1
2
GRAM MWD
ROPS MWD
68
68
1
1
API
F/HR
4
4
4
4
-------
8
Total Data Records:
41
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
10012.000000
11731.000000
0.500000
**** FILE TRAILER ****
Tape Subfile: 3
50 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
02/05/30
('
(
"
239382
01
**** REEL TRAILER ****
MWD
02/06/06
BHI
01
Tape Subfile: 4
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH GR ROP
10013.0000 -923.9685 -999.2500
10013.5000 75.4230 -999.2500
10100.0000 87.0717 -999.2500
10200.0000 167.2192 -999.2500
10300.0000 27.8997 -999.2500
10400.0000 22.3277 -999.2500
10500.0000 21.2453 -999.2500
10600.0000 29.2202 36.2805
10700.0000 18.5729 89.6605
10800.0000 18.2394 98.5295
10900.0000 21. 6301 70.3818
11000.0000 18.7058 129.2880
11100.0000 21.1556 118.9142
11200.0000 23.5913 85.6758
11300.0000 34.7910 138.5020
11400.0000 35.2396 59.0529
11500.0000 43.6169 117.1299
11600.0000 28.0708 101.4151
11700.0000 18.4330 135.0630
11731.0000 -999.2500 47.4930
Tape File Start Depth 10013.000000
Tape File End Depth 11731.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
DEPTH GRAM ROPS
10012.0000 75.2600 -999.2500
10012.5000 77.4900 -999.2500
10100.0000 89.5900 -999.2500
10200.0000 182.1900 -999.2500
10300.0000 28.4600 -999.2500
10400.0000 21. 0100 -999.2500
10500.0000 16.4860 -999.2500
10600.0000 20.4570 43.8990
10700.0000 22.5040 65.4120
10800.0000 18.5240 109.3580
10900.0000 20.7470 88.2950
11000.0000 18.0780 133.0440
11100.0000 18.2460 120.1240
11200.0000 25.7900 87.8050
11300.0000 30.9730 142.2420
11400.0000 27.4440 82.3770
11500.0000
11600.0000
11700.0000
11731.0000
(
38.3320
27.6440
18.5960
-999.2500
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
Tape Subfile 4 is type: LIS
~
122.3870
106.2270
135.0630
47.4930
10012.000000
11731.000000
0.500000
(
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Fri Sep 20 09:13:20 2002
Reel Header
Service name. ... ... ..... .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02/09/20
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.... ........... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
C omme n t s . . . . . . . . . . . . . . . . . S T S LIS
,{
\
Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/09/20
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name........... .... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
Writing Library. Scientific Technical Services
MWD RUN 1
AK-MW-22003
B. JAHN
SEVCIK/SARBE
MWD RUN 4
AK-MW-22003
B. JAHN
SEVCIK/SARBE
MWD RUN 8
AK-MW-22003
C. ZAWADZKI
SEVCIK/SARBE
MSL 0)
J-17B (Upper Section
500292096902
BP Exploration (Alaska), Inc.
Sperry Sun
20-SEP-02
MWD RUN 2
AK-MW-22003
B. JAHN
SEVCIK/SARBE
MWD RUN 5
AK-MW-22003
B. JAHN
SEVCIK/SARBE
MWD RUN 9
AK-MW-22003
C. ZAWADZKI
SEVCIK/SARBE
9
llN
13E
801
1806
76.78
.00
39.78
MWD RUN 3
AK-MW-22003
B. JAHN
SEVCIK/SARBE
MWD RUN 6
AK-MW-22003
B. JAHN
SEVCIK/SARBE
MWD RUN 10
AK-MW-22003
C. ZAWADZKI
WHITLOW/GOOD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 9963.0
aOI-d~LJ
110 to
(
¡'"
~,
2ND STRING
3RD STRING
PRODUCTION STRING
3.750
7.000
3.500
10021. 0
10068.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. MWD RUNS 1 - 10 ARE DIRECTIONAL WITH NATURAL GAMMA
PROBE (NGP)
UTILIZING A SCINTILLATION DETECTOR.
3. MWD RUN 9 IS SROP DATA ONLY DUE TO SHORT INTERVAL
DRILLED.
4. GAMMA RAY (SGRD) LOGGED BEHIND CASING FROM 10012'
MO, 8324' SSTVD TO
10021' MO, 8331' SSTVD.
5. GAMMA RAY (SGRD) LOGGED BEHIND CASING FROM 10038'
MO, 8343' SSTVD TO
10068' MO, 8366' SSTVD.
6. THE MWD SERVICES IN THE UPPER SECTION OF THIS WELL
ARE PERFORMED BY
SPERRY-SUN DRILLING SERVICES.
THE LOWER SECTION
OF THIS WELL ARE PERFORMED BY BAKER HUGHES INTEQ.
THE MWD SERVICES IN
7. DIGITAL DATA ONLY IS DEPTH CORRECTED TO THE PDC
GAMMA RAY LOG OF
02/20/02 (MNCL) WITH KBE = 77.0' A.M.S.L..
THIS WELL KICKS OFF FROM J-17A AT 10021' MO, 8331'
SSTVD (TOP OF WHIPSTOCK
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
8. MWD RUNS 1 - 10 REPRESENTS THE UPPER SECTION OF WELL
J-17B WITH
API # 50-029-20969-02. THE UPPER SECTION OF THIS
WELL REACHED A
TOTAL DEPTH OF 10534' MO, 8760' SSTVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
10011.0
10043.0
STOP DEPTH
10510.0
10537.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE
10011.0
10024.0
10032.0
10052.5
DEPTH
GR
10011.5
10024.5
10030.5
10049.0
10054.0
10055.0
10062.0
10063.5
10067.0
10070.5
10078.0
10090.5
10092.0
10095.5
10109.5
10114.0
10121. 0
10123.0
10127.0
10129.0
10130.5
10137.5
10141. 0
10145.0
10148.5
10152.0
10153.5
10156.0
10162.5
10170.0
10174.5
10179.5
10181. 0
10184.0
10188.0
10194.0
10196.0
10204.0
10207.0
10216.0
10219.0
10234.0
10250.5
10259.0
10268.5
10284.0
10296.5
10313.5
10323.5
10335.0
10340.0
10346.0
10361. 5
10367.0
10372.5
10378.0
10391.0
10398.5
10405.5
10412.0
10427.0
10432.0
10436.0
10440.5
10472.0
10482.5
10509.0
10537.5
$
#
MERGED DATA
PBU TOOL
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
SOURCE
CODE
(
10051. 0
10052.0
10056.0
10058.0
10062.0
10065.0
10073.5
10087.0
10089.5
10092.0
10108.0
10112.5
10117.0
10120.0
10125.0
10127.0
10129.0
10134.5
10138.5
10143.5
10147.5
10150.5
10152.0
10155.0
10161. 5
10171.0
10174.5
10179.0
10180.0
10183.5
10186.5
10193.0
10195.5
10202.5
10205.0
10214.0
10216.5
10232.5
10248.0
10255.0
10266.5
10281.0
10292.5
10309.5
10320.0
10331.5
10335.5
10341. 5
10357.5
10363.0
10368.0
10373.5
10386.5
10396.5
10403.5
10409.5
10423.0
10428.5
10433.0
10436.5
10467.5
10478.0
10505.5
10534.0
BIT RUN NO
1
2
3
4
5
6
8
9
MERGE TOP
10011. 5
10068.5
10200.5
10229.5
10398.5
10411. 5
10419.5
10450.5
(
MERGE BASE
10068.0
10200.0
10229.0
10398.0
10411. 0
10419.0
10450.0
10453.0
(
,(
MWD
$
10
10453.5
10534.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type...... .......... ..0
Data Specification Block Type... ..0
Logging Direction. ... ... ........ ..Down
Optical log depth units. ........ ..Feet
Data Reference Point.... ....... ...Undefined
Frame Spacing.................... .60 .1IN
Max frames per record.. .......... .Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10011 10537.5 10274.3 1054 10011 10537.5
ROP MWD FT/H 0.11 1112.26 40.0574 990 10043 10537.5
GR MWD API 18.02 956.65 90.3905 999 10011 10510
First Reading For Entire File......... .10011
Last Reading For Entire File.......... .10537.5
File Trailer
Service name.......... ...STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record. .65535
File Type.. ........... ...LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record..65535
File Type.............. ..LO
Previous File Name..... ..STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
10011. 5
10040.5
STOP DEPTH
10037.5
10068.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE
04-JAN-02
VERSION:
Insite 4.05.5
(
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL S~NDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units......... ..Feet
Data Reference Point....... ...... .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record........... ..Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
3.3
Memory
10068.0
41.0
41.9
TOOL NUMBER
009
3.750
10068.0
Flo Pro
11.00
65.0
10.0
146000
4.6
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
Name Service unit
DEPT FT
ROP MWD010 FT/H
GR MWD010 API
Min
10011. 5
4.37
68.06
Max
10068
1112.26
585.86
First Reading For Entire File......... .10011.5
Last Reading For Entire File.. ..... ... .10068
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Mean Nsam
10039.8 114
56.6754 56
119.756 53
(
.0
137.0
.0
.0
First
Reading
10011. 5
10040.5
10011.5
Last
Reading
10068
10068
10037.5
(
version Number........ ...1.0.0
Date of Generation... ... .02/09/20
Maximum Physical Record. .65535
File Type......... ...... .LO
Next File Name.... ...... .STSLIB.003
Physical EOF
File Header
Service name. ......... ...STSLIB.003
Service Sub Level Name...
Version Number...... .... .1.0.0
Date of Generation. ..... .02/09/20
Maximum Physical Record. .65535
File Type.......... ..... .LO
Previous File Name. ..... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
1(
header data for each bit run in separate files.
2
.5000
START DEPTH
10038.0
10068.5
STOP DEPTH
10173.0
10200.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
06-JAN-02
Insite 4.05.5
3.3
Memory
10200.0
31. 3
42.3
TOOL NUMBER
015
3.750
Flo Pro
8.50
65.0
9.0
14400
12.8
.000
.000
.000
.000
.0
141.7
.0
.0
I'
(
(
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type... ..0
Logging Direction............... ..Down
Optical log depth units........ ...Feet
Data Reference Point.. ........... .Undefined
Frame Spacing.... ............... ..60 .1IN
Max frames per record.......... ...Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type. ..0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
Name Service Unit
DEPT FT
ROP MWD020 FT/H
GR MWD020 API
Min
10038
0.5
61.66
Max
10200
129.71
956.65
Mean Nsam
10119 325
27.6323 264
164.812 271
First
Reading
10038
10068.5
10038
Last
Reading
10200
10200
10173
First Reading For Entire File......... .10038
Last Reading For Entire File......... ..10200
File Trailer
Service name........... ..STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record. .65535
File Type........ ....... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
10173.5
10200.5
STOP DEPTH
10202.0
10229.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
06-JAN-02
Insite 4.05.5
3.3
Memory
.;.
(
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type......... .........0
Data Specification Block Type.....O
Logging Direction. ............... . Down
Optical log depth units......... ..Feet
Data Reference Point............ ..Undefined
Frame Spacing............ ........ .60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
(
10229.0
28.6
30.4
TOOL NUMBER
016
3.750
Flo Pro
8.52
65.0
9.0
14400
12.8
.000
.000
.000
.000
.0
141.7
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10173.5 10229 10201. 3 112 10173.5 10229
ROP MWD030 FT/H 0.93 119.34 47.0341 58 10200.5 10229
GR MWD030 API 84.47 704.09 240.24 58 10173.5 10202
First Reading For Entire File......... .10173.5
Last Reading For Entire File.......... .10229
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/20
('
Maximum Physical Record. .65535
File Type........... .... .LO
Next File Name......... ..STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation..... ..02/09/20
Maximum Physical Record. .65535
File Type........... .... .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
5
t
header data for each bit run in separate files.
4
.5000
START DEPTH
10202.5
10229.5
STOP DEPTH
10371. 0
10398.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
07-JAN-02
Insite 4.05.5
3.3
Memory
10398.0
26.6
27.6
TOOL NUMBER
016
3.750
FloPro
8.60
65.0
8.5
20000
12.0
.000
.000
.000
.000
.0
150.0
.0
.0
(
(
$
#
Data Format Specification Record
Data Record Type. ...... .... .......0
Data Specification Block Type... ..0
Logging Direction... .... ...... ....Down
Optical log depth units...... .... .Feet
Data Reference Point.. ....... .....Undefined
Frame Spacing........ .......... ...60 .1IN
Max frames per record... ....... ...Undefined
Absent value...................... -999
Depth units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10202.5 10398 10300.3 392 10202.5 10398
ROP MWD040 FT/H 2.37 140.84 64.8488 338 10229.5 10398
GR MWD040 API 22.39 551.61 48.2348 338 10202.5 10371
First Reading For Entire File........ ..10202.5
Last Reading For Entire File....... ... .10398
File Trailer
Service name.... ........ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.. .... .02/09/20
Maximum Physical Record..65535
File Type. ...... ........ .LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number...... .... .1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record..65535
File Type.............. ..LO
Previous File Name..... ..STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
6
header data for each bit run in separate files.
5
.5000
START DEPTH
10371. 5
10398.5
STOP DEPTH
10383.5
10411. 0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
08-JAN-02
Insite 4.05.5
3.3
Memory
10411. 0
(
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.............. ....0
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units......... ..Feet
Data Reference Point......... .... .Undefined
Frame Spacing................ .... .60 .1IN
Max frames per record............ .Undefined
Absent value.. ................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
26.6
26.6
TOOL NUMBER
016
3.750
Flo Pro
8.60
65.0
8.5
20000
12.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
('
.0
150.0
.0
.0
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10371. 5 10411 10391.3 80 10371. 5 10411
ROP MWD050 FT/H 0.11 27.34 7.47365 26 10398.5 10411
GR MWD050 API 27.11 48.35 30.8288 25 10371. 5 10383.5
First Reading For Entire File......... .10371.5
Last Reading For Entire File.......... .10411
File Trailer
Service name..... ...... ..STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record. .65535
File Type................ LO
(
Next File Name..... ..... .STSLIB.007
Physical EOF
File Header
Service name...... ... ....STSLIB.007
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation.. .... .02/09/20
Maximum Physical Record. .65535
File Type................ LO
Previous File Name... ....STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
7
(
header data for each bit run in separate files.
6
.5000
START DEPTH
10384.0
10411. 5
STOP DEPTH
10392.0
10419.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
07-JAN-02
Insite 4.05.5
3.3
Memory
10419.0
29.4
30.0
TOOL NUMBER
016
3.750
Flopro
8.61
62.0
8.3
19000
12.0
.000
.000
.000
.000
.0
150.0
.0
.0
(
(
Data Format Specification Record
Data Record Type. .... ........... ..0
Data Specification Block Type.....O
Logging Direction......... ....... . Down
Optical log depth units... ....... .Feet
Data Reference Point. ........... ..Undefined
Frame Spacing....... ......., ..... .60 .1IN
Max frames per record...... ...... .Undefined
Absent value. ..... ........ ...... ..-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10384 10419 10401. 5 71 10384 10419
ROP MWD060 FT/H 1.17 47.79 19.5 16 10411.5 10419
GR MWD060 API 24.69 32.98 28.0271 17 10384 10392
First Reading For Entire File......... .10384
Last Reading For Entire File.......... .10419
File Trailer
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/09/20
Maximum Physical Record..65535
File Type............... .LO
Next File Name.......... .STSLIB.008
Physical EOF
File Header
Service name......... ....STSLIB.008
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation... ....02/09/20
Maximum Physical Record..65535
File Type........... .... .LO
Previous File Name.. .... .STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
8
header data for each bit run in separate files.
8
.5000
START DEPTH
10392.5
10419.5
STOP DEPTH
10422.5
10450.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
08-JAN-02
Insite 4.05.5
3.3
Memory
10450.0
;(
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type........... ..... ..0
Data Specification Block Type... ..0
Logging Direction.... ...... ..... ..Down
Optical log depth units.... .... ...Feet
Data Reference Point. ...... .... ...Undefined
Frame Spacing............. ..... ...60 .1IN
Max frames per record..... ..... ...Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
29.0
29.0
TOOL NUMBER
016
3.750
FloPro
8.60
60.0
8.3
19000
8.2
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD080 FT/H 4 1 68 4 2
GR MWD080 API 4 1 68 8 3
Name Service Unit
DEPT FT
ROP MWD080 FT/H
GR MWD080 API
Min
10392.5
0.23
19.05
Max
10450
39.96
35.68
First Reading For Entire File. ..... ....10392.5
Last Reading For Entire File.. .... .....10450
File Trailer
Service name. ........... .STSLIB.008
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.009
Mean Nsam
10421.3 116
6.92113 62
23.1607 61
(~
.0
154.0
.0
.0
First
Reading
10392.5
10419.5
10392.5
Last
Reading
10450
10450
10422.5
{
Physical EOF
File Header
Service name............ .STSLIB.009
Service Sub Level Name...
Version Number.. ..... ....1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record..65535
File Type............ ... .LO
Previous File Name...... .STSLIB.008
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
ROP
$
9
(
header data for each bit run in separate files.
9
.5000
START DEPTH
10450.5
STOP DEPTH
10453.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
08-JAN-02
Insite 4.05.5
3.3
Memory
10453.0
.0
.0
TOOL NUMBER
3.750
FloPro
8.60
.0
8.3
19000
8.2
.000
.000
.000
.000
.0
150.0
.0
.0
(
(
Optical log depth units.......... .Feet
Data Reference Point. ............ .Undefined
Frame Spacing...... ........ ...... .60 .1IN
Max frames per record............ .Undefined
Absent value. .... .... ........... ..-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD090 FT/H 4 1 68 4 2
Name Service Unit
DEPT FT
ROP MWD090 FT/H
Min
10450.5
1. 06
Max
10453
39.79
Mean Nsam
10451.8 6
18.6383 6
First
Reading
10450.5
10450.5
Last
Reading
10453
10453
First Reading For Entire File......... .10450.5
Last Reading For Entire File......... ..10453
File Trailer
Service name.... .... .... .STSLIB.009
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation... ....02/09/20
Maximum Physical Record..65535
File Type. .............. .LO
Next File Name.......... .STSLIB.010
Physical EOF
File Header
Service name. ........... .STSLIB.010
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record. .65535
File Type. ..... ......... .LO
Previous File Name...... .STSLIB.009
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
10
header data for each bit run in separate files.
10
.5000
START DEPTH
10423.0
10453.5
STOP DEPTH
10506.5
10534.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
09-JAN-02
Insite 4.05.5
3.3
Memory
10534.0
35.3
42.2
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
(
NGP
$
NATURAL GAMMA PROBE
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............ ......0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point........ ..... .Undefined
Frame Spacing.. ............ ...... .60 .1IN
Max frames per record......... ... .Undefined
Absent value..................... .-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
016
3.750
Flo Pro
8.60
62.0
8.8
11400
9.6
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD100 FT/H 4 1 68 4 2
GR MWD100 API 4 1 68 8 3
Name Service Unit
DEPT FT
ROP MWD100 FT/H
GR MWD100 API
Min
10423
0.73
18.02
Max
10534
41. 81
212. 62
First Reading For Entire File........ ..10423
Last Reading For Entire File.. ........ .10534
File Trailer
Service name... ........ ..STSLIB.010
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .02/09/20
Maximum Physical Record. .65535
File Type............ ... .LO
Next File Name.......... .STSLIB.011
Physical EOF
Tape Trailer
Service name... ...... ... .LISTPE
Mean Nsam
10478.5 223
22.754 162
29.3539 168
(
.0
158.0
.0
.0
First
Reading
10423
10453.5
10423
Last
Reading
10534
10534
10506.5
Î ~I~
(
Date. . . . . . . . . . . . . . . . . . . . .02/09/20
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.. ........... ...UNKNOWN
Continuation Number..... .01
Next Tape Name......... ..UNKNOWN
Comments... ......,...... .STS LIS
Reel Trailer
Service name.. .......... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/09/20
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number.... ..01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS
Physical EOF
Physical EOF
End Of LIS File
Writing Library.
Writing Library.
(
Scientific Technical Services
Scientific Technical Services