Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout179-072Cook
July 23, 2014
Inlet Energy_
Mr. Eugene Cataldi
Alaska Department of Environmental Conservation
550 Cordova Street
Anchorage, Alaska 99501
Re: Request for Gas -Only Certification for Kahiltna Prospect
Dear Mr. Cataldi:
\`I C� - 0 7 2
RECEIVED
JUL 2 5 2014
AOGCC
Cook Inlet Energy currently plans on drilling a gas exploration well west of Trapper Creek;
approximately 1.3 miles north of the old Kahiltna River No. 1 well. The latitude and longitude
of the Kahiltna No. 2 well is proposed to be 62° 3' 32" North, 150° 46' 54" West. The Kahiltna
No. 2 well will be drilled to a maximum depth of 7,500' true vertical depth and will penetrate
into the Chickaloon Formation.
This structure was previously drilled to a depth of 7,265' without encountering any evidence of
oil shows or liquid hydrocarbons. CIE believes it improbable that a liquid hydrocarbon system
exists in the Susitna Basin, and is particularly confident in the absence of liquid hydrocarbons in
the Kahiltna structure, since it has been previously drilled. Please see the attached geological
review of wells that have been drilled into this basin.
Cook Inlet Energy believes that there is no appreciable risk of encountering liquids as part of this
drilling, and hereby requests that AEDC make the determination that the Kahiltna prospect is
exempt under AS 46.04.030(c) from the requirement to submit an oil discharge prevention and
contingency plan and proof of financial responsibility, since the well will not penetrate a
formation capable of flowing oil to the ground surface.
Please contact phe At (907) 433-3805 or jr.wilcox(&cookinlet.net if there is any further
JR Wilcox NED
President
Cc: Cathy Forester, AOGCC
601 W 51 Ave., Suite 310, Anchorage, AK 99501
The following is a list of wells examined for liquid hydrocarbons in the Susitna Valley surrounding Cook
Inlet Energy's Kahiltna Prospect location;
WELL
TD
LOGS
DISPOSITION
Big Lake 1
6026'
Gr, DT, ILD, SP
Gas shows
Baranof 4
3750'
No Logs
Gas shows
Fish Creek 1
2035'
ILD, SP
Dry Hole
Lowell 2
3750'
No Logs
Gas shows
Kahiltna River 1
7265'
Gr, DT, ILD, SP
Dry Hole
Kaswitna Lake 1
1770'
No logs
Dry Hole
PU 14 CC
4050'
No logs
Dry Hole
Red Shirt Lake 1
2074'
ILD, SP
Dry Hole
Sheep Creek 1
1371'
No Logs
Dry Hole
Trail Ridge U-1
13,707'
Gr, DT, ILD, SP
Dry Hole
The section drilled in each well was predominantly Tyonek with some shallower formations, probably
equivalent to the Beluga and/or Sterling Formations. The deepest well drilled encountered
predominantly Tyonek Formation with some pre-Tyonek (probably Chickaloon Fm. Equivalent). The
Tyonek section is a series of meandering and anastomozing stream channels with sandstones,
interbedded siltstones and claystones with interbedded coals. The coals are thin and any gas seen is
biogenic gas generated from the coals and is not associated with any liquid hydrocarbons. The Tyonek,
Beluga and Sterling are all gas prone formations. Liquid hydrocarbons are only encountered in the
lowermost Tyonek (G -Zone) section a considerable distance to the south in Cook Inlet.
The disposition of each well surrounding the proposed Kahiltna 2 location is listed above. In each case it
was determined from mudlog and wireline logs that no liquid hydrocarbon was encountered. The
deepest well, Trail Ridge U-1 well, was drilled to a depth of 13,707' to the south-west of the Kahiltna 2
location and was a dry hole. It did not encounter any oil shows or liquid hydrocarbons or encounter any
appreciable gas shows on the mudlog while drilling. Each of the other wells that have wireline and/or
mud logs encountered only minor gas shows while drilling.
The Kahiltna River 1 well, 1.3 miles to the south of the Kahiltna 2 location, drilled a section of gravels
from the surface to a depth of approximately 500'. It then drilled approximately 2400' of sand, with only
background gas, before encountering 3 thick coals at 2900', 3000' and 3200'. These coals did not
encounter any gas while drilling and should act as a seal for potential gas below. Gas readings remained
very low with no shows until coals encountered at 4430' were drilled. The coals in the remainder of the
well down to 7265' only displayed a coal gas signature with no oil shows, fluorescence or cut. The
Kahiltna 1 well drilled a section believed to be Chickaloon Fm. at the TD of the well.
( STATE OF ALASKA (""..
ALASKA ùlL AND GAS CONSERVATION Curv1MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well
ClaSSificatIOn of Service Well
OIL 0 GAS 0 SUSPENDED C ABANDON~D [X
2 Name °tJ~ìe6~orOIL COMPANY OF CALIFORNIA
SERVICED
7 Permit Number
79-72
3 Address
PO BOX 6247
8 API Number
50- 283-20065
ANCHORAGE AK 99502
4 Locatloîa6~eJl ass1fa:!82 , W of NE Cor, See 9, T20N, R~,
At Top ~ö~ëlng Interval I C;
9 Unit or Lease Name
TRAIL RIDGE UNIT
10 Well Number
TRAIL RIDGE III
At Total Depth
11 FIeld and Pool
5 Elevat'~I~ f.eg,(I~§ee KB, DF, etc )
6 Lease D~sl~natlOn and Serial No
f\DL-56870
WILDCAT
12 Date Spudded
13 Date T D Reached
14 Date Com..e ,Susp or Aband
8-24-8¿
15 Water Depth, If offshore 16 No of Completions
feet MS L
20 Depth where SSSV set 21 Thickness of Permafrost
feet MD
17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey
YES 0 NO 0
22 Type Electric or Other Logs Run
23
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM HOLE SIZE CEMENTING RECORD
AMOUNT PULLED
CASING SIZE WT PER FT GRADE
24 Perforations open to Production (M D+ TV D of Top and Bottom and
Interval, size and number)
25
SIZE
TUBING RECORD
DEPTH SET (MD) PACKER SET (MD)
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27
Date First Production
PRODUCTION TEST
Method of Operation (Flowing, gas 11ft, etc )
Date of Test
PRODUCTION FOR
TEST PERIOD.
CALCULATED .
24-HOUR RATE
GAS-MCF
01 L-BBL
Hours Tested
GAS-MCF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
Flow Tubing
Press.
Casing Pressure
OIL-BBL
WA TER-BBL
OIL GRAVITY-API (corr)
28
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water Submit core chips
REf
1(" .ll/lf/)
A/:¡, 'I; "I L / /' "
$I{q OIl , I j 9f1i
~ (¡!is (; \
AIJ",J.. úíl<'
""'Ota u, '°/tl
rue 'Illls.{\. .
fiJlO/J
Form 10-407
Rev 7-1-80
CONTINUED ON REVERSE SIDE
Submit In duplicate
O{k-
"'1
C13
/'ø
t
H
~
~";'"
~,- " ,- "I;"'~ ,-
--
-- --
- . ----- --- - -~----
- --
(-
¡
(-, -
29
30
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MEAS. DEPTH
TRUE VERT DEPTH
Include Interval tested, pressure data. all fluids recovered and graVIty,
GOR. and time of each phase
31 LIST OF ATTACHMENTS
32
I hereby certify that the foregoing IS true and correct to the best of my knowledge
S'gned ~~~~
Title DIST DRIG SUPT
Date
9-03-82
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal. water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in Item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21 I ndicate whether from ground level (G L) or other elevation (OF, KB, etc.).
Item 23. Attached supplemental records for this well should show the details of any multiple stage cement-
Ing and the location of the cementing tool.
Item 27: Method of Operation. Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
, .>rr::~ \.'" ~,"~"~'
. ~li"J '
~
0
"":\'-.'1", ~"'" ~~j ,"""'. ì"
,.'" . '". ,,~/',
, " o;,'? '.<'" ~ - '.,
. ,
,
, . ( ,~. ;. . ~
",'" "I"
~
-,
o~
. '-N~:, : EMORANDUM 'Sta1e of Alaska'
TO- DA TEo - n....
0 c. ~. n 0 September 8, 1982 - a:t),
Chao (J'
. j'fJ / FILE NO: 10 BAlD
IfBRU: Lonnie~. Smith ~ TELEPHONE NO:
Commts810ner -
,
FROM: Bå.rold R. Hawkins
Petxoleum Inspector //://;(
SUBJECT' . 1.. ,,- d t
F1Da AUClD onmen
Inspection
Union Oil Company
Trail Ridge Unit No. 1
Sec. 9, T20N, RIOW, 8M
Permit No. 79-72
~
Tuesday, August 24,1982 - I left Anchorage at 1:30 p.m. by
Troy Air Service accompanied by Larry Cutting, Union Oil's
representative, to reinspect Trail Ridge Well No.1 for a
final abandonnent. I inspected the location throughout and
found the location was clean of debris, lumber, barrels,
and a work shed. I took several pictures to verify the
clean condition of this location and the well marker with
all the well data. Pictures f1, 2, 3 and 4 show the well
marker and the bead welded data of the well. Pictures 5
through 12 show the well graded condition and clean location
of Trail Ridge Unit No.1.
In summary, this inspection was a follow-up inspection that
was performed August 12, 1982 and \8J8S not approved for
abandonment. However, Union Oil has cleaned up this location
since then and I recœuœnd that the location be approved
for final abando~~nt.
./
~
-..--
'.
02-001A(Rev.lO/79)
, .
~iJ\U:. I .\,^~I\^
~LASKA OIl.. AND GAS CO~SERVAT ION COH~USSION
!\) SURFACE ABANDONHEN'f REPORT ~\
\¿, 20 AAC 25, ARTICLE 2 ~-
.,...,~
...
..
FILE INFORMATION:
Operator !/,uI"P ð /1. J:t!¡lfI'AÞy'
Address 'ptJ /ð () ~ 6 ). r ( 4þlïl AI( <; ?-rð Â
Surface tocation of Well
, /t)(,9.5({Ft. F...:LL, ;3J.9(tJ) ft. FIV L,ðfP;r,,~~þl(
Sec. 51 ,T.M...lL' RM-tP,-.~M. Unit or
Date Downhole P & A AU C ()j / ;1. 'I; /..J' 11""2...
Pennit No. 7 ~ - 7 ~
API No. 50- 7 1"3 - ~ ðð ~~-
Lease Name TItAn. 1I}01>[: uP}T
Well No. .:L
Field & Pool WI J. /) fA r
20 AAC 25.120: WELL ABANDONMENT MARKER:
Dia. Steel Pos t (4"Min.) I'J J( , Length (10' Min.)
Height Above. Final Grade Level (4' ~1in.) "7 '
Top of Marker Pipe Closed with: Cement Plug
Set: On Well Head, On Cutoff Casing ~,
Distance Below Final Grade Level"
Side Outlets: All Valves and Nipples Removed
All Openings Closed, With Blinds
Screw Cap
In Concrete Plug
Ft. (;7 in.
Welds
v
, With Cement
, Other
INFORMATION BEADWELDED DIRECTf.LY TO MARKER POST:
(List Where Different from File Information)
Operator 1l)J/tJV Unit or Lease Name 1""1f/t/1.. IŸ/bcf
Well Number --1 , Surface Location of \.]ell:
Ft. F L, vi Ft., F L, Sec -, T -' R
/ ð 6f( ',5"1 s - 3tr J IS~¡: J:"OífÞER
20 AAC 25.170: LOCATION CLEAN-UP
PITS:
Filled In
-
I) V II
-- - M
-'-
~, Liners Removed or Buried ~ , Debris Removed
V'
SURFACE OF PAD AND/OR LOCATION: ~
------ Rough , . Smoo th , Con tou red ý , Fla t
Other
, Compacted
,
CLEAN UP OF~AD AND/OR LOCATION:
Clean~, Pipe Scrap, Iron Scrap
Paper, Other
, Wood
, Mud
, Cement
,
SURROUNDING ~REA: .
Wooded ~, Brush
Sand, OtMr
, Tundra
, Grass
, Dirt
, Gravel
CONDITION SURROUNDING AREA:
Clean ~, Trash from Site
Other
, Trees and/or Brush from Clearing Site
,
ACCESS ROA:D:
Dirt, Gravel
v/, Ice
, Other
CONDITION_A~SS ROAD AND SURROUND1NG/
Clean 1.., Rough, Smooth V, Trash from Operations
Trees and/or Brush from Clearing Road, Spoil from Clearing Road
Other
REMAINING TO BE DONE: /1/0/ ~/..
RECOMMEND- APPROv.AL OF ABANDONHENT: Yes /', No
INSPECrED BY 2£"" . . /.' ç' ~/ ""?<"~ ,-
OS/26/81 /.. ARt: y~ T/LIG rJtJílFlj 01). lYE?
()¡1/f £t)fY TtJ VPltJ)/ tJl/.. ,
Final Inspection .I'rPPfiO fiE/]
DATE
75' -,2 f-Ir ^
v II 111,A1 0 It r O,A1 P A A/ v
TR A IL 11//)0 £" VJf!lr ¡A/,.;t
S EC PI .r.zo #.J Ii /d w/S/þ'
4-8A¡t/þ() ¡V M¡:~r A Pflfo¡/E /)
.1.
~
I
¡
~
~
"
':
t}
1
t
)jP
V.LIr/O
1,it4 7 7 V
r ---.""
/
""J)"/J,l ,ny
~I
J/tl ~ ~d
~I :;'1)/ tJ V W
..., ~ ] I'1l
II
91
q .
,
'tll ¿If}, r ~ 4 If
5
~.A' ,íj,'f ,¡tV
J
~
L
- --- --------
..
,1
~ " ", "",~, ',~ ,.~ .,...~,~, '" "R-Z"," ~..~~, ,-' "'~'" ,,'"_:""','~'~:"_'~""'p..,.tI.!J],,Y'~""""'i-';f.,~""""'f~' ,..,¡ ';""1'Ì.~"-'" "
' . ". :.,.~ "'¡J '~'r¡.'1,""\"'. ".,..:'".' ~~~"~~':!Ii,""<"\"..~1""":;' 1{~'.~,"""" I ",t
. ~.'t" '.., .>\or.~ ".' -<t-<" . (",~,,"..' .. ,."";'>,'7" . ~ ~\"... ...'_.r ".:.j;
. ~ .. .' \, '~" , . ".
',' ."~..¡, t. ~;,'
, .. , '.'
,... . I . :I.",
)~ , / .. ,~¡
,,'~
.
-, '
Sept:-ber 27, 1982
Onion Oil CaepaDy of CaUforaia
P.o. Box 6247
Anchorage, Alaska 99502
Pinal Aban40nman~ Location C1eaD-up Inspection
n:a1l Ridge Unit Mo. 1, Sec. 9, -r20N, RlOW, 8M
Gentle_D'
!fe!
OUr representative inspected this ai'te on August 24, 1982. It
_8 foune! that the clean-up was acceptable and tha t there was a
proper -11 -rker.
Consequently, final abandonment of t'rail Ridge Unit No.1 is
approved.
Sincerely,
7' (~~., ~1-J
--- -~.{ . v'
A~ ,. - . t. ... -'" ...
Lonnie C. I Sid th
Commissioner
LCS/JKT/glh
- --
1 Status of Well
- . ~
I"' STATE OF ALASKA (
ALASKA t}H, AND GAS CONSERVATION CO dSSION
WELL COMPLETION OR RECOMPLETION REPORT AND LO ~
ClaSSification of Service Well L
1
~
~
rl
SERVICE 0
OIL 0 GAS 0 SUSPENDED 0 ABANDONED Œ
2 Name °Ù~e6~orOIL COMPANY OF CALIFORNIA
7 Permit Number
79-72
3 Address
PO BOX 6247
ANCHORAGE AK 99502
8 API Number
50- 283-20065
4 Locatlofd6~E¥lass~fa~82' W of NE Cor, See 9, T20N, RIIW,
At Top ~å~ëlng Interval
9 Unit or Lease Name
TRAIL RIDGE UNIT
10 Well Number
TRAIL RIDGE III
At Total Depth
11 Field and Pool
5 Elevatl~.r~~e6t,(I~Šr.te KB, DF, etc )
6 Lease D~slsnatlon and Serial No
I-\DL-56870
WILDCAT
12 Date Spudded 13 Date T D Reached 14 Date Come. ' Susp or Aband 15 Water Depth, If offshore 16 No of Completions
8-24-8£ feet MS L
17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of Permafrost
YES 0 NO 0 feet MD
22 Type Electric or Other Logs Run
CASING SIZE WT PER FT GRADE
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM HOLE SIZE CEMENTING RECORD
AMOUNT PULLED
23
24 Perforations open to Production (MD+TVD of Top and Bottom and
Interval, size and number)
25
SIZE
TUBING RECORD
DEPTH SET (MD) PACKER SET (MD)
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27
Date Fclrst Production
PRODUCTION TEST
Method of Operation (Flowing, gas 11ft, etc )
Date of Test
Hours Tested
PRODUCTION FOR 01 L-BBL
TEST PERIOD. .
CALCULATED OIL-BBL
24-HOUR RATE.
GAS-MCF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
Flow Tubing
Press
Casing Pressure
GAS-MCF
WATER-BBL
OIL GRAVITY-API (corr)
28
CORE DATA
Brief descriptIOn of lithology, poroSity, fractures, apparent dips and presence of oil, gas or water Submit core chips
RECEIVED
SEP 1 \) 1982
i\1~c-.ka Oil & Gas Cons. Commission
,t\....... Anchorage
Form 10-407
Rev 7-1-80
Submit In duplicate
CONTINUED ON REVERSE SIDE
/'
~-
I -,
, N,y.-,
'. -
'>-'-
29
30
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MEAS DEPTH
TRUE VERT DEPTH
Include Interval tested, pressure data, all fluids recovered and gravity,
GOR. and time of each phase
31 LIST OF ATTACHMENTS
32
I hereby certify that the foregoing IS true and correct to the best of my knowledge
S'gned ~:_-
~, c.OO..J.oÀ..~.ß
INSTRUCTIONS
Title DIST DRLG SUPT
Date
9-03-82
General This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases In Alaska.
Item 1 Classification of Service Wells' Gas injection, water injection, steam Injection, air injection, salt
water disposal, water supply for Injection, observation, injection for in-situ combustion
Item 5 I ndlcate which elevation IS used as reference (where not otherwise shown) for depth measurements
given In other spaces on this form and in any attachments.
Item 16 and 24. If this well IS completed for separate production from more than one interval (multiple
completion), so state In Item 16, and in Item 24 show the producing Intervals for only the interval reported
In Item 27 Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such Interval.
Item 21 Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
Item 23 Attached supplemental records for this well should show the details of any multiple stage cement-
Ing and the location of the cementing tool.
Item 27 Method of Operation Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas I njectlon, Shut-In, Other-explain
Item 28 If no cores taken, indicate "none"
Form 10-407
..... ....-u _.~--....
.-
1
DRILLING WELL 0
COMPLETED WE LL ~
oßJ~~
/f
OTHER 1
L--
It
Þt
d],
"
~ - (~-, STATE OF ALASKA (-"
ALASKA 'uiL AND GAS CONSERV ArlON CL,~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
2 Name of Operator
UNION OIL COMPANY OF CALIFORNIA
3. Address
7. Permit No.
79-72
8. API Number
PO BOX 6247
4 location of Well
ANQ-tORAGE AK 99502
50-
283-20065
9. UnIt or lease Name
1069' S & 382' W of NE Cor, Sec 9, T20N, ~'J
S.M. n W
,~'O ~
TRAIL RIDGE UNIT
10. Well Number
TRAIL RIDGE III
11 Field and Pool
5. Elevation in feet (indicate KB, DF, etc.)
6 lease DesIgnation and Senal No
12.
216.6' M~I ADI-56870 WTI n~AT
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF:
(Submit In Triplicate)
Perforate 0 Alter Casing 0 ' Perforations
StImulate 0 Abandon 0 Stimulation
Repair Well 0 Change Plans 0 Repairs Made
Pull Tubing 0 Other 0 Pulling Tubing
(Note Report multIple completions on Form 10-407 wIth a submItted Form 10-407 for each completion)
13 Descrrbe Proposed or Completed OperatIons (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170) .
(SubmIt In Duplicate)
0 Alterrng Casing
0 Abandonment
0 Other
0
0
0
~
I' ..
The well co-ad should be changed from 1069.58 Sand 329.03 W to 1068.51' Sand
381.51' W as shown on the attached surveyor's plats.
7)0 t..rc::.. A/1-10Ç "J /,vtP5é-7 c.),J
,;28 P /L '7 é-O ~¿ ~ 4"J
3 g I, .;- I 1"1/ N~ C<:>~
I
(~ ¡:;
/éJ-2-lf/
J
/D 6K, S-/ 5 ~
J.k.T- ..//J.~-<¡ ~ 77/~ 7'- 2- i L
4//~ þtr~-I /I~ ~o;tJ¿".JS ~ ErE lYE D
/ AI 5' ~6f:7~() tf2e;t:.@J7l 7 ..I-h ~ ...v 0 7/ ~.o -;;/;; ,é)1 ~ý CT
tUet~ /kI9-4KŒ7L ~ 0(/ /2 ¿J-~L ~ñ-) m18i/~
0,4.-74, ¿?,øJ ~-vc ~~ Æj-, ~& ò ~c.& *~y
ÄUIfO /#"'77 -'9 /26s(.læ~~~ ~kffÞ¡~er~~~ .H.J
~ "Z- 9/ /'7rO-, 4/ÆJ7ú../ J-I~ ~~,e¿~.T~g~);J -;-~
~ A4ARKe"Áè4
14 I h reby cer .fy t~a~T../ng IS true and correct to the best of my knowledge
S'9n ír- ¿j~ ~ Tot'e DIST DRLG SUPT
e spa below for Commission use
\/U ! /~<~)- P/
Date 08/30/82
Approved by
Form 10-403
Rev 7-1-80
By Order of
COMMISSIONER the Commission
Date ------ ------- --
Submit "Intentions" In Triplicate
and "Subsequent Reports" In Duplicate
..
('
(
...
.
,..
,..
~/ ,.
. ,
31
.
'32
36
ow
<'1
"=ö
I hereby certify that I am properly
registered and licensed to practice
land surveying in the state of Alaska
and that this plat represents a
location survey made by me or under
by supervision, and that all dimensions
and other details are correct.
May 29, 1980
NOTE: This survey location
... "þ'as~çl on USGS /:::::. Beluga.
RECtlVtU
SEP 0 11S82
DATE
A!aska Oil & Gar; Cons. CommISSion
SC AL E: t\iìch1M41IJ1:
AS BUILT
TRAIL RIDGE WELL NO. I
LOCATED IN
NE 1/4 PROTRACTED, SEC 9, T20 N.RIOW. SEWARD MERIDIAN, ALASKA
Surveyed to'
UNION OIL COMPANY
OF CALIFORNIA
Sw-veye" bV
Bell, Herring and Associates
ENGINEERS AND LAND SURVEYORS
801 West Fireweed. Suite 102
ANCHORAGE. ALASKA 99503
.
(
(
...
5
4
I
3
.
-
TRAIL RIJGE WELL #1
en
l1)
.,g
Q
I 0-.~~ðI.S11
I La t . - 61 ° 50 ' 33 . 602 "
Long. = 151°05'00.963"
Y = 2,867,067.12
X = 312,775.82
ASP Zone 4
Well Elevation: 222.'+
I~
ß--
----
--10
V'
CQ~
I
I
/
17
I
I
I
Ib
15
I hereby certify that I am properly R feE' V: n .
registered and licensed to practice Nð~E: Th1S survey location
land surveying in,_the state of AlaskaSEP 0 J 1982 based on USGS 6 Beluga.
and that this plat represents a ~ .
location survey made by me or unþOll&GasCon" co'.'"
A nIl1l1lSt'I"
by supervision, and that all dimensions nchorage . '~'t\J(¡ ,
and other details are correct. SCALE I = 1000
May 29, 1980
DATE
~""""'"
~.,¡.;; OF Ai~\,
~~~e......;:tS '.
~.. .. ~,.
,., "t.. . '.
. .. f',
.:9:
AS BUILT
TRAIL RIDGE WELL NO. I
LOCATED IN
NE 1/4 PROTRACTED, SEC.9,T20N, RIOW, SEWARD MERIDIAN, ALASKA
Surveyed for
. UNION OIL COMPANY
OF CALIFORNIA
Survey." bV
Bell, Herring and Associates
ENGINEERS AND LAND SURVEYORS
801 West Fireweed. Suite 102
ANCHORAGE, ALASKA 99503
"
(
MEMORANDUM
(~
State of Alaska
0 ,. AND GAS CONSERVATION COMMISSION
Thru:
Lonnie C. Smith /6J6
Commissioner j
DATE. August 17, 1982
FILE NO. 108A/B
TELEPHONE NO
FROM
Harold R. Hawkins J. f?/'
Petroleum Inspector¿7IÁ'/7
SUBJECT: Conduct Final Abandonment
Inspection
Union Oil Company
Trail Ridge Unit No.1
Sec. 9, T20N, R10W, S.M.
Permit No. 79.72
Monday, Auqus~ 2,1982 - I left Anchorage at 1:30 p.m. by
, . .
Troy Air Service accompanied by Larty Cutting, Un1.0n 01.1
representative, to Trail Ridge Well No.1.
Thi s inspection is a follow-up aœndonRent inspection that
Doug Amos and Ed Sipple observed October 2, 1981 and did
not approve.
The location is graded and contoured, the mud that was a
concern in Doug Amos's report, is dried up and not one of
the problems at the present time. However, Union Oil made
no effort in cleaning up the location of debris, lUJlber and
trash, that was mentioned in Doug Amos's report last October 2,
1981. Not mentioned in the inspection report of October 2,
1981, were two water wells, one at the drilling pad at the
northeast end and one at the camp s~te at the northwest
end. Both of the water wells were cemented and top was
covered with steel cap welded. Picture t 1 shows the well
marker, all data is bead welded on marker. Picture 12
shows the capped we. ter well and level con.di tioD of pad and
pit area. Picture 13 shows the mud dried up that was a
concern on the previous inspection a.n(f~ the camp water well,
that is cemented and cap welded on-/top. Pictures 14 and 5
show shed and trash around location. Picture 16 shows
barrels, lumber and debris scattered around access to
location. Picture 17 shows other metal and debris close to
shack.
I took pictures of the location to be attached to this
reIX>rt, I also filled out an A.O.G.C.C. Field Report which
is attached.
In summary, I inspected Trail Ridge Unit No.1 for a permanent
abandonœnt for Union Oil. According to Lar ry Cutting, the
Union Oil representative, clean-up has not been performed
since the last inspection on October 2, 1981. I do not
recommend approval of abandonment of Trail Ridge No.1
until general clean-up has been performed.
...-
02-001A( Rev.IO/79)
1~,
. , ",
"'-
¡;.
'"", \""',., -;
,
~i
,-~. &1110, - r - 'U- \--.,---- """l'tnr-,- . 1I.r--~-!'~":"""~~T;'-;"~»>~~~""":""""--"~
~ AU,SKA"OIr: A~) {;AS ( ,.':tlf1t:"^1tt~;¡. l~i.\;':':-,~.,)~;
9. SURFACE ABANiJO:H-ŒNT REPORT t"'"\
. 20 AAC 25 ARTICLE 2 ~.J
, ' h,'
~
~
FILE INFO~~TION:
Operator V ,(/111/ ð IJ... Date Downhole P & A '6- >I - íJ 2...
Address Pt). 812)«(,1.'/7 A~CII.ÀK ?Pfl12 -
Surface Location of \~el1 ~ Penn it N(I. '7 j7 -'? ~
/ð ~f,Jf/rrt. F Sol, ?Æ5',OI Ft. FkI L, or rl/FpE ~~-'API :10. 50- 7ft' .J-~ð ð 63
Sec. 11 ,T ~o JL..' RiL l&L, _5-.}1. Unit or Lease Name rRIt-IJ. fi)ÞCe I~Ø/ ¡-
\~e11 ~o. AI ð I
Field & Pool f¡/ /J.. 0 fAr
/
20 AAC 25.120: WELL ABANDONMCNT ~~KKER:
Dia. Steel Post (4"Hin.) 0/-( ,Length (lOr Hin.)
Height Above Final Grade Level (4' Hin.) 7;/
Top of Narker Pipe Clo~d with: Cement Plug Screw Cap
Set: On Well Head / ,On Cutoff Casing ~, In Concrete Plug
,
Distance ßelow Final Grade Level' ð Ft. (J in.
Side Outlets: All Valves and Nipples Removed o/Æ
All Openings Closed vjA, \~ith Blinds ~A ,'- \~ith Cement ~ ' Other r-
\,-.'elds
~
INFORHAT ION BEAJ)\..'ELDED D IRECTf.L Y TO MARKER POST:
(List Where Different from File Infonnation)
Operator tI,(//ðl/' tJ)/~ Unit or Lease Name T/i/ljJ. j(J.jJLif UJI/d Ifl
Well Number .# I , Surface Location of Hell:
Ft. F L, Ft., F L, Sec ? ,T20.l:!-, R/¿J tV, Æ-H
Ie) Ii., I 5'"1'$ 1 ~/,.J" W pi! £b/tþ¡:'/?
20 AAC 25.170: LOCATION CLEAN-UP
PITS: . ~
Filled In V, Liners Removed or Buried V, Debrls Removed V
. -
SURFACE OF PAD N~D/OR LOCATIO~: ~
~ough , Smooth, Contoured~, Flat
Other
, Compacted
CLEM~ UP OF PAD AND/OR LOC^r~~: ~ ~
Clean /" Pipe Sc rap r, Iron Sc rdp y", Wood V , 1'1ud , Cemen t
Paper v, Other jJ~.4.57/r I Avn ðJ.ð ùJ~1f /( $/lÆ-D AIVf) T/fM#
S~ROUNDIN~A:
\.Jooded , Brush, Tundra, Grass, Dirt, Gravel
Sand, Other
COt\DITION SURRnUi':DING AREA:
, Clean V, Trash from Si te
Other
, Trees and/or Brush from Clearinlj Site
ACCESS ROAD:
Dirt, Gravel
/rce
, Other j..,/('.- ,,' r
,
" CONDiTION ACCESS ROAD AND SURROUt\DING: /,
Clean, Rough, Smoo th , Trash from Ope fd t ions ~
Trees and/or Brush from Clearing Rodd , Spoil from Clcdrlng Road ~
Other Þtt'D/L. 11/15 Er;t//?#,,:~T -r. /.pu;l¡¡:/y ¿)v L.tJl..'AT/¿Jp TO 8£-: £.L.E.¡t~t:-ø v8
,.~, , CJ¡..J PIY/hL 5JTL= A[r£~J Ift'JA/) ,¡Av/~ .A//?flt!Æ'TiTlJ,vÞ,.J,AY,
REMAINING TO BE DONE: kl-='þ'::I1"'AÁ rL.£fiv V¡J /)t=' AlJfAT/ð..</
No / Flnal Inspcc t Lon
RECOHHEND APPROVAL OF ^ßANDON~1ENT:
Yes
.
INSPE.CTED BY //!11f/?,{Jo '/il lIAtI.//(iÞ'5
OS/26/81 J..¡i~1(1 ÁoT7/PC {/IVJI'V /?r3P,
DATE )( - )? - ?f" ..z
?
, A RA / IJ () .()tt ,t: IV r / '" - ~ I'fr TI '(J
fL/ 1t1/t/ " II. C (J I'fP,4I1Y
I/fAII If 'Dr; F p (J.1
-~
- -
- --
-----
Ir Ii A 1/ íJð jV M F ¡t./ T }./ ('J T Æ /' ?Æ'?1 V E/2
J ,u, $' :P E [" 7Ef) AP liJ./-J2 ~ ~
J/ A Ii' ð J../) R. II A lAl/tJP'S- -. -. - .
I
,
~
f
~
."~
., , "
---,-, --- -
\.
,
..
" ":,,".,,,,*,
i
I
r
\'
1.1
~
~
:J
~!
~
-'
,'.
"
"
P'
c!
., ,
, i
J
~
"
-'.--
------ - ---', --- -------.---- --------
-/
"
r:.l j ,,-/-'J [/Þ':: j'
l ~ J .
- (I-/ - ~ /~ \/ '--r
..;'-. '; . -:-If
/ / -')" , -... í
V-I };I' (. ...! , <-
, ." -
/
¿-L-
- - --. -
"
---
./-
0 ¡)
, I
, /:-í;>
¡;..
----
~,
~
"
.....
\
)
I
,
I
.,
,"
,'"
I .~.....
I '
/
./
1/7!:Jfi J / d
~ J~;I/l
~ ~-
_r'>\ Y)
/ //
Ll
,.
,"",
...
,,;1", ,
/-:/
:t:.
I~",
f ....
~
/
,
>/;' >;"'/0
' " . J '{~f ( I,
ì,/~; ( r) (í í J / /"1 c' C -L 6 S
f/;.'1ì'l.J (j j J (I [II j' I "B £1 S I ~ç ));, 9 P I
) / '>,
----- -
--
--
~-~
",0
....
---
.
/
...
- J¡f~ J.;# T
()' :7 J...7. ::;cfS/1 }
.--' \
- '\
_~I
.
¡
,
: (/Ifi-l (v\
_/:J"~ ';/1{ 'Î'.JV
Il;,-' -
J
I'
I~.,
\ "
\--.
¡ ..-.......,.
",
"..
~.-
, ,.
-'A
J I
-J.",_'
I,"" ")
(I'" Jf .¿., .'
U"f '- t -, I/.
'" ( ,;;;--..,
':7 -í~, I /rll Q
"..,,-'(1'
\. _1...... J
!>.> I
I ',¡ "1
..{
L.-
""Xl s:fJ-'-- . ---
-,
,
, .
,
,
I
. I
\
, '....
"-
7VEÝ'Ç); l \.
1."fJ 0 ..-:-- .
r' ~I x?; // ---.:
I r-- ;¿ ~ "
7f ~ '----J . "
/' H ). (t:O )J/.L 1\;
j '})"-:" I ,
/ ~- ~ ' ,- ,
:,~ -;.j -' fIP /' "', "~'~I
)):~ '1' - '.. .-/ -' I
" \. ,t.¡ f1 I: L:::; I
[? tJ (/J-J ~ !-J '..' .... -> I
". /-'-' /¡ ~/
' t.-
71-.~...rlI0 ,:.. I'
"-':>. d
, - ' ,
. ,
. ,
....
,
'-
1
,¡: '.w
;.,á-d >'
1-' -/' -I
-'" o'
j Ý//~-' 1 ():/ 3 9
r I)¡'; .;1.¡(jÍ ~ (J
.;> - ~--- v .jz;, oJ
çt 31// ;I:l 'í':; :l g CJ ..L
, ..r 'Ý-
~
f'".--- .
, ----
. ,
Jf
_/
/,
/~"1J ~." ~:r.~,:/ //~w/
~/ .,;/"".:-r // /:
~ -, t: /~ -6-,,8
\ , I
- (I. 7...1. ~~ '1,:/ f /1
,,'
..,
r
/" .
J
dl'"-
//
./
(
,
( STATE OF ALASKA J.
ALASKA olL AND GAS CONSERVATION C"...'I1ISSION
SUNDRY NOTICES AND REPORTS ON WELLS
DRILLING WELL 0
COMPLETED WELL 0
OTH E R IX!
o.~
9
'L
1f
~
2 Name of Operator
UNION OIL COMPANY OF CALIFORNIA
7 Permit No
79-72
3 Address
PO BOX 6247
8. API Number
ANCHORAGE AK 99502
50-
283-20065
4 Location of Well
1070'S & 329'W of NE corner,
Section 9, T20N, RIOW, SM.
9 Unit or Lease Name
TRAIL RIDGE UNIT
10. Well Number
TRAIL RIDGE ill
11 Field and Pool
5 Elevat~f6.fge,t (~~ate KB, DF, etc )
6 Lease Designation and Serial No
ADL 56870
Wildcat
12
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF.
(Submit In Triplicate)
Perforate 0 Alter Casing 0 ' Perforations
Stimulate 0 Abandon 00 Stimulation
Repair Well 0 Change Plans 0 Repairs Made
Pull Tubing 0 Other ~ Pulling Tubing
(Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion)
. . . ,
13 Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
(Submit In Duplicate)
0 Altering Casing
0 Abandonment
0 Other
0
0
0
0
Request a final site inspection of Trail Ridge #1 for abandonment of drill site.
RECEIVED
AUG - 9 1982
Alaska Oil & Gas Cons. Commission
Anchorage
14 I hereby certify that the foregoing IS true and correct to the best of my knowledge
Signed ~~ (2h C(\OO~~~~DÁ...
The space b~W for Commission use
ConditIOns of Approval, If any
DIST DRLG SUPT
~ø-^-lsß Title
. r: proved Copy
Date
ReturneJ
8/3/82
~L9L~ r Z r
Our representative ins¡:ected this location on August 24, 1982 and final aba.ndonœnt \\as
approved. / l7 /.). /J /'
Approved by A/~J I/f fN
Form 10-403
Rev 7-1-80
By Order of
COMMISSIONER the Commission
Date -UL-:? ,J -? k
Submit" I ntentlons" In Triplicate
and "Subsequent Reports" in Duplicate
--
Document Transmitt~"
Union Oil Company of Ca.
la
unlen
NO. ~ Page 2 of ?
DATE SUBMITTED
AC COUNTING MONTH
4-26-32
TO
FROM
~~r. ~!fq. Van J\.len
R ¡-. '1 t'
. L. /.a.r nen
AT
AT
TELEPHONE NO
TRANSMITTING THE FOLLOWING
Trûil Ridge Unit 11:
1
ec1.
Certified ~urvcy ~lJt
KU 34-32:
,
~d.
C~r'Li rieL! ~ur've'y pldL
No Le s t d a La a v d i 1 db 1 e alL his L 1 tIe
KI3U 31-/:
051 test 1 thru 5
PLtASl ~;r! I\[~U KI:.IHH.N l11.~~ CorY
, /..-. ¡? /J - <1 / /'; /l
RI:.C~_IY~:Ðt//~-V?~ G~
UAIt:.:
FORM 1-2MO2 (REV 11-72) PRINTED IN USA
,
~
~"
c, ~
[?J I
,'I"-' :
,~,.
" ~
,- ..¡
.
,
----
----
-
~r~.
..
~'~'
" i
PLAT #2
~
~
~
:i
,
.)
I
-"':
.~--.:
'4
l
"
'.
-~
.. "\>
-"'~--'~""'-"'_11.'
r
~
I:
... ,.
,
,~
.
.
,
,
E
~
...
I
I
Ie
..
1
,
...
...
"
~
'!
\~
~,
.' .
,...:;
'"
:'"
,- :;\
,{
tì~
'.
)1
')2
36 .
.' ~
. t
I
- -. i
. "
~
í
.
..
...
j
",
I
!
~W
22 I
I
,
.
.
,//1
~:
.
.-
2). ~
~
oj
"
~
;
'.
1
. :>I
-""""'",- -.~,.-~~, -~
RECEIVED
APR 2 8 1982
A 1'),..-
....I..,fŒ Oil & G '"' '
~L Guns C
AtJCl-¡or:'~g' . onml'sC'.¡
C' . 9 . oJ 0/7
. ,
, I
, .
.
'. .
. , ,
. , " ,
CERTIFICATE OF SLA EYOR
I L'~r~:jJ œrtify that I am proper!..: registered
;:~.. llc~n.sed to practice lard. surveyin:J in the
w...l,-C of Alaska ard that this plat represents
., 1~1tiC'r1 survey rrade by Ire or under- my super-
Vl:llon, ard that all dimensions and other details
~ r,~ correct.
.
, ' .
NOTE:
This survey location
based on'USGS~ Beluga.
SCALE I" = I mile
'. AS STAKED
TRAIL RIDGE WELL NO. I
LOCATED IN
'--
D,\'~:- .
.. -- .
.
~'-'-,'"\.'-'-'\
-. --~ Of Ai \\ -
~~~..e..... ~ ... \-- '
~.I. r . ¥Ji' . U~~
,.,~., .4 ,.. '(~
, ~.'" .. 'I
~~l49m \.J ".*~
¡,;... .~.... .H..... tt ....~
~ '-.....L'P ,A.'Ý',/ f7ý /.';'/ ." ..~
~.. 8...................... f1I.
'I,,~'.. JQHfl it ~.g :;:: ::
'I ";;. .. . No.. 953. 3 . ~ l::: ~
¡ '/: . . ~ "..,
'¡ ~.... ....~...-
, \ ¡* . . . . . . '\,-
\\i:r/!!r.H l\. \\_-- '
'-'\..,,~,-.
SU1"vey.d Þ¡ .'
B~n, Herring and Asso<:iales
ENGINEERS AND LAND SURVEYORS
801 West Fireweed. Suite 102
ANCHORAGE. ALASKA 99503
9/12/79
SE 1/4 PROTRACTED. SEC,9, T 20 N, RIO W 1 SEWARD MERIDIAN, AK
Surveyed tOf"
- UNION OIL COMPANY &.
OF CALIFORNIA
~-
- - - -u_- --- - ---- -- ---------------
. '---.
",-(';{ :\~~.~. " ,
.'! \'. '!' ,",' ,~ " .
í ."",' "
. ;
~'-' ":~~'
.¡!ì f;r'~\~ 4.
,I
".
ALASKA OIL AND GAS CONSERVATION COMMISSION
i'
..
. t
.<\;."- ~,~~
\ 'I".
"
Thrul
. -"
Chat c..(V If} . n
Chai~ A.
.~~ie C. Smith -/~
Commissioner .(
Doug Amos a~~ -.
Petroleum Inspector
February 11,' 1982
'- ;{" ,¡
Conduct Final Abandonment
Inspection on union~il
Company's Trail Rid e Well
Sec. 9, T20N, R1OW, S.M.
Permit No. 79-72
=-,
FridaYI October 2, 1981 - Mr. Ed Sipple and I traveled this date
from Anchorage to Union Oil Trail Ridge No.1 Well.
The location is graded and contoured, however, as photo's numbered
2-8 show, mud is bleeding out of the mud pit and running down
the length of the pad and staging area. Photo's 9-11 show ~e
mud that is bleeding from the mud pit on the extreme east en of
the pad and running off of the pad and onto the tundra. Phot's
12-14 show the stockpiled lumber and caretakers shack at the
west end of the pad. There is a well marker post cemented into
the well bore with the correct bead welded information on it.
Because of the mud bleeding from the pit area and the stockpiled
materials on location, I recommend to the Com Iniss ion that this
location not be granted final abandonment status and that anot~-
inspection be conducted during the summer of 1982.
In summary, Mr. Ed Sipple and I conducted the inspection for
final abandonment on Union Oil's Trail Ridge No.1 well. Due to
mud bleeding from the pit and stockpiled materials on the location,
I recommend that the Commission not grant final abandonment
status to this location and that another inspection be conducted
the summer of 1982 to determine wha~ action, if any, needs to be
taken on the mud problem. I filled out an A.O.G.C.C. Surface
Abanonment Report. It along with pictures showing the condition
of the location, are attached.
'F,' .' ""P'1I'~,';',.
. ",:. .",
'.',.'. ~ "~
- .
- I<
~
."", '" ~.,~~'
.',
" .
¡
,Þ
..
S\~:,
rILI~ 1 Nt'O RHAT iON:
Opcrator //nJ~ ¿:r/ a,
Add cess
Surface Lo~H ion of \"ell ¡:;'ðn1
1t:J6fJ Ft.'~ L, 3é31 Ft.1£LL,
Sec. q ,T.:Z2 iL, RJÆ. Jd.., S I :;.
~
Date Downhole I' & A
~O ^AC 25.120: "'ELL An:\rm()~::'~I:~T :"~.\!a,EI\:
Dia. Steel Post (4"Nin.) ¿--' I Length (10'
Height Above Final Gr¿ldc Lc\'cl (I. I NiB.) (/'
Top of Narker. Pip~ Closed \vi th: Cement P lub
Set: On "¡ell Head, On Cutoff C.lsing ~
Oista'nce Relow Fin<ll r.r;H.I~ .L~vel
.."
Side Outlets: All V.1lvcs and r,ipp1cs R~:lIoved ~
All Openings Closed /" ~"l th 131 intis
PI:l1l1jtNf\,
APl ~ll). ~)()-
Unit Ol- Le,lSl? ~:.1mc ~:'IJ'I D.1'---./~
/ /7::::Ji ""'- .. ~ c. :~;-~
#/ /
1/..1 ~. h/r1~ f.
101
7--1 - 77-
\.,'e 11 ~:o.
Fit~ld & Pool
Hin. )
Screw Cap
In Concrete Plug
Ft. in.
\Ú;lds
~
~
()
5'./ r'./ò. c e
, \~ith Cement
ý'. Oth~r
INFOR:tATIOrl BEAIJ\..'ELnrD ) rl~I':CI'I:LY TO ~::d\!\ER Pl)ST:
( Lis t \'~1 ere 0 iff ere n t from F i 1 c In f 0 em a t ion)
Operator í-{VlIOV\ I] I I ('~I
\'¡ell Numbc r 1J. J
/JJ"~.'7IFt.12-b, 3B\.iJ Ft.,~~,
:0 AAC 25. 170: LOC^ [ION CLE:\~;-UP rV'ð VV\.
PITS:
Filled In , Liners Remùvèd or Buried
Un i t () r Le.lsc ::.lme V~~ \
, Surf.lc.e Locdtion o[ \!ell:
See q ,T 'Z1J 1L, IUD-}6L,
fJ 5 Ú>--f2-,
n. \ 1:1:1
, ¿\ 0 ~ ~ .'
c::::; j-{
""'--
/"'ocu r is Removèd
~
SURFACE OF PAD A::D/()R LOCA r [0::: I /"
Rough, Smooth V, Contoured~, Flat
Other
C
, or:1pac t~{1
/,
CLF.A~~ UP OF pn ^:m/()i'~ LOCArlOU:
Cle<ln V", Pipe Scrap, Iron Scr.1p
Paper, Other
, \'!ooJ
, l.llI d
, CClIIènt
SUR ROm:) D~G AREA:
Wooèed .~ Brush
Sand, Other
, TunJ ra v: Greis,,>
, Dlrt
, r.ravcl
CO~o [TION SU/{f{lJU~:D I ~;(; J\/U:t\:
......-
Clean --.IL", Trash £ro\1l Site
Other
, T reI.! s <1 n d lor B r u s It [r OU1 C 1 e d r III ~ ~ 1 t è
ACCESS ROAD:
Dirt , Gravel
~ Ice
, Other
COtIDtTIOì: ACCLSS ROAD A>:D SL:I\I~(Wj:!)~~:C: ~
Cle,111 ~ H.ollt;h , Slllootil , Tr.1~h [rdll} Op.-'r.1t1l')11<; ~
--- --
Trees ans!L..or Brush [rom Clcaring ¡{OdU , ~poil [rom Cle.J.rlng lZoa<.l
Other 'l¿ "ff ì"'- J"
.EMAIt-:WG TO tiE )O¡~E: O"-;;'f/I :1/ lYJU,! /VV¡'I/ l:,.Rv~ -Þ /1<;/1:'/," ; $jV"/;'ý
:CCOHttr::\IJ, APPROVAL 1)1' AIlANIH)Nt'lI:ta: Yes , " ;-to -.d Fina I 1n "I"'c tton
,NSPI,CTED BY Ì1:'-é) ~;u&:; f U S;t~f /6 ' --'
15/26/81 /
r'
...,~~ /'~:;'-~
c... - /---
¡MIl.:.
/0 -ó2 '!!l /
Ukl\O~
Co's
IRA\LR\ D 6E .::t=Þ- \
OIL
P,cNHtÞ
T~be.h
'0. z..~1
(1)"'.,,,/
, 'r'" .'
:, ~,~.3,",~
1r1e.ll
,,-
,r,' ~ .
r,~P' 1\. ,.;:
,. ",'" ,.11...." ,
..,/-, :~-,., ,
"'- ,..>- . ,-r
- - or.... ,-;-- ø "
,- fl' ~?:~_. "f¡",,"'S¡~~¡',
, ..'. ", ' ,,' ",.r ~> "A;.-
.. .( 1" J""""{"""'~ 'h'
;"7'1"""" '-~~
.f :'\:'-:i ?-I~ ~ ~ ',;¡ - - -I("'" ._~..., . :¡;~
~ ;'jTj'--, "ç.w "~~" -i~)' .
~":"J ',~}' .~. ",}-~.r.r:;;"~ ".,¡"
, '¿ (-ff /"" t"") .-' ...,.-\ -"f"""""
". ~'~'I,~:...,'~:,~,~\íl""~,;#",,' ~
/ . '.1 .." " . "'~~' # ~.A 'ß.
r . , ~T" ". '.J ". ::A.!!f1'~... OJ. '
,,- ,'"- - ó. . ~.... -"! -
'i
)
)
~
L..~
k.~~
cÞ.~W
4Q~
~
¡@
, ..
L
-? "~ -.---.----- -- ------
L.Oðl:tf\,
~.~~
s.-\oc..k f" \ecl
i
J
.,.
"'"
~,
"
....
'--~e k å!" !Þ.~
N
,...
- ~\.ck.f\c.l
\v.W' ~.
r
..
.~ð
t. 1"'9 t.~3
~~t.M t
p-:1J
jO ""3 tS"i1
.r"~
"".' f¡pJlI ,...---
(g>
L..~
~.'+h
----------------- ----- ---- - --- ------~- -
---- --- - -- --- -
---- -_.-.------ - ---
r"N
(01 '1r1)
4 ..... ~f' . d
,
-.~
f"~
~,,~
JO jt9
r- J J-8 ~~ t~'Ø9
fMW "-r¡n\<J
..
., '
J
f"'.d to r' (."~f"-I1 f"~
~, ~OCIÞ;
,....
~
.
- -- - ----
--
. ?:-30-Z;;'-
( STATE OF ALASKA (
ALASKA 61L AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1
DRILLING WELL 0
COMPLETED WELL IX
OTHER 0
2 Name of Operator
UNION OIL COMPANY OF CALIFORNIA
7 Permit No,
79-72
3 Address
PO BOX 6247
ANCHORAGE AK 99502
8 API Number
50- 283-20065
4, Location of Well
1069.58'S & 329.03'W of the NE Corner,
Section 9, T20N, RlOW, SM.
9 Unit or Lease Name
TRAIL RIDGE UNIT
10, Well Number
TRAIL RIDGE III
11 Field and Pool
5. Elevation In feet (indicate KB, OF, etc ) 6 Lease Designation and Senal No
216.6' above MSL ADL 56870 WILDCAT
12 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF:
(Submit In Triplicate)
Perforate 0 Alter Casing 0 ' Perforations
Stimulate 0 Abandon 0 Stimulation
Repair Well 0 Change Plans 0 Repairs Made
Pull TubiOg 0 Other ~ Pulling Tubing
(Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion)
13 Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25105-170),
The final site inspection of Trail Ridge III needs to be postponed to next
summer, per results of site inspection on 10/2/81 by Doug Amos, OGCC.
This additional time was requested by Doug Amos and Jim Tr~mble, OGCC.
(Submit In Duplicate)
0 Altering Casing
0 Abandonment
0 Other
0
0
0
0
RECEIVED
N k Reported
Subsequent ì;~ 4~ 2. Dated :i:-/2a/Lv
on Fonn No -
NO'J ~) 5 1 ~:' ': 1
AJaG:<a Oil & Gas Cons CfJmrn. .
Anchor2a~ .. !S~Hon
'O;¡-
14. I her by certlf~ tha,t Ï!) fOr?)~g ntre and correct to the best of my knowledge
S,gned V\. l W'J¿Ü,A dJA/" T,"e DIST DRLG SUPT
The s~IcJbelow for CommisSion use
condl6/ns of Approval, If any '!his abandoned location W3.S inspected by our representative on 10/02/81
and additional clean-up of mud will be necessæ:y. Approval is given to finish this
clean-up in the SUInIær of 1982. '!his approval is given until 08/30/82. A subsequent
inspection will be necessa:ry before that date. ~-.; j
App,oved by OR! G NAL SI CHED COMMISSIONER ~:e ~::'~;:':"on Date~( J30 ¡<fl.
Form 10-403 BY LONNIE C. SInH Submit "IntentIons" In TrlPlicate-
Rev 7-1-80 and "Subsequent ReportS" In Duplicate
Approved :-opy
Returned
1//.9~JI
Date 11/25/81
, ;-(t:""~""'.T<~, " ' '"
,
:"'~~"':~~,"'T"~,,,U.:;.~ 11 ~~\' ~:, ,~;
'~"~""~~" JII1IIIII'I'.
,1.
.
DRilLING WELL 0
COMPLETED WELL []
OTHER a
~
!1~;
q'
L.-
.~
...\,.-.:: ,
:¥i-ßi;' ~,
'^77' ~\
~,\".': '(' <
'. .>f."li., -iÞ ,
I-" .
,t ~"",'ß~t*~" ,.;-œ.Þ STATE OF ALASKA ~-
" ~~'~~~,"ÄI!AS~LANDGASCONSERVATION C.MISSION '
~fSÙNDRY NOTICES 'AND REPORTS~'ON WELLS
-+
.
3. Address
PO BOX 6247
ANCHORAGE AK 99502
7. Permit No.
79-72
8. API Number
50- 283-20065
2. Name of Operator
UNION OIL COMPANY OF CALIFORNIA
4. Location of Well
1069.581S & 329.031W of the NE Corner,
Section 9, T20N, R10W, SM.
9. Unit or Lease Name
TRAIL RIDGE UNIT
10. Well Number
. Trail Ridge Unit #1
11. Field and Pool
5. Elevation in feet (indicate K8, OF, etc.) 6. Lease Designation and Serial No.
216.61 above MSL ADL 56870 Wildcat
. .
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate)
Perforate 0 Alter Casing 0 . Perforations
Stimulate 0 Abandon ~ Stimulation
Repair Well 0 Change Plans 0 Repairs Made
Pull Tubing 0 Other 0 Pulling Tubing
(Note. Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of star1ing any
proposed work, for Abandonment see 20 AAC 25.105-170).
(Submit in Duplicate)
0 Altering Casing
0 Abandonment
0 Other
0
0
0
0
Request change of status of Trail Ridge Unit #1 from suspension to abandonment
effective August 1,1981.
Î~.ç:l>. ~t.- '. \ -L / - r:\ ~ ~ /2--- n -a t
.... J ~-1Ivt) Oa.lftl- "t d ~} ./
\... \it ...) ~ ~
So ¡-Ç s~ al~-\Mt ~.,t '-4
'> ..... --r Tl ~ ¡.þ \ \ ....J.. ~ ... Õ J """
Ao(t~~l:- &.~ J-¿ - 14- ~, . ft.)
RECEIVED
JUL a a 1881
AlasIca Oil & Gas l,\>tI~ \./vtu,Ulssion
Ahòhorag8 -
:::~~ebV ertif thM t~1!¡¡lf ¡:2::::I~f :: S~~I;~. S U PI.
The spa elow for Commission use ÅprMVM Cory
Condlt,ons of App<oval, ,f any. ~ ~d<ft
ORlelRAt SIGNED" '/ d
BY LORN IE C. SIITB
Date 7/27/81
Approved by
Form 10-403
Rev. 7-1-80
By Order of
COMMISSIONER the CommisSion
Date ~.2 ~ I ,<1/
Submit Inte ti ns" In Triplicate
and "Subs ent R orts" In Duplicate
.
c
,
( .
II
j
Abandonment Detail:
A. Cement plug from surface
to 150' in 9 5/8" csg.
¡ B. Estimated top of cement
i isolation plug @ 3620'
, C. Howco Ezsv cement retainer
t set @ 3900' DPM.
D. Howco Ezsv cement retainer
set @ 11,895' with 100 sx.
of cement squeezed below.
-
. .
.
-
A
. .
-
~
Detail of Fish Left in Hole:
III 7977' - 8073' in Ii 1/4" hole.
I #2 10,565'-10,.154' in 12 1/4" hole.
i 113 10,678'-10,830' in 12 1/4" hole.
. 1/4 13,312'-13,404' in 8 1/2" hole.
, 1/5 12,141'-13,210' in 8 1/2" hole.
i 1/6 12,154'-13,708' in 8 1/2" hole.
¡
I
~
1
j
~
s
I
i
II
B
.
.
. .
<# .
C
-----
~
-
~
!
D
---
t
~ .;
.
- 30" 157.511 Plain end drive pipe
@ 110'.
- 20" 94# H-40 Buttress csg. @ 982'.
.
. .
- 13 3/8" 61# & 68# K-55 Buttress esg.
@ 4008'.
: ," . " 9 5/8" 47# N-80 & S-95 Buttress egg.
- "-
@ 12,028'.
. .
'. . .
"
I
,
i
WELL SCHEMATIC
TRAIL RIDGE UNIT #1
. 1'.('(.
I-
I
DATE
('
I
I
DRAWN
"""'0,
SCALI
DATE
CKD.
.
t
!
I
. Spud:
5/31/80 COMPo 12/13/80
-, - - .
UNION Oil COMPANY OF CALIFORNIA
,
~
.. - .
FORM 247 (NEW !I 661
,
I
SHEETS I ~HeET
~
," .
...
" .>
.~
. -
.
, - '
(
(
UNION OIL COMPANY OF CALIFORNIA
Cannery Loop Unit 11
Trail Ridge Unit #1
-', .-.--..-.,.'- ...
Big River Unit 11
Clam Gulch Unit t1
Figure Eight Unit 11
Redoubt Bay Unit 11
.-....
SUSPENDED
PLUGGED & ABANDONED
~
,
.
-
,
(
('
ÍÁ rl~' t I' -;7- ~'/,;
June 4,1981
Union Oil Company of California
P. O. Box 6247
Anchorage, Alaska 99505
Re:
Alaska Oil and Gas Conservation Commission
Regulations Article 2, ABANDON~1ENT AND PLUGGING,
20 AAC 25.120 \'7ELL ABANDONNENT r-1ARREH and
20 AAC 25.170 LOCATION CLEAN UP.
J
Gantlemen:
In regard to the above referenced regulations, your attention
is called to an attached list of wells which, according to our
records, have not received a final location inGpcction and
approval of clean up. In compliance "lith 20 AAC 25.170 Section
(a), "Within one year of suspension or abandonment of an on-
shore ~lcll", all clean up \\York is to be finished. Section (b)
provides the means for an extension of time if a valid reason
exists. Section (c) provides for on site inspection.
Consequently, we arc presenting the followinq list of your
abandoned and/or suspended wells. Many of these arc now ~ore
than one year old and arc not in compliance with regulations.
Others should have the final inspection completed this summer
while ~roather permits. This list covers the years 1975 to
dûte. There may be SOMe earlier wells that also need inspec-
tion. If you have any earlier wells to be inspected this
summer please inform us.
Therefore, we are requesting a schedule from you for this
summer \"hen our field inspectors can accompany your representa-
tives to these sites for the final clean up inspection.
Yours tr~, -1
j~~J (~ / ~tL
Lonnie C. mith
Commissioner
LCS/JKT:œ
, )".
1 "ì.~,.~,'
\,,':t'..r:;¡; ~."',
",\!íi;.f;,¡,;,¡. ,i ,", - '1><
¡¡"..-",:¡¡;",:"i '";{', "<.-,
.
Exploration Department
Alaska District
,', t- ;~
,jsíti""'~~'.t """,~'
. , - .
, ' .
'",
~~. ..'"
:r . ~ij:
t ft
(
Union all and Gas D¡-.~Ion Western Region
Union all Company ~I ':;allfornla
P a Box 6247, Anchorage, Alaska 99502
Telephone (907) 276-7600
unl8n
February 13,1981
Mr. Wm. Van Alen
Petroleum Geologist
State Div. of Oil & Gas
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Van Alen:
Union Oil Company of California is requesting that all
materials submitted to the State of Alaska from the---
UNION,_Trail Ridge Unit #1 well be held in utmost
confidentiality" for-theÏñãXìÎnum allowable period of
time. In addition, we would appreciate being notified
prior to the release date of this information in order
to evaluate the possibility of extending the confiden-
tiality period because of pending lease sales.
Attached is a document of transmittal listing the
logs, samples and surveys submitted. If you have any
questions, please contact me.
, ,I
" ~., ,~,...
¡ , J. t.' "
, ' "",
Yours truly,
~ ¿;:(. 7C/#-J
Nowell A. Briedis
Exploration Geologist
NAB:ch
Attachment
r E(r IVED
FEltS-
II" J..... .t.' ¡ n:1 ~,_n1.
, ~ - ra -.rl (( ,). -., . ¡ .
Mc*0f8II
(
(
CONFIDENTIAL, SECURITY CLASS I
UN TON, Trail Ridge Unit ~l
1 blueline & 1 sepia of:
r
Document Transmitt'll --~
Union Oil Company of C ,rnld I COMM
, ¡ CO'vi'" -~'"
unlen NO. ~I CO\\'A ~I/~
I R ~S ; I ~ j
DATE SUBMITTED ACCOUNr,I"<fM~TH I...
2/4/81 _L2~N(,~
, a ~~~'~4-
FROM I -, ,-'
/4ENG
D. M. Courtis{j--ldÉ~tj-)
AT j I 2 GEc5f!'
UOC - Anchoragel- /--3 GEOL --
TELEPHONE NO : __I ST/\T i
: I STA{T~C -
! --~. r==--l
COI\IFER: f
FILF. --
. ¡
TO
Wm. Van Alen
AT
State D.G.G.
TRANSMITT ING T HE FOLLOWING
7" nIL-Linear c'orrelatior. Log.
2" DIL-Logrithmic
S" nIL
2" & 5" BHC-Sonic
2" & 5" Density-Raw Data
2" & 5" CNL/FDC
Sidewall Core Log
Mudlog
LIS Tape
Directional Survey
1 complete set ditch cut~ings,
11 boxes
Chips from Core #1 (12370'-1239~')
~t{~
~ C:/ý~
4.,~ ~S I 'b
"#~Q a 19.
~ ~$là '8/
£h1 ' 'I f'" 1r(' , -, ",' ""r-'~,á'
-,11, ',I':' ',. ,~ I ,:' "3}ñ-..
. . ..1 ,! ,. I r,-- '1 ,i'tl\~ -q
~': "l¡;;~ff~ d i='" ..
FORM 1-2MO2 (REV 11-72; ,",'?::-11. ~ 'If
unl~n
Union 011 and Gas Divison. Western Regior --l~¿g~~
Union 011 compa( ::>f California I COMM' .
P.O. Box 6247, Ancnorage, Alaska 99502~1 FI RES EN_G_-
Telephone" (907) 276-7600 ~I 1 EN~ '-
2 E~Gc;1J~~
- - I 3 ENG
14EÑG
. c..~EOl
r;~W
.ISTATTEC
-r STATfËc
I
" !:ONFER:
Flll=~
~anuary 23, 1981
-'
.
('
Robert T. Anderson
District Land Manager
Director, Dept. of Minerals
& Energy Management
703 West Northern Lights Blvd.
Anchorage, AK 99503
Atten:
Dorothy Bassett
TRAIL RIDGE UNIT
State of Alaska
Plan of Operations for
Trail Ridge Unit #2 Well
Gentlemen:
Reference is made to subject Plan of Operations presently before you
for your approval. Due to certain unforeseen circumstances the Trail
Ridge Unit #2 well will not be drilled this winter. Please disregard
........~-
said plan.
Very truly yours,
r~ ~ ,- ~I'.
+~~~! ~ áq~
Richard J. Boyle
Landman
RJB/bde
cc:
Hoyle Hamilton
Alaska Oil and Gas Conservation Commission
Bruce M. Barrett
State Fish and Game
Kyle Cherry
Dept. of Environmental Conservation
Jack Wilds
Division of Land & Water Management
RECEIVED
,
JAM 2 6 1981;
AMMa Oil & Gal Cons. w.umllston
ADcborag8
STATE Of ALASKA ~
ALASKA( LAND GAS CONSERVATION ccf MISSION ~
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
])
t
~
1 Drrlling well ¡j{
Workover operation 0
2 Name of operator
UNION OIL COMPANY OF CALIFORNIA
7 Permit No.
79-72
3 Address
P.O. Box 6247, Anchorage, Alaska
99502
8 API Number
50- 283-20065
9 Unit or Lease Name
TRAIL RIDGE UNIT #1
4 Location of Well
at surface
1068.51'S & 381.51'W of the N.E. Cor., Sec. 9,
T10N, RIOW, S.M.
10. Well No.
#1
11 Field and Pool
Sec. 3, T20N, R10W, S.M.
5 Elevation In feet (indicate KB, OF, etc) \6 Lease DesIgnation and Serial No
216.6' above MSL ADL 56870
For the Month of
DECEMBER
, 19 80
12 Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
**SEE ATTACHED
13 Casing or liner run and quantities of cement, results of pressur'3 tests
N.A.
14 COrIng resume and brief descrIption
N.A.
15 Logs run and depth where run
N.A.
N.A.
RECEIVED
JAN 1 Õ 1981¡
,16 DST data, perforating data, shows of H2S, miscellaneous data
Alaska Oil It t.2dS CQnb. \J\.I",m8~/on
AnGhor.".
17 I hereby certify that the foregoing IS true and correct to the best of my knowledge
, ~' 0 C l\l\ ..~ Dist. Dr1g. Supt. 1/12/81 I
SIGNED"" ", ". t2\)VO~ , TITLE DATE
NOTE--Rep on this form IS required f eaci/calendar month, regardless of the status of operatIons, and must be flied In duplicate with the Alask()
011 and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed
Form 10-404
Rev 7-1-80
Submit 10 duplicate
("
('
ATTACHMENT
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
DECEMBER 1980
12. **T.D. - 13,708'
E.T.D.- Surface
Stuck d.p. at 12,649' while making trip from
13,708'. Backed off drill pipe at 12,447'.
Screwed into fish with jarring assembly and
stuck fishing tools up to 12,160'.
Backed off fishing string and left the top
of the fish @ 12,150'.
Abandoned lower portion of hole w/100 sx. of
cement squeezed thru retainer set @ 11,895'.
Spotted 100 sx. of cement on top of retainer
set @ 3900'. Cemented from 150' to surface
w/55 sx. of cement.
Cemented 9 5/8" x 13 3/8" annulus w/l430 sx.
cement.
Installed abandonment post and suspended well.
,.p~c.
, ~4' ~/!/.
~ lð' Ii ~Ô
'* 'J., ~O~
..,~ ' ~
~~~t:. '\.
~~.
"t.,.
'.
"11.
~t$'.
1ðl)
- - - - - - ---
-- - - .- - ---- - - ---
" I
\ STATE OF ALASKA ~ "\
ALASKA AND GAS CONSERVATION G.{: ASSION
WELL COMPLETION OR RECOMPLETION FcÉPORT AND LOG
1 Status of Well
ClaSSification of Service Well
OILO GASO
2 Name of Operator
SUSPENDED ~
SERVICE 0
ABANDONED 0
7 Permit Number
UNION OIL COMPANY OF CALIFORNIA
3 Address
P.O. BOX 6247, ANCHORAGE, ALASKA 99502
4 Location of well at surface 1069.58' S & ~ 03' W of
~ Sec. 9, T20N, R10W, S.M. 3 ~
At Top Producing Interval
1983.01'N & 4417.56'E of surface
79-7?
8 API Number
50- 783-20065
the N.E. Cor.,
9 Unit or Lease Name
TRAIL RIDGE UNIT
10 Well Number
TRAIL RIDGE UNIT #1
At Total Depth
11 Field and Pool
WILDCAT
5 Elevation In feet (indicate KB, DF, etc )
216.6' Above MSL
6 Lease Designation and Serial No
AnL #56870
12 Date Spudded 13 Date T D Reached 14 Date Comp , Susp or Aband 15 Water Depth, If offshore 16 No of Completions
5/31/80 11/19/80 12/13/80 feet MSL
17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+1VD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of Permafrost
13,708'MD,12,626'TVD Surface YES ~ NO 0 feetMD
22 Type Electric or Other Logs Run
DIL-Sonic-GR, FDC-CNL,
23
Dipmeter, Velocity Survey, SWS, Gyro Survey
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM
Surface 110'
Surface 982'
Surface 4,008'
Surface 12,028'
CASING SIZE WT PER FT GRADE
30" 157.5#
20" 94# H-40
13 3/8" 51# & 68# K-55
9 5/8" 47# ~-80,S-95
CEMENTING RECORD
AMOUNT PULLED
HOLE SIZE
Driven
26"
17~"
12!t;"
1850 CF of Slurry
3350 CF of Slurry
2000 CF of Slurry
24 Perforations open to Production (MD+TVD of Top and Bottom and
Interval, size and number)
25
SIZE
TUBING RECORD
DEPTH SET (MD) \ PACKER SET (MD)
REtE IV.ED
JAN 1 3 1981
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
. . .
Alas\œ on & Gas Cons. Commlsaion
Anchorage .
27
Date First Production
PRODUCTION TEST
Method of Operation (Flowing, gas 11ft, etc )
Date of Test
PRODUCTION FOR 01 L-BBL
TEST PERIOD. .
CALCULATED... OIL-BBL
24-HOUR RATE .,..
CORE DATA **
CHOKE SIZE
GAS-OIL RATIO
GAS-MCF
WATER-BBL
Hours Tested
Flow Tubing
Press
GAS-MCF
WATER-BBL
OIL GRAVITY-API (corr)
Casing Pressure
28
Brief description of lithology, POroSity, fractures, apparent dips and presence of 011, gas or water Submit core chips
**
Conventional Core:
12,370' - 12,400', recovered 28' 9" of 30' attempted.
sandstone and siltstone with interbedded claystone
No Oil or Gas.
Lithology was very fine
and coals.
Form 10-407
Rev 7-1-80
;
. I
Submit In dupltc1
I
CONTINUED ON REVERSE SIDE
\
\
~
,
....
1
))
~
/
I
~~';-"" ,. -.-' -;. : ,If v.. ~,
rr -""",¡;rj'!7 ,TO ""-~>~
r1
" .~
)
} -:~.i
. -~"---"'1-""
.. \ . '\
\
C-~
l'
\
..,~
, "..;
...
29
30
,
GEOLOGIC MARKERS
FORMATION TESTS
,
MEAS. DEPTH
TRUE VERT. DEPTH
Include interval tested, pressure data, all fluids recovered and gravity.
GOR, and time of each phase
NAME
Top tertiary
6750'
6109'
NONE
31 LIST OF ATTACHMENTS
32
I hereby certify that the foregoing IS true and correct to the best of my knowledge
Signed
~.-. C<. C\.ðOo~ Ie ~
Title
Dist. Dr1g. Supt.
Date
1/12/81
INSTRUCTIONS
General: This form IS designed for submitting a complete and correct well completion report and log on
all types of lands and leases In Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam Injection, air injection, salt
water disposal, water supply for Injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state In item 16, and in item 24 show the producing intervals for only the Interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas I njectlon, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
¡:::,...,rm 1 n.i1n7
J
~
~Ht'::::T ^ ~
P/\GL NO.
/(1
SPUD DATE ___5/31/80 - COl\lP. D.'\T!~ __12/1lL~to_-
CO! ¡TnACTOIL~.:i~kerhoff -- HIG NO.2.2.__-
TYP;~ u;:nT______Oi1w~11 96
D1UI,L PIPE D~I:~)Cl~IPTION
....
......
Ui\L 'í"j O~L.. C':). (~)í:- C/\t.l(= '- l~r"1 ~l\
Vv'l:LL : : :::CO~1D
, Sf' Trail Ridge Unit ,t°r,I I 'IO 1
f',¡\, .'J ------ --1- - It 1'.. I l' . ----
. rr Eight Mi e Lake Prospect
f --'- .1) ----- --------- -- .------
,OCATION 10!!9.58'S & 329.03'_~of the N.E.
corner of Section 9, T20N, R10W '-- S. M.
5" G and E
--
-----
----
----
ELEV.'\.TIOr-¡S: \V.\TElt DEPTH
)J~:\,1TI'.i; NO. 79~72 SEIU1~I~-¡O. ADL 5.6870 H. T. TO ?~E:~~~ I~LOOH
L'.D.---- 13,708 ----- T.V.D. _~2, 626' - r, .. ~1. r'l 1 0 ¡,~ MSL
)EVIA TION ([3 ILL.) 1983' N - & 4418' E of surf. loc. r' 11.)1. 1 0 ~..llLL 1)1~CI~
=:O!\IPANY E:-~GnIEER Graham, Allen, Wester, n. T. 1 ~ I nq.k)Y~TIO~~ DECK
Boulware, Watson ArpnOVl~D: c....~ -
-:...- ~ - - =----=r.==--->..-~..L.~'--=-=-=_._- ,- ----~oo;oG--~---;;I~~n,~~?~ ;;J~~-J~"Eco1~-----"'--"""""'-"or-,--
~~q_~_ì~If~r~~1 . ~l~i~E-'~*a~_Ga~Dè~----'- Dftð-P ~~¡v-e~-~~t~-;e-lmag u-2iiji~~~~:
lU" - ~411 . tluttress H-40 ----~82 ' -cmt'd w/lO80 sx. w/add. --rIîarn-t>jð1r:--
3 3/8" 6l#t068# Buttress K-55 4008' Cmt'd w/1850 s~. wi add. (Gmt. returns to surtace)
5/8" 47# - Buttress i-80 & S-95_~12,028' 'Cmt'd w/l200 sx. w/add. (Est. top ot cement @ 6500'~
?16.6'
-,=~aora:=..-.~"""--~'
. - ---------
---- I -
We 11 plugged and sus?ended w/1 00. sx. of ('.mt. sql1e.p7.~èI tþrn rptAi npr @ 11 t 895' ,100 sx.
~~.9( c.!!!t===S1)ot.t.gd OJLj:-QP.dL.f-=r,.,e.taipJ.~I:-..@_).9.Q)~- a.!l~ ~~-~~9..t...~1!!~. s.£2g~..1!.2El_J:.?_Q..~-!0 surf~.ç~.
PIill[Ql.:V~'IIJ:LQ RECOH_D_-
_R~Qlr- --
-.D. b T.J~
I lIT. D:l~i A-L-
E.T..D. .
-
p n kS E U.:LJ~- Qli 12 IT L 0- N
---
--
---
---
~~~.,
....
. -
----
---
Dð,TE_- InT~f\V"r.
-'-~ -
INITIAL P1{ODUCTION
N£:T OIL I CUT - GRr' v~- c.i--- 1:.P~- -,- CÚOë-=F.:--1,'¡C'ê
-- --..--
GOl
1 .
R FM Þ...RJs:$
--
. --. --
\V~LILHEAD--A-_Sfu;.MBL Y
TYPE:
~r::lY Oil Tools
TS-A 20" SOW x 20" 2M w/2 - 4" Outlets
CASING HEAD:
, .
CASIKG HANGER:
20" x 13 3/8" slips.
TSM-A
20" 2M Studded x 13 5/8" 5M w/2 - 3" SM. studded outlets.
CASING SPOOL:
TUBING HEAD:
TUBING HANGER:
TUBING HEAD TOP:
--
RECflVEñ
JUN 1 5 00'
---1t1ãcl- -_?.1IJ4:H-- -- -----
3ska Oil & G ,.,
aoJ Cons C
Anchorag~ olr¡mlSSion
fv1i\STP.H VALVES:
CI'II\!ST~.rAS THEE TOP CONN.:____------
- .----
]
t\ /
/
l£;,SE
TRAIL RIDGE UNIT
DATE
ETD
JTS
1
22
23 Jts.
JTS
1
25
75
101 Jts.
~~
UNIC:l OIL Ca'pfJrY OF Q\LIFCPJJIA
\ tELL ¡ ~ECCf1J
tELL r:o.
1
'wi
S~L..r:-r D
P ..."
AGL !;o.
FIELD EIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.f'\TIONS, DESCRIPTIOilS & RESULTS
TRAIL RIDGE CASING DETAI~
20" 9411 H-40 Buttress Casing
DESCRIPTION
20" B&W Float Shoe
20" 9411 H-40 Butt. Csg.
20" B&W Stab-in Float Collar
20" 9411 H-40 Butt. Csg.
Gray 20" Fluted Hanger
Gray 20" 2M Csg. Head
Landed Below K.B.
LENGTH
2.00'
42.12'
2.31'
908.91'
1.00'
1.67'
24.00'
Total of 20" 9411 H-40 Buttress Casing
13 3/8" 6111 & 6811 K-55 Buttress Casing
DESCRIPTION
LENGTH
13 3/8" B&W Float Shoe
13 3/8" 6811 K-55 Butt. Csg.
13 3/8" B&W Stab-in Float
Collar 2.20'
13 3/8" 6811 K-55 Butt. Csg. 1002.05 '
13 3/8" 6111 K-55 Butt. Csg. 2899.77'
13 3/8" 6111 K-55 Butt. Cut-off 37.78'
20" 2M x 13 5/8" 5M Spool 1.50'
Landed Below K.B. 22.5'
1.80'
40.90'
TOP
980. 01'
937.89'
935.58'
26.67'
25.67'
25.67'
-0-
BOTTOM
982.01'
980.01'
937.89'
935.58'
26.67'
24.00'
24.00'
TOP BOTTOM
4006.20' 4008.00'
3965.30' 4006.20'
3963.10' 3965.30'
2961.05' 3963.10'
61...28' 2961.05'
23.5' 61.28'
22.5' 24.00'
-0- 22.5'
Total of 13 3/8" 6111 & 6811 K-55 Buttress Casing.
'--"
~
S~Lr:r D
P -"
AGt:. !;o.
UNIC;J OIL Ca'ppJN OF O\LIFCRrJIA
\ ELL ¡ ~ECC!,'lJ
w,SE TRAIL RIDGE UNIT
\'.ELL. î:O I
1
FIELD EIGHT MILE LAKE PROSPECT
Il\TE
ETD
DET,\!LS OF OPEP.¡'\TIONS, DESCRIPTIOilS & RESULTS
TRAIL RIDGE CASING DETAIL, CONT.
9 5/8" 4711 N-80 & S-95 Buttress Casing
JTS
DESCRIPTION
LENGTH
TOP
BOTTOM
9 5/8" B&W Float Shoe 1.62' 12,026.38' 12,028.00'
2 9 5/8" 4711 S-95 Butt. Casing 92.06' 11,934.32' 12,026.38'
9 5/8" B&W Float Collar 1.65' 11,932.67' 11,934.32'
79 9 5/8" 4711 S-95 Butt. Csg. 3417.86' 8,514.81' 11,932.67'
209 9 5/8" 4711 N-80 Butt. Csg. 8473.03' 41.78' 8,514.81'
9 5/8" 4711 N-80 Cut-off 17.28' 24.50' 41.78'
Landed Below K.B. 24.50' -0- 24.50'
290 Jts.
Total joints of 9 5/8" 4711 N-80 & S-95 Buttress Casing
- ..
w\SE
DATE
----
4
5
6
'-"
\....1
S~~q D
P ..."
AGt.. !;o.
U~HC;J all ca.pfjrf OF CAlIFCRrlIA
\ jELL ¡ :ECC~ill
TRAIL RIDGE UNIT
- \',ELl r:o.
1
. - FIELD EIGHT MILE LAKE PROSPECT
,
t ETD I DETAILS OF OPEP.f\TICNS.. DESCRIPTIOilS & RESULTS
.'- _.._+-~ - -..-.---..~~~---- --- - _0___- ---- - ----~
, .
A
B
C
D
E
F
G
H
Commenced rig-up of Brinkerhoff Rig #59 @ 00:01 hrs. 5/19/80. Cont-
inued rig-up thru 5/24/80. Rigged up and drove 30" drive-pipe, using
Delmag D-22 drive hammer, to a depth of 55'. Had 23' of soil pene-
tration and final hammer rate of 300 BPF.
I
Continued general rig-up. Strapped off 30" drive pipe. Cleaned out
drive pipe to shoe @ 53' and drilled l7~" pilot hole in boulder below
30" drive pipe to 56' in 9 hours.
J
Drilled l7~' pilot hole f/56' to 110'.
110' .
Opened hole to 26" f/55' to
K
Drove 30" drive pipe from 55' to refusal at 110'. Refusal was 288 BPF
Cut-off 30" pipe and installed flowlines. Cleaned out 30" pipe to 104
L
C.O. drive pipe f/l04' to 110'. Had some junk at shoe of 30" pipe -
cleaned out junk. Surveyed @ shoe of drive pipe. Installed 30" hub
and 20" 2000# Hydril.
1
5/31/80 Installed flowlines. Spud well @ 6:00 hrs. 5/31/80. Drilled l7~" holt
481'/371' f/llO' to 233' w/bit #4 on BRA #1. Stuck pipe. Worked pipe free and
30"D.llO' drilled l7~" hole f/233' to 481'.
.. "
2
6/1/80 Drilled from 481' to 497'. Circ. clean and Pooh. RIH w/bit #5 on BRA
687'/206' #2 for Dyna-Drill run #1. Oriented tool and dyna-drilled f/497' to
30" D.llO' 687'. Pooh w/D.D.
3
6/2/80 RIH w/bit #6 on BRA #3. Directionally drill17~" hole f/687' to 996'.
1020'/333' Plugged bit. Pooh. RIH w/bit #7rr on BRA #3 and directionally
30"D.llO' drilled l7~" hole f/996' to 1020'. Circ. hole clean and Pooh. R.U.
Schlumberger and ran DIL-SFL-SP log. Rigged down Schlumberger.
Removed 20" 2000 psi Hydril.
6/3/80 Install 30" riser. RIH w/BRA /14 and open l7~" hole to 26" f/llO' to
26" f/llQ'~798'690'. Pooh. Change hole opener and RIH. Continue to open hole to
30" D. 110' 26" f/690' to 798'. Down to repair washed out union in mud1ine.
6/4/80 )own to repair mud line$. ReaII}ed 26" hÇ>le to 798'. Hit bridge. Pooh.
26" f/798' RUi w/17~1i bit on BRA 115 and C.O'. f/798' to 1020'. Circ. and made
to 950' Niper trip. Reamed thru tight spot @ 690'. Bit plugged. Pooh and
30"D.1l0' ::.leaned bit. RIH and C.O. f/690' to 1020'. Pooh. Layed down 14 jts.
:>f HWDP and l7~" BRA /15. RIH w/26" H.O.
6/5/80
26"f/950'
to 1020'
30"D.llO'
RIH w/26" H.O. Opened hole f/760' to 940'. Circ. and build mud volumE
Opened hole f/940' to 960'. Pooh. Replaced bullnose on H.O. w/17~'
bit. RIH and opened hole to 26" f/960' to 1020'. : Made wiper trip -
OK. Pooh and layed down 26" BRA. Removed rot8:ry. Rigged up to run
20" csg.
LEASE
D.~iE
7
8
9
10
11
12
13
TRAIL RIDGE UNIT
,
-- I.
.
I
. -.
ETD
6/6/80
30"D.llO'
20"C. 982'
6/7/80
30"D. 110'
20"C. 982'
6/8/80
1134'/114'
30"D.llO'
20"C.982'
6/9/80
1598'/464'
30" D.llO'
20" C.982'
6/10/80
1847'/249'
30" D. 110'
20" C. 982'
6/11/80
2322'/475'
30" D. 110'
20"C. 982'
6/12/80
2608'/286'
30" D. 110'
20"C. 982'
'-"
~¡
S~b..CJ D
P -.,
AG~ !;o,
U~HC:! OIL Ca.prJN OF CALIFCRJH^
\ILL ¡:ECC~UJ
\\ELL r:o.
1
FIEill E~~T MILE LAKE PROSPECT
DET..\ILS OF OPEP.¡\TICNS~ DESCRIPTICilS 6. RESULTS
.---- ---~._-~- - ~ ., ---- -----. -_._----~.
Ran 23 jts. of 20" 9411 H-40 buttress csg. Set shoe @ 982', float
collar @ 936'. Landed csg. on Gray Oil tools fluted mandrel hanger
Ran stab-in sub on 5" D.P. and circ. mud. Pumped 50 bbls. water
ahead of 800 sx. cl. "G" w/2~" pre-hydrated gel and 2% CaC12
followed by 200 sx. cl. "G" w/2% CaC12. Displaced w/4.5 bbls. mud.
CIP @ 22:30 hrs. 6/6/80. Ùid not have cement returns to surface.
Removed 30" riser.
Ran 1" pipe down 20" x 30" annulus to cement basket @ 70'. Dis-
placed mud w/water and cemented annulus w/80 sx. cl. "G" w/2% CaC12
CIP @ 3:00 hrs. 6/7/80. Installed 20" 2000 psi x 20" buttress csg.
head. Installed 20" Hydril w/choke and kill lines. RIH,w/17~" bit
Tagged cement @ 934'. Tested csg. to 500 psi - OK. Drilled F.C.
@ 936' and cement to 961'. Tested csg. to 500 psi - OK. Drilled
cement to shoe @ 982'. Tested csg. to 500 psi - OK. Drilled shoe
and c.o. rathole to 1020'. Circ. and condo mud.
Dumped and cleaned tanks. Built new mud volume. Began circ. -
again contaminated system. Dumped and cleaned tanks. Circ. & Pooh
RIH w/bit 1110 on BRA 116. Directionally drilled f/l020' to 1134'.
Circ. and Pooh. P.U. and RIH w/bit #11 on BRA #7 for Dyna-Drill
Run #2.
Oriented dyna-drill and directionally drilled l2~' ftole f/1134' to
1267'. Pooh. Left 1 cone off bit in hole. RIH w/bit 1112 on BRA
#8. Directionally drilled l2~' hole f/1267' to 1563'. Pooh for
bit change. RIH w/bit #13 and directionally drilled l2~" hole
f/1563' to 1598'.
Direttionally drilled l2~" hole f/1598' to 1691'. Pulled 1 stand
of d.p. - broke T-latch on rig tongs. Rig down 6~ hours waiting
on replacement parts. Pooh. Layed down BRA #8. P.U. dyna-drill01
BRA #9 and RIH. Orient dyna-drill for drift angle increase and
directionally drill12~" hole f/169l' to 1817'. Pooh. Layed down
dyna-drill assembly. P.U. bit 1115 on BRA #10 and RIH. Reamed-
f/1786' to 1817'. Directionally drilled l2~' hole f/18l7' to 1847'
Directionally drilled l2~' hole f/1847' to 2194'. Pooh. P.U. Bit
#16 on BRA #11 and RIH. Dire~tionally drilled l2~' hole f/2l94' to
2322'. Pooh. P.U. Bit #17 on BRA #12 and RIH for Dyna-Drill
- .
Run 114.
RIH w/BHA #12 for dyna-drill run #4. Orient 60° Rt. of high side.
Directionally drilled l2~" hole f/2322' to 2424'. Pooh. RIH w/Bit
1118 on BHA 1113 (angle - building assembly). Directionally drilled
l2~" hole f/2424' to 2608'. Pooh. M.U. locked-up BRA #14.
lE;"\SE
TRAIL RIDGE UNIT
DAiF
. - .
IETD
-, -
- - ---
14
6/13/80
TD - 2700'
92' footage
JO"D. @110'
20"C.@982'
15
6/14/80
2797' TD
97' footage
30" D.@110'
20" C. 982'
16
6/15/80
2926' TD
2634' ETD
163' footage
30" D. @110'
20" C. 982'
17
6/16/80
2958'/324'
30"D.llO'
20"C.982'
18
6/17/80
3089'/131'
30"D.llO'
20"C. 982'
19
6/18/80
33111/222 '
30" D. 110'
20"C. 982'
"-'
-...../
S~~CT D
P - 'I
AG~ ¡;o,
U~\l I C;! 0 ILea 'Ffl rr OF U\LI FCRr 1 IA
\ ¡ELL i ~ECCRD
\'I~u. r:o I
1
FIELD EIGHT MILE LAKE PROSPECT
.1..
, --- ~~
I DETAILS OF OPEP./\TIC:NS, DESCRIPTlOiIS & RESULTS
---~~._-.-,,------ - _.. ---_._----- . -~-----~.~'-.----.r~-"
TIH w/Bit #19 on BRA #14 (packed BRA). Reamed tight hole w/packed
hole w/packed hole assembly from 2080' to 2608'. Direétionally
drilled l2~" hole to 2681'. Drill pipe torqued while drilling
& Kelly drive bushing jumped out of rotary table causing D.P. to
backoff. (NOTE: Driller did not notify anyone that Kelly bushing
had jumped out of rotary and caused backoff). Pooh. Recovered
190' of drill pipe. Ran OEDP & screwed into fish @ 190' - picked
up on fish & drill string 50,000# light. Pooh. Left total BRA
#14-lft-over sub on top of drill collars in hole. Top of fish @
2353'. Length of fish 328.31'. Ran OEDP - tagged top of fish @
2353' - OK. But unable to engauge fish. Pooh. Rigged cut lip
pin on bent joint of Grade "E" D.P. - engauged top of fish & Pooh.
Recovered total fish. TIH w/Bit #20 on BRA #15 (40' belly angle
building assembly).
Drilled 19' of l2~" directional hole from 2681' to 2700'. Drill
pipe torqued & Kelly drive bushing jumped out of rotary table
again causing D.P. to backoff.
Pooh. Recovered 431' of drill pipe. TIH w/cut lip pin on bent
joint of 5" - engauged top of fish @ 431' & Pooh. Recovered total
fish. Installed new Kelly master bushing pockets, Kelly drive
bushing pins, Kelly rollers and bearings. Dressed off edges of
'Kelly. TIH w/12~" bit #21 on BRA #15 (40' belly - angle building
assembly). Directionally drilled l2~" hole f/2700' to 2797'.
.. -
Directionally drilled l2~" hole from 2797' to 2799'. Took survey
@ 2754' 33ON57E. Hole angle & direction - as desired. Pooh for
BRA change. TIH w/12~" Bit #22 on BRA /f16 (packed BRA). Drilled
from 2799' to 2926' - took survey @ 2842' 38°N59E. Hole had built
50 & turned 20 right in 88'. Pooh. TIH w/Bit #23 ~n BRA #17 (15'
extended pendulum to drop angle). Started undercutting on low side
of original hole @ 2600'. Low side drilled l2~" hole from 2600' to
2634' .
Low side drilled - undercut f/2634' to 2680'. Pooh. RIB w/bit
#24 on BRA #18. Reamed f/2600' to 2680'. Low side drilled f/2680'
to 2772'. Pooh. RIH w/bit #25 on BRA #18. Low side drilled f/
2772' to 2926'. Directionally drilled l2~' hole f/2926' to 2958'.
Took survey @ 2958' bit depth. Pooh. RIH w/bit #26 on BRA #19
(15' pendulum dropping assembly). Reamed to btm. £/2900' to 2958'
Directionally drilled l2~" hole f/2958' to 3028'. Pooh. RIH w/
bit #27 on BRA #20. (20' pendulum dropping assembly). Direction-
ally drilled l2!¿;" hole f / 3028' to 3089'.
Directionally drilled l2~" hole f/3089' to 3200'. Pooh. RIH w/bit
#28 on BHA #21 (16' pendulum dropping assembly). Reamed f/3l70' to
3200'. Directionally drilled l2~" hole f/3200' to 3261'. Pooh.
RIH w/bit #29 on BRA #22 (packed hole assembly). Directionally
drilled l2~" hole f/326l' to 3311'.
6/19/80 Pooh. RIB w/bit #30 on BRA #23 for Dyna~Drill Run #5. Orientea
3405'/94' Dyna-Drill1200 left of high side for left hand turn & drop. Dyna-
30"D. 110' Drilled l2~" hole f/33l1' to 3378'. Pooh. "RIH w/bit #31 on BRA
20" C. 982' 1124 (16' pendulum dropping assembly). Reamed tool run f/331l' to
3378'. Directionally drilled l2~" hole f/3378' to 3405'.
20
,-
DATE 'Em I DETAILS OF OPEP.i\TIQNS, DESCRIPTIC:IS & RESULTS
- - - -- ---~- -,- ~ -~- - - -- - -- ~ ~- -~-,-
. I'
l£\SE
TRAIL RIDGE UNIT
21
6/20/80
3628'/223'
30" D. 110'
20" C. 982'
22
6/21/80
3774'/146'
30" D. 110'
20" C. 982
23
6/22/80
4007'/233'
30" D. 110
20" C. 982
24
6/23/80
4011'/4'
30" D. 110' f
20"C. 982'
25
6/24/80
17~" hole
f/982' to
2000' (1018'
opened)
30"D. 110'
20"C. 982'
26
6/25/80
4011' TD
17~" Role
f/2000'
to 2816'
opened)
30" @ 110'
20" @ 982'
27
6/26/80
4011' TD
l7~" hole
f/28l6' to
3298' (482'
opened)
30" @ 110'
20" @ 982'
........
~
S~b..CJ D
P - 'I
AGi... !;o.
U~HCJ OIL Ca'pJ1jN OF Cf\LIFCRiJIA
\ Æ~LL ¡ ~ECC~ITJ
- \',Ell. r:o.
1
FIELD EIGHT MILE LAKE PROSPECT
~> .
-. --- - ---
Directional1y drilled l2!z;" hole f/3405' to 3576'. Poon. RIH w/
Bit #32 on BRA #25 for Dyna-Dri11 Run #6. Oriented Dyna-Drill
with SDC steering tool 1200 left o{ high side. Dyna-Drilled l2!z;"
hole f/3576' to 3628'. Trip for Bit #33.
Oriented D.D. 1200 left of high side for Dyna-Dril1 Run #7. Dyna-
Drilled f/3628' to 3698'. Trip for Bit #34. Oriented 1200 left
of high side for Dyna-Dri1l Run #8. Dyna-Drilled f/3698' to 3774',
Pooh. RIH w/Bit 1135' on BRA #26 (34' pendulum dropping assembly).
Reamed tool run f/3576' to 3774'. Directionally drilled 12!z;"
hole f/3774' to 3937'. Pooh. RIH w/Bit #36 on BRA #27 for Dyna-
Drill Run #9. Oriented Dyna-Dri111200 left of high side. Dyna-
drilled l2~' hole f/3937' to 4007'. Circ. & condo mud.
Pooh and lay down dyna-drill. Rigged down S.D.C. P.U. and RIH
w/Bit #37 on BRA #28. Reamed dyna-drill run f/?937' to 4007'.
Drilled l2!z;" hole f/4007' to 4011'. Circ. and made 15 std. wip-er
trip - had no tight spots or fill. Circ. and condo mud. Pooh.
Rigged up Schlumberger and ran DIL-SONIC-GR, FDC-CNL, and HDT logs
f/4005' to 982'. Ran sidewall c~re gun.
Ran and shot 45 sidewall cores. Rec. 22 cores. Rigged down
Sch1umberger. RIH w/17~" H.O. on BRA 1129 and opened l2!z;" hole to
l7~" f/982' to 1610'. Hit bridge w/bu1lnose on hole opener -
could not work thru. Pooh. RIH w/12!z;" bit and .r~amed bridges
f/16l0' to 2060'. Circ. bottoms up and Pooh. RIH w/H.O. #2 on
BRA #30 and opened l2!z;" hole to 17~" f/16l0' to 2000'.
Opened l2!z;" hole to 17~" f/2000' to 2075'. Pooh. RIH w/R.D. #3
on BHA 1130 and opened l2!z;" hole to l7~" f/2075' to 2442'. Pooh.
RIH w/H.O. 114 on BHj\. 1131 and opened l2!z;" hole to 17~" f/2442' to
2816' .
(316'
Opened l2!z;" hole to l7~" f/28l6' to 2878'. Pooh. RIH w/H.D. #5
on BHA #32 and opened hole f/2878' to 3292'. Pooh. RIH w/H.D.
#6 on BRA #33. Reamed tight ~pots f/2790' to 2837' and 3227' to
3292'. Opened l2!z;" hole f/3292' to 3298'.
:
l£¡~SE
D.\TE
28
29
30
31
32
33
TRAIL RIDGE UNIT
, -,
I Em I
---+---.---- -t
6/27/80
4011' TD
17~" hole f/
3298' to 3589'
(291' openec)
30" @ 110'
20" @ 982'
6/28/80
4011' TD
17~" hole f/
3589' to 3756'
(167' opened)
30" @ 110'
20" @ 982'
'""""
, f
~
SHE.-LJ D
P - a,
AGt: !;o,
U~HC;J OIL Ca.pfJf( OF U\LIFCRrHA
\ jELL ¡ :ECCRlJ
\',EU., no, 1
- FlEW EIGHT MILE LAKE PROSPECT
DETAILS GF OPF..P.J\TIONS, DESCRIPTlCiIS & RESULTS
------ ----~ --
.~-
Opened l2~" hole to l7~" from 3298' to 3589'. Pooh. Found washout
in 18th joint of HWDP above jars. RIH w/H.O. #7 on BRA #34. Had
tight spot @ 2979'. Reamed f/3500' to 3589'. Found bridge @
3589'. C & C mud. Pooh.
RIH w/R.R. l2~" bit #37 on BRA 1135 for clean out. Cleaned out
bridge f/3579' to 3610'. RIH to 4011' and circ. clean. Pooh. RIH
w/H.O. 117 on BRA 1136 and opened l2~" hole to l7~" f/3589' to 3756'.
6/29/80
4011' TD
l7~" hole f/
3756' to 3980~224'
30" @ 110'
20" @ 982'
Continued to open hole f/3756' to 3826'. Pooh. RIH w/H.O. #8 on
BRA #36 and opened l2~" hole to l7~" f/3826' to 3980'. Pooh. RIH
w/H.O. 119 on BRA #36.
opened)
6/30/80
4011' TD
30" @ 110'
20" @ 982'
40ll'TD
3963' EfD (FC)
30" D. LlO'
20" C. ~82'
7/V80
7/2/80
4011' TJ
3963' EfD(FC)
20" C. ~82'
13 3/8",:.4008'
Opened 12~" hole to l7~" f/3980' to 40111. 'Circ. clean.
Strapped out of hole to 20" shoe. Waited 1 hr. RIH and
found 26' fill. c.o. to 4011'. Circ. and condo mud. Pooh.
RIH w/1ocked-up BRA 1137 and found 25' fill. c.o. to 4011'.
(Have 5-8' of fill while working pipe 30'). Reduced pump rate
and worked pipe 5'. Made 15 stand wiper trip.' Found 3' fill.
Circ. and condo mud.
Circ. & Condo m~d while working pipe 5'. Made 25 std. wiper
trip. No fill after trip. Circ. clean. Pooh. Rig up and ran
103 j ts. 13 3/8" combination 6111 and 68 II K-55 buttress casing.
Landed casing w/float shoe @ 4008'. Stab in float collar @
3963' ,6811 f/shoe to 2961',61# f/296l' to surface. (Note:
Had to rig up circ. head and circ. 13 3/8" csg. past bridge
@ 3966' while running csg.). Circ. cap of csg. (9 BPM @ 500
psi w/same press taking returns up annulus or out 2-4" lines
on 20" csg. head). Removed 20" Hydril. (Note: 20" csg. head.
damaged by Kelly - shouldn't {'resent problem as 13 3/8" will
be cmt'd to surface).
Set Gray Tool Co. csg. hanger in 20" head w/275 Mil. Reinstalle,
20" Hydril and flowline. Cut off 13 3/8" landing jt. below
rotary table. Strapped in hole w/B&W stab-in sub. Stabbed
into F.C. @ 3963'. Circ. and condo mud for cementing. Rigged
up HOWCO and tested lines to 3000 psi. Pumped 50 bbls. of
water ahead of 1600 sx. cl. "G" w/2 1/2% pt;e-hydrated gel
(12.6 ppg). Had cement returns to surface. Followed with 250
sx. cl "G" w/2% CaC12 (15.8 ppg). Displace drill pipe w/46
bbls. mud (10 bbls. short of total displacement). CIP @
10:15 hrs. 7/2/80. Checked floats - held OK. Pooh w/stab-in
sub. Removed 20" hydril and flowline. Installed Gray Tool Co.
csg. spool and tested to 1500 psi - OK. (Note: filled in
around pack-off w/plastic). Installed 13 5/8" 5M BOP' stack.
w\SE
TRAIL RIDGE UNIT
--
J)~TE ETD
.- --- - -
34 7/3/80
35
7/1./80
36
7/5/80
37
7/6/80
38
7/7/80
39
7/8/80
40
7/':/80
41
7/--0/80
42
7/--1/80
43
7/--2/80
'-'"'
""""¡
S~~CJ D
P -"
AGt.. !;o.
U~'IICI OIL Ca'pfJN OF O\LIFCRiJIA
\ jELL ¡ ~ECC~lJ
,
I
. .. I
\',[LL r:o.
1
FIELDEIGHT MILE LAKE PROSPECT
-,-
DETAILS OF OPEPj\TICNS, DESCRI?TlCì!S & RESULTS
- ~._-
.- ..... ..
-- - ~ -- - -- ----
._-~- - ----
4011' TD Completed nippling up 13 5/8" 5000 psi BOP stack. Tested BOPE
20" C. 982' to state spec's (Upper Kelly cock wouldn't test - -replaced
13 3/8" C. 4008' same). BOP test W.A.A. by state D.O.G. Rep. RIH w/bit
33RR on BRA #38. Tagged cmt. @ 3582'. C.O. cmt. stringers
£/3582' t03932' and C.O. hard cmt. f/3932' to F.C. @ 3963'.
Tested 13 3/8" csg. to 2500 psi - OK.
4205'/ 194'
20" C.':82'
l33/8"C.4008'
Drilled out F.C. and cmt. to shoe @ 4008'. Retested 13 3/8"
csg. to 2500 psi - OK. Drilled out shoe and made new hole to
4025'. Pulled into csg. and performed leak-off test of the
13 3/8" shoe. Formation would stabilize and hold 600 psi @
surface w/68 PCF mud in hole I.E. 91.5 PCF equiv. Pooh. Ran
SDC Gyro Survey f/surface to 3975'. RIH w/bit #40 on BRA #39.
Directionally drilled l2~' hole f/4025 to 4205'.
~484'/ 279' Directionally drilled £/4205' to 4332'. Pooh. RIH w/bit #41
20"C.9&2' on BRA #39. Reamed to BTM £/4242' to 4332'. Directionally
13 3/8"C.4008' drilled l2~" hole £/4332' to 4484'.
4544' /6.0'
20"C.982'
l33/8'C.4008'
4675'/131'
20"C.9E2'
l33/8'C.4008'
Pooh. RIH w/BRA #40 and bit #42 for Dyna-Drill run #10.
Oriented Dyna-Drill 900 left of H.S. w/SDC steering tool.
Dyna-drilled l2~" hole f/4484' to 4514'. Bit locked up. Pooh.
RIH w/BHA #40 and Bit #43 for Dyna~Drill- ru~ #11. Oriented
Dyna-DrillllOo left of H.S. w/SDC steering tool. Dyna-
drilled l2~" hole f/45l4' to 4544'.
Dyna-drilled l2~" hole f/4544' to 4562'. Rigged down SDC and
Pooh. Layed down dyna-drill. RIH w/bit #44 on BRA #41.
Reamed £/4484' to 4562'. Directionally drilled l2~" hole f/
4562' to 4672'. Pooh. RIH w/bit #45 on BRA #42 and reamed
f/46l2' to 4672'. Directionally drilled l2~" hole f/4672'
to 4675'.
5225'/5.50' Directionally drld. l2~" hole f/4675' to 5117'. Made 10 stand
20"C.9E2' wiper trip. Had no drag and no fill. Directionally drld.
13 3/8" C. 4008' l2~" hole f /5117' to 5225'.
5363'/138' Directionally drilled l2~' hole f/5225' to 5305'. Pooh. RIH
20"C.9E2' w/Dyna-drill #12 on bit #46 and BRA 1143. Orient tool face
13 3/8"C.4008' 750 left oJ; high side. Dyna-drilled l2~" hole f/5305' to 5363'
Pooh. RIH w/bit #47 on BRA #44.
5683'/:"'20' RIH w/bit #47 on BRA #44. Directionally drilled l2~" hole
20"C.9E2' f/5363' to 5470'. Pooh.. Tested BOP stack. RIH w/bit #48 on
13 3/8" C. 4008' BHA #45 (locked up assembly). Directionally drilled l2~" hole
f/5470' to 5683'.
I
5826'/143
20"C.9E2'
l33/8"C.4008'
5851'/25'
20"C.9E2'
l33/8"C.4008'
Directionally drilled l2~' hole f/5683' to 5805'. Pooh. RIH
w/bit #49 on BRA #46. Plugged bit - could not unplug. Pooh.
Cleared bit and RIH. Directionally drilled l2~" hole f/5805'
to 5826'. Pump pressure dropped f/2500 psi @ 50 SPM to 1850
psi @ 58 SPM. Pooh looking for washout.
(Completed Pooh looking for washout). -Did not find W.O.
Staged DC's and HWDP back in hole. Had 2000 psi pressure at
top of HWDP. Staged back in hole. Circ. pressure w/34 stds.
in hole was 1700 psi. Staged back out to top of HWDP. Pressur
now was 1300 psi. Pooh. RIH w/blanked-off bit to top o£ HWDP.
Pressure tested to 5000 psi - OK. Pooh. RIH w/bit #50 on
BRA #46. Circ. @ top of HWDP w/2l00 psi @ 55 SPM. (normal
pressure). RIH. C.O. 10' bridge @ 5534'. Directionally
drilled l2~" hole £/5826' to 5851'.
L£;~SE
---
DATE
---
44
45
46
47
48
49
50
51
52
.
........
~
s~~r:r D
P .... a,
AGt.. ! IJ .
U~'I Ic;! 0 ILea .Pfl N OF U\LI FCRi J I^
\iELL ¡:ECC~
TRAIL RIDGE UNIT
,
¡ .
7/_3/80
7/~4/80
7 (:"5/80
7/:'6/80
7/17/80
7/18/80
7/lj/80
7/23/80
7/'-1/80
Em
I -
I
-. . I .--
- \'IELl. r:o.
1
FIELDEIGHT MILE LAKE PROSPECT
DETAILS OF OPER<'\TIONS: DESCRI?TICiIS & RESULTS
- .~----- - . -_. .-- -~
. -=- ~-,
6045'/~94' Pooh. RIH w/bit #51 on BRA #46 (locked-up assembly) and
20"C. 982' drilled f/585l' to 5994'. Pooh. RIH w/bit #52 on BRA 1147 (20
13 3/8"C.4008' pendulum assembly) and drilled l2~" hole f/5994' to 6045'.
6341'/296'
20"C.982'
l33/8nC.4008'
6732'/391'
20"C.9&2'
l33/8'C.4008'
Directionally drilled l2~' hole f/6045' to 6175'. Pooh. RIH
w/bit #53 on BRA #48 (30' pendulum assembly). Washed 230' to
bottom. Directionally drilled l2~" hole f/6l75' to 6341'.
Pump pressure dropped from 2100 psi to 1300 psi @ 58 SPM.
Pooh. Found 1 jet gone from extended nozzle. RIH w/bit #54 or
BRA #49. (10' pendulum assembly).
RIH w/bit #54 on BRA #49 (10' pendulum assembly). Direction-
ally drilled l2~" hole f/6341' to 6532'. Pooh. RIH w/bit #55
on BRA #50 (30' pendulum assembly) and washed 240' to bottom.
Directionally drilled l2~" hole f/6532, to 6732'. Pump
pressure dropped from 2200 psi to 450 psi @ 59 SPM. Pooh.
Lost 2 extended nozzles on bit #55. RIH w/bit #56 on BRA #51.
6907'/175' RIH w/bit #56 on BRA #51 (l~ hrs. down time to pull clutch in
20"C.9~2' pump). Washed down from 6307' to 6732'. Drilled on junk (2
13 3/8"C. 4008' extended nozzles) for 1/2 hr. Directionally drilled l2~" hole
f/6732' to 6907'. Dropped survey.
7072'/155'
20" C.932'
13 3/8"::;.4008'
7215'/143'
20" C.9ò2'
13 3/ 8'\~. 4008 '
Pooh w/bit #56 and BRA #51. RIH w/bit #57 opßRA #52 (30'
pendulum assembly). Down 1 hour to repair clutch on pump
drive. Directionally drilled l2~" hole f/6907' to 6982'. Ran
W.L. survey - wireline broke while retrieving survey. Pooh.
Rec. survey instrument. RIH w/bit #57RR on BRA #52. Washed
and reamed f/6909' to 6982'. Directionally drilled l2~" hole
f/6982' to 7072'. Pooh. .
RIH w/bit #58 on BRA #53 for Dyna-Drill Run #13. Washed to btm
f/7042' to 7072'. Oriented Dyna-drilllOOo left of H.S. w/SDC
steering tool. Dyna-drilled f/7072' to 7137'. Pooh. RIH w/
bit #57RR #2 on BRA #54 (a 30' pendulum). Reamed f/7072' to
7137'. Dir. drilled f/7l37' to 7215'. Surveyed & Pooh.
7562'/3~7' RIH w/BHA #55 & bit #57RR #3. Reamed f/69l5' to 7215'. (BRA
20"C. 982' 1155 packed assy. w/lO' lead collar). Directionally drilled
13 3/8" C.4008'f/72l5' to 7562'. Lost 700 psi on pumps. Pooh. Jet was
washed out in bit.
8073'/5"...1'
20"C.982'
l33/8"C.4008'
8073'/C'
20"C.982'
l33/8"C.4008'
RIH w/bit #59 on BRA #55. Reamed to btm. f/7532' to 7562'.
Directionally drilled "f/7562' to 8073'. Stuck drill pipe @
8073', driller was attempting to hold 65M# on bit as p~r
directional eng. request and drilled into coal break @ 8070'
& was stuck by 8073',3' into coal break. Worked pipe and
jars and attempted to free pipe. After 4 hrs. of working
pipe at a reduced circ. rate, a washout developed or a nozzie
was damaged causing loss of 900 psi of pump pressure.
Mixed black magic - SFT pill. Pumped 21 bbls. water & 7 bbls.
diesel ahead of 41.5 bbls. of pill. Displaced w/l bbl. diesel,
3 bbls. water and 110 bbls. mud leaving 18 bbls. of pill
around collars and 24 bbls. in drill pipe. Worked DIP. from
100M# to 375M# while displacing 1 bbl. of pill every 2 hours.
lIASE
TRAIL RIDGE UNIT
-
n\TE ' ETD
- .- --".
... .~
53 7/22/S0
54
55
56
57
58
59
7/'23/80
7/:4/80
7/25/S0
7/26/S0
7/27/80
7/2S/S0
..............
"--""
S~E-r:r D
P -'t
AGt.. !;o.
U~'lICJ OIL ca'pßjrf OF CALIFCRrJIA
\ ¡ELL ¡ :ECCRlJ
-- -
~
\\ELL r 10 ,
1
...
.
FIEWEIGHT MILE LAKE PROSPECT }-,
, "'0
DETA!LS OF OPEP,,'\TIONS DESCRIPT!CiIS & RESULTS
r -
---
_._~-_...- '--"--',.~
- . I. - '---.;1-. -.;:-.. - ---"--" .
S073' / ) ,
20" C. 982'
l33/S'C.4008'
8073' ':'D
7977' :OF
20" C. 982'
l33/S'C.4008'
S073' ':"'D
7325' PBTD
20"C.982'
l33/8'C.4008'
7450' /6)'
KOP 739)'
20" C. 982'
l33/SnC.400S'
7543'/93'
KOP 739)'
20" C. 982'
l33/S"C.400S'
.....--'-
Jarred on stuck D.P. f/lOOM# to 375M#. Would not come free.
Slacked all weight off and manually backed off drill pipe @
+2050'. (Had 40,000# P.u. weight). Set Kelly back and
removed Kelly screen. Screwed back into fish. Checked torque
and weight. Rigged up Dialog on S.D.C. W.L. and RIH w/CCL,
free point indicator, and 500 gr. shot. Found free point in
top monel D.C. Stabilizer below monel D.C. was 100% stuck
@ 7973'. Worked 5 rounds of left torque into pipe and fired
charge - had no indication of movement. Pooh. RIH w/700 gr.
charge. Worked 7 rounds of left torque into pipe and fired
charge - had no indication of movement. Pooh. Worked pipe
to the left and pipe backed off. Had a pick-up weight of
225M#. R.D. Dialog and S.D.C. Pooh w/D.P. Pipe pulled tight
for 8 stds.
Pooh after back-off. Rec. 1 monel D.C. and 2 stabs. Top of
fish @ 7977'. (Left bit, 6 pt. stab, 10' lead collar, 6 pt.
roller reamer, 30' monel D.C., stab, 30' mo~el D.C. in hol~-
95.17') RIH w/bit #49RR on BRA #56. Reamed tight hole f/7444
to 7977'. Circ. and condo mud @ 7977'. Pooh M.U. 610' of
3~" butt. tbg. stinger on 5" D.P. and RIH.
RIH w/6l0' of 3~" tbg. stinger on 5" D.P. Hung @ 7975'.
Circ. and condo mud. Lead w/lO bbls. water followed by 500
sx. cl. "G" w/l% CFR-2 and 10% sand. Disp. w/124 bbls. mud.
CIP @ 05:15a.m. (Theoretical top of cmt. @ 7325'). Pooh and
lay down 3~" tbg. RIH w/bit #5SRR on BHA 1156.to shoe of
13 3/8" csg. Circ. and WOC 18 hours. RIll w/BRA #56 @ 23:15
hrs.
Finish R~H w/bit #58RR on BRA #56. c.o. cement stringers @
@ 7245'. Tag firm cmt. @ 7369'. c.o. cmt. f/1369' to 7390'.
Circ. and Pooh. RIH w/bit #60 on BRA #57 for Dyna-Drill Run
#14. Oriented D/D 750 ¡eft of high side. Dyna-Drilled l2~'
hole f/7390' to 7450'. S.D.C. showed 4~" left turn and no
drift angle change.
Rigged down S.D.C. and Pooh. Tested BOPE - OK. RIH w/bit
#61 on BRA #58 (follow-up assembly) and directionally drilled
l2~" hole f/7450' to 7511'. (1st survey below D/D run showed
130 of left hand turn). Pooh. RIH w/bit #62 on BRA 1159
(locked-up assembly). Directionally drilled 12~" hole f/75ll'
to 7543'.
822l'/67S' Drilled l2~" hole f/7543" to S22l' (Had drilling break f/807l'
to S080'. Bottoms up showed some coal and wood fragments).
20"C. 9:82' Pooh. M.U. bit #63 on BRA #60 (Angle-building assembly).
l33/S"C.4008'
8579'/358' RIH w/bit #63 on BRA #60 and directionally drilled l2~" hole
7977' T.O.F. f/822l' to 8579'. Pooh. Hole was tight 1st five stands.
20"C. 982' RIH w/bit 1¡64:~ on BRA #61.
13 3/8":;.4008'
..........
......"
S~b-r:-r D
P ..."
AGt.. !;o.
U;'l I C;! 0 ILea 'PfJ N OF U\LI Fcrn J IA
\ jELL ¡ ~ECORD
If¡\SE
TRAIL RIDGE UNIT
----,
DATE t Em
-- - ----,-
60
7/29/80
61
7/30/80
62
7/31/80
63
.8/ _/80
64
8/2/80
65
8/3/80
,
I
,-1
8700'/121'
20" C.982'
l33/8"C.4008'
8755'/55'
20"C.932'
l33/8'C.4008'
\.r:LL ~'O 1
IL- II 4
FIELD EIGHT MILE LAKE PROSPECT
---
DETAILS OF OPEPj\TIONS, DESCRI?TICì!S & RESULTS
----- -
. ----. ..---
---"
---"-- - -
RIH w/bit #64 on BRA #61. Stuck bit @ 8544' (35' off bottom)
while reaming~ to bottom on trip. Had washout while working to
free pipe (pressure dropped f/2000 psi @ 45 spm to 1800 psi @
60 spm). Worked torque down to jars and jarred on d.p. Pipe
pulled free. - Pooh looking for washout. Pipe pulled tight 1st
14 jts. Found washout in 16th joint from surface (slip area
of "G" pipe). Completed Pooh. RIH w/bit 1164 on BRA 1161 and
reamed f/8485' to 8579'. Directionally drilled l2~" hole
f/8579' to 8698'. Pooh. RIH w/bit 1165 on BRA #62 for Dyna-
Drill Run #15. RU SDC. Oriented tool 800 right of high side.
Could not get D/D to operate. D/D began to operate after 2
hours. Re-oriented D/D and directionally drilled 12~" hole
f/8698' to 8700'. D/D stopped drilling again.
Pooh w/Dyna-DrillIl15. Changed D/D. RIH w/bit 1165RR on BRA
#62 for Dyna-Drill Run #16. RIH w/SDC - could not seat tool.
Circ. to clear assembly. Seated tool and oriented D/D 860"rt.
of high side. Directiona11y drilled 12~" hole f/8700' to
8755'. R.D. SDC and Pooh. Layed down Dyna-Drill. RIH w/bit
#63RR on BRA #63 (locked assembly).
9550'/795' RIH w/bit #63RR on BRA 1163. Reamed hole f/8665' to 8755'.
20"C.982' Directionally drilled l2~" hole f/8755' to 9550'.
13 3/8" C.4008' .. -
10,058'/508' Directionally drld. l2~" hole f/9550' to 9561'. Made 24 stand
20" C. 982' wiper trip. Pulled tight 1st 8 stands. RIH - OK. Direction-
13 3/8"C.4008' ally drld. l2~" hole f/956l' to 10,058'. Pooh - tight 1st 5
stands.
10,687'/629' Finish Pooh. RIH w/bit #66 on BRA 1164 (angle-building
20" C. 982' assembly). Directionally drld. l2~" hole f/10,058' to 10,687'
l33/8"'C.4008'
10,754'/67'
20"C.9U2'
l33/8"C.4008'
Directionally drld l2~" hole f/lO,687' to 10,754'. Pooh.
Drill pipe parted at the surface with 2 stands out of the hole
(Pipe parted at base of 180 taper below the tool joint). RIH
w/overshot and grapple and tagged top of fish @ 251'. Latched
onto fish, checked weight, and broke circ. - had 1 jet plugged
Circ. @ 24 SPM w/2400 psi. Circ. and jarred on stuck D.P.
w/375MII. Set kelly back "and TIH w/W.L. to retrieve survey
instrument - could not rec. P.U. kelly and cont. to circ.
and jar on pipe. Mixed 60 bbls. of b~ck magic - SFT pill.
Pumped 21 bbls H2O, 7 bbls. diesel, 60 bbls. SFT pill, 2 bbls.
diesel, 5 bbls. H2O, and 150 bbls. mud. (Have 40 bbl. pill
outside pipe and 20 bbls. inside). Pill in place @ 10:00 PM.
Pumped 1 bbl. per hour and worked jars for 10 min. every 1/2
hour.
L£;\SE
D,\TE
66
67
6B
69
70
71
72
........,.
TRAIL RIDGE UNIT
B/4/BO
B/5/BO
B/E/BO
8/7/BO
B/B/BO
B/9/BO
B/l)/BO
Em
---
10, 754' fO'
20" C. ~B2'
l33/B"\;.400B'
10 754' fO'
, .
T.O.F. :"0,565'
20"C.9B2'
l33/B"G.400B'
10,754'/0'
10,565' T.O.F.
20"C.982'
l33/B"C.400B'
10,754'10'
10,565' T.O.F.
20"C.9B2'
13 3/8":;.4008'
10,565' TOF
10,225' KOP
20"C.98l'
l33/8"C.4008'
10,565' TOF
10,225' KOP
20"C.982'
13 3/8"~.400B'
10,296' f7l'
10,565' TOF
10,225' KOP
20"C.982'
13 3/8"(;.4008'
'-" .
S~E-r:-r D
P ..."
AGL !;o,
-
U~'l Ic;! 0 ILea 'PfJ rf OF CALI FCPJ J IA
\ Æ1L ¡ ~ECC~ITJ
\.r:LL r:o.
1
FIELDEIGHT MILE LAKE PROSPECT
DET;\ !LS OF OPEPi\TIONS4 DESCRIPTICilS & RESULTS
.--
~
Continued jarring on D.P. Working pipe f/lOOM# to-375M# while
moving SFT pill 1 bbl. every hour. Rigged up S.D.C. and
Dialog. RIH w/free-point indicator, CCL, and 600 gr. shot.
Tools stopped @ 10,357' (33rd jt. of HWDP). Pooh. RIH wi
1 5/8" bar - could not work past 10,357'. Pooh. RIH w/
l~" CCL and 500 gr. chårge. Worked thru bad spot @ 10,357':
Checked collars and torqued pipe for backoff.
Worked left-hand torque into drill pipe. Backed-off drill pipe
@ 10,565' (In x-over above D.C.'s). Left lB8.Bl' of fish in
hole. Pooh w/W.L. Pulled 7 jts. and layed down overshot and
fish. P.U. Kelly and circ. bottoms up - returns were clean.
Pooh layed down drill pipe. Repaired rotary table. P.U. l2!z;"
bit #64RR on BRA #65 (clean-out assembly). M.U. and RIH w/new
drill pipe.
RIH w/bit 1164RR on BRA #65. P.U. and break-in new "E" drill
pipe. Had accident on rig floor (Floorhand hit by rig tongs).
Rig down 6 hours due to accident. Resumed rig operations at
11:30 a.m. Continued to pick up and break-in new drill pipe.
Have a total of 130 jts. of "E", 130 jts. of "X-95", and 5 jts.
of "S-135" drill pipe.
.. ..
Continue to pick up S-135 drill pipe. Reamed down f/9700' to
10,565'. Circ. at 10,565'. Pressure dropped f/2300 psi @ 47
SPM to 2050 psi @ 55 SPM. Pooh looking for washout. Had
tight hole. Had to work thru spots at 10,544' ,and 10,472'.
Found washout in slip area of lath joint of S-~35 drill pipe
(+ 530' down). RIH and circ. hole clean @ 10,565'. Pooh. M.U
and RIH w/6l0' of 3" tubing stinger on 5" drill pipe.
Completed picking up and RIH w/tubing stinger, plug catcher,
and drill pipe. Hung at 10,562' (3' above fish). Pumped 20
bbls. water, 300 sx. cl. "G" cmt. w/l% CFR-2, .1% HR-7, and
10% sand. Dropped wiper plug and displaced cmt. w/2.5 bbls.
water and lB2 bbls. mud. Did not bump plug. CIP @ 07:15 hrs.
8/B/80. Pulled 6 stands and pumped 20 bbls. - did not bump
plug. Pooh. Did not find plug in plug catcher. Test BOPE -
OK. RIH w/bit 116lRR on BRA #66 (clean-out assembly). WOC.
RIH w/D.P. Found plug in 57th stand of D.P. Tagged top of plu~
@ 10,214'. polished firm plug to 10,225'. Circ. clean and
Pooh. Changed out old S-135 D.P. with new S-135 D.P. RIH w/
bit #67 on BRA #67 for Dyna-Drill Run 1117. Oriented tool face
1500 left of high side.
Dyna-drilled l2!z;" hole f /10,225' to 10,255 '., Dyna-DrilJ began
to act sticky. Pooh. RIH w/bit #68 on BHÁ #68 (30'
pendulum assembly) and directionally drilled l2!z;" hole f/lO,255
to 10,296'. Circ. and survey.
'-"'
\-.....1
S~~CJ D
P -"
AG~ ¡;o,
U~'IIC:! OIL Ca'ppJN OF O\LIFCRiJIA
\iELL ¡ :ECŒill
w\SE
TRAIL RIDGE UNIT
.-- ,
DATE ,
-- ---~....
73
8/:"1/80
74
8/:"2/80
75
8/13/80
76
8/14/80
ETD
,
.1-
--
10,553'/257'
10,565' T.O.F.
10,225' KOP
20"C.9E2'
133/8'C.4008'
10,553'-;0'
10,5651 TOF
10,225' KOP
20"C.982'
13 3/8' 'C. 4008'
10,553'/0'
10,565' T.O.F.
10,225' {OP
20"C.982'
13 3/8"~.4008'
10,830'/277'
10,565' TOF
10,225' KOP
20"C.98Q'
13 3/8":.4008'
\\tli. r:o. 1
FIELD EIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.i\TIONS, DESCRIPTIOilS & RESULTS
-.---------
Ran survey @ 10,265'. Pooh. RIH on bit #69 on BRA #69 (ang1e-
building assembly) and reamed f/10,200' to 10,296'. Direction-
ally drilled l2~" hole f/10,296' to 10,553'. Hole showed high
torque f/10,520' to 10,533'. Had 400M# pick up weight to make
a connection. Pooh for short trip - had excessive drag for
400'. Put on Kelly to work thru tight spot at + 10,150'.
Completed Pooh. (Had 375 to 400M# off btm. reducing to 325
to 335M# after pulling 6 2/3 stds., balance of trip out OK).
Cleaned hard packed clay from stabilizers. RIH w/BRA #69 &
bit #69. Reamed f/10210' to 10302' working each single the
fu111ength of Kelly after each one was reamed down. Torque
running between 330 & 390 & hole very tight. Had 400M# pick
up wt. after reaming to 10302'. Pulled out of tight area
coming out @ 10225' (top of D.D. run). Pulled out to 9930'.
Hole condo good f/10225' to 9930'. Run back in & reamed f/
10180' to 10210' and torque indicator broke~ Pulled up to-
9930' & repairèd torque indicator. (Down 4 hrs. for repair).
RIH to 10107' & started reaming. Reamed f/10107' to 10393'
& broke torque indicator again. Pulled up to 9930'. Had
365M# max. hook load coming up.
Pooh w/8 stds. of d.p. Repaired rotary torque cylinder and
gauge (Down 4~ hrs. for repair). RIH. Reamed f/10,433' to
10,489'. While reaming @ 10,489' drill pipèparted at 1226'
in new X-95 drill pipe (pin failure). Pipe fell 64' to bottom.
Pooh w/d.p. RIH w/10 3/4" O.S. w/6 3/8" grapple and pack-off.
Strapped into hole and latched onto fish @ 1308'. Checked
weight and tried to break circ. - packoff failed. Picked up
to 200M# to pull slack out of pipe - top of fish now @ 1294',
bit at 10,553' T.D. Worked torque into d.p. and found travel
in both sets of jars. Jarred on pipe. Pipe pulled free @
425M#. Pulled out and 1ayed down O.S. and bad joint. P.U.
Kelly and circ. 1/2 hrs. Pooh. Layed down 8 jts. of bent
"E" d.p. Found 2nd joint of HWDP almost unscrewed. Ran
back in hole w/bit #70 on BRA #69 to top of HWDP. Pooh
laying down 38 jts. of HWDP.
P.U. and broke in 40 jts. of HWDP on BRA #70. Laid down 6
more joints of "E" d.p.(a total of 14 joints laid down) and
1 "X-95" joint. RIH to 6?00' and circ. RIH and reamed f/10,4l5
to 10,553'. Directional1y drilled l2~" hole f/10,553' to
10,830'. Stuck drill pipe while rotating to bottom after
connection. Worked pipe f/350M# to 430M#. Worked torque out
of drill pipe and jarred on pipe (Jars hitting @ 375M#).
Working jars 10 min. and down 30 min.
L£¡\SE
Il~ TE
77
78
79
80
81
82
83
~
\...I
SHS-t:1 D
P .... 11
J\Gt: !;o.
UNIC;J OIL Ca'PNN OF O\lIFCRrJIA
\iELl ¡~ECORD
TRAIL RIDGE UNIT
8/:'5/80
8/:'6/80
8/:'7/80
8/--8/80
8/:9/80
8/2')/80
8/-¿1/80
ETD
10,830'/0'
20"C.9f2'
l33/8'C.4008'
\Jll. r 10 .
1
FIEIJ) EIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.l\TIONS, DESCRIPTIOnS & RESULTS
Jarred on d.p. mix 60 bb1s. of black magic - SFT pill. Spot
30 bbls. outside pipe and 30 bb1s. inside pipe. Move 1 bbl.
of SFT every hour. Working d.p. up to 425M#. Have travel in
both sets of jars. Only top set of jars hitting.
10,830'/0' Continue jarring on stuck pipe for 10 min. every ~ hr.
20"C. S 82' 1 bbl. SFT every 2 hours. Work pipe up to 450MI!.
l33/8'C.4008'
10,830'/0'
20"C. S 82 '
13 3/8"C. 4008'
10,830'/0'
10,678' T.O.F.
20"C.9f'2'
13 3/8"C.4008'
10,830'/0'
10,678' T.O.F.
20"C.9E2'
l33/8"C.4008'
10,830'/0'
10,678' TOF
20"C.98l'
l33/8"C.4008'
10,830'/0'
10,678' T.O.F.
20" C.582'
13 3/8'IC.4008'
Move
Move 1 bbl. SFT every 3 hours - pill spotted for 48 hrs. Rig-
ged up SDC and dialog. TIH w/CCL, free point indicator, and
1200 gr. shot. Found stretch down to 10,785' and torque down
to 10,683'. Worked 9 rounds of left-hand torque into d.p. and
shot charge at 10,720' - no back-off. Pooh w/W.L. TIH w/CCL
and 900 gr. shot. Worked 9 rounds of left hand torque into d.p
and shot @ 10,607'. Pipe backed off. Had P.U. wt. of 380M#.
Pooh w/W.L. Pooh w/d.p.
Pooh w/d.p. and 1ayed down fish. Rec. HWDP, 6~" jars, keyseat
wiper, x-over, stab., 1 steel D.C., portion of 7 3/4" jars.
(Unscrewed from btm. sub in 7 3/4" jars). Total length of fist
is 152'. Top of fish @ 10,678'. RIH w/IO 5/8" O.S. and 7 3/4'1
grapple, 7 3/4" B.S., 7 3/4" oil jars, 4 - 8" D.C.'s, 7 3/4"
accelerator, and 39 jts. HWDP to 4000'. Pooh to change exten-
sion on O.S. RIH to 10,678'. P.U. Kelly añd-worked over top
of fish. Had pump pressure increase, then decrease. Packoff
in O.S. would not hold. P.U. to 450M# and O.S. pulled free.
Worked over fish 4 times - would not hold. Pulled up above
fish and circ. and condo mud.
Finished Pooh w/D.P. Redressed O.S. w/7 3/4" grapple & mill
control. RIH to 10,670'. Broke circ. to clear O.S. Worked
over fish @ 10;678'. Checked P.U. wt. & set grapple. Jarred
on fish 5 hours - did not move. R.U. Dialog on SDC line. RIH
w/1200 gr. shot, FPI, and CCL. Tools stopped at 10,678'.
Could not get into top of fish. Pooh w/W.L. P.U. Kelly & put
2000 psi on D.P. Worked 7 rounds of left-hand torque into
pipe - l§> st torque & pressure. P. U. to check wt. - had 300M!!
(Indicates back off in HWDP). Set down & screwed into con-
nection. Torqued up pipe 3 times & grapple released. Had
P.U. wt. of 350M#. Pooh w/D.P. Found loose connection
between HWDP & x-over above collars. Layed down fishing
tools. Made up BHA #72. .
RIH w/bit #71 on BRA #72 (clean out assembly) to top of fish
@ 10,678'. Circ. and condo mud (add 1 PPB fresh gel). Pooh
hole in good shape. Rigged up Sch1umberger. RIH w/DIL-SONIC
log to 10,625' (logged while RIH). Pooh - running DIL-SONIC
log.
Completed running DIL-SONIC log. Ran F~C-CNL f/lO,625' to
4008'. Ran Dipmeter - tool failed. Ran back-up Dipmeter -
tool failed. Wait on 3rd Dipmeter tool to arrive. Ran
Dipmeter f/lO,625' to 4008'. Rigged up for velocity survey.
RIH to 10,625'.
l£¡~SE TRAIL RIDGE UNIT
-_.
1),\ TE ' ETD
.- I ----
84
85
86
87
88
89
90
8/22/80
8/23/80
8/24/80
8/25/80
8/26/80
8/'£.7/80
8/'1.8/80
,-"....
"'-/
SELrJ D
P .-.,
AGt.. !;o.
U~'IIc;J OIL Ca"PPJN OF U\lIFCRrJIA
\ jELL ¡ :ECO~
- \'r:LL r:o.
1
FIELDEIGHT MILE LAKE PROSPECT
DETAILS OF OPEP,¡'\TICNS, DESCRIPTICilS & RESULTS
-----
10,045'/0'
Hole Plugged
Back
f/10,830' to
10,045'
20"C.9j2'
13 3/8" C. 4008'
Completed velocity survey & reran dipmeter f/7600' to 570
(faulty tape on 1st one). Shot 45 SWS rec. 35, 1óst 9 & 1
misfire. RIH w/BRA #73 & RR bit #71. Circ. & condo mud on
toPOf,fish @ 10,678'. Pooh. RIH w/614' of 3~" tail on 5"
D.P.
RIH w/614' of ~" tail on 5" D.P. Equalized 500 sxs. c1. "G"
w/10% sand, 1% CFR-2 and .1% HR7 thru D.E. 3~". Hung @
10,675'. 40 bbls. water ahead & 6 bbls. behind. C.I.P. @
06:30 8/23/80. Pooh. RIH w/bit #71RR on BRA #74. Wait on
cmt. @ 13 3/8" shoe.
10,045~/0'
Hole Plugged
Back
f/10,830' to
10,045'
20" C.-J82'
13 3/8' C. 4008'
RIH & tag plug @ 10,017' @ 0200 hrs. 8/24/80. Polished off
hard cmt. to 10,045'. Pooh. Tested BOPE.. RIH w/Dy?a~Drill
#18 on BRA #75 with bit #72.
10,045'/0'
Hole P_ugged
Back
f/lO,830' to
10,045'
20" C. 982'
13 3/8' C. 4008'
10,188f /143'
20" C. 982'
13 3/8'~C.4008'
Completed trip in hole. Oriented Dyna-Dri1l 850 rt. of H.S.
w/SDC steering tool. Dyna-Dri1l Run #18. Ùyña-Dril1ed f/
10,045' to 10,095'. Pooh. RIH w/bit #73 on BRA #76 (30' bell.
Reamed Dyna-Drill run. Directiona11y drilled l2~" hole f/
10,095' to 10,188'.
10,419'/231' Ran survey @ 10,158'. Directionally drilled l2~" hole f/
20" C. 982' 10,188' to 10,408'. Ran survey @ 10,378'. , Directionally
13 3/8" C.4008' drilled l2~" hole f/lO,408' to 10,419'. Pooh. Trip was
ragged for 1st 32 stds. Had tight spots @ 8422' and 7983'.
RIH w/bit #74 on BRA #77 .
10,746 /327'
20" C. 982'
133/8"C.4008'
Directionally drilled l2~" hole f/lO,4l9' to 10,525'. Ran
survey. W.L. parted while pulling off bottom w/survey
instrument. Pulled 3 stds. of d.p. and rec. W.L. Pooh w/
instrument. Directiona11y drilled l2~" hole f/10,525' to
10,746'.
10,935' /189'
20" C. 982'
13 3/8' 'C. 4008 '
Pooh w/drill pipe. Had tight spots @ 10,517', 10,174~, 8523',
8461', and 8398'. Remainder of hole condition was good. RIH
w/bit #75 on BRA #78 (60' belly). Did not see tight spots
on trip in. Reamed 30' to bottom. Directionally drilled
121/4" hole f/lO,746' to 10,935'. Circ. and make 10 stand.
short trip. :
'--
LEASE
TRAIL RIDGE UNIT
DATE
ETD
91
8/29/8C
11,135'/200'
20"C.982'
13 3/8" C.4J08'
92
8/30/8C
11,403'/268'
20" C. 982'
13 3/8" C. 4008'
93 8/31/80 11,633'/230'
20" C. 982'
13 3/8" C. 4008'
94 9/1/80 11,819'/186'
20" C. 982'
13 3/8" C. 4008'
95 9/2/80 12,009'/190'
20" C. 982'
13 3/8" C. 4008'
96 9/3/80 12,028'/19'
20" C. 982'
13 3/8" C.4CO8'
97
9/4/80
12,028'/0'
20" C. 982'
13 3/8" C. 4008'
'-t
SHb-r:r D
P G- .t
A ~ !;o,
U~Hc;! OIL Ca"PPJN OF CALIFCRrJIA
\ ILL ¡ :ECCRD
\',ELL r:o.
1
FlEW EIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.ATICNS, DESCRIPTIOìlS & RESULTS
Finished 10 std. wiper trip - hole in good shape. Direction-
ally drilled 12~" hole f/10,935' to 11,135'. Pooh. RIH w/bit
#76 on BRA #79. Hit bridge @ 10,922'. Pipe was stuck. Worke
pipe w/Ke11y. Pipe moved down the hole 19' to 10,941'. Could
not pull up. Jarred on pipe for 45 min. Pipe moved down the
hole. Reamed down to. 10,977'.
Worked pipe back up thru tight spot @ 10,922'. Pulled pipe to
10,800'. Reamed down f/10,800' to 11,135'. Directiona1ly
drilled l2~' hole f/l1,135' to 11,299'. Pipe stuck - jarred
free. Drilled f/ll,299' to 11,403'. Dropped survey and Pooh.
Had tight spot @ 10,845'.
Rec. survey instrument and RIH w/bit #77 on BRA #79. Reamed
60' to bottom. Directional1y drilled l2~" hole f/ll,403' to
11,633'. Made 10 std. wiper trip. Wiper trip was smooth.
Directiona1ly drilled l2~" hole f/1l,633' to 11,819'. Slugged
pipe, dropped survey, and Pooh. Hole is in good shape.
Rec. survey. RIH w/bit #73RR on BRA #80 (60' belly). Reamed
60' to bottom. Hole in good shape on trip. Directionally
drilled l2~" hole f/ll,8l9' to 12,009'.
Directionally drilled l2~' hole f/12009' to ~2028'. Surveyed
Circ. bottoms up. Made 15 std. short trip. Hole in good
condition. Pooh. Layed down monel d.c.'s. Rigged up
Schlumberger unit. Worked on leak in unit.
Repaired Schlumberger W.L. unit. RIH w/DIL log. Ran DIL f/
12,028' to 9800'. Had unaccePtable SP curve. Reran DIL f/
12,028' to 9800'. SP curve still showed signs of interference
and was unacceptable. Pooh w/DIL. Ran Sonic log f/12,028' to
9800'. Ran FDC-CNL log f/12,028' to 9800'. Reran DIL log w/
downhole ground f/12,028' to 9800'. SP curve showed slight
amount of interference but was acceptable (NOTE: All generator
on location were shut down during final DIL log run). Ran
Dipmeter f/12,028' to 9800'.
">
:
'-"""
w,SE
TRAIL RIDGE UNIT
V'
S~~CJ D
P - 'I
AG~ !;o,
U~HC:! OIL CaPfJN OF U\LIFCRrHA
\ ,ELL ¡ ~ECCRD
\\1:ll r:o.
1
FIELDßIGHT MILE LAKE PROSPECT
. - - ,
J),\TE 'ETD I DETAILS OF OPEP.l\TIONS, DESCRI?TICiIS & RESULTS
--------,-------.- --,.-.---- - ----- -----~_._---
98
I
'9/5/80\,
99
9/6/80
100
9/7/80
101
9/8/80
102
9/9/80
12 ,028 ' / ° '
13 3/8" C. 4008'
12,028'/0'
11,932' F.C.
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,028'/0'
11,932' F.C.
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,028'/0'
11,932' F.C.
13 3/8" C. 4308'
9 5/8" C. 12,028'
12,028'/0'
11,932' F.C.
13 3/8" C . 4003 '
95/8"C.12,028'
RIH w/SWS gun and shot 45 SWS. Rec. 28, had 15 misfires, &
lost 2. RIH w/2nd SWS gun and shot 17 SWS. Pooh. Rec. 17 SW~
Rigged down Sch1umberger. RIH w/bit #73RR on BRA #80 for clear
out. Reamed 120' to bottom. Circ. and condo mud for csg.
Pooh - saw 1 tight spot @ 11,206'. Remainder of trip smooth.
Down 2 hrs. to repair drawworks chain.
csg. Ran 81 jts. (3519') of 47# butt.
(8515') of 47# N-80 butt. csg.
Rigged up to run 9 5/8'
S-95 csg. and 210 jts.
Landed shoe of 9 5/8" csg. @ 12,028', float collar @ 11,932'.
Circ. mud and prep. to cmt. csg. Pumped 40 bb1s. of water
ahead of 800 sx. cl. IIG" w/l% CFR-2, .5% Halad 22-A, 3% KCL,
and 2 ~% pre-hydrated gel. Tailed in w/400 sx. c1. "G" w/l%
CFR-2. Dropped plug and displaced w/20 bb1s. water and 855 bbl
of mud. Bumped plug on F.C. w/2400 psi. CIP @ 13:38 hrs.
9/7/80. (NOTE: Had to displace cmt. job w/rig pumps as the
mud line to the Howco pumps was plugged). Released pressure
and floats held OK. Rigged up and injected 50 bbls. of mud
down the 9 5/8" x 13 3/8" annulus @ 3 BPM @ 1650 psi. Lifted
BOP stack and landed csg. w/slips in 13 3/8" head w/450M#.
Cut-off excess csg. and installed tbg. head.
CSG. DETAIL:
Item
Float Shoe
2 jts. S-95 csg.
Float Collar
79 jts. S-95 csg.
209 jts. N-80 csg.
1 N-80 cut-off
Landed Below KB
Length
1.62
92.06'
1.65'
3,417.86'
8,473.03'
17.28'
. ..
Dep_t h
12,028.00'
12,026.38'
11,934.32'
11,932.67'
8,514.81'
41.78'
24.50'
Installed and tested tbg. head. Installed BOP stack. Revamped
pitcher nipple, choke, and kill lines. Changed 9 5/8" rams to
5" in BOP. Installed 5" liners in #1 mud pump. Ran SDC Gyro
survey f/ll,900' to 4000' while revamping equipment.
Completed running Gyro survey. Rigged down SDC. Tested BOP,
choke lines, kill lines, and manifold to 5000 psi. Tested
Hydri1 to 3000 psi. Worked 3 hrs. to repair leak in pitcher
nipple. RIH w/bit #78 on BRA #81 (clean out assembly) to
7871'. (Picking up D.P. rubbers on each joint). Could not
pick up D.P. w/400M# @ 7871'. Circ. and condo mud. Rotated
D.P. for 30 min. Attempted to pull D.P. Could pull w/pumps
on but nQt w/pumps off. Rotated 30 min. and Pooh w/350M# to
400M# pull. Found pin missing from one rubber and several
other rubbers had slipped causing excessive hole drag & torque.
RIH w/bit #78 on BRA #81 while pulling off all D.P. rubbers.
,~
"-
w'\SE TRAIL RIDGE UNIT
DATE
103
9/10/80
104
9/11/80
105
9/12/80
106
9/13/80
107
9/14/80
ETD
12,028'/0'
11,932' F.C.
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,028'/0'
11,932' F.C.
13 3/8" C. LOOB'
9 5/8" C. 1¡,028'
12,038'/10'
13 3/8" C. LO08'
9 5/8" C. 1~,028'
12,180'/142'
13 3/8" C. LO08'
9 5/8" C. 12,028'
,
12,301'/121'
13 3/8" C. LO08'
9 5/8" C. 1':,028'
~
S~EET D
P - at
AG~ !;a,
U~'lIC;! OIL Ca"PfJrf OF û\LIFCRrJIA
\ jELL ¡ ~ECORD
\\tLL r:o,
1
FIELD EIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.¡'\TIONS, DESCRIPTIOilS & RESULTS
RIH w/bit #78 on BRA #81. Tagged F.C. @ 11,932'. Attempted
to test csg. to 5,000 psi. Pressure bled to 3000.psi in l~ mir
Pressured back up and formation took 3 BPM @ 4700 psi. Pooh WI
d.p. RIH w/Howco RTTS and set @ 7951'. Tested csg. above
RTTS to 5000 psi - OK. Pumped in below RTTS w/3 BPM @ 3500
psi. RIH w/RTTS and reset @ 10,013'. Tested below RTTS to
5000 psi - OK. Pumped in above RTTS w/3 BPM @ 3500 psi. Reset
RTTS @ 8601'. Tested below RTTS OK and pumped in above RTTS.
Reset RTTS @ 8201'. Tested below RTTS OK and pumped in above
RTTS. Reset RTTS @ 8160'. Pumped in below RTTS and tested
above RTTS OK. Reset RTTS @ 8171' and tested below RTTS OK.
Pumped in above RTTS w/3 BPM @ 3500 psi. Isolated leak
between 8160' and 8171' (csg. collar @ 8165'). Pooh w/RTTS.
Finished Pooh w/RTTS packer. RIH w/Howco EZSV cmt. rete & set
@ 8123' DPM. R.U. Howco and tested lines to 6000 psi. Pumped
into formation w/3 BPM @ 3950 psi. P.U. out of rete Pumped
10 bb1s. of water, 400 sx. c1. "G" w/.5% CFR-2 (15.8 ppg), 2
bbls. of water and 55 bbls. of mud. Stabbed into retainer
trapping 1200 psi on annulus. Pumped into formation @ 3BPM &
3950 psi. Pressure went to 4300 psi when cement hit formation
& continued to increase to 5000 psi with 50 bb1s. cement below
rete Sqz. held 5000 psi w/pumps off. CIP @ 11:05 hrs. 9/11/80
P.U. out of ret. & reversed out 32 bb1s. (156 sx.) of cement.
Circ. & condo mud. Pooh. RIH w/bit #79 on BRA #82 (clean out
assembly). Tagged rete @ 8125'. Drill on ref.
Dr1d. cmt. ret. @ 8125'. Drld. 56' of firm cmt. f/8l25' to
8181'. Closed rams and pressured csg. to 3500 psi - OK.
Pressured up to 4000 psi - OK. Pressured up ~o 4200 psi and
broke down sqz. Pressure bled f/4200 psi to 2700 psi in 45
min. Held 2700 psi (.89 psi/ft. gradient @ 8165' TMD). RIH
to F.C. @ 11,932'. Drld. F.C. @ 11,932', cmt. and float shoe
@ 12,028'. Drilled 8 1/2" hole f/12,028' to 12,038'. Circ.
btms. up and Pooh. RIH w/ 9 5/8" RTTS pkr. and set @ 8200'.
Pressure tested csg. shoe w/3500 psi and 76 PCF mud (.85 psi/
ft. gradient). Held pressure for 30 min. Released RTTS and
Pooh. RIH w/bit #78RR on BRA #83 (locked up assembly).
Directiona1ly dr1d. 8~" hole f/12,038' to 12,161'. While dr1g.
had influx, @ 12 BPH, of formation water. (Chlorides increased
f/250 to 500 PPM). Drld. 8~" hole f/12,16l' to 12,180' while
raising mud wt. to 78 PCF. Flow into wellbore stopped.
Continued drlg. 8~" hole £/12,180' to 12,240'.
f/12,233' to 12,240' (69 FPH). Circ. btms. up.
o£ gas o"£f btm. Directional1y drilled 8~" hole
12,301' while raising mud wt. to 80 PCF. Circ.
had 16 units o£ gas off bottom. Dropped survey
and Pooh. Had 1 tight spot @ 12,230'. !
Had drlg. break
Had 36 units
£/12,240' to
bottoms up -
instrument
w,SE
DATE
109
110
III
112
113
114
115
116
117
~
~
TRAIL RIDGE UNIT
108
9/15/80
9/16/80 '
Em
12,370'/69'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,370' f 0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
9/17/80 12,440'/70'
- 13' 3/8" C. L,008'
9 5/8" C. 12,028'
9/18/80
9/19/80
9/20/80 I
9/21/801
9/22/80
9/23/80
9/24/80
12,570'/130.
13 3/8" C. LO08'
9 5/8" C. 1~,028'
12,649'/79'
13 3/8" C. 4008'
9 5/8" C. 12,028'
,I r I
12,744,' /95' ,
13 3/8" C. 4008'
9 5/8" C. 12,028'
,I I
12" 90]} 1157'
13 3/8" C. 4'008'
9 5/8" C. lZ,028'
13,083'/182'
13 3/8" C. LO08'
9 5/8" C. 12,028'
13,189'/106'
13 3/8" C. LO08'
9 5/8" C. 12,028'
13,282'/93'
13 3/8" C. LO08'
9 5/8" C. 12,028'
~
S~~q D
P -.,
AGt.. !;o.
U~\IIC! OIL Ca.ppJN OF Cl\lIFCRflIA
\.ELl ¡:ECC~
\',ELL r:o.
1
FIELD ~IGHT MILE LAKE PROSPECT
DETAILS OF OPEP.J'\TIONS, DESCRIPTIGilS & RESULTS
--~-
-----
'\
Finished Pooh w/bit #78RR. Rec. survey instrument. RIH w/bit
1/80 on BRA #84 (45' DeIly). Directional1y drilled 8~" hole
f/12,301' to 12,337'. Had dr1g. break f/12,332' to 12,337'
(30' - 45'/hr). Circa bottoms up. Samples showed siltstone
w/small amounts of sand and 26 units of gas. Continued to
drill 8~" hole f/12,337' to 12,370'. Had dr1g. break f/12,361
to 12,370' (30'/hr). Had influx of formation water while
drilling. (Mud wt. was cut f/80 PCF to 79 PCF). Circa bottom~
up while raising mud wt. Samples showed sand w/interbedded
coal and siltstone. Pulled up to shoe of 9 5/8" csg. Circ..
and raised mud wt. to 82 PCF.
Circa and cond. mud. Raised mud wt. to 85+ PCF. Pooh w/d.p.
(down l~ hours to repair rotary table). Tested BOPE - Hydri1
to 2500 psi and rams, Kelly cocks, and choke manifold to 5000
psi - OK. Installed bowl protector and RIH w/30' of 7!t;" x 4"
core barrel w/8!t;" x 4" core head.
Finished RIH w/core barrel #1 on BRA 1185. Cut 4" core f/
12,370' to 12,400'. Pooh and rec. 29.8' of core. Layed down
core barrel. RIH w/bit #81 on BRA #86 (locked up assembly).
Reamed 60' to bottom. Directional1y drilled 8~" hole f/12,400'
to 12,440'.
.. ..
Directional1y drilled 8~" hole f/12,440' to 12,570'. Circa
and Pooh. Had tight hole f/12,274' to 12,182'. RIH w/bit
#82 on BRA #87 (30' belly).
Finish RIH w/bit #82 on BRA #87 (30' belly). Reamed 60' to
bottom. Directionally drilled 8~" hole f/12,570' to 12,649'.
Made short trip. Had tight spots @ 12,556' and 12,475'.
Ran survey. Directiona11y drilled 8~" hole f/12,649' to
12,744'. Ran survey and Pooh. Had tight spots @ 12,608' and
12,513'. (NOTE: Stabilizers had clay packed around them).
RIH w/bit #83 on BRA #88.
Directionally drilled 8~" hole f/12,744' to 12,880'. Surveyed
and made 6 std. short trip. Trip was smooth. Directiona11y
drilled 8~" hole f/12,880' to 12,901'.
Directional1y drilled 8~" hole f/12,90l' to 12,973'. Ran
survey. Directiona11y drilled 8~" hole f/12,973' to 13,083'.
Directional1y drilled 8~" hole f/13,083' to 13,096'. Surveyed
and made 8 std. short trip. Had 470M# drag on 1st 3 stds.
Directional1y drilled 8~" hole f/13,096' to 13,189'. Dropped
survey and Pooh. :
Pooh w/ d. p. RIH w/bit #84 on BRA 1188. . Had no tight spots or
fill. Directiona11y drilled l2~" hole f/13,189' to 13,282'.
LEASE -
TRAIL RIDGE UNIT
-~-'
DATE t
--- ~ -~----<.
118
119
120
121
122
9/25/80
9/26/80
9/27/80
9/28/80
9/29/80
ETD
t,
j
- I
13,294'/12'
13 3/8" C. *008'
9 5/8" C. 1,?,028'
13,294'/0'
13 3/8" C. ~008'
9 5/8" C. 12,028'
13,294'/0'
13 3/8" C. LO08'
9 5/8" C.12!028'
13,294'/0'
13 3/8" C. LO08'
9 5/8" C.12!028'
13,294'/0'
13 3/8" C. 4J08'
9 5/8" C. 12,028'
~
~
S~~q D
P - 't
AGl.. !;o,
U~\IICJ OIL Ca'ppJN CF CJ\LIFCRrJIA
\1ELL ¡~ECORD
\\Ell. r:o,
1
EIGHT MILE LAKE PROSPECT
F I Ell)
DETAILS OF OPEr.i\TIONS, DESCRIPTIOilS & RESULTS
--- ------
---.--- -------_---:...---:.... - -
Directionally drilled l2~" hole f/13,282' to 13,294'. Broke
rotary chain. Pooh for short trip while repair chain. Pulled
to 12,981' - tight hole. Picked up Kelly and circ. and
worked thru tight spot. Pulled to 12,401' w/460M# drag. Pipe
was stuck after standing back the 9th stand of d.p. P.U. Ke11
and circ. and jarred down w/40M#. (Circ. pressure dropped
from 2250 psi to 1600 psi @ 47 SPM). Pipe would not move.
Jarred up w/550M# - pipe would not move. Rigged up S.D.C. and
RIH w/GO W.L. Spinner survey to check for d.p. washout.
Logged up from 12,377' to surface w/spinner survey. Survey
indicated all fluid going out the bit. R.D. GO W.L. R.U.
Dialog string shot and CCL on SDC.
Repaired S.D.C. W.L. unit. RIH w/Dialog CCL & back-off charge
to 295'. Backed-off d.p. @ 295'. Pooh w/9 jts. of d.p.
Layed down 1 jt. RIH w/8 jts. of d.p. & 1 - 15' pup jt. P.U.
Kelly & scrwed into fish @ 295'. R.U. How~o & broke circ.
Now have 2100 psi w/47 SPM. Pumped 5bb1s. water, 5 bbls. die-
sel, 60 bbls. black magic - SFT pill, 2 bbls. diesel, 2 bbls.
water, & 157 bbls. mud. (Have 15 bbls. of pill outside d.p.
and 45 bbls. of pill inside d.p.). Jarred on d.p. (up w/525M#
& down w/140M#) for 15 min. every 30 min. Plugged d.p. after
4 hours - held 2000 psi. R.U. Dialog & RIH w/CCL, free-point
indicator, and back-off charge. Found free-point in x-over
below 6 1/4" Johnston jars @ 12,153' (D.C.'s below x-over
showed 25% free). Put left hand torque into d.p. for backoff &
. d.p. came free. Had P.U.of 4l0M#, slack-off of l70M#. Pooh w/
W.L. Pulled d.p. to shoe of csg. Could not circ. down d.p.
Reversed out pill from d.p.
Finished reversing out pill & Pooh w/d.p. Recovered entire
drill string. RIH w/bit#85 on BRA #89 (locked-up assembly).
Cleaned and doped each connection on BRA on trip in. Circ.
and condo mud @ 12,000'. Raised mud wt. to 96 PCF.
Finished conditioning mud and reamed hole f/12,028' to
12,350'. Had high torque & rotary chain broke. Pulled up
to shoe of csg. and repaired rotary chain. RIH & reamed f/
12,350' to 12,557'. Rotary clutch failed. Pulled to csg.
shoe & replaced pads on rotary clutch. RIH and reamed f/
12,557' to 13,140'.
Continued reaming f/13,140' to 13,200'. Pipe torqued up
and drill string parted high. P.U. 1 jt. and screwed
back into box. Pulled up and pipe parted w/250M#. Screwed
back into box and pressured up - pipe held 3000 psi. P.U. w/
d.p. and pipe parted @ 250M# pull. Pooh. RIH w/7 5/8" O.S.
w/6~" grapple on 9 jts. HWDP, 1 jt. S-135 d.p. and 1 - 15' pup
jt. Picked up Kelly and worked over top of fish @ 361'. RIH
w/Dialog CCL and string shot. While torquing to the left the
d.p. backed off. Pooh. Found d.p. backed off on top of O.S.
RIH w/d.p. and screwed into O.S. Released:O.S. and Pooh.
RIH w/7 5/8" O.S. and 6 3/8" grapple - ,Ç.ould not latch onto
fish. Pooh. RIH w/6~" grapple and latched onto fish @ 361'.
RIH w/Dia10g CCL and string shot. Made backoff @ 982'. Pooh
w/W.L. and d.p. Layed down O.S. and 2 bad joints (tool joint
box showed some pulled threads but no external damage). RIH
w/S-135 d.p. and screwed into fish @ 982'. Jarred up on fish
- pipe would not move. Torqued pipe to the right and jarred
down - pipe came free after 3rd time. Had pick up of 535M#.
Pooh w/d.p. Break, clean, dope & retorque each connection.
. ..-.....
~
S~L..q D
P ... a,
AGL !;a.
U~HC;J OIL Ca'pfjrf OF CALIFCRiJI^
\ ¡ELL ¡ ~ECŒ-UJ
.LEASE TRAIL RIDGE UNIT
. ~ .'"
nTIE 'Ðm I
.-. - --- .-- _0.___---
123
9/30/80
124
10/1/8 )
125
10/2/80
126
10/3/8e.
127
10/4/8C
128
10/5/8C
13,306'/12'
13 3/8" C. :'008'
9 5/8" C. 12,028'
13,404'/98"
13 3/8" C. 4008'
9 5/8" C. :"'2,028'
13,404'/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,404'/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,404/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,404'/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
\J"_LL r:o.
1
FIELD EIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.f'\TICNS, DESCRI?TICiIS & RESULTS
.---
-----~- -
. ....
--.-------- -
Finished Pooh. Laid down all grade "E" d.p. and ~ - 6~"
steel D.C. 'so Cleaned bit and changed jets. RIH w/bit #85RR
on BRA #90. Picked up new S-135 d.p. on top of X-95 d.p. to
replace "E" and 3 - D.C.'s. RIH to shoe of 9 5/8" csg. and
broke circ. RIH to 13,183'. Reamed f/13,183' to 13,294'.
Directionally drilled 8~" hole f/13,294' to 13,306'.
Directionally drilled 8~" hole f/13,306' to 13,404'. Drill
string stuck w/bit @ 13,396' while picking up for connections
Worked pipe to 550M# - could not see jars working. Pump
pressure dropped f/1800 psi to 1000 psi @ 46 SPM - probable
washout. Made blind backoff to remove Kelly screen. Pooh
looking for washout. RIH and tagged top of fish @ 1540'.
Spaced out and screwed into fish - checked torque and P.U.
R.U. Go. W.L. on S.D.C. and ran spinner survey. Spinner
showed 49% of flow exiting drill string @ 3100'. Ran carbide
and confirmed washout. R.U. Dialog on SDC for backoff below
washou t .
RIH w/Dialog on S.D.C. Backed off drill pipe @ 3509'. Pooh.
Found washout 12" above pin end of 101st. joint @ 3131'. Laid
down backed off joint and W.O. jt. RIH w/d.p. and screwed
into fish @ 3514'. Broke circ. w/41SPM @ 1800 psi. RIH w/
Dialog on S.D.C. to free-point. Pipe was 100% free @ 12,125',
100% stuck @ 12,500'. Shot string shot @ 11,998' (top of
HWDP) for back-off. Pooh. Rec. d.p. and 2.j~s of HWDP. Top
of fish @ 12,058'. RIH w/BRA 1191 (2 jts. HWDP, 6!¡;" jars,
3 - 6~" D.C. 's, 8 jts. HWDP, drill pipe).
RIH w/BRA #91 and tagged top of fish @ 12,071' (13' low).
Screwed into fish. Broke circ. w/32 SPM @ 2200 psi. Had
1 plugged jet. Circ. and condo mud while working pipe -
raised mud wt. to 100 PCF. Spotted black magic - 8FT pill
w/60 bbls. of pill outside d.p. and 40 bbls. inside d.p.
Worked d.p. and moved 1 bbl. of pill every hour. Could
see 2 sets of jars moving (1 set moved @ 370M# pull and
the other set moved @ 440M# pull). Could not get 2nd set
of jars to hit.
Continued to work d.p. Moved 1 bbl. of
8FT pill every 2 hours @ 10:00 hrs. 10/4/80.
to 600MII pull.
Worked pipe up
Continued to work d.p. Could not see 2nd set of jars travel.
R.U. Dialog and ran free point. It showed 100% free @ 12,164'
100% stuck @ 12,400'. R.D. Dialog. Continued to work stuck
d.p. Regained movement in 2nd set of jars @ 440M#, jarring
w/2nd set of jars @ 555M#. Worked d.p. and moved 1 bbl. 8FT
pill every 3 hours. Had max. pull on d.p. of 600M#.
~
LE~SE TRAIL RIDGE UNIT
DATE
---
129
10/6/80
130
10/7/80.
131
10/8/80
132
10/9/80
ElD
,
I
I .
13,404'/0'
13 3/8" C. .+008'
9 5/8" C. 12,028'
13,404'/0'
13 3/8" C. 4.008'
9 5/8" C. 12,028'
13,404'/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
13 404' /0'
, I
T.O.F. @ 13,313'
13 3/8" C. ~008'
9 5/8" C. 1~,028'
~
S 1-£1. CJ D
P - I'
AGt: ! D.
U~Hc;J OIL Ca'pplN OF Cf\LIFCRiJIA
\jELL ¡~ECORD
\'r~LL r:o.
1
EIGHT MILE LAKE PROSPECT
FIElD
DETAILS OF OPEPj\TIONS, DESCRI?TICiIS & RESULTS
---
Continued to work stuck d.p. while moving SFT pill 1 bbl.
every 3 hours. R.U. Dialog and RIH w/FPI tool stópped @
13,234' (in lowest Johnston jars). Free point tool showed
100% free @ 13,230'. Pooh w/FPI. Bottom of tool showed marks
as if setting down on something hard. RIH w/l 5/8" spudding
assembly. Spudded thru tight spot @ 13,234' on 2nd t!t. RIH
to Totco ring @ 13,380'. Ran through bad spot @ 13,234'
several times - did not see it. Pooh. RIH w/FPI & shot
assembly - could not get below 13,234'. Pooh - left shot
string in hole. R.D. Dialog. Worked 10 rounds of left-hand
torque into d.p. and slacked off. Let sit for 1 hour w/
torque trapped. P.U. and released torque - got 6 rounds back.
Worked 2 more rounds back out. While working d.p. - pipe
parted @ 460M#. One man injured when d.p. parted.
Pooh w/parted d.p. (D.P. parted in body of S-135 @ 385'). RIH
w/8 1/8" O.S. w/5" grapple and latched onto fish @ 427'. RIH
w/string shot and CCL to backoff. While putting in left-h~nd
torque the d.p. backed off @ 60'. Screwed back into d.p. and
released O.S. Pooh. Redressed O.S. RIH and latched onto fis
@ 427'. RIH w/string shot and CCL and backed off d.p. @ 760'.
Pooh and rec. fish. Layed down parted jt. and backed off jt.
RIH and screwed into fish @ 760'. Worked stuck d.p. up to
550MII. R. U. Dialog and RIH w/l 7/8" jarring and spudding
assembly - stopped @ 13,088' W.L. (HWDP). Could not work
thru. Pooh. RIH w/string shot and CCL - could not get below
13,088'. Pooh. RIH w/l 5/8" O.D. jarring Anå spudding
assembly and jarred on bad spot @ 13,088'. Jarred thru bad
spot and RIH to Totco ring. Worked thru bad spot several
time. Pooh.
RIH w/string shot and CCL and located top of stab. @ 13,311'.
Worked in left-hand torque and backed off drill string @
13,311'. Pooh w/W.L. R.D. Dialog. Pooh w/drill string.
Pulled 425M# thru open hole section - no tight spots. Had
390M# pull in csg. Layed down 21 jts. of bent HWDP, 2 jars
and 3 - 6~" D.C. 'so RIH w/BHA #92 (screw-in sub, DOT jars,
3 - 6~" D.C. 's, DOT jars, 10 - HWDP). Strapped, rabbited, and
retorqued d.p. while going in hole.
Strapped d.p. in hole. Stopped @ shoe of csg. and circ. and
condo mud. RIH - picked up and broke in 27 jts. of
new S-135 d.p. Tagged top of fish @ 13,313'. Screwed into
fish. Jarred on fish for- 5~ hrs. w/jars hitting @ 525M#. R.U.
Dialog and RIH w/free-point indicator - could not get below
top of fish @ 13,313'. Had to work tool loose. Pooh w/f.p.
tool. Tool was bent. RIH w/CCL and string shot. Backed off
drill string @ 13,313'. R.D. Dialog. Pooh w/d.p. Had 420M#
drag in open hole.
\
~
LEASETRAIL RIDGE UNIT
DATE
JETD
1-
---<-- ~.-
133
10/10/80
13,404'/0'
TOF @ 13,312'
13 3/8"C. 4008'
9 5/8"C. 12,028'
134
10/11/~0
13,303'/0'
TOF @ 13,312'
13 3/8" C. 4008'
9 5/8"C. 12,028'
135
10/12/EO
, I
13,404' /0'
ETD 13,195'(cmt.)
TOF @ 13,312'
13 3/8" C. 4008'
9 5/8" C. 12,028'
136
10/13/80 13,404'/0' '
13,195' ETD (cmt.)
- ..
TOF @ 13,312'
13 3/8" C. LO08'
9 5/8" C. 12,028'
~
S~&.t] D
P - 'I
AGL !;a,
U~'JIC;! OIL ca.ppJN OF U\LIFCRrIA
\ 1ELL ¡ :ECC~
\..ELL r:o,
1
F I Ell) EIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.i\TICNS, DESCRIPTICi!S & RESULTS
---
, .-
--- - - - ------- -
Finished Pooh w/d.p. - left screw-in sub in hole. Top of fis1
@ 13,312'. RIH w/bit 1184RR on BRA 1193 (reaming assembly) to
shoe of 9 5/8" csg. Circ. and condo mud - raised wt. to 102
PCF. Pump pressure dropped from 1000 psi to 750 psi. Pooh
looking for washout. Found washout @ 2170'. (18" above pin
in 70th joint of old S-135 d.p.). RIH to shoe of 9 5/8" csg.
and ~inish conditioníng mud. Reamed 8~" hole f/12,028' to
12,955' .
Finished reaming f/12,955' to 13,312'. Circ. and condo mud.
Pooh. RIH w/10 jts. (305') of 3~" tbg. on 5" d.p. Tagged toI
of fish @ 13,312'. Picked up to 13,309' and circ. capacity oj
pipe. Pumped 10 bbls. of water ahead of 100 sX. Cl "G" cmt.
w/1% CFR-2, .15% HR-7, and 10% sand. Displaced w/4 bb1s. of
water and 226 bb1s. of mud. CIP @ 1700 hrs. 10/11/80. Pu11e(
14 stds. wet. Attempted to circ. - pipe was plugged. Pooh.
Finished Pooh - had 10 jts. of tbg. and 12. jts. of d.p.
plugged w/cmt. Tested BOPE's. RIH w/bit 1186 on BRA 1193.
Tagged cmt. @ 13,176'. C.O. to firm cmt. @ 13,195' (114'
above top of fish). Circ. clean and Pooh. RIH w/10 jts. tbg.
on 5" d.p.
RIH w/3~" tbg. on 5" d.p. to shoe of 9 5/8" csg. Circ. and
wait for cmt. to arrive (bulk cmt. was contaminated). RIH and
tagged cmt. @ 13,195'. Circ. and R.U. Howc~.. Pumped 10 bb1s.
of water ahead of 60 sC. of c1 "G" cmt. w/1% CFR-2, .15% HR-7,
10% sd. Displaced plug w/3 bb1s. of water and 226 bb1s. of
mud. CIP @ 10:20 A.M. 10/13/80. Pulled 6 stds. wet - broke
circ. OK. Pulled to shoe of csg. and circ. bottoms up.
Pooh. Laid down 3~" tbg. RIH w/BHA 1195 (C.O. assembly).
13 404'/0' RIH w/bit 1f86RR on BHA#95 to shoe of 9 5/8" esg. Circe & wac.
" f RIH & tagged plug @ 13,165' (145' low). Drilled l' of plug to
!3,167 ETD ,cmt.p1ug) 13,166'. Drilled off @ 12MII. Circ. btms. up. Condo mud tc
TOF @ 13 312' 102 PCF. Drilled l' of plug to 13,167'. Drillea off @ 20MII.
13 3/3" è. 4C08' Pulled up & hung up @ 13,134'. ,Worked up t¡hru tight spot w/
9 5/8" C 12 028' 460MII - 470MII. Reamed f/13,134 to 13,141 w/30 Mil. Reamed
., thru tight spot 4 times - now smoothed out. Circ. & Pooh.
Repaired oil pump on drawworks. M.U. bit 1187 on BRA 1196 for
Dyna-Dri11 Run 1119. Replaced drawworks drive chain. RIH w/
BRA 1/96.
137
10/14/80
138 10/lS/8C 13,199'/32'
13,167' KOP - - -
~TOF @ 13,312'
13 3/8" C. 4008'
9 5/8" C. 11,028'
139 10/16/8C 13,210'/11'
13,167' KOP
TOF @ 13,312'
13 3/8" C. 4008'
9 5/8" C. 12,028'
Finished RIH w/BRA 1196 for Dyna-Dri11 Run 1119. Broke circ.
R.U. S.D.C. steering tool. Oriented tool 70-750 left of H.S.
Dyna-Dri11ed f/13,167' to 13,199'. Dyna-Dri11 failed. R.D.
S.D.C. Pooh w/dri11 string. Laid down Dyna-drill. M.U. and
RIH w/bit 1188 on BRA 1/97 for Dyna-Dril1 run 1120.
Finished RIH w/bit 1188 on BRA 1197 for Dyna-Drill Run 1120.
Trip was smooth. RIH w/S.D.C. steering tool and oriented D/D
700 left of H.S. Dyna-Dri1led 8~" hole f/;1.3,199' to 13,210-'.
Reamed hole every 3'. While dr1g. @ 13,210' the III mud pump
blew a valve cap gasket. Shut the pump down and tried to pick
up - pick was stuck. Worked pipe up to 550MII - could not see
travel in jars. Tried to pull high w/SDC W.L. Could not pull
through jars @ 13,074'. Put 7 rounds of R.H. torque into dri1:
pipe & attempted to hold torque w/tong - crimped top jt. of
d.p. (new S-135). Released torque & worked S.D.C. W.L. thru
jars. Pooh w/W.L. R.D. S.D.C. Made blind backoff @ + 2560'.
Replaced crimped jt. Screwed back into fish. R.U. Dialog &
ran freepoint. Pipe was free @ 12,150' & stuck @ 12,160'.
Had small amount of movement to 12,900. Pooh & R.D. Dialog.
LEASE
~
TRAIL RIDGE UNIT
D.\TE ETD
140 10/17/8) 13,210'/0'
13 3/8" C. LO08'
9 5/8" C. 12,028'
141 10/18/80 13,210'/0'
13 3/8" C. LO08'
9 5/8" C. 1~,028'
143
144
145
146
142
10/19/80
13,210'/0'
13 3/8" C. LO08'
9 5/8" C. 12,028'
10/20/8~ 13,210'/0'
13 3/8" C. 4308'
9 5/8" C. 12,028'
10/21/80
13,210'/0'
12,111' T.O.?
133/8"C.4003'
9 5/8" C. 12,028'
10/22/80
13,210'/0'
12,111' T.O.:?
13 3/8" C.40)8'
9 5/8" C.12, )28'
10/23/80
13~210'/0'
12,14;l' T. O. "?
13 3/8" C.4038'
9 5/8" C.12,)28'
~
SHE...tJ D
P - 'I
AGl. !;o,
U~Hc;J OIL Ca"PfJN OF CALIFCRrlIA
\ ¡ELL ¡ :ECC~ill
\'IELL r:o.
1
F I Ell) EIGHT MILE LAKE PROSPECT
DET"!LS o~ OPEP.i\TICNS, DESCRIPTIOnS & RESULTS
.---.
Spotted 100 bb1s. of black magic - SFT pill w/60 bb1s. outside
and 40 bb1s. inside of pipe. Worked stuck pipe up to 550M#.
Moved 1 bbl. of pill every hour.
Continued to work stuck pipe. R.U. Dialog & ran freepoint.
Pipe was free @ 12,150', stuck @ 12,160'. (no change from 1st
freepoint). Backed off pipe in HWDP at 12,003' W.L.M., 11,991
D.P.M. Pooh. RIH w/BHA #98 (D.O.T. jars, 3 RD's, HWDP).
Screwed into fish @ 11,991' and jarred on d.p. Jars tripping
525M#. Moved 1 bbl. of pill every 2 hours. Put in 10 rounds
of R.H. torque and slack off to 75M# when not jarring. Changec
to moving 1 bbl. of pill every 3 hours. Had no pipe movement.
Continued tq jar on stuck d.p. for 15 min. every 30 min.
Pressure held @ 850 psi when pumped last bbl. of pill (possible
plugged bit). R.U. Dialog and ran freepoint. Pipe was free
in stretch to 12,150', partially stuck @ 12,175', had some
movement down to 12,960'. Pipe was free in torque to 12,150',
partially stuck @ 12,155', no movement past 12,190'. Attempted
to back off at 12,155' - no good. While trying to work L.H.
torque into pipe, the top joint was crimped. Cut d.p. off
below crimped joint - 2.5' above rotary table, picked up
drill string w/overshot, and removed d.p. stub. Installed Ke11
into string. Attempted 2nd B.O. @ 12,155'. Pipe backed off
OK. Pooh w/d.p. Found actual backoff under.~op D.O.T. jars
@ 11,991'.
RIH w/BHA #98 (screw-in assembly). Circ. at top of fish.
Screwed into fish at 11,991'. R.U. Dialog and RIH w/free
point tool and string shot. Checked free point - stuck
at 12,160'. Backed off d.p. @ 12,124' WLM. Pooh w/W.L. -
R.D. Dialog. Pooh w/d.p. Found back off at 12,111' D.P.M.
RIH w/BHA #99 (washover assembly w/60' of wash pipe).
RIH w/BHA #99 (washover assembly) to shoe of 9 5/8" csg. Circ.
and cond. mud and raised wt. to 112 PCF. Washed down f/12,028'
to top of fish @ 12,111'. Worked down f/12,028' to top of
fish (2 hours) and washed over fish f/12,111' to 12,144'.
Had excessive torque @ 12,144'. Wash pipe hung up while
trying to P.U. Jarred loose w/450M#. P.U. to 12,135'.
Washed back to tight spot @ 12,144'. Continued to washover
fish f/12,144' to 12,155'~ Washed out mud1ine @ surface.
Pulled W.P. up in to csg. shoe and repaired mud1ine. RIH &
worked over fish. Washed f/12,155' to 12,172'. Could not
get deeper. Pooh to shoe of 9 5/8" csg. and circ. btms. up.
Circ. btms. up. Pooh. Laid down W.P. RIH w/BHA #100 (screw-
in sub, bumper sub, jars, 6 - D.C.'s, accelerator, 9 - HWDP).
Screwed into fish @ 12,111'. Jarred on fish @ 550M# for 2
hours. Did not see any movement below top of fish. R.U.
Dialog. RIH w/FPI, string shot, and CCL. :Found top joint of
fish free and 50% of 2nd joint free. Found movement down to
jars @ 13,043'. Could not get inside jars. Pulled to 12,141'
and attempted baclo:fif no good. Pooh w/W.L. String shot had
misfired. RIH w/string shot and CCL. Backed off d.p. @
12,141'. Pooh w/W.L. Pooh w/d.p.
~
~
S~S-CJ D
P - at
AG~ ! D,
U;'lICJ OIL Ca.p{\jN OF CALIFCRrH^
\1ELL ¡~ECC~
lEASE
TRAIL RIDGE UNIT
DATE
t
-I
147
10/24/80
148
10/25/80
149
10/26/80
150
10/27/80
151
10/28/8(
152
10/29/8C
ETD
I
I
_I.
13,210' TD
12,028' ET) (cmt.)
12,141' TCF
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,210' TD
12,028' ETJ (cmt.)
12,141'TOF
13 3/8" C .AO08'
13,210' TD
12,048' ETJ (cmt.)
12,141' TOE
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,085'/37"
12,048' K.O.P.
12,141' T.G.F.
13 3/8" C. 4008'
9 5/8" C. ~2,028'
12,114'/29'
12,048' KOP
12,141' T.O.F.
13 3/8" C.4C08'
9 5/8" C. 14,028'
12,114'/0'
12,048' K.O.P.
12,141' T.O.F.
133/8"C.40C8'
9 5/8" C.12,028'
\..ELL r:o,
1
FIElDEIGHT MILE LAKE PROSPECT
DETAILS OF OPEP./\TIONS, DESCRIPTICilS & RESULTS
---
.- ---~ ~
Pooh w/d.p. Rec. 1 jt. (30') of HWDP. RIH w/8!r." scalloped
washover shoe & 2 jts. of 7 5/8" washpipe on 5" D.P. Worked
over top of fish @ 12,141'. Washed down to 12,151'. Made
connection and could not get back over fish. Pooh - laid
down washpipe. RIH w/10 jts. (306') of 3~" tbg. on 5" D.P.
to 12,141'. R.U. Howco. Circ. and pumped 10 bb1s. of
water ahead of 150 sxs. c1. "G" w/1% CFR-2, .15% HR-7, and
10% sand.
Displaced cmt. w/4 bb1s. of water and 201 bb1s. of mud.
CIP @ 12:30 a.m. 10/25/80. Pulled 5 stds. of D.P. wet.
Circ. and condo mud. Had no cmt. to surface. Pooh - laid
down 3~" tbg. RIH w/9 5/8" RTTS pkr. on 5" D.P. Set pkr.
@ 8295'. Pressured above RTTS to 900 psi (.9 psi/ft. grad.)
to test squeeze @ 8165'. Held pressure 30 min. - OK.
Pressure below RTTS to 900 psi for 30 min. - OK. Pooh w/
RTTS pkr. RIH w/bit #86RR on BRA #102 (clean out assembly).
.
Tagged cmt. @ 11,534'. c.o. firm cmt. f/11,534' to 11,600',
stringers f/11,600' to 11,830', and firm cmt. f/11,830' to
12,028'. Circ. and condo mud. Pooh w/D.P. RIH w/RTTS
and set @ 8290'. Pressured below pkr. to 1350 psi to test
csg. shoe to .9 psi/ft. gradient. Held pressure for 30 min.
- OK. Pooh w/RTTS.
Finished Pooh w/RTTS pkr. RIH w/bit #89 o~ BRA #102 for
Dyna-Dri11 Run #21 to shoe of 9 5/8" csg. R.U. S.D.C.
wire1ine. Had a kink in W.L. and had to rehead W.L.
Oriented tool face 700 left of H.S. Dyna-dri11ed 8~" hole
f/12,048' to 12,085' (had to stop drilling several times
due to pump problems - blown packing, blown gaskets, lost
prime) .
Directiona11y drilled 8~" hole f/12,085' to 12,098'. Pooh w/
W.L. Pooh w/D.P. RIH w/bit #90 on BRA #103 for Dyna-dril1
Run #22. Checked pumps. R.U. SDC W.L. Oriented tool face
700 left of high side. Dyna-dril1ed 8~" hole f/12,098' to
12,108'. Developed leaks in 2 tool joints above rotary table.
Pooh w/W.L. Replaced leaking jts. RIH w/W.L. Re-oriented
dyna-dril1. Directiona11y drilled 8~" hole f/12,108' to
12,114'. (Had dr1g. break f/12,104' to 12,107'. Saw 31
units of gas, chlorides increased to 1250 ppm, and had a
slug of light mud - 110 ~CF - to surface). Raise mud wt.
while drlg.
Worked dyna-drilll~ hours trying to make it drill. Toøl was
stalling out on bottom. Pooh w/SDC W.L. Pooh w/dri11 string
(down 2 hours to repair chain on drawworks). Drill collars
had some clay stuck in spiral flutes. RIH w/bit #91 on BRA
11104 (30' belly - follow-up assembly) to shoe of 9 5/8" csg:
Circ. and raised mud wt. to 116 PCF. While raising weight had
a chlorides increase from 1250 PPM to 1500 PPM and a slug of
mud which was cut to III PCF. Raised mud weight to 118 PCF.
Had no more entry. Reamed dyna-dri11 run f/12,048' to 12,114'.
l£¡\SE
D~TE
154
155
156
157
158
159
160
~
TRAIL RIDGE UNIT
-----
153
I
10/30/EO
10/31/8C
11/1/80
11/2/80
11/3/80
11/4/80
11/5/80
I
.
I
12,209'/95'
12,141' T.C.F.
13 3/8" C. 4008'
9 5/8" C. U,028'
ETD
12,354'/145'
13 3/8" C. LO08'
9 5/8" C. 12,028'
12,454'/100"
13 3/8" C. LO08'
9 5/8" C. 12,028'
12,533'/79'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,637'/104'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,716'/79'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,774'/58'
13 3/8" C. 4:>08'
9 5/8" C. 12,028'
11/6/80, 12,870'/96'-~
13 3/8" C. 4..)08'
9 5/8" C. 12,028'
~
S~~q D
P - 'I
AG~ !;o,
U~\l I c: J 0 ILea .pPJ N OF O'\LI FCRi J IA
\Æ~LL ¡ :ECC~ill
--. \.ru. r:o.
1
FIELD EIGHT MILE LAKE PROSPR~T
DETA! LS OF OPEP,¡\ TI eNS I DESCR I PT I Ci IS & RESULTS
----
Directiona11y drilled 8~" hole f/12,114' to 12,209'. Dropped
survey and pulled to shoe of 9 5/8" csg. Rec. survey. Pooh.
RIH w/bit #92 on BRA #105 (locked-up assembly).
Completed RIH w/bit #92 on BRA #105. Reamed 60' to bottom.
Directiona11y drilled 8~" hole f/12,209' to 12,304'. Made
short trip to shoe of 9 5/8" csg. Had 30M# drag over normal
pick up weight f/12,169' to 12,165'. RIH and directiona11y
drilled 8~" hole f/12,304' to 12,354'.
Continued drlg. 8~" hole f/12,354' to 12,399' while raising
mud wt. to 122 PCF. Dropped survey. Pulled to csg. shoe
to rec. survey. Trip was smooth. RIH to 12,399'. Could
not get eigher pump operating. Pulled back to csg. shoe to
repair pumps (1 hour). RIH and directionally drilled 8~"
hole f/12,399' to 12,454'.
.
Made short trip to csg. shoe. Had max. pull of 240M#. RIH
and directiona1ly drilled 8~" hole f/12,454' to 12,520'.
Dropped survey and Pooh. Had 20M# drag f/12,328' to 12,266'.
Remainder of trip smooth. Pooh w/d.p. RIH w/bit #93 on
BRA #105. Reamed 60' to bot tom. . Direc tiona1ly drilled 8~"
hole f/12,520' to 12,533'.
Directiona11y drilled 8~" hole f/12,533' to 12,587'. Made
short trip to shoe of 9 5/8" csg. Trip was.smooth. RIH.
Directiona11y drilled 8~" hole f/12,587' to 12,637'.
Directionally drilled 8~" hole f/12,637' to 12,648'. Dropped
survey. Pulled to csg. shoe w/d.p. and rec. survey. RIH.
Directionally drilled 8~" hole f/12,648' to 12-,716'. Lost
400 psi pump pressure while increasing pump strokes by 5.
Pulled to csg. shoe. Checked all surface equip. Pooh
looking for washout. Found W.O. in 121 st. jt. in slip area
(old S-135 d.p.). Pumped dry job and Pooh.
Finished Pooh w/d.p. Changed bit. RIH w/bit #94 on BRA #105.
Reamed 30' to bottom. Directionally drilled 8~" hole f/
12,716' to 12,774'. P.U. to make connection and lower Kelly
cock parted w/300MII. P.U. RIH w/8 1/8" O.S. and 6 3/8"
grapple. Worked over fish @ 60' (had 19' of squat in d.p.).
Picked up fish w/385M# (40M# over normal P.U.). Removed
O.S. and fish. Pulled to,shoe of csg. Had 20M# drag in open
hole. Pumped dry job and repacked Kelly swivel.
~inished Pooh w/d.p. Laid down 3 jts. of bent HWDP.
Serviced rig. RIH w/bit #95 on BRA #105. Reamed 60' to
bottom. Directiona1ly drilled 8~" hole f/12,774' to 12,870'.
, .-....
LEASE TRAIL RIDGE UNIT
DATE
ETD
161
11/7/80
12,877/7'
13 3/8" C. 4:>08'
9 5/8" C. 12,028'
162
11/8/80
12,965'/88'
13 3/8" C. 4:>08'
9 5/8" C. 12,028'
I
163 11/9/80 13,005'/40'
, 13 3/8" C. 4308'
9 5/8" C. 12,028'
164 11/10/8C 13,005 ' /0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
165
11/11/80
13,063'/58'
13 3/8" C. 4Ò08'
9 5/8" C. 12.028'
"
166 11/12/80 13,175'/112'
13 3/8" C. 4008'
9 5/8" C. 12,028'
167 11/13/80 13,300' /125'
13 3/8" C. 4038'
9 5/8" C. 12,328'
168 11/14/80 13,357'/57'
13 3/8" C. 4)08'
9 5/8" C. 12,028'
169 11/15/80 13,471'/114'
13 3/8" C. 4CJ08'
9 5/8" C. 12,028'
~
SHEa D
PAG[ ib.
UNIC;J OIL Ca.PP4JY Cf O\LIFCRrHA
\iELL I ~ECOffi)
\\ELL r JO .
1
FIELDEIGHT MILE LAKE PROSPECT
DETA!LS OF OPErATIONS, DESCRIPTIOnS & RESULTS
Directiona1ly drilled 8~" hole f/12,870' to 12,877'. Dropped
survey and Pooh w/d.p. Inspected lower Kelly va1vé, saver sub,
top and bottom of Kelly, Kelly spinner, upper Kelly valve,
and swivel. Found crack in double pin left-hand sub on top
of Kelly. Changed bits. RIH w/BRA.
Waited on new sub. Waited on sub to arrive. Finish RIH w/bit
1196 on BRA 11105. Directionally drilled 8~" hole f/12,877' to
12,947'. Kelly spinner locked up. Pulled to csg. shoe.
Laid down Kelly spinner. RIH w/d.p. (NOTE: Had a man
injured when hit by tongs while RIH). Directionally drilled
8~" hole f/12,947' to 12,965'. Dropped survey and Pooh w/d.p.
Pooh w/d.p. Rec. survey. RIH w/bit #97 on BRA 11105: Direct-
iona1ly drilled 8~" hole f/12,965' to 13,005'. Lost 230 psi
pump pressure. Pooh 1óoking for washout.
Finished Pooh looking for washout - could not find a W.O.
Broke and redoped all connections on BRA. Changed bit.
RIH w/bit 1198 on BRA 11105. Broke circ. every 15 stds -
did not find W.D. Pump pressure is normal. Stop @ csg.
shoe and repaired rotary chain and III mud pump (2~ hrs.).
RIH to bottom. Engauged rotary and lost power to rotary
drive bushing. Pooh to shoe of csg. Circ. and repaired
rotary drive. (Down 11 hours).
. ..
Installed rotary drive shaft. RIH to bottom. Circ. Pulled
to csg. shoe. Circ. and finished repairs to rotary drive
shaft. (Down a total of 10~ hrs.). RIH w/bit #98 on BRA
#105 and directiona11y drilled 8~" hole from 13,005' to
13,013'. Pulled up to csg. shoe and repaired rotary torque,
pump pressure gauge, and wt. indicator. (Down 3 hrs.).
RIH w/Bit #98 on BRA #105 and directionally drilled from
13,013' to 13,093'.
Drilled 8~" directional hole from 13,063' to 13,154'.
Made short trip - hole condition good. Drilled from 13,154'
to 13,175'. Had 95 units gas from coal 13,135' to ~,140'.
Drilled 8~" directional hole from 13,175' to 13,229'. Made
short trip - hole condition good. Drilled from 13,229' to
13,300'. Dropped survey & Pooh. Had 120 units gas from
coal 13,235' to 13,247'.
RIH w/bit 1199 on BRA #105.
hole f/13,300' to 13,357'.
Directional1y drilled 8~"
Continued drilling 8~" hole f/13,357' to 13,404'. Circ. and
made short trip. Had tight spot @ 12,500' (400M# pull).
RIH - hole condition good. Directiona11y qri11ed 8~" hole.
f/13,404' to 13,471'. Had dr1g. break f/13,46l' to 13,471'
(24 FPH). Circ. up to shoe. Pulled to.csg. shoe and circ.
btms. up.
LE;\SE TRAIL RIDGE UNIT
D.~TE
170
11/16/8)
,
171
11/17/80
172
11/18/80
173
11/19/80
174
11/20/8C
ETD
13,554'/83'
13 3/8" C. ~008'
9 5/8" C. 12,028'
13,600'/46'
13 3/8" C. LO08'
9 5/8" C. 12,028'
13,670' /70' ,
13 3/8" C. LO08'
9 5/8" C. 1~,028'
13,708'/38'
13 3/8" C. bO08'
9 5/8" C. 12,028'
13,708'/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
~,
~
S~E...t1 D
P ...."
AG~ ! D.
U~\J I C;! 0 ILea 'pr~ N OF Cl\LI FCPJ J IA
\ jELL ¡ :ECORD
tELL r:o,
1
FIELOEIGHT MILE LAKE PROSPECT
DETAILS OF OPEPj\TIONS, DESCRIPTIOilS & RESULTS
Saw coal on btms. up and,75 units of gas. RIH and
directionally drilled 8~" hole f/13,47l' to 13,554'.
Dropped survey. Pulled to shoe of 9 5/8" csg. Had tight
spots @ 13,439',13,377',13,253',13,102',13,004' and
12,717'. RIH w/W.L. to retrieve survey. Latched onto
survey and attempted to pull - parted W.L. Attempted to
pull W.L. w/catline - broke catline rope. W.L. fell down
d.p. Pulled 3 stds. of d.p. and found wire. Spliced onto
W.L. 'unit and attempted to pull survey - parted W.L. Pooh
w/d.p.
Finished Pooh w/d.p. - discarded W.L. Rec. survey inst.
~ound Totco ring upside down). Replaced 7 jts. of HWDP.
RIH w/bit #100 on BRA #105. Reamed thru tight spot @
12,717'. RIH and reamed 30' to bottom. Directionally
drilled 8~" hole f/13,554' to 13,600'. Pooh for short trip.
Pooh for short trip. Repaired rotary torque indicator. RIH-
t"rip was smooth. Direc tionally drilled 8~" hole f / 13,600'
to 13,643'. Made short trip. Had tight spots @ 13,542',
13,522',13,389',13,005',12,964',12,690' and 12,313'.
Were able to drop back and pull through with normal drag
in each case. (Indicates possibly coal being dragged up
the hole). RIH - trip in was smooth. Directionally drilled
8~" hole f/13,643' to 13,670'. . M
Directionally drililed 8~" hole f/13,670' to 13,708'. Pooh
for short trip. Had tight spots at 13,593' and 13,439'.
Dropped back thru each spot and they cleaned up. When
removed stand @ 13,397' could not pull off slip w/43Om#.
Latched onto stand of d.p. and drove down. P.U. Kelly
and reamed thru spot @ l3~397'. Pulled thru w/36Om#. Con-
tinue Pooh. Hqd to pull 410 - 4l5m# to P.D. off slips for
1st 6 stands. Each stand then pulled freely @ 360 - 37Om#
The next 4 stand required 39Om# to pull off slips. Set
back 11th stand @ 12,649'. Could not pull off slips w/43Om#.
Latched onto stand of d.p. and could not drive down. P.D.
Kelly and tried to rotate and drive down - could not.
Pulled up. Saw D.O.T. jars moving w/34Om#, hitting @ 475m#.
Continued working stuck d.p. Johnston jars are moving
@ 3lOm#, hitting @ 40Om#. Mixed 80 bbls. of Black Magic
SFT pill. Made blind backoff @ + 4200'. Installed 7' pup
joint. Screwed back intcr fish. Spotted Black Magic - SFT
pill w/30 bbls. outside of pipe and 50 bbls. inside. Pill
in place @ 10:30 p.m. Worked stuck d.p. for 20 minutes each
hour and moved pill 1 bbl. every hour. When not moving pipe
put in 10 rounds of torque and set weight of pipe down.
Continued working stuck d.p. and moving 1 bbl. of SFT pill
every hour. D.P. parted @ 348' while tryi~g to pull to
to 550M#. (D.P. parted in flash weld of tool joint box in
S-135). Pooh. RIH and tagged top of fish at 348'
fish did not move down hole. Pooh. RIH w/8 1/8" O.D. w/5"
grapple and latched onto fish @ 348'. RIH w/Dialog string
shot on S.D.C. W.L. Put L.H. torque into d.p. and un-
screwed from top of O.S. Pooh w/W.L. Screwed back into O.S.
and released from fish. Pooh. Redressed O.S. and RIH -
tighten each connection on trip in hole. RIH w/Dialog string
shot on S.D.C. W.L. Made back off @ 447'. Pooh. Laid
down parted jt. and shot joint. RIH and screwed into fish
@ 447'. Jarred on stuck d.p. - Earthquaker jars hitting@
4l0M#, D.O.T. 's @ 475 - 500M#.
,-.... .
E TRAIL RIDGE UNIT
LE;\S
D.~TE
ETD
175 11/21/80 13,708'/0'
13 3/8" C. LO08'
9 5/8" C. 1¿,028'
176 11/22/8() 13,708'/0'
13 3/8" C. LO08'
9 5/8" C. 12,028'
177 11/23/8C 13,708'/0'
13 3/8" C. LO08'
9 5/8" C. 12,028'
178
11/24/8C 13,708' T.D.
12,424' TOF
13 3/8" C. 4)08'
9 5/8" C. 12,028'
179
11/25/80
13,708' TD
12,424' T.O.:?
13 3/8" C. 4)08'
9 5/8" C. 12,028'
180
11/26/80
13,708' T.D.
12,445' T.O.:?
13 3/8" C. 4)08'
9 5/8" C. 12.028'
181
11/27/80
13,708' T.D.
12,445' T. O. ] .
13 3/8" C. 4)08'
9 5/8" C. 12,028'
182
11/28/80
13,708' T.D.
12,447' T.O.:?
13 3/8" C. 4)08'
9 5/8" C. 12,028'
...........
S~EIT D
P -"
AGt.. ! () .
UNIC;J OIL Ca'prJN OF O\LIFCPJHA
\ 1ELL ¡ ~ECC!~J)
\',rLL r:o I
1
FIELDEIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.I'\TICNS, DESCRIPTIOilS & RESULTS
Circ. and raised mud wt. to 126 PCF. Respotted B~ack Magic -
SFT pill w/30 bb1s. outsïde and 50 bb1s. inside. Jarred on
stuck d.p. and moved SFT pill 1 bbl. every hour.
Continued working stuck d.p. and moved SFT pill. Changed
to 1 bbl. of pill moved every 2 hours @ 8:00 p.m. 11/22/80.
Work pipe until 12:00 hrs. 11/23/80. Set back Kelly. In-
stalled 1 jt. of HWDP. R.U. Dialog FPI, CCL, and string
shot on SDC W.L. RIH - tools took 7 hours to run. Could
not get below 12,450' W.L.M. Could not get adequate collar
readings. Pooh w/W.L. tools.
Pooh w/W.L. tools. P.U. Kelly and circ. for 30 min.
Developed W.O. while circ. RIB w/FPI, CCL, and string shot.
Readings showed free in stretch @ 12,459', stuck @ 12,490'.
Had torque reading of 10 @ 12,459' (with a ~eading of 22
being free). Backed off drill string @ 12,424' (x-over on
top of drill collars). Pooh w/W.L. tools. Pooh w/d.p.
Laid down washed out jt. (W.O. in slip area of 20th jt. of
old S-135 d.p.). Finished Pooh w/d.p. Laid down DOT
jars and 9 jts. of bent HWDP. RIH w/BRA #106 (flat-bottomed
W.O. shoe, 2 jts. of 7 5/8" wash pipe, drive sub, bumper sub,
oil jars, 3 - 6 1/2" DC's, accelerator, HWDP).
. ..
RIH w/BRA #106 (washover assembly w/74.5' of swallow) to shoe
of 9 5/8" csg. Circ. and condo mud. Pump pressure dropped
from 1000 psi to 550 psi. Checked surface equipment and
tested to 2500 psi - OK. Pooh looking for washout. Did not
find W.O. RIB w/bit #99RR on BRA #107 to look for washout.
Staged in hole w/mud pump to 12,028'. Had no sign of washout.
Pooh w/d.p. and laid down old S-135 d.p.
Finished Pooh - laid down old S-135 d.p. RIH w/BRA #108 (wash-
over assembly) to shoe of 9 5/8" csg. Circ. and condo mud.
RIH and tagged top of fish @ 12,445' (21' low). P.U. off of
fish and broke circ. RIH w/o pump and worked over top of fish
@ 12,445'.
Washed over fish @ 12,445' to 12,519' in 2 hours. Circ. to
bring bottoms up into csg. Pooh to shoe of 9 5/8" csg.
Circ. bottoms up. Pooh wlwashpipe. Found d.p. rubber up
inside washpipe. RIH w/BHA #109 (screw-in sub, B.S., oil jars,
pump-out sub, HWDP) and screwed into top of fish @ 12,445'.
R.U. Dialog and RIH w/string shot and CCL on W.L.
Located string shot in XO @ 12,510' (below Johnston Jars)
and attempted to back-off. Did not get a back off. Pooh w/
W.L. Broke circ. and R.U. to run freepoint. RIH w/F.P.I.
CCL, and string shot. Indicated 100% stuck @ 12,481' (top'
of Johnston Jars) and partially stuck @ 12,468'. Backed off
in top of collars @ 12,445'. Pooh w/W.L. Pooh w/d.p. Rec.
X.O. on top of D.G. 'so Top of fish now @ 12,447'. RIH wI
BRA #110 (washover assembly w/screw-in sub).
~
UU,SE TRAIL RIDGE UNIT
DATE
183
11/29/8C
184
11/30/80
185
12/1/80
186
12/2/80
187
12/3/80
ETD
13,708' T.D.
12,447' T.O.F.
13 3/8" C. 4:>08'
9 5/8" C. 12,028'
13,708' T.D.
12,447' T.O.::?
13 3/8" C. 4)08'
9 5/8" C. 12,028'
13,708' T.D.
12,447' T.O.::?
13 3/8" C. 4)08'
9 5/8" C. 12~028'
13,708' T.D.
12,150' T.O.~.
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,708' TD
12,150' T.O.F.
13 3/8" C. 4(08'
9 5/8" C. 12~028'
~
Sr.~q D
PAGC 1:0.
U~HC:J OIL Ca'pf-J';Y Cf Cf\LIFCPJ'JI^
\ELL ¡ ~ECC~:J)
\',ELL r:o.
1
EIGHT MILE LAKE PROSPECT
F I Ell)
DETA!LS OF OPEP./\TICNS, DESCRI?TICiIS & RESULTS
Finished RIH w/BHA 11110 to shoe of 9 5/8" csg. Broke circ.
RIH - string took 7M# of weight @ 12,165'. Pulled up -
took 60M# over normal pick up to pull free. Picked up
Kelly and worked thru tight spot. Pulled up to shoe of
9 5/8" csg. Circ. and raised mud wt. to 128 PCF. RIH-
string took 5M# @ 12,165'. Picked up easily. RIH and did
not see tight spot. RIH to 12,413'. Latched onto Kelly to
tag fish. Pipe was stuck @ 12,413'. Pulled up to 550M#
and pipe pulled free. Circ. and worked pipe thru this spot.
Pooh to shoe of 9 5/8" csg. while keeping pipe moving. RIH
and tagged top of fish @ 12,447'. Worked over top of fish and
washed down f/12,447' to 12,472'.
Continued to wash over fish f/12,472' to 12,481' (34' in 7
hours). Washed over very firm formation f/12,468' to 12,481'.
Pooh w/wash pipe. Trip was smooth. Changed out dull rotary
shoe. RIH w/BHA #110. Broke circ. @ 6000' and @ shoe of
9 5/8" csg. RIH to top of fish @ 12,447'. .Worked over top
of fish easily and washed down to 12,481' easily. Washed
over fish and very firm formation f/12,481' to 12,487'.
Continued to wash over fish and firm formation from 12,481' to
12,501'. Washpipe slipped down from 12,501' to 12,519' w/o
rotating and w/o taking weight. Tagged top of fish w/screw
in sub @ 12,447'. Pulled to shoe of 9 5/8" csg. Pumped
dry job and Pooh. RIH w/BHA #111 (screw-in ~qb, B/S, Jars,
pump-out sub, HWDP) and tagged top of fish @ 12,447'. Screwed
into fish while running in hole w/F.P.I. Freepoint showed
100% stuck in stretch and torque @ 12,480' and 50% free @
top of fish @ 12,447'. Broke circ. thru fish w/2500 psi.
Circ. and worked pipe. Lost all movement in bumper sub.
Ran freepoint. Found pipe to be 100% stuck @ 12,300'.
Spot 20 bb1s. of black magic - SFT pill around fish. Ran
freepoint. It showed 100% stuck @ 12,160',50% free @
12,150' WLM in stretch. Backed off in HWDP @ 12,138' WLM.
Pooh w/d.p. Top of fish @ 12,154' D.P.M. RIH w/BHA #112
(screw-in sub, 2 bumper jars, Johnston jar, 18 - D.C. 's HWDP).
Broke circ. @ shoe of 9 5/8" csg. RIH and tagged bridge @
12,101'. Circ. down thru bridge and tagged top of fish @
12,150'. Wórked pipe and pulled to csg. shoe. RIH and
worked d.p. thru tight spot @ 12,101' while circ. bottoms up.
Had drag of 405M# (norma1.365M#). After circ. bottoms up
had normal drag of 365M/'. Pulled up to shoe of 9 5/8" csg.
Waited 2 hours @ csg. shoe. RIH w/BHA #112. Tagged bridge
@ 12,101'. Worked thru bridge and circ. bottoms up from top
of fish @ 12,150'. Drag continually decreased while circ.
from 410M# to 355M#. Pulled up to csg. shoe and waited 2 hrs.
RIH & tagged bridge @ 12,127'. Worked thru bridge (had dra~
of 400 - 420M#) and circ. bottoms up from 12,150'. Drag
decreased to 355M# while circ. Pulled up to csg. shoe and
waited 2 hours. RIH & saw bridge @ 12,127'. Worked thru
bridge. Pulled to. csg. shoe. Circ. and waited on orders.
1£;,SE
D~TE
189
190
191
192
193
194
195
~
TRAIL RIDGE UNIT
188
l2/4/8C
12/5/80
12/6/80 :
12/7/80
12/8/80
12/9/80
l2/l0/8C
l2/ll/8C
ETD
13,708' T.D.
12,150' T.O.F.
13 3/8" c. 4008'
9 5/8" C. 12,028'
13,708' T.D.
35' cmt. plDg
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,708' T.D.
35' cmt. plu:g
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,708' T.D.
35' cmt. plug
13 3/8" C. 4D08'
9 5/8" C. 12,,028'
~
S~~q D
P ...."
AG~ !.o.
U~\I I C; J 0 ILea 'pr~ N OF O\LI FCRi J IA
\ ELL ¡ ~ECC!1J
tELL r 10.
1
FIELD EIGHT MILE LAKE PROSPECT
DETAILS OF OPEP.t\TICNS, DESCRIPTIOnS & RESULTS
Circ. and wait on orders. Pooh and lay down HWDP, D.C. 's
and fishing tools. RIH w/HOWCO EZSV cement retainer on
drill pipe.
RIH w/9 5/8" EZSV cmt. rete on d.p. and set at 11,895'.
R.U. Howco and test lines to 6000 psi. Stab into rete
and get breakdown @ 2000 psi. Pumped in w/5 BPM @ 1500 psi.
Mixed and pumped 150 sxs. cl. "G" w/l% CFR-2, .8% Halad
22-A, 3% KCL. Stabbed into rete and put 100 sx. cmt. below
rete @ 11,895'. Had final rate of 4.5 BPM @ 2000 psi. Pulled
out of rete to spot 50 sx. on top of rete Had 1200 psi
back pressure on d.p. (mud inside d.p. was 112 PCF). Rev-
ersed out 50 sx. cmt. Circ. to balance system. Pooh laying
down d.p.
Finished laying down 7000' of 5" d.p. RIH w/9 5/8" EZSV
cmt. rete and set @ 3900'. Circ. and cond. mud. Set
blanking plug in rete Mixed and equalized 100 sx. cl. "G"
cmt. on top of rete @ 3900'. CIP @ 10:30 hrs. 12/6/80.
Pulled 3 stands and reversed clean. Pooh laying down d.p.
With O.E. d.p. @ 150', mixed and pumped 55 sxs. of cl. "G"
cmt. Had cmt. to surface. Pulled up to 35' and circ. out
cmt.
Removed BOPE.
Cleaned mud tanks prep. for rig down.
.. "
13,708' TD Cleaned mud tanks.
35' ETD (cmt. plug)
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,708' TD
35' ETD (cmt.)
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,708' TD
35' ETD (cmt.)
13 3/8" C. 4008'
9 5/8" C. 12;,028'
13,708' TD
35' ETD (cmt.)
13 3/8" C. 4008'
9 5/8" C. 12,028'
Prep. to move rig.
Rigging down.
Clean mud tanks and pit.
Rigged down into truck loads.
Rigging down into truck loads. Established injection int~
13 3/8" x 9 5/8" annulus. Cellar started filling up.
Pumped 200 sxs. cl. "G" w/l.O% CFR-2, .8% Halad 22-A & 3%
KCL followed by 400 sxs. cl. "G" w/2% CaC12. Displaced cmt.
w/300 bbls. Initial dis~. rate 5 BPM @ 1650 psi. Increased
to 2000 psi @ 3~ BPM. Press. decreased after 260 bbls. of
~ disp. to 1600 psi @ 3~ BPM. CIP 09:08 hrs. 12/10/80.
W.O.C. 12 hrs. Pumped in annulus @ 2~ BPM @ 1450 psi.
Pumped down 13 3/8" x 9 5/8",2 1/2 BPM @ 1450 psi. Shut
down 4 hrs. to check res. pit level (suspected spring filling
the pit). No inc. in pit level. Also no communication to
cellar. Resumed pumping l~ BPM @ 1500 psi: for 1st 3 hrs.
Froze up lines. Down 1 hr. thawing out lines. Resumed
pumping rate gradually inc. rate to 3 BPM @ 1500 psi.
LE;~SE
D.\TE
~
TRAIL RIDGE UNIT
ETD
196 12/12/80 13708' TD
35' ETD
13 3/8" C. LO08'
9 5/8"C. 12,028'
197 12/13/80 13708' TD
35' ETD
13 3/8" C. LO08'
9 5/8" C. 1Â,028'
198 12/14/80 13708' TD
35' ETD
13 3/8" C. LO08'
9 5/8" C. 12.,028'
199 12/15/8C 13,708' TD
0' ETD (cmt.)
13 3/8" C. 4008'
9 5/8" C. 12,028'
M9
MlO
MIl
M12
M13
M14
200
12/16/8C
13,708' TD
Surface ETD
13 3/8" C. lO08'
9 5/8" C. 12-,028'.
12/17/8C
13,708' TD
Surface ETD
13 3/8" C. 4008'
9 5/8" C. 12,028'
12/18/8C 13,708' TD
Surface ETD
13 3/8" C. 4D08'
9 5/8" C. 12,028'
12/19/80
12/20/80
12/21/80
12/22/80
~
Sr.EE1 D
P .-"
AGr.. !;o.
U~\l I C; J 0 ILea 'pr~ N OF Cl\LI FCR! J IA
\fELL ¡ ~ECO!,'1J
\"tLL r:o.
1
FIELDEIGHT MILE LAKE PROSPECT
DETA!LS OF OPEP./\TICNS, DESCRIPTIOilS & RESULTS
Completed pumping reserve pit clean.
of fresh water.
Displaced rn~d w/300 bb1s
Repaired Howco unit. Pumped 150 sxs. c1. "G" w/1% CFR-2, .8%
Ha1ad 22-A & 3% KCL followed by 1280 sxs. c1. "G" w/2% CaC12
down 13 3/8" x 9 5/8" annulus. CIP 11:15 hrs. 12/13/80.
Removed DCB spool. Filled top 10' of 9 5/8" esg. w/crnt. &
installed abandonment post.
Rigging down rig into truck loads.
Rigging down. (Bent A-leg on drillers side while lowering
it, lost control & dropped it).
Rigging down into truck loads.
with 29 sxs. of C1. "G" cmt.
Cemented rig water well
.. "
Rigging down.
(Released 1 crew 6 PM 12/17/80).
Rigging down.
Rigged down rig into truck loads. Released rig crews.
Repairing ripper cat. (Can't backfill pit until cat is
repaired.)
Rigging down.
Repairing ~ipper cat.
Repair airstrip.
lEASE
TRAIL RIDGE UNIT
DATE
ETD
M-15 12/23/80
M-16 12/24/80
M-17 12/25/80
M-18 12/26/80
M-19 12/27/80
M-20 12/28/80
M-2l 12/29/80
M-22 12/30/80
M-23 12/31/80
M-24 1/1/81
M-25 1/2/81
M-26 1/3/81
M-27 1/4/81
M-28 1/5/81
M-29 1/6/81
M-30 1/7/81
M-3l 1/8/81
M-32 1/9/81
M-33 1/10/81
M-34 1/11/81
M-35 1/12/81
M-36 1/13/81
M-37 1/14/81
M-38 1/15þ8l
M-39 1/16/81
M-40 1/1~/8l
M-4l 1/ 18/81
M-42 1/19/81
~
~
Sr.EE1 D
P _"
AGr.. !;o.
U~'JIC;J OIL Ca.pfJN OF CALIFCRrJIA
\ fELL ¡ ~ECORD
\',ELL r:o.
1
FIELD EIGHT MILE LAKE PROSPECT
DETA!LS OF OPEP.r\TIONS, DESCRIPTIOilS & RESULTS
Repairing ripper cat.
Repairing ripper cat.
Repairing ripper cat.
,
Repairing ripper cat.
Repairing ripper cat.
Repairing ripper cat.
Finished repairing ripper cat.
material.
Ripping dirt for use as fill
Ripped dirt and hauled to gravel pit.
Leveled pad and reserve pit.
Hauled fill material to gravel pit.
Leveled pad and reserve pit.
Hauled fill material to gravel pit.
Leveled pad and reserve pit.
Hauled fill material to gravel pit.
Leveled pad and reserve pit.
Hauled fill material to gravel pit.
Leveled pad and reserve pit.
Hauled fill material to gravel pit.
.. "
Finished hauling gravel to reserve pit.
"Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel.pit.
Ripping and contouring gravel pit. '
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
Ripping and contouring gravel pit.
---
I
t.... .."'~ ,..~
-) "11 r""','n~t.y
i.. .~ "",. 'I.. a... ~Jjdl"'¡.ui
". ..: \'! . !L~ f'" . ['\ i"> - 4'1
. '" di~.~ ~ it ~ ¡.J" "I~ -If
WELL UNION ~-
- Sec. 9, TlON, R10W, SM
cc~ I~"~ F7~ IT' DA'
œ ~ ¡J '~f; .J- ,~\ ~ II"
, ~ ' ~",~ ¡py,:,,¡ f U " ,r '~,>¡J",'¡; ~,,'" \;(\',', ~, I', t' ,
"" l\' ~I if'! " ¡ ~ "" i"!
'I~\ìì~, }'~~',' ....
-- --
- ". ì
1 ,-
--
j.
8 "
3~
MEASURED DEV I AT I ON
-- DEPTH - ANGI.=E-DIREc-T-ItJN
. .,"
, 1.
~,
... ...,. '.,.
A ,
r
~.
:t- . - ¡., '!f
" 'X'ilf>
who
..,; " "..
~;"" "-"vf¡. ':If>!','".
" ~ .
..
-"
>t -
TVD
TOTAL COORDINATES CLOSURES
-tATITUDE-- DEPARTURE ---- --- DISTANCE------ ANGLE-
SEG--#--
, .
" ,,' ',' , ,,' """"-'-"'.,-",-' ",,----- -,------ -p",,-,_w,-,,--,'....---- ",--
.~
t>
-- --0--- ()*- ~ 5~ E 0-;-00 0-; 00- N
483 1 *30' S SO* O'E 482.'34 4.06 S
515 1*30' N 83* O'E 514.93 4.30 8
," "'T---- --- -- 574 - --- 3~ 0' N 60~O""E S7~.--8'9 3-;57 b
81,' 635 4*30' - N 49* O'E- -- - 634.75 - ---- 1.25 S
,- 704 6*45' - N 46.* O'E --- 703.42 - w 3.32 N
"
:.-------825 7*45J N 46~ 8ë3-.4S 13-.3c-N
." 976 7*45' N 5S* O'E 973.07 26.86 N
,: 1013 7*45' N 57* O'E 1009.73 29.65 N
,~
. -- -----1-104----G*---(y-N-4-S~ 1-100-,;-07 36-.-49-N-
8,~ 1181 7*45' N 35* O'E ., 117E..52 43.55 N
, 1212 8*45' N 38* O'E 1207.20 47.12 N
12-36- - -11*lS~-N-44'-o-~ 1-289;-91----58;12- N----
1389 13* 0' N 52* O'E 1380.83 71.18 N
1482 14* 0' N 51* O'E 1471.26 84.70 N
. -j,5e.8----14*30~ N~E tSS;q-;-ß'2 ~8.:.-:J1 N
1661 14* 0' N 49* O'E 1644.76- 113.32 N
1710 15*15' N 45* O'E 1692.17 ---- 121.76 N
'<'-
-. -- -------1740--16*451 N-41~E -1-721~ 1-2T;-81-N
.~~ 1879 18*45' N 45* O'E 1853.38 158.79 N
1972 19*15' N 42* O'E 1941.31 180.75 N
- - -- 2066 ----21*4S~ N-43*-o'E 2029;-39 205-.;'02 N---
tÞ- 2159 22* 0' N 42* O'E 2115.66 230.57 N
-. 2212 22*30' N 40* O'E 2164.71- 245.71 N
_\.
- - --- --2271-24if-Q-J-N-41*---o-JE--2218;-92 -263;42-N
8,. 2333 2S* 0' N 43* O'E 2275.34 282.53 N
2366 26.*30' N 46* O'E 2305.06 292.75 N
--- 2439 - - 28*-O/-N-49*-O'C -236.'9¡;-'9~ -315-;.33 N
2573 30* 0' N 50* O'E 2487.15 - 357.. 52 N
2590 30*30' N SO* O'E 2501.83 3E.3.02 N
-- - --- 2662-- 30* 0' N 51* O'E 2564.03- 386.09--N---
2754 30*45' N 55* O'E 2643.40 414.08 N
2816 31* 0' N 55* O'E 2E$6.61 432.33 N
- ~
-- ---- 2910-- 34* 0-"'- N-59*-O-!E- -- -2775.88----- 459.83 N- ---
2%6. 34* 0' - N 60* O'E 2822.31- 475.72 N
3028 34* 0' N 60* O'E 2873. 71 493.. OEt N -- -
88
8:~
..
~
8 .'
.
Á,¡
8' I
,4 II
- ---
O;-oo--E- '0-;-00 0* o-r--ou- --- 1
4.84 E 6.32 S 50* 0' O"E 2
5.62 E 7.08 853*22'11"E 3
--7-; 81 - E - 8. sa---s- E.6*32' 4'3ttE --- --"4-
11 . 05 E 11 . 12 S 84*27' 51 liES
16.03 E 16.37 N 78*18'49"E 6
27; 02 E 30-.;""4-0--- ~ E.2* 44 -1-- 8" E"-- --- 7
42.71 E 50.46 N 57*50' 411E 8
46.85 E 55.45 N 57*40'10uE '3
55;-30 E--- ----e.€.,; 26---N SE.*34' 3süE- -----10
61.22 E 75. 13 N 54*34' 26"E 11
63.86 E 79.37 N 53*34'40"E 12
- 73.43 E - - -- ---93.65" -- N-51 *38" E.IIE - - m_- - 1 J -- - -- ----------- -
87.93 E 113.13 N 51* 0'30"E 14
104.92 E 134.84 N 51* 5'15"E 15
121-.;-14 £------t56-. 01--N-- 50*5(;' 23ft E ------lE.
138.41 E 178.89 N 50*41'30IIE 17
147.46 E 191.23 N 5O*27'11UE 18
153~10 E -l'3-3-;.43-N-SO* 8'42"E- ---1"3---
181.99 E 241.53 N 48*53'41"E 20
202.83 E 271"68 N 48*17'40UE 21
225.07 E -- -304.45-- N 47*40' 9'.E --- 22---
248.48 E 338.97 N 47* 8'29I1E 23
2E.1.64 E 358.93 N 46*47'55ftE 24
276.77 E--- --- 382. 09-N-4E.*24' SGUE -,---- 2S
2'33.97 E 407.73 N 4G* 8'1411E 26
304.02 E 422.05 N 4E.* 4'5411E ,27
328.GE. E ---- 455.47 -- N 46*11 J 9üE - --- - 28-- ----
378.QE. E 520.33 N 4G*35'57HE 29
384.62 E 528.88- N 46*39'16UE 30
412.60 E - 565.07---- N 46*54'- 4UE----31---------
449.75 E 611.34 N 47*21'51UE 32
475.81 E ~42.89 N 47*44'27UE 33
518.16 E 692.77 N 48*24'46I1E- ---- - 34- --- h - ----- -- - ----
545.14 E 723.52 N q8*S3'23HE 35
575. 16 E 757. 57 N 49*23' 4211 E- 36. - -- -- ---- ----- ---- -- ------ -- -- - -- u-
--
)
--P ~<' ~
1'" ~~ó> :I ?~
---- ____4l~ -~ ~---- t-
e~J' /J>.
~C2 ~o~ tf¡
. v~ 3? C
~ ~ -
~.
\r~.
~"
--
-- -- --- --
8 -----------
4339 29* 0' N 65* O'E 3985.59 814.24 N 1187.89 E 1440..16 N 55*34/17"E 52
4401 2'3*30' N 66* O'E 403'3.69 826.80 N 1215.46 E 1470.01 N 55*4E.'30"E 53
4589 29*15' N 58* O'E 4203.52 870.06 N 1296.82 E 1561.65 N 5E\* 8'29"E 54
4691- -28*1S!--- N--s.9*-O-!E 4292-.-94 89S.69-N-----1338..65 E------1E.10.67--- N -5E.*12J48"E-_n_--- 55
, 4785 28*15' N 60* O'E 4375.74 918.27 N 1376.98 E 1655.09 N 56*18' 6ltE SG
8.- 4909 28*15' N 60* O'E 4484.97 947.62 N 1427.81 E 1713.66 N 56*2S'411'E 57
~
'-----SObS 27*-G-'--N--62*-GLC ".623.-19 982-.G9-N 14~t-;,O7--E- -17BS-;¡-7'1---N- 56*36'-47"E 58
¿
8Þ 5158 27*45' N 64* O'E 4705.77 1002.10 N 1529.17 E 1828.27 N 56*45/44HE 59
- 5253 27* 0' N 67* O'E 47'30.13 1020.21 N 1568.92 E 1871.45 N se.*S7'S5"E (...0
t --5375--26*3Q.-L--N-60*-o~C 4899.08 -1044.70--N 1E.18.;O3 E---192S-.'3B-N-57r9~--41IE- -61
5436 27*45' N 5'3* O'E 4953.37 1058.81 N 1641.9'3 E 1953.77 N 57*11' 4"E 62
5503 28*30' N 61* O'E 5012.45 1074.60 N 1669.34 E 1985.31 N S7*13'4S"E 63
5627-- - 28*4s.~ -N 6-1*- O'E--S121. 30 1-103.-40 N 1-721.30 E-- - 2044-;. 59--N 57*20' 2OuE ----- 64
5752 29*15' N 61* O'E 5230..63 1132.78 N 1774.30 E 2105.08 - N 57*26'39ME 65
S842 29*15' N 62* O'E 5309.15 1153.77 N 1812.95 E 2148.94 N 57*31'37uE 66
-------- 5937 - 29*45-'- N 62*-O{E ~391-. 83 1175.73- N 1854.25 E---- 2195-. 58--N 57*37' 20llE -- 67
6024 29*30' N 62* O'E 5467.46 1195.92 N 1892.22 E 2238.47 N 57*42'22"E 68
6117 30* 0' N E~* O'E 5548.20 1217.58 N 1932.97 E 2284.49 N 57*47'34uE 69
---- ---- 6242-- --- 2'3*--O~-- N- 65* O-~E----- -565'1.00---- - 1245.05 N-- --1988. 05 E - 2345. 74 N 57*5E,' 33" E -- -- 70-- -- ---
6302 27*45' N 65* O'E 5709.79 1257.10 N 2013.89 E 2374.04 N 58* 1'37"E 71
6396 27* 0' N 66* O'E 5793.26 1275.02 N 2053.22 E 2416.90 N 58* 9'3711E 72
--- --- 6489---28*-~-N-€o8*-O-'~ 5875--.75----1291.80-N--2092.-75 E-- 2459.34--N 5S*18'SQIIE -73--
6614 26*30' N 70* O'E 5986.87 1312.31 N 2146.18 E 2515.60 N sa*33'20"E 74
6707 26*30' N 71* O'E 6070.10 1326.16 N 2185.29 E 2556.21 N S8*44'53"E 75
---- - - 6801 ---- 26*30~-N-+-l* O~E 6154.-23 --1339.8-1--N--- 2224.9S E- ---- 25'37.21--- N 58*56' 40IlE---- - 76 --- -----
6851 26*30' N 71* O'E 6198.97 1347.08 N - 2246.04 E 2619.03 - N 59* 2'4711E - - 77
6954 24* 0' N 72* O'E -- 6292.13 -- 1361.02 N- 2287.71 E 2661.'35 - N 59*15' ll1E - 78 --- -- ------ - .------. -- -- -------
~4__- -- - - - 7044--- - 23* O~ N-- 75*- O'E- ---6374.6E-- -1371,,-21-N -2322.. 11 E --- 2b96.- 74---N 59*26-' l;ï'-"E------79
-. -.-.- ---. -.' .-_.- ----- --'._----.-.--
. '---!,---- --3059-- --34* o-~-- N. Wo1LO-'E- -----28'3-9.4-1---
~3: 3122 33* 0' N 61* O'E 2951.94-
.~AI¡ 3221 34* 0' N 65* O'E 3034. SO
14': ¡--------3328--34*-1-S-!-----N Coi:!* --OLC 3-1-23.-07
~~' 3474 34* 0' N 63* 0' E 3243.93-
.~~¡ 3536 36* 0' N 68* O'E -. 3294.72
¡¿L_- ---3740----31-*4~--N--59-*--O'C J464.05
'4:=: 3810 30* 0' N 60* O'E 3524.13
8.:::; 3873 31*30' N E-2* O'E 3578.27
~ ~- -3'307- 3O*4S-!..--N--62*-(}{-E 360-7-.-38
3975 2'3* 0' N 58* 0' E 3666. 34
4057 28*30' N 60* O'E 3738.23
-- -- --- 4119--- 28*3O!--N--6O*- O~E 3792.-72
4211 28*45' N 65* O'E 3873.47
4244 28*45' N 65* O'E 3902..40
.~
-
8:'
I,
..
----- ---
-.-
8
-
8E
.
.~
.
8-
8::
.
-~::.
.. 1-
-. -
. ~-
.. .-
.- - -- . -"'" -
- -- --501-.- 73 N-- -- 5'30. 17 E - - - 774.62 - N ,+'3*37' 51" E - ---
S18.8S N E-20.44 E 808.79 N 50* 5'43"E
543.65 N E.G9.11 E 862.13 N 5O*54'22"E
-5'1Q-.43-N 722.-83 E--------,-'320.80-'-- N 51 *43( 14"C
608.25 N..---- -- 7'35.48 E 1001.38 N 52*35'4'3"E
622.9'3 N --.-. 827.83 E 1036.06 N 53* 2' 10" E
-673. 66-N -92'~.46 E 1147..-'32-N-54*--3/SG"C
691.90 N 960.41 E 1183.68 N 54*13'49uE
707.51 N 98B.58 E 1215.67 N 54*24'33"E
----71-5.- 76-N 1004.-10 E---- -1233.09--- N- 54*31-L-!-1I C
732.69 N p 1033.42 E 1266.81 N 54*3'3'48"E
753.01 N 1067.23 E 1306.14 N 54~o47'3'3"E
-767.-SG-N -10'32..85 E -1335. 60--~ N 54*54' 34"E
788.14 N 1131.93 E 1379.29 N 55* 9' 411E
794.8S N 1146.32 E 1394.93 N 55*15/45"E
- 37 ------- -
38
3'3
- 40
U:O~ !II' -."'. -""'- !t-"""", i"""'~4-^ t
41 - ,',' f¡'".-+t._""" ",'~;C.h,,- "i-.e'--..~,"'~'-- ~t-,," ,. '. ---
, '" i' .,. -",., """
"t¡"'~"",:'rl '~",,~-~)~¡ ~~ ~.
42 - ,I\t r~ t t ~-'~'\;-I~ ~¡,f/:£'-'" _.
4 . \a I ~ '/JJ ~Jl:W ~ ¡J -~...--
44
45
-46
47
48
.- --4';1-
50
S1
.--. ,---- - "..- ----'
.- --
~._- -
'" '^
.,
, '
)
---------'------- )-
---
-- - --.- -- ------ - - - - - - - ----- .--
.~:f
,
","
(""
8þ9
Jd
I
31
8~i
J3
3l
.:~;
8::"
-'
8.. I
844
""S
8ð;
.~,
.:-:
85.
1<..
8'~
8
11
7187 22*- 0/ N 65* O'E
7259 21* 0' N 66* O'E
7383~0*-0~~
- 7474 -- 20*45' - N 54* O'E ----
7541- - 21* 0-' N 52* O'E-----
76311 21 * 0' N-S-3*-Q.!-E
7758 20* 0' N 52* O'E
7878 19*45' N 52* a I E
8008-1-9*4S-!-- N- S 3*-4~-E
8160 19* 0' N S5* O'E
8297 19*45' N SS* O'E
8422-20*4~' N-SS*-O' C
8547' 21*30' N 57* O'E
8663 22* 0' N 55* O'E
-- --- -87-18 22*-GL--N-58*-- O/C
8787 22* 0/- N 64* O'E
8943 22* 0'. N 64* O'E-
- 9201- 22*-0' N (,5*-0-' C
9495 20*45' N 66* 0 I E
9746 20* 0' N 68* O'E
-9994-19*- 0 I N---69*--O I C
10158 19*50' N 78* O'E
10378 17*30' N 81* O'E
-- --10492---1-7*1~' N-81-*-OLC
10622 16*45' N 81* O'E
10716 16*30' N 84* O'E
10B39-16*4~' N 85*-01 E
110'30 19* 0' N 85* O'E
11260 19* 0' N 84* O'E
---11373 -- -18*4~ I N- 88*-01 r.:
11539 19* 0' N 89* O'E
11789 15*45' N 90* O'E
:.3t
.:;-
...:
..:
,,-
..~
~~
.5
:"
,
------ ------
8 --- ----
11932 16*45' N 90* O'E
11998 17*15' N 90* O'E
12184 19*45' N 80* O'E
_u - - - 12360 20*'-0' N ((~O' t:.
. - 12480 20* 0' N 83* O'E
12608 20* 0' N 79* O'E
-------- 12837 ----20*- O'-N- 7'3*- O"t:.
12925 19*30' N 84* O'E
13260 20* 0' N 79* O'E
--- -- 13514-- 20*30+- N--80~-O'E
.
.
...-,. -
6
6506. 77 .
6573.76 -'
6689-. -9-1
6775. 21~--..-
6837.82
6-921', . c~,
7040.78
7153.64
7275-. 'J')
7419.38
7548.62
7665-.-8')
7782.49
7890.23
794-1--..-23 .
8005.20 -
8149.85
B389..OG
8662.83
8898.13
91-31.-90
9286.57
9494.98
%03-.78
9728.10
9818.17
9936.-03
10174.90
10335. E.3
10442.5C
10599.63
10838.19
10975.48
11038. 59
11214.S7
1l380-; 4~
11493.25
11613.53
11828;; 7¿
11911.54
12226.83
-t2465;ï.:J
138'3.90 N 2373.47 E 2750.49 N 59*38'48uE 80
1400.84 N 23837.48 E 2776.74' N 59*42' 8uE 81
14-18..16--N '~43+.30- C -2819.-8(, N-S9*48' 24uE----- 82
1433.73 N ---_.- 2464.82 E 2851.47- N 59*4B'52"E 8Le;
1448.09 N. ------ 2483.88 E - 2875.18 --. N 59*45'2811E 84- -- 1'--
1468.-38-N ~S 1-0-.-33 E 2908.24 N-59*40' 30 II E --- . 8 ~.
1494.82 N 2544.78 E . 2951.33 N 59*34/11uE 86
1519.93 N . 2576.92 E 2991.78 N 59*28' onE 87
1546-.68-N . 261-1.-78- E :JO35-.-39 N- 59*21'58"E------88
1576.31 N -- - 2E.52.57 E 3085.59- - N 59*16'43J1E 89
1602.38 N 2689.80 E 3130.92-- N 59*12'59/1E ':;)0
162f--.-2Q-N2725..-24 - E 3174.-07-N-- 59*- 9-' 33" E---- 91
1652.39 N 2762.58 E 3219.05 N 59* 6/54J1E 92
1676.42 N 2798.22 E 3261.97 N 59* 4'26/1E 93
168"-7-. 79-N ~B1S-.-40 E-- 3282.55 N-59*--3' 28uE-------- 94
1700.32 N 2837.9'3 E 3308.37 N 59* 4'221tE 95
1725.94 N 28830.52 E 33E.6. 59 .-- N S9* 9' 30llE 96'
17&T-.5~ N 297'7-.75 E - 3462. 83 N---59* 18' 2€. II E --- 97
1811.98 N 3075.25 E 3569.38 N 59*2'3'34ItE '38
1846.12 N 3155.69 E 3656.03 N 59*40'18J1E 99
1876-.4(. N 3232.-71- E---- 3737.-85-N-59*51'59uC --100----
1891.93 N 3284.93 E 3790.. 80 N 60* 3' 3711E 101
1904. 76 N 3354. 16 E 3857 . 26 N E.O*24 , 30 u E 102-
. 1910iï09-N --3387. 78 E----- 3B89..-1~ N--E.O*35'- 5J1E- 103
1916.03 N 3425.32 E 3924.79 N 60*4b/42uE 104
1919.54 N 3451.98 E 3949.79 N E.o*S5'22uE 105
1922~2-N 3487 à 01 E---- 3982 ii OE. N uE.1 * --7 -' 31 u E-----1 OC,
1929.63 N 3563"75 E 4052.63 N 61*33'S8uE 107
1934"93 N 3618.84 E 4103.66 N 61*52' 211E 108
1937-;-4B-N -3E.5S.-30 E--41-37.-04- N--E.2* 4"2711E 10'3
1938.89 N 3708.':)9 E 4185.20 N E.2*24' suE 110
1939.54 N 3783.63 E 4251.78 N 62*sl'34I1E 111
)--
_..~, ~ t'I Ff~"'" - -I'.".d;;lì 1,' :M..: A ~--
ti ~ '. ~ '<,:-. ¡~ tr,'\ ~ ~.
:;¡;j,'-¡:,~Øìif," ~,"",- "'-W',',':;\;¡ .,,~.~ I, --w-, , , -
\,..-,;' '-'" ,j7í\ ?I .
~¡ä ;,~Lwi" i it..
- - ..--..---
-.- .- --
- ----- - ---. - --- - - ---
-- -. ---
- --- )
- . - _. .-
----
---
4287.43 N 63* 6'131tE 112
4304.65 N 63*13'11AE 113
4359.44 N 63*30'2€.uE 114
---------
4-J+17~ 25-- -N- 6-3*42" 28ItE---- 115
4456.65 N 63*sl'21"E 116
4498.49 N 64* l'12"E 117
4574.19- N 64*16'25"E --- --- 118----
4602.60 N 64*23' OUE, 119
- ---- - - -.- ---- - - ------------
4710.87 N (-.4*47' 1811E 120 -- -- ---
-- 4795~ 9S-WE.S*-3-r18uE 1'21
- -.
1939.54 N 3823.64 E
1939.54 N 3842.94 E
1944.68 N 3901.65 E
1835b. b1 N 3'36{Y:æ E--
1963. 73 N 4000.68 E
1970.58 N 4043.91 E
19as--.- S2 -t\t - --4120;- 80 E -- -
1989.92 N 4150.20 E
2006.64 N 4262.12 E
¿o2~66 N 43413;56 E
-'-
--- - ---
- - - -- - --- ----
.:¡:" , ! '
.ft' .
.'p"', ~', '<
~,. ,
"r' .
, , ,
- ;(;' ~
\; .
, '.
\'
. /k: ~ l yc.: JL.~ -1/. J I
Operator, Well Nane and Ntfœr '
Reports and Materials to be received by:
R~;red
Date Received I
(
I
I
/-J3-g¡!
I i
l~ --/~-3), j
i
.
." -
Canpletion Rep:>rt
Yes
Yes
"1 J. -If rf:/
1./1 ;¿ -1'- 9' II
~ -¡8"-g)
1-- I 3 -~ I
. I{-)$ - 'j!?-
lfl/J
,1J/J
, ! 1e>
!
Core Description I Y e- .s
~-~7 j
~tër ~rSurvey p ~ I Î -&?
«l.. ~ ~-
Incl ina lion 'sUrvey
'-
C~
Ihrectional sW:vey-:?
\./'V' ~-v'-
Drill Stan Test Reports
I' '1 t9 (', )
02 -}f-R}
---- -- ------- i
¡v)
Prcrluction Test Rep::>rts
/Vð fb.!;q4 fi/Í/ó
Yes o2-I8'--K/
- J- - I ?- ð' J
~/ L--- '---.~ ,"7
Logs Run
\ ~ - ,..
a V~\"'./L ~ -
Digit~zed Log rata V ~
/l / L . "\_./ /' " .
/ L, \/ -_/~ /
.' ; ',,'
"" ~ .¡;
. . :.' i \ '-
']
'r;;..- -:.-~.
'.~r~t .,
r I 1-.Q. 'J:" . -; -; °,
,- ,~. '~'. ,-,' r . '¡.
n-..t þ' ,::. "'~ .
L.Q e : ; ,~;
~\!~. \ -
'~.,' ; I
{ -.
Remarks
) tLt~
J. Ai(
L ¿( f~
L't-J--e"
,
I L&{ f ~
j
I L 4TE
I
I ~~ L -I-..
41('
~l.
. .
ðÆ~
Lit- +e-
~t.
01(
kt~
Late'
II
I ¡
I
I --
(
('
ALASKA OIL AND GAS CONSERVATION COMMISSION
Thru:
Hoyle H.
I
Chairman ~
Lonnie C. Smith
cœmSSione~~
Bobby FosterU"
Petroleum Inspector
Hamil to,A{f'
January 5,1981
wi tness Cement Retainers
and Plug Settings on
Union's Trail Ridge 11
Sec. 3, T20N, R1OW,
Permit #79-72.
Thursday ~cember 4, 1980: I traveled this date to Trail Ridge
'1 after Gary Bush, Union drilling engineer contacted Russ
Douglass, A.O.G.C.C., requesting permission to place this well in
suspension by placing cement retainers and cement plugs at vari-
ous depths.
When I arrived at the location I met with John Boulware, Union
4,r,i,lling cO;p.8ultAJ1t and during our conver8.tion John .ala thAt.
after he had run the 9 5/88 Halliburton E"'1Z drill retainer to
setting depth of 11,900 ft. he intended set^the retainer, break
down the formation and dispose of approximately 500 to 600 bbls.
of excess drilling mud. Since no form 10-403 has been filed nor
did I have access to any logs of the well, I contacted Russ
Douglass aÆa informed him of this. Russ said he saw no problem
in doing this and to let them proceed as planned.
F\:r;daY/Dece~r ~f 19~0: The retainer was set at 11,895 ft. and
approximately 500 bbls. of mud was pumped into the formation
below. At. 10,00 am Halliburton began mixing a 150 sack, 15.2
ppg. slurry. One hundred sack s were pumped into the 9 5/8 II
casing and formation below the retainer. The D.P. was picked up
and un-stung from the retainer and the remaining SO sacks were
displaced from the drill pipe. The pumps were then shut down but
the drill pipe pressure remained at 900 paig. The retainer was
tagged and was found to be in place and holding. The displace-
ment mud was weighed and was found to weigh only 15.0 PP9.
Apparently before the cementing began the mud weight in tanks had
been cut from t~ original 17.1+ ppg to 15. PP9 thus creating the
unbalanced condtion. It was decided to reverse the 50 sack
slurry out and circulate and condition the mud, then spot the 50
sack slurry on top of the retainer.
,/
At 6:30 pm I spoke with John Boulware and he said that Gary Bush
had contacted Russ Douglass and it was decided not to place the
50 sack slurry on top of the retainer. The rig crew then began
laying down the drill pipe in preparation to set the next plug at
4000 ft.
~.'
. ~ -~ -,--- -- - -- - - ~- - - - - - - - -- - - - - -~'--'--"--
....
...~
Union 18 Trail R1('l -2- ( ~nu.ry 5, 1981
The rig crew P.O.B. and picked up another 9 5/88 2-1 drill and
R.I.B. v1~h sa... ~h. r.~.1ft.r wa. Bet at 3986' and a po.i~lve
shut off plug vas PU8ped in retainer and seated with 2000 pail
Pwap pre..ure. At. thi8 ti.. a 100 a:lt. 8lurry of cl... G. was
.~t~.ð on ~~ of ~h. retalner. ~h. rig crew pulled ~r.e stand,.
0-' D.P. ~o clear c...nt. and rever8ed exc... c...nt out: D.P.. Th.
erew then began la~ift9 down the D.P. in preparation to set. the
top 100 ft.. plug- I contact..d RU88 Dougla8. at. this ti.. and
reported to hta.. to ~h. progre.. being made. I a180 ..ked RU8.
if be vaD~ed .. to wltD... the top plug .etting and he said no,
80 I returned to Anchor_,e.
Sun4-1 pec~J'- ..7,.1'.0. I received ,. call thia date at, my home
frôi8 -cary i_Ì1 conCerning the 8uspen8ion of 'frail Ridge fl. I
tnfoned Gary of t.he Z'8,ulat.1on8 concerning ~. final abandomaent.
if the ..11 va. not r.-.n~.re4. I also questioned him concerning
. sq..... job t.hat wa. perforae4 .~ and .arlier date on the 9
5". ca81n9 .~ approxlutel1 8000 ft.. Apparently when t:he 9 5/a-
c.81ng va. .et. and C"'D~ed . leat va. d.~.ct.ð when the c.sing
w.. be1n, t...t.e4. W1t.b~. 0.. of an H'lS tool the leak w..
looatoed .ad . 8CJ"".. job v.. 40... When the ec¡u.... job va.
4X'il1e4 08' aa4 teat-eel. sull --unt. of fluid-l/. bbl. per
- -i_Qt.. at. 4000 pai. oou14 be pup.a. away. Ga1")' aa1d he had dis-
o....a thi8 w1_11 It... aad a d8c1810n had been .ade DOt t:o plaae .
plug at tb.~ point..
"R.,.,',-'t{,)"~~,."-"."...,,,,, .Z:1""::'A..,~IA1q" 1 f»ok,. .,,1th a..., th1. .œaiDt. OQ,~-
C8rai.-., ., ooavera.t:IOR w1t:.h Gary aDd he .aid he 4iafttt: re.eatMìr
418cn..1., the .,u.... job vi th Øar:y bu- he would COR"act h18
0080...1.., th18. '
¡
W94A..dlv De"-haJ: 10-11 1.80. I weD~ t.O Union'. 'Irai1 R14'8 .1
\il.":_t;'-..'lti..~1tPêu.lå,~ .tô'¡'J1. Callande!:, Oaton dr11118' 8UP"-
V1801", coDcern!a, a proble. with returns being received in 1:be
celler aro.." the out.id. of 'the eon.u~or pipe. 'Ibis occur.a
wh11e el18po81a, of "ater oat: of the re.8"e pit. With. pump in
r.~. of 3.5 bbl..I-1n. approa1118t:ely, 1 bbl.I.~. wa. being
l'ece1.,,84 back 1n the celler. ( I.M t" "-iA. ? IÅ 'l' t'1 «:) oc h b\.;. <.: ~ ì .:J
AfteJ: wa1t:1n9 oa ,,--at for 12 bone the well vae p\tIIPea in'to at
. rate of :I bbl../m1n. at 1475 pi., wi_It no 819ns of any r8t.urà.
for a period of 15 hour..
!fJ, «!Y_..",.~~~,..i'.ja¡.~mJ¡,~_f_1"O!.., I ~.,C..' 1.e. a ...phODe, 081,1, thh1,. ðl.3t..3.lt8~O.
\J;a.8 "at808 .ft¡r;OJ:8¡¡.Ð9 me wa.at .,8 .... rea~y to cement t . x
, 5/.. anftul.. aDd requ..~.d pe~1..1on to began 1.88d1.~.ly 4ue
to ....re fr...1ft. ooad1t.1oft8. I t:old .:J18 to proceed and call..
.~ the 00801\18108 of the job.
'-,,'
.~
a.tu"J_DøO"'.J."l~J) 1,8Q. I 1'...1..8" a oal1 frOlft Jl. "at.8on
J.äloiídÄ9~¡\ -~tiì¡t.';:n."'c_nt job had been complet;ed uaiftg 1250
aacta of ceaent. 'to fill t.he 13 3/88 x 9 5/.8 annul.. froa 4000
ft. to t.b. 8urface.
'thi. conclu4e4 -the approved 8u8penalon procedure on Union's Trail
Jl1498 11. t
It
BP,-
~ 1\1
\,
-----,----- _._- - -_._- -- -,_.,--- - - -_._- _.,-,--
f STATE OF ALASKA _£
ALASKA. tlL AND GAS CONSERVATION C\. .JlMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
t:
K
L
1
DRILLING WELL ~
COMPLETED WELL 0
OTHER 0
~
--1
;:;
þ
2 Name of Operator
UNION OIL COMPANY OF CALIFORNIA
7 Permit No
79-72
3 Address
P.O. BOX 6247, ANCHORAGE, ALASKA
99502
8 API Number
50- 283-20065
4 Location of Well
1069.58'W & 329.03'W of the N.W. cor., Sec. 9, T20N, RlOW,
S.M.
9 Unit or Lease Name
TRAIL RIDGE UNIT
10. Well Number
TRAIL RIDGE UNIT #1
11 Field and Pool
WILDCAT
5. Elevation In feet (indicate KB, OF, etc )
216.6' Above MSL
6 Lease DesIgnation and Serra I No
ADL 56870
12
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO. SUBSEQUENT REPORT OF.
(Submit In Trrpllcate)
Perforate 0 Alter Casing 0 , Perforations
Stimulate 0 Abandon 0 Stimulation
Repair Well 0 Change Plans 0 Repairs Made
Pull Tubing 0 Other 0 Pulling Tubing
(Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion)
13 Descrrbe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estImated date of starting any
proposed work, for Abandonment see 20 AAC 25105-170)
Due to a fish that was left in the hole, it has been decided to suspend operations on
Trail Ridge Unit '#1 until further evaluation.
Well T.D. 13,708'
13 3/8" csg. @ 4008' cemented to surface
9 5/8" csg. @ 12,028' cemented to + 6500'.
Plug #1 Squeezed 100 sx. cmt. below cmt. rete @ 11,895.
Plug #2 Gmt. ret @ 3900' capped with 100 sx. of cement to + 3620'.
Plug #3 9 5/8" csg. filled w/55 sx. of cmt. from 150' to bottom of cellar.
Plug #4 13 3/8" & 9 5/8" csg. annulus sqz. w/1430 sxs. cmt. from surface.
The 9 5/8" csg. was filled w/128#/cu.ft. drilling mud while placing the above plugs
and this fluid remains below, above, and between all plugs.
(Submit In Duplicate)
0 Altering Casing
0 Abandonment
0 /.-Gther
0 \ Suspension
-"--",,--,. ,.. ~
0
0
~~
In addition, a 4" x 10' abandonment marker has been installed in the surface plug with
at least 4' of marker extending above ground level. The complete well name, exact
location, and oeprator's name has been bead welded on the marker.
VERBAL APPROVAL FROM RUSS DOUGLAS 12/4/80.
RECEIVED
[f-, '
J - \..1 1 S 1980
Alaska Od & r>"ro
l:lL.., Cons, Co '",
, Al/chorage mnUsslon
12/15/80
c rtlfy that the foregoing IS true and correct to the best of my knowledge
~~ // /:J /J/ / A./ Dist. Drlg. Supt.
/".,-,/;f: L(¿¿l::U.I. aA/,',/ Title
elow for Commission use
Date
Approved by
Form 10-403
Rev 7-1-80
By Order of
COMMISSIONER the CommissIOn
Date ------------ -
Submit "Intentions" In Trrpllcate
and "Subsequent Reports" In Duplicate
.. AM#
' ' STATE Of ALASKA I"~j
ALASKI( I LAN D GAS CONSERVATION c{ 1 MISSION ' . t\
MONTHLY REPORT OF DRILLING AND WOÀKOVER OPERA T.IONS'1 ~~
L
1 Drlllingwellf]
Workover operation 0
at surface
1068.5l'S & 381.51'W of the N.E. Cor., Sec. 9,
T20N, R10W, S.M.
TRAIL RIDGE UNIT #1
10. Well No
,
~
IlIt
4'
])
2 Name of operator
7. Permit No
UNION OIL COMPANY OF CALIFORNIA
3 Address
P.O. Rox 6?47, Anrhor~ee, A1~Rk~
4 Location of Well
Q950?
79-7?
8 API Number
50- 283-20061)
9. Unit or Lease Name
#1
11 Field and Pool
t
5 Elevation In feet (indicate KB, OF, etc) \6 Lease Designation and Serial No
216.6' above MSL ADL #56870
Sec. 3, T20N, RIOW,
S.M.
For the Month of
NOVEMBER
19 80
,
'12 Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
13,708'/1,354'
Fished & recovered fish while drilling @ 12,774', with TD @ 13,708'.
Left fish in hole with top @ 12,447'. Still fishing on 12/1/80.
13 Casing or liner run and quantities of cement, results of pressur'J tests
NONE
14 Coring resume and brief description
NONE
15 Logs run and depth where run
NONE
NONE
RECEIVED
D¡~r~
- \J 1 ') }Gr!O
- C '..
Alaska Oil & G"n v 1.-
,"v Con'" C
Anchorag~ Ol17l17isSion
,16 DST data, perforating data, shows of H2S, miscellaneous data
17 I herebY:,Y that the foregoing IS true and correct to the best of my knowledge
SIGNED ~'ff~~ITLE Dist. Drlg. SUpt. DATE 12/10/80
NOT¡:4,.".{ort on this form IS required for each calendar month, regardless of the status of operations, and must be flied In' duplicate with the Alaska
all a~;Conservatlon Commission by the 15th of the succeeding month, unless otherwise directed
Form 10-404 Submit In duplicate
Rev 7-1-80
Union Oil and Gas Dlvlson: Western Region
Union 011 Company of California . I COMA#
P.O. Box 6247, Anchorage, Alaska 99502 ,- ¡ co,\\7A~
Telephone' (907) 276-7600 ~I CO.VI""--Jn,
7-1 _~;N~~
~J 2 ENG J:~ 1
I 3 n )"-::,
'-1- 4 F:NG-
- U 1 Gf=Ol - --
=r-; ~~
I STATTF'C
I STAT T~C--
-,----
-CONFER: -
l FILF:
.'u ,
unl7~n
Robert T. Anderson
November 17, 1980
.
District Land Manager
Director, Department of Minerals &
Energy Management
703 W. Northern Lights Blvd.
Anchorage, AK 99503
TRAIL RIDGE UNIT
State of Alaska
Plan of Operation for Trail
Ridge Unit #2 Well
Gentlemen:
.A
/
Reference is made to the Trail Ridge Unit Agreement, we enclosed herewith
our Plan of Operation for the Trail Ridge Unit #2 well for your review and
approval. Please indicate your approval hereof in writing.
Very truly yours,
\?~~~~
Richard J. Boyle
Landman
RJB/bde
Enclosures
cc:
Hoyle Hamilton, w/encl.
Alaska Oil & Ga~ Conservation Commission
Bruce M. Barrett, w/encl.
State Fish and Game
1>~~
. AlI.I:
+.~ ' yo¿, "/ P þ
Oq cI ./ .,.> <'l)
~ ~&O
~q¡
~~.
~~
~
Kyle Cherry, w/encl.
Dept. of Environmental Conservation
Jack Wilds, w/encl.
Div. of Land & Water Management
"
."
"
r
PLAN OF OPERATIONS
Union Oil Company of California
Trail Ridge Unit Well #2
Surface and Bottom Hole Location ADL #51669
2000'N & 800'W of the S.E. Corner of
Section 8, T19N, R8W, S.M.
Matanuska - Susitna Borough, Alaska
.4> ~t.
, ~OV ~/ Ý~/J
~4i' I,>
, q~ I~&()
~~- q,~
"'Or~ 3: ~
~e ~1Jl
~8¿
i?q
<II
.
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
X.
XI.
XII.
PLAT I
PLAT 2
NO. I
NO.2
TABLE OF CONTENTS
General Wellsite
Location Access
Location Construction
Water Supply
Method of Supply
Personnel Support
Drilling Operations
Testing Operations
Velocity Survey
Location Cleanup
Well Blowout Prevention
Attachments and Plats
Control
PLATS
Vicinity Map
Proposed Location Layout
ATTACHMENTS
Brinkerhoff Drilling Company's SPCC Plan
Union's SPCC Plan
.
^'
~
I.
GENERAL WELLSITE
The proposed surface and bottom hole location of this straight hole
is on Union - PLGD's Lease ADL #51669 (surveyed as 2000'N & 800'W of the
S.E. Corner, Section 8, T19N, R8W, S.M.).
Once location preparation is
completed and the derrick erected, a registered land surveyor will re-survey
and plat the actual well site location.
The area is located on a ridge of morainal deposits outside the Corps
of Engineers designated "Wetlands Area".
II.
LOCATION ACCESS
As soon as freeze-up occurs and the necessary contracts and permits are
approved, construction operations will be commenced to re-open the Ice Road
System used in the winter 79-80 to mobilize equipment to and for support of
Trail Ridge Unit Well #1.
(see Plat 1).
This road system is along a State designated right-of-way to approximately
Kahiltna River Unit #1 and utilizes existing road and seismograph right-of-way
the remainder of the way to Trail Ridge Unit Well #1.
A secondary Ice Road
System will depart from the existing Ice Road System at or near Twenty Mile
Creek (west of the Yentna River and proceed south along existing seismograph
lines approximately 11.5 miles to the proposed location of Trail Ridge Unit
Well #2.
All equipment and related supplies will be:
1.
Trucked over the Alaska Highway System to the Oilwell
Road juncture with Peter's Creek Road and then along
the Ice Road System to Trail Ridge Unit Well #1 or
Trail Ridge Unit Well #2.
1.
II.
LOCATION ACCESS (continued)
2.
An alternate means of support would be by aircraft into
Trail Ridge Unit Well #1 all weather Herc strip and then
trucked over the Ice Road System to Trail Ridge Unit Well
#2.
3.
Additional support would be provided by Helicopter from
the Trail Ridge Unit Well #1 Herc strip to Trail Ridge Well
Unit #2.
4.
It is also proposed to install a winter Ice Airstrip in the
Trail Ridge Unit Well #2 area to accept light aircraft.
III.
LOCATION CONSTRUCTION
Location and road construction are proposed to commence as soon as
winter freeze-up conditions allow and all necessary permits have been issued.
The surface drill site and storage area will be constructed as shown in
Plat #2.
A 350'x 400' area constitutes the actual drilling pad and support
area.
In addition a 200' x 350' area will provide storage for associated
equipment, supplies and materials.
Approximately l' - 2' of peat and moss overburden will be removed to
expose the sand and gravel foundation.
If there is an insufficient amount of
gravel to provide for a smooth location, a borrow pit will be established in
the immediate vicinity.
Foundation material and protection and rig support will be provided by
plastic sheeting and 3" x 12" board matting, plus the regular 6" rig support
mats normally utilized under heavy load~.
The reserve pit is very limited in size at this location and would be
used basically as a land fill area for disposal of essentially dry drill
cuttings.
Minimal liquid mud will be accumulated due to the use of a fluids
2.
III.
LOCATION CONSTRUCTION (continued)
processing system which will remove the majority of liquids from the mud
and cuttings so that essentially dry materials are handled and excess liquids
returned to the active mud system.
Materials removed to build the 100' x 350'
reserve pit would be stored at location site and utilized to refill and level
the area upon completion of the project.
Fuel for the rig, aircraft, and on-site support vehicles will be stored
in steel tanks or double wall lined bladder tanks laid out inside bermed areas
capable of containing 150% of storage capacity.
The interior of the bermed
area will be lined with a special non-previous heavy-duty poly-vinyl covering
of at least 10 mil thickness.
In the remote chance of spill or leakage,
containment would be positive until the fuel could be removed and disposed of
in a manner acceptable to all involved agencies.
IV.
WATER SUPPLY
A water well will be drilled at the location site to provide a sufficient
supply of water to support drilling and associated operations.
A complete
water analysis will be conducted to ensure it's acceptability for human
consumption and to ensure the quality meets the USPHS drinking water standards.
V.
METHOD OF SUPPLY
Brinkerhoff's Rig #59 currently being used to drill Trail Ridge Unit
Well #1 will be transported via ice road to this site.
It is also anticipated,
weather conditions permitting, that upon completion of this well, Rig #59 could
be returned to Anchorage or Kenai on the winter road system.
Support materials and supplies will be transported from Anchorage or
Kenai along Alaska State Highways and the Winter Road System or airlifted
to the all-weather Hercules airstrip at Trail Ridge Unit Well #1.
The
3.
V.
METHOD OF SUPPLY (continued)
materials and supplies would then be transported via the Ice Road, Helicoptor,
or Light Aircraft from one site to another.
VI.
PERSONNEL SUPPORT
Because of its close proximity, the 52-man camp currently established at
Trail Ridge Unit Well #1 will remain operational to support this well.
(See
Plan of Operations for Trail Ridge Unit Well #1, dated September 1979).
Personnel will travel from one site to another by surface transportation,
Helicoptor, or Light Aircraft.
Sufficient sanitary facilities will be provided
for on-site use.
VII.
DRILLING OPERATIONS
Drilling operations are proposed to begin on or about January 1, 1981
and are anticipated to extend through March.
A detailed Plan of Drilling
Operations is on file with the Alaska Oil & Gas Conservation Commission.
However, the drilling mud system to be utilized is a fresh water gel-polymer
system devoid of diesel or oils and contains no toxic materials that are
detrimental to the environment should accidental spillage occur.
A berm
constructed around the entire location would prevent any spillage from
contaminating surrounding marshlands or woodlands.
VIII.
TESTING OPERATIONS
This well is exploratory in nature and any required testing will be
accomplished using industry techniques and in accordance with sound engineering
practices as approved by the Alaska Oil & Gas Conservation Commission.
If commercial production of hydrocarbons is established at this wellsite,
additional plans for development and surface handling of production will be
4.
VIII.
TESTING OPERATIONS (continued)
submitted.
If this well is non-commercial, plugging and abandonment of the
wellbore will be in accordance with regulations established by the Alaska
Oil & Gas Conservation Commission.
IX.
VELOCITY SURVEY
The conducting of this velocity survey will require the drilling of
thirty shot holes. These holes will be 60 feet deep and will be loaded with
a maximum of 20 pounds of explosive. The exact location of the holes will not
be determined until the drilling pad is constructed, but will be located on its
perimeter, away from the areas with the most activity.
A Mayhew Nodwell will
be used to drill the holes, which will be spaced approximately 15 feet apart.
X.
LOCATION CLEAN-UP
In the event this well proves to be non-commercial, clean-up efforts
will begin immediately.
The reserve pit will be pumped clear of all free
liquids and injected into the well.
The retaining berm and all excess gravel
will be used to fill and level the area, and the location will be scarified to
allow for natural re-vegetation.
XI.
BLOW-OUT PREVENTION CONTROL
The rig is equipped with all standard blowout control equipment which
will be installed and tested on a routine basis for working condition and
pressure sealing capabilities as required by the Alaska Oil & Gas Conservation
Commission.
In the event that abnormal formation pressures were encountered
while drilling, the BOPE would be used to "shut-in" the well immediately and
confine the pressure within a closed system.
Union's wellsite representative
in charge has had extensive training and on-site experience in controlling and
5.
~
XI.
BLOW-OUT PREVENTION CONTROL (continued)
killing well "kicks".
His expertise and the most modern technology would be
utilized at this time to restore the well to a normal operating condition.
Union's representative would be supported by well trained drilling crews
which are required to conduct first line defense and support operational
drills on a daily basis.
Automatic and manual monitoring equipment will be
installed to detect any abnormal variation of the mud system or drilling
parameters that might indicate a change in formation lithology or fluid
content of varying pressure gradients.
A comprehensive engineering study of
the geology of the area has been conducted and parameters for a safe, efficient
operation has been programmed for this well.
6.
-y '(^' \ 1 1 �'I '\` / ( (•� {} / .\� / li,'- . "' -[ _ 1_ - _ "--• "� .,,r ,.- ' , _ ., , )i` •� �LI%T__
-,� 1"t\-�_ ' i��,1�:�"�. C�� ` . t ��. (\1Jj-1 • '�I _ ��� ► ,j.,�ti (�:• �i \E.� •114
JI • \� �� .:` � '; ..� L � \f . • _ >•, . 1 � ..-Ih a• .r •_ T, tom` _ - '�+ aV)„'t )•iJ '`. . w
-• �+• ' � _ -a. t t :. _ • Z >' \ ['a •+ l � � � ^ i ( 'r ; � ti ' . .07 .o' "r � ! � • _ • .l t . ,'.. /� "f �; J • � .
-. ' ��� _�:a ,-t c \ tl t=\ <'J • ��;'/_� _ n _ \•- rt:! „a•.- `r - _ -4 - i (\ a p '� ��') .G r �: .rel fly •G. �,.� `
t•T = 1 \ t�t„ ! ` / 1. J . r+'
`1Y a r/ a . '►� j !!� / _Cj •' .') A ._a l 7 - i • 1��.. ' '� �. • f
�+� .\ i ..►.� J < <l'Jl: `�_'.•r ll. .•..�` �.r.l I 'L�' �� .•. ��' it• � `r �•) - � �r 1� '.I . �• s �, ' l l� 1 % / -I/ �` ••� .
I `- \ � .l” 1. ! .:'' %'�. o�-_�_ ('[Irl. t . r � .-- � , /l] 1 �• =•
rr �-.. �....:. 7 � � � � ' �. � Tom.. 3 ♦ -I--�� {-�-'---♦-C-�'- ` �-.r. --- 7�'� t'''•-11 = .
�! f:_ : `' �` \ • •~ J1 • .`♦ _rq•1 `. Petcr: r;+` ':` •tt �-�\1 -t4� }~'tea 1 (- i J /' i /1. 1 + ^ `1^\ .i Y i f / �- • • . t•� _•
�' \ L: - 1 � •f'i 4'_ j_ =- lint i
c-� y .� i-•C.I./,7• � �. ` (`j •i- • -!• 1 = \,%{�f� � • �'^ _
_) �\
AZ -1 '0 -tel\ t' `• ; - ♦ \ �i :..1 rr = ,- 1 -f• �-."� i .-{ i `)/�`w_�� (a' _I .� G'r t'--
'� • • ,r �_^ .�� �\ , ,v' a- r. _ s -rJltl �•a� _,;'' i� j• (� �0• {T - V\� 1•f{ -1 '_,�% / Digi
It\�\•`7.-' T a _:1'aJ! _ w1 - `iilf'�•" j�j _` •�� (-L((ft. -`'e .. •'a -'�� : C ' \.._4_`�l �'_�q� tt Ta.i,�
�•'- - 1C� �_'_r rio' :' -r • r -1 �� :•�_' , ,'I ! .rJi1 •Qa .f ('SI:CrI.1173•
•�� �':.t`+ - �:� -•..� _ ...a�..- 1�s ����)J � •t r�r�� �-=;�, ''�';'l.•»�.�,,,C.�•J,•�'• •LfL• J ---^4e , »t.i•/�'T -r. t'ti
1�__'1"left - i�_�• 1 = •r •! VV\ '1 iii ] �F I y�i , 1�.: 1 �t-1 �� }• +J`'\ •i' _ :F•;l,�n► f -_r I�
\ -�. `1' _ ;-..�"�'� ',�, • '� \� .R- ��-1-_.r• ,
' �-/'. • i ! � ; a t, � � -, -� i �� �., . • ! ' �► • p " a � �,�� t\ •` I _ - _' / � l� ^ = I 1 f - �.Li =. t � , 'L `_ 1 • _ � ',1
y -'„i - % = (� --` _ _ - 1 _ + ti , b. , tip., lr•� � _ _ t " `..••I \ / �[� \ - �. J
N.
cm A
- «-•.a f. L =• -~ ,• ..."_-'- e: --t ''+`\q _'Yj= L't ; �l`(a•F T -Y`' ^_ 1 1111111._''/ a' :l-' •fr..i .�"f ifs _ ��/�/�/�%�n-�� !?fig•
\7� '„ ��--'\_.i' -_ --,fr ���'• �f � .7�`' � i�'l �/tom- ~ - ~``�..i✓ '~' � r ;•a `:.. ~ `L��••' � ��� - ~ V '1/;'�.� t rr-�w''av C
�a -.! 'i _/'�..�a - _ 't.=� ����j•'r 1 - •, � i� t.. vK �. 'r� ��P t�� o •ate .iii�.r �' 1rl..n �"v.� .. _ .)t,- /^ C[.r.11i�.••.
-� r .�� _ \�•-rr:•t.` 1 '\. `_�� taJ - a ��t-.ti` � ��y;� � • _F._ "�11/- .!- N'' , v+� T -► :.t�j�� � �CaJ.rt.,
�' _ 10 r•u.; Y '- II _ 1 _ _�.''� ��' - � t _ ��J ��/( ,� � �'^� }f r:')\= � Wiz::
Y/t110 ♦I �,---�_ �'. '' "• r (� t- `. h • .tri- %/ `r�a (`\_'`•f: ri
• '� hltrl l\� �' �'•� --�� ,)i/) 1! �; •'. 'r- ti•-� C -� S' - J _ �'�•^ --� a •\ / / `'A' �� ^ `�•
• �'' __ • \:'rye :I• � `�.`:_ _ y„/• IR` ==:--r� .;: A"`�-.^'�`- v��'•r '• C'- �;, '� ....- 1
�-+ l i . _ �'1 _� 'r ,1 ; -•! �,..• __ .• _j T;. •w+ �•� r .= 1� t• i % J \n �j:a.t1'• t
ch
.,•;Ito1FF "� a Seh el •iir= _ ttakr{. •�j�� .•i _ •' '. J� �Seter Ho...`Su:.hint
`+ ��% L /? _ , _ /'d � •� � L+.le:..w :, _ -�\l ��` • _ .. � f� � � C 1 ��u_•.- \/u,\� .► �li <i,.•• .+t
-•�MtY_ i!•''•f 1�aJ •� •• - �_'u,T t, _ #•t\ _T 1�RrKLf�� T `t _ �,•,) •;�
` e y -c,: a •: { �- _r+ - �' .
r�"��•Y /j �� t, `-T , yyy.� `3r •/JiertlrN 1_' Y �-sjLn
rt' • • = _S' i• I . - • / - L - -CC`L/fi.rx _,•_ ~ C `,�'.n%_ { t
J �,,�_ - •a ���� a_ 1-
' •� , i , •Y?I•i u I..fY�• S � 1 '' t- ._ � i •) /r 4•.~l +� � t _ _ i ' _ � � J •, �+„i`�� _ ...
•, 't r , ` ` �� \` I .. }-�)'^�- �} � ^- \ �Oa .� _ �•�- �J 1-.�. ' -;; � tir- r-�7 � p�,. � (Jl.f `� /� .+'• ,"t'
_ 1 } tib, � � _ . - �. � -•i • � . - - � a7 i� _• . \\ �!c . /•'� l� �\ - - ' - ► - _s -=• - -'� T •i ('' ; •� .; `c:
• •.• a _ .�. a' �. • t ,w• .. ,,,: ;-rah- as `.�o t�fV=1�� '?r x~- T� .I �y -:J. 1 • a / ra��l Ull i.tn?
.•. ^' - !-�. ♦ - - : ' r �- �,=: O g _ !. +o - - �1: 4 t1,% -tea ` -e {�' + :�•�1�
gr
vR \.• $ .�. _ rte•,°• Z PotRtr __• .r - w ? ,T - F 1 .� ! t'-.•
\'~ 1 •( _ • • . ExistingLocation Lnlae �•.} ,w _ + �, -�> '• �-{J" , •�f9_
-� - - 1 ••ice Union Tex. Pet. i1 _. ;• 1'� •Q'��,-, ..i ' 41ff(�,,
- aa� It
Kahlltna River Un
A, -
It p
•� _ �.,••t\- I r.,A`r�, i • _ .v �_, �.I ..i a I �•' • !11'1"
' ' ••.. �-"� � � � 1 ' r • •• i � r �,- _ . � - 'rt l '`L - .v _ • �rl'n J)lafY • -�•.^�,; ;" F� ; -.V 1
't ... `�: _'' .".'./'- `a .- i� .r .% f. i r � � _ '` •( -1: -- _- _- r�i ` � `••tea I� .tA1�e '•_- '' \'V' '� �}�'
L: _- , ter• - .. � ,„ .. .I '•,,, . -• > > -' - t`'� y' _ ' ^' i = _ ? •Y� -'_; !t-•) '_ 1 �°•(�•-ir C'usWell% � : i
• t J • •Gla+ _ r . • . ..lv t tia r Y _ . ♦.�1„ \` (j_
.. 1''••; .• •:s ^ ��: . / ��` = 7 �' •4� •tf''j • :n 1 _i ._ +. ,y t ^i; i _ �Ge..•` r •,, / 1J .,,-. E\
r• ' $i.atntn.t_. _ A . -�-i �•• JI _•i ,r' r+•' ....-
_ t L l`''`' .
:z z
• r. '� - _ - �j •_ ,L •Laniw ; •t •.+- t �/ • �j3 y�•-1 • .': _ \i.r'•Gme: �' 1 a \ �' `a` - f
•„_ (• ! <. 'Gir } ' jnLe -•- _ lwt1� I r• S t` 1'\'`JI �aaa i
- "�' • ♦, y ' •••• _•• 1•- a•ls �,� �• -)„`. _' 1 1' - ! `. �. -t -ti l . .\� ty Ifl t •'F/ \ \f�:•� �,•�ca•:Ce..•
.• - c _ _ • "• _ O 11 • = 1 ''L' . j • .' +.•` la 'r t,, J` _
+� .-._ • t- • ';.:.. `.+ % •`. � _ ySa•t ss- � a � � r \ •- ai` 1 _ t. +) / \.:•�`•y I' _ 1`�
• . • I% •/'/'�`• • { •sa. .' ' i r - I rtf r _ C, e t -. i ' , C' .F{ _ xN S .*,/, '1�;• !� t..`, ,\•
t7 • • . • t • _ (+.t-.. i •t” \� C+n ^ • ' ` , i
�. �_ - i• •• 4' -_ .... G i ••I`•.i t \` + a r 411 \ /.
'r♦ �._ . .! fir' - ( 11':-•;- �.ir• ^'- �} �' �� �. `- 1 \ ro f i •�.* i.i Z.,,rt..a•FI..:_
• ; t • .! �- . r __�. .• ti ! " I, �^'... - � i• � �� ' \ �---• r _1 +. t �'. �, r.' w, •� , IaS:ilN lll6[
►• '!."• �IJ.ivar.l. :. •i r •, '=�.'^�•1` _ -� _ �' t �i • _ «� , - ! •~�' f�•A } ..r- �y' i, -•a ,1. � 'C T Y S.
• i.. . i' f • t , ,t 1• w . a• ria•l rlfun.} 1 Z O
' �• �' ''' ' •• •TF�iI P T_?�('F = .r t•' • = • � � !� •_;_ \ ... , , .. �'� •i- :ti • : � �.
Lml1 1O a, - '� ,, } 1 `, 1 > \ y • • • I^- r �:! is , - a' /`` 1 \��
T J1
r, . - - aaCl�` • = t is �}•. It ; 1 /..` 1 .� /• �•J - •• .. - N+-. 11 -a !�*
%
L ♦ .Prel ' .eek - - .- 1 ♦'' • ♦ � ••f7 1;^ •�Ie1� Ii-'a`^�ilia4, �'L.=.-'a
-•�� ,,'';\ ._.�itertl- Cr•rk `�•, - - f t \ - �•' r . - - ar fr.w•.YS.'.\
\ fr �a.l ( • 1 . f Delta ► •,..« •,,._:
•� '� �_ `� �- �C�e .» litl�l•drr: r _ : , ti. -� - • r -: 1�[_) Islands ; . �ilillut�•1•
.}' ` ��• :" Propbs0d•Suifoce,Locafion - / .. a,».' ,
.f•,,•. _ - . l;,,r ..«:I.a. 'UNION = • v • �'
Tio!/WidgeUnit/Y-2 _ 4 a I,Ikr t.•t••/
Betuoa .or• i_�" X;369,368'.). 1 �L = ' a tr a•rrl/ frc♦ - \
_ ►; IJ �.t _ YL ---?A. 32,328 %• t• . t
-Mountain � • l„l. •Y is Ar..a b w 1, t
t t r X. L.
VAL
c •• .l .
� - �e r n , • ••rar •'• _ • tiECit121u� �RYJ► 1 Lr,
• (• :. Wil ••• i t v .- _ •ic ,. • •: •Ptrr16
�A,=t •• -:-
.• = Inla- ! 1 u - _ t ,r-•T••ta �- a -.. \•• ♦ILr%♦t.a.r�� l N,•
'-
~
~
i
.
I
{'
'.
I-
350'
} ~ACCESS ROAD
-
a
.0
0
N
STORAGE AREA
"
..
------ t
L~ASTE 1. ~U~N PIT
-----,
I
I
I
I
I
I
RESERVE PITt WELL LOCATION
" 1-60'-Ó~ 190' -----
100' ~ 350' X 8' I
I
CAP = 49,911 BBlS
USABLE, I
29t947 BBlS.1
( 60 % ) I
I
I o--WATER WELL
140' SOUTH
I 12' EAST QF
-----...1 WELLBORE ~
..
~-- 100' Þ!. ------- 250'------
0
0
N
.0
0
~
I
I
.0
0
N
"
PLAT #2
-I
~I
unl@)n
Alaska District
PROPOSED LOCATION LAYOUT
TRAILRIDGE UNIT #2 WELL
t ": 100'
..
( y
-
1
.
j
1
I
-.1
1
j
1
.:...J
~
1
.;1
-,
.J
1
(
'"l
,J.
1
~
,:1
,...
j
J
.J
'1
i
, .
-.
.
~
---
. .
...
~ '
, . '-
...
,
. " .
..
,
, .
"
..
""-
(-
(
SPILL PREVENTION CONTROL
AND COUNTER~EASURES
PLAN
NOBILE ROTARY DR1LLING RIG rID. 59
BRINKERHOFF DRILLING CO., INC.
ANCHORAGE, ALASKA
JULY 1977
Prepared by
CROWLEY ENVIRO~MENTAL SERVICES COR?
AL/\S KA
CES Job ~o. 70G5-A
~
-'
"1
...J
,J .
-j
J
.1
,
..J
.]
]
]
:J
:]
"'11
].-
1
~;¡
"1
,-
1
Lt
"l
!
.... S\
1
...
-/
¡
I
,
.,
-'--
[
t
..'
-t
,
j
... .
.
'>
.
. ~ .
<>
.
.
(
(
. .
INTRODUCTION
..
This Spill Prevention Control and Countermeasure (S.P.C.C.)
plan has been prepared in accordance with Title 40, Code of Federal
Regulations, Part 112, IIOi1 Pollution Prevention, Non-transportation
Related Onshore and Offshore Facilitiesll (40 CFR 112).
These regula-
tions were published in the Federal Register, December 11,1973, Volume
38, Number 237, Part II.
The plan was prepared with good engineering practices and has
the full approval of management at appropriate levels.
It is a brief
plan which addresses spill control and countermeasures that apply to the
operation of a mobile rotary drilling rig.
The plan is organized into four sections.
Section I, General
Information, addresses the first three paragraphs of Article 112.7,
"Guidelines for the preparation and implementation of a Spill Prevention
Contra 1 and Countermeasures P1 an. II See Atta.chment A, Sect; on I for a
copy of 40 CFR 112 including Article 112.7.
Section I also contains a
description of the mobile rotary drilling rig.
Section II, Design and Operating Information, addresses addi-
tional paragraphs of Article 112.7.
Only those paragraphs which are
applicable to the.operation of a mobile rotary drilling rig are cited
and discussed.
Subjects covered include positioning of equipment, drain-
age control, blowout prevention asse~blies, inspections and records,
security, training and spill prevention procedures.
...
¡
.1
J , ,
... '
i
.
.,
~
.J
.....
I
1
"1
..J
~J
j
.
J
]
(
"
1
.J
]
1
<.
]
--
,
i
...,
~
_ì
-,
.
. \
-
-c
~
. --
c-
(
Section III, Programmed Improvement Actions, discusses proce-
dures and equipment which require improvement in order to comply with the
intent of 40 CPR 112.
E~gineering Gesi~~ cc~sider~tions are presented
to facilitate rapid design and construc:ion of reco~~ended improvements.
Section IV, Approval and Certification, contains required
approval of the plan by management and certification by a registered
englneer.
"'"-
...A
-
!
,
,
.
I
.
.1/
1
..
¡
1
,
2
j
ï
,
.
....
OJ
J
"
\..
.
I
.
..
, ~
.' --..
(-
(
~ f
TABLE OF COrnENTS
ParJe
-
SECTIO~I I. GENER~L INFOR~1ATION . . . . . . . . . . . . . . . . . .
1
SECTIO~ II. DESIGN AND OPERATING INFOR~'lATION . . . . . . . . . . .
Equipment Position 112.7(6)(i)
12
12
. . . . . . . . . . . . . . . .
Drainage Control 112.7(6)(ii) . . . . . . . . . . . . . . . .. 13
Well Control Assembly 112.7(6)(iii) . . . . . . . . . . . . . .
13
Fuel Tanks and Piping. . . . . . . . . . . . . . . . . . . . . 21
Inspections and Records 112.7(8)
. . . . . . . . . . . . . .. 23
Security 112.7(9) . . . . . . . . . . . . . . . . . . . . . .. 24
Personnel, Training and Spill Prevention Procedures 112.7(10). 25
Spill Contingency Plan. . . . . . . . . . . . . . . . . . .. 26
Spill Report Form. . . . . . . . . . . . . . . . . . .. 27
Notification of Government Agencies. . . . . . . . . .. 28
Oil Spill Cleanup Contractors. . . . . . . . . . . . .. 29
SECTION III.
PROGRAMMED IMPROVEMENT ACTIONS. . . . . . . . . . . .
34
SECTION IV. APPROVAL AND CERTIFICATION. . . . . . . . . . . . . .
35
1
,..
~
(
",
J
-,
,J
1
,.-4
~
1
. õ
.~
~
,
t
- f
(
\
.....
(
(
SECïION I
GENERAL INFORMATION
This S.P.C.C. plan has been written for the operation of a
mobile rotary drilling rig.
The rig is a composite of components manu-
factured by various firms.
It is designed to be disassembled and trans-
ported to remote drilling locations.
The complete rig layout includes
seventeen modular units in addition to the drilling rig itself.
each.
The rig is powered by three diesel engines at 2,000 horsepower
Drilling operations may extend to 18,000 feet with a maximum load
of 1,600,000 pounds.
The rig is owned and operated by:
Brinkerhoff Drilling Co., Inc.
P. O. Box 3008
Anchorage, Alaska 99501
Telephone:
(907) 344-2555
Article 112.7 of 40 CFR 112 is entitled "Guidelines for the
preparation and implementation of a Spill Prevention Control and Counter-
measure (S.P.C.C.) Plan.1I That article specifies a certain sequence for
writing S.P.C.C. plans.
This section includes the first three items as
specified by Article 112.7, Paragraphs (a), (b), and (c).
(--
(
\
]
.,
«
r,
/
,
~
"
l12.7(a)
Nobile rotary drilling rig #59 has not experienced
]
any spi 11 events \'/ithin the t\'lelve months of the
effective dâte of this olan.
.
]
J
J
l12.7(b) At the present drilling location, rig #59 will be
drilling into an established natural gas formation.
Due to the fact that drilling information has already
1
s
been gathered by previous operations, i~ is very
unli.kely that oil deposits will be encountered.
The only conceivable type of spill, therefore, would
]
~
\
J
be from the diesel storage tanks described in
Section II.
If the total contents of the tanks
(524 bbls) were lost, the entire spill could be
contained in the facility catchment basin.
-:J
]
_tl
l12.7(c) As described in Section II, the present drilling
location has a catchment basin (9,000 bbl capacity)
"1
~
which can be used to contain oil spills.
1
-~
1
.....
..,
J
.1
~
'1
....J
-
I
\
....
.....
]
""-
1
.--- -- - --
-, -'. '~C"'-.,""~~.' ---. ..~.-..,
,,~._-_:.",. . ,'" .--~-
~- .,,- ~
,
!
:
I
.,
:
'r
.,
!
-1
j
'1
J
'~
J
'..
j
.J
1
I
&.'
,
'1
I
j
.,
1
ì
..1
-1
j
d
1
.J
1
,1
!
.
¡
~
-.,
.,
'\
'--
-I
.
-
'1
(
(
.
.
('
..
SECTIO~~ II
DESIGì AnD OPERATING INFORHL\TION
This S.P.C.C. plan specifically addresses the opêration of a
mobi1e drilling rig.
The Code of Federal R9gulacioos, Part 112.7(6)(i),
(ii), and (iii) addresses this type of activity.
112.7(6)(i)
"t-1obi 1 e dri 11 i ng or I¡Jorkover equi pment shoul d
be positioned or located so as to prêvent
spilled oil from reaching navigable \'Jaters."
The placement of a mobile drilling rig is dependent on the
location at which the leaseholder or contractor requests the drilling
to take place.
Brinkerhoff Drilling Co. operates Rig #59, but does not
have control over the positioning of equipment other than layout of
equipment and orientation of the rlg.
At each drilling location, the
equipment is positioned so as to prevent spilled oil from reaching
navigable waters if practic~ble.
'¡:1e present 1 oca ti on of Ri g #59 is 804 south, 675 \'/es t, north-
e~st corner of Section 18 T4 North, Rll West S.M.
This location is a
gravel pad encompassing approximately 60,000 square feet, which is
situated in a wetland area 16 miles south of Kenai, Alaska.
Access to
the drill site is by gravel road.
Rig #59 has been positioned as far as possible from the edges
of th~ gravel pad.
,,-
--- -- -
l
-_:
-~ '\
...
-
1
.
-
.....
\
.J
1
1
J
--.
~
"
...J
]
1
.J
]
(
'-
-I
.J
]
J
l
.~
J
-,
j
-
1
t
,j
-,
~
-.,
.
I
j
-1
,
.
,
.
(
I
I
\
" ,
~
, ..
~
112.7(6)(ii)
IIDepending on the location, catchment basins
or diversion structures may be necessary to
interce~t and cont3in spills of fuel, crude
oil, or oily drilling fluids./I
At the present drilling location referenced in the previous sec-
tion, the leaseholders have constructed a catchment basin which may be
used to intercept and contain oil spills.
The capacity of the catchment
basin exceeds 9,000 barrels.
This capacity is far in excess of the 524
barrel fuel storage capacity at the rig.
112.7(6)(iii)
"Before drilling below any casing string or
during workover operations, a blowout preven-
tion (BOP) assembly and well control system
should be installed that is capable of con-
trolling any well head pressure that is
expected to be encountered while that BOP
assembly is on the well.
Casing and BOP
installations should be in ~ct~rdance with
State regulatory agency requirel:.ents.1I
The rig is equipped with standard blowout control equipment
which is tested on a routine basis for working condition and pressure
sealing capabilities as required by the Department of Natural Resources,
Division of Oil and Gas.
-.
(-
,
(
\
Fuel Tanks and Piping
....
The drilling rig and all ancillary equipíi1~nt are fueled by t'..:o
st~91 storage t~nks with è total capacity of 52~ b~rr=is.
Tank nu~ber one is rectangular in shape (8.33 ft. x 35 ft. x
-
7.68 ft.) and is skid-mounted to facilitate transportation.
The tank has
,
,..
positive shut-off at each outlet.
.J
Tank number two is round, solid-steel welded construction
-
i
I
,
-
(8 ft. x 14 ft.) and is mounted on top of tank number one with positive
shut-off valves at each outlet.
-J
.oA
I
~
,
j
-
Both tanks are usually visually monitored several times daily.
Fuel volumes and any significant fuel problems or shortages are normally
~
¡
~
recorded on the lADC Driller's Log Book which is certified by the
--,
,
¡
Toolpusher's signature daily.
.....
t
1
.
.....1
All piping between the storage tanks and various pieces of
equipment such as boile,'s, generators, engines, etc., is suspended in
-l
.
..
above-ground piping trays with steel plate walls.
The piping trays or
l
lIutilidors" are protected from damage by vehicles and serve as walkways
-",
for the drilling crews.
The top of the utilidors are open for access
J
I
¡
--
to connections and-are used for regular inspections.
-.
,
./
"'-.
l
I
:
.-
During fueling operations, the designated person responsible
for the prevention of oil spills will delegate one worker to the task of
.
~(
.
~.
.c
-.
j
i
.
-,
.
!
"-
.
-,
..
--
f
¡
"
\
"
,
(,
¡
(
.
.,
~
,
~6nito¡ing the fuel storage tanks as they are being filled to prevent
,overfill.
An alternate method of preventing the overfilling is to pro-
vlce 3 pJsiti\e ~isible ~eans of deter~ining the fuel level in the storag2
tanks.
Before any tank filling operation begins, the worker will check
all outlet and drain valves to be sure that they are closed and have
available hand tools to construct containment barriers in the event of a
spill.
'-""........- ~.
, . '
"
, ,,- -'. -,< -~"",-""'m -~ - """'~- ~
." " ,-.
" "'0,- ,.- '.~ ," ,..
(
. '--
. . ~
:.
,
:J
t'
. \,
.
..
..
.
-
-
~..
J
{
~
j
'-.
" 1
'\
.8
j
,..¿
~1
/..
-'1
J
"
,."
~.
#.1
l'
';¡
~
,
.
"
"
"
(
112.7(8)
"
\
Inspections and Records
Tan~s are vis~a11y monitored several times daily.
Fuel 'Jolu:ï1es
and any significàn~ fuel problems or sn~(~ag~s a;~ ~c(~a:ly recorded on the
I.A.D.C. Driller's Log Book which is cer:ified by the Toolpusher's signa~ure
daily.
Shift inspections are conducted by each shift supervisor to detect
leakage, damage, or serious deterioration of the storage tanks, fuel lines,
piping, and associated apparatus.
-.
------- ----- ----
- -~~'~~$_~~:r"c:>~'~-- .~.
~ .-
'.- ^-;"-.- - :.~';-- ,,- '" ."~,..",- ~ "
-<.,::- ..' _.; .-. . ../"-
.. """"", '
, - ;- ~_':.. .' .'., d ." ,- -- ~.., ,
;:;.,- -
~
...
-f'-
'-
.....
of
.....
I
..A
-
-
,
¡
....;¡
-
,
f
...i
"oj
..
.;
.-
!
\',
-:::¡
-t
.....
1
i
.....
-1
.1
.:.oJ
-:'I
.1
J
j
]
"
.
..
"
.4'
-c
~ .Ä
'" ---1
.. .J
;.
1
.: 1
(
(:--
'-
¡(
I"
.'
..
\ "
,
112.7(9)
Security
The o~eratio~ of a mobiìe dîilling rlg does not involve any
storage tanks or plplng which is left unattended for extended periods of
time.
For this reason, security procedures are not required.
\.lhen the
rig is temporarily shut down, however, pull plugs are screwed into all
storage tank outlet valves to prevent drips or accidental opening.
-..
.tI
.... "
(- ,
\. .
...
...
.if
~
...
....
....
--
,-
.
1
..
(
D
II
.
..
..
..
.l-
..
(-
(
"
'"
112.7(10)
Personnel, Training and Spill Prevention Procedures
8rinke:~hof~ Crilling Co. con~ucts onçol~g training prograQs by
supervisors and experie~c~d empìoyees.
The training sessions incluåe the
opera~ion and maintenance of equipment to prevent oil discharges and
applica~le pollution control laws, rules and regulations.
The designated person accountable for oil spill prevention in
connection with rig #59 is:
Bob Baker, Rig Supervisor
or
Jerome Dodge, Assistant Rig Supervisor
"
.'
'-
- (
I'
.-
~ \.
\.
(
. 11. .?pil1 Contingency Plan
.....
..
--
icmediately:
...
...
.
....
....
..
'"
J
t
..
....
!
~
..
.a
.II
!
1
..
~
l
--
~f
I
(
I n the 9'/en: tha t an 0 il s oi 11 occurs, take the fo 11 mil n;j e.cti c~
1.
Take care of any injured first.
2.
Stop leak, if possible.
3.
Get rig into position to shut down if required.
4.
Use all available equipment such as shovels, picks, rakes,
sacks of drilling mud, etc. to divert flow of oil into mud
pi t.
5.
Report spill information to Brinkerhoff Drilling Company
(see Spill Report Form).
6.
Requisition additional manpower and equipment if required
(see cleanup contractor listing).
7.
Keep notes of events (date, time, action taken).
8.
When the spill source has been stopped and the flow oil
contained, use pumps to transfer oil into tank trucks for
treatment or disposal.
Front end loaders or other mechanical
equipment can also be used to load oily åebris into trucks
for disposal.
(-
(-
..
"
t
~
.....
, \.
'\
\ -
SPILL REPORT FORM
\
RIG #59
..
BRIr:K::?-HJFF DRILLI~~G CO.
(907) 344-2555
R .. ..h .c: 1, . . ~ .... . . -I'.. 1
\eporL l. e 10 lo':nng inrOrmal.ìOn Hï;re~lal..e y:
...
1. Your name
,..
2. Your job title
-
3. Location of spill
..
4. Type of product spilled
aI
5.
Spill size
-(
Area contaminated
...
Volume of spill
-, .
I
.
..
leak rate
6.
Spill source
(storage tanks, piping, tank trucks, well, etc.)
..
~
7.
Injuries (if any)
..
8.
Areas which may be affected
(lakes, rivers, streams, marshlands, etc.)
..
9.
Spill cleanup equipment required
..
(booms, skimmers, pumps, heavy equ~pment, boots, etc.)
l
..
'"-
.~
-,
~
.
- .
.
...
...
...
...
-
..
~
.....
.....
..
.A
(
"
-
......
-
..
,..
,..
~
~
~
I
,
,
ÌiI
..
....
(
(
,..
\
. ~
~
. ' ,
\.
NOTIFICATION OF GOVER~MENT AGENCIES
u.s. Coast Guarc:
632 ~est 6th Avenue
Anchorage, Alaska
(90ì) 2E5-5371 (24-hour)
Environ~ental Protection Agency
Anchorage, Alaska
(907) 265-4881
(907) 272-8812 (night)
Alaska Department of Environmental Conservation
Juneau
(907) 465-2600
(907) 465-2601
(907) 465-2602
(907) 274-5527
(907) 688-2388
(907) 337-3189
(907) 452-1714
(907) 452-1715
(907) 456-4861
(907) 488-2834
(907) 835-4698
(907) 835-4544
(907) 835-4240
(907) 835-2634
Anchorage
Fa i rban ks
Valdez
J
. .... .. ~
,
,
(
¡# , I.
~
...
\
I
\
~
"
0 I L SP I LL CLEA~¡UP CONTRACTORS
"""
Crowlev Enviro~~~r~~l Servic~s Cera.
v .
AnchofJge, Alêska
Alèn Allen, Gen=ral M~nager
2t-hcur Oil Pollution Control Services
"""
Agents:
Ho~er
Harold Hussey
-,
Juneau
Jim Hilcox
.
..'
,"",'
!
¡
~
Kodiak
Ed ~Jaughton
, -1
"
;¡
S e\.¡a rd
Cliff Center
r ~.
T
(
........
j
J
r
,
,-
1
j
J
"
;
4
,
~!
,
.
I
"-
: I'
¡
i
~:
,
"
. \
r
!
. .,
-- - --- -
---------
."J'""""_"",',-"""~J_","'-'""""",-"",-"""=,~-"""","-,,,,,-, ,~
(907) 344-1511
(907) 276-6611
(907) 235-8367
(907) 586-2637
(907) 486-3846
(907) 224-5278
.
....
(--
(
) ,
"
4.
' .
" ,
\ ,
\ ~
~ ~ I
(
~, ,r
~ '
(
,( -
,
31'
.,
:'~
" ~
"'-
.
-
¿
SECTION IV
t
APPROVAL AND CERTIFICATIO~
Management Approvaì
This S.?C.C. Plan will be iroplementej as herein described.
Signa ture ~:--., (t..é_-[ -- ~ '-----, ,.J~,_:. .^-"
¡T
/1 ') ~ )""- \ ~~- r ì ¡ r
Name /~^' I, ,--tV K \,::- ~"?- I~ é r ,- i / D.. ì -. L. i ,...; '-...,
Title
L)í~ J it / /IJ ('.
.. --
,\~jf")!f
" ¡
/) ./'
\..... '- '
/' /1/ C
Cer'ti fi cat; on
I hereby certify that I have examined the facility, and being
familiar with the provisions of 40 CFR, Part 112, attest that this S.P.C.C.
Plan has been prepared in accordance with good engineering practices.
~~~~~~~~";\
~~t: 0;- 4( "~l1"\
b~~ ~:l38S~~.OOø. Ç1(J.".' ;¡~;'\
r..:l' "'v .° &\.,)Q ).J"'" ~ '\
V ':> C'O" .,..... ~ '.7 ;):1 "",=",j .J!1
[;1~.. ," a,);/ ~J1
I:) Z'~ ~'-_:!, ":' -. 1 - - ") .:.. v<,)
r)-- .J". '-'if.
:~ ~r ;/~;-.. -~-"/Y :?¡t;~~"' ,:1
l-:; jv-~'- C¿,..Li. "~
~:'--'¡)J'--:;-;J"'-:""-~~-:~ 1
(Sea 1 ) / '/,-¡-~, jc--~:~ :,'):, -/ ti.:j
:/",Ç",")" 1'.""" ,,---'c .}~'I".,J
V --.. v\ ¡ .,...J.",JIJ-- ..."::-';;:."-.
, " '. ", > ',""~-
J\" ,':, --- ~. ~-~~
\,'""" .- ~'.;I
.' -'...".)-')~",\-,,-
" .'v ~ '- - . ,\ ~."" .~
'.:',\ I tJ -.: ~ ~ ì \... ,,:.-,
""¡'\'~""""""'.f..~~
"'-'..r""~-
-"".........-~....~
Date Jo..- <.J;:
...-. .
¿ (>/ I 7" 7 Î
--
J 4 ',¡\ E.::; III- '- EN
Printed Name of Registered Professiona1
Engineer
QéL~", ^ at¿...
Si~~ture of Registered Professional
(7i'n ee r
Registration No. 33 J 7 - E-
State /11-../), ;5k I?
..
('
"-
...
I'
10
..
....
...
'JA
(
"-
-
-
.....
w
2I'~
a'
»
..'
l'
~
:s
'2t
,
\
\,
.
,
\
( .
. \
,
.
(
SECTION III
PROGRAf'~~1ED I t.1PRO'lEj'1ENT ACT I œ~s
The Federal Code of Regulations states in Part 112.7(2)(ii):
ItAll bulk storage tank installations should be constructed
so that a secondary means of containment is provided for
the entire contents of the largest single tank plus suf-
ficient freeboard to allO\'l for precipitation."
It is understood that the responsibility for drilling site pre-
paration lies with the leaseholder.
It is recommended that Brinkerhoff
Drilling Co. request the leaseholder to construct a berm or trench around
the fuel storage area which will divert any spills that may occur into
the mud pit.
It is also recommended that any lube oil or product drums
be stored within the bermed or trenched area.
The rig superintendent is responsible for checking the bermed
area daily to assure that any spilled fuel will be divertt~ to the catch-
rr:ent basin.
- .' -_.- . --
. 'w..'::-. _":.-
- , , -'
, .
, - ,- ,
. .", .'. ".~'.' "",.~~.-~'.-,. .'_. >""-'"
..~.,...""!'-""'~'
.,. .,'., "
-
~ )
61.61 tp..1u¡,¿
Imd K)hIDNI.U~OJ ~~O1J11TIOd
DI'd.LS1Œ V)IS'VTt/
\t1~mO:I11VJ dO Th"Vd1'~OJ 110 NO1W1
:~
-
)
-./
. ->
~,'. -
Y'; ,:."
" ','-
\
\
\
'"
I )
I -)
('
1
(
-'
(
TABLE OF COXIE'ITS
Policy StateJnent . . . . . . . . . . . . . . . . . . . . . . . . .
1
Oil Spill Contingency Plan, Cook Inlet, Alaska. . . . . . . . . .
2
Education. . . . . . . . . . . . . . . . . . . . . . . . . .
Public Relations. . . . . . . . . . . . . . . . . . . . . . .
3
4
Handling of an Oil Spill. . . . . . . . . . . . . . . . .
5 - 6
Definition of an Oil Spill. . . . . . . . . . . . . . . . . .
7
8
Organizational Chart. . . . . . . . . . . . . . . . . . . . . . .
Reporting Procedures. . . . . . . . . . . . . . . . . . . . . 9 - 10
Duties and Respo~ibilities
. . . . . . . . . . . . . . . . .11 - 12
:Map of Cook Inlet. . . . . . . . . . . . . . . . . . . . . . . . 13
'-
Pollution Control ~1ateria1s on Hand Within Oil Industry. . . 14 - 18
Equipment Available Through C.I.R.O. . . . . . . . . . . . . . . . 19
Pollution Control ~mterials Commercially Available. . . . . .20 - 21
Contractors and Equipment Available. . . . . . . . . . . . .22 - 23
Commi tment of ~fanpower . . . . . . . . . . . . . . . . . . . . . .
24
25
Marine Equipment Available. . . . . . . . . . . . . . . . . . . .
Air TræL~portation Capabilities
. . . . . . . . . . . . . . .26 - 27
Radio Equ: ;>ment List. . . . . . . . . . . . . . . . . . . . . 28 - 30
Directory - Outside Industry. . . . . . . . . . . . . . . . . . .
31
32
Air Pollution. . . . . . . . . . . . . . . . . . . . . . . . . .
Report of Changes. . . . . . . . . . . . . . . . . . . . . . . .
33
Distribution of Oil Spill Contingency Plan Books. . . . . . . 34 - 36
\
(
(
.°
I
"--
"
\ \
\
(
c
PUBLIC REL.t\TIO~~S
Union Oil Cænpany recognizes an obligation to disclose info~~tion
concerning its stffivardship and the advantages of utilizing the release
of infomatìon to t:.1.e public of theil"' perfonna.."'lce..
Reports on an emergency should focus on the follmring facts after
pTop~r clearance:
r.ranager ..
Time of occurrence.
1.
2..
3.
Location.
General nature of the incident.
4.
General description of ~le company facilities involved.
s.
6.
Type of product spilled.
Extent of spill.
T/c;!:::. I l.A..', dO , £TC-,
~TIeß~er spill has been controlled.
7.
8.
9.
Clean up measures being taken and planned.
Presence or absence of injuries.
10.
Special efforts being taken to protect property and'vildlife.
IX) NOT make statements regarding:
1.
2.
Liability for spill.
Speculation on cause of spill.
3.
Dollar estimate of damage.
4.
Estimates of how long it will take to clean up spill.
s.
Promises that property, ecology or anything else will be restored
to normal.
6..
Names of_persons injured, missing or killed.
All press releases must be approved by the Alaska District Operations
4
-~'. -
-~
(
I
I -
\
.'
\
'-
,-
f
(
(
< '
It is the Policy of Union Oil Company concerning environmental
mattcrs to vigorously support conserva~ion of na~uTal resources
in all of our oDerations.
..
The Company will design, construct and conduct operations in
.-
strict compliance ,~ith all Local, State and Federal laws govern-
Lng such activity, including pollution control.
Every operation
will be programmed to prevent pollution.
However, should
accidental contamination occur, tile Company will control and
report such an occurrence in cooperation with the appropriate
authority.
./
Ala ska District
1
,
I
\
\,
l
~
I
\
(
. "
"
<
Union Oil CoIJpany sh:1ll make every reasonable effort to prevent,
0
contain and clean up oil spills and shall cooperate \'ri th others toward
such ends.
Union Oil Cc:rpa..'1.y 'viII retai.Tl th~ respollsibili ty ~~d authority for
direction of clean up opeTations of s?ills occurrLTlg from facilities ¡¡e
operate.
Responsibility for clean up operations.
The United States Coast Guard Contingency Plan envisions
that the person responsible for the discharge of oil into
or upon navigable 'vaters \'åll take action for containment
and clean up.
Such acti vi ties will be evalua ted by an
Agency of the Federal Government.
If such clean up opera-
tions are inadequate, the Agency ,viII direct clean up
operations, but the person responsible will be liable
for suc.~ cos ts .
If ~le origin of a spill cannot be de-
termined, the Agency is responsible for the clean up
operations and the resultant cost.
Liability for damages.
The potential liability for d~1'~ges resulting from an oil
spill is extremely large.
Liability m....y be incurre¿ tl110Ugh
ownership of the facility from which the ~I)ill occurred or
by inadequate clean up operations.
In vimv of the potential
for large damage suits, it is imperative that Union Oil
Company does not enter into clean up operations of spills
of other operators or tllOse of unidentified origin unless
and until tile person responsible (a) requests assistance in
or the lUldertaking of the clean up operation, (b) guarantees
all cost, and (c) retains direction of the clean up operations.
2
------------- -- ---- --
"
- -, -
(
(
EDUCATIOl-l
(
All employees 'viII be indoctrDlated and trained in the prevention
of pollution, le;al requiT~~ents, surveillar£c ~~d noti~icatiQn of
au~lorities and cle~~ up procedures.
Special pollution abate~ent
instruction, bulletins, fu'1.d personal consultations ,viII be utilized
to ensure that operations conform to this policy.
The CoDpany will cause all Contractors and Sub-contractors to
realize the responsiblity and importance of antipollution efforts.
The Company 'viII ask the Contractors to submit to us a copy of their
Policy on Pollution Control for field operations.
(
'-
3
, ,
(
(
HA~DLING OF ~~ OIL SPILL
c
Discovery, Notification and Action.
Union Oil Company charges each employee or Contract employee '-lith
a share of f¡'1e responsibility in the immediate reporting of any
spill observed. He should notify a Foreman, Superintendent or
Supervisor of the facility.
If suCh a person cannot be reaChed,
it is imperative that the Alaska District ~fumager of Operations,
Alaska District Production Superintendent or the District Fire &
Safety Supervisor be contacted as quickly as possible.
The Alaska
District Operations ~funager is responsible for immediately notifying
the proper Government Agencies.
Cook Inlet Pollution Incident Reporting Procedure.
(
1.
Federal Law requires that initial notification be made to the
Coast Guard.
From 8: 00 Ai"! to 4: 30 PM Monday through Friday
call Zenith 5555 or:
Commanding Officer
Marine Inspection-Captain of the Port
P. O. Box 1286
Anchorage, Alaska 99510
Phone:
271-5137
2.
To contact Marine Inspection - Captain of the Port from 4:30 PM
to 8: 00 NYl 3Ild on 'veekends or holidays, call:
FAA Duty Officer-Alaska Region
701 C Street
P.o. Box 14
Anchorage, Alaska 99513
Please be sure and confinn that the FAA Duty Officer has been able
Phone:
or
272-8812
271-5936
to pass your report to the Coast Guard.
If contact ClliïnOt be made within fifteen (15) minutes by use of
3.
"
the above numbers, call the follrnving immediately:
F ~ D lit ""~ \..: D, ~ \.. 0 fl£. ~ "'~1 L \I ~ <. - D. ~"f. 0 ~ C" L. ....
- ..,. »
"'"-
5
;?". Eo N "". H
s-s-s-s- .
( -
(
(
(
Commander
17th Coast Guard District
FPO Seattle, Washington 98771
Phone: 586-7340
(Juneau Duty Officer)
4.
The State of Alaska Department of Environmental Conservation
requires a verbal report 'vi thin 24 hOUTS, Zenith 9300, or
Ancl1orage 274-5527, or Soldotna 262-5210, or Alaska D~paT~ent
of Enviro~~ental Conservation (TI~ 090-25-421) to be followeà
by a copy of the written report.
5.
The Federal Environmental Protection Agency requires a verbal
,
report in AnChorage 271-5083.
6.
The State of Alaska Oil & Gas Conservation regulations require
~lat all accidental loss of oil or gas be reported to the Division
of Oil & Gas.
In all such reports of fires, breaks, leaks, escapes
or other accidents of this nature, the 'location shall be given by
section, township, range and property so that the exact location
can be readily located on the ground.
The Coast Guard will make
the initial report to the Division of Oil & Gas, but the Company
will follow \~i ~1 a written report and 'viII specify what steps have
been taken to remedy the situation and give details of the loss.
The written report will be r:lailed to the State of Alaska, Oil &
Gas Conservation Committe-e, 3001 Porcupine Drive, Anchorage, Alaska
99501.
7.
The Alaska District ~.IanageT of Operations ,.¡ill report by phone
to the \~estern Region Manager of Operations at (213) 482-7600.
8.
TIle Western Region ~fanager of Operations \vill make the necessary
Home Office contacts to assure proper executive alerting and
public relations.
- -' -
'- '
6
'"-(
"'
c
(
\~
, '
( \
A minor oil spill is defined as an oil discllarge of less tllan 1000
. gé:llons in inland ,.¡aters, or less than 10,000 gallons in coastal ,'raters
or a discharge of any material in a quantity that does not pose a threat
to the public health or \.¡elfare.
A moderate oil spill is defined as a discharge 0: oil of 1000 to
10,000 gallons in the inland ,vaters or 10,000 gallons to 100,000 gallons
in coastal \vaters, or a discharge of any quantity of any material that
poses a threat to the public health or 've1fare.
A major oil spill is defined as a discharge of oil of more tilan 10,000
gallons in inland \vaters or more tllan 100,000 gallons in coastal waters
or a discharge of any quantity of material or substance that substantially
threatens the public health or welfare, or generates wide public interest.
The Operational Facilities involved are the offshore drilling and
production platforms designated "Grayling", "~Ionopod", and "Granite Point".
The onshore facilities designated "Kenai Gas Field" and "Granite Point
Onshore".
TIlese facilities are shmVI1 on the map on Page 13.
Potential
sources of an accidental spill associated \vi th these facilities are as
follows:
1.
2.
Blowouts of drilling or workover wells.
Rupture of manifolds, flowbeans, separators or surge tanks.
3.
4.
Service boat transfer ope~at~~ns.
Submarine pipeline failure.
s.
Failure of onshore-offshore treating or storage facilities.
Properties of potential pollutants are as fo110\vs:
1.
Gravity of the crude oil \vill range from 28° to 38° API at 60°F.
In a situation whi~l requires cleanup operations, the Alaska District
Operations ?--!anager \vill coordinate these activities through the Cleanup
Operations Supervisor.
The organization to implement a cleanup operation
is shmm in the Organizational Chart on Page 8.
7
------ - - --- - - - --- -- - ----'---
'---,
--- -----
-,;.~:':.. ,'-
, - "- -- .-
----- -- --- --
,- c-. -~: r -, '" ,---~-.,.' "._'" -'. ".w. ~
..-",-,-,-,...';.i,""""""
I '..-
" "', .. .' -
..
(
.
. (
(
Cleanup Operations
Supervisor
Bob Culver
Offshore Cleanup Foremen
N. Birchfield
B. Brm."er 1'1. Call
C. White E. Kendall
J. Brummet
Onshore Cleanup ForeMan
Eob Smi th
Techniques & Haterial
Evaluator
Dob Culver
Cleanup ProcureMent
Officer
. -
Roger Dornbrotiski
"L
Labor Recruiter
Jim Sh~.,
~
Buyer
Harold Piland
--.
AL.\SKA DIsTRrcr
Operations Hanager
E. F. Griffin
:
~
Cleanup Coordinator
JiTJ Anderson
~
~
- - -- - . - --- -~-
8
(
Public Relations Officer
Dave CT<:t.;ford
Gove~ental Technical
Liaison Officer
Cal û\.¡ens
Wildlife Officer
Gary Padley
Legal Advisor
Bob Þ,nderson
Clair:1s Adjuster
Dick Howe
'.
Communications
Facilities Officer
Fred Duth,...eiler
Transportation OtJ 'cer
Steve \lfiesd
"lell Control Supervisor
Jim Callender
----
Well Site Drilling
I:n~inœr
JOJUl t:aJcrhill
"lell Site Dri 11 lnt!
Foreman -
Larry HcAllistcr
- -------- ------_.
t -<""'. '
r ... -
( (
JNION OIL COMPJ\¡W OF CALIFORi'iIA
, .
Crude Oil or Product Spill Report Form
I
"
Division
, Facility
Location of Spill
District
Estimated tiœe of spill:
Time
~1onth
Day
Esti~ted voltIme
Product spilled
We=:.~er
Cause of spill
Names of other parties involved:
Description of spill area
1
2
Containment procedures
Immediate Supervisor called:
Name
Year
(
FOR OFFICE USE O~LY
*************************************************************************************
Notification of Regulatory Agencies:
A. Agency: Time: Date: Person:
Remarks:
B. Agency: Time: Date: Person:
Remarks:
C. Agency: Time: Date: Person:
Remarks:
D. Agency: Time: Date: Person:
Remarks
-
If Union Oil Corporate Office notified:
Date
Name
',--
Signed :
--
9
Time
,
c'
(
,
(
(
\ .
REPORT OF ENVIRONMENTAL VIOLATION
1. DATE SUBMITTED:
2. REGION:
3. DATE & LOCATION OF INCIDENT:
OISiRICT:
4. DESCRIPTION OF INCIDENT:
5. CLEAN-UP OR CONTROL ACTION:
..
6. IDENTIFY THE LAW, REGULATION, RULE OR PERMIT INVOLVED:
7. NAME OF FEDERAL, STATE & LOCAL AGENCIES NOTIFIED:
-8. RESPONSE OR SUBSEQUENT ACTION BY ANY GOVERNMENT AGENCY:
9. FINES, PENALTIES OR D~MAGES:
ASSESSED BY GOVERNMENT AGENCY: $
ESTIr~TED LIABILITY FOR PENALTIES OR DAMAGES: $
C'
c
(
(
, '
G.l\LLO:~S OF OIL
!,ER SQUARE }.ITLE
25
Barely visible under most
favorable light conditions.
. STA1\11\RD TEIDi
APPEARL~\CE
"Barely Visible"
"Silvery"
50
Visible as a silverI sheen
on th~ water surface.
"Slightly Colored"
100
First trace of color W2V
,
be observed.
"Brightly Colored11
200
Bright bands of color are
visible.
"Dull"
666
Colors begin to turn dull
bro1'm.
"Dark"
1332
},bch darker brmvn.
USEFUL COiNERSIO;,r FAcrORS
1 mile = 5,280 feet ~ 1,760 yards
1 square mile = 27,878,400 square feet = 3,097,600 square yards
Example No. 1 -
An oil spill appears to be 200 yards wide and 3 miles long
and best fits the standard term description "Silvery".
. 200
Length :: 3 miles; width = 200 yas. :: Inõ miles.
~ . " 200 .
Area = 1engh X \v"1.dtn :: 3 X 1730 sq. ml1es = 0.34 sq. miles.
Volume spilled :: area LTl sq. miles X gal. / sq. JYl..ile.
Volume = .34 X SO (from chart) = 17 gallons.
Example No.2
,
- An oil spill appears to be SO yards wide ~nd 300 yards long
and best fits the standard term description ttBrightly Colored".
d 15,OûO .
Are~ = 50 X 300 = 15,000 sq. yar s = 3 097 600 square m11es.
- 15 000 ' ,
Volume::: 3 097'600 X 200 (from chart) = .97 or 1 gallon.
, ,
NOTE: Above chart is from ~le COUI1Cil on Environmental Quality's "National
Oil and Hazardous Substances Pollution Contingency PIan°.
--
10
- - - - ---
('
(
I
\
\ .
(~
'\
(
DTIfIES & RESPO:{SIDILITIES
, Alaska District Op~rations Hanag8r:
To ma:.1ze a decision as to \'¡hetI1êr or not the em~rgenc:y plan goes
into effect.
Clean Up Coordinator:
To effect the execution of the plan.
Clean Up Operations Supervisor:
To establish an operational plan for tlle clean up.
Well Control Supervisor:
To devise, select and utilize operations for controlling or repairing
the well.
Public Relations Officer:
To effect a program to maintain t1~ best possible public relations.
Governmental Tedll1ical Liaison Officer:
To notify appropriate Governmental Agencies.
To convey pertinent
i11foTW3tion from governmental sources to local personnel.
Wildlife Officer:
To devise, select and utilize methods, teclmiques, equipment and
ma terials for POL ,~\ ~,r, ti ve and remedial measur~s to lvildlife and
vegetation.
Legal Advisor:
He will render legal advice and consultation pertaining to the oil
spill clean up.
Claims Officer:
To investigate and effect sett16aent for claims.
11
(
(-
" ,
. Cc~ications Facilities Officer:
('
\
To effect the installation of co!iG1lunications for ~le use of persormel
engaged in the clean up operations.
Tr~jSnor~ation Officer:
.
Arrange for tTanspo~t~:~c~ fo~ ~ersoThlel, equipnent, n~tðrials and
supplies to be used in the clean up operation.
Clean up Operations Procurement Officer:
I-Ie ~vi.ll make arrangements for, obtain and provide the equipI:lent,
materials and supplies need3d for the cle2~ up.
Techniques and 1!aterial Evaluator:
To make an evaluation of spill contairunent, control and clean up
tecÌ1Jliques and devices.
1 rake evaluation on fie'" methods and proposals.
Offshore Clean Up Foreman:
{
\
He 'viII direct the clean up operations in and on \'la ter areas.
Onshore Clean Up Foreman:
He will direct the clean up operations onshore and land areas.
Labor Recruiter:
Employ or make provisions for HOr&"Tjlen for the clean up operations.
Buyer:
He will purchase, rent, borrm.¡ or obtaJ.:a cctuipment, matE'rials and
supplies for the -clean up operations as d~.T~cted.
Well Site Drilling Engineer:
To supervise well control and repair under direction of 'VeIl Control
Supervisor.
~'!cll Site Drilling Foreman:
To follm.; the directions of the Well Site Engineer.
12
~'IN ISLAND
.t
,
, '
. I
- . .
(
--
(
'(
(--
\
/'
I
~
POLLUfIO:-J CO;.ITROL HA..TERIALS ON I-IRID WITI-IIN OIL INDUSTRY
I. Drift River Terminal (344-2547)
A.
CollectL~g Agents
1. Strmv - 1,000 bales
B. Ernuls ifying Agents
1. Polycomplex A-II - 5 drtmlS
C. Booms, Pumps and Related Equipment
1.
2.
800' boom.
Floatation skimmer with pun~ rated at 120 gpm w/440 volt motor.
3. Centrifugal pump, 2,000 bph at 30 psi powered by Caterpillar
diesel engine skid mounted.
4. One Oil Mop, Inc., surface skimming tUli t.
5. Three small centrifugal pumps rated at 50-70 gpm each.
6. Vacuum tank ,rith pump, trailer mounted.
7 . Two 50 kw genera tors.
8 . One air pump.
9. One Joy 125 air compressor.
D. Loading/Earth Moving Equipment
1.
2.
Case front end loader.
Fork lift.
3. Caterpillãr D-6 dozer.
4.
Caterpillar D-8 dozer.
5. One 2 - ton dump truck.
6 . 11"0 2 - ton boom trucks.
E. Hiscellaneous Items - Steam Cleaner, Hard Hats, Life Vests, Hand Tools
F. Transportation
1.
Contract G-3 helicopter.
2.
Contract Navajo bvin, 8-place, 24 hour basis at AnChorage.
,...
14
(- ','
( 'r
I
" ,
< .
II. Standard Oil Refinery, Kenai Pipeline Dock (776-8161)
f ",
A. Collecting Agents
1. Burlap sacks - 1 bale (300).
2. Straw - 1,100 bales.
B. BCOrlS, PutIps & Related Equiprr.ent
1. 400' Grafco sorbent boom.
2. One 2" Home1i te gas driven sump pump.
3. One 10610 air driven duplex pump.
4. One 4" X 3" diaphragm pump, gasoline driven.
s. One 50 bbl. trailer motmted vacuum truck.
C. Loading/Earth r-.k>vÌIlg Equip1rent
1.
Front end loader, 1/2 yd. on Ford tractor.
2. Mobile 7 1/2 ton crane.
D. Miscellaneous Items - Life Vests, Hard Hats, Hand Tools
(
III.
Standard Oil, Swanson River (283-4551)
A. Collecting Agents
.-
1.
Straw - 52 bales.
2. Excelsier - 25 bales.
3. Oil Blotter - 50 bags.
4.
Sorbent Type C - 400 bags.
B. Emulsì.£ying Agents
1. Slick-Off - 1 drum.
C. Booms, Pumps, and Related Equipment
1.
300' of 12t1 skirt boom.
2. One -2" X 3" Homelite pump, gas driven.
3. Six 500 bbl. Baker tanks.
4. One 50 bbl. VaCtIDIn truck on flatbed.
5. One steam generator on truck.
15
\
,
(
/
I
"
.
. I .
, ,
, IV.,. Anchorage, Port Area
( .
A.
300' boom.
. v.
Granite Point
A.
~o 0 b..." ~ - 5 """"""'¡
oJ e,.... 2..':;; ;:, I... - a.. .
VI. On Each PIa tforn
r
A. 1\';0 drums Polycomple.~ A-II dispersant.
B.
20' to 22' diesel powered rescue boat.
c. Niscellaneous i terns - Life vests, hard hats, etc.
VI I . Manpower Pool
A. Consists of on-duty and off-duty operating personnel available 24
hours daily.
VIII.
Shell Oil, Onshore Site (776-8473)
A.
1,000 lbs. Pittsburg Corning Sea Beads.
B. Oil skimmer boqm.
(
IX. Atlantic Richfield, Kenai Warehouse (283-7144)
A.
Collecting Agents
1.
2.
25 bales Type 156 oil sorbent pads.
35 bales Type 151 oil sorbent pads.
3.
4.
30 bales Type 270 sorbent booms (5 booms per bale).
4 rolls Type 100 sorbent material (3/8" X 36ft X 150t per roll).
B. ~lisce11aneous equipment
1.
19 rakes.
2. 21 pitchforks.
3. 32 round-point shovels.
4. 24 square-point shovels.
5. 10 three-gallon buckets.
6. 1\'10 pneumatic-tired Hheel barro,vs.
7 . 1\..¡el ve 3-ce1l explosion proof flashlights with batteries.
8. 1\'10 600' reels of 1/2" nylon rope.
16
(
(
, ~
XI. ~1Ìl1ips Petroleum Company (776-8166)
( -
A.
Collecting agents
I.. Ten 150 trolls 3'A Type 100 sorbent..
2.
9 bales :);.1 Type 126 s"'¡~~ps.
3.
5 bales :)¡.I TY'f.è 151 pD.t:s.
4. lï bales 3M Type 270 boOI:1.
5.
6.
4 Con wed sorbent b1aIL\ets 3' X 200'.
10 Con,.¡ed 25 I sorbent booms.
7.
5 bales Com.¡ed pads 17.5 X 17.5 (110 per bale).
B.. Chemcals
2 drums Shell Oil Herder.
1.
2.
2 drums Exxon Corexit 7664.
C. Loading/Earth r.bving Equipment
(
1. John Deere 350 bulldozer.
2. Case 580 back hoe and front end loader.
3. Shovels and miscellaneous hand tools.
XII. union Oil, Granite Point Onshore Site (344-4734)
A. TIlree btmdles absorbent.
B.
2" portable gasoline powered water pump.
C. Motor grader.
D. Back LJe.
E.
F. Miscellaneous hand tools.
4 WD pickup.
XIII. Union Oil, Kenai Gas Field (262-4782)
A. Collecting Agents
1.
3 boxes Sorbent Sciences Corporation VB filtering boom.
2.
4 boxes 17.5 X 17.5 Con\.¡ed sorbent pads.
3. One roll sorbent pad.
17
, ,
, :
(
(
.'
(
(
"
---
(-
(-
.. B. Pumps and related equipment
1.
200 gallon tandom axle fire fighting trailer with portable
gasoline driven 60 gpID pump.
c. Transportation
1.
2.
4 ~17\ P;r..~~ .iJ..""1 "!"IT -n~:o "I'T"-=' """ole~ì--o""'o
nU """"""~.t" W ..J. ..-\1..0...1 ~ '-o.....J... .;............ L.......- ,t-" - ~...'-'.
3.
4 wn pic:~p "lith APL radio.
2 WD picl'Up utili tybed "lith radio and telephone.
XIV. Union Oil, Nikiski Dock (776-8104)
4. Car "lith radio and telephone.
A.
Collecting Agents
1.
2.
20 bales Type 150 oil sorbent pads.
30 bales Type 151 oil sorbent pads.
3.
4.
24 bales Type 270 oil sorbent boom.
4 rolls Type 157 sorbent material 3/811 X 36" X 150' .
B. Miscellaneous Equipr.ent
1.
20 rakes.
2. 12 pitchforks.
3. 12 round-point shovels.
4. 12 sguare-point shovels.
5.
6.
12 three gallon plastic buckets.
2 pneumatic-tired wheel bl~'rrows.
7. 12 flashlights.
c. Transportation
1. 1\"0 2 WD pickups both "lith radios and one "lith telephone.
18
r
,
\
(
(
EQUIPHENT AVAILABLE THROUGH C. I. R. O.
Union Oil Company is presently a member of Cook Inlet Response
Organization. This organization is a consolidated effort to supply the
equipment that may be needed in ~~e event of an oil spill.
"Mne equ~"""""'O11- '''''-,'It "":In ~=> ,'c~,.i b.,.. 1-h.=. -c,...,~.c.r co""""""""";es to date 1S
J.J .J.:-,u"".,,'" t..~- '-w -'" ~""u. j U.I...... 1\.....--,-, jH:,a.¡J..J,. .
as follm'ls:
1 ea.
30' X 17 1/2' X 5' steel seine skiff wit~ built in steel oil
stor3.ge tanks and tm., bits, D 334 turbo charged and aftercooled
diesel 300 HP engine with hydraulic starter, ttcin disc clutch
1dth 3.83 to 1 reduction gear, engine drive hydraulic system
includes steering, thruster, starter and cathead, 40 X 30 brass
1m.eel \dth 2" stainless shaft, 16,000 gallon crude oil storage
tanks. Capable of making 10 knots fully loaded.
1,000 ft. Pacific Pollution Control "Aqua Fence" boom "lith bIO toWiJlg
bridles.
1 ea.
1 ea.
(
1 ea.
1 ea.
1 ea.
1 ea.
2 ea.
21 ea.
'~
BP Vikoma "Komara" mini skirmner comolete "lith manual start 5 lIP
J..
diesel pm'lered hydraulic pump and skimmer head, complete with
hydraulic hose, spare parts and oil discharge hose.
Viko:Ja Sea Pack "lith 1500 I sea-type boom that can be deployed
while in tow of work boats or purse seine skiff.
Cyclonet Dynamic 050 system mou.Tlted on a Zodiac ~Iark V boat
complete \vi th trailer.
Cyclonet Dynamic 070 system fOT installation on present seine
skiff.
Cyc1onet Dynamic 120 system for use on the Alaska Husk)' in the
Nikiski area.
Model 3100 Locheed skimmer for port area in Anchorage.
Nodel 2200 Simplex 300 gallon helicopter assist :;p , "I tmit for
spraying chemical dispersants.
Bird seaTers.
10,000 gallons Gorexit 9527 - 5,000 gallons located in Area Warehouse,
North Kenai; 5,000 gallons located in Manley's Freight Tenninal,
Homer.
19
,
, .
r
I
\
. '
Product
A.
Collectlllg Agents
Straw
Sæ.¡dus t
Termessee Clay
(Kitty Litter)
Venniculite
B.
Sinking Agents
Cement
Barite
Sand
(-
!
l
POLLUfIO:J COi'ITROL ~íATERIAL
COM~.IERCIALLY AVAILt\BLE IN ALASKA
SC-:..1:-ce
Matanuska Valley
Jack Seamans
John Nash
745-3796
Uni ted Ltnnber
PO Box 6809
Anchorage) Alaska
243-4545 Office
344-7812 Mill
Alaska Mill & Feed
276-6016
Kaiser Cement &
Gypsom Corporation
Ocean Dock Road
Anchorage) Alaska
277-7023
- Magcobar
6601 Linden Drive
Anchorage, Alaska
279-0404
Anchorage Sand &
Gravel
1800 East 2nd Ave.
Anchorage) Alaska
274-5691 Office
344-1574 Plant
20
Delivery
1'-1atanuska Valley
Sawmill at Whittier now. They
have no market for sm.¡ùust and
have been burning it. Uni ted is
building a remanufacturing and
drying plant three miles south of
Anchorage. They anticipate a
large amount of sawdust \.¡ill be
. available.
10# sacks. Five sacks in one bale.
Approximately 2T on hand.
Not carried in Anchorage stock.
Lumber companies could get it on
special order.
24,000 bbls. in Kenai (RTD).
79) 000 bb1s. in Anchorage. Ovill
double capacity). Buyer's barge
a t Anchorage. Buy through Halli-
burton at Port Nikiski. ConversiC'n
376lbs.fbbl.
195 Tons in Anchorage
400 Tons at Rig Tenders Dock.
30 ) 000 cubic yards available.
," .
, ,
,c-
C. Emulsifying or Solubilizing Agents
(
Polycomples A-II
Dry Detergents
Wet Detergents
D. Skimmers
Slikskim
E. Booms
Slik-Bar
(
F. Sorbents
Guardian O1emical
Long Island, N.Y.
Coll~~ta Co~oTation
Anchorage, Alaska
279-1536
Colletta Corporation
Anchorage, Alaska
279-1536
Neirad Industries
PO Box 295
Saugatuck, Conn.
Neirad Industries
PO Box 295
Saugatuck, COM.
Minnesota Mining &
t.tanufacturing
5331 ~finnesota Dr.
Anchorage, Alaska
276-2363
Crmv1ey Environmental
Anchorage, Alaska
344-1511
21
Colletta Corporation (279-1536)
4608 Lois Drive (PO Box 3188),
Anchorage. 80 bb1s. on hand,
500 - 1000 in reserve and
available via air or high\'¡ay.
Approximately 20 - 30 tons
Approximately 100 bb1s. Power
~1ite Lux, etc.
Alaska Expediters
Anchorage, Alaska
279-1923,279-1914
Alaska Expediters
Anchorage, Alaska
279-1923,279-1914
200 to 250 of each 3-M product in
stock. (Revolving stock)
200 to 250 of each 3-~1 product in
stock. (Revolving stock)
,
, , .
(
(
,
,
(
(-
\
,'-
,
~
ŒJNTRACfORS .AND EqUIP~~ AVAILABLE
KENAI / SO LrorNA. AREA.
I. Contractors
A. Advance Controls
B. Arctic Asphalt
C. B & B Oil Field Construction
D. Bro'tm & Doyle
E. Cook Inlet Construction
F. Frontier Sand & Gravel
G. Jackson & Garland
H. Northern Oil Operations
I . Peninsula Ready Nix
J. Qwick Construction
K. R. L.'s Oil Field Tool Rental
L. S. K. 1'1. Construction
M. Wade' 5 Oil Field Welders
II. Equipment
A.
B.
2 - D9 cats
6 - DB cats
c. 4 - D7 cats
D.
8 - D6 cats
E. 10 - JD 450
F.
G.
15 - JD 350
5 - 996 cat loaders
H.
8 - 2 to 5 yard front end loaders
I.
J.
20 - 12 yard dump trucks
6 - belly loaders
22
£z
)
~:)TU¡ ~~:n~.\ - 01
Sdu:-e~:> UO¡ 08 o:¡ 01 - ZI -I\~
saOlppBq - oz
s~apB~ - 9
)
-N
-1
-)I
)
c .
'.)
(
.'
\
'--
('
(
COM\IITMEi'IT OF MAiWOWER
1.
2.
Union Oil Field Personnel - 62
Contract Roustabouts - 12
3.
Union Oil Office Perso~~el, Kenai - 10
4.
5.
Union Oil Office Personnel, Anchorage - 77
Area Contractors - 70 Guaranteed
For telephone information to all Union Oil personnel, contact the
Union Oil Kenai office at 283-7505, or Anchorage office at 276-7600.
--
24
,
(
(
'-
~
,
(-
Û\mer:
N::UT.ð:
Type:
Length, Be~~, DT.a.ft:
Brake HOrSelJO1..¡er:
..
Cre~..¡ :
Status :
Owner:
Name:
Type:
Length, Beam:
Br~~e Horsepower:
Cre1"¡ :
Status :
Oiffier:
Name:
Type:
Length, Beam, Draft:
Brake Horsepower:
Cret..¡ :
Status :
OÆler :
Remarks :
. (
MARINE EQUIP!~1E.'IT AVAILABLE
Vessels - Kenai Area
Foss Launch & Tug
A1as~<..a Husky
SulJply
182' X 34' X 11 t
3,400
S Lx
Chartered to Amoco Production Company.
Available for pollution control 24
hours clail Y .
Donna Foss - in Valdez
Rig Tenders
Rig Engineer
Supply
170' X 341
2,000
Four
Temporary charter,
pollution control.
available for
Vessels - Whittier
CrQ1ýley LalUlch & Tug
Titan
Tug
651 X 17 1 X 101
900
Unknown
Under charter to Alaska Hydrotrain.
Local us e onI y .
Crm..¡ley Launch & Tug
~vO vessels are used for Alaska Hydro-
train tows and are occas ionally in
Whittier. Both are tugs. One is 2800
HP and the other is 7000 HP. Could be
used at discretion of 11ydrotrain.
25
\ ,
(
(
\
',--
A
,
. .
\'
III.
(-
(
AIR TRA..~SPORTATION CAPABILITIES
. I.
Era Helicopters - All available for pollution control 24 hours daily.
A.
Bell 20S!, Rig Tenders Heliport, Chartered to Union Oil, 15 passe:1-
gers or 2500;#.
B. Two Bell 204-:3, Ni.:-~ki. Heli;'J:'~, 10 passengers or 2000#.
C.
Four Bell 206-B, 4 passengers or 1000#.
D. 1\"0 Bell 212, 15 passengers.
E. Two ill 125, 8 passengers.
F.
G.
One Merlin III, 5 passengers.
One 1>!erlin II, 6 passengers.
H. Tt.;o Cessna 402, 6 passengers.
II. AnChorage Helicopters - All available for pollution control 24 hours
daily.
A. Nine Bell 206-B, 4 passengers or 1000#.
B.
One Bell 212,15 passengers.
Kenai Air Service
A. One Bell 212, IS passengers.
B. Two Bell 205, IS passengers.
c.
14 Bell 206-B, 4 passengers.
D. One Bell 206-L, 6 passengers.
E. One Ï't1i:..rlin IV, 14 passengers.
F.
G.
One Beechcraft King Air, 9 passengers.
One Rocb.¡e11 Aero-Commander, 9 passengers or 3000#.
H.
One Piper PA-31-3l0 Navajo, 7 passengers or 2000#.
I. ~.¡o Piper PA 34-200, Seneca,S passengers.
J.
One Cessna 207,5 passengers.
K. T\Ilo Cessna 180,5 passengers.
26
\
/
"
\
'-
r
IV.
(
(
L.
M.
One FA-IS.
One Cessna 180, float equipped.
Miscellaneous
A.
15 f;xed ,~-ing aircraft from various air ta.xi operators in the lCenai
area.
27
.----
--- ---- -----
---
(--
/ -....
r~.
,
. r
UNION OIL corvIPAi'lY RtillIO EQUIPMENT LIST
~ ^-
Location H~lke Watts Megacycles Call No. U.D. No.
>
I
Monopod Platform (776-8511 or 279-9022)
Foreman's Office (Avionics) Genave 5 123.05 1\1DZ 3 108
Marine Base learn 25 156.800 WAB 937 109
Ch. 10 or 16
Union Set G.E. 70 48.90 KGZ 472 118 ,~
Unit Set G.E. 60 48.74 KDX 325, 1t7 119
Portable ]\b toro 1a 3 48.74.48.90 KJ 8349 130
Portable, Crane G.l1. 25 48.90/48.74 K1 8349 131
West Brucker lcom 25 VI IF Marine WYQ 3747 132
Eas t Brucker lcom 25 VI-IF ~ far me WYQ 3747 133
UHF Portable l-Iotoro1a 5 456.600 KZ 5660 135
UHF Portable Motorola 5 456.600 KZ 5660 136
N UHF Portable ~/Iotorola 5 456.600 KZ 5660 137
00
Grayling Platform (776-8632 or 277-8318)
Production Office (Avionics) Genave 5' 123.05 WZD 2 107
Marine Base lcom 25' 156.800 NAB 938 115
Ch. 10 or 16
Unit Set G.E. 60' 48.74 KQP 203, /tIS 116 '\
Union Set G.E. 70, 48.90 IillX 326 117
UHF Portable Motorola 5 456.600 KZ 5660 138
UI-IF Portable Motorola 5 456.600 KZ 5(,60 139
UI-IF Portable Motorola 5 4~. 600 IC2 5ó60 140
East Brocker lcom 25 ' VI IF Marine -1'lYQ 3647
West Brucker lcom 25 ' VI-IF Marine WYQ 3647
Unit Portable G.E. 25" 48.90/48.74 KJ 8349
Granite Point Platform (344-4734)
Union Oil Set
Marine Base
Control Room (Avionics)
13ruc~er Capsule
Motorola
lcom
Aertron
lcom
100
25
10
25
48.90
156.800
122.8
VHF Marine
WXC 970
WXF 623
WAL 7
WYQ [;749
r-~
"\
~ .-
Location Make Watts Megacycles Call' No. U.O. No.
Granite Point Onshore (344-4734)
Union Oil Set Motorola 100 48.90 WXC 971
Avionics Aertron 10 122.8 WRI{ 5
Anchorage Office
G.E.
300
48.90
KGZ 469
/~
Units
Kenai Production Office Motorola 60 48.90 k1JT 600 Unit 8
Kenai Gas Field Motorola 100 48.90 Kill 601 Unit 10
ERA Heliport Motorola 60 48.90 Kur 597 Unit 3
N KPL Site Motorola 60 48.90 KZX 758 Unit 11
«.Q Eas t Forelands ~btorola 40 48.90 KDX 325 Unit 5
EÀ~cditcr's Office Motorola 60 48.90 Kill 599 Unit 6
Expediter's Residence Motorola 30 48.90 k'DX 325 Unit 1
Granite Point Platform Motorola 100 48.90 vncc 970
Granite Point Onshore Motorola 100 48.90 WXC 971
Mobile Units -~,
\
Area Superintendent Car G.E. 100 48.90/48.74 KJ 8349 Car 5
~bnopod Foreman Car G.E. 75 48.90 KJ 8349 Car 2
Grayling Foreman Car G.E. 75 48.90 KJ 8349 Car 7
~hintenance Foreman Car G.E. 75 48.90 1\..J 8349 Car 9
Expediter Pickup G.E. 40 48.90/48.74 I~J 8349 Car 1
Assistant Expediter Pickup Motorola 100 48.90/48.74 KJ 8349 Car 11
Kenai Gas Field Pickup G.E. 90 153.350 KE 5901 Car 40
Kenai Gas Field Pickup G.E. 90 153.350 KE 5901 Car 39
Kenai Gas Field Foreman Car lYbtorola 55 153.350 KE 5901 Car 52
KPL Pickup M:>torola 55 153.350 KE 5901 Car 41
,/ -
~
r---.
\
\
- '"
,..
,f
:~I~:ISKI MARINE TERMINAL CO~1PLES OPERATIONS GUIDE
..
Facility Band Frequency Call Sign
I
OIEVRON U.S.A. Incorporated - 776-8161
Collier Carbon & 01emica1 - 776-8121 VHF Ch 7A 156.35 KM 7571
VHF Ch 10 156.6 KM 7571
VI-IF Ch 13 KM 7571
VHF Ch 16 156.8 WAE 9 3°-~,
~
Kenai LNG (Phillips) - 776-8166 I VI-IF Ch 7 A 156.35 KL 5833
VI-IF Ch 10 156.5 KLT 88
VI-IF Ch 16 156.8 KLT 88
Kenai Pipe Line Company - 776-8711 AM 2182 KEH 52
AM 2512 KBH 52
SSE 4136.3 WSY 22
~ SSE 6210.4 WSY 22
0
SSE 8284.4 WSY 22
SSE 12428.0 WSY 22
VI-IF Ch 7 A 156.35 KX 8177
VI-IF Ch 10 156.5 WSY 26
VHF Ch 16 156.5 WSY 26
Pacific LNG Company - 278-9571 /~
"-
Rig Tenders Dock - 776-8880 VHF.Cn 7A -156.35 KI'D 75
VI-IF eh 10 156.5 KTD 75
VHF eh 16 156.8 KTD 75
Tesoro Alaskan Refinery - 776-8191
(
\ .
DIRECTORY - OUTSIDE INDUSTRY
(
, ERJ\. Helicopters of Alaska
Rig Tenders Dock
Anchorage
Andy's Flying Service
." .
.h.ena~
Kenai Air Service
Kenai
u. S. Co as t Guard
Anchorage
Juneau
Alaska State Troopers
Soldotna
Andlorage
(
Rescue Coordination Center
Anchorage
Alaska Disaster Office
Anchorage
Crrnvley Environmental Services
Anchorage
Providence Hospital
Anchorage
Central Peninsula General Hospital
Soldotna
Pellinsula Med" .:a1 Center
Soldotna
Environmental Protection Agency
Anchorage
Polar Scientific Lab
Kenai
Chemical & Geological Labs of Alaska
And10rage
31 r
776-9381 or 776-8215
272-5422 or 278-4651
283-7676
283-7161
283-7162
283-7561
271-5137
586-7340
262-4052
Zenith 9300
or 333-9549
277-2131
272-0594
344-1511
276-4511
262-4404
262-4401
271-5083
or 344-9327
283-7029
279-4014 .
(
(
,
"--
. .
. . '
. , .
~
(,
('
.
AIR POLLlJ1'IO~
Effective Januar¡ 4, 1971, the Greater Anchorage Borough, the Kenai
Peninsula Borough and the :Iatanuska-Susitna Borough fonned the HAir
Resources Hanagement District".
111e District has issued "Regulation I of the Air Resources Management
District".
Under Article 7, Regulation 1, a Permit "Notice of Construction and
Application for Approvaltl is required.
For more information call John Amundsen at 283-7505.
--
32
( ~
(
.'
.
. .
r "
t
. .
\ r .
(
(
\'
PLEASE REPORf k'N Œll\i\¡GES I:~ 'TIIE UNION OIL CO~.1PA1\JY, ALASKA DISTRICT.
\I
,
poLLurrOi'J CO~'TINGENCY PLA.'J
Th~ Pl~"1. shotùd be corrected. to read:
Page
MAIL TO:
Union Oil Company of Cd.-ifornia
Safety Supervisor
283-7505
P. o. Box 7600
Kenai, Alaska 99611
33
,
, .
, .
(
~
(
. . r
r
.
E. F. Griffin
Anchorage
L. J. Anderson
Anchorage
J. R. Callender
Anchorage
R. R. Culver
Kenai
D. S. Crm.¡£ord
Anchorage
J. D. Amundsen
Kenai
C. R. Owens
Kenai
H. W. Piland
Kenai
"'"-
(
UNIO~ OIL COMPA\Y OF CALlFOR1~IA
Pr".J11 n..&.L; f",~ Con+;T"Icr~"""'I.""" 'Dl an Book
. --.... -'-.. W~."")V. '-: ...-
1979 ?vIailing List
34
(
~bnopod Platform
Kenai
Grayling Platfonn
Kenai
Granite Point Platform
Kenai
Granite Point Onshore
Kenai
Kenai Gas Field
Kenai
..'
, .
\
(
(
(-
I
~ION OIL CO~IPANY OF CALlFOR1\IIA
Pollution Contingency Plan Book
1979 Þ1ailing List
l-fr. R. W. Yarbrough
Broadway Plaza Bldg.
Union Oil Company of California
P. o. Box 7600
Los Angeles, California 90051
lYIr. J. J. Wasicek
Union Oil Center, Room 5M-30
Union Oil Company of California
P. o. Box 7600
Los Angeles, California 90051
Dr. C. B. Scott
Union Oil Center, Room MM-P
Union Oil Company of California
P. O. Box 7600
Los Angeles, California 90051
3S
f
..
(-,-~
(
"
f:
't
. 1- .
, t-
. \
, .
~
. v f
"
...
"-
('
(
UNION OIL COMPAlW OF CALIFORNIA
Pollution Contingency Plan Book
19ï9 ~bilLlg List
Nr. Jack Jeffries
Cook Inlet Pipe Line Company
Drawer 4 - XX
Anchorage, Alaska 99509
Mr. AI Mechler, Jr.
Marathon Oil Company
P. O. Box 2380
Anchorage, Alaska 99510-
Mr. \Ii. W. Hopkins
Alaska Oil & Gas Association
505 West Northern Lights Blvd.
Anchorage, Alaska 99503
United States Coast Guard
Captain of the Port
P. O. Box 1286
Anchorage, Alaska 99510
Chief, ~~ritime Environmental Protection Branch
Seventeenth Coast Guard District
P. O. Box 3-5000
Juneau, Alaska 99801
Mr. Ken Lewis
Atlantic Richfield Company
P. O. Box 1400
Kenai, Alaska 99611
Mr. W. M. Shreve
Union Oil Company of California
1076 Ocean Dock Road
Anchorage, Alaska 99501
36
,
--- -
--_.- .~-~-----
- - STATE Of ALASKA ,
.' ALASKA (' . AND GAS CONSERVATION CCf °v1ISSION K
MONTHLY REPORT UF DRILLING AND WORkOVER OPERA TIONS1\
1 Drrillng well ex Workover operation 0 ~
L--- ,
2 Name of operator 7. Permit No
UNION OIL COMPANY OF CALIFORNIA 79-72 ~
3 Address 8 API Number
P.O. Box 6247, ANCHORAGE, ALASKA 99502 50- 50-283-20065
4 Location of Well 9 Unit or Lease Name
at surface 1068.5l'S & 381.51'W of the N.E. Cor., Sec. 9,
T20N, R10W, S.M.
TRA.TT. RInGE UNIT 111
10 Well No
()
111
11 Field and Pool
5 Elevation In feet (indicate KB, OF, etc) \6 Lease Designation and Serial No
216.6' above MSL AnT. 11f16R70
Sec. 3, T20N, R10W, S.M.
For the Month of
OCTOBER
19 80
,
12 Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Depth at end of month
Footage drilled
Left a fish @ 13,404',
to 13,210'.
Stuck drill pipe & left a fish @ 13,210',
Redrilled hole from 12,048' to 12,354'.
13 Casing or liner run and quantities of cement, results of pressur~ tests
12,354'
447
top @ 13,312'.
Kicked off above fish @ 13,167'.
Dyna-dril1ed
top @ 12,141'.
Kicked off above fish @ 12,048'.
14 Coring resume and brief description
15 Logs run and depth where run
16 DST data, perforating data, shows of H2S, miscellaneous data
'--, -
ii,1 ['-..r"..
t" L "" 'I' '""D-"
'. ~'"' 6 ~. I'" ,I
"-.
r ',/""",1 '" ~ ~
'~'J' '~'.~/"J,
..... t "
0 ,,~
A1-1-,;(.1 0 ¡ (> r:
,1(..,.:::-,1"'",..,..... ,..,
. """"" l/'--..
AnC;lJr~~.~,,;¡...1 '~:;~'ì
",,'J '
17 I hereby certify that the foregoing IS true and correct to the best of my knowledge
Dist. Dr1g. Supt.
SIGNE DATE
NO -- eport on this form IS required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the Alaska
011 d Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed
Form 10-404
Rev 7-1-80
'R~~E
11/7/80
Submit In duplicate
- -- -
--- - - -; '-¥'-"'.. ~~-...--
,
f STATE OF ALASKA (
ALASKA,,-,.L AND GAS CONSERVATION C ,I1MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
DRILLING WELL I2Ç
COMPLETED WELL 0
OTHER 0
2 Name of Operator
UNION OIL COMPANY OF CALIFORNIA
7 Permit No
79-72
3 Address
P.O. Box 6247, Anchorage, Alaska
4 Location of Well
99502
8. API Number
50- 783-20065
9 Unit or Lease Name
1069.58' S & 329.03' W of the N.E. Cor., Sec. 9, T20N,
R10W, S.M.
TRAIL RIDGE UNIT
10. Well Number
TRAIL RIDGE UNIT #1
11. Field and Pool
5 Elevation In feet (indicate KB, OF, etc ) 6 Lease Designation and Serial No
216.6' above MSL AnL #56870
Check Appropriate Box To Indicate Nature of NotIce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF:
WILDCAT
12
(Submit In Triplicate)
Perforate 0 Alter Casing 0 , Perforations
Stimulate 0 Abandon 0 Stimulation
Repair Well 0 Change Plans 0 Repairs Made
Pull Tubing 0 Other ~ 1d~ Pulling Tubing
(Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion)
. . . .
13 Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25105-170)
(Submit In Duplicate)
0 Altering Casing
0 Abandonment
0 Other
0
0
0
XJ
Due to a fish left in the hole it was necessary to side track Trail Ridge Unit #1
as follows:
1.
2.
3.
Laid in 607 L.F. cmt. plug from 12,141' to 11,534'.
Polished off plug to 12,048'.
Kicked off and redril1ed 8~" hole from 12,048'.
Verbal approval given by Russ Douglas 10/24/80.
~ -----
'-----
î '\ ',1
-..., '"'
, '", .
..
14 I hereby certify that the foregoing IS true and correct to the best of my knowledge
, Signed ~ ,- --- ~. 0 ~ 1l<.ß Title
The space below ~mm ISSlon use I Cd
Conditions of Approval, If any
Dist. Drlg. Supt.
Date
10/27/80
Approved by
Form 10-403
Rev, 7-1-80
COMMISSIONER
By Order of
the CommisSion
Date ------
Submit "Intentions" In.Trtplicate .
and "Subsequent Reports" In Duplicate
, STATE OF ALASKA (.
ALASK vlL AND GAS CONSERVATION CWMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
DRILLING WELL Œ
COMPLETED WE LL 0
2 Name of Operator
UNION OIL COMPANY OF CALIFORNIA
7 Permit No
79-72
8 API Number
3 Address
P.O. BOX 6247, ANCHORAGE, ALASKA
99502
50- 883-20065
9. Unit or Lease Name
4. Location of Well
1069.58' S & 329.03' W of the N.E. Cor
R10W, S. M.
, Sec. 9, T20W,
TRAIL RIDGE
10 Well Number
TRAIL RIDGE UNIT #1
11 Field and Pool
5 Elevation In feet (indicate KB, OF, etc ) 6 Lease Designation and Serial No WILDCAT
216.6' above MSL ADL 56870
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF'
12
(Submit In Duplicate)
0 Altering Casing
0 Abandonment
0 Other
0
JJ1(
L--'
OTHER 0 t
;(//1
~1
~
r'
y
UNIT
(Submit In Triplicate)
Perforate 0 Alter Casing 0 ~ Perforations
Stimulate 0 Abandon 0 Stimulation
Repair Well 0 Change Plans 0 Repairs Made
Pull Tubing 0 Other ~ ¡t!~ Pulling Tubing
(Note Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion)
. . .
13 Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25105-170)
0
0
6a
Due to a fish left in the hole it was necessary to side track Trail Ridge Unit #1
as follows:
1.
2.
3.
Laid in 147 L.F. cmt. plug from 13,312' to 13,165'.
Polished off plug to 13,167'.
Kicked off and redri11ed 8~" hole from 13,167'.
VERBAL APPROVAL GIVEN BY RUSS DOuGLAS
10/9/80
R't':lrE~'\f~'~
a 'l t
---
~
OCT 2 0 1QSQ
Subsequent \Vork Reported
on Form No./c<to.;S Dated Ic/LL/tIJ
~Isa 011 , GdS L m~ \..~,. '. ,," " ,
M~ngtlt;.
14 I hereby certify that the foregoing IS true and correct to the best of my knowledge
Sogned t\,,:"" ~. C')()O,~ 'o'A ts~ Totl. Dist. Drlg. Supt.
The space below fo;~ommlsslon use / ~
Conditions of Approval, If any
Date
Approved by
Form 10-403
Rev, 7-1-80
By Order of
COMMISSIONER the Commission
Date --------~~~--
" " , '
Submit "Intentions" In Triplicate
and "Subsequent Reports" Ir'I Duplicate
10/17/80
Fort¡' No. 1~
REV 3-1-70
I. Oil
WELL
2 NA\fE OF OPERATOR
(
~
jd
L
~ß
J \'1,
~
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
GAS Q
WEll
5. API NUMERICAL CODE
50-283-20065
6. LEASE DESIGNATION AND SERIAL NO.
ADL
1156870
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
7. IF INDIAN 'ALOTTEE OR TRIBE NAME
OTHER
8 UNIT FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
3 ADDRESS OF OPERATOR
P. O. BOX 6247, Anchorage, Alaska
4. LOCATION OF WELL
99502
9. WEll NO
TRAIL RIDGE UNIT #1
1068.51'S & 381.51'W of the N.E. Cor., Sec. 9, T20N,
R10W, S.M.
10. FIELD AND POOL. OR WILDCAT
Wildcat
II SEe. T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 3, T20N, R10W, S.M.
12. PERMIT NO
13. REPORT TOTAL DEPTH AT END OF \fONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHA~GES IN HOLE CONDITIONS.
79-7?
94 ,
9/1/80
95
9/2/80
96
9/3/80
97
9/4/80
11,819'/186'
20" C. 982'
13 3/8" C. 4008'
12,009'/190'
20" C. 982'
13 3/8" C. 4008'
12,028'/19'
20" C. 982'
13 3/8" C.4008'
12,028'/0'
20" C. 982'
13 3/8" C. 4008'
Directiona11y drilled 12~" hole f/11,633' to 11,819'. Slugged
pipe, dropped survey, and Pooh. Hole is in good shape.
Rec. survey. RIH w/bit #73RR on BRA #80 (60' belly). Reamed
60' to bottom. Hole in good shape on trip. Directiona11y
drilled 12~' hole f/11,819' to 12,009'.
Directiona11y drilled 12~' hole f/12009' to
Circ. bottoms up. Made 15 std. short trip.
condition. Pooh. Layed down monel d.c. 'so
Sch1umberger unit. Worked on leak in unit.
12028'. Surveyed
Hole in good
Rigged up
Repaired Sch1umberger W.L. unit. RIH w/DIL log. Ran ~IL f/
12,028' to 9800'. Had unacceptable SP curve. Reran DIL f/
12,028' to 9800'. SP curve still showed signs of interference
and was unacceptable. Pooh w/DIL. Ran Sonic log f/12,028' to
9800'. Ran FDC-CNL log f/12,028' to 9800'. Reran DIL log w/
downhole ground f/12,028' to 9800'. SP curve showed slight
amount of interference but was acceptable (NOTE: All generator~
on location were shut down during final DIL log run). Ran
Dipmeter f/12,028' to 9800'.
f'"' -¡t^
,; ¡ "
'-jl'Y q ;~'1~{"
c ¡ ',';' '."'".~'
t !rr. "
, , \..'. ¡",,,
II
': (" v -
í\¡Y"ì"\':l¡~;J
14. I hereby c rtlf that the ,pgJtniAGlruJrJJl corre~ ./ 10/3/80
SIGNED -/í{" L~~TlTlE Dist. Dr1g. Supt. DATE
NO~Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
Form No 10..404
RE'.' 3-1-70 .
( SUBMiT IN 0 UPLlC A TE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
3 ADDRESS OF OPERATOR
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
I.
OIL 0 GAS 0
WELL WELL OTHER
2 NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
4 LOCATION OF WELL
(
5 API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO
7. IF INDlAN'ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
9 WELL NO.
TRAIL RIDGE UNIT #1
10 FIELD AND POOL, OR WILDCAT
11 SEe. T. R M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
98
9/5/80
99
9/6/80
100
9/7/80
12,028'/0'
11,932' F.C.
13 3/8" C. 4008'
95/8"C.12,028'
12,028'/0'
11,932' F.C.
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,028'/0'
11,932' F.C.
13 3/8" C. 4008'
9 5/8" C. 12,028'
r':r, ,"""':'~t~r',",¡'
f".r~,- ¡ ',I'
;,,"L \",.t ~ ." ,'-
0, C'T ~. C\ R~¡';'r"t
./ I '..). '"" \.. '>
¡, I.. (':,... '-II' CJ I '
1'\. "". ,.. '. (},..J
Þ "1::1..:\~" .
SIGNED
14. I hereby certify that the foregoing IS true and correct
RIH w/SWS gun and shot 45 SWS. Rec. 28, had 15 misfires, &
lost 2. RIH w/2nd SWS gun and shot 17 SWS. Pooh. Rec. 17 SWS.
Rigged down Sch1umberger. RIH w/bit #73RR on BRA #80 for clean
out. Reamed 120' to bottom. Circ. and condo mud for csg.
Pooh - saw 1 tight spot @ 11,206'. Remainder of trip smooth.
Down 2 hrs. to repair drawworks chain.
csg. Ran 81 jts. (3519') of 47# butt.
(8515') of 47# N-80 butt. csg.
Rigged up to run 9 5/8"
S-95 csg. and 210 jts.
Landed shoe of 9 5/8" csg. @ 12,028', float collar @ 11,932'.
Circ. mud and prep. to cmt. csg. Pumped 40 bb1s. of water
ahead of 800 sx. c1. "G" w/1% CFR-2, .5% Ha1ad 22-A, 3% KCL,
and 2 ~% pre-hydrated gel. Tailed in w/400 sx. c1. fiG" w/1%
CFR-2. Dropped plug and displaced w/20 bb1s. water and 855 bb1s
of mud. Bumped plug on F.C. w/2400 psi. CIP @ 13:38 hrs.
9/8/80. (NOTE: Had to displace cmt. job w/rig pumps as the
mud line to the Howco pumps was plugged). Released pressure
and floats held OK. Rigged up and injected 50 bb1s. of mud
down the 9 5/8" x 13 3/8" annulus @ 3 BPM @ 1650 psi. Listed
BOP stack and landed csg. w/s1ips in 13 3/8" head w/450M#.
Cut-off excess csg. and installed tbg. head.
CSG. DETAIL:
Item
Float Shoe
2 jts. S-95 csg.
Float Collar
79 jts. S-95 csg.
209 jts. N-80 csg.
, N-RO (,11r-off
Landed Below KB
TITLE
L.enJ{th
1.62
92.06'
1.65'
3,417.86'
8,473.03'
17 ?8'
Depth
12,028.00'
12,026.38'
11,934.32'
11,932.67'
8,514.81'
/1'.78'
24.50'
DATE
NOTE- Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-404
REV 3-1-70 .
( SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
GAS 0
WELL
3. ADDRESS OF OPERATOR
MONTHLY REPORT OF DRilliNG
AND WORKOVER OPERATIONS
0
1.
OIL
WEll
2 NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
4, LOCATION OF WELL
('
5 API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO
7 IF INDIAN ALOTfEE OR TRIBE NAME
OTHER
8. UNIT FARM OR LEASE NAME
9. WELL NO.
TRAIL RIDGR UNIT #1
10. FIELD AND POOL, OR WILDCAT
11 SEe. T. R. M (BOTfOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
101
9/8/80
102
9/9/80
12~028'10'
11~932' F.C.
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,028'10'
11~932' F.C.
l33/8"C.4008'
9 5/8"C.12~028'
SIGNED
14. I hereby certIfy that the foregolOg IS true and correct
Installed and tested tbg. head.
pitcher nipple, choke, and kill
5" in BOP. Installed 5" liners
survey f/ll,900' to 4000' while
Installed BOP stack. Revamped
lines. Changed 9 5/8" rams to
in #1 mud pump. Ran SDC Gyro
revamping equipment.
Completed running Gyro survey. Rigged down SDC. Tested BOP,
choke lines, kill lines, and manifold to 5000 psi. Tested
Hydril to 3000 psi. Worked 3 hrs. to repair leak in pitcher
nipple. RIH wlbit #78 on BRA #81 (clean out assembly) to
7871'. (Picking up D.P. rubbers on each joint). Could not
pick up D.P. w/400M# @ 7871'. Circ. and condo mud. Rotated
D.P. for 30 min. Attempted to pull D.P. Could pull w/pumps
on but not w/pumps off. Rotated 30 min. and Pooh w/350M# to
400M# pull. Found pin missing from one rubber and several
other rubbers had slipped causing excessive hole drag & torque.
RIH wlbit #78 on BRA #81 while pulling off all D.P. rubbers.
~) F" ", ~"'" .
r' * ,þ ~
,,¡; ~" '~ì\I;'f"
.~ ~\-t;¡ ,/:~-,
~ , J P
- -'
orT - 0 V1"~'~
..J ,.c,-
/1",
I" .
"
{" ~1 >:.. ¡ , ,'. ,
.- .. ,
r' ." -"', ~, -
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and n'lust be filed 10 duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-404
REV 3-1-70
( SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
(~
MONTHLY REPORT OF DRILLING
AND WORK OVER OPERATIONS
0
I.
OIL
WELL
2. NAME OF OPERATOR
GAS D
WELL
OTHER
5 API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO
7. IF INDIAN ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
3 ADDRESS OF OPERATOR
4. LOCATION OF WELL
9 WELL NO. TRAIL RIDGE UNIT III
10. FIELD AND POOL, OR WILDCAT
II. SEe. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
103
9/10/80
12,028'/0'
11,932' F.C.
13 3/8" C. 4008'
9 5/8" C. 12,028'
14. I hereby certIfy that the foregoIng IS true and correct
SIGNED
RIH w/bit 1178 on BRA 1181. Tagged F.C. @ 11,932'. Attempted
to test esg. to 5,000 psi. Pressure bled to 3000 psi in l~ min.
Pressured back up and formation took 3 BPM @ 4700 psi. Pooh wI
d.p. RIH w/Howeo RTTS and set @ 7951'. Tested esg. above
RTTS to 5000 psi - OK. Pumped in below RTTS w/3 BPM @ 3500
psi. RIH w/RTTS and reset @ 10,013'. Tested below RTTS to
5000 psi - OK. Pumped in above RTTS w/3 BPM @ 3500 psi. Reset
RTTS @ 8601'. Tested below RTTS OK and pumped in above RTTS.
Reset RTTS @ 8201'. Tested below RTTS OK and pumped in above
RTTS. Reset RTTS @ 8160'. Pumped in below RTTS and tested
above RTTS OK. Reset RTTS @ 8171' and tested below RTTS OK.
Pumped in above RTTS w/3 BPM @ 3500 psi. Isolated leak
between 8160' and 8171' (esg. collar @ 8165'). Pooh w/RTTS.
r~ 1- .
I";
,
e í ,"""
,
t
"
", I (- " ¡ " .
,t'"-,, -,. "" '>'(,
- "'- ,- -
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10404
REV 3.1.70
( SUBMIT IN DUPLICATE
STATE'OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORK OVER OPERATIONS
OIL 0
WELL
GAS 0
WELL
OTHER
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
3 ADDRESS OF OPERATOR
4. LOCATION OF WELL
(
5. API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO
7. IF INDIAN 'ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
9 WELL NO.
TRAIL RIDGE UNIT #1
10. FIELIJ AND POOL, OR WILDCAT
11. SEe. T R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
104
9/11/80
12,028'/0'
11,932' F.C.
13 3/8" C. 4008'
9 5/8" C. 12,028'
14. I hereby certify that the foregoIßg IS true and correct
SIGNED
Finished Pooh w/RTTS packer. RIH w/Howco EZSV cmt. rete & set
@ 8123' DPM. R.U. Howco and tested lines to 6000 psi. Pumped
into formation w/3 BPM @ 3950 psi. P.U. out of rete Pumped
10 bbls. of water, 400 sx. cl. "G" w/.5% CFR-2 (15.8 ppg), 2
bbls. of water and 55 bbls. of mud. Stabbed into retainer
trapping 1200 psi on annulus. Pumped into formation @ 3BPM &
3950 psi. Pressure went to 4300 psi when cement hit formation
& continued to increase to 5000 psi with 50 bbls. cement below
rete Sqz. held 5000 psi w/pumps off. CIP @ 11:05 hrs. 9/11/80.
P.U. out of rete & reversed out 32 bbls. (156 sx.) of cement.
Circ. & condo mud. Pooh. RIH w/bit #79 on BRA #82 (clean o~t
assembly). Tagged rete @ 8125'. Drill on rete
, '
fir -
, (
I, c.',
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate wIth the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No P-..4
REV. 3-1-70
1.
( SUBMIT IN DUPLICATE ('
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE 5. API NUMERICAL CODE
GAS 0
WELL
6. LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN .ALOTTEE OR TRIBE NAME
OTHER
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
MONTHLY REPORT OF DRILLING
AND WORK OVER OPERATIONS
OIL 0
WELL
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
8. UNIT FARM OR LEASE NAME
9. WELL NO.
TRAIL RIDGE UNIT #1
10. FIELD AND POOL, OR WILDCAT
II. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12 PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
105
9/12/80
106
9/13/80
107
9/14/80
12,038'/10'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,189'/142'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,301'/121'
13 3/8" C. 4008'
9 5/8" C. 12,028'
SIGNED
14. I hereby certify that the foregOIng IS true and correct
Dr1d. cmt. rete @ 8125'. Dr1d. 56' of firm cmt. f/8125' to
8181'. Closed rams and pressured csg. to 3500 psi - OK.
Pressured up to 4000 psi - OK. Pressured up to 4200 psi and
broke down sqz. Pressure bled f/4200 psi to 2700 psi in 45
min. Held 2700 psi (.89 psi/ft. gradient @ 8165' TMD). RIH
to F.C. @ 11,932'. Dr1d. F.C. @ 11,932', cmt. and float shoe
@ 12,028'. Drilled 8 1/2" hole f/12,028' to 12,038'. Circ.
btms. up and Pooh. RIH w/ 9 5/8" RTTS pkr. and set @ 8200'.
Pressure tested csg. shoe w/3500 psi and 76 PCF mud (.85 psi/
ft. gradient). Held pressure for 30 min. Released RTTS and
Pooh. RIH w/bit #78RR on BRA #83 (locked up assembly).
Directiona11y dr1d. 8~" hole f/12,038' to 12,161'. While dr1g.
had influx, @ 12 BPH, of formation water. (Chlorides increased
f/250 to 500 PPM). Dr1d. 8~" hole f/12,161' to 12,180' while
raising mud wt. to 78 PCF. Flow into we11bore stopped.
Continued dr1g. 8~" hole f/12,180' to 12,240'.
f/12,233' to 12,240' (69 FPH). Circ. btms. up.
of gas off btm. Directiona11y drilled 8~" hole
12,301' while raising mud wt. to 80 PCF. Circ.
had 16 units of gas off bottom. Dropped survey
and Pooh. Had 1 tight spot @ 12,230'.
Had dr1g. break
Had 36 units
f/12,240' to
bottoms up -
instrument
,~' i' "
, " ¡, (, "I I'
"
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and n'lust be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
Form No. P-;4
'REV. 3-1-70
( SUBMIT IN DUPLICATE (
STATE OF ALASKA
S. API NUMERICAL CODE
OIL AND GAS CONSERVATION COMMITTEE
GAS 0
WELL
3. ADDRESS OF OPERATOR
MONTHLY REPORT OF DRilliNG
AND WORK OVER OPERATIONS
0
I.
OIL
WELL
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
4 LOCATION OF WELL
6. LEASE DESIGNATION AND SERIAL NO.
7. IF INDlAN'ALOTTEE OR TRIBE NAME
OTHER
8. UNIT FARM OR LEASE NAME
9. WELL NO.
TRAIL RIDGE UNIT #1
10. FIELD AND POOL, OR WILDCAT
I I. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
108
9/15/80
109
9/16/80
110
9/17/80
12,370'/69'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,370'/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,440'/70'
13 3/8" C. 4008'
9 5/8" C. 12,028'
SIGNED
14. I hereby certify that the foregomg IS true and correct
Finished Pooh w/bit #78RR. Rec. survey instrument. RIH w/bit
#80 on BHA #84 (45' belly). Directionally drilled 8~" hole
f/12,30l' to 12,337'. Had drlg. break f/12,332' to 12,337'
(30' - 45'/hr). Circ. bottoms up. Samples showed siltstone
w/small amounts of sand and 26 units of gas. Continued to
drill 8~" hole f/12,337' to 12,370'. Had drlg. break f/12,36l'
to 12,370' (30'/hr). Had influx of formation water while
drilling. (Mud wt. was cut f/80 PCF to 79 PCF). Circ. bottoms
up while raising mud wt. Samples showed sand w/interbedded
coal and siltstone. Pulled up to shoe of 9 5/8" egg. Circ.
and raised mud wt. to 82 PCF.
Circ. and condo mud. Raised mud wt. to 85+ PCF. Pooh w/d.p.
(down l~ hours to repair rotary table). Tested BOPE - Hydril
to 2500 psi and rams, Kelly cocks, and choke manifold to 5000
psi - OK. Installed bowl protector and RIH w/30' of 7~" x 4"
core barrel w/8~" x 4" core head.
Finished RIH w/core barrel #1 on BHA #85. Cut 4" core f/
12,370' to 12,400'. Pooh and rec. 29.8' of core. Layed down
core barrel. RIH w/bit #81 on BRA #86 (locked up assembly).
Reamed 60' to bottom. Directionally drilled 8~" hole f/12,400'
to 12,440'.
¡ :
(- ,
TITLE
DATE
NOTE- Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
Form No. P .4
REV. 3-1-70
( SUBMIT IN DUPLICATE (
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE S. API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
1.
OIL 0
WELL
GAS 0
WELL
7. IF INDlAN'ALOTIEE OR TRIBE NAME
OTHER
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
8. UNIT FARM OR LEASE NAME
9. WELL NO.
TRAIL RIDGE UNIT #1
; "
... , 10. FIELD AND POOL, OR WILDCAT
(,-
¡ '. t
( \
11. SEC. T. R. M. (BOTIOM HOLE
OBJECTIVE)
I'
", '01 ";'1.1:1
12. PERMIT NO.
I . , '). ~ "
. , " .
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
III
9/18/80
112
9/19/80
113
9/20/80
114
9/21/80
115
9/22/80
116
9/23/80
117
9/24/80
12,570'/130'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,649'/79'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,744'/95'
13 3/8" C. 4008'
9 5/8" C. 12,028'
12,901'/157'
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,038'/182'
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,189'/106'
13 3/8" C. 4008'
9 5/8" C. 12,028'
13,282'/93'
13 3/8" C. 4008'
9 5/8" C. 12,028'
14. I hereby certify that the foregOIng IS true and correct
Directiona11y drilled 8~" hole £/12,440' to 12,570'. Circ.
and Pooh. Had tight hole £/12,274' to 12,182'. RIH w/bit
#82 on BRA #87 (30' belly).
Finish RIH w/bit #82 on BRA #87 (30' belly). Reamed 60' to
bottom. Directiona11y drilled 8~" hole £/12,570' to 12,649'.
Made short trip. Had tight spots @ 12,556' and 12,475'.
Ran survey. Directiona11y drilled 8~" hole £/12,649' to
12,744'. Ran survey and Pooh. Had tight spots @ 12,608' and
12,513'. (NOTE: Stabilizers had clay packed around them).
RIH w/bit #83 on BRA #88.
Directiona11y drilled 8~" hole £/12,744' to 12,880'. Surveyed
and made 6 std. short trip. Trip was smooth. Directiona11y
drilled 8~" hole £/12,880' to 12,901'.
Directiona11y drilled 8~" hole £/12,901' to 12,973'. Ran
survey. Directiona11y drilled 8~" hole f/12,973' to 13,083'.
Directiona11y drilled 8~" hole £/13,083' to 13,096'. Surveyed
and made 8 std. short trip. Had 470M# drag on 1st 3 stds.
Directiona11y drilled 8~" hole £/13,096' to 13,189'. Dropped
survey and Pooh.
Pooh w/d.p. RIH w/bit #84 on BRA #88. Had no tight spots or
£i11. Directiona11y drilled 12~" hole £/13,189' to 13,282'.
TITLE
DATE
aTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
\
( SUBMIT IN DUPLICATE (
STATE OF ALASKA
5. API NUMERICAL CODE
OIL AND GAS CONSERVATION COMMITTEE
Form No. P-4
REV 3-1-70
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
1.
OIL 0
WELL
GAS D
WELL
OTHER
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT FARM OR LEASE NAME
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
6 LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN 'ALOTIEE OR TRIBE NAME
9 WELL NO.
TRAIL RIDGE UNIT #1
10. FIELD AND POOL, OR WILDCAT
II. SEC. T. R. M. (BOTIOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
118
9/25/80
13,294'/12'
13 3/8" C. 4008'
9 5/8" C. 12,028'
119
9/26/80
13,294'/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
r -,' :-~ ,..'. -
, i ,
pr,y (","" ~
" ' -~ ::'
, .
I
14. I hereby certify that the foregomg IS true and correct
SIGNED
Directionally drilled l2~" hole f/13,282' to 13,294'. Broke
rotary chain. Pooh for short trip while repair chain. Pulled
to 12,981' - tight hole. Picked up Kelly and circ. and
worked thru tight spot. Pulled to 12,401' w/460M# drag. Pipe
was stuck after standing back the 9th stand of d.p. P.U.
Kelly and circ. and jarred down w/40M#. (Circ. pressure
dropped from 2250 psi to 1600 psi @ 47 SPM). Pipe would not
move. Jarred up w/550M# - pipe would not move. Rigged up
S.D.C. and RIH w/GO W.L. Spinner survey to check for d.p.
washout. Logged up from 12,377' to surface w/spinner survey.
Survey indicated all fluid going out the bit. R.D. GO W.L.
R.U. Dialog string shot and CCL on SDC.
Repaired S.D.C. W.L. unit. RIH w/Dialog CCL & back-off charge
to 295'. Backed-off d.p. @ 295'. Pooh w/9 jts. of d.p.
Lay~d down 1 jt. RIH w/8 jts. of d.p. & 1 - 15' pup jt. P.U.
Kelly & scrwed into fish @ 295'. R.U. Howco & broke circ.
Now have 2100 psi w/47 SPM. Pumped 5bbls. water, 5 bbls. die-
sel, 60 bbls. black magic - SFT pill, 2 bbls. diesel, 2 bb1s.
water, & 157 bbls. mud. (Have 15 bb1s. of pill outside d.p.
and 45 bbls. of pill inside d.p.). Jarred on d.p. (up w/525M#
& down w/140M#) for 15 min. every 30 min. Plugged d.p. after
4 hours - held 2000 psi. R.U. Dialog & RIH w/CCL, free-point
indicator, and back-off charge. Found free-point in x-over
below 6 1/4" Johnston jars @ 12,153' (D.C. 's below x-over
showed 25% free). Had P.U. of 4l0M#, slack-off of l70M#.
Pooh w/W.L. Pulled d.p. to shoe of csg. Could not circ. down
d.p. Reversed out pill from,d.p.
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
( SUBMIT IN DUPLICATE (
STATE OF ALASKA
5. API NUMERICAL CODE
OIL AND GAS CONSERVATION COMMITTEE
Form No. P:;-4
R[V 3-1-70
6. LEASE DESIGNATION AND SERIAL NO.
MONTHLY REPORT OF DRilliNG
AND WORKOVER OPERATIONS
1.
OIL 0
WELL
2. NAME OF OPERATOR
GAS 0
WELL
7. IF INDIAN .ALOTTEE OR TRIBE NAME
OTHER
8. UNIT F ARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
9. WELL NO.
TRAIL RIDGE UNIT #1
10. FIELD AND POOL, OR WILDCAT
11 SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
120
9/27/80
13,294'/0'
13 3/8" C. 4008'
9 5/8" C.12,028'
121
9/28/80
13,294'/0'
13 3/8" C. 4008'
9 5/8" C.12,028'
122
9/29/80
13,294'/0'
13 3/8" C. 4008'
9 5/8" C. 12,028'
í~ f" ", - (~I
d '- \ - ~,' ~
r
~ '"
f' .)'
14. I hereby certify that the foregoIng IS true and correct
SIGNED
Finished reversing out pill & Pooh w/d.p. Recovered entire
drill string. RIH w/bit#85 on BRA #89 (locked-up assembly).
Cleaned and doped each connection on BRA on trip in. Circ.
and condo mud @ 12,000'. Raised mud wt. to 96 PCF.
Finished conditioning mud and reamed hole f/12,028' to
12,350'. Had high torque & rotary chain broke. Pulled up
to shoe of csg. and repaired rotary chain. RIH & reamed f/
12,350' to 12,557'. Rotary clutch failed. Pulled to csg.
shoe & replaced pads on rotary clutch. RIH and reamed f/
12,557' to 13,140'.
Continued reaming f/13,140' to 13,200'. Pipe torqued up
and drill string parted high. P.U. 1 jt. and screwed
back into box. Pulled up and pipe parted w/250M#. Screwed
back into box and pressured up - pipe held 3000 psi. P.U. w/
d.p. and pipe parted @ 250M# pull. Pooh. RIH w/7 5/8" 0.5.
w/6~" grapple on 9 jts. HWDP, 1 jt. 5-135 d.p. and 1 - 15' pup
jt. Picked up Kelly and worked over top of fish @ 361'. RIH
w/Dia10g CCL and string shot. While torquing to the left the
d.p. backed off. Pooh. Found d.p. backed off on top of 0.5.
RIH w/d.p. and screwed into 0.5. Released 0.5. and Pooh.
RIH w/7 5/8" 0.5. and 6 3/8" grapple - could not latch onto
fish. Pooh. RIH w/6~" grapple and latched onto fish @ 361'.
RIH w/Dialog CCL and string shot. Made backoff @ 982'. Pooh
w/W.L. and d.p. Layed down 0.5. and 2 bad joints (tool joint
box showed some pulled threads but no external damage). RIH
w/S-135 d.p. and screwed into fish @ 982'. Jarred up on fish
- pipe would not move. Torques pipe to the right and jarred
down - pipe came free after 3rd time. Had pick up of 535M#.
Pooh w/d.p. Break,clean,dope & retorque each connection.
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form Np. P'l-4
ÎtEV 3-1-70
( SUBMIT IN DUPLICATE (
STATE OF ALASKA
5. API NUMERICAL CODE
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORK 0 VEl OPERATIONS
0
6. LEASE DESIGNATION AND SERIAL NO.
I.
OIL
WELL
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
GAS 0
WELL
7. IF INDlAN'AWTIEE OR TRIBE NAME
OTHER
8. UNIT FARM OR LEASE NAME
3. ADDRESS OF OPERATOR
9. WELL NO.
TRAIL RIDGE UNIT #1
4. LOCATION OF WELL
10. FIELD AND POOL, OR WILDCAT
11. SEC. T. R. M. (BOTIOM HOLE
OBJECfIVE)
12. PERMIT NO.
13. REPORT TOTAL DEnH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEnH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
123
9/30/80
13,306'/12'
13 3/8" C. 4008'
9 5/8" C. 12,028'
Finished Pooh. Laid down all grade "E" d.p. and 3 - 6~"
steel D.C.'s. Cleaned bit and changed jets. RIH w/bit #85RR
on BRA #90. Picked up new 8-135 d.p. on top of X-95 d.p. to
replace "E" and 3 - D.C.'s. RIH to shoe of 9 5/8" esg. and
broke circ. RIH to 13,183'. Reamed f/13,183' to 13,294'.
Directional1y drilled 8~" hole f/13,294' to 13,306'.
f"" (0' <.-
! .
\ "
I""
-
14. I hereby certify that the foregoIng IS true and correct
SIGNED
TITLE
DATE
NOTE- Report on this form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
,.-
~
.
..
i -
I
I
t
I
\c
!
I..
¡
~
IS
i
,
~
:0-
!
",."" -'
- .../,'
H~H~ I S113HS
-
09 - \0 - '0
'O:'C:)
,00<;0)
: .If''l:lW:¡1':) :jQ
~oOh
I
-"- r'
I
UYO
3l~S
"O.l4Y
NMY10
\
\0") "" ' S \:t:>
ì
--:>
.> tð/s tQ
ðO~
'.1.53
.. ~/~ ~ \
V'N~rC>-JIlY::> ~O ÅNVd~OJ 110 NOINn
1.
""\ "'\ 31"\
¡
r--
"
. ,
. -
" ..
,
.. "
- .
. "
..
0 - '
0
0 <> 0
C C 0
Cì 0, 0 -
0.
C 0
0
0 +-
Q
0
0
0
o~
0
<)
o~
0
;> -
.... .
.
..
.
..
, "
. .
"
. \,.
->
.1.\.N n
'<
.
"':i~<;1~"ð :\~~ l
--.....
\
. .
. -
- "
. .
, .
.'
,
...
,
. ..
,
-
0 0
0 C
Q 0
a.
- .
. G
0 0
.. .
a
Q.
Q
, 0 Q 0
~O 00
0 0 0
0
~~ 00
.... 0 Q. q
-
..
."
, ..
\
;
,
..
4 "
'J'J""..:11"<¡{P""H;).:t
.-' -..
~
I
~lVO
-"31
r"
-
'--
0
4
"S""~^""c:.>
"::s..1.'1 ~..wo"\...".o ")
: ,..0 \~"'-"4~O~
(
S<3'~"~
.., ~çC;;ðç'Q
....
)
\Ii..
f
..
Form IG-403
REV. 1-10-73
('
Submit "Intentlons" In Triplicate
&I "Subsequent Reports" In Duplicate
('
STATE OF ALASKA (\ I ,
., L \
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS~ ~it.[~J~
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMITr:'-~.f~ ~C;h proposal5.)
OIL D GAS Q
WELL WELL OTHER
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
5. API NUMERICAL CODE
50-283-20065
6. LEASE DESIGNATION AND SERIAL NO.
ADL 1156870
1.
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
TRAIL RIDGE UNIT
3. ADDRESS OF OPERATOR
P.O. BOX 6247, ANCHORAGE, ALASKA
99502
9. WELL NO.
TRAIL RIDGE UNIT #1
4. LOCATION OF WELL
AtSUrfacel069.58'S & '329.03'W of the N.E. Cor., Sec. 9,
T20N, R10W, S.M.
10. FIELD AND POOL, OR WILDCAT
WILDCAT
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
13. ELEVATIONS (Show whether OF, RT, GR, ete.)
216.6' Above MSL
Sec. 3, T20N, R10W, S.M.
12. PERMIT NO.
79-72
14.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
-
WATER SHUT-OFF
FRACTURE TREATMENT
SHOOTING OR ACIDIZING
(Other)
(NOTE: Report results of multiple completion on Well
- Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work.
TEST WATER SHUT-QFF PULL OR ALTER CASING
FRACTURE TREAT MULTIPLE COMPLETE
SHOOT OR ACIDIZE ABANDON*
REPAIR WELL CHANGE PLANS
----
(Other) Inject Drilling Fluids
REPAI RING WELL
ALTERING CASING
ABANDONMENT*
It is desired to dispose of any remaining drilling or workover fluids
by injection down the annulus of the 9 5/8" casing and 13 3/8" casing
at our Trail Ridge Unit #1 well. This injection would be limited to
a depth range of between 400O' (shoe of 13 3/8" csg.) and + 650O' (top
of cement around 9 5/8" csg.) The formation to be injected into is a
recently deposited cong10meritic gravel w/some sand inter-bedding.
There is no evidence of the existence of fresh water. The fluids involved
would be clay-based drilling fluids and, possibly, polymer-based workover
fluids. The maximum pressure that would be attained
would be 3000 psi with a maximum total fluids volume of approximately
20,000 bbls. This would essentially be a one step operation wherein
the fluids would be injected once and the annulus would be shut-in and
secured. The basic advantage of using this method of disposal over
other available methods is the cost savings which could amount to over
$75,000. ,I
~~equent Work Reported
on Form No. . - Dated -1--'-
16. I hereby certify that the foregoing Is true and correct
\ .. () 0(\0 f.. D Dist. Dr1g. Supt.
SIGNED ~)l~ \<..... nV Q-'\þA}OA- I J)TITLE
~ (J /,:J COMMISSION"""
~~~~~~I~~~~F APPROVAL, IF AN~DtffLõ;: THE COMMISSION DATE
Camnission approval is for Iœchanical use of the æll to dispose of fluids.
approve the disposal of fluids into these fonœtions.
See Instructions On Reverse Side
9/10/80
DATE
Cj );1-/80
Only DEe can
Approvsd ~opy
Returned
J' /r- -¥F (!J
----
anI y DEe can
I ApprOV8d rOD';
Re.vf :1
~ .z!~
r::='j)rm 1Q..403
,'EV. 1-1?-73
(Submit Ulntèntlons" In Triplicate (
&I "Subsequent Reports" In Duplicate
í)C-~¡¡{ ~-
STATE OF ALASKA !'\ r: \. L ì ì;, f > ~.r 5. API NUMERICAL CODE
50-283-20065
OIL AND GAS CONSERVATION COMMITT~ r 1
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drll~~j:8o:d~e~
Use "APPLICATION FOR PERMIT-" for sù¿fi p;oP'osarì.),
í 1900
6. LEASE DESIGNATION AND SER IAL NO.
ADL 1156870
1.
( ,I, .
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
OIL 0 GAS Q
WELL WELL OTHER
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT, FARM OR LEASE NAME
TRAIL RIDGE UNIT
9. WELL NO.
TRAIL RIDGE UNIT 111
3. ADDRESS OF OPERATOR
P.O. BOX 6247, ANCHORAGE, ALASKA
99502
4. LOCATION OF WELL
Atsurfacel069.58'S & '329.03'W of the N.E. Cor., Sec. 9,
T20N, RlOW, S.M.
10. FIELD AND POOL, OR WILDCAT
WILDCAT
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
216.6' Above MSL
Sec. 3, T20N, RlOW, S.M.
12. PERMIT NO.
79-72
14.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
-
~
TEST WATER SHUT -OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other) Inj ec t
PULL OR ALTER CASING WATER SHUT-oFF
-
MULTIPLE COMPLETE FRACTURE TREATMENT
ABANDON* SHOOTING OR ACIDIZING
- CHANGE PLANS (Other)
Drilling Fluids (NOTEI Report results of multiple completion on Well
- Completion or Recompletlon Report and Log form.)
15. DESC~IBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
REPAIRING WELL
ALTERING CASING
ABANDONMENT*
It is desired to dispose of any remaining drilling or workover fluids
by injection down the annulus of the 9 5/8" casing and 13 3/8" casing
at our Trail Ridge Unit III well. This injection would be limited to
a depth range of between 4000' (shoe of 13 3/8" csg.) and + 6500' (top
of cement around 9 5/8" csg.) The formation to be injected into is a
recently deposited conglomeritic gravel w/some sand inter-bedding.
There is no evidence of the existence of fresh water. The fluids involved
would be clay-based drilling fluids and, possibly, polymer-based workover
fluids. The maximum pressure that would be attained
would be 3000 psi with a maximum total fluids volume of approximately
20,000 bbls. This would essentially be a one step operation wherein
the fluids would be injected once and the annulus would be shut-in and
secured. The basic advantage of using this method of disposal over
other available methods is the cost savings which could amount to over
$75,000.
\
16. I hereby certify that the foregoing Is true and correct
SIGNED ~:- R. 000 ..Ji'v6;ß TITLE
(This space for State offl use) ()
'l~ ~
APPROVED BY TITLE
CONDITIONS OF PROVAL, IF A Y: BY ORDE::t OF THE COMMISSION
Canrnission approval is for ræchanical use of the well to dispose of fluids.
approve the disposal of fluids into these formations.
See Instructions On Reverse Side
9/10/80
Dist. Drlg. Supt.
DATE
'1/Í-¿ Jæ;
C 0 11 ~~A: IS S ION E R
DATE
;tlIr/
}
¿(£
L
1
13",
~
1))
j~'1
-
- . ------- -- - --- --------
-- -- ----- - .---- -
-- - --- -- - ---- - -
.
(
Submit "Intentlons" In Triplicate
& "Subsequent Reports" In Duplicate
(
Form 1~403
REV. 1-1~73
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
5. API NUMERICAL CODE
50-283-10061)
6. LEASE DESIGNATION AND SER IAL NO.
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT""" for such proposals.)
1. OIL 0 GAS n
WELL WELL. ~ OTHER
2. NAME OF OPERATOR
ADL 1156870
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
P.O. BOX 6247, ANCHORAGE, ALASKA
8. UNIT, FARM OR LEASE NAME
TRAIL RIDGE UNIT
99502
9. WELL NO.
TRAIL RIDGE UNIT #1
4. LOCATION OF WELL
Mwrl~e 1069.58'S & 329.03'W of the N.E. Cor., Sec.
9, T20N, RlOW, S.M.
10. FIELD AND POOL, OR WILDCAT
WILDCAT
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 3, T20N, R10W, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
12. PERM IT NO.
14.
216.6' above MSL
Check Appropriate Box To Indicate NatUre of Notice, Report, or Other Data
79-72
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
,.--
CHANG E PLANS
WATER SHUT-DFF REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT.
(Other) change in g-:;-¡ 8" csg. point
TEST WATER SHUT-DFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAI R WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON.
-
(NOTE: Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all ~rtlnent details. and give pertinent dates, Including estimated date of
starting any proposed work.
Due to hole conditions it was necessary to run 291 jts. of 47# N-80 and S-95 9 5/8"
csg. to 12,028' and cmt. with 1200 sx. of class "G".
ú.Æ/ I ~/~ I/e ¿
<l.>òo s¡/ 9% /S;..!.~o' I"\D
'} I go 'ê) v ,M.b
~
!o J'
/~OQ /v£)
/~ oùÙ 7iJD
I"'" "" J,'1(\:r'¡
r- ~ ',,' )" j
. '. ¿. '" I. ! " . '-.
Verbal approval received from Jim Trimble 8/29/80.
SEP 1 0 1geo
u\.. 1'llI~';!OII
AI"<'k-:.J 011 & \.J ~ . II,>
.....;..u -
Anchuraga
16. I hereby certify that the foregoing Is true and correct
SIGNED ~;- ~. 0.. ~ hf,TITLE
(This space for State. office use)
Dist. Drlg. Supt.
DATE
9/8/80
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE
DATE
See Instructions On Reverse Side
Form No. 10~04
ftEV 3-1-70
, '" . . ' " ~ r-~ ~ ~ ~ ~1¿:r~ n ! ~, ~ fÞ'/
( ~ AI~E ~ r ~~~ H 'r. r} r~ \\ ~ ;J t'~ I '; K
STATE OF ALASKA ~ ~ ~: ~ \ ~ ~l~ ~:.~ :~. r~ ~~ \~) :~ ~i.. ' , -r~
OIL AND GAS CONSERVATION COMMIT1\ij'U B '~ ,5. Attfs~~A \l ~ ~-' . ,:, y
MONTHLY REPORT OF DRILLING 6 LEASE DESIGNATION AND SERIAL NO. t...~
AND WORKOVER OPERATIONS ADL 1156870
0
GAS r;;1
WELL lA.J
7. IF INDlAN'ALOTTEE OR TRIBE NAME
:t
~
~
l.
OIL
WELL
2. NAME OF OPERATOR
OTHER
8. UNIT FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
1068.5l'S & 38l.5l'W of the N.E. Cor., Sec. 9, T20N,
RlOW, S.M.
Wi 1 ò(':=tt
11. SEe. T R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 3, T20N, R10W, S.M.
---- -
/1"" ~ ').--
(- ,/
9 WELL NO.
P.O. Box 6247, Anchorage, Alaska
4. LOCATION OF WELL
99502
TRAIL RIDGE UNIT III
10. FIELD AND POOL. OR WILDCAT
12. PERMIT NO
7q-7?
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
63
8/1/80
10,058'/508' Directionally drld. l2~" hole f/9550' to 9561'. Made 24 stand
20" C. 982' wiper trip. Pulled tight 1st 8 stands. RIH - OK. Direction-
13 3/8"C.4008' ally drld. l2!t;" hole f/956l' to 10,058'. Pooh - tight 1st 5
stands.
64
8/2/80
10,687Î629' Finish Pooh. RIH w/bit 1166 on BRA 1164 (angle-building
20" C. 982' assembly). Directionally drld. l2!t;" hole f/10,058' to 10,687'.
l33/8"C.4008'
65
8/3/80
10,754Î67'
20"C.982'
l33/8"C.4008'
Directionally drld l2!t;" hole f/10,687' to 10,754'. Pooh.
Drill pipe parted at the surface with 2 stands out of the hole.
(Pipe parted at base of 180 taper below the tool joint). RIH
w/overshot and grapple and tagged top of fish @ 251'. Latched
onto fish, checked weight, and broke circ. - had 1 jet-plugged.
Circ. @ 24 SPM w/2400 psi. Circ. and jarred on stuck D.P.
w/375MII. Set kelly back and TIH w/W.L. to retri~ve survey
instrument - could not rec. P.U. kelly and cont. to circ. ~
and jar on pipe. Mixed 60 bbls. of bl~k.magic - SFT pill.
Pumped 21 bbls H2O, 7 bbls. diesel, 6Ó'bbls. SFT pill, 2 bbls.
diesel, 5 bbls. H2O, and 150 bbls. mud. (Have 40 bbl. pill
outside pipe and 20 bbls. inside). Pill in place @ 10:00 PM.
Pumped 1 bbl. per hour and worked jars for 10 min. every 1/2
hour.
RECEIVED
SEP ,.. 9 1900)
t I':.:::;~a 0\1 ßl GdS (,dll~ LOlnrmS(jlOn
Anchoragt
14. I hereby cer ICy at the fOpeg ~s and correct ,
, ~ ~~~ ~ ~ ~ D1St. Drlg. Supt.
SIGNED ""A'J..LfJ~.L("A./"'.,"nTLE
DATE
9/5/80
NOTE-Report on this form IS required for each calendar month" regardless of the status of operations" and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month"unless otherwise directed.
\
Form No 10404
-REV 3.1-70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
S. API NUMERJCAL CODE
MONTHLY REPORT OF DRilliNG
AND WORK OVER OPERATIONS
0 GAS r:J
WELL l..1!I
6. LEASE DESIGNATION AND SERIAL NO
1.
OIL
WELL
7. IF INDIAN ALOTTEE OR TRIBE NAME
OTHER
2. NAME OF OPERATOR
8. UNIT FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERA TOR
9. WELL NO.
4. LOCATION OF \\ELL
TRATT. R TDGE UNTT III
10 FIELD AND POOL, OR WILDCAT
11. SEe. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPTH AT END Of \fONTH, CHANGES IN HOLE SIZE, CASING AND CEME1'IíTING JOBS INCLUDING DEPTH
SET AJ'IoD VOLlJ\ŒS USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUI';K IN HOLE AND SIDE.TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
66
8/4/80
10,754'/0'
20" C. 982'
133/8"C.4008'
Continued jarring on D.P. Working pipe f/lOOM# to 375M# while
moving SFT pill 1 bbl. every hour. Rigged up S.D.C. and
Dialog. RIH w/f~ee-point indicator, CCL, and 600 gr. shot.
Tools stopped @ 10,357' (33rd jt. of HWDP). Pooh. RIH wI
1 5/8" bar - could not work past 10,357'. Pooh. RIH w/
1~" CCL and 500 gr. charge. Worked thru bad spot @ 10,357'.
Checked collars and torqued pipe for backoff.
67
8/5/80
10,754'/0'
T.O.F.lO,565'
20"C.982'
l33/8"C.4008'
Worked left-hand torque into drill pipe. Backed-off drill pipe
@ 10,565' (In x-over above D.C. 's). Left 188.81' of fish in
hole. Pooh w/W.L. Pulled 7 jts. and layed down overshot and
fish. P.D. Kelly and circ. bottoms up - returns were clean.
Pooh layed down drill pipe. Repaired rotary table. P.D. l2!z;"
bit #64RR on BRA #65 (clean-out assembly). M.D. and RJH w/new
drill pipe.
68
8/6/80
10,754'/0'
10,565' T.O.F.
20"C.982'
133/8"C.4008'
RIH w/bit #64RR on BRA #65. P. D. and break-in new "E" drill K:,t
pipe. Had accident on rig floor (Floorhand hit by rig tongs)~
Rig down 6 hours due to accident. Resumed rig operations at ~
11:30 a.m. Continued to pick up and break-in new drill pipe.
Have a total of 130 jts. of "E", 130 jts. of "X-95", and 5 jts.
of "S-135" drill pipe.
R~ ,.... ","" ,.-
"~I';, tl':¡"'",
\. . . \,~. ~
..\. V' U.
"
sz p.. 9 ~~taO,
t.I::.:;:~: .)11 81 (. --; ¡
i.J , . ¡II') l..Jt,dl.fI!' <.)fÚfl
A.nt!lO[ar~
14. I hereby certify that the foregoing IS true and correct
SIGNED
TITLE
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No. 10404
JŒV 3-1-70
(
SUBMIT IN DUPLICATE
('
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0 GAS L1
WELL ~
I.
OIL
WELL
OTHER
UNION OIL COMPANY OF CALIFORNIA
8- UNIT FARM OR LEASE NAME
2. NAME OF OPERATOR
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
S. API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN ALOTTEE OR TRIBE NAME
9 WELL NO.
TRAIL RIDGE UNIT #1
r I . - 1"'. , . ..
'¡ , \,
, ,¡' '. :~,
. - ~ , '.
10. FIELD AND POOL. OR WILDCAT
~ :-j' ì. (¡ ~flr)f1
<..I ,'" ~,.
11. SEe. T. R. M (BOTIOM HOLE
OBJECTIVE)
t Ir II"
,I '. , \. (.\1' -, ,l", ", ,,"'~.l8fIPERMITNO
'~.¡ìi)!h..r a¡ ?
13. REPORT TOTAL DEPTH AT END OF MONTH. CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED. PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
69
8/7/80
10,754'/0'
10,565' T.O.F.
20"C.982'
133/8"C.4008'
70
8/8/80
10,565' TOF
10,225' KOP
20"C.982'
133/8"C.4008'
71
8/9/80
10,565' TOF
10,225' KOP
20"C. 982' -
133/8"C.4008'
72
8/10/80
10,565' TOF
10,225' KOP
20"C.982'
133/8"C.4008'
14. I hereby certify that the foregOIng IS true and correct
SIGNED
Continue to pick up 8-135 drill pipe. Reamed down f/9700' to
10,565'. Circ. at 10,565'. Pressure dropped f/2300 psi @ 47
8PM to 2050 psi @'55 8PM. Pooh looking for washout. Had
tight hole. Had to work thru spots at 10,544' and 10,472'.
Found washout in slip area of 18th joint of 8-135 drill pipe
(+ 530' down). RIH and circ. hole clean @ 10,565'. Pooh. M.U.
and RIH w/610' of 3" tubing stinger on 5" drill pipe.
Completed picking up and RIH w/tubing stinger, plug catcher,
and drill pipe. Hung at 10,562' (3' above fish). Pumped 20
bb1s. water, 300 sx. c1. "G" cmt. w/l% CFR-2, .1% HR-7, and
10% sand. Dropped wiper plug and displaced cmt. w/2.5 bbls.
water and 182 bbls. mud. Did not bump plug. CIP @ 07:15 hrs.
8/8/80. Pulled 6 stands and pumped 20 bbls. - did not Dump
plug. Pooh. Did not find plug in plug catcher. Test BOPE -
OK. RIH w/bit #61RR on BRA #66 (clean-out assembly). WOC.
RIH w/D.P. Found plug in 57th stand of D.P. Tagged top of plug
@ 10,214'. Polished firm plug to 10,225'. Circ. clean and
Pooh. Changed out old 8-135 D.P. with new 8-135 D.P. RIH w/
bit #67 on BRA #67 for Dyna-Drill Run #17. Oriented tool face
1500 left of high side. - -- -
Dyna-drilled l2~" hole
to act sticky. Pooh.
pendulum assembly) and
to 10,296'. Circ. and
f/lO,225' to 10,255'. Dyna-Drill began
RIH w/bit #68 on BRA #68 on BRA #68 (30'
directionally drilled l2~" hole f/lO,255'
survey.
TITLE
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10'404
REV 3.1.70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
I.
OIL
WELL
GAS IVl
WELL LÃJ
OTHER
UNION OIL COMPANY OF CALIFORNIA
8. UNIT FARM OR lEASE NAME
2. 1'1, A \IE OF OPERATOR
3 ADDRESS OF OPERATOR
4 LOCA TlO'l OF \\ ELL
5. API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN ALOTTEE OR TRIBE NAME
9 WELL NO.
TRAIL RIDGE UNIT #1
10. FIELD AND POOL. OR WILDCAT
II. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF \fONTH, CHANGES IN HOLE SIZE, CASING AND CEME~TING JOBS INCLUDING DEPTH
SET AND VOLUMES USED. PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
73
8/11/80
10,553'/257'
10,565' T.O.F.
10,225' KOP
20"C.9B2'
133/B"C.400B'
74
B/12/BO
10,553'/0'
10,565' TOF
10,225' KOP
20"C.982'
133/8"C.400B'
14. I hereby certify that the foregoIng IS true and correct
SIGNED
Ran survey @ 10,265'. Pooh. RIH on bit #69 on BRA #69 (ang1e-
building assembly) and reamed f/10,200' to 10,296'. Direction-
ally drilled l2~",hole f/lO,296' to 10,553'. Hole showed high
torque f/lO,520' to 10,533'. Had 400M# pick up weight to make
a connection. Pooh for short trip - had excessive drag for
400'. Put on Kelly to work thru tight spot at + 10,150'.
Completed Pooh. (Had 375 to 400M# off btm. reducing to 325
to 335M# after pulling 6 2/3 stds., balance of trip out OK).
Cleaned hard packed clay from stabilizers. RIH w/BHA #69 &
bit #69. Reamed f/l02l0' to 10302' working each single the
full length of Kelly after each one was reamed down. Torque
running between 330 & 390 & hole very tight. Had 400M# pick
up wt. after reaming to 10302'. Pulled out of tight area
coming out @ 10225' (top of D.D. run). Pulled out to 9930'.
Hole condo good f/10225' to 9930'. Run back in & reamed f/
10180' to 10210' and torque indicator broke. Pulled up to
9930' & repaired torque indicator. (Down 4 hrs. for repair).
RIH to 10107' & started reaming. Reamed f/10l07' to 10393'
& broke torque indicator again. Pulled up to 9930'. Had
365M# max. hook load coming up.
R. E~ ll'" [. I \Jt !: ~~~;
b .." L i ¡~
SP" PJ 9 1f)pr
t -, ."",.."
II ¡,..f', ',c "11' ~, G ~, ' <l. ,y"",,'
rl! "".,,¡. '"
j,!,¡K1¡';I?Ç"
"
TITLE
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise dIrected.
Form No 10404
REV 3-1-70
(
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0 GAS nn
WELL t:.:.I
1. OIL
WELL
OTHER
UNION OIL COMPANY OF CALIFORNIA
2. NAME OF OPERATOR
3 ADDRESS OF OPERA TOR
4. LOCATION OF \\ElL
(
S. API NUMERICAL CODE
6 LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
9. WELL NO
TRAIL RIDGE UNIT #1
10 FIELD AND POOL, OR WILDCAT
11. SEe. T R M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHAl'tGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE.TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
75
8/13/80
10,553'/0'
10,565' T.O.F.
10,225'KOP
20"C.982'
l33/8"C.4008'
76
8/14/80
10,830'/277'
10,565' TOF
10,225' KOP
20"C.982'
l33/8"C.4008'
14. 1 hereby certify that the foregoing IS true and conect
SIGNED
Pooh w/8 stds. of d.p. Repaired rotary torque cylinder and
gauge (Down 4~ hrs. for repair). RIH. Reamed f/lO,433' to
10,489'. While reaming @ 10,489' drill pipe parted at 1226'
in new X-95 drill'pipe (pin failure). Pipe fell 64' to bottom.
Pooh w/d.p. RIH w/IO 3/4" O.S. w/6 3/8" grapple and pack-off.
Strapped into hole and latched onto fish @ 1308'. Checked
weight and tried to break circ. - packoff failed. Picked up
to 200M# to pull slack out of pipe - top of fish now @ 1294',
bit at 10,553' T.D. Worked torque into d.p. and found travel
in both sets of jars. Jarred on pipe. Pipe pulled free @
425M#. Pulled out and layed down O.S. and bad joint. P.U.
Kelly and circ. 1/2 hrs. Pooh. Layed down 8 jts. of bent
"E" d.p. Found 2nd joint of HWDP almost unscrewed. Ran
back in hole f/bit #70 on BRA #69 to top of HWDP. Pooh
laying down 38 jts. of HWDP.
P.U. and broke in 40 jts. of HWDP on BRA #70. Laid down 6
more joints of "E" d.p.(a total of 14 joints laid down) and
1 "X-95" joint. RIH to 6500' and circ. RIH and reamed f/lO,4l5
to 10,553'. Directionally drilled l2~" hole f/lO,553' to
10,830'. Stuck drill pipe while rotating to bottom after
connection. Worked pipe f/350M# to 430M#. Worked torque out
of drill pipe and jarred on pipe (Jars hitting @ 375M#).
Working jars 10 min. and down 30 min. L,""",.1 r-- Þ"" ¡:~ ~ ','- ..~
r\.IIr~¡ v .~\:¡¡ .
. l- "- L I I' ," ¡
I, I" I....
TITLE
(\ r ",,", (ì 'f" .,. .,..
""'I".~~'V!,.¡t',.
VI.- v ,.-,
f:":;.~.: ]1 i5>. (..~ . ,
,.,~ '..
C','
t ,\'"It ,~) ';or'"
. ~ ~ . ¡
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeedIng month, unless otherwIse directed.
Form No It;.. ,~
.REV 3.1.70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRilliNG
AND WORKOVER OPERATIONS
0 GAS ¡:;;'l
WELL IAJ
I.
OIL
WELL
2. NAME OF OPERATOR
3 ADDRESS OF OPERATOR
4 LOCATION OF ~ELL
OTHER
S. API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO
7 IF INDIAN ALOTTEE OR TRIBE NAME
UNION OIL COMPANY OF CALIFORNIA
8 UNIT FARM OR LEASE NAME
~, ~~ ...
I . " '; r
'.. I ,.
9. WELL NO
TRAIL RIDGE UNIT #1
10. FIELD AND POOL. OR WILDCAT
,
,
,
C" .... .
\ L :
n í"~t"~
;:.)
11 SEe. T. R M (BOTTOM HOLE
OBJECTIVE)
fi"',.'" ,.,.' " ,. , uL.¡¡ 'f '.~IÍJ1} PERMIT NO
¡ .Ill !1w'~ ?;l;:
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMEI'\ITlNG JOBS INCLUDING DEPTH
SET AND VOLUMES USED. PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
77
8/15/80
78
8/16/80
79
8/17/80
80
8/18/80
10,830'/0'
20"C.982'
l33/8"C.4008'
Jarred on d.p. mix 60 bbls. of black magic - SFT pill. Spot
30 bbls. outside pipe and 30 bbls. inside pipe. Move 1 bbl.
of SFT every hour. Working d.p. up to 425M#. Have travel in
both sets of jars~ Only top set of jars hitting.
10,830'/0' Continue jarring on stuck pipe for 10 min. every ~ hr.
20"C. 982' 1 bbl. SFT every 2 hours. Work pipe up to 450M#.
l33/8"C.4008'
10,830'/0'
20"C. 982'
l33/8"C.4008'
10,830'/0'
10,678' T.O.F.
20"C.982'
l33/8"C.4008'
SIGNED
14. I hereby certify that the foregolßg IS true and correct
Move
, Move 1 bbl. SFT every 3 hours - pill spotted for 48 hrs. Rig-
ged up SDC and dialog. TIH w/CCL, free point indicator, and
1200 gr. shot. Found stretch down to 10,785' and torque down
to 10,683'. Worked 9 rounds of left-hand torque into d.p. and
shot charge at 10,720' - no back-off. Pooh w/W.L. TIH w/CCL
and 900 gr. shot. Worked 9 rounds of left hand torque into dop
and shot @ 10,607'. Pipe backed offo Had P.U. wto of-380M#.
Pooh w/W.L. Pooh w/d.p.
Pooh w/d.p. and layed down fish. Rec. HWDP, 6~" jars, keyseat
wiper, x-over, stab., 1 steel D.C., portion of 7 3/4" jars.
(Unscrewed from btm. sub in 7 3/4" jars). Total length of fish
is 152'. Top of fish @ 10,678'. RIH w/IO 5/8" O.S. and 7 3/4"
grapple, 7 3/4" B.S., 7 3/4" oil jars, 4 - 8" D.C.'s, 7 3/4"
accelerator, and 39 jts. HWDP to 4000'. Pooh to change exten-
sion on O.S. RIH to 10,678' 0 P.U. Kelly and worked over top
of fish. Had pump pressure increase, then decrease. Packoff
in O.S. would not hold. PoU. to 450M# and O.S. pulled free.
Worked over fish 4 times - would not hold. Pulled up above
fish and circ. and condo mud.
TITLE
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10404
..;{EV 3-1.70
(
SUBMIT IN DUPLICATE
('
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0 GAS n
WELL IK.J
OIL
WELL
2 J'o:AME OF OPERATOR
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
OTHER
S. API NUMERJCAL CODE
6. LEASE DESIGI'IiATION AND SERIAL NO.
7. IF INDIAN ALOTTEE OR TRIBE NAME
8. UNIT FAR\! OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
9. WELL NO. UNIT '¡~l
TRAIL RIDGE 11
10. FIELD AND POOL. OR WILDCAT
II. SEC. T R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPrH AT END OF MONTH. CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPrH
SET AND VOLUMES USED, PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
81
8/19/80
82
S/20/80
83
8/21/80
10,830'/0'
10,678' T.O.F.
20"C.982'
l33/8"C.4008'
10,830'/0'
10,678' TOF
20"C.982'
l33/8"C.4008'
10,830'/0'
10,678' T.O.F.
20" C.982'
l33/8"C.4008'
SIGNED
14. I hereby certify that the foregoing IS true and correct
Finished Pooh w/D.P. Redressed O.S. w/7 3/4" grapple & mill
control. RIH to 10,670'. Broke circ. to clear O.S. Worked
over fish @ 10,678'. Checked P.U. wt. & set grapple. Jarred
on fish 5 hours ~ did not move. R.U. Dialog on SDC line. RIH
w/1200 gr. shot, FPI, and CCL. Tools stopped at 10,678'.
Could not get into top of fish. Pooh w/W.L. P.U. Kelly & put
2000 psi on D.P. Worked 7 rounds of left-hand torque into
pipe - list torque & pressure. P.U. to check wt. - had 300M#
(Indicates back off in HWDP). Set down & screwed into con-
nection. Torqued up pipe 3 times & grapple released. Had
P.U. wt. of 350M#. Pooh w/D.P. Found loose connection
between HWDP & x-over above collars. Layed down fishing
tools. Made up BRA #72.
RIH w/bit #71 on BRA #72 (clean out assembly) to top of fish
@ 10,678'. Circ. and condo mud (add 1 PPB fresh gel). Pooh-
hole in good shape. Rigged up Schlumberger. RIH w/DIL-SONIC
log to 10,625' (logged while RIH). Pooh - running DIL-SONIC
log.
Completed running DIL-SONIC log. Ran FDC-CNL f/10,625' to
4008'. Ran Dipmeter - tool failed. Ran back-up Dipmeter -
tool failed. Wait on 3rd Dipmeter tool to arrive. Ran
Dipmeter f/10,625' to 4008'. Rigged up for velocity survey.
RIHto 10,625'. ,~." . -.
.\ ;~,~ i-
~ .~
"
1',
t '
t
)-
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,ul"lless otherwise directed.
Form No I\J-'I)-*
,REV 3-1.70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORK OVER OPERATIONS
OIL 0 GAS r;;¡
WELL WELL lÃI
2 :\A\IE OF OPERATOR
l.
3. ADDRESS OF OPERATOR
4. LOC UIO~ OF \\ ELL
OTHER
S. API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
7. IF INDlAN'ALOTTEE OR TRIBE NAME
UNION OIL COMPANY OF CALIFORNIA
8 t:NIT FARM OR LEASE NAME
9 WELL NO.
TRAIL RIDGE UNIT #1
10. FIELD AND POOL, OR WILDCAT
11. SEe. T. R M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF \fONTH, CHANGES 11'1/ HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLl!MES USED, PERFORATIONS. TESTS AND RESULTS nSHING JOBS JUNK IN HOLE AND SlOE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
84
8/22/80
85
8/23/80
86
8/24/80
10,045'/0'
Hole Plugged
Back
£/10,830' to
10,045'
20"C.982'
13 3/8" C. 4008'
10,045'/0'
Hole Plugged
Back
£/10,830' to
10,045'
20" C.982'
13 3/8" C. 4008'
10,045'/0'
Hole Plugged
Back
f/10,830' to
10,045'
20" C. 982'
13 3/8" C. 4008'
SIGNED
14. 1 hereby certify that the foregoing IS true and correct
Completed velocity survey & reran dipmeter f/7600' to 5700'
(faulty tape on 1st one). Shot 45 SWS rec. 35, lost 9 & 1
misfire. RIH w/BRA #73 & RR bit #71. Circ. & condo mud on
top & fish @ 10,6}8'. Pooh. RIH w/6l4' of 3~" tail on 5"
D.P.
RIH w/6l4' of 3~" tail on 5" D.P. Equalized 500 sxS. c1. "G"
w/lO% sand, 1% CFR-2 and .1% HR7 thru O.E. 3~". Hung @
10,675'. 40 bbls. water ahead & 6 bbls. behind. C.I.P. @
'06:30 8/23/80. Pooh. RIH w/bit #71RR on BRA #74. Wait on
cmt. @ 13 3/8" shoe.
RIH & tag plug @ 10,017' @ 0200 hrs. 8/24/80. Polished off
hard cmt. to 10,045'. Pooh. Tested BOPE. RIH w/Dyna-Drill
#18 on BRA #75 with bit #72.
..."
\ (', "'
~ . -> \" , '"
.- [, "
, l, ."
(\ 'f~ :OJ
\ , t... /
n c" ,..
I
I' ,
, ¡-.
~ j ì
1':- '" ¡
/,~" - ""¡j"'-'~r....¡,
" I",. r-...
, ,
TITLE
DATE
NOTE-Report on thIs form is required for each calendar month, regardless of the status of operations, and must be filed 10 duplicate with the
oil and gas conservatIOn commIttee by the 15th of the succeeding month, unless otherwise directed.
(" SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
(
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
D GAS IV'1
WELL EJ
Form No 10-404
REV 3-1-10
OIL
WELL
2 NAME OF OPERATOR
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
5 API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO
7 IF INDIAN ALOTTEE OR TRIBE NAME
OTHER
8 UNIT FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
9. WELL NO
TRAIL RIDGE UNIT #1
10. FIELD AND POOL, OR WILDCAT
,-
11 SEC T R M. (BOTTOM HOLE
OBJECTIVE)
I
I
" '." " " ~
1 '. PERMIT NO.
I 71
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
87
8/25/80
88
8/26/80
89
8/27/80
90
8/28/80
10,188'/143'
20" C. 982'
l33/8"C.4008'
Completed trip in hole. Oriented Dyna-Dril1 850 rt. of H.S.
w/SDC steering tool. Dyna-Drill Run #18. Dyna-Dril1ed f/
10,045' to 10,095'. Pooh. RIH w/bit #73 on BRA #76 (30' belly
Reamed Dyna-Dri11 run. Directiona1ly drilled l2~" hole f/
10,095' to 10,188'.
10,419'/231' Ran survey @ 10,158'. Directiona11y drilled l2~" hole f/
20" C. 982' 10,188' to 10,408'. Ran survey @ 10,378'. Directional1y
13 3/8" C.4008' drilled 12~" hole f/lO,408' to 10,419'. Pooh. Trip was
tagged for 1st 32 stds. Had tight spots @ 8422' and 7983'.
RIH w/bit #74 on BRA #771.
10,746'/327'
20" C. 982'
133/8"C.4008'
Directionally drilled l2~" hole f/lO,419' to 10,525'. Ran
survey. W.L. parted while pulling off bottom w/survey
instrument. Pulled 3 stds. of d.p. and rec. W.L. Pooh w/
instrument. Directional1y drilled l2~" hole f/10,525' to
10,716'.
10,935'/189'
20" C. 982'
133/8"C.4008'
Pooh w/dril1 pipe. Had tight spots @ 10,517',10,174',8523',
8461', and 8398'. Remainder of hole condition was good. RIH
w/bit #75 on BRA #78 (60' belly). Did not see tight spots
on trip in. Reamed 30' to bottom. Directiona1ly drilled
12 1/4" hole f/10,746' to 10,935'. Circ. and make 10 stand
short trip.
SIGNED
14. I hereby certIfy that the foregoIng IS true and correct
DATE
TITLE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
(
.I
( SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRilliNG
AND WORKOVER OPERATIONS
0
Form No 10-404
REV ù-I-'iO
1.
OIL
WELL
GAS rVl
WELL IX.J
2. !\A \IE OF OPERATOR
5 API NUMERICAL CODE
6 LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN ALOTTEE OR TRIBE NAME
OTHER
8. UNIT FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
9. WELL NO
TRAIL RIDGE UNIT #1
4. LOCATION OF WELL
10. FIELD AND POOL. OR WILDCAT
11. SEC. T R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF 1\f0~TH, CHANGES IN HOLE SIZE, CASING AND CEME~TING JOBS INCLUDING DEPTH
SET AND VOLLTI\fES USED, PERFORATIO:"l.S. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE.TRACKED HOLE
AND ~'Y OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
91
8/29/80
11,135'/200'
20"C.982'
13 3/8" C.4008'
92
8/30/80
11,403'/268'
20" C. 982'
13 3/8" C. 4008'
93
8/31/80
11,633'/230'
20" C. 982'
13 3/8" C. 4008'
14. I hereby certify that the foregoing IS true and correct
SIGNED
Finished 10 std. wiper trip - hole in good shape. Direction-
ally drilled 12~" hole f/10,935' to 11,135'. Pooh. RIH w/bit
#76 on BRA #79. Hit bridge @ 10,922'. Pipe was stuck. Worked
pipe w/Ke11y. Pipe moved down the hole 19' to 10,941'. Could
not pull up. Jarred on pipe for 45 min. Pipe moved down the
hole. Reamed down to 10,977'.
Worked pipe back up thru tight spot @ 10,922'. Pulled pipe to
10,800'. Reamed down f/10,800' to 11,135'. Directiona11y
drilled 12~" hole f/11,135' to 11,299'. Pipe stuck - jarred
free. Drilled f/11,299' to 11,403'. Dropped survey and Pooh.
Had tight spot @ 10,845'.
Rec. survey instrument and RIH w/bit #77 on BRA #79. Reamed
60' to bottom. Directiona11y drilled 12~" hole f/11,403' to
11,633'. Made 10 std. wiper trip. Wiper trip was smooth.
-"". -
t
. \
(' .~',
. °. \ -
" ,
j
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed 10 duplicate with the
oil and gas conservation commIttee by the 15th of the succeeding month, unless otherwise directed.
J
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT-" for such proposals.)
ADL 1/56870
ø!
~
c....
:D
J3
I
yr
~
Form 10-403
REV. 1-10-73
(
Submit III ntentlons" In Triplicate
. "Subsequent Reports" In Duplicate
I
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
5. API NUMER ICAL CODE
50-283-20065
6. LEASE DESIGNATION AND SERIAL NO.
1.
OIL 0
WELL
GAS b1
WELL ~ OTHER
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
2. NAME OF OPERATOR
Union Oil Company of California
3. ADDRESS OF OPERATOR
P.O. Box 6247, Anchorage, Alaska
8. UNIT, FARM OR LEASE NAME
TRAIL RIDGE UNIT
99502
9. WELL NO.
TRAIL RIDGE UNIT #1
At surface
10. FIELD AND POOL, OR WILDCAT
WILDCAT
4. LOCATION OF WELL
1069.58'S & 329.03'W of the N.E. Cor., Sec. 9, 11. SEC.,T., R., M., (BOTTOM HOLE OBJECTIVE)
T20N, RlOW, S.M. SEC. 3, T20N, RlOW, S.M.
13. ELEVATIONS (Show whether OF, RT, GR, etc.)
12. PERMIT NO.
14.
216.6 above MSL 79-72
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
-
--
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAI R WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
ABANDONMENT*
track
CHANGE PLANS
WATER SHUT-QFF
FRACTURE TREATMENT
SHOOTING OR ACIDIZING
(Other) plug back & side
REPAIRING WELL.
ALTERING CASING
(NOTE: Report results of multiple completion on Well
- Com_Ion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
Due to a fish left in the hole it was necessary to side track Trail Ridge Unit #1
as follows:
1.
2.
3.
Layed in 658 L.F. cmt. plug from 10,675' to 10,017'.
Polished off plug to 10,045'.
Kicked off and redrilled l2~" hole from 10,045'.
Verbal approval from Russ Douglas
8/21/80.
R t~' ,,'" f' ~
~ ¡'" ,1 ¡ I
~ L .' 'I r '!"
. , ,--- ¡
. Î . i
Ace:3 8 1980 L.'
~/:cr(';I 0
'... ¡' f,
l:, ~ "
1 "i
Þ"c" '
. ~. :¡'.!rr."r.
. "¡" "
"<,,
'" J
Subsequent Wark Reported
on Form No¡4ì ~ ~ Dated ~/£?¡.œ
16. I hereby certify that the foregoing Is true and correct
\,.:.. ~, r.. ". _.b.. / ~ S.ßT IT LE
(This space for State office use)
SIGNED
DiRt. Drlr. ~1\,pt.
DATE
8/?Q/RO
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE
DATE
See Instructions On Reverse Side
\
\
02 OOlBIRev 10/761
('
.
<
N£f(JM"~:.
" ST ÄTE
of ALASKA
\I
TO r DATE
OIL AND GAS CONSERVATION COMMISSION
FILE NO
August 14, 1980
Att: Blair Wondsell
Trail Ridge Unit Correspondence
TELEPHONE NO
276-5113
SUBJECT
F~M Albert Z. Lewis, LMO Approved Oil & Gas Unit Agreement
Division of Minerals and Energy
DNR
Attached is Exhibit A for the Trail Ridge Unit Agreement which was
approved by Commissioner LeResche on July 29, 1980, and is effective
as of that date.
If this is not sufficient for your needs, we would be glad to provide
further information or documents at your request.
attachment
Ale
Wl
f) ,...,
¡;""r
l~ I'
~,,- I:~ / I
4' IiUe '/10
¡::8ka ¡ IJ 10, ~
(/¡ ¡ 4- IGlctJ
íY-tJ'/ r?r ð4! IJ ~ I f ~1¡"g@ ~.)fRs~~
~/t¿
UI1I (!) q
Form 10-403
REV. 1-10-73
(
Submlt"l ntentlons" In Triplicate
. "Subsequent Reports" In Duplicate
(
~
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
5. API NUMERICAL CODE
1.
OIL 0
WELL
GAS n
WELL LX.J OTHER
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
7
~
~\L1
~
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
use "APPLICATION FOR PERMIT"""" for such proposals.)
50-283-20065
6. LEASE DESIGNATION AND SERIAL NO.
ADL 1156870
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
P.O. BOX 6247, ANCHORAGE, AK. 99502
4. LOCATION OF WELL
At surface 1069.58'S & 329.03'W of the N.E. Cor., Sec. 9, WILDCAT
T20N, R10W, S. M. "11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
8. UNIT, FARM OR LEASE NAME
TRAIL RIDGE UNIT
9. WELL NO.
TRAIL RIDGE UNIT #1
10. FIELD AND POOL, OR WILDCAT
Sec. 3, T20N, R10W, S.M.
13. ELEVATIONS (Show whether OF, RT, GR, etc.) 12. PERMIT NO.
216.6' above MSL 79-72
14. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
-
~
CHANGE PLANS
WATER SHUT-DFF REPAI RING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
-
(Other) plug back and sidetrack
TEST WATER SHUT-DFF -
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
-----
(NOTEI Report results of multiple completion on Well
- Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
Due to stuck pipe resulting in a fish being left in the hole, it was necessary to plug
back and sidetrack Trail Ridge Unit #1 as follows:
1.
2.
3.
Spotted a 348 L.F. cmt. plug from 10,562' to 10,214' through OEDP hung at 10,562'.
Polished off plug to 10,225'.
Kicked off and sidetracked hole from 10,225'.
Verbal approval received from Russ Douglas 8/6/80.
f) ; ;'" r J " ,>--
i" r ! " "
-- ". r- ~ V 'r t.-
1\~1G 1 2 1900
/ I, . -. '1 ' ", ,
.._.~ -- ,,-, 0..,
p.ndwre:';
! ' ',', 11
16. I hereby certify that the foregoing Is true and correct
:~~::::~~~~~~~ù ~ ß\.
TITLE
Dist. Drlg. Supt.
DATE
8/12/80
APPROVED BY
CONDITIONS OF APPROVAL, IF ANY:
TITLE
DATE
See Instructions On Reverse Side
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT-" for such proposals.)
ADL 1156870
K. "
~
~
~
J\q
..
Form ',0-403
REV. 1-10-73
('
Submit "Intentions" In Triplicate
& "SuÞsequent Reports" In Duplicate
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
5. API NUMERICAL CODE
50-283-20065
6. LEASE DESIGNATION AND SERIAL NO.
1.
OIL 0
WELL
GAS n
WELL UU OTHER
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
P.O. BOX 6247, ANCHORAGE, AK. 99502
8. UNIT, FARM OR LEASE NAME
TRAIL RIDGE UNIT
4. LOCATION OF WELL
At surface
9. WELL NO.
TRAIL RIDGE UNIT 111
10. FIELD AND POOL, OR WILDCAT
1069.58'S & 329.03'W of the N.E. Cor., Sec. 9,
T20N, R10W, S.M.
WILDCAT
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
SEC. 3, T20N, R10W, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, ete.)
216.6' above MSL
12. PERMIT NO.
79-72
14.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
-
CHANGE PLANS
WATER SHUT-QFF
FRACTURE TREATMENT
SHOOTING OR ACIDIZING
(Other)
REPAI RING WELL
ALTERING CASING
ABANDONMENT*
TEST WATER SHUT-QFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other) Change
PULL OR ALTER CASING
-
MULTIPLE COMPLETE
ABANDON*
-
in Well Name (NOTEI Report results of multiple completion on Well
- ComPl8tlon or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of
starting any proposed work.
FROM:
TRAIL RIDGE WELL #1
TO:
TRAIL RIDGE UNIT #1
RFCL/\/FD
AUB - 8 1980
Alaska 011 & () ') ¡ iI¡~ !JUlliïnìSSIOn
Anghoral18
16. I hereby certify that the foregoing 15 true and correct
SIGNED
~:r-
R. Cn GO...ÅA.- /~TITLE
Dist. Drlg. Supt.
DATE
8/6/80
(This space for State office use)
APPROVED BY ~) 9. ~ TIT LE
CONDITIONS OF APPROVAL, IF AN : Cy 0..,.,.(........, ",,","': "'r~._~~
_aU..... & OJi Iwh-
COMMIGSIONER
COr~~i'ÎtUSSION
DATE
%-f-tft:;
See Instructions On Reverse Side
Approved ":'opy
Returned
f~fð
Form 1D-403
REV. 1-10-73
Submit "I ntentlons" In Triplicate
. "Subsequent Reports" In Duplicate
(
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
5. API NUMERICAL CODE
50-283-20065
6. LEASE DESIGNATION AND SERIAL NO.
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT--' for such proposals.)
AnL 1156870
1.
GAS Cï
WELL ~ OTHER
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
OIL 0
WELL
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
8. UNIT, FARM OR LEASE NAME
TRAIL RIDGE UNIT
9. WELL NO.
P.O. BOX 6247, ANCHORAGE, AK.
4. LOCATION OF WELL
At surface
99502
TRAIL RIDGE UNIT III
10. FIELD AND POOL, OR WILDCAT
WTT .nr.A 'f
11. SEC., T., R., M., (BOTTOM j-iOLE OBJECTIVE)
1069.58'S & 329.03'W of the N.E. Cor., Sec. 9, T20N,
RlOW, S . M.
Sec. 3, T20N, RlOW, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
12. PERMIT NO.
79-72
14.
216.6' above MSL
Check Appropriate Box To Indicate Nature of Notice, Report, or Othe~ Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
-
----,
TEST WATER SHUT-QFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other)
PULL OR ALTER CASING
-
MULTIPLE COMPLETE
WATER SHUT-OFF REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other) Plug back &Sidetrack
-
ABANDON*
CHANGE PLANS
-
(NOTEI Report results of multiple completion on Well
- ComPletion or Recompletion Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work.
Due to the inability to retrieve stuck d.p. it was necessary to plug back and sidetrack
Trail Ridge Unit III as follows:
1.
2.
3.
Spotted a 608 L.F. cmt. plug from T.O.F. at 7977' to 7369'.
Polished off plug to 7390'.
Kicked off and sidetracked hole from 7390'.
Verbal approval given by Russ Douglass on 7/22/80.
..." ..... ,.., r .
t j., "'P'"[)
1\ L ~~ [' ì \~. .
Þ.Ul3 -, 19æ
Alaska û!¡ ()(
. o,f<., -:I.dl
AnChuf aye
16. I hereby certify that the foregoing Is true and correct
~I:-
(This space for State office use)
APPROVED BY ~ ~ ~
CONDITIONS OF APPROVA~ ANY:
SIGNED
R. ('...Oð..~.... /~TITLE
Dist. Drlg. Supt. 8/7/80
DATE
COMMISSIONER f -g'- ftJ
DATE
TITLE
See Instructions On Reverse Side
II K.
~
~
1)
jW
CONf\\)U\1\Þ-l ( SUBMIT IN DUPLICATE (
STATE OF ALASKA CONFIDENTIAL
OIL AND GAS CONSERVATION COMMITT-EE 5. API NUMERICAL CODE
50-283-20065
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
OIL 0
WEll
Form No 10-41)4
REV 3-1-70
I.
GAS r:J
WELL lÃI
OTHER
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
6. lEASE DESIGNATION AND SERIAL NO.
ADL 1156870
"rK
B
~
~
J)
JLrt'
, -
:/ .r ~ I-'" .
,,~ ,~ ~ . ~
1.' . "
7 IF INDIAN'ALOTTEE OR TRIBE NAME
8. UNIT FARM OR lEASE NAME
3. ADDRESS OF OPERATOR
P.O. BOX 6247, ANCHORAGE, AK. 99501
9. WELL NO
TRAIL RIDGE WELL #1
10. FIELD AND POOL, OR WILDCAT
Wildcat
4. LOCATION OF WELL
1068.5l'S & 38l.5l'W of the N.E. Cor., Sec. 9, T20N,
RlOW, S.M.
II SEC T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 3, T20N, RlOW, S.M.
12. PERMIT NO.
79-72
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
32
7/1/80
40ll'TD
3963' ETD (FC)
30" D. 110'
20" C. 982'
33
7/2/80
4011' TD
3963' ETD(FC)
20" C. 982'
l33/8"C.4008'
Î" ""'l""'r-t-f""""
f :., ¡, ~ \. .~ j !
¡'L'..Lã 1; I,..!
I\UG - 8 1900
A'I"'r::k"1 Oil >ì.. n<;~> ¡ ,dc, v";.'¡iOl~C;'Or1
~.--.- , , ,', ....
AnonoraUG
Circ. & Condo mud while working pipe 5'. Made 25 std. wiper
trip. No fill after trip. Circ. clean. Pooh. Rig up and ran
103 jts. 13 3/8" combination 61# and 68" K-55 buttress casing.
Landed casing w/float shoe @ 4008'. Stab in float collar @
3863', 68# f/shoe to 2961', 61# f/296l' to surface. (Note:
Had to rig up circ. head and circ. 13 3/8" csg. past bridge
@ 3966' while running csg.). Circ. cap of csg. (9 BPM @ 500
psi w/same press taking returns up annulus or out 2-4" lines
on 20" csg. head). Removed 20" Hydril. (Note: 20" csg. head
damaged by Kelly - shouldn't present problem as 13 3/8" will
be cmt'd to surface).
Set Gray Tool Co. csg. hanger in 20" head w/275 M#. Reinstalled
20" Hydril and flowline. Cut off 13 3/8" landing jt. below
rotary table. Strapped in hole w/B&W stab-in sub. Stabbed
into F.C. @ 3963'. Circ. and condo mud for cementing. Rigged
up HOWCO and tested lines to 3000 psi. Pumped 50 bbls. of
water ahead of 1600 sx. cl. "G" w/2 1/2% pre-hydrated gel
(12.6 ppg). Had cement returns to surface. Followed with 250
sx. cl "G" w/Z% CaClZ (15.8 ppg). Displace drill pipe w/46
bbls. mud (10 bbls. short of total displacement). CIP @
10:15 hrs. 7/Z/80. Checked floats - held OK. Pooh w/stab-in
sub. Removed ZO" hydril and flowline. Installed Gray Tool Co.
csg. spool and tested to 1500 psi - OK. (Note: filled in
around pack-off w/plastic). Installed 13 5/8" 5M BOP stack.
14. 1 ha.by "or thot... r~~"moon~'
SIGNED If; L,fli'11~.(~~ ¿{¡TLE
August 6,1980
\ N
\
\
\
\
Dist. Drlg. Supt.
DATE
E- eport on this form is requIred for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservatIon committee by the 15th of the succeeding month, unless otherwise directed.
Form No 1O-41)¡
REV 3-1-70
(
(
SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
I.
OIL
WELL
5. API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO.
GAS r1C
WELL LJ-
7. IF INDlAN'ALOTTEE OR TRIBE NAME
OTHER
8 UNIT FARM OR lEASE NAME
3 ADDRESS OF OPERATOR
2. 1Io,A\fE OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
9. WELL NO.
TRAIL RIDGE WELL #1
4. LOCATION OF WELL
10. FIELD AND POOL. OR WILDCAT
II SEe. T. R. M (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END Of MONTH, CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLV\fES USED, PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE.TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
34
7/3/80
35
7/4/80
36
7/5/80
37
7/6/80
4g~1' T.D. Completed nippling up 13 5/8" 5000 psi BOP stack. Tested BOPE
20 C. 982' to state spec's (Upper Kelly cock wouldn't test - replaced
13 3/8" C. 4008' same). BOP test W.A.A. by state D.O.G. Rep. RIH w/bit
33RR on BRA #38. Tagged cmt. @ 3582'. c.o. cmt. stringers
f/2582' t03932' and C.O. hard cmt. f/3932' to F.C. @ 3963'.
Tested 13 3/8" csg. to 2500 psi - OK.
4205'/194'
20" C.982'
l33/8"C.4008'
Drilled out F.C. and cmt. to shoe @ 4008'. Retested 13 3/8"
csg. to 2500 psi - OK. Drilled out shoe and made new hole to
4025'. Pulled into csg. and performed leak-off test of the
13 3/8" shoe. Formation would stabilize and hold 600 psi @
surface w/68 PCF mud in hole I.E. 91.5 PCF equiv. Pooh. Ran
SDC Gyro Survey f/surface to 3975'. RIll w/bit #40 on BRA #39.
Directionally drilled l2~1 hole f/4025 4205'.
4484'/279' Directionally drilled f/4205' to 4332'. Pooh. RIH w/bit #41
20"C.982' on BRA #39. Reamed to BTM f/4242' to 4332'. Directionally
13 3/8"C.4008' drilled l2~tI hole f/4332' to 4484'.
4544'/60'
20"C.982'
l33/8"C.4008'
Pooh. RIH w/BRA #40 and bit #42 for Dyna-Drill run #10.
Oriented Dyna-Drill 900 left of R.S. w/SDC steering tool.
Dyna-drilled l2~" hole f/4484' to 4514'. Bit locked up. Pooh.
RIR w/BRA #40 and Bit #43 for Dyna-Drill run #11. Oriented
Dyna-DrillllOo N.S. w/SDC steering tool. Dyna-Drilled l2~"
h 1 f/45l4' t 4544' '., -,., ,"-' , " - , . r--.."
0 eo. : ';) ", 'U:
< ' "L ¡ V :...
-'~ B ~ "d' "..
) " '<
I ,~.~.! " '.. >,"".-i""J
/1-
, Ii' 1<, '" ~ t.,)f1S, iJOlflIl1ISStO¡,
1">Î1 (.J 11 in ;1rJI
SIGNED
14. I hereby certIfy that the foregOIng IS true and correct
DATE
TITU:.
NOTE-Report on thIs form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation commIttee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-11)4
REV 3-1-70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
S. API NUMERICAL CODE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
6. LEASE DESIGNATION AND SERIAL NO
I.
OIL
WEll
GAS r::l
WELL UU
7 IF INDIAN ALOTTEE OR TRIBE NAME
OTHER
2. NA\tE OF OPERHOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT FARM OR LEASE NAME
3 ADDRESS OF OPERATOR
9. WELL NO.
TRAIL RIDGE WELL #1
4 LOCHION OF \\ElL
10. FIELD AI'ID POOL. OR WILDCAT
II SEe. T R. M (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPTH H END OF \fONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET Al'o.D VOLV\tES VSED. PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGl'o.lFICANT CHANGES IN HOLE CONDITIONS.
43
7/12/80
5851'/25'
20"C.982'
l33/8"C.4008'
(Completed Pooh looking for washout). Did not find W.O.
Staged DC's and HWDP back in hole. Had 2000 psi pressure at
top of HWDP. Staged back in hole. Circ. pressure w/34 stds.
in hole was 1700 psi. Staged back out to top of HWDP. Pressur
now was 1300 psi. Pooh. RIH w/blanked-off bit to top of HWDP.
Pressure tested to 5000 psi - OK. Pooh. RIH w/bit #50 on
BRA #46. Circ. @ top of HWDP w/2l00 psi @ 55 SPM. (normal
pressure). RIH. C.O. 10' bridge @ 5534'. Directionally
drilled l2~' hole f/5826' to 5851'.
44
7/13/80
6045'/194' Pooh. RIH w/bit #51 on BRA #46 (locked-up assembly) and
20"C.982' drilled f/585l' to 5994'. Pooh. RIH w/bit #52 on BRA #47 (20'
13 3/8"C.4008' pendulum assembly) and drilled l2~" hole f/5994' to 6045'.
45
7/14/80
6341'/296'
20"C.982'
l33/8"C.4008'
Directionally drilled l2~" hole f/6045' to 6175'. Pooh. RIH
w/bit #53 on BRA #48 (30' pendulum assembly). Washed 230' to
bottom. Directionally drilled l2~" hole f/6l75' to 6341'.
Pump pressure dropped from 2100 psi to 1300 psi @ 58 SPM.
Pooh. Found 1 jet gone from extended nozzle. RIH w/bit #54 on
BRA #49. (10' pendulum assembly).
"r.r['~f;'b
~'<¡ L I, i , ¡, ~> , ,
"'" L.r' i,I .' I~.'
/, ¡ I"" 8 1')õ('
I,U lJ ~., . ,.';;'v..'
t.l:.::::; 01' & :....'~ ' I
,.
, ,I
hnch¡¡¡alJ~
14. I hereby certify that the foregoIng IS true and correct
SIGNED
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No IO-l11-t
REV 3.1.70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
I.
GAS rvI
WElL ~
OTHER
5. API NUMERICAL CODE
6. LEASE DESIGNATION A/IoD SERIAL NO.
7. IF INDlAN'ALOTTEE OR TRIBE NAME
OIL
WEll
2 /IoAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
3 ADDRESS OF OPERATOR
4 LOCATION OF WElL
8 UNIT FARM OR LEASE NA\tE
9. WElL No'TRAIL RIDGE WELL III
10. FIELD AND POOL. OR WILDCAT
II. SEC. T R. M (BOTTO\t HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF \10NTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED. PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE.TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
38
7/7/80
4675'/131'
20"C.982'
l33/8"C.4008'
39
7/8/80
Dyna-dri1led 12~" hole f/4544' to 4562'. Rigged down SDC and
Pooh. Layed down dyna-dri1l. RIH w/bit 1144 on BRA 1141.
Reamed f/4484' to 4562'. Directionally drilled l2~" hole f/
4562' to 4672'. Fooh. RIH w/bit 1145 on BRA 1142 and reamed
f/46l2' to 4672'. Directionally drilled l2~" hole f/4672'
to 4675'.
5225'/550' Directionally drld. l2~" hole f/4675' to 5117'. Made 10 stand
20"C.982' wiper trip. Had no drag and no fill. Directionally drld.
13 3/8"C.4008' l2~" hole f/5ll7' to 5225'.
40
7/9/80
5363'/138'
20"C.982'
l33/8"C.4008'
41
7/10/80
5683'/320'
20"C.982'
l33/8"C.4008'
42
5826'/143
20"C.982'
l33/8"C.4008'
~. ~~r~-¡"r".r,
)' ,-~ -,I
,t\.."tïVL~J
(",US ~ 8 '900 J
7/11/80
\, 0 0 G " ¡ ')I\~ IJO,.!¡í" ;';,,(,
^\"r...it;1 \' Ut ",.,
1"\ (.."r-....
Anclll.Hagl;)
14. I hereby certify that the foregoing IS true and correct
SIGNED
Directionally drilled l2~" hole f/5225' to 5305'. Pooh. RIH
w/Dyna-drill #12 on bit 1146 and BRA #43. Orient tool face
750 left on high side. Dyna-drilled l2~" hole f/5305' to 5363'
Pooh. RIH w/bit 1147 on BRA #44.
RIH w/bit 1147 on BRA 1144. Directionally drilled l2~" hole
f/5363' to 5470'. Pooh. Tested BOP stack. RIH w/bit #48 on
BRA 1145 (locked up assembly). Directionally drilled l2~" hole
f/5470' to 5683'.
Directionally drilled l2~" hole f/5683' to 5805'. Pooh. RIH
w/bit 1149 on BRA 1146. Plugged bit - could not unplug. Pooh.
Cleared bit and RIB. Directionally drilled l2~" hole f/5805'
to 5826'. Pump pressure dropped f/2500 psi @ 50 SPM to 1850
psi @ 58 SPM. Pooh looking for washout.
TITLE
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operatIons, and must be filed in duplicate with the
oil and gas conservatIon commIttee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-41)4
REV )-1-70
(
SUBMIT IN DUPUCA TE \ (
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORK OVER OPERATIONS
0
1.
OIL
WELL
GAS r:J
WELL U
OTHER
5. APIl'iUMERICAL CODE
6. LEASE DESIGNATION Al'iD SERIAL NO.
7. IF INDIAN ALOTTEE OR TRIBE NAME
2. NA\fE OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT FARM OR LEASE NAME
3. ADDRESS OF OPERATOR
4. LOCATIO;\l OF ~ELL
9 WELL NO.
TRAIL RIDGE WELL #1
10. FIELD AND POOL, OR WILDCAT
II. SEe. T R. M. (BOTTOM HOLE
OBJECTIVE)
12 PERMIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET Ar-.D VOLVMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND Al'lY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
46
7/15/80
47
7/16/80
48
7/17/80
6732'/391'
20"C.982'
l33/8"C.4008'
6907'/175'
20"C.982'
133/8"C.4008'
7072'/165'
20" C.982'
l33/8"C.4008'
SIGNED
14. I hereby certIfy that the foregOIng IS true and correct
RIH w/bit #54 on BRA #49 (10' pendulum assembly). Direction-
ally drilled l2~" hole f/634l' to 6532'. Pooh. RIH w/bit #55
on BRA #50 (30' pendulum assembly) and washed 240' to bottom.
Directionally drilled l2~" hole f/6532' to 6732'. Pump
pressure dropped from 2200 psi to 450 psi @ 59 SPM. Pooh.
Lost 2 extended nozzles on bit #55. RIH w/bit #56 on BRA #51.
RIH w/bit #56 on BRA #51 (l~ hrs. down time to pull clutch in
pump). Washed down from 6307' to 6732'. Drilled on junk (2
extended nozzles) for 1/2 hr. Directionally drilled l2~" hole
f/6732' to 6907'. Dropped survey.
Pooh w/bit #56 and BRA #51. RIH w/bit #57 on BRA #52 (30'
pendulum assembly). Down 1 hour to repair clutch on pump
drive. Directionally drilled l2~" hole f/ 6907' to 698-2'. Ran
W.L. survey - wireline broke while retrieving survey. Pooh.
Rec. survey instrument. RIH w/bit #57RR on BRA #52. Washed
and reamed f/6909' to 6982'. Directionally drilled l2~" hole
f/6982' to 7072'. Pooh.
R fr If'" E . \jf ~'. r~,
,¥ j.,,~~, ., ~ ~'" ¡ ;
'" L. \... i I~. !....
f\UG - 8 ~gefJ.
^I " co &. ('.", l,,\ì~). vi... 11:1:"';'00
t"~\c.G1\.a di~ v,:J
AnC!hH ét!Jra
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10404
REV 3-1-70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
I.
OIL
WELL
GAS ðh
WELL CJ
OTHER
2. NA\lE OF OPERATOR
5. API NUMERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO
7. IF INDIAN 'ALOTTEE OR TRIBE NAME
8 UNIT F AR\I OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
1 ADDRE~OFOPERATOR
9. WELL NO.
4. LOCATION OF WELL
TRAIL RTDGR WRT.T. #1
10. FIELD AND POOL. OR WILDCAT
II SEC. T R. M. (BOTTOM HOLE
OBJECTIVE)
.'
12 PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF \fONTH, CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AI'iD VOLUMES USED. PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
49
7/18/80
7215'/143'
20" C.982'
l33/8"C.4008'
50
7/19/80
RIH w/bit #58 on BRA #53 for Dyna-Drill Run #13. Washed to btrn
f/7042' to 7072'. Oriented Dyna-drilllOOo left of H.S. w/SDC
steering tool. Dyna-drilled f/7072' to 7137'. Pooh. RIH w/
bit #57RR #2 on BRA #54 (a 30' pendulum). Reamed f/7072' to
7137'. Dir. drilled f/7l37' to 7215'. Surveyed & Pooh.
7562'/347' RIH w/BRA #55 & bit #57RR #3. Reamed f/69l5' to 7215'. (BRA
20"C.982' #55 packed assy. w/lO' lead collar). Directionally drilled
13 3/8" C.4008'f/72l5' to 7562'. Lost 700 psi on pumps. Pooh. Jet was
washed out in bit.
51
7/20/80
8073'/511'
20"C.982'
l33/8"C.4008'
52
7/21/80
8073' /0'
20"C.982'
l33/8"C.4008'
i:) f" ¡<"" E I ~ r . '~,
,.,. ,'" ¡ '- II " .J. ,
,\. ' " "
,,~,~, '\/~~;f
, "~'
b il\~ -. 8 '1}.1n
"\., v ,""""""
AI:,sk:~ (II ¿ '..~ "
,-"
t n~!1.., ¡ ~ue
14. I hereby certify that the foregolßg IS true and correct
SIGNED
RIH w/bit #59 on BRA #55. Reamed to btm. f/7532' to 7562'.
Directionally drilled f/7562' to 8073'. Stuck drill pipe @
8073', driller was attempting to hold 65M# on bit as per
directional eng. request and drilled into coal break ~ 8070'
& was stuck by 8073', 3' into coal break. Worked pipe and
jars and attempted to free pipe. After 4 hrs. of working
pipe at a reduced circ. rate, a washout developed or a nozzle
was damaged causing loss of 900 psi of pump pressure.
Mixed black magic - SFT pill. Pumped 21 bbls. water & 7 bbls.
diesel ahead of 41.5 bbls. of pill. Displaced w/l bbl. diesel,
3 bbls. water and 110 bbls. mud leaving 18 bbls. of pill
around collars and 24 bbls. in drill pipe. Worked D.P. from
100M# to 375M# while displacing 1 bbl. of pill every 2 hours.
TITLI:.
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-404
REV 3.1-70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
5. API /ljUMERICAL CODE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
6 LEASE DESIGNATION AND SERIAL NO
I.
OIL
WELL
GAS rYI
WELL L.:.J
7. IF INDIAN 'A LOTTEE OR TRIBE NAME
OTHER
2. NAME OF OPERATOR
8 UNIT FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
3 ADDRESS OF OPERATOR
9 WELL NO
4. LOCATION OF \'tELL
'PRATT. RTn~F. WFT.T. III
10 FIELD AND POOL. OR WILDCAT
11. SEC T R M (BOTTOM HOLE
OBJECTIVE)
12 PERMIT NO
13. REPORT TOTAL DEPTH AT END OF \fONTH. CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED. PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS,
53
7/22/80
8073' /0'
20" C. 982'
l33/8"C.4008'
Jarred on stuck D.P. f/lOOM# to 375M#. Would not come free.
Slacked all weight off and manually backed off drill pipe @
+2050' . (Had 40,,000# P. U. weight). Set Kelly back and
removed Kelly screen. Screwed back into fish. Checked torque
and weight.. Rigged up Dialog on S.D.C. W.L. and RIH w/CCL,
free point indicator, and 500 gr. shot. Found free point in
top monel D.C. Stabilizer below monel D.C. was 100% stuck
@ 7973'. Worked 5 rounds of left torque into pipe and fired
charge - had no indication of movement. Pooh. RIH w/700 gr.
charge. Worked 7 rounds of left torque into pipe and fired
charge - had no indication of movement. Pooh. Worked pipe
to the left and pipe backed off. Had a pick-up weight of
225M#. R.D. Dialog and S.D.C. Pooh w/D.P. Pipe would tight
for 8 stds.
. ~
: I ,.
." " "
c. , ¡;, . ' f ,
'1 ,. L.J
AU3 - 8 ~~'Ú,."f'\;
.'~{^
Ak:sk~ Ù¡; & Gas l"Jf[:¡,
v..mjOIS3/ûn
Anchorage
14. I hereby certify that the foregoing IS true and correct'
SIGNED
TITLE
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,'mless otherwise directed.
Form No. 10-404
REV 3 1-70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
S. API NUMERICAL CODE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
6. LEASE DESIGNATION AND SERIAL NO
1.
OIL
WELL
2. NAME OF OPERATOR
GAS n
WELL ~
7. IF INDIAN'ALOTTEE OR TRIBE NAME
OTHER
8. UNIT FARM OR LEASE NAME
UNTON OTT. COMPANY OF C'.AT.TFOR~T A.
3. ADDRESS OF OPERATOR
9 WELL NO.
TRAIL RIDGE WELL #1
4. LOCATION OF WELL
10. FIELD AND POOL, OR WILDCAT
II SEC. T. R. M (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
54
7/23/80
8073' TD
7977' TOF
20" C. 982'
l33/8"C.4008'
Pooh after back-off. Rec. 1 monel D.C. and 2 stabs. Top of
fish @ 7977'. (Left bit, 6 pt. stab, 10' lead collar, 6 pt.
roller reamer, 30' monel D.C., stab, 30' monel D.C. in hole -
95.17') RIH w/bit #49RR on BRA #56. Reamed tight hole f/7444'
to 7977'. Circ. and condo mud @ 7977'. Pooh M.U. 610' of
3~" butt. tbg. stinger on 5" D.P. and RIH.
55
7/24/80
8073' TD
7325' PBTD
20"C.982'
l33/8"C.4008'
RIH w/6l0' of 3~" tbg. stinger on 5" D.P. Hung @ 7975'.
Circ. and cond. mud. Lead w/10 bbls. water followed by 500
sx. cl. "G" w/l% CFR-2 and 10% sand. Disp. w/124 bbls. mud.
CIP @ 05:15a.m. (Theoretical top of cmt. @ 7325'). Pooh and
lay down 3~" tbg. RIH w/bit #58RR on BRA 1156 to shoe of
13 3/8" csg. Circ. and WOC 18 hours. RIH w/BRA #56 @ 23:15
hrs.
R',E/""r'",~';{ .,.
ø t I \;
" '-1
~ ,~~ ~,
f ~ I t-'. ç¡ 1 ß t ,-' "I
\..;'c'" ( ..¡;,
t 1",("', 0; K r: c'
¡'j~{---
14. I hereby certIfy that the foregomg IS true and correct
SIGNED
TITLE
DATE
NOTE-Report on this form is requIred for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed,
Form No 10404
REV 3-1-70
('
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
I.
OIL
WELL
2 NA\fE OF OPERATOR
GAS n
WELL ~
OTHER
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS or OPERATOR
4. LOCATION OF WELL
5. API NUMERICAL CODE
6 LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
9. WELL NO.
TR 4. TT. RTnGE \~ELL III
10 FIELD AND POOL, OR WILDCAT
II. SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPTH AT E:ND OF \fONTH, CHANGES IN HOLE SIZE, CASING AND CEMPHING JOBS INCLUDIJI;G DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK Il'o HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
Drilled l2~" hole f/7543' to 8221' (Had drilling break f/807l'
to 8080'. Bottoms up showed some coal and wood fragments).
20"C. 982' Pooh. M.D. bit #63 on BRA #60 (Angle-building assembly).
l33/8"C.4008'
56
7/25/80
7450'/60'
KOP 7390'
20" C. 982'
l33/8"C.4008'
57
7/26/80
7543'/93'
I<OP 7390' '
20" C. 982'
l33/8"C.4008'
58
7/27/80
8221' /678'
59
7/28/80
8579'/358'
7977' T.O.F.
20"C.982'
l33/8"C.4008'
14. I hereby certify that the foregoing IS true and correct
SIGNED
Finish RIH w/bit #58RR on BRA #56. c.o. cement stringers @
@ 7245'. Tag firm cmt. @ 7369'. c.o. cmt. f/7369' to 7390'.
Circ. and Pooh. RIH w/bit #60 on BRA #57 for Dyna-Drill Run
~. Oriented D/D 750 left on high side. Dyna-Drilled l2~"
hole f/7390' to 7450'. S.D.C. showed 4!:í" left turn and no
drift angle change.
Rigged down S.D.C. and Pooh. Tested BOPE - OK. RIH w/bit
#61 on BRA #58 (follow-up assembly) and directionally drilled
l2~" hole f/7450' to 7511'. (1st survey below D/D run showed
130 of left hand turn). Pooh. RIH w/bit #63 on BRA #59
(locked-up assembly). Directionally drilled l2~" hole f/75ll'
to 7543'.
RIH w/bit #63 on BRA #60 and directionally drilled l2~" hole
f/822l' to 8579'. Pooh. Hole was tight 1st five stands.
RIH w/bit #63 on BRA #61.
.. .
, ,
"-L",\ ~4,~fl
J I 1"\ 0 '~1') "...
~',J"l' :C~,
~
t,/", .'
¡t1'1':/~',,/ì'-- ("
. . ,.., l,J""IIi/ ':'110n
I ,¡;c!1;..'r?()~
TITLE:
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10404
REV 3-1-70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
1.
OIL
WELL
GAS n
WELL lr
OTHER
2. NA\fE OF OPERATOR
UNTON OTT. r.O}fPANY OF CALTFORNIA
3 ADDRESS OF OPERATOR
4. LOCATIO"l OF ~ELL
5. API NU\fERICAL CODE
6. LEASE DESIGNATION AND SERIAL NO
7. IF INDlAN'ALOTTEE OR TRIBE NAME
8 UNIT FARM OR LEASE NAME
9. WELL NO.
TRAIL RIDGE WELL #1
10. FIELD AND POOL, OR WILDCAT
II. SEe. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12 PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEME"ITING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
60
7/29/80
8700'/121'
20" C.982'
l33/8"C.4008'
61
7/30/80
8755'/55'
20"C.982'
l33/8"C.4008'
14. I hereby certIfy that the foregolßg IS true and correct
SIGNED
RIH w/bit #64 on BRA #61. Stuck bit @ 8544' (35' off bottom)
while reaming to bottom on trip. Had washout while working to
free pipe (press~re dropped f/2000 psi @ 45 spm to 1800 psi @
60 spm). Worked torque down to jars and jarred on d.p. Pipe
pulled free. Pooh looking for washout. Pipe pulled tight 1st
14 jts. Found washout in 16th joint from surface (slip area
of "G" pipe). Completed Pooh. RIH w/bit #64 on BllA #61 and
reamed f/84851 to 85791. Directionally drilled l2~" hole
f/8579' to 8698'. Pooh. RIH w/bit #65 on BRA #62 for Dyna-
Drill Run #15. RU SDC. Oriented tool 800 right of high side.
Could not get D/D to operate. D/D began to operate after 2
hours. Re-oriented D/D and directionally drilled l2~" hole
f/8698' to 8700'. D/D stopped drilling again.
Pooh w/Dyna-Drill #15. Changed D/D. RIH w/bit #65RR on BRA
#62 for Dyna-Drill Run #16. RIH w/SDC - could not seat tool.
Circ. to clear assembly. Seated tool and oriented D/D 860 rt.
of high side. Directionally drilled l2~" hole f/8700' to
8755'. R.D. SDC and Pooh. Layed down Dyna-Drill. RIH w/bit
#63RR on BRA #63 (locked assembly).
D ra P""' """ ~ \ t: ~A
"\ í-V ~-~ ,!~wr).
.i, ~ ~ L ,/ I,. , " I!
~~"""'~\I'._l"'"
I' I)'l~, 8 11)011
{", \oJ"" , ,<\0' v... ,
/1
, ,,, - I ',':
TITLE
DATE
NOTE-Report on this form IS reqUIred for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10"'04
REV 3-1-70
(
SUBMIT IN DUPLICATE
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
5. API NUMERICAL CODE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0 GAS n
WELL ---x
6. LEASE DESIGNATION AND SERIAL NO.
I.
OIL
WELL
7. IF INDIAN-ALOTTEE OR TRIBE NAME
OTHER
2. NA~IE OF OPERATOR
8 UNIT FARM OR LEASE NAME
IJNTON OTT. r.OMPANY OF Ci\T.TFOP~T..A-
3 ADDRESS OF OPERA TOR
9. WELL NO.
TRAIL RIDGE WELL #1
4. LOCATION OF "'ElL
10 FIELD AND POOL. OR WILDCAT
II. SEC. T. R. M (BOTTOM HOLE
OBJECTIVE)
12 PERMIT NO.
13. REPORT TOTAL DEPTH AT END OF MONTH. CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INClUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
62
7/31/80
9550'/795' RIH w/bit #63RR on BRA #63. Reamed hole f/8665' to 8755'.
20"C.982' Directionally drilled l2~" hole f/8755' to 9550'.
13 3/8" C.4008'
~'~ ;' '" ¡
. ~
r "
'0', ~~ - '...., ~
'r --\ 0', " ),.""
j \ 'I -, ,', . '-, , ~" '
f - c" ,J c
'11""-'" ~,\I .
I' ,~.~ I,.
/' I '"
14. I hereby certify that the foregoing IS true and correct
SIGNED
TITLE.
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
Form 11110 1(I-4Q4,
REV ~3-1-70
Whi-.ûENTt'- .
STATE uF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUBMIT 11111 DUPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0 ~~~l [X] OTHER t( I: C f: I V t D
JUt. 1 ð 8)
I. OIL
WEll
2. "iAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
(s An NUM~~~~!q[NTlAL
50-283-20065
1/1:
J-;
))
L~
~
~n
!3
þ
6 lEASE DESIGNATION AND SERIAL NO
ADL #56870
7. IF INDIAN'AlOTTEE OR TRIBE NAME
8- UNIT FARM OR lEASE NAME
9. WELL NO.
P.O. BOX 6247, ANCHORAGE, AK. 9950lAlaska 011 , Gi~ ¡ ':I~, .." ""',"'<~IJn TRAIL RIDGE WELL 111
4. LOCATION OF \\Ell AI\I;!ll)f~lII. 10. FiElD A!,\¡D POOL. OR WilDCAT
WILDCAT
1068.5l'S & 38l.5l'W of the N.E. Cor., Sec. 9, T20N, RlOW,
S.M.
II. SEC T. R. M. (BOTTOM HOLE
OBJECTIVE)
Sec. 3, T20N, RlOW, S.M.
12 PERMIT NO.
79-72
13. REPORT TOTAL DEPTH AT END OF M01'l/TH. CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDl1'I/G DEPTH
SET AND VOlUI\1ES USED, PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
6/1/80 Drilled from 481' to 497'.
481'/687' #2 for Dyna-Drill run Ill.
30" D.llO' 687'. Pooh w/D.D.
2
Circ. clean and Pooh. RIH w/bit #5 on BRA
Oriented tool and dyna-drilled f/497' to
6/2/80 RIH w/bit 116 on BRA 113. Directionally drill17~" hole f/687' to 996'.
30" D.llO' Plugged bit. Pooh. RIH w/bit 117rr on BHA #3 and directionally
drilled l7~" hole f/996' to 1020'. Circ. hole clean and Pooh. R.U.
Schlumbérger and ran DIL-SFL-SP log. Rigged down Schlumberger.
Removed 20" 2000 psi Hydril.
3
6/3/80 Install 30" riser. RIH w/BRA 114 and open l7~" hole to 26" f/llO' to
30" D.llO' 690'. Pooh. Change hole opener and RIH. Continue to open hole to
26" f/690' to 798'. Down to repair washed out union in mudline.
4
6/4/80 Down to repair mud lines. Reamed 26" hole to 798'. Hit bridge. Pooh.
26" f/798' RIH w/17~" bit on BRA 115 and C.O. f/708' to 1020'. Circ. and made
to 950' wiper trip. Reamed thru tight spot @ 690'. Bit plugged. Pooh and
30"D.llO' cleaned bit. RIH and C.O. f/690' to 1020'. Pooh. Layed down 14 jts.
of HWDP and l7~" BRA 115. RIH w /26" H. o.
)
6/5/80
26"f/950'
to 950'
30"D.llO'
RIH w/26" H.O. Opened hole f/760' to 940'. Circ. and build mud volume.
Opened hole f/940' to 960'. Pooh. Replaced bullnose on H.O. w/17~"
bit. RIH and opened hole to 26" f/960' to 1020'. Made wiper trip -
OK. Pooh and layed down 26" BRA. Removed rotary. Rigged up to run
20" csg.
14. I hereby rufy hat the fQr.e~ .zJ1ueJf) correct_I!.
SIGNED It'. C4...fjl/A4~~ITLE Dist. Drlg. Supt.
DATE
July 14.,1980
port on thIs form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-404
REV,3-1-70
( SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
( :(J~""'D
- ¡!orJ r-"
~ I .f¡Vì¡ A
5. API NUMERJ~AL c&dtil
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
OIL 0
WELL
I.
GAS r:::t~
WELL I.ÃA
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT FARM OR LEASE NAME
3 ADDRESS OF OPERATOR
4 LOCATION OF WELL
6. LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN ALOTTEE OR TRIBE NAME
OTHER
9. WELL NO.
Trail Ridge Well #1
10. FIELD AND POOL. OR WILDCAT
11. SEC T R. M (BOTTOM HOLE
OBJECTIVE)
12 PERMIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS. TESTS AND RlSDLTS FISHING JOBS JUl'IJK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
7
6/6/80
30"D.llO'
20"C. 982'
8
6/7/80
30"D.llO'
20"C. 982'
9
6/8/80
1134'/114'
30"D.llO'
20"C.982'
14. I hereby certIfy that the foregoing IS true and correct
SIGNED
Ran 23 jts. of 20" 94# H-40 buttress csg. Set shoe @ 982', float
collar @ 936'. Landed csg. on Gray Oil tools fluted mandrel hanger.
Ran stab-in sub on 5" D.P. and circ. mud. Pumped 50 bbls. water
ahead of 800 sx. cl. "G" w/2~" pre-hydrated gel and 2% CaC12
followed by 200 sX. cl. "G" w/2% CaC12' Displaced w/4.5 bbls. mud.
CIP @ 22:30 hrs. 6/6/80. Did not have cement returns to surface.
Re~oved 30" riser.
Ran 1" pipe down 20" x 30" annulus to cement basket @ 70'. Dis-
placed mud w/water and cemented annulus w/80 sx. cl. "G" w/2% CaC12'
CIP @ 3:00 hrs. 6/7/80. Installed 20" 2000 psi x 20" buttress csg.
head. Installed 20" Hydril w/choke and kill lines. RIH w/17~" bit.
Tagged cement @ 934'. Tested csg. to 500 psi - OK. Drilled F.C.
@ 936' and cement to 961'. Tested csg. to 500 psi - OK. Drilled
cement to shoe @ 982'. Tested csg. to 500 psi - OK. Drilled shoe
and C.O. rathole to 1020'. Circ. and condo mud.
Dumped and cleaned tanks. Built new mud volume. Began circe -
again contaminated system. Dumped and cleaned tanks. Circ. & Pooh.
RIH w/bit #10 on BRA #6. Directionally drilled f/l020' to 1134'.
Circ. and Pooh. P.U. and RIH w/bit #11 on BRA #7 for Dyna-prill
Run #2.
RECf! \1;"f',
V I. lJ
JUL 1 5 1980
Alaska (j¡1 & C, q .
, .
Anc.DvI ~g~
il...
II
TITLE:.
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-404
REV 3-1-70
( SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
( rONFIDf/V
5. API NUMERICAL CODE rIAL
MONTHLY REPORT OF DRilliNG
AND WORKOVER OPERATIONS
I.
OIL 0 GAS r::1
WELL WELL UU OTHER
2. !IoAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERA TOR
4. LOCATIONOF\\ELL
6. LEASE DESIGNATION AND SERIAL NO
7. IF INDIAN'ALOTTEE OR TRIBE ~AME
8. UNIT FARM OR LEASE NAME
9 WELL NO.
TRAIL RIDGE WELL #1
10 FIELD AJ'liD POOL. OR WILDCAT
II. SEC T. R. M. (BOTTOM HOLE
OBJECTIVE)
12 PERMIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS. TESTS AND RE:.SULTS FISHING JOBS JUNK IN HOLE AND SIDE.TRACKED HOLE
AND ANY OTHER SI<..NIFICANT CHANGES IN HOLE CONDITIONS
10
6/9/80
1598'/464'
30" D.llO'
20" C.982'
11
6/10/80
1847' /249'
30" D. 110'
20" C. 982'
12
6/11/80
30" D.llO'
20" C.982'
13
6/12/80
30"D.llO'
20" C. 982'
14 I hereby certify that the foregoing IS true and correct
SIGNED
Oriented dyna-drill and directionally drilled l2~" hole f/1134' to
1267'. Pooh. Left 1 cone off bit in hole. RIH w/bit #12 on BRA
118. Directionally drilled l2~" hole f/1267' to 1563'. Pooh for
bit change. RIH w/bit 1113 and directionally drilled l2~" hole
f/1563' to 1598'.
Dirctionally drilled l2~" hole f/1598' to 1691'. Pulled 1 stand
of d.p. - broke T-latch on rig tongs. Rig down 6~ hours waiting
on replacement parts. Pooh. Layed down BRA 118. P.U. dyna-drillon
BRA 119 and RIH. Orient dyna-drill for drift angle increase and
directionally drill12~" hole f/169l' to 1817'. Pooh. Layed down
dyna-drill assembly. P.U. bit 1115 on BRA 1110 and RIH. Reamed
f/1786' to 1817'. Directionally drilled l2~" hole f/1817' to 1847'.
Directionally drilled l2~" hole f/1847' to 2194'. Pooh. P.U. Bit
1116 on BRA 1111 and RIH. Directionally drilled l2~" hole f/2l94' to
2322'. Pooh. P.U. Bit 1112 on BRA 1117 and RIH for Dyna-Drill
Run 114.
RIH w/BRA 1112 for dyna-drill run 114. Orient 600 Rt. of high side.
Directionally drilled l2~" hole f/2322' to 2424'. Pooh. RIH w/Bit
1118 on BRA 1113 (angle - building assembly). Directiona1ly drilled
l2~" hole f/2424' to 2608'. Pooh. M.U. locked-up BRA #14.
RE.""',E'\ff"r,
'\. l. I V r l)
JUL 15 1980
Alaska Oil & G,,') , d:, lJ\r".,¡¡I'<.:r.1'
Alh.;1 ".II i;tt!¡
TITLE:.
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month,unless otherwise directed.
(SUBMIT IN DUPLlCATÈ \ ,,( ,"~'. !'-:t ~ ~
STATE OF ALASKA ~. (:~ i ~,~~
5 API NUMERICAL CODE
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
Form No 10404
REV, 3-1-70
6. LEASE DESIGNATION AND SERIAL NO.
7. IF INDIAN 'ALOTTEE OR TRIBE NAME
GAS ~
WELL LX!
l.
OIL
WELL
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8 UNIT FARM OR LEASE NAME
3 ADDRESS OF OPERATOR
4 LOCATION OF WELL
OTHER
9. WELL NO.
TRAIL RIDGE WELL #1
10. FIELD AND POOL, OR WILDCAT
11 SEC. T. R. M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO.
13. REPORT TOTAL DEYrH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEYrH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
14
6/13/80
TD - 2700'
94' footage
30"D. @110'
20"C.@982'
14. I hereby certIfy that the foregoIng IS true and correct
SIGNED
TIH w/Bit #19 on BRA #14 (packed BRA). Reamed tight hole w/packed
hole w/packed hole assembly from 2080' to 2608'. Directionally
drilled l2~" hole to 2681'. Drill pipe torqued while drilling &
& Kelly drive bushing jumped out of rotary table causing D.P. to
backoff. (NOTE: Driller did not notify anyone that Kelly bushing
had jumped out of rotary and caused backoff). Pooh. Recovered
190' of drill pipe. Ran OEDP & screwed into fish @ 190' - picked
up on fish & drill string 50,000# light. Pooh. Left total BRA
#14 x-over sub on top of drill collars in hole. Top of fish @
2353'. Length of fish 328.31'. Ran OEDP - tagged top of fish @
2353' - OK. But unable to engauge fish. Pooh. Rigged cut lip
pin on bent joint of Grade "E" D.P. - engauged top of fish & Pooh.
Recovered total fish. TIH w/Bit #20 on BRA #15 (40' belly angle
building assembly).
Drilled 19' of l2~" directional hole from 2681' to 2700'. Drill
pipe torqued & Kelly drive bushing jumped out of rotary table
again causing D.P. to backoff.
R E C E f V r: ¡",:
¡.~ !~"
"I UL 1 [5 1980
AI:!.ska ('I! & (~.,.,
v v ~,,' " ,
A!1ch(Jfap~
"I
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise d,rected.
( SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
( - 'q r "." ~
, ...'u¡"-.
\..' ;; 1 fl'r. '
.. 11..6' !
5 API NUMERICAL CODt ,..
MONTHLY REPORT OF DRilliNG
AND WORK OVER OPERATIONS
I.
OIL 0 GAS r;¡
WELL WELL L..1I. OTHER
2 NAME OF OPERATOR
UNION OIL COMPANY OF CALIFO~~IA
Form No 10404
REV 3-1-70
3. ADDRESS OF OPERATOR
4 LOCATION OF WELL
6, LEASE DESIGNATION AND SERIAL NO
7 IF INDIAN 'ALOTTEE OR TRIBE NAME
8. UNIT FARM OR LEASE NAME
9. WELL NO.
TRAIL RIDGE WELL #1
10 FIELD AND POOL. OR WILDCAT
11 SEe. T R M (BOTTOM HOLE
OBJECTIVE)
12, PERMIT NO.
13, REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
15
6/14/80
2797' TD
97' footage
30" D.@llO'
20" C. 982'
16
6/15/80
2926' TD
2634' ETD
163' footage
30" D. @110'
20" C. 982'
14, I hereby certify that the foregomg IS true and correct
SIGNED
Pooh. Recovered 431' of drill pipe. TIH w/cut lip pin on bent
joint of 5" - engauged top of fish @ 431' & Pooh. Recovered total
fish. Installed new Kelly master bushing pockets, Kelly drive
bushing pins, Kelly rollers and bearings. Dressed off edges of
Kelly. TIH w/12~" bit 1121 on BRA 1115 (40' belly - angle building
assembly). Directionally drilled l2~" hole f/2700' to 2797'.
Directiona1ly drilled l2~" hole from 2797' to 2799'. Took survey
@ 2754' 330N57E. Hole angle & directional - as desired. Pooh for
BRA change. TIH w/12~" Bit 1122 on BRA 1116 (packed BRA). Drilled
from 2799' to 2926' - took survey @ 2842' 380N59E. Hole had built
50 & turned 20 right in 88'. Pooh. TIH w/Bit 1123 on BRA 1117 (15'
extended pendulum to drop angle). Started undercutting on low side
of original hole @ 2600'. Low side drilled 12~" hole from 2600' to
2634' .
¡--, 1""'4""'[!' .~.~'~
~"'t'~ .,,¡\j~.¡~
t ,\, ~ '- I 1,' ¡~ ~,",!
J uL 1. 5 198C
/,'.-...,. ')'I..f;,,' ',~,',:,!I"" \.,Jl,i¡;.-Ç",Cd
,.."\..,,.<,;;~ 'J ,:I< .. - ,
f..~¡1~!lrHa~:~
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
( SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
( CONF/œ- I
S. API NUMERICAL CODr¡;.!v rIAL
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
Form""o (0-404
REV 3-(-70
I.
OIL
WELL
GAS C1
WELL IJU
2. '\A\tE OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT FARM OR LEASE NAME
3 ADDRESS OF OPERA TOR-
4, lOCATIO:-.l OF \\ELL
6. lEASE DESIGNATION AND SERIAL NO
7 IF INDIAN 'ALOTIEE OR TRIBE NAME
OTHER
9 WELL NO.
TRAIL RIDGE WELL #1
10. FIELD AND POOL. OR WILDCAT
II. SEe. T R M. (BOTIOM HOLE
OBJECTIVE)
12 PERMIT NO.
13. REPORT TOTAL DEPTH o\T END OF \tQi'l/TH. CHANGES IN HOLE SIZE. CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLL'\ŒS USED, PERFORATIONS. TESTS AND RE:.SùLTS FISHING JOBS JUNK II'\¡ HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHA'IGES IN HOLE CONDITIONS.
17
6/16/80
2958'/32'
30"D.llO'
20"C.982'
18
6/17/80
3089'/131'
30"D.llO'
20"C. 982'
19
6/18/80
30" D. 110'
20" C. 982'
20
6/19/80
3405'/94'
30"D.llO'
20" C. 982'
14. I hereby certify that the foregolßg IS true and correct
SIGNED
Low-side drilled
If24 on BHA If18.
to 2772'. Pooh.
2772' to 2926'.
- undercut f/2634' to 2680'. Pooh. RIH w/bit
Reamed f/2600' to 2680'. Low side drilled f/2680'
RIH w/bit #25 on BHA #18. Low side drilled f/
Directionally drilled l2~" hole f/2926' to 2958'.
Tpok survey @ 2958' bit depth. Pooh. RIH w/bit #26 on BRA #19
(15' pendulum dropping assembly). Reamed to btm. f/2900' to 2958'
Directionally drilled l2~" hole f/2958' to 3028'. Pooh. RIH w/
bit #27 on BRA #20. (20' pendulum dropping assembly). Direction-
ally drilled l2~" hole f/3028' to 3089'.
Directionally drilled l2~" hole f/3089' to 3200'. Pooh. RIH w/bit
#28 on BHA #21 (16' pendulum dropping assembly). Reamed f/3l70' to
3200'. Directionally drilled l2~" hole f/3200' to 3261'. Pooh.
RIH w/bit #29 on BRA #22 (packed hole assembly). Directional1y
drilled l2~" hole f/3261' to 3311'.
Pooh. RIH w/bit #30 on BRA #23 for Dyna-D~il1 Run #5. Oriented
Dyna-Drill1200 left of high side for left hand turn & drop. Dyna-
Drilled 12~" hole f/3311' to 3378'. Pooh. RIH w/bit If31 on BRA
#24 (16' pendulum dropping assembly). Reamed tool run f/331l' to
3378'. Directionally drilled 12~" hole f/3378' to 3405'.
DFr'E
,- Þ~,' -jV',"P"'
t \, L \, ,'. j'~ ¡ ¡
, L IJ'
~JUL j 5 1900
t i""",n' J" (\ r.
';",d.",j".i'"<t)'~q¡.¡,,
\.. II I 'r, ¡¡
t>\l1cn'Jíar it;
'.
TITLE:.
DATE
NOTE-Report on this form IS reqUIred for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation commIttee by the 15th of the succeeding month, unless otherwise directed.
( SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
( CONF/I'I
5 API NUMERICAL c6¡,{[N] fAL
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
Form No 10-404
REV 3-1-70
I.
6. LEASE DESIGNATION AND SERIAL NO
7. IF INDIAN 'A LOTTE E OR TRIBE NAME
GAS I:ì
WELL .K-J
OIL
WELL
2. NA\fE OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT FARM OR LEASE NAME
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
OTHER
9 WELL NO.
TRAIL RIDGE WELL #1
10. FIELD AND POOL, OR WILDCAT
II. SEC T R M (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPTH AT. END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUM.ES USED. PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
21
6/20/80
3628'/223'
30" D. 110'
20" C. 982'
22
6/21/80
3774'/146'
30" D. 110'
20" C. 982'
23
6/22/80
4007'/233'
30" D. 110'
20" C. 982'
24
6/23/80
30" D. 110'
20" C. 982'
14. I hereby certIfy that the foregoing IS true and correct
SIGNED
Directionally drilled l2~" hole f/3405' to 3576'. Pooh. RIH w/
Bit #32 on BRA #25 for Dyna-Drill Run #6. Oriented Dyna-Drill
with SDC steering tool 1200 left of high side. Dyna-Drilled l2~"
hole f/3576' to 3628'. Trip for Bit #33.
Oriented D.D. 1200 left of high side for Dyna-Drill Run #7. Dyna-
Drilled f/3628' to 3698'. Trip for Bit #34. Oriented 1200 left
of high side for Dyna-Drill Run #8. Dyna-Drilled f/3698' to 3774'.
Pooh. RIH w/Bit #35 on BRA #26 (34' pendulum dropping assembly).
Reamed tool run f/3576' to 3774'. Directionally drilled l2~"
hole f/3774' to 3937'. Pooh. RIH w/Bit #36 on BRA #27 for Dyna-
Drill Run #9. Oriented Dyna-Drill 1200 left of high side. Dyna-
drilled l2~" hole f/3937' to 4007'. Circ. & condo mud.
Pooh and lay down dyna-drill. Rigged down S.D.C. P.D. and RIH
w/Bit #37 on BRA #28. Reamed dyna-drill run f/3937' to 4007'.
Drilled l2~" hole f/4007! to 4011'. Circ. and made 15 std. wiper
trip - had no tight spots or fill. Circ. and condo mud. Pooh.
Rigged up Schlumberger and ran DIL-SONIC-GR, FDC-CNL, and HDT logs
f/4005' to 982'. Ran sidewall core gun.
D r ;r" f" j '~ f! ? ~~"
f~ t~ ~ ~"! ¡ ¡ >" '
"'-"-""i.~¡V¿L.';
¡ ¡ ~ I ~ r- 1Q8'"
d "J to J 0 ,"If ,~{,
AJc.Gka CHi & (j q ! ,I,'
t\fV'jl1". r¿i(À'3
"
, '« ,". ¡
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-404,
REV ,3-1-70
{ SUBMIT IN DUPLICATE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
(
COAl t1/J.;
S. API NUMErJUIJ.uclv17//L
6. LEASE DESIGNATIO"'l A"'ID SERIAL NO
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
I.
OIL
WELL
GAS Ð
WELL
2. l'oAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT FARM OR LEASE NA\t.E
3. ADDRESS OF OPERATOR
4 LOCA TIO:'oJ OF \\ ELL
7. IF INDlAl'o 'A LOTTE E OR TRIBE NAME
OTHER
9. WELL NO.
TRAIL RIDGE WELL #1
10. FIELD AND POOL, OR WILDCAT
11 SEe. T. R M (BOTTOM HOLE
OBJECTIVE)
12 PERMIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUME:.S USED. PERFORATIONS. TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
25
6/24/80
17~" hole
f/982' to
2000' (1018'
opened)
30"D. 110'
20"C. 982'
26
6/25/80
4011' TD
17~" Hole
f/2000'
to 2816'
opened)
30" @ 110'
20" @ 982'
27
6/26/80
4011' TD
17~" hole
f/2816' to
3298' (482'
opened)
30" @ 110'
20" @ 982'
14. I hereby certify that the foregoing IS true and correct
SIGNED
Ran and shot 45 sidewall cores. Rec. 22 cores. Rigged down
Sch1umberger. RIH w/17~" H.O. on BRA #29 and opened 12~" hole to
17~" f/982' to 1610'. Hit bridge w/bu11nose on hole opener -
could not work thru. Pooh. RIH w/12!r." bit and reamed bridges
f/1610' to 2060'. Circ. bottoms up and Pooh. RIH w/H.O. #2 on
BRA #30 and opened 12!r." hole to 17~" f/1610' to 20ÖO'.
Opened 12!r." hole to 17~" f/2000' to 2075'. Pooh. RIH w/H.O. #3
on BRA 1130 and opened 12!r." hole to 17~" f / 2075' to 2442'. Pooh.
RIH w/H.O. 114 on BRA 1131 and opened 12!r." hole to 17~" f/2442' to
2816' .
(816'
Opened 12!r." hole to 17~" f/2816' to 2878'. Pooh. RIH w/H.O. 115
on BRA #32 and opened hole f/2878' to 3292'. Pooh. RIB w/H.O.
#6 on BRA #33. Reamed tight spots f/2790' to 2837' and 3227' to
3292'. Opened 12!r." hole f/3292' to 3298'.
R?=FEi1f'.!
,~,.~" "~~\1\,"
\'/!.t-- ¡'It"
, U L ,f¡ r~ '1t')B"""'<
\..,' 1[' ,-;~..~
AI!:.s!(~ .:¡¡, ¡~ (~- t,
tn(;I1,\,,"-'
TITLE:.
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
011 and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
{ SUBMIT IN DUPLICATE ('
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
0
Form No 104M
REV 3-1-70
l.
OIL
WELL
2. NAME OF OPERATOR
GAS 0
WELL
3. ADDRESS OF OPERATOR
4. LOCATION OF WELL
LO¡','F¡'DF¡1f7-, "L
5 API NUMERICAL COJE 1\ ,
6. LEASE DESIGNATION AND SERIAL NO
7 IF INDIAN 'ALOTTEE OR TRIBE NAME
OTHER
8. UNIT FARM OR LEASE NAME
9 WELL NO.
10. FIELD AND POOL, OR WILDCAT
11 SEe. T R M. (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
28
6/27/80
4011' TD
17k-" hole f/
2 ,
3298't03589'
(291' opened)
30" @ 110'
20" @ 982'
29
6/28/80
4011' TD
17~" hole f/
3589' to 3756'
(167' opened)
30" @ 110'
20" @ 982'
Opened l2~" hole to l7~" from 3298' to 3589'.
in 18th joint of HWDP above jars. RIH w/H.O.
tight spot @ 2979'. Reamed f/3500' to 3589'.
3589'. C & C mud. Pooh.
Pooh. Found washout
#7 on BRA #34. Had
Found bridge @
RIH w/R.R. l2~" bit #37 on BRA #35 for clean out. Cleaned out
bridge f/3579' to 3610'. RIH to 4011' and circ. clean. Pooh. RIH
w/H.O. 117 on BRA #36 and opened l2~" hole to 17~" f/3589' to 3756'.
6/29/80 Continued to open hole f/3756' to 3826'. Pooh.
4011' TD BRA #36 and opened l2~" hole to l7~" f/3826' to
l7~"hole f/3756' w/H.O. #9 on BRA 1136.
to 3980' (224'op.)
30" @ 110'
20" @ 982'
30
14. I hereby certify that the foregoing IS true and correct
SIGNED
RIH w/R.O. #8 on
3980'. Pooh. RIH
, r . ,
, . ,I
,c '-' .~ ¡ "
,I' f - ~", ,'.
~. . " ,I " , ~ . '
l
r ,-
. -JH
f,: pr 111.. r ?I \\
TITLE
DATE
NOTE-Report on this form is required for each calendar month, regardless of the status of operations, and n'tust be filed In duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
Form No 10-400:
REV, 3-1-7d
(" SUBMIT IN DUPUCA TE
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
( CON!.
5 APi NUMERJCAL cÎJJ£NTtAl
MONTHLY REPORT OF DRILLING
AND WORK OVER OPERATIONS
OIL 0 GAS r"O'
WELl WELL ~ OTHER
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
6. LEASE DESIGNATION AND SERIAL NO
7 IF INDIAN 'ALOTTEE OR TRIBE NAME
8 UNIT FARM OR LEASE NAME
3 ADDRESS OF OPERATOR
9. WELL NO
TRAIL RIDGE WELL #1
4 LOCATION OF WELL
10. FIELD AND POOL, OR WILDCAT
11 SEe. T R. M (BOTTOM HOLE
OBJECTIVE)
12. PERMIT NO
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS, TESTS AND RESULTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS.
31
6/30/80
4011' TD
30" @ 110'
20" @ 982'
Opened l2~" hole to l7~" f/3980' to 4011'. Circ. clean.
Strapped out of hole to 20" shoe. Waited 1 hr. RIH and
found 26' fill. C.O. to 4011'. Circ. and condo mud. Pooh.
RIH w/locked-up BRA #37 and found 25' fill. C.O. to 4011'.
(Have 5-8' of fill while working pipe 30'). Reduced pump rate
and worked pipe 5'. Made 15 stand wiper trip. Found 3' fill.
Circ. and condo mud.
r""" '¡e.,
,I, ;~,:\:)~:;
, ,. ,'k'. .'.
l ' ..-"./,
" 'f .
" ,I ,~ "
,. .
...
(¡ "
" "
I, ,
,;
i " ;~, "I :
14 I hereby certify that the foregoing IS true and correct
SIGNED
TITLE
DATE
NOTE-Report on this form IS required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the
oil and gas conservation committee by the 15th of the succeeding month, unless otherwise directed.
(
,
t
!
( ,/
('
/
,.
At.lQA on. AND G\S ~~~txJ.M:rssIœ
!!)
...
< .
Boy 18 H . ß8milixn
C!1.i ~ ...,i m
IJ!u::u : Iø:mie C . Sn:l th 1¿,~
0 ...wl ~.i a18r
"
. '
JUly 7, 1980
.
.
~, ,
Bobby Fc6 Ler í{. ~ ~ ,
l\!.lnl1-."" 1't)~
..
"
witness B.O.P .E. test. œ
Uniœ Oil' s Trail Ri&]e i 1
Sec. 3, '1'2ON, RlOW, S.M.
Pemdt No. 79-72
.. .
.
..
"
~. " July 2, ~80 - I t..Ø;, ~ >\ ~ . èJl!.1;e. . tp ~~ Oil' s Trail
1 to witneu tbia ,\'tX).\ipq~~,Ç~1?~~. .~. r '
AI <II
'1b:,~ ~y!c, ~80 - 'Jb8.~~'~t,~,~".~.~1; ~.á,45 a.m. ,mXI was
oœc at: 2145 p.a. fJ.be \A"'~." Ø'811! valve fa" 1f1ð anu Mr. Dodge,
:Br~bJf'f tco1 pasIwø:, told JI'I!?: ~ ~ :~ ..~ ,~"ft~ as sqcn 88 œe
001,1 d be f1alm to tœ loœticD.. .. :~ . ~~ ~ C?f the test axe ~
to this ).~ t..
r .> ~:., ,. \ ") ."
1: ..
In '"'\'\_~"."Y: I wit:n888ed the B.~~~.~~ 4~ œ 1Jn¥n's Trail Ridge tl.
" ..
A~\t: '
~, JUly ~, 1980 - Mr. ::.1m ~i ,: ~~; ,~ Drilling ~, cal-
_êtea the A.O.G.C.C, . ãl-"~,,~#c?e ~ infoxmed them the q;ptr Relly
val \1e had. be81 dumged and te .
~ . , , , '
..
BF:ng
1!bcl.
'!!o- ~
~ '." v , .
. . . . - .
- -- - - - - - -~ - - ----- -- - -- --'- - ----
.
\.J (" U tt ~
4/80
(
STATE OF ALASKA (
ALASKA OIL & GAS CONSERVATION COt-1MISSION
B.O.P.E. Inspection Report
, ,
Inspecto~o b~ r;~¡¿ ¿
Operator U 1V,'0 /1/
Well ~f)" / ¡;:fJ~ Ji /
I
Location: Sec 3 rxí!OtlR/OW 11
a. . L/ /, "
Drilling Contractor/~£IIJ ~í..rl,'-
S .YÎ1
R~g #5 q
Date 7- 3 - 60
vJelI~/ ¿J JI1 ' / rI/, J.- ¡! /
r r" I . __'" (~->~.-1 e:'.
Representat~ve 5 ~ o~J'-1 A IJe.~
Permit # 79 - 7 Z
J3-:7cas~ng Set @L/iJoB ) ft.
Represen ta t i vpJt:"-£ C.l71 €.. ))0 c! de .J
I
---
, Location I General
Ol{
General Housekeeping
or
ACCUHULATOR SYSTEM
Full Charge Pres sure,-)oón ps ~g
Pressure After Closure /~L1l ps~g
200 psig Above precharge Atta~ned: - minJO Sl
Full Charge Pressure Attained: 4 min4s SI
N2/Boor / SSo) j9,s°1 /q'aÖ ps~g
Controls: Master Lf e$
RemoteUê ot:) Blinds swi tch cover U e
t _. I
\'Jell Sign
{o!:
Reserve pit
Rig
0/
o£
BOPE Stack Tes t Pres sure Kelly and Floor Safety Valves
Annular Preventer / d.SoD ffippe r Kelly / Test Pressure ~UJ
Pipe Rams ¿ $Oð Lower Kelly / Test Pressure ...lOC)D
Blind Rams / "-~~ 00 Ball Type J Test Pressure £~OÐ
Choke Line Valves / SoIJD Inside BOP / Tes t Pres sure Iv /7"
H.C.R. Valve / '- 5Doo Choke Hanifold ~ e Test Pressure '- )oD ö
¿ 5006 /4
Kill Line Valves No. Valves
Check Valve I SÉJi>O No. flanges -34/
/ pC'_' ;
/
Ad] ustable Chokes /
Hydrau~cally operated choke
,
Test Results: Failures I TestT-ime- T€J-----~.--
Rèpair or Replacement of failed equipment to be made within ~. days and
. .
Inspector/Commission office notified.
Remarks:~~ {)¡Jp-/~,!t)/-'? ~J,n5 j/p.' u //e/l. /'/4 (~/'-)ue jc;4:A(/~
- I1J Jï) i~ /,e t~(! e J /
.-:-- /1 / IJ" ! "::J I' I' '\ / /)/ / I'../) - ...J~
:t ,r.<?¿o~5'¡-::d , r:1Y' -- r---, (') I~ t"J /1 ~ IJ/I'>~.:£" CA.J ¿;/'<X'í./r 6 Y..JY"- )
~ ¿e.¡Ú eóJ IN /11 JÁe !/C .J4/ð<" !'/C5:;:vl:: C j../" ;:j~~J,¿ o-J
j;J1!C! (//7) /) //J/-o¿ -bC J!¡e~ I
Distrlbution
orig. - AO&GCC
cc - Operator
cc - Supervisor
I ns pee torjJ~~ {/ ~it~1~'
.
ADL 1156870
'I)
1.";/) ,'"
I~ r~
A~.\
'Jf
~
1~~
7
I
Form No 10-404
REV 3-1-70
SUBMIT IN DUPLICATE (JNFIDENTlAl
(
STATE: uF ALASKA
~..- -,-".,':G)tL AND GAS CONSERVATION COMMITTEE
,'I",,>,'r~ -.~,j¡ -\J
, I . ,"'" . , 'C¡ I..
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
l.
OIL 0
WELL
2. l'tAME OF OPERATOR
S. API NUMERICAL CODE
50-283-20065
6. LEASE DESIGNATION AND SERIAL NO
GAS rvv
WELL ~
7. IF INDlAN'ALOTTEE OR TRIBE NAME
OTHER
8. UNIT FARM OR LEASE NA\Œ
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERA TOR
P.O. BOX 6247, ANCHORAGE, ALASKA
4 LOCA TIO:'II OF WEll
99501
9. WELL NO.
TRAIL RIDGE WELL #1
10. FIELD AND POOL. OR WILDCAT
WILDCAT
1068.51' S & 38l.5l'W of the N.E. Cor., Sec. 9,
T20N, RlOW, S.M.
II SEC T. R M. (BOTTOM HOLE
OBJECTIVE)
Sec. 3, T20N, RlOW, S.M.
12. PERMIT NO.
79-72
13. REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET AND VOLUMES USED, PERFORATIONS. TESTS AND RESuLTS FISHING JOBS JUNK IN HOLE AND SIDE-TRACKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOLE CONDITIONS
A
B
C
D
E
F
G
H
Commenced rig-up of Brinkerhoff Rig #59 @ 00:01 hrs. 5/19/80. Cont-
inued rig-up thru 5/24/80. Rigged up and drove 30" drive pipe, using
Delmag D-22 drive hammer, to a depth of 55'. Had 23' of soil pene-
tration and final hammer rate of 300 BPF.
I
Continued general rig-up. Strapped off 30" drive pipe. Cleaned out
drive pipe to shoe @ 53' and drilled l7~" pilot hole in boulder below
30" drive pipe to 56' in 9 hours.
J
Drilled l7~" pilot hole f/56' to 110'.
110' .
Opened hole to 26" f/55' to
K
Drove 30" drive pipe from 55' to refusal at 110'. Refusal was 288 BPF.
Cut-off 30" pipe and installed flowlines. Cleaned out 30" pipe to 104'.
L
C.O. drive pipe f/l04' to 110'. Had some junk at shoe of 30" pipe -
cleaned out junk. Surveyed @ shoe of drive pipe. Installed 30" hub
and 20" 2000# Hydril.
1
5/31/80 Installed flowlines. Spud well @ 6:00 hrs. 5/31/80. Drilled 17~" hole
110'/481' f/llO' to 233' w/bit #4 on BRA #1. Stuck pipe. Worked pipe free and
30"D.llO' drilled l7~" hole f/233' to 481'.
r :- ;:~ f: , V t D
tl J I'J 1. :L 1980_,
Q AJ:.ska Ol! & C, , t j!l~ vù¡¡hm~$fon
14. I hereby rufy at the f9reg~trr;sl c~ect , /J" A.nchoragt .
SIGNED -.r~ ~ (.á/Þ;,,('d:'~ Dist. Drlg. Supt. DATE 6/5/80
N""'~ort on thIs form is required for each calendar month, regardless of the status of operations, and must be filed In duplicate wIth the
~~P~nd gas conservation commIttee by the 15th of the succeeding month, unless otherwise directed.
-~---~----------~-
t
(
. Alaska Oil and Gas CmIlATVa1:iœ C'.cmni ..eti ("8l
Fi1ss
M8xd1 10, 1980
. ~
.
.
.
:RnfuIAll A. Dcø¡1BAA 1)
rau.~1eun BøJinøer )'
41 . . . ,
,. . Fuel ~1', ice
:road near Uniœ' s
.. 'l'railridge J.ocatiœ .
~ ..'.'
, .
.. ó.
en Set t.mXIay, MaJ:d\ 8, 19 80, I xØi ~ a œll !ran Jim Ctt 11 ender, Uniœ .
Be iDf<l' tH :\ DB 1:hat t1niœ ~: ~ : ~ ~ : 1?0 t1Je 'J.'rai]%idge .
1oca1:iœ had encøm.temd a ~. q1;~ ,~ .., " ~ ~ 80 ~ ' '. l7\A of
fœl BJ;\i' ,1eð fD:JI\ it. " . - ~ ,. .. > ~ , ,,~ ., -. ..
~ ..
'1M t:x:\dt .. net QI;Lœ' s nor ~ . ~1: ~ ~ . ~~\X,~ . iR . ~. . No ~ ,
efforts ~ ,-.1r"", -,... and tHe ~'~"'-A'" or I"ft!itJr"tfata of the whic1e
CCAddnotbe ~~~:~.:i#':.. ~'~œ.~(d,IJ;,A '
W8Ø 11Otifiad .
....,.t.., ..".~"
~...
.. .. ' " to xa-" . :ties of the incident and oou1d not.
"a ~ the œc~ ' . . ':f 'tò1ð.lWit 'j ~ ~fIi a'r.cb 1:ð
ÇII8t ~ ~.. ~""." ,.' '\' " '
CMr of.. "" for the J8(Ø:d aDd if. :~ ~~ .~.,~ 4 ~tiœ of ~ œ3:1 to
D8 tbey oou1d call œ.
.' .',. " .
. ,
- - -'- - - - -- - - - - ~ - - - - - - -- - -
99502
¡/JIr
<1-t~
5. API NUMERICAL CODE »
50-283-20065 K
6. LEASE DESIGNATION AND SERIAL N~
ADL 1156870 'W~.
7. IF INDIAN, ALLOTTEE OR TRIBE NAME ~
ì~~
y¿
('
Form 1~03
REV. 1-10-13
- (
Submit III ntentlons" In Triplicate
. IISubs8Cuent Reports" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT-" for such proposals.)
1.
OIL 0
WELL
GAS 0
WELL OTHER
Exploratory
2. NAME OF OPERATOR
UNION OIL COMPANY OF CALIFORNIA
8. UNIT, FARM OR LEASE NAMt
3. ADDRESS OF OPERATOR
P.O. BOX 6247, ANCHORAGE, ALASKA
4. LOCATION OF WELL
9. WELL NO.
Trail Ridge Well #1
At surface
1069.58'S & 329.03'W of the N.E. Cor., Sec. 9, T20N,
RlOW, S.M.
10. FIELD AND POOL, OR WILDCAT
Wildcat
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 3, T20N, RlOW, S.M.
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
216.6' Above MSL
12. PERMIT NO.
79-72
14.
Check Appropriate Box To Indicate Natu.. of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
-
TEST WATER SHUT-DFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(Other) Revised
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
WATER SHUT-oFF
FRACTURE TREATMENT
SHOOTING OR ACIDIZING
(Other)
REPAIRING WELL
ALTERING CASING
ABANDONMENT*
choke manifold --.&. (NOTEI Report results of multiple completion on Well
Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work.
In order to meet specifications the choke manifold will be reworked to conform to
specs, as per the attached diagram.
Rrr-t'",,¡ .
t l t , \ f- [)
F~t: 2 [) 1980
A/:ska Oil & (; ,~
An C hl.} ( ,I.'>:.
¡ ,
16. I hereby C~:~lfY that thae fo~regldOlng tis true and correct
/' Dist. Drl . Su t.
SIGNED>- /~ - ~ JtJ 'ØA-f L ~ TIT»E ./ðn g p
;d to::. -///.Â.A~-iA 7/./
(This space for State offlcrse) ~f í
1.... '- f?" ".f COMMISSIONER
APPROVED BY u/ ¡;,~ ( --I~ TITLE
CONDITIONS OF APPROVAL, IF AN: BY ORC
EA OF THE CO~~~,!r;~'O~J
DATE
2/25/80
DATE
2-/2-Cr;/B(j
I,~.o"'r' .".:
""'\~¡-' .~'C<~
cpy
~¿:~'lJm.){!
See Instructions On Reverse Side
..21.;'1" }~
..
lEV.
DATI
FORVJ 247 (NEW 5/661
N;
-
;
...
"
(
Bu. b~\ 4l
,oA ~\:.
(
t'>é lA~~~
:1
-
1./" V X
I
AU~\\..\~~~ X r I ~o~rt'\ve:
<!.~O"E C"'O~E , AO7-
C"~b.
,
I X X
X
~ ;XJ
. -
1./"
~"
J
ì
~
'\
Lj"
~
13 5/8"
5000 psi
CHOKE MANIFOLD
~\\
W.P.
UNION OIL COMPANY OF CALIFORNIA
~
/
R ,.. l'~ E f %V' . ~. ~
'\" t l, .. I t C)
í':~ .-~' f) ~9 1('\
\. .:t; lJ G ! ~Á}
A¡~"v" f\,' iI. "
.~",)p,¡;;: '~i' L'JC
Ar: '"nu! d' ~¡:.,
jì
DIAWN '3"S>' I CKD.
AP"D.
SCALI
DATE :;).-~'S - ~
SHEETS I ~Hm
Form 10-403
REV. 1-10-73
(
(
Subml t "I ntentlons" In Triplicate
& "Subsequent ReportS" In Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
5. API NUMER ICAL CODE
50-283-20065
6. LEASE DESIGNATION AND SERIAL NO.
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT-" for such proposals.)
1. OIL D GAS n
WELL WELL~ OTHER
2. NAME OF OPERATOR
ADL 1156870
~~"'" '
/
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
3. ADDRESS OF OPERATOR
P.O. BOX 6247, Anchorage, Alaska
4. LOCATION OF WELL
99502
9. WELL NO.
Trail Ridge Well #1
10. FIELD AND POOL, OR WILDCAT
At surface
Wildcat
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 3, T20N, RlOW, S.M.
1069.58'S & 329.03'W of the N.E. cor., Sec. 9, T20N,
RlOW, S.M.
13. ELEVATIONS (Show whether OF, RT, GR, ete.)
216.6 above MSL
12. PERMIT NO.
79-72 --
14.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
TEST WATER SHUT-OFF -
FRACTURE TREAT
SHOOT OR ACIDIZE
PULL OR ALTER CASING -X-
MULTIPLE COMPLETE
ABANDON*
-
REPAI R WELL
CHANGE PLANS
X
-
WATER SHUT-QFF
FRACTURE TREATMENT
SHOOTING OR ACIDIZING
(Other)
REPAI RING WELL
ALTERING CASING
ABANDONMENT*
(Other) (NOTE: Report results of multiple completion on Well
- Completion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, Including estimated date of
starting any proposed work.
r,
7¿--;-
)/.
<~
..¡Z
~
()
V
allow setting
allow additional
The procedure and casing program has been changed as follows, in order to
an additional surface string of casing to protect surface ground water and
safety in drilling prior to setting the 13 3/8" casing string.
PROCEDURE:
1. Drive 30" drive pipe to + 100'.
2. Drill l7~" directional hole to + 1000' .
3. Open l7~" hole to 24" to + 1000'.
4. Run and cement 20" casing-at + 1000'.
5. Drill12~' directional hole to + 4000'.
6. Run logs.
7. Open l2!z;" hole to l7~"
8. Run and cement 13 3/8"
9. Drill12!z;" directional
10. Run logs.
11. Run and cement 9 5/8"
12. Drill 8~" directional
13. Run logs.
14. Run and cement 7" liner at + 18,000'.
15. Test and evaluate upper, middle and lower tertiary zones.
16. Complete or abandon well 'as justified by logs and testing.
to + 4000' .
casing at + 4000'.
hole to + 15,500'.
Rt""'/f"'>.l""
~ í ~ ( , ,
i,..\. ~¡"j'! f'"
,
, 1,-
"'" -- ('
I 'I,. ,,/ '" 1f\\~""
"-, ,(; l ~.,;h"¡'(1
AicSka. -Jil & ~ "
casing at + 15,500'.
hole to + 18,000'.
Ani)!}\-! ~
...~;;.
¡ I'
I hereby cer. fy that the foregoing Is true and correct
DATE
2/20/80
DATE
.3/Wd
\
See Instructions On Reverse Side
AppmŸecI CoPi
returned .
.3 . '- 80:~
~
\
I
¡
;...
I
i
,
,
e. t:. '.oJ... ~ ~.
~AD
(~
~\ '(:\~~~'N'.
£-i(
~o" ~QOO p~'
M '1 \) a \ t- t:\ ~ ~ E:.'!V\ ß '- '{
- t
u.~E1J \0 t>R\L.,", \.,-,(1.\' lC:!: \ceo
F \.. CU) \... \ ~ E..
;
L~ '1E. '-
~
..
ð
£.0"
~ r...t) un... \ ).1. Eo
R\~~
. ,
~o\\ ~OOO f~:
t\ l( ~?"" \ ~
~I
I'
O). ..'
þ,.
~ .
~
_.~
()
30"
: DR\U~ f\PE.
'"
>
~
r
1
t f.....'., .;.;
I
I
/
\
~~
~
.¡;:;¡'
-.:
,.:;>-
- , ' . ~)
~ ,~
r/
í .- k'~'
.",,11
J ,;¡ "I Î;.\[ d,:¡¡¡
. '¡/S8Il,
~ÐU
d-û{O 0 " ~ ,
. .
~f\ÑDINt, "l}ß
:to " CAS'" N l..:r
çoR"
ó
,.
'i
L\ ~E:.s
R€.L€. \ F
:rR\Å
\, d. ~ -g.C)
-----
o~- s. e -\
'\iè}J:
"
~
I
":3¿\d "3('\\~Q
"at
\ 3f\~,
G \:Jci
.~~"'r\~~
ç-=3~ "
::\\ "3'~~
.,h
ÿ
e
öo~
.r"} N \'3 'd::> "o""c
\cif\'ñ G)NIG N\:1'\
~
~
""
~
.~
"
m<3'\~T'^
~ "'c:a .pç:
~
~
~
..
.Þ
~ ~s \~
"Ot
¡'"'
.' / ~ \oJ , '\ (Y'I 0"1 ::J
\
,°0<\\;0-\. '\;~;) ~.~ \'t"\'1~ U,,",\J
"he Ol.. '3"'\~ "eJ.L..\ W::¡dO 01.. ~3~ n
. h ~~ ti 'O-3~t~ - "G~ )
) ~ ~ ~ tf~G)e\G '
- - ---- -- -- __n
. - - -- - n - --- --- -----.- --
- -~
- . n. ---~---."""---'---
- - 0 tQ- '3 -e -,\- "
')Yð ~
..
,.
..
"
.
"3d\d "'3(\\~Q
\\ O<¿
r
'" \/
- \Q~ \) ...Q-e
\3L'~\
C)clc\
-b \:r,\ -:J ~
.
..
.
" ,
L --.'
.
. \,O~ ~Q. ~~bt\~\'i
- ~ "" "\. M 0"'\ :1 \'It, M
-ad"ð 3"'~Q ,.Q~
~\ ~\\ \"V\'V~\:\'\
~,Q-e
"~
f,~
'~
"-
'3 \'I , ..., 3~o \1 ~
"~ 0-\ ~ 'f~~~'Sc; "t1C:> ~\:#:JM
'b~-=> ~ <;d QOOe ,~oe
~
\
-
\
/
\!
~,..,., ~,,~
/1
. t .
"
.)0'
\\~àò~'
: sðOQOe'
"oe
.
I .
..
à~'~ ('AQ"1-:}
i}?Jb\~
Q
~"" ~m Q....-'
.... \ -
"oe
,aoo\, ~ ~\\c¿/£..~\ ...l.""~~~~ G~~
,QoClb ~ °+ Ò--\ßt\ \I~/,L\ ""'\\~Q a.l.
~
\J ~ì1 h, ,,\"Vv\ èJ"~~tJ "" \~O~ '"' ~..Q-e
-) t ~ ~ \jö>"H:.I \0. )
, -
" -
~.
~
V£NT~ ~ r
. '" ~
~ ~
.
('
(
..
..
I
,
,
!I
~
r.
~ .
"
I
!
~ ~:AUX/LIÅRY
CHOKE
~
j
J
;.. .
1
~
~
I
¡,
~
,
\ t.
* II uSed.
I(V
.
-
.
l
)
1-
.
~-
~~
')
ADJUSï.4BLF
CHOKE
'-lOTE :
.
ALL CHANGES MUST HAVE WRITTEN
APPROVAL BY THE DISiRICT
DRILLING SUPERiNTENDENT.
~
::¿
~
~~
'-J
~
~
~
...
---
("0
... -
~ - ::~r!i ~ :!,'-::: ~ ~ \~~~~.?';:~ : ~ ~~., ~~ -~ héJ:' -;~ ~" :;;,: ~-;.: o¥;,~;::,,~ f~'Z~;; ~1 ~~1~if~~~ ;~:~~~-ft;~~~ ~~;z::;~~~-;;';¡;~
.
. . BUBBLE. TANK
on 1I00~fE ¡lADE DE GASSER
~
~
. .
..
'"
:E~ ~~
VALVES .......
.
. 1
]
. 4"
. .
,
POSITIVE
CHOKE
/..
.
----
. .
-
...'
Jÿ-
I
1
.
""-
...~
. OJ GAVGw .
l/o
. ~
4"
.
'-.
. ..
.0-/
.
. .
..
.
.
. .
. .
.
.
.
Un/cn »'1/1 Ivrmsl1
.
DA r f
.. '"
t
,-
/,fIN/MUI,! STAI,'D/.RO CiIOK£ I/AI/IFO!O ASS£I,/PLY
~
..
.
"... ^ . I "') ^ .. '\1
" ,..
,...AI ".,,""'."A
"L..":Ic~
""~J
DrAWN ::)
Af'.O. H B \
SCAle _Ncn e
010. H 9 - 2-¡ ':";)
- - - ----.
1-
- ,
( ~\~('.,R.~ ~ ~ '-\ (.
." .
-, "
\3 ::>/8 ~ 000 O~.I \nÐ~ s\~~c.. ~
.
,0 O~\LL \"L'/c.t'\ \'tD\~ \0- ~ \ 'S 350'
AI'lO ee,V\\.E."-\'\ 9-;¡~" ~ \S"'3S"t>'
, '" ,
\...IJ
1
~
L
I
° I j
, BLIND RAMS ~/- ~ ~
I .-¿_o- ~-;7' 0_- -
-. , ~ i .
. ) S .. ) 5'.
- . t 3 Vs sopo f~-. Dou.\:.1-t ~ . . ! . ~ P/PE RAY.S
, ~ I . -V H HYOR,
I -~---- 1 U#Lv"C
. . --. - - ~-..~ r'l~ c.
I ~,~~ '
I 1'..-."
. CHECK VAL V£ . . 7 . !¡~~ / '.
~ \ I ! . \ I~ lý GAT[ O.?
Ñ J . L- ~BÞ /' LO-TORJ:J[
; frp ~ ~: '~~ìL-m-(~5~~-tl:Ø~íf . ¡ ~"\-J~J'rP . I : op /Joø I)
. :JJ}-~~~J~,~~:;:Ji.-LIll--'-~-¡::..Q:r~;;b~:.r ~~_..:.. j ft, ""à< .
/~ ~....# . I {~J ~~::;;/ LJ-'-\'"~ . ~\J.J-Jr - rnð/'lilold
-' . I I~' '=" II
. (i;!F Oil If}-TO/?{;tf: '- -\ . .
~~'--l .
GATE ~'lZLV£ t~. ~ ú'ATE VALVE R£O:IIRE[) .
-' I
-.--t- -.
(
U~E~
,. ,
- +-.-- - '""~J -{~
'" '-. ~J....l
- ,
)
°
'/ \\
l3 ~/g St?°D f~:
g,~,\~
l
u
/
r'
I
\
I
~
j
-
HYlJ/?/L
\~-:)t" ~ooo f~;
ANGLED FILL UP L/I.'[
PIPE RAMS
1
;)0'" ~E>O()~: )C r3~J8" 5000 f~:
r' 0 0 c!~~ ~PO()L.
I ~ . J I 'ZO" deeD ¡>~; .5o0.~ ° C!>~ H~Ad.
r I ;)ou. <!""~ttU. \", NOTE: .
. L . l.....J ALL CHAiiGEŠ ~IUST HAVE: WRITTE;~
~~~~~ .)( A??RQ\'AL BY THE DISTRICT
, (fJ¡.~'t~ . .
~D \ CR.l~E p\f'e. ~ OSILUt.G SU.PER It~TEr,DEr:T.
"- ¡ :,,-1( j
.
¡:IR~-J81.
.. I
~ ,
~ -- I
- -----
;;
_(IV
~t.a.WN
ST.4NDJRD 4 PP.[V[.'/T£R A5S£I.f.9LY
.." 0
sc A¡l ,\:"11#
, :>.a.1 [ -::¡-.--:-----
--
--- - -..-
--~"--::~';::-;;: .~-~- -:'- -~;;~.'I::;"""->..-
.- - --~ ---- - - - --- -- --. --_.- - - -- -
-.-.-..,----. .---------..=...---=----- -- - ----.--
-- - ~~
(~
()
,\'
TRAILRIDGE III CSG. PROGRAM
HOLE CSG. WEIGHT GRADE THREAD DEPTH CEMENTING REMARKS
30" + 100' Driven To Refusal
24" 20" 9411 H-40 ~ Buttress =1:1000' + 1000 CF of Slurry
l7~" 13 3/8" 68 &61 K-55 Buttress +4000' + 3500 CF of Slurry
-
12~" 9 5/8" 4711 S-95&N-80 Buttress +15,500' To be determined by Logs
8~" 7" 2911 P-llO Buttress +18,000 + 600 CF of Slurry
)3;}/g" ty 9.5/8" ~ ~
"'20'1' CIf' ? II'
~CJK
~þL-
~~~~ß':>£. AJAc-Þd ~ ~)'-
~. ~ ~ ~~ .
fL ~ z - 2;¿ - 1?o ~ 2 <4p",,: ~ .-.-~~
~ . ~~~~
~ r~ 306011~. ~ ~ ~~
-
~ ~ ~- /9 p-,- /
~~~~CL
;;;;t/ ~
2-2.2...-80 .
~
~~~
¿ö ,.,
i:1
~
7 ,1
#I
\ TELL
(;ASING ~'TRrnG
f'..ASlliG SIZE
Bottom
1°O(j
FŒ'vJ. CR-13
1/72
~':¡It.Rn6~# I FI~W
COŒITY
;:cr.:: SIZS
nrrrnVAL
I.EX~7}!
LZSC?c:LPTIO!f
Top
'tlt.
G:-aà.e
0
JODO Cff# H-l./ 0
(¡b~øo )
lido () 1.)000
--
--r--
¡:1
0
~ .,4
0 OJ
orl Ó
!11 G)
¡::¡ ~
~. 0
',- .......
:. ;.
. .
.... ~
111 OJ
-.J ..-4
f1' en
G) (\)
~ 0:;
.. G)
IX> OJ
PI ~
~ ~
0 0
u u
,-
"
)
¡
¡..
~r
,<
.~
t-
,~
.,
r
)
, V
\ e.
" K
<,to
."
I, ~
~ f,
~ (,
1 .,.
t' .
"~, \
~ "-
.
3000 2':; ¡CJ-IIO
Y=~èns:le Lo~d/Plpe Yleld Strencth
0 2 " 1 h 8 1.0
C . I-" , I "I' 1-;--;--
, I -- I' -', - I
: " _-Lor ',- LL:~I~J-!
I - I 1- .- . ~ -" . : I I I" II
.2 ,,- - I 1 --
I -'.. , ' I '
i~~~=- ---~¡~~-' ~~~.
!-,"i-!--I~, ii-;""'!
.4¡:-" 1-- I'-~¡-:- I'"'~:"
, - , , ,I .' ' I", I'
r-- 1--"'/---1--'
I : I --' - It AlII, :"
". . - 1--' " ,I 1 ' I
.C¡ - I -- I ' '
- ,- _I - -I. \' / \ 'I '.oj " 1'1, I
;--:-;.;:~~~ /~~ . - I I :-:--+-,~-
"I ---,-'- /¡ 1,.._1,,1.1'"1' I
'°L-- ' /, I I ' .'
I ,-: '7--1~;' I.. ~I . I"-~'I"'I
. ' ;'-~. ,~'b~...L~r :": I
i
-l
~
! I
t f
1 ì
il
t t
~
} 'tiD i-lT. I
'I'..rèaà.
B
s
¡)rJION
CASING AND 'rum!;.:; reSIGN
0,,-
. HYD GR. :ï:
o. S
D:.':'E 2 -;L L - 8 0
STA'I?
1>:-L-:) T,,'1'. II
711(1,. HYD. GR. II
m:SIG:I BY Y
~
1':;I/f-:. :.!'S.?
~5':'-
"iTC¡il' f.r...~;3:;:O;{
W/ ž?--- -top o~
Tl/O --, k
, £:J.'-- sc.c...lon
lbs lbs
~ ~ ¡.;!:,r S.f
S':'fE'(CT:--i
TZ:;,sIo:-r
10~0 lòs
TDF Cc.:':'Lo.FSE COLU.PS:; CDF BUP.5T Ii,7'::1.:AL BJ? P?ICZ
PK:SS. ([) PESIS'i'. P?-ESStJ:\.£ 2~'.:::! ù":i ?=:~
botto:n tC:'1~lOn. ì ::::'D ?::.
"OSl P51 'Psi f:::l
c¡ i~óO - 91ÇOC>. )J¿] 2 > 3
ó7ooo
.73
921
8700°.
----.- - --
E'om,Üc.c .
Collapse res1stancc in tc:'1sion. =
X (Collapse pressure ratlr~)
Burst Pressure =
KSP + fup1:h ( Hyd. Gr. II - .5)
BF (Bouyancy r~~tor) =
1.00 - (0.0153 X l~ì.ld Ut. r)
::!r-
~
1
~
'",
,4;
~
'Ì
Ii
~
: 'i
~.
if
, -/:
t ~'
, ;,.
~:.
( ;
. "
, ..,
!;~)
r '.,,¥-
;I~
'T -\.
. \.:;
"'\
¡
.
$?)n
8000
s¿o
~S'ID
C£..lculatlons:
/, °'1
1,0 b
~
~
I
~
t
t
¡,
~
~;
~...
~
:.:
~
~
~
.::Do
iOðO
/530
112'2.. 0
C::: :=
3--
~,
..
n
'.:'o-:..e.: Ccs-:.
~
T-
t
~
f
~
::
.
r
-.' ~
~
}
..
..
(
('
\
~
November 6, 1979
Re: Trail Ridge Well No - 1
Onion oil Company of California
Permit No. 79-72
Sur. Loc_- 1069.58'8 , 329.03'W of HE cr, See 9, T20N,
Rl0W, SM.
Bottomhole Loc.: 820'N & 3400'1 of SW or, See 3, T20N,
RIOW, SM.
Mr. Robert. 1'. Anderson
Q1øtx!ct taod _.Dager
Union Oil Company of California
P. O. Box 6247
Anchorage, Alaska 99502
Dear Mr. Anderson:
Bnclosed is the approved applica,tion for permit. 'to drill the
above referenced well.
Well samples, core chips and a mud 109 are required. A direc-
tional survey 18 required. If available, a tape containing the
digitized log information on all logs shall be submitted for
copying except. experimental 1°98, velocity surveys and dipmeter
surveys.
Many rivers 1n Alaska and their drainage systems have been
cla..if1ed .a t8por~an~ for the spawning or migration of
anadromous fish. Operations in these areas are aub~ect to AS
16.50.870 and the regulations promu19a~ed ~h.reunder (Title 5,
Alaska Administrative Code). Prior to commencing operations
you may be contacted by the Habitat Coordinator'. office,
Department of Fish and Game.
Pollution of any waters of the State 1s prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaaka Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, a8 amended. Prior to
- - - - - - _.- - -- - - - -- - - - -- -- - - - - - - - - - ---
(
r
Mr. Robert. T. Ander.on
Trail Ridge Well Ho. 1
-2-
November 6, 1979
comaenc1ng operations you ..y be cont.c~ed by a representative
of the Department of Inv1rona.D~.1 Conservation.
Pur8uant. 'to AS 38."0, Local Hire Under State Leases, the Al..ka
Departaent of Labor i. being notified of 'the i88uance of thia
permit. t.o drill.
'to a14 U8 in 8Che4u11ng field work, we would appreciate your
not1fyin9 this office within 48 hour. after the well i.
apudded. we would 8180 like to be not,ified 80 that. a repre-
..Dta~l.. of ~b. commi..10ft ..y be pr...nt to w1~n... t..ting
of blowout preventer equipment before surface easing shoe 1s
dr111ed.
In the event of suspens1on or abandonment, pIe... give this
offioe adequate advance notification 80 that we ..y have a
witne.. pre.eat.
Very ~uly yours,
-:ß~#~
f';;(.~ ..11 tcm
Chairman of JiY: ,ORDER Of THE co~,,:r_1H:~S::-"~
Alaska Oil & Gas Conservation Commission
8I\0108"re c
eCt Department of 'ish, Game, Habitat Section vIa enel..
Dep&r~.nt of BDvlronmental Conservation vIol encl.
Departm.n~ of Labor ,SUþervisor, Labor Law Compliance
Division w/o encl.
HU,be
-'-"--,-",-,---,,
.- - - ---- -' ----'-, - -- - - '--- - - - -, - - - .- - -.
(
pe( .i t to Drill
Page 2
PLAN OF PROCEDURE:
1.
2.
3.
4.
5.
6.
7 .
8.
9.
10.
11.
12.
13.
Move in and rig up Brinkerhoff Drilling Rig.
Drive 20" casing to refusal @ + 100'.
Drill17~" directional hole to + 4000'.
Run electric logs.
Run and cement 13 3/8" casing @ + 4000'. Install & test 13 5/8n 5M BOPE.
Drill12~" directional hole to +-15,500'.
Run electric logs.
Run and cement 9 5/8" casing @ + 15,500'.
Drill 8~" directional hole to + 18,000'.
Run electric logs.
Run and cement 7" liner @ + 18,000'.
Test and evaluate upper, middle, and lower tertiary zones.
Complete or abandon well as justified by logs and testing.
DRILLING AND EVALUATION TIME:
1l0-Days
un.en
Union 011 and Gas q, "'Ion Western Reg,ol
' I COMM
Union 011 Company o,"Cahfornla Ii COMM-
POBox 6247, Anchorage, Alaska 99502 ,-' CO'\^,M
, - ----
Telephone (907) 276-7600 '-- t:(:,- ë' JG
Telex 90-25188 t i ¡;-' --:
¡--- J 'ì ,- " -
J '-';
,-- ,
t
¡---- I ,~' ~
I-
I ! j - -,:;L --
'~¡- --
: /')(:'(-\1
1- ~ - J-
: ¡:: r; -(ìj --
I-I CT"T ~-:r"'
~-,,,-
I qlT-r-C J
-I-~-'--' --I
CO N F ER-----'"
FILF: -
October 29, 1979
'" - - ..
(
Robert T. Anderson
District Land Manager
Mr. Hoyle Hamilton, Commissioner
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Alaska 99504
Attention:
Mr. John Leverson
SUSITNA BASIN
State of Alaska
Proposed Trail Ridge Unit
Trail Ridge #1 Drilling
Permit Application
Gentlemen:
Pursuant to 11 AAC 22.050 of the Conservation Regulations, we enclose
herewith nonobjection of Pacific Lighting Gas Development Company to the
subject deviated well, as the affected party.
Please be advised that Union, as Operator, has applied for the designation
and approval of the Trail Ridge Unit. It is our intent to designate the
subject well as the Trail Ridge Unit #1 upon final approval of the Unit.
Very truly yours,
~ges
V~=a~O(
cc:
Tom Cook, Director
Division of Minerals & Energy Management
RECfl VtD
OCT::; 0 19l1J
Alaska Ou & G " ~
.:> I
Anchura~~" ~"'I "',I.~ :/(/11
~
..
.-
(
Union a,l and Gas D(~lon. Western Region
Union 011 Company 0: Jahfornia
POBox 6247, Anchorage, Alaska 99502
Telephone. (907) 276-7600
Telex" 90-25188
un-en
Robert T. Anderson
District land Manager
'October 16, 1979
Pacific Lighting Gas Development
Company
720 East Eighth Street
Los Angeles, California 90017
Attention:
Mr. Jim Guild
PROPOSED TRAIL RIDGE UNIT
State of Alaska
Trail Ridge"Unit Hi
Drilling Permit, ADL's
56870,67324 and 73251
Gentlemen:
Union Oil Company of California has filed application to the State of
Alaska for a drilling permit in anticipation of the proposed Trail Ridge
Unit #1 well.
The proposed surface location is situated on Union's lease ADL 56870
St1""'VC'.~{" ~ ...vv9.58~ Sand 329.03' W of t:he NE corner of Section ~,
l¿U~, RIOW, S.M. The target bottom hole location lies in ADL 56~70,
820' Nand 3400' E of the Southwest corner of Section 3, T20N, RI0W,
S.M.
Pursuant to 11 AAC 22.050, the Alaska Oil and Gas Commission requires
all affected parties involved in a deviation well operation to voice
their non-objection. By definition PLGD is an affected party since it
is an owner in a quarter section directly or diagonally offsetting any
quarter section upon which the operation is proposed to be conducted.
The subject operation affects PLGD's 50% mvnership in ADL's 67324 and
73251.
R r- r E" , \' If ~ f"'\
..' r~ ~ ¡ in., L,;
~- L ~ þ,
.' ,'> 0 \9~a
OCT J ' ; It 1:9
¡ \ uUIIII,\I';( \(,0
Alaska on & ~~o;~~;
.
(
(
Pacific Lighting Gas DeveloPQent Company
October 16, 1979
Page two
Therefore, if the surface and bottom hole locations meet with your
approval, your execution below shall constitute evidence of your non-
objection. Please return all copies to Union so that we may rapidly
distribute same to the proper State agencies.
Very truly yours,
&u~¡/
Corcora~
ACCEPTED AND AGREED TO THIS
~~~ . DAY OF ~ ,
1979.
PACIFIC LIGHTING GAS DEVELOPMENT COMPANY
BQyA~4 ø.~
-
&
Vice President
D tr- ".. F- , '\
'",:' ',"'" t-- ~ I I . f"
J~ ,'~ I:. t d r." ~
~ r ~ },'
orr l;: 0 f';1ìO,'"
v .J ,:" f ,.,
Alaska OIl t\
.')
Afa:~t¡\.Jrì:;Y6
~-'
..
.
-
.~
:
TRACT
NO. DESCRI?TIO~
., . ... ',~ ,. .,
ACRES
1
T20N, R9W.~ S.Hw
Section 15: All'
Section 16: All
Section 17: ~tQ.l
~ection 23: All
2560.00
2
640.00
T20N, RlmJ, S 1M.
.
Section 23: All
3
120N, R8H, S .N.
- ... --
Section 7: All
Section 17: All
Section 13: All
Section 19: All
2445.00
4
T.20N, R9WA, S .H.
Eection 1: All
Section 12: All
Section 13: All
2560.00
T2IN, R9W, S.M.
Section 36: All
t'"
..J
2560.00
120N, R9H, S .~r.
Section 2: All
Section 11: All
S~ction 24: All
T2 H!, R9~'¡ ~ S .~I.
. --
Section 35: A:l
, ,-
.;.'.... -'-""
TRAIL RIDG2 ù~IT
LEASE SCHEDULE
8/1/79
SERIAL NO. &
EXPIRATION
DATE
ADL-49741
2/28/80
ADL-51583
7/31/80
604514
ADL-51607
7/31/80
604457
ADL-51608
7/31/80
604458
ÄDL-51615
7/31/80
604459
ROYALTY &
PERCENTAGE
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
..,'
, .",,- ......., 2:,;.;..rÎi(~s.!";:?}~~":'4--.. "...í.....;..;:.~~~_.¡. ""';~'-"" -
OVERRIDING ROYALTY
INlEREST & OWNERSHIP
- " .
None
Randall L. Aloe
3.00% of 100~OO%
Doyle E. Cochran
2.50% of 100.00%
L. C. Lovely, Jr.
2.50% of 100.00%
Frank Sharps, M.D.
2.50% of 100.00%
L. C. Lovely, Jr.
2.50% of 100.00%
L. C. Lovely, Jr.
2~50% of 100.00%
Doris E: ~Jalko-.Yski
1.25% of 100.00%
A. S. Walkowski
1.25% of 100.00%
WORKING INTEREST OwNERS
~l PERCENTAGE
Anne Windfohr Phillips
S. R. Clark - 50~OO%
50.00%
}
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Cas Dev.
Co. - 50.00%
~/
Union Oil Co. of Calif. - 50.0G%
Pacific lighting Gas Dev.
Co. - 50.00%
\
\' ,
i '( \~-C~
{ ; (.~\ ~ v
\...' ~
\ "
II. \)~s ~
~~'Ø 0\\ Q- ~c~I)~'è-~"
-;
" . .
.,'
~
TRACT
NO. DESCRIPTION
ACRES
SERIAL NO. &
EXPIR..t\TION .
DATE
ROYALTY &
PERCENTAGE
OVERRIDING ROYALTY
INTEREST & OWNERSHIP
. .
WORKING INTEREST OWNERS
& PERCENTAGE
6 T19N, RaW, S.M. 2560.00 ADL-51624 State of Alaska Jack H. White Union Oil Co. of Calif. - 50.00%
Section 5: All 7/31/80 12.50% of 100.00% 2.50% of 100.00% Pacific Lighting Gas Dev.
604460 L. C. Lovely, Jr. Co. - 50.00%
T20N, RaW, S .M.- 2.50% of 100.00%
Section 20: All..
Section 29: All
Section 32: All
7 T20N, R8í'¡, S.M. 2517.00 ADL-51645 State of Alaska Marvin Lundy Union Oil Co. of Calif. - 50.00 )
Section 5: All 7/31/80 12.50% of 100.00% 3.00% of 100.00% Pacific Lighting Gas Dev.
Section 6: All 604461 L. C. Lovely, Jr. Co. - 50.00%
,
Section 8: All 2.00% of 100.00%
T21N, R8í'¡,..S.M.
Section 31: All
8 T19N, RaW, S.M. 2560.00 ADL-51652 State of Alaska A. L. Porter Union Oil Co. of Calif. - 50.00%
Section 4: All 7/31/80 12.50% of 100.00% 2.50% of .100.00% Pacific Lighting Gas Dev.
Section 9: All 604463 ' L. C. Lovely, Jr.. Co. - 50.00%
2.50% of 100.00%
T20N, R8"¡, S.M.
Section 28: All
Section 33: All
9 T19N, R8\'¡, S.M. 2467.00 ADL-51669 State of Alaska L. C. Lovely, Jr. Union Oil Co. of Calif. - 50.00"" )
Section 6: All. 7/31/80 12.50% of 100.00% 2.50% of 100.00% Pacific Lighting Gas Dev.
Section 7: All 604464 A. S. Walkowski Co. - 50.00%
Section 8: All 1.25Z of 100.00%
Doris E. Walkowski
.!20N, RaW, .5. M. 1.25% of 100.00%
Section 31: All
I
. .
.;
~ SERIAL NO. &
TRACT EXPIRATION ROYALTY & OVERRIDING ROYALTY WORKING INTEREST OWNERS
NO. DESCRIPTION ACRES DATE PERCENTAGE INTEREST & OWNERSHIP & PERCENTAGE
"
10 T19N, R8W, S ..M. 2560.00 ADL-51670 State of Alaska Donald L. Stroble Union Oil Co. of Calif. - 50.00%
Section 16: All 7/31/80 12.50% of 100.00% 2.50% of 100.00% Pacific Lighting Gas Dev.
Section 17: All 604465 L. C. Lovely, Jr. Co. - 50.00%
Section 20: All 2.50% of 100.00%
Section 21: All
. '
11 T20N, R8W, S.M. 1245.00 ADL-51671 State of Alaska M. R. Marston Union Oil Co. of Calif. - 50.00%
Section 30: All 7/31/80 12.50% of 100.00% 2.50% of 100.00% Pacific Lighting Gas Dev.
604466 L. C. Lovely, Jr. Co. - 50.00%
T20N, R9W, S.M. 2.50% of 100.00% )
Section 25: All
12 T19N, R9W, S.M. 1280.00 ADL-51694 State of Alaska Estate of Ray W. Union Oil Co. of Calif. - 50.00%
Section 1: All 7/31/80 12.50% of 100.00% Brizzolari (Deceased) Pacific Lighting Gas Dev.
Section 12: All 604467 1.667% of 100.00% Co. - 50.00%
L. C. Lovely, Jr.
1.667% of 100.00%
13 T20N, R9W, S.M. 1280.00 ADL-54006 State of Alaska Hans Lasker Union Oil Co. of Calif. - 50.00%
Section 21: All 6/30/81 12.50% of 100.00% 2.50% of 100.00% Pacific Lighting Gas Dev.
Section 22: All 604468 Rene Francis Co. - 50.00%
2.50% of 100.00%
.
14 T20N, R9~'¡, S.M. 2560.00 ADL-54951 State of Alaska John H. Connelly Union Oil Co. of Calif. - 50.00%
Section 27: All' 8/31/81 12.50% of 100.00% 1.00% of 100.00% Pacific Lighting Gas Dev.
Section 28: All 604472 William H. Rager Co. - 50.00% )
Section 33: All 2.00% of 100.00%
Section 34: All L. C. Lovely, Jr.
2.00% of 100.00%
15 T20N, R9W, S.M. 640.00 ADL-55590 State of Alaska Joseph Lipousky Union Oil Co. of Calif. - 50.00
Section 26: All 11/30/81 12.50% of 100.00% 2.50% of 100.00% Pacific Lighting Gas Dev.
604473 Carl Krempa1ky Co. - 50.00%
2.50% of 100.00%
.'
. .
.
'I SERIAL NO. &
TR.i\CT EXPIRATION ROYALTY & OVERRIDING ROYALTY 1flORKING INTEREST O'W'NERS
NO. DESCRIPTION ACRES DATE PERCENTAGE INTEREST & OWNERSHIP & PERCENTAGE
16 ~20N, R9W, S.M. 1280.00 ADL-56144 State of Alaska Robert D. Niniger Union Oil Co. of Calif. - 50.00%
Section 3: All 2/28/82 12.50% of 100.00% 5.00% of 100.00% Pacific Lighting Gas Dev.
Section 10: All 604474 Co. - 50.00%
17 .T2lN, R9W, S.M. 635.00 ADL-56145 State of Alaska Estate of Joseph F. Union Oil Co. of Calif. - 50.00%
Section 19: All '. 1/31/82 12.50% of 100.00% Jannesse (Deceased) Pacific Lighting Gas Dev.
604475 5.00% of 100.00% Co. - 50.00%
18 T2lN, R10W, S.M. 1280.00 ADL-56864 State of Alaska None *Union Oil Co. of Calif.-IOO.OO%
Section 16: All 4/30/82 12.50% of 100.00% )
Section 17: All 603220
19 T21N, RIOW, S.M. 640.00 ADL-56865 State of Alaska None *Union Oil Co. of Calif.-IOO.OO%
Section 15: All 4/30/82 12.50% of 100.00%
603221
20 T2IN, R10W, S.M. 2560.00 ADL-56866 State of Alaska None *Union Oil Co. of Calif.-100.00%
Section 20: All 4/30/82 12.50% of 100.00%
Section 21: All 603222
Section 28: All
Section 29: All
21 T21N, RlOW, S.M. 1280.00 ADL-56867 State of Alaska None *Union Oil Co. of Calif.-lOO.OO%
Section 22: All 4/30/82 12.50% of 100.00%
Section 23: All 603223
22 T2IN, Rlm.¡, S.M. 2560.00 ADL-56868 State of Alaska None *Union Oil Co. of calif.-IOO.OOk )
Section 27: All 4/30/82 12.50% of 100.00%
Section 32: All 603224
Section 33: All
Section 34: All
23 T20N, Rlm.¡, S.M. 2560.00. ADL-56869 State of Alaska None *Union Oil Co. of Calif.-100.00%
Section 5: All 4/30/82 12.50% of 100.00%
Section 8: All 603212
Section 17: All
Section 20: All
> . .
~
SERIAL NO. &
EXPIRA.TION
DATE
TRACT
NO. DESCRIPTION
ACRES
ROYALTY &
PERCENTAGE
OVERRIDING ROYALTY-
INTEREST & OHNERSHIP
WORKING INTEREST OvlNERS
& PERCENTAGE
24 T20N, RIOW, S.M. 2560.00 ADL-56870 State of Alaska None *Union Oil Co. of Calif.-100.00%
Section 3: All 4/30/82 12.50% of 100.00%
Section 4: All 603213
Section 9: All
Section 10: All
25 T20N, Rlm.¡, S.M. 2560.00 ADL-56871 State of Alaska None *Union Oil Co. of Calif.-100.00%
Se~tion 15: All 4/30/82 12.50% of 100.00%
Section 16: All 603214 )
Section 21: All
Section 22: All
26 T20N, RIOW, 1920.00 ADL-56872 I
S.M. State of Alaska None *Union Oil Co. of Calif.-100.00%
Section 27: All 4/30/82 12.50% of 100.00%
Section 28: All 603215
Section 29: All
27 T19N, RI0W, S.M. 1920.00 ADL-56873 State of Alaska None *Union Oil Co. of Calif.-lOO.OO%
Section 3: All 4/30/82 12.50% of 100.00%
603216
T20N, RI0W, S.M.
Section 33: All
Section 34: All
28 T20N, R9W, S..M. 2488.00 ADL-56874 State of Alaska None *Union Oil Co. of Calif.-100.00%
Section 19: All 4/30/82 12.50% of 100.00% >
Section 30: All 603217
T20N, Rlm.¡, S.M.
Section 24: All
Section 25: All
.
" .
TRACT
NO. DESCRIPTION
ACRES
SERIAL NO. &
EXPIRATION'
DATE
ROYALTY &
PERCENTAGE
OVERRIDING ROYALTY
INTEREST & OWNERSHIP
,
WORKING INTEREST O~~ERS
& PERCENTAGE
29 T19N, R9W, S.M. 2495.00 ADL-56875 State of Alaska None *Union Oil Co. of Calif.-l00.00%
,
Section 6: All 4/30/82 12.50% of 100.00%
603218
T19N, R10W, S .l1. '
.
Section 1: All
T20;N, R9W, S.M. )
Section 31: All
T20N, R10yJ, S.M.
Section 36: All
30 T19N, R9W, S.M. 2560.00 ADL-56876 State of Alaska None *Union Oil Co. of Calif.-100.00%
Section 5: All 4/30/82 12.50% of 100.00%
603219
T20N, R9W_, S.M.
Section 20: All
Section 29: All
Section 32: All
31 T19N, R9W, S.M. 2560.00 ADL-56878 State of Alaska None *Union Oil Co. of Calif.-l00.00%
Section 3: All 4/30/82 12.50% of 100.00%
Section 4: All 603204
Section 10: All )
Section 15: All
32 T 19N, R9}1_,- S. M. 1280.00 ADL-56880 State of Alaska None *Union Oil Co. of Calif.-100.00%
Section 26: All 4/30/82 12.50% of 100.00%
Section 35: All 602677
..
" .
, '
'.
TRACT
NO. DESCRIPTION
ACRES
SERIAL NO. &
EXPIRATION
DATE
ROYALTY &
PERCENTAGE
OVERRIDING ROYALTY
INTEREST & O~~ERSHIP
WORKING INTEREST OWNERS
& PERCENTAGE
33 T18N, R8W, S.M. 2517.00 ADL-56881 State of Alaska None *Union Oil Co. of Ca1if.-100.00%
Section 6: All 4/30/82 12.50% of 100.00%
602695
T19N, R8"", ,S.M. ,
Section 31: All'
_T 19N, R 9W, S- . M.
Section 25: All .>
Section 36: All
34 T18N, R9tv,- S.M. 640.00 ADL-56882 State of Alaska None *Union Oil Co. of Ca1if.-100.00%
Section 1: All 4/30/82 12.50% of 100.00%
602696
35 T18N,- R9W, S.M. 640.00 ADL-56884 State of Alaska None *Union Oil Co. of Ca1if.-100.00%
Section 12: All 4/30/82 12.50% of 100.00%
602697
36 T18N, R8W, S.M. 2524.00 ADL-56885 State of Alaska None *Union Oil Co. of Ca1if.-100.00%
Section 7: All 4/30/82 12.50% of 100.00%
Section 8: All 602698
Section 17: All
Section 18: All
37 TI8N, R8W, S.M. 640.00 ADL-56886 State of Alaska None *Union Oil Co. of Calif.-100.00" )
Section 5: All 4/30/82 12.50% of 100.00%
602699
38 T18N, _R8W, S.M. 640.00 ADL-56888 State of Alaska None *Union Oil Co. of Ca1if.-lOO.00%
Section 9: All 4/30/82 12.50% of 100.00%
603201
.'
, .
TRACT
NO. DESCRIPTION
39
40
41
42
43
44
ACRES
J18N, RSW, S .Ff.
Section 15: All
Section 16: All
Section 21: All
Section 22: All
2560.00
T 19N, R9\'¡, _S. M.
Section 23: N1/2 NEI/4
80.00
T21N, RI0W, S.M.
Section 24: w1l2 SE1/4
Section 26: SE1/4 SE1/4
S~ction 35: Sl/2 SW1/4
200.00
T19N, R8W, S.M.
Section IS: All
Section 19: All
1226.00
T19N, RSW, S.M.
Section 28: All
640.00
TI9N, R9W, S.M.
Section 13: All.
640.00
SERIAL NO. &
EXPIRATION
DATE
ADL-56889
4/30/82
603202
ADL'-57577
8/31/82
604499
ADL-57580
8/31/82
604948
ADL-57951
9/30/82
604498
ADL-57952
9/30/82
604477
ADL-57953
9/30/82
604516
ROYALTY &
PERCENTAGE
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
./
OVERRIDING ROYALTY
INTEREST & O~~ERSHI~
None
Bennie Leonard
1.50% of 100.00%
Virginia Cerveny
1.50% of 100.00%
None
Bennie Leonard
1.50% of 100.00%
Virginia Qerveny
1.50% of 100.00%
Estate of Caryl J.
Martin (Deceased)
5.00% of 100.00%
Donald R. Pearson
.375% of 100.00%
Wayne Hamers1y
.375% of 100.00%
R. J. Coury
.5625% of 100.00%
Michael R. Meinke
.5625% of 100.00%
John F. Flack
.5625% of 100.00%
A. R. Hansen
.5625% of 100.00%
WORKING INTEREST O~~ERS
& PERCENTAGE
*Union Oil Co. of Calif.-100.00%
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
-)
**John Kubanyi - 100.00%
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
)
. .
. ,
TRACT
NO.
SERIAL NO. &
EXPIRATIO~
DATE
ROYALTY &
PERCENTAGE
OVERRIDING ROYALTY
INTEREST & OWNERSHIP
DESCRIPTION
ACRES
45 T20N, R9W, S..M. 640.00 ADL-57954 State of Alaska Donald R. Pearson
Section 14: All 9/30/82 12.50% of 100.00% .375% of 100.00%
604521 Wayne M. Hamers1y
.375% of 100.00%
, E. Wm. Knuth
.
.5625% of 100.00%
Harold E. Spoelstrad
.5625% of 100.00%
Jeanne E. Grohs
.5625% of 100.00%
Dean Doe1
.5625% of 100.00%
46 T20N, Rl_OW., S.M. 1280.00 ADL-57955 State of Alaska Clifford C. Burglin
Section 13: All 9/30/82 12.50% of 100.00% 1.50% of 100.00%
Section 14: All 604519 Laurence Irving
1.50% of 100.00%
J. D. Johnson
.6% of 100.00%
47 T20N, RIOW, S.M. 160.00 ADL-58139 State of Alaska James W. Y. Wong
Section 26: SW1/4 10/31/82 12.50% of 100.00% 1.50% of 100.00%
603272 Gerald Ganopole
1.50% of 100.00%
48 T18N, R8W, S.M. 640.00 ADL-58571 State of Alaska J. M. Souby III
Section 4: All 11/30/82- 12.50% of 100.00% 5.00% of 100.00%
604478 W. E. Shoemaker
5.00% of 100.00%
L. C. Lovely, Jr.
4.00% of 100.00%
¡
WORKING INTEREST OWNERS
& PERCENTAGE
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
)
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
*Union Oil Co. of Calif.-100.00%
Unio Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. - 50.00%
)
.. -.
TRACT
NO. DESCRIPTION
- .
ACRES
SERIAL NO. &
EXPIRATION
DATE
ROYALTY &.
PERCENTAGE
OVERRIDING ROYALTY
INTEREST & OWNERSHIP
WORKING INTEREST O~rnERS
& PERCENTAGE
49 T19N, RaW, S.M. 2536.00 ADL-58572 State of Alaska Catherine E. Chapman Union Oil Co. of Calif. - 50.00%
Section 29: All 11/30/82 12.50% of 100.00% 1.50% of 100.00% Pacific Lighting Gas Dev.
Section 30: All 604588 (Administrator of Co. - 50.00%
Section 32: All Everett L. Chapman
Section 33: All , Estate, deceased)
.
K. W. Bumgarner
1.00% of 100.00%
Bruce Bumgarner )
5.00% of 100.00%
50 T20N, R9W,. S .J1. 282.00 ADL-62916 State of Alaska Harris N. Marcus Union Oil Co. of Calif. - 100.00%
Section 18: W1/2 2/28/80 12.50% of 100.00% 3.00% of 100.00%
604515
51 T19N, R9W, S_.M. 320.00 ADL-62918 State of Alaska J. J. Teskey Union Oil Co. of Calif. - 50.00%
Section 11: N1/2 2/28/80 12.50% of 100.00% 3.00% of 100.00% Pacific Lighting Gas Dev.
604517 Co. - 50.00%
52 T19N, R9W, S.M. 640.00 ADL-63836 State of Alaska Clifford é. Burglin Union Oil Co. of Calif. - 50.00%
Section 24: All 5/31/81 12.50% of 100.00% 2.4% of 100.00% Pacific Lighting Gas Dev.
604520 Mary Sue Fenner Co. - 50.00%
.6% of 100.00%
53 T19N, R10W, S.M. . 640.00 ADL-65083 State of Alaska None **Alaska International Petroleum
Section 2: All 11/30/79 12.50% of 100.00 Corp. - 100.00% )
604930
54 T20N, R8W, S.M. 2560.00 ADL-66711 State of Alaska None M. M. Anderson - 100.00%
Section 3: All 1/31/80 12.50% of 100.00%
Section 4: All
Section 9: All
Section 10: All
55 T20N, R9t.¡, S.M. 640.00 ADL-66715 State of Alaska G. R. Bing Union Oil Co. of Calif. - 50.00%
Section 36: All 1/31/80 12.50% of 100.00% 5.00% of 100.00% Pacific Lighting Gas Dev.
604479 Co. - 50.00%
.þ'
... .
It
TRACT
NO. DESCRIPTIO~
ACRES
SERIAL NO. &.
EXPIRATION'
DATE
ROYALTY &.
PERCENTAGE
OVERRIDING ROYALTY
INTEREST & OWNERSHIP
WO~~ING INTEREST O~~ERS
&. PERCENTAGE
56 J21N, R19W, S.M. 1320.00 ADL-66958 State of Alaska None Herschel H. Jaffe - 100.00%
Section 24: W'l /2 2/28/80 12.50% of 100.00%
Section 26: N1/2, SW1/4, Nl/2,
SEl/4, SW1/4 SE1/4
Section 35: N1/~j N1/2 SW1/4
57 T20N, R10W, S.M. 640.00 ADL-67234 State of Alaska Carl A. Schellinger Union Oil Co. of Calif. - 50.00%
Section 2: All 4/30/80 12.50% of 100.00% 3.00% of 100.00% Pacific Lighting Gas Dev. )
604513 Co. - 50.00%
58 T19N, R9\'¡, S.M. 640.00 ADL-67640 State of Alaska William Nuttall Union Oil Co. of Calif. - 50.00%
Section 2: All 6/30/80 12.50% of 100.00% 4.00% of 100.00% Pacific Lighting Gas Dev.
604580 Co. - 50.00%
59 T19N, R9W, S.J1. 960.00 ADL-67991 State of Alaska Gerald C. Vittetoe Beard Oil Company - 100.00%
Section 11: Sl/2 7/31/80 12.50% of 100.00% 3.00% of 100.00%
Section 14: All
60 T20N, R10W, S.M. 640.00 ADL-68250 State of Alaska None Rita Short - 100.00%
Section 35: All 9/30/80 12.50% of 100.00%
61 T20N, R9W, S.M. 2560.00 ADL-72094 State of Alaska Paulette Williamson Union Oil Co. of Calif. - 100.00%
Section 4: All 7/31/83 12.50% of 100.00% 2.00% of 100.00%
Section 5: All 604581
Section 8: All .
)
Section 9: All . >
62 T20N, R9W, S. }!. 1198.00 ADL-72095 State of Alaska ' Pauline Spaudling - 100.00%
None
Section 6: All 7/31/83 12.50% of 100.00%
Section 7: All
63 T20N, RIO\'¡, S .H. 1280.00 ADL-72096 State of Alaska None Martin Yates, III - 100.00%
Sect ion 1: All 7/31/83 12.50% of 100.00%
Section 12: All
!
.
'.
. ...
. .
TRACT
NO. DESCRIPTIO~
64
T20N, RI9~,- S_.M.-
Section 11: All
65
T21N, RI0yJ, 8.M.
Section 25: All. >
Section 36: All
SUBTOTAL STATE ACRES LEASED
- - - --- -----
66
T21N, RIOW, S.M.
Section 24: NEl/4t E1/2 SE1/4
67
T21N, RIOW_, S.M.
Section 35: SE1/4
68
T21N, R91\T, S.M.-
Section 30: All
Section 31: All
69
T21N, R9W, S.M.
Section 32: All.
Section 33: All
Section 34: All
70
T21N, R8W, S.M.
Section 32: All
Section 33: All
Section 34: All
71
T20~, R9H., 8.M.
Section 18: El/2
ACRES
640.00
1280.00
240.00
160.00
1274.00
1920.00
1920.00
320.00 '
SERIAL NO. &
EÀ"P IR.r\TION
DATE
ADL-73251
7/31/83
604582
ADL-74254
9/30/83
98,015.00
,
ROYALTY &
PERCENTAGE
State of Alaska
12.50% of 100.00%
State of Alaska
12.50% of 100.00%
State of Alaska
State of Alaska
State of Alaska
State of Alaska
State of Alaska
State of Alaska
..,.'
OVERRIDING ROYALTY
I
INTEREST & O~~ERSHIP
-, . - -
Alver C. Duncan
2.00% of 100.00%
None
,
WO~,ING INTEREST OWNERS
& PERCENTAGE
Union Oil Co. of Calif. - 50.00%
Pacific Lighting Gas Dev.
Co. '- 50.00%
Paulette Williamson - 100.00%
"-
/
Unleased.
Unleased.
Unleased.
Unleased.
,
,
Unleased.
Unleased.
. -;.
~ '" .
..
. . -
TRACT
NO. DESCRIPTION
72
T20N, R8W, S.M.
Section 15:' All
Section 16: All
Section 21: All
...
73
T20N, Rlm.J, S.M.
Section 26: N1/2t SE1/4
74
T20N, R9W, S.M.
Section 35: All
75
T19N, R9W, S.M.
Section 23: W1/2, SE1/4, Sl/2
NE1/4
SUBTOTAL STATE ACRES UNLEASED
, ------
SUMMARY
TOTAL STATE ACRES LEASED
TOTAL STATE ACRES UNLEASED
TOTAL UNIT ACRES
- - - - -
ACRES
SERIAL NO. &
EXPIRATION'
DATE
ROYALTY &
PERCENTAGE
State of Alaska
State of Alaska
State of Alaska
State of Alaska
OVERRIDING ROYALTY
INTEREST & OWNERSHIP
WORKING INTEREST OWNERS
& PERCENTAGE
Unleased.
Unleased.
Unleased.
""")
/
1920.00
480.00
640.00
560.00
9,434.00
98,015.00
9 ,.434.00
107,449.00
Unleased.
,
*PLGD must drill a well to earn a 50.00% share.in these leases in accordance with the Union!PLGD Joint Venture Agreement dated October 29, 1976.
**Leases subject to Union/PLGD One Year Option Agreements to purchase.
i
<
Union all and Gas r'vison' Western Region
Union all Company vf California
P a Box 6247, Anchorage, Alaska 99502
Telephone (907) 276-7600
un.en
Robert T Anderson
October 8, 1979
District Land Manager
Mr. Hoyle Hamilton
Division of Oil & Gas
State of Alaska
3001 Porcupine Drive
Anchorage, Alaska 99504
SUSITNA BASIN AREA
State of Alaska
Trail Ridge Unit No.1
ADL-56870 (8-86-71-5455-603213)
Dear Mr. Hamilton:
Enclosed for your approval are three (3) copies of the Permit to Drill
or Deepen for the above captioned wildcat well. Also enclosed is our
check, number 18962, in the amount of $100.00 to cover filing fees.
Upon approval, we would appreciate a copy for our files.
Very truly yours,
sk
Enclosures
RECEIVED
(1:'1' 9 1979
AI:ska Oil & G 1S Î.I,rj:J L\..HìmI3~lon
Anéf1oragfj
.
Form 10-401
REV. 1.1.71
(
SUBMIT IN rf .TE
(Other Instr~.. In
reverse SIde)
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
API #50-283-20065
5
PERMIT TO DRILL OR DEEPEN
6 LEASE DESIGNATION AND SERIAL NO
180 TYPE OF WORK
ADL 1156870
DRILL ~
DEEPEN 0
7 IF INDIAN, ALLOITEE OR TRIBE NAME
b TYPE OF WELL
OIL 0 GAS J::J
WELL WELL~XI
2. NAME OF OPERATOR
OTHER
SINGLE 0
ZONE
MULTIPLE_D
ZO NE )BfI
8 UNIT FARM OR LEASE NAME
UNION OIL COMPANY OF CALIFORNIA
9 WELL NO
Trail Ridge Well III
3 ADDRESS OF OPERATOR
P.O.BOX 6247, ANCHORAGE, ALASKA
99502
10 FIELD AND POOL, OR WILDCAT
Wildcat
Sec.9,T20N,RlOW,S.M.11 SEC,T,R.,M,(BOTTOM
~~pWE<&IVj)400' E of the S. W.
Cor,Sec 3, T20N,RlOW,S.M.
12
4 LOCATION OF WELL
M~fuœ 1069.58'S & 329.03'W of the N.E.Cor,
At proposed prod. zone
13 DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFlCE*
9 miles Southeast of Skwentna
14. BOND INFORMATION
TYPE Statewide Surety and/or No. United Pacific Insurance Co. B-55372
15. ~:.fig~\~O:E~~~~SED* 4210'N of South line 16 No OF ACRES IN LEASE
PROPERTY OR LEASE LINE, FT. of Union Lease ADL-56370 2560 00
(Also to nearest ling, urnt, If any) .
18. DISTANCE FROM PROPOSED LOCATION 17 3 miles 19 PROPOSED DEFfH
TO NEAREST WELL DRILLING, COMPLETED, S . th t f
OR APPLIED FOR, FT OU wes 0
Union/Tex.Pet Kaniltna River Unit #1.
21. ELEVATIONS (Show whether DF, RT, CR, etc.)
216.6' Above MSL
Amount $100 ,000. 00
17 NO.ACRES ASSIGNED
TO THIS WELL
160
20 ROTARY OR CABLE TOOLS
l8,500'M.D.
'-
Rotary
22 APPROX DATE WORK WILL START
2/1/80
23. PROPOSED CASING AND CEMENTING PROGRAM
SIZE OF HOLE SIZE OF CASING WEIGHT PER FOOT GRADE SETTING DEFfH Quantity of cement
20" 20" 10111 H-40 Driven to Refusal
l7~" 13 3/8" 6111 & 6811 K-55 + 4000' 3500 sx
l2~" 9 5/8" 4711 ~-80,S95 +15,500 4500 sx.
8~" 7" 29# S-95 +18,000 600 RX..
SEE ATTACHED
,
IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM If proposal IS to deepen give data on present productIve zone and proposed
new productIve zone. If proposal IS to dnll or deepen duectIonally, give pertinent data on subsurface locatIOns and measured and true
vertIcal depths. GIve blowout preventer program.
24. I hereby cert~~~~~g I~~a"md cor/t I'" .. . -
SIG~~~.vf/'.¿:'~~(' DATE October 8, 1979
Rnh~r~ T, ^n~~rnon
(TIns space for State office use) i CONDITIONS OF APPROVAL, IF ANY
SAMPLES AND CORE cmps REQUIRED MUD LOG OTHER REQUIREMENTS
TITLE
Di Rt. T.ann Mgr-
WhS 0 NO
DIRECI'IONAL SURVEY REQUIRED
25l YES
DNO
A.P.I NUMERICAL CODE
i1YES
tiNO
.s,; - 2..iJ - 2.ùi.? 'S
PERMIT NO. '7 f - 72. APPROVAL DATE
APPOVED BY ~Æ #- ~ TITLE Chairman
¿7 v 7' -- *See I nstruction On Reverse Side
BY O~"1J"'" ~"': "I:"..,~"": C-~"'r\'H,",!"'IP,"",!:\1
.~..,"-...I. v.. ~~d.... ,,-"...bHv....._V~'öI
~~r 6 I 1979
11/6/79
DATE
WELL
F~ CR-13
1/12
1~~\~(!..~E. ...,E.l-I-. "
FIELD
CASING AND TUBING DESIGN.
CASING STRING \3 "3fB" COUNTY STATE A L P-c" ~ ç.. DATE '7-10-7'9 DESIGN BY &;çß
CABIBG SIZE \"3 >/8" EOIZ SIZE '(" ~fft I . 5 'Psi/f!.:,. MUD ""T. II II/fl,. HYD. GR. II p::>i/ft. H.S.?
ilL MUD WT. I 72. . HYD GR. 1=-5:'.
Ilfl'~VAL I.EN~w. DESCRIPTION '.-!EIGHT TENSIO~ l-ŒN!MtJM TDF COLLAPSE COLIlü'SE CDF BUP.sT n:TEm-IAL BDF P?ICE CCS~
Bottom Top W/ BF -top o~ STIBNGT".r{ PRESS. @ F.ESIST. PRESSURE 2!Im!:ID-! PE3
Wt. Grade T'r.read W/O :aIi'L section TZI\'"SION bottO!ll tension YIEi.,D ~.
lbs lbs 1000 lbs psi psi psi psi
Ge.co' TV) , I ~
3 coO r 0 3000 101 *- )<-55 ßuTt~SS _18.3)000 ~51, 000 9 (¿ roa 3Þß3 ¡'ioe ~78 ~ ¡'-{oo 3o~o ;¿ 2.1
,
~100'T"")
, bß" I.;~
I 106 COD '
"'l occ 3 OIr-"ID jooo {<-55 B ù"7í I'f: S S (;, 6 COD oCoO¡ 000 1572.. 1850 10)50 1850 34Sô 1 eb
) > ;)
..
'-'"
--
8
~ ....
0 CD
or! Q
:: l!.
f. 0
">'~
"-"
. .
+, ~
.. III
.... ...t
III III
" "
sri ø:;
" "
.. CD
ø. ø.
~~
S 8
'"::;,
í:.;
'f.~'
~'
..,
~.-I
"","
)~
~t
~~
(~1
-~
ri
Õ6
~
Ä
!
~
Y=~ens11e ~oad/Plpe Yield Strength
e,O. . -¡.... -.II~ 'I' ,6, "'I .:8" " 1.0
",--.HI' """"""/-1
',-.':,I,:I"!:':L.llill;' I
I :"-1:7: ..I-:,I,'ïi;~~'-:--
2',.:',.--,,' ':"'1"', ,'..'
., .,.," ""I'I-~
,.,I'H,!_!..",..I...".! 'I'"
...,..j .' ""1"'" "
-=-~~- -~ ....:.-:.....:..- "':"'-;":1
,.., ,---,.._,.".,,;"
"" I.'~" ,:1,.: ;: 'ï1,,~I'~ ,.,:,,!,
.~!:, '~:',' ,':','..' ,"-:",
¡H'" I-:_'~ ',1"1""1" "I"...,
H::"'~ ',i",' '/,',I::,:.L'.
~' I~I '" 1~-i'l~"I--;-I-:7"
, -, - .. . '. . I '" " , "
""f""'" '1':.1'.1'" "I, I
.C' "1"1 ~'/I"", ,.
I":"-\--I.il~/' "'"I':;!..'II,,'
i',.:' -- , :-,'. .~-~' . ",1 " '."'1 ;,'
r:~'.'~.'/1" .~ I:~I""J"'i.' :-:::-1"::
^\'..- 'I""" 101..- '"'" I ""1' "',
.0 "'~-~-' "1""""
... I" '7' I 1,".' -"'L' I 'f"'I' 4j
"'I" ""'1,1"'1.""""""
0:".1. :~",,"':;,.';I¡¡'I:tr':'1!~:'
I
~'
~
~,
~,:
~
,~
~
.
:!!
}f
~
OJ
~
'i
"
J'
<
Fomulae:
Total Cos ~
Calculations:
Collapse resistance in tension =
X (Collapse pressure ratir~)
1"y =
T.L..
'I. s-
<0 8 ODD
-:::~
"'I ~2- ooC
)
:::::
..07
Burst Pressure.
MSP + Dep'th ( Hyd. Gr. II - .5)
" X. :.
.c::.¡Co
'. Co IlAf';E..
;N, TeAJ~:c:r.-:::
EF (Bouyancy Fe.ctor) =
1.00 - (0.0153 X Mud Wt. I)
(!? 3c>C'(.~/,
e:.")c.;.)(15'-1l)) =:
.
I<-¡ '7 ß
~
.
,~¡
1
,~, . ,-
i..
. ,,~,
.~ ;
,I
. ~ >
"
.,
i
"
> ,
'j,
.!
""'
~
1
~(
I
~
~
~~
".
1.
,t
-"""""¡'
" .' )~1:
;}
. '13'
c ,:¿,.,
- ,~~¡'
:~:
>:~i
Or
. '.
: j~
" ,~
'è,-
~- ~ .~~
::~
'r
,'"^ }~
, '.<~(
,<~
.~~
1~
m:u.
F~ CR-13
1/12
. L<:.> tJ E.
SìA{2" S\~ec...
CASING AND TUBING DESIGN
CASING STRING
.....
jRfIo..,,-\t,¡;X;E Lœ\\~' FIELD
05/8 It COUNTY STATE ALAS KA DATE 7- 10-79 DESIGN BY G f: (?
:5 " pc r JI/ I
9 Ve, harz SIZE /2 '/L( MUD WT. I 72 ~. HYD GR. I .5 'Psi/ft. MUD ""T. II 1Lfi:.. HYD. GR. II- p:>i ft. l.f.S.?
r..ASING SIZE
Bottom
INTERVAL
I.EN~'¡'H
DESCRIPTION
'rlEIGHT T?.NSIO¡f lv!IN!MUM TDF COLLAPSE COLLAPSE CDF BUP.ST n;T£mi-U. BD::' P?ICE
wi BZ- -top of: STlBNG'Yrl PRESS. @ F.ESIST. pm;SSURE 1 Ð; ! IT.! :UH p.:;;t
wlo B~ section TZ!~SION bottœn tension YT£1D P':! .
lbs lbs 1000 lbs 1'si psi psi psi
(':1l{oo' Tltl»
' 0' r '-\ '1 #- 3700
6c"úD &-co N-eo ß,...:."n(L£SS 31 fo 000 7;;"5)500 'IOBIo[x;o 1,.l.C)
)
~",Wf)t rye)
Booo ' 7500 ' J.-t7# :5-<"'}5 B<,,"rr~E s s 352. ,500 352.}5C")o I Z-ß'-)) O(jQ 3,<ø\:' 7000
15)500
~
,-
--
Top
Wt.
Graàe
T'tlreaà
r-r"
Gt..fod 'hi) ,
ì:ä.~ I 5 )ceo
GS~ESS
8
~ ~
0 ID
~ ~
:! l!.
t 0
"-""'"
:. >
"'-"
. .
+J .+J
t:I ID
... ~
fI ID
~ ~
t' II
!!
8 8
,
'\
\ ,:'
,
I .
, { "
( 1\\
"
, ,
~. 'Þ.~~,!
,)
;: ( ,
l "
'f ,~:
~'" it,'
"Î
. ,
Cf:'
3co,,'
.7.9. S-~S
Y=~ensi1e ~oad/Pipe Yield Strength
Cp. . "f-". ",Jt~ ", ,6, " 1,0"8,,, 'I 1.0
1,---..., ,', """"/-1
I ,- - ;. I' ,= I " ! :- ~ i ' ': , I
1"'-I:-:T-'._r':'':'I'i'~~,T
. , , -, ", I .' "
.2 " ,-. " I":' ~
I - J. -,' . - I. "I - I ,.
,I.. -'--""""'-IŒ'-'
,',.1, j, '1"1""" "
. " , -, ,"" ., "
~':--~-:-I-::--~'-:-I-;-¡-' 'I "
I ":1 I,': ,,:: ~ ¡: "I.I"~': ',,' :1,
.4! ~ , ',:.:' ,- ,':',' -' .. '-:",',
."" .-- 'I"'" ..1".,.,
¡,..."L",I"",!,'""""
,....., "..., r""""-
r.,' -:- " , l-:-'t-i"/~í71 :7"7:-:-;-
,.1.-".,.. "/."'" ¡"I'"
.é',"';:'lu,,: :'-..!:.'/II':" ",,:..1
I- \'~-I"'I,il~ /., ':'ï,:....q',,'
¡°J-:-:, ":-,,.,/¡~, ",1,,',"',;,'
r~-." "'-'-;-, "J""~-;-
,. , ' , I ' .' I " " ' , I " " 'I ,.,
Sl"'- --,I" ... '.A 11/._- ,..' , .., 'i..,I,..
. \.... ~;':""-t 7(' ~11-=---I': ~, I:: "I': : ','I": I: :: I
"'1' ,. "",1'.'1""""1"
: 'J ,~,"'I¡...';II'I:~r':':!', I
. ':
,l
~
I
.
~
.
.. ,
I.
, ..-
" ':,'
. ,
. ,
':
, ,
"
I"
, I)
(
1
, " '
'. ':~
. '
-
,
J
'>: ,
.(, .~' ¡
~. . '" "
, ,'í'
¡,
" '
. '
,
- .
,
~
l
~ r
I
:!
.. "
, .
, .
, ,'" '
I ~~~,'
I.,} r
~
)'-
3600 1.03 .3700 ~870 I.S&'
11/ DO J,Of 7000 8150 I(G:,
B7oco
)
8 crX)
61 000
803 000
- )
8000
1.\5
0) 23
9'2.00
9(."Ojo
l 2..\
Fomulae:
, Tota.l Cos-;
Calculations:
Collapse resistance in tension =
X (Collapse pressure ratir~)
'* ~-\- '1400' Tvi) ,
y= ~ =
V s,
3 52..) .,,- 0 ~ -
l,o8b)oOD -
.32..
x =
.80
Burst Pressure =
~ ~1SP + DepÙl ( Hyd. Gr. II - .5)
9 ìtoo\ 'lefJS\:'N
C ol\"~\õ.(L
=
(.g9(4ï';1:J\}~~)::: 3e<ü
BF (Bouyancy Fe..ctor) =
1.00 - (0.0153 X Mud Wt. I)
,t:
~, :~ -,'
!
~
~
~
,ar
~
-1 '
W
E
I,
L;
¡ -,
H
,-
¡
"
t
',.
, ,
j.
i
,
"
:
A. ,
? .
, -,
~si.
, CCS::
~Sl..
,~,,-- ,-
c ...".
" ~
'f-t
" 'W'
',.. '<;1,
r ~'
>?t'
;- 'I~
';,.' ~,' .,','
~-'< (,
~,r ~,\\íi
:' }~;.
- ;"i
, . ~\<
, t}
, '/i.
"""""'¥;
, 'l .
;,~'
. ¡ ry¡
¡ :l~-
.---.- ---
---,
¡ L , oJ .
. ,
-p'f)Ç
---r.IlV
'I '
--"""'11')
---
,.. , ,
-.
\
. .
-' .
"
':;'.'I":!JJ
-,' ....J.
..........., 1 çr.r'lL#
.::I 1:::..':'..,//1 ~Y
-'
,
',~.:. .:. ,0
~
~ ¿:".:'
,
~~
~
. -
. I '
, -
,--
~
'--"-"
:' ~:: -
, ,-,
", ,:
. "
- ,
'. -
, .",
'0 0 ::. 0
0... 01. .
0', : '
,
.
'0 .
.
, '
- ----
/r,.,,-,-..,
.,\ / .,: II J ...' "" ..
(0 , ,.1" , /
J,./ ,'I ;'1
1".
J
,
---
...
.'
7
.
.
, ,
0 0
-
,
0, :00
" 0
.0
-
0,
: '
..
.
- "
.. ~ .
~ , " "
0" '.
0
" .
,
. 0 ...
-
!
~
I , .
I 0
.
I
'(~ r
(.
0 .
-,0 . -
, -
,"
- ,
..",'.-0,
" - 0
,"'
0,
C><1J
1?
..'
-:; c.{) """,1
..J..I I I ../
.. .
, '
,"
.
..:1'
.
3XCHJ
.:~!1iSCd
"
, ~
0
,
,
,
" -
.
¡t4
I' - to
-,~
, ',I
~':,
"' S...,,-.LJf
'::/a¡../
00
.
-.
,--,'
.
0
0 0
.-
..
0 0
"
.. 0 :
..
-. ,
" ,
,-
-.
0_-
' -
" l' "1
/1,1 Y
J} "J (' ~ }-<' () -:: r¡ -:; 17 '-f : II -:; . I '/1 if
'"" - ..... . .., - v - v , I / ...II, VI
. ,
. . , "
-, .'
.
, "
EO .
" - '"
'.'. ..
-, .-
" -
. - -,
0- ---
0 .
'-
,
"
0' ~
-
0
o. ,",'. " ..' "-,-::,,,':" ':- ~
,/þ --'-., ",
e, , - ,
-~ 0 " .- . ,0 0
i
~
.
-,' ,', .-- " ,
0 -. 0-. " / ' ,.. - --
--;( s: ç ¡, ~ i?'~~~;6! "
, . ,I , '
"
"",
"
",
, "
- -
f"'~"'lf('
U u .. .J, f , .... .)
----
"",- 'J
J"lv, :
, 0
..
~'
.
liP
, "
'.
..
, '
, ,
, .. ' ,
, ...
.0
'.
"
, '
0 '
, 0
J=~
I /('1 I I ')
y\C. ,~
, "
.
,-
'---""
.
: ,0
..
. 3788fiO
..
. '
.
.
',- '=: ".
-' .' - 0
. "
:>
"'!'
.. '
ð
0
, : ,
"-
, ',..
..
"
, ,- 0'
,
"
-
, " ,
" -
. "
, 00
.. ,
0
, .
, '
'- ,,-
.-
0 .. '.',
, 0 '
I J. "
S' '-'
II ::-
'-,' , ,
# -
.. ,
.-
.
, '
, ' -.
, , - "
- ,
-_..-~
, ,
,'-'-
. '.:
'0
,".. ;,.;,.
, ',-",' ,
.
.t.
.
" ' ~
-.
, , 0
. .
.
, '.... 0'
..' - " '",
0
','
0
0,
.. :.-
'.
.
- '
0 ,
"
I-
I
1-- .
i--
J
I
\=-~
-,---,
_I,__-j
. I
¡
, .
I I
'---I
.y: I ,;, ¡
----_o----~---- i
..1,- ." "f'"
l,d/IIII,'1
.,... "-, II I
"f",-'JoJ' I.
'," . r1
... ", - í I
,"_."""~'jq,.:,(O; ::~:\l.1!~~<1
-,,~""".4_' "4-~
l:':'-:':S;'.j ~/~.!. ).f; ï':,'.C~!..!d'/
'.. - OH" .~ ~rl"~ ~:;::':~';dJ T1V
~.::;l.':'P....t\ ~.." --
'].lON
"'~~~ 0
/~
..
.
, 0
- ' .'
. '-, '
..
.
, r
.
. '
"oo.
,
"
.
- ,
, '
. ' '.'.
"
, .
..
,
'.
,
, ,
l~
]
C
~
'.'
.'
-.
, --..r
. '
!'
..
r
J 4 :'
3f7~¡f
([7
- '
..
.
.'
.
.
:Ã.
~.- ,--
. ". .
. .
.
, ,
I
-
I_-.~
r . .)./
~
~
.
¡
I
\
I
t
L
,
.
¡
I
i
}
1'/ -~
.~,
.
~
~
¡
1
I
I
¡
l
t
I
~
i
:1
I
0 - -';"f'UJ I
))j o:/i/xn'l ,
. ;:"'O
~,
I
i
0 -I
I
i
. ~
I
i
.. 1
f
f
i
I
.J
1
i
I
, ~
. '
.,
.
~ c
0..
.
, '
,
. '
,
.
, .
..
~ 1//3"
.
.
,. ~ ~
~ -iiL.
- .c'o
0
:
I
. ,
, .
~ .
~ :
,
~
,
..
~
.
::0
,:...
r
r ,r ,
t-
:"
'~ .
.,
t
.
,~
.
!:
~
r
,1
~
.~
'1
I'
.;
~
~
¡~
I'
I
!
.
!
~
"
.,
-
,
.
"
..
~~
f
~,
;,
~:..
~, II ..
j.
~r
.
i
-
. {
_.....--~(.~--,.... .-.. ~ --~-('
. -~-
. ...
.- - '- - . - - .'
:'-ff
.
.
.
..
\.
13 5/8.'-' 5000 psi Î'¡[SP BO? Assembly'
to be furnished by Contracto~ 2nd
inst,!lleg. on 13 3/8" casir:.g.-
,/
/
>f/
'Ç/
. t '.
\
't~ :)' " .HrO~L. " ,
j
I
0 ~
---:-_.O~ ~;7"'-' - .-
1 - _.~-
.
F . f
~ I i\ H:Ol?;{/UC O?EP.ATED
, -~.~. --- - ¡;¡:.~ ¥;.;LVc
r - LiiU A,u :..
. 'II .
" . t ' i La-TORO:;£" .
~ - ); L I (oplia/XlI)
.0 v ,~'n~~~ ., '"1,r I~~ r I I ~r-- ~,t L- .r
- ~l~ff"('~~?!4-1J~ -,2:"';:.~JI' . - -'¡:'~~~.:)~hl ¡. ~: ~- r,'+ - In
~-~~ ~'~E?jl', . rJL~~~n ú - .
é:rF O/? If}-ïOR()JE/ 1" r-J ;------~~a;;e;;tv/llJ.n.;;; '- -.
.. &
GATE VALVE ,
Came~on Type tlFn I Furnished by Contractor
'-TuroTShe<i þy-Uni-on - - - -- --
PiPé R.t!/~/S
- ~- g
.
,
,
'- I--r
~
...
. ---b-.-- - ~:j. ~ -.
.. .
t
~IIGLEO FILL l/? Lil/£
- I
. I
..
- I
.
- I'
-~
t-
(
t
.
u
-.
-
B!./IIO RAMS
-
. PIPE RA/,J,S
-
- - .-
.
.-
..
-
..
....
.
.
-
,
t;.... ... -. -)
c:'--t--,-J
I :. ~ I
. - ~-" --~. T -~----,' \. --.IF}'-~1--''\
. -+( ..........l.-- -:--" -+- "r- -J--
---a-;::::' -!tnn, , u- .ÿ4---
. 1 L___J 0
"I
. -
-
. Non::: :
ALL CHANG~S l't~UST HAVE WRITTEN
A??ROVAL 8Y THE Q[ST~ICï
ORILLI~~G SU?ERiNTEI'~O~~~T-
.
I
~
..
i~)""WM ß (&0
; 11."'0 .JRC ,
. ~ - 1'.,-.. . r
) sc..a.,t. "~"- ,
, -- ---¡,-¡--;,
STA un"::JrJ ,I P~~uç)'r""'R ,A5SF"/~L'Y
IIJ...."....,"t ..,-Y~('c. - ~- -Îl""
...
\t
~,
. .
o.
."
~ ¿.rd. ?,\'..JO ..0"2
...... o. ... "
"
. .
J""J{Ì,) 1 P?d ..i?lJôJ -.
~~vll .!..~tlJ.J -H_-!
. r). f. r c::
-çbUf?/:f (ììOS' ;)~dOOJ ¿ "Or:
. .
. ,
. .
I.'JpÁH :r;d OOOt dC;l;J ..02
. .
.
0
. .
.
..
.
'..
. - ..;
..
0" . ".0'. ~'.
0 .0
. "
.
. .
\
. ..'
I .
-¡;ld~/N 1I7J9 lOGe.
. ~--
~ ")
..
~~ -
I
- ~
/
.
'-
. -
.
~-
i
-
_'~1
. . \
0 . .
.
^ 79 Vi?! C;S'f/ . 5'I Hi H Ð no ò'1I.1-
D3.l.N3W:J;J a (lj If Nn ¿¡ f) NI~ JjJ ,,?~r¿1
..
. .
J
. ~.
øI
,.
..
J' -
:/
. . o' 0' 0 0
. 0
)
It
.
:' )
4
."
0
\.
-....
---
"".
. .
. . .'
. .
. .
0
0 0
'. 0
. .--
-
1
'- .
Q:::rnpdny U v1- ! ~~ ð \ ' J
- ------
fcs No Re~~ks
Is lli~ fe I'm it fC-A d l ta.~he1 .................,........................ 9~ -= == - -- ------- -- --
~ -- -- ---------- ---- ---- --- --
~
f"""-'ì . .-" Y."" i-' - 1'; nn /J('. Â
~, t- '~, -, 'f..L ......,.......... /--~z
fro i-. other \\,'e lIs. . . . . . . . . . - , . . . . . . .. p~
13 SllfficiC)1t tL"1~(~Ldi.cate:ì ,.lcreage â'Tail.'lble in tbj S p.nl .... .... . ~
& v~ll tJo. 1 r_~, I I l ,J1~ -1f!
1 tal} fJ > ~ ~ )r~ NC J Da. te
-- . -. --"-- -
(1) I[~~~ - 9-~ - 1~-_:J_fJ_~ì '!
Lease
CHECK LIST FOR t-.TIWI \',lF~ PFRrvIT7S
-----
)
. .
Is T, .-~ tl
.) œ 1o..::; \.À t - d ~r¡ -J. do;.; f in(.'"rl l-r,.") 1. .. - . .. ....... ........' ....
---
1
, .
If":: él ~_'C~(...l- f:i-erf-....:J ~-;-¡"""",- -ey Plat-, '"'....tt-':'C',-\.lF--l
~ ~ oJ'- ~t CÅ~ v . - ~ .. <Ã.l ~ ................................
Ne elr¿j
- .-- - -------- -
-- ------ ---
, rs ~ 1 1 C. ~¿ì tøi ~rcp;L I, ,t;e
. ~. ~: 1. I , 1 1::; .-
. .
r- Is well 1 r 'a t. ~j f:oper distan--::e
) . -to "-^... "-3 0'
-- -- - -- - -- -- ( ¿! ':':.':.:.. Ý- O:i,
- - -- - -,
/0-/0-19
- - --- - --
----------
-- ----- --- -
6.
--- -- -- ----
- -- --.
-- ----
~v-t~ \J Q.-J
D." Icr~D-ì7
~ J~
7.
Is \lell to œ de'liata:1 .............................................. ~ - -
I~ ~r;¡~ ~ only af~~ parry "...".".'..."'......'..-."'. ~~~
Can peJ::J<lÌt I::e approve:i I::efore ten--day \>.\'lit.......................... ~ .fJ:1
~s ~ra~,~e a 0000 ill fu=e ........................,......... ~ -
Is a cOr "'2 rvat ion order needed ............................,......... - ~
Is ~mi~~~ ~r~l n~ffi """"""""""""""""'" -- ~
Is cof'l.(luctor string providoo ........................................ æ
Is enough CEment used to circulate on conductor and surface......... t1tV
¿J 4. yi .tk - ¿ ~ ¥. 4r--
~-_!~ ----r '" ¿.. 4 ¡.._J~
t:;Lt~(/i u~ L fL~O
fL~
3.
9.
( 3) Admin. 1M
I D -I 0 - /C¡
o.
'- .
,_2.
...,
) .
'_,1.
5.
~'lill cement tie in sucface and inte~iate or prcduçtion strings... / '
/!ff2
( 4) Casg. ,e ¡fj)
. Fo-/L-71 \>0 - /
'-,./ r
l6.
Nill cement cover all known prcductive horizons.....................
ßf!Q
~
~
I(tfj)
-. 7 .
Hill surface casing protect fresh \\eter zones .......................
~8 .
~'J~ll all casing give ërlequate safety in collapse, tension and h.rcst..
,
( 5 ) roPE ,f /Yí)
/0 - Ib- 7'
19.
Does roPE have sufficient pressure rating - Test to ~oo
ps~g ..
Approval RecO':1Iænded :
lditional pcquiranents: ~,/ "'t!~--_. - ~ (;<0--'-,- }'~-~.'ð'- ~ ø; ~--=t ,.Ll~-, 30 ,/ ~ ~
/"'--""'V'8tt>t:>' 4!:Þ. ,/... -,ø~'-~~, ~'--J ".øÁ ~. -r-:. (1'2"- -,ø- '6Þ.VC()- -. ~- ~ ~ ~- (ð1.~ - (~ /n-~~-79.
Engineering:
LCS r4-BEW '-..
RAD R~~
Gool
m~
ViVA
JAL
---- ---
-- --------------
.---
---- -- -
rev: 06/21/7
,~,
-...:ø'il". '
~, ',;M.#[ .~;....-
'" ~~. " -- /
- ....'/I.~~j;f*
. - r'o ,
-,,\i;
.' , -'
} .-, ${~", ' <-
. 'â;""~~~" .',.-..-...............-
--- _. ~--
_..",,- ~,. ."'¡; ,
---
1+.
4- Q...
C H -,
........ ,-, ~
f " ~ <>
:=:,
~ '"' !
---....,-- .:::.;-
I ~ ;; I
,- ...
>-- ~"
.r:; ~
0 (J
Q H
C,,:::: ~
U)
::í ..,.,
~ ~ J
cÜ+J
"rl ~
+J
.,-j
s:: (J) t\.
1-1 (J) ~
cÜ 'J..
d V-J
,
.t
. ,
','!!f.:.
~~-
.---d
Well History File
APPENDIX
Information of detailed nature that is not
,
particularly gennane to the Well Pennitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
\
~!\t LlgI '1 NO! J¡ 't J I~ Iti3A
IdYl 91'1
**********************
.-.-... .-....,.-.. ......
*----H3~d3gWn1HJg----*
...,....-.--.-..-... ..-..
**********************
. *
* *
. ..
**********************
('ðJ (i1 u~dd)
/ #: air!JI / !~1
. ..
",-..
.......,
-"---
~ ~
~ ~ J-/f.
~ ~ ~q
~" Cb &.
~ ,~~ ~~4J
<:.~ rg IT
.~ ."
<:s
,
.,
~ ..
-.....,/ .
, /""'
~
~
SERVICE NAME :EDIT
DATE :81/01/16
ORIGIN I
HEEL NAME :R.M.O.C.
CONTINUATION' :01
PREVIOUS REEL:
COMMENTS :TAPE DENSITY
REFJJ HEADER
SERVICE NAME :~OIT
DATE :81/01/16
:.JRIGIN :NAMl
TAPE NAM! 161301
Co~TINUATION # :OJ
PREVIOUS TAPE:
COMMENTS :TAPE COMMENTS
********** EUF **********
)~»»>800 BPI.~CC<~~
TAP!: HEADER
-~-----
FILF. HEADER
rILE NAME :EDIT .001
SERVICE' NAME:
VERSION # :
DATE:
MAXIMUM LENGTH: 1024
~~ ILE TYP~: :
PREVIOUS FILE :-
COMPANY:
UNION OIL OF CAlJI~6~L SITE INFORMATION
I4ELL:
'fRAIl! RIDGE 1
F"lELD:
wlltOCAT
RANGE:
RANGf
rUwrJ:
TOwNSHIP
SECTIOf\¡:
SE;CTION
~
CJUNTY:
MAT-SO
CtlMPONEIT BLOCK' 001
TíPE 000
i.'iES8NTATIDN CODE 065
SIZE 020
C8rSGORI 000
~~EMONIC CN
UlfIT
C1Jjì"ONENT BLOCK' 002
TYPE 000
R8PIESENTATtON caOE 065
SIZE 015
CI~EGORY 000
MNEMO~IC WN
UNlIT
CtJ"'ONENT BLOCK t 003
tYPE: 000
R&PRESENTATION CODE 065
SIZE 010
c.rEGORY 000
~.EMONIC FN
OMIT
CQ~PONENT 8~QCK # 004
TYPE 000
R~rIESENTATION CODE 065
SIZE 005
C EGORI 000
M MONIC RANG
U Nwl T
CD~"PONENT BLOCK' 005
TYÞE 000
RE.¡ESENTATION CODE 065
SIze 008
CldfEGORY 000
Mf'Jt~DNtC TOWN
UN¡T
COMPONENT
TYPE
R£"RE8ENTAl'lOH
SIZE
CAfEGOR,y
'""MNE:~ONIC
UNIT
CO¥PONENT 8LOCK .
TYf.)E
BLOCK" 00&
000
CODi 065
007
000
SECT
~
007
000
Sf ATE:
C3UNTRY:
PORMAT;
~
ALASI<A
USA
.
COMM!NT
IAPE 11 A COMPOSITE OF ~UNI 1~4.
RùN 4 BHC DATA ~AS TOTALLY HAND DIGITIZED.
RUN 3 SHC GR WAS HAND DIGITIZED
RùN 3 CNLFDC DATA (EXCEPT GR) wAs HAND DIGITIZeD
WHERE THE CURVES WERI ON THE rIELOPRINT.
DATA FORMAT RECORD
SIgl REPR CODE
1 66
4 7'.a
4 65
1 66
~;\lTRY B[,OCKS
TYPE
4
8
9
0
DATUM SPECIFICATION BLOCKS
~~EM SEkVJCE OROFR NO UNIT API
LOG
fT 0
MY ;
OHMM 7
08M", 7
OHMM 7
PO 42
G/C3 42
G/C3 42
42
42
42
41
42
60
60
60
DEPT
SF?
SFLU
IIJM
lLO
NPHI
R~OB
DRAa
~RAT
rCNL
N C rHJ
CALI
GR
Of
CALI
GR
OIL
OJ [J
DIL
OIL
FDN
FDN
P"DN
FPN
FDN
rON
FDN
f[)N
SHC
8HC
BHC
IN
GAPI
US/,.
IN
GAPI
API API
TlfE ChAIS
0 0
1 0
0 0
0 0
12 46
68 2
35 1
44 (}
42 1
)4 9)
34 92
3i )
3132
52 J1
28 3
31 32
--~-
API FILE
MOD NO.
0 0
() 0
0 0
00
0 0
0 0
0 0
0 ()
0 0
0 0
0 0
0 0
0 0
0 Ð
0 0
0 0
ëiTIG,OIt'
,,-.,t.tNEMONIC
Ull:r
C'iMPONENT BLOCK' 008
T PE 000
R'~RESENTATION CODE ObS
5 ZE 010
CITiGORI 000
MREMQNIC STAT
Uft'If
CQMPONENT 8LOCK # 009
TYPE 000
@I'~.E&ENTATION CODE 065
SIZE 005
C"~Go."r 000
~KE~ONIC CTR!
UÞlJI T
COMPON¡Nf 8LOCK # 001
r~P€ 000
'lrftE,ôENTATI0N CODE 065
SIZE 001
i~~~g~~! ~R~s
U Nfl ,T
SIZE
4
4
4
4 ^
4
4
4
"
4
4
4
4
4
4
4
4
ENTRY
1
bO
.tIN
0
PROCESS
LEVEL
0
()
0
0
0
0
0
()
0
0
0
0
0
0
0
()
SAMPLE
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
000
COON
-.-.....
REPR
CODE
68
68
68
&8
68
68
68
&8
68
be
68
68
68
68
68
b8
OEPT
ILM
RHOß
fCNL
GR
GR
DEPT
ILM
({HOB
PCNt
GR
GR
OEPT
lLM
RHOB
FCNL
G~
GR
DEP:r
ILM
RHOtj
rCNL
GR
GR
DEPT
ILM
RHOa
FCNL
GR
GR
DEPT
ILM
RHOB
rcNt
GR
GR
DEPT
ILM
RHOS
F'CNL
GR
GR
OEPT
ILM
RHO6
rCNt.
GR
,AR
.,¿PT
ILM
RHga
fC' /'.1 L
-
12033.5000
999.250°
1.667'
1062.0000
68.0625
999,2500
12000,0000
9.2890
2,5)32
1386.ÐÐOO
65,4375
62.2812
11tOO.OOQØ
14.7343
2.0146
359.5000
66.4375
32.2500
11800.0000
10.3281
2.4414
765.0000
b4.5625
62.4062
11700.0000
Q.1953
2.4628
624.5000
6$.0625
63.3125
l1bOO.OOOO
8.3359
2.4218
499.2100
67.6250
69.1871
11500.0000
9.64B4
2.2109
670.5000
48.1562
44.218'
11400.0000
4.9492
2.4355
515.QQQQ
57.8750
46.6914
11300.0000
13.1250
2.2441
656,0000
-
nATA
SP
ILP
OlAf)
p,. C N IJ
Dr
SP
Ito
DRHO
NCNf~
OT
Sf
ILO
DItHO
NC~IfJ
Of
5P
ILD
DHHO
NCNI"
DT
SP
ILD
DRHO
NCNt
DT
51>
ILD
DRHO
N CN IJ
[)1'
Sf
ILO
DRHO
NCML
DT
SP
ILD
DRHn
NCþ,UJ
Dr
SP
ILO
oaHU
NCNt,
.,
'99.ZtOð
999.2500
0.0151
2208.0000
999.2500
.,
..
..
..
23.65f'2
8.7.'7
O.O22Q
2800.0000
92.0000
..
)1.21'7
10.791?
t.0716
1492.0000
112.5625
..
43.21R1
11 . 11 71,'
0.1020
2514.QOQO
85.3150
..
31.2187
9.0859
0.1201.
2282.0000
94.1875
...
38.7812
7.8'45
0.1206
2014.0000
92.ooon
..
52.71$7
9.8046
0.0122
2366.0000
95.7500
...
21.21A7
4.9765
0.0605
1976.000Q
92.2695
~
41.15."
14.01::>t')
0.0009
2832.0000
..
..
srt..tJ
NPHI
NRAT
CALI
CAbI
SFLU
NPHl~
NRAT
CALI
CALI
SFLIJ
NPRI
NRA!
CALI
C A L~I
Sfo"LU
NPHI
NRAT
CALI
CALI
SFLtJ
r~PHl
NRAT
CALI
CAt,I
SFLU
NPII
P\JRAT
CALI
CALI
SFLsU
NPHI
MIA!
CALI
CAbI
SFLU
, NPHI
NRAT
CALI
CALI
6FLU
NPHI
: NRAf
CA[¡I
..
999.2500
22.5097
1.9667
12.2500
999.2500
..
26.2343
15.2343
1.9794
12.3984
10.4531
81.7500
46.7285
3.8945
11.9921
10.6250
11.6B75
34.8144
3.2402
12.2812
10.710Q
16.1406
38.8183
3.4511
11.882B
10.4453
6.6406
42.4804
3.6601
12.0781
9.83SQ
8.3515
34.6191
3.2187
11.8125
10.2421
5.4609
40.0390
3.5312
12.2134
10.5395
~
12.5703
31.2011
3.0234
11.6093
,
~PT
."M
RHOB
rCHL
GR
GR
DEPT
ILM
RHOS
FCNL
GR
GR
OEPT
ILM
RHOB
rCNL
GR
GR
DEPT
ILM
RHOB
FCNL
GR
GR
DEPT
ILM
RHOB
rCNt..
GR
GR
OEPT
I lJM
RHOB
FCNL
GR
GR
DEPT
ILM
RHO~
FCNt
GR
GR
DEPT
lLM
RHOS
F'CN L
GR
GR
OEPI
ILM
RHOS
rcNt
GR
GR
DEPT
. _H___I L M
- ~.-.~-~.
11200.0000
12.4413
2.2773
717.0000
53.4375
49.9257
11100.0000
11.1093
2.2246
b8B.OOOO
55.5625
54.3574
11000.0000
13.9765
2.3574
1107.0000
4B.2500
41.0173
10900.0000
14.8984
2.2153
801.0000
49.1875
41.3984
10800.0000
10.3671
2.2441
632.5000
47.71R7
48.1621
10700.0QQO
6.4023
2.1085
466.7500
79 . 250 ()
44.t)O62
10600.0000
15.8750
2.2402
133.0000
&5.3125
67.0273
10500.0000
5.5213
2.1183
439.5000
64.8150
73.6250
10400.0000
14.1437
2.2586
940. 5 (HH>
74.6815
69.3242
10300.000.0
-- h - Q 1 7 Q
SP
ILD
DRHO
ICNt
OT
SP
ILD
DRHA
NCNrJ
DT
SP
ILL)
DRHO
t4CNJ¡
D1
SP
IIIf)
DRMO
NCNTI
DT
SP
ILO
DRHfl
ICNt.
DT
SP
ILtJ
DRHQ
NCNI1
D1
SP
ItO
DRtfO
NCHI,}
DT
SP
XLf)
DRMO
NCNJÞ
DT
5P
ILl;)
DRHn
NCNL
OT
SP
Tl. f)
..
43. 2 v--'-
Ij.4~~L
0.00-,'"
214&.QO8°
91.51-5
..
44.11.2
11.710Q
Q.Ot3'
2364.0000
92.4414
...
44.2187
14"'" j'~56 '
0:0146
2962.. OO*.H)
90.8125
..
43.7187
16.1875
0.0122
2592.0000
95. EHJ45
..
47.2812
10.89t4
0.0102
2212.0000
99.1171
..
42.1562
6.9257
0.03'1
1967.0000
94.7265
...
41.2187
17.5J12
0.0244
2J 1 C>. (:)0_0
94.0916
..
3j.1562
5.8710
Q.Oa73
1782.0000
101.4218
-
47.7187
J 4."16,16
999.2500
2700. 87".'°0'
SS. IA7
...
..
37.2187
7.0Q~7
SFLU
NPHI
NRAT
CALI
CALI
11.2734
32.1289
3.0937
11.9062
10.2490
.-...,
S flt,1
NÞRI
NRAt
CALI
CALI
9 9765
34:0820
3.1894
11.9531
10.5825
SFLU
NPHI
NRAT
CAwl
CALI
16.5156
25.0976
2.6230
11.8671
10.6572
srLU
NPHI
N~A'".
CAL
CALI
14.3593
30.224,6
2.9648
11.8046
10.5883
SfLU
NPtfI
NRAT
CALI
CALI
9.1640
37.3535
3.3789
12.1640
10.6816
srLU
NPHI
NtA'l
CALI
CALI
5.6328
43.9453
3.7832
13.6953
10.8110
SFLU
NPfiI
NR~T
C/ltJI
CALI
22.7812
34.3750
3.1992
11.6328
10.5932
SFLU
NPHI
NBAt'
CALI
CALI,
4.8203
32.3027
3.7b36
11.6533
10.6469
SFLU
NihiI<
t.JRAT
CALI
C A £J I
14.7656
32.7910
2.9300
11.6933
10.5996
SFLU
f<JÞHT
6.2421
lq_f\7~A
"" 1'\
Gf<
OE;pr
ILM
RHOti
r:CNL
GR
GR
DEPT
ILM
RHOB
fCNL
GR
GR
DE;Pr
ILt4
RHOB
FCNL
GR
GR
OEPT
ILM
RHOB
FCNt.
GR
GR
OEPT
ILM
RHOB
FCNL
GR
GR
DEPT
ILM
RHOB
fCNL
GR
GR
DEPT
ILM
RHOB
FCNL
GR
GR
Ot~PT
ILM
RHOB
FCNL
GR
GR
DF.PT
Tf.M
~OH
,. CNL
GR
GR
'-
-
t) t'J . It. .J7
71.4843
10200.QQOO
5.9062
2.1940
580.5000
b4.187~
55.1910
10100.000Q
9.1875
2.219)
676.0000
61.4062
69.1367
10000.0000
8.6640
2.2445
53'.5000
45.4062
45.9649
9900.0000
12.2500
2.2519
680.0000
37.5000
35.2910
9800.0000
9.8515
2 0574
581:5000
;34.8437
31.3554
9700.0000
12.2500
2.2261
999.2500
35.9687
28.7128
9600.0000
13.2343
2.2189
999.2500
31.4218
29.6250
9500.0000
18.5312
2.3.1$
999.2500
40.8437
4'2.(\119
9400.0000
13.4609
2 2230
999:25()()
38.2812
29.7701
..
..
..
DT
SP
IL"
DRHO
NCNJ-l
01
51>
ILO
DRHO
NCNI.
Of
SP
ILO
DRHO
"CHI..
DT
&P
lLn
DKRa
NCNIJ
D!'
SP
ILD
DRHO
NCNtJ
DT
SF
lLf1
DRAO
NCNtl
DT
SP
ILO
DRHO
NCNL
DT
Sf
ILl'
DPHO
NCNt-l
OT
SP
ILD
DRHO
NCt4L
DT
9~2. 2t'1 ~2
-
36.71R7
5.83"
999.2500
2392.0000
99.2411
..
..
39.1562
8.3906
999.21{)0
2150.0000
9<j.3203
..
..
49.21A7
9.5'03
999.2500
180l.QOOO
99.6992
-
..
13.3Q46
11.9375
999.2500
2504.0000
99.4687
..
..
25.5931
8.601'
999.2500
2056.()()OD
102.bO93
-
..
34.3125
12.4843
9,'.2500
999.2500
99.2812
..
..
-
28.8906
13,.2'78
Q99.2500
999.250..
95.01B1
..
..
..
32.8437
17.82R1
999.250.
999.2500
84.8118
..
-
..
22.3437
12.7~
999.2~
9".3~ '"
92.953',
..
..
eALt
SFLU
£fPYI
NRAT
CALi
CALI
8'110
NPHI
NltA!
CALI
CAI.I
SfLU
MPHI
NRAT
CALI
CALI
SFLU
NPHI
NRAT
CALI
CALI
S~'LU
PlPHI
NRAT
CALI
CALI
SFLU
NPHI
NRAT
CALI
CALI
SFLU
NPHI
NRAT
CALI
CALI
5'ùU
NPHI
NRAT
CALI
CALI
SFLU
N'HI
NRAT
CALI
CALI
--~
iõ;i;iò
5.6953
37.7773
3.8867
18.2617
10.7026
7.4531
45.8886
3.7832
14.0263
10.6459
10.3984
28.4921
3.2890
12.2880
10.6909
-
11.2343
33.4960
3.2187
13.5600
999.2500
-
10.0234
50.0371
3.4863
12.4780
999.2500
..
12.1718
36.4199
999.2500
12.1069
999.2500
..
-
12.2812
31.3222
999.2500
12.1035
999.2500
..
..
18.5156
29.0966
999.2500
12.0546
999.2500
..
-
15.5000
41.7285
99Q.2500
12.9423
999.2500
~
-
RHOS
~NL
4
GR
OgPT
ILM
RHOS
rCNL
GR
GR
OEPT
It,t41
RliDe
rCNL
GR
GR
DE?T
ILM
RHOB
rCNt.
GR
GR
OEPT
ILÑt
RHoa
F'CN L
GR
GR
OEI:'T
ILM
RHoa
rCNL
GR
GR
DEPT
ILM
RHOS
f.i~CNL
GR
GR
Df~P r
11,,14
RHOB
rCN£.¡
GR
GR
DEPT
It,M
RHQ8
f'CN ù
GR
GR
Dt::PT
IL"
RHOB
rCNt,
GR
-
í;ØtJ1
999.2500
37.'175
31.9277
9200.0000
13.4"1
2.2409
999.2'°0
27.1875
24.8378
9100.0°,'.00
22.7031
2 4394
999:2500
.2.6115
37.8750
9000.0000
1 ~ .. 6' 6 25
2.2570
99', . 2~OO
32.2187
30.8867
89'0.0000
15.2968
2.1689
999.2500
J7.4t6a
30.5332
8800.0000
20.734)
2.2399
999.2100
34.0000
30.7919
8700.0000
25.6875
2.1a53
999.2500
45."12
40.3847
8600.0000
26.9331
2.2021
999.2100
46.0000
)9.4101
8500.0000
15.5156
2.1671
999.2500
67.1811
59.4902
8400.0000
25.5116
2.1733
999.2500
50..3750
..
..
..
-
-
-
..
.
-
DAMn
NCNf.
Dr
SP
¡liD
DRHO
NCNIJ
DT
sp
lLO
DAHO
NCNI,
Of
SP
ILl>
ORHO
ICNt;
OT
Sf
tLD
DRNO
N eN fJ
DT
SP
LLÐ
DRHO
NCNIJ
DT
if
11,,0
DIttO
NCNIJ
Df
SP
ILl)
ORAD
N~CNll
DT
Sir
ILO
DR fiC
NCNL
Of
SP
ILD
[)RHO
HC N"{J
J')T
..
"'~-_.-
999.2
lil.14" ,
-
-
34.250n
i 3 .!st'a 5
999.2500
, " ..".i.
100.3125
-
..
..
37.i131
21.9218
tt9.2lto
999.2500
'1.2It,1
..
-
-~ ~ ..-
...1' .
CALI
CALI
SFLU
"PII
NRAT
IAbI
CALI
Sf taW
NPRI
NRAr
CALI
CALI
..
28.4115 ' SFLU
9~3:~~ft~ Ii =~f+'
"'.ltO(;) I,{ CALI,
99.21R'1 " CÞ.LI
-
..
..
i'.I193
16.019J
'99.-110$
999.25no
1-01.9181
-
-
..
27.5625
21.t687
999.2500
9" 1'10
10S:t71A
..
-
-
30.,2011
29.5937
ti"- lit.
999.2500
tlS.lll'
..
-
..
32.3125
34.1111
9'99.251\0
9" . I lilt)
113.99'05
-
..
..
29.862&
19.0]J2
,," . 2500
999.2'500
11 8 . tlt;S
-
..
-
27.7343
31.9218
999.25no
9-".1,100
1'-O..7~4~
-
..
SP'LU
NÞHI
MIA!
CÄLI
CAllI
SF {J U
NPll,
NRAT
C,AtJX,
CALI
SFt.U
NPRI
NIAT
CALI
CAúl
SFLU
NPHI
NRAT
CA &..1
CAl,I
SFLU
UPflI
~NRAI. .
C1.\L
CìUJI,
SFLU
NPKI
NRAT
CALI,
CALT
..
,jj;2;ÓÕ
12.7617
999.2500
..-..
..
-
11.0234
37 4140
999:2500
12.4038
999.2500
-
..
34.7187
27.0634
999.2500
11.8666
999.2500
-
..
15.3828
.38.1347
999.2500
12.0795
999.2500
-
..
18.9531
33.9765
999.2500
11.9462
999.2500
..
-
19.9687
36.1816
999.2500
11.9067
999.2500
-
..
24.3750
39.8710
999.2500
12.2114
999.2500
-
-
25.9218
34.7851
999.2500
11.7749
999.2500
-
..
lJ.7734
36.0937
999.2500
11.9809
999.2500
..
-
24.5156
37.5253
999.2500
911.8,276
<)q_?~OO
-
DEfT
ILM
RHOa
FCNL
GR
GR
()r~plr
ILM
RHOB
fCNL
GR
GR
DEPT
lLM
RHOS
f'CNtf
GR
GR
O!::PT
1£.,14
RHOa
FCNL
GR
GR
DEPT
ILM
RHOB
f~CNL
GR
GR
OEPT
ILM
RHOB
rCNL
GR
GR
DEPT
ILM
RHOa
[-CN L
GR
GR
DEPt'
ILM
RHOH
PCNl.
GR
GR
DEPT
I [1M
RHOB
rCNL
~
DEPT
ILM
RI1DB
..
S306.la':(j
13.5859
2.1110
999.2500
64.9750
55.2734
8200.0000
20.1406
2.1291
999.25ðO
42.1875
39.2343
8100.0000
29.0937
2.198)
999.2500
45.5000
42.4199
8000.0000
14.4843
~.O520
999.2500
39.5937
32.3750
7900.nOOe
16.8125
2.1108
999.2500
30.8906
26.2656
7800.0000
23.6250
2.1779
999.2500
23.2031
24.6718
1100.0000
16.0000
2.1134
999.2500
47.2100
38.7851
7000.0000
25.4218
2.2216
999.2500
44.6562
37.3906
7500.0000
30.3593
2.1657
99Q.2500
43.1250
35.5996
7400.0000
20.0937
_~_2.'665
..
..
..
..
..
..
..
..
a.
ILP
DRHO
NCNIJ
DT
SP
ILD
DRHO
NCNt,.
OT
If
ILf>
nRMO
NCNlJ
DT
SP
ILP
DRHn
MCN fJ
DT
SP
ILO
DRAD
NCNIJ
Dr
SP
lLO
DRHO
NCJHJ
OT
SP
ILl)
DRHO
N C P>ìlt
DT
SP
II..D
ORHO
MCNL
DT
Sf
ILP
DaMO
NCNIJ
Df
SF
ILD
DRHO
..
" ¡,il~l"~
14.9843
99'.2100 '
999.2500
116.8156
..
..
..
28.!)625
21.1125
999.2500
"9.2100
105.421R
..
..
..
28.9t87
40.5000
,,'.210G
999.2500
123.3150
..
..
..
18.5156
15.29:Ie
999.250n
"9.2100
110.40ñ2
..
..
..
25.0781
18.3125
999.2500
999.2500
111.2031
..
..
..
32.3125
26.3593
999.2500
999.2500
119.5625
..
..
..
25.5625
17.4531
999.2500
999.2500
115.9218
..
..
..
31.9843
32.'250
999.2500
999.2500
119.7656
..
..
..
27.4375
40.9375
9'9.~StO
Q99.2500
122.5781
~
..
..
..
34.0625
24.1,250
999.2500
-
I¡,:IJ;I
NPHI
taRA'
CALI
CALI
SfLU
NPHI
NRAT
CALI
CALI
SFLU
NPHI
MRAr
CALI
CALI
SFLU
NPHI
NRAT
CAli,};
CALI
SFLU
NPHI
NRAT
CALI
CALI
SFLU
NPHI
NRAT
CALI
CALI
Sf'LU
~JPHI
NRAT
CALI
CAfJI
SFLU
NPHI.
rnu\ T
CALI
CALI
5FLU
NPHI
NRAf
CAl,I
CALI.
SFLU
NPrfI
NRAT
..
11.2968
43.7187
999.2500
12.6752
999.2500
..
...
18.2656
46.5078
999.2500
11.7597
999.2500
...
..
30.8125
35.4492
999.2500
11.7998
999.2500
..
...
13.4531
49.3398
999.2500
12.6196
999.2500
-
...
14.8828
45.7519
999.2500
12.2597
999.2500
...
-
22.6250
41.8007
999.2500
11.8203
999.2500
...
...
13.5468
46.8105
999.2500
12.1235
999.2500
-
-
23.9375
36 0898
999:2500
11.7114
999.2500
...
.
29.9062
36.75J9
999.2500
11.8505
999.2500
~
.,
..
17.4843
39.6523
9QQ.2t;OO
GR
r',
";P1
ILM
RHOa
FCNL
GR
GR
OEPT
IliM
RHOB
FCNL
GR
GR
DEFT
ILM
RNOB
fCNL
GR
GR
OE;PT
IIi,M
RHOB
rCNL
GR
GR
OEPT
lLM
RHOS
FCN tJ
GR
GR
DEPr
ILM
RHOB
FCNL
GR
GR
DEfT
ILM
RHoa
FCNL
GR
GR
DEPT
lLM
RHOB
F'CNL
GR
GR
DE'!
lLM
RHoa
F'CNL
GR
GR
DF-pr
-
51;41ð1
7300.00GO
28.4531
2.1921
999.2500
42.5QaQ
38.5917
7200.0000
27.8281
2.2216
999.2500
3Q.OOOO
34.7402
7100.0000
26.4843
.2.1860
999.2500
42.1562
34.7675
7000.0000
33.6815
2.2277
99'.2100
39.6250
40.0917
6900.0000
31.4843
2.2119
999.2500
41.4375
3B.3066
6800.0000
35.4062
2.2108
9'9.2$00
43.1562
37.'531
6700.0000
41.7812
2.2683
999.2500
i9.3437
38.0605
6600.0000
94.9376
2.3950
999.~5QO
61.9062
52.2265
650t).OOOQ
47.4375
2 2454
999:2500
48.¡1'7
44.1210
6400.0000
....
....
.,
....
.,
-
.,
....
SP
ILP
DRHD
NCNf1
01'
SP
ILl>
ORHO
NC~IIJ
01
.$p
ILD
ORNe
NCNrJ
DT
SP
ILl>
DRHO
NC"!.,
DT
IP
ILD
DRNe
NCNI_,
DT
SP
lLP
ORHn
N C ,'41,
DT
$,P
ILO
DARn
N eM fJ
DT
SP
ILD
DRHO
Nt N 1.1
DT
SP
It"
DittO
Mcf\1r,
DT
-_SP
----~-~-
....
~.
3J.59 .
41.7SðÕ
"'.1100
999.2500
123.1121
..
...
..
34.0625
31.8125
999.2500
999.2100 '
121.1975
...
..
..
35.'37.
36.1250
"t.~IPø
999.2500
124.2812
..
...
..
36.5625
"..1,,'5,'.'.
999.2500
"9.2"0
121.7968
-
..
..
)7.'315
51.4375
"9 it JI.Of,>
999.2500
"21.80ÐO
..
...
..
41.1975
(Ji.IOf)Ð
999.2500
,99.15,00
121.2343
....
..
..
42.3125
74.0000
,,'.lltO
999.2500
117.t4'8
..
..
...
39.5000
121.')75
999.2500
99'.2510
94.3593
...
..
....
,¡tS71
123:5000
"'.4600
999.2500
107.2656
....
...
..
43.112!'
-..--
SF[,U
NPHI
MRAT
CALI
C.AL,!
SFLU
NPtlI
NRAT
CAt.l
CALI
srLU
NPHI
IRAr
CALI
CALI
SFLU
NPMI
NRAT
CALI
CALI
SFLU
NPHI
HiltI'
CALI
C¡IJI.
SFLO
NPHI
NRAT
C.LJ;
CALI
SfLU
NPJ.fI
NRAT
CALI
CALI"
SFLU
, NPHI
t~R AT
CALI
CALI
srL.U
NPHI
NIA!
CALI
CALI
SFLtJ
~--.-...~...,.
~
28.4531
33.4570
- 999.2500
11.7202
... 999.2500
27.4843
34.9394
... 999.2500
12.11f>2
... 999.2500
26.0781
38.4296
. 999.2500
12.2915
. 999.2500
33.8750
35.0937
.. 999.2500
12.4663
... 999.2500
36.3125
36.6464
., 999.2500
12.646q
. 999.2500
51.9375
39.4179
- 999.2500
12.0209
.... 999.2500
59.5312
37.9824
... 999.2500
12.1992
. 999.2500
117.9375
20.6591
.. 999.2500
12.3935
- 999.2500
9~.5000
2 .8388
., 999.2500
12.3652
., 999.2500
111_'1000
FCNL
GR
GR
DEFT
IL~
RHeB
FCfIIL
GR
GR
DEPT
Ib14
RHOB
FCNL
GR
GR
DEPT
lLM
RHOB
FCNL
GR
GR
DEPT
lLM
RHOB
FCNL
GR
GR
DEPT
ILM
RHOa
f~CNL
GR
GR
'-
DEPT
ILM
RHOB
f'CNL
GR
GR
DEPT
ILM
RHOa
fC~4 L
GR
GR
DEPT
ILM
RHOB
rcNt
GF
GR
)a:PT
,M
ntfOe
fCNL
GR
GR
....
"';21'°
43.9375
41.1148
6300.0000
66.8750
2.4'92
999.2500
46.3437
43.1992
6200.0000
44.9)75
2 3057
999:2500
39.7500
37.2019
6100.0000
130.2500
2.36'7
999.2500
35.9"1
35.1582
bOOO.OOOO
81~8125
2.2871
999.2500
39.7500
33.8183
5900.0000
40.8750
2.2249
999.2500
39.6'7$
36.2832
5800.0000
68.0625
2.4589
999.2500
35.6875
36.0449
5700.0000
82.6875
2.4899
999.2500
19.0625
36.0410
5600.0000
64.0625
2.4105
"," 9.2509
36.1187
16.3164
55QO.OOOO
79.4375
2 4464
999:2500
)8.3121
37.7910
..
..
....
....
..
..
-
..
....
'8M'L
DT
Sf
ILI1
DAHO
NCNIJ
DT
SP
¡LP
DR~O
NeN!,
DT
8P
ILO
DRtlD
NCNIJ
DT
SP
ILl)
DRHO
ICNt.
DT
SP
ILtO
DRHO
NCNJ.I
DT
SP
ILl)
D~HO
NCN{J
OT
SEt
ILl)
DIU.tO
NCNL
t>T
SP
ILa
DRRn
Nt.v
OT
51'
ILf)
DIUiO
NCNlt
Of
..
IS.",; \,ft",',';,';, ;'',',',' '.,!I'f.,',;c,;,;,"",',; " J-: ;,.,i!Ji',; '¡~"",,'
':7 '7/1. ~"\J'~
99.5156
..
43.6875
184.2500
9".2100
999.2500
'9.2187
..
-
..
44.7181
146.2180
999.2500
"'.2S00
124.8125
...
..
..
44.'8'7
183.2500
"9.250.
999.2500
108.7187
....
..
..
38.5625
142.¡1S0
999.250Ô
999.2100
99.4843
..
..
..
36.5937
99.7500
999.2500
999.2500
130.1112
..
..
..
39.9375
1.2.1750
999.2500
"'.2500
122.7187
-
..
..
36.6875
211.0000
99.9.2500
999.2500
91.0931
..
..
..
41.187!,
It>4.17'.
999.2500
999.25ÐO
99.5156
-
..
....
29.4511
211.2~
9' 9 .. 2,~ Ò "'.'
999.25 0
92.3750
..
....
8f¡Et
SFf.sU
f\JPHI
NRAr
CALI
CAtsI
SF{,U
tlPftI
NRAT
CALtl
CALI
SFLU
NPHI
NRAt
CALI
CAL,1
SFtJU
~PKI
NRAT
CAtJI
CALI
SFLU
NPHI
NRAT
CALI
CALI
Sf"LU
NPHI
NRAT
CAL¡
CALI
SFLU
NPHI
NRAT
CALI
CAllI
SFLU
NPHI,
NRAT
CALI
CALI
SFL.U
NPHI
f'JRAT
CALI
CALI
--~.-....-~
12.2431
- 999.2500
159.2500
18.8535
.. 9~9.2S00
12.4814
.. 999.2500
87.5625
33.86~2
- 999.25 0
12.1650
- 999.2500
165.7500
32.7851
.. 999.2500
15.1601
.... 999.2500
91.5000
38.7382
.. 999.2500
12.1718
.. 999.2500
100.5000
33.8928
- 999.2500
12.1777
.. 999.2500
133.2500
18.9671
- 999.2500
12.7451
.. 999.2500
147.7500
17.4277
.... 999.2500
12.3374
.. 999.2500
129.0000
2ä.3974
.. 99-.2500
12 1201
.. 999:2500
108.5000 ~
21.9570
.. 999.2500
12.5244
.. 999.2500
.....~.. .a.
ILM
~>i 0 8
':HL
GR
Gilt
DEP'f
ILP.\
RHOa
rCNL
GIt
GR-
DEPt'
IL""
RHOB
rCNt..
GR
GR
DEPT
ILM
RHOS
FCNL
GR
GR
DEPT
ILM
RHOB
rCNL
GR
GR
D!PT
ILM
RHOS
F'CNL
GR
GR
OEPT
ILM
RHOB
£t"CN L
GR
GR
DEPT
ILM
RHOS
F'CNL
GR
GR
DEPT
ILM
RHUB
[CNL
GR
GR
DEP'f
ILA4
RHO!
t:' ,.. í\I r
..
""~vv.vvvv
72.1000
2.4617
99'.2500
43.0000
39.7031
53~OO.OOQ0
10ij.3125
2.4930
999.2500
44.0090
40.9746
5200.0000
62.$QQO
2.4359
99'.2IQO
54.0000
45.4661
5100.0000
43.9062
2.4486
999.2500
56.3437
51.3593
5000.0000
27.6250
2.4003
999.2500
50.4687
41.2109
4900.0000
57.8125
:2 5,1 '4
999:2500
53.0937
47.0507
4800.0000
)).5312
2.1647
99'.2100
45.7812
40.5488
4100.0000
47.1562
2.3375
999.2500
51.3125
49.0449
4600.0000
54.532,,2
2.4855
9".21Qi()
67.2500
59.1"06
4500.QOOQ
65.1250
24fl'
oaö.iI')t:"I\t\
..
..
..
..
..
..
..
..
ur-
I'~D
DRHn
NCfllJ
DT
8P
ILO
IRK,9
NCNr,
DT
SP
¡liD
DRHO
le"l..
DT
SP
ILO
IRHO
NCNJJ
DT
SP
ItO
DRHO
NtNL
OT
IP
ILO
DANa
NCNT,
01
SP
ILl)
DRHn
ICNt.
DT
SP
ILO
DR~()
NCNT,
or
SP
XL"
úRHO
leN Li
01
Sf
ILO
URHQ
I\if""KU.
..
~U."'C]"'"
~'.~~'.:"~.~.
999.2~,..(
93.40D¿
..
..
¡(J.tO)!
148.3750
",.}a5;O
999.2500
91.9966
..
..
..
25.4375
1J2.,,)'50
99Q.250n
9".a','
92.3901)
..
..
..
15 .,ii' t fit
80.3125
"9.2100
999.2500
85.,8& 25
..
..
..
6.9296 '
JO.1156
99, 9,.",,2, ~~"O
"'.2500
93.5781
..
..
..
lQ.,296
69.0625
"9.,2500
999.2500
83..1281
..
..
..
17.8125
'3.0312
999.2500
",.JIOO
126.32P1
"'"
..
..
16.1625
74.1250
999.a1Oo
999.2500
105.4218
..
..
..
11.2734
59.6562
999.2500
9'ti.iieO
83.1250
-
..
..
16.5312
106.0625
999.3500
000 ..,~t\t\
..
... a.- .,. u
liP'1 J
NRAT
CALt
CALI
SFL.U
NPFlI
NRAI
CALI
CALI
SFLU
NPHI
NRAT
CALI
CALI
8FLU
NPHI
NRAf
CALI
CALI
SFLU
NPHI
NRAT
CAtJI
CALI
srt.u
lVPHI
NRAf
CALI
CALI
SF(¡U
NPtlI
"JÞAT
CA$..I
CArlI
SP'LU
NPHI
NaAf
CALI
CAL,I
SFLU
NPHI.
NRAT
" CA ¡.¡
CALI
SFLU
NPrfI
NRAT
~J\T.T
..
",-y.yy"""'
216162
999:2500
12.4340
999.2500
.-.,
..
..
84.0000
20.7548
999.250Q
13.6616
999.2500
..
..
100.5000
23.0263
999.2500
12.5073
999.2500
..
..
56.2500
23.0371
999.2500
13.9736
999.2500
..
..
21.5468
30.5820
999.2500
17.5605
999.2500
..
..
62.2500
20.9511
999.2500
15.2832
999.2500
.
..
33.3125
38.8378
999.2500
13.7381
999.2500
..
..
52.6250
29.0253
999.2500
13.6269
999.2500
..
..
45.5625
20.5312
999.2500
15.7797
999.2500
..
..
79.1250
20.9963
999.2500
1... ""11;.0
OEPT
ILM
RHOB
rCNt..
GR
GR
DEPT
ILM
RHOa
FCNL
GR
GR
DE:PT
ILM
HHOB
rCNL
GR
GR
DEfT
ILM
RHoa
f'C N L
GR
GR
DEP,£
ILM
RHOB
rcNt
GR
GR
DEPT
ILM
RHOB
fi'CNL
GR
GR
DEPT
ILM
RHOB
PCNL
GR
GR
DEPT
!lJM
RHOS
FC N (J
GR
GR
() r;Pl'
ItM
RHO8
~NL
,.,~
DEf?T
ILM
-... """"-""~
..
4400.0000
58.2500
2.5330
999.2500
64.2500
57.0019
4300.0000
62.5000
2.4962'
999.2500
61.4862
62.9804
4200.0000
75.)150
2.4857
999.2500
54.9t.B7
45.5058
4100.0000
34.0000
2.3'31
999.2500
50.0312
44.3867
4000.0000
2000.0000
2.1262
1471.0000
34.5625
30.8198
3900.0000
824.5000
2.3417
828.5000
72.7500
71.0625
3800.0000
53.6562
2.5117
1081.0000
55.0937
70.J750
3700.0000
70.6250
2.4'41
1329.0000
71.0625
95.3125
3bOO.OOOO
41.5000
2.4921
'75.0000
72.9375
&5.0000
3500.0000
10A_7'ìoO
..
..
..
SP
ILO
DR~O
ICNt:,
DT
Sf
ILD
DRHO
NCNIJ
IT
SP
ILl>
DRHn
ICHL
DT
SP
II-If)
DRAa
NCNfJ
DT
SP
ILD
DRHO
ICNL
DT
Sf
ILO
DRHO
NCNIJ
DT
SP
ILÐ
DRHO
NCIIl
DT
S,P
Ito
DRMO
NCNf,
Df
SP
11.8
DRHn
NCNL
OT
SP
TI.n
..
8.8046
94.8JIS
999.2500
999.2500
79.7343
-
..
..
It.lill
80.1250
'99.2500
999.2500
18.4218
..
-
-
12.1796
104.'81'5
999.2500
9'9.1100
82.2656
-
-
..
9.5146
36.4375
999.1100
999.2500
13.2181
..
-
18.6250
2000.00GO
0.0966
36.6.0000
25.0976
..
10.B984
108.8125
0.004S
2724.0000
99.4687
11.2579
143.t25()
0.0590
2J70.0000
87.3437
..
3.890&
102.6875
0.0004
3354.ooon
92.0312
..
-
16.8906
101.2500
0.0000
21" -- 0 ()QJ)
85.5Y""'"
..
27.4315
i';_A7c:;n
SFLU
NPIl
NRAT
CA(.,I
CALI
SF{,tf
NPHJ:
NRAT
CALI
CALI
SFLLJ
NPHI
NRAT
C, AtJl
CALI
SFlsU
NPHI
NRAT
CALI
CALI
SFLU
NPHI
NRÞtT
tAL,!
CALI
SFLU
NPHI
NRAT
CALI
CALI
SFLU
NPHI
t'JRAT
CAI"I
CALI
SFLU
NPHI
NRAf
CAllI
CALI
SFl..lU
, tiPMI"
NRAT
C~f.,l
CALI
5FLU
;\Jp¡.¡r
-
95.8125
18.4746
999.2500
15,.7124
999.2500
-
..
72.1250
21.3320
'99.2500
18.2961
999.2500
..
..
76.1250
22.7548
999.2500
14.6533
999.2500
..
-
26.9375
30.9228
999.2500
19.4023
999.2500
..
.
0.1499
49.9140
2.3554
11.7006
999.2500
..
162.2500
30.9082
3.0253
12.4609
999.2500
-
183.7500
20.0195
2.3164
12.9843
999.2500
..
116.8125
20.6542
2.3847
14.0000
999.2500
..
192.2500
21.9238
2.4296
912.5156
99.2500
~
291.5000
'~_A"R1
f '"' \" u
GR
~
OEPT
ILM
RHOB
FCNL
GR
GR
DEPT
Il"fIII
RHOB
FCNL
GR
GR
DEPT
ILM
RHOB
rCNL
GR
GR
DEfT
ILM
RHOB
FCNL
GR
GR
DEfT
IbM
RHOB
rCNL
GR
GR
DEPT
It,M
RHOa
FCNL
GR
GR
Dr.:Pl'
ILM
RHO8
¡rCNt.
GR
GR
OEP1'
lLM
RHOa
FCN 1,1
GR
GR
o£PT
ItM
RHOB
FCNL
GR
GR
""V~Q.;;lVVV
72.'31S
82.3750
3400.0000
41.3125
2.4589
848.0000
59.9315
72.9315
3300.0QOO
54.3750
2.4570
743.0000
65.6875
76.0000
3200.0000
47.2191
2.4375
597.50QO
56.0625
63.3125
3100.0000
33.0312
2.3808
690.0000
54.4375
68.3750
3000.0000
38.9687
2.4550
889.5000
57.1500
10.0000
2900.0000
63.5937
2.4511
1254.0000
68.9375
77.2500
2800.0000
33.0)12
2.4042
620.0000
54.3431
b4.2500
2700.0000
37.5312
2.4414
BOO.SOOn
56.812$
64.1875
2600.0000
69.4375
2.5019
919.0000
59.9062
72.3125
",,-!"II'
IT
SF
ILP
DRHO
N C"N 11
DT
SP
ILO
DRHO
NCNI..
01:
SP
IL,{)
DRHn
"CNll
DT
SP
ILP
DRHO
NCN[J
01
Sf>
1110
DRHO
NCNb
DT
liP
ILP
DRtiO
N C N fJ
DT
SP
ILl>
DRAO
NCfIf IJ
DT
Sf
ILO
ORIofO
N C tH.
DT
SP
IiJ [>
DRHO
NCNl..
OT
"0408VV\."'"
'5.6'1.1
,,-....
16.0625
58.7181
.0332
244'.0000
106.57~1
-
21.&781
135.7500
Q .dH~l 4
2078.0000
94.9218
10.4687
, 1 .'8 'tø
0.380
1924.°'00
95.4218
5.1445
55 .,1. 56" 2,'
O.()49¡
1941.0000
115.2343
13.6953
5Q.J112
O.O27A
2518.°'°0 '
99.()7S,
10.8159
107.8125
0.0058
3160.0000
105.1093
16.5625
4).1112
O.O44Q
1942.00qO
91.18 5
5.5390
63.3750
0.0283
2246.00nh
'6.5312
-
11.3828
'a.6250
0.0053
22)2.t()()O
303.9437
-
""nlof'"
CALI
SFLU
NPHI
NRAT
CALl
CALI
SrL.U
NPAI
"RA!
CALI
CALI
SFLO
NPHI
NRAT
C1\ûl
CALI
SF(;U
~JPRI
NRAt'
CALI
CAúl
SFLU
NPHI
T\fRAT
CALI
CALI
Sf'LU
NÞHI
NRAT
C~LI
CALI
SF'LU
NPHI
NRAT
CALI
CALI
Sf'LU
NPHI
NRAf
CALI
CALI
stLU
NPMI
NRAT
CALI
CAt,I
..".,..,...,,-
. '99.25'00
--...
60.68'5
24.8046
2.7031
15 6562
- 999:2500
2~3.12S0
5.3906
2.7167
14.6953
- 999.2500
73.5625
28.7109
2.9902
~6.5781
- 9 9.2500
65.4375
24.7558
2.7246
16.6093
. 999.2500
45.9687
23.4863
2.6464
16 7343
.. 999:2500
150.6250
19.4824
2.3769
16.7031
.. 999.2500
55.0931
30.1751
3.0911
16.7343
- 999.2500
58.1562
23.6328
2.6542
16.7187
. 999.2500
131.5000
20.70~1
2.45 0
16.7031
- 999.2500
.,J,.U"'I
RHGa
FCNL
Gß
GR
DE;pr
IJJM
RHOB
FCNL
GR
GR
DEPT
I (.J t-¡
RHOa
FCNL
GR
GR
DEPT
ILM
RHOt:)
rCNL
GR
GR
DEPT
IL'-'
RHOS
FCNL
GR
GR
Ot;PT
ILM
RHUB
rCNt.
GR
GR
DEPT
ILM
RHOB
FCNL
GR
GR
'-1~.\t,,'lj,'
2 .4¡J:I¡9'
750.0000
49.5625
62.0000
2400.0QOO
75.1250
2.3398
503.5010
49.2187
73.4375
2300.0000
3B.7812
2.4Q42
bO5.0000
53.8437
66.4375
220Q.OOOO
107.3160
2.4433
937.5000
57.3125
73.562,5
2100.0000
58.2187
2.4316
728.5000
52.1250
09.6250
2000.0000
45.6562
2.4453
545.0000
48.4687
64.5625
t9f}().0000
54.0000
2.4023
792.5000
51.7187
68.5625
DEPr
111M
RHOB
FCNù
GR
GR
DEPT
ILM
RHOB
fCN (J
GR
GR
,..........~ P T
..LlM
RHOB
FCNt..
r"n
1800.0000
119.8125
2.4296
949.0000
61.4062
85.)125
1700.0000
62.1562
2.4960
816.0000
11.0112
67.2500
1600.0000
43.9375
2.0937
524.000.
&:.'"' '"'04'"'
j¡, J.¡ t'
dAMe "
N C N fJ
DT
SP
ILO
DRHO
NCNl"
DT
SP
IL()
DRHO
NCNfl
DT
SP
ILl)
DRAa
ICNt.
DT
SP
ILl'
DIMe
NCNI.J
DT
SP
ILO
ORHO
NC þJ le,
DT
iP
ILO
ORNO
NCNfJ
DT
SP
ILD
DRHO
NCNIJ
OT
SP
ILO
DRH0
NCNIJ
DT
SP
ItO
DRAO
MCNta
r\"1"
;,;}ì,.J Qi~
',', "',', <T,."",',f',',.,.,' ,.."'.'..'.,.,,'1,,"".""'..'.'..,.,u,'."",',.,."',',.",,.,."."'""""""",',1',',,,,',\,'
',., ""
8' "",'
2160.0000
95.1211
-
6.32B1
89. t ¡,a,
0.0004
19'8.0000
121.2812
-
23."'2
50.9062
O.~t44
1621.0000
99.5312
..
0.5000
'5.,111.0
0.0053
2554.0000 '
142.7sno
..
24.2"8
b7.9315
0.0385
2252.0000
143.1250
10.9765
115.5'25
O.O43Q
11)5.0000
124.6250
20.7031
81.2500
0.0424
2394.0000
121.1815
....
17.0625
t3."'~
0.0048
25i2.ØOØO
151.2031
..
15.'311
133.2500
0.9058
2350,0000
114.'5)1
30.7~
b4.18.....J
O.12J;O
11 S1.()OlU)
tr)s::. ~1"'C:
l'IIr n.&.
II..'"
CALI
CA~I,
SFLU
NP HI,
NRAT
CALI
CALI
SP'LU
NPHI
NRAf
CALI
CAI,¡ I
SF{/U
NPHI
NRAT
CALI,
CALI
SfLU
NÞHI
RitA!
CALI
CALI
SFLU
NPKI
NRAT
CALI
CALI
SFLU
NPHI
f'4RAT
CALI
CALI
S~"LU
NPffI
"~RAT
CALI
CALI
st'LU
NPHI
NRAT
CALI
CAL.I
SFLU
, NPMI
r-JRAT
CALI
r1\f.T
£.;l.UJ£U
l'l": ,~:,
.. 999.2500
110.6250
36.2304
3.3906
15.0390
- 999.2500
41.0000
35.0097
3 369~
16:734
.. 999.2500
131.5000
24.0722
2.6328
14.7656
.. 999.2500
82.2500
28.9550
3.0000
16.4062
.. 999.2500
135.8750
29.2968
2.9980
IS.S000
.. 999.2500
13.5625
21.9785
2.9355
16.3593
.. 999.2500
192.2500
23.7304
2.5820
13.7031
.. 999.2500
145.3150
25.1464
2.6640
13.2500
.. 999.2500
79.1250 .......
32.9589
3.2500
15.6640
- QQQ ">t::.nn
~
DEPT
~.M
lOB
fCNL
GR
GR
DEPT
tvM
RHOB
rCNt..
GH
GR
DEPT
ILM
RHoa
fCNL
GR
GR
DEPT
lLM
RHoa
rcNt
GR
GR
OEPT
I [M
RHOB
FCNL
GR
GR
OEPT
ILM
RHOB
rCNL
GR
GR
DEPT
lLM
RHOB
FCAIL
GR
GR
f)~:PT
lLM
RHOB
rcNt
GR
GR
OEPT
lLM
RHOS
rCNL
Gø
GR
oe;PT
I ~ !'L,
..
1501.0"°
30.4687
2.2949
366.5000
58.3125
73.6875
1400.0000
67.1175
2.1738
344.7100
52.8125
66.5000
1300.00QO
61.2197
2 0019
338:7500
JO.1.250
59.0625
1200.0000
40 5000
1:916g
393.0001)
51.6875
60.1115
1100.0000
54.3750
2.()QJ9
661.5000
58.40.2
71.5625
1000.0000
38.062,5
2.2773
378.SQOO
45.1875
60.90i2
900.0000
76.2500
9".2100
999.2500
999.2100
999.2500
800.0000
79.1875
999.2500
999.!500
999.2500
999.2500
700.0000
153.7500
99'.2500
999.2500
9" .2,500
999.2500
bOO.OOOo
,,!~.JlI2
...
..
...
..
...
..
-
..
...
..
..
IP
ILO
OAHU
WCNt,
DT
SP
ILD
t)RHn
MCN (,#
OT
IF
ILJ)
DRHO
NCNJ,
01'
SP
ILP
DRFH1
NCNL
DT
SF
ILO
iRHO
fJCNII
01'
SP
l,liD
DRHn
NCNll
DT
if
ILl>
IJRHO
NCNI,
tJT
SP
ILl>
DRAD
NCN1J
DT
SP
IL£1
DR tu~
NCNfJ
tlT
gp
IJ.¡[)
........... ....
It, ..1";)1
47:0Ql'"".,
0.04
1483.0006
108.5312
39.4062
59..17'10
0.°327
14';0,. tOIO
131.1562
3.2.',.87 '
81.5625
0 '" () 18 8 "
..
1364.0000
155.t931
34.6875
58..21,00
0.0981
1"7.0000 "
110.545R
29.4'15
62.1250
0.061$
2036.0000
153.]5'1
46.8437
48.1,312
O~1347
14&3.0000
140.1562
..
5.~.711'
Bo.5625
It9.i'D'
999.2500
999.2500
..
..
-
-
64.7500
10s.i7se
999.2500
"t.2$00
999.2500
..
..
-
-
81.2500
167.2500
tt~.~lot
999.2500
999.1$00
;eo
...
..
-
98.5000
Å!~.4~22
SF..
NPHI
NAAf
CALI
C A 1",1
40.5931
44.1894 .-......
3.8750
16.5937
- 999.2500
44.9687
41.0156
3.6503
14.7109
... 999.2500
62.5000
44.1894
3.8808
16.8125
- 999.2500
40.5937
41.6503
3.7382
16 8125
- 999:2500
58.9681
30.0781
2 9882
13:1562
. 999.2500
35.4062
43.~O58
3.417
16.81~5
.. 999.2500
52.3~31
- 999.2 00
- 9~9.2500
- 9 9.2500
- 999.2500
49.2187
... 999.2500
- 999.2500
- 999.2500
- 999.2500
~14.2500
- 99.2500
- 939.2500
- 9 9.2500
- 999.2500
209.7500
.. 999.2500
GOt') "'r:tnn
sptu
N,PHI
NRAT
CALI
CALI
srLU
NÞHI
NRA~
CALI
CALI
SFLU
NPHI,
NRAT
CAI.tJ
CALI
s,r ls U
NPHI
N~AI'
CALI
CAlJl
SFLU
NPHl~
NRJ.\T
CAúl
CALI
SfLtU
NPHI
"RAT
CALI
CALI
SFIIU
NPMI
NRAT
CALI
CAL!
Sf'LU
NPHI
HRAI
CALI
CALI
SFLU
NPtil
un....
~
'" ,['\
GJ
DEPT
ILf4I
RHOB
rCNL
GR
GR
OEP1'
ILM
RHOß
FCNL
GR
GR
DEfT
If.JM
RHOB
rCNt,
GR
GR
DEPT
ILaM
RHUB
rCNL
GR
GR
OEPT
ILM
RHOa
FCNL
GR
GR
OEPT
ILM
RHOB
rCNlt
GR
GR
..
~,2 ~ .",(,¡;;z YM
99'.2510
500.0000
62.0Q25
9it.21GO
999.2~Qo
999.2100
99Q.2500
400.0000
47.7112
999.2500
999.2100
999.2500
999.2500
300.0000
56.9375
999.2500
999.2500
99'.2100
999.2500
200.0000
49.1875
999.2500
999.2500
999.2500
999.2500
tOo.OOOO
2000.0000
999.2500
999.2500
999.2500
999.2500
84.0000
2000.0000
999.2500
999.2500
999.2500
999.2500
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
-
..
..
..
FILE NAME :EDXT .001
SERVICE NAME:
vEf\SION #I :
DATE:
~AXIMUM LgNGTH : 1024
FILE TYPE:
'IEXT FILE: NAMr: :
,,-..
V,l.
IP
ILO
DIMa
NCNf.
DT
SP
ILD
DRHO
NCNI)
DT
SF
ILO
IIHO
NCNIJ
1)'1'
SP
¡to
DRHO
N CN r,
DT
if
IL£)
DAMn
NCNI"
DT
SP
ILV
DR He)
fiCNt
D1
?,'?"'l .~ £,? u "
..
,'.baID
81.5000
,,'.2500
999.2500
'9'.2100
..
..
..
..
123.6250
lJO.1250
999.2500
9'9..5,°,. "
999.2500
..
..
..
..
'..1100
108.6815
"9.ltG,
999.2500
999.2'00
..
..
..
..
123.8750
22..0000
999.2500
999.2500
999.2500
..
..
..
..
36.2500
5.1640
9'9.~5GO
999.2500
999.2500
..
..
..
19.2500
2600.0000
999.2500
t99.2~O()
999.2500
..
..
..
FI [*1'. TRA I LER
********** Eor **********
~
\., ,., 4;.1,
¡FLU
NPHI
.,RAt
CALI
CALI
SfLlJ
PIPH];
NRAT
CAJ",l
CALI
SFLU
NPHI
NRA!
CÄLI
CAúI
SF1JU
IPll
NRAT
CAL!
CALI
5"LU
NPHI
NRA!
CALI
CALI
SFLU
tlPHI
NRAT
CAùI
CALI
7;¡fif.c.JVV
86.4375
.. 999.2500
.. '~9.2500
"" 9 9.2500
.. 999.2500
67.8750
.. '99.~500
.. 999. 500
- '99.~500
.. 999.500
49.2187
.. 999.2500
.. 939.2500
.. 9 9.2500
.. 999.2500
94.3750
.. '99.2500
.. 999.2500
.. 999.2500
.. 999.2500
1.930&
.. 999.2500
.. 9~9.2S00
.. 9 9.2500
.. 999.2500
2.0273
.. 999.~500
- 999.500
. 999.2500
- 999.2500
........
.
~
,
1AP,"~ TRAILER
seRVICE NAME, : EDIT
DATE :B1/01/1&
ORIGIN :HAM!
rAPE NAME :61301
CONTINUATION # :01
NEXT TAPE NAME:
COMMENTS :TAPt COMMENTS
IS~Eiif 'IRAILER
:EJ11T
SERVICE NAME
DATE 181/01/16
ORIGIN:
RÆEL NAME :R.M.D.Q.
CJNTINUATION. :01
NEXT REEL. NA~E :
COMMENTS :TAPE DENSITY
»»»>800 ePI'fc«<~
"
********** €OF **********
********** ~OF **********
'"
,..-......
~
" "