Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-132 ) ) Image Project Order File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. d. 0;),. - 13~ Order File Identifier Organizing (done) 0 Two-sided 1111111111111111111 D Rescan Needed 1I11I n 1111111111 RESCAN DIGITAL DATA ~skettes, No. ~ 0 Other, No/Type: OVERSIZED (Scannable) 0 Maps: 0 Color Items: 0 Greyscale Items: 0 Other Items Scannable by a Large Scanner 0 Poor Quality Originals: OVERSIZED (Non-Scannable) 0 Other: 0 Logs of various kinds: NOTES: Scanning Preparation BY: Helen ~ d.. X 30 = 00 + 0 Other:: Date: ro /:;)£; lð t Isl V)I1.p DatefJ!;JG/ b ~IIII~~/"II ~ P I = TOTAL PAGES hI (coun~. dO,s not ~n~ude cover sþJ(~.e )p Date:'6 / :15"/ ó Lj /5/ YJI/ 1111111111111111111 BY: Helen ~~ia) Project Proofing BY: Helen ~ BY: Production Scanning Stage 1 Page Count from Scanned File: h:)-- (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: 0ES I Helen CM~ia) Date:1f áo . YES NO ð l - Isl .¡N( P Stage 1 If NO in stage 1 page(s) discrepancies were found: NO BY: Helen Maria Date: /s/ Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Helen Maria Date: /5/ Comments about this file: Quality Checked 1111111111111111111 8/24/2004 Orders File Cover Page.doc • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 S AN E D rIB 2 4 2012 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission _ ) 3 333 West 7 Avenue ao Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPS -Pad t r 1 Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, ri ) Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPS -Pad 10/11/2011 Corrosion • Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011 MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS-16 2030650 50029231510000 1.2 NA 1.2 NA 102 7/29/2011 MPS -17 2021730 50029231150000 Open Flutes - Treated MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009 MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011 ` MPS-23 2021320 50029230980000 , Open Flutes - Treated MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011 MPS -25 2021030 50029230890000 Open Flutes - Treated MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS-28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011 MPS -29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 , 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS -32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011 MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS-37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011 MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS-90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011 MPSB -04 , 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011 e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc Permit to Drill 2021320 MD 8110 ¡/ REQUIRED INFORMATION DATA INFORMATION l ~ I~ ~ '-\ DATA SUBMITTAL COMPLIANCE REPORT 8/2/2004 11 ~,J.. ) c¡ J ~ w. Jv01 J- API No. 50-029-23098-00-00 Well Name/No. MILNE PT UNIT SB S-23 Operator BP EXPLORATION (ALASKA) INC lVD 4189 --/ Completion Date 7/10/2002 / Completion Status 1-01L Current Status 1-01L UIC N .-- Mud Log No <.~~.~:--.. Directional SurveYí~-Yes ) l--"..~- Samples No MWD, GR, RES, ABIIIFR. CASANDRA (data taken from Logs Portion of Master Well Data Maint) Types Electric or Other Logs Run: Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ~ 0 (jn85 LIS Verification i I I I i i I Rpt I i- ED c...o ~t ~ ~C ~2 Log Log Run Scale Media No 1 Interval OH / Start Stop CH Received Comments 60 8056 Open 11/19/2002 -- A Directional Survey Log is required to be submitted. This record automatically created from Permit to Drill Module on: 6/21/2002. 0 8110 Open 8/1/2002 MWD 0 8110 Open 8/1/2002 0 8110 Open 8/1/2002 MWD 60 8056 Open 11/19/2002 110 8110 Case 2/28/2003 Digital Well Logging data 0 8110 Open 8/1/2002 60 8109 110 8110 Case ROP, EWR, DGR 110 8110 Case ROP, EWR, DGR Sample Set Sent Received Number Comments -- Directional Survey Directional Survey Directional Survey LIS Verification CAse C Pdf C Pdf Directiohal...SQrV~Y <11756 LIS Verification ~56 Rate of Penetration 11756 Induction/Resistivity Rpt i~ Well Cores/Samples Name 25 25 Information: Interval Start Stop DATA SUBMITTAL COMPLIANCE REPORT 8/2/2004 Permit to Drill 2021320 Well Name/No. MILNE PT UNIT SB S-23 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23098-00-00 MD 8110 lVD 4189 Completion Date 7/10/2002 Completion Status 1-01L Current Status 1-01L UIC N ADDITIONAL INFORMATION Well Cored? V{!D Daily History Received? ~ WN (!yN Chips Received?'--v+N...., Formation Tops Analysis Received? Ylt-.J Comments: - Compliance Reviewed By: llJ-a Date: I ~ ~~ kJ'ì ~ "'I '- ') ) ~O~ ---\3d- WELL LOG TRANSMI'ITAL To: State of Alaska Alaska Oil and Gas Conservation Conun. Attn.: Lisa Weepie 333 West 7t1\ Avenue, Suite 100 Pu1chorage,AJaska 99501 February 25, 2003 RE: MWD Formation Evaluation Logs: MPS-23, AK-MW-22108 MPS-23: Digital Log Images: 50-029- 23098-00 1 CD Rom " J 1 '?/O PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Atto: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-") 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: Ie I l D . 0 3 Signed ¿;¿~ ßvvr 9 \~'.08\ (H ~I. t j,~. , F' C 11""'" I', Þ .:"".', iJ' 'i~~ ,\11- ,1 0 .1;"t.':'.{ I;/" ~\ \: \;" ~,. ,.," ,,,,....' {--'''II\. '!<).a.."¡;ril. 'i~,:. il'L¡''''''I~ '" 'Ii ~P? ."' ..~' ~..', ' t~;¿,t:~. :. ~~... . . .~ . :... , , '\ . '. .' \ II ) I 1159 ~D~- ~ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 J\nchorage,AJaska 99501 February 25, 2003 RE: MWD Formation Evaluation Logs: MPS-23, AK-MW-22 1 08 M.PS-23: Digital Log Images: 50-029-23098-00 1 CD Rom . , PLEASE ACKNOWLEDG.E REC.EIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF TH.E TRANSMITTAL LEITER TO TH.E ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: Sign&~ I RECEIVED FEB 28 2003 Alas1œ Oii & Gas Cons. Commlseton Anchorage ) ) a CB- /3d 11~?5 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Conun. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 9950"1 ~overnber12,2002 RE: MWD Formation Evaluation Logs MPS-23, AK-MW-22 108 1 LIS forma.tted Disc with verification listing, API#: 50-029-23098-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd, Anchorage, Alaska 99648 BP Exploration (Alaska) Inc, Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Si~~ RECEIV'F~t1 _¡ ,~",l No V 1 9 ()!~n') L....l.~ Alaska Ot~ fJ (""n i' I \.1 \J.:.!\.~ '-'O¡;R ('.--f'''m¡" . "... ~iI:li 38100 Anctr0f8ge STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised 09/06/02, Start Production ) ') 1. Status of Well B Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface r"""-......."....,c.".,.,',.c 3293' NSL 252' WEL SEC 12 T12N R10E UM ..~. COMPU:T::;~,.' '.,: ~. . "..-..,...,... .~I"..\.''''''''.\.'-..... At top of productive i~tervai' , , J "1 ¡~~~ ~ '"LOCAYK)NS~ 3427' NSL, 1809'WEL, SEC. 12, T12N, R10E, UM ~., -J~~-~ ~fjfDi At total depth ~ ~¡rŒD'SU~¡; 592' NSL, 1582' WEL, SEC. 12, T12N, R10E, UM ¡ r,J~}"JJ-_... ~~.~J 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Seitat~..~~~ KBE = 67.1' ADL 380109 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 6-29-2002 7 -5-2002 7 -10-2002 17. Total Depth (MD+ TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey 8110 4189 FT 8110 4189 FT 0 Yes B No 22. Type Electric or Other Logs Run MWD , GR , RES, ABI/IFR I CASANDRA Classification of Service Well 7. Permit Number 202-132 8. API Number 50- 029-23098-00 9. Unit or Lease Name Milne Point Unit 10. Well Number MPS-23 11. Field and Pool Milne Point Unit I Schrader Bluff 15. Water depth, if offshore 16. No. of Completions Nt A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) 23. CASING SIZE 20" 7-5/8" 4-1/2" WT. PER FT. 92# 29.7# 12.6# GRADE H-40 L-80 L-80 CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE Surface 112' 42" 28' 5224' 9-7/8" 5126' 8104' 6-1/8" CEMENTING RECORD 260 sx Arctic Set (Approx.) 1060 sx Class PF 'L', 280 sx Class 'G' Uncemented Slotted Liner AMOUNT PULLED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner 25. 5230' - 81 02' 4224' - 4190' 26. TUBING RECORD SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 4571' 3-1/2",9.2#, L-80 4571' - 4637' ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 32 Bbls of Diesel PACKER SET (MD) 4585' MD TVD MD TVD 27. Date First Production September 2, 2002 Date of Test Hours Tested 9/3/2002 6 Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR OIL-BBL TEST PERIOD 2057 OIL-BBL GAs-McF 1051 GAs-McF WATER-BBL 2712 WATER-BBL CHOKE SIZE GAS-OIL RATIO 511 OIL GRAVITY-API (CORR) 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. SU~it~ titsV t D SEP 1 0 2002 No core samples were taken. ~ ~:-;~k~' Üi~ & Ga,§ (,;íWG ;.~¡~~;.i¡;:-:\~iW 6,l1ett{j("~f.i~:' Form 10-407 Rev. 07-01-80 1 ;'" ~ ¡; ':¡ i! "\ , '"\ '! \ G (v Submit In Duplicate ,~ ) ) 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. SBF2-NA 4514' 40521 SBF1-NB 45561 4076' SBE4-NC 4610' 41031 SBE2-NE 4636' 41141 SBE1-NF 47611 4159' TSBD-OA 48541 4183' TSBC 4961' 42031 TSBB-OB 51631 4220' KECEtVt;,O SEP 1 0 2002 ~ k.~k~ Oii 8. GrJS Com; ~,ü~w¡\¡~~~~iO ~nehnfRnr 31. List of Attachments: 32. I hereby certify that the foregoing is true and cqrrect to the best of my knowledge Signed Sandra ~~~&---litle Technical Assistant MPS-23 202-132 Well Number Permit No. I Approval No. Date CC1- cJq -DL Prepared By Name/Number: Sondra Stewman, 564-4750 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Legal Name: MPS-23 Common Name: MPS-23 Test Date 7/4/2002 Test Type FIT Test Depth (TfJlD) ..- ::1"~U:!øptt1{1YÐ).... 5,264.0 (ft) 4,226.0 (ft) - . - . -. - - --. - - - - -- - - -- -~ ~,u~~~~~Jì~;- - -bM-~:~tm~:f!6J~:-9t~~-(@J1Pl ~ 580 (psi) 2,556 (psi) _EMVV. . 11.64 (ppg) .. ~--.AMW- 9.00 (ppg) .- '-' Printed: 7/1512002 8:50:23 AM ) ) ,. , I, . , . :'11 ,: I \I¡:,I"I:. " : I .Q~rå~~Í1$$:~mørY$~"~ .. ,,' ',(:" " 1", .,' ~I 'j:1 ' "',: I 'II'" ",', '", ',' ",i' ",,' ;-," " ,'I'. I', ,.' 'I', 1< ",: ,1.1. ," ' " 'i',"" ,', , "" ,\. '",' 'I, ":1, I . :" '~. I " ::1/" Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-23 MPS-23 DRILL +COMPLETE DOYON DOYON 141 Start: 6/29/2002 Rig Release: 7/10/2002 Rig Number: 141 Spud Date: 6/29/2002 End: 7/10/2002 " " I.:, ,. £)e~grip~i()nofOper~tio'ns,', ' Date.' ',"From-To ' ;~OU~ ......"'a~3k, ,. qRqe'.N,r~r ' .: Phâs8'1. ": ,I I 1 ,I I ",' I', I ',"" . I I ., I I 6/29/2002 02:00 - 08:00 6.00 MOB P PRE MOVE RIG FROM MPS-11 TO MPS 23, RIG ACCEPT @ 08:00 6/29/02 08:00 - 13:00 5.00 RIGU P PRE RIG UP DIVERTER, DIVERTER FUCTION TEST WAS WITNESS BY JEFF JONES AOGC, 13:00 - 18:30 5.50 DRILL P INT1 PICKING UP 129 JTS 4" DRILL PIPE AND STAND IN DERRICK, 18:30 - 19:00 0.50 DRILL P INT1 SERVICE TOP DRIVE 19:00 - 20:00 1.00 DRILL P INT1 CHANGE OUT SAVER SUB ON TOP DRIVE 20:00 - 22:30 2.50 DRILL P INT1 MAKING UP BHA #1, UPLOAD MWD, TEST MUD LINES 22:30 - 00:00 1.50 DRILL P INT1 SPUD WELL, DIRECTIONAL DRILL FROM 112 TO 258, WITH 400 GALS MIN 1200 PSI 60 RPMS TQ 350 6/30/2002 00:00 - 00:30 0.50 DRILL P INT1 DIRECTIONAL DRILL FROM 258 TO 278, WITH 400 GALS MIN 1200 PSI 60 RPMS TO 350 00:30 - 01 :00 0.50 DRILL P INT1 RIG UP AND RUN GYRO SURVEY ON WIRE LINE TO 175' .5 WITH 355 AZIM 01 :00 - 16:30 15.50 DRILL P INT1 DIRECTIONAL DRILL FROM 278 TO 2772', WITH 500 GALS MIN, 2200 PSI, 60 TO 80 RPMS, TQ 3,000, AST 3, ART 8 16:30 - 18:00 1.50 DRILL P INT1 CIRC THREE BOTTOMS UP,STANDING BACK ONE STAND PER BOTTOMS, CIRC WITH 500 GALS MIN, 2200 PSI, 80 RPMS 18:00 - 20:00 2.00 DRILL P INT1 PUMPING OUT TO HWP WITH FULL DRILLING RATE 20:00 - 21 :30 1.50 DRILL P INT1 TRIP OUT WITH BHA 21 :30 - 22:30 1.00 DRILL P INT1 CUT DRILLING LINE 200 FT. 22:30 - 23:30 1.00 DRILL P INn TRIPPING IN WITH BIT #2, WASH 90 FT TO BOTTOM 23:30 - 00:00 0.50 DRILL P INT1 DIRECTIONAL DRILL FROM 2772' TO 2800', WITH 500 GALS MIN, 2400 PSI, 80 RPMS, TQ 4,000 7/112002 00:00 - 00:00 24.00 DRILL P INT1 DIRECTIONAL DRILL FROM 2800' TO 5165, WITH 500 GALS MIN, 3200 PSI, 80 RPMS, TO 6,000 AST 12.5 ART 4 7/2/2002 00:00 - 02:00 2.00 DRILL P INT1 DIRECTIONAL DRILL FROM 5165' TO 5234'.80 RPM 500 GPM 3200 PSI 23-35K WOB. 02:00 - 04:00 2.00 CASE P INT1 CIRCULATE AND CONDITION HOLE FOR TRIP. STAND BACK ONE STAND EVERY BOTTOMS UP. CIRCULATED 3200 PSI 500 GPM 100 RPM. 04:00 - 08:30 4.50 CASE P INT1 PUMPED OUT TO HWDP WITH FULL DRILLING RATE. 08:30 - 11 :30 3.00 CASE P INT1 LAY DOWN BHA 11 :30 - 12:00 0.50 CASE P INT1 TRIPPING IN WITH 9 7/8 HOLE OPENER 12:00 - 12:30 0.50 CASE P INn SERVICE RIG 12:30 - 14:00 1.50 CASE P INT1 TRIP IN TO 3,500' 14:00 - 19:00 5.00 CASE P INT1 WASH AND REAM FROM 3,500 TO 5234 WITH HOLE OPENER 530 GALS MIN 2200 PSI 150 RPMS TQ 5,000 19:00 - 22:00 3.00 CASE P INT1 CIRC THREE BOTTOMS UP WITH 530 GALS MIN. 2200 PSI 150 RPMS, SLUG PIPE 22:00 - 00:00 2.00 CASE P INT1 TRIPPING OUT FOR CSG ( NO PROBLEMS) 7/3/2002 00:00 - 01 :30 1.50 CASE P INT1 TRIPPING OUT FOR CSG, LAYING DOWN HWDP 01 :30 - 02:30 1.00 CASE P INT1 PJSM, RIG UP TO RUN 7.62529# L-80 CSG 02:30 - 07:30 5.00 CASE P INT1 RUNNING 7.62529# L-80 CSG TOAL 125 JTS SHOE 5224, FLOAT 5138 STRING WT 100,000 07:30 - 08:00 0.50 CEMT P INT1 RIG DOWN FRANKS TOOL, RIG UP CEMENT HEAD 08:00 - 10:30 2.50 CEMT P INT1 CIRC, THIN MUD FOR CEMENT JOB 10:30 - 14:00 3.50 CEMT P INT1 CEMENT, PUMPED 1060 SX L MIXED @ 10.7, 783 BBLS SLURRY MIXED @ 6.5 BBlS MIN, TAILED 280 SXS CLASS G MIXED 15.857 BBLS SLURRY, MIXED 5.5 BBLS MIN. Printed: 7/1512002 8:52:06 AM ) ') 1'1', ',1,1 " ' , ,taft ,,'.' I I I I I ':,1 I ...øþ~r~~~~.~.$~.,.~~~~~~~.'..." Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: :: I I MPS-23 MPS-23 DRILL +COMPLETE DOYON DOYON 141 Start: 6/29/2002 Rig Release: 7/10/2002 Rig Number: 141 Spud Date: 6/29/2002 End: 7/10/2002 . I ',II, "'1: ,II I I I "I" ,'Q~t~. ',F:fåm,~TQ'.' HC)~fs;.:(task ,Códê ,.~.iPT . Pha$e,. ;' " I 'I ,I' ',', " I .': ' \ :.,': "I"" "", I,,' " 7/3/2002 7/4/2002 7/5/2002 7/6/2002 10:30 - 14:00 14:00 - 15:00 15:00 -18:00 18:00 -18:30 18:30 - 21 :00 21 :00 - 00:00 00:00 - 01 :30 01 :30 - 04:00 04:00 - 05:30 05:30 - 06:00 06:00 - 07:00 07:00 - 08:30 08:30 - 09:30 09:30 - 1 0:00 10:00 - 11 :00 11 :00 - 11 :30 11 :30 - 12:30 12:30 - 00:00 00:00 - 18:00 18:00 - 20:00 20:00 - 22:30 22:30 - 23:30 23:30 - 00:00 00:00 - 02:00 02:00 - 04:30 04:30 - 06:00 06:00 - 08:00 08:00 - 11 :30 11 :30 -13:30 13:30 - 14:30 3.50 CEMT P INT1 1.00 CEMT P 3.00 CASE P 0.50 CASE P 2.50 CASE P 3.00 CASE P INT1 INT1 INT1 INT1 INT1 1.50 CASE P 2.50 CASE P INT1 INT1 1.50 CASE P 0.50 CASE P 1.00 CASE P 1.50 CASE P INT1 INn INT1 INT1 1.00 CASE 0.50 CASE 1.00 CASE 0.50 DRILL 1.00 DRILL 11.50 DRILL P P P P P P INT1 INT1 INT1 PROD1 PROD1 PROD1 18.00 DRILL P PROD1 2.00 CASE P COMP 2.50 CASE P COMP 1.00 CASE P 0.50 CASE P COMP COMP 2.00 CASE P COMP 2.50 CASE P CaMP 1.50 CASE P 2.00 CASE P 3.50 CASE P COMP COMP COMP 2.00 CASE P 1.00 CASE P COMP COMP ',ÐesÞriptiQdbfQp~r~dions ,,' ,,:, 1,."," ,II".",;,,:' ',' "",,' ,,: ,', ','" L, ", DISPLACE WITH 9.2 MUD 6 BBLS MIN. BUMP PLUG WITH 1700 PSI, FULL RETURNS TRU OUT JOB, 320 BBLS OF GOOD CEMENT TO SURFACE. CIP@ 13:55 HRS 7/3/2002 RIG DOWN LANDING JT AND CEMENT HEAD NIPPLE DOWN DIVERTER NIPPLE UP FMC GEN. 6 HEAD AND TEST 1000# NIPPLE UP 13 5/8 5000# BOPS TEST BOPS 250 LOW, 4000 HIGH, ANNULAR 250/2500 WITNESS OF BOP TEST WAS WAVIER BY JEFF JONES AOGC 19:15 HRS 7/2/2002 TESTING BOPS, INSTALL WEAR RING PICKING UP BHA 6.125 2643 SEC. ,4 3/4 SERRYDRILL 1.5 BEND, 4 3/4 SP4 RES/GRAMMAlDM,HANG OFF SUB,3 FLEX COLLARS,JARS,XO TRIPPING IN TO 5100 CIRC. TEST CSG TO 4,000# FOR 30 MIN. DRILL CEMENT FLOAT AND SHOE AND 30 FT NEW HOLE TO 5264 CIRC BOTTOMS UP FIT TEST WITH 580 PSI 9.0 MUD WT. 4226 lVD= 11.6 EMW DISPLACE WELL WITH 9.1 FLO-PRO MUD DIRECTIONAL DRILL 5264 TO 5277 BIT TRYING TO PLUG CLEAN PUMP SUCTIONS OF GRAVEL DIRECTIONAL DRILL 5277 TO 6326 WITH 250 GALS MIN. 1700 PSI 1 0,000 BIT WT. 75 RPMS TO 5,000 AST 3.5 ART 4.25 DIRECTIONAL DRILL 6326 TO TD @ 8110 WITH 250 GALS MIN. 2000 PSI 1 0,000 BIT WT. 75 RPMS TO 5,000 AST2.5 ART 8 CROSS FAULT @ 7,695 LEFT SAND WENT INTO SHALE, WENT TO 100 DEGREES FOUND SAND @ 7850 CIRC THREE BOTTOMS UP WITH 280 GALS MIN, 2200 PSI, 100 RPMS PUMPING OUT TO CSG SHOE @ 5224 WITH FULL DRILLING RATE, MAKING SHORT TRIP DUE TO SHALE IN WELL BORE TRIP BACK TO BOTTOM (NO PROBLEMS) CIRC THREE BOTTOMS UP WITH 280 GALS MIN, 2200 PSI, 100 RPMS CIRC THREE BOTTOMS UP, WITH 280 GALS MIN., 2200 PSI 1 00 RPMS, SPOT NEW MUD TO BIT PUMPING UP INTO CSG @ 5224 DISPLACING HOLE WITH NEW MUD MONITOR WELL, SLUG PIPE, TRIPPING OUT FOR LINER LAY DOWN BHA PICK UP LINER, 4.512.6#,L-80,IBT- 98 JTS SLOTTED, TWO JTS SOLID, BAKER HMC LINER HANGER, BAKER ZXP LINER TOP PACKER, WITH TWO CENTRALIZERS PER JT ON SLOTTED TRIP IN HOLE WITH LINER ( NO PROBLEMS) DROP BALL AND SET LINER PACKER AND HANGER LINER TOP @ 5125.98 SHOE @ 8103.49 Printed: 7/1512002 8:52:06 AM ") ) 'I' I I 'II , ;, I" I . ..,8P,. ... OP~"'~";$b~riI.~fi~Pørt ... " :;""¡,,.,,' ":" :',/L'''''''''I''''''''':,'''','',",'~I'I''I':'I'''' "",:':"':<""">'' ;"", "I:"i"':,"<"~'''''(''':''I'' I '.':"':": ': ""':",,;:,,:, Legal Well Name: MPS-23 Common Well Name: MPS-23 Event Name: DRILL +COMPLETE Contractor Name: DOYON Rig Name: DOYON 141 . I " J I L I I II II 'I' 1'11.1' I I I ' 'I" I ,I I I',. I'r " . . "þ,ate,.':,I ., }~~tpt'1;1~:Td, ,.HÇUrs:':Tå~k':.,C9d~ "NPT.':'f?ha$è' ,'I " "I '1",,1,'1 ' ',"1""" I ':",1," "',1' ",II, I" ", I' 7/6/2002 14:30 - 15:30 1.00 CASE P 15:30 - 17:30 2.00 CASE P 17:30 - 20:30 3.00 STWHIP P 20:30 - 22:30 2.00 STWHIP P 22:30 - 23:00 0.50 STWHIP P 23:00 - 00:00 1.00 STWHIP P 7/7/2002 00:00 - 02:30 2.50 STWHIP P 02:30 - 04:00 1.50 STWHIP P 04:00 - 06:30 2.50 STWHIP P 06:30 - 07:00 0.50 STWHIP P 07:00 - 10:30 3.50 STWHIP P COMP COMP PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 PROD2 7/8/2002 10:30 - 00:00 13.50 DRILL P 00:00 - 17:00 17.00 DRILL P 17:00 - 18:00 1.00 CASE P 18:00 - 19:00 1.00 CASE P 19:00 - 21 :00 2.00 CASE P 21 :00 - 00:00 3.00 CASE P 00:00 - 00:30 0.50 CASE P 00:30 - 02:30 2.00 CASE P 02:30 - 03:30 1.00 CASE P 03:30 - 05:30 2.00 CASE P 05:30 - 06:00 0.50 CASE P 06:00 - 08:00 2.00 CASE P 08:00 - 10:30 2.50 CASE P 10:30 - 11 :00 0.50 CASE P 11 :00 - 14:30 3.50 CASE P 14:30 - 16:30 2.00 CASE P 16:30 - 18:00 1.50 CASE P PROD2 PROD2 COMP COMP COMP COMP 7/9/2002 COMP COMP COMP COMP COMP CaMP COMP COMP COMP COMP COMP Start: 6/29/2002 Rig Release: 7/10/2002 Rig Number: 141 Spud Date: 6/29/2002 End: 7/10/2002 ,'. .'. ,,' I I I I. I I I I I I . I :. "Øesâtiption'.()f(~perat¡()ns L I : I I I ~ I I ¡""I' I ¡" I" ' I I " I I ' ",,'': II' ' ' . I I PULL ONE STAND, CUT DRILLING LINE TRIPPING OUT WITH RUNNING TOOL AND LAY DOWN RUNNING TOOL PICK UP 258.19 FT OF 3.5 TAIL PIPE AND WHIPSTOCK AND MILLS AND BHA TRIPPING IN HOLE WITH WHIP STOCK ORIENT AND SET WHIPSTOCK @ 4859 10 DEGREE TO THE LEFT OF HIGH SIDE AND SHEAR OFF (TOP OF OA SAND 4856) MILLING WINDOW @ 4859 TO 4866 WITH 270 GALS MIN 1400 PSI,50 RPMS 1- 4,000 BIT WT. MILLING WINDOW @ 4866 TO 4890 WITH 270 GALS MIN 1400 PSI, 70 RPMS 1- 4,000 BIT WT TOP OF WINDOW 4859 BOTTOM 4871 CIRC, WORK WINDOW, PUMP HIGH VIS PILL TRIPPING OUT FOR BHA FLUSH BOPS WITH JOHNNY WHACKER PICK UP BHA TRIP INTO TOP OF WHIPSTOCK, ORIENT AND WENT THRU WINDOW @ 4859, WASH AND REAMED TO 4890 DIRECTIONAL DRILL 4890 TO 6463 WITH 80 RPMS, 250 GPM, 1650 PSI DIRECTIONAL DRILL 6463 TO TD @ 8082 WITH 80 RPMS, 250 GPM, 1650 PSI AST 4 ART 7.25 CIRC ONE BOTTOMS WITH 100 RPMS 280 GPM 2000 PSI SIX STAND SHORT TRIP, PUMPING OUT WITH FULL DRILLING RATE, NO PROBLEMS CIRC THREE BOTTOMS UP WITH 100 RPMS 280 GPM 2000 PSI PUMPING OUT TO WINDOW @ 4859, DISPLACING HOLE WITH NEW MUD CON'T PUMP OUT TO 4950' - PULL WITHOUT PUMP ONE STAND INTO CASING @ 4857' OBSERVE WELL - PUMP DRY JOB - PULL OUT OF HOLE LD BHA - DOWNLOAD MWD MU BAKER RETRIEVING ASSEMBLY - RIH TO 4859' WITH RETRIEVING TOOL LATCH - RETRIEVE WHIPSTOCK OBSERVE WELL - PUMP DRY JOB - POH WITH WHIPSTOCK LD BAKER WHIPSTOCK - SPACER DRILL PIPE - BAKER RETRIEVING ASSEMBLY CLEAR FLOOR - RIG UP TO RUN 4.5" SLOTTED LINER PU 90 JOINTS 4.5" SLOTTED LINER - BAKER HOOK WALL HANGER ASSEMBLY - TOTAL FOOTAGE RAN 3172' - RIG DOWN CASING RUNNING TOOLS - CLEAR FLOOR RIH WITH LINER TO WINDOW - ORIENT - EXIT WINDOW ON 2ND ATTEMPT CON'T RIH WITH LINER - HOOK WALL HANGER SET DOWN ON WINDOW 10' HIGH - WORK LINER TO GET HANGER THROUGH WINDOW - WORK UNTIL LINER HANGER PASSED WINDOW TO 4881' - ORIENT HANGER AND HANG AT 4871' - SLACK OFF 35K ON HOOK - PUMP Printed: 7/1512002 8:52:06 AM ) ) ~ I l " I: ,0,:1, BP,.,. , .. \~tffl!~~i~~~'.~~~~~(~~~~#;...' ... " 'i " , Legal Well Name: MPS-23 Common Well Name: MPS-23 Event Name: DRILL +COMPLETE Contractor Name: DOYON Rig Name: DOYON 141 , ",,:',' ':1",11" I I '11',1 'I I ',' ,I II I I ., D~Ì(i~:' ,II, ' , Fråm;Ä7[o:',H.()ûrs' .'.., Tåsk ; . GQð~' ':~'p~, " I .1,' " ,: I ;' I, I ' 'I, '., ',."' I. I I I I" ,:., I ",'" .' . " I I I I r' ,.. I I', . . PI, ,: i ' I . I ::.' '. .: ,I. 'I, .' , I ' I " I~' " '. I" : " I" I I " '': I I I I I I '. " I I ',' 7/9/2002 16:30 - 18:00 18:00 - 21 :00 21 :00 - 21 :30 21 :30 - 23:30 23:30 - 00:00 7/10/2002 00:00 - 02:30 02:30 - 03:00 03:00 - 05:00 05:00 - 05:30 05:30 - 06:30 06:30 - 14:00 1.50 CASE P 3.00 CASE P 0.50 CASE P 2.00 RUNCOfvP 0.50 RUNCOfvP 2.50 RUNCOrvP 0.50 RUNCOrvP 2.00 RUNCOrvP 0.50 RUNCO~P 1.00 RUNCOrvP 7.50 RUNCOrvP Spud Date: 6/29/2002 End: 7/10/2002 Start: 6/29/2002 Rig Release: 7/10/2002 Rig Number: 141 'Rhåsé, ." . 'bès'c,'fiP'ì. iO, 'n,':o,fOP' er~ti, QOS ,: , " . ,',', I " I . I I : /'."':,,' ,.,' I II' I I I I' , I' I 1"1, ","~ '1'1'"",... 1":,",'1,': ',",": 'I'," ',1'1',' 'r 'I""":'" ':. I COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP COMP 14:00 - 15:00 1.00 BOPSUR.P COMP 15:00 - 17:00 2.00 WHSUR P COMP 17:00 - 20:30 3.50 RIGD P COMP 20:30 - 22:00 1.50 RIGD P COMP 22:00 - 00:00 2.00 RIGD P COMP BAll TO SEAT - PRESSURE UP TO 2800 - RELEASE HR TOOL - PU CHECK WEIGHT LOSS (20K) - BLOW BALL SEAT 4200 - PU PULL TORQUE TUBE - PUMP DRY JOB POH - LD 4" DRILL PIPE - STANDING BACK 51 STANDS IN DERRICK LD LINER RUNNING TOOL - CLEAR FLOOR RIH TO 4770' BREAK CIRC - CIRCULATE - RIG UP TO DISPLACE WELL TO 9.2 BRINE DISPLACE WELL TO 8.8 SEAWATER - FLUSH KILL LINE WITH 8.8 SEAWATER - PUMP HI VIS SPACER - FOLLOWED BY 200 BBlS 8.8 SEAWATER - FOLLOWED BY 220 BBlS 9.2 BRINE - 420 GPM - 120 RPM OBSERVE WELL - WELL STATIC lD 4" DRill PIPE PUll WEAR RING RIG UP COMPLETION RUNNING EQUIPMENT - PJSM PU 112 JTS 4.5" TUBING PLUS COMPLETION ASSEMBLIES - MAKE UP TUBING HANGER WITH lWC INSTALLED - INSTALL CONTROL LINE -LAND TUBING - RUN IN LDS- BACK OUT LANDING JOINT - TEST lWC TO 1000 PSI NIPPLE DOWN BOP'S NIPPLE UP FMC TUBING HEAD ADAPTER - TEST PACK OFF & VOIDS TO 5K - ALL TEST WERE GOOD - NU CIW 4 1/16" TREE - TEST WITH HB&R TO 5K - OK CIRCULATE WELL FLUID TO 110 DEGREE GOING IN AND 100 DEGREE OUT WITH HB&R DROP BALL - PRESSURE UP TO 4000 PSI TO SET PACKER - HOLD / RECORD FOR 30 MINS - BLEED OFF TUBING PRESSURE TO 2500 PSI - PRESSURE UP ON ANNULUS TO 4500 PSI - HOLD / RECORD FOR 30 MINS - BLEED OFF TUBING TO 2200 PSI - RP VALVE SHEARED OUT - BLEED OFF PRESSURE ON TUBING / ANNULUS DISPLACE WELL WITH 32 BBLS DIESEL DOWN ANNULUS - U-TUBE FOR FREEZE PROTECTION -INSTALL BPV- SECURE WELL - RELEASE RIG @ 23:59 HRS Printed: 7/1512002 8:52:06 AM '\ AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-23 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 'MD , M D (if applicable) 8,110.00' MD ) a Od / 301.. 30-Jul-02 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED AUG 0 1 2002 Alaska Oil & Gas Cons. Coßlß1Î8lOn Anchorage Milne Point Unit BPXA Milne Point MPS, Slot MPS-23 MPS-23 Job No. AKZZ22108, Surveyed: 8 July, 2002 ð~~ ~-IA . 'lJ)~ ."1: BP EXPLORA T/ON (ALASKA) INC. -..' SURVEY REPORT 22 July, 2002 Your Ref: API 500292309800 Surface Coordinates: 5999959.54 N, 565758.11 E (70024' 37.1981" H, 149027' 52.3786" W) Kelly Bushing: 67. 10ft above Mean Sea Level ~~"' spel'l'Y-SUI! DRILLING SERVices A Halliburton Company 5U1vey Ref: 5vy10136 Sperry-Sun Drilling Services () . Survey Report for MPS-23 ~~ q)~ Your Ref: API 500292309800 Job No. AKZZ22108, Surveyed: 8 July, 2002 BP EXPLORATION (ALASKA) INC. . I~ BPXA Milne Point Unit e Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 0.00 0.000 0.000 -67.1 0 0.00 0.00 N O.OOE 5999959.54 N 565758.11 E 0.00 Tolerable Gyro 175.00 0.500 324.000 107.90 175.00 0.62 N 0.45W 5999960.15 N 565757.66 E 0.286 -0.35 AK-6 BP _IFR-AK 295.91 0.910 15.480 228.80 295.90 1.97 N 0.50W 5999961.51 N 565757.59 E 0.591 -1.53 ~~ 384.24 0.120 4.140 317.13 384.23 2.74 N 0.31 W 5999962.28 N 565757.78 E 0.897 -2.31 472.78 0.170 252.360 405.67 472.77 2.79 N 0.43 W 5999962.33 N 565757.66 E 0.273 -2.30 562.82 0.140 232.230 495.70 562.80 2.68 N O.64W 5999962.22 N 565757.44 E 0.069 -2.11 654.14 0.220 219.640 587.02 654.12 2.48 N O.84W 5999962.01 N 565757.25 E 0.097 -1.83 746.04 0.250 216.050 678.92 746.02 2.18 N 1.07W 5999961.71 N 565757.02 E 0.036 -1.46 840.01 0.630 209.330 772.89 839.99 1.57 N 1.45 W 5999961.09 N 565756.65 E 0.407 -0.75 934.28 0.960 208.410 867.15 934.25 0.42 N 2.08W 5999959.94 N 565756.03 E 0.350 0.56 1027.66 0.330 43.930 960.53 1027.63 0.088 2.26W 5999959.44 N 565755.85 E 1.372 1.09 1120.67 0.550 51.610 1053.54 1120.64 0.39 N 1.73W 5999959.92 N 565756.38 E 0.244 0.42 1213.93 0.840 54.980 1146.79 1213.89 1.07 N 0.81 W 5999960.60 N 565757.29 E 0.314 -0.58 1307.31 1.440 16.510 1240.15 1307.25 2.58 N 0.08E 5999962.12 N 565758.17 E 1.007 -2.34 1401.10 4.020 348.600 1333.83 1400.93 6.94 N 0.24W 5999966.4 7 N 565757.81 E 3.016 -6.09 1494.56 3.890 335.230 1427.07 1494.17 13.03 N 2.21 W 5999972.55 N 565755.78 E 0.994 -10.63 1587.80 4.620 307.150 1520.06 1587.16 18.17 N 6.53W 5999977.65 N 565751.42 E 2.339 -13.28 1681.47 5.240 303.540 1613.38 1680.48 22.81 N 13.10 W 5999982.23 N 565744.81 E 0.740 -14.46 1775.35 5.430 318.290 1706.86 1773.96 28.49 N 19.63 W 5999987.86 N 565738.23 E 1.471 -16.59 1868.80 5.530 319.730 1799.88 1866.98 35.23 N 25.48 W 5999994.54 N 565732.32 E 0.182 -19.97 -- 1962.18 5.820 321.980 1892.81 1959.91 42.39 N 31.31 W 6000001.65 N 565726.43 E 0.391 -23.74 2055.35 7.270 321.450 1985.37 2052.47 50.72 N 37.89 W 6000009.93 N 565719.77 E 1.558 -28.21 2148.49 11.540 320.000 2077.23 2144.33 62.48 N 47.56 W 6000021.59 N 565710.00 E 4.591 -34.35 2242.18 16.850 320.820 2168.03 2235.13 80.19 N 62.17 W 6000039.18 N 565695.24 E 5.672 -43.58 2335.61 21.720 321.930 2256.19 2323.29 104.31 N 81.40 W 6000063.13 N 565675.80 E 5.227 -56.45 2428.77 24.400 322.820 2341.90 2409.00 133.22 N 103.66 W 6000091.84 N 565653.28 E 2.901 -72.23 2523.29 29.400 321.660 2426.17 2493.27 167.00 N 129.87 W 6000125.39 N 565626.78 E 5.319 -90.57 2616.90 33.550 321.380 2505.99 2573.09 205.24 N 160.28 W 6000163.36 N 565596.03 E 4.436 -111.01 2709.95 36.970 320.660 2581.96 2649.06 246.99 N 194.07 W 6000204.81 N 565561.87 E 3.702 -133.05 2799.73 34.970 320.970 2654.61 2721.71 287.86 N 227.39 W 6000245.38 N 565528.19 E 2.237 -154.53 -------------- -----_.- 22 July, 2002 - 14:15 Page 20'6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-23 Ds~ Your Ref: API 500292309800 Job No. AKZZ2210B, Surveyed: B July, 2002 BP EXPLORATION (ALASKA) INC. W~~ BPXA Milne Point Unit ~oint MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 2893.38 32.610 319.580 2732.44 2799.54 327.92 N 260.66 W 6000285.15 N 565494.57 E 2.652 -175.30 2986.70 33.560 319.960 2810.63 2877.73 366.81 N 293.56 W 6000323.75 N 565461.33 E 1.042 -195.20 3080.43 35.140 320.030 2888.01 2955.11 407.32 N 327.56 W 6000363.96 N 565426.98 E 1.686 -216.05 3173.36 35.900 319.710 2963.65 3030.75 448.60 N 362.36 W 6000404.94 N 565391.82 E 0.842 -237.22 3266.63 37.110 319.380 3038.62 3105.72 490.82 N 398.36 W 6000446.83 N 565355.45 E 1.314 -258.69 3360.46 33.860 317.650 3115.01 3182.11 531.64 N 434.41 W 6000487.33 N 565319.04 E 3.625 -278.89 3453.84 33.650 316.120 3192.65 3259.75 569.51 N 469.86 W 6000524.89 N 565283.25 E 0.938 -296.72 3547.11 33.060 311.380 3270.57 3337.67 604.96 N 506.87 W 6000560.01 N 565245.93 E 2.864 -311.70 3640.38 33.530 299.890 3348.61 3415.71 634.64 N 548.34 W 6000589.33 N 565204.21 E 6.773 -319.51 3733.93 35.150 290.870 3425.90 3493.00 657.13 N 595.93 W 6000611.40 N 565156.41 E 5.703 -318.14 3827.26 37.380 283.340 3501.18 3568.28 673.25 N 648.64 W 6000627.05 N 565103.57 E 5.333 -308.78 3920.09 40.410 276.780 3573.46 3640.56 683.31 N 705.97 W 6000636.61 N 565046.15 E 5.505 -291.93 4013.77 40.380 265.150 3644.91 3712.01 684.33 N 766.45 W 6000637.09 N 564985.67 E 8.037 -265.60 4107.22 41.870 253.460 3715.40 3782.50 672.87 N 826.60 W 6000625.11 N 564925.62 E 8.371 -228.27 4200.88 45.630 248.030 3783.07 3850.17 651.44 N 887.65 W 6000603.14 N 564864.76 E 5.671 -181.62 4294.70 48.490 244.000 3846.99 3914.09 623.48 N 950.35 W 6000574.63 N 564802.31 E 4.379 -128.41 4388.08 49.630 243.970 3908.18 3975.28 592.54 N 1013.74 W 6000543.13 N 564739.19 E 1.221 -72.23 4480.91 52.390 241.700 3966.59 4033.69 559.58 N 1077.91 W 6000509.61 N 564675.32 E 3.528 -13.90 4574.51 58.840 237.300 4019.44 4086.54 520.32 N 1144.34 W 6000469.76 N 564609.23 E 7.905 51.09 4667.89 67.590 232.120 4061.50 4128.60 472.11 N 1212.20 W 6000420.96 N 564541.80 E 10.594 124.71 4'(61.53 73.980 229.690 4092.31 4159.41 416.35 N 1280.76 W 6000364.60 N 5644 73. 73 E 7.250 205.37 4854.77 76.650 228.080 4115.94 4183.04 357.05 N 1348.70 W 6000304.70 N 564406.32 E 3.315 288.93 4942.95 79.290 224.410 4134.33 4201.43 297.41 N 1410.97 W 6000244.51 N 564344.58 E 5.053 370.22 5037.31 88.090 223.320 4144.69 4211.79 2~9.85 N 1475.89 W 6000176.39 N 564280.26 E 9.396 459.79 5"135.61 85.200 218.970 4150.44 4217.54 155.98 N 1540.44 W 6000101.95 N 564216.36 E 5.306 554.82 5169.65 83.780 217.340 4153.71 4220.81 129.34 N 1561.37 W 6000075.13 N 564195.66 E 6.334 588.03 5275.27 90.250 215.290 4159.21 4226.31 44.40 N 1623.79 W 5999989.64 N 564133.99 E 6.425 691.99 5323.14 91.790 208.970 4158.35 4225.45 3.89 N 1649.24 W 5999948.91 N 564108.90 E 13.586 739.62 5368.64 92.090 202.580 4156.81 4223.91 37.04 S 1669.00 W 5999907.81 N 564089.50 E 14.051 785.06 5419.15 90.490 196.580 4155.67 4222.77 84.59 S 1685.91 W 5999860.11 N 564073.01 E 12.291 835.14 - ---- -~-------~--~-- ---- ---.--- -- 22 July, 2002 - 14:15 Page 3 of6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services D.. . Survey Report for MPS-23 ~~~ Your Ref: API 500292309800 Job No. AKZZ22108, Surveyed: 8 July, 2002 BP EXPLORATION (ALASKA) INC. r~t{in~=~~ Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 5462.01 89.450 194.120 4155.70 4222.80 125.92 S 1697.26 W 5999818.68 N 564062.03 E 6.231 877.14 5507.46 90.490 188.090 4155.72 4222.82 170.50 S 1706.01 W 5999774.03 N 564053.67 E 13.463 920.88 5555.74 90.980 180.750 4155.10 4222.20 218.60 S 1709.73 W 5999725.90 N 564050.38 E 15.236 965.50 5605.09 92.280 179.120 4153.70 4220.80 267.93 S 1709.67 W 5999676.57 N 564050.87 E 4.224 1009.51 5649.47 92.650 179.420 4151.79 4218.89 312.26 S 1709.10 W 5999632.24 N 564051.82 E 1.073 1048.83 5698.45 92.580 178.900 4149.55 4216.65 361.198 1708.39 W 5999583.33 N 564052.97 E 1.070 1092.19 5742.33 94.370 178.580 4146.89 4213.99 404.97 S 1707.42 W 5999539.55 N 564054.32 E 4.144 1130.84 5789.80 92.830 177.940 4143.91 4211.01 452.33 8 1705.99 W 5999492.21 N 564056.17 E 3.512 1172.47 5835.48 89.690 177.110 4142.91 4210.01 497.95 S 1704.01 W 5999446.61 N 564058.55 E 7.110 1212.31 5883.60 89.940 176.850 4143.06 4210.16 546.00 S 1701.48 W 5999398.58 N 564061.50 E 0.750 1254.06 5929.48 90.490 176.360 4142.89 4209.99 591.80 8 1698.76 W 5999352.81 N 564064.62 E 1.606 1293.73 5976.87 89.940 176.550 4142.71 4209.81 639.108 1695.83 W 5999305.54 N 564067.97 E 1.228 1334.63 6023.18 89.880 181.090 4142.79 4209.89 685.38 S 1694.88 W 5999259.26 N 564069.33 E 9.804 1375.53 6072.67 89.690 180.960 4142.97 4210.07 734.87 S 1695.76 W 5999209.77 N 564068.88 E 0.465 1420.10 6115.87 88.710 179.530 4143.58 4210.68 778.06 S 1695.95 W 5999166.58 N 564069.08 E 4.013 1458.74 6165.86 88.770 182.620 4144.68 4211.78 828.02 S 1696.89 W 5999116.61 N 564068.58 E 6.181 1503.77 6209.15 91.600 183.920 4144.54 4211.64 871.24 S 1699.35 W 5999073.38 N 564066.49 E 7.194 1543.46 6258.36 91.850 183.110 4143.05 4210.15 920.33 S 1702.37 W 5999024.26 N 564063.91 E 1.722 1588.65 6303.61 89.940 184.540 4142.35 4209.45 965.47 8 1705.39 W 5998979.09 N 564061.29 E 5.273 1630.31 6352.40 89.320 184.000 4142.66 4209.76 1014.128 1709.02 W 5998930.41 N 564058.08 E 1.685 1675.38 6397.03 90.250 183.320 4142.83 4209.93 1058.66 S 1711.87 W 5998885.85 N 564055.63 E 2.581 1716.42 6446.91 90.620 183.540 4142.45 4209.55 1108.458 1714.85 W 5998836.03 N 564053.08 E 0.863 1762.22 6490.47 90.060 183.420 4142.19 4209.29 1151.938 1717.50 W 5998792.53 N 564050.82 E 1.315 1802.22 6538.12 89.880 184.590 4142.22 4209.32 1199.46 S 1720.83 W 5998744.97 N 564047.91 E 2.484 1846.16 6584.23 90.310 184.760 4142.14 4209.24 1245.42 S 1724.58 W 5998698.98 N 564044.56 E 1.003 1888.88 6633.86 90.060 185.310 4141.98 4209.08 1294.86 S 1728.94 W 5998649.51 N 564040.64 E 1.217 1934.98 6677.15 90.180 186.110 4141.89 4208.99 1337.93 S 1733.25 W 5998606.40 N 564036.71 E 1.869 1975.37 6724.81 91.110 181.630 4141.35 4208.45 1385.47 S 1736.46 W 5998558.84 N 564033.91 E 9.600 2019.26 6770.59 90.550 176.490 4140.69 4207.79 1431.22 S 1735.71 W 5998513.09 N 564035.07 E 11.293 2059.77 6812.62 90.250 173.110 4140.40 4207.50 1473.078 1731.90 W 5998471.28 N 564039.24 E 8.073 2095.41 ------ -~- .--- 22 July, 2002 - 14:15 Page 4 0'6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services DS . .~~. Survey Report for MPS-23 Your Ref: API 500292309800 Job No. AKZZ22108, Surveyed: 8 July, 2002 rJìþs BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (° /1 OOft) 6863.97 88.220 167.590 4141.08 4208.18 1523.67 S 1723.30 W 5998420.76 N 564048.29 E 11 .452 2136.70 6915.75 86.120 167.910 4143.64 4210.74 1574.20 S 1712.33 W 5998370.32 N 564059.71 E 4.102 2176.88 6957.79 85.930 168.380 4146.55 4213.65 1615.25 S 1703.71 W 5998329.35 N 564068.68 E 1.203 2209.64 -" 7006.45 88.150 167.620 4149.07 4216.17 1662.78 S 1693.61 W 5998281.91 N 564079.21 E 4.822 2247.52 7051.11 89.510 167.670 4149.98 4217.08 1706.39 S 1684.06 W 5998238.39 N 564089.14 E 3.047 2282.15 7099.46 89.450 167.060 4150.42 4217.52 1753.57 S 1673.48 W 5998191.30 N 564100.13 E 1.268 2319.50 7144.70 90.000 167.780 4150.63 4217.73 1797.72 S 1663.63 W 5998147.24 N 564110.38 E 2.003 2354.48 7193.97 88.830 163.420 4151.14 4218.24 1845.43 S 1651.38 W 5998099.64 N 564123.04 E 9.162 2391.55 7237.92 88.830 162.830 4152.03 4219.13 1887.48 S 1638.62 W 5998057.71 N 564136.17 E 1.342 2423.34 7286.66 86.980 162.450 4153.82 4220.92 1933.97 S 1624.09 W 5998011.35 N 564151.11 E 3.875 2458.30 7331.49 86.550 162.680 4156.35 4223.45 1976.67 S 1610.68 W 5997968.77 N 564164.90 E 1.087 2490.37 7380.49 87.600 161.230 4158.85 4225.95 2023.20 S 1595.52 W 5997922.38 N 564180.46 E 3.650 2525.08 7424.77 89.020 160.540 4160.15 4227.25 2065.01 S 1581.03 W 5997880.69 N 564195.32 E 3.565 2555.89 7473.38 89.380 160.390 4160.83 4227.93 2110.82 S 1564.78 W 5997835.02 N 564211.98 E 0.802 2589.46 7517.24 90.860 160.390 4160.74 4227.84 2152.14 S 1550.06 W 5997793.84 N 564227.06 E 3.374 2619.71 7565.51 91.170 159.230 4159.88 4226.98 2197.43 S 1533.40 W 5997748.69 N 564244.12 E 2.487 2652.64 7610.51 91.050 158.830 4159.01 4226.11 2239.44 S 1517.30 W 5997706.82 N 564260.59 E 0.928 2682.89 7660.62 90.920 158.390 4158.15 4225.25 2286.10 S 1499.02 W 5997660.33 N 564279.27 E 0.915 2716.31 7701.20 93.510 158.420 4156.58 4223.68 2323.80 S 1484.10W 5997622.77 N 564294.53 E 6.383 2743.24 7757.78 94.000 158.720 4152.88 4219.98 2376.35 S 1463.47 W 5997570.40 N 564315.62 E 1.015 2780.86 7796.38 98.760 157.680 4148.59 4215.69 2411.96 S 1449.23 W 5997534.92 N 564330.17 E 12.619 2806.23 7835.42 98.4 70 158.420 4142.74 4209.84 2447.76 S 1434.81 W 5997499.24 N 564344.91 E 2.016 2831.70 7890.92 100.100 157.620 4133.79 4200.89 2498.55 S 1414.31 W 5997448.64 N 564365.86 E 3.263 2867.80 7940.34 93.450 156.690 4127.96 4195.06 2543.75 S 1395.26 W 5997403.61 N 564385.30 E 13.585 2899.57 7983.33 91.720 157.760 4126.02 4193.12 2583.34 S 1378.64 W 5997364.16 N 564402.27 E 4.730 2927.43 8040.02 91.660 157.590 4124.35 4191.45 2635.76 S 1357.11 W 5997311.93 N 564424.26 E 0.318 2964.53 8110.00 91.660 157.590 4122.32 4189.42 2700.43 S 1330.45 W 5997247.50 N 564451.49 E 0.000 3010.24 Projected Survey -------~~- ------.---- ---- 22 July, 2002 - 14:15 Page 50'6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for MPS-23 Your Ref: API 500292309800 Job No. AKZZ2210B, Surveyed: B July, 2002 BP EXPLORATION (ALASKA) INC. Milne Point Unit All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 206.780° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 8110.00ft., The Bottom Hole Displacement is 3010.38ft., in the Direction of 206.229° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 8110.00 4189.42 2700.43 S 1330.45 W Projected Survey Survey tool program for MPS-23 From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 175.00 175.00 Tolerable Gyro 4189.42 AK-6 BP _IFR-AK 0.00 175.00 175.00 8110.00 -------"---~-~----- - ----------------. + 22 July, 2002. 14:15 Page 6 0'6 o~~. ~/.f q \7" ).", , . /~., ~ BPXA Milne Point MPS . DrillQuest 2.00.08.005 " ¿;; Od-13~ 30-Jul-02 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-23 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 'MD 'MD (if applicable) 8,110.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED t,UG 0 1 2002 Ala8ka Oil & Gas COns. Commission Anchorage . ðÞ- BP EXPLORA TION (ALASKA) INC. ~X)~ ~J>~ í$ Milne Point Unit BPXA Milne Point MPS, Slot MPS-23 MPS-23 MWD Job No. AKMW22108, Surveyed: 8 July, 2002 SURVEY REPORT 22 July, 2002 Your Ref: API 500292309800 Surface Coordinates: 5999959.54 N, 565758.11 E (70024' 37.1981" N, 149027' 52.3786" W) Kelly Bushing: 67. 10ft above Mean Sea Level SpE!r"'r"Y-!5LJ1! DRILLING seRVIc:es A Halliburton Company Survey Ref: svy10150 Sperry-Sun Drilling Services () . Survey Report for MPS-23 MWD Your Ref: API 500292309800 ~~ Job No. AKMW2210B1 Surveyed: 8 JulYI 2002 BP EXPLORATION (ALASKA) INC. ~~~tOin~~~~ Milne Point Unit ~~ Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 0.00 0.000 0.000 -67.10 0.00 0.00 N O.OOE 5999959.54 N 565758.11 E 0.00 Tolerable Gyro 175.00 0.500 324.000 107.90 175.00 0.62 N 0.45W 5999960.15 N 565757.66 E 0.286 -0.35 MWD Magnetic 295.91 0.910 16.110 228.80 295.90 1.97 N 0.49 W 5999961.50 N 565757.60 E 0.596 -1.53 ~7 384.24 0.120 4.470 317.13 384.23 2.73 N 0.29W 5999962.27 N 565757.80 E 0.898 -2.31 472.78 0.170 252.840 405.67 472.77 2.79 N 0.41 W 5999962.32 N 565757.68 E 0.273 -2.30 562.82 0.140 232.760 495.70 562.80 2.68N 0.62W 5999962.22 N 565757.46 E 0.068 -2.11 654.14 0.220 219.860 587.02 654.12 2.48 N 0.83W 5999962.01 N 565757.26 E 0.098 -1.84 746.04 0.250 216.320 678.92 746.02 2.18 N 1.06W 5999961.71 N 565757.03 E 0.036 -1.47 840.01 0.630 209.390 772.89 839.99 1.57 N 1.43W 5999961.09 N 565756.66 E 0.408 -0.75 934.28 0.960 208.880 867.15 934.25 0.42 N 2.07W 5999959.95 N 565756.04 E 0.350 0.55 1027.66 0.330 43.940 960.53 1027.63 0.07 S 2.26W 5999959.45 N 565755.85 E 1.372 1.08 1120.67 0.550 51.360 1053.54 1120.64 0.40 N 1.72W 5999959.93 N 565756.38 E 0.244 0.42 1213.93 0.840 54.550 1146.79 1213.89 1.08 N 0.82W 5999960.61 N 565757.28 E 0.314 -0.60 1307.31 1 .440 16.100 1240.15 1307.25 2.60 N 0.06E 5999962.14 N 565758.15 E 1.007 -2.35 1401.10 4.020 348.010 1333.83 1400.93 6.95 N 0.29W 5999966.49 N 565757.76 E 3.019 -6.08 1494.56 3.890 334.290 1427.07 1494.17 13.01 N 2.35W 5999972.53 N 565755.65 E 1.020 -10.56 1587.80 4.620 305.870 1520.06 1587.16 18.06 N 6.76W 5999977.54 N 565751.19 E 2.364 -13.08 1681 .4 7 5.240 302.670 1613.38 1680.48 22.58 N 13.42 W 5999982.00 N 565744.49 E 0.724 -14.11 1775.35 5.430 318.080 1706.86 1773.96 28.20 N 20.00 W 5999987.57 N 565737.87 E 1.535 -16.17 1868.80 5.530 319.720 1799.89 1866.99 34.93 N 25.86 W 5999994.24 N 565731.94 E 0.199 -19.53 ---~ 1962.18 5.820 322.090 1892.81 1959.91 42.10 N 31.68 W 6000001.36 N 565726.06 E 0.399 -23.31 2055.35 7.270 321.350 1985.37 2052.47 50.43 N 38.26 W 6000009.63 N 565719.40 E 1.559 -27.78 2148.49 11.540 320.300 2077.24 2144.34 62.20 N 47.90 W 6000021.32 N 565709.66 E 4.588 -33.95 2242.18 16.850 320.740 2168.03 2235.13 79.94 N 62.49 W 6000038.93 N 565694.92 E 5.669 -43.21 2335.61 21.720 321.850 2256.19 2323.29 104.04 N 81.75 W 6000062.85 N 565675.45 E 5.227 -56.04 2428.77 24.400 323.480 2341.90 2409.00 133.06 N 103.85 W 6000091.68 N 565653.09 E 2.957 -72.00 2523.29 29.400 321.750 2426.17 2493.27 166.99 N 129.85 W 6000125.38 N 565626.79 E 5.354 -90.57 2616.90 33.550 321.720 2505.99 2573.09 205.36 N 160.12W 6000163.48 N 565596.19 E 4.433 -111.19 2709.95 36.970 320.780 2581.96 2649.06 247.23 N 193.75 W 6000205.06 N 565562.19 E 3.721 -133.42 2799.73 34.970 321.850 2654.62 2721.72 288.38 N 226.71 W 6000245.92 N 565528.87 E 2.335 -155.30 - ----- -----~ -. ------ -- - -- ----- - 22 July, 2002 - 14:58 Page 20f6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services () . Survey Report for MPS-23 MWD Your Ref: API 500292309800 ~~~~ Job No. AKMW22108, Surveyed: 8 July, 2002 BP EXPLORATION (ALASKA) INC. rll" BPXA Milne Point Unit ~oint MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) COli OOft) 2893.38 32.610 320.570 2732.44 2799.54 328.99 N 259.32 W 6000286.23 N 565495.90 E 2.632 -176.86 2986.70 33.560 321.010 2810.63 2877.73 ~ 368.46 N 291.53 W 6000325.42 N 565463.35 E 1.050 -197.59 -. 3080.43 35.140 321.240 2888.01 2955.11 409.63 N 324.72 W 6000366.30 N 565429.80 E 1.691 -219.39 3173.36 35.900 320.760 2963.65 3030.75 451.59 N 358.70 W 6000407.95 N 565395.45 E 0.871 -241.54 3266.63 37.110 320.720 3038.62 3105.72 494.55 N 393.81 W 6000450.60 N 565359.96 E 1.298 -264.07 3360.46 33.860 318.920 3115.01 3182.11 536.18 N 428.92 W 6000491.92 N 565324.49 E 3.638 -285.41 3453.84 33.650 316.940 3192.65 3259.75 574.69 N 463.68 W 6000530.13 N 565289.39 E 1.199 -304.14 354 7.11 33.060 312.010 3270.57 3337.67 610.60 N 500.23 W 6000565.72 N 565252.52 E 2.974 -319.73 3640.38 33.530 298.100 3348.65 3415.75 639.81 N 541.92 W 6000594.55 N 565210.58 E 8.188 -327.01 3733.93 35.150 290.530 3425.93 3493.03 661.43 N 589.95 W 6000615.75 N 565162.36 E 4.879 -324.68 3827.26 37.380 283.140 3501.21 3568.31 677.30 N 642.73 W 6000631.16 N 565109.44 E 5.254 -315.06 3920.09 40.410 276.220 3573.49 3640.59 686.98 N 700.13 W 6000640.33 N 565051.96 E 5.702 -297.84 4013.77 40.380 264.990 3644.93 3712.03 687.62 N 760.62 W 6000640.43 N 564991.46 E 7.761 -271.16 4107.22 41.870 253.330 3715.42 3782.52 676.01 N 820.75 W 6000628.30 N 564931.44 E 8.351 -233.70 4200.88 45.630 247.170 3783.10 3850.20 654.04 N 881.59 W 6000605.79 N 564870.79 E 6.063 -186.67 4294.70 48.490 243.070 3847.02 3914.12 625.10 N 943.84 W 6000576.31 N 564808.80 E 4.418 -132.79 4388.08 49.630 243.800 3908.21 3975.31 593.56 N 1006.94 W 6000544.21 N 564745.99 E 1.356 -76.21 4480.91 52.390 241.920 3966.61 4033.71 560.63 N 1071.12W 6000510.72 N 564682.09 E 3.364 -17.89 4574.51 58.840 237.500 4019.46 4086.56 521.61 N 1137.70 W 6000471.11 N 564615.86 E 7.914 46.94 4667.89 67.590 232.710 4061.52 4128.62 473.88 N 1205.90 W 6000422.78 N 564548.08 E 10.426 120.29 4761.53 73.980 230.110 4092.33 4159.43 418.73 N 1274.95 W 6000367.03 N 564479.52 E 7.310 200.63 4854.77 76.650 228.810 4115.97 4183.07 360.11 N 1343.48 W 6000307.80 N 564411.51 E 3.165 283.84 4942.95 79.290 225.310 4134.35 4201.45 301.36 N 1406.59 W 6000248.50 N 564348.92 E 4.902 364.73 5037.31 88.090 223.860 4144.71 4211.81 234.62 N 1472.35 W 6000181.19 N 564283.75 E 9.450 453.93 5135.61 85.200 219.350 4150.47 4217.57 161.28 N 1537.49 W 6000107.27 N 564219.26 E 5.442 548.76 5169.65 83.780 217.740 4153.73 4220.83 134.78 N 1558.61 W 6000080.59 N 564198.38 E 6.290 581.93 5275.27 90.250 214.760 4159.23 4226.33 49.77 N 1620.93 W 5999995.03 N 564136.81 E 6.742 685.91 5323.14 91.790 208.930 4158.38 4225.48 9.13 N 1646.17 W 5999954.18 N 564111.92 E 12.594 733.56 5368.64 92.090 202.840 4156.84 4223.94 31.76 S 1666.01 W 5999913.11 N 564092.44 E 13.393 779.01 5419.15 90.490 196.640 4155.70 4222.80 79.27 S 1683.06 W 5999865.46 N 564075.81 E 12.674 829.10 ~----- .------- -- ---- ----.---- ---~- 22 July, 2002 - 14:58 Page 3 of 6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services () . Survey Report for MPS-23 MWD ~~ Your Ref: API 500292309800 Job No. AKMW22108, Surveyed: 8 July, 2002 II BP EXPLORATION (ALASKA) INC. 7ìk~Oin~:~~ Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inel. Azim. Depth Depth Northlngs Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 5462.01 89.450 194.340 4155.72 4222.82 120.57 S 1694.51 W 5999824.06 N 564064.73 E 5.889 871.12 5507.46 90.490 188.340 4155.75 4222.85 165.11 S 1703.44 W 5999779.44 N 564056.19 E 13.398 914.91 --/ 5555.74 90.980 181.340 4155.13 4222.23 213.18 S 1707.51 W 5999731.33 N 564052.54 E 14.533 959.66 5605.09 92.280 179.830 4153.72 4220.82 262.51 S 1708.01 W 5999682.00 N 564052.47 E 4.037 1003.93 5649.47 92.650 179.420 4151.81 4218.91 306.85 S 1707.72 W 5999637.67 N 564053.15 E 1.244 1043.38 5698.45 92.580 179.260 4149.58 4216.68 355.77 S 1707.16 W 5999588.75 N 564054.15 E 0.356 1086.80 5742.33 94.370 178.980 4146.92 4214.02 399.56 S 1706.49 W 5999544.97 N 564055.21 E 4.129 1125.59 5789.80 92.830 178.880 4143.94 4211.04 446.93 S 1705.60 W 5999497.61 N 564056.51 E 3.251 1167.48 5835.48 89.690 177.800 4142.93 4210.03 492.57 S 1704.28 W 5999451.98 N 564058.23 E 7.269 1207.63 5883.60 89.940 177.180 4143.09 4210.19 540.65 S 1702.17 W 5999403.93 N 564060.76 E 1.389 1249.60 5929.48 90.490 176.810 4142.92 4210.02 586.46 S 1699.77 W 5999358.13 N 564063.57 E 1 .445 1289.42 5976.87 89.940 176.660 4142.74 4209.84 633.78 S 1697.07 W 5999310.85 N 564066.69 E 1.203 1330.44 6023.18 89.880 181.290 4142.81 4209.91 680.07 S 1696.24 W 5999264.57 N 564067.92 E 9.999 1371.39 6072.67 89.690 181.450 4143.00 '4210.10 729.54 S 1697.42 W 5999215.08 N 564067.18 E 0.502 1416.09 6115.87 88.710 179.940 4143.60 4210.70 772.73 S 1697.95 W 5999171.89 N 564067.03 E 4.167 1454.89 6165.86 88.770 182.670 4144.70 4211.80 822.69 S 1699.08 W 5999121.92 N 564066.33 E 5.461 1500.00 6209.15 91.600 184.340 4144.56 4211.66 865.90 S 1701.73 W 5999078.69 N 564064.07 E 7.590 1539.76 6258.36 91.850 183.510 4143.08 4210.18 914.97 S 1705.10 W 5999029.60 N 564061.13 E 1.761 1585.09 6303.61 89.940 184.940 4142.37 4209.47 960.09 S 1708.43 W 5998984.45 N 564058.20 E 5.273 1626.87 6352.40 89.320 184.600 4142.69 4209.79 1008.71 S 1712.49 W 5998935.80 N 564054.57 E 1 .449 1672.10 '- / 6397.03 90.250 183.740 4142.86 4209.96 1053.22 S 1715.73 W 5998891.26 N 564051.72 E 2.838 1713.30 6446.91 90.620 184.390 4142.48 4209.58 1102.97 S 1719.27 W 5998841.48 N 564048.62 E 1.499 1759.31 6490.47 90.060 184.640 4142.22 4209.32 1146.39 S 1722.70 W 5998798.02 N 564045.57 E 1.408 1799.62 6538.12 89.880 185.740 4142.24 4209.34 1193.85 S 1727.01 W 5998750.53 N 564041.68 E 2.339 1843.93 6584.23 90.310 185.340 4142.17 4209.27 1239.74 S 1731.46 W 5998704.60 N 564037.63 E 1.274 1886.91 6633.86 90.060 185.400 4142.01 4209.11 1289.15 S 1736.10 W 5998655.15 N 564033.42 E 0.518 1933.11 6677.15 90.180 186.550 4141.92 4209.02 1332.21 S 1740.61 W 5998612.06 N 564029.30 E 2.671 1973.58 6724.81 91.110 181.630 4141.38 4208.48 1379.73 S 1744.01 W 5998564.51 N 564026.32 E 10.505 2017.53 6770.59 90.550 176.750 4140.72 4207.82 1425.48 S 1743.36 W 5998518.76 N 564027.37 E 10.728 2058.09 6812.62 90.250 173.500 4140.42 4207.52 1467.36 S 1739.79 W 5998476.92 N 564031.31 E 7.765 2093.86 - --------~---------- 22 July, 2002 - 14:58 Page 4 of6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services D~~ . Survey Report for MPS-23 MWD Your Ref: API 500292309800 *Wh Job No. AKMW22108, Surveyed: 8 July, 2002 BP EXPLORATION (ALASKA) INC. IV~ BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/1 OOft) 6863.97 88.220 168.150 4141.11 4208.21 1518.02 S 1731.61 W 5998426.33 N 564039.93 E 11.142 2135.41 6915.75 86.120 168.600 4143.66 4210.76 1568.68 S 1721.19 W 5998375.77 N 564050.80 E 4.147 2175.93 6957.79 85.930 169.160 4146.58 4213.68 1609.83 S 1713.10W 5998334.69 N 564059.25 E 1.404 2209.03 - 7006.45 88.150 168.290 4149.09 4216.19 1657.48 S 1703.60 W 5998287.12 N 564069.17 E 4.899 2247.29 7051.11 89.510 167.990 4150.00 4217.10 1701.18 S 1694.42 W 5998243.51 N 564078.73 E 3.118 2282.16 7099.46 89.450 168.260 4150.44 4217.54 1748.49 S 1684.47 W 5998196.29 N 564089.10 E 0.572 2319.92 7144.70 90.000 169.080 4150.66 4217.76 1792.85 S 1675.58 W 5998152.01 N 564098.38 E 2.182 2355.51 7193.97 88.830 164.530 4151.16 4218.26 1840.80 S 1664.34 W 5998104.16 N 564110.04 E 9.535 2393.26 7237.92 88.830 163.910 4152.06 4219.16 1883.09 S 1652.39 W 5998061.98 N 564122.36 E 1.410 2425.62 7286.66 86.980 162.990 4153.84 4220.94 1929.77 S 1638.52 W 5998015.42 N 564136.65 E 4.238 2461.05 7331.49 86.550 163.290 4156.37 4223.47 1972.61 S 1625.54 W 5997972.70 N 564150.00 E 1.169 2493.44 7380.49 87.600 162.020 4158.87 4225.97 2019.32 S 1610.95 W 5997926.12 N 564165.00 E 3.360 2528.57 7424.77 89.020 162.130 4160.18 4227.28 2061.43 S 1597.33 W 5997884.13 N 564178.99 E 3.216 2560.03 7473.38 89.380 162.350 4160.86 4227.96 2107.72 S 1582.50 W 5997837.97 N 564194.23 E 0.868 2594.67 7517.24 90.860 161.860 4160.76 4227.86 2149.45 S 1569.02 W 5997796.36 N 564208.07 E 3.554 2625.86 7565.51 91.170 160.010 4159.91 4227.01 2195.07 S 1553.26 W 5997750.88 N 564224.24 E 3.885 2659.48 7610.51 91.050 160.020 4159.04 4226.14 2237.35 S 1537.88 W 5997708.74 N 564239.98 E 0.268 2690.30 7660.62 90.920 159.160 4158.18 4225.28 2284.31 S 1520.41 W 5997661.94 N 564257.87 E 1.735 2724.34 7701.20 93.510 159.170 4156.61 4223.71 2322.20 S 1505.99 W 5997624.17 N 564272.62 E 6.383 2751.68 7757.78 94.000 158.590 4152.90 4220.00 2374.87 S 1485.65 W 5997571.69 N 564293.43 E 1.340 2789.53 ~. 7796.38 98.760 157.640 4148.61 4215.71 2410.45 S 1471.35 W 5997536.23 N 564308.04 E 12.572 2814.86 7835.42 98.470 157.710 4142.77 4209.87 2446.16 S 1456.69W 5997500.65 N 564323.01 E 0.764 2840.13 7890.92 100.100 157.400 4133.81 4200.91 2496.78 S 1435.78 W 5997450.21 N 564344.37 E 2.988 2875.90 7940.34 93.450 156.640 4127.99 4195.09 2541.93 S 1416.63 W 5997405.23 N 564363.92 E 13.542 2907.58 7983.33 91.720 155.870 4126.05 4193.15 2581.24 S 1399.34 W 5997366.08 N 564381.55 E 4.404 2934.88 8040.02 91.660 156.190 4124.37 4191.47 2633.02 S 1376.32 W 5997314.50 N 564405.03 E 0.574 2970.73 8110.00 91.660 156.190 4122.35 4189.45 2697.02 S 1348.08 W 5997250.76 N 564433.83 E 0.000 3015.14 Projected Survey ----~ - --- - ---- -~- ---------- ---- 22 July, 2002 - 14:58 Page 50f6 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for MPS-23 MWD Your Ref: API 500292309800 Job No. AKMW2210B, Surveyed: B July, 2002 . BP EXPLORATION (ALASKA) INC. Milne Point Unit ð~~ ~ ; BPXA Iflì~ Milne Point MPS ~ All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 206.780° (True). .- Based upon Minimum Curvature type calculations, at a Measured Depth of 8110.00ft., The Bottom Hole Displacement is 3015.17ft., in the Direction of 206.558° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 8110.00 4189.45 2697.02 S 1348.08 W Projected Survey Survey tool program for MPS-23 MWD From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) """",/ 0.00 175.00 0.00 175.00 175.00 8110.00 175.00 Tolerable Gyro 4189.45 MWD Magnetic - ----- -- ----~------ ---~---~- ---~ 22 July, 2002 - 14:58 Page 60'6 DrillQuest 2.00.08.005 ~ I:j ?!Ær;-?~;.' 'I ^ Ii! ! ¡ il' ¡ I '. . j 'U LS ) !....r0.1L wJû } IK\ n fE\ @ G1 !M W 11 Lro ~ U\1 Lru TONY KNOWLES, GOVERNOR AI,ASIiA OIL AND GAS CONSERVATION COMMISSION 333 W. PH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 July 1, 2002 Pat Archey BP Exploration (Alaska), Inc. Drilling Department PO Box 196612 Anchorage Alaska 99519 Re: Permit to Drill 202-132 Dear Mr. Archey: Last week the Commission approved the above-referenced application for permit to drill. The approval letter inadvertently included two sentences from a template generally used for exploratory wells. Please disregard the following requirement that was included in the approval letters : "A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use." We apologize for any inconvenience this may have caused you. Sincerely, (f)/h... f~'~~J.fd ~~~~chsli Taylor~- Ò~. Chair ) (~. ~ I f fK\ ~.ï1 r. [[~ rl~~.1 ~ I.@\.. Q1) u fJ-Ù, U L1':J tJ) U Ii u ) (;'7"- t \ 1_1 ',\ n1ì ~~I TONY KNOWLES, GOVERNOR .A.I~A.~KA OIL AND GAS CONSERVATION COMMISSION 333 W. PH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Milne Point Unit l\1PS-23 BP Exploration (Alaska), Inc. Permit No: 202-132 Surface Location: 3293' NSL 252' WEL, Sec. 12, T12N, R10E, UM Bottomhole Location: 584' NSL, 1619' WEL, Sec. 12, TI2N, RI0E, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above development well. The permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicaþle provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, cÞ, {kLt '¥ cam:techsli Taylor Chair BY ORDER OF THE COMMISSION DATED this~day of June, 2002 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Hole 42" 9-7/8" 6-1/8" 1 STATE OF ALASKA \ ALASKA vi AND GAS CONSERVATION COMMI,-"'.=,ION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (OF or KB) 10. Field and Pool Planned KBE :;:: 68.001 Milne Point Unit / Schrader 6. Property Designation Bluff ADL 380109 7. Unit or Property Name Milne Point Unit 8. Well Number / MPS.23 9. Approximate spud dqte 07/01/02 / Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 8068' MD 14242' TVD 17. Anticipated pressure {S~'20 AAC 25.035 (e) (2)} Maximum surface 1488 psig, At total depth (TVD) 4256' 11914 psig Setting Depth Top Bottom MD TVD MD TVD Surface Surface 1131 1131 Surface Surface 5067' 4257' 49671 42401 8068' 42421 r/)~J ~6A- ä l'f¡ 0 1- ~ I:i&£-" 1 a. Type of work II Drill 0 Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3293' NSL, 2521 WEL, SEC. 12, T12N, R10E, UM At top of productive interval 3484' NSL, 16651 WEL, SEC. 12, T12N, R10E, UM At total depth 5841 NSL, 16191 WEL, SEC. 12, T12N, R10E, UM 12. Distance to nearest property line 13. Distance to nearest well / ADL 025637,5841 MD (APPROX.) No Close Approach 16. To be completed for deviated wells .,/ Kick Off Depth 14001 MD Maximum Hole Angle 94.720 18. Casin~ Program Specifications Size Casina Weiaht Grade Couplina 20" 92# H-40 Welded 7-5/8" 29.7# L-80 BTC 4-1/2" 12.7# L-80 BTC 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 Lenath 80' 5067' 31011 Quantitv of Cement . (include staae data) 260 sx Arctic Set (Approx.) 487 sx Class 'LI, 266 sx Class IG' Uncemented Slotted Liner .,/ ./ 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical feet feet feet feet Junk (measured) Plugs (measured) Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Production Liner RECEIVED JüN 2 ~j 2002 Perforation depth: measured true vertical Alaska DB & Gas Gons. Gomnllssion Anchorage 20. Attachments II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number. Steve Campbell, 564-4401 Prepared By Name/Number: Sondra Stewman, 564-4750 21. I hereby certify that th.leAoregOij¡,is t/--; ~ . ~.ru.e. .a. n.d. .correct to.t.he b. e. ~t Of. ..m... y ~...n...ow.. .I.~..~.g. e . 0 / ": / Signed Pat Archey {J"3 iL-. 7 ~:::;:;g Engineer Date ;17/ Ci ~ Permit Number API Number ApP,f?v~ D0at . See cover lett,er .2. 0 2.. -- /...3? 50- 02. 9- 2. 3 <=' <J <g ; (:Il) (h (/?-.. for other reaUlrements Conditions of Approval: Samples Required 0 Yes ~ No Mud Log Require 0 Yes J8 No Hydrogen Sulfide Measures 0 Yes IãJ No Directional Survey Required "'iI Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: re£~gIlßp£Eedj-~ 4000 pj/. gn BY by order of Cammy Oechsli Tayt()í Commissioner the commission (JF~i(;t¡\fJ\l Approved By Form 10-401 Rev. 12-01-85 Date &'(1 (ë' h ;~- Sibt~it In4~i~licate ) IWell Name: I MPS-23 Drill and Complete Plan Summary Milne Pc )MPS-23 Well Permit I Type of Well (service / producer / injector): 1 Multi Lateral Producer "OA" & "OB" / I 19861 FNL, (32921 FSL), 2521 FEL, (50261 FWL), SEC. 12, T12N, R10E E=565,758.06 N=5,999,959.55 16321 FNL, (36461 FSL), 1535 FEL, (37441 FWL), SEC. 12, T12N,R10E E=564472.25 N=6,OOO,303.20 Z=4213' TVD 46941 FNL, (5841 FSL), 1619 FEL, (36601 FWL), SEC. 12, T12N,R1 OE E=564415.00 N=5,997,240.00 Z=44192' TVD 1794' FNL, (34841 FSL), 1665 FEL, (36131 FWL), SEC. 12, T12N,R1 OE E=564,343.17 N=6,OOO,139.59 Z=4256' TVD 46941 FNL, (5841 FSL), 1619 FEL, (36601 FWL), SEC. 12, T12N,R1 OE E=564415.00 N=5,997,240.00 Z=4192' TVD 46941 FNL, (5841 FSL), 1619 FEL, (36601 FWL), SEC. 12, T12N,R1 OE E=564415.00 N=5,997,240.00 Z=4192' TVD I AFE Number: 1 TBD I RiQ: 1 Doyon 141 /" I I Estimated Start Date: 1 July 1, 2002 I I OperatinQ days to complete: 123 // I 1 MD: 18068 1 1 TVD: 14242 1 I Max Inc: 194 1 I KOP: 114001 1 KBE: 168 I I Well DesiQn (conventional, slimhole, etc.): I Conventional Grass Roots ML Producer I I Surface Location: Target Location: TOP "OA" Target Location: BHL "OA" Well TD Target Location: TOP "OB" Target Location: BHL "OB" Well TD TOTAL DEPTH 1 Objective: I Schrader "OA" & "OB" Mud Program: 9-7/8" Surface Hole Mud Properties: Density (ppg) Funnel visc YP HTHP Spud - LSND Freshwater Mud pH API Fi Itrate LG Solids < 6.5 8.6 - 9.20/ 75 -150 25 - 60 N/A 9.0-9.5 <8 KCL-CaC03 Flow Pro pH API Filtrate LG Solids <12 6-1/8" Production Hole Mud Properties: Density (ppg) Funnel visc YP HTHP 8.6 - 9.20 / 40 55 22 - 27 <10 8.0 - 8.5 4 - 6 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation / Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU IR. 1 ) Milne Pc )MPS-23 Well Permit Cement Program: Casing Size 17 5/8" 29.7 lblft L-80 BTC Surface casing Basis 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below permafrost Total Cement Volume: Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg Spacer 50 bbl of Viscosified Spacer (Alpha Design) weighted to 1 0.5~pg Lead 487 sxs 10.7 lb/gal Class L - 4.15 cuft/sx (cement to surface) / Tail 266 sxs 15.8 Prem G - 1.15 cuft/sx of tail at 4046' -- Temp BHST ~ 80° F from SOR, BHCT 85° F estimated by Halliburton Evaluation Program: 9 7/8" Hole Section: Open Hole: Cased Hole: 6-1/8" Hole section: Open Hole: MWDJGRlRES IFR/CASANDRA N/a MWD/GRlRES ABI/IFR/CASANDRA Formation Markers: Formation Tops M D kb (ft) TVDrkb Pore Pressure Estimated EMW r (ft) * (Psi) (ppg) Base Permafrost 1767 1767 794 8.65 SVl N/A Top Ugnu 4450 4027 1811 8.65 Top Ugnu M N/A NA 4546 4090 1839 8.65 /' NB 4590 4112 1854 8.65 NC 4645 4138 1861 8.65 NE 4673 4150 1866 8.65 NF 4767 4187 1883 8.65 Top OA 4848 4213 1895 8.65 Base OA 4936 4235 1904 8.65 Top OB 5061 4256 1914 8.65 TD 8068 4242 1908 8.65 2 ) . Based on SSrrVD depths CasinglTubing Program: Hole Size Csg / WtlFt Grade Conn Length Tbg O.D. 42" 20" * 92# 97/8" 7 5/8" 29.7# 6-1/8" 4-1/2" 12.7# 6-1/8" 4-1/2" 12.7# *The 20" casing is insulated H -40 Welded L-80 BTC L-80 BTC L-, BTC 80' 5067 ' 3101 ' 3245' Recommended Bit Pro~ram: BHA Hole Depth (MD) Bit Type Size 97/8" 0' - 5067' 6 1/8" 5067' - 8065' 6 1/8" 4827 - 8072' 1 2 3 Smith "Twist" PDC PDC Well Contro~ . p~ hole will be drilled with a diverter. / Surface Interval . Maximum anticipated BHP: . Maximum surface pressure: . Planned BOP test pressure: . . Kick tolerance: . Planned completion fluid: Milne Pi ') MPS-23 Well Permit Top MD / TVDrkb 0' 0' 4967' /4240 4827' /4207 Bottom MD / TVDrkb 113' /113' 5067' / 4257' ./ 8068' /4242 8072' /4192 Nozzle/Flow rate 3-13 & 1-10 1914 psi @ 4256' TV~kb - Top of "OB" 1488 psi @ su rface (Based on BHP and a full column of gas from TD @ 0.1 psi/ft) Diverter will be function tested. BOP's:Test annular 250 psi low and 2500 psi high, and rams to 250 psi low and 4,000 psi high. N/A 9.2 ppg NaC1/6.8 ppg Diesel Drilling Hazards & Contingencies: Hydrates / . Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for 3 " Milne Pf') MPS-23 Well Permit the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. . Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation . We do not expect losses while drilling this well. . Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures . It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the SchraderSluff formation will be drilled with 9.1 ppg mud. Pad Data Sheet . Please Read the S-Pad Data Sheet thoroughly. Breathing . N/A Hydrocarbons . Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults . NA Hydrogen Sulfide , . MPS Pad is not designated as an H2S Pad. / Anti-collision Issues . MPS-23 has no anti-collision issues. 4 ) DRILL & COMPLETION PROCEDURE Milne p( ') MPS-23 Well Permit Pre- Rig Operations 1. The 20" insulated conductor is installed Procedure / 1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe 2. Drill 9-7/8" surface hole as per directional plan. Maximum angle 840 3. Condition mud prior to 7 5/8" casing run. POOH ./ 4. Run and cement 7 5/8" casing from TD to surface. 5. ND Di verter 6. Install FMC 11" 5m horizontal wellhead 7. N/U and test 13 ~8" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250 low and 4000 psi high /' 8. Drill 6-1/8" OB horizontal production hole as per directional pla~", 9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing. /' 10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD. a. RIH. Orient and set whipstock to place window ßt top of the OA interval. b. Shear off and mill window thru 7-5/8" casing. / 11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud properties and POOH. 12. MU whipstock retrieving tool and pull whipstock / 13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing 14. POOH 15. TIH and displace out drilling mud with 9.2 ppg NaCL 16. POOH 17. Run in hole with 4-1/2" jet pump completion as per schematic 18. Land tubing hanger and test 19. Set BPV 20. ND BOP 21. Install and test tree 22. Pull BPV 23. Drop ball and set production packer j' 24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi 25. Freeze protect thru GLM 26. Install BPV and secure the well 27. RD/MO 5 Field: Milne Point Well: S-23 ML DIRECTIONAL LWD OPEN HOLE LOGGING NONE NONE Dir/GR/RES NONE ) ') BP EXPLORATION Milne Point Unit 8-23 & 823 L 1 RDID IPALAlD IRILUNSa WEUS ENG: Steve Campbell RIG: Doyon 141 MSL 35' RKB: 68' Actual Surface Location: 3292' FSL & 252' FEL FORMATION DEPTH MD I TVD TOC HOLE CASING MUD INFO TOC SIZE SPECS PIT INFO INFORMATION Wellhead H-40 FMC Gen 6 20" x 11" 5M InsulatedWelde N/A 42" d KOP @ 300 MD EOB @ 5067' MD ,. - - Õi~/Re; . - - . - - - - - - - - - - - - - - - - - - - - - - - - - . - -. , ABI/GR NONE OA sand 4,838' 4,213' " ... - - - - - - . - - - - - - - - - - - - - - - - - - - - - .!,~~2~ ~:.1~'. - ... .... - 113' 113' Top of Lead Cement Surf Surf Base of Permafrost 1,933' 1.822' Top of Tail Cement 4,046 Top or N sand 4,546' 4,090' 7-5/8" Surface casing 5,067' 4,257' --Õi~/Re;. - ---- ----- - - --- -- - --- -- -- ------ ABI/GR NONE OB sand 5,061' 4,256' 8,068' 4,242' -- -- --. - ----- - --- -- - - ----- --,-- --- - -. ------. 6/18/2002 6-1/8" Hole - 4-1/2",12.6#, L-80 Slotted Liner I 9-7/8" Surface Casing 75/8" 29.73:8# L-80 BTC MW = 9.2 6-1/8" Hole - 4-1/2", 12.6#, L-80 Slotted Liner / MPS-23ML WBD.xls .. TREE: 'Cameron 4-1/16" 5M i-JHOi-JOSI::LJ c.;OMi-JLI:: liON WELLHEAD: FMCGen6 11",5M r"'\D ~-?~ .... ~-?~ L 1 Tubing Head: 11" x 4-112", ~ I ~ FMC Tubing Hanger ~! 112' 20" 92 Ibltt, H-40 Welded ~ ': Insulated Diesel Freeze protect to 750' MD 9.2 KCL with corrosion inhibitor as packer fluid Jet Pump Installed in Sliding Sleeve Post rig! III ~ I Y: L . ~, 7-5/8" 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing ID: 6.875 Coupling 00: 8.5" Burst: 6,890 psi Collapse: 4,790 psi - Window in 7" casing @ 4827' MD Well Inclination @ Window = 70 deg ) KB. ELEV =67.3' Cellar Box ELEV = 39.1' ... 42" Hole 4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD ,2000' TVD, RP shear valve open position 4-1/211, 12.6Ib/ft, L-80, IBT-M Coupling 00: 5.2" OrifUIO: 3.833" Burst: 8,430, 80% 6,744 psi Collapse: 7,500, 80%=6,000 psi ~ "" . BIW 1- Wire Phoenix Pressure Gauge (3.850" 10, W/BIW 1- wire down to lower sensor) Halliburtion Dura Sleeve XD WIX Nipple (3.813" 10) Phoenix Pressure Gauge (2.840" 10) 7-5/8" x 4-1/2" S-3 Packer ISet @ 4,767'MD, 4187' TVDI 3-1/2" HES'XN' nipple 2.750" 10 No Go W/RHC ball & rod Wireline Entry Guide Multi-Lateral Junction 4,827' \~ 6-1/8" OA Lateral TO 8,072' /' 6-1/8" OB Lateral TO 8,068' ....... --- - - - - - - - OA Horizontal 6-1/8" hole r-- -- - - - - - - - - 4-1/2" Slotted Liner W/Hookwall hanger , / ~ ~ ~~ ,~9-7/8"Hole ¡ ~~ " \ ... . ------- " "-- 08 Horizontal 6-1/8" hole .....-- -- ---- 7" Casing Shoe @ 5067' MD Well Inclination @ Shoe = 77 Degrees PBTD TD DATE 05/01/02 REV. BY SKC COMMENTS Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion 4-1/2" Slotted Liner & Hanger Milne Point Unit WFI I : 8-?3 API NO: ¡::¡ D ~'O(>I~ '~ bp 0 ~ 2: Ë E. 2 100 Ö ] 't: > 2 f- COMPANY DETAII.5 ß P Amoco REFERENCE INFORMA llON C<><>rdioale (N/E) Reference: Wen CerImo: Plan MPS.23. True Nooh Verucal (TVD) Rerereooe: S-Pad Dev 72.00 Section (VS) Rererence: SIoI- (O.ooN.O.ooE) M...~~~= ~~~a.va~OO SURVEY PROGRAM Deplh Fm Depth To SurYeyIPlan 72.00 800.00 PIamed: MPS-23 WrJ11 VI 800.00 806850 PIamed: MPS-23 W¡fJ7 VI Dale: Dale: Celculalion Melhod: Miniman am,.." ~ ~:= ~~~~r>Ier Nonh Error Surre..: Elliptical + ûsing WaminR Mclhod: Rules ß8ICd 700 1/100': 1300' MD, 1300'TVD Dir 1.5/100': 1400' MD, 1399.99'TVD 1400 : 1700.57' MD, \700' TVD : 2734.\' MD, 2679.87' TVD 2800 3500 4200 -700 700 þV' irf~:' .I .I ~# ~ #' # ?Ø".~.... 'J!~~'" . ,~ . ". "'~ ~ -"', " .,,' ", Plan: MPS-23 Wrm (plan MPS-231P1an MPS-23) Tool Created By: Ken AJJœ Checked: Date: 3/28/2002 CÐ-GYRO-SS MWD+IFR+MS Reviewed: WELL DETAILS Name +NI-S +FJ-W Nor1hing Easting Latitude Longitude 810< Plan MPS-23 -13.24 -587.14 5999959.55 565758.06 1()024'J7.198N 149"27'S2380W NlA TARGET DETAILS Name 1VD +NI-S +F.J-W Nor1hing Easting Shape MPS-23 T6 4242.00 -2701.88 -1367.08 5997240.00 564415.00 Poinl MPS-23 T3 4247.00 -127427 -1754.51 5998610.00 564015.00 Point MPS-23 T2 4252.00 -315.59 -159\.05 5999630.00 564170.00 Poinl MPS-23 T5 4257.00 -2276.58 -150830 5997670.00 564270.00 Point MPS-23 TIb 4257.00 187.95 -1416.59 6000135.00 564340.00 Point MPS-23 T 4 4269.00 -2116.04 -1566.90 5997830.00 564210,00 Poinl SECITON DErAILS See MD Ine Azi TVD +N/-S +FJ-W DLeg TFaee VSec Target 1 72.00 0.00 0.00 72.00 0.00 0.00 0.00 0.00 0.00 2 1300.00 0.00 0.00 1300.00 0.00 0.00 0.00 0.00 0.00 3 1400.00 1.00 320.79 1399.99 0.68 -0.55 1.00 320.79 -0.35 4 1700.57 5.51 320.79 1700.00 13.89 -11.34 1.50 0.00 -7.29 5 2001.96 5.51 320.79 2000.00 36.31 -29.62 0.00 0.00 -19.06 6 2734.10 34.79 320.79 2679.87 229.63 -187.33 4.00 0.00 -120.56 ~ 7 3501.55 34.79 320.79 3310.10 568.97 -464.16 0.00 0.00 -298.72 8 5067.12 84.00 2\5.00 4257.00 187.95 =:1ö~:¡; or1~:gg -106.41 470.65 MPS-23 Tlb 9 5280.03 92.17 195.31 4264.18 -3.59 -68.01 682.13 10 5564.96 92.17 195.31 4253.40 -278.20 -1581.62 0.00 0.00 961.15 II 5603.53 92.00 193.00 4252.00 -315.59 -1591.05 6.00 -94.13 998.77 MPS-23 T2 12 5632.10 90.49 192.19 4251.38 -343.45 -1597.28 6.00 -151.64 1026.45 13 6291.96 90.49 192.19 4245.72 -988.42 -1736.56 0.00 0.00 1664.98 14 6579.46 89.00 175.00 4247.00 -1274.27 -1754.51 6.00 -94.96 1928.25 MPS-23 T3 15 6703.84 88.15 167.58 4250.10 -1397.09 -1735.70 6.00 -96.62 2029.41 16 7295.38 88.15 167.58 4269.19 -1974.50 -1608.58 0.00 0.00 2487.56 17 7443.08 92.00 159.60 4269.00 -2116.04 -1566.90 -1:gg -64.29 2595.13 MPS-23 T4 18 7488.37 94.72 159.60 4266.35 -2158.41 -1551.14 -0.07 2625.85 19 7561.55 94.72 159.60 4260.33 -2226.77 -1525.71 0.00 0.00 2675.41 20 7614.42 92.50 161.87 4257.00 -2276.58 -1508.30 6.00 134.27 2712.03 MPS-23 T5 21 7624.65 91.89 161.87 4256.61 -2286.29 -1505.12 6.00 180.00 2719.27 22 8068.50 91.89 161.87 4242.00 -2707.88 -1367.08 0.00 0.00 3033.40 MPS-23 T6 CASING DErAILS No. TVD MD Name Size 1 4257.00 5067.12 75/8" 7.625 2 4242.00 8068.50 4 112" 4.500 FORMATION TOP DErAILS No. TVDPath MDPath Formation 1 4090.50 4546.91 NA 2 4112.50 4590.52 NB 3 4138.20 4645.26 NC_D / 4 4150.40 4673.04 NE - 5 4187.40 4767.27 NF 6 4213.60 4848.30 OA 7 4235.90 4936.12 TSBC 8 4256.40 5061.51 OB All TVD depths are ssTVD plus 72'for RKBE. 1400 I 3500 I 4200 I 4900 Start Dir 10/100': 5067.12' MD, 4257'TVD End Dir : 5280.03' MD, 4264.\8' TVD Start Dir 6/100' : 5564.96' MD, 4253.4'TVD Start Dir 6/100' : 7295.38' MD,4269.19'TVD End Dir : 7488.37' MD, 4266.35' TVD Start Dir 6/100' : 7561.55' MD, 4260.33'TVD . fJJLEnd Dir : 7624.65' MD, 4256.61' TVD . . . - - . -' i]:f=~:,¿I£JJ~~Lj;~1 ISmtDï~6/lqO'-:. 529~.96'MD;4245.72~ - - ¡¡ i ; i j Iii i i 2\00 2800 Vertical Section at 206.79° [700ft/in] bp f.'...~.. if~' c 2: 0 0 ~ +' "E t: ~ i: -1200 :; 0 CIJ Start Dir 4/100' : 2001.96' MD, 2000'TVD '.'fjnd Dir : 1700.57' MD, 1700' TVD , Qtart Dir 1.5/100': 1400' MD, 1399.99'TVD pOO ¡ Start Dir 11100': 1300' MD, 1300'TVD COMrANY DETAILS OP Amoco REFERENCE INFORMATION Co-ordinale (N/E) Relen:oœ: Wen Ceooe: !'Ian MJ>S.23, True N<1r1h Verûc81 (IVD) Rerereoœ: S-Pad Dev 72.00 Section (VS) Rerereoce: SIot- (O.OON,O.OOE) M~.~':= ~~a.v.~00 Calçulaljon M<lhod: Mininun CUrvaore ~ ~=:: !(';vW¿¡- Nor\I1 Error Surr"",,: Elliplical + Casing WamiJ1K Method: Rules Oall<d 600 ! Start Dir 6/1 00' : 3501.55' MD, 3310.1 'TVD .; 7SI8't~~:o,!;r-:;t~f:l~:~:S71 l';;.~;'hlro' ~SMt+, H4Tro . End Dir : i563:!.I' MD, ~251~38' tVD .. ~nd Dir : 2734.1' MD, 2679.87' TVD -600 .. ..., . . . . St~rt Dlr 6/ioo' : 62Ç 1.96 Mq, 42~5.7?'Tvþ -1800 ~ MPS-23 T3 . . . . í" D;, ,6J03~4' MD,t"il'lD ! . . - . . . . . SHit! Dir6l1 00:n95:3~'Mp:4269:i 9TID. .MPS~23 T4 '", . End Dir';7A88j 7' t.1D,4f{j6;~5'~VD . : start Dir 611 ~O':: 75' 'D, 4~60:3J,!\([) n MPS-23"['5 ' .. ! .: . . ......; End: Dir : 7624.6 " 4~56A I' T vD : -2400 MPS"23T6 : . . MPS-ÜW¡}û7.' - 3000 -1800 -1200 -600 West(-)/East(+) [600ft/in] SURVEY rROGRAM Depth Fm Depth To SmoeylPlan 72.00 800.00 I'Janœd: MJ>S.23 wrm VI 800.00 8068.so rlanœd: MJ>S-23 wrm VI Plan: MPS-23 WrfJ7 (plan MPS-231P1an MPS.23) Tool Created By: Ken Allen Checked: Date: 312812002 Date: Cß.GYRO-SS MWD+IFR+MS Reviewed: Date: WEILDETAILS Name +NIoS +fJ-W Nor1Iûog Easting Lat- Loogitude Slot !'Ian MPS-23 .13.24 -587.14 5999959.55 565758.06 70"24'37.198N 149"27'S2380W NlA TARGET DETAILS Name TVD +NIoS +fJ-W Northing Easting Shape MI'S.23 T6 4242.00 .2707.88 -1367.08 5997240.00 564415.00 Point MPS-23T3 4247.00 -1274.27 .1754.51 5998670.00 564015.00 roint MPS-23 T2 4252.00 -315.59 -1591.05 5999630.00 564170.00 Point MPS-23 TS 4257.00 .2276.58 -150830 5997670.00 564270,00 roint MI'S-23 Tlb 4257.00 187.95 .1416.59 6000135.00 564340.00 Point MI'S-23 T 4 4269.00 -2116.04 .1566.90 5997830.00 564210.00 Point SECTION DETAILS See MD Jne Azi TVD +N/-S +FJ-W DLeg TFaee VSee Target 1 72.00 0.00 0.00 72.00 0.00 0.00 0.00 0.00 0.00 2 1300.00 0.00 0.00 1300.00 0.00 0.00 0.00 0.00 0.00 3 1400.00 1.00 320.79 1399.99 0.68 -0.55 1.00 320.79 -0.35 4 1700.57 5.51 320.79 1700.00 13.89 -11.34 1.50 0.00 -7.29 5 2001.96 5.51 320.79 2000.00 36.31 -29.62 0.00 0.00 -19.06 6 2734.10 34.79 320.79 2679.87 229.63 -187.33 4.00 0.00 -120.56 ,~ 7 3501.55 34.79 320.79 3310.10 568.97 -464.16 0.00 0.00 -298.72 8 5067.12 84.00 215.00 4257.00 187.95 -1416.59 6.00 -106.41 470.65 MPS-23 Tlb 9 5280.03 92.17 195.31 4264.18 -3.59 -1506.45 10.00 -68.01 682.13 10 5564.96 92.17 195.31 4253.40 -278.20 -1581.62 0.00 0.00 961.15 11 5603.53 92.00 193.00 4252.00 -315.59 -1591.05 6.00 -94.13 998.77 MPS-23 T2 12 5632.10 90.49 192.19 4251.38 -343.45 -1597.28 6.00 -151.64 1026.45 13 6291.96 90.49 192.19 4245.72 -988.42 -1736.56 0.00 0.00 1664.98 14 6579.46 89.00 175.00 4247.00 -1274.27 -1754.51 6.00 -94.96 1928.25 MPS-23 T3 15 6703.84 88.15 167.58 4250.10 -1397.09 -1735.70 6.00 -96.62 2029.41 16 7295.38 88.15 167.58 4269.19 -1974.50 -1608.58 0.00 0.00 2487.56 17 7443.08 92.00 159.60 4269.00 -2116.04 -1566.90 6.00 -64.29 2595.13 MPS-23 T4 18 7488.37 94.72 159.60 4266.35 -2158.41 -1551.14 6.00 -0.07 2625.85 19 7561.55 94.72 159.60 4260.33 -2226.77 -1525.71 0.00 0.00 2675.41 20 7614.42 92.50 161.87 4257.00 -2276.58 -1508.30 6.00 134.27 2712.û3 MPS-23 T5 21 7624.65 91.89 161.87 4256.61 -2286.29 -1505.12 6.00 180.00 2719.27 22 8068.50 91.89 161.87 4242.00 -2707.88 -1367.08. 0.00 0.00 3033.40 MPS-23 T6 FORMATION TOP DETAILS No. TVDPath MDPath Formation yf" ,'..' : : ~..._; ~~ : - : Õ ~... "'~ : Ii :r~I~~jt~~t~~~ ;11. ...' :..' ,/ ..'..........' ........ ... ..' . ..tYJJ.:,. '. ~r ~n~~~'~ ~i~;' ~, 1# i'" , :- #' 1 4090.50 4546.91 NA 2 4112.50 4590.52 NB 3 4138.20 4645.26 NC_D 4 4150.40 4673.04 NE 5 4187.40 4767.27 NF 6 4213.60 4848.30 OA 7 4235.90 4936.12 TSBC 8 4256.40 5061.51 OB CASING DETAILS -- No. TVD MD Name Size 4257.00 5067.12 75/8" 7.625 4242.00 8068.50 4 1/2" 4.500 All TVD depths are ssTVD plus 72'for RKBE. .....'/~~ ~~ v~ /' , , 4" I ~o I 1WO ) BP My Planning Report Company: BP Amoco Field: Milne Point Site: M Pt S Pad Well: Plan MPS-23 Well path: Plan MPS.23 ') Date: 3/28/2002 Time: 16:13:43 Page: Co-ordinate(NE) Reference: Well: Plan MPS-23, True North Vertical (TVD) Reference: S-Pad Dev 72.0 Section (VS) Reference: Well (0.00N,0.00E,206.79Azi) Survey Calculation Method: Minimum Curvature Db: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Field: Map Zone: Coordinate System: Geomagnetic Model: Site: M pt S Pad Site Position: From: Map Position Uncertainty: Ground Level: Northing: 5999978.00 ft Easting: 566345.00 ft Latitude: Longitude: North Reference: Grid Convergence: 0.00 ft 0.00 ft Well: Plan MPS-23 Slot Name: +N/-S -13.24 ft Northing: 5999959.55 ft +E/-W -587.14 ft Easting: 565758.06 ft Position Uncertainty: 0.00 ft Well Position: Latitude: Longitude: Wellpath: Plan MPS-23 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 6/29/2001 57460 nT Depth From (TVD) ft 0.00 +N/-S ft 0.00 Height 72.00 ft Plan: MPS-23 Wp07 Date Composed: Version: Tied-to: Principal: Yes Casing Points Oracle Alaska, Zone 4 Well Centre BGGM2001 70 24 37.329 N 149 27 35.171 W True 0.51 deg 70 24 37.198 N 149 27 52.380 W Well Ref. Point 0.00 ft Mean Sea Level 26.28 deg 80.78 deg Direction deg 206.79 3/27/2002 1 From: Definitive Path .. TV!>. .. D.iamëter . HOI..e.' ..nS... i.ze ft . ..... in.. . 5067.12 4257.00 7.625 8068.49 4242.00 4.500 75/8" 4 1/2" 9.875 6.750 Plan Section Information ...MD, InCl.. .. Azim TVD +N/~S .+E/~W OLS.. Build Turn. ..TFO, .. 'fai"get ft deg . '(jeg ft ft . ft: . deg/1QOftdeg/199ft deg/10Oft .dég. . . 72.00 0.00 0.00 72.00 0.00 0.00 0.00 0.00 0.00 0.00 1300.00 0.00 0.00 1300.00 0.00 0.00 0.00 0.00 0.00 0.00 1400.00 1.00 320.79 1399.99 0.68 -0.55 1.00 1.00 0.00 320.79 1700.57 5.51 320.79 1700.00 13.89 -11.34 1.50 1.50 0.00 0.00 2001.96 5.51 320.79 2000.00 36.31 -29.62 0.00 0.00 0.00 0.00 2734.10 34.79 320.79 2679.87 229.63 -187.33 4.00 4.00 0.00 0.00 3501.55 34.79 320.79 3310.10 568.97 -464.16 0.00 0.00 0.00 0.00 5067.12 84.00 215.00 4257.00 187.95 -1416.59 6.00 3.14 -6.76 -106.41 MPS-23 T1 b 5280.03 92.17 195.31 4264.18 -3.59 -1506.45 10.00 3.84 -9.25 -68.01 5564.96 92.17 195.31 4253.40 -278.20 -1581.62 0.00 0.00 0.00 0.00 5603.53 92.00 193.00 4252.00 -315.59 -1591.05 6.00 -0.44 -5.99 -94.13 MPS-23 T2 5632.10 90.49 192.19 4251.38 -343.45 -1597.28 6.00 -5.28 -2.85 -151.64 6291.96 90.49 192.19 4245.72 -988.42 -1736.56 0.00 0.00 0.00 0.00 6579.46 89.00 175.00 4247.00 -1274.27 -1754.51 6.00 -0.52 -5.98 -94.96 MPS-23 T3 6703.84 88.15 167.58 4250.10 -1397.09 -1735.70 6.00 -0.68 -5.96 -96.62 7295.38 88.15 167.58 4269.19 -1974.50 -1608.58 0.00 0.00 0.00 0.00 7443.08 92.00 159.60 4269.00 -2116.04 -1566.90 6.00 2.61 -5.41 -64.29 MPS-23 T4 7488.37 94.72 159.60 4266.35 -2158.41 -1551.14 6.00 6.00 -0.01 -0.07 7561.55 94.72 159.60 4260.33 -2226.77 -1525.71 0.00 0.00 0.00 0.00 7614.42 92.50 161.87 4257.00 -2276.58 -1508.30 6.00 -4.19 4.30 134.27 MPS-23 T5 7624.65 91.89 161.87 4256.61 -2286.29 -1505.12 6.00 -6.00 0.00 -180.00 8068.50 91.89 161.87 4242.00 -2707.88 -1367.08 ~ 0.00 0.00 0.00 0.00 MPS-23 T6 ) BP My Planning Report ') .',: .,cF:' :.¡.o...cin...I...'..d'. P..:.... ~n.... .y; J3PA(Öþco . .' Milnepólnt S.te ... M;Pt$~Ød .. ::...~:.:..,..'....,..,'..,ee....:...II,:....~,.....'..p:.:!.'.a:. ...t:....h'...' plånMP$+23 . .n RlanMp$;.23 Date: 3/28/2002 Time: 16:13:43 Page: Co-ordinate(NE) Reference: Well: Plan MPS-23, True North Vertical (fVD) Reference: S-Pad Dev 72.0 Section (VS) Reference: Well (0.00N,0.00E,206.79Azi) Survey Calculation Method: Minimum Curvature Db: Oracle 2 Targets MPS-23 T6 4242.00 -2707.88 -1367.08 5997240.00 564415.00 70 24 10.565 N 149 28 32.435 W MPS-23 T3 4247.00 -1274.27 -1754.51 5998670.00 564015.00 70 24 24.664 N 149 28 43.797 W MPS-23 T2 4252.00 -315.59 -1591.05 5999630.00 564170.00 70 24 34.093 N 149 28 39.013 W MPS-23 T5 4257.00 -2276.58 -1508.30 5997670.00 564270.00 70 24 14.807 N 149 28 36.576 W MPS-23 T1 b 4257.00 187.95 -1416.59 6000135.00 564340.00 70 24 39.045 N 149 28 33.902 W MPS-23 T 4 4269.00 -2116.04 -1566.90 5997830.00 564210.00 70 24 16.386 N 149 28 38.294 W Formations ,TVl).. .. Fóhriationš ; .. þ~p!~~gl~ : ;pip»~r,~ti()n .. ft ...: ;¡}:I,%1.::' ,d~. 4546.91 4090.50 NA 0.00 0.00 4590.52 4112.50 NB 0.00 0.00 4645.26 4138.20 NC_D 0.00 0.00 4673.04 4150.40 NE 0.00 0.00 4767.27 4187.40 NF 0.00 0.00 4848.30 4213.60 OA 0.00 0.00 4936.12 4235.90 TSBC 0.00 0.00 5061.51 4256.40 OB 0.00 0.00 Survey ...Iricl.. ..Azim.....:. . TyJj. .sÿs]'yp , .l\1;~pN .. 'VS. 01$< . .. Tòôl/CÓmmeôt , .¡j7g .deg . Jt . ft .. .... fL ft ~eg/~9~:: . ... 72.00 0.00 0.00 72.00 0.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS 100.00 0.00 0.00 100.00 28.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS 200.00 0.00 0.00 200.00 128.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS 300.00 0.00 0.00 300.00 228.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS 400.00 0.00 0.00 400.00 328.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS 500.00 0.00 0.00 500.00 428.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS 600.00 0.00 0.00 600.00 528.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS 700.00 0.00 0.00 700.00 628.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS 800.00 0.00 0.00 800.00 728.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS 900.00 0.00 0.00 900.00 828.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS 1000.00 0.00 0.00 1000.00 928.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS 1100.00 0.00 0.00 1100.00 1028.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS 1200.00 0.00 0.00 1200.00 1128.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS 1300.00 0:00 0.00 1300.00 1228.00 5999959.55 565758.06 0.00 0.00 Start Dir 1/100' : 1300' MD, 1 1400.00 1.00 320.79 1399.99 1327.99 5999960.22 565757.50 -0.35 1.00 Start Dir 1.5/100' : 1400' MD, 1500.00 2.50 320.79 1499.95 1427.95 5999962.57 565755.55 -1.60 1.50 MWD+IFR+MS 1600.00 4.00 320.79 1599.78 1527.78 5999966.93 565751.93 -3.90 1.50 MWD+IFR+MS 1700.57 5.51 320.79 1700.00 1628.00 5999973.34 565746.60 -7.29 1.50 End Dir : 1700.57' MD, 1700' 1800.00 5.51 320.79 1798.97 1726.97 5999980.68 565740.51 -11.18 0.00 MWD+IFR+MS 1900.00 5.51 320.79 1898.51 1826.51 5999988.07 565734.37 -15.08 0.00 MWD+IFR+MS 2001.96 5.51 320.79 2000.00 1928:00 5999995.59 565728.12 -19.06 0.00 Start Dir 4/100' : 2001.96' MD 2100.00 9.43 320.79 2097.19 2025.19 6000005.40 565719.98 -24.25 4.00 MWD+IFR+MS 2200.00 13.43 320.79 2195.19 2123.19 6000020.64 565707.32 -32.31 4.00 MWD+IFR+MS 2300.00 17.43 320.79 2291.56 2219.56 6000041.10 565690.33 -43.13 4.00 MWD+IFR+MS 2400.00 21.43 320.79 2385.85 2313.85 6000066.68 565669.08 -56.66 4.00 MWD+IFR+MS 2500.00 25.43 320.79 2477.58 2405.58 6000097.26 565643.68 -72.83 4.00 MWD+IFR+MS 2600.00 29.43 320.79 2566.32 2494.32 6000132.59 565614.25 -91.57 4.00 MWD+IFR+MS 2700.00 33.43 320.79 2651.63 2579.63 6000172.l9 565580.95 -112.78 4.00 MWD+IFR+MS ) BP ) My Planning Report Company: BP Amoco Date: 3/28/2002 Time: 16:13:43 Page: 3 Field: Milne Point Co-ordinate(NE) Reference: Well: Plan MPS-23, True North Site: M Pt S Pad Vertical ([VD) Reference: S-Pad Dev 72.0 Well: Plan MPS-23 Section (VS) Reference: Well (0.00N,O.00E,206.79Azi) Well path: Plan MPS-23 Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys TVD MapN MapE VS DLS TooVComment ft deg deg ft ft ft . ft ft deg/1 000 2734.10 34.79 320.79 2679.87 2607.87 6000187.50 565568.73 -120.56 4.00 End Dir : 2734.1' MD, 2679.87 2800.00 34.79 320.79 2733.98 2661.98 6000216.42 565544.71 -135.86 0.00 MWD+IFR+MS 2900.00 34.79 320.79 2816.10 2744.10 6000260.32 565508.25 -159.07 0.00 MWD+IFR+MS 3000.00 34.79 320.79 2898.23 2826.23 6000304.21 565471.79 -182.29 0.00 MWD+IFR+MS 3100.00 34.79 320.79 2980.35 2908.35 6000348.10 565435.34 -205.50 0.00 MWD+IFR+MS 3200.00 34.79 320.79 3062.47 2990.47 6000391.99 565398.88 -228.72 0.00 MWD+IFR+MS 3300.00 34.79 320.79 3144.59 3072.59 6000435.89 565362.43 -251.93 0.00 MWD+IFR+MS 3400.00 34.79 320.79 3226.71 3154.71 6000479.78 565325.97 -275.14 0.00 MWD+IFR+MS 3501.55 34.79 320.79 3310.10 3238.10 6000524.35 565288.95 -298.72 0.00 Start Dir 6/100' : 3501.55' MD 3550.00 34.07 315.81 3350.07 3278.07 6000544.64 565270.57 -308.77 6.00 MWD+IFR+MS 3600.00 33.55 310.50 3391.62 3319.62 6000563.47 565250.13 -316.61 6.00 MWD+IFR+MS 3650.00 33.25 305.08 3433.38 3361.38 6000580.14 565228.26 -321.87 6.00 MWD+IFR+MS 3700.00 33.20 299.60 3475.21 3403.21 6000594.57 565205.01 -324.51 6.00 MWD+IFR+MS 3750.00 33.38 294.14 3517.02 3445.02 6000606.74 565180.45 -324.55 6.00 MWD+IFR+MS 3800.00 33.80 288.77 3558.68 3486.68 6000616.62 565154.64 -321.98 6.00 MWD+IFR+MS 3850.00 34.44 283.55 3600.08 3528.08 6000624.17 565127.65 -316.80 6.00 MWD+IFR+MS 3900.00 35.30 278.52 3641.11 3569.11 6000629.38 565099.57 -309.03 6.00 MWD+IFR+MS 3950.00 36.36 273.72 3681.65 3609.65 6000632.23 565070.46 -298.69 6.00 MWD+IFR+MS 4000.00 37.60 269.18 3721.60 3649.60 6000632.71 565040.40 -285.82 6.00 MWD+IFR+MS 4050.00 39.01 264.91 3760.84 3688.84 6000630.82 565009.49 -270.43 6.00 MWD+IFR+MS 4100.00 40.56 260.89 3799.27 3727.27 6000626.57 564977.80 -252.59 6.00 MWD+IFR+MS 4150.00 42.24 257.13 3836.78 3764.78 6000619.97 564945.41 -232.33 6.00 MWD+IFR+MS 4200.00 44.04 253.62 3873.27 3801.27 6000611.03 564912.43 -209.71 6.00 MWD+IFR+MS 4250.00 45.94 250.33 3908.63 3836.63 6000599.79 564878.93 -184.79 6.00 MWD+IFR+MS 4300.00 47.92 247.25 3942.78 3870.78 6000586.27 564845.02 -157.65 6.00 MWD+IFR+MS 4350.00 49.98 244.36 3975.62 3903.62 6000570.50 564810.77 -128.35 6.00 MWD+IFR+MS 4400.00 52.12 241.65 4007.05 3935.05 6000552.54 564776.30 -96.98 6.00 MWD+IFR+MS 4450.00 54.30 239.09 4037.00 3965.00 6000532.44 564741.69 -63.62 6.00 MWD+IFR+MS 4500.00 56.55 236.66 4065.37 3993.37 6000510.23 564707.03 -28.36 6.00 MWD+IFR+MS 4546.91 58.69 234.50 4090.50 4018.50 6000487.55 564674.56 6.36 6.00 NA 4550.00 58.83 234.36 4092.10 4020.10 6000486.00 564672.43 8.69 6.00 MWD+IFR+MS 4590.52 60.71 232.58 4112.50 4040.50 6000464.91 564644.49 39.97 6.00 NB 4600.00 61.16 232.17 4117.11 4045.11 6000459.80 564637.97 47.45 6.00 MWD+IFR+MS 4645.26 63.29 230.27 4138.20 4066.20 6000434.44 564606.99 83.90 6.00 NC_D 4650.00 63.51 230.08 4140.32 4068.32 6000431.70 564603.76 87.79 6.00 MWD+IFR+MS 4673.04 64.61 229.14 4150.40 4078.40 6000418.14 564588.10 106.89 6.00 NE 4700.00 65.90 228.07 4161.68 4089.68 6000401.79 564569.87 129.62 6.00 MWD+IFR+MS 4750.00 68.31 226.13 4181.14 4109.14 6000370.14 564536.42 172.81 6.00 MWD+IFR+MS 4767.27 69.15 225.48 4187.40 4115.40 6000358.82 564524.98 188.03 6.00 NF 4800.00 70.75 224.26 4198.62 4126.62 6000336.85 564503.49 217.25 6.00 MWD+IFR+MS 4848.30 73.12 222.51 4213.60 4141.60 6000303.20 564472.25 261.26 6.00 OA 4850.00 73.20 222.45 4214.09 4142.09 6000301.99 564471.16 262.82 6.00 MWD+IFR+MS 4900.00 75.67 220.68 4227.51 4155.51 6000265.68 564439.54 309.39 6.00 MWD+IFR+MS 4936.12 77.46 219.42 4235.90 4163.90 6000238.59 564417.17 343.58 6.00 TSBC 4950.00 78.15 218.95 4238.83 4166.83 6000228.00 564408.70 356.83 6.00 MWD+IFR+MS 5000.00 80.64 217.25 4248.03 4176.03 6000189.06 564378.72 405.02 6.00 MWD+IFR+MS 5050.00 83.14 215.57 4255.08 4183.08 6000148.97 564349.71 453.82 6.00 MWD+IFR+MS 5061.51 83.72 215.19 4256.40 4184.40 6000139.59 564343.17 465.13 6.00 OB 5067.12 84.00 215.00 4257.00 4185.00 6000135.00 564340.00 470.65 6.00 MPS-23 T1 b 5100.00 85.24 211.94 4260.08 4188.08 6000107.54 564322.19 503.15 10.00 MWD+IFR+MS 5150.00 87.15 207.31 4263.40 4191.40 6000063.98 564297.93 552.97 10.00 MWD+IFR+MS 5200.00 89.08 202.69 4265.05 4193.05 6000018.52 564277 .22 602.90 10.00 MWD+IFR+MS ) BP My Planning Report ') . . ..." .. ..... .... ,.. ..cF......:..I.oe..)nl...d..:.'.~.::..any:. BPAmOþo. . ,. Mihïepô¡nt . . :$né~:.; ., MpfSPäO' . . Well,' PlànMP$+23 .. ::~~él~~å.t~: '..PlåriMÞS~23... Survey :~ . . ... ..... ..... .. ..'''' .. . ..... . ..¡li\!;~;~:!f~]ltftk::~:;t' A, .Suii'ëyÇ~lc~,i~ti(jô1\J:êtitod:, Minim;~mêûï;VåtU'rê . . .., . ',Db::, prada. MD ft 5250.00 5280.03 5300.00 5400.00 5500.00 Incl Azim deg deg 91.01 198.08 92.17 195.31 92.17 195.31 92.17 195.31 92.17 195.31 Sys TVD ft 4193.02 4192.18 4191.43 4187.64 4183.86 TVD ft 4265.02 4264.18 4263.43 4259.64 4255.86 MapN ft 5999971.52 5999942.70 5999923.41 5999826.81 5999730.21 5564.96 92.17 195.31 4253.40 4181.40 5999667.46 5603.53 92.00 193.00 4252.00 4180.00 5999630.00 5632.10 90.49 192.19 4251.38 4179.38 5999602.08 5700.00 90.49 192.19 4250.80 4178.80 5999535.59 5800.00 90.49 192.19 4249.94 4177.94 5999437.68 5900.00 90.49 192.19 4249.08 4177.08 5999339.76 6000.00 90.49 192.19 4248.22 4176.22 5999241.85 6100.00 90.49 192.19 4247.36 4175.36 5999143.93 6200.00 90.49 192.19 4246.50 4174.50 5999046.01 6291.96 90.49 192.19 4245.72 4173.72 5998955.97 6300.00 90.45 191.71 4245.65 4173.65 5998948.09 6350.00 90.19 188.72 4245.37 4173.37 5998898.82 6400.00 89.93 185.73 4245.32 4173.32 5998849.17 6450.00 89.67 182.74 4245.49 4173.49 5998799.29 6500.00 89.41 179.75 4245.90 4173.90 5998749.30 6550.00 89.15 176.76 4246.52 4174.52 5998699.36 6579.46 89.00 175.00 4247.00 4175.00 5998670.00 6600.00 88.86 173.78 4247.38 4175.38 5998649.58 6650.00 88.51 170.79 4248.53 4176.53 5998600.12 6703.84 88.15 167.58 4250.10 4178.10 5998547.36 6800.00 88.15 167.58 4253.20 4181.20 5998453.69 6900.00 88.15 167.58 4256.43 4184.43 5998356.29 7000.00 88.15 167.58 4259.66 4187.66 5998258.88 7100.00 88.15 167.58 4262.89 4190.89 5998161.47 7200.00 88.15 167.58 4266.11 4194.11 5998064.06 7295.38 88.15 167.58 4269.19 4197.19 5997971.16 7300.00 88.27 167.33 4269.34 4197.34 5997966.66 7350.00 89.57 164.63 4270.28 4198.28 5997918.27 7400.00 90.88 161.93 4270.08 4198.08 5997870.53 7443.08 92.00 159.60 4269.00 4197.00 5997830.00 7450.00 92.42 159.60 4268.73 4196.73 5997823.54 7488.37 94.72 159.60 4266.35 4194.35 5997787.77 7500.00 94.72 159.60 4265.39 4193.39 5997776.94 7561.55 94.72 159.60 4260.33 4188.33 5997719.65 7600.00 93.11 161.25 4257.71 4185.71 5997683.62 7614.42 92.50 161.87 4257.00 4185.00 5997670.00 7624.65 91.89 161.87 4256.61 4184.61 5997660.31 7700.00 91.89 161.87 4254.13 4182.13 5997588.96 7800.00 91.89 161.87 4250.84 4178.84 5997494.27 7900.00 91.89 161.87 4247.55 4175.55 5997399.57 8000.00 91.89 161.87 4244.25 :4172.25 5997304.87 8068.49 91.89 161.87 4242.00 4170.00 5997240.01 8068.50 91.89 161.87 4242.00 4170.00 5997240.00 MapE ft 564260.22 564251.85 564246.75 564221.22 564195.68 VS ft 652.57 682.13 701.68 799.61 897.54 DLS deg/10OO 10.00 MWD+IFR+MS 10.00 End Dir : 5280.03' MD, 4264.1 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS Tool/Comment 564179.10 961.15 0.00 Start Dir6/100': 5564.96' MD 564170.00 998.77 6.00 MPS-23 T2 564164.02 1026.45 6.00 End Dir : 5632.1' MD, 4251.38 564150.27 1092.16 0.00 MWD+IFR+MS 564130.03 1188.93 0.00 MWD+IFR+MS 564109.78 1285.69 0.00 MWD+IFR+MS 564089.54 1382.46 0.00 MWD+IFR+MS 564069.29 1479.23 0.00 MWD+IFR+MS 564049.05 1575.99 0.00 MWD+IFR+MS 564030.43 1664.98 0.00 Start Dir 6/100' : 6291.96' MD 564028.84 1672.75 6.00 MWD+IFR+MS 564020.41 1720.67 6.00 MWD+IFR+MS 564014.56 1767.78 6.00 MWD+IFR+MS 564011.31 1813.95 6.00 MWD+IFR+MS 564010.66 1859.05 6.00 MWD+IFR+MS 564012.63 1902.97 6.00 MWD+IFR+MS 564015.00 1928.25 6.00 MPS-23 T3 564017.19 1945.58 6.00 MWD+IFR+MS 564024.33 1986.77 6.00 MWD+IFR+MS 564034.89 2029.41 6.00 End Dir : 6703.84' MD, 4250.1 564056.38 2103.88 0.00 MWD+IFR+MS 564078.72 2181.33 0.00 MWD+IFR+MS 564101.07 2258.79 0.00 MWD+IFR+MS 564123.42 2336.24 0.00 MWD+IFR+MS 564145.77 2413.69 0.00 MWD+IFR+MS 564167.08 2487.56 0.00 Start Dir 6/100' : 7295.38' MD 564168.12 2491.13 6.00 MWD+IFR+MS 564180.66 2528.97 6.00 MWD+IFR+MS 564195.46 2565.23 6.00 MWD+IFR+MS 564210.00 2595.13 6.00 MPS-23 T4 564212.47 2599.83 6.00 MWD+IFR+MS 564226.13 2625.85 6.00 End Dir : 7488.37' MD, 4266.3 564230.27 2633.73 0.00 MWD+IFR+MS 564252.16 2675.41 0.00 Start Dir6/100': 7561.55' MD 564265.32 2701.88 6.00 MWD+IFR+MS 564270.00 2712.03 6.00 MPS-23 T5 564273.27 2719.27 6.00 End Dir : 7624.65' MD, 4256.6 564297.33 2772.59 0.00 MWD+IFR+MS 564329.26 2843.37 0.00 MWD+IFR+MS 564361.19 2914.14 0.00 MWD+IFR+MS 564393.12 2984.92 0.00 MWD+IFR+MS 564415.00 3033.39 0.00 41/2" 564415.00 3033.40 0.00 MPS-23 T6 O...'.:'''..~p :. - -... COMPANY DETAILS ßP Arooco Cllculation Method: Minirmm a.v.hR = ~:= ~,;..W¿'~rxkr Nor1h Error Surrlce: EDip6cll + Cuing Wlrl1in~ Method: Rules Based REFERENCE INFORMA TJON Û><>Idinalc (N/E) Relên:nce: Wen c..me: !'Ian MPS-23, True Nonh Verticil (IVD) Rerermœ: S-Pld Dev 72.00 Seclion (VS) Rererence: Slot- (O.OON,O.OOE) Mearored Depth Relèreoce: S-i'Id Dev 72.00 Calculation MethxI: MiDirDIm a.v.nre All TVD depths are ssTVD plus 72'for RKBE. 3600- 3900- c 2 ~ õ.. Ö ~ t: > '" 4200 2 !- 4500 300 .9:::~~~~ ~ ~ #, ~ I~ 1# ,I I ;I I .I ; I #'# 7' 600 900 SURVEY PROGRAM Depth Fm Depth To SurveyIPIan 4827.00 807229 Planœd: MI'S-23L1 "'1'02 VI Plan: MPS-23Ll wp02 (plan MPS-23/Plan MPS-23Ll) Tool MWD+IFR+MS Creoled By: Ken AlIm Checked: Dale: 3/29/2002 Thlle: Reviewed: Date: Name +N/oS +F1.W NorIhing Easling Latitude Longitude SIoI Plan MPS.23 -13.24 -587.14 5999959.55 565758.06 70"24'37.198N 149"27'S2J80W N/A TARGET DETAILS Name 1VD +N/oS +F1-W Northing EasIir1g Shape MPS-23LI T6 4192.00 -2707.88 -1367.08 5997240.00 S64415.00 Poin' MPS-23L1 T3 4197.00 -1274.27 -175451 5998670.00 S64015.00 Pain' MPS-23LI T2 4202.00 -31559 -1591.05 5999630.00 564170.00 Point MI'S-23LI IS 4207.00 -2276.58 -150830 5997670.00 564270.00 Point MPS-23LI T4 4219.00 -2116.04 -1566.90 5997830.00 564210.00 Point SECTION DErAILS See MD Ine Azi TVD +N/-S +FJ-W DLeg TFaee VSee Target 1 4827.00 72.07 223.28 4207.23 369.88 -1269.02 0.00 0.00 241.73 2 4993.08 92.00 223.28 4230.12 250.74 -1381.20 12.00 0.00 398.65 3 5297.50 92.90 192.82 4216.81 -14.51 -1522.55 10.00 -87.69 699.13 4 5567.38 92.90 192.82 4203.18 -277.33 -1582.35 0.00 0.00 960.69 5 5606.63 90.54 192.82 4202.00 -315.59 -1591.05 6.00 179.95 998.77 MPS-23L1 T 6 5609.68 90.54 192.64 4201.97 -318.56 -1591.72 6.00 -90.13 1001.73 .--- 7 6271. 70 90.54 192.64 4195.74 -964.52 -1736.55 0.00 0.00 1643.63 8 6583.37 89.00 174.00 4197.00 -1274.27 -1754.51 6.00 -94.72 1928.25 MPS-23L1 T3 9 6688.15 88.15 167.77 4199.61 -1377.65 -1737.93 6.00 -97.81 2013.06 10 7296.42 88.15 167.77 4219.20 -1971.80 -1609.12 0.00 0.00 2485.39 11 7446.86 92.00 159.60 4219.00 -2116.04 -1566.90 6.00 -64.82 2595.13 MPS-23L1 T4 12 7492.15 94.72 159.60 4216.35 -2158.41 -1551.14 6.00 -0.07 2625.85 13 7565.34 94.72 159.60 4210.33 -2226.77 -1525.71 0.00 0.00 2675.41 14 7618.21 92.50 161.87 4207.00 -2276.58 -1508.30 6.00 134.27 2712.Q3 MPS-23L1 T5 15 7628.44 91.89 161.87 4206.61 -2286.29 -1505.12 6.00 -180.00 2719.27 16 8072.29 91.89 161.87 4192.00 -2707.88 -1367.08 0.00 0.00 3033.40 MPS-23L1 T6 CASING DETAILS No. TVD MD Name Size 4192.00 8072.28 4112" 4.500 FORMATION TOP DETAILS No. TVDPath MDPath Fonnation 4213.60 4849.32 OA 'lJ / -- 1200 1500 1800 2100 2400 2700 3000 Vertical Section at 206.790 [300ft/in] bp 0 COMPANY DETA'U; REFERENCE INFORMA nON SURVEY PROGRAM Depth Fm Deplb To S¡r,oeylPlan Tool MWD+IFR+MS OP Amoco Û><><dÍnale (NJE) Relërence: Wen Ceo!re: Plan MPS.23, True North Verûcal (IVD) Rererenee: S-Pad Dev 72.00 Sectioo (VS) Rererence: Slot. (O.OON,O.OOE) Measured Depth Relëreoœ: S-Pad Dev 72.00 Calculation Meth>d: MinímlÐ1 a.va..., 4827.00 8072.29 PIamed: Mps.23LI wp02 VI C.IcuI.,ÍO!I Method: Minimom C\uva..., ~ ~=: ~~v~~AiodcrNorlh r:rror Sur[>,.: Elliptical + Casing Wamil11\ M<Ihcd: Ru/.... Uased ~ 1: 0 ~ :; 0 CI) Name Plan MPS.23 +NI-S +FJ-W 500- .13.24 .581.14 5999959.55 Plan: MPS.23L1 wp02 (Plan MPS.23/Plan MPS.23L1) Created By: Ken Allen Date: 3/29/2002 Checked: Dale: Reviewed: Date: WELL DETAII.$ Notthing Easting Lat- Loogilude Slot 565758.06 70024'37.198N 149'27'S2.380W NlA TARGET DETAILS Name 1VD +NI-S +FJ.W Northing Easting Shape MPS-23LI T6 4192.00 .2707.88 .1367.08 5991240.00 564415.00 Point MPS.23LI T3 4197.00 .1274.27 .1754.51 5998670.00 564015.00 Point MPS-23L1 1'2 4202.00 .315.59 .1591.05 5999630.00 564110.00 Point MPS-23LI T5 4207.00 .2276.58 .1508.30 5991610.00 564270.00 Point SECTION DETAILS See MD Ine Azi TVD +N/-S +FJ-W DLeg TFaee VSee Target 1 4827.00 72.07 223.28 4207.23 369.88 -1269.02 0.00 0.00 241.73 2 4993.08 92.00 223.28 4230.12 250.74 -1381.20 12.00 0.00 398.65 3 5297.50 92.90 192.82 4216.81 -14.51 -1522.55 10.00 -87.69 699.13 4 5567.38 92.90 192.82 4203.18 -277.33 -1582.35 0.00 0.00 960.69 5 5606.63 90.54 192.82 4202.00 -315.59 -1591.05 6.00 179.95 998.77 MPS-23L1 T2 6 5609.68 90.54 192.64 4201.97 -318.56 -1591.72 6.00 -90.13 1001.73 7 6271.70 90.54 192.64 4195.74 -964.52 -1736.55 0.00 0.00 1643.63 MPS-23L1 T3--- 8 6583.37 89.00 174.00 4197.00 -1274.27 -1754.51 6.00 -94.72 1928.25 9 6688.15 88.15 167.77 4199.61 -1377.65 -1737.93 6.00 -97.81 2013.06 10 7296.42 88.15 167.77 4219.20 -1971.80 -1609.12 0.00 0.00 2485.39 11 7446.86 92.00 159.60 4219.00 -2116.04 -1566.90 6.00 -64.82 2595.13 MPS-23L1 T4 12 7492.15 94.72 159.60 4216.35 -2158.41 -1551.14 6.00 -0.07 2625.85 13 7565.34 94.72 159.60 4210.33 -2226.77 -1525.71 0.00 0.00 2675.41 14 7618.21 92.50 161.87 4207.00 -2276.58 -1508.30 6.00 134.27 2712.03 MPS-23L1 T5 15 7628.44 91.89 161.87 4206.61 -2286.29 -1505.12 6.00 -180.00 2719.27 16 8072.29 91.89 161.87 4192.00 -2707.88 -1367.08 0.00 0.00 3033.40 MPS-23L1 T6 FORMATION TOP DETAILS No. TVDPath MDPath Fonnation 1 4213.60 4849.32 OA CASING DETAILS No. TVD MD Name Size 4192.00 8072.28 41/2" 4.500 .500 All TVD depths are ssTVD plus 72'for RKBE. I -1000 -1500 ~ II IgP I I I I I ~ I ø'# l' ~~?< ~ .;~;:~ ~~ #,~ -2000 I I -1000 Wesl{-)Æast{+) [500ft/in] I -500 I 0 -1500 .~ ) BP My Planning Report Company: BP Amoco Field: Milne Point Site: M Pt S Pad Well: Plan MPS-23 Wellpath: Plan MPS-23L 1 Date: 3/29/2002 Time: 08:31 :21 Page: Co-ordinate(NE) Reference: Well: Plan MPS-23, True North Vertical (rVD) Reference: S-Pad Dev 72.0 SeCtion (VS) Reference: Well (0.00N,0.00E,206.79Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Field: Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2001 Site: M Pt S Pad Site Position: From: Map Position Uncertainty: Ground Level: Northing: 5999978.00 ft Easting: 566345.00 ft Latitude: Longitude: North Reference: Grid Convergence: 70 24 37.329 N 149 27 35.171 W True 0.51 deg 0.00 ft 0.00 ft Well: Plan MPS-23 Slot Name: Well Position: +N/-S -13.24 ft Northing: 5999959.55 ft +E/-W -587.14 ft Easting: 565758.06 ft Position Uncertainty: 0.00 ft Latitude: Longitude: 70 24 37.198 N 149 27 52.380 W Wellpath: Plan MPS-23L 1 +N/-S ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Plan MPS-23 4827.00 ft Mean Sea Level 26.03 deg 80.79 deg . Direction deg 206.79 3/27/2002 1 From: Definitive Path Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 3/26/2002 57471 nT Depth From (TVD) ft 0.00 Height 72.00 ft Plan: MPS-23L 1 wp02 Date Composed: Version: Tied-to: Principal: Yes Casing Points TVD. ..DiaD1~t~r . . Hole Size . 'ft ....in. . .in . 8072.28 4192.00 4.500 6.750 41/2" Plan Section Information . MD Incl. . )Azim. TVD. *Nï~s. ..+E/~W ..DLS .. . Iluild Turn. ... T,FO .. T~rget ft deg. 'deg. ft. ft. ft ~eg/1 pOft deg/tOOft deg/10qft. ..deg 4827.00 72.07 223.28 4207.23 369.88 -1269.02 0.00 0.00 0.00 0.00 4993.08 92.00 223.28 4230.12 250.74 -1381.20 12.00 12.00 0.00 0.00 5297.50 92.90 192.82 4216.81 -14.51 -1522.55 10.00 0.29 -10.01 -87.69 5567.38 92.90 192.82 4203.18 -277.33 -1582.35 0.00 0.00 0.00 0.00 5606.63 90.54 192.82 4202.00 -315.59 -1591.05 6.00 -6.00 0.00 179.95 MPS-23L 1 T2 5609.68 90.54 192.64 4201.97 -318.56 -1591.72 6.00 -0.01 -6.00 -90.13 6271.70 90.54 192.64 4195.74 -964.52 -1736.55 0.00 0.00 0.00 0.00 6583.37 89.00 174.00 4197.00 -1274.27 -1754.51 6.00 -0.49 -5.98 -94.72 MPS-23L 1 T3 6688.15 88.15 167.77 4199.61 -1377.65 -1737.93 6.00 -0.81 -5.95 -97.81 7296.42 88.15 167.77 4219.20 -1971.80 -1609.12 0.00 0.00 0.00 0.00 7446.86 92.00 159.60 4219.00 -2116.04 -1566.90 6.00 2.56 -5.43 -64.82 MPS-23L 1 T 4 7492.15 94.72 159.60 4216.35 -2158.41 -1551.14 6.00 6.00 -0.01 -0.07 7565.34 94.72 159.60 4210.33 -2226.77 -1525.71 0.00 0.00 0.00 0.00 7618.21 92.50 161.87 4207.00 -2276.58 -1508.30 6.00 -4.19 4.30 134.27 MPS-23L 1 T5 7628.44 91.89 161.87 4206.61 -2286.29 -1505.12 6.00 -6.00 0.00 -180.00 8072.29 91.89 161.87 4192.00 -2707.88 -1367.08 0.00 0.00 0.00 0.00 MPS-23L 1 T6 ) BP My Planning Report ') Targets Map Map <- Latitude --> <- Longitude -> Name Description TVD +N/-S +E/- W Northing Easting Deg Min See Deg Min See Dip. Dir. ft ft ft ft ft MPS-23L 1 T6 4192.00 -2707.88 -1367.08 5997240.00 564415.00 70 24 10.565 N 149 28 32.435 W MPS-23L 1 T3 4197.00 -1274.27 -1754.51 5998670.00 564015.00 70 24 24.664 N 149 28 43.797 W MPS-23L 1 T2 4202.00 -315.59 -1591.05 5999630.00 564170.00 70 24 34.093 N 149 28 39.013 W MPS-23L 1 T5 4207.00 -2276.58 -1508.30 5997670.00 564270.00 70 24 14.807 N 149 28 36.576 W MPS-23L 1 T 4 4219.00 -2116.04 -1566.90 5997830.00 564210.00 70 24 16.386 N 149 28 38.294 W Survey 4827.00 72.07 223.28 4207.23 4135.23 6000318.21 564485.95 241.73 0.00 Start Dir 12/100' : 4827' MD, 4850.00 74.83 223.28 4213.78 4141.78 6000302.03 564470.98 262.87 12.00 MWD+IFR+MS 4875.00 77.83 223.28 4219.69 4147.69 6000284.20 564454.49 286.16 12.00 MWD+IFR+MS 4900.00 80.83 223.28 4224.31 4152.31 6000266.17 564437.81 309.71 12.00 MWD+IFR+MS 4925.00 83.83 223.28 4227.65 4155.65 6000247.99 564420.99 333.47 12.00 MWD+IFR+MS 4950.00 86.83 223.28 4229.68 4157.68 6000229.70 564404.07 357.36 12.00 MWD+IFR+MS 4975.00 89.83 223.28 4230.41 4158.41 6000211.36 564387.11 381.32 12.00 MWD+IFR+MS 4993.08 92.00 223.28 4230.12 4158.12 6000198.10 564374.83 398.65 12.00 Start Dir 10/100' : 4993.08' M 5000.00 92.03 222.58 4229.88 4157.88 6000192.99 564370.17 405.29 10.00 MWD+IFR+MS 5050.00 92.22 217.58 4228.03 4156.03 6000154.49 564338.34 453.90 10.00 MWD+IFR+MS 5100.00 92.39 212.58 4226.01 4154.01 6000113.38 564310.00 503.32 10.00 MWD+IFR+MS 5150.00 92.55 207.58 4223.85 4151.85 6000069.95 564285.36 553.18 10.00 MWD+IFR+MS 5200.00 92.69 202.58 4221.57 4149.57 6000024.55 564264.59 603.09 10.00 MWD+IFR+MS 5250.00 92.80 197.57 4219.17 4147.17 5999977.51 564247.87 652.67 10.00 MWD+IFR+MS 5297.50 92.90 192.82 4216.81 4144.81 5999931.64 564235.84 699.13 10.00 End Dir : 5297.5' MD, 4216.81 5300.00 92.90 192.82 4216.68 4144.68 5999929.20 564235.31 701.56 0.00 MWD+IFR+MS 5400.00 92.90 192.82 4211.63 4139.63 5999831.63 564214.01 798.47 0.00 MWD+IFR+MS 5500.00 92.90 192.82 4206.58 4134.58 5999734.06 564192.72 895.39 0.00 MWD+IFR+MS 5567.38 92.90 192.82 4203.18 4131.18 5999668.33 564178.37 960.69 0.00 Start Dir 6/100' : 5567.38' MD 5600.00 90.94 192.82 4202.09 4130.09 5999636.48 564171.41 992.33 6.00 MWD+IFR+MS 5606.63 90.54 192.82 4202.00 4130.00 5999630.00 564170.00 998.77 6.00 MPS-23L 1 T2 5609.68 90.54 192.64 4201.97 4129.97 5999627.02 564169.35 1001.73 6.00 End Dir : 5609.68' MD, 4201.9 5700.00 90.54 192.64 4201.12 4129.12 5999538.73 564150.37 1089.30 0.00 MWD+IFR+MS 5800.00 90.54 192.64 4200.18 4128.18 5999440.98 564129.36 1186.26 0.00 MWD+IFR+MS 5900.00 90.54 192.64 4199.24 4127.24 5999343.23 564108.35 1283.22 0.00 MWD+IFR+MS 6000.00 90.54 192.64 4198.30 4126.30 5999245.47 564087.33 1380. 19 0.00 MWD+IFR+MS 6100.00 90.54 192.64 4197.35 4125.35 5999147.72 564066.32 1477.15 0.00 MWD+IFR+MS 6200.00 90.54 192.64 4196.41 4124.41 5999049.97 564045.30 1574.11 0.00 MWD+IFR+MS 6271.70 90.54 192.64 4195.74 4123.74 5998979.87 564030.23 1643.63 0.00 Start Dir6/100': 6271.7' MD, 6300.00 90.40 190.94 4195.50 4123.50 5998952.13 564024.70 1670.96 6.00 MWD+IFR+MS 6350.00 90.15 187.96 4195.26 4123.26 5998902.75 564016.92 1718.69 6.00 MWD+IFR+MS 6400.00 89.90 184.97 4195.24 4123.24 5998853.03 564011.74 1765.57 6.00 MWD+IFR+MS 6450.00 89.66 181.98 4195.43 4123.43 5998803.11 564009.15 1811.48 6.00 MWD+IFR+MS 6500.00 89.41 178.99 4195.84 4123.84 5998753.12 564009.17 1856.29 6.00 MWD+IFR+MS 6550.00 89.16 176.00 4196.46 4124.46 5998703.20 564011.80 1899.89 6.00 MWD+IFR+MS 6583.37 89.00 174.00 4197.00 4125.00 5998670.00 564015.00 1928.25 6.00 MPS-23L 1 T3 6600.00 88.86 173.01 4197.31 4125.31 5998653.50 564017.03 1942.15 6.00 MWD+IFR+MS 6650.00 88.46 170.04 4198.48 4126.48 5998604.13 564024.83 1982.96 6.00 MWD+IFR+MS 6688.15 88.15 167.77 4199.61 4127.61 5998566.78 564032.50 2013.06 6.00 End Dir : 6688.15' MD, 4199.6 6700.00 88.15 167.77 4199.99 ; 4127.99 5998555.23 564035.11 2022.26 0.00 MWD+IFR+MS I t,"", ~ ) BP My Planning Report ) . ...... .. .;qP~Pâ~Y;, ~PAn1oqd . . . .. Milrle Pijiht ... MA(sea~ '. ., ... . ... Plan MPS+23. . .. êât~~, Pla~::~PS:'23L1 Survey . .~ ~: :;. : . .. :.~a~\~~rJW~t:;J~~~r~~~~~]~~23i~~:No~~:. ::~:W~;~~r]~f~~~~e~:~~?d:.. ..~~I¡~~~Ögü~~~~;P9?9Až~b:. 6800.00 88.15 167.77 4203.21 4131.21 5998457.75 564057.14 2099.91 0.00 MWD+IFR+MS 6900.00 88.15 167.77 4206.43 4134.43 5998360.27 564079.17 2177.56 0.00 MWD+IFR+MS 7000.00 88.15 167.77 4209.65 4137.65 5998262.79 564101.20 2255.22 0.00 MWD+IFR+MS 7100.00 88.15 167.77 4212.87 4140.87 5998165.31 564123.24 2332.87 0.00 MWD+IFR+MS 7200.00 88.15 167.77 4216.10 4144.10 5998067.83 564145.27 2410.52 0.00 MWD+IFR+MS 7296.42 88.15 167.77 4219.20 4147.20 5997973.85 564166.51 2485.39 0.00 Start Oil' 6/100' : 7296.42' MD 7300.00 88.25 167.57 4219.31 4147.31 5997970.36 564167.31 2488.17 6.00 MWD+IFR+MS 7350.00 89.52 164.86 4220.29 4148.29 5997921.92 564179.65 2526.14 6.00 MWD+IFR+MS 7400.00 90.80 162.14 4220.15 4148.15 5997874.12 564194.26 2562.53 6.00 MWD+IFR+MS 7446.86 92.00 159.60 4219.00 4147.00 5997830.00 564210.00 2595.13 6.00 MPS-23L1 T4 7450.00 92.19 159.60 4218.89 4146.89 5997827.07 564211.12 2597.26 6.00 MWD+IFR+MS 7492.15 94.72 159.60 4216.35 4144.35 5997787.77 564226.13 2625.85 6.00 End Dir : 7492.15' MD, 4216.3 7500.00 94.72 159.60 4215.70 4143.70 5997780.47 564228.92 2631.16 0.00 MWD+IFR+MS 7565.34 94.72 159.60 4210.33 4138.33 5997719.65 564252.16 2675.41 0.00 Start Dir 6/100' : 7565.34' MD 7600.00 93.26 161.09 4207.92 4135.92 5997687.19 564264.07 2699.24 6.00 MWD+IFR+MS 7618.21 92.50 161.87 4207.00 4135.00 5997670.00 564270.00 2712.03 6.00 MPS-23L 1 T5 7628.44 91.89 161.87 4206.61 4134.61 5997660.31 564273.27 2719.27 6.00 End Dir : 7628.44' MD, 4206.6 7700.00 91.89 161.87 4204.25 4132.25 5997592.55 564296.12 2769.91 0.00 MWD+IFR+MS 7800.00 91.89 161.87 4200.96 4128.96 5997497.85 564328.05 2840.69 0.00 MWD+IFR+MS 7900.00 91.89 161.87 4197.67 4125.67 5997403.15 564359.98 2911.46 0.00 MWD+IFR+MS 8000.00 91.89 161.87 4194.38 4122.38 5997308.46 564391.92 2982.24 0.00 MWD+IFR+MS 8072.29 91.89 161.87 4192.00 4120.00 5997240.00 564415.00 3033.40 0.00 MPS-23L 1 T6 i 206924 DATE INVOICE I CREDIT MEMO 5/13/02 CK052302G / -YY\P5 -13 ~ ~ I ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 PAY ') DESCRIPTION Permit To Dril~ Fee GROSS Pls call Terrie Hubble X4628 TOTAL ~ DATE ) OS/28/02 56"389 4'12 8' ...........p........... ~.'y....r..'" ....[.,.., "dUh l.fl/b~ ..(.....}. f,.ql.I..(...,.t...I., . ,.. ... Ii.. .. l I .¡' ...1...,. tl." .. ~..... . .. . ,.1 .... "",i "11111 UIII.'- .,; ", TO THE ORDER OF Alaska Oil & Gas Conservation Commiss.ion 333 W 7th Ave, StelQO AnchQrage,AK 99501 VENDOR DISCOUNT CHECK NO. H206924 NET $100.00 $100.00 FIRST NATIONAL BANK .OF ASHLAND AN AFFlUATE OF NATIONAL CITY BANK CLEVELAND, OHIO No.H 20 S 924 DATE.. CONSOLIDATED COMMERCIAL ACCOUNT AMOUNT ***May 28, 2002*** *****$100.00****** . NorVALlD AFTER. 120 DAYS III 2 0 b '1 2'" III I: 0... ~ 2 0 j a '1 5 I: 0 0 a ...... ~ '1111 (4i<:---~i< 'i Ii \.'~()~'J.Q , CHECK 1 ST ANDARD LETTER DEVELOPMENT v DEVELOPMENT REDRILL EXPLORATION INJECTION WELL INJECTION WELL RED RILL Rev: 5/6/02 C\jody\templates ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER , \, ) WELL NAME #,PS-2- 5' CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) PILOT HOLE (PH) "CLUE" The permit is for a new wellbore segment of existing well -' Permit No, API No. Production should continue to be reported as a function of the original API number stated above. In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). ANNULAR DISPOSAL Please note that an disposal of fluids generated. . . INTO ANNULUS OF ANOTHER WELL ON SAME PAD <-> SPACING EXCEPTION Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. WELLPERMITCHECKLlST COMPANY ßPX WELLNAME/7PL\-?.$ PROGRAM: Exp- DevK Redrll- Se~- Wellboreseg- Ann.disposalparareq- FIELD & POOL ,f'/J.<5/¿¡t'J INITCLASS //P.v /-~.// GEOLAREA r;7t1 UNIT# II ~2.. t' ON/OFF SHORE OAJ . ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . R N 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . I Y N 3. Unique well name and number. .. . . . . . . . . . . . . . . . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. . . . Y , N 6. Well located proper distance from other wells.. . . . . . . . . Y , N 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N 8. If deviated. is wellbore plat included.. . . . . . . . . . . . . . Y N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N A~. AE R ]~T~ } 12. Permit can be issued without administrative approval.. . . . . N "frl". r ~/ðZ.- 13. Can permit be approved before 15-day wait.. . . . . . . . . . N ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . N '20'1 @ i' ~ t 15. Surface casing protects all known USDWs. . . . . . . . . . . N 16. CMT vol adequate to circulate on conductor & surf csg. . . . . æ. N 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . -¥-* All A- . 18. CMT will cover aU known Productiv.e horizons. . . . . . . . . . ~y iD S¡,pt.k' [, A..£y 19. Casing designs adequate for C. T, B & permafrost. . . . . . . 'f;í 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N () tLljrw-- I ct/. 21. If a re-drill, has a 10-403 for abandonment been approved. . . .¥--N- /\LIlt 22. Adequate well bore separation proposed.. . . . . . . . . .-. . N 23. If diverter required. does it meet regulations. . . . . . . . . . N 24, Drilling fluid program schematic & equip list adequate. . . . . N 25. BOPEs. do they meet regulation. . . . . . . . . . . . . . . . N -h t 26. BOPE press rating appropriate; test to é./-Ovo psig. N ¡r/¿Ç() 14ii pi£' , tttty( C£¡ ~s 5S-0o f (.1.1, 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N 28. Work will occur without operation shutdown. . . . . . . . . . . N 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y c1V GEOLOGY 30. Permit can be issued wlo hydrogen sulfide measures. . . . . fY}N 31. Data presented on potential overpressure zones. . . . . . . )VN /J 32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . . . . . Y ,/1.J¡ M . ~ß~ J>~TE} 33. Seabed condition survey (If off-shore). . . . . . . . . . . . . N ~rt'- .f-ý:2.,//ð/:- 34. Contact namelphone for weekly progress reports [exploratory on - Y N ANNULAR DISPOSAL 35. With proper cementing records. this plan (A) will contain waste in a suitable receiving zone; . . . . . . . Y N (B) will not contaminate freshwater; or cause drilling waste. .. Y to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from pool; and (E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION: RP~ JDH .:.Jr COT. WGA vJ6þY DTS (l~ f ?.:,s l () 'è APPR DA T~ \e.i4k "{Wlo 1.. ( APPR DATE ~ 9~Þ¿ A~~-,q. Comments/Instructions: G:\geology\permits\checklist.doc ) ') Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Pennitting Process. but is part of the history file. To improve the readability of the Well History file and to simplrty finding infonnation, infonnation of this nature is accumulated at the end of the file under APPEN,DIX. No special effort has been made to chronologically organize this category of information. ') a Cb}-13d I / a r:5 Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Nov 06 07:15:00 2002 Reel Header Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .02/11/06 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .02/11/06 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-23 500292309800 BP Exploration (Alaska), Inc. Sperry-Sun Drilling Services 06-NOV-02 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 1 AK-MW-22108 B. HENNINGSE E. VAUGHN MWDRUN 2 AK-MW-22108 B. HENNINGSE E. VAUGHN MWDRUN 3 AK-MW-22108 J. STRAHAN C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3293 253 MSL 0) 67.10 39.60 # WELL CASING RECORD 1ST STRING 2ND STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 20.000 110.0 6.125 7.625 5224.0 ) 3 RD STRING PRODUCTION STRING # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1, 2, AND 3 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 8/29/02. MWD DATA ARE CONSIDERED PDC. 5. MWD RUNS 1, 2, AND 3 REPRESENT WELL MPS-23 WITH API#: 50-029- 23098-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8110'MD/4189'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/11/06 Maximum physical Record. .65535 File Type.... . . . . . . . . . . . .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX 1 clipped curves; all bit runs merged. .5000 START DEPTH 60.5 70.0 70.0 70.0 70.0 70.0 STOP DEPTH 8056.5 8063.5 8063.5 8063.5 8063.5 8063.5 ) ROP $ 110.5 8109.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED PBU MWD MWD MWD $ DATA SOURCE TOOL CODE BIT RUN NO MERGE TOP 1 60.5 2 2772.5 3 5234.5 MERGE BASE 2772.5 5234.5 8109.5 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 60.5 8109.5 4085 16099 60.5 8109.5 ROP MWD FT/H 1.4 1553.33 270.031 15999 110.5 8109.5 GR MWD API 11.95 134.53 71.4 15993 60.5 8056.5 RPX MWD OHMM 0.18 2000 279.083 15988 70 8063.5 RPS MWD OHMM 0.16 2000 235.055 15988 70 8063.5 RPM MWD OHMM 0.2 2000 188.84 15988 70 8063.5 RPD MWD OHMM 0.1 2000 156.035 15988 70 8063.5 FET MWD HOUR 0.05 58.81 0.731945 15988 70 8063.5 First Reading For Entire File......... .60.5 Last Reading For Entire File.......... .8109.5 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/11/06 Maximum Physical Record. .65535 ) F i 1 e Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .02/11/06 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 2 ) header data for each bit run in separate files. 1 .5000 START DEPTH 60.5 70.0 70.0 70.0 70.0 70.0 110.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 2722.0 2732.0 2732.0 2732.0 2732.0 2732.0 2772.5 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): 30-JUN-02 Insite 66.37 Memory 2772.0 60.5 2722.0 .1 37.0 TOOL NUMBER 136694 151812 9.875 110.0 Spud Mud 9.30 250.0 7.5 1000 ) ) FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 10.0 4.500 4.293 4.000 5.000 68.0 71.6 68.0 68.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWD010 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 FET MWD010 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 60.5 2772.5 1416.5 5425 60.5 2772.5 ROP MWD010 FT/H 10.29 1553.33 337.992 5325 110.5 2772.5 GR MWD010 API 16.65 119.51 62.4946 5324 60.5 2722 RPX MWD010 OHMM 0.18 2000 799.878 5325 70 2732 RPS MWD010 OHMM 0.16 2000 665.672 5325 70 2732 RPM MWD010 OHMM 0.2 2000 519.559 5325 70 2732 RPD MWD010 OHMM 0.1 2000 406.189 5325 70 2732 FET MWD010 HOUR 0.05 1.69 0.266432 5325 70 2732 First Reading For Entire File......... .60.5 Last Reading For Entire File.......... .2772.5 File Trailer Service name............ .STSLIB.002 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .02/11/06 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .02/11/06 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR FET RPD RPM RPS RPX ROP $ 3 ) header data for each bit run in separate files. 2 .5000 START DEPTH 2722.5 2732.5 2732.5 2732.5 2732.5 2732.5 2773.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (~T): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 5184.0 5193.5 5193.5 5193.5 5193.5 5193.5 5234.5 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): 02-JUL-02 Insite 66.37 Memory 5234.0 2723.0 5183.5 32.6 88.1 TOOL NUMBER 136694 151812 9.875 110.0 Water 9.15 147.0 8.0 800 8.8 Based ) ') RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 5.000 3.356 6.000 5.000 70.0 107.6 70.0 70.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units. . . . . . . . . . .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2722.5 5234.5 3978.5 5025 2722.5 5234.5 ROP MWD020 FT/H 2.46 1251.83 291.269 4924 2773 5234.5 GR MWD020 API 11.95 118.61 70.2714 4924 2722.5 5184 RPX MWD020 OHMM 3.24 218.91 14.1011 4923 2732.5 5193.5 RPS MWD020 OHMM 3.3 251.85 14.2447 4923 2732.5 5193.5 RPM MWD020 OHMM 3.91 214.35 14.6176 4923 2732.5 5193.5 RPD MWD020 OHMM 4.5 179.02 15.2111 4923 2732.5 5193.5 FET MWD020 HOUR 0.05 7.76 0.546181 4923 2732.5 5193.5 First Reading For Entire File......... .2722.5 Last Reading For Entire File.......... .5234.5 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/11/06 Maximum Physical Record. .65535 File Type.. . . . . . . . . . . . . . .LO Next File Name.......... .STSLIB.004 ,) Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name, . . Version Number.......... .1.0.0 Date of Generation...... .02/11/06 Maximum Physical Record. .65535 File Type............. . . . LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 4 ) header data for each bit run in separate files. 3 .5000 START DEPTH 5184.5 5194.0 5194.0 5194.0 5194.0 5194.0 5235.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 8056.5 8063.5 8063.5 8063.5 8063.5 8063.5 8109.5 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) 05-JUL-02 Insite 66.37 Memory 8110.0 5181.0 8056.5 85.9 100.1 TOOL NUMBER 62456 73634 6.125 5224.0 FLO-PRO 9.20 49.0 8.5 38000 4.2 ) ) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: .100 .082 .100 .130 73.0 90.4 73.0 73.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5184.5 8109.5 6647 5851 5184.5 8109.5 ROP MWD030 FT/H 1.4 412.54 188.906 5750 5235 8109.5 GR MWD030 API 31.41 134.53 80.6201 5745 5184.5 8056.5 RPX MWD030 OHMM 0.23 1805.97 23.2076 5740 5194 8063.5 RPS MWD030 OHMM 0.27 1743.32 24.9525 5740 5194 8063.5 RPM MWD030 OHMM 0.26 2000 31.4559 5740 5194 8063.5 RPD MWD030 OHMM 4.95 2000 44.7475 5740 5194 8063.5 FET MWD030 HOUR 0.15 58.81 1.32313 5740 5194 8063.5 First Reading For Entire File......... .5184.5 Last Reading For Entire File.......... .8109.5 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/11/06 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Next File Name.......... .STSLIB.005 ) Physical EOF Tape Trailer Service name. . . . . . . . . . . . .LISTPE Date.................... .02/11/06 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Reel Trailer Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .02/11/06 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Physical EOF Physical EOF End Of LIS File ) Writing Library. Scientific Technical Services Writing Library. Scientific Technical Services