Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout200-208-zj0 20( f
32000
kip Date: 11/18/2019
Transmittal Number: 93714
BPXA WELL DATA TRANSMITTAL
Enclosed is a disc with the requested core photos and analysis.
If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendallgbp com.
API_WeliNd
Wi_Permit
Well Nm
Core
Photos
Core Analysis,
Description, etc
0029229780000
[50029229950000
2001620
PRUDHOE BAY UN BORE Z-101
0029229880000
2001960
PRUDHOE BAY UN AURO 5-104
J
2002080
PRUDHOE BAY UNIT Z-39
50029230080000
2010590
PRUDHOE BAY UN BORE V-100
50029231610000
2031030
PRUDHOE BAY UN BORE V-111
J
50029233880000
2080530
PRUDHOE BAY UN ORIN L-205
L-205PB1*
*Plug -back analysis located in BP archive database.
Please sign and email a copy of this transmittal to. GANCPDCAbp365.onmicrosoft com
Thank you,
Mer
.Merton XendafC
SIM Specialist
SIM
BP Exploration AlaskaJ900 E. Benson B1vd.lRoom: 716BIAnchorage, AK
Subsurface Information Management
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
,SAN 3 0 2020
11
pp
A0GC..s o
· ,
) STATE OF ALASKA ')
ALASKA OIL AND GAS CONSERVATION COMMI~SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
RECEIVED
APR 2 7 2005
Zero Other
5. Date Comp., Susp., or Aband.
2/19/2005
6. Date Spudded
02/25/2002
7. Date T.D. Reached
03/15/2002
8. KB Elevation (ft):
86.04'
9. Plug Back Depth (MD+TVD)
9612 + 9129
10. Total Depth (MD+ TVD)
9700 + 9216
11. Depth where SSSV set
NIA MD
19. Water depth, if offshore
NIA MSL
Alaska Oil & Gas Cons. Commission
1 b. Well ClassAnchorage
IBI Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
200·208 304-400
13. API Number
50- 029-22995-00-00
14. Well Name and Number:
PBU Z-39
15. Field 1 Pool(s):
Prudhoe Bay Field 1 Prudhoe Bay
Pool
1a. Well Status: 0 Oil 0 Gas 0 Plugged IBI Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
RES 1 AIT, DT 1 BHC, CNL, LDL, GR, Caliper, SP, MRES, MWD, DGR 1 EWR, CMR, MDT
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE
I OP tiOTTOM 'lOP tiOTTÒM SIZE
Surface 113' Surface 113' 30"
34' 3023' 34' 2959' 12-1/4"
32' 9273' 32' 8793' 8-314"
9070' 9700' 8592' 9216' 6-1/8"
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
4300' NSL, 3237' WEL, SEC. 19, T11 N, R12E, UM
Top of Productive Horizon:
3097' NSL, 1025' WEL, SEC. 19, T11N, R12E, UM
Total Depth:
3076' NSL, 993' WEL, SEC. 19, T11 N, R12E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 599440 y- 5959099 __ Zone- _~S~~____
TPI: x- 601673 y- 5957927 Zone- ASP4
Total Depth: x- 601705 y- 5957906 Zone- ASP4
~._------------_.__._. ..---.-----------------. -------------------
18. Directional Survey 0 Yes IBI No
22.
CASING
SIZE
WT. PER FT.
91.5#
40#
26#
12.6#
GRADE
H-40
L-80
L-80
13Cr
20"
9-5/8"
7"
4-1/2"
23. Perforations oRen to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
None
MD TVD MD
SCANNED MAY 11 2005
26.
Date First Production:
Not on Production
Date of Test Hours Tested
Ft
Ft
16. Property Designation:
ADL 028262
17. Land Use Permit:
20. Thickness of Permafrost
1900' (Approx.)
CEMENTING RECORD
260 sx Arctic Set (Approx.)
679 sx Arcticset Lite III, 221 sx 'G'
351sx LiteCrete, 100 sx Class 'G'
78 sx Class 'G'
AMOUNT
PULLED
24.
TUBING RECORD
DEPTH SET (MD)
9075'
PACKER SET (MD)
9017'
SIZE
3-1/2",9.3#, L-80
TVD
25. ACID, FRACTURE, CEMENT S~UEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9283' Set Whipstock
9283' P&A with 11 Bbls of Cement
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
OIL-BsL
PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED + OIL -BSL
Press. 24-HoUR RATE
27.
GAs-McF
CHOKE SIZE
W ATER-BSL
GAS-OIL RATIO
GAs-McF
W ATER-BsL
OIL GRAVITY-API (CORR)
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None
Form 10-407 Revised 12/2003
RBDMS BFL MAYO 3 2005
·'i I ...~ 1 ! "'\ :
I, I' \''''\1;
: \, i \)!
, \
.\ ,
G, 1'/
'(1\/ R,~(...."\ . :
t 1" !" ....J. j
"",, # 1
CONTINUED ON REVERSE SIDE
':!...'¡;''\n.\ .r-. .....
r", ~:,
28. , )
GEOLOGIC MARKERS
NAME MD
Top of Sag River 9230'
Shublik A 9269'
Shublik B 9328'
Shublik C 9358'
Shublik D 9379'
Ivishak 9418'
Zone 4A 9474'
41N 9518'
OWC 9543'
Zone 3 9572'
29.
)
":ORMATION TESTS
Include and briefly summarize test results. List intervals tested,
TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
8750' None
8789'
8847'
RECEIVED
APR 27 2005
Alaska Oil 8& Gas Coni. Commission
Anchorage
8877'
8898'
8937'
8992'
9036'
9060'
9089'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~^^, IJ IJ L ILP_ Ttl T h I A t t D t Dill" '-r{OI ~
Terrie Hubble ~ 11') V ~ K \(.Ä1\J\.f i e ec nica ssis an a e , ^" I ~
PBU Z -39 200-208 304-400 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number P . N 1 N Drilling Engineer: Sean McLaughlin, 564-4387
ermlt o. Approval o.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 21: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 1 0-407 Revised 12/2003
":r
Submit Original Only
)
)
Well:
Field:
API:
Permit:
Z -39A
Prudhoe Bay Unit
50-029-22995-01-00
204-224
Accept:
Spud:
Release:
Rig:
03/20/05
03/22/05
03/31/05
Nordic #2
PRE-RIG WORK
11/30/04
DRIFT WI 17' * 2.72 DUMMY WHIPSTOCK, S-BAILER TAG BOTTOM AT 9957' SLM (TARGET DEPTH 9283').
RECOVERED SAMPLE OF FRAC SAND.
12/01/04
PDS CALIPER FROM 9370' TO SURFACE.
12/03/04
SET 3112 WHIDDEN CATCHER AT 9035' (SLM). PULLED LIVE VALVES FROM STA'S # 6,5,4 AND 3 AND
SET DUMMYS.
12/04/04
SET 1 1/2 RK, DUMMY GAS LIFT AT 6914' (SLM) IN STA.3. MIT IA PASSED. LRS PUMPED TOTAL BBL OF
CRUDE = 135 BBLS.
12/14/04
SET 4-112" X 3-1/2" BAKER GEN II WHIPSTOCK (TOP) AT 9283',26.5 DEG ROHS. PIP TAG WAS SET 7.34'
BELOW TOP OF WHIPSTOCK AT 9290.4'.
02/19/05
DEPRESSURE lA/FLUID PACK WI DIESEL. RIH WI 2.25" BDN. LIGHTLY TAG WHIPSTOCK. FLAG CT 30'
ABOVE WHIPSTOCK. CIRC KILL FROM FLAG. PUMP 60 BBLS OF DIESEL DOWN BACKSIDE FOR NON-
FREEZABLE FLUIDS TO CIRC. PUMP 11 BBLS OF CEMENT. BUMP AT 2.2 BBLS. LAY IN 1 :1. 1.5 BBLS
LOST. 3.7 BBLS BEHIND PIPE. PARK AT SAFETY HOLDING +500 PSI. WASH OUT TO 9253'. POOH AT
80%, REPEAT PASSES ACROSS ALL JEWELRY. RETURNS 1 TO 1. FREEZE PROTECT COIL AND WELL TO
2500'. RDMO. ESTIMATED TOC AT 9253'.
, . I'
02/23/05
DRIFT TUBING W/2.50 CENT AND SB. SO AT 9241' SLM, SAT DOWN ON CEMENT PLUG. SAMPLE BAILER
CAME BACK EMPTY. PRESSURE TESTED PLUG TO 1500 PSI.
RECEIVED
APR 2 7 Z005
Alaska Oil & Gas Cons. Commission
Anchorage
I' f
!
)
)
BPEXPLORATION
Operations$u I11maryReþort
REC·E·,vee.',1"'.
APR2:7·Z005
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Z-39
Z-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Date
From -To Hours Task Code NPT Phase
3/19/2005
04:00 - 05:00 1.00 MOB P
05:00 - 11 :30 6.50 MOB P
11 :30 - 18:00 6.50 MOB P
PRE
PRE
PRE
18:00 - 00:00 6.00 MOB P
3/20/2005 00:00 - 03: 15 3.25 MOB P
03: 15 - 06:00 2.75 MOB P
06:00 - 08:00 2.00 MOB P
08:00 - 21 :00 13.00 MOB P
21:00 - 21:15 0.25 MOB P
21:15-22:00 0.75 MOB P
22:00 - 00:00 2.00 BOPSUF- P
3/21/2005 00:00 - 03:30 3.50 BOPSUR P
03:30 - 07:30 4.00 BOPSUP P
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
PRE
07:30 - 08:30 1.00 RIGU P PRE
08:30 - 09:15 0.75 RIGU P PRE
09:15 -11:30 2.25 RIGU P PRE
11:30-14:15 2.75 RIGU P PRE
14:15 - 16:0.0 1.75 RIGU N SFAL PRE
16:00 - 17:15 1.25 STWHIP P WEXIT
17:15 - 18:45 1.50 STWHIP P WEXIT
18:45 - 20:00 1.25 STWHIP P WEXIT
20:00 - 21:40 1.67 STWHIP P WEXIT
21 :40 - 00:00 2.33 STWHIP P WEXIT
3/22/2005 00:00 - 02:30 2.50 STWHIP P WEXIT
Start:
Rig Release:
Rig Number: 2
Alaska Oil & Gas Cons. Commission
Sp udJ!lné1\titáìifO/2002
End:
3/19/2005
Description.··øf"·()përªtiön~
Make ready to move of End 4-02
Move rig off well, lower reel onto trailer, lower derrick
Contaced SDI Pad Op and conducted pad walk through and
completed Pad Inspection
Move rig camps to OS7 and spotted
Rig left SDI at 1130 hrs via ice road and Endicott Road
Crew change at 1800 hrs on Endicott road
Continue MOB to Veco yard. Stand-by there and raise derrick.
Waiting for Doyon 16 to complete their move to DS #11 before
proceeding with our move.
Raised derrick at Veco Yard while waiting for Doyon 16 to finish
thier move to DS #11
Continue move to 2-39. Passed West gate at 0500hrs
Continue move to 2-39. Passed Oxbow/Spine at 0800hrs.
Moving at 1.6 mph average
Continue move to 2-39. Passing by W-Pad exit Spent 2 hrs at
Kuparuk Bridge while tool service layed 100 rig mats. On 2
PAd at 2030hrs. Spot rig close to well.
Toolbox safety meeting. Discuss pulling over well.
Pull over 2-39. Rig accepted at 2200 hrs 3-20-05
NU 7-1/16" 5k BOP's. Take on 290 bbls 1% KCL w/2# bio.
Continue NU 7-1/16" BOP's. Same time hook-up all CT inner
reel plumbing and electrical.
Pressure test BOP's. AOGCC wavied witnessing test. Body
test found leak in kill line. Tighten. Restest good. Test all
componets to 250psi low/5min 3500psi high 5/min (annular
2500psi).
RU to pull coil across. Stab inject on stuffing box.
PJSM on pulling CT across pipe shed
Pre Spud Meeting with Crew and Pad Operator. Coverd well
operations and Hazards associated with working on 2-Pad
Pulling CT across with hydraulic winch.
Working on bulkhead on reel. Pump fluid for coiled tubing slack
management
Cut off 100 ft CT to find wire. Installed dimple CTC and pull
tested to 35k
Unable to Cir CT. BHllost high voltage supply and went to
Oeadhorse to PU another one. Rehead to BHllnstalled 2.35"
Nozzle.
Open well, WHP = Opsi. Stab on well
RIH steaming CT to un-thaw and re-gain circulation.
RIH to 100 ft regain circulation. While waiting on BHI power
supply, RIH to 2,500 ft and circulated out MEOH. POOH.
PU BHI/BOT BHA Mega line and installed wet connect, stab on
toCT
RIH tagged cement at uncorrected deph of 9286'.
Pull up to 9090' bit depth. Log CCL from 9000' to 9100'. Correct
-19' RIH tagged TOC at 9268' paint flag
Drill cement f/9268' to 9285'. Free-spin 1.6bpm 2400psi
3-400psi MW 2k wob 15-20'lhr
Start time drilling window. 1.6bpm 2600FS 3-400psi MW 2.6k
wob
Continue milling window f/ 9287' 1.6bpm 300-500psi mw
Printed: 4/4/2005 8:29:44 AM
," ~
I
)
\.Î,..,f
)
SPEXF?L0RATION
O.pe"at~i.Q.rls..,.·.S.I.1"I11.'.m.a...y..,·Rc:!.pø...t
RECEIVf:Ëi)2_
APR2 7 2005
stalled at 9290.7' pick-up went back through without problems.
Drilled formation to 9292.6'.
Ream window area. TOW 9285' BOW 9290.7'
Start swap to new 8.4ppg Flo-Pro wI 8#ppb KlaGard 3#ppb
LubeTex at 0330hrs
Drill formation fl 9292.6' to 9300.4'
Ream window area. Run through area wo pump. Looks good.
Paint white flag at 9185' EOP. TOH
UD BHA #1. P/U BHA #2 surface test tools.
RIH
Correct to flag -18'. Tie-in +3'
Directional drill ahead fl 9300' 1.7bpm 3000psi FS. Drilled to
9328' then lost partial returns slowly healed up to > 1 bpm los
Lost all returns at 9391'.
Wiper to window.
Drill ahead f/9391' @ 1.7bpm in 0.16bpm out a
increasing.
Drilling fl 9415' 1.7bpm in .35bpm out (9425'
.48 returns)
Wiper back through loss zone.
Drilling ahead 1.75 in 0.61 out
Drilling ahead. ROP 130 fph. =45L. Inc=33 deg. Drilling at
1.7010.65/3420 psi. 411 bb in the pits. Losing about 1
bbl/min in mud. More ¡j on the way.
9536', About 150' si e we lost returns. Currently drilling at
1.72/0.90/3370 p. '. Pit volume=327 bbls. Ordered an
additional 60 Is of mud. Doyon 15 was at J pad at 17: 15
tonight. It I be difficult to get mud around the rig. A total of
870 bb of mud has been ordered.
PROD1 305 Is of mud in the pits. 1 truck (290 bbls) of new mud on
ation. Losses have stabalized at 1.7010.8/3570 psi. Free
spin is 3000 psi at 1.70 bpm.
Land well at 9586' MD, 8934.7', right on plan. Inc=81 deg at
the bit. Pull out of hole for lateral section BHA. Last losses
while drilling were 1.7/0.83 bpm. Clean PU off bottom at 28
klbs. Pull in open hole pumping at full rate. Drop rate to 0.5
bpm thru the window. Open the EDC, and pump at full rate
while POOH.
PROD1 Tag up at surface. Stand back injector. Inspect motor. It
appears tight. Inspect bit. Graded 1,2 with no obvious wear on
the nose or wing cutters, and with 1 chipped backreaming
cutter. Will rerun bit. Adjust motor AKO to 1.1 deg. Test
MWD BHA electronically, passed ok.
PROD1 RIH with BHA #3 to begin drilling the lateral section of the hole.
PROD1 Continue to RIH with BHA #3 to begin drilling lateral section.
PROD1 Log tie in pass over RA tag, made +7' correction???? This did
not compare with correction from last run of -15'. Relog tie in
pass over a longer interval to confirm correction. Made a
second correction of -21', for an actual total correction of -14.
PROD1 Tag up at 9584', and begin drilling lateral section. Free spin
=2990 psi at 1.67 bpm. Drilling at 1.68/0.82/3150 psi. 414 bbls
of mud in the pits, 2 additional vac trucks on location. The
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Z-39
Z-39
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Date Frorn'To Hours ., Task Code NPT Phase
3/22/2005 00:00 - 02:30 2.50 STWHIP P WEXIT
02:30 - 03:50 1.33 STWHIP P WEXIT
03:50 - 05: 15 1.42 STWHIP P WEXIT
05: 15 - 05:25 0.17 STWHIP P WEXIT
05:25 . 07:00 1.58 STWHIP P WEXIT
07:00 . 09:00 2.00 DRILL P PROD1
09:00 . 10:30 1.50 DRILL P PROD1
10:30 . 10:45 0.25 DRILL P PROD1
10:45 - 14:45 4.00 DRILL P PROD1
14:45 - 14:55 0.17 DRILL P PROD1
14:55 - 15:45 0.83 DRILL P PROD1
15:45 - 16:30 0.75 DRILL P PROD1
16:30 - 16:35 0.08 DRILL P PROD1
16:35 - 17:00 0.42 DRILL P PROD1
17:00 - 18:30 1.50 DRILL P PROD1
18:30 - 19:00 0.50 DRILL P PROD1
19:00 - 19:30
0.50 DRILL P
19:30 - 21 :20
1.83 DRILL P
21 :20 - 22:30
1.17 DRILL
22:30 - 00:00
P
3/23/2005
0.33 DRILL P
1.08 DRILL P
0.92 DRILL P
Start:
Rig Release:
Rig Number: 2
Alaska Uìl & üas Gons. (;ommission
Spu~~m~U20/2002
End:
3/19/2005
DesÞriptionof Operations
Printed: 4/4/2005 8:29:44 AM
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker. doc
MICROFILMED
04/01/05
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
!,~'~"".
'~.~-::' \"'.
">"'-'I'~,~~,;......
. " j. \.,
.\;
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
D\tq
~~.. Well
'\ -¡- L5-05
¡a~..\5Y L3-02
I ~ '-... L3-02
~..~ ~_ L5-05
~..tLrftfl- DS 06-23B
.~~. rf6 ~~~~6A
rfJ'l-tJ~ W-17
¡. ~~ 02-29C
~ ~~f{y-~ X-04
t>'r..() \ W-31
\~?
Job #
10662986
10679068
10900108
10674383
10715411
10621750
10900123
10889187
10889185
10919925
10877807
~fJ'rr'~
~~'~~f:
NO. 3287
12/20/04
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Log Description
Color .~
Date Blueline Prints CD
01/28/04 1 1 / õ?"ð ""
04/03/04 1 1 I ??0-:JJ
10/29/04 1 1 18(;, -IS'
10/05/03 1 1 (67 -(J(ðj
06/15/04 1 1 20'(.. tin
12/01/03 1 17-' -/3R
11/27/04 1 .2.-9() ... zdff
11/08/04 1 I ~ ~9S"
11/07/04 1 2. o'I-OSI
12/15/04 1 /7?-O1??"
12/15/04 1 /~/Y1
RST-SIGMA
RST -SIGMA
RST -SIGMA
RST-SIGMA
MCNL
SCMT
PROD PROF WIDEFT
TEMPERATURE PROFILE
DOWN HOLE SAMPLE LOG
PROD PROF W/DEFT
PROD PROF WIDEFT/GHOST
'--"
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. S'""'C~' [. N- "N" Er";: n PR "';
Petrotechnical Data Center LR2-1 r.,~ A-,!! - ~J It." 1..
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
8 2005
Alaska Data & Consulting Services
2525 Gambell Street. Suite 400
Anchorage. 99503-2
ATTN' eth
~~~
)
~7~j! :} ~1!Æ~~«!Æ
AI~ASKA. OIL AND GAS
CONSERVATION COltDlISSION /
Sean McLaughlin
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: Prudhoe Bay Z-39
Sundry Number: 304-400
Dear Mr. McLaughlin:
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7fH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
a()~fi¡llð!>i6
Enclosed is the approved Application for Sundry Approval relating to the above-
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this decision,
or such further time as the Commission grants for good cause shown, a person
affected by it may file with the Commission an application for rehearing. A
request for rehearing is considered timely if it is received by 4:30 PM on the 23rd
day following the date of this letter, or the next working day if the 23rd day falls
on a holiday or weekend. A person may not appeal a Commission decision to
Superior Court unless rehearing has been requested.
BY ORDER OF J'1jt COMMISSION
DATED this~ day of November, 2004
Enc!.
SCANNED NOV 0 5 20D4
~J 4 A- I q~ lz..oo4
) STATE OF ALASKA O)S (f / tf/r:- I
ALASKA OIL AND GAS CONSERVATION COMMISSION NOV 0 3 2004
APPLICATION FOR SUNDRY APPROVAL .
20 AAC 25.280
1. Type of Request:
II Abandon 0 Repair Well 0 Plug Perforations 0 Stimulate
0 Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver
0 Change Approved Program 0 Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well
0 Other
0 Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
7. KB Elevation (ft): 86.04'
4. Current Well Class:
IBI Development 0 Exploratory
0 Stratigraphic 0 Service
5. Permit To Drill Number
200-208 /
6. API Number: /
50- 029-22995-00-00
9. Well Name and Number:
PBU Z-39 /
8. Property Designation:
ADL 028262
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
'..e~ES,E;tit'VV:t;,lC¡ØÇ)N[)IJIPN,$~MMh\~¥, .. ,". .
Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured):
9612 9129 None
11. '
Total Depth MD (ft):
9700
C~$ing
Structural
Conductor
Surface
Intermediate
Production
Liner
Total Depth TVD (ft):
9216
Lehg~h
Junk (measured):
None
(Dóllapše
630'
20" 113' 113' 1490 470
9-5/8" 3023' 2959' 5750 3090
7" 9273' 8793' 7240 5410
4-1/2" 9070' - 9700' 8592' - 9216' 8430 7500
113'
2989'
9241'
Perforation Depth MD (ft): Perforation Depth TVD (ft):
9380' - 9516' 8899' - 9034'
Packers and SSSV Type: 7" x 4-1/2" Baker 'S-3' packer;
3-1/2" HES 'X' Nipple
Tubing Size:
3-1/2",9.3#
Tubing Grade:
L-80
Packers and SSSV MD (ft): 9017'
2014'
Tubing MD (ft):
9075'
12. Attachments:
iii Description Summary of Proposal
0 Detailed Operations Program
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Sean McLaughlin Title CT Drilling Engineer
ç-^- M (L/'~
13. Well Class after proposed work:
0 Exploratory iii Development 0 Service
December 1 2004 /' 15. Well Statu~ a~:r ProPo~dG:~rk: 0 Plugged
Date: 0 WAG 0 GINJ 0 WINJ
IBI Abandoned
0 WDSPL
0 BOP Sketch
Contact Sean McLaughlin, 564-4387
Signature
Phone 564-4694
Commission Use Only
Prepared By Name/Number:
Date It fz./c)í-f Terrie Hubble, 564-4628
I Sundry Number: 30 cf-l( 0 C)
Conditions of approval: Notify Commission so that a representative may witness
0 Plug Integrity
0 BOP Test
0 Mechanical Integrity Test
0 Location Clearance
Other: ~) P tV veJ I:£; ¡/ W"- I 0 ' 4- 0 t
Subsequent For ired:~~l .
Approved y ~ 7
Form 10-403 - ~evi d 06/:z004
~rc1h1' d íb ¡r (;htc,.¿( ~ If t - 31 Ih
RBDMS BFL NOV - 4 7004
"--
COMMISSIONER
O~'G NAL
APPROVED BY
THE COMMISSION
Date ff~¿:te
,i
')
)
.þ
JJ
To:
Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: S.M. McLaughlin
CTD Engineer
Date: November 02, 2004
Re:
P&A operations for well Z-39 as part of the CTD sidetrack
Well Z-39 is a candidate for a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drilling rig. The
sidetrack, Z-39A, will exit the 4-1/2" liner off a whipstock and target Zone 4. The proposed kick offpoint is
above the existing perforations, which will be isolated by a cement plug. The following describes work planned
for the P&A and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is
attached for reference.
Pre CTD Summary
1) 0 MIT-OA
2) 0 MIT -IA
3) 0 AC-LDS/POT; AC-PPPOT-IC; AC-PPPOT-T
4) E Set whipstock at 9283' I
5) C P&A parent well with 15.8 ppg cement. (lObbl)
The pre CTD work is slated to begin on 12/01/04.
Sean McLaughlin
CTD Drilling Engineer
564-4387
CC:
Well File
Sondra StewmanlTerrie Hubble
, 4-1/16" CWV
FMC
BAKER
86.04'
54.81'
2200'
. . . ... ..... ... . . . . . . .
27 @ 3518'
'. . .. 9361'
8800' SS
TREE =
WEL'iHËÄD =
J\ CTUA TOR =
KB. ELEV =
BF. ELEV =
KOP=
n",..... '''' ........ .
Max Angle =
~. . . . '.. .,
Datum MD =
Datum NO =
')
9-5/8" CSG, 40#, L-80, 10 = 8.835" l-i 3023'
Minimum ID = 2.750" @ 9063"
3-1/2" HES XN NIPPLE
I 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" I
I 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" 1-1 9074'
Z-39
I
r--4
L
I
Z
I ,
)sAFETY NOTES:
=---1 1074' 1-19-5/8" TAM PORT COLLAR I
I 2014' 1-13-1/2" HES X NIP, ID = 2.813" I
I
~
ST MD
6 3106
5 4756
4 5836
3 6943
2 7960
1 8966
I
~
t ~
I
\ J I
¡ ~
~~
I
II
~.'..
I
7" CSG, 26#, L-80, ID = 6.276" l-i 9273' ~
DA TE REV BY
PERFORA TION SUMMARY
REF LOG: **MWD GRlRES ON 02/25/02
ANGLE AT TOP PERF: 8° @ 9380'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
2-1/2" 6 9380 - 9405 0 04/05/02
2-1/2" 6 9420 - 9435 0 04/05/02
2-1/2" 6 9440 - 9450 0 04/05/02
2-1/2" 6 9477 - 9485 0 04/05/02
2-1/2" 6 9494 - 9516 0 04/05/02
I PBTD l-t 9612'
4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 1-1 9700'
DATE
03/17/02
03/29/02
04/05/02
07/22/03
08/29/03
REV BY
COMMENTS
ORIGINAL COM PLETION
CORRECTIONS
ADD PERFS
GL V C/O
GL V C/O
CI-VTP
TMN/tlh
JBM/KK
JLJ/KK
~~
..
COMMENTS
WDDEV
2947 26
4429 26
5406 26
6437 17
7419 12
8403 8
GAS LIFT MANDRELS
TYPE VLV LATCH PORT
MMG DOME RK 16
MMG DOME RK 16
MMG DOME RK 16
MMG SO RK 24
MMG DMY RK 0
MMG DMY RK 0
DATE
08/29/03
08/29/03
08/29/03
08/29/03
08/29/03
03/17/02
8994' 1-13-1/2" HES X NIP, ID = 2,813" 1
9016' 1--11" X 4-1/2" BKR S-3 PKR, ID = 3.875" 1
9042' 1-13-1/2" HES X NIP, 10 = 2.813" I
9063' 1-13-1/2" HES XN NIP, ID = 2,750" 1
9070'
9075'
9077'
9083'
9069'
1-1 TOP OF BKRTIEBACK SLY, ID = 5.250" 1
1--13-1/2" WLEG, ID = 2.992" 1
1-1 7" X 4-1/2" BKR ZXP PKR, ID = 4.405" 1
1-1 7" X 4-1/2" BKR HMC HGR, ID = 4.450" I
l-i ELMO TT LOGGED 02/25/02? 1
PRUDHOE BAY UNIT
WELL: Z-39
PERMIT No: 2002080
API No: 50-029-22995-00
SEC 19, T11 N, R12E, 4301' NSL & 3238' WEL
BP Exploration (Alaska)
,~
4-1/16" CIW
FMC
BAKER
86.04'
54.87'
2200'
, ~. ~" , . , . .".
27 @ 3518'
-." ." ,,".... ...
9367'
. . .. .
8800' SS
-)
TRES=,'" ,
WELLHEAD =
'ÄCTUATÓR;
". "'"
KB. ELEV =
BF. ELEV =
.. - . . . .
KOP=
rvlax Angle =
'. . w , "...
Datum MD =
." " ' '"
Datum lVD =
I 9-5/8" CSG, 40#, L-80, ID = 8.835" I~ 3023' ~
Minimum ID = 2.750" @ 9063"
3-1/2" HES XN NIPPLE
I 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" 1
TOP OF 2-3/8" LNR - 9050'
Top of Cerrent 9050'
I 3-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" I~ 9074'
7" CSG, 26#, L-80, ID = 6.276" I~ 9273'
I Mechanical Whipstock I~ 9283'
PERFORA TION SUMMARY
REF LOG: **MWD GRlRES ON 02/25/02
ANGLEATTOPÆRF: 8° @ 9380'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 6 9380 - 9405 isolated proposed
2-1/2" 6 9420 - 9435 isolated proposed
2-1/2" 6 9440 - 9450 isolated proposed
2-1/2" 6 9477 - 9485 isolated proposed
2-1/2" 6 9494 - 9516 isolated proposed
I PBTD I~ 9612'
I 4-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" I~ 9700'
DATE
03/17/02
03/29/02
04/05/02
07/22/03
08/29/03
REV BY
COMMENTS
ORIGINAL COM PLETION
CORRECTIONS
ADD PERFS
GL V C/O
GL V C/O
Z-39A
Proposed CTD Sidetrack
ÀAFETY NOTES:
I
-
-
=--1 1074' 1~9-5/8" TAM PORT COLLAR 1
I 2014' 1~3-1/2"HESXNIP,ID=2.813" 1
I
I
~
L
ST MD
6 3106
5 4756
4 5836
3 6943
2 7960
1 8966
I
:8:
~
I
~
J I
f--j
I
~
DA TE REV BY
CI-VTP
TMN/tlh
JBM'KK
JLJ/KK
COMMENTS
GAS LIFT MANDRELS
lVD DEV TYPE VLV LATCH PORT
2947 26 MMG DOME RK 16
4429 26 MMG DOME RK 16
5406 26 MMG DOME RK 16
6437 17 MMG SO RK 24
7419 12 MMG DMY RK 0
8403 8 MMG DMY RK 0
DATE
08/29/03
08/29/03
08/29/03
08/29/03
08/29/03
03/17/02
8994' 1-f3-1/2" HESXNIP, ID=2.813" 1
9016' Ij7"X4-1/2"BKRS-3A<R,ID=3.875" 1
9042' 1-13-1/2" HES X'NIP, ID = 2.813" 1
9063' 1-13-1/2" HES XN NIP, ID = 2.750" 1
9070' I~TOPOF BKRTIEBACK SLY, ID = 5.250" 1
9075' Ij3-1/2" WLEG, ID = 2.992" I
9077' I~ 7" X 4-1/2" BKR ZXP A<R, ID = 4.405" 1
9083' 1-1 7" x 4-1/2" BKR HMC HGR, ID = 4.450" 1
9069' I~ ELMD TT LOGGED 02/25/02? 1
I 2-3/8" cmt'ed and perfed
~."...'.'..'....~
1
I~ 11550' 1
PRUDHOE BAY UNIT
WB..L: Z-39
PERMIT No: 2002080
API No: 50-029-22995-00
SEC 19, T11 N, R12E, 4301' NSL & 3238' WB..
BP Exploration (Alaska)
. 7004
1. Operations Performed: Stimulate¡I]¡;!¡a Oil {~ (tI1IJ6n~, Cj)mmi:j~¡ml
Abandon D RepairWellD PluQ PerforationsD
After Casing 0 Pull TubingD Perforate New PoolO waiverD Time Ext'~l^drn1ilg1:
Change Approved Program 0 Operation Shutdown 0 Perforate [K Re-enter Suspended Well 0
2. Operator 4. Current Well Class: 5. Permit to Drill Number:
Name: BP Exploration (Alaska), Inc. . 200-2080
Development Œ} ExploratoryD
3. Address: P.O. Box 196612 6. API Number
Anchorage, Ak 99519-6612 Stratigraphic 0 Service 0 50-029-22995-00-00
7. KB Elevation (ft): 9. Well Name and Number:
86.04 Z-39
8. Property Designation: 10. Field/Pool(s):
ADL-0028262 Prudhoe Bay Field / Prudhoe Oil Pool
11. Present Well Condition Summary:
Total Depth measured 9700 feet
true vertical 9215.9 feet Plugs (measured) None
Effective Depth measured 9612 feet Junk (measured) None
true vertical 9128.7 feet
Casing Length Size MD TVD Burst Collapse
Conductor 78 20" 91.5# H-40 35 - 113 35.0 - 113.0 1490 470
Liner 628 4-1/2" 12.6# L-80 9070 - 9698 8592.0 - 9213.9 8430 7500
Production 9239 7" 26# L-80 32 - 9271 32.0 - 8791.0 7240 5410
Surface 2988 9-5/8" 40# N-80 34 - 3022 34.0 - 2957.7 5750 3090
Perforation depth:
Measured depth: 9420 - 9435, 9440 - 9450,9477 - 9485,9494 - 9495,9495 - 9515, 9515 - 9516
True vertical depth: 8938.55 - 8953.4, 8958.35 - 8968.25, 8994.97 - 9002.89, 9011.8 - 9012.79, 9012.79 - 9032.59, 9032.59 - 9033.58
Tubing ( size, grade, and measured depth): 3-1/2" 9.3# L-80 @ 31 - 9074
Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer @ 9017
4-1/2" Baker ZXP Packer @ 9077
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13 Representative Dailv Averaae Production or Iniection Data
Oil-Bbl Gas-Met Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 189 3.5 1186 720 315
Subsequent to operation: 36 0.03 284 700 258
14. Attachments: 15. Well Class after proposed work:
ExploratoryD Development ŒI ServiceD
Copies of Logs and Surveys run _ 16. Well Status after proposed work:
OilŒ} GasD WAG 0 GINJD WINJD WDSPLD
Daily Report of Well Operations. X Prepared by Garry Catron (907) 564-4657.
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt:
Contact Garry Catron NIA
Printed Name Garry Catron Title Production Technical Assistant
Signature ....~/..,. r ,'. -/-ï;..... Phone 564-4657 Date 6/25/04
A
~ ~
. ' STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSIONRECEf\/ED
REPORT OF SUNDRY WELL OPERATIONSo 1
Form 10-404 Revised 4/2004
ORIGINAL
b¡i¥'ih
Jut Q ~ ?nHi,
·
,r--..
r---.\
Z-39
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
05/05/04 *** TRAVEL FROM Q-02 ***. WELL SHUT-IN ON ARRIVAL. DRIFT W/ 2-1/2" DUMMY GUN
( PRE- ADPERF ) W / TEL & SAMPLE BAILER ( 165" OAL.). (TAG TD AT 9591'
CORRECTED. 75' RAT HOLE). Dff COMPLETE, RIG DOWN
05/10/04 Perforate 9420'-9435' 6 SPF, 9440'-9450' 6 SPF, 9477'-9485' 6 SPF, 9495'-9515' 6 SPF
FLUIDS PUMPED
BBLS
: TOT AL
No Fluids Pumped
o
Page 1
..
---.
~,
TREE = 4-1/16" aw I
W8..U-EAD = FMC SAFETY NOTES:
ACTUATOR = BAKER Z-39
KB, ELEV = 86.04'
BF, ELBI = 54.87'
KOP= 2200' ; :f- 1074' H9-5/8" TAM FORr OOLLAR I
Max Angle = 27 @ 3518'
Datum MD = 9367' I ~ 2014' 3-1/2' HES X NIP, ID = 2.813" I
DatumTVD- 8800' SS
I 9-518" CSG, 40#, L-80. ID = 8.835" 3023' 1----4 ..
GAS LIFT MANDRELS
ST MD TVD rEV TYPE VLV LATCH FORr DA1E
Minimum ID = 2,750" @ 9063' L '-- - 1 3106 2947 26 t<vtv1G DOME RK 16 03119/04
3-1/2" HES XN NIPPLE 2 4756 4429 26 t<vtv1G DOME RK 16 03119/04
3 5836 5406 26 t<vtv1G DOME RK 16 03119/04
4 6943 6437 17 t<vtv1G SO RK 24 03119/04
5 7960 7419 12 t<vtv1G DMY RK 0 03119/04
6 8966 8403 8 t<vtv1G DMY RK 0 03119/04
3-1/2"TBG. 9.3#. L-80, .0087 bpf, ID =2.992" I
r 8994' 3-1/2' HES X NIP. ID = 2.813" I
I
:8: :ð 9016' U7"X 4-1/2" BKRS-3PKR. D =3.875" I
I 9042' 3-1/2' HES X NIP, ID= 2.813" I
I
I 9063' 3-1/2' HES XN NIP, ID =2,750" I
9070' TOP OF BKR TIEBACK SL V, 10 = 5.250" I
I 3-1/2" TBG. 9,3#, L-80, .0087 bpf, D = 2.992" 9074' I I
9075' 3-1/2' WLEG. ID= 2.992" I
1 .~
II-=: 9077' 7" X 4-1/2' BKR ZXPPKR. ID = 4.405" I
9083' 7" X 4-1/2' BKR HvlC HGR. 10 = 4.450" I
I 7" CSG, 26#. L-80, ID = 6.276" 9273' ~ ... I 9069' H ELMD TT LOGGED 02/25/02?
PffiFORA TION SUt<vtv1ARY
REF LOG: **MWD GRlRES ON 02/25102
ANGLE AT TOP PERF: 8 @ 9380'
f\bte: Refer to Production DB for historical perf data
SIZE SPF INfERV AL OpnlSqz DA1E
2-1/2" 6 9380 - 9405 0 04105102
2-1/2" 6 9420 - 9435 0 04/05102
2-1/2" 6 9440 - 9450 0 04105102
2-1/2" 6 9477 - 9485 0 04105102
2-1/2" 6 9494 - 9516 0 04105102
I A3TD 9612' I
I 4-1/2" LNR, 12,6#. L-80, .0152 bpf.ID= 3,958" 9700'
DA1E REV BY COMrvENTS DATE REV BY OOMrvENTS PRUDI-OE BAY IJIJIT
03117/02 ORIGINAL COMPLETION 03/24/04 JLJITLH GL V C/O WELL: Z-39
03129102 CH/TP CORRECllONS PffiMT f\b: 2002080
04105/02 TMNltlh ADD ÆRFS API f\b: 50-029-22995-00
07/22103 JBMA<K GLV ClO SEC 19, T11 N. R12E, 4301' NSL & 3238' W8..
08129/03 JLJ/KK GLV ClO
01/27/04 GJB/TLP GLV ClO BP Exploration (Alaska)
~Ó~'1
DATA SUBMITTAL COMPLIANCE REPORT
4/29/2004
)' rVì(J~
s: Gt.¿ ')....(J...<./ ÀÖC;.')...
A>¡( No. 50-029-22995-00-00
NC
Operator BP EXPLORATION (ALASKA)
Well NamelNo. PRUDHOE BAY UNIT Z-39
2002080
Permit to Dri
~
..---
1-01L
Current Status
1-01L
Completion Status
/
4/5/2002
/' Completion Date
9216
TVD
,..--'
9700
MD
REQUIRED INFORMATION
<I Á.A,
NÔ
Directional Survey
No
Samples
No
Mud Log
Well Data Maint
Master
(data taken from Logs Portion of
Logs Run:
DATA INFORMATION
Types Electric or Other
Wel
)
OH
CH
Case
Interval
Start Stop
~ -
55 9679
Run
No
Log Log
Scale Media
Log Information:
Electr
Dataset
Number
11079
Digital
Med/Frmt
D
Logl
Data
Type
b
Comments
Received
9/27/2002
Name
9/27/2002
Case
9679
55
LDWG Formatted Open
Hole Edit
AIT/BHC/P
EXICMR
Pump in Temperature
Survey
Wel
4/12/2002
Case
7302
2844
0725
C
Digital
Production Log w/DEFT -
Press- T emp-Grad-Spinners
Logging Data
7/19/2002
2/13/2003
7/23/2003
Case
9540
9300
Blu
i Rpt
r
I
I Log
ìF
Log
Case
Case
9446
9700
9280
59
Blu
5
11557
c
Production Log w/DEFT -
Press- T emp-Grad-Spinners
7/23/2003
Case
9540
9300
Blu
Vl
)
Production Log w/DEFT -
Press- Temp-Grad-Spinners
7/23/2003
Case
9540
9300
Blu
Log
Production Log w/DEFT-
Press- T emp-Grad-Spinners
7/23/2003
Case
9540
9300
Blu
Log
Production Log w/DEFT -
Press- T emp-Grad-Spinners
7/23/2003
Case
9540
9300
Blu
RST-C Borax Log wfTemp
& Pressure
11/3/2003
Case
9525
9262
12238
Tf
RST-C Borax Log wfTemp
& Pressure
11/3/2003
Case
9525
9262
25
12238
Pds
RST -C Borax log wfTemp
& Pressure
11/3/2003
Case
9525
9262
Blu
25
RST-C Borax Log wfTemp
& Pressure
RST-C Borax Log wfTemp
& Pressure
11/3/2003
11/312003
Case
Case
9525
9525
9262
9262
Blu
25
25
12238
Pds
t:
Log
D C
L~
Log
....-.
DATA SUBMITTAL COMPLIANCE REPORT
4/29/2004
API No. 50-029-22995-00-00
BP EXPLORATION (ALASKA) INC
Operator
Well Name/No. PRUDHOE BAY UNIT Z-39
2002080
Permit to Dri
UIC N
1-01L
11/3/2003
Current Status
9525 Case
1-01L
Completion Status
25
4/5/2002
Completion Date
9216
TVD
9700
C Pds
MD
"L-
ED
RST-C Borax Log wlTemp
& Pressure
9262
RST-C Borax Log wlTemp
& Pressure
11/3/2003
Case
9525
9262
Blu
25
Log
)
/
Comments
Sample
Set
Number
Received
Sent
Interval
Stop
7280
Start
7128
Well Cores/Samples Information:
Name
Core Chips
1086
ADDITIONAL INFORMATION
Well Cored?
~/N
œ/N
Daily History Received?
~.vJ
f.
t,r.) "I-.J"J ¡....J.
6ŸN
Ø/N
Y/fV
Formation Tops
Chips Received?
u1U- &~
(
>'"' t{ - f..{ 7 roC':.
~ huJ V\'\ 41\,
rL4 ~ [-c"
S'~År~
rev \r ~
Analysis
Received?
Comments:
~
)
~
Date:
Compliance Reviewed By:
~
~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
Abandon 0 SuspendD Operation Shutdown 0 Perforate 0 WaiverD OtherD
Alter Casing D RepairWellD Plug PerforationsŒ] Stimulate D Time ExtensionD
Change Approved Program D Pull TubingD Perforate New Pool D Re-enter Suspended Well 0
2. Operator 4. Current Well Class: 5. Permit to Drill Number:
Name: BP Exploration (Alaska), Inc. 200-2080
Development Œ] ExploratoryD
3. Address: P.O. Box 196612 6. API Number
Anchorage, Ak 99519-6612 StratigraphicD ServiceD 50-029-22995-00-00
7. KB Elevation (ft): 9. Well Name and Number:
86.04 Z-39
8. Property Designation: 10. Field/Pool(s):
ADL-0028262 Prudhoe Bay Field / Prudhoe Oil Pool
11. Present Well Condition Summary:
Total Depth measured 9700 feet
true vertical 9215.9 feet Plugs (measured) None
Effective Depth measured 9612 feet Junk (measured) None
true vertical 9128.7 feet
Casing Length Size MD TVD Burst Collapse
Conductor 78 20" 91.5# H-40 35 - 113 35.0 - 113.0 1490 470
Liner 628 4-1/2" 12.6# L-80 9070 - 9698 8592.0 - 9213.9 8430 7500
Production 9239 7" 26# L-80 32 - 9271 32.0 - 8791.0 7240 5410
Surface 2988 9-5/8" 40# N-80 34 - 3022 34.0 - 2957.7 5750 3090
Perforation depth:
Measured depth: 9420 - 9435,9440 - 9450,9477 - 9485,9494 - 9516 RECEIVED
True vertical depth: 8938.55 - 8953.4, 8958.35 - 8968.25, 8994.97 - 9002.89, 9011.8 - 9033.58
Tubing ( size, grade, and measured depth): 3-1/2" 9.3# L-80 @ 31 - 9074 APR 1 4 2004
Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer @ 9017 Alaska Oil & Gas Cons. Commission
4-1/2" Baker ZXP Packer @ 9077 Anchoraoe
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13 Representative Dailv Averaae Production or Iniection Data
Oil-Bbl Gas-Mel Water-Bbl Casing Pressure Tubina Pressure
Prior to well operation: 57 0.6 1871 775 327
Subsequent to operation: 48 0.5 1642 1500 311
14. Attachments: 15. Well Class after proposed work:
ExploratoryD Development Œ] ServiceD
Copies of Logs and Surveys run _ 16. Well Status after proposed work: Operational Shutdown 0
OilŒ] GasD WAGD GINJD WINJD WDSPLD
Daily Report of Well Operations X Prepared by Garry Catron (907) 564-4657.
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ISUndry Number or NIA if C.O. Exempt:
Contact Garry Catron N/A
Printed Name Garry Catron Title Production Technical Assistant
Signature }( ~ (' -k-_ Phone 564-4657 Date 4/13/04
ORIGINAL
RBDMS Bfl
APR 114 11M
Form 1 0-404 Revised 12/2003
~
~
Z-39
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
03/17/04 Sand plug set @ 9405'-9612'
03/17/04 Batch up and QC 30 bbls LARC 15.8 ppg cment (5 bbls with 12 ppb aggregate). Lay cement
in fro 9395'. Pump 26 bbls cement. Estimate 6 bbls behind pipe. Estimate TOC at 7350'.
Build awueeze pressure up to 3500 psi WHP in 500 psi steps. Hold for 1 hour. JFT
Contamiate and clean out cement to 9407'. Make up/dn passes from 9407' to 6500'. lay in
TEA from 9407' and POOh at 80% while jetting all jewlery and tree on way out. FP tubing from
2500' to surface w 60/40 methonal. Cement set from 7350'-9405'.
03/18/04 *** WELL SHUT-IN ON ARRVIAL ***
RIH W/2.5" CENT, TEL & 1.77" SAMPLE BAILER.
(RUN DEEP G/L DESIGN) (POST CMT SQUEEZE)
***** CONTINUE ON 3-19-04*****
03/19/04 Station 3,4,5,6
03/19/04 *** CONTINUNE FROM 3/18/04 *** ( POST CEMENT SQUEEZE)
CONTINUE IN HOLE W/2.5" CENT, TEL, SAMPLE BAILER.
TAGGED HARD BOTTOM @ 9408' CORRECTED DEPTH. ONLY TOP SET OF PERFS
OPEN. 25'
SET 3.5" WHIDDON CATCHER IN XN NIPPLE.
03/21/04 T/I/0=1300/900170. TEMP=SI. INFLOW TEST (POST SQUEEZE); INITIAL IA FL AT 60'.
PUMPED A SPEAR OF 3 BBLS OF METHANOL, STARTED INJECTING GAS LIFT WHILE
TAKING RETURNS TO FLOWLINE. PUMPED ADDITIONAL 1 BBL OF METHANOL.
PUSHED IA FL TO 4756' (ST. #2), SI WING AND MONITORED TBG & IA FL FOR 20
MINUTES WITH A FINAL TBG FL AT 1450'. CONTINUED INJECTING GAS LIFT AND
TAKING RETURNS DOWN FLOWLINE. PUSHED IA FL TO 5250', SI GAS LIFT AND LEFT
WING OPEN FOR 30 MINUTES. SI WING AND THE TBG FL WAS 1790' AND THE IA FL
WAS 5310'. SHOT FL'S EVERY 15 MINUTES FOR 1 HOUR AND THE TBG FL SLOWLY
DROPPED TO 1980' AND THE TBG PRESSURE INCREASED FROM 300 PSI TO 340 PSI.
THE lAP REMAINED UNCHANGED AND THE IA FL STABILIZED AT 5320'. PUMP TRUCK
ON LOCATION TO FREEZE PROTECT. FINAL WHP'S=340/1220170.
03/22/04 CTU #9: MILL CEMENT. MIRU CTU, MU WFRD 2-1/8" MHA AND MOTOR W/2.70" OD MILL
AND RIH. DRY TAG TOC AT 9407' CTM. START MILLING CEMENT FROM 9407' TO 9408'
AND BROKE THROUGH. FCO TO 9580' CTM. CONTINUED ON 3/23/04 WSR
03/22/04 Sand plug removed @ 9405'-9612'
FLUIDS PUMPED
BBLS
315 60/ 40 Methonal
18 Neat Methonal
1028 1% XS KCL
100 Bio
8 Tea
8 Gel
5 8 PPQ slurrv with 1050 # 20/40 Carbolite and 100 # 20/40 sand
25 12% KCL w/additives
47.5 15.8 PPQ LARC Cement
162 1 .5# Biozan
220 Diesel
5 Water
300 1 % KCL
2241.5 TOTAL
Page 1
---...
~
TREE = 4-1/16" OW I
WB..U-EAD = FMC SAFETY NOTES:
AGrUATOR = BAKER Z-39
KB. ELEV = 86.04'
BF. ELBJ - 54.87'
KOP= 2200' : :~ 1074' H9-5/8" TAM FORT COLLAR I
Max Angle = 27 @ 3518'
Datum MD = 9367' 2014' 3-1/2" HES X NIP, 10 = 2.813" I
DatumTVD= 8800' SS I
I 9-518" CSG, 40#, L-80, 10 = 8.835" 3023' ~ ~
GAS LIFT MANDRELS
ST MD TVD DEV lYPE VLV LATCH FORT D<\1E
Minimum ID = 2.750" @ 9063' U - - 1 3106 2947 26 MIiIG DOME ~ 16 03119/04
3-1/2" HES XN NIPPLE 2 4756 4429 26 MIiIG DOME ~ 16 03119/04
3 5836 5406 26 MIiIG DOME ~ 16 03119/04
4 6943 6437 17 MIiIG SO ~ 24 03119/04
5 7960 7419 12 MIiIG DMY ~ 0 03119/04
6 8966 8403 8 MIiIG DMY ~ 0 03119/04
I 3-1/2"TBG. 9.3#. L-80. .0087 bpf.lD =2.992" I
I 8994' 3-1/2" HES X NIP, 10 = 2.813" I
I
:8: 2S 9016' LJ7" X 4-1(2" BKRS-3 PKR, D = 3.875" I
I 9042' 3-1/2" HES X NIP, 10 = 2,813" I
I
I I 9063' 3-1/2" HES XN IIIP. 10 = 2.750" I
I 9070' TOP OF BKRTI83ACKSLV, ID= 5.250" I
I 3-1/2" TBG, 9.3#. L-80. ,0087 bpf, D = 2.992" 9074'
tl 9075' 3-1/2" WLEG, ID- 2.992" I
I --== 9077' 7" X 4-1/2" BKR ZXPPKR, 10 = 4.405" I
9083' 7" X 4-1/2" BKR !-MC HGR, ID = 4.450" I
I 7" CSG. 26#. L-80, 10 = 6.276" 9273' ----A ~ I 9069' H ELMD TT LOGGED 02/25/02?
PERFORATION SUMIiIARY
REF LOG: **MWD GRlRES ON 02(25102
ANGLE AT TOP PERF: 8 @ 9380'
tlbte: Refer to Production DB for historical perf data
SIZE SPF INTER,{ AL OpnlSqz D<\ 1E
2-112" 6 9380 - 9405 0 04105102
2-1/2" 6 9420 - 9435 0 04105102
2-1/2" 6 9440 - 9450 0 04105102
2-112" 6 9477 - 9485 0 04105102
2-1/2" 6 9494 - 9516 0 04105102
FBTD 9612' I
I 4-1/2" LNR, 12.6#. L-80. ,0152 bpf, ID = 3.958" 9700' I
D<\1E REV BY COMM:NTS DATE REV BY COMM:NTS PRUDHOE BAY lJ\IlT
03117/02 ORIGINAL COMPLETION 03/24/04 JLJlfLH GL V C/O WELL: Z-39
03129102 CHIll' CORRECTIONS PERMT tIb: 2002080
04105/02 TMNltlh AOO ÆRFS API tIb: 50-029-22995-00
07/22103 JBMIKK GLV C/O SEC 19, T11 N, R12E. 4301' NSL & 3238' WB..
08129/03 JLJ/KK GLV C/O
01/27/04 GJB/1LP GLV C/O BP Exploration (Alaska)
10/31/03
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Wee pie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
NO. 3017
Company:
Scblumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATIN: Beth
Field: Prudhoe Bay
Color
Prints
)
CD
Blueline
:¡
1
1
1
1
1
:¡
:¡
1
1
1
:¡
:¡
:¡
1
Date
09ï29To3
10/01/07
10125103
07110103
07118/03
10/24/03
10/26/03
10/22/03
10/08/03
10/12/07
10/15/07
10/14/03
10/21/03
10/25/07
09/22/03
Log Description
MEM PPROF & IPROF LOG
MEM PPROF & IPROF LOG
PSP LDL
RST GRAVEL PACK LOG
LDL
PSP LDL
PROD PROFILE W/DEFT/GHOST
LDL
TEMP PROFILElSBHP SURVEY
LDL
PROD PROFILE W/DEFT
LDL
LDL
LDL
RST -SIGMA
Job#
Wel
H-19B
H-27 A
D.S. 1-10
D.S.15-23
JX-02A
D.S. 14-23
P1-17
D.S.4-42
GNI-02
D.S.6-16 .
P1-18A
D.S. 5-28A
D.S. 12-20
2-32/SN-03
Z-39
~
" ,.1.
i'
';:-
,-
~
1
10563105
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TIN: Beth
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
a ]"- -~ C,'¡
~~Ú ~U
~ 'ff 1-
.,.,:=:
~=
~~
Received
Date Delivered:
(....·iJrnm!5S10n
A_~çhor!1gE:
~\) ~\"--~
07/22/03
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
NO. 2916
Company:
Sc~lumbepgep
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
Field: Prudhoe Bay
Endicott
')
Z-39 ;::::} (-., Þ<.. PROD lOG W/DEFT 07/19/03 1
D.S. 2-14 \< r"}-('"'. \ q RST GRAVEL PACK 07/17103 1
~ \C '> -éJ :O(J lDL 07/16/03 1
N-11B 0q.... e:;, .., SBHP SURVEY 07/16/03 1
D.S.15-0S ~ c ~- ~ RST GRAVEL PACK 07/14/03 1
D-03A ~ l<: ... <::; MEM PROD PROFILE 06/19/03 1
K-317B ~ ,...)\.... ~. ( () PROD PROFILE W/DEFT 06/09/03 1
D.S.5-04A I(/,-(:<q MEM PROD PROFILE 06/14/03 1
D-13A ? "'J"'''' =<:: I MEM PROD PROFILE 06/23/03 1
D.S.5-02A Ie' ~\ ,¡?. L \' MEM PROD PROFILE 06/10/03 1
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
CD
Color
Prints
Blueline
Date
Log Description
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Job#
Wel
/
RECEIVED
fY\.
ttJ! 27 '}(j(\'7
\..' l i... 0 [''J~t'J
f),
t,,,;.,·
'~~a5ka
Date Delivered
~~~\'C\.~
.-..
-----
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage,AJaska 99501
February 12,2003
RE: MWD Formation Evaluation Logs: Z-39,
AK-MW-22034
éìCfJ -c;)0?š
/{55,
Z-39:
Digital Log Images
50-029-22995-00
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, AJaska 99518
Date:
BP Exploration (AJaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Si~(~
RECEIVED
FEB 1 3 2003
Alaska Of, & Gas Cons. Commiaafon
Anchchge
-...
------
dCü~~~
/IOΡ
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
September 25,2002
RE: MWD Formation Evaluation Logs 2-39,
AK-MW-22034
1 LDWG formatted Disc with verification listing.
API#: 50-029-22995-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
SigDl~:C:~~:' u. (ftap-J
Date:
RECE\VED
St.? 2. 7 2.002
AiaeKa 0\\ & Gas Cons. Commiø\.on
AntmQ1'$g6
6/02
07/
Scblumberger
Comm
00
NO. 2230
Company: State of Alaska
Alaska Oil & Gas Cons
Aftn: Lisa Weepie
333 West 7th Ave, Suite
Anchorage, AK 99501
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
)
CD
Field: Prudhoe Boy
Color
Dote Blueline Sepia Prints
06/23/02 1
06/19/02 1
06/13/02 1
06/28/02 1
06/16/02 1
06/20/02 1
06/14/02 1
06/24/02 1
06/05/02 1
06/18/02 1
06/17/02 1
06/18/02 1
06/17/02 1
log Description
CHFR
CHFR
STATIC PRESSITEMP SURVEY
INJECTION PROFILE
CHFR
CHFR
CHFR
PROD PROFILE/DEFT
PROD PROFILE/DEFT
PROD PROFILE/DEFT
PROD PROFILE/DEFT
LEAK DETECTION LOG
PUMP-IN TEMP SURVEY
Job #
Wet
)
Schlumberger GeoQuest
3940 Arctic Blvd. Suite 300
LR2-
BP Exploration (Alaska) Inc.
Petrotectnical Data Center
900 E, Benson Blvd,
Anchorage. Alaska 99508
Anchorage. AK 99503-57
ATTN: Sherrie
."""" 'r .,..... F' \'r¡.J"- r-,
.~ ~~~1tt~ 'I~ ~ ~ ~ J.~..
s ,~~~~ ~ bLr.
f\r-.!"lrÎ
LvtJL
19
Received
'L"
1,) !L
Gas Cons.v;mmlssion
A.ncnc-rage
"
t;t
Alaska C;)
Date Delivered
,~
~
~ð/- d08'
I ° <6'5 ô
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
3 33 West 7th Avenue, Suite 100
Anchorage, Alaska
June 04, 2002
RE: MWD Fonnation Evaluation Logs E-I04,
AK-MM-11195
1 LDWG fonnatted Disc with verification listing.
API#: 50-029-23049-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Signd~
Date:
RECEIVED
!! Ir\1 0 ::: 1)002
"VI' v L
Alaska Oil & Gas Cons. Conuniion
Anchorage
~
~
~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
a Oil o Gas o Suspended o Abandoned o Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 200-208
3. Address 8. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22995-00
--~
4. Location of well at surface 10CATtoN$ ¡ \,VI,¡¡' LC l1ur¡ 9. Unit or Lease Name
4300' NSL, 3237' WEL, SEC. 19, T11 N, R12E, UM :~ ! DATE ' Prudhoe Bay Unit
At top of productive interval -¥-P~~'~
3097' NSL, 1025' WEL, SEC. 19, T11N, R12E, UM t' VE~
At total depth B.iL .r 10. Well Number
-~..... , ~,--- Z-39
3076' NSL, 993' WEL, SEC. 19, T11N, R12E, UM , ' .' ........,'-'"
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
RKB = 86.04' ADL 028262
12. Da~pudded 113. Date T.D. Reached 14. Date Comp., Susp., or Aband. 115. Water depth, if offshore 16. No. of Completions
2/ "/2002 ßj 3/15/2002 4/5/2002 N/A MSL One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD).119. Directional Survey 120. Depth where SSSV se~r 21. Thickness of Permafrost
9700 9216 FT 9655 9171 FT a Yes 0 No (Nipple) 2014' MD 1900' (Approx.)
22. Type Electric or Other Logs Run
RES / AIT, DT / BHC, CNL, LDL, GR, Caliper, SP, MRES, MWD, DGR / EWR , CMR , MDT
23. CASING LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 113' 30" 60 sx Arctic Set fADDrox.)
9-5/8" 40# L-80 34' 3023' 12-1/4" 79 sx Articset Lite 3 221 sx Class 'G'
7" 26# L-80 32' 9273' 8-3/4" 51sx Lite Crete 100 sx Class 'G'
4-1/2" 12.6# 13Cr 9070' 9700' 6-1/8" 78 sx Class 'G'
24. Perforations open to Production (MD+ TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-1/2" Gun Diameter, 6 SPF 3-1/2",9.3#, L-80 9075' 9017'
MD TVD MD TVD
9380' - 9405' 8899' - 8924' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
9420' - 9435' 8939' - 8953' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9440' - 9450' 8958' - 8968' Freeze Protected with 75 Bbls of Diesel
9477' - 9485' 8995' - 9003'
9494' - 9516' 9012' - 9034'
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
April 15, 2002 Gas Lift
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
5/3/2002 4 TEST PERIOD 279 768 984 176 / 64 2750
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE 25.5
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. sUbRErêtsl V E D
Core Analysis Report attached. H Ò\i '1 ¡:7 'lOG?
" 1;~. ¡ \.1 LIt...
Alaska Oil & Gas Cons, LoníWbS\m
Anchora{fH
U F~ J pO ,\ , ;\] /~\\ l._ MAY
Form 10-407 Rev. 07-01-80 1 20 2002 Submit In Duplicate
j
RBOMS BFL
GF'
Summary of Daily Drilling Reports, Surveys, Post Rig Work Summary, Leak-Off Test Summary and Core
Summary Report.
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble -( ~ tit f1. /) IJ. Title Technical Assistant
Z-39 200-208
Well Number Permit No. / Aooroval No.
,~
29. Geologic Markers
Marker Name Measured True Vertical
Depth Depth
Top of Sag River 9230' 8750'
Shublik 'A' 9269' 8789'
Shublik 'B' 9328' 8847'
Shublik 'C' 9358' 8877'
Shublik 'D' 9379' 8898'
Ivishak 9418' 8937'
TZ4A 9474' 8992'
41N 9518' 9036'
OWC 9543' 9060'
TZ3 9572' 9089'
31. List of Attachments:
INSTRUCTIONS
,~
30.
Formation Tests
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
MDT was ran, log supplied for detail.
D ~".. ll"'~ ~- ~ \ .! n'~ f'\
tit' ~,~ l· ¡~ ì d r LJ
u'\. ~"'" .; ¡.f.'.~",~ V ~.
~ ,- ,... "ct~
.' I . 'u ' ,
I -,-J L ~L
Alaska Oil & Gas Cons. CommlsSlO1
. Anchorage
Date OS"ICS·O~
Prepared By Name/Number:
Sondra Stewman, 564-4750
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
,~,
,~
Z-39 Core Description for State Completion Report, 03/07/02
One core, cut 150', 7127' to 7277', and recovered 150'.
7127' -7133.6': shale, dark brown gray, fissile, sandy near bottom of interval. (Kalubik
Formation)
7133.6' -7156.5': sandstone, medium-dark gray brown, quartz and glauconite framework
grains, well sorted, fine grained, poor to fair porosity and permeability, with mottled
medium-dark brown oil stain, patchy siderite cement; patchy fluorescence. (Kuparuk C)
7156.5'-7175': sandstone, dark brown gray, very fine grained to fine grained, moderately
well sorted, poor porosity and permeability, argillaceous, burrowed, very weak
fluorescence. (Kuparuk C)
7175' -7179': sandstone, medium gray brown, quartz and glauconite framework grains,
very fine to coarse grained, poorly-moderately sorted, highly bioturbated, poor porosity
and permeability, poor fluorescence. (Kuparuk C)
7179'-7224': thinly laminated sandstone (very fine to fine grained), siltstone, and shale;
thickest sandstone approximately l' thick; poor to fair porosity, medium brown oil stain,
fair to good fluorescence. (Kuparuk B and A)
7224' -7277': shale, with thin laminae of sandy siltstone, which diminish in thickness and
number going downward. (Miluveach Formation)
Z-39 Sidewall Core Summary for State Completion Report, 03110/02
Shot and recovered 45 of 45 sidewall cores.
5 in Ugnu 4 through Ugnu 1 sandstones, 3545' MD-4285' MD, dull gold fluorescence.
12 in Ugnu M sandstones, 4336' MD-4561' MD, dull gold to gold fluorescence.
8 in Ugnu N sandstones, 4589' MD-4684' MD, dull gold to yellow fluorescence.
20 in Schrader Bluff 0 sandstones, 4785' MD-5148' MD, dull gold to yellow
fluorescence.
8CÄ\'h\1EC~ ~~PR 2 ID 2005
File No : HOU-020239
Date: May 28,2002
Final Core Analysis Report
for
BPExploration (Alaska), Inc.
Z-39 Well ~Glj·~ ~()ð
Borealis Field
Prudhoe Bay, Alaska
)
)
CORE LAB ORA TORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
BP Exploration (Alaska), Inc. . CL File No.: HOU-020239
Z-39 Well Date: April ii, 2002
Borealis Field Analyst(s): RP, JH, LA
Prudhoe Bay, Alaska Core LaI:Ï
PETRDLEUK SERVICES
CMS-300 CONVENTIONAL PLUG ANAL YSIS
Net Confining Permeability b(He) Beta Alpha Grain
Sample Depth Stress Porosity Klinkenberg I Kair Density Footnote
Number (ft) (psig) % (mD) (psi) ft( -1) (microns) (g/cm3)
1.83 .0001 .0005 256.24 3.24E+17 1.49E+05 ------'
1 7134.50 800 3.168
1 7134.50 1660 ** ** ** ** ** 3.168 (1 )
2 7135.60 800 29.03 24.9 28.0 6.51 4.02E+08 3.23E+01 2.900
2 7135.60 1660 28.52 21.9 24.7 6.69 5.39E+08 3.81 E+01 2.900
3 7136.70 800 15.54 .078 .111 31.18 2.34E+12 5.75E+02 3.175
3 7136.70 1660 15.41 .073 .103 30.09 2.01 E+12 4.70E+02 3.175
4 7137.80 800 30.80 20.3 ' 22.9 6.96 3.76E+08 2.46E+01 3.097
4 7137.80 1660 30.42 18.0 20.5 7.20 4.66E+08 2.71 E+01 3.097
5 7138.60 800 17.92 26.1' 35.2 18.04 1.43E+09 1.20E+02 3.101
5 7138.60 1660 17.62 19.5 25.7 16.50 2.34E+09 1.48E+02 3.101
6 7139.30 800 27.34 31.1 35.8 7.82 3.52E+08 3.53E+01 3.040
6 7139.30 1660 26.97 24.7 28.5 7.70 4.45E+08 3.56E+01 3.040
7 7140.50 800 29.84 229 252' 4.70 3.31 E+07 2.45E+01 3.018
7 7140.50 1660 29.56 173 185 3.23 4.12E+07 2.30E+01 3.018
8 7141.30 800 34.56 460 471 1.03 8.62E+06 1.28E+01 2.940
8 7141.30 1660 34.23 431 443 1.17 9.76E+06 1.36E+01 2.940
~
9 7142.80 800 31.71 235 243. 1.56 2.30E+07 1.75E+01 3.030
9 7142.80 1660 31 .45 221 .229, 1.79 2.56E+07 1.83E+01 3.030
9V 7142.80 800 32.04 155 166 3.36 2.85E+07 1.43E+01 2.902
9V 7142.80 1660 31.59 143 154 3.44 3.37E+07 1.56E+01 2.902
10 7143.30 800 33.28 427 437 1.05 8.69E+06 1.20E+01 2.889
10 7143.30 1660 32.96 403 413 1.17 9.92E+06 1.29E+01 2.889
11 7144.60 800 26.06 169 179 2.96 3.01 E+07 1.64E+01 3.036
11 7144.60 1660 25.74 155 164 2.83 3.30E+07 1.65E+01 3.036
12 7145.50 800 29.23 134 142 2.65 2.76E+07 1.19E+01 2.919
12 7145.50 1660 28.83 126 133 2.63 3.15E+07 1.28E+01 2.919
12V 7145.50 800 28.19 105 112 3.23 2.45E+07 8.30E+00 2.962
FINAL REPORT Page 1 of 8
CORE LABORA TORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
BP Exploration (Alaska), Inc. . CL File No.: HOU-020239
Z-39 Well Date: April 11, 2002
Borealis Field Analyst(s): RP, JH, LA
Prudhoe Bay, Alaska Core LaI:Ï
PETRDLEUK SERVICES
CMS-300 CONVENTIONAL PLUG ANAL YSIS
Net Confining Permeability b(He) Beta Alpha Grain
Sample Depth Stress Porosity Klinkenberg I Kair Density Footnote
Number (ft) (psig) % (mD) (psi) ft( -1 ) (microns) (g/cm3)
105 3.31 2.73E+07 ~
12V 7145.50 1660 27.82 98.6 8.69E+00 2.962
13 7146.60 800 25.37 64.5 69.5 3.83 8.15E+07 1.69E+01 2.959
13 7146.60 1660 25.01 59.5 63.9 3.59 8.95E+07 1.72E+01 2.959
14 7147.50 800 25.57 29.4 32.5 5.37 2.55E+08 2.41 E+01 3.020
14 7147.50 1660 25.27 27.0 29.9 5.37 2.80E+08 2.44E+01 3.020
14V 7147.50 800 26.98 39.5 43.2 4.73 9.86E+07 1 .26E+01 2.930
14V 7147.50 1660 26.59 36.8 40.2 4.70 1.13E+08 1.35E+01 2.930
15 7148.60 800 24.82 6.06 7.23 10.86 2.39E+09 4.65E+01 3.060
15 7148.60 1660 24.49 5.20 6.23 11.15 2.49E+09 4.17E+01 3.060
15V 7148.80 800 32.09 65.1 71.1 4.53 9.36E+07 1.97E+01 2.990
15V 7148.80 1660 31 .49 60.4 65.9 4.53 1.04E+08 2.03E+01 2.990
16 7149.50 800 12.62 1.23 1.34 5.59 2.08E+11 8.14E+02 3.159
16 7149.50 1660 12.06 .617 ;703 8.61 4.49E+11 8.84E+02 3.159
17 7149.80 800 30.97 114 122 3.46 2.19E+07 8.06E+00 3.010
17 7149.80 1660 30.63 105 113 3.36 2.45E+07 8.34E+00 3.010
18 7150.80 800 30.48 81.5 88.0 3.91 4.16E+07 1.09E+01 2.939
~
18 7150.80 1660 30.13 74.8 80.7 3.84 4.61 E+07 1.11 E+01 2.939
19 7151.70 800 27.15 44.8 53.6, 9.90 4.91 E+08 7.09E+01 3.069
19 7151.70 1660 26.69 31.4 39.4 12.74 7.59E+08 7.70E+01 3.069
20 7152.40 800 28.67 159 171 3.40 4.45E+07 2.29E+01 2.847
20 7152.40 1660 28.28 148 159 3.46 5.07E+07 2.43E+01 2.847
21 7153.80 800 28.38 368 380 1.53 2.13E+07 2.52E+01 2.734
21 7153.80 1660 27.89 319 331 1.71 2.58E+07 2.65E+01 2.734
21V 7153.80 800 30.57 507 521 1.25 1.51 E+07 2.47E+01 2.756
21V 7153.80 1660 29.64 443 456 1.30 1.77E+07 2.52E+01 2.756
22 7154.70 800 24.74 312 335 3.49 3.13E+07 3.15E+01 2.934
22 7154.70 1660 24.35 281 305 3.96 3.55E+07 3.22E+01 2.934
FINAL REPORT Page 2 of 8
CORE LABORA TORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
BP Exploration (Alaska), Inc. . CL File No.: HOU-020239
Z-39 Well Date: April 11, 2002
Borealis Field Analyst(s): RP, JH, LA
Prudhoe Bay, Alaska wre Lab
PETJlDLEUK SERVICES
CMS-300 CONVENTIONAL PLUG ANAL YSIS
Net Confining Permeability b(He) Beta Alpha Grain
Sam pie Depth Stress Porosity Klinkenberg I Kair Density Footnote
Number (ft) (psig) % (mD) (psi) ft( -1) (microns) (g/cm3)
',,--
23 7155.50 800 22.10 32.7 36.1 5.27 5.06E+08 5.34E+01 2.723
23 7155.50 1660 21.66 28.8 31.7 5.16 6.27E+08 5.82E+01 2.723
24 7156.80 800 23.46 46.5 51.2 5.11 7.90E+07 1.18E+01 2.679
24 7156.80 1660 23.09 43.2 47.4 4.93 7.97E+07 1.11 E+01 2.679
25 7157.20 800 25.02 82.5 89.2 3.92 4.08E+07 1.09E+01 2.675
25 7157.20 1660 24.61 76.2 81.9 3.72 4.46E+07 1.10E+01 2.675
26 7158.20 800 23.41 39.4 45.2 7.59 1.58E+08 2.01 E+01 2.656
26 7158.20 1660 22.89 33.9 38.1 6.21 1.81 E+08 1.98E+01 2.656
27 7160.60 800 23.30 27.7 31.5 7.07 1.04E+08 9.28E+00 2.655
27 7160.60 1660 22.89 25.1 28.4 6.88 1.03E+08 8.33E+00 2.655
28 7161.60 800 22.99 21.2 24.6 8.32 3.28E+08 2.24E+01 2.655
28 7161.60 1660 22.55 19.1 22.1 8.05 3.09E+08 1 .91 E+01 2.655
28V 7161.60 800 22.21 18.8 21.3 6.93 2.29E+08 1.39E+01 2.648
28V 7161.60 1660 21.89 17.8 20.1 6.93 2.59E+08 1.49E+01 2.648
29 7162.60 800 22.16 15.5 18.1 9.12 3.50E+08 1.74E+01 2.656
29 7162.60 1660 21.74 13.7 16.0 8.70 3.42E+08 1.52E+01 2.656
~
30 7163.60 800 21.60 15.5 18.0 8.70 3.79E+08 1.89E+01 2.659
30 7163.60 1660 21.20 13.9 16.1 8.38 3.75E+08 1.68E+01 2.659
31 7164.60 800 23.92 41.9 46.5 5.54 7.75E+07 1.05E+01 2.659
31 7164.60 1660 23.52 38.7 42.8 5.30 8.01 E+07 1.00E+01 2.659
31V 7164.60 800 21.18 8.39 9.99 10.52 7.50E+08 2.03E+01 2.639
31V 7164.60 1660 20.83 7.71 9.16 10.42 9.06E+08 2.26E+01 2.639
32 7165.60 800 21.98 18.7 21.7 8.49 3.36E+08 2.02E+01 2.652
32 7165.60 1660 21.57 16.5 19.1 8.33 3.46E+08 1.84E+01 2.652
33 7166.60 800 22.07 21.2 24.2 7.37 2.45E+08 1.68E+01 2.658
33 7166.60 1660 21.69 19.5 22.1 7.12 2.52E+08 1.58E+01 2.658
34 7167.50 800 21.11 18.5 21.2 7.54 3.08E+08 1.84E+01 2.642
FINAL REPORT Page 3 of 8
CORE LA BORA TORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
BP Exploration (Alaska), Inc. . CL File No.: HOU-020239
Z-39 Well Date: April 11, 2002
Borealis Field Analyst(s): RP, JH, LA
Prudhoe Bay, Alaska Core LatÌ
PETRDLEUK SIRV![IS
CMS-300 CONVENTIONAL PLUG ANAL YSIS
Net Confining Permeability b(He) Beta Alpha Grain
Sample Depth Stress Porosity Klinkenberg I Kàir Density Footnote
Number (ft) (psig) % (mD) (psi) ft( -1) (microns) (g/cm3)
.--
34 7167.50 1660 20.71 16.7 19.0 7.51 2.88E+08 1.55E+01 2.642
34V 7167.50 800 22.09 20.0 22.6 6.77 2.54E+08 1.64E+01 2.641
34V 7167.50 1660 21.77 18.9 21.4 6.77 2.72E+08 1.67E+01 2.641
35 7168.70 800 23.98 55.9 61.0 4.56 5.00E+07 8.98E+00 2.659
35 7168.70 1660 23.63 52.9 57.6 4.44 5.29E+07 9.02E+00 2.659
36 7169.80 800 3.50 .0005 .0013 194.86 3.88E+16 5.46E+04 2.756
36 7169.80 1660 ** 2.756 (1 )
37 7170.60 800 4.14 .110 .120 6.35 1.28E+13 4.32E+03 2.763
37 7170.60 1660 3.94 .062 .069 8.62 2.63E+13 5.31 E+03 2.763
38 7171.60 800 25.08 82.0 87.7 3.41 3.55E+07 9.35E+00 2.666
38 7171.60 1660 24.79 78.9 84.4 3.45 3.81 E+07 9.70E+00 2.666
39 7172.50 800 22.58 31.0 34.3 5.55 1.30E+08 1.29E+01 2.656
39 7172.50 1660 22.28 29.6 32.8 5.60 1.39E+08 1.32E+01 2.656
39V 7172.50 800 20.53 6.05 7.30 11.58 1.61 E+09 3.14E+01 2.640
39V 7172.50 1660 20.22 5.54 6.66 11 .42 2.07E+09 3.71 E+01 2.640
40 7173.50 800 21.11 16.1 18.4 7.27 3.54E+08 1.83E+01 2.655 -
40 7173.50 1660 20.79 15.3 17.3 7.13 4.20E+08 2.06E+01 2.655
41 7174.60 800 21.28 17.5 19.8 6.69 4.55E+08 2.56E+01 2.665
41 7174.60 1660 20.91 16.5 18.6 6.60 5.41E+08 2.88E+01 2.665
42 7175.70 800 20.48 1.64 . 2.17 19.68 4.02E+10 2.09E+02 2.759
42 7175.70 1660 20.23 1.55 2.04 19.53 5.36E+10 2.65E+02 2.759
43 7176.50 800 10.59 .020 .038 76.17 3.11E+13 1.82E+03 2.993
43 7176.50 1660 10.38 .016 .033 80.48 4.36E+13 2.20E+03 2.993
44 7177.60 800 17.52 1.15 1.48 17.41 1.21E+11 4.43E+02 2.690
44 7177.60 1660 17.07 .938 1.21 17.79 2.35E+11 7.01 E+02 2.690
44V 7177.60 800 16.65 .174 .271 39.35 3.00E+11 1.65E+02 2.689
44V 7177.60 1660 16.10 .092 .160 52.05 1.23E+12 3.61 E+02 2.689
FINAL REPORT Page 4 of 8
CORE LABORA TORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
BP Exploration (Alaska), Inc. . CL File No.: HOU-020239
Z-39 Well Date: April 11, 2002
Borealis Field Analyst( s): RP, JH, LA
Prudhoe Bay, Alaska Core Lab
PF'!ROLEUK SERYJ[ES
CMS-300 CONVENTIONAL PLUG ANAL YSIS
Net Confining Permeability b(He) Beta Alpha Grain
Sample Depth Stress Porosity Klinkenberg I Kair Density Footnote
Number (ft) (psig) % (mD) (psi) ft( -1) (microns) (g/cm3)
'-
45 7178.70 800 16.98 4.62 5.66 12.83 1.46E+10 2.17E+02 2.638
45 7178.70 1660 16.31 2.33 2.88 13.55 5.69E+10 4.27E+02 2.638
46 7187.30 800 23.73 128 139 3.96 1.58E+07 6.54E+00 2.667
46 7187.30 1660 23.50 126 136 3.94 1.67E+07 6.81 E+OO 2.667
47 7192.20 800 20.89 32.7 36.9 6.70 3.30E+07 3.48E+00 2.643
47 7192.20 1660 20.68 31.8 36.0 6.73 3.71 E+07 3.81 E+OO 2.643
48 7194.20 800 ** ** ** 2.644 (1 )
48 7194.20 1660 ** ** ** ** 2.644 (1 )
49 7197.40 800 22.01 3.81 4.94 17.19 2.21 E+09 2.71 E+01 2.636
49 7197.40 1660 21.69 3.62 4.70 17.26 2.39E+09 2.80E+01 2.636
50 7198.60 800 17.21 2.18 2.57 10.71 1.07E+11 7.47E+02 2.637
50 7198.60 1660 16.84 1.43 1.78 14.59 1.81E+11 8.30E+02 2.637
Footnotes:
~
(1) : Sample permeability less than 0.0005 mO. Unable to obtain measurement at this pressure.
FINAL REPORT Page 5 of 8
CORE LABORA TORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
BP Exploration (Alaska), Inc. . CL File No.: HOU-020239
Z-39 Well Date: April 11, 2002
Borealis Field Analyst(s): RP, JH, LA
Prudhoe Bay, Alaska . Core LaI:Ï
PETJlDLEUK SERVICES
DEAN STARK FLUID SATURATIONS
Viscosity Extracted 1660 psig NCS ++
Sample Depth 122jF Pycnometer Oil Wt Kinf I Kair Porosity Sco Stw Refract
Number (ft) (cp) APlo (g) (mD) (%) (%) (%) APlo
~'
1 7134.50 0.01 (1) (1 ) (1 ) N/A N/A
2 7135.60 140 17.6 0.18 21.9 24.7 28.52 24.5 58.2 33
3 7136.70 0.02 .073 .103 15.41 0.0 90.1
4 7137.80 130 17.5 0.22 18.0 20.5 30.42 30.8 51.2 33
5 7138.60 ** 0.01 19.5· 25.7 17.62 31.2 62.3 **
6 7139.30 171 16.6 0.23 24.7 28.5 26.97 21.1 65.0 33
7 7140.50 149 16.9 0.22 173 185 29.56 30.1 47.3 32
8 7141.30 238 16.2 0.36 431 443 34.23 33.6 43.6 32
9 7142.80 305 16.1 0.33 221 229 31 .45 32.5 47.8 32
9V 7142.80 + + + 143 154 31.59 34.7 48.2
10 7143.30 343 16.4 0.26 403 413 32.96 35.6 41.1 32
11 7144.60 385 15.7 0.14 155 164 25.74 36.5 48.3 32
12 7145.50 740 15.0 0.25 126 133 28.83 40.3 44.3
12V 7145.50 + + + 98.6 105 27.82 40.8 42.1
13 7146.60 323 15.8 0.08 59.5 63.9 25.01 35.2 46.7
14 7147.50 810 14.9 0.29 27.0 29.9 25.27 37.9 45.7 31 -
14V 7147.50 + + + 36.8 40.2 26.59 37.7 45.0
15 7148.60 1743 13.0 0.24 5.20 6.23 24.49 29.8 60.2 29
15V 7148.80 + + + 60.4 65.9 31 .49 55.2 29.2
16 7149.50 0.02 .617 .703 12.06 21.8 59.5 **
17 7149.80 1141 13.4 0.32 105 113 30.63 42.8 42.1 **
18 7150.80 4222 12.5 0.30 74.8 80.7 30.13 32.2 53.3
19 7151.70 2254 0.06 31.4 39.4 26.69 36.3 50.2 29
20 7152.40 88000 <10.0 0.18 148 159 28.28 41.4 45.8
21 7153.80 72000 <10.0 0.28 319 331 27.89 62.4 34.3 17
21V 7153.80 + + + 443 456 29.64 48.2 37.7
22 7154.70 119000 <10.0 0.20 281 305 24.35 53.4 38.5 16
FINAL REPORT Page 6 of 8
CORE LA BORA TORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
BP Exploration (Alaska), Inc. . CL File No.: HOU-020239
Z-39 Well Date: April 11, 2002
Borealis Field Analyst(s): RP, JH, LA
Prudhoe Bay, Alaska Core LaI:Ï
PETRDLEUK SERVICES
DEAN STARK FLUID SATURATIONS
Viscosity Extracted 1660 psig NCS ++
Sam pie Depth 122jF Pycnometer Oil Wt Kinf I Kair Porosity Sco Stw Refract
Number (ft) (cp) APlo (g) (mD) (%) (%) (%) APlo
~
23 7155.50 136000 <10.0 0.20 28.8 31.7 21.66 43.3 49.8 19
24 7156.80 134500 <10.0 0.36 43.2 47.4 23.09 63.0 27.2 21
25 7157.20 147000 <10.0 0.18 76.2 81.9 24.61 61.7 29.8 **
26 7158.20 135000 <10.0 0.20 33.9 38.1 22.89 55.3 34.0 19
27 7160.60 >150000 <10.0 0.46 25.1 28.4 22.89 61.5 32.4 21
28 7161.60 >150000 <10.0 0.46 19.1 22.1 22.55 60.8 32.1 16
28V 7161.60 + + + 17.8 20.1 21.89 65.2 30.6
29 7162.60 >150000 <10.0 0.25 13.7 16.0 21.74 59.8 34.6 15
30 7163.60 >150000 <10.0 0.34 13.9 16.1 21.20 59.9 34.9 18
31 7164.60 >150000 <10.0 0.35 38.7 42.8 23.52 64.3 30.3 19
31V 7164.60 + + + 7.71 9.16 20.83 60.9 35.8
32 7165.60 >150000 <10.0 0.28 16.5 19.1 21.57 59.6 34.0 21
33 7166.60 >150000 <10.0 0.34 19.5 22.1 21.69 61.6 32.9 19
34 7167.50 >150000 <10.0 0.29 16.7 19.0 20.71 58.1 34.8 19
34V 7167.50 + + + 18.9 21.4 21.77 65.2 32.9
35 7168.70 >150000 <10.0 0.28 52.9 57.6 23.63 65.2 30.8 17 -j
36 7169.80 2276 ** 0.04 (1) (1 ) (1 ) N/A N/A **
37 7170.60 ** 0.02 .062 .069 3.94 19.2 27.0 **
38 7171.60 >150000 <10.0 0.34 78.9 84.4 24.79 67.6 28.5 18
39 7172.50 >150000 <10.0 0.25 29.6 32.8 22.28 59.1 32.3 19
39V 7172.50 + + + 5.54 6.66 20.22 39.2 55.0
40 7173.50 >150000 <10.0 0.23 15.3 . 17.3 20.79 30.7 42.7 21
41 7174.60 >150000 <10.0 0.22 16.5 18.6 20.91 47.1 44.9 19
42 7175.70 95000 <10.0 0.23 1.55 2.04 20.23 51.9 42.0 21
43 7176.50 0.03 .016 .033 10.38 3.4 71.8 **
44 7177.60 116000 0.09 .938 1.21 17.07 42.1 33.9
44V 7177.60 + + + .092 .160 16.10 51.3 39.1
FINAL REPORT Page 7 of 8
CORE LAB ORA TORIES, INC.
HOUSTON ADVANCED TECHNOLOGY CENTER
BP Exploration (Alaska)," Inc.
Z-39 Well
Borealis Field
Prudhoe Bay, Alaska
.
Core! LaI:Ï
PETRDLEUK SERVICES
CL File No.: HOU-020239
Date: April 11, 2002
Analyst(s): RP, JH, LA
DEAN STARK FLUID SATURATIONS
Viscosity Extracted 1660 psig NCS ++
Sam pie Depth 122jF Pycnometer Oil Wt Kinf I Kair Porosity Sco Stw Refract
Number (ft) (cp) APlo (g) (mD) (%) (%) (%) APlo
---
45 7178.70 ** 0.05 2.33 2.88 16.31 65.2 17.3 **
46 7187.30 14130 <10.0 0.31 126 136 23.50 67.0 15.8
47 7192.20 9420 <10.0 0.24 31.8 36.0 20.68 60.3 14.0 23
48 7194.20 3825 12.1 0.19 (1 ) (1) (1 ) N/A N/A 24
49 7197.40 324 15.5 0.20 3.62 4.70 21.69 40.4 41.0 23
50 7198.60 155 17.1 0.10 1.43 1.78 16.84 38.8 52.2 22
Footnotes :
(1) : Sample permeability less than 0.0005 mO. Unable to obtain measurement at this pressure.
+ : Viscosity / gravity measurements not attempted on vertically oriented samples.
** : Insufficient sample for measurement.
++ : Gravity measurement obtained using refractometer on oil retorted from sample end trims at 12000 F.
"-"
FINAL REPORT Page 8 of 8
2,188 (psi) 4.17 (ppg)
4,335 (psi) 9.47 (ppg)
)
)
-
Printed: 3/18/2002 1:50:22 PM
660 (psi
400 (psi
9.90 (ppg)
8.60 (ppg)
2,972.0 (ft)
8,808.0 (ft)
3,058.0 (ft)
9,308.0 (ft)
3/3/2002 FIT
3/15/2002 I FIT
,~
,~,
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Z-39
Z-39
DRILL +COMPLETE
DOYON
DOYON 14
Start: 2/25/2002
Rig Release: 3/17/2002
Rig Number:
Spud Date: 2/20/2002
End: 3/17/2002
2/22/2002 15:00 - 00:00 9.00 MOB P PRE LD top drive. Prepare to LD derrick. Cantilever floor into
position. Move camp from NK 11A to Z 39
2/23/2002 00:00 - 00:00 24.00 MOB P PRE Finish moving camp and shop to Z pad. Raise C-section. Jack
rig floor back. LD wind walls. LD derrick and A legs. Hold pre
move safety meeting with security, CPS, rig, and trucking
personnel. Move rig off Niakuk pad. Rig is currently moving on
the West Dock road just north of the Oxbow road.
2/24/2002 00:00 - 23:00 23.00 MOB P PRE Continue to move rig to Z pad, Arrive at Z pad.
23:00 - 00:00 1.00 MOB P PRE Raise derrick and drive pins.
2/25/2002 00:00 - 06:00 6.00 RIGU P PRE Raise wind walls. Remove boosters. Put heater in cellar. Put
on cellar doors. Hang diverter in cellar.
06:00 - 08:30 2.50 RIGU P PRE Spot rig over Z-39. Skid rig floor.
08:30 - 11 :30 3.00 RIGU P PRE Unbridal and tie back bridal lines in derrick. Remove wheels
from blocks.
11 :30 - 16:00 4.50 RIGU P PRE PU top drive. RU rig floor.
16:00 - 18:00 2.00 RIGU P PRE RU top drive. Take on spud mud. Accept rig at 18:00 hrs.
18:00 - 00:00 6.00 RIGU P PRE Install diverter. NU surface stack.
2/26/2002 00:00 - 01 :00 1.00 RIGU P PRE Continue to NU diverter system. Load pipe shed with DP and
strap.
01 :00 - 02:00 1,00 RIGU P PRE Slip and cut drilling line.
02:00 - 03:00 1.00 DRILL P SURF Strap DP and HWDP,
03:00 - 07:00 4.00 DRILL P SURF PU 4" DP and stand back in derrick.
07:00 - 09:00 2.00 DRILL P SURF PU HWDP and flex collars and stand back in derrick.
09:00 - 10:30 1.50 DRILL P SURF MU mud motor, MWD, flex collars, string stabilizer, XO, HOC.
Adjust motor bend to 1.5 deg. MU bit.
10:30 - 11 :30 1,00 DRILL P SURF Pre spud meeting. Function test diverter.
11:30-12:00 0.50 DRILL P SURF Fill hole with mud and check for leaks. Gasket on bottom of
riser leaking.
12:00 - 14:00 2.00 DRILL N RREP SURF Replace gasket on bottom of riser.
14:00 - 15:30 1.50 DRILL P SURF Install probes in MWD.
15:30 - 21 :00 5,50 DRILL P SURF Drill from 113' to 345'. ART= 1,69hrs. Not getting directional
data from MWD tool. Gamma data is OK.
21 :00 - 21 :30 0.50 DRILL N DFAL SURF POH to change out MWD.
21 :30 - 22:00 0.50 DRILL N DFAL SURF Change out MWD probes and pulser.
22:00 - 23:00 1.00 DRILL N DFAL SURF RIH. Test MWD at 250' - OK.
23:00 - 00:00 1,00 DRILL N DFAL SURF Continue to RIH to 300'. Tagged bridge. Picked up until free.
Started to circulate and rotate and the hole got tight. Worked
DP free. Back reamed to 250', then reamed back to bottom.
2/27/2002 00:00 - 01 :30 1.50 DRILL P SURF Drill from 345' to 433'.
01 :30 - 02:00 0.50 DRILL N HMAN SURF Circulate and flush surface lines.
02:00 - 03:00 1.00 DRILL N DFAL SURF Trouble shoot MWD detection problems.
03:00 - 07:00 4.00 DRILL P SURF Drill from 433' to 793'.
07:00 - 09:00 2.00 DRILL P SURF Change out top drive saver sub to 4" HT-38.
09:00 - 19:30 10.50 DRILL P SURF Drill from 793' to 1,848'.
19:30 - 20:00 0.50 DRILL P SURF Circulate around sweep.
20:00 - 21 :00 1,00 DRILL P SURF Short trip to 800'. 25K over pulls at 1,360,1.150, and 1,085' to
1,000'. Back reamed two stands from 1,175' to 986'.
21 :00 - 22:00 1.00 DRILL P SURF TIH. Reamed tight hole from 1,243' to 1,339'. and 1,371' to
1,465'. RIH and wash last stand to bottom.
22:00 - 00:00 2.00 DRILL P SURF Drill from 1,848' to 2,137'.
2/28/2002 00:00 - 09:00 9.00 DRILL P SURF Drill from 2,137' to 3,038', casing point. AST=3.46, ART=2.35.
Dropped mud viscosity to 150 sectqt below the gravels.
09:00 - 10:00 1.00 DRILL P SURF CBU with sweep.
Printed: 3/18/2002 1:50:32 PM
~
.'~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
2-39
2-39
DRILL +COMPLETE
DOYON
DOYON 14
Start: 2/25/2002
Rig Release: 3/17/2002
Rig Number:
Spud Date: 2/20/2002
End: 3/17/2002
2/28/2002 10:00 - 11 :00 1.00 DRILL P SURF Short trip to 1,745'. Tight spots from 1,950' to 1,840'.
11 :00 - 12:00 1.00 DRILL P SURF RIH. Wash tight spots from 1,830' to 1,950'.
12:00 - 14:30 2.50 DRILL P SURF Pump sweep. Condition mud to 100 sec/qt funnel viscosity.
14:30 - 17:00 2.50 DRILL P SURF Flow check. Well static. Drop Sperry Sun ESS, POH with no
adverse hole conditions.
17:00 - 18:30 1,50 DRILL P SURF LD BHA.
1B:30 - 21 :00 2.50 DRILL P SURF RU to run 9 51B" casing. Perform dummy run with landing joint.
21 :00 - 00:00 3.00 DRILL P SURF P/U shoe track and check floats. Run 9 5IB", 40#, L-80, BTC
casing. Fill casing on the run with "Franks Tool".
3/1/2002 00:00 - 01 :30 1.50 CASE P SURF Continue to run 9 5/8" casing.
01 :30 - 02:00 0.50 CASE P SURF MU landing joint and land casing.
02:00 - 03:00 1.00 CASE P SURF Circulate and condition mud. Stage rate up to 9 bpm.
Reciprocate casing.
03:00 - 04:00 1.00 CASE P SURF RD franks fill up tool. RU cement head.
04:00 - 05:00 1.00 CASE P SURF Circulate and condition mud. Reciprocate casing.
05:00 - 07:30 2.50 CASE P SURF Test lines to 4,000 psi. Pump 10 bbls CW-100, 73 bbls 10.4
ppg mud push spacer, 349 bbls 10.7 ppg Arctic set lite lead
cement, 46 bbls 15.B ppg class G tail cement. Displace with
rig pumps at 9 bpm. Bump plug on calculated strokes. No
cement to surface.
07:30 - OB:30 1.00 CASE P SURF Check floats. RD cement head and casing tools. Prepare for
second stage job with TAM shifting tool. Back out split landing
joint.
08:30 - 10:00 1.50 CASE P SURF MU TAM combo tool and RIH to port collar.
10:00 - 12:30 2,50 CASE P SURF Circulate out cement from annulus through port collar at 20 to
50 spm, 100 to 200 psi.
12:30 - 14:00 1.50 CASE P SURF Test lines to 3,000 psi. Pump 20 bbls water, 188 bbls 10.7 ppg
Arctic set lite cement, displace cement to port collar.
14:00 - 14:30 0.50 CASE P SURF Release from port collar and circulate out 4" x 9 5/8" annulus at
60 spm, 150 psi.
14:30 - 15:00 0,50 CASE P SURF Rinse stack with water and drain.
15:00 - 16:00 1.00 CASE P SURF POH and LD port collar tool.
16:00 - 17:00 1.00 CASE P SURF LD landing joint.
17:00 - 18:30 1.50 CASE P SURF ND surface stack and diverter line.
18:30 -19:30 1.00 CASE P SURF Install casing and tubing spool and test to 1,000 psi for 10
minutes.
19:30 - 22:00 2.50 CASE P SURF NU BOP.
22:00 - 23:00 1.00 CASE P SURF RU to test BOP.
23:00 - 00:00 1.00 CASE P SURF Test BOPE to BP policy and AOGCC regulations. Witness of
test by Chuck Schieve of AOGCC.
3/2/2002 00:00 - 05:00 5.00 CASE P SURF Continue to test BOPE to 250 I 3,500 psi as per BP policy and
AOGCC regulations. Perform high pressure test for 5 minute
duration.
05:00 - 05:30 0.50 DRILL P INT1 Set wear ring.
05:30 - 06:30 1.00 DRILL P INT1 Test casing to ensure port collar is closed prior to PU drilling
assembly. Flush clabbered mud from mud pump lines.
06:30 - 07:00 0,50 DRILL P INT1 RU to PU 4" drill pipe from pipe shed.
07:00 - 13:00 6,00 DRILL P INT1 PU DP from pipe shed and stand back in derrick.
13:00 - 15:00 2.00 DRILL P INT1 MU BHA.
15:00 - 15:30 0.50 DRILL P INT1 Upload MWD.
15:30 - 16:30 1.00 DRILL P INT1 Continue to MU BHA.
16:30 - 17:00 0,50 DRILL P INT1 PU DP from pipe shed and RIH. Rotate past port collar at
1,074'.
Printed: 3/18/20D2 1 :50:32 PM
,~
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Z-39
Z-39
DRILL +COMPLETE
DOYON
DOYON 14
Start: 2/25/2002
Rig Release: 3/17/2002
Rig Number:
Spud Date: 2/20/2002
End: 3/17/2002
3/212002 17:00 - 18:00 1.00 DRILL N DFAL INT1 Flow test MWD at various flow rates. No signal from MWD.
18:00 - 19:00 1.00 DRILL N DFAL INT1 POH. Stand back BHA.
19:00 - 19:30 0.50 DRILL N DFAL INT1 Inspect port on PBL sub to ensure port is closed, OK. LD PBL
and flow test MWD, Still no signal.
19:30 - 21 :00 1.50 DRILL N DFAL INT1 Plug in and test MWD tools. Trouble shoot MWD. Replace
pulser and TM. Upload to MWD.
21 :00 - 21 :30 0.50 DRILL N DFAL INT1 Flow test MWD. Still no signal from MWD.
21 :30 - 23:00 1.50 DRILL N DFAL INT1 Trouble shoot MWD.
23:00 - 00:00 1.00 DRILL N DFAL INT1 Change out MWD, PM, DGR & EWR
3/3/2002 00:00 - 03:00 3.00 DRILL N DFAL INT1 Change out MWD tools, PM, TM, pulser, DGR I EWR Load
MWD and confindence test. Orient motor to MWD scribe line.
Check bit, OK.
03:00 - 03:30 0.50 DRILL N DFAL INT1 RIH with DCs, PBL, Jars, HWDP.
03:30 - 04:00 0,50 DRILL N DFAL INT1 Change elevators. RIH wI 4" DP to 1,122'. Rotate past port
collar at 1,074'.
04:00 - 04:30 0.50 DRILL P INT1 Test Tam port collar to ensure closed after running past with bit
and bent housing motor. Shallow test MWD.
04:30 - 05:30 1,00 DRILL P INT1 PU 4" DP from shed.
05:30 - 06:00 0.50 DRILL P INT1 RIH with DP from derrick. Wash down last stand and tag
cement above plugs at 2,931'.
06:00 - 07:30 1.50 DRILL P INT1 CBU while slipping and cutting drilling line. Service top drive.
07:30 - 08:30 1.00 DRILL P INT1 Test casing to 3,500 psi for 30 minutes. Record on chart.
08:30 - 10:00 1,50 DRILL P INT1 Drill cement, float equipment, and 20' of new hole to 3,058'.
Displace well bore on the fly. SPR
10:00 - 10:30 0.50 DRILL P INT1 CBU at 12 bpm, 2,000 psi.
10:30 - 12:00 1.50 DRILL P INT1 Perform FiTtest to 14.17 ppg EMW (660 psi surface pressure,
2,972' TVD, 9.9 ppg mud).
12:00 - 12:30 0.50 DRILL P INT1 PJSM. Discuss FIT wI Anchorage.
12:30 - 00:00 11.50 DRILL P INT1 Drill 8.75" hole to 4,345'. AST=0.25, ART=6.65.
3/4/2002 00:00 - 00:30 0.50 DRILL P INT1 Drill from 4,345' to 4,441'. ART=.5.
00:30 - 01 :00 0.50 DRILL P INT1 Circulate bottoms up, Flow check. Well static.
01 :00 - 02:30 1.50 DRILL P INT1 Short trip to 3,003'. 20K to 25K over pull from 3,150' to 3,050'.
Wiipe and come back through slick. No swabbing on trip. RIH
wlo problems.
02:30 - 18:30 16.00 DRILL P INT1 Drill from 4,441' to 5,784'.
18:30 - 19:00 0,50 DRILL P INT1 Pump sweep surface to surface.
19:00 - 21 :00 2.00 DRILL P INT1 Short trip to 4,345'. Hole in good shape. RIH.
21 :00 - 00:00 3.00 DRILL P INT1 Drill from 5,784' to 6,000'. Drilling times from 12:00 to
midnight: AST=0.91, ART= 5.73.
3/5/2002 00:00 - 12:00 12.00 DRILL P INT1 Directional drill from 6,000' to 6,647' Back ream all
connections. Hole in good shape,
ART 8.41, AST .41, ADT 8.82
12:00 - 21 :30 9.50 DRILL P INT1 Directional drill from 6,647' to 7,127' Pump sweeps every
500 ft, or as hole dictates,
ART 6,84, AST .58, ADT 7.42
21 :30 - 22:30 1.00 DRILL P INT1 Circulate sweep, bottoms up
22:30 - 00:00 1.50 DRILL P INT1 Pump dry job, flow check, trip out to shoe with no adverse
hole conditions,
3/6/2002 00:00 - 01 :30 1.50 DRILL P INT1 Wiper trip to 3000', inside casing shoe, wellbore in good
condition
01 :30 - 03:30 2.00 DRILL P INT1 Slip I cut drilling line, service top drive
03:30 - 06:00 2.50 DRILL P INT1 Clean mud tanks, mud lines, take on core mud
06:00 - 07:30 1.50 DRILL P INT1 Trip in, fill pipe at 5000', wash last stand down
Printed: 3/18/2002 1 :50:32 PM
~,
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Z-39
Z-39
DRILL +COMPLETE
DOYON
DOYON 14
Start: 2/25/2002
Rig Release: 3/17/2002
Rig Number:
Spud Date: 2/20/2002
End: 3/17/2002
3/612002
07:30 - 08:00
08:00 - 11 :30
11 :30 - 12:00
12:00 - 15:30
15:30 - 16:30
16:30 - 17:00
17:00 - 17:30
17:30 - 20:30
20:30 - 23:30
3/7/2002
23:30 - 00:00
00:00 - 01 :00
01 :00 - 05:00
05:00 - 06:30
06:30 - 10:00
10:00 - 13:00
13:00 - 13:30
13:30 - 16:30
16:30 - 17:00
17:00 - 17:30
17:30 - 18:30
18:30 - 21:00
21 :00 - 22:30
22:30 - 00:00
3/8/2002
00:00 - 00:30
00:30 - 02:00
02:00 - 03:00
03:00 - 05:00
05:00 - 06:00
06:00 - 06:30
06:30 - 07:30
07:30 - 12:00
12:00 - 12:30
12:30 - 17:00
17:00 - 18:00
18:00 - 18:30
18:30 - 20:30
20:30 - 21 :00
0.50 DRILL P
3.50 DRILL P
INT1
INT1
0.50 DRILL P
3.50 DRILL P
1.00 DRILL P
0.50 DRILL P
0.50 DRILL P
3.00 DRILL P
3.00 DRILL P
INT1
INT1
INT1
INT1
INT1
INT1
INT1
0.50 DRILL P
1.00 DRILL P
INT1
INT1
4.00 DRILL P
1.50 DRILL P
3.50 DRILL P
3.00 DRILL P
0.50 DRILL P
3,00 DRILL P
0.50 DRILL P
0.50 DRILL P
1.00 DRILL P
2.50 DRILL P
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
1,50 DRILL P
INT1
1.50 DRILL P
INT1
0.50 DRILL P
INT1
1.50 DRILL P
INT1
1.00 DRILL P
INT1
2.00 DRILL P
1.00 DRILL P
INT1
INT1
0.50 DRILL P
1,00 DRILL P
4.50 DRILL P
INT1
INT1
INT1
0.50 DRILL P
4,50 DRILL P
INT1
INT1
1.00 DRILL P
0,50 DRILL P
2.00 DRILL P
INT1
INT1
INT1
0.50 DRILL P
INT1
Circulate wellbore with old mud
Displace wellbore mud, pump 80 bbl high vis spacer,
displace wI 4 % KCL coring fluid, 13 bpm at 3900 psi
Survey wI MWD, flow check, pump dry job,
Trip out, drop 2" rabbit, wellbore in good condition
Rack back BHA
Down load MWD, LD pulser
LD directional BHA
PJSM, PU, MU, core BHA, Baker Inteq
Trip in core BHA, fill pipe at shoe and 5000'. Wash down
last stand. Hole in good shape--no adverse hole conditions or
fill.
Circulate bottoms up, drop ball, take pump rates
Circulate bottoms up, drop ball, establish drilling
parameters
Cut core # 1, from 7,127' to 7,277' ART 3.75
Circulate bottoms up, flow check, pump dry job
Trip out core BHA, control speed as per BP ROPs
PJSM 1 stand from surface. Trip out BHA as per BP ROPs
Rack back BHA
LD inner core barrels
LD outer core barrels
LD core hand tools
PU, MU, drilling BHA
Trip in, fill pipe 3000', 5000', wash down last stand,
Wellbore in good condition
Ream rat hole from 7127' to 7277'
ADT 1. Add 1 % of Lubetex while circulating.
Rotary drill 8 3/4" wellbore from 7277' to 7344'
ADT 1.33
Rotary drill 83/4" wellbore from 7,344' to 7,377' ADT
0.65
Circulate sweep from surface to surface, 40 % increase at
shakers during bottoms up
Wiper trip, 5 stands, wellbore tight and sticky on second,
third, fourth stands out, run back to bottom, trip out, no
overpull, wellbore in good condition
Trip out drilling BHA, dropped 2.2" rabbit
Change elevators, rack back HWDP, jars, LD DCs, near
bir stab, float sub, bit
Clean rig floor
PJSM, rig up wireline, pick up tools, load sources
Log # 1, Platform, PEX I BHCS, run to 7,302'.( Unable to
get to bottom @ 7374.)
Change out logging tools
Log # 2, CMR Plus, run from 7,302' to 7,100', from 5,200'
to 4,300'
Rig down, lay down CMR tools, function blind rams
PJSM, drillpipe conveyed logging tools
Log # 3, MDT, rig up, PU, MU, MDT drillpipe conveyed
logging tools
Surface test same
LD jars, run in HWDP
Printed: 3118/2002 1 :50:32 PM
r----.
,~,
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Z-39
Z-39
DRILL +COMPLETE
DOYON
DOYON 14
Start: 2/25/2002
Rig Release: 3/17/2002
Rig Number:
Spud Date: 2/20/2002
End: 3/17/2002
3/812002
21 :00 - 22:30
22:30 - 23:30
3/9/2002
23:30 - 00:00
00:00 - 00:30
00:30 - 01 :00
01 :00 - 02:30
3/10/2002
02:30 - 06:30
06:30 - 12:00
12:00 - 00:00
00:00 - 05:00
05:00 - 05:30
05:30 - 06:30
06:30 - 09:30
09:30 - 10:00
10:00 - 11 :30
11 :30 - 14:00
14:00 - 15:00
15:00 - 15:30
15:30 -16:00
16:00 - 19:30
3/11/2002
19:30 - 00:00
00:00 - 03:00
03:00 - 03:30
03:30 - 04:00
04:00 - 06:00
06:00 - 07:00
07:00 - 08:00
08:00 - 09:00
09:00 - 10:00
10:00 - 10:30
10:30 - 12:00
12:00 - 13:00
13:00 - 13:30
13:30 - 00:00
3/12/2002
00:00 - 12:00
12:00 - 21 :30
21 :30 - 23:30
1.50 DRILL P
1.00 DRILL P
0.50 DRILL P
0.50 DRILL P
0,50 DRILL P
1.50 DRILL P
4.00 DRILL P
5.50 DRILL P
12.00 DRILL P
5.00 DRILL P
0.50 DRILL P
1.00 DRILL P
3,00 DRILL P
0.50 DRILL P
1.50 DRILL P
2.50 DRILL P
1.00 DRILL P
0.50 DRILL P
0,50 DRILL P
3.50 DRILL P
4.50 DRILL N
3.00 DRILL N
0.50 DRILL P
0.50 DRILL P
2.00 DRILL P
RREP INT1
RREP INT1
INT1
INT1
INT1
1.00 DRILL P
1.00 DRILL P
1.00 DRILL P
1.00 DRILL P
0.50 DRILL P
1.50 DRILL P
1.00 DRILL P
0.50 DRILL P
10.50 DRILL P
12.00 DRILL P
9,50 DRILL P
2.00 DRILL P
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
RIH wI 4" drillpipe
Circulate at casing shoe, 3 bpm at 190 psi
Rig up wire line sheaves in derrick
Trip logs in to open hole slow as per BP ROPs
Trip in MDT log from 3891' to 4323'
Circulate at 3 bpm, 250 psi
PJSM, MU side entry sub, pump down PWCH, latch,
confirm latch, test tools, install cable clamp, hang snatch
block
Trip in MDT from 4323' to 7220'
Log wI MDT tool, from 7220' to 5157'
Log wI MDT tool, from 5157' to 4790'
Drillpipe conveyed MDT from 4790' to 4399'
PJSM, Trip out to side entry sub
PJSM, Unlatch, retrieve wireline, LD side entry sub, LD
XIOs, pump dry job
Trip out to 700'
Rack back HWDP, LD 2 jts
LD MDT tools
PJSM, PU, MU, Wireline sidewall core tool, RIH, shoot
same, trip out, LD tools
Rig down wireline, sheaves and tools
Pull wear bushing
Run test plug
Pressure test BOPE as per AOGCC I BP regulations
Test witness waived by AOGCC John Crisp
Rig repair, replace disc brake on top drive
Rig repair, disk brake on top drive
Pressure test blind rams as per AOGCC I BP regulations
Run wear bushing
PU, MU, directional BHA, load MWD, run jars, HWDP,
shallow test MWD
Trip in to 3384', break circulation, check shot
Rig service, slip I cut drilling line
circulate wellbore at 10 bpm, 1480 psi
Trip in to 5400'
Circulate bottoms up at 9 bpm, 1790 psi
Trip in to 7120'
Circulate wellbore, MAD pass from 7120' to 7311'
Circulate wellbore to bottom, tag at 7377', pump sweep,
work bottom for junk
Control drill from 7377' to 7407', work wellbore for junk
Directional drill from 7407' to 8132', TVD 7672'
ART 6.85, AST 0.75, ADT 7.6
Directional drill 83/4" wellbore from 8132' to 8840'
ART 10.41, ADT 10.41
Directional drill from 8840' to 9288', control drill in 30'
sections
from 9136' to 9288'
ART 6.35, ADT 6.35
MWD detection problems wI 2 pumps on, log wI MWD,
MAD pass after every 30' section drilled wI 1 pump
Wiper trip, back to 6734', tight at 7160' to 6991'
Printed: 3/18/2002 1 :50:32 PM
~
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
2-39
2-39
DRILL +COMPLETE
DOYON
DOYON 14
Start: 2/25/2002
Rig Release: 3/17/2002
Rig Number:
Spud Date: 2/20/2002
End: 3/17/2002
3/12/2002 21 :30 - 23:30 2.00 DRILL P INT1 Top of TKUP I CM2 to top of THRZ
23:30 - 00:00 0.50 DRILL P INT1 Trip in wellbore
3/13/2002 00:00 - 01 :00 1,00 DRILL P INT1 Wiper trip, RIH, wash down last stand
01 :00 - 02:30 1.50 DRILL P INT1 Circulate weighted sweep from surface to surface
3600 psi at 11 bpm
02:30 - 03:30 1.00 DRILL P INT1 Circulate casing pill, LCM pill into annulus, flow cheek
03:30 - 04:00 0,50 DRILL P INT1 Flow check, trip out 5 stands, pump dry job
04:00 - 07:30 3.50 DRILL P INT1 Trip out from 8850' to 800', wellbore in good condition
07:30 - 10:00 2.50 DRILL P INT1 LD HWDP, jars, Flex DCs, down load MWD, LD mwd,
motor, bit
10:00 - 10:30 0.50 DRILL P INT1 Clean rig floor, change out top pipe rams to 4 1/2" x 7"
10:30 -11 :00 0.50 DRILL P INT1 Pull wear bushing
11 :00 - 11 :30 0.50 DRILL P INT1 Pressure test pipe ram doors to 2000 psi
11 :30 - 14:30 3,00 DRILL P INT1 Rig up to run 7" casing
14:30 -15:00 0.50 DRILL P INT1 PU, MU, shoe jt, float jt, check float equipment
15:00 - 19:30 4.50 DRILL P INT1 Run 7" casing to 3000' wI controlled running speed.
19:30 - 21 :00 1,50 DRILL P INT1 Circulate casing, bottoms up, treat mud back to 10 ppg,
Weld on Franks fill up tool
21 :00 - 00:00 3.00 DRILL P INT1 Run 7" casing to 6560' wI controlled running speed.
3/14/2002 00:00 - 01 :00 1.00 DRILL P INT1 Run 7" casing, BTC, L-80, 26#, to 6700'
01 :00 - 01 :30 0.50 DRILL P INT1 Circulate bottoms up, 700 psi at 7 bpm
01 :30 - 06:00 4.50 DRILL P INT1 Run casing to 9218'. wash down, wash by LCM pill, land
hanger in casing head, some packing off, reciprocate
casing,
06:00 - 07:30 1.50 DRILL P INT1 Circulate and condition mud and wellbore for cementing,
reciprocate casing
Wellbore in good condition
07:30 - 10:00 2,50 DRILL P INT1 Cement as per program,
10:00 - 11 :30 1.50 DRILL P INT1 Rig down cementers, clean rig floor, LD landing joint
11 :30 - 13:30 2.00 DRILL P INT1 Run, set packoff wI FMC, test to 5000 psi
13:30 - 14:30 1.00 DRILL P INT1 Set test plug, change top pipe rams to 27/8" x 5"
Test doors to 2000 psi
14:30 - 15:00 0.50 DRILL P INT1 Run wear bushing
15:00 - 15:30 0.50 DRILL P INT1 LD, change out bales
15:30 - 16:00 0,50 DRILL P INT1 PU directional BHA
16:00 - 18:00 2.00 DRILL P INT1 MU directional BHA, program MWD, 1 hour, surface test
MWD
18:00 - 18:30 0.50 DRILL P INT1 PJSM, load nuclear sources
18:30 - 20:00 1.50 DRILL P INT1 MU, DCs, jars, HWDP,
20:00 - 23:30 3.50 DRILL P INT1 Trip in to 8780'
23:30 - 00:00 0.50 DRILL P INT1 Slip I cut drilling line, circulate mud at 2050 psi at 5 bpm
3/15/2002 00:00 - 01 :00 1.00 DRILL P INT1 Slip I cut drilling line, service top drive
Circulate wellbore 2050 psi at 5 bpm
01 :00 - 02:00 1.00 DRILL P INT1 Trip in, wash down last 2 stands, tag float collar at 9187'
02:00 - 03:00 1,00 DRILL P INT1 Pressure test casing to 3500 psi for 30 minutes
03:00 - 04:30 1.50 DRILL P INT1 Rotary drill float collar and cement to 9265',
04:30 - 05:30 1.00 DRILL P INT1 Displace casing to new mud, 8.6 ppg
05:30 - 06:30 1.00 DRILL P INT1 Drill out casing shoe. rat hole, 20' of new hole to 9308'
06:30 - 07:00 0,50 DRILL P INT1 Perform FIT to 9.5 ppg, applied surface pressure 400 psi
07:00 - 12:00 5.00 DRILL P INT1 Rotary drill from 9308' to 9522'
ART 4.92, ADT 4.92
12:00 - 16:00 4.00 DRILL P INT1 Rotary drill from 9522' to 9700'
ART 2.65, ADT 2.65
Printed: 3/18/2002 1: 50: 32 PM
~
,~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Z-39
Z-39
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number:
2/25/2002
3/17/2002
Spud Date: 2/20/2002
End: 3/17/2002
3/15/2002
12:00 - 16:00
16:00 - 16:30
16:30 - 17:00
17:00 - 18:30
18:30 - 22:30
22:30 - 00:00
3/16/2002
00:00 - 01 :30
01 :30 - 02:00
02:00 - 03:30
03:30 - 04:00
04:00 - 08:30
08:30 - 09:00
09:00 - 09:30
09:30 - 10:00
10:00 - 11 :00
11 :00 -12:00
12:00 -13:00
13:00 - 14:00
3/17/2002
14:00 - 20:00
20:00 - 20:30
20:30 - 21 :00
21 :00 - 21 :30
21 :30 - 22:00
22:00 - 00:00
00:00 - 07:30
07:30 - 09:30
09:30 - 11 :00
11 :00 - 12:30
12:30 - 13:30
13:30 - 15:30
15:30 - 17:00
4.00 DRILL P
0.50 DRILL P
0.50 DRILL P
1.50 DRILL P
INT1
INT1
INT1
INT1
4.00 DRILL P
INT1
1.50 DRILL P
INT1
1,50 DRILL P
0.50 CASE P
1.50 CASE P
INT1
CaMP
COMP
0,50 CASE P
4.50 CASE P
CaMP
COMP
0.50 CASE P
0.50 CASE P
0.50 CASE P
1.00 CASE P
COMP
COMP
COMP
COMP
1.00 CEMT P
CaMP
1.00 CEMT P
CaMP
1.00 CEMT P
COMP
6.00 CEMT P
0.50 CEMT P
0,50 CEMT P
0.50 RUNCO
0.50 RUNCO
2.00 RUNCO
7.50 RUNCO
2.00 RUNCO
COMP
COMP
COMP
CaMP
COMP
COMP
CaMP
CaMP
1.50 RUNCO
1.50 RUNCO
CaMP
CaMP
COMP
COMP
1.00 RUNCO
COMP
2.00 RUNCO
1.50 RUNCO
Pump sweep prior to TD
Circulate sweep to surface, flow check
Wiper trip back to 7" casing shoe, flow check, RIH
Circulate sweep surface to surface, spot liner running pill,
5.8 bpm at 1750 psi
Drop EMS tool, 1 7/8" OD, Speery
Flow check, POOH taking EMS shots at 9608', 9514',
at casing shoe drop pipe drift, 2" aD
Recover pipe drift in 4" HT38 x 3 1/2" IF XlO sub, LD
HWDP, jars, DCs, PJSM, remove nuclear sources, down
load MWD
LD directional BHA, clear rig floor
PJSM, rig up to run liner
Run 15 jts, 41/2", BTC, L-80, 12.6#, liner, Baker HMC
hanger, ZXP packer
Run HES float shoe, HES float collar, Baker landing
collar
Circulate liner volume, PU, MU, cement head on single
Trip in liner on drillpipe to 9270', running speed 90
seconds I stand
Rig up cement head to circulate
Circulate bottoms up inside 7" casing shoe
Trip liner to 9700'
MU cement head, circulate and condition mud for
cementing
PU 190K, SOW 160K
PT lines to 3000 psi, cement as per program, pump 9
bbl perf pill, displace wI rig pump, bump plug at 3500
psi, floats held
Release from hanger, circ bottoms up, 9.8 bpm at 2300
psi, cement to surface 6 bbls approx, circ untill seawater
clean, 9 bpm at 2000 psi
Rig down cement head, stand back, LD 5 jts DP, PU
cement head, make breaks, LD cement head
Trip out laying down drillpipe to pipe shed
Lay down running tool, function blind rams
Pressure test casing to 3000 psi for 30 minutes
Pull wear bushing
Rig up to run completion string
Run 31/2", BTC, L-80, 9,6# completion string wI jewelry
Run 3 1/2", BTC, L-80, 9.6# completion string wI jewelry
Space out wI pup jts, MU landing hanger & landing jt,
land tubing, run up lock down screws, RU to reverse
circulate
Reverse circ Corxit treated seawater
Drop ball, test tubing to 3500 psi for 30 minutes, bleed
tubing down to 1500 psi, pressure test annulus to 3500
psi for 30 minutes, bleed off pressure to shear RP valve
Set TWC valve, pressure test to 1000 psi
Clean up rig floor
Nipple down riser, test manifold, BOPE, clear cellar
Nipple up tree, insert adapter seal, test same to 5000 psi
for 10 minutes
Printed: 3/18/2DD2 1 :50:32 PM
1-""
,~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Z-39
Z-39
DRILL +COMPLETE
DOYON
DOYON 14
Start: 2/25/2002
Rig Release: 3/17/2002
Rig Number:
Spud Date: 2/20/2002
End: 3/17/2002
20:00 - 21 :00
21 :00 - 22:00
22:00 - 23:30
23:30 - 00:00
COMP
COMP
COMP
COMP
test tree to 5000 psi for 10 minutes
RU DSM, pull TWC, RD DSM
RU hot oil, freeze protect wI 75 bbls diesel down annulus
at 2 bpm
U tube freeze protect
Set BPV, test same to 1000 psi
Secure well head. Clean mud tanks.
Police location, Release rig 2400 hrs 3/17/02
Printed: 3/18/2002 1 :50:32 PM
~
~
Z-39
Prudhoe Bay Field / Prudhoe Bay Pool
50-029-22995-00
200-208
Rig Accept:
Rig Spud:
Rig Release:
Drillin Ri :
02/25/02
02/26/02
03/17/02
Do on 14
POST RIG WORK
03/31/02
PULLED BALL & ROD FROM RHC -- RAN 31/2" OM-1 TO STA #5.
04/01/02
PULLED STA# 5 (DGLV) & STA# 6 (RP SHEAR VLV) -- SET STA# 6 RK-LGLV; STA# 5 RK-OGLV--
PULLED RHC PLUG BODY -- TAG TD @ 9532' WLM (TARGET =9516' +)
04/05/02
PERFORATED WITH 2.5" HSD @ 6 SPF - 2506 POWERJET CHARGES. LOGGED JEWELRY WITH
GUN GAMMA RAY ON 1ST GUN RUN. TAGGED TD AT 9556 FT MD. GUN INTERVALS: 9380-9405
FT MD / 9420-9435 FT MD / 9440-9450 FT MD / 9477-9485 FT MD / 9494-9516 FT MD. ALL SHOTS
FIRED.
~
~
aoò~~o~
19-Mar-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Definitive
Re: Distribution of SUNey Data for Well Z-39
Dear Dear Sir/Madam:
Enclosed are two sUNey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff SUNey
Projected SUNey:
0.00' MD
MD (if applicable)
9,700.00 MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
SUNey Manager
RECEIVED
Attachment(s)
t'1AR 2 C 2002
Alaska Oil & GasCons.CommiSSkm
Anchorage
DEFINITIVE
)
)
Survey Ref: svy11148
North Slope Alaska
BPXA
PBU_WOA Z Pad, Slot Z-39
Z-39
Job No. AKMW22034, Surveyed: 15 March, 2002
SURVEY REPORT
19 March, 2002
Your Ref: 500292299500
Surface Coordinates: 5959099.82 N, 599440.05 E (70017' 51.6836- N, 149011'40.9881" W)
Kelly Bushing: 86.04ft above Mean Sea Level
SpE!.........y-Sur-)
i seRVices
A Halliburton Company
'I)
DEt=INIT/"f BPXA
Y J WOAZPad
P -
Sperry-Sun Drilling Services
Survey Report for Z-39
Your Ref: 500292299500
Job No. AKMW22034, Surveyed: 15 March, 2002
Vertical
Section
Dogleg
Rate
(0/100ft)
Global Coordinates
Northings Eastings
(ft) (ft)
Local Coordinates
Northlngs Eastings
(ft) (ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
Incl
Measured
Depth
(ft)
Comment
MWD Magnetic
0.00
0.13
0.19
0,59
2.09
0.185
0.228
0.764
0,973
599440.05 E
599440.30 E
599440.45 E
599441.01 E
599442.54 E
5959099.82 N
5959100.02 N
5959100.18 N
5959100.38 N
5959100.06 N
O.OOE
0.25E
0.40 E
0.97E
2.49 E
O.OON
0.20N
0.35N
0.54N
0.20 N
0.00
140.32
205.31
289.11
380.51
-86.04
54.28
119.27
203.07
294.47
0.000
52.120
30.010
77.780
115.660
0.000
0.260
0,130
0.720
1.340
0.00
140.32
205.31
289.11
380.53
)
4,12
6.08
7.45
8,17
9,51
1.386
0.383
0.779
0.252
1.403
599443.94 E
599444.70 E
599444.85 E
599444.53 E
599444.40 E
5959098.35 N
5959095.60 N
5959092.95 N
5959090.78 N
5959087.67 N
3.87E
4.59E
4.71 E
4.36E
4.19 E
1.52 S
4.285
6.935
9.10 S
12.21 S
469.49
558.84
648.03
737.65
830.77
383.45
472.80
561.99
651.61
744.73
160.890
169.370
187.720
191.110
179.020
1.730
1.940
1.510
1.300
2.550
469.54
558.93
648.16
737.81
830.98
12,18
15.51
18,81
21.85
24.51
1,643
0,124
0,053
0.320
0.096
599444.46 E
599444.46 E
599444.43 E
599444.12 E
599443.61 E
5959082.05 N
5959074.92 N
5959067.77 N
5959060.67 N
5959054.02 N
4.17 E
4.08E
3.95E
3.55E
2.95E
17.82 S
24.96 S
32.10 S
39.20 S
45.85 S
927.00
1024.42
1120.53
1217.72
1311.43
840.96
938.38
1034.49
1131.68
1225.39
80.900
80.630
81.320
185.210
185.080
4.130
4.250
4,250
4.120
4,030
927,38
1025.06
1121.44
1218.89
1312.83
27.73
31.53
35.31
39.16
43,15
1.420
0.152
0.484
0.319
0.174
599443.14 E
599442.76 E
599442.18 E
599441.59 E
599441.11 E
5959046.20 N
5959037.35 N
5959028.13 N
5959018.76 N
5959009.29 N
2.38E
1.89 E
1.18 E
0.47 E
0.14W
53.65 S
62.50 S
71.71 S
81.07 S
90.54 S
1406.55
1501.70
1598.78
1694.33
1791.38
1320.51
1415.66
1512.74
1608.29
1705.34
183.600
182.710
185.930
182.800
184.520
5.380
5.260
5.620
5.600
5.570
1408.28
1503.84
1601.36
1697.37
1794.88
)
46.86
52.17
60.88
73.38
90.57
0.239
2.485
2.645
2.981
3.667
599440.31 E
599441.33 E
599446.39 E
599455.88 E
599470.60 E
5958999.80 N
5958990.36 N
5958981.28 N
5958972.47 N
5958963.55 N
1.07W
0.17W
4.77E
14.14 E
28.75 E
100.02 S
109.47 S
118.61 S
127.55 S
136.67 S
1888.20
1983.58
2078.27
2172.71
2266.54
1802.16
1897.54
1992.23
2086.67
2180.50
186.660
163.090
141.620
127.550
117.780
5.670
5.940
6.810
8.920
11.950
1892.17
1988.03
2083.29
2178.63
2274,04
2.00.09.003
DrilfQuesf
112.46
138.96
170.71
207.12
248,11
2.532
3.653
3.444
3.163
2.966
599490.29 E
599514.22 E
599543.32 E
599577.15 E
599614.98 E
5958953.95 N
5958942.51 N
5958929.63 N
5958915.72 N
5958899.60 N
48.30 E
72.08 E
101.01 E
134.65 E
172.27 E
Page 20f6
146.52 S
158.28 S
171.54 S
185.89 S
202.52 S
2360.28
2452.21
2542.75
2631.38
2718.21
2274.24
2366.17
2456.71
2545.34
2632.17
115.900
116.630
112.920
113.260
114.380
14.350
17.840
20.910
23.940
26.750
13:57
2370.31
2466.00
2561.99
2657.88
2753.97
19 March, 2002
<I
'0; '.' .""a.t''<ì
Sperry-Sun Drilling Servicett"~+{
Survey Report for Z-39
Your Ref: 500292299500
Job No. AKMW22034, Surveyed: 15 March, 2002
BPXA
PBU_WOA Z Pad
Vertical
Section
Dogleg
Rate
(0/100ft)
Global Coordinates
Northlngs Eastlngs
(ft) (ft)
Local Coordinates
Northlngs Eastlngs
(ft) (ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
Incl
Measured
Depth
(ft)
Comment
290,98
350,08
375,72
418,84
462,04
0.127
0.199
1.565
0.620
0.304
599654.40 E
599708.82 E
599732.25 E
599771.31 E
599810.52 E
5958882.45 N
5958858.94 N
5958848.39 N
5958830.04 N
5958811.77 N
211.45E
265.56 E
288.84 E
327.66 E
366.63 E
220.195
244.42 5
255.27 5
274.145
292.93 5
2803.37
2921.29
2973.14
3059.86
3145.24
2717.33
2835.25
2887.10
2973.82
3059.20
114.160
114.080
115.910
115.950
115.530
26.820
26.560
26,160
26.760
26.980
2849.36
2981.34
3039.21
3136.08
3231.79
)
505,09
548,10
591.34
633.57
674.48
0.242
0.147
0.413
2.124
0.272
599849.69 E
599888.92 E
599928.27 E
599966.95 E
600004.87 E
5958793.78 N
5958775.95 N
5958757.87 N
5958740.70 N
5958724.90 N
405.56 E
444.54 E
483.66 E
522.10 E
559.81 E
311.445
329.785
348.38 5
366.06 5
382.36 5
3230.30
3315.54
3400.61
3486.62
3573.09
3144.26
3229.50
3314.57
3400.58
3487.05
115.320
115.080
115.770
113.570
113.180
26.770
26,860
27.100
25.310
25.510
3327.15
3422.66
3518.12
3613.98
3709.72
715.63
756,73
797,53
838,72
880.09
0.662
0.458
0.096
0.524
0.515
600042.83 E
600080.59 E
600118.15 E
600155.95 E
600193.99 E
5958708.66 N
5958692.16 N
5958675.91 N
5958659.28 N
5958642.74 N
597.55 E
635.09 E
672.43 E
710.01 E
747.83 E
399.105
416.105
432.84 5
449.97 5
467.01 5
3659.55
3746.51
3833.44
3920.16
4006.25
3573.51
3660.4 7
3747.40
3834.12
3920.21
114.650
114.090
114.200
114.810
113.700
25.540
25.170
25.250
25,680
25.780
3805.53
3901,76
3997,84
4093.89
4189.45
922.29
965.14
1006.41
1048.24
1089.97
0.967
1.145
0.248
0.475
0.243
600232.78 E
600'271.85 E
600309.36 E
600347.50 E
600385.60 E
5958625.83 N
5958608.07 N
5958590.72 N
5958573.36 N
5958556.14 N
786.39 E
825.23 E
862.50 E
900.40 E
938.27 E
484.435
502.71 5
520.56 5
538.42 5
556.145
4092.40
4180.42
4266.81
4353.41
4439.30
4006.36
4094.38
4180.77
4267.37
4353.26
114.910
115.510
115.650
114.820
115.350
26.540
25.450
25,680
25,960
25,950
4285.43
4383.36
4479.13
4575.33
4670.86
)
1131.98
1172,10
1213,97
1255,33
1297.14
0.526
0.283
0.312
0.524
1.413
600424.02 E
600460.78 E
600499.14 E
600537.35 E
600575.66 E
5958538.94 N
5958522.63 N
5958505.63 N
5958489.43 N
5958472.42 N
976.46 E
1013.00 E
1051.14E
1089.13 E
1127.21 E
573.85 5
590.65 5
608.155
624.86 5
642.37 5
4526.36
4610.00
4697.08
4782.92
4870,13
4440.32
4523.96
4611.04
4696.88
4784.09
114.390
114,990
114.310
113.180
116.230
25,660
25.700
25.760
25.850
25,500
4767.56
4860.37
4957.03
5052.38
5149,14
2.00.09.003
DrillQuest
1338.34
1378.69
1418.33
1457,03
1497,24
0.988
0.292
0.691
0.772
0.765
600613.17 E
600650.15 E
600686.63 E
600722.15 E
600758.68 E
5958455.25 N
5958438.88 N
5958423.05 N
5958407.44 N
5958390.53 N
1164.49 E
1201.25 E
1237.51 E
1272.82 E
1309.13 E
Page 30f6
660.04 5
676.90 5
693.20 5
709.28 5
726.68 5
4957.80
5045.37
5132.81
5219.30
5307.80
4871.76
4959.33
5046.77
5133.26
5221.76
114.460
114.810
113.610
115.370
115.820
24,910
24,670
24.230
24.100
24,820
13:57
5246.03
5342.49
5438.55
5533.34
5630.57
19 March, 2002
'"
:"'.': ""'~{~'f
,<0 Sperry-Sun Drilling Servicet;·,:~:,
Survey Report for Z-39
Your Ref: 500292299500
Job No. AKMW22034, Surveyed: 15 March, 2002
BPXA
PBU_WOA Z Pad
Vertical
Section
Dogleg
Rate
(0/100ft)
Global Coordinates
Northlngs Eastlngs
(ft) (ft)
Local Coordinates
Northlngs Eastlngs
(ft) (ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
ncl
Measured
Depth
(ft)
Comment
1538.41
1581,04
1618,86
1664,37
1704,33
1.926
0.332
0.921
0.618
0.785
600795.91 E
600834.46 E
600868.90 E
600910.57 E
600947.28 E
5958372.87 N
5958354.57 N
5958338.81 N
5958320.27 N
5958304.21 N
1346.12 E
1384.43 E
1418.66 E
1460.08 E
1496.57 E
744.835
763.63 5
779.85 5
798.94 5
815.495
5393.33
5478.81
5556.11
5651.93
5738.75
5307.29
5392.77
5470.07
5565.89
5652,71
116.420
115.870
114,840
114.640
114.130
26.630
26.430
25.780
25.130
24.410
5725.51
5821.05
5907,13
6013,25
6108,87
)
1742.29
1777.56
1812.55
1846.38
1879.15
2.522
0.505
1.125
0.579
0.996
600981.93 E
601013.74 E
601045.38 E
601076.16 E
601105.98 E
5958288.55 N
5958273.24 N
5958258.21 N
5958244.06 N
5958230.37 N
1531.01 E
1562.62 E
1594.05 E
1624.64 E
1654.28 E
831.605
847.335
862.77 5
877.33 S
891.42 S
5827.23
5915.00
6005.21
6096.06
6187.78
5741.19
5828.96
5919.17
6010,02
6101.74
116.110
116.810
115.500
115.390
115.470
22.110
21.710
20.730
20.170
19.200
6205.19
6299.79
6396.56
6493.52
6590,94
1909.21
1939.26
1968.46
1995.06
2020.91
0.811
0.786
2.681
1.141
0.284
601133.49 E
601161.24 E
601187.31 E
601210.20 E
601232.51 E
5958218.11 N
5958206.30 N
5958193.13 N
5958179.51 N
5958166.39 N
1681.62 E
1709.22 E
1735.11 E
1757.81 E
1779.95 E
904.04 5
916.22 5
929.735
943.65 5
957.07 5
6275.77
6367.35
6460.67
6550.87
6642.42
6189.73
6281.31
6374.63
6464.83
6556.38
114.060
113.540
121.800
121.200
121.240
18.600
17.860
16.980
15.920
15.650
6683.94
6780.36
6878,15
6972.20
7067.34
2044.62
2070.51
2096.46
2121.22
2145.39
0.226
0.238
0.514
0.429
0.451
601252.88 E
601274.99 E
601297.00 E
601317.84 E
601337.92 E
5958154.22 N
5958140.63 N
5958126.74 N
5958113.17 N
5958099.42 N
1800.16 E
1822.09 E
1843.91 E
1864.57 E
1884.47 E
969.50 5
983.38 5
997.57 5
1011.415
1025.42 5
6727,00
6819.61
6914.29
7007.31
7099.61
6640.96
6733.57
6828.25
6921.27
7013.57
121.950
122.730
123.320
124.330
125.990
15.700
15.610
15,130
14.810
14,730
7155.19
7251.36
7349.56
7445.84
7541.30
)
2169.71
2193.18
2216,26
2239,36
2261,85
0.996
0,581
0.993
0.494
0.716
601358.33 E
601378.54 E
601398.95 E
601419.68 E
601440.05 E
5958085.98 N
5958074.01 N
5958063.23 N
5958053.01 N
5958043.42 N
1904.69 E
1924.75 E
1945.02 E
1965.61 E
1985.85 E
1039.135
1051.375
1062.42 5
1072.91 5
1082.775
7193.30
7285.14
7376.76
7470.17
7563.64
7107.26
7199.10
7290.72
7384.13
7477.60
122.260
120.510
116,680
117.320
114.580
14.520
14.180
14.120
13.670
13.420
7638.12
7732,92
7827.41
7923.63
8019.78
2.00.09.003
DrillQuest
2284.03
2305.93
2327.45
2348.53
2369,41
0.571
0.391
0,584
0,302
0.420
601460.19 E
601479.99 E
601499.37 E
601518.22 E
601536.95 E
5958034.06 N
5958024.67 N
5958015.27 N
5958005.85 N
5957996.59 N
2005.86 E
2025.54 E
2044.79 E
2063.52 E
2082.12 E
Page 4 of6
1092.40 5
1102.055
1111.70 5
1121.37 S
1130.88 S
7657.44
7751.44
7845.26
7938.41
8032.94
7571.40
7665.40
7759.22
7852.37
7946.90
116.820
115.440
117.820
116.800
117.340
13.230
13.020
12.840
12.660
12.270
13:57
8116.17
8212.69
8308.95
8404.46
8501.27
19 March, 2002
f)
Sperry-Sun Drilling Services
Survey Report for Z-39
Your Ref: 500292299500
Job No. AKMW22034, Surveyed: 15 March, 2002
BPXA
PBU_WOA Z Pad
Vertical
Section
Dogleg
Rate
(0/100ft)
Global Coordinates
Northlngs Eastlngs
(ft) (ft)
Local Coordinates
Northlngs Eastlngs
(ft) (ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
Incl
Measured
Depth
(ft)
Comment
2389,64
2408.71
2426,79
2443.53
2459,30
0.343
0.850
1,012
0.495
0,618
601555.04 E
601572.01 E
601588.19 E
601603.36 E
601617.52 E
5957987.52 N
5957978.83 N
5957970.75 N
5957963.62 N
5957956.67 N
2100.09 E
2116.94 E
2133.02 E
2148.09 E
2162.16 E
1140.198
1149.108
1157.408
1164.738
1171.868
8127.28
8220.62
8316.36
8411.27
8504.85
8041.24
8134.58
8230.32
8325.23
8418.81
117.450
118.330
116.160
115.690
118.150
1,940
1.150
0.250
9,780
9.360
8597.75
8693.02
8790.46
8886.84
8981,74
)
2474.15
2488.12
2496.26
2508.44
2521.77
0.898
0.399
0.442
0.757
0.806
601630.60 E
601642.87 E
601650.12 E
601660.92 E
601672.43 E
5957949.65 N
5957942.96 N
5957939.24 N
5957933.62 N
5957926.87 N
2175.14E
2187.32 E
2194.52 E
2205.24 E
2216.66 E
1179.068
1185.91 8
1189.728
1195.488
1202.398
8599.07
8693.97
8750.63
8838.97
8935.31
8513.03
8607.93
8664.59
8752.93
8849.27
119.940
118.740
117.030
119.560
122.640
8.550
8.210
8,140
7,560
8,220
9077.12
9173.04
9230.28
9319.46
9416.72
2535.17
2547.70
2560.72
0.250
0.536
0.000
601683.76 E
601694.34 E
601705.44 E
5957919.61 N
5957912.84 N
5957905.98 N
2227.89 E
2238.39 E
2249.40 E
1209.798
1216.708
1223.71 8
9028.96
9119.37
9215.88
8942.92
9033.33
9129.84
124.180
122.490
122.490
8.130
7.700
7.700
9511.33
9602.61
9700,00
Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at 8urface is 26.114° (19-Mar-02)
The Dogleg Severity is in Degrees per 100 feet (U8).
Vertical 8ection is from Well and calculated along an
)
DrillQuest 2.00.09.003
Page 50f6
Azimuth of 118.550° (True)
Based upon Minimum Curvature type calculations, at a Measured Depth of 9700.00ft.
The Bottom Hole Displacement is 2560.72ft., in the Direction of 118.547° (True).
19 March, 2002
13:57
(I
Sperry-Sun Drilling Services
Survey Report for Z-39
Your Ref: 500292299500
Job No. AKMW22034, Surveyed: 15 March, 2002
BPXA
PBU_WOA Z Pad
on Coordinates
Northlngs Eastlngs
(ft) (ft)
Stat
North Slope Alaska
Comments
Measured
Depth
(ft)
9700.00
Comment
TVD
(ft)
)
Projected Survey
2249.40 E
S
1223.71
9215.88
'''-.
)
DriflQuest 2.00.09.003
Page 60f6
Survey Tool Description
MWD Magnetic
To
Measured Vertical
Depth Depth
(ft) (ft)
9215.88
9700.00
Survey tool program for Z-39
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00 0,00
13:57
19 March, 2002
AlaakaOil&GasCons.COIIInIi8ioo
Anœorage
Date Delivered
BP Exploration (Alaska) Inc.
Petrotectnical Data Center
900 E, Benson Blvd,
Anchorage, Alaska 99508
LR2-
t..PR 1 2 2002
RECEIVED
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-57
ATTN: Sherrie
Received t¡J,
.............
(
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
Z-39 ~IhO-~I1~ 22120 AIT/BHC/PEXlCMR 03/08/02 1
Z-39 22120 PEX-AIT 03/08/02 1 1
Z-39 22120 BHC 03/08/02 1 1
Z-39 22120 PEX-DENlNEUTRON 03/08/02 1 1
Z-39 22120 PEX-SSTVD 03/08/02 1 1
Z-39 22120 CMR 03/08/02 1 1
Z-39 22120 CST 03/08/02 1 1
Z-39 22120 CEMENT VOLUME LOG 03/08/02 1 1
Z-39 22120 MDT 03/08/02 1 1
Z-39 22120 OPTICAL FLUID ANALYZER 03/08/02 1 1
Z-39 \J 22120 MDT 03/08/02 1 1
·1
"
Sc~.'ePIIP
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-571
ATTN: Sherñe
Well Job #
Log Description
Date
Blueline
Sepia
Color
Prints
CD
Field: Prudhoe Bay
Company:
979
NO.
State of Alaska
Alaska Oil & Gas Cons Comm
Aftn: Lisa Weepie
333 West 7th Ave, Suite
Anchorage, AK 99501
00
04/
0102
Re: FW: Ch,anges to Z·39
,l. j
---..
~
Subject: Re: FW: Changes to Z~39 ~DO - ërO ~
Date: Fri, 01 Feb 2002 08:26:02 ~0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Quay, Walter D (Fairweather)" <QuayWD@BP.com>
cc: "Robertson, Brian B" <RobertBB@BP.com>
Walter and Brian,
Thanks for the re-.update. It appears that the basic well design has not been changed with
the additions to scope. The most major change I see is the increase in the Kuparuk
pressure. Given the time between when this was originally permitted and now, recognizing
that is important. I do appreciate your documenting the changes. Although permits are
valid for 2 years after issue, I think you correctly have reviewed the plans to determine
if changes are necessary. I had no doubt that you would not do this. It is part of our
drilling job. Well done.
Tom Maunder, PE
AOGCC
"Quay, Walter 0 (Fairweather)" wrote:
> Tom,
> Here's the resend for Z~39 Permitting Issues as per our phone call of today.
>
> Thanks,
> Walter
>
> > ~--~~Original Message~-~~
> > From: Quay, Walter D (Fairweather)
> > Sent: Tuesday, January 15, 2002 4:06 PM
> > To: Tom Maunder (E~mail)
> > Cc: Tony S Bunch (E~mail); Robertson, Brian B
> > Subject: Changes to Z-39
»
> > Tom,
> > As per our conversation regarding 2-39 well, (permitted on 01/03/2001 and
> > to be drilled 02/2002), there are some changes to this well. I'll attach
> > the Well Plan Summary that contains the details of the changes.
»
> > The significant changes are:
> > * Plan to core Kuparuk
> > * Plan to Open Hole Log the Kuparuk and Schrader Bluff. This wíll
> > include MDTs.
> > * The pressure in the Kuparuk is 10.0 ppg, not the 9.5 ppg EMWas
> > thought.
»
> > There are quite a few tweaks beyond that, such as new mappings on the
> > formations that move the tops by 15-20', we now have an as built surface
> > location, along with the targets adjusted to accommodate the coring and
> > logging, and the knock on adjustments to casing, cementing and mud.
»
»
»
> > «Z~39 Permit to Drill.ZIP»
»
> > Walter Quay
1 012
2/1/02 8:26 AM
Re: FW: Changes to Z-39
, I
.~
~
> > quaywd@bp.com
> > (907)564-4178
> > (907)440-8632 - Cell
»
»
>
> ----------------------------....--------....--.-------------------------
> Name: Z-39 Permit to Dril'.ZIP
> Z-39 Permit to DrHl.ZIP Type: Zip Compressed Data (application/x-zip-compressed)
> Encodmg:base64
Tom Maunder <tom maunder@adm¡n.state.ak.uJ>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
20f2
2/1/02 8:26 AM
~,
~
fWeIfName:
rz=39
x = 601783.07 E, Y::: 5957863.90'
I AFE Number:
4P1463
I Estimated Start Date:
I 02/01/02
I Rig: I Doyon 14
I Operating days to complete: 121
MD:
19,648~ 'SÒ I I TVD:
19,060>55
I KB/Surface Elevation
(a.m.s./) *as staked
181.8'/52.8'
.~
".-....,
Formation Markers
I-ormation "ops Mu , Vu (SS) Ultra-Slimhole uesign
l:3ase !Jermafrost 1987' 1900'
SV3 2215' 212(' !Jore !Jressure estimated at 8.5 ppg
EMW
SV2 2394' 2300' !Jore !Jressure estimated at 8.5 ppg
EMW
SV1 2890' 2632' Surface casing point in shale, 9 5/8"
40# L-80
Surface casing below the hydrate zone
in the SV1 and above the potential
hydrocarbon zone - Ugnu. Pore
Pressure estimated at 8.5 ppg EMW
UG4 3085' 2929'
UG1 4009' 3(62'
lOp Schrader Bluff (ma) 438(' 4102 !Jore I-'ressure ~stimate 9.5 ppg ~MW
WS1 4819' 4492'
CM3 4993' 4560'
Base Schrader ~Iuff 5224' 4857'
IHKL 6844' 6339'
BHK¿ 7109' 6596' "'"
IKU!J . (128' , 6615' I op of Kupar reservoir. !Jore /
,..",~ 's' Pressure esti ted at 10.0 ppg EMW
I Miluveach (256' 6(39' !Jore !Jressure estTmatOO at 0. I ppg
EMW
Jurassic
Kingak 7886' (350'
IJG (947' 7410'
IJt- 8269' 7(22'
IJ~ 8492' (938'
IJU 86/9' 8120'
IJC 9006' 843 ('
IJB 9125' 8553'
IJA 9182' 8608'
Sag Kiver 9262' 8686' Intermediate Casing !Joint. 7" 26# L-80
will set in the base of the Kingak, above
the top Sag River. 8.4 ppg EMW
estimated pore pressure.
Shublik A 9292' 8(15' !Jore pressure estimated at 8.3 ppg
EMW.
Shublik B 9355' 8776'
Shublik C 9385' 8805' !Jore pressure estimated at 8.3 ppg
EMW.
ISAU 9447' 8865' I-'roduction Liner in zone 4 of Ivishak
formation.
!JOWC 9535' 8950'
HOI 9550' 8965'
IL3 9617' 9030'
IU 9648' 9060'
2
/~
,-......
f'#.' "-0 ('"
ó.ø.,,~t. ~
Mud Program:
12-1/4" Hole Section
<
8-3/4" Hole Section
Quick Dril-N
61/8" Hole Section
Directional
e
D excess across e
3
/',
~
eu.
4
,r-'-,
,~
Well Control:
Well control equipment consisting of 5000 psi working pressure pipe rams (2), blind/shear rams, and annular
preventer will be installed and is capable of handling maximum potential surface pressures. Based upon
calculations below BOP equipment will be tested to 3500 psi.
Diverter, BOPE, and drilling fluid system schematics are on file with the AOGCC.
Intermediate Section-
· Maximum anticipated BHP: 3,830 psi @ 8,865' TVDss - Sag River
· Maximum suñace pressure: 2,943 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
Production Interval- t \.h~\....",,"\'f
· Maximum anticipated BHP: 3,880 psi @ 9,030' TVDss - top of Ivishak (8.3 ppg)
· Maximum suñace pressure: 2,977 psi @ surface
(based on BHP and a full column of gas from TO @ 0.10 psi/ft)
· Planned BOP test pressure:
· Planned completion fluid:
3500 psi
8.5 ppg sea water /6.8 ppg Diesel
Drilling Hazards/Contingencies:
HYDROGEN SULFIDE - H2S
· Z Pad is not designated as an H2S drill site, however Standard Operating Procedures
for H2S precautions should be followed at all times.
Highest level of H2S recently measured on Z Pad: 20 ppm from Z-35, 8/17/00.
Closest surface location measured recently(289' away): 10 ppm from Z-03, 8/15/00.
Recent data from nearest BHL (7,754' away): 20 ppm from Z-35.
DRILLING CLOSE APPROACH:
· All wells pass close approach guidelines.
SURFACE HOLE SECTION:
· Z Pad has a history of gas hydrate problems while drilling both the surface and intermediate hole
sections. On the three most recent Z Pad wells gas hydrate problems were minimized in the
surface hole and basically eliminated from the intermediate section. By setting the surface casing
below the SV1 sands rather than above the SV2 sands, hydrates were eliminated from the
intermediate hole. In the surface hole, hydrate gas was minimized by bringing the mud weight to
10.2 ppg by the base permafrost and by pretreating the mud system with 2 ppb Driltreat (Lecithin).
Additional measures include reducing flow rates to -450 to 500 gpm and keeping the mud
temperature cool.
· Minor tight hole has been encountered in the clay sections below the permafrost.
· Differential sticking could be problematic in this hole section adjacent to the permeable SV Sands.
Avoid leaving drill string stationary for extended periods, tighten fluid loss properties of mud, and
string in Barofibre prior to penetrating sand intervals.
· Lost circulation has not been a problem while drilling in the surface section, however losses have
occurred while running and cementing surface casing. Be sure to condition and thin mud
appropriately prior to pulling out of the hole to run casing. Once on bottom with casing, bring
circulation up slowly and reduce mud viscosities before pumping cement.
INTERMEDIATE SECTION:
· Gas cut mud has been observed in the Ugnu (2929' TVDss) and West Sak (4,492' TVDss) sands.
This will be controlled with appropriate mud weights. A minimum of 9.7 ppg is recommended.
5
/'"""'-..
,~
· The Z-39 well path will drill the HRZ, Miluveach, and Kingak shales. The HRZ has not proven
troublesome in the Z Pad area, however precautions will be taken to aid in shale stabilization.
Increased mud weights and inhibitive drilling fluids will be used.
· The shallow intervals beneath Z Pad are highly faulted. These faults have a history of being
conductive and have resulted in several lost circulation incidents. To be prepared for any potential
lost circulation, a copy of the 'Recommended Lost Circulation Procedures' and the 'Lost Circulation
Decision Tree' will be sent to the rig prior to drilling out in the 8-3/4" interval.
· Differential sticking will be a problem if lost circulation is occurring or if the drill string is left
stationary for an extended period or time across the permeable Schrader Sands.
· A LOT EMW is planned after drilling 20' MD of formation.
· The kick tolerance for the 8-3/4" open hole section would be 42.5 bbls assuming an influx from the
Kuparuk interval at -7,130' MD. This is a worst case scenario based on a 10.0 ppg pore pressure
gradient, a fracture gradient of 14.0 ppg at the 9-5/8'~ shoe, and 10.3 ppg mud in the hole.
· The well path will cross one fault with - 50' of throw in the Kingak JC interval. This fault is not
expected to have lost circulation, however, it will be discussed within the well plan and measures
will be taken to control lost circulation or other problems associated with drilling across the fault.
PRODUCTION SECTION:
· No major hole problems are anticipated in this section.
· No faults are predicted. Lost circulation plan will be in place if losses are encountered.
· A FIT test to 9.5 ppg is planned after drilling 20' MD of formation. A FIT of 9.5 ppg EMW would
provide an infinite kick tolerance for the 7" shoe, assuming an influx of gas at the top of Zone 3,
9,617' MD.
Disposal:
· No annular injection in this well.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at D8-04. Any metal cuttings will be sent to the North 810pe Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to D8-04
for injection. Haul all Class I wastes to Pad 3 for disposal.
6
~
,~.
,.--."
DRILL AND COMPLETE PROCEDURE SUMMARY
Pre-Rig Work:
The 20" conductor is set.
1. Weld an FMC landing ring for the FMC Gen. V Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move.
Rig Operations:
1. MIRU Doyon 14.
2. Nipple up and function test 21-1/4" diverter system. PU 4" DP as required and stand back in derrick.
3. MU 12 %" drilling assembly and drill surface hole to to planned KOP at approximately 2000' MD. Build
angle at 4°/100' to a tangent angle of 26° and TD the surface hole at approximately 2900' MD will be
below the top of the SV1 sands.
4. Run and cement the 9 5/8", 40#, L-80, BTCM casing to surface.
5. ND diverter system and NU casing / tubing head. NU BOPE and test to 3500 psi.
6. MU 8 %" drilling assembly and RIH to float collar. Test the 9 5/8" casing to 3500 psi for 30 minutes.
7. Drill out shoe joints and displace well to 9.0 ppg LSND fluid. Drill new formation to 20' below 9 5/8" shoe
and perform Leak Off Test.
8. Drill ahead to 100' above the Kuparuk River formation. POOH for coring.
.. 9. Core 120' of Kuparuk formation.
10. Open 8-1/2" core interval to 8-3/4" and drill-7400'(100' of rathole below Kuparuk)
11. RU and open hole logging, PEX, Dipole Sonic, MDT and SWC. Depending on hole conditions, a clean
out assembly may be run between logging runs.
12. MU 8 %" drilling assembly and drill ahead to TD of intermediate section; top of Sag River at -9,300'MD /
8,807' TVD. POOH.
13. Run and cement the 7", 26# intermediate casing. Cement will be brought 500' above the Schrader
formation if hydrocarbons are present.
14. Test BOPE to 3500 psi.
15. MU 6 1/8" drilling assembly and RIH to float collar. Test the 7" casing to 3500 psi for 30 minutes.
16. Drill out shoe joints with existing LSND fluid. Drill to within a few feet of the float shoe and circulate to
change mud system over to a 8.8 ppg Quick Dril-N fluid.
17. Drill new formation to 20' below the 7" shoe and perform FIT to 9.5 ppg EMW. Drill ahead to TD of
production hole in the base of the Ivishak zone 4 at -9,646' MD /9,144' TVD..
18. Run in hole with the 4 'Y2" 12.6# L-80 Liner Assembly and cement in place. Set the liner top packer at
-9,150' MD /8,661'TVD, 150' above the 7" shoe. POOH laying down DP and liner running tools.
19. Test the 4-1/2" liner to 3000 psi for 30 minutes.
20. Run 3-1/2", 9.3#, 13 Cr completion. Stab the tubing into the liner top packer. Test tubing to 3500 psi for
30 min. See attached completion schematic for details.
21. Install two-way check. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Pull two-way
check and freeze protect the well to -2000' TVD.
22. Install BPV. Secure the well and rig down / move rig.
Estimated Spud Date:
02/02/02
Walter Quay
Alaska Drilling and Wells
Operations Drilling Engineer, 564-4178
7
-..
,--.;
S TA T E OF ALASKA
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 W. 7th Ave., Suite 100
Anchorage, AK 99501
PHONE: (907) 279-1433
FAX: (907) 276-7542
Dan Stone
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
POBox 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Unit Z-39
BP Exploration (Alaska) Inc.
Permit No: 200-208
Sur Loc: 4301'NSL, 3238'WEL, Sec. 19, TllN, RI2E, UM
Btmhole Loc. 3010'NSL, 873'WEL, Sec. 19, TIIN, RI2E, UM
Dear Mr. Dan Stone:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you rrom obtaining additional permits required by law £fom
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test ofBÙPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Daniel T. Seamount, Jr.
Commissioner
BY ORDER OF THE COMMISSION
DA TED this '3 ~ day of January, 2001
dlfÆnclosures
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
,-"",
ALASK.'
STATE OF ALASKA ~
,IL AND GAS CONSERVATION COMh.. ;SION
PERMIT TO DRILL
20 AAC 25.005
1 a. Type of work IBI Drill D Redrill 11 b. Type of well D Exploratory D Stratigraphic Test IBI Development Oil
D Re-Entry D Deepen D Service 0 Development Gas j¡" Single Zone D Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RKB = 81.8' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028262
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
4301' NSL, 3238' WEL, SEC. 19, T11N, R12E, UM (AsStaked) Prudhoe Bay Unit
At top of productive interval 8. Well Number
3054' NSL, 953' WEL, SEC. 19, T11 N, R12E, UM 2-39 Number 2S100302630-277
At total depth 9. Approximate spud date
3010' NSL, 873' WEL, SEC. 19, T11N, R12E, UM 12/20/00 Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 047453,3010' MD Z-11 is 33' away at 1100' 2560 9797' MD / 9060' TVDss
16. To be completed for deviated wells 0 17. Anticipated pressure {see 20 MC 25.035 (e) (2)}
Kick Off Depth 3500' MD Maximum Hole Angle 28 Maximum surface 2958 psig, At total depth (TVD) 8890' / 3847 psig
18. Casing Program Specifications Setting Depth Ouantitv of Cement
Size Ton Bottom
Hole Casino Weinht Grade Couolina Lennth MD TVD MD TVD linclude staae data)
30" 20" 91.5# H-40 Weld 80' Surface Surface 80' 80' 1?60 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 40# L-80 BTC-M 3100' Surface Surface 3100' 3099' 505 sx Articset Ute 3, 43 sx Class 'G'
8-3/4" 7" 26# L-80 BTC-M 9418' Surface Surface 9418' 8725' 553 sx Ute Crete, 183 sx Class 'G'
6-1/8" 4-1/2" 12.6# 13Cr Premium 529' 9268' 8593' 9797' 9060' 87 sx Class 'G'
19. To be completed for Red rill , Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor RECEIVED
Surface
Intermediate
Production DEC Os 2000
Liner
Alaska Oil & Gas Cons. Commission
Anchorage
Perforation depth: measured n,....,!0!~f"L
~~! \
true vertical -'1 : - \
"
20. Attachments IBI Filing Fee o Property Plat o BOP Sketch o Diverter Sketch IBI Drilling Program
181 Drilling Fluid Program o Time vs Depth Plot o Refraction Analysis o Seabed Report o 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Scott, Kolstad, 564-5347 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the foregoing is true and correct to the best of my knowledge '.ils(()~
Signed Dan Stone c:::::>_~. ~ Title Senior Drilling Engineer Date
1..\:/i·..;1';,.···;·. ...'···.»)1'..,),':::>···.,...··..·.(/',..,,;;;.·..___ """"!'..,:.:;;;. ....,.,.....,..,.,'.:'...... :;.,';.
Permit ~~~ _ 'Zf:Ç< :~I ~Ztq - 27.--9c;Ç-CJ6 Approval Date See cover letter
D j - t.7;3- () J for other requirements
Conditions of Approval: Samples Required DYes g¡ No Mud Log Required DYes gNo
Hydrogen Sulfide Measures ~Yes DNa Directional Survey Required ~Yes No
Required Working Pressure for BOPE D2K D3K D 4K D 5K D10K D 15K ~3.5K psi f_ 8'f~
Other: ,.)H,i1,3iI\iAL SIGI\HU BY
o Taylor Searnoum by order of Date /~cJ - 01
Approved By Commissioner the commission
Form 10-401 Rev. 12-01-85
ORISI¡\~AL
Submit In Triplicate
~
r'\
I Well Name:
Z-39
Well Plan Summar
Bottom Hole Location:
Ivishak Producer
4301' FSL, 3238' FEL, T11 N, R12E, S19 * As staked
X = 599439.99 E, Y = 5959100.01 N
3054'FSL,953'FEL,T11N,R12E,S19
X = 601745.0 E, Y = 5957885.0 N
3010'FSL,873'FEL,T11N,R12E,S19
X = 601826.17 E, Y = 5957841.81
Target Location: #1
1 AFE Number:
4P1463
1 Rig: 1 Nabors 7 ES
I Estimated Start Date:
112/20/00
I Operating days to complete: 121
TVD:
81.8'/52.8'
I MD: 19,797'
19,060'ss
Well Design (conventional, slimhole, etc.):
Conventional Ultra-slim hole "Slant" well. Deep
kick-off in the West Sak formation maintaining 28°
tangent angle to TD in zone 4 of the Ivishak.
Objective: Development well to Ivishak zone 4 sands. Evaluate the well bore for hydrocarbon
resence and characteristics of the Schrader Bluff and Ku aruk reservoirs.
RECEIVED
DEC 05 2000
Alaska Oil & Gas Cons. Commission
Anchorage
/"'-\
r-:....
Formation Markers
Formation Tops MD TVD (SS) Ultra-Slim hole Design
Base Permafrost -1900' 1900'
SV3 -2250' 2250' Pore Pressure estimated at 8.5 ppg
EMW
SV2 -2420' 2420' Pore Pressure estimated at 8.5 ppg
EMW
SV1 -2760' 2760' Surface casing point in shale, 9 5/8"
40# L-80
Surface casing below the hydrate zone
in the SV1 and above the potential
hydrocarbon zone - Ugnu. Pore
Pressure estimated at 8.5 ppa EMW
UG4 -3090' 3090'
UG1 -3880' 3800'
WS1 -4544' 4410'
CM3 -4820' 4650'
THRZ -6740' 6350'
BHRZ -7010' 6590'
TKUP - 7030' 6600' Top of Kuparuk reservoir. Pore
Pressure estimated at 9.5 PPQ EMW
T Miluveach - 7220' 6780' Pore Pressure estimated at 8.7 ppg
EMW
Jurassic
Kinaak -7915' 7390'
TJG 7410'
TJF 7710'
TJE 7920'
TJO 8170'
TJC 8360'
TJB 8575'
TJA 8625'
Sag River -9418' 8725' Intermediate Casing Point. 7" 26# L-80
will set in the base of the Kingak, above
the top Sag River. 8.4 ppg EMW
estimated pore pressure.
Shublik A -9450' 8750' Pore pressure estimated a~~
EMW. ?S~
Shublik B 8805'
Shublik C 8830' Pore pressure estimated a~ ppg
EMW. ß.~ iSPrfJ
TSAO -9605' 8890' Production Liner in zone 4 of Ivishak \
formation.
POWC 8950'
HOT 8965'
TD 9060' 9060'
~
~
(~:S~
~ ~ '>c,,\\\Ltl~
RECE\VED
DEC 05 2000
Alaska Oil & Gas Cons. Commission
Anchorage
2
aSlnClJ u Ina roaram: ra- 1m oe eSla n
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O,D, MDITVDss MDITVDss
30" 20" 91.5# H40 WELD 80' surface 80'/80'
12 }4" 9 5/8" 40# L-80 STCM 3,100' surface -3,100' / 3,099'
8%" 7" 26# L-80 STCM 9,418' surface 9,418' /8,725'
61/8" 4-1/2" 12.6# 13 Cr Premium 529' 9,268' / 8,593' 9,797' / 9,060'
TubinQ 3-1/2" 9.3# 13 Cr Premium -9,268' surface 9,268' / 8,593'
ur ace oe u rope les: res ater pu - oe ectlon
From Surface to -3,100' MD (below top SV1).
Density (ppg) Viscosity YP LSR YP Gel API FL
Interval (seconds) 10 sec
Initial- to base 8.6 - 9.4 300+ 50 - 70 30 - 40 35 - 55 12 -15
permafrost
Base 10.2 60-65 20 - 25 3-6 12 - 25 <10
permafrost to
Interval TD
,~,
~,
c
IT b"
51" hiD
p
Ult
"
Mud Program:
S f
HIM dP
rf
F hW
S d
12 1/4" HIS
8-3/4" Hole Section
PH
9.0 - 9.5
9-9.5
Production Hole Mud Pro erties: 6% NaCI Quick Dril-N
Quick Dril-N
From Intermediate Casin Shoe to 9,797' MD
Densit Funnel Vis Yield Point PV tauO
8.8 - 8.9 40 - 50 20 - 25 5 - 8 3 - 7
API FL
6-8
HTHP FL
NA
<5
<10
6 1/8" Hole Section
Directional
KOP: ± 3,500' MD - 3°/100' build
Maximum Hole Angle: + 28.0° - Slant Well
Close Approach Well: All wells pass BP Close Approach guidelines. The
nearest close approach well is Z-11, which is
33.01' well-to-well at 1,100' MD.
Survey Program: MWD Surveys from surface to TD. Gyro may be
needed for surface hole.
APIFL
<10
c:
0
'(ñ
CI)
0 'š
LJ.J 0 E
0 0
> 0 u
C'-I . ()
ê~
I.() 0...
LJ..J <:;) uo
rn=
U RlQ
<..) (!)~
LLJ lJ.J að
Ck:: 0 i5
~
m
3 <
/'~\
~,
Cement Calculations:
CasinQ Size I 9-5/8" Surface - 1 Stage I
Basis: Lead: Based on 2,600' of open hole from surface to 2,600' MD + 175 % excess across the
permafrost.
Lead roc: Surface
Tail: Based on 500' MD open hole volume + 82' shoe track volume + 30% excess.
Tail TOG: At -2,100' MD
Total Cement Volume: Lead 399 bbl I 2241 W I 505 sks of Dowell ARTICSET Lite 3 at 4.44
cf/sk.
Tail 43 bbl I 241 fr'l 43 sks of Dowell Premium 'G' at 15.8 ppg and
1 .17 cf/sk.
Casing Size I 7" Intermediate
Basis: Lead: Based on 4,374' of open hole (to 500' MD above top Schrader Bluff) with 100% excess.
Lead TOG: At -4,044' MD (-4,035' TVD).
Tail: Based on 82' shoe track volume and 1,000' of open hole (to 1000' MD above top Sag River
formation) with 30% excess.
Tail TOG: At -9,318' MD
Total Cement Volume: Lead 235 bbl I 1320 ft" I 553 sks of Dowell LiteGrete at 11.0 ppg at
2.39 cf/sk
Tail 38 bbl 1214 fr' 1183 sks of Dowell Premium 'G' at 15.8 ppg and
1.17 cf/sk.
Liner Size I 4 W' Production I
Basis: Tail: Based on 379' of open hole with 50% excess, 150' of 7" x 4.5" liner lap, 200' of 7" x 4" drill
pipe annulus volume, and 82' of 4-1/2" shoe joint.
Tail TOG: At top of liner -9,268' MD
Total Cement Volume: I Tail 118 bbl 1101 ft" I 87 sks of Dowell Premium 'G' at 15.8 ppg and
1 .17 cf/sk.
Lo
MWD directional I GR
MWD directional I GR I Res.
MWD directional I GR I Res. I Den. I Neu.
No Logs needed
1) Platform Express (GR/RES/Den/NUE) 2) BHG Sonic 3) CMR 4)
Percussion SWG 5 RFT
None
None
RECE\VED
DEC 05 2000
. ¡or
k Oil & Gas Cons. Commlss
Alas a Anchorage
4
r---..
,~,
Well Control:
Well control equipment consisting of 5000 psi working pressure pipe rams (2), blind/shear rams, and annular
preventer will be installed and is capable of handling maximum potential surface pressures. Based upon
calculations below BOP equipment will be tested to 3500 psi.
Diverter, BOPE, and drilling fluid system schematics are on file with the AOGCC.
Intermediate Section-
· Maximum anticipated BHP: 3,811 psi @ 8,725' TVDss - Sag River
· Maximum surface pressure: 2,938 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
Production Interval-
· Maximum anticipated BHP: 3,847 psi @ 8,890' TVDss - top of Ivishak (8.4 ppg)
· Maximum surface pressure: 2,958 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
· Planned BOP test pressure:
· Planned completion fluid:
3500 psi
8.5 ppg sea water / 6.8 ppg Diesel
Drilling Hazards/Contingencies:
HYDROGEN SULFIDE - H2S
· Z Pad is not designated as an H2S drill site, however Standard Operating
Procedures for H2S precautions should be followed at all times.
Highest level of H2S recently measured on Z Pad: 20 ppm from Z-35, 8/17/00.
Closest surface location measured recently(289' away): 10 ppm from Z-03, 8/15/00.
Recent data from nearest BHL (7,754' away): 20 ppm from Z-35.
RECEIVED
DRILLING CLOSE APPROACH:
· All wells pass close approach guidelines.
DEC 05 2000
SURFACE HOLE SECTION: Alaska Oil & Gas Cons. Commission
Anchorage
· Z Pad has a history of gas hydrate problems while drilling both the surface and intermediate hole
sections. On the three most recent Z Pad wells gas hydrate problems were minimized in the surface
hole and basically eliminated from the intermediate section. By setting the surface casing below the
SV1 sands rather than above the SV2 sands, hydrates were eliminated from the intermediate hole.
In the surface hole, hydrate gas was minimized by bringing the mud weight to 10.2 ppg by the
base permafrost and by pretreating the mud system with 2 ppb Driltreat (Lecithin).
Additional measures include reducing flow rates to -450 to 500 gpm and keeping the mud
temperature cool.
· Minor tight hole has been encountered in the clay sections below the permafrost.
· Differential sticking could be problematic in this hole section adjacent to the permeable SV
Sands. Avoid leaving drill string stationary for extended periods, tighten fluid loss
properties of mud, and string in Barofibre prior to penetrating sand intervals.
· Lost circulation has not been a problem while drilling in the surface section, however
losses have occurred while running and cementing surface casing. Be sure to condition
and thin mud appropriately prior to pulling out of the hole to run casing. Once on bottom
5
~
,,"'-""',
with casing, bring circulation up slowly and reduce mud viscosities before pumping
cement.
INTERMEDIATE SECTION:
· Gas cut mud has been observed in the Ugnu (3,090' TVDss) and West Sak (4,410'
TVDss) sands. This will be controlled with appropriate mud weights. A minimum of 9.3
ppg is recommended.
· The Z-39 well path will drill the HRZ, Miluveach, and Kingak shales. The HRZ has not
proven troublesome in the Z Pad area, however precautions will be taken to aid in shale
stabilization. Increased mud weights and inhibitive drilling fluids will be used.
· The shallow intervals beneath Z Pad are highly faulted. These faults have a history of
being conductive and have resulted in several lost circulation incidents. To be prepared
for any potential lost circulation, a copy of the 'Recommended Lost Circulation Procedures'
and the 'Lost Circulation Decision Tree' will be sent to the rig prior to drilling out in the 8-
3/4" interval.
· Differential sticking will be a problem if lost circulation is occurring or if the drill string is left
stationary for an extended period or time across the permeable Schrader Sands.
· The kick tolerance for the 8-3/4" open hole section would be 40.6 bbls assuming an influx
from the Kuparuk interval at -7,050' MD. This is a worst case scenario based on a 9.9
ppg pore pressure gradient, a fracture gradient of 12.5 ppg at the 9-5/8" shoe, and 10.6
ppg mud in the hole.
· The well path will cross one fault with - 50' of throw in the Kingak JC interval. This fault is
not expected to have lost circulation, however, it will be discussed within the well plan and
measures will be taken to control lost circulation or other problems associated with drilling
across the fault.
PRODUCTION SECTION:
· No major hole problems are anticipated in this section.
· No faults are predicted. Lost circulation plan will be in place if losses are encountered.
· A FIT test to 9.5 ppg is planned after drilling 20' MO of formation. A FIT of 9.5 ppg EMW
would provide an infinite kick tolerance for the 7" shoe, assuming an influx of gas at the
top of Zone 4, 9,605' MD.
Disposal:
· No annular injection in this well.
· Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and
inject at OS-04. Any metal cuttings will be sent to the North Slope Borough.
· Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to OS-04
for injection. Haul all Class I wastes to Pad 3 for disposal.
RECEIVED
DEC 05 2000
Alaska Oil & Gas Cons. Commissiol'!
Anchorage
6
/-......
~\
DRILL AND COMPLETE PROCEDURE SUMMARY
Pre-Rig Work:
The 20" conductor will be set in pior to the arrival of 7ES on Z Pad.
1. Weld an FMC landing ring for the FMC Gen. V Wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move.
Rig Operations:
1. MIRU Nabors 7ES.
2. Nipple up and function test 21-1/4" diverter system. PU 4" DP as required and stand back in derrick.
3. MU 12 '14" drilling assembly and drill surface hole to approximately 3,100' MD. The actual surface hole
TD will be below the top of the SV1 target sands.
4. Run and cement the 9 5/8", 40#, L-80, BTCM casing to surface.
5. ND diverter system and NU casing / tubing head. NU BOPE and test to 3500 psi.
6. MU 8 3fi¡" drilling assembly and RIH to float collar. Test the 9 5/8" casing to 3500 psi for 30 minutes.
7. Drill out shoe joints and displace well to 9.0 ppg LSND fluid. Drill new formation to 20' below 9 5/8" shoe
and perform Leak Off Test.
8. Drill ahead to planned KOP at approximately 3,500' MD. Build angle at 3°/100' to a tangent angle of 28°.
9. Drill ahead to target #1 and through base of Kuparuk River formation. POOH for open hole logging, RFT
and SWC. Depending on hole conditions, a clean out assembly may be run between logging runs.
10. MU 8 3fi¡" drilling assembly and drill ahead to TD of intermediate section; top of Sag River at -9,418'MD /
8,725' TVDss. POOH.
11. Run and cement the 7", 26# intermediate casing. Cement will be brought 500' above the Schrader
formation if hydrocarbons are present.
12. Test BOPE to 3500 psi.
13. MU 6 1/8" drilling assembly and RIH to float collar. Test the 7" casing to 3500 psi for 30 minutes.
14. Drill out shoe joints with existing LSND fluid. Drill to within a few feet of the float shoe and circulate to
change mud system over to a 8.8 ppg Quick Dril-N fluid.
15. Drill new formation to 20' below the 7" shoe and perform FIT to 9.5 ppg EMW. Drill ahead to TD of
production hole in the base of the Ivishak zone 4 at -9,797' MD / 9,144' TVD..
16. Run in hole with the 4 '112" 12.6# 13 Cr Liner Assembly and cement in place. Set the liner top packer at
-9,268' MD / 8,591 'TVDss, 150' above the 7" shoe. POOH laying down DP and liner running tools.
17. Test the 4-1/2" liner to 3000 psi for 30 minutes.
18. Run 3-1/2", 9.3#,13 Cr completion. Stab the tubing into the liner top packer. Test tubing to 3500 psi for
30 min. See attached completion schematic for details.
19. Install two-way check. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Pull two-way
check and freeze protect the well to -2000' TVD.
20. Install BPV. Secure the well and rig down / move off 7ES.
Estimated Spud Date:
12/20/00
Scott Kolstad
Alaska Drilling and Wells
Operations Drilling Engineer, 564-5347
RECEIVED
DEC 05 2000
Alaska 011 & Gas Cons, Commission
Anchorage
7
~
/--\
Z-39 Riqsite
Summary of DrillinQ Hazards
POST THIS NOTICE IN THE DOGHOUSE
-v Z Pad is not designated as an H2S drill site, however Standard Operating
Procedures for H2S precautions should be followed at all times. The highest
level of H2S ever measured on Z Pad has been 21 ppm from Z-18.
-v Z Pad has a history of gas hydrate problems while drilling both the surface and
intermediate hole sections. On the three most recent Z Pad wells gas hydrate
problems were minimized in the surface hole and basically eliminated from the
intermediate section. By setting the surface casing deeper, down below the SV1
sands rather than above, hydrates were eliminated from the intermediate hole. In
the surface hole, hydrate gas was minimized by bringing the mud weight to 10.2
ppg by the Base Permafrost and by pre-treating the mud system with 2 ppb
Driltreat (Lecithin). Additional measures include reducing flow rates to -450 to
500gpm and keeping the mud temperature cool.
-v The shallow intervals beneath Z Pad are highly faulted. These faults have a
history of being conductive and have resulted in several lost circulation incidents.
To be prepared for any potential lost circulation, a copy of the 'Recommended
Lost Circulation Procedures' and the 'Lost Circulation Decision Tree' will be sent
to the rig prior to drilling out in the 8-3/4" interval.
-v Gas cut mud has been observed in the Ugnu (3090' TVDss) and West Sak (4410'
TVDss) sands. This will be controlled with appropriate mud weights.
-v The Z-39 well path will drill the HRZ, Miluveach, and Kingak shales. The HRZ
has not proven troublesome in the Z Pad area, however precautions will be taken
to aid in shale stabilization. Increased mud weights and inhibitive drilling fluids
will be used.
-v Differential sticking could be problematic in both hole sections. Avoid leaving drill
string stationary for extended periods, tighten fluid loss properties of mud, and
string in Barofibre prior to penetrating highly permeable sand intervals.
CONSULT THE Z PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
Version 1.0
RECEIVED
DEC 05 2000
Z-39 Hazards and Contingencies Paae. 1 n.f 1.
Alaska Oil & Gas Cons. ùommrsslon
Anchorage
12 1/4"
Hole size
8 3/4"
Hole Size
61/8"
Hole Size
6/28/00
9/26/00
~
r-",
Z-39
PROPOSED COMPLETION DESIGN
SRK
SRK
X Nipple @ ±2000' MD.
95/8" TAM Port Collar @ 2054' MD.
95/8"" 40# L-80 BTCM Casing +/-3,200' MD
3-1/2" 13Cr-80 NSCT or Fox Tubing
6 GLMs
Gas Lift Mandrel spacing TBD
Wellhead 3 1/2"
Completion: FMC New Standard
Slim hole Wellhead, 7" set on slips, 4
1/2" Tubing Hanger
Cameron 41/16" 5K (Carbon) Tree
"X" nipple
7" x 3-1/2" Production packer @ ±9,OOO' MD
"X" nipple NO 'XN' in well bore
3-1/2" 13 Cr tubing Tail @ ±9,200' MD
Top of 4-1/2" L-80, 12.6#, 13 Cr Fox Liner @ ±9,200'
MD
7",26# L-80 BTCM Casing +/- 9,350' MD
RECEIVED
DEC 05 2000
Alaska Oil & Gas Cons. Commission
4-1/2", 12.6#, 13 Cr-80, Fox Solid cemented Anchorage
liner to TD @ +/-10,000' MD
EWE
WELL: Z-39
API #: 50-029-?
/"'..
~
b'm,.1L1J11a ~iJ''Sl,Iì!!Ii.
¡,-~
North Slope Alaska
Alaska Drillin & Wells
~
PBU_WOAZ Pad
Z-39 W 2
DriUQueBt~
Single Well Target Data for Z-39 Wp2
,00
agln Dlr 111.00'/1001t : 1000,OOft MD. 1000,000 TVD
nd Oir: 1300.ootI MD, 1299.86ft TVD
egin OJr@ 1.00o/100ft : 1500.000 MD,1499.59tt TVO
GOO,OO
End Oir : 1800.00tt MD. 1799.45ft TVO
.-- -- -- -~.-
400.00
Measurement Units: It
Coordinate
Target Point TVD TVDss Northings Eastings Northings Eastings Target
Name Type ASP-Y ASP-X Shape
Z-G TSAD Target Entry Point 8967.80 8885.00 5957885.00 N 601745.00 E 1245.40 S 2288.73 E Point
Entry Point 8%7.80 8885.00 5958035.00 N 601515.00 E 1092.37 S 2060.74 E Polygon
Boundary Point A 8%7.80 8885.00 5958035.00 N 601515.00 E 1092.37 S 206O.74E
B 8%7.80 8885.00 5958120.00 N 601905.00 E 1012.54 S 2451.83 E
C 8%7.80 8885.00 5957720.00 N 601985.00 E 1413.56 S 2526.53 E
D 8%7.80 8885.00 5957635.00 N 601595.00 E 1493.40 S 2135.44 E
Proposal Data for Z-39 Wp2
Vertical Origin: Well
Horizontal Origin: Well
0 Measurement Units : fI
North Reference : True North
1500
3000
J::
-
a.
Q)
o 4500
(ij
()
t
Q)
>
6000
7500
-==
0
0
l{)
,...
II
..c::
() 9000
.!:
Qj
ïii
u
(/)
Dogleg severity : Degrees per 100 feet
Vertical Section Azimuth : 118.558'
Vertical Section Description: Well
Vertical Section Origin: 0,00 N.O.OO E
Measured Incl. Azlm. Vertical Northlngs Eastlngs Vertical Dogleg
Depth Depth Section Rate
0,00 0.758 0,00 O.OON O,OOE 0,00
1000,00 0.758 1000,00 O,OON O,OOE 0,00 0.00
1300.00 315,758 1299,86 5,63N 5,48W -7,50 1.00
1500.00 315,758 1499.59 13.12N 12.78W -17.50 0,00
1800,00 0.758 1799.45 18,75N 18.26W -25,00 1,00
3500.00 0, 3499.45 18,75N 18.26W ·25,00 0.00
4425.38 II 4389,05 86,89 S 174,53 E 194,83 3,00
9601.09 8%9,00 1245,40 S 2288.73 E 2605,63 0,00
9797.5û 9142,80 1289.36 S 2368,96 E 2697,11 0,00
.--.--.--.-- -
Current Well Properties
Z-39
agio Oir @ 3.ooo/100ft : 3500.000 MO. 3499.45tt TVD
ates:
ordinates:
cture Reference :
eographical Coordinates:
5959100.01 N, 599439.99 E
1894.29 N, 1835.53 W
70017' 51.6855" N, 1490 11' 40.9898" W
200,00
End Dir: 4419.56ft MD, 4383.89ft TVD
. ...,.. ~~~?~.~~,~e..a~h~'~~!.: ,
o
LU
>
-
""U-J
_U
,,"""mm ,U-J
" ,m mm ,_m ,mœ:
....- -.... .-...
""H'
........
--~------
.oo~ ~
....... .... ......=====
Total Depth: 978B.91ftMD,9142.BOftTVD
o 1500 3000
Scale: 1 inch = 1500ft Section Azimuth: 118.558° (True North)
Vertical Section
C)
C>
~
LO
o
<J
W
o
c:
o
0ü.i
en
"ë
e
o
o
. ()
ê~
o~
00
ø.c
~o
(.!)~
oð
Õ
~
en
~
<!
82.8011 above Mean Sea Level
82.8011 above Structure Reference
True North
Feet
Z-39 Wp2 Formations
Measurement Units: It
TVDRT
Formation Name
2332.80
2502.80
2842.80
3172.80
3882.80
4492.80
4732.80
6432.80
6672.80
6682.80
6862.80
7472.80
7492.80
7792.80
8002,80
8252.80
8442.80
8657.80
8707.80
8807.80
8832.80
8877 .80
8897.80
8947.80
9032.80
9047.80
9142.80
SV-3
SV-2
SV-I
UG-4
UG-I
WSI
CM-3
THRZ
BHRZ
TKUP
TMLV
TKNG
TJG
TJF
TJE
TJD
TJC
TJB
TJA
TSGR
Shublik A
Shublik B
Shublik C
TSAD
POWC
HOT
TDD
Dr¡UQ"e.,t
PBU_WOA Z Pad
Z-39 W~2
Dogleg
Rate
0.00
1.00
0.00
1.00
0.00
3.00
0.00
0.00
Vertical
Section
0,00
0.00
·7.50
·17,50
·25,00
·25,00
194,83
2605,63
2697,1\
Eastlngs
O,OOE
O,OOE
5.48W
12.7&W
18.26W
18.26W
174.53E
2288.73 E
2368.96 E
Proposal Data for Z-39 Wp2
Northlngs
O.!X)N
O.OON
5.63N
13.12N
18,75N
18.75N
86,89 S
1245.40 S
1289,36 S
feet
Vertical
Depth
O,(X)
1000,00
1299.86
1499.59
1799,45
3499,45
4389.05
8969.00
9142.80
2400
Dogleg severity: Degrees per 100
Vertical Section Azimuth: 118.558"
Vertical Section Description:Well
Vertical Section Origin: 0.00 N,O.OO E
- -
Incl Azim.
0.00
HXKJ.(X)
13(xJ.lKI
¡500.00
18(xJ.lKI
35(KJ.lKI
4425.38
9601.09
9797,50
Wel
Well
It
True North
0.758
0.758
315.758
315,758
0.758
0,758
118,721
118.721
118.721
O,(KK)
O.!KK)
),(XXI
3.000
O.(XX)
O.!XX)
27.762
27.762
27.762
2000
~~~~~~t~lri8i~~in :
Measurement Units
North Reference:
Measured
Depth
North Slope Alaska
Alaska Drilling & Wells
Single Well Target Data for Z-39 Wp2
Measurement Units: II
Coordinate
Target Point TVD TVDss Norlhlngs Easllngs Northings Easllngs Targel
Name Type ASP·Y ASP·X Shape
- -
Z-G TSAD Target Entry Poinl 8967,80 8885.00 5957885,00 N 601745,(XIE 1245,40 8 2288,73 E Point
Z-G T8ADrrD Poly Entry Poinl 8967.80 8885.!KI 5958035,()() N 601515,()()E 1092.37 8 2060,74 E Polyg{
Boundary Poinl A 8967.80 8885,()() 5958035,()() N 601515,()()E 1092.37 S 2060,74 E
B 8967,80 8885.()() 5958120,()() N 6OJ905,()()E 1012,548 2451.83 E
C 8967,80 8885.()() 5957720,()() N 601985,(X) E 1413.568 2526.53 E
D 8967,80 8885,()() 5957635,()() N 601595,(X)E 1493.408 2135,44E
)
o
600
400 800 1200
--L --L -
: 10oa.OOft MD, 1000.0Oft TVD
',1299.86ftTVD
aDO.ootl MO, 1799.45tt TVD -
Begin Olr @ 3.00°/1000 : 3500,OOft MD, 3499.45ft rVD
4419.561t MD, 4383.89ft TVD
o
Properties
5959100.01 N, 599439.99 E
1894.29 N, 1835.53 W
70" 17' 51.6855" N, 1490 11' 40.9B98" WI L
82.80ft above Mean Sea Level -400
82.80ft above Structure Reference
True NDrth
Feet
1500.000 MD, 1499.59ft TVD
.OOD/100ft
Dir!@
Begi
o
-400
)
;:::c
",
n
",
-
<
",
o
J>
i:U
en
£
-800 0
:::: 0
þQo n-¡
gg? 0
::,--Cf)
Q2{ 0
&5=> 01
C!)())
~ 25
-1200 3 C>
3 C>
ü;-
en
õ'
~
~,oo
' , >",
\ "', ~
/
978e.91ftMD,9142,8OftTVD
2400
Reference is True North
Total Depth
2000
1600
Hold Angle at 27.5870
J r
- -
800 1200
Eastings
-800
-1200
(j)
0)
.~
J::
t
o
Z
.t::
o
o
'<t
II
.c
()
.s:
.-
Qj
ro
()
C/J
o 400
Scale: 1 inch = 400ft
Sperry-Sun Drilling Services
Proposal Data - Z-39 - Z-39 Wp2
)
)
DrillQuest
.:b
ši;"
[f!.
J:b
$.;)
-..:
:þ. QIo D .::::0
g.œ ~ ~
If? <:) t}
CD fi 07 ,-,..,
('".) ~ --
~ g ~
~ r--
(1,). . · I
&. t::7
:::J
1 -
17:30
4 December, 2000
)
North Slope Alaska
Alaska DriJ/ing & wells
peU_ WOA Z pad
Z..39 wp2
40.9898" W)
)
149011
99439.99 E (70017' 51.6855" N,
: 82.80tt above Mean Sea L.evel
surface Coordinates: 5959100.
KeffY 8uS"
proposal Ref: pro10625
:::=0
ïM
("")
m
-
<
m
o
o
fT\
(")
0>
01
I'-.::J
<::>
C>
<:::>
:;:.
ai'
Ch
Š
Q
Qo
>ø
::;'a:.
0(1)
-:::rC")
~o
~~
CD .
C"'
o
:3
:3
c;)"
(I)
õ·
~
Sperry-Sun Drilling Services
Proposal Report for Z-39 Wp2
Alaska Drilling & Wells
PBU_WOAZ Pad
Comment
Vertical
Section
Dogleg
Rate
e/100ft)
Coordinates
Eastings
Globa
Northings
Local Coordinates
Northings Eastings
(ft) (ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
ncl
Measured
Depth
(ft)
)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(ft)
599439.99 E
599439.99 E
599439.99 E
599439.99 E
599439.99 E
N
N
N
N
N
(ft)
5959100.01
5959100.01
5959100.01
59100.D1
9100.01
0.00 E
0.00 E
0.00 E
0.00 E
0.00 E
0.00 N
0.00 N
0.00 N
0.00 N
O.OON
0.00
100.00
200.00
300.00
400.00
-82.80
17.20
117.20
217.20
317.20
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00
100.00
200.00
300.00
400.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
599439.99 E
599439.99 E
599439.99 E
599439.99 E
599439.99 E
N
N
N
N
N
O.OON
0.00 N
0.00 N
0.00 N
0.00 N
500.00
600.00
700.00
800.00
900.00
417.20
517.20
617.20
717.20
817.20
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
500.00
600.00
700.00
800.00
900.00
Begin Dir @ 1.00°/1000 :
1000.00ft MD, 1000.00ft TVD
0.00
-0.83
-3.33
-7.50
-12.50
End Dir: 1300.000 MD,
1299.86ft TVD
Hold Angle at 3.000°
0.00
599430.74 E
5959109.26 N
9.13W
9.37 N
1399.73
316.93
315.758
3.000
400.00
~
rn
n
r-n
-
<
r-n
o
0.00
.00
.00
.00
)
Begin Dir @ 1.000/100ft :
1500.00ft MD, 1499.500 TVD
-17.50
-21.67
-24.17
-25.00
599439.99 E
599439.37 E
599437.52 E
599434.44 E
0.00
1.00
1.00
1.00
N
5959100.63 N
5959102.48 N
5959105.56 N
599427.04 E
599423.95 E
599422.10 E
599421.48 E
5959100.01
0.61 W
2.44W
5.48 W
000.00
1099.99
1199.96
1299.86
5959112.96 N
5959116.05 N
5959117.90 N
5959118.52 N
917.20
1017.19
1117.16
1217.06
12.78 W
15.82 W
17.65 W
18.26 W
0.000
315.758
315.758
315.758
13.12 N
16.25 N
18.12 N
18.75 N
0.000
1.000
2.000
3.000
1499.59
1599.49
1699.46
1799.45
1000.00
1100.00
1200.00
1300.00
416.79
1516.69
1616.66
1716.65
o
,."
('")
0.
C11
~
~
C>
C>
315.758
315,758
315.758
0.000
3.000
2.000
1.000
0.000
500.00
1600.00
1700.00
1800.00
.1>
iù
en
Š
Q
Qo
G)
~
(f)
o
o
:::J
!'"
C")
o
3
3
0"
rn
õ'
::s
End Dir : 1800.00ft MD,
1799.45ft TVD
-25.00
-25.00
-25.00
-25.00
-25.00
-25.00
0.00
0.00
0.00
0.00
0.00
0.00
599421.48 E
599421 .48 E
599421 .48 E
599421 .48 E
599421.48 E
599421.48 E
5959118.52 N
5959118.52 N
5959118.52 N
5959118.52 N
5959118.52 N
5959118.52 N
18.26 W
18.26 W
18.26 W
18.26 W
18.26 W
18.26 W
18.75 N
18.75 N
18.75 N
18.75 N
18.75 N
18.75 N
1899.45
1999.45
2099.45
2199.45
2299.45
2332.80
816.65
1916.65
2016.65
2116.65
2216.65
2250.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1900.00
2000.00
2100.00
2200.00
2300.00
2333.35
SV-3
Continued..
DrillQuest 2.00.05
2
4 December, 2000 - 17:30
Sperry-Sun Drilling Services
Proposal Report for Z-39 Wp2
Alaska Dri ng & Wells
PBU_WOAZ Pad
Comment
Vertical
Section
Dogleg
Rate
(0/100ft)
Global Coordinates
Northings Eastings
Eastings
(ft)
Local Coordinates
Northings
(ft)
Vertical
Depth
ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
Incl
Measured
Depth
(ft)
)
SV-2
-25.00
-25.00
-25.00
-25.00
-25.00
0.00
0.00
0.00
0.00
0.00
(ft)
599421.48 E
599421.48 E
599421.48 E
599421.48 E
599421.48 E
(ft)
5959118.52 N
5959118.52 N
5959118.52 N
,959118,52 N
9118,52N
18.26 W
18.26 W
18.26 W
18.26 W
18.26 W
18.75 N
18.75 N
18.75 N
18.75 N
18.75 N
2399.45
2499.45
2502.80
2599.45
2699.45
2316.65
2416.65
2420.00
2516.65
2616.65
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2400.00
2500.00
2503.35
2600.00
2700.00
SV-1
-25.00
-25.00
-25.00
-25.00
-25.00
0.00
0.00
0.00
0.00
0.00
599421.48 E
599421.48 E
599421.48 E
599421.48 E
599421.48 E
18.52 N
5959118.52 N
5959118.52 N
5959118.52 N
5959118.52 N
18.75 N
18.75 N
18.75 N
18.75 N
18.75 N
2799.45
2842.80
2899.45
2999.45
3099.45
2716.65
2760.00
2816.65
2916.65
3016.65
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2800.00
2843.35
2900.00
3000.00
3100.00
UG-4
-25.00
-25.00
-25.00
-25.00
-25.00
0.00
0.00
0.00
0.00
0.00
599421 .48 E
599421 .48 E
599421.48 E
599421 .48 E
599421 .48 E
5959118.52 N
5959118.52 N
5959118.52 N
5959118.52 N
5959118.52 N
3172.80
3199.45
3299.45
3399.45
3499.45
3090.00
3116.65
3216.65
3316.65
3416.65
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
)
Begin Dir @ 3.00°/1000 :
3500.000 MD, 3499.45ft TVD
-22.38
-14.54
-1.49
13.87
16.73
3.00
3.00
3.00
3.00
3.00
599423.80 E
599430.72 E
599442.25 E
599455.81 E
599458.35 E
5959117.29 N
5959113.61 N
5959107.49 N
5959100.29 N
5959098.95 N
15.96 W
9.08W
2.36 E
15.83 E
18.34 E
17.49 N
13.72 N
7.45 N
0.07N
1.31 S
3599.41
3699.09
3798.22
3882.80
3896.53
3516.61
3616.29
3715.42
3800.00
3813.73
118.721
118.721
118.721
118.721
118.721
3.000
6.000
9.000
11 .579
12.000
UG-1
40.08
68.47
101.85
140.11
183.16
3.00
3.00
3.00
3.00
3.00
599478.96 E
599504.05 E
599533.53 E
599567.32 E
599605.34 E
5959088.00 N
5959074.69 N
5959059.03 N
5959041.09 N
5959020.91 N
38.81 E
63.72 E
92.99 E
126.54 E
164.29 E
12.52 S
26.17 S
42.21 S
60.60 S
81.28 S
3993.76
4089.63
4183.88
4276.26
4366.51
3910.96
4006.83
4101.08
4193.46
4283.71
118.721
118.721
118.721
118.721
118.721
15.000
18.000
21.000
24.000
27.000
3173.35
3200,00
3300,00
"7"'1 3400.00
,- 3500.00
in
r'\
m 3600.00
_ 3700.00
<3800.00
3885.97
m 3900.00
o
4000.00
4100.00
4200.00
4300.00
4400.00
o
FT\
(")
o
01
~
C>
C>
<::>
>
~
6f
º
QO
>G:I
:::1$:1)
g.c:n
oC")
-'0
~~
CD·
C")
o
3
3
C¡¡'
5!?
o
':3
Continued..
Drl/lQuest 2.00.05
3
17:30
4 December, 2000
Sperry-Sun Drilling Services
Proposal Report for Z-39 Wp2
Alaska Drilling & Wells
PBU_WOAZ Pad
Comment
Vertical
Section
Dogleg
Rate
(0/100ft)
Global Coordinates
Northings Eastings
Local Coordinates
Northings Eastings
(ft) (ft)
Vertical
Depth
ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
Incl
Measured
Depth
(ft)
(ft)
(ft)
)
End Dir: 4419.56ft MO,
4383.89ft TVD
192.13
194.83
229.59
249.45
276.17
3.00
3.00
0.00
0.00
0.00
599613.27 E
599615.65 E
599646.35 E
599663.89 E
599687.49 E
5959016.70 N
172.16 E
85.59 S
86.89 S
103.59 S
113.14 S
125.98 S
4383.89
4389.05
4455.08
4492.80
4543.57
4301.09
4306.25
4372.28
4410.00
4460.77
118.721
118.721
118.721
118.721
118.721
27.587
27.762
27.762
27.762
27.762
4419.56
4425.38
4500.00
4542.63
4600.00
WS1
CM-3
322.75
369.33
375.78
415.91
462.49
0.00
0.00
0.00
0.00
0.00
599728.63 E
599769.78 E
599775.47 E
599810.92 E
599852.06 E
5958955.46 N
5958933.61 N
5958930.59 N
5958911.77 N
5958889.93 N
148.36 S
170.74 S
173.85 S
193.13 S
215.51 S
4632.06
4720.55
4732.80
4809.03
4897.52
4549.26
4637.75
4650.00
4726.23
4814.72
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
4700.00
4800.00
4813.85
4900.00
5000.00
509.06
555.64
602.22
648.80
695.38
0.00
0.00
0.00
0.00
0.00
599893.20 E
599934.34 E
599975.48 E
600016.62 E
600057.76 E
5958868.09 N
5958846.25 N
5958824.41 N
5958802.57 N
5958780.73 N
4986.01
5074.50
5162.99
5251.48
5339.97
4903.21
4991.70
5080.19
5168.68
5257.17
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
5100.00
5200.00
5300.00
5400.00
5500.00
)
741.96
788.54
835.12
881.70
928.28
0.00
0.00
0.00
0.00
0.00
600098.90 E
600140.05 E
600181.19 E
600222.33 E
600263.47 E
5958758.89 N
5958737.04 N
5958715.20 N
5958693.36 N
5958671.52 N
654.34 E
695.19 E
736.04 E
776.89 E
817.74 E
349.81 S
372.20 S
394.58 S
416.96 S
439.35 S
5428.46
5516.95
5605.44
5693.93
5782.42
5345.66
5434.15
5522.64
5611.13
5699.62
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
5600.00
5700.00
5800.00
5900.00
6000.00
~
m
()
m
-
<
m
o
o
rr'1
(")
o
CJ1
~
c::>
c::>
<:;)
974.85
1021.43
1068.01
1114.59
1161.17
0.00
0.00
0.00
0.00
0.00
600304.61 E
600345.75 E
600386.89 E
600428.03 E
600469.17 E
5958649.68 N
5958627.84 N
5958606.00 N
5958584.16 N
5958562.32 N
858.59 E
899.43 E
940.28 E
981.13E
1021.98 E
461.73 S
484.11 S
506.50 S
528.88 S
551.27 S
5870.91
5959.40
6047.89
6136.38
6224.86
5788.11
5876.60
5965.09
6053.58
6142.06
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
6100.00
6200.00
6300.00
6400.00
6500.00
þ
~
6f
Q
20
»c;>
::ssu
°en
=:s"ö
=:0
su::s
(Den
CD .
Ö
o
3
3
êji"
CI)
õ·
::s
Continued..
DrillQuest 2.00.05
4
17:30
4 December, 2000
Sperry-Sun Drilling Services
Proposal Report for Z-39 Wp2
Alaska Drilling & Wells
PBU_WOAZPad
Comment
Vertical
Section
Dogleg
Rate
(0/100ft)
Global Coordinates
Northings Eastings
(ft) (ft)
Coordinates
Eastings
Local
Northings
(ft)
Vertical
Depth
ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
Incl
Measured
Depth
(ft)
)
THRZ
1207.75
1254.33
1270.62
1300.91
1347.49
0.00
0.00
0.00
0.00
0.00
600510.32 E
600551.46 E
600565.85 E
600592.60 E
600633.74 E
5958540.47 N
5958518.63 N
5958510.99 N
958496.79 N
8474.95 N
(ft)
1062.83 E
1103.68 E
1117.97E
1144.53 E
1185.37 E
573.65 S
596.03 S
603.86 S
618.42 S
640.80 S
6313.35
6401 .84
6432.80
6490.33
6578.82
6230.55
6319.04
6350.00
6407.53
6496.02
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
6600.00
6700.00
6734.98
6800.00
6900.00
1394.07
1396.95
0.00
0.00
600674.88 E
600677.43 E
663.18 S
664.57 S
6667.31
6672.79
6584.51
6589.99
118.721
118.721
27.762
27.762
7000.00
7006.19
Hold Angle at 27.587°
BHRZ
TKUP
1402.22
1440.65
1487.22
0.00
0.00
0.00
600682.08 E
600716.02 E
600757.16 E
5958449.29 N
5958431.27 N
5958409.43 N
6682.80
6755.80
6844.29
6600.00
6673.00
6761.49
118.721
118.721
118.721
27.762
27.762
27.762
7017.50
7100.00
7200.00
TMLV
1496.97
1533.80
1580.38
1626.96
1673.54
0.00
0.00
0.00
0.00
0.00
600765.77 E
600798.30 E
600839.45 E
600880.59 E
600921.73 E
5958404.86 N
5958387.59 N
5958365.75 N
5958343.90 N
5958322.06 N
6862.80
6932.78
7021.27
7109.76
7198.25
6780.00
6849.98
6938.47
7026.96
7115.45
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
7220.92
7300.00
7400.00
7500.00
7600.00
)
1720.12
1766.70
1813.28
1818.06
1828.59
0.00
0.00
0.00
0.00
0.00
600962.87 E
601004.01 E
601045.15 E
601049.37 E
601058.67 E
5958300.22 N
5958278.38 N
5958256.54 N
5958254.30 N
5958249.36 N
1512.16E
1553.01 E
1593.86 E
1598.05 E
1607.29 E
819.87 S
842.25 S
864.64 S
866.93 S
871.99 S
7286.74
7375.23
7463.72
7472.80
7492.80
7203.94
7292.43
7380.92
7390.00
7410.00
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
7700.00
7800.00
7900.00
7910.26
7932.87
:;:;c
in
()
in
-
<
in
C1
o
rrt
(")
o
01
~
<::;)
o
o
TKNG
TJG
TJF
1859.86
1906.44
1953.02
1986.50
1999.59
0.00
0.00
0.00
0.00
0.00
601086.29 E
601127.43 E
601168.57 E
601198.15 E
601209.72 E
5958234.70 N
5958212.86 N
5958191.02 N
5958175.31 N
5958169.18 N
1634.71 E
1675.56 E
1716.41 E
1745.77 E
1757.25 E
887.02 S
909.40 S
931.79 S
947.88 S
954.17 S
7552.21
7640.70
7729.18
7792.80
7817.67
7469.41
7557.90
7646.38
7710.00
7734.87
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
8000.00
8100.00
8200.00
8271.89
8300.00
J>
ii)
(J)
Š-
Q
J:!o
>ø
::SA)
Om
::To
~Q
~::>
C!)'"
C'
o
:3
:3
if
õ·
..,
Continued..
Dril/Quest 2.00.05
5
17:30
4 December, 2000
Sperry-Sun Drilling Services
Proposal Report for Z-39 Wp2
Alaska Dri n9 & Wells
PBU_WOA Z Pad
Comment
Vertical
Section
Dogleg
Rate
("/100ft)
Global Coordinates
Northings Eastings
Local Coordinates
Northings Eastings
(ft) ~t)
Vertical
Depth
ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
Incl
Measured
Depth
(ft)
')
/
TJE
2046.17
2092.75
2097.04
2139.33
2185.91
0.00
0.00
0.00
0.00
0.00
(ft)
601250.86 E
601292.00 E
601295.79 E
601333.14 E
601374.28 E
(ft)
5958147.33 N
5958125.49 N
5958123.48 N
958103.65 N
58081.81 N
1798.10 E
1838.95 E
1842.71 E
1879.80 E
1920.65 E
976.55 S
998.94 S
1001.00 8
1021.32 S
1043.70 S
7906.16
7994.65
8002.80
8083.14
8171 .63
7823.36
7911 .85
7920.00
8000.34
8088.83
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
8400.00
8500.00
8509.21
8600.00
8700.00
TJD
2228.64
2232.49
2279.07
2325.65
2328.65
0.00
0.00
0.00
0.00
0.00
601412.02 E
601415.42 E
601456.56 E
601497.70 E
601500.35 E
61.78 N
5958059.97 N
5958038.13 N
5958016.29 N
5958014.88 N
1064.24 S
1066.098
1088.47 8
1110.85 S
1112.30 S
8252.80
8260.12
8348.61
8437.10
8442.80
8170.00
8177.32
8265.81
8354.30
8360.00
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
8791.73
8800.00
8900.00
9000.00
9006.44
TJC
TJB
TJA
2372.23
2418.81
2441.82
2465.39
2468.14
0.00
0.00
0.00
0.00
0.00
601538.84 E
601579.99 E
601600.31 E
601621.13 E
601623.56 E
5957994.45 N
5957972.61 N
5957961.81 N
5957950.76 N
5957949.47 N
8525.59
8614.08
8657.80
8702.57
8707.80
8442.79
8531.28
8575.00
8619.77
8625.00
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
9100.00
9200.00
9249.41
9300.00
9305.91
)
TSGR
Shublik A
Shublik B
2511.96
2520.78
2533.94
2557.62
2558.54
0.00
0.00
0.00
0.00
0.00
601662.27 E
601670.05 E
601681.67 E
601702.60 E
601703.41 E
5957928.92 N
5957924.79 N
5957918.62 N
5957907.51 N
5957907.08 N
2206.59 E
2214.32 E
2225.86 E
2246.63 E
2247.44 E
1200.39 S
1204.62 S
1210.958
1222.33 S
1222.77 S
8791 .06
8807.80
8832.80
8877.80
8879.55
8708.26
8725.00
8750.00
8795.00
8796.75
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
9400.00
9418.92
9447.17
9498.02
9500.00
Shublik C
TSAD
POWC
2568.15
2594.47
2605.12
2605.63
2639.21
0.00
0.00
0.00
0.00
0.00
601711.90 E
601735.14 E
601744.55 E
601745.00 E
601774.66 E
5957902.58 N
5957890.24 N
5957885.24 N
5957885.00 N
5957869.26 N
2255.86 E
2278.94 E
2288.29 E
2288.73 E
2318.18 E
1227.39 S
1240.04 S
1245.168
1245.40 S
1261.54S
8897.80
8947.80
8968.04
8969.00
9032.80
8815.00
8865.00
8885.24
8886.20
8950.00
118.721
118.721
118.721
118.721
118.721
27.762
27.762
27.762
27.762
27.762
9520.63
9577.13
9600.00
9601.09
9673.19
AI
m
()
m
-
<
m
o
o
fTI
("')
o
01
'"
C>
C>
C>
»
6.i
en
,...
I»
Q
Qo
ÞG)
::II»
O(f)
=rC")
=:0
~~
(t) .
C")
o
3
3
ëñ"
en
õ'
::I
Continued..
DrillQuest 2.00.05
6
17:30
4 December, 2000
Sperry-Sun Drilling Services
Proposal Report for Z-39 Wp2
Alaska Drilling & Wells
PBU_WOA Z Pad
Comment
Vertical
Section
Dogleg
Rate
(0/100ft)
Global Coordinates
Northings Eastings
(ft) (ft)
Eastings
(ft)
Local Coordinates
Northings
(ft)
Vertical
Depth
(ft)
Sub-Sea
Depth
(ft)
Azim.
North Slope Alaska
Incl
Measured
Depth
(ft)
)
HOT
Total Depth:
9788.91ftMD,9142.80ftTVD
TDD
2647.11
2651.70
2693.11
2697.11
0.00
0.00
0.00
601781.64 E
601785.69 E
601822.27 E
5957865.55 N
5957863.40 N
5957843.98 N
2325.11 E
2329.13 E
2365.45 E
1265.33 S
1267.54 S
1287.44 S
9047.80
9056.53
9135.20
8965.00
8973.73
9052.40
118.721
118.721
118.721
27.762
27.762
27.762
9690,14
9700,00
9788,91
0.00
601825.80 E
N
1289.36 S
All data is in feet unless otherwise stated. Directions and coordinates are relative to
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
9142.80
9060.00
118.721
27.762
9797,50
The Dogleg Severity is in Degrees per 100 feet.
Vertical Section is from Well and calculated along an Azimuth of 118.55
)
i
š
o
== 0 ~
:þ Qo /"T1 "'"
5 g¡ (") ,."
:::r en ,.......
~C") 0. I J
~ g 01 ,."
ø~ ~ -
C":: c::> <::
o c::>
~ c::> ,."
¡:. \:)
1 OOO.OOft TVD g'
Based upon Minimum Curvature type calculations, at a Measured
The Bottom Hole Displacement is 2697.11 ft.. in the Direction of
Comment
nates
Eastings
(ft)
on Coord
Northings
(ft)
Sta
TVD
(ft)
Comments
Measured
Depth
(ft)
1499.59ft TVD
Begin Dir @ 1.000/100ft : 1000.00ft MD,
End Dir: 1300.00ft MD, 1299.86ft TVD
Hold Angle at 3.000°
Begin Dir @ 1.000/100ft : 1500.000 MD,
End Dir: 1800.00ft MD, 1799.45ft TVD
0.00 E
5.48 W
9.13W
12.78 W
18.26 W
0.00 N
5.63 N
9.37N
13.12 N
18.75 N
1000.00
1299.86
1399.73
1499.59
1799.45
1000.00
1300.00
1400.00
1500.00
1800.00
Continued..
DrillQuest 2.00.05
7-
17:30
4 December, 2000
,"--~,
, -----.
H 17735R
DATE
10/30/00
CHECK NO.
00177358
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
VENDOR ALASKAST AT
DISCOUNT NET
10
102500 CKI02500H
HANDL NG INST:
100.00
S/H - TERRIE HUB LE X4628
100.00
?- - 39
TOT AL ~
rItE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
100.00
J3PEX.PLQRATIQN (ALASKAh.JNQ.
.'.'þ.O~t3Q*-19~612.·...·.'.«} .ri ,i
',' ANQHORAGE;ALASKA99519-6612 < .' .,..,'
~i!!STNATlqjW;;,I!A~¡ÇþF, A$k!:AND
," , '". N~~~tGÞ~JitK ii,
·QtEVi;'LÄND. QHIO
'."'" .-'...,....' -....::. .,.;,..,:......,
No", '. ·',·,·,H', .'.. ,.1, l~Q Ç!,~8
. . . . _ .-. ........-_, ::..::l<~ .q~--
..:;-::,-:.::..:::..--..:-:.:...:,.:.'::':"':':.<::'"...,:.::,....-.:::.....::
cONsoÜokîED :CÔMMEflCIÄ.LAêcQÚNT::
..... .... . ....
.::::::> : .:-':.: .'. '. ..'-\;'>:"--"" t.::.- -··'>:.·r~ .....
'\.;</.:'.' ....·>,;·:.::·-.:¿iÒ:à--·;-:;r:::\: ..~.
.. ÖO 1 77358:: ,
, '
..--,... - .'- .'.
.. ... ....
. ...
',", ,>56:389<"',"
,',',' --¡.j"2 "
PAY
oNEi-fU~bt\tE~·&..PQ/l OO***~*i**'#~**~~*~.*******~~~¡*;~~~*~i:* ,Q5:DOLLAR
I
.. ....... .......
. ......
..... '.':": ........
..... .
..'......, .....: '-.--'.
.-.,,- -., ..
DATE .'.'"',,,'..."'" ,"
10/30/00 11
.:. . N9T:~LlD AFTER '20D~YS..
h-
.":".: :....::.,...... : -" . .':': -. ':':-',":<, .... ."
\\~".,..<: ) ',. ".'.j»,\'.:si·.i,.':*::·'..".'..,'.,.,',.,...,.."...,....""." {
': "( " ' ..,. ,.'.' .' ,} '..,
~;"''',t'¡ ~ ___ '::, >' :'~
. . ":~"'-"';
,i·> AMOUNT
$100.001
T òThè
9RDER
hOof ,,":"
~~:¿~. OF ALAŸ~Ëhi
30QJPORCUPINjEDRIÝ~
..
,ANCHORAGE
AK99501
III.?? j 58111 I:O~. 20 j811 51: 008~~ .11111
)
)
c
o
z
o
-t
~
::0
-
-t
m
-
z
-t
J:
-
en
:Þ
::0
m
:Þ
redrll --:::.._ann. disposal para req _
- UNIT# ~ ON/OFF SHORE C)/7
-
-
-
-
-
-
-
-
-
-
-
-
-
ìro p-; -
~>~~ J';
ÙJ t...;< ~
~1Lf:.-l-k -
I/Í<-.,
~~k ~
-~f'
-
---
~
0...""'\.\\"",- ~-\-~
-
-
Comments/Instructions:
PROGRAM: exp
Permit fee attached. . .
Lease number appropriate. . .
Unique well name and number. .
Well located in a defined pool.. . . . . . . . . . . . . .
Well located proper distance from drilling unit boundary.
Well located proper distance from other wells. . . . .
Sufficient acreage available in drilling unit.. . . . . .
If deviated, is well bore plat included.. . . . . . . . .
Operator only affected party.. . . . . . . . . . . . .
Operator has appropriate bond in force. . . . . . . .
Permit can be issued without conservation order. . .
Permit can be issued without administrative approval
Can permit be approved before 15-day wait.
WELL PERMIT CHECKLIST COMPANY
FIELD & POOL _ ' ) /.9.5
ADMINISTRATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
ZPR DATç
D ~DD
ENGINEERING
30.
31.
32.
A~ I DA~ 33.
~ (... ,Db 34.
ANNULAR DlSPOSAL,35. With proper cementing records, this plan .
(A) will contain waste in a suitable receiving zone;
(B) will not contaminate freshwater; or cause drilling waste
to surface;
(C) will not impair mechanical integrity of the well used for disposal
(D) will not damage producing formation or impair recovery from a
pool; and
(E) will not circumvent 20
GEOLOGY:
~
Permit can be issued wlo hydrogen sulfide measures. ,L;.
Data presented on potential overpressure zones '* ~
Seismic analysis of shallow gas zones. . . . . . . . . .
Seabed condition survey (if off-shore). . . . . . . . . . . . .
Contact name/phone for weekly progress reports [exploratory only]
14. Conductor string provided . . . . . . . .
15. Surface casing protects all known USDWs. . . . .
16. CMT vol adequate to circulate on conductor & surf csg.
17. CMT vol adequate to tie-in long string to surf csg. . . .
18. CMT will cover all known productive horizons. . . . . .
19. Casing designs adequate for C, T, B & permafrost. . .
20. Adequate tankage or reserve pit.. . . . . . . . . . . .
21. If a re-drill, has a 10-403 for abandonment been approved.
22. Adequate wellbore separation proposed.. . . . . . .
23. If diverter required, does it meet regulations . . . . .
24. Drilling fluid program schematic & equip list adequate
25. BOPEs, do they meet regulation . . . . . . . .
26. BOPE press rating appropriate; test to
27. Choke manifold complies w/API RP-53 (May 84)
28. Work will occur without operation shutdown.
29. Is presence of H2S gas probable.
DATE
1::Z-;fÇ"
GEOLOGY
N
N
N
N
N
Y
Y
Y
Y
DATE
-
APPR
/fO
2t¡J
AAC 25.252 or 20 AAC 25.412. Y
- --
- --
ENGINEERING COMMISSION:
8~s Gof
JMH cjM 1+ i2
11/011100)
~5W
TE
~~8 jp
c:\msoffice\wordian\diana\checklist (rev.
~
,r--...
Well History File
APPENDIX
Information of detailed nature that is not
particulariy germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
"
,~
r----
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Sep 25 14:18:52 2002
Reel Header
Service name.............LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/09/25
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name.......UNKNOWN
Comments.......... ...... .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.............LISTPE
Date....... . . . . . . . . . . . . . .02/09/25
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments. ............... .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit (West) WOA
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW-22034
D. LABRECQUE
L. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 6
AK-MW-22034
T. GALVIN
A. MADSEN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MSL 0)
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
12.250
8.750
6.125
#
REMARKS:
Z-39
500292299500
B. P. Exploration (Alaska) Inc
Sperry-Sun Drilling Services
24-SEP-02
MWD RUN 2
AK-MW-22034
D. LABRECQUE
A. MADSEN
MWD RUN 5
AK-MW-22034
D. LABRECQUE
A. MADSEN
MWD RUN 7
AK-MW-22034
T. GALVIN
L. VAUGHN
19
UN
12E
4300
3237
86.04
52.80
CASING
SIZE (IN)
20.000
9.625
7.000
DRILLERS
DEPTH (FT)
80.0
3023.0
9273.0
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
~ D/)-¿;otf
lJo7i
~
~
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1 & 2 COMPRISED DIRECTIONAL WITH NATURAL
GAMMA PROBE (NGP)
UTILIZING SCINTILLATION DETECTORS.
4. MWD RUNS 3 & 4 MADE NO PROGRESS, THEREFORE NO DATA
WERE ACQUIRED.
5. MWD RUNS 5 & 6 COMPRISED DIRECTIONAL WITH DUAL GAMMA
RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4 (EWR4).
6. THE INTERVAL FROM 7128'MD TO 7281'MD WAS CORED
WITHOUT MWD TOOLS IN
THE BHA. MWD DATA FOR THIS INTERVAL WERE ACQUIRED
WHILST RIH FOR MWD
RUN 6.
7. MWD RUN 7 COMPRISED DIRECTIONAL WITH DGR; EWR4;
COMPENSATED THERMAL
NEUTRON POROSITY (CTN); AND STABILIZED LITHO-DENSITY
(SLD) .
8. THE DATA GAP IN THE EWR4 CURVES (9247.5'MD -
9272.2'MD) IS DUE TO A
COMBINATION OF A CASING RUN AND A SHORTENING OF THE
BIT-TO-SENSOR
DISTANCE FROM RUN 6 TO RUN 7. THE LAST 65' OF
DENSITY AND NEUTRON
DATA WERE LOST DUE TO A TOOL FAILURE.
9. POROSITY DATA WERE REPROCESSED USING A FORMATION
WATER SALINITY
VALUE OF 22,000 PPM CHLORIDES, INSTEAD OF THE
110,000 PPM VALUE USED
IN FIELD PROCESSING.
10. LOG AND MERGED DIGITAL DATA ONLY WERE SHIFTED TO THE
SCHLUMBERGER
WIRELINE GAMMA RAY LOG RUN ON 8 MARCH 2002. THESE
DATA WERE PROVIDED
TO SSDS BY DEWAYNE SCHNORR ON 5 APRIL 2002. ALL
HEADER DATA RETAIN
ORIGINAL DRILLERS' DEPTH REFERENCES.
11. MWD RUNS 1, 2, 5 - 7 REPRESENT WELL Z-39 WITH API#:
50-029-22995-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 9700'MD /
9216'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SGRD SMOOTHED NATURAL GAMMA RAY.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE
SPACING) .
SEMP = SMOOTHED PHASE
SPACING) .
SEDP = SMOOTHED PHASE
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE
MATRIX, FIXED HOLE
SIZE) .
CTFA SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE.
CTNA SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN) .
SHIFT-DERIVED RESISTIVITY ( SHALLOW
SHIFT-DERIVED RESISTIVITY (MEDIUM
SHIFT-DERIVED RESISTIVITY (DEEP
~
~,
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) .
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW-COUNT BIN) .
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZES: 6.125"
MUD WEIGHT: 8.7 PPG
MUD SALINITY: 28,000 PPM CHLORIDES
FORMATION WATER SALINITY: 22,000 PPM CHLORIDES
FLUID DENSITY: 1.0 GICC
MATRIX DENSITY: 2.65 GICC
LITHOLOGY: SANDSTONE
$
File Header
Service name....... ......STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/25
Maximum Physical Record..65535
File Type................ LO
Previous File Name..... ..STSLIB.OOO
Cormnent Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shi fted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPX
RPS
RPM
RPD
NCNT
FCNT
NPHI
PEF
DRHO
RHOB
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
55.0
243.5
3009.0
3009.0
3009.0
3009.0
3009.0
9235.0
9235.5
9236.0
9251.0
9277.5
9277.5
STOP DEPTH
9679.5
9702.0
9686.5
9686.5
9686.5
9686.5
9686.5
9575.5
9578.5
9575.5
9588.5
9588.0
9588.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
55.0
2847.0
2859.0
2864.5
2890.0
2937.5
2952.5
2975.5
2991. 0
3017.5
3026.5
3034.0
3058.0
3066.5
3095.5
3102.0
3112.5
3116.0
3127.0
3142.0
GR
59.0
2851. 0
2864.0
2869.0
2896.0
2941. 5
2957.0
2980.5
2994.0
3018.5
3027.5
3037.0
3061. 5
3068.5
3098.0
3104.5
3115.0
3118.5
3129.5
3144.5
/",
~
3145.5
3151. 5
3168.0
3173.0
3178.5
3186.0
3207.0
3232.5
3246.5
3265.5
3295.0
3305.5
3330.0
3334.5
3358.0
3364.0
3370.0
3373.5
3383.0
3386.0
3394.5
3407.5
3431. 0
3453.0
3457.0
3465.5
3497.0
3501. 0
3509.5
3517.0
3526.5
3550.0
3560.0
3563.5
3569.0
3578.0
3587.5
3614.0
3625.5
3635.5
3650.5
3653.5
3657.0
3690.0
3701. 5
3713.0
3735.5
3751.5
3759.0
3775.0
3784.5
3787.5
3792.0
3795.5
3798.0
3803.0
3814.0
3821. 5
3831. 0
3853.5
3863.0
3870.5
3873.5
3888.0
3912.5
3924.0
3934.5
3965.0
3968.5
3971.5
3986.0
3991.5
3994.5
3997.5
4000.0
4024.0
3147.5
3154.0
3169.5
3175.0
3180.0
3188.5
3209.0
3235.0
3249.0
3268.5
3298.0
3307.0
3333.0
3337.5
3358.5
3366.0
3372.0
3376.0
3385.0
3388.0
3396.0
3410.0
3433.0
3455.5
3459.5
3468.0
3499.5
3503.5
3512.0
3520.0
3529.0
3552.5
3562.0
3566.0
3571. 5
3580.5
3590.0
3617.0
3628.5
3638.5
3653.5
3656.5
3659.0
3692.5
3704.0
3715.5
3737.5
3753.5
3761.0
3776.5
3786.0
3790.5
3793.5
3797.5
3799.5
3805.0
3816.5
3824.0
3834.0
3855.5
3865.0
3871.0
3875.5
3889.5
3916.0
3927.0
3935.5
3967.0
3970.5
3974.0
3988.0
3994.0
3996.0
3998.5
4002.5
4025.5
~,
/-",
4030.0
4052.0
4061. 0
4065.5
4067.5
4078.5
4087.5
4090.5
4109.5
4137.5
4141.5
4151. 5
4162.5
4176.5
4193.0
4200.5
4207.5
4210.5
4217 . 5
4226.5
4237.0
4252.0
4272.5
4274.5
4302.5
4306.5
4320.5
4323.5
4336.5
4338.5
4342.0
4346.5
4354.0
4358.0
4373.0
4380.0
4387.0
4390.5
4406.0
4409.5
4430.5
4437.5
4453.5
4458.0
4462.5
4471.0
4490.0
4494.0
4501. 5
4512.0
4520.5
4528.5
4535.0
4537.5
4546.5
4554.5
4559.0
4563.5
4566.5
4567.5
4570.5
4577.0
4581. 0
4590.5
4595.5
4609.0
4629.5
4634.0
4641.0
4654.0
4658.5
4679.5
4705.0
4719.5
4737.0
4751.0
4032.0
4054.0
4063.5
4067.0
4068.5
4080.0
4088.5
4092.0
4110.0
4139.5
4145.5
4153.5
4164.0
4178.0
4195.0
4203.0
4210.5
4213.5
4219.5
4228.5
4237.0
4253.5
4275.0
4276.0
4304.5
4308.5
4321. 0
4324.5
4338.5
4340.5
4343.5
4348.0
4355.5
4359.5
4374.5
4381.5
4388.5
4392.0
4407.0
4411.0
4431.0
4438.0
4454.0
4458.0
4461.5
4470.0
4491.0
4494.0
4501. 5
4512.0
4520.0
4529.0
4535.0
4537.5
4546.5
4555.0
4558.5
4563.0
4566.0
4567.5
4570.0
4576.5
4580.0
4591. 0
4595.5
4608.5
4629.0
4634.0
4641. 0
4654.0
4657.5
4680.0
4704.5
4719.5
4736.5
4750.5
~,
~
4765.0
4777.0
4785.5
4809.5
4814.5
4830.5
4837.0
4850.0
4872.0
4875.5
4890.0
4898.5
4936.0
4958.5
5005.5
5020.5
5035.0
5036.5
5043.5
5046.5
5072.0
5087.5
5111.0
5130.5
5149.5
5161. 5
5167.0
5202.5
5228.5
5234.5
5246.5
5263.0
5281. 0
5297.5
5304.0
5317.5
5336.0
5338.5
5353.5
5380.5
5393.5
5414.5
5420.0
5441.0
5456.5
5463.5
5485.5
5513.5
5519.0
5529.0
5537.5
5540.0
5559.0
5565.5
5568.0
5577.5
5594.5
5605.5
5610.0
5613.5
5633.5
5660.5
5677.0
5687.5
5706.5
5719.5
5736.5
5772.5
5781.5
5796.0
5817.5
5837.5
5877.5
5917.0
5928.0
5962.0
4765.0
4775.5
4784.5
4808.5
4813.5
4829.5
4836.0
4849.0
4870.5
4874.0
4889.0
4897.5
4935.0
4957.0
5004.5
5019.5
5033.5
5035.5
5042.0
5045.5
5073.0
5088.0
5110.5
5130.0
5147.0
5160.5
5166.0
5200.5
5228.0
5233.0
5246.0
5261. 5
5278.5
5296.0
5302.0
5316.5
5335.0
5337.5
5353.0
5379.5
5393.0
5413.5
5419.0
5441.0
5456.5
5464.0
5484.0
5512.5
5517.5
5528.0
5536.5
5538.0
5557.0
5564.5
5566.5
5576.5
5592.5
5603.0
5608.0
5611.5
5631. 5
5658.5
5676.0
5687.5
5705.0
5717.5
5734.5
5770.5
5782.0
5793.5
5815.0
5835.5
5875.0
5914.0
5926.5
5960.5
/'
/~
5969.5
5985.5
6005.5
6038.0
6058.0
6062.5
6070.5
6073.0
6085.0
6091. 5
6126.0
6134.0
6135.5
6146.0
6147.5
6163.5
617 5.5
6187.0
6192.0
6216.0
6235.0
6252.5
6265.0
6271. 5
6286.0
6302.0
6310.5
6329.0
6346.0
6360.0
6410.5
6417.0
6467.0
6491. 0
6497.0
6516.0
6547.5
6562.5
6573.5
6656.0
6672.0
6699.5
6707.5
6714.5
6735.0
6745.5
6763.0
6797.5
6802.0
6818.0
6825.5
6832.0
6834.5
6840.0
6845.5
6876.5
6888.5
6898.0
6910.0
6919.0
6953.5
6956.5
6962.5
7001. 5
7015.5
7022.5
7036.0
7065.0
7082.5
7104.0
7111.0
7120.5
7126.5
7134.5
7150.5
7172.5
5967.0
5984.0
6004.5
6035.5
6055.5
6060.5
6068.0
6071. 0
6083.0
6089.0
6123.5
6131. 5
6133.5
6144.0
6146.0
6161. 0
6172 . 5
6183.5
6189.0
6213.0
6233.0
6250.5
6262 . 0
6267 . 5
6282.0
6300.0
6308.0
6326.5
6343.5
6358.0
6407.5
6414.5
6465.5
6489.5
6495.0
6513.5
6547.0
6561. 5
6572.5
6655.0
6670.5
6697.5
6707.0
6713.0
6734.0
6743.5
6761.0
6794.5
6799.5
6815.5
6823.5
6830.0
6833.0
6839.0
6842.0
6874.5
6886.0
6895.5
6909.5
6917 . 0
6952.5
6955.5
6961. 5
7000.0
7015.5
7022.5
7036.0
7063.5
7080.5
7103.0
7109.0
7119.0
7126.5
7133.0
7149.5
7171.5
7190.0
7198.0
7211.5
7213.0
7226.5
7236.0
9702.0
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
#
REMARKS:
~.
7189.0
7196.5
7211.0
7213.0
7225.5
7234.0
9700.0
BIT RUN NO
1
2
5
6
7
MERGED MAIN PASS.
$
MERGE TOP
59.0
344.0
3038.0
7126.0
9288.0
MERGE BASE
344.0
3038.0
7126.0
9288.0
9700.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction...... .......... . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing................. ... .60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CNTS 4 1 68 36 10
NCNT MWD CNTS 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD BARN 4 1 68 52 14
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
Service unit
FT
MWD FT/H
MWD API
MWD OHMM
MWD OHMM
MWD OHMM
MWD OHMM
MWD HOUR
MWD PU-S
MWD CNTS
MWD CNTS
MWD G/CM
MWD G/CM
MWD BARN
Min
55
0.2
20.42
0.34
0.38
0.45
0.32
0.09
9.57
134.29
13539.5
2.11
-0.07
0.63
Max
9702
1500.74
490.65
1834.59
2000
2000
2000
134.15
53.01
1626.41
39762.9
4.42
1. 97
12.21
First Reading For Entire File..........55
Last Reading For Entire File...........9702
File Trailer
Service name.............STSLIB.001
Service Sub Level Name...
Mean
4878.5
152.225
92.5724
4.50279
6.46533
7.02556
7.43711
3.96548
21. 7351
693.894
28066.5
2.45881
0.092508
3.17623
Nsam
19295
18918
19250
13305
13305
13305
13305
13307
680
687
682
622
622
676
,~,
First
Reading
55
243.5
55
3009
3009
3009
3009
3009
9236
9235.5
9235
9277.5
9277.5
9251
Last
Reading
9702
9702
9679.5
9686.5
9686.5
9686.5
9686.5
9686.5
9575.5
9578.5
9575.5
9588
9588
9588.5
~,
Version Number....... . . . .1.0.0
Date of Generation.......02/09/25
Maximum Physical Record..65535
File Type............ ....LO
Next File Name......... ..STSLIB.002
Physical EOF
File Header
Service name.............STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/25
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
.,....--..\
header data for each bit run in separate files.
1
.5000
START DEPTH
59.0
247.5
STOP DEPTH
285.0
344.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
NGP
$
BOTTOM)
TOOL TYPE
NATURAL GAMMA PROBE
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
26-FEB-02
Insite
66.37
Memory
344.2
59.0
344.2
.0
.7
TOOL NUMBER
PBO-24HRG6
12.250
80.0
SPUD MUD
9.50
301. 0
9.4
350
11. 5
.000
.000
.000
.000
.0
86.5
.0
.0
/"".
~,
JI
REMARKS:
$
JI
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing........ ............ .60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units............... ........
Datum Specification Block sub-type...O
Service Order
Units
FT
FT/H
API
Size
4
4
4
Code
Offset
o
4
8
Channel
1
2
3
Name
DEPT
ROP
GR
MWD010
MWD010
Nsam Rep
1 68
1 68
1 68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 59 344 201. 5 571 59 344
ROP MWD010 FT/H 9.99 652.78 133.494 194 247.5 344
GR MWD010 API 41.01 88.24 52.5103 453 59 285
First Reading For Entire File..........59
Last Reading For Entire Fi1e...........344
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.... ...02/09/25
Maximum Physical Record..65535
File Type................LO
Next File Name...........STSLIB.003
Physical EOF
File Header
Service name... ......... .STSLIB.003
Service Sub Level Name...
Version Number. . . . . . . . . . .1. 0.0
Date of Generation.. .....02/09/25
Maximum Physical Record..65535
File Type................LO
Previous File Name. ......STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
JI
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
285.5
344.5
STOP DEPTH
2979.0
3038.0
JI
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
28-FEB-02
Insite
66.37
Memory
,~
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
NGP
$
BOTTOM)
TOOL TYPE
NATURAL GAMMA PROBE
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction......... ....... . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.............. ...... .60 .lIN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units............... ........
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
ROP MWD020
GR MWD020
Size
4
4
4
Nsam Rep Code
1 68
1 68
1 68
Units
FT
FT/H
API
,--------,
3038.0
344.2
3038.0
1.3
26.8
TOOL NUMBER
PBO-24HRG6
12.250
80.0
SPUD MUD
9.50
301. 0
9.0
400
11. 5
.000
.000
.000
.000
.0
86.2
.0
.0
Offset
o
4
8
Channel
1
2
3
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 285.5 3038 1661. 75 5506 285.5 3038
ROP MWD020 FT/H 1.19 717 .12 175.949 5388 344.5 3038
GR MWD020 API 21. 51 100.77 59.0616 5388 285.5 2979
First Reading For Entire File. ........ .285.5
Last Reading For Entire File...........3038
File Trailer
Service name........ .....STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/25
~
./---'\
Maximum Physical Record. .65535
File Type................LO
Next File Name... ....... .STSLIB.004
Physical EOF
File Header
Service name.............STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/09/25
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.003
Conunent Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
j¡
FILE SUMMARY
VENDOR TOOL CODE
GR
RPS
FET
RPD
RPX
RPM
ROP
$
4
header data for each bit run in separate files.
5
.5000
START DEPTH
2979.5
3010.5
3010.5
3010.5
3010.5
3010.5
3038.5
STOP DEPTH
7095.5
7087.5
7087.5
7087.5
7087.5
7087.5
7126.0
j¡
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
05-MAR-02
Insite
66.37
Memory
7127.7
3038.0
7127.7
15.6
27.1
j¡
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
TOOL NUMBER
PBO-24HRG6
PBO-24HRG6
j¡
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
8.750
3023.0
j¡
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
4% KCL
10.30
46.0
9.5
19500
5.0
.095
.060
.210
.300
78.0
132.8
78.0
78.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
~
~,
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.. ...0
Logging Direction.............. ...Down
Optical log depth units...........Feet
Data Reference Point... .......... .Undefined
Frame Spacing............. ....... .60 .lIN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units........... . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 2979.5 7126 5052.75 8294 2979.5 7126
ROP MWD050 FT/H 9.83 1500.74 161.471 8176 3038.5 7126
GR MWD050 API 21.3 388.86 106.447 8233 2979.5 7095.5
RPX MWD050 OHMM 0.34 1834.59 5.81064 8155 3010.5 7087.5
RPS MWD050 OHMM 0.38 2000 8.92254 8155 3010.5 7087.5
RPM MWD050 OHMM 0.45 2000 9.80613 8155 3010.5 7087.5
RPD MWD050 OHMM 0.32 2000 10.4321 8155 3010.5 7087.5
FET MWD050 HOUR 0.09 3.16 0.578703 8155 3010.5 7087.5
First Reading For Entire File...... ....2979.5
Last Reading For Entire File...........7126
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......02/09/25
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number..... . . . . . .1.0.0
Date of Generation... ....02/09/25
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
~"
,~,
DEPTH INCREMENT:
jf
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
.5000
START DEPTH
7088.0
7088.0
7088.0
7088.0
7088.0
7096.0
7126.5
STOP DEPTH
9248.0
9247.0
9247.0
9247.0
9247.0
9254.5
9288.0
jf
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
12-MAR-02
Insite
66.37
Memory
9288.0
7127.7
9288.0
8.1
15.7
jf
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
TOOL NUMBER
PB00062HRG6
PB00062HRG6
jf
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
8.750
3023.0
jf
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
4% KCL
10.30
57.0
9.5
20000
2.6
.550
.370
.200
.350
93.0
140.0
80.0
85.0
jf
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
jf
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
jf
REMARKS:
$
jf
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction......... ....... . Down
Optical log depth units...........Feet
Data Reference Point....... ...... . Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD060
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
,~,
-~,
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7088 9288 8188 4401 7088 9288
ROP MWD060 FT/H 0.2 583.49 119.49 4324 7126.5 9288
GR MWD060 API 43.05 251.86 114.84 4318 7096 9254.5
RPX MWD060 OHMM 0.45 38.9 1.87601 4319 7088 9247
RPS MWD060 OHMM 0.62 40.27 1.92493 4319 7088 9247
RPM MWD060 OHMM 0.68 47.51 1. 948 4319 7088 9247
RPD MWD060 OHMM 0.7 27.36 2.00362 4319 7088 9247
FET MWD060 HOUR 0.13 134.15 10.5809 4321 7088 9248
First Reading For Entire File...... ....7088
Last Reading For Entire File...........9288
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Version Number....... . . . .1. 0.0
Date of Generation.......02/09/25
Maximum Physical Record..65535
File Type................LO
Next File Name...........STSLIB.006
Physical EOF
File Header
Service name.............STSLIB.006
Service Sub Level Name...
Version Number....... . . . .1. 0.0
Date of Generation...... .02/09/25
Maximum Physical Record..65535
File Type................ LO
Previous File Name.. .....STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
PEF
GR
RPS
RPX
RPM
RPD
FET
RHOB
DRHO
ROP
$
6
header data for each bit run in separate files.
7
.5000
START DEPTH
9233.0
9233.5
9234.0
9249.0
9255.0
9273.0
9273.0
9273.0
9273.0
9273.0
9275.5
9275.5
9288.5
STOP DEPTH
9573.5
9576.5
9573.5
9586.5
9677.5
9684.5
9684.5
9684.5
9684.5
9684.5
9586.0
9586.0
9700.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
15-MAR-02
Insite
.~,
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
SLD
CTN
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
STABILIZED LITHO DEN
COMP THERMAL NEUTRON
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction...... .......... . Down
Optical log depth units.... ...... .Feet
Data Reference Point......... .... . Undefined
Frame Spacing.....................60 .lIN
Max frames per record.............Undefined
Absent value...................... -999
Depth units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.~
66.16
Memory
9700.0
9288.0
9700.0
7.6
8.2
TOOL NUMBER
PB00081HAGR4
PB00081HAGR4
PB00081HAGR4
PB00081HAGR4
6.125
9273.0
QUIKDRIL-N
8.70
42.0
9.4
28000
6.3
.350
.230
.190
.150
83.0
132.7
63.0
70.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HOUR 4 1 68 28 8
NPHI MWD070 PU-S 4 1 68 32 9
FCNT MWD070 CNTS 4 1 68 36 10
NCNT MWD070 CNTS 4 1 68 40 11
RHOB MWD070 G/CM 4 1 68 44 12
DRHO MWD070 G/CM 4 1 68 48 13
PEF MWD070 BARN 4 1 68 52 14
~
,~
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9233 9700 9466.5 935 9233 9700
ROP MWD070 FT/H 7.26 399.56 77.536 824 9288.5 9700
GR MWD070 API 20.42 490.65 79.6674 846 9255 9677.5
RPX MWD070 OHMM 1. 37 15.12 5.28487 824 9273 9684.5
RPS MWD070 OHMM 1. 41 19.33 5.90822 824 9273 9684.5
RPM MWD070 OHMM 1. 48 23.43 6.06822 824 9273 9684.5
RPD MWD070 OHMM 1. 66 27.56 6.22664 824 9273 9684.5
FET MWD070 HOUR 0.14 58.21 2.79222 824 9273 9684.5
NPHI MWD070 PU-S 9.57 53.01 21.7351 680 9234 9573.5
FCNT MWD070 CNTS 134.29 1626.41 693.894 687 9233.5 9576.5
NCNT MWD070 CNTS 13539.5 39762.9 28066.5 682 9233 9573.5
RHOB MWD070 G/CM 2.11 4.42 2.45881 622 9275.5 9586
DRHO MWD070 G/CM -0.07 1. 97 0.092508 622 9275.5 9586
PEF MWD070 BARN 0.63 12.21 3.17623 676 9249 9586.5
First Reading For Entire File....... ...9233
Last Reading For Entire Fi1e...........9700
File Trailer
Service name.............STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......02/09/25
Maximum Physical Record..65535
File Type................ LO
Next File Name..... ......STSLIB.007
Physical EOF
Tape Trailer
Service name.............LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/09/25
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................UNKNOWN
Continuation Number..... .01
Next Tape Name...........UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name.............LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/09/25
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number.... ..01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File