Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-132
) )
Image Project Order File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
d. 0;),. - 13~ Order File Identifier
Organizing (done)
0 Two-sided
1111111111111111111
D Rescan Needed 1I11I n 1111111111
RESCAN
DIGITAL DATA
~skettes, No. ~
0 Other, No/Type:
OVERSIZED (Scannable)
0 Maps:
0 Color Items:
0 Greyscale Items:
0 Other Items Scannable by
a Large Scanner
0 Poor Quality Originals:
OVERSIZED (Non-Scannable)
0 Other:
0 Logs of various kinds:
NOTES:
Scanning Preparation
BY: Helen ~
d.. X 30 = 00
+
0 Other::
Date: ro /:;)£; lð t Isl V)I1.p
DatefJ!;JG/ b ~IIII~~/"II ~ P
I = TOTAL PAGES hI
(coun~. dO,s not ~n~ude cover sþJ(~.e )p
Date:'6 / :15"/ ó Lj /5/ YJI/
1111111111111111111
BY:
Helen ~~ia)
Project Proofing
BY:
Helen ~
BY:
Production Scanning
Stage 1 Page Count from Scanned File: h:)-- (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: 0ES
I
Helen CM~ia) Date:1f áo
.
YES
NO
ð l- Isl .¡N( P
Stage 1
If NO in stage 1 page(s) discrepancies were found:
NO
BY:
Helen Maria
Date:
/s/
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Helen Maria
Date:
/5/
Comments about this file:
Quality Checked
1111111111111111111
8/24/2004 Orders File Cover Page.doc
• •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 30, 2011 S AN E D rIB 2 4 2012
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission _ ) 3
333 West 7 Avenue ao
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of MPS -Pad t r 1
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely, ri )
Mehreen Vazir
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
MPS -Pad
10/11/2011
Corrosion
• Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011
MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011
MPS-03 2021460 50029231050000 Open Flutes - Treated
MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-05 2021370 50029231000000 Open Flutes - Treated
MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009
MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011
MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009
MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011
MPS -11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011
MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011
MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009
MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011
MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011
MPS-16 2030650 50029231510000 1.2 NA 1.2 NA 102 7/29/2011
MPS -17 2021730 50029231150000 Open Flutes - Treated
MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011
MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009
MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011
` MPS-23 2021320 50029230980000 , Open Flutes - Treated
MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011
MPS -25 2021030 50029230890000 Open Flutes - Treated
MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011
MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011
MPS-28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011
MPS -29 2021950 50029231190000 Open Flutes - Treated
MPS-30 2022360 , 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS -31 2020140 50029230660000 Open Flutes - Treated
MPS -32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011
MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011
MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011
MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS-37 2070520 50029233550000 13.9 Need top job NA
MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011
MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA
MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011
MPS-90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011
MPSB -04 , 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc
Permit to Drill 2021320
MD 8110 ¡/
REQUIRED INFORMATION
DATA INFORMATION
l ~ I~ ~ '-\
DATA SUBMITTAL COMPLIANCE REPORT
8/2/2004
11 ~,J.. ) c¡ J ~ w. Jv01 J-
API No. 50-029-23098-00-00
Well Name/No. MILNE PT UNIT SB S-23
Operator BP EXPLORATION (ALASKA) INC
lVD 4189 --/ Completion Date 7/10/2002 / Completion Status 1-01L
Current Status 1-01L
UIC N .--
Mud Log No
<.~~.~:--..
Directional SurveYí~-Yes )
l--"..~-
Samples No
MWD, GR, RES, ABIIIFR. CASANDRA
(data taken from Logs Portion of Master Well Data Maint)
Types Electric or Other Logs Run:
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
~ 0 (jn85 LIS Verification
i
I
I
I
i
i
I Rpt
I
i- ED c...o
~t ~
~C
~2
Log Log Run
Scale Media No
1
Interval OH /
Start Stop CH Received Comments
60 8056 Open 11/19/2002
--
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 6/21/2002.
0 8110 Open 8/1/2002 MWD
0 8110 Open 8/1/2002
0 8110 Open 8/1/2002 MWD
60 8056 Open 11/19/2002
110 8110 Case 2/28/2003 Digital Well Logging data
0 8110 Open 8/1/2002
60 8109
110 8110 Case ROP, EWR, DGR
110 8110 Case ROP, EWR, DGR
Sample
Set
Sent Received Number Comments
--
Directional Survey
Directional Survey
Directional Survey
LIS Verification
CAse
C Pdf
C Pdf
Directiohal...SQrV~Y
<11756 LIS Verification
~56 Rate of Penetration
11756 Induction/Resistivity
Rpt
i~
Well Cores/Samples
Name
25
25
Information:
Interval
Start Stop
DATA SUBMITTAL COMPLIANCE REPORT
8/2/2004
Permit to Drill 2021320
Well Name/No. MILNE PT UNIT SB S-23
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23098-00-00
MD 8110
lVD 4189
Completion Date 7/10/2002
Completion Status 1-01L
Current Status 1-01L
UIC N
ADDITIONAL INFORMATION
Well Cored?
V{!D
Daily History Received?
~
WN
(!yN
Chips Received?'--v+N....,
Formation Tops
Analysis
Received?
Ylt-.J
Comments:
-
Compliance Reviewed By:
llJ-a
Date:
I ~ ~~ kJ'ì ~ "'I
'-
')
)
~O~ ---\3d-
WELL LOG TRANSMI'ITAL
To:
State of Alaska
Alaska Oil and Gas Conservation Conun.
Attn.: Lisa Weepie
333 West 7t1\ Avenue, Suite 100
Pu1chorage,AJaska 99501
February 25, 2003
RE: MWD Formation Evaluation Logs:
MPS-23,
AK-MW-22108
MPS-23:
Digital Log Images:
50-029- 23098-00
1 CD Rom
" J 1 '?/O
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Atto: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-")
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date: Ie I l D . 0 3
Signed ¿;¿~ ßvvr
9 \~'.08\ (H ~I. tj,~.
, F' C 11""'" I', Þ .:"".', iJ'
'i~~ ,\11- ,1
0 .1;"t.':'.{ I;/" ~\ \: \;" ~,. ,.," ,,,,....'
{--'''II\. '!<).a.."¡;ril. 'i~,:. il'L¡''''''I~ '" 'Ii
~P? ."' ..~' ~..', '
t~;¿,t:~.
:. ~~... .
. .~ . :... , , '\
. '. .'
\
II
)
I
1159
~D~-~
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
J\nchorage,AJaska 99501
February 25, 2003
RE: MWD Formation Evaluation Logs: MPS-23,
AK-MW-22 1 08
M.PS-23:
Digital Log Images:
50-029-23098-00
1 CD Rom
. ,
PLEASE ACKNOWLEDG.E REC.EIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF TH.E TRANSMITTAL LEITER TO TH.E ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Sign&~
I
RECEIVED
FEB 28 2003
Alas1œ Oii & Gas Cons. Commlseton
Anchorage
)
)
a CB- /3d
11~?5
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Conun.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 9950"1
~overnber12,2002
RE: MWD Formation Evaluation Logs MPS-23,
AK-MW-22 108
1 LIS forma.tted Disc with verification listing,
API#: 50-029-23098-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd,
Anchorage, Alaska 99648
BP Exploration (Alaska) Inc,
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
Si~~
RECEIV'F~t1
_¡,~",l
No V 1 9 ()!~n')
L....l.~
Alaska Ot~ fJ (""n i'
I \.1 \J.:.!\.~ '-'O¡;R ('.--f'''m¡" .
"... ~iI:li 38100
Anctr0f8ge
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised 09/06/02, Start Production
)
')
1. Status of Well
B Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface r"""-......."....,c.".,.,',.c
3293' NSL 252' WEL SEC 12 T12N R10E UM ..~. COMPU:T::;~,.' '.,: ~. . "..-..,...,... .~I"..\.''''''''.\.'-.....
At top of productive i~tervai' , , J "1 ¡~~~ ~ '"LOCAYK)NS~
3427' NSL, 1809'WEL, SEC. 12, T12N, R10E, UM ~., -J~~-~ ~fjfDi
At total depth ~ ~¡rŒD'SU~¡;
592' NSL, 1582' WEL, SEC. 12, T12N, R10E, UM ¡ r,J~}"JJ-_... ~~.~J
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Seitat~..~~~
KBE = 67.1' ADL 380109
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
6-29-2002 7 -5-2002 7 -10-2002
17. Total Depth (MD+ TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey
8110 4189 FT 8110 4189 FT 0 Yes B No
22. Type Electric or Other Logs Run
MWD , GR , RES, ABI/IFR I CASANDRA
Classification of Service Well
7. Permit Number
202-132
8. API Number
50- 029-23098-00
9. Unit or Lease Name
Milne Point Unit
10. Well Number
MPS-23
11. Field and Pool
Milne Point Unit I Schrader Bluff
15. Water depth, if offshore 16. No. of Completions
Nt A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1800' (Approx.)
23.
CASING
SIZE
20"
7-5/8"
4-1/2"
WT. PER FT.
92#
29.7#
12.6#
GRADE
H-40
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
Surface 112' 42"
28' 5224' 9-7/8"
5126' 8104' 6-1/8"
CEMENTING RECORD
260 sx Arctic Set (Approx.)
1060 sx Class PF 'L', 280 sx Class 'G'
Uncemented Slotted Liner
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
25.
5230' - 81 02'
4224' - 4190'
26.
TUBING RECORD
SIZE DEPTH SET (MD)
4-1/2", 12.6#, L-80 4571'
3-1/2",9.2#, L-80 4571' - 4637'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 32 Bbls of Diesel
PACKER SET (MD)
4585'
MD
TVD
MD
TVD
27.
Date First Production
September 2, 2002
Date of Test Hours Tested
9/3/2002 6
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-BBL
TEST PERIOD 2057
OIL-BBL
GAs-McF
1051
GAs-McF
WATER-BBL
2712
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
511
OIL GRAVITY-API (CORR)
28.
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. SU~it~ titsV t D
SEP 1 0 2002
No core samples were taken.
~ ~:-;~k~' Üi~ & Ga,§ (,;íWG ;.~¡~~;.i¡;:-:\~iW
6,l1ett{j("~f.i~:'
Form 10-407 Rev. 07-01-80
1 ;'"
~ ¡;
':¡ i!
"\ , '"\
'! \
G (v
Submit In Duplicate
,~
)
)
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
SBF2-NA
4514'
40521
SBF1-NB
45561
4076'
SBE4-NC
4610'
41031
SBE2-NE
4636'
41141
SBE1-NF
47611
4159'
TSBD-OA
48541
4183'
TSBC
4961'
42031
TSBB-OB
51631
4220'
KECEtVt;,O
SEP 1 0 2002
~ k.~k~ Oii 8. GrJS Com; ~,ü~w¡\¡~~~~iO
~nehnfRnr
31. List of Attachments:
32. I hereby certify that the foregoing is true and cqrrect to the best of my knowledge
Signed Sandra ~~~&---litle Technical Assistant
MPS-23 202-132
Well Number Permit No. I Approval No.
Date CC1- cJq -DL
Prepared By Name/Number: Sondra Stewman, 564-4750
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Legal Name: MPS-23
Common Name: MPS-23
Test Date
7/4/2002
Test Type
FIT
Test Depth (TfJlD) ..- ::1"~U:!øptt1{1YÐ)....
5,264.0 (ft) 4,226.0 (ft)
- .
- .
-. - - --. -
- - - -- - - --
-~ ~,u~~~~~Jì~;- - -bM-~:~tm~:f!6J~:-9t~~-(@J1Pl ~
580 (psi) 2,556 (psi)
_EMVV. .
11.64 (ppg)
.. ~--.AMW-
9.00 (ppg)
.-
'-'
Printed: 7/1512002 8:50:23 AM
)
)
,. ,
I,
. ,
. :'11 ,:
I \I¡:,I"I:. " : I
.Q~rå~~Í1$$:~mørY$~"~ ..
,,' ',(:" " 1", .,' ~I 'j:1 ' "',: I 'II'" ",', '", ',' ",i' ",,' ;-," " ,'I'. I', ,.' 'I', 1< ",: ,1.1. ," ' " 'i',"" ,', , "" ,\. '",' 'I,
":1, I
. :" '~. I
" ::1/"
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-23
MPS-23
DRILL +COMPLETE
DOYON
DOYON 141
Start: 6/29/2002
Rig Release: 7/10/2002
Rig Number: 141
Spud Date: 6/29/2002
End: 7/10/2002
" " I.:, ,. £)e~grip~i()nofOper~tio'ns,',
' Date.' ',"From-To ' ;~OU~ ......"'a~3k, ,. qRqe'.N,r~r ' .: Phâs8'1.
": ,I I 1 ,I I ",' I', I ',""
. I I ., I I
6/29/2002 02:00 - 08:00 6.00 MOB P PRE MOVE RIG FROM MPS-11 TO MPS 23, RIG ACCEPT @
08:00 6/29/02
08:00 - 13:00 5.00 RIGU P PRE RIG UP DIVERTER, DIVERTER FUCTION TEST WAS
WITNESS BY JEFF JONES AOGC,
13:00 - 18:30 5.50 DRILL P INT1 PICKING UP 129 JTS 4" DRILL PIPE AND STAND IN
DERRICK,
18:30 - 19:00 0.50 DRILL P INT1 SERVICE TOP DRIVE
19:00 - 20:00 1.00 DRILL P INT1 CHANGE OUT SAVER SUB ON TOP DRIVE
20:00 - 22:30 2.50 DRILL P INT1 MAKING UP BHA #1, UPLOAD MWD, TEST MUD LINES
22:30 - 00:00 1.50 DRILL P INT1 SPUD WELL, DIRECTIONAL DRILL FROM 112 TO 258,
WITH 400 GALS MIN 1200 PSI 60 RPMS TQ 350
6/30/2002 00:00 - 00:30 0.50 DRILL P INT1 DIRECTIONAL DRILL FROM 258 TO 278, WITH 400 GALS
MIN 1200 PSI 60 RPMS TO 350
00:30 - 01 :00 0.50 DRILL P INT1 RIG UP AND RUN GYRO SURVEY ON WIRE LINE TO 175' .5
WITH 355 AZIM
01 :00 - 16:30 15.50 DRILL P INT1 DIRECTIONAL DRILL FROM 278 TO 2772', WITH 500
GALS MIN, 2200 PSI, 60 TO 80 RPMS, TQ 3,000, AST 3, ART
8
16:30 - 18:00 1.50 DRILL P INT1 CIRC THREE BOTTOMS UP,STANDING BACK ONE STAND
PER BOTTOMS, CIRC WITH 500 GALS MIN, 2200 PSI, 80
RPMS
18:00 - 20:00 2.00 DRILL P INT1 PUMPING OUT TO HWP WITH FULL DRILLING RATE
20:00 - 21 :30 1.50 DRILL P INT1 TRIP OUT WITH BHA
21 :30 - 22:30 1.00 DRILL P INT1 CUT DRILLING LINE 200 FT.
22:30 - 23:30 1.00 DRILL P INn TRIPPING IN WITH BIT #2, WASH 90 FT TO BOTTOM
23:30 - 00:00 0.50 DRILL P INT1 DIRECTIONAL DRILL FROM 2772' TO 2800', WITH 500
GALS MIN, 2400 PSI, 80 RPMS, TQ 4,000
7/112002 00:00 - 00:00 24.00 DRILL P INT1 DIRECTIONAL DRILL FROM 2800' TO 5165, WITH 500
GALS MIN, 3200 PSI, 80 RPMS, TO 6,000 AST 12.5 ART 4
7/2/2002 00:00 - 02:00 2.00 DRILL P INT1 DIRECTIONAL DRILL FROM 5165' TO 5234'.80 RPM 500
GPM 3200 PSI 23-35K WOB.
02:00 - 04:00 2.00 CASE P INT1 CIRCULATE AND CONDITION HOLE FOR TRIP. STAND
BACK ONE STAND EVERY BOTTOMS UP. CIRCULATED
3200 PSI 500 GPM 100 RPM.
04:00 - 08:30 4.50 CASE P INT1 PUMPED OUT TO HWDP WITH FULL DRILLING RATE.
08:30 - 11 :30 3.00 CASE P INT1 LAY DOWN BHA
11 :30 - 12:00 0.50 CASE P INT1 TRIPPING IN WITH 9 7/8 HOLE OPENER
12:00 - 12:30 0.50 CASE P INn SERVICE RIG
12:30 - 14:00 1.50 CASE P INT1 TRIP IN TO 3,500'
14:00 - 19:00 5.00 CASE P INT1 WASH AND REAM FROM 3,500 TO 5234 WITH HOLE
OPENER 530 GALS MIN 2200 PSI 150 RPMS TQ 5,000
19:00 - 22:00 3.00 CASE P INT1 CIRC THREE BOTTOMS UP WITH 530 GALS MIN. 2200 PSI
150 RPMS, SLUG PIPE
22:00 - 00:00 2.00 CASE P INT1 TRIPPING OUT FOR CSG ( NO PROBLEMS)
7/3/2002 00:00 - 01 :30 1.50 CASE P INT1 TRIPPING OUT FOR CSG, LAYING DOWN HWDP
01 :30 - 02:30 1.00 CASE P INT1 PJSM, RIG UP TO RUN 7.62529# L-80 CSG
02:30 - 07:30 5.00 CASE P INT1 RUNNING 7.62529# L-80 CSG TOAL 125 JTS
SHOE 5224, FLOAT 5138 STRING WT 100,000
07:30 - 08:00 0.50 CEMT P INT1 RIG DOWN FRANKS TOOL, RIG UP CEMENT HEAD
08:00 - 10:30 2.50 CEMT P INT1 CIRC, THIN MUD FOR CEMENT JOB
10:30 - 14:00 3.50 CEMT P INT1 CEMENT, PUMPED 1060 SX L MIXED @ 10.7, 783 BBLS
SLURRY MIXED @ 6.5 BBlS MIN, TAILED 280 SXS CLASS
G MIXED 15.857 BBLS SLURRY, MIXED 5.5 BBLS MIN.
Printed: 7/1512002 8:52:06 AM
)
')
1'1',
',1,1
" '
,
,taft ,,'.'
I I I I I ':,1 I
...øþ~r~~~~.~.$~.,.~~~~~~~.'..."
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
:: I I
MPS-23
MPS-23
DRILL +COMPLETE
DOYON
DOYON 141
Start: 6/29/2002
Rig Release: 7/10/2002
Rig Number: 141
Spud Date: 6/29/2002
End: 7/10/2002
. I ',II, "'1: ,II I I I "I"
,'Q~t~. ',F:fåm,~TQ'.' HC)~fs;.:(task ,Códê ,.~.iPT . Pha$e,.
;' " I 'I ,I' ',', " I .': ' \ :.,': "I"" "", I,,' "
7/3/2002
7/4/2002
7/5/2002
7/6/2002
10:30 - 14:00
14:00 - 15:00
15:00 -18:00
18:00 -18:30
18:30 - 21 :00
21 :00 - 00:00
00:00 - 01 :30
01 :30 - 04:00
04:00 - 05:30
05:30 - 06:00
06:00 - 07:00
07:00 - 08:30
08:30 - 09:30
09:30 - 1 0:00
10:00 - 11 :00
11 :00 - 11 :30
11 :30 - 12:30
12:30 - 00:00
00:00 - 18:00
18:00 - 20:00
20:00 - 22:30
22:30 - 23:30
23:30 - 00:00
00:00 - 02:00
02:00 - 04:30
04:30 - 06:00
06:00 - 08:00
08:00 - 11 :30
11 :30 -13:30
13:30 - 14:30
3.50 CEMT P
INT1
1.00 CEMT P
3.00 CASE P
0.50 CASE P
2.50 CASE P
3.00 CASE P
INT1
INT1
INT1
INT1
INT1
1.50 CASE P
2.50 CASE P
INT1
INT1
1.50 CASE P
0.50 CASE P
1.00 CASE P
1.50 CASE P
INT1
INn
INT1
INT1
1.00 CASE
0.50 CASE
1.00 CASE
0.50 DRILL
1.00 DRILL
11.50 DRILL
P
P
P
P
P
P
INT1
INT1
INT1
PROD1
PROD1
PROD1
18.00 DRILL P
PROD1
2.00 CASE P
COMP
2.50 CASE P
COMP
1.00 CASE P
0.50 CASE P
COMP
COMP
2.00 CASE P
COMP
2.50 CASE P
CaMP
1.50 CASE P
2.00 CASE P
3.50 CASE P
COMP
COMP
COMP
2.00 CASE P
1.00 CASE P
COMP
COMP
',ÐesÞriptiQdbfQp~r~dions ,,'
,,:, 1,."," ,II".",;,,:' ',' "",,' ,,: ,', ','" L, ",
DISPLACE WITH 9.2 MUD 6 BBLS MIN. BUMP PLUG WITH
1700 PSI, FULL RETURNS TRU OUT JOB, 320 BBLS OF
GOOD CEMENT TO SURFACE. CIP@ 13:55 HRS 7/3/2002
RIG DOWN LANDING JT AND CEMENT HEAD
NIPPLE DOWN DIVERTER
NIPPLE UP FMC GEN. 6 HEAD AND TEST 1000#
NIPPLE UP 13 5/8 5000# BOPS
TEST BOPS 250 LOW, 4000 HIGH, ANNULAR 250/2500
WITNESS OF BOP TEST WAS WAVIER BY JEFF JONES
AOGC 19:15 HRS 7/2/2002
TESTING BOPS, INSTALL WEAR RING
PICKING UP BHA 6.125 2643 SEC. ,4 3/4 SERRYDRILL 1.5
BEND, 4 3/4 SP4 RES/GRAMMAlDM,HANG OFF SUB,3 FLEX
COLLARS,JARS,XO
TRIPPING IN TO 5100
CIRC.
TEST CSG TO 4,000# FOR 30 MIN.
DRILL CEMENT FLOAT AND SHOE AND 30 FT NEW HOLE
TO 5264
CIRC BOTTOMS UP
FIT TEST WITH 580 PSI 9.0 MUD WT. 4226 lVD= 11.6 EMW
DISPLACE WELL WITH 9.1 FLO-PRO MUD
DIRECTIONAL DRILL 5264 TO 5277 BIT TRYING TO PLUG
CLEAN PUMP SUCTIONS OF GRAVEL
DIRECTIONAL DRILL 5277 TO 6326 WITH 250 GALS MIN.
1700 PSI 1 0,000 BIT WT. 75 RPMS TO 5,000 AST 3.5 ART
4.25
DIRECTIONAL DRILL 6326 TO TD @ 8110 WITH 250 GALS
MIN. 2000 PSI 1 0,000 BIT WT. 75 RPMS TO 5,000 AST2.5
ART 8 CROSS FAULT @ 7,695 LEFT SAND WENT INTO
SHALE, WENT TO 100 DEGREES FOUND SAND @ 7850
CIRC THREE BOTTOMS UP WITH 280 GALS MIN, 2200 PSI,
100 RPMS
PUMPING OUT TO CSG SHOE @ 5224 WITH FULL
DRILLING RATE, MAKING SHORT TRIP DUE TO SHALE IN
WELL BORE
TRIP BACK TO BOTTOM (NO PROBLEMS)
CIRC THREE BOTTOMS UP WITH 280 GALS MIN, 2200 PSI,
100 RPMS
CIRC THREE BOTTOMS UP, WITH 280 GALS MIN., 2200
PSI 1 00 RPMS, SPOT NEW MUD TO BIT
PUMPING UP INTO CSG @ 5224 DISPLACING HOLE WITH
NEW MUD
MONITOR WELL, SLUG PIPE, TRIPPING OUT FOR LINER
LAY DOWN BHA
PICK UP LINER, 4.512.6#,L-80,IBT- 98 JTS SLOTTED, TWO
JTS SOLID, BAKER HMC LINER HANGER, BAKER ZXP
LINER TOP PACKER, WITH TWO CENTRALIZERS PER JT
ON SLOTTED
TRIP IN HOLE WITH LINER ( NO PROBLEMS)
DROP BALL AND SET LINER PACKER AND HANGER
LINER TOP @ 5125.98 SHOE @ 8103.49
Printed: 7/1512002 8:52:06 AM
")
)
'I' I
I 'II
, ;, I" I .
..,8P,.
... OP~"'~";$b~riI.~fi~Pørt ...
" :;""¡,,.,,' ":" :',/L'''''''''I''''''''':,'''','',",'~I'I''I':'I'''' "",:':"':<""">'' ;"", "I:"i"':,"<"~'''''(''':''I'' I '.':"':": ': ""':",,;:,,:,
Legal Well Name: MPS-23
Common Well Name: MPS-23
Event Name: DRILL +COMPLETE
Contractor Name: DOYON
Rig Name: DOYON 141
. I " J I L I I II II 'I' 1'11.1' I I I ' 'I" I ,I I I',. I'r "
. . "þ,ate,.':,I ., }~~tpt'1;1~:Td, ,.HÇUrs:':Tå~k':.,C9d~ "NPT.':'f?ha$è'
,'I " "I '1",,1,'1 ' ',"1""" I ':",1," "',1' ",II, I" ", I'
7/6/2002 14:30 - 15:30 1.00 CASE P
15:30 - 17:30 2.00 CASE P
17:30 - 20:30 3.00 STWHIP P
20:30 - 22:30 2.00 STWHIP P
22:30 - 23:00 0.50 STWHIP P
23:00 - 00:00 1.00 STWHIP P
7/7/2002 00:00 - 02:30 2.50 STWHIP P
02:30 - 04:00 1.50 STWHIP P
04:00 - 06:30 2.50 STWHIP P
06:30 - 07:00 0.50 STWHIP P
07:00 - 10:30 3.50 STWHIP P
COMP
COMP
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
7/8/2002
10:30 - 00:00 13.50 DRILL P
00:00 - 17:00 17.00 DRILL P
17:00 - 18:00 1.00 CASE P
18:00 - 19:00 1.00 CASE P
19:00 - 21 :00 2.00 CASE P
21 :00 - 00:00 3.00 CASE P
00:00 - 00:30 0.50 CASE P
00:30 - 02:30 2.00 CASE P
02:30 - 03:30 1.00 CASE P
03:30 - 05:30 2.00 CASE P
05:30 - 06:00 0.50 CASE P
06:00 - 08:00 2.00 CASE P
08:00 - 10:30 2.50 CASE P
10:30 - 11 :00 0.50 CASE P
11 :00 - 14:30 3.50 CASE P
14:30 - 16:30 2.00 CASE P
16:30 - 18:00 1.50 CASE P
PROD2
PROD2
COMP
COMP
COMP
COMP
7/9/2002
COMP
COMP
COMP
COMP
COMP
CaMP
COMP
COMP
COMP
COMP
COMP
Start: 6/29/2002
Rig Release: 7/10/2002
Rig Number: 141
Spud Date: 6/29/2002
End: 7/10/2002
,'.
.'.
,,' I I I I. I I I I I I . I
:. "Øesâtiption'.()f(~perat¡()ns
L I : I I I ~ I I ¡""I' I ¡" I" ' I I " I I ' ",,'': II' ' ' . I I
PULL ONE STAND, CUT DRILLING LINE
TRIPPING OUT WITH RUNNING TOOL AND LAY DOWN
RUNNING TOOL
PICK UP 258.19 FT OF 3.5 TAIL PIPE AND WHIPSTOCK
AND MILLS AND BHA
TRIPPING IN HOLE WITH WHIP STOCK
ORIENT AND SET WHIPSTOCK @ 4859 10 DEGREE TO
THE LEFT OF HIGH SIDE AND SHEAR OFF
(TOP OF OA SAND 4856)
MILLING WINDOW @ 4859 TO 4866 WITH 270 GALS MIN
1400 PSI,50 RPMS 1- 4,000 BIT WT.
MILLING WINDOW @ 4866 TO 4890 WITH 270 GALS MIN
1400 PSI, 70 RPMS 1- 4,000 BIT WT
TOP OF WINDOW 4859 BOTTOM 4871
CIRC, WORK WINDOW, PUMP HIGH VIS PILL
TRIPPING OUT FOR BHA
FLUSH BOPS WITH JOHNNY WHACKER
PICK UP BHA TRIP INTO TOP OF WHIPSTOCK, ORIENT
AND WENT THRU WINDOW @ 4859, WASH AND REAMED
TO 4890
DIRECTIONAL DRILL 4890 TO 6463 WITH 80 RPMS, 250
GPM, 1650 PSI
DIRECTIONAL DRILL 6463 TO TD @ 8082 WITH 80 RPMS,
250 GPM, 1650 PSI AST 4 ART 7.25
CIRC ONE BOTTOMS WITH 100 RPMS 280 GPM 2000 PSI
SIX STAND SHORT TRIP, PUMPING OUT WITH FULL
DRILLING RATE, NO PROBLEMS
CIRC THREE BOTTOMS UP WITH 100 RPMS 280 GPM 2000
PSI
PUMPING OUT TO WINDOW @ 4859, DISPLACING HOLE
WITH NEW MUD
CON'T PUMP OUT TO 4950' - PULL WITHOUT PUMP ONE
STAND INTO CASING @ 4857'
OBSERVE WELL - PUMP DRY JOB - PULL OUT OF HOLE
LD BHA - DOWNLOAD MWD
MU BAKER RETRIEVING ASSEMBLY - RIH TO 4859' WITH
RETRIEVING TOOL
LATCH - RETRIEVE WHIPSTOCK
OBSERVE WELL - PUMP DRY JOB - POH WITH
WHIPSTOCK
LD BAKER WHIPSTOCK - SPACER DRILL PIPE - BAKER
RETRIEVING ASSEMBLY
CLEAR FLOOR - RIG UP TO RUN 4.5" SLOTTED LINER
PU 90 JOINTS 4.5" SLOTTED LINER - BAKER HOOK WALL
HANGER ASSEMBLY - TOTAL FOOTAGE RAN 3172' - RIG
DOWN CASING RUNNING TOOLS - CLEAR FLOOR
RIH WITH LINER TO WINDOW - ORIENT - EXIT WINDOW
ON 2ND ATTEMPT
CON'T RIH WITH LINER - HOOK WALL HANGER SET
DOWN ON WINDOW 10' HIGH - WORK LINER TO GET
HANGER THROUGH WINDOW - WORK UNTIL LINER
HANGER PASSED WINDOW TO 4881' - ORIENT HANGER
AND HANG AT 4871' - SLACK OFF 35K ON HOOK - PUMP
Printed: 7/1512002 8:52:06 AM
)
)
~ I l "
I: ,0,:1,
BP,.,. ,
.. \~tffl!~~i~~~'.~~~~~(~~~~#;...' ...
"
'i
" ,
Legal Well Name: MPS-23
Common Well Name: MPS-23
Event Name: DRILL +COMPLETE
Contractor Name: DOYON
Rig Name: DOYON 141
, ",,:',' ':1",11" I I '11',1 'I I ',' ,I II I I
., D~Ì(i~:' ,II, ' , Fråm;Ä7[o:',H.()ûrs' .'.., Tåsk ; . GQð~' ':~'p~,
" I .1,' " ,: I ;' I, I ' 'I, '., ',."' I. I I I I" ,:., I ",'" .' . " I I I I r' ,.. I I', . . PI, ,: i ' I . I ::.' '. .: ,I. 'I, .' , I ' I " I~' " '. I" : " I" I I " '': I I I I I I '. " I I ','
7/9/2002
16:30 - 18:00
18:00 - 21 :00
21 :00 - 21 :30
21 :30 - 23:30
23:30 - 00:00
7/10/2002
00:00 - 02:30
02:30 - 03:00
03:00 - 05:00
05:00 - 05:30
05:30 - 06:30
06:30 - 14:00
1.50 CASE P
3.00 CASE P
0.50 CASE P
2.00 RUNCOfvP
0.50 RUNCOfvP
2.50 RUNCOrvP
0.50 RUNCOrvP
2.00 RUNCOrvP
0.50 RUNCO~P
1.00 RUNCOrvP
7.50 RUNCOrvP
Spud Date: 6/29/2002
End: 7/10/2002
Start: 6/29/2002
Rig Release: 7/10/2002
Rig Number: 141
'Rhåsé, ." . 'bès'c,'fiP'ì. iO, 'n,':o,fOP' er~ti, QOS ,: ,
" . ,',', I " I . I I : /'."':,,' ,.,' I II' I I I I' , I' I
1"1, ","~ '1'1'"",... 1":,",'1,': ',",": 'I'," ',1'1',' 'r 'I""":'" ':. I
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
COMP
14:00 - 15:00 1.00 BOPSUR.P COMP
15:00 - 17:00 2.00 WHSUR P COMP
17:00 - 20:30 3.50 RIGD P COMP
20:30 - 22:00 1.50 RIGD P COMP
22:00 - 00:00
2.00 RIGD P
COMP
BAll TO SEAT - PRESSURE UP TO 2800 - RELEASE HR
TOOL - PU CHECK WEIGHT LOSS (20K) - BLOW BALL
SEAT 4200 - PU PULL TORQUE TUBE - PUMP DRY JOB
POH - LD 4" DRILL PIPE - STANDING BACK 51 STANDS IN
DERRICK
LD LINER RUNNING TOOL - CLEAR FLOOR
RIH TO 4770'
BREAK CIRC - CIRCULATE - RIG UP TO DISPLACE WELL
TO 9.2 BRINE
DISPLACE WELL TO 8.8 SEAWATER - FLUSH KILL LINE
WITH 8.8 SEAWATER - PUMP HI VIS SPACER -
FOLLOWED BY 200 BBlS 8.8 SEAWATER - FOLLOWED BY
220 BBlS 9.2 BRINE - 420 GPM - 120 RPM
OBSERVE WELL - WELL STATIC
lD 4" DRill PIPE
PUll WEAR RING
RIG UP COMPLETION RUNNING EQUIPMENT - PJSM
PU 112 JTS 4.5" TUBING PLUS COMPLETION ASSEMBLIES
- MAKE UP TUBING HANGER WITH lWC INSTALLED -
INSTALL CONTROL LINE -LAND TUBING - RUN IN LDS-
BACK OUT LANDING JOINT - TEST lWC TO 1000 PSI
NIPPLE DOWN BOP'S
NIPPLE UP FMC TUBING HEAD ADAPTER - TEST PACK
OFF & VOIDS TO 5K - ALL TEST WERE GOOD - NU CIW 4
1/16" TREE - TEST WITH HB&R TO 5K - OK
CIRCULATE WELL FLUID TO 110 DEGREE GOING IN AND
100 DEGREE OUT WITH HB&R
DROP BALL - PRESSURE UP TO 4000 PSI TO SET PACKER
- HOLD / RECORD FOR 30 MINS - BLEED OFF TUBING
PRESSURE TO 2500 PSI - PRESSURE UP ON ANNULUS
TO 4500 PSI - HOLD / RECORD FOR 30 MINS - BLEED OFF
TUBING TO 2200 PSI - RP VALVE SHEARED OUT - BLEED
OFF PRESSURE ON TUBING / ANNULUS
DISPLACE WELL WITH 32 BBLS DIESEL DOWN ANNULUS -
U-TUBE FOR FREEZE PROTECTION -INSTALL BPV-
SECURE WELL - RELEASE RIG @ 23:59 HRS
Printed: 7/1512002 8:52:06 AM
'\
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-23
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
'MD
, M D (if applicable)
8,110.00' MD
)
a Od / 301..
30-Jul-02
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
AUG 0 1 2002
Alaska Oil & Gas Cons. Coßlß1Î8lOn
Anchorage
Milne Point Unit
BPXA
Milne Point MPS, Slot MPS-23
MPS-23
Job No. AKZZ22108, Surveyed: 8 July, 2002
ð~~
~-IA .
'lJ)~
."1:
BP EXPLORA T/ON (ALASKA) INC.
-..'
SURVEY REPORT
22 July, 2002
Your Ref: API 500292309800
Surface Coordinates: 5999959.54 N, 565758.11 E (70024' 37.1981" H, 149027' 52.3786" W)
Kelly Bushing: 67. 10ft above Mean Sea Level
~~"'
spel'l'Y-SUI!
DRILLING SERVices
A Halliburton Company
5U1vey Ref: 5vy10136
Sperry-Sun Drilling Services () .
Survey Report for MPS-23 ~~ q)~
Your Ref: API 500292309800
Job No. AKZZ22108, Surveyed: 8 July, 2002
BP EXPLORATION (ALASKA) INC. . I~ BPXA
Milne Point Unit e Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
0.00 0.000 0.000 -67.1 0 0.00 0.00 N O.OOE 5999959.54 N 565758.11 E 0.00 Tolerable Gyro
175.00 0.500 324.000 107.90 175.00 0.62 N 0.45W 5999960.15 N 565757.66 E 0.286 -0.35 AK-6 BP _IFR-AK
295.91 0.910 15.480 228.80 295.90 1.97 N 0.50W 5999961.51 N 565757.59 E 0.591 -1.53 ~~
384.24 0.120 4.140 317.13 384.23 2.74 N 0.31 W 5999962.28 N 565757.78 E 0.897 -2.31
472.78 0.170 252.360 405.67 472.77 2.79 N 0.43 W 5999962.33 N 565757.66 E 0.273 -2.30
562.82 0.140 232.230 495.70 562.80 2.68 N O.64W 5999962.22 N 565757.44 E 0.069 -2.11
654.14 0.220 219.640 587.02 654.12 2.48 N O.84W 5999962.01 N 565757.25 E 0.097 -1.83
746.04 0.250 216.050 678.92 746.02 2.18 N 1.07W 5999961.71 N 565757.02 E 0.036 -1.46
840.01 0.630 209.330 772.89 839.99 1.57 N 1.45 W 5999961.09 N 565756.65 E 0.407 -0.75
934.28 0.960 208.410 867.15 934.25 0.42 N 2.08W 5999959.94 N 565756.03 E 0.350 0.56
1027.66 0.330 43.930 960.53 1027.63 0.088 2.26W 5999959.44 N 565755.85 E 1.372 1.09
1120.67 0.550 51.610 1053.54 1120.64 0.39 N 1.73W 5999959.92 N 565756.38 E 0.244 0.42
1213.93 0.840 54.980 1146.79 1213.89 1.07 N 0.81 W 5999960.60 N 565757.29 E 0.314 -0.58
1307.31 1.440 16.510 1240.15 1307.25 2.58 N 0.08E 5999962.12 N 565758.17 E 1.007 -2.34
1401.10 4.020 348.600 1333.83 1400.93 6.94 N 0.24W 5999966.4 7 N 565757.81 E 3.016 -6.09
1494.56 3.890 335.230 1427.07 1494.17 13.03 N 2.21 W 5999972.55 N 565755.78 E 0.994 -10.63
1587.80 4.620 307.150 1520.06 1587.16 18.17 N 6.53W 5999977.65 N 565751.42 E 2.339 -13.28
1681.47 5.240 303.540 1613.38 1680.48 22.81 N 13.10 W 5999982.23 N 565744.81 E 0.740 -14.46
1775.35 5.430 318.290 1706.86 1773.96 28.49 N 19.63 W 5999987.86 N 565738.23 E 1.471 -16.59
1868.80 5.530 319.730 1799.88 1866.98 35.23 N 25.48 W 5999994.54 N 565732.32 E 0.182 -19.97 --
1962.18 5.820 321.980 1892.81 1959.91 42.39 N 31.31 W 6000001.65 N 565726.43 E 0.391 -23.74
2055.35 7.270 321.450 1985.37 2052.47 50.72 N 37.89 W 6000009.93 N 565719.77 E 1.558 -28.21
2148.49 11.540 320.000 2077.23 2144.33 62.48 N 47.56 W 6000021.59 N 565710.00 E 4.591 -34.35
2242.18 16.850 320.820 2168.03 2235.13 80.19 N 62.17 W 6000039.18 N 565695.24 E 5.672 -43.58
2335.61 21.720 321.930 2256.19 2323.29 104.31 N 81.40 W 6000063.13 N 565675.80 E 5.227 -56.45
2428.77 24.400 322.820 2341.90 2409.00 133.22 N 103.66 W 6000091.84 N 565653.28 E 2.901 -72.23
2523.29 29.400 321.660 2426.17 2493.27 167.00 N 129.87 W 6000125.39 N 565626.78 E 5.319 -90.57
2616.90 33.550 321.380 2505.99 2573.09 205.24 N 160.28 W 6000163.36 N 565596.03 E 4.436 -111.01
2709.95 36.970 320.660 2581.96 2649.06 246.99 N 194.07 W 6000204.81 N 565561.87 E 3.702 -133.05
2799.73 34.970 320.970 2654.61 2721.71 287.86 N 227.39 W 6000245.38 N 565528.19 E 2.237 -154.53
-------------- -----_.-
22 July, 2002 - 14:15
Page 20'6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report for MPS-23 Ds~
Your Ref: API 500292309800
Job No. AKZZ2210B, Surveyed: B July, 2002
BP EXPLORATION (ALASKA) INC. W~~ BPXA
Milne Point Unit ~oint MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
2893.38 32.610 319.580 2732.44 2799.54 327.92 N 260.66 W 6000285.15 N 565494.57 E 2.652 -175.30
2986.70 33.560 319.960 2810.63 2877.73 366.81 N 293.56 W 6000323.75 N 565461.33 E 1.042 -195.20
3080.43 35.140 320.030 2888.01 2955.11 407.32 N 327.56 W 6000363.96 N 565426.98 E 1.686 -216.05
3173.36 35.900 319.710 2963.65 3030.75 448.60 N 362.36 W 6000404.94 N 565391.82 E 0.842 -237.22
3266.63 37.110 319.380 3038.62 3105.72 490.82 N 398.36 W 6000446.83 N 565355.45 E 1.314 -258.69
3360.46 33.860 317.650 3115.01 3182.11 531.64 N 434.41 W 6000487.33 N 565319.04 E 3.625 -278.89
3453.84 33.650 316.120 3192.65 3259.75 569.51 N 469.86 W 6000524.89 N 565283.25 E 0.938 -296.72
3547.11 33.060 311.380 3270.57 3337.67 604.96 N 506.87 W 6000560.01 N 565245.93 E 2.864 -311.70
3640.38 33.530 299.890 3348.61 3415.71 634.64 N 548.34 W 6000589.33 N 565204.21 E 6.773 -319.51
3733.93 35.150 290.870 3425.90 3493.00 657.13 N 595.93 W 6000611.40 N 565156.41 E 5.703 -318.14
3827.26 37.380 283.340 3501.18 3568.28 673.25 N 648.64 W 6000627.05 N 565103.57 E 5.333 -308.78
3920.09 40.410 276.780 3573.46 3640.56 683.31 N 705.97 W 6000636.61 N 565046.15 E 5.505 -291.93
4013.77 40.380 265.150 3644.91 3712.01 684.33 N 766.45 W 6000637.09 N 564985.67 E 8.037 -265.60
4107.22 41.870 253.460 3715.40 3782.50 672.87 N 826.60 W 6000625.11 N 564925.62 E 8.371 -228.27
4200.88 45.630 248.030 3783.07 3850.17 651.44 N 887.65 W 6000603.14 N 564864.76 E 5.671 -181.62
4294.70 48.490 244.000 3846.99 3914.09 623.48 N 950.35 W 6000574.63 N 564802.31 E 4.379 -128.41
4388.08 49.630 243.970 3908.18 3975.28 592.54 N 1013.74 W 6000543.13 N 564739.19 E 1.221 -72.23
4480.91 52.390 241.700 3966.59 4033.69 559.58 N 1077.91 W 6000509.61 N 564675.32 E 3.528 -13.90
4574.51 58.840 237.300 4019.44 4086.54 520.32 N 1144.34 W 6000469.76 N 564609.23 E 7.905 51.09
4667.89 67.590 232.120 4061.50 4128.60 472.11 N 1212.20 W 6000420.96 N 564541.80 E 10.594 124.71
4'(61.53 73.980 229.690 4092.31 4159.41 416.35 N 1280.76 W 6000364.60 N 5644 73. 73 E 7.250 205.37
4854.77 76.650 228.080 4115.94 4183.04 357.05 N 1348.70 W 6000304.70 N 564406.32 E 3.315 288.93
4942.95 79.290 224.410 4134.33 4201.43 297.41 N 1410.97 W 6000244.51 N 564344.58 E 5.053 370.22
5037.31 88.090 223.320 4144.69 4211.79 2~9.85 N 1475.89 W 6000176.39 N 564280.26 E 9.396 459.79
5"135.61 85.200 218.970 4150.44 4217.54 155.98 N 1540.44 W 6000101.95 N 564216.36 E 5.306 554.82
5169.65 83.780 217.340 4153.71 4220.81 129.34 N 1561.37 W 6000075.13 N 564195.66 E 6.334 588.03
5275.27 90.250 215.290 4159.21 4226.31 44.40 N 1623.79 W 5999989.64 N 564133.99 E 6.425 691.99
5323.14 91.790 208.970 4158.35 4225.45 3.89 N 1649.24 W 5999948.91 N 564108.90 E 13.586 739.62
5368.64 92.090 202.580 4156.81 4223.91 37.04 S 1669.00 W 5999907.81 N 564089.50 E 14.051 785.06
5419.15 90.490 196.580 4155.67 4222.77 84.59 S 1685.91 W 5999860.11 N 564073.01 E 12.291 835.14
- ---- -~-------~--~--
---- ---.--- --
22 July, 2002 - 14:15
Page 3 of6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services D.. .
Survey Report for MPS-23 ~~~
Your Ref: API 500292309800
Job No. AKZZ22108, Surveyed: 8 July, 2002
BP EXPLORATION (ALASKA) INC. r~t{in~=~~
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
5462.01 89.450 194.120 4155.70 4222.80 125.92 S 1697.26 W 5999818.68 N 564062.03 E 6.231 877.14
5507.46 90.490 188.090 4155.72 4222.82 170.50 S 1706.01 W 5999774.03 N 564053.67 E 13.463 920.88
5555.74 90.980 180.750 4155.10 4222.20 218.60 S 1709.73 W 5999725.90 N 564050.38 E 15.236 965.50
5605.09 92.280 179.120 4153.70 4220.80 267.93 S 1709.67 W 5999676.57 N 564050.87 E 4.224 1009.51
5649.47 92.650 179.420 4151.79 4218.89 312.26 S 1709.10 W 5999632.24 N 564051.82 E 1.073 1048.83
5698.45 92.580 178.900 4149.55 4216.65 361.198 1708.39 W 5999583.33 N 564052.97 E 1.070 1092.19
5742.33 94.370 178.580 4146.89 4213.99 404.97 S 1707.42 W 5999539.55 N 564054.32 E 4.144 1130.84
5789.80 92.830 177.940 4143.91 4211.01 452.33 8 1705.99 W 5999492.21 N 564056.17 E 3.512 1172.47
5835.48 89.690 177.110 4142.91 4210.01 497.95 S 1704.01 W 5999446.61 N 564058.55 E 7.110 1212.31
5883.60 89.940 176.850 4143.06 4210.16 546.00 S 1701.48 W 5999398.58 N 564061.50 E 0.750 1254.06
5929.48 90.490 176.360 4142.89 4209.99 591.80 8 1698.76 W 5999352.81 N 564064.62 E 1.606 1293.73
5976.87 89.940 176.550 4142.71 4209.81 639.108 1695.83 W 5999305.54 N 564067.97 E 1.228 1334.63
6023.18 89.880 181.090 4142.79 4209.89 685.38 S 1694.88 W 5999259.26 N 564069.33 E 9.804 1375.53
6072.67 89.690 180.960 4142.97 4210.07 734.87 S 1695.76 W 5999209.77 N 564068.88 E 0.465 1420.10
6115.87 88.710 179.530 4143.58 4210.68 778.06 S 1695.95 W 5999166.58 N 564069.08 E 4.013 1458.74
6165.86 88.770 182.620 4144.68 4211.78 828.02 S 1696.89 W 5999116.61 N 564068.58 E 6.181 1503.77
6209.15 91.600 183.920 4144.54 4211.64 871.24 S 1699.35 W 5999073.38 N 564066.49 E 7.194 1543.46
6258.36 91.850 183.110 4143.05 4210.15 920.33 S 1702.37 W 5999024.26 N 564063.91 E 1.722 1588.65
6303.61 89.940 184.540 4142.35 4209.45 965.47 8 1705.39 W 5998979.09 N 564061.29 E 5.273 1630.31
6352.40 89.320 184.000 4142.66 4209.76 1014.128 1709.02 W 5998930.41 N 564058.08 E 1.685 1675.38
6397.03 90.250 183.320 4142.83 4209.93 1058.66 S 1711.87 W 5998885.85 N 564055.63 E 2.581 1716.42
6446.91 90.620 183.540 4142.45 4209.55 1108.458 1714.85 W 5998836.03 N 564053.08 E 0.863 1762.22
6490.47 90.060 183.420 4142.19 4209.29 1151.938 1717.50 W 5998792.53 N 564050.82 E 1.315 1802.22
6538.12 89.880 184.590 4142.22 4209.32 1199.46 S 1720.83 W 5998744.97 N 564047.91 E 2.484 1846.16
6584.23 90.310 184.760 4142.14 4209.24 1245.42 S 1724.58 W 5998698.98 N 564044.56 E 1.003 1888.88
6633.86 90.060 185.310 4141.98 4209.08 1294.86 S 1728.94 W 5998649.51 N 564040.64 E 1.217 1934.98
6677.15 90.180 186.110 4141.89 4208.99 1337.93 S 1733.25 W 5998606.40 N 564036.71 E 1.869 1975.37
6724.81 91.110 181.630 4141.35 4208.45 1385.47 S 1736.46 W 5998558.84 N 564033.91 E 9.600 2019.26
6770.59 90.550 176.490 4140.69 4207.79 1431.22 S 1735.71 W 5998513.09 N 564035.07 E 11.293 2059.77
6812.62 90.250 173.110 4140.40 4207.50 1473.078 1731.90 W 5998471.28 N 564039.24 E 8.073 2095.41
------ -~- .---
22 July, 2002 - 14:15
Page 4 0'6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services DS .
.~~.
Survey Report for MPS-23
Your Ref: API 500292309800
Job No. AKZZ22108, Surveyed: 8 July, 2002 rJìþs
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (° /1 OOft)
6863.97 88.220 167.590 4141.08 4208.18 1523.67 S 1723.30 W 5998420.76 N 564048.29 E 11 .452 2136.70
6915.75 86.120 167.910 4143.64 4210.74 1574.20 S 1712.33 W 5998370.32 N 564059.71 E 4.102 2176.88
6957.79 85.930 168.380 4146.55 4213.65 1615.25 S 1703.71 W 5998329.35 N 564068.68 E 1.203 2209.64 -"
7006.45 88.150 167.620 4149.07 4216.17 1662.78 S 1693.61 W 5998281.91 N 564079.21 E 4.822 2247.52
7051.11 89.510 167.670 4149.98 4217.08 1706.39 S 1684.06 W 5998238.39 N 564089.14 E 3.047 2282.15
7099.46 89.450 167.060 4150.42 4217.52 1753.57 S 1673.48 W 5998191.30 N 564100.13 E 1.268 2319.50
7144.70 90.000 167.780 4150.63 4217.73 1797.72 S 1663.63 W 5998147.24 N 564110.38 E 2.003 2354.48
7193.97 88.830 163.420 4151.14 4218.24 1845.43 S 1651.38 W 5998099.64 N 564123.04 E 9.162 2391.55
7237.92 88.830 162.830 4152.03 4219.13 1887.48 S 1638.62 W 5998057.71 N 564136.17 E 1.342 2423.34
7286.66 86.980 162.450 4153.82 4220.92 1933.97 S 1624.09 W 5998011.35 N 564151.11 E 3.875 2458.30
7331.49 86.550 162.680 4156.35 4223.45 1976.67 S 1610.68 W 5997968.77 N 564164.90 E 1.087 2490.37
7380.49 87.600 161.230 4158.85 4225.95 2023.20 S 1595.52 W 5997922.38 N 564180.46 E 3.650 2525.08
7424.77 89.020 160.540 4160.15 4227.25 2065.01 S 1581.03 W 5997880.69 N 564195.32 E 3.565 2555.89
7473.38 89.380 160.390 4160.83 4227.93 2110.82 S 1564.78 W 5997835.02 N 564211.98 E 0.802 2589.46
7517.24 90.860 160.390 4160.74 4227.84 2152.14 S 1550.06 W 5997793.84 N 564227.06 E 3.374 2619.71
7565.51 91.170 159.230 4159.88 4226.98 2197.43 S 1533.40 W 5997748.69 N 564244.12 E 2.487 2652.64
7610.51 91.050 158.830 4159.01 4226.11 2239.44 S 1517.30 W 5997706.82 N 564260.59 E 0.928 2682.89
7660.62 90.920 158.390 4158.15 4225.25 2286.10 S 1499.02 W 5997660.33 N 564279.27 E 0.915 2716.31
7701.20 93.510 158.420 4156.58 4223.68 2323.80 S 1484.10W 5997622.77 N 564294.53 E 6.383 2743.24
7757.78 94.000 158.720 4152.88 4219.98 2376.35 S 1463.47 W 5997570.40 N 564315.62 E 1.015 2780.86
7796.38 98.760 157.680 4148.59 4215.69 2411.96 S 1449.23 W 5997534.92 N 564330.17 E 12.619 2806.23
7835.42 98.4 70 158.420 4142.74 4209.84 2447.76 S 1434.81 W 5997499.24 N 564344.91 E 2.016 2831.70
7890.92 100.100 157.620 4133.79 4200.89 2498.55 S 1414.31 W 5997448.64 N 564365.86 E 3.263 2867.80
7940.34 93.450 156.690 4127.96 4195.06 2543.75 S 1395.26 W 5997403.61 N 564385.30 E 13.585 2899.57
7983.33 91.720 157.760 4126.02 4193.12 2583.34 S 1378.64 W 5997364.16 N 564402.27 E 4.730 2927.43
8040.02 91.660 157.590 4124.35 4191.45 2635.76 S 1357.11 W 5997311.93 N 564424.26 E 0.318 2964.53
8110.00 91.660 157.590 4122.32 4189.42 2700.43 S 1330.45 W 5997247.50 N 564451.49 E 0.000 3010.24 Projected Survey
-------~~-
------.---- ----
22 July, 2002 - 14:15
Page 50'6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for MPS-23
Your Ref: API 500292309800
Job No. AKZZ2210B, Surveyed: B July, 2002
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 206.780° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 8110.00ft.,
The Bottom Hole Displacement is 3010.38ft., in the Direction of 206.229° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
8110.00
4189.42
2700.43 S
1330.45 W
Projected Survey
Survey tool program for MPS-23
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth Survey Tool Description
(ft) (ft) (ft) (ft)
0.00
175.00
175.00 Tolerable Gyro
4189.42 AK-6 BP _IFR-AK
0.00
175.00
175.00
8110.00
-------"---~-~-----
- ----------------. +
22 July, 2002. 14:15
Page 6 0'6
o~~.
~/.f
q \7" ).",
, . /~.,
~ BPXA
Milne Point MPS
.
DrillQuest 2.00.08.005
"
¿;; Od-13~
30-Jul-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-23 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
'MD
'MD (if applicable)
8,110.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
t,UG 0 1 2002
Ala8ka Oil & Gas COns. Commission
Anchorage
. ðÞ-
BP EXPLORA TION (ALASKA) INC. ~X)~
~J>~
í$
Milne Point Unit
BPXA
Milne Point MPS, Slot MPS-23
MPS-23 MWD
Job No. AKMW22108, Surveyed: 8 July, 2002
SURVEY REPORT
22 July, 2002
Your Ref: API 500292309800
Surface Coordinates: 5999959.54 N, 565758.11 E (70024' 37.1981" N, 149027' 52.3786" W)
Kelly Bushing: 67. 10ft above Mean Sea Level
SpE!r"'r"Y-!5LJ1!
DRILLING seRVIc:es
A Halliburton Company
Survey Ref: svy10150
Sperry-Sun Drilling Services () .
Survey Report for MPS-23 MWD
Your Ref: API 500292309800 ~~
Job No. AKMW2210B1 Surveyed: 8 JulYI 2002
BP EXPLORATION (ALASKA) INC. ~~~tOin~~~~
Milne Point Unit
~~
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
0.00 0.000 0.000 -67.10 0.00 0.00 N O.OOE 5999959.54 N 565758.11 E 0.00 Tolerable Gyro
175.00 0.500 324.000 107.90 175.00 0.62 N 0.45W 5999960.15 N 565757.66 E 0.286 -0.35 MWD Magnetic
295.91 0.910 16.110 228.80 295.90 1.97 N 0.49 W 5999961.50 N 565757.60 E 0.596 -1.53 ~7
384.24 0.120 4.470 317.13 384.23 2.73 N 0.29W 5999962.27 N 565757.80 E 0.898 -2.31
472.78 0.170 252.840 405.67 472.77 2.79 N 0.41 W 5999962.32 N 565757.68 E 0.273 -2.30
562.82 0.140 232.760 495.70 562.80 2.68N 0.62W 5999962.22 N 565757.46 E 0.068 -2.11
654.14 0.220 219.860 587.02 654.12 2.48 N 0.83W 5999962.01 N 565757.26 E 0.098 -1.84
746.04 0.250 216.320 678.92 746.02 2.18 N 1.06W 5999961.71 N 565757.03 E 0.036 -1.47
840.01 0.630 209.390 772.89 839.99 1.57 N 1.43W 5999961.09 N 565756.66 E 0.408 -0.75
934.28 0.960 208.880 867.15 934.25 0.42 N 2.07W 5999959.95 N 565756.04 E 0.350 0.55
1027.66 0.330 43.940 960.53 1027.63 0.07 S 2.26W 5999959.45 N 565755.85 E 1.372 1.08
1120.67 0.550 51.360 1053.54 1120.64 0.40 N 1.72W 5999959.93 N 565756.38 E 0.244 0.42
1213.93 0.840 54.550 1146.79 1213.89 1.08 N 0.82W 5999960.61 N 565757.28 E 0.314 -0.60
1307.31 1 .440 16.100 1240.15 1307.25 2.60 N 0.06E 5999962.14 N 565758.15 E 1.007 -2.35
1401.10 4.020 348.010 1333.83 1400.93 6.95 N 0.29W 5999966.49 N 565757.76 E 3.019 -6.08
1494.56 3.890 334.290 1427.07 1494.17 13.01 N 2.35W 5999972.53 N 565755.65 E 1.020 -10.56
1587.80 4.620 305.870 1520.06 1587.16 18.06 N 6.76W 5999977.54 N 565751.19 E 2.364 -13.08
1681 .4 7 5.240 302.670 1613.38 1680.48 22.58 N 13.42 W 5999982.00 N 565744.49 E 0.724 -14.11
1775.35 5.430 318.080 1706.86 1773.96 28.20 N 20.00 W 5999987.57 N 565737.87 E 1.535 -16.17
1868.80 5.530 319.720 1799.89 1866.99 34.93 N 25.86 W 5999994.24 N 565731.94 E 0.199 -19.53 ---~
1962.18 5.820 322.090 1892.81 1959.91 42.10 N 31.68 W 6000001.36 N 565726.06 E 0.399 -23.31
2055.35 7.270 321.350 1985.37 2052.47 50.43 N 38.26 W 6000009.63 N 565719.40 E 1.559 -27.78
2148.49 11.540 320.300 2077.24 2144.34 62.20 N 47.90 W 6000021.32 N 565709.66 E 4.588 -33.95
2242.18 16.850 320.740 2168.03 2235.13 79.94 N 62.49 W 6000038.93 N 565694.92 E 5.669 -43.21
2335.61 21.720 321.850 2256.19 2323.29 104.04 N 81.75 W 6000062.85 N 565675.45 E 5.227 -56.04
2428.77 24.400 323.480 2341.90 2409.00 133.06 N 103.85 W 6000091.68 N 565653.09 E 2.957 -72.00
2523.29 29.400 321.750 2426.17 2493.27 166.99 N 129.85 W 6000125.38 N 565626.79 E 5.354 -90.57
2616.90 33.550 321.720 2505.99 2573.09 205.36 N 160.12W 6000163.48 N 565596.19 E 4.433 -111.19
2709.95 36.970 320.780 2581.96 2649.06 247.23 N 193.75 W 6000205.06 N 565562.19 E 3.721 -133.42
2799.73 34.970 321.850 2654.62 2721.72 288.38 N 226.71 W 6000245.92 N 565528.87 E 2.335 -155.30
- ----- -----~ -. ------ -- - -- ----- -
22 July, 2002 - 14:58
Page 20f6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services () .
Survey Report for MPS-23 MWD
Your Ref: API 500292309800 ~~~~
Job No. AKMW22108, Surveyed: 8 July, 2002
BP EXPLORATION (ALASKA) INC. rll" BPXA
Milne Point Unit ~oint MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) COli OOft)
2893.38 32.610 320.570 2732.44 2799.54 328.99 N 259.32 W 6000286.23 N 565495.90 E 2.632 -176.86
2986.70 33.560 321.010 2810.63 2877.73 ~ 368.46 N 291.53 W 6000325.42 N 565463.35 E 1.050 -197.59 -.
3080.43 35.140 321.240 2888.01 2955.11 409.63 N 324.72 W 6000366.30 N 565429.80 E 1.691 -219.39
3173.36 35.900 320.760 2963.65 3030.75 451.59 N 358.70 W 6000407.95 N 565395.45 E 0.871 -241.54
3266.63 37.110 320.720 3038.62 3105.72 494.55 N 393.81 W 6000450.60 N 565359.96 E 1.298 -264.07
3360.46 33.860 318.920 3115.01 3182.11 536.18 N 428.92 W 6000491.92 N 565324.49 E 3.638 -285.41
3453.84 33.650 316.940 3192.65 3259.75 574.69 N 463.68 W 6000530.13 N 565289.39 E 1.199 -304.14
354 7.11 33.060 312.010 3270.57 3337.67 610.60 N 500.23 W 6000565.72 N 565252.52 E 2.974 -319.73
3640.38 33.530 298.100 3348.65 3415.75 639.81 N 541.92 W 6000594.55 N 565210.58 E 8.188 -327.01
3733.93 35.150 290.530 3425.93 3493.03 661.43 N 589.95 W 6000615.75 N 565162.36 E 4.879 -324.68
3827.26 37.380 283.140 3501.21 3568.31 677.30 N 642.73 W 6000631.16 N 565109.44 E 5.254 -315.06
3920.09 40.410 276.220 3573.49 3640.59 686.98 N 700.13 W 6000640.33 N 565051.96 E 5.702 -297.84
4013.77 40.380 264.990 3644.93 3712.03 687.62 N 760.62 W 6000640.43 N 564991.46 E 7.761 -271.16
4107.22 41.870 253.330 3715.42 3782.52 676.01 N 820.75 W 6000628.30 N 564931.44 E 8.351 -233.70
4200.88 45.630 247.170 3783.10 3850.20 654.04 N 881.59 W 6000605.79 N 564870.79 E 6.063 -186.67
4294.70 48.490 243.070 3847.02 3914.12 625.10 N 943.84 W 6000576.31 N 564808.80 E 4.418 -132.79
4388.08 49.630 243.800 3908.21 3975.31 593.56 N 1006.94 W 6000544.21 N 564745.99 E 1.356 -76.21
4480.91 52.390 241.920 3966.61 4033.71 560.63 N 1071.12W 6000510.72 N 564682.09 E 3.364 -17.89
4574.51 58.840 237.500 4019.46 4086.56 521.61 N 1137.70 W 6000471.11 N 564615.86 E 7.914 46.94
4667.89 67.590 232.710 4061.52 4128.62 473.88 N 1205.90 W 6000422.78 N 564548.08 E 10.426 120.29
4761.53 73.980 230.110 4092.33 4159.43 418.73 N 1274.95 W 6000367.03 N 564479.52 E 7.310 200.63
4854.77 76.650 228.810 4115.97 4183.07 360.11 N 1343.48 W 6000307.80 N 564411.51 E 3.165 283.84
4942.95 79.290 225.310 4134.35 4201.45 301.36 N 1406.59 W 6000248.50 N 564348.92 E 4.902 364.73
5037.31 88.090 223.860 4144.71 4211.81 234.62 N 1472.35 W 6000181.19 N 564283.75 E 9.450 453.93
5135.61 85.200 219.350 4150.47 4217.57 161.28 N 1537.49 W 6000107.27 N 564219.26 E 5.442 548.76
5169.65 83.780 217.740 4153.73 4220.83 134.78 N 1558.61 W 6000080.59 N 564198.38 E 6.290 581.93
5275.27 90.250 214.760 4159.23 4226.33 49.77 N 1620.93 W 5999995.03 N 564136.81 E 6.742 685.91
5323.14 91.790 208.930 4158.38 4225.48 9.13 N 1646.17 W 5999954.18 N 564111.92 E 12.594 733.56
5368.64 92.090 202.840 4156.84 4223.94 31.76 S 1666.01 W 5999913.11 N 564092.44 E 13.393 779.01
5419.15 90.490 196.640 4155.70 4222.80 79.27 S 1683.06 W 5999865.46 N 564075.81 E 12.674 829.10
~----- .------- -- ----
----.---- ---~-
22 July, 2002 - 14:58
Page 3 of 6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services () .
Survey Report for MPS-23 MWD ~~
Your Ref: API 500292309800
Job No. AKMW22108, Surveyed: 8 July, 2002
II
BP EXPLORATION (ALASKA) INC. 7ìk~Oin~:~~
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inel. Azim. Depth Depth Northlngs Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
5462.01 89.450 194.340 4155.72 4222.82 120.57 S 1694.51 W 5999824.06 N 564064.73 E 5.889 871.12
5507.46 90.490 188.340 4155.75 4222.85 165.11 S 1703.44 W 5999779.44 N 564056.19 E 13.398 914.91 --/
5555.74 90.980 181.340 4155.13 4222.23 213.18 S 1707.51 W 5999731.33 N 564052.54 E 14.533 959.66
5605.09 92.280 179.830 4153.72 4220.82 262.51 S 1708.01 W 5999682.00 N 564052.47 E 4.037 1003.93
5649.47 92.650 179.420 4151.81 4218.91 306.85 S 1707.72 W 5999637.67 N 564053.15 E 1.244 1043.38
5698.45 92.580 179.260 4149.58 4216.68 355.77 S 1707.16 W 5999588.75 N 564054.15 E 0.356 1086.80
5742.33 94.370 178.980 4146.92 4214.02 399.56 S 1706.49 W 5999544.97 N 564055.21 E 4.129 1125.59
5789.80 92.830 178.880 4143.94 4211.04 446.93 S 1705.60 W 5999497.61 N 564056.51 E 3.251 1167.48
5835.48 89.690 177.800 4142.93 4210.03 492.57 S 1704.28 W 5999451.98 N 564058.23 E 7.269 1207.63
5883.60 89.940 177.180 4143.09 4210.19 540.65 S 1702.17 W 5999403.93 N 564060.76 E 1.389 1249.60
5929.48 90.490 176.810 4142.92 4210.02 586.46 S 1699.77 W 5999358.13 N 564063.57 E 1 .445 1289.42
5976.87 89.940 176.660 4142.74 4209.84 633.78 S 1697.07 W 5999310.85 N 564066.69 E 1.203 1330.44
6023.18 89.880 181.290 4142.81 4209.91 680.07 S 1696.24 W 5999264.57 N 564067.92 E 9.999 1371.39
6072.67 89.690 181.450 4143.00 '4210.10 729.54 S 1697.42 W 5999215.08 N 564067.18 E 0.502 1416.09
6115.87 88.710 179.940 4143.60 4210.70 772.73 S 1697.95 W 5999171.89 N 564067.03 E 4.167 1454.89
6165.86 88.770 182.670 4144.70 4211.80 822.69 S 1699.08 W 5999121.92 N 564066.33 E 5.461 1500.00
6209.15 91.600 184.340 4144.56 4211.66 865.90 S 1701.73 W 5999078.69 N 564064.07 E 7.590 1539.76
6258.36 91.850 183.510 4143.08 4210.18 914.97 S 1705.10 W 5999029.60 N 564061.13 E 1.761 1585.09
6303.61 89.940 184.940 4142.37 4209.47 960.09 S 1708.43 W 5998984.45 N 564058.20 E 5.273 1626.87
6352.40 89.320 184.600 4142.69 4209.79 1008.71 S 1712.49 W 5998935.80 N 564054.57 E 1 .449 1672.10 '- /
6397.03 90.250 183.740 4142.86 4209.96 1053.22 S 1715.73 W 5998891.26 N 564051.72 E 2.838 1713.30
6446.91 90.620 184.390 4142.48 4209.58 1102.97 S 1719.27 W 5998841.48 N 564048.62 E 1.499 1759.31
6490.47 90.060 184.640 4142.22 4209.32 1146.39 S 1722.70 W 5998798.02 N 564045.57 E 1.408 1799.62
6538.12 89.880 185.740 4142.24 4209.34 1193.85 S 1727.01 W 5998750.53 N 564041.68 E 2.339 1843.93
6584.23 90.310 185.340 4142.17 4209.27 1239.74 S 1731.46 W 5998704.60 N 564037.63 E 1.274 1886.91
6633.86 90.060 185.400 4142.01 4209.11 1289.15 S 1736.10 W 5998655.15 N 564033.42 E 0.518 1933.11
6677.15 90.180 186.550 4141.92 4209.02 1332.21 S 1740.61 W 5998612.06 N 564029.30 E 2.671 1973.58
6724.81 91.110 181.630 4141.38 4208.48 1379.73 S 1744.01 W 5998564.51 N 564026.32 E 10.505 2017.53
6770.59 90.550 176.750 4140.72 4207.82 1425.48 S 1743.36 W 5998518.76 N 564027.37 E 10.728 2058.09
6812.62 90.250 173.500 4140.42 4207.52 1467.36 S 1739.79 W 5998476.92 N 564031.31 E 7.765 2093.86
- --------~----------
22 July, 2002 - 14:58
Page 4 of6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services D~~ .
Survey Report for MPS-23 MWD
Your Ref: API 500292309800 *Wh
Job No. AKMW22108, Surveyed: 8 July, 2002
BP EXPLORATION (ALASKA) INC. IV~ BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/1 OOft)
6863.97 88.220 168.150 4141.11 4208.21 1518.02 S 1731.61 W 5998426.33 N 564039.93 E 11.142 2135.41
6915.75 86.120 168.600 4143.66 4210.76 1568.68 S 1721.19 W 5998375.77 N 564050.80 E 4.147 2175.93
6957.79 85.930 169.160 4146.58 4213.68 1609.83 S 1713.10W 5998334.69 N 564059.25 E 1.404 2209.03 -
7006.45 88.150 168.290 4149.09 4216.19 1657.48 S 1703.60 W 5998287.12 N 564069.17 E 4.899 2247.29
7051.11 89.510 167.990 4150.00 4217.10 1701.18 S 1694.42 W 5998243.51 N 564078.73 E 3.118 2282.16
7099.46 89.450 168.260 4150.44 4217.54 1748.49 S 1684.47 W 5998196.29 N 564089.10 E 0.572 2319.92
7144.70 90.000 169.080 4150.66 4217.76 1792.85 S 1675.58 W 5998152.01 N 564098.38 E 2.182 2355.51
7193.97 88.830 164.530 4151.16 4218.26 1840.80 S 1664.34 W 5998104.16 N 564110.04 E 9.535 2393.26
7237.92 88.830 163.910 4152.06 4219.16 1883.09 S 1652.39 W 5998061.98 N 564122.36 E 1.410 2425.62
7286.66 86.980 162.990 4153.84 4220.94 1929.77 S 1638.52 W 5998015.42 N 564136.65 E 4.238 2461.05
7331.49 86.550 163.290 4156.37 4223.47 1972.61 S 1625.54 W 5997972.70 N 564150.00 E 1.169 2493.44
7380.49 87.600 162.020 4158.87 4225.97 2019.32 S 1610.95 W 5997926.12 N 564165.00 E 3.360 2528.57
7424.77 89.020 162.130 4160.18 4227.28 2061.43 S 1597.33 W 5997884.13 N 564178.99 E 3.216 2560.03
7473.38 89.380 162.350 4160.86 4227.96 2107.72 S 1582.50 W 5997837.97 N 564194.23 E 0.868 2594.67
7517.24 90.860 161.860 4160.76 4227.86 2149.45 S 1569.02 W 5997796.36 N 564208.07 E 3.554 2625.86
7565.51 91.170 160.010 4159.91 4227.01 2195.07 S 1553.26 W 5997750.88 N 564224.24 E 3.885 2659.48
7610.51 91.050 160.020 4159.04 4226.14 2237.35 S 1537.88 W 5997708.74 N 564239.98 E 0.268 2690.30
7660.62 90.920 159.160 4158.18 4225.28 2284.31 S 1520.41 W 5997661.94 N 564257.87 E 1.735 2724.34
7701.20 93.510 159.170 4156.61 4223.71 2322.20 S 1505.99 W 5997624.17 N 564272.62 E 6.383 2751.68
7757.78 94.000 158.590 4152.90 4220.00 2374.87 S 1485.65 W 5997571.69 N 564293.43 E 1.340 2789.53 ~.
7796.38 98.760 157.640 4148.61 4215.71 2410.45 S 1471.35 W 5997536.23 N 564308.04 E 12.572 2814.86
7835.42 98.470 157.710 4142.77 4209.87 2446.16 S 1456.69W 5997500.65 N 564323.01 E 0.764 2840.13
7890.92 100.100 157.400 4133.81 4200.91 2496.78 S 1435.78 W 5997450.21 N 564344.37 E 2.988 2875.90
7940.34 93.450 156.640 4127.99 4195.09 2541.93 S 1416.63 W 5997405.23 N 564363.92 E 13.542 2907.58
7983.33 91.720 155.870 4126.05 4193.15 2581.24 S 1399.34 W 5997366.08 N 564381.55 E 4.404 2934.88
8040.02 91.660 156.190 4124.37 4191.47 2633.02 S 1376.32 W 5997314.50 N 564405.03 E 0.574 2970.73
8110.00 91.660 156.190 4122.35 4189.45 2697.02 S 1348.08 W 5997250.76 N 564433.83 E 0.000 3015.14 Projected Survey
----~ - --- -
---- -~-
---------- ----
22 July, 2002 - 14:58
Page 50f6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for MPS-23 MWD
Your Ref: API 500292309800
Job No. AKMW2210B, Surveyed: B July, 2002
.
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
ð~~
~ ; BPXA
Iflì~ Milne Point MPS
~
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 206.780° (True).
.-
Based upon Minimum Curvature type calculations, at a Measured Depth of 8110.00ft.,
The Bottom Hole Displacement is 3015.17ft., in the Direction of 206.558° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
8110.00
4189.45
2697.02 S
1348.08 W
Projected Survey
Survey tool program for MPS-23 MWD
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth Survey Tool Description
(ft) (ft) (ft) (ft)
"""",/
0.00
175.00
0.00
175.00
175.00
8110.00
175.00 Tolerable Gyro
4189.45 MWD Magnetic
- ----- -- ----~------
---~---~- ---~
22 July, 2002 - 14:58
Page 60'6
DrillQuest 2.00.08.005
~ I:j ?!Ær;-?~;.'
'I ^ Ii!
! ¡ il' ¡ I '. .
j 'U LS
)
!....r0.1L
wJû
}
IK\ n fE\ @ G1 !M
W 11 Lro ~ U\1 Lru
TONY KNOWLES, GOVERNOR
AI,ASIiA OIL AND GAS
CONSERVATION COMMISSION
333 W. PH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
July 1, 2002
Pat Archey
BP Exploration (Alaska), Inc.
Drilling Department
PO Box 196612
Anchorage Alaska 99519
Re:
Permit to Drill 202-132
Dear Mr. Archey:
Last week the Commission approved the above-referenced application for permit to drill.
The approval letter inadvertently included two sentences from a template generally used
for exploratory wells. Please disregard the following requirement that was included in
the approval letters :
"A weekly status report is required from the time the well is spudded
until it is suspended or plugged and abandoned. The report should be a
generalized synopsis of the week's activities and is exclusively for the
Commission's internal use."
We apologize for any inconvenience this may have caused you.
Sincerely,
(f)/h... f~'~~J.fd
~~~~chsli Taylor~- Ò~.
Chair
)
(~. ~ I f fK\ ~.ï1 r. [[~ rl~~.1 ~ I.@\..
Q1) u fJ-Ù, U L1':J tJ) U Ii u
)
(;'7"-
t \ 1_1
',\
n1ì
~~I
TONY KNOWLES, GOVERNOR
.A.I~A.~KA OIL AND GAS
CONSERVATION COMMISSION
333 W. PH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re:
Milne Point Unit l\1PS-23
BP Exploration (Alaska), Inc.
Permit No: 202-132
Surface Location: 3293' NSL 252' WEL, Sec. 12, T12N, R10E, UM
Bottomhole Location: 584' NSL, 1619' WEL, Sec. 12, TI2N, RI0E, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to drill the above development well.
The permit to drill does not exempt you from obtaining additional permits or approvals required by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued. A weekly status report is required from the
time the well is spudded until it is suspended or plugged and abandoned. The report should be a
generalized synopsis of the week's activities and is exclusively for the Commission's internal use.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicaþle provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient
notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe
must be given so that a representative of the Commission may witness the test. Notice may be given by
contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
cÞ, {kLt '¥
cam:techsli Taylor
Chair
BY ORDER OF THE COMMISSION
DATED this~day of June, 2002
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Hole
42"
9-7/8"
6-1/8"
1 STATE OF ALASKA \
ALASKA vi AND GAS CONSERVATION COMMI,-"'.=,ION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (OF or KB) 10. Field and Pool
Planned KBE :;:: 68.001 Milne Point Unit / Schrader
6. Property Designation Bluff
ADL 380109
7. Unit or Property Name
Milne Point Unit
8. Well Number /
MPS.23
9. Approximate spud dqte
07/01/02 / Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 8068' MD 14242' TVD
17. Anticipated pressure {S~'20 AAC 25.035 (e) (2)}
Maximum surface 1488 psig, At total depth (TVD) 4256' 11914 psig
Setting Depth
Top Bottom
MD TVD MD TVD
Surface Surface 1131 1131
Surface Surface 5067' 4257'
49671 42401 8068' 42421
r/)~J
~6A- ä l'f¡ 0 1-
~ I:i&£-"
1 a. Type of work II Drill 0 Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3293' NSL, 2521 WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
3484' NSL, 16651 WEL, SEC. 12, T12N, R10E, UM
At total depth
5841 NSL, 16191 WEL, SEC. 12, T12N, R10E, UM
12. Distance to nearest property line 13. Distance to nearest well /
ADL 025637,5841 MD (APPROX.) No Close Approach
16. To be completed for deviated wells .,/
Kick Off Depth 14001 MD Maximum Hole Angle 94.720
18. Casin~ Program Specifications
Size
Casina Weiaht Grade Couplina
20" 92# H-40 Welded
7-5/8" 29.7# L-80 BTC
4-1/2" 12.7# L-80 BTC
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
Lenath
80'
5067'
31011
Quantitv of Cement
. (include staae data)
260 sx Arctic Set (Approx.)
487 sx Class 'LI, 266 sx Class IG'
Uncemented Slotted Liner .,/
./
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Junk (measured)
Plugs (measured)
Casing
Length
Size
Cemented
MD
TVD
Structural
Conductor
Surface
Intermediate
Production
Liner
RECEIVED
JüN 2 ~j 2002
Perforation depth: measured
true vertical
Alaska DB & Gas Gons. Gomnllssion
Anchorage
20. Attachments
II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number. Steve Campbell, 564-4401 Prepared By Name/Number: Sondra Stewman, 564-4750
21. I hereby certify that th.leAoregOij¡,is t/--; ~ . ~.ru.e. .a. n.d. .correct to.t.he b. e. ~t Of. ..m... y ~...n...ow.. .I.~..~.g. e . 0 / ": /
Signed Pat Archey {J"3 iL-. 7 ~:::;:;g Engineer Date ;17/ Ci ~
Permit Number API Number ApP,f?v~ D0at . See cover lett,er
.2. 0 2.. -- /...3? 50- 02. 9- 2. 3 <=' <J <g ; (:Il) (h (/?-.. for other reaUlrements
Conditions of Approval: Samples Required 0 Yes ~ No Mud Log Require 0 Yes J8 No
Hydrogen Sulfide Measures 0 Yes IãJ No Directional Survey Required "'iI Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: re£~gIlßp£Eedj-~ 4000 pj/.
gn BY by order of
Cammy Oechsli Tayt()í Commissioner the commission
(JF~i(;t¡\fJ\l
Approved By
Form 10-401 Rev. 12-01-85
Date &'(1 (ë' h ;~-
Sibt~it In4~i~licate
)
IWell Name: I MPS-23
Drill and Complete Plan Summary
Milne Pc )MPS-23 Well Permit
I Type of Well (service / producer / injector): 1 Multi Lateral Producer "OA" & "OB" / I
19861 FNL, (32921 FSL), 2521 FEL, (50261 FWL), SEC. 12, T12N, R10E
E=565,758.06 N=5,999,959.55
16321 FNL, (36461 FSL), 1535 FEL, (37441 FWL), SEC. 12, T12N,R10E
E=564472.25 N=6,OOO,303.20 Z=4213' TVD
46941 FNL, (5841 FSL), 1619 FEL, (36601 FWL), SEC. 12, T12N,R1 OE
E=564415.00 N=5,997,240.00 Z=44192' TVD
1794' FNL, (34841 FSL), 1665 FEL, (36131 FWL), SEC. 12, T12N,R1 OE
E=564,343.17 N=6,OOO,139.59 Z=4256' TVD
46941 FNL, (5841 FSL), 1619 FEL, (36601 FWL), SEC. 12, T12N,R1 OE
E=564415.00 N=5,997,240.00 Z=4192' TVD
46941 FNL, (5841 FSL), 1619 FEL, (36601 FWL), SEC. 12, T12N,R1 OE
E=564415.00 N=5,997,240.00 Z=4192' TVD
I AFE Number: 1 TBD I RiQ: 1 Doyon 141 /" I
I Estimated Start Date: 1 July 1, 2002 I I OperatinQ days to complete: 123 // I
1 MD: 18068 1 1 TVD: 14242 1 I Max Inc: 194 1 I KOP: 114001 1 KBE: 168 I
I Well DesiQn (conventional, slimhole, etc.): I Conventional Grass Roots ML Producer I
I
Surface Location:
Target Location:
TOP "OA"
Target Location:
BHL "OA" Well TD
Target Location:
TOP "OB"
Target Location:
BHL "OB" Well TD
TOTAL DEPTH
1 Objective: I Schrader "OA" & "OB"
Mud Program:
9-7/8" Surface Hole Mud Properties:
Density (ppg) Funnel visc YP
HTHP
Spud - LSND Freshwater Mud
pH API Fi Itrate LG
Solids
< 6.5
8.6 - 9.20/ 75 -150
25 - 60
N/A
9.0-9.5
<8
KCL-CaC03 Flow Pro
pH API Filtrate LG
Solids
<12
6-1/8" Production Hole Mud Properties:
Density (ppg) Funnel visc YP HTHP
8.6 - 9.20 / 40 55 22 - 27 <10 8.0 - 8.5 4 - 6
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation /
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU IR.
1
)
Milne Pc )MPS-23 Well Permit
Cement Program:
Casing Size 17 5/8" 29.7 lblft L-80 BTC Surface casing
Basis 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below
permafrost
Total Cement
Volume:
Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg
Spacer 50 bbl of Viscosified Spacer (Alpha Design) weighted to 1 0.5~pg
Lead 487 sxs 10.7 lb/gal Class L - 4.15 cuft/sx (cement to surface) /
Tail 266 sxs 15.8 Prem G - 1.15 cuft/sx of tail at 4046' --
Temp BHST ~ 80° F from SOR, BHCT 85° F estimated by Halliburton
Evaluation Program:
9 7/8" Hole Section:
Open Hole:
Cased Hole:
6-1/8" Hole section:
Open Hole:
MWDJGRlRES IFR/CASANDRA
N/a
MWD/GRlRES ABI/IFR/CASANDRA
Formation Markers:
Formation Tops M D kb (ft) TVDrkb Pore Pressure Estimated EMW
r (ft) * (Psi) (ppg)
Base Permafrost 1767 1767 794 8.65
SVl N/A
Top Ugnu 4450 4027 1811 8.65
Top Ugnu M N/A
NA 4546 4090 1839 8.65 /'
NB 4590 4112 1854 8.65
NC 4645 4138 1861 8.65
NE 4673 4150 1866 8.65
NF 4767 4187 1883 8.65
Top OA 4848 4213 1895 8.65
Base OA 4936 4235 1904 8.65
Top OB 5061 4256 1914 8.65
TD 8068 4242 1908 8.65
2
)
. Based on SSrrVD depths
CasinglTubing Program:
Hole Size Csg / WtlFt Grade Conn Length
Tbg O.D.
42" 20" * 92#
97/8" 7 5/8" 29.7#
6-1/8" 4-1/2" 12.7#
6-1/8" 4-1/2" 12.7#
*The 20" casing is insulated
H -40 Welded
L-80 BTC
L-80 BTC
L-, BTC
80'
5067 '
3101 '
3245'
Recommended Bit Pro~ram:
BHA Hole Depth (MD) Bit Type
Size
97/8" 0' - 5067'
6 1/8" 5067' - 8065'
6 1/8" 4827 - 8072'
1
2
3
Smith "Twist"
PDC
PDC
Well Contro~
. p~ hole will be drilled with a diverter. /
Surface Interval
. Maximum anticipated BHP:
. Maximum surface pressure:
. Planned BOP test pressure:
.
. Kick tolerance:
. Planned completion fluid:
Milne Pi ') MPS-23 Well Permit
Top
MD / TVDrkb
0'
0'
4967' /4240
4827' /4207
Bottom
MD / TVDrkb
113' /113'
5067' / 4257' ./
8068' /4242
8072' /4192
Nozzle/Flow
rate
3-13 & 1-10
1914 psi @ 4256' TV~kb - Top of "OB"
1488 psi @ su rface
(Based on BHP and a full column of gas from TD @ 0.1 psi/ft)
Diverter will be function tested. BOP's:Test annular 250 psi low
and 2500 psi high, and rams to 250 psi low and 4,000 psi high.
N/A
9.2 ppg NaC1/6.8 ppg Diesel
Drilling Hazards & Contingencies:
Hydrates
/
. Hydrates have not been seen on S pad, but has been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
3
"
Milne Pf') MPS-23 Well Permit
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
. Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation
. We do not expect losses while drilling this well.
. Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
.
It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the SchraderSluff
formation will be drilled with 9.1 ppg mud.
Pad Data Sheet
.
Please Read the S-Pad Data Sheet thoroughly.
Breathing
.
N/A
Hydrocarbons
.
Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
. NA
Hydrogen Sulfide ,
. MPS Pad is not designated as an H2S Pad. /
Anti-collision Issues
.
MPS-23 has no anti-collision issues.
4
)
DRILL & COMPLETION PROCEDURE
Milne p( ') MPS-23 Well Permit
Pre- Rig Operations
1. The 20" insulated conductor is installed
Procedure
/
1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe
2. Drill 9-7/8" surface hole as per directional plan. Maximum angle 840
3. Condition mud prior to 7 5/8" casing run. POOH ./
4. Run and cement 7 5/8" casing from TD to surface.
5. ND Di verter
6. Install FMC 11" 5m horizontal wellhead
7. N/U and test 13 ~8" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250
low and 4000 psi high /'
8. Drill 6-1/8" OB horizontal production hole as per directional pla~",
9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing. /'
10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD.
a. RIH. Orient and set whipstock to place window ßt top of the OA interval.
b. Shear off and mill window thru 7-5/8" casing. /
11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud
properties and POOH.
12. MU whipstock retrieving tool and pull whipstock /
13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing
14. POOH
15. TIH and displace out drilling mud with 9.2 ppg NaCL
16. POOH
17. Run in hole with 4-1/2" jet pump completion as per schematic
18. Land tubing hanger and test
19. Set BPV
20. ND BOP
21. Install and test tree
22. Pull BPV
23. Drop ball and set production packer j'
24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi
25. Freeze protect thru GLM
26. Install BPV and secure the well
27. RD/MO
5
Field: Milne Point
Well: S-23 ML
DIRECTIONAL
LWD
OPEN HOLE
LOGGING
NONE
NONE
Dir/GR/RES
NONE
)
')
BP EXPLORATION
Milne Point Unit 8-23 & 823 L 1
RDID
IPALAlD IRILUNSa WEUS
ENG: Steve Campbell
RIG: Doyon 141
MSL 35'
RKB: 68'
Actual Surface Location: 3292' FSL & 252' FEL
FORMATION
DEPTH
MD I TVD TOC
HOLE CASING MUD INFO
TOC SIZE SPECS PIT INFO INFORMATION
Wellhead
H-40 FMC Gen 6 20" x 11" 5M
InsulatedWelde N/A
42" d
KOP @ 300 MD
EOB @ 5067' MD
,.
- - Õi~/Re; . - - . - - - - - - - - - - - - - - - - - - - - - - - - - . - -. ,
ABI/GR NONE OA sand 4,838' 4,213' " ...
- - - - - - . - - - - - - - - - - - - - - - - - - - - - .!,~~2~ ~:.1~'. - ... .... -
113'
113'
Top of Lead Cement
Surf
Surf
Base of Permafrost
1,933' 1.822'
Top of Tail Cement
4,046
Top or N sand
4,546' 4,090'
7-5/8" Surface casing 5,067' 4,257'
--Õi~/Re;. - ---- ----- - - --- -- - --- -- -- ------
ABI/GR NONE OB sand 5,061' 4,256'
8,068' 4,242'
-- -- --. - ----- - --- -- - - ----- --,-- --- - -. ------.
6/18/2002
6-1/8" Hole - 4-1/2",12.6#, L-80 Slotted Liner I
9-7/8"
Surface
Casing
75/8" 29.73:8#
L-80
BTC
MW = 9.2
6-1/8" Hole - 4-1/2", 12.6#, L-80 Slotted Liner /
MPS-23ML WBD.xls
.. TREE: 'Cameron 4-1/16" 5M i-JHOi-JOSI::LJ c.;OMi-JLI:: liON
WELLHEAD: FMCGen6 11",5M r"'\D ~-?~ .... ~-?~ L 1
Tubing Head: 11" x 4-112", ~ I ~
FMC Tubing Hanger ~!
112' 20" 92 Ibltt, H-40 Welded ~ ':
Insulated
Diesel Freeze protect to
750' MD
9.2 KCL with corrosion
inhibitor as packer fluid
Jet Pump Installed in
Sliding Sleeve Post rig!
III
~
I Y: L . ~,
7-5/8" 29.7#, L-80, BTC-M
Casing Drift: 6.75
Casing ID: 6.875
Coupling 00: 8.5"
Burst: 6,890 psi
Collapse: 4,790 psi
-
Window in 7" casing @ 4827' MD
Well Inclination @ Window = 70 deg
)
KB. ELEV =67.3'
Cellar Box ELEV = 39.1'
... 42" Hole
4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD ,2000' TVD,
RP shear valve open position
4-1/211, 12.6Ib/ft, L-80, IBT-M
Coupling 00: 5.2"
OrifUIO: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7,500, 80%=6,000 psi
~
"" .
BIW 1- Wire
Phoenix Pressure Gauge (3.850" 10, W/BIW 1- wire down
to lower sensor)
Halliburtion Dura Sleeve XD WIX Nipple (3.813" 10)
Phoenix Pressure Gauge (2.840" 10)
7-5/8" x 4-1/2" S-3 Packer
ISet @ 4,767'MD, 4187' TVDI
3-1/2" HES'XN' nipple 2.750" 10 No Go W/RHC ball & rod
Wireline Entry Guide
Multi-Lateral Junction 4,827'
\~ 6-1/8" OA Lateral TO 8,072' /'
6-1/8" OB Lateral TO 8,068'
....... ---
- - - - - - -
OA Horizontal 6-1/8" hole
r-- -- - - - - - - - -
4-1/2" Slotted Liner W/Hookwall hanger
,
/
~ ~
~~ ,~9-7/8"Hole
¡ ~~
"
\ ... .
-------
" "-- 08 Horizontal 6-1/8" hole
.....-- -- ----
7" Casing Shoe @ 5067' MD
Well Inclination @ Shoe = 77 Degrees
PBTD
TD
DATE
05/01/02
REV. BY
SKC
COMMENTS
Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion
4-1/2" Slotted Liner & Hanger
Milne Point Unit
WFI I : 8-?3
API NO:
¡::¡ D
~'O(>I~ '~
bp
0
~
2:
Ë
E. 2 100
Ö
]
't:
>
2
f-
COMPANY DETAII.5
ß P Amoco
REFERENCE INFORMA llON
C<><>rdioale (N/E) Reference: Wen CerImo: Plan MPS.23. True Nooh
Verucal (TVD) Rerereooe: S-Pad Dev 72.00
Section (VS) Rererence: SIoI- (O.ooN.O.ooE)
M...~~~= ~~~a.va~OO
SURVEY PROGRAM
Deplh Fm Depth To SurYeyIPlan
72.00 800.00 PIamed: MPS-23 WrJ11 VI
800.00 806850 PIamed: MPS-23 W¡fJ7 VI
Dale:
Dale:
Celculalion Melhod: Miniman am,.."
~ ~:= ~~~~r>Ier Nonh
Error Surre..: Elliptical + ûsing
WaminR Mclhod: Rules ß8ICd
700
1/100': 1300' MD, 1300'TVD
Dir 1.5/100': 1400' MD, 1399.99'TVD
1400
: 1700.57' MD, \700' TVD
: 2734.\' MD, 2679.87' TVD
2800
3500
4200
-700
700
þV'
irf~:'
.I
.I
~#
~ #'
#
?Ø".~.... 'J!~~'"
. ,~
. ". "'~
~ -"', "
.,,'
",
Plan: MPS-23 Wrm (plan MPS-231P1an MPS-23)
Tool
Created By: Ken AJJœ
Checked:
Date: 3/28/2002
CÐ-GYRO-SS
MWD+IFR+MS
Reviewed:
WELL DETAILS
Name +NI-S +FJ-W Nor1hing Easting Latitude Longitude 810<
Plan MPS-23 -13.24 -587.14 5999959.55 565758.06 1()024'J7.198N 149"27'S2380W NlA
TARGET DETAILS
Name 1VD +NI-S +F.J-W Nor1hing Easting Shape
MPS-23 T6 4242.00 -2701.88 -1367.08 5997240.00 564415.00 Poinl
MPS-23 T3 4247.00 -127427 -1754.51 5998610.00 564015.00 Point
MPS-23 T2 4252.00 -315.59 -159\.05 5999630.00 564170.00 Poinl
MPS-23 T5 4257.00 -2276.58 -150830 5997670.00 564270.00 Point
MPS-23 TIb 4257.00 187.95 -1416.59 6000135.00 564340.00 Point
MPS-23 T 4 4269.00 -2116.04 -1566.90 5997830.00 564210,00 Poinl
SECITON DErAILS
See MD Ine Azi TVD +N/-S +FJ-W DLeg TFaee VSec Target
1 72.00 0.00 0.00 72.00 0.00 0.00 0.00 0.00 0.00
2 1300.00 0.00 0.00 1300.00 0.00 0.00 0.00 0.00 0.00
3 1400.00 1.00 320.79 1399.99 0.68 -0.55 1.00 320.79 -0.35
4 1700.57 5.51 320.79 1700.00 13.89 -11.34 1.50 0.00 -7.29
5 2001.96 5.51 320.79 2000.00 36.31 -29.62 0.00 0.00 -19.06
6 2734.10 34.79 320.79 2679.87 229.63 -187.33 4.00 0.00 -120.56 ~
7 3501.55 34.79 320.79 3310.10 568.97 -464.16 0.00 0.00 -298.72
8 5067.12 84.00 2\5.00 4257.00 187.95 =:1ö~:¡; or1~:gg -106.41 470.65 MPS-23 Tlb
9 5280.03 92.17 195.31 4264.18 -3.59 -68.01 682.13
10 5564.96 92.17 195.31 4253.40 -278.20 -1581.62 0.00 0.00 961.15
II 5603.53 92.00 193.00 4252.00 -315.59 -1591.05 6.00 -94.13 998.77 MPS-23 T2
12 5632.10 90.49 192.19 4251.38 -343.45 -1597.28 6.00 -151.64 1026.45
13 6291.96 90.49 192.19 4245.72 -988.42 -1736.56 0.00 0.00 1664.98
14 6579.46 89.00 175.00 4247.00 -1274.27 -1754.51 6.00 -94.96 1928.25 MPS-23 T3
15 6703.84 88.15 167.58 4250.10 -1397.09 -1735.70 6.00 -96.62 2029.41
16 7295.38 88.15 167.58 4269.19 -1974.50 -1608.58 0.00 0.00 2487.56
17 7443.08 92.00 159.60 4269.00 -2116.04 -1566.90 -1:gg -64.29 2595.13 MPS-23 T4
18 7488.37 94.72 159.60 4266.35 -2158.41 -1551.14 -0.07 2625.85
19 7561.55 94.72 159.60 4260.33 -2226.77 -1525.71 0.00 0.00 2675.41
20 7614.42 92.50 161.87 4257.00 -2276.58 -1508.30 6.00 134.27 2712.03 MPS-23 T5
21 7624.65 91.89 161.87 4256.61 -2286.29 -1505.12 6.00 180.00 2719.27
22 8068.50 91.89 161.87 4242.00 -2707.88 -1367.08 0.00 0.00 3033.40 MPS-23 T6
CASING DErAILS
No. TVD MD Name Size
1 4257.00 5067.12 75/8" 7.625
2 4242.00 8068.50 4 112" 4.500
FORMATION TOP DErAILS
No. TVDPath MDPath Formation
1 4090.50 4546.91 NA
2 4112.50 4590.52 NB
3 4138.20 4645.26 NC_D /
4 4150.40 4673.04 NE -
5 4187.40 4767.27 NF
6 4213.60 4848.30 OA
7 4235.90 4936.12 TSBC
8 4256.40 5061.51 OB
All TVD depths are
ssTVD plus 72'for RKBE.
1400
I
3500
I
4200
I
4900
Start Dir 10/100': 5067.12' MD, 4257'TVD
End Dir : 5280.03' MD, 4264.\8' TVD
Start Dir 6/100' : 5564.96' MD, 4253.4'TVD Start Dir 6/100' : 7295.38' MD,4269.19'TVD
End Dir : 7488.37' MD, 4266.35' TVD
Start Dir 6/100' : 7561.55' MD, 4260.33'TVD
. fJJLEnd Dir : 7624.65' MD, 4256.61' TVD
. . . - - . -'
i]:f=~:,¿I£JJ~~Lj;~1
ISmtDï~6/lqO'-:. 529~.96'MD;4245.72~ - - ¡¡
i ; i j Iii i i
2\00 2800
Vertical Section at 206.79° [700ft/in]
bp
f.'...~..
if~'
c
2:
0
0
~
+'
"E
t:
~
i: -1200
:;
0
CIJ
Start Dir 4/100' : 2001.96' MD, 2000'TVD
'.'fjnd Dir : 1700.57' MD, 1700' TVD
, Qtart Dir 1.5/100': 1400' MD, 1399.99'TVD
pOO ¡ Start Dir 11100': 1300' MD, 1300'TVD
COMrANY DETAILS
OP Amoco
REFERENCE INFORMATION
Co-ordinale (N/E) Relen:oœ: Wen Ceooe: !'Ian MJ>S.23, True N<1r1h
Verûc81 (IVD) Rerereoœ: S-Pad Dev 72.00
Section (VS) Rerereoce: SIot- (O.OON,O.OOE)
M~.~':= ~~a.v.~00
Calçulaljon M<lhod: Mininun CUrvaore
~ ~=:: !(';vW¿¡- Nor\I1
Error Surr"",,: Elliplical + Casing
WamiJ1K Method: Rules Oall<d
600
! Start Dir 6/1 00' : 3501.55' MD, 3310.1 'TVD
.;
7SI8't~~:o,!;r-:;t~f:l~:~:S71
l';;.~;'hlro' ~SMt+, H4Tro .
End Dir : i563:!.I' MD, ~251~38' tVD
.. ~nd Dir : 2734.1' MD, 2679.87' TVD
-600
.. ...,
. . . .
St~rt Dlr 6/ioo' : 62Ç 1.96 Mq, 42~5.7?'Tvþ
-1800
~ MPS-23 T3
. . . .
í" D;, ,6J03~4' MD,t"il'lD !
. . - .
. . . .
SHit! Dir6l1 00:n95:3~'Mp:4269:i 9TID.
.MPS~23 T4 '",
. End Dir';7A88j 7' t.1D,4f{j6;~5'~VD . :
start Dir 611 ~O':: 75' 'D, 4~60:3J,!\([) n
MPS-23"['5 ' .. ! .: . . ......;
End: Dir : 7624.6 " 4~56A I' T vD :
-2400
MPS"23T6 :
. . MPS-ÜW¡}û7.'
- 3000
-1800
-1200
-600
West(-)/East(+) [600ft/in]
SURVEY rROGRAM
Depth Fm Depth To SmoeylPlan
72.00 800.00 I'Janœd: MJ>S.23 wrm VI
800.00 8068.so rlanœd: MJ>S-23 wrm VI
Plan: MPS-23 WrfJ7 (plan MPS-231P1an MPS.23)
Tool
Created By: Ken Allen
Checked:
Date: 312812002
Date:
Cß.GYRO-SS
MWD+IFR+MS
Reviewed:
Date:
WEILDETAILS
Name +NIoS +fJ-W Nor1Iûog Easting Lat- Loogitude Slot
!'Ian MPS-23 .13.24 -587.14 5999959.55 565758.06 70"24'37.198N 149"27'S2380W NlA
TARGET DETAILS
Name TVD +NIoS +fJ-W Northing Easting Shape
MI'S.23 T6 4242.00 .2707.88 -1367.08 5997240.00 564415.00 Point
MPS-23T3 4247.00 -1274.27 .1754.51 5998670.00 564015.00 roint
MPS-23 T2 4252.00 -315.59 -1591.05 5999630.00 564170.00 Point
MPS-23 TS 4257.00 .2276.58 -150830 5997670.00 564270,00 roint
MI'S-23 Tlb 4257.00 187.95 .1416.59 6000135.00 564340.00 Point
MI'S-23 T 4 4269.00 -2116.04 .1566.90 5997830.00 564210.00 Point
SECTION DETAILS
See MD Jne Azi TVD +N/-S +FJ-W DLeg TFaee VSee Target
1 72.00 0.00 0.00 72.00 0.00 0.00 0.00 0.00 0.00
2 1300.00 0.00 0.00 1300.00 0.00 0.00 0.00 0.00 0.00
3 1400.00 1.00 320.79 1399.99 0.68 -0.55 1.00 320.79 -0.35
4 1700.57 5.51 320.79 1700.00 13.89 -11.34 1.50 0.00 -7.29
5 2001.96 5.51 320.79 2000.00 36.31 -29.62 0.00 0.00 -19.06
6 2734.10 34.79 320.79 2679.87 229.63 -187.33 4.00 0.00 -120.56 ,~
7 3501.55 34.79 320.79 3310.10 568.97 -464.16 0.00 0.00 -298.72
8 5067.12 84.00 215.00 4257.00 187.95 -1416.59 6.00 -106.41 470.65 MPS-23 Tlb
9 5280.03 92.17 195.31 4264.18 -3.59 -1506.45 10.00 -68.01 682.13
10 5564.96 92.17 195.31 4253.40 -278.20 -1581.62 0.00 0.00 961.15
11 5603.53 92.00 193.00 4252.00 -315.59 -1591.05 6.00 -94.13 998.77 MPS-23 T2
12 5632.10 90.49 192.19 4251.38 -343.45 -1597.28 6.00 -151.64 1026.45
13 6291.96 90.49 192.19 4245.72 -988.42 -1736.56 0.00 0.00 1664.98
14 6579.46 89.00 175.00 4247.00 -1274.27 -1754.51 6.00 -94.96 1928.25 MPS-23 T3
15 6703.84 88.15 167.58 4250.10 -1397.09 -1735.70 6.00 -96.62 2029.41
16 7295.38 88.15 167.58 4269.19 -1974.50 -1608.58 0.00 0.00 2487.56
17 7443.08 92.00 159.60 4269.00 -2116.04 -1566.90 6.00 -64.29 2595.13 MPS-23 T4
18 7488.37 94.72 159.60 4266.35 -2158.41 -1551.14 6.00 -0.07 2625.85
19 7561.55 94.72 159.60 4260.33 -2226.77 -1525.71 0.00 0.00 2675.41
20 7614.42 92.50 161.87 4257.00 -2276.58 -1508.30 6.00 134.27 2712.û3 MPS-23 T5
21 7624.65 91.89 161.87 4256.61 -2286.29 -1505.12 6.00 180.00 2719.27
22 8068.50 91.89 161.87 4242.00 -2707.88 -1367.08. 0.00 0.00 3033.40 MPS-23 T6
FORMATION TOP DETAILS
No. TVDPath MDPath Formation
yf" ,'..'
: : ~..._; ~~ : -
: Õ ~... "'~ :
Ii :r~I~~jt~~t~~~
;11. ...' :..' ,/ ..'..........' ........ ... ..' . ..tYJJ.:,. '.
~r ~n~~~'~
~i~;'
~,
1#
i'" ,
:- #'
1 4090.50 4546.91 NA
2 4112.50 4590.52 NB
3 4138.20 4645.26 NC_D
4 4150.40 4673.04 NE
5 4187.40 4767.27 NF
6 4213.60 4848.30 OA
7 4235.90 4936.12 TSBC
8 4256.40 5061.51 OB
CASING DETAILS
--
No. TVD MD Name Size
4257.00 5067.12 75/8" 7.625
4242.00 8068.50 4 1/2" 4.500
All TVD depths are
ssTVD plus 72'for RKBE.
.....'/~~ ~~
v~ /'
,
,
4"
I
~o
I
1WO
)
BP
My Planning Report
Company: BP Amoco
Field: Milne Point
Site: M Pt S Pad
Well: Plan MPS-23
Well path: Plan MPS.23
')
Date: 3/28/2002 Time: 16:13:43 Page:
Co-ordinate(NE) Reference: Well: Plan MPS-23, True North
Vertical (TVD) Reference: S-Pad Dev 72.0
Section (VS) Reference: Well (0.00N,0.00E,206.79Azi)
Survey Calculation Method: Minimum Curvature Db:
Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Field:
Map Zone:
Coordinate System:
Geomagnetic Model:
Site:
M pt S Pad
Site Position:
From: Map
Position Uncertainty:
Ground Level:
Northing: 5999978.00 ft
Easting: 566345.00 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
0.00 ft
0.00 ft
Well:
Plan MPS-23
Slot Name:
+N/-S -13.24 ft Northing: 5999959.55 ft
+E/-W -587.14 ft Easting: 565758.06 ft
Position Uncertainty: 0.00 ft
Well Position:
Latitude:
Longitude:
Wellpath: Plan MPS-23
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
S-Pad Dev
6/29/2001
57460 nT
Depth From (TVD)
ft
0.00
+N/-S
ft
0.00
Height 72.00 ft
Plan:
MPS-23 Wp07
Date Composed:
Version:
Tied-to:
Principal: Yes
Casing Points
Oracle
Alaska, Zone 4
Well Centre
BGGM2001
70 24 37.329 N
149 27 35.171 W
True
0.51 deg
70 24 37.198 N
149 27 52.380 W
Well Ref. Point
0.00 ft
Mean Sea Level
26.28 deg
80.78 deg
Direction
deg
206.79
3/27/2002
1
From: Definitive Path
.. TV!>. .. D.iamëter . HOI..e.'..nS... i.ze
ft . ..... in.. .
5067.12 4257.00 7.625
8068.49 4242.00 4.500
75/8"
4 1/2"
9.875
6.750
Plan Section Information
...MD, InCl.. .. Azim TVD +N/~S .+E/~W OLS.. Build Turn. ..TFO, .. 'fai"get
ft deg . '(jeg ft ft . ft: . deg/1QOftdeg/199ft deg/10Oft .dég.
. .
72.00 0.00 0.00 72.00 0.00 0.00 0.00 0.00 0.00 0.00
1300.00 0.00 0.00 1300.00 0.00 0.00 0.00 0.00 0.00 0.00
1400.00 1.00 320.79 1399.99 0.68 -0.55 1.00 1.00 0.00 320.79
1700.57 5.51 320.79 1700.00 13.89 -11.34 1.50 1.50 0.00 0.00
2001.96 5.51 320.79 2000.00 36.31 -29.62 0.00 0.00 0.00 0.00
2734.10 34.79 320.79 2679.87 229.63 -187.33 4.00 4.00 0.00 0.00
3501.55 34.79 320.79 3310.10 568.97 -464.16 0.00 0.00 0.00 0.00
5067.12 84.00 215.00 4257.00 187.95 -1416.59 6.00 3.14 -6.76 -106.41 MPS-23 T1 b
5280.03 92.17 195.31 4264.18 -3.59 -1506.45 10.00 3.84 -9.25 -68.01
5564.96 92.17 195.31 4253.40 -278.20 -1581.62 0.00 0.00 0.00 0.00
5603.53 92.00 193.00 4252.00 -315.59 -1591.05 6.00 -0.44 -5.99 -94.13 MPS-23 T2
5632.10 90.49 192.19 4251.38 -343.45 -1597.28 6.00 -5.28 -2.85 -151.64
6291.96 90.49 192.19 4245.72 -988.42 -1736.56 0.00 0.00 0.00 0.00
6579.46 89.00 175.00 4247.00 -1274.27 -1754.51 6.00 -0.52 -5.98 -94.96 MPS-23 T3
6703.84 88.15 167.58 4250.10 -1397.09 -1735.70 6.00 -0.68 -5.96 -96.62
7295.38 88.15 167.58 4269.19 -1974.50 -1608.58 0.00 0.00 0.00 0.00
7443.08 92.00 159.60 4269.00 -2116.04 -1566.90 6.00 2.61 -5.41 -64.29 MPS-23 T4
7488.37 94.72 159.60 4266.35 -2158.41 -1551.14 6.00 6.00 -0.01 -0.07
7561.55 94.72 159.60 4260.33 -2226.77 -1525.71 0.00 0.00 0.00 0.00
7614.42 92.50 161.87 4257.00 -2276.58 -1508.30 6.00 -4.19 4.30 134.27 MPS-23 T5
7624.65 91.89 161.87 4256.61 -2286.29 -1505.12 6.00 -6.00 0.00 -180.00
8068.50 91.89 161.87 4242.00 -2707.88 -1367.08 ~ 0.00 0.00 0.00 0.00 MPS-23 T6
)
BP
My Planning Report
')
.',: .,cF:' :.¡.o...cin...I...'..d'. P..:.... ~n.... .y; J3PA(Öþco .
.' Milnepólnt
S.te ... M;Pt$~Ød ..
::...~:.:..,..'....,..,'..,ee....:...II,:....~,.....'..p:.:!.'.a:. ...t:....h'...' plånMP$+23
. .n RlanMp$;.23
Date: 3/28/2002 Time: 16:13:43 Page:
Co-ordinate(NE) Reference: Well: Plan MPS-23, True North
Vertical (fVD) Reference: S-Pad Dev 72.0
Section (VS) Reference: Well (0.00N,0.00E,206.79Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
2
Targets
MPS-23 T6 4242.00 -2707.88 -1367.08 5997240.00 564415.00 70 24 10.565 N 149 28 32.435 W
MPS-23 T3 4247.00 -1274.27 -1754.51 5998670.00 564015.00 70 24 24.664 N 149 28 43.797 W
MPS-23 T2 4252.00 -315.59 -1591.05 5999630.00 564170.00 70 24 34.093 N 149 28 39.013 W
MPS-23 T5 4257.00 -2276.58 -1508.30 5997670.00 564270.00 70 24 14.807 N 149 28 36.576 W
MPS-23 T1 b 4257.00 187.95 -1416.59 6000135.00 564340.00 70 24 39.045 N 149 28 33.902 W
MPS-23 T 4 4269.00 -2116.04 -1566.90 5997830.00 564210.00 70 24 16.386 N 149 28 38.294 W
Formations
,TVl).. .. Fóhriationš ; .. þ~p!~~gl~ : ;pip»~r,~ti()n
.. ft ...: ;¡}:I,%1.::' ,d~.
4546.91 4090.50 NA 0.00 0.00
4590.52 4112.50 NB 0.00 0.00
4645.26 4138.20 NC_D 0.00 0.00
4673.04 4150.40 NE 0.00 0.00
4767.27 4187.40 NF 0.00 0.00
4848.30 4213.60 OA 0.00 0.00
4936.12 4235.90 TSBC 0.00 0.00
5061.51 4256.40 OB 0.00 0.00
Survey
...Iricl.. ..Azim.....:. . TyJj. .sÿs]'yp , .l\1;~pN .. 'VS. 01$< . .. Tòôl/CÓmmeôt
, .¡j7g .deg . Jt . ft .. .... fL ft ~eg/~9~::
. ...
72.00 0.00 0.00 72.00 0.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS
100.00 0.00 0.00 100.00 28.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS
200.00 0.00 0.00 200.00 128.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS
300.00 0.00 0.00 300.00 228.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS
400.00 0.00 0.00 400.00 328.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS
500.00 0.00 0.00 500.00 428.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS
600.00 0.00 0.00 600.00 528.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS
700.00 0.00 0.00 700.00 628.00 5999959.55 565758.06 0.00 0.00 CB-GYRO-SS
800.00 0.00 0.00 800.00 728.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS
900.00 0.00 0.00 900.00 828.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS
1000.00 0.00 0.00 1000.00 928.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS
1100.00 0.00 0.00 1100.00 1028.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS
1200.00 0.00 0.00 1200.00 1128.00 5999959.55 565758.06 0.00 0.00 MWD+IFR+MS
1300.00 0:00 0.00 1300.00 1228.00 5999959.55 565758.06 0.00 0.00 Start Dir 1/100' : 1300' MD, 1
1400.00 1.00 320.79 1399.99 1327.99 5999960.22 565757.50 -0.35 1.00 Start Dir 1.5/100' : 1400' MD,
1500.00 2.50 320.79 1499.95 1427.95 5999962.57 565755.55 -1.60 1.50 MWD+IFR+MS
1600.00 4.00 320.79 1599.78 1527.78 5999966.93 565751.93 -3.90 1.50 MWD+IFR+MS
1700.57 5.51 320.79 1700.00 1628.00 5999973.34 565746.60 -7.29 1.50 End Dir : 1700.57' MD, 1700'
1800.00 5.51 320.79 1798.97 1726.97 5999980.68 565740.51 -11.18 0.00 MWD+IFR+MS
1900.00 5.51 320.79 1898.51 1826.51 5999988.07 565734.37 -15.08 0.00 MWD+IFR+MS
2001.96 5.51 320.79 2000.00 1928:00 5999995.59 565728.12 -19.06 0.00 Start Dir 4/100' : 2001.96' MD
2100.00 9.43 320.79 2097.19 2025.19 6000005.40 565719.98 -24.25 4.00 MWD+IFR+MS
2200.00 13.43 320.79 2195.19 2123.19 6000020.64 565707.32 -32.31 4.00 MWD+IFR+MS
2300.00 17.43 320.79 2291.56 2219.56 6000041.10 565690.33 -43.13 4.00 MWD+IFR+MS
2400.00 21.43 320.79 2385.85 2313.85 6000066.68 565669.08 -56.66 4.00 MWD+IFR+MS
2500.00 25.43 320.79 2477.58 2405.58 6000097.26 565643.68 -72.83 4.00 MWD+IFR+MS
2600.00 29.43 320.79 2566.32 2494.32 6000132.59 565614.25 -91.57 4.00 MWD+IFR+MS
2700.00 33.43 320.79 2651.63 2579.63 6000172.l9 565580.95 -112.78 4.00 MWD+IFR+MS
) BP )
My Planning Report
Company: BP Amoco Date: 3/28/2002 Time: 16:13:43 Page: 3
Field: Milne Point Co-ordinate(NE) Reference: Well: Plan MPS-23, True North
Site: M Pt S Pad Vertical ([VD) Reference: S-Pad Dev 72.0
Well: Plan MPS-23 Section (VS) Reference: Well (0.00N,O.00E,206.79Azi)
Well path: Plan MPS-23 Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD Sys TVD MapN MapE VS DLS TooVComment
ft deg deg ft ft ft . ft ft deg/1 000
2734.10 34.79 320.79 2679.87 2607.87 6000187.50 565568.73 -120.56 4.00 End Dir : 2734.1' MD, 2679.87
2800.00 34.79 320.79 2733.98 2661.98 6000216.42 565544.71 -135.86 0.00 MWD+IFR+MS
2900.00 34.79 320.79 2816.10 2744.10 6000260.32 565508.25 -159.07 0.00 MWD+IFR+MS
3000.00 34.79 320.79 2898.23 2826.23 6000304.21 565471.79 -182.29 0.00 MWD+IFR+MS
3100.00 34.79 320.79 2980.35 2908.35 6000348.10 565435.34 -205.50 0.00 MWD+IFR+MS
3200.00 34.79 320.79 3062.47 2990.47 6000391.99 565398.88 -228.72 0.00 MWD+IFR+MS
3300.00 34.79 320.79 3144.59 3072.59 6000435.89 565362.43 -251.93 0.00 MWD+IFR+MS
3400.00 34.79 320.79 3226.71 3154.71 6000479.78 565325.97 -275.14 0.00 MWD+IFR+MS
3501.55 34.79 320.79 3310.10 3238.10 6000524.35 565288.95 -298.72 0.00 Start Dir 6/100' : 3501.55' MD
3550.00 34.07 315.81 3350.07 3278.07 6000544.64 565270.57 -308.77 6.00 MWD+IFR+MS
3600.00 33.55 310.50 3391.62 3319.62 6000563.47 565250.13 -316.61 6.00 MWD+IFR+MS
3650.00 33.25 305.08 3433.38 3361.38 6000580.14 565228.26 -321.87 6.00 MWD+IFR+MS
3700.00 33.20 299.60 3475.21 3403.21 6000594.57 565205.01 -324.51 6.00 MWD+IFR+MS
3750.00 33.38 294.14 3517.02 3445.02 6000606.74 565180.45 -324.55 6.00 MWD+IFR+MS
3800.00 33.80 288.77 3558.68 3486.68 6000616.62 565154.64 -321.98 6.00 MWD+IFR+MS
3850.00 34.44 283.55 3600.08 3528.08 6000624.17 565127.65 -316.80 6.00 MWD+IFR+MS
3900.00 35.30 278.52 3641.11 3569.11 6000629.38 565099.57 -309.03 6.00 MWD+IFR+MS
3950.00 36.36 273.72 3681.65 3609.65 6000632.23 565070.46 -298.69 6.00 MWD+IFR+MS
4000.00 37.60 269.18 3721.60 3649.60 6000632.71 565040.40 -285.82 6.00 MWD+IFR+MS
4050.00 39.01 264.91 3760.84 3688.84 6000630.82 565009.49 -270.43 6.00 MWD+IFR+MS
4100.00 40.56 260.89 3799.27 3727.27 6000626.57 564977.80 -252.59 6.00 MWD+IFR+MS
4150.00 42.24 257.13 3836.78 3764.78 6000619.97 564945.41 -232.33 6.00 MWD+IFR+MS
4200.00 44.04 253.62 3873.27 3801.27 6000611.03 564912.43 -209.71 6.00 MWD+IFR+MS
4250.00 45.94 250.33 3908.63 3836.63 6000599.79 564878.93 -184.79 6.00 MWD+IFR+MS
4300.00 47.92 247.25 3942.78 3870.78 6000586.27 564845.02 -157.65 6.00 MWD+IFR+MS
4350.00 49.98 244.36 3975.62 3903.62 6000570.50 564810.77 -128.35 6.00 MWD+IFR+MS
4400.00 52.12 241.65 4007.05 3935.05 6000552.54 564776.30 -96.98 6.00 MWD+IFR+MS
4450.00 54.30 239.09 4037.00 3965.00 6000532.44 564741.69 -63.62 6.00 MWD+IFR+MS
4500.00 56.55 236.66 4065.37 3993.37 6000510.23 564707.03 -28.36 6.00 MWD+IFR+MS
4546.91 58.69 234.50 4090.50 4018.50 6000487.55 564674.56 6.36 6.00 NA
4550.00 58.83 234.36 4092.10 4020.10 6000486.00 564672.43 8.69 6.00 MWD+IFR+MS
4590.52 60.71 232.58 4112.50 4040.50 6000464.91 564644.49 39.97 6.00 NB
4600.00 61.16 232.17 4117.11 4045.11 6000459.80 564637.97 47.45 6.00 MWD+IFR+MS
4645.26 63.29 230.27 4138.20 4066.20 6000434.44 564606.99 83.90 6.00 NC_D
4650.00 63.51 230.08 4140.32 4068.32 6000431.70 564603.76 87.79 6.00 MWD+IFR+MS
4673.04 64.61 229.14 4150.40 4078.40 6000418.14 564588.10 106.89 6.00 NE
4700.00 65.90 228.07 4161.68 4089.68 6000401.79 564569.87 129.62 6.00 MWD+IFR+MS
4750.00 68.31 226.13 4181.14 4109.14 6000370.14 564536.42 172.81 6.00 MWD+IFR+MS
4767.27 69.15 225.48 4187.40 4115.40 6000358.82 564524.98 188.03 6.00 NF
4800.00 70.75 224.26 4198.62 4126.62 6000336.85 564503.49 217.25 6.00 MWD+IFR+MS
4848.30 73.12 222.51 4213.60 4141.60 6000303.20 564472.25 261.26 6.00 OA
4850.00 73.20 222.45 4214.09 4142.09 6000301.99 564471.16 262.82 6.00 MWD+IFR+MS
4900.00 75.67 220.68 4227.51 4155.51 6000265.68 564439.54 309.39 6.00 MWD+IFR+MS
4936.12 77.46 219.42 4235.90 4163.90 6000238.59 564417.17 343.58 6.00 TSBC
4950.00 78.15 218.95 4238.83 4166.83 6000228.00 564408.70 356.83 6.00 MWD+IFR+MS
5000.00 80.64 217.25 4248.03 4176.03 6000189.06 564378.72 405.02 6.00 MWD+IFR+MS
5050.00 83.14 215.57 4255.08 4183.08 6000148.97 564349.71 453.82 6.00 MWD+IFR+MS
5061.51 83.72 215.19 4256.40 4184.40 6000139.59 564343.17 465.13 6.00 OB
5067.12 84.00 215.00 4257.00 4185.00 6000135.00 564340.00 470.65 6.00 MPS-23 T1 b
5100.00 85.24 211.94 4260.08 4188.08 6000107.54 564322.19 503.15 10.00 MWD+IFR+MS
5150.00 87.15 207.31 4263.40 4191.40 6000063.98 564297.93 552.97 10.00 MWD+IFR+MS
5200.00 89.08 202.69 4265.05 4193.05 6000018.52 564277 .22 602.90 10.00 MWD+IFR+MS
)
BP
My Planning Report
')
. . ..." .. ..... ....
,.. ..cF......:..I.oe..)nl...d..:.'.~.::..any:. BPAmOþo. .
,. Mihïepô¡nt .
. :$né~:.; ., MpfSPäO' . .
Well,' PlànMP$+23 ..
::~~él~~å.t~: '..PlåriMÞS~23...
Survey
:~ . .
... ..... ..... .. ..'''' .. . ..... .
..¡li\!;~;~:!f~]ltftk::~:;t' A,
.Suii'ëyÇ~lc~,i~ti(jô1\J:êtitod:, Minim;~mêûï;VåtU'rê . . .., . ',Db::, prada.
MD
ft
5250.00
5280.03
5300.00
5400.00
5500.00
Incl Azim
deg deg
91.01 198.08
92.17 195.31
92.17 195.31
92.17 195.31
92.17 195.31
Sys TVD
ft
4193.02
4192.18
4191.43
4187.64
4183.86
TVD
ft
4265.02
4264.18
4263.43
4259.64
4255.86
MapN
ft
5999971.52
5999942.70
5999923.41
5999826.81
5999730.21
5564.96 92.17 195.31 4253.40 4181.40 5999667.46
5603.53 92.00 193.00 4252.00 4180.00 5999630.00
5632.10 90.49 192.19 4251.38 4179.38 5999602.08
5700.00 90.49 192.19 4250.80 4178.80 5999535.59
5800.00 90.49 192.19 4249.94 4177.94 5999437.68
5900.00 90.49 192.19 4249.08 4177.08 5999339.76
6000.00 90.49 192.19 4248.22 4176.22 5999241.85
6100.00 90.49 192.19 4247.36 4175.36 5999143.93
6200.00 90.49 192.19 4246.50 4174.50 5999046.01
6291.96 90.49 192.19 4245.72 4173.72 5998955.97
6300.00 90.45 191.71 4245.65 4173.65 5998948.09
6350.00 90.19 188.72 4245.37 4173.37 5998898.82
6400.00 89.93 185.73 4245.32 4173.32 5998849.17
6450.00 89.67 182.74 4245.49 4173.49 5998799.29
6500.00 89.41 179.75 4245.90 4173.90 5998749.30
6550.00 89.15 176.76 4246.52 4174.52 5998699.36
6579.46 89.00 175.00 4247.00 4175.00 5998670.00
6600.00 88.86 173.78 4247.38 4175.38 5998649.58
6650.00 88.51 170.79 4248.53 4176.53 5998600.12
6703.84 88.15 167.58 4250.10 4178.10 5998547.36
6800.00 88.15 167.58 4253.20 4181.20 5998453.69
6900.00 88.15 167.58 4256.43 4184.43 5998356.29
7000.00 88.15 167.58 4259.66 4187.66 5998258.88
7100.00 88.15 167.58 4262.89 4190.89 5998161.47
7200.00 88.15 167.58 4266.11 4194.11 5998064.06
7295.38 88.15 167.58 4269.19 4197.19 5997971.16
7300.00 88.27 167.33 4269.34 4197.34 5997966.66
7350.00 89.57 164.63 4270.28 4198.28 5997918.27
7400.00 90.88 161.93 4270.08 4198.08 5997870.53
7443.08 92.00 159.60 4269.00 4197.00 5997830.00
7450.00 92.42 159.60 4268.73 4196.73 5997823.54
7488.37 94.72 159.60 4266.35 4194.35 5997787.77
7500.00 94.72 159.60 4265.39 4193.39 5997776.94
7561.55 94.72 159.60 4260.33 4188.33 5997719.65
7600.00 93.11 161.25 4257.71 4185.71 5997683.62
7614.42 92.50 161.87 4257.00 4185.00 5997670.00
7624.65 91.89 161.87 4256.61 4184.61 5997660.31
7700.00 91.89 161.87 4254.13 4182.13 5997588.96
7800.00 91.89 161.87 4250.84 4178.84 5997494.27
7900.00 91.89 161.87 4247.55 4175.55 5997399.57
8000.00 91.89 161.87 4244.25 :4172.25 5997304.87
8068.49 91.89 161.87 4242.00 4170.00 5997240.01
8068.50 91.89 161.87 4242.00 4170.00 5997240.00
MapE
ft
564260.22
564251.85
564246.75
564221.22
564195.68
VS
ft
652.57
682.13
701.68
799.61
897.54
DLS
deg/10OO
10.00 MWD+IFR+MS
10.00 End Dir : 5280.03' MD, 4264.1
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
Tool/Comment
564179.10 961.15 0.00 Start Dir6/100': 5564.96' MD
564170.00 998.77 6.00 MPS-23 T2
564164.02 1026.45 6.00 End Dir : 5632.1' MD, 4251.38
564150.27 1092.16 0.00 MWD+IFR+MS
564130.03 1188.93 0.00 MWD+IFR+MS
564109.78 1285.69 0.00 MWD+IFR+MS
564089.54 1382.46 0.00 MWD+IFR+MS
564069.29 1479.23 0.00 MWD+IFR+MS
564049.05 1575.99 0.00 MWD+IFR+MS
564030.43 1664.98 0.00 Start Dir 6/100' : 6291.96' MD
564028.84 1672.75 6.00 MWD+IFR+MS
564020.41 1720.67 6.00 MWD+IFR+MS
564014.56 1767.78 6.00 MWD+IFR+MS
564011.31 1813.95 6.00 MWD+IFR+MS
564010.66 1859.05 6.00 MWD+IFR+MS
564012.63 1902.97 6.00 MWD+IFR+MS
564015.00 1928.25 6.00 MPS-23 T3
564017.19 1945.58 6.00 MWD+IFR+MS
564024.33 1986.77 6.00 MWD+IFR+MS
564034.89 2029.41 6.00 End Dir : 6703.84' MD, 4250.1
564056.38 2103.88 0.00 MWD+IFR+MS
564078.72 2181.33 0.00 MWD+IFR+MS
564101.07 2258.79 0.00 MWD+IFR+MS
564123.42 2336.24 0.00 MWD+IFR+MS
564145.77 2413.69 0.00 MWD+IFR+MS
564167.08 2487.56 0.00 Start Dir 6/100' : 7295.38' MD
564168.12 2491.13 6.00 MWD+IFR+MS
564180.66 2528.97 6.00 MWD+IFR+MS
564195.46 2565.23 6.00 MWD+IFR+MS
564210.00 2595.13 6.00 MPS-23 T4
564212.47 2599.83 6.00 MWD+IFR+MS
564226.13 2625.85 6.00 End Dir : 7488.37' MD, 4266.3
564230.27 2633.73 0.00 MWD+IFR+MS
564252.16 2675.41 0.00 Start Dir6/100': 7561.55' MD
564265.32 2701.88 6.00 MWD+IFR+MS
564270.00 2712.03 6.00 MPS-23 T5
564273.27 2719.27 6.00 End Dir : 7624.65' MD, 4256.6
564297.33 2772.59 0.00 MWD+IFR+MS
564329.26 2843.37 0.00 MWD+IFR+MS
564361.19 2914.14 0.00 MWD+IFR+MS
564393.12 2984.92 0.00 MWD+IFR+MS
564415.00 3033.39 0.00 41/2"
564415.00 3033.40 0.00 MPS-23 T6
O...'.:'''..~p
:. - -...
COMPANY DETAILS
ßP Arooco
Cllculation Method: Minirmm a.v.hR
= ~:= ~,;..W¿'~rxkr Nor1h
Error Surrlce: EDip6cll + Cuing
Wlrl1in~ Method: Rules Based
REFERENCE INFORMA TJON
Û><>Idinalc (N/E) Relên:nce: Wen c..me: !'Ian MPS-23, True Nonh
Verticil (IVD) Rerermœ: S-Pld Dev 72.00
Seclion (VS) Rererence: Slot- (O.OON,O.OOE)
Mearored Depth Relèreoce: S-i'Id Dev 72.00
Calculation MethxI: MiDirDIm a.v.nre
All TVD depths are
ssTVD plus 72'for RKBE.
3600-
3900-
c
2
~
õ..
Ö
~
t:
>
'" 4200
2
!-
4500
300
.9:::~~~~
~
~
#,
~
I~
1#
,I
I
;I
I
.I
;
I
#'#
7'
600
900
SURVEY PROGRAM
Depth Fm Depth To SurveyIPIan
4827.00 807229 Planœd: MI'S-23L1 "'1'02 VI
Plan: MPS-23Ll wp02 (plan MPS-23/Plan MPS-23Ll)
Tool
MWD+IFR+MS
Creoled By: Ken AlIm
Checked:
Dale: 3/29/2002
Thlle:
Reviewed:
Date:
Name
+N/oS
+F1.W
NorIhing
Easling
Latitude
Longitude SIoI
Plan MPS.23
-13.24 -587.14 5999959.55
565758.06 70"24'37.198N 149"27'S2J80W N/A
TARGET DETAILS
Name 1VD +N/oS +F1-W Northing EasIir1g Shape
MPS-23LI T6 4192.00 -2707.88 -1367.08 5997240.00 S64415.00 Poin'
MPS-23L1 T3 4197.00 -1274.27 -175451 5998670.00 S64015.00 Pain'
MPS-23LI T2 4202.00 -31559 -1591.05 5999630.00 564170.00 Point
MI'S-23LI IS 4207.00 -2276.58 -150830 5997670.00 564270.00 Point
MPS-23LI T4 4219.00 -2116.04 -1566.90 5997830.00 564210.00 Point
SECTION DErAILS
See MD Ine Azi TVD +N/-S +FJ-W DLeg TFaee VSee Target
1 4827.00 72.07 223.28 4207.23 369.88 -1269.02 0.00 0.00 241.73
2 4993.08 92.00 223.28 4230.12 250.74 -1381.20 12.00 0.00 398.65
3 5297.50 92.90 192.82 4216.81 -14.51 -1522.55 10.00 -87.69 699.13
4 5567.38 92.90 192.82 4203.18 -277.33 -1582.35 0.00 0.00 960.69
5 5606.63 90.54 192.82 4202.00 -315.59 -1591.05 6.00 179.95 998.77 MPS-23L1 T
6 5609.68 90.54 192.64 4201.97 -318.56 -1591.72 6.00 -90.13 1001.73 .---
7 6271. 70 90.54 192.64 4195.74 -964.52 -1736.55 0.00 0.00 1643.63
8 6583.37 89.00 174.00 4197.00 -1274.27 -1754.51 6.00 -94.72 1928.25 MPS-23L1 T3
9 6688.15 88.15 167.77 4199.61 -1377.65 -1737.93 6.00 -97.81 2013.06
10 7296.42 88.15 167.77 4219.20 -1971.80 -1609.12 0.00 0.00 2485.39
11 7446.86 92.00 159.60 4219.00 -2116.04 -1566.90 6.00 -64.82 2595.13 MPS-23L1 T4
12 7492.15 94.72 159.60 4216.35 -2158.41 -1551.14 6.00 -0.07 2625.85
13 7565.34 94.72 159.60 4210.33 -2226.77 -1525.71 0.00 0.00 2675.41
14 7618.21 92.50 161.87 4207.00 -2276.58 -1508.30 6.00 134.27 2712.Q3 MPS-23L1 T5
15 7628.44 91.89 161.87 4206.61 -2286.29 -1505.12 6.00 -180.00 2719.27
16 8072.29 91.89 161.87 4192.00 -2707.88 -1367.08 0.00 0.00 3033.40 MPS-23L1 T6
CASING DETAILS
No. TVD MD Name Size
4192.00 8072.28 4112" 4.500
FORMATION TOP DETAILS
No. TVDPath MDPath Fonnation
4213.60 4849.32 OA
'lJ
/
--
1200
1500
1800
2100
2400
2700
3000
Vertical Section at 206.790 [300ft/in]
bp
0
COMPANY DETA'U;
REFERENCE INFORMA nON
SURVEY PROGRAM
Depth Fm Deplb To S¡r,oeylPlan
Tool
MWD+IFR+MS
OP Amoco
Û><><dÍnale (NJE) Relërence: Wen Ceo!re: Plan MPS.23, True North
Verûcal (IVD) Rererenee: S-Pad Dev 72.00
Sectioo (VS) Rererence: Slot. (O.OON,O.OOE)
Measured Depth Relëreoœ: S-Pad Dev 72.00
Calculation Meth>d: MinímlÐ1 a.va...,
4827.00 8072.29 PIamed: Mps.23LI wp02 VI
C.IcuI.,ÍO!I Method: Minimom C\uva...,
~ ~=: ~~v~~AiodcrNorlh
r:rror Sur[>,.: Elliptical + Casing
Wamil11\ M<Ihcd: Ru/.... Uased
~
1:
0
~
:;
0
CI)
Name
Plan MPS.23
+NI-S
+FJ-W
500-
.13.24 .581.14 5999959.55
Plan: MPS.23L1 wp02 (Plan MPS.23/Plan MPS.23L1)
Created By: Ken Allen Date: 3/29/2002
Checked:
Dale:
Reviewed:
Date:
WELL DETAII.$
Notthing
Easting
Lat-
Loogilude Slot
565758.06 70024'37.198N 149'27'S2.380W NlA
TARGET DETAILS
Name 1VD +NI-S +FJ.W Northing Easting Shape
MPS-23LI T6 4192.00 .2707.88 .1367.08 5991240.00 564415.00 Point
MPS.23LI T3 4197.00 .1274.27 .1754.51 5998670.00 564015.00 Point
MPS-23L1 1'2 4202.00 .315.59 .1591.05 5999630.00 564110.00 Point
MPS-23LI T5 4207.00 .2276.58 .1508.30 5991610.00 564270.00 Point
SECTION DETAILS
See MD Ine Azi TVD +N/-S +FJ-W DLeg TFaee VSee Target
1 4827.00 72.07 223.28 4207.23 369.88 -1269.02 0.00 0.00 241.73
2 4993.08 92.00 223.28 4230.12 250.74 -1381.20 12.00 0.00 398.65
3 5297.50 92.90 192.82 4216.81 -14.51 -1522.55 10.00 -87.69 699.13
4 5567.38 92.90 192.82 4203.18 -277.33 -1582.35 0.00 0.00 960.69
5 5606.63 90.54 192.82 4202.00 -315.59 -1591.05 6.00 179.95 998.77 MPS-23L1 T2
6 5609.68 90.54 192.64 4201.97 -318.56 -1591.72 6.00 -90.13 1001.73
7 6271.70 90.54 192.64 4195.74 -964.52 -1736.55 0.00 0.00 1643.63 MPS-23L1 T3---
8 6583.37 89.00 174.00 4197.00 -1274.27 -1754.51 6.00 -94.72 1928.25
9 6688.15 88.15 167.77 4199.61 -1377.65 -1737.93 6.00 -97.81 2013.06
10 7296.42 88.15 167.77 4219.20 -1971.80 -1609.12 0.00 0.00 2485.39
11 7446.86 92.00 159.60 4219.00 -2116.04 -1566.90 6.00 -64.82 2595.13 MPS-23L1 T4
12 7492.15 94.72 159.60 4216.35 -2158.41 -1551.14 6.00 -0.07 2625.85
13 7565.34 94.72 159.60 4210.33 -2226.77 -1525.71 0.00 0.00 2675.41
14 7618.21 92.50 161.87 4207.00 -2276.58 -1508.30 6.00 134.27 2712.03 MPS-23L1 T5
15 7628.44 91.89 161.87 4206.61 -2286.29 -1505.12 6.00 -180.00 2719.27
16 8072.29 91.89 161.87 4192.00 -2707.88 -1367.08 0.00 0.00 3033.40 MPS-23L1 T6
FORMATION TOP DETAILS
No. TVDPath MDPath Fonnation
1 4213.60 4849.32 OA
CASING DETAILS
No. TVD MD Name Size
4192.00 8072.28 41/2" 4.500
.500
All TVD depths are
ssTVD plus 72'for RKBE.
I -1000
-1500
~
II
IgP
I
I
I
I
I
~
I
ø'#
l'
~~?< ~
.;~;:~ ~~
#,~
-2000
I I
-1000
Wesl{-)Æast{+) [500ft/in]
I
-500
I
0
-1500
.~
)
BP
My Planning Report
Company: BP Amoco
Field: Milne Point
Site: M Pt S Pad
Well: Plan MPS-23
Wellpath: Plan MPS-23L 1
Date: 3/29/2002 Time: 08:31 :21 Page:
Co-ordinate(NE) Reference: Well: Plan MPS-23, True North
Vertical (rVD) Reference: S-Pad Dev 72.0
SeCtion (VS) Reference: Well (0.00N,0.00E,206.79Azi)
Survey Calculation Method: Minimum Curvature Db:
Oracle
Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Field:
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
Site:
M Pt S Pad
Site Position:
From: Map
Position Uncertainty:
Ground Level:
Northing: 5999978.00 ft
Easting: 566345.00 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 24 37.329 N
149 27 35.171 W
True
0.51 deg
0.00 ft
0.00 ft
Well:
Plan MPS-23
Slot Name:
Well Position:
+N/-S -13.24 ft Northing: 5999959.55 ft
+E/-W -587.14 ft Easting: 565758.06 ft
Position Uncertainty: 0.00 ft
Latitude:
Longitude:
70 24 37.198 N
149 27 52.380 W
Wellpath: Plan MPS-23L 1
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Plan MPS-23
4827.00 ft
Mean Sea Level
26.03 deg
80.79 deg .
Direction
deg
206.79
3/27/2002
1
From: Definitive Path
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
S-Pad Dev
3/26/2002
57471 nT
Depth From (TVD)
ft
0.00
Height 72.00 ft
Plan:
MPS-23L 1 wp02
Date Composed:
Version:
Tied-to:
Principal: Yes
Casing Points
TVD. ..DiaD1~t~r . . Hole Size .
'ft ....in. . .in .
8072.28 4192.00 4.500 6.750
41/2"
Plan Section Information
. MD Incl. . )Azim. TVD. *Nï~s. ..+E/~W ..DLS .. . Iluild Turn. ... T,FO .. T~rget
ft deg. 'deg. ft. ft. ft ~eg/1 pOft deg/tOOft deg/10qft. ..deg
4827.00 72.07 223.28 4207.23 369.88 -1269.02 0.00 0.00 0.00 0.00
4993.08 92.00 223.28 4230.12 250.74 -1381.20 12.00 12.00 0.00 0.00
5297.50 92.90 192.82 4216.81 -14.51 -1522.55 10.00 0.29 -10.01 -87.69
5567.38 92.90 192.82 4203.18 -277.33 -1582.35 0.00 0.00 0.00 0.00
5606.63 90.54 192.82 4202.00 -315.59 -1591.05 6.00 -6.00 0.00 179.95 MPS-23L 1 T2
5609.68 90.54 192.64 4201.97 -318.56 -1591.72 6.00 -0.01 -6.00 -90.13
6271.70 90.54 192.64 4195.74 -964.52 -1736.55 0.00 0.00 0.00 0.00
6583.37 89.00 174.00 4197.00 -1274.27 -1754.51 6.00 -0.49 -5.98 -94.72 MPS-23L 1 T3
6688.15 88.15 167.77 4199.61 -1377.65 -1737.93 6.00 -0.81 -5.95 -97.81
7296.42 88.15 167.77 4219.20 -1971.80 -1609.12 0.00 0.00 0.00 0.00
7446.86 92.00 159.60 4219.00 -2116.04 -1566.90 6.00 2.56 -5.43 -64.82 MPS-23L 1 T 4
7492.15 94.72 159.60 4216.35 -2158.41 -1551.14 6.00 6.00 -0.01 -0.07
7565.34 94.72 159.60 4210.33 -2226.77 -1525.71 0.00 0.00 0.00 0.00
7618.21 92.50 161.87 4207.00 -2276.58 -1508.30 6.00 -4.19 4.30 134.27 MPS-23L 1 T5
7628.44 91.89 161.87 4206.61 -2286.29 -1505.12 6.00 -6.00 0.00 -180.00
8072.29 91.89 161.87 4192.00 -2707.88 -1367.08 0.00 0.00 0.00 0.00 MPS-23L 1 T6
)
BP
My Planning Report
')
Targets
Map Map <- Latitude --> <- Longitude ->
Name Description TVD +N/-S +E/- W Northing Easting Deg Min See Deg Min See
Dip. Dir. ft ft ft ft ft
MPS-23L 1 T6 4192.00 -2707.88 -1367.08 5997240.00 564415.00 70 24 10.565 N 149 28 32.435 W
MPS-23L 1 T3 4197.00 -1274.27 -1754.51 5998670.00 564015.00 70 24 24.664 N 149 28 43.797 W
MPS-23L 1 T2 4202.00 -315.59 -1591.05 5999630.00 564170.00 70 24 34.093 N 149 28 39.013 W
MPS-23L 1 T5 4207.00 -2276.58 -1508.30 5997670.00 564270.00 70 24 14.807 N 149 28 36.576 W
MPS-23L 1 T 4 4219.00 -2116.04 -1566.90 5997830.00 564210.00 70 24 16.386 N 149 28 38.294 W
Survey
4827.00 72.07 223.28 4207.23 4135.23 6000318.21 564485.95 241.73 0.00 Start Dir 12/100' : 4827' MD,
4850.00 74.83 223.28 4213.78 4141.78 6000302.03 564470.98 262.87 12.00 MWD+IFR+MS
4875.00 77.83 223.28 4219.69 4147.69 6000284.20 564454.49 286.16 12.00 MWD+IFR+MS
4900.00 80.83 223.28 4224.31 4152.31 6000266.17 564437.81 309.71 12.00 MWD+IFR+MS
4925.00 83.83 223.28 4227.65 4155.65 6000247.99 564420.99 333.47 12.00 MWD+IFR+MS
4950.00 86.83 223.28 4229.68 4157.68 6000229.70 564404.07 357.36 12.00 MWD+IFR+MS
4975.00 89.83 223.28 4230.41 4158.41 6000211.36 564387.11 381.32 12.00 MWD+IFR+MS
4993.08 92.00 223.28 4230.12 4158.12 6000198.10 564374.83 398.65 12.00 Start Dir 10/100' : 4993.08' M
5000.00 92.03 222.58 4229.88 4157.88 6000192.99 564370.17 405.29 10.00 MWD+IFR+MS
5050.00 92.22 217.58 4228.03 4156.03 6000154.49 564338.34 453.90 10.00 MWD+IFR+MS
5100.00 92.39 212.58 4226.01 4154.01 6000113.38 564310.00 503.32 10.00 MWD+IFR+MS
5150.00 92.55 207.58 4223.85 4151.85 6000069.95 564285.36 553.18 10.00 MWD+IFR+MS
5200.00 92.69 202.58 4221.57 4149.57 6000024.55 564264.59 603.09 10.00 MWD+IFR+MS
5250.00 92.80 197.57 4219.17 4147.17 5999977.51 564247.87 652.67 10.00 MWD+IFR+MS
5297.50 92.90 192.82 4216.81 4144.81 5999931.64 564235.84 699.13 10.00 End Dir : 5297.5' MD, 4216.81
5300.00 92.90 192.82 4216.68 4144.68 5999929.20 564235.31 701.56 0.00 MWD+IFR+MS
5400.00 92.90 192.82 4211.63 4139.63 5999831.63 564214.01 798.47 0.00 MWD+IFR+MS
5500.00 92.90 192.82 4206.58 4134.58 5999734.06 564192.72 895.39 0.00 MWD+IFR+MS
5567.38 92.90 192.82 4203.18 4131.18 5999668.33 564178.37 960.69 0.00 Start Dir 6/100' : 5567.38' MD
5600.00 90.94 192.82 4202.09 4130.09 5999636.48 564171.41 992.33 6.00 MWD+IFR+MS
5606.63 90.54 192.82 4202.00 4130.00 5999630.00 564170.00 998.77 6.00 MPS-23L 1 T2
5609.68 90.54 192.64 4201.97 4129.97 5999627.02 564169.35 1001.73 6.00 End Dir : 5609.68' MD, 4201.9
5700.00 90.54 192.64 4201.12 4129.12 5999538.73 564150.37 1089.30 0.00 MWD+IFR+MS
5800.00 90.54 192.64 4200.18 4128.18 5999440.98 564129.36 1186.26 0.00 MWD+IFR+MS
5900.00 90.54 192.64 4199.24 4127.24 5999343.23 564108.35 1283.22 0.00 MWD+IFR+MS
6000.00 90.54 192.64 4198.30 4126.30 5999245.47 564087.33 1380. 19 0.00 MWD+IFR+MS
6100.00 90.54 192.64 4197.35 4125.35 5999147.72 564066.32 1477.15 0.00 MWD+IFR+MS
6200.00 90.54 192.64 4196.41 4124.41 5999049.97 564045.30 1574.11 0.00 MWD+IFR+MS
6271.70 90.54 192.64 4195.74 4123.74 5998979.87 564030.23 1643.63 0.00 Start Dir6/100': 6271.7' MD,
6300.00 90.40 190.94 4195.50 4123.50 5998952.13 564024.70 1670.96 6.00 MWD+IFR+MS
6350.00 90.15 187.96 4195.26 4123.26 5998902.75 564016.92 1718.69 6.00 MWD+IFR+MS
6400.00 89.90 184.97 4195.24 4123.24 5998853.03 564011.74 1765.57 6.00 MWD+IFR+MS
6450.00 89.66 181.98 4195.43 4123.43 5998803.11 564009.15 1811.48 6.00 MWD+IFR+MS
6500.00 89.41 178.99 4195.84 4123.84 5998753.12 564009.17 1856.29 6.00 MWD+IFR+MS
6550.00 89.16 176.00 4196.46 4124.46 5998703.20 564011.80 1899.89 6.00 MWD+IFR+MS
6583.37 89.00 174.00 4197.00 4125.00 5998670.00 564015.00 1928.25 6.00 MPS-23L 1 T3
6600.00 88.86 173.01 4197.31 4125.31 5998653.50 564017.03 1942.15 6.00 MWD+IFR+MS
6650.00 88.46 170.04 4198.48 4126.48 5998604.13 564024.83 1982.96 6.00 MWD+IFR+MS
6688.15 88.15 167.77 4199.61 4127.61 5998566.78 564032.50 2013.06 6.00 End Dir : 6688.15' MD, 4199.6
6700.00 88.15 167.77 4199.99 ; 4127.99 5998555.23 564035.11 2022.26 0.00 MWD+IFR+MS
I t,"", ~
)
BP
My Planning Report
)
. ...... ..
.;qP~Pâ~Y;, ~PAn1oqd .
. . .. Milrle Pijiht
... MA(sea~ '.
., ... . ... Plan MPS+23. . ..
êât~~, Pla~::~PS:'23L1
Survey
. .~ ~: :;. :
. ..
:.~a~\~~rJW~t:;J~~~r~~~~~]~~23i~~:No~~:.
::~:W~;~~r]~f~~~~e~:~~?d:.. ..~~I¡~~~Ögü~~~~;P9?9Až~b:.
6800.00 88.15 167.77 4203.21 4131.21 5998457.75 564057.14 2099.91 0.00 MWD+IFR+MS
6900.00 88.15 167.77 4206.43 4134.43 5998360.27 564079.17 2177.56 0.00 MWD+IFR+MS
7000.00 88.15 167.77 4209.65 4137.65 5998262.79 564101.20 2255.22 0.00 MWD+IFR+MS
7100.00 88.15 167.77 4212.87 4140.87 5998165.31 564123.24 2332.87 0.00 MWD+IFR+MS
7200.00 88.15 167.77 4216.10 4144.10 5998067.83 564145.27 2410.52 0.00 MWD+IFR+MS
7296.42 88.15 167.77 4219.20 4147.20 5997973.85 564166.51 2485.39 0.00 Start Oil' 6/100' : 7296.42' MD
7300.00 88.25 167.57 4219.31 4147.31 5997970.36 564167.31 2488.17 6.00 MWD+IFR+MS
7350.00 89.52 164.86 4220.29 4148.29 5997921.92 564179.65 2526.14 6.00 MWD+IFR+MS
7400.00 90.80 162.14 4220.15 4148.15 5997874.12 564194.26 2562.53 6.00 MWD+IFR+MS
7446.86 92.00 159.60 4219.00 4147.00 5997830.00 564210.00 2595.13 6.00 MPS-23L1 T4
7450.00 92.19 159.60 4218.89 4146.89 5997827.07 564211.12 2597.26 6.00 MWD+IFR+MS
7492.15 94.72 159.60 4216.35 4144.35 5997787.77 564226.13 2625.85 6.00 End Dir : 7492.15' MD, 4216.3
7500.00 94.72 159.60 4215.70 4143.70 5997780.47 564228.92 2631.16 0.00 MWD+IFR+MS
7565.34 94.72 159.60 4210.33 4138.33 5997719.65 564252.16 2675.41 0.00 Start Dir 6/100' : 7565.34' MD
7600.00 93.26 161.09 4207.92 4135.92 5997687.19 564264.07 2699.24 6.00 MWD+IFR+MS
7618.21 92.50 161.87 4207.00 4135.00 5997670.00 564270.00 2712.03 6.00 MPS-23L 1 T5
7628.44 91.89 161.87 4206.61 4134.61 5997660.31 564273.27 2719.27 6.00 End Dir : 7628.44' MD, 4206.6
7700.00 91.89 161.87 4204.25 4132.25 5997592.55 564296.12 2769.91 0.00 MWD+IFR+MS
7800.00 91.89 161.87 4200.96 4128.96 5997497.85 564328.05 2840.69 0.00 MWD+IFR+MS
7900.00 91.89 161.87 4197.67 4125.67 5997403.15 564359.98 2911.46 0.00 MWD+IFR+MS
8000.00 91.89 161.87 4194.38 4122.38 5997308.46 564391.92 2982.24 0.00 MWD+IFR+MS
8072.29 91.89 161.87 4192.00 4120.00 5997240.00 564415.00 3033.40 0.00 MPS-23L 1 T6
i 206924
DATE
INVOICE I CREDIT MEMO
5/13/02 CK052302G
/
-YY\P5 -13 ~ ~ I
ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
PAY
')
DESCRIPTION
Permit To Dril~ Fee
GROSS
Pls call Terrie Hubble X4628
TOTAL ~
DATE
)
OS/28/02
56"389
4'12
8' ...........p........... ~.'y....r..'" ....[.,.., "dUh l.fl/b~ ..(.....}. f,.ql.I..(...,.t...I.,
. ,.. ... Ii.. .. l I .¡' ...1...,. tl."
.. ~..... . .. . ,.1 .... "",i "11111 UIII.'- .,; ",
TO THE
ORDER
OF
Alaska Oil & Gas
Conservation Commiss.ion
333 W 7th Ave, StelQO
AnchQrage,AK 99501
VENDOR
DISCOUNT
CHECK NO.
H206924
NET
$100.00
$100.00
FIRST NATIONAL BANK .OF ASHLAND
AN AFFlUATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H 20 S 924
DATE..
CONSOLIDATED COMMERCIAL ACCOUNT
AMOUNT
***May 28, 2002*** *****$100.00****** .
NorVALlD AFTER. 120 DAYS
III 2 0 b '1 2'" III I: 0... ~ 2 0 j a '1 5 I: 0 0 a ...... ~ '1111
(4i<:---~i< 'i Ii
\.'~()~'J.Q
,
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
v
DEVELOPMENT
REDRILL
EXPLORATION
INJECTION WELL
INJECTION WELL
RED RILL
Rev: 5/6/02
C\jody\templates
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
,
\,
)
WELL NAME #,PS-2- 5'
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If API number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
"CLUE"
The permit is for a new wellbore segment of existing well
-' Permit No, API No.
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(t), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
ANNULAR DISPOSAL Please note that an disposal of fluids generated. . .
INTO ANNULUS OF
ANOTHER WELL ON
SAME PAD
<->
SPACING EXCEPTION
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Companv Name) will assume the liability of any protest to
the spacing exception that may occur.
WELLPERMITCHECKLlST COMPANY ßPX WELLNAME/7PL\-?.$ PROGRAM: Exp- DevK Redrll- Se~- Wellboreseg- Ann.disposalparareq-
FIELD & POOL ,f'/J.<5/¿¡t'J INITCLASS //P.v /-~.// GEOLAREA r;7t1 UNIT# II ~2.. t' ON/OFF SHORE OAJ .
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . R N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . I Y N
3. Unique well name and number. .. . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y , N
6. Well located proper distance from other wells.. . . . . . . . . Y , N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated. is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
A~. AE R ]~T~ } 12. Permit can be issued without administrative approval.. . . . . N
"frl". r ~/ðZ.- 13. Can permit be approved before 15-day wait.. . . . . . . . . . N
ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . N '20'1 @ i' ~ t
15. Surface casing protects all known USDWs. . . . . . . . . . . N
16. CMT vol adequate to circulate on conductor & surf csg. . . . . æ. N
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . -¥-* All A- .
18. CMT will cover aU known Productiv.e horizons. . . . . . . . . . ~y iD S¡,pt.k' [, A..£y
19. Casing designs adequate for C. T, B & permafrost. . . . . . . 'f;í
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N () tLljrw-- I ct/.
21. If a re-drill, has a 10-403 for abandonment been approved. . . .¥--N- /\LIlt
22. Adequate well bore separation proposed.. . . . . . . . . .-. . N
23. If diverter required. does it meet regulations. . . . . . . . . . N
24, Drilling fluid program schematic & equip list adequate. . . . . N
25. BOPEs. do they meet regulation. . . . . . . . . . . . . . . . N -h t
26. BOPE press rating appropriate; test to é./-Ovo psig. N ¡r/¿Ç() 14ii pi£' , tttty( C£¡ ~s 5S-0o f (.1.1,
27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
28. Work will occur without operation shutdown. . . . . . . . . . . N
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y c1V
GEOLOGY 30. Permit can be issued wlo hydrogen sulfide measures. . . . . fY}N
31. Data presented on potential overpressure zones. . . . . . . )VN /J
32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . . . . . Y ,/1.J¡ M .
~ß~ J>~TE} 33. Seabed condition survey (If off-shore). . . . . . . . . . . . . N
~rt'- .f-ý:2.,//ð/:- 34. Contact namelphone for weekly progress reports [exploratory on - Y N
ANNULAR DISPOSAL 35. With proper cementing records. this plan
(A) will contain waste in a suitable receiving zone; . . . . . . . Y N
(B) will not contaminate freshwater; or cause drilling waste. .. Y
to surface;
(C) will not impair mechanical integrity of the well used for disposal;
(D) will not damage producing formation or impair recovery from
pool; and
(E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION:
RP~ JDH .:.Jr COT.
WGA vJ6þY DTS (l~ f ?.:,s l () 'è
APPR DA T~
\e.i4k "{Wlo 1..
(
APPR DATE
~ 9~Þ¿
A~~-,q.
Comments/Instructions:
G:\geology\permits\checklist.doc
)
')
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Pennitting Process.
but is part of the history file.
To improve the readability of the Well History file and to
simplrty finding infonnation, infonnation of this
nature is accumulated at the end of the file under APPEN,DIX.
No special effort has been made to chronologically
organize this category of information.
')
a Cb}-13d
I / a r:5
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Nov 06 07:15:00 2002
Reel Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/11/06
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS
Writing Library. Scientific Technical Services
Tape Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/11/06
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing
Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-23
500292309800
BP Exploration (Alaska), Inc.
Sperry-Sun Drilling Services
06-NOV-02
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 1
AK-MW-22108
B. HENNINGSE
E. VAUGHN
MWDRUN 2
AK-MW-22108
B. HENNINGSE
E. VAUGHN
MWDRUN 3
AK-MW-22108
J. STRAHAN
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3293
253
MSL 0)
67.10
39.60
#
WELL CASING RECORD
1ST STRING
2ND STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.875 20.000 110.0
6.125 7.625 5224.0
)
3 RD STRING
PRODUCTION STRING
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1, 2, AND 3 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4).
4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 8/29/02. MWD DATA
ARE CONSIDERED
PDC.
5. MWD RUNS 1, 2, AND 3 REPRESENT WELL MPS-23 WITH
API#: 50-029-
23098-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF
8110'MD/4189'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum physical Record. .65535
File Type.... . . . . . . . . . . . .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
1
clipped curves; all bit runs merged.
.5000
START DEPTH
60.5
70.0
70.0
70.0
70.0
70.0
STOP DEPTH
8056.5
8063.5
8063.5
8063.5
8063.5
8063.5
)
ROP
$
110.5
8109.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED
PBU
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
BIT RUN NO MERGE TOP
1 60.5
2 2772.5
3 5234.5
MERGE BASE
2772.5
5234.5
8109.5
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 60.5 8109.5 4085 16099 60.5 8109.5
ROP MWD FT/H 1.4 1553.33 270.031 15999 110.5 8109.5
GR MWD API 11.95 134.53 71.4 15993 60.5 8056.5
RPX MWD OHMM 0.18 2000 279.083 15988 70 8063.5
RPS MWD OHMM 0.16 2000 235.055 15988 70 8063.5
RPM MWD OHMM 0.2 2000 188.84 15988 70 8063.5
RPD MWD OHMM 0.1 2000 156.035 15988 70 8063.5
FET MWD HOUR 0.05 58.81 0.731945 15988 70 8063.5
First Reading For Entire File......... .60.5
Last Reading For Entire File.......... .8109.5
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
)
F i 1 e Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
2
)
header data for each bit run in separate files.
1
.5000
START DEPTH
60.5
70.0
70.0
70.0
70.0
70.0
110.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
2722.0
2732.0
2732.0
2732.0
2732.0
2732.0
2772.5
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
30-JUN-02
Insite
66.37
Memory
2772.0
60.5
2722.0
.1
37.0
TOOL NUMBER
136694
151812
9.875
110.0
Spud Mud
9.30
250.0
7.5
1000
)
)
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
10.0
4.500
4.293
4.000
5.000
68.0
71.6
68.0
68.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
RPX MWD010 OHMM 4 1 68 12 4
RPS MWD010 OHMM 4 1 68 16 5
RPM MWD010 OHMM 4 1 68 20 6
RPD MWD010 OHMM 4 1 68 24 7
FET MWD010 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 60.5 2772.5 1416.5 5425 60.5 2772.5
ROP MWD010 FT/H 10.29 1553.33 337.992 5325 110.5 2772.5
GR MWD010 API 16.65 119.51 62.4946 5324 60.5 2722
RPX MWD010 OHMM 0.18 2000 799.878 5325 70 2732
RPS MWD010 OHMM 0.16 2000 665.672 5325 70 2732
RPM MWD010 OHMM 0.2 2000 519.559 5325 70 2732
RPD MWD010 OHMM 0.1 2000 406.189 5325 70 2732
FET MWD010 HOUR 0.05 1.69 0.266432 5325 70 2732
First Reading For Entire File......... .60.5
Last Reading For Entire File.......... .2772.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
3
)
header data for each bit run in separate files.
2
.5000
START DEPTH
2722.5
2732.5
2732.5
2732.5
2732.5
2732.5
2773.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (~T):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
5184.0
5193.5
5193.5
5193.5
5193.5
5193.5
5234.5
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
02-JUL-02
Insite
66.37
Memory
5234.0
2723.0
5183.5
32.6
88.1
TOOL NUMBER
136694
151812
9.875
110.0
Water
9.15
147.0
8.0
800
8.8
Based
)
')
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
5.000
3.356
6.000
5.000
70.0
107.6
70.0
70.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units. . . . . . . . . . .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2722.5 5234.5 3978.5 5025 2722.5 5234.5
ROP MWD020 FT/H 2.46 1251.83 291.269 4924 2773 5234.5
GR MWD020 API 11.95 118.61 70.2714 4924 2722.5 5184
RPX MWD020 OHMM 3.24 218.91 14.1011 4923 2732.5 5193.5
RPS MWD020 OHMM 3.3 251.85 14.2447 4923 2732.5 5193.5
RPM MWD020 OHMM 3.91 214.35 14.6176 4923 2732.5 5193.5
RPD MWD020 OHMM 4.5 179.02 15.2111 4923 2732.5 5193.5
FET MWD020 HOUR 0.05 7.76 0.546181 4923 2732.5 5193.5
First Reading For Entire File......... .2722.5
Last Reading For Entire File.......... .5234.5
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
File Type.. . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.004
,)
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name, . .
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
File Type............. . . . LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
4
)
header data for each bit run in separate files.
3
.5000
START DEPTH
5184.5
5194.0
5194.0
5194.0
5194.0
5194.0
5235.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
8056.5
8063.5
8063.5
8063.5
8063.5
8063.5
8109.5
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT
TEMPERATURE (DEGF)
05-JUL-02
Insite
66.37
Memory
8110.0
5181.0
8056.5
85.9
100.1
TOOL NUMBER
62456
73634
6.125
5224.0
FLO-PRO
9.20
49.0
8.5
38000
4.2
)
)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.100
.082
.100
.130
73.0
90.4
73.0
73.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5184.5 8109.5 6647 5851 5184.5 8109.5
ROP MWD030 FT/H 1.4 412.54 188.906 5750 5235 8109.5
GR MWD030 API 31.41 134.53 80.6201 5745 5184.5 8056.5
RPX MWD030 OHMM 0.23 1805.97 23.2076 5740 5194 8063.5
RPS MWD030 OHMM 0.27 1743.32 24.9525 5740 5194 8063.5
RPM MWD030 OHMM 0.26 2000 31.4559 5740 5194 8063.5
RPD MWD030 OHMM 4.95 2000 44.7475 5740 5194 8063.5
FET MWD030 HOUR 0.15 58.81 1.32313 5740 5194 8063.5
First Reading For Entire File......... .5184.5
Last Reading For Entire File.......... .8109.5
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.005
)
Physical EOF
Tape Trailer
Service name. . . . . . . . . . . . .LISTPE
Date.................... .02/11/06
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS
Reel Trailer
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/11/06
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS
Physical EOF
Physical EOF
End Of LIS File
)
Writing Library. Scientific Technical Services
Writing Library. Scientific Technical Services