Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-140
') )
Image Project Order File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
(~()a- J 4- 0 Order File Identifier
Organizing (done)
D Two-sided
1111111111111111111
0 Rescan Needed 11111111111111111
RES CAN
DI~TAL DATA
ø Diskettes, No. ~
D Other, No/Type:
OVERSIZED (Scannable)
D Maps:
D Color Items:
[J Greyscale Items:
D Other Items Scannable by
a Large Scanner
D Poor Quality Originals:
OVERSIZED (Non-Scannable)
D Other:
D Logs of various kinds:
NOTES:
Scanning Preparation
~
x 30 =
!e0 +
~
Date: g d-,Lf D4- /s/
I
! = TOTAL PAGES 0/
(Count d07S not rclude cover Sheet), P
Date: 15/:J..lf / D Lf /s/ m
1111111111111111111
D Other::¡ ,
Date8/J,tf OLJ- Isl mP
1111111111111111111
mP
BY:
Helen ~
Project Proofing
BY:
Helen ~
BY:
Helen ~~
Production Scanning
BY:
Helen~
Page Count from Scanned File: ~ 2, (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~ YES, NO
Date:~ J.S Dlf Isl iMP
I .
YES NO
Stage 1
Stage 1
BY:
If NO in stage 1, page(s) discrepancies were found:
Helen Maria
Date:
/s/
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Helen Maria
Date:
/s/
Comments about this file:
Quality Checked
I11II11111111111111
8/24/2004 Orders File Cover Page.doc
.
.
'~,-"
~··,····r····.····.···········'···'-'~····
;.iI¡ " . ,.
~, .~' ~
.. , ,.~ . , ......
,.,"'"
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc
ì ~ :L~:J '1
DATA SUBMITTAL COMPLIANCE REPORT
8/2/2004
Permit to Drill 2021400
Well Name/No. PRUDHOE BAY UN AURO S-113A
Operator BP EXPLORATION (ALASKA) INC
5E OA.-'~ J J vLl ~""t 1-
:4PI No. 50-029-2309 -01-00
----,--~-
MD 12640 '-'
NO 6990 y"
Completion Date 717/2002
Completion Status P&A
Current Status P&A
UIC N
-~---------
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
--~---- ---~-
- -- ---------
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, DEN, NEU
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/
Data Digital
Type Med/Frmt
[ED C
1
Electr
Dataset
Number Name
~266 See
Name
Interval
Start Stop
Log Log Run Interval OH/ .~.
Scale Media No Start Stop CH Received Comments
1 45 6989 Case 1117/2002 Digital Data: Dual Gamma
Ray, Electromagnetic
Wave Resistivity
10043 12640 Open 817/2002 MWD
An H2S Measurement is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 7/3/2002.
10043 12640 Open 817/2002
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 7/3/2002.
45 12591 Open 8/23/2002
-'"
45 12591 Open 8/23/2002
10043 12640 Open 817/2002 MWD
10043 12640 Open 817/2002
Sample
Set
Sent Received Number Comments
¿:::.-
0
Directional Survey
I
I
I
IV
I
I
Directional Survey
~.
ED 0
USVerification
/1 0983 LIS Verification
¡~t
I
I~' Directional Survey
Well Cores/Samples Information:
Directional'SurVØY
DATA SUBMITTAL COMPLIANCE REPORT
8/212004
Permit to Drill 2021400
Well Name/No. PRUDHOE BAY UN AURO S-113A
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23094-01-00
MD 12640
NO 6990
Completion Date 717/2002
Completion Status P&A
Current Status P&A
UIC N
ADDITIONAL INFORMATION
Well Cored? Y /0
Daily History Received?
dN
Chips Received? ~~
Formation Tops
.:\
Q)/N
Analysis
Received?
.~
.---------
Comments:
-
Compliance Reviewed By:
!~
Date: 16 ~ ~~~
".........../
To:
,')
)
WELL LOG TRANSMITTAL
State of Alaska
Alaska Oil and Gas Conservation Cornm.
Attn.: Lisa Weepie
33 3 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
September 26, 2002
RE: MWD Fonnation Evaluation Logs: S-113A AURORA,
S-113A AURORA:
Digital Log Images:
AK-MW-22095
1 CD Rom
aoa-tlJ}'-/o
l/a(af{J
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
Date:
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Signed~œ..(... OOr~
REceiVED
NOV 0 ~ ;;n."1'?
l L\I\.,,"
Alaska Oi~ & Gas Con~ t., .
An ',", -..,.,;mml3!ion
Ichorage
)
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well
0 Oil 0 Gas 0 Suspended 181 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface '~::';-::~:;,~',;:, ,
4542' NSL, 4496' WEL, SEC. 35, T12N, R12E, UM f "'.~:,~ I\}fi ~ '~t~~~Y
At top of productive interval '.Jf' ! :::", 11 ....~. ~"Wi
1246' NSL, 3048' WEL, SEC. 28, T12N, R12E, UM -=,7-. :.~:~?~:.~'.dZ:ï." ".: ... ,. ' '. fJIÐ...' .f. ...,'..
At total depth.r.Jj~.ED ~ ~'\i,.. '".-',
bk 1203' NSL, 3117' WEL, SEC. 28, T12N, R12E, UM -::~~::::.-.---:;: 1!'~ "è-o"
, &. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Senal'l"';,I'å. ,",,-,,'
KBE = 70.33' ADL 028258
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
7/3/2002 7/5/2002 7 fllfjOO2¡ù
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12640 6990 FT 9700 4912 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, RES, DEN, NEU
Classification of Service Well
7. Permit Number
202-140 302-210
8. API Number
50- 029-23094-01
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
9
\
S-113A
11. Field and Pool
Prudhoe Bay Field I Aurora Pool
(Undefined) ,
15. Water depth, if offshore 16. No. of Completions
N/A MSL Zero
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1900' (Approx.)
;>3.
CASING
SIZE
3411 X 2011
10-3/411
GRADE
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 115' 4211 260 sx Arctic Set (Approx.)
34' 5587' 13-1/211 784 sx Articset III Lite 3,750 sx 'G'
AMOUNT PULLED
WT. PER FT.
94#
45.5#
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
None
25.
SIZE
N/A
MD
TVD
TVD
MD
TUBING RECORD
DEPTH SET (MD)
PACKER SET (MD)
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11840' - 12640' P&A with 84 Bbls Class 'G'
9600' - 10025' Kick Off Plug with 51 Bbls Class 'G'
27.
Date First Production
Not on Production
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
N/A
PRODUCTION FOR OIL-BBL
TEST PERIOD
GAs-McF
WATER-BBL
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
Oll-BBl
GAs-McF
W ATER-BBl
CHOKE SIZE
GAS-Oil RATIO
Oil GRAVITY-API (CORR)
28.
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
No core samples were taken.
Gç
. ~ R B 0 M 5 B F l AUG 2 8 21N6bmit In Duplicate
Form 10-407 Rev. 07-01-80
Ii ,'I
')
)
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
Ugnu
6131'
3577'
Ugnu M Sands
8981'
4639'
Schrader Bluff N Sands
9572'
4865'
Schrader Bluff 0 Sands
9872'
4976'
Base Schrader I Top Colville 10530'
HRZ 12169'
Kuparuk C 12284'
LCU I Kuparuk B 12428'
Kuparuk A 12550'
5260'
6531'
6643'
6783'
6902'
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I ~erebY certify that the fO~ing ~s true and correct to the best of my knowledge
Signed Terrie Hubble /f 0 j\J\i.Jl . ~ Title Technical Assistant
S-113A 202-140 302-210
Well Number Permit No. I Approval No.
Date CB. /).k .O~
Prepared By Name/Number: Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Legal Name: 5-113
Common Name: 8-113
o;:o,o;~T..fDate Test Type
6/23/2002 LOT
Test-Depth (TMD)
5,587.0 (ft)
. .
-. - -
Bp:EXP:LORATrÖN.~
- - .-
,. - - - - - ,
. .
L~ak~gfrT~~st:Slltrlnlalj
Test Depth (TVD) -
3,371.0 (ft)
AMW.
9.40 (ppg)
Surface Pressure .' Leak Off Pressure (BHP)
1,220 (psi) 2,866 (psi)
Page 1 . of 1
EMW
16.37 (ppg)
~
~
'-
Printed: 7/1512002 8:52:25 AM
)
)
P~ge1 of 11
BPEXPLORA TION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
8-113
8-113
DRILL +COMPLETE
DOYON
DOYON 14
Start: 6/16/2002
Rig Release: 7/13/2002
Rig Number:
8pud Date: 6/17/2002
End: 7/13/2002
Date
From- To Hours Task Code NPT Phase
Description of Operations
6/15/2002
18:00 - 00:00
6.00 MOB
6/16/2002
00:00 - 07:30
07:30 - 18:00
18:00 - 21:00
7.50 MOB N
10.50 MOB P
3.00 MOB P
6/17/2002
21:00 - 23:00 2.00 MOB P
23:00 - 23:30 0.50 MOB P
23:30 - 00:00 0.50 MOB P
00:00 - 06:30 6.50 MOB P
06:30 - 07:30 1.00 MOB P
07:30 - 14:00 6.50 MOB P
14:00 - 16:00 2.00 MOB P
16:00 - 16:30 0.50 MOB P
16:30 - 17:00 0.50 MOB P
17:00 - 00:00 7.00 MOB P
00:00 - 01 :30 1.50 DRILL P
01 :30 - 22:30 21.00 DRILL P
6/18/2002
22:30 - 23:30 1.00 DRILL P
23:30 - 00:00 0.50 DRILL P
6/19/2002 00:00 - 02:00 2.00 DRILL P
02:00 - 02:30 0.50 DRILL P
02:30 - 20:30 18.00 DRILL P
20:30 - 21:30 1.00 DRILL P
21 :30 - 23:00 1.50 DRILL P
p
SURF
RREP SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
23:00 - 23:30 0.50 DRILL P SURF
23:30 - 00:00 0.50 DRILL P SURF
6120/2002 00:00 - 20:00 20.00 DRILL P SURF
Jack back rig floor. Move Rig off well. Remove BOP from
Cellar and place in transport rack. PU rig mats and Herculite.
Install back boosters. Install goose neck and front boosters.
Trouble shoot and repair front booster steering.
Repair steering on front booster tires.
Mob rig from W pad to S pad.
RD back booster tires. PU BOP stack and adapter, SB in BOP
bay. PU mouse hole. RU cellar doors. PU surface stack and
hang in cellar.
Spot rig over hole and shim.
Skid rig floor fOlWard.
NU Diverter Stack.
NU Diverter System. Take on Mud. RU drill floor. Load pipe
shed with 5" DP, BHA and strap.
Function Test Diverter. Test waived by AOGCC Chuck
Schieve.
PU 5" DP & HWDP. Rack back in derrick.
MU BHA #1: Bit, Mud Mtr, Fit sub, IBS, NM Flex DC, Hang off
sub, orienting sub, 2- NM Flex DC's, Jars, 20 - HWDP.
Fill stack, conductor, and flow line. Check for leaks. Pressure
test surface lines to 3000 psi.
Pre-spud safety meeting. RU slick line for Gyro.
Directionally drill surface hole from 115' - 479'. Gyro every 95'.
AST: 2.78 hrs, ART: 1.32 hrs, ADT: 4.1 hrs.
Viscosity of mud dropped & pump suctions plugging up.
Circulate and Condition mud.
Directionally drill f/479' - 1485'. Gyro every stand down to
960'. RD Gyro slick line. AST: 14.5 hr, ART: 0.32 hr, ADT:
14.82 hr.
Poor ROP & Build rate. Circulate prior to bit trip.
POOH.
POOH. LD orientating sub. Change out bit, stabilizer to 12
3/16" (from 123/8"), & MWD probe (for 500 - 650 gpm).
TIH. Tag bridge @ 560'. Wash through bridge and continue
TIH & wash last stand to bottom @ 1485'. 10' fill on bottom.
Directiionally drill f/1485' - 2970'. AST: 10.25 hr, ART 4.62
hr, ADT: 14.87 hr.
Circulate hole clean. Flow Check.
Short trip to 1335'. tight hole @ 1822' -1716', 1570' & 1550',
pull +1- 20k over. Tight hole @ 1534' - 1448', pull 50 k over.
NU Top Drive back ream 1530' -1430', 105 SPM, 1250 PSI.
Work thru tight spot several times. Pull dry to 1335'.
TIH. Tag @ 1550', work thru. Wash last stand to bottom @
2970'.
Directionally drill f/2970' - 2995'. AST: 0.25 hr ART: 0 hr,
ADT: 0.25 hr.
Directionally drill fl 2995' - 5600'. AST: 2.77 hr, ART: 11.46 hr,
ADT: 14.23 hr. Encountered gas cut mud(hydrates) after
drilling into the top of the SV2 formation. Picked up and
circulated for app. 20 minutes while observing well. Continued
to drill ahead while monitoring returns. Mud was cut from a 9.7
to 8.7. Once main influx reached surface, returns and flow were
normal and no futher indication of hydrates were seen while
Printed: 7/1512002 8:52:33 AM
)
)
BPEXPLORATION
0 ,
Operåti9"s:,.§...mm'a~.'~~pórt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
5-113
8-113
DRILL +COMPLETE
DOYON
DOYON 14
DatEr 0 'From -.To HòurS 'Task'CÓd$' NPi, o.Phase 0
. ".,' I; . I L I ',":'r
6/20/2002
00:00 - 20:00 20.00 DRILL P SURF
20:00 - 22:30 2.50 DRILL P SURF
22:30 - 00:00 1.50 DRILL P SURF
00:00 - 01 :00 1.00 DRILL P SURF
01 :00 - 02:30 1.50 DRILL P SURF
02:30 - 05:30 3.00 DRILL P SURF
05:30 - 07:00 1.50 DRILL P SURF
07:00 - 08:30 1.50 CASE P SURF
08:30 - 17:30 9.00 CASE P SURF
6/21/2002
17:30 - 20:30
3.00 CASE P
SURF
20:30 - 00:00
3.50 CEMT P
SURF
6/22/2002 00:00 - 00:30 0.50 CEMT P SURF
00:30 - 01 :30 1.00 CEMT P SURF
01 :30 - 02:00 0.50 DIVRTR P SURF
02:00 - 03:00 1.00 DIVRTR P SURF
03:00 - 03:30 0.50 WHSUR P SURF
03:30 - 06:30 3.00 BOPSU" P SURF
06:30 - 11 :30 5.00 BOPSU" P SURF
11 :30 - 12:00 0.50 BOPSUR P SURF
12:00 - 14:00 2.00 DRILL P SURF
14:00 - 18:00 4.00 DRill P PROD1
18:00 - 23:00
5.00 DRILL P
PROD1
Page.2 of 11
~ .¡
Start: 6/16/2002
Rig Release: 7/13/2002
Rig Number:
Spud Date: 6/17/2002
End: 7/13/2002
\. I.
, 0 Description ..ófOperations
drilling the well to surface TD.
Circulate hole clean and condition mud to 9.8 ppg, 175 Vis.
Circulate @ 650 gpm, 2700 psi, 80 rpm.
POOH for wiper trip to 2700'. Hole slick.
TIH to bottom @ 5600'. Wash last stand to bottom. No fill.
Hole slick.
Circulate and condition mud for casing run. Vis: 150 in, 225
out. MW: 9.8 in, 9.8 out.
TOOH. SLM no correction. Tight @ 381'. Wipe out tight spot.
Stand back HWDP, Flex Jts, Jars. LD mud motor, Stabilizer,
UBHO, Bit, & float sub.
Clear rig floor. RU casing tools and equipment: Fill-up tool,
350T slip type elevators and slips, power tongs& working
platform.
TIH with 135 jts, 10.75", L-80, BTC casing, Float shoe, Float
collar, TAM Port collar, and casing hanger. PU landing jt.
Start pumps @ 6 bpm and wash to bottom. Land hanger in
well head. Casing shoe @ 5587'.
Circulate and condition mud @ 9 BPM, 800 psi, while
reciprocating casing 15'. Load Top & Bottom plug in cement
head. NU Cement head and lines. Final mud properties: YP
21, Vis 82, MW 9.6. Final bottoms up @ 13 bpm, 820 psi.
PJSM for cement job.
Switch to Dowell pumps. Pump 5 bbls water. Test lines to
3,500 psi. Pump 75 bbls 10.2 ppg Mud Push wI dye @ 6 bpm,
500 psi. Drop bottom plug. Mix and pump 620 bbl (784 sxs)
"G" ArcticSet 3 - Lite Lead cement @ 8 bpm, 820 psi. Mix and
pump 155 bbls (750 sxs) "G" Tail Cement @ 8 bpm, 1100 psi.
Drop Top plug. Clear Dowell lines with 10 bbl water. Switch to
rig pumps and displace cement with 515 bbls 9.6 ppg Mud @
13 bpm, 1450 Max pressure. Slow pumps to 2 bpm. Bump
plug to 1500 psi (@ 00:17 hr, 06-22-02). Reciprocated casing
untill 90 bbls lead cement around shoe. Estimate 30 bbls
cement in returns.
Finish displacing cement. Bump plug to 1500 psi. Bleed
pressure & check floats.
RD cement head. LD landing jt. RD casing equipment.
PU stack washer and wash riser & diverter stack.
ND Diverter system.
NU Well head & test to 1000 psi.
NU BOP stack.
Test BOPE to 250 psi I low & 3500 psi I High for 5 min each
step. Change out two valves on Choke manifold. Test
witnessed by Lou Grimaldi AOGCC.
Pull test plug. ND test equipment. Set Wear bushing.
PU & TIH 45 jts 5" DP. POOH rack back in derrick.
PU BHA #3: Bit, Mud Mfr, Stabilizer, LWD, Hang off sub, NM
DC's, Jars, & HWDP. Upload MWD. Test adjustable stabilize
@ 650 gpm, 890 psi in, 1150 psi out. Surface test LWD I
MWD @ 600 gprn, 1540 psi.
TIH picking up singles from pipe shed. Rotate through TAM
port collar @ 984'. Test casing to 1000 psi after BHA through
TAM collar. Continue TIH with singles from pipe shed + 4
Printed: 7/1512002 8:52:33 NIo
')
)
BP;I:}(PlORATION
Qpé,.atiOI1$:'SurnmØryRepørt .
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
.0 Date
S-113
S-113
DRILL +COMPLETE
DOYON
DOYON 14
Page30f 11
Start: 6/16/2002
Rig Release: 7/13/2002
Rig Number:
Spud Date: 6/17/2002
End: 7/13/2002
6/22/2002
.Eråm'~To ~qurs. Task Code NPT
18:00 - 23:00 5.00 DRILL P PROD1
23:00 - 23:30 0.50 DRILL PROD1
23:30 - 00:00 0.50 DRILL P PROD1
00:00 - 01 :30 1.50 DRILL P PROD1
01 :30 - 04:00 2.50 DRILL P PROD1
6/23/2002
04:00 - 04:30 0.50 DRILL P PROD1
04:30 - 05:00 0.50 DRILL P PROD1
05:00 - 16:00 11.00 DRILL P PROD1
16:00 -17:00 1.00 DRILL P PROD1
17:00 - 19:30 2.50 DRILL P PROD1
19:30 - 20:30 1.00 DRILL P PROD1
20:30 - 22:00 1.50 DRILL P PROD1
22:00 - 00:00 2.00 DRILL P PROD1
6/24/2002 00:00 - 14:30 14.50 DRILL P PROD1
14:30 - 15:30 1.00 DRILL P PROD1
15:30 - 21:30 6.00 DRILL P PROD1
21 :30 - 22:00 0.50 DRILL P PROD1
22:00 - 23:00 1.00 DRILL P PROD1
23:00 - 23:30 0.50 DRILL P PROD1
23:30 - 00:00 0.50 DRILL P PROD1
6/25/2002 00:00 - 01:30 1.50 DRILL P PROD1
01 :30 - 02:00 0.50 DRILL P PROD1
02:00 - 03:00 1.00 DRILL P PROD1
03:00 - 06:00 3.00 DRILL P PROD1
06:00 - 06:30 0.50 DRILL P PROD1
06:30 - 07:30 1.00 DRILL P PROD1
07:30 - 09:00 1.50 DRILL P PROD1
09:00 - 10:30 1.50 DRILL P PROD1
10:30 - 12:00 1.50 DRILL P PROD1
12:00 - 20:00 8.00 DRILL P PROD1
20:00 - 20:30 0.50 DRILL P PROD1
20:30 - 21 :30 1.00 DRILL P PROD1
21 :30 - 00:00 2.50 DRILL P PROD1
Ð~~çriptiqn ()fQperations
stands from derrick. Tag top of cement @ 5491'. Picked up
total 60 stands DP (Total 110 stands DP in hole + derrick).
Circulate bottoms up.
Slip & cut drill line.
RU test equipment and test 10.75" casing to 3500 psi 130 min.
Drill float collar, shoe track, & float shoe. Clean old hole to TO
@ 5600'. Drill 20' of new formation to 5620'. Displace well to
new 9.4 ppg LSND mud system while drilling float equipment.
Circulate and condition mud for LOT.
LOT. 9.4 ppg MW, 3371' lVD, 1220 psi leak off. EMW =
16.35 ppg.
Establish baseline ECD = 10.13 ppg. Directionally drill f/5620'
- 7324'. Pump sweeps every 500 ft. or as hole dictates.
Sweeps bringing additional cuttings back.
CBU with sweep.
Wiper trip to 10.75" casing shoe. Tight @ 6230'. Pump out fl
5890' - 5690' due to swabbing. Pull into casing shoe.
Repair Top Drive. Trouble shoot and adjust back-out pressure.
TIH. Tag up @ wash thru @ 6230', 6267', & 6469'. Tag and
work thru @ 6500'. Wash last stand to bottom @ 7324'.
Directionally drill f/7324' -7515'. Daily AST: 0.82 hrs, ART:
6.78 hrs, ADT: 7.6 hrs. ECD = 10.4 ppg.
Directionally drill f/7515' - 8384', AST: 0.5 hr, ART: 10.96 hr,
ADT: 11.36 hr. Unable to drill ahead with acceptable ROP.
Suspect bit damage. Torque at 18-19,000 while on bottom
drilling.
Circulate bottoms up and hole clean.
TOOH. Back ream f/7420' - 6941'. Hole swabbing and tight.
Stand back HWDP & DC's.
Down load MWD I LWD data.
LD PWD, LWD tools with stabilizer. Bit rung out with missing
cutters. Stabalizer above bit also damaged due to hard/sharp
formation or junk.
PU Bit #4 & BHA #4: Bit, Mud mtr, Adj Stab, Fit sub, Obi pin
sub, RLL string, MWD, LWD, De's, HWDP.
MU directional BHA, upload MWD
Surface test MWD, motor, AGS
PJSM, Load sources into MWD, trip in BHA to 830'
Trip in BHA, pick up DP, 1 x 1 from pipe shed, 105 jts
Trip in from derrick to 5587'
Rig service, slip I cut drilling line
Trip into 8324'
Orient, wash and work junk on bottom, back ream and
wash I work junk off bottom
Directional drill 9 7/8" production wellbore
From 8384' to 8572'
AST 0, ART 0.99, ADT 0.99
Directional drill from 8572' to 9542'
Circulate sweep, SPRs, flow check
Wiper trip from 9542' to 8300'
Wellbore in good condition
Directional drill from 9542' to 9830'
AST 2.32, ART 5.3, ADT 7.62
Printed: 7/1512002 8:52:33 AM
)
)
BPEXPlORATION'
, . . \.
I . . I .
'Opera~ion$..'.'''~l.Immé1ry'~øpørt
Page4'of 11
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-113
S-113
DRILL +COMPLETE
DOYON
DOYON 14
Start: 6/16/2002
Rig Release: 7/13/2002
Rig Number:
Spud Date: 6/17/2002
End: 7/13/2002
Date
From,~ToHour~i,Task ' ,cOde 'oNPT
I " :.1','",'1 ,l
DesçJjption of'qperations
6/26/2002
00:00 - 12:00
12.00 DRILL P
6/27/2002
12:00 -14:00 2.00 DRILL P
14:00 - 15:00 1.00 DRILL P
15:00 - 17:00 2.00 DRILL P
17:00 - 00:00 7.00 DRILL P
00:00 - 06:30 6.50 DRILL P
06:30 - 08:30 2.00 DRILL P
08:30 - 12:00 3.50 DRILL P
12:00 - 17:30 5.50 DRILL P
17:30 - 18:30 1.00 DRILL P
18:30 - 20:30 2.00 DRILL P
20:30 - 00:00 3.50 DRILL P
00:00 - 11 :00 11.00 DRILL P
11 :00 - 12:30 1.50 DRILL P
12:30 - 16:30 4.00 DRILL P
16:30 - 17:30 1.00 DRILL P
17:30 - 21 :30 4.00 DRILL P
21 :30 - 00:00 2.50 DRILL P
6/28/2002
6/29/2002 00:00 - 01 :30 1.50 DRILL P
01 :30 - 02:00 0.50 DRILL P
02:00 - 08:00 6.00 DRILL P
08:00 - 09:00 1.00 DRILL P
09:00 - 10:30 1.50 DRILL P
10:30 -12:00 1.50 DRILL P
12:00 - 14:00 2.00 EVAL C
14:00 - 16:00 2.00 EVAL C
16:00 - 16:30 0.50 EVAL C
16:30 - 20:30 4.00 EVAL C
20:30 - 23:00 2.50 EVAL C
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Directional drill 9 7/8" production wellbore
From 9830' to 11,267'
AST 1.32, ART 6.63, ADT 7.95
Directional drill from 11,267' to 11,554' Adding lubricants to
control high torque. Current system has app. 3% of T.T. and
drilnslide.
Circulate sweep, surface to surface. No significant increase
in cuttings when sweep reached surface.
Wiper trip from 11,554' to 9449'
Wellbore in good condition
Directional drill from 11,554' to 12.254'
AST 2.93, ART 2.73, ADT 5.66
Directional drill 97/8" production wellbore
From 12,254' to 12,816'
Circulate and condition mud properties
Raise mud weight to 10.1 ppg
Directional drill from 12,816' to 13,087'
AST 1.5, ART 6.24, ADT 7.74
Directional drill from 13,087' to 13,566'
Circulate sweep surface to surface, no significant increase
in cuttings when sweep to surface
Wiper trip from 13,566' to 11,461'
Wellbore in good condition
Directional drill from 13,566' to 13,756'
AST 3.83, ART 2.73, ADT 6.56
Directional drill 97/8" production wellbore
From 13,791' to 14,440'
AST 0.66, ART 7.56, ADT 8.22
Circulate sweep surface to surface
Wiper trip from 14,440'~ to casing shoe at 5585'
Flow checks, pump slug, wellbore in good condition
Rig service, slip I cut drilling line
Service top drive
Trip in wellbore, wellbore in good condition
Fill pipe every 30 stands. No adverse hole conditions or fill
onTIH.
Circulate bottoms up, circulate and condition mud
properties for logging. Mud coming back heavy and high vis.
(up to 10.6 and 165.) Thin and treat with 3 ciculations.
Circulate and condition mud properties for logging
Flow check, pump slug, drop 2.25" drift
Trip out, SLM, no correction, wellbore in good condition
LD BHA, NMDCs, jars
MWD, PJSM, remove sources, download
LD BHA, MWD, motor, AGS
PU, MU MDT logging tool, function test
Trip in MDT on DP, control running speed, 5587'
Break circulation, hang sheave in derrick
Trip in to 13,400', control speed, fill pipe every 10
stands. No adverse hole conditions. Hole appears to be in
excellent shape.
Break circulation, 3 bpm at 600 psi, MU side entry sub,
run wireline to 13.412', wet connect, function test
Printed: 7/1512002 8:52:33 NA
)
BPEXPLORATION
. ,
. '. ,
Operatiops~'ul1'lJ11~ry.'FI~P()1"t
Legal Well Name: 8-113
Common Well Name: 8-113
Event Name: DRILL +COMPLETE
Contractor Name: DOYON
Rig Name: DOYON 14
, Qåttf.: "'Fron1'~To ' Hours'Ta$k COde NPT
¡
6/29/2002 23:00 - 00:00 1.00 EVAL C PROD1
6130/2002 00:00 - 09:30 9.50 EVAL C PROD1
09:30 - 10:30 1.00 EVAL C PROD1
10:30 - 11 :00 0.50 EVAL C PROD1
11:00 -16:00 5.00 EVAL C PROD1
Page 50f 11
Start: 6/16/2002
Rig Release: 7/13/2002
Rig Number:
Spud Date: 6/17/2002
End: 7/13/2002
16:00 - 19:30 3.50 EVAL C PROD1
19:30 - 21 :30 2.00 EVAL C PROD1
21 :30 - 22:00 0.50 EVAL C PROD1
22:00 - 23:30 1.50 EVAL C PROD1
23:30 - 00:00 0.50 STKOH C PROD1
7/1/2002 00:00 - 03:00 3.00 STKOH C PROD1
03:00 - 03:30 0.50 STKOH C PROD1
03:30 - 05:30 2.00 STKOH C PROD1
05:30 - 06:30 1.00 STKOH C PROD1
06:30 - 09:00 2.50 STKOH C PROD1
09:00 - 10:30 1.50 STKOH C PROD1
10:30 - 15:00 4.50 STKOH C PROD1
15:00 - 16:00 1.00 EVAL C PROD1
16:00 - 17:00 1.00 STKOH C PROD1
17:00 - 20:00 3.00 STKOH C PROD1
20:00 - 22:00 2.00 STKOH C PROD1
22:00 - 23:30 1.50 STKOH C PROD1
23:30 - 00:00 0.50 STKOH C PROD1
71212002 00:00 - 01 :00 1.00 STKOH C PROD1
01 :00 - 01 :30 0.50 STKOH C PROD1
01 :30 - 02:30 1.00 STKOH C PROD1
02:30 - 03:00 0.50 STKOH C PROD1
03:00 - 03:30 0.50 STKOH C PROD1
03:30 - 04:00 0.50 STKOH C PROD1
04:00 - 06:30 2.50 STKOH C PROD1
06:30 - 09:00 2.50 STKOH C PROD1
09:00 - 10:30 1.50 STKOH C PROD1
10:30 -11 :30 1.00 STKOH C PROD1
l:)escriptiqnofQperations
Trip in to 13,823', begin to log
Log wI Schlumberger, run MDT log. Recover Pressures and
samples in the Kuparuk at several different intemals. Hole in
good shape during logging operation.
Pull free from wet connect, POOH w/ wireline
LD side entry sub, rig down sheaves
Flow check, pump slug, improper hole fill, circulate and
condition mud to trip. Mud coming back from 175 vis and up.
Stage from 3 bpm at 820 psi to 7.5 bpm at 800 psi. Saw
small amount of gas with bottoms up.
Flow check, trip out at controlled speed, wet. No adverse
hole conditions on trip to shoe.
Flow check at shoe, POOH wet
LD HWDP from derrick to pipe shed
LD logging tools, MDT tool, clear rig floor
Pull wear bushing
Pressure test BOPE as per BP I AOGCC regulations
Witness of test waived by AOGCC representative, John
Spalding.
Pull test plug, run wear bushing
MU mule shoe BHA, RIH to 5587', casing shoe
Rig service, slip I cut drilling line, service top drive
Circulate mud
Trip in breaking circulation every 20 stands to 12,500'
Trip in breaking circulation every 500' to 14,440'
Circulate and condition mud, 650 gpm, at 90 RPM no
losses
Set cement plug #1, 14,440' to 13,440'
Set as per program with 105 bbls. of 15.8 cement. No losses
during spotting of cement.
Trip out to 13,440', pull at 3.5 minutes / stand
Circulate bottoms up, overboard 60 bbls contaminated
mud, cement strung out in mud. No losses during circulation
of mud.
Circulate and spot 10.8 mud spacer, 475 bbls as per
program
Trip out to 10,750', pull at 3.5 minutes / stand
Circulate bottoms up to confirm 10.8 ppg mud at surface
Circulate bottoms up to confirm 10.8 ppg mud spacer,
spacer to surface, Pipe tally error, actual depth 10,870'
not 10,750'
Circulate and spot 35 bbls of 10.8 ppg mud spacer
Trip out to 10,750', circulate to confirm 10.8 ppg mud
spacer, spacer to surface
Batch mix form-a-plug, circulate wellbore
Circulate and spot form-a-plug from 10,750' to 10,475' as
per program
Pull out of plug at cotrolled speed, trip out to 10,400'
Break circulation, pump 50 bbls mud to clean pipe,
POOH to casing shoe at 5585'
Wait on form-a-plug to set
Trip in to 10,200'
Break circulation, wash from 10,200' to 10,575'
Printed: 7/1512002 8:52:33 AM
")
)
BP'EXPLQRATION'
opera~iO"$)$~rf1'm~.piRéport.
Legal Well Name: S-113
Common Well Name: S-113
Event Name: DRILL +COMPLETE
Contractor Name: DOYON
Rig Name: DOYON 14
Date From ~ To tiours . Task ,'CPde NPT
71212002 10:30 - 11 :30 1.00 STKOH C
11:30 -12:00 0.50 STKOH C
12:00 - 17:00 5.00 STKOH C
17:00 - 17:30 0.50 STKOH C
17:30 - 18:30 1.00 STKOH C
18:30 - 19:30 1.00 STKOH C
19:30 - 23:30 4.00 STKOH C
23:30 - 00:00 0.50 STKOH C
7/3/2002 00:00 - 02:30 2.50 STKOH C
02:30 - 05:00 2.50 STKOH C
05:00 - 05:45 0.75 STKOH C
05:45 - 06:30 0.75 STKOH C
06:30 - 08:30 2.00 STKOH C
08:30 - 09:30 1.00 STKOH C
09:30 - 11 :30 2.00 STKOH C
11 :30 -13:30 2.00 STKOH C
13:30 - 14:00 0.50 STKOH C
Ë(\¿' c)Ç.
CS.'\ð
T4:00-::-2'röO----'7.õ1f 'öRïLC-- 'C---" ----'..--' .
21 :00 - 22:00 1.00 DRilL C
22:00 - 00:00 2.00 DRill C
7/4/2002 00:00 - 12:00 12.00 DRill C
12:00 - 12:30 0.50 DRill C
12:30 - 13:30 1.00 DRill C
13:30 -14:30 1.00 DRill C
14:30 - 00:00 9.50 DRILL C
7/5/2002
00:00 - 01 :30
1.50 DRill C
01 :30 - 03:30
2.00 DRill C
03:30 - 04:30
1.00 DRill C
Page 6 of 11
Start: 6/16/2002
Rig Release: 7/13/2002
Rig Number:
Spud Date: 6/17/2002
End: 7/13/2002
Ð~§cription,df Operations
PROD1 No indication of plug
PROD1 Trip out to 10,525'
PROD1 Circulate form-a-plug to surface, overboard 110 bbls,
circulate and condition mud, offload mud from trucks to
mud tanks
PROD1 Spot balanced kick off plug from 10,575' to 10,150' as
per program
PROD1 Trip out of plug at cotrolled speed to 9850'
PROD1 Break circulation, drop pipe wiper ball, pump ball out
mule shoe, flow check, pump slug
PROD1 Trip out, lay down 30 singles of excess drillpipe
PROD1 Clear I clean rig floor of tools, function blind rams
PROD1 PU, MU, directional BHA #5, bit, motor set at 1.5 degree,
adjustable stablizer, function test AGS, install MWD
probe
Trouble shoot MWD, upload MWD
PU, MU, NMDCs, surface test MWD
PJSM, load MWD wI nuclear sources
Trip in to casing shoe at 5587'
Rig service, slip I cut drilling line, service top drive
WOC, circulate and condition mud
Trip in to 10,000', fill pipe every 30 stands
Wash down from 10,000' to 10,045', tag cement,
Cement plug compressive strength held 20,000 Ibs WOB
Drill cement from 10,045' to 10,095'
Circulate and record drilling parameters
PRÖö:f'- 'Cireciföñãl drill from 10,095 to 10,437'
Directional drill off "kick off plug" with no time drilling
PROD2 Change out mud while drilling, transfer truck pump could
not keep up to drilling -rate, circulate at a reduced rate
during transfer of mud to rig tank
PROD2 Directional drill from 10,437' to 10,604'
AST 1.83, ART 2.56, ADT 4.39
PROD2 Directional drill side track # 1, 97/8" production wellbore
From 10,604' to 11,700'
AST 3.35, ART 4.94, ADT 8.29
PROD2 Directional drill from 11,700' to 11,725'
Circulate sweep in wellbore
PROD2 Circulate sweep to surface, 50 % increase in cuttings
SPRs, flow check
PROD2 Wiper trip from 11,725' to 10,125', flow check
Wellbore in good condition
PROD2 Directional drill from 11,725' to 12,345'
Control drill from 12,345' to 12,540', 90 ft I hr
Wellbore in good condition, slight gas at shakers
AST 1.33, ART 4.82, ADT 6.15
PROD2 Directional drill sidetrack # 1, 97/8" production wellbore
From 12,540' to 12,640', TO
Wellbore in good condition
AST 0.0, ART 1.18, ADT 1.18
PROD2 Circulate I condition mud, raise mud weight from 10.1 + to
10.2+, gas cut mud at surface, SPRs
PROD2 Wiper trip from 12,640' to 11,600', vællbore in good
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Printed: 7/1512002 8:52:33 AM
')
)
. BPEXPLORA TION
Operations Summary. Report
Page 7 of 11
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
7/5/2002
7/6/2002
717/2002
C'rvJ a\
c::::.. - \ \ ~A
S-113
S-113
DRILL +COMPLETE
DOYON
DOYON 14
Spud Date: 6/17/2002
End: 7/13/2002
Start: 6/16/2002
Rig Release: 7/13/2002
Rig Number:
From - To Hours Task Code NPT Phase Description of Operations
03:30 - 04:30 1.00 DRILL C PROD2 condition, flow check, wellbore static,
04:30 - 05:30 1.00 DRILL C PROD2 Circulate bottoms up, gas cut mud
05:30 - 07:30 2.00 DRILL C PROD2 Circulate I condition mud, raise mud weight from 10.2+ to
10.3+
07:30 - 08:00 0.50 DRILL C PROD2 Circulate for SPRs, flow check, wellbore static
08:00 - 09:30 1.50 DRILL C PROD2 Trip out, tight at 9903'
09:30 - 14:00 4.50 DRILL C PROD2 Back ream tight wellbore from 9903' to 9800', work tight
hole from 7500' to 5587', casing shoe
14:00 - 15:30 1.50 DRILL C PROD2 Pump slug, trip out from casing shoe to BHA
15:30 - 19:00 3.50 DRILL C PROD2 Flush BHA, rack jars, NMDCs, PJSM, remove sources,
download MWD, LD MWD, motor, bit
19:00 - 20:30 1.50 STKOH C PROD2 MU mule shoe, trip in to 5587', casing shoe
20:30 - 21 :30 1.00 STKOH C PROD2 Rig service, slip I cut drilling line, service top drive
21 :30 - 00:00 2.50 STKOH C PROD2 Trip in, break circulation every 20 stands, wash from
12,000' at 6 bpm at 650 psi to bottom,
00:00 - 02:30 2.50 STKOH C PROD2 Wash from 12,000' to 12,640'
02:30 - 04:00 1.50 STKOH C PROD2 Circulate bottoms up, 600 gpm at 1650 psi
04:00 - 05:00 1.00 STKOH C PROD2 Spot P&A plug, 12,640' to 11,840', as per program
05:00 - 06:00 1.00 STKOH C PROD2 Pull 1 stand at 5 minutes I stand, pull next stands at 3.5
minutes I stand
06:00 - 07:30 1.50 STKOH C PROD2 Circulate bottoms up,
07:30 - 08:30 1.00 STKOH C PROD2 Spot 307 bbls of mud spacer, 11,840' to 10,185',
as per program
08:30 - 09:00 0.50 STKOH C PROD2 Pull 1 stand at 5 minutes / stand, pull next stands at 3.5
minutes I stand,
09:00 - 12:00 3.00 STKOH C PROD2 Circulate bottoms up, confirm mud spacer, 5 bbls of
spacer to surface
12:00 - 13:00 1.00 STKOH C PROD2 Spot 35 bbls of M I, form-a-plug, 10,185' to 9,740',
as per program
13:00 - 14:00 1.00 STKOH C PROD2 Pull 1 stand at 5 minutes / stand, pull next stands at 3.5
minutes / stand
14:00 - 15:30 1.50 STKOH C PROD2 Trip out to casing shoe at 5587'
15:30 - 17:30 2.00 STKOH C PROD2 Wait on form-a-plug to set
17:30 - 18:30 1.00 STKOH C PROD2 Trip in to 9700'
18:30 - 23:00 4.50 STKOH C PROD2 Wash from 9700' to 10,025', circulate form-a-plug out,
overboard 210 bbls mud, circulate / condition mud
23:00 - 00:00 1.00 STKOH C PROD2 Spot kick off plug, 10,025' to 9,600', as per program
00:00 - 01 :00 1.00 STKOH C PROD2 POH w/ OEDP to 9,272 ft
01 :00 - 01 :30 0.50 STKOH C PROD2 Drop DP wiper ball and displace out of DP
01 :30 - 04:00 2.50 STKOH C PROD2 POH w/ OEDP.
04:00 - 04:30 0.50 DRILL C PROD3 Pull wear bushing, RU to test BOPE
04:30 - 07:00 2.50 DRILL C PROD3 Test BOPE to BP & AOGCC regs
07:00 - 07:30 0.50 DRILL C PROD3 RD test equip. Run wear bushing
07:30 - 12:30 5.00 DRILL C PROD3 MU 9 7/8" bit, MM, MWD I LWD. Load same. Surface test
same O-K
12:30 - 14:30 2.00 DRILL C PROD3 RIH w/9 7/8" bit to 103/4" shoe @ 5,620 ft.
14:30 - 16:00 1.50 DRILL C PROD3 Circ & cond mud. woe
16:00 - 17:30 1.50 DRILL C PROD3 Can't RIH to 9,136 ft
17:30 - 19:00 1.50 DRILL C PROD3 Circ & cond mud. woe
19:00 - 20:00 1.00 DRILL C PROD3 Wash 9,136 - 9,518 ft. TOC
20:00 - 00:00 4.00 DRILL C PROD3 Dress off cmt plug 9,518 - 9.]00.
)
.,
c:::? Od.-JYO
04-Aug-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well S-113A
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,043.64' MD
Window / Kickoff Survey 10,098.00' MD (if applicable)
Projected Survey: 12,640.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIV'ED
/. ! I '" .....,,., OO?
.\~)J 0 (L -
Alaska Oil & Gas Cons. Commissior:
,4nchorage
North Slope Alaska
BPXA
PBU_WOA S Pad, Slot 5-113
S-113A
Job No. AKZZ22095, Surveyed: 5 July, 2002
-
SURVEY REPORT
2 August, 2002
Your Ref: API 500292309401
Surface Coordinates: 5980744.90 N, 618930.13 E (700 21' 21.7672" N, 149002' 02.8638" W)
Kelly Bushing: 70.33ft above Mean Sea Level
---
spe""''''''y-sul!
DRILLING SERVICes
A Halliburton Company
Survey Ref: svy11231
Sperry-Sun Drilling Services .
Survey Report for S-113A
Your Ref: API 500292309401
Job No. AKZZ22095, Surveyed: 5 July, 2002
BPXA
North Slope Alaska PBU_WOA S Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
10043.64 68.440 284.670 4968.92 5039.25 1861.10 N 7726.00 W 5982483.11 N 611175.55 E 7677.15 Tie On Point
10095.00 68.450 284.690 4987.79 5058.12 1873.21 N 7772.21 W 5982494.48 N 611129.16 E 0.041 7723.05 WIndow Poinl
10115.44 67.200 283.720 4995.50 5065.83 1877.85 N 7790.56 W 5982498.83 N 611110.74 E 7.531 7741.27 ~/
1021048 63.650 285.010 5035.02 5105.35 1899.28 N 7874.28 W 5982518.93 N 611026.69 E 3.934 7f\24.43
10107 ()7 G1 G10 2f\4.J10 5079.41 5149.74 1920.99 N 7957.26 W 5982539.32 N 610943.37 E 2.188 7g0G.85
1040171 61.140 283.570 5124.74 5195.07 1941.01 N 8037.90 W 5982558.05 N 610862.43 E 0.860 79R6.95
10499.32 58.840 282.840 5173.55 5243.88 1960.32 N 8120.18 W 5982576.06 N 610779.85 E 2.444 8068.73
10595.48 55.840 282.320 5225.44 5295.77 1977.96 N 8199.18 W 5982592.44 N 610700.58 E 3.153 8147.26
10692.94 52.030 279.820 5282.81 5353.14 1993.12 N 8276.46 W 5982606.37 N 610623.07 E 4.425 8224.15
10788.40 50.340 276.440 5342.65 5412.98 2003.66 N 8350.07 W 5982615.74 N 610549.30 E 3.278 8297.4 7
10883.68 4Y.120 27J.GOO 5404.25 5474.58 2010.04 N 8422.47 W 5982620.97 N 610476.81 E 2.610 8369.69
10979.87 47.610 271 .850 5468.16 5538.49 2013.47 N 8494.28 W 5982623.26 N 610404.96 E 2.077 8441.38
11075.10 47.810 270.930 5532.24 5602.57 2015.18N 8564.70 W 5982623.85 N 610334.52 E 0.745 8511.74
11171.10 46.790 273.480 5597.34 5667.67 2017.88 N 8635.19 W 5982625.43 N 610263.99 E 2.222 8582.14
11267.01 44.570 275.890 5664.35 5734.68 2023.45 N 8703.57 W 5982629.92 N 610195.54 E 2.931 8650.36
11362.79 40.110 277.630 5735.14 5805.4 7 2031.00 N 8767.61 W 5982636.45 N 610131.38 E 4.814 R71'L20
11459.58 35.160 278.170 5811.76 5882.09 2039.11 N 8826.14 W 5982643.63 N 610072.73 E 5.125 8772.50
11555.01 30.700 275.170 5891.84 5962.17 2045.21 N 8877.63 W 5982648.91 N 610021.15 E 4.975 8823.82
11650.99 27.330 269.860 5975.78 6046.11 2047.37 N 8924.08 W 5982650.33 N 609974.67 E 4.416 8870.21
11746.01 24.700 262.250 6061 .19 6131.52 2044.64 N 8965.58 W 5982646.94 N 609933.21 E 4.467 8911.77
-~
11841.78 22.380 253.560 6149.01 6219.34 2036.77 N 9002.91 W 5982638.49 N 609896.01 E 4.353 8949.28
11936.01 19.090 245.890 6237.14 6307.4 7 2025.40 N 9034.20 W 5982626.62 N 609864.91 E 4.520 8980.84
12033.00 16.170 245.300 6329.57 6399.90 2013.27 N 9060.95 W 5982614.07 N 609838.36 E 3.016 9007.89
12128.71 14.610 243.450 6421.84 6492.17 2002.31 N 9083.86 W 5982602.74 N 609815.63 E 1.709 9031.06
12223.81 13.410 240.100 6514.11 6584.44 1991.45 N 9104.15 W 5982591.56 N 609795.51 E 1.522 9051.62
12319.53 12.930 238.960 6607.31 6677.64 1980.39 N 9122.95 W 5982580.21 N 609776.89 E 0.570 9070.68
12416.20 13.200 238.330 6701.48 6771.81 1969.02 N 9141.61 W 5982568.54 N 609758.41 E 0.316 9089.62
12512.23 13.190 238.260 6794.98 6865.31 1957.50 N 9160.26 W 5982556.73 N 609739.95 E 0.020 9108.55
12564.93 13.340 237.860 6846.27 6916.60 1951.10N 9170.52 W 5982550.17 N 609729.79 E 0.334 9118.97
12640.00 13.340 237.860 6919.32 6989.65 1941.89 N 9185.18 W 5982540.72 N 609715.27 E 0.000 9133.86 Projecten Survey
2 August, 2002 - 10:59
Page 20f3
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for S-113A
Your Ref: API 500292309401
Job No. AKZZ22095, Surveyed: 5 July, 2002
.
North Slope Alaska
BPXA
PBU WOA S Pad
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to S-113. Northings and Eastings are relative to S-113.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from S-113 and calculated along an Azimuth of 268.570° (True).
_/
Based IlrOn Minimum Curvature type calculations, at a Measured Depth of 12640.00ft.,
The Bottom Hole Displacement is 9388.21 ft., in the Direction of 281.937° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
10043.64
10095.00
12640.00
5039.25
5058.12
6989.65
1 861 .1 0 N
1873.21 N
1941.89 N
7726.00 W
7772.21 W
9185.18 W
Tie On Point
Window Point
Projected Survey
Survey tool program for S-113A
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
-~
Survey Tool Description
0.00
861.00
0.00 861.00
856.19 12640.00
856.19 Tolerable Gyro (S-113 GYRO)
6989.65 AK-6 BP JFR-AK (S-113)
2 August. 2002. 10:59
Page 3 of 3
DrillQlIesf 2.00.08.005
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well S-113A MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,043.64 I MD
Window / Kickoff Survey 10,098.00' MD (if applicable)
Projected Survey: 12,640.00 I MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment( s)
Ô/0:;)-/Yo
)
04-Aug-02
RECE\VED
!,1 1('.] 0 -;: ?OO?
1-\ V \ I t.... ~
ÀÌaSKB 01\ & Gas Cons. Commtssion
Anchorage
North Slope Alaska
BPXA
PBU_WOA S Pad, Slot S-113
S-113A MWD
Job No. AKMW22095, Surveyed: 5 July, 2002
SURVEY REPORT
2 August, 2002
Your Ref: AP/500292309401
Surface Coordinates: 5980744.90 N, 618930.13 E (70021' 21.7672" N, 149002' 02.8638" W)
Kelly Bushing: 70.33ft above Mean Sea Level
~/
=¡".,..... .'-'Y-Sur,
DRILLING SERVices
A Halliburton Company
Survey Ref: svy11259
Sperry-Sun Drilling Services .
Survey Report for S-113A MWD
Your Ref: API 500292309401
Job No. AKMW22095, Surveyed: 5 July, 2002
BPXA
North Slope Alaska PBU - WOA 5 Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
j()().U \,.1 ¡,¡~..Hl) ¿¡~fj5~U 4~biJ.96 5039.29 1854.07 N 7726.91 W 5982476.07 N 611174.76E 7678.23 Tie On Point
I ()()~6l)U ljBA5U ¿U4.6~0 4987.83 5058.16 1866.95 N 7772.90 W 5982488.21 N 611128.57 E 3.441 7723.89 Window Point
1011 ~).44 Ö 7. 2UO 284.730 4995.54 5065.87 1871.76 N 7791.21 W 5982492.73 N 611110.19 E 6.118 7742.07
1 q:- " \ .1 :.~ ¡:'Ui',O ~):.n (1BO r,r; '~r, 013 5105.39 1892.97 N 7874.98 W 5982512.61 N 611026.09 E 3.868 7825 :>'\
Ill...)\) ,".u I lJ l.uJLJ ¿ij..).G0LJ ~u /~.45 5149.78 1913.27 N 7958.33 W 5982531.58 N 610942.43 E 2.081 780ö. I U
10401.71 1;1 140 2WUì50 5124.78 5195.11 1932.90 N 8039.05 W 5982549.93 N 610861.40 E 0.519 798831
I 04~)V.JL ~B.U4U 283.43U 5173.59 5243.92 1952.69 N 8121.22 W 5982568.41 N 610778.93 E 2.364 8069.96
llElJG.'W ~J5.B40 283.250 5225.48 5295.81 1971.37 N 8199.98 W 5982585.84 N 610699.88 E 3.124 8148.23
1 Ot ;~J:) ~J.1 ~1:! (HO L7U720 5282.86 5353.19 1987.11 N 8277.14 W 5982600.35 N 610622.48 E 4.883 8224.97
I ()If\;¡.() ',() : ~.1f .'j{.100 SJ.12.10 5413.03 1998.01 N 8350.70 W 5982610.08 N 610548.76 E 2.776 829824
lO;H~j I ¡I) .I~J. 1LO ;.' t:3.~UO 5404.29 5474.62 2004.99 N 8423.05 W 5982615.91 N 610476.31 E 2.864 8370.39
1 U~/!J.B7 41.ülU 2J¿.U20 5468.20 5538.53 2008.72 N 8494.84 W 5982618.50 N 610404.47 E 2.144 8442.06
1107S.10 47.810 270.260 5532.28 5602.61 2010.11 N 8565.26 W 5982618.78 N 610334.03 E 1.383 8512.43
111/1.10 4G.l90 272.750 5597.39 5667.72 2011.95 N 8635.78 W 5982619.50 N 610263.50 E 2.182 8582.88
112G7.01 44.570 275.840 5664.40 5734.73 2017.06 N 8704.19 W 5982623.52 N 610195.02 E 3.266 8651.14
113G2.79 40.110 277.690 5735.19 5805.52 2024.61 N 8768.23 W 5982630.05 N 610130.86 E 4.834 8714.97
11459.58 35.160 278.320 5811.81 5882.14 2032.82 N 8826.74 W 5982637.33 N 610072.23 E 5.130 8773.26
11555.01 30.700 275.090 5891.90 5962.23 2038.96 N 8878.22 W 5982642.65 N 610020.65 E 5.021 8824.58
11650.99 27.330 269.550 5975.83 6046.16 2040.96 N 8924.68 W 5982643.92 N 609974.17 E 4.487 8870.97
11746.01 24.700 262.020 6061.24 6131.57 2038.03 N 8966.17 W 5982640.33 N 609932.73 E 4.438 8912.52 --
11 84 1 .7 8 22.380 253.800 6149.06 6219.39 2030.17 N 9003.51 W 5982631.87 N 609895.52 E 4.192 8950.05
11936.01 19.090 245.900 6237.19 6307.52 2018.86 N 9034.82 W 5982620.07 N 609864.40 E 4.576 8981.62
12033.00 16.170 245.520 6329.62 6399.95 2006.79 N 9061.60 W 5982607.57 N 609837.82 E 3.013 9008.69
12128.71 14.610 243.840 6421.89 6492.22 1995.94 N 9084.56 W 5982596.37 N 609815.03 E 1.695 9031.92
12223.81 13.410 240.380 6514.16 6584.49 1985.20 N 9104.91 W 5982585.30 N 609794.85 E 1.538 9052.54
12319.53 12.930 239.360 6607.36 6677.69 1974.26 N 9123.78 W 5982574.06 N 609776.16 E 0.557 9071.67
12416.20 13.200 238.840 6701.53 6771.86 1963.04 N 9142.53 W 5982562.54 N 609757.59 E 0.305 9090.69
12512.23 13.190 238.770 6795.03 6865.36 1951.68 N 9161.28 W 5982550.89 N 609739.02 E 0.020 9109.72
12564.93 13.340 238.320 6846.32 6916.65 1945.37 N 9171.59 W 5982544.42 N 609728.81 E 0.346 9120.19
12640.00 13.340 238.320 6919.37 6989.70 1936.28 N 9186.33 W 5982535.09 N 609714.21 E 0.000 9135.15 Projected Survey
----~~--~---
-- ----------- -- -
---------- -
2 August, 2002 - 10:58
Page 20f3
Dril/Quest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for S-113A MWD
Your Ref: API 500292309401
Job No. AKMW22095~ Surveyed: 5 July~ 2002
.
North Slope Alaska
BPXA
PBU_WOA 5 Pad
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical d(;plli~ (lie rdative to 8-113. Northings and Eastings are relative to S-113.
1 lie O(JUI(~U SI;verity IS ill Degrees per 100 feet (US).
Vertical Seclí<J11 is from 8-113 and calculated along an Azimuth of 268.570° (True).
~
BCJ:::)uJ U!J(JII 1.1111i11lUIII CUI vulure type calculéltions, at a Measured Depth of 12640.00ft.,
The Bottom Hole Displacement is 9388.18ft. in the Direction of 281.902° (True).
Comments
Measured
Dcptll
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
10043.fJ4
10095.00
12640.00
503929
5058.16
6989.70
1854.07 N
1866.95 N
1936.28 N
7726.91 W
7772.90 W
9186.33 W
Tie On Point
Window Point
Projected Survey
Survey tool program for S-113A MWD
........../
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth Survey Tool Description
(ft) (ft) (ft) (ft)
0.00
861.00
0.00 861.00
856.19 12640.00
856.19 Tolerable Gyro (S-113 GYRO)
6989.70 MWD Magnetic (8-113 MWD)
- -- -- ------
------- --~ ---- - - - -
2 August, 2002 - 10:58
Page 3 of 3
DriIJQuest 2.00.08.005
)
àOò---/L}a
Oq<ö'3
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7t11 Avenue, Suite 100
J\nchorage,Alaska
August 16, 2002
RE: MWD Formation Evaluation Logs S-113A,
AK-MW-22095
1 LDWG formatted Disc with verification listing.
~I#: 50-029-23094-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Signed:~Whp,-. ,
RECEIVED
AUG 2 J 2002
Alaska Oi, & Gas Cons. COO1l'lJlsion
Anchnge
)
")
\lJé;A- 1/1/ CJL
:If!- 7(q Ló L
()'"::f 0 ') lei> ./
1. Type of Request: II Abandon
0 Alter Casing
0 Change Approved Program
2. Name of Operator
BP Exploration- (Alaska) Inc.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
0 Suspend II Plugging 0 Time Extension 0 Perforate
0 Repair Well 0 Pull Tubing 0 Variance II Other
0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate Plug Back for Sidetrack
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of well:
Ia Development
0 Exploratory
0 Stratigraphic
0 Service
6. Datum Elevation (DF or KB)
Planned RKB= 70.331
7. Unit or Property Name
Prudhoe Bay Unit
4. Location of well at surface
738' SNL, 783 EWL, SEC. 35, T12N, R12E, UM
At top of productive interval
1207' NSL, 2195' EWL, SEC. 28, T12N, R12E, UM (Planned)
At effective depth
NIA
At total depth
1153' NSL, 2003' EWL, SEC. 28, T12N, R12E, UM (Planned)
12. Present well condition summary
Total depth: measured
true vertical
8. Well Number
S-113A
9. Permit Number
202-140
10. API Number
50- 029-23094-01
11. Field and Pool
Prudhoe Bay Field I Aurora Pool
(Undefined)
Effective depth: measured
true vertical
12640' feet
6990 feet
feet
feet
Plugs (measured) Kick Plug at 9600' MD with abandoment plugs below.
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
115'
5553'
34" X 20"
10-3/4"
260 sx Arctic Set (Approx.)
784 sx Arcticset Lite 3,750 sx 'G'
115'
5587'
115'
3374'
RECEr\/ED
Perforation depth: measured
None
true vertical
JUL 8 2002
Tubing (size, grade, and measured depth)
None
Alaska 011 & üas Cons. Commission
Anchorage
Packers and SSSV (type and measured depth) None
13. Attachments
Ia Description Summary of Proposal
0 Detailed Operations Program
15. Status of well classifications as:
Ia Oil 0 Gas 0 Suspended
0 BOP Sketch
14. Estimated date for commencing operation
07/05/02
16. If proposal was verbally approved /
Winton Aubert 7/5/2002
Name of approver Date Approved
ContactEngineerNameINumber. Bil/ls acson,564-5521 Michael Triolo, 564-5774
17. I ~erebY certify that the for ing is ?t:ru n orrect to the best of my knowledge
Signed L II C ~ _.AJ.AI' Title Senior Drilling Engineer
~e m ~'--~ .
, "I .' I" , '. ,.', . . 1:'~:l)~'~;:.~':~::~J;t~:i~~,.i:~fl~,,~~~::,?I;;:,:;:~;!:~;\:'I"~~:t:,;:.'i";:':.::';~;íi¡:t,;;{::::j~~:::: ,":
Service
Prepared By NameINumber. Sandra Stewman, 564-4750
Date
7-~-QJ--
"0',
." '11 -1"
otify Commission so representative may witness
Plug integrity - BOP Test - Location clearance -
Mechanical Integrity Test ~ Sy.bsequent form required 10- 407
ú'll91Oal ~gned By
Approved by order of the Commission Cammy Üfi1sfì a,,,,", ~ N A L
Form 10-403 Rev. 06/15/88 U K L11 ~.,
I Approval No.3 ð d- - ;;2/ 0
rtWv ~ ~ ~~'L úwf I. 1
Date t1 (]I O'~
Submit In Tr'p icate
Commissioner
"
~
~
~~
,..n
~
~
:J
\--
bp
')
)
To:
Winton Aubert - AOGCC
Date: July 5, 2002
From:
William Isaacson - BPXA GPB Drilling & Wells
Subject:
Reference:
S-113A Application for Sundry Approval -
Plug Back well for Sidetrack Operations
API # 50-029-23094-01
Dear Mr. Aubert,
After successfully sidetracking the original open hole section, Aurora Well S-113A was drilled as planned
10 the proposed target. However the reservoir once again contained gas, and the well will not be
completed at this location. The well penetrated the Kuparuk reservoir approximately -147' high and LWD
logs showed signs of gas in the reservoir. Plans are to plug back and sidetrack to a Kuparuk target
approximately 1400' to the southwest of the S-113A penetration. Below is an outline of the proposed plug
back and sidetrack operations. Also enclosed is a schematic of the existing well bore and proposed plug-
back.
If you have any questions or require any additional information, please contact me at 564-5521.
Scope
Ria Operations:
1. RIH to TD at 12,640' MD with 5" DP cement stinger. Circulate and condition well for cementing
operations. Spot a balanced 15.8 ppg cement P&A plug from TD to +/-11,840' MD (-450' above the
Top Kuparuk Reservoir). Plug volume should be based upon an equivalent hole diameter of
10.4" throughout this section (84 bbls total). Pull above cement plug and circulate DP clean.
2. Spot a 11.0 ppg heavy mud spacer from top of cement P&A plug at -11,840' MD to -9450' MD. Pull
DP up to 10,200' MD and circulate out any excess heavy mud spacer above this point.
3. Spot a 10.7 ppg Form-A-Plug pill (cross-linked polymer pill) from 10,200' to -9925' MD to act as a
base for the upcoming cement kick-off plug. Pull DP above top of plug and circulate any excess pill
out of DP. Pull to shoe and wait on Form-A-Plug to set (-6 hrs).
4. RIH to -9800' and wash down looking for top of plug. Once top of plug is verified, condition mud as
required for spotting the cement kick-off plug.
5. Spot a 15.8 ppg cement kick-off plug from 10,000' to 9600' MD (estimated depths). Plug volume
should be based upon an equivalent hole diameter of 11.4" throughout this section (51 bbls
total). Pull DP above plug and circulate OP clean. POOH.
6. PU 9-7/8" drilling assembly and RIH. Dress top of cement as required. Planned kick-off point is at
-9750' MD, however will kick-off soon if plug allows. Kick-off and drill the 9-7/8" hole section as per
directional plan to TO @ :t13,595' MD (7245' TVO). POOH.
7. Run and cement the 7", 26# production casing as required to cover all significant hydrocarbon
intervals (no significant hydrocarbons were seen in the Ugnu or West Sak intervals and therefore,
plans are to bring cement -1200' above top Kuparuk formation only). Displace the 7" casing with
seawater during cementing operations. Once cement has had adequate time to set, freeze protect
the 7" x 10-3/4" annulus as required.
8. RU slick-line and run gauge ring / junk basket to PBTD.
9. Run a 4-1/2",12.6#, L-80 TC-II completion and space-out tubing tail -50' MD above top Kuparuk.
S-113A Application for Sundry
)
)
10. RU slick-line. RIH with standing valve and set in 'XN' nipple below packer. Set packer and test the
tubing to 3500 psi and annulus to 3500 psi for 30 minutes. Shear open RP valve in bottom GLM.
11. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
12. Freeze protect the well to -2400'. Secure the well. Rig down and move off.
Post-RiQ Work:
1. RU e-line and perforate the Kuparuk interval, using bottom most GLM to circulate guns down as
req u ired.
2. Pull RP shear valve from bottom GLM and install dummy valve.
3. . Fracture stimulate Kuparuk and perform cleanout as required.
4. Install gas lift valves.
S-113A Application for Sundry
TREE: 4-1/16" - 5M Carbon
WELLHEAD: 135/8" - 5M FMC SH
10-3/4",45.5 #/ft, L-80, BTC ~
I 5587' I
Planned KOP from 9600' to 9750' MD
Base of West Sak / Top Colville Shale at
-10,60S' MD
TO of 9-7/8" hole 112,640' I ""-
Date
7/05/02
Rev By
WSI
) )
S-113A Proposed Plug-Back
Cellar Elevation = 36.0'
Doyon 14 RKB = 70.33'
..
I
Top of 15.8 ppg Kick-off Plug at I 9600'
. 15.8 ppg Cement
Kick-off Plug
10.7 ppg Form-A-Plug Top of Form-A-Plug pill at I 10,000' I
,:!'~ CementS... '!~ Top of 11.0 ppg Mud Spacer.t I 10,200' I
f,,~ I
I~
';: ¡ii .,.' q
'I ""'1 ~ï ~ . ....J
~ Ii ~ .! ¡,
:. )t~j
~
Top of 15.8 ppg P&A Plug at I 11,840' I
Top Kuparuk Reservoir at I 12,284' I
15.8 ppg Cement
P&A Plug
Comments
Aurora
WELL: S-113A
API NO: 50-029-23094-01
Proposed Plug Back for Sidetrack Operations
BP Alaska Drilling & Wells
TREE: 4-1/16" - 5M Carbon
WELLHEAD: 135/8" - 5M FMC SH
10-3/4",45.5 #/ft, L-BO, BTC j
I 5587' I
7",26 #/ft, L80, BTC-Mod
113,595' I ~
Date
7/05/02
Rev By
WSI
)
8-1138 Proposed Completion
I
I
L
L
L
L
ir
)
4-1/2" tubing hanger
Cellar Elevation = 36.0'
Doyon 14 RKB = 70.33'
1 2350' I 4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 12.6# L-80 TC-II Tubing
~
4-1/2" Gas Lift Mandrels with handling pups installed.
~--"_.-'------'-'--'---"-'-------- ,-.----.--.--.----.,-.-......-.--------.---.---.--
GAS LIFT MANDRELS
--------...--,.--.---...... --..-..-..-.-..".-.-"'-"---'--'
----.".-- ---,.-._,-,,--_." ..----,-.-..-,- _._...._-~._'...__..w .,-."-
# TVD Size
Valve Type
4
3
2
1
3800'
5600'
6600'
One full joint
above packer
1 "
1"
1"
1"
DV
DV
DV
RP Shear
-"---'--~-'----' ----_.__..n____.,--.-.-------
---,.. ---'--' -,.._--~-- .--- .." .--~~--,._.._...._---_..- . --..-.----,--...- - -------... m- -.. ----
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
T' x 4-1/2" Baker '8-3' Production Packer
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID.
4-1/2" WireLine Entry Guide at -13,050' (approximately 50' MD above the top Kuparuk).
Plug Back Depth I 13,495' I
....
Proposed Completion
Comments
Aurora
WELL: S-113B
API NO: 50-029-23094-02
BP Alaska Drilling & Wells
~.\II [ÆV.I ¡ rÞ rIT! ~.
I: ..I,L lU} U
L.; w ~ "--""
)
~~fÆ~~fÆ
)
AI1ASIiA. OIL AND GAS
CONSERVATION COMMISSION
I
/
J
l
/
/
TONY KNOWLESJ GOVERNOR
333 W. TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re:
Prudhoe Bay Unit S-113A
BP Exploration (Alaska), Inc.
Permit No: 202-140
Surface Location: 738' SNL, 783' FWL, Sec. 35, T12N, R12E, UM
Bottomhole Location: 1153' NSL, 2003' EWL, Sec. 28, T12N, R12E, UM
Dear Mr. Crane:
Enclosed is the approved application for permit to drill the above development well.
The permit to drill does not exempt you from obtaining additional permits or approvals required by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient
notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe
must be given so that a representative of the Commission may witness the test. Notice may be given by
contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
'" ~_'APr;
~. :~ð-t'
C~ChSli Taylor
Chair
BY ORDER Of THE COMMISSION
DATED thisjfb.day of July, 2002
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Hole
9-7/8"
) STATE OF ALASKA )
ALASKAI,_,.. AND GAS CONSERVATION COMMk,~ION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Planned RKB= 70.33' Prudhoe Bay Field I Aurora
6. Property Designation Pool (Undefined)
ADL 028258
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number /'
S-113A
9. Approximate spud d~
07/01/02 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 13011' MD I 7330' TVD
0 17. Anticipated pressure {s,e 20 AAC 25.035 (e) (2)}
70 Maximum surface 2828 psig, At total depth (TVD) 6720' I 3500 psig
Setting Depth
TOp Rot~om QVW1ti\y Qf Cement
'enath MD TVD MD TVD / Onclude staQe data)
12990 Surface Surface 13011' 7330' 538 sx Class 'G'
V-iGA 1/3/0L
<1ft -¡(-:þ{~
1 a. Type of work 0 Drill II Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
738' SNL, 783 EWL, SEC. 35, T12N, R12E, UM
At top of productive interval
1207' NSL, 2195' EWL, SEC. 28, T12N, R12E, UM
At total depth
1153' NSL, 2003' EWL, SEC. 28, T12N, R12E, UM
12. Distance to nearest property line 13. Distance to nearest well I
ADL 028259, 2003' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 10300' MD Maximum Hole Angle
18. Casin~ Program Specifications
$I('e
CasinQ WeiQht Grade CouDlinQ
7" 26# L-80 BTC-,
11. Type Bond (See 20 AAC 25.025)
Number 2S 100302630-277
19. To be completed for Red rill , Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
14440 feet
7219 feet
feet
feet
Junk (measured)
Plugs (measured) Cement Plug at 13440' MD (07/02)
ORiGiNAL
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
115'
5553'
34" X 20"
10-3/4"
260 sx Arctic Set (Approx.)
784 sx Arcticset Lite 3, 750 sx 'G'
115'
5587'
115'
3374'
RECEIVED
Perforation depth: measured
JUL 2 2002
20. Attachments
Alaska Oil & Gas Cons. Commission
Anchorage
II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 Me 25.050 Requirements
Contact Engineer Name/Number: Bill/sa on, 564-5521 Prepared By Name/Number: Sondra Stewman, 564-4750
21. I hereby certify that the fore ng is true apct ~ect to the best of my knowledge
Signed Lowell Crane ! ~ (~ .. '. . Title,. S~nior Drilling Engineer Date '7 - ).. - O:;L
'. "" .,,'. .:~~,'..çQt~~~!Q~i;_I;;;):::i:>i,:.._"I':,:,".i.,...' . .'
Permit Number API Number AP.P"OVtl Date See cover letter
2- CJ Z. - /9 ð 50- 029-23094-01 1 g 109) for other requirements
Conditions of Approval: Samples Required 0 Yes œI No Mud Log Required 0 Yes ~ No
Hydrogen Sulfide Measures 6SI Yes 0 No Directional Survey Required 181 Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: 1" ~S.J- 13:7 P t tv .~S' 00 r~r,' .
0ñgmal'Slgned By by order of
Approved By Cammy Qechsli T aylm Commissioner the commission
Form 10-401 Rev. 12-01-85
true vertical
Date r¡ ICf h :~
Submit In Triplicate
bp
')
)
To:
Winton Aubert - AOGCC
Date: July 2, 2002
From:
William Isaacson - BPXA GPB Drilling & Wells
Subject:
Reference:
S-113A Permit to Drill -
Open Hole Sidetrack Operations on Current Well 5-113
API # 50-029-23094
Dear Mr. Aubert, /
As you are aware, Aurora Well S-113 (Permit #202-120) was drilled as planned to the proposed target,
however will not be completed due to encountering gas in the reservoir at that location. The well
penetrated the Kuparuk reservoir approximately -117' high and LWD logs showed signs of gas in the
reservoir. An unplanned open hole MDT logging run obtained a fluid gradient within the reservoir, and
verified the presence of gas. Plans are to plug back and sidetrack to a Kuparuk target approximately /
1900' to the east of the current penetration. Below is an outline of the proposed plug back and sidetrack
operations as well as the standard Drill and Complete Summary. Also enclosed is a schematic of the
existing wellbore with proposed plug-back, and proposed completion for the sidetrack well S-113A.
If you have any questions or require any additional information, please contact me at 564-5521.
Scope
RiQ Operations:
1. RIH to TD at 14,440' MD with 5" DP cement stinger. Circulate and condition well for cementing
operations. Spot a balanced 15.8 ppg cement P&A plug from TD to +/-13,440' MD (-380' above the
Top Kuparuk Reservoir). Plug volume should be based upon an equivalent hole diameter of
10.4" throughout this section (105 bbls total). Pull above cement plug and circulate DP clean.
2. Spot a 10.8 ppg heavy mud spacer from top of cement P&A plug at -13,440' MD to -9750' MD. Pull
DP up to 10,750' MD and circulate out any excess heavy mud spacer above this point.
3. Spot a 10.5 ppg Form-A-Plug pill (cross-linked polymer pill) from 10,750' to -10,475' MD to act as a
base for the upcoming cement kick-off plug. Pull DP above top of plug and circulate any excess pill
out of DP. Pull to shoe and wait on Form-A-Plug to set (-6 hrs).
4. RIH to -10,200' and wash down looking for top of plug. Once top of plug is verified, condition mud as
required for spotting the cement kick-off plug.
5. Spot a 15.8 ppg cement kick-off plug from 10,500' to 10,100' MD (estimated depths). Plug volume
should be based upon an equivalent hole diameter of 11.5" throughout this section (52 bbls
total). Pull DP above plug and circulate DP clean. POOH.
6. PU 9-7/8" drilling assembly and RIH. Dress top of cement as required. Planned kick-off point is at
-10,300' MD, however will kick-off soon if plug allows. Kick-off and drill the 9-7/8" hole section as per
directional plan to TD @ :t13,011' MD (7330' TVD). POOH.
7. Run and cement the 7", 26# production casing as required to cover all significant hydrocarbon
intervals (no significant hydrocarbons were seen in the Ugnu or West Sak intervals and therefore,
plans are to bring cement -1200' above top Kuparuk formation only). Displace the 7" casing with /'
seawater during cementing operations. Once cement has had adequate time to set, freeze protect
the 7" x 10-3/4" annulus as required.
8. RU slick-line and run gauge ring / junk basket to PBTD.
S-113A Permit to Drill
)
)
9. Run a 4-1/2",12.6#, L-80 TC-II completion and space-out tubing tail -50' MD above top Kuparuk. /'
10. RU slick-line. RIH with standing valve and set in 'XN' nipple below packer. Set packer and test the
tubing to 3500 psi and annulus to 3500 psi for 30 minutes. Shear open RP valve in bottom GLM.
11. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
12. Freeze protect the well to -2400'. Secure the well. Rig down and move off.
Post-RiQ Work:
1. RU e-line and perforate the Kuparuk interval, using bottom most GLM to circulate guns down as
required.
2. Pull RP shear valve from bottom GLM and install dummy valve.
3. Fracture stimulate Kuparuk and perform cleanout as required.
4. Install gas lift valves.
I Well Name: I S-113A
Drill and Complete Summary
I Type of Redrill (producer or injector): I Development Producer
Surface Location:
Target Location:
Bottom Hole Location:
x = 618,930.63 / Y = 5,980,744.9
7381 FNL 7831 FWL 835 T12N R12E Umiat
X = 609,750 / Y = 5,982,550
1207' F8L 2195' FWL 828 T12N R12E Umiat
X = 609,560 / Y = 5,982,494
1153' F8L 2003' FWL 828 T12N R12E Umiat
I RiQ: I Doyon 14 ,,/
I OperatinQ days to complete: 19.0
I
I
1 RKB: 170.33' I
I
Kuparuk production well in the Aurora Development (Mid Beechey Block) I
I AFE Number: 1 AUD5M0044 1
I Estimated Start Date: 107/01/02 I
I MD: 113,011' I I TVD: 17330' I
I Cellar Elevation: 136.0' I
I Well DesiQn (conventional, slim hole, etc.): I 81imhole
I Objective: 1
Formation Markers
Formation Tops
Schrader 0 Sands
Kick-off Point
Colville - CM3
Top HRZ
Top Kuparuk
Top Miluveach
TD - 7" Csg Point
MD
9863'
10,300'
10,576'
12,227'
12,436'
12,766'
13,011'
TVDss
4902'
5133'
5185'
6523'
6720'
7099'
7260'
Comments
-9.0 ppg EMW (possible hydrocarbon bearing)
Kick-off in Base Schrader (West Sak)
-9.9 ppg required for good hole stability
-9.8 ppg EMW Max (hydrocarbon bearing)
S-113A Permit to Drill
)
'")
CasinglTubing Program
Hole Size Csgl WtlFt Grade Conn Length Top Btm
Tbg O.D. MDITVD MDITVD
9-7/8" 7" 26# L-80 BTC-M -12,990' GL 13,011' /7330' /
Tubing 4%11 12.6# L-~ TC-II -12,365' GL 12,385' /6742'
Directional
KOP: I -10,300' MO
Maximum Hole Angle:
Close Approach Well:
Survey Program:
-70.8° at -3500' MO
All wells pass BP Close Approach guidelines. With respect to allowable
deviation, the nearest close approach well is V-20. The well is -1358' well-
to-well at -10,307', which allows for only 11.65' of deviation from the
proposed directional plan (toward the subject well).
IFR & Multi-Shot corrected MWO Surveys from KOP to TO.
/
Mud ProQram
9-7/8" Intermediate 1 Production Hole I LSND
From Surface Casing Shoe to TO -150' MD into Miluveach
Interval Density PV VP
(ppg)
9.5
9.6 /
10.1 /'
10.1
MBT
pH
API
Fluid Loss
6-8
6-8
4-6
4-6
Ugnu & Schrader
Colville
HRZ
Kuparuk
8-12
8-12
8-14
8-14
22-28
22-28
20-24
20-24
<15
<15
<15
<15
8.5 - 9.5
8.5 - 9.5
8.5 - 9.5
8.5 - 9.5
InteQrity TestinQ:
Test Point
Surface Casing Shoe
Depth T est Type
20' of new hole below shoe LOT
EMW ,
LOT - Had successful LOT to 16.35 /'
EMW at surface casing shoe.
Logging Program
9-7/8" Inter 1 Prod:
Drilling: MWD 1 GR 1 Res -_Realtime over entire interval
Den 1 Neu -_Realtime over Kuparuk interval only
Open Hole: None
Cased Hole: No cased hole logs are planned with the rig on location.
S-113A Permit to Drill
')
Cement Program
Casing Size 19-7/8" Intermediate 1 Production I
Basis: Lead: None
Tail: Based on 1775' of open hole (to ~1200 MD above top Kuparuk formation) with 30% excess +
82' shoe track volume.
Tail TOC: ~1200' MD above top Kuparuk at 11,236' MD
Fluid Sequence & Volumes: Pre 30 bbls Chemical wash at 8.3 ppg
Flush
Spacer
Lead
Tail
40 bbls MudPUSH Viscosified Spacer weighted to 11.0 ppg
None
112 bbls 1629 fe I 538 sks of Dowell Premium Latex 'G' at 15.8
ppg and 1.17 cf/sk, BHST 165° I BHCT 125°, TT = 1.5 hrs
Batch Mix + 3.5 hrs
*See Attached Dowell Cement Program for Details on Cement Formulation*
S-113A Permit to Drill
)
)
Well Control
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and
annular preventer will be installed and is capable of handling maximum potential surface pressures.
Based upon calculations below, BOP equipment will be tested to 3500 psi. ,,/
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
.
Production Section-
Maximum anticipated BHP: 2200 psi @ 4600' TVDss - Schrader Bluff
Maximum surface pressure: 1740 psi @ surface
(based on BHP and a full column of gas from TO @ 0.10 psi/ft)
.
.
Maximum anticipated BHP: 3500 ysi @ 6720' TVDss - Kuparuk
Maximum surface pressure: 2828 psi @ surface
(based on BHP and a full column of gas from TO @ 0.10 psi/ft)
.
.
Planned BOP test pressure:
Planned completion fluid:
3500 psi (the casing will be tested to 3500 psi)
Estimated 8.5 ppg Seawater / 6.8 ppg Diesel
.
Disposal
.
No annular injection in this well.
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject
at DS-04. Any metal cuttings will be sent to the North Slope Borough.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for
injection. Haul all Class I wastes to Pad 3 for disposal.
.
.
S-113A Permit to Drill
TREE: 4-1/16" - 5M Carbon
WELLHEAD: 13 5/8" '" 5M FMC SH
10-3/4",45.5 #/ft, L-80, BTC j
I 5587' I
Planned KOP from 10,100' to 10,300 MD
Base of West Sak / Top Colville Shale at
-10,608' MD
TO of 9-7/8" hole 114,440' I 1.......
Date
7/02102
Rev By
WSI
) )
S-113 Proposed Plug-Back
Cellar Elevation = 36.0'
Doyon 14 RKB = 70.33'
~
I
Top of 15.8 ppg Kick-off Plug at I 10,100' I
15.8 ppg Cement
Kick-off Plug
10.5ppgForm-A-Plug Top of Form-A-Plug pill at I 10,500' I
~~~ I I
; ì;,'WI Top of 10.8 ppg Mud Spacer at 10,750'
,.;>1 i'l
bJ- ',~i:
, ï 1\-' Tr
It,ll
*:~
111 I
Top of 15.8 ppg P&A Plug at I 13,440' I
Top Kuparuk Reservoir at I 13,818' I
15.8 ppg Cement
P&A Plug
Comments
Aurora
WELL: S-113
API NO: 50-029-23094
Proposed Plug Back for Sidetrack Operations
BP Alaska Drilling & Wells
TREE: 4-1/16" - 5M Carbon
WELLHEAD: 13 5/8" - 5M FMC SH
10-3/4",45.5 #/ft, L-80, BTC JI
I 5587' I
7",26 #/ft, L80, BTC-Mod
113,011' I ~
Date
7102102
Rev By
WSI
) )
S-113A Proposed Completion
.
I
L
L
L
L
if
4-1/2" tubing hanger
Cellar Elevation = 36.0'
Doyon 14 RKB = 70.33'
I 2350' I 4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 12.6# L-80 TC-II Tubing
~
4-1/2" Gas Lift Mandrels with handling pups installed.
_.__._,,-,_.__.__._.._..._-~-_._._"_.__.._-~_.._-_.-._-"..-~.'"-_.."-_._--~--,,_._-_...._.._--_.._._._---,-----_._,---
GAS LIFT MANDRELS
.. _..',0.'_." --' ----_. ".- ""'__'0."_"_- ~-_._~-_._------_._---------_._..._,.,----,_...__._-_....--,.-.,.....--..----".- ~..._,-
# TVD Size Valve Type
_.__._.'-----'--,~--,----,--"---,,,~,--_.,--------,-,-,-----------,.----'-----"'-----'-"--'...'-'W_-----'--.-.....,.....-
4 3800' 1" DV
3 5600' 1" DV
2 6600' 1" DV
1 One full joint 1" RP Shear
above packer
-~'-"-"',""---"-'-'-
.-"---...---.."--,,----- ,---,-_.----_._---,,-------,. ---.-.----......----'--
- _O-_h,"_O__O'---'-"."."-."'- "-""_0.' ___0_" ..0
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
7" x 4-1/2" Baker '8-3' Production Packer
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go 10.
4-1/2" WireLine Entry Guide at -12,385' (approximately 50' MD above the top Kuparuk).
Plug Back Depth I 12,910' I
...
Proposed Completion
Comments
Aurora
WELL: S-113A
API NO: 50-029-23094-01
BP Alaska Drilling & Wells
spe...,...,y-sur, North Slope Alaska
Ó~TLJ~TÑ-G~~'~~~~~~::;~ B PXA
Proposal Data for S-113A WP02
Scale: 1 inch = 400ft
-9600 -9200
I I
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
5-113
5-113
It
True North
Dogleg severity: Degrees per 100 feet (US)
Vertical Section Azimuth: 268.570°
Vertical Section Description: S-113
Vertical Section Origin: 0.00 N,O.OO E
Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg
Depth Depth Section Rate
I (ßOO.OO 68AO.1 283.118 5132.9X 1919.64 N 7957.27 W 7906.89
11761..ì'J 20.150 254.484 6156.'.15 2012.7'.1 1\1 8926.87 W XX73.86 3.503
12436.07 20.150 254.484 (,7 <)O..B IlJ50.61 N 9150.82 W 90lJ9.2<) 0.000
13011.28 20.150 254.484 7330.D IX97.61 N 9341.74 W <)291.48 0.000
PBU_WOA S Pad
S-113A WP02
Eastings (8-113)
-8800
I
DrillQuest
-8400
I
-8000
I
- 2600
ST Exit: Dir @ 3.503°/100ft, 192.23°
F : 1 0300.00ft MD, 5132.98ft TVD
Begin 9-7(8" Hole
\ - 2200
cry
T""'"
T""'"
~
s- n!oi Tf
(
~_/
- 1800 :c
t
0
Z
.::::
0
0
.q-
II
.c
ü
- 1400 ~
å5
ëU
ü
CJ)
--~~~~:~ ~-
6?f;fj-3_~!} Tl'!]
!~5f!-6í s. :;!5:tJ.S?: H-"
Total Depth: 13011.28ftMD,7330.33ftTVD
End Dir, Start Sail @ 20.150°: 1761.39ftMD,6156.95ftTVD
Begin 9-7/8" Hole
ST Exit: Dir @ 3.503°/100ft, 192.23° TF: 10300.00ft MD, 5132.98ft TVD
5200 -
End Dir, Start Sail @ 20.150° : 11761.39ftMD,6156.95ftTVD
'-""""'"
"'....;::":,~~""'~,~""
-"<:~~'''Z
~,
"'--.,.,. ,.. .."
"'~,
""
"-,
",'OC .
""
'",
~'\
'^
'1;<
~5~\.
i,,,~\ """"
cry
T""'"
T""'"
~
It
Coordinate
Point
Type
Measurerænt Units :
Target
Name
S-113ATI
Entry Point
6000 -
Boundary Point A
B
C
D
s::.
ã.
()
0
~
()
'-2
()
> 8 6800
0
CO
II
J::
Ü
.~
.').j! ':.1 TJ
t;::;rf. '!3!i 11-1 j
('iSfJ.l.J S. f;!5;¡.,~) ~\
.",-:v; ! j ,{ T f G::iJ r¡~{.,.-
()
ëU
ü
CJ) 7600 - I ¡
7600 8400
Scale: 1 inch = 800ft
7" Casing
t 3011.2811 MD
7330.3311 TVD Total Depth: 13011.28ftMD, 7330.33ftTVD
I I I
10000 10800 11600
Section Azimuth: 268.570° (True North)
Vertical Section (8-113)
I
9200
,",,-,""""" --",.. ^^,...'"' ^..."
Single Well Target Data for S-113A WP02
TVD Northings Eastings SSTVD Northings Eastings Target
ASPY ASPX Shape
ó790.33 1950.61 N 9150.82 \V fiì20.oo 598255O.(X) N 609750.m E Polygon
ó7,)(133 2078.38 N 9323.81 W 6720.(x) 5982675.00 N 609575.00 E
6790.3:1 2074.81 N 9008.84 W óì20.oo 5%"2615.O'J N 6098(X).OO E
6790.33 1849.83 N 9102.41 W 6ì20.oo 5982450.m N Ó09800.CX) E
671JO.33 1853.41 N 9327.38 \V fi720.(X) 5982450.00 N 609575.00 E
---
Current Well Properties
S-113A WP02
5980744.91 N, 618930.63 E
127.41 S, 1012.02 E
70° 21' 21.7672" N, 149° 02' 02.8492" W
Well:
Horizontal Coordinates:
Ref. Globaf Coordinates:
Ref. Structure Reference:
Ref. Geographical Coordinates:
RKB Elevation:
70.33ft above Mean Sea Level
70.33ft above Structure Reference
North Reference:
Units:
True North
Feet (US)
-1
2
3T
MD Delta
(ft) M 0 (ft)
I 10300.001
11761.39 1461.39
12436~07 .674;68
1.3011 ;2~L~~_§??;21j
4'
1 July, 2002 - 13:46
Sperl yl.Sun Drilling Sel )ices
Proposal Data - 5-113 WP5 - 5-113A WP02
Draft Copy
Inclin. Azimuth TVD
n (°) (ft)
68040J 283.12.5132.98
20.15 . 254.48 6156;95
20.15 254.48 6790.33
20;15: . 254.48i 7330.331
.,. .." ' "'''' 1.".,..,....".,,,,...,..,,..1
Delta
TVD (ft)
1023.96
633;38
540.0Ói
,,:. ......,,,1.
Northings
(tt)
1919.64N]
2012.79N.
1950.61 N
1~97:.€)~.'N: '.
Eastings Dogleg
(ft) (0/100ft)
i957.27-W! / i
8926.87 W 3.50
9150.82 W 0.00
9341.74W, 0.00
- 1 -
A. Build A. Turn Toolface
(0/100ft) (°11 OOft) (°)
-3.30
0.00
0.00'
-1.96
0.00
0.001
192.23
0.00
0.00
VS (269°)
(ft)
7906.9
8873.9
9099.3
9291.5
DrillQuest
~'
North ~lop~Afàskå
8"~1t
PIP:IlIlYC!ilA 5 Pad, 510t 5-113
$'...113<WP5 - 5-113A WP02
Revised: 1 July, 2002
PROPOSAL REPORT
1 July, 2002
-
Surface Coordinates: 5980744.91 N, 618930.63 E (70021'21.7672" N, 149002' 02.8492" W)
Surface Coordinates relative to Project H Reference: 980744.91 N, 118930.63 E (Grid)
Surface Coordinates relative to Structure Reference: 127.41 S, 1012.02 E (True)
Kelly Bushing: 70.33ft above Mean Sea Level
sper"'¡-t~-sufl
DRtLLING seRVIc::es
A Halliburton Company
Proposal Ref: pr011229
Sperry-Sun Drilling Services
Proposal Report for 5-113 WP5
Revised: 1 July, 2002
BPXA
North Slope Alaska PBU_WOA S Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r/1 DOft)
5-113 Rig MWD+IFR+M5
0.00 0.000 0.000 -70.33 0.00 0.00 N 5980744.9tN 618930.63 E 0.00
100.00 0.568 78.000 29.67 100.00 0.10 N 5980745.02N 618931.11 E 0.568 -0.49
200.00 0.766 52.231 129.66 199.99 0.55 N 5980745;49 N 618932.26 E 0.354 -1.65
300.00 1.066 352.413 229.65 299.98 1.86 N 5980746;80 N 618932.75 E 0.950 -2.19
400.00 2.266 298.490 329.61 399.94 3.78 N 5980748.70 N 618930.95 E 1.851 -0.47
500.00 4.314 277.883 429.44 499.77 S,33N 5.18W 5980750.16 N 618925.37 E 2.333 5.05
600.00 5.702 262.617 529.08 599.41 5.00N 13.55 W 5980749.69 N 618917.00 E 1.912 13.42
700.00 8.983 265.474 628.27 698.60 3.66 N 26.09 W 5980748.16 N 618904.48 E 3.301 26.00
800.00 12.393 270.168 726.47 796.80 2.84 N 44.87 W 5980747.04 N 618885.72 E 3.516 44.79
900.00 14.660 281.840 823.65 893.98 4.72 N 68.31 W 5980748.54 N 618862.25 E 3.538 68.18
1000.00 16.558 292.871 919.96 990.29 13.52 N 93.68 W 5980756.94 N 618836.75 E 3.515 93.31
1100.00 20.393 292.486 1014.72 1 085.05 25.85 N 123.09 W 5980768.80 N 618807.15 E 3.837 122.40
1200.00 22.413 291. 004 1107.79 1t78.12 39.42 N 157.04 W 5980781 .83 N 618772.99 E 2.091 156.00
1300.00 24.193 289.267 1199.69 1270.02 52.88 N 194.08 W 5980794.70 N 618735.74 E 1.908 192.69
1400.00 26.591 288.364 1289.98 1360.31 66.85 N 234.72 W 5980808.03 N 618694.88 E 2.428 232.98
1500.00 30.147 286.482 1378.37 1448.70 80.82 N 279.30 W 5980821.29 N 618650.08 E 3.666 277.20
1600.00 34.323 285.469 1462.31 1532.64 95.60 N 331.56 W 5980835.23 N 618597.60 E 4.211 329.07
1700.00 36.039 285.750 1544.27 1614.60 110.88 N 386.76 W 5980849.64 N 618542.16E 1.723 383.87
1800.00 40.026 286.448 1623.36 1693.69 127.89 N 445.52 W 5980865.71 N 618483.14 E 4.010 442.19
1900.00 44.689 285.449 1697.07 1767.40 146.84 N 510.34 W 5980883.63 N 618418.02 E 4.711 506.52
2000.00 47.477 284.405 1766.06 1836.39 165.17 N 580.35 W 5980900.85 N 618347.73 E 2.888 576.05 --
2100.00 47.790 283.633 1833.08 1903.41 183.29 N 652.33 W 5980917.82 N 618275.48 E 0.651 647.55
2200.00 48.394 283.515 1900.14 1970.47 200.48 N 724.49 W 5980933.86 N 618203.05 E 0.610 719.26
2300.00 51.934 284.140 1964.66 2034.99 218.70 N 798.66 W 5980950.91 N 618128.60 E 3.572 792.95
2400.00 54.354 281.948 2024.24 2094.57 237.33 N 876.77 W 5980968.29 N 618050.21 E 2.989 870.57
2500.00 56.794 280.731 2080.89 2151.22 253.22 N 957.61 W 5980982.90 N 617969.12 E 2.638 951.00
2600.00 59.482 280.081 2133.68 2204.01 268.56 N 1041.14 W 5980996.90 N 617885.36 E 2.744 1034.11
2700.00 59.843 280.548 2183.93 2254.26 283.92 N 1126.22 W 5981010.91 N 617800.05 E 0.541 1118.78
2800.00 59.176 279.443 2234.63 2304.96 299.01 N 1211.08 W 5981024.65 N 617714.95 E 1.163 1203.24
2900.00 61.467 278.805 2284.28 2354.61 312.73 N 1296.78 W 5981037.02 N 617629.05 E 2.357 1288.57
1 July, 2002 - 13:48
Page 2 of 8
Drill Quest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for 5-113 WP5
Revised: 1 July, 2002
BPXA
North Slope Alaska PBU_WOA S Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) C/1 OOft)
3000.00 62.275 278.836 2331.40 2401.73 326.23 N 1383.95 W 5981049.12 N 617541.68 E 0.808 1375.38
3100.00 63.012 280.394 2377.29 2447.62 340.99 N 1471.56 W 5981062.49 N 617453.84 E 1.567 1462.59
3200.00 62.703 283.471 2423.11 2493.44 359.56 N 1558.46 W 5981079.69N 617366.65 E 2.756 1549.01
3300.00 65.494 284.051 2467.20 2537.53 380.79 N 1645.67 W 5981099.53N 617279.12 E 2.839 1635.65
3400.00 70.825 285.376 2503.67 2574.00 404.63 N 1735.62 W 5981121,93 N 617188.80 E 5.470 1724.99
3500.00 70.833 285.191 2536.12 2606.45 429.73 N 1826.82 W 5981145r58 N 617097.22 E 0.174 1815.53 .~
3600.00 69.221 284.505 2570.55 2640.88 453.54 N 1917.63W 5981167.95 N 617006.04 E 1.736 1905.72
3700.00 68.715 284.908 2606.38 2676.71 477.27N 2007.93W 5981190.24 N 616915.38 E 0.631 1995.39
3800.00 68.054 285.105 2643.26 2713.59 501.38N 2097.69 W 5981212.93 N 616825.24 E 0.685 2084.53
3900.00 67.290 285.291 2681.12 2751.45 525.58 N 2187.03 W 5981235.70 N 616735.53 E 0.783 2173.23
4000.00 67.1 82 284.634 2720.30 2790.63 549:80 N 2275.79 W 5981258.51 N 616646.40 E 0.616 2261.36
4100.00 67.980 283.670 2758.23 2828.56 57.1.99 N 2365.62 W 5981279.27 N 616556.23 E 1.196 2350.60
4200.00 67.768 283.543 2795.71 2866.04 593.91 N 2455.70 W 5981299.76 N 616465.81 E 0.243 2440.11
4300.00 67.754 282.998 2833.78 2904.11 615.18 N 2545.68 W 5981319.60 N 616375.50 E 0.505 2529.54
4400.00 67.81 8 282.552 2871.45 2941.78 635.61 N 2636.04 W 5981338.59 N 616284.83 E 0.418 2619.36
4500.00 66.904 282.393 2909.74 2980.07 655.51 N 2726.25 W 5981357.06 N 616194.32 E 0.926 2709.04
4600.00 67.774 282.760 2948.81 3019.14 675.45 N 2816.11 W 5981375.57 N 616104.15 E 0.933 2798.38
4700.00 69.035 283.297 2985.49 3055.82 696.43 N 2906.74 W 5981395.10 N 616013.20 E 1.357 2888.46
4800.00 69.186 283.074 3020.99 3091.32 717.88 N 2997.73 W 5981415.11 N 615921.88 E 0.257 2978.89
4900.00 69.543 283.243 3056.29 3126.62 739.10 N 3088.86 W 5981434.87 N 615830.43 E 0.390 3069.45
5000.00 69.934 283.289 3090.92 3161.25 760.65 N 3180.16 W 5981454.97 N 615738.79 E 0.394 3160.19
5100.00 69.349 283.108 3125.63 3195.96 782.08 N 3271.46 W 5981474.95 N 615647.16 E 0.609 3250.93
5200.00 68.730 283.360 3161.41 3231.74 803.44 N 3362.37 W 5981494.87 N 615555.93 E 0.662 3341 .27
5300.00 68.512 283.393 3197.87 3268.20 824.99 N 3452.95 W 5981514.97 N 615465.01 E 0.220 3431 .29 .~
5400.00 68.639 283.342 3234.45 3304.78 846.43 N 3543.52 W 5981534.97 N 615374.12 E 0.135 3521.29
5500.00 69.579 284.496 3270.07 3340.40 868.91 N 3634.21 W 5981556.02 N 615283.08 E 1.431 3611.40
5600.00 69.730 284.840 3304.75 3375.08 892.85 N 3724.90 W 5981578.51 N 615192.02 E 0.356 3701.46
5700.00 67.523 283.147 3341.77 3412.10 914.76 N 3815.17 W 5981598.99 N 615101.42 E 2.712 3791.15
5800.00 67.792 284.490 3379.89 3450.22 936.72 N 3904.97 W 5981619.51 N 615011.28 E 1.271 3880.38
5900.00 67.638 285.107 3417.80 3488.13 960.37 N 3994.43 W 5981641.74 N 614921.46 E 0.592 3969.22
1 July, 2002 - 13:48
Page 3 of 8
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for 5-113 WP5
Revised: 1 July, 2002
BPXA
North Slope Alaska PBU_WOA S Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
6000.00 67.326 284.669 3456.11 3526.44 984.12 N 4083.70 W 5981664.07 N 614831.82 E 0.511 4057.87
6100.00 67.283 283.956 3494.70 3565.03 1006.93 N 4173.08 W 5981685A6N 614742.09 E 0.659 4146.66
6200.00 67.345 283.318 3533.22 3603.55 1 028.59 N 4262.79 W 5981.705.70N B14652.05 E 0.592 4235.79
6300.00 66.898 283.569 3572.06 3642.39 1049.98 N 4352.42 W 5981725.66N 6~4562.09 E 0.504 4324.86
6400.00 66.565 284.022 3611.81 3682.14 1071.89 N 444J.53 W 5981746,J5N 614472.65 E 0.532 4413.39
67.646 284.436 3650.66 3720.99 1094.46 N 4530.86 W 5981767,30 N 614382.97 E -'
6500.00 1.146 4502.14
6600.00 68.417 285.072 3688.05 3758.38 1118.16 N 4620.53W 5981789.57 N 614292.93 E 0.971 4591 .19
6700.00 68.728 285.141 3724.39 3794.72 1142.57N 4710.44W 5981812.55 N 614202.65 E 0.317 4680.46
6800.00 68.320 284.876 3761.00 3831.33 1166.S9N 4800:34 W 5981835.14 N 614112.37 E 0.476 4769.73
6900.00 67.827 284.883 3798.30 3868.63 1190.41N 4890.01 W 5981857.53 N 614022.33 E 0.494 4858.78
7000.00 68.089 284.352 3836.20 3906.53 J214,00 N 4979.50 W 5981879.70 N 613932.49 E 0.558 4947.65
7100.00 68.544 283.349 3872.85 3943.18 J236.21 N 5069.85 W 5981900.47 N 613841.79 E 1.037 5037.42
7200.00 68.630 283.052 3909.48 3979.81 1257.26 N 5160.48 W 5981920.08 N 613750.84 E 0.290 512?-50
7300.00 69.276 283.337 3945.49 40J5.82 1278.51 N 5251.32 W 5981939.89 N 613659.67 E 0.699 5217.78
7400.00 68.609 282.287 3981.01 4051.34 1299.62 N 5342.38 W 5981959.55 N 613568.29 E 1.185 5308.29
7500.00 67.889 280.324 4018.24 4088.57 1317.86 N 5433.38 W 5981976.34 N 613477.02 E 1.960 5398.80
7600.00 66.814 279.540 4056.60 4126.93 1333.51 N 5524.39 W 5981990.55 N 613385.77 E 1.296 5489.39
7700.00 66.794 279.096 4096.23 4166.56 1 348.40 N 5614.99 W 5982004.00 N 613294.94 E 0.408 5579.59
7800.00 67.821 280.588 4134.90 4205.23 1 363.89 N 5705.89 W 5982018.04 N 613203.81 E 1.717 5670.08
7900.00 68.088 281.697 4172.33 4242.66 1381.90 N 5796.85 W 5982034.60 N 613112.57 E 1.062 5760.56
8000.00 68.165 281.847 4209.58 4279.91 1400.90 N 5887.69 W 5982052.1 6 N 613021.44 E 0.159 5850.90
8100.00 68.376 281.261 4246.61 4316.94 1419.54 N 5978.69 W 5982069.35 N 612930.15 E 0.583 5941.41
8200.00 69.760 281.191 4282.35 4352.68 1437.72 N 6070.30 W 5982086.08 N 612838.27 E 1.386 6032.53
8300.00 70.275 280.808 4316.43 4386.76 1455.51 N 6162.61 W 5982102.40 N 612745.68 E 0.628 6124.37 ----J
8400.00 70.262 280.735 4350.46 4420.79 1473.60 N 6254.89 W 5982119.02 N 612653.14 E 0.069 6216.17
8500.00 70.004 282.823 4384.36 4454.69 1492.41 N 6347.06 W 5982136.36 N 612560.67 E 1.981 6307.84
8600.00 68.648 281 .490 4419.57 4489.90 1512.50 N 6438.4 7 W 5982155.00 N 612468.96 E 1.842 6398.72
8700.00 67.774 280.071 4456.73 4527.06 1529.84 N 6529.67 W 5982170.89 N 612377.49 E 1.581 6489.46
8800.00 66.869 282.910 4495.29 4565.62 1 548.16 N 6620.09 W 5982187.77 N 612286.80 E 2.771 6579.39
8900.00 66.182 281.878 4535.17 4605.50 1567.60 N 6709.71 W 5982205.79 N 612196.88 E 1.170 6668.50
1 July, 2002 - 13:48
Page 4 of 8
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for 5-113 WP5
Revised: 1 July, 2002
BPXA
North Slope Alaska PBU_WOA S Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 DOft)
9000.00 66.207 284.956 4575.51 4645.84 1 588.98 N 6798.66 W 5982225.75..N 612107.60 E 2.817 6756.89
9100.00 66.103 286.1 58 4616.05 4686.38 1613.64 N 6886.68 W 5982249.01N 612019.20 E 1.104 6844.27
9200.00 66.879 286.411 4655.90 4726.23 1639.19 N 6974.77 W 5982273.17N 611930.72 E 0.810 6931.69
9300.00 67.451 287.430 4694.75 4765.08 1 666.19 N 7062.87 W 5982298.76 N 611842.20 E 1.099 7019.09
9400.00 68.253 287.520 4732.46 4802.79 1693.97 N 715J.22 W 5982325.14 N 611753.42 E 0.807 7106.72
7240.01 W 611664.20 E ~-
9500.00 68.913 287.493 4768.86 4839.19 1 722.11 N 5982351.86 N 0.660 7194.77
9600.00 68.831 286.870 4804.74 4875.07 1749.75 N 7329.16W 5982378.08 N 611574.61 E 0.587 7283.21
9700.00 68.440 286.292 4841.30 4911.63 1776. raN 7418.41W 5982403.09 N 611484.96 E 0.665 7371.77
9800.00 68.190 285.679 4878.13 4948.46 180J.98N 7507.72 W 5982427.4 7 N 611395.24 E 0.622 7460.42
9900.00 68.192 284.883 4915.52 4985.85 1826.27 N 7597.23 W 5982450.34 N 611305.36 E 0.739 7549.29
10000.00 68.458 284.684 4952.32 5022.65 1849.93 N 7687.15 W 5982472.56 N 611215.07 E 0.325 7638.59
10100.00 68.452 284.688 4989.06 5059.39 1873.49 N 7777.13 W 5982494.70 N 611124.74 E 0.007 7727.95
10200.00 68.397 284.581 5025.81 5096.14 1897.03 N 7867.10 W 5982516.81 N 611034.40 E 0.113 7817.31
10300.00 68.404 283.118 5062.65 5132.98 1919.64 N 7957.27 W 5982537.98 N 610943.88 E 1.360 7906.89 ST Exit: Dir @ 3.503°/100ft,
192.23° TF: 10300.00ft MD,
5132.98ft TVD
$-113A WP02 /
10400.00 64.983 282.300 5102.21 5172.54 1939.85 N 8046.85 W 5982556.76 N 610854.00 E 3.503 7995.93
10500.00 61.566 281.434 5147.18 5217.51 1 958.22 N 8134.24 W 5982573.75 N 610766.33 E 3.503 8082.84
10600.00 58.154 280.511 5197.38 5267.71 1974.69 N 8219.12 W 5982588.87 N 610681.19 E 3.503 8167.28
10700.00 54.751 279.517 5252.64 5322.97 1989.20 N 8301 .18 W 5982602.07 N 610598.92 E 3.503 8248.95
10800.00 51 .355 278.436 5312.74 5383.07 2001.68 N 8380.10 W 5982613.30 N 610519.81 E 3.503 8327.54
10900.00 47.971 277.247 5377.46 5447.79 2012.10 N 8455.60 W 5982622.51 N 610444.15 E 3.503 8402.75 '-'
11000.00 44.601 275.925 5446.56 5516.89 2020.41 N 8527.39 W 5982629.68 N 610372.24 E 3.503 8474.31
11100.00 41.247 274.435 5519.77 5590.10 2026.59 N 8595.19 W 5982634.78 N 610304.35 E 3.503 8541.94
11200.00 37.916 272.733 5596.84 5667.17 2030.60 N 8658.77 W 5982637.79 N 610240.71 E 3.503 8605.40
11300.00 34.613 270.757 5677.46 5747.79 2032.44 N 8717.88 W 5982638.69 N 610181.58 E 3.503 8664.44
11400.00 31 .348 268.423 5761.34 5831.67 2032.10 N 8772.30 W 5982637.49 N 610127.18 E 3.503 8718.85
11500.00 28.133 265.611 5848.16 5918.49 2029.58 N 8821.82W 5982634.18 N 610077.70 E 3.503 8768.42
11600.00 24.990 262.147 5937.60 6007.93 2024.89 N 8866.27 W 5982628.78 N 610033.33 E 3.503 8812.97
11700.00 21.948 257.776 6029.32 6099.65 2018.04 N 8905.47 W 5982621.32 N 609994.25 E 3.503 8852.33
11761.39 20.150 254.484 6086.62 6156.95 2012.79 N 8926.87 W 5982615.72 N 609972.93 E 3.503 8873.86 End Dir, Start Sail @ 20.150° :
11761.39ftMD,6156.95ftTVD
1 July, 2002 - 13:48
Page 5 of 8
DrillQuest 2.00.09.006
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(1t) (ft) (ft)
11800.00 20.1 50 254.484 6122.86 6193.19
11900.00 20.150 254.484 6216.74 6287.07
12000.00 20.150 254.484 6310.62 6380.95
12100.00 20.150 254.484 6404.50 6474.83
12200.00 20.150 254.484 6498.38 6568.71
12300.00 20.150 254.484 6592.26 6662.59
12400.00 20.150 254.484 6686.14 6756.47
12436.07 20.150 254.484 6720.00 6790.33
12500.00 20.150 254.484 6780.02 6850.35
12600.00 20.150 254.484 6873.90 6944.23
12700.00 20.150 254.484 6967.77 7038.10
12800.00 20.1 50 254.484 7061.65 7131.98
12900.00 20.150 254.484 7155.53 7225.86
13000.00 20.150 254.484 7249.41 7319.74
13011.28 20.150 254.484 7260.00 7330,33
Sperry-Sun Drilling Services
Proposal Report for 5-113 WP5
Revised: 1 July, 2002
BPXA
PBU _WOA S Pad
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (°/1 OOft)
2009.23 N 8939.69 W 5982611 .96N 609960.17 E 0.000 8886.76
2000.01 N 8972.88 W 5982602.22N 609927.13 E 0.000 8920.17
1 990.80 N 9006.07 W 5982592.48N '609894.09 E 0.000 8953.59
1981.58 N 9039.26 W 5982582.74N 609861.04 E 0.000 8987.00
1972.37 N 9072.46 W 5982572.99N 609828.00 E 0.000 9020.41
1 963.15 N 9105.65 W 5982563:25 N 609794.96 E 0.000 9053.82 ---
1953.94 N 9138.84W 5982553.51 N 609761.92 E 0.000 9087.23
1950.6J'N 9150.82W 5982550.00 N 609750.00 E 0.000 9099.29 Target - S-113A T1, Drillers
1944..72N 9172:03 W 5982543.77 N 609728.88 E 0.000 9120.65
1935.51N 9205.23 W 5982534.03 N 609695.83 E 0.000 9154.06
1926:29. N 9238.42 W 5982524.29 N 609662.79 E 0.000 9187.47
1917.08 N 9271.61 W 5982514.55 N 609629.75 E 0.000 9220.88
1907.86 N 9304.81 W 5982504.81 N 609596.71 E 0.000 9254.30
1898.65 N 9338.00 W 5982495.07 N 609563.67 E 0.000 9287.71
1897.61 N 9341.74 W 5982493.97 N 609559.94 E 0.000 9291.48 Total Depth:
13011.28ftMD,7330.33ftTVD
7" Casing
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to S-113. Northings and Eastings are relative to S-113.
Magnetic Declination at Surface is 26.144° (01-Jul-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from S-113 and calculated along an Azimuth of 268.570° (True).
-
Based upon Minimum Curvature type calculations, at a Measured Depth of 13011.28ft.,
The Bottom Hole Displacement is 9532.53ft., in the Direction of 281.482° (True).
1 July, 2002 - 13:48
Page 6 of 8
Drill Quest 2.00.09.006
H 206930
')
)
DATE
OS/28/02
CHECK NO.
H206930
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
NET
5/23/02
CK052302M
Permit To Drill Fee
$100.00
PIs call Terrie Hubble X4628
8 -l n/\
ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
$100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H 208930
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
4i2
PAY
B ~..'.":".""" r;!)"',',',,",',',',',';,... f"IIII) ,lfllll f"'~I' "¡
lit" "., I ( l ",. f",,'
" . (". .. ,..h, I/J', tnt. ."...., .."'tl.
AMOUNT
***May28., 2002**
*****$100.00******
TO THE
ORDER
OF
AI~skacOil& Gas
COnservation Commission
333 W' 7th Ave, Ste 100
Anchorage, AI< 99501
NOTVALlDAFTER 120 DAYS
ç¿"'" ""',"',-'~'7"-"'~'~'" .,",">"
:'" '.'","',. ",' "", ' ,
..... (.~J~!!:/~-:;'
III 2 0 b Eì j 0 III I: 0 L. ~ 2 0 j a ~ 5 I: 0 0 a a.... ~ ~ III
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
DEVELOPMENT
REDRILL
x
EXPLORA TION
INJECTION WELL
INJECTION WELL
REDRILL
Rev: 6/18/02
C\jody\templates
) )
TkANSMIT AL LETTER CHECK LIS1
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME S - /J 3 A
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MUL TI LATERAL
(If API number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
"CLUE"
The permit is for a new well bore segment of existing well
~ Permit No, API No.
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(t), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
ANNULAR DISPOSAL Please note that an disposal of fluids generated. . .
INTO ANNULUS OF
ANOTHER WELL ON
SAME PAD
<->
SPACING EXCEPTION
DRY DITCH SAMPLE
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Companv Name) will assume the liability of any protest to
the spacing exception that may occur.
All dry ditch sample sets submitted to the Commission must
be in no greater than 30' sample intervals from below the
permafrost or from where samples are first caught and 10'
sample intervals through target zones.
WELL PERMIT CHECKLIST COMPANY ß/J,X WELL NAME¡JL9¿¡ ,-)-/13'¡::¡
. ~
FIELD & POOL b YO/ :;? () INIT CLASS ()e"I/ ) .. n; I
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . .
2. Lease number appropriate. . . . . . . . . . . . . . . . . . .
3. Unique well name and number. .. . . . . . . . . . . . . . . .
4. Well located in a defined pool.. . . . . . . . . . . . . . . . .
5. Well located proper distance from drilling unit boundary. . . .
6. Well located proper distance from other wells.. . . . . . . . .
7. Sufficient acreage available in drilling unit.. . . . . . . . . . .
8. If deviated, is well bore plat included.. . . . . . . . . . . . . .
9. Operator only affected party.. . . . . . . . . . . . . . . . . .
10. Operator has appropriate bond in force. . . . . . . . . . . . .
11. Permit can be issued without conservation order. . . . . . . .
12. Permit can be issued without administrative approval.. . . . .
13. Can permit be approved before 15-day wait.. . . . . . . . . .
14. Conductor string provided. . . . . . . . . . . . . . . . . . .
15. Surface casing protects all known USDWs. . . . . . . . . . .
16. CMT vol adequate to circulate on conductor & surf csg. . . . .
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . .
18. CMT will cover all known productive horizons. . . . . . . . . .
19. Casing designs adequate for C, T, B & permafrost. . . . . . .
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . .
21. If a re-drill, has a 10-403 for abandonment been approved. . .
22. Adequate well bore separation proposed.. . . . . . . . . .-. .
23. If diverter required, does it meet regulations. . . . . . . . . .
24, Drilling fluid program schematic & equip list adequate. . . . . N
25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N/L.J-. f.-
APPg Df TE 26. BOPE press rating appropriate; test to '3$00 psig. N (l.( So P z f z f ,ç,', tZ< «-¥ '-fII/ ~ ke;. L "3 S" 00 r u .
!;J4¡;r 1(3( OL 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
28. Work win occur without operation shutdown. . . . . . . . . . . . ;6'. N . ,.
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . .ßIoC.
30. Permit can be issued wlo hydrogen sulfide measures. . . .. )rfYl N
31. Data presented on potential overpressure zones. . . . . . . Y N /J} /?
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y / (/, H .
) AÆR j)~1E 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . N
Ifrc 7! 1/0? J 34. Contact namelphone for weekly progress reports [exploratory on" Y N
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface;
(C) will not impair mechanical integrity of the well used for disposal;
(D) will not damage producing formation or impair recovery from a
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412.
GEOLOGY: ENGINEERING: UIC/Annular: CO
RP~ JDH Jt;f $-
WGA vJ&I\
A~ D~T5
/5ff J rl/d ~
} ENGINEERING
. GEOLOGY
APPR DATE
~~ #<-
PROGRAM: Exp - Oev){... Redrll À Serv - We"bor~ seg - Ann. disposal para req -
GEOLAREA <r9,A UNIT# //6 Sf) ON/OFF SHORE nA)
r" ~
y. N
Y N
Y N
~ ~
Y N
Y N
Y N
Y N
Y N
Y N
Y N
\L N
~~
-¥--N.Ai!1r
~D
~~ ~~Iq
^'/tr
Comments/l nstructions:
COT' .
DTsð7fií /0 2-
G:\geology\permits\checklist. doc
)
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process.
but is part of the history file.
To improve the readability of the Well History file and to
simpHfy finding infonnation, infonnation of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Thu Aug 08 06:21:30 2002
Reel Header
Service name..... ....... .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/08
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name... ........ .... . UNKNOWN
Continuation Number..... .01
Previous Reel Name..... ..UNKNOWN
Comments............... ..STS LIS
J
Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/08
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.... ........... . UNKNOWN
Continuation Number.... ..01
Previous Tape Name..... ..UNKNOWN
Comments................ .STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
Writing Library. Scientific Technical Services
MWD RUN 1
AK-MW-22095
T. MCGUIRE
A. MADSEN
MWD RUN 4
AK-MW-22095
C.A. DEMOSKI
A. MADSEN
MSL 0)
S-113A
500292309401
BP Exploration
Sperry Sun
07-AUG-02
MWD RUN 2
AK-MW-22095
C.A. DEMOSKI
A. MADSEN
MWD RUN 5
AK-MW-22095
T. MCGUIRE
L. VAUGHN
35
12N
12E
738
783
.00
70.33
36.00
(Alaska), Inc.
MWD RUN 3
AK-MW-22095
C.A. DEMOSKI
A. MADSEN
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
13.500 10.750 5587.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
aOd-/Ya
10O¡ 'ô3
)
STATED.
2. MWD RUNS 1 & 2 ARE DIRECTIONAL WITH NATURAL GAMMA
PROBE (NGP)
UTILIZING A SCINTILLATION DETECTOR.
3. MWD RUN 3 IS DIRECTIONAL
UTILIZING GEIGER
MUELLER TUBE DETECTORS,
RESISTIVITY PHASE 4
(EWR4) .
WITH DUAL GAMMA RAY (DGR)
AND ELECTROMAGNETIC WAVE
4. MWD RUNS 4 & 5 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND
STABILIZED LITHO-DENSITY (SLD).
5. GAMMA RAY (SGRC) IS LOGGED BEHIND CASING FROM 5528'
MD, 3350' TVD TO
5587' MD, 3371' TVD.
6. FOR LOG DATA ABOVE THE KICKOFF POINT REFERENCE THE
LOG FOR S-113.
7. DEPTH SHIFTING / CORRECTION WAIVED PER THE EMAIL
FROM
D. SCHNORR OF 07/16/02. MWD CONSIDERED PDC.
WELL S-113A IS TIED INTO S-113 AT THE KICKOFF
POINT.
THIS WELL KICKS OFF FROM S-113 AT 10095' MD, 5058'
TVD.
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
8. MWD RUNS 1 - 5 REPRESENT WELL S-113A WITH
API # 50-029-23094-01. THIS WELL REACHED A TOTAL
DEPTH OF
12640' MD, 6990' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN)
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT
BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW-COUNT BIN)
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY
(SANDSTONE MATRIX, FIXED HOLE SIZE)
SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
RATE
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
RATE
ENVIRONMENTAL PARAMETERS USED IN PROCESSING THE
NEUTRON LOG DATA:
HOLE SIZE:
9.875"
MUD WEIGHT:
10.25 PPG
MUD FILTRATE
CHLORIDES
9.40 -
SALINITY:
350 - 700 PPM
FORMATION WATER SALINITY:
FLUID DENSITY:
G/CC
MATRIX DENSITY:
20,000 PPM CHLORIDES
1. 00
$
LITHOLOGY:
SANDSTONE
2.65 G/CC
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/08
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPX
RPS
RPM
RPD
NPHI
FCNT
NCNT
RHOB
PEF
DRHO
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
45.0
115.5
5567.0
5567.0
5567.0
5567.0
5567.0
8300.0
8300.0
8300.0
8300.0
8300.0
8300.0
STOP DEPTH
12591.0
12640.0
12583.5
12583.5
12583.5
12583.5
12583.5
12542.5
12542.5
12542.5
12552.0
12552.0
12552.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED
PBU
MWD
MWD
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
#
REMARKS:
BIT RUN NO
1
2
3
4
5
MERGED MAIN PASS.
$
MERGE TOP
45.0
1485.5
5600.5
8384.5
10095.5
MERGE BASE
1485.0
5600.0
8384.0
10095.0
12640.0
#
Data Format Specification Record
Data Record Type... .,.. ..... ......0
Data Specification Block Type.....O
Logging Direction..... ........... . Down
Optical log depth units.... ..... ..Feet
Data Reference Point... ....... ... .Undefined
Frame Spacing..... .......... ..... .60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CP30 4 1 68 36 10
NCNT MWD CP30 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 45 12640 6342.5 25191 45 12640
ROP MWD FT/H 0.05 4382.62 213.276 25050 115.5 12640
GR MWD API 7.48 338.18 73.1414 25093 45 12591
RPX MWD OHMM 0.69 127.95 5.66615 14034 5567 12583.5
RPS MWD OHMM 0.57 300.22 5.82535 14034 5567 12583.5
RPM MWD OHMM 0.61 2000 7.00274 14034 5567 12583.5
RPD MWD OHMM 0.66 2000 8.55665 14034 5567 12583.5
FET MWD HR 0.08 57.36 1.12606 14034 5567 12583.5
NPHI MWD PU-S 15.24 61.89 35.1493 8486 8300 12542.5
FCNT MWD CP30 433.5 923 552.422 8486 8300 12542.5
NCNT MWD CP30 2224 3180.48 2646.4 8486 8300 12542.5
RHOB MWD G/CM 1.291 3.17 2.28819 8505 8300 12552
DRHO MWD G/CM -0.171 0.77 0.0601367 8505 8300 12552
PEF MWD B/E 1.18 11.18 3.82431 8505 8300 12552
First Reading For Entire File........ ..45
Last Reading For Entire File.......... .12640
File Trailer
Service name........... ..STSLIB.001
Service Sub Level Name...
Version Number... ....... .1.0.0
Date of Generation...... .02/08/08
Maximum Physical Record..65535
File Type.............. ..LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/08
Maximum Physical Record. .65535
File Type........ ....... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
45.0
115.5
STOP DEPTH
1413.5
1485.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
18-JUN-02
Insite 4.05.5
3.3
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............... ...0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point........ ..... .Undefined
Frame Spacing.............. ...... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units............... . . . . . . . .
Datum Specification Block sUb-type...O
Memory
1485.0
.0
26.0
TOOL NUMBER
015
13.500
Spud Mud
9.30
350.0
9.1
700
9.6
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
.0
61. 5
.0
.0
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 45 1485 765 2881 45 1485
ROP MWD010 FT/H 0.39 374.28 92.2224 2740 115.5 1485
GR MWD010 API 19.39 94.46 48.8119 2738 45 1413.5
First Reading For Entire File......... .45
Last Reading For Entire File.......... .1485
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
)
Date of Generation..... ..02/08/08
Maximum Physical Record..65535
File Type......... .... ...LO
Next File Name.... .... ...STSLIB.003
Physical EOF
File Header
Service name...... ....,. .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/08
Maximum Physical Record. .65535
File Type...... ....... ...LO
Previous File Name.... ...STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
)
header data for each bit run in separate files.
2
.5000
START DEPTH
1414.0
1485.5
STOP DEPTH
5528.5
5600.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
20-JUN-02
Insite 4.05.5
3.3
Memory
5600.0
27.9
71.3
TOOL NUMBER
011
13.500
5587.0
Spud Mud
9.80
240.0
8.6
500
6.0
.000
.000
.000
.000
.0
82.6
.0
.0
REMARKS:
$
)
#
Data Format Specification Record
Data Record Type......... .........0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units......... ..Feet
Data Reference Point............. .Undefined
Frame Spacing..... ............... .60 .1IN
Max frames per record.... ........ .Undefined
Absent value........... ...... .... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
Name Service Unit
DEPT FT
ROP MWD020 FT/H
GR MWD020 API
Min
1414
6.51
29.33
Max
5600
1079.34
128.62
Mean Nsam
3507 8373
222.913 8230
76.9918 8230
First Reading For Entire File... ...... .1414
Last Reading For Entire File........ ...5600
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation...... .02/08/08
Maximum Physical Record. .65535
File Type............... .LO
Next File Name........ ...STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/08
Maximum Physical Record. .65535
File Type...... ....... ...LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
4
First
Reading
1414
1485.5
1414
Last
Reading
5600
5600
5528.5
header data for each bit run in separate files.
3
.5000
#
LOG HEADER DATA
DATE LOGGED:
START DEPTH
5529.0
5567.0
5567.0
5567.0
5567.0
5567.0
5600.5
STOP DEPTH
8335.0
8327.0
8327.0
8327 . 0
8327 . 0
8327.0
8384.0
24-JUN-02
)
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.......... ...... ..0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record..... ..... ...Undefined
Absent value............. ..... ....-999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
Insite 4.05.5
66.37
Memory
8384.0
66.3
70.4
TOOL NUMBER
PB00220HWRG6
PB00220HWRG6
9.875
LSND
9.40
41. 0
10.3
500
5.8
.590
.381
1.850
2.000
67.0
107.6
67.0
67.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5529 8384 6956.5 5711 5529 8384
ROP MWD030 FT/H 2.54 1156.01 291. 636 5568 5600.5 8384
GR MWD030 API 7.48 124.83 62.9345 5613 5529 8335
RPX MWD030 OHMM 1. 61 127.95 7.36926 5521 5567 8327
RPS MWD030 OHMM
RPM MWD030 OHMM
RPD MWD030 OHMM
FET MWD030 HR
)
0.57
1. 61
1. 29
0.08
300.22
2000
2000
57.36
First Reading For Entire File......... .5529
Last Reading For Entire File. ...... .., .8384
File Trailer
Service name....... .... ..STSLIB.004
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation...... .02/08/08
Maximum Physical Record..65535
File Type.............. ..LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name. """'" ...STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/08/08
Maximum Physical Record..65535
File Type... ............ .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
DRHO
NPHI
FCNT
PEF
RHOB
NCNT
RPX
RPS
RPM
RPD
FET.
GR
ROP
$
5
7.64402 5521
10.5079 5521
13.8988 5521
1. 3665 5521
header data for each bit run in separate files.
4
.5000
START DEPTH
8300.0
8300.0
8300.0
8300.0
8300.0
8300.0
8327.5
8327.5
8327.5
8327.5
8327.5
8335.5
8384.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CNP
STOP DEPTH
10095.0
10095.0
10095.0
10095.0
10095.0
10095.0
10095.0
10095.0
10095.0
10095.0
10095.0
10095.0
10095.0
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
28-JUN-02
Insite 4.05.5
66.37
Memory
10095.0
29.8
70.3
TOOL NUMBER
PBOO157HRG6
PBOO157HRG6
PB00233NL6
5567
5567
5567
5567
8327
8327
8327
8327
)
SLD
$
STABILIZED LITHO DEN
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units. ........ ..Feet
Data Reference Point... .......... .Undefined
Frame Spacing. ................... .60 .1IN
Max frames per record............ .Undefined
Absent value............ ......... .-999
Depth Units.......................
Datum Specification Block sub-type...O
PB00233NL6
9.875
LSND
10.10
45.0
9.2
400
3.6
1. 250
.628
2.200
1.800
67.0
140.0
67.0
67.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HR 4 1 68 28 8
NPHI MWD040 PU-S 4 1 68 32 9
FCNT MWD040 CP30 4 1 68 36 10
NCNT MWD040 CP30 4 1 68 40 11
RHOB MWD040 G/CM 4 1 68 44 12
DRHO MWD040 G/CM 4 1 68 48 13
PEF MWD040 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8300 10095 9197.5 3591 8300 10095
ROP MWD040 FT/H 2.15 4382.62 243.233 3422 8384.5 10095
GR MWD040 API 18.45 117.82 60.8995 3520 8335.5 10095
RPX MWD040 OHMM 1.17 27.42 4.86786 3536 8327 . 5 10095
RPS MWD040 OHMM 1.16 31.76 5.05596 3536 8327.5 10095
RPM MWD040 OHMM 1.15 32.63 5.23329 3536 8327.5 10095
RPD MWD040 OHMM 1.19 34.47 5.64196 3536 8327.5 10095
FET MWD040 HR 0.13 22.16 1.23137 3536 8327.5 10095
NPHI MWD040 PU-S 19.8 52.29 31.4076 3591 8300 10095
FCNT MWD040 CP30 433.5 683 547.663 3591 8300 10095
NCNT MWD040 CP30 2224 3168 2717.82 3591 8300 10095
RHOB MWD040 G/CM 1. 79 3.17 2.27887 3591 8300 10095
DRHO MWD040 G/CM -0.1 0.77 0.0365024 3591 8300 10095
PEF MWD040 B/E
)
1.18
6.51
First Reading For Entire File......... .8300
Last Reading For Entire File.......... .10095
File Trailer
Service name........... ..STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation... ... .02/08/08
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .02/08/08
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name..... ..STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
PEF
ROP
RPX
RPS
RPM
RPD
NPHI
FCNT
NCNT
RHOB
DRHO
FET
$
6
2.01369 3591
header data for each bit run in separate files.
5
.5000
START DEPTH
10095.5
10095.5
10095.5
10095.5
10095.5
10095.5
10095.5
10095.5
10095.5
10095.5
10095.5
10095.5
10095.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CNP
SLD
$
#
STOP DEPTH
12591.0
12552.0
12640.0
12583.5
12583.5
12583.5
12583.5
12542.5
12542.5
12542.5
12552.0
12552.0
12583.5
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
STABILIZED LITHO DEN
05-JUL-02
Insite 4.05.5
66.37
Memory
12640.0
12.9
68.3
TOOL NUMBER
PB00259HRG6
PB00259HRG6
PB00233NL6
PB00233NL6
)
8300
10095
)
)
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
9.875
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
10.10
45.0
9.4
250
4.0
3.900
2.140
4.600
4.100
65.0
124.0
65.0
65.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............ ......0
Data Specification Block Type... ..0
Logging Direction..... ..... ..... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing................ .... .60 .1IN
Max frames per record....... ..... .Undefined
Absent value. .............. ...... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HR 4 1 68 28 8
NPHI MWD050 PU-S 4 1 68 32 9
FCNT MWD050 CP30 4 1 68 36 10
NCNT MWD050 CP30 4 1 68 40 11
RHOB MWD050 G/CM 4 1 68 44 12
DRHO MWD050 G/CM 4 1 68 48 13
PEF MWD050 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10095.5 12640 11367.8 5090 10095.5 12640
ROP MWD050 FT/H 0.05 541.54 156.999 5090 10095.5 12640
GR MWD050 API 41.44 338.18 100.246 4992 10095.5 12591
RPX MWD050 OHMM 0.69 104.25 4.34404 4977 10095.5 12583.5
RPS MWD050 OHMM 0.66 101.68 4.35454 4977 10095.5 12583.5
RPM MWD050 OHMM 0.61 93.91 4.37162 4977 10095.5 12583.5
RPD MWD050 OHMM 0.66 133.03 4.70137 4977 10095.5 12583.5
FET MWD050 HR 0.17 3.48 0.784517 4977 10095.5 12583.5
NPHI MWD050 PU-S 15.24 61.89 37.8942 4895 10095.5 12542.5
FCNT MWD050 CP30 434.92 923 555.913 4895 10095.5 12542.5
NCNT MWD050 CP30 2232 3180.48 2594.01 4895 10095.5 12542.5
RHOB MWD050 G/CM 1.291 3.062 2.29501 4914 10095.5 12552
DRHO MWD050 G/CM -0.171 0.453 0.077408 4914 10095.5 12552
PEF MWD050 B/E 1. 93 11.18 5.14746 4914 10095.5 12552
)
')
First Reading For Entire File........ ..10095.5
Last Reading For Entire File.... """ .12640
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.. ..... ... .1.0.0
Date of Generation.. .... .02/08/08
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name.......... .STSLIB.007
Physical EOF
Tape Trailer
Service name.. """"" .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/08
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number.... ..01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS
Writing Library.
Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/08
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name........ ....... . UNKNOWN
Continuation Number. .... .01
Next Reel Name.......... . UNKNOWN
Comments............... ..STS LIS
Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File