Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-145 Oilfield Services . . 2525 Gambell Street SUite 400 Anchorage, Alaska 99503 (90712731700 Fax (907) 561-8317 Schlumberger August 28, 2006 Christine Mahnken Alaska Oil & Gas 333 West 7th Avenue Suite 100 Anchorage, AK 99501 (ìf' ~) SCANNED SEP 1 9 2wdb Dear Ms. Mahnken, Enclosed please find CDs you returned to Schlumberger for being corrupted. The CD for Well S-17B appears to be blank, and a replacement is enclosed. There is nothing wrong with the other two CDs. I successfulJy opened the text files on both CDs using WordPad. The Final.tif files on both CDs were successfully processed with Schlumberger software into ASCII files, which show no sign of corruption. However, a replacement CD for each has been furnished to you. If you require further assistance reading these CDs, please contact: Sincerely, ~ Dana Kostreba Log Data Planning Coordinator DK:dk Encl: 3 original CDs: WelJs C-27B, NK-12C, and S-17B 3 replacement CDs for the above (1 Jþl-I'-lS- ~ I05~3 '_ 1C í t-{ D') Ò d03-65~ 0ó-S-1fs(P tt 138/0 ANADRILL SCHLUMBERGER Survey report 17-Aug-2001 01:56:45 Page 1 of 2 Client...................: BP Exploration (Alaska) Inc. Field....................: Prudhoe Bay Unit Well.....................: S-17B Spud date................: API number...............: 50-029-21148-02 Last survey date.........: 17-Aug-01 Engineer.................: M. Brown Total accepted surveys...: 29 MD of first survey.......: 9462.00 ft COUNTY:..................: Nabors 3S / Dowell # 4 MD of last survey........: 10445.00 ft STATE:...................: Alaska ----- Survey calculation methods------------- ----- Geomagnetic data ---------------------- Method for positions.....: Minimum curvature Magnetic model...........: BGGM version 2000 Method for DLS...........: Mason & Taylor Magnetic date............: 00-Y- 0 Magnetic field strength..: -999.25 HCNT ----- Depth reference ----------------------- Magnetic dec (+E/W-).....: -999.25 degrees Permanent datum..........: Mean Sea Level Magnetic dip.............: -999.25 degrees Depth reference..........: Gr Tiein 9260 GL above permanent.......: -50000.00 ft ----- MWD survey Reference Criteria --------- KB above permanent.......: 67.50 ft Reference G..............: 1000.00 mGal DF above permanent.......: -50000.00 ft Reference H..............: 1000.00 HCNT Reference Dip............: 0.00 degrees ----- Vertical section origin---------------- Tolerance of G...........: (+/-) 2.50 mGal Latitude (+N/S-).........: 0.00 ft Tolerance of H...........: (+/-) 6.00 HCNT Departure (+E/W-)........: 0.00 ft Tolerance of Dip.........: (+/-) 0.45 degrees ----- Platform reference point--------------- ----- Corrections --------------------------- Latitude (+N/S-).........: -999.25 ft Magnetic dec (+E/W-).....: -57252.81 degrees Departure (+E/W-)........: -999.25 ft Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: -57252.81 degrees Azimuth from rotary table to target: 279.40 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N)........: No degree: 0.00 [(c)2001 Anadrill IDEAL ID6_1C_10] ANADRILL SCHLUMBERGER Survey Report 17-Aug-2001 01:56:45 Page 2 of 2 === ======== ====== ======= ====== ======== ======== ================ =============== ===== ===== ====== Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type === ======== ====== ======= ====== ======== ======== ================ =============== ===== ===== ====== 1 9462.00 39.20 334.20 0.00 8670.25 2463.64 -158.75 -2523.45 2528.44 266.40 0.00 TIP - 2 9499.00 46.80 333.00 37.00 8697.29 2478.40 -136.17 -2534.68 2538.33 266.92 20.66 MWD - 3 9532.00 53.00 330.00 33.00 8718.54 2493.92 -114.02 -2546.74 2549.29 267.44 20.03 MWD - 4 9562.00 57.00 326.00 30.00 8735.75 2510.18 -93.20 -2559.77 2561.47 267.91 17.23 MWD - 5 9598.00 59.20 319.60 36.00 8754.79 2532.38 -68.89 -2578.25 2579.17 268.47 16.28 MWD - 6 9631.00 60.40 315.10 33.00 8771.39 2554.87 -47.93 -2597.57 2598.02 268.94 12.33 MWD - 7 9661.00 63.10 309.20 30.00 8785.60 2577.09 -30.22 -2617.16 2617.34 269.34 19.52 MWD - 8 9693.00 66.50 305.50 32.00 8799.23 2602.66 -12.67 -2640.18 2640.21 269.73 14.91 MWD - 9 9723.00 72.40 303.70 30.00 8809.75 2628.07 3.27 -2663.30 2663.30 270.07 20.45 MWD - 10 9753.00 77.90 302.00 30.00 8817.44 2654.66 18.99 -2687.65 2687.72 270.40 19.13 MWD - 11 9783.00 81.50 304.50 30.00 8822.80 2681.65 35.17 -2712.33 2712.55 270.74 14.53 MWD - 12 9813.00 83.40 308.50 30.00 8826.75 2708.12 52.86 -2736.22 2736.74 271.11 14.66 MWD - 13 9843.00 84.50 313.50 30.00 8829.91 2733.52 72.42 -2758.73 2759.68 271.50 16.97 MWD - 14 9873.00 85.80 318.00 30.00 8832.45 2757.58 93.83 -2779.58 2781.17 271.93 15.56 MWD - 15 9903.00 86.40 318.60 30.00 8834.49 2780.88 116.18 -2799.49 2801.90 272.38 2.83 MWD - 16 9933.00 86.70 313.50 30.00 8836.29 2804.89 137.73 -2820.27 2823.63 272.80 17.00 MWD - 17 9978.00 88.70 302.80 45.00 8838.11 2844.26 165.46 -2855.58 2860.37 273.32 24.17 MWD - 18 10010.00 91.90 306.30 32.00 8837.94 2873.22 183.60 -2881.93 2887.77 273.65 14.82 MWD - 19 10062.00 94.80 312.30 52.00 8834.90 2918.19 216.46 -2922.08 2930.08 274.24 12.80 MWD - 20 10093.00 95.20 317.20 31.00 8832.19 2943.37 238.19 -2944.00 2953.62 274.63 15.80 MWD - 21 10157.00 96.70 312.30 64.00 8825.56 2995.27 283.00 -2989.19 3002.56 275.41 7.97 MWD - 22 10176.00 97.80 309.50 19.00 8823.16 3011.34 295.33 -3003.44 3017.92 275.62 15.72 MWD - 23 10204.00 96.60 308.10 28.00 8819.65 3035.54 312.74 -3025.08 3041.21 275.90 6.56 MWD - 24 10230.00 94.10 306.00 26.00 8817.22 3058.47 328.33 -3045.74 3063.39 276.15 12.53 MWD - 25 10254.00 91.10 306.70 24.00 8816.14 3079.84 342.54 -3065.05 3084.13 276.38 12.84 MWD - 26 10312.00 91.70 292.90 58.00 8814.71 3134.05 371.29 -3115.24 3137.29 276.80 23.81 MWD - 27 10333.00 91.90 289.30 21.00 8814.05 3154.60 378.85 -3134.82 3157.63 276.89 17.16 MWD - 28 10370.00 90.53 281.11 37.00 8813.27 3191.37 388.54 -3170.49 3194.21 276.99 22.44 SP - 29 10445.00 90.53 281.11 75.00 8812.57 3266.34 402.99 -3244.08 3269.01 277.08 Proj MWD - [(c)2001 Anadrill IDEAL ID6_1C_10] e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LascrFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc (a /Yl,,^-_.~ ~ 0 ~ DATA SUBMITTAL COMPLIANCE REPORT 2/26/2004 Permit to Drill 2011450 Well Name/No. PRUDHOE BAY UNIT S-17B MD 10445 .- Completion Date 2/8/2002-- Completion Status TVD 8882 ."., -.------ --------- --------- ----- -------- -------------- ------------ -------..------------- REQUIRED INFORMATION Mud Log No Samples No ------------------------ --- Log Log Run Interval OH / Scale Media No Start Stop CH Received Comments ------------- ------------------------------------------------------------------..--- -- -------"- - - --..- --------- - 00_- -"--ì 1 10216 10418 Open 12/7/2001 1 9451 10317 Open 6/20/2002 1 10215 10415 Open 12/7/2001 1 9451 10317 Open 6/20/2002 Well Bore Profile 1 9451 1 0317 Open 6/20/2002 9451 1 0317 Open 6/20/2002 9451 10317 Open 6/20/2002 Well Bore Profile Open 10/4/2001 Directional Survey Digital Data -------------- --------~----- DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name __--_00-- -----------------.....--- ----------..-- -ro-- C ~573 <3~l1'lrDCiRay' D ~932 ,..ro573 ~maRay ~l11ma Ray ~¿'~~Œ: 25 8S 25 8M 25 8M 25 8M 25 8M og ~ ~ ~ ~ D~ - ,9J.rectional Survey D - - - -. -- - -. . - - - .. - - .. .. - - LlS,Verifiåatioh'.-_. Vf6656S$eNôtê~> Bt(ectional Survey ----.----..--------..----------------------...--------------------.--- --..-------...-----.....--- -- . '------"--------.-- .------- ------ -------------..------------.. Well Cores/Samples Information: Name Interval Start Stop Sent ADDITIONAL INFORMATION Well Cored? Y ¡~ Operator BP EXPLORATION (ALASKA) INC Sjed ,~~, API No. 50-029-21148-02-00 P&A Current Status P&A UIC N - ----------'--'-------______00______---..-------- -----------.----------------------------------..----------_00___- ---..-- ---- Directional Survey No ------------------ (data taken from Logs Portion of Master Well Data Maint) ( 1 FINAL 1 1 FINAL 9451 7875 1 0317 Open 6/20/2002 9429 Case 2/19/2002 Open 10/4/2001 coil flag Directional Survey Paper Copy ( Received Sample Set Number Comments Chips Received? - Y I N Daily History Received? 'Gs/ N cÞ/N Formation Tops Analysis Received? ~ ----- - --.. ----..-- -----.------ - - ------.---------------------------"---------------"-'--..-------------------- -- ...----------------------.--.-------------------- _.------------.- ----"-------.-----.--.....----..----------- .-- _...- . - -._-- - - - . ---- -- "-""'---'-.. -- - -- --. -..- ------... --------- -- '-------- ..----...--...-------------------------- -------------_..- .. - ------- - -----'--- -- -.. DATA SUBMITTAL COMPLIANCE REPORT 2/26/2004 Permit to Drill 2011450 Well Name/No. PRUDHOE BAY UNIT S-17B Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21148-02-00 MD 10445 TVD 8882 Completion Date 2/8/2002 Completion Status P&A Current Status P&A UIC N Comments: ~omPliance ;:'viewed By: - -~ -----._--- Date: - / ~ ~ciJi::ð_-tj.. -------.----- ( ( ( PLTIGGI1'-1G ,.. ~ f LOCATION CLEF_~L~CE REPORT State of .i-_laska ~Xà or:. . ~ C::NSr;xvA'I'ICN CCMMISSION ~ell ~ra!11e ::"rn ~o.I;VI-1 ~S- :ease AD L~ d ~L ú/C) :;;¿ II t..{ð~(j 0 B l1-~5 ~'I'7ß \{Qt':'".,--O:-":..- """..... ,:,,': ~ Co' .:'.-':--' '\."-.0. .--.-- ----- - - - ---. :CCa.t:'CIl Cper2.t:= SP~ci: 1L.h.2 J Abnd Completed ~ I \iÞ7 !Jat~ ,? . O~ ~-O~, U¡ ItS l{ ~er: ~:ar7a~s - C:p8: well head Sfc C~q: :'cnq C~q: !.iner: Rev:.ew t.::.e well =~le, and' comm.ent ~Qca:~cn C~earance: 0:2 (06 7 Well ~.ad ~~t of~: ' Marxer ~C8t cr plata: Conclusions: Cod. !l ( V', / ~ \¡? ~lÑ\ ~ ~igneci S /Y) cJ7( ClhV ~ ~Date ;}f ~¡¿ 02 " . " ( ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well 0 Oil 0 Gas 0 Suspended a Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2204' SNL, 712' EWL, SEC. 35, T12N, R12E, UM At top of productive interval 2178' SNL, 18881 WEL, SEC. 34, T12N, R12E, UM At total depth 1811' SNL, 2533' WEL, SEC. 34, T12N, R12E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 67.48' ADL 028258 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 8/6/2001 8/16/2001 2/8/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 10445 8882 FT 10445 8882 FT 0 Yes a No 22. Type Electric or Other Logs Run MWD, GR, RES 23. CASING SIZE 20" X 30" 13-3/8" 9-518" Classification of Service Well : \'; :' " 7. Permit Number 201-145 301-250 & 302-014 8. API Number 50- 029-21148-02 9. Unit or Lease Name Prudhoe Bay Unit J~¡ , .. """""'!'I...~......,~,..... 1 O. Well Number 5-17B 11. Field and Pool Prudhoe Bay Field 1 Prudhoe Bay Pool 15. Water depth, if offshore 16. No. of Completions NI A MSL Zero 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1900' (Approx.) WT. PER FT. Insulated 72# 47# 26# GRADE Conductor L-80 L-80 NT13Cr-80 ASING, liNER AND CEMENTING RECORD ETTING DEPTH HOLE Top BOTTOM SIZE CEMENTING RECORD Surface 110' 36" 8 cu ds Concrete Surface 2663' 17-1/2" 3255 cu ft AS III, 465 cu ft AS II Surface 8300' 12-1/4" 1935 cu ft Class 'G' 8035' 9450' 8-1/2" 51 cu ft Class 'G' AMOUNT PULLED 7" 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) None 25. TUBING RECORD SIZE DEPTH SET (MD) 4-1/2", 12.6#, NT13Cr80 8084' PACKER SET (MD) 8002' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 9475' Set Open Hole Whipstock (Just above top of cut 2-7/8" Liner) P&A with 26.5 Bbls Class 'G' 9450' 27. Date First Production Not on Production Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) NIA PRODUCTION FOR TEST PERIOD Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE OIL-BBL GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO OIL-BBL GAs-McF WATER-BBL OIL GRAVITy-API (CORR) 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Subm '0 hi. ' .\ -- ",", jj",~ No core samples were taken. APP, 1 9 2002 Form 10-407 Rev. 07-01-80 Alaska Oil g, GLii; ;..,;):.¡I\,¡¡~i,S¡(h AHc!'¡¡)raÎJ~:i: r.,f Submit In Duplicate ~" i{ 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOA, and time of each phase. Sag River 9451' 8729' Shublik 9499' 8765' Sadlerochit I Zone 4 9670' 8857' RE"'I""~I".W\/FD .' ,"' [j ..\f ~.~ ~;j...,,~ " :¡. ~ \~- ".~ ¡- ""' r"\ "" 0 ? M1 ? .~~/¡...,í. ! "} ¡...\¡Vl.~ A1as!<a 011 & Gas Cons. CommiSsiOf¡ Anchorage Summary of abandonment operations. (Summary of failed drilling operations attached to 10-404 Dated 10/02101.) 32. J hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble Title Technical Assistant 31. List of Attachments: Date 0 S-178 Well Number 201-145 301-250 & 302-014 Permit No. I A roval No. Prepared By Name/Number: Terrie Hubble, 564-4628 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut~ln, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 f (\ f I' I: I: t. I,: ( r I; I i:....... Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 7/30/2001 7/31/2001 8/1/2001 8/2/2001 ( ( Page 1 of 11 BP EXPLORATION Operations Summary Report 8-17 S-17B REENTER+COMPLETE NABORS NABORS 3S From - To Hours Activity Code NPT 00:00 - 00:00 03:30 - 10:00 10:00 - 15:00 15:00 - 22:00 22:00 - 00:00 00:00 - 03:00 03:00 - 04:00 04:00 - 05:00 05:00 - 10:00 10:00 - 10:30 10:30 - 11 :30 11 :30 - 13:45 13:45 - 15:00 15:00 - 18:15 18:15 - 20:00 20:00 - 22:30 22:30 - 00:00 00:00 - 02:30 02:30 - 03:26 03:26 - 03:30 03:30 - 05:30 05:30 - 08:30 08:30 - 11 :00 11:00 -15:00 15:00 - 16:30 16:30 - 18:15 18:15 - 18:30 18:30 - 18:45 18:45-20:15 20:15 - 21:36 24.00 6.50 RIGU 5.00 RIGU P 7.00 RIGU P 2.00 RIGU P 3.00 RIGU P 1.00 BOPSUR P 1.00 BOPSUR P 5.00 BOPSUR P 0.50 BOPSUR N 1.00 BOPSUR N 2.25 BOPSUR P 1.25 BOPSUR P 3.25 BOPSUR P 1.75 BOPSUR N 2.50 BOPSUR N 1.50 BOPSUR P 2.50 BOPSUR P 0.93 BOPSUR P 0.07 KILL P 2.00 KILL P 3.00 KILL 2.50 KILL 4.00 KILL 1.50 KILL 1.75 KILL 0.25 KILL 0.25 KILL 1.50 KILL 1.35 KILL Phase P P PRE PRE DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP SFAL DECOMP HMAN DECOMP DECOMP DECOMP DECOMP SFAL DECOMP SFAL DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP N DPRB DECOMP N DPRB DECOMP N DPRB DECOMP N DPRB DECOMP N DPRB DECOMP N N N N DPRB DECOMP DPRB DECOMP DPRB DECOMP DPRB DECOMP Start: 7/30/2001 Rig Release: 8/18/2001 Rig Number: Spud Date: 8/6/1984 End: 8/18/2001 Description of Operations Summer rig mods. Nabors 3S rig arrived on'S' Pad at 03:30 hours. Spot rig and pits. RU. Accept rig 15:00 hrs 7/31/01. NU BOPE. Take on KCL water. Continue RU. Wait on DS and lubricator. MIRU DS #4. Install riser. Full body test on stack. No visual leaks. Pull BPV. Set TWC. WHP = 550 psi. PT BOPE. Unable to get high pressure test on variable rams (2-3/8" test jt). Closed upper 2-3/8" PIS on 3-1/2" test sub. Replace and retest rams. Variables tested OK with 3-1/2" test sub. Continue with BOP test. Retest variables with 2-3/8" test joint. Good flat line. Continue with choke manifold test. Pinhole 2" HP choke flexline. Find replacement. Stab ROC. Install CTC. Pull test. Wait on choke line. NU to stack. MU and PT BHA #1 (3" nzl, 3.375" disconnect, & 3.125" checks). PT coil side from ROC to stack. Finish choke flexline MU. Test new line. Continue BOPE test. Complete BOPE test.. Pull TWC. Injector on well PT surface. Rih w/ BHA#1w/ choke closed. SIWhp= 550 psig. At 1500' find btm of gas head and begin circ kill taking returns to tiger tank. Liquid to surface. PU Wt 39k @ 7000'. Continue circ in hole to 7954'. No returns at 2.0 BPM circulating. Fill hole across top of stack and monitor losses. Losing 120 - 140 BPH. Mix and pump 35 bbl pill of 3.5 ppb biozan. Circ to end of coil, BH down to perfs, switch back to filling and monitor losses. No improvement. Out of KCL. SI well and wait on more KCL and high LSRV mud pill. WHP up to 40 psi. Fill hole across top again with KCL to check losses. Losses still hanging in there at about 120 - 150 BPH losses. Wait on mud (have to use KCL truck -- no other trucks available). Circulate 300 bbls 150k LSRV Flo-Pro mud into well, bullheading 2-7/8" liner volume to perfs. Circulating 3.0 BPM in and 0.5 BPM out. No improvement in losses. POOH for big hole nozzle. Mix MI seal, OM, and Mix II pill. Losses slowing down while POOH. Park at 3800'. Check returns 1.8 in; 0.5 out. Continue POOH. Never got new mud back to surface. Bump up. Close master. Crew change safety meeting. Change-out nozzle with big hole nozzle. Stab back on. Fill hole and monitor static losses. Losses are 12 bbls per hour. Printed: 10/2/2001 9:49:38 AM (' ( BP EXPLORATION Page 2 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-17B Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/2/2001 21 :36 - 23:30 1.90 PULL P DECOMP Break off nzl. MU BHA#2 (liner fishing string). 23:30 - 00:00 0.50 PULL P DECOMP Rih wI BHA# 2(fishing string). 8/3/2001 00:00 - 01 :03 1.05 PULL P DECOMP Continue running in hole w/ BHA #3. 01:03 - 01:12 0.15 PULL P DECOMP PU wt. 42.5k. Latch top of cut liner @ 8046'. Pu1l6.5k over and fire jars. Pull 12.5k over and fire jars. Liner is free. 01:12 - 02:45 1.55 PULL P DECOMP Pooh w/liner. Surface. Monitor for flow. 02:45 - 06:00 3.25 PULL P DECOMP Lay down fishing TS. Lay down 7 jts of 2-7/8" liner. 06:00 - 06:30 0.50 PULL P DECOMP Crew change safety meeting. 06:30 - 07:30 1.00 PULL P DECOMP Continue LD of 2-7/8" liner. 07:30 - 07:45 0.25 PULL P DECOMP BOP drill. 07:45 - 10:00 2.25 PULL P DECOMP Continue LD of 2-7/8" liner (Total 33 jts + 2 pups of 8rd; 1 XO jt; 13 jts STL; 1 cut jt STL 19.5' long.) Clear floor of handling tools. Check static losses -- about 5 bbls per hour. 10:00 - 12:30 2.50 STWHIP P PROD1 Unstab ROC. Restab E-line coil. RU for reversing (slack management). 12:30 - 13:30 1.00 STWHIP P PROD1 Reverse at 3 BPM. 13:30 -14:30 1.00 STWHIP P PROD1 Pump forward. 14:30 - 15:45 1.25 STWHIP P PROD1 Oops. Forgot to rehead first. Reverse again, cut back pipe (30'), rehead, pump forward. 15:45 - 17:30 1.75 STWHIP P PROD1 Head-up E-line CTC and tools. 17:30 -19:00 1.50 STWHIP P PROD1 MU open hole clean-out BHA #3 (1.5 deg motor; used DS49). 19:00 - 21:00 2.00 STWHIP P PROD1 Rih w/ BHA #3. No restrictions. No trouble thru old window section from 9450-9456'. Between 30-45 bbls FLI Hr. Order out more FLO-Pro. 21 :00 - 22:30 1.50 STWHIP P PROD1 Tie into Sperry-Sun Driling Services MWD dated 11-0CT-91. Flag EOP @ 9216'. 22:30 - 00:00 1.50 STWHIP P PROD1 Pooh. 8/4/2001 00:00 - 00:30 0.50 STWHIP P PROD1 Continue POOH w/ BHA #3. Surface. 00:30 - 01:15 0.75 STWHIP P PROD1 LD BHA #3 01:15 - 02:00 0.75 STWHIP P PROD1 PU BHA #4 (OH Whipstock AL KO Plug/ BOT Mechanical Release (28k)/& OXP). 02:00 - 02:30 0.50 STWHIP P PROD1 Function testing tools. 02:30 - 03:00 0.50 STWHIP N SFAL PROD1 Repeat tool testing. Inclinometer not working. However, will not need that feature to set OH whipstock. Decide to RIH. 03:00 - 04:30 1.50 STWHIP P PROD1 RIH w/ BHA #4. 04:30 - 05:00 0.50 STWHIP N SFAL PROD1 Encoder broke @ surface. Standby for repair. 05:00 - 05:30 0.50 STWHIP P PROD1 Continue in the hole w/ BHA#4. Correct @ flag to 9293' (EOP is 9216'+77' tools). 05:30 - 05:50 0.33 STWHIP P PROD1 Tie-in at 9260' GR spike. Correct depth (+3'). Circ sub opens/closes slow. 05:50 - 06:15 0.42 STWHIP P PROD1 RIH to OH Plug Aluminum Kick off Plug setting depth. Pressure up slowly on coil to 3200 psig. Set Top of Plug @ 9475'. Set down 10k on plug--Good. PUH above window. Circulate at 1.8 BPM. Full returns. 06:15-07:15 1.00 STWHIP N DFAL PROD1 Wait on circ sub to open. Something still wrong with it. Very slow to open. Lost patience. Close it. 07:15 - 09:00 1.75 STWHIP P PROD1 POOH. 09:00 - 09:45 0.75 STWHIP P PROD1 LD whipstock setting tool. 09:45 - 11: 15 1.50 STWHIP N DFAL PROD1 PU different OXP and EDC and test tools. 11: 15 - 11 :45 0.50 STWHIP P PROD1 MU BHA #5 (2.7 deg motor; M09) 11 :45 - 13: 15 1.50 STWHIP P PROD1 RIH. 13:15 - 13:30 0.25 STWHIP P PROD1 Log tie-in at 9260' GR spike. Correct depth (-5'). 13:30 - 15:15 1.75 STWHIP P PROD1 RIH and dry tag 9476'. Down ream from 9470' to billet at 50L, Printed: 10/2/2001 9:49:38 AM ( ( BP EXPLORATION Page 3 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-17B Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/4/2001 13:30 -15:15 1.75 S1WHIP P PROD1 0.5 FPM, 2.4/3400. Tag whipstock and mill-off 200 psi motor work. Repeat downream. Continue milling down at about 0.3 FPM, 100 psi motor work to 9500'. Steady milling. Looks like we're below anchor and in new hole. Back ream window twice. Minimal motor work. Dry tag clean at 9500' 15:15 - 16:15 1.00 S1WHIP N STUC PROD1 PUH and could not get past 9445' (top of other window). Clean SO. Open circ sub and circulate 3.0 BPM. Wash window. Still can't get past. Pull to 18k over. Grabbed a little on SO. Close circ sub. PUH at minimum rate. Stall. Attempt to work thru at various TF's. Pulled thru clean with TF pointing straight down. 16:15 -18:15 2.00 S1WHIP P PROD1 POOH. Tools shorted-out at 9280'. Continue POOH. 18:15 -18:30 0.25 S1WHIP N DFAL PROD1 OOH. Find EDC had disconnected. 18:30 - 23:00 4.50 S1WHIP N DFAL PROD1 Call Baker. Unstab E-coil & stab Roc coil. Get fishing x-overs together, etc. 23:00 - 00:00 1.00 S1WHIP N DFAL PROD1 MU BHA#6 (fishing string w/ 3" GS spear). MU CTC. Pull test CTC to 30k. Start working on the next fishing spear. May need to orient 180 to get past the old window with bit? 8/5/2001 00:00 - 01 :00 1.00 S1WHIP N DFAL PROD1 Finish MU and test of BHA #6, OXP fishing string. 01 :00 - 02:50 1.83 S1WHIP N DFAL PROD1 RIH w/ BHA #6. 02:50 - 03:20 0.50 S1WHIP N DFAL PROD1 PU wt 42k. Set down on fishing neck @ 9438' uncorrected depth. PU weighing 46k. Puh to old window. Pull to 50k. Stop. Rih. Puh at faster speed. Pull 55k. Slack off. Pull 60k. Jars fired. Pooh w/2k over. (Fish on). 03:20 - 05:00 1.67 S1WHIP N DFAL PROD1 Pooh w/ fish. Slight overpull @ GLM station #3. 05:00 - 07:00 2.00 S1WHIP N DFAL PROD1 Breakdown fishing string. Retrieved all fish. LD tools. Bit OK -- 2 small chips on gage cutters. Test OXP that was fished -- flaky. Have one OXP left. 07:00 - 08:00 1.00 S1WHIP N DFAL PROD1 Discuss game plan. 08:00 - 10:00 2.00 S1WHIP N DFAL PROD1 Unstab ROC. Stab E-line coil. Slack management -- reverse circulate. Cut back 25' of coil. 10:00 -12:30 2.50 S1WHIP N DFAL PROD1 Rehead. 12:30 - 14:00 1.50 S1WHIP N DPRB PROD1 PT connector. MU BHA #7 (1.5 deg motor; string mill; DSM). 14:00 - 16:00 2.00 S1WHIP N DPRB PROD1 RIH. Sat down in #3 and #2 GLM's. Orient high side to get thru. 16:00 -16:15 0.25 S1WHIP N DPRB PROD1 Log tie-in. Correct depth (-5'). 16:15 -17:00 0.75 S1WHIP N DPRB PROD1 RIH. Stall at 9450' with highside TF. Try to work thru window dry at different TF's. No go. 17:00 -18:00 1.00 S1WHIP N DPRB PROD1 Ease into it with pumps. Stall twice, then got steady milling for about 1'. Mill to 9460'. Backream, no motor work. Make another pass down. Minimal work down and up. RIH dry -- clean. Position TF at 60L. Clean thru window here, also. Did not tag TD. 18:00 -18:30 0.50 S1WHIP N DFAL PROD1 PUH above window and reboot in attempt to get DWOB working. Nope. "Measure unit" (uppermost portion of OXP tool) bad. Just effects pressures and weight. No backup OXP. 18:30 - 20:00 1.50 S1WHIP N DFAL PROD1 POOH. 20:00 - 20:30 0.50 S1WHIP N DFAL PROD1 Surface. LD BHA#7. 20:30 - 21 :00 0.50 DRILL N DFAL PROD1 PU BHA#8 (3.75" DS49 PDC bit-serial #H47138/ Navidrill Extreme motor w/1.6 deg bent sub). 21 :00 - 23:00 2.00 DRILL N DFAL PROD1 Rih w/ BHA #8. 23:00 - 23:30 0.50 DRILL N DFAL PROD1 Tie into Sperry Sun MWD dated 11-0CT-91(-13'). 23:30 - 00:00 0.50 DRILL P PROD1 Dry tag @ 9482'. Can't get in. Repeat efforts dry. Nogo. Printed: 10/2/2001 9:49:38 AM t \ BP EXPLORATION Page 4 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-17B Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/5/2001 23:30 - 00:00 0.50 DRILL P PROD1 Take a run at it with pumps. No go. Drill from 9482' with 50L TF. Did not skip in. Starting new hole. 8/6/2001 00:00 - 03:00 3.00 DRILL P PROD1 Drill ahead from 9500 to 9509'. Stall. Backream to 9480'. Rih and dry tag. FS motor is 3250 pisg @ 2.4 bpm. Grab sample from 9550' (Grab samples every 50'). Drill ahead to 9601'. 03:00 - 03:15 0.25 DRILL P PROD1 Short trip minimum rate from 9601'-9525' for survey data confirmation. 03:15 - 05:00 1.75 DRILL P PROD1 Drill ahead from 9601'-9618. ROP is 43 fph. 05:00 - 06:45 1.75 DRILL P PROD1 Depth-9675'. ROP is 50 fph. At 9700', into 24 w/ ROP up to 100 fph. Drill to 9800'. 06:45 - 07:15 0.50 DRILL P PROD1 Wiper trip to 9600'. 07:15 - 09:15 2.00 DRILL P PROD1 Drill to 9975'. OXP tools quit working. 09:15 - 10:00 0.75 DRILL N STUC PROD1 Drill to 9977' and got differentially stuck. Work pipe. Order crude. Let relax for 15 minutes. Pull to 85k and pulled free. 10:00 -12:00 2.00 DRILL N DFAL PROD1 POOH for OXP. Clean through KO plug and window. 12:00 -13:30 1.50 DRILL N DFAL PROD1 Change-out OXP (to slope rebuild #1 of 2). Adjust motor to 1.4 deg. Add resistivity tool. Check tools. Can't read OXP from computer (worked on ground but not in the air). 13:30 -15:00 1.50 DRILL N DFAL PROD1 Change-out OXP again (to slope rebuild #2). Check tools. This OXP also has the "measuring unit" not working, just like the tool we were drilling with before it quit completely. No other rebuilds available. 15:00 -16:00 1.00 DRILL N DFAL PROD1 RIH. Tools shorted at 3500'. POOH. 16:00 - 18:00 2.00 DRILL N DFAL PROD1 Troubleshoot. Short is in USMPR. Swap to last available USMPR. 18:00 - 19:00 1.00 DRILL N DFAL PROD1 RIH with BHA #10. Tools would not communicate @ 2300'. 19:00 - 19:40 0.67 DRILL N DFAL PROD1 POOH to trouble-shoot. 19:40 - 00:00 4.33 DRILL N DFAL PROD1 Trouble-shoot. Check communications w/ OXP. Problem found from EDC back to unit. Check line from head back. Ok. Change out drop connector. Check wet connect good. Suspect line. Rehead (Using one of the outer conductors). 8/7/2001 00:00 - 03:30 3.50 DRILL N DFAL PROD1 BHI technicians completed rehead and still have communications problems w/ tools below EDC. They function properly when test sub is on, however will not communcate when made up to coil. Take off resistiviy tool. No change. Suspect the measuring sub in OXP, but no guarentees. Will not have the new ones in until 1300 hrs. At 0330 hrs, no new thoughts what is wrong--Time to make a change!!! 03:30 - 07:00 3.50 DRILL N DFAL PROD1 Mobilize MWD mud-pulse system equipment. BHI to continue to work on tools. 07:00 - 12:00 5.00 DRILL N DFAL PROD1 Lay Down OXP equipment. Unstab e-line coil. Stab ROC. MU MHA. Pull test. Spot MWD shack. Gather tools. Wait on non-mag collar from tuboscope. 12:00 -15:00 3.00 DRILL N DFAL PROD1 Wait on tools. 15:00 -17:45 2.75 DRILL N DFAL PROD1 M/U BHA #9. ( MWD stabilizer OD larger than non-mag collar ID by 1/16", ground down to fit) Surface test MWD and Res. tool. 17:45 -19:00 1.25 DRILL N DFAL PROD1 TIH. Check tools 300'. Resistivity not looking good. 19:00 -19:50 0.83 DRILL N DFAL PROD1 Pooh to check resistivity. 19:50 - 21 :00 1.17 DRILL N DFAL PROD1 Test tools. Look good. 21:00-21:50 0.83 DRILL N DFAL PROD1 Rih to 2100'. Roc unit running high temperature. 21 :50 - 00:00 2.17 DRILL N SFAL PROD1 Stop and allow Roc unit to cool off. Call mechanics out to Printed: 10/2/2001 9:49:38 AM ( , BP EXPLORATION Page 5 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-17B Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 35 Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/712001 21 :50 - 00:00 2.17 DRILL N SFAL PROD1 repair fan clutch. 8/8/2001 00:00 - 01 :00 1.00 DRILL N SFAL PROD1 Mechanics arrive and repair fan clutch. 01 :00 - 02:00 1.00 DRILL N DFAL PROD1 Roc unit repaired Rih. 02:00 - 03:00 1.00 DRILL P PROD1 Tie in. 03:00 - 03:40 0.67 DRILL P PROD1 RIH tag bottom 9978'. 03:40 - 05:20 1.67 DRILL P PROD1 Orient 65L. 05:20 - 08:30 3.17 DRILL P PROD1 Drill horizontal ahead fl 9978' to 10104'. Survey results are not consistent with TF orientation 120 degrees off. Also most of the signals recieved from the resistivity tool are not being processed by the computer at surface. This may be caused by noise or some downhole tools problem. 08:30 - 11 :30 3.00 DRILL N HMAN PROD1 TOH to check TF and rebuild res. tool. Called AOGCC and will do BOP test at this time. 11:30-12:15 0.75 DRILL N HMAN PROD1 UD BHA #11. TF out by 105 deg. Rebuilding MWD/Res tool. 12:15 -12:45 0.50 DRILL P PROD1 Set 2-way check and prep to test BOPE 12:45 - 13:45 1.00 DRILL P PROD1 Setback injector. Broken weld on injector. Welder to repair while down for BOPE test. 13:45 - 20:30 6.75 DRILL P PROD1 Test BOPE. AOGCC inspector Lou Grimaldi on location. 20:30 - 22:30 2.00 DRILL P PROD1 Waiting on crew to pull 2-way check (currently on Doyon 14 at S-Pad) Get ready to Pu BHA #12. 22:30 - 23:00 0.50 DRILL P PROD1 DSM pulling two-way check. 23:00 - 00:00 1.00 DRILL N HMAN PROD1 MU BHA#12. 8/9/2001 00:00 - 02:15 2.25 DRILL N HMAN PROD1 Continue MU of BHA#12. (Break down Resistivity Tool and replace spring conductors--Hard time breaking sub, overtorqued). Finish MU. 02:15 - 03:00 0.75 DRILL N HMAN PROD1 Test tools on surface. Good--Iooks better than yesterday. 03:00 - 03:30 0.50 DRILL N HMAN PROD1 RI H to 400' for tool test. 03:30 - 04:00 0.50 DRILL N HMAN PROD1 Tools function test ok. 04:00 - 05:30 1.50 DRILL N HMAN PROD1 RIH 05:30 - 09:55 4.42 DRILL N HMAN PROD1 Tie-in at 9450' without success. Will try at 9260'. Weak pulses from the MWD « 5 psi when 50-100 psi normal) and orienter not responding. Moving up hole to upper tie-in point. Starting to get responce from orienter but pulses still weak from MWD. Cleaned out transducer on standpipe and checked surface cables for any moisture (rained lastnight) but nothing found. Still very weak pulses. Will trip for new pulser/MWD and replace orienter. 09:55 - 12:00 2.08 DRILL N DFAL PROD1 TOH for MWD pulsar. 12:00 -12:45 0.75 DRILL N DFAL PROD1 UD BHA and surface test orienter. Seems fine click for click. 12:45 -13:30 0.75 DRILL N DFAL PROD1 P/U new orienter and surface test-ok. Dump MPR memory data. Could not communicate with MPR. 13:30 -16:30 3.00 DRILL N DFAL PROD1 Wait on new MWD parts. (delay at Kuparuk bridge) 16:30 -19:10 2.67 DRILL N DFAL PROD1 Make repairs to MWD tools. P/U BHA#13 (80.21'). Calibrate and surface test MWD-ok. 19:10 -19:20 0.17 DRILL N DFAL PROD1 Stab on injector. 19:20 -19:30 0.17 DRILL N DFAL PROD1 RIHt0411'. 19:30 -19:45 0.25 DRILL N DFAL PROD1 Shallow test MWD 19:45 - 21:20 1.58 DRILL N DFAL PROD1 Rih to tie-in point. 21:20 - 21:50 0.50 DRILL N DFAL PROD1 Tie-in @ the 9260'(-8') spot. 21 :50 - 22:30 0.67 DRILL N DFAL PROD1 Rih and tag btm @ 10104.6'. 22:30 - 00:00 1.50 DRILL N DFAL PROD1 Start to orient wI goal of TF 90L. Orienter didn't respond on first two series of attempts. Finally starting to get response. Printed: 10/2/2001 9:49:38 AM (' ( BP EXPLORATION Page 6 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-17B Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/912001 22:30 - 00:00 1.50 DRILL N DFAL PROD1 Orient 65L. Wait and see what reactive we have. 8/10/2001 00:00 - 02:15 2.25 DRILL P PROD1 Drill from 10104.6' at 90L. Relying on reactive torque to bring toolface to 90L. Stall 10106'. ROP is - 40 fph. Drill ahead. 02:15 - 03:20 1.08 DRILL P PROD1 At 10188'. Lost reactive torque. Orient. Grab 10150' sample. (Fluid loss 8 bbls/2hrs). PU wt 43k off btm. 03:20 - 04:30 1.17 DRILL P PROD1 FS @ 2.5 bpm is 3500 psig. SOW is 20k. WOB 4-5k. Drill ahead wI 320 psig motor work. Losses still 4 bbll hr. Drill down to 10253'. Losses up to 1 bpm. Call MI for Mud. Monitor losses. Losses @ 50 bph- steady. Find 13/16" ball. 04:30 - 05:15 0.75 DRILL N DPRB PROD1 Wiper trip complete. Pull up to liner. Aggetate previously mixed pill (8sks MI seal, 24 sks OM seal, & 18 sks Mix II in 35 bbls pill) . 05:15 - 08:15 3.00 DRILL N DPRB PROD1 Short injectivity test. Pump 5 bbls @ 0.7 bpm wI 450 psig. .Circulate and monitor loss. Losses are down to 30 bph. Perfom 2nd injectivity test 5 bbls 0.7 bpm wI 450 psig. Launch 13/16" ball to open circ-sub. Open circ sub pump and lay-in 32 bbl LCM pill. Close annulus and squeeze 3-4 bbls LCM pill to formation .4 bpm at 550 psi max. Unable to squeeze away more without going higher on pressures. (Total pit volume 88 bbls) Appears that we drilled into the fault starting around 10090'. DD was having trouble maintaining TF with frequent motor stalls. Also having problems turning left to stay within the polygon and at the same drill through the fault zone rather than along the strike. 08:15 - 09:45 1.50 DRILL N DPRB PROD1 TOH to reset circ-sub and adjust motor setting. 09:45 - 10:00 0.25 DRILL N DPRB PROD1 Setback injector. 10:00 -10:45 0.75 DRILL N DPRB PROD1 Reset circ-sub and adjust motor from 1.37 to 1.60 change out MHA. 10:45 - 11 :00 0.25 DRILL N DPRB PROD1 Stab-on injector 11 :00 - 13:00 2.00 DRILL N DPRB PROD1 TIH to 430' and surface test MWD - ok. Continue TIH 13:00 - 16:00 3.00 DRILL N DFAL PROD1 Log tie-in. Receiving strong pulses from MWD but then loose all pulses until we cycle the pump again. Continue pumping and try to get in snych with signals we are receiving. We did successfully tie-in at 9260' no correction. 16:00 -17:00 1.00 DRILL N DFAL PROD1 MWD signals still fading out. Pumped 15 bbls KCL water to flush pulsar and seems to have helped. 17:00 -17:15 0.25 DRILL N DPRB PROD1 TIH and tag at 9619'. 17:15 -17:45 0.50 DRILL N DPRB PROD1 Pull up hole and orient to 60L. Getting 15 deg/click. 17:45 -18:00 0.25 DRILL N DPRB PROD1 Rih to 9690'. 18:00 - 20:10 2.17 DRILL N DPRB PROD1 Orient 40L. 20:10 - 21:25 1.25 DRILL N DPRB PROD1 Tag down 9694'. Make it past. Tag down 9742' and orient to get past. Tag down at 9763'. Work past. Tag btm @ 10254'. 21 :25 - 23:30 2.08 DRILL N DFAL PROD1 Having trouble wI orienter. Getting 1 for 6 clicks. Trying to get from right side to left side. Get weak pulse again. 23:30 - 00:00 0.50 DRILL N DFAL PROD1 Mud swap. Pulses good as new mud reaches bit. 8/11/2001 00:00 - 01 :30 1.50 DRILL N DFAL PROD1 Attempting to Orient to 85L. Difficulties getting clicks. Pull up hole to 9970', where this orinter will click. 01 :30 - 02:30 1.00 DRILL P PROD1 Drill ahead to 10274' with TF of 85L. TF kept slipping to 120L. Keep giving it one more click. Getting good click. But can't keep the TF. 02:30 - 04:35 2.08 DRILL N DFAL PROD1 Pulser became week and intermittent. Finally pulser quit. Pump 3 bbls KCL water throught toolstring. No improvement. Drilled from 10274' to 10276' before pulser quit totally. Printed: 10/2/2001 9:49:38 AM (" ( BP EXPLORATION Page 7 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-17B Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/11/2001 04:35 - 06:30 1.92 DRILL N DFAL PROD1 PUH into casing. Circulate. No pulses. POOH to check pulser and orienter. 06:30 - 12:30 6.00 DRILL N DFAL PROD1 UD BHA. (MPR tools would not break down properly. A "crush ring" - used to hold inner tools in place - was crushed to far and prevented normal separation of tools while in the table. Layed out entire tool string and seperated tools. Pulser pluged with LCM. 12:30 - 16:00 3.50 DRILL N DPRB PROD1 Decided to RIH without MPR tool and only GR tools. Spare GR tool failed to surface test. Download memory from MPR tool. Will RIH with reslgr tools and new pulser again. May have problem again with crush ring but no other backup tools on the Slope. - new pulser failed surface test. wo pulser from CDR rig. (Charter flight coming in tonight with new GR tool and misc parts) (Anadrill moblizing and could start up by Monday) 16:00 - 22:20 6.33 DRILL N DPRB PROD1 Wait on tools from CDR. Finally, luck turning our way. Found faulty "new" battery pack. Wiper plug coming to pig coil for stray LCM. BHI still checking out tools and waiting on gamma ray. 22:20 - 23:00 0.67 DRILL N DPRB PROD1 Pump dart through the roc coil. Small quantity of LCM and piece of rubber recovered off shakers. MWD still checking out tools. 23:00 - 00:00 1.00 DRILL N DPRB PROD1 Reverse mud out of e-line coil while waiting for tools. 8/12/2001 00:00 - 00:45 0.75 DRILL N DFAL PROD1 Finish reversing mud out of e-line coil. 00:45 - 01 :30 0.75 DRILL N DFAL PROD1 Dowell ET working on Nabors pump rate display to coil ops cab. Gamma Ray tool on location. MWD testing tools before make up. 01 :30 - 02:30 1.00 DRILL N DFAL PROD1 MU BHA #15 (GR, Weatherford Orienter, same 3.75" PDC bit.....No resistivity). Test on surface. Good. 02:30 - 03:00 0.50 DRILL N DFAL PROD1 RIH to 402'. Function test tools- pulses good. 03:00 - 04:20 1.33 DRILL N DFAL PROD1 RIH wI BHA #15. 04:20 - 05:00 0.67 DRILL N DPRB PROD1 At 9385'. POH to 4.5" IT pumping 2.5 bpm to chase LCM out of 7". 05:00 - 05:10 0.17 DRILL N DFAL PROD1 RIH to logging depth of 9260'. Take on 100 bbls new mud. 05:10 - 06:00 0.83 DRILL N DFAL PROD1 Log. Tied-in (-7'). 06:00 - 06:30 0.50 DRILL N DFAL PROD1 RIH to bottom - no problems with hole. 06:30 - 07:15 0.75 DRILL P PROD1 Orienting to 60-90R. 07:15 - 10:15 3.00 DRILL P PROD1 Directionally drilling ahead f/1 0276' to 10299'. 2.6 I 2.5 taking it slow to drill through fault zone and establish LH turn away from polygon hardline. Very slow Prate. 10:15-11:05 0.83 DRILL P PROD1 Wiper trip to 9600'. 11:05 -14:30 3.42 DRILL P PROD1 Drill f/10299' to 10317'. Struggling to drill ahead, good differential presssure 400+ psi but not drilling off. Finally drilling after playing with it but P rate slow. Good sand 20-25 API zone 4 sands should drill faster. Seeing small amount of stator rubber across shaker but still have good diff. pressure. Losses to hole avg 5-6 bbl/hr 14:30 - 17:00 2.50 DRILL N DPRB PROD1 TOH to inspect BHA and bit. 17:00 - 18:00 1.00 DRILL N DPRB PROD1 Change out motor and bit. 18:00 - 20:30 2.50 DRILL N DPRB PROD1 RIH wI BHA #16. 20:30 - 21 :00 0.50 DRILL N DFAL PROD1 Attempt to tie-in. Lost GR. Still have pulser and orientation pkg. 21 :00 - 23:15 2.25 DRILL N DFAL PROD1 POOH for new GR. 23:15 - 00:00 0.75 DRILL N DFAL PROD1 Change out GR. Printed: 10/2/2001 9:49:38 AM f ('" \ BP EXPLORATION Page 8 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-178 Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/13/2001 00:00 - 00:30 0.50 DRILL N DFAL PROD1 Continue MU BHA #17(same as BHA#16, wI different GR). Shallow test- good. 00:30 - 02:20 1.83 DRILL N DFAL PROD1 RIH wI BHA #17. At logging depth 9265'. Come on line for logging pass. GR not working, again. GR locked, DAS sending same number. 02:20 - 04:50 2.50 DRILL N DFAL PROD1 POOH. Test tools @ 5000'. Stop at 500' for shallow test. No Good. 04:50 - 06:00 1.17 DRILL N DFAL PROD1 LD BHI. PU Anadrill. 06:00 - 13:00 7.00 DRILL N DFAL PROD1 Rigging up Anadrill surface equipment. Blind rams closed circ across wellbore hole taking 3-4 bbllhr. 13:00 -13:20 0.33 DRILL N DFAL PROD1 PJSM wI Anadrill and all hands concerning plu of BHA and 3S working practices. 13:20 - 15:30 2.17 DRILL N DFAL PROD1 M/U BHA #18. 15:30 -16:00 0.50 DRILL N DFAL PROD1 P/U injector. 16:00 - 19:30 3.50 DRILL N DFAL PROD1 RIH to 400' shallow test tools -ok (waiting on depth encoder) continue RIH to 3500'. Test survey tools and orienter - ok. Install depth encoder to injector. Continue RIH 19:30-21:15 1.75 DRILL N DFAL PROD1 Tie-in (-11'). 21:15-21:35 0.33 DRILL N DFAL PROD1 RTIH to bottom. No problems with hole. 21 :35 - 00:00 2.42 DRILL N DFAL PROD1 Mad pass from 10313' to 10263'. On mad pass surveys are off 22 deg azi. 8/14/2001 00:00 - 02:00 2.00 DRILL N DFAL PROD1 Perform surveys through out OH. There is on average 21 deg difference between BHI & Anadrill azi. Anadrill has magnetic interference on several of surveys in build section (Will need to space geo pkg further from motor-swap wI GR and also need to reprogram tool for better data quality). 02:00 - 04:30 2.50 DRILL N DFAL PROD1 POH for tool change. 04:30 - 06:45 2.25 DRILL N DFAL PROD1 Change out faulty magnetometer and reconfigure survey tools. Move directional portion of survey tools above GR to get away from possible interference from motor. Re-program survey tools to give better data quality at surface. 06:45 - 07:05 0.33 DRILL N DFAL PROD1 Stab-on injector. 07:05 - 09:15 2.17 DRILL N DFAL PROD1 TIH to 400' shallow test - ok RIH to 9250'. 09:15 - 10:10 0.92 DRILL N DFAL PROD1 Log tie-in -11' correction. 10:10 - 10:45 0.58 DRILL N DFAL PROD1 TIH to bottom no problems. 10:45 -11:00 0.25 DRILL N DFAL PROD1 Survey on bottom. Correlates good with BHI surveys. 11 :00 - 12:40 1.67 DRILL N DFAL PROD1 Log MAD pass to tie-in with BHllogs f/10214' 12:40 - 14:05 1.42 DRILL P PROD1 Directionally drill f/1 0317' 2.5/2.4, 85'/hr 90L TF. Lost total returns at 10,389'. Drilled on to 10,396'. Zero returns. 14:05 -15:15 1.17 DRILL N DPRB PROD1 Trip into casing to 9400'. Mixing 30 LCM pill ( 12ppb OM Seal, 15ppb Mix II med, 7ppb MI Seal fine). Ordered 300 bbl mud ETA 3 hrs. 15:15 -16:20 1.08 DRILL N DPRB PROD1 RIH to 10,000' lay-in 30 bbl LCM pill 1: 1 pull to safety at 8400'. 16:20 - 19:00 2.67 DRILL N DPRB PROD1 Circulate 1.6 11.4 surface volume 55 bbls wait on new mud (arrive 1900 hrs) 19:00 - 20:45 1.75 DRILL N DPRB PROD1 Circulate min rate. Fill mud tanks and mix a 33 bbl LCM pill (5 ppb MI seal med, 7 ppb of OM seal, 15 ppb of Mix II med, 15 ppb of Mix II fine). 20:45 - 21 :00 0.25 DRILL N DPRB PROD1 Pre-job safety meeting prior to circulating pill. 21:00-21:15 0.25 DRILL N DPRB PROD1 Start pumping 33 barrel pill into coil. Coil volume is 60.1 bbls. After pumping the 33 barrel pill plus 17.8 barrels of flo-pro displacement the coil pressure increased to 3800 psi (pill still 9.3 bbls from end of coil). Bled off coil pressure and slowly Printed: 10/2/2001 9:49:38 AM ( '( BP EXPLORATION Page 9 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-17B Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/14/2001 21:00-21:15 0.25 DRILL N DPRB PROD1 brought pressure back up to +1- 4200 psi several times but could not dislodge the plug. Tried surging the coil to +/- 4200 psi several times and then bleeding off without successfully unplugging the coil. 21:15 - 00:00 2.75 DRILL N DPRB PROD1 Start out of hole with coil and BHA. 8/15/2001 00:00 - 00:05 0.08 DRILL N DPRB PROD1 Pre-job safety meeting prior to laying down BHA. 00:05 - 02:00 1.92 DRILL N DPRB PROD1 Lay-down BHA. Found the bit, motor, and orienter plugged with LCM material. 02:00 - 02:45 0.75 DRILL N DPRB PROD1 Circulate the LCM laden mud from the coil back to the pill pit. 02:45 - 02:50 0.08 DRILL N DPRB PROD1 Make up new BHA consisting of a nozzle, check assy., and coil connector. Prepare to run into hole. 02:50 - 06:00 3.17 DRILL N DPRB PROD1 RIH with nozzle assy. tagged at 9484' (uncorrected) unable to work past, could be top of whipstock. Pull up to 9400'. 06:00 - 07:00 1.00 DRILL N DPRB PROD1 Lay-in 33 bbl LCM pill 1:1 Pull up to 8400'. 07:00 - 08:15 1.25 DRILL N DPRB PROD1 Close choke squeeze away 30 bbl @ 1 bpm. Pressures 525 psi at start to max of 860 psi at 27 bbls away. Final 810 psi at 30 bbls away. Open choke circulate 15 min. rate: 2.2 in 11.8 out. 08: 15 - 11 :00 2.75 DRILL N DPRB PROD1 TOH. 11:00-11:15 0.25 DRILL N DPRB PROD1 PJSM discuss plu BHA and review drlg plans. 11:15-12:30 1.25 DRILL N DPRB PROD1 Change out MHA. (received new mud) P/U BHA #19 surface test orienter. Same time circ coil with new mud. 12:30 - 14:45 2.25 DRILL N DPRB PROD1 RIH to 450' shallow test MWD - ok. Continue RIH to 9265', 14:45 -15:15 0.50 DRILL N DPRB PROD1 Log tie-in after pumping 10 min BHA packed off. Tried to work plugged BHA with no luck. 15:15 -16:45 1.50 DRILL N DPRB PROD1 TOH. (Will plan to pig coil while on surface. Gunning pits and running over shakers while TOH. UD WE orienter and p/u Sperry) 16:45 - 18:15 1.50 DRILL N DPRB PROD1 Lay down BHA. Found LCM plugged in the orienter. 18:15 - 20:00 1.75 DRILL N DPRB PROD1 Hold PJSM. Circulate one coil volume of new Flo-Pro mud through coil, followed by a coil dart and one more coil volume of new mud. Very little LCM recovered from the coil. 20:00 - 21 :45 1.75 DRILL N DPRB PROD1 Assemble new BHA onto coil. Surface test orienter. 21 :45 - 22:30 0.75 DRILL N DPRB PROD1 RIH with coil and BHA. Circulate through BHA at minimum rate while running in hole. Performed shallow MWD test at 400'. Test ok. 22:30 - 23:10 0.67 DRILL N DPRB PROD1 Stop RIH in order to tear into mud pumps to investigate knocking noise (did not want to RIH while not circulating). Found an elasomer from the mud pumps valve seat out of place. 23:10 - 00:00 0.83 DRILL N DPRB PROD1 Continue to RIH with coil and BHA while circulating at mininimum rate. 8/16/2001 00:00 - 00:40 0.67 DRILL N DPRB PROD1 Wait on Nabors to repair mud pump motor #1. Motor will not start. Rig up Dowell pump and start circulating and resume running in hole with coil. 00:40 - 02:00 1.33 DRILL N DPRB PROD1 Continue to RIH with BHA and coil while circulating at 0.4 bpm at 860 psi. 02:00 - 03:00 1.00 DRILL N DPRB PROD1 Stop at 9275' MD with bit. Increase pump rate to 2 BPM and log down at 60 ft. per hour with the gamma ray to correlate depth. At an injection rate of 2 BPM the return rate was 1.2 BPM (0.8 BPM loss to the formation). Subtract off 10' from coil tubing measured depth to put on depth with the open hole log. 03:00 - 04:00 1.00 DRILL N DPRB PROD1 Orient tool face to 90 L. Had difficult time getting orientation Printed: 10/2/2001 9:49:38 AM (' ~:' BP EXPLORATION Page 10 of 11 Operations Summary Report Legal Well Name: S-17 Common Well Name: S-17B Spud Date: 8/6/1984 Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001 Contractor Name: NABORS Rig Release: 8/18/2001 Rig Name: NABORS 3S Rig Number: Date From - To Hours Activity Code NPT Phase Description of Operations 8/16/2001 03:00 - 04:00 1.00 DRILL N DPRB PROD1 due to hole taking fluid at rates of 0.8 to 1.0 BPM 04:00 - 04:30 0.50 DRILL N DPRB PROD1 Stacked weight on the bit when running in hole at 10,318'. Picked up bit to 10,310' and increased pump rate to 2.5 BPM in order to torque up on the BHA to orient it to 90 L (same orientatation as the toolface when the hole was drilled). Losses dropped to approximately 0.4 BPM. 04:30 - 04:35 0.08 DRILL N DPRB PROD1 Continue in hole. Free spin appears to be 3450 psi at 2.5 BPM. 04:35 - 05:00 0.42 DRILL P PROD1 On bottom at 10,396. Start drilling new hole at pump rate of 2.5 BPM at 3600 psi and a return rate of 1.4 - 1.8 BPM. Drilled to 10413'. returns down to 25% or less. 05:00 - 06:45 1.75 DRILL P PROD1 Orienting. Having hard time getting clicks. Circulate across topof hole and finally get the 1 click we are looking for. Returns from 25% to 0%. 06:45 - 08:00 1.25 DRILL P PROD1 Drill f/1 0413' to 10445'. No returns. Mixed through the hopper 3 sks MI seal II (ground peanut hulls) and 2 sks MI seal Med (cedar fiber & cello-flake) at 5min/sk. Plugged the BHA. 08:00 - 09:00 1.00 DRILL N DPRB PROD1 Pull uphole into casing trying to unplug BHA. Getting some movement at high pressures but just packing off worse. 09:00 - 12:30 3.50 DRILL N DPRB PROD1 TOH. Check BHA componets individually found small amount of LCM ( less than half the size of a golfball) on top of bleed sub. Thats it nothing else. Pumped through orienter and motor, no blockage. 12:30 - 12:45 0.25 DRILL N DPRB PROD1 LID tools. 12:45 - 13:00 0.25 DRILL P PROD1 Install TWC. (Called AOGCC for BOP test witnessing wavied by John Crisp) 13:00 - 18:00 5.00 DRILL P PROD1 Test BOPE. Circulate coil to pits. Circulate pits shake out any LCM. 18:00 - 20:15 2.25 DRILL P PROD1 Waiting on valve crew - stuck at bridge. Pump dart through coil. 20:15 - 20:30 0.25 DRILL N DPRB PROD1 PJSM to discuss circulating the hole full of mud and setting the Weatherford openhole whipstock. 20:30 - 21 :50 1.33 DRILL N DPRB PROD1 MU nozzle onto MHA and RIH to 4000'. Fill hole with flo-pro mud. Circulated mud into the hole and took returns for 10 minutes. Final pump rate was 2.5 BPM at 2,150 psi., returns recorded at 1.5 BPM. 21 :50 - 23:45 1.92 DRILL N DPRB PROD1 POOH with nozzle and MHA. LD. MHA. 23:45 - 00:00 0.25 DRILL N DPRB PROD1 MU BHA consisting of Weatherford ¡Alpha openhole whipstock (3.5" OD, 14.78' long). Alpha setting tool (1/2" ball set) and MHA. 8117/2001 00:00 - 02:15 2.25 DRILL N DPRB PROD1 RIH with Weatherford OH whipstock. RIH to 7748' CTD and stack out. Pick up and set down five times but could not work past. 02:15 - 04:15 2.00 DRILL N DFAL PROD1 POOH with Weatherford OH whipstock setting tool. The whipstock has prematurely set with the top at 7733.22'. Lay down Setting tool. Weatherford OH Whipstock: top aluminum billet 7733.2' md bottom of aluminum section 7743.5' md middle of slips 7744.9' md bottom. of anchor (packer) 7748' md 04:15 - 06:00 1.75 DRILL N DFAL PROD1 Discussed whipstock setting with town engineers. Plan forward is to RDMO. 06:00 - 08:00 2.00 DRILL N DFAL PROD1 P/U nozzle and RIH to 2500'. Lay-in 38 bbls crude 1: 1 to Printed: 10/2/2001 9:49:38 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date ( ( Page 11 of 11 BP EXPLORATION Operations Summary Report S-17 S-17B REENTER+COMPLETE NABORS NABORS 38 Start: 7/30/2001 Rig Release: 8/18/2001 Rig Number: Spud Date: 8/6/1984 End: 8/18/2001 From - To Hours Activity Code NPT Description of Operations 8/17/2001 06:00 - 08:00 08:00 - 08:30 08:30 - 00:00 00:00 - 06:00 8/18/2001 2.00 DRILL 0.50 DRILL 15.50 DRILL 6.00 DRILL N N N P Phase DFAL PROD1 DFAL PROD1 DFAL PROD1 PROD1 surface. Install BPV in tubing hanger. Begin rig-down operations. Rig Down Nabors 3S. Tested tree cap to 3,500 psi. Clean mud tanks. Dowell CTU #4 left location yesterday evening for Deadhorse to be respooled with new 2 3/8" coil (without e-line). Rig released at 0600 hrs 08-18-2001. Rig on Stand-by. Smaller loads moving out to DS #1 this AM. Larger heavier loads to move AFTER the OK is given by PD&C onsite engineer. Will cross the bridge on north lane. Recently poured cement needs to harden to 4000 psi comp strength. Weather dependant mainly temps will govern the cure times. Yesterday PM it was 3200 psi. Tentitive move start time is 1800 hrs. Printed: 10/2/2001 9:49:38 AM Well: Field: API: Permit: ----------- ( -{ 07/31/01 08/05/01 08/18/01 Nabors 3S ...--------...------------- 08/28/01 Move in and rig up. Pick up wash nozzle and fishing BHA. Run in hole, tag fish at 7743' ctmd. Circulate and wash top of fish with KCL water. Pull out of hole, pick up overshot and run in hole. Make several unsuccessful attempts to latch fish. Pull out of hole and found spear damaged. Make up same wash nozzle with six tattle tails. Run in hole, tag fish pumping. Shut down pump, pull out of hole. All pins showed engagement on fishing neck. Make up repaired overshot and run in hole. S-17B (Ops SID) Prudhoe Bay Unit 50-029-21148-02 201-145 Rig Accept: Rig Spud: Rig Release: 0 r i iii n g..£!!g : 08/29/01 Tag fish at 7736', jar up four times. Pull out of hole, remove fishing string. Whipstock is missing two rubber elements. Freeze protect. Rig down and move off. -------.-----..- ---.-------------...--------.-------.. POST RIG WORK .. { ~, -- Well: Field: API: Permit: S-17C Prudhoe Bay Unite 50-029-21148-03 202-007 Rig Accept: Rig Spud: Rig Release: Drill i n 9..!!!1f 02/14/02 02/16/02 03/02/02 Nabors 3S " PRE-RIG WORK 01/20/02 DRIFT TUBING WI 3.625 DUMMY WHIPSTOCK. 01/21/02 DRIFT TUBING WI 3.65" DUMMY WHIPSTOCK TO 9435' WLM. LEFT WELL SHUT IN. 01/27/02 MITIA PASSED TO 3000 PSI. 02/07/02 PRESSURE TEST SURFACE EQUIPMENT. PERFORM WEEKLY BOP TEST. MU AND RIH WITH PDS MEMORY GR/CCL. 02/08102 RIH WITH MEMORY LOG TO 9410' CTMD. FLAG PIPE. POH AND LOG TO 7850'. FLAG PIPE. POH. VERIFY DATA. GOOD. MU AND RIH WITH 2 7/8" MOTOR, JARS AND 3.80" MILL. RIH. CORRECT AT FLAG, TAG OPEN HOLE KICKOFF TOOL AT 9467' (DN), 9462' (UP). POH. PU 3" COMBO NOZZLE. RIH. COOL DOWN @ 9000' WHILE MIXING CEMENT. INJECTIVITY: 0.8 BPM AT 180 PSI. LAY IN 26.5 BBLS 17 PPG CEMENT FROM 9460' TO 9138'. LOST 14 BBLS TO OH WHILE LAYING IN. PULL TO SAFETY AND HESITATE SQUEEZE. UNABLE TO MAINTAIN WHP ABOVE 250 PSI. CEMENT TOP AT APPROXIMATELY 9350'. POH. DID NOT CIRCULATE OUT DUE TO LOW SQUEEZE PRESSURE. FREEZE PROTECT COIL AND PRODUCTION TUBING WITH MEOH. RDMO. NOTIFY PAD OPERATOR THAT WELL IS TO BE LEFT SI. 02/10/02 DRIFT W/3.25 CENT & SAMPLE BAILER. TAG CEMENT @ 9253' WLM (9284' CORRECTED). SAMPLE OF CEMENT. PRESSURE TUBING TO 1000# PSI TO TEST CEMENT. MONITOR FOR 30 MIN. GOOD TEST. RDMO. LEFT WELL SHUT IN. NOTIFIED PAD OPER. « 1"' STATE OF ALASKA f ALASK~, JIL AND GAS CONSERVATION COMtv..3SION APPLICATION FOR SUNDRY APPROVAL h-l{ It,- 0;:; I/° I-' /'"" 1. Type of Request: III Abandon 0 Suspend III Plugging 0 Time Extension 0 Perforate 0 Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance III Other 0 Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate Re-Enter Ops Shutdown 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of well: 181 Development 0 Exploratory 0 Stratigraphic 0 Service 6. Datum Elevation (DF or KB) KBE = 67.48' 7. Unit or Property Name Prudhoe Bay Unit 4. Location of well at surface 2204' SNL, 712' EWL, SEC. 35, T12N, R12E, UM At top of productive interval 2178' SNL, 1888' WEL, SEC. 34, T12N, R12E, UM At effective depth 1811' SNL, 2533' WEL, SEC. 34, T12N, R12E, UM At total depth 1811' SNL, 2533' WEL, SEC. 34, T12N, R12E, UM 12. Present well condition summary Total depth: measured 8. Well Number S-17B 9. Permit Number ~01-145 I 301-250 10. API Number 50-029-21148-02 \,/ 11. Field and Pool Prudhoe Bay Field I Prudhoe Bay Pool true vertical 10445 feet 8882 feet 10445 feet 8882 feet Plugs (measured) Set Open Hole Whipstock at 9475' (wI Cut 2-7/8" Liner below, S-17AL 1,9525' - 10196'), 08/01 true vertical Effective depth: measured Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD 110' 110' 2663' 2663' 8300' 7761' 8035' - 9450' 7530' - 8728' 110' 2634' 8274' 20" X 3011 13-3/811 9-51811 8 cu yds Concrete 4000 cu ft Arctic Set III & II 2214 cu ft Class 'G' 1405' 711 450 cu ft Class 'G' Perforation depth: measured NIA RECEIVED true vertical NIA JAN 0 9 2002 Tubing (size, grade, and measured depth) 4-1/211, 12.6#, NT13Cr80 to 8084' Alaska Oil & Gas Cons. Commission Anchorage Packers and SSSV (type and measured depth) 9-5/811 Otis 'HVT' packer at 8002'; 4-1/211 Cameo SSSV LN at 2111' 13. Attachments 181 Description Summary of Proposal 0 Detailed Operations Program 15. Status of well classifications as: 181 Oil 0 Gas 0 Suspended 0 BOP Sketch 14. Estimated date for commencing operation January 21, 2002 16. If proposal was verbally approved Service Name of approver Contact Engineer Name/Number: Ted Stagg, 564-4694 17. I hereby certify that the fore o' g i and correct to the best of my knowledge Signed Ted Stagg Title CT Drilling Engineer Date Approved Prepared By Name/Number: Terrie Hubble, 564-4628 Date 1- f -0 Z- Conditions of Approval: Notify Commission so representative may witness 1»5"CC:> "c;\ ~Y\~";.~ Plug integrity - BOP Test î Location clearance - Mechanical Integrity Test Subsequent form required 10- "'Ù '"\ lmginal Sìgned By A roved b order of the Commission Form 10-403 Rev. 06/15/88 Approval No. 3);) - 0 l Li Commissioner ( (" BPX S-17c Sidetrack Summary of Operations: Operations on S-17b were shut down on August 17, 2001 due to mechanical difficulties. This well will be re- entered and drilled to a new target located approx. 500 ft from the S-17b target. S-17b will become an abandoned open hole. Phase 1: Confirm integrity. Pump cement to isolate S-17b open hole. Planned for Jan. 21, 2002 . Pressure test tree, wing and master valves . Integrity test IA. . Drift well with dummy whipstock. . Use service coil to lay in and downsqueeze approx. 20 bbls 17 ppg cement to isolate the S-17b open hole and provide a kick off plug for S-17c. The window milled for S-17b will be salvaged and used for S-17c. Phase 2: Drill and Complete S-17c sidetrack: Planned for Feb. 1,2002 Drilling coil will be used to dress off cement just outside the existing window, kick off and drill 3 3,4" hole to the new S-17c BHL. The sidetrack will be completed with a fully cemented liner. Mud Program: . Phase 1: Seawater . Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg) Disposal: . No annular injection on this well. . All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. . All Class I wastes will go to Pad 3 for disposal. Casing Program: . 3 V2", 8.8#, L-80, ST-L x 3 3/16",6.2#, L-80, TCII x 27/8",6.2#, L-80, ST-L, solid liner will be cemented from TD to approx. 8045' MD (7562' ss). This liner will be cemented with approx. 24 bbls of 15.8ppg class G cement to place TOC approx. 300 ft above the window. Well Control: . BOP diagram is attached. . Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi. . The annular preventer will be tested to 400 psi and 2200 psi. Directional . See attached directional plan . Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging . An MWD Gamma Ray + Resistivity log will be run over the open hole section. Hazards H2S was measured at 30 ppm on May 20, 2001. Reservoir Pressure Res. press. is estimated to be 3300 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 2244 psi. ; ", ( TREE = 4-1116" CIW W8...LHEAD = M:EVOY A CTl.i4. T OR = BAKER KB. ELEV = 67.5' BF. ELEV = 38.83' KOP= 3100' Max Angle = 93 @ 9757' Datum MD = 9560' DatumTVD = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" 2662' Minimum ID = 3.75" @ 9450' OPENHOLE SDTRK WINDOW TOPOF BKR llEBACK SLV, ID = 7.5" 9-518" X 7" BAKER LINER HANGER, ID = 6.276" 8035' 8042' 4-1/2"TBG,12.6#, 13CR, 0.0152 bpf, ID =3.958" 8083' 19-518" CSG, 47#, L-BO, ID = 8.681" H 8300' PERFORATION SUMMt>. RY REF LOG: IVWVD 10/11/91 & RADUSLOG 07/26/95 ANGLEA TTOP ÆRF: 68 @ 9620' /88 @ 9916' I\bte: Refer to A"oduction DB for historical [erf data SIZE SPF INTER\! AL Opn/Sqz Dð. TE 5-17 A 3-3/8" 6 9620 - 9635 0 1 0f20/91 3-3/8" 6 9641 - 9647 0 1 0f20/91 3-3/8" 6 9650 - 9701 0 1 0f20/91 3-3/8" 6 9705 - 9709 0 1 0f20/91 3-3/8" 6 9711 - 9720 0 1 0f20/91 S-17AL 1 5DTRK 1-9/16" 4 9916 - 9936 0 08/07/95 1-9/16" 4 10030 - 10050 0 08/07/95 1-9/16" 4 10170- 10190 0 08/07/95 9981' 7" LNR 26#, NTBOS,13CR, 0.0383 bpf, ID = 6.276" 10060' 8-178 SAFETY I\IOTES: 4-1/2" a;RDrvE 1BG & 7" CI-ROMELNR W8...L > 70 DEG @ 9633' Af\D > 90 DEG @ 9727'. * AN A LA-IA OÆNH)LE WHIPSTOCK WA S PR8v1A TU RELY SET @ 7733' DJRlNG cm SIDETRACK OPS ON 08/17/01. 8 2111' 4-112" CAMCO SSSV NP, ID = 3.813" ST MD TVD DEV lYÆ VLV L TCH POR Dð.TE 5 3063 2993 9 OTIS DV RA 0 07/19101 4 5255 4974 29 OTIS DV RA 0 07/19101 3 7182 6688 24 OTIS DV RA 0 07/19/01 2 7895 7339 27 OTIS DV RA 0 07/1910 1 1 7961 7398 28 OTIS DV RA 0 7/19/2001 7990' 8002' -14-1/2" PARKER SWS NIP, ID = 3.813" I 9-518" X 4-112" OTIS HVT PKR, 3.880" 8051' 8072' 4-1/2" PARKER SWN NIP, MLLBJ TO 3.800" 4-1/2" PARKER SWS NIFPLE, ID = 3.813" 8084' 8078' 4-112" W/LEG HELMDTTLOGGBJ 10/19/91 I - 9-518" CSG MILLOUT WINDOW 8300' - 8380' (SECllON MLL ) NO1E: PR6-SIDETRAO< WELLBORE NOT SH)WN BELOW 9-518" CSG SEcrlON WINDOw. ..--.-----.--..-------- -....... -- --.--.-....-----.----------- 7" LNR MLLOUTWINDOW 9450' - 9456' (Whipstock @ 9445') 2-7/8" LNRSTUB FROM S-17AL1 I 10196' I OLD 2-7/8" LNRSHOE 3-3/4" OPEN HOLETD ( S-17B ) DATE REV BY COtv'MENTS Dð. TE REV BY COtv'Me-J1S 08/20/84 HF ORIGINAL COMPLETON 07/12/01 RN/tlh CORRECllONS 10/19/91 PAB CTD SDETRACK COI'vPL. 08102/0 1 JKBffP CI-EM CUT 07/29/95 JAM 2ND CTD SIDETRACK 08118/01 C/-VKAK A TIEI\tPT CTD SIDETRACK 03/15/01 S IS- \¡[) FINAL 08129/0 1 DDNiKK PLLL WHPSTOO< 07/07/01 RN/tlh CORRECTONS 09/24/01 WOJiKK WS DEPlH CORREcrlON PRUDHOE BA Y UNIT W8...L: S-17B ÆRMIT No: 201-145 APII\b: 50-029-21148-02 2204' SNL & 712' EWL, Sec. 35, T12N, T12E BP Exploration (Alaska) ,¡, ( S-17C ( PROPOSED CTD SIDETRACK TREE = 4" CrN WB...LHEAD= McEVOY ............""-""""""--"""-""""'" -........-........................- ACTUATOR= BAKER -. -----....-..----,- KB. B...EV = 67.5' ....-..-."'" -..-.... -....... -.................................. BF. B...EV = 38.83' ---_oo-,- ---.-. ....'------- --...,---- KOP = 2700 ....-......."- ..-.............. . .... ..-.... .......-........... ---....... ----- Max Angle = 93 @ 9757' -----.-----....---.- Datum MD = - 10104 .......--..-..---- -------...-...-..-...'-"'--'" Datum 1VD= 8800' SS '13-3/8" CSG, 72#, L-80, ID = 12.347" 1 TOPOF 7" 13CRLNR I 'TOp of Proposed 3-1/2" Liner I 80351 14-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958" 19-5/8" CSG, 47#, L-80, ID = 8.681" I 83001 11st Milled Window section I~ 83001 - 8380 1 '2nd Milled Window off Mech Whipstock I I 94451 I TOP OF WHIPSTOCK ÆRFORA TION SUMMA RY REF LOG: Radius Log 7/26/1995 ANGLE AT TOP PERF: 88 @ 9916' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-9/16" 4 9916 - 9936 0 08/05/95 1-9/16" 4 10030 - 10050 0 08/05/95 1-9/16" 4 10170 - 10190 0 08/05/95 PBTD I 17" LNR 26#, NT80S,13CR, 0.0383 bpf, 10 = 6.276" 1 8 21111 ST MD 5 3062 4 5254 3 7181 2 7895 1 7961 79891 80021 80021 80521 80711 80841 80781 -14-1/2" CAMCO SSSV NIP, 10 = 3.813" GAS LIFT MANDRB...S 1VD DEV TYPE VLV LATCH SIZE DATE 2993 9 OTIS RA 4974 29 OTIS RA 6688 24 OTIS RA 7339 27 OTIS RA 7398 28 OTIS RA -14-1/2" PARKERSWS NIPPLE, 10= 3.813" -1 OTIS RA TCH LATCH I -19-5/8" OTIS HVT PKR, ID = 3.880" I -14-1/2" X NIPPLE, ID = 3.813" I -14-1/2" XN NIPPLE, Milled out, 10 = 3.800" -14-1/2" W/LEG I 1-1B...MDLOGGED10/19/91 I 3 3/16" X 2 7/8" XO @ 9505 Proposed 2-7/8" L-80 Liner - Cemented & Perf'd -11130011 -,~.:t1',A:r}~. ,".. ...'.", .:\;1~::<;:.:\~'-;:' . "i~('...._.--- ":-0',.::'1;,.: :~) '. .~::~':;. ~ '.:-:';,- 3-3/4" OH -1 Open Hole Whipstock 1 12-7/8" LNR, 6.16#, ST-L, .00579 bpf, ID=2.441" 1-11019611 DATE REV BY COMMENTS DATE REV BY COMMENTS 08/20/84 HF ORIGINAL COMA..ErION 07/18/01 pcr S-17B Proposed Sidetrack 10/19/91 PAB em SIDETRACK COMA... 07/29/95 JAM 2ND em SIDETRACK 03/15/01 SIS-MD FINAL 07/07/01 RNItlh CORRECTIONS PRUDHOE BAY UNrr WB...L: S-17B Proposed PERMrr No: 95-048 API No: 50-029-21148-01 Sec. 35, T12N,T12E BP Exploration (Alask ) 12/06/01 ScblllDbepger NO. 1672 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage. AK 99503-5711 ATTN: Sherrie Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe BaY,Niakuk . Well Job# Log Description Date Blueline Sepia Color Prints CD '---=-- NK-07 A -~()I-()fo"'-6 21342 CDRlADN 04/22/01 1 NK-07 A 21342 MD VISION RESISTIVITY 04/22/01 1 1 NK-07 A 21342 TVD VISION RESISTIVITY 04/22/01 1 1 NK-G7 A 21342 MD VISION DEN/NEUTRON 04/22/01 1 1 NK-07 A 21342 TVD VISION DEN/NEUTRON 04/22/01 1 1 S-178 ~f\J-,L/ -~ 21483 SLlMPULSElGR 08/16/01 1 S-178 21483 SLlMPULSElGR 08/16/01 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc, Petrotectnical Data Center LR2- 1 900 E, Benson Blvd. Anchorage. Alaska 99508 RECEIVED Date Delivered: D,Ct" 0 7 r¡OO1 .L~ f L Alaska at & Gas Cons. Commi8sion AñaIorage Schlumberger GeoQuest 3940 Arctic Blvd. Suite 300 Anchorage. AK 99503-5711 ATTN: Sherrie Received ~ ~ tOY IS d- ~Dl/ \ S~ t,\) 1- J 4~ bp I" , Date: 10-01-2001 Transmittal Number:92263 '~ , BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. If you have any questions, please contact me in the PDC at 564-4091. Top 8W Name Date Contractor Loa Run Depth Bottom Depth Log Type DS01-04A 08-29-2001 ANADRILL 1 9100 10640 SURVEY REPORTIHARDCOPY (2EA) SURVEY REPORT/DISKETTE (lEA) 07-16A 09-10-2001 ANADRILL 1 10400 12368 SURVEY REPORTIHARDCOPY (2EA) SURVEY REPORT/DISKETTE (lEA) 8-17B 08-17 -2001 ANADRILL 1 9462 10445 SURVEY REPORTIHARDCOPY (2EA) SURVEY REPORT/DISKETTE (lEA) ~ ~ J...P :;) Please Sign and Return one copy of this transmittal. Thank You, James H. Johnson Petrotechnical Data Center Attn: Lisa Weepie (AOGCC) Attn: Sandy Lemke (Phillips Alaska) Attn: Susan Nisbet (Exxon Mobil Production) RECEIVED OCT 0 4 2001 Alaska Oil & Gas Cons. Commission Anchorage Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 ( 5-178 - 8/17/2001 ( OPERATIONS SHUTDOWN STATUS 2111' 4-112" CAMCO SSSV NIP, Ð = 3.813" 8 GAS LFT MANDR8..S ST M) lVD DEV lYÆ VLV LATŒi SIZE DATE 5 3062 2993 9 OTIs RA 4 5254 4974 29 ons RA 3 7181 6688 24 ons RA 2 7895 7339 27 ons RA 1 7961 7398 28 ons RA 7989' 4-1/2" PARKER SWS NIPPLE,ID = 3.813" 8002' ons RA TŒi LA TŒi 8002' 9-5/8" ons HVT A<R, D = 3.880" 'T"REE = W8.. L HEA D= - . ACTUA TOR= -.. ... --.. ,.- . KB. H.EV = -. "- ~- ..- BF. H.EV = . ---n-- ----. - KOP= ... ...-- - .. - ... Max Angle = ".'" - --- Datum MD = .. ..- - - - -- . - Datum lV D= 4" CfN McEVOY BAKER . --'-----'-- 67.5' 38.83' 2700 - . -.." ..----- . 93 @ 9757' ...- . ----- -----_.. - 10104 -..- - --- 8800' SS 13-3/8" CSG, 72#, L-80, Ð = 12.347" Alumnum Whipstock I Rug nadvertentty Set TOP OF 7" 13CR LNR 8035' 4-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, Ð = 3.958" 9-5/8" CSG, 47#, L-80, D = 8.681" 8300' 11 5t Milled Window section 1-1 8300' - 8380 I ¡2nd Mlled Window off Mach Whipstock H 9450' - 9456'1 9445' TOP OF WHPSTOCK PERFORA TION SUMMARY Ra= LOG: Radius Log 7/26/1995 ANGLE AT TOP PERF: 88 @ 9916' Note: Refer to A"oduction DB for historical perf data SIZE SPF MERVAL OpnlSqz DATE 1-9/16" 4 9916 - 9936 0 08/05/95 1-9/16" 4 10030 - 10050 0 08/05/95 1-9/16" 4 10170 - 10190 0 08/05/95 17" LNR 26#, NTBOS,13CR, 0.0383 bpf, Ð = 6.276" 1 8052' 8071' 4-1/2" X NIPPLE, Ð = 3.813" 4-1/2" XN NIPPLE, Milled out, D = 3.800" 8084' 8078' -14-1/2" W/LEG I H B.MD LOGGED 10/19/91 I 2-718" LNR, 6.16#, ST-L, .00579 bpf, Ð=2.441" Mill Window off Mach Whipstock in Open Hole Existing 2-7/8" Liner Cut & Pulled fl 3-3/4" OH OH Depth @ lime of Operation Shutdow n DATE REV BY COMMe-lTS DATE REV BY COMMENTS 08120/84 HF ORIGNAL COMPLETION 07/18/01 per S-17B A"oposed Sidetrack 10/19/91 PAB em SÐETRAa< COMPl. 08/20/01 per S-17B Ops SID 07129/95 JAM 2 NO em S ÐETRA a< 03115101 SIS-MD FNAL 07/07/01 RWtIh CORRECTIONS PRUDHOE BA Y UNIT WH.L: S-17B Op5 Shutdow n PERMIT No: 195-048 API No: 50-029-21148-01 Sec. 35,T12N, T12E BP exploration (Alaska) Well: Field: API: Permit: ( ( 07/31/01 08/05/01 08/18/01 Nabors 3S --.- ---- -- --- --- ---- ---.- - --..- - ----.- --... -------- -. ----.--- - --- --.------ -....----- - -----.-.--- --..-. --- - .- - ---.- ----- ----..---- ----- --------'--- - - -- -- --..... -- -_n- ....- . --- -- ----- - - S-17B (Ops SID) Prudhoe Bay Unit 50-029-21148-02 201-145 Rig Accept: Rig Spud: Rig Release: 0 ri iii n g..£!!g : 07/26/01 Load and kill well. Freeze protect to 3300'. Move in SWS. Logged GRICCL jewelry from 9566' to 7850' for tie-in. Cut 2-7/8" liner at 9525' with 2-1/8" chemical cutter. Good indication of shot. Completed static survey. PRE-RIG WORK 07/28/01 Successfully pressure tested tree and tubing. .., ( STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMIt>SION REPORT OF SUNDRY WELL OPERATIONS 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 1. Operations performed: IBI Operation Shutdown 0 Stimulate 0 Plugging 0 Perforate 0 Pull Tubing 0 Alter Casing 0 Repair Well 0 Other 5. Type of well: 181 Development 0 Exploratory 0 Stratigraphic 0 Service 6. Datum Elevation (OF or KB) KBE = 67.48' 7. Unit or Property Name Prudhoe Bay Unit 99519-6612 4. Location of well at surface 2204' SNL, 7121 EWL, SEC. 35, T12N, R12E, UM At top of productive interval 2178' SNL, 1888' WEL, SEC. 34, T12N, R12E, UM At effective depth 1811' SNL, 25331 WEL, SEC. 34, T12N, R12E, UM At total depth 1811' SNL, 25331 WEL, SEC. 34, T12N, R12E, UM 12. Present well condition summary Total depth: measured true vertical 8. Well Number S-17B 9. Permit Number I Approval No. 201-145 301-250 10. API Number 50- 029-21148-02 11. Field and Pool Prudhoe Bay Field I Prudhoe Bay Pool Effective depth: measured true vertical 10445 feet 8882 feet 10445 feet 8882 feet Plugs (measured) Set Open Hole Whipstock at 94751 (wi Cut 2-7/811 Liner below, S-17AL1, 9525' -101961),08/01 Fish: Rubber elements from whipstock left in hole, 08/01 Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD 8 cu yds Concrete 110' 1101 4000 cu ft Arctic Set III & II 2663' 2663' 2214 cu ft Class 'G' 83001 77611 450 cu ft Class 'GI 8035' - 9450' 7530' - 8728' 110' 26341 82741 20" X 30" 13-3/8" 9-5/8" 1405' 7" Perforation depth: measured N/A true vertical N/A Tubing (size, grade, and measured depth) 4-1/2", 12.6#, NT13Cr80 to 8084' Packers and SSSV (type and measured depth) 9-5/8" Otis 'HVr packer at 8002'; 4-1/2" Camco SSSV LNat 2111' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure OCT 0 2 2001 Alaska Oil & Gas Cons. Commission 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 181 Copies of Logs and Surveys run 181 Daily Report of Well Operations 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Si ned Terrie Hubble Title Technical Assistant 16. Status of well classifications as: 181 Oil 0 Gas 0 Suspended Service Date I 0 rO~.O Form 10-404 Rev. 06/15/88 Prepared By Name/Number: Terrie Hubble, 564-4628 Submit In Duplicate 1 , " , ( STATE OF ALASKA (- ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SU N DRY APPROVAL JM f-r 3/2~IÓI b f ;)1--\ Pv::r rP / /Zó 1. Type of Request: 0 Abandon 0 Suspend 0 Plugging 0 Time Extension 0 Perforate 0 Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance 0 Other 0 Change Approved Program II Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface v' if ~ 2204' SNL, 712' EWL, SEC. 35, T12N, R12E, UM At top of productive interval 2178' SNL, 1888' WEL, SEC. 34, T12N, R12E, UM At effective depth 5. Type of well: I8J Development 0 Exploratory 0 Stratigraphic 0 Service 6. Datum Elevation (DF or KB) KBE = 67.48' 7. Unit or Property Name . Prudhoe Bay Unit 2. Name of Operator BP Exploration (Alaska) Inc. At total depth 1568' SNL, 3363' WEL, SEC. 34, T12N, R12E, UM (As Planned) 12. Present well condition summary Total depth: measured 10445 feet Plugs (measured) true vertical 8814 feet Effective depth: measured 7748 feet true vertical 7274 feet 8. Well Number J S-17B 9. Permit Number 201-145 v 10. API Number 50- 029-21148-02 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool Set Open Hole Whipstock at 9475'; Inadvertently Set Open Hole Whipstock at 7748' (inside tubing) Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD 8 cu yds Concrete 110' 110' 4000 cu ft Arctic Set III & II 2663' 2663' 2214 cu ft Class 'G' 8300' 7761' 450 cu ft Class 'G' 8035' - 9450' 7530' - 8728' 110' 2634' 8274' 20" X 30" 13-3/8" 9-5/8" 1405' 7" Perforation depth: measured N/A RECEIVED true vertical N/A AUG 2 1 2001 Tubing (size, grade, and measured depth) 4-1/2", 12.6#, NT13Cr80 to 8084' Alaska Oil & Gas Cons- Commission Anchorage Packers and SSSV (type and measured depth) 9-5/8" Otis 'HVT' packer at 8002'; 4-1/2" Cameo SSSV LN at 2111' 13. Attachments I8J Description Summary of Proposal 0 Detailed Operations Program 15. Status of well classifications as: I8J Oil 0 Gas 0 Suspended 0 BOP Sketch 14. Estimated date for commencing operation ~~~,,=>~c'~ 17,2001 16. If proposal was verbally approved - Tom Maunder Name of approver Contact Engineer Name/Number: Ted Stagg, 564-4694 17. I hereby certify that the for: and correct to the best of my knowledge Signed Ted Stag' - Title CT Drilling Engineer 8/17/2001 Date Approved Service Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of Approval: Notify Commission so representative may witness Plug integrity - BOP Test - Location clearance - Mechanical Integrity Test .. ßJ.!þ§eQYElRtform required 1 0- lJ..{:)~ ö~ <:"~'t'I\Ð \~\:() "- --:orlglOai ~Igneo oy \ A roved b order of the Commission echsli Commissioner Form 10-403 Rev. 06/15/88 ORIGINAL bp ( f August 20, 2001 To: BP Exploration Alaska Inc. Drilling & Wells Coiled Tubing Drilling Team Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Tom Maunder Petroleum Engineer Subject: Well S-17b Operation Shut Down CTD sidetracking operations on S-17b were shut down on August 17, 2001. Open hole had been drilled to 10,445' MD when a decision was made to perform an open hole sidetrack. To facilitate the sidetracking operation an aluminum kick off plug was run with the intention of setting the plug in open hole at approximately 9780' MD. On the way in the hole the aluminum kick off plug became stuck in the 4 Y2" tubing at 7748' MD. When the setting tool was retrieved the shear stud was found to be sheared, indicating a full set of the aluminum plug. The well was freeze protected with crude to 2500 ft and a BPV set in the tubing hanger. Nabors 3S has now moved off the well. The tools needed for fishing this plug must be manufactured and tested before operations can resume. We currently expect to resume this operation within 30 days. Ted Stagg ~ CT Drilling Eng. 907 564-4694 Well File Petrotechnical Data Center Terrie Hubble ... ."f.tll, .....,~ ~.~ ~.- ~...'" *~~ .¡:~" .'I'.~I\. ". Re: PBU 5-178 (201-145) suspension of cm sidetrack \ Subject: Re: PBU 8-178 (201-145) suspension of CTD sidetrack Date: Fri, 17 Aug 2001 13:02:49 -0800 From: Tom Maunder <tom_maunder@admin.state.ak.us> To: "Johnson, Mark 0" <JohnsoMO@BP.com> CC: AOGCC North Slope Office <aogcc_prudhoe_bay@admin.state.ak.us>, Ted Stagg <staggto@bp.com>, Terrie Hubble <hubbletl@bp.com> ,c { Mark, Thanks for the information. Doesn't look like you have much of an operational choice. Yes, providing the sundry on Monday will be fine. Please include an estimate of when the CT drilling operations could resume. Tom Maunder "Johnson, Mark 0" wrote: > Tom, > > This a-mail is to inform you that CTD is suspending sidetrack activities on > well PBU $...178. An aluminum whipstock/plug has been inadvertently set in > the production tubing at - 7748'. The plan is for Nabors 38 to move off > S-178 and over to 01-04A (all permits approved) over this weekend. :> > $-178 has been freeze protected. KWF, BPV, and master valve secures the > well. > > We believe that the aluminum whipstock/plug can be retrieved once fishing > tools are constructed. Ted Stagg and Terrie Hubble will prepare the > "temporary halt of drilling operations" sundry you requested on Monday. > > Thx MOJ I~~-. ...- .----~ d- -- - Tom Maunder <tom maunder@admin.state.a~> . Petroleum Engineer Alaska Oil and Gas Conservation Commission 1 of 1 8/17/011:03 PM I/, ANADRILL SCRLUMBERGER Survey report Client...................: BP Exploration (Alaska) Inc. Field....................: Prudhoe Bay Unit Well.....................: S-17B API number...............: 50-029-21148-02 Engineer.................: M. Brown COUNTY:..................: Nabors 3S / Dowell # 4 STATE:...................: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum..........: Mean Sea Level Depth reference..........: Gr Tiein 9260 GL above permanent.......: -50000.00 ft KB above permanent.......: 67.50 ft DF above permanent.......: -50000.00 ft ----- Vertical section origin---------------- Latitude (+N/S-).........: 0.00 ft Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- Latitude (+N/S-).........: -999.25 ft Departure (+E/W-)........: -999.25 ft Azimuth from rotary table to target: 279.40 degrees [(c)2001 Anadrill IDEAL ID6_1C_10J 17-Aug-200101:56:45 Spud date................: Last survey date.........: Total accepted surveys...: MD of first survey.......: MD of last survey........: Page 1 of 2 17-Aug-01 29 9462.00 ft 10445.00 ft ( ----- Geomagnetic data ---------------------- Magnetic model...........: BGGM version 2000 Magnetic date............: OO-Y- 0 Magnetic field strength..: -999.25 Magnetic dec (+E/W-).....: -999.25 Magnetic dip.............: -999.25 ----- MWD Reference Reference Reference Tolerance Tolerance Tolerance survey Reference G.............. : R.............. : Dip............ : of G...........: of R...... . . . . . : of Dip.... . . . . . : RCNT degrees degrees Criteria --------- 1000.00 mGal 1000.00 RCNT 0.00 degrees 2.50 mGal 6.00 RCNT 0.45 degrees (+/-) (+/-) (+/-) ----- Corrections --------------------------- Magnetic dec (+E/W-).....: -57252.81 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: -57252.81 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N)........: No degree: 0.00 ( » ANADRILL SCHLUMBERGER Survey Report --- Seq # --- -------- -------- Measured depth (ft) -------- -------- 1 2 3 4 5 9462.00 9499.00 9532.00 9562.00 9598.00 ------ ------ Incl angle (deg) ------ ------ 39.20 46.80 53.00 57.00 59.20 60.40 63.10 66.50 72.40 77.90 81.50 83.40 84.50 85.80 86.40 86.70 88.70 91.90 94.80 95.20 96.70 97.80 96.60 94.10 91.10 91.70 91.90 90.53 90.53 ------- ------- Azimuth angle (deg) ------- ------- 334.20 333.00 330.00 326.00 319.60 315.10 309.20 305.50 303.70 302.00 304.50 308.50 313.50 318.00 318.60 313.50 302.80 306.30 312.30 317.20 312.30 309.50 308.10 306.00 306.70 292.90 289.30 281.11 281.11 ------ ------ Course length (ft) ------ ------ 0.00 37.00 33.00 30.00 36.00 33.00 30.00 32.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 45.00 32.00 52.00 31.00 64.00 19.00 28.00 26.00 24.00 58.00 21.00 37.00 75.00 [(c)2001 Anadrill IDEAL ID6_1C_10] 6 7 8 9 10 9631.00 9661.00 9693.00 9723.00 9753.00 11 12 13 14 15 9783.00 9813.00 9843.00 9873.00 9903.00 16 17 18 19 20 9933.00 9978.00 10010.00 10062.00 10093.00 21 22 23 24 25 10157.00 10176.00 10204.00 10230.00 10254.00 26 27 28 29 10312.00 10333.00 10370.00 10445.00 -------- -------- TVD depth (ft) -------- -------- 8670.25 8697.29 8718.54 8735.75 8754.79 8771.39 8785.60 8799.23 8809.75 8817.44 8822.80 8826.75 8829.91 8832.45 8834.49 8836.29 8838.11 8837.94 8834.90 8832.19 8825.56 8823.16 8819.65 8817.22 8816.14 8814.71 8814.05 8813.27 8812.57 17-Aug-200101:56:45 -------- -------- Vertical section (ft) -------- -------- 2463.64 2478.40 2493.92 2510.18 2532.38 2554.87 2577.09 2602.66 2628.07 2654.66 2681.65 2708.12 2733.52 2757.58 2780.88 2804.89 2844.26 2873.22 2918.19 2943.37 2995.27 3011.34 3035.54 3058.47 3079.84 3134.05 3154.60 3191.37 3266.34 ---------------- ---------------- Displ +N/S- (ft) Displ +E/W- (ft) ---------------- ---------------- -158.75 -136.17 -114.02 -93.20 -68.89 -47.93 -30.22 -12.67 3.27 18.99 35.17 52.86 72.42 93.83 116.18 137.73 165.46 183.60 216.46 238.19 283.00 295.33 312.74 328.33 342.54 -2523.45 -2534.68 -2546.74 -2559.77 -2578.25 -2597.57 -2617.16 -2640.18 -2663.30 -2687.65 -2712.33 -2736.22 -2758.73 -2779.58 -2799.49 -2820.27 -2855.58 -2881.93 -2922.08 -2944.00 -2989.19 -3003.44 -3025.08 -3045.74 -3065.05 371.29 -3115.24 378.85 -3134.82 388.54 -3170.49 402.99 -3244.08 Page --------------- --------------- Total displ (ft) At Azim (deg) --------------- --------------- 2528.44 2538.33 2549.29 2561.47 2579.17 2598.02 2617.34 2640.21 2663.30 2687.72 2712.55 2736.74 2759.68 2781.17 2801.90 2823.63 2860.37 2887.77 2930.08 2953.62 3002.56 3017.92 3041.21 3063.39 3084.13 3137.29 3157.63 3194.21 3269.01 266.40 266.92 267.44 267.91 268.47 268.94 269.34 269.73 270.07 270.40 270.74 271.11 271.50 271.93 272.38 272.80 273.32 273.65 274.24 274.63 275.41 275.62 275.90 276.15 276.38 276.80 276.89 276.99 277.08 2 of 2 ----- ----- DLS (deg/ 100f) ----- ----- 0.00 20.66 20.03 17.23 16.28 12.33 19.52 14.91 20.45 19.13 14.53 14.66 16.97 15.56 2.83 17.00 24.17 14.82 12.80 15.80 7.97 15.72 6.56 12.53 12.84 23.81 17.16 22.44 proj ----- ----- ------ ------ Srvy tool type Tool qual type ----- ----- ------ ------ TIP MWD MWD MWD MWD MWD MWD MWD MWD MWD ( MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD MWD ( MWD MWD SP MWD ., , (" S-178 - 8/17/2001 ( OPERATIONS SHUTDOWN STATUS TREE = 4" CWI/ WalHEAD= McEVOY -." - -- 00 -- --- ,,--.-..__n" ACTUA TOR= BAKER .. -' -"00 - - . ..--..--..---.... .-_.. KB. aEV = 67.5' "....-_00"""..' ---.---.--."."-" BF. B...EV = 38.83' . -- ...'--.." "--" -- --.. -. .. -.--_._.. . - -----------..-..- KOP = 2700 ----.. - _"00....____-- ---_--M_____- --"---" ..n.._--_,,- -~~. J\~..~le..::.. ...._~~~_..~?~!-' Datum MD = 10104 ... -- --..-.. .. --' _"_.._00_-- 00"-"__'-..- -.. '-"- DatumlVD= 8800' SS 2111' 8 113-3/8" CSG, 72#, L-80, ID = 12.347" I ST MD 5 3062 4 5254 3 7181 2 7895 1 7961 1 Aluminum Whipstock I Rug Inadvertently Set I 7989' 8002' 8002' TOPOF 7" 13CR LNR I 8084' 8078' 8035' 8052' 8071' 14-112" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958" 19-5/8" CSG, 47#, L-80, ID = 8.681" I 8300' 11 st Milled Window section 1-1 8300' - 8380 I -14-1/2" CAMCO SSSV NIP, ID = 3.813" I GAS LIFT MANORB...S lVD DEV TYPE VLV LATCH SIZE DATE 2993 9 OTIS RA 4974 29 OTIS RA 6688 24 OTIS RA 7339 27 OTIS RA 7398 28 OTIS RA -14-1/2" PARKER SWS NIPPLE, 10 = 3.813" -1 OTIS RA TCH LATCH I -19-5/8" OTIS HVT PKR, ID = 3.880" I -14-1/2" X NIPPLE, ID = 3.813" 1 -14-1/2" XN NIPPLE, Milled out, ID = 3.800" -14-1/2" W/LEG I 1-1 ELMD LOGGED 10/19/91 I 12-7/8" LNR, 6.16#, ST-L, .00579 bpf, ID=2.441" I ¡2nd Milled Window off Mach Whipstock 1-1 9450' - 9456" I 9445' I TOP OF WHIPSTOCK 3-3/4" OH ~\ \ ,-,~ 110~H Depth @ Ture of Operation Shutdow n I PERFORA TION SUMMA RY REF LOG: Radius Log 7/26/1995 ANGLEATTOPÆRF: 88 @ 9916' Note: Refer to Production DB for historical perf data SIZE SPF INTERV A L Opn/Sqz DATE 1-9/16" 4 9916 - 9936 0 08/05/95 1-9/16" 4 10030 - 10050 0 08/05/95 1-9/16" 4 10170 - 10190 0 08/05/95 IPBTDI 17" LNR 26#, NT80S, 13CR, 0.0383 bpf, ID = 6.276" 1 DATE REV BY COMMENTS DATE REV BY COMMENTS 08/20/84 HF ORIGINAL COMPLETION 07/18/01 pcr S-17B Proposed Sidetrack 10/19/91 PAB CTD SIDETRACK COMPL. 08/20101 pcr S-17B Ops SID 07/29/95 JAM 2ND CTD SIDETRACK 03/15/01 SIS-MD FINAL 07/07/01 RN/tlh CORRECTIONS PRUDHOE BAY UNIT WELL: S-17B Ops Shutdow n ÆRMIT No: 195-048 API No: 50-029-21148-01 Sec. 35, T12N, T12E BP Exploration (Alaska) ' ( {' $1T&\1TŒ LID~ !A\~&\$[{&\ AlAS &A. 0 IL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 w. 7TH AVENUE. SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Thomas McCarty CT Drilling Engineer BP Exploration (Alaska) Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Prudhoe Bay Unit S-17B BP Exploration (Alaska) Inc. Pennit No: 201-145 Sur Loc: 2204' SNL, 712' EWL, SEC. 35,TI2N, RI2E, UM Btmhole Loc. 1568' SNL, 3363' WEL, SEC. 34, TI2N, RI2E, UM Dear Mr. McCarty: Enclosed is the approved application for pennit to drill the above referenced well. The pennit to drill does not exempt you from obtaining additional pennits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required pennitting detenninations are made. Annular disposal has not been requested as part of the Pennit to Drill application for Prudhoe Bay Unit S-17B Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, ,., ~ /li, I~ZUA/- Julie M. Heusser Commissioner . BY ORDER OF TH~ COMMISSION DA TED this 2.-1!;? day of July, 2001 jj clEnclosures cc: Department ofFish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. ALAS~- STATE OF ALASKA I .JIL AND GAS CONSERVATION coJ,....SSION PERMIT TO DRILL 20 MC 25.005 Þ/l,\ 1 a. Type of work 0 Drill II Redrill 1 b. Type of well 0 Exploratory ~;atigraPhiC Test II Development Oil 0 Re-Entry 0 Deepen 0 Service 0 Development Gas ~ngle Zone 0 Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or Ker 1 O. Field and Pool BP Exploration (Alaska) Inc. KBE = 67.48' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028258 4. Location of well at surface 7. Unit or Property Name 11 . Type Bond (See 20 AAC 25.025) 2204' SNL, 712' EWL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number 2178' SNL, 1888' WEL, SEC. 34, T12N, R12E, UM S-17B Number 2S1 00302630-277 At total depth 9. Approximate spud date 1568' SNL, 3363' WEL, SEC. 34, T12N, R12E, UM 07/27/01 Amount $200,000.00 12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028257, 3363' MD No Close Approach 2560 11320' MD /8919' TVD 16. To be completed for deviated wells 0 17. Anticipated pressure {see 20 MC 25.035 (e) (2)} Kick Off Depth 9475' MD Maximum Hole Angle 99 Maximum surface 2244 psig, At total depth (TVD) 8800' / 3300 psig 18. Casing Program Specifications Setting Depth Ouantitv of Cement Size Too Bottom Hole Casino Weiaht Grade Couolina Lenath MD TVD MD TVD (include staae data) 3-3/4" 3-1/2" x 2-7/8" 9.3/6.16# L-80 ST-L 3275' 8045' 7472' 11320' 8919' 275 cu ft Class 'G' Dr: r' r= 1\ Ir=. r) I 'L-""""I Y -- 19. To be completed for Redrill, Re-entry, and Deepen Operations. JUL 1 8 2001 Present well condition summary Total depth: measured 1 0196 feet Plugs (measured) true vertical 8883 feet Alaska Oil & Gas Cons. Commission Effective depth: measured 10196 feet Junk (measured) Anchorage true vertical 8883 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110' Surface 2634' 13-3/8" 4000 cu ft Arctic Set III & II 2663' 2663' Intermediate 8274' 9-5/8" 2214 cu ft Class 'G' 8300' 7761' Production Liner 1405' 7" 450 cu ft Class 'G' 8035' - 9450' 7530' - 8728' Liner 2164' 2-7/8" Uncemented Solid Perforated Liner 8032' - 10196' 7528' - 8883' Perforation depth: measured 9916' - 9936', 10030' - 10050', 10170' - 10190' true vertical 8852' - 8853', 8859' - 8861', 8878' - 8882' 20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Thomas McCarty, 564-5697 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Dat. Signed Thomas McCartY / ¿ - ~ ~~ .. '... .' ,..!il,I~.. C~ Drilling Engineer . ,',,':,"';,'..:,.,'::,- ."-,',':::1,-'..- !.i._'..."'"..:!,i',., ,I .'-., ,¡".".,.".-:""¡:""":-",,¡.:~,,,..,.,.,,.,:-.,".":""""¡':"'::I'I:.iôim'mij:il¡~;a¡:,~- ,-",.", ",-'--:,.- '. .'.' . I. . - ,.1_.,- . Permit Number Js API Number ~pr?~~ ~ti I See cover letter 2£)/..- / 50- 029-21148-02 for other reQuirements Conditions of Approval: Samples Required DYes s: No Mud Log ~equi~d DYes ŒfNo Hydrogen Sulfide Measures ~Yes DNo Directional Survey Required SYes DNo Required Working Pressure for BOPE D2K D3K D4K D5K D10K 0 15K ~ 3.5K psi for CTU Other: Date 1 in /01 OR~GINAl SIGNEt) BY by order of Approved By n Do ] .. Commissioner the commission Form 10-401 Rev. 12-01-85 0 R \ b \ ',\~ j--",\ L Súbmit Vn T~iplicate ( (, 8PX 8-178 Sidetrack Summary of Operations: A CTD sidetrack of well S-17 Awill be drilled. Specific prep work, (Phase 1) and drilling, (Phase 2) operations are detailed below. Phase 1: Isolate & integrity test inner annulus (IA), drift. Planned for July 21, 2001 . Pressure test tree, wing and master valves . Integrity test IA after displacing to seawater & installing dummy gas lift valves. . Drift well with dummy whipstock. . The liner will be cut with E-line at approx. 9525 and then pulled. Phase 2: Drill and Complete CTD sidetrack: Planned for July 27,2001 The upper section of 2-7/8" liner will be pulled with the CTD rig. An open hole whipstock will be set above the cut liner and 2-3/8" coil will be used to kick off in the open hole at approx. 9475' and drill a .....1900 foot, 3-%" open hole sidetrack (as per attached plan). A solid, cemented & perforated 2-7/8"x 3-1/2" liner completion will be run. Mud Program: . Phase 1: Seawater . Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg) Disposal: " . No annular injection on this well. .1 . All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. . All Class I wastes will go to Pad 3 for disposal. Casing Program: . 3-1/2",9.3#, L-80 solid liner from 8045 (TOl) to 9535. 27/8",6.16#, L-80, solid liner be run from 9535' to TD. Liner will be cemented in place with approximately 49bbls (annular volume plus 25% excess in OH) of 15.8ppg class G cement. Well Control: . BOP diagram is attached. . Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi. . The annular preventer will be tested to 400 psi and 2200 psi. Directional . See attached directional plan . Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging . An MWD Gamma Ray + Resistivity log will be run over the open hole section. . A MCNL will be run in the cased hole. Hazards ~ H2S was measured at 30 ppm on May 20, 2001. Reservoir Pressure Res. press. is estimated to be 3300 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface is 2244 psi. TREE = WELLHEAD= , ACTUA TOR= KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum lVD= 4"CNV McEVOY BAKER 67.5' 38.83' 2700 93 @ 9757' 10104 .. . .. 8800' SS ~. S-178 ( PROPOSED CTD SIDETRACK 8 113-3/8" CSG, 72#, L-80, ID = 12.347" I 1 TOP OF 7" 13CR LNR 1 I Top of Proposed 3-1/2" Liner 1 8035' 14-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958" 19-5/8" CSG, 47#, L-80, ID = 8.681" 1 8300' 11 st Milled Window section l-l 8300' - 8380 1 12nd Milled Window off Mech Whipstock l-l 9450' - 9456'1 1 9445' 1 TOP OF WHIPSTOCK ÆRFORA TION SUMMA RY REF LOG: Radius Log 7/26/1995 ANGLEATTOPÆRF: 88 @ 9916' Note: Refer to Production DB for historical perf data SIZE SPF INTERV A L Opn/Sqz DATE 1-9/16" 4 9916 - 9936 0 08/05/95 1-9/16" 4 10030 - 10050 0 08/05/95 1-9/16" 4 10170 - 10190 0 08/05/95 IPBTD 1 17" LNR 26#, NT80S, 13CR, 0.0383 bpf, ID = 6.276" 1-l10060' r- 2111' ST MD 5 3062 4 5254 3 7181 2 7895 1 7961 7989' 8002' 8002' 8052' 8071' 8084' 8078' -l4-1/2" CAMCO SSSV NIP, ID = 3.813" I GAS LIFT MANDRELS lVD DEV TYÆ VLV LATCH SIZE DATE 2993 9 OTIS RA 4974 29 OTIS RA 6688 24 OTIS RA 7339 27 OTIS RA 7398 28 OTIS RA -l4-1/2" PARKER SWS NIPPLE, ID = 3.813" -l°TIS RA TCH LATCH I -l9-5/8" OTIS HVT PKR, ID = 3.880" 1 -l4-1/2" X NIPPLE, ID = 3.813" I -l4-1/2" XN NIPPLE, Milled out, ID = 3.800" -l4-1/2" WILEG 1 l-l ELMD LOGGED 10/19/91 I 12-718" LNR, 6.16#, ST-L, .00579 bpf, ID=2.441" 1 3-3/4" OH . .0" ",," :"~,..,""':. ~\....,.,,~: -,.., DATE REV BY COMMENTS DATE REV BY COMMENTS 08/20/84 HF ORIGINAL COMPLETION 07/18/01 pcr S-17B Proposed Sidetrack 10/19/91 PAB CTD SIDETRACK COMPL. 07/29/95 JAM 2ND CTD SIDETRACK 03/15/01 SIS-MD FINAL 07/07/01 RN/tlh CORRECTIONS PRUDHOE BA Y UNIT WELL: S-17B Proposed ÆRMrT No: 95-048 API No: 50-029-21148-01 Sec. 35, T12N, T12E BP Exploration (Alas ka) ( ( 38 CTD 80 P Detai I -- CT Injector Head --- Stuffing Box (Pack-Off), 10,000 psi Working Pressure ~ - 7" Riser Methanol Injection 8tis 7" WLA Quick onnect - 7-1/16" 10,5000 psi working pressure Ram Type Dual Gate BOPE ~ Manual over Hydraulic ~ Flanged Fire Resistant Kelly Hose to Dual Choke Manifold 7-1/16" 10, 5000 psi working pressure Ram Type Dual Gate BOPF:::::::l ~ Manual over Hydraulic MOJ 5/21/01 Annular BOP (Hydril),7-1/16" 10 5000 psi working pressure Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on OS Hardline to Standpipe manifold I 2 7/811 Combi Pipe/Slip I 2 3/811 Combi Pipe/Slip XO Spool as necessary Single Manual Master Valve (optional depending on RU) 2" Side outlets @ 2 flanged gate valves 7" Annulus o~ 9 5/8" Annulus I I ~ COMPASS for Windows - CFW 1996.1 Single User (Read Write) 1!!Ir;] Ei fie SectIon Edit VIew Plðmint;¡ :";1 V<=)' Anticollision utatios WIndow ~ J ~ ~ I *' ¡ Ii Hi All .I: I II-. ~~ iiI @) '- fi) I Ell ~'t¿ . I:] I S§ i8 I ~, " I rt1 . 1m ,'.5t<1t~'",.,.,"",'""',".,, ,','",'",',..'.",',"."'.,',,',,',,'.,,..."::',':.',>"~~',".".,'i",,. " ".'."'"',,,'.."(;1£1 ,---"- - - -- -- ----------- - - --_._--------,-- .-- -- - - --.." --. ---..- ,..,.---,,---....,..,---.........---'------"'---- ',,",:.'i,.,..:""......"..£! + 11811 ICl Co I Leo I "- ¡ ole! I ~ 'è ~ ! ~ I i ~_~¡:PlânEdjtQr:':'PJan#B.:..oao',,' ,."",.,.""".":"i..i,',"'.,'..".,:,,,,:.,.,,:>:.,i:,:::::,:'::";i-\",:"'i':'i':::,',',.,',':.".'.""",',','.""',',', '",'""','".".,':..",:,'.,'....""..',,,,,.',::',::' . ,,'.,",.':I!I~EJ -'."'"-"""""....,,, """"'...""""""""""'" ""-""""'-."'. ,-""""""""",--,,--,-,,""-,"'--"---""'--"""'---""""-""""'----.'-..-"..,.,.>,.. -........'. -,""',',- ""----""",,---,...--,..,,.........--. MD Inc Azi TVD NS EW V.See Dogleg T.Face Build TUln . Cl ' (ft) de (deg) (It) (II) (II) (II) (deg/1 DOH) (dee) (degl1 DOtI) (degl1 rom' . . (It) . Section T)IPe Target 1 ',945000 ,39.12: 1335:35.":,8729.43','.L-165.61'A:.-2520.24',O,OO:--:;::io.oo.', -¡D.OO:.'",O.OO,'::.\',o.OO;":':."'i-9450.00;:'iTí,," ';-':';".:"'.~"'¡-":':;4J:...:,,::J>\';i../¡,,';!i,,; , """""'._,,-'" -..-.. _..~"..,- -,...~.. --, .. """;,:,¡"",-"""""-."""",,,,,'.I..,-,..t-- 'N' A....,- ,--_..~,.. -.. ,.,,'.."'. ......_""...,.., - -" ""-'---~"-'.".""""'.""'I.".""'Ir'O:~,,"i'.""'- -'-"¥'r' 2 9460_00 . ~..1.!.2- .:J33,;;3..5,'.:'...J~~.P9.',;..l-~..5~V§~':>T~R:J§'J5.'~,::":"~j20,00 . O,O02,O,.Qq ,',:. ,1'0:,99!~¡~~;:;':11"0 90.._,.. .,~rU~1...D_:;:J2f.~t.~:~;.L':;,~~~~::,)2i,::"U:..¿'~~ 3 ,~7~_~ , -: noo :'?81.~,~.;,...l~.Q4.,..P... .:1:~~~:"~, :~ =~~.:.1~xJ~,1~.,~..,~:_.¡ 18,00 29000 J.1:.?8. .,~::.,:-]~~o.~.:.f,~.::~~1.~~~~,:;,\¡QI~.!!:1~~:' ::,.'":~!i-:I';:.i.;.;,, ~Jl;..:,::..;,t:'~¡;i~..;nw.;. ':~':.:;t,,~ 4 .~~,~" ; 90 00 .~~:~ "..;--¡~,9J~~~._..,¡1,?:~..:~.",;~~ ,Ç.~~:~h~.Q1.~',:,.:.~ 1S 00 .50 00 ).1..-~ "'"" V~~~!-,:::,.,..¡J~.-?~.,-.;dP!,~J9C..::,:;";.,,:::'::,:,i:~~';,,.. ,~",..~~~~~~L"~;;::';:';;':"h;_:,j 5 ~~,17,.. i 9900 ,. .2?9..?t - l~I~P~:~ _,l~M~,.~...'..~,:~§},_.,,~~j~..:,.:.:.t 18,00 , 298,00 .8.~..... .i.:1§.I!4'~"":":H.~.Ji"':,i:LR1~.I.I'!;,,_...~.:::.1.~','.~'::..~, "",-::,:,;:~:;'¿::~.::.:;':;, ;~L.'I 6 1019817 r94.~-,.,~31.6.~. .:. ~~~"'~- p,~8:!8..,,- ¡:~,1~,~~~J52.!~~1....._t18,OO94'OO ,:2._D? .J'.1~0?":"I..~t205,OO", .,.DJ.],.M.Q,.\:.¡:.,'~~:~.f~.:~~,~:........;.¡;,!:'.~:'~:,::"~I':':'-"I:';"'~';j: 78 ~90.r4"5-:?2' __1990.0 0000" ;,292"'7' 42..:.!222'~ '::';'~'i.ea88-h !77"7' ~.'~' "'.¡~2"3,98' .,},,~O' ~~:---+~~~.321,,-,"~',J.~O..~..012' _7' ~..",... 1188 0000 '225780,0000 >0},'O90} .",,"" " i ~'1FB,~.5900-_<"';'~,~'1]2.2-5-,'~0-0 ¿].DD-,TT"'~1"-MI,!:1.~D'~.~/"~~.,:.:~':~.':',':"~.'~.:: ..,~' ;:'~::~~,~.:~';':~:'i':.':~.-';::~~,'~~:'.'¡, , ""_,_.", """""""¡--"."'!......~,.._,,,,.._~~...:,l,I~......'.... -~....._L....._...._..1 .,..,.._...."....._..~..._"-."..,.¡-..."-....,.,."..'_,...._"....~,,,, 9 1064542 '87.65 1308.15' ,'!8B81.75 , ¡305.93'. ';'-3519.72..849.76 !18,OO 94,00 .1.17 :17.97,1200,00 D11 MD, ':',',:, ,.';, 0:,';' ., c,," ".: 10 1074542 :i5:ö9',"""'¡321.ZZ'" ""¡äè96.-79'-'ij75.Qi;":"t~3ša9:à5""f942.'O2" ";¡1S,OO 135.00 '.1f56"":ïÙiri-"""."!1O0.00 "DtiMD',"":~::':.,>:l¡""'~:::r:""':','-,"'1 11 1099542 'B6j7,~,,:..'t'27K9i"':.t'B939.öi..t490.3,,:,.t3äOö:¿f.:nï35:43 "":r18 00 28000' '4,5{""'.:"'¡':i7Jlf,..":t250,OO :bTrMi5",:,:"'",:,:~,:,,,,"':'.'r":::\:"+~.':"<:-:~',',",:';;:.":,1 12 11J4~.17 ,19'0 ÕO"', - ')öf~(~,~~,r~.4(~,-:~1~4i$~(J:~1]~,:~fi2~3:~::':'~¡ 18.00 :83.00 '~3~ '~:.:~,:':¡ij.~~C;S':~!-lsg.,!!L,~~,Ü)~~;':~:~?~::::~7:~. J:~;.:"Ò;.:,':::':r~':' :'T:i q .' 1132002 .~,g:~........ :~O~:~4--_1.~~~.!f?_,..._.I.~~P,~~ ~ ..:~~~~!?ll..~Ll3:8.~~_e~,_.J17,OO 180.00 .-H~9Q,: ,,'....l.q,9P~...~.:J171.85 ;~nMR...:~:~:i:~::(:.:¡ '~.',,:',::'~,~~,:~":',.~,'_..~~,._..1 .. . . . , , .. - t:] 'x æt ~rr@ ~ Rb f\olnm ~~ . Q.S Ni g~ I ~f- ~~ I!Ì!J i ~ 6.11 ~. ,..'(.. » }@f¡@ IZ(] La I¡; !I! fi' ~~ % I1i 8ft ! ;\f ~~ I [èJ I (t1. (~{ I~ ,.K I 8! ) Plan: Plan #3_O80 (S-17ALl/S-17B Plan 8) Plan: Plan #8_O80 (S-17ALl/S-17B Plan 8) .._,~e__ct_i_o,n Y_i_ew___- .. -------_. - '---' - ----- -- ---- -- ,- ---- ,,_I!!I.. ,[!J-,- 13.,- Ii Õ ~ ... ::> ~ I I ¡I. i -~ - \ - --1---+- --l--- .. :-,-_.t- ~ 'd---~--~ ~-~- ,¡, '"~ . -'T~+;..,¡:' '~"¡I;~+..t-: i I I I : ¡ ,.1. j... -I . .;,. . ¡ .. . . ¡ , I : i i ' .. ¡, '.:'." i : ~~ ,--)ollie .200 2QO +00 000 1000 100 VclUCù Section 4 335,00- 111.1 ~.",ß.} ~," '- ,':_'.f ",; ¿',."","',":.'..::_i.~ -.Ii,' \,~;...:'-:_;t ~.../:~_:;-','-~ ~-,1'_\:.:'-p,.'t_¿\: ',i:_'i§,','S;: :;;'}:.',£I...: ;:: ~T!;: \_i;/:,,_:, ii;;.: \;;t_;,.~.i ;~;/.!-i i,:i' [2 ;j{*~:';.;',i;_~_' S~-¿~);.¡,:_¡_\{: 1~i'_" :,:.!'):';S_: i.:.},; :t.,': I t ¡ - ~ _..~- ., I I , + I li- ~¡' " 7BtJ8 ..., - , I . .. - "'" ...' I I I -~ I -,,- ~--,- ...-- ,-------..."-- _,_1___,__" -....J : I I ' I I . I I I . . I ,1--...--,~, -,..j-------..+--,.. --- ! . I ' ! I I I ¡ ! . I I 7B1I '+fO .) 0 -)r I I . ., 1. .. I . . I I I . .. . '. .. : , ¡ I I , -2'f° . ~ ¡ ... . I \ .. ---. 'I ' ..., I I I I ¡ I .. - ~ . . -"'~ .. lhO 1000 1100 1800 West(-)/East(-» [ß] ... Ready /Uiîit" System: ÃPJ Bãšed -- [Ai)õ1;"Sidëg -- tDëiPthS:1t'-- fMãp: f~ ~5tðrtllj ~ ø ~ ¡ ]_~Inb...I~ (jJ20...II~co-- .CF... J~ ,1~1- ..,I1~l~:~J.:t"Jca...1 IjDesktop» rïiifIj. ~lg~.J~SÑ A:" 't:38PM tA ( , -- ~ ~ --- .1) ~ -...t:. ~, BP Amoco ( Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB S Pad Well: S-HAL 1 Wellpath: S-17B Plan 9 Section 2: Start DLS 18.00 TFO 290.00 Date: 7/18/2001 Time: 10:41 :35 Page: Co-ordinate(NE) Reference: Well: S-17 AL 1, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: User (-165.61 N,-2520.23E,335.00Azi) Plan: Plan #9 2 MD Inel Azim TVD +N/-S +FJ-W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/1 OOft deg/1 OOft deg/100ft deg 9475.00 42.11 331.56 8679.81 -150.84 -2527.38 16.40 18.00 6.58 -25.24 - 70.00 9500.00 44.01 325.59 8698.09 -136.30 -2536.28 33.35 18.00 7.62 -23.90 -67.17 9525.00 46.21 320.04 8715.73 -122.21 -2546.99 50.64 18.00 8.78 -22.19 -62.80 9550.00 48.65 314.91 8732.65 -108.67 -2559.43 68.18 18.00 9.77 -20.53 -58.88 9575.00 51.30 310.16 8748.73 -95.74 -2573.54 85.85 18.00 10.62 -18.99 -55.41 9600.00 54.14 305.77 8763.88 -83.52 -2589.23 103.56 18.00 11.33 -17.59 -52.35 9625.00 57.12 301.68 8778.00 -72.08 -2606.39 121.18 18.00 11.92 -16.34 -49.69 9650.00 60.22 297.87 8791.00 -61.49 -2624.92 138.61 18.00 12.42 -15.26 -47.38 9675.00 63.43 294.29 8802.80 -51.82 -2644.71 155.74 18.00 12.83 -14.32 -45.40 9700.00 66.72 290.90 8813.34 -43.12 -2665.64 172.47 18.00 13.17 -13.53 -43.71 9704.25 67.29 290.34 8815.00 -41.74 -2669.30 175.26 18.00 13.34 -13.13 -42.28 9725.00 70.08 287.68 8822.54 -35.45 -2687.58 188.69 18.00 13.47 -12.82 -42.06 9750.00 73.50 284.60 8830.36 -28.86 -2710.38 204.30 18.00 13.67 -12.33 -41.09 9775.28 77.00 281 .59 8836.79 -23.32 -2734.19 219.38 18.00 13.84 -11 .90 -40.13 Section 3: Start DLS 18.00 TFO 50.00 MD loCI Azim TVD +N/-S +EI';W VS. DLS,' Build ,Turn, TFO " ft" deg deg ft ft ft ft ,'deg/tOOft' deg/1 OQft deg/100ft deg 9800.00 79.88 285.05 8841.75 -17.74 -2757.75 234.40 18.00 11.66 14.00 50.00 9825.00 82.83 288.49 8845.50 -10.61 -2781.41 250.86 18.00 11.80 13.75 49.31 9850.00 85.81 291.88 8847.98 -2.02 -2804.75 268.50 18.00 11.90 13.57 48.79 9875.00 88.80 295.25 8849.15 7.96 -2827.63 287.22 18.00 11.96 13.47 48.45 9885.03 90.00 296.60 8849.26 12.35 -2836.66 295.01 18.00 11.98 13.44 48.29 Section 4: Start DLS 18.00 TFO 298.00 IRcl, Azim TVD +N/-S, ofF/.W VS, DLS , Buiid. ,Turn' ,TFO deg.'., "deg. ft "ft' "ft "ft.' degl1 dOftde~11 OOft deg/100ft. d,' .,. e,9.. 9900.00 91.26 294.22 8849.09 18.77 -2850.17 306.54 18.00 8.45 -15.90 -62.00 9925.00 93.37 290.24 8848.08 28.22 -2873.29 324.88 18.00 8.42 -15.92 -62.03 9950.00 95.46 286.24 8846.16 36.02 -2896.95 341.95 18.00 8.36 -15.99 -62.19 9975.00 97.52 282.22 8843.33 42.13 -2921.02 357.66 18.00 8.25 -16.10 -62.50 9993.17 99.00 279.27 8840.72 45.48 -2938.69 368.16 18.00 8.13 -16.23 -62.95 Section 5: Start DLS 18.00 TFO 94.00 1\1:1> .Iód, Azhn. . .TVD ," . +N~-S. ,"+FJ-}Y' VS " DLS. 'Build, "Turri <, ,r£F(J" .' .ft cteg ,," deg' 'ft. ~ ,',' ft ft ft . deg!100ft. dåg/100ft, des/100ft" de ., "..g 1 0000.00 98.91 280.51 8839.66 46.64 -2945.33 372.02 18.00 -1.29 18.18 94.00 10025.00 98.56 285.05 8835.86 52.10 -2969.43 387.15 18.00 -1.42 18.15 94.19 1 0050.00 98.15 289.58 8832.22 59.46 -2993.03 403.80 18.00 -1.64 18.12 94.88 10075.00 97.69 294.1 0 8828.78 68.67 -3016.01 421.86 18.00 -1.84 18.08 95.54 10100.00 97.18 298.61 8825.54 79.68 -3038.22 441 .22 18.00 -2.02 18.04 96.16 10125.00 96.63 303.11 8822.54 92.40 -3059.52 461.75 18.00 -2.20 18.00 96.75 10150.00 96.04 307.60 8819.77 106.78 -3079.78 483.34 18.00 -2.36 17.95 97.29 10175.00 95.41 312.07 8817.28 122.71 -3098.87 505.85 18.00 -2.51 17.91 97.78 10198.17 94.80 316.22 8815.21 138.78 -3115.43 527.41 18.00 -2.64 17.88 98.23 Section 6: Start DLS 18.00 TFO 258.00 l\fD. 111ël " AziBi "TV}) +N/~S +Fl~W YS "I>t.S ,Build' Turn '.. l'FO ft" 'd~g deg ft ft <ft ft deg/1 OÖft.. deg/1 OOft deg/1pOft de~ .. , 10200.00 94.73 315.89 8815.06 140.09 -3116.70 529.14 18.00 -3.75 -17.67 -102.00 10225.00 93.78 311.48 8813.20 157.31 -3134.72 552.35 18.00 -3.80 -17.64 -102.03 10250.00 92.81 307.08 8811.77 173.1 0 -3154.03 574.83 18.00 -3.89 -17.60 -102.35 10275.00 91.82 302.69 8810.76 187.39 -3174.52 596.44 18.00 -3.96 -17.57 -102.61 10300.00 90.82 298.30 8810.18 200.06 -3196.05 617.03 18.00 -4.00 -17.55 -102.79 10320.42 90.00 294.72 8810.03 209.18 -3214.32 633.01 18.00 -4.02 -17.55 -102.89 ( BP Amoco ( Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: P8 S Pad Well: S-17AL 1 Wellpath: S-178 Plan 9 Section 7: Start DLS 18.00 TFO 270.00 Date: 7/18/2001 Time: 10:41 :35 Page: Co-ordinate(NE) Reference: Well: S-17 AL 1, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: User (-165.61 N,-2520.23E,335.00Azi) Plan: Plan #9 3 MD Inel Azim TVD +N/-S +F1- W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg 10325.00 90.00 293.89 8810.03 211.06 -3218.49 636.48 18.00 0.00 -18.00 -90.00 10350.00 90.00 289.39 8810.03 220.28 -3241.73 654.65 18.00 0.00 -18.00 -90.00 10375.00 90.00 284.89 8810.03 227.65 -3265.61 671.42 18.00 0.00 -18.00 -90.00 10400.00 90.00 280.39 8810.03 233.12 -3290.00 686.69 18.00 0.00 -18.00 -90.00 10425.00 90.00 275.89 8810.03 236.65 -3314.74 700.35 18.00 0.00 -18.00 -90.00 10445.42 90.00 272.22 8810.03 238.10 -3335.11 710.27 18.00 0.00 -18.00 -90.00 Section 8 : Start DLS 18.00 TFO 94.00 TYD ft 8810.04 8810.13 8810.36 8810.72 8811.22 8811.85 8812.60 8813.47 8814.27 DUS Build TUrD deg/100ftdeg/100ft,de,g/100ft 18.00 -1.26 17.96 18.00 -1.25 17.96 18.00 -1.24 17.96 18.00 -1.23 17.96 18.00 -1.20 17.96 18.00 -1.17 17.97 18.00 -1.13 17.97 18.00 -1.09 17.98 18.00 -1.04 17.98 10450.00 10475.00 10500.00 10525.00 10550.00 10575.00 10600.00 10625.00 10645.42 Section 'MD ,ft 9 : Start DLS 18.00 TFO 135.00 lricl Azim TVD ','deg", deg', "..,ft'"" 87.07 308.73 8814.48 83.89 311.93 8816.45 80.74 315.17 8819.80 77.61 318.47 8824.49 75.09 321.22 8829.31 10650.00 10675.00 10700.00 10725.00 10745.42 Section 10: Start DLS 18.00 TFO 280.00 ~I) "'~~~....~:~TriD.. 1 0750.00 75.23 320.38 8830.49 10775.00 76.08 315.82 8836.68 10800.00 77.00 311.29 8842.51 10825.00 78.01 306.79 8847.92 10835.20 78.44 304.97 8850.00 10850.00 79.08 302.34 8852.89 10875.00 80.22 297.91 8857.38 10900.00 81.42 293.52 8861.37 10925.00 82.66 289.15 8864.83 10950.00 83.95 284.81 8867.75 10975.00 85.27 280.49 8870.10 10995.42 86.37 276.97 8871.59 Section 11 : Start DLS 18.00 TFO 83.00 MI) " Il1cl ' A;ibll.. .' TYJ) , ft ' ..deg , deg ft " 11000.00 86.47 277.79 8871.87 11025.00 87.03 282.26 8873.29 11050.00 87.61 286.73 8874.46 11075.00 88.21 291.19 8875.37 11100.00 88.82 295.65 8876.02 11125.00 89.43 300.11 8876.40 11148.17 90.00 304.24 8876.52 238.31 240.61 244.85 251.01 259.04 268.90 280.53 293.85 305.93 +N/-S ft 308.77 324.90 341.96 359.86 375.02 " +N/~S o~ft 378.45 396.47 413.22 428.59 434.44 442.48 454.82 465.52 474.53 481.77 487.22 490.31 " +N/~S , .' ft' 490.90 495.24 501.49 509.61 519.54 531.23 543.56 +F1-W ft -3339.68 -3364.57 -3389.20 -3413.42 -3437.08 -3460.04 -3482.15 -3503.28 -3519.72 +EI~W ," oft ", -3523.30 -3542.30 -3560.25 -3577.05 -3589.85 '+FI~W " ft -3592.64 -3608.82 -3626.43 -3645.39 -3653.48 -3665.56 -3686.83 -3709.06 -3732.11 -3755.85 -3780.13 -3800.26 +FI-W ft -3804.79 -3829.37 -3853.54 -3877.16 -3900.08 -3922.17 -3941.78 712.39 724.99 739.24 755.06 772.34 790.98 810.86 831.86 849.76 .YS ,ft " 853.85 876.50 899.55 922.87 942.02 'YS "At 946.31 969.48 992.1 0 1014.04 1022.76 1035.16 1055.33 1074.42 1092.32 1108.93 1124.12 1135.43 1137.88 1152.20 1168.08 1185.42 1204.11 1224.04 1243.50 , 'DLS "Build Turn"" ,deg/100ft deg/1 OOftdeg/100ft . 18.00 -12.73 12.74 18.00 -12.70 12.80 18.00 -12.62 12.95 18.00 -12.50 13.19 18.00 -12.36 13.47 " ,DLg ,Build Turn, " deg/1 qOft degJ1 OOft deg/100ft, 18.00 3.16 -18.33 18.00 3.37 -18.25 18.00 3.71 -18.11 18.00 4.02 -17.97 18.00 4.22 -17.87 18.00 4.36 -17.81 18.00 4.56 -17.70 18.00 4.78 -17.58 18.00 4.98 -17.47 18.00 5.15 -17.37 18.00 5.29 -17.28 18.00 5.39 -17.22 , DLS..," Build: " ,Turn, '. " ,deg/tO°ft deg/1 OOftdeg/1 OOft 18.00 2.20 17.90 18.00 2.25 17.89 18.00 2.32 17.87 18.00 2.38 17.85 18.00 2.42 17.84 18.00 2.45 17.83 18.00 2.47 17.83 TFO deg 94.00 94.00 93.98 93.94 93.88 93.79 93.67 93.54 93.38 TFO deg 135.00 134.97 134.72 134.29 133.67 "TFO .'deg' -80.00 -79.79 -78.65 -77.60 -76.63 - 76.25 -75.74 -74.95 -74.24 -73.64 - 73.13 -72.73 " 'rF() d '"" eg 83.00 82.95 82.70 82.49 82.32 82.21 82.14 ( BP Amoco ( Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB S Pad Well: S-17AL 1 Wellpath: S-17B Plan 9 Section 12: Start DLS 17.00 TFO 180.00 Date: 7/18/2001 Time: 10:41 :35 Page: Co-ordinate(NE) Reference: Well: S-17 AU, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: User (-165.61N.-2520.23E,335.00Azi) Plan: Plan #9 4 MD Incl Azim TVD +N/-S +FJ-W VS DLS Build Turn TFO ft deg deg ft ft ft ft deg/100ft deg/1 OOft deg/100ft deg 11150.00 89.69 304.24 8876.52 544.59 -3943.29 1245.08 17.00 -17.00 0.00 180.00 11175.00 85.44 304.24 8877.58 558.65 -3963.94 1266.53 17.00 -17.00 0.00 180.00 11200.00 81.19 304.24 8880.49 572.61 -3984.46 1287.87 17.00 -17.00 0.00 180.00 11223.95 77.12 304.24 8885.00 585.85 -4003.90 1308.08 17.00 -17.00 0.00 180.00 11225.00 76.94 304.24 8885.24 586.42 -4004.74 1308.96 17.00 -17.00 0.00 180.00 11250.00 72.69 304.24 8891.78 600.00 -4024.68 1329.68 17.00 -17.00 0.00 180.00 11275.00 68.44 304.24 8900.10 613.26 -4044.17 1349.94 17.00 -17.00 0.00 180.00 11300.00 64.19 304.24 8910.14 626.14 -4063.09 1369.61 17.00 -17.00 0.00 180.00 11320.00 60.79 304.24 8919.38 636.12 -4077.75 1384.85 17.00 -17.00 0.00 180.00 Map Map <:---- Latitude ----> <~-- Longitude ---> MD Incl Azim TVD +N/..S +FJ-W Northing Easting Deg Min Sec Deg Min Sec ft deg deg ft ft ft ft ft 9450.00 39.12 335.35 8660.95 -165.61 -2520.24 5979073.44 616367.92 70 21 5.725 N 149 3 18.521 W 9460.00 41.12 335.35 8668.60 -159.75 -2522.92 5979079.26 616365.14 70 21 5.783 N 149 3 18.599 W 9475.00 42.11 331.56 8679.81 -150.84 -2527.38 5979088.09 616360.55 70 21 5.870 N 149 3 18.729 W 9500.00 44.01 325.59 8698.09 -136.30 -2536.28 5979102.49 616351.41 70 21 6.013 N 149 3 18.990 W 9525.00 46.21 320.04 8715.73 -122.21 -2546.99 5979116.40 616340.48 70 21 6.152 N 149 3 19.303 W 9550.00 48.65 314.91 8732.65 -108.67 -2559.43 5979129.75 616327.83 70 21 6.285 N 149 3 19.667 W 9575.00 51.30 310.16 8748.73 -95.74 -2573.54 5979142.45 616313.51 70 21 6.412 N 149 3 20.079 W 9600.00 54.14 305.77 8763.88 -83.52 -2589.23 5979154.42 616297.64 70 21 6.532 N 149 3 20.538 W 9625.00 57.12 301.68 8778.00 -72.08 -2606.39 5979165.58 616280.30 70 21 6.644 N 149 3 21 .039 W 9650.00 60.22 297.87 8791.00 -61.49 -2624.92 5979175.87 616261.60 70 21 6.749 N 149 3 21.581 W 9675.00 63.43 294.29 8802.80 -51.82 -2644.71 5979185.23 616241.66 70 21 6.844 N 149 3 22.160 W 9700.00 66.72 290.90 8813.34 -43.12 -2665.64 5979193.60 616220.60 70 21 6.929 N 149 3 22.772 W 9704.25 67.29 290.34 8815.00 -41.74 -2669.30 5979194.92 616216.92 70 21 6.943 N 149 3 22.879 W 9725.00 70.08 287.68 8822.54 -35.45 -2687.58 5979200.92 616198.55 70 21 7.004 N 149 3 23.413 W 9750.00 73.50 284.60 8830.36 -28.86 -2710.38 5979207.15 616175.64 70 21 7.069 N 149 3 24.079 W 9775.28 77.00 281.59 8836.79 -23.32 -2734.19 5979212.30 616151.76 70 21 7.124 N 149 3 24.775 W 9800.00 79.88 285.05 8841.75 -17.74 -2757.75 5979217.51 616128.11 70 21 7.178 N 149 3 25.464 W 9825.00 82.83 288.49 8845.50 -10.61 -2781.41 5979224.27 616104.34 70 21 7.248 N 149 3 26.155 W 9850.00 85.81 291.88 8847.98 -2.02 -2804.75 5979232.48 616080.87 70 21 7.333 N 149 3 26.838 W 9875.00 88.80 295.25 8849.15 7.96 -2827.63 5979242.10 616057.83 70 21 7.431 N 149 3 27.507 W 9885.03 90.00 296.60 8849.26 12.35 -2836.66 5979246.34 616048.74 70 21 7.474 N 149 3 27.770 W 9900.00 91.26 294.22 8849.09 18.77 -2850.17 5979252.55 616035.13 70 21 7.537 N 149 3 28.166 W 9925.00 93.37 290.24 8848.08 28.22 -2873.29 5979261.63 616011.87 70 21 7.630 N 149 3 28.841 W 9950.00 95.46 286.24 8846.16 36.02 -2896.95 5979269.05 615988.08 70 21 7.707 N 149 3 29.533 W 9975.00 97.52 282.22 8843.33 42.13 -2921.02 5979274.77 615963.92 70 21 7.767 N 149 3 30.237 W 9993.17 99.00 279.27 8840.72 45.48 -2938.69 5979277.85 615946.21 70 21 7.799 N 149 3 30.753 W 10000.00 98.91 280.51 8839.66 46.64 -2945.33 5979278.90 615939.54 70 21 7.811 N 149 3 30.947 W 10025.00 98.56 285.05 8835.86 52.10 -2969.43 59792'83.98 615915.37 70 21 7.864 N 149 3 31.651 W 10050.00 98.15 289.58 8832.22 59.46 -2993.03 5979290.97 615891.65 70 21 7.937 N 149 3 32.341 W 10075.00 97.69 294.1 0 8828.78 68.67 -3016.01 5979299.81 615868.53 70 21 8.027 N 149 3 33.013 W 10100.00 97.18 298.61 8825.54 79.68 -3038.22 5979310.46 615846.15 70 21 8.135 N 149 3 33.662 W 10125.00 96.63 303.11 8822.54 92.40 -3059.52 5979322.84 615824.66 70 21 8.260 N 149 3 34.285 W 10150.00 96.04 307.60 8819.77 106.78 -3079.78 5979336.89 615804.17 70 21 8.402 N 149 3 34.877 W 10175.00 95.41 312.07 8817.28 122.71 -3098.87 5979352.52 615784.83 70 21 8.558 N 149 3 35.436 W 10198.17 94.80 316.22 8815.21 138.78 -3115.43 5979368.32 615768.02 70 21 8.716 N 149 3 35.920 W 10200.00 94.73 315.89 8815.06 140.09 -3116.70 5979369.61 615766.73 70 21 8.729 N 149 3 35.957 W 10225.00 93.78 311.48 8813.20 157.31 -3134.72 5979386.54 615748.44 70 21 8.898 N 149 3 36.484 W 10250.00 92.81 307.08 8811.77 173.1 0 -3154.03 5979402.03 615728.88 70 21 9.054 N 149 3 37.048 W 10275.00 91.82 302.69 8810.76 187.39 -3174.52 5979415.98 615708.17 70 21 9.194 N 149 3 37.647 W 10300.00 90.82 298.30 8810.18 200.06 -3196.05 5979428.32 615686.44 70 21 9.319 N 149 3 38.277 W 10320.42 90.00 294.72 8810.03 209.18 -3214.32 5979437.14 615668.03 70 21 9.408 N 149 3 38.811 W t BP Amoco (, Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB S Pad Well: S-17AL 1 Wellpath: S-17B Plan 9 Date: 7/18/2001 Time: 10:41 :35 Page: Co-ordinate(NE) Reference: Well: 5-17 AL 1, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: User (-165.61N,-2520.23E,335.00Azi) Plan: Plan #9 5 Survey Map Map <---- Latitude ----> <--- Longitude ---> MD Incl Azim TVD +N/-S +Fl-W Northing Easting Deg Min Sec Deg Min Sec ft deg deg ft ft ft ft ft 10325.00 90.00 293.89 8810.03 211.06 -3218.49 5979438.95 615663.83 70 21 9.427 N 149 3 38.933 W 10350.00 90.00 289.39 8810.03 220.28 -3241.73 5979447.80 615640.46 70 21 9.517 N 149 3 39.612 W 10375.00 90.00 284.89 8810.03 227.65 -3265.61 5979454.79 615616.46 70 21 9.590 N 149 3 40.310 W 10400.00 90.00 280.39 8810.03 233.12 -3290.00 5979459.87 615591.99 70 21 9.643 N 149 3 41.023 W 10425.00 90.00 275.89 8810.03 236.65 -3314.74 5979463.02 615567.20 70 21 9.678 N 149 3 41.746 W 10445.42 90.00 272.22 8810.03 238.10 -3335.11 5979464.14 615546.81 70 21 9.692 N 149 3 42.342 W 10450.00 89.94 273.04 8810.04 238.31 -3339.68 5979464.27 615542.24 70 21 9.694 N 149 3 42.475 W 10475.00 89.63 277.53 8810.13 240.61 -3364.57 5979466.18 615517.32 70 21 9.717 N 149 3 43.203 W 10500.00 89.32 282.02 8810.36 244.85 -3389.20 5979470.03 615492.63 70 21 9.758 N 149 3 43.923 W 10525.00 89.01 286.51 8810.72 251.01 -3413.42 5979475.80 615468.31 70 21 9.819 N 149 3 44.631 W 10550.00 88.71 291.00 8811.22 259.04 -3437.08 5979483.46 615444.53 70 21 9.898 N 149 3 45.322 W 10575.00 88.42 295.49 8811.85 268.90 -3460.04 5979492.95 615421.42 70 21 9.995 N 149 3 45.994 W 10600.00 88.13 299.98 8812.60 280.53 -3482.15 5979504.22 615399.13 70 21 10.109 N 149 3 46.640 W 10625.00 87.86 304.48 8813.47 293.85 -3503.28 5979517.21 615377.79 70 21 10.240 N 149 3 47.258 W 10645.42 87.65 308.15 8814.27 305.93 -3519.72 5979529.02 615361.16 70 21 10.359 N 149 3 47.738 W 10650.00 87.07 308.73 8814.48 308.77 -3523.30 5979531.81 615357.54 70 21 10.386 N 149 3 47.843 W 10675.00 83.89 311.93 8816.45 324.90 -3542.30 5979547.63 615338.29 70 21 10.545 N 149 3 48.399 W 10700.00 80.74 315.17 8819.80 341.96 -3560.25 5979564.41 615320.07 70 21 10.713 N 149 3 48.924 W 10725.00 77.61 318.47 8824.49 359.86 -3577.05 5979582.03 615302.99 70 21 10.889 N 149 3 49.415 W 10745.42 75.09 321.22 8829.31 375.02 -3589.85 5979596.99 615289.95 70 21 11.038 N 149 3 49.789 W 10750.00 75.23 320.38 8830.49 378.45 -3592.64 5979600.38 615287.10 70 21 11.071 N 149 3 49.871 W 10775.00 76.08 315.82 8836.68 396.47 -3608.82 5979618.13 615270.65 70 21 11.249 N 149 3 50.344 W 10800.00 77.00 311.29 8842.51 413.22 -3626.43 5979634.60 615252.77 70 21 11.413 N 149 3 50.859 W 10825.00 78.01 306.79 8847.92 428.59 -3645.39 5979649.66 615233.58 70 21 11.564 N 149 3 51.413 W 10835.20 78.44 304.97 8850.00 434.44 -3653.48 5979655.39 615225.39 70 21 11.622 N 149 3 51.650 W 10850.00 79.08 302.34 8852.89 442.48 -3665.56 5979663.23 615213.19 70 21 11.701 N 149 3 52.003 W 10875.00 80.22 297.91 8857.38 454.82 -3686.83 5979675.23 615191.73 70 21 11.822 N 149 3 52.625 W 10900.00 81.42 293.52 8861.37 465.52 -3709.06 5979685.58 615169.33 70 21 11.927 N 149 3 53.275 W 10925.00 82.66 289.15 8864.83 474.53 -3732.11 5979694.22 615146.14 70 21 12.016 N 149 3 53.949 W 10950.00 83.95 284.81 8867.75 481.77 -3755.85 5979701.09 615122.29 70 21 12.087 N 149 3 54.643 W 10975.00 85.27 280.49 8870.10 487.22 -3780.13 5979706.15 615097.93 70 21 12.140 N 149 3 55.353 W 10995.42 86.37 276.97 8871.59 490.31 -3800.26 5979708.92 615077.76 70 21 12.171 N 149 3 55.941 W 11000.00 86.47 277.79 8871.87 490.90 -3804.79 5979709.43 615073.22 70 21 12.176 N 149 3 56.073 W 11025.00 87.03 282.26 8873.29 495.24 -3829.37 5979713.38 615048.58 70 21 12.219 N 149 3 56.792 W 11050.00 87.61 286.73 8874.46 501.49 -3853.54 5979719.25 615024.31 70 21 12.280 N 149 3 57.498 W 11075.00 88.21 291.19 8875.37 509.61 -3877.16 5979726.99 615000.57 70 21 12.360 N 149 3 58.189 W 11100.00 88.82 295.65 8876.02 519.54 -3900.08 5979736.55 614977.49 70 21 12.457 N 149 3 58.859 W 11125.00 89.43 300.11 8876.40 531.23 -3922.17 5979747.89 614955.22 70 21 12.572 N 149 3 59.505 W 11148.17 90.00 304.24 8876.52 543.56 -3941.78 5979759.91 614935.42 70 21 12.694 N 149 4 0.078 W 11150.00 89.69 304.24 8876.52 544.59 -3943.29 5979760.92 614933.89 70 21 12.704 N 149 4 0.123 W 11175.00 85.44 304.24 8877.58 558.65 -3963.94 5979774.64 614913.03 70 21 12.842 N 149 4 0.726 W 11200.00 81.19 304.24 8880.49 572.61 -3984.46 5979788.28 614892.29 70 21 12.979 N 149 4 1 .326 W 11223.95 77.12 304.24 8885.00 585.85 -4003.90 5979801.20 614872.64 70 21 13.109 N 149 4 1 .895 W 11225.00 76.94 304.24 8885.24 586.42 -4004.74 5979801.76 614871.79 70 21 13.115 N 149 4 1.919 W 11250.00 72.69 304.24 8891.78 600.00 -4024.68 5979815.02 614851.64 70 21 13.248 N 149 4 2.502 W 11275.00 68.44 304.24 8900.10 613.26 -4044.17 5979827.97 614831.95 70 21 13.378 N 149 4 3.072 W 11300.00 64.19 304.24 8910.14 626.14 -4063.09 5979840.54 614812.83 70 21 13.505 N 149 4 3.625 W 11320.00 60.79 304.24 8919.38 636.12 -4077.75 5979850.29 614798.01 70 21 13.603 N 149 4 4.054 W I( BP Amoco 1( Planning Report - Geographic Company: BP Amoco Field: Prudhoe Bay Site: PB S Pad Well: S-17AL 1 Wellpath: 8-17B Plan 9 Targets Date: 7/18/2001 Time: 10:41:35 Page: Co-ordinate(NE) Reference: Well: 8-17 AL 1, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: User (-165.61N,-2520.23E,335.00Azi) Plan: Plan #9 6 Name Description Map Map <---- Latitude ----> <... Longitude ---> TVD +N/-S +FJ- W Northing Easting Deg Min Sec Deg Min Sec ft ft ft ft ft 8815.00 426.24 -3504.02 5979649.56 615374.95 70 21 11.542 N 149 3 47.281 W 8850.00 141.26 -2873.37 5979374.64 616009.99 70 21 8.742 N 149 3 28.845 W 8885.00 659.50 -4025.45 5979874.50 614849.92 70 21 13.833 N 149 4 2.526 W S17Bt4.10 817B t2.10 S17Btd.10 ( { DATE 07/06/01 CHECK NO. 00193317 H 19331.7 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT NET 070201 CKO70201D PYMT OMMENTS: HANDL NG INST: 100.00 100.00 Per it to Drill ee 5tH - Terrie Hub Ie X4628 or Sandra Ste man X4750 ~- \ 7 B ~HE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL CITY BANK CLEVELAND,. OHIO 18,3317 CONSOLIDATED COMMERCIAL ACCOUNT '.' r:. ....':-- . . d~E.'HU~DRED & 00/ 1 OQ~'**~************i~*~:it,~~**~********** d~ D,~LLAR <, ." . ".' ',.'.:'.: .,..,t)AT8<o'.JxMOlJNT:. , ' < ~~ l~~l 0 1);:1/1;;\1;::,1; < ' ;¡¡ . ":~;10~;.~+ .:: NqTVALlP~FTEFd2Ò..DAYS\.: ",.'.." '.: ." 56"389 ~. PAY """"'. "'" To The ORDER Of ':~g~:!~ ~¡¥~~~~ï~~~~ ~S:ï9~I'Ì SU I TE lèO> ". :" " . ANCHORAgre .. ... ~,. . tlJJp~~'1,; .,:..,', AK 99501 III ~ Ii ~ ~ ~ ? III I: 0... ~ 2 0 ~ a 11 5 I: 0 0 a ...... ~ q III CHECK 1 STANDARD LETTER DEVELOPMENT DEVELOPMENT RED RILL EXPLORATION INJECTION WELL INJECTION WELL REDRILL ( 1\, TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERJP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME (If api number last two (2) digits are between 60-69) PILOT HOLE (PH) ANNUL~ ANNULAR DISPOSAL <--> YES ANNULAR DISPOSAL THIS WELL fl5!/ 3 ~ /76 "CLUE" The permit is for a new well bore segment of existing well . Permit No, API No. . Production should continue to be reported as a function of the original API number stated above. In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). Annular disposal has not been requested. . . Annular Disposal of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved. . . DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . . ANNULUS <--> YES + SPACING EXCEPTION Templates are located m drive\jody\templates Enclosed is the approved application for permit to drill the above referenced well. The permit is approved' subject to full compliance with 20 AAC 25.055. Approval to peñorate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. APPR .t¿ COMPANY WELL NAME6"" / 7 B PROGRAM: exp - dev - redrll serv well bore sag _ann. disposal para req - INIT CLASS"""'V I -- GEOL AREA J UNIT# (')/1 t?S-6 ON/OFF SHORE (jy¡ 1.Pennitfeeattached....................... QN '" 1: ~: t~:en=~~:::n~~~:;;b~r::. '- '. -- '. .. '. .. '. '. '. '. -. '. '. '. '~ 1:k~ ~ J 0 ::::: ~ i::t 2;:M z ::S1z~ t~~~c I-c K- 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y , N 5. Well located proper distance from drilling unit boundary. . . . N 6. Well located proper distance from other wells.. . . . . . . . . N 7. Sufficent acreage available' in drilling unit.. . . . . . . . . . . ;'\, N. 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . j N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Pennit can be issued without conservation order. . . . . . . . N 12. Pennit can.be issued without administrative approval.. . . . . N 13. Can permit be approved before 15-day wait.. . . . . . . . . . N 14. Conductor string provided. . . . . . . . .. . . . . . . . . . &; N"1 . ~~: ~~~~r::~~~gt,:~~II:;O: ~~~':~r & ~urt ;";g: : : : : ~ ~ ) <;'~"GL ~ ~ L~\ ~ ~ "\. I>$.. \ \ 17. CMT vol adequate to tie-in long string to suñ csg. . . . . . . . y~ N 18. CMT will cover all known productive horizons. . . . . '. . . . . ~ N 19. Casing designs adequate for C, T. 8 & permafrost. . . . . . . ffi N .... ~~: ~~::~I~~~a~~ ~~':~~:;.d~n;"~rrt ¡'~e~ ~pp;o~';'¡: : : y ~ - ~~~::.I ~ co rt ~ ~~<i.. ~ ,+ 22. Adequate well bore separation proposed.. . . . . . . . . . . . ø N 23. If diverter required, does it meet regulations. . . . . . . . . . Y N.)...J~ 24. Drilling .fluid program schematic & equip list adequate. . . . . I N . Qð TE . ~~: ~g=~Spr:.:".:==~~~~:nt~sÌt~ . . . . '?, q)6' ~s¡g: ~ ~'?\' €"?-'¡~~?) ~ ~~ 'j, ~'! ~.JlA 27. Choke manifold complies w/API RP-53 (May 84)'". . . . . . . . N 28. Work will occur without operation shutdown. . . . . . . . . . . N. " ~" \. . 29. IspresenceofHoSgasprobable................. ~~ \\d<:"">""'\'Y'~\'1);~'~"'<;'" ~\"~~d$/ê."s.a~",~o\<\"¡:-'~' ~: ~=::':'~S~~~":.'~i~r:,~~~~~~ez:~::u.r~s.. ........ ~ - 3D~ ~ /?1Lf~v '~ ? 2~, V/O I 32. Seismic anal~~is of shallo~ gas zones. . . . . . . . ~. . . '. ~ ,N. ' , DATE 33. Seabed condition survey (If off-shore). . . . . . . . . ... Y N , 7- f c¡ . D/ 34. Contact name/phone for weekly progress reports [expl atoty only] Y N . , A NULAR DISPOSAL35. With proper cementing records, this plan . (A) will contain waste in a suitable receiving zone; . . . . . . . (B) will not contaminate frèshwater; or cause drilling waste. .. to surface;" " (C) will not impair mechanical integrity of the well used for disposal; Y N (0) will not damage producing formation or impair recovery from a Y N pool; and ,,' E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINEERING:' UIC/Annular COMMISSION: wr:x------ '8~s Ú)T ~¡; - JMH WELL PERMIT CHECKLIST FIELD & POOL ADMINISTRA TION AP DATj:. 7/'/ eO/ ENGINEERING c 0 Z 0 -4 :E :;0 (" - -4' m - Z -4 .:I: GEOLOGY - DATE Y N Y N .~~ en :Þ ::a m » ( ,-- ~Þ8* Com ments/lnstructions: c:\msoffice\wordian\diana\checklist (rev. 11/011100) '1 i ~ Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Permitting Process but is part of the history file. . To improve the readability of the Well History file and to simplify finding information, infonnation of this nature is accumulated at the end of the file under APPENDIX. No special "effort has been made to chronologically , . organize this category of information. 1 (" I~ cXO/-11./5 I J54ft:; Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Feb 26 15:56:11 2003 Reel Header Service name........... ..LISTPE Date.....................03/02/26 Origin...................STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date.....................03/02/26 Origin...................STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA PSI-01 500292310400 BP Exploration (Alaska) Inc. Sperry-Sun Drilling Services 26-FEB-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 1 AK-MW-22123 J. BOBBITT D. FERGUSON MWDRUN 2 AK-MW-22123 J. BOBBITT D. FERGUSON MWDRUN 3 AK-MW-22123 J. BOBBITT B. DECKER # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 15 11N 15E 3800 4579 .00 51.05 17.60 # WELL CASING RECORD 1ST STRING 2ND STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 16.000 20.000 113.0 12.250 13.375 5108.0 ( ( 3RD STRING PRODUCTION STRING 8.500 9.625 9289.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY (DGR), UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AND PRESSURE WHILE DRILLING (PWD). 5. MWD RUN 3 COMPRISED DIRECTIONAL WITH DGR; EWR4; COMPENSATED NEUTRON POROSITY (CNP); AND STABILIZED LITHO-DENSITY (SLD). DUE TO A TOOL FAILURE, NO RESISTIVITY DATA WERE ACQUIRED FOR THIS RUN. 6. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED-HOLE GAMMA RAY LOG RUN IN PSI-01 ON 5 AUGUST 2002. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVIDED BY DEWAYNE SCHNORR ON 12 NOVEMBER 2002. 7. MWD RUNS 1 - 3 REPRESENT WELL PSI-01 WITH API#: 50-029-23104-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 9735'MD/8663'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SPSF = SMOOTHED NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE). SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE. SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN) . SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN) . SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 8.5" MUD WEIGHT: 9.05 - 9.1 PPG MUD SALINITY: 14,000 PPM CHLORIDES ( ( 50,000 PPM CHLORIDES FORMATION WATER SALINITY: FLUID DENSITY: 1.0 GICC MATRIX DENSITY: 2.65 GICC LITHOLOGY: SANDSTONE $ File Header Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/26 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX NCNT FCNT NPHI PEF DRHO RHOB $ 1 clipped curves; all bit runs merged. .5000 START DEPTH 221.0 276.0 5101.0 5101.0 5101.0 5101.0 5101.0 9218.5 9218.5 9218.5 9286.5 9286.5 9286.5 STOP DEPTH 9697.0 9733.5 9256.5 9256.5 9256.5 9256.5 9256.5 9648.5 9648.5 9648.5 9658.0 9658.0 9658.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ------ BASELINE 221.0 8913.0 8925.5 8943.0 8947.5 8967.5 8985.0 8996.5 9006.0 9014.5 9029.5 9033.0 9039.0 9049.0 9051.5 9052.5 9069.5 9087.0 9089.0 9093.0 9109.5 9111.5 9120.0 DEPTH GR 220.5 8912.5 8926.0 8943.0 8946.5 8966.0 8984.5 8995.5 9005.0 9013.5 9028.5 9031.5 9038.5 9048.5 9051.0 9052.5 9069.0 9086.0 9089.5 9092.5 9108.5 9110.5 9119.5 (' { 9125.0 9130.5 9147.0 9164.0 9166.5 9174.5 9179.5 9189.5 9207.0 9212.0 9214.0 9220.0 9223.0 9225.5 9227.0 9230.5 9234.0 9243.0 9249.0 9254.0 9256.5 9268.0 9269.5 9272.0 9273.0 9278.5 9281.5 9286.5 9288.5 . 9294.5 9302.0 9308.0 9317.5 9329.0 9333.5 9365.0 9368.0 9392.5 9411.0 9412.5 9419.5 9433.0 9441.5 9445.0 9459.5 9466.5 9469.0 9476.0 9479.0 9482.0 9486.5 9488.5 9515.5 9523.5 9530.5 9537.5 9541.5 9544.0 9546.5 9553.5 9555.5 9560.5 9565.0 9567.5 9571.5 9124.5 9129.5 9147.0 9162.5 9165.5 9173.5 9178.5 9188.5 9206.0 9210.5 9212.5 9219.0 9222.0 9224.5 9226.0 9229.5 9233.0 9241.5 9247.5 9252.5 9255.0 9266.5 9268.5 9270.5 9273.0 9280.5 9284.0 9288.5 9290.5 9296.5 9304.0 9309.5 9319.0 9330.5 9335.0 9367.0 9369.5 9392.5 9412.0 9413.5 9420.0 9433.0 9442.0 9445.0 9459.5 9467.0 9469.5 9475.0 9477.5 9482.5 9486.0 9488.0 9514.5 9523.5 9530.5 9537.5 9541.0 9544.0 9546.0 9552.5 9555.0 9560.0 9563.5 9567.5 9570.5 ( 9574.0 9579.5 9585.5 9591.5 9603.0 9606.5 9613.0 9617.0 9623.5 9627.0 9630.5 9631.5 9634.0 9641.0 9644.5 9648.5 9649.5 9652.0 9657.0 9733.5 $ 9573.5 9578.5 9584.5 9590.5 9602.0 9605.5 9613.0 9617.0 9623.5 9627.0 9631.0 9633.0 9635.5 9642.5 9647.0 9650.0 9651.5 9654.0 9658.5 9735.0 # MERGED DATA PBU TOOL MWD MWD MWD $ SOURCE CODE BIT RUN NO 1 2 3 MERGE TOP 220.5 5125.5 9300.0 MERGE BASE 5125.5 9300.0 9735.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units......... ..Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 NPHI MWD PU-S 4 1 68 32 9 FCNT MWD CNTS 4 1 68 36 10 NCNT MWD CNTS 4 1 68 40 11 RHOB MWD G/CM 4 1 68 44 12 DRHO MWD G/CM 4 1 68 48 13 PEF MWD BARN 4 1 68 52 14 Name Service Unit DEPT FT Min 221 Max 9733.5 Mean Nsam 4977.25 19026 { First Reading 221 Last Reading 9733.5 i i ( ( ROP MWD FT/H 0.18 848.37 195.858 18915 276 9733.5 GR MWD API 12.88 395.04 69.1852 18953 221 9697 RPX MWD OHMM 0.13 33.72 2.80348 8312 5101 9256.5 RPS MWD OHMM 0.1 1063.9 2.9707 8312 5101 9256.5 RPM MWD OHMM 0.08 1559.41 3.2174 8312 5101 9256.5 RPD MWD OHMM 0.1 1704.87 3.64476 8312 5101 9256.5 FET MWD HOUR 0.0764 90.2153 1.17873 8312 5101 9256.5 NPHI MWD PU-S 9.94 81.76 29.9097 861 9218.5 9648.5 FCNT MWD CNTS 416.25 1460.14 876.244 861 9218.5 9648.5 NCNT MWD CNTS 2203.92 4197.64 3295.78 861 9218.5 9648.5 RHOB MWD G/CM 1.938 3.105 2.2889 744 9286.5 9658 DRHO MWD G/CM -0.099 0.81 0.0320202 744 9286.5 9658 PEF MWD BARN 1.55 7 2.3681 744 9286.5 9658 First Reading For Entire File........ ..221 Last Reading For Entire File.......... .9733.5 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/26 Maximum Physical Record. .65535 File Type................LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/26 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 220.5 275.5 STOP DEPTH 5069.0 5125.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): 26-JUL-02 Insite 66.37 Memory 5125.0 220.0 5125.0 ( HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 .0 36.0 TOOL NUMBER 142827 16.000 113.0 SPUD 9.35 142.0 9.2 1100 9.0 .000 .000 .000 .000 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 ( .0 91.0 .0 .0 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 220.5 5125.5 2673 9811 220.5 5125.5 ROP MWD010 FT/H 0.44 848.37 205.238 9701 275.5 5125.5 GR MWD010 API 14.24 107.99 51.509 9698 220.5 5069 First Reading For Entire File......... .220.5 Last Reading For Entire File.......... .5125.5 (' File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/26 Maximum Physical Record..65535 File Type..... .......... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/26 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR FET RPD RPM RPS RPX ROP $ 3 ( header data for each bit run in separate files. 2 .5000 START DEPTH 5069.5 5100.5 5100.5 5100.5 5100.5 5100.5 5126.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ # STOP DEPTH 9262.5 9255.0 9255.0 9255.0 9255.0 9255.0 9300.0 01-AUG-02 Insite 66.37 Memory 9300.0 5125.0 9300.0 17.9 35.2 BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER 066093 081797 12.250 (' DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O ( 5108.0 LSND 10.35 54.0 9.2 700 2.8 2.100 1.110 2.250 2.600 66.0 131.0 66.0 66.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5069.5 9300 7184.75 8462 5069.5 9300 ROP MWD020 FT/H 0.18 651.51 199.957 8349 5126 9300 GR MWD020 API 12.88 395.04 89.5894 8387 5069.5 9262.5 RPX MWD020 OHMM 0.13 33.72 2.80248 8310 5100.5 9255 RPS MWD020 OHMM 0.1 1063.9 2.96966 8310 5100.5 9255 RPM MWD020 OHMM 0.08 1559.41 3.21646 8310 5100.5 9255 RPD MWD020 OHMM 0.1 1704.87 3.64389 8310 5100.5 9255 FET MWD020 HOUR 0.0764 90.2153 1.17859 8310 5100.5 9255 First Reading For Entire File......... .5069.5 Last Reading For Entire File.......... .9300 ( File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.. .... .03/02/26 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/26 Maximum Physical Record..65535 File Type................LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE NCNT FCNT NPHI GR DRHO RHOB PEF ROP $ 4 ( header data for each bit run in separate files. 3 .5000 START DEPTH 9217.5 9217.5 9217.5 9263.0 9288.5 9288.5 9288.5 9300.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 CNP SLD $ STOP DEPTH 9650.0 9650.0 9650.0 9698.5 9659.5 9659.5 9659.5 9735.0 05-AUG-02 Insite 66.37 Memory 9735.0 9300.0 9735.0 15.5 17.8 BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 COMPENSATED NEUTRON STABILIZED LITHO DEN TOOL NUMBER 124725 160816 78940 67985 # ( BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O ( 8.500 9289.0 LSND 9.10 47.0 910.0 14000 3.2 .250 .120 .220 .280 73.0 156.0 73.0 73.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 NPHI MWD030 PU-S 4 1 68 12 4 FCNT MWD030 CNTS 4 1 68 16 5 NCNT MWD030 CNTS 4 1 68 20 6 RHOB MWD030 G/CM 4 1 68 24 7 DRHO MWD030 G/CM 4 1 68 28 8 PEF MWD030 BARN 4 1 68 32 9 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9217.5 9735 9476.25 1036 9217.5 9735 ROP MWD030 FT/H 1.13 448 51.7845 870 9300.5 9735 GR MWD030 API 16.82 336.62 69.87 872 9263 9698.5 NPHI MWD030 PU-S 9.94 81.76 30.2249 866 9217.5 9650 FCNT MWD030 CNTS 416.25 1460.14 872.924 866 9217.5 9650 NCNT MWD030 CNTS 2203.92 4197.64 3288.51 866 9217.5 9650 RHOB MWD030 GICM 1.938 3.105 2.28845 743 9288.5 9659.5 DRHO MWD030 GICM -0.099 0.81 0.0318048 743 9288.5 9659.5 PEF MWD030 BARN 1.55 7 2.36526 743 9288.5 9659.5 .. ( First Reading For Entire File......... .9217.5 Last Reading For Entire File.......... .9735 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation. ...,. .03/02/26 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF Tape Trailer Service name............ .LISTPE Date.....................03/02/26 Origin...................STS Tape Name.......... ..... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Reel Trailer Service name............ .LISTPE Date.....................03/02/26 Origin...................STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Physical EOF Physical EOF End Of LIS File (' Scientific Technical Services Scientific Technical Services ( ~ \ dOJ-NS /oo,~ . . * * * * REEL HEADER * *.* * MWD 02/05/31 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 02/05131 188780 01 1.75" NaviGamma - Gamma Ray *** LIS COMMENT RECORD *** ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Remark File Version 1.000 Extract File: ldwg.las ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! -Version Information VERSo WRAP. -Well Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 9451.0000: STOP.FT 10317.0000: STEP.FT 0.5000: NULL. -999.2500: COMPo COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API. API NUMBER: -Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 35 TOWN.N T12N RANG. R14E PDAT. MSL EPD .F 0 LMF . RKB FAPD.F 67.48 DMF KB EKB .F 67.48 EDF .F N/A EGL .F N/A CASE.F N/A OSl . DIRECTIONAL -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All Gamma Ray data (GRAX) and resistivity data (RACEHX, RPCELX) presented is real time data (intervals 9475' MD to 9952' MD and 10090' to 10290' MD). Gamma Ray (GRAM) and Resistivity data (RACLM, RPCLM) presented are memory data (interval 9960' to 10086' MD). Well S-17B was drilled as a sidetrack on well S-17AL1. The sidetrack (TOW) began on MWD Run #3 at 9475' MD (8680' SSTVD). Baker Hughes INTEQ utilized the Orient Express with Ultra Slim Multiple 1.20: NO: CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ------------------------------- Starting Depth Ending Depth I.f7.ve1 Spacing Absent Value BP Exploration (Alaska), Inc. S-17B Prudhoe Bay Unit 2204' SNL, 712' EWL North Slope Alaska Baker Hughes INTEQ NaviGamma, USMPR 13-Aug-01 500292114802 Description ------------------------------- Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 (4) ( 5) (6) I( I~ Propagation Resistivity (USMPR) services from 9475' MD (8680' SSTVD) to 10317' MD (8814' SSTVD). (7) The interval from 10288' MD (8815' SSTVD) to 10317' MD (8814' SSTVD) was not logged due to sensor to bit offset. (8) Well S-17B was drilled to TD at At 10317' MD BHI is replaced by (9) The data presented is final.The supplied by BPX (SWS, 31-Aug-1984) was not possible. (10) A Magnetic Declination correction of 26.43 degrees has been applied to the Directional Surveys. (11) For the purpose of database loading, MWD and RWD data has been merged as MWD 10445' MD (8815' SSTVD). Anadrill. depth shifting to PDC (Primary Depth Control) data. GRAX ROPS TVD RACLX RPCLX RACHX RPCHX RPCEHX Corrected [MWD] RACEHX -> Gamma Ray MWD-API [MWD] (MWD-API units) -> Rate of Penetration, (feet/hour) -> Subsea True Vertical Depth (SSTVD) , (feet) -> Resistivity Attenuation, 400 kHz. Compo Borehole Corrected [MWD] -> Resistivity Phase Difference, 400 kHz. Compo Borehole Corrected [MWD] -> Resistivity Attenuation, 2 MHz. Compo Borehole Corrected [MWD] -> Resistivity Phase Difference, 400 kHz. Compo Borehole Corrected [MWD] -> Resistivity Phase Difference, 2 MHZ. Compo Borehole/Dielectric -> Resistivity Attenuation, 2 MHz. Compo Borehole/Dielectric Corrected [MWD] [MWD] RACEHX -> Resistivity Attenuation, 2 MHz. Compo Borehole/Dielectric Corrected SENSOR OFFSETS: RUN N/A GAMMA N/A DIRECTIONAL N/A SURFACE EQUIPMENT: Main Surface system software: MSS4 version 4.03, Drillbyte Memory dump system software: D-Series rev 1.03/PowerComms Rev 1.0 DOWNHOLE EQUIPMENT: Natural Gamma Ray Sensor: NaI Scintillation counter MPR Resistivity: 2 MHz and 400 kHz electromagnetic wave RWD Memory update rates: Gamma Ray 10 seconds : MPR Resistivity 5 seconds Note: Each of the resistivity mesurements has an upper limit to its mesurement specification. Above these values the traces can show an exagerrated response. 2 MHz Resistivity from Phase Difference 3000 Ohm-m 2 MHz Resistivity from Attenuation 500 Ohm-m 400 kHz Resistivity from Phase Difference 1000 Ohm-m 400 kHz Resistivity from Attenuation 200 Ohm-m LOG ENVIRONMENTAL CORRECTIONS: Gamma Ray: Corrected for sensor type and collar size. No correction has been applied for nominal borehole size, mud weight or potassium content. Resistivity: Corrected for tool size, nominal hole size and mud resistivity. Compensated readings obtained by use of dual transmitter configuration. CURVE SHIFT DATA BASELINE, MEASURED, N/A N/A DISPLACEMENT N/A Tape Subfile: 1 98 records... Minimum record length: Maximum record length: 8 bytes 132 bytes **** FILE HEADER **** { ( MWD .001 1024 *** INFORMATION TABLE: CONS MN"EM VALU -------------------------------------- WDFN LCC CN WN FN COUN STAT mwd.xtf 150 BP Exploration (Alaska), Inc. S-17B Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 1. The data presented is the field raw data. 2. The data could not be depth matched to the PDC supplied by BPX 3. The PDC used is a Schlumberger Gamma Ray dated 31-Aug-84. *** INFORMATION TABLE: CIFO MN"EM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR GR GRAX 0.0 ROP ROP ROPS 0.0 RACL RACL RACLX 0.0 RACH RACH RACHX 0.0 RPCL RPCL RPCLX 0.0 RPCH RPCH RPCHX 0.0 RPEH RPEH RPCEHX 0.0 RAEL RAEL RACELX 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 36 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: One depth per frame (value= 0) Datum Specification Block Sub-type is: 28 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 API 4 4 2 ROP MWD 68 1 F/HR 4 4 3 RACL MWD 68 1 OHMM 4 4 4 RACH MWD 68 1 OHMM 4 4 5 RPCL MWD 68 1 OHMM 4 4 6 RPCH MWD 68 1 OHMM 4 4 7 RPEH MWD 68 1 OHMM 4 4 8 RAEL MWD 68 1 OHMM 4 4 ------- 32 Total Data Records: 62 ~' ~. Tape File Start Depth 9451.000000 Tape File End Depth = 10317.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subtile: 2 77 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** TAPE TRAILER **** MWD 02/05/31 188780 01 **** REEL TRAILER **** MWD 02/05/31 BHI 01 Tape Subtile: 3 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subf ile 1 is type: LIS Tape Subtile 2 is type: LIS DEPTH GR Rap RACL RACH RPCL RPCH RPEH RAEL 9451.0000 81.8860 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9451.5000 88.7430 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9500.0000 263.8830 21.4390 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9600.0000 599.3340 45.3830 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9700.0000 22.5320 81. 8080 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9800.0000 31.3380 78.0690 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9900.0000 22.6870 94.1160 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10000.0000 24.0980 -999.2500 14.0070 10.5440 12.5890 14.1710 -999.2500 -999.2500 10100.0000 25.1520 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 6.8400 8.628C 10200.0000 -999.2500 10300.0000 -999.2500 10317.0000 -999.2500 ,( 24.3510 7.2460 -999.2500 -999.2500 -999.2500 -999.2500 102.8950 7.5790 4.3530 -999.2500 6.3750 -999.2500 Tape File Start Depth 9451.000000 Tape File End Depth = 10317.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet Tape Subfile 3 is type: LIS 7.5240 7.0470 -999.2500 -999.2500 -999.2500 -999.2500 ( -999.2500 -999.2500 -999.2500 S-17B SurveyHDR.txt S-17B 50-029-21148-02 9462 10445 Schlumberger - Anadrill 4P1846 BP Exploration (Alaska) 10817 D Page 1 S-17B Survey PTS.txt 9462.00 39.20 334.20 9499.00 46.80 333.00 9532.00 53.00 330.00 9562.00 57.00 326.00 9598.00 59.20 319.60 9631.00 60.40 315.10 9661.00 63.10 309.20 9693.00 66.50 305.50 9723.00 72.40 303.70 9753.00 77.90 302.00 9783.00 81.50 304.50 9813.00 83.40 308.50 9843.00 84.50 313.50 9873.00 85.80 318.00 9903.00 86.40 318.60 9933.00 86.70 313.50 9978.00 88.70 302.80 10010.00 91.90 306.30 10062.00 94.80 312.30 10093.00 95.20 317.20 10157.00 96.70 312.30 10176.00 97.80 309.50 10204.00 96.60 308.10 10230.00 94.10 306.00 10254.00 91.10 306.70 10312.00 91.70 292.90 10333.00 91.90 289.30 10370.00 90.53 281.11 10445.00 90.53 281.11 Page 1 ANADRILL SCHLUMBERGER Survey report 17-Aug-2001 01:56:45 Page 1 of 2 Client...................: BP Exploration (Alaska) Inc. Field....................: Prudhoe Bay Unit Well.....................: S-17B Spud date................: API number...............: 50-029-21148-02 Last survey date.........: 17-Aug-01 Engineer.................: M. Brown Total accepted surveys...: 29 MD of first survey.......: 9462.00 ft COUNTY:..................: Nabors 3S / Dowell # 4 MD of last survey........: 10445.00 ft STATE:...................: Alaska ----- Survey calculation methods------------- ----- Geomagnetic data ---------------------- Method for positions.....: Minimum curvature Magnetic model...........: BGGM version 2000 Method for DLS...........: Mason & Taylor Magnetic date............: 00-Y- 0 Magnetic field strength..: -999.25 HCNT ----- Depth reference ----------------------- Magnetic dec (+E/W-).....: -999.25 degrees Permanent datum..........: Mean Sea Level Magnetic dip.............: -999.25 degrees Depth reference..........: Gr Tiein 9260 GL above permanent.......: -50000.00 ft ----- MWD survey Reference Criteria --------- KB above permanent.......: 67.50 ft Reference G..............: 1000.00 mGal DF above permanent.......: -50000.00 ft Reference H..............: 1000.00 HCNT Reference Dip............: 0.00 degrees ----- Vertical section origin---------------- Tolerance of G...........: (+/-) 2.50 mGal Latitude (+N/S-).........: 0.00 ft Tolerance of H...........: (+/-) 6.00 HCNT Departure (+E/W-)........: 0.00 ft Tolerance of Dip.........: (+/-) 0.45 degrees ----- Platform reference point--------------- ----- Corrections --------------------------- Latitude (+N/S-).........: -999.25 ft Magnetic dec (+E/W-).....: -57252.81 degrees Departure (+E/W-)........: -999.25 ft Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: -57252.81 degrees Azimuth from rotary table to target: 279.40 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N)........: No degree: 0.00 [(c)2001 Anadrill IDEAL ID6_1C_10] ANADRILL SCHLUMBERGER Survey Report 17-Aug-2001 01:56:45 Page 2 of 2 === ======== ====== ======= ====== ======== ======== ================ =============== ===== ===== ====== Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type === ======== ====== ======= ====== ======== ======== ================ =============== ===== ===== ====== 1 9462.00 39.20 334.20 0.00 8670.25 2463.64 -158.75 -2523.45 2528.44 266.40 0.00 TIP - 2 9499.00 46.80 333.00 37.00 8697.29 2478.40 -136.17 -2534.68 2538.33 266.92 20.66 MWD - 3 9532.00 53.00 330.00 33.00 8718.54 2493.92 -114.02 -2546.74 2549.29 267.44 20.03 MWD - 4 9562.00 57.00 326.00 30.00 8735.75 2510.18 -93.20 -2559.77 2561.47 267.91 17.23 MWD - 5 9598.00 59.20 319.60 36.00 8754.79 2532.38 -68.89 -2578.25 2579.17 268.47 16.28 MWD - 6 9631.00 60.40 315.10 33.00 8771.39 2554.87 -47.93 -2597.57 2598.02 268.94 12.33 MWD - 7 9661.00 63.10 309.20 30.00 8785.60 2577.09 -30.22 -2617.16 2617.34 269.34 19.52 MWD - 8 9693.00 66.50 305.50 32.00 8799.23 2602.66 -12.67 -2640.18 2640.21 269.73 14.91 MWD - 9 9723.00 72.40 303.70 30.00 8809.75 2628.07 3.27 -2663.30 2663.30 270.07 20.45 MWD - 10 9753.00 77.90 302.00 30.00 8817.44 2654.66 18.99 -2687.65 2687.72 270.40 19.13 MWD - 11 9783.00 81.50 304.50 30.00 8822.80 2681.65 35.17 -2712.33 2712.55 270.74 14.53 MWD - 12 9813.00 83.40 308.50 30.00 8826.75 2708.12 52.86 -2736.22 2736.74 271.11 14.66 MWD - 13 9843.00 84.50 313.50 30.00 8829.91 2733.52 72.42 -2758.73 2759.68 271.50 16.97 MWD - 14 9873.00 85.80 318.00 30.00 8832.45 2757.58 93.83 -2779.58 2781.17 271.93 15.56 MWD - 15 9903.00 86.40 318.60 30.00 8834.49 2780.88 116.18 -2799.49 2801.90 272.38 2.83 MWD - 16 9933.00 86.70 313.50 30.00 8836.29 2804.89 137.73 -2820.27 2823.63 272.80 17.00 MWD - 17 9978.00 88.70 302.80 45.00 8838.11 2844.26 165.46 -2855.58 2860.37 273.32 24.17 MWD - 18 10010.00 91.90 306.30 32.00 8837.94 2873.22 183.60 -2881.93 2887.77 273.65 14.82 MWD - 19 10062.00 94.80 312.30 52.00 8834.90 2918.19 216.46 -2922.08 2930.08 274.24 12.80 MWD - 20 10093.00 95.20 317.20 31.00 8832.19 2943.37 238.19 -2944.00 2953.62 274.63 15.80 MWD - 21 10157.00 96.70 312.30 64.00 8825.56 2995.27 283.00 -2989.19 3002.56 275.41 7.97 MWD - 22 10176.00 97.80 309.50 19.00 8823.16 3011.34 295.33 -3003.44 3017.92 275.62 15.72 MWD - 23 10204.00 96.60 308.10 28.00 8819.65 3035.54 312.74 -3025.08 3041.21 275.90 6.56 MWD - 24 10230.00 94.10 306.00 26.00 8817.22 3058.47 328.33 -3045.74 3063.39 276.15 12.53 MWD - 25 10254.00 91.10 306.70 24.00 8816.14 3079.84 342.54 -3065.05 3084.13 276.38 12.84 MWD - 26 10312.00 91.70 292.90 58.00 8814.71 3134.05 371.29 -3115.24 3137.29 276.80 23.81 MWD - 27 10333.00 91.90 289.30 21.00 8814.05 3154.60 378.85 -3134.82 3157.63 276.89 17.16 MWD - 28 10370.00 90.53 281.11 37.00 8813.27 3191.37 388.54 -3170.49 3194.21 276.99 22.44 SP - 29 10445.00 90.53 281.11 75.00 8812.57 3266.34 402.99 -3244.08 3269.01 277.08 Proj MWD - [(c)2001 Anadrill IDEAL ID6_1C_10]