Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-147
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
dO:J. - L Lt 7 Well History File Identifier
Organizing (done)
0 Two-sided 1111111111111111111
0 Rescan Needed 1111111111111111111
RESCAN
DIGITAL DATA
~kettes, No. 9-
0 Other, NolType:
OVERSIZED (Scannable)
0 Maps:
0 Color Items:
0 Greyscale Items:
0 Other Items Scannable by
a Large Scanner
0 Poor Quality Originals:
OVERSIZED (Non-Scannable)
0 Other:
0 Logs of various kinds:
NOTES:
Scanning Preparation
,
x 30 = 3 ()
0 Other:: I ,()
Date: 10 I ð if /s/ V11,
, ., 1111111111111111111
Date: t D J () f.:, /s/ Vt1P
I J
+ '{)¡J = TOTAL PAGES l~.
(c~ount. .d. oes~otJnclude cover sheß J!J
Oate: I f) {, " if /s/ r
, 1111111111111111111
BY:
Helen (Maria';
Project Proofing
BY:
Helen ( Maria~)
BY:
Helen ~aria )
Production Scanning
Stage 1
Page Count from Scanned File:
(p()
(Count does include cover sheet)
Stage 1
Page Count Matches Number in Scanning Preparation:
Heier( Maria)
If NO in stage 1, page(s) discrepancies were found:
(/ YES. !'
r
Date: 1°,. ¡~ {Jif
YES NO
NO
/s/ mP
BY:
BY:
Helen Maria
Date:
Is/
II - I
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Helen Maria
Date:
Is/
Comments about this file:
Quality Checked
1111111111111111111
8/24/2004 Well History File Cover Page.doc
I { J¡i-~\.f
DATA SUBMITTAL COMPLIANCE REPORT
9/7/2004
Permit to Drill 2021470
Well Name/No. MILNE PT UNIT SB S-03L 1
Operator BP EXPLORATION (ALASKA) INC
MD 1 0260 ~ TVD 4193 --- Completion Date 8/11/2002./
Completion Status 1-01L
Current Status 1-01L
REQUIRED INFORMATION
S j14 (,!--. ~ /J.,V; À,í'i l-
API No. 50-029-23105-60:00
UIC N
------ ------~ +
Mud Log No
Samples No
Directional Survey Yes
----- ~--------~'-----~-~ ~ -
DATA INFORMATION
Types Electric or Other Logs Run: MWD, LWD, GR, RES, ABIIIFR /CASANDRA
Well Log Information:
-_._~~"_._-~~---- ~-
(data taken from Logs Portion of Master Well Data Maint)
Electr
Digital Dataset
Med/Frmt Number Name
LIS Verification
~31 LIS Verification
Logl
Data
Type
Rpt -
~D
Log Log Run
Scale Media No
1
1
Interval OH /
Start Stop CH Received
73 1 0207 C-ãSê 12/3/2002
(¡-. ,........-- ,
73 10207 Gase- 12/3/2002
u¡z.v.-
1f9J3 10260 Open 8/27/2002
~ 10260 Open 8/27/2002
(Jill 0
(~D
Directional Survey
Directional Survey
Rpt Directional Survey
Rpt Directional Survey
'Í~D CAse ('11956 LIS Verification
v5D C Pdf (.............--~956 I nduction/Resistivíty
3D C Pdf (,-11956 Induction/Resistivity
Well Cores/Samples Information:
6913 10260 Open 8/27/2002
1 6913 10260 Open 8/27/2002
1,2,5,6, 73 1 0261 Open 6/2/2003
Final 110 10260 Open 6/2/2003
Comments
-~~^~---_.-----_.._------_.--~
f í I~ í(
MWD
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 7/11/2002.
MWD
'-"-
Final
110
MWD - ROP, DGR, EWR -
MD
4192 Open 6/2/2003 MWD - DGR, EWR - TVD
25
25
Name
Interval
Start Stop
Sample
Set
Number Comments
Sent
Received
--~----~--- -
DATA SUBMITTAL COMPLIANCE REPORT
9/7/2004
Permit to Drill 2021470
Well Name/No. MILNE PT UNIT SB S-03L 1
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23105-60-00
MD 10260
TVD 4193
Completion Date 8/11/2002
Completion Status 1-01L
Current Status 1-01L
UIC N
Well Cored?
ADDITIONAL INFORMATION
y'Z0
Daily History Received?
GJ/N
G)/N
Chips Received? ~
Formation Tops
Analysis
Received?
~
------'---~~~-~.'---'-
---~------_____n__-___----.-
'-"',
Comments:
Compliance Reviewed By:
~
Date: )~ ~ ~ltt-. ~q- ~1==~=
-,
ê)o:9'-I'/?
-# 1/95'07
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7tß Avenue, Suite 100
Anchorage, Alaska 99501
April 14, 2003
RE: MWD Fonnation Evaluation Logs:
l\1PS-03 L1,
AK-MW-22 127
MPS-03 Ll:
Digital Log Images:
50-029-23105-60
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATIACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
RECEIVED
Date:
JUN 0 2 2003
Alaaka 0;1 & Gas Cons. Comn1i8IiIn
And10rage
d-O~-l Lf1
Sign~é'\~~ ~'-~
~~'~ ~ ~
~O¿;)-ILj 7
/ 133 !
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
33 3 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 27, 2002
RE: MWD Formation Evaluation Logs MPS-03 L1,
AK-MW-22127
1 LIS formatted Disc with verification listing.
API#: 50-029-23105-60
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
Si~r>~o~
RECEIVED
DEe 03 zoo,
Apol"f1Ø ,c.:.;,
~w ~~~ ~ ~i$ C;" ~
AnN.""":':............... ......WI. .,'~' Çqmmi,MiAA. ',.,.,
"~~~J" ,. ~l
(
('
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised 10/03/02, Start Production
1. Status of Well
IBI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface ""-'.- -----"~N'"
3368' NSL, 4744'.W~L, SEC. 07, T12N, R11 E, UM¡ r:;~'¡)i~,):,¡O¡,j 1
At top of productive Interval ~ DATE ¡
4090' NSL, 989' WEL, SEC. 07, T12N, R11 E, UM (OA) .1 ~.~rQk. ,,'
At total depth ~ W.p'r:¡ÐJ ¡
621' NSL, 1157'WEL, SEC. 07, T12N, R11E, UM (OA) i.~:::::J
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designaflon and Senal No.
KBE = 66.2' ADL 380110
12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband.
8/6/2002 8/8/2002 8/11/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
10260 4193 FT 10260 4193 FT 0 Yes IBI No
22. Type Electric or Other Logs Run
MWD , LWD , GR , RES, ABI/IFR I CASANDRA
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE
20" 92# H-40 28' 112' 42"
7-5/8" 29.7# L-80 28' 6943' 9-7/8"
4-1/2" 12.7# L-80 6921' 10204' 6-1/8"
Classification of Service Well
7. Permit Number
202-147
8. API Number
50- 029-231 05-60
9. Unit or Lease Name
Milne Point Unit
10. Well Number
MPS-03L 1
11. Field and Pool
Milne Point Unit 1 Schrader Bluff
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1800' (Approx.)
CEMENTING RECORD
260 sx Arctic Set (Approx.)
1358 sx PF 'LI, 308 sx Class 'G'
Uncemented Slotted Liner
TUBING RECORD
SIZE DEPTH SET (MD)
4-1/2", 12.6#, L-80 6835'
3-1/2", 9.2#, L-80 6835' - 6887'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 33 Bbls of Diesel
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
25.
MD
TVD
TVD
MD
6969' -10160' 4178' - 4199'
27.
Date First Production
September 8, 2002
Date of Test Hours Tested
9/11/2002 12
Flow Tubing Casing Pressure
Press.
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-BBL
TEST PERIOD 1995
GAs-McF
643
GAs-McF
WATER-BBL
3046
WATER-BBL
CALCULATED
24-HoUR RATE
OIL-BBL
AMOUNT PULLED
PACKER SET (MD)
6835'
CHOKE SIZE
176 I 64ths
OIL GRAVITY-API (CORR)
GAS-OIL RATIO
322
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. S'R'mTV ED
No core samples were taken.
28.
RBDMS 8Fl OCT 9 2002
G(C
Form 10-407 Rev. 07-01-80
OCT 0 4 2002
Alaska OU& Gas Gons. Commtsslon
Anchorage
Submit In Duplicate
(
(
29. Geologic Markers
Marker Name Measured
Depth
SBF2-NA 6605\
SBF1-NB 6661'
SBE4-NC 6730'
SBE2-NE 6762'
SBE1-NF 6875'
TSBD-OA 6954'
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
4035'
4059'
4087'
4100'
4146\
4174'
RI€I'VED
OCT 0 4 2002
Alaska OiJ& Gas Cons. Commlssfon
Anchorage
31. List of Attachments:
Post Rig Summary.
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Sondra ~". Title Technical Assistant
MPS-03L 1
Well Number
202-147
Permit No. / Approval No.
Date lO.- 0 -~-O 7-
Prepared By Name/Number: Sondra Stewman, 564-4750
Drilling Engineer: Steve Campbell, 564-4401
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
3...#
~
p"
(
(
Well:
Field:
API:
Permit:
MPS-03 & L 1
Milne Point Unit
50-029-23105-00/50-029-23105-60
202-146/202-147
Rig Accept: 07/27/02
Rig Spud: 07/28/02
Rig Release: 08/11/02
Drilling Rig: Doyon 141
POST RIG WORK
08/13/02
Pulled BPV, Pulled Ball & Rod, Pulled RP, Set DGLV, Pulled RHC body. Lost 2.62" roller out of roller
stem.
08/17/02
Set Jet Pump (BP-1068, 13A). Note: Had to jar pump several times to keep moving after 3700' wlm.
08/30/02
Pressure tested surface equipment to 3000 psi. Pumped 45 bbls MeOH at 1.25 bpm w/ 1250-psi max
down the IA. Switched to the tubing and PT to 2500 psi. Pumped 35 bbls of diesel down tubing at 1.40
bpm wi 900-psi max.
09/08/02
Arrived location, held pre-job safety meeting, Pressure tested to 3800 psi. Start down the IA with 45 bbls
MeOH @ 1 bpm wi 975 psi max. Switched to tubing and pumped 35 bbls diesel @ 1.4 bpm wi 1150 psi
max.
09/09/02
Pulled & Rerun New Jet Pump, Old one had (2) pieces of 3/16" shear stock in throat from kick over tool.
Other than the shear stock there were no visible signs of damage to the pump. Popped well, well lifting.
. .
:r '
STATE OF ALASKA .
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
(
1. Status of Well
DšI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 202-147
3. Address 8. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-23105-60
4. Location of well at surface ~TòéAt~...;t. 9. Unit or Lease Name
3368' NSL, 4744' WEL, SEC. 07, T12N, R11E, UMl Mine Po nt Un t
At top of productive interval . ~'.:,.. i i i
4090' NSL, 989' WEL, SEC. 07, T12N, R11 E, UM (OA) ~~~ f10. Well Number
At total depth ~ 8. ~lr-&J MPS-03L 1
621' NSL, 1157'WEL, SEC. 07, T12N, R11E, UM (OA) ~\...~,.)'.""<;l~~~-.'J'
." 11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff
KBE = 66.2' ADL 380110
12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband.
8/6/2002 8/8/2002 8/11/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
10260 4193 FT 10260 4193 FT DšI Yes 0 No
22. Type Electric or Other Logs Run
MWD , LWD , GR , RES, AB / IFR / CASANDRA
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD
20" 92# H-40 28' 112' 42" 260 sx Arctic Set (Approx.)
7-5/8" 29.7# L-80 28' 6943' 9-7/8" 1358 sx PF 'L', 308 sx Class 'G'
4-1/2" 12.7# L-80 6921' 10204' 6-1/8" Uncemented Slotted Liner
Classification of Service Well
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1800' (Approx.)
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
6969' - 10160' 4178' - 4199'
26.
TUBING RECORD
SIZE DEPTH SET (MD)
4-1/2", 12.6#, L-80 6835'
3-1/2'" 9.2#, L-80 6835' - 6887'
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 33 Bbls of Diesel
PACKER SET (MD)
6835'
25.
MD
TVD
MD
TVD
27.
Date First Production
Not on Production
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
NIA
PRODUCTION FOR OIL-BBL
TEST PERIOD
GAs-McF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28 CORE DATA :'f"" ,I. ".~' ii'".
. Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water.(:~SJbrfm cHöri ¿~'iJ¡.
OIL-BBL
GAs-McF
WATER-BBL
OIL GRAVITY-API (CORR)
No core samples were taken.
Form 10-407 Rev. 07-01-80
h 0 M S B FL SEP I I 2002 Submit In Duplicate
'"
('
('
29. Geologic Markers
Marker Name Measured
Depth
SBF2-NA 6605'
SBF1-NB 6661'
SBE4-NC 6730'
SBE2-NE 6762'
SBE1-NF 6875'
TSBD-OA 6954'
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
4035'
4059'
4087'
4100'
4146'
4174'
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys and a Leak-Off Integrity Test Summary.
32. I hereby certify that the foregoing is true ~correct to the best of my knowledge
Signed sondra~ Tille Technical Assistant
MPS-03L 1 202-147
Well Number Permit No. I Approval No.
Date c:::s=1- 0-<1: ' CJ7-
Prepared By Name/Number: Sondra Stewman, 564-4750
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Legal Name: MPS-03
Common Name: MPS-03
. T8Ït Date. . Test Type
8/3/2002 FIT
Test Depth (TMD)
7,350.0 (ft)
Leak-Off Test Summary
Test Depth (TVD)
4,232.0 (ft)
AMW
8.60 (ppg)
. Surfåéè p,reå8ure '~.LokoffP~Ur. (B~P)
650 (psi) 2,541 (psi)
Page 1 of 1
EMW
11.56 (ppg)
~.
.-,
Printed: 8/1212002 2:52:28 PM
(
Page 1 of6
BP-.
..: ;~~Rl!r@~.~I1~.>~Pl11m~I)f~~~Q()rt '
-,(", .
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-03
MPS-03
DRILL +COMPLETE
DOYON
DOYON 141
, "0' . ,. -
,. ' - . r. - -.
Datè. . : From ~Tó'Hours..'Task .Code,N()I\ Pha~..
7/2712002
14:30 - 18:00 3.50 MOB P
18:00 - 19:30 1.50 RIGU P
19:30 - 22:00 2.50 RIGU P
22:00 - 00:00 2.00 RIGU P
00:00 - 01 :00 1.00 RIGU P
01 :00 - 08:00 7.00 DRILL P
08:00 - 09:30 1.50 DRILL P
09:30 - 10:00 0.50 DRILL P
10:00 - 12:00 2.00 DRILL P
12:00 - 12:30 0.50 DRILL P
12:30 - 13:00 0.50 DRILL P
13:00 - 00:00 11.00 DRILL P
INT1
INT1
INT1
INT1
PRE
PRE
7/2812002
PRE
PRE
PRE
INT1
INT1
INT1
7/29/2002 00:00 - 10:00 10.00 DRILL P
10:00 - 11 :30 1.50 DRILL P
11 :30 - 14:30 3.00 DRILL P
14:30 - 16:30 2.00 DRILL P
16:30 - 18:00 1.50 DRILL P
18:00 - 22:30 4.50 DRILL P
22:30 - 23:30 1.00 DRILL N
23:30 - 00:00 0.50 DRILL P
7/30/2002 00:00 - 23:00 23.00 DRILL P
23:00 - 23:30 0.50 DRILL N
23:30 - 00:00 0.50 DRILL P
7/31/2002 00:00 - 06:00 6.00 DRILL P
INT1
INT1
INT1
INT1
INT1
INT1
RREP INT1
INT1
INT1
RREP INT1
INT1
INT1
06:00 - 08:30 2.50 CASE P INT1
08:30 - 15:30 7.00 CASE P INT1
15:30 - 16:30 1.00 CASE P INT1
16:30 - 18:30 2.00 CASE P INT1
Start: 7/27/2002
Rig Release: 8/11/2002
Rig Number: 141
Spud Date: 7/28/2002
End:
. ",,-,:'.: ',;, .-5." '
. . Ðescriptionof Operations
MOVE RIG FROM MPS-05 TO MPS-03
RIG UP ON MPS-03 RIG ACCEPT TO DRILL @ 19:30
7/27/2002
NIPPLE UP DIVERTER
LOAD PIPE SHED,TAKING ON WATER FOR SPUD MUD
FINISH LOADING PIPE SHED
PICKING UP DRill PIPE AND STANDING IN DERRICK
HAVE 110 STANDS, MIXING SPUD MUD
PICK UP HWDP AND JARS NMDC STAND IN DERRICK
FUNCTION TEST DIVERTER, WITNESS OF DIVERTER
TEST WAS WAIVED BY CHUCK SCHEVE AOGCC
PICK UP BHA #1
CIRC. AND CHECK MUD SYSTEM FOR LEAKS
PRE-SPUD MEETING
SPUD WELL, DIRECTIONAL DRILL 112'TO 1475' WITH 1700
PSI 450 GALS PER MIN. 6O-S0 RPMS 15-3OK BIT wr. AST
3.25 ART 3.25 TQ 5
DIRECTIONAL DRILL 1475' TO 3527 1 WITH 2800 PSI 450
GALS PER MIN. 80 RPMS 25-30K BIT WT. AST1.5 ART 4
TQ 4-6000
CIRC. THREE BOTTOMS UP,WITH 2800 PSI 450 GAL PER
MIN. 80 RPMS, STANDING BACK ONE STAND PER
BOTTOMS UP.
PUMP OUT WITH FULL DRILLING RATE TO BHA
TRIP OUT AND IN WITH BHA, CHANGE OUT BIT, PULSE
TEST MWD
TRIP IN HOLE WASHED 90 FT. TO BOTTOM @ 3527
DIRECTIONAL DRILL 3527' TO 4458 WITH 2900 PSI 450
GALS PER MIN. 80 RPMS 25-30K BIT WT.
TQ 4-7000
PULL ONE STAND, CIRC THRU HEAD PIN, CHANGE OUT
SWIVEL PACKING ON TOP DRIVE, WASH TO BOTTOM
DIRECTIONAL DRILL 4458' TO 4465' WITH 2900 PSI 450
GALS PER MIN. 80 RPMS 25-30K BIT WT. AST.75 ART 1.75
TQ 4-7000
DIRECTIONAL DRILL 4465' TO 6842 WITH 3280 PSI 500
GALS PER MIN. 80 RPMS 25-30K BIT WT.
TQ 7000-1000
CIRC AND CHANGE LINER IN ONE PUMP
DIRECTIONAL DRILL 6842 TO 6880' WITH 3280 PSI 500
GALS PER MIN. 80 RPMS 25-30K BIT WT.
TQ 7000-1000 AST 11.5 ART 3.75
DIRECTIONAL DRill 6,880 TO 7 5/8 CASING POINT AT
7,320' WITH 3600 PSI 500 GALS PER MIN. 80 RPMS 25-30K
BITWT.
TQ 7,000-10,000 AST 3.5 ART 1.25
CIRC, THREE BOTTOMS UP 4,000 PSI 525 GALS MIN.,1 00
RPMS, STANDING BACK ONE STAND PER BOTTOMS UP
PUMP OUT TO HWDP, WITH FUll DRILLING RATE
ATTEMPT TO PULL @ 3,000 FT AND 1500, WEll SWABED
SLIP AND CUT DRILLING LINE, SERVICE TOP DRIVE
TRIP IN BRIDGE @ 1,400 AND 2.200 WORKED THRU, TRIP
IN TO 3,400 TO 4,275, HOLE ACTING STICKY.
Printed: 8112/2002 2:52:35 PM
BP
9.p~rél'i9D~~~tnmélry~,port
Pase2of6
Legal Well Name: MPS-03
Common Well Name: MPS-03 Spud Date: 7/28/2002
Event Name: DRILL +COMPLETE Start: 7/27/2002 End:
Contractor Name: DOYON Rig Release: 8/11/2002
Rig Name: DOYON 141 Rig Number: 141
Date. .From~To Hours... . Task . Code.;NPT . Phase. . Description of Operatio",s
7/31/2002 18:30 - 00:00 5.50 CASE P INT1 PUMPING OUT TO HWDP, AND TRIP OUT WITH BHA
DOWN LOAD MWD
8/1/2002 00:00 - 01 :00 1.00 CASE P INT1 LAY DOWN MOTOR AND MWD
01 :00 - 02:30 1.50 CASE P INT1 PICK UP HOLEOPENER AND TRIP IN TO 1,350
02:30 - 06:00 3.50 CASE P INT1 REAMING 1,350 TO 2900 WITH 150 RPM 550 GALS MIN.
1600 PSI
06:00 - 06:30 0.50 CASE P INT1 TRIP IN TO 4,200'
06:30 - 13:00 6.50 CASE P INT1 REAMING 4,200 TO 7,320 WITH 150 RPM 550 GALS MIN.
3,300 PSI, TQ 8,000
13:00 - 15:30 2.50 CASE P INT1 CIRC, THREE BOTTOMS UP, WITH 150 RPMS, 3,300 PSI,
550 GALS PER MIN., STANDING BACK ONE STAND PER
BOTTOMS UP.
15:30 - 18:00 2.50 CASE P INT1 SLUG PIPE, TRIP OUT TO BHA
18:00 - 19:30 1.50 CASE P INT1 LAY DOWN BHA
19:30 - 21 :00 1.50 CASE P INT1 CLEAR FLOOR, RIG UP CSG TOOLS, PJSM
21 :00 - 00:00 3.00 CASE P INT1 RUNNING 7 5/8 29.7# l-80 BTC TO 2,300'
81212002 00:00 - 05:00 5.00 CASE P INT1 RUNNING 7 5/8 29.7# L-80 BTC FT FROM 2300' TO 7,301
BRIDGE @ 2,700 AND TIGHT FROM 2,700 TO 3,600 -
CASING HANGING UP EVERY 40' WHEN CENTRALIZER
WENT BY TIGHT SPOT - WHEN CENTRALIZERS BELOW
2,700', NO PROBLEM - LANDED CSG 40K STRING WT.
LEFT
05:00 - 05:30 0.50 CASE P INT1 RIG DOWN FRANKS TOOL, RIG UP CEMENT HEAD
05:30 - 08:00 2.50 CASE P INT1 CIRCULATE AND CONDITION MUD FOR CEMENT AT 6
BPM 350 PSI - MUD AT BOTTOMS UP 250 SEC/QT, 9.6 PPG
- CIRCULATE TWO CASING VOLUME - FINAL MUD WT. 9.2
PPG, 46 SEC/QT VISCOSITY
08:00 - 11 :30 3.50 CASE P INT1 CEMENT 7 5/8 PRODUCTION CASING AS FOLLOWS: 50
BBLS OF WATER AHEAD + 50 BBLS OF ALPHA SPACER
MIXED AT 10.2 PPG, FOLLOWED BY 1155 SX CLASS 'l'
MIXED AT 10.7 PPG, 854 BBLS OF SLURRY PUMPED AT
AVERAGE 6.5 BPM 350 »>1150 PSI. AT 662 BBlS OF
LEAD SLURRY AWAY. RETURNS STARTED TO
DECREASE, SLOWED PUMP RATE TO 5 BPM. AT 750
BBlS AWAY, NO RETURNS. CONTINUE PUMPING LEAD
SLURRY FOR ADDITIONAL 104 BBlS AT 2 TO 4 BPM,
WORK PIPE, NO SUCCESS IN GETTING RETURNS BACK.
TAILEDWtTH 300 SX CLASS 'G' W/1 % CACL MIXED AT
15.8 PPG, 61 BBLS OF SLURRY - DROP TOP PLUG WITH
30 BBlS OF WATER.
11:30 -12:30 1.00 CASE P INT1 DISPLACE WITH 9.2PPG MUD AT 6 BPM 1000 »> 1200
PSI. WITH RIG PUMP. BUMP PLUG TO 1000 PSI OVER-
FLOATS OK, NO CEMENT TO SURFACE - CIP AT 1230 HRS
8/2/02 - RIG PUMP EFFICIENCY 96%
12:30 - 13:30 1.00 CASE P INT1 LAY DOWN LANDING JT,FLUSH OUT DIVERTER
13:30 - 15:30 2.00 CASE P INT1 NIPPLE DOWN, DIVERTER
15:30 - 17:30 2.00 CASE N CEMT INT1 RIG UP AND RUN 729 FT OF 1" PIPE FOR TOP JOB
17:30 - 19:00 1.50 CASE N CEMT INT1 CIRC DOWN 1 H WITH 150 BBlS OF WATER 1.5 BBLS MIN
1000 PSI, DYE AND SPACER TO SURFACE AFTER WE
PUMPED 50 BBLS WATER.
19:00 - 21:00 2.00 CASE N CEMT INT1 CEMENT DOWN 1" WITH 1.5 BBlS MIN., 1200 PSI,
PUMPED 250 SXS. CLASS l MIXED @ 10.7. 150 BBlS
PUMPED, 22 BBLS TO SURFACE.
Printed: 811212002 2:52:35 PM
Page 3 of6
/....BP
'QP..'.....~ra.;...~~ti.)).~.',".~:.:S. :..J~m.'.. m.:_..,~Jj:'J~~~rt....,.
,-', " ... . -' . .:" '. ~- " ....' . ",.--"
, ~.-......
MPS-03
MPS-03
DRILL +COMPLETE Start: 7/27/2002
DOYON Rig Release: 8/11/2002
DOYON 141 Rig Number: 141
1.00 CASE P INT1 ORIENT AND NIPPLE UP WELL HEAD, TEST TO 1000 PSI
FOR 10MIN.
NIPPLE UP BOPS
NIPPLE UP, BOPS
RIG UP AND TESTING BOPS 250 LOW 4,000 HIGH,
ANNULAR 250-2500 PSI, WITNESS OF BOP TEST WAS
WAVIER BY JOHN CRISP AooGC @ 22:00 8/2/2002,
INSTALL WEAR RING
NIPPLE UP FLOW LINE RISER
PICKING UP BHA, #4 PDC SEC 2643 WITH 3/12 JETS, 4 3/4
SPERRYDRILL LOPE 1.5 MOTOW, FLOAT SUB, 43/4
DGRlEWRlDM,HAND OFF SUB, 3 FLEX COLLARS,JARS,2 -4
DP.
TRIPPING IN TO 7198
CIRC FOR CSG TEST
TEST CSG TO 4,000 PSI FOR 30 MIN.
REPAIR AIR COMPRESSORS
DRILL FLOAT AND SHOE AND NEW HOLE, FROM 7320' TO
7,350'
CIRC FOR FIT TEST
FIT TEST WITH, 8.6 MUD, TVD 4232, 650 PSI = 11.5
CIRC. AND DISPLACE HOLE WITH NEW 9.1 FLOW-PRO
MUD
PROD1 DRILL DIRECTIONAL 7,350' TO 8,162' WITH 80 RPMS,
2-4,000 BIT WT., 1860 PSI, 250 GALS MIN, TO 5,000, AST 1
HR, ART 4 HR
PROD1 DRILL DIRECTIONAL 8,162' TO TD @ 10270' WITH 80
RPMS, 2-4,000 BIT WT., 1950 PSI, 250 GALS MIN, TO 7,000,
AST 2.5 ART 7.75
COMP CIRC, FOUR BOTTOMS UP WITH 280 GALS MIN. 2400 PSI
,100 RPMS
COMP PUMPING OUT TO CSG SHOE, DISPLACING HOLE WITH
NEW MUD
COMP PUMPING OUT TO CSG SHOE, DISPLACING HOLE WITH
NEW MUD
COMP TRIPPING OUT FOR LINER
COMP STAND BACK BHA
COMP RIG UP CSG TOOLS AND PJSM
COMP PICKING UP 4.512.6# L-80 IBT SLOTTED LINER, TOTAL 76
JTS
COMP PICKING UP LINER HANGER
COMP TRIPPING IN WITH LINER, TO 10,256' LINER TOP, 7,200'
COMP DROP BALL, CIRC BALL DOWN @ 1.5 BBLS MIN., SET
LINER WITH 1,500 PSI, SHEAR BALL WITH 1900 PSI, SET
PACKER WITH 45,000 # STRING WT.
CUT DRILLING LINE AND SERVICE TOP DRIVE
TRIPPING OUT, LAY DOWN RUNNING TOOL
PJSM, PICK UP SPACE OUT JTS,WHIPSTOCK,AND BHA
TRIPPING IN WITH WHIPSTOCK
ORIENTING TO 8 DREGEES TO THE LEFT, TRYING TO
SET ANCHOR ON WHIPSTOCK, WOULDN'T SET
DFAL PROD2 TRIPPING OUT WITH WHIPSTOCK,
DFAL PROD2 FINISH TRIP OUT WITH WHIPSTOCK, EMERG. SHEAR SUB
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
. Dåte
.From...~~To
8/2/2002
21 :00 - 22:00
81312002
22:00 - 00:00
00:00 - 00:30
00:30 - 05:00
05:00 - 07:00
07:00 - 09:00
09:00 - 11 :00
11 :00 - 11 :30
11 :30 -12:30
12:30 -13:00
13:00 - 14:30
14:30 -15:00
15:00 -15:30
15:30 - 17:00
17:00 - 00:00
8/4/2002 00:00 -17:30
17:30 - 22:00
22:00 - 00:00
8/5/2002 00:00 - 01 :00
01 :00 - 03:00
03:00 - 04:00
04:00 - 04:30
04:30 - 06:30
06:30 - 07:00
07:00 - 09:30
09:30 - 10:30
10:30 - 11 :30
11 :30 - 14:00
14:00 - 17:00
17:00 - 19:30
19:30 - 20:30
20:30 - 00:00
8/6/2002 00:00 - 01 :30
2.00 CASE P
0.50 CASE P
4.50 CASE P
2.00 CASE P
2.00 CASE P
2.00 CASE P
0.50 CASE P
1.00 CASE P
0.50 CASE N
1.50 CASE P
0.50 CASE P
0.50 CASE P
1.50 CASE P
7.00 DRILL P
17.50 DRILL P
4.50 CASE P
2.00 CASE P
1.00 CASE P
2.00 CASE P
1.00 CASE P
0.50 CASE P
2.00 CASE P
0.50 CASE P
2.50 CASE P
1.00 CASE P
1.00 CASE P
2.50 CASE P
3.00 STWHIP P
2.50 STWHIP P
1.00 STWHIP P
3.50 STWHIP N
1.50 STWHIP N
Spud Date: 7/28/2002
End:
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
RREP INT1
INT1
INT1
INT1
INT1
COMP
COMP
PROD2
PROD2
PROD2
Printed: 811212002 2:52:35 PM
Page 4 of6
.SP.
. .
.....-()per~~.gn~,.$l.1mm~ry.....~~P()rt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
. . , -
. , . .
.Däte.,.,..: .From~To.
MPS-03
MPS-03
DRILL +COMPLETE
bOYON
DOYON 141
. .' '....
HøûrS.. .TaSk.~.Cpd~::'NPr: :Phasè:.
8/612002
1.50 STWHIP N
DFAL PROD2
00:00 - 01 :30
01 :30 - 02:00 0.50 STWHIP N DFAL PROD2
02:00 - 03:30 1.50 STWHIP N DFAL PROD2
03:30 - 04:00 0.50 STWHIP N DFAL PROD2
04:00 - 07:00 3.00 STWHIP N DFAL PROD2
07:00 - 11 :00 4.00 STWHIP N DFAL PROD2
11 :00 - 11 :30 0.50 STWHIP P PROD2
11 :30 - 16:30 5.00 STWHIP P PROD2
16:30 -18:00 1.50 STWHIP P PROD2
18:00 - 20:30 2.50 STWHIP P PROD2
20:30 - 21 :30 1.00 STWHIP P PROD2
21 :30 - 22:00 0.50 STWHIP P PROD2
22:00 - 23:30 1.50 STWHIP P PROD2
23:30 - 00:00 0.50 STWHIP P PROD2
8n/2002 00:00 - 00:30 0.50 STWHIP P PROD2
00:30 - 02:30 2.00 STWHIP P PROD2
02:30 - 09:00 6.50 DRILL P PROD2
09:00 - 09:30 0.50 DRILL N DFAL PROD2
09:30 - 12:00 2.50 DRILL N DFAL PROD2
12:00 - 13:30 1.50 DRILL N DFAL PROD2
13:30 -16:00 2.50 DRILL N DFAL PROD2
16:00 -17:00 1.00 DRILL N DFAL PROD2
17:00 - 17:30 0.50 DRILL N DFAL PROD2
17:30 - 00:00 6.50 DRILL P PROD2
8/812002 00:00 - 17:30 17.50 DRILL P PROD2
Start: 7/27/2002
Rig Release: 8/11/2002
Rig Number: 141
Spud Date: 7/28/2002
End:
. .
.':'.Descnptioo.of.Opetations
HAD CAME APART AND LEFT EVER THING BELOW IT IN
HOLE, TOTAL OF 246.94 FT., TOP OF FISH IS @ 6961.05,
SEAR SUB FISHING NECK IS 3 1/4, LAY DOWN
WHIPSTOCK AND MILLS, MWD
PICK UP FISHING BHA, 5 3/4 OVERSHOT WITH 3 1/4
GRAPPLE, BUMPER SUB,OIL JARS,12 DC,15 HWP
TRIP IN WITH OVERSHOT TO 6961
WORKING OVER FISH AND JAR FREE, WITH 50,000
OVERPULL
TRIPPING OUT WITH FISH - LD FISH AND FISHING TOOLS
MAKE UP WHIPSTOCK ASSEMBLY - RIH TO 7207'
ORIENT AND SET WHIPSTOCK TO 18 L OF HIGH SIDE -
TOP OF WINDOW 6943'
MILL WINDOW FROM 6943' TO 6967' - TOP WINDOW 6943 -
BTM WINDOW 6955' - UPPER MILL 6.75" IN GAUGE - WOB
2K TO 15K - GPM 280 - PP 1450 - RPM 100 TO 130 - TO 7K
ON BTM - 4K OFF BTM - PU 112K - SO 75K - ROT 87K
PUMP SWEEP - CIRC 3 X - @ 290 GPM - PP 1500 - RPM 120
- TQ 4K - PU 112 - SO 78 - ROT 90
OBSERVE WELL - PUMP DRY JOB - POH TO BHA
STAND IN DERRICK - DC'S - HWDP - LD BUMPER SUB -
MWD - MILLS
MAKE UP STACK WASHER - FLUSH OUT BOPS - LAY
DOWN STACK WASHER
PU MOTOR - MAKE UP BIT - PU - MWD - CHANGE OUT
PULSER - ORIENT - UP LOAD MWD
RIH TO 1250'
RIG SERVICE TOP DRIVE - CHANGE OUT SPINNERS ON
IRON ROUGHNECK
RIH TO 6917' - ORIENT - CON'T RIH TO 6967' - NO
PROBLEMS GOING THROUGH WINDOW
DIRECTIONAL DRILL FROM 6967' TO 7507' - WOB 0 TO 3K -
RPM 90 - TQ ON BTM 5K - TO OFF BTM 4K - GPM 250 - PP
ON BTM 1870 - PP OFF BTM 1660 - PU 108K - SO 67 - ROT
82
OBSERVE WELL - PUMP OUT TO 7000' - PULL THROUGH
WINDOW - NO PROBLEMS - TRIP FOR LWD FAILURE -
LOG OUAIL TV POOR - PROBLEM WITH PULSER
OBSERVE WELL - PUMP DRY JOB - POH TO BHA
STAND BACK JARS - FLEX DC'S - DOWN LOAD MWD - CIO
PULSER - GAUGE BIT - ORIENT - UP LOAD MWD - RIH W /
BHA - PULSE TEST MWD
TIH WITH 4" DP TO 6806' - FILLING PIPE EVERY 25
STANDS
CUT DRLG LINE - RIG SERVICE TOP DRIVE - BLOCKS
ORIENT TO HI-SIDE - TRIP THROUGH WINDOW - CON'T
RIH TO 7461' - PRECAUCTIONARY WASH FROM 7461' TO
7507'
DIRECTIONAL DRILL FROM 7507' TO 8348' - WOB 0 TO 5K-
RPM 90 - TO ON BTM 8K - TO OFF BTM 6K - GPM 250 - PP
ON BTM 1825 - OFF BTM 1700 - PU 120 - SO 61 - ROT 81
DIRECTIONAL DRILL FROM 8348' TO T.D. @ 10260' - WOB
OT04K- RPM 9O-TQON BTM 7K- TO OFF BTM6K-GPM
Printed: 8112/2002 2:52:35 PM
BP Page 50f 6
.OperationsSummaryR.port .
Legal Well Name: MPS-03
Common Well Name: MPS-03 Spud Date: 7/28/2002
Event Name: DRILL +COMPLETE Start: 7/27/2002 End:
Contractor Name: DOYON Rig Release: 8/11/2002
Rig Name: DOYON 141 Rig Number. 141
Date From - To : Hours .....Task COde NPT . [)escriptign()f ppera~ons
8/8/2002 00:00 - 17:30 17.50 DRILL P PROD2 250 - PP ON BTM 1960 - OFF BTM 1760 - PU 120K - SO 46-
ROT 82
17:30 - 21 :30 4.00 CASE P PROD2 CIRCULATE CLEAN HOLE 4 X BTM'S UP - 18000 STKS - 280
GPM -100 RPM
21 :30 - 00:00 2.50 CASE P PROD2 PUMP OUT TO 7461' - SPOTTING NEW MUD IN OPEN
HOLE - 9.1 FlO-PRO -
8/9/2002 00:00 - 00:30 0.50 CASE P PROD2 CON'T PUMP OUT TO 7000' - PULL 1 STAND TO 6900'
THROUGH WINDOW WITHOUT PUMP OR ROTATION - NO
PROBLEMS COMING THROUGH WINDOW
00:30 - 02:30 2.00 CASE P PROD2 DOWN LOAD MWD - LAY DOWN BHA
02:30 - 03:30 1.00 CASE P COMP MAKE UP BHA #10 - (BAKER) WHIPSTOCK RETRIEVING
TOOL ASSEMBLY
03:30 - 06:00 2.50 CASE P COMP RIH WITH (BAKER) RETRIEVING TOOL
06:00 - 06:30 0.50 CASE P COMP ORIENT RETRIEVING TOOL - LATCH ONTO (BAKER)
WHIPSTOCK - PULL lOOSE - OBSERVE WELL
06:30 - 09:30 3.00 CASE P COMP POH WITH WHIPSTOCK TO BHA
09:30 - 12:00 2.50 CASE P COMP LAY DOWN BHA - WHIPSTOCK - RETRIEVING TOOL
12:00 - 15:00 3.00 CASE P COMP PJSM - RU CASING TOOLS FOR 4.5" SLOTTED LINER - PU
4.5" SLOTTED liNER - 81 TOTAL JTS RAN
15:00 -15:30 0.50 CASE P COMP MAKE UP (BAKER) HOOK WALL HANGER ASSEMBLY -
CLEAR FOOR
15:30 - 17:30 2.00 CASE P COMP RIH WITH 4" DP /4.5" SLOTTED LINER TO 10204' - WENT
THROUGH WINDOW ON FIRST ATTEMPT - HOOKED
HANGER ON FIRST ATTEMPT @ 6955'
17:30 - 18:30 1.00 CASE P COMP DROP BALL - PRESSURE UP TO 3200 RELEASE HR TOOL -
BLEED PRESSURE OFF - PU TO CHECK STRING WEIGHT -
PRESSURE UP TO SHEAR BALL SEAT @ 4200
18:30 - 20:30 2.00 CASE P PROD2 OBSERVE WEll - PUMP DRY JOB - POH TO 3363'
20:30 - 22:30 2.00 CASE P PROD2 LAY DOWN 108 JOINTS OF 4" DP - SERVICE BREAK
(BAKER) LINER RUNNING TOOL - LAY DOWN RUNNING
TOOL
22:30 - 23:00 0.50 CASE P PROD2 SERVICE TOP DRIVE AND BLOCKS
23:00 - 00:00 1.00 CASE P PROD2 MAKE UP MULE SHOE - XO - RIH TO 2429'
8/1012002 00:00 - 01 :30 1.50 CASE P COMP CON'T RIH WITH 4" DRILL PIPE TP 6886'
01 :30 - 03:30 2.00 CASE P COMP BREAK CIRC - DISPLACE MUD WITH - 320 BBlS 8.8
SEAWATER - 50 BBL HI-VIS SPACER - 280 BBlS 8.8
SEAWATER - 330 BBlS 9.2 SEAWATER - GPM 441 - PP 960
- RPM 115
03:30 - 07:30 4.00 CASE P COMP OBSERVE WELL - WELL STATIC - LAYING DOWN 4" DRILL
PIPE
07:30 - 08:00 0.50 CASE P COMP PUll WEAR RING
08:00 - 09:00 1.00 CASE P COMP CLEAR FLOOR OF ALL 4" RENTAL TOOLS
09:00 - 10:00 1.00 RUNCOF\IP COMP PJSM ON RUNNING COMPLETION - RU CASING TOOLS
10:00 - 19:30 9.50 RUNCOF\IP COMP PU AND RUN 164 JOINTS 4.5" l-80 12.6# IBT TUBING - 89
CANNON ClAMPS WERE USED ON I WIRE
19:30 - 21 :00 1.50 RUNCOF\IP COMP MAKE UP TUBING HANGER - INSTALL I WIRE TO HANGER
- TEST - LAND TUBING - LAY DOWN LANDING JOINT -
TEST lWC TO 1000 PSI
21 :00 - 21 :30 0.50 RIGD P COMP CHANGE BOTTOM RAMS FROM 4" TO 3.5"
21 :30 - 22:30 1.00 RIGD P COMP NIPPLE DOWN BOP'S
22:30 - 00:00 1.50 RIGD P COMP NIPPLE UP FMC ADAPTER FLANGE - 4 1/16 5K CIW TREE -
TEST TUBING HANGER VOID TO 5K
8/1112002 00:00 - 01 :00 1.00 RIGD P COMP RIG UP HB&R - TEST LINES TO 5K - TEST TREE TO 5K
Printed: 8112/2002 2:52:35 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date. ., From ...Tô
8/1112002
00:00 - 01 :00
01 :00 - 01 :30
01 :30 - 06:00
(
Page 6 of6
BP
. " .~pe~ti~p~.;~,U.f.11~rJt¡¡rY: ttepørt
Start: 7/27/2002
Rig Release: 8/11/2002
Rig Number: 141
- '. - .'
. ,:' , . -. ~ ,,' , :'. - - . ' :' . - -,.' - .
HoUrs. ...Tas~'::~:~,~'.i~.FY.T.;~'Phase.r. .',
MPS-03
MPS-Q3
DRILL +COMPLETE
DOYON
DOYON 141
1.00 RIGD P
0.50 RIGD P
4.50 RIGD P
COMP
COMP
COMP
06:00 - 07:00 1.00 RIGD P COMP
07:00 - 08:00 1.00 RIGD P COMP
08:00 - 10:00 2.00 RIGD P COMP
10:00 - 11 :00
11 :00 - 17:00
17:00 - 18:00
1.00 RIGD P
6.00 RIGD P
COMP
COMP
1.00 RIGD P
Spud Date: 7/28/2002
End:
.' .
. peScriptionof Operations
, .
FOR 10 MINS
PULL lWC
CIRCULATE & HEAT 9.2 COMPLETION FLUID TO 100+
DEGREE'S TO SET PACKER - ADDED 25 GALS PER 100
BBLS CORRISION INHIBITOR - SPOTTED ON BACK SIDE
OF TUBING
DROP BALL- PRESSURE UP ON TUBING TO 4000 PSI TO
SET PACKER - HOLD FOR 30 MINS - BLEED PRESSURE
TO 2500
WITH 2500 PSI ON TUBING - PRESSURE UP TO 4500 PSI
ON ANNULUS - HOLD PRESSURE FOR 30 MINS ON
ANNULUS
BLEED PRESSURE DOWN ON TUBING - SHEAR RP VAlVE
- BLEED ALL PRESURE OFF BOTH TUBING I ANNULUS TO
HB&R - PUMP 33 BBLS DIESEL IN ANNULUS WITH HB&R -
SUCK BACK 2 BBLS WITH HB&R - SHUT IN WELL - RIG
DOWN HB&R - U-TUBE WELL
SET BPV - SECURE WELL
CLEAN - ROCK WASHER - PITS PREPARE LOCATION TO
MOVE RIG TO MPS-311- LEVEL LOCATION - MOVE DIRT
FROM MPS-33 CELLAR - MOVE EQUIPMENT FOR RIG
MOVE - SUCK OUT WELL CELLARS WITH SUPER SUCKER
COMP CUT DRILLING LINE - SERVICE TOP DRIVE AND BLOCKS -
RELEASE RIG @ 18:00 HRS
Printed: 8112/2002 2:52:35 PM
Õ?Od-I'/7
26-Aug-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-03L 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 6,913.121 MD
Window I Kickoff Survey 6,943.00 I MD (if applicable)
Projected Survey: 10,260.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment( s)
AUG 27 2002
Alaska Oß & Gas Cons. Commission
Anchorage
()
BP EXPLORA TION (ALASKA) IN~~
. ~)j
lþ~
Milne Point Unit . ~'
BPXA
Milne Point MPS, Slot MPS-03
MPS-03L 1
Job No. AKZZ22127, Surveyed: 8 August, 2002
SURVEY REPORT
19 August, 2002
Your Ref: API 500292310560
Surface Coordinates: 6000037.00 N, 566047.74 E (700 24' 37.9348" N, 1490 27' 43.8689" W)
Kelly Bushing: 66.20ft above Mean Sea Level
SPI!!.r'r"Y--SUI1
bAIL LING seAVICÉS
A Halliburton Company
Survey Ref: svy10167
Sperry-Sun Drilling Services .
Survey Report for MPS-03L 1
Your Ref: API 500292310560 D~~
Job No. AKZZ22127, Surveyed: 8 August, 2002
BP EXPLORATION (ALASKA) INC. ~ t¡ BPXA
Milne Point Unit . ïr~oint MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Dogleg Vertical £'
Depth Incl. Azim. Depth Depth Northlngs Eastings Northings Eastings Rate Section Com t
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r/1 OOft)
6913.12 69.230 179.090 4094.09 4160.29 584.37 N 3759.01 E 6000654.59 N 569801.44 E 2625.33 Tie On Point
6943.00 70.800 179.100 4104.30 4170.50 556.30 N 3759.46 E 6000626.52 N 569802.13 E 5.254 2642.78 Window Point
6973.11 73.910 179.500 4113.43 4179.63 527.61 N 3759.81 E 6000597.84 N 569802.73 E 10.406 2660.53
7017.85 80.230 180.080 4123.43 4189.63 484.02 N 3759.96 E 6000554.26 N 569803.28 E 14.182 2687.21
7065.98 87.230 180.680 4128.69 4194.89 436.21 N 3759.65 E 6000506.44 N 569803.38 E 14.597 2716.07
7110.22 92.710 181.220 4128.71 4194.91 392.00 N 3758.91 E 6000462.22 N 569803.04 E 12.447 2742.42
7158.18 91.290 181.800 4127.04 4193.24 344.08 N 3757.65 E 6000414.30 N 569802.20 E 3.198 2770.61
7205.48 91.290 182.380 4125.97 4192.17 296.83 N 3755.92 E 6000367.03 N 569800.89 E 1.226 2798.02
7253.10 90.920 182.960 4125.05 4191.25 249.27 N 3753.71 E 6000319.45 N 569799.10 E 1.445 2825.23
7298.82 89.380 183.520 4124.93 4191.13 203.62 N 3751.12 E 6000273.79 N 569796.92 E 3.584 2850.98
7345.35 90.860 183.770 4124.84 4191.04 157.19 N 3748.16 E 6000227.33 N 569794.37 E 3.226 2876.92
7391.22 90.920 183.720 4124.12 4190.32 111.42 N 3745.17 E 6000181.54 N 569791.78 E 0.170 2902.42
7438.84 90.370 182.770 4123.59 4189.79 63.88 N 3742.47 E 6000133.98 N 569789.50 E 2.305 2929.24
7484.23 90.430 182.630 4123.27 4189.47 18.54 N 3740.34 E 6000088.62 N 569787.77 E 0.336 2955.16
7534.26 90.000 181.360 4123.08 4189.28 31.45 S 3738.59 E 6000038.61 N 569786.47 E 2.680 2984.23
7578.20 90.120. 180.770 4123.04 4189.24 75.39 S 3737.78 E 5999994.67 N 569786.04 E 1.370 3010.34
7627.23 90.230 180.470 4122.89 4189.09 124.41 S 3737.25 E 5999945.64 N 569785.94 E 0.652 3039.78
7671.94 90.250 179.790 4122.70 4188.90 169.12 S 3737.15 E 5999900.93 N 569786.23 E 1.522 3066.94 ~
7719.90 90.620 179.210 4122.34 4188.54 217.08 S 3737.56 E 5999852.98 N 569787.08 E 1.434 3096.48
7765.39 90.990 179.460 4121.70 4187.90 262.56 S 3738.09 E 5999807.51 N 569788.01 E 0.982 3124.60
7813.73 93.020 179.810 4120.01 4186.21 310.87 S 3738.40 E 5999759.20 N 569788.74 E 4.261 3154.27
7859.41 92.950 178.960 4117.63 4183.83 356.48 S 3138.89 E 5999713.59 N 569789.64 E 1.865 3182.44
7908.49 93.200 178.600 4114.99 4181.19 405.48 S 3739.93 E 5999664.61 N 569791.11 E 0.892 3213.11
7952.61 93.330 178.820 4112.48 4178.68 449.52 S 3740.92 E 5999620.58 N 569792.49 E 0.578 3240.72
8000.79 93.450 178.450 4109.63 4175.83 497.60 S 3742.07 E 5999572.51 N 569794.06 E 0.806 3270.91
8046.24 93.820 177.690 4106.75 4172.95 542.93 S 3743.60 E 5999527.19 N 569795.99 E 1.857 3299.74
8094.12 92.650 178.090 4104.05 4170.25 590.70 S 3745.36 E 5999479.44 N 569798.17 E 2.582 3330.23
8140.00 90.550 179.950 4102.77 4168.97 636.55 S 3746.14 E 5999433.60 N 569799.36 E 6.113 3358.78
8188.43 90.550 178.710 4102.30 4168.50 684.98 S 3746.71 E 5999385.18 N 569800.36 E 2.560 3388.72
8233.01 90.740 178.260 4101.80 4168.00 729.54 S 3747.89 E 5999340.63 N 569801.93 E 1.096 3416.80
19 August, 2002 - 9:59
Page 2 0(5
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report for MPS-03L 1
Your Ref: API 500292310560
Job No. AKZZ22127, Surveyed: 8 August, 2002 DI$
'
BP EXPLORATION (ALASKA) INC. . .~4 BPXA
Milne Point Unit .' Q.J5i1ne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertic I ~
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Sectlon.l . e t
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) ., . .
8279.27 90.490 177.370 4101.30 4167.50 775.76 S 3749.65 E 5999294.43 N 569804.10 E 1.998 3446.35
8326.15 90.860 181.400 4100.75 4166.95 822.63 S 3750.15 E 5999247.57 N 569805.02 E 8.632 3475.30
8374.71 91.110 181.740 4099.92 4166.12 871.16S 3748.82 E 5999199.02 N 569804.12 E 0.869 3503.80
8418.65 91.290 180.620 4099.00 4165.20 915.08 S 3747.92 E 5999155.10 N 569803.60 E 2.581 3529.84
8467.38 91.480 180.570 4097.82 4164.02 963.79 S 3747.41 E 5999106.38 N 569803.53 E 0.403 3559.11
8512.10 90.370 182.310 4097.10 4163.30 1008.49 S 3746.29 E 5999061.68 N 569802.80 E 4.615 3585.44
8561.21 90.430 182.440 4096.75 4162.95 1057.56 S 3744.25 E 5999012.59 N 569801.20 E 0.292 3613.71
8604.89 90.740 182.330 4096.31 4162.51 1101.20 S 3742.44 E 5998968.94 N 569799.77 E 0.753 3638.85
8653.99 90.740 181.760 4095.67 4161.87 1150.26 S 3740.68 E 5998919.86 N 569798.45 E 1.161 3667.35
8698.77 89.820 183.580 4095.45 4161.65 1194.99 S 3738.60 E 5998875.12 N 569796.76 E 4.554 3692.94
8746.83 89.690 182.630 4095.66 4161.86 1242.98 S 3735.99 E 5998827.11 N 569794.58 E 1.995 3720.10
8792.34 89.880 184.520 4095.83 4162.03 1288.40 S 3733.16 E 5998781.66 N 569792.14 E 4.174 3745.52
8839.06 90.250 184.950 4095.78 4161.98 1334.96 S 3729.30 E 5998735.07 N 569788.70 E 1.214 3770.82
8885.34 90.980 185.890 4095.28 4161.48 1381.03 S 3724.93 E 5998688.97 N 569784.74 E 2.572 3795.41
8933.45 90.800 185.890 4094.53 4160.73 1428.88 S 3719.99 E 5998641.07 N 569780.22 E 0.374 3820.64
8978.87 91.170 186.920 4093.75 4159.95 1474.01 S 3714.93 E 5998595.90 N 569775.56 E 2.409 3844.11
9026.42 89.320 186.900 4093.55 4159.75 1521.21 S 3709.21 E 5998548.65 N 569770.25 E 3.891 3868.33
9072.41 89.200 186.850 4094.14 4160.34 1566.87 S 3703.70 E 5998502.95 N 569765.15 E 0.283 3891 .77
9118.43 89.380 186.870 4094.71 4160.91 1612.55 S 3698.21 E 5998457.21 N 569760.06 E 0.394 3915.24
9165.69 89.630 186.490 4095.12 4161 .32 1659.49 S 3692.71 E 5998410.23 N 569754.98 E 0.962 3939.47
9214.96 88.950 186.360 4095.73 4161.93 1708.45 S 3687.20 E 5998361.23 N 569749.90 E 1 .405 3964.91
9259.96 88.340 186.600 4096.80 4163.00 1753.15S 3682.12 E 5998316.48 N 569745.22 E 1.457 3988.11
9307.65 89.010 184.720 4097.90 4164.10 1800.59 S 3677.42 E 5998269.00 N 569740.94 E 4.184 4013.28
9353.58 89.260 184.890 4098.59 4164.79 1846.35 S 3673.57 E 5998223.21 N 569737.49 E 0.658 4038.10
9400.46 88.890 184.700 4099.35 4165.55 1893.06 S 3669.65 E 5998176.46 N 569733.99 E 0.887 4063.45
9446.86 89.390 185.750 4100.05 4166.25 1939.26 S 3665.43 E 5998130.23 N 569730.17 E 2.506 4088.24
9498.83 92.400 187.070 4099.23 4165.43 1990.90 S 3659.63 E 5998078.55 N 569724.83 E 6.324 4115.08
9538.94 92.150 187.1 00 4097.64 4163.84 2030.67 S 3654.68 E 5998038.73 N 569720.24 E 0.628 4135.39
9587.99 86.800 182.080 4098.09 4164.29 2079.52 S 3650.76 E 5997989.84 N 569716.75 E 14.954 4162.04
9633.37 85.010 182.170 4101.33 4167.53 2124.76 S 3649.08 E 5997944.60 N 569715.47 E 3.949 4188.26
19 August, 2002 - 9:59
Page 3 0'5
DrillQllest 2.00.08.005
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Measured Sub-Sea Vertical
Depth Incl. Azlm. Depth Depth
(ft) (ft) (ft)
9682.59 82.970 182.790 4106.49 4172.69
9726.83 81.350 183.060 4112.52 4178.72
9776.36 81.420 182.640 4119.94 4186.14
9820.88 81 .650 182.790 4126.49 4192.69
9870.15 85.620 184.140 4131.95 4198.15
9914.23 91.050 185.510 4133.23 4199.43
9964.81 90.430 183.970 4132.58 4198.78
10007.31 89.020 183.700 4132.79 4198.99
10055.88 88.400 183.280 4133.88 4200.08
10101.30 88.710 183.980 4135.02 4201.22
10149.39 94.500 189.440 4133.68 4199.88
10194.23 93.450 189.740 4130.57 4196.77
10260.00 93.450 189.740 4126.61 4192.81
Sperry-Sun Drilling Services
Survey Report for MPS-03L 1
Your Ref: API 500292310560
Job No. AKZZ22127, Surveyed: 8 August, 2002
Local Coordinates
Northlngs Eastlngs
(ft) (ft)
Global Coordinates
Northlngs Eastlngs
(ft) (ft)
.
()..
~,("..
^Q BPXA
~Jf~pOint MPS
rt'cal ~~
Dogleg Va I Co~:nt
Section
Rate
r/100ft)
2173.66 S 3646.96 E 5997895.68 N 569713.78 E 4.330 4216.36
2217.42 S 3644.73 E 5997851.89 N 569711.93 E 3.711 4241.25
2266.33 S 3642.29 E 5997802.96 N 569709.93 E 0.850 4269.11
2310.32 S 3640.21 E 5997758.96 N 569708.24 E 0.615 4294.24
2359.19 S 3637.25 E 5997710.07 N 569705.71 E 8.505 4321.66
2403.07 S 3633.54 E 5997666.15 N 569702.39 E 12.704 4345.45
2453.47 S 3629.36 E 5997615.72 N 569698.66 E 3.282 4372.84
2495.88 S 3626.52 E 5997573.29 N 569696.19 E 3.378 4396.41
2544.35 S 3623.56 E 5997524.80 N 569693.66 E 1.542 4423.59
2589.66 S 3620.69 E 5997479.46 N 569691 .19 E 1.685 4448.91
2637.36 S 3615.08 E 5997431.71 N 569686.00 E 16.543 4473.51
2681.47 S 3607.63 E 5997387.54 N 569678.94 E 2.435 4494.47
2746.17 S 3596.52 E 5997322.74 N 569668.40 E 0.000 4525.07 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 127.524° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 10260.00ft.,
The Bottom Hole Displacement is 4525.09ft., in the Direction of 127.364° (True).
19 August, 2002 - 9:59
Page 4 0'5
DrillQuest 2.00.08.005
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Comments
-"_or'
Measured
Depth
(ft)
6913.12
6943.00
10260.00
Sperry-Sun Drilling Services
Survey Report for MPS-03L 1
Your Ref: AP/500292310560
Job No. AKZZ22127, Surveyed: 8 August, 2002
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
4160.29
4170.50
4192.81
584.37 N
556.30 N
2746.17 S
Survey tool program for MPS-03L 1
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
0.00
177.00
19 August, 2002 - 9:59
0.00 177.00
176.99 10260.00
Comment
3759.01 E
3759.46 E
3596.52 E
Tie On Point
Window Point
Projected Survey
Survey Tool Description
176.99 Tolerable Gyro (MPS-03)
4192.81 AK-6 BP _IFR-AK (MPS-03)
Page 5 0'5
ð
~.
~..
/tø-L::: BPXA
MiI~oint MPS
.
~~~
DrillQuest 2.00.08.005
a ~-)L/7
26-Aug-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-03L 1 MWD
Deaf Deaf Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 6,913.12' MD
Window I Kickoff Survey 6,943.00' MD (if applicable)
Projected Survey: 10,260.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment(s)
AUG 27 2002
Alaska Oi1 & Gas Cons. Commission
Anchorage
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
Milne Point MPS, Slot MPS-03
MPS-03L 1 MWD
Job No. AKMW22127, Surveyed: 8 August, 2002
~~"'-
SURVEY REPORT
19 August, 2002
Your Ref: API 500292310560
Surface Coordinates: 6000037.00 N, 566047.74 E (70024' 37.9348" N, 149027' 43.8689" W)
Kelly Bushing: 66.20ft above Mean Sea Level
5p11r'r'V--IIUI1
OFtf L LING SS.AVlces
A Halliburton Company
Survey Ref: 5vy10168
Sperry-Sun Drilling Services .
Survey Report for MPS-03L 1 MWD
Your Ref: API 500292310560
Job No. AKMW22127, Surveyed: 8 August, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
6913.12 69.230 179.340 4094.09 4160.29 618.57 N 3753.56 E 6000688.73 N 569795.68 E 2600.18 Tie On Point
6943.00 70.800 179.100 4104.30 4170.50 590.49 N 3753.94 E 6000660.66 N 569796.31 E 5.308 2617.58 Window Point
6973.11 73.910 179.500 4113.43 4179.63 561.80 N 3754.29 E 6000631.98 N 569796.91 E 10.406 2635.33
7017.85 80.230 180.080 4123.44 4189.64 518.22 N 3754.45 E 6000588.40 N 569797.46 E 14.182 2662.00
7065.98 87.230 180.680 4128.69 4194.89 470.41 N 3754.13 E 6000540.59 N 569797.56 E 14.597 2690.87
7110.22 92.710 181.220 4128.71 4194.91 426.19 N 3753.39 E 6000496.36 N 569797.22 E 12.447 2717.22
7158.18 91 .290 181.800 4127.04 4193.24 378.28 N 3752.13 E 6000448.44 N 569796.38 E 3.198 2745.40
7205.48 91.290 182.380 4125.97 4192.17 331.02 N 3750.41 E 6000401.17 N 569795.07 E 1.226 2772.82
7253.10 90.920 182.960 4125.06 4191.26 283.46 N 3748.19 E 6000353.60 N 569793.28 E 1 .445 2800.03
7298.82 89.380 183.520 4124.94 4191.14 237.82 N 3745.61 E 6000307.93 N 569791.10 E 3.584 2825.78
7345.35 90.860 184.100 4124.84 4191.04 191.39 N 3742.51 E 6000261.48 N 569788.41 E 3.416 2851.61
7391.22 90.920 184.030 4124.13 4190.33 145.64 N 3739.26 E 6000215.70 N 569785.57 E 0.201 2876.89
7438.84 90.370 183.040 4123.59 4189.79 98.12 N 3736.33 E 6000168.15 N 569783.05 E 2.378 2903.51
7484.23 90.430 183.160 4123.27 4189.47 52.79 N 3733.87 E 6000122.81 N 569781.00 E 0.296 2929.17
7534.26 90.000 181.780 4123.09 4189.29 2.81 N 3731.72 E 6000072.81 N 569779.28 E 2.889 2957.90
7578.20 90.120 181 . 160 4123.04 4189.24 41.11 S 3730.59 E 6000028.88 N 569778.55 E 1.437 2983.77
7627.23 90.230 180.890 4122.89 4189.09 90.14 S 3729.71 E 5999979.85 N 569778.10 E 0.595 3012.93
7671.94 90.250 179.990 4122.70 4188.90 134.84 S 3729.37 E 5999935.14 N 569778.15 E 2.013 3039.89 -
7719.90 90.620 179.360 4122.34 4188.54 182.80 S 3729.64 E 5999887.19 N 569778.85 E 1.523 3069.31
7765.39 90.990 179.750 4121.70 4187.90 228.29 S 3729.99 E 5999841.71 N 569779.61 E 1.182 3097.30
7813.73 93.020 180.130 4120.01 4186.21 276.59 S 3730.04 E 5999793.40 N 569780.08 E 4.272 3126.76
7859.41 92.950 179.400 4117.63 4183.83 322.21 S 3730.23 E 5999747.79 N 569780.67 E 1.603 3154.70
7908.49 93.200 179.030 4115.00 4181.20 371.21 S 3730.90 E 5999698.79 N 569781.78 E 0.909 3185.08
7952.61 93.330 179.250 4112.48 4178.68 415.26 S 3731.56 E 5999654.76 N 569782.83 E 0.578 3212.43
8000.79 93.450 178.890 4109.63 4175.83 463.35 S 3732.34 E 5999606.68 N 569784.04 E 0.786 3242.34
8046.24 93.820 178.440 4106.75 4172.95 508.69 S 3733.40 E 5999561.34 N 569785.49 E 1.280 3270.80
8094.12 92.650 178.940 4104.05 4170.25 556.48 S 3734.49 E 5999513.56 N 569787.01 E 2.657 3300.77
8140.00 90.550 180.220 4102.77 4168.97 602.34 S 3734.83 E 5999467.71 N 569787.75 E 5.360 3328.97
8188.43 90.550 179.290 4102.31 4168.51 650.77 S 3735.04 E 5999419.29 N 569788.39 E 1.920 3358.63
8233.01 90.740 178.690 4101.80 4168.00 695.34 S 3735.82 E 5999374.73 N 569789.57 E 1.412 3386.40
~.------------_.~~._---
19 August, 2002 - 10:02
Page 20f5
DrillQlJest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report for MPS-03L 1 MWD
Your Ref: AP/500292310560
Job No. AKMW22127, Surveyed: 8 August, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
8279.27 90.490 177.990 4101.31 4167.51 741.58 S 3737.16 E 5999328.50 N 569791.31 E 1.607 3415.63
8326.15 90.860 181.860 4100.75 4166.95 788.44 S 3737.22 E 5999281.64 N 569791.79 E 8.292 3444.22
8374.71 91.110 182.410 4099.92 4166.12 836.96 S 3735.42 E 5999233.10 N 569790.41 E 1.244 3472.34
8418.65 91.290 181.270 4099.00 4165.20 880.87 S 3734.00 E 5999189.19 N 569789.39 E 2.626 3497.96
8467.38 91.480 180.990 4097.82 4164.02 929.58 S 3733.04 E 5999140.47 N 569788.86 E 0.694 3526.87
8512.10 90.370 182.660 4097.10 4163.30 974.26 S 3731.62 E 5999095.77 N 569787.83 E 4.484 3552.96
8561.21 90.430 182.970 4096.76 4162.96 1023.31 S 3729.21 E 5999046.70 N 569785.85 E 0.643 3580.92
8604.89 90.740 182.780 4096.31 4162.51 1066.94 S 3727.02 E 5999003.06 N 569784.05 E 0.832 3605.76
8653.99 90.740 182.000 4095.68 4161.88 1115.99 S 3724.97 E 5998953.99 N 569782.43 E 1.588 3634.01
8698.77 89.820 183.760 4095.46 4161.66 1160.71 S 3722.72 E 5998909.26 N 569780.58 E 4.435 3659.46
8746.83 89.690 183.170 4095.66 4161.86 1208.68 S 3719.82 E 5998861.26 N 569778.10 E 1 .257 3686.38
8792.34 89.880 184.950 4095.83 4162.03 1254.08 S 3716.59 E 5998815.84 N 569775.28 E 3.933 3711.47
8839.06 90.250 185.100 4095.78 4161.98 1300.62 S 3712.50 E 5998769.27 N 569771.60 E 0.855 3736.58
8885.34 90.980 186.350 4095.28 4161.48 1346.66 S 3707.88 E 5998723.18 N 569767.39 E 3.128 3760.96
8933.45 90.800 186.380 4094.54 4160.74 1394.47 S 3702.55 E 5998675.33 N 569762.48 E 0.379 3785.85
8978.87 91.170 187.480 4093.76 4159.96 1439.55 S 3697.07 E 5998630.20 N 569757.40 E 2.555 3808.96
9026.42 89.320 187.480 4093.55 4159.75 1486.69 S 3690.88 E 5998583.01 N 569751.63 E 3.891 3832.77
9072.41 89.200 187.190 4094.15 4160.35 1532.30 S 3685;01 E 5998537.35 N 569746.16 E 0.682 3855.89
9118.43 89.380 187.300 4094.72 4160.92 1577.95 S 3679.21 E 5998491.65 N 569740.76 E 0.458 3879.09
9165.69 89.630 186.630 4095.13 4161.33 1624.86 S 3673.48 E 5998444.69 N 569735.44 E 1.513 3903.12
9214.96 88.950 186.390 4095.74 4161.94 1673.81 S 3667.89 E 5998395.69 N 569730.29 E 1 .464 3928.51
9259.96 88.340 186.630 4096.80 4163.00 1718.51 S 3662.79 E 5998350.95 N 569725.59 E 1.457 3951.68
9307.65 89.010 184.890 4097.90 4164.10 1765.94 S 3658.01 E 5998303.48 N 569721.22 E 3.909 3976.78
9353.58 89.260 184.710 4098.60 4164.80 1811.70S 3654.16 E 5998257.68 N 569717.78 E 0.671 4001.61
9400.46 88.890 184.650 4099.35 4165.55 1858.42 S 3650.34 E 5998210.93 N 569714.37 E 0.800 4027.03
9446.86 89.390 186.040 4100.05 4166.25 1904.61 S 3646.02 E 5998164.70 N 569710.46 E 3.183 4051.74
9498.83 92.400 187.130 4099.24 4165.44 1956.23 S 3640.06 E 5998113.04 N 569704.96 E 6.160 4078.45
9538.94 92.150 187.070 4097.65 4163.85 1996.00 S 3635.11 E 5998073.23 N 569700.36 E 0.641 4098.75
9587.99 86.800 182.710 4098.10 4164.30 2044.84 S 3630.93 E 5998024.35 N 569696.61 E 14.068 4125.18
9633.37 85.010 182.630 4101.34 4167.54 2090.05 S 3628.82 E 5997979.12 N 569694.90 E 3.948 4151.05
19 August, 2002 - 10:02
Page 3 0'5
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report for MPS-03L 1 MWD
Your Ref: API 500292310560
Job No. AKMW22127, Surveyed: 8 August, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit Milne Point MPS
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
9682.59 82.970 183.400 4106.49 4172.69 2138.93 S 3626.24 E 5997930.22 N 569692.76 E 4.427 4178.78 """"""
9726.83 81.350 183.360 4112.52 4178.72 2182.68 S 3623.66 E 5997886.45 N 569690.56 E 3.663 4203.38
9776.36 81.420 183.020 4119.94 4186.14 2231.57 S 3620.94 E 5997837.53 N 569688.27 E 0.693 4231.00
9820.88 81.650 183.100 4126.50 4192.70 2275.55 S 3618.59 E 5997793.54 N 569686.31 E 0.546 4255.91
9870.15 85.620 184.270 4131.96 4198.16 2324.40 S 3615.44 E 5997744.66 N 569683.59 E 8.396 4283.17
9914.23 91.050 185.680 4133.24 4199.44 2368.28 S 3611.62 E 5997700.75 N 569680.16 E 12.726 4306.87
9964.81 90.430 184.910 4132.58 4198.78 2418.64 S 3606.95 E 5997650.35 N 569675.94 E 1.954 4333.84
10007.31 89.020 184.490 4132.79 41 98.99 2460.99 S 3603.47 E 5997607.97 N 569672.83 E 3.462 4356.88
10055.88 88.400 183.670 4133.88 4200.08 2509.43 S 3600.01 E 5997559.51 N 569669.80 E 2.116 4383.64
10101.30 88.71 0 184.260 4135.03 4201.23 2554.72 S 3596.87 E 5997514.18 N 569667.06 E 1.467 4408.74
10149.39 94.500 189.850 4133.68 4199.88 2602.39 S 3590.98 E 5997466.47 N 569661.59 E 16.729 4433.10
10194.23 93.450 190.280 4130.57 4196.77 2646.43 S 3583.16 E 5997422.36 N 569654.16 E 2.530 4453.72
10260.00 93.450 190.280 4126.61 4192.81 2711.03 S 3571.44 E 5997357.66 N 569643.02 E 0.000 4483.78 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 127.524° (True).
~"'-
Based upon Minimum Curvature type calculations, at a Measured Depth of 10260.00ft.,
The Bottom Hole Displacement is 4483.85ft., in the Direction of 127.202° (True).
19 August, 2002 - 10:02
Page 4 0'5
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for MPS-03L 1 MWD
Your Ref: API 500292310560
Job No. AKMW22127, Surveyed: 8 August, 2002
.
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
BPXA
Milne Point MPS
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
6913.12
6943.00
10260.00
4160.29
4170.50
4192.81
618.57 N
590.49 N
2711.03 S
3753.56 E
3753.94 E
3571.44 E
Tie On Point
Window Point
Projected Survey
Survey tool program for MPS-03L 1 MWD
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
Survey Tool Description
0.00
177.00
0.00 177.00
176.99 10260.00
176.99 Tolerable Gyro (MPS-03 MWD)
4192.81 MWD Magnetic (MPS-03 MWD)
19 August, 2002 - 10:02
Page 5 0'5
DriflQuest 2.00.08.005
AI/ASIiA OIL AND GAS
CONSERVATION COMMISSION
If
/
TONY KNOWLES, GOVERNOR
~7~~! :} !Æ~!Æ~A!Æ
333 W. "JTH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519-6612
Re:
Milne Point Unit 11PS-03L1
BP Exploration (Alaska), Inc.
Permit No: 202-147
Surface Location: 3367' NSL, 4743' WEL, Sec. 07, T12N, RIlE, UM
Bottomhole Location: 611' NSL, 1167', WEL, Sec. 07, T12N, RIlE, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to drill the above development well.
The permit to drill does not exempt you from obtaining additional permits or approvals requITed by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
The permit is for a new wellbore segment of existing well MPU MPS 03, Permit No 202-145,
API 50-029-23105. Production should continue to be reported as a function of the original API
number stated above.
Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the
surface casing shoe must be given so that a representative of the Commission may witness the
test. Notice may be given by contacting the Commission petroleum field inspector on the North
Slope pager at 659-3607. .
Sincerely,
c~~)::r
Chair
BY ORDER OF THE COMMISSION
DATED thisLifbday of July, 2002
cc:
Department of Fish & Game, Habitat Section w/oencl.
Department of Environmental Conservation w/o encl.
1 a. Type of work 0 Drill II Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3367' NSL, 4743' WEL, SEC. 07, T12N, R11E UM (As Staked)
At top of productive interval
4229' NSL, 1083' WEL, SEC. 07, T12N, R11E, UM (OA)
At total depth
611' NSL, 1167'WEL, SEC. 07, T12N, R11E, UM (OA)
12. Distance to nearest property line 13. Distance to nearest well
ADL 047446,611' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 6778' MD Maximum Hole Angle
18. Casin~ Program Specifications
$Ize
Hole CasinQ WeiQht Grade CouplinQ
6-1/8"" 4-1/2" 12.7# L-80 BTC
STATE OF ALASKA ./c ,
ALASKA t - AND GAS CONSERVATION COMMl..,ION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well IJ Exploratory 0 Stratigraphic Test II Development Oil
IJ Service IJ Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Planned KBE = 68' Milne Point Unit / Schrader
6. Property Designation Bluff
ADL 380110
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPS-03L 1 /'
9. Approximate spud date
07/23/02 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 10450' MD I 4201' TVD
0 17. Anticipated pressure {ser20 AAC 25.035 (e) (2)}
91 Maximum surface 1496 psig, At total depth (TVD) 4278' / 1924 psig
Setting Depth
T9P Botom Quantity of Cement
I enQth Mt) TVn MD TVD (include staQe data)
3672 6778' 4208' 10450' 4201' Uncemented Slotted Liner
UG~/"(OL
~~U~
11. Type Bond (See 20 MC 25.025)
Number 2S 100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10463 feet
4261 feet
feet
feet
Plugs (measured)
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
82'
7016'
20"
7-5/8"
260 sx Arctic Set (Approx.)
639 sx PF 'L', 281 Class 'G'
112'
112'
3547'
4-1/2"
Uncemented Slotted Liner
6916' - 10463'
4227' - 4261'
r~.E(:EI
ED
Perforation depth: measured
II Ii "'¡ n <10-°2
v.....:... '.... L 1.i
true vertical
20. Attachments
Alaska OU & Gas GOriS. CommiSSion
. Filing Fee IJ Property Plat IJ BOP Sketch 0 DivelM*§ð . Drilling Program
II Drilling Fluid Program IJ Time vs Depth Plot 0 Refraction Analysis IJ Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer NameINumber: Steve Campbell, 564-4401 Prepared By Name/Number: Sondra Stewman, 564-4750
21. I hereby certify that the for. ing is true and c¡rrect to the best of my knowledge '7 J
O--~\.. Title Senior Drilling Engineer Date 7/ t/ 9/0 c2.
Permit Number
..2.0.2-/7<7
Conditions of Approval:
API Number
50- ðZ 9 - 231ð S--60
Samples Required 0 Yes 181 No
Hydrogen Sulfide Measures 0 Yes ßI No
Required Working Pressure for BOPE 0 2K 0 3K
Other:~,~ + iSOt) E3 ~ ¥Q{)o fI c;l 4
Ongtnsl Signed By Commissioner
Cammy Qechsli 1 ayaor ~
,
A)p~rO al.Qate See cover letter
1 I ~) f;).... for other requirements
Mud Log R quired 0 Yes .ag No
Directional Survey Required EYes 0 No
D4K D5K D10K D15K 0 3.5K psi for CTU
Approved By
Form 10-401 Rev. 12-01-85
by order of
the commission
L~
Date <1 I!;¡ /; ~
Submi~~ Triplicate
Milne Po~c .VlPS-03 Well Permit
(
IWell Name: I MPS-03 L 1
Drill and Complete Plan Summary
I Type of Well (service / producer / injector): I Multi Lateral Producer "OA" & "DB"
Surface Location:
Target Location:
TOP "OA"
Target Location:
BHL "OA" Well TD
Target Location:
TOP "OB"
Target Location:
BHL "OB" Well TD
TOTAL DEPTH
19111 FNL, (336T FSL), 47431 FEL, (381 FWL), SEC. 7, T12N, R11E
E=566047.81 N=6000037.19
10491 FNL, (42291 FSL), 1083' FEL, (36931 FWL), SEC. 7, T12N, R11 E
E=569695.71 N=6000932.69 Z=4222' TVD
46681 FNL, (6111 FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E
E=569659.00 N=5997314.00 Z=4201' TVD
1236' FNL, (40431 FSL), 1029' FEL, (37481 FWL), SEC. 7, T12N, R11 E
E=569752.04 N=6000746.67 Z=4278' TVD
46681 FNL, (6111 FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E
E=569659.00 N=5997314.00 Z=4261' TVD
46681 FNL, (6111 FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E
E=569659.00 N=5997314.00 Z=4261' TVD
I RiQ: I Doyon 141 1
I OperatinQ days to complete: 113 I
1 Max Inc: 191 I 1 KOP: I :67781 I KBE: 168 I
I Well DesiQn (conventional, slimhole, etc.): I Conventional Grass Roots ML Producer I
I
I AFE Number: 1
I Estimated Start Date: 123 Jul2002
1 MD: 110450 1 I TVD: 14201 1
I Objective: I Schrader DB Sand
Mud Program:
9-7/8" Surface Hole Mud Properties:
Density (ppg) Funnel visc YP
HTHP
Spud - LSND Freshwater Mud
pH API Fi Itrate LG
Solids
< 6.5
8.6 - 9.20
75 - 150
N/A
<8
9.0-9.5
25 - 60
KCL-CaC03 Flow Pro
pH API Filtrate LG
Solids
<12
6-1/8" Production Hole Mud Properties:
Density (ppg) Funnel visc YP HTHP
8.6 - 9.20 40 55 22 - 27 <10 8.0 - 8.5 4 - 6
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR.
1
(
Milne Po(i' 'APS-03 Well Permit
Cement Program:
Casing Size 17.625-in 29.7-lb/ft L-80 BTC Intermediate Casing
B . 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below
aSlS
permafrost
Pump lead to surface before switching to tail. Have additional 300-sx lead cement on location.
Total Cement
Volume: 772-bbl
Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg
50 bbl of Viscosified Spacer (Alpha Design) weighted to 10.50
Spacer
ppg
Lead 639 sx 10.7Ib/gal Class L - 4.15 cuft/sx (cement to surface)
281-sx 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at 5938'
Tail
Temp BHST ~ 80°F from SOR, BHCT 85° F estimated by Halliburton
Evaluation Program:
9 7/8" Hole Section:
Open Hole:
Cased Hole:
6-1/8" Hole section:
Open Hole:
MWD/GR/RES IFR/CASANDRA
N/a
MWD/GR/RES ABI/IFR/CASANDRA
Formation Markers:
Formation Tops MDrkb TVDrkb . Estimated EMW
(ft) (ft) Pore Pressure (pSI) (lb/gal)*
Base Permafrost 1,936 1,816 816 8.65
Top Ugnu 5441 3,491 1570 8.65
Top Ugnu M NA
Bottom U gnu NA
NA 6438 4048 1820 8.65
NB 6507 4113 1850 8.65
NC 6577 4139 1861 8.65
NE 6613 4152 1867 8.65
NF 6739 4195 1886 8.65
Top OA 6818 4222 1899 8.65
Base OA 6910 4250 1911 8.65
Top OB 7021 4278 1924 8.65
TD 10463 4261 1916 8.65
2
(!
Casingrrubing Program:
Milne po~. V1PS-03 Well Permit
Hole Csgl WtlFt Grade Conn Length Top Bottom
Size Tbg O.D. MD I TVDrkb MD I TVDrkb
42-in 20- in * 92# H-40 Welded 80-ft 30-ft 112-ft / 112-ft
9.875-in 7.625-in 29.7# L-80 BTC 70 16-ft O-ft 7,016-ft /
4,277-ft
6. 125-in 4.5-in 12.7# L-80 BTC 3,672-ft 6,778-ft / 4,208-ft 10,450-ft /
4,201-ft
6. 125-in 4.5-in 12.7# L-80 BTC 3,547-ft 6916-ft /4,227-ft 10,463- ft /
4,261-ft
*The 20" casing is insulated
Recommended Bit Program:
BHA Hole Depth (MD) Bit Type Nozzle/Flow
Size rate
1 9.875-in 0 - 2,000-ft Hughes MXC-1 3-15 & 1-10
2 9.875-in 2,000 - 7,016-ft Security Rotary TBD
Steerable Bit
3 6.125-in 7,016-ft - TD Security FM2643 3 -12
Well Control:
. Production hole will be drilled with a diverter.
Surface Interval
. Maximum anticipated BHP:
. Maximum surface pressure:
. Kick tolerance:
. Planned completion fluid:
1924 psi @ 4278' TVDrkb - Top of "OB"
1496 psi @ surface
(Based on BHP and a full column of gas from TD @ 0.1 psi/ft)
Diverter will be function tested. BOP's:Test annular 250 psi low
and 2500 psi high, and rams to 250 psi low and 4,000 psi high.
N/A
9.2 ppg NaCI / 6.8 ppg Diesel
. Planned BOP test pressure:
.
Drilling Hazards & Contingencies:
Hydrates
. Hydrates have not been seen on S pad, but has been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
3
Milne PO~' '~PS-03 Well Permit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
. Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation
. We do not expect losses while drilling this well.
. Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
.
It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud.
Pad Data Sheet
.
Please Read the S-Pad Data Sheet thoroughly.
Breathing
.
N/A
Hydrocarbons
.
Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
. NA
Hydrogen Sulfide
. MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
.
MPS-03 has no anti-collision issues.
4
(
DRILL & COMPLETION PROCEDURE
Milne po~ ~PS-03 Well Permit
Pre- Rig Operations
1. The 20" insulated conductor is installed
Procedure
1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe
2. Drill 9-7/8" surface hole as per directional plan.
3. Condition mud prior to 7 5/8" casing run. POOH
4. Run and cement 7 5/8" casing from TD to surface.
5. ND Diverter
6. Install FMC 11" 5m horizontal wellhead
7. N/U and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250
low and 4000 psi high
8. Drill 6-1/8" OB horizontal production hole as per directional plan.
9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing.
10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD.
a. RIH. Orient and set whipstock to place window at top of the OA interval.
b. Shear off and mill window thru 7-5/8" casing.
11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud
properties and POOH.
12. MU whipstock retrieving tool and pull whipstock
13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing
14. POOH
15. Till and displace out drilling mud with 9.2 ppg N aCl
16. POOH
17. Run in hole with 4-1/2" jet pump completion as per schematic
18. Land tubing hanger and test
19. Set BPV
20. ND BOP
21. Install and test tree
22. Pull BPV
23. Drop ball and set production packer
24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi
25. Freeze protect thru GLM
26. Install BPV and secure the well
27. RD/MO
5
("
(
BP EXPLORATION
Milne Point Unit MPS-03 & MPS-03 L 1
Field: Milne Point
Well: MPS-03
DIRECTIONAL OPEN HOLE FORMATION DEPTH
LWD LOGGING MD I TVD TOC
NONE NONE
112' 112'
Top of Lead Cement Surf Surf
Dir/GRlRES NONE
Base of Permafrost
1,936" 1,816'
Top of Tail Cement
5.938 3873
Top of N sand
6,438' 4,086'
ENG: Steve Campbell! Matthew Green
RIG: Doyon 141
MSL 39.3-ft
RKB: 68'
HOLE CASING MUD INFO
TOC SIZE SPECS PIT INFO INFORMATION
Wellhead
20" 91.5# FMC Gen 6 20" x 11- 5M
H.40 Insulated N/A
42'. Welded
KOP @ 366' MD
"
'- -.. -..-. ---.-.. -.. -..- ..--. -.. -. --.--
Dir/Res . ,
ABI/GR NONE OA sand 6,818' 4,222' ""
- -.. -..-.. -.. -.. - .. -.. -.. -.. .22:.4~<r.. ~:.221'.. ...... ....
7-5/8" Surface casing 7,016' 4,277'
- - Õi~/~; . - . . - . . - . . - .. - . . - . . - . . - . . - . . - --. -
ABI/GR NONE OB sand 7,021' 4,278'
10,463' 4,261'
- - . . - . . - . . - . . - . . - . . - . - - - . - - -1- - - - . . - . - - . - - . .
7/9/2002
6-1/8" Hole - 4-1/2", 12.6#, L-80 Slotted Liner
9-7/8"
Surface
Casing
7 5/8" 29.7#
L-80
BTC
MW = 9.2
6-1/8" Hole - 4-1/2",12.6#, L-80 Slotted Liner
MPS-03ML WBD.xls
COMPANY DETAILS
REFERENCE INFORMATION
SURVEY PROGRAM
BP Amoco
Co-ordinate (NfE) Reference: Wen Centre: Plan MPS-03, True North
Vertical (fVD) Reference: Plan MPS-03 66.20 66.20
Section (VS) Reference: User Dermed (89928N,3643. 15E)
Measured Depth Reference: Plan MPS-03 66.20 66.20
Cakulation Method: Minimum Curvature
Depth Fm Depth To Survey/Plan
6778.00 10450.81 Planned: MPS-03L1 wpOl VI
Calculation Method: Minimmn Ctnvature
Error SYslem: ISCWSA
Scan Method: Trav Cylinder North
Error Surface: Elliptical + Casing
Warning Method: Rules Based
FORMATION TOP DETAILS
No. TVDPath MDPath Fonnation
4222,20 6822.36 TSBD-OA
3600-
1
2
3
4
5
6
7
8
9
10
11
r,7 N.OO 70.00
.;1111".35 91.60
~ 11111.33 91.60
>""J.34 89.90
>' .IIJ.76 89.90
I, ," 1.32 89.90
""-11.12 90.00
1'"JII.36 91.15
1.'.11 ,.38 91.15
""J 1,75 90.11
1('J ,",81 90.11
See
MD
l'lan: MPS-03L I wpO I (Plan MPS-0311'Ian MI'S-03L 1)
Tool
MWD+IFR+MS
Date: 7/9/2002
Cre-dted By: Ken Allen
Checked:
Date:
Reviewed:
Date:
WELL DETAILS
Name
+Ni-S
I.atitude
Longiluôc Slut
+Ei-W
Northing
Easting
Plan MPS-03
61.83 -296.6g 6000037.19
566047.81 70'24'37.937N 149'27'43.867W N/A
Ine
TARGET DET AII.S
Name TVD +N/-S +Ei-W Northing ElIs1ing Shape
Togepi LI T4 420120 -2755.28 3587.31 5997314.00 569659.00 Puiot
T ogepi LI T3 4202.20 -2247.53 3623.80 5997822.00 569691.00 Point
Togepi LI TI 420620 -815.42 3745.48 5999255.00 569800.()() Point
Togepi LlPoly 4206.20 815.27 3578.88 6000884.00 569619.00 Polygon
T ogepi LI 12 420820 -1917.68 3645.72 5998152.00 569710.00 Point
MPS-03 FauJt1 426620 -2055.89 3327.46 5998011.00 569393.00 Polygon
MPS-03 FauJt2 4266.20 -196.39 3525.93 5999872.00 569575.00 Polygon
SECTION DETAILS
Azi TVD +N/-S +E/-W DLeg TFaee VSee Tafget
160.00 4208,53 899.28 3643,15 0,00 0.00 2341.50
177.19 4245.09 680.28 3686.26 12.00 39.93 2509.09
177.19 4208.88 -611.64 3749.68 0.00 0.00 3346.33
185.17 4206.20 -815.42 3745.48 4.00 101.98 3467.13 Togepi LI TI ..-...,
185.19 4206.20 -815.83 3745.44 4.00 107.20 3467.35
185.19 4208.17 -1887.98 3648.11 0.00 0.00 4043.23
184.00 4208.20 -1917.68 3645.72 4.00 -84.95 4059.43 Togepi LI T2
183.77 4207.91 -1946.86 3643.74 4.00 -11.17 4075.63
183.77 4202.60 -2211.25 3626.30 0.00 0.00 4222.85
184.11 4202.20 -2247.53 3623.80 3.00 161.97 4242.97 Togepi LI T3
184.11 4201.20 -2755.28 3587.31 0.00 0.00 4523.31 Togepi LI T4
CASING DETAILS
No. TVD
MD
Size
Name
All TVD depths are
ssTVD plus 66.2'for RKBE.
#
,#
... ,
~
.~
"''''
..~
~~
~~. )/.,
#~~
-"
~~
:s
a::
0
0
::!.
;s
0.-
Ö
.~ 4000-
>
ë
E-<
4201.22 10450.80 4 1/2"
4.500
~
Total Depth: 10450.81' MD. 4201.2' TVD
End Dir : 9941.75' MD, 4202.2' TVD
Start Dir 3/1 00' : 9905.38' MD, 4202.6'TVD
End Dir : 9640.36' MD. 4207.91' TVD
Start Dir4/100' : 9581.32' MD, 4208.17'TVD
Start Dir 4/1 00' : 8300.33' MD, 4208.88'TVD
:':nd,Dir, : 8?04-76' MD~ 4206.2; TVDg"
. ¡. . . ~
4400
1/2"
2400
3600
2800
COMPANY DETAILS
HI' Amoco
Calculation Method: Minimmn Curvature
Enur System: ISCWSA
Scan Method: Trav Cylinder North
Enm Surface: El1iptjcal + Casing
Wamin~ MethtXl: Rules Based
:s
~
0
Ë
+'
::E'
1::
~
::E'
=:
0
</J
1400-
-1400
REFERENCE INFORMATION
SURVEY PROGRAM
Plan: MPS-03Ll wpOl (Plan MPS-03/1'lan MPS.03Ll)
Tool
MWD+IFR+MS
Depth Fm Depth To SurveylPlan
6778.00 10450.81 Planned: MPS-03LI wpOl VI
Reviewed:
Date:
Co-ordinate (NÆ) Reference: Well Centre: Plan MpS-03, True North
Vertical (1VD) Reference: Plan MpS-03 66.20 66.20
Section (VS) Reference: User Defmed (89928N,3643.15E)
Measured Depth Reference: Plan Ml'S-03 66.20 66.20
Calculation Method: Minimum CurvatlU'e
SIJrt Dir 12/100' : 6778' MD, 4208.53'TVD
T.. :--...-.
Ehd Dir : 7006.35' MD, 4245.09' TVD
~.l
!
I
,
I
¡
i
I
I
..r -
I
I
I
Dale: 7/9/2002
Created fiy: Ken Allen
Checked:
Date:
Name +NI-S +FJ-W Northing Ea...ting Latitude LoogiluOO Slot
Plan MPS-03 61.83 -296.68 6000037.19 566047.81 70024'37.937N 149°2T43.867W N/A
TARGET DETAILS
Name TVD +N/-S +E/-W Northing Easting Shape
Togepi 1.1 T4 420120 -2755.28 3587.31 5997314.00 569659,00 Point
T ogepi 1.1 T3 4202.20 -2247.53 3623.80 5997822.(10 569691.00 Point
T ogepi 1.1 Tl 4206.20 -815.42 3745.48 5999255.00 569800,00 Point
Togepi LIPoly 4206.20 815.27 3578.88 c.oO(l884.0(l 569619,00 Polygon
T ogepi 1.1 T2 4208.20 -1917.68 3645.72 5998152.0(1 569710,00 Poinl
MPS-03 Faultl 4266.20 -2055.89 3327.46 5998011.00 569393.00 Polygon
MPS-03 Fault2 4266.20 -196.39 3525.93 5999872.(1(1 569575,00 Polygon
SECTION DETAILS
See MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target
1 6778.00 70.00 160.00 4208.53 899.28 3643.15 0.00 0.00 0.00
2 7006.35 91.60 177.19 4245.09 680.28 3686.26 12.00 39.93 218.32
3 8300.33 91.60 177.19 4208.88 -611.64 3749.68 0.00 0.00 1509.11
4 8504.34 89.90 185.17 4206.20 -815.42 3745.48 4.00 10 I. 98 1712.93 Togepi Ll TI .--.~
5 8504.76 89.90 185.19 4206.20 -815.83 3745.44 4.00 107.20 1713.35
6 9581.32 89.90 185.19 4208.17 -1887.98 3648.11 0.00 0.00 2786.86
7 9611.12 90.00 184.00 4208.20 -1917.68 3645.72 4.00 -84.95 2816.60 Togepi Ll T2
8 9640.36 91.15 183.77 4207.91 -1946.86 3643.74 4.00 -11.17 2845.80
9 9905.38 91.15 183.77 4202.60 -2211.25 3626.30 0.00 0.00 3110.42
10 9941.75 90.1 I 184.11 4202.20 -2247.53 3623.80 3.00 161. 97 3146.74 Togepi L 1 T3
11 10450.8 I 90.11 184.11 4201.20 -2755.28 3587.31 0.00 0.00 3654.99 Togepi L 1 T4
All TVD depths are
ssTVD plus 66.2'for RKBE.
I
¡
i ¡
I T"L~I Drpth: 10450.81' MD, 4201.2'TVD
-2800- -......,....
I
2800
¡
i
I
3500
I
4200
West(-)/East(+) [700ft/in]
I
4900
WELL DETAILS
CASING DETAILS
FORMATION TOP DETAILS
No. TVD
Name
Size
No. TVDPath MDPath Formation
MD
4201.22 10450.80 4 1/2"
4222.20 6822.36 TSBD-OA
4.500
.....,
AÞ / >'», "yÇX..Y;..~......'..' '..../...;{:. '>./.. ' y~
-V",. ,~{f/;;;2':.<,,">' '..~
,~ /"'" ,
., ,>", ,
"
~
(
BP
My Planning Report MAP
Company:
Field:
Site:
Well:
Wellpath:
Field:
BPAmOco
Milne Point
M Pt S Pad
Plan MPS-03
Plan MPS-03L 1
Date: 7/8/2002 Time:... <14:29:31 Page:
Co-ordinate(NE) Reference: Well: Plan MPS-03, True North
Vertical (TVD) Reference: Plan MPS-03 66.20 66.2
Section (VS) Reference: Well (O.00N,0.00E.127.53Azi)
Survey Calculation Method: Minimum Curvature Db:
1
Oracle
Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska. Zone 4
Well Centre
BGGM2002
Site:
M pt S Pad
Site Position:
From: Map
Position Uncertainty:
Ground Level:
Northing: 5999978.00 ft
Easting: 566345.00 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 24 37.329 N
149 27 35.171 W
True
0.51 deg
0.00 ft
0.00 ft
Well:
Plan MPS-03
Slot Name:
+N/-S 61.83 ft Northing: 6000037.19 ft
+E/-W -296.68 ft Easting: 566047.81 ft
Position Uncertainty: 0.00 ft
Latitude:
Longitude:
70 24 37.937 N
149 27 43.867 W
Well Position:
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
Plan MPS-03 66.20
7/1/2002
57498 nT
Depth From (TVD)
ft
0.00
Height
66.20 ft
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Plan MPS-03
6788.00 ft
Mean Sea Level
25.83 deg
80.80 deg
Direction
deg
127.53
Wellpath: Plan MPS-03L 1
+N/-S
ft
0.00
Plan:
MPS-03L 1 wp01
Date Composed:
Version:
Tied-to:
7/1/2002
1
From: Definitive Path
Principal: Yes
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
10450.80 4201.22 4.500 6.125 41/2"
Formations
MD TVD Formations Lithology Dip Angle Dip Direction
ft ft deg deg
0.00 BPRF 0.00 0.00
0.00 TUgnu 0.00 0.00
0.00 SBF2-NA 0.00 0.00
0.00 SBF1-NB 0.00 0.00
0.00 SBE4-NC 0.00 0.00
0.00 SBE2-NE 0.00 0.00
0.00 SBE1-NF 0.00 0.00
6822.36 4222.20 TSBD-OA 0.00 0.00
0.00 TSBC 0.00 0.00
0.00 TSBB-OB 0.00 0.00
Targets
Map Map <--- Latitude ---> <-- Longitude -->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min See Deg Min See
Dip. Dir. ft ft ft ft ft
Togepi L 1 T4 4201.20 -2755.28 3587.31 5997314.00 569659.00 70 24 10.831 N 149 25 58.758 W
Togepi L 1 T3 4202.20 -2247.53 3623.80 5997822.00 569691.00 70 24 15.824 N 149 25 57.682 W
Togepi L 1 T1 4206.20 -815.42 3745.48 5999255.00 569800.00 70 24 29.908 N 149 25 54.096 W
Togepi L 1 T2 4208.20 -1917.68 3645.72 5998152.00 569710.00 70 24 19.068 N 149 25 57.035 W
BP
My Planning Report MAP
(
Company: BP Amoco
Field: Milne Point
Site: M Pt SHad
Well: Plan MPS-03
Wellpath: PlanMPS-03L1
Date:7!8/2002 Time: 14:29:31 Page:
Co-ordinate(NE)Reference: Well: Plan MPS-03, True North
Vertical (TVD) Reference: Plan MPS-03 66.20 66.2
Section (VS) Reference: Well (O.00N,0.00E,127.53Azi)
Survey Calculatioll Method: Minimum Curvature Db: Oracle
2
Targets
Name
Description
Dip. Dir.
TVD
ft
+N/-S
ft
+E/-W
ft
Map
Northing
ft
Map
Easting
ft
<==Latitude~ <---LolÏgi~de-->
Deg Min Sec Deg Min See
MPS-03 Fault1 4266.20 -2055.89 3327.46 5998011.00 569393.00 70 24 17.710 N 149 26 6.363 W
-Polygon 1 4266.20 -2055.89 3327.46 5998011.00 569393.00 70 24 17.710 N 149 26 6.363 W
-Polygon 2 4266.20 -2171.72 4211.55 5997903.00 570278.00 70 24 16.567 N 149 25 40.459 W
MPS-03 Fault2 4266.20 -196.39 3525.93 5999872.00 569575.00 70 24 35.997 N 149 26 0.522 W
-Polygon 1 4266.20 -196.39 3525.93 5999872.00 569575.00 70 24 35.997 N 149 26 0.522 W
-Polygon 2 4266.20 1591.37 3466.73 6001659.00 569500.00 70 24 53.580 N 149 26 2.232 W
Plan Section Information
MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/100ft deg/100ft deg/10OO deg
6778.00 70.00 160.00 4208.53 899.28 3643.15 0.00 0.00 0.00 0.00
7006.35 91.60 177.19 4245.09 680.28 3686.26 12.00 9.46 7.53 39.93
8300.33 91.60 177.19 4208.88 -611.64 3749.68 0.00 0.00 0.00 0.00
8504.34 89.90 185.17 4206.20 -815.42 3745.48 4.00 -0.83 3.91 101.98 Togepi L1 T1
8504.76 89.90 185.19 4206.20 -815.83 3745.44 4.00 -1.18 3.82 107.20
9581.32 89.90 185.19 4208.17 -1887.98 3648.11 0.00 0.00 0.00 0.00
9611.12 90.00 184.00 4208.20 -1917.68 3645.72 4.00 0.35 -3.98 -84.95 Togepi L 1 T2
9640.36 91.15 183.77 4207.91 -1946.86 3643.74 4.00 3.92 -0.78 -11.17
9905.38 91.15 183.77 4202.60 -2211.25 3626.30 0.00 0.00 0.00 0.00
9941.75 90.11 184.11 4202.20 -2247.53 3623.80 3.00 -2.85 0.93 161.97 Togepi L 1 T3
10450.81 90.11 184.11 4201.20 -2755.28 3587.31 0.00 0.00 0.00 0.00 Togepi L 1 T4
Survey
MD Incl Azim TVD Sys TVD l\'lapN MapE VS DLS T oollCom ment
ft deg deg ft ft ft ft ft deg/1 000
6778.00 70.00 160.00 4208.53 4142.33 6000968.56 569682.52 2341.50 0.00 Start Dir 12/100' : 6778' MD,
6800.00 72.03 161.78 4215.69 4149.49 6000948.97 569689.50 2358.87 12.00 MWD+IFR+MS
6822.36 74.12 163.55 4222.20 4156.00 6000928.61 569696.05 2376.36 12.00 TSBD-OA
6825.00 74.36 163.76 4222.92 4156.72 6000926.18 569696.79 2378.41 12.00 MWD+IFR+MS
6850.00 76.71 165.69 4229.16 4162.96 6000902.89 569703.37 2397.69 12.00 MWD+IFR+MS
6875.00 79.07 167.58 4234.41 4168.21 6000879.17 569709.23 2416.66 12.00 MWD+IFR+MS
6900.00 81.44 169.44 4238.64 4172.44 6000855.07 569714.34 2435.25 12.00 MWD+IFR+MS
6925.00 83.82 171.28 4241.84 4175.64 6000830.67 569718.71 2453.43 12.00 MWD+IFR+MS
6950.00 86.21 173.11 4244.01 4177.81 6000806.03 569722.31 2471.14 12.00 MWD+IFR+MS
6975.00 88.60 174.92 4245.14 4178.94 6000781.22 569725.13 2488.34 12.00 MWD+IFR+MS
7000.00 91.00 176.73 4245.23 4179.03 6000756.31 569727.17 2504.96 12.00 MWD+IFR+MS
7006.35 91.60 177.19 4245.09 4178.89 6000749.97 569727.56 2509.09 12.00 End Dir : 7006.35' MD, 4245.0
7100.00 91.60 177.19 4242.47 4176.27 6000656.53 569732.98 2569.69 0.00 MWD+IFR+MS
7200.00 91.60 177.19 4239.67 4173.47 6000556.74 569738.76 2634.39 0.00 MWD+IFR+MS
7300.00 91.60 177.19 4236.87 4170.67 6000456.96 569744.55 2699.09 0.00 MWD+IFR+MS
7400.00 91.60 177.19 4234.07 4167.87 6000357.17 569750.33 2763.80 0.00 MWD+IFR+MS
7500.00 91.60 177.19 4231.28 4165.08 6000257.39 569756.11 2828.50 0.00 MWD+IFR+MS
7600.00 91.60 177.19 4228.48 4162.28 6000157.61 569761.90 2893.20 0.00 MWD+IFR+MS
7700.00 91.60 177.19 4225.68 4159.48 6000057.82 569767.68 2957.90 0.00 MWD+IFR+MS
7800.00 91.60 177.19 4222.88 4156.68 5999958.04 569773.46 3022.61 0.00 MWD+IFR+MS
7900.00 91.60 177.19 4220.08 4153.88 5999858.25 569779.25 3087.31 0.00 MWD+IFR+MS
8000.00 91.60 177.19 4217.28 4151.08 5999758.47 569785.03 3152.01 0.00 MWD+IFR+MS
8100.00 91.60 177.19 4214.49 4148.29 5999658.69 569790.81 3216.71 0.00 MWD+IFR+MS
8200.00 91.60 177.19 4211.69 4145.49 5999558.90 569796.60 3281.42 0.00 MWD+IFR+MS
8300.33 91.60 177.19 4208.88 4142.68 5999458.79 569802.40 3346.33 0.00 Start Dir 4/100' : 8300.33' MD
8400.00 90.77 181.09 4206.81 4140.61 5999359.20 569804.78 3408.20 4.00 MWD+IFR+MS
8504.34 89.90 185.17 4206.20 4140.00 5999255.00 569800.00 3467.13 4.00 Togepi L 1 T1
8504.76 89.90 185.19 4206.20 4140.00 5999254.58 569799.97 3467.35 4.00 End Dir : 8504.76' MD, 4206.2
Company: BP Amoco
Field: Milne Point
Site: M Pt S Pad
Well: Plan MPS-03
Wellpath: Plan MPS-03L 1
Survey
MD InclAzim
ft deg deg
8600.00 89.90 185.19
8700.00 89.90 185.19
8800.00 89.90 185.19
8900.00 89.90 185.19
9000.00 89.90 185.19
9100.00 89.90 185.19
9200.00 89.90 185.19
9300.00 89.90 185.19
9400.00 89.90 185.19
9500.00 89.90 185.19
9581.32 89.90 185.19
9600.00 89.96 184.44
9611.12 90.00 184.00
9640.36 91.15 183.77
9700.00 91.15 183.77
9800.00 91.15 183.77
9905.38 91.15 183.77
9941.75 90.11 184.11
10000.00 90.11 184.11
10100.00 90.11 184.11
10200.00 90.11 184.11
10300.00 90.11 184.11
10400.00 90.11 184.11
10450.81 90.11 184.11
BP
My Planning Report MAP
(
Date: .7/8/2002 Time: 14:29:31 Page:
Co-ordinate(NE1R~ference: Well:Plan MPS-03, True North
VerticarcrYD) Reference; Plan MPS:.o3662066.2
Sedion (VS) Refertmce: Well (0.00N,O.00E,127.53Azi)
SurveyCalctdationMethod: Minimum Curvature Db: Oracle
3
TVD Sys TVD MapN MapE Tool/Comment
ft ft ft ft ft deg/10Oft
4206.38 4140.18 5999159.67 569792.19 3518.30 0.00 MWD+IFR+MS
4206.56 4140.36 5999060.01 569784.04 3571.79 0.00 MWD+IFR+MS
4206.74 4140.54 5998960.36 569775.88 3625.28 0.00 MWD+IFR+MS
4206.92 4140.72 5998860.70 569767.72 3678.78 0.00 MWD+IFR+MS
4207.11 4140.91 5998761.04 569759.56 3732.27 0.00 MWD+IFR+MS
4207.29 4141.09 5998661.39 569751.40 3785.76 0.00 MWD+IFR+MS
4207.47 4141.27 5998561.73 569743.24 3839.26 0.00 MWD+IFR+MS
4207.66 4141.46 5998462.07 569735.08 3892.75 0.00 MWD+IFR+MS
4207.84 4141.64 5998362.42 569726.92 3946.24 0.00 MWD+IFR+MS
4208.02 4141.82 5998262.76 569718.76 3999.73 0.00 MWD+IFR+MS
4208.17 4141.97 5998181.72 569712.12 4043.23 0.00 Start Dir 4/100' : 9581.32' MD
4208.20 4142.00 5998163.09 569710.72 4053.33 4.00 MWD+IFR+MS
4208.20 4142.00 5998152.00 569710.00 4059.43 4.00 Togepi L 1 T2
4207.91 4141.71 5998122.81 569708.28 4075.63 4.00 End Dir : 9640.36' MD, 4207.9
4206.71 4140.51 5998063.29 569704.88 4108.76 0.00 MWD+IFR+MS
4204.71 4138.51 5997963.48 569699.18 4164.31 0.00 MWD+IFR+MS
4202.60 4136.40 5997858.30 569693.18 4222.85 0.00 Start Dir 3/100' : 9905.38' MD
4202.20 4136.00 5997822.00 569691.00 4242.97 3.00 Togepi L 1 T3
4202.09 4135.89 5997763.87 569687.34 4275.05 0.00 MWD+IFR+MS
4201.90 4135.70 5997664.08 569681.05 4330.12 0.00 MWD+IFR+MS
4201.70 4135.50 5997564.29 569674.77 4385.19 0.00 MWD+IFR+MS
4201.51 4135.31 5997464.50 569668.48 4440.26 0.00 MWD+IFR+MS
4201.32 4135.12 5997364.70 569662.19 4495.33 0.00 MWD+IFR+MS
4201.20 4135.00 5997314.00 569659.00 4523.31 0.00 Togepi L 1 T4
TREE: Cameron 4-1/16" 5M PHüPü~I::.LJ c.;üMPLl::.llüN
WELLHEAD: FMC Gen 6 11",5M 1\1'".... ~s-n3 0- 1\11 D.'........."...' ~ _03 IL,"~
Tubing Head: 11" x 4-1/2", ., ~~ --,: ~
FMC Tubing Hanger íXXXp
~~
20" 92 Ibltt, H-40 Welded ... / E III ~ 42" Hole
Insulated /... 4-1/2" X 1" Gas Lift Mandrel @ 2,000' MD , 2000' TVD,
Diesel Freeze protect to ...... ..... RP shear valve open position
750' MD
KB. ELEV =67.5'
Cellar Box ELEV = 39.3'
1121
Jet Pump Installed in
Sliding Sleeve Post rig!
4-11211,12.6 Ib/ft, L-80, IBT-M
Coupling 00: 5.211
Orift/IO: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7,500, 80%=6,000 psi
9.2 KCI with corrosion
inhibitor as packer fluid
~
'" .
BIW 1- Wire
Phoenix Pressure Gauge (3.850" 10, W/BIW 1- wire down
to lower sensor)
Halliburtion Dura Sleeve XD WIX Nipple (3.813" 10)
Phoenix Pressure Gauge (2.840" 10)
~
7-5/8" x 4-1/2" S-3 Packer
I Set @ 6,678' MD, 4208' TVD I
7-5/811 29.7#, L-80, BTC-M
Casing Drift: 6.75
Casing 10: 6.875
Coupling 00: 8.5"
Burst: 6,890 psi
Collapse: 4,790 psi
~
3-1/2" HES 'XN' nipple 2.750" 10 No Go W/RHC ball & rod
Wireline Entry Guide
Window in 7" casing @ 6,7781 MD
Well Inclination @ Window = 70 Degrees
\~
Multi-Lateral Junction 6,7781
6-1/8" OA Lateral TO 10,450'
6-1/8" OB Lateral TO 10,463'
......
---. -
- -
- -
--
OA Horizontal 6-1/8" hole
r-- -- - -
- -
- -
--
4-1/2" Slotted Liner W/Hookwall hanger
7" Casing Shoe @ 7,016' MD
Well Inclination @ Shoe = 76 Degrees
~ ~
~..<:::, .~~ 9-7/S"Hole
"
\ ~ - -------
, '-- OB Horizontal 6-1/8" hole
---------
PBTD
TD
4-1/2" Slotted Liner & Hanger
DATE
27 Jun 02
REV. BY
SKC
COMMENTS
Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion
Milne Point Unit
WF : MPS-03
API NO:
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
x
DEVELOPMENT
REDRILL
EXPLORATION
INJECTION WELL
INJECTION WELL
REDRILL
Rev: 6/18/02
C\jody\templates
( (
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSNUTTAL LETTER
WELL NAMElll'ú
#fi( ~O,3 ¿ /
CHECK WHAT APPLIES
ADD-ONS (OPTIONS) "CLUE"
MUL TI LATERAL The permit is fOJ a new wellbore segment of existing well
,¡J1,11'4 )l'?J'b' -~ Permit N1J:>~/YXAPI No. .10 "'ð.G, ~ - 2Jlð$
(If API number last two (2) Production should continue to be reported as a function of
digits are between 60-69) the original API number stated above.
x
PILOT HOLE (PH)
In accordance with 20 AAC 25.005(t), all records, data and
logs acquired for the pilot hole must be .clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
ANNULAR DISPOSAL Please note that an disposal of fluids generated. . .
INTO ANNULUS OF
ANOTHER WELL ON
SAME PAD
L-)
SPACING EXCEPTION
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Companv Name) will assume the liability of any protest to
the spacing exception that may occur.
DRY DITCH SAMPLE
All dry ditch sample sets submitted to the Commission must
be in no greater than 30' sample intervals from below the
permafrost or from where samples are first caught and 10'
sample intervals through target zones.
/4/¿'¡
WELL PERMIT CHECKLIST COMPANY ß/À' WELL NAME ;o//S - ð )LJ PROGRAM: Exp- Dev ~ Redrll- Se~ - Wellbore segX Ann. disposal para req-
FIELD & POOL ,52...oS / tf 6 INIT CLASS f)",-(.,/ /.- ~ ,1 GEOL AREA ?"7Ö UNIT# 113 ¿ c¡ ON/OFF SHORE C>A)
.ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . P N~
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. .. . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party... . . . . .. . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
:AW! ~~T~ '" 12. Permit ca. ~ be issued without adminis. trativ~ approval.. . . . . ~N
I)' r - ~ / / Ó..L- 13. Can permit be approved before 15-day walt.. . . . . . . . . . Y N
ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . 'N
15. Surface casing protects aU known USOWs. . . . . . . . . . . Y N
16. CMT vol adequate to circulate on conductor & surf csg. . . . . -¥--N-
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y N ~ / J A - ('-- /'1-1
18. CMT will cover all known productive horizons. . . . . . . . . . ~ ß.I f 'i ) t"V If<.
19. Casing designs adequate for C, T,. B & permafrost. . . . . . . œ:. N
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . i2 N
21. If a re-drill, has a 10-403 for abandonment been approved. . . .~ A.t IA-
22. Adequate well bore separation proposed.. . . . . . . . . .-. . CIl N
23. If diverter required, does it meet regulations. . . . . . . . . . --¥-tt"" AI lit-
24. Drilling fluid program schematic & equip list adequate. . . . . 4? N
25. BOPEs, do they meet regulation. . . . '.' . . . . . . . . . . Œ-. N . r ð j rJ/:' / - Jl'Jr /' .,
26. BOPE press rating appropriate; test to C/O 00 psig. ~ N ;1t ':> r (, ..., '7 W r;)' t-
27. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . . N
28. Work will occur without operation shutdown. . . . . . . . . . . . ;' ~.
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y ~
30. Permit can be issued wlo hydrogen sulfide measures. .. . . N1J
31. Data presented on potential overpressure zones. . . . . . . ~N -- ¡/ ) .LJ
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y /l./ ' I 7.
AP-PR - o/'T.9' 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . N .
~ ?~ ðZ, 34. Contact namelphone for weekly progress reports [exploratory 0 . Y N
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface;
(C) will not impair mechanical integrity of the well used for disposal;
(D) will not damage producing formation or impair recovery from a
poo.; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular: C MMISSION:
RP# JDH-~ #C1 COT.
WGA'\.¡.fAk DTS (1) j (, J ö
1\P.~'l- Dj\ JE
iJ.iUlT T{ "t 0 L.
GEOLOGY
APPR DATE
~ ~~2-
~ ¡;'/M,j ';:.,
r,"c".'rJ ($"A" /'7 f') -,1ft
;...bf
G:\geology\permits\checklist. doc
Commentsllnstructions:
Well History File
APPENDIX
Infonnation of detailed nature that is not
particularly germane to the Well Permitting Process'
but is part of the history file.
To improve the readability of the Well History file and to
simplrty finding information, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
(
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Nov 27 10:00:13 2002
Reel Header
Service name............ .LISTPE
Da te. . . . . . . . . . . . . . . . . . . . . 02/11/27
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name... ........ .... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments. ...... ..... .... .STS LIS
d Dd-I'-I7
//33;
Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 02/11/27
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name.... ...UNKNOWN
Comments. . . . . . . . . . . . . . . . .STS LIS
Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 1
AK-MW-22127
B. HENNINGSE
E. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 6
AK-MW-22127
B. HENNINGSE
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MPS-03 L1
500292310560
BP Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
27-NOV-02
MWDRUN 2
AK-MW-22127
B. HENNINGSE
E. VAUGHN
MWDRUN 7
AK-MW-22127
B. HENNINGSE
C. DIXON
7
12N
11E
3368
4744
.00
66.20
38.70
MWDRUN 5
AK-MW-22127
B. HENNINGSE
C. DIXON
#
WELL CASING RECORD
1ST STRING
2ND STRING
3 RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.875 20.000 110.0
6.125 7.625 6943.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1, 2, 6, AND 7 COMPRISED DIRECTIONAL WITH
DUAL GAMMA RAY
(DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND
ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 6 AMD 7
ALSO INCLUDED
AT-BIT INCLINATION (ABI). MWD RUN 5 WAS DIRECTIONAL
ONLY TO POSITION
A WHIPSTOCK AT 6943'MD/4170'TVD - ONLY ROP DATA ARE
PRESENTED.
4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 8/29/02. MWD DATA
ARE CONSIDERED
PDC.
5. MWD RUNS 1, 2, 5, 6, AND 7 REPRESENT WELL MPS-03 Ll
WITH API#:
50-029-23105-60. THIS WELL REACHED A TOTAL DEPTH
(TD) OF 10260'MD/
4193'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name...... ..... ..STSLIB.OOl
Service Sub Level Name...
Version Number.... ...... .1.0.0
Date of Generation...... .02/11/27
Maximum Physical Record. .65535
File Type.. ....... ...... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
1
(
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
clipped curves; all bit runs merged.
.5000
START DEPTH
73.5
90.5
90.5
90.5
90.5
90.5
110.5
STOP DEPTH
10207.0
10214.0
10214.0
10214.0
10214.0
10214.0
10261.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 73.5 3527.0
MWD 2 3527.0 6943.0
MWD 5 6943.5 6966.5
MWD 6 6966.5 7507.0
MWD 7 7507.0 10261.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type........ ....... ...0
Data Specification Block Type.....O
Logging Direction..... ........... . Down
Optical log depth units. ........ ..Feet
Data Reference Point............. . Undefined
Frame Spacing.... ..... ........... .60 .1IN
Max frames per record.. ........ ...Undefined
Absent value............... ...... .-999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 73.5 10261 5167.25 20376 73.5 10261
ROP MWD FT/H 0.23 3867.61 331.027 20302 110.5 10261
GR MWD API 8.22 131.2 70.2501 20268 73.5 10207
RPX MWD OHMM 0.14 2000 30.8034 20248 90.5 10214
RPS MWD OHMM 0.08 2000 41.3768 20248 90.5 10214
RPM MWD OHMM 0.06 2000 51.3643 20248 90.5 10214
RPD MWD OHMM 0.05 2000 91.8049 20248 90.5 10214
FET MWD
HOUR
0.0467
169.21
0.486095 20248
First Reading For Entire File..... .... .73.5
Last Reading For Entire File.... ...... .10261
File Trailer
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number..... .... ..1.0.0
Date of Generation.. .... .02/11/27
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name..... ..... .STSLIB.002
Physical EOF
File Header
Service name.. ..... .... ..STSLIB.002
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation... ... .02/11/27
Maximum Physical Record..65535
File Type............... .LO
Previous File Name... ....STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPS
RPX
RPM
RPD
FET
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
73.5
90.5
90.5
90.5
90.5
90.5
110.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
STOP DEPTH
3490.0
3482.0
3482.0
3482.0
3482.0
3482.0
3527.0
29-JUL-02
Insite
66.37
Memory
3527.0
110.0
3527.0
.4
71.6
TOOL NUMBER
164580
90.5
10214
EWR4
$
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.. .............. ..0
Data Specification Block Type.....O
Logging Direction...... .......... . Down
Optical log depth units.... ...... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record.. .... ... ... . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . - 9 9 9
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
121079
9.875
110.0
Spud Mud
9.00
165.0
7.0
400
10.0
5.800
5.080
4.500
3.500
65.0
75.2
64.0
65.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
RPX MWD010 OHMM 4 1 68 12 4
RPS MWD010 OHMM 4 1 68 16 5
RPM MWD010 OHMM 4 1 68 20 6
RPD MWD010 OHMM 4 1 68 24 7
FET MWD010 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 73.5 3527 1800.25 6908 73.5 3527
ROP MWD010 FT/H 17.09 3867.61 394.976 6834 110.5 3527
GR MWD010 API 14.33 125.1 65.0851 6834 73.5 3490
RPX MWD010 OHMM 0.14 1667.6 44.0179 6784 90.5 3482
RPS MWD010 OHMM 0.08 2000 65.019 6784 90.5 3482
RPM MWD010 OHMM 0.06 2000 91.4987 6784 90.5 3482
RPD MWD010 OHMM 0.05 2000 203.697 6784 90.5 3482
FET MWD010 HOUR 0.0467 1.5087 0.272658 6784 90.5 3482
(
First Reading For Entire File...... ... .73.5
Last Reading For Entire File......... ..3527
File Trailer
Service name... ..... .... .STSLIB.002
Service Sub Level Name...
Version Number.... .... ...1.0.0
Date of Generation..... ..02/11/27
Maximum Physical Record..65535
File Type. . . . . . . . . . . . . . . .LO
Next File Name......... ..STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation..... ..02/11/27
Maximum Physical Record..65535
File Type. . . . . . . . . . . . . . . .LO
Previous File Name... ... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
FET
RPD
RPM
RPS
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
3482.5
3482.5
3482.5
3482.5
3482.5
3490.5
3527.5
STOP DEPTH
6943.0
6943.0
6943.0
6943.0
6943.0
6943.0
6943.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
31-JUL-02
Insite
66.37
Memory
6943.0
3527.0
6943.0
53.8
84.8
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
TOOL NUMBER
164580
121079
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.......... .... ....0
Data Specification Block Type.. ...0
Logging Direction... ..... ... ..... . Down
Optical log depth units... ....... .Feet
Data Reference Point........ .... ..Undefined
Frame Spacing...... .... ...... ... ..60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
9.875
110.0
Spud Mud
9.20
124.0
7.0
400
8.4
8.200
5.190
6.000
4.600
65.0
106.7
65.0
65.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3482.5 6943 5212.75 6922 3482.5 6943
ROP MWD020 FT/H 2.91 1497.42 377.771 6832 3527.5 6943
GR MWD020 API 8.22 129.18 67.1063 6906 3490.5 6943
RPX MWD020 OHMM 3.4 215.57 16.8208 6922 3482.5 6943
RPS MWD020 OHMM 2.97 467.87 18.6297 6922 3482.5 6943
RPM MWD020 OHMM 2.1 584.16 19.5151 6922 3482.5 6943
RPD MWD020 OHMM 2.28 1901.8 26.9157 6922 3482.5 6943
FET MWD020 HOUR 0.0489 8.1506 0.526642 6922 3482.5 6943
First Reading For Entire File...... ... .3482.5
Last Reading For Entire File.......... .6943
File Trailer
Service name.... ..... ....STSLIB.003
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation..... ..02/11/27
Maximum Physical Record..65535
File Type............ ....LO
Next File Name.... ...... .STSLIB.004
Physical EOF
File Header
Service name...... ...... .STSLIB.004
Service Sub Level Name...
Version Number.. ... ..... .1.0.0
Date of Generation.. .... .02/11/27
Maximum Physical Record. .65535
File Type........... .....LO
Previous File Name... ... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
ROP 6943.5
$
4
header data for each bit run in separate files.
5
.5000
STOP DEPTH
6966.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
07-AUG-02
Insite
66.37
Memory
6967.0
6943.0
6967.0
.0
.0
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
TOOL NUMBER
151107
156401
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
6.750
6943.0
#
BOREHOLE CONDITIONS
(
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ...... ........0
Data Specification Block Type.....O
Logging Direction... ........ .... ..Down
Optical log depth units......... ..Feet
Data Reference Point. ............ . Undefined
Frame Spacing..... ............... .60 .1IN
Max frames per record..... ........Undefined
Absent value........ ...... ....... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Flo-pro
9.10
60.0
8.5
30000
5.0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
Name Service Unit
DEPT FT
ROP MWD050 FT/H
Min
6943.5
0.23
Max
6966.5
26.4
First Reading For Entire File......... .6943.5
Last Reading For Entire File.......... .6966.5
File Trailer
Service name........ .... .STSLIB.004
Service Sub Level Name...
Version Number..... ......1.0.0
Date of Generation. .... ..02/11/27
Maximum Physical Record..65535
File Type........... .... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Mean Nsam
6955 47
12.2838 47
.0
.0
.0
.0
First
Reading
6943.5
6943.5
Last
Reading
6966.5
6966.5
Service name...... .... ...STSLIB.005
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation...... .02/11/27
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.004
Conunent Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
GR
RPX
RPS
RPD
RPM
ROP
$
5
header data for each bit run in separate files.
6
.5000
START DEPTH
6943.5
6943.5
6943.5
6943.5
6943.5
6943.5
6967.0
STOP DEPTH
7461.0
7453.5
7461.0
7461.0
7461.0
7461.0
7507.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
07-AUG-02
Insite
66.37
Memory
7507.0
6967.0
7507.0
73.9
92.7
TOOL NUMBER
151107
156401
6.125
6943.0
Flo-pro
9.00
65.0
9.5
27000
5.2
.140
.130
.170
.160
70.0
76.6
70.0
70.0
(
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type... ..0
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point. ..... ..... ...Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value................ ..... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 6943.5 7507 7225.25 1128 6943.5 7507
ROP MWD060 FT/H 2.78 639.07 248.209 1081 6967 7507
GR MWD060 API 46.32 108.07 78.3553 1021 6943.5 7453.5
RPX MWD060 OHMM 0.23 1886.77 37.1401 1036 6943.5 7461
RPS MWD060 OHMM 0.33 1886.37 45.4417 1036 6943.5 7461
RPM MWD060 OHMM 0.3 2000 60.9261 1036 6943.5 7461
RPD MWD060 OHMM 8.76 2000 57.4935 1036 6943.5 7461
FET MWD060 HOUR 0.1047 169.21 1.26645 1036 6943.5 7461
First Reading For Entire File......... .6943.5
Last Reading For Entire File... ....... .7507
File Trailer
Service name........... ..STSLIB.005
Service Sub Level Name...
Version Number.... ...... .1.0.0
Date of Generation...... .02/11/27
Maximum Physical Record..65535
File Type.. ...... ... .... .LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name..... ....... .STSLIB.006
Service Sub Level Name...
Version Number.... ...... .1.0.0
Date of Generation. .... ..02/11/27
Maximum Physical Record..65535
File Type.... .......... ..LO
Previous File Name. .... ..STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
6
header data for each bit run in separate files.
7
.5000
START DEPTH
7454.0
7461.5
7461.5
7461.5
7461.5
7461.5
7507.5
STOP DEPTH
10207.0
10214.0
10214.0
10214.0
10214.0
10214.0
10261.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
08-AUG-02
Insite
66.37
Memory
10260.0
7507.0
10260.0
81.4
94.5
TOOL NUMBER
151107
156401
6.125
6943.0
Flo-pro
9.20
54.0
9.5
33000
5.0
.160
.130
.120
.160
65.0
81.2
65.0
65.0
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.......... ...... ..0
Data Specification Block Type.....O
Logging Direction........ ........ . Down
Optical log depth units...... .." .Feet
Data Reference Point.... ......... . Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . - 999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7454 10261 8857.5 5615 7454 10261
ROP MWD070 FT/H 2.45 863.84 212.677 5508 7507.5 10261
GR MWD070 API 49.59 131.2 79.0995 5507 7454 10207
RPX MWD070 OHMM 7 2000 30.908 5506 7461.5 10214
RPS MWD070 OHMM 8.06 2000 40.079 5506 7461.5 10214
RPM MWD070 OHMM 8.79 2000 40.1551 5506 7461.5 10214
RPD MWD070 OHMM 10.2 1664.59 41.9743 5506 7461.5 10214
FET MWD070 HOUR 0.1275 8.8923 0.551269 5506 7461.5 10214
First Reading For Entire File......... .7454
Last Reading For Entire File.......... .10261
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/27
Maximum Physical Record..65535
File Type.... ........... .LO
Next File Name.... ...... .STSLIB.007
Physical EOF
Tape Trailer
Service name. ..... .... ...LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 111/27
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name. .............. .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... .UNKNOWN
Comments.... .... ........ .STS LIS Writing
Reel Trailer
Service name....... '.'" .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 02/11/27
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name...... ...... ... .UNKNOWN
Continuation Number..... .01
Next Reel Name. ......... .UNKNOWN
Comments.... ... ......... .STS LIS
Library. Scientific Technical Services
Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File