Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-117
) )
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
J O.Q - 1 L 1 Well History File Identifier
0 Two-sided 1111111111111111111
Organizing (done)
~escan Needed 1111111111111111111
RESCAN
~olor Items:
~reYSCale Items:'.-
0 Poor Quality Originals:
DIGITAL DATA
~Diskettes, No. J--
0 Other, No/Type:
OVERSIZED (Scannable)
0 Maps:
0 Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
0 Other:
0 Logs of various kinds:
BY:
0 Other:: ,
Date: '3, J Ó, tJ Lf 151 VV1 P ~
1111111111111111111 . d
Date£6 /ó 64' 151 1M P . ~ ~
(:
+ IS- 'f TOTAL PAGES 75"" ~~
Date:e ¡ 0 () If 151 ¡ýYJ P z..
Production Scanning 1II1I111I111111111
Page Count from Scanned File: I' (;; CÆ-Jc.fl/vI ~ et..&.~
Page Count Matches Number in Sc~nning Preparation: V YES NO
Date:~,'~4: Ot- I~ Vl-1 fJ
YES NO
Helen ~
NOTES:
Project Proofing
BY:
Helen ~
Scanning Preparation
BY: Helen ~
~~
x 30 = (0 ()
Stage 1
Stage 1
Helen e~
If NO in stage 1 page(s) discrepancies were found:
BY:
BY:
Helen Maria
Date:
151
Scanning is complete at this point unless rescanning is required.
ReScanned
1I11II III II
BY:
Helen Maria
Date:
151
Comments about this file:
Quality Checked
1111111111111111111
8/9/2004 Well History File Cover Page.doc
· STATE OF ALASKA I
ALAS~IL AND GAS CONSERVATION COM SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Alaska Oil & Gas Cons. Commission
RECEIVED
JUL 1 4 2006
A
1a. Well Status: DOil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class: """"VI "1:1"
20AAC 25.105 20AAC 25.110 181 Development D Exploratory
DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 4/7/2006 202-117 306-029
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 6/21/2002 50-029-20553-02-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 6/27/2002 PBU G-10B
2554' FNL, 2368' FEL, SEC. 12, T11N, R13E, UM 8. KB Elevation (ft): 15. Field 1 Pool(s):
Top of Productive Horizon:
3613' FNL, 4334' FEL, SEC. 12, T11N, R13E, UM 70.34' Prudhoe Bay Field 1 Prudhoe Bay
Total Depth: 9. Plug Back Depth (MD+ TVD) Pool
3487' FNL, 345' FEL, SEC. 11, T11 N, R13E, UM 11204 + 9022 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 657858 y- 5969087 Zone- ASP4 11241 + 9021 Ft ADL 028280
TPI: x- 655916 y- 5967987 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 654622 y- 5968086 Zone- ASP4 NIA MD
DYes 181 No 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey NIA MSL 1900' (Approx.)
21. Logs Run:
MWD, GR, ROP, Memory CNL, CCL
22. CASING, LINER AND CEMENTING RECORD
¢~SING ... ,". .. SETTING DEPTHiMD SËTTlNG DEPTH TVD HOLE "', ...
...... "\MU\l~1
} ·"SIZE.· Wr. PER FT. GRADE Top BOTTOM SIZE ,.' / POLLED,
Top BOTTOM '..',.....
20" x 30" Insulated Conductor Surface 110' Surface 110' 36" Cement to Surface
13-3/8" 72# L-80 Surface 2686' Surface 2686' 17-112" 3500 sx AS II 20 sx Too Job
9-5/8" 47# L-80 Surface 9620' Surface 8776' 12-1/4" 1100 sx Class 'G' 140 sx AS I
7" 29# L-80 4149' 9620' 4079' 8776' 8-1/2" 1011 sx Class 'G'
2-3/8" 4.6# L-80 9498' 11241 ' 8698' 9021' 3" 72 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 124. .. ~ .." ·i...
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
None 3-1/2",9.3#, L-80 xxx' 4072'
MD TVD MD TVD
125. '" ACID,r' r".. ...... ".,. Erc. > i'. ......,.,'
.. ,-,"'VI"'" /' ?, ......'
'~C \N'\V"'- 'U1 :¡ 1":' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
"> ,';-.~J )t:tJ,j L {-Jr' r) 9485' Set CIBP
9468' Set Whipstock
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production NIA
Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-Bsl CHOKE SIZE I GAS-Oil RATIO
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED Oll-Bsl GAs-McF WATER-Bsl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE'"
27. <. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
None RBDMS BFl ,iUL 1 7 2006
Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE
OR\G\NAL
6
28.
GEOLOGIC MARKE
29.
ORMATION TESTS
NAME
MD
TVD
Include and brie y summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
23SB
9650'
8798'
None
25N
9695'
8832'
21TS 1 Zone 2A
9795'
8907'
Zone 1 B
9905'
8978'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Terrie Hubble 4 . Title Technical Assistant
Date D 7 ~ "3 fora
PBU G-108
Well Number
202-117 306-029
Permit NO.1 A roval No.
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubble, 564-4628
Ted Stagg, 564-4694
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
.
.
G-10B
Prudhoe Bay Unit
50-029-20553-03
206-009
Accept:
Spud:
Release:
Ri:
PRE-RIG WORK
01/06/06
DRIFTED WI 1.75" CENT, UNABLE TO WORK THRU TIGHT SPOT AT 9600' SLM, LOST JAR ACTION. SET 3.5
KEYLESS X LOCK CATCHER AT 9468' SLM. TRIED MULTIPLE TIMES TO PULL STA #2 AT 3885' SLM. KEPT
SLIPPING OFF WI ONE OJ LICK. GOT IMPRESSION OF RK LATCH WI LIB. GOT ONE PIECE OF FN ON JD
DOGS. DIDN'T GET VALVE. SUGGEST USING DANIELS NEXT TIME. PULLED EMPTY 3.5 KEYLESS X LOCK
CATCHER FROM 9468' SLM. RAN PDS CALIPER FROM 9461' SLM TO SURFACE.
01/29/06
DRIFTED WI 2.70" MODIFIED DUMMY WHIPSTOCK TO 9486' SLM (TOL), SAMPLE BAILER EMPTY.
01/30/06
PULLED 1.5" OGLV FROM STA#2 AT 3892' SLM. LRS PUMPED FULL VOLUME DOWN IA. SET 1.5" DUMMY
VALVE - RK LATCH AT 3892' SLM. MITX IA TO 3000 PSI, FAILED, MIT X OA PASSED AFTER 3RD ATIEMPT
RIH TO CONFIRM STA #1, #2 VALVES WERE FULLY IN THE POCKET. GOOD INDICATIONS ON BOTH
STATIONS LRS MIT X IA TO 3000 PSI AGAIN, FAILED.
02110/06
SET 3 1/2" C-SUB AT 9486' SLM. PULL 1 1/2" RK-DGLV FROM STA 1. PULLED 1 1/2 RK-DUMMY FROM
STATION #2 SET DUMMY VALVES WI EX1.PACKING IN STATION #1, #2. PULLED EMPTY C-SUB.
02125/06
LOGGED SCMT FROM 8500' TO 9550'. TOP OF CEMENT FOUND AT 9152'. NO PROBLEMS RIH OR POOH.
WPP COMPLETION MAPPER RUN FROM 9495' - 8500'. FOUND TUBING CLOSE TO HIGH SIDE OF PIPE
OVER MAJORITY OF LOGGING INTERVAL, DUE TO HIGH DOGLEGS HOLDING IT UP.
04/07/06
SET WEATHERFORD CIBP IN 3.5" LINER AT 9485 FT. TAPPED PLUG - GOOD. FINAL T/l/O 01120010. WELL
LEFT SI.
05/19/06
SET WFD 3-1/2" LSX WHIPSTOCK. TOP OF WHIPSTOCK AT 9470' ORIENTED 7 DEGREES LEFT OF HIGH
SIDE. CORRELATED TO SWS SCMT 25 FEB 06. 2 PIP TAGS LOCATED AT 9475.7'. TAGGED AFTER SET.
BP EXPL ION
Operations Summary Report
Page 1 _
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 6/1/2006
Rig Release: 6/17/2006
Rig Number: N1
Spud Date: 3/27/1981
End: 6/17/2006
Dale From - To Hours Täsk Code NPT Phase Description of Operations
6/4/2006 15:30 - 16:30 1.00 RIGD P PRE Rig released from C-04B @ 15:30Hrs on 6/4/2006. Prep to
move rig off well.
16:30 - 19:30 3.00 MOB N RREP PRE Jack up rig & observe control line hose to front booster leaking
with ca. 1 TSP leak of hydraulic oil onto pad. Fetch new hose &
replace control line. Test new control line - OK. Meanwhile C/O
injector gripper blocks.
19:30 - 19:45 0.25 MOB P PRE PJSM for moving rig off well.
19:45 - 20:00 0.25 MOB P PRE Jack-up rig & pull rig off well. Conduct post-operations pad
inspection.
20:00 - 20:15 0.25 MOB P PRE Held pre-move safety meeting with crew, security & tool
services.
20:15 - 00:00 3.75 MOB P PRE Move rig from C-pad to G-pad. Meanwhile C/O injector gripper
blocks.
6/5/2006 01 :00 - 01 :15 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for backing rig
over well.
01 :15 - 01 :30 0.25 MOB P PRE Back rig over well & set down. ACCEPT RIG AT 01 :30 HRS
ON 06/05/2006.
01 :30 - 01 :45 0.25 BOPSU P PRE PJSM for N/U BOPE.
01 :45 - 03:30 1.75 BOPSU P PRE N/U BOPE.
03:30 - 10:00 6.50 BOPSU P PRE Perform initial BOPE pressure / function test. AOGCC witness
waived by Chuck Scheve. BOPE testing witnessed by BP
WSLs. Meanwhile spot outside trailers & tanks. R/U hardline to
CT reel.
10:00 - 13:00 3.00 RIGU P PRE Held PJSM on stabbing CT, R/U cable and pulley, P/U injector
I head, Slip grapple into CT & pull test. Pull CT over pipe shed
with winch & stab into injector, M/U injector to stripper, set back
Inj
13:00 - 13:15 0.25 RIGU P PRE Weld on CTC, Pull test CTC.
13:15 - 14:45 1.50 RIGU P PRE RU dart catcher sub, pump 8bbls thru surface lines to coil with
Biozan KCL water, Press test inner reel valve and hardline to
4000psi, Fill CT wI biozan, install dart, eire, dart on seat at 39.4
bbls. RD catcher sub, RU, PIT weld-on CTC, Open well. Well
was dead.
14:45 - 15:15 0.50 STWHIP P WEXIT PJSM on PU and handling BHA and Pre- Spud Mtg
15:15 - 15:30 0.25 STWHIP P WEXIT M/U BHA #1,2.74" Pilot hole mill wI string mill, WFD 2 3/8"
PDM, 2 Jts of 21/16" CSH tbg, WFD MHA. OAL = 76.74'
15:30 - 18:15 2.7.5 STWHIP P WEXIT RIH with Milling Assy #1, dry tagged 9485', set dn w/1 K, S/O
Wt 18 K, PU Wt 31 K, PU to 9475', circ w/ 1.5 bpm, 1000 psi,
RIH to pinch point at 9483.9', mtr stalled, S/O Wt 19.9 K, Up
Wt 28 K, second tag at 9483', mtr stalled.
18:15 - 18:30 0.25 STWHIP P WEXIT PUH 15', circ & establish free spin @ 1.55bpm/1020psi. RBIH
& ease in till motor work @ 9482.8'. Correct CTD to 9470'. Flag
pipe & start milling window with 2ppb bio-KCL fluid.
18:30 - 21:30 3.00 STWHIP P WEXIT Stall4x @ 9470.1'. Ease in & mill from 9470' to 9471' with
1.55/1.55bpm, 1020/1250psi & 2-3k WOB.
21:30 - 23:00 1.50 STWHIP P WEXIT Mill to 9472' with 1.55/1.55bpm, 1 020/1300psi & 4k WOB.
23:00 - 00:00 1.00 STWHIP P WEXIT Mill to 9472.4' with 1.55/1.55bpm, 1020/1500psi & 5k WOB.
6/6/2006 00:00 - 01 :00 1.00 STWHIP P WEXIT Continue milling to 9473' with 1.55/1.55bpm, 1 020/1500psi &
5k WOB.
01 :00 - 02:00 1.00 STWHIP P WEXfT Mill to 9474' with 1.55/1.55bpm, 1150/1450psi & 5k WOB.
02:00 - 04:00 2.00 STWHIP P WEXIT Mill to 9475' with 1.55/1.55bpm, 1250/1550psi & 6k WOB.
04:00 - 05:45 1.75 STWHIP P WEXIT Mill to 9476' with 1.55/1.55bpm, 1300/1600psi & 5k WOB.
05:45 - 07:45 2.00 STWHIP P WEXIT Paint EOP flag @ 9000' & POOH window milling BHA #1.
Printed: 612012006 12: 16:55 PM
BP EXPLORATION
Operations Summary Report
Page 2 _
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 6/1/2006
Rig Release: 6/17/2006
Rig Number: N1
Spud Date: 3/27/1981
End: 6/17/2006
Date From - To Hours Task Code NPT Phase Description of Operations
6/6/2006 07:45 - 08:00 0.25 STWHIP P WEXIT POH LD 2.74" Pilot Milling Assy # 1. DWM gauage 2.74" go I
2.73" no-go & DSM gauge 2.74" no-go.
08:00 - 09: 15 1.25 STWHIP P WEXIT PU 2.74" Milling Assy #2 wI WFD 2.74" mill, 2.5 deg mtr,
Dir-Gr-Orientor, MHA, weld-on CTC
09:15 - 11 :45 2.50 STWHIP P WEXIT RIH wI Milling Assy #2, shallow hole test MWD/orientor at
3310', slight bobble thru GLM at 3920', set dn on GLM at 4056',
cycled orientor, TF at 45L, RIH to 4077' wI .22 bpm, tagged up,
worked past 4077' wI .22 bpm, RIH, correct depth -15' at EOP,
RIH tagged dry at 9473', Up Wt 29.5K, Dn Wt 17.7K, PU, TF
@ 14 L, pump rate 1.43bpm, 1824 psi, s/o TF rolled to 2 L, mtr
work at 9472.8'
11 :45 - 12:00 0.25 STWHIP P WEXIT Milling thru 3 1/2" window fl 9472.8 to 9474.3 wI 1.51 bpm at
2100, FS 1820 psi, PVT 169 bbls
12:00 - 12:45 0.75 STWHIP P WEXIT Mill to 9476' with 25L TF, 1.55/1.55bpm, 2000/2150psi & 8k
WOB.
12:45 - 13:45 1.00 STWHIP P WEXIT Mill to 9477' with 15L TF, 1.55/1.55bpm, 2000/2150psi & 7k
WOB.
13:45 - 14:30 0.75 STWHIP P WEXIT Control mill to 9478' with 8L TF, 1.55/1.55bpm, 2000/2150psi &
6k WOB.
14:30 - 15:15 0.75 STWHIP P WEXIT Control mill to 9480' with 8L TF, 1.55/1.55bpm, 2000/2150psi &
6k WOB. Exit into formation @ 9480'.
15:15 -16:45 1.50 STWHIP P WEXIT Control mill formation to 9486' with 1.55/1.55bpm,
2000/2150psi, 6k WOB & 6fph ave ROP. Meanwhile swap the
wellbore to 60% new/40% reconditioned 8.5ppg Flo-Pro mud
with 3% L-T & 8ppb K-G.
16:45 - 17:45 1.00 DRILL P WEXIT Short wiper to 9450'. Window looks clean. RBIH & establish
freespin @ 1.55bpm/3200psi. Geo confirms formation in BU
samples.
17:45-18:10 0.42 DRILL P WEXIT Control mill to 9490' with 2L TF, 1.55/1.55bpm, 3200/3500psi,
7k WOB & 8fph ave ROP
18:10-19:00 0.83 DRILL P WEXIT Backream/dress window/rat hole 3x & drift 2x. Tentative
window depths are: TOWSfTOW = 9470', BOW = 9480', RA
PIP Tag = 9476'. Reamed 3 times and dry tagged at 9,488 ft
twice.
19:00 - 20:45 1.75 DRILL P WEXIT POOH and conducted shallow hole test on orientor at 3,500 ft
(OK)
20:45 - 22:20 1.58 DRILL P PROD1 Handle BHA, Mill at 2.74" No/Go. LD window exit BHA and PU
1.1 deg BHI motor and HYC 2.70· x 3" BC bit.
Offset at 14deg in I 69 deg out
22:20 - 00:00 1.67 DRILL P PROD1 Set counters and RIH. SHT at 3,500 ft (OK)
6nt2006 00:00 - 01 :00 1.00 DRILL P PROD1 RIH and corrected + 17 ft to the window flag.
Tied in from 9,270 ft to 9,340 ft (Upper Zone IV)
Added 6 ft correction
01 :00 - 01 :20 0.33 DRILL P PROD1 Orient TF to HS above WS
With 1 deg LOHS, RIH and dry tagged bottom at 9,490 ft.
Up wt 25k and 18k down
01 :20 - 01 :45 0.42 DRILL P PROD1 Orient TF to 30 to 45 R HS
Op = 1 .56 bpm at 3,430 psi off bottom
Vp = 322 bbls
1 :45 - 02:00 0.25 DRILL P Drilling build section in III at 1 -
Op 1.53 11.56 at 3
to 3.0 k to keep TF at 45R
02:00 . 02:20 0.33 DRILL fie 40L on bottom
Printed: 6120/2006 12:16:55 PM
Re: Sundry revision for 0-1 OB 306-029 e
'UZ- ....! '1
e
Subject: Re: Sundry revision for G-108 306-029
From: Winton Aubert <winton_aubert@admin.state.ak.us>
Date: Tue, 200615:49:39 -0800
Sean,
Per 20 MC 25.112 (i), AOGCC hereby approves alternate well plug placement in well P8U G-108
(PTD 202-117), with sundry procedure changes as described below. All other sundry approval
stipulations apply.
Winton Aubert
AOGCC
793-1231
McLaughlin, Sean M wrote:
Winton,
When the sundry was submitted for G-10B it was thought that no cement was present is the 3-1/2" x 7" IA at
9470'. In order to mill a window cement was planned to be squeezed into the annular space and into the
G-10B liner. The scope of work was as follows:
Pre-IDe: Work
I) Tubing has been inspected with a PDS caliper and is in good condition.
2) Integrity testing of the entire well is yet to be performed.
3) The 3 W' tubing will be punched in two places, 9493-97 and 9250-54.
4) A cast iron bridge plug will be set at 9485'.
5) A mechanical whipstock will be set at 9470'.
6) A minimum of 20 bbls of cement will be down squeezed through the punched 3 W' straddle
to cement both the straddle annulus and the G-l OB liner.
7) Remove flow line, remove well house, and level pad.
A Cement bond log was run and we determined there was good quality cement in the 3-1/2" x
7" IA at 9470'. Unfortunately the CIBP was set on the next run and it is not possible to
squeeze cement as planned. I propose the following as revised pre rig work:
Revised Pre-Rig Work Summary:
I. S Set DGL V in station #2. Done
2. S Run dummy whipstock drift to 9500 ft (top of2 3/8" liner). Done
3. S Tubing has been inspected with a PDS caliper and is in good condition. Done
4. 0 MIT-IA and MIT-OA Done
5. E Cement bond log 9100' to 9500' Done
6. E A cast iron bridge plug will be set at 9485'. Done
7. E A Weatherford 3-1/2" LSXwillbe set at 9470'.
8. 0 Remove flow line, remove well house, and level pad.
The top perforation in G-10 is at 9924' MD. BP has set a CIBP at 9485' and a whipstock at 9470'. The
sidetrack will exit G-10B into the Ivishak (Zone 4). The primary cement job on G-10C will be brought to the
top of the liner at 9425'. BP requests a waiver to 20 MC 25.112(E) which states the following:
(E) if the perforations are isolated from open hole below, a mechanical bridge plug set no more than 50 feet
above the top of the perforated interval, and either a minimum of 75 feet of cement placed on top of the plug
by the displacement method or a minimum of 25 feet of cement placed on top of the plug with a dump bailer.
lof2
5/2/2006 3 :49 PM
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFicbe\CvrPgs _ Inserts\MÏcrofilm _ Marker.doc
)
)
FRANK H. MURKOWSKI. GOVERNOR
ALASIiA OIL AND GAS
CONSERVATION CO.MltDSSION
333 W. 7TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Ted Stagg
CT Drilling Engineer
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay, G-10B
Sundry Number: 306-029
dJJ~-!l7
SCANNED JAN 2, 5 2.1)00
Dear Mr. Stagg:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
Please provide at least twenty-four (24) hours notice for a representative of
the Commission to witness any required test. Contact the Commission's
petroleum field inspector at (907) 659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
¡/Jrr/ ~
M// ..
-1-/
" I \
"7t.L-
DATED thi~ day of January, 2006
Daniel T. Seamount Jr.
Commissioner
Encl.
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 2 3 tOOh
APPLICATION FOR SUNDRY APPROV'lna Oil & Gas Cons. Commission
20 AAC 25.280 Anchorage
Wf:tk- "z..+(z.oo~
RECEIVED
1. Type of Request: a Abandon/' 0 Suspend 0 Operation Shutdown 0 Perforate 0 Other
o Alter Casing 0 Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well
o Change Approved Program 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
4. Current Well Class: /
III Development 0 Exploratory
o Stratigraphic 0 Service
5. Permit To Drill Number
202-117 /"
6. API Number:
50- 029-20553-02-00 /'
99519-6612
70.341
9. Well Name and Number:
PBU G-10B ./
ADL 028280
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
PRESENT WELL.CONOITION SUMMARY
Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured):
11204 9022 None
MD / TVD Burst
8. Property Designation:
11.
Total Depth MD (ft):
11241
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Total Depth TVD (ft):
9021
Length
Size
Junk (measured):
None
Collapse
Liner
110' 20" x 30" 110' 1101
26861 13-3/8" 2686' 26861 4930 2670
96201 9-5/8" 96201 87761 6870 4760
54711 7" 41491 - 96201 40791 - 87761 8160 7020
17431 2-3/8" 94981 - 112411 86981 - 90211 11200 11780
Perforation Depth MD (ft): Perforation Depth TVD (ft):
9924' - 111001 / 8989' - 90231
Packers and SSSV Type: 9-5/8" x 3-1/2" Baker 'SABL-31 packer
Tubing Size:
3-1/2", 9.3#
Tubing Grade: Tubing MD (ft):
L-80 96201
Packers and SSSV MD (ft): 40721 /'
12. Attachments:
181 Description Summary of Proposal
o Detailed Operations Program
14. Estimated Date for
Commencing Operations:
o BOP Sketch
13. Well Class after proposed work:
o Exploratory III Development 0 Service
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Ted Stagg Title CT Drilling Engineer
Signature J.l~
January 27, 2006
Date:
15. Well Status after proposed work:
o Oil o Gas
o WAG DGINJ
/
o Plugged III Abandoned
o WINJ 0 WDSPL
Contact Ted Stagg, 564-4694
Phone 564-4694
Commission Use Only
Date yfz y:, ,:
Prepared By Name/Number:
Terrie Hubble, 564-4628
Conditions of approval: Notify Commission so that a representative may witness
I Sundry Number: <....1fi 0 - () d q
o Plug Integrity
o BOP Test
o Mechanical Integrity Test
o Location Clearance
Other: Ai f /191./ eJ ¡::"v WL I c::> - 4 0 ( r ~.M.. ~ d -Co". ç,...: ck ~ !M2-l (¡ - '0 C ·
RBDMS 8Ft .IAN 2 4 2006
Subsequent Form Required: t 0 - 4- 07 .
~--
Approved By:
Form 10-403 Revised 07/2005
COMMISSIONER
APPROVED BY
THE COMMISSION
\ .
Date d--L\- ólt2
Submit In D ~plicate
ORIGINAL
)
)
033
To: Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Ted Stagg
CTD Engineer
Date: January 19, 2006
Re: Prep Prudhoe G-I0B for CTD sidetrack
Sundry approval is requested to prepare G-I0B for a sidetrack. G-I0B is a Zone IB sidetrack drilled in 2002.
Initial rates were low and continued to decline despite several add perf jobs. Over the past 12 months G-10B has /'
been produced only 5% of the time due to high GOR. With no further well work options available, a sidetrack to
a new area is planned.
/"
The sidetrack, G-I0C, is scheduled to be drilled by Nordic 1 on or about Feb. 12.2006. The plan calls for
cement squeezing both the G-10B liner and the 3 Y2" x 7" straddle annulus to prepare for a two-string window in
Zone 2. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic
diagram of the proposed sidetrack is attached for reference.
~ .
Pre-Rh!: Work
1) Tubing has been inspected with a PDS calliper and is in good condition.
2) Integrity testing of the entire well is yet to be per:~~' --/J
3) The 3 ~"tubing will be punched in two places, 9:t1?'':J7 and 9t~.
4) A cast iron bridge plug will be set at 9485'. - --
5) A mechanica:æw ipstock will be set at 9470' .
6) A minimum 20 961s of cement will be down squeezed through the punched 3 Y2" straddle to cement
both the strae1lnnulus and the G-10B liner.
7) Remove flow line, remove well house, and level pad.
The pre CTD work is slated to begin about Jan. 27. 2006.
,
. \~~ \ 0 - 4-0 ~ CA.f r YO tJ c....{ ·
Rie: Work
1) MIRV Nordic 1 and test BOPE.
2) Mill 2.74" window in Zone 2 through the 3 ~" x 7" straddle.
3) Drill sidetrack into Zone 1 B target.
4) Run solid 2 3/8" liner and cement.
5) Cleanout liner and perforate for production (-800 ft of perfs).
6) Freeze protect well and RDMO.
Post- Rie: Work
1) Install well house, flow line and gas lift valves.
~~-
CTD Drilling Engineer
564-4694
CC: Well File
Sondra Stewmanfferrie Hubble
)
TREE = 3-1/8" FMC W 14" QU
WELLHEAD = McEVOY
ACTUATOR = AXELSON
"kB.I~[èT;'- "-'^--'""-~^--~"^7Õ'j'
Bï=:..E[E\,r;·····^····^..···.._..·__.._m^'^'"_m32~27ï
~,.'^....~~"......"',.,,~..,,,.. ."'''".'''.,.w,..,,·,.''.,''......n..''n'''~'........,.,,.,................''.fi,...,.'
KOP = 3205'
",.............,.~,....,......~,."..........,,,..,,;"''',.,.,....,,..,,.,,'.''''.,...,.,........,~.....,""'.................,,.,.....~....,
Max Angle = 98 @ 11091'
DatumMD= 9745'
Datu m TV D = .......... ... ........ .... ... è8'öÓïs§
13-3/8" CSG, 72#, N-80, ID = 12.347" H 2686'
1 TOP OF 7" SCAB LNR H 4149'
Minimum ID = 1.995" @ 9507
2-3/4 II X 2-3/8 II XO
17" SCAB LNR, 29#, L-80, .371 bpf, ID = 6.814" H
\ TOPOF7" LNR H
8064'
8064'
9-5/8" CSG, 47#, L-80, 10 = 8.681" H 8250'
1 TOP OF WHIPSTOCK H 9620'
\ CIBP (06/10102) H 9680'
7" LNR, 29#, L-80, .0371 bpf, ID= 6.184" H 10235'
14-1/2" LNR, 15#, 13-8CR, .0188 bpf, 10 =4.283" H 11170'
PERFORATION SUMI\AA. RY
RB= LOG: SÆRRY SUN MWD 1 SWS fvCNL/GR
ANGLEA TTOP ÆRF: 59 @ 9924'
I\bte: Refer to A"oductbn œ for historical perf data
SIZE SPF INTERVAL OPN/SQZ DATE
1-9/16" 4 9924 - 9939 0 08/23/03
1-9/16" 6 9980-10030 0 01/14/03
1-9/16" 4 10185 - 10420 0 06/29/02
1-9/16" 4 10450 - 10530 0 06/29/02
1-9/16" 6 10630-10705 0 01/14/03
1-9/16" 4 10795 - 10945 0 06/29/02
1-9/16" 4 10990 - 11015 0 06/29/02
1-9/16" 4 11050 - 11100 0 06/29/02
')
G-10B
SAFETY NOTES: CHROME LINER
- 1
=>---I
2201' 1-1 3-1/2" HESXBOSSSV LAND NIP, 10= 2.75"
2604' \-1 9-5/8" r:N A<R \
~
GA S LIFT I\AA. N ORB.. S
~ ST MD TVO ŒV lYÆ VLV LATCH PORT DATE
2 3918 3878 28 FMHO D\I1Y RK 06/07/02
1 4039 3984 30 FMHO D\I1Y RK 06/07/02
/
4072' 1- 9-5/8" X 3-1/2" BKR SABL-3 PKR
W/KBH-22 ANCHOR SEAL ASSY, 10= 3.93"
4157' \-1 9-5/8" X 7" BAKER LNR PKR, 10 = 6.187" \
:8:
L
z
~
{@
"""
~
~
~W
8072' \-1 9-5/8" X 7" BAKER LNR PKR, 10 = 6.187" 1
9501' \-1 3" BKROEA..OYMEI\ITSLV, 10=2.250"
9507' 1-1 2-3/4" X 2-3/8" XO, ID = 1.995" \
\-1 B..MD TT NOT LOGGED
~
~
\2-3/8" LNR, 4.7#, L-80, .0039 bpf, D = 1.995" H 11241' I
DA.1E REV BY CO'vUv'ENTS
09/22103 CMJ/lLP DA TL1v1 tvD & PERF ANGLE
02/04104 CMJ/lLP PERF ANGLE CORREC1l0N
04/02105 OAV /lLH LNR TOP PKR PULLs)
PRUDHOE BAY UNIT
WELL: G-10B
PERMIT NJ: '2021170
API NJ: 50-029-20553-02
SEC 12, T11 N, R13E, 2554' SNL & 2368' WEL
DATE
. 04/81
06/25/95
06/30/02
01/14/03
07/13/03
08/23/03
REV BY COMvlENTS
ORIGINAL COMPLETION
SIDEfRACK(G-10A)
JLM/KK CTD SIDETRACK (G-10B)
KEY /tlh ADD PERFS
CMO/TLP KB B..EVA 1l0N CORREC1l0N
BJM'KK ADD PERFS
BP Exploration (Alaska)
3-1/8" FMC W/4" au
::: McEVOY
N--80, 10::: 12.347"
SCABLNR
x
17" SCAB LNR
"371 opf, 10::: 6.814"
1"LNR
L-80, ID 8.1381"
PERFORA TION SUMMARY
REF LOG: SPERRY SUN MWD I SWS MCNUGR
ANGLE AT TOP PERF: 59@9924'
Note: Refer to Production DB for historical perf data
SIZE 8PF INTERVA.L DATE
1-9/16" 4 9924 - 9939
1-9/18" 6 99S0 - 10030
1-9/16" 4 10185 - 10420
1-9/16" 4 10450-10530
1-9/16" 6 10630 10705
1-9/16" 4 10795 -
1-9/16" 4 10990 - 11015
1-9/16" 4 11050 - 11100
I Thg punch
I Baker 8-3 Packer, 10::: 3.93"
3-1/2" tb9, 9.2#, L-80, 10'" 2"99"
¡ TOP OF 4.5" LNR
¡ 7" LNR, 29#, .371 bpf, 10'" 6.814"
I 4-1/2" LNR,
.0188 bpf, 10 4"283"
OATE
04/81
05125/95
06/30/02
01114/03
07113/03
REV BY
JI..M/KK cm (G-10B)
KEY/tin AOO PERFS
KS ELEVATION CORRECTION
BJMlKK AOO PERFS
----
.....
.....
1
¡
8064'
11170' ¡.
DA TEE REV BY
04/02/05 DAV ITLH LNR TOP PKR PULLED
ES: CHROME LINER
2201'
3-112" HES XBD SSSV LAND NIP, 10::: 2.75"
9-518" DV PKR
GAS
œv
2S
30
LATCH PORT
RK oe/07/02
RK 05/07/02
J.
i
ID:::
Xl"
9-5/S" X 7"
LNR PKR, ID'" 5.187" I
9·5/8" SIDETRACK WINDOW
8250' - 8300'
I 2-318" LNR, 4.7#, L-SO, .0039
ID= 1.995"
PRUDHOE SA Y UNIT
WELL: G-10B
PERMIT No: 170
API No: 50-029-20553-02
see 12, T11 N, R13E, 2554' 8NL & 2368' WEL
BP Exph:m:!tion (Alaska)
I
PRUDHOE BAY, PRUDHOE OIL
PBU_G
PRUDHOE BAY
G-10B
100
50
Oil Rata (CD) ( Mbblfd )
Water Rate (CD) (Mbbl{d }
iÀs Rate (CD) ( MMcffd )
CUm Oil Prod ( MMbbl )
Gas! Oil Ratio
10
5
0.5
0.1
2002
03
Date
04
'"
05
RE
ALASKA OIL AND GAS CONSERVATION COMMISSION JUN 2 1. 2005
REPORT OF SUNDRY WELL OPERAT1Q~~§8[
')
')
STATE OF ALASKA
1. Operations Performed:
Abandon D
Alter CasingD
Change Approved Program D
PluQ Perforations 0
Perforate New Pool D
Perforate [X]
Stimulate D
WaiverD
Repair Well 0
Pull TubingD
Operation Shutdown 0
2. Operator
Name:
3. Address:
4. Current Well Class:
Development []]
ExploratoryD
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (fl):
StratigraphicD ServiceD
9. Well Name and Number:
G-10B
10. Field/Pool(s):
Prudhoe Bay Field 1 Prudhoe Oil Pool
70.34
8. Property Designation:
ADL-028280
11. Present Well Condition Summary:
Total Depth measured 11241 feet
true vertical 9021.4 feet Plugs (measured)
Effective Depth measured 11204 feet Junk (measured)
true vertical 9021.7 feet SCANNED JUl... a 7 2005
Casing Length Size MD TVD
CONDUCTOR 110 20 Inch 94 Lb H-40 38 148 38.0 148.0
SURFACE 2649 13-3/8" 72# N-80 37 - 2686 70.3 70.3
PRODUCTION 8214 9-518" 47# L-80 36 - 8250 70.3 70.3
LINER 3915 7" 29# L-80 4149 - 8064 4079.2 - 7369.1
LINER 1556 7" 29# L-80 8064 - 9620 7369.1 - 8776.1
SLEEVE 6 3" Baker DEPLOY SLV 9501 - 9507 8700.0 - 8703.5
LINER 1734 2-3/8" 4.7# L-80 9507 - 11241 8703.5 - 9021.4
Perforation depth:
E·..."
,~..._
j.(âì!dwöt~~rD
Time Extension D
Re-enter Suspended WellD
5. Permit to Drill Number:
202-1170
6. API Number
50-029-20553-02-00
None
None
Burst Collapse
1530 520
4930 2670
6870 4760
8160 7020
8160 7020
11200 11780
Measured depth: 9915-9940,9980-10030,10185-10420, 10450-10530, 10630-10705, 10795-10945, 10990-11015, 11050-11100
True vertical depth: 8984-8997,9014-9030,9037-9026,9025-9017, 9011-9013, 9021-9030, 9031-9031, 9029-9023
TubinQ ( size, ç¡rade, and measured depth):
3-112" 9.3# L-80
@ 34
9620
Packers & SSSV (type & measured depth):
3-1/2" Baker SABL-3 Packer
7" Baker Liner Packer
7" Baker Liner Packer
@ 4072
@ 4157
@ 8072
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
RBDMS 8FL JUN 2 2 2005
Prior to well operation:
Subsequent to operation:
Oil-Bbl
SHUT-IN
444
Representative Dailv Averaqe Production or Iniection Data
Gas-Met Water-Bbl Casing Pressure
Tubing Pressure
13
20584
6
14. Attachments:
15. Well Class after proposed work:
ExploratoryD
16. Well Status after proposed work:
OilŒ] GasD
Copies of Logs and Surveys run _
Daily Report of Well Operations _
~
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact DeWayne Schnorr
Printed Name De~aJne Schnorr ,() 0 .
Signature ~?/.at¡_...., ~ A7~
Title
Petroleum Engineer
Phone
564-5174
Form 10-404 Revised 4/2004
o
1073
Development ŒJ
Service D
WAG D GINJD WINJD WDSPLD
Prepared by DeWayne R. Schnorr (907) 564-5174
Sundry Number or NIA if C.O. Exempt:
NIA
Date
6/21/05
)
)
G-10B
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
04/30105 ***WELL SII ON ARRIVAL*** (ADPERFS). DRIFT WI 1 11/16" DUMMY GUN TO 10,042'
SLM AND STOPPED DUE DEV (TARGET DEPTH =9940). HAD TO WORK TOOLS
THROUGH SEVERE DOGLEG @ 96001.. ***NOTIFY PAD OP OF WELL STATUS, LEFT
S/I. ***
05/09/05 PERFORATED BOTTOM 141 (9926'-994014 SPF) OF 251 INTERVAL.... CONTINUE
TOMORROW.
05/10105 T/I/O=2350/54010 ASSIST E-LlNE. PUMPED 95 BBLS OF CRUDE TO ASSIST E-LlNE.
FINAL WHP'S= 50/54010
05/10105 PERFORATED TOP 111 (9915'-9926' 6 SPF) OF 25' INTERVAL...***JOB COMPLETED***
FLUIDS PUMPED
BBLS
95 CRUDE
95 TOTAL
Page 1
)
TREE = 3-118" FMCW/4" QU
WB..LI-EAD = McEVOY
'Ä crÜÄTOFf;;······,,",,·,,"",,· """ÄXELSÕN'
KB. 'ELEV"'';"'" . . . f6 j'
'SF: "ËC§l·;;,····..·w.w...."..ww.w."..wm·..··32·.·27"
, .....·....w,""...,·,....,,·,~, ..... ........,................,...,,,.
KOP = 3205'
"."",,, .m""'"""'""""'''..m.......'''' ............"'''...........~
Max Angle = 98 @ 11091'
Datum MD = 9745'
"ÕaiÙiTITVO; .....m.. ........ ·····8"80o;8S"
13-3/8" CSG, 72#, N-80, ID = 12.347" H 2686'
~
1 TOP OF 7" SCAB LNR H 4149'
Minimum ID = 1.995" @ 9507
2-3/4" X 2-3/8" XO
17" SCAB LNR, 29#, L-80, .371 bpf, ID = 6.814" H
1 TOPOF7" LNR H
8064'
8064'
9-5/8" CSG, 47#, L-80, ID = 8.681" H
1 TOP OF WHIPSTOCK H
8250'
9620'
1 CIBP (06/10/02) H 9680'
7' LNR, 29#, L-80, .0371 bpf, ID = 6.184" H 10235'
14-1/2" LNR, 15#, 13-8CR, .0188 bpf, ID =4.283" H 11170'
PERFORATION SUMI\J1t\ RY
RB= LOG: SÆRRY SUN MWD / SWS MCNLlGR
ANGLE A TTOP ÆRF: 59 @ 9924'
N:Jte: Refer to R"oductbn œ for historical perf data
SIZE SPF INTERVAL OPN/SQZ DATE
1-9/16" 4 9924 - 9939 0 08/23/03
1-9/16" 6 9980-10030 0 01/14/03
1-9/16" 4 10185 - 10420 0 06/29/02
1-9/16" 4 10450 - 10530 0 06/29/02
1-9/16" 6 10630- 10705 0 01/14/03
1-9/16" 4 10795 - 10945 0 06/29/02
1-9/16" 4 10990 - 11015 0 06/29/02
1-9/16" 4 11050 - 11100 0 06/29/02
~ " t; 9915-r¡9~' 0 OS/10105
/./I/I¡t ¿¡ ",~".. ''If 0 () 05/01//0..5
DATE
04/81
06/25195
06/30/02
01/14/03
07/13103
08/23103
REV BY COMMENTS
ORIGINAL COMPLETION
SlDErRACK (G-1 OA)
JLM/KK CTDSIŒTRACK (G-10B)
KEY/tlh ADD PERFS
CMO/TLP KB B..EV A 1l0N CORREC1l0N
BJM'KK ADD PERFS
')
G-108
SAFETY NOTES: CHROME UNER
"
1
=>---f
2201' 1-1 3-1/2" HESXBDSSSV LAND NIP, ID= 2.75"
2604' 1-1 9-5/8" rN A<R I
:8:
L
:g:
GA S LIFT I\J1t\ N DRB..S
~ ST MD TVD DEV 1YÆ VLV LATa; PORT DATE
2 3918 3878 28 FMHO DMY RK 06/07/02
1 4039 3984 30 FMHO DMY RK 06/07/02
4072' 1- 9-5/8" X 3-1/2" BKR SABL-3 PKR
W/KBH-22 ANa;OR SEAL ASSY, ID = 3.93"
4157' 1-1 9-5/8"X7"BAKERLNRPKR,ID=6.187" 1
~
~
8072' 1-1 9-5/8" X 7" BAKER LNR PKR, ID = 6.187" I
9501' 1-1 3" BKRDEA...OYMENTSLV, ID=2.250"
9507' 1-1 2-3/4" X 2-318" XO, ID = 1.995" 1
1-1 B..MDTT NOT LOGGED
~
~
12-318" LNR, 4.7#, L-80, .0039 bpf, D = 1.995" H 11241' I
DA TE REV BY COMMENTS
09/22103 Ctv'O/lLP DATUVI MD & PERF ANGLE
02/04104 Ctv'O/lLP PERF ANGLE CORREC1l0N
04/02105 DAV /lLH LNR TOP PKR PLlLBJ
PRUDI-DEBAY LNIT
WELL: G-10B
PERMT N:J: ~021170
API N:J: 50-029-20553-02
SEC 12, T11N, R13E, 2554' SNL & 2368' WEL
BP Exploration (Alaska)
1 ~ JJ\.¡) ~ '\
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2004
)r úJ. v(, / ~W>L )J0'~
API No. 50-029-20553-02-00
Well Name/No. PRUDHOE 8A Y UNIT G-108
Permit to Drill 2021170
MO
11241 ~
------ - .-------
- --~- ----------
Operator 8P EXPLORATION (ALASKA) INC
.---
Current Status 1-01L
TVO 9021 ./
Completion Date 6/30/2002
UIC N
Completion Status 1-01L
REQUIRED INFORMATION
Mud Log No
Samples No
.. (r:~=~)
Olrectlonal Surve~ Yes
. ~.
- - ----- "-
- -------"- --
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
~ ~- - ~-------- ~ona[survey
~pt Directional SurVey
Q...EfY Cø ~4 LIS Verification
~/c v11238 Neutron
, fr,5Í Directional Survey
.-.EÐ 0 ~nalsurvey
~
~g
:'~C
i
~/
¡~-
I
il1pt
I
~O
W. CAse
! ~ --~ _P~f--
Log Log Run Interval OH/ .----
Scale Media No Start Stop CH Received Comments
1 9620 11241 Open 7/24/2002
9620 11241 Open 7/24/2002
9603 10914 Case 2/26/2003
9255 11200 Case 10/25/2002
9618 1 0400 Open 8/14/2002
9618 10400 Open 8/14/2002
25 Blu 9234 11202 Case 1 0/25/2002 C IV C/ (Vu vv... fs¡ (1..(
25 Blu 1 j-Uv W944 11241 Open 5/14/2003
10944 11241 Open 5/14/2003
25 Blu 1 }I'{l) ~ 11241 Open 5/14/2003
9603 10914 # Case 2/26/2003
10944 11241 Open 5/14/2003
9739 1 0691 Case 1/27/2003 --
9607 1 0943
25 9620 1 0944 Open ROP, NGP
Sample
Interval Set
Start Stop Sent Received Number Comments
Neutron
Lf5âinma Ray
[)'1717 LIS Verification
,Gamma. Ray
LIS Verification
LIS Verification
~7 LlSVerificátion
(/1177 4 LIS Verification
<-1'1774 Rate of Penetration
Well Cores/Samples Information:
-- -----
Name
Permit to Drill 2021170
MO 11241
TVD 9021
Well Cored?
ADDITIONAL INFORMATION
y~
Chips Received? -v+-N--
Analysis
Received?
Comments:
-----._~-
------ -"- --- -----
--Yl-N----
- ---~-------
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2004
Well Name/No. PRUDHOE BAY UNIT G-10B
Operator BP EXPLORATION (ALASKA) INC
Completion Date 6/30/2002
Completion Status 1-01L
Current Status 1-01L
Daily History Received?
Ã
(Ý)/N
r(9N
Formation Tops
Date:
API No. 50-029-20553-02-00
UIC N
~
.~
') STATE OF ALASKA - \
ALASKA OIL AND GAS CONSERVATION CO,v,IV1ISSION
REPORT OF SUNDRY WELL OPERATIONS
¡j.
1. Operations Performed:
Abanon 0
After Casino 0
Change Approved Program 0
SuspendD Operation ShutdownD Perforate. Variance 0
Repair Well 0 Pluo PerforationsD StimulateD Time ExtensionO
Pull TubingO Perforate New PoolD Re-enter Suspended Well 0
Annuar Disposal 0
OtherO
ADD PERFS
2. Operator
Name: BP Exploration (Alaska), Inc.
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
70.34
8. Property Designation:
ADL 028280
11. Present Well Condition Summary:
4. Current Well Class:
Development. ExploratoryO
5. Permit to Drill Number:
202-117
6. API Number
50-029-20553-02-00
Stratigraphic D Service 0
9. Well Name and Number:
G-10B
10. Field/Pool(s):
Prudhoe Bay Field I Prudhoe Bay Oil Pool
Total Depth measured 11241 feet
true vertical 9021 feet Plugs (measured)
Effective Depth measured 11204 feet Junk (measured)
true vertical 9022 feet
Casing Length Size MO TVO Burst Collapse
Conductor 110' 2011 148' 148' 40K 520
Surface 2648' 13-3/811 26861 2686' 80K 2670
Intermediate 9582' 9-5/811 9620' 8776' 80K 4760
Scab Liner 711 41491-8064' 4079'-7369' 80K 6280
Liner 5471' 711 80641-96201 7369'-8776' 80K 6280
Sidetrack Liner 17431 2-3/811 9498'-11241' 8698'-9021' 80K 11780
Perforation depth: Measured depth: Open Perfs 99241-99391, 99801-100301,101851-104201,104501-105301,
Open Perfs 106301-107051, 107951-109451, 109901-11015', 110501-111001
True vertical depth: Open Perfs 8989'-89961,90141-90301,9037'-9026',90251-9017',
Open Perfs 9011'-9013',9021'-90301,90311-9031',9029'-90231
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: ~~ :-t- :\: :,
Representative Daily Average Production or Injection D,~ta , ,c. .
Gas-Mcf Water-Bbl CasiAQ,Pres-sure " . -Tubing.P.ressure.".:.
Daily Report of Well Operations_X
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact DeWayne R. Schnorr
Printed Name DeWayne R. Schnorr ,) /J -
Signature A;.t'~~- ~~ Phone 907/564-5174 Oate
ORiGiNAL t.-8fL
Tubing: ( size, grade, and measured depth)
Packers & SSSV (type & measured depth)
13
Oil-Bbl
Prior to well operation:
Subsequent to operation:
14. Attachments:
SHUT -IN
698
Copies of Logs and Surveys run -
Form 1 0-404 Revised 2/2003
3-1/211 9.3# L-80 TBG @ 9620'.
9-5/8Ix3-1/2" BKR PKR @ 4072'. 9-5/8"x7" BKR LNR PRK1s @ 4157' & 80721.
3-1/2" Eclipse LNR Top PKR @ 9498'. 3-1/2" HES XBD SSSV Nip @ 22011.
~ "."', -''''' .~..... ". -"'~." j ..':-
. .
;~ "'.t..:.. ' ....
, '
...' . ~ ~ : . :....,~ ,-
-,
.. .'.- "...., (4""
20758
14
15. Well Class after proposed work:
ExploratoryD Development.
16. Well Status after proposed work:
Oil. GasO WAGO GINJO
797
Service D
WINJO WDSPLO
Sundry Number or N/A if C.O. Exempt:
N/A
Title
Techical Assistant
~..~
";'
')
")
G-108
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
05/18/2003
05/19/2003
OS/20/2003
08/21/2003
08/23/2003
09/12/2003
ANN-COMM (AC-EVAL AND REPAIR): AC-BLEED
ANN-COMM (AC-EVAL AND REPAIR): AC-MONITOR
ANN-COMM (AC-EVAL AND REPAIR): AC-MONITOR
PERFORATING: DRIFT/TAG
PERFORATING: PERFORATING
TESTEVENT --- BOPD: 681, BWPD: 12, MCFPD: 20,983, AL RATE: 0
EVENT SUMMARY
05/18/03 T/I/O = 760/700/1060. BLEED OA AND MONITOR BUR. OA FL @ SURFACE.
BLED OA FROM 1060 PSI TO 0 PSI IN 5 MINUTES. (0.5 BBL RETURNED).
MONITORED FOR 30 MINUTES. OAP ROSE TO 60 PSI. FINAL WHp1s =
760/700/60.
05/19/03 T/I/O = 2200/640/VAC. MONITOR WHp1s POST-OA BLEED. SHUT-IN. OAP
DROPPED 60 PSI OVERNIGHT.
OS/20/03 T/I/O=SSV/640/VAC MONITOR WHp1s POST OA BLEED. NO CHANGE SINCE
YESTERDAY.
08/21/03 (WELL SHUT IN ON ARRIVAL) DRIFT W/ 1.625 X 154" DUMMY GUN. STOP
DUE TO DEV. @ 100521 SLM + 381 = 100901 CORR TO RKB. RDMO. (LEFT
WELL SHUT IN ) ( PRE ADD PREF )
08/23/03 PERF 99241-99391 WITH 1.56" 1606 POWERJET 4 SPF, 10.7" PENE, 0.19" EH, 3.4
GMS. CORRELATE TO SWS MCNL DATED 6-29-02 AT LINER TOP.
***PAD OPERATOR TO POP WELL AND TEST***
09/17/03 TESTEVENT --- BOPD: 681, BWPD: 12, MCFPD: 20,983, AL RATE: 0
FLUIDS PUMPED
BBLS
1
1
DIESEL FOR PIT OF SURFACE PRESSURE CONTROL EQUIPMENT
TOTAL
ADD PERFS
08/23/2003
THE FOLLOWING INTERVAL WAS PERFORATED USING THE 1.56" PJ1606 POWERJET
GUN, LOADED @ 4 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION.
99241 - 99391
Page 1
)
Jo À-,.. 1
--..,
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
i\nchorage, Alaska 99501
June 05, 2003
RE:MWDFormation Evaluation Logs: G-IOB,
AK-MW-22098
G-IOB:
Digital Log Images
50-029-20553-02
1 CD Rom
PLEAS.E ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
i\nchorage, Alaska 99508
J .:1' "]
Date: if;'! ./!J
Signed:
~
. \
~.
,
Transmittal Form
INTEQ
To:
AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska
99501
Attention:
Lisa Weepie
Reference:
G-I0B
: Contains the following:
i 1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
'.1
)
'&1.
BAKER
HUGHES
Anchorage GEOScience Center
1 blueline - GR/Directional Measured Depth Log
1 blueline - GR/Directional TVD Log
LAC Job#: 319114
Sent By: Glen Horel
Received ~" 6- QQo p------
Date: May 13, 2003
Date:
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COpy
FAX: (907) 267-6623
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska
99518
Direct: (907) 267-6612
FAX: (907) 267-6623
RECEIVED
MAY 14 2003
AI_a Qi & Gas Coos. Cornmileion
Am::hCt1ge
:;; 03 -//1
}J7J7
[[:-=;:;~':;;~,~:......I-
i~"~ ,~;'~~';P;~t ,,~", ~~
!.... "', ...
:;:r~ ;; '~~ :,n. :W~
, (.1~',' ,":) CtO"
i=:....:::. IÜ, .;~ ."I.~
.,.......'"~., 1.1,.......,,... .
. .
i
l=,. .~~ci~
: ,"..',1:11111,""",".
:~~ N8JI iIrIo~ fll~ 11'111[,'
[-~~.~~!~~~~'~~-=-~~-~~
:,,~~:i:~:~:~5:': ¡ _"1""~ ~
.~-- ""''''''''''
..--.-.-.-.-'..
;---~
. .
:-"'1"000-
"". --- - -.
'----"-.-------.------ ---~----'-
)
)
rXOJ-l/7
I / 5/~
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation COl11ffi.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
February 25, 2003
RE: MWD Formation Evaluation Logs G-IOB,
AK-MW-22098
1 LDWG formatted Disc with verification listing.
~I#: 50-029-20553-02
,
PLEASE ACKNOWLEDGE RECEIPT BY SIGNJNG AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Si~~~
J
RECEIVED
FEB 26 2003
A!a8ka 01 &; Gas Cons. Commi88ion
Anchorage
,lrJs
C!\J ...
)
WELL LOG
TRANSMITTAL
)
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7lhStreet
Suite # 700
Anchorage. Alaska 99501
RE:
Distribution - Final Print(sJ
eX ti}~ / 17
I / to/ 7
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of :
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 1369
Stafford, TX 77497
BP Exploration (Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
WELL
DATE
LOG
TYPE
DIGITAL
OR
CD-ROM
1
MYLAR /
SEPIA
FILM
1
BLUE LINE
PRINT(S]
REPORT
OR
COLOR
Open Hole
1
Res. Eva!. CH
1
1
1
G-1 DB
1-13&14-
03
Mech. CH
1
Caliper Survey
Signed:
~(J- OQOfAJ
Date:
Print Name:
RECEIVED
JAN 2 7 2003
AJaeke on & Gas Cons. CommiMion
Anch9'Jge
PRoAcIiv( DiAGNOSTic SmviC[s, INC., } 10 K STREET SUiIE 200, ANChoRAGE, AK 99~0 I
Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage@memorylog.com Website: ww\v.mcl11orylog.col11
Schlumberger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Well
G-10B ~O~-}JÎ
D.S. 7-13B,.;la~- J liD
D.S. 11-24A Jc.¡,~-~Ot./
D.S.6-01 I í ~'O4 9
Job#
22332 MCNL
22333 MCNL
22381 RST
22378 RST
10/17/02
NO. 2488
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Log Description
Color
Date Blueline Sepia Prints CD
06/29/02 1 1
07/08/02 1 1
07/06/02 1 1
07/07/02 1 1
-~
~.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage. Alaska 99508
Date Delivered:
RECEIVED
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
:~~,v4~~Cb~
OCT 25 2002
A1~ ()¡~ & GðS Cooi. C~!J!IT1i::Mon
AnchOflge
)
')
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4 Location of well at surface ----'~ ~'I"ØI. ~ .~It'
. 2554' SNL, 2368' WEL, SEC. 12, T11 N, R13E,UM; COMPLET!ON I , ~I.!. ' bëA"".',(
At top of productive interval "~ DAlE ',. \ ~,.:, :~:
3613' SNL, 4334' WEL, SEC. 12, T11N, R13E, uM' "'~3ó'I? "~s1J1t ", r
, At total depth VERI FlED ' \""'~, .,,:'\ :,
3487' SNL, 345' WEL, SEC. 11, T11 N, R13E, UM " .!'Þ ", ,-k!:;~~:~..~::!.~~
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 70.34' ADL 028280
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
6/21/2002 6/27/2002 6/30/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
11241 9021 FT 11204 9022 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, ROP, Memory CNL, CCL
,23.
CASING
SIZE
20" x 30"
13-3/8"
9-518"
7"
WT. PER FT.
Insulated
72#
47#
29#
4.6#
GRADE
Conductor
L-80
L-80
L-80
L-80
2-3/8"
Classification of Service Well
7. Permit Number
202-117
8. API Number
50- 029-20553-02
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
G.10B
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
15. Water depth, if offshore 16. No. of Completions
NIA MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2201' MD 1900' (Approx.)
CASING, liNER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 110' 36" Cement to Surface
Surface 2686' 17-1/2" 3500 sx AS 11,20 sx Top Job
Surface 9620' 12-1/4" 1100 sx Class 'G', 140 sx AS I
4149' 9620' 8-1/2" 1011 sx Class 'G'
9498' 11241' 3" 72 sx Class 'G'
25.
SIZE
3-1/2",9.3#, L-80
MD
TVD
AMOUNT PULLED
TUSING RECORD
DEPTH SET (MD)
9620'
PACKER SET (MD)
4072'
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
1.56 Gun Diameter, 4 spf
MD TVD
10185' - 10420' 9037' - 9026'
10450' - 10530' 9025' - 9017'
10795' -10945' 9021' - 9030'
10990' -11015' 9031' - 9031'
11050' - 11100' 9029' - 9024'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
2000' Freeze Protected with MeOH
26.
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
July 8,2002 Flowing
Date of Test Hours Tested PRODUCTION FOR OIL-BsL GAs-McF WATER-BsL CHOKE SIZE
7/2212002 4 TEST PERIOD 507 3753 16 74.61°
Flow Tubing Casing Pressure CALCULATED OIL-BSL GAs-McF WATER-BSL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE 25.9
?8. CORE DATA IJ I- (~ t-1 ,,/ t [;
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit coreYJ¡i~. ~--
No core samples were taken.
Form 10-407 Rev. 07-01-80
r~' i''''"\\ : ('~" ~,
. ) f\ \ () '~
r\ L
r'\
GAS-OIL RATIO
7396
JUL 2. Ó 2002
Alaska Oil & Gas Cons. \jOimi1lSSI0r~
Anchorage
G~
RBDMS 8FL JUL 30 2002
Submit In Duplicate
')
)
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
2388
9650'
8798'
25N
9695'
8832'
21 TS I Zone 2A
9795'
8907'
Zone 1 B
9905'
8978'
RE(E~\fEft)
d) r ")0112
JUL ~ ,J L \,
Alaska Oi! & Gas Cons. GOmffilssmn
Anchorage
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I ~erebY certify that the fOre,ing.. is true and correct to the best of my knowledge
Signed TerrieHubble ~~. fÚ¡Mfð Title Technical Assistant
G-10B 202-117
Well Number Permit No. I Approval No.
Date 07..~.{)~
Prepared By Name/Number: Terrie Hubble, 564~4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITeM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
\\ \ ~
1\ .
~ \\ \J j
\
II.-
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
/)
')
BP EXPLORATION
QperationsSummary . Rep.ort
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Page 1 of15
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Dåte From - To Hours Task Code NPT Phase Descriptiön of Operations
6/16/2002 18:00 - 19:00 1.00 MOB P PRE Rig Released from 15-31A @ 18:006/16/2002. Hang and
secure BOPs.
19:00 - 22:30 3.50 MOB P PRE P/U rig. Move off well. Roll up herculite. R/U & LID rams,
PJSM. R/U & LID windwalls. R/U derrick stand.
PJSM. Scope & LID derrick.
22:30 - 23:00 0.50 MOB P PRE Jack up rig. Move to front of pad.
23:00 - 23:30 0.50 MOB P PRE W.O. Security & tool service
23:30 - 00:00 0.50 MOB P PRE PJSM on rig move.
6/17/2002 00:00 - 06:00 6.00 MOB P PRE Move rig from DS#15 to G-pad (10 miles).
06:00 - 06:30 0.50 MOB P PRE PJSM prior to raising derrick & windwalls.
06:30 - 11 :00 4,50 RIGU P PRE Raise derrick & windwalls, Scope-in tilt rams, Lay herculite
tarps & cellar dykes on G-10, R/O tree cap. Meanwhile
de-pressure flowline from 680psi to Opsi. WHP = Opsi. Perform
wellsite pre-inspection with pad operator.
11 :00 - 12:00 1.00 RIGU P PRE Move over well onto G-10.
12:00-12:15 0.25 RIGU P PRE PJSM for N/U BOPs.
12:15 - 14:00 1.75 RIGU P PRE Nipple up BOPs. Rig accepted at 12:00 hrs on 6/17/2002.
Meanwhile spot & berm cutting tank & flowback tanks.
14:00 - 17:45 3.75 RIGU P PRE PJSM. P/U injector head & M/U guide arch. Stab CT & SIB
injector.
17:45 - 18:30 0.75 BOPSURP PRE Prep for BOP testing. Meanwhile take-on 300bbls of 2ppb, 2%
KCL milling fluid into rig pits.
18:30 - 00:00 5.50 BOPSUR P OECOMP Pressure test BOPE. Witness of test waived by AOGCC's
Chuck Scheve.
6/18/2002 00:00 - 00:30 0.50 CLEAN P DECOMP Weld-on CTC. Pull test.
00:30 - 01 :00 0.50 CLEAN P DECaMP Load dart, fill coil with bio water (41.8 bbls calculated). Bump
at 41.0 bbls.
01 :00 - 02:00 1.00 CLEAN P DECaMP PT CTC. Open well -- no pressure, hole full. MU BHA#1
(2-1/8" NaviOrill motor and 2.74" HCC 0331 mill). The mill will
pass thru a 2.75" gage ring easily but not a 2.74" gage ring.
Change packoff.
02:00 - 02:30 0.50 CLEAN P DECaMP Safety (pre-spud) meeting. lAP = 50 psi. Flowline = 0 psi.
02:30 - 04:30 2.00 CLEAN P DECaMP RIH. Tag and stall 2194' (SSSV landing nipple -- 2.75" ID).
Repeat. Try easing into it 1.5/2000. Stall again. Run at it dry
-- stack weight and fell through. RIH. 8500' wt check: 25k up;
14k down. RIH. Seeing some motor work 9074'. PU clean.
Wash into hole at 40 FPM (1.6/1900). Seeing fluctuation in
MW, but no loss in RIH weight. At 9200', bigger bump in MW.
Reduce speed to 20 FPM. Steady 150 psi in MW, but nothing
hard. PUH slow washing for 50'. Clean. RIH 20 FPM. Tag
and stall 9301' (MM out = 20 bbls).
04:30 - 05:30 1,00 CLEAN P OECOMP Mill starting at 9301' (fluid: 2 ppb biozan water). Broke through
stringer. Wash thru soft stuff, but with 350 psi of motor work,
PU's are clean 27k, Stall 9339', Thick, green cement over
shakers (pH = 13), Wash up hole 100', RIH. Mill past hard
spot at 9339', Mill to 9350' with 100 psi MW, still very soft.
Wiper to 9000'. RIH clean. Stall 9353'. Wash to 9400' --
same thing -- nothing hard, but lots of cement. Wiper at 10
FPM to 9300', RIH clean,
05:30 - 06:00 0.50 CLEAN P DECaMP Wash contaminated cement with 300 psi MW at 50 - 300 FPH
to 9450', Wiper to 9350',
06:00 - 06:30 0,50 CLEAN P DECaMP Wash/mill cement with 400 psi MW at 180 FPH to 9500',
Clean PUH off bottom, 28k. Wiper to 9450',
Printed: 7/10/2002 12:18:31 PM
)
')
BP .EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From- To Hours Task Code NPT Phase
6/18/2002
06:30 - 07:05
0.58 CLEAN P
DECaMP
07:05 - 07: 15
07:15 - 08:05
0.17 CLEAN P
0.83 CLEAN P
DECaMP
DECaMP
08:05 - 09:45 1.67 CLEAN P DECaMP
09:45 - 10:30 0.75 CLEAN P DECaMP
10:30 - 11: 15 0.75 CLEAN P DECaMP
11: 15 - 11 :30 0.25 STWHIP P WEXIT
11 : 30 - 11:40 0.17 STWHIP P WEXIT
11 :40 - 11 :50 0.17 STWHIP P WEXIT
11 :50 - 12:00 0.17 STWHIP P WEXIT
12:00 - 12:45 0.75 STWHIP N SFAL WEXIT
12:45 - 18:15 5.50 STWHIP N SFAL WEXIT
18:15 -19:10 0.92 STWHIP P WEXIT
19:10 - 21:05 1.92 STWHIP P WEXIT
21 :05 - 21:45 0.67 STWHIP P WEXIT
21 :45 - 23:00 1.25 STWHIP P WEXIT
23:00 - 23:15 0.25 STWHIP N OFAL WEXIT
23:15 - 00:00 0.75 STWHIP N WEXIT
6/19/2002 00:00 - 00:30 0.50 STWHIP N OFAL WEXIT
00:30 - 01 :50 1.33 STWHIP N WEXIT
01 :50 - 03:40 1.83 STWHIP N WEXIT
03:40 - 04:00 0.33 STWHIP N WEXIT
04:00 - 05:30 1.50 STWHIP P WEXIT
05:30 - 06:30 1.00 STWHIP P WEXIT
06:30 - 08:00 1.50 STWHIP P WEXIT
08:00 - 10:00 2,00 STWHIP P WEXIT
10:00 - 11 :00 1.00 STWHIP P WEXIT
Page 2 of15
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Description of Operations
Continue washing green cement to 9600' @ 1.6bpm,
2350/2550psi, & 140fph Rap,
Wiper @ 1 Of pm to 9550'. Clean P/U @ 27.5k. RBIH clean.
Mill hard cement to 9607' @ 1.6bpm, 2350/2550psi, & 20fph
ROP. Grind to a halt @ 9608'. Stack 2.2k WOB & stall.
Suspect whipstock tag @ 9608'. Pump down 10bbls of 3.5ppb
bio hi-vis around mill.
Paint EOP @ 9200' & POOH clean with cement cleanout assy,
Saw very slight bobble @ SSSV,
OOH. LID cement cleanout BHA#1.
Take-on fresh 300bbls of 2ppb, 2% KCL milling fluid into rig
pits & dump used cement contaminated KCI water. Displace
CT to new KCL water.
PJSM on P/U window milling BHA#2.
M/U Weatherford orienter to CTC. Surface test orienter - OK,
getting 3 for 3. LID orienter.
M/U BOT MHA to CTC. Pressure test to 3500psi - OK. SIB
injector with MHA.
M/U 2.74" HCC DSM to Weatherford 2.5 degs fixed motor for
window milling BHA#2.
Sperry tiny-trak tools not passing surface tests. Troubleshoot &
rectify same.
Continue M/U BHA#2 with Sperry tiny-trak MWO tool. 2 jts of
2-1/16" tbg & MHA. Fin resolve problems w/ MWD
MU milling BHA
RIH w/ BHA #2 (2.5 deg motor, 2.74" DSM). Orient to get by
set down at GLM #1 @ 4065' CTO
9600' 30k. RIH and tag @ 9617' CTO. PUH and start motor
1.5/3220 TF at 117R. Orient to 162R. RIH at tag at min rate
at 9617'. PUH, check TF at 175L. RIH at rate and first motor
work at 9617.9'. Corr to 9620'
Begin time milling by procedure 1.5/3165/175L. Mill to 9620.8'
Lost 100 psi and stacking wt-no signal from Sperry tool. Flag
CT
POOH to check BHA. Assume washout above MWO
Continue POOH to check BHA
Found leak in upper bleed sub, LD. PT MHA, ok, Check rest
of BHA, ok. Mill was 10-15% worn
RIH w/ BHA #3, SHT. Set down at 4067' CTD at GLM #1,
Orient a couple clicks to get by
9600' Chk TF @ 44R. Orient to 129R. RIH at min rate and
tag at 9621' CTO. PUH and start pump, 162R. RIH and first
motor work at 9619.9' CTO. Corr to 9620'
Restart time milling from 9620.0' by procedure 1,5/3330/162R
PVT 245
9621.0' 1.5/3320/168R
9621.5', flag pipe, PU l' to begin time milling sequence,
9620,5', WOB=O, String weight=17180 Ibs, CTP=3340 psi at
1.4 bpm, 100% returns, TF 162R
9620,7',08:00 update, WOB=O, SW=13800, CTP=3240/1.4,
100% returns, TF 168R.
9621,7', 10:00 update. WOB=2625, SW=8800, CTP=3340,
100% returns, TF=162R.
Printed: 7/10/2002 12:18:31 PM
)
')
BPEXPLORA TION
Operations..summary.Report
Page 3 of 15
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Date From ..;To Hours Task Code NPT Phase Description of Operations
6/19/2002 11 :00 - 12:00 1.00 STWHIP P WEXIT 9622.3',11 :00 update. WOB=3700, SW=7700, CTP=3400,
100% returns, TF=157R.
12:00 - 13:00 1.00 STWHIP P WEXIT 9623.0, 12:00 update. WOB=4300, SW=6900, CTP=3430,
100% returns, TF= 157R.
12:55 - 13:45 0.83 STWHIP P WEXIT 9624.0', Drilling break on WOB and CTP. WOB=6140,
SW=5260, CTP=3200, TF=157R. Continue milling at 6
min/0.1'.
13:45 - 13:47 0,03 STWHIP P WEXIT Pickup to check free spin, PU at 27klbs, free spin 3100 psi.
13:47 - 14:25 0.63 STWHIP P WEXIT 9625.8', Continue to attempt to mill ahead. Not making any
Rap, just stacking. Check samples. 95% cement, some
metal, and definate small amount of formation sand.
14:25 - 15:55 1,50 STWHIP N DPRB WEXIT Despite 100 psi motor work, DO concerned that motor is not
working properly. POOH to inspect motor. Paint flag at
9623.0' bit depth.
15:55 - 18:55 3.00 STWHIP N OPRB WEXIT Tag up at surface. Inspect BHA. No problems found. Motor
appears to be in good shape. Mill in good shape. The mill
guages 2.74", with a swirl pattern on face. Pick up new motor
and new fat radius window mill. Swap out Sperry MWO probe,
BOT MHA
18:55 - 20:55 2.00 STWHIP N OPRB WEXIT RIH w/ BHA #4
20:55 - 21 :05 0.17 STWHIP N OPRB WEXIT Tag at 9623' CTO. PUH 29k, chk TF 1.5/3250/164R. RIH to
9622.4' and had sli wt loss. Did not correct depth
21 :05 - 22:00 0.92 STWHIP N DPRB WEXIT Resume milling from 9622.4' 1.5/3250/150R Sperry MWO quit
pulsing when 1.5k stacked at 9623.0'. Work to get tool
restarted and not
22:00 - 23:35 1.58 STWHIP N OFAL WEXIT POOH for MWO
23:35 - 00:00 0.42 STWHIP N DFAL WEXIT Change MWO probe. Check BHA
6/20/2002 00:00 - 00:40 0.67 STWHIP N OFAL WEXIT Fin change MWO probe and check BHA. Mill had center wear.
SS found solenoid that controls pulse to be bad
00:40 - 01 :05 0.42 STWHIP N WEXIT RIH w/ BHA #5. SHT, pulse ok, but not sending directional
data (SS forgot to program it). POOH
01 :05 - 02:05 1.00 STWHIP N WEXIT Reprogram SS MWO probe. Change out MHA
02:05 - 03:50 1.75 STWHIP N WEXIT RIH w/ BHA #6 SHT
03:50 - 04:25 0.58 STWHIP N WEXIT 9600' PUH 28.9k and chk TF @ 175L. RIH at min at tag at
9623.5' CTO. PUH and chk TF @ 158L. Orient around to
157R. RIH
04:25 - 05:40 1.25 STWHIP P WEXIT First motor work at 9622.5' (did not correct). Resume time
milling from here 0.1'/6 min 1.4/3320/152R 1000# WOB. Get a
click at 9623.1'
05:40 - 06:30 0.83 STWHIP P WEXIT 9623.5' 1.4/3250/174R 3000# WOB
06:30 - 07:50 1.33 STWHIP P WEXIT 9624,4', Pump 15 bbl hig h vis sweep to check for formation
cuttings, Milling ahead at 1 fph. Free spin 3320 spi,
CTP=3450 psi, String Wt=8900 Ibs, WOB=4150 Ibs. 1,5 bpm,
100% returns. Geo reports trace of sand in cuttings,
07:50 - 09:05 1,25 STWHIP P WEXIT 9626,0', Drilling break, Rap picked up, String weight came
back, CTP dropped, Getting drill offs. We appear to be in
open hole. Drill ahead to get 10' of rathole. Geo reports
significantly more sand in cuttings and some chert,
09:05 - 10:00 0,92 STWHIP P WEXIT 9628,2', Several stalls, Try milling down easily. Possibly chert
pebbles or junk from window,
10:00 - 10:50 0.83 STWHIP P WEXIT 9631', We have 6' of open hole, and Rap has slowed down.
1.251 STWHIPlp Pump 10 bbl 2# biozan sweep.
10:50 - 12:05 WEXIT POH, Sample shows 15% formation and a lot of metal
I I
Printed: 7/10/2002 12:18:31 PM
)
)
BP EXPLORATION
Operations .Sum maryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
6/20/2002
6/21/2002
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From- To Hours Task Code NPT Phase
10:50 - 12:05 1.25 STWHIP P WEXIT
12:05 - 13:00 0.92 STWHIP P WEXIT
13:00 - 13:30 0.50 STWHIP N SFAL WEXIT
13:30 - 15:10 1.67 STWHIP P WEXIT
15:10 - 15:40 0,50 STWHIP P WEXIT
15:40 - 15:45 0.08 STWHIP P WEXIT
15:45 - 16:00 0.25 STWHIP P WEXIT
16:00 - 16:15 0.25 STWHIP P WEXIT
16:15 - 16:30 0.25 STWHIP P WEXIT
16:30 - 18:30 2.00 STWHIP P WEXIT
18:30 -19:15 0.75 STWHIP P WEXIT
19:15 - 22:30 3.25 STWHIP P WEXIT
22:30 - 00:00 1.50 STWHIP P WEXIT
00:00 - 00:15 0.25 STWHIP P WEXIT
00:15 - 00:35 0.33 STWHIP P WEXIT
00:35 - 03: 1 0 2,58 STWHIP P WEXIT
03:10 - 03:30 0.33 STWHIP P WEXIT
03:30 - 04:35 1.08 STWHIP P WEXIT
04:35 - 05:55 1.33 STWHIP P WEXIT
05:55 - 06:30 0.58 STWHIP P WEXIT
06:30 - 07:05 0.58 DRILL P PROD1
07:05 - 07:45
0,67 DRILL P
PR001
07:45 - 07:55
0.17 DRILL P
PR001
07:55 - 09:00
09:00 - 09:45
1,08 DRILL P
0,75 DRILL P
PROD1
PR001
09:45 - 10:10
0.42 DRILL N
OFAL PR001
Page 4 of15
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Description of Operations
shavings.
OOH. P/U crayola and 1.75 Weatherford motor.
SWS computer kept crashing. Time to defrag hard disk prior to
RIH.
RIH with BHA #7. Crayola Mill and 1.75 deg motor to dress
window.
Kick on pumps, 1.5/1,5/3360 psi. Orient BHA to window
orientation 150R.
Dress window with crayola mill. Tagged up at 9623', Mill down
from 9620'.
Orient back around to 162R.
Dress Window.
Orient around. Mill keeps getting bites, and flopping over to
140L. Need to orient around to 170R again.
Dress window to 9622.0'.
Work on a burr at 9623.2' 1.5/3360/170L
9624.0' Appears the worst is past. Ease in hole. Pump 20 bbl
bio pill followed by used Flo Pro mud
Another burr at 9624.7'-get to 9624.8'
Mill a burr at 9624.8' 1.5/3350/170L. Hole completely
displaced
Orient around
Continue milling burr at 9624.8' 1.5/3350/170R
9625.8' Out of window. Ream open hole w/ 300 diff and
stacking 5k to 9628.7' (assume mill is still full gauge)
Ream/backream window area at 154L and 145R. Sperry tool
cutting out on last pass. Dry tag, clean
POOH for drilling assy
LD milling BHA. Mill recovered in gauge. 2.74".
Make up build section BHA. BHI motor, Hughes 2.70"x3.0" Bi
center bit.
***************************U S E CA UTI 0 N
HE RE************************************
First Hughes bit made up by DO was the old style 2.75"x3.0",
It would not pass a 2.75" sleeve after being made up. Lots of
these bits are still out there ready to be a cork in a bottle on
small windows. Need to be sure to use the smaller pass thru
bits.
RIH with BHA # 8, Hughes bi center bit, Sperry orienter. Note,
Sperry MWO tool was intermittant on last run, Same tool has
been run back in the hole at Sperry's reccommendation, They
suggest it is the best option with the tools currently on the
slope,
Shallow hole test of sperry orienter and MWO tools at 3200' (10
Oeg inclination), All passed ok,
Continue RIH.
Make tie in pass up from 9515'. Sperry MWD tool not starting
on bottom. Same symptoms we observed yesterday. Had to
bounce BHA around to get it to work, Log pass up from 9515',
made +1' correction.
RIH thru window clean, tag bottom at 9629', pick up and catch
3 clicks, Pumps back up, and Sperry tool is not working again,
I Tag bottom and mess about with bit in open hole trying to get it
I
Printed: 7/10/2002 12:18:31 PM
')
')
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From"" To Hours Task Code NPT Phase
6/21/2002
09:45 -10:10
0.42 DRILL N
OFAL PROD1
10:10 -10:20 0,17 DRILL N DFAL PR001
10:20 - 10:40 0.33 DRILL N OFAL PR001
10:40 - 12:05 1.42 DRILL N OFAL PR001
12:05 -12:15 0.17 DRILL N DFAL PR001
12:15-12:35
0.33 DRILL N
DFAL PR001
12:35 - 12:50 0.25 DRILL N DFAL PROD1
12:50 - 14:10 1.33 DRILL N OFAL PROD1
14:10-15:00 0.83 DRILL N DFAL PR001
15:00 - 16:45 1,75 DRILL N OFAL PR001
16:45 - 19:00 2.25 DRILL P PROD1
19:00 - 23:45 4.75 DRILL P PROD1
23:45 - 00:00 0.25 DRILL P PROD1
6/22/2002 00:00 - 00:45 0.75 DRILL P PR001
00:45 - 01 :30 0.75 DRILL P PR001
01 :30 - 02:00 0.50 DRILL P PR001
02:00 - 03:30 1.50 DRILL P PR001
03:30 - 06:30 3.00 DRILL P PR001
06:30 - 08:10 1,67 DRILL P PROD1
08:10 - 08:30 0,33 DRILL P PR001
08:30 - 08:35 0,08 DRILL P PR001
08:35 - 10:00 1.42 DRILL P PR001
10:00 - 11 :00 1.00 DRILL P PR001
11 :00 - 12:00 1,00 DRILL P PR001
12:00 - 13:00 1,00 DRILL P PR001
13:00 -14:00 1.00 DRILL P PROD1
Page 5 of 15
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Description of Operations
to work with no success. Pick up into casing and it worked
fine. Run back to open hole, and Sperry tool doesn't work
again. Tag bottom for 2nd time and it finally kicked on.
$#@$%^&%$%.
MWO tool working, drill ahead from 9629'. Free spin 3060 psi.
1.4/1.4/3220 psi. 45 fph, TF=136L.
9634', Orient around.
Resume drilling, TF120L.
9669', MWO tool not getting good detection. Not able to see
tool face or get a survey at this time. Carry on drilling blind,
assuming TF is where we left it. Will need surveyor confirmed
tool face by 9680'.
9675', MWO not detecting properly. Signals from downhole
Keep dropping out, and when working are too weak. Mess
about as before to try to get it working. Cycle pumps, pull
up/down, tag bottom, etc.
MWD mysteriously started working again. Carry on drilling.
9679', MWD down again. Enough of this messing about.
POOH to change out MWD tool.
Tag up at surface, swap out MWD tool. Check bit. Bit shows
no wear, no chipped cutters. MU injector.
RIH with same 2,12 deg build section motor and, Hughes bi
centered bit, and a new Sperry MWD probe and pulser.
Shallow test at 500', ok.
RIH thru window slick, kick on pumps. TF=78L. Free spin
3000 psi at 1.5 bpm. 100% returns. RIH to tag up, subtract
3.0', resume drilling at 9679'.
Drill and orient from 9710' 1.5/31 00/70L PVT 333. Drill to 9787'
Orient around
Continue orient around-only getting 10 deg/click
Drilling from 9787' 1.5/3350/1 OOL PVT 329
Drilling from 9798' 1.5/3050/1 OOL (lost 300 psi). Drill to 9801'
and motor stalls too quick. Assume washed out bleed sub or
weak motor
PTOH
OOH. Nothing obviously amiss. Check MWD screen and
clean. WO motor. Change motor and orientor
RIH w/ BHA #10. Shallow hole test of MWD and orienter at
3200', passed ok,
log tie in pass up, Make -3' correction,
RIH, resume drilling. Geo reports last cutting samples showed
60-70% chert. Expect hard drilling.
Resume drilling from 9801 '. Free spin 3150 psi, 1.5/1,5/100%
returns. TF= 67L. Drilling at 3520psi. ROP very slow. Geo
indicates we should be in chert to about 9960' MO,
9805', (Made 4.0'), Hard drilling. 1,5/1,5/3300psi. TF=67L, Pit
Vol=328 bbls.
9809,6', (Made 4.6'), Hard drilling. 1.5/1.5/3290 psi, TF=78L,
Pit Vol=328 bbls,
9812.1', (Made 2,5'), Hard drilling, 1,5/1.5/3380 psi, TF=73L,
Pit Vol=327 bbls,
9816,9', (Made 4,8'), Hard drilling, 1,5/1,5/3340 psi, TF=67L,
Pit Vol=326 bbls.
Printed: 7/10/2002 12:18:31 PM
)
)
Page 6 of 15
BP EXPLORATION
Operations Summary..Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Hours Task Code NPT Phase
Description of Operations
6/22/2002 14:00 - 15:00 1.00 DRILL P PR001
15:00 - 16:00 1.00 DRILL P PROD1
16:00 - 16:50 0.83 DRILL P PROD 1
16:50 - 17:45 0.92 DRILL N DFAL PROD1
17:45 - 18:10 0.42 DRILL P PR001
18:10 - 20:00 1.83 DRILL P PR001
20:00 - 21 :35 1.58 DRILL P PR001
21 :35 - 00:00 2.42 DRILL P PR001
6/23/2002 00:00 - 01 :30 1.50 DRILL P PROD1
01 :30 - 01 :40 0.17 DRILL P PR001
01 :40 - 03:10 1.50 DRILL P PR001
03: 1 0 - 03:45 0.58 DRILL P PROD1
03:45 - 03:55 0.17 DRILL P PR001
03:55 - 05:05 1.17 DRILL P PR001
05:05 - 06:10 1.08 DRILL P PROD1
06:10 - 07:50 1.67 DRILL P PROD1
07:50 - 08:15 0.42 DRILL P PROD1
08:15 - 09:00 0.75 DRILL N OFAL PR001
09:00 - 09:20 0.33 DRILL P PROD1
09:20 - 10:00 0.67 DRILL P PR001
10:00 - 11 :00 1,00 DRILL P PR001
11:00 -12:00 1.00 DRILL P PROD1
12:00 -13:15 1,25 DRILL P PR001
13:15-13:40 0.42 DRILL P PR001
13:40 - 14:15 0.58 DRILL P PROD1
14:15 - 15:50 1.58 DRILL P PR001
9820.8', (Made 3.9'), Hard drilling, 1.5/1.5/3320 psi, TF=67L,
Pit Vol=325 bbls.
9827.4', (Made 6.6'), Hard drilling, 1.5/1.5/3250 psi, TF=67L,
Pit Vol=327 bbls.
9832.4', (Made 5.0'), Hard drilling, 1.5/1.5/3210 psi, TF=67L,
Pit Vol=327 bbls.
9840.5', (Made 8.1' in last 45 minutes) ROP picking up slightly.
Sperry surveys look questionable. Last one gave a dogleg of
70 deg/100', Pickup to recheck to the casing shoe, Checked
4 surveys, Found azimuth repeatability of from 1 to 9 deg, Not
acceptable, Re survey on way back in the hole. At low pump
rates the 2nd and third surveys seem to agree. Which one do
you believe?
Orient around to 70L.
9840.5', Resume drilling.
9850.0'
9861.6' Survey at 0.8 bpm. Continue painfully slow drilling in
22 1.5/3100/90L to 9877'
Continue slow drilling in cherty 22 from 9877' using suspect
surveys showing more turn than plan
Wiper to window
POOH for lesser bend motor, MWO probe and bit check. Plan
to land in transition above HOT @ 10090' MD
LO drilling BHA. Bit 2-2-1
Safety mtg re: cut CT, weld-on CTC
Cut off CTC. Cut off 200' CT to manage life. Weld on CTC,
PT 32k, 3500 psi
MU drilling BHA w/ new MHA
RIH w/ BHA #11 (1.5 deg motor)
Log tie in pass accross RA pip tag at 9626'. Make -1.5'
correction.
Repeat open hole directional surveys. Using different MWO
probe than was used on previous runs. These surveys agree
with the ones taken yesterday with the first MWD tool, but only
when it was operated at 0.8 bpm. Future surveys with this tool
will need to be performed when pumping at less than full rate.
Surveys taken while drilling can not be trusted at this time.
Orient to high side.
9886.7', Resume drilling hard formation. Free spin 3100 psi.
1.5/1.5/3200 psi, 100% returns, 328 bbls pit vol.
9889.0', Drilling chert. Free spin 3000 psi. 1.5/1.5/3100 psi.
100% returns. 328 bbls pit volume,
9897.1', (Made 8.1' in last hour) Geo reports 60-70% chert in
samples, trace of pyrite, 1,5/1.5/3100 psi. 100% returns, 327
bbls pit volume.
9903,2', (Made 6,1' in last hour). ROP is unacceptable, POOH
to pick up new bit. Will attempt a Hycalog bit this time around.
200', Fire drill, rig evacuation, and safety debrief,
Tag up at surface, Change out bits from Hughes bi center to
Hycalog bi center. Hughes bit in good shape. Graded 2/2,
Rest of BHA remains the same.
RIH with BHA #12 to finish build section, Hycalog bicenter bit,
1,5 deg motor.
¡
I
Printed: 7/10/2002 12: 18: 31 PM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Page 7 of 15
OperationsSu m maryReport
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
6/23/2002
15:50 -16:10
From - To Hours Task Code NPT Phase
PROD1
16:10 -18:00
18:00 - 19:00
19:00 - 19:40
19:40 - 20:10
20:10 - 21 :40
21 :40 - 23:20
6/24/2002
23:20 - 00:00
00:00 - 01 :00
01 :00 - 01 :20
01 :20 - 01 :45
01 :45 - 02:30
02:30 - 03:25
03:25 - 03:40
03:40 - 04:55
04:55 - 05:30
05:30 - 08:30
08:30 - 10:30
10:30 - 15:00
15:00 - 16:10
16:10 - 17:50
17:50 - 18:30
0.33 DRILL P
1.83 DRILL P
PROD1
1.00 DRILL P
PR001
0.67 DRILL P
0.50 DRILL P
PR001
PR001
1.50 DRILL N
1.67 DRILL N
DFAL PROD1
PROD1
0.67 DRILL N
1.00 DRILL N
0.33 DRILL N
PROD1
OFAL PROD1
PROD1
0.42 DRILL N
0.75 DRILL P
PROD1
PROD1
0.92 DRILL N
DFAL PROD1
0.25 DRILL P
PROD1
1.25 DRILL P
0,58 DRILL P
3.00 DRILL P
PR001
PROD1
PROD1
2,00 DRILL N
SFAL PR001
4.50 DRILL P
1,17 DRILL P
PR001
PR001
1.67 DRILL P
0.67 DRILL P
PROD1
PR001
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Description of Operations
Tag up, make -6' correction to last tag, kick on pumps. Free
spin=3000 psi. Orient to high side.
9903', Resume drilling. Tag bottom, stall twice, then took off.
Finally getting decent ROP! Drilling ahead at 45 fph. Plan
forward is to drill to land well, then recheck survey azimuths.
1.5/1.5/3200 psi, 328 bbls pit vol. TF=16L.
Geo caught sample from just starting drilling on this run
(9903'), Chert=50%.
Geo caught sample 3' later. Chert=5%.
Is our faster ROP due to bit or formation changes?
9993', update at 18:00. 1.5/1.5/3400 psi. Not as many stalls
now, and ROP increasing. Up to 90 fph now. Pit vol=329 bbls.
10020' Work thru a shale from 10008' 1.4/3040/1 L PVT 329
10060' Still in shale, a little sticky. Wiper to window. Overpull
at 9690' and motor stalled. RIH w/ motor stalled. Work
between 9700 and 9800' to get rid of assumed debris on bit w/o
success. PUH thru window, clean, but motor still pressured up
POOH to check bit/motor
Found motor locked up (shop teardown found that matrix
coating on drive sub peeled off and locked up bearing section),
all other tools ok, Check MWO probe for centralizer loss and
pulser screen was clean. WO motor. MU same bit, new motor
RIH w/ BHA #13 (1.8 deg motor, same HYC bit)
Continue RIH w/ BHA #14
RIH thru window, clean. Precautionary ream to TO
1.5/3250/140L
Orient to HS
Drilling 1.5/3250/4L finishing build. Sticky at times due to diff.
Drill to 10107' and see 86 deg-good enough for this motor. SS
tool also starting to work intermittent. Will land as planned in
transition zone above HOT at 8970' TVO. Will need to come
up to 8950' TVO to drill target sand
Wiper to window performing check shot surveys at red rate (0.8
bpm). All match drilled surveys
Fin wiper to window. Test MWD in tbg and working
intermittent. Assume solenoid problem again
POOH for lateral assy
LO drilling BHA
Weekly BOPE test. Witness waived by AOGCC. All passed
ok.
Sperry troubleshot equipment during BOP test. No problems
found with downhole eq.
Eaualizer port on TOT BOP's leaking during body test. Call for
new parts from Oeadhorse. Chase threads and replace valve.
BOP test completed. All passed ok.
Make up BHA #14, RIH with 1,1 deg motor and Hycalog bi
center bit to drill lateral section.
RIH with BHA #14,
Log tie in pass, Sperry MWO tool not working in high dog leg
section near window, Pull up until it works, Log tie in pass
Printed: 7/10/2002 12:18:31 PM
')
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Date From- To Hours Task Code NPT Phase Description of Operations
6/24/2002 17:50 - 18:30 0.67 DRILL P PR001 over RA tag. Make -2' correction.
18:30 - 18:45 0.25 DRILL P PROD1 RIH and tag TO at 10113'
18:45 - 19:30 0.75 DRILL P PROD1 Drill from 10113' 1.5/3200/81 L
19:30 - 20:30 1.00 DRILL P PR001 Stacking and stalling and occasional good overpull from 10170'
while building angle to intersect target sand at 10350' as
requested via email
20:30 - 21 :30 1.00 DRILL P PR001 Orient around from 10185', Getting 10 deg/click no matter how
many are done-orientor in fail-safe mode
21 :30 - 22:20 0.83 DRILL P PR001 Drill from 10185' 1.5/3450/90L and get drilling break at 10193'.
Drill to 10204'. 100' wiper. Drill to 10236' and stacking wt
22:20 - 22:45 0.42 DRILL N STUC PROD1 PUH and were stuck w/ motor stalled. Circ OH clean. SD
pump w/ stacked wt
22:45 - 23:00 0,25 DRILL P PROD1 Pull free at max pull. Wiper to window
23:00 - 23:35 0.58 DRILL P PR001 Log tie-in, up from 9660' (SS tool not working until 9652'). Got
a bad data pt which confused the issue. Sort out and add 7.0'
23:35 - 00:00 0.42 DRILL P PR001 RBIH, clean. Tag TD at 10236' w/ TF @ 50L
6/25/2002 00:00 - 00:45 0.75 DRILL N STUC PR001 Tag TO at 10236'. Orient around (lost TF when stuck). Getting
10 deg/click
00:45 - 01 :40 0.92 DRILL N STUC PR001 Start to drill and stuck again! Park w/ sli bind. Circ new mud to
bit. Pull free w/ 20K over. GR subsequently showed hi perm
sand at 10222'
01 :40 - 03:10 1.50 DRILL P PROD1 Resume drilling while finishing swap to new mud
1,5/3140/109L. Drill to 10317' and building angle w/ avg 105L
03:10 - 04:15 1,08 DRILL P PROD1 Orient around. Still 1 0 deg/click
04: 15 - 04:45 0,50 DRILL P PROD1 Drill from 10317' 1.5/3130/172R working back thru 14N shale
04:45 - 05: 1 0 0.42 DRILL P PROD1 Drill from 10350' 1.5/3150/90L in target sand 120-150'/hr. Drill
to 10400' (8956' TVO) at 90.5 deg PVT 233
05:10 - 05:35 0.42 DRILL P PROD1 Wiper to window
05:35 - 05:55 0.33 DRILL P PR001 Tie-in from 9660' logging up (SS tool not working until 9657'),
add 3.0'
05:55 - 06:20 0.42 DRILL P PROD1 RBIH
06:20 - 07:00 0.67 DRILL P PR001 Orient around. TF now at 40L, need 120L. Orienter only giving
us 10 deg clicks.
07:00 - 07:10 0.17 DRILL P PROD1 10400', Resume drilling 1.4/1.4/3500 psi. Free spin=3200 psi.
TF114L.
07:10 - 07:20 0.17 DRILL P PROD1 Need to catch a couple more clicks to take care of reactive.
07:20 - 07:40 0.33 DRILL P PROD1 Resume drilling. 1.4/1.4/3600. ROP=85 fph. Pit Vol=226 bbls,
String wt=1 Ok, WOB=2500 Ibs.
07:40 - 08:00 0.33 DRILL P PROD1 Orient to 50R. Orienter still giving 10 deg clicks, slow process.
08:00 - 08:25 0.42 DRILL P PROD1 10445', Resume drilling.
08:25 - 09:50 1,42 DRILL P PROD1 10470', orient to 70R.
09:50 - 10:40 0,83 DRILL P PROD1 10550', Wiper trip to the window. Reasonably clean PU off
bottom at 26klbs.
10:40 - 11 :00 0.33 DRILL P PR001 Back on bottom drilling. 1.4/1.4/3450. Pit Vol=218 bbls.
Appear to be loosing a little mud.
11 :00 - 11 :50 0.83 DRILL P PROD1 10597', Orient to 135 R. Orienter only giving 10 deg clicks, Try
drilling, and end up getting 180 deg of reactive. Having to
make several attempts to account for the reactive, Tag/drill,
PU, orient, repeat, repeat. 10 degree orienter makes orienting
slower. Fast ROP drilling makes it easy to drill at the wrong
tool face,
11 :50 - 12:20 0,50 DRILL P PR001 Resume drilling 1.5/1,5/3800 psi, 216 bbls pit volume. Free
I spin 3300 psi.
Printed: 7/10/2002 12:18:31 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
Operations Summary Repo.rt
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
6/25/2002
12:20 - 12:50
From- To Hours Task Code NPT Phase
PR001
12:50 - 13:00
13:00 - 13:05
13:05 - 13:25
13:25 - 13:35
13:35 - 14:00
14:00 - 14:30
14:30 - 14:55
14:55 - 15:03
15:03 - 15:25
15:25 - 16:05
16:05 - 16:30
16:30 - 17:00
17:00 - 17:45
17:45 - 18:30
18:30 - 18:50
18:50 - 19:15
19:15 - 19:30
19:30 - 19:45
0.50 DRILL P
0.17 DRILL P
PR001
0.08 DRILL P
PR001
0,33 DRILL N
STUC PR001
0.17 DRILL N
STUC PR001
0.42 DRILL N
STUC PROD1
0.50 DRILL N
STUC PROD1
0.42 DRILL N
0,13 DRILL N
STUC PROD1
STUC PR001
0.37 DRILL N
STUC PROD1
0.67 DRILL N
STUC PROD1
0.42 DRILL P
PR001
0,50 DRILL P
0,75 DRILL P
0,75 DRILL P
0,33 DRILL P
PROD1
PROD1
PR001
PROD1
0.42 DRILL P
PR001
0,25 DRILL P
PR001
0,25 DRILL P
I
PROD1
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Description of Operations
10644', There is a question about the surveys again.
ReSurvey the last 100' of hole at 0.8 bpm. TVD depth at
current TO appears to be 8944'! Plan was to keep it between
8953-8957'. Orient around to straight down.
Resume drilling. Holding TF=180, Not getting huge reactives
now, only 20-30 deg.
10668', Attempt to get survey right on bottom. Yo-yoing pipe
Pumping 0,8 bpm.
10657', Stacking weight on last yo-yo down. Make PU, and are
stuck, probably differentially, and probably 10' off bottom. Pull
max, and can't get free. SI pumps, attempt relax technique.
No luck. Pull max after 15 minutes. No success. Continue to
work pipe.
Kick pumps on. Took 2 bbls to get full returns. Pit level at
13:25=211 bbls. Pumping 1.2 bpm, CTP=3500 psi.
10657', SI pumps. Try relax method again. Slack off to 9000#
string wt. (Neutral Wt) Call for crude transport. No luck pulling
free. Pull to 62klbs 3 times.
Kick pumps on, 1.4 bpm, 3900 psi. Held for 5 minutes, then
saw a drop in CTP to 3200 psi. at the same rate. Bit free?
Clear of packed off material? Work pipe, still stuck, Can't go
up or down. Continue to circulate. Bring rate up to 1.7 bpm,
getting 100% returns now, Circulate bottoms up.
Start pumping 20 bbls of 8% lubtex pill. Still waiting on crude.
OH displaced 5 bbls of slick mud. SI pumps and work pipe
several times with no success. Slack off to 0 string wt.,
resume pumping, pump remainer of slick sweep. 1.7 bpm,
3870 psi CTP.
Work pipe while pumping. No success. Pit level 206 bbls. Pull
up to 28klbs, SI pumps for 10 minutes. Work pipe, pull 50klbs,
bring pumps on. No success. rate 1.4 bpm, CTP=3900 psi.
Looks like we are packed off, or bit locked again. Continue
pumping.
Crude transport on location. Continue to pump mud while
hooking up crude. After 5 minutes pressure started to drop off
back to free spin. Pump 10 bbls crude. (Open hole vol=5
bbls). Follow with mud. New pit volume=218 bbls, Pressure
back up. CTP=4015 @ 1,5 bpm. Note-crude in coil. Also note
- TF hasn't moved at all. We have cycled CTP numerous times
with no change in TF.
Pulled free, wiper trip to shoe. Circ. out 10 bbl crude pill and
discard a total of 46 bbls contaminated FloPro / crude.
Logged tie-in with GR. Added 7 ft to CTO,
RIH to TO, Tag TO at 10,672 ft,
Orient TF to 100R.
Drill to 10688' @ 105R TF, 1,5/1.5bpm, 3600/4000psi, 2k
WOB, & 39fph ave ROP.
Drill to 10703' @ 120R TF, 1,5/1.5bpm, 3600/4000psi, 2k
WOB, & 41fph ave ROP,
Drill to 10736' @ 120R TF, 1,5/1,5bpm, 3600/4000psi, 2k
WOB, & 94fph ave ROP.
Drill to 10753' @ 127R TF. 1.5/1,5bpm, 3600/4000psi, 2k
WOB, & 85fph ave ROP. Getting better MWO pulses while
Printed: 7/10/2002 12:18:31 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
)
)
BP EXPLORATION
Operations Summary Report
Page 10 of 15
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Date From - To Hours Task Code NPT Phase Descriptiohof Operations
6/25/2002 19:30 - 19:45 0.25 DRILL P PR001 drilling on btm than while off btm. Take on additional 1 OObbls of
fresh FloPro mud.
19:45 - 21 :00 1.25 DRILL P PR001 Attempt to orient TF around to 90R - can't estimate correct
clicks, TF @ 140R. Continue orienting again while moving pipe.
Decide to orient to 90-1 OOL.
21 :00 - 21 :25 0.42 DRILL P PR001 Drill to 10775' @ 90-1 OOL TF, 1.5/1,5bpm, 3550/3950psi, 2k
WOB, & 30fph Rap,
21 :25 - 21:40 0.25 DRILL P PR001 Drill to 10784' @ 90-100L TF, 1.5/1.5bpm, 3550/4040psi, 3k
WOB, & 36fph Rap. Wt stacking.
21 :40 - 22:50 1.17 DRILL P PR001 Wiper trip to window. 27k up wt. RBIH to btm 12k down wt.
22:50 - 23:00 0.17 DRILL P PR001 Orient to 80-90L & drill blind to 10790' @ 1,5/1.5bpm,
3550/4000psi, 3k WOB, & 36fph ave Rap.
23:00 - 23:25 0.42 DRILL P PROD1 Orient 3 clicks & drill to 10803' @ 90L TF, 1.5/1.5bpm,
3550/4000psi, 3k WOB, & 28fph ave Rap.
23:25 - 00:00 0.58 DRILL P PR001 Orient 3 clicks & drill to 10828' @ 45L TF, 1.5/1.5bpm,
3550/4000psi, 3k WOB, & 60fph ave Rap. MWO tool not
getting good surveys. Try pumping @ 1.4bpm and finally got a
good survey.
6/26/2002 00:00 - 00:45 0.75 DRILL P PR001 Drill to 10864' @ 30-45L TF, 1.5/1.5bpm, 3550/4000psi, 3k
WOB & 47fph ave Rap. Geologist seeing some good sand
samples, Estimate 90degs @ the bit. Would try to hang-in the
good stuff.
00:45 - 01 :20 0.58 DRILL P PROD1 Orient TF to 1 OOL.
01 :20 - 01 :55 0.58 DRILL P PR001 Drill to 10897' @ 90-1 OOL TF, 1.3/1.3bpm, 3220/3750psi, 3k
WOB & 55fph ave Rap.
01 :55 - 02:15 0.33 DRILL P PR001 Drill to 10905' @ 125L TF, 1.3/1.3bpm, 3220/3750psi, 3k WOB
& 29fph ave Rap. Stacking wt.
02: 15 - 02:25 0.17 DRILL P PR001 Short wiper to 10820'.
02:25 - 02:30 0.08 DRILL P PROD1 Drill to 10915' @ 120L TF, 1.3/1.3bpm, 3220/3750psi, 3k
WOB. Still wt stacking. Pull heavy.
02:30 - 03:45 1.25 DRILL P PR001 Wiper to 9680'. Hole clean. RBIH to btm.
03:45 - 03:55 0.17 DRILL P PROD1 Drill to 10921' @ 120-130L TF, 1.3/1.3bpm, 3220/3650psi, 3k
WOB & 32fph ave Rap.
03:55 - 04:15 0.33 DRILL P PR001 Orient 3 clicks & drill to 10944' @ 1 OOL TF, 1.3/1.3bpm,
3220/3800psi, 3k WOB & 49fph ave ROP. MWD tool not
getting any TFs & surveys - seems to always malfunction after
every wiper trip.
04:15 - 04:30 0,25 DRILL N OFAL PR001 Troubleshoot parameters to see if MWD survey data will
improve - No luck, Need to confirm TFs & surveys & can't drill
blind. Also MWO battery life expected to runout @ 10:00 hrs.
Thus decide to POOH to C/O BHA.
04:30 - 06:30 2.00 DRILL N OFAL PR001 POOH for BHA C/O,
06:30 - 08:15 1,75 DRILL N DFAL PR001 C/O entire BHA except for bit. Found upper 2 Sperry MWD
rubber centralizers were fluid cut and mostly missing. M/U
new 1,1 deg motor and Re-run Hycalog bi-center bit.
08:15 - 08:30 0.25 DRILL P PR001 SAFETY MEETING, Reviewed last 3 drilling department
incidents, Discussed staying alert and being properly trained
for special rig operations,
08:30 - 09:30 1,00 DRILL N DFAL PR001 RIH with MWO BHA #15, 1.1 deg motor, Bit #15 RR, Hycalog
2.7 x 3,0" bi-center bit.
Shallow test Sperry tools, Not able to orient.
09:30 - 10:30 1.00 DRILL N OFAL PR001 POOH for another orienter. Rig on down time,
10:30-11:00 0.50 DRILL IN OFAL PR001 C/O Sperry Orienter with another Sperry Orienter.
Printed: 7/10/2002 12:18:31 PM
)
)
BPEXPLORA TION
Operations Summary R~port
Page 11 of 15
Legal Well Name: G-10
Common Well Name: G-10 Spud Date: 3/27/1981
Event Name: REENTER+COMPLETE Start: 6/12/2002 End: 6/30/2002
Contractor Name: NORDIC CALISTA Rig Release: 6/30/2002
Rig Name: NORDIC 1 Rig Number:
From- To Hours Task Code NPT Phase Description of Operations
6/26/2002 11 :00 - 11 :30 0.50 DRILL N DFAL PROD1 RIH and test orienter. Tested OK. Getting good signal from
Sperry tools. Rig off down time. 2 hours down time.
11 :30 - 13:00 1.50 DRILL N OFAL PROD1 RIH with lateral MWD BHA #15.
13:00 - 13:30 0.50 DRILL N OFAL PROD1 Attempt to log GR tie-in. Sperry pulser not giving a useable
signal. Surge pumps, pull into tubing, surge pumps. No Luck.
Sperry does not have another working pulser. Call for BHI
MWO equipment and personnel.
13:30 - 14:45 1.25 DRILL N DFAL PROD1 POOH to change out MWD tools.
14:45 - 15:30 0.75 DRILL N OFAL PR001 LlO Sperry MWD tools.
15:30 - 17:30 2,00 DRILL N OFAL PR001 R/U BHI MWO trailer, surface equipment and MWD BHA.
17:30 - 19:00 1.50 DRILL N OFAL PR001 M/U BHI MWD BHA #16 with 1.1 deg motor and Bit #16 RR,
Hycalog 2.7 x 3.0" bi-center bit.
19:00 - 20:45 1,75 DRILL N OFAL PROD1 RIH with BHA #16 & SHT tools @ 2750' & orienter @ 4000'.
Sync MWD & obtain good TF readings for different clicks. Set
depth encoder
20:45 - 22:00 1,25 DRILL N OFAL PROD1 Continue RIH to 9660'.
22:00 - 22:50 0.83 DRILL N OFAL PROD1 Log-up GR & tie-into RA tag @ 9626'. Subtract 3' ftom CTO.
22:50 - 23:45 0.92 DRILL N DFAL PROD1 Continue RIH & set down in shale @ 10330' - 10370'. Ream
thru @ original TF & continue RIH to TO tagged @ 10943'.
Observe BHI azimuth surveys at TD to be +/-50 degs off from
Sperry surveys.
23:45 - 00:00 0.25 DRILL N DFAL PR001 Resurvey check shots.
6/27/2002 00:00 - 00:40 0.67 DRILL N DFAL PR001 Resurvey check shots @ 10892.71' & 10856,76' - observe
consistent azm readings with Sperry surveys. Troubleshoot &
discover that BHI system was corrupted while importing Sperry
ASCII survey data leading to the initial 50degs azm swing.
Shoot & confirm with 2 more consistent check shots @
10752.69' & 10603.46'.
00:40 - 00:50 0.17 DRILL N DFAL PROD1 RBIH to btm to resume drilling.
00:50 - 02:30 1.67 DRILL P PROD1 Orient 3 clicks & drill shale to 10998' @ HS-15L TF,
1.5/1.5bpm, 3200/3500psi, 3k WOB & 26fph ave ROP.
02:30 - 04:10 1.67 DRILL P PROD1 Orient around & drill to 11025' @ 90L TF, 1.5/1.5bpm,
3250/3550psi, 3k WOB & 40fph ave ROP.
04: 10 - 04:45 0.58 DRILL P PR001 Orient & drill shale to 11049' @ HS TF, 1.5/1.5bpm,
3350/3700psi & 35fph ave ROP.
04:45 - 06:00 1.25 DRILL P PROD1 Orient around & drill to 11080' @ 75-90L TF, 1.5/1.5bpm,
3150/3550psi, 3k WOB & 45fph ave ROP. Occasional wt
stacking,
06:00 - 07:10 1,17 DRILL C PROD1 Drilling, 1.5/1,5 bpm, 3300 / 3600 psi, 40 fph, TF = 170R,
Trying to reduce incl to stay in target sand, Drilled to 11,100 ft.
07:10 - 09:00 1,83 DRILL C PROD1 Wiper trip to window. Motor work at 10320'. Clean to window.
RIH, Ream down at 10 fpm across 10,315-10,330 ft. RIH
clean to TO.
09:00 -10:15 1,25 DRILL C PROD1 Drilling, LS TF to reduce incl. 1.5 /1.5 bpm, 3200-3700 psi,
Swap well to new FloPro Fluid. Saw 200 psi drop in circ press
and 2K less up wt. Up wt = 24K, Dwn wt = 11 K, Drilled to
11 ,130 ft.
Last 2 surveys project bit at 88 deg, Incl.
10:15 - 10:40 0.42 DRILL C PR001 Orient TF around to 70R.
10:40 - 12:20 1,67 DRILL C PROD1 Drilling, 1.5/1,5 bpm, 3100 - 3500 psi, TF = 80R, slow ROP
after TF change at 11130 ft. Drilled to 11,150 ft, Stacking wt.
Backream twice.
Printed 7/10/2002 12:18:31 PM
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
)
BP EXPLORATION
Operations Summary Report
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Page 12öf15
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Date From;. To Hours Task Code NPT Phase Description of Operations
6/27/2002 12:20 - 15:00 2.67 DRILL C PROD1 Drilling, 1.5/1.5 bpm, 3100 - 3500 psi, TF = 100-65R, Drill
with light WOB to keep out of CT lockup. Reduce pump to 1.4
bpm to get more WOB. Drilled to 11,195 ft.
15:00 - 16:15 1.25 DRILL C PROD1 Drilling, 1.5/1.5 bpm, 3100-3800 psi, TF = 75R, 90 deg incl.
Drilled to 11,240 ft,
16:15 - 17:00 0,75 DRILL P PROD1 Wiper trip to window. Motor work at 10,530 ft and
10,342-10,310 ft, The rest of hole was clean.
17:00 - 19:00 2.00 DRILL P PR001 Log Tie-in with RA tag at 9626'. Added 8 ft to CTO. Lost
power and depth info., re-tie-in & resubtract l' from CTO.
19:00 - 20:10 1.17 DRILL P PROD1 RBIH clean & set down with motor work @ 11150'. P/U & ream
thru @ original TF till TO tagged @ 11241'. O/P on P/U.
Backream to 11100' & ream down clean to TO again.
20: 10 - 23:00 2.83 DRILL P PR001 POOH driling BHA# 16. Observe motor work @ 10423'.
Backream & ream down clean once. Continue POOH. Paint
EOP flags @ 9400' & 7800' & POOH to surface.
23:00 - 00:00 1.00 DRILL P PROD1 LID driling BHA# 16.
6/28/2002 00:00 - 00:30 0.50 CASE P COMP PJSM & HA/HM for RIH liner completion.
00:30 - 03:30 3.00 CASE P COMP R/U, M/U & RIH 54 jts of 2-3/8" 4.7# L-80 STL with 1 P/jt,
O-ring sub, float equipment & turbos. Set 2-3/8" pipe slips &
pull test - OK.
03:30 - 06:45 3,25 CASE P COMP R/U 1" CSH handling tools. M/U & RIH 20' slick stick on 55 jts
of 1" CSH. Land slick stick no-go on ORS & space out slick
stick 4'/16' above/below the ORS. PlTest CSH x 2-3/8"
annulus.
06:45 - 07:30 0.75 CASE P COMP M/U BKR CTLRT and pull test. M/U CT to running tools. BHA
= 1743.3 ft.
07:30 - 09:00 1.50 CASE P COMP RIH with 2-3/8" liner on CT. Circ. at 0.4 bpm at 1700 psi. RIU
to pump cement job thru in-line high pressure screen. Stop at
flag, correct -14 ft CTO.
Up wt at 9550 ft = 30K, Dwn wt = 19K.
09:00 - 10:40 1.67 CASE P COMP RI thru window with no wt loss. RI open hole with liner. 70
FPM, 0.3 bpm, 1800 psi.
Saw small wt loss at shales at 10320, 10430, 10530 ft. Sat
down full wt twice in shales at 10980 ft. Break thru on third try.
RIH to 11140 ft and sat down several times. RIH to 11188 ft,
sat down many times. Work thru and landed liner at TD at
11,241 ft. Circ. FloPro at 0.8 bpm, full returns. Circ. 1,1 bpm,
full returns, eire, 1.3 bpm at 4000 psi, full returns.
10:40 - 13:30 2.83 CASE P COMP Insert 5/8" steel ball. Displace with FloPro. Ball on seat at 36
bbls. released from liner at 3800 psi. Pick up, Liner was free,
Set down wt to 11241 ft. Displace well to 2% KCL water with
friction reducer. 1.2 bpm to start, increase to 1.5 bpm with slick
KCL water out shoe. Returns of 80% with KCL water across
formation at 1.4 bpm. Clean rig pits and fill with KCL water.
13:30 - 15:00 1.50 CEMT N WAIT COMP Batch mix 12 bbl cement. Ran out of cement at 14 ppg. Bulk
truck did not have enough dry cement on board. Dump low wt
cement slurry and wait for cement bulk truck and mix water.
Circ, KCL water at 1,0 bpm, 0.8 bpm returns,
15:00-15:15 0,25 CEMT P COMP SAFETY MEETING: Reviewed cementing procedure and
hazards / mitigation.
15:15 - 15:30 0.25 CEMT P COMP Press test cement line with 4000 psi. OK.
15:30 - 16:40 1,17 CEMT P COMP Stage 14,7 bbls, 15,8 ppg, G Cement with latex, 1.4 bpm at
3500 psi.
Printed: 7/10/2002 12:18:31 PM
)
')
, /
BPEXPLORATION
Operations Summary Report
Page 13 of 15
Legal Well Name: G-10
Common Well Name: G-10 Spud Date: 3/27/1981
Event Name: REENTER+COMPLETE Start: 6/12/2002 End: 6/30/2002
Contractor Name: NORDIC CALISTA Rig Release: 6/30/2002
Rig Name: NORDIC 1 Rig Number:
From"'- To Hours Task Code NPT Phase Description. of Operations
6/28/2002 15:30 - 16:40 1.17 CEMT P CaMP Isolate reel. Flush lines.
Stage 5 bbls, 2% KCL water. Stage 15 BBL FloPro. Displace
with KCL water.
15 bbls displ, 1.2/1.0 bpm, 2150 psi.
23 bbls displ, 1.3 /1.0 bpm, 3250 psi.
27.9 bbls displ, Cement at shoe, zero out totalizer, 1.1 /0.6
bpm, 3650 psi,
32 bbls displ, 1,0/0,7 bpm, 4100 psi.
35 bbls, 0.8/0.7 bpm, 4070 psi,
38 bbls, 0.8/0.7 bpm, 4150 psi.
40.9 bbls, 0.7/0.65 bpm, 4230 psi. Stop pump at 40.9 bbls, 2
bbls underdisplaced.
16:40 - 18:00 1.33 CEMT P CaMP Sting out of back door flapper. Lay in 2 bbls cement inside
2-3/8" liner at 0.5 bpm, pull at 72 fpm up to 10750 ft. RIH
cleaning out cement 1.2 bpm, 2500 psi, 1.2/1.1 bpm, 90%
returns. Tag PBTD at 11,204 ft CTD. Circ. at 1.3 bpm at 2800
psi. Pull 500 ft. RIH and jet liner again to PBTD. POH while
circ at 1.3 bpm.
18:00 - 19:20 1,33 CEMT P CaMP Jet top of liner at 9501 ft. Flag pipe at 7800' EOP. Continue
POOH chasing contaminated cement out.
19:20 - 21 :00 1.67 CEMT P CaMP OOH. PJSM. LID LBRT, stand back 1" CSH & LID slick stick.
Meanwhile B/O & cleanout HP inline filter. Also take-on
additional 225bbls of KCL water.
21 :00 - 22:00 1.00 CEMT P CaMP M/U side jet nozzle & stab on well. Flush BOP stack. POOH
nozzle & SIB injector.
22:00 - 22:45 0.75 EVAL P CaMP R/U for logging job. Meanwhile prep 120k LSRV perf pill.
22:45 - 23:00 0.25 EVAL P CaMP PJSM on P/U & RIH MCNLlGR/CCL tools & 1" CSH.
23:00 - 00:00 1.00 EVAL P CaMP P/U & RIH SWS MCNLlGR/CCL BHA#18 on 1" CSH
workstring.
6/29/2002 00:00 - 00:45 0.75 EVAL P CaMP Continue RIH SWS MCNLlGR/CCL tools on 56 jts of 1" CSH
workstring. BHA OAL - 1744.95', M/U injector.
00:45 - 02: 1 0 1.42 EVAL P CaMP RIH BHA#18 to 3000' & calibrate logging depth counter.
Continue RIH to 9250'.
02:10 - 03:20 1.17 EVAL P CaMP Log down from 9250' to PBTO tagged @ 11208.3' @ 30fpm
while pumping down perf pill @ 0.4bpm/320psi. 12' deeper @
EOP flag (did not correct).
03:20 - 04:25 1.08 EVAL P CaMP Log up from 11208.3' to 9250' @ 30fpm while laying-in perf pill
@ 0.4bpm/900psi.
04:25 - 05:45 1,33 EVAL P CaMP POOH logging BHA#18
05:45 - 06:00 0.25 EVAL P CaMP PJSM for SIB 1" CSH,
06:00 - 07:00 1,00 EVAL P CaMP SIB 28 stands of 1" CSH
07:00 - 07: 15 0.25 EVAL P CaMP SAFETY MEETING, Review procedure, hazards / mitigation
for recovery of SWS memory CNUGR looging tools,
07:15 - 08:00 0,75 EVAL P CaMP Layout SWS memory logging tools. Good Data. TaL @ 9501'
& PBTO @ 11204',
08:00 - 09:00 1.00 PERF P CaMP Load 1.56" Power Jet perf guns in pipe shed. Total of 44 guns
/ blanks - 941,66',
09:00 -10:15 1.25 CEMT P CaMP Wait on cement. Cement in place at 16:40 hrs, 06/28/02,
10:15 -10:30 0,25 PERF P CaMP SAFETY MEETING. Reviewed procedure, hazards and
1.251 CEMT mitigation for running SWS 1,56" perf guns.
10:30 - 11:45 P CaMP Pressure test liner lap. Small leak, Bled from 2000-1600 psi in
20 minutes on first test and 2000-1420 psi in 30 min, on
second test. Liner lap PT failed,
I
Printed: 7/10/2002 1218:31 PM
Legal Well Name:
Com mon Well Name:
Event Name:
Contractor Name:
Rig Name:
)
')
BP EXPLORATION
Operations Summa-ryReport
Page 14 of 15
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Date From;;. To Hours Task Code. NPT Phase Description of Operations
6/29/2002 11 :45 - 13:30 1.75 PERF P CaMP M/U SWS 1.56" PowerJet perf guns and blanks. Loaded at 4
SPF as per program.
13:30 - 14:15 0.75 PERF P COMP M/U 31 jts, 1" CSH workstring and BKR MHA.
14:15 -16:10 1.92 PERF P COMP RIH with SWS 1.56" PJ perf guns on CT. Guns / Blanks total
length = 941.66 ft.
Total footage of perfs = 540 ft. BHA total length = 1894 ft.
Ran thru top of liner with no wt loss, Top of 2-3/8" liner at 9501
ft. Pump 15 bbl high vis FloPro pill to spot ahead of perf ball.
RIH and tagged PBTO at 11,201 ft. Corrected to 11,204 ft
BKB. [+3 ft].
16:10 - 16:40 0.50 PERF P CaMP Insert 0.50" Aluminium ball and displace with 2% KCL water.
Position bottom perforating charge at 11 100 ft. Ball on seat at
34.5 bbls. Firing head sheared at 3050 psi.
Pick up with no overpull. Up Wt = 27K.
16:40 - 17:30 0.83 PERF P CaMP POH with perf guns. No Fluid loss to formation. FloPro in liner.
POH to 3334 ft.
17:30 - 18:00 0.50 PERF N SFAL CaMP Found leak in 2" hardline at entry point to CT reel swivel.
Isolate leak. May need welded repair when CT pulled to
surface.
18:00 - 19:00 1.00 PERF P CaMP POH with CT, fill 3-1/2" tbg on backside with 2% KCL water
while POH.
19:00 -19:15 0,25 PERF P CaMP PJSM on LID 1" CSH.
19:15 - 20:30 1.25 PERF P CaMP LID 1" CSH, Meanwhile evaluate leaking hardline crack &
decide to swap out the entire drive shaft housing @ CT reel
swivel side. Mobilize spare from shop & crane. Should be able
to complete swap while LID 1" CSH & perf guns.
20:30 - 20:45 0.25 PERF P CaMP PJSM with all personnel for simops on LID perf guns &
swapping leaking reel hardline. Review HA/HM for planned
activities & trapped pressure incident on 15-31A. Only SWS
personnel to B/O guns & all non required personnel to stay
clear while LID guns.
20:45 - 23:00 2.25 PERF P CaMP LID perf guns. All shots fired. Load out guns. Meanwhile swap
out drive shaft housing with leaking hardline & install spare @
CT reel swivel side.
23:00 - 23:15 0.25 PERF P CaMP Fill hole with @ 2 bbls KCL water & R/U to LID remaining 1"
CSH on derrick.
23:15 - 00:00 0.75 PERF P CaMP LID 1" CSH from derrick.
6/30/2002 00:00 - 01 :45 1.75 PERF P CaMP Continue LID 1" CSH from derrick.
01 :45 - 02:00 0.25 RUNCOIVP CaMP PJSM on M/U & RIH Eclipse liner top Pkr.
02:00 - 02:20 0,33 RUNCOIVP CaMP M/U Eclipse liner top Pkr with running tool & seal assy on 1 jt of
2-1/16" CSH tbg,
02:20 - 02:30 0,17 RUNCOM'>J SFAL CaMP P/test CT reel hardline to 3600psi - OK.
02:30 - 04:25 1,92 RUNCOIVP CaMP RIH Eclipse Inr top Pkr assy to 9400'. Check up wt @ 27k, RIH
to ball drop position @ 9430',
04:25 - 04:55 0.50 RUNCOIVP CaMP Drop 1/2" phenolic ball. RIH & see seals going-in @ 9506'.
Sting in seals with 5k slack off wt @ 9509', Pump 4bbls @
0.6bpm/2800psi. Attempt to unsting to chase ball on seat -
O/P to 43k - seems Pkr was prematurely set possibly due to
debris on ball seat. Pkr is designed to set @ 2300psi
differential pressure,
04:55 - 05:50 0.92 RUNCOIVP CaMP Slack back 5k @ 9507' & P/test pkr elements via annulus to
2000psi - OK. Attempt to pump ball to seat by squeezing @
1,3bpm/3700psi. Squeeze pressure gradually decline to
Printed: 7/10/2002 12:18:31 PM
)
)
Pagé15 of 15
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Com mon Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
6/30/2002
G-10
G-10
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
From-To Hours Task Code NPT Phase
04:55 - 05:50 0,92 RUNCOIVP CaMP
05:50 - 07:00 1,17 RUNCOIVP CaMP
07:00 - 07:15 0.25 RUNCOIVP CaMP
07:15 - 07:30 0.25 RUNCOIVP CaMP
07:30 - 09:30 2.00 RIGO P CaMP
09:30 - 09:45 0.25 RIGO P CaMP
09:45 - 11 :00 1.25 RIGO P CaMP
11 :00 - 12:30 1.50 RIGO P CaMP
12:30 - 13:00 0.50 RIGD P CaMP
Start: 6/12/2002
Rig Release: 6/30/2002
Rig Number:
Spud Date: 3/27/1981
End: 6/30/2002
Description of Operations
2950psi (debris on ball seat blown away). Ball on seat @
38.6bbls away. Pressure CT to 3800psi & release running tool.
Top of liner top Pkr (Tal) @ 9498'.
POOH Inr top Pkr running assy. Hook-up to MeOH & start
displacing to BHA. Continue POOH to 2000'
Freeze protect 3-1/2" tubing with MEOH from 2000 ft to
surface. POOH.
layout Eclipse Packer running tools.
Blow down 2" coil with N2. Pump 30,00 SCF N2 with cool
down volume. Bleed off pressure in CT. Clean rig pits.
SAFETY MEETING. Review procedure, hazards and
mitigation for securing CT on reel for reel change out.
Pull CT onto reel and secure. Change out CT pack off.
Remove guide arch. Set injector in pipe bay.
Change out rams in BOP stack. N/D BOPE.
N/U Tree cap and pressure test.
RELEASED RIG AT 13:00 HRS, 06/30/02.
TOTAL TIME ON WEll WAS 13 DAYS AND 1 HOUR.
Prepare rig for derrick down rig move to OS 07 -13B,
Move will entail changing reels from 2" to 2-3/8" CT and
modifying injecter head after the rig in on OS 7.
Printed: 711012002 12: 18: 31 PM
)
)
llií.
BAICU.
HUGHlS
lNTEQ
ObP
BP
Baker Hughes INTEQ Survey Report
Company: BP Amoco
Field: Prudhoe Bay
Site: PB G Pad
Well: G-10
Wellpath: G-10B
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NA027 (Clarke 1866)
Sys Datum: Mean Sea Level
Field:
PB G Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0,00 ft
Site:
G-10
G-10
Well Position:
Well:
Date: 7/18/2002 Time: 14:55:42
Co-ordinate(NE) Reference: Well: G-10, True North
Vertical (TVD) Reference: 15: 106/3/199500:0070,3
Section (VS) Reference: Well (0.00N,O.00E,291.00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
Page:
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2002
5966832,87 ft
656301.39 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 18 58.211 N
148 43 59.013 W
True
1,19 deg
Slot Name:
10
+N/-S 2220.31 ft Northing: 5969085.95 ft
+E/-W 1605.07 ft Easting: 657859.77 ft
Position Uncertainty: 0.00 ft
Latitude:
Longitude:
70 19 20.046 N
148 43 12.169 W
Height 70.34 ft
Well path: G-10B
500292055302
Current Datum: 15: 106/3/199500:00
Magnetic Data: 5/22/2002
Field Strength: 57505 nT
Vertical Section: Depth From (TVD)
ft
0.00
Survey Program for Definitive Wellpath
Date: 7/18/2002 Validated: Yes
Actual From To Survey
ft ft
104.74 8204.74
8255.00 9620.00
9620.00 11241.00
1 : Sperry-Sun BOSS gyro multi
2 : MWO - Standard (1)
MWO
Annotation
MD TVD
ft ft
9620.00 8776.07 KOP
11241.00 9021.38 TO
Survey: MWO
Company: Baker Hughes INTEQ
Tool: MWO,MWO - Standard
Survey
MD Incl Azim TVD SSTVD
ft deg deg ft ft
9620,00 50.97 59,11 8776.07 8705.73
9640.74 40.61 59.00 8790.51 8720.17
9691.44 42,01 29.65 8828.96 8758.62
9721,54 36.91 14.00 8852.25 8781,91
9751,64 40,25 357,66 8875,83 8805.49
9781,61 45.44 343.77 8897.85 8827,51
9811,61 44,91 330.41 8919,05 8848,71
9843,26 50.71 318,28 8940,34 8870,00
9875,24 51.24 302,29 8960,55 8890,21
9906,09 55,72 299,65 8978,91 8908,57
9937.29 60,64 296,66 8995.36 8925,02
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
G-10A
9620.00 ft
Mean Sea Level
26.32 deg
80.81 deg
Direction
deg
291.00
Version:
Toolcode
2
Tool Name
BOSS-GYRO
MWO
MWO
Sperry-Sun BOSS gyro multishot
MWO - Standard
MWO - Standard
Start Date: 6/27/2002
Engineer:
Tied-to: From: Definitive Path
N/S EIW MapN MapE VS DLS
ft ft ft ft ft deg/10OO
-1213.45 -1944.89 5967831.95 655940,98 1380.85 0.00
-1205.82 -1932.15 5967839.85 655953,55 1371.69 49.95
-1182.36 -1909.40 5967863,78 655975.80 1358.86 38,07
-1164,78 -1902.21 5967881.51 655982.62 1358.45 37.03
-1146,24 -1900.42 5967900.08 655984,02 1363.42 35.53
-1126,25 -1903,80 5967919.99 655980,21 1373,74 35.88
-1106.74 -1912,04 5967939,32 655971.57 1388.42 31,60
-1087,83 -1925,75 5967957.94 655957.47 1408,00 33,74
-1071.87 -1944,60 5967973,50 655938,29 1431.32 38.83
-1059,13 -1965.86 5967985.79 655916.77 1455,73 16,07
-1046,64 -1989,23 5967997,78 655893.14 1482,02 17,75
) ) Bií8
ObP BP BAKM
HUGMlS
Baker Hughes INTEQ Survey Report INTEQ
Company: BP Amoco Date: 7/18/2002 Time: 14:55:42 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: G-10, True North
Site: PB G Pad Vertical (TVD) Reference: 15 : 10 6/3/1995 00:00 70.3
Well: G-10 Section (VS) Reference: Well (0.00N,O.00E,291.00Azi)
Wellpath: G-10B Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
9974.57 66.27 293.67 9012.01 8941.67 -1032.49 -2019.40 5968011.30 655862.68 1515.27 16.72
10006.77 71,19 293.14 9023.69 8953.35 -1020.57 -2046.93 5968022,63 655834.90 1545.24 15.36
10035.93 75.76 290.97 9031.98 8961.64 -1010.08 -2072.84 5968032.57 655808.79 1573.18 17.22
10072.76 84.64 289.80 9038.25 8967.91 -997.46 -2106.82 5968044.47 655774.55 1609.43 24.31
10104,79 90.79 289.80 9039.52 8969.18 -986.62 -2136.92 5968054.67 655744.23 1641.41 19.20
10136.52 91.41 288.22 9038,91 8968.57 -976.29 -2166,91 5968064.37 655714.03 1673.12 5.35
10169.74 93,34 284.36 9037.54 8967.20 -966.98 -2198,77 5968073.01 655681,99 1706,19 12.98
10207.57 93.87 281.02 9035.16 8964.82 -958.69 -2235.59 5968080.52 655645.00 1743.54 8.92
10240.98 93,69 274,16 9032,95 8962.61 -954,29 -2268.62 5968084,23 655611.89 1775.95 20.50
10275.24 94.66 272,58 9030.46 8960.12 -952.28 -2302.73 5968085,52 655577.75 1808.51 5.40
10305.92 94.13 269.41 9028.11 8957,77 -951.75 -2333.31 5968085.41 655547.17 1837.25 10.45
10341.21 90.59 268.81 9026.65 8956,31 -952.30 -2368,56 5968084.12 655511.94 1869,97 10.17
10374.47 90.88 263,61 9026.23 8955.89 -954.49 -2401.73 5968081.22 655478.82 1900.15 15.66
10403,71 90.97 261.15 9025.75 8955.41 -958.37 -2430,71 5968076.74 655449.93 1925.81 8.42
10437.27 90.61 257.29 9025.29 8954.95 -964.65 -2463.67 5968069.77 655417.12 1954.33 11.55
10476.84 95.62 262.38 9023.14 8952.80 -971.62 -2502.53 5968061.98 655378.41 1988.12 18.03
10511.68 96.94 266.78 9019.33 8948.99 -974.89 -2537.00 5968057.99 655344.02 2019.12 13.11
10541,54 94,92 273.28 9016.24 8945.90 -974.87 -2566,68 5968057,38 655314,35 2046,84 22.68
10571.32 92.64 276.27 9014.28 8943,94 -972.40 -2596.29 5968059.23 655284.70 2075.37 12.61
10603.47 94.48 277 .68 9012.28 8941.94 -968.50 -2628.13 5968062,46 655252,78 2106,50 7,21
10641.39 89.65 275.22 9010.91 8940.57 -964.25 -2665.78 5968065,92 655215.06 2143.16 14.29
10679.58 87.71 278.81 9011.79 8941.45 -959.59 -2703.66 5968069.78 655177.08 2180.20 10.68
10713.42 86.31 283.83 9013.56 8943,22 -952.96 -2736.79 5968075.71 655143.83 2213.50 15.38
10753.34 84.64 289.80 9016.71 8946.37 -941 .45 -2774.86 5968086.41 655105.52 2253.17 15.48
10802.37 83.32 282.25 9021.86 8951.52 -928.00 -2821.69 5968098.88 655058.43 2301.71 15.55
10831.33 86.40 280.66 9024.46 8954.12 -922.27 -2849.96 5968104.01 655030.05 2330.15 11.96
10857.71 89.82 281.89 9025,33 8954.99 -917.12 -2875.81 5968108,62 655004.10 2356.13 13.78
10892.71 87.28 276.98 9026.21 8955.87 -911.38 -2910.31 5968113.63 654969.48 2390.40 15.79
10920.61 84.99 274.52 9028.09 8957.75 -908.59 -2938.00 5968115.83 654941.74 2417.25 12.03
10954.65 86.31 274.87 9030.67 8960.33 -905.82 -2971.83 5968117.90 654907.86 2449.83 4.01
10984.50 90.44 268.90 9031.52 8961.18 -904.84 -3001.63 5968118.25 654878,05 2478,00 24.31
11016.30 90.70 265.03 9031.21 8960.87 -906.52 -3033,38 5968115,90 654846.35 2507.04 12.20
11055.50 96.33 262.57 9028.80 8958.46 -910.74 -3072.26 5968110,86 654807,57 2541.82 15.67
11090.80 97,73 259.05 9024.48 8954,14 -916,33 -3106.84 5968104,54 654773,12 2572,10 10,66
11120.80 89,56 259.05 9022.58 8952.24 -922.02 -3136.21 5968098.24 654743,88 2597.48 27.23
11152.65 91.41 263.27 9022.31 8951,97 -926,91 -3167,67 5968092,69 654712,53 2625,10 14.47
11182.40 90.44 266.44 9021.83 8951.49 -929.58 -3197,29 5968089.40 654682.97 2651.80 11.14
11241.00 90.44 266.44 9021.38 8951,04 -933.21 -3255.78 5968084.53 654624.58 2705.10 0.00
BP Amoco
Parent Wellpath:
Tie on MD:
Rig:
Ref, Datum:
V,Sectlon
Angle
291.00.
WELLPATH DETAILS
G-10B
500292055302
G-10A
9620.00
Nordic 1
15 : 10 61311995 00:00
70.34ft
Origin
+N/-S
Origin
+E/-W
0.00
Starting
From TVD
0.00
0,00
REFERENCE INFORMATION
Co-ordinate I,{tE¡ Reference: Well Centre: G-10. True North
V'it~igtf~~ (V~\ ~~~~~~~~~: ~~t~~ ro~ggJ.6~oÕ~)el
Measured Depth Reference: 15: 106/3/199500:00 70.34
Calculation Method: Minimum Curvature
ANNOTATIONS
lYO
MD Annotation
6705.73 9620.00 KOP
6951.04 11241.00 TO
8400
8450
8500
8550
-
C
.- 8600
~ 8650
-
;i8700
a.
~8750
~8800
~ 8850
>
Ql8900
~ 8950 ~ G.10 (G.10A)1
9000
9050
9100
9150
rw "N.'-S +£J-W St.pe
fjir æ!~ fHä wi 5
ObP
- -.
.5 -900--= u-
= ~
8 -1O°o?-
.... -
--1100-
.. -.
:ë'-1200-= - .
1: -
0 -1300--=
~ -
::!-1400-~
.c :::
'5 -1500-= .---_. .
0 -
en -1600--=:
-1700-..:--
-1800-- .
-1900 :::
-2000~ .
Rill
BISL.
INTEQ
T
^M
4
LEGENO
- G-10.G-10B,Plan #fj
- G-10 (G-10)
G-10 (G-10A)
- G-10B
Wellpath: (G-10/G-10B)
Azimuths to True North
Magnetic North: 26.32'
Stre~~ffi~~~~ò~~~
Dip Angle: 80.81'
Date: 5/2212002
Model: BGGM2002
{{~
tZ
~:';.~I~~
Created By: Bnj Poln!s
Date: 7/1812002
Contact Infonnation.
Direct: (907) 267.6613
E .mail bri¡potnis@ioteQcom
Baker Hughes INTEG (907) 267-6600
-400~
---~--~
--------
-- - ~ --------
~--_.- -----
-500~-
-- - ------
-------
'-.,.--./
-600-:::---- --
- ------------
-700-=---- .
- -~---------
-800-= -
- -- ---<---- ------------
- -~--------------
-----~----
- "-------
~---- ------
-~- --- ---
---- -------- -------
-- ------------
--------~ ----
----~-
---------
------.--,--~--
-------- - ---
--~---- --~---- ---
-~----
--~~------~
~- ------------
-- ---- --~- --
-~------- -------
-- ------- -------
------- .----~--------"
----~-----
"-----
------- - - ---
-2100-= ---'------- '_:__:-:-------'=~-
-3900 -3800 -3700 -3600 -3500 -3400 -3300 -3200 -31 00 -3000 -2900 -2800 -2700 -2600 -2500 -2400 -2300 -2200 -21 00 -2000 -1900 -1800 -1700 -1600 -1500 -1400 -1300
West(-)/East(+) [100ft/in]
. ----~--
-.'
---~-~----
- - - ---- -
----- ------- -
_~BI
-------------"
- - -- ------ - - --- -- ----
-_._~---
" --- ------- -
~-----~-
--~- - ---------.,--------------.------~--------
1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 195020002050 2100 215022002250 2300 2350 2400 2450 2500 2550 2600 2650 2700 2750 2800 2850 2900 2950
Vertical Section at 291.00° [50ft/in]
7/18/2002 2:511 PM
:~
11-Aug-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Definitive
Re: Distribution of Survey Data for Well G-108
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 9,618.15 I MD
Window / Kickoff Survey 9,620.00 I MD (if applicable)
Projected Survey: 10,400.00 I MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
AUachment(s)
RECEIVED
AUG 1 ¡:. 2002
Alaska Oil & Gas Cons. C011UJÙSSk)n
Anchorage
dO~-I',
\'
-
)
0)
o.
~
~qOMS 8FL
AI ,('>
UQ 2 2 20æ
0 ~F.'\. ~ !'~r~V~
~.~ ~ f ~
¡ & .....
,-
North Slope Alaska
BPXA
PBU_WOA G Pad, Slot G-10
G-10B
Job No. AKMW22098, Surveyed: 26 June, 2002
SUR VE Y R E PO R T
11 August, 2002
Your Ref: API 500292055302
Surface Coordinates: 5969088.00 N, 657859.00 E (70019' 20.0666" N, 148043'12.1905" W)
Kelly Bushing: 70.34ft above Mean Sea Level
,-
speraray-suf1
DRIL.LING sEevu::es
A Halliburton Company
Survey Ref: svy11265
Sperry-Sun Drilling Services .
Survey Report for G-10B
Your Ref: API 500292055302
Job No. AKMW22098, Surveyed: 26 June, 2002
BPXA
North Slope Alaska PBU_WOA G Pad
Measured Sub-Sea Vertical Local Coordinates. Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
9618.15 50.940 59.110 8704.56 8774.90 1214.15 S 1946.16 W 5967833.18 N 655938.81 E -748,36 Tie On Point
MWD Magnetic
9620.00 50.969 59.110 8705.73 8776.07 1213.41 S 1944.93 W 5967833.94 N 655940.02 E 1.578 -747.87 Window Point
- 9640.74 40.610 59.000 8720.17 8790.51 1205.78 S 1932.20 W 5967841.84 N 655952.59 E 49.949 -742.78
9691.44 42,010 29.650 8758.62 8828.96 1182.32 S 1909.44 W 5967865.78 N 655974.85 E 38.072 -739,86
9721.54 36.910 14.000 8781.91 8852.25 1164.74S 1902.25 W 5967883.51 N 655981.67 E 37.027 -745.33
9751.64 40.250 357.660 8805.49 8875.83 1146.20 S 1900.46 W 5967902.08 N 655983.07 E 35.532 -755.61
9781.61 45.440 343.770 8827.51 8897.85 1126.21 S 1903.85 W 5967921.99 N 655979.26 E 35.882 -770.82
9811.61 44.910 330.410 8848.71 8919.05 1106.70 S 1912.08 W 5967941.33 N 655970.62 E 31.599 -789,50
9843.26 50,710 318.280 8870.00 8940.34 1087.79 S 1925.79 W 5967959.95 N 655956.52 E 33.740 -812.05
9875,24 51,240 302.290 8890.21 8960.55 1071.83 S 1944.64 W 5967975.51 N 655937.33 E 38.828 -836.75
9906,09 55.720 299.650 8908.57 8978.91 1059.09 S 1965.90 W 5967987.80 N 655915.81 E 16,066 -861.28
9937.29 60.640 296.660 8925.02 8995.36 1046.60 S 1989.27 W 5967999.79 N 655892.18 E 17,745 -887.31
9974.57 66.270 293.670 8941.67 9012.01 1032.45 S 2019.45 W 5968013.31 N 655861.72 E 16.717 -919.66
10006.77 71.190 293.140 8953.35 9023.69 1020.53 S 2046.98 W 5968024.64 N 655833.94 E 15.356 -948,56
10035.93 75.760 290.970 8961.64 9031.98 1010.05 S 2072.88 W 5968034.58 N 655807.82 E 17,219 -975.29
10072.76 84.640 289.800 8967.91 9038.25 997.42 S 2106.87 W 5968046.48 N 655773.58 E 24.313 -1009.65
10104.79 90.790 289.800 8969.18 9039.52 986.59 S 2136.96 W 5968056.69 N 655743.26 E 19.201 -1039.86
10136.52 91.410 288.220 8968.57 9038.91 976.25 S 2166.96 W 5968066.39 N 655713.06 E 5.348 -1069.67
10169.74 93.340 284.360 8967.20 9037.54 966.94 S 2198.81 W 5968075.02 N 655681.02 E 12.982 -1100.28
.-. 10207.57 93,870 281.020 8964.82 9035.16 958.65 S 2235.64 W 5968082.54 N 655644.02 E 8,922 -1134,12
10240.98 93,690 274.160 8962.61 9032.95 954.25 S 2268.66 W 5968086.24 N 655610.91 E 20.495 -1162.55
10275.24 94,660 272.580 8960.12 9030.46 952.24 S 2302.77 W 5968087.53 N 655576.77 E 5.401 -1190,32
10305,92 94,130 269.410 8957.77 9028.11 951.71 S 2333.35 W 5968087.42 N 655546.18 E 10.446 -1214.42
10341,21 90,590 268,810 8956.31 9026.65 952.26 S 2368.60 W 5968086.13 N 655510.95 E 10,174 -1241.47
10374.47 90.880 263.610 8955.89 9026.23 954.46 S 2401.77 W 5968083.24 N 655477.83 E 15,657 -1265,87
10403.71 90.970 261.150 8955.41 9025.75 958.33 S 2430.75 W 5968078.75 N 655448.95 E 8.418 -1285.95
10437.27 90,610 257.290 8954.95 9025.29 964.61 S 2463.71 W 5968071.79 N 655416.13 E 11.551 -1307.61
10476.84 95.620 262,380 8952.80 9023.14 971.58 S 2502.57 W 5968064.00 N 655377.42 E 18.033 -1333.43
10511.68 96.940 266.780 8948.99 9019.33 974.85 S 2537.04 W 5968060.00 N 655343.03 E 13,112 -1358.16
10541.54 94.920 273.280 8945.90 9016.24 974.83 S 2566.72 W 5968059.40 N 655313.35 E 22,683 -1381.24
---------------~----------..- --- - - --~-- -~---.---
11 August, 2002 - 19:17
Page 2 0'4
DrillQllest 2.00,09.003
Sperry-Sun Drilling Services .
Survey Report for G-10B
Your Ref: API 500292055302
Job No. AKMW22098, Surveyed: 26 June, 2002
BPXA
North Slope Alaska PBU_WOA G Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) ("/1 OOft)
10571.32 92.640 276.270 8943.94 9014.28 972.36 S 2596.33 W 5968061.25 N 655283.70 E 12,608 -1405.80
10603.47 94.480 277.680 8941.94 9012.28 968.46 S 2628.18 W 5968064.47 N 655251.77 E 7.205 -1433.00
10641.39 89,650 275.220 8940.57 9010.91 964.21 S 2665.82 W 5968067.93 N 655214.05 E 14.291 -1464.93
^'- 10679.58 87.710 278.810 8941.45 9011.79 959.55 S 2703.70 W 5968071.80 N 655176.08 E 10.683 -1497.31
10713.42 86.310 283.830 8943.22 9013.56 952.92 S 2736.83 W 5968077.73 N 655142.82 E 15.381 -1527.23
10753.34 84.640 289.800 8946.37 9016.71 941.41 S 2774.91 W 5968088.43 N 655104.51 E 15.484 -1564.06
10802.37 83.320 282.250 8951.52 9021.86 927.96 S 2821.73 W 5968100.90 N 655057.41 E 15.548 -1608.92
10831.33 86.400 280.660 8954.12 9024.46 922.23 S 2850.00 W 5968106.03 N 655029.03 E 11.958 -1634.49
10857.71 89.820 281.890 8954.99 9025.33 917.08 S 2875.85 W 5968110.64 N 655003.07 E 13.776 -1657.82 Last Sperry Survey
10892.71 87.280 276.980 8955.87 9026.21 911.34 S 2910.35 W 5968115.64 N 654968.46 E 15.790 -1688.24 First Baker Survey
10920.61 84.990 274.520 8957.75 9028.09 908.55 S 2938.05 W 5968117.85 N 654940.71 E 12.031 -1711,52
10954.65 86.310 274.870 8960.33 9030.67 905.78 S 2971.87 W 5968119.91 N 654906.84 E 4.011 -1739.56
10984.50 90,440 268.900 8961.18 9031.52 904.80 S 3001.68 W 5968120.27 N 654877.02 E 24.309 -1763.33
11016.30 90,700 265,030 8960.87 9031.21 906.48 S 3033.42 W 5968117.92 N 654845.31 E 12.197 -1786.95
11055.50 96.330 262.570 8958.46 9028.80 910.70 S 3072.30 W 5968112.88 N 654806.53 E 15.668 -1814,50
11090,80 97.730 259.050 8954.14 9024.48 916.29 S 3106.88 W 5968106.56 N 654772.08 E 10,662 -1837.86
11120.80 89.560 259.050 8952.24 9022.58 921.98 S 3136.25 W 5968100.26 N 654742.84 E 27.233 -1857.11
11152.65 91.410 263.270 8951.97 9022.31 926.87 S 3167.71 W 5968094.71 N 654711.48 E 14.466 -1878.48
11182.40 90.440 266.440 8951.49 9021.83 929.54 S 3197.33 W 5968091.42 N 654681.92 E 11.142 -1899.82
11241.00 90.440 266.440 8951,04 9021.38 933.18 S 3255.82 W 5968086.55 N 654623.53 E 0.000 -1942.98 Projected Survey
-"'-~
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well Reference and calculated along an Azimuth of 129.000" (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11241.000.,
The Bottom Hole Displacement is 3386.91ft., in the Direction of 254.007° (True).
-~----- -
----- -- ----------------
11 August, 2002 - 19:17
Page 3 of4
DrillQlIest 2.00,09.003
North Slope Alaska
Comments
Measured
Depth
(ft)
/-
9618.15
9620.00
10857.71
10892.71
11241.00
Sperry-Sun Drilling Services
Survey Report for G-10B
Your Ref: API 500292055302
Job No. AKMW22098, Surveyed: 26 June, 2002
Station Coordinates
TVD Northlngs Eastings
(ft) (ft) (ft)
Comment
8774.90 1214.15 S 1946.16 W Tie On Point
8776.07 1213.41 S 1944.93 W Window Point
9025.33 917.08 S 2875.85 W Last Sperry Survey
9026.21 911.34 S 2910.35 W First Baker Survey
9021.38 933.18 S 3255.82 W Projected Survey
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
8774.90
Survey tool program fa, G-10B
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
9618.15
-
11 August, 2002 - 19:17
9618.15
11241.00
8774.90 NO Error - Unknown DEAP Error (G-10A)
9021.38 MWD Magnetic (G-10B)
---- - ------~-
Page 4 of4
.
BPXA
PBU_WOA G Pad
- ------ ----.
D,mQuest 2.00.09.003
\
~~fÆjE ]iF !Æ~!Æ~&!Æ
AltASIiA OIL AND GAS
CONSERVATION COMMISSION
/
/
¡
/
TONY KNOWLES, GOVERNOR
333 W. 7TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276.7542
Mary Endacott
CT Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re:
Prudhoe Bay Unit G-l OB
BP Exploration (Alaska), Inc.
Permit No: 202-117
Surface Location: 2554' SNL, 2368' WEL, Sec. 12, TIIN, RI3E, UM
Bottomhole Location: 3479' SNL, 135' WEL, Sec. 11, TIIN, RI3E, UM
Dear Ms. Endacott:
Enclosed is the approved application for permit to redrill t1;J.e above referenced well.
The permit to redrill does not exempt you from obtaining additional permits or approvals required by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required permits and approvals have.. been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient
notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a
test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission
petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Ûí&u1v~ . kul/
cam~hSli Taylor ð
Chair
BY ORDER OE THE COMMISSION
DATED this~day of June, 2002
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation wlo encl.
ALASì
STATE OF ALASKA '
)OIL AND GAS CONSERVATION COLJISSION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test aa Development Oil
0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
KBE = 70.34' Prudhoe Bay Field I Prudhoe
6. Property Designation Bay Pool
ADL 028280
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
G-10B
9. Approximate spud date
06/12/02./ Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 11080' MD I 8955' TVDss
0 17. Anticipated pressure {s,e 20 AAC 25.035 (e) (2)}
94 Maximum surface 2244 psig, At total depth (TVO) 8800' I 3300 psig
Setting Depth
Top Bottom Quantitv of Cement
Lenath MD TVD MD TVD (include staae data)
1580' 9500' 8695' 11080' 8955' 34 sx Class 'G' ../
v.J Q~ (;1 ILfI 0 L-
A-- ~ (~ IG':¿
1 a. Type of work 0 Drill aa Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2554' SNL, 2368' WEL, SEC. 12, T11 N, R13E, UM
At top of productive interval
3883' SNL, 4501' WEL, SEC. 12, T11 N, R13E, UM
At total depth
3479' SNL, 135' WEL, SEC. 11, T11 N, R13E, UM
12. Distance to nearest property line 13. Distance to nearest well J/
ADL 028285,1801' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 9600' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casina Weiaht Grade Couplina
2-3/8" 4.6# L-80 ST-L
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
Hole
3"
19. To be completed for Redrill, Re-entry, and Deepen Òperations.
Present well condition summary ,
Total depth: measured 11170 feet
true vertical 9026 feet
Effective depth: measured 11088 feet
true vertical 9029 feet
Length
. 'Plugs (measured)
'r
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Liner
Size
Cemented
MD
TVD
110'
2685'
9182'
20" X 30"
13-3/8"
9-5/8"
Cement to Surface 110'
3500 sx AS II, 20 sx Top Job 2686'
1100 sx Class 'G', 140 sx AS I 8250'
1011 sx Class 'G'R E C E , V E "4149' - 10235'
125 sx Class 'G' 1JI 01 07' - 11170'
110'
2686'
7536'
6086'
1063'
7"
4-1/2"
4079' - 9035'
9010' - 9026'
true vertical
8903' - 9030' (twelve intervals)
JUN 0 J 2002
Alaska OIS & Û" '. '
dv \'JUnt., vU¡¡/"",),':ë>¡OI
Anchorage
Perforation depth: measured
9839' - 11080' (twelve intervals)
20. Attachments
aa Filing Fee 0 Property Plat aa BOP Sketch 0 Oiverter Sketch !HI Drilling Program
!HI Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Mary Endacott, 564-4388
21. I hereby certify that th1fjfore o¡ng, is, ,\t~ ~~;;~r~c~t~est of m,y kn~~le" dge ,
Signed Mary Endacott I(¡ JJ j CU' /!/f[ffffÆfA Title CT Dnlllng Engineer
uv . J ' Commission Use ,Only ,
Permit Number API Number APrr,p lal ~t~ See cover letter
202..- .<t:? 50- 029-20553-02 1/ I D 0/\ for other reauirements
Conditions of Approval: Samples Required 0 Yes EI No Mud Log Rec.~ej 0 Yes 181 No
, Hydrogen Sulfide Measures ~ Yes 0 No Directional Survey Required ~ Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
OtheC:œ}~~ k Ss 00 f'i: . by order of
~~;~o~~~~~ Rev. 12-01-85 0 R¡bifi\JA L the commission
Prepared By Name/Number: Terrie Hubble, 564-4628
Date tø/3/02-
Date
0 11 O,~
Subm tin -riplicate
)
)
BP
G-10b CTD Sidetrack
Summary of Operations:
A CTD through tubing sidetrack is planned for G-10a. The coil sidetrack, G-10b, will exit the 3 Y2" x 7" liner
in Zone 2 and target Zone 1 B. G-1 Ob will be completed with a fully cemented 2 3/8" liner. The existing perfs
will be isolated by a bridge plug and cement as described in the 10-403. /
Phase 1: Prep work. Planned ASAP.
1. Wireline will punch the 3%" tubing at 9500' and 9700'.
2. Wireline will set a CIBP at 9680' and a LSX whipstock at 9600'.
3. Service coil will downsqueeze 35 bbls./of 15.8 ppg squeeze slurry to stabilize the 3%" inside the 7"
liner for window milling and isolate the perfs below. The cement job will be tested to 2000 psi /'
before milling the window.
Phase 2: Mill window, Drill and Complete sidetrack: Planned for June 12, 2002.
Drilling coil will be used to mill the two string window then drill and complete the directional hole as per
attached plan.
Mud Program:
. Phase 1: Seawater
. Phase 2: Mill with seawaterlbiozan, drill with Flo-Pro (8.6 - 8.7 ppg) /
Disposal:
. All drilling and completion fluids and all other Cia, II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program:
The production liner will be 2 3/8':ßT-L from TD to approx. 9500'MD (8695 'ss). The liner will be
cemented with a minimum of 7 bbls to bring cement up to the top of the liner. A liner top packer will be
used if the lap fails to test.
Well Control:
. BOP diagram is attached. /
. Pipe rams, blind rams and the CT pack off will be pressure tes'd to 400 psi and to 3500 psi.
. The annular preventer will be tested to 400 psi and 2500 psi.
Directional:
. See attached directional plan. Max. planned hole angle is 93 deg. /
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging:
. MWD Gamma Ray will be run in the open hole section.
. Memory CNL will be run in cased hole.
Hazards: /
. The maximum recorded H2S on G pad offsets is <10 ppm G-14 ¡
. Zone 2 chert. Rotary briefly got stuck while drilling Zone 2 in G-10A.
. Moderate risk of lost circulation at fault.
. Geosteering near H.O.T.
Reservoir Pressure:
Reservoir pressure is estimated to be 3300 p~i at 8800'ss (7.2 ppg emw). Maximum surface pressure
with gas (0.12 psi/ft) to surface is 2244 psi. j'
TREE = 3-1/8" FMC W /4" QU
WB..LI-EAD = McEVOY
ÃCfûA""TÒR";'-'--- .. AXELSON
KB. ElEV == -6if59,
BF~'ECÊV ;-'''-''-------'''''-32-:27''
.....................""......""'....,,'.....''''. . ''''~
KOP = 3205'
,..".. ,........,' """" , ,,,,,..,,,,,,,,...J
Max Angle == 94 @ 10939'
Datum MD == 9775'
bäiürn'i\ÏÖ';;;""'" ""'8'aööï"ss
13-3/8" CSG, 72#, N-80, ID = 12.347" 1-1
Minimum 10 = 2.750" @ 9727'
3-112" HES X NPPLE
1 TOPOF7" SCAB LNR 1-1
)
----)
G-10A
SA FETY NOTES
8)
-
-
2686' ~
:8:
4149' r-¡
I 7" SCAB LNR, 29#, L-80, .371 bpf, D = 6.814" H 8064'
1 TOP OF 7' LNR H 8064'
~
9-5/8" CSG, 47#, L-80, ID = 8.681" 1-1
3-1/2" lBG, 9.3#, L-80, 0.0087 bpf, D = 2.992" 1-1
1 TOP OF 5" LNR 1-1
7" LNR, 29#, L-80, 0.0371 bpf, ID = 6.184" 1-1
9182'
9788' 1
10107 ~
10235'
ÆRFORA TION SUMMARY
REF LOG: SPffiRY SUN MWD
ANGLE AT TOP PERF: 62 @ 9839'
Note: Refer to Production DB for historical perf data
SA= INTERVAL 0 Ft.J/SQZ DATE
6 9839 - 9844 0 01/31/01
4 9843 - 9846 0 12/24/99
6 9936 - 9956 0 11/01/01
4 10080 -10090 0 01/12/96
4 10135 -10155 0 01/02/96
4 10185-10225 0 09/20/95
4 10250 -10340 0 06/23/95
4 10368 -10400 0 06/23/95
4 10420 -10526 0 06/23/95
4 10650 -10730 0 06/23/95
4 10880 -10900 0 01/02/96
4 10964 -11080 0 06/23/95
SIZE
2-1/2"
2"
2-1/2"
2-1/Z'
2-1/2"
2-1/2"
2-3/4"
2-3/4"
2-3/4"
2-3/4"
2-3/4"
2-3/4"
2201' H 3-1/2" HES XBD SSSV LA ND NIP, ID = 2.75" 1
~ 2604' H 9-5/8" rN PKR I
GAS LIFT Mð.NæB..S
~ ST rvD TVD DEV lYÆ VLV LATa-t RJRT DATE
2 3918 3878 28 FMHO RK
1 4039 3984 30 FMHO RK
L
~ 4072' I- 9-5/8" X 3-1/2" BKR SABL-3 PKR
W/KBH-22 ANCHOR SEAL ASSY, 10=3.93"
4157' H 9-5/8" x 7' BA Kffi LNR PKR, ID = 6.187" I
~
~
8072' 1-1 9-5/8" x 7" BA KER LNR PKR, ID = 6.187" I
8255' H TOP OF CEMENT 1
9727 H 3-1/2" HESX NIP, ID =2.750" I
9740' 1- 7' X 3-1/2" BAKER SABL-3 A<R,
NO ANa-tOR ASSY, ID = 3.97'
I 9765' H 3-1/2" HES X NIP, ID = 2.750" I
1 9776' 1-1 3-1/2" I-ES X NIP, ID = 2.750" I
9788' - 3-1/2" TBG TAIL WLEG, D = 2.99" I
9776' ELrvD TT LOGGED 07/11/95 I
10115' l-i 7" X 5" BKR A<R, ID = 4.5" 1
9-5/8" SIDErRA CK WINOOW
8250' - 8300'
1 PBID H 11088' I
4-1/2"LNR,15#,13-8CR,0.0188bpf,D=4.283" H 11170' I
DATE
04/81
06125/95
02/15/01
02/02/01
09/21/01
SIS-s I
SIS-rvD
RN/lP
REV BY
COMM:NTS
ORlGIN4.L COMR...ETION
SIŒTRAO< OOWlErION
CONVERTED TO CANV AS
FIN4.L
CORRECllONS
DA TE REV BY COMM:NrS
11/01/01 ON Sltlh ADD PERFS
PRUDH::>E BAY LNrT
WELL: G-10A
PffiMT t'-b: 95-0390
AR t'-b: 50-029-20553-01
See, 12, T11 N, R13E
BP Exploration (Alaska)
TREE = 3-1/8" FMC W/4" QU
I WELLHEAD = McEVOY
I ',"W,W._,"'''''-''"'''''^'''-'--,"'''''''",'",'",''''''M'_""",",,,,'''',,w'",,,'
. ACTUATOR = AXELSON
: 'î(B':'''ELEV'';'''''''''''''.'''' ','," ",'" '6'5':59'"
BF:-ËL8J-;"""-"'""","'''MW'_''M'''''32:27'
",w,'"w,,,,,,,',',',,,~,',-,,,',',''''',',.,','.,...,w,'.',,,,'.',,',',-.,w. ~."...\ ".",,,,',w,',"",,,--,,',,"".""'.',',', ...'........~.'...'.',.w.'.'......,..
KOP = 3205'
"~ã~"~:n~"I~w,;"~,,w,,--~~~~~~~!
Datum MD = 9775'
'Öãtum'''fVÖ';;'''''''''''''''''' """""'''ãäõÖ''''ss
')
13-3/8" CSG, 72#, N-80, 10 = 12.347" 1-1 2686"
Minimum ID = 2.750" @ 9727'
3-1/2" HES X NIPPLE
I TOP OF 7" SCAB LNR 1-1 4149"
17" Leak 100# in :30min 1-1416041871
195/8" Leak 2000psi instant loss 1-1 6072M6105
7" SCAB LNR, 29#, L-80, .371 bpf, ID = 6.814" - 8064"
I TOP OF 7" LNR - 8064"
9-5/8" CSG, 47#, L-80, 10 = 8.681" 1-1 8250"
I Top of 2.3/8" Liner w! Liner top packer -
I Top of Cement -
9495'
9500.
1~:l1/2" I...SX Whipstock,
2,'74" window
11
9600'
1 CIBP
1-1 9700'
3-1/2" TBG, 9.3#, L-80, 0.0087 bpf, 10 = 2.992" 1-1 9788"
2"
PERFORATION SUMMARY
REF LOG: SPERRY SUN MWO
ANGLE A T TOP PERF: 62 @ 9839'
Note: Refer to Production DB for historical perf data
SPF INTERV AL OPN/SQZ DA TE
6 9839 - 9844 0 01/31/01
4 9843 - 9846 0 12/24/99
6 9936 - 9956 0 11/01/01
4 10080 -10090 0 01112/96
4 10135 -10155 0 01/02/96
4 10185 -10225 0 09/20/95
4 10250 -10340 0 06/23/95
4 10368 -10400 0 06/23/95
4 10420 -10526 0 06/23/95
4 10650 -10730 0 06/23/95
4 10880 -10900 0 01/02/96
4 10964 -11080 0 06/23/95
SIZE
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-3/4"
2-3/4"
2-3/4"
2-3/4"
2-3/4"
2-3/4"
r PBTD - 11088"
4-1/2" LNR, 12.6#, L-80, NSCT, ID = 4.283" 11170"
G-10B
Proposed CTD Sidetrack
8
S/ '}Y NOTES
2201" 1-1 3-1/2" HES XBO SSSV LAND NIP, 10 = 2.75" I
~ 2604" 1-1 9-5/8" DV PKR I
-
-
r-JI
:8:
t--l
j
1-
L
:8:
DATE REV BY COMMENTS DATE REV BY COMMENTS
04/81 ORIGINAL COMPLETION 11/01/01 CWS/tlh ADD ÆRFS
06/25/95 SIDETRACK COMPLETION 05/31/02 MSE PROPOSED CT ST
02/15/01 515-151 CONVERTED TO CANVAS
02/02/01 SIS-MD FINAL
09/21/01 RNITP CORRECTIONS
J
i
1-1
I
>'"'
,"
1/
I r",,,,,:,",:nn:~n' :
1\ 8. r~
1:,,:~. .
::,/ .ç .
~; ',¡ ::''':: ;, -;' ~ 1
~-:.::;::,:,[~I
;:':.~Ù~;;;,~:,,"',
~':¡2L;:.~',:~~~
(;;~:,;~:;~:{~~-':'~ ;
~
GAS LIFT MANDRELS
~ ST MO ìVD DEV TYÆ VLV LATCH PORT DATE
2 3918 3878 28 FMHO RK
1 4039 3984 30 FMHO RK
4072" 1- 9-5/8" X 3-1/2" BKR SABL-3 PKR
W/KBH-22 ANCHOR SEAL ASSY, ID = 3.93"
4157" 1-1 9-5/8" x 7" BAKER LNR PKR, 10 = 6.187" I
8072" 1-1 9-5/8" x 7" BAKER LNR PKR, 10 = 6.187" I
9-5/8" SIDETRACK WINDOW
8250' - 8300'
I .2 3..'ß" Cem~l1te."j ,311d p(:rfëd liner
/
1-1 11080' 1
'~I~'~'~:':::::~~,--~:~~-=::J
9727'
9740"
- 3-1/2" HES X NIP, ID = 2,750" I
- 7" X 3-1/2" BAKER SABL-3 PKR.
NO ANCHOR ASSY 10 = 3.97"
- 3-1/2" HES X NIP, ID = 2,750"
- 3-1/2" HES X NIP, ID = 2.750"
- 3-1/2" TBG TAIL WLEG, 10 = 2,99" I
9765"
9776"
9788"
10107" 1-1 TOP OF LNR 1
10115" 1-1 7" X 5" BKR PKR. 10 = 4.5" I
7" LNR. 29#, L-80. NSCC, 0.0371 \-1 I
bpf, 10 = 6.184" I 10235"
PRUDHOE BA Y UNrr
WELL: G-10B
ÆRMrr No:
API No: 50-029-20553-02
Sec. 12,T11N,R13E
BP Exploration (Alaska)
BP Amoco
0.... bp
. INTEQ
- ...
BAKIR-
IRIGHIS
LEGEND
- 6010 (6010)
-- - 6010 (6oIOA)
- Plan156010B
- P1an15
T
AM
¿
Magnetic Field
Strength: 57505nT
Dip Angle: 80,81"
Date: 221055/2002
Model: BGGM2001
Contact Information:
"--J:.'h.~
WIILLPATH II8I'AlLS
..... .. ..,..
__U82
G-18A
-
Azimuths to True North Plan: Plan #5 (G-1DlPlan #5 G-1OB)
Magnetic North: 26,32° Created By: James ohfinger Date: 31/05512002
Direct: (907) 267-6610
E-mail: james.oh~nger@inteq.oom
Baker Hughes INTEQ: (907) 267-6600
....
....-
v....-
....
......'
e...
e...
~
e...
tI.,e 8l1li... -
'e.utl
= =
REFERENCE INFORMATION
Co-ordlnate (NIE! Reference: Well Centre: G-10. TNe North
v~~g ~:,~;~:: ~r~~Ó roe~~~el
Measured Dapth Reference: 15: 1061311995 00:00 70.34
Calculation MethGd: Minimum CUNature
... - ...
I =::::: ~
, ...... AM ....
: =¡¡::g t11S
. ....... _n "'7.
T .........n ...".
e__-
. i~ -- ......
"8"81'" 81.81 ør.T.8
tt.- --..
"8'-- -..a .....
~:~== :::: 1m:
..I........ -.a M&.M
..81""'" .... 18&81
.8'lIOII 88TAIU
IV8 - -
== :1:t.:: :=:ft
...... .......... .........
:=: ~= ~==
""78 "'11"M .........7.
mt: :tr.= ~=:f
...... 4It.7.""""
--.,. --... 4tM-
M87.M - -ata...
== :::::me:
====
""'"8 -8ZL8I .........
- W8C8
=:: ..:=
.... -
&aI _AI
..&::: tC
-.-
==.:
..... -
!!:...=
~t:: -::
..... _eo
- T"",
.-..
.......
.cn.a
!5
=::
ma.a\
==
..,....
==:
-...
-
C
~ -900 -----
!.
-.
~A-
TW IID-
88201.78 - n...-
_,e -... 1001....-
_.78 ..,.... ,
87..... -... .
87- -... .
=... ,_., .
n ,".... .
_.sa ,_... a
..- ,_... ,
..11M ,_... .
....... ,_... e
-.. ,- ,.
,,_.. ft
TARGET DETALS
No... tVO +NI-S +£J.JN ~
g::~~ .g~ ::H~~:: ~
0-.011 TZ _.01 -814.32 .2228.88 -
0-'011 TI _.01 -1114.311 -1887.08 --
8350 j
8400~
8450l
~
- ..:
C 855O-j
i~
81) ..:
- '
oI:æro-J
.. '
18700 =1
a :
'i 8750 d
U ~
~ 8800 d
. ;
>~
.
e 89QO-j -
þoo .~ G-iO(G-1QA)
8950j
~
.~
- - -==,~L _n¡:!J__~ ,[1] fIJ
JI ---I ---.:::t=j-'- -,--
- _l--.~ --- -- -- - --'
-1G-10B-:;I'-- -í6oIOBT2I-----
l!J
-L-
I
[ill
I
I
IPl8nI5. G-10Bj
I
----
~f601OBT3r---
9050 j
9100 :;
--_.----
-i
[ ¡ i ; i ii,; '!:.' : ! I I : ! J ! I;. ¡ : J , ! ~ ; ; : ¡ ! ¡ ¡ ¡ j ¡ ¡ I r ¡ ¡ , : ¡ , . : ¡ ; ! r ¡ !! ¡ ¡ j ¡ ¡ ¡ ! ¡ ¡ ;, ¡¡! ¡ ;' ¡ : ; ¡! ¡ ¡ ¡ ¡ ¡ ¡ ! f ; j ¡ J ~ ¡ ¡ : i ..!!;! ,
1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950 2000 2050 2100 2150 2200 2250 2300 2350 2400 2450 2500 2550 2600 2650 2700 2750 2800 2850 2900 2950 3000 3050 3100
Vertical Section at 289.00° [50ft/in)
)
-
INTEQ" , ,
)
Baker Hughes INTEQ I
Baker Hughes INTEQ Planning Report
AnDotation
MD
ft
9494.34
9600.00
9610.00
9630.00
9680.00
10093.01
10159.00
10239.00
10289.00
,:'(',
:, \:::'1
G-10B Polygon
-Polygon 1
-Polygon 2
-Polygon 3
-Polygon 4
-Polygon 5
-Polygon 6
G-10B T3
70.34 ~938.13 -2069.90 5968104.5ß 655810,21 70,1910.817N 1,484412:571, W
70.34 ;,,938.13 ~2069.9Ø 5968104;~6655810.21 70 1910:817, N 148 44 12;571'W
70.34 :-113P;40 ~2444.01 S967904.48" 655440.25 70 19 8;925 N 148 ,44 23.486 W
70.34 -1041.36 -3357.42 5961974.28 654525;24 70 19 9.797N 1484450.141 W
70.34 -796.39 -3352.32 5968219.29 6$4525J 8 70 19 12.206 N 148 44 49.995 W
70;34 -736.19 -2880.93 5968289.38 654995.17 70 19 12.800 N 148 ,44 36.240 W
70.34 -791.28 -2156.87 5968249.54 655720.18 70 19 12.261 N 148 44 15.110 W
9025.34 -897.24 -3279.60 5968120.00 654600.00 70 19 11.215 N 148 44 47.872 W
9025.34 -914.32 -2229.66 5968125.00 655650.00 70 19 11.051 N 148 44 17.233 W
9035.34 -794.39 -1987.06 5968250.00 655890.00 70 19 12.231 N 148 44 10.155 W
G-10B T2
G-10B T1
TVD
ft
8695.13
8763.44
8770.04
8784.24
8820.66
9035.34
9033.06
9027.58
9025.87
Tie in Position
Kick off Point
1
2
3
4
5
6
7
) Baker Hughes INTEQ )
Baker Hughes INTEQ Planning Report
~.
INTÈQ'
':2" :,
Survey
. Ml)" ';, i I~~I"
111'1 . , Jt::, ,"'døSJ,:",
9494.34 48.25
9500.00 48.46
9525.44 49.40
9556.50 49.96
9587.17 50.57
9600.00 50.72 58.74 53~36 MOO
9610.00 46.72 58.74 180.00 MWD
9625.00 43.72 58.74 180;00 MWD
9630.00 42.72 58.74 180.00 MWD
9640.00 42.78 54.91 270.00 MWD
9660.00 43.29 47.32 8735.88 -1197.98 -1923.44 5967847.87 655962.10 26.00 1428.62 272.81 MWD
9680.00 44.29 39.95 8750.32 -1187.97 -1913.91 5967858.07 655971.41 26.00 1422.87 278.36 MWD
9700.00 42.84 32.69 8764.82 -1176.89 -1905.74 5967869.32 655979.34 26.00 1418.76 251.28 MWD
9720.00 41.88 25.11 8779.61 -1165.12 -1899.23 5967881.23 655985.60 26.00 1416.44 256.54 MWD
9740.00 41.43 17.31 8794.57 -1152.74 -1894.43 5967893.70 655990.14 26.00 1415.92 262.15 MWD
9760.00 41.52 9.46 8809.56 -1139.88 -1891.37 5967906.63 655992.93 26.00 1417.22 267.98 MWD
9780.00 42.13 1.71 8824.47 -1126.63 -1890.08 5967919.90 655993.94 26.00 1420.31 273.87 MWD
9800.00 43.25 354.22 8839.18 -1113.09 -1890.57 5967933.42 655993.17 26.00 1425.18 279.65 MWD
9820.00 44.83 347.09 8853.57 -1099.40 -1892.84 5967947.07 655990.61 26.00 1431.78 285.16 MWD
9840.00 46.84 340.40 8867.51 -1085.64 -1896.86 5967960.73 655986.30 26.00 1440.07 290.29 MWD
9860.00 49.20 334.17 8880.89 -1071.95 -1902.61 5967974.30 655980.26 26.00 1449.96 294.95 MWD
9880.00 51.88 328.39 8893.61 -1058.42 -1910.04 5967987.66 655972.55 26.00 1461.39 299.12 MWD
9900.00 54.82 323.04 8905.55 -1045.18 -1919.08 5968000.71 655963.23 26.00 1474.25 302.80 MWD
9920.00 57.98 318.08 8916.62 -1032.34 -1929.67 5968013.33 655952.38 26.00 1488.44 305.99 MWD
9940.00 61.32 313.46 8926.73 -1019.98 -1941.71 5968025.43 655940.08 26.00 1503.85 308.74 MWD
9960.00 64.80 309.13 8935.79 -1008.23 -1955.11 5968036.90 655926.44 26.00 1520.34 311.08 MWD
9980.00 68.41 305.04 8943.74 -997.17 -1969.75 5968047.64 655911.57 26.00 1537.79 313.04 MWD
10000.00 72.11 301.16 8950.50 -986.90 -1985.52 5968057.58 655895.60 26.00 1556.04 314.66 MWD
10015.96 75.11 298.18 8955.00 -979.33 -1998.82 5968064.87 655882.14 26.00 1571.08 315.98 G-10B
, bp
) ~)
, Baker Hughes INTEQ ,
Baker Hughes INTEQ Planning Report
.
INTEQ" ,
Survey
MD
ft
10020.00 297.44 8956.01 -977.51 -2002.28 5968066.62 655878.64 26.00 1574.95 ,~16.82 MWD
10040.00 79.71 293.83 8960.24 -969.06 -2019.90 '5968074.70 655860.85 /26.00 1594.36 317.00 MWD
10060.00 83.57 290.32 8$63.15 -961.62 -2038;23 ' ~9~80$~J~4 655842.37 26;00 ,1614.11 317..77 "MVVD
1 0080.00 87.46 286.,86 8964.71 ~955.27', ,-2Q57~12 5968087.69 $QS823:35 26.ØO 1634.Q.4' 318.28 MWD
10093.01 90.00 284.62 8965.00 ':'951.74 ':'2069.64, 5~.0$0:96 ' 6558tO.76' ' ~6J)0 "1647;O~, ,31~t55," MWÐ
10100.00 90.42 283.89 8964.97 .. ..950.02 -2076:41 5~a092.54 , 655åÓ3.Ö5' 12~QO, 1653.99' ;300;00 MWP '
10125.00 91.92 281.29 8964;46 :'944.57 -2100:80 ,5968097.47 " '655779.45, 12.00 1678.83 300.00 MWD
10150.00 93:41 278.69 '8963.30 '-94.0.~4 ..2125~39 59ß610t28 ',655"l54:1~ 12.00 ' ,1703,~49, '299.94 MWD
10159.00 93.95 217.75 8962.72 ..938¡96 -2134.28 S96ð1Q2.3~ ' 655745.86 12:00 11712.31 ' ,299:82 'MWD'
10175.00 93.95 275.83 8961.62 ~937.07 -2150:13 5968103.93 655729:98 12.00 ,1727.91', ',' 270.00 MWD
10200.00 93.94 272.82 8959.90 -935.19 -2175.00 5968105~29 655705.08 12.00 1752;03 2ß9:a? MVVO:
10225:00 93.91 269.81 8958.19 ,;,934.62 ':'2199:93 " 5968105:34 655680.t4' , 12.00, 1715.79 , 269.66' MOO
10239.00 93:89 268.,13 8957:24 ' -934;87' ':'2213:90 59~104;7~ '655668.19, 12.00 1188.92' 269.45 MWD
10250.00 93.05' 267,.12 '8956.57 :'935.32 -2224:87 5968104.11 655655:23 12.00 1799:14 230.00 MWD
10275.00 91.11 264,.82, 8955.67 -937.08 -2249:79 598a1 01:83 655630.3~ "12.00 1822.1 ~ 229.9~ 'MVVO
10289.00 90.03 263.54 8955.53 -938.50 -2263.71 5~8100j2 65561,6.46 '12.00 1834.83 ' 2,29.86 ,MVVD
10300.00 90.03 264.86 8955.52 ':939.61 -2274:66 ' ,5ØAAQ~Ø;?ii , ~56Q5.55, ' ~2.0a ~S+1.~2 90.09 ,MOO'
10325.00 90.03 267.86 8955.~1 ;'941;20 ~2299~60' ' 5$680~6.66 ,'6S~580.$4 12.00 1867.89 90,00' MV'$
10350.00 90.03 270.86 8955.4,9 ' "941.48 .;2324:60 5968095.85' , 65~555;66" 12.00 1891;43 90:do MWD
10375:00 90:03 273.86 8955.48' ' "940~45' -2349.57:' 5Q6S096:36 655530~67," 1'2.00 '1915.38 90,;00', MWO'"
1 0400.00 90;03 276.86 8955.47 ,.938.12 -2374,46 596$098.16, 655~O5~74¡' 12.00 1939.61 ,90.01 ,'MVVÐ I
10425.00 90.03 279.86 8955.46 .;934.49 -2~9,9~ 19 59~1 C>1.28 655480.94 12.00 1964.24 "90:01 MOO
10439.00 90.03 281.54 8955.45 -931.89 , -2~':2.9~ ' 5968103.58 ',eq~~;13 '12.0a 1978.99 " 90.q1 MWO
10450.00' '90.03 280.22 8955.44 ' -929.81 -2423; 75 5968105:43' 65~5ES.29 12~OO '19S8~98,1' 270;00 "'MOO,
10475.00 90.03 277.22 8955.43 -926.03 -2448.46 5$68108.7Ð 655431.51 12.00 2013.58 270;00 MVVD
10500.00 90.03 274.22 8955.42 -923.54 -2473.33 5968110.67 655406.59 12.00 2037.91 270,.00 MOO
10525.00 90.03 271.22 8955.41 -922.35 ':'2498.30 5968111.32 655381.60 '12.00 2061~9() 270.00 MOO
10550.00 90.03 268.22 8955.40 -922.48 -2523.30 5968110.67 655356.62' 12.00 2085.50 269.99 MOO
10575.00 90.03 265.22 8955:38 -923.91 -2548.25 5968108.72 655331.70' 12.00 2108.63 269.99 MOO
10600.00 90.03 262.22 8955.37 -926.64 -2573~10, 5968105.46 655306.91 12.00 2131.23 269.99 MOO
10625.00 90.03 259.22 8955.36 -930.68 ,;,2597.77 5968100:91 655282.34 12.00 2153.24 269.99 MOO
10639.00 90.03 257.54 8955.36 -933.50 -2611.48 5968097.80 655268.69 12.00 2165.29 269.99 MOO
10650.00 90.03 258.86 8955.35 -935.75 -2622.25 5968095.33 655257.97 12.00 2174.74 90.00 MWD
10675.00 90.03 261.86 8955.34 -939.94 -2646.89 5968090.62 655233.42 12.00 2196.68 90.00 MWD
10700.00 90.03 264.86 8955.33 -942.83 -2671.72 5968087.21 655208.66 12;00 2219.21 90.00 MWD
10725.00 90.03 267.86 8955.32 -944.42 -2696.67 5968085.09 655183.76 12.00 2242.28 90.00 MWD
10750.00 90.02 270.86 8955.31 -944.70 -2721.67 5968084.29 655158.77 12.00 2265.82 90.00 MWD
10775.00 90.02 273.86 8955.30 -943.67 -2746.64 5968084.79 655133.78 12.00 2289.77 90.01 MWD
10800.00 90.02 276.86 8955.28 -941.34 -2771.53 5968086.60 655108.85 12.00 2314.06 90.01 MWD
10825.00 90.02 279.86 8955.27 -937.70 -2796.26 5968089.71 655084.05 12.00 2338.63 90.01 MWD
10850.00 90.02 282.86 8955.26 -932.78 -2820.77 5968094.12 655059.45 12.00 2363.41 90.01 MWD
10864.00 90.02 284.54 8955.26 -929.47 -2834.37 5968097.14 655045.78 12.00 2377.34 90.01 MWD
10875.00 90.02 283.22 8955.25 -926.83 -2845.05 5968099.56 655035.05 12.00 2388.30 270.00 MWD
10900.00 90.02 280.22 8955.24 -921.75 -2869.53 5968104.12 655010.47 12.00 2413.10 270.00 MWD
10925.00 90.02 277.22 8955.23 -917.97 -2894.23 5968107.38 654985.69 12.00 2437.69 270.00 MWD
10950.00 90.02 274.22 8955.22 -915.48 -2919.11 5968109.35 654960.77 12.00 2462.02 270.00 MWD
10975.00 90.02 271.22 8955.21 -914.29 -2944.08 5968110.01 654935.79 12.00 2486.02 270.00 MWD
11000.00 90.02 268.22 8955.21 -914.42 -2969.07 5968109.36 654910.80 12.00 2509.61 269.99 MWD
11025.00 90.02 265.22 895520 -915.85 -2994.03 5968107.40 654885.88 12.00 2532.74 269.99 MWD
11050.00 90.02 26222 8955.19 -918.58 -3018.88 5968104.14 654861.10 12.00 2555.34 269.99 MOO
11075.00 90.02 259.22 8955.18 -922.62 -3043.55 5968099.59 654836.52 12.00 2577.36 269.99 MOO
11080.00 90.02 258.62 8955.18 -923.58 -3048.45 5968098.53 654831.64 12.00 2581.68 269.99 MOO
, ,1," ::"':::':::I';:,:I~~~.~,'~fi~~~~'~~tWi,}:;:I.~r, ;~i~~~~~:~~3~:i;'I¡'?'i:':~1~e~":::::q;,: ",,~';' ',,'
",I," i'" " :~: :'î:i: 'Î,~=,' "" 'jIÀI"'~~:::':','~,':',',':,',""",'" "',' ',',"" ',1$""1'Q'Øt31f9é6'PO'QO"70'3, ",,1\ ',,' ,,"" '."\ ,,', .:,,"~',' ,
. ".'. .'...:,.i..~¡~;i"i,\*JI~~~~"'~~'..
Comp...y: ,'BPAmoco,' ' ,
Field: " '..' "" Prudh~p8y
, Site: PBGPad, .'
, "'eU: G..1:0 ',.'.",", , ,
Wëllpa.b; ,Plan #5<3-108 '
, ,I,'
')
All Measurements are from top of Riser
~
Q)
en
.-
cr:
top of bag
~.~ '1".I'"lll~'
1, ~:j"'T I I
bttm of bag
middle of slips
Blind/Shears
middle of pipes
211 combi ram/slips
~
middle of flow cross
Mud Cross
~
middle of blind/shears
2 3/811 ram
middle of pipe/slips
211 combi ram/slips
Flow Tee
",.,...,.,....."
.~.-..-.-.~.~...
r-
"---'
")
5/31/2002
BAG
TOTs /'
Mud Cross
.".,",.,....". TOTs /
_....-.-.~..-/-
H 206712
DATE
INVOICE I CREDIT MEMO
040902 CK040902N
PYMT COMMENTS:
HANDL:NG INST:
DESCRIPTION
PERMIT TO DRILL FEE
S/H - TERRIE HUBBLE
RECEIVED
JUN 0 3 2002
Alaska ou &- (ja~ LOII~. lJOIlIl11t&5'OI1
Anchorage
WeLL.:¡T r;.../ 0./5
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
PAY
To The
ORDER
O-f
TOTAL ~
DATE
04/ii/02
CHECK NO.
----.-.-
üü¿ü.~ / 1 ¿
GROSS
iOO.OO
VENDOR
DISCOUNT
ALASKAOILA
NET
100.00
X4628
G- \0 {)
100.001
100. 00
FIRST NATIONAL BANK OF ASHLAND
AN AFFlUATE OF
NATIONAL CITY BANK
CLEVELAND. OHIO
No. H 208712
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
41'2"
00206712
ONE HUNDRED & 00/100************************************* US DOLLAR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
AK 99501
DATE
04iili02
AMOUNT
$100.00
NOT VALID AFTER 120 DAYS
. r1"~~-' " '1
\( j1{!;/lU~ f ~
. .' . . (: ~.,. ¡l..4V .
' ~~, ..-' :, --dr )P
,~
III 2 0 b ? ~ 2 III I: 0 L. ~ 2 0 3 8 9 5 t: 0 0 B L. L. ~ 9 III
.°-..
00
H
--
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
DEVELOPMENT
REDRILL
v
EXPLORA TION
INJECTION WELL
INJECTION WELL
REDRILL
Rev: 5/6/02
C\jody\templates
) )
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME AIf 4 C - /¿J-ð
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If API number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
"CL UE"
The permit is for a new wellbore segment of existing well
--' Permit No, API No.
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(t), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
ANNULAR DISPOSAL Please note that an disposal of fluids generated. . .
INTO ANNULUS OF
ANOTHER WELL ON
SAME PAD
L-)
SPACING EXCEPTION
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
WELL PERMIT CHECKLIST COMPANY,,¡If/,)é WELL NAME~q f':-/óS
FIELD & POOL hf/C'/5/J INIT CLASS O~ /-ø>"/
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . .
2. Lease number appropriate. . . . . . . . . . . . . . . . . . .
3. Unique well name and number. .. . . . . . . . . . . . . . . .
4. Well located in a defined pool.. . . . . . . . . . . . . . . . .
5. Well located proper distance from drilling unit boundary. . . .
6. Well located proper distance from other wells.. . . . . . . . .
7. Sufficient acreage available in drilling unit.. . . . . . . . . . .
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . .
9. Operator only affected party.. . . . . . . . . . . . . . . . . .
10. Operator has appropriate bond in force. . . . . . . . . . . . .
11. Permit can be issued without conservation order. . . . . . . .
~PR .!?~:.E/ 12. Permit can be issued without administrative approval.. . . . .
ð//- t;V9/ð¿ 13. Can permit be approved before 15-day wait.. . . . . . . . . .
ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . .
15. Surface casing protects all known USDWs. . . . . . . . . . .
16. CMT vol adequate to circulate on conductor & surf csg. . . . .
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . .
18. CMT will cover all known productive horizons. . . . . . . . . .
19. Casing designs adequate for C, T, B & permafrost. . . . . . .
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . .
21. If a re-drill, has a 10-403 for abandonment been approved. . .
22. Adequate well bore separation proposed.. . . . . . . . . .-. .
23. If diverter required, does it meet regulations. . . . . . . . . .
24, Drilling fluid program schematic & equip list adequate. . . . .
25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . .
26. BOPE press rating appropriate; test to 3500 psig.
27. Choke manifold complies w/API RP-53 (May 84). . . . . . . .
28. Work will occur without operation shutdown. . . . . . . . . . .
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . .
30. Permit can be issued wlo hydrogen sulfide measures. . . . . jrY@
31. Data presented on potential overpressure zones. . . . . . . Y N
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y
AßP~ ~AIE 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . N
/fré: £'/Ç/~ 34. Contact name/phone for weekly progress reports [exploratory 0 1 Y N
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface;
(C) will not impair mechanical integrity of the well used for disposal;
(D) will not damage producing formation or impair recovery from
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION:
RPc¡ffc
APP.R DA T~
VJ~A- &/4{ 02-
h-~ ~r;,--.c d-
GEOLOGY
APPR DATE
~r¿ ~'d,¿
PROGRAM: Exp - Dev.A. Redrll.x.. Serv - Wellbore seg - Ann. disposal para req -
GEOL AREA r;??d UNIT# // C, 5' Co ON/OFF SHORE (1 Jt J
~N
Y N
Yj N
Y¡ N
Y N
Y N
Y N
Y N
U: ~
Y N
N
ʡJ/k-
,._~-N-
~ ~ Á~'jtLÆ~te 8)éœs ~ .
t§ì N CTI)Ú- .
*Q~
N ¡..I1it-
N
N
N M. ~ P 2- 2- t/£/ f f t" .
N
~
(
þ.~.
(
\J0OS¥L \-0 ~ ~ ~ cA>:c-
Commentsllnstructions:
JDH
WGA W6rA-
&9--1,,\ ~r(; .:a::>-
COT I /
DTS 06¡06 o~
G:\geology\permits\checklist.doc
)
)
. Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file. .
To improve the readability of the Well History file and to
simpltfy finding information, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special' effort has been made to chronologically
organize this category of information.
)
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon Feb 24 08:57:33 2003
Reel Header
Service name. . . . . . . . . . . . .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03 /02/24
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... .UNKNOWN
Comments................ .STS LIS
)
¿Xoa-/II
/ /5/lj
Writing Library. Scientific Technical Services
Tape Header
Service name. . . . . . . . . . . . .LISTPE
Date.................... .03/02/24
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS
Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 5
AK-MW-22098
C. ZAWADZKI
C. SEVICK/G.
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 8
AK-MW-22098
B. JAHN
G. SARBER /
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 11
AK-MW-22098
B. JAHN
G. SARBER /
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
G-10B
500292055302
BP Amoco
Sperry-Sun Drilling Services
24-FEB-03
MWDRUN 6
AK-MW-22098
B. JAHN
G. SARBER /
MWDRUN 9
AK-MW-22098
B. JAHN
G. SARBER /
12
11N
13E
2554
MWDRUN 7
AK-MW-22098
B. JAHN
G. SARBER /
MWD RUN 10
AK-MW-22098
B. JAHN
G. SARBER /
)
)
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
2368
MSL 0)
70.34
36.99
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
2.750 3.500 9620.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED. THESE DEPTHS
ARE BIT DEPTHS.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH - SUBSEA
(TVDSS) .
3. MWD RUNS 1 - 11 COMPRISED DIRECTIONAL WITH NATURAL
GAMMA RAY (PC G) UTILIZING
SCINTILLATION DETECTORS. MWD RUNS 1 - 4 INVOLVED IN
SETTING THE WHIPSTOCK
AND MILLING THE WINDOW. NO DATA FOR THESE RUNS ARE
PRESENTED. THE TOP OF THE
WHIPSTOCK WAS POSITIONED AT 9620'MD.
4. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED
TO A SCHLUMBERGER
CASED-HOLE GAMMA RAY LOG RUN IN G-10B ON 29 JUNE
2002. THESE PDC DATA WERE
PROVIDED BY D. SCHNORR (BP) ON 10/14/02. LOG HEADER
DATA RETAIN ORIGINAL
DEPTH REFERENCES.
5. MWD RUNS 1 - 11 REPRESENT SPERRY-SUN DRILLING
SERVICES' (SSDS) PORTION OF
WELL G-10B WITH API#: 50-029-20553-02. THIS WELL
SECTION REACHED A TOTAL
DEPTH (TD) OF 10944'MD/8956'TVDSS. AT THIS DEPTH SSDS
WAS REPLACED BY BAKER
HUGHES INTEQ.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRD = SMOOTHED NATURAL GAMMA RAY.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type......... . . . . . . .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
1
clipped curves; all bit runs merged.
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
$
)
)
.5000
START DEPTH
9603.5
9630.0
STOP DEPTH
10914.0
10941.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH -----
BASELINE
9603.5
9608.0
9616.5
9620.5
9624.5
9647.0
9651.5
9656.5
9664.0
9667.0
9680.5
9694.5
9700.0
9707.0
9715.5
9741.5
9758.5
9764.5
9779.5
9788.5
9792.5
9796.0
9802.0
9809.5
9837.5
9844.5
9857.0
9860.5
9870.5
9874.5
9889.0
9896.0
9907.0
9914.5
9918.5
9931.0
9944.0
9947.5
9952.5
9956.0
9957.5
9964.0
9970.0
9973.5
9978.0
9979.5
9992.0
10000.0
10003.5
10007.0
10024.5
10028.5
10045.5
DEPTH
GR
9607.0
9611.5
9619.0
9622.5
9626.5
9649.0
9653.5
9659.0
9666.5
9669.0
9683.0
9697.0
9703.0
9709.5
9718.0
9744.0
9761.0
9767.0
9780.0
9789.5
9793.0
9797.5
9803.0
9810.5
9836.0
9845.0
9858.0
9862.0
9871.5
9874.5
9889.5
9896.5
9907.5
9915.5
9921.0
9930.5
9943.0
9947.0
9952.5
9956.0
9957.0
9962.5
9970.5
9973.5
9978.0
9980.5
9990.5
9999.0
10002.5
10006.0
10024.0
10028.0
10045.5
, )
,.)
10052.0 10052.0
10057.0 10058.0
10075.5 10079.5
10083.5 10088.0
10089.0 10094.5
10091.0 10097.0
10122.0 10127.5
10124.5 10130.0
10164.5 10169.5
10177.5 10183.5
10189.0 10192.5
10216.0 10219.0
10221.0 10225.0
10265.0 10267.5
10282.5 10284.0
10286.5 10287.5
10291.0 10292.5
10306.5 10310.0
10317.0 10319.0
10321.0 10321.5
10330.5 10329.5
10348.5 10347.5
10350.5 10349.5
10356.5 10356.5
10366.0 10367.0
10400.0 10400.5
10401.5 10402.0
10402.5 10403.5
10415.5 10417.5
10431.5 10432.5
10445.0 10446.5
10453.5 10455.0
10463.0 10465.0
10468.0 10472.0
10519.5 10521.5
10538.0 10539.0
10547.0 10549.0
10558.5 10559.0
10571.0 10572.0
10575.5 10576.0
10581.0 10582.0
10592.0 10593.0
10595.0 10597.0
10598.0 10602.0
10599.0 10603.0
10629.0 10633.0
10640.5 10644.5
10658.5 10661.5
10676.5 10680.0
10706.5 10709.0
10715.5 10718.5
10723.0 10725.0
10728.5 10731.0
10740.5 10742.5
10749.0 10751.5
10752.0 10755.0
10759.5 10761.5
10771.0 10773.5
10776.0 10778.0
10787.5 10789.5
10793.5 10795.5
10797.5 10800.0
10813.5 10817.0
10835.5 10838.0
10838.5 10840.0
)
)
10841.0
10843.0
10850.0
10851.5
10854.0
10858.5
10865.5
10871.0
10880.5
10883.5
10893.5
10895.5
10899.5
10905.5
10911.0
10941.0
$
10842.0
10844.0
10851.0
10852.0
10855.0
10859.0
10865.0
10871.0
10883.5
10885.0
10892.5
10894.5
10901.5
10905.5
10914.0
10943.5
#
MERGED DATA
PBU TOOL
MWD
MWD
MWD
MWD
MWD
MWD
MWD
$
SOURCE
CODE
BIT RUN NO
5
6
7
8
9
10
11
MERGE TOP
9607.0
9679.0
9801.0
9886.0
9902.0
10060.5
10107.5
MERGE BASE
9679.0
9801.0
9886.0
9902.0
10060.5
10107.5
10943.5
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9603.5 10941 10272.3 2676 9603.5 10941
ROP MWD FT/H 0.03 2531.65 81.8927 2623 9630 10941
GR MWD API 11.4 357.84 59.3025 2622 9603.5 10914
First Reading For Entire File......... .9603.5
Last Reading For Entire File.......... .10941
File Trailer
Service name.......... ...STSLIB.001
Service Sub Level Name...
)
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9607.0
ROP 9632.0
$
2
)
header data for each bit run in separate files.
5
.5000
STOP DEPTH
9651.0
9679.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
21-JUN-02
Insite
3.3
Memory
9679.0
9605.0
9679.0
51.0
51.0
TOOL NUMBER
16
2.750
9620.0
KCl Biozan
8.60
7.0
17000
2.0
.000
.0
)
)
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.000
.000
.000
.0
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9607 9679 9643 145 9607 9679
ROP MWD050 FT/H 0.73 51.34 28.0246 95 9632 9679
GR MWD050 API 11.4 73.34 26.7782 89 9607 9651
First Reading For Entire File......... .9607
Last Reading For Entire File.......... .9679
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..03/02/24
Maximum Physical Record. .65535
File Type.... . . . . . . . . . . . . LO
)
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
)
header data for each bit run in separate files.
6
.5000
START DEPTH
9651.5
9679.5
STOP DEPTH
9774.0
9801.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
22-JUN-02
Insite
3.3
Memory
9801.0
9679.0
9801.0
39.0
51.0
TOOL NUMBER
15
2.750
9620.0
LSND
8.60
5.0
7.0
17000
2.0
.000
.000
.000
.000
.0
145.9
.0
.0
)
)
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9651.5 9801 9726.25 300 9651.5 9801
ROP MWD060 FT/H 0.28 35.44 18.2441 244 9679.5 9801
GR MWD060 API 20.01 164.11 33.012 246 9651.5 9774
First Reading For Entire File......... .9651.5
Last Reading For Entire File.......... .9801
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9774.5
ROP 9801.5
$
4
header data for each bit run in separate files.
7
.5000
STOP DEPTH
9859.0
9886.0
#
LOG HEADER DATA
)
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
23-JUN-02
Insite
3.3
Memory
9886.0
9801.0
9886.0
44.9
50.7
TOOL NUMBER
15
2.750
9620.0
Flo Pro
8.60
9.0
21000
8.8
.000
.000
.000
.000
.0
150.1
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
) )
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9774.5 9886 9830.25 224 9774.5 9886
ROP MWD070 FT/H 0.03 24.32 5.86926 170 9801.5 9886
GR MWD070 API 19.11 95.07 29.9703 170 9774.5 9859
First Reading For Entire File......... .9774.5
Last Reading For Entire File.......... .9886
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9859.5
ROP 9886.5
$
5
header data for each bit run in separate files.
8
.5000
STOP DEPTH
9876.0
9902.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
23-JUN-02
Insite
3.3
Memory
9903.0
9886.0
9903.0
51.2
51.2
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
TOOL NUMBER
16
')
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
2.750
9620.0
Flo Pro
8.60
9.0
21000
9.2
.000
.000
.000
.000
.0
150.1
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD080 FT/H 4 1 68 4 2
GR MWD080 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9859.5 9902 9880.75 86 9859.5 9902
ROP MWD080 FT/H 0.05 13.55 4.49078 32 9886.5 9902
GR MWD080 API 16.26 80.97 30.9178 34 9859.5 9876
First Reading For Entire File......... .9859.5
Last Reading For Entire File.......... .9902
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
)
File Type................LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
6
)
header data for each bit run in separate files.
9
.5000
START DEPTH
9876.5
9902.5
STOP DEPTH
10033.5
10060.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
23-JUN-02
Insite
3.3
Memory
10060.0
9903.0
10060.0
55.7
71.2
TOOL NUMBER
16
2.750
9620.0
Flo-Pro
8.60
8.8
20000
8.0
.000
.000
.000
.000
.0
154.3
.0
.0
)
)
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD090 FT/H 4 1 68 4 2
GR MWD090 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9876.5 10060.5 9968.5 369 9876.5 10060.5
ROP MWD090 FT/H 1.6 120.94 68.8007 317 9902.5 10060.5
GR MWD090 API 21.69 311.25 53.9083 315 9876.5 10033.5
First Reading For Entire File......... .9876.5
Last Reading For Entire File.......... .10060.5
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.007
Physical EOF
File Header
Service name............ .STSLIB.007
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.006
Comment Record
')
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
7
)
header data for each bit run in separate files.
10
.5000
START DEPTH
10034.0
10061.0
STOP DEPTH
10085.5
10107.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
24-JUN-02
Insite
3.3
Memory
10107.0
10060.0
10107.0
84.6
84.6
TOOL NUMBER
16
2.750
9620.0
Flo-Pro
8.60
9.2
20000
6.8
.000
.000
.000
.000
.0
154.3
.0
.0
')
)
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD100 FT/H 4 1 68 4 2
GR MWD100 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10034 10107.5 10070.8 148 10034 10107.5
ROP MWD100 FT/H 3.95 129.75 87.3942 94 10061 10107.5
GR MWD100 API 42.42 127.02 65.4086 104 10034 10085.5
First Reading For Entire File......... .10034
Last Reading For Entire File.......... .10107.5
File Trailer
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.008
Physical EOF
File Header
Service name............ .STSLIB.008
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10086.0
ROP 10108.0
$
8
header data for each bit run in separate files.
11
.5000
STOP DEPTH
10917.0
10943.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE
26-JUN-02
VERSION:
Insite
)
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
3.3
Memory
10944.0
10107.0
10944.0
83.3
96.9
TOOL NUMBER
16
2.750
9620.0
Flo-Pro
8.60
9.0
22000
9.2
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD110 FT/H 4 1 68 4 2
GR MWD110 API 4 1 68 8 3
Name Service Unit
DEPT FT
Min
10086
Max
10943.5
Mean Nsam
10514.8 1716
)
.0
167.0
.0
.0
First
Reading
10086
Last
Reading
10943.5
)
')
ROP MWDll0 FT/H
GR MWDll0 API
0.93
29.5
2531.65
357.84
106.201 1672
69.9624 1663
10108
10086
10943.5
10917
First Reading For Entire File......... .10086
Last Reading For Entire File.......... .10943.5
File Trailer
Service name............ .STSLIB.008
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .03/02/24
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.009
Physical EOF
Tape Trailer
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/02/24
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS
Writing Library. Scientific Technical Services
Reel Trailer
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/02/24
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS
Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
)
)
a o~.;. / J7
1/7/7
**** REEL HEADER ****
RWD
03/05/05
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
RWD
03/05/04
319114
01
TINY TRAK" CTK
*** LIS COMMENT RECORD ***
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
-Version Information
VERSo
WRAP.
-Well Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 9590.0000:
STOP.FT 11241.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCAT I ON :
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API. API NUMBER:
-Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
Remark File Version 1.000
Extract File: ldwg.las
1. 20:
NO:
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration (Alaska), Inc.
G-I0B
Prudhoe Bay Unit
70 deg 19' 20.046"N 148 deg 43' 12.169"W
North Slope
Alaska
Baker Hughes INTEQ
TINY-TRAK
27-Jun-02
500292055302
-------------------------------
Description
SECT.
TOWN.N
RANG.
PDAT.
EPD .F
LMF .
FAPD.F
DMF
EKE .F
EDF .F
EGL .F
CASE.F
OSl
OS2 .
12
IlN
13E
MSL
0
DF
70.34
DF
NA
70.34
N/A
10235
DIRECTIONAL
NA
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
Other Services Line 2
')
)
-Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) Logging data from 9593' MD (8689' SSTVD) to 10917' MD (8957'
SSTVD) was provided by Sperry Sun Drilling Services. The data
from 10917 to TD is memory data.
(4) Well G-10B is a sidetrack of the original well G-10, kicked off
at 9620' MD (8706' SSTVD).
(5) Baker Hughes INTEQ run 1 utilized TINY TRAK with Gamma services
from 10917' MD (8957' SSTVD) to 11241' MD (8951' SSTVD).
(6) The data presented here is final and has been depth shifted to a
PDC (Primary Depth Control) curve supplied by BP
(SWS, 29-06-2002).
(7) The depth from 11241' MD (8951' SSTVD) to 11223' MD (8951' SSTVD)
was not logged due to sensor to bit offset.
MNEMONICS:
GRAM -> Gamma Ray MWD-API [MWD] (MWD-API units)
ROPS -> Rate of Penetration, feet/hour
SENSOR OFFSETS:
RUN GAMMA
1 18.40 ft.
CURVE SHIFT DATA
OBSERVED, ACTUAL, DISPLACEMENT
9626.14, 9623.98, ! -2.16113
9658.86, 9656.22, ! -2.6416
9696.59, 9694.19, ! -2.40234
9792.68, 9791.72, ! -0.960938
9802.77, 9800.85, ! -1.9209
9861.9, 9860.46, ! -1.44043
9943.16, 9945.57, ! 2.40137
9980.83, 9979.39, ! -1.44141
10006, 10006.8, ! 0.719727
10027.8, 10028.5, ! 0.720703
10051.9, 10051.4, ! -0.480469
10096.8, 10091.3, ! -5.52344
10103.4, 10097.6, ! -5.76367
10287.2, 10286.5, ! -0.720703
10307.6, 10304, ! -3.60254
10356.1, 10356.1, ! 0
10446.4, 10445.2, ! -1.20117
10540.2, 10539.5, ! -0.720703
10585.6, 10582.7, ! -2.88184
10718.8, 10715.2, ! -3.60254
10731.3, 10727.9, ! -3.36133
10739.7, 10737.6, ! -2.16113
10742.4, 10740.4, ! -1.92188
10752, 10748.8, ! -3.12207
10755.1, 10751.7, ! -3.3623
10761.8, 10759.6, ! -2.16113
10769.5, 10765.2, ! -4.32227
10773.6, 10771.2, ! -2.40137
10842.4, 10841.2, ! -1.20117
10852.7, 10851.5, ! -1.20117
10858.9, 10858, ! -0.960938
10944.5, 10943.1, -1.44141
10956.8, 10955.8, -0.959961
10964, 10962.3, -1.68066
10999.7, 10996.9, -2.88184
11039.5, 11037.1, -2.40234
11104.3, 11103.6, -0.720703
11140.3, 11142, 1.68066
EOZ
END
DIRECTIONAL
23.38 ft.
Tape Subfile: 1
103 records...
Minimum record length:
10 bytes
)
,)
Maximum record length:
132 bytes
**** FILE HEADER ****
RWD
.001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
mwd.xtf
150
BP Exploration (Alaska), Inc.
G-10B
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!! !!!!! !!! ! !!! !! ! !! Remark File Version 1.000
1. The data presented has been edited from the field raw data.
2. The data has been depth shifted to match the PDC supplied by BPX.
3. The PDC used is a Schlumberger Gamma Ray dated 29-Jun-02.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
GR
ROP
----------------------------------------------------
GR
ROP
GRAM 0 2
ROPS02
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
Size Length
1
2
68
68
4
4
4
4
1
1
API
F/HR
GR
ROP
MWD
MWD
-------
8
)
)
Total Data Records:
40
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
9590.000000
11241. 000000
0.500000
**** FILE TRAILER ****
Tape Subfile: 2
49 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
RWD
.002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
mwd.xtf
150
BP Exploration (Alaska),
G-I0B
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
! ! !!! ! !! ! !! !!!! ! !!! Remark File Version 1.000
The data contains the unedited field raw data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAM
ROPS
GRAM
ROPS
GRAM
ROPS
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
1
FRAME SPACE =
0.500 * F
)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
Size Length
1
2
GRAM MWD
ROPS MWD
68
68
1
1
API
F/HR
4
4
4
4
-------
8
Total Data Records:
40
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
9590.000000
11241. 000000
0.500000
**** FILE TRAILER ****
Tape Subfile: 3
49 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
RWD
03/05/04
319114
01
**** REEL TRAILER ****
RWD
03/05/05
BHI
01
Tape Subfile: 4
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
J
)
Tape Sub file 1 is type: LIS
)'
Tape Subfile 2 is type: LIS
DEPTH
9590.0000
9590.5000
9600.0000
9650.0000
9700.0000
9750.0000
9800.0000
9850.0000
9900.0000
9950.0000
10000.0000
10050.0000
10100.0000
10150.0000
10200.0000
10250.0000
10300.0000
10350.0000
10400.0000
10450.0000
10500.0000
10550.0000
10600.0000
10650.0000
10700.0000
10750.0000
10800.0000
10850.0000
10900.0000
10950.0000
11000.0000
11050.0000
11100.0000
11150.0000
11200.0000
11241. 0000
GR
-999.2500
-999.2500
14.0085
35.0242
35.5361
25.5064
51.2877
19.2051
28.8592
90.3179
39.8508
69.7472
147.6338
57.2791
41.6476
45.3715
105.5345
66.0234
74.9958
42.9552
52.8286
31.7726
46.2924
32.4674
40.8400
130.8214
46.5585
63.7104
117.0352
148.4908
59.7299
54.4688
101. 0116
107.6577
92.5783
-999.2500
)
ROP
-999.2500
-999.2500
-999.2500
38.3971
32.2801
19.8255
2.4048
7.1140
6.0262
48.8515
95.9705
86.1268
124.4454
97.5560
112.0329
119.9941
152.7364
135.6304
48.0203
58.6828
145.9089
501. 0748
90.2857
148.1660
109.5190
35.0483
90.7672
92.2148
62.1030
44.0222
37.3959
83.1959
44.3840
80.6748
53.5333
-999.2500
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
9590.000000
11241.000000
0.500000
"
Tape Subfile 3 is type: LIS
DEPTH
9590.0000
9590.5000
9600.0000
9650.0000
9700.0000
9750.0000
9800.0000
9850.0000
9900.0000
9950.0000
10000.0000
10050.0000
10100.0000
10150.0000
10200.0000
10250.0000
10300.0000
10350.0000
10400.0000
10450.0000
10500.0000
10550.0000
10600.0000
10650.0000
10700.0000
10750.0000
10800.0000
10850.0000
10900.0000
10950.0000
11000.0000
11050.0000
11100.0000
11150.0000
11200.0000
11241. 0000
GRAM
-999.2500
-999.2500
13.8400
23.0900
71.5600
26.8400
22.4200
23.2200
30.0300
62.3300
39.6800
66.6500
263.4500
57.8000
46.8900
43.3400
74.6900
62.1800
71. 4100
41.3500
54.3200
34.9800
53.4400
31.2400
40.9000
148.5500
59.3700
60.7400
112.1300
143.1650
73.1960
54.7710
90.8190
107.0850
88.6190
-999.2500
)
ROPS
-999.2500
-999.2500
-999.2500
41.5600
14.5000
23.2600
1.4100
1.1700
1.5800
23.0800
95.5800
101.8600
107.9900
84.4500
151.3500
118.0200
163.2100
134.5600
85.8000
89.6900
144.2200
232.2900
76.3700
135.4300
112.1400
151.6700
93.9900
91.5000
5.7100
45.7960
41. 7580
11.3370
61.8720
16.7560
53.2870
-999.2500
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing =
Tape File Depth Units = feet
9590.000000
11241.000000
0.500000
)
)
Tape Subfile 4 is type: LIS