Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-145
Oilfield Services
.
.
2525 Gambell Street
SUite 400
Anchorage, Alaska 99503
(90712731700
Fax (907) 561-8317
Schlumberger
August 28, 2006
Christine Mahnken
Alaska Oil & Gas
333 West 7th Avenue
Suite 100
Anchorage, AK 99501
(ìf' ~)
SCANNED SEP 1 9 2wdb
Dear Ms. Mahnken,
Enclosed please find CDs you returned to Schlumberger for being corrupted.
The CD for Well S-17B appears to be blank, and a replacement is enclosed.
There is nothing wrong with the other two CDs. I successfulJy opened the text files on
both CDs using WordPad. The Final.tif files on both CDs were successfully processed
with Schlumberger software into ASCII files, which show no sign of corruption.
However, a replacement CD for each has been furnished to you.
If you require further assistance reading these CDs, please contact:
Sincerely,
~
Dana Kostreba
Log Data Planning Coordinator
DK:dk
Encl: 3 original CDs: WelJs C-27B, NK-12C, and S-17B
3 replacement CDs for the above
(1 Jþl-I'-lS- ~ I05~3
'_ 1C í t-{ D') Ò
d03-65~
0ó-S-1fs(P tt 138/0
ANADRILL
SCHLUMBERGER
Survey report 17-Aug-2001 01:56:45 Page 1 of 2
Client...................: BP Exploration (Alaska) Inc.
Field....................: Prudhoe Bay Unit
Well.....................: S-17B Spud date................:
API number...............: 50-029-21148-02 Last survey date.........: 17-Aug-01
Engineer.................: M. Brown Total accepted surveys...: 29
MD of first survey.......: 9462.00 ft
COUNTY:..................: Nabors 3S / Dowell # 4 MD of last survey........: 10445.00 ft
STATE:...................: Alaska
----- Survey calculation methods------------- ----- Geomagnetic data ----------------------
Method for positions.....: Minimum curvature Magnetic model...........: BGGM version 2000
Method for DLS...........: Mason & Taylor Magnetic date............: 00-Y- 0
Magnetic field strength..: -999.25 HCNT
----- Depth reference ----------------------- Magnetic dec (+E/W-).....: -999.25 degrees
Permanent datum..........: Mean Sea Level Magnetic dip.............: -999.25 degrees
Depth reference..........: Gr Tiein 9260
GL above permanent.......: -50000.00 ft ----- MWD survey Reference Criteria ---------
KB above permanent.......: 67.50 ft Reference G..............: 1000.00 mGal
DF above permanent.......: -50000.00 ft Reference H..............: 1000.00 HCNT
Reference Dip............: 0.00 degrees
----- Vertical section origin---------------- Tolerance of G...........: (+/-) 2.50 mGal
Latitude (+N/S-).........: 0.00 ft Tolerance of H...........: (+/-) 6.00 HCNT
Departure (+E/W-)........: 0.00 ft Tolerance of Dip.........: (+/-) 0.45 degrees
----- Platform reference point--------------- ----- Corrections ---------------------------
Latitude (+N/S-).........: -999.25 ft Magnetic dec (+E/W-).....: -57252.81 degrees
Departure (+E/W-)........: -999.25 ft Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: -57252.81 degrees
Azimuth from rotary table to target: 279.40 degrees (Total az corr = magnetic dec - grid conv)
Sag applied (Y/N)........: No degree: 0.00
[(c)2001 Anadrill IDEAL ID6_1C_10]
ANADRILL SCHLUMBERGER Survey Report 17-Aug-2001 01:56:45 Page 2 of 2
=== ======== ====== ======= ====== ======== ======== ================ =============== ===== ===== ======
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
=== ======== ====== ======= ====== ======== ======== ================ =============== ===== ===== ======
1 9462.00 39.20 334.20 0.00 8670.25 2463.64 -158.75 -2523.45 2528.44 266.40 0.00 TIP -
2 9499.00 46.80 333.00 37.00 8697.29 2478.40 -136.17 -2534.68 2538.33 266.92 20.66 MWD -
3 9532.00 53.00 330.00 33.00 8718.54 2493.92 -114.02 -2546.74 2549.29 267.44 20.03 MWD -
4 9562.00 57.00 326.00 30.00 8735.75 2510.18 -93.20 -2559.77 2561.47 267.91 17.23 MWD -
5 9598.00 59.20 319.60 36.00 8754.79 2532.38 -68.89 -2578.25 2579.17 268.47 16.28 MWD -
6 9631.00 60.40 315.10 33.00 8771.39 2554.87 -47.93 -2597.57 2598.02 268.94 12.33 MWD -
7 9661.00 63.10 309.20 30.00 8785.60 2577.09 -30.22 -2617.16 2617.34 269.34 19.52 MWD -
8 9693.00 66.50 305.50 32.00 8799.23 2602.66 -12.67 -2640.18 2640.21 269.73 14.91 MWD -
9 9723.00 72.40 303.70 30.00 8809.75 2628.07 3.27 -2663.30 2663.30 270.07 20.45 MWD -
10 9753.00 77.90 302.00 30.00 8817.44 2654.66 18.99 -2687.65 2687.72 270.40 19.13 MWD -
11 9783.00 81.50 304.50 30.00 8822.80 2681.65 35.17 -2712.33 2712.55 270.74 14.53 MWD -
12 9813.00 83.40 308.50 30.00 8826.75 2708.12 52.86 -2736.22 2736.74 271.11 14.66 MWD -
13 9843.00 84.50 313.50 30.00 8829.91 2733.52 72.42 -2758.73 2759.68 271.50 16.97 MWD -
14 9873.00 85.80 318.00 30.00 8832.45 2757.58 93.83 -2779.58 2781.17 271.93 15.56 MWD -
15 9903.00 86.40 318.60 30.00 8834.49 2780.88 116.18 -2799.49 2801.90 272.38 2.83 MWD -
16 9933.00 86.70 313.50 30.00 8836.29 2804.89 137.73 -2820.27 2823.63 272.80 17.00 MWD -
17 9978.00 88.70 302.80 45.00 8838.11 2844.26 165.46 -2855.58 2860.37 273.32 24.17 MWD -
18 10010.00 91.90 306.30 32.00 8837.94 2873.22 183.60 -2881.93 2887.77 273.65 14.82 MWD -
19 10062.00 94.80 312.30 52.00 8834.90 2918.19 216.46 -2922.08 2930.08 274.24 12.80 MWD -
20 10093.00 95.20 317.20 31.00 8832.19 2943.37 238.19 -2944.00 2953.62 274.63 15.80 MWD -
21 10157.00 96.70 312.30 64.00 8825.56 2995.27 283.00 -2989.19 3002.56 275.41 7.97 MWD -
22 10176.00 97.80 309.50 19.00 8823.16 3011.34 295.33 -3003.44 3017.92 275.62 15.72 MWD -
23 10204.00 96.60 308.10 28.00 8819.65 3035.54 312.74 -3025.08 3041.21 275.90 6.56 MWD -
24 10230.00 94.10 306.00 26.00 8817.22 3058.47 328.33 -3045.74 3063.39 276.15 12.53 MWD -
25 10254.00 91.10 306.70 24.00 8816.14 3079.84 342.54 -3065.05 3084.13 276.38 12.84 MWD -
26 10312.00 91.70 292.90 58.00 8814.71 3134.05 371.29 -3115.24 3137.29 276.80 23.81 MWD -
27 10333.00 91.90 289.30 21.00 8814.05 3154.60 378.85 -3134.82 3157.63 276.89 17.16 MWD -
28 10370.00 90.53 281.11 37.00 8813.27 3191.37 388.54 -3170.49 3194.21 276.99 22.44 SP -
29 10445.00 90.53 281.11 75.00 8812.57 3266.34 402.99 -3244.08 3269.01 277.08 Proj MWD -
[(c)2001 Anadrill IDEAL ID6_1C_10]
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LascrFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc
(a /Yl,,^-_.~ ~ 0 ~
DATA SUBMITTAL COMPLIANCE REPORT
2/26/2004
Permit to Drill 2011450
Well Name/No. PRUDHOE BAY UNIT S-17B
MD
10445 .-
Completion Date 2/8/2002--
Completion Status
TVD
8882 .".,
-.------ --------- --------- ----- --------
-------------- ------------ -------..-------------
REQUIRED INFORMATION
Mud Log No
Samples No
------------------------ ---
Log Log Run Interval OH /
Scale Media No Start Stop CH Received Comments
------------- ------------------------------------------------------------------..--- -- -------"- - - --..- --------- - 00_- -"--ì
1 10216 10418 Open 12/7/2001
1 9451 10317 Open 6/20/2002
1 10215 10415 Open 12/7/2001
1 9451 10317 Open 6/20/2002 Well Bore Profile
1 9451 1 0317 Open 6/20/2002
9451 1 0317 Open 6/20/2002
9451 10317 Open 6/20/2002 Well Bore Profile
Open 10/4/2001 Directional Survey Digital
Data
--------------
--------~-----
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
__--_00-- -----------------.....--- ----------..--
-ro-- C ~573 <3~l1'lrDCiRay'
D ~932
,..ro573 ~maRay
~l11ma Ray
~¿'~~Œ:
25 8S
25 8M
25 8M
25 8M
25 8M
og
~
~
~
~
D~
- ,9J.rectional Survey
D
- - - -. --
- -. . - - - .. -
- .. .. - -
LlS,Verifiåatioh'.-_.
Vf6656S$eNôtê~>
Bt(ectional Survey
----.----..--------..----------------------...--------------------.--- --..-------...-----.....--- -- . '------"--------.-- .------- ------
-------------..------------..
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
ADDITIONAL INFORMATION
Well Cored? Y ¡~
Operator BP EXPLORATION (ALASKA) INC
Sjed ,~~,
API No. 50-029-21148-02-00
P&A
Current Status P&A
UIC N
- ----------'--'-------______00______---..--------
-----------.----------------------------------..----------_00___- ---..-- ----
Directional Survey
No
------------------
(data taken from Logs Portion of Master Well Data Maint)
(
1
FINAL
1
1
FINAL
9451
7875
1 0317 Open 6/20/2002
9429
Case 2/19/2002
Open 10/4/2001
coil flag
Directional Survey Paper
Copy
(
Received
Sample
Set
Number Comments
Chips Received? - Y I N
Daily History Received?
'Gs/ N
cÞ/N
Formation Tops
Analysis
Received?
~
----- - --.. ----..-- -----.------ - - ------.---------------------------"---------------"-'--..-------------------- -- ...----------------------.--.-------------------- _.------------.- ----"-------.-----.--.....----..-----------
.-- _...- . - -._-- - - - . ---- -- "-""'---'-.. -- - -- --. -..- ------... --------- -- '-------- ..----...--...-------------------------- -------------_..- .. - ------- - -----'--- -- -..
DATA SUBMITTAL COMPLIANCE REPORT
2/26/2004
Permit to Drill 2011450
Well Name/No. PRUDHOE BAY UNIT S-17B
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-21148-02-00
MD
10445
TVD 8882
Completion Date 2/8/2002
Completion Status
P&A
Current Status P&A
UIC N
Comments:
~omPliance ;:'viewed By: - -~
-----._---
Date: - / ~ ~ciJi::ð_-tj.. -------.-----
(
(
(
PLTIGGI1'-1G
,..
~
f
LOCATION CLEF_~L~CE REPORT
State of .i-_laska
~XÃ or:. . ~ C::NSr;xvA'I'ICN CCMMISSION
~ell ~ra!11e
::"rn ~o.I;VI-1 ~S-
:ease AD L~ d ~L
ú/C) :;;¿ II t..{ð~(j 0
B l1-~5 ~'I'7ß
\{Qt':'".,--O:-":..- """..... ,:,,': ~ Co' .:'.-':--' '\."-.0.
.--.-- ----- - - - ---.
:CCa.t:'CIl
Cper2.t:=
SP~ci: 1L.h.2 J
Abnd
Completed ~ I
\iÞ7
!Jat~ ,? . O~
~-O~,
U¡ ItS l{
~er: ~:ar7a~s - C:p8:
well head
Sfc C~q:
:'cnq C~q:
!.iner:
Rev:.ew t.::.e well =~le, and' comm.ent
~Qca:~cn C~earance:
0:2 (06 7
Well ~.ad ~~t of~: '
Marxer ~C8t cr plata:
Conclusions:
Cod.
!l
(
V', /
~ \¡? ~lÑ\ ~ ~igneci S /Y) cJ7( ClhV
~ ~Date ;}f ~¡¿ 02
"
.
"
(
(
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well
0 Oil 0 Gas 0 Suspended a Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2204' SNL, 712' EWL, SEC. 35, T12N, R12E, UM
At top of productive interval
2178' SNL, 18881 WEL, SEC. 34, T12N, R12E, UM
At total depth
1811' SNL, 2533' WEL, SEC. 34, T12N, R12E, UM
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 67.48' ADL 028258
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
8/6/2001 8/16/2001 2/8/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
10445 8882 FT 10445 8882 FT 0 Yes a No
22. Type Electric or Other Logs Run
MWD, GR, RES
23.
CASING
SIZE
20" X 30"
13-3/8"
9-518"
Classification of Service Well
: \';
:' "
7. Permit Number
201-145 301-250 & 302-014
8. API Number
50- 029-21148-02
9. Unit or Lease Name
Prudhoe Bay Unit
J~¡
, ..
"""""'!'I...~......,~,.....
1 O. Well Number
5-17B
11. Field and Pool
Prudhoe Bay Field 1 Prudhoe Bay Pool
15. Water depth, if offshore 16. No. of Completions
NI A MSL Zero
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1900' (Approx.)
WT. PER FT.
Insulated
72#
47#
26#
GRADE
Conductor
L-80
L-80
NT13Cr-80
ASING, liNER AND CEMENTING RECORD
ETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 110' 36" 8 cu ds Concrete
Surface 2663' 17-1/2" 3255 cu ft AS III, 465 cu ft AS II
Surface 8300' 12-1/4" 1935 cu ft Class 'G'
8035' 9450' 8-1/2" 51 cu ft Class 'G'
AMOUNT PULLED
7"
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
None
25. TUBING RECORD
SIZE DEPTH SET (MD)
4-1/2", 12.6#, NT13Cr80 8084'
PACKER SET (MD)
8002'
MD
TVD
MD
TVD
26.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
9475' Set Open Hole Whipstock
(Just above top of cut 2-7/8" Liner)
P&A with 26.5 Bbls Class 'G'
9450'
27.
Date First Production
Not on Production
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
NIA
PRODUCTION FOR
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
OIL-BBL
GAs-McF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
OIL-BBL
GAs-McF
WATER-BBL
OIL GRAVITy-API (CORR)
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Subm '0 hi. '
.\ -- ",", jj",~
No core samples were taken.
APP, 1 9 2002
Form 10-407 Rev. 07-01-80
Alaska Oil g, GLii; ;..,;):.¡I\,¡¡~i,S¡(h
AHc!'¡¡)raÎJ~:i:
r.,f
Submit In Duplicate
~"
i{
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOA, and time of each phase.
Sag River
9451'
8729'
Shublik
9499'
8765'
Sadlerochit I Zone 4
9670'
8857'
RE"'I""~I".W\/FD
.' ,"' [j
..\f ~.~ ~;j...,,~
" :¡. ~ \~- ".~
¡- ""' r"\ "" 0 ? M1 ?
.~~/¡...,í. ! "} ¡...\¡Vl.~
A1as!<a 011 & Gas Cons. CommiSsiOf¡
Anchorage
Summary of abandonment operations.
(Summary of failed drilling operations attached to 10-404 Dated 10/02101.)
32. J hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble Title Technical Assistant
31. List of Attachments:
Date 0
S-178
Well Number
201-145 301-250 & 302-014
Permit No. I A roval No.
Prepared By Name/Number:
Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut~ln, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
f (\ f I' I:
I: t. I,: (
r
I;
I
i:.......
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
7/30/2001
7/31/2001
8/1/2001
8/2/2001
(
(
Page 1 of 11
BP EXPLORATION
Operations Summary Report
8-17
S-17B
REENTER+COMPLETE
NABORS
NABORS 3S
From - To Hours Activity Code NPT
00:00 - 00:00
03:30 - 10:00
10:00 - 15:00
15:00 - 22:00
22:00 - 00:00
00:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 10:00
10:00 - 10:30
10:30 - 11 :30
11 :30 - 13:45
13:45 - 15:00
15:00 - 18:15
18:15 - 20:00
20:00 - 22:30
22:30 - 00:00
00:00 - 02:30
02:30 - 03:26
03:26 - 03:30
03:30 - 05:30
05:30 - 08:30
08:30 - 11 :00
11:00 -15:00
15:00 - 16:30
16:30 - 18:15
18:15 - 18:30
18:30 - 18:45
18:45-20:15
20:15 - 21:36
24.00
6.50 RIGU
5.00 RIGU P
7.00 RIGU P
2.00 RIGU P
3.00 RIGU P
1.00 BOPSUR P
1.00 BOPSUR P
5.00 BOPSUR P
0.50 BOPSUR N
1.00 BOPSUR N
2.25 BOPSUR P
1.25 BOPSUR P
3.25 BOPSUR P
1.75 BOPSUR N
2.50 BOPSUR N
1.50 BOPSUR P
2.50 BOPSUR P
0.93 BOPSUR P
0.07 KILL P
2.00 KILL P
3.00 KILL
2.50 KILL
4.00 KILL
1.50 KILL
1.75 KILL
0.25 KILL
0.25 KILL
1.50 KILL
1.35 KILL
Phase
P
P
PRE
PRE
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
SFAL DECOMP
HMAN DECOMP
DECOMP
DECOMP
DECOMP
SFAL DECOMP
SFAL DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
N
DPRB DECOMP
N
DPRB DECOMP
N
DPRB DECOMP
N
DPRB DECOMP
N
DPRB DECOMP
N
N
N
N
DPRB DECOMP
DPRB DECOMP
DPRB DECOMP
DPRB DECOMP
Start: 7/30/2001
Rig Release: 8/18/2001
Rig Number:
Spud Date: 8/6/1984
End: 8/18/2001
Description of Operations
Summer rig mods.
Nabors 3S rig arrived on'S' Pad at 03:30 hours. Spot rig and
pits.
RU. Accept rig 15:00 hrs 7/31/01.
NU BOPE. Take on KCL water.
Continue RU. Wait on DS and lubricator.
MIRU DS #4. Install riser.
Full body test on stack. No visual leaks.
Pull BPV. Set TWC. WHP = 550 psi.
PT BOPE.
Unable to get high pressure test on variable rams (2-3/8" test
jt).
Closed upper 2-3/8" PIS on 3-1/2" test sub. Replace and
retest rams.
Variables tested OK with 3-1/2" test sub. Continue with BOP
test.
Retest variables with 2-3/8" test joint. Good flat line. Continue
with choke manifold test.
Pinhole 2" HP choke flexline. Find replacement. Stab ROC.
Install CTC. Pull test.
Wait on choke line. NU to stack.
MU and PT BHA #1 (3" nzl, 3.375" disconnect, & 3.125"
checks). PT coil side from ROC to stack. Finish choke flexline
MU. Test new line.
Continue BOPE test.
Complete BOPE test..
Pull TWC.
Injector on well PT surface.
Rih w/ BHA#1w/ choke closed. SIWhp= 550 psig. At 1500'
find btm of gas head and begin circ kill taking returns to tiger
tank. Liquid to surface. PU Wt 39k @ 7000'. Continue circ in
hole to 7954'. No returns at 2.0 BPM circulating.
Fill hole across top of stack and monitor losses. Losing 120 -
140 BPH. Mix and pump 35 bbl pill of 3.5 ppb biozan. Circ to
end of coil, BH down to perfs, switch back to filling and monitor
losses. No improvement. Out of KCL.
SI well and wait on more KCL and high LSRV mud pill. WHP
up to 40 psi.
Fill hole across top again with KCL to check losses. Losses
still hanging in there at about 120 - 150 BPH losses. Wait on
mud (have to use KCL truck -- no other trucks available).
Circulate 300 bbls 150k LSRV Flo-Pro mud into well,
bullheading 2-7/8" liner volume to perfs. Circulating 3.0 BPM in
and 0.5 BPM out. No improvement in losses.
POOH for big hole nozzle. Mix MI seal, OM, and Mix II pill.
Losses slowing down while POOH. Park at 3800'. Check
returns 1.8 in; 0.5 out. Continue POOH. Never got new mud
back to surface.
Bump up. Close master.
Crew change safety meeting.
Change-out nozzle with big hole nozzle.
Stab back on. Fill hole and monitor static losses. Losses are
12 bbls per hour.
Printed: 10/2/2001 9:49:38 AM
('
(
BP EXPLORATION Page 2 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-17B Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/2/2001 21 :36 - 23:30 1.90 PULL P DECOMP Break off nzl. MU BHA#2 (liner fishing string).
23:30 - 00:00 0.50 PULL P DECOMP Rih wI BHA# 2(fishing string).
8/3/2001 00:00 - 01 :03 1.05 PULL P DECOMP Continue running in hole w/ BHA #3.
01:03 - 01:12 0.15 PULL P DECOMP PU wt. 42.5k. Latch top of cut liner @ 8046'. Pu1l6.5k over
and fire jars. Pull 12.5k over and fire jars. Liner is free.
01:12 - 02:45 1.55 PULL P DECOMP Pooh w/liner. Surface. Monitor for flow.
02:45 - 06:00 3.25 PULL P DECOMP Lay down fishing TS. Lay down 7 jts of 2-7/8" liner.
06:00 - 06:30 0.50 PULL P DECOMP Crew change safety meeting.
06:30 - 07:30 1.00 PULL P DECOMP Continue LD of 2-7/8" liner.
07:30 - 07:45 0.25 PULL P DECOMP BOP drill.
07:45 - 10:00 2.25 PULL P DECOMP Continue LD of 2-7/8" liner (Total 33 jts + 2 pups of 8rd; 1 XO
jt; 13 jts STL; 1 cut jt STL 19.5' long.) Clear floor of handling
tools. Check static losses -- about 5 bbls per hour.
10:00 - 12:30 2.50 STWHIP P PROD1 Unstab ROC. Restab E-line coil. RU for reversing (slack
management).
12:30 - 13:30 1.00 STWHIP P PROD1 Reverse at 3 BPM.
13:30 -14:30 1.00 STWHIP P PROD1 Pump forward.
14:30 - 15:45 1.25 STWHIP P PROD1 Oops. Forgot to rehead first. Reverse again, cut back pipe
(30'), rehead, pump forward.
15:45 - 17:30 1.75 STWHIP P PROD1 Head-up E-line CTC and tools.
17:30 -19:00 1.50 STWHIP P PROD1 MU open hole clean-out BHA #3 (1.5 deg motor; used DS49).
19:00 - 21:00 2.00 STWHIP P PROD1 Rih w/ BHA #3. No restrictions. No trouble thru old window
section from 9450-9456'. Between 30-45 bbls FLI Hr. Order
out more FLO-Pro.
21 :00 - 22:30 1.50 STWHIP P PROD1 Tie into Sperry-Sun Driling Services MWD dated 11-0CT-91.
Flag EOP @ 9216'.
22:30 - 00:00 1.50 STWHIP P PROD1 Pooh.
8/4/2001 00:00 - 00:30 0.50 STWHIP P PROD1 Continue POOH w/ BHA #3. Surface.
00:30 - 01:15 0.75 STWHIP P PROD1 LD BHA #3
01:15 - 02:00 0.75 STWHIP P PROD1 PU BHA #4 (OH Whipstock AL KO Plug/ BOT Mechanical
Release (28k)/& OXP).
02:00 - 02:30 0.50 STWHIP P PROD1 Function testing tools.
02:30 - 03:00 0.50 STWHIP N SFAL PROD1 Repeat tool testing. Inclinometer not working. However, will
not need that feature to set OH whipstock. Decide to RIH.
03:00 - 04:30 1.50 STWHIP P PROD1 RIH w/ BHA #4.
04:30 - 05:00 0.50 STWHIP N SFAL PROD1 Encoder broke @ surface. Standby for repair.
05:00 - 05:30 0.50 STWHIP P PROD1 Continue in the hole w/ BHA#4. Correct @ flag to 9293' (EOP
is 9216'+77' tools).
05:30 - 05:50 0.33 STWHIP P PROD1 Tie-in at 9260' GR spike. Correct depth (+3'). Circ sub
opens/closes slow.
05:50 - 06:15 0.42 STWHIP P PROD1 RIH to OH Plug Aluminum Kick off Plug setting depth.
Pressure up slowly on coil to 3200 psig. Set Top of Plug @
9475'. Set down 10k on plug--Good. PUH above window.
Circulate at 1.8 BPM. Full returns.
06:15-07:15 1.00 STWHIP N DFAL PROD1 Wait on circ sub to open. Something still wrong with it. Very
slow to open. Lost patience. Close it.
07:15 - 09:00 1.75 STWHIP P PROD1 POOH.
09:00 - 09:45 0.75 STWHIP P PROD1 LD whipstock setting tool.
09:45 - 11: 15 1.50 STWHIP N DFAL PROD1 PU different OXP and EDC and test tools.
11: 15 - 11 :45 0.50 STWHIP P PROD1 MU BHA #5 (2.7 deg motor; M09)
11 :45 - 13: 15 1.50 STWHIP P PROD1 RIH.
13:15 - 13:30 0.25 STWHIP P PROD1 Log tie-in at 9260' GR spike. Correct depth (-5').
13:30 - 15:15 1.75 STWHIP P PROD1 RIH and dry tag 9476'. Down ream from 9470' to billet at 50L,
Printed: 10/2/2001 9:49:38 AM
(
(
BP EXPLORATION Page 3 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-17B Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/4/2001 13:30 -15:15 1.75 S1WHIP P PROD1 0.5 FPM, 2.4/3400. Tag whipstock and mill-off 200 psi motor
work. Repeat downream. Continue milling down at about 0.3
FPM, 100 psi motor work to 9500'. Steady milling. Looks like
we're below anchor and in new hole. Back ream window twice.
Minimal motor work. Dry tag clean at 9500'
15:15 - 16:15 1.00 S1WHIP N STUC PROD1 PUH and could not get past 9445' (top of other window). Clean
SO. Open circ sub and circulate 3.0 BPM. Wash window. Still
can't get past. Pull to 18k over. Grabbed a little on SO. Close
circ sub. PUH at minimum rate. Stall. Attempt to work thru at
various TF's. Pulled thru clean with TF pointing straight down.
16:15 -18:15 2.00 S1WHIP P PROD1 POOH. Tools shorted-out at 9280'. Continue POOH.
18:15 -18:30 0.25 S1WHIP N DFAL PROD1 OOH. Find EDC had disconnected.
18:30 - 23:00 4.50 S1WHIP N DFAL PROD1 Call Baker. Unstab E-coil & stab Roc coil. Get fishing x-overs
together, etc.
23:00 - 00:00 1.00 S1WHIP N DFAL PROD1 MU BHA#6 (fishing string w/ 3" GS spear). MU CTC. Pull test
CTC to 30k. Start working on the next fishing spear. May need
to orient 180 to get past the old window with bit?
8/5/2001 00:00 - 01 :00 1.00 S1WHIP N DFAL PROD1 Finish MU and test of BHA #6, OXP fishing string.
01 :00 - 02:50 1.83 S1WHIP N DFAL PROD1 RIH w/ BHA #6.
02:50 - 03:20 0.50 S1WHIP N DFAL PROD1 PU wt 42k. Set down on fishing neck @ 9438' uncorrected
depth. PU weighing 46k. Puh to old window. Pull to 50k.
Stop. Rih. Puh at faster speed. Pull 55k. Slack off. Pull 60k.
Jars fired. Pooh w/2k over. (Fish on).
03:20 - 05:00 1.67 S1WHIP N DFAL PROD1 Pooh w/ fish. Slight overpull @ GLM station #3.
05:00 - 07:00 2.00 S1WHIP N DFAL PROD1 Breakdown fishing string. Retrieved all fish. LD tools. Bit OK
-- 2 small chips on gage cutters. Test OXP that was fished --
flaky. Have one OXP left.
07:00 - 08:00 1.00 S1WHIP N DFAL PROD1 Discuss game plan.
08:00 - 10:00 2.00 S1WHIP N DFAL PROD1 Unstab ROC. Stab E-line coil. Slack management -- reverse
circulate. Cut back 25' of coil.
10:00 -12:30 2.50 S1WHIP N DFAL PROD1 Rehead.
12:30 - 14:00 1.50 S1WHIP N DPRB PROD1 PT connector. MU BHA #7 (1.5 deg motor; string mill; DSM).
14:00 - 16:00 2.00 S1WHIP N DPRB PROD1 RIH. Sat down in #3 and #2 GLM's. Orient high side to get
thru.
16:00 -16:15 0.25 S1WHIP N DPRB PROD1 Log tie-in. Correct depth (-5').
16:15 -17:00 0.75 S1WHIP N DPRB PROD1 RIH. Stall at 9450' with highside TF. Try to work thru window
dry at different TF's. No go.
17:00 -18:00 1.00 S1WHIP N DPRB PROD1 Ease into it with pumps. Stall twice, then got steady milling for
about 1'. Mill to 9460'. Backream, no motor work. Make
another pass down. Minimal work down and up. RIH dry --
clean. Position TF at 60L. Clean thru window here, also. Did
not tag TD.
18:00 -18:30 0.50 S1WHIP N DFAL PROD1 PUH above window and reboot in attempt to get DWOB
working. Nope. "Measure unit" (uppermost portion of OXP
tool) bad. Just effects pressures and weight. No backup OXP.
18:30 - 20:00 1.50 S1WHIP N DFAL PROD1 POOH.
20:00 - 20:30 0.50 S1WHIP N DFAL PROD1 Surface. LD BHA#7.
20:30 - 21 :00 0.50 DRILL N DFAL PROD1 PU BHA#8 (3.75" DS49 PDC bit-serial #H47138/ Navidrill
Extreme motor w/1.6 deg bent sub).
21 :00 - 23:00 2.00 DRILL N DFAL PROD1 Rih w/ BHA #8.
23:00 - 23:30 0.50 DRILL N DFAL PROD1 Tie into Sperry Sun MWD dated 11-0CT-91(-13').
23:30 - 00:00 0.50 DRILL P PROD1 Dry tag @ 9482'. Can't get in. Repeat efforts dry. Nogo.
Printed: 10/2/2001 9:49:38 AM
t
\
BP EXPLORATION Page 4 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-17B Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/5/2001 23:30 - 00:00 0.50 DRILL P PROD1 Take a run at it with pumps. No go. Drill from 9482' with 50L
TF. Did not skip in. Starting new hole.
8/6/2001 00:00 - 03:00 3.00 DRILL P PROD1 Drill ahead from 9500 to 9509'. Stall. Backream to 9480'. Rih
and dry tag. FS motor is 3250 pisg @ 2.4 bpm. Grab sample
from 9550' (Grab samples every 50'). Drill ahead to 9601'.
03:00 - 03:15 0.25 DRILL P PROD1 Short trip minimum rate from 9601'-9525' for survey data
confirmation.
03:15 - 05:00 1.75 DRILL P PROD1 Drill ahead from 9601'-9618. ROP is 43 fph.
05:00 - 06:45 1.75 DRILL P PROD1 Depth-9675'. ROP is 50 fph. At 9700', into 24 w/ ROP up to
100 fph. Drill to 9800'.
06:45 - 07:15 0.50 DRILL P PROD1 Wiper trip to 9600'.
07:15 - 09:15 2.00 DRILL P PROD1 Drill to 9975'. OXP tools quit working.
09:15 - 10:00 0.75 DRILL N STUC PROD1 Drill to 9977' and got differentially stuck. Work pipe. Order
crude. Let relax for 15 minutes. Pull to 85k and pulled free.
10:00 -12:00 2.00 DRILL N DFAL PROD1 POOH for OXP. Clean through KO plug and window.
12:00 -13:30 1.50 DRILL N DFAL PROD1 Change-out OXP (to slope rebuild #1 of 2). Adjust motor to 1.4
deg. Add resistivity tool. Check tools. Can't read OXP from
computer (worked on ground but not in the air).
13:30 -15:00 1.50 DRILL N DFAL PROD1 Change-out OXP again (to slope rebuild #2). Check tools.
This OXP also has the "measuring unit" not working, just like
the tool we were drilling with before it quit completely. No other
rebuilds available.
15:00 -16:00 1.00 DRILL N DFAL PROD1 RIH. Tools shorted at 3500'. POOH.
16:00 - 18:00 2.00 DRILL N DFAL PROD1 Troubleshoot. Short is in USMPR. Swap to last available
USMPR.
18:00 - 19:00 1.00 DRILL N DFAL PROD1 RIH with BHA #10. Tools would not communicate @ 2300'.
19:00 - 19:40 0.67 DRILL N DFAL PROD1 POOH to trouble-shoot.
19:40 - 00:00 4.33 DRILL N DFAL PROD1 Trouble-shoot. Check communications w/ OXP. Problem
found from EDC back to unit. Check line from head back. Ok.
Change out drop connector. Check wet connect good.
Suspect line. Rehead (Using one of the outer conductors).
8/7/2001 00:00 - 03:30 3.50 DRILL N DFAL PROD1 BHI technicians completed rehead and still have
communications problems w/ tools below EDC. They function
properly when test sub is on, however will not communcate
when made up to coil. Take off resistiviy tool. No change.
Suspect the measuring sub in OXP, but no guarentees. Will
not have the new ones in until 1300 hrs. At 0330 hrs, no new
thoughts what is wrong--Time to make a change!!!
03:30 - 07:00 3.50 DRILL N DFAL PROD1 Mobilize MWD mud-pulse system equipment. BHI to continue
to work on tools.
07:00 - 12:00 5.00 DRILL N DFAL PROD1 Lay Down OXP equipment. Unstab e-line coil. Stab ROC. MU
MHA. Pull test. Spot MWD shack. Gather tools. Wait on
non-mag collar from tuboscope.
12:00 -15:00 3.00 DRILL N DFAL PROD1 Wait on tools.
15:00 -17:45 2.75 DRILL N DFAL PROD1 M/U BHA #9. ( MWD stabilizer OD larger than non-mag collar
ID by 1/16", ground down to fit) Surface test MWD and Res.
tool.
17:45 -19:00 1.25 DRILL N DFAL PROD1 TIH. Check tools 300'. Resistivity not looking good.
19:00 -19:50 0.83 DRILL N DFAL PROD1 Pooh to check resistivity.
19:50 - 21 :00 1.17 DRILL N DFAL PROD1 Test tools. Look good.
21:00-21:50 0.83 DRILL N DFAL PROD1 Rih to 2100'. Roc unit running high temperature.
21 :50 - 00:00 2.17 DRILL N SFAL PROD1 Stop and allow Roc unit to cool off. Call mechanics out to
Printed: 10/2/2001 9:49:38 AM
(
,
BP EXPLORATION Page 5 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-17B Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 35 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/712001 21 :50 - 00:00 2.17 DRILL N SFAL PROD1 repair fan clutch.
8/8/2001 00:00 - 01 :00 1.00 DRILL N SFAL PROD1 Mechanics arrive and repair fan clutch.
01 :00 - 02:00 1.00 DRILL N DFAL PROD1 Roc unit repaired Rih.
02:00 - 03:00 1.00 DRILL P PROD1 Tie in.
03:00 - 03:40 0.67 DRILL P PROD1 RIH tag bottom 9978'.
03:40 - 05:20 1.67 DRILL P PROD1 Orient 65L.
05:20 - 08:30 3.17 DRILL P PROD1 Drill horizontal ahead fl 9978' to 10104'. Survey results are not
consistent with TF orientation 120 degrees off. Also most of the
signals recieved from the resistivity tool are not being
processed by the computer at surface. This may be caused by
noise or some downhole tools problem.
08:30 - 11 :30 3.00 DRILL N HMAN PROD1 TOH to check TF and rebuild res. tool. Called AOGCC and will
do BOP test at this time.
11:30-12:15 0.75 DRILL N HMAN PROD1 UD BHA #11. TF out by 105 deg. Rebuilding MWD/Res tool.
12:15 -12:45 0.50 DRILL P PROD1 Set 2-way check and prep to test BOPE
12:45 - 13:45 1.00 DRILL P PROD1 Setback injector. Broken weld on injector. Welder to repair
while down for BOPE test.
13:45 - 20:30 6.75 DRILL P PROD1 Test BOPE. AOGCC inspector Lou Grimaldi on location.
20:30 - 22:30 2.00 DRILL P PROD1 Waiting on crew to pull 2-way check (currently on Doyon 14 at
S-Pad) Get ready to Pu BHA #12.
22:30 - 23:00 0.50 DRILL P PROD1 DSM pulling two-way check.
23:00 - 00:00 1.00 DRILL N HMAN PROD1 MU BHA#12.
8/9/2001 00:00 - 02:15 2.25 DRILL N HMAN PROD1 Continue MU of BHA#12. (Break down Resistivity Tool and
replace spring conductors--Hard time breaking sub,
overtorqued). Finish MU.
02:15 - 03:00 0.75 DRILL N HMAN PROD1 Test tools on surface. Good--Iooks better than yesterday.
03:00 - 03:30 0.50 DRILL N HMAN PROD1 RI H to 400' for tool test.
03:30 - 04:00 0.50 DRILL N HMAN PROD1 Tools function test ok.
04:00 - 05:30 1.50 DRILL N HMAN PROD1 RIH
05:30 - 09:55 4.42 DRILL N HMAN PROD1 Tie-in at 9450' without success. Will try at 9260'. Weak pulses
from the MWD « 5 psi when 50-100 psi normal) and orienter
not responding. Moving up hole to upper tie-in point. Starting to
get responce from orienter but pulses still weak from MWD.
Cleaned out transducer on standpipe and checked surface
cables for any moisture (rained lastnight) but nothing found.
Still very weak pulses. Will trip for new pulser/MWD and
replace orienter.
09:55 - 12:00 2.08 DRILL N DFAL PROD1 TOH for MWD pulsar.
12:00 -12:45 0.75 DRILL N DFAL PROD1 UD BHA and surface test orienter. Seems fine click for click.
12:45 -13:30 0.75 DRILL N DFAL PROD1 P/U new orienter and surface test-ok. Dump MPR memory
data. Could not communicate with MPR.
13:30 -16:30 3.00 DRILL N DFAL PROD1 Wait on new MWD parts. (delay at Kuparuk bridge)
16:30 -19:10 2.67 DRILL N DFAL PROD1 Make repairs to MWD tools. P/U BHA#13 (80.21'). Calibrate
and surface test MWD-ok.
19:10 -19:20 0.17 DRILL N DFAL PROD1 Stab on injector.
19:20 -19:30 0.17 DRILL N DFAL PROD1 RIHt0411'.
19:30 -19:45 0.25 DRILL N DFAL PROD1 Shallow test MWD
19:45 - 21:20 1.58 DRILL N DFAL PROD1 Rih to tie-in point.
21:20 - 21:50 0.50 DRILL N DFAL PROD1 Tie-in @ the 9260'(-8') spot.
21 :50 - 22:30 0.67 DRILL N DFAL PROD1 Rih and tag btm @ 10104.6'.
22:30 - 00:00 1.50 DRILL N DFAL PROD1 Start to orient wI goal of TF 90L. Orienter didn't respond on
first two series of attempts. Finally starting to get response.
Printed: 10/2/2001 9:49:38 AM
('
(
BP EXPLORATION Page 6 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-17B Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/912001 22:30 - 00:00 1.50 DRILL N DFAL PROD1 Orient 65L. Wait and see what reactive we have.
8/10/2001 00:00 - 02:15 2.25 DRILL P PROD1 Drill from 10104.6' at 90L. Relying on reactive torque to bring
toolface to 90L. Stall 10106'. ROP is - 40 fph. Drill ahead.
02:15 - 03:20 1.08 DRILL P PROD1 At 10188'. Lost reactive torque. Orient. Grab 10150' sample.
(Fluid loss 8 bbls/2hrs). PU wt 43k off btm.
03:20 - 04:30 1.17 DRILL P PROD1 FS @ 2.5 bpm is 3500 psig. SOW is 20k. WOB 4-5k. Drill
ahead wI 320 psig motor work. Losses still 4 bbll hr. Drill down
to 10253'. Losses up to 1 bpm. Call MI for Mud. Monitor
losses. Losses @ 50 bph- steady. Find 13/16" ball.
04:30 - 05:15 0.75 DRILL N DPRB PROD1 Wiper trip complete. Pull up to liner. Aggetate previously
mixed pill (8sks MI seal, 24 sks OM seal, & 18 sks Mix II in 35
bbls pill) .
05:15 - 08:15 3.00 DRILL N DPRB PROD1 Short injectivity test. Pump 5 bbls @ 0.7 bpm wI 450 psig.
.Circulate and monitor loss. Losses are down to 30 bph.
Perfom 2nd injectivity test 5 bbls 0.7 bpm wI 450 psig.
Launch 13/16" ball to open circ-sub. Open circ sub pump and
lay-in 32 bbl LCM pill. Close annulus and squeeze 3-4 bbls
LCM pill to formation .4 bpm at 550 psi max. Unable to
squeeze away more without going higher on pressures. (Total
pit volume 88 bbls) Appears that we drilled into the fault
starting around 10090'. DD was having trouble maintaining TF
with frequent motor stalls. Also having problems turning left to
stay within the polygon and at the same drill through the fault
zone rather than along the strike.
08:15 - 09:45 1.50 DRILL N DPRB PROD1 TOH to reset circ-sub and adjust motor setting.
09:45 - 10:00 0.25 DRILL N DPRB PROD1 Setback injector.
10:00 -10:45 0.75 DRILL N DPRB PROD1 Reset circ-sub and adjust motor from 1.37 to 1.60 change out
MHA.
10:45 - 11 :00 0.25 DRILL N DPRB PROD1 Stab-on injector
11 :00 - 13:00 2.00 DRILL N DPRB PROD1 TIH to 430' and surface test MWD - ok. Continue TIH
13:00 - 16:00 3.00 DRILL N DFAL PROD1 Log tie-in. Receiving strong pulses from MWD but then loose
all pulses until we cycle the pump again. Continue pumping
and try to get in snych with signals we are receiving. We did
successfully tie-in at 9260' no correction.
16:00 -17:00 1.00 DRILL N DFAL PROD1 MWD signals still fading out. Pumped 15 bbls KCL water to
flush pulsar and seems to have helped.
17:00 -17:15 0.25 DRILL N DPRB PROD1 TIH and tag at 9619'.
17:15 -17:45 0.50 DRILL N DPRB PROD1 Pull up hole and orient to 60L. Getting 15 deg/click.
17:45 -18:00 0.25 DRILL N DPRB PROD1 Rih to 9690'.
18:00 - 20:10 2.17 DRILL N DPRB PROD1 Orient 40L.
20:10 - 21:25 1.25 DRILL N DPRB PROD1 Tag down 9694'. Make it past. Tag down 9742' and orient to
get past. Tag down at 9763'. Work past. Tag btm @ 10254'.
21 :25 - 23:30 2.08 DRILL N DFAL PROD1 Having trouble wI orienter. Getting 1 for 6 clicks. Trying to get
from right side to left side. Get weak pulse again.
23:30 - 00:00 0.50 DRILL N DFAL PROD1 Mud swap. Pulses good as new mud reaches bit.
8/11/2001 00:00 - 01 :30 1.50 DRILL N DFAL PROD1 Attempting to Orient to 85L. Difficulties getting clicks. Pull up
hole to 9970', where this orinter will click.
01 :30 - 02:30 1.00 DRILL P PROD1 Drill ahead to 10274' with TF of 85L. TF kept slipping to 120L.
Keep giving it one more click. Getting good click. But can't
keep the TF.
02:30 - 04:35 2.08 DRILL N DFAL PROD1 Pulser became week and intermittent. Finally pulser quit.
Pump 3 bbls KCL water throught toolstring. No improvement.
Drilled from 10274' to 10276' before pulser quit totally.
Printed: 10/2/2001 9:49:38 AM
("
(
BP EXPLORATION Page 7 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-17B Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/11/2001 04:35 - 06:30 1.92 DRILL N DFAL PROD1 PUH into casing. Circulate. No pulses. POOH to check pulser
and orienter.
06:30 - 12:30 6.00 DRILL N DFAL PROD1 UD BHA. (MPR tools would not break down properly. A "crush
ring" - used to hold inner tools in place - was crushed to far and
prevented normal separation of tools while in the table. Layed
out entire tool string and seperated tools. Pulser pluged with
LCM.
12:30 - 16:00 3.50 DRILL N DPRB PROD1 Decided to RIH without MPR tool and only GR tools. Spare GR
tool failed to surface test. Download memory from MPR tool.
Will RIH with reslgr tools and new pulser again. May have
problem again with crush ring but no other backup tools on the
Slope. - new pulser failed surface test. wo pulser from CDR rig.
(Charter flight coming in tonight with new GR tool and misc
parts) (Anadrill moblizing and could start up by Monday)
16:00 - 22:20 6.33 DRILL N DPRB PROD1 Wait on tools from CDR. Finally, luck turning our way. Found
faulty "new" battery pack. Wiper plug coming to pig coil for
stray LCM. BHI still checking out tools and waiting on gamma
ray.
22:20 - 23:00 0.67 DRILL N DPRB PROD1 Pump dart through the roc coil. Small quantity of LCM and
piece of rubber recovered off shakers. MWD still checking out
tools.
23:00 - 00:00 1.00 DRILL N DPRB PROD1 Reverse mud out of e-line coil while waiting for tools.
8/12/2001 00:00 - 00:45 0.75 DRILL N DFAL PROD1 Finish reversing mud out of e-line coil.
00:45 - 01 :30 0.75 DRILL N DFAL PROD1 Dowell ET working on Nabors pump rate display to coil ops
cab. Gamma Ray tool on location. MWD testing tools before
make up.
01 :30 - 02:30 1.00 DRILL N DFAL PROD1 MU BHA #15 (GR, Weatherford Orienter, same 3.75" PDC
bit.....No resistivity). Test on surface. Good.
02:30 - 03:00 0.50 DRILL N DFAL PROD1 RIH to 402'. Function test tools- pulses good.
03:00 - 04:20 1.33 DRILL N DFAL PROD1 RIH wI BHA #15.
04:20 - 05:00 0.67 DRILL N DPRB PROD1 At 9385'. POH to 4.5" IT pumping 2.5 bpm to chase LCM out
of 7".
05:00 - 05:10 0.17 DRILL N DFAL PROD1 RIH to logging depth of 9260'. Take on 100 bbls new mud.
05:10 - 06:00 0.83 DRILL N DFAL PROD1 Log. Tied-in (-7').
06:00 - 06:30 0.50 DRILL N DFAL PROD1 RIH to bottom - no problems with hole.
06:30 - 07:15 0.75 DRILL P PROD1 Orienting to 60-90R.
07:15 - 10:15 3.00 DRILL P PROD1 Directionally drilling ahead f/1 0276' to 10299'. 2.6 I 2.5 taking it
slow to drill through fault zone and establish LH turn away from
polygon hardline. Very slow Prate.
10:15-11:05 0.83 DRILL P PROD1 Wiper trip to 9600'.
11:05 -14:30 3.42 DRILL P PROD1 Drill f/10299' to 10317'. Struggling to drill ahead, good
differential presssure 400+ psi but not drilling off. Finally drilling
after playing with it but P rate slow. Good sand 20-25 API zone
4 sands should drill faster. Seeing small amount of stator
rubber across shaker but still have good diff. pressure. Losses
to hole avg 5-6 bbl/hr
14:30 - 17:00 2.50 DRILL N DPRB PROD1 TOH to inspect BHA and bit.
17:00 - 18:00 1.00 DRILL N DPRB PROD1 Change out motor and bit.
18:00 - 20:30 2.50 DRILL N DPRB PROD1 RIH wI BHA #16.
20:30 - 21 :00 0.50 DRILL N DFAL PROD1 Attempt to tie-in. Lost GR. Still have pulser and orientation
pkg.
21 :00 - 23:15 2.25 DRILL N DFAL PROD1 POOH for new GR.
23:15 - 00:00 0.75 DRILL N DFAL PROD1 Change out GR.
Printed: 10/2/2001 9:49:38 AM
f
('"
\
BP EXPLORATION Page 8 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-178 Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/13/2001 00:00 - 00:30 0.50 DRILL N DFAL PROD1 Continue MU BHA #17(same as BHA#16, wI different GR).
Shallow test- good.
00:30 - 02:20 1.83 DRILL N DFAL PROD1 RIH wI BHA #17. At logging depth 9265'. Come on line for
logging pass. GR not working, again. GR locked, DAS sending
same number.
02:20 - 04:50 2.50 DRILL N DFAL PROD1 POOH. Test tools @ 5000'. Stop at 500' for shallow test. No
Good.
04:50 - 06:00 1.17 DRILL N DFAL PROD1 LD BHI. PU Anadrill.
06:00 - 13:00 7.00 DRILL N DFAL PROD1 Rigging up Anadrill surface equipment. Blind rams closed circ
across wellbore hole taking 3-4 bbllhr.
13:00 -13:20 0.33 DRILL N DFAL PROD1 PJSM wI Anadrill and all hands concerning plu of BHA and 3S
working practices.
13:20 - 15:30 2.17 DRILL N DFAL PROD1 M/U BHA #18.
15:30 -16:00 0.50 DRILL N DFAL PROD1 P/U injector.
16:00 - 19:30 3.50 DRILL N DFAL PROD1 RIH to 400' shallow test tools -ok (waiting on depth encoder)
continue RIH to 3500'. Test survey tools and orienter - ok.
Install depth encoder to injector. Continue RIH
19:30-21:15 1.75 DRILL N DFAL PROD1 Tie-in (-11').
21:15-21:35 0.33 DRILL N DFAL PROD1 RTIH to bottom. No problems with hole.
21 :35 - 00:00 2.42 DRILL N DFAL PROD1 Mad pass from 10313' to 10263'. On mad pass surveys are off
22 deg azi.
8/14/2001 00:00 - 02:00 2.00 DRILL N DFAL PROD1 Perform surveys through out OH. There is on average 21 deg
difference between BHI & Anadrill azi. Anadrill has magnetic
interference on several of surveys in build section (Will need to
space geo pkg further from motor-swap wI GR and also need
to reprogram tool for better data quality).
02:00 - 04:30 2.50 DRILL N DFAL PROD1 POH for tool change.
04:30 - 06:45 2.25 DRILL N DFAL PROD1 Change out faulty magnetometer and reconfigure survey tools.
Move directional portion of survey tools above GR to get away
from possible interference from motor. Re-program survey
tools to give better data quality at surface.
06:45 - 07:05 0.33 DRILL N DFAL PROD1 Stab-on injector.
07:05 - 09:15 2.17 DRILL N DFAL PROD1 TIH to 400' shallow test - ok RIH to 9250'.
09:15 - 10:10 0.92 DRILL N DFAL PROD1 Log tie-in -11' correction.
10:10 - 10:45 0.58 DRILL N DFAL PROD1 TIH to bottom no problems.
10:45 -11:00 0.25 DRILL N DFAL PROD1 Survey on bottom. Correlates good with BHI surveys.
11 :00 - 12:40 1.67 DRILL N DFAL PROD1 Log MAD pass to tie-in with BHllogs f/10214'
12:40 - 14:05 1.42 DRILL P PROD1 Directionally drill f/1 0317' 2.5/2.4, 85'/hr 90L TF. Lost total
returns at 10,389'. Drilled on to 10,396'. Zero returns.
14:05 -15:15 1.17 DRILL N DPRB PROD1 Trip into casing to 9400'. Mixing 30 LCM pill ( 12ppb OM Seal,
15ppb Mix II med, 7ppb MI Seal fine). Ordered 300 bbl mud
ETA 3 hrs.
15:15 -16:20 1.08 DRILL N DPRB PROD1 RIH to 10,000' lay-in 30 bbl LCM pill 1: 1 pull to safety at 8400'.
16:20 - 19:00 2.67 DRILL N DPRB PROD1 Circulate 1.6 11.4 surface volume 55 bbls wait on new mud
(arrive 1900 hrs)
19:00 - 20:45 1.75 DRILL N DPRB PROD1 Circulate min rate. Fill mud tanks and mix a 33 bbl LCM pill (5
ppb MI seal med, 7 ppb of OM seal, 15 ppb of Mix II med, 15
ppb of Mix II fine).
20:45 - 21 :00 0.25 DRILL N DPRB PROD1 Pre-job safety meeting prior to circulating pill.
21:00-21:15 0.25 DRILL N DPRB PROD1 Start pumping 33 barrel pill into coil. Coil volume is 60.1 bbls.
After pumping the 33 barrel pill plus 17.8 barrels of flo-pro
displacement the coil pressure increased to 3800 psi (pill still
9.3 bbls from end of coil). Bled off coil pressure and slowly
Printed: 10/2/2001 9:49:38 AM
(
'(
BP EXPLORATION Page 9 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-17B Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/14/2001 21:00-21:15 0.25 DRILL N DPRB PROD1 brought pressure back up to +1- 4200 psi several times but
could not dislodge the plug. Tried surging the coil to +/- 4200
psi several times and then bleeding off without successfully
unplugging the coil.
21:15 - 00:00 2.75 DRILL N DPRB PROD1 Start out of hole with coil and BHA.
8/15/2001 00:00 - 00:05 0.08 DRILL N DPRB PROD1 Pre-job safety meeting prior to laying down BHA.
00:05 - 02:00 1.92 DRILL N DPRB PROD1 Lay-down BHA. Found the bit, motor, and orienter plugged with
LCM material.
02:00 - 02:45 0.75 DRILL N DPRB PROD1 Circulate the LCM laden mud from the coil back to the pill pit.
02:45 - 02:50 0.08 DRILL N DPRB PROD1 Make up new BHA consisting of a nozzle, check assy., and coil
connector. Prepare to run into hole.
02:50 - 06:00 3.17 DRILL N DPRB PROD1 RIH with nozzle assy. tagged at 9484' (uncorrected) unable to
work past, could be top of whipstock. Pull up to 9400'.
06:00 - 07:00 1.00 DRILL N DPRB PROD1 Lay-in 33 bbl LCM pill 1:1 Pull up to 8400'.
07:00 - 08:15 1.25 DRILL N DPRB PROD1 Close choke squeeze away 30 bbl @ 1 bpm. Pressures 525 psi
at start to max of 860 psi at 27 bbls away. Final 810 psi at 30
bbls away. Open choke circulate 15 min. rate: 2.2 in 11.8 out.
08: 15 - 11 :00 2.75 DRILL N DPRB PROD1 TOH.
11:00-11:15 0.25 DRILL N DPRB PROD1 PJSM discuss plu BHA and review drlg plans.
11:15-12:30 1.25 DRILL N DPRB PROD1 Change out MHA. (received new mud) P/U BHA #19 surface
test orienter. Same time circ coil with new mud.
12:30 - 14:45 2.25 DRILL N DPRB PROD1 RIH to 450' shallow test MWD - ok. Continue RIH to 9265',
14:45 -15:15 0.50 DRILL N DPRB PROD1 Log tie-in after pumping 10 min BHA packed off. Tried to work
plugged BHA with no luck.
15:15 -16:45 1.50 DRILL N DPRB PROD1 TOH. (Will plan to pig coil while on surface. Gunning pits and
running over shakers while TOH. UD WE orienter and p/u
Sperry)
16:45 - 18:15 1.50 DRILL N DPRB PROD1 Lay down BHA. Found LCM plugged in the orienter.
18:15 - 20:00 1.75 DRILL N DPRB PROD1 Hold PJSM. Circulate one coil volume of new Flo-Pro mud
through coil, followed by a coil dart and one more coil volume
of new mud.
Very little LCM recovered from the coil.
20:00 - 21 :45 1.75 DRILL N DPRB PROD1 Assemble new BHA onto coil. Surface test orienter.
21 :45 - 22:30 0.75 DRILL N DPRB PROD1 RIH with coil and BHA. Circulate through BHA at minimum rate
while running in hole. Performed shallow MWD test at 400'.
Test ok.
22:30 - 23:10 0.67 DRILL N DPRB PROD1 Stop RIH in order to tear into mud pumps to investigate
knocking noise (did not want to RIH while not circulating).
Found an elasomer from the mud pumps valve seat out of
place.
23:10 - 00:00 0.83 DRILL N DPRB PROD1 Continue to RIH with coil and BHA while circulating at
mininimum rate.
8/16/2001 00:00 - 00:40 0.67 DRILL N DPRB PROD1 Wait on Nabors to repair mud pump motor #1. Motor will not
start. Rig up Dowell pump and start circulating and resume
running in hole with coil.
00:40 - 02:00 1.33 DRILL N DPRB PROD1 Continue to RIH with BHA and coil while circulating at 0.4 bpm
at 860 psi.
02:00 - 03:00 1.00 DRILL N DPRB PROD1 Stop at 9275' MD with bit. Increase pump rate to 2 BPM and
log down at 60 ft. per hour with the gamma ray to correlate
depth. At an injection rate of 2 BPM the return rate was 1.2
BPM (0.8 BPM loss to the formation). Subtract off 10' from coil
tubing measured depth to put on depth with the open hole log.
03:00 - 04:00 1.00 DRILL N DPRB PROD1 Orient tool face to 90 L. Had difficult time getting orientation
Printed: 10/2/2001 9:49:38 AM
('
~:'
BP EXPLORATION Page 10 of 11
Operations Summary Report
Legal Well Name: S-17
Common Well Name: S-17B Spud Date: 8/6/1984
Event Name: REENTER+COMPLETE Start: 7/30/2001 End: 8/18/2001
Contractor Name: NABORS Rig Release: 8/18/2001
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
8/16/2001 03:00 - 04:00 1.00 DRILL N DPRB PROD1 due to hole taking fluid at rates of 0.8 to 1.0 BPM
04:00 - 04:30 0.50 DRILL N DPRB PROD1 Stacked weight on the bit when running in hole at 10,318'.
Picked up bit to 10,310' and increased pump rate to 2.5 BPM
in order to torque up on the BHA to orient it to 90 L (same
orientatation as the toolface when the hole was drilled). Losses
dropped to approximately 0.4 BPM.
04:30 - 04:35 0.08 DRILL N DPRB PROD1 Continue in hole. Free spin appears to be 3450 psi at 2.5 BPM.
04:35 - 05:00 0.42 DRILL P PROD1 On bottom at 10,396. Start drilling new hole at pump rate of 2.5
BPM at 3600 psi and a return rate of 1.4 - 1.8 BPM. Drilled to
10413'. returns down to 25% or less.
05:00 - 06:45 1.75 DRILL P PROD1 Orienting. Having hard time getting clicks. Circulate across
topof hole and finally get the 1 click we are looking for. Returns
from 25% to 0%.
06:45 - 08:00 1.25 DRILL P PROD1 Drill f/1 0413' to 10445'. No returns. Mixed through the hopper
3 sks MI seal II (ground peanut hulls) and 2 sks MI seal Med
(cedar fiber & cello-flake) at 5min/sk. Plugged the BHA.
08:00 - 09:00 1.00 DRILL N DPRB PROD1 Pull uphole into casing trying to unplug BHA. Getting some
movement at high pressures but just packing off worse.
09:00 - 12:30 3.50 DRILL N DPRB PROD1 TOH. Check BHA componets individually found small amount
of LCM ( less than half the size of a golfball) on top of bleed
sub. Thats it nothing else. Pumped through orienter and motor,
no blockage.
12:30 - 12:45 0.25 DRILL N DPRB PROD1 LID tools.
12:45 - 13:00 0.25 DRILL P PROD1 Install TWC. (Called AOGCC for BOP test witnessing wavied
by John Crisp)
13:00 - 18:00 5.00 DRILL P PROD1 Test BOPE. Circulate coil to pits. Circulate pits shake out any
LCM.
18:00 - 20:15 2.25 DRILL P PROD1 Waiting on valve crew - stuck at bridge. Pump dart through coil.
20:15 - 20:30 0.25 DRILL N DPRB PROD1 PJSM to discuss circulating the hole full of mud and setting the
Weatherford openhole whipstock.
20:30 - 21 :50 1.33 DRILL N DPRB PROD1 MU nozzle onto MHA and RIH to 4000'. Fill hole with flo-pro
mud. Circulated mud into the hole and took returns for 10
minutes. Final pump rate was 2.5 BPM at 2,150 psi., returns
recorded at 1.5 BPM.
21 :50 - 23:45 1.92 DRILL N DPRB PROD1 POOH with nozzle and MHA. LD. MHA.
23:45 - 00:00 0.25 DRILL N DPRB PROD1 MU BHA consisting of Weatherford ¡Alpha openhole whipstock
(3.5" OD, 14.78' long). Alpha setting tool (1/2" ball set) and
MHA.
8117/2001 00:00 - 02:15 2.25 DRILL N DPRB PROD1 RIH with Weatherford OH whipstock. RIH to 7748' CTD and
stack out. Pick up and set down five times but could not work
past.
02:15 - 04:15 2.00 DRILL N DFAL PROD1 POOH with Weatherford OH whipstock setting tool. The
whipstock has prematurely set with the top at 7733.22'. Lay
down Setting tool.
Weatherford OH Whipstock:
top aluminum billet 7733.2' md
bottom of aluminum section 7743.5' md
middle of slips 7744.9' md
bottom. of anchor (packer) 7748' md
04:15 - 06:00 1.75 DRILL N DFAL PROD1 Discussed whipstock setting with town engineers. Plan forward
is to RDMO.
06:00 - 08:00 2.00 DRILL N DFAL PROD1 P/U nozzle and RIH to 2500'. Lay-in 38 bbls crude 1: 1 to
Printed: 10/2/2001 9:49:38 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
(
(
Page 11 of 11
BP EXPLORATION
Operations Summary Report
S-17
S-17B
REENTER+COMPLETE
NABORS
NABORS 38
Start: 7/30/2001
Rig Release: 8/18/2001
Rig Number:
Spud Date: 8/6/1984
End: 8/18/2001
From - To Hours Activity Code NPT
Description of Operations
8/17/2001
06:00 - 08:00
08:00 - 08:30
08:30 - 00:00
00:00 - 06:00
8/18/2001
2.00 DRILL
0.50 DRILL
15.50 DRILL
6.00 DRILL
N
N
N
P
Phase
DFAL PROD1
DFAL PROD1
DFAL PROD1
PROD1
surface.
Install BPV in tubing hanger.
Begin rig-down operations.
Rig Down Nabors 3S. Tested tree cap to 3,500 psi. Clean mud
tanks.
Dowell CTU #4 left location yesterday evening for Deadhorse
to be respooled with new 2 3/8" coil (without e-line).
Rig released at 0600 hrs 08-18-2001. Rig on Stand-by.
Smaller loads moving out to DS #1 this AM. Larger heavier
loads to move AFTER the OK is given by PD&C onsite
engineer. Will cross the bridge on north lane. Recently poured
cement needs to harden to 4000 psi comp strength. Weather
dependant mainly temps will govern the cure times. Yesterday
PM it was 3200 psi. Tentitive move start time is 1800 hrs.
Printed: 10/2/2001 9:49:38 AM
Well:
Field:
API:
Permit:
-----------
(
-{
07/31/01
08/05/01
08/18/01
Nabors 3S
...--------...-------------
08/28/01
Move in and rig up. Pick up wash nozzle and fishing BHA. Run in hole, tag fish at 7743' ctmd.
Circulate and wash top of fish with KCL water. Pull out of hole, pick up overshot and run in hole. Make
several unsuccessful attempts to latch fish. Pull out of hole and found spear damaged. Make up same
wash nozzle with six tattle tails. Run in hole, tag fish pumping. Shut down pump, pull out of hole. All
pins showed engagement on fishing neck. Make up repaired overshot and run in hole.
S-17B (Ops SID)
Prudhoe Bay Unit
50-029-21148-02
201-145
Rig Accept:
Rig Spud:
Rig Release:
0 r i iii n g..£!!g :
08/29/01
Tag fish at 7736', jar up four times. Pull out of hole, remove fishing string. Whipstock is missing two
rubber elements. Freeze protect. Rig down and move off.
-------.-----..-
---.-------------...--------.-------..
POST RIG WORK
..
{
~,
--
Well:
Field:
API:
Permit:
S-17C
Prudhoe Bay Unite
50-029-21148-03
202-007
Rig Accept:
Rig Spud:
Rig Release:
Drill i n 9..!!!1f
02/14/02
02/16/02
03/02/02
Nabors 3S
"
PRE-RIG WORK
01/20/02
DRIFT TUBING WI 3.625 DUMMY WHIPSTOCK.
01/21/02
DRIFT TUBING WI 3.65" DUMMY WHIPSTOCK TO 9435' WLM. LEFT WELL SHUT IN.
01/27/02
MITIA PASSED TO 3000 PSI.
02/07/02
PRESSURE TEST SURFACE EQUIPMENT. PERFORM WEEKLY BOP TEST. MU AND RIH WITH PDS
MEMORY GR/CCL.
02/08102
RIH WITH MEMORY LOG TO 9410' CTMD. FLAG PIPE. POH AND LOG TO 7850'. FLAG PIPE. POH. VERIFY
DATA. GOOD. MU AND RIH WITH 2 7/8" MOTOR, JARS AND 3.80" MILL. RIH. CORRECT AT FLAG, TAG OPEN
HOLE KICKOFF TOOL AT 9467' (DN), 9462' (UP). POH. PU 3" COMBO NOZZLE. RIH. COOL DOWN @ 9000'
WHILE MIXING CEMENT. INJECTIVITY: 0.8 BPM AT 180 PSI. LAY IN 26.5 BBLS 17 PPG CEMENT FROM 9460'
TO 9138'. LOST 14 BBLS TO OH WHILE LAYING IN. PULL TO SAFETY AND HESITATE SQUEEZE. UNABLE
TO MAINTAIN WHP ABOVE 250 PSI. CEMENT TOP AT APPROXIMATELY 9350'. POH. DID NOT CIRCULATE
OUT DUE TO LOW SQUEEZE PRESSURE. FREEZE PROTECT COIL AND PRODUCTION TUBING WITH
MEOH. RDMO. NOTIFY PAD OPERATOR THAT WELL IS TO BE LEFT SI.
02/10/02
DRIFT W/3.25 CENT & SAMPLE BAILER. TAG CEMENT @ 9253' WLM (9284' CORRECTED). SAMPLE OF
CEMENT. PRESSURE TUBING TO 1000# PSI TO TEST CEMENT. MONITOR FOR 30 MIN. GOOD TEST.
RDMO. LEFT WELL SHUT IN. NOTIFIED PAD OPER.
«
1"' STATE OF ALASKA f
ALASK~, JIL AND GAS CONSERVATION COMtv..3SION
APPLICATION FOR SUNDRY APPROVAL
h-l{ It,-
0;:; I/°
I-'
/'""
1. Type of Request: III Abandon 0 Suspend III Plugging 0 Time Extension 0 Perforate
0 Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance III Other
0 Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate Re-Enter Ops Shutdown
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of well:
181 Development
0 Exploratory
0 Stratigraphic
0 Service
6. Datum Elevation (DF or KB)
KBE = 67.48'
7. Unit or Property Name
Prudhoe Bay Unit
4. Location of well at surface
2204' SNL, 712' EWL, SEC. 35, T12N, R12E, UM
At top of productive interval
2178' SNL, 1888' WEL, SEC. 34, T12N, R12E, UM
At effective depth
1811' SNL, 2533' WEL, SEC. 34, T12N, R12E, UM
At total depth
1811' SNL, 2533' WEL, SEC. 34, T12N, R12E, UM
12. Present well condition summary
Total depth: measured
8. Well Number
S-17B
9. Permit Number
~01-145 I 301-250
10. API Number
50-029-21148-02 \,/
11. Field and Pool
Prudhoe Bay Field I Prudhoe
Bay Pool
true vertical
10445 feet
8882 feet
10445 feet
8882 feet
Plugs (measured)
Set Open Hole Whipstock at 9475' (wI Cut 2-7/8" Liner
below, S-17AL 1,9525' - 10196'), 08/01
true vertical
Effective depth: measured
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD TVD
110' 110'
2663' 2663'
8300' 7761'
8035' - 9450' 7530' - 8728'
110'
2634'
8274'
20" X 3011
13-3/811
9-51811
8 cu yds Concrete
4000 cu ft Arctic Set III & II
2214 cu ft Class 'G'
1405'
711
450 cu ft Class 'G'
Perforation depth: measured
NIA
RECEIVED
true vertical
NIA
JAN 0 9 2002
Tubing (size, grade, and measured depth)
4-1/211, 12.6#, NT13Cr80 to 8084'
Alaska Oil & Gas Cons. Commission
Anchorage
Packers and SSSV (type and measured depth) 9-5/811 Otis 'HVT' packer at 8002'; 4-1/211 Cameo SSSV LN at 2111'
13. Attachments
181 Description Summary of Proposal
0 Detailed Operations Program
15. Status of well classifications as:
181 Oil 0 Gas 0 Suspended
0 BOP Sketch
14. Estimated date for commencing operation
January 21, 2002
16. If proposal was verbally approved
Service
Name of approver
Contact Engineer Name/Number: Ted Stagg, 564-4694
17. I hereby certify that the fore o' g i and correct to the best of my knowledge
Signed Ted Stagg Title CT Drilling Engineer
Date Approved
Prepared By Name/Number: Terrie Hubble, 564-4628
Date 1- f -0 Z-
Conditions of Approval: Notify Commission so representative may witness 1»5"CC:> "c;\ ~Y\~";.~
Plug integrity - BOP Test î Location clearance -
Mechanical Integrity Test Subsequent form required 10- "'Ù '"\
lmginal Sìgned By
A roved b order of the Commission
Form 10-403 Rev. 06/15/88
Approval No. 3);) - 0 l Li
Commissioner
(
("
BPX
S-17c Sidetrack
Summary of Operations:
Operations on S-17b were shut down on August 17, 2001 due to mechanical difficulties. This well will be re-
entered and drilled to a new target located approx. 500 ft from the S-17b target. S-17b will become an
abandoned open hole.
Phase 1: Confirm integrity. Pump cement to isolate S-17b open hole. Planned for Jan. 21, 2002
. Pressure test tree, wing and master valves
. Integrity test IA.
. Drift well with dummy whipstock.
. Use service coil to lay in and downsqueeze approx. 20 bbls 17 ppg cement to isolate the S-17b open
hole and provide a kick off plug for S-17c. The window milled for S-17b will be salvaged and used for
S-17c.
Phase 2: Drill and Complete S-17c sidetrack: Planned for Feb. 1,2002
Drilling coil will be used to dress off cement just outside the existing window, kick off and drill 3 3,4"
hole to the new S-17c BHL. The sidetrack will be completed with a fully cemented liner.
Mud Program:
. Phase 1: Seawater
. Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg)
Disposal:
. No annular injection on this well.
. All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program:
. 3 V2", 8.8#, L-80, ST-L x 3 3/16",6.2#, L-80, TCII x 27/8",6.2#, L-80, ST-L, solid liner will be cemented
from TD to approx. 8045' MD (7562' ss). This liner will be cemented with approx. 24 bbls of 15.8ppg
class G cement to place TOC approx. 300 ft above the window.
Well Control:
. BOP diagram is attached.
. Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi.
. The annular preventer will be tested to 400 psi and 2200 psi.
Directional
. See attached directional plan
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
. An MWD Gamma Ray + Resistivity log will be run over the open hole section.
Hazards
H2S was measured at 30 ppm on May 20, 2001.
Reservoir Pressure
Res. press. is estimated to be 3300 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface
is 2244 psi.
;
",
(
TREE =
4-1116" CIW
W8...LHEAD = M:EVOY
A CTl.i4. T OR = BAKER
KB. ELEV = 67.5'
BF. ELEV = 38.83'
KOP= 3100'
Max Angle = 93 @ 9757'
Datum MD = 9560'
DatumTVD = 8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347"
2662'
Minimum ID = 3.75" @ 9450'
OPENHOLE SDTRK WINDOW
TOPOF BKR llEBACK SLV, ID = 7.5"
9-518" X 7" BAKER LINER HANGER, ID = 6.276"
8035'
8042'
4-1/2"TBG,12.6#, 13CR, 0.0152 bpf, ID =3.958"
8083'
19-518" CSG, 47#, L-BO, ID = 8.681" H
8300'
PERFORATION SUMMt>. RY
REF LOG: IVWVD 10/11/91 & RADUSLOG 07/26/95
ANGLEA TTOP ÆRF: 68 @ 9620' /88 @ 9916'
I\bte: Refer to A"oduction DB for historical [erf data
SIZE SPF INTER\! AL Opn/Sqz Dð. TE
5-17 A
3-3/8" 6 9620 - 9635 0 1 0f20/91
3-3/8" 6 9641 - 9647 0 1 0f20/91
3-3/8" 6 9650 - 9701 0 1 0f20/91
3-3/8" 6 9705 - 9709 0 1 0f20/91
3-3/8" 6 9711 - 9720 0 1 0f20/91
S-17AL 1 5DTRK
1-9/16" 4 9916 - 9936 0 08/07/95
1-9/16" 4 10030 - 10050 0 08/07/95
1-9/16" 4 10170- 10190 0 08/07/95
9981'
7" LNR 26#, NTBOS,13CR, 0.0383 bpf, ID = 6.276"
10060'
8-178
SAFETY I\IOTES: 4-1/2" a;RDrvE 1BG & 7" CI-ROMELNR
W8...L > 70 DEG @ 9633' Af\D > 90 DEG @ 9727'. * AN
A LA-IA OÆNH)LE WHIPSTOCK WA S PR8v1A TU RELY
SET @ 7733' DJRlNG cm SIDETRACK OPS ON 08/17/01.
8 2111' 4-112" CAMCO SSSV NP, ID = 3.813"
ST MD TVD DEV lYÆ VLV L TCH POR Dð.TE
5 3063 2993 9 OTIS DV RA 0 07/19101
4 5255 4974 29 OTIS DV RA 0 07/19101
3 7182 6688 24 OTIS DV RA 0 07/19/01
2 7895 7339 27 OTIS DV RA 0 07/1910 1
1 7961 7398 28 OTIS DV RA 0 7/19/2001
7990'
8002'
-14-1/2" PARKER SWS NIP, ID = 3.813" I
9-518" X 4-112" OTIS HVT PKR, 3.880"
8051'
8072'
4-1/2" PARKER SWN NIP, MLLBJ TO 3.800"
4-1/2" PARKER SWS NIFPLE, ID = 3.813"
8084'
8078'
4-112" W/LEG
HELMDTTLOGGBJ 10/19/91 I
-
9-518" CSG MILLOUT WINDOW
8300' - 8380' (SECllON MLL )
NO1E: PR6-SIDETRAO< WELLBORE
NOT SH)WN BELOW 9-518" CSG
SEcrlON WINDOw.
..--.-----.--..-------- -....... -- --.--.-....-----.-----------
7" LNR MLLOUTWINDOW
9450' - 9456' (Whipstock @ 9445')
2-7/8" LNRSTUB FROM S-17AL1
I 10196' I OLD 2-7/8" LNRSHOE
3-3/4" OPEN HOLETD ( S-17B )
DATE REV BY COtv'MENTS Dð. TE REV BY COtv'Me-J1S
08/20/84 HF ORIGINAL COMPLETON 07/12/01 RN/tlh CORRECllONS
10/19/91 PAB CTD SDETRACK COI'vPL. 08102/0 1 JKBffP CI-EM CUT
07/29/95 JAM 2ND CTD SIDETRACK 08118/01 C/-VKAK A TIEI\tPT CTD SIDETRACK
03/15/01 S IS-\¡[) FINAL 08129/0 1 DDNiKK PLLL WHPSTOO<
07/07/01 RN/tlh CORRECTONS 09/24/01 WOJiKK WS DEPlH CORREcrlON
PRUDHOE BA Y UNIT
W8...L: S-17B
ÆRMIT No: 201-145
APII\b: 50-029-21148-02
2204' SNL & 712' EWL, Sec. 35, T12N, T12E
BP Exploration (Alaska)
,¡,
( S-17C (
PROPOSED CTD SIDETRACK
TREE = 4" CrN
WB...LHEAD= McEVOY
............""-""""""--"""-""""'" -........-........................-
ACTUATOR= BAKER
-. -----....-..----,-
KB. B...EV = 67.5'
....-..-."'" -..-.... -....... -..................................
BF. B...EV = 38.83'
---_oo-,- ---.-. ....'------- --...,----
KOP = 2700
....-......."- ..-.............. . .... ..-.... .......-........... ---....... -----
Max Angle = 93 @ 9757'
-----.-----....---.-
Datum MD = - 10104
.......--..-..---- -------...-...-..-...'-"'--'"
Datum 1VD= 8800' SS
'13-3/8" CSG, 72#, L-80, ID = 12.347" 1
TOPOF 7" 13CRLNR I
'TOp of Proposed 3-1/2" Liner I
80351
14-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958"
19-5/8" CSG, 47#, L-80, ID = 8.681" I 83001
11st Milled Window section I~ 83001 - 8380 1
'2nd Milled Window off Mech Whipstock I
I 94451 I TOP OF WHIPSTOCK
ÆRFORA TION SUMMA RY
REF LOG: Radius Log 7/26/1995
ANGLE AT TOP PERF: 88 @ 9916'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
1-9/16" 4 9916 - 9936 0 08/05/95
1-9/16" 4 10030 - 10050 0 08/05/95
1-9/16" 4 10170 - 10190 0 08/05/95
PBTD I
17" LNR 26#, NT80S,13CR, 0.0383 bpf, 10 = 6.276" 1
8
21111
ST MD
5 3062
4 5254
3 7181
2 7895
1 7961
79891
80021
80021
80521
80711
80841
80781
-14-1/2" CAMCO SSSV NIP, 10 = 3.813"
GAS LIFT MANDRB...S
1VD DEV TYPE VLV LATCH SIZE DATE
2993 9 OTIS RA
4974 29 OTIS RA
6688 24 OTIS RA
7339 27 OTIS RA
7398 28 OTIS RA
-14-1/2" PARKERSWS NIPPLE, 10= 3.813"
-1 OTIS RA TCH LATCH I
-19-5/8" OTIS HVT PKR, ID = 3.880" I
-14-1/2" X NIPPLE, ID = 3.813" I
-14-1/2" XN NIPPLE, Milled out, 10 = 3.800"
-14-1/2" W/LEG I
1-1B...MDLOGGED10/19/91 I
3 3/16" X 2 7/8" XO @ 9505
Proposed 2-7/8" L-80 Liner - Cemented & Perf'd
-11130011
-,~.:t1',A:r}~.
,".. ...'.",
.:\;1~::<;:.:\~'-;:' .
"i~('...._.---
":-0',.::'1;,.: :~)
'. .~::~':;. ~ '.:-:';,-
3-3/4" OH
-1 Open Hole Whipstock 1
12-7/8" LNR, 6.16#, ST-L, .00579 bpf, ID=2.441" 1-11019611
DATE REV BY COMMENTS DATE REV BY COMMENTS
08/20/84 HF ORIGINAL COMA..ErION 07/18/01 pcr S-17B Proposed Sidetrack
10/19/91 PAB em SIDETRACK COMA...
07/29/95 JAM 2ND em SIDETRACK
03/15/01 SIS-MD FINAL
07/07/01 RNItlh CORRECTIONS
PRUDHOE BAY UNrr
WB...L: S-17B Proposed
PERMrr No: 95-048
API No: 50-029-21148-01
Sec. 35, T12N,T12E
BP Exploration (Alask )
12/06/01
ScblllDbepger
NO. 1672
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage. AK 99503-5711
ATTN: Sherrie
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe BaY,Niakuk
.
Well
Job#
Log Description
Date
Blueline
Sepia
Color
Prints
CD
'---=--
NK-07 A -~()I-()fo"'-6 21342 CDRlADN 04/22/01 1
NK-07 A 21342 MD VISION RESISTIVITY 04/22/01 1 1
NK-07 A 21342 TVD VISION RESISTIVITY 04/22/01 1 1
NK-G7 A 21342 MD VISION DEN/NEUTRON 04/22/01 1 1
NK-07 A 21342 TVD VISION DEN/NEUTRON 04/22/01 1 1
S-178 ~f\J-,L/ -~ 21483 SLlMPULSElGR 08/16/01 1
S-178 21483 SLlMPULSElGR 08/16/01 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc,
Petrotectnical Data Center LR2- 1
900 E, Benson Blvd.
Anchorage. Alaska 99508
RECEIVED
Date Delivered:
D,Ct" 0 7 r¡OO1
.L~ f L
Alaska at & Gas Cons. Commi8sion
AñaIorage
Schlumberger GeoQuest
3940 Arctic Blvd. Suite 300
Anchorage. AK 99503-5711
ATTN: Sherrie
Received ~ ~
tOY IS d-
~Dl/ \ S~
t,\) 1- J 4~
bp
I"
,
Date: 10-01-2001
Transmittal Number:92263
'~
,
BPXA WELL DATA TRANSMITTAL
Enclosed are the materials listed below. If you have any questions, please contact me in the PDC
at 564-4091.
Top
8W Name Date Contractor Loa Run Depth Bottom Depth Log Type
DS01-04A 08-29-2001 ANADRILL 1 9100 10640 SURVEY REPORTIHARDCOPY (2EA)
SURVEY REPORT/DISKETTE (lEA)
07-16A 09-10-2001 ANADRILL 1 10400 12368 SURVEY REPORTIHARDCOPY (2EA)
SURVEY REPORT/DISKETTE (lEA)
8-17B 08-17 -2001 ANADRILL 1 9462 10445 SURVEY REPORTIHARDCOPY (2EA)
SURVEY REPORT/DISKETTE (lEA)
~ ~ J...P :;)
Please Sign and Return one copy of this transmittal.
Thank You,
James H. Johnson
Petrotechnical Data Center
Attn: Lisa Weepie (AOGCC)
Attn: Sandy Lemke (Phillips Alaska)
Attn: Susan Nisbet (Exxon Mobil Production)
RECEIVED
OCT 0 4 2001
Alaska Oil & Gas Cons. Commission
Anchorage
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
( 5-178 - 8/17/2001 (
OPERATIONS SHUTDOWN STATUS
2111' 4-112" CAMCO SSSV NIP, Ð = 3.813"
8
GAS LFT MANDR8..S
ST M) lVD DEV lYÆ VLV LATŒi SIZE DATE
5 3062 2993 9 OTIs RA
4 5254 4974 29 ons RA
3 7181 6688 24 ons RA
2 7895 7339 27 ons RA
1 7961 7398 28 ons RA
7989' 4-1/2" PARKER SWS NIPPLE,ID = 3.813"
8002' ons RA TŒi LA TŒi
8002' 9-5/8" ons HVT A<R, D = 3.880"
'T"REE =
W8.. L HEA D=
- .
ACTUA TOR=
-.. ... --.. ,.- .
KB. H.EV =
-. "- ~- ..-
BF. H.EV =
. ---n-- ----. -
KOP=
... ...-- - .. - ...
Max Angle =
".'" - ---
Datum MD =
.. ..- - - - -- . -
Datum lV D=
4" CfN
McEVOY
BAKER
. --'-----'--
67.5'
38.83'
2700
- . -.." ..----- .
93 @ 9757'
...- . ----- -----_.. -
10104
-..- - ---
8800' SS
13-3/8" CSG, 72#, L-80, Ð = 12.347"
Alumnum Whipstock I Rug nadvertentty Set
TOP OF 7" 13CR LNR
8035'
4-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, Ð = 3.958"
9-5/8" CSG, 47#, L-80, D = 8.681" 8300'
11 5t Milled Window section 1-1 8300' - 8380 I
¡2nd Mlled Window off Mach Whipstock H 9450' - 9456'1
9445' TOP OF WHPSTOCK
PERFORA TION SUMMARY
Ra= LOG: Radius Log 7/26/1995
ANGLE AT TOP PERF: 88 @ 9916'
Note: Refer to A"oduction DB for historical perf data
SIZE SPF MERVAL OpnlSqz DATE
1-9/16" 4 9916 - 9936 0 08/05/95
1-9/16" 4 10030 - 10050 0 08/05/95
1-9/16" 4 10170 - 10190 0 08/05/95
17" LNR 26#, NTBOS,13CR, 0.0383 bpf, Ð = 6.276" 1
8052'
8071'
4-1/2" X NIPPLE, Ð = 3.813"
4-1/2" XN NIPPLE, Milled out, D = 3.800"
8084'
8078'
-14-1/2" W/LEG I
H B.MD LOGGED 10/19/91 I
2-718" LNR, 6.16#, ST-L, .00579 bpf, Ð=2.441"
Mill Window off Mach Whipstock in Open Hole
Existing 2-7/8" Liner Cut & Pulled fl
3-3/4" OH
OH Depth @ lime of Operation Shutdow n
DATE REV BY COMMe-lTS DATE REV BY COMMENTS
08120/84 HF ORIGNAL COMPLETION 07/18/01 per S-17B A"oposed Sidetrack
10/19/91 PAB em SÐETRAa< COMPl. 08/20/01 per S-17B Ops SID
07129/95 JAM 2 NO em S ÐETRA a<
03115101 SIS-MD FNAL
07/07/01 RWtIh CORRECTIONS
PRUDHOE BA Y UNIT
WH.L: S-17B Op5 Shutdow n
PERMIT No: 195-048
API No: 50-029-21148-01
Sec. 35,T12N, T12E
BP exploration (Alaska)
Well:
Field:
API:
Permit:
(
(
07/31/01
08/05/01
08/18/01
Nabors 3S
--.- ---- -- --- --- ---- ---.- - --..- - ----.- --... -------- -. ----.--- - --- --.------ -....----- - -----.-.--- --..-. --- - .- - ---.- ----- ----..---- ----- --------'--- - - -- -- --..... -- -_n- ....- . --- -- ----- - -
S-17B (Ops SID)
Prudhoe Bay Unit
50-029-21148-02
201-145
Rig Accept:
Rig Spud:
Rig Release:
0 ri iii n g..£!!g :
07/26/01
Load and kill well. Freeze protect to 3300'. Move in SWS. Logged GRICCL jewelry from 9566' to
7850' for tie-in. Cut 2-7/8" liner at 9525' with 2-1/8" chemical cutter. Good indication of shot.
Completed static survey.
PRE-RIG WORK
07/28/01
Successfully pressure tested tree and tubing.
..,
( STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMIt>SION
REPORT OF SUNDRY WELL OPERATIONS
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska
1. Operations performed: IBI Operation Shutdown 0 Stimulate 0 Plugging 0 Perforate
0 Pull Tubing 0 Alter Casing 0 Repair Well 0 Other
5. Type of well:
181 Development
0 Exploratory
0 Stratigraphic
0 Service
6. Datum Elevation (OF or KB)
KBE = 67.48'
7. Unit or Property Name
Prudhoe Bay Unit
99519-6612
4. Location of well at surface
2204' SNL, 7121 EWL, SEC. 35, T12N, R12E, UM
At top of productive interval
2178' SNL, 1888' WEL, SEC. 34, T12N, R12E, UM
At effective depth
1811' SNL, 25331 WEL, SEC. 34, T12N, R12E, UM
At total depth
1811' SNL, 25331 WEL, SEC. 34, T12N, R12E, UM
12. Present well condition summary
Total depth: measured
true vertical
8. Well Number
S-17B
9. Permit Number I Approval No.
201-145 301-250
10. API Number
50- 029-21148-02
11. Field and Pool
Prudhoe Bay Field I Prudhoe Bay
Pool
Effective depth:
measured
true vertical
10445 feet
8882 feet
10445 feet
8882 feet
Plugs (measured)
Set Open Hole Whipstock at 94751 (wi Cut 2-7/811 Liner
below, S-17AL1, 9525' -101961),08/01
Fish: Rubber elements from whipstock left in hole, 08/01
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented MD TVD
8 cu yds Concrete 110' 1101
4000 cu ft Arctic Set III & II 2663' 2663'
2214 cu ft Class 'G' 83001 77611
450 cu ft Class 'GI 8035' - 9450' 7530' - 8728'
110'
26341
82741
20" X 30"
13-3/8"
9-5/8"
1405'
7"
Perforation depth: measured
N/A
true vertical
N/A
Tubing (size, grade, and measured depth)
4-1/2", 12.6#, NT13Cr80 to 8084'
Packers and SSSV (type and measured depth) 9-5/8" Otis 'HVr packer at 8002'; 4-1/2" Camco SSSV LNat 2111'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
OCT 0 2 2001
Alaska Oil & Gas Cons. Commission
14.
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments
181 Copies of Logs and Surveys run
181 Daily Report of Well Operations
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Si ned Terrie Hubble Title Technical Assistant
16. Status of well classifications as:
181 Oil 0 Gas 0 Suspended
Service
Date I 0 rO~.O
Form 10-404 Rev. 06/15/88
Prepared By Name/Number: Terrie Hubble, 564-4628
Submit In Duplicate
1
,
" ,
( STATE OF ALASKA (-
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SU N DRY APPROVAL
JM f-r
3/2~IÓI
b f ;)1--\
Pv::r rP /
/Zó
1. Type of Request: 0 Abandon 0 Suspend 0 Plugging 0 Time Extension 0 Perforate
0 Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance 0 Other
0 Change Approved Program II Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface v' if ~
2204' SNL, 712' EWL, SEC. 35, T12N, R12E, UM
At top of productive interval
2178' SNL, 1888' WEL, SEC. 34, T12N, R12E, UM
At effective depth
5. Type of well:
I8J Development
0 Exploratory
0 Stratigraphic
0 Service
6. Datum Elevation (DF or KB)
KBE = 67.48'
7. Unit or Property Name
. Prudhoe Bay Unit
2. Name of Operator
BP Exploration (Alaska) Inc.
At total depth
1568' SNL, 3363' WEL, SEC. 34, T12N, R12E, UM (As Planned)
12. Present well condition summary
Total depth: measured 10445 feet Plugs (measured)
true vertical 8814 feet
Effective depth: measured 7748 feet
true vertical 7274 feet
8. Well Number J
S-17B
9. Permit Number
201-145 v
10. API Number
50- 029-21148-02
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
Set Open Hole Whipstock at 9475'; Inadvertently Set
Open Hole Whipstock at 7748' (inside tubing)
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented MD TVD
8 cu yds Concrete 110' 110'
4000 cu ft Arctic Set III & II 2663' 2663'
2214 cu ft Class 'G' 8300' 7761'
450 cu ft Class 'G' 8035' - 9450' 7530' - 8728'
110'
2634'
8274'
20" X 30"
13-3/8"
9-5/8"
1405'
7"
Perforation depth: measured
N/A
RECEIVED
true vertical
N/A
AUG 2 1 2001
Tubing (size, grade, and measured depth)
4-1/2", 12.6#, NT13Cr80 to 8084'
Alaska Oil & Gas Cons- Commission
Anchorage
Packers and SSSV (type and measured depth) 9-5/8" Otis 'HVT' packer at 8002'; 4-1/2" Cameo SSSV LN at 2111'
13. Attachments
I8J Description Summary of Proposal
0 Detailed Operations Program
15. Status of well classifications as:
I8J Oil 0 Gas 0 Suspended
0 BOP Sketch
14. Estimated date for commencing operation
~~~,,=>~c'~ 17,2001
16. If proposal was verbally approved
- Tom Maunder
Name of approver
Contact Engineer Name/Number: Ted Stagg, 564-4694
17. I hereby certify that the for: and correct to the best of my knowledge
Signed Ted Stag' - Title CT Drilling Engineer
8/17/2001
Date Approved
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
Conditions of Approval: Notify Commission so representative may witness
Plug integrity - BOP Test - Location clearance -
Mechanical Integrity Test .. ßJ.!þ§eQYElRtform required 1 0- lJ..{:)~ ö~ <:"~'t'I\Ð \~\:() "-
--:orlglOai ~Igneo oy \
A roved b order of the Commission echsli Commissioner
Form 10-403 Rev. 06/15/88
ORIGINAL
bp
(
f
August 20, 2001
To:
BP Exploration Alaska Inc.
Drilling & Wells
Coiled Tubing Drilling Team
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Tom Maunder
Petroleum Engineer
Subject:
Well S-17b Operation Shut Down
CTD sidetracking operations on S-17b were shut down on August 17, 2001. Open hole
had been drilled to 10,445' MD when a decision was made to perform an open hole
sidetrack. To facilitate the sidetracking operation an aluminum kick off plug was run
with the intention of setting the plug in open hole at approximately 9780' MD. On the
way in the hole the aluminum kick off plug became stuck in the 4 Y2" tubing at 7748'
MD. When the setting tool was retrieved the shear stud was found to be sheared,
indicating a full set of the aluminum plug.
The well was freeze protected with crude to 2500 ft and a BPV set in the tubing hanger.
Nabors 3S has now moved off the well.
The tools needed for fishing this plug must be manufactured and tested before
operations can resume. We currently expect to resume this operation within 30 days.
Ted Stagg ~
CT Drilling Eng.
907 564-4694
Well File
Petrotechnical Data Center
Terrie Hubble
...
."f.tll,
.....,~ ~.~
~.- ~...'"
*~~ .¡:~"
.'I'.~I\.
".
Re: PBU 5-178 (201-145) suspension of cm sidetrack
\
Subject: Re: PBU 8-178 (201-145) suspension of CTD sidetrack
Date: Fri, 17 Aug 2001 13:02:49 -0800
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Johnson, Mark 0" <JohnsoMO@BP.com>
CC: AOGCC North Slope Office <aogcc_prudhoe_bay@admin.state.ak.us>, Ted Stagg <staggto@bp.com>,
Terrie Hubble <hubbletl@bp.com>
,c
{
Mark,
Thanks for the information. Doesn't look like you have much of an operational
choice. Yes, providing the sundry on Monday will be fine. Please include an
estimate of when the CT drilling operations could resume.
Tom Maunder
"Johnson, Mark 0" wrote:
> Tom,
>
> This a-mail is to inform you that CTD is suspending sidetrack activities on
> well PBU $...178. An aluminum whipstock/plug has been inadvertently set in
> the production tubing at - 7748'. The plan is for Nabors 38 to move off
> S-178 and over to 01-04A (all permits approved) over this weekend.
:>
> $-178 has been freeze protected. KWF, BPV, and master valve secures the
> well.
>
> We believe that the aluminum whipstock/plug can be retrieved once fishing
> tools are constructed. Ted Stagg and Terrie Hubble will prepare the
> "temporary halt of drilling operations" sundry you requested on Monday.
>
> Thx MOJ
I~~-. ...- .----~ d- -- -
Tom Maunder <tom maunder@admin.state.a~> .
Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of 1
8/17/011:03 PM
I/,
ANADRILL
SCRLUMBERGER
Survey report
Client...................: BP Exploration (Alaska) Inc.
Field....................: Prudhoe Bay Unit
Well.....................: S-17B
API number...............: 50-029-21148-02
Engineer.................: M. Brown
COUNTY:..................: Nabors 3S / Dowell # 4
STATE:...................: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS...........: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: Gr Tiein 9260
GL above permanent.......: -50000.00 ft
KB above permanent.......: 67.50 ft
DF above permanent.......: -50000.00 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from rotary table to target:
279.40 degrees
[(c)2001 Anadrill IDEAL ID6_1C_10J
17-Aug-200101:56:45
Spud date................:
Last survey date.........:
Total accepted surveys...:
MD of first survey.......:
MD of last survey........:
Page
1 of 2
17-Aug-01
29
9462.00 ft
10445.00 ft
(
----- Geomagnetic data ----------------------
Magnetic model...........: BGGM version 2000
Magnetic date............: OO-Y- 0
Magnetic field strength..: -999.25
Magnetic dec (+E/W-).....: -999.25
Magnetic dip.............: -999.25
----- MWD
Reference
Reference
Reference
Tolerance
Tolerance
Tolerance
survey Reference
G.............. :
R.............. :
Dip............ :
of G...........:
of R...... . . . . . :
of Dip.... . . . . . :
RCNT
degrees
degrees
Criteria ---------
1000.00 mGal
1000.00 RCNT
0.00 degrees
2.50 mGal
6.00 RCNT
0.45 degrees
(+/-)
(+/-)
(+/-)
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: -57252.81 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: -57252.81 degrees
(Total az corr = magnetic dec - grid conv)
Sag applied (Y/N)........: No degree: 0.00
(
»
ANADRILL SCHLUMBERGER Survey Report
---
Seq
#
---
--------
--------
Measured
depth
(ft)
--------
--------
1
2
3
4
5
9462.00
9499.00
9532.00
9562.00
9598.00
------
------
Incl
angle
(deg)
------
------
39.20
46.80
53.00
57.00
59.20
60.40
63.10
66.50
72.40
77.90
81.50
83.40
84.50
85.80
86.40
86.70
88.70
91.90
94.80
95.20
96.70
97.80
96.60
94.10
91.10
91.70
91.90
90.53
90.53
-------
-------
Azimuth
angle
(deg)
-------
-------
334.20
333.00
330.00
326.00
319.60
315.10
309.20
305.50
303.70
302.00
304.50
308.50
313.50
318.00
318.60
313.50
302.80
306.30
312.30
317.20
312.30
309.50
308.10
306.00
306.70
292.90
289.30
281.11
281.11
------
------
Course
length
(ft)
------
------
0.00
37.00
33.00
30.00
36.00
33.00
30.00
32.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
45.00
32.00
52.00
31.00
64.00
19.00
28.00
26.00
24.00
58.00
21.00
37.00
75.00
[(c)2001 Anadrill IDEAL ID6_1C_10]
6
7
8
9
10
9631.00
9661.00
9693.00
9723.00
9753.00
11
12
13
14
15
9783.00
9813.00
9843.00
9873.00
9903.00
16
17
18
19
20
9933.00
9978.00
10010.00
10062.00
10093.00
21
22
23
24
25
10157.00
10176.00
10204.00
10230.00
10254.00
26
27
28
29
10312.00
10333.00
10370.00
10445.00
--------
--------
TVD
depth
(ft)
--------
--------
8670.25
8697.29
8718.54
8735.75
8754.79
8771.39
8785.60
8799.23
8809.75
8817.44
8822.80
8826.75
8829.91
8832.45
8834.49
8836.29
8838.11
8837.94
8834.90
8832.19
8825.56
8823.16
8819.65
8817.22
8816.14
8814.71
8814.05
8813.27
8812.57
17-Aug-200101:56:45
--------
--------
Vertical
section
(ft)
--------
--------
2463.64
2478.40
2493.92
2510.18
2532.38
2554.87
2577.09
2602.66
2628.07
2654.66
2681.65
2708.12
2733.52
2757.58
2780.88
2804.89
2844.26
2873.22
2918.19
2943.37
2995.27
3011.34
3035.54
3058.47
3079.84
3134.05
3154.60
3191.37
3266.34
----------------
----------------
Displ
+N/S-
(ft)
Displ
+E/W-
(ft)
----------------
----------------
-158.75
-136.17
-114.02
-93.20
-68.89
-47.93
-30.22
-12.67
3.27
18.99
35.17
52.86
72.42
93.83
116.18
137.73
165.46
183.60
216.46
238.19
283.00
295.33
312.74
328.33
342.54
-2523.45
-2534.68
-2546.74
-2559.77
-2578.25
-2597.57
-2617.16
-2640.18
-2663.30
-2687.65
-2712.33
-2736.22
-2758.73
-2779.58
-2799.49
-2820.27
-2855.58
-2881.93
-2922.08
-2944.00
-2989.19
-3003.44
-3025.08
-3045.74
-3065.05
371.29 -3115.24
378.85 -3134.82
388.54 -3170.49
402.99 -3244.08
Page
---------------
---------------
Total
displ
(ft)
At
Azim
(deg)
---------------
---------------
2528.44
2538.33
2549.29
2561.47
2579.17
2598.02
2617.34
2640.21
2663.30
2687.72
2712.55
2736.74
2759.68
2781.17
2801.90
2823.63
2860.37
2887.77
2930.08
2953.62
3002.56
3017.92
3041.21
3063.39
3084.13
3137.29
3157.63
3194.21
3269.01
266.40
266.92
267.44
267.91
268.47
268.94
269.34
269.73
270.07
270.40
270.74
271.11
271.50
271.93
272.38
272.80
273.32
273.65
274.24
274.63
275.41
275.62
275.90
276.15
276.38
276.80
276.89
276.99
277.08
2 of 2
-----
-----
DLS
(deg/
100f)
-----
-----
0.00
20.66
20.03
17.23
16.28
12.33
19.52
14.91
20.45
19.13
14.53
14.66
16.97
15.56
2.83
17.00
24.17
14.82
12.80
15.80
7.97
15.72
6.56
12.53
12.84
23.81
17.16
22.44
proj
-----
-----
------
------
Srvy
tool
type
Tool
qual
type
-----
-----
------
------
TIP
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
(
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
MWD
(
MWD
MWD
SP
MWD
.,
,
(" S-178 - 8/17/2001 (
OPERATIONS SHUTDOWN STATUS
TREE = 4" CWI/
WalHEAD= McEVOY
-." - -- 00 -- --- ,,--.-..__n"
ACTUA TOR= BAKER
.. -' -"00 - - . ..--..--..---.... .-_..
KB. aEV = 67.5'
"....-_00"""..' ---.---.--."."-"
BF. B...EV = 38.83'
. -- ...'--.." "--" -- --.. -. .. -.--_._.. . - -----------..-..-
KOP = 2700
----.. - _"00....____-- ---_--M_____- --"---" ..n.._--_,,-
-~~. J\~..~le..::.. ...._~~~_..~?~!-'
Datum MD = 10104
... -- --..-.. .. --' _"_.._00_-- 00"-"__'-..- -.. '-"-
DatumlVD= 8800' SS
2111'
8
113-3/8" CSG, 72#, L-80, ID = 12.347" I
ST MD
5 3062
4 5254
3 7181
2 7895
1 7961
1 Aluminum Whipstock I Rug Inadvertently Set I
7989'
8002'
8002'
TOPOF 7" 13CR LNR I
8084'
8078'
8035'
8052'
8071'
14-112" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958"
19-5/8" CSG, 47#, L-80, ID = 8.681" I 8300'
11 st Milled Window section 1-1 8300' - 8380 I
-14-1/2" CAMCO SSSV NIP, ID = 3.813" I
GAS LIFT MANORB...S
lVD DEV TYPE VLV LATCH SIZE DATE
2993 9 OTIS RA
4974 29 OTIS RA
6688 24 OTIS RA
7339 27 OTIS RA
7398 28 OTIS RA
-14-1/2" PARKER SWS NIPPLE, 10 = 3.813"
-1 OTIS RA TCH LATCH I
-19-5/8" OTIS HVT PKR, ID = 3.880" I
-14-1/2" X NIPPLE, ID = 3.813" 1
-14-1/2" XN NIPPLE, Milled out, ID = 3.800"
-14-1/2" W/LEG I
1-1 ELMD LOGGED 10/19/91 I
12-7/8" LNR, 6.16#, ST-L, .00579 bpf, ID=2.441" I
¡2nd Milled Window off Mach Whipstock 1-1 9450' - 9456"
I 9445' I TOP OF WHIPSTOCK
3-3/4" OH
~\
\ ,-,~
110~H Depth @ Ture of Operation Shutdow n I
PERFORA TION SUMMA RY
REF LOG: Radius Log 7/26/1995
ANGLEATTOPÆRF: 88 @ 9916'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV A L Opn/Sqz DATE
1-9/16" 4 9916 - 9936 0 08/05/95
1-9/16" 4 10030 - 10050 0 08/05/95
1-9/16" 4 10170 - 10190 0 08/05/95
IPBTDI
17" LNR 26#, NT80S, 13CR, 0.0383 bpf, ID = 6.276" 1
DATE REV BY COMMENTS DATE REV BY COMMENTS
08/20/84 HF ORIGINAL COMPLETION 07/18/01 pcr S-17B Proposed Sidetrack
10/19/91 PAB CTD SIDETRACK COMPL. 08/20101 pcr S-17B Ops SID
07/29/95 JAM 2ND CTD SIDETRACK
03/15/01 SIS-MD FINAL
07/07/01 RN/tlh CORRECTIONS
PRUDHOE BAY UNIT
WELL: S-17B Ops Shutdow n
ÆRMIT No: 195-048
API No: 50-029-21148-01
Sec. 35, T12N, T12E
BP Exploration (Alaska)
'
(
{'
$1T&\1TŒ LID~ !A\~&\$[{&\
AlAS &A. 0 IL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 w. 7TH AVENUE. SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Thomas McCarty
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage AK 99519-6612
Re:
Prudhoe Bay Unit S-17B
BP Exploration (Alaska) Inc.
Pennit No: 201-145
Sur Loc: 2204' SNL, 712' EWL, SEC. 35,TI2N, RI2E, UM
Btmhole Loc. 1568' SNL, 3363' WEL, SEC. 34, TI2N, RI2E, UM
Dear Mr. McCarty:
Enclosed is the approved application for pennit to drill the above referenced well.
The pennit to drill does not exempt you from obtaining additional pennits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required pennitting detenninations are made.
Annular disposal has not been requested as part of the Pennit to Drill application for Prudhoe
Bay Unit S-17B
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
,.,
~ /li, I~ZUA/-
Julie M. Heusser
Commissioner
. BY ORDER OF TH~ COMMISSION
DA TED this 2.-1!;? day of July, 2001
jj clEnclosures
cc:
Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
ALAS~-
STATE OF ALASKA I
.JIL AND GAS CONSERVATION coJ,....SSION
PERMIT TO DRILL
20 MC 25.005
Þ/l,\
1 a. Type of work 0 Drill II Redrill 1 b. Type of well 0 Exploratory ~;atigraPhiC Test II Development Oil
0 Re-Entry 0 Deepen 0 Service 0 Development Gas ~ngle Zone 0 Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or Ker 1 O. Field and Pool
BP Exploration (Alaska) Inc. KBE = 67.48' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028258
4. Location of well at surface 7. Unit or Property Name 11 . Type Bond (See 20 AAC 25.025)
2204' SNL, 712' EWL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number
2178' SNL, 1888' WEL, SEC. 34, T12N, R12E, UM S-17B Number 2S1 00302630-277
At total depth 9. Approximate spud date
1568' SNL, 3363' WEL, SEC. 34, T12N, R12E, UM 07/27/01 Amount $200,000.00
12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028257, 3363' MD No Close Approach 2560 11320' MD /8919' TVD
16. To be completed for deviated wells 0 17. Anticipated pressure {see 20 MC 25.035 (e) (2)}
Kick Off Depth 9475' MD Maximum Hole Angle 99 Maximum surface 2244 psig, At total depth (TVD) 8800' / 3300 psig
18. Casing Program Specifications Setting Depth Ouantitv of Cement
Size Too Bottom
Hole Casino Weiaht Grade Couolina Lenath MD TVD MD TVD (include staae data)
3-3/4" 3-1/2" x 2-7/8" 9.3/6.16# L-80 ST-L 3275' 8045' 7472' 11320' 8919' 275 cu ft Class 'G'
Dr: r' r= 1\ Ir=. r)
I 'L-""""I Y --
19. To be completed for Redrill, Re-entry, and Deepen Operations. JUL 1 8 2001
Present well condition summary
Total depth: measured 1 0196 feet Plugs (measured)
true vertical 8883 feet Alaska Oil & Gas Cons. Commission
Effective depth: measured 10196 feet Junk (measured) Anchorage
true vertical 8883 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 20" x 30" 8 cu yds Concrete 110' 110'
Surface 2634' 13-3/8" 4000 cu ft Arctic Set III & II 2663' 2663'
Intermediate 8274' 9-5/8" 2214 cu ft Class 'G' 8300' 7761'
Production
Liner 1405' 7" 450 cu ft Class 'G' 8035' - 9450' 7530' - 8728'
Liner 2164' 2-7/8" Uncemented Solid Perforated Liner 8032' - 10196' 7528' - 8883'
Perforation depth: measured 9916' - 9936', 10030' - 10050', 10170' - 10190'
true vertical 8852' - 8853', 8859' - 8861', 8878' - 8882'
20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Thomas McCarty, 564-5697 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true and correct to the best of my knowledge Dat.
Signed Thomas McCartY / ¿ - ~ ~~ .. '... .' ,..!il,I~.. C~ Drilling Engineer
. ,',,':,"';,'..:,.,'::,- ."-,',':::1,-'..- !.i._'..."'"..:!,i',.,
,I .'-., ,¡".".,.".-:""¡:""":-",,¡.:~,,,..,.,.,,.,:-.,".":""""¡':"'::I'I:.iôim'mij:il¡~;a¡:,~-
,-",.", ",-'--:,.- '. .'.' . I. . - ,.1_.,- .
Permit Number Js API Number ~pr?~~ ~ti I See cover letter
2£)/..- / 50- 029-21148-02 for other reQuirements
Conditions of Approval: Samples Required DYes s: No Mud Log ~equi~d DYes ŒfNo
Hydrogen Sulfide Measures ~Yes DNo Directional Survey Required SYes DNo
Required Working Pressure for BOPE D2K D3K D4K D5K D10K 0 15K ~ 3.5K psi for CTU
Other: Date 1 in /01
OR~GINAl SIGNEt) BY by order of
Approved By n Do] .. Commissioner the commission
Form 10-401 Rev. 12-01-85 0 R \ b \ ',\~ j--",\ L Súbmit Vn T~iplicate
(
(,
8PX
8-178 Sidetrack
Summary of Operations:
A CTD sidetrack of well S-17 Awill be drilled. Specific prep work, (Phase 1) and drilling, (Phase 2) operations
are detailed below.
Phase 1: Isolate & integrity test inner annulus (IA), drift.
Planned for July 21, 2001
. Pressure test tree, wing and master valves
. Integrity test IA after displacing to seawater & installing dummy gas lift valves.
. Drift well with dummy whipstock.
. The liner will be cut with E-line at approx. 9525 and then pulled.
Phase 2: Drill and Complete CTD sidetrack: Planned for July 27,2001
The upper section of 2-7/8" liner will be pulled with the CTD rig. An open hole whipstock will be set
above the cut liner and 2-3/8" coil will be used to kick off in the open hole at approx. 9475' and drill a
.....1900 foot, 3-%" open hole sidetrack (as per attached plan). A solid, cemented & perforated 2-7/8"x
3-1/2" liner completion will be run.
Mud Program:
. Phase 1: Seawater
. Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg)
Disposal:
" . No annular injection on this well.
.1 . All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program:
. 3-1/2",9.3#, L-80 solid liner from 8045 (TOl) to 9535. 27/8",6.16#, L-80, solid liner be run from 9535'
to TD. Liner will be cemented in place with approximately 49bbls (annular volume plus 25% excess in
OH) of 15.8ppg class G cement.
Well Control:
. BOP diagram is attached.
. Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3500 psi.
. The annular preventer will be tested to 400 psi and 2200 psi.
Directional
. See attached directional plan
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
. An MWD Gamma Ray + Resistivity log will be run over the open hole section.
. A MCNL will be run in the cased hole.
Hazards
~ H2S was measured at 30 ppm on May 20, 2001.
Reservoir Pressure
Res. press. is estimated to be 3300 psi at 8800ss. Max. surface pressure with gas (0.12 psi/ft) to surface
is 2244 psi.
TREE =
WELLHEAD=
, ACTUA TOR=
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum lVD=
4"CNV
McEVOY
BAKER
67.5'
38.83'
2700
93 @ 9757'
10104
.. . ..
8800' SS
~. S-178 (
PROPOSED CTD SIDETRACK
8
113-3/8" CSG, 72#, L-80, ID = 12.347" I
1 TOP OF 7" 13CR LNR 1
I Top of Proposed 3-1/2" Liner 1
8035'
14-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958"
19-5/8" CSG, 47#, L-80, ID = 8.681" 1 8300'
11 st Milled Window section l-l 8300' - 8380 1
12nd Milled Window off Mech Whipstock l-l 9450' - 9456'1
1 9445' 1 TOP OF WHIPSTOCK
ÆRFORA TION SUMMA RY
REF LOG: Radius Log 7/26/1995
ANGLEATTOPÆRF: 88 @ 9916'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV A L Opn/Sqz DATE
1-9/16" 4 9916 - 9936 0 08/05/95
1-9/16" 4 10030 - 10050 0 08/05/95
1-9/16" 4 10170 - 10190 0 08/05/95
IPBTD 1
17" LNR 26#, NT80S, 13CR, 0.0383 bpf, ID = 6.276" 1-l10060' r-
2111'
ST MD
5 3062
4 5254
3 7181
2 7895
1 7961
7989'
8002'
8002'
8052'
8071'
8084'
8078'
-l4-1/2" CAMCO SSSV NIP, ID = 3.813" I
GAS LIFT MANDRELS
lVD DEV TYÆ VLV LATCH SIZE DATE
2993 9 OTIS RA
4974 29 OTIS RA
6688 24 OTIS RA
7339 27 OTIS RA
7398 28 OTIS RA
-l4-1/2" PARKER SWS NIPPLE, ID = 3.813"
-l°TIS RA TCH LATCH I
-l9-5/8" OTIS HVT PKR, ID = 3.880" 1
-l4-1/2" X NIPPLE, ID = 3.813" I
-l4-1/2" XN NIPPLE, Milled out, ID = 3.800"
-l4-1/2" WILEG 1
l-l ELMD LOGGED 10/19/91 I
12-718" LNR, 6.16#, ST-L, .00579 bpf, ID=2.441" 1
3-3/4" OH
. .0" ",,"
:"~,..,""':. ~\....,.,,~: -,..,
DATE REV BY COMMENTS DATE REV BY COMMENTS
08/20/84 HF ORIGINAL COMPLETION 07/18/01 pcr S-17B Proposed Sidetrack
10/19/91 PAB CTD SIDETRACK COMPL.
07/29/95 JAM 2ND CTD SIDETRACK
03/15/01 SIS-MD FINAL
07/07/01 RN/tlh CORRECTIONS
PRUDHOE BA Y UNIT
WELL: S-17B Proposed
ÆRMrT No: 95-048
API No: 50-029-21148-01
Sec. 35, T12N, T12E
BP Exploration (Alas ka)
(
(
38 CTD 80 P Detai I
-- CT Injector Head
--- Stuffing Box (Pack-Off), 10,000 psi Working Pressure
~
- 7" Riser
Methanol Injection
8tis 7" WLA Quick
onnect -
7-1/16" 10,5000 psi working pressure
Ram Type Dual Gate BOPE ~
Manual over Hydraulic ~
Flanged Fire Resistant
Kelly Hose to Dual
Choke Manifold
7-1/16" 10, 5000 psi working pressure
Ram Type Dual Gate BOPF:::::::l
~
Manual over Hydraulic
MOJ
5/21/01
Annular BOP (Hydril),7-1/16" 10
5000 psi working pressure
Fire resistant Kelly Hose to
Flange by Hammer up 1/4 Turn
Valve on OS Hardline to Standpipe
manifold
I 2 7/811 Combi Pipe/Slip
I 2 3/811 Combi Pipe/Slip
XO Spool as necessary
Single
Manual Master Valve
(optional depending
on RU)
2" Side outlets
@
2 flanged gate valves
7" Annulus
o~
9 5/8" Annulus
I
I
~ COMPASS for Windows - CFW 1996.1 Single User (Read Write) 1!!Ir;] Ei
fie SectIon Edit VIew Plðmint;¡ :";1 V<=)' Anticollision utatios WIndow ~
J ~ ~ I *' ¡ Ii Hi All .I: I II-. ~~ iiI @) '- fi) I Ell ~'t¿ . I:] I S§ i8 I ~, " I rt1 .
1m
,'.5t<1t~'",.,.,"",'""',".,, ,','",'",',..'.",',"."'.,',,',,',,'.,,..."::',':.',>"~~',".".,'i",,. " ".'."'"',,,'.."(;1£1
,---"- - - -- -- ----------- - - --_._--------,-- .-- -- - - --.." --. ---..- ,..,.---,,---....,..,---.........---'------"'----
',,",:.'i,.,..:""......"..£!
+ 11811 ICl Co I Leo I "- ¡ ole! I ~ 'è ~ ! ~ I i
~_~¡:PlânEdjtQr:':'PJan#B.:..oao',,' ,."",.,.""".":"i..i,',"'.,'..".,:,,,,:.,.,,:>:.,i:,:::::,:'::";i-\",:"'i':'i':::,',',.,',':.".'.""",',','.""',',', '",'""','".".,':..",:,'.,'....""..',,,,,.',::',::' . ,,'.,",.':I!I~EJ
-'."'"-"""""....,,, """"'...""""""""""'" ""-""""'-."'. ,-""""""""",--,,--,-,,""-,"'--"---""'--"""'---""""-""""'----.'-..-"..,.,.>,.. -........'. -,""',',- ""----""",,---,...--,..,,.........--.
MD Inc Azi TVD NS EW V.See Dogleg T.Face Build TUln . Cl '
(ft) de (deg) (It) (II) (II) (II) (deg/1 DOH) (dee) (degl1 DOtI) (degl1 rom' . . (It) . Section T)IPe Target
1 ',945000 ,39.12: 1335:35.":,8729.43','.L-165.61'A:.-2520.24',O,OO:--:;::io.oo.', -¡D.OO:.'",O.OO,'::.\',o.OO;":':."'i-9450.00;:'iTí,," ';-':';".:"'.~"'¡-":':;4J:...:,,::J>\';i../¡,,';!i,,; ,
"""""'._,,-'" -..-.. _..~"..,- -,...~.. --, .. """;,:,¡"",-"""""-."""",,,,,'.I..,-,..t-- 'N' A....,- ,--_..~,.. -.. ,.,,'.."'. ......_""...,.., - -" ""-'---~"-'.".""""'.""'I.".""'Ir'O:~,,"i'.""'- -'-"¥'r'
2 9460_00 . ~..1.!.2- .:J33,;;3..5,'.:'...J~~.P9.',;..l-~..5~V§~':>T~R:J§'J5.'~,::":"~j20,00 . O,O02,O,.Qq ,',:. ,1'0:,99!~¡~~;:;':11"0 90.._,.. .,~rU~1...D_:;:J2f.~t.~:~;.L':;,~~~~::,)2i,::"U:..¿'~~
3 ,~7~_~ , -: noo :'?81.~,~.;,...l~.Q4.,..P... .:1:~~~:"~, :~=~~.:.1~xJ~,1~.,~..,~:_.¡ 18,00 29000 J.1:.?8. .,~::.,:-]~~o.~.:.f,~.::~~1.~~~~,:;,\¡QI~.!!:1~~:' ::,.'":~!i-:I';:.i.;.;,, ~Jl;..:,::..;,t:'~¡;i~..;nw.;. ':~':.:;t,,~
4 .~~,~" ; 90 00 .~~:~ "..;--¡~,9J~~~._..,¡1,?:~..:~.",;~~,Ç.~~:~h~.Q1.~',:,.:.~ 1S 00 .50 00 ).1..-~ "'"" V~~~!-,:::,.,..¡J~.-?~.,-.;dP!,~J9C..::,:;";.,,:::'::,:,i:~~';,,.. ,~",..~~~~~~L"~;;::';:';;':"h;_:,j
5 ~~,17,.. i 9900 ,. .2?9..?t - l~I~P~:~ _,l~M~,.~...'..~,:~§},_.,,~~j~..:,.:.:.t 18,00 , 298,00 .8.~..... .i.:1§.I!4'~"":":H.~.Ji"':,i:LR1~.I.I'!;,,_...~.:::.1.~','.~'::..~, "",-::,:,;:~:;'¿::~.::.:;':;, ;~L.'I
6 1019817 r94.~-,.,~31.6.~. .:. ~~~"'~- p,~8:!8..,,- ¡:~,1~,~~~J52.!~~1....._t18,OO94'OO ,:2._D? .J'.1~0?":"I..~t205,OO", .,.DJ.],.M.Q,.\:.¡:.,'~~:~.f~.:~~,~:........;.¡;,!:'.~:'~:,::"~I':':'-"I:';"'~';j:
78 ~90.r4"5-:?2' __1990.0 0000" ;,292"'7' 42..:.!222'~ '::';'~'i.ea88-h !77"7' ~.'~' "'.¡~2"3,98' .,},,~O' ~~:---+~~~.321,,-,"~',J.~O..~..012' _7' ~..",... 1188 0000 '225780,0000 >0},'O90} .",,"" " i ~'1FB,~.5900-_<"';'~,~'1]2.2-5-,'~0-0 ¿].DD-,TT"'~1"-MI,!:1.~D'~.~/"~~.,:.:~':~.':',':"~.'~.:: ..,~' ;:'~::~~,~.:~';':~:'i':.':~.-';::~~,'~~:'.'¡, ,
""_,_.","""""""¡--"."'!......~,.._,,,,.._~~...:,l,I~......'.... -~....._L....._...._..1 .,..,.._...."....._..~..._"-."..,.¡-..."-....,.,."..'_,...._"....~,,,,
9 1064542 '87.65 1308.15' ,'!8B81.75 , ¡305.93'. ';'-3519.72..849.76 !18,OO 94,00 .1.17 :17.97,1200,00 D11 MD, ':',',:, ,.';, 0:,';' ., c,," ".:
10 1074542 :i5:ö9',"""'¡321.ZZ'" ""¡äè96.-79'-'ij75.Qi;":"t~3ša9:à5""f942.'O2" ";¡1S,OO 135.00 '.1f56"":ïÙiri-"""."!1O0.00 "DtiMD',"":~::':.,>:l¡""'~:::r:""':','-,"'1
11 1099542 'B6j7,~,,:..'t'27K9i"':.t'B939.öi..t490.3,,:,.t3äOö:¿f.:nï35:43 "":r18 00 28000' '4,5{""'.:"'¡':i7Jlf,..":t250,OO :bTrMi5",:,:"'",:,:~,:,,,,"':'.'r":::\:"+~.':"<:-:~',',",:';;:.":,1
12 11J4~.17 ,19'0 ÕO"', - ')öf~(~,~~,r~.4(~,-:~1~4i$~(J:~1]~,:~fi2~3:~::':'~¡ 18.00 :83.00 '~3~ '~:.:~,:':¡ij.~~C;S':~!-lsg.,!!L,~~,Ü)~~;':~:~?~::::~7:~. J:~;.:"Ò;.:,':::':r~':' :'T:i
q .' 1132002 .~,g:~........ :~O~:~4--_1.~~~.!f?_,..._.I.~~P,~~ ~ ..:~~~~!?ll..~Ll3:8.~~_e~,_.J17,OO 180.00 .-H~9Q,: ,,'....l.q,9P~...~.:J171.85 ;~nMR...:~:~:i:~::(:.:¡ '~.',,:',::'~,~~,:~":',.~,'_..~~,._..1
.. . . . , , ..
- t:] 'x
æt ~rr@ ~ Rb f\olnm ~~ . Q.S Ni g~ I ~f- ~~ I!Ì!J i ~ 6.11 ~. ,..'(.. » }@f¡@ IZ(] La I¡; !I! fi' ~~ % I1i 8ft ! ;\f ~~ I [èJ I (t1. (~{ I~ ,.K I 8! )
Plan: Plan #3_O80 (S-17ALl/S-17B Plan 8) Plan: Plan #8_O80 (S-17ALl/S-17B Plan 8)
.._,~e__ct_i_o,n Y_i_ew___- .. -------_. - '---' - ----- -- ---- -- ,- ---- ,,_I!!I.. ,[!J-,- 13.,-
Ii
Õ
~
...
::>
~
I I ¡I. i
-~ - \ - --1---+- --l--- .. :-,-_.t-
~ 'd---~--~ ~-~-
,¡, '"~ . -'T~+;..,¡:' '~"¡I;~+..t-:
i I I I : ¡
,.1. j... -I . .;,. . ¡ .. . .
¡ , I : i
i ' .. ¡, '.:'." i :
~~
,--)ollie
.200
2QO
+00
000
1000
100
VclUCù Section 4 335,00- 111.1
~.",ß.} ~," '- ,':_'.f ",; ¿',."","',":.'..::_i.~ -.Ii,' \,~;...:'-:_;t ~.../:~_:;-','-~ ~-,1'_\:.:'-p,.'t_¿\: ',i:_'i§,','S;: :;;'}:.',£I...: ;:: ~T!;: \_i;/:,,_:, ii;;.: \;;t_;,.~.i ;~;/.!-i i,:i' [2 ;j{*~:';.;',i;_~_' S~-¿~);.¡,:_¡_\{: 1~i'_" :,:.!'):';S_: i.:.},; :t.,':
I t ¡
- ~ _..~-
., I I
, + I
li- ~¡'
" 7BtJ8 ..., -
, I
. .. - "'" ...'
I I I
-~ I
-,,- ~--,- ...-- ,-------..."-- _,_1___,__"
-....J
: I
I ' I I .
I I I
. . I
,1--...--,~, -,..j-------..+--,.. ---
! . I ' !
I I I
¡ !
. I
I
7B1I
'+fO .) 0 -)r
I
I
. ., 1. .. I . .
I I
I
. .. . '. ..
:
, ¡
I
I
,
-2'f°
. ~ ¡
... . I \ .. ---. 'I ' ...,
I I
I
I
¡
I
.. - ~ . . -"'~ ..
lhO
1000
1100
1800
West(-)/East(-» [ß]
...
Ready /Uiîit" System: ÃPJ Bãšed -- [Ai)õ1;"Sidëg -- tDëiPthS:1t'-- fMãp: f~
~5tðrtllj ~ ø ~ ¡ ]_~Inb...I~ (jJ20...II~co-- .CF... J~ ,1~1- ..,I1~l~:~J.:t"Jca...1 IjDesktop» rïiifIj. ~lg~.J~SÑ A:" 't:38PM
tA (
,
--
~
~
---
.1)
~
-...t:.
~,
BP Amoco (
Planning Report - Geographic
Company: BP Amoco
Field: Prudhoe Bay
Site: PB S Pad
Well: S-HAL 1
Wellpath: S-17B Plan 9
Section 2: Start DLS 18.00 TFO 290.00
Date: 7/18/2001 Time: 10:41 :35 Page:
Co-ordinate(NE) Reference: Well: S-17 AL 1, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: User (-165.61 N,-2520.23E,335.00Azi)
Plan: Plan #9
2
MD Inel Azim TVD +N/-S +FJ-W VS DLS Build Turn TFO
ft deg deg ft ft ft ft deg/1 OOft deg/1 OOft deg/100ft deg
9475.00 42.11 331.56 8679.81 -150.84 -2527.38 16.40 18.00 6.58 -25.24 - 70.00
9500.00 44.01 325.59 8698.09 -136.30 -2536.28 33.35 18.00 7.62 -23.90 -67.17
9525.00 46.21 320.04 8715.73 -122.21 -2546.99 50.64 18.00 8.78 -22.19 -62.80
9550.00 48.65 314.91 8732.65 -108.67 -2559.43 68.18 18.00 9.77 -20.53 -58.88
9575.00 51.30 310.16 8748.73 -95.74 -2573.54 85.85 18.00 10.62 -18.99 -55.41
9600.00 54.14 305.77 8763.88 -83.52 -2589.23 103.56 18.00 11.33 -17.59 -52.35
9625.00 57.12 301.68 8778.00 -72.08 -2606.39 121.18 18.00 11.92 -16.34 -49.69
9650.00 60.22 297.87 8791.00 -61.49 -2624.92 138.61 18.00 12.42 -15.26 -47.38
9675.00 63.43 294.29 8802.80 -51.82 -2644.71 155.74 18.00 12.83 -14.32 -45.40
9700.00 66.72 290.90 8813.34 -43.12 -2665.64 172.47 18.00 13.17 -13.53 -43.71
9704.25 67.29 290.34 8815.00 -41.74 -2669.30 175.26 18.00 13.34 -13.13 -42.28
9725.00 70.08 287.68 8822.54 -35.45 -2687.58 188.69 18.00 13.47 -12.82 -42.06
9750.00 73.50 284.60 8830.36 -28.86 -2710.38 204.30 18.00 13.67 -12.33 -41.09
9775.28 77.00 281 .59 8836.79 -23.32 -2734.19 219.38 18.00 13.84 -11 .90 -40.13
Section 3: Start DLS 18.00 TFO 50.00
MD loCI Azim TVD +N/-S +EI';W VS. DLS,' Build ,Turn, TFO
" ft" deg deg ft ft ft ft ,'deg/tOOft' deg/1 OQft deg/100ft deg
9800.00 79.88 285.05 8841.75 -17.74 -2757.75 234.40 18.00 11.66 14.00 50.00
9825.00 82.83 288.49 8845.50 -10.61 -2781.41 250.86 18.00 11.80 13.75 49.31
9850.00 85.81 291.88 8847.98 -2.02 -2804.75 268.50 18.00 11.90 13.57 48.79
9875.00 88.80 295.25 8849.15 7.96 -2827.63 287.22 18.00 11.96 13.47 48.45
9885.03 90.00 296.60 8849.26 12.35 -2836.66 295.01 18.00 11.98 13.44 48.29
Section 4: Start DLS 18.00 TFO 298.00
IRcl, Azim TVD +N/-S, ofF/.W VS, DLS , Buiid. ,Turn' ,TFO
deg.'., "deg. ft "ft' "ft "ft.' degl1 dOftde~11 OOft deg/100ft. d,'
.,. e,9..
9900.00 91.26 294.22 8849.09 18.77 -2850.17 306.54 18.00 8.45 -15.90 -62.00
9925.00 93.37 290.24 8848.08 28.22 -2873.29 324.88 18.00 8.42 -15.92 -62.03
9950.00 95.46 286.24 8846.16 36.02 -2896.95 341.95 18.00 8.36 -15.99 -62.19
9975.00 97.52 282.22 8843.33 42.13 -2921.02 357.66 18.00 8.25 -16.10 -62.50
9993.17 99.00 279.27 8840.72 45.48 -2938.69 368.16 18.00 8.13 -16.23 -62.95
Section 5: Start DLS 18.00 TFO 94.00
1\1:1> .Iód, Azhn. . .TVD ," . +N~-S. ,"+FJ-}Y' VS " DLS. 'Build, "Turri <, ,r£F(J"
.' .ft cteg ,," deg' 'ft. ~ ,',' ft ft ft . deg!100ft. dåg/100ft, des/100ft" de
., "..g
1 0000.00 98.91 280.51 8839.66 46.64 -2945.33 372.02 18.00 -1.29 18.18 94.00
10025.00 98.56 285.05 8835.86 52.10 -2969.43 387.15 18.00 -1.42 18.15 94.19
1 0050.00 98.15 289.58 8832.22 59.46 -2993.03 403.80 18.00 -1.64 18.12 94.88
10075.00 97.69 294.1 0 8828.78 68.67 -3016.01 421.86 18.00 -1.84 18.08 95.54
10100.00 97.18 298.61 8825.54 79.68 -3038.22 441 .22 18.00 -2.02 18.04 96.16
10125.00 96.63 303.11 8822.54 92.40 -3059.52 461.75 18.00 -2.20 18.00 96.75
10150.00 96.04 307.60 8819.77 106.78 -3079.78 483.34 18.00 -2.36 17.95 97.29
10175.00 95.41 312.07 8817.28 122.71 -3098.87 505.85 18.00 -2.51 17.91 97.78
10198.17 94.80 316.22 8815.21 138.78 -3115.43 527.41 18.00 -2.64 17.88 98.23
Section 6: Start DLS 18.00 TFO 258.00
l\fD. 111ël " AziBi "TV}) +N/~S +Fl~W YS "I>t.S ,Build' Turn '.. l'FO
ft" 'd~g deg ft ft <ft ft deg/1 OÖft.. deg/1 OOft deg/1pOft de~
.. ,
10200.00 94.73 315.89 8815.06 140.09 -3116.70 529.14 18.00 -3.75 -17.67 -102.00
10225.00 93.78 311.48 8813.20 157.31 -3134.72 552.35 18.00 -3.80 -17.64 -102.03
10250.00 92.81 307.08 8811.77 173.1 0 -3154.03 574.83 18.00 -3.89 -17.60 -102.35
10275.00 91.82 302.69 8810.76 187.39 -3174.52 596.44 18.00 -3.96 -17.57 -102.61
10300.00 90.82 298.30 8810.18 200.06 -3196.05 617.03 18.00 -4.00 -17.55 -102.79
10320.42 90.00 294.72 8810.03 209.18 -3214.32 633.01 18.00 -4.02 -17.55 -102.89
(
BP Amoco (
Planning Report - Geographic
Company: BP Amoco
Field: Prudhoe Bay
Site: P8 S Pad
Well: S-17AL 1
Wellpath: S-178 Plan 9
Section 7: Start DLS 18.00 TFO 270.00
Date: 7/18/2001 Time: 10:41 :35 Page:
Co-ordinate(NE) Reference: Well: S-17 AL 1, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: User (-165.61 N,-2520.23E,335.00Azi)
Plan: Plan #9
3
MD Inel Azim TVD +N/-S +F1- W VS DLS Build Turn TFO
ft deg deg ft ft ft ft deg/100ft deg/100ft deg/100ft deg
10325.00 90.00 293.89 8810.03 211.06 -3218.49 636.48 18.00 0.00 -18.00 -90.00
10350.00 90.00 289.39 8810.03 220.28 -3241.73 654.65 18.00 0.00 -18.00 -90.00
10375.00 90.00 284.89 8810.03 227.65 -3265.61 671.42 18.00 0.00 -18.00 -90.00
10400.00 90.00 280.39 8810.03 233.12 -3290.00 686.69 18.00 0.00 -18.00 -90.00
10425.00 90.00 275.89 8810.03 236.65 -3314.74 700.35 18.00 0.00 -18.00 -90.00
10445.42 90.00 272.22 8810.03 238.10 -3335.11 710.27 18.00 0.00 -18.00 -90.00
Section
8 : Start DLS 18.00 TFO 94.00
TYD
ft
8810.04
8810.13
8810.36
8810.72
8811.22
8811.85
8812.60
8813.47
8814.27
DUS Build TUrD
deg/100ftdeg/100ft,de,g/100ft
18.00 -1.26 17.96
18.00 -1.25 17.96
18.00 -1.24 17.96
18.00 -1.23 17.96
18.00 -1.20 17.96
18.00 -1.17 17.97
18.00 -1.13 17.97
18.00 -1.09 17.98
18.00 -1.04 17.98
10450.00
10475.00
10500.00
10525.00
10550.00
10575.00
10600.00
10625.00
10645.42
Section
'MD
,ft
9 : Start DLS 18.00 TFO 135.00
lricl Azim TVD
','deg", deg', "..,ft'""
87.07 308.73 8814.48
83.89 311.93 8816.45
80.74 315.17 8819.80
77.61 318.47 8824.49
75.09 321.22 8829.31
10650.00
10675.00
10700.00
10725.00
10745.42
Section 10: Start DLS 18.00 TFO 280.00
~I) "'~~~....~:~TriD..
1 0750.00 75.23 320.38 8830.49
10775.00 76.08 315.82 8836.68
10800.00 77.00 311.29 8842.51
10825.00 78.01 306.79 8847.92
10835.20 78.44 304.97 8850.00
10850.00 79.08 302.34 8852.89
10875.00 80.22 297.91 8857.38
10900.00 81.42 293.52 8861.37
10925.00 82.66 289.15 8864.83
10950.00 83.95 284.81 8867.75
10975.00 85.27 280.49 8870.10
10995.42 86.37 276.97 8871.59
Section 11 : Start DLS 18.00 TFO 83.00
MI) " Il1cl ' A;ibll.. .' TYJ)
, ft ' ..deg , deg ft "
11000.00 86.47 277.79 8871.87
11025.00 87.03 282.26 8873.29
11050.00 87.61 286.73 8874.46
11075.00 88.21 291.19 8875.37
11100.00 88.82 295.65 8876.02
11125.00 89.43 300.11 8876.40
11148.17 90.00 304.24 8876.52
238.31
240.61
244.85
251.01
259.04
268.90
280.53
293.85
305.93
+N/-S
ft
308.77
324.90
341.96
359.86
375.02
" +N/~S
o~ft
378.45
396.47
413.22
428.59
434.44
442.48
454.82
465.52
474.53
481.77
487.22
490.31
" +N/~S ,
.' ft'
490.90
495.24
501.49
509.61
519.54
531.23
543.56
+F1-W
ft
-3339.68
-3364.57
-3389.20
-3413.42
-3437.08
-3460.04
-3482.15
-3503.28
-3519.72
+EI~W ,"
oft ",
-3523.30
-3542.30
-3560.25
-3577.05
-3589.85
'+FI~W "
ft
-3592.64
-3608.82
-3626.43
-3645.39
-3653.48
-3665.56
-3686.83
-3709.06
-3732.11
-3755.85
-3780.13
-3800.26
+FI-W
ft
-3804.79
-3829.37
-3853.54
-3877.16
-3900.08
-3922.17
-3941.78
712.39
724.99
739.24
755.06
772.34
790.98
810.86
831.86
849.76
.YS
,ft "
853.85
876.50
899.55
922.87
942.02
'YS
"At
946.31
969.48
992.1 0
1014.04
1022.76
1035.16
1055.33
1074.42
1092.32
1108.93
1124.12
1135.43
1137.88
1152.20
1168.08
1185.42
1204.11
1224.04
1243.50
, 'DLS "Build Turn""
,deg/100ft deg/1 OOftdeg/100ft .
18.00 -12.73 12.74
18.00 -12.70 12.80
18.00 -12.62 12.95
18.00 -12.50 13.19
18.00 -12.36 13.47
" ,DLg ,Build Turn,
" deg/1 qOft degJ1 OOft deg/100ft,
18.00 3.16 -18.33
18.00 3.37 -18.25
18.00 3.71 -18.11
18.00 4.02 -17.97
18.00 4.22 -17.87
18.00 4.36 -17.81
18.00 4.56 -17.70
18.00 4.78 -17.58
18.00 4.98 -17.47
18.00 5.15 -17.37
18.00 5.29 -17.28
18.00 5.39 -17.22
, DLS..," Build: " ,Turn, '. "
,deg/tO°ft deg/1 OOftdeg/1 OOft
18.00 2.20 17.90
18.00 2.25 17.89
18.00 2.32 17.87
18.00 2.38 17.85
18.00 2.42 17.84
18.00 2.45 17.83
18.00 2.47 17.83
TFO
deg
94.00
94.00
93.98
93.94
93.88
93.79
93.67
93.54
93.38
TFO
deg
135.00
134.97
134.72
134.29
133.67
"TFO
.'deg'
-80.00
-79.79
-78.65
-77.60
-76.63
- 76.25
-75.74
-74.95
-74.24
-73.64
- 73.13
-72.73
" 'rF()
d
'"" eg
83.00
82.95
82.70
82.49
82.32
82.21
82.14
(
BP Amoco (
Planning Report - Geographic
Company: BP Amoco
Field: Prudhoe Bay
Site: PB S Pad
Well: S-17AL 1
Wellpath: S-17B Plan 9
Section 12: Start DLS 17.00 TFO 180.00
Date: 7/18/2001 Time: 10:41 :35 Page:
Co-ordinate(NE) Reference: Well: S-17 AU, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: User (-165.61N.-2520.23E,335.00Azi)
Plan: Plan #9
4
MD Incl Azim TVD +N/-S +FJ-W VS DLS Build Turn TFO
ft deg deg ft ft ft ft deg/100ft deg/1 OOft deg/100ft deg
11150.00 89.69 304.24 8876.52 544.59 -3943.29 1245.08 17.00 -17.00 0.00 180.00
11175.00 85.44 304.24 8877.58 558.65 -3963.94 1266.53 17.00 -17.00 0.00 180.00
11200.00 81.19 304.24 8880.49 572.61 -3984.46 1287.87 17.00 -17.00 0.00 180.00
11223.95 77.12 304.24 8885.00 585.85 -4003.90 1308.08 17.00 -17.00 0.00 180.00
11225.00 76.94 304.24 8885.24 586.42 -4004.74 1308.96 17.00 -17.00 0.00 180.00
11250.00 72.69 304.24 8891.78 600.00 -4024.68 1329.68 17.00 -17.00 0.00 180.00
11275.00 68.44 304.24 8900.10 613.26 -4044.17 1349.94 17.00 -17.00 0.00 180.00
11300.00 64.19 304.24 8910.14 626.14 -4063.09 1369.61 17.00 -17.00 0.00 180.00
11320.00 60.79 304.24 8919.38 636.12 -4077.75 1384.85 17.00 -17.00 0.00 180.00
Map Map <:---- Latitude ----> <~-- Longitude --->
MD Incl Azim TVD +N/..S +FJ-W Northing Easting Deg Min Sec Deg Min Sec
ft deg deg ft ft ft ft ft
9450.00 39.12 335.35 8660.95 -165.61 -2520.24 5979073.44 616367.92 70 21 5.725 N 149 3 18.521 W
9460.00 41.12 335.35 8668.60 -159.75 -2522.92 5979079.26 616365.14 70 21 5.783 N 149 3 18.599 W
9475.00 42.11 331.56 8679.81 -150.84 -2527.38 5979088.09 616360.55 70 21 5.870 N 149 3 18.729 W
9500.00 44.01 325.59 8698.09 -136.30 -2536.28 5979102.49 616351.41 70 21 6.013 N 149 3 18.990 W
9525.00 46.21 320.04 8715.73 -122.21 -2546.99 5979116.40 616340.48 70 21 6.152 N 149 3 19.303 W
9550.00 48.65 314.91 8732.65 -108.67 -2559.43 5979129.75 616327.83 70 21 6.285 N 149 3 19.667 W
9575.00 51.30 310.16 8748.73 -95.74 -2573.54 5979142.45 616313.51 70 21 6.412 N 149 3 20.079 W
9600.00 54.14 305.77 8763.88 -83.52 -2589.23 5979154.42 616297.64 70 21 6.532 N 149 3 20.538 W
9625.00 57.12 301.68 8778.00 -72.08 -2606.39 5979165.58 616280.30 70 21 6.644 N 149 3 21 .039 W
9650.00 60.22 297.87 8791.00 -61.49 -2624.92 5979175.87 616261.60 70 21 6.749 N 149 3 21.581 W
9675.00 63.43 294.29 8802.80 -51.82 -2644.71 5979185.23 616241.66 70 21 6.844 N 149 3 22.160 W
9700.00 66.72 290.90 8813.34 -43.12 -2665.64 5979193.60 616220.60 70 21 6.929 N 149 3 22.772 W
9704.25 67.29 290.34 8815.00 -41.74 -2669.30 5979194.92 616216.92 70 21 6.943 N 149 3 22.879 W
9725.00 70.08 287.68 8822.54 -35.45 -2687.58 5979200.92 616198.55 70 21 7.004 N 149 3 23.413 W
9750.00 73.50 284.60 8830.36 -28.86 -2710.38 5979207.15 616175.64 70 21 7.069 N 149 3 24.079 W
9775.28 77.00 281.59 8836.79 -23.32 -2734.19 5979212.30 616151.76 70 21 7.124 N 149 3 24.775 W
9800.00 79.88 285.05 8841.75 -17.74 -2757.75 5979217.51 616128.11 70 21 7.178 N 149 3 25.464 W
9825.00 82.83 288.49 8845.50 -10.61 -2781.41 5979224.27 616104.34 70 21 7.248 N 149 3 26.155 W
9850.00 85.81 291.88 8847.98 -2.02 -2804.75 5979232.48 616080.87 70 21 7.333 N 149 3 26.838 W
9875.00 88.80 295.25 8849.15 7.96 -2827.63 5979242.10 616057.83 70 21 7.431 N 149 3 27.507 W
9885.03 90.00 296.60 8849.26 12.35 -2836.66 5979246.34 616048.74 70 21 7.474 N 149 3 27.770 W
9900.00 91.26 294.22 8849.09 18.77 -2850.17 5979252.55 616035.13 70 21 7.537 N 149 3 28.166 W
9925.00 93.37 290.24 8848.08 28.22 -2873.29 5979261.63 616011.87 70 21 7.630 N 149 3 28.841 W
9950.00 95.46 286.24 8846.16 36.02 -2896.95 5979269.05 615988.08 70 21 7.707 N 149 3 29.533 W
9975.00 97.52 282.22 8843.33 42.13 -2921.02 5979274.77 615963.92 70 21 7.767 N 149 3 30.237 W
9993.17 99.00 279.27 8840.72 45.48 -2938.69 5979277.85 615946.21 70 21 7.799 N 149 3 30.753 W
10000.00 98.91 280.51 8839.66 46.64 -2945.33 5979278.90 615939.54 70 21 7.811 N 149 3 30.947 W
10025.00 98.56 285.05 8835.86 52.10 -2969.43 59792'83.98 615915.37 70 21 7.864 N 149 3 31.651 W
10050.00 98.15 289.58 8832.22 59.46 -2993.03 5979290.97 615891.65 70 21 7.937 N 149 3 32.341 W
10075.00 97.69 294.1 0 8828.78 68.67 -3016.01 5979299.81 615868.53 70 21 8.027 N 149 3 33.013 W
10100.00 97.18 298.61 8825.54 79.68 -3038.22 5979310.46 615846.15 70 21 8.135 N 149 3 33.662 W
10125.00 96.63 303.11 8822.54 92.40 -3059.52 5979322.84 615824.66 70 21 8.260 N 149 3 34.285 W
10150.00 96.04 307.60 8819.77 106.78 -3079.78 5979336.89 615804.17 70 21 8.402 N 149 3 34.877 W
10175.00 95.41 312.07 8817.28 122.71 -3098.87 5979352.52 615784.83 70 21 8.558 N 149 3 35.436 W
10198.17 94.80 316.22 8815.21 138.78 -3115.43 5979368.32 615768.02 70 21 8.716 N 149 3 35.920 W
10200.00 94.73 315.89 8815.06 140.09 -3116.70 5979369.61 615766.73 70 21 8.729 N 149 3 35.957 W
10225.00 93.78 311.48 8813.20 157.31 -3134.72 5979386.54 615748.44 70 21 8.898 N 149 3 36.484 W
10250.00 92.81 307.08 8811.77 173.1 0 -3154.03 5979402.03 615728.88 70 21 9.054 N 149 3 37.048 W
10275.00 91.82 302.69 8810.76 187.39 -3174.52 5979415.98 615708.17 70 21 9.194 N 149 3 37.647 W
10300.00 90.82 298.30 8810.18 200.06 -3196.05 5979428.32 615686.44 70 21 9.319 N 149 3 38.277 W
10320.42 90.00 294.72 8810.03 209.18 -3214.32 5979437.14 615668.03 70 21 9.408 N 149 3 38.811 W
t
BP Amoco (,
Planning Report - Geographic
Company: BP Amoco
Field: Prudhoe Bay
Site: PB S Pad
Well: S-17AL 1
Wellpath: S-17B Plan 9
Date: 7/18/2001 Time: 10:41 :35 Page:
Co-ordinate(NE) Reference: Well: 5-17 AL 1, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: User (-165.61N,-2520.23E,335.00Azi)
Plan: Plan #9
5
Survey
Map Map <---- Latitude ----> <--- Longitude --->
MD Incl Azim TVD +N/-S +Fl-W Northing Easting Deg Min Sec Deg Min Sec
ft deg deg ft ft ft ft ft
10325.00 90.00 293.89 8810.03 211.06 -3218.49 5979438.95 615663.83 70 21 9.427 N 149 3 38.933 W
10350.00 90.00 289.39 8810.03 220.28 -3241.73 5979447.80 615640.46 70 21 9.517 N 149 3 39.612 W
10375.00 90.00 284.89 8810.03 227.65 -3265.61 5979454.79 615616.46 70 21 9.590 N 149 3 40.310 W
10400.00 90.00 280.39 8810.03 233.12 -3290.00 5979459.87 615591.99 70 21 9.643 N 149 3 41.023 W
10425.00 90.00 275.89 8810.03 236.65 -3314.74 5979463.02 615567.20 70 21 9.678 N 149 3 41.746 W
10445.42 90.00 272.22 8810.03 238.10 -3335.11 5979464.14 615546.81 70 21 9.692 N 149 3 42.342 W
10450.00 89.94 273.04 8810.04 238.31 -3339.68 5979464.27 615542.24 70 21 9.694 N 149 3 42.475 W
10475.00 89.63 277.53 8810.13 240.61 -3364.57 5979466.18 615517.32 70 21 9.717 N 149 3 43.203 W
10500.00 89.32 282.02 8810.36 244.85 -3389.20 5979470.03 615492.63 70 21 9.758 N 149 3 43.923 W
10525.00 89.01 286.51 8810.72 251.01 -3413.42 5979475.80 615468.31 70 21 9.819 N 149 3 44.631 W
10550.00 88.71 291.00 8811.22 259.04 -3437.08 5979483.46 615444.53 70 21 9.898 N 149 3 45.322 W
10575.00 88.42 295.49 8811.85 268.90 -3460.04 5979492.95 615421.42 70 21 9.995 N 149 3 45.994 W
10600.00 88.13 299.98 8812.60 280.53 -3482.15 5979504.22 615399.13 70 21 10.109 N 149 3 46.640 W
10625.00 87.86 304.48 8813.47 293.85 -3503.28 5979517.21 615377.79 70 21 10.240 N 149 3 47.258 W
10645.42 87.65 308.15 8814.27 305.93 -3519.72 5979529.02 615361.16 70 21 10.359 N 149 3 47.738 W
10650.00 87.07 308.73 8814.48 308.77 -3523.30 5979531.81 615357.54 70 21 10.386 N 149 3 47.843 W
10675.00 83.89 311.93 8816.45 324.90 -3542.30 5979547.63 615338.29 70 21 10.545 N 149 3 48.399 W
10700.00 80.74 315.17 8819.80 341.96 -3560.25 5979564.41 615320.07 70 21 10.713 N 149 3 48.924 W
10725.00 77.61 318.47 8824.49 359.86 -3577.05 5979582.03 615302.99 70 21 10.889 N 149 3 49.415 W
10745.42 75.09 321.22 8829.31 375.02 -3589.85 5979596.99 615289.95 70 21 11.038 N 149 3 49.789 W
10750.00 75.23 320.38 8830.49 378.45 -3592.64 5979600.38 615287.10 70 21 11.071 N 149 3 49.871 W
10775.00 76.08 315.82 8836.68 396.47 -3608.82 5979618.13 615270.65 70 21 11.249 N 149 3 50.344 W
10800.00 77.00 311.29 8842.51 413.22 -3626.43 5979634.60 615252.77 70 21 11.413 N 149 3 50.859 W
10825.00 78.01 306.79 8847.92 428.59 -3645.39 5979649.66 615233.58 70 21 11.564 N 149 3 51.413 W
10835.20 78.44 304.97 8850.00 434.44 -3653.48 5979655.39 615225.39 70 21 11.622 N 149 3 51.650 W
10850.00 79.08 302.34 8852.89 442.48 -3665.56 5979663.23 615213.19 70 21 11.701 N 149 3 52.003 W
10875.00 80.22 297.91 8857.38 454.82 -3686.83 5979675.23 615191.73 70 21 11.822 N 149 3 52.625 W
10900.00 81.42 293.52 8861.37 465.52 -3709.06 5979685.58 615169.33 70 21 11.927 N 149 3 53.275 W
10925.00 82.66 289.15 8864.83 474.53 -3732.11 5979694.22 615146.14 70 21 12.016 N 149 3 53.949 W
10950.00 83.95 284.81 8867.75 481.77 -3755.85 5979701.09 615122.29 70 21 12.087 N 149 3 54.643 W
10975.00 85.27 280.49 8870.10 487.22 -3780.13 5979706.15 615097.93 70 21 12.140 N 149 3 55.353 W
10995.42 86.37 276.97 8871.59 490.31 -3800.26 5979708.92 615077.76 70 21 12.171 N 149 3 55.941 W
11000.00 86.47 277.79 8871.87 490.90 -3804.79 5979709.43 615073.22 70 21 12.176 N 149 3 56.073 W
11025.00 87.03 282.26 8873.29 495.24 -3829.37 5979713.38 615048.58 70 21 12.219 N 149 3 56.792 W
11050.00 87.61 286.73 8874.46 501.49 -3853.54 5979719.25 615024.31 70 21 12.280 N 149 3 57.498 W
11075.00 88.21 291.19 8875.37 509.61 -3877.16 5979726.99 615000.57 70 21 12.360 N 149 3 58.189 W
11100.00 88.82 295.65 8876.02 519.54 -3900.08 5979736.55 614977.49 70 21 12.457 N 149 3 58.859 W
11125.00 89.43 300.11 8876.40 531.23 -3922.17 5979747.89 614955.22 70 21 12.572 N 149 3 59.505 W
11148.17 90.00 304.24 8876.52 543.56 -3941.78 5979759.91 614935.42 70 21 12.694 N 149 4 0.078 W
11150.00 89.69 304.24 8876.52 544.59 -3943.29 5979760.92 614933.89 70 21 12.704 N 149 4 0.123 W
11175.00 85.44 304.24 8877.58 558.65 -3963.94 5979774.64 614913.03 70 21 12.842 N 149 4 0.726 W
11200.00 81.19 304.24 8880.49 572.61 -3984.46 5979788.28 614892.29 70 21 12.979 N 149 4 1 .326 W
11223.95 77.12 304.24 8885.00 585.85 -4003.90 5979801.20 614872.64 70 21 13.109 N 149 4 1 .895 W
11225.00 76.94 304.24 8885.24 586.42 -4004.74 5979801.76 614871.79 70 21 13.115 N 149 4 1.919 W
11250.00 72.69 304.24 8891.78 600.00 -4024.68 5979815.02 614851.64 70 21 13.248 N 149 4 2.502 W
11275.00 68.44 304.24 8900.10 613.26 -4044.17 5979827.97 614831.95 70 21 13.378 N 149 4 3.072 W
11300.00 64.19 304.24 8910.14 626.14 -4063.09 5979840.54 614812.83 70 21 13.505 N 149 4 3.625 W
11320.00 60.79 304.24 8919.38 636.12 -4077.75 5979850.29 614798.01 70 21 13.603 N 149 4 4.054 W
I(
BP Amoco 1(
Planning Report - Geographic
Company: BP Amoco
Field: Prudhoe Bay
Site: PB S Pad
Well: S-17AL 1
Wellpath: 8-17B Plan 9
Targets
Date: 7/18/2001 Time: 10:41:35 Page:
Co-ordinate(NE) Reference: Well: 8-17 AL 1, True North
Vertical (TVD) Reference: System: Mean Sea Level
Section (VS) Reference: User (-165.61N,-2520.23E,335.00Azi)
Plan: Plan #9
6
Name
Description
Map Map <---- Latitude ----> <... Longitude --->
TVD +N/-S +FJ- W Northing Easting Deg Min Sec Deg Min Sec
ft ft ft ft ft
8815.00 426.24 -3504.02 5979649.56 615374.95 70 21 11.542 N 149 3 47.281 W
8850.00 141.26 -2873.37 5979374.64 616009.99 70 21 8.742 N 149 3 28.845 W
8885.00 659.50 -4025.45 5979874.50 614849.92 70 21 13.833 N 149 4 2.526 W
S17Bt4.10
817B t2.10
S17Btd.10
(
{
DATE
07/06/01
CHECK NO.
00193317
H 19331.7
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
NET
070201 CKO70201D
PYMT OMMENTS:
HANDL NG INST:
100.00
100.00
Per it to Drill ee
5tH - Terrie Hub Ie X4628 or
Sandra Ste man X4750
~- \ 7 B
~HE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND,. OHIO
18,3317
CONSOLIDATED COMMERCIAL ACCOUNT
'.' r:.
....':--
. .
d~E.'HU~DRED & 00/ 1 OQ~'**~************i~*~:it,~~**~********** d~ D,~LLAR
<, ."
. ".'
',.'.:'.: .,..,t)AT8<o'.JxMOlJNT:. , ' <
~~ l~~l 0 1);:1/1;;\1;::,1; < ' ;¡¡ . ":~;10~;.~+
.:: NqTVALlP~FTEFd2Ò..DAYS\.: ",.'.." '.: ."
56"389
~.
PAY
""""'.
"'"
To The
ORDER
Of
':~g~:!~ ~¡¥~~~~ï~~~~ ~S:ï9~I'Ì
SU I TE lèO> ". :" " .
ANCHORAgre
.. ... ~,. .
tlJJp~~'1,;
.,:..,',
AK 99501
III ~ Ii ~ ~ ~ ? III I: 0... ~ 2 0 ~ a 11 5 I: 0 0 a ...... ~ q III
CHECK 1
STANDARD LETTER
DEVELOPMENT
DEVELOPMENT
RED RILL
EXPLORATION
INJECTION WELL
INJECTION WELL
REDRILL
(
1\,
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERJP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
ANNUL~
ANNULAR DISPOSAL
<--> YES
ANNULAR DISPOSAL
THIS WELL
fl5!/ 3 ~ /76
"CLUE"
The permit is for a new well bore segment of existing well
. Permit No, API No. .
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(t), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . .
ANNULUS
<--> YES +
SPACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved' subject to
full compliance with 20 AAC 25.055. Approval to peñorate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Companv Name) will assume the liability of any protest to
the spacing exception that may occur.
APPR
.t¿
COMPANY WELL NAME6"" / 7 B PROGRAM: exp - dev - redrll serv well bore sag _ann. disposal para req -
INIT CLASS"""'V I -- GEOL AREA J UNIT# (')/1 t?S-6 ON/OFF SHORE (jy¡
1.Pennitfeeattached....................... QN '" 1:
~: t~:en=~~:::n~~~:;;b~r::. '- '. -- '. .. '. .. '. '. '. '. -. '. '. '. '~ 1:k~ ~ J 0 ::::: ~ i::t 2;:M z ::S1z~ t~~~c I-c K-
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y , N
5. Well located proper distance from drilling unit boundary. . . . N
6. Well located proper distance from other wells.. . . . . . . . . N
7. Sufficent acreage available' in drilling unit.. . . . . . . . . . . ;'\, N.
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . j N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Pennit can be issued without conservation order. . . . . . . . N
12. Pennit can.be issued without administrative approval.. . . . . N
13. Can permit be approved before 15-day wait.. . . . . . . . . . N
14. Conductor string provided. . . . . . . . .. . . . . . . . . . &; N"1 .
~~: ~~~~r::~~~gt,:~~II:;O: ~~~':~r & ~urt ;";g: : : : : ~ ~ ) <;'~"GL ~ ~ L~\ ~ ~ "\. I>$.. \ \
17. CMT vol adequate to tie-in long string to suñ csg. . . . . . . . y~ N
18. CMT will cover all known productive horizons. . . . . '. . . . . ~ N
19. Casing designs adequate for C, T. 8 & permafrost. . . . . . . ffi N ....
~~: ~~::~I~~~a~~ ~~':~~:;.d~n;"~rrt ¡'~e~ ~pp;o~';'¡: : : y ~ - ~~~::.I ~ co rt ~ ~~<i.. ~ ,+
22. Adequate well bore separation proposed.. . . . . . . . . . . . ø N
23. If diverter required, does it meet regulations. . . . . . . . . . Y N.)...J~
24. Drilling .fluid program schematic & equip list adequate. . . . . I N
. Qð TE . ~~: ~g=~Spr:.:".:==~~~~:nt~sÌt~ . . . . '?, q)6' ~s¡g: ~ ~'?\' €"?-'¡~~?) ~ ~~ 'j, ~'!
~.JlA 27. Choke manifold complies w/API RP-53 (May 84)'". . . . . . . . N
28. Work will occur without operation shutdown. . . . . . . . . . . N. " ~" \. .
29. IspresenceofHoSgasprobable................. ~~ \\d<:"">""'\'Y'~\'1);~'~"'<;'" ~\"~~d$/ê."s.a~",~o\<\"¡:-'~'
~: ~=::':'~S~~~":.'~i~r:,~~~~~~ez:~::u.r~s.. ........ ~ - 3D~ ~ /?1Lf~v '~ ? 2~, V/O I
32. Seismic anal~~is of shallo~ gas zones. . . . . . . . ~. . . '. ~ ,N. ' ,
DATE 33. Seabed condition survey (If off-shore). . . . . . . . . ... Y N ,
7- f c¡ . D/ 34. Contact name/phone for weekly progress reports [expl atoty only] Y N . ,
A NULAR DISPOSAL35. With proper cementing records, this plan .
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate frèshwater; or cause drilling waste. ..
to surface;" "
(C) will not impair mechanical integrity of the well used for disposal; Y N
(0) will not damage producing formation or impair recovery from a Y N
pool; and
,,'
E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING:' UIC/Annular COMMISSION:
wr:x------ '8~s Ú)T
~¡; - JMH
WELL PERMIT CHECKLIST
FIELD & POOL
ADMINISTRA TION
AP DATj:.
7/'/ eO/
ENGINEERING
c
0
Z
0
-4
:E
:;0
("
-
-4'
m
-
Z
-4
.:I:
GEOLOGY
-
DATE
Y N
Y N
.~~
en
:Þ
::a
m
»
(
,--
~Þ8*
Com ments/lnstructions:
c:\msoffice\wordian\diana\checklist (rev. 11/011100)
'1
i
~
Well History File
APPENDIX
Information of detailed nature that is not
particularly gennane to the Well Permitting Process
but is part of the history file. .
To improve the readability of the Well History file and to
simplify finding information, infonnation of this
nature is accumulated at the end of the file under APPENDIX.
No special "effort has been made to chronologically
, .
organize this category of information.
1
("
I~
cXO/-11./5
I J54ft:;
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Feb 26 15:56:11 2003
Reel Header
Service name........... ..LISTPE
Date.....................03/02/26
Origin...................STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS
Writing Library.
Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date.....................03/02/26
Origin...................STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing
Library.
Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
PSI-01
500292310400
BP Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
26-FEB-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 1
AK-MW-22123
J. BOBBITT
D. FERGUSON
MWDRUN 2
AK-MW-22123
J. BOBBITT
D. FERGUSON
MWDRUN 3
AK-MW-22123
J. BOBBITT
B. DECKER
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
15
11N
15E
3800
4579
.00
51.05
17.60
#
WELL CASING RECORD
1ST STRING
2ND STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
16.000 20.000 113.0
12.250 13.375 5108.0
(
(
3RD STRING
PRODUCTION STRING
8.500
9.625
9289.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2.
ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY
(DGR), UTILIZING
GEIGER-MUELLER TUBE DETECTORS.
4. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR;
ELECTROMAGNETIC WAVE RESISTIVITY
PHASE-4 (EWR4); AND PRESSURE WHILE DRILLING (PWD).
5. MWD RUN 3 COMPRISED DIRECTIONAL WITH DGR; EWR4;
COMPENSATED NEUTRON
POROSITY (CNP); AND STABILIZED LITHO-DENSITY (SLD).
DUE TO A TOOL FAILURE,
NO RESISTIVITY DATA WERE ACQUIRED FOR THIS RUN.
6. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED
TO A SCHLUMBERGER
CASED-HOLE GAMMA RAY LOG RUN IN PSI-01 ON 5 AUGUST
2002. LOG HEADER DATA
RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA
WERE PROVIDED BY
DEWAYNE SCHNORR ON 12 NOVEMBER 2002.
7. MWD RUNS 1 - 3 REPRESENT WELL PSI-01 WITH API#:
50-029-23104-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
9735'MD/8663'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SPSF = SMOOTHED NEUTRON POROSITY (SANDSTONE MATRIX,
FIXED HOLE SIZE).
SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE.
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN) .
SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN).
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW-COUNT BIN) .
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: 8.5"
MUD WEIGHT: 9.05 - 9.1 PPG
MUD SALINITY: 14,000 PPM CHLORIDES
(
(
50,000 PPM CHLORIDES
FORMATION WATER SALINITY:
FLUID DENSITY: 1.0 GICC
MATRIX DENSITY: 2.65 GICC
LITHOLOGY: SANDSTONE
$
File Header
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/26
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
NCNT
FCNT
NPHI
PEF
DRHO
RHOB
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
221.0
276.0
5101.0
5101.0
5101.0
5101.0
5101.0
9218.5
9218.5
9218.5
9286.5
9286.5
9286.5
STOP DEPTH
9697.0
9733.5
9256.5
9256.5
9256.5
9256.5
9256.5
9648.5
9648.5
9648.5
9658.0
9658.0
9658.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ------
BASELINE
221.0
8913.0
8925.5
8943.0
8947.5
8967.5
8985.0
8996.5
9006.0
9014.5
9029.5
9033.0
9039.0
9049.0
9051.5
9052.5
9069.5
9087.0
9089.0
9093.0
9109.5
9111.5
9120.0
DEPTH
GR
220.5
8912.5
8926.0
8943.0
8946.5
8966.0
8984.5
8995.5
9005.0
9013.5
9028.5
9031.5
9038.5
9048.5
9051.0
9052.5
9069.0
9086.0
9089.5
9092.5
9108.5
9110.5
9119.5
('
{
9125.0
9130.5
9147.0
9164.0
9166.5
9174.5
9179.5
9189.5
9207.0
9212.0
9214.0
9220.0
9223.0
9225.5
9227.0
9230.5
9234.0
9243.0
9249.0
9254.0
9256.5
9268.0
9269.5
9272.0
9273.0
9278.5
9281.5
9286.5
9288.5 .
9294.5
9302.0
9308.0
9317.5
9329.0
9333.5
9365.0
9368.0
9392.5
9411.0
9412.5
9419.5
9433.0
9441.5
9445.0
9459.5
9466.5
9469.0
9476.0
9479.0
9482.0
9486.5
9488.5
9515.5
9523.5
9530.5
9537.5
9541.5
9544.0
9546.5
9553.5
9555.5
9560.5
9565.0
9567.5
9571.5
9124.5
9129.5
9147.0
9162.5
9165.5
9173.5
9178.5
9188.5
9206.0
9210.5
9212.5
9219.0
9222.0
9224.5
9226.0
9229.5
9233.0
9241.5
9247.5
9252.5
9255.0
9266.5
9268.5
9270.5
9273.0
9280.5
9284.0
9288.5
9290.5
9296.5
9304.0
9309.5
9319.0
9330.5
9335.0
9367.0
9369.5
9392.5
9412.0
9413.5
9420.0
9433.0
9442.0
9445.0
9459.5
9467.0
9469.5
9475.0
9477.5
9482.5
9486.0
9488.0
9514.5
9523.5
9530.5
9537.5
9541.0
9544.0
9546.0
9552.5
9555.0
9560.0
9563.5
9567.5
9570.5
(
9574.0
9579.5
9585.5
9591.5
9603.0
9606.5
9613.0
9617.0
9623.5
9627.0
9630.5
9631.5
9634.0
9641.0
9644.5
9648.5
9649.5
9652.0
9657.0
9733.5
$
9573.5
9578.5
9584.5
9590.5
9602.0
9605.5
9613.0
9617.0
9623.5
9627.0
9631.0
9633.0
9635.5
9642.5
9647.0
9650.0
9651.5
9654.0
9658.5
9735.0
#
MERGED DATA
PBU TOOL
MWD
MWD
MWD
$
SOURCE
CODE
BIT RUN NO
1
2
3
MERGE TOP
220.5
5125.5
9300.0
MERGE BASE
5125.5
9300.0
9735.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units......... ..Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CNTS 4 1 68 36 10
NCNT MWD CNTS 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD BARN 4 1 68 52 14
Name Service Unit
DEPT FT
Min
221
Max
9733.5
Mean Nsam
4977.25 19026
{
First
Reading
221
Last
Reading
9733.5
i i
( (
ROP MWD FT/H 0.18 848.37 195.858 18915 276 9733.5
GR MWD API 12.88 395.04 69.1852 18953 221 9697
RPX MWD OHMM 0.13 33.72 2.80348 8312 5101 9256.5
RPS MWD OHMM 0.1 1063.9 2.9707 8312 5101 9256.5
RPM MWD OHMM 0.08 1559.41 3.2174 8312 5101 9256.5
RPD MWD OHMM 0.1 1704.87 3.64476 8312 5101 9256.5
FET MWD HOUR 0.0764 90.2153 1.17873 8312 5101 9256.5
NPHI MWD PU-S 9.94 81.76 29.9097 861 9218.5 9648.5
FCNT MWD CNTS 416.25 1460.14 876.244 861 9218.5 9648.5
NCNT MWD CNTS 2203.92 4197.64 3295.78 861 9218.5 9648.5
RHOB MWD G/CM 1.938 3.105 2.2889 744 9286.5 9658
DRHO MWD G/CM -0.099 0.81 0.0320202 744 9286.5 9658
PEF MWD BARN 1.55 7 2.3681 744 9286.5 9658
First Reading For Entire File........ ..221
Last Reading For Entire File.......... .9733.5
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/26
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/26
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
220.5
275.5
STOP DEPTH
5069.0
5125.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
26-JUL-02
Insite
66.37
Memory
5125.0
220.0
5125.0
(
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD010
GR MWD010
.0
36.0
TOOL NUMBER
142827
16.000
113.0
SPUD
9.35
142.0
9.2
1100
9.0
.000
.000
.000
.000
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
(
.0
91.0
.0
.0
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 220.5 5125.5 2673 9811 220.5 5125.5
ROP MWD010 FT/H 0.44 848.37 205.238 9701 275.5 5125.5
GR MWD010 API 14.24 107.99 51.509 9698 220.5 5069
First Reading For Entire File......... .220.5
Last Reading For Entire File.......... .5125.5
('
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/26
Maximum Physical Record..65535
File Type..... .......... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/26
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
3
(
header data for each bit run in separate files.
2
.5000
START DEPTH
5069.5
5100.5
5100.5
5100.5
5100.5
5100.5
5126.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
#
STOP DEPTH
9262.5
9255.0
9255.0
9255.0
9255.0
9255.0
9300.0
01-AUG-02
Insite
66.37
Memory
9300.0
5125.0
9300.0
17.9
35.2
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
TOOL NUMBER
066093
081797
12.250
('
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
(
5108.0
LSND
10.35
54.0
9.2
700
2.8
2.100
1.110
2.250
2.600
66.0
131.0
66.0
66.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5069.5 9300 7184.75 8462 5069.5 9300
ROP MWD020 FT/H 0.18 651.51 199.957 8349 5126 9300
GR MWD020 API 12.88 395.04 89.5894 8387 5069.5 9262.5
RPX MWD020 OHMM 0.13 33.72 2.80248 8310 5100.5 9255
RPS MWD020 OHMM 0.1 1063.9 2.96966 8310 5100.5 9255
RPM MWD020 OHMM 0.08 1559.41 3.21646 8310 5100.5 9255
RPD MWD020 OHMM 0.1 1704.87 3.64389 8310 5100.5 9255
FET MWD020 HOUR 0.0764 90.2153 1.17859 8310 5100.5 9255
First Reading For Entire File......... .5069.5
Last Reading For Entire File.......... .9300
(
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.. .... .03/02/26
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/26
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
GR
DRHO
RHOB
PEF
ROP
$
4
(
header data for each bit run in separate files.
3
.5000
START DEPTH
9217.5
9217.5
9217.5
9263.0
9288.5
9288.5
9288.5
9300.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CNP
SLD
$
STOP DEPTH
9650.0
9650.0
9650.0
9698.5
9659.5
9659.5
9659.5
9735.0
05-AUG-02
Insite
66.37
Memory
9735.0
9300.0
9735.0
15.5
17.8
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
STABILIZED LITHO DEN
TOOL NUMBER
124725
160816
78940
67985
#
(
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
(
8.500
9289.0
LSND
9.10
47.0
910.0
14000
3.2
.250
.120
.220
.280
73.0
156.0
73.0
73.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
NPHI MWD030 PU-S 4 1 68 12 4
FCNT MWD030 CNTS 4 1 68 16 5
NCNT MWD030 CNTS 4 1 68 20 6
RHOB MWD030 G/CM 4 1 68 24 7
DRHO MWD030 G/CM 4 1 68 28 8
PEF MWD030 BARN 4 1 68 32 9
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9217.5 9735 9476.25 1036 9217.5 9735
ROP MWD030 FT/H 1.13 448 51.7845 870 9300.5 9735
GR MWD030 API 16.82 336.62 69.87 872 9263 9698.5
NPHI MWD030 PU-S 9.94 81.76 30.2249 866 9217.5 9650
FCNT MWD030 CNTS 416.25 1460.14 872.924 866 9217.5 9650
NCNT MWD030 CNTS 2203.92 4197.64 3288.51 866 9217.5 9650
RHOB MWD030 GICM 1.938 3.105 2.28845 743 9288.5 9659.5
DRHO MWD030 GICM -0.099 0.81 0.0318048 743 9288.5 9659.5
PEF MWD030 BARN 1.55 7 2.36526 743 9288.5 9659.5
..
(
First Reading For Entire File......... .9217.5
Last Reading For Entire File.......... .9735
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation. ...,. .03/02/26
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date.....................03/02/26
Origin...................STS
Tape Name.......... ..... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS
Writing Library.
Reel Trailer
Service name............ .LISTPE
Date.....................03/02/26
Origin...................STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS
Writing Library.
Physical EOF
Physical EOF
End Of LIS File
('
Scientific Technical Services
Scientific Technical Services
(
~
\
dOJ-NS
/oo,~
. .
* * * * REEL HEADER * *.* *
MWD
02/05/31
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
02/05131
188780
01
1.75" NaviGamma - Gamma Ray
*** LIS COMMENT RECORD ***
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
Remark File Version 1.000
Extract File: ldwg.las
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
-Version Information
VERSo
WRAP.
-Well Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 9451.0000:
STOP.FT 10317.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API. API NUMBER:
-Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 35
TOWN.N T12N
RANG. R14E
PDAT. MSL
EPD .F 0
LMF . RKB
FAPD.F 67.48
DMF KB
EKB .F 67.48
EDF .F N/A
EGL .F N/A
CASE.F N/A
OSl . DIRECTIONAL
-Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) and resistivity data (RACEHX, RPCELX) presented is
real time data (intervals 9475' MD to 9952' MD and 10090' to 10290' MD).
Gamma Ray (GRAM) and Resistivity data (RACLM, RPCLM) presented are memory
data (interval 9960' to
10086' MD).
Well S-17B was drilled as a sidetrack on well S-17AL1.
The sidetrack (TOW) began on MWD Run #3 at 9475' MD (8680' SSTVD).
Baker Hughes INTEQ utilized the Orient Express with Ultra Slim Multiple
1.20:
NO:
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
I.f7.ve1 Spacing
Absent Value
BP Exploration (Alaska), Inc.
S-17B
Prudhoe Bay Unit
2204' SNL, 712' EWL
North Slope
Alaska
Baker Hughes INTEQ
NaviGamma, USMPR
13-Aug-01
500292114802
Description
-------------------------------
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
(4)
( 5)
(6)
I(
I~
Propagation Resistivity
(USMPR) services from 9475' MD (8680' SSTVD) to 10317' MD (8814' SSTVD).
(7) The interval from 10288' MD (8815' SSTVD) to 10317' MD (8814' SSTVD) was not
logged due to
sensor to bit offset.
(8) Well S-17B was drilled to TD at
At 10317' MD BHI is replaced by
(9) The data presented is final.The
supplied by BPX (SWS, 31-Aug-1984) was not
possible.
(10) A Magnetic Declination correction of 26.43 degrees has been applied
to the Directional Surveys.
(11) For the purpose of database loading, MWD and RWD data has been merged as MWD
10445' MD (8815' SSTVD).
Anadrill.
depth shifting to PDC (Primary Depth Control)
data.
GRAX
ROPS
TVD
RACLX
RPCLX
RACHX
RPCHX
RPCEHX
Corrected [MWD]
RACEHX
-> Gamma Ray MWD-API [MWD] (MWD-API units)
-> Rate of Penetration, (feet/hour)
-> Subsea True Vertical Depth (SSTVD) , (feet)
-> Resistivity Attenuation, 400 kHz. Compo Borehole Corrected [MWD]
-> Resistivity Phase Difference, 400 kHz. Compo Borehole Corrected [MWD]
-> Resistivity Attenuation, 2 MHz. Compo Borehole Corrected [MWD]
-> Resistivity Phase Difference, 400 kHz. Compo Borehole Corrected [MWD]
-> Resistivity Phase Difference, 2 MHZ. Compo Borehole/Dielectric
-> Resistivity Attenuation, 2 MHz. Compo Borehole/Dielectric Corrected
[MWD]
[MWD]
RACEHX -> Resistivity Attenuation, 2 MHz. Compo Borehole/Dielectric Corrected
SENSOR OFFSETS:
RUN
N/A
GAMMA
N/A
DIRECTIONAL
N/A
SURFACE EQUIPMENT:
Main Surface system software: MSS4 version 4.03, Drillbyte
Memory dump system software: D-Series rev 1.03/PowerComms Rev 1.0
DOWNHOLE EQUIPMENT:
Natural Gamma Ray Sensor: NaI Scintillation counter
MPR Resistivity: 2 MHz and 400 kHz electromagnetic wave
RWD Memory update rates: Gamma Ray 10 seconds
: MPR Resistivity 5 seconds
Note: Each of the resistivity mesurements has an upper limit to its mesurement
specification.
Above these values the traces can show an exagerrated response.
2 MHz Resistivity from Phase Difference 3000 Ohm-m
2 MHz Resistivity from Attenuation 500 Ohm-m
400 kHz Resistivity from Phase Difference 1000 Ohm-m
400 kHz Resistivity from Attenuation 200 Ohm-m
LOG ENVIRONMENTAL CORRECTIONS:
Gamma Ray: Corrected for sensor type and collar size. No correction has been
applied for nominal borehole size, mud weight or
potassium content.
Resistivity: Corrected for tool size, nominal hole size and mud resistivity.
Compensated readings obtained by use of dual transmitter configuration.
CURVE SHIFT DATA
BASELINE, MEASURED,
N/A N/A
DISPLACEMENT
N/A
Tape Subfile: 1
98 records...
Minimum record length:
Maximum record length:
8 bytes
132 bytes
**** FILE HEADER ****
{
(
MWD
.001
1024
*** INFORMATION TABLE: CONS
MN"EM VALU
--------------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
mwd.xtf
150
BP Exploration (Alaska), Inc.
S-17B
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
1. The data presented is the field raw data.
2. The data could not be depth matched to the PDC supplied by BPX
3. The PDC used is a Schlumberger Gamma Ray dated 31-Aug-84.
*** INFORMATION TABLE: CIFO
MN"EM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR GR GRAX 0.0
ROP ROP ROPS 0.0
RACL RACL RACLX 0.0
RACH RACH RACHX 0.0
RPCL RPCL RPCLX 0.0
RPCH RPCH RPCHX 0.0
RPEH RPEH RPCEHX 0.0
RAEL RAEL RACELX 0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 36 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
28
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
Name Tool Code Samples Units Size Length
1 GR MWD 68 1 API 4 4
2 ROP MWD 68 1 F/HR 4 4
3 RACL MWD 68 1 OHMM 4 4
4 RACH MWD 68 1 OHMM 4 4
5 RPCL MWD 68 1 OHMM 4 4
6 RPCH MWD 68 1 OHMM 4 4
7 RPEH MWD 68 1 OHMM 4 4
8 RAEL MWD 68 1 OHMM 4 4
-------
32
Total Data Records:
62
~'
~.
Tape File Start Depth 9451.000000
Tape File End Depth = 10317.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
**** FILE TRAILER ****
Tape Subtile: 2
77 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
02/05/31
188780
01
**** REEL TRAILER ****
MWD
02/05/31
BHI
01
Tape Subtile: 3 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
Tape Subf ile 1 is type: LIS
Tape Subtile 2 is type: LIS
DEPTH GR Rap RACL RACH
RPCL RPCH RPEH RAEL
9451.0000 81.8860 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500 -999.2500 -999.2500
9451.5000 88.7430 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500 -999.2500 -999.2500
9500.0000 263.8830 21.4390 -999.2500 -999.2500
-999.2500 -999.2500 -999.2500 -999.2500
9600.0000 599.3340 45.3830 -999.2500 -999.2500
-999.2500 -999.2500 -999.2500 -999.2500
9700.0000 22.5320 81. 8080 -999.2500 -999.2500
-999.2500 -999.2500 -999.2500 -999.2500
9800.0000 31.3380 78.0690 -999.2500 -999.2500
-999.2500 -999.2500 -999.2500 -999.2500
9900.0000 22.6870 94.1160 -999.2500 -999.2500
-999.2500 -999.2500 -999.2500 -999.2500
10000.0000 24.0980 -999.2500 14.0070 10.5440
12.5890 14.1710 -999.2500 -999.2500
10100.0000 25.1520 -999.2500 -999.2500 -999.2500
-999.2500 -999.2500 6.8400 8.628C
10200.0000
-999.2500
10300.0000
-999.2500
10317.0000
-999.2500
,(
24.3510
7.2460
-999.2500
-999.2500
-999.2500
-999.2500
102.8950
7.5790
4.3530
-999.2500
6.3750
-999.2500
Tape File Start Depth 9451.000000
Tape File End Depth = 10317.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = feet
Tape Subfile 3 is type: LIS
7.5240
7.0470
-999.2500
-999.2500
-999.2500
-999.2500
(
-999.2500
-999.2500
-999.2500
S-17B SurveyHDR.txt
S-17B
50-029-21148-02
9462
10445
Schlumberger - Anadrill
4P1846
BP Exploration (Alaska)
10817
D
Page 1
S-17B Survey PTS.txt
9462.00 39.20 334.20
9499.00 46.80 333.00
9532.00 53.00 330.00
9562.00 57.00 326.00
9598.00 59.20 319.60
9631.00 60.40 315.10
9661.00 63.10 309.20
9693.00 66.50 305.50
9723.00 72.40 303.70
9753.00 77.90 302.00
9783.00 81.50 304.50
9813.00 83.40 308.50
9843.00 84.50 313.50
9873.00 85.80 318.00
9903.00 86.40 318.60
9933.00 86.70 313.50
9978.00 88.70 302.80
10010.00 91.90 306.30
10062.00 94.80 312.30
10093.00 95.20 317.20
10157.00 96.70 312.30
10176.00 97.80 309.50
10204.00 96.60 308.10
10230.00 94.10 306.00
10254.00 91.10 306.70
10312.00 91.70 292.90
10333.00 91.90 289.30
10370.00 90.53 281.11
10445.00 90.53 281.11
Page 1
ANADRILL
SCHLUMBERGER
Survey report 17-Aug-2001 01:56:45 Page 1 of 2
Client...................: BP Exploration (Alaska) Inc.
Field....................: Prudhoe Bay Unit
Well.....................: S-17B Spud date................:
API number...............: 50-029-21148-02 Last survey date.........: 17-Aug-01
Engineer.................: M. Brown Total accepted surveys...: 29
MD of first survey.......: 9462.00 ft
COUNTY:..................: Nabors 3S / Dowell # 4 MD of last survey........: 10445.00 ft
STATE:...................: Alaska
----- Survey calculation methods------------- ----- Geomagnetic data ----------------------
Method for positions.....: Minimum curvature Magnetic model...........: BGGM version 2000
Method for DLS...........: Mason & Taylor Magnetic date............: 00-Y- 0
Magnetic field strength..: -999.25 HCNT
----- Depth reference ----------------------- Magnetic dec (+E/W-).....: -999.25 degrees
Permanent datum..........: Mean Sea Level Magnetic dip.............: -999.25 degrees
Depth reference..........: Gr Tiein 9260
GL above permanent.......: -50000.00 ft ----- MWD survey Reference Criteria ---------
KB above permanent.......: 67.50 ft Reference G..............: 1000.00 mGal
DF above permanent.......: -50000.00 ft Reference H..............: 1000.00 HCNT
Reference Dip............: 0.00 degrees
----- Vertical section origin---------------- Tolerance of G...........: (+/-) 2.50 mGal
Latitude (+N/S-).........: 0.00 ft Tolerance of H...........: (+/-) 6.00 HCNT
Departure (+E/W-)........: 0.00 ft Tolerance of Dip.........: (+/-) 0.45 degrees
----- Platform reference point--------------- ----- Corrections ---------------------------
Latitude (+N/S-).........: -999.25 ft Magnetic dec (+E/W-).....: -57252.81 degrees
Departure (+E/W-)........: -999.25 ft Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: -57252.81 degrees
Azimuth from rotary table to target: 279.40 degrees (Total az corr = magnetic dec - grid conv)
Sag applied (Y/N)........: No degree: 0.00
[(c)2001 Anadrill IDEAL ID6_1C_10]
ANADRILL SCHLUMBERGER Survey Report 17-Aug-2001 01:56:45 Page 2 of 2
=== ======== ====== ======= ====== ======== ======== ================ =============== ===== ===== ======
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual
- (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
=== ======== ====== ======= ====== ======== ======== ================ =============== ===== ===== ======
1 9462.00 39.20 334.20 0.00 8670.25 2463.64 -158.75 -2523.45 2528.44 266.40 0.00 TIP -
2 9499.00 46.80 333.00 37.00 8697.29 2478.40 -136.17 -2534.68 2538.33 266.92 20.66 MWD -
3 9532.00 53.00 330.00 33.00 8718.54 2493.92 -114.02 -2546.74 2549.29 267.44 20.03 MWD -
4 9562.00 57.00 326.00 30.00 8735.75 2510.18 -93.20 -2559.77 2561.47 267.91 17.23 MWD -
5 9598.00 59.20 319.60 36.00 8754.79 2532.38 -68.89 -2578.25 2579.17 268.47 16.28 MWD -
6 9631.00 60.40 315.10 33.00 8771.39 2554.87 -47.93 -2597.57 2598.02 268.94 12.33 MWD -
7 9661.00 63.10 309.20 30.00 8785.60 2577.09 -30.22 -2617.16 2617.34 269.34 19.52 MWD -
8 9693.00 66.50 305.50 32.00 8799.23 2602.66 -12.67 -2640.18 2640.21 269.73 14.91 MWD -
9 9723.00 72.40 303.70 30.00 8809.75 2628.07 3.27 -2663.30 2663.30 270.07 20.45 MWD -
10 9753.00 77.90 302.00 30.00 8817.44 2654.66 18.99 -2687.65 2687.72 270.40 19.13 MWD -
11 9783.00 81.50 304.50 30.00 8822.80 2681.65 35.17 -2712.33 2712.55 270.74 14.53 MWD -
12 9813.00 83.40 308.50 30.00 8826.75 2708.12 52.86 -2736.22 2736.74 271.11 14.66 MWD -
13 9843.00 84.50 313.50 30.00 8829.91 2733.52 72.42 -2758.73 2759.68 271.50 16.97 MWD -
14 9873.00 85.80 318.00 30.00 8832.45 2757.58 93.83 -2779.58 2781.17 271.93 15.56 MWD -
15 9903.00 86.40 318.60 30.00 8834.49 2780.88 116.18 -2799.49 2801.90 272.38 2.83 MWD -
16 9933.00 86.70 313.50 30.00 8836.29 2804.89 137.73 -2820.27 2823.63 272.80 17.00 MWD -
17 9978.00 88.70 302.80 45.00 8838.11 2844.26 165.46 -2855.58 2860.37 273.32 24.17 MWD -
18 10010.00 91.90 306.30 32.00 8837.94 2873.22 183.60 -2881.93 2887.77 273.65 14.82 MWD -
19 10062.00 94.80 312.30 52.00 8834.90 2918.19 216.46 -2922.08 2930.08 274.24 12.80 MWD -
20 10093.00 95.20 317.20 31.00 8832.19 2943.37 238.19 -2944.00 2953.62 274.63 15.80 MWD -
21 10157.00 96.70 312.30 64.00 8825.56 2995.27 283.00 -2989.19 3002.56 275.41 7.97 MWD -
22 10176.00 97.80 309.50 19.00 8823.16 3011.34 295.33 -3003.44 3017.92 275.62 15.72 MWD -
23 10204.00 96.60 308.10 28.00 8819.65 3035.54 312.74 -3025.08 3041.21 275.90 6.56 MWD -
24 10230.00 94.10 306.00 26.00 8817.22 3058.47 328.33 -3045.74 3063.39 276.15 12.53 MWD -
25 10254.00 91.10 306.70 24.00 8816.14 3079.84 342.54 -3065.05 3084.13 276.38 12.84 MWD -
26 10312.00 91.70 292.90 58.00 8814.71 3134.05 371.29 -3115.24 3137.29 276.80 23.81 MWD -
27 10333.00 91.90 289.30 21.00 8814.05 3154.60 378.85 -3134.82 3157.63 276.89 17.16 MWD -
28 10370.00 90.53 281.11 37.00 8813.27 3191.37 388.54 -3170.49 3194.21 276.99 22.44 SP -
29 10445.00 90.53 281.11 75.00 8812.57 3266.34 402.99 -3244.08 3269.01 277.08 Proj MWD -
[(c)2001 Anadrill IDEAL ID6_1C_10]