Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-117 ) ) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. J O.Q - 1 L 1 Well History File Identifier 0 Two-sided 1111111111111111111 Organizing (done) ~escan Needed 1111111111111111111 RESCAN ~olor Items: ~reYSCale Items:'.- 0 Poor Quality Originals: DIGITAL DATA ~Diskettes, No. J-- 0 Other, No/Type: OVERSIZED (Scannable) 0 Maps: 0 Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) 0 Other: 0 Logs of various kinds: BY: 0 Other:: , Date: '3, J Ó, tJ Lf 151 VV1 P ~ 1111111111111111111 . d Date£6 /ó 64' 151 1M P . ~ ~ (: + IS- 'f TOTAL PAGES 75"" ~~ Date:e ¡ 0 () If 151 ¡ýYJ P z.. Production Scanning 1II1I111I111111111 Page Count from Scanned File: I' (;; CÆ-Jc.fl/vI ~ et..&.~ Page Count Matches Number in Sc~nning Preparation: V YES NO Date:~,'~4: Ot - I~ Vl-1 fJ YES NO Helen ~ NOTES: Project Proofing BY: Helen ~ Scanning Preparation BY: Helen ~ ~~ x 30 = (0 () Stage 1 Stage 1 Helen e~ If NO in stage 1 page(s) discrepancies were found: BY: BY: Helen Maria Date: 151 Scanning is complete at this point unless rescanning is required. ReScanned 1I11II III II BY: Helen Maria Date: 151 Comments about this file: Quality Checked 1111111111111111111 8/9/2004 Well History File Cover Page.doc · STATE OF ALASKA I ALAS~IL AND GAS CONSERVATION COM SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Alaska Oil & Gas Cons. Commission RECEIVED JUL 1 4 2006 A 1a. Well Status: DOil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class: """"VI "1:1" 20AAC 25.105 20AAC 25.110 181 Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 4/7/2006 202-117 306-029 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 6/21/2002 50-029-20553-02-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 6/27/2002 PBU G-10B 2554' FNL, 2368' FEL, SEC. 12, T11N, R13E, UM 8. KB Elevation (ft): 15. Field 1 Pool(s): Top of Productive Horizon: 3613' FNL, 4334' FEL, SEC. 12, T11N, R13E, UM 70.34' Prudhoe Bay Field 1 Prudhoe Bay Total Depth: 9. Plug Back Depth (MD+ TVD) Pool 3487' FNL, 345' FEL, SEC. 11, T11 N, R13E, UM 11204 + 9022 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 657858 y- 5969087 Zone- ASP4 11241 + 9021 Ft ADL 028280 TPI: x- 655916 y- 5967987 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 654622 y- 5968086 Zone- ASP4 NIA MD DYes 181 No 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey NIA MSL 1900' (Approx.) 21. Logs Run: MWD, GR, ROP, Memory CNL, CCL 22. CASING, LINER AND CEMENTING RECORD ¢~SING ... ,". .. SETTING DEPTHiMD SËTTlNG DEPTH TVD HOLE "', ... ...... "\MU\l~1 } ·"SIZE.· Wr. PER FT. GRADE Top BOTTOM SIZE ,.' / POLLED, Top BOTTOM '..',..... 20" x 30" Insulated Conductor Surface 110' Surface 110' 36" Cement to Surface 13-3/8" 72# L-80 Surface 2686' Surface 2686' 17-112" 3500 sx AS II 20 sx Too Job 9-5/8" 47# L-80 Surface 9620' Surface 8776' 12-1/4" 1100 sx Class 'G' 140 sx AS I 7" 29# L-80 4149' 9620' 4079' 8776' 8-1/2" 1011 sx Class 'G' 2-3/8" 4.6# L-80 9498' 11241 ' 8698' 9021' 3" 72 sx Class 'G' 23. Perforations open to Production (MD + TVD of Top and 124. .. ~ .." ·i... Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None 3-1/2",9.3#, L-80 xxx' 4072' MD TVD MD TVD 125. '" ACID,r' r".. ...... ".,. Erc. > i'. ......,.,' .. ,-,"'VI"'" /' ?, ......' '~C \N'\V"'- 'U1 :¡ 1":' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED "> ,';-.~J )t:tJ,j L {-Jr' r) 9485' Set CIBP 9468' Set Whipstock 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production NIA Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-Bsl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD + Flow Tubing Casing Pressure CALCULATED Oll-Bsl GAs-McF WATER-Bsl Oil GRAVITY-API (CORR) Press. 24-HoUR RATE'" 27. <. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS BFl ,iUL 1 7 2006 Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE OR\G\NAL 6 28. GEOLOGIC MARKE 29. ORMATION TESTS NAME MD TVD Include and brie y summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". 23SB 9650' 8798' None 25N 9695' 8832' 21TS 1 Zone 2A 9795' 8907' Zone 1 B 9905' 8978' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble 4 . Title Technical Assistant Date D 7 ~ "3 fora PBU G-108 Well Number 202-117 306-029 Permit NO.1 A roval No. Prepared By Name/Number: Drilling Engineer: Terrie Hubble, 564-4628 Ted Stagg, 564-4694 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only . . G-10B Prudhoe Bay Unit 50-029-20553-03 206-009 Accept: Spud: Release: Ri: PRE-RIG WORK 01/06/06 DRIFTED WI 1.75" CENT, UNABLE TO WORK THRU TIGHT SPOT AT 9600' SLM, LOST JAR ACTION. SET 3.5 KEYLESS X LOCK CATCHER AT 9468' SLM. TRIED MULTIPLE TIMES TO PULL STA #2 AT 3885' SLM. KEPT SLIPPING OFF WI ONE OJ LICK. GOT IMPRESSION OF RK LATCH WI LIB. GOT ONE PIECE OF FN ON JD DOGS. DIDN'T GET VALVE. SUGGEST USING DANIELS NEXT TIME. PULLED EMPTY 3.5 KEYLESS X LOCK CATCHER FROM 9468' SLM. RAN PDS CALIPER FROM 9461' SLM TO SURFACE. 01/29/06 DRIFTED WI 2.70" MODIFIED DUMMY WHIPSTOCK TO 9486' SLM (TOL), SAMPLE BAILER EMPTY. 01/30/06 PULLED 1.5" OGLV FROM STA#2 AT 3892' SLM. LRS PUMPED FULL VOLUME DOWN IA. SET 1.5" DUMMY VALVE - RK LATCH AT 3892' SLM. MITX IA TO 3000 PSI, FAILED, MIT X OA PASSED AFTER 3RD ATIEMPT RIH TO CONFIRM STA #1, #2 VALVES WERE FULLY IN THE POCKET. GOOD INDICATIONS ON BOTH STATIONS LRS MIT X IA TO 3000 PSI AGAIN, FAILED. 02110/06 SET 3 1/2" C-SUB AT 9486' SLM. PULL 1 1/2" RK-DGLV FROM STA 1. PULLED 1 1/2 RK-DUMMY FROM STATION #2 SET DUMMY VALVES WI EX1.PACKING IN STATION #1, #2. PULLED EMPTY C-SUB. 02125/06 LOGGED SCMT FROM 8500' TO 9550'. TOP OF CEMENT FOUND AT 9152'. NO PROBLEMS RIH OR POOH. WPP COMPLETION MAPPER RUN FROM 9495' - 8500'. FOUND TUBING CLOSE TO HIGH SIDE OF PIPE OVER MAJORITY OF LOGGING INTERVAL, DUE TO HIGH DOGLEGS HOLDING IT UP. 04/07/06 SET WEATHERFORD CIBP IN 3.5" LINER AT 9485 FT. TAPPED PLUG - GOOD. FINAL T/l/O 01120010. WELL LEFT SI. 05/19/06 SET WFD 3-1/2" LSX WHIPSTOCK. TOP OF WHIPSTOCK AT 9470' ORIENTED 7 DEGREES LEFT OF HIGH SIDE. CORRELATED TO SWS SCMT 25 FEB 06. 2 PIP TAGS LOCATED AT 9475.7'. TAGGED AFTER SET. BP EXPL ION Operations Summary Report Page 1 _ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 6/1/2006 Rig Release: 6/17/2006 Rig Number: N1 Spud Date: 3/27/1981 End: 6/17/2006 Dale From - To Hours Täsk Code NPT Phase Description of Operations 6/4/2006 15:30 - 16:30 1.00 RIGD P PRE Rig released from C-04B @ 15:30Hrs on 6/4/2006. Prep to move rig off well. 16:30 - 19:30 3.00 MOB N RREP PRE Jack up rig & observe control line hose to front booster leaking with ca. 1 TSP leak of hydraulic oil onto pad. Fetch new hose & replace control line. Test new control line - OK. Meanwhile C/O injector gripper blocks. 19:30 - 19:45 0.25 MOB P PRE PJSM for moving rig off well. 19:45 - 20:00 0.25 MOB P PRE Jack-up rig & pull rig off well. Conduct post-operations pad inspection. 20:00 - 20:15 0.25 MOB P PRE Held pre-move safety meeting with crew, security & tool services. 20:15 - 00:00 3.75 MOB P PRE Move rig from C-pad to G-pad. Meanwhile C/O injector gripper blocks. 6/5/2006 01 :00 - 01 :15 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for backing rig over well. 01 :15 - 01 :30 0.25 MOB P PRE Back rig over well & set down. ACCEPT RIG AT 01 :30 HRS ON 06/05/2006. 01 :30 - 01 :45 0.25 BOPSU P PRE PJSM for N/U BOPE. 01 :45 - 03:30 1.75 BOPSU P PRE N/U BOPE. 03:30 - 10:00 6.50 BOPSU P PRE Perform initial BOPE pressure / function test. AOGCC witness waived by Chuck Scheve. BOPE testing witnessed by BP WSLs. Meanwhile spot outside trailers & tanks. R/U hardline to CT reel. 10:00 - 13:00 3.00 RIGU P PRE Held PJSM on stabbing CT, R/U cable and pulley, P/U injector I head, Slip grapple into CT & pull test. Pull CT over pipe shed with winch & stab into injector, M/U injector to stripper, set back Inj 13:00 - 13:15 0.25 RIGU P PRE Weld on CTC, Pull test CTC. 13:15 - 14:45 1.50 RIGU P PRE RU dart catcher sub, pump 8bbls thru surface lines to coil with Biozan KCL water, Press test inner reel valve and hardline to 4000psi, Fill CT wI biozan, install dart, eire, dart on seat at 39.4 bbls. RD catcher sub, RU, PIT weld-on CTC, Open well. Well was dead. 14:45 - 15:15 0.50 STWHIP P WEXIT PJSM on PU and handling BHA and Pre- Spud Mtg 15:15 - 15:30 0.25 STWHIP P WEXIT M/U BHA #1,2.74" Pilot hole mill wI string mill, WFD 2 3/8" PDM, 2 Jts of 21/16" CSH tbg, WFD MHA. OAL = 76.74' 15:30 - 18:15 2.7.5 STWHIP P WEXIT RIH with Milling Assy #1, dry tagged 9485', set dn w/1 K, S/O Wt 18 K, PU Wt 31 K, PU to 9475', circ w/ 1.5 bpm, 1000 psi, RIH to pinch point at 9483.9', mtr stalled, S/O Wt 19.9 K, Up Wt 28 K, second tag at 9483', mtr stalled. 18:15 - 18:30 0.25 STWHIP P WEXIT PUH 15', circ & establish free spin @ 1.55bpm/1020psi. RBIH & ease in till motor work @ 9482.8'. Correct CTD to 9470'. Flag pipe & start milling window with 2ppb bio-KCL fluid. 18:30 - 21:30 3.00 STWHIP P WEXIT Stall4x @ 9470.1'. Ease in & mill from 9470' to 9471' with 1.55/1.55bpm, 1020/1250psi & 2-3k WOB. 21:30 - 23:00 1.50 STWHIP P WEXIT Mill to 9472' with 1.55/1.55bpm, 1 020/1300psi & 4k WOB. 23:00 - 00:00 1.00 STWHIP P WEXIT Mill to 9472.4' with 1.55/1.55bpm, 1020/1500psi & 5k WOB. 6/6/2006 00:00 - 01 :00 1.00 STWHIP P WEXIT Continue milling to 9473' with 1.55/1.55bpm, 1 020/1500psi & 5k WOB. 01 :00 - 02:00 1.00 STWHIP P WEXfT Mill to 9474' with 1.55/1.55bpm, 1150/1450psi & 5k WOB. 02:00 - 04:00 2.00 STWHIP P WEXIT Mill to 9475' with 1.55/1.55bpm, 1250/1550psi & 6k WOB. 04:00 - 05:45 1.75 STWHIP P WEXIT Mill to 9476' with 1.55/1.55bpm, 1300/1600psi & 5k WOB. 05:45 - 07:45 2.00 STWHIP P WEXIT Paint EOP flag @ 9000' & POOH window milling BHA #1. Printed: 612012006 12: 16:55 PM BP EXPLORATION Operations Summary Report Page 2 _ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 6/1/2006 Rig Release: 6/17/2006 Rig Number: N1 Spud Date: 3/27/1981 End: 6/17/2006 Date From - To Hours Task Code NPT Phase Description of Operations 6/6/2006 07:45 - 08:00 0.25 STWHIP P WEXIT POH LD 2.74" Pilot Milling Assy # 1. DWM gauage 2.74" go I 2.73" no-go & DSM gauge 2.74" no-go. 08:00 - 09: 15 1.25 STWHIP P WEXIT PU 2.74" Milling Assy #2 wI WFD 2.74" mill, 2.5 deg mtr, Dir-Gr-Orientor, MHA, weld-on CTC 09:15 - 11 :45 2.50 STWHIP P WEXIT RIH wI Milling Assy #2, shallow hole test MWD/orientor at 3310', slight bobble thru GLM at 3920', set dn on GLM at 4056', cycled orientor, TF at 45L, RIH to 4077' wI .22 bpm, tagged up, worked past 4077' wI .22 bpm, RIH, correct depth -15' at EOP, RIH tagged dry at 9473', Up Wt 29.5K, Dn Wt 17.7K, PU, TF @ 14 L, pump rate 1.43bpm, 1824 psi, s/o TF rolled to 2 L, mtr work at 9472.8' 11 :45 - 12:00 0.25 STWHIP P WEXIT Milling thru 3 1/2" window fl 9472.8 to 9474.3 wI 1.51 bpm at 2100, FS 1820 psi, PVT 169 bbls 12:00 - 12:45 0.75 STWHIP P WEXIT Mill to 9476' with 25L TF, 1.55/1.55bpm, 2000/2150psi & 8k WOB. 12:45 - 13:45 1.00 STWHIP P WEXIT Mill to 9477' with 15L TF, 1.55/1.55bpm, 2000/2150psi & 7k WOB. 13:45 - 14:30 0.75 STWHIP P WEXIT Control mill to 9478' with 8L TF, 1.55/1.55bpm, 2000/2150psi & 6k WOB. 14:30 - 15:15 0.75 STWHIP P WEXIT Control mill to 9480' with 8L TF, 1.55/1.55bpm, 2000/2150psi & 6k WOB. Exit into formation @ 9480'. 15:15 -16:45 1.50 STWHIP P WEXIT Control mill formation to 9486' with 1.55/1.55bpm, 2000/2150psi, 6k WOB & 6fph ave ROP. Meanwhile swap the wellbore to 60% new/40% reconditioned 8.5ppg Flo-Pro mud with 3% L-T & 8ppb K-G. 16:45 - 17:45 1.00 DRILL P WEXIT Short wiper to 9450'. Window looks clean. RBIH & establish freespin @ 1.55bpm/3200psi. Geo confirms formation in BU samples. 17:45-18:10 0.42 DRILL P WEXIT Control mill to 9490' with 2L TF, 1.55/1.55bpm, 3200/3500psi, 7k WOB & 8fph ave ROP 18:10-19:00 0.83 DRILL P WEXIT Backream/dress window/rat hole 3x & drift 2x. Tentative window depths are: TOWSfTOW = 9470', BOW = 9480', RA PIP Tag = 9476'. Reamed 3 times and dry tagged at 9,488 ft twice. 19:00 - 20:45 1.75 DRILL P WEXIT POOH and conducted shallow hole test on orientor at 3,500 ft (OK) 20:45 - 22:20 1.58 DRILL P PROD1 Handle BHA, Mill at 2.74" No/Go. LD window exit BHA and PU 1.1 deg BHI motor and HYC 2.70· x 3" BC bit. Offset at 14deg in I 69 deg out 22:20 - 00:00 1.67 DRILL P PROD1 Set counters and RIH. SHT at 3,500 ft (OK) 6nt2006 00:00 - 01 :00 1.00 DRILL P PROD1 RIH and corrected + 17 ft to the window flag. Tied in from 9,270 ft to 9,340 ft (Upper Zone IV) Added 6 ft correction 01 :00 - 01 :20 0.33 DRILL P PROD1 Orient TF to HS above WS With 1 deg LOHS, RIH and dry tagged bottom at 9,490 ft. Up wt 25k and 18k down 01 :20 - 01 :45 0.42 DRILL P PROD1 Orient TF to 30 to 45 R HS Op = 1 .56 bpm at 3,430 psi off bottom Vp = 322 bbls 1 :45 - 02:00 0.25 DRILL P Drilling build section in III at 1 - Op 1.53 11.56 at 3 to 3.0 k to keep TF at 45R 02:00 . 02:20 0.33 DRILL fie 40L on bottom Printed: 6120/2006 12:16:55 PM Re: Sundry revision for 0-1 OB 306-029 e 'UZ- ....! '1 e Subject: Re: Sundry revision for G-108 306-029 From: Winton Aubert <winton_aubert@admin.state.ak.us> Date: Tue, 200615:49:39 -0800 Sean, Per 20 MC 25.112 (i), AOGCC hereby approves alternate well plug placement in well P8U G-108 (PTD 202-117), with sundry procedure changes as described below. All other sundry approval stipulations apply. Winton Aubert AOGCC 793-1231 McLaughlin, Sean M wrote: Winton, When the sundry was submitted for G-10B it was thought that no cement was present is the 3-1/2" x 7" IA at 9470'. In order to mill a window cement was planned to be squeezed into the annular space and into the G-10B liner. The scope of work was as follows: Pre-IDe: Work I) Tubing has been inspected with a PDS caliper and is in good condition. 2) Integrity testing of the entire well is yet to be performed. 3) The 3 W' tubing will be punched in two places, 9493-97 and 9250-54. 4) A cast iron bridge plug will be set at 9485'. 5) A mechanical whipstock will be set at 9470'. 6) A minimum of 20 bbls of cement will be down squeezed through the punched 3 W' straddle to cement both the straddle annulus and the G-l OB liner. 7) Remove flow line, remove well house, and level pad. A Cement bond log was run and we determined there was good quality cement in the 3-1/2" x 7" IA at 9470'. Unfortunately the CIBP was set on the next run and it is not possible to squeeze cement as planned. I propose the following as revised pre rig work: Revised Pre-Rig Work Summary: I. S Set DGL V in station #2. Done 2. S Run dummy whipstock drift to 9500 ft (top of2 3/8" liner). Done 3. S Tubing has been inspected with a PDS caliper and is in good condition. Done 4. 0 MIT-IA and MIT-OA Done 5. E Cement bond log 9100' to 9500' Done 6. E A cast iron bridge plug will be set at 9485'. Done 7. E A Weatherford 3-1/2" LSXwillbe set at 9470'. 8. 0 Remove flow line, remove well house, and level pad. The top perforation in G-10 is at 9924' MD. BP has set a CIBP at 9485' and a whipstock at 9470'. The sidetrack will exit G-10B into the Ivishak (Zone 4). The primary cement job on G-10C will be brought to the top of the liner at 9425'. BP requests a waiver to 20 MC 25.112(E) which states the following: (E) if the perforations are isolated from open hole below, a mechanical bridge plug set no more than 50 feet above the top of the perforated interval, and either a minimum of 75 feet of cement placed on top of the plug by the displacement method or a minimum of 25 feet of cement placed on top of the plug with a dump bailer. lof2 5/2/2006 3 :49 PM e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _ Inserts\MÏcrofilm _ Marker.doc ) ) FRANK H. MURKOWSKI. GOVERNOR ALASIiA OIL AND GAS CONSERVATION CO.MltDSSION 333 W. 7TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Ted Stagg CT Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay, G-10B Sundry Number: 306-029 dJJ~-!l7 SCANNED JAN 2, 5 2.1)00 Dear Mr. Stagg: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, ¡/Jrr/ ~ M// .. -1-/ " I \ "7t.L- DATED thi~ day of January, 2006 Daniel T. Seamount Jr. Commissioner Encl. ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 2 3 tOOh APPLICATION FOR SUNDRY APPROV'lna Oil & Gas Cons. Commission 20 AAC 25.280 Anchorage Wf:tk- "z..+(z.oo~ RECEIVED 1. Type of Request: a Abandon/' 0 Suspend 0 Operation Shutdown 0 Perforate 0 Other o Alter Casing 0 Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well o Change Approved Program 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: / III Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number 202-117 /" 6. API Number: 50- 029-20553-02-00 /' 99519-6612 70.341 9. Well Name and Number: PBU G-10B ./ ADL 028280 10. Field / Pool(s): Prudhoe Bay Field / Prudhoe Bay Pool PRESENT WELL.CONOITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): 11204 9022 None MD / TVD Burst 8. Property Designation: 11. Total Depth MD (ft): 11241 Casing Structural Conductor Surface Intermediate Production Liner Total Depth TVD (ft): 9021 Length Size Junk (measured): None Collapse Liner 110' 20" x 30" 110' 1101 26861 13-3/8" 2686' 26861 4930 2670 96201 9-5/8" 96201 87761 6870 4760 54711 7" 41491 - 96201 40791 - 87761 8160 7020 17431 2-3/8" 94981 - 112411 86981 - 90211 11200 11780 Perforation Depth MD (ft): Perforation Depth TVD (ft): 9924' - 111001 / 8989' - 90231 Packers and SSSV Type: 9-5/8" x 3-1/2" Baker 'SABL-31 packer Tubing Size: 3-1/2", 9.3# Tubing Grade: Tubing MD (ft): L-80 96201 Packers and SSSV MD (ft): 40721 /' 12. Attachments: 181 Description Summary of Proposal o Detailed Operations Program 14. Estimated Date for Commencing Operations: o BOP Sketch 13. Well Class after proposed work: o Exploratory III Development 0 Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Ted Stagg Title CT Drilling Engineer Signature J.l~ January 27, 2006 Date: 15. Well Status after proposed work: o Oil o Gas o WAG DGINJ / o Plugged III Abandoned o WINJ 0 WDSPL Contact Ted Stagg, 564-4694 Phone 564-4694 Commission Use Only Date yfz y:, ,: Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: <....1fi 0 - () d q o Plug Integrity o BOP Test o Mechanical Integrity Test o Location Clearance Other: Ai f /191./ eJ ¡::"v WL I c::> - 4 0 ( r ~.M.. ~ d -Co". ç,...: ck ~ !M2-l (¡ - '0 C · RBDMS 8Ft .IAN 2 4 2006 Subsequent Form Required: t 0 - 4- 07 . ~-- Approved By: Form 10-403 Revised 07/2005 COMMISSIONER APPROVED BY THE COMMISSION \ . Date d--L\- ólt2 Submit In D ~plicate ORIGINAL ) ) 033 To: Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Ted Stagg CTD Engineer Date: January 19, 2006 Re: Prep Prudhoe G-I0B for CTD sidetrack Sundry approval is requested to prepare G-I0B for a sidetrack. G-I0B is a Zone IB sidetrack drilled in 2002. Initial rates were low and continued to decline despite several add perf jobs. Over the past 12 months G-10B has /' been produced only 5% of the time due to high GOR. With no further well work options available, a sidetrack to a new area is planned. /" The sidetrack, G-I0C, is scheduled to be drilled by Nordic 1 on or about Feb. 12.2006. The plan calls for cement squeezing both the G-10B liner and the 3 Y2" x 7" straddle annulus to prepare for a two-string window in Zone 2. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. ~ . Pre-Rh!: Work 1) Tubing has been inspected with a PDS calliper and is in good condition. 2) Integrity testing of the entire well is yet to be per:~~' --/J 3) The 3 ~"tubing will be punched in two places, 9:t1?'':J7 and 9t~. 4) A cast iron bridge plug will be set at 9485'. - -- 5) A mechanica:æw ipstock will be set at 9470' . 6) A minimum 20 961s of cement will be down squeezed through the punched 3 Y2" straddle to cement both the strae1lnnulus and the G-10B liner. 7) Remove flow line, remove well house, and level pad. The pre CTD work is slated to begin about Jan. 27. 2006. , . \~~ \ 0 - 4-0 ~ CA.f r YO tJ c....{ · Rie: Work 1) MIRV Nordic 1 and test BOPE. 2) Mill 2.74" window in Zone 2 through the 3 ~" x 7" straddle. 3) Drill sidetrack into Zone 1 B target. 4) Run solid 2 3/8" liner and cement. 5) Cleanout liner and perforate for production (-800 ft of perfs). 6) Freeze protect well and RDMO. Post- Rie: Work 1) Install well house, flow line and gas lift valves. ~~- CTD Drilling Engineer 564-4694 CC: Well File Sondra Stewmanfferrie Hubble ) TREE = 3-1/8" FMC W 14" QU WELLHEAD = McEVOY ACTUATOR = AXELSON "kB.I~[èT;'- "-'^--'""-~^--~"^7Õ'j' Bï=:..E[E\,r;·····^····^..···.._..·__.._m^'^'"_m32~27ï ~,.'^....~~"......"',.,,~..,,,.. ."'''".'''.,.w,..,,·,.''.,''......n..''n'''~'........,.,,.,................''.fi,...,.' KOP = 3205' ",.............,.~,....,......~,."..........,,,..,,;"''',.,.,....,,..,,.,,'.''''.,...,.,........,~.....,""'.................,,.,.....~...., Max Angle = 98 @ 11091' DatumMD= 9745' Datu m TV D = .......... ... ........ .... ... è8'öÓïs§ 13-3/8" CSG, 72#, N-80, ID = 12.347" H 2686' 1 TOP OF 7" SCAB LNR H 4149' Minimum ID = 1.995" @ 9507 2-3/4 II X 2-3/8 II XO 17" SCAB LNR, 29#, L-80, .371 bpf, ID = 6.814" H \ TOPOF7" LNR H 8064' 8064' 9-5/8" CSG, 47#, L-80, 10 = 8.681" H 8250' 1 TOP OF WHIPSTOCK H 9620' \ CIBP (06/10102) H 9680' 7" LNR, 29#, L-80, .0371 bpf, ID= 6.184" H 10235' 14-1/2" LNR, 15#, 13-8CR, .0188 bpf, 10 =4.283" H 11170' PERFORATION SUMI\AA. RY RB= LOG: SÆRRY SUN MWD 1 SWS fvCNL/GR ANGLEA TTOP ÆRF: 59 @ 9924' I\bte: Refer to A"oductbn œ for historical perf data SIZE SPF INTERVAL OPN/SQZ DATE 1-9/16" 4 9924 - 9939 0 08/23/03 1-9/16" 6 9980-10030 0 01/14/03 1-9/16" 4 10185 - 10420 0 06/29/02 1-9/16" 4 10450 - 10530 0 06/29/02 1-9/16" 6 10630-10705 0 01/14/03 1-9/16" 4 10795 - 10945 0 06/29/02 1-9/16" 4 10990 - 11015 0 06/29/02 1-9/16" 4 11050 - 11100 0 06/29/02 ') G-10B SAFETY NOTES: CHROME LINER - 1 =>---I 2201' 1-1 3-1/2" HESXBOSSSV LAND NIP, 10= 2.75" 2604' \-1 9-5/8" r:N A<R \ ~ GA S LIFT I\AA. N ORB.. S ~ ST MD TVO ŒV lYÆ VLV LATCH PORT DATE 2 3918 3878 28 FMHO D\I1Y RK 06/07/02 1 4039 3984 30 FMHO D\I1Y RK 06/07/02 / 4072' 1- 9-5/8" X 3-1/2" BKR SABL-3 PKR W/KBH-22 ANCHOR SEAL ASSY, 10= 3.93" 4157' \-1 9-5/8" X 7" BAKER LNR PKR, 10 = 6.187" \ :8: L z ~ {@ """ ~ ~ ~W 8072' \-1 9-5/8" X 7" BAKER LNR PKR, 10 = 6.187" 1 9501' \-1 3" BKROEA..OYMEI\ITSLV, 10=2.250" 9507' 1-1 2-3/4" X 2-3/8" XO, ID = 1.995" \ \-1 B..MD TT NOT LOGGED ~ ~ \2-3/8" LNR, 4.7#, L-80, .0039 bpf, D = 1.995" H 11241' I DA.1E REV BY CO'vUv'ENTS 09/22103 CMJ/lLP DA TL1v1 tvD & PERF ANGLE 02/04104 CMJ/lLP PERF ANGLE CORREC1l0N 04/02105 OAV /lLH LNR TOP PKR PULLs) PRUDHOE BAY UNIT WELL: G-10B PERMIT NJ: '2021170 API NJ: 50-029-20553-02 SEC 12, T11 N, R13E, 2554' SNL & 2368' WEL DATE . 04/81 06/25/95 06/30/02 01/14/03 07/13/03 08/23/03 REV BY COMvlENTS ORIGINAL COMPLETION SIDEfRACK(G-10A) JLM/KK CTD SIDETRACK (G-10B) KEY /tlh ADD PERFS CMO/TLP KB B..EVA 1l0N CORREC1l0N BJM'KK ADD PERFS BP Exploration (Alaska) 3-1/8" FMC W/4" au ::: McEVOY N--80, 10::: 12.347" SCABLNR x 17" SCAB LNR "371 opf, 10::: 6.814" 1"LNR L-80, ID 8.1381" PERFORA TION SUMMARY REF LOG: SPERRY SUN MWD I SWS MCNUGR ANGLE AT TOP PERF: 59@9924' Note: Refer to Production DB for historical perf data SIZE 8PF INTERVA.L DATE 1-9/16" 4 9924 - 9939 1-9/18" 6 99S0 - 10030 1-9/16" 4 10185 - 10420 1-9/16" 4 10450-10530 1-9/16" 6 10630 10705 1-9/16" 4 10795 - 1-9/16" 4 10990 - 11015 1-9/16" 4 11050 - 11100 I Thg punch I Baker 8-3 Packer, 10::: 3.93" 3-1/2" tb9, 9.2#, L-80, 10'" 2"99" ¡ TOP OF 4.5" LNR ¡ 7" LNR, 29#, .371 bpf, 10'" 6.814" I 4-1/2" LNR, .0188 bpf, 10 4"283" OATE 04/81 05125/95 06/30/02 01114/03 07113/03 REV BY JI..M/KK cm (G-10B) KEY/tin AOO PERFS KS ELEVATION CORRECTION BJMlKK AOO PERFS ---- ..... ..... 1 ¡ 8064' 11170' ¡. DA TEE REV BY 04/02/05 DAV ITLH LNR TOP PKR PULLED ES: CHROME LINER 2201' 3-112" HES XBD SSSV LAND NIP, 10::: 2.75" 9-518" DV PKR GAS œv 2S 30 LATCH PORT RK oe/07/02 RK 05/07/02 J. i ID::: Xl" 9-5/S" X 7" LNR PKR, ID'" 5.187" I 9·5/8" SIDETRACK WINDOW 8250' - 8300' I 2-318" LNR, 4.7#, L-SO, .0039 ID= 1.995" PRUDHOE SA Y UNIT WELL: G-10B PERMIT No: 170 API No: 50-029-20553-02 see 12, T11 N, R13E, 2554' 8NL & 2368' WEL BP Exph:m:!tion (Alaska) I PRUDHOE BAY, PRUDHOE OIL PBU_G PRUDHOE BAY G-10B 100 50 Oil Rata (CD) ( Mbblfd ) Water Rate (CD) (Mbbl{d } iÀs Rate (CD) ( MMcffd ) CUm Oil Prod ( MMbbl ) Gas! Oil Ratio 10 5 0.5 0.1 2002 03 Date 04 '" 05 RE ALASKA OIL AND GAS CONSERVATION COMMISSION JUN 2 1. 2005 REPORT OF SUNDRY WELL OPERAT1Q~~§8[ ') ') STATE OF ALASKA 1. Operations Performed: Abandon D Alter CasingD Change Approved Program D PluQ Perforations 0 Perforate New Pool D Perforate [X] Stimulate D WaiverD Repair Well 0 Pull TubingD Operation Shutdown 0 2. Operator Name: 3. Address: 4. Current Well Class: Development []] ExploratoryD BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (fl): StratigraphicD ServiceD 9. Well Name and Number: G-10B 10. Field/Pool(s): Prudhoe Bay Field 1 Prudhoe Oil Pool 70.34 8. Property Designation: ADL-028280 11. Present Well Condition Summary: Total Depth measured 11241 feet true vertical 9021.4 feet Plugs (measured) Effective Depth measured 11204 feet Junk (measured) true vertical 9021.7 feet SCANNED JUl... a 7 2005 Casing Length Size MD TVD CONDUCTOR 110 20 Inch 94 Lb H-40 38 148 38.0 148.0 SURFACE 2649 13-3/8" 72# N-80 37 - 2686 70.3 70.3 PRODUCTION 8214 9-518" 47# L-80 36 - 8250 70.3 70.3 LINER 3915 7" 29# L-80 4149 - 8064 4079.2 - 7369.1 LINER 1556 7" 29# L-80 8064 - 9620 7369.1 - 8776.1 SLEEVE 6 3" Baker DEPLOY SLV 9501 - 9507 8700.0 - 8703.5 LINER 1734 2-3/8" 4.7# L-80 9507 - 11241 8703.5 - 9021.4 Perforation depth: E·..." ,~..._ j.(âì!dwöt~~rD Time Extension D Re-enter Suspended WellD 5. Permit to Drill Number: 202-1170 6. API Number 50-029-20553-02-00 None None Burst Collapse 1530 520 4930 2670 6870 4760 8160 7020 8160 7020 11200 11780 Measured depth: 9915-9940,9980-10030,10185-10420, 10450-10530, 10630-10705, 10795-10945, 10990-11015, 11050-11100 True vertical depth: 8984-8997,9014-9030,9037-9026,9025-9017, 9011-9013, 9021-9030, 9031-9031, 9029-9023 TubinQ ( size, ç¡rade, and measured depth): 3-112" 9.3# L-80 @ 34 9620 Packers & SSSV (type & measured depth): 3-1/2" Baker SABL-3 Packer 7" Baker Liner Packer 7" Baker Liner Packer @ 4072 @ 4157 @ 8072 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: RBDMS 8FL JUN 2 2 2005 Prior to well operation: Subsequent to operation: Oil-Bbl SHUT-IN 444 Representative Dailv Averaqe Production or Iniection Data Gas-Met Water-Bbl Casing Pressure Tubing Pressure 13 20584 6 14. Attachments: 15. Well Class after proposed work: ExploratoryD 16. Well Status after proposed work: OilŒ] GasD Copies of Logs and Surveys run _ Daily Report of Well Operations _ ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact DeWayne Schnorr Printed Name De~aJne Schnorr ,() 0 . Signature ~?/.at¡_...., ~ A7~ Title Petroleum Engineer Phone 564-5174 Form 10-404 Revised 4/2004 o 1073 Development ŒJ Service D WAG D GINJD WINJD WDSPLD Prepared by DeWayne R. Schnorr (907) 564-5174 Sundry Number or NIA if C.O. Exempt: NIA Date 6/21/05 ) ) G-10B DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 04/30105 ***WELL SII ON ARRIVAL*** (ADPERFS). DRIFT WI 1 11/16" DUMMY GUN TO 10,042' SLM AND STOPPED DUE DEV (TARGET DEPTH =9940). HAD TO WORK TOOLS THROUGH SEVERE DOGLEG @ 96001.. ***NOTIFY PAD OP OF WELL STATUS, LEFT S/I. *** 05/09/05 PERFORATED BOTTOM 141 (9926'-994014 SPF) OF 251 INTERVAL.... CONTINUE TOMORROW. 05/10105 T/I/O=2350/54010 ASSIST E-LlNE. PUMPED 95 BBLS OF CRUDE TO ASSIST E-LlNE. FINAL WHP'S= 50/54010 05/10105 PERFORATED TOP 111 (9915'-9926' 6 SPF) OF 25' INTERVAL...***JOB COMPLETED*** FLUIDS PUMPED BBLS 95 CRUDE 95 TOTAL Page 1 ) TREE = 3-118" FMCW/4" QU WB..LI-EAD = McEVOY 'Ä crÜÄTOFf;;······,,",,·,,"",,· """ÄXELSÕN' KB. 'ELEV"'';"'" . . . f6 j' 'SF: "ËC§l·;;,····..·w.w...."..ww.w."..wm·..··32·.·27" , .....·....w,""...,·,....,,·,~, ..... ........,................,...,,,. KOP = 3205' "."",,, .m""'"""'""""'''..m.......'''' ............"'''...........~ Max Angle = 98 @ 11091' Datum MD = 9745' "ÕaiÙiTITVO; .....m.. ........ ·····8"80o;8S" 13-3/8" CSG, 72#, N-80, ID = 12.347" H 2686' ~ 1 TOP OF 7" SCAB LNR H 4149' Minimum ID = 1.995" @ 9507 2-3/4" X 2-3/8" XO 17" SCAB LNR, 29#, L-80, .371 bpf, ID = 6.814" H 1 TOPOF7" LNR H 8064' 8064' 9-5/8" CSG, 47#, L-80, ID = 8.681" H 1 TOP OF WHIPSTOCK H 8250' 9620' 1 CIBP (06/10/02) H 9680' 7' LNR, 29#, L-80, .0371 bpf, ID = 6.184" H 10235' 14-1/2" LNR, 15#, 13-8CR, .0188 bpf, ID =4.283" H 11170' PERFORATION SUMI\J1t\ RY RB= LOG: SÆRRY SUN MWD / SWS MCNLlGR ANGLE A TTOP ÆRF: 59 @ 9924' N:Jte: Refer to R"oductbn œ for historical perf data SIZE SPF INTERVAL OPN/SQZ DATE 1-9/16" 4 9924 - 9939 0 08/23/03 1-9/16" 6 9980-10030 0 01/14/03 1-9/16" 4 10185 - 10420 0 06/29/02 1-9/16" 4 10450 - 10530 0 06/29/02 1-9/16" 6 10630- 10705 0 01/14/03 1-9/16" 4 10795 - 10945 0 06/29/02 1-9/16" 4 10990 - 11015 0 06/29/02 1-9/16" 4 11050 - 11100 0 06/29/02 ~ " t; 9915-r¡9~' 0 OS/10105 /./I/I¡t ¿¡ ",~".. ''If 0 () 05/01//0..5 DATE 04/81 06/25195 06/30/02 01/14/03 07/13103 08/23103 REV BY COMMENTS ORIGINAL COMPLETION SlDErRACK (G-1 OA) JLM/KK CTDSIŒTRACK (G-10B) KEY/tlh ADD PERFS CMO/TLP KB B..EV A 1l0N CORREC1l0N BJM'KK ADD PERFS ') G-108 SAFETY NOTES: CHROME UNER " 1 =>---f 2201' 1-1 3-1/2" HESXBDSSSV LAND NIP, ID= 2.75" 2604' 1-1 9-5/8" rN A<R I :8: L :g: GA S LIFT I\J1t\ N DRB..S ~ ST MD TVD DEV 1YÆ VLV LATa; PORT DATE 2 3918 3878 28 FMHO DMY RK 06/07/02 1 4039 3984 30 FMHO DMY RK 06/07/02 4072' 1- 9-5/8" X 3-1/2" BKR SABL-3 PKR W/KBH-22 ANa;OR SEAL ASSY, ID = 3.93" 4157' 1-1 9-5/8"X7"BAKERLNRPKR,ID=6.187" 1 ~ ~ 8072' 1-1 9-5/8" X 7" BAKER LNR PKR, ID = 6.187" I 9501' 1-1 3" BKRDEA...OYMENTSLV, ID=2.250" 9507' 1-1 2-3/4" X 2-318" XO, ID = 1.995" 1 1-1 B..MDTT NOT LOGGED ~ ~ 12-318" LNR, 4.7#, L-80, .0039 bpf, D = 1.995" H 11241' I DA TE REV BY COMMENTS 09/22103 Ctv'O/lLP DATUVI MD & PERF ANGLE 02/04104 Ctv'O/lLP PERF ANGLE CORREC1l0N 04/02105 DAV /lLH LNR TOP PKR PLlLBJ PRUDI-DEBAY LNIT WELL: G-10B PERMT N:J: ~021170 API N:J: 50-029-20553-02 SEC 12, T11N, R13E, 2554' SNL & 2368' WEL BP Exploration (Alaska) 1 ~ JJ\.¡) ~ '\ DATA SUBMITTAL COMPLIANCE REPORT 7/6/2004 )r úJ. v(, / ~W>L )J0'~ API No. 50-029-20553-02-00 Well Name/No. PRUDHOE 8A Y UNIT G-108 Permit to Drill 2021170 MO 11241 ~ ------ - .------- - --~- ---------- Operator 8P EXPLORATION (ALASKA) INC .--- Current Status 1-01L TVO 9021 ./ Completion Date 6/30/2002 UIC N Completion Status 1-01L REQUIRED INFORMATION Mud Log No Samples No .. (r:~=~) Olrectlonal Surve~ Yes . ~. - - ----- "- - -------"- -- DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: (data taken from Logs Portion of Master Well Data Maint) Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ~ ~- - ~-------- ~ona[survey ~pt Directional SurVey Q...EfY Cø ~4 LIS Verification ~/c v11238 Neutron , fr,5Í Directional Survey .-.EÐ 0 ~nalsurvey ~ ~g :'~C i ~/ ¡~- I il1pt I ~O W. CAse ! ~ --~ _P~f-- Log Log Run Interval OH/ .---- Scale Media No Start Stop CH Received Comments 1 9620 11241 Open 7/24/2002 9620 11241 Open 7/24/2002 9603 10914 Case 2/26/2003 9255 11200 Case 10/25/2002 9618 1 0400 Open 8/14/2002 9618 10400 Open 8/14/2002 25 Blu 9234 11202 Case 1 0/25/2002 C IV C/ (Vu vv... fs¡ (1..( 25 Blu 1 j-Uv W944 11241 Open 5/14/2003 10944 11241 Open 5/14/2003 25 Blu 1 }I'{l) ~ 11241 Open 5/14/2003 9603 10914 # Case 2/26/2003 10944 11241 Open 5/14/2003 9739 1 0691 Case 1/27/2003 -- 9607 1 0943 25 9620 1 0944 Open ROP, NGP Sample Interval Set Start Stop Sent Received Number Comments Neutron Lf5âinma Ray [)'1717 LIS Verification ,Gamma. Ray LIS Verification LIS Verification ~7 LlSVerificátion (/1177 4 LIS Verification <-1'1774 Rate of Penetration Well Cores/Samples Information: -- ----- Name Permit to Drill 2021170 MO 11241 TVD 9021 Well Cored? ADDITIONAL INFORMATION y~ Chips Received? -v+-N-- Analysis Received? Comments: -----._~- ------ -"- --- ----- --Yl-N---- - ---~------- Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 7/6/2004 Well Name/No. PRUDHOE BAY UNIT G-10B Operator BP EXPLORATION (ALASKA) INC Completion Date 6/30/2002 Completion Status 1-01L Current Status 1-01L Daily History Received? à (Ý)/N r(9N Formation Tops Date: API No. 50-029-20553-02-00 UIC N ~ .~ ') STATE OF ALASKA - \ ALASKA OIL AND GAS CONSERVATION CO,v,IV1ISSION REPORT OF SUNDRY WELL OPERATIONS ¡j. 1. Operations Performed: Abanon 0 After Casino 0 Change Approved Program 0 SuspendD Operation ShutdownD Perforate. Variance 0 Repair Well 0 Pluo PerforationsD StimulateD Time ExtensionO Pull TubingO Perforate New PoolD Re-enter Suspended Well 0 Annuar Disposal 0 OtherO ADD PERFS 2. Operator Name: BP Exploration (Alaska), Inc. 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 70.34 8. Property Designation: ADL 028280 11. Present Well Condition Summary: 4. Current Well Class: Development. ExploratoryO 5. Permit to Drill Number: 202-117 6. API Number 50-029-20553-02-00 Stratigraphic D Service 0 9. Well Name and Number: G-10B 10. Field/Pool(s): Prudhoe Bay Field I Prudhoe Bay Oil Pool Total Depth measured 11241 feet true vertical 9021 feet Plugs (measured) Effective Depth measured 11204 feet Junk (measured) true vertical 9022 feet Casing Length Size MO TVO Burst Collapse Conductor 110' 2011 148' 148' 40K 520 Surface 2648' 13-3/811 26861 2686' 80K 2670 Intermediate 9582' 9-5/811 9620' 8776' 80K 4760 Scab Liner 711 41491-8064' 4079'-7369' 80K 6280 Liner 5471' 711 80641-96201 7369'-8776' 80K 6280 Sidetrack Liner 17431 2-3/811 9498'-11241' 8698'-9021' 80K 11780 Perforation depth: Measured depth: Open Perfs 99241-99391, 99801-100301,101851-104201,104501-105301, Open Perfs 106301-107051, 107951-109451, 109901-11015', 110501-111001 True vertical depth: Open Perfs 8989'-89961,90141-90301,9037'-9026',90251-9017', Open Perfs 9011'-9013',9021'-90301,90311-9031',9029'-90231 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: ~~ :-t- :\: :, Representative Daily Average Production or Injection D,~ta , ,c. . Gas-Mcf Water-Bbl CasiAQ,Pres-sure " . -Tubing.P.ressure.".:. Daily Report of Well Operations_X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact DeWayne R. Schnorr Printed Name DeWayne R. Schnorr ,) /J - Signature A;.t'~~- ~~ Phone 907/564-5174 Oate ORiGiNAL t.-8fL Tubing: ( size, grade, and measured depth) Packers & SSSV (type & measured depth) 13 Oil-Bbl Prior to well operation: Subsequent to operation: 14. Attachments: SHUT -IN 698 Copies of Logs and Surveys run - Form 1 0-404 Revised 2/2003 3-1/211 9.3# L-80 TBG @ 9620'. 9-5/8Ix3-1/2" BKR PKR @ 4072'. 9-5/8"x7" BKR LNR PRK1s @ 4157' & 80721. 3-1/2" Eclipse LNR Top PKR @ 9498'. 3-1/2" HES XBD SSSV Nip @ 22011. ~ "."', -''''' .~..... ". -"'~." j ..':- . . ;~ "'.t..:.. ' .... , ' ...' . ~ ~ : . :....,~ ,- -, .. .'.- "...., (4"" 20758 14 15. Well Class after proposed work: ExploratoryD Development. 16. Well Status after proposed work: Oil. GasO WAGO GINJO 797 Service D WINJO WDSPLO Sundry Number or N/A if C.O. Exempt: N/A Title Techical Assistant ~..~ ";' ') ") G-108 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 05/18/2003 05/19/2003 OS/20/2003 08/21/2003 08/23/2003 09/12/2003 ANN-COMM (AC-EVAL AND REPAIR): AC-BLEED ANN-COMM (AC-EVAL AND REPAIR): AC-MONITOR ANN-COMM (AC-EVAL AND REPAIR): AC-MONITOR PERFORATING: DRIFT/TAG PERFORATING: PERFORATING TESTEVENT --- BOPD: 681, BWPD: 12, MCFPD: 20,983, AL RATE: 0 EVENT SUMMARY 05/18/03 T/I/O = 760/700/1060. BLEED OA AND MONITOR BUR. OA FL @ SURFACE. BLED OA FROM 1060 PSI TO 0 PSI IN 5 MINUTES. (0.5 BBL RETURNED). MONITORED FOR 30 MINUTES. OAP ROSE TO 60 PSI. FINAL WHp1s = 760/700/60. 05/19/03 T/I/O = 2200/640/VAC. MONITOR WHp1s POST-OA BLEED. SHUT-IN. OAP DROPPED 60 PSI OVERNIGHT. OS/20/03 T/I/O=SSV/640/VAC MONITOR WHp1s POST OA BLEED. NO CHANGE SINCE YESTERDAY. 08/21/03 (WELL SHUT IN ON ARRIVAL) DRIFT W/ 1.625 X 154" DUMMY GUN. STOP DUE TO DEV. @ 100521 SLM + 381 = 100901 CORR TO RKB. RDMO. (LEFT WELL SHUT IN ) ( PRE ADD PREF ) 08/23/03 PERF 99241-99391 WITH 1.56" 1606 POWERJET 4 SPF, 10.7" PENE, 0.19" EH, 3.4 GMS. CORRELATE TO SWS MCNL DATED 6-29-02 AT LINER TOP. ***PAD OPERATOR TO POP WELL AND TEST*** 09/17/03 TESTEVENT --- BOPD: 681, BWPD: 12, MCFPD: 20,983, AL RATE: 0 FLUIDS PUMPED BBLS 1 1 DIESEL FOR PIT OF SURFACE PRESSURE CONTROL EQUIPMENT TOTAL ADD PERFS 08/23/2003 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 1.56" PJ1606 POWERJET GUN, LOADED @ 4 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 99241 - 99391 Page 1 ) Jo À-,.. 1 --.., WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 i\nchorage, Alaska 99501 June 05, 2003 RE:MWDFormation Evaluation Logs: G-IOB, AK-MW-22098 G-IOB: Digital Log Images 50-029-20553-02 1 CD Rom PLEAS.E ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. i\nchorage, Alaska 99508 J .:1' "] Date: if;'! ./!J Signed: ~ . \ ~. , Transmittal Form INTEQ To: AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 Attention: Lisa Weepie Reference: G-I0B : Contains the following: i 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary '.1 ) '&1. BAKER HUGHES Anchorage GEOScience Center 1 blueline - GR/Directional Measured Depth Log 1 blueline - GR/Directional TVD Log LAC Job#: 319114 Sent By: Glen Horel Received ~" 6- QQo p------ Date: May 13, 2003 Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COpy FAX: (907) 267-6623 Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 RECEIVED MAY 14 2003 AI_a Qi & Gas Coos. Cornmileion Am::hCt1ge :;; 03 -//1 }J7J7 [[:-=;:;~':;;~,~:......I- i~"~ ,~;'~~';P;~t ,,~", ~~ !.... "', ... :;:r~ ;; '~~ :,n. :W~ , (.1~',' ,":) CtO" i=:....:::. IÜ, .;~ ."I.~ .,.......'"~., 1.1,.......,,... . . . i l=,. .~~ci~ : ,"..',1:11111,""",". :~~ N8JI iIrIo~ fll~ 11'111[,' [-~~.~~!~~~~'~~-=-~~-~~ :,,~~:i:~:~:~5:': ¡ _"1""~ ~ .~-- ""'''''''''' ..--.-.-.-.-'.. ;---~ . . :-"'1"000- "". --- - -. '----"-.-------.------ ---~----'- ) ) rXOJ-l/7 I / 5/~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation COl11ffi. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska February 25, 2003 RE: MWD Formation Evaluation Logs G-IOB, AK-MW-22098 1 LDWG formatted Disc with verification listing. ~I#: 50-029-20553-02 , PLEASE ACKNOWLEDGE RECEIPT BY SIGNJNG AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: Si~~~ J RECEIVED FEB 26 2003 A!a8ka 01 &; Gas Cons. Commi88ion Anchorage ,lrJs C!\J ... ) WELL LOG TRANSMITTAL ) ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7lhStreet Suite # 700 Anchorage. Alaska 99501 RE: Distribution - Final Print(sJ eX ti}~ / 17 I / to/ 7 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 WELL DATE LOG TYPE DIGITAL OR CD-ROM 1 MYLAR / SEPIA FILM 1 BLUE LINE PRINT(S] REPORT OR COLOR Open Hole 1 Res. Eva!. CH 1 1 1 G-1 DB 1-13&14- 03 Mech. CH 1 Caliper Survey Signed: ~(J- OQOfAJ Date: Print Name: RECEIVED JAN 2 7 2003 AJaeke on & Gas Cons. CommiMion Anch9'Jge PRoAcIiv( DiAGNOSTic SmviC[s, INC., } 10 K STREET SUiIE 200, ANChoRAGE, AK 99~0 I Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage@memorylog.com Website: ww\v.mcl11orylog.col11 Schlumberger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Well G-10B ~O~-}JÎ D.S. 7-13B,.;la~- J liD D.S. 11-24A Jc.¡,~-~Ot./ D.S.6-01 I í ~'O4 9 Job# 22332 MCNL 22333 MCNL 22381 RST 22378 RST 10/17/02 NO. 2488 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Log Description Color Date Blueline Sepia Prints CD 06/29/02 1 1 07/08/02 1 1 07/06/02 1 1 07/07/02 1 1 -~ ~. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage. Alaska 99508 Date Delivered: RECEIVED Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 :~~,v4~~Cb~ OCT 25 2002 A1~ ()¡~ & GðS Cooi. C~!J!IT1i::Mon AnchOflge ) ') STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well 181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4 Location of well at surface ----'~ ~'I"ØI. ~ .~It' . 2554' SNL, 2368' WEL, SEC. 12, T11 N, R13E,UM; COMPLET!ON I , ~I.!. ' bëA"".',( At top of productive interval "~ DAlE ',. \ ~,.:, :~: 3613' SNL, 4334' WEL, SEC. 12, T11N, R13E, uM' "'~3ó'I? "~s1J1t ", r , At total depth VERI FlED ' \""'~, .,,:'\ :, 3487' SNL, 345' WEL, SEC. 11, T11 N, R13E, UM " .!'Þ ", ,-k!:;~~:~..~::!.~~ 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 70.34' ADL 028280 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 6/21/2002 6/27/2002 6/30/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 11241 9021 FT 11204 9022 FT 181 Yes 0 No 22. Type Electric or Other Logs Run MWD, GR, ROP, Memory CNL, CCL ,23. CASING SIZE 20" x 30" 13-3/8" 9-518" 7" WT. PER FT. Insulated 72# 47# 29# 4.6# GRADE Conductor L-80 L-80 L-80 L-80 2-3/8" Classification of Service Well 7. Permit Number 202-117 8. API Number 50- 029-20553-02 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number G.10B 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 15. Water depth, if offshore 16. No. of Completions NIA MSL One 20. Depth where SSSV set 21. Thickness of Permafrost (Nipple) 2201' MD 1900' (Approx.) CASING, liNER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE CEMENTING RECORD Surface 110' 36" Cement to Surface Surface 2686' 17-1/2" 3500 sx AS 11,20 sx Top Job Surface 9620' 12-1/4" 1100 sx Class 'G', 140 sx AS I 4149' 9620' 8-1/2" 1011 sx Class 'G' 9498' 11241' 3" 72 sx Class 'G' 25. SIZE 3-1/2",9.3#, L-80 MD TVD AMOUNT PULLED TUSING RECORD DEPTH SET (MD) 9620' PACKER SET (MD) 4072' 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 1.56 Gun Diameter, 4 spf MD TVD 10185' - 10420' 9037' - 9026' 10450' - 10530' 9025' - 9017' 10795' -10945' 9021' - 9030' 10990' -11015' 9031' - 9031' 11050' - 11100' 9029' - 9024' ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 2000' Freeze Protected with MeOH 26. 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) July 8,2002 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BsL GAs-McF WATER-BsL CHOKE SIZE 7/2212002 4 TEST PERIOD 507 3753 16 74.61° Flow Tubing Casing Pressure CALCULATED OIL-BSL GAs-McF WATER-BSL OIL GRAVITY-API (CORR) Press. 24-HoUR RATE 25.9 ?8. CORE DATA IJ I- (~ t-1 ,,/ t [; Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit coreYJ¡i~. ~-- No core samples were taken. Form 10-407 Rev. 07-01-80 r~' i''''"\\ : ('~" ~, . ) f\ \ () '~ r\ L r'\ GAS-OIL RATIO 7396 JUL 2. Ó 2002 Alaska Oil & Gas Cons. \jOimi1lSSI0r~ Anchorage G~ RBDMS 8FL JUL 30 2002 Submit In Duplicate ') ) 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 2388 9650' 8798' 25N 9695' 8832' 21 TS I Zone 2A 9795' 8907' Zone 1 B 9905' 8978' RE(E~\fEft) d) r ")0112 JUL ~ ,J L \, Alaska Oi! & Gas Cons. GOmffilssmn Anchorage 31. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I ~erebY certify that the fOre,ing.. is true and correct to the best of my knowledge Signed TerrieHubble ~~. fÚ¡Mfð Title Technical Assistant G-10B 202-117 Well Number Permit No. I Approval No. Date 07..~.{)~ Prepared By Name/Number: Terrie Hubble, 564~4628 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITeM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 \\ \ ~ 1\ . ~ \\ \J j \ II.- Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: /) ') BP EXPLORATION QperationsSummary . Rep.ort G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Page 1 of15 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Dåte From - To Hours Task Code NPT Phase Descriptiön of Operations 6/16/2002 18:00 - 19:00 1.00 MOB P PRE Rig Released from 15-31A @ 18:006/16/2002. Hang and secure BOPs. 19:00 - 22:30 3.50 MOB P PRE P/U rig. Move off well. Roll up herculite. R/U & LID rams, PJSM. R/U & LID windwalls. R/U derrick stand. PJSM. Scope & LID derrick. 22:30 - 23:00 0.50 MOB P PRE Jack up rig. Move to front of pad. 23:00 - 23:30 0.50 MOB P PRE W.O. Security & tool service 23:30 - 00:00 0.50 MOB P PRE PJSM on rig move. 6/17/2002 00:00 - 06:00 6.00 MOB P PRE Move rig from DS#15 to G-pad (10 miles). 06:00 - 06:30 0.50 MOB P PRE PJSM prior to raising derrick & windwalls. 06:30 - 11 :00 4,50 RIGU P PRE Raise derrick & windwalls, Scope-in tilt rams, Lay herculite tarps & cellar dykes on G-10, R/O tree cap. Meanwhile de-pressure flowline from 680psi to Opsi. WHP = Opsi. Perform wellsite pre-inspection with pad operator. 11 :00 - 12:00 1.00 RIGU P PRE Move over well onto G-10. 12:00-12:15 0.25 RIGU P PRE PJSM for N/U BOPs. 12:15 - 14:00 1.75 RIGU P PRE Nipple up BOPs. Rig accepted at 12:00 hrs on 6/17/2002. Meanwhile spot & berm cutting tank & flowback tanks. 14:00 - 17:45 3.75 RIGU P PRE PJSM. P/U injector head & M/U guide arch. Stab CT & SIB injector. 17:45 - 18:30 0.75 BOPSURP PRE Prep for BOP testing. Meanwhile take-on 300bbls of 2ppb, 2% KCL milling fluid into rig pits. 18:30 - 00:00 5.50 BOPSUR P OECOMP Pressure test BOPE. Witness of test waived by AOGCC's Chuck Scheve. 6/18/2002 00:00 - 00:30 0.50 CLEAN P DECOMP Weld-on CTC. Pull test. 00:30 - 01 :00 0.50 CLEAN P DECaMP Load dart, fill coil with bio water (41.8 bbls calculated). Bump at 41.0 bbls. 01 :00 - 02:00 1.00 CLEAN P DECaMP PT CTC. Open well -- no pressure, hole full. MU BHA#1 (2-1/8" NaviOrill motor and 2.74" HCC 0331 mill). The mill will pass thru a 2.75" gage ring easily but not a 2.74" gage ring. Change packoff. 02:00 - 02:30 0.50 CLEAN P DECaMP Safety (pre-spud) meeting. lAP = 50 psi. Flowline = 0 psi. 02:30 - 04:30 2.00 CLEAN P DECaMP RIH. Tag and stall 2194' (SSSV landing nipple -- 2.75" ID). Repeat. Try easing into it 1.5/2000. Stall again. Run at it dry -- stack weight and fell through. RIH. 8500' wt check: 25k up; 14k down. RIH. Seeing some motor work 9074'. PU clean. Wash into hole at 40 FPM (1.6/1900). Seeing fluctuation in MW, but no loss in RIH weight. At 9200', bigger bump in MW. Reduce speed to 20 FPM. Steady 150 psi in MW, but nothing hard. PUH slow washing for 50'. Clean. RIH 20 FPM. Tag and stall 9301' (MM out = 20 bbls). 04:30 - 05:30 1,00 CLEAN P OECOMP Mill starting at 9301' (fluid: 2 ppb biozan water). Broke through stringer. Wash thru soft stuff, but with 350 psi of motor work, PU's are clean 27k, Stall 9339', Thick, green cement over shakers (pH = 13), Wash up hole 100', RIH. Mill past hard spot at 9339', Mill to 9350' with 100 psi MW, still very soft. Wiper to 9000'. RIH clean. Stall 9353'. Wash to 9400' -- same thing -- nothing hard, but lots of cement. Wiper at 10 FPM to 9300', RIH clean, 05:30 - 06:00 0.50 CLEAN P DECaMP Wash contaminated cement with 300 psi MW at 50 - 300 FPH to 9450', Wiper to 9350', 06:00 - 06:30 0,50 CLEAN P DECaMP Wash/mill cement with 400 psi MW at 180 FPH to 9500', Clean PUH off bottom, 28k. Wiper to 9450', Printed: 7/10/2002 12:18:31 PM ) ') BP .EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 From- To Hours Task Code NPT Phase 6/18/2002 06:30 - 07:05 0.58 CLEAN P DECaMP 07:05 - 07: 15 07:15 - 08:05 0.17 CLEAN P 0.83 CLEAN P DECaMP DECaMP 08:05 - 09:45 1.67 CLEAN P DECaMP 09:45 - 10:30 0.75 CLEAN P DECaMP 10:30 - 11: 15 0.75 CLEAN P DECaMP 11: 15 - 11 :30 0.25 STWHIP P WEXIT 11 : 30 - 11:40 0.17 STWHIP P WEXIT 11 :40 - 11 :50 0.17 STWHIP P WEXIT 11 :50 - 12:00 0.17 STWHIP P WEXIT 12:00 - 12:45 0.75 STWHIP N SFAL WEXIT 12:45 - 18:15 5.50 STWHIP N SFAL WEXIT 18:15 -19:10 0.92 STWHIP P WEXIT 19:10 - 21:05 1.92 STWHIP P WEXIT 21 :05 - 21:45 0.67 STWHIP P WEXIT 21 :45 - 23:00 1.25 STWHIP P WEXIT 23:00 - 23:15 0.25 STWHIP N OFAL WEXIT 23:15 - 00:00 0.75 STWHIP N WEXIT 6/19/2002 00:00 - 00:30 0.50 STWHIP N OFAL WEXIT 00:30 - 01 :50 1.33 STWHIP N WEXIT 01 :50 - 03:40 1.83 STWHIP N WEXIT 03:40 - 04:00 0.33 STWHIP N WEXIT 04:00 - 05:30 1.50 STWHIP P WEXIT 05:30 - 06:30 1.00 STWHIP P WEXIT 06:30 - 08:00 1.50 STWHIP P WEXIT 08:00 - 10:00 2,00 STWHIP P WEXIT 10:00 - 11 :00 1.00 STWHIP P WEXIT Page 2 of15 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Description of Operations Continue washing green cement to 9600' @ 1.6bpm, 2350/2550psi, & 140fph Rap, Wiper @ 1 Of pm to 9550'. Clean P/U @ 27.5k. RBIH clean. Mill hard cement to 9607' @ 1.6bpm, 2350/2550psi, & 20fph ROP. Grind to a halt @ 9608'. Stack 2.2k WOB & stall. Suspect whipstock tag @ 9608'. Pump down 10bbls of 3.5ppb bio hi-vis around mill. Paint EOP @ 9200' & POOH clean with cement cleanout assy, Saw very slight bobble @ SSSV, OOH. LID cement cleanout BHA#1. Take-on fresh 300bbls of 2ppb, 2% KCL milling fluid into rig pits & dump used cement contaminated KCI water. Displace CT to new KCL water. PJSM on P/U window milling BHA#2. M/U Weatherford orienter to CTC. Surface test orienter - OK, getting 3 for 3. LID orienter. M/U BOT MHA to CTC. Pressure test to 3500psi - OK. SIB injector with MHA. M/U 2.74" HCC DSM to Weatherford 2.5 degs fixed motor for window milling BHA#2. Sperry tiny-trak tools not passing surface tests. Troubleshoot & rectify same. Continue M/U BHA#2 with Sperry tiny-trak MWO tool. 2 jts of 2-1/16" tbg & MHA. Fin resolve problems w/ MWD MU milling BHA RIH w/ BHA #2 (2.5 deg motor, 2.74" DSM). Orient to get by set down at GLM #1 @ 4065' CTO 9600' 30k. RIH and tag @ 9617' CTO. PUH and start motor 1.5/3220 TF at 117R. Orient to 162R. RIH at tag at min rate at 9617'. PUH, check TF at 175L. RIH at rate and first motor work at 9617.9'. Corr to 9620' Begin time milling by procedure 1.5/3165/175L. Mill to 9620.8' Lost 100 psi and stacking wt-no signal from Sperry tool. Flag CT POOH to check BHA. Assume washout above MWO Continue POOH to check BHA Found leak in upper bleed sub, LD. PT MHA, ok, Check rest of BHA, ok. Mill was 10-15% worn RIH w/ BHA #3, SHT. Set down at 4067' CTD at GLM #1, Orient a couple clicks to get by 9600' Chk TF @ 44R. Orient to 129R. RIH at min rate and tag at 9621' CTO. PUH and start pump, 162R. RIH and first motor work at 9619.9' CTO. Corr to 9620' Restart time milling from 9620.0' by procedure 1,5/3330/162R PVT 245 9621.0' 1.5/3320/168R 9621.5', flag pipe, PU l' to begin time milling sequence, 9620,5', WOB=O, String weight=17180 Ibs, CTP=3340 psi at 1.4 bpm, 100% returns, TF 162R 9620,7',08:00 update, WOB=O, SW=13800, CTP=3240/1.4, 100% returns, TF 168R. 9621,7', 10:00 update. WOB=2625, SW=8800, CTP=3340, 100% returns, TF=162R. Printed: 7/10/2002 12:18:31 PM ) ') BPEXPLORA TION Operations..summary.Report Page 3 of 15 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Date From ..;To Hours Task Code NPT Phase Description of Operations 6/19/2002 11 :00 - 12:00 1.00 STWHIP P WEXIT 9622.3',11 :00 update. WOB=3700, SW=7700, CTP=3400, 100% returns, TF=157R. 12:00 - 13:00 1.00 STWHIP P WEXIT 9623.0, 12:00 update. WOB=4300, SW=6900, CTP=3430, 100% returns, TF= 157R. 12:55 - 13:45 0.83 STWHIP P WEXIT 9624.0', Drilling break on WOB and CTP. WOB=6140, SW=5260, CTP=3200, TF=157R. Continue milling at 6 min/0.1'. 13:45 - 13:47 0,03 STWHIP P WEXIT Pickup to check free spin, PU at 27klbs, free spin 3100 psi. 13:47 - 14:25 0.63 STWHIP P WEXIT 9625.8', Continue to attempt to mill ahead. Not making any Rap, just stacking. Check samples. 95% cement, some metal, and definate small amount of formation sand. 14:25 - 15:55 1,50 STWHIP N DPRB WEXIT Despite 100 psi motor work, DO concerned that motor is not working properly. POOH to inspect motor. Paint flag at 9623.0' bit depth. 15:55 - 18:55 3.00 STWHIP N OPRB WEXIT Tag up at surface. Inspect BHA. No problems found. Motor appears to be in good shape. Mill in good shape. The mill guages 2.74", with a swirl pattern on face. Pick up new motor and new fat radius window mill. Swap out Sperry MWO probe, BOT MHA 18:55 - 20:55 2.00 STWHIP N OPRB WEXIT RIH w/ BHA #4 20:55 - 21 :05 0.17 STWHIP N OPRB WEXIT Tag at 9623' CTO. PUH 29k, chk TF 1.5/3250/164R. RIH to 9622.4' and had sli wt loss. Did not correct depth 21 :05 - 22:00 0.92 STWHIP N DPRB WEXIT Resume milling from 9622.4' 1.5/3250/150R Sperry MWO quit pulsing when 1.5k stacked at 9623.0'. Work to get tool restarted and not 22:00 - 23:35 1.58 STWHIP N OFAL WEXIT POOH for MWO 23:35 - 00:00 0.42 STWHIP N DFAL WEXIT Change MWO probe. Check BHA 6/20/2002 00:00 - 00:40 0.67 STWHIP N OFAL WEXIT Fin change MWO probe and check BHA. Mill had center wear. SS found solenoid that controls pulse to be bad 00:40 - 01 :05 0.42 STWHIP N WEXIT RIH w/ BHA #5. SHT, pulse ok, but not sending directional data (SS forgot to program it). POOH 01 :05 - 02:05 1.00 STWHIP N WEXIT Reprogram SS MWO probe. Change out MHA 02:05 - 03:50 1.75 STWHIP N WEXIT RIH w/ BHA #6 SHT 03:50 - 04:25 0.58 STWHIP N WEXIT 9600' PUH 28.9k and chk TF @ 175L. RIH at min at tag at 9623.5' CTO. PUH and chk TF @ 158L. Orient around to 157R. RIH 04:25 - 05:40 1.25 STWHIP P WEXIT First motor work at 9622.5' (did not correct). Resume time milling from here 0.1'/6 min 1.4/3320/152R 1000# WOB. Get a click at 9623.1' 05:40 - 06:30 0.83 STWHIP P WEXIT 9623.5' 1.4/3250/174R 3000# WOB 06:30 - 07:50 1.33 STWHIP P WEXIT 9624,4', Pump 15 bbl hig h vis sweep to check for formation cuttings, Milling ahead at 1 fph. Free spin 3320 spi, CTP=3450 psi, String Wt=8900 Ibs, WOB=4150 Ibs. 1,5 bpm, 100% returns. Geo reports trace of sand in cuttings, 07:50 - 09:05 1,25 STWHIP P WEXIT 9626,0', Drilling break, Rap picked up, String weight came back, CTP dropped, Getting drill offs. We appear to be in open hole. Drill ahead to get 10' of rathole. Geo reports significantly more sand in cuttings and some chert, 09:05 - 10:00 0,92 STWHIP P WEXIT 9628,2', Several stalls, Try milling down easily. Possibly chert pebbles or junk from window, 10:00 - 10:50 0.83 STWHIP P WEXIT 9631', We have 6' of open hole, and Rap has slowed down. 1.251 STWHIPlp Pump 10 bbl 2# biozan sweep. 10:50 - 12:05 WEXIT POH, Sample shows 15% formation and a lot of metal I I Printed: 7/10/2002 12:18:31 PM ) ) BP EXPLORATION Operations .Sum maryReport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 6/20/2002 6/21/2002 G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 From- To Hours Task Code NPT Phase 10:50 - 12:05 1.25 STWHIP P WEXIT 12:05 - 13:00 0.92 STWHIP P WEXIT 13:00 - 13:30 0.50 STWHIP N SFAL WEXIT 13:30 - 15:10 1.67 STWHIP P WEXIT 15:10 - 15:40 0,50 STWHIP P WEXIT 15:40 - 15:45 0.08 STWHIP P WEXIT 15:45 - 16:00 0.25 STWHIP P WEXIT 16:00 - 16:15 0.25 STWHIP P WEXIT 16:15 - 16:30 0.25 STWHIP P WEXIT 16:30 - 18:30 2.00 STWHIP P WEXIT 18:30 -19:15 0.75 STWHIP P WEXIT 19:15 - 22:30 3.25 STWHIP P WEXIT 22:30 - 00:00 1.50 STWHIP P WEXIT 00:00 - 00:15 0.25 STWHIP P WEXIT 00:15 - 00:35 0.33 STWHIP P WEXIT 00:35 - 03: 1 0 2,58 STWHIP P WEXIT 03:10 - 03:30 0.33 STWHIP P WEXIT 03:30 - 04:35 1.08 STWHIP P WEXIT 04:35 - 05:55 1.33 STWHIP P WEXIT 05:55 - 06:30 0.58 STWHIP P WEXIT 06:30 - 07:05 0.58 DRILL P PROD1 07:05 - 07:45 0,67 DRILL P PR001 07:45 - 07:55 0.17 DRILL P PR001 07:55 - 09:00 09:00 - 09:45 1,08 DRILL P 0,75 DRILL P PROD1 PR001 09:45 - 10:10 0.42 DRILL N OFAL PR001 Page 4 of15 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Description of Operations shavings. OOH. P/U crayola and 1.75 Weatherford motor. SWS computer kept crashing. Time to defrag hard disk prior to RIH. RIH with BHA #7. Crayola Mill and 1.75 deg motor to dress window. Kick on pumps, 1.5/1,5/3360 psi. Orient BHA to window orientation 150R. Dress window with crayola mill. Tagged up at 9623', Mill down from 9620'. Orient back around to 162R. Dress Window. Orient around. Mill keeps getting bites, and flopping over to 140L. Need to orient around to 170R again. Dress window to 9622.0'. Work on a burr at 9623.2' 1.5/3360/170L 9624.0' Appears the worst is past. Ease in hole. Pump 20 bbl bio pill followed by used Flo Pro mud Another burr at 9624.7'-get to 9624.8' Mill a burr at 9624.8' 1.5/3350/170L. Hole completely displaced Orient around Continue milling burr at 9624.8' 1.5/3350/170R 9625.8' Out of window. Ream open hole w/ 300 diff and stacking 5k to 9628.7' (assume mill is still full gauge) Ream/backream window area at 154L and 145R. Sperry tool cutting out on last pass. Dry tag, clean POOH for drilling assy LD milling BHA. Mill recovered in gauge. 2.74". Make up build section BHA. BHI motor, Hughes 2.70"x3.0" Bi center bit. ***************************U S E CA UTI 0 N HE RE************************************ First Hughes bit made up by DO was the old style 2.75"x3.0", It would not pass a 2.75" sleeve after being made up. Lots of these bits are still out there ready to be a cork in a bottle on small windows. Need to be sure to use the smaller pass thru bits. RIH with BHA # 8, Hughes bi center bit, Sperry orienter. Note, Sperry MWO tool was intermittant on last run, Same tool has been run back in the hole at Sperry's reccommendation, They suggest it is the best option with the tools currently on the slope, Shallow hole test of sperry orienter and MWO tools at 3200' (10 Oeg inclination), All passed ok, Continue RIH. Make tie in pass up from 9515'. Sperry MWD tool not starting on bottom. Same symptoms we observed yesterday. Had to bounce BHA around to get it to work, Log pass up from 9515', made +1' correction. RIH thru window clean, tag bottom at 9629', pick up and catch 3 clicks, Pumps back up, and Sperry tool is not working again, I Tag bottom and mess about with bit in open hole trying to get it I Printed: 7/10/2002 12:18:31 PM ') ') BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 From"" To Hours Task Code NPT Phase 6/21/2002 09:45 -10:10 0.42 DRILL N OFAL PROD1 10:10 -10:20 0,17 DRILL N DFAL PR001 10:20 - 10:40 0.33 DRILL N OFAL PR001 10:40 - 12:05 1.42 DRILL N OFAL PR001 12:05 -12:15 0.17 DRILL N DFAL PR001 12:15-12:35 0.33 DRILL N DFAL PR001 12:35 - 12:50 0.25 DRILL N DFAL PROD1 12:50 - 14:10 1.33 DRILL N OFAL PROD1 14:10-15:00 0.83 DRILL N DFAL PR001 15:00 - 16:45 1,75 DRILL N OFAL PR001 16:45 - 19:00 2.25 DRILL P PROD1 19:00 - 23:45 4.75 DRILL P PROD1 23:45 - 00:00 0.25 DRILL P PROD1 6/22/2002 00:00 - 00:45 0.75 DRILL P PR001 00:45 - 01 :30 0.75 DRILL P PR001 01 :30 - 02:00 0.50 DRILL P PR001 02:00 - 03:30 1.50 DRILL P PR001 03:30 - 06:30 3.00 DRILL P PR001 06:30 - 08:10 1,67 DRILL P PROD1 08:10 - 08:30 0,33 DRILL P PR001 08:30 - 08:35 0,08 DRILL P PR001 08:35 - 10:00 1.42 DRILL P PR001 10:00 - 11 :00 1.00 DRILL P PR001 11 :00 - 12:00 1,00 DRILL P PR001 12:00 - 13:00 1,00 DRILL P PR001 13:00 -14:00 1.00 DRILL P PROD1 Page 5 of 15 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Description of Operations to work with no success. Pick up into casing and it worked fine. Run back to open hole, and Sperry tool doesn't work again. Tag bottom for 2nd time and it finally kicked on. $#@$%^&%$%. MWO tool working, drill ahead from 9629'. Free spin 3060 psi. 1.4/1.4/3220 psi. 45 fph, TF=136L. 9634', Orient around. Resume drilling, TF120L. 9669', MWO tool not getting good detection. Not able to see tool face or get a survey at this time. Carry on drilling blind, assuming TF is where we left it. Will need surveyor confirmed tool face by 9680'. 9675', MWO not detecting properly. Signals from downhole Keep dropping out, and when working are too weak. Mess about as before to try to get it working. Cycle pumps, pull up/down, tag bottom, etc. MWD mysteriously started working again. Carry on drilling. 9679', MWD down again. Enough of this messing about. POOH to change out MWD tool. Tag up at surface, swap out MWD tool. Check bit. Bit shows no wear, no chipped cutters. MU injector. RIH with same 2,12 deg build section motor and, Hughes bi centered bit, and a new Sperry MWD probe and pulser. Shallow test at 500', ok. RIH thru window slick, kick on pumps. TF=78L. Free spin 3000 psi at 1.5 bpm. 100% returns. RIH to tag up, subtract 3.0', resume drilling at 9679'. Drill and orient from 9710' 1.5/31 00/70L PVT 333. Drill to 9787' Orient around Continue orient around-only getting 10 deg/click Drilling from 9787' 1.5/3350/1 OOL PVT 329 Drilling from 9798' 1.5/3050/1 OOL (lost 300 psi). Drill to 9801' and motor stalls too quick. Assume washed out bleed sub or weak motor PTOH OOH. Nothing obviously amiss. Check MWD screen and clean. WO motor. Change motor and orientor RIH w/ BHA #10. Shallow hole test of MWD and orienter at 3200', passed ok, log tie in pass up, Make -3' correction, RIH, resume drilling. Geo reports last cutting samples showed 60-70% chert. Expect hard drilling. Resume drilling from 9801 '. Free spin 3150 psi, 1.5/1,5/100% returns. TF= 67L. Drilling at 3520psi. ROP very slow. Geo indicates we should be in chert to about 9960' MO, 9805', (Made 4.0'), Hard drilling. 1,5/1,5/3300psi. TF=67L, Pit Vol=328 bbls. 9809,6', (Made 4.6'), Hard drilling. 1.5/1.5/3290 psi, TF=78L, Pit Vol=328 bbls, 9812.1', (Made 2,5'), Hard drilling, 1,5/1.5/3380 psi, TF=73L, Pit Vol=327 bbls, 9816,9', (Made 4,8'), Hard drilling, 1,5/1,5/3340 psi, TF=67L, Pit Vol=326 bbls. Printed: 7/10/2002 12:18:31 PM ) ) Page 6 of 15 BP EXPLORATION Operations Summary..Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Hours Task Code NPT Phase Description of Operations 6/22/2002 14:00 - 15:00 1.00 DRILL P PR001 15:00 - 16:00 1.00 DRILL P PROD1 16:00 - 16:50 0.83 DRILL P PROD 1 16:50 - 17:45 0.92 DRILL N DFAL PROD1 17:45 - 18:10 0.42 DRILL P PR001 18:10 - 20:00 1.83 DRILL P PR001 20:00 - 21 :35 1.58 DRILL P PR001 21 :35 - 00:00 2.42 DRILL P PR001 6/23/2002 00:00 - 01 :30 1.50 DRILL P PROD1 01 :30 - 01 :40 0.17 DRILL P PR001 01 :40 - 03:10 1.50 DRILL P PR001 03: 1 0 - 03:45 0.58 DRILL P PROD1 03:45 - 03:55 0.17 DRILL P PR001 03:55 - 05:05 1.17 DRILL P PR001 05:05 - 06:10 1.08 DRILL P PROD1 06:10 - 07:50 1.67 DRILL P PROD1 07:50 - 08:15 0.42 DRILL P PROD1 08:15 - 09:00 0.75 DRILL N OFAL PR001 09:00 - 09:20 0.33 DRILL P PROD1 09:20 - 10:00 0.67 DRILL P PR001 10:00 - 11 :00 1,00 DRILL P PR001 11:00 -12:00 1.00 DRILL P PROD1 12:00 -13:15 1,25 DRILL P PR001 13:15-13:40 0.42 DRILL P PR001 13:40 - 14:15 0.58 DRILL P PROD1 14:15 - 15:50 1.58 DRILL P PR001 9820.8', (Made 3.9'), Hard drilling, 1.5/1.5/3320 psi, TF=67L, Pit Vol=325 bbls. 9827.4', (Made 6.6'), Hard drilling, 1.5/1.5/3250 psi, TF=67L, Pit Vol=327 bbls. 9832.4', (Made 5.0'), Hard drilling, 1.5/1.5/3210 psi, TF=67L, Pit Vol=327 bbls. 9840.5', (Made 8.1' in last 45 minutes) ROP picking up slightly. Sperry surveys look questionable. Last one gave a dogleg of 70 deg/100', Pickup to recheck to the casing shoe, Checked 4 surveys, Found azimuth repeatability of from 1 to 9 deg, Not acceptable, Re survey on way back in the hole. At low pump rates the 2nd and third surveys seem to agree. Which one do you believe? Orient around to 70L. 9840.5', Resume drilling. 9850.0' 9861.6' Survey at 0.8 bpm. Continue painfully slow drilling in 22 1.5/3100/90L to 9877' Continue slow drilling in cherty 22 from 9877' using suspect surveys showing more turn than plan Wiper to window POOH for lesser bend motor, MWO probe and bit check. Plan to land in transition above HOT @ 10090' MD LO drilling BHA. Bit 2-2-1 Safety mtg re: cut CT, weld-on CTC Cut off CTC. Cut off 200' CT to manage life. Weld on CTC, PT 32k, 3500 psi MU drilling BHA w/ new MHA RIH w/ BHA #11 (1.5 deg motor) Log tie in pass accross RA pip tag at 9626'. Make -1.5' correction. Repeat open hole directional surveys. Using different MWO probe than was used on previous runs. These surveys agree with the ones taken yesterday with the first MWD tool, but only when it was operated at 0.8 bpm. Future surveys with this tool will need to be performed when pumping at less than full rate. Surveys taken while drilling can not be trusted at this time. Orient to high side. 9886.7', Resume drilling hard formation. Free spin 3100 psi. 1.5/1.5/3200 psi, 100% returns, 328 bbls pit vol. 9889.0', Drilling chert. Free spin 3000 psi. 1.5/1.5/3100 psi. 100% returns. 328 bbls pit volume, 9897.1', (Made 8.1' in last hour) Geo reports 60-70% chert in samples, trace of pyrite, 1,5/1.5/3100 psi. 100% returns, 327 bbls pit volume. 9903,2', (Made 6,1' in last hour). ROP is unacceptable, POOH to pick up new bit. Will attempt a Hycalog bit this time around. 200', Fire drill, rig evacuation, and safety debrief, Tag up at surface, Change out bits from Hughes bi center to Hycalog bi center. Hughes bit in good shape. Graded 2/2, Rest of BHA remains the same. RIH with BHA #12 to finish build section, Hycalog bicenter bit, 1,5 deg motor. ¡ I Printed: 7/10/2002 12: 18: 31 PM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 7 of 15 OperationsSu m maryReport G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 6/23/2002 15:50 -16:10 From - To Hours Task Code NPT Phase PROD1 16:10 -18:00 18:00 - 19:00 19:00 - 19:40 19:40 - 20:10 20:10 - 21 :40 21 :40 - 23:20 6/24/2002 23:20 - 00:00 00:00 - 01 :00 01 :00 - 01 :20 01 :20 - 01 :45 01 :45 - 02:30 02:30 - 03:25 03:25 - 03:40 03:40 - 04:55 04:55 - 05:30 05:30 - 08:30 08:30 - 10:30 10:30 - 15:00 15:00 - 16:10 16:10 - 17:50 17:50 - 18:30 0.33 DRILL P 1.83 DRILL P PROD1 1.00 DRILL P PR001 0.67 DRILL P 0.50 DRILL P PR001 PR001 1.50 DRILL N 1.67 DRILL N DFAL PROD1 PROD1 0.67 DRILL N 1.00 DRILL N 0.33 DRILL N PROD1 OFAL PROD1 PROD1 0.42 DRILL N 0.75 DRILL P PROD1 PROD1 0.92 DRILL N DFAL PROD1 0.25 DRILL P PROD1 1.25 DRILL P 0,58 DRILL P 3.00 DRILL P PR001 PROD1 PROD1 2,00 DRILL N SFAL PR001 4.50 DRILL P 1,17 DRILL P PR001 PR001 1.67 DRILL P 0.67 DRILL P PROD1 PR001 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Description of Operations Tag up, make -6' correction to last tag, kick on pumps. Free spin=3000 psi. Orient to high side. 9903', Resume drilling. Tag bottom, stall twice, then took off. Finally getting decent ROP! Drilling ahead at 45 fph. Plan forward is to drill to land well, then recheck survey azimuths. 1.5/1.5/3200 psi, 328 bbls pit vol. TF=16L. Geo caught sample from just starting drilling on this run (9903'), Chert=50%. Geo caught sample 3' later. Chert=5%. Is our faster ROP due to bit or formation changes? 9993', update at 18:00. 1.5/1.5/3400 psi. Not as many stalls now, and ROP increasing. Up to 90 fph now. Pit vol=329 bbls. 10020' Work thru a shale from 10008' 1.4/3040/1 L PVT 329 10060' Still in shale, a little sticky. Wiper to window. Overpull at 9690' and motor stalled. RIH w/ motor stalled. Work between 9700 and 9800' to get rid of assumed debris on bit w/o success. PUH thru window, clean, but motor still pressured up POOH to check bit/motor Found motor locked up (shop teardown found that matrix coating on drive sub peeled off and locked up bearing section), all other tools ok, Check MWO probe for centralizer loss and pulser screen was clean. WO motor. MU same bit, new motor RIH w/ BHA #13 (1.8 deg motor, same HYC bit) Continue RIH w/ BHA #14 RIH thru window, clean. Precautionary ream to TO 1.5/3250/140L Orient to HS Drilling 1.5/3250/4L finishing build. Sticky at times due to diff. Drill to 10107' and see 86 deg-good enough for this motor. SS tool also starting to work intermittent. Will land as planned in transition zone above HOT at 8970' TVO. Will need to come up to 8950' TVO to drill target sand Wiper to window performing check shot surveys at red rate (0.8 bpm). All match drilled surveys Fin wiper to window. Test MWD in tbg and working intermittent. Assume solenoid problem again POOH for lateral assy LO drilling BHA Weekly BOPE test. Witness waived by AOGCC. All passed ok. Sperry troubleshot equipment during BOP test. No problems found with downhole eq. Eaualizer port on TOT BOP's leaking during body test. Call for new parts from Oeadhorse. Chase threads and replace valve. BOP test completed. All passed ok. Make up BHA #14, RIH with 1,1 deg motor and Hycalog bi center bit to drill lateral section. RIH with BHA #14, Log tie in pass, Sperry MWO tool not working in high dog leg section near window, Pull up until it works, Log tie in pass Printed: 7/10/2002 12:18:31 PM ') BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Date From- To Hours Task Code NPT Phase Description of Operations 6/24/2002 17:50 - 18:30 0.67 DRILL P PR001 over RA tag. Make -2' correction. 18:30 - 18:45 0.25 DRILL P PROD1 RIH and tag TO at 10113' 18:45 - 19:30 0.75 DRILL P PROD1 Drill from 10113' 1.5/3200/81 L 19:30 - 20:30 1.00 DRILL P PR001 Stacking and stalling and occasional good overpull from 10170' while building angle to intersect target sand at 10350' as requested via email 20:30 - 21 :30 1.00 DRILL P PR001 Orient around from 10185', Getting 10 deg/click no matter how many are done-orientor in fail-safe mode 21 :30 - 22:20 0.83 DRILL P PR001 Drill from 10185' 1.5/3450/90L and get drilling break at 10193'. Drill to 10204'. 100' wiper. Drill to 10236' and stacking wt 22:20 - 22:45 0.42 DRILL N STUC PROD1 PUH and were stuck w/ motor stalled. Circ OH clean. SD pump w/ stacked wt 22:45 - 23:00 0,25 DRILL P PROD1 Pull free at max pull. Wiper to window 23:00 - 23:35 0.58 DRILL P PR001 Log tie-in, up from 9660' (SS tool not working until 9652'). Got a bad data pt which confused the issue. Sort out and add 7.0' 23:35 - 00:00 0.42 DRILL P PR001 RBIH, clean. Tag TD at 10236' w/ TF @ 50L 6/25/2002 00:00 - 00:45 0.75 DRILL N STUC PR001 Tag TO at 10236'. Orient around (lost TF when stuck). Getting 10 deg/click 00:45 - 01 :40 0.92 DRILL N STUC PR001 Start to drill and stuck again! Park w/ sli bind. Circ new mud to bit. Pull free w/ 20K over. GR subsequently showed hi perm sand at 10222' 01 :40 - 03:10 1.50 DRILL P PROD1 Resume drilling while finishing swap to new mud 1,5/3140/109L. Drill to 10317' and building angle w/ avg 105L 03:10 - 04:15 1,08 DRILL P PROD1 Orient around. Still 1 0 deg/click 04: 15 - 04:45 0,50 DRILL P PROD1 Drill from 10317' 1.5/3130/172R working back thru 14N shale 04:45 - 05: 1 0 0.42 DRILL P PROD1 Drill from 10350' 1.5/3150/90L in target sand 120-150'/hr. Drill to 10400' (8956' TVO) at 90.5 deg PVT 233 05:10 - 05:35 0.42 DRILL P PROD1 Wiper to window 05:35 - 05:55 0.33 DRILL P PR001 Tie-in from 9660' logging up (SS tool not working until 9657'), add 3.0' 05:55 - 06:20 0.42 DRILL P PROD1 RBIH 06:20 - 07:00 0.67 DRILL P PR001 Orient around. TF now at 40L, need 120L. Orienter only giving us 10 deg clicks. 07:00 - 07:10 0.17 DRILL P PROD1 10400', Resume drilling 1.4/1.4/3500 psi. Free spin=3200 psi. TF114L. 07:10 - 07:20 0.17 DRILL P PROD1 Need to catch a couple more clicks to take care of reactive. 07:20 - 07:40 0.33 DRILL P PROD1 Resume drilling. 1.4/1.4/3600. ROP=85 fph. Pit Vol=226 bbls, String wt=1 Ok, WOB=2500 Ibs. 07:40 - 08:00 0.33 DRILL P PROD1 Orient to 50R. Orienter still giving 10 deg clicks, slow process. 08:00 - 08:25 0.42 DRILL P PROD1 10445', Resume drilling. 08:25 - 09:50 1,42 DRILL P PROD1 10470', orient to 70R. 09:50 - 10:40 0,83 DRILL P PROD1 10550', Wiper trip to the window. Reasonably clean PU off bottom at 26klbs. 10:40 - 11 :00 0.33 DRILL P PR001 Back on bottom drilling. 1.4/1.4/3450. Pit Vol=218 bbls. Appear to be loosing a little mud. 11 :00 - 11 :50 0.83 DRILL P PROD1 10597', Orient to 135 R. Orienter only giving 10 deg clicks, Try drilling, and end up getting 180 deg of reactive. Having to make several attempts to account for the reactive, Tag/drill, PU, orient, repeat, repeat. 10 degree orienter makes orienting slower. Fast ROP drilling makes it easy to drill at the wrong tool face, 11 :50 - 12:20 0,50 DRILL P PR001 Resume drilling 1.5/1,5/3800 psi, 216 bbls pit volume. Free I spin 3300 psi. Printed: 7/10/2002 12:18:31 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date Operations Summary Repo.rt G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 6/25/2002 12:20 - 12:50 From- To Hours Task Code NPT Phase PR001 12:50 - 13:00 13:00 - 13:05 13:05 - 13:25 13:25 - 13:35 13:35 - 14:00 14:00 - 14:30 14:30 - 14:55 14:55 - 15:03 15:03 - 15:25 15:25 - 16:05 16:05 - 16:30 16:30 - 17:00 17:00 - 17:45 17:45 - 18:30 18:30 - 18:50 18:50 - 19:15 19:15 - 19:30 19:30 - 19:45 0.50 DRILL P 0.17 DRILL P PR001 0.08 DRILL P PR001 0,33 DRILL N STUC PR001 0.17 DRILL N STUC PR001 0.42 DRILL N STUC PROD1 0.50 DRILL N STUC PROD1 0.42 DRILL N 0,13 DRILL N STUC PROD1 STUC PR001 0.37 DRILL N STUC PROD1 0.67 DRILL N STUC PROD1 0.42 DRILL P PR001 0,50 DRILL P 0,75 DRILL P 0,75 DRILL P 0,33 DRILL P PROD1 PROD1 PR001 PROD1 0.42 DRILL P PR001 0,25 DRILL P PR001 0,25 DRILL P I PROD1 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Description of Operations 10644', There is a question about the surveys again. ReSurvey the last 100' of hole at 0.8 bpm. TVD depth at current TO appears to be 8944'! Plan was to keep it between 8953-8957'. Orient around to straight down. Resume drilling. Holding TF=180, Not getting huge reactives now, only 20-30 deg. 10668', Attempt to get survey right on bottom. Yo-yoing pipe Pumping 0,8 bpm. 10657', Stacking weight on last yo-yo down. Make PU, and are stuck, probably differentially, and probably 10' off bottom. Pull max, and can't get free. SI pumps, attempt relax technique. No luck. Pull max after 15 minutes. No success. Continue to work pipe. Kick pumps on. Took 2 bbls to get full returns. Pit level at 13:25=211 bbls. Pumping 1.2 bpm, CTP=3500 psi. 10657', SI pumps. Try relax method again. Slack off to 9000# string wt. (Neutral Wt) Call for crude transport. No luck pulling free. Pull to 62klbs 3 times. Kick pumps on, 1.4 bpm, 3900 psi. Held for 5 minutes, then saw a drop in CTP to 3200 psi. at the same rate. Bit free? Clear of packed off material? Work pipe, still stuck, Can't go up or down. Continue to circulate. Bring rate up to 1.7 bpm, getting 100% returns now, Circulate bottoms up. Start pumping 20 bbls of 8% lubtex pill. Still waiting on crude. OH displaced 5 bbls of slick mud. SI pumps and work pipe several times with no success. Slack off to 0 string wt., resume pumping, pump remainer of slick sweep. 1.7 bpm, 3870 psi CTP. Work pipe while pumping. No success. Pit level 206 bbls. Pull up to 28klbs, SI pumps for 10 minutes. Work pipe, pull 50klbs, bring pumps on. No success. rate 1.4 bpm, CTP=3900 psi. Looks like we are packed off, or bit locked again. Continue pumping. Crude transport on location. Continue to pump mud while hooking up crude. After 5 minutes pressure started to drop off back to free spin. Pump 10 bbls crude. (Open hole vol=5 bbls). Follow with mud. New pit volume=218 bbls, Pressure back up. CTP=4015 @ 1,5 bpm. Note-crude in coil. Also note - TF hasn't moved at all. We have cycled CTP numerous times with no change in TF. Pulled free, wiper trip to shoe. Circ. out 10 bbl crude pill and discard a total of 46 bbls contaminated FloPro / crude. Logged tie-in with GR. Added 7 ft to CTO, RIH to TO, Tag TO at 10,672 ft, Orient TF to 100R. Drill to 10688' @ 105R TF, 1,5/1.5bpm, 3600/4000psi, 2k WOB, & 39fph ave ROP. Drill to 10703' @ 120R TF, 1,5/1.5bpm, 3600/4000psi, 2k WOB, & 41fph ave ROP, Drill to 10736' @ 120R TF, 1,5/1,5bpm, 3600/4000psi, 2k WOB, & 94fph ave ROP. Drill to 10753' @ 127R TF. 1.5/1,5bpm, 3600/4000psi, 2k WOB, & 85fph ave ROP. Getting better MWO pulses while Printed: 7/10/2002 12:18:31 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ) ) BP EXPLORATION Operations Summary Report Page 10 of 15 G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Date From - To Hours Task Code NPT Phase Descriptiohof Operations 6/25/2002 19:30 - 19:45 0.25 DRILL P PR001 drilling on btm than while off btm. Take on additional 1 OObbls of fresh FloPro mud. 19:45 - 21 :00 1.25 DRILL P PR001 Attempt to orient TF around to 90R - can't estimate correct clicks, TF @ 140R. Continue orienting again while moving pipe. Decide to orient to 90-1 OOL. 21 :00 - 21 :25 0.42 DRILL P PR001 Drill to 10775' @ 90-1 OOL TF, 1.5/1,5bpm, 3550/3950psi, 2k WOB, & 30fph Rap, 21 :25 - 21:40 0.25 DRILL P PR001 Drill to 10784' @ 90-100L TF, 1.5/1.5bpm, 3550/4040psi, 3k WOB, & 36fph Rap. Wt stacking. 21 :40 - 22:50 1.17 DRILL P PR001 Wiper trip to window. 27k up wt. RBIH to btm 12k down wt. 22:50 - 23:00 0.17 DRILL P PR001 Orient to 80-90L & drill blind to 10790' @ 1,5/1.5bpm, 3550/4000psi, 3k WOB, & 36fph ave Rap. 23:00 - 23:25 0.42 DRILL P PROD1 Orient 3 clicks & drill to 10803' @ 90L TF, 1.5/1.5bpm, 3550/4000psi, 3k WOB, & 28fph ave Rap. 23:25 - 00:00 0.58 DRILL P PR001 Orient 3 clicks & drill to 10828' @ 45L TF, 1.5/1.5bpm, 3550/4000psi, 3k WOB, & 60fph ave Rap. MWO tool not getting good surveys. Try pumping @ 1.4bpm and finally got a good survey. 6/26/2002 00:00 - 00:45 0.75 DRILL P PR001 Drill to 10864' @ 30-45L TF, 1.5/1.5bpm, 3550/4000psi, 3k WOB & 47fph ave Rap. Geologist seeing some good sand samples, Estimate 90degs @ the bit. Would try to hang-in the good stuff. 00:45 - 01 :20 0.58 DRILL P PROD1 Orient TF to 1 OOL. 01 :20 - 01 :55 0.58 DRILL P PR001 Drill to 10897' @ 90-1 OOL TF, 1.3/1.3bpm, 3220/3750psi, 3k WOB & 55fph ave Rap. 01 :55 - 02:15 0.33 DRILL P PR001 Drill to 10905' @ 125L TF, 1.3/1.3bpm, 3220/3750psi, 3k WOB & 29fph ave Rap. Stacking wt. 02: 15 - 02:25 0.17 DRILL P PR001 Short wiper to 10820'. 02:25 - 02:30 0.08 DRILL P PROD1 Drill to 10915' @ 120L TF, 1.3/1.3bpm, 3220/3750psi, 3k WOB. Still wt stacking. Pull heavy. 02:30 - 03:45 1.25 DRILL P PR001 Wiper to 9680'. Hole clean. RBIH to btm. 03:45 - 03:55 0.17 DRILL P PROD1 Drill to 10921' @ 120-130L TF, 1.3/1.3bpm, 3220/3650psi, 3k WOB & 32fph ave Rap. 03:55 - 04:15 0.33 DRILL P PR001 Orient 3 clicks & drill to 10944' @ 1 OOL TF, 1.3/1.3bpm, 3220/3800psi, 3k WOB & 49fph ave ROP. MWD tool not getting any TFs & surveys - seems to always malfunction after every wiper trip. 04:15 - 04:30 0,25 DRILL N OFAL PR001 Troubleshoot parameters to see if MWD survey data will improve - No luck, Need to confirm TFs & surveys & can't drill blind. Also MWO battery life expected to runout @ 10:00 hrs. Thus decide to POOH to C/O BHA. 04:30 - 06:30 2.00 DRILL N OFAL PR001 POOH for BHA C/O, 06:30 - 08:15 1,75 DRILL N DFAL PR001 C/O entire BHA except for bit. Found upper 2 Sperry MWD rubber centralizers were fluid cut and mostly missing. M/U new 1,1 deg motor and Re-run Hycalog bi-center bit. 08:15 - 08:30 0.25 DRILL P PR001 SAFETY MEETING, Reviewed last 3 drilling department incidents, Discussed staying alert and being properly trained for special rig operations, 08:30 - 09:30 1,00 DRILL N DFAL PR001 RIH with MWO BHA #15, 1.1 deg motor, Bit #15 RR, Hycalog 2.7 x 3,0" bi-center bit. Shallow test Sperry tools, Not able to orient. 09:30 - 10:30 1.00 DRILL N OFAL PR001 POOH for another orienter. Rig on down time, 10:30-11:00 0.50 DRILL IN OFAL PR001 C/O Sperry Orienter with another Sperry Orienter. Printed: 7/10/2002 12:18:31 PM ) ) BPEXPLORA TION Operations Summary R~port Page 11 of 15 Legal Well Name: G-10 Common Well Name: G-10 Spud Date: 3/27/1981 Event Name: REENTER+COMPLETE Start: 6/12/2002 End: 6/30/2002 Contractor Name: NORDIC CALISTA Rig Release: 6/30/2002 Rig Name: NORDIC 1 Rig Number: From- To Hours Task Code NPT Phase Description of Operations 6/26/2002 11 :00 - 11 :30 0.50 DRILL N DFAL PROD1 RIH and test orienter. Tested OK. Getting good signal from Sperry tools. Rig off down time. 2 hours down time. 11 :30 - 13:00 1.50 DRILL N OFAL PROD1 RIH with lateral MWD BHA #15. 13:00 - 13:30 0.50 DRILL N OFAL PROD1 Attempt to log GR tie-in. Sperry pulser not giving a useable signal. Surge pumps, pull into tubing, surge pumps. No Luck. Sperry does not have another working pulser. Call for BHI MWO equipment and personnel. 13:30 - 14:45 1.25 DRILL N DFAL PROD1 POOH to change out MWD tools. 14:45 - 15:30 0.75 DRILL N OFAL PR001 LlO Sperry MWD tools. 15:30 - 17:30 2,00 DRILL N OFAL PR001 R/U BHI MWO trailer, surface equipment and MWD BHA. 17:30 - 19:00 1.50 DRILL N OFAL PR001 M/U BHI MWD BHA #16 with 1.1 deg motor and Bit #16 RR, Hycalog 2.7 x 3.0" bi-center bit. 19:00 - 20:45 1,75 DRILL N OFAL PROD1 RIH with BHA #16 & SHT tools @ 2750' & orienter @ 4000'. Sync MWD & obtain good TF readings for different clicks. Set depth encoder 20:45 - 22:00 1,25 DRILL N OFAL PROD1 Continue RIH to 9660'. 22:00 - 22:50 0.83 DRILL N OFAL PROD1 Log-up GR & tie-into RA tag @ 9626'. Subtract 3' ftom CTO. 22:50 - 23:45 0.92 DRILL N DFAL PROD1 Continue RIH & set down in shale @ 10330' - 10370'. Ream thru @ original TF & continue RIH to TO tagged @ 10943'. Observe BHI azimuth surveys at TD to be +/-50 degs off from Sperry surveys. 23:45 - 00:00 0.25 DRILL N DFAL PR001 Resurvey check shots. 6/27/2002 00:00 - 00:40 0.67 DRILL N DFAL PR001 Resurvey check shots @ 10892.71' & 10856,76' - observe consistent azm readings with Sperry surveys. Troubleshoot & discover that BHI system was corrupted while importing Sperry ASCII survey data leading to the initial 50degs azm swing. Shoot & confirm with 2 more consistent check shots @ 10752.69' & 10603.46'. 00:40 - 00:50 0.17 DRILL N DFAL PROD1 RBIH to btm to resume drilling. 00:50 - 02:30 1.67 DRILL P PROD1 Orient 3 clicks & drill shale to 10998' @ HS-15L TF, 1.5/1.5bpm, 3200/3500psi, 3k WOB & 26fph ave ROP. 02:30 - 04:10 1.67 DRILL P PROD1 Orient around & drill to 11025' @ 90L TF, 1.5/1.5bpm, 3250/3550psi, 3k WOB & 40fph ave ROP. 04: 10 - 04:45 0.58 DRILL P PR001 Orient & drill shale to 11049' @ HS TF, 1.5/1.5bpm, 3350/3700psi & 35fph ave ROP. 04:45 - 06:00 1.25 DRILL P PROD1 Orient around & drill to 11080' @ 75-90L TF, 1.5/1.5bpm, 3150/3550psi, 3k WOB & 45fph ave ROP. Occasional wt stacking, 06:00 - 07:10 1,17 DRILL C PROD1 Drilling, 1.5/1,5 bpm, 3300 / 3600 psi, 40 fph, TF = 170R, Trying to reduce incl to stay in target sand, Drilled to 11,100 ft. 07:10 - 09:00 1,83 DRILL C PROD1 Wiper trip to window. Motor work at 10320'. Clean to window. RIH, Ream down at 10 fpm across 10,315-10,330 ft. RIH clean to TO. 09:00 -10:15 1,25 DRILL C PROD1 Drilling, LS TF to reduce incl. 1.5 /1.5 bpm, 3200-3700 psi, Swap well to new FloPro Fluid. Saw 200 psi drop in circ press and 2K less up wt. Up wt = 24K, Dwn wt = 11 K, Drilled to 11 ,130 ft. Last 2 surveys project bit at 88 deg, Incl. 10:15 - 10:40 0.42 DRILL C PR001 Orient TF around to 70R. 10:40 - 12:20 1,67 DRILL C PROD1 Drilling, 1.5/1,5 bpm, 3100 - 3500 psi, TF = 80R, slow ROP after TF change at 11130 ft. Drilled to 11,150 ft, Stacking wt. Backream twice. Printed 7/10/2002 12:18:31 PM ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ) BP EXPLORATION Operations Summary Report G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Page 12öf15 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Date From;. To Hours Task Code NPT Phase Description of Operations 6/27/2002 12:20 - 15:00 2.67 DRILL C PROD1 Drilling, 1.5/1.5 bpm, 3100 - 3500 psi, TF = 100-65R, Drill with light WOB to keep out of CT lockup. Reduce pump to 1.4 bpm to get more WOB. Drilled to 11,195 ft. 15:00 - 16:15 1.25 DRILL C PROD1 Drilling, 1.5/1.5 bpm, 3100-3800 psi, TF = 75R, 90 deg incl. Drilled to 11,240 ft, 16:15 - 17:00 0,75 DRILL P PROD1 Wiper trip to window. Motor work at 10,530 ft and 10,342-10,310 ft, The rest of hole was clean. 17:00 - 19:00 2.00 DRILL P PR001 Log Tie-in with RA tag at 9626'. Added 8 ft to CTO. Lost power and depth info., re-tie-in & resubtract l' from CTO. 19:00 - 20:10 1.17 DRILL P PROD1 RBIH clean & set down with motor work @ 11150'. P/U & ream thru @ original TF till TO tagged @ 11241'. O/P on P/U. Backream to 11100' & ream down clean to TO again. 20: 10 - 23:00 2.83 DRILL P PR001 POOH driling BHA# 16. Observe motor work @ 10423'. Backream & ream down clean once. Continue POOH. Paint EOP flags @ 9400' & 7800' & POOH to surface. 23:00 - 00:00 1.00 DRILL P PROD1 LID driling BHA# 16. 6/28/2002 00:00 - 00:30 0.50 CASE P COMP PJSM & HA/HM for RIH liner completion. 00:30 - 03:30 3.00 CASE P COMP R/U, M/U & RIH 54 jts of 2-3/8" 4.7# L-80 STL with 1 P/jt, O-ring sub, float equipment & turbos. Set 2-3/8" pipe slips & pull test - OK. 03:30 - 06:45 3,25 CASE P COMP R/U 1" CSH handling tools. M/U & RIH 20' slick stick on 55 jts of 1" CSH. Land slick stick no-go on ORS & space out slick stick 4'/16' above/below the ORS. PlTest CSH x 2-3/8" annulus. 06:45 - 07:30 0.75 CASE P COMP M/U BKR CTLRT and pull test. M/U CT to running tools. BHA = 1743.3 ft. 07:30 - 09:00 1.50 CASE P COMP RIH with 2-3/8" liner on CT. Circ. at 0.4 bpm at 1700 psi. RIU to pump cement job thru in-line high pressure screen. Stop at flag, correct -14 ft CTO. Up wt at 9550 ft = 30K, Dwn wt = 19K. 09:00 - 10:40 1.67 CASE P COMP RI thru window with no wt loss. RI open hole with liner. 70 FPM, 0.3 bpm, 1800 psi. Saw small wt loss at shales at 10320, 10430, 10530 ft. Sat down full wt twice in shales at 10980 ft. Break thru on third try. RIH to 11140 ft and sat down several times. RIH to 11188 ft, sat down many times. Work thru and landed liner at TD at 11,241 ft. Circ. FloPro at 0.8 bpm, full returns. Circ. 1,1 bpm, full returns, eire, 1.3 bpm at 4000 psi, full returns. 10:40 - 13:30 2.83 CASE P COMP Insert 5/8" steel ball. Displace with FloPro. Ball on seat at 36 bbls. released from liner at 3800 psi. Pick up, Liner was free, Set down wt to 11241 ft. Displace well to 2% KCL water with friction reducer. 1.2 bpm to start, increase to 1.5 bpm with slick KCL water out shoe. Returns of 80% with KCL water across formation at 1.4 bpm. Clean rig pits and fill with KCL water. 13:30 - 15:00 1.50 CEMT N WAIT COMP Batch mix 12 bbl cement. Ran out of cement at 14 ppg. Bulk truck did not have enough dry cement on board. Dump low wt cement slurry and wait for cement bulk truck and mix water. Circ, KCL water at 1,0 bpm, 0.8 bpm returns, 15:00-15:15 0,25 CEMT P COMP SAFETY MEETING: Reviewed cementing procedure and hazards / mitigation. 15:15 - 15:30 0.25 CEMT P COMP Press test cement line with 4000 psi. OK. 15:30 - 16:40 1,17 CEMT P COMP Stage 14,7 bbls, 15,8 ppg, G Cement with latex, 1.4 bpm at 3500 psi. Printed: 7/10/2002 12:18:31 PM ) ') , / BPEXPLORATION Operations Summary Report Page 13 of 15 Legal Well Name: G-10 Common Well Name: G-10 Spud Date: 3/27/1981 Event Name: REENTER+COMPLETE Start: 6/12/2002 End: 6/30/2002 Contractor Name: NORDIC CALISTA Rig Release: 6/30/2002 Rig Name: NORDIC 1 Rig Number: From"'- To Hours Task Code NPT Phase Description. of Operations 6/28/2002 15:30 - 16:40 1.17 CEMT P CaMP Isolate reel. Flush lines. Stage 5 bbls, 2% KCL water. Stage 15 BBL FloPro. Displace with KCL water. 15 bbls displ, 1.2/1.0 bpm, 2150 psi. 23 bbls displ, 1.3 /1.0 bpm, 3250 psi. 27.9 bbls displ, Cement at shoe, zero out totalizer, 1.1 /0.6 bpm, 3650 psi, 32 bbls displ, 1,0/0,7 bpm, 4100 psi. 35 bbls, 0.8/0.7 bpm, 4070 psi, 38 bbls, 0.8/0.7 bpm, 4150 psi. 40.9 bbls, 0.7/0.65 bpm, 4230 psi. Stop pump at 40.9 bbls, 2 bbls underdisplaced. 16:40 - 18:00 1.33 CEMT P CaMP Sting out of back door flapper. Lay in 2 bbls cement inside 2-3/8" liner at 0.5 bpm, pull at 72 fpm up to 10750 ft. RIH cleaning out cement 1.2 bpm, 2500 psi, 1.2/1.1 bpm, 90% returns. Tag PBTD at 11,204 ft CTD. Circ. at 1.3 bpm at 2800 psi. Pull 500 ft. RIH and jet liner again to PBTD. POH while circ at 1.3 bpm. 18:00 - 19:20 1,33 CEMT P CaMP Jet top of liner at 9501 ft. Flag pipe at 7800' EOP. Continue POOH chasing contaminated cement out. 19:20 - 21 :00 1.67 CEMT P CaMP OOH. PJSM. LID LBRT, stand back 1" CSH & LID slick stick. Meanwhile B/O & cleanout HP inline filter. Also take-on additional 225bbls of KCL water. 21 :00 - 22:00 1.00 CEMT P CaMP M/U side jet nozzle & stab on well. Flush BOP stack. POOH nozzle & SIB injector. 22:00 - 22:45 0.75 EVAL P CaMP R/U for logging job. Meanwhile prep 120k LSRV perf pill. 22:45 - 23:00 0.25 EVAL P CaMP PJSM on P/U & RIH MCNLlGR/CCL tools & 1" CSH. 23:00 - 00:00 1.00 EVAL P CaMP P/U & RIH SWS MCNLlGR/CCL BHA#18 on 1" CSH workstring. 6/29/2002 00:00 - 00:45 0.75 EVAL P CaMP Continue RIH SWS MCNLlGR/CCL tools on 56 jts of 1" CSH workstring. BHA OAL - 1744.95', M/U injector. 00:45 - 02: 1 0 1.42 EVAL P CaMP RIH BHA#18 to 3000' & calibrate logging depth counter. Continue RIH to 9250'. 02:10 - 03:20 1.17 EVAL P CaMP Log down from 9250' to PBTO tagged @ 11208.3' @ 30fpm while pumping down perf pill @ 0.4bpm/320psi. 12' deeper @ EOP flag (did not correct). 03:20 - 04:25 1.08 EVAL P CaMP Log up from 11208.3' to 9250' @ 30fpm while laying-in perf pill @ 0.4bpm/900psi. 04:25 - 05:45 1,33 EVAL P CaMP POOH logging BHA#18 05:45 - 06:00 0.25 EVAL P CaMP PJSM for SIB 1" CSH, 06:00 - 07:00 1,00 EVAL P CaMP SIB 28 stands of 1" CSH 07:00 - 07: 15 0.25 EVAL P CaMP SAFETY MEETING, Review procedure, hazards / mitigation for recovery of SWS memory CNUGR looging tools, 07:15 - 08:00 0,75 EVAL P CaMP Layout SWS memory logging tools. Good Data. TaL @ 9501' & PBTO @ 11204', 08:00 - 09:00 1.00 PERF P CaMP Load 1.56" Power Jet perf guns in pipe shed. Total of 44 guns / blanks - 941,66', 09:00 -10:15 1.25 CEMT P CaMP Wait on cement. Cement in place at 16:40 hrs, 06/28/02, 10:15 -10:30 0,25 PERF P CaMP SAFETY MEETING. Reviewed procedure, hazards and 1.251 CEMT mitigation for running SWS 1,56" perf guns. 10:30 - 11:45 P CaMP Pressure test liner lap. Small leak, Bled from 2000-1600 psi in 20 minutes on first test and 2000-1420 psi in 30 min, on second test. Liner lap PT failed, I Printed: 7/10/2002 1218:31 PM Legal Well Name: Com mon Well Name: Event Name: Contractor Name: Rig Name: ) ') BP EXPLORATION Operations Summa-ryReport Page 14 of 15 G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Date From;;. To Hours Task Code. NPT Phase Description of Operations 6/29/2002 11 :45 - 13:30 1.75 PERF P CaMP M/U SWS 1.56" PowerJet perf guns and blanks. Loaded at 4 SPF as per program. 13:30 - 14:15 0.75 PERF P COMP M/U 31 jts, 1" CSH workstring and BKR MHA. 14:15 -16:10 1.92 PERF P COMP RIH with SWS 1.56" PJ perf guns on CT. Guns / Blanks total length = 941.66 ft. Total footage of perfs = 540 ft. BHA total length = 1894 ft. Ran thru top of liner with no wt loss, Top of 2-3/8" liner at 9501 ft. Pump 15 bbl high vis FloPro pill to spot ahead of perf ball. RIH and tagged PBTO at 11,201 ft. Corrected to 11,204 ft BKB. [+3 ft]. 16:10 - 16:40 0.50 PERF P CaMP Insert 0.50" Aluminium ball and displace with 2% KCL water. Position bottom perforating charge at 11 100 ft. Ball on seat at 34.5 bbls. Firing head sheared at 3050 psi. Pick up with no overpull. Up Wt = 27K. 16:40 - 17:30 0.83 PERF P CaMP POH with perf guns. No Fluid loss to formation. FloPro in liner. POH to 3334 ft. 17:30 - 18:00 0.50 PERF N SFAL CaMP Found leak in 2" hardline at entry point to CT reel swivel. Isolate leak. May need welded repair when CT pulled to surface. 18:00 - 19:00 1.00 PERF P CaMP POH with CT, fill 3-1/2" tbg on backside with 2% KCL water while POH. 19:00 -19:15 0,25 PERF P CaMP PJSM on LID 1" CSH. 19:15 - 20:30 1.25 PERF P CaMP LID 1" CSH, Meanwhile evaluate leaking hardline crack & decide to swap out the entire drive shaft housing @ CT reel swivel side. Mobilize spare from shop & crane. Should be able to complete swap while LID 1" CSH & perf guns. 20:30 - 20:45 0.25 PERF P CaMP PJSM with all personnel for simops on LID perf guns & swapping leaking reel hardline. Review HA/HM for planned activities & trapped pressure incident on 15-31A. Only SWS personnel to B/O guns & all non required personnel to stay clear while LID guns. 20:45 - 23:00 2.25 PERF P CaMP LID perf guns. All shots fired. Load out guns. Meanwhile swap out drive shaft housing with leaking hardline & install spare @ CT reel swivel side. 23:00 - 23:15 0.25 PERF P CaMP Fill hole with @ 2 bbls KCL water & R/U to LID remaining 1" CSH on derrick. 23:15 - 00:00 0.75 PERF P CaMP LID 1" CSH from derrick. 6/30/2002 00:00 - 01 :45 1.75 PERF P CaMP Continue LID 1" CSH from derrick. 01 :45 - 02:00 0.25 RUNCOIVP CaMP PJSM on M/U & RIH Eclipse liner top Pkr. 02:00 - 02:20 0,33 RUNCOIVP CaMP M/U Eclipse liner top Pkr with running tool & seal assy on 1 jt of 2-1/16" CSH tbg, 02:20 - 02:30 0,17 RUNCOM'>J SFAL CaMP P/test CT reel hardline to 3600psi - OK. 02:30 - 04:25 1,92 RUNCOIVP CaMP RIH Eclipse Inr top Pkr assy to 9400'. Check up wt @ 27k, RIH to ball drop position @ 9430', 04:25 - 04:55 0.50 RUNCOIVP CaMP Drop 1/2" phenolic ball. RIH & see seals going-in @ 9506'. Sting in seals with 5k slack off wt @ 9509', Pump 4bbls @ 0.6bpm/2800psi. Attempt to unsting to chase ball on seat - O/P to 43k - seems Pkr was prematurely set possibly due to debris on ball seat. Pkr is designed to set @ 2300psi differential pressure, 04:55 - 05:50 0.92 RUNCOIVP CaMP Slack back 5k @ 9507' & P/test pkr elements via annulus to 2000psi - OK. Attempt to pump ball to seat by squeezing @ 1,3bpm/3700psi. Squeeze pressure gradually decline to Printed: 7/10/2002 12:18:31 PM ) ) Pagé15 of 15 BP EXPLORATION Operations Summary Report Legal Well Name: Com mon Well Name: Event Name: Contractor Name: Rig Name: Date 6/30/2002 G-10 G-10 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 From-To Hours Task Code NPT Phase 04:55 - 05:50 0,92 RUNCOIVP CaMP 05:50 - 07:00 1,17 RUNCOIVP CaMP 07:00 - 07:15 0.25 RUNCOIVP CaMP 07:15 - 07:30 0.25 RUNCOIVP CaMP 07:30 - 09:30 2.00 RIGO P CaMP 09:30 - 09:45 0.25 RIGO P CaMP 09:45 - 11 :00 1.25 RIGO P CaMP 11 :00 - 12:30 1.50 RIGO P CaMP 12:30 - 13:00 0.50 RIGD P CaMP Start: 6/12/2002 Rig Release: 6/30/2002 Rig Number: Spud Date: 3/27/1981 End: 6/30/2002 Description of Operations 2950psi (debris on ball seat blown away). Ball on seat @ 38.6bbls away. Pressure CT to 3800psi & release running tool. Top of liner top Pkr (Tal) @ 9498'. POOH Inr top Pkr running assy. Hook-up to MeOH & start displacing to BHA. Continue POOH to 2000' Freeze protect 3-1/2" tubing with MEOH from 2000 ft to surface. POOH. layout Eclipse Packer running tools. Blow down 2" coil with N2. Pump 30,00 SCF N2 with cool down volume. Bleed off pressure in CT. Clean rig pits. SAFETY MEETING. Review procedure, hazards and mitigation for securing CT on reel for reel change out. Pull CT onto reel and secure. Change out CT pack off. Remove guide arch. Set injector in pipe bay. Change out rams in BOP stack. N/D BOPE. N/U Tree cap and pressure test. RELEASED RIG AT 13:00 HRS, 06/30/02. TOTAL TIME ON WEll WAS 13 DAYS AND 1 HOUR. Prepare rig for derrick down rig move to OS 07 -13B, Move will entail changing reels from 2" to 2-3/8" CT and modifying injecter head after the rig in on OS 7. Printed: 711012002 12: 18: 31 PM ) ) llií. BAICU. HUGHlS lNTEQ ObP BP Baker Hughes INTEQ Survey Report Company: BP Amoco Field: Prudhoe Bay Site: PB G Pad Well: G-10 Wellpath: G-10B Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NA027 (Clarke 1866) Sys Datum: Mean Sea Level Field: PB G Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0,00 ft Site: G-10 G-10 Well Position: Well: Date: 7/18/2002 Time: 14:55:42 Co-ordinate(NE) Reference: Well: G-10, True North Vertical (TVD) Reference: 15: 106/3/199500:0070,3 Section (VS) Reference: Well (0.00N,O.00E,291.00Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Page: Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 5966832,87 ft 656301.39 ft Latitude: Longitude: North Reference: Grid Convergence: 70 18 58.211 N 148 43 59.013 W True 1,19 deg Slot Name: 10 +N/-S 2220.31 ft Northing: 5969085.95 ft +E/-W 1605.07 ft Easting: 657859.77 ft Position Uncertainty: 0.00 ft Latitude: Longitude: 70 19 20.046 N 148 43 12.169 W Height 70.34 ft Well path: G-10B 500292055302 Current Datum: 15: 106/3/199500:00 Magnetic Data: 5/22/2002 Field Strength: 57505 nT Vertical Section: Depth From (TVD) ft 0.00 Survey Program for Definitive Wellpath Date: 7/18/2002 Validated: Yes Actual From To Survey ft ft 104.74 8204.74 8255.00 9620.00 9620.00 11241.00 1 : Sperry-Sun BOSS gyro multi 2 : MWO - Standard (1) MWO Annotation MD TVD ft ft 9620.00 8776.07 KOP 11241.00 9021.38 TO Survey: MWO Company: Baker Hughes INTEQ Tool: MWO,MWO - Standard Survey MD Incl Azim TVD SSTVD ft deg deg ft ft 9620,00 50.97 59,11 8776.07 8705.73 9640.74 40.61 59.00 8790.51 8720.17 9691.44 42,01 29.65 8828.96 8758.62 9721,54 36.91 14.00 8852.25 8781,91 9751,64 40,25 357,66 8875,83 8805.49 9781,61 45.44 343.77 8897.85 8827,51 9811,61 44,91 330.41 8919,05 8848,71 9843,26 50.71 318,28 8940,34 8870,00 9875,24 51.24 302,29 8960,55 8890,21 9906,09 55,72 299,65 8978,91 8908,57 9937.29 60,64 296,66 8995.36 8925,02 +N/-S ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 G-10A 9620.00 ft Mean Sea Level 26.32 deg 80.81 deg Direction deg 291.00 Version: Toolcode 2 Tool Name BOSS-GYRO MWO MWO Sperry-Sun BOSS gyro multishot MWO - Standard MWO - Standard Start Date: 6/27/2002 Engineer: Tied-to: From: Definitive Path N/S EIW MapN MapE VS DLS ft ft ft ft ft deg/10OO -1213.45 -1944.89 5967831.95 655940,98 1380.85 0.00 -1205.82 -1932.15 5967839.85 655953,55 1371.69 49.95 -1182.36 -1909.40 5967863,78 655975.80 1358.86 38,07 -1164,78 -1902.21 5967881.51 655982.62 1358.45 37.03 -1146,24 -1900.42 5967900.08 655984,02 1363.42 35.53 -1126,25 -1903,80 5967919.99 655980,21 1373,74 35.88 -1106.74 -1912,04 5967939,32 655971.57 1388.42 31,60 -1087,83 -1925,75 5967957.94 655957.47 1408,00 33,74 -1071.87 -1944,60 5967973,50 655938,29 1431.32 38.83 -1059,13 -1965.86 5967985.79 655916.77 1455,73 16,07 -1046,64 -1989,23 5967997,78 655893.14 1482,02 17,75 ) ) Bií8 ObP BP BAKM HUGMlS Baker Hughes INTEQ Survey Report INTEQ Company: BP Amoco Date: 7/18/2002 Time: 14:55:42 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: G-10, True North Site: PB G Pad Vertical (TVD) Reference: 15 : 10 6/3/1995 00:00 70.3 Well: G-10 Section (VS) Reference: Well (0.00N,O.00E,291.00Azi) Wellpath: G-10B Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS ft deg deg ft ft ft ft ft ft ft deg/100ft 9974.57 66.27 293.67 9012.01 8941.67 -1032.49 -2019.40 5968011.30 655862.68 1515.27 16.72 10006.77 71,19 293.14 9023.69 8953.35 -1020.57 -2046.93 5968022,63 655834.90 1545.24 15.36 10035.93 75.76 290.97 9031.98 8961.64 -1010.08 -2072.84 5968032.57 655808.79 1573.18 17.22 10072.76 84.64 289.80 9038.25 8967.91 -997.46 -2106.82 5968044.47 655774.55 1609.43 24.31 10104,79 90.79 289.80 9039.52 8969.18 -986.62 -2136.92 5968054.67 655744.23 1641.41 19.20 10136.52 91.41 288.22 9038,91 8968.57 -976.29 -2166,91 5968064.37 655714.03 1673.12 5.35 10169.74 93,34 284.36 9037.54 8967.20 -966.98 -2198,77 5968073.01 655681,99 1706,19 12.98 10207.57 93.87 281.02 9035.16 8964.82 -958.69 -2235.59 5968080.52 655645.00 1743.54 8.92 10240.98 93,69 274,16 9032,95 8962.61 -954,29 -2268.62 5968084,23 655611.89 1775.95 20.50 10275.24 94.66 272,58 9030.46 8960.12 -952.28 -2302.73 5968085,52 655577.75 1808.51 5.40 10305.92 94.13 269.41 9028.11 8957,77 -951.75 -2333.31 5968085.41 655547.17 1837.25 10.45 10341.21 90.59 268.81 9026.65 8956,31 -952.30 -2368,56 5968084.12 655511.94 1869,97 10.17 10374.47 90.88 263,61 9026.23 8955.89 -954.49 -2401.73 5968081.22 655478.82 1900.15 15.66 10403,71 90.97 261.15 9025.75 8955.41 -958.37 -2430,71 5968076.74 655449.93 1925.81 8.42 10437.27 90.61 257.29 9025.29 8954.95 -964.65 -2463.67 5968069.77 655417.12 1954.33 11.55 10476.84 95.62 262.38 9023.14 8952.80 -971.62 -2502.53 5968061.98 655378.41 1988.12 18.03 10511.68 96.94 266.78 9019.33 8948.99 -974.89 -2537.00 5968057.99 655344.02 2019.12 13.11 10541,54 94,92 273.28 9016.24 8945.90 -974.87 -2566,68 5968057,38 655314,35 2046,84 22.68 10571.32 92.64 276.27 9014.28 8943,94 -972.40 -2596.29 5968059.23 655284.70 2075.37 12.61 10603.47 94.48 277 .68 9012.28 8941.94 -968.50 -2628.13 5968062,46 655252,78 2106,50 7,21 10641.39 89.65 275.22 9010.91 8940.57 -964.25 -2665.78 5968065,92 655215.06 2143.16 14.29 10679.58 87.71 278.81 9011.79 8941.45 -959.59 -2703.66 5968069.78 655177.08 2180.20 10.68 10713.42 86.31 283.83 9013.56 8943,22 -952.96 -2736.79 5968075.71 655143.83 2213.50 15.38 10753.34 84.64 289.80 9016.71 8946.37 -941 .45 -2774.86 5968086.41 655105.52 2253.17 15.48 10802.37 83.32 282.25 9021.86 8951.52 -928.00 -2821.69 5968098.88 655058.43 2301.71 15.55 10831.33 86.40 280.66 9024.46 8954.12 -922.27 -2849.96 5968104.01 655030.05 2330.15 11.96 10857.71 89.82 281.89 9025,33 8954.99 -917.12 -2875.81 5968108,62 655004.10 2356.13 13.78 10892.71 87.28 276.98 9026.21 8955.87 -911.38 -2910.31 5968113.63 654969.48 2390.40 15.79 10920.61 84.99 274.52 9028.09 8957.75 -908.59 -2938.00 5968115.83 654941.74 2417.25 12.03 10954.65 86.31 274.87 9030.67 8960.33 -905.82 -2971.83 5968117.90 654907.86 2449.83 4.01 10984.50 90.44 268.90 9031.52 8961.18 -904.84 -3001.63 5968118.25 654878,05 2478,00 24.31 11016.30 90.70 265.03 9031.21 8960.87 -906.52 -3033,38 5968115,90 654846.35 2507.04 12.20 11055.50 96.33 262.57 9028.80 8958.46 -910.74 -3072.26 5968110,86 654807,57 2541.82 15.67 11090.80 97,73 259.05 9024.48 8954,14 -916,33 -3106.84 5968104,54 654773,12 2572,10 10,66 11120.80 89,56 259.05 9022.58 8952.24 -922.02 -3136.21 5968098.24 654743,88 2597.48 27.23 11152.65 91.41 263.27 9022.31 8951,97 -926,91 -3167,67 5968092,69 654712,53 2625,10 14.47 11182.40 90.44 266.44 9021.83 8951.49 -929.58 -3197,29 5968089.40 654682.97 2651.80 11.14 11241.00 90.44 266.44 9021.38 8951,04 -933.21 -3255.78 5968084.53 654624.58 2705.10 0.00 BP Amoco Parent Wellpath: Tie on MD: Rig: Ref, Datum: V,Sectlon Angle 291.00. WELLPATH DETAILS G-10B 500292055302 G-10A 9620.00 Nordic 1 15 : 10 61311995 00:00 70.34ft Origin +N/-S Origin +E/-W 0.00 Starting From TVD 0.00 0,00 REFERENCE INFORMATION Co-ordinate I,{tE¡ Reference: Well Centre: G-10. True North V'it~igtf~~ (V~\ ~~~~~~~~~: ~~t~~ ro~ggJ.6~oÕ~)el Measured Depth Reference: 15: 106/3/199500:00 70.34 Calculation Method: Minimum Curvature ANNOTATIONS lYO MD Annotation 6705.73 9620.00 KOP 6951.04 11241.00 TO 8400 8450 8500 8550 - C .- 8600 ~ 8650 - ;i8700 a. ~8750 ~8800 ~ 8850 > Ql8900 ~ 8950 ~ G.10 (G.10A)1 9000 9050 9100 9150 rw "N.'-S +£J-W St.pe fjir æ!~ fHä wi 5 ObP - -. .5 -900--= u- = ~ 8 -1O°o?- .... - --1100- .. -. :ë'-1200-= - . 1: - 0 -1300--= ~ - ::!-1400-~ .c ::: '5 -1500-= .---_. . 0 - en -1600--=: -1700-..:-- -1800-- . -1900 ::: -2000~ . Rill BISL. INTEQ T ^M 4 LEGENO - G-10.G-10B,Plan #fj - G-10 (G-10) G-10 (G-10A) - G-10B Wellpath: (G-10/G-10B) Azimuths to True North Magnetic North: 26.32' Stre~~ffi~~~~ò~~~ Dip Angle: 80.81' Date: 5/2212002 Model: BGGM2002 {{~ tZ ~:';.~I~~ Created By: Bnj Poln!s Date: 7/1812002 Contact Infonnation. Direct: (907) 267.6613 E .mail bri¡potnis@ioteQcom Baker Hughes INTEG (907) 267-6600 -400~ ---~--~ -------- -- - ~ -------- ~--_.- ----- -500~- -- - ------ ------- '-.,.--./ -600-:::---- -- - ------------ -700-=---- . - -~--------- -800-= - - -- ---<---- ------------ - -~-------------- -----~---- - "------- ~---- ------ -~- --- --- ---- -------- ------- -- ------------ --------~ ---- ----~- --------- ------.--,--~-- -------- - --- --~---- --~---- --- -~---- --~~------~ ~- ------------ -- ---- --~- -- -~------- ------- -- ------- ------- ------- .----~--------" ----~----- "----- ------- - - --- -2100-= ---'------- '_:__:-:-------'=~- -3900 -3800 -3700 -3600 -3500 -3400 -3300 -3200 -31 00 -3000 -2900 -2800 -2700 -2600 -2500 -2400 -2300 -2200 -21 00 -2000 -1900 -1800 -1700 -1600 -1500 -1400 -1300 West(-)/East(+) [100ft/in] . ----~-- -.' ---~-~---- - - - ---- - ----- ------- - _~BI -------------" - - -- ------ - - --- -- ---- -_._~--- " --- ------- - ~-----~- --~- - ---------.,--------------.------~-------- 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 195020002050 2100 215022002250 2300 2350 2400 2450 2500 2550 2600 2650 2700 2750 2800 2850 2900 2950 Vertical Section at 291.00° [50ft/in] 7/18/2002 2:511 PM :~ 11-Aug-02 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Definitive Re: Distribution of Survey Data for Well G-108 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 9,618.15 I MD Window / Kickoff Survey 9,620.00 I MD (if applicable) Projected Survey: 10,400.00 I MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager AUachment(s) RECEIVED AUG 1 ¡:. 2002 Alaska Oil & Gas Cons. C011UJÙSSk)n Anchorage dO~-I', \' - ) 0) o. ~ ~qOMS 8FL AI ,('> UQ 2 2 20æ 0 ~F.'\. ~ !'~r~V~ ~.~ ~ f ~ ¡ & ..... ,- North Slope Alaska BPXA PBU_WOA G Pad, Slot G-10 G-10B Job No. AKMW22098, Surveyed: 26 June, 2002 SUR VE Y R E PO R T 11 August, 2002 Your Ref: API 500292055302 Surface Coordinates: 5969088.00 N, 657859.00 E (70019' 20.0666" N, 148043'12.1905" W) Kelly Bushing: 70.34ft above Mean Sea Level ,- speraray-suf1 DRIL.LING sEevu::es A Halliburton Company Survey Ref: svy11265 Sperry-Sun Drilling Services . Survey Report for G-10B Your Ref: API 500292055302 Job No. AKMW22098, Surveyed: 26 June, 2002 BPXA North Slope Alaska PBU_WOA G Pad Measured Sub-Sea Vertical Local Coordinates. Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 9618.15 50.940 59.110 8704.56 8774.90 1214.15 S 1946.16 W 5967833.18 N 655938.81 E -748,36 Tie On Point MWD Magnetic 9620.00 50.969 59.110 8705.73 8776.07 1213.41 S 1944.93 W 5967833.94 N 655940.02 E 1.578 -747.87 Window Point - 9640.74 40.610 59.000 8720.17 8790.51 1205.78 S 1932.20 W 5967841.84 N 655952.59 E 49.949 -742.78 9691.44 42,010 29.650 8758.62 8828.96 1182.32 S 1909.44 W 5967865.78 N 655974.85 E 38.072 -739,86 9721.54 36.910 14.000 8781.91 8852.25 1164.74S 1902.25 W 5967883.51 N 655981.67 E 37.027 -745.33 9751.64 40.250 357.660 8805.49 8875.83 1146.20 S 1900.46 W 5967902.08 N 655983.07 E 35.532 -755.61 9781.61 45.440 343.770 8827.51 8897.85 1126.21 S 1903.85 W 5967921.99 N 655979.26 E 35.882 -770.82 9811.61 44.910 330.410 8848.71 8919.05 1106.70 S 1912.08 W 5967941.33 N 655970.62 E 31.599 -789,50 9843.26 50,710 318.280 8870.00 8940.34 1087.79 S 1925.79 W 5967959.95 N 655956.52 E 33.740 -812.05 9875,24 51,240 302.290 8890.21 8960.55 1071.83 S 1944.64 W 5967975.51 N 655937.33 E 38.828 -836.75 9906,09 55.720 299.650 8908.57 8978.91 1059.09 S 1965.90 W 5967987.80 N 655915.81 E 16,066 -861.28 9937.29 60.640 296.660 8925.02 8995.36 1046.60 S 1989.27 W 5967999.79 N 655892.18 E 17,745 -887.31 9974.57 66.270 293.670 8941.67 9012.01 1032.45 S 2019.45 W 5968013.31 N 655861.72 E 16.717 -919.66 10006.77 71.190 293.140 8953.35 9023.69 1020.53 S 2046.98 W 5968024.64 N 655833.94 E 15.356 -948,56 10035.93 75.760 290.970 8961.64 9031.98 1010.05 S 2072.88 W 5968034.58 N 655807.82 E 17,219 -975.29 10072.76 84.640 289.800 8967.91 9038.25 997.42 S 2106.87 W 5968046.48 N 655773.58 E 24.313 -1009.65 10104.79 90.790 289.800 8969.18 9039.52 986.59 S 2136.96 W 5968056.69 N 655743.26 E 19.201 -1039.86 10136.52 91.410 288.220 8968.57 9038.91 976.25 S 2166.96 W 5968066.39 N 655713.06 E 5.348 -1069.67 10169.74 93.340 284.360 8967.20 9037.54 966.94 S 2198.81 W 5968075.02 N 655681.02 E 12.982 -1100.28 .-. 10207.57 93,870 281.020 8964.82 9035.16 958.65 S 2235.64 W 5968082.54 N 655644.02 E 8,922 -1134,12 10240.98 93,690 274.160 8962.61 9032.95 954.25 S 2268.66 W 5968086.24 N 655610.91 E 20.495 -1162.55 10275.24 94,660 272.580 8960.12 9030.46 952.24 S 2302.77 W 5968087.53 N 655576.77 E 5.401 -1190,32 10305,92 94,130 269.410 8957.77 9028.11 951.71 S 2333.35 W 5968087.42 N 655546.18 E 10.446 -1214.42 10341,21 90,590 268,810 8956.31 9026.65 952.26 S 2368.60 W 5968086.13 N 655510.95 E 10,174 -1241.47 10374.47 90.880 263.610 8955.89 9026.23 954.46 S 2401.77 W 5968083.24 N 655477.83 E 15,657 -1265,87 10403.71 90.970 261.150 8955.41 9025.75 958.33 S 2430.75 W 5968078.75 N 655448.95 E 8.418 -1285.95 10437.27 90,610 257.290 8954.95 9025.29 964.61 S 2463.71 W 5968071.79 N 655416.13 E 11.551 -1307.61 10476.84 95.620 262,380 8952.80 9023.14 971.58 S 2502.57 W 5968064.00 N 655377.42 E 18.033 -1333.43 10511.68 96.940 266.780 8948.99 9019.33 974.85 S 2537.04 W 5968060.00 N 655343.03 E 13,112 -1358.16 10541.54 94.920 273.280 8945.90 9016.24 974.83 S 2566.72 W 5968059.40 N 655313.35 E 22,683 -1381.24 ---------------~----------..- --- - - --~-- -~---.--- 11 August, 2002 - 19:17 Page 2 0'4 DrillQllest 2.00,09.003 Sperry-Sun Drilling Services . Survey Report for G-10B Your Ref: API 500292055302 Job No. AKMW22098, Surveyed: 26 June, 2002 BPXA North Slope Alaska PBU_WOA G Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) ("/1 OOft) 10571.32 92.640 276.270 8943.94 9014.28 972.36 S 2596.33 W 5968061.25 N 655283.70 E 12,608 -1405.80 10603.47 94.480 277.680 8941.94 9012.28 968.46 S 2628.18 W 5968064.47 N 655251.77 E 7.205 -1433.00 10641.39 89,650 275.220 8940.57 9010.91 964.21 S 2665.82 W 5968067.93 N 655214.05 E 14.291 -1464.93 ^'- 10679.58 87.710 278.810 8941.45 9011.79 959.55 S 2703.70 W 5968071.80 N 655176.08 E 10.683 -1497.31 10713.42 86.310 283.830 8943.22 9013.56 952.92 S 2736.83 W 5968077.73 N 655142.82 E 15.381 -1527.23 10753.34 84.640 289.800 8946.37 9016.71 941.41 S 2774.91 W 5968088.43 N 655104.51 E 15.484 -1564.06 10802.37 83.320 282.250 8951.52 9021.86 927.96 S 2821.73 W 5968100.90 N 655057.41 E 15.548 -1608.92 10831.33 86.400 280.660 8954.12 9024.46 922.23 S 2850.00 W 5968106.03 N 655029.03 E 11.958 -1634.49 10857.71 89.820 281.890 8954.99 9025.33 917.08 S 2875.85 W 5968110.64 N 655003.07 E 13.776 -1657.82 Last Sperry Survey 10892.71 87.280 276.980 8955.87 9026.21 911.34 S 2910.35 W 5968115.64 N 654968.46 E 15.790 -1688.24 First Baker Survey 10920.61 84.990 274.520 8957.75 9028.09 908.55 S 2938.05 W 5968117.85 N 654940.71 E 12.031 -1711,52 10954.65 86.310 274.870 8960.33 9030.67 905.78 S 2971.87 W 5968119.91 N 654906.84 E 4.011 -1739.56 10984.50 90,440 268.900 8961.18 9031.52 904.80 S 3001.68 W 5968120.27 N 654877.02 E 24.309 -1763.33 11016.30 90,700 265,030 8960.87 9031.21 906.48 S 3033.42 W 5968117.92 N 654845.31 E 12.197 -1786.95 11055.50 96.330 262.570 8958.46 9028.80 910.70 S 3072.30 W 5968112.88 N 654806.53 E 15.668 -1814,50 11090,80 97.730 259.050 8954.14 9024.48 916.29 S 3106.88 W 5968106.56 N 654772.08 E 10,662 -1837.86 11120.80 89.560 259.050 8952.24 9022.58 921.98 S 3136.25 W 5968100.26 N 654742.84 E 27.233 -1857.11 11152.65 91.410 263.270 8951.97 9022.31 926.87 S 3167.71 W 5968094.71 N 654711.48 E 14.466 -1878.48 11182.40 90.440 266.440 8951.49 9021.83 929.54 S 3197.33 W 5968091.42 N 654681.92 E 11.142 -1899.82 11241.00 90.440 266.440 8951,04 9021.38 933.18 S 3255.82 W 5968086.55 N 654623.53 E 0.000 -1942.98 Projected Survey -"'-~ All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well Reference and calculated along an Azimuth of 129.000" (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11241.000., The Bottom Hole Displacement is 3386.91ft., in the Direction of 254.007° (True). -~----- - ----- -- ---------------- 11 August, 2002 - 19:17 Page 3 of4 DrillQlIest 2.00,09.003 North Slope Alaska Comments Measured Depth (ft) /- 9618.15 9620.00 10857.71 10892.71 11241.00 Sperry-Sun Drilling Services Survey Report for G-10B Your Ref: API 500292055302 Job No. AKMW22098, Surveyed: 26 June, 2002 Station Coordinates TVD Northlngs Eastings (ft) (ft) (ft) Comment 8774.90 1214.15 S 1946.16 W Tie On Point 8776.07 1213.41 S 1944.93 W Window Point 9025.33 917.08 S 2875.85 W Last Sperry Survey 9026.21 911.34 S 2910.35 W First Baker Survey 9021.38 933.18 S 3255.82 W Projected Survey From Measured Vertical Depth Depth (ft) (ft) 0.00 8774.90 Survey tool program fa, G-10B To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 9618.15 - 11 August, 2002 - 19:17 9618.15 11241.00 8774.90 NO Error - Unknown DEAP Error (G-10A) 9021.38 MWD Magnetic (G-10B) ---- - ------~- Page 4 of4 . BPXA PBU_WOA G Pad - ------ ----. D,mQuest 2.00.09.003 \ ~~fÆjE ]iF !Æ~!Æ~&!Æ AltASIiA OIL AND GAS CONSERVATION COMMISSION / / ¡ / TONY KNOWLES, GOVERNOR 333 W. 7TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276.7542 Mary Endacott CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Prudhoe Bay Unit G-l OB BP Exploration (Alaska), Inc. Permit No: 202-117 Surface Location: 2554' SNL, 2368' WEL, Sec. 12, TIIN, RI3E, UM Bottomhole Location: 3479' SNL, 135' WEL, Sec. 11, TIIN, RI3E, UM Dear Ms. Endacott: Enclosed is the approved application for permit to redrill t1;J.e above referenced well. The permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have.. been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Ûí&u1v~ . kul/ cam~hSli Taylor ð Chair BY ORDER OE THE COMMISSION DATED this~day of June, 2002 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation wlo encl. ALASì STATE OF ALASKA ' )OIL AND GAS CONSERVATION COLJISSION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test aa Development Oil 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool KBE = 70.34' Prudhoe Bay Field I Prudhoe 6. Property Designation Bay Pool ADL 028280 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number G-10B 9. Approximate spud date 06/12/02./ Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 11080' MD I 8955' TVDss 0 17. Anticipated pressure {s,e 20 AAC 25.035 (e) (2)} 94 Maximum surface 2244 psig, At total depth (TVO) 8800' I 3300 psig Setting Depth Top Bottom Quantitv of Cement Lenath MD TVD MD TVD (include staae data) 1580' 9500' 8695' 11080' 8955' 34 sx Class 'G' ../ v.J Q~ (;1 ILfI 0 L- A-- ~ (~ IG':¿ 1 a. Type of work 0 Drill aa Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2554' SNL, 2368' WEL, SEC. 12, T11 N, R13E, UM At top of productive interval 3883' SNL, 4501' WEL, SEC. 12, T11 N, R13E, UM At total depth 3479' SNL, 135' WEL, SEC. 11, T11 N, R13E, UM 12. Distance to nearest property line 13. Distance to nearest well J/ ADL 028285,1801' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 9600' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Casina Weiaht Grade Couplina 2-3/8" 4.6# L-80 ST-L 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 Hole 3" 19. To be completed for Redrill, Re-entry, and Deepen Òperations. Present well condition summary , Total depth: measured 11170 feet true vertical 9026 feet Effective depth: measured 11088 feet true vertical 9029 feet Length . 'Plugs (measured) 'r Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Liner Size Cemented MD TVD 110' 2685' 9182' 20" X 30" 13-3/8" 9-5/8" Cement to Surface 110' 3500 sx AS II, 20 sx Top Job 2686' 1100 sx Class 'G', 140 sx AS I 8250' 1011 sx Class 'G'R E C E , V E "4149' - 10235' 125 sx Class 'G' 1JI 01 07' - 11170' 110' 2686' 7536' 6086' 1063' 7" 4-1/2" 4079' - 9035' 9010' - 9026' true vertical 8903' - 9030' (twelve intervals) JUN 0 J 2002 Alaska OIS & Û" '. ' dv \'JUnt., vU¡¡/"",),':ë>¡OI Anchorage Perforation depth: measured 9839' - 11080' (twelve intervals) 20. Attachments aa Filing Fee 0 Property Plat aa BOP Sketch 0 Oiverter Sketch !HI Drilling Program !HI Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Mary Endacott, 564-4388 21. I hereby certify that th1fjfore o¡ng, is, ,\t~ ~~;;~r~c~t~est of m,y kn~~le" dge , Signed Mary Endacott I(¡ JJ j CU' /!/f[ffffÆfA Title CT Dnlllng Engineer uv . J ' Commission Use ,Only , Permit Number API Number APrr,p lal ~t~ See cover letter 202..- .<t:? 50- 029-20553-02 1/ I D 0/\ for other reauirements Conditions of Approval: Samples Required 0 Yes EI No Mud Log Rec.~ej 0 Yes 181 No , Hydrogen Sulfide Measures ~ Yes 0 No Directional Survey Required ~ Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU OtheC:œ}~~ k Ss 00 f'i: . by order of ~~;~o~~~~~ Rev. 12-01-85 0 R¡bifi\JA L the commission Prepared By Name/Number: Terrie Hubble, 564-4628 Date tø/3/02- Date 0 11 O,~ Subm tin -riplicate ) ) BP G-10b CTD Sidetrack Summary of Operations: A CTD through tubing sidetrack is planned for G-10a. The coil sidetrack, G-10b, will exit the 3 Y2" x 7" liner in Zone 2 and target Zone 1 B. G-1 Ob will be completed with a fully cemented 2 3/8" liner. The existing perfs will be isolated by a bridge plug and cement as described in the 10-403. / Phase 1: Prep work. Planned ASAP. 1. Wireline will punch the 3%" tubing at 9500' and 9700'. 2. Wireline will set a CIBP at 9680' and a LSX whipstock at 9600'. 3. Service coil will downsqueeze 35 bbls./of 15.8 ppg squeeze slurry to stabilize the 3%" inside the 7" liner for window milling and isolate the perfs below. The cement job will be tested to 2000 psi /' before milling the window. Phase 2: Mill window, Drill and Complete sidetrack: Planned for June 12, 2002. Drilling coil will be used to mill the two string window then drill and complete the directional hole as per attached plan. Mud Program: . Phase 1: Seawater . Phase 2: Mill with seawaterlbiozan, drill with Flo-Pro (8.6 - 8.7 ppg) / Disposal: . All drilling and completion fluids and all other Cia, II wastes will go to Grind & Inject. . All Class I wastes will go to Pad 3 for disposal. Casing Program: The production liner will be 2 3/8':ßT-L from TD to approx. 9500'MD (8695 'ss). The liner will be cemented with a minimum of 7 bbls to bring cement up to the top of the liner. A liner top packer will be used if the lap fails to test. Well Control: . BOP diagram is attached. / . Pipe rams, blind rams and the CT pack off will be pressure tes'd to 400 psi and to 3500 psi. . The annular preventer will be tested to 400 psi and 2500 psi. Directional: . See attached directional plan. Max. planned hole angle is 93 deg. / . Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging: . MWD Gamma Ray will be run in the open hole section. . Memory CNL will be run in cased hole. Hazards: / . The maximum recorded H2S on G pad offsets is <10 ppm G-14 ¡ . Zone 2 chert. Rotary briefly got stuck while drilling Zone 2 in G-10A. . Moderate risk of lost circulation at fault. . Geosteering near H.O.T. Reservoir Pressure: Reservoir pressure is estimated to be 3300 p~i at 8800'ss (7.2 ppg emw). Maximum surface pressure with gas (0.12 psi/ft) to surface is 2244 psi. j' TREE = 3-1/8" FMC W /4" QU WB..LI-EAD = McEVOY ÃCfûA""TÒR";'-'--- .. AXELSON KB. ElEV == -6if59, BF~'ECÊV ;-'''-''-------'''''-32-:27'' .....................""......""'....,,'.....''''. . ''''~ KOP = 3205' ,..".. ,........,' """" , ,,,,,..,,,,,,,,...J Max Angle == 94 @ 10939' Datum MD == 9775' bäiürn'i\ÏÖ';;;""'" ""'8'aööï"ss 13-3/8" CSG, 72#, N-80, ID = 12.347" 1-1 Minimum 10 = 2.750" @ 9727' 3-112" HES X NPPLE 1 TOPOF7" SCAB LNR 1-1 ) ----) G-10A SA FETY NOTES 8) - - 2686' ~ :8: 4149' r-¡ I 7" SCAB LNR, 29#, L-80, .371 bpf, D = 6.814" H 8064' 1 TOP OF 7' LNR H 8064' ~ 9-5/8" CSG, 47#, L-80, ID = 8.681" 1-1 3-1/2" lBG, 9.3#, L-80, 0.0087 bpf, D = 2.992" 1-1 1 TOP OF 5" LNR 1-1 7" LNR, 29#, L-80, 0.0371 bpf, ID = 6.184" 1-1 9182' 9788' 1 10107 ~ 10235' ÆRFORA TION SUMMARY REF LOG: SPffiRY SUN MWD ANGLE AT TOP PERF: 62 @ 9839' Note: Refer to Production DB for historical perf data SA= INTERVAL 0 Ft.J/SQZ DATE 6 9839 - 9844 0 01/31/01 4 9843 - 9846 0 12/24/99 6 9936 - 9956 0 11/01/01 4 10080 -10090 0 01/12/96 4 10135 -10155 0 01/02/96 4 10185-10225 0 09/20/95 4 10250 -10340 0 06/23/95 4 10368 -10400 0 06/23/95 4 10420 -10526 0 06/23/95 4 10650 -10730 0 06/23/95 4 10880 -10900 0 01/02/96 4 10964 -11080 0 06/23/95 SIZE 2-1/2" 2" 2-1/2" 2-1/Z' 2-1/2" 2-1/2" 2-3/4" 2-3/4" 2-3/4" 2-3/4" 2-3/4" 2-3/4" 2201' H 3-1/2" HES XBD SSSV LA ND NIP, ID = 2.75" 1 ~ 2604' H 9-5/8" rN PKR I GAS LIFT Mð.NæB..S ~ ST rvD TVD DEV lYÆ VLV LATa-t RJRT DATE 2 3918 3878 28 FMHO RK 1 4039 3984 30 FMHO RK L ~ 4072' I- 9-5/8" X 3-1/2" BKR SABL-3 PKR W/KBH-22 ANCHOR SEAL ASSY, 10=3.93" 4157' H 9-5/8" x 7' BA Kffi LNR PKR, ID = 6.187" I ~ ~ 8072' 1-1 9-5/8" x 7" BA KER LNR PKR, ID = 6.187" I 8255' H TOP OF CEMENT 1 9727 H 3-1/2" HESX NIP, ID =2.750" I 9740' 1- 7' X 3-1/2" BAKER SABL-3 A<R, NO ANa-tOR ASSY, ID = 3.97' I 9765' H 3-1/2" HES X NIP, ID = 2.750" I 1 9776' 1-1 3-1/2" I-ES X NIP, ID = 2.750" I 9788' - 3-1/2" TBG TAIL WLEG, D = 2.99" I 9776' ELrvD TT LOGGED 07/11/95 I 10115' l-i 7" X 5" BKR A<R, ID = 4.5" 1 9-5/8" SIDErRA CK WINOOW 8250' - 8300' 1 PBID H 11088' I 4-1/2"LNR,15#,13-8CR,0.0188bpf,D=4.283" H 11170' I DATE 04/81 06125/95 02/15/01 02/02/01 09/21/01 SIS-s I SIS-rvD RN/lP REV BY COMM:NTS ORlGIN4.L COMR...ETION SIŒTRAO< OOWlErION CONVERTED TO CANV AS FIN4.L CORRECllONS DA TE REV BY COMM:NrS 11/01/01 ON Sltlh ADD PERFS PRUDH::>E BAY LNrT WELL: G-10A PffiMT t'-b: 95-0390 AR t'-b: 50-029-20553-01 See, 12, T11 N, R13E BP Exploration (Alaska) TREE = 3-1/8" FMC W/4" QU I WELLHEAD = McEVOY I ',"W,W._,"'''''-''"'''''^'''-'--,"'''''''",'",'",''''''M'_""",",,,,'''',,w'",,,' . ACTUATOR = AXELSON : 'î(B':'''ELEV'';'''''''''''''.'''' ','," ",'" '6'5':59'" BF:-ËL8J-;"""-"'""","'''MW'_''M'''''32:27' ",w,'"w,,,,,,,',',',,,~,',-,,,',',''''',',.,','.,...,w,'.',,,,'.',,',',-.,w. ~."...\ ".",,,,',w,',"",,,--,,',,"".""'.',',', ...'........~.'...'.',.w.'.'......,.. KOP = 3205' "~ã~"~:n~"I~w,;"~,,w,,--~~~~~~~! Datum MD = 9775' 'Öãtum'''fVÖ';;'''''''''''''''''' """""'''ãäõÖ''''ss ') 13-3/8" CSG, 72#, N-80, 10 = 12.347" 1-1 2686" Minimum ID = 2.750" @ 9727' 3-1/2" HES X NIPPLE I TOP OF 7" SCAB LNR 1-1 4149" 17" Leak 100# in :30min 1-1416041871 195/8" Leak 2000psi instant loss 1-1 6072M6105 7" SCAB LNR, 29#, L-80, .371 bpf, ID = 6.814" - 8064" I TOP OF 7" LNR - 8064" 9-5/8" CSG, 47#, L-80, 10 = 8.681" 1-1 8250" I Top of 2.3/8" Liner w! Liner top packer - I Top of Cement - 9495' 9500. 1~:l1/2" I...SX Whipstock, 2,'74" window 11 9600' 1 CIBP 1-1 9700' 3-1/2" TBG, 9.3#, L-80, 0.0087 bpf, 10 = 2.992" 1-1 9788" 2" PERFORATION SUMMARY REF LOG: SPERRY SUN MWO ANGLE A T TOP PERF: 62 @ 9839' Note: Refer to Production DB for historical perf data SPF INTERV AL OPN/SQZ DA TE 6 9839 - 9844 0 01/31/01 4 9843 - 9846 0 12/24/99 6 9936 - 9956 0 11/01/01 4 10080 -10090 0 01112/96 4 10135 -10155 0 01/02/96 4 10185 -10225 0 09/20/95 4 10250 -10340 0 06/23/95 4 10368 -10400 0 06/23/95 4 10420 -10526 0 06/23/95 4 10650 -10730 0 06/23/95 4 10880 -10900 0 01/02/96 4 10964 -11080 0 06/23/95 SIZE 2-1/2" 2-1/2" 2-1/2" 2-1/2" 2-1/2" 2-3/4" 2-3/4" 2-3/4" 2-3/4" 2-3/4" 2-3/4" r PBTD - 11088" 4-1/2" LNR, 12.6#, L-80, NSCT, ID = 4.283" 11170" G-10B Proposed CTD Sidetrack 8 S/ '}Y NOTES 2201" 1-1 3-1/2" HES XBO SSSV LAND NIP, 10 = 2.75" I ~ 2604" 1-1 9-5/8" DV PKR I - - r-JI :8: t--l j 1- L :8: DATE REV BY COMMENTS DATE REV BY COMMENTS 04/81 ORIGINAL COMPLETION 11/01/01 CWS/tlh ADD ÆRFS 06/25/95 SIDETRACK COMPLETION 05/31/02 MSE PROPOSED CT ST 02/15/01 515-151 CONVERTED TO CANVAS 02/02/01 SIS-MD FINAL 09/21/01 RNITP CORRECTIONS J i 1-1 I >'"' ," 1/ I r",,,,,:,",:nn:~n' : 1\ 8. r~ 1:,,:~. . ::,/ .ç . ~; ',¡ ::''':: ;, -;' ~ 1 ~-:.::;::,:,[~I ;:':.~Ù~ ;;;,~:,,"', ~':¡2L;:.~',:~~~ (;;~:,;~:;~:{~~-':'~ ; ~ GAS LIFT MANDRELS ~ ST MO ìVD DEV TYÆ VLV LATCH PORT DATE 2 3918 3878 28 FMHO RK 1 4039 3984 30 FMHO RK 4072" 1- 9-5/8" X 3-1/2" BKR SABL-3 PKR W/KBH-22 ANCHOR SEAL ASSY, ID = 3.93" 4157" 1-1 9-5/8" x 7" BAKER LNR PKR, 10 = 6.187" I 8072" 1-1 9-5/8" x 7" BAKER LNR PKR, 10 = 6.187" I 9-5/8" SIDETRACK WINDOW 8250' - 8300' I .2 3..'ß" Cem~l1te."j ,311d p(:rfëd liner / 1-1 11080' 1 '~I~'~'~:':::::~~,--~:~~-=::J 9727' 9740" - 3-1/2" HES X NIP, ID = 2,750" I - 7" X 3-1/2" BAKER SABL-3 PKR. NO ANCHOR ASSY 10 = 3.97" - 3-1/2" HES X NIP, ID = 2,750" - 3-1/2" HES X NIP, ID = 2.750" - 3-1/2" TBG TAIL WLEG, 10 = 2,99" I 9765" 9776" 9788" 10107" 1-1 TOP OF LNR 1 10115" 1-1 7" X 5" BKR PKR. 10 = 4.5" I 7" LNR. 29#, L-80. NSCC, 0.0371 \-1 I bpf, 10 = 6.184" I 10235" PRUDHOE BA Y UNrr WELL: G-10B ÆRMrr No: API No: 50-029-20553-02 Sec. 12,T11N,R13E BP Exploration (Alaska) BP Amoco 0.... bp . INTEQ - ... BAKIR- IRIGHIS LEGEND - 6010 (6010) -- - 6010 (6oIOA) - Plan156010B - P1an15 T AM ¿ Magnetic Field Strength: 57505nT Dip Angle: 80,81" Date: 221055/2002 Model: BGGM2001 Contact Information: "--J:.'h.~ WIILLPATH II8I'AlLS ..... .. ..,.. __U82 G-18A - Azimuths to True North Plan: Plan #5 (G-1DlPlan #5 G-1OB) Magnetic North: 26,32° Created By: James ohfinger Date: 31/05512002 Direct: (907) 267-6610 E-mail: james.oh~nger@inteq.oom Baker Hughes INTEQ: (907) 267-6600 .... ....- v....- .... ......' e... e... ~ e... tI.,e 8l1li... - 'e.utl = = REFERENCE INFORMATION Co-ordlnate (NIE! Reference: Well Centre: G-10. TNe North v~~g ~:,~;~:: ~r~~Ó roe~~~el Measured Dapth Reference: 15: 1061311995 00:00 70.34 Calculation MethGd: Minimum CUNature ... - ... I =::::: ~ , ...... AM .... : =¡¡::g t11S . ....... _n "'7. T .........n ...". e__- . i~ -- ...... "8"81'" 81.81 ør.T.8 tt.- --.. "8'-- -..a ..... ~:~== :::: 1m: ..I........ -.a M&.M ..81""'" .... 18&81 .8'lIOII 88TAIU IV8 - - == :1:t.:: :=:ft ...... .......... ......... :=: ~= ~== ""78 "'11"M .........7. mt: :tr.= ~=:f ...... 4It.7."""" --.,. --... 4tM- M87.M - -ata... == :::::me: ==== ""'"8 -8ZL8I ......... - W8C8 =:: ..:= .... - &aI _AI ..&::: tC -.- ==.: ..... - !!:...= ~t:: -:: ..... _eo - T"", .-.. ....... .cn.a !5 =:: ma.a\ == ..,.... ==: -... - C ~ -900 ----- !. -. ~A- TW IID- 88201.78 - n...- _,e -... 1001....- _.78 ..,.... , 87..... -... . 87- -... . =... ,_., . n ,".... . _.sa ,_... a ..- ,_... , ..11M ,_... . ....... ,_... e -.. ,- ,. ,,_.. ft TARGET DETALS No... tVO +NI-S +£J.JN ~ g::~~ .g~ ::H~~:: ~ 0-.011 TZ _.01 -814.32 .2228.88 - 0-'011 TI _.01 -1114.311 -1887.08 -- 8350 j 8400~ 8450l ~ - ..: C 855O-j i~ 81) ..: - ' oI:æro-J .. ' 18700 =1 a : 'i 8750 d U ~ ~ 8800 d . ; >~ . e 89QO-j - þoo .~ G-iO(G-1QA) 8950j ~ .~ - - -==,~L _n¡:!J__~ ,[1] fIJ JI ---I ---.:::t=j-'- -,-- - _l--.~ --- -- -- - --' -1G-10B-:;I'-- -í6oIOBT2I----- l!J -L- I [ill I I IPl8nI5. G-10Bj I ---- ~f601OBT3r--- 9050 j 9100 :; --_.---- -i [ ¡ i ; i ii,; '!:.' : ! I I : ! J ! I;. ¡ : J , ! ~ ; ; : ¡ ! ¡ ¡ ¡ j ¡ ¡ I r ¡ ¡ , : ¡ , . : ¡ ; ! r ¡ !! ¡ ¡ j ¡ ¡ ¡ ! ¡ ¡ ;, ¡¡! ¡ ;' ¡ : ; ¡! ¡ ¡ ¡ ¡ ¡ ¡ ! f ; j ¡ J ~ ¡ ¡ : i ..!!;! , 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000 2050 2100 2150 2200 2250 2300 2350 2400 2450 2500 2550 2600 2650 2700 2750 2800 2850 2900 2950 3000 3050 3100 Vertical Section at 289.00° [50ft/in) ) - INTEQ" , , ) Baker Hughes INTEQ I Baker Hughes INTEQ Planning Report AnDotation MD ft 9494.34 9600.00 9610.00 9630.00 9680.00 10093.01 10159.00 10239.00 10289.00 ,:'(', :, \:::'1 G-10B Polygon -Polygon 1 -Polygon 2 -Polygon 3 -Polygon 4 -Polygon 5 -Polygon 6 G-10B T3 70.34 ~938.13 -2069.90 5968104.5ß 655810,21 70,1910.817N 1,484412:571, W 70.34 ;,,938.13 ~2069.9Ø 5968104;~6655810.21 70 1910:817, N 148 44 12;571'W 70.34 :-113P;40 ~2444.01 S967904.48" 655440.25 70 19 8;925 N 148 ,44 23.486 W 70.34 -1041.36 -3357.42 5961974.28 654525;24 70 19 9.797N 1484450.141 W 70.34 -796.39 -3352.32 5968219.29 6$4525J 8 70 19 12.206 N 148 44 49.995 W 70;34 -736.19 -2880.93 5968289.38 654995.17 70 19 12.800 N 148 ,44 36.240 W 70.34 -791.28 -2156.87 5968249.54 655720.18 70 19 12.261 N 148 44 15.110 W 9025.34 -897.24 -3279.60 5968120.00 654600.00 70 19 11.215 N 148 44 47.872 W 9025.34 -914.32 -2229.66 5968125.00 655650.00 70 19 11.051 N 148 44 17.233 W 9035.34 -794.39 -1987.06 5968250.00 655890.00 70 19 12.231 N 148 44 10.155 W G-10B T2 G-10B T1 TVD ft 8695.13 8763.44 8770.04 8784.24 8820.66 9035.34 9033.06 9027.58 9025.87 Tie in Position Kick off Point 1 2 3 4 5 6 7 ) Baker Hughes INTEQ ) Baker Hughes INTEQ Planning Report ~. INTÈQ' ':2" :, Survey . Ml)" ';, i I~~I" 111'1 . , Jt::, ,"'døSJ,:", 9494.34 48.25 9500.00 48.46 9525.44 49.40 9556.50 49.96 9587.17 50.57 9600.00 50.72 58.74 53~36 MOO 9610.00 46.72 58.74 180.00 MWD 9625.00 43.72 58.74 180;00 MWD 9630.00 42.72 58.74 180.00 MWD 9640.00 42.78 54.91 270.00 MWD 9660.00 43.29 47.32 8735.88 -1197.98 -1923.44 5967847.87 655962.10 26.00 1428.62 272.81 MWD 9680.00 44.29 39.95 8750.32 -1187.97 -1913.91 5967858.07 655971.41 26.00 1422.87 278.36 MWD 9700.00 42.84 32.69 8764.82 -1176.89 -1905.74 5967869.32 655979.34 26.00 1418.76 251.28 MWD 9720.00 41.88 25.11 8779.61 -1165.12 -1899.23 5967881.23 655985.60 26.00 1416.44 256.54 MWD 9740.00 41.43 17.31 8794.57 -1152.74 -1894.43 5967893.70 655990.14 26.00 1415.92 262.15 MWD 9760.00 41.52 9.46 8809.56 -1139.88 -1891.37 5967906.63 655992.93 26.00 1417.22 267.98 MWD 9780.00 42.13 1.71 8824.47 -1126.63 -1890.08 5967919.90 655993.94 26.00 1420.31 273.87 MWD 9800.00 43.25 354.22 8839.18 -1113.09 -1890.57 5967933.42 655993.17 26.00 1425.18 279.65 MWD 9820.00 44.83 347.09 8853.57 -1099.40 -1892.84 5967947.07 655990.61 26.00 1431.78 285.16 MWD 9840.00 46.84 340.40 8867.51 -1085.64 -1896.86 5967960.73 655986.30 26.00 1440.07 290.29 MWD 9860.00 49.20 334.17 8880.89 -1071.95 -1902.61 5967974.30 655980.26 26.00 1449.96 294.95 MWD 9880.00 51.88 328.39 8893.61 -1058.42 -1910.04 5967987.66 655972.55 26.00 1461.39 299.12 MWD 9900.00 54.82 323.04 8905.55 -1045.18 -1919.08 5968000.71 655963.23 26.00 1474.25 302.80 MWD 9920.00 57.98 318.08 8916.62 -1032.34 -1929.67 5968013.33 655952.38 26.00 1488.44 305.99 MWD 9940.00 61.32 313.46 8926.73 -1019.98 -1941.71 5968025.43 655940.08 26.00 1503.85 308.74 MWD 9960.00 64.80 309.13 8935.79 -1008.23 -1955.11 5968036.90 655926.44 26.00 1520.34 311.08 MWD 9980.00 68.41 305.04 8943.74 -997.17 -1969.75 5968047.64 655911.57 26.00 1537.79 313.04 MWD 10000.00 72.11 301.16 8950.50 -986.90 -1985.52 5968057.58 655895.60 26.00 1556.04 314.66 MWD 10015.96 75.11 298.18 8955.00 -979.33 -1998.82 5968064.87 655882.14 26.00 1571.08 315.98 G-10B , bp ) ~) , Baker Hughes INTEQ , Baker Hughes INTEQ Planning Report . INTEQ" , Survey MD ft 10020.00 297.44 8956.01 -977.51 -2002.28 5968066.62 655878.64 26.00 1574.95 ,~16.82 MWD 10040.00 79.71 293.83 8960.24 -969.06 -2019.90 '5968074.70 655860.85 /26.00 1594.36 317.00 MWD 10060.00 83.57 290.32 8$63.15 -961.62 -2038;23 ' ~9~80$~J~4 655842.37 26;00 ,1614.11 317..77 "MVVD 1 0080.00 87.46 286.,86 8964.71 ~955.27', ,-2Q57~12 5968087.69 $QS823:35 26.ØO 1634.Q.4' 318.28 MWD 10093.01 90.00 284.62 8965.00 ':'951.74 ':'2069.64, 5~.0$0:96 ' 6558tO.76' ' ~6J)0 "1647;O~, ,31~t55," MWÐ 10100.00 90.42 283.89 8964.97 .. ..950.02 -2076:41 5~a092.54 , 655åÓ3.Ö5' 12~QO, 1653.99' ;300;00 MWP ' 10125.00 91.92 281.29 8964;46 :'944.57 -2100:80 ,5968097.47 " '655779.45, 12.00 1678.83 300.00 MWD 10150.00 93:41 278.69 '8963.30 '-94.0.~4 ..2125~39 59ß610t28 ',655"l54:1~ 12.00 ' ,1703,~49, '299.94 MWD 10159.00 93.95 217.75 8962.72 ..938¡96 -2134.28 S96ð1Q2.3~ ' 655745.86 12:00 11712.31 ' ,299:82 'MWD' 10175.00 93.95 275.83 8961.62 ~937.07 -2150:13 5968103.93 655729:98 12.00 ,1727.91', ',' 270.00 MWD 10200.00 93.94 272.82 8959.90 -935.19 -2175.00 5968105~29 655705.08 12.00 1752;03 2ß9:a? MVVO: 10225:00 93.91 269.81 8958.19 ,;,934.62 ':'2199:93 " 5968105:34 655680.t4' , 12.00, 1715.79 , 269.66' MOO 10239.00 93:89 268.,13 8957:24 ' -934;87' ':'2213:90 59~104;7~ '655668.19, 12.00 1188.92' 269.45 MWD 10250.00 93.05' 267,.12 '8956.57 :'935.32 -2224:87 5968104.11 655655:23 12.00 1799:14 230.00 MWD 10275.00 91.11 264,.82, 8955.67 -937.08 -2249:79 598a1 01:83 655630.3~ "12.00 1822.1 ~ 229.9~ 'MVVO 10289.00 90.03 263.54 8955.53 -938.50 -2263.71 5~8100j2 65561,6.46 '12.00 1834.83 ' 2,29.86 ,MVVD 10300.00 90.03 264.86 8955.52 ':939.61 -2274:66 ' ,5ØAAQ~Ø;?ii , ~56Q5.55, ' ~2.0a ~S+1.~2 90.09 ,MOO' 10325.00 90.03 267.86 8955.~1 ;'941;20 ~2299~60' ' 5$680~6.66 ,'6S~580.$4 12.00 1867.89 90,00' MV'$ 10350.00 90.03 270.86 8955.4,9 ' "941.48 .;2324:60 5968095.85' , 65~555;66" 12.00 1891;43 90:do MWD 10375:00 90:03 273.86 8955.48' ' "940~45' -2349.57:' 5Q6S096:36 655530~67," 1'2.00 '1915.38 90,;00', MWO'" 1 0400.00 90;03 276.86 8955.47 ,.938.12 -2374,46 596$098.16, 655~O5~74¡' 12.00 1939.61 ,90.01 ,'MVVÐ I 10425.00 90.03 279.86 8955.46 .;934.49 -2~9,9~ 19 59~1 C>1.28 655480.94 12.00 1964.24 "90:01 MOO 10439.00 90.03 281.54 8955.45 -931.89 , -2~':2.9~ ' 5968103.58 ',eq~~;13 '12.0a 1978.99 " 90.q1 MWO 10450.00' '90.03 280.22 8955.44 ' -929.81 -2423; 75 5968105:43' 65~5ES.29 12~OO '19S8~98,1' 270;00 "'MOO, 10475.00 90.03 277.22 8955.43 -926.03 -2448.46 5$68108.7Ð 655431.51 12.00 2013.58 270;00 MVVD 10500.00 90.03 274.22 8955.42 -923.54 -2473.33 5968110.67 655406.59 12.00 2037.91 270,.00 MOO 10525.00 90.03 271.22 8955.41 -922.35 ':'2498.30 5968111.32 655381.60 '12.00 2061~9() 270.00 MOO 10550.00 90.03 268.22 8955.40 -922.48 -2523.30 5968110.67 655356.62' 12.00 2085.50 269.99 MOO 10575.00 90.03 265.22 8955:38 -923.91 -2548.25 5968108.72 655331.70' 12.00 2108.63 269.99 MOO 10600.00 90.03 262.22 8955.37 -926.64 -2573~10, 5968105.46 655306.91 12.00 2131.23 269.99 MOO 10625.00 90.03 259.22 8955.36 -930.68 ,;,2597.77 5968100:91 655282.34 12.00 2153.24 269.99 MOO 10639.00 90.03 257.54 8955.36 -933.50 -2611.48 5968097.80 655268.69 12.00 2165.29 269.99 MOO 10650.00 90.03 258.86 8955.35 -935.75 -2622.25 5968095.33 655257.97 12.00 2174.74 90.00 MWD 10675.00 90.03 261.86 8955.34 -939.94 -2646.89 5968090.62 655233.42 12.00 2196.68 90.00 MWD 10700.00 90.03 264.86 8955.33 -942.83 -2671.72 5968087.21 655208.66 12;00 2219.21 90.00 MWD 10725.00 90.03 267.86 8955.32 -944.42 -2696.67 5968085.09 655183.76 12.00 2242.28 90.00 MWD 10750.00 90.02 270.86 8955.31 -944.70 -2721.67 5968084.29 655158.77 12.00 2265.82 90.00 MWD 10775.00 90.02 273.86 8955.30 -943.67 -2746.64 5968084.79 655133.78 12.00 2289.77 90.01 MWD 10800.00 90.02 276.86 8955.28 -941.34 -2771.53 5968086.60 655108.85 12.00 2314.06 90.01 MWD 10825.00 90.02 279.86 8955.27 -937.70 -2796.26 5968089.71 655084.05 12.00 2338.63 90.01 MWD 10850.00 90.02 282.86 8955.26 -932.78 -2820.77 5968094.12 655059.45 12.00 2363.41 90.01 MWD 10864.00 90.02 284.54 8955.26 -929.47 -2834.37 5968097.14 655045.78 12.00 2377.34 90.01 MWD 10875.00 90.02 283.22 8955.25 -926.83 -2845.05 5968099.56 655035.05 12.00 2388.30 270.00 MWD 10900.00 90.02 280.22 8955.24 -921.75 -2869.53 5968104.12 655010.47 12.00 2413.10 270.00 MWD 10925.00 90.02 277.22 8955.23 -917.97 -2894.23 5968107.38 654985.69 12.00 2437.69 270.00 MWD 10950.00 90.02 274.22 8955.22 -915.48 -2919.11 5968109.35 654960.77 12.00 2462.02 270.00 MWD 10975.00 90.02 271.22 8955.21 -914.29 -2944.08 5968110.01 654935.79 12.00 2486.02 270.00 MWD 11000.00 90.02 268.22 8955.21 -914.42 -2969.07 5968109.36 654910.80 12.00 2509.61 269.99 MWD 11025.00 90.02 265.22 895520 -915.85 -2994.03 5968107.40 654885.88 12.00 2532.74 269.99 MWD 11050.00 90.02 26222 8955.19 -918.58 -3018.88 5968104.14 654861.10 12.00 2555.34 269.99 MOO 11075.00 90.02 259.22 8955.18 -922.62 -3043.55 5968099.59 654836.52 12.00 2577.36 269.99 MOO 11080.00 90.02 258.62 8955.18 -923.58 -3048.45 5968098.53 654831.64 12.00 2581.68 269.99 MOO , ,1," ::"':::':::I';:,:I~~~.~,'~fi~~~~'~~tWi,}:;:I.~r, ;~i~~~~~:~~3~:i;'I¡'?'i:':~1~e~":::::q;,: ",,~';' ',,' ",I," i'" " :~: :'î:i: 'Î,~=,' "" 'jIÀI"'~~:::':','~,':',',':,',""",'" "',' ',',"" ',1$""1'Q'Øt31f9é6'PO'QO"70'3, ",,1\ ',,' ,,"" '."\ ,,', .:,,"~',' , . ".'. .'...:,.i..~¡~;i"i,\*JI~~~~"'~~'.. Comp...y: ,'BPAmoco,' ' , Field: " '..' "" Prudh~p8y , Site: PBGPad, .' , "'eU: G..1:0 ',.'.",", , , Wëllpa.b; ,Plan #5<3-108 ' , ,I,' ') All Measurements are from top of Riser ~ Q) en .- cr: top of bag ~.~ '1".I'"lll~' 1, ~:j"'T I I bttm of bag middle of slips Blind/Shears middle of pipes 211 combi ram/slips ~ middle of flow cross Mud Cross ~ middle of blind/shears 2 3/811 ram middle of pipe/slips 211 combi ram/slips Flow Tee ",.,...,.,....." .~.-..-.-.~.~... r- "---' ") 5/31/2002 BAG TOTs /' Mud Cross .".,",.,....". TOTs / _....-.-.~..-/- H 206712 DATE INVOICE I CREDIT MEMO 040902 CK040902N PYMT COMMENTS: HANDL:NG INST: DESCRIPTION PERMIT TO DRILL FEE S/H - TERRIE HUBBLE RECEIVED JUN 0 3 2002 Alaska ou &- (ja~ LOII~. lJOIlIl11t&5'OI1 Anchorage WeLL.:¡T r;.../ 0./5 THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 PAY To The ORDER O-f TOTAL ~ DATE 04/ii/02 CHECK NO. ----.-.- üü¿ü.~ / 1 ¿ GROSS iOO.OO VENDOR DISCOUNT ALASKAOILA NET 100.00 X4628 G- \0 {) 100.001 100. 00 FIRST NATIONAL BANK OF ASHLAND AN AFFlUATE OF NATIONAL CITY BANK CLEVELAND. OHIO No. H 208712 CONSOLIDATED COMMERCIAL ACCOUNT 56-389 41'2" 00206712 ONE HUNDRED & 00/100************************************* US DOLLAR ALASKA OIL AND GAS CONSERVATION COMMISSION 333 WEST 7TH AVENUE SUITE 100 ANCHORAGE AK 99501 DATE 04iili02 AMOUNT $100.00 NOT VALID AFTER 120 DAYS . r1"~~-' " '1 \( j1{!;/lU~ f ~ . .' . . (: ~.,. ¡l..4V . ' ~~, ..-' :, --dr )P ,~ III 2 0 b ? ~ 2 III I: 0 L. ~ 2 0 3 8 9 5 t: 0 0 B L. L. ~ 9 III .°-.. 00 H -- CHECK 1 ST ANDARD LETTER DEVELOPMENT DEVELOPMENT REDRILL v EXPLORA TION INJECTION WELL INJECTION WELL REDRILL Rev: 5/6/02 C\jody\templates ) ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME AIf 4 C - /¿J-ð CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) PILOT HOLE (PH) "CL UE" The permit is for a new wellbore segment of existing well --' Permit No, API No. Production should continue to be reported as a function of the original API number stated above. In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). ANNULAR DISPOSAL Please note that an disposal of fluids generated. . . INTO ANNULUS OF ANOTHER WELL ON SAME PAD L-) SPACING EXCEPTION Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) will assume the liability of any protest to the spacing exception that may occur. WELL PERMIT CHECKLIST COMPANY,,¡If/,)é WELL NAME~q f':-/óS FIELD & POOL hf/C'/5/J INIT CLASS O~ /-ø>"/ ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . 3. Unique well name and number. .. . . . . . . . . . . . . . . . 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . 5. Well located proper distance from drilling unit boundary. . . . 6. Well located proper distance from other wells.. . . . . . . . . 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . 9. Operator only affected party.. . . . . . . . . . . . . . . . . . 10. Operator has appropriate bond in force. . . . . . . . . . . . . 11. Permit can be issued without conservation order. . . . . . . . ~PR .!?~:.E/ 12. Permit can be issued without administrative approval.. . . . . ð//- t;V9/ð¿ 13. Can permit be approved before 15-day wait.. . . . . . . . . . ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . 15. Surface casing protects all known USDWs. . . . . . . . . . . 16. CMT vol adequate to circulate on conductor & surf csg. . . . . 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . 18. CMT will cover all known productive horizons. . . . . . . . . . 19. Casing designs adequate for C, T, B & permafrost. . . . . . . 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 21. If a re-drill, has a 10-403 for abandonment been approved. . . 22. Adequate well bore separation proposed.. . . . . . . . . .-. . 23. If diverter required, does it meet regulations. . . . . . . . . . 24, Drilling fluid program schematic & equip list adequate. . . . . 25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . 26. BOPE press rating appropriate; test to 3500 psig. 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . 28. Work will occur without operation shutdown. . . . . . . . . . . 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . 30. Permit can be issued wlo hydrogen sulfide measures. . . . . jrY@ 31. Data presented on potential overpressure zones. . . . . . . Y N 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y AßP~ ~AIE 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . N /fré: £'/Ç/~ 34. Contact name/phone for weekly progress reports [exploratory 0 1 Y N ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; . . . . . . . (B) will not contaminate freshwater; or cause drilling waste. .. to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from pool; and (E) will not circumvent 20 AAC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION: RPc¡ffc APP.R DA T~ VJ~A- &/4{ 02- h-~ ~r;,--.c d- GEOLOGY APPR DATE ~r¿ ~'d,¿ PROGRAM: Exp - Dev.A. Redrll.x.. Serv - Wellbore seg - Ann. disposal para req - GEOL AREA r;??d UNIT# // C, 5' Co ON/OFF SHORE (1 Jt J ~N Y N Yj N Y¡ N Y N Y N Y N Y N U: ~ Y N N Ê¡J/k- ,._~-N- ~ ~ Á~'jtLÆ~te 8)éœs ~ . t§ì N CTI)Ú- . *Q~ N ¡..I1it- N N N M. ~ P 2- 2- t/£/ f f t" . N ~ ( þ.~. ( \J0OS¥L \-0 ~ ~ ~ cA>:c- Commentsllnstructions: JDH WGA W6rA- &9--1,,\ ~r(; .:a::>- COT I / DTS 06¡06 o~ G:\geology\permits\checklist.doc ) ) . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. . To improve the readability of the Well History file and to simpltfy finding information, information of this nature is accumulated at the end of the file under APPEN.DIX. No special' effort has been made to chronologically organize this category of information. ) Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Mon Feb 24 08:57:33 2003 Reel Header Service name. . . . . . . . . . . . .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 03 /02/24 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... .UNKNOWN Comments................ .STS LIS ) ¿Xoa-/II / /5/lj Writing Library. Scientific Technical Services Tape Header Service name. . . . . . . . . . . . .LISTPE Date.................... .03/02/24 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 5 AK-MW-22098 C. ZAWADZKI C. SEVICK/G. JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 8 AK-MW-22098 B. JAHN G. SARBER / JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 11 AK-MW-22098 B. JAHN G. SARBER / # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: G-10B 500292055302 BP Amoco Sperry-Sun Drilling Services 24-FEB-03 MWDRUN 6 AK-MW-22098 B. JAHN G. SARBER / MWDRUN 9 AK-MW-22098 B. JAHN G. SARBER / 12 11N 13E 2554 MWDRUN 7 AK-MW-22098 B. JAHN G. SARBER / MWD RUN 10 AK-MW-22098 B. JAHN G. SARBER / ) ) FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 2368 MSL 0) 70.34 36.99 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 2.750 3.500 9620.0 # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA (TVDSS) . 3. MWD RUNS 1 - 11 COMPRISED DIRECTIONAL WITH NATURAL GAMMA RAY (PC G) UTILIZING SCINTILLATION DETECTORS. MWD RUNS 1 - 4 INVOLVED IN SETTING THE WHIPSTOCK AND MILLING THE WINDOW. NO DATA FOR THESE RUNS ARE PRESENTED. THE TOP OF THE WHIPSTOCK WAS POSITIONED AT 9620'MD. 4. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED-HOLE GAMMA RAY LOG RUN IN G-10B ON 29 JUNE 2002. THESE PDC DATA WERE PROVIDED BY D. SCHNORR (BP) ON 10/14/02. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. 5. MWD RUNS 1 - 11 REPRESENT SPERRY-SUN DRILLING SERVICES' (SSDS) PORTION OF WELL G-10B WITH API#: 50-029-20553-02. THIS WELL SECTION REACHED A TOTAL DEPTH (TD) OF 10944'MD/8956'TVDSS. AT THIS DEPTH SSDS WAS REPLACED BY BAKER HUGHES INTEQ. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED NATURAL GAMMA RAY. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type......... . . . . . . .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and 1 clipped curves; all bit runs merged. DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP $ ) ) .5000 START DEPTH 9603.5 9630.0 STOP DEPTH 10914.0 10941.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ----- BASELINE 9603.5 9608.0 9616.5 9620.5 9624.5 9647.0 9651.5 9656.5 9664.0 9667.0 9680.5 9694.5 9700.0 9707.0 9715.5 9741.5 9758.5 9764.5 9779.5 9788.5 9792.5 9796.0 9802.0 9809.5 9837.5 9844.5 9857.0 9860.5 9870.5 9874.5 9889.0 9896.0 9907.0 9914.5 9918.5 9931.0 9944.0 9947.5 9952.5 9956.0 9957.5 9964.0 9970.0 9973.5 9978.0 9979.5 9992.0 10000.0 10003.5 10007.0 10024.5 10028.5 10045.5 DEPTH GR 9607.0 9611.5 9619.0 9622.5 9626.5 9649.0 9653.5 9659.0 9666.5 9669.0 9683.0 9697.0 9703.0 9709.5 9718.0 9744.0 9761.0 9767.0 9780.0 9789.5 9793.0 9797.5 9803.0 9810.5 9836.0 9845.0 9858.0 9862.0 9871.5 9874.5 9889.5 9896.5 9907.5 9915.5 9921.0 9930.5 9943.0 9947.0 9952.5 9956.0 9957.0 9962.5 9970.5 9973.5 9978.0 9980.5 9990.5 9999.0 10002.5 10006.0 10024.0 10028.0 10045.5 , ) ,.) 10052.0 10052.0 10057.0 10058.0 10075.5 10079.5 10083.5 10088.0 10089.0 10094.5 10091.0 10097.0 10122.0 10127.5 10124.5 10130.0 10164.5 10169.5 10177.5 10183.5 10189.0 10192.5 10216.0 10219.0 10221.0 10225.0 10265.0 10267.5 10282.5 10284.0 10286.5 10287.5 10291.0 10292.5 10306.5 10310.0 10317.0 10319.0 10321.0 10321.5 10330.5 10329.5 10348.5 10347.5 10350.5 10349.5 10356.5 10356.5 10366.0 10367.0 10400.0 10400.5 10401.5 10402.0 10402.5 10403.5 10415.5 10417.5 10431.5 10432.5 10445.0 10446.5 10453.5 10455.0 10463.0 10465.0 10468.0 10472.0 10519.5 10521.5 10538.0 10539.0 10547.0 10549.0 10558.5 10559.0 10571.0 10572.0 10575.5 10576.0 10581.0 10582.0 10592.0 10593.0 10595.0 10597.0 10598.0 10602.0 10599.0 10603.0 10629.0 10633.0 10640.5 10644.5 10658.5 10661.5 10676.5 10680.0 10706.5 10709.0 10715.5 10718.5 10723.0 10725.0 10728.5 10731.0 10740.5 10742.5 10749.0 10751.5 10752.0 10755.0 10759.5 10761.5 10771.0 10773.5 10776.0 10778.0 10787.5 10789.5 10793.5 10795.5 10797.5 10800.0 10813.5 10817.0 10835.5 10838.0 10838.5 10840.0 ) ) 10841.0 10843.0 10850.0 10851.5 10854.0 10858.5 10865.5 10871.0 10880.5 10883.5 10893.5 10895.5 10899.5 10905.5 10911.0 10941.0 $ 10842.0 10844.0 10851.0 10852.0 10855.0 10859.0 10865.0 10871.0 10883.5 10885.0 10892.5 10894.5 10901.5 10905.5 10914.0 10943.5 # MERGED DATA PBU TOOL MWD MWD MWD MWD MWD MWD MWD $ SOURCE CODE BIT RUN NO 5 6 7 8 9 10 11 MERGE TOP 9607.0 9679.0 9801.0 9886.0 9902.0 10060.5 10107.5 MERGE BASE 9679.0 9801.0 9886.0 9902.0 10060.5 10107.5 10943.5 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9603.5 10941 10272.3 2676 9603.5 10941 ROP MWD FT/H 0.03 2531.65 81.8927 2623 9630 10941 GR MWD API 11.4 357.84 59.3025 2622 9603.5 10914 First Reading For Entire File......... .9603.5 Last Reading For Entire File.......... .10941 File Trailer Service name.......... ...STSLIB.001 Service Sub Level Name... ) Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.002 physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9607.0 ROP 9632.0 $ 2 ) header data for each bit run in separate files. 5 .5000 STOP DEPTH 9651.0 9679.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 21-JUN-02 Insite 3.3 Memory 9679.0 9605.0 9679.0 51.0 51.0 TOOL NUMBER 16 2.750 9620.0 KCl Biozan 8.60 7.0 17000 2.0 .000 .0 ) ) MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: .000 .000 .000 .0 .0 .0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9607 9679 9643 145 9607 9679 ROP MWD050 FT/H 0.73 51.34 28.0246 95 9632 9679 GR MWD050 API 11.4 73.34 26.7782 89 9607 9651 First Reading For Entire File......... .9607 Last Reading For Entire File.......... .9679 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type................LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..03/02/24 Maximum Physical Record. .65535 File Type.... . . . . . . . . . . . . LO ) Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 3 ) header data for each bit run in separate files. 6 .5000 START DEPTH 9651.5 9679.5 STOP DEPTH 9774.0 9801.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O 22-JUN-02 Insite 3.3 Memory 9801.0 9679.0 9801.0 39.0 51.0 TOOL NUMBER 15 2.750 9620.0 LSND 8.60 5.0 7.0 17000 2.0 .000 .000 .000 .000 .0 145.9 .0 .0 ) ) Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9651.5 9801 9726.25 300 9651.5 9801 ROP MWD060 FT/H 0.28 35.44 18.2441 244 9679.5 9801 GR MWD060 API 20.01 164.11 33.012 246 9651.5 9774 First Reading For Entire File......... .9651.5 Last Reading For Entire File.......... .9801 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9774.5 ROP 9801.5 $ 4 header data for each bit run in separate files. 7 .5000 STOP DEPTH 9859.0 9886.0 # LOG HEADER DATA ) DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) 23-JUN-02 Insite 3.3 Memory 9886.0 9801.0 9886.0 44.9 50.7 TOOL NUMBER 15 2.750 9620.0 Flo Pro 8.60 9.0 21000 8.8 .000 .000 .000 .000 .0 150.1 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 ) ) First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9774.5 9886 9830.25 224 9774.5 9886 ROP MWD070 FT/H 0.03 24.32 5.86926 170 9801.5 9886 GR MWD070 API 19.11 95.07 29.9703 170 9774.5 9859 First Reading For Entire File......... .9774.5 Last Reading For Entire File.......... .9886 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type................LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9859.5 ROP 9886.5 $ 5 header data for each bit run in separate files. 8 .5000 STOP DEPTH 9876.0 9902.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 23-JUN-02 Insite 3.3 Memory 9903.0 9886.0 9903.0 51.2 51.2 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray $ TOOL NUMBER 16 ') # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) 2.750 9620.0 Flo Pro 8.60 9.0 21000 9.2 .000 .000 .000 .000 .0 150.1 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD080 FT/H 4 1 68 4 2 GR MWD080 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9859.5 9902 9880.75 86 9859.5 9902 ROP MWD080 FT/H 0.05 13.55 4.49078 32 9886.5 9902 GR MWD080 API 16.26 80.97 30.9178 34 9859.5 9876 First Reading For Entire File......... .9859.5 Last Reading For Entire File.......... .9902 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 ) File Type................LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 6 ) header data for each bit run in separate files. 9 .5000 START DEPTH 9876.5 9902.5 STOP DEPTH 10033.5 10060.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 23-JUN-02 Insite 3.3 Memory 10060.0 9903.0 10060.0 55.7 71.2 TOOL NUMBER 16 2.750 9620.0 Flo-Pro 8.60 8.8 20000 8.0 .000 .000 .000 .000 .0 154.3 .0 .0 ) ) # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD090 FT/H 4 1 68 4 2 GR MWD090 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9876.5 10060.5 9968.5 369 9876.5 10060.5 ROP MWD090 FT/H 1.6 120.94 68.8007 317 9902.5 10060.5 GR MWD090 API 21.69 311.25 53.9083 315 9876.5 10033.5 First Reading For Entire File......... .9876.5 Last Reading For Entire File.......... .10060.5 File Trailer Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Next File Name.......... .STSLIB.007 Physical EOF File Header Service name............ .STSLIB.007 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.006 Comment Record ') FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 7 ) header data for each bit run in separate files. 10 .5000 START DEPTH 10034.0 10061.0 STOP DEPTH 10085.5 10107.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet 24-JUN-02 Insite 3.3 Memory 10107.0 10060.0 10107.0 84.6 84.6 TOOL NUMBER 16 2.750 9620.0 Flo-Pro 8.60 9.2 20000 6.8 .000 .000 .000 .000 .0 154.3 .0 .0 ') ) Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD100 FT/H 4 1 68 4 2 GR MWD100 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10034 10107.5 10070.8 148 10034 10107.5 ROP MWD100 FT/H 3.95 129.75 87.3942 94 10061 10107.5 GR MWD100 API 42.42 127.02 65.4086 104 10034 10085.5 First Reading For Entire File......... .10034 Last Reading For Entire File.......... .10107.5 File Trailer Service name............ .STSLIB.007 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type................ LO Next File Name.......... .STSLIB.008 Physical EOF File Header Service name............ .STSLIB.008 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.007 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10086.0 ROP 10108.0 $ 8 header data for each bit run in separate files. 11 .5000 STOP DEPTH 10917.0 10943.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE 26-JUN-02 VERSION: Insite ) DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCG Natural gamma ray $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 3.3 Memory 10944.0 10107.0 10944.0 83.3 96.9 TOOL NUMBER 16 2.750 9620.0 Flo-Pro 8.60 9.0 22000 9.2 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD110 FT/H 4 1 68 4 2 GR MWD110 API 4 1 68 8 3 Name Service Unit DEPT FT Min 10086 Max 10943.5 Mean Nsam 10514.8 1716 ) .0 167.0 .0 .0 First Reading 10086 Last Reading 10943.5 ) ') ROP MWDll0 FT/H GR MWDll0 API 0.93 29.5 2531.65 357.84 106.201 1672 69.9624 1663 10108 10086 10943.5 10917 First Reading For Entire File......... .10086 Last Reading For Entire File.......... .10943.5 File Trailer Service name............ .STSLIB.008 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .03/02/24 Maximum Physical Record. .65535 File Type................LO Next File Name.......... .STSLIB.009 Physical EOF Tape Trailer Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/02/24 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/02/24 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File ) ) a o~.;. / J7 1/7/7 **** REEL HEADER **** RWD 03/05/05 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** RWD 03/05/04 319114 01 TINY TRAK" CTK *** LIS COMMENT RECORD *** ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! -Version Information VERSo WRAP. -Well Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 9590.0000: STOP.FT 11241.0000: STEP.FT 0.5000: NULL. -999.2500: COMPo COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCAT I ON : CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API. API NUMBER: -Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- Remark File Version 1.000 Extract File: ldwg.las 1. 20: NO: CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ------------------------------- Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska), Inc. G-I0B Prudhoe Bay Unit 70 deg 19' 20.046"N 148 deg 43' 12.169"W North Slope Alaska Baker Hughes INTEQ TINY-TRAK 27-Jun-02 500292055302 ------------------------------- Description SECT. TOWN.N RANG. PDAT. EPD .F LMF . FAPD.F DMF EKE .F EDF .F EGL .F CASE.F OSl OS2 . 12 IlN 13E MSL 0 DF 70.34 DF NA 70.34 N/A 10235 DIRECTIONAL NA Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 Other Services Line 2 ') ) -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) Logging data from 9593' MD (8689' SSTVD) to 10917' MD (8957' SSTVD) was provided by Sperry Sun Drilling Services. The data from 10917 to TD is memory data. (4) Well G-10B is a sidetrack of the original well G-10, kicked off at 9620' MD (8706' SSTVD). (5) Baker Hughes INTEQ run 1 utilized TINY TRAK with Gamma services from 10917' MD (8957' SSTVD) to 11241' MD (8951' SSTVD). (6) The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) curve supplied by BP (SWS, 29-06-2002). (7) The depth from 11241' MD (8951' SSTVD) to 11223' MD (8951' SSTVD) was not logged due to sensor to bit offset. MNEMONICS: GRAM -> Gamma Ray MWD-API [MWD] (MWD-API units) ROPS -> Rate of Penetration, feet/hour SENSOR OFFSETS: RUN GAMMA 1 18.40 ft. CURVE SHIFT DATA OBSERVED, ACTUAL, DISPLACEMENT 9626.14, 9623.98, ! -2.16113 9658.86, 9656.22, ! -2.6416 9696.59, 9694.19, ! -2.40234 9792.68, 9791.72, ! -0.960938 9802.77, 9800.85, ! -1.9209 9861.9, 9860.46, ! -1.44043 9943.16, 9945.57, ! 2.40137 9980.83, 9979.39, ! -1.44141 10006, 10006.8, ! 0.719727 10027.8, 10028.5, ! 0.720703 10051.9, 10051.4, ! -0.480469 10096.8, 10091.3, ! -5.52344 10103.4, 10097.6, ! -5.76367 10287.2, 10286.5, ! -0.720703 10307.6, 10304, ! -3.60254 10356.1, 10356.1, ! 0 10446.4, 10445.2, ! -1.20117 10540.2, 10539.5, ! -0.720703 10585.6, 10582.7, ! -2.88184 10718.8, 10715.2, ! -3.60254 10731.3, 10727.9, ! -3.36133 10739.7, 10737.6, ! -2.16113 10742.4, 10740.4, ! -1.92188 10752, 10748.8, ! -3.12207 10755.1, 10751.7, ! -3.3623 10761.8, 10759.6, ! -2.16113 10769.5, 10765.2, ! -4.32227 10773.6, 10771.2, ! -2.40137 10842.4, 10841.2, ! -1.20117 10852.7, 10851.5, ! -1.20117 10858.9, 10858, ! -0.960938 10944.5, 10943.1, -1.44141 10956.8, 10955.8, -0.959961 10964, 10962.3, -1.68066 10999.7, 10996.9, -2.88184 11039.5, 11037.1, -2.40234 11104.3, 11103.6, -0.720703 11140.3, 11142, 1.68066 EOZ END DIRECTIONAL 23.38 ft. Tape Subfile: 1 103 records... Minimum record length: 10 bytes ) ,) Maximum record length: 132 bytes **** FILE HEADER **** RWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------------- WDFN LCC CN WN FN COUN STAT mwd.xtf 150 BP Exploration (Alaska), Inc. G-10B Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** !! !!!!! !!! ! !!! !! ! !! Remark File Version 1.000 1. The data presented has been edited from the field raw data. 2. The data has been depth shifted to match the PDC supplied by BPX. 3. The PDC used is a Schlumberger Gamma Ray dated 29-Jun-02. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP GR ROP ---------------------------------------------------- GR ROP GRAM 0 2 ROPS02 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: One depth per frame (value= 0) Datum Specification Block Sub-type is: 84 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 2 68 68 4 4 4 4 1 1 API F/HR GR ROP MWD MWD ------- 8 ) ) Total Data Records: 40 Tape File Start Depth Tape File End Depth Tape File Level Spacing = Tape File Depth Units = feet 9590.000000 11241. 000000 0.500000 **** FILE TRAILER **** Tape Subfile: 2 49 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** FILE HEADER **** RWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN LCC CN WN FN COUN STAT mwd.xtf 150 BP Exploration (Alaska), G-I0B Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** ! ! !!! ! !! ! !! !!!! ! !!! Remark File Version 1.000 The data contains the unedited field raw data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GRAM ROPS GRAM ROPS GRAM ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: One depth per frame (value= 0) Datum Specification Block Sub-type is: 84 1 FRAME SPACE = 0.500 * F ) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 2 GRAM MWD ROPS MWD 68 68 1 1 API F/HR 4 4 4 4 ------- 8 Total Data Records: 40 Tape File Start Depth Tape File End Depth Tape File Level Spacing = Tape File Depth Units = feet 9590.000000 11241. 000000 0.500000 **** FILE TRAILER **** Tape Subfile: 3 49 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** TAPE TRAILER **** RWD 03/05/04 319114 01 **** REEL TRAILER **** RWD 03/05/05 BHI 01 Tape Subfile: 4 2 records... Minimum record length: Maximum record length: 132 bytes 132 bytes J ) Tape Sub file 1 is type: LIS )' Tape Subfile 2 is type: LIS DEPTH 9590.0000 9590.5000 9600.0000 9650.0000 9700.0000 9750.0000 9800.0000 9850.0000 9900.0000 9950.0000 10000.0000 10050.0000 10100.0000 10150.0000 10200.0000 10250.0000 10300.0000 10350.0000 10400.0000 10450.0000 10500.0000 10550.0000 10600.0000 10650.0000 10700.0000 10750.0000 10800.0000 10850.0000 10900.0000 10950.0000 11000.0000 11050.0000 11100.0000 11150.0000 11200.0000 11241. 0000 GR -999.2500 -999.2500 14.0085 35.0242 35.5361 25.5064 51.2877 19.2051 28.8592 90.3179 39.8508 69.7472 147.6338 57.2791 41.6476 45.3715 105.5345 66.0234 74.9958 42.9552 52.8286 31.7726 46.2924 32.4674 40.8400 130.8214 46.5585 63.7104 117.0352 148.4908 59.7299 54.4688 101. 0116 107.6577 92.5783 -999.2500 ) ROP -999.2500 -999.2500 -999.2500 38.3971 32.2801 19.8255 2.4048 7.1140 6.0262 48.8515 95.9705 86.1268 124.4454 97.5560 112.0329 119.9941 152.7364 135.6304 48.0203 58.6828 145.9089 501. 0748 90.2857 148.1660 109.5190 35.0483 90.7672 92.2148 62.1030 44.0222 37.3959 83.1959 44.3840 80.6748 53.5333 -999.2500 Tape File Start Depth Tape File End Depth Tape File Level Spacing = Tape File Depth Units = feet 9590.000000 11241.000000 0.500000 " Tape Subfile 3 is type: LIS DEPTH 9590.0000 9590.5000 9600.0000 9650.0000 9700.0000 9750.0000 9800.0000 9850.0000 9900.0000 9950.0000 10000.0000 10050.0000 10100.0000 10150.0000 10200.0000 10250.0000 10300.0000 10350.0000 10400.0000 10450.0000 10500.0000 10550.0000 10600.0000 10650.0000 10700.0000 10750.0000 10800.0000 10850.0000 10900.0000 10950.0000 11000.0000 11050.0000 11100.0000 11150.0000 11200.0000 11241. 0000 GRAM -999.2500 -999.2500 13.8400 23.0900 71.5600 26.8400 22.4200 23.2200 30.0300 62.3300 39.6800 66.6500 263.4500 57.8000 46.8900 43.3400 74.6900 62.1800 71. 4100 41.3500 54.3200 34.9800 53.4400 31.2400 40.9000 148.5500 59.3700 60.7400 112.1300 143.1650 73.1960 54.7710 90.8190 107.0850 88.6190 -999.2500 ) ROPS -999.2500 -999.2500 -999.2500 41.5600 14.5000 23.2600 1.4100 1.1700 1.5800 23.0800 95.5800 101.8600 107.9900 84.4500 151.3500 118.0200 163.2100 134.5600 85.8000 89.6900 144.2200 232.2900 76.3700 135.4300 112.1400 151.6700 93.9900 91.5000 5.7100 45.7960 41. 7580 11.3370 61.8720 16.7560 53.2870 -999.2500 Tape File Start Depth Tape File End Depth Tape File Level Spacing = Tape File Depth Units = feet 9590.000000 11241.000000 0.500000 ) ) Tape Subfile 4 is type: LIS