Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-138
f
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
<QO:l. - L3~ Well History File Identifier
Organizing (done)
D Two-sided 1111111111111111111
~scan Needed 1111111111111111111
REJCAN
\ç.f Color Items:
0 Greyscale Items:
DIGITAL DATA
~skettes, No.~
0 Other, No/Type:
OVERSIZED (Scannable)
0 Maps:
0 Other Items Scannable by
a Large Scanner
0 Poor Quality Originals:
OVERSIZED (Non-Scannable)
0 Other:
0 Logs of various kinds:
Scanning Preparation
I
x 30 = 36
D Other:: f ~J
Date 1 ;)-71 OLf 151 vufJ
I ,1111111111111111111.
Date:~. ~ ()Lf 151 vnP
+ ?..il = TOTAL PAGES 50/
~~~~q~~.i~~I~f~;I;~P
NOTES:
BY:
Helen ~
Project Proofing
BY:
Helen ~.
BY:
Helen ~~.
Production Scanning
Stage 1
Page Count from Scanned File: bo (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: / YES
Helen ~ Date q 3Ó/Dlf
YES NO
NO
Is! ntP
Stage 1
BY:
If NO in stage 1 page(s) discrepancies were found:
BY:
Helen Maria
Date: Isl
II-Till
1IIIlIIIIIIIII
Date: Isl
Quality Checked 1111111111111111111
BY:
Helen Maria
Scanning is complete at this point unless rescanning is required.
ReScanned
Comments about this file:
8/24/2004 Well History File Cover Page.doc
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiclte\CvrPgs _ Inserts\Microfilm _ Marlœr.doc
J / .~ ~Q-~V\
DATA SUBMITTAL COMPLIANCE REPORT
8/2/2004
Jp~¿ ;(. / ~{J~ l-Nì-
API No. 50-029-23100-60-00
Permit to Drill 2021380
Well Name/No. MILNE PT UNIT SB S-05L 1
Operator BP EXPLORATION (ALASKA) INC
MD 8745
."..-
TVD 4037 -- Completion Date 7/27/2002 ....-
Completion Status 1-01L
Current Status 1-01L
UIC N
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, ABI/lFR, CASANDRA
Well Log Information:
Log/
Data Digital
~ Med/Frmt
~
~
~D D
Rpt
~D
(data taken from Logs Portion of Master Well Data Maint)
Electr
Dataset
Number
Log Log Run Interval OH/
Scale Media No Start Stop CH Received Comments
1 5038 8745 Open 8/23/2002
1 5038 8745 Open 8/23/2002 MWD
1 60 8691 Case 12/3/2002
1 60 8691 Case 12/3/2002
1 5038 8745 Open 8/23/2002
5038 8745 Open 8/23/2002 MWD
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 7/1/2002.
Name
Directional Survey
Directional Survey
LIS Verification
...( 335 LIS Verification
Directional Survey
Directional Survey
-ED C Asc ~1967 LIS Verification 1,2,3,6, 60 8745 Open 6/2/2003
~D C Pdf ,.,/"11967 Induction/Resistivity 25 Final 110 8745 Open 6/2/2003 MWD - Rap, DGR, EWR -
MD
ED C Pdf 11967 Induction/Resistivity 25 Final 110 4037 Open 6/2/2003 MWD - DGR, EWR - TVD
.-'
Well Cores/Samples Information:
Sample
Interval Set
Name Start Stop Sent Received Number Comments
DATA SUBMITTAL COMPLIANCE REPORT
8/2/2004
Permit to Drill 2021380
Well Name/No. MILNE PT UNIT SB S-05L 1
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23100-60-00
MD 8745
TVD 4037
Completion Date 7/27/2002
Completion Status 1-01L
Current Status 1-01L
UIC N
Well Cored?
ADDITIONAL INFORMATION
v(@
Daily History Received?
(!yN
G/N
Chips Received? ~
Formation Tops
Analysis
Received?
~
Comments:
Compliance Reviewed By:
'L
Date:
2g J'1:t ~ Ý
(
(
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
April 22, 2003
RE: MWD Formation Evaluation Logs: MPS-05, MPS-05 PBI & Ll,
AK-MW-22118
MPS-05:
Digital Log Images:
50-029-23100-00
d-o~-\3l
1 CD Rom
~)\1LoLP
MPS-05 PBl:
Digital Log Images:
50-029-23100-70
-~~~,~<S
1 CD Rom
MPS-05 Ll:
Digital Log Images:
50-029-23100-60
~d,-l~'ß
1 CD Rom .t:l '\ '=\ (g 1-
~~~ tY"- ~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
RECEIVED
D~N 02 2003
Signed~c:b,~~ ~,-c, ~
Alaaka OK & Gu Cons. Commieeim
Ml\Cn4Q;
eX D;)-/3%
f 1335
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
33 3 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 27, 2002
RE: MWD Formation Evaluation Logs MPS-05 L1,
AK-MW-22118
1 LIS formatted Disc with verification listing.
API#: 50-029-23100-60
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
Si~6.ßOO(ìJ
RECEIVED
DEC 03 2002
AJaska °'1 &. Gas Cons. Cornroission
Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised 10/03/02, Start Production
""
('
1. Status of Well
aD Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface ; . ..,: ;~'-~~:'t.,:~,
3360' NSL, 4772' WEL, SEC. 07, T12N, R11E, UM ~ .'''':..::J,Oh~ ~
At top of productive interval: , .' . ~
3927' NSL, 3230' WEL, SEC. 07, T12N, R11E, UM (OA); -~2-~-:?~
At total depth ; ¡:_.;;);,~!J ~
647' NSL, 4591' WEL, SEC. 07, T12N, R11E, UM (OA) f.._L~2.--...1
)I...oIII:I:,-,...,-~",...,~¡,o:J¡.
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 66.8' ADL 380110
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
7/21/2002 7/24/2002 7/27/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
8745 4037 FT 8745 4037 FT 0 Yes aD No
22. Type Electric or Other Logs Run
MWD , GR , RES, ABI/IFR I CASANDRA
23.
CASING
SIZE
20"
7-5/8"
4-1/2"
WT. PER FT.
94#
29.7#
12.6#
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
28' 112' 42"
28' 5111' 9-7/8"
5089' 8332' 6-1/8"
CEMENTING RECORD
260 sx Arctic Set (Approx.)
1060 sx PF 'L', 280 sx Class 'G'
Uncemented Slotted Liner
TUBING RECORD
SIZE DEPTH SET (MD)
4-1/2", 12.6#, L-80 5022'
3-1/2",9.2#, L-80 5022' - 5070'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 35 Bbls of Diesel and
45 Bbls of MeOH.
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28. CORE DATA 1}1! -~I'I.t:n
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or wat1\ e~i!feyr¡;V
GRADE
H-40
L-80
L-80
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
25.
MD
MD
TVD
TVD
5136' - 8292'
4120' - 4103'
26.
27.
Date First Production
September 8, 2002
Date of Test Hours Tested
9/22/2002 12
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-BBL
TEST PERIOD 1908
OIL -BBL
WATER-BBL
GAs-McF
710
GAs-McF
WATER-BBL
2822
No core samples were taken.
RBDMS 9Fl
Form 10-407 Rev. 07-01-80
(
Classification of Service Well
7. Permit Number
202-138
8. API Number
50- 029-231 00-60
9. Unit or Lease Name
Milne Point Unit
10. Well Number
MPS-05L 1
11. Field and Pool
Milne Point Unit 1 Schrader Bluff
15. Water depth, if offshore 16. No. of Completions
N/A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
NI A MD 1800' (Approx.)
AMOUNT PULLED
PACKER SET (MD)
5017'
CHOKE SIZE
176 I 64ths
OIL GRAVITY-API (CORR)
GAS-OIL RATIO
372
OCT 9 2002 OCT 0 4 2002
Alaska Oi~&Gas QoOS. commIsSIon
Anchorage
Submit In Duplicate
.,
,-
(
(
''<ò;.
29. Geologic Markers
Marker Name Measured
Depth
SBF2-NA 4810'
SBF1-NB 4855'
SBE4-NC 4907'
SBE2-NE 4928'
SBE1-NF 50331
TSBD-OA 5106'
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
3957'
3985'
40151
4028'
4080'
4410'
RE€EIVED
OCT 0 4 2002
AlasKa 01& Gas Gons. Commission
Anchorage
31. List of Attachments:
32. I hereby certify that the fore oing is true and correct to the best of my knowledge
Signed .,.-~: Title Technical Assistant
~W~-
Date
lD-03-D'~
MPS-05L 1
Well Number
202-138
Permit No. I Approval No.
Prepared By Name/Number: Sondra Stewman, 564-4750
Drilling Engineer: Matt Green, 564-5581
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
('
(
1. Status of Well
Œa Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator i 7. Permit Number
BP Exploration (Alaska) Inc. 202-138
3. Address 8. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-23100-60
4. Locati~n of well a~ surface ¡ ".- i ~~~'~~~~':"v. 9. Un,it or L~ase N.ame
3360 NSL,4772 WEL, SEC. 07, T12N, R11E, UM 4 L,'idE % ~,~,..t{.,f'Ht(.~<,J¡¡ Milne POint Umt
At top of productive interval * 7: 27P7_~, t \i'~J1Wi~~.. /
3927' NSL, 3230' WEL, S. EC. 07, T12N, R11 E, UM (OA) J ... \JERÆ1!.' 18ì.....~. i. :$.. U.I1...61..1>J1... 10. Well Number
At ,total depth, J.... Al?49 "'; -; W WT"' .. ,. MPS-05L 1
647 NSL,4591 WEL, SEC. 07, T12N, R11 E, UM (OA) 'h... n'"'l_TÙ~."",~ ;... .._-~ .. ,
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial'N~--"~~'.'-" 11. F~\~ea~~i~f~nit I Schrader Bluff
KBE = 66.8' ADL 380110
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
7 /2'/~~02 7/24/2002 7/27/2002
17. Total Depth (MD+ TVD) 18. Plug Back Depth (MD+ TV D) 19. Directional Survey
8745 4037 FT 8745 4037 FT Œa Yes 0 No
22. Type Electric or Other Logs Run
MWD , GR , RES, ABI/IFR I CASANDRA
23.
CASING
SIZE
20"
7-5/8"
4-1/2"
Classification of Service Well
15. Water depth, if offshore 16. No. of Completions
N/ A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1800' (Approx.)
GRADE
H-40
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
28' 112' 42"
28' 5111' 9-7/8"
5089' 8332' 6-1/8"
-r/tùJhJc~ 51/1 ~I>
. YIII.~'7VÒ
WT. PER FT.
94#
29.7#
12.6#
CEMENTING RECORD
260 sx Arctic Set (Approx.)
1060 sx PF 'L', 280 sx Class 'G'
Uncemented Slotted Liner
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
MD
TVD
MD
TVD
SIZE
4-1/2", 12.6#, L-80
3-1/2",9.2#, L-80
TUBING RECORD
DEPTH SET (MD)
5022'
5022' - 5070'
PACKER SET (MD)
5017'
25.
5136' - 8292'
4120' - 4103'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27.
Date First Production
Not on Production
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
N/A
PRODUCTION FOR OIL-BBL
TEST PERIOD
GAs-McF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
OIL-BBL
GAs-McF
WATER-BBL
OIL GRAVITY-API (CORR)
28.
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water., .$qþrt1it~orr çhip;~:
No core samples were taken.
RBDMS 8Fl
~~
Form 10-407 Rev. 07-01-80
SEP 2 3 2002
Submit In Duplicate
(
29. Geologic Markers
Marker Name Measured
Depth
SBF2-NA 4810'
SBF1-NB 4855'
SBE4-NC 4907'
SBE2-NE 4928'
SBE1-NF 5033'
TSBD-OA 5106'
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
3957'
3985'
4015'
4028'
4080'
4410'
31. List of Attachments:
SUrJIrJIary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary
32. I hereby certify that the fore oing is true and correct to the best of my knowledge
¡
Signed
Title Technical Assistant
Date 1$-;)7 -ò'2...
M PS-05L 1
Well Number
202-138
Permit No. / Approval No.
Prepared By Name/Number: Sondra Stewman, 564-4750
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Legal Name: MPS-05
Common Name: MPS-05
Test Date
7/18/2002
Test Type
FIT
Test Depth (TMD)
5,410.0 (ft)
BP
leak..Off Test Summary
TestDepth{TVD)
4,180.0 (ft)
AMW
9.00 (ppg)
Surface Pressure
450 (psi)
Leak Off Pressure (BHP)
2,404 (psi)
Page 1 of 1
EMW
11.07 (ppg)
~
~,
Printed: 7/29/2002 4:40:55 PM
(
BP
Operations Summary Report
Page 1 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-05
MPS-05
DRILL +COMPLETE
DOYON
DOYON 141
Start: 7/11/2002
Rig Release: 7/27/2002
Rig Number: 141
Spud Date: 7/11/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/11/2002 00:00 - 03:30 3.50 MOB P PRE MOVE SUB - UTILITY MODULES - PIPE SHEDS -
ROCKWASHER - FROM MPS-23 TO MPS -05
03:30 - 04:00 0.50 MOB P PRE RIG UP ALL UTILITY SERVICES - PREFORM RIG
ACCEPTANCE LIST - (ACCEPT RIG AT 04:00 HRS)
04:00 - 08:00 4.00 RIGU P PRE NIPPLE UP DIVETER RISER TO FLOW LINE - LOAD PIPE
SHED WITH 4" DRILL PIPE - MIX SPUD MUD
08:00 - 17:30 9.50 DRILL P INT1 PICK UP 93 STANDS OF 4" DRILL PIPE - STANDING IN
DERRICK - PU 5" HWDP - 6" FLEX DC'S - JARS STANDING
IN DERRICK
17:30 - 20:00 2.50 DRILL P INT1 PICK UP BHA - MAKE UP BIT - MOTOR - MWD - UP LOAD
MWD
20:00 - 20:30 0.50 DRILL P INT1 PRE SPUD MEETING WITH CREW, MUD ENGINEER,
DIRECTIONAL DRILLER, MWD PERSONNEL, - FUNCTION
TEST DIVERTER - ACCUMULATOR DRILL - (WITNESS OF
FUNCTION TEST OF DIVERTER SYSTEM WAIVED BY
JOHN CRISP WITH AOGCC) - FILL HOLE, RISER, AND
FLOW LINE - SURFACE TEST OF MUD SYSTEM - OK
20:30 - 00:00 3.50 DRILL P INT1 SPUD IN WELL MPS-05 - DRILL FROM 110' TO 259' - WOB 0
TO 5K - RPM 60 - TO 0 - GPM 393 - PP 1020 - PU 50 - SO 50
- ROT 50
7/12/2002 00:00 - 17:30 17.50 DRILL P INT1 DIRECTIONAL DRILL FROM 259' TO 2462' - WOB 30K TO
35K - RPM 80 - TO 5k ON BTM - 3K OFF BTM - GPM 425 -
PP ON BTM 2140 - OFF BTM 1740 - PU 80 - SO 65 - ROT 75
17:30 - 18:30 1.00 DRILL P INT1 CIRC 3 X BTM UP - GPM 425 - PP 1750 - RPM 90 - TQ 3K
18:30 - 21 :00 2.50 DRILL P INT1 PUMP OUT FROM 2462' TO HWDP 811' - FULL RATE 400
GPM - CON'T POH TO MWD
21 :00 - 22:30 1.50 DRILL P INT1 DOWN LOAD MWD - LAY DOWN BHA - MOTOR
22:30 - 00:00 1.50 DRILL P INT1 PICK UP GEO-PILOT - MWD - UP LOAD MWD - PU BHA
7/13/2002 00:00 - 00:30 0.50 DRILL P INT1 CON'T PICK UP GEO-PILOT BHA
00:30 - 01 :00 0.50 DRILL P INT1 TEST SPERRY SUN GEO-PILOT MANIFOLD TO 3000 PSI -
TEST MWD
01 :00 - 02:00 1.00 DRILL P INT1 RIH FROM 811' TO 2410' - TIGHT FROM 2190' TO 2210'
(20k) - WORK THROUGH SECTION WITHOUT PUMP OR
ROTATION
02:00 - 03:00 1.00 DRILL P INT1 NO DOWN LINK COMMUNICATION TO SPERRY SUN MWD
TOOL - TROUBLE SHOOT SPERRY SUN GEO-PILOT
SYSTEM - FOUND ERROR IN UP LOAD - CONSISTED OF
ENGINEER FAILED TO ENABLE UP LINK TELEMENTRY
03:00 - 04:00 1.00 DRILL P INT1 DIRECTIONAL DRILL FROM 2462' TO 2594' - CAN NOT
KEEP CONSISTENCE TOOL FACE DUE TO HOUSING ROLL
04:00 - 04:30 0.50 DRILL N DPRB INT1 CIRC FOR TRIP 2 X BOTTOMS UP
04:30 - 06:30 2.00 DRILL N DPRB INT1 OBSERVE WELL - PUMP OUT TO HWDP - CON'T POH TO
MWD
06:30 - 08:30 2.00 DRILL N DPRB INT1 DOWNLOAD MWD - LAY DOWN GEO-PILOT BHA
08:30 - 09:30 1.00 DRILL N DPRB INT1 PICK UP 1.5 DEGREE MOTOR - BHA - UP LOAD MWD
09:30 - 11 :00 1.50 DRILL N DPRB INT1 RIH TO 2490' - PRECAUCTIONARY WASH TO 2594' -
(TIGHT 20K DOWN FROM 1720' TO 1750' WORK THROUGH
WITHOUT PUMP)
11 :00 - 21 :30 10.50 DRILL P INT1 DIRECTIONAL DRILL FROM 2594' TO 4055' - WOB 10K TO
20K - RPM 80 - GPM 504 - PP ON BTM 3060 - PP OFF BTM
2850 - TO ON BTM 6K OFF BTM 5K - PU 110K - SO 77K-
Printed: 7/29/2002 4:41:08 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
(
BP
Operations Summary Report
MPS-05
MPS-05
DRILL +COMPLETE
DOYON
DOYON 141
Start: 7/11/2002
Rig Release: 7/27/2002
Rig Number: 141
Page 2 of 7
Spud Date: 7/11/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/13/2002 11:00 - 21:30 10.50 DRILL P INT1 ROT 95K
21 :30 - 23:00 1.50 DRILL P INT1 CIRC 3 X BTMS UP
23:00 - 00:00 1.00 DRILL P INT1 PRECAUCTIONARY SHORT TRIP - PUMP OUT TO 2900'
7/14/2002 00:00 - 01 :00 1.00 DRILL P INT1 PUMP OUT FROM 2900' TO 2055' - CON'T TP POH TO
HWDP 811' - NO TIGHT SPOTS NOTED ON TRIP OUT
01 :00 - 01 :30 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE - OBSERVE WELL
01 :30 - 03:00 1.50 DRILL P INT1 RIH FROM 811' TO 4000' - (TIGHT SPOTS ON TRIP IN 1715'
TO 1727' 15K - 1745' TO 1760' 20K WORK THROUGH WITH
OUT PUMP) - WASH FROM 4000' TO 4055'
03:00 - 18:30 15.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4055' TO 5528' - T.D. @ 5528'-
WOB 30K TO 35K - RPM 80 - TQ 8K ON BTM 7K OFF BTM -
GPM 500 - PP ON BTM 33500 - PP OFF BTM 3200 - PU 120K
- SO 76K - ROT 94K
18:30 - 20:30 2.00 CASE P INT1 CBU 3 X BTMS FOR HOLE OPENER TRIP - GPM 500 -140
RPM'S - TO 7K
20:30 - 22:00 1.50 CASE P INT1 PUMP OUT FROM 5250' TO TO 3988' - PULL FROM 3988'
TO 3708'
22:00 - 00:00 2.00 CASE P INT1 PUMP DRY JOB - OBSERVE WELL - POH
7/15/2002 00:00 - 01 :00 1.00 CASE P INT1 CON'T POH TO MWD
01 :00 - 01 :30 0.50 CASE P INT1 DOWN LOAD MWD
01 :30 - 02:00 0.50 CASE P INT1 LAY DOWN BHA # 3
02:00 - 02:30 0.50 CASE P INT1 MAKE UP HOLE OPENING BHA # 4
02:30 - 03:30 1.00 CASE P INT1 RIG SERVICE - CUT DRLG LINE
03:30 - 04:00 0.50 CASE P INT1 RIH FROM 204' TO 1550'
04:00 - 10:00 6.00 CASE P INT1 OPENING HOLE FROM 1550' TO 5187' - COULD NOT PASS
5187' - RPM 150 - TO 8K - GPM 500 - PP 2200 - PU 130K-
SO 80K ROT 95K -
10:00 - 11 :00 1.00 CASE N DPRB INT1 ATTEMPT TO PASS 5187' - COULD NOT GET PASSED 5187
- RUN UP TO 40K ON OPENER - NO PROGRESS -
11 :00 - 14:00 3.00 CASE N DPRB INT1 OBSERVE WELL - PUMP DRY JOB - POH WITH HOLE
OPENER FOR INSPECTION - BULL NOSE WORN -
EVERYTHING ELSE IN GOOD SHAPE ON HOLE OPENER
AND BHA#4
14:00 -15:30 1.50 CASE N DPRB INT1 PICK UP NEW HOLE OPENER - MOVE TOP STAB UP HOLE
30' - STABLlZERS AT 74' /140' - PICK UP 5" HWDP ON TOP
OF HOLE OPENER TO LIMBER UP ASSEMBLY - BHA # 5
15:30 - 18:00 2.50 CASE N DPRB INT1 RIH WITH 2 NO HOLE OPENER TO 5164' - BREAK CIRC
18:00 - 19:00 1.00 CASE N DPRB INT1 ATTEMPT TO REAM PASS 5187' - NO PROGRESS - RUN
UP TO 43K ON HOLE OPENER - GPM 500 - PP 2400 - RPM
50 TO 150 - TO 8K TO 10K - PU 130K - SO 80 K ROT 95K
19:00 - 22:00 3.00 CASE N DPRB INT1 OBSERVE WELL - PUMP DRY JOB - POH FOR BHA # 6 -
HOLE OPENER HAD CUTS / GOUGES ON BOTTOM 6" OF
SNUB NOSE - NOSE WAS PLUGGED - BOTTOM OF NOSE
HAND CRACKS GOING OUT FROM JET HOUSING TO
OUTTER EDGE OF NOSE - LAY DOWN HOLE OPENER
BHA # 5
22:00 - 23:00 1.00 CASE N DPRB INT1 PICK UP BHA # 6
23:00 - 00:00 1.00 CASE N DPRB INT1 RIH WITH (DRLG ASSEMBLY) BHA # 6 TO 1520' -
SHALLOW TEST MWD
7/16/2002 00:00 - 01 :30 1.50 CASE N DPRB INT1 RIH WITH (DRLG ASSEMBLY) - BHA # 65164 - BREAK
CIRC - CON'T IN TO 5187' TAG UP
01 :30 - 04:30 3.00 CASE N DPRB INT1 ORIENT TOOL FACE TO LOW SIDE - SLIDE 15' - ROLL
TOOL FACE TO HIGH SIDE - SLIDE 20' - ROTATE AHEAD-
Printed: 7/29/2002 4:41:08 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
BP
Operations Summary Report
Page 3 of 7
MPS-05
MPS-05
DRILL +COMPLETE
DOYON
DOYON 141
Start: 7/11/2002
Rig Release: 7/27/2002
Rig Number: 141
Spud Date: 7/11/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/16/2002 01 :30 - 04:30 3.00 CASE N DPRB INT1 CON'T DIRECTIONAL DRilLING TO T.D. @ 5380' - 30'
MEASURED DEPTH INTO OB SAND - ANGLE ON BOTTOM
PROJECTED AT 82 DEGREE'S
04:30 - 05:00 0.50 CASE N DPRB INT1 CIRCULATE HOLE
05:00 - 05:30 0.50 CASE N DPRB INT1 SHORT TRIP TO 5100' - RIH WITHOUT PUMPS - NO
PROBLEMS
05:30 - 06:00 0.50 CASE N DPRB INT1 CIRCULATE I CONDITION HOLE
06:00 - 09:30 3.50 CASE N DPRB INT1 OBSERVE WEll - PUMP DRY JOB - POH FOR HOLE
OPENER - LAY DOWN BHA # 6
09:30 - 12:00 2.50 CASE N DPRB INT1 MAKE UP HOLE OPENER ASSEMBLY BHA # 7 - RIH TO
5137'
12:00 - 14:00 2.00 CASE N RREP INT1 TROUBLE SHOOT TOP DRIVE - FAilURE ON ENCODER
TEMP BY PASS
14:00 - 14:30 0.50 CASE P INT1 WASH AND REAM FROM 5137' TO BOTTOM 5187'
14:30 - 16:00 1.50 CASE P INT1 CIRCULATE AND CONIDITION MUD I HOLE FOR RUNNING
7 5/8" CASING - 3 X BOTTOMS UP - GPM 550 - PP 2500 -
RPM 150 - TQ 7K
16:00 - 18:30 2.50 CASE P INT1 OBSERVE WEll - PUMP DRY JOB - POH TO BHA
18:30 - 19:00 0.50 CASE P INT1 LAY DOWN 5" HWDP
19:00 - 20:00 1.00 CASE P INT1 LAY DOWN BHA # 7 - CLEAR FLOOR
20:00 - 21 :30 1.50 CASE P INT1 RIU CSG. CREW -PJSM - (RUNNING CASING)
21 :30 - 00:00 2.50 CASE P INT1 PICK UP AND RUN 7 5/8" 29# l-80 CASING - 66 JTS. IN
HOLE 85K PIU WT 63 SIO
7/17/2002 00:00 - 03:00 3.00 CASE P INT1 RUN 7 5/8" 29# l-80 CASING FROM 2700' TO 5370' - (TOTAL
JOINTS RUN 128 JTS) - LANDED CSG. ON LANDING RING
250 PIU - 85 SIO
03:00 - 06:00 3.00 CASE P INT1 CIRCULATE I CONDITION HOLE AND MUD FOR CEMENT
JOB - CIRC 1 CSG. VOLUME (3100 STKS) 324 GPM @ 400
PSI- LAY DOWN FRANKS Fill TOOL -INSTALL HOWCO
CEMENTING HEAD - CON'T CIRC I COND MUD FOR
CEMENT JOB - PJSM FOR CEMENTING - AIR UP HOWCO
TANKS PREPARE TO CEMENT
06:00 - 10:30 4.50 CASE P INT1 PUMP 10 BBlS WATER - TEST LINES TO 3500 PSI- DROP
BOTTOM PLUG - PUMP 40 BBlS WATER - MIX AND PUMP
50 BBlS ALPHA WEIGHTED SPACER 10.2 - MIX AND PUMP
990 BBlS 10.7 lEAD CEMENT - CEMENT TO SURFACE
(160) -100 BBlS OF 10.3 TO 10.4 CONTAINMENTED
CEMENT - 60 BBlS OF GOOD 10.7 CEMENT - GOOD
RETURNS - SWITCHED TO TAil - MIX AND PUMP 43 BBlS
OF TAil 15.8 - SURGE TANK RELEASE VALVE CUT OUT
RELEASING All AIR ON SURGE TANK - WHICH WOULD
NOT AllOW CEMENT TO TRANSFER TO MIX TANK -
OPERATION SHUT DOWN FOR 15 MINS - TRANSFERED
CEMENT MANUAllY TO MIX TANK - CONTINUE MIX AND
PUMP 15.8 TAil CEMENT 19 BBlS - DID NOT REGAIN
RETURNS
10:30 - 11 :00 0.50 CASE P INT1 DROP TOP PLUG - DISPLACE WITH 30 BBlS WATER - 243
BBlS MUD - NO RETURNS - PUMPED TOTAL 262 BBlS
WITHOUT RETURNS (19 BBlS TAil + 243 BBlS MUD)-
BUMPED PLUG WITH 2100 PSI (1000 PSI OVER PUMP
PRESSURE DISPLACING) - BLEED OFF FLOATS - FLOATS
HELD - CIP 11 :00 HRS
Printed: 7/29/2002 4:41:08 PM
BP
Operations Summary Report
Page 4 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
M PS-05
MPS-05
DRILL +COMPLETE
DOYON
DOYON 141
Start: 7/11/2002
Rig Release: 7/27/2002
Rig Number: 141
Spud Date: 7/11/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/17/2002 11 :00 - 12:00 1.00 CASE P INT1 FLUSH DIVERTER SYSTEM - RIG DOWN HOWCO CEMENT
HEAD
12:00 - 13:00 1.00 CASE P INT1 UD LANDING JOINT - CASG TOOLS - CHANGE OUT BALES
- CLEAR FLOOR
13:00 - 16:00 3.00 CASE P INT1 NIPPLE DOWN DIVERTER SYSTEM
16:00 - 16:30 0.50 CASE P INT1 ORIENT AND NIPPLE UP FMC GEN 6 CASG HEAD - TEST
TO 1000 PSI FOR 10 MINS OK
16:30 - 19:30 3.00 CASE P INT1 NIPPLE UP 13 5/8" BOP'S
19:30 - 00:00 4.50 CASE P INT1 TEST BOPE (WITNESS WAIVED BY J. SPAULDING --WITH
AOGCC ) UPPER & LOWER RAMS --CHOKE
MANIF.HCR.-KILL LINE -CHOKE VAVLES TO 250 PSI LOW,
F I 5 MIN.- 4000 PSI HIGH, F I 5 MIN. ANNULAR 250 PSI &
2500 PSI, F /5 MIN. EACH - FULL ACCUMULATOR TEST--5
BOTTLE AVE. 2150 PSI-ACC. 3000 PSI--5 FUNCTION,
DEPLETION 1850 PSI--200 PSI ELEC. RECOVERY 37
SEC.-O.A. RECOVERY 3 MIN. 16 SEC.
7/18/2002 00:00 - 07:00 I 7.00 CASE N RREP INT1 TROUBLE SHOOT TOP DRIVE - CHANGE OUT BRAKE
PADS - ENCODER - CONT. TROUBLE SHOOT TOP DRIVE -
I FOUND SHORT IN LINE CAUSING ENCODER TO BURN
OUT - REPAIRED SHORT AND REPLACED ENCODER
07:00 - 08:00 1.00 CASE P INT1 FINISH TESTING BOPE - BLIND RAMS, UPPER & LOWER
TOP DRIVE INSIDE BOPS-TEST TO 250 PSI LOW -4000 PSI
HIGH FOR 5 MIN.
08:00 - 08:30 0.50 CASE P INT1 INSTALL WEAR RING
08:30 - 12:00 3.50 CASE N RREP INT1 CONT. TO TROUBLE SHOOT TOP DRIVE-FOUND
INTERMITEN OPEN THAT WAS BURNING OUT DECODERS
12:00 - 18:30 6.50 CASE N RREP INT1 REPAIR TOP DRIVE & TEST SAME-OK
18:30 - 19:30 1.00 CASE P INT1 CHANGE OUT WORN SAVER SUB
19:30 - 21 :30 2.00 CASE P INT1 PICK UP BHA #8- MAKE UP BIT-MOTOR-MWD-UP LOAD
MWD
21 :30 - 23:30 2.00 CASE P INT1 RUN IN HOLE -PERFORMED SHALLOW TEST ON MWD
23:30 - 00:00 0.50 CASE P INT1 BREAK CIRC. -TEST CSG. TO 4000 PSI ( 37 STK.) FOR 30
MIN.& RECORD SAME @5203 FT.
7/19/2002 00:00 - 00:30 0.50 CASE P INT1 CON'T RECORD & TEST CSG - TO 4000 PSI FOR 30 MIN @
5203 FT.
00:30 - 03:00 2.50 CASE P INT1 DRLG - CEMENT - FLOAT COLLAR - SHOE - SLIDE 30 FT
NEW HOLE TO 5410 FT
03:00 - 04:00 1.00 CASE P INT1 CIRC I COND - MUD FOR FIT
04:00 - 04:30 0.50 CASE P INT1 PERFORM FIT - PRESS UP TO 520 PSI WITH 9 # MUD -
PRESS BELD BACK TO 450 PSI IN 10 MIN (EMW = 11.06#
MUD)
04:30 - 08:00 3.50 CASE P INT1 MAD PASS FROM 5045 FT. TO 5410 FT.
08:00 - 09:00 1.00 CASE P INT1 DISPLACE WELL BORE WITH 9.1# FLOPRO MUD
09:00 - 00:00 15.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 5410 FT. TO 6850 FT. ( CROSS
FAULT @ 6797 FT. )RPM 60-70 -P/U WT.115K -S/O 73
K-RW 83 K---TO ON BOT 6 K- OFF BOT 5.5 K
7/20/2002 00:00 - 21 :30 21.50 DRILL P PROD1 DIRECTIONAL DRILL FROM 6850 FT. TO 8810 FT.TD. FOR
OB LATERAL (BACK IN SAND @ 7020 FT. AFTER
CROSSING FAULT @ 6797 FT.)
RPM 60-70 - P I U WT. 120 K--S/O 73K-ROT 85K-TO ON
BOT. 6K --OFF BOT.5K
21 :30 - 00:00 2.50 CASE P COMP CIRC. & CONDo HOLE @8810 FT. (TO) PREPARE TO RUN
41/2" SLOTED LlNER-CIRC 4 BOT UP @80 STKS(280 GPM)
Printed: 7/29/2002 4:41 :08 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
(
(
BP
Operations Summary Report
Page 5 of 7
M PS-05
MPS-05
DRILL +COMPLETE
DOYON
DOYON 141
Start: 7/11/2002
Rig Release: 7/27/2002
Rig Number: 141
Spud Date: 7/11/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/20/2002 21 :30 - 00:00 2.50 CASE P COMP ROT @ 100 RPM WHILE CIRC.
7/21/2002 00:00 - 00:30 0.50 CASE P COMP FINISH CIRC.HOLE CLEAN BEFORE POOH FOR
41/2" SLOTED LINER
00:30 - 06:00 5.50 CASE P COMP PUMP OUT OF HOLE FROM 8810 FT.( TO )BACK TO SHOE
@ 5370 FT.I OBSERVE WELL-PUMP DRY JOB CONT.POH
06:00 - 07:00 1.00 CASE P COMP DOWN LOAD MWD
07:00 - 07:30 0.50 CASE P COMP LAY DOWN BHA
07:30 - 08:00 0.50 CASE P COMP RU CASG TOOLS TO RUN 4.5" SLOTTED LINER - PJSM ON
RUNNING LINER
08:00 - 10:30 2.50 CASE P COMP PU I RUN 90 JTS 4 1/2" SLOTTED LINER - 2 JTS 4 1/2"
SOLID LINER - PU BAKER HANGER AND MAKE UP SAME
10:30 - 13:00 2.50 CASE P COMP CON'T RIH WITH 4.5" SLOTTED LINER ON 4" DRILL PIPE
TO 8810'-P/U WT. 115 K-S/O 65 K
13:00 - 14:00 1.00 CASE P COMP DROP BALL - BALL ON SEAT PRESSURE UP TO 2500 SET
HANGER - SLACK OFF 35K DP WEIGHT - PRESSURE UP
TO 3100 SHEAR OUT - HANGER SET - TOL 5265' - BTM
LINER 8807' - LOSS OF 30K WEIGHT WHEN PICKED UP
14:00 - 16:00 2.00 CASE P COMP STAND BACK ONE STAND - PUMP DRY JOB - POH WITH
LINER RUNNING TOOL - LID SAME
16:00 - 19:00 3.00 STWHIP P PROD2 PJSM ON RUNNING WHIPSTOCK- PU BAKER
WHIPSTOCK ASSY. MWD & ORIENT-9 DC,S +15 H W 0
19:00 - 22:00 3.00 STWHIP P PROD2 SHALLOW TEST MWD - RIH WITH WHIPSTOCK TO 5265'
AND STING INTO TIE BACK-TOP OF WHIPSTOCK @5111'
P/U WT.1 05K -S/O 81 K
22:00 - 23:00 1.00 STWHIP P PROD2 SET WHIPSTOCK 7 DEGREES RIGHT OF HIGH SIDE-TOP
OF WINDOW @5111'
23:00 - 00:00 1.00 STWHIP P PROD2 MILL WINDOW FROM 5111' TO 5113' -WOB 2K-70 RPM
TO 6 -P/U 105K- SIO 81 - RIW 87
7/22/2002 00:00 - 04:30 4.50 STWHIP P PROD2 FINISH MILLING WINDOW FROM 511' TO 5143'
12' WINDOW &20 FT. OUT SIDE-80 RMP-TO 5K
TO 8 K -P/U 105K -S/O 81K- ROT 87K-72 STK
SPP 1000
04:30 - 06:00 1.50 STWHIP P PROD2 CIRC & CLEAN HOLE -AFTER MILLING WINDOW
06:00 - 07:30 1.50 STWHIP P PROD2 OBSERVE WELL - PUMP DRY JOB - POH FOR MILLING
BHA
07:30 - 08:30 1.00 STWHIP P PROD2 STAND BACK 3.5" HWDP /4.75" DC'S - LAY DOWN
MILLING ASSEMBLY
08:30 - 09:30 1.00 STWHIP P PROD2 RIG UP AND WASH OUT STACK WITH WASH TOOL
09:30 - 10:30 1.00 STWHIP P PROD2 PU DRILLING BHA # 10 - ORIENT - UP LOAD MWD -
SHALLOW TEST MWD
10:30 - 12:00 1.50 STWHIP P PROD2 TIH WITH BHA # 10 TO 4900'
12:00 - 13:30 1.50 STWHIP P PROD2 SLIP & CUT 98' DRILL LINE-IN SPECT & ADJUST BRAKES
SERVICE TOP DRIVE
13:30 - 14:00 0.50 STWHIP P PROD2 CONT.TIH TO TOP OF WINDOW @5111'-ORIENT THRU
WINDOW
14:00 - 00:00 10.00 DRILL P PROD2 DIRECTIONAL DRILL FROM 5143' TO 6150'-P/U WT. 103K
S/O 74K ROT. WT.83-TO ON BOT 4 K-OFF BOT 3 K-
WOB 2TO 12 K-RPM 80 -72 STKS ,250 GPM
DROPED OUT BASE OF SAND @5205'(4138' TVD )
REENTER SAND @ 5395' (4137 TVD) -FAULT @5920 I
(4113 TVD ) FAULTED TO LOWER PART OF SAND
Printed: 7/29/2002 4:41:08 PM
BP
Operations Summary Report
Page 6 of7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-05
MPS-05
DRILL +COMPLETE
DOYON
DOYON 141
Start: 7/11/2002
Rig Release: 7/27/2002
Rig Number: 141
Spud Date: 7/11/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
7/22/2002 14:00 - 00:00 10.00 DRILL P PROD2
7/23/2002 00:00 - 00:00 24.00 DRILL P PROD2 DRILL FROM 6150' TO 8600' -WOB 2-12 K--ROT 80
PI U 120K-S/060K-RW 80 K-TQ 717500 K AST 5.5 ART 9.5,
CROSS FAULT @ 8330 DRILLED SHALE TO 8590 BACK IN
SAND @ 8590
7/24/2002 00:00 - 01 :00 1.00 DRILL P PROD2 DRILL FROM 8600' TO 8745' TO -WOB 2-12 K-ROT 80,250
GPM 1800 PSI, PI U 120K-S/060K-RW 80 K-TQ 717500 K
ART.75 AST 0
01 :00 - 03:30 2.50 CASE P COMP CIRC UP BOTTOMS FOUR TIMES WITH 280 GPM, 2100
PSI, 100 RPMS
03:30 - 08:00 4.50 CASE P CaMP PUMP OUT TO CSG SHOE AND DISPLACING OPEN HOLE
WITH NEW MUD, MONITOR WELL, SLUG PIPE
08:00 - 09:30 1.50 CASE P COMP TRIPPING OUT TO BHA
09:30 - 11 :00 1.50 CASE P CaMP LAYING DOWN BHA
11 :00 - 12:30 1.50 CASE P COMP PICK UP WHIPSTOCK RETRIVING TOOL
12:30 - 14:00 1.50 CASE P CaMP TRIPPING IN WITH WHIPSTOCK RETRIVING TOOL TO
5050'
14:00 - 14:30 0.50CASE P CaMP ORIENT AND LATCH ON TO WHIPSTOCK PULL FREE
WITH 50,000# OVER PULL
14:30 -19:30 5.00 CASE P CaMP TRIPPING OUT WITH WHIPSTOCK AND LA YDOWN
WHIPSTOCK AND SPACE OUT TOOLS
19:30 - 20:30 1.00 CASE P COMP RIG UP CSG TOOLS AND PJSM
20:30 - 23:00 2.50 CASE P COMP PICK UP 1 JT OF 4.5 LINER AND 81 JTS OF 4.5 12.6 L-80
SLOTTED LINER AND HOOK WALL HANGER 3249'
23:00 - 00:00 1.00 CASE P CaMP TRIPPING IN WITH LINER
7/25/2002 00:00 - 02:00 2.00 CASE P CaMP TRIPPING IN WITH LINER WENT THRU WINDOW ON
FIRST TRY, TRIPPED IN TO OPEN HOLE WITH NO
PROBLEMS, STRING WT. 60,000# TOOK THREE TRYS TO
HOOK LINER HANGER, SHOE IS @ 8332' TOP OF LINER
5088'
02:00 - 03:00 1.00 CASE P CaMP DROP BALL PUMP DOWN @ 1 BBL MIN RELEASE FROM
LINER WITH 3000 PSI, PULL UP AND SHEAR BALL WITH
4,000#
03:00 - 08:00 5.00 CASE P COMP SLUG PIPE AND TRIP OUT STANDING BACK A TOTAL OF
55 STANDS, LAYING DOWN EXCESS PIPE, LINER
RUNNING TOOL
08:00 - 10:00 2.00 RUNCONP COMP TRIP IN WITH MULE SHOE, OPEN ENDED TO 5060
10:00 - 12:00 2.00 RUNCONP COMP DISPLACE WELL WITH 220 BBLS 8.8 SEAWATER FOLLOW
WITH 27 BBLS HI-VIS SPACER, 172 BBLS 8.8 SEAWATER,
255 BBLS 9.9 NACL
12:00 - 15:00 3.00 RUNCONP CaMP LAYING DOWN DRILL PIPE
15:00 - 15:30 0.50 RUNCONP CaMP PULL WEAR RING
15:30 - 16:30 1.00 RUNCONP COMP RIG UP CSG CREWS AND I WIRE SPOOL, PJSM
16:30 - 00:00 7.50 RUNCONP COMP PICKING UP COMPLETION PACKER AND TOOLS, RUN IN
ON 4.5,12.6, L-80, IBT, TUBING PIU WT 88,000 SIO WT
66,000
RUN WITH 66 I-WIRE CLAMPS
WIRE ENTRY GUIDE 5069, XN NIPPLE 5066, BAKER S-3
PACKER 5021, PHOENIX JET PUMP GAUGE SENSOR
4994', XD SLIDING SLEEVE 4974', PHOENIX DISCHARGE
PRESSURE GAUGE 4954', CAMeo KGB-2 GLM WIRP
VALVE 2016'
Printed: 7/29/2002 4:41 :08 PM
BP Page 7 of 7
Operations Summary Report
Legal Well Name: MPS-05
Common Well Name: MPS-05 Spud Date: 7/11/2002
Event Name: DRILL +COMPLETE Start: 7/11/2002 End:
Contractor Name: DOYON Rig Release: 7/27/2002
Rig Name: DOYON 141 Rig Number: 141
Date From - To Hours Task Code NPT Phase Description of Operations
7/26/2002 00:00 - 01 :30 1.50 RUNCOrvP COMP RIGGING UP TO LAND TUBING, LANDED SAME
01 :30 - 02:00 0.50 RIGD P COMP TEST TWO WAY CHECK TO 1,000 PSI
02:00 - 04:00 2.00 RIGD P COMP NIPPLE DOWN BOPS
04:00 - 05:30 1.50 RIGD P COMP NIPPLE UP TREE AND TEST TO 5,000 PSI
05:30 - 07:30 2.00 RIGD P COMP RIG UP LUBRICATOR AND PULL TWC HAD TROUBLE
PULLING TWC
07:30 - 11 :30 4.00 RIGD N SFAL COMP ATTEMPT TO SET BPV WOULDN'T GO, TRY TWC AND IT
WOULDN'T GO
11 :30 - 13:30 2.00 RIGD N SFAL COMP RIG UP HALIBURTON SLICK LINE UNIT
13:30 - 16:00 2.50 RIGD N SFAL COMP RIH WITH PLUG AND SET @ 4972' AND PULL OUT OF
HOLE
16:00 - 16:30 0.50 RIGD N SFAL COMP TEST PLUG WITH 2000 PSI FOR 15 MIN., NIPPLE DOWN
TREE
16:30 - 17:30 1.00 RIGD N SFAL COMP REPAIR TWC SEAL AREA OF HANGER, HONE SEAL
-INSPECT AND DRY RUN TWC AND BPV THREE TIMES
AND THEY WENT IN OK
17:30 - 18:00 0.50 RIGD N SFAL COMP NIPPLE UP TREE AND TEST HANGER VOID TO 5000 PSI
FOR 10 MIN.
18:00 - 20:00 2.00 RIGD N SFAL COMP RUN IN WITH SLICK LINE AND RETRIEVE PLUG, RIG
DOWN HALIBURTON UNIT
20:00 - 20:30 0.50 RIGD N SFAL COMP SET TWC AND TEST 41/16 TREE TO 5000 PSI10MIN
20:30 - 00:00 3.50 RIGD N SFAL COMP RIG UP LUBRICATOR AND PULL TWC AND A TTEMP TO
INSTALL BPV WOULDN'T GO BUT A HALF TURN, TRY TWO
DIFFERENT BPV, THE SAME ONES THAT SCREW IN
WITHOUT TREE ON, TRYED TWC AND IT WENT IN, TEST
CHECK TO 2,000#
7/27/2002 00:00 - 01 :00 1.00 RIGD N SFAL COMP NIPPLE DOWN TREE
01 :00 - 02:30 1.50 RIGD N SFAL COMP NIPPLE UP BOPS
02:30 - 03:00 0.50 RIGD N SFAL COMP TEST BOPS TOP RAMS AND SERVICE BREAKS TO
250-3500 PSI FOR 10 MIN.
03:00 - 04:30 1.50 RIGD N SFAL COMP RIG UP LUBRICATOR AND PULL TWC, RIG DOWN
LUBRICATOR
04:30 - 06:00 1.50 RIGD N SFAL COMP RIG UP TO PULL TUBING HANGER, PULLED HANGER
WITH 85,000#, CHANGING OUT HANGER
06:00 - 08:00 2.00 RIGD N SFAL COMP DRY RUN BPV AND TWC IN NEW HANGER, INSTALL
I-WIRE,LAND TUBING
08:00 - 08:30 0.50 RIGD N SFAL COMP TEST TWC 1000# FOR TEN MIN.
08:30 - 09:30 1.00 RIGD N SFAL COMP NIPPLE DOWN BOPS
09:30 -10:30 1.00 RIGD N SFAL COMP NIPPLE UP TREE AND TEST TO 5000#
10:30 - 11 :30 1.00 RIGD N SFAL COMP RIG UP LUBRICATOR ATTEMP TO PULL TWC
LOST BOTTOM PART OF RETRIVEING TOOL IN TREE, RIG
DOWN LUBRICATOR
11 :30 - 13:00 1.50 RIGD N SFAL COMP NIPPLE DOWN TREE AND RETRIVE TOOLS AND
RENIPPLE UP TREE
13:00 - 14:00 1.00 RIGD N SFAL COMP TEST VOID AND TREE TO 5000# FOR 10 MIN.
14:00 - 14:30 0.50 RIGD P COMP PULL TWC AND SET BPV AND SECURE WELL
RIG RELEASE FOR RIG MOVE 14:30 7/27/2002
Printed: 7/29/2002 4:41 :08 PM
(
é1C8-J3~
14-Aug-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well MPS-05L 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 5,038.65' MD
Window / Kickoff Survey 5,111.00' MD (if applicable)
Projected Survey: 8,745.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
1\, llf' 2 -
h!,.¡,:; \.) 2002
Alaalcaœ" Gas Cons. Com .
Anchorage mISion
D... CF. '" II'" V-:
. ~ ~ -
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
Milne Point MPS, Slot MPS-05
MPS-05L 1
Job No. AKZZ22118, Surveyed: 24 July, 2002
~"
SURVEY REPORT
13 August, 2002
Your Ref: API 500292310060
Surface Coordinates: 6000029.59 N, 566018.85 E (700 24' 37.8645" N, 1490 27' 44.7176" W)
Kelly Bushing: 66.80ft above Mean Sea Level
.~
!lpe'-''-'Y-IIUf1
OAILL.NG SERVices
A Halliburton Company
Survey Ref: svy10159
Sperry-Sun Drilling Services .
Survey Report for MPS-05L 1
Your Ref: API 500292310060
Job No. AKZZ22118, Surveyed: 24 July, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inet. Azim. Depth Depth Northlngs Eaatlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
5038.65 63.790 176.320 4016.36 4083.16 629.00 N 1536.50 E 6000672.15 N 567549.73 E -737.51 Tie On Point ."-"'c
5111.00 69.330 177.900 4045.13 4111.93 562.73 N 1539.83 E 6000605.91 N 567553.65 E 7.915 -671.65 Window Point
5123.00 70.510 178.250 4049.25 4116.05 551.47 N 1540.21 E 6000594.65 N 567554.12 E 10.208 -660.44
5180.26 75.490 179.870 4065.99 4132.79 496.74 N 1541.10 E 6000539.93 N 567555.50 E 9.108 -605.91
5231.51 83.950 181.250 4075.13 4141.93 446.36 N 1540.60 E 6000489.55 N 567555.44 E 16.718 -555.63
5274.06 89.450 182.360 4077.57 4144.37 403.92 N 1539.26 E 6000447.10 N 567554.48 E 13.186 -513.20
5322.89 94.990 183.630 4075.68 4142.48 355.21 N 1536.71 E 6000398.37 N 567552.36 E 11.639 -464.44
5367.01 94.680 184.580 4071.96 4138.76 311.36 N 1533.56 E 6000354.50 N 567549.60 E 2.258 -420.47
5415.48 94.250 184.110 4068.19 4134.99 263.18 N 1529.90 E 6000306.28 N 567546.37 E 1.312 -372.15
5460.39 94.070 183.540 4064.93 4131.73 218.49 N 1526.91 E 6000261.56 N 567543.77 E 1.328 -327.36
5510.04 93.820 182.840 4061.52 4128.32 169.03 N 1524.16 E 6000212.09 N 567541.45 E 1.494 -277.83
5553.70 93.700 182.480 4058.65 4125.45 125.51 N 1522.14 E 6000168.55 N 567539.82 E 0.867 -234.28
5602.63 91.910 184.030 4056.26 4123.06 76.72 N 1519.36 E 6000119.74 N 567537.47 E 4.837 -185.42
5647.24 91.780 183.310 4054.82 4121.62 32.23 N 1516.51 E 6000075.22 N 567535.01 E 1.639 -140.84
5696.28 92.770 185.750 4052.88 4119.68 16.62 S 1512.64 E 6000026.35 N 567531.57 E 5.366 -91.84
5741.34 93.760 185.700 4050.31 4117.11 61.38 S 1508.15 E 5999981.55 N 567527.48 E 2.200 -46.87
5789.85 91.850 186.440 4047.94 4114.74 109.56 S 1503.03 E 5999933.32 N 567522.79 E 4.222 1.55
5834.60 90.550 188.380 4047.00 4113.80 153.92 S 1497.26 E 5999888.91 N 567517.41 E 5.218 46.21 ~
5885.09 89.880 187.960 4046.81 4113.61 203.90 S 1490.08 E 5999838.87 N 567510.68 E 1.566 96.58
5927.72 89.820 191.620 4046.92 4113.72 245.90 S 1482.83 E 5999796.81 N 567503.80 E 8.587 138. 99
5977.84 89.820 194.620 4047.08 4113.88 294.70 S 1471.46 E 5999747.90 N 567492.86 E 5.986 188.48
6021.49 87.170 195.330 4048.22 4115.02 336.85 S 1460.18E 5999705.66 N 567481.95 E 6.285 231.33
6072.57 86.800 194.830 4050.91 4117.71 386.11 S 1446.91 E 5999656.29 N 567469.12 E 1.217 281.41
6114.74 90.250 197.490 4052.00 4118.80 426.59 S 1435.18 E 5999615.71 N 567457.75 E 10.329 322.63
6165.49 92.460 199.910 4050.80 4117.60 474.64 S 1418.92 E 5999567.51 N 567441.91 E 6.456 371.72
13209.03 92.650 199.280 4048.86 4115.66 515.61 S 1404.33 E 5999526.41 N 567427.68 E 1.510 413.64
6257.84 94.560 200.050 4045.79 4112.59 561.48 S 1387.94 E 5999480.40 N 567411.70 E 4.218 460.56
6302.07 94.380 199.430 4042.34 4109.14 602.99 S 1373.05 E 5999438.76 N 567397.17 E 1 .456 503.03
13353.33 96.040 201.590 4037.68 4104.48 650.80 S 1355.16 E 5999390.80 N 567379.71 E 5.301 552.00
6395.67 93.200 202.230 4034.27 4101.07 689.95 S 1339.42 E 5999351.51 N 567364.31 E 6.875 592.17
13 August, 2002 - 11:26
Page 20f5
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report for MPS-05L 1
Your Ref: API 500292310060
Job No. AKZZ22118, Surveyed: 24 July, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
6445.13 92.590 202.240 4031.78 4098.58 735.67 S 1320.72 E 5999305.62 N 567346.03 E 1.233 639.12 ft~
6489.15 90.000 203.520 4030.78 4097.58 776.21 S 1303.62 E 5999264.93 N 567329.28 E 6.563 680.78
6540.01 88.520 205.160 4031 .44 4098.24 822.54 S 1282.66 E 5999218.42 N 567308.73 E 4.343 728.50
6582.14 88.710 207.820 4032.46 4099.26 860.24 S 1263.87 E 5999180.56 N 567290.28 E 6.328 767.44
6632.71 90.250 209.150 4032.92 4099.72 904.68 S 1239.76 E 5999135.90 N 567266.55 E 4.024 813.50
6676.05 86.860 211.790 4034.01 4100.81 942.01 S 1217.79 E 5999098.38 N 567244.92 E 9.912 852.31
6724.76 82.900 214.760 4038.36 4105.16 982.57 S 1191.18 E 5999057.59 N 567218.67 E 10.147 894.66
6769.23 81.550 217.150 4044.37 4111.17 1018.23 S 1165.32 E 5999021.70 N 567193.12 E 6.129 932.09
6820.11 80.970 217.150 4052.10 4118.90 1058.31 S 1134.95 E 5998981.35 N 567163.11 E 1.140 974.25
6862.60 80.4 70 217.760 4058.96 4125.76 1091.60 S 1109.45 E 5998947.84 N 567137.90 E 1.842 1009.28
6912.41 81.040 217.270 4066.96 4133.76 1130.60 S 1079.51 E 5998908.58 N 567108.31 E 1.501 1050.32
6956.13 86.860 217.300 4071.56 4138.36 1165.17 S 1053.18 E 5998873.77 N 567082.29 E 13.312 1086.69
7009.28 91.050 216.960 4072.53 4139.33 1207.53 S 1021.11 E 5998831.13 N 567050.60 E 7.909 1131.24
7049.89 91.110 216.940 4071.77 4138.57 1239.98 S 996.71 E 5998798.47 N 567026.48 E 0.156 1165.36
7099.33 91.050 216.050 4070.84 4137.64 1279.72 S 967.31 E 5998758.47 N 566997.43 E 1.804 1207.1 0
7143.49 90.490 211.580 4070.24 4137.04 1316.39 S 942.74 E 5998721.58 N 566973.19 E 10.200 1245.44
7194.97 90.120 210.630 4069.97 4136.77 1360.47 S 916.15 E 5998677.27 N 566946.99 E 1.980 1291.31
7237.05 90.180 210.140 4069.86 4136.66 1396.77 S 894.86 E 5998640.78 N 566926.02 E 1.173 1329.04 ~.
7286.31 88.220 210.150 4070.55 4137.35 1439.36 S 870.13 E 5998597.97 N 566901.67 E 3.979 1373.30
7329.35 87.600 209.920 4072.12 4138.92 1476.60 S 848.60 E 5998560.55 N 566880.47 E 1.536 1411 .98
7379.13 90.430 211.650 4072.97 4139.77 1519.35 S 823.13 E 5998517.57 N 566855.38 E 6.663 1456.45
7422.06 90.180 210.790 4072.74 4139.54 1556.06 S 800.88 E 5998480.67 N 566833.45 E 2.086 1494.66
7473.33 91.720 212.170 4071.89 4138.69 1599.78 S 774.11 E 5998436.72 N 566807.07 E 4.033 1540.18
7516.69 91.970 212.470 4070.50 4137.30 1636.40 S 750.94 E 5998399.89 N 566784.22 E 0.900 1578.37
7565.91 92.960 212.880 4068.38 4135.18 1677.80 S 724.39 E 5998358.26 N 566758.04 E 2.177 1621.56
7609.86 92.530 212.690 4066.28 4133.08 1714.70 S 700.62 E 5998321.15 N 566734.60 E 1.069 1660.08
7660.05 94.930 213.120 4063.01 4129.81 1756.75 S 673.41 E 5998278.86 N 566707.77 E 4.858 1703.97
7702.26 . 95.050 213.270 4059.34 4126.14 1791.94 S 650.39 E 5998243.47 N 566685.06 E 0.454 1740.71
7753.17 95.180 212.870 4054.80 4121.60 1834.43 S 622.72 E 5998200.74 N 566657.76 E 0.823 1785.08
7796.63 95.300 212.780 4050.83 4117.63 1870.80 S 599.26 E 5998164.16 N 566634.63 E 0.345 1823.04
13 August, 2002 - 11:26
Page 30'5
DrillQllest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report for MPS-05L 1
Your Ref: API 500292310060
Job No. AKZZ22118, Surveyed: 24 July, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft)
7846.23 94.190 213.020 4046.73 4113.53 1912.30 S 572.41 E 5998122.43 N 566608.15 E 2.289 1866.35
7889.38 92.090 212.220 4044.36 4111.16 1948.59 S 549.19 E 5998085.94 N 566585.24 E 5.207 1904.21
7940.72 91.970 210.880 4042.55 4109.35 1992.31 S 522.34 E 5998041.98 N 566558.78 E 2.619 1949.75
7982.91 91.730 205.560 4041.18 4107.98 2029.45 S 502.41 E 5998004.66 N 566539.18 E 12.616 1988.22
8034.06 90.000 200.830 4040.41 4107.21 2076.45 S 482.28 E 5997957.49 N 566519.46 E 9.845 2036.54
8076.66 89.690 200.190 4040.53 4107.33 2116.34 S 467.35 E 5997917.46 N 566504.89 E 1.669 2077.41
8127.75 89.690 200.320 4040.80 4107.60 2164.27 S 449.66 E 5997869.37 N 566487.63 E 0.254 2126.48
8170.89 91.170 202.750 4040.48 4107.28 2204.40 S 433.83 E 5997829.11 N 566472.15 E 6.595 2167.64
8220.21 92.400 203.460 4038.94 4105.74 2249.74 S 414.49 E 5997783.60 N 566453.21 E 2.879 2214.25
8263.65 92.710 203.460 4037.01 4103.81 2289.55 S 397.21 E 5997743.64 N 566436.28 E 0.714 2255.19
8314.53 91.420 202.790 4035.17 4101.97 2336.31 S 377.24 E 5997696.71 N 566416.73 E 2.857 2303.26
8358.16 90.980 202.640 4034.26 4101.06 2376.55 S 360.40 E 5997656.32 N 566400.24 E 1.065 2344.60
8408.10 93.210 203.060 4032.43 4099.23 2422.53 S 341.02 E 5997610.17 N 566381.27 E 4.544 2391.86
8450.62 96.480 204.280 4028.84 4095.64 2461.33 S 324.01 E 5997571.22 N 566364.61 E 8.205 2431.78
8501.29 101.090 207.500 4021.10 4087.90 2506.37 S 302.16 E 5997525.99 N 566343.16 E 11.054 2478.26
8544.11 102.900 207.890 4012.20 4079.00 2543.45 S 282.70 E 5997488.74 N 566324.02 E 4.320 2516.65
8595.46 102.230 207.560 4001.03 4067.83 2587.82 S 259.38 E 5997444.17 N 566301.10 E 1 .448 2562.57
8636.68 102.040 207.830 3992.37 4059.17 2623.50 S 240.65 E 5997408.32 N 566282.68 E 0.789 2599.50 .c~
8678.76 101.840 207.160 3983.66 4050.46 2660.02 S 221.64 E 5997371.63 N 566264.00 E 1.629 2637.29
8745.00 101.840 207.160 3970.07 4036.87 2717.70 S 192.05 E 5997313.69 N 566234.92 E 0.000 2696.95 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 184.110° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 8745.00ft.,
The Bottom Hole Displacement is 2724.48ft., in the Direction of 175.958° (True).
13 August, 2002 - 11:26
Page 4 0'5
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for MPS-05L 1
Your Ref: API 500292310060
Job No. AKZZ22118, Surveyed: 24 July, 2002
.
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
BPXA
Milne Point MPS
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
~ ~ ~
Comment
5038.65
5111.00
8745.00
4083.16
4111.93
4036.87
629.00 N
562.73 N
2717.70 S
1536.50 E
1539.83 E
192.05 E
Tie On Point
Window Point
Projected Survey
Survey tool program for MPS-05L 1
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
Survey Tool Description
0.00
0.00
8745.00
4036.87 AK-6 BP _IFR-AK (MPS-05PB1)
~,
13 August, 2002 - 11:26
Page 5 0'5
DrillQuest 2.00.08.005
(
é1c8~/3¿)
14-Aug-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-05L 1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 5,038.65' MD
Window / Kickoff Survey 5,111.00 I MD (if applicable)
Projected Survey: 8,745.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~) "\ :)iJ"'O~2
...... v L....
~'~~~p r'~i5~. ~"~ce:' ,f'I>$ I'< '" t'"
0# Mõïf,IJ:"~ . - ~ ~J¡ .;.t:, ,,~T'~~N:~ '"~~)~J~I'-¡'~ ~;::<:~~"~'~(~ ~' ~f~~~~ ;
BPEXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
Milne Point MPS, Slot MPS-05
MPS.05L 1 MWD
Job No. AKMW22118, Surveyed: 24 July, 2002
SURVEY REPORT
13 August, 2002
Your Ref: API 500292310060
Surface Coordinates: 6000029.59 N, 566018.85 E (70024' 37.8645" N, 149027' 44.7176" W)
Kelly Bushing: 66.80ft above Mean Sea Level
~"
Eiplll'r'Y-EiUI1
DFHI...LINGSEAVICes
A Halliburton Company
Survey Ref: 5vy10160
Sperry-Sun Drilling Services .
Survey Report for MPS-05L 1 MWD
Your Ref: API 500292310060
Job No. AKMW22118, Surveyed: 24 July, 2002
if
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
5038.65 63.790 175.970 4016.36 4083.16 629.29 N 1537.03 E 6000672.45 N 567550.26 E -737.84 Tie On Point
5111.00 69.330 177.900 4045.13 4111.93 563.04 N 1540.56 E 6000606.22 N 567554.37 E 8.038 -672.00 Window Point
5123.00 70.510 178.250 4049.25 4116.05 551.77 N 1540.93 E 6000594.96 N 567554.85 E 10.208 -660.80
5180.26 75.490 179.870 4065.99 4132.79 497.04 N 1541.82E 6000540.24 N 567556.22 E 9.108 -606.27
5231.51 83.950 181.250 4075.13 4141.93 446.66 N 1541.32 E 6000489.86 N 567556.16 E 16.718 -555.98
5274.06 89.450 182.360 4077.57 4144.37 404.22 N 1539.98 E 6000447.41 N 567555.20 E 13.186 -513.56
5322.89 94.990 183.720 4075.68 4142.48 355.52 N 1537.40 E 6000398.68 N 567553.04 E 11 .682 -464.79
5367.01 94.680 184.790 4071.97 4138.77 311.68N 1534.13E 6000354.82 N 567550.17 E 2.517 -420.83
5415.48 94.250 184.320 4068.19 4134.99 263.51 N 1530.30 E 6000306.61 N 567546.76 E 1.312 -372.51
5460.39 94.070 183.4 70 4064.93 4131.73 218.82 N 1527.25 E 6000261.90 N 567544.11 E 1.930 -327.72
5510.04 93.820 182.870 4061.52 4128.32 169.36 N 1524.52 E 6000212.42 N 567541.81 E 1.307 -278.19
5553.70 93.700 182.810 4058.65 4125.45 125.85 N 1522.36 E 6000168.89 N 567540.04 E 0.307 -234.64
5602.63 91.910 184.050 4056.26 4123.06 77.07 N 1519.43 E 6000120.09 N 567537.54 E 4.449 -185.77
5647.24 91.780 183.420 4054.82 4121.62 32.58 N 1516.53 E 6000075.57 N 567535.03 E 1 .441 -141.19
5696.28 92.770 185.990 4052.88 4119.68 16.25 S 1512.51 E 6000026.71 N 567531.44 E 5.612 -92.19
5741.34 93.760 186.010 4050.31 4117.11 60.99 S 1507.81 E 5999981.93 N 567527.14 E 2.198 -47.23
5789.85 91.850 186.590 4047.94 4114.74 109.15 S 1502.49 E 5999933.73 N 567522.25 E 4.114 1.18
5834.60 90.550 188.380 4047.00 4113.80 153.51 S 1496.66 E 5999889.32 N 567516.81 E 4.943 45.84
5885.09 89.880 188.210 4046.81 4113.61 203.47 S 1489.38 E 5999839.30 N 567509.97 E 1.369 96.20
5927.72 89.820 192.030 4046.92 4113.72 245.43 S 1481.89 E 5999797.27 N 567502.85 E 8.962 138.59
5977.84 89.820 195.270 4047.08 4113.88 294.12 S 1470.06 E 5999748.47 N 567491.46 E 6.464 188.01
6021.49 87.170 196.830 4048.23 4115.03 336.05 S 1458.00 E 5999706.44 N 567479.76 E 7.044 230.69
6072.57 86.800 196.380 4050.91 4117.71 384.93 S 1443.42 E 5999657.43 N 567465.62 E 1.140 280.49
6114.74 90.250 197.540 4052.00 4118.80 425.25 S 1431.13 E 5999617.01 N 567453.68 E 8.631 321.59
6165.49 92.460 200.770 4050.80 4117.60 473.17 S 1414.49 E 5999568.94 N 567437.46 E 7.710 370.57
6209.03 92.650 199.520 4048.86 4115.66 514.00 S 1399.51 E 5999527.98 N 567422.84 E 2.901 412.38
6257.84 94.560 200.320 4045.79 4112.59 559.80 S 1382.91 E 5999482.04 N 567406.65 E 4.241 459.24
6302.07 94.380 199.900 4042.34 4109.14 601.21 S 1367.75 E 5999440.50 N 567391.86 E 1.030 501.63
6353.33 96.040 202.340 4037.69 4104.49 648.82 S 1349.36 E 5999392.72 N 567373.89 E 5.741 550.44
6395.67 93.200 202.930 4034.27 4101.07 687.77 S 1333.12 E 5999353.63 N 567357.99 E 6.850 590.45
13 August, 2002 - 11:27
Page 2 0'5
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report for MPS-05L 1 MWD
Your Ref: API 500292310060
Job No. AKMW22118, Surveyed: 24 July, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
6445.13 92.590 202.790 4031.78 4098.58 733.29 S 1313.93 E 5999307.95 N 567339.21 E 1.265 637.23
6489.15 90.000 203.890 4030.78 4097.58 773.69 S 1296.49 E 5999267.39 N 567322.13 E 6.392 678.78
6540.01 88.520 205.130 4031.44 4098.24 819.96 S 1275.40 E 5999220.94 N 567301.45 E 3.796 726.44
6582.14 88.710 207.740 4032.46 4099.26 857.67 S 1256.65 E 5999183.06 N 567283.03 E 6.210 765.40
6632.71 90.250 209.250 4032.92 4099.72 902.11 S 1232.53 E 5999138.41 N 567259.30 E 4.265 811.45
6676.05 86.860 211.450 4034.01 4100.81 939.49 S 1210.64 E 5999100.84 N 567237.75 E 9.323 850.31
6724.76 82.900 214.590 4038.36 4105.16 980.16 S 1184.21 E 5999059.94 N 567211.68 E 10.359 892.76
6769.23 81.550 217.150 4044.37 4111.17 1015.86 S 1158.40 E 5999024.01 N 567186.18 E 6.461 930.22
6820.11 80.970 216.820 4052.10 4118.90 1056.03 S 1128.14 E 5998983.57 N 567156.29 E 1.308 972.46
6862.60 80.470 217.340 4058.96 4125.76 1089.49 S 1102.86 E 5998949.90 N 567131.30 E 1.686 1007.64
6912.41 81.040 217.270 4066.96 4133.76 1128.59 S 1073.07 E 5998910.53 N 567101.85 E 1.153 1048.78
6956.13 86.860 216.970 4071.56 4138.36 1163.24 S 1046.84 E 5998875.65 N 567075.93 E 13.329 1085.22
7009.28 91.050 216.280 4072.53 4139.33 1205.88 S 1015.15 E 5998832.73 N 567044.62 E 7.989 1130.02
7049.89 91.110 216.940 4071.77 4138.57 1238.47 S 990.93 E 5998799.92 N 567020.69 E 1.632 1164.27
7099.33 91.050 215.360 4070.84 4137.64 1278.39 S 961.77 E 5998759.75 N 566991.89 E 3.198 1206.17
7143.49 90.490 210.900 4070.24 4137.04 1315.36 S 937.65 E 5998722.57 N 566968.09 E 10.178 1244.77
7194.97 90.120 210.630 4069.97 4136.77 1359.59 S 911.31 E 5998678.11 N 566942.15 E 0.890 1290.78
7237.05 90.180 208.950 4069.86 4136.66 1396.11 S 890.41 E 5998641.41 N 566921.56 E 3.995 1328.70 .~
7286.31 88. 220 207.380 4070.55 4137.35 1439.53 S 867.16 E 5998597.78 N 566898.70 E 5.098 1373.68
7329.35 87.600 208.900 4072.12 4138.92 1477.45 S 846.88 E 5998559.68 N 566878.75 E 3.812 1412.96
7379.13 90.430 210.740 4072.97 4139.77 1520.63 S 822.13 E 5998516.29 N 566854.39 E 6.780 1457.80
7422.06 90.180 210.160 4072.74 4139.54 1557.64 S 800.37 E 5998479.09 N 566832.96 E 1.471 1496.27
7473.33 91.720 211.410 4071.89 4138.69 1601.68 S 774.14 E 5998434.82 N 566807.11 E 3.868 1542.07
7516.69 91.970 211.690 4070.50 4137.30 1638.61 S 751.46 E 5998397.69 N 566784.77 E 0.865 1580.53
7565.91 92.960 212.250 4068.38 4135.18 1680.32 S 725.43 E 5998355.75 N 566759.10 E 2.310 1624.01
7609.86 92.530 212.450 4066.28 4133.08 1717.41 S 701.93 E 5998318.45 N 566735.94 E 1.079 1662.68
7660.05 94.930 212.660 4063.01 4129.81 1759.62 S 674.99 E 5998276.01 N 566709.36 E 4.800 1706.72
7702.26 95.050 213.220 4059.34 4126.14 1794.91 S 652.12 E 5998240.51 N 566686.81 E 1.352 1743.56
7753.17 95.180 212.910 4054.80 4121.60 1837.41 S 624.46 E 5998197.78 N 566659.52 E 0.658 1787.92
7796.63 95.300 212.650 4050.83 4117.63 1873.79 S 601.02 E 5998161.18 N 566636.41 E 0.657 1825.90
13 August, 2002 - 11:27
Page 30'5
DriflQuest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report for MPS-05L 1 MWD
Your Ref: API 500292310060
Job No. AKMW22118, Surveyed: 24 July, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7846.23 94.190 212.930 4046.73 4113.53 1915.34 S 574.26 E 5998119.40 N 566610.01 E 2.308 1869.26
7889.38 92.090 212.110 4044.36 4111.16 1951.67 S 551.09 E 5998082.87 N 566587.17 E 5.224 1907.16
7940.72 91.970 210.960 4042.55 4109.35 1995.40 S 524.26 E 5998038.90 N 566560.73 E 2.251 1952.70
7982.91 91.730 205.890 4041 .18 4107.98 2032.47 S 504.19 E 5998001.65 N 566540.99 E 12.024 1991.11
8034.06 90.000 201.370 4040.41 4107.21 2079.32 S 483.70 E 5997954.63 N 566520.91 E 9.461 2039.30
8076.66 89.690 200.610 4040.53 4107.33 2119.09 S 468.44 E 5997914.72 N 566506.01 E 1.927 2080.07
8127.75 89.690 200.500 4040.80 4107.60 2166.93 S 450.50 E 5997866.73 N 566488.49 E 0.215 2129.06
8170.89 91.170 203.010 4040.48 4107.28 2206.99 S 434.52 E 5997826.53 N 566472.86 E 6.754 2170.17
8220.21 92.400 203.700 4038.94 4105.74 2252.24 S 414.98 E 5997781.10 N 566453.72 E 2.859 2216.71
8263.65 92.710 203.710 4037.01 4103.81 2291.98 S 397.53 E 5997741.21 N 566436.62 E 0.714 2257.59
8314.53 91.420 203.040 4035.17 4101.97 2338.65 S 377.36 E 5997694.37 N 566416.86 E 2.857 2305.59
8358.16 90.980 202.840 4034.26 4101.06 2378.82 S 360.35 E 5997654.05 N 566400.22 E 1.108 2346.88
8408.10 93.210 203.020 4032.43 4099.23 2424.78 S 340.91 E 5997607.92 N 566381 .18 E 4.480 2394.11
8450.62 96.480 204.430 4028.84 4095.64 2463.56 S 323.87 E 5997568.98 N 566364.48 E 8.370 2434.02
8501.29 101.090 207.600 4021.10 4087.90 2508.55 S 301.92 E 5997523.81 N 566342.93 E 10.999 2480.46
8544.11 102.900 208.030 4012.20 4079.00 2545.60 S 282.38 E 5997486.59 N 566323.72 E 4.340 2518.81
8595.46 102.230 207.740 4001.03 4067.83 2589.90 S 258.94 E 5997442.08 N 566300.67 E 1.416 2564.68
8636.68 102.040 208.030 3992.37 4059.17 2625.52 S 240.09 E 5997406.30 N 566282.14 E 0.828 2601.56 ~'"
8678.76 101.840 207.250 3983.66 4050.46 2661.99 S 220.99 E 5997369.66 N 566263.36 E 1.875 2639.30
8745.00 101.840 207.250 3970.07 4036.87 2719.62 S 191.31 E 5997311.76 N 566234.19 E 0.000 2698.92 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 184.110° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 8745.00ft.,
The Bottom Hole Displacement is 2726.34ft., in the Direction of 175.976° (True).
13 August, 2002 - 11:27
Page 4 of5
DrillQlIest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for MPS-05L 1 MWD
Your Ref: API 500292310060
Job No. AKMW22118, Surveyed: 24 July, 2002
. '.
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
BPXA
Milne Point MPS
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
~.
5038.65
5111.00
8745.00
4083.16
4111.93
4036.87
629.29 N
563.04 N
2719.62 S
1537.03 E
1540.56 E
191.31 E
Tie On Point
Window Point
Projected Survey
Survey tool program for MPS-05L 1 MWD
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
Survey Tool Description
0.00
0.00
8745.00
4036.87 MWD Magnetic (MPS-05PB1 MWD)
/'~'"
13 August, 2002 - 11:27
Page 50f5
DrillQllest 2.00.08.005
\,
:
@ 11' ~ If fE rr: íþ Æ\ n . Œ\.. ~ ~.1. ~
Œ) u W U Lb liJ) J lfl'J Lb Lru Q:!) tJ \J, uu
AI4ASIiA. OIL AND GAS
CONSERVATION COMMISSION
/
/
/
¡
I
¡
TONY KNOWLES, GOVERNOR
333 W. ]TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re:
Milne Point Unit MPS-05L 1
BP Exploration (Alaska), Inc.
Permit No: 202-138
Surface Location: 3360' NSL, 4772' WEL, Sec. 07, T12N, RIlE, UM
Bottomhole Location: 636' NSL, 186' WEL, Sec. 12, T12N, RlOE, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to drill the above development well.
The permit to drill does not exempt you from obtaining additional. permits or approvals required by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
The permit is for a new wellboresegment of existing well MPS-05, Permit No 202-137, API 50-
029-23100. Production should continue to be reported as a function of the original API number
stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient
notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe
must be given so that a representative of the Commission may witness the test. . Notice may be given by
contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Cw .~.~~¡
Cam~echsli Tayï~;Ô -
Chair
BY ORDER OF THE COMMISSION
DATED this~ day of July, 2002
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
1 a. Type of work Ü Drill 1m Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3360' NSL, 4772' WEL, SEC. 07, T12N, R11E, UM
At top of productive interval
3706' NSL, 32161 WEL, SEC. 07, T12N, R11E, UM (OA)
At total depth
6361 NSL, 186' WEL, SEC. 12, T12N, R10E, UM (OA)
12. Distance to nearest property line 13. Distance to nearest well /
ADL 380110, 186' MD (Approx.) No Close Approach
16. To be completed for deviated wells
Kick Off Depth 3001 MD Maximum Hole Angle
18. Casin~ Program Specifications
$Ize
,HQle Casing Weight Grade CouDlinQ
/ 6-1/81' 4-1/211 12.6# L-80 IBT
(.. STATE OF ALASKA
ALASKA .--.a- AND GAS CONSERVATION COM~ .--ION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Planned KBE = 68' Milne Point Unit / Schrader
6. Property Designation Bluff
ADL380109
7. Unit or Property Name
Milne Point Unit
8. Well Number /
MPS-05L 1
9. Approximate spud date.
July 12, 2002/ Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 9007' MD /41921 TVD
0 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
92 Maximum surface 1488 psig, Attotal depth (TVD) 4256'/1914 psig
Setting Depth
TQp Botom Quantitv of Cement
LenQth MD TVD M.D TVD (include staQe data) ~
3637' 5370' 4165' 90071 4192' Uncemented Slotted Liner /'
\t.J 6A ï IlloL
~
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
9015 feet
4246 feet
feet
feet
Plugs (measured)
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
821
5550'
2011
7-5/811
260 sx Arctic Set (Approx.
966 sx PF IL', 285 sx Class 'G'
112'
5580'
1121
4217'
34351
4-1/211
Uncemented Slotted Liner
RECEI\/FD
JUL 0 1 2002
5580' - 9015'
4217' - 4246'
Perforation depth: measured
Alaska Oil & Gas Cons. LÙllílfllt;Slm,
Ii Filing Fee 0 Property Plat 8"s~W§i~tch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Matt Green, 564-5581 Steve Campbell, 564-4401 Prepared By NameINumber: Sondra Stewman, 564-4750
21. I hereby certify that the foregoing is true nd correct to the best of my knowledge
Signed Pat Archey 3 Title Senior Drilling Engineer
true vertical
ORIGINAL
20. Attachments
Date
hp ø/aq
Approved By
Form 10-401 Rev. 12-01-85
Commissioner
~~S~W1te See cover letter
,,- /. "I C/ Þ for other reauirements
Mud Lo Required 0 Yes œ1 No
Directional Survey Required EI Yes 0 No
D4K D5K D10K 0 15K 0 3.5K psi for CTU
by order of -7 ;; ~
the commission Date ~i~ ;;::te
Permit Number
...2 <::").<:... - /? 7
Conditions of Approval:
API Number
50- o¿7 - z 3/öo- bO
Samples Required 0 Yes m No
Hydrogen Sulfide Measures 0 Yes EJ No
Required Working Pressure for BOPE 0 2K 0 3K
Other: Te~t- B ~..p E Þ, 400() P S,.' .
(
I Well Name: I MPS-05 L 1
Drill and Complete Plan Summary
Milne por '.liPS-OS Well Permit
I Type of Well (service / producer / injector): 1 Multi Lateral Producer "OA" & "08"
19191 FNL, (33601 FSL), 47721 FEL, (81 FWL), SEC. 7, T12N, R11 E
E=566018.85 N=6000029.59
15731 FNL, (37061 FSL), 3216 FEL, (15631 FWL), SEC. 7, T12N,R11 E
E=567570.46 N=6000389.85 Z=4176' TVD
46421 FNL, (6361 FSL), 186 FEL, (50921 FWL), SEC. 12, T12N,R1 OE
E=565847.00 N=5997304.00 Z=4192' TVD
1778' FNL, (3500' FSL), 3217' FEL, (15621 FWL), SEC. 7, T12N,R11 E
E=567571.37 N=6000184.33 Z=4223' TVD
46421 FNL, (636' FSL), 186 FEL, (5092' FWL), SEC. 12, T12N,R10E
E=565847.00 N=5997304.00 Z=4246' TVD
46421 FNL, (6361 FSL), 186 FEL, (50921 FWL), SEC. 12, T12N,R10E
E=565847.00 N=5997304.00 Z=4246' TVD
1 AFE Number: 1 MSD337291 I Rig: 1 Doyon 141 I
I Estimated Start Date: 112 Jul 2002 1 Operating days to complete: 117.1 1
I MD: 190071 I TVD: 14192 I 1 Maxlnc: 192 I I KOP: 1300 I I KBE: 1681
1 Well Design (conventional, slim hole, etc.): 1 Conventional Grass Roots ML Producer I /'
Surface Location:
Target Location:
TOP "OA"
Target Location:
BHL "OA" Well TD
Target Location:
TOP "OB"
Target Location:
BHL "OB" Well TO
TOTAL DEPTH
I Objective: 1 Schrader OA Sand
Mud Program:
9-7/8" Surface Hole Mud Properties:
Density (ppg) Funnel visc YP
HTHP
Spud - LSND Freshwater Mud
pH API Filtrate LG
Sol ids
< 6.5
8.6 - 9.20
I
75 - 150
N/A
<8
25 - 60
9.0-9.5
KCL-CaC03 Flow Pro
pH API Fi Itrate LG
Solids
<12
6-1/8" Production Hole Mud Properties:
Density (ppg) Funnel vise YP HTHP
8.6 -9.20 4055 22 - 27 <10 8.0 - 8.5 4 - 6
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU IR.
1
(
Cement Program:
Milne per 'J1PS-05 Well Permit
Casing Size 17.625-in 29.7-lb/ft L-80 BTC Intermediate Casing
B . 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below
aSlS
permafrost
Pump lead to surface before switching to tail. Have additional 300-sx lead cement on location.
Total Cement
Volume: 772-bbl
Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg
50 bbl of Viscosified Spacer (Alpha Design) weighted to 10.50
ppg
966-sx (714-bbl) 10.7Ib/gal Class L - 4.15 cuft/sx (cement to
surface)
285-sx (58-bbl) 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at
4046 '
Spacer
Lead
Tail
Temp BHST ~ 80° F from SOR, BHCT 85° F estimated by Halliburton
Evaluation Program:
9 7/8" Hole Section:
Open Hole:
Cased Hole:
6-1/8" Hole section:
Open Hole:
MWD/GRlRES IFR/CASANDRA
N/a
MWD/GRlRES ABI/IFRlCASANDRA
Formation Markers:
MDrkb
(ft)
Base Permafrost 1,985
Top U gnu 4,224
Top Ugnu M 4,828
Bottom U gnu 4,959
NA 5,058
NB 5,106
NC 5,171
NE 5,208
NF 5,326
Top OA 5,406
Base OA 5,501
Top OB 5,617
TD 6,894
*Based on sub-surface depths.
Formation Tops
TVDßb .
(ft) Pore Pressure (pSI)
1,816 817
3,491 1,570
3,926 1,766
3,999 1,799
4,048 1,821
4,070 1,831
4,097 1,843
4,111 1,849
4,151 1,867
4,176 1,878
4,201 1,890
4,223 1,900
4,238 1,906
2
Estimated EMW
(lb/gal)*
8.65
8.65
8.65
8.65
8.65
8.65
8.65
8.65
8.65
8.65
8.65
8.65
8.65
/
(
Milne Po( \liPS-OS Well Permit
1914 psi @ 4256' TVDrkb - Top of "OB"
1488 psi @ surface
(Based on BHP and a full column of gas from TO @ 0.1 psi/ft)
Diverter will be function tested. BOP's:Test annular 250 psi low
and 2500 psi high, and rams to 250 psi low and 4,000 psi high.
N/A
9.2 ppg NaCI / 6.8 ppg Diesel
Casing/Tubing Program:
Hole Csg /
Size Tbg O.D.
42-in 20-in* 92# H-40 Welded 82-ft
9.875-in 7.625-in 29.7#. L-80 BTC 5,550-ft
WtlFt Grade
Conn
Length
Top
MD / TVDrkb
30-ft
30-ft
6.125-in 4.5-in 12.6# L-80 IBT 3,435-ft 5,580-ft / 4,217-ft
(OB)
6.125-in 4.5-in 12.6# L-80 IBT 3,637-ft 5,370-ft /4,165-ft
(OA)
*The 20" casing is insulated
Recommended Bit Program:
BHA Hole Depth (MD) Bit Type NozzlelFlow
Size rate
1 9.875-in 0 - 2,000- ft Hughes MXC-l 3-15 & 1-10
2 9.875-in 2,000 - 5,580-ft Security Rotary TBD
Steerable Bit
3 6.125-in 5,580-ft - TD Security FM2643 3 -12
Well Control:
. Production hole will be drilled with a diverter.
Surface Interval
. Maximum anticipated BHP:
. Maximum surface pressure:
. Planned BOP test pressure:
.
. Kick tolerance:
. Planned completion fluid:
Drilling Hazards & Contingencies:
Hydrates
Bottom
MD / TVDrkb
112-ft /112-ft
5,580-ft /
4,217 -ft
9,015-ft /
4,246-ft
9,007-ft /
4,192-ft
. Hydrates have not been seen on S pad, but has been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
3
Milne Po~ 'VIPS-OS Well Permit
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
. Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation
. We do not expect losses while drilling this well.
. Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
.
It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud.
Pad Data Sheet
.
Please Read the S-Pad Data Sheet thoroughly.
Breathing
.
N/A
Hydrocarbons
.
Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
. NA
Hydrogen Sulfide
. MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
.
MPS-05L 1 has no anti-collision issues.
4
Milne PO( \liPS-OS Well Permit
DRILL & COMPLETION PROCEDURE
Pre- Rig Operations
1. The 20" insulated conductor is installed
Procedure
1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe
2. Drill 9-7/8" surface hole as per directional plan. Maximum angle 840
3. Condition mud prior to 7 5/8" casing run. POOH
4. Run and cement 7 5/8" casing from TD to surface.
5. ND Diverter
6. Install FMC 11" 5m horizontal wellhead
7. N/U and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250
low and 4000 psi high
8. Drill 6-1/8" OB horizontal production hole as per directional plan.
9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing. ,".'"
10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD. 7~.... ..",..,,r
a. RIH. Orient and set whipstock to place window at top of the OA interval.
b. Shear off and mill window thru 7-5/8" casing.
11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud
properties and POOH.
12. MU whipstock retrieving tool and pull whipstock
13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing
14. POOH
15. TIH and displace out drilling mud with 9.2 ppg N aCl
16. POOH
17. Run in hole with 4-1/2" jet pump completion as per schematic
18. Land tubing hanger and test
19. Set BPV
20. ND BOP
21. Install and test tree
22. Pull BPV
23. Drop ball and set production packer
24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi
25. Freeze protect thru GLM
26. Install BPV and secure the well
27. RD/MO
5
TREË: Cameron 4-1/16" 5M PROPOSED COMPLi:: TION
~~TnL:~:~:~~t?x~~~/~",11'" 5M (. , PS-OS ~P~-05(. .1
FMC Tubing Hanger am
1121 20" 92 Ib/ft, H-40 Welded ... /.. ... 42" Hole
Insulated Diesel Freeze protect 10/ QIIII 4-1/2" X 1" ~"¡; ;~:a~~~~:lo~e~'~~~;t~~ ,2000' TVD,
750' MD
KB. ELEV =67.5'
Cellar Box ELEV = 39.3'
9.2 KCI wtih corrosion r
inhibitor as packer fluid
4-1/2", 12.6 Ib/ft, L-80, IBT-M
Coupling 00: 5.2"
Drift/tO: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7,500, 800/0=6,000 psi
~
"" BIW 1- Wire
Jet Pump Installed in
Sliding Sleeve Post rig!
Ii
III
Phoenix Pressure Gauge (3.850" 10, W/BIW 1- wire down
to lower sensor)
Halliburtion Dura Sleeve XO WIX Nipple (3.813" 10)
Phoenix Pressure Gauge (2.840" 10)
7-5/8" 29.7#, L-80, BTC-M
Casing Drift: 6.75
Casing to: 6.875
Coupling 00: 8.5"
Burst: 6,890 psi
Collapse: 4,790 psi
7-5/8" x 4-1/2" S-3 Packer
I Set @ 5,356' MD, 4161' TVD I
,
A
3-1/2" HES 'XN' nipple 2.750" 10 No Go W/RHC ball & rod
Wireline Entry Guide
Window in 7" casing @ 5,370' MD
Well Inclination @ Window = 72 Degrees
\~
Multi-Lateral Junction 5,3701
6-1/8" OA Lateral TO 9,007' "'-.
6-1/8" OB Lateral TO 9,015'
........
""'-"- -
- -
- -
- -
OA Horizontal 6-1/8" hole
r....... ....... - -
- -
- -
- -
4-1/2" Slotted Liner W/Hookwall hanger
7" Casing Shoe @ 5,580' MD
Welltnclination @ Shoe = 80 Degrees
~ ~
~.;;:::' .~~ 9-7/S"Hole
"
\ -.., - -------
" "....... OB Horizontal 6-1/8" hole
---------
PBTD
TD
4-1/2" Slotted Liner & Hanger
DATE
27 Jun 02
REV. BY
MDG
COMMENTS
Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion
Milne Point Unit
WF~ ~ : MPS-05
API NO:
BP Exploration
Field: Milne Point
Well: MPS~05
DIRECTIONAL
LWD
OPEN HOLE
LOGGING
NONE
NONE
Dir/GRlRES
NONE
('
(
BP EXPLORATION
Milne Point Unit MPS-05 & MPS-05 L 1
FORMATION
DEPTH
MD I TVD TOC
112'
112'
Top of Lead Cement
Surf Surf
- - Dir/Res. . - . . - . . - . . - . . - . . - . . - .. -.. - . . - . -. -
ABI/GR NONE OAsand 5,370' 4,165'
9,007' 4,192'
- -.. -.. -.. -.. -.. -... -.. -.. -... -..- .. -. -.-
Base of Permafrost
1,933' 1,822'
ENG: Steve Campbell I Matthew Green
RIG: Doyon 141
MSL 39.3~ft
RKB: 68'
HOLE CASING MUD INFO
TOC SIZE SPECS PIT INFO INFORMATION
Wellhead
20" 91.5# FMC Gen 6 20" x 11" 5M
H-40 Insulated N/A
42" Welded
I~
~~~I
~~~¡
I 'I~
tll'!li
slliiil
,.11,'1
I'~'.I'~.'....~....
. '~i~~'
¡Jili!¡'1
I"'.. .i~.',¡1
n
1,~¡1
Ifæ
M~
¡.I~.'~,~
iì¡
t'¡\
I~I
¡~I~
J1~1
,~
Ilil
~~!I
1¡II~il
.".~..u.:.¡.'..'..'
,~~1
¡!II.I~ìi
~
'--
,-'
'....
.. .. - .-
--Öir/Res--..-..-..- .---.-..-.. -..-...-.-.-
ABI/GR NONE OB sand 5,580' 4,217'
9,015' 4,246'
- - . . - . . - . . - . . - . . ... . . - . . - . . - . ,8 -.. - . . - . '. - . . - . .
6/28/2002
Top ofTai! Cement
4,558'
Top of N sand
5,058' 4,048'
7-5/8" Surface casing 5,580' 4,217'
~
"-
KOP @ 300' MD
EOB @ 2461' MD
6-1/8" Hole - 4-1/2",12.6#, L-BO Slotted Liner
9-7/8"
Surface
Casing
75/8" 29.733#
L-BO
BTC
MW = 9.2
6-1/8" Hole - 4-1/2",12.6#, L-BO Slotted Liner
MPS-05ML WBD.xls
=-
~
0
0
~
:;; 4000
is..
Ö
'ã
'E
Q>
:>
Q>
2
r-<
bp
REFERENCE INFORMATION
COMPANY DETAILS
BP Amoco
Calculation Method: Minimum Curllature
Error System: ISCWSA
Scan Method: Trav Cylinder North
Error Surface: Elliptical + Casing
Warning Method: Rules Based
Co-ordinate (NIB) Reference: Wen Centre: Piau MPS-05. True North
Vertical (fVD) Reference: S-pad D-14166.40
Section (VS) Reference: Slot - (O.OON,O.OOE)
Measured Depth Reference: S-pad D-141 66.40
Calculation Method: Minimum Curllature
SURVEY PROGRAM
Plan: MPS-05LI (OA) wpOI (Plan MPS-05/Plan MPS-05L1 (OA»
Depth Fm Depth To Smvey/Plan
5370.00 9006.77 Planned: MPS-Q5Ll(OA) wpOl V2
Tool
Created By: Ken Allen
Checked:
Date:
Date:
Date: 6/24/2002
MWD+IFR+MS
Reviewed:
FORMATION TOP DETAILS
WEll-DETAILS
Name +N/-S +F1-W Northing Basting Latitude Longitude Slot
PIau MPS-05 54.49 -325.71 6000029.59 566018.85 70024'37.864N 149°27'44.718W N/A
TARGET DETAILS
Name TVD +N/-S +F1-W Northing Basting Shape
MPS-05L2 gee 4167.40 -2828.38 -405.90 5997198.00 565638.00 Polygon
MPS-05 OAI 4172.40 -599.53 1342.03 5999442.00 567366.00 Point
MPS-05 OA2 4191.40 -1125.27 965.33 5998913.00 566994.00 Point
MPS-05 OAJ 4192.40 -2724.22 -195.95 5997304.00 565847.00 Point
SECTION DETAILS
See MD Ine Azi TVD +N/-S +E/-W DLeg TFaee VSee Target
1 5370.00 71.66 180.00 4165.28 381.07 1554.88 ~gg 0.00 -491.64
2 5557.83 92.03 189;81 4191.86 197.06 1538.68 26.37 -306.95
3 6014.06 92.03 189.81 4175.73 -252.21 1461.00 0.00 0.00 146.74
4 6382.79 89.00 208.00 4172.40 -599.53 1342.03 5.00 99.28 501.70 MPS-05 OA 1
5 6618.81 88.06 217.40 4178.46 -797.86 1214.72 4.00 95.81 708.65 ~
6 6971.32 88.06 217.40 4190.38 -1077.75 1000.75 0.00 0.00 1003.18
7 7030.60 89.97 215.99 4191.40 -1125.27 965.33 4.00 -36.41 1053.12 MPS-05 OA2
8 9006.77 89.97 215.99 4192.40 -2724.22 -195.95 0.00 0.00 2731.26 MPS-05 OA3
No. TVDPath MDPath Formation
3600-
4167.40 5376.86 TSBD-OA
ø
,#
'ë>
~ "
~
~
"/~
"/~
,
,
"
~~
~
Start Dir 121100': 5370' MD, 4165.28'TVD
I End Dir : 5557.83' M), 491.86' TVD
/ Star: Dir 5/100' 604.06'~D,417j.73'TVJ
¡,/ !o ~. I
\ 53~ ~ hoon j 6500 !
. "'0 f /
TSfD-OA ,Start DL-4t 00': 6382.79' MD. 4172.4'V'D
End Dir : 6618.81 MD, 4: 78.46'':VD
a
ao
4400
-400
0
400
800
CASING DETAILS
No. TVD
MD
Name
Size
4192.40 9006.76 4 1/2"
4.500
All TVD depths are
ssTVD plus 66.4'for RKBE.
~
Start IJtrNlo(': 6"97U;¡'MIJ, 41~o.3.ln'VJJ
/ Eoc '" ,10". MD, 4191.4' IÝ ,
,001 7500
0
:s-
8001)
Total Depth: 9O( 6.77' MD, ,q 91:4'-:YD
8500 ~ocl, 4/].'
1200 1600
Vertical Section at 184.110 [400ft/in]
2000
2400
2800
I
3200
ö
:s
~
0
0
t:.
+'
:='
t
0
t
1
00
-1400
-2100
-2800
COMPANY DETAILS
REFERENCE INFORMATION
BP Amoco
Calculation Method: Minimum Cutvature
Error System: ISCWSA
Scan Method: Trav Cylinder North
Error Surface: Elliptical + Casing
WarniJIg Method: Rules Based
Co-ordinale (NIE) Reference: Well Cenlre: Plan MPS-05, True North
Vertical (fVD) Reference: S-pad D-141 66.40
Section (VS) Reference: Slol - (O.OON,O.OOE)
Measured Depth Reference: S-pad D-141 66.40
Calculation Method: Minimum Cutvature
1400-
700-
SURVEY PROGRAM
Depth Fm Depth To SurveylPJan
Tool
Plan: MPS-05LI(OA) wpOI (Plan MPS-05/Plan MPS-05LI (OA))
Crealed By: Ken Allen Dale: 6/24/2002
5370.00 9006.77 Planned: MPS-05Ll(OA) wpOl V2
MWD+IFR+MS
Checked:
Date:-
Date:-
Reviewed:
WELL DETAILS
Name
+N/-S +FJ-W Northing
54.49 -325.71 600002959
Hasting Latitude Longitude Slot
566018.85 70'24'37.864N 149'27'44.7I8W N/A
Plan MPS-05
TARGET DETAILS
Name TVD +N/-S +FJ-W Northing
MPS-05L2 geo 4167.40 -282838 -405.90 5997198.00
MPS-050AI 4172.40 -59953 1342.03 5999442.00
MPS-050A2 4191.40 -1125.27 965.33 5998913.00
MPS-050A3 4192.40 -2724.22 -195.95 5997304.00
Hasting Shape
565638.00 Polygon
567366.00 Point
566994.00 Point
565847.00 Point
SECTION DETAILS
See MD Ine Azi TVD +N/-S +E/-W DLeg TFaee VSee Target
1 5370.00 71.66 180.00 4165.28 381.07 1554.88 0.00 0.00 -491.64
2 5557.83 92.03 189.81 4191.86 197.06 1538.68 12.00 26.37 -306.95
418' ~ 3 6014.06 92.03 189.81 4175.73 -252.21 1461.00 0.00 0.00 146.74
4 6382.79 89.00 208.00 4172.40 -599.53 1342.03 5.00 99.28 501.70 MPS-05 OAl~
Start Dir 12/100' : 5370' MD, 4165.28'TVD 5 6618.81 88.06 217.40 4178.46 -797.86 1214.72 4.00 95.81 708.65
6 6971.32 88.06 217.40 4190.38 -1077.75 1000.75 0.00 0.00 1003.18
7 7030.60 89.97 215.99 4191.40 -1125.27 965.33 4.00 -36.41 1053.12 MPS-05 OA2
8 9006.77 89.97 215.99 4192.40 -2724.22 -195.95 0.00 0.00 2731.26 MPS-05 OA3
0
WPS.050Al
-700
8tart Dir4/100': 6382.79' MD, 4172.4'TVD
":.n( Dit : 6618.81' MD, 4178.46' TVD
Stan Di, 4/100' : -6971.32' MD, 4190.38'TVD
End Dir : 70~0.6' MD, 4191.4' TVD
All TVD depths are
ssTVD plus 66.4'for RKBE.
I I I I I
~
\
'\ '::'otð... D('ptl1: 9CQG.:7' ~m, 41nA' TV=>
MP8,05T .1 (OA) wp( 1
0
I
2100
I
2800
700
1400
West(-)Æast(+) [700ft/in]
CASING DETAILS
FORMATION TOP DETAILS
No. TVD
MD
Size
No. TVDPath MDPath Fonnation
Name
4192.40 9006.76 4 1/2"
4167.40 5376.86 TSBD-OA
4.500
~
tI
.I
,tI
I
I
,/
,
~
~ ,..ç: - ---.-;
I -~ ---
~ ~
"J'~ ..J'I
'Y~ /'
#, ~
, AJ '"'
'V"~,
BP
My Planning Report MAP
BP Amoco
Mßne Point
M PtS Pad
PlanMPS-05
PJan MPs.Q5L 1 (OA)
Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Company:
Field:
Site:
Well:
WeUpatb:
Field:
»ate:6I2412OO2 . TIme:,1{):01:49 Page:
Co-ontinate(NE}Referenœ: . Well: pran MPS-05, True North
VemeaJ(TVD)Refer~ee:. S-padQ..14166.4. .
Seetion{VS}RefereDee: . . WeU(O.00N,Q.OOE,184.11Azj}
SuneyCakulatiOlÌMethOtt: Mii1imurri Curvature Db: Oracle
Map Zone:
Coordinate System:
Geomagnetic Model:
Site:
M Pt S Pad
Site Position:
From: Map
Position Uncertainty:
Ground Level:
Northing: 5999978.00 ft Latitude:
Easting: 566345.00 ft Longitude:
North Reference:
Grid Convergence:
0.00 ft
0.00 ft
Well:
Plan MPS-05
Slot Name:
+N/-S 54.49 ft Northing: 6000029.59 ft Latitude:
+E/-W -325.71 ft Easting: 566018.85 ft Longitude:
Position Uncertainty: 0.00 ft
Well Position:
Wellpath: Plan MPS-05L 1 (OA)
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Plan:
S-pad D-141
6/21/2002
57498 nT
Depth From (TVD)
ft
0.00
MPS-05L 1 (OA) wp01
Date Composed:
Version:
Tied-to:
Height 66.40 ft
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
+N/-S
ft
0.00
Principal: Yes
Casing Points
Alaska, Zone 4
Well Centre
BGGM2002
70 24 37.329 N
149 27 35.171 W
True
0.51 deg
70 24 37.864 N
149 27 44.718 W
Plan MPS-05 (OB)
5370.00 ft
Mean Sea Level
25.84 deg
80.80 deg
Direction
deg
184.11
6/21/2002
2
From: Definitive Path
41/2"
Formations
0.00 BPRF 0.00 0.00
0.00 TUgnu 0.00 0.00
0.00 BUgnu 0.00 0.00
0.00 SBF2-NA 0.00 0.00
0.00 SBF1-NB 0.00 0.00
0.00 SBE4-NC 0.00 0.00
0.00 SBE2-NE 0.00 0.00
0.00 SBE1-NF 0.00 0.00
5376.86 4167.40 TSBD-OA 0.00 0.00
0.00 TSBC 0.00 0.00
0.00 TSBB-OB 0.00 0.00
0.00 SBA5 (base OB) 0.00 0.00
0.00 Top OBd 0.00 0.00
0.00 Base OBd 0.00 0.00
Targets
MPS-05L2 geo
.polygon1
-Polygon 2
4167.40 -2828.38 -405.90 5997198.00 565638.00 70 24 10.048 N 149 27 56.610 W
4167.40 -2828.38 -405.90 5997198.00 565638.00 70 24 10.048 N 149 27 56.610 W
4167.40 -2832.00 3.12 5997198.00 566047.00 70 24 10.012 N 149 2744.626 W
BP
My Planning Report MAP
(
Company: B~Amoco
Field: . Miine Point
Site: MPt$ Rad
WeD: Plan MPS-05
WeUpath: Plan MPs...osL 1 (OA)
Date: 6/2412002 . Time: 10:01 :49 Page:
CHriliute(NE}Referüee:.. .WeH:PlanMPS-05, True North
VemeaJ(TVD)°Reference: 0. S-pad~14166.4 .
Seçtion(VS)Reference:Welf(0.OON,0.0QE,184.11Azi)
SUJ'VeYCalculatiØn Mettied:. Minimum Curvature Db: Oracle
2
Targets
Map MaP <-- Latitude --> <- Longitude -->
Name Description TVD +Ni..s +E/-W .NorthiDg Easting Deg Min . See Deg. Min See
Dip. Dir. ft. it ft ft ft
-Polygon 3 4167.40 -687.66 1468.27 5999355.00 567493.00 70 24 31.100 N 149 27 1.685 W
-Polygon 4 4167.40 185.32 1710.02 6000230.00 567727.00 70 24 39.685 N 149 26 54.594 W
-Polygon 5 4167.40 189.10 1283.00 6000230.00 567300.00 70 24 39.723 N 149 27 7.111 W
-Polygon 6 4167.40 -476.37 1212.11 5999564.00 567235.00 70 24 33.178 N 149 27 9.192 W
MPS-050A1 4172.40 -599.53 1342.03 5999442.00 567366.00 70 24 31.967 N 149 27 5.385 W
MPS-05 0A2 4191.40 -1125.27 965.33 5998913.00 566994.00 70 24 26.797 N 149 27 16.427 W
MPS-05 OA3 4192.40 -2724.22 -195.95 5997304.00 565847.00 70 24 11.072 N 149 27 50.459 W
Plan Section Information
MD..
ft. .
5370.00
5557.83
6014.06
6382.79
6618.81
6971.32
7030.60
9006.77
.Iöêl .
.'d~.
71.66
92.03
92.03
89.00
88.06
88.06
89.97
89.97
'AZlm
(i~Q.. "
180.00
189.81
189.81
208.00
217.40
217.40
215.99
215.99
.~..
.. ..ft. ..
4165.28
4191.86
4175.73
4172.40
4178.46
4190.38
4191.40
4192.40
+Nt..S 'f$I;.,W -: .
.'>:.'tt..:.>:'- ..',..~f";,":.: ...
381.07 1554.88
197.06 1538.68
-252.21 1461.00
-599.53 1342.03
-797.86 1214.72
-1077.75 1000.75
-1125.27 965.33
-2724.22 -195.95
.""~~:'::' ~.JìilCl: :..'1jijtïl . .' .
. . ~1AØft.'~~l10Off,t1~f1:00ft. '
0.00 0.00 0.00
12.00 10.84 5.22
0.00 0.00 0.00
5.00 -0.82 4.93
4.00 -0.40 3.98
0.00 0.00 0.00
4.00 3.22 -2.37
0.00 0.00 0.00
. :TFO ..t~tg~t.
d$9, ..
0.00
26.37
0.00
99.28 MPS-050A1
95.81
0.00
-36.41 MPS-050A2
0.00 MPS-05 OA3
Survey
5370.00 71.66 180.00 4165.28 4098.88 6000424.35 567570.16 -491.64 0.00 Start Dir 12/100' : 5370' MD,
5375.00 72.20 180.28 4166.83 4100.43 6000419.60 567570.19 -486.90 12.00 MWQ+IFR+MS
5376.86 72.40 180.38 4167.40 4101.00 6000417.82 567570.19 -485.13 12.00 MPS-05L2 geo
5400.00 74.89 181.66 4173.91 4107.51 6000395.63 567569.99 -462.96 12.00 MWD+IFR+MS
5425.00 77.59 183.00 4179.86 4113.46 6000371.36 567569.22 -438.70 12.00 MWD+IFR+MS
5450.00 80.30 184.31 4184.65 4118.25 6000346.87 567567.87 -414.16 12.00 MWD+IFR+MS
5475.00 83.02 185.60 4188.28 4121.88 6000322.21 567565.95 -389.43 12.00 MWD+IFR+MS
5500.00 85.73 186.88 4190.73 4124.33 6000297.46 567563.47 -364.57 12.00 MWD+IFR+MS
5525.00 88.45 188.15 4192.00 4125.60 6000272.69 567560.42 -339.65 12.00 MWD+IFR+MS
5550.00 91.17 189.41 4192.08 4125.68 6000247.95 567556.82 -314.74 12.00 MWD+IFR+MS
5557.83 92.03 189.81 4191.86 4125.46 6000240.22 567555.58 -306.95 12.00 End Dir : 5557.83' MD, 4191.8
5600.00 .92.03 189.81 4190.37 4123.97 6000198.64 567548.77 -265.01 0.00 MWD+IFR+MS
5700.00 92.03 189.81 4186.83 4120.43 6000100.03 567532.62 -165.57 0.00 MWD+IFR+MS
5800.00 92.03 189.81 4183.30 4116.90 6000001.41 567516.46 -66.12 0.00 MWD+IFR+MS
5900.00 92.03 189.81 4179.76 4113.36 5999902.80 567500.31 33.32 0.00 MWD+IFR+MS
6000.00 92.03 189.81 4176.23 4109.83 5999804.19 567484.15 132.76 0.00 MWD+IFR+MS
6014.06 92.03 189.81 4175.73 4109.33 5999790.33 567481.88 146.74 0.00 Start Dir 5/100' : 6014.06' MD
6100.00 91.33 194.05 4173.21 4106.81 5999706.15 567464.87 231.83 5.00 MWD+IFR+MS
6200.00 90.51 198.99 4171.61 4105.21 5999610.08 567437.30 329.45 5.00 MWD+IFR+MS
6300.00 89.68 203.92 4171.45 4105.05 5999516.73 567401.57 424.88 5.00 MWD+IFR+MS
6382.79 89.00 208.00 4172.40 4106.00 5999442.00 567366.00 501.70 5.00 MPS-050A1
6400.00 88.93 208.69 4172.71 4106.31 5999426.79 567357.97 517.39 4.00 MWD+IFR+MS
6500.00 88.53 212.67 4174.93 4108.53 5999340.38 567307.74 606.80 4.00 MWD+IFR+MS
6600.00 88.14 216.65 4177.84 4111.44 5999257.68 567251.64 692.87 4.00 MWD+IFR+MS
6618.81 88.06 217.40 4178.46 4112.06 5999242.58 567240.46 708.65 4.00 End Dir : 6618.81' MD, 4178.4
6700.00 88.06 217.40 4181.21 4114.81 5999177.68 567191.75 776.49 0.00 MWD+IFR+MS
6800.00 88.06 217.40 4184.59 4118.19 5999097.76 567131.76 860.04 0.00 MWD+IFR+MS
6900.00 88.06 217.40 4187.97 4121.57 5999017.83 567071.77 943.59 0.00 MWD+IFR+MS
6971.32 88.06 217.40 4190.38 4123.98 5998960.83 567028.99 1003.18 0.00 Start Dir 4/100' : 6971.32' MD
BP (
My Planning Report MAP
Company: BP Amoco Date: . . .6l24I2OO.2 Time: 10:01:49 Page: 3
Field: Milne Point Co-ordilutte(NE} Referenee: Well: Plan MPS-05, True North
Site: MPt S Pad Vertic8l{TVD)~erenee: S-pad 0-14166.4
Well: Plan MPS-05 . Seetio1t (VS)RefereDce: Well (O.OON,O.OOE,184.11Azi)
WeUpatb: Plan MPS-05L 1 (OA) SurveyCalculationMetbod: Minimum Curvature Db: Oracle
Survey
I MD loel Azim. TVD SysTVD MapN MapE VS DLS TooVComment
ft deg deg ft ft ft ft ft degl100ft
7000.00 88.99 216.72 4191.12 4124.72 5998937.80 567011.92 1027.23 4.00 MWD+IFR+MS
7030.60 89.97 215.99 4191.40 4125.00 5998913.00 566994.00 1053.12 4.00 MPS-05 0A2
7100.00 89.97 215.99 4191.44 4125.04 5998856.49 566953.72 1112.05 0.00 MWD+IFR+MS
7200.00 89.97 215.99 4191.49 4125.09 5998775.07 566895.68 1196.97 0.00 MWD+IFR+MS
7300.00 89.97 215.99 4191.54 4125.14 5998693.65 566837.64 1281.89 0.00 MWD+IFR+MS
7400.00 89.97 215.99 4191.59 4125.19 5998612.23 566779.59 1366.81 0.00 MWD+IFR+MS
7500.00 89.97 215.99 4191.64 4125.24 5998530.81 566721.55 1451.73 0.00 MWD+IFR+MS
7600.00 89.97 215.99 4191.69 4125.29 5998449.39 566663.51 1536.65 0.00 MWD+IFR+MS
7700.00 89.97 215.99 4191.74 4125.34 5998367.97 566605.47 1621.57 0.00 MWD+IFR+MS
7800.00 89.97 215.99 4191.79 4125.39 5998286.55 566547.43 1706.48 0.00 MWD+IFR+MS
7900.00 89.97 215.99 4191.84 4125.44 5998205.13 566489.39 1791.40 0.00 MWD+IFR+MS
8000.00 89.97 215.99 4191.89 4125.49 5998123.71 566431.34 1876.32 0.00 MWD+IFR+MS
8100.00 89.97 215.99 4191.94 4125.54 5998042.29 566373.30 1961.24 0.00 MWD+IFR+MS
8200.00 89.97 215.99 4191.99 4125.59 5997960.87 566315.26 2046.16 0.00 MWD+IFR+MS
8300.00 89.97 215.99 4192.04 4125.64 5997879.45 566257.22 2131.08 0.00 MWD+IFR+MS
8400.00 89.97 215.99 4192.09 4125.69 5997798.03 566199.18 2216.00 0.00 MWD+IFR+MS
8500.00 89.97 215.99 4192.14 4125.74 5997716.61 566141.14 2300.92 0.00 MWD+IFR+MS
8600.00 89.97 215.99 4192.19 4125.79 5997635.19 566083.09 2385.84 0.00 MWD+IFR+MS
8700.00 89.97 215.99 4192.24 4125.84 5997553.77 566025.05 2470.76 0.00 MWD+IFR+MS
8800.00 89.97 215.99 4192.30 4125.90 5997472.35 565967.01 2555.68 0.00 MWD+IFR+MS
8900.00 89.97 215.99 4192.35 4125.95 5997390.93 565908.97 2640.60 0.00 MWD+IFR+MS
9006.76 89.97 215.99 4192.40 4126.00 5997304.01 565847.00 2731.26 0.00 MPS-05 OA3
9006.75 89.97 215.99 4192.40 4126.00 5997304.01 565847.01 2731.25 0.00 Total Depth: 9006.77' MD, 419
9006.77 89.97 215.99 4192.40 4126.00 5997304.00 565847.00 2731.26 0.00 MWD+IFR+MS
CHECK 1
STANDARD LETTER
DEVELOPMENT
DEVELOPMENT
REDRILL
EXPLORATION
INJECTION WELL
INJECTION WELL
REDRILL .
Rev: 5/6/02
C\jody\templates
; y
('
TRANSMITAL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME ~?S - O,Ç¿. /
CHECK WHAT APPLIES
ADD-ONS (OPTIONS) "CLUE"
MUL TI LATERAL The permit is for a new wellbore segment of existing well
fiP$ - 0 S 1b../I¡fI2-O'?-..L3J-, p~ 1\.;8, API No. ~d -oZ.7- .2 3.1óc
(If API number last two (2) Production should continue to be reported as a function of
digits are between 60-69) the original API number stated above.
x
PILOT HOLE (PH)
In accordance with 20 AAC 25.005(1), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
ANNULAR DISPOSAL Please note that an disposal of fluids generated. . .
INTO ANNULUS OF
ANOTHER WELL ON
SAME PAD
L-)
SPACING EXCEPTION
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Comnanv Name) will assume the liability of any protest to
the spacing exception that may occur.
.WELL PERMIT CHECKLIST COMPANY />P X WELL NAME ß/JS -0 ç t.. J
FIELD & POOL 52 ç /7In INIT CLASS Ó¿¿./ /-¿:J~í
ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . .
2. Lease number appropriate. . . . . . . . . . . . . . . . . . .
3. Unique well name and number. .. . . . . . . . . . . . . . . .
4. Well located in a defined pool.. . . . . . . . . . . . . . . . .
5. Well located proper distance from drilling unit boundary. . . .
6. Well located proper distance from other wells.. . . . . . . . .
7. Sufficient acreage available in drilling unit.. . . . . . . . . . .
8. If deviated, is well bore plat included.. . . . . . . . . . . . . .
9. Operator only affected party.. . . . . . . . . . . . . . . . . .
10. Operator has appropriate bond in force. . . . . . . . . . . . .
11. Permit can be issued without conservation order. . . . . . . .
~þR p~ T~ 12. Permit can be issued without administrative approval.. . . . .
/(?~ 7///02- 13. Can permit be approved before 15-day wait.. . . . . . . . . .
ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . .
15. Surface casing protects all known USDWs. . . . . . .
16. CMT vol adequate to circulate on conductor & surf csg. . . . .
17. CMT vol adequate to. tie-in long string to surf cs.g. . . . . . . .
18. CMT will cover all known productive horizons. . . . . . . . . .
19. Casing designs adequate for C, T, B & permafrost. . . . . ..
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . .
21. If a re-drill,.has a 10-403 for abandonment been approved. . .
22. Adequate wellbore separation proposed.. . . . . . . . . .-. .
23. If diverter required, does it meet regulations. . . . . . . . . .
24, Drilling fluid program schematic & equip list adequate. . . . .
25. BOPEs, do they meet regulation. .. . . . . . . . . . . . . .
APPR DA TF 26. BOPE press rating appropriate; test to lfOO CJ psig.
\AlGA- 1/1{() Z- 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . .
28. Work will occur without operation shutdown. . . . . . . . . . .
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . .
30. Permit can be issued w/o hydrogen sulfide measures. . . . .
31. Data presented on potential overpressure zones. . . . . . .
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . .
~.tfR 'p~Tj 33. Seabed condition survey (if off-shore). . . . . . . . . . . . .
/Vrr ?/j'/S7' 34. Contact name/phone for weekly progress reports [exploratory Q
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a. suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface;
(C) will not impair mechanical integrity of the well used for disposal. Y N
(D) will not damage producing formation or impair recovery fro Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION:
RPç¡(jf-. JDH~
WGA tN6¡t-
GEOLOGY
APPR DATE
* 7//ÞZ-
PROGRAM: Exp - Dev)L Redrll - Se~ - Wellbore seg X Ann. disposal para req - .
GEOLAREA ?9t'\ UNIT# //3.? ~ ON/OFF SHORE GYÙ
r-¡
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
&N
~~ Ai//r
.~
~
6t?N
G? ~ P4~ 1£//.
~N pJlA-
i ~N<t- .~. t" P
,,,1- ~ / '-I ¡'.-8- P t./ .
f~
Y~
@N
Y N
Y
/U,A
/LJ. A,
COT.
DTS D 7/ o¥o <~"
G:\geology\permits\checklist.doc
)
)
Commentsllnstructions:
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplrty finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special.effort has been made to chronologically
organize this category of information.
~Od-J3'6
I / 33 5
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon Nov 25 15:33:51 2002
Reel Header
Service name. . . . . . . . . . . . .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 /11/25
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number.. ....01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS
Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Da te. . . . . . . . . . . . . . . . . . . . . 02/11/25
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.............. ..UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments.............. ...STS LIS Writing
Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD /MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-05 L1
500292310060
BP Exploration (Alaska)
Sperry-Sun Drilling Services
25-NOV-02
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 1
AK-MW-22118
J. STRAHAN
C. DIXON
MWDRUN 2
AK-MW-22118
J. STRAHAN
C. DIXON
MWDRUN 3
AK-MW-22118
J. STRAHAN
C. DIXON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 6
AK-MW-22118
J. STRAHAN
L. BROWN
MWDRUN 7
AK-MW-22118
J. STRAHAN
L. BROWN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
7
12N
11E
3360
4772
66.80
39.30
(
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.875 20.000 112.0
6.125 7.625 5111.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1-3, and 7 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4).
4. MWD RUN 6 WAS DIRECTIONAL ONLY, TO ORIENT A
WHIPSTOCK IN THE MPS-05
WELLBORE. THE TOP OF THE WHIPSTOCK WAS POSITIONED AT
5111'MD/4112'TVD,
THE EXIT POINT WAS AT ABOUT 5123'MD/5116'TVD. LOG
DATA OVER THIS
INTERVAL WERE ACQUIRED AT THE START OF MWD RUN 7.
5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 8/29/02. MWD DATA
ARE CONSIDERED
PDC.
6. MWD RUNS 1-3, AND 7 REPRESENT WELL MPS-05 Ll WITH
API#: 50-029-23100-60.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
8745'MD/4037'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name... ......... .STSLIB.OOl
Service Sub Level Name. . .
Version Number...... .... .1.0.0
Date of Generation...... .02/11/25
Maximum Physical Record. .65535
File Type.. ... ... ....... .LO
Previous File Name.. .... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
60.0
70.0
70.0
70.0
70.0
70.0
110.5
STOP DEPTH
8691.0
8698.0
8698.0
8698.0
8698.0
8698.0
8745.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
. --------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 60.0 2462.0
MWD 2 2462.0 2594.0
MWD 3 2594.0 5111.0
MWD 6 5111.0 5143.5
MWD 7 5143.5 8745.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type. ....... ........ ..0
Data Specification Block Type.....O
Logging Direction.. .............. . Down
Optical log depth units......... ..Feet
Data Reference Point.... ......... . Undefined
Frame Spacing..... ..... ... ....... .60 .1IN
Max frames per record. ....... ... ..Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specific~tion Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 60 8745 4402.5 17371 60 8745
ROP MWD FT/H 0.03 1297.46 241.876 17270 110.5 8745
GR MWD API 11.73 128.66 72.7931 17263 60 8691
RPX MWD OHMM 0.06 2000 48.6747 17257 70 8698
(
RPS MWD OHMM 0.06 2000 59.356 17257 70 8698
RPM MWD OHMM 0.06 2000 76.339 17257 70 8698
RPD MWD OHMM 0.04 2000 230.253 17257 70 8698
FET MWD HOUR 0.04 186.28 0.574056 17257 70 8698
First Reading For Entire File........ ..60
Last Reading For Entire File........ ...8745
File Trailer
Service name........... ..STSLIB.001
Service Sub Level Name. . .
Version Number..... ... ...1.0.0
Date of Generation...... .02/11/25
Maximum Physical Record. .65535
File Type...... ........ ..LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name... ......... .STSLIB.002
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .02/11/25
Maximum Physical Record. .65535
File Type......... ...... .LO
Previous File Name. ..... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPS
RPX
RPM
RPD
FET
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
60.0
70.0
70.0
70.0
70.0
70.0
110.5
STOP DEPTH
2411.5
2421.5
2421.5
2421.5
2421.5
2421.5
2462.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
12-JUL-02
Insite
66.37
Memory
2462.0
112.0
2462.0
.3
46.3
#
(
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER1S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... .... ..........0
Data Specification Block Type.. ...0
Logging Direction...... ......... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing..................... 60 .1IN
Max frames per record............ . Undefined
Absent value...... ............... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
(
TOOL NUMBER
155789
136749
9.875
112.0
Spud Mud
8.90
217.0
8.0
1000
15.0
2.900
2.430
2.100
4.200
66.0
80.0
66.0
66.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
RPX MWD010 OHMM 4 1 68 12 4
RPS MWD010 OHMM 4 1 68 16 5
RPM MWD010 OHMM 4 1 68 20 6
RPD MWD010 OHMM 4 1 68 24 7
FET MWD010 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 60 2462 1261 4805 60 2462
ROP MWD010 FT/H 2.76 1297.46 236.359 4704 110.5 2462
GR MWD010 API 17.6 126.49 64.7016 4704 60 2411.5
RPX MWD010 OHMM 0.06 2000 122.545 4704 70 2421.5
RPS MWD010 OHMM 0.06 2000 154.327 4704 70 2421.5
(
RPM MWD010 OHMM 0.06 2000 211.871 4704 70 2421.5
RPD MWD010 OHMM 0.04 2000 772.566 4704 70 2421.5
FET MWD010 HOUR 0.05 1.8 0.362358 4704 70 2421.5
First Reading For Entire File......... .60
Last Reading For Entire File......... ..2462
File Trailer
Service name......... ... .STSLIB.002
Service Sub Level Name. . .
Version Number......... ..1.0.0
Date of Generation...... .02/11/25
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/25
Maximum Physical Record..65535
File Type.. ............. .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
FET
RPD
RPM
RPS
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
2412.0
2422.0
2422.0
2422.0
2422.0
2422.0
2462.5
STOP DEPTH
2559.0
2552.0
2552.0
2552.0
2552.0
2552.0
2594.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
13-JUL-02
Insite
66.37
Memory
2594.0
2462.0
2594.0
45.0
46.3
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
. MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............... ...0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units..... ..... .Feet
Data Reference Point...... ...... ..Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value................... ...-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
(
TOOL NUMBER
124724
151812
9.875
112.0
Spud Mud
9.00
101.0
9.8
500
10.0
2.900
2.760
2.100
4.200
66.0
69.8
66.0
66.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2412 2594 2503 365 2412 2594
ROP MWD020 FT/H 4.78 749.41 276.069 264 2462.5 2594
GR MWD020 API 27.43 81.88 46.6262 295 2412 2559
RPX MWD020 OHMM 11.26 77.84 22.2593 261 2422 2552
RPS MWD020 OHMM 10.57 50.46 20.3559 261 2422 2552
RPM MWD020 OHMM 10.66 37.05 19.8074 261 2422 2552
(
RPD MWD020 OHMM 11.44 33.42 20.0538 261 2422 2552
FET MWD020 HOUR 0.17 9.71 3.38571 261 2422 2552
First Reading For Entire File. ..... ... .2412
Last Reading For Entire File.......... .2594
File Trailer
Service name......... ....STSLIB.003
Service Sub Level Name. . .
Version Number... ...... ..1.0.0
Date of Generation..... ..02/11/25
Maximum Physical Record. .65535
File Type...... ...... ....LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name..... ....... .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/25
Maximum Physical.Record..65535
File Type..... ......... ..LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
RPS
RPM
FET
RPD
GR
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
2552.5
2552.5
2552.5
2552.5
2552.5
2559.5
2594.5
STOP DEPTH
5111.0
5111.0
5111.0
5111.0
5111.0
5111.0
5110.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
14-JUL-02
Insite
66.37
Memory
5111.0
2594.0
5111.0
28.4
84.6
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
("
DGR
EWR4
$
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type... ... .......... ..0
Data Specification Block Type.. ...0
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.. .... .............. .60 .1IN
Max frames per record. ........... . Undefined
Absen t value.. . . . . . . . . . . . . . . . . . . . . - 999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
(
155789
136749
9.875
112.0
Spud Mud
9.20
108.0
8.0
300
9.4
4.500
3.450
5.200
4.000
74.0
98.6
74.0
74.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2552.5 5111 3831.75 5118 2552.5 5111
ROP MWD030 FT/H 6.62 1244.34 2.98.008 5033 2594.5 5110.5
GR MWD030 API 11.73 123.13 66.9901 5104 2559.5 5111
RPX MWD030 OHMM 3.44 242.85 17.9808 5118 2552.5 5111
RPS MWD030 OHMM 3.26 347.94 18.6417 5118 2552.5 5111
RPM MWD030 OHMM 3.57 463.05 19.4391 5118 2552.5 5111
RPD MWD030 OHMM 3.57 450.63 20.2141 5118 2552.5 5111
(
FET MWD030 HOUR
0.04
7.24
First Reading For Entire File. ........ .2552.5
Last Reading For Entire File.......... .5111
File Trailer
Service name.......... ...STSLIB.004
Service Sub Level Name. . .
Version Number.. ..... ... .1.0.0
Date of Generation. ..... .02/11/25
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name........... ..STSLIB.005
Service Sub Level Name. . .
Version Number. ......... .1.0.0
Date of Generation...... .02/11/25
Maximum Physical Record. .65535
File Type............ ....LO
Previous File Name... ... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
ROP 5111.0
$
5
0.538429 5118
2552.5
5111
header data for each bit run in separate files.
6
.5000
STOP DEPTH
5143.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
22-JUL-02
Insite
66.37
Memory
5143.0
5111.0
5143.0
.0
.0
TOOL NUMBER
151107
156401
6.750
5111.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type...... ...... ......0
Data Specification Block Type.....O
Logging Direction...... ... ... .... . Down
Optical log depth units.......... .Feet
Data Reference Point........... ...Undefined
Frame Spacing..................... 60 .1IN
Max frames per record. ...... ..... . Undefined
Absent value......... ....... ..... .-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Flo Pro
9.20
53.0
8.7
25500
5.2
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
Name Service Unit
DEPT FT
ROP MWD060 FT/H
Min
5111
0.03
Max
5143.5
27.86
First Reading For Entire File.... ..... .5111
Last Reading For Entire File..... ..... .5143.5
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name. . .
Version Number. ......... .1.0.0
Date of Generation.... ...02/11/25
Maximum Physical Record..65535
File Type. . . . . . . . . . . . . . . . LO
Next File Name......... ..STSLIB.006
Physical EOF
Mean Nsam
5127.25 66
10.2959 66
(
.0
80.6
.0
.0
First
Reading
5111
5111
Last
Reading
5143.5
5143.5
(
File Header
Service name... ...... ....STSLIB.006
Service Sub Level Name. . .
Version Number. ....... ...1.0.0
Date of Generation.. .... .02/11/25
Maximum Physical Record..65535
File Type............. ...LO
Previous File Name...... .STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPM
RPD
RPS
RPX
GR
FET
ROP
$
6
(
header data for each bit run in separate files.
7
.5000
START DEPTH
5097.5
5111.5
5111.5
5111.5
5111.5
5111.5
5144.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
8698.0
8698.0
8698.0
8698.0
8691.0
8698.0
8745.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
24-JUL-02
Insite
66.37
Memory
8745.0
5143.0
8745.0
75.5
102.9
TOOL NUMBER
151107
156401
6.125
5111.0
Flo Pro
9.20
52.0
9.1
29000
5.5
.180
.120
.160
.200
62.0
93.5
62.0
62.0
(
(
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ....... .......0
Data Specification Block Type.....O
Logging Direction........ ...... ...Down
Optical log depth units...... .... .Feet
Data Reference Point.. ........... . Undefined
Frame Spacing.... ...... ...... .... .60 .1IN
Max frames per record...... ...... . Undefined
Absent value........ ....... ...... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5097.5 8745 6921.25 7296 5097.5 8745
ROP MWD070 FT/H 0.63 729.31 207.126 7203 5144 8745
GR MWD070 API 35.72 128.66 83.3239 7160 5111.5 8691
RPX MWD070 OHMM 0.14 1582.17 23.0963 7174 5111.5 8698
RPS MWD070 OHMM 0.24 1585.99 27.5483 7174 5111.5 8698
RPM MWD070 OHMM 5.17 2000 30.2369 7176 5097.5 8698
RPD MWD070 OHMM 5.81 2000 32.1487 7174 5111.5 8698
FET MWD070 HOUR 0.15 186.28 0.635991 7174 5111.5 8698
First Reading For Entire File......... .5097.5
Last Reading For Entire File... .... ....8745
File Trailer
Service name.. ..... ..... .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation. ..... .02/11/25
Maximum Physical Record..65535
F i 1 e Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.007
Physical EOF
Tape Trailer
Service name.. .... ...... .LISTPE
Da te. . . . . . . . . . . . . . . . . . . . . 02/11/25
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name... ...... ...... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... .UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 02/11/25
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name... ....... . UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Physical EOF
Physical EOF
End Of LIS File
(
Writing Library. Scientific Technical Services
Writing Library. Scientific Technical Services