Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-233
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _Inserts\Microfilm _ Marker.doc
(
('
Memorandum
State of Alaska
Oil and Gas Conservation Commission
To:
Well File: Prudhoe Bay Unit P-18A Permit # 201-233
Cancelled Permit Action
Prudhoe Bay Unit P-18AXX API # 029-22097-95
February 22, 2002
This memo will remain at the front of the subject well file.
Our adopted conventions for assigning API numbers, permit numbers and well names did not
specifically address expired or cancelled permits. This omission has caused some inconsistencies in
the treatment of these kinds of applications for permit to drill. Operators have asked us to adopt formal
procedures for this class of permit application in order to prevent future database disparities.
If a permit expires or is cancelled by an operator, the permit number of the subject permit will remain
unchanged. The API number and in some instances the well name reflect the number of preexisting
redrills and or multilaterals in a well. In order to prevent confusing a cancelled or expired permit with
an active well or multilateral these case sensitive well identifiers will be changed for expired and
cancelled applications for permits to drill.
The API number for this cancelled or expired permit is modified so the eleven and twelfth digits is 95.
The well name for a cancelled or expired permit is modified with an appended xx.
These procedures are an addendum to the API numbering methods described in AOGCC staff
memorandum "Multi-lateral (wellbore segment) Drilling Permit Procedures, revised December 29,
1995.
AOGCC database has been changed to reflect these changes to this permit.
CANCELED PERMITS ARE RELEASABLE 2 years from the date on the letter
received from the operator requesting the permit canceled. (Memorandum January 23,
1997 by Dave Johnston, subject: Canceled and Expired Pe rmits)
Statistical Technician
bp
(
(
.,.
.",.""
.........~ ~.~
~...- --:..~--
..~ .¡:~"
.'jj'~~'\.
".
Terrie Hubble
Direct: (907) 564-4628
hubbletl@bp.com
Technical Assistant
GPB Drilling & Wells
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
February 22, 2002
Alaska Oil & Gas Conservation Commission
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
Reference: Permit to Drill, 201-233
To Whom I t May Concern:
Please cancel the Permit to Drill for P-18A, Permit Number 201-233 (50-029-22097-01) and the
accompanying Application for Sundry Approval for P-18, Approval Number 301-332, which was to plug and
abandon the original hole. I believe you have recently received several e-mails indicating that the plans have
been changed and it has been decided to drill a lateral hole and leave the original hole intact, producing from
both legs. A revised Permit to Drill was submitted with these changes and a new well name given of P-18L1.
This would, of course, require changing the API Number.
Thank you very much for your assistance in this matter.
Sincerely,
.~~~
Terrie Hubble
RECEIVED
FEe 2 2 2002
Alaska Oil Be Gas Cons Com' .
Anchorage mIssIon
ORIGINAL
.ì
(
~i~iŒ (ffi~ ~~~~æ~
(
ALAS KA 0 IL AND GAS
CONSERVATI ON COMMISSION
TONY KNOWLES, GOVERNOR
333 W. "JTH AVENUE. SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Ted Stagg
. CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage AK 99519-6612
Re:
Prudhoe Bay Unit P-18A
BP Exploration (Alaska) Inc.
Pennit No: 201-233
Sur Loc: 2348' NSL, 2076' EWL, Sec. 31, TIIN, R13E, UM
Btmhole Loc. 2581' SNL, 951' EWL, Sec. 05, T10N, R13E, UM
Dear Mr. Stagg:
Enclosed is the approved application for pennit to redrill the above referenced well.
. The pennit to redrill does not exempt you from obtaining additional pennits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required pennitting detenninations are made.
Annular disposal has not been requested as part of the Pennit to Drill application for Prudhoe
Bay Unit P-18A.
Blowout prevention equipment (BOPE) must be tested in accordance with 20AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
(jj/rtAMA A'fJuU'~
C~;~echsli T;ylbr -
Chair
BY ORDER OF THE COMMISSION
DATED this 14th day of December, 2001
jjcÆnclosures
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
'0
,<
ALAS(
STATE OF ALASKA,
OIL AND GAS CONSERVATION cot
PERMIT TO DRILL
20 AAC 25.005
,ISSION
IjJG!\-- I'LI/u{ul
diU H- ,'þ/ '4/6/
1;- \?-ll ~
1a. Type of work 0 Drill II Redrill 1 b. Type of well 0 Exploratory ~tratigraPhiC Test II Development Oil
0 Re-Entry 0 Deepen 0 Service 0 Development Gas . Singl~ ¡one 0 Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 1 Ö. Field and Pool
BP Exploration (Alaska) Inc. KBE = 91.851 Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 6 2B26~~, AD ~,.Q28289
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25,025)
2348' NSL, 20761 EWL, SEC. 31, T11N, R13E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
12981 SNL, 4761 EWL, SEC. 05, T10N, R13E, UM P-18A Number 2S1 00302630-277
At total depth 9. Approximate spud date
25811 SNL, 951' EWL, SEC. 05, T10N, R13E, UM 01/20/02 Amount $200,000.00
12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028288,2581' MD No Close Approach 2560 127001 MD / 89551 TVDss
16. To be completed for deviated wells 0 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 109501 MD Maximum Hole Angle 99 Maximum surface 2294 psig, At total depth (TVD) 88001 / 3350 psig
18. Casing Program Specifications Setting Depth Quantitv of Cement
ize T~ 10 Bottom
Hole Casino Weiaht Grade CouDlina Lenath MD TVD MD TVD v' (include staae data \
3-3/4" 3-1/2" x 3-3/16" 8.81/6.2/6.16# L-80 ST-L 2200' 105001 84751 12700' 89551 Uncemented Solid & Slotted Liner
x 2-7/8"
-RE~"'I\ ..-. "'
IT .r- I V. . ~
,-.
~._. €'II ^ "Inn-1
19. To be completed for Redrill, Re-entry, and Deepen Operations. j"lfJUV ~ ;; LUUI
Present well condition summary Alaska OIl & Gas COnS. commisSion
Total depth: measured 11520 feet Plugs (measured)
true vertical 9296 feet Anchorage
Effective depth: measured 11398 feet Junk (measured)
true vertical 9208 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" To Surface 1101 1101
Surface 2690' 10-3/4" 2891 cu ft Permafrost 2690' 2690'
Intermediate 108281 7-5/8" 1588 cu ft Class 'G' 10828' 8785'
Production
Liner 9611 5-1/2" 191 cu ft Class 'GI 10559' - 115201 8605' - 92961
Perforation depth: measured 11062'-111001,111261-11144, 111541-111701, 111801-11191'
true vertical 8959' - 89881, 9008' - 90211, 90291 - 90411, 90481 - 9056'
20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the forego~ g)J true and correct to the best of my knowledge
Signed Ted Stagg ""- ' 'oOf"17 f ,", Title CT Drilling Engineer Dat~ ' I
'!;,i""""I,',',' '-"""'i~ ,::!"I:I";' ~'::I;!:""""" e""'I"'I""'~Q'mml~'li:il:P!:::'.:!I:' "",!:,:~
II', ,,""':",1', ",_""
,I '", ",I "" "I"
Permit Number API Number A~ p~v~~~tô \ See cover letter
'"2L.) J --- ¿3-=5 50- 029-22097-01 for other reQuirements
Conditions of Approval: Samples Required DYes ~NO Mud Log Required DYes IBf No
Hydrogen Sulfide Measures [2! Yes No Directional Survey Required jZ!Yes DNo
Required Working Pressure for BOPE D2K D3K D4K D5K D10K D15K .Kl3.5K psi for CTU
ClJiginal Signed By by order of (~.1~~()(
Cammy Oechslh ~ 1 ^ I " I ACbmmissioner
AoDroved Bv the commission Date
Form 10-401 Rev. 12-01-85 UK' lJ I t\lJ-\L Submit Inlriplicate
('
(
BP
P-18a Sidetrack
Summary of Operations:
A CTD through tubing sidetrack is planned for well P-18. The coil sidetrack, P-18a, will exit the 5 1/2" liner ~.
in the Shublik formation and target Zone 4B. P-18a will be completed with a combination solid/slotted 27/8"--
liner. Because of gas in the Sag River, perfs will be shot in the upper Shublik in preparation for a cement
squeeze to improve isolation. These new perfs will be produced for clean up prior to the cement squeeze.
Existing Zone 4 perfs will be isolated with an inflatable bridge plug set in the 5 %" liner". A mechanical
whipstock will be set prior to cement squeezing the Shublik perfs.
Three mapped faults will be crossed in this sidetrack. If any of these faults prove to be conductive then the/'
sidetrack will be plugged back to the conductive fault to permit the shortened sidetrack to be completed wiUi
a slotted liner. An open hole resistivity log will be run.
Phase 1: Prep work. Planned for Dec. 10-15,2001.
1. Drift tubing and liner with dummy whipstock.
2. Run casing caliper over whipstock interval.
3. Perforate Shublik from 10,930-10,940 (8767ss-8775ss), 6 SPF, in preparation for cement sqz.
Flow for several days to clean up ahead of squeeze.
Phase 2: Prep work. Planned for Jan. 1-15,2002.
4. Dummy off all GLM's and perform IA MIT to 2500 psi.
5. Use E-line to set an IBP at approx. 11 ,050'MD (8859ss).
6. Use E-line to set a mechanical whipstock at approx. 10,950'MD (8783ss).
7. Use service coil to cement squeeze Shublik perfs with minimum 15 bbls cement.
8. Window will be milled with drilling coil. .
Phase 3: Mill window, Drill and Complete sidetrack: Planned for Jan. 20, 2002.
Drilling coil will be used to mill the window then drill and complete the directional hole as per attached
plan. Maximum hole angle will be 100 degrees. The production liner will be a 3 %" x 3 3/16" x 2 7/8"
un-cemented solid/slotted liner.
Mud Program: /
,I
. Phase 1 &2: Seawater /
. Phase 3: Mill with seawater/biozan, drill with Flo-Pro (8.6 - 8.7 ppg)
Disposal: -//
. All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program: ,Ii~
The production liner will be a 3 V2" ST-L x 3 3/16" TC II x 2 7/8" ST-L un-cemented solid/slotted liner from
TD to approx. 10,500'MD (8475ss). The X-O between 33/16" x 2 7/8" will be at 11,100' MD (8896ss).
Only the top joint will be 3 %" .
Well Control:
. BOP diagram is attached. ./
. Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
. The annular preventer will be tested to 400 psi and 2500 psi.
Directional
. See attached directional plan. Max. planned hole angle is 100 deg.
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
. An MWD Gamma Ray / Resistivity log will be run over all of the open hole section.
(
(,'
Hazards
....i/
.
The highest H2S recorded to date on P-18 was 30 ppm on 8/9/01.
Crossing three faults, with moderate risk of lost circulation.
.
Reservoir Pressure /
Res. press. is estimated to be 3350 psi at 8800'ss (7.2ppg emw). Max. surface pressure with gas (0.12
psi/ft) to surface is 2294psi. /
TREE = 4" CrN
. WELLHEAD = FMC
................................... ................ ..................
A CTUA TOR = OTIS
"""""".'""w"""-"",'w.,'""""""""""","""""'"""""""",,"""',",.w."..,.,,,.
KB. ELEV = 91.85'
"" "" . ,......"" .... ......... "'" .... ..... ""...
BF. ELEV = 55.82'
W,Ww"'""".....",'..,"""'""""""""""",""""'",,,,"""'""".
KOP = 3594'
""""""""""""""""""""""""""""""""""""""""""""""
Max Angle = 52 @ 10377'
"-"""",w"""w",'w",."-"'""",-""-""""""""".",,,,,,,"""..""
Datum MD = 10973'
'-"-',~"-""""""""""-"""""""""""""",,-,,,,,""""""'" ..
Datum lVD = 8800' SS
Pr\.,posed P-18AI ~( rYNOTES
(I)
2077'
110-3/4" CSG, 45.5#, L-80, 10 = 9.953" I
ST MD lVD
6 3016 2924
5 5443 5098
4 7835 6708
3 9317 7704
2 9934 8111
1 10433 8434
2690'
10465'
1 0467'
10500'
10524'
10544'
Minimum ID = 3.725" @ 10544'
4-1/2" OTIS XN NIPPLE
10460'
14-1/2" TAILPlÆ,12.6#, L-80, .0152 bpf, 10 = 3.958" I 10563'
TOPOF 5-1/2" TrN LNR I 10559'
10563'
I 10550'
I 7-5/8" CSG, 29.7#, NT-95HS, 10 = 6.875" I
10828'
I Sqz perfs 1-110930-10940 I
ÆRFORA TION SUMMA RY
REF LOG: ATLAS BHCA 11/14/90
ANGLE AT TOP ÆRF: 40 @ 11062'
Note: Refer to Production DB for historical perf data
1-112900"
SIZE SPF INTERV AL Opn/Sqz DATE
3-3/8" 4 11062-11100 0 03/06/91
3-3/8" 4 11126-11144 0 01/06/91
3-3/8" 4 11154-11170 0 01/06/91
3-3/8" 4 11180-11191 0 01/06/91
-14-1/2" OTIS SSSV NIP, 10 = 3.813" I
GAS LIFT MANDRELS
DEV ìYÆ VLV LATCH
0 CAMCO BK
46 CAMCO BK
49 CAMCO BK
49 CAMCO BK
49 CAMCO BK
52 CAMCO BK
PORT DATE
-14-1/2" PKR SWS NIP, 10 = 3.813" I
-1 RIGHT HAND RELEASE LA TCH I
-l7-5/8" X 4-1/2" TrN HBBP PKR, 10 = 4.0" 1
I-lTOP of Proposed 3-1/2"x3-3/16"x2-7/8" Liner I
-l4-1/2" PKR SWS NIP, 10 = 3.813" I
-l4-1/2" OTIS XN NIP, 10 = 3.725" I
-l5-1/2" TrN SEAL ASSY W/O SEALS I
1-1 ELMO IT LOGGED 02/03/91 I
1 3-3/16" X 2-7/8" XO I
00000000
12-7/8" L-80 Liner, Pre-drilled
1 PBTD I
11398'
15-1/2" LNR, 17#, L-80, .0232 bpf, 10 = 4.892" I
11520'
DATE REV BY COMMENTS DATE REV BY COMMENTS
11/19/90 ORIGINAL COMPLETION
03/04/01 SIS-SL T CONVERTED TO CANVAS
03/05/01 SIS-MD FINAL
07/15/01 RN/KA K CORRECTIONS
PRUDHOE BA Y UNIT
WELL: P-18
ÆRMIT No: 90-1450
API No: 50-029-22097-00
Sec. 31, T11N,R13E
BP Exploration (Alas ka)
BP Amoco
WELLPATH DETAILS
PIa.1I3 P.1IA
500212208701
P....tW.IIp.",
Tie....D-.
P-11
10150.00
RI"
ltef. D."....
V.$eetI..
h,l.
110.00'
21 , 11 10130'1110 00:00
11.I5ft
0",,'.
+NJ.$
0..1a
+E>W
::=~
0.00
0.00
0.00
REFERENCE INFORMATION
Co-ordinate (NÆ) Reference: Well Centre: P-18, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Slot - 18 (O.OON,O.ooE)
Measured Depth Reference: 26: 18 10130/1990 00:00 91.85
Calculation Method: Minimum Curvature
see
...
AD
173..2
173.70
172.24
165.12
.1.04
01.64
132.40
167.33
167.33
167.33
ZOO.52
167.34
205.03
18..57
1 101141.74 41.63
2 1OS5O.00 41.57
3 10060.00 43.31
4 "010.00 53.52
. """'65 00.00
. "302.06 09.00
7 "'57.06 06.70
8 "707.06 06...3
. "647.51 00.00
10 ""7.51 64.00
"12107.51 ....8
12 12327.51 64.33
13 12577.51 64.2!1
1412700.00 64.2.
8350
8400
8450- .
_8500
C
.-
= 8550
0
~8600
.c
.. 8650
a.
a.
Q 8700
-
ra
.~ 8750
1::
a. 8800
>
a. 8850
2
I- 8900
8950 .
9000'
9050
110
SECTION VETA""
TVD +...... +£I.W Ole, Thee V... T"'IIo1
.77"'2 ......... ..,...4 0.00 0.00 4528.09
.....70 -3581.03 "'3.5' ....7 138.., 4533.42
....... -358.... "'4.36 20.00 33<1.00 4540.00
..23.25 -3825.17 3421.6. 23.00 33<1.00 457..00
."'.., -3784.20 3......4 23.00 "".00 "07.78
..".55 -3765.32 3698..0 23.00 0.00 ..22.14
.....32 -3848.73 3""" 23.00 .7.00 4$35.33
8672.7. -404.... 3007.... 15.00 87.00 5155.41
......,. ""..82 39&0..' 15.00 160.00 .214.22
.870.25 -413.... 30»... 15.00 160.00 .25...2
.....,4 -4354.02 3.74.., 15.00 oz.OO ........
8017.37 -4568... 3960.15 15.00 "..00 .....13
8.....,0 _"'03 3033.83 15.00 oz.OO 5867.28
8....42 -4028.7. 3000.70 15.00 ....00 .....70
-
C -4000,
æ
0 -4100
0
~-4200
-
+
:c -4300
1:: ",
0 -4400'"
Z
-
",:",,-4500
-
.c
.. -4600'
::::I
0
en -4700
bp
Azimuths to True North
Magnetic North: 26.34.
Magnetic Field
Strength: 57479nT
Dip Angle: 80.74.
Date: 10/23/2001
Model: BGGM2001
_.------
Plan: Plan #3 (P-18/Plan#3 P-18A) ;
I
Created By: Brij Pain is Date: 10/24/2001 :
..-- ___un u_~-'
I
C,;nlar.l !r¡!orm~tiùr¡.
D:f'JrA. It/a?i 2U-¡¡Ün
E.m¡¡¡i: 'brijVf'Anis(q;ir¡Wq.wm
5:i~er Hu~JÌ1e> iNTEO' (90ìì :?ê7-6<èXJ
--.
"
\
.\
.\
'-\~ P.15 (P-1~L
. r'-U----
.:~P-15L1)j
----.
T
It
~
LEGEND
-- P-15 (P-15)
P-15 (P-15L1)
P.18 (P-18)
-..- Plan#3 P.18A
Plan /13
-3500 .
.. .'
. .
. . .' .
. .
. .' . .
2700 2800 290030003100320033003400350036003700380039004000 4100 4200 4300 4400 4500 46004700480049005000510052005300
West( - )/East( +) [100ft/in]
-3600
-3700
-3800 .
-3900 .
-4800
-4900
-5000
-5100
-5200
'.
.¿W
,
"
"
'-,
"
'-
""
'"
"-
'"
'\
CfIs:r¡;:-llik.
ANNOTATIONS
TARGET OETALS
"
.~nc_n,c,,<n,.
ITQJ
/ +\
I ,
i Plan#3 P-18Ai [P-=18At3:31
IP-=1S ~lli,
TYD
..0 h..taüo.
TW
_0$ <Ð-W"",
. -..------......
. . . . . . . .
. . .
. . .
4350440044504500455046004650470047504800485049004950 5000 5050 5100 5150 5200 5250 5300 5350 5400 5450 5500 5550 5600 5650 5700 5750 5800 5850 5900 5950 6000 6050 6100 6150 6200 6250
Vertical Section at 160.000 [50ft/in] ,
~Ot24/200-1--1--1-:08-AM-..J
1771.52 10M1.7. TIP
I7I2.TO 10150.00 KOP
1710.01 10110.00 1
1123.25 11010.00 2
1140.11 11.....5 3
1137.5511312.11 '"
1101.32 11557..1 5
1172.71 117'7'" 1
1111.11 11..7.51 7
1170.25 11117.51 1
11I4.U 12107.51 1
,.17.37 12327.51 10
1143.1012577.51 11
P-I" 131 """'00 -3751.11 "".50 POOl
P-I" 132 ""'.00 -<06293 ""'.81 P-
P.I" 13.3 8055.00 -<95UI "".18 POOl
P-I8APàJgm31 000 -3õ55.73 3383.89 PoI'fgon
,
'\,
"-..
bp
f BP Amoco (
Baker Hughes INTEQ Planning Report
-"""'-"--'-----"'-""----""'-'-""""""""""""
INTEQ
C~~;~n;~"BP A~~~o"'--""-"-'- -- ...- ..--...........-.......-.. ... --- ..... Da;e~"-'-"-1 0"/23/2001 Ti~~~'1"5:47:'1-2 __'..n no "_"__p~~~~n """"--~"".-"1
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: P-18, True North I
Site: PB P Pad Vertical (TVD) Reference: System: Mean Sea level
l;";;'-h:_;~~~!..:!!!~-----_.._-_..__.._-_....____..I:'~;;..~~~~;~~~d~....";i~;;o~~~~~-~O~~O~~b:__~~CI=_J
I"'Fi;ld-~--.- ---- -~~~~if~~:y--'--'-------- _n~__.._- --- --- - - ---..- -- .-------....---- -- ----- --______n____--_-- -------- - _moo - -- - ---- ------------------ -----------1
l UNITED STATES
Map sYstem_:- US State Plane _Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea level Geomagnetic Model: BGGM2001
----------- ----------- ---------- ---------.---..-------.---.---
--- --- ----------------- -------. -------..-------------------------.----.--.------------ -- -----------------------------------
Site:
PB P Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5949377 .17 ft
623154.06 ft
Latitude: 70 16 12.612 N
Longitude: 149 0 14.402 W
North Reference: True
Grid Convergence: 0.94 deg
-..--- -.--------------------------- ----- ____n___..._--.- -..--------.---------------------- ---- ---..---- --.------.--------.-------.----- ------...-..--------------- ----.. -.. -,,------_.....----- _.- -----...---..---.---------------- ___-----n____._---.---
-----------.-----.-.------.....--------.-..---- ----- -----------.-----..-------. ---- ------..-- .-------- ----------------------------.--.--.- - -----.-- ....--..-. -----..----------.------- -.-----...---..--.-..--------...---------
Well: P-18
P-18
Well Position: +N/-S -2434.07 ft Northing:
+E/-W 8169.82 ft Easting:
Position Uncertainty: 0.00 ft
Slot Name:
18
5947077.29 ft
631361.94 ft
Latitude:
Longitude:
70 15 48.630 N
148 56 16.650 W
.--.--------.--..-- ---...---------..-------.------------- ------..----.-----.----....----.--------.---------- ------ --.. -------..-----------...--..-----..----..--..-..---------.----___"_--m_--------.---- -- ---- -- ------..-----.---,,-----..----.---..----.------.... ------- ---- ------ ---------
..-.-..--..--....-.....----.-----...---..-,--------...--.----.-..----...------.-.- ---..---..-....------.---.----..--------..------------.-.-----..-..........-...--.-.---..----.--..--------..--------------..-----..--..---- ....------.-------.- -'---------'--""'----- --"-....-- ---_.-" ---.-.-...--..-
Wellpath: Plan#3 P-18A Drilled From: P-18
500292209701 Tie-on Depth: 10950.00 ft
Current Datum: 26 : 18 10/30/199000:00 Height 91.85 ft Above System Datum: Mean Sea level
Magnetic Data: 10/23/2001 Declination: 26.34 deg
Field Strength: 57479 nT Mag Dip Angle: 80.74 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
------..---..-----.--- """"-------.."----------.-----.-..---- ---- --.----..---..-----.-..-.. --.--..--..------- -_..----- -----....--- "'------.__"___n__.___.-"-"'--"-"- ----..------..---..------------.--..--- -.----.--- -------..--------------- -------
0.00 0.00 0.00 160.00
----.....----------------,,-.---.-...-.----..--..---------------._--------- .-----------.----------....---.--.--- ---- ------- -..------------........-..--..-----..--,,-----.....----.---------------------------------- --..--------------------..---------------.-.---- ---.---.-------.
~~j~::~~~~~=~~:= ~~J~i;t~:""'-=-J::~v;~a~-~-==--==-=~
Targets
..-"--"'- --'- .-.....,................... ....-.-..... ..-....... "-""-' "".."'-""""""'-"--""""'.' -.-..--...----..-......-. "-""-"."-.' ..............-......- ........ ---.. -..-.--.......--.-.....- ..-.-.--.,.........-....-.. - "-"-"'" ......- -.........................,.-....... ....---........-....-............-........ - ...---.."... -- -...._, ....."... '--.' ----...-......-..---......-..... .,_.. ....-......,..---.. _.......
- -
P-18A Polygon3.1
-Polygon 1
-Polygon 2
-Polygon 3
-Polygon 4
-Polygon 5
-Polygon 6
-Polygon 7
8867.00 -4062.93 4046.81
8955.00 -4952.81 3896.18
0.00 -3655.73 3383.89
0.00 -3655.73 3383.89
0.00 -4171.79 3905.12
0.00 -4976.02 3843.82
0.00 -5097.06 3976.00
0.00 -3984.04 4120.03
0.00 -3533.59 3703.83
0.00 -3521.62 3378.94
Map Map <-- Latitude---> --- <-- Longitude -->
Northing Easting Deg MiD Sec Deg Min See
ft ft
------------.-------
5943391.07 635096.02 70 15 11.729 N 148 54 29.916 W
5943085.90 635478.68 70 15 8.660 N 148 54 18.946 W
5942193.60 635343.62 70 14 59.909 N 148 54 23.340 W
5943481.45 634808.82 70 15 12.668 N 148 54 38.222 W
5943481.45 634808.82 70 15 12.668 N 148 54 38.222 W
5942974.60 635338.93 70 15 7.590 N 148 54 23.069 W
5942169.49 635291.68 70 14 59.681 N 148 54 24.864 W
5942050.78 635425.94 70 14 58.490 N 148 54 21.021 W
5943166.06 635550.52 70 15 9.436 N 148 54 16.815 W
5943609.14 635126.55 70 15 13.868 N 148 54 28.914 W
5943615.44 634801.53 70 15 13.987 N 148 54 38.364 W
-- Name Description TVD +N/-S +E/-W
i - "ft ,,-ft ft-
- - --
-- -_._._- --- -----.----.---- ----.-.----- --_.-
P-18A T3.1 8940.00 -3751.11 3669.50
P-18A T3.2
P-18A T3.3
.---..----------- --_._----..--------. ---------.---.- -------..--".-.---.----- -----.--.--.-..----..---------..-..-.----------.-------.-----..-------------------..--.-----..----..---.-........-....--.---- .--.-------------..----------..--- -----...--.---- ,,----------.-------..-.-.-----.--..----.---
Annotation
!"-'---.-MD---- TVD . ------------- -'-.--" ------.-----.-...----
--- "".---"'-._"__"_~"_"'_---:"":._---_....__c,,_..~.__...,,_.....-- ---..........--.......----.....--..... - .....-.-.-....-..--_c_-.-----...---..-...--.--..-..---...-.-......-.... ..--..--."-...--.--.----...-...--....-----.-..-........-...---..-...--.-.-....-..----.-..----..------------------"":"-----..--..---
10941.74 8776.52 TIP
10950.00 8782.70 KOP
10960.00 8790.08 1
11010.00 8823.25 2
11343.85 8940.61 3
11382.98 8937.55 4
11557.98 8909.32 5
11787.98 8872.79 6
"-"-'
-------------.._-._-------------
-------,--- --------"-'----'.-----.'------'--"--"'-'---______n____-----.---------- -..- -- -- --..---- ------"--.---------.'-."--"----"---"'-------"-----------. ..-..-- -----..------.---.------..-------.-....------ --------------------..--"._,------.._--_.._.._-----------------,,---..-.-.-----------.----- ---.------.--..-.-.---.---.. -
. 'bp
. " ~
( BP Amoco (
Baker Hughes INTEQ Planning Report
llií8
BAKl.1I
HUGHES
""""""""""""""""""""""""""""""'"
INTEQ
....................-..... ...........................""""""""""
Company: BP Amoco
Field: Prudhoe Bay
Site: PB P Pad
Well: P-18
Wellpath: Plan#3 P-18A
Annotation
MD TVD
ft ft
11847.51 8868.16 7
11887.51 8870.25 8
12107.51 8894.14 9
12327.51 8917.37 10
12577.51 8943.10 11
12700.00 8955.42 TD
Date: 10/23/2001 Time: 15:47:12 Page: 2
Co-ordinate(NE) Reference: Well: P-18, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: Well (0.00N,0.00E,160.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
. ......... "'.."'-" """""""""""""""""""~'-""""""""""""""""
.............._m___...- ..---...-..--........--......-..-.._...___h"..._....--..-..--..............-. ""'-"""'--"""""""""--"-"""'-""'--"""""""".......... .. ...- .......-...---......................................................--
Plan Section Information
------..-.-- -""-'- """"---- .....--... ,..... ...--..,. -...."...-,......- ......--.. ..... .......... .............-.....-.. ..............."....,....... .........".,..... """-"---' ....-...-.., .,......-........,...-... ""'---""" ...-.. -.-- -..- ...........-.. ,.,.... .""'", --..............-....-. -"'-'-"""'-""""" "'-
MD Incl Azim TVD +E/-W DLS Build Turn TFO
ft dêg deg ft ft degl100ftdeg/100ft dèg/l0aft deg
....-............................."............".. ................,...........'........,...........................................-.............".."........"....,..... ...............................,.............."...........,........,.................-..........."..............".......,.......................-""""""""""""""""""""""""""""""""""""""""'".".............."..."....,......................,............,....,................"...,.......................
10941.74 41.63 173.62 8776.52 -3576.48 3412.94 0.00 0.00 0.00 0.00
10950.00 41.57 173.70 8782.70 -3581.93 3413.55 0.97 -0.73 0.97 138.51
10960.00 43.31 172.24 8790.08 -3588.63 3414.38 20.00 17.41 -14.58 330.00
11010.00 53.52 165.12 8823.25 -3625.17 3421.88 23.00 20.41 -14.24 330.00
11343.85 90.00 91.64 8940.61 -3784.20 3659.94 23.00 10.93 -22.01 280.00
11382.98 99.00 91.64 8937.55 -3785.32 3698.90 23.00 23.00 0.00 0.00
11557.98 98.79 132.40 8909.32 -3848.73 3855.64 23.00 -0.12 23.29 87.00
11787.98 98.93 167.33 8872.79 -4042.08 3967.90 15.00 0.06 15.19 87.00
11847.51 90.00 167.33 8868.16 -4099.92 3980.91 15.00 -15.00 0.00 180.00
11887.51 84.00 167.33 8870.25 -4138.88 3989.66 15.00 -15.00 0.00 180.00
12107.51 83.88 200.52 8894.14 -4354.02 3974.91 15.00 -0.05 15.09 92.00
12327.51 84.33 167.34 8917.37 -4569.24 3960.15 15.00 0.20 -15.08 269.00
12577.51 84.29 205.03 8943.10 -4812.03 3933.83 15.00 -0.02 15.08 92.00
12700.00 84.26 186.57 8955.42 -4928.79 3900.79 15.00 -0.02 -15.08 269.00
............-.. ..,-.-.....".--.-...............".." .-.....,....-.....- -.--..... ....-.............. ................ . "'-""'-"-"-'-""'-'-'--------""'-""""""""""""""""'-....--...."........ .......'....,. ................ """'-"""""""'-""'-'.""'" ......... . .-.O'..-...-.....-...........-..O'.........."......O'........................
Survey
r' ........ _............. ..........-... ...., .......... ........,.. .......... ....................................... ....." -................... ...........,-......- -..........-.......... --.. .................-....... .......-...... ........ c....,.... --"""'-""--"--""-""""'" """""""C" ....-.........- ,.........-.-.. ..-.-............ ................-......--......c-...--..-..-........- ---...--..-......
MD loci Azim . SSTVD N/S E/W ' MapN MapE DLS VS TFO Tool
L._.......,......~~... ........_........~:.~...........~.~~.. ft ft ft ft ft deg/l00tt ft deg
""""..... ........-..... .............. ..., """""""""""""'" '.... ..... .... ...... ,""""...." ......". ". ........ --.... 'm_,,"."""""'" ""'.O'" O'.. ""'.."......."'""""", ............. ............. "'.. """""""""""""'" -"........"......-... ."""....'....-..'....... .."..... ..
10941.74 41.63 173.62 8776.52 -3576.48 3412.94 5943561.18 634836.48 0.00 4528.09 0.00 TIP
10950.00 41.57 173.70 8782.70 -3581.93 3413.55 5943555.74 634837.18 0.97 4533.42 138.51 KOP
10960.00 43.31 172.24 8790.08 -3588.63 3414.38 5943549.06 634838.13 19.99 4540.00 329.94 1
10975.00 46.32 169.86 8800.72 -3599.07 3416.03 5943538.65 634839.96 23.00 4550.37 330.04 MWD
11000.00 51.44 166.37 8817.16 -3617.49 3419.92 5943520.31 634844.17 23.00 4569.01 331.69 MWD
11010.00 53.52 165.12 8823.25 -3625.17 3421.88 5943512.66 634846.26 23.03 4576.90 334.01 2
11025.00 54.19 160.93 8832.10 -3636.75 3425.41 5943501.14 634850.00 22.99 4588.99 279.94 MWD
11050.00 55.62 154.12 8846.48 -3655.63 3433.24 5943482.40 634858.15 23.00 4609.41 282.47 MWD
11075.00 57.42 147.57 8860.28 -3673.82 3443.40 5943464.40 634868.62 23.00 4629.97 286.39 MWD
11087.66 58.46 144.36 8867.00 -3682.71 3449.40 5943455.62 634874.78 23.00 4640.38 290.01 P-18A
11100.00 59.55 141.30 8873.36 -3691.14 3455.79 5943447.30 634881.32 23.00 4650.48 291.71 MWD
11125.00 61.96 135.32 8885.58 -3707.40 3470.30 5943431.29 634896.10 23.00 4670.73 293.29 MWD
11150.00 64.61 129.61 8896.83 -3722.46 3486.77 5943416.53 634912.83 23.00 4690.51 296.21 MWD
11175.00 67.48 124.15 8906.98 -3736.15 3505.04 5943403.15 634931.34 23.00 4709.63 298.78 MWD
11200.00 70.52 118.93 8915.94 -3748.35 3524.93 5943391.31 634951.43 23.00 4727.89 301.00 MWD
11225.00 73.71 113.90 8923.62 -3758.92 3546.23 5943381.12 634972.92 23.00 4745.11 302.87 MWD
11250.00 77.02 109.03 8929.94 -3767.76 3568.73 5943372.67 634995.57 23.00 4761.11 304.42 MWD
11275.00 80.41 104.30 8934.84 -3774.78 3592.21 5943366.06 635019.16 23.00 4775.74 305.65 MWD
11300.00 83.86 99.65 8938.26 -3779.91 3616.43 5943361.35 635043.46 23.00 4788.84 306.58 MWD
11325.00 87.35 95.07 8940.18 -3783.10 3641.14 5943358.59 635068.22 23.00 4800.29 307.21 MWD
11343.85 90.00 91.64 8940.61 -3784.20 3659.94 5943357.82 635087.04 22.99 4807.76 307.58 3
11350.00 91.41 91.64 8940.54 -3784.38 3666.09 5943357.75 635093.20 23.00 4810.03 359.93 MWD
11375.00 97.16 91.64 8938.67 -3785.09 3691.00 5943357.47 635118.11 23.00 4819.22 0.00 MWD
11382.98 99.00 91.64 8937.55 -3785.32 3698.90 5943357.38 635126.01 23.00 4822.14 0.05 4
11400.00 99.18 95.60 8934.86 -3786.38 3715.67 5943356.62 635142.79 22.99 4828.86 87.00 MWD
11425.00 99.37 101.42 8930.82 -3790.03 3740.06 5943353.39 635167.24 23.00 4840.64 87.63 MWD
11450.00 99.47 107.25 8926.73 -3796.13 3763.94 5943347.71 635191.23 23.00 4854.54 88.57 MWD
11475.00 99.47 113.08 8922.61 -3804.63 3787.08 5943339.62 635214.51 23.00 4870.44 89.52 MWD
11500.00 99.37 118.91 8918.51 -3815.43 3809.24 5943329.20 635236.85 23.00 4888.17 90.48 MWD
( BP Amoco ( rC.8
bp BAKa.
HUGHES
Baker Hughes INTEQ Planning Report """""""""""""""""""""""""""""""-
INTEQ
I"'~i~~~~;;"""'~'~'~~~~i~;' ......... Date: 10/23/2001 Time: 15:47:12 Page: 3
Co-ordinate(NE) Reference: Well: P-18, True North
! Site: PB P Pad Vertical (TVD) Reference: System: Mean Sea Level
l..;.;:.;~.~~~.:.........~~;.;~..~.~.~..~~..................... Section (VS) Reference: Well (0.00N,O.00E,160.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
"""""""""""""""""""""" ........... . .... ...... ... ...... ......... .......... ................... ..... -.-.. -........ """"'...-............'-"""""""""'"",-"--",,, ..-.--.... -......... ...-.--..... ..-...--...........oo.............................................. ................. ................. ....... --... ...... ........ "'"
Survey
MD Incl Azim SSTVD N/S E/W MapN MapE DLS VS TFO Tool
ft deg deg ft ft ft ft ft deg/100ft ft deg
..........."......................................... """""""""""""""""""" " '" -oo.. ........ ......-......... ........-.....-....-......- """-'--'--""'" ............... ....... ................... """'.....-_._.....oo-........... ..---..--....-.........-.......- ........---......-............... ..-................-. .....oo... ...... ...,... "'...-.. -.. ....... ..... .....
11525.00 99.18 124.73 8914.48 -3828.43 3830.19 5943316.57 635258.03 23.00 4907.55 91.44 MWD
11550.00 98.90 130.54 8910.55 -3843.50 3849.73 5943301.84 635277.83 23.00 4928.40 92.38 MWD
11557.98 98.79 132.40 8909.32 -3848.73 3855.64 5943296.72 635283.82 23.01 4935.33 93.26 5
11575.00 98.91 134.98 8906.70 -3860.34 3867.80 5943285.32 635296.18 14.99 4950.40 87.02 MWD
11600.00 99.06 138.77 8902.79 -3878.36 3884.68 5943267.60 635313.37 15.00 4973.10 87.40 MWD
11625.00 99.18 142.57 8898.83 -3897.45 3900.32 5943248.79 635329.34 15.00 4996.39 87.99 MWD
11650.00 99.25 146.37 8894.82 -3917.53 3914.66 5943228.97 635344.03 15.00 5020.16 88.59 MWD
11675.00 99.28 150.17 8890.80 -3938.51 3927.63 5943208.22 635357.36 15.00 5044.32 89.20 MWD
11700.00 99.27 153.97 8886.77 -3960.30 3939.19 5943186.63 635369.30 15.00 5068.75 89.81 MWD
11725.00 99.23 157.77 8882.75 -3982.82 3949.27 5943164.30 635379.77 15.00 5093.36 90.43 MWD
11750.00 99.14 161.56 8878.76 -4005.96 3957.85 5943141.31 635388.75 15.00 5118.03 91.04 MWD
11775.00 99.01 165.36 8874.81 -4029.62 3964.87 5943117.78 635396.19 15.00 5142.67 91.64 MWD
11787.98 98.93 167.33 8872.79 -4042.08 3967.90 5943105.37 635399.43 15.01 5155.41 92.22 6
11800.00 97.13 167.33 8871.11 -4053.69 3970.51 5943093.82 635402.24 15.00 5167.21 180.04 MWD
11825.00 93.38 167.33 8868.82 -4077.97 3975.97 5943069.63 635408.13 15.00 5191.90 180.00 MWD
11847.51 90.00 167.33 8868.16 -4099.92 3980.91 5943047.77 635413.45 15.00 5214.22 179.98 7
11850.00 89.63 167.33 8868.17 -4102.35 3981.45 5943045.35 635414.03 15.00 5216.69 180.18 MWD
11875.00 85.88 167.33 8869.15 -4126.72 3986.93 5943021.09 635419.93 15.00 5241.46 180.00 MWD
11887.51 84.00 167.33 8870.25 -4138.88 3989.66 5943008.98 635422.87 15.00 5253.82 179.96 8
11900.00 83.94 169.21 8871.56 -4151.04 3992.19 5942996.87 635425.61 14.99 5266.11 92.00 MWD
11925.00 83.83 172.98 8874.23 -4175.59 3996.04 5942972.39 635429.89 15.00 5290.50 91.80 MWD
11950.00 83.75 176.75 8876.93 -4200.34 3998.26 5942947.68 635432.54 15.00 5314.51 91.40 MWD
11975.00 83.70 180.53 8879.66 -4225.18 3998.85 5942922.86 635433.57 15.00 5338.06 90.99 MWD
12000.00 83.68 184.30 8882.41 -4250.00 3997.80 5942898.02 635432.95 15.00 5361.02 90.58 MWD
12025.00 83.68 188.07 8885.16 -4274.70 3995.13 5942873.28 635430.71 15.00 5383.32 90.17 MWD
12050.00 83.71 191.84 8887.91 -4299.17 3990.83 5942848.75 635426.84 15.00 5404.84 89.75 MWD
12075.00 83.77 195.62 8890.64 -4323.31 3984.93 5942824.51 635421.37 15.00 5425.51 89.34 MWD
12100.00 83.85 199.39 8893.33 -4347.00 3977.46 5942800.69 635414.31 15.00 5445.22 88.92 MWD
12107.51 83.88 200.52 8894.14 -4354.02 3974.91 5942793.63 635411.88 15.01 5450.94 88.64 9
12125.00 83.84 197.88 8896.01 -4370.44 3969.20 5942777 .11 635406.45 15.00 5464.42 269.05 MWD
12150.00 83.81 194.11 8898.69 -4394.33 3962.35 5942753.11 635400.02 15.00 5484.52 269.28 MWD
12175.00 83.80 190.34 8901.39 -4418.62 3957.09 5942728.73 635395.19 15.00 5505.55 269.69 MWD
12200.00 83.82 186.57 8904.09 -4443.20 3953.43 5942704.10 635391.96 15.00 5527.39 270.10 MWD
12225.00 83.87 182.79 8906.77 -4467.97 3951.41 5942679.30 635390.37 15.00 5549.98 270.50 MWD
12250.00 83.94 179.02 8909.43 -4492.82 3951.01 5942654.45 635390.41 15.00 5573.19 270.91 MWD
12275.00 84.04 175.25 8912.04 -4517.64 3952.25 5942629.65 635392.08 15.00 5596.95 271.31 MWD
12300.00 84.16 171.49 8914.62 -4542.34 3955.12 5942605.01 635395.38 15.00 5621.14 271.70 MWD
12325.00 84.31 167.72 8917.13 -4566.80 3959.61 5942580.63 635400.30 15.00 5645.66 272.09 MWD
12327.51 84.33 167.34 8917.37 -4569.24 3960.15 5942578.20 635400.88 15.08 5648.13 272.70 10
12350.00 84.22 170.73 8919.62 -4591.21 3964.41 5942556.31 635405.52 15.01 5670.23 92.03 MWD
12375.00 84.12 174.50 8922.16 -4615.87 3967.60 5942531.72 635409.14 15.00 5694.50 91.66 MWD
12400.00 84.05 178.27 8924.73 -4640.68 3969.17 5942506.94 635411.14 15.00 5718.35 91.28 MWD
12425.00 84.01 182.04 8927.33 -4665.54 3969.11 5942482.08 635411.51 15.00 5741.69 90.89 MWD
12450.00 83.99 185.81 8929.95 -4690.34 3967.40 5942457.26 635410.24 15.00 5764.41 90.50 MWD
12475.00 83.99 189.58 8932.57 -4714.97 3964.08 5942432.57 635407.35 15.00 5786.42 90.10 MWD
12500.00 84.03 193.35 8935.18 -4739.34 3959.14 5942408.13 635402.83 15.00 5807.62 89.71 MWD
12525.00 84.08 197.12 8937.77 -4763.32 3952.60 5942384.03 635396.72 15.00 5827.93 89.32 MWD
12550.00 84.17 200.89 8940.33 -4786.83 3944.51 5942360.39 635389.03 15.00 5847.25 88.93 MWD
12575.00 84.27 204.66 8942.85 -4809.76 3934.88 5942337.29 635379.81 15.00 5865.51 88.54 MWD
12577.51 84.29 205.03 8943.10 -4812.03 3933.83 5942335.01 635378.80 14.82 5867.28 87.67 11
12600.00 84.24 201.64 8945.35 -4832.57 3924.97 5942314.32 635370.30 14.98 5883.55 268.95 MWD
12625.00 84.21 197.88 8947.86 -4855.98 3916.56 5942290.77 635362.30 15.00 5902.67 269.34 MWD
"""""--"""'-"-""""""""""""""""-"""""""""""'."""'-""'"" " ............-................... ........ ...................-..-........ -.....-...........--.......................--.....................-.........................-.............-........... ... ......-.-..........-. -...........-...... """"""""""""""'.'-"""----'-'-"'--"-"'-'" .-..
bp
( BP Amoco (
Baker Hughes INTEQ Planning Report
llii8
BAK"
HUGHiS
"""""""""""""""""""""""""""""._-,
INTEQ
r~i:~~~~;;""'-~~'~~i~~~~'."""""""
I Site: PB P Pad
I Well: P-18
l..~~!.!~~~~ ~...._~~ ~.~.~...~ =.! ~ ~....... _.........- .....-. .-....... ........... .......---...--...
..-.."'" ........ ....m ."","""'m"."_"""""""....._m..___..".........................-.........."""""'-"'-""""--"""-"""""""""""""""""""""""-"-""'...."-.........-.............-............ ....... """"""""""""""'---"""""""""""'-"""""""""'1
Date: 10/23/2001 Time: 15:47:12 Page: 4 II
Co-ordinate(NE) Reference: Well: P-18, True North
Vertical (TVD) Reference: System: Mean Sea Level I
Section (VS) Reference: Well (0.00N,0.00E,160.00Azi) I
. ..m ...... ....... -.. ...... ....................--.... ..~.~ ~.~~._~~~.~~! ~.~.~~.~ -~~~~-~~.:......._........ ~.~.~!.~~_r:n._~~~~~ ~~~.._..._.... . - ....... ....~.~~.__._?.~.~~....._...... ....J
Survey
"~~:~~~..=~..'n~~~:~"~~~~f~~:~~:f..:~:_~.~~~~=-jÑ=:~:~:~~~_J~~;-=~s::"...~:~~..~..~~ï."]
I 12650.00 84.20 194.11 8950.39 -4879.88 3909.71 5942266.75 635355.87 15.00 5922.79 269.72 MWD J
lm.... ~ ~~?~~g..~~-~::t~.. .._......2..;~:~!.._... ....._~~-~~:;~.............:~~~ti~_..- ~~~2?__..._1~:~~1L~t........;..~.~~..;-~:~ß_..........J;~~-~.--....J~:~~~?.m ._J!~~;~ __r~D ,,'m..
Well #
All Measurements are from top of Riser
Date
11/11/2001
24.7' from top of floor to rig mats
21.8' of room under floor to rig mats
'-
Q)
en
.-
0:::
top of bag
bttm of bag
middle of slips
Blind/Shears
middle of pipes
2-3/8" (lli>e/sli~
middle of flow cross
Mud Cross
middle of blind/shears
3-1/2" ejpe/sliQ!
middle of pipe/slips
2-3/8 X 3.5 Var. æ
middle of master
Lock down screws
Tubing Spool
.................. ""'"
......................
.......,....,........,.
.."..,..."..--...
7" otis X-O
BAG
TOTs
Mud Cross
TOTs
Rig mats
FlanQe to
FlanQe
Hei hts
.70'
2.80'
1.90'
1.70.
1.90.
(
('
DATE
09/28/01
CHECK NO.
00198746
H
198746
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
ALASKAOILA
NET
00
092701 CKO92701J
PYMT OMMENTS:
HANDL NG INST:
100.00
100.00
Per it to Drill ee
5/H - Terri Hubb e X4628
?~ \ 8)t
IIl~D
9 ¿DO/
'~n
'HE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ..
10 - 0
100.00
BP EXPLORATION, (ALASKA) INC.
P.o. ,BOX 196612
ANCHORAGE, ALASKA 99519.6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFIUATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H 198746
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
412
00198746
PAY
, ,
ONE HUNDRED & 00/100*************************~*********** US DOLLAR
,',DATE
09/28/011'1
NOTVALID AFTER 120 DAYS'.
\l,' 4#~/iítll};;
. " ""',._~--~~
. AMOUNT
, $10c?;QI?
To The
ORDER
Of
,ALASKA OIL AND GAS
c:q~SERVØTI(J~.COMr1ISSION
"33:3WES'T 7TH 'p.VENUE '"
SUITE lqO ,,',',,' "
ANCHORAGE
III ~ '1 a ? l. b III I: 0 l. ~ 2 0 :.I a t¡ 5 I: 0 0 a l. l. ~., III
{
('
TRANSMIT AL LETTER CHECK LIST
CIR CLE APPRO PRIA TE LETTERIP ARA GRAPHS TO
BEINCLUDEDINTRANSNDTTALLETTER
WELL NAME fl3 ¿t -ß / ç; If
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
DEVELOPMENT
RED RILL
PILOT HOLE (PH)
,j
EXPLORATION
/
ANNULAR Disp... dSAL
( \/ )l~O
-
INJECTION WELL
ANNULAR DISPOSAL
L..J YES
INJECTION WELL
RED RILL
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new well bore segment of existing well
. Permit No, . API No. . .
Production should continue to be reported as a function of
the original API number stated above. '
In accordance with 20 AAC 25.005(1), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. '. .
ANNULUS
<-> YES +
SPACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill tbe
above referenced well. The permit is approved .sùbject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company ~ame) will assume the liability of any protest to
the spacing exception tbat may occur.
WELL NAME - PROGRAM: exp - dev - redrll
El/ / D J L- GEOL AREA
,
1.Permitfeeattached....................... Y N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . N
3. Unique well name and number. .. . . . . . . . . . . . . . . . ì N
4. W ell located in a defined pool.. . . . . . . . . . . . . . . . . \ N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells. . . . . . . . . . ' N
7. Sufficient acreage available' in drilling unit.. . . . . . . . . . . Y N.
8. If deviated, is wellbóre plat induded.. . . . . . . . . . . . . . N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . . . . N
11. Permit can be issued without conservation order. . . . . . . . " N
12. Permit can.be issued without administrative approval.. . . . . ' N
13. Can permit be approved before 15-day wait.. . . . . . . . . . N
14. Conductor string provided .. . . . . . . .. . . . . . . . . . Y N ¡..iIA
~~: ~~~:IC::~~~:::~:C:r:l~t~o: ~~~:~r & ~url'~g: : : :: . o/~ I#T~C~'ó .¿x Is-h;t5
17. CMT v~1 adequate to ,tie-in long s~ng t~ surf csg. . .. . . . . y ~/ÆJ- J <~. ¡',H-.-:e{
18. CMTwlllcoveraliknownproductJvehonzons. . . . . .. . . . y ~.JjYlitR.~.#¡"'t',e<;,/\",,~'(a ,j,,;¡tt<'~
19. Casing designs adequate for C. T. B & permafrost. . . . . . . ~' N
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N
21. If a re-drill, has a 1 Q-403 for abandonment been approved. . . N ~~~ ~C \ - ~ ~
22. Adequate well bore separation proposed.. . . . . . . . . . . . N
23. If diverter required, does it meet regulations. . . . . . . . . . N IliA
24. Drilling ,fluid program schematic & equip list adequate. . . . . N '
25. 80PEs. do they meet regulation. . . . . . . . . . . . . . . . N
26. BOPE press rating appropriate; test to ~ ~ (? 0 psig. N
. 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . ~, N
28. Work will occur without operation shutdbwn. . . . . . . . . . . N
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . ~ Y N 30 ÞP~
30. Permit can be issued w/o hydrogen sulfide measures. . . . ,. Y N
31. Data prese.nted on potential overpressure zones. . . . . .. ~@
32. Seismic anal~~is of shallo~ gas zones. . . . .,' . . . . . . . ",)
APPR DATE 33. Seabed condition survey (if off-shore). . . . . . . . '. .~fv Y N
1'6 j z. ,¿, I{) I 34. Contact name/phone for weekly progress reports [e~ratory only] Y N
.;-
ANNULAR DISPOSAL35. With proper cementing records, this plan .
(A) will contain waste in a suitable receiving zone; . . . . . . .
(8) will not contaminate freshwater; or cause drilling waste. ..
to surface; . '
(C) will not impair mechanical integrity pf the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: EN INEERING: 'UICI nular COMMISSION:
~ '-l/J61t-- WM
~t-rJ~ t~,
WELL PERMIT CHECKLIST COMPANY
FIELD & POOL &7 ~D INIT CLASS
ADMINISTRA TION
serv wellbore seg _ann. disposal para req-
UNIT# O//&b5::6 ON/OFF SHORE /1
'.
...:5l<rf~cL- /:;'Gl-h~ I/t- ,4ÞLD~' r'fr ¡Jrc.ìc/ ¿#."¡~l/':<'./ ~
'7 D ?-k.- A -0 t- Ò ~ -z.,ð;9: ...5 þ ). .
APPR DATE (
~fþ !z,.{.p .0
ENGINEERING
~i.~
c
0
Z
0
-I
:E
:0
(
f'
¿,t k€..y
-
-I
m
-
/h ~ ð?L 4'. f ZLX~/.
F".j.e;{J -h:. £<- 7, 2- .PrFI E /J1 ¿J, ,ß D
Z
-I
,]:
GEOLOGY
-
APPR
DATE
Y N
Y N
$úc¡JJ .~ (j ç I
C/)
)-
:.0
m
>
(
Comments/lnstructi ons:
:vI '4/0\
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)