Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-234
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs_ Inserts\Microfilm _ Marker.doc
(
~V~VŒ (ffi~ ~~~~[ß~
(
ALAS KA 0 IL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Eduardo J unca
. CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage AK 99519
Re:
Prudhoe Bay Unit B-28A
BP Exploration (Alaska) Inc.
Permit No: 201-234
Sur Loc: 396' SNL, 1594' WEL, Sec. 31, T11N, R14E, UM
Btmhole Loc. 2214' NSL, 2985' EWL, Sec. 29, T11N, R14E, UM
Dear Mr. J unca:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting 'determinations are made.
Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe
Bay Unit B-28A.
Blowout prevention equipment (BOPE) must be tested in accordance with. 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
CÆn~ ~1J- < ~/
Camm;Pechsli Taylor
Chair
BY ORDER OF THE COMMISSION
DATED this 14th day of December, 2001
jj c/Enclosures
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environrnental Conservation w/o encl.
'\
ALAS(
STATE OF ALASKA
OIL AND GAS CONSERVATION CO("
PERMIT TO DRILL
20 AAC 25.005
..:.--,..... 'J' ~ '" A \ "ì J I I"'":' I ,<" ^
~ ¡""..H?- ¡("-t"'-"t',"-i;
~" Þ. \;1-\\ ::,
~. dMH rz¡Jlf/o/
ISSION
1 a. Type of work 0 Drill II Redrill 1 b. Type of well 0 Exploratory ~tratigraPhiC Test II Development Oil
0 Re-Entry 0 Deepen 0 Service 0 Development Gas SinglEV~one 0 Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 1 Õ. Field and Pool
BP Exploration (Alaska) Inc. KBE = 81.80' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028310
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
396' SNL, 1594' WEL, SEC. 31, T11N, R14E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
3106' NSL, 2575' EWL, SEC. 29, T11 N, R14E, UM B-28A Number 2S1 00302630-277
At total depth 9. Approximate spud date
2214' NSL, 2985' EWL, SEC. 29, T11 N, R14E, UM 01/25/02 Amount $200,000.00
12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028309, 2294' MD No Close Approach --256(Y 2 '1'1 ( 11845' MD / 8950' TVDss
16. To be completed for deviated wells 0 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 10525' MD Maximum Hole Angle 93 Maximum surface 2244 psig, At total depth (TVD) 8800' / 3300 psig
18. Casing Program Specifications Setting Depth Ouantitv of Cement
Size TOD Bottom
Hole Casino Weiaht Grade CouDlina Lenath MD TVD MD TVD (include staae data)
3-3/4" 3-3116" x 2-7/8" 6.2#/6.16# L-80 ST-L 1665' 10180' 8110' 11845' 8950' 107 cu ft Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 11400 feet Plugs (measured) 11135' Cement and Sand Cap, 11152' Baker IBP
true vertical 9200 feet
Effective depth: measured 11135 feet Junk (measured) Multiple Fish (See Diagram) at about 11168'
true vertical 8984 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110'
Surface 2641' 13-3/8" 3769 cu ft Permafrost 2641' 2615'
Intermediate 10477' 9-5/8" 2256 cu ft Class 'G' 10477' 8438'
Production
Liner 1132' 7" 383 cu ft Class 'G' 10268' - 11400' 8264' - 9200'
RECEIVED
Perforation depth: measured 11020'-11055',11072'-11112', 11165'-11190', 11198'-11202' DEC 0 4 2001
true vertical 8889' - 8918', 8932' - 8965', 9008' - 9029', 9036' - 9039'
Alaska 011 & Gas Cons. CommlssÎol
20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Pro
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Eduardo Junca, 564-5648 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is t e ar d correct to the best of my knowledge
Signed Eduardo Junca ~~- J.~- Title CT Drilling Engineer Date \"1.- -~-3 .-c'
':'",;,:"':""""""":'- ,":i~ ii,' ,'! !"I"!},:',"""':':"'."" ,i.i,l\ ,I:
""",:"',I';:"':",:",!,,!,,:,,,;::,¡-;,:,':"','I """""",:""};:',i,,,":':"':':',:,'.:'!,"',',,'":,',',':':'", I,"~ ::;,;,:,!:: "~,"~
Permit Number: I- API Number t~ro~~atQ \ See cover letter
2..t?/.- 2-~3 50- 029-21510-01 4 . ' for other reQuirements
Conditions of Approval: Samples Required DYes œ1 No Mud Log Required DYes [JNo
Hydrogen Sulfide Measures liJ Yes DNo Directional Survey Required riYes DNa
Required Working Pressure for BOPE D2K D3K D4K D5K D 10K D 15K ŒI 3.5K psi for CTU
Other: Urìginal Signed By
by order of '~.I~.() I
Approved By r-..- ^ . .. Commissioner the commission Date
,.,t I
Form 10-401 Rev. 12-01-85
ORIGINAL
Submit In Triplicate
\,
(
BPX (
B-28A CTD Sidetrack.
Summary of Operations:
A CTD horizontal sidetrack of well B-28A is proposed. Specific prep work, (Phase 1) and drilling,
(Phase 2) operations are detailed below.
Phase 1: Isolate & integrity test inner annulus (IA). Drift liner. Set whipstock. P&A.
Planned for January 7, 2002
. Integrity test IA after fluid packing & installing dummy gas lift valves.
. Drift well with dummy whipstock to pbtd.
. Set mechanical whipstock at 10,525'.
. P&A existing perforations with approx.15 bbls of 17ppg cement.
. Mill window with service coil if available.
Phase 2: Drill and Complete CTD horizontal Sidetrack: Planned January 25, 2002
2 3/8" coil will be used to drill a 33A" open hole sidetrack, approx. 1320' feet. (as per
attached plan) A solid/cemented and perforated 3-3/16" x 2-7/8" liner completion will be
run.
Max. hole angle will be 93 deg.
Mud Program:
. Phase 1: Seawater
. Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg)
Disposal:
. No annular disposal on this well. ,..-/'..
. All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program:
. 3 3/16" solid liner 6.2 #/ft run from the top of the liner at approx. 10,180'md to approx
10,585' md. Then crossed over to 2Ys" solid 6.16 #/ft liner which will be run to TO at approx
11 ,845'md. The liner will be cemented with approx. 19 bbls of 17 ppg cement.
Well Control:
. BOP diagram is attached.
. Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3,500 psi.
. The annular preventer will be tested to 400 psi and 2,200 psi.
Directional
. See attached directional plan.
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
. An MWD Gamma Ray will be run over the open hole section.
. Memory CNL will be run in the cased hole after reaching TO.
Hazards
. H2S was measured at 6 ppm on Dec 8, 1998.
. One fault crossing is prognosed,.
Reservoir Pressure
. Reservoir pressure is estimated to be 3,300 psi (7.2ppg) ,at 8,800ss. Maximum surface
pressure with gas (0.12 psi/ft) to surface is 2,244 psi. .,/'
TREE = 4" Cr-N
WELLHEA 0= FMC
AêffiJATOk;"'" """""^"6rìS
'..,......,....,......,..",.,..,...,........... """"""""...
KB. ELEV = 81,84'
""...,..",w".'w"""""",.w.ww'"""".",.",..."""",."",.',,'ww."."'"
BF, ELEV = 44,14'
.... ,.. ....", ,..,. ,...... ...."m.....
KOP = 2100'
,w.""""""",.,.w,.,."",..""".."..",.....,.
Max Angle = 48 @ 7358'
"",,""""""""" ",'..............m.. ..." "'............... m.., ,....,
Datum MD = 11011'
w."."""""ww""" """."" """""'ww'w.."""""""""""-,,,,
Datum lVD= 8800' SS
('
8-28
113-3/8" CSG, 72#, L-80, 10 = 12.347" I
2641'
Minimum ID = 3.813" @ 2096'
4-1/2" SSSV NIPPLE
14-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958" I
10234'
TOPOF 7" LNR I
10268'
19-5/8" CSG, 47#, L-80, 10 = 8.681" I
10477'
ÆRFORA TION SUMMA RY
REF LOG: SWS-BHCS ON 1/2/86
ANGLE AT TOP ÆRF: 34 @ 11020'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV A L Opn/Sqz DATE
2-7/8" 6 11020-11055 0 01/14/99
3-3/8" 6 11040-11053 0 07/25/95
3-3/8" 4 11045-11053 0 04/29/94
2-7/8" 6 11072-11112 0 01/14/99
3-1/8" 4 11165-11190 S 07/08/90
3-3/8" 4 11165-11190 0 07/14/90
3-3/8" 6 11198-11202 0 03/22/96
11357'
11400'
17" LNR, 29#, L-80, .0371 bpf, 10 = 6.184" I
8>
I I
u-eqy NOTES
2096'
-l4-1/2" OTIS SSSV LANDING NIP, 10 = 3.813" I
GAS LIFT MANDRELS
ST MD lVD DEV TYÆ SIZE
7 3252 3038 43 OTIS-LBO
6 6050 5102 45 OTIS-LBO
5 7812 6307 47 OTIS-LBO
4 8869 7070 40 OTIS-LBO
3 9427 7505 39 OTIS-LBO
2 9871 7857 36 OTIS-LBO
1 9985 7959 35 OTIS-LBO
LA TCH
RA
RA
RA
RA
RA
RA
RA
10137' -l4-1/2" OTIS XA SLOG SLY, 10 = 3.813" I
10199' -lTr-N SBR SEAL ASSY, 10 = 4.750" I
10215' -l9-5/8" x 4-1/2" Tr-N HBBP PKR, 10 = 4.75" I
10556' -l MARKER JOINT I
11135'
-1 CEMENT & SAND CAP I
1-1 BKR DISCONNECT I
-iBAKER IBP I
FISH - 83' 4-1/2", TBG & SSN RUG
w /WL FISHING STRING IN THE XN NIP
FISH - BRASS TIP FROM SSSV PULLING
PRONG, 24-1/2" x 1.95" DIA.
11148'
11152'
11168'
DATE REV BY COMMENTS DATE REV BY COMMENTS
01/07/86 ORIGINAL COMPLETION
01/31/01 SIS-SL T CONVERTED TO CANVAS
03/08/01 SIS-LG FINAL
08/16/86 RWO
05/21/01 RNlTP CORRECTIONS
PRUDHOE BA Y UNIT
WELL: B-28
ÆRMrT No: 85-3030
API No: 50-029-21510-00
Sec. 31,T11N,R14E
BP Exploration (Alaska)
TREE = 4" CrN
WELLHEAD= FMC
ÃCtUÃTOR;,^,"""""""""w"'OTÎS
"..,..",..,......,................ "","".. """""""""'......
KB. ELEV = 81.84'
W""""""""""""""'",'"w""""'w"',""""""""",,"','....".""..,..
BF. ELEV = 44.14'
.......... ,..........
KOP= 2100'
"".",.,..'.w""..'.'.'m'.","'"""""""""",,,,".".'0"".."
Max Angle = 48 @ 7358'
................................,.............., .............. ..........................,
DatumMD= 11011'
w""",'""'."',",W"""""""'......,.....,w..""......""..",w".,,..'.w
Datum "N 0= 8800' SS
('
ueqyNOlES
B-28a Proposed Completion
113-3/8" CSG, 72#, L-80, 10 = 12.347" I
2641'
Minimum ID = 3.813" @ 2096'
4-1/2" SSSV NIPPLE
Top 3 1/2" liner approx. 10,180'
14-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958"1
10234'
ITOPOF 7" LNR 1
10268'
19-5/8" CSG, 47#, L-80, 10 = 8.681"1
10477'
I Top whipstock approx. 10,525' I
ÆRFORATION SUMMARY
REF LOG: SWS-BHCS ON 1/2/86
ANGLE AT TOP ÆRF: 34 @ 11020'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV A L Opn/Sqz DATE
2-7/8" 6 11020-11055 0 01/14/99
3-3/8" 6 11040-11053 0 07/25/95
3-3/8" 4 11045-11053 0 04/29/94
2-7/8" 6 11072-11112 0 01/14/99
3-1/8" 4 11165-11190 S 07/08/90
3-3/8" 4 11165-11190 0 07/14/90
3-3/8" 6 11198-11202 0 03/22/96
I PBTD 1
17" LNR, 29#, L-80, .0371 bpf, 10 = 6.184" 1
11357'
11400'
2096'
--i4-1/2" OTIS SSSV LANDING NIP, 10 = 3.813" I
8
GAS LIFT MANDRELS
ST MD "NO DEV TYÆ SIZE LATCH
7 3252 3038 43 OTIS-LBO RA
6 6050 5102 45 OTIS-LBO RA
5 7812 6307 47 OTIS-LBO RA
4 8869 7070 40 OTIS-LBO RA
3 9427 7505 39 OTIS-LBO RA
2 9871 7857 36 OTIS-LBO RA
1 9985 7959 35 OTIS-LBO RA
I I
10137' -l4-1/2" OTIS XA SLOG SLV, 10 = 3.813" 1
C\I
-
T'""
10199' -lTrNSBRSEALASSY,ID=4.750" I
10215' -19-5/8" x 4-1/2" TrN HBBPPKR, 10 = 4.75" 1
Cement to be sqz'ed past whipstock
11135'
I 11148'
11152'
11168'
--i CEMENT & SAND CAP 1
l-l BKR DISCONNECT I
-lBAKER IBP 1
FISH - 83' 4-1/2", TBG & SSN PLUG
w /WL FISHING STRING IN THE XN NIP
FISH - BRASS TIP FROM SSSV PULLING
PRONG, 24-1/2" x 1.95" DIA.
DATE REV BY COMMENTS DATE REV BY COMMENTS
01/07/86 ORIGINAL COMPLETION
01/31/01 SIS-SL T CONVERTED TO CANVAS
03/08/01 SIS-LG FINAL
08/16/86 RWO
OS/21/01 RNlTP CORRECTIONS
PRUDHOE SAY UNIT
WELL: B-28
ÆRMrr No: 85-3030
API No: 50-029-21510-00
Sec. 31, T11N,R14E
BP Exploration (Alaska)
0
1,500
500
2,000
2,500
8450
8500
8550
8-288
Case ¡ 04
Nov, 5, 2001
8600
Ted )(4694
8650
TVO
ìVO
Off
j
8,955
@KO
700
8750
KOPt
MO New Hale
8800
8850
Total MO
TvO TO
8900
8950
é, - - -
9000
9050
Tot
320 ft
rei 145
11845 TO
10,525
1820
u
0
-'
~
(/)
E
0
....
"l-
<)
U
c:
ro
...,
If
'ë
>-
ß-28a
Case 1 04
Nov. 5, 2001
Ted x4694
Fault
3,000
3,500 4,000
X distance from Sfc Loe
4,500
5,000
4,500
4,000
3,500
3,000
2,500
2,000
5,500
NEW HOLE
Kick Off
Drawn;
Plan Name:
668,542
664,031
12
108
1,320
#########
13;16
Case 122
en
w
:I:
0
Z
Lt)
.
CD
C\I
,..
1211
3611
22.511
1811
3811
('
Lubricator
2 3/811 CT
10,000 psi
Pack-Off
/,
7 1/1611
Annular
Blind/Shear
71/1611
Pipe
,(
E-35a
CT Drilling & Completion BOP
...
2 3/811- 3 1/2" VBR
Pipe/Slip
7 1/1611
Pipe/Slip
71/16" x 5,000 psi
..
2 7/811
2 3/811
...
SWAB OR MASTER VALVE
./
./
I
./
I
./
(
(
.. """"
. ,./
...
./
DATE
09/28/01
CHECK NO.
00198747
H
198747
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
ALASKAOILA
NET
0
092701 CK092701K
PYMT OMMENTS:
HANDL NG INST:
100.00
100.00
Per it to Drill ee
S/H - Terri Hubb e X4628
RECEI ED
Þ-2E?,4
DEC 0 4 001
Alaska 011 & Gas Cons. .
Anchorage
. 'or,.
IE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
100.00
100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H 198747
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
412
00198747
PAY
ONE HUNDRED & 00/100************************************* US DOLLAR
DATE
09/28/01
I I
AMOUNT
$100.0°1
To The
ORDER
Of
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
NOT VALID AFfER 120 DAYS
AK 99501
(j ."", "
'\ ' (!; ti" 1--...
> 1 /'~ I"~ ':/
A ' .j} ò"
(, r:.-.J ,Ii" ,', ~!, ,
118 . g 8 7 L. 7 III I: 0 L. . 2 0 ~ B I:i 5 I: 0 0 B L. L. ¡. g III
CHECK 1
STANDARD LETTER
DEVELOPMENT
DEVELOPMENT
REDRILL J
EXPLORA TION
INJECTION WELL
INJECTION WELL
RED RILL
(
'\'
TRANSMIT AL LETTER CHECK LIST
CIR CLE APPRO PRIA TE LETTERIP ARA GRAPHS TO
BE INCLUDED IN TRANSNUTTALLETTER
WELL NAME PS¿i ß-- 2e /Î
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
/
ANNULAR ItISPOSAL
. ( . / ) NO
V
ANNULAR DISPOSAL
L..J YES
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new wellbore segment of existing well
. Permit No, . API No. . '
Production should continue to be reported as a function of
the original API number stated above. .
In accordance with 20 AAC 25.005(f), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for wel~ (name on permit).
Annular disposal has not been requested. . .
Annular Disposal, of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. .. .
ANNULUS
L..J YES +
SPACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved .sùbject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
WELL PERMIT CHECKLIST COMPANY
FIELD & POOL [) 50 INIT CLASS
ADMINISTRA nON 1. Permit fee attached, . . . . . . . . . . . . . . . . . . , . . .
2, Lease number appropriate. . . . . . , , . . . . . . , . . . .
3. Unique well name and number. .. . . . . . . , . . . . . . . .
4, W ell located in a defined pool.. . . . . . . , . , . . , . . . . N
5, Well located proper distance from drilling unit boundary. . . . ' N
6, Well located proper distance from other wells" , . , , . . . . N
7, Sufficient acreage available- in drilling unit., , , . . . , . . . . N.
8. If deviated, is wellbóre plat induded.. . . . , . , . , , . . . . N
9. Operator only affected party.. . . . . . . , . . . . . , , . . . N
10, Operator has appropriate bond in force. . . . . , . , , . , , , N
11. Permit can be issued without conservation order. . . . . , . , ~ N
12, Permit can.be issued without administrative approval., . . , . N
13, Can permit be approved before 15-day wait.. . . . , , . , . . N
~~: ~~~~~~:~;~i;t~~~e:1I kn~~. US'DWs:', .. '. " " " '. " .,', . ~ ~ ¡J!J:.~. o. '. 4( ~/;h ~ ~.Æ>
16. CMT vol adequate to circulate on condudor & surt csg. , . , . Y N f'J./A ' ¿)
17. CMT vol adequate to ,tie-in long string to surf csg. . . . . . . . Y N N:/A
18. CMT will cover all known produdive horizons. . . . . " . . , , N
19. Casing designs adequate for C, T, B & permafrost. . . . . . , ' N
20, Adequate tankage or reserve pit.. . . . . . . . . . . , . . . , N
21, If a re-drill, has a 10-403 for abandonment been approved. . , N
22. Adequate weilbore separation proposed.. . . , , , . . . . . . N
23. If diverter required, does it meet regulations. . . . . . . , . , N Af/A
24. Drilling ,fluid program schematic & equip list adequate. . . . , N
25. BOPEs, do they meet regulation .~ . . . . . . . . . , . . . . . IN
26. BOPE press rating appropriate; test to 3~o psig. . . N
. 27. Choke manifold complies w/API RP-53 (May 84). . . . . . ,.. ..' N
~g: ~~~:~~~rH:h;~ ~:~:~f; ~~u~d~~n: : : : : : : : : : : "'~i~ G, fe~~'~
~ & ¡j,5) l?(¿q54J ~-ß.~ ?7L I-z/?þp-
~: 6:;::':::s:~t~~s:e:"~~Ii~¡=~:::ez:~::u~~s_- .. .. .... I- ~ N f(jñ1 7
32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . . . .. ~ (\ N
:r;¡s DATE 33. Seabed condition survey (if off-shore). . . , . , . , , . . ,/"' Y N
f 2 -" D (. 34. Contad name/phone for weekly progress reports [explo¡;atóry only] Y N
ANNULAR DISPOSAL35. With proper cementing records, this plan ,
(A) will contain waste in a suitable receiving zone; . , . , . . .
(B) will not contaminate fréshwater; or cause drilling waste. ..
to surface; .
(C) will not impair mechanical integrity pf the well used for disposal; Y N
(0) will not damage producing fonnation or impair recovery from a Y N
pool; and
E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENG NEERING:. 'UIC/Annular COMMISSION:
RP~' vJ4Ar W~
SFD~ ~
jbR DATE. (
12.. .- c:,. D
ENGINEERING
m (~, Å~lo(
!:iß..
GEOLOGY
APPR
DATE
PROGRAM: exp
GEOLAREA
Y N
N
dev redrll serv wellbore seg _ann. disposal para req-
UNIT# {) / / to.5() ON/OFF SHORE 011
c
0
Z
0
-t
~
Ã]
(
-
-t
m
-.
Z
-t
,J:
-
Y N
Y N
en
»
Ã]
m
»
(
Com me ntsllnstructions:
lDl
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)