Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-147 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. dO:J. - L Lt 7 Well History File Identifier Organizing (done) 0 Two-sided 1111111111111111111 0 Rescan Needed 1111111111111111111 RESCAN DIGITAL DATA ~kettes, No. 9- 0 Other, NolType: OVERSIZED (Scannable) 0 Maps: 0 Color Items: 0 Greyscale Items: 0 Other Items Scannable by a Large Scanner 0 Poor Quality Originals: OVERSIZED (Non-Scannable) 0 Other: 0 Logs of various kinds: NOTES: Scanning Preparation , x 30 = 3 () 0 Other:: I ,() Date: 10 I ð if /s/ V11, , ., 1111111111111111111 Date: t D J () f.:, /s/ Vt1P I J + '{)¡J = TOTAL PAGES l~. (c~ount. .d. oes~otJnclude cover sheß J!J Oate: I f) {, " if /s/ r , 1111111111111111111 BY: Helen (Maria'; Project Proofing BY: Helen ( Maria~) BY: Helen ~aria ) Production Scanning Stage 1 Page Count from Scanned File: (p() (Count does include cover sheet) Stage 1 Page Count Matches Number in Scanning Preparation: Heier( Maria) If NO in stage 1, page(s) discrepancies were found: (/ YES. !' r Date: 1°,. ¡~ {Jif YES NO NO /s/ mP BY: BY: Helen Maria Date: Is/ II - I Scanning is complete at this point unless rescanning is required. ReScanned BY: Helen Maria Date: Is/ Comments about this file: Quality Checked 1111111111111111111 8/24/2004 Well History File Cover Page.doc I { J¡i-~\.f DATA SUBMITTAL COMPLIANCE REPORT 9/7/2004 Permit to Drill 2021470 Well Name/No. MILNE PT UNIT SB S-03L 1 Operator BP EXPLORATION (ALASKA) INC MD 1 0260 ~ TVD 4193 --- Completion Date 8/11/2002./ Completion Status 1-01L Current Status 1-01L REQUIRED INFORMATION S j14 (,!--. ~ /J.,V; À,í'i l- API No. 50-029-23105-60:00 UIC N ------ ------~ + Mud Log No Samples No Directional Survey Yes ----- ~--------~'-----~-~ ~ - DATA INFORMATION Types Electric or Other Logs Run: MWD, LWD, GR, RES, ABIIIFR /CASANDRA Well Log Information: -_._~~"_._-~~---- ~- (data taken from Logs Portion of Master Well Data Maint) Electr Digital Dataset Med/Frmt Number Name LIS Verification ~31 LIS Verification Logl Data Type Rpt - ~D Log Log Run Scale Media No 1 1 Interval OH / Start Stop CH Received 73 1 0207 C-ãSê 12/3/2002 (¡-. ,........-- , 73 10207 Gase- 12/3/2002 u¡z.v.- 1f9J3 10260 Open 8/27/2002 ~ 10260 Open 8/27/2002 (Jill 0 (~D Directional Survey Directional Survey Rpt Directional Survey Rpt Directional Survey 'Í~D CAse ('11956 LIS Verification v5D C Pdf (.............--~956 I nduction/Resistivíty 3D C Pdf (,-11956 Induction/Resistivity Well Cores/Samples Information: 6913 10260 Open 8/27/2002 1 6913 10260 Open 8/27/2002 1,2,5,6, 73 1 0261 Open 6/2/2003 Final 110 10260 Open 6/2/2003 Comments -~~^~---_.-----_.._------_.--~ f í I~ í( MWD A Directional Survey Log is required to be submitted. This record automatically created from Permit to Drill Module on: 7/11/2002. MWD '-"- Final 110 MWD - ROP, DGR, EWR - MD 4192 Open 6/2/2003 MWD - DGR, EWR - TVD 25 25 Name Interval Start Stop Sample Set Number Comments Sent Received --~----~--- - DATA SUBMITTAL COMPLIANCE REPORT 9/7/2004 Permit to Drill 2021470 Well Name/No. MILNE PT UNIT SB S-03L 1 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23105-60-00 MD 10260 TVD 4193 Completion Date 8/11/2002 Completion Status 1-01L Current Status 1-01L UIC N Well Cored? ADDITIONAL INFORMATION y'Z0 Daily History Received? GJ/N G)/N Chips Received? ~ Formation Tops Analysis Received? ~ ------'---~~~-~.'---'- ---~------_____n__-___----.- '-"', Comments: Compliance Reviewed By: ~ Date: )~ ~ ~ltt-. ~q- ~1==~= -, ê)o:9'-I'/? -# 1/95'07 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7tß Avenue, Suite 100 Anchorage, Alaska 99501 April 14, 2003 RE: MWD Fonnation Evaluation Logs: l\1PS-03 L1, AK-MW-22 127 MPS-03 Ll: Digital Log Images: 50-029-23105-60 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATIACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 RECEIVED Date: JUN 0 2 2003 Alaaka 0;1 & Gas Cons. Comn1i8IiIn And10rage d-O~-l Lf1 Sign~é'\~~ ~'-~ ~~'~ ~ ~ ~O¿;)-ILj 7 / 133 ! WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 33 3 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 November 27, 2002 RE: MWD Formation Evaluation Logs MPS-03 L1, AK-MW-22127 1 LIS formatted Disc with verification listing. API#: 50-029-23105-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Si~r>~o~ RECEIVED DEe 03 zoo, A pol"f1Ø ,c.:.;, ~w ~~~ ~ ~i$ C;" ~ AnN.""":':............... ......WI. .,'~' Çqmmi,MiAA. ',.,., "~~~J" ,. ~l ( (' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised 10/03/02, Start Production 1. Status of Well IBI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface ""-'.- -----"~N'" 3368' NSL, 4744'.W~L, SEC. 07, T12N, R11 E, UM¡ r:;~'¡)i~,):,¡O¡,j 1 At top of productive Interval ~ DATE ¡ 4090' NSL, 989' WEL, SEC. 07, T12N, R11 E, UM (OA) .1 ~.~rQk. ,,' At total depth ~ W.p'r:¡ÐJ ¡ 621' NSL, 1157'WEL, SEC. 07, T12N, R11E, UM (OA) i.~:::::J 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designaflon and Senal No. KBE = 66.2' ADL 380110 12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband. 8/6/2002 8/8/2002 8/11/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 10260 4193 FT 10260 4193 FT 0 Yes IBI No 22. Type Electric or Other Logs Run MWD , LWD , GR , RES, ABI/IFR I CASANDRA 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE 20" 92# H-40 28' 112' 42" 7-5/8" 29.7# L-80 28' 6943' 9-7/8" 4-1/2" 12.7# L-80 6921' 10204' 6-1/8" Classification of Service Well 7. Permit Number 202-147 8. API Number 50- 029-231 05-60 9. Unit or Lease Name Milne Point Unit 10. Well Number MPS-03L 1 11. Field and Pool Milne Point Unit 1 Schrader Bluff 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost N/A MD 1800' (Approx.) CEMENTING RECORD 260 sx Arctic Set (Approx.) 1358 sx PF 'LI, 308 sx Class 'G' Uncemented Slotted Liner TUBING RECORD SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 6835' 3-1/2", 9.2#, L-80 6835' - 6887' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 33 Bbls of Diesel 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner 25. MD TVD TVD MD 6969' -10160' 4178' - 4199' 27. Date First Production September 8, 2002 Date of Test Hours Tested 9/11/2002 12 Flow Tubing Casing Pressure Press. PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR OIL-BBL TEST PERIOD 1995 GAs-McF 643 GAs-McF WATER-BBL 3046 WATER-BBL CALCULATED 24-HoUR RATE OIL-BBL AMOUNT PULLED PACKER SET (MD) 6835' CHOKE SIZE 176 I 64ths OIL GRAVITY-API (CORR) GAS-OIL RATIO 322 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. S'R'mTV ED No core samples were taken. 28. RBDMS 8Fl OCT 9 2002 G(C Form 10-407 Rev. 07-01-80 OCT 0 4 2002 Alaska OU& Gas Gons. Commtsslon Anchorage Submit In Duplicate ( ( 29. Geologic Markers Marker Name Measured Depth SBF2-NA 6605\ SBF1-NB 6661' SBE4-NC 6730' SBE2-NE 6762' SBE1-NF 6875' TSBD-OA 6954' 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 4035' 4059' 4087' 4100' 4146\ 4174' RI€I'VED OCT 0 4 2002 Alaska OiJ& Gas Cons. Commlssfon Anchorage 31. List of Attachments: Post Rig Summary. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Sondra ~". Title Technical Assistant MPS-03L 1 Well Number 202-147 Permit No. / Approval No. Date lO.- 0 -~-O 7- Prepared By Name/Number: Sondra Stewman, 564-4750 Drilling Engineer: Steve Campbell, 564-4401 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 3...# ~ p" ( ( Well: Field: API: Permit: MPS-03 & L 1 Milne Point Unit 50-029-23105-00/50-029-23105-60 202-146/202-147 Rig Accept: 07/27/02 Rig Spud: 07/28/02 Rig Release: 08/11/02 Drilling Rig: Doyon 141 POST RIG WORK 08/13/02 Pulled BPV, Pulled Ball & Rod, Pulled RP, Set DGLV, Pulled RHC body. Lost 2.62" roller out of roller stem. 08/17/02 Set Jet Pump (BP-1068, 13A). Note: Had to jar pump several times to keep moving after 3700' wlm. 08/30/02 Pressure tested surface equipment to 3000 psi. Pumped 45 bbls MeOH at 1.25 bpm w/ 1250-psi max down the IA. Switched to the tubing and PT to 2500 psi. Pumped 35 bbls of diesel down tubing at 1.40 bpm wi 900-psi max. 09/08/02 Arrived location, held pre-job safety meeting, Pressure tested to 3800 psi. Start down the IA with 45 bbls MeOH @ 1 bpm wi 975 psi max. Switched to tubing and pumped 35 bbls diesel @ 1.4 bpm wi 1150 psi max. 09/09/02 Pulled & Rerun New Jet Pump, Old one had (2) pieces of 3/16" shear stock in throat from kick over tool. Other than the shear stock there were no visible signs of damage to the pump. Popped well, well lifting. . . :r ' STATE OF ALASKA . ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ( 1. Status of Well DšI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 202-147 3. Address 8. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-23105-60 4. Location of well at surface ~TòéAt~...;t. 9. Unit or Lease Name 3368' NSL, 4744' WEL, SEC. 07, T12N, R11E, UMl Mine Po nt Un t At top of productive interval . ~'.:,.. i i i 4090' NSL, 989' WEL, SEC. 07, T12N, R11 E, UM (OA) ~~~ f10. Well Number At total depth ~ 8. ~lr-&J MPS-03L 1 621' NSL, 1157'WEL, SEC. 07, T12N, R11E, UM (OA) ~\...~,.)'.""<;l~~~-.'J' ." 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff KBE = 66.2' ADL 380110 12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband. 8/6/2002 8/8/2002 8/11/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 10260 4193 FT 10260 4193 FT DšI Yes 0 No 22. Type Electric or Other Logs Run MWD , LWD , GR , RES, AB / IFR / CASANDRA 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD 20" 92# H-40 28' 112' 42" 260 sx Arctic Set (Approx.) 7-5/8" 29.7# L-80 28' 6943' 9-7/8" 1358 sx PF 'L', 308 sx Class 'G' 4-1/2" 12.7# L-80 6921' 10204' 6-1/8" Uncemented Slotted Liner Classification of Service Well 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) AMOUNT PULLED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner 6969' - 10160' 4178' - 4199' 26. TUBING RECORD SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 6835' 3-1/2'" 9.2#, L-80 6835' - 6887' ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 33 Bbls of Diesel PACKER SET (MD) 6835' 25. MD TVD MD TVD 27. Date First Production Not on Production Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) NIA PRODUCTION FOR OIL-BBL TEST PERIOD GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28 CORE DATA :'f"" ,I. ".~' ii'". . Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water.(:~SJbrfm cHöri ¿~'iJ¡. OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR) No core samples were taken. Form 10-407 Rev. 07-01-80 h 0 M S B FL SEP I I 2002 Submit In Duplicate '" (' (' 29. Geologic Markers Marker Name Measured Depth SBF2-NA 6605' SBF1-NB 6661' SBE4-NC 6730' SBE2-NE 6762' SBE1-NF 6875' TSBD-OA 6954' 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 4035' 4059' 4087' 4100' 4146' 4174' 31. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Integrity Test Summary. 32. I hereby certify that the foregoing is true ~correct to the best of my knowledge Signed sondra~ Tille Technical Assistant MPS-03L 1 202-147 Well Number Permit No. I Approval No. Date c:::s=1- 0-<1: ' CJ7- Prepared By Name/Number: Sondra Stewman, 564-4750 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Legal Name: MPS-03 Common Name: MPS-03 . T8Ït Date. . Test Type 8/3/2002 FIT Test Depth (TMD) 7,350.0 (ft) Leak-Off Test Summary Test Depth (TVD) 4,232.0 (ft) AMW 8.60 (ppg) . Surfåéè p,reå8ure '~.LokoffP~Ur. (B~P) 650 (psi) 2,541 (psi) Page 1 of 1 EMW 11.56 (ppg) ~. .-, Printed: 8/1212002 2:52:28 PM ( Page 1 of6 BP-. ..: ;~~Rl!r@~.~I1~.>~Pl11m~I)f~~~Q()rt ' -,(", . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-03 MPS-03 DRILL +COMPLETE DOYON DOYON 141 , "0' . ,. - ,. ' - . r. - -. Datè. . : From ~Tó'Hours..'Task .Code,N()I\ Pha~.. 7/2712002 14:30 - 18:00 3.50 MOB P 18:00 - 19:30 1.50 RIGU P 19:30 - 22:00 2.50 RIGU P 22:00 - 00:00 2.00 RIGU P 00:00 - 01 :00 1.00 RIGU P 01 :00 - 08:00 7.00 DRILL P 08:00 - 09:30 1.50 DRILL P 09:30 - 10:00 0.50 DRILL P 10:00 - 12:00 2.00 DRILL P 12:00 - 12:30 0.50 DRILL P 12:30 - 13:00 0.50 DRILL P 13:00 - 00:00 11.00 DRILL P INT1 INT1 INT1 INT1 PRE PRE 7/2812002 PRE PRE PRE INT1 INT1 INT1 7/29/2002 00:00 - 10:00 10.00 DRILL P 10:00 - 11 :30 1.50 DRILL P 11 :30 - 14:30 3.00 DRILL P 14:30 - 16:30 2.00 DRILL P 16:30 - 18:00 1.50 DRILL P 18:00 - 22:30 4.50 DRILL P 22:30 - 23:30 1.00 DRILL N 23:30 - 00:00 0.50 DRILL P 7/30/2002 00:00 - 23:00 23.00 DRILL P 23:00 - 23:30 0.50 DRILL N 23:30 - 00:00 0.50 DRILL P 7/31/2002 00:00 - 06:00 6.00 DRILL P INT1 INT1 INT1 INT1 INT1 INT1 RREP INT1 INT1 INT1 RREP INT1 INT1 INT1 06:00 - 08:30 2.50 CASE P INT1 08:30 - 15:30 7.00 CASE P INT1 15:30 - 16:30 1.00 CASE P INT1 16:30 - 18:30 2.00 CASE P INT1 Start: 7/27/2002 Rig Release: 8/11/2002 Rig Number: 141 Spud Date: 7/28/2002 End: . ",,-,:'.: ',;, .-5." ' . . Ðescriptionof Operations MOVE RIG FROM MPS-05 TO MPS-03 RIG UP ON MPS-03 RIG ACCEPT TO DRILL @ 19:30 7/27/2002 NIPPLE UP DIVERTER LOAD PIPE SHED,TAKING ON WATER FOR SPUD MUD FINISH LOADING PIPE SHED PICKING UP DRill PIPE AND STANDING IN DERRICK HAVE 110 STANDS, MIXING SPUD MUD PICK UP HWDP AND JARS NMDC STAND IN DERRICK FUNCTION TEST DIVERTER, WITNESS OF DIVERTER TEST WAS WAIVED BY CHUCK SCHEVE AOGCC PICK UP BHA #1 CIRC. AND CHECK MUD SYSTEM FOR LEAKS PRE-SPUD MEETING SPUD WELL, DIRECTIONAL DRILL 112'TO 1475' WITH 1700 PSI 450 GALS PER MIN. 6O-S0 RPMS 15-3OK BIT wr. AST 3.25 ART 3.25 TQ 5 DIRECTIONAL DRILL 1475' TO 3527 1 WITH 2800 PSI 450 GALS PER MIN. 80 RPMS 25-30K BIT WT. AST1.5 ART 4 TQ 4-6000 CIRC. THREE BOTTOMS UP,WITH 2800 PSI 450 GAL PER MIN. 80 RPMS, STANDING BACK ONE STAND PER BOTTOMS UP. PUMP OUT WITH FULL DRILLING RATE TO BHA TRIP OUT AND IN WITH BHA, CHANGE OUT BIT, PULSE TEST MWD TRIP IN HOLE WASHED 90 FT. TO BOTTOM @ 3527 DIRECTIONAL DRILL 3527' TO 4458 WITH 2900 PSI 450 GALS PER MIN. 80 RPMS 25-30K BIT WT. TQ 4-7000 PULL ONE STAND, CIRC THRU HEAD PIN, CHANGE OUT SWIVEL PACKING ON TOP DRIVE, WASH TO BOTTOM DIRECTIONAL DRILL 4458' TO 4465' WITH 2900 PSI 450 GALS PER MIN. 80 RPMS 25-30K BIT WT. AST.75 ART 1.75 TQ 4-7000 DIRECTIONAL DRILL 4465' TO 6842 WITH 3280 PSI 500 GALS PER MIN. 80 RPMS 25-30K BIT WT. TQ 7000-1000 CIRC AND CHANGE LINER IN ONE PUMP DIRECTIONAL DRILL 6842 TO 6880' WITH 3280 PSI 500 GALS PER MIN. 80 RPMS 25-30K BIT WT. TQ 7000-1000 AST 11.5 ART 3.75 DIRECTIONAL DRill 6,880 TO 7 5/8 CASING POINT AT 7,320' WITH 3600 PSI 500 GALS PER MIN. 80 RPMS 25-30K BITWT. TQ 7,000-10,000 AST 3.5 ART 1.25 CIRC, THREE BOTTOMS UP 4,000 PSI 525 GALS MIN.,1 00 RPMS, STANDING BACK ONE STAND PER BOTTOMS UP PUMP OUT TO HWDP, WITH FUll DRILLING RATE ATTEMPT TO PULL @ 3,000 FT AND 1500, WEll SWABED SLIP AND CUT DRILLING LINE, SERVICE TOP DRIVE TRIP IN BRIDGE @ 1,400 AND 2.200 WORKED THRU, TRIP IN TO 3,400 TO 4,275, HOLE ACTING STICKY. Printed: 8112/2002 2:52:35 PM BP 9.p~rél'i9D~~~tnmélry~,port Pase2of6 Legal Well Name: MPS-03 Common Well Name: MPS-03 Spud Date: 7/28/2002 Event Name: DRILL +COMPLETE Start: 7/27/2002 End: Contractor Name: DOYON Rig Release: 8/11/2002 Rig Name: DOYON 141 Rig Number: 141 Date. .From~To Hours... . Task . Code.;NPT . Phase. . Description of Operatio",s 7/31/2002 18:30 - 00:00 5.50 CASE P INT1 PUMPING OUT TO HWDP, AND TRIP OUT WITH BHA DOWN LOAD MWD 8/1/2002 00:00 - 01 :00 1.00 CASE P INT1 LAY DOWN MOTOR AND MWD 01 :00 - 02:30 1.50 CASE P INT1 PICK UP HOLEOPENER AND TRIP IN TO 1,350 02:30 - 06:00 3.50 CASE P INT1 REAMING 1,350 TO 2900 WITH 150 RPM 550 GALS MIN. 1600 PSI 06:00 - 06:30 0.50 CASE P INT1 TRIP IN TO 4,200' 06:30 - 13:00 6.50 CASE P INT1 REAMING 4,200 TO 7,320 WITH 150 RPM 550 GALS MIN. 3,300 PSI, TQ 8,000 13:00 - 15:30 2.50 CASE P INT1 CIRC, THREE BOTTOMS UP, WITH 150 RPMS, 3,300 PSI, 550 GALS PER MIN., STANDING BACK ONE STAND PER BOTTOMS UP. 15:30 - 18:00 2.50 CASE P INT1 SLUG PIPE, TRIP OUT TO BHA 18:00 - 19:30 1.50 CASE P INT1 LAY DOWN BHA 19:30 - 21 :00 1.50 CASE P INT1 CLEAR FLOOR, RIG UP CSG TOOLS, PJSM 21 :00 - 00:00 3.00 CASE P INT1 RUNNING 7 5/8 29.7# l-80 BTC TO 2,300' 81212002 00:00 - 05:00 5.00 CASE P INT1 RUNNING 7 5/8 29.7# L-80 BTC FT FROM 2300' TO 7,301 BRIDGE @ 2,700 AND TIGHT FROM 2,700 TO 3,600 - CASING HANGING UP EVERY 40' WHEN CENTRALIZER WENT BY TIGHT SPOT - WHEN CENTRALIZERS BELOW 2,700', NO PROBLEM - LANDED CSG 40K STRING WT. LEFT 05:00 - 05:30 0.50 CASE P INT1 RIG DOWN FRANKS TOOL, RIG UP CEMENT HEAD 05:30 - 08:00 2.50 CASE P INT1 CIRCULATE AND CONDITION MUD FOR CEMENT AT 6 BPM 350 PSI - MUD AT BOTTOMS UP 250 SEC/QT, 9.6 PPG - CIRCULATE TWO CASING VOLUME - FINAL MUD WT. 9.2 PPG, 46 SEC/QT VISCOSITY 08:00 - 11 :30 3.50 CASE P INT1 CEMENT 7 5/8 PRODUCTION CASING AS FOLLOWS: 50 BBLS OF WATER AHEAD + 50 BBLS OF ALPHA SPACER MIXED AT 10.2 PPG, FOLLOWED BY 1155 SX CLASS 'l' MIXED AT 10.7 PPG, 854 BBLS OF SLURRY PUMPED AT AVERAGE 6.5 BPM 350 »>1150 PSI. AT 662 BBlS OF LEAD SLURRY AWAY. RETURNS STARTED TO DECREASE, SLOWED PUMP RATE TO 5 BPM. AT 750 BBlS AWAY, NO RETURNS. CONTINUE PUMPING LEAD SLURRY FOR ADDITIONAL 104 BBlS AT 2 TO 4 BPM, WORK PIPE, NO SUCCESS IN GETTING RETURNS BACK. TAILEDWtTH 300 SX CLASS 'G' W/1 % CACL MIXED AT 15.8 PPG, 61 BBLS OF SLURRY - DROP TOP PLUG WITH 30 BBlS OF WATER. 11:30 -12:30 1.00 CASE P INT1 DISPLACE WITH 9.2PPG MUD AT 6 BPM 1000 »> 1200 PSI. WITH RIG PUMP. BUMP PLUG TO 1000 PSI OVER- FLOATS OK, NO CEMENT TO SURFACE - CIP AT 1230 HRS 8/2/02 - RIG PUMP EFFICIENCY 96% 12:30 - 13:30 1.00 CASE P INT1 LAY DOWN LANDING JT,FLUSH OUT DIVERTER 13:30 - 15:30 2.00 CASE P INT1 NIPPLE DOWN, DIVERTER 15:30 - 17:30 2.00 CASE N CEMT INT1 RIG UP AND RUN 729 FT OF 1" PIPE FOR TOP JOB 17:30 - 19:00 1.50 CASE N CEMT INT1 CIRC DOWN 1 H WITH 150 BBlS OF WATER 1.5 BBLS MIN 1000 PSI, DYE AND SPACER TO SURFACE AFTER WE PUMPED 50 BBLS WATER. 19:00 - 21:00 2.00 CASE N CEMT INT1 CEMENT DOWN 1" WITH 1.5 BBlS MIN., 1200 PSI, PUMPED 250 SXS. CLASS l MIXED @ 10.7. 150 BBlS PUMPED, 22 BBLS TO SURFACE. Printed: 811212002 2:52:35 PM Page 3 of6 /....BP 'QP..'.....~ra.;...~~ti.)).~.',".~:.:S. :..J~m.'.. m.:_..,~Jj:'J~~~rt....,. ,-', " ... . -' . .:" '. ~- " ....' . ",.--" , ~.-...... MPS-03 MPS-03 DRILL +COMPLETE Start: 7/27/2002 DOYON Rig Release: 8/11/2002 DOYON 141 Rig Number: 141 1.00 CASE P INT1 ORIENT AND NIPPLE UP WELL HEAD, TEST TO 1000 PSI FOR 10MIN. NIPPLE UP BOPS NIPPLE UP, BOPS RIG UP AND TESTING BOPS 250 LOW 4,000 HIGH, ANNULAR 250-2500 PSI, WITNESS OF BOP TEST WAS WAVIER BY JOHN CRISP AooGC @ 22:00 8/2/2002, INSTALL WEAR RING NIPPLE UP FLOW LINE RISER PICKING UP BHA, #4 PDC SEC 2643 WITH 3/12 JETS, 4 3/4 SPERRYDRILL LOPE 1.5 MOTOW, FLOAT SUB, 43/4 DGRlEWRlDM,HAND OFF SUB, 3 FLEX COLLARS,JARS,2 -4 DP. TRIPPING IN TO 7198 CIRC FOR CSG TEST TEST CSG TO 4,000 PSI FOR 30 MIN. REPAIR AIR COMPRESSORS DRILL FLOAT AND SHOE AND NEW HOLE, FROM 7320' TO 7,350' CIRC FOR FIT TEST FIT TEST WITH, 8.6 MUD, TVD 4232, 650 PSI = 11.5 CIRC. AND DISPLACE HOLE WITH NEW 9.1 FLOW-PRO MUD PROD1 DRILL DIRECTIONAL 7,350' TO 8,162' WITH 80 RPMS, 2-4,000 BIT WT., 1860 PSI, 250 GALS MIN, TO 5,000, AST 1 HR, ART 4 HR PROD1 DRILL DIRECTIONAL 8,162' TO TD @ 10270' WITH 80 RPMS, 2-4,000 BIT WT., 1950 PSI, 250 GALS MIN, TO 7,000, AST 2.5 ART 7.75 COMP CIRC, FOUR BOTTOMS UP WITH 280 GALS MIN. 2400 PSI ,100 RPMS COMP PUMPING OUT TO CSG SHOE, DISPLACING HOLE WITH NEW MUD COMP PUMPING OUT TO CSG SHOE, DISPLACING HOLE WITH NEW MUD COMP TRIPPING OUT FOR LINER COMP STAND BACK BHA COMP RIG UP CSG TOOLS AND PJSM COMP PICKING UP 4.512.6# L-80 IBT SLOTTED LINER, TOTAL 76 JTS COMP PICKING UP LINER HANGER COMP TRIPPING IN WITH LINER, TO 10,256' LINER TOP, 7,200' COMP DROP BALL, CIRC BALL DOWN @ 1.5 BBLS MIN., SET LINER WITH 1,500 PSI, SHEAR BALL WITH 1900 PSI, SET PACKER WITH 45,000 # STRING WT. CUT DRILLING LINE AND SERVICE TOP DRIVE TRIPPING OUT, LAY DOWN RUNNING TOOL PJSM, PICK UP SPACE OUT JTS,WHIPSTOCK,AND BHA TRIPPING IN WITH WHIPSTOCK ORIENTING TO 8 DREGEES TO THE LEFT, TRYING TO SET ANCHOR ON WHIPSTOCK, WOULDN'T SET DFAL PROD2 TRIPPING OUT WITH WHIPSTOCK, DFAL PROD2 FINISH TRIP OUT WITH WHIPSTOCK, EMERG. SHEAR SUB Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: . Dåte .From...~~To 8/2/2002 21 :00 - 22:00 81312002 22:00 - 00:00 00:00 - 00:30 00:30 - 05:00 05:00 - 07:00 07:00 - 09:00 09:00 - 11 :00 11 :00 - 11 :30 11 :30 -12:30 12:30 -13:00 13:00 - 14:30 14:30 -15:00 15:00 -15:30 15:30 - 17:00 17:00 - 00:00 8/4/2002 00:00 -17:30 17:30 - 22:00 22:00 - 00:00 8/5/2002 00:00 - 01 :00 01 :00 - 03:00 03:00 - 04:00 04:00 - 04:30 04:30 - 06:30 06:30 - 07:00 07:00 - 09:30 09:30 - 10:30 10:30 - 11 :30 11 :30 - 14:00 14:00 - 17:00 17:00 - 19:30 19:30 - 20:30 20:30 - 00:00 8/6/2002 00:00 - 01 :30 2.00 CASE P 0.50 CASE P 4.50 CASE P 2.00 CASE P 2.00 CASE P 2.00 CASE P 0.50 CASE P 1.00 CASE P 0.50 CASE N 1.50 CASE P 0.50 CASE P 0.50 CASE P 1.50 CASE P 7.00 DRILL P 17.50 DRILL P 4.50 CASE P 2.00 CASE P 1.00 CASE P 2.00 CASE P 1.00 CASE P 0.50 CASE P 2.00 CASE P 0.50 CASE P 2.50 CASE P 1.00 CASE P 1.00 CASE P 2.50 CASE P 3.00 STWHIP P 2.50 STWHIP P 1.00 STWHIP P 3.50 STWHIP N 1.50 STWHIP N Spud Date: 7/28/2002 End: INT1 INT1 INT1 INT1 INT1 INT1 INT1 INT1 RREP INT1 INT1 INT1 INT1 INT1 COMP COMP PROD2 PROD2 PROD2 Printed: 811212002 2:52:35 PM Page 4 of6 .SP. . . .....-()per~~.gn~,.$l.1mm~ry.....~~P()rt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: . . , - . , . . .Däte.,.,..: .From~To. MPS-03 MPS-03 DRILL +COMPLETE bOYON DOYON 141 . .' '.... HøûrS.. .TaSk.~.Cpd~::'NPr: :Phasè:. 8/612002 1.50 STWHIP N DFAL PROD2 00:00 - 01 :30 01 :30 - 02:00 0.50 STWHIP N DFAL PROD2 02:00 - 03:30 1.50 STWHIP N DFAL PROD2 03:30 - 04:00 0.50 STWHIP N DFAL PROD2 04:00 - 07:00 3.00 STWHIP N DFAL PROD2 07:00 - 11 :00 4.00 STWHIP N DFAL PROD2 11 :00 - 11 :30 0.50 STWHIP P PROD2 11 :30 - 16:30 5.00 STWHIP P PROD2 16:30 -18:00 1.50 STWHIP P PROD2 18:00 - 20:30 2.50 STWHIP P PROD2 20:30 - 21 :30 1.00 STWHIP P PROD2 21 :30 - 22:00 0.50 STWHIP P PROD2 22:00 - 23:30 1.50 STWHIP P PROD2 23:30 - 00:00 0.50 STWHIP P PROD2 8n/2002 00:00 - 00:30 0.50 STWHIP P PROD2 00:30 - 02:30 2.00 STWHIP P PROD2 02:30 - 09:00 6.50 DRILL P PROD2 09:00 - 09:30 0.50 DRILL N DFAL PROD2 09:30 - 12:00 2.50 DRILL N DFAL PROD2 12:00 - 13:30 1.50 DRILL N DFAL PROD2 13:30 -16:00 2.50 DRILL N DFAL PROD2 16:00 -17:00 1.00 DRILL N DFAL PROD2 17:00 - 17:30 0.50 DRILL N DFAL PROD2 17:30 - 00:00 6.50 DRILL P PROD2 8/812002 00:00 - 17:30 17.50 DRILL P PROD2 Start: 7/27/2002 Rig Release: 8/11/2002 Rig Number: 141 Spud Date: 7/28/2002 End: . . .':'.Descnptioo.of.Opetations HAD CAME APART AND LEFT EVER THING BELOW IT IN HOLE, TOTAL OF 246.94 FT., TOP OF FISH IS @ 6961.05, SEAR SUB FISHING NECK IS 3 1/4, LAY DOWN WHIPSTOCK AND MILLS, MWD PICK UP FISHING BHA, 5 3/4 OVERSHOT WITH 3 1/4 GRAPPLE, BUMPER SUB,OIL JARS,12 DC,15 HWP TRIP IN WITH OVERSHOT TO 6961 WORKING OVER FISH AND JAR FREE, WITH 50,000 OVERPULL TRIPPING OUT WITH FISH - LD FISH AND FISHING TOOLS MAKE UP WHIPSTOCK ASSEMBLY - RIH TO 7207' ORIENT AND SET WHIPSTOCK TO 18 L OF HIGH SIDE - TOP OF WINDOW 6943' MILL WINDOW FROM 6943' TO 6967' - TOP WINDOW 6943 - BTM WINDOW 6955' - UPPER MILL 6.75" IN GAUGE - WOB 2K TO 15K - GPM 280 - PP 1450 - RPM 100 TO 130 - TO 7K ON BTM - 4K OFF BTM - PU 112K - SO 75K - ROT 87K PUMP SWEEP - CIRC 3 X - @ 290 GPM - PP 1500 - RPM 120 - TQ 4K - PU 112 - SO 78 - ROT 90 OBSERVE WELL - PUMP DRY JOB - POH TO BHA STAND IN DERRICK - DC'S - HWDP - LD BUMPER SUB - MWD - MILLS MAKE UP STACK WASHER - FLUSH OUT BOPS - LAY DOWN STACK WASHER PU MOTOR - MAKE UP BIT - PU - MWD - CHANGE OUT PULSER - ORIENT - UP LOAD MWD RIH TO 1250' RIG SERVICE TOP DRIVE - CHANGE OUT SPINNERS ON IRON ROUGHNECK RIH TO 6917' - ORIENT - CON'T RIH TO 6967' - NO PROBLEMS GOING THROUGH WINDOW DIRECTIONAL DRILL FROM 6967' TO 7507' - WOB 0 TO 3K - RPM 90 - TQ ON BTM 5K - TO OFF BTM 4K - GPM 250 - PP ON BTM 1870 - PP OFF BTM 1660 - PU 108K - SO 67 - ROT 82 OBSERVE WELL - PUMP OUT TO 7000' - PULL THROUGH WINDOW - NO PROBLEMS - TRIP FOR LWD FAILURE - LOG OUAIL TV POOR - PROBLEM WITH PULSER OBSERVE WELL - PUMP DRY JOB - POH TO BHA STAND BACK JARS - FLEX DC'S - DOWN LOAD MWD - CIO PULSER - GAUGE BIT - ORIENT - UP LOAD MWD - RIH W / BHA - PULSE TEST MWD TIH WITH 4" DP TO 6806' - FILLING PIPE EVERY 25 STANDS CUT DRLG LINE - RIG SERVICE TOP DRIVE - BLOCKS ORIENT TO HI-SIDE - TRIP THROUGH WINDOW - CON'T RIH TO 7461' - PRECAUCTIONARY WASH FROM 7461' TO 7507' DIRECTIONAL DRILL FROM 7507' TO 8348' - WOB 0 TO 5K- RPM 90 - TO ON BTM 8K - TO OFF BTM 6K - GPM 250 - PP ON BTM 1825 - OFF BTM 1700 - PU 120 - SO 61 - ROT 81 DIRECTIONAL DRILL FROM 8348' TO T.D. @ 10260' - WOB OT04K- RPM 9O-TQON BTM 7K- TO OFF BTM6K-GPM Printed: 8112/2002 2:52:35 PM BP Page 50f 6 .OperationsSummaryR.port . Legal Well Name: MPS-03 Common Well Name: MPS-03 Spud Date: 7/28/2002 Event Name: DRILL +COMPLETE Start: 7/27/2002 End: Contractor Name: DOYON Rig Release: 8/11/2002 Rig Name: DOYON 141 Rig Number. 141 Date From - To : Hours .....Task COde NPT . [)escriptign()f ppera~ons 8/8/2002 00:00 - 17:30 17.50 DRILL P PROD2 250 - PP ON BTM 1960 - OFF BTM 1760 - PU 120K - SO 46- ROT 82 17:30 - 21 :30 4.00 CASE P PROD2 CIRCULATE CLEAN HOLE 4 X BTM'S UP - 18000 STKS - 280 GPM -100 RPM 21 :30 - 00:00 2.50 CASE P PROD2 PUMP OUT TO 7461' - SPOTTING NEW MUD IN OPEN HOLE - 9.1 FlO-PRO - 8/9/2002 00:00 - 00:30 0.50 CASE P PROD2 CON'T PUMP OUT TO 7000' - PULL 1 STAND TO 6900' THROUGH WINDOW WITHOUT PUMP OR ROTATION - NO PROBLEMS COMING THROUGH WINDOW 00:30 - 02:30 2.00 CASE P PROD2 DOWN LOAD MWD - LAY DOWN BHA 02:30 - 03:30 1.00 CASE P COMP MAKE UP BHA #10 - (BAKER) WHIPSTOCK RETRIEVING TOOL ASSEMBLY 03:30 - 06:00 2.50 CASE P COMP RIH WITH (BAKER) RETRIEVING TOOL 06:00 - 06:30 0.50 CASE P COMP ORIENT RETRIEVING TOOL - LATCH ONTO (BAKER) WHIPSTOCK - PULL lOOSE - OBSERVE WELL 06:30 - 09:30 3.00 CASE P COMP POH WITH WHIPSTOCK TO BHA 09:30 - 12:00 2.50 CASE P COMP LAY DOWN BHA - WHIPSTOCK - RETRIEVING TOOL 12:00 - 15:00 3.00 CASE P COMP PJSM - RU CASING TOOLS FOR 4.5" SLOTTED LINER - PU 4.5" SLOTTED liNER - 81 TOTAL JTS RAN 15:00 -15:30 0.50 CASE P COMP MAKE UP (BAKER) HOOK WALL HANGER ASSEMBLY - CLEAR FOOR 15:30 - 17:30 2.00 CASE P COMP RIH WITH 4" DP /4.5" SLOTTED LINER TO 10204' - WENT THROUGH WINDOW ON FIRST ATTEMPT - HOOKED HANGER ON FIRST ATTEMPT @ 6955' 17:30 - 18:30 1.00 CASE P COMP DROP BALL - PRESSURE UP TO 3200 RELEASE HR TOOL - BLEED PRESSURE OFF - PU TO CHECK STRING WEIGHT - PRESSURE UP TO SHEAR BALL SEAT @ 4200 18:30 - 20:30 2.00 CASE P PROD2 OBSERVE WEll - PUMP DRY JOB - POH TO 3363' 20:30 - 22:30 2.00 CASE P PROD2 LAY DOWN 108 JOINTS OF 4" DP - SERVICE BREAK (BAKER) LINER RUNNING TOOL - LAY DOWN RUNNING TOOL 22:30 - 23:00 0.50 CASE P PROD2 SERVICE TOP DRIVE AND BLOCKS 23:00 - 00:00 1.00 CASE P PROD2 MAKE UP MULE SHOE - XO - RIH TO 2429' 8/1012002 00:00 - 01 :30 1.50 CASE P COMP CON'T RIH WITH 4" DRILL PIPE TP 6886' 01 :30 - 03:30 2.00 CASE P COMP BREAK CIRC - DISPLACE MUD WITH - 320 BBlS 8.8 SEAWATER - 50 BBL HI-VIS SPACER - 280 BBlS 8.8 SEAWATER - 330 BBlS 9.2 SEAWATER - GPM 441 - PP 960 - RPM 115 03:30 - 07:30 4.00 CASE P COMP OBSERVE WELL - WELL STATIC - LAYING DOWN 4" DRILL PIPE 07:30 - 08:00 0.50 CASE P COMP PUll WEAR RING 08:00 - 09:00 1.00 CASE P COMP CLEAR FLOOR OF ALL 4" RENTAL TOOLS 09:00 - 10:00 1.00 RUNCOF\IP COMP PJSM ON RUNNING COMPLETION - RU CASING TOOLS 10:00 - 19:30 9.50 RUNCOF\IP COMP PU AND RUN 164 JOINTS 4.5" l-80 12.6# IBT TUBING - 89 CANNON ClAMPS WERE USED ON I WIRE 19:30 - 21 :00 1.50 RUNCOF\IP COMP MAKE UP TUBING HANGER - INSTALL I WIRE TO HANGER - TEST - LAND TUBING - LAY DOWN LANDING JOINT - TEST lWC TO 1000 PSI 21 :00 - 21 :30 0.50 RIGD P COMP CHANGE BOTTOM RAMS FROM 4" TO 3.5" 21 :30 - 22:30 1.00 RIGD P COMP NIPPLE DOWN BOP'S 22:30 - 00:00 1.50 RIGD P COMP NIPPLE UP FMC ADAPTER FLANGE - 4 1/16 5K CIW TREE - TEST TUBING HANGER VOID TO 5K 8/1112002 00:00 - 01 :00 1.00 RIGD P COMP RIG UP HB&R - TEST LINES TO 5K - TEST TREE TO 5K Printed: 8112/2002 2:52:35 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date. ., From ...Tô 8/1112002 00:00 - 01 :00 01 :00 - 01 :30 01 :30 - 06:00 ( Page 6 of6 BP . " .~pe~ti~p~.;~,U.f.11~rJt¡¡rY: ttepørt Start: 7/27/2002 Rig Release: 8/11/2002 Rig Number: 141 - '. - .' . ,:' , . -. ~ ,,' , :'. - - . ' :' . - -,.' - . HoUrs. ...Tas~'::~:~,~'.i~.FY.T.;~'Phase.r. .', MPS-03 MPS-Q3 DRILL +COMPLETE DOYON DOYON 141 1.00 RIGD P 0.50 RIGD P 4.50 RIGD P COMP COMP COMP 06:00 - 07:00 1.00 RIGD P COMP 07:00 - 08:00 1.00 RIGD P COMP 08:00 - 10:00 2.00 RIGD P COMP 10:00 - 11 :00 11 :00 - 17:00 17:00 - 18:00 1.00 RIGD P 6.00 RIGD P COMP COMP 1.00 RIGD P Spud Date: 7/28/2002 End: .' . . peScriptionof Operations , . FOR 10 MINS PULL lWC CIRCULATE & HEAT 9.2 COMPLETION FLUID TO 100+ DEGREE'S TO SET PACKER - ADDED 25 GALS PER 100 BBLS CORRISION INHIBITOR - SPOTTED ON BACK SIDE OF TUBING DROP BALL- PRESSURE UP ON TUBING TO 4000 PSI TO SET PACKER - HOLD FOR 30 MINS - BLEED PRESSURE TO 2500 WITH 2500 PSI ON TUBING - PRESSURE UP TO 4500 PSI ON ANNULUS - HOLD PRESSURE FOR 30 MINS ON ANNULUS BLEED PRESSURE DOWN ON TUBING - SHEAR RP VAlVE - BLEED ALL PRESURE OFF BOTH TUBING I ANNULUS TO HB&R - PUMP 33 BBLS DIESEL IN ANNULUS WITH HB&R - SUCK BACK 2 BBLS WITH HB&R - SHUT IN WELL - RIG DOWN HB&R - U-TUBE WELL SET BPV - SECURE WELL CLEAN - ROCK WASHER - PITS PREPARE LOCATION TO MOVE RIG TO MPS-311- LEVEL LOCATION - MOVE DIRT FROM MPS-33 CELLAR - MOVE EQUIPMENT FOR RIG MOVE - SUCK OUT WELL CELLARS WITH SUPER SUCKER COMP CUT DRILLING LINE - SERVICE TOP DRIVE AND BLOCKS - RELEASE RIG @ 18:00 HRS Printed: 8112/2002 2:52:35 PM Õ?Od-I'/7 26-Aug-02 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-03L 1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 6,913.121 MD Window I Kickoff Survey 6,943.00 I MD (if applicable) Projected Survey: 10,260.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager RECEIVED Attachment( s) AUG 27 2002 Alaska Oß & Gas Cons. Commission Anchorage () BP EXPLORA TION (ALASKA) IN~~ . ~)j lþ~ Milne Point Unit . ~' BPXA Milne Point MPS, Slot MPS-03 MPS-03L 1 Job No. AKZZ22127, Surveyed: 8 August, 2002 SURVEY REPORT 19 August, 2002 Your Ref: API 500292310560 Surface Coordinates: 6000037.00 N, 566047.74 E (700 24' 37.9348" N, 1490 27' 43.8689" W) Kelly Bushing: 66.20ft above Mean Sea Level SPI!!.r'r"Y--SUI1 bAIL LING seAVICÉS A Halliburton Company Survey Ref: svy10167 Sperry-Sun Drilling Services . Survey Report for MPS-03L 1 Your Ref: API 500292310560 D~~ Job No. AKZZ22127, Surveyed: 8 August, 2002 BP EXPLORATION (ALASKA) INC. ~ t¡ BPXA Milne Point Unit . ïr~oint MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical £' Depth Incl. Azim. Depth Depth Northlngs Eastings Northings Eastings Rate Section Com t (ft) (ft) (ft) (ft) (ft) (ft) (ft) r/1 OOft) 6913.12 69.230 179.090 4094.09 4160.29 584.37 N 3759.01 E 6000654.59 N 569801.44 E 2625.33 Tie On Point 6943.00 70.800 179.100 4104.30 4170.50 556.30 N 3759.46 E 6000626.52 N 569802.13 E 5.254 2642.78 Window Point 6973.11 73.910 179.500 4113.43 4179.63 527.61 N 3759.81 E 6000597.84 N 569802.73 E 10.406 2660.53 7017.85 80.230 180.080 4123.43 4189.63 484.02 N 3759.96 E 6000554.26 N 569803.28 E 14.182 2687.21 7065.98 87.230 180.680 4128.69 4194.89 436.21 N 3759.65 E 6000506.44 N 569803.38 E 14.597 2716.07 7110.22 92.710 181.220 4128.71 4194.91 392.00 N 3758.91 E 6000462.22 N 569803.04 E 12.447 2742.42 7158.18 91.290 181.800 4127.04 4193.24 344.08 N 3757.65 E 6000414.30 N 569802.20 E 3.198 2770.61 7205.48 91.290 182.380 4125.97 4192.17 296.83 N 3755.92 E 6000367.03 N 569800.89 E 1.226 2798.02 7253.10 90.920 182.960 4125.05 4191.25 249.27 N 3753.71 E 6000319.45 N 569799.10 E 1.445 2825.23 7298.82 89.380 183.520 4124.93 4191.13 203.62 N 3751.12 E 6000273.79 N 569796.92 E 3.584 2850.98 7345.35 90.860 183.770 4124.84 4191.04 157.19 N 3748.16 E 6000227.33 N 569794.37 E 3.226 2876.92 7391.22 90.920 183.720 4124.12 4190.32 111.42 N 3745.17 E 6000181.54 N 569791.78 E 0.170 2902.42 7438.84 90.370 182.770 4123.59 4189.79 63.88 N 3742.47 E 6000133.98 N 569789.50 E 2.305 2929.24 7484.23 90.430 182.630 4123.27 4189.47 18.54 N 3740.34 E 6000088.62 N 569787.77 E 0.336 2955.16 7534.26 90.000 181.360 4123.08 4189.28 31.45 S 3738.59 E 6000038.61 N 569786.47 E 2.680 2984.23 7578.20 90.120. 180.770 4123.04 4189.24 75.39 S 3737.78 E 5999994.67 N 569786.04 E 1.370 3010.34 7627.23 90.230 180.470 4122.89 4189.09 124.41 S 3737.25 E 5999945.64 N 569785.94 E 0.652 3039.78 7671.94 90.250 179.790 4122.70 4188.90 169.12 S 3737.15 E 5999900.93 N 569786.23 E 1.522 3066.94 ~ 7719.90 90.620 179.210 4122.34 4188.54 217.08 S 3737.56 E 5999852.98 N 569787.08 E 1.434 3096.48 7765.39 90.990 179.460 4121.70 4187.90 262.56 S 3738.09 E 5999807.51 N 569788.01 E 0.982 3124.60 7813.73 93.020 179.810 4120.01 4186.21 310.87 S 3738.40 E 5999759.20 N 569788.74 E 4.261 3154.27 7859.41 92.950 178.960 4117.63 4183.83 356.48 S 3138.89 E 5999713.59 N 569789.64 E 1.865 3182.44 7908.49 93.200 178.600 4114.99 4181.19 405.48 S 3739.93 E 5999664.61 N 569791.11 E 0.892 3213.11 7952.61 93.330 178.820 4112.48 4178.68 449.52 S 3740.92 E 5999620.58 N 569792.49 E 0.578 3240.72 8000.79 93.450 178.450 4109.63 4175.83 497.60 S 3742.07 E 5999572.51 N 569794.06 E 0.806 3270.91 8046.24 93.820 177.690 4106.75 4172.95 542.93 S 3743.60 E 5999527.19 N 569795.99 E 1.857 3299.74 8094.12 92.650 178.090 4104.05 4170.25 590.70 S 3745.36 E 5999479.44 N 569798.17 E 2.582 3330.23 8140.00 90.550 179.950 4102.77 4168.97 636.55 S 3746.14 E 5999433.60 N 569799.36 E 6.113 3358.78 8188.43 90.550 178.710 4102.30 4168.50 684.98 S 3746.71 E 5999385.18 N 569800.36 E 2.560 3388.72 8233.01 90.740 178.260 4101.80 4168.00 729.54 S 3747.89 E 5999340.63 N 569801.93 E 1.096 3416.80 19 August, 2002 - 9:59 Page 2 0(5 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-03L 1 Your Ref: API 500292310560 Job No. AKZZ22127, Surveyed: 8 August, 2002 DI$ ' BP EXPLORATION (ALASKA) INC. . .~4 BPXA Milne Point Unit .' Q.J5i1ne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertic I ~ Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Sectlon.l . e t (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) ., . . 8279.27 90.490 177.370 4101.30 4167.50 775.76 S 3749.65 E 5999294.43 N 569804.10 E 1.998 3446.35 8326.15 90.860 181.400 4100.75 4166.95 822.63 S 3750.15 E 5999247.57 N 569805.02 E 8.632 3475.30 8374.71 91.110 181.740 4099.92 4166.12 871.16S 3748.82 E 5999199.02 N 569804.12 E 0.869 3503.80 8418.65 91.290 180.620 4099.00 4165.20 915.08 S 3747.92 E 5999155.10 N 569803.60 E 2.581 3529.84 8467.38 91.480 180.570 4097.82 4164.02 963.79 S 3747.41 E 5999106.38 N 569803.53 E 0.403 3559.11 8512.10 90.370 182.310 4097.10 4163.30 1008.49 S 3746.29 E 5999061.68 N 569802.80 E 4.615 3585.44 8561.21 90.430 182.440 4096.75 4162.95 1057.56 S 3744.25 E 5999012.59 N 569801.20 E 0.292 3613.71 8604.89 90.740 182.330 4096.31 4162.51 1101.20 S 3742.44 E 5998968.94 N 569799.77 E 0.753 3638.85 8653.99 90.740 181.760 4095.67 4161.87 1150.26 S 3740.68 E 5998919.86 N 569798.45 E 1.161 3667.35 8698.77 89.820 183.580 4095.45 4161.65 1194.99 S 3738.60 E 5998875.12 N 569796.76 E 4.554 3692.94 8746.83 89.690 182.630 4095.66 4161.86 1242.98 S 3735.99 E 5998827.11 N 569794.58 E 1.995 3720.10 8792.34 89.880 184.520 4095.83 4162.03 1288.40 S 3733.16 E 5998781.66 N 569792.14 E 4.174 3745.52 8839.06 90.250 184.950 4095.78 4161.98 1334.96 S 3729.30 E 5998735.07 N 569788.70 E 1.214 3770.82 8885.34 90.980 185.890 4095.28 4161.48 1381.03 S 3724.93 E 5998688.97 N 569784.74 E 2.572 3795.41 8933.45 90.800 185.890 4094.53 4160.73 1428.88 S 3719.99 E 5998641.07 N 569780.22 E 0.374 3820.64 8978.87 91.170 186.920 4093.75 4159.95 1474.01 S 3714.93 E 5998595.90 N 569775.56 E 2.409 3844.11 9026.42 89.320 186.900 4093.55 4159.75 1521.21 S 3709.21 E 5998548.65 N 569770.25 E 3.891 3868.33 9072.41 89.200 186.850 4094.14 4160.34 1566.87 S 3703.70 E 5998502.95 N 569765.15 E 0.283 3891 .77 9118.43 89.380 186.870 4094.71 4160.91 1612.55 S 3698.21 E 5998457.21 N 569760.06 E 0.394 3915.24 9165.69 89.630 186.490 4095.12 4161 .32 1659.49 S 3692.71 E 5998410.23 N 569754.98 E 0.962 3939.47 9214.96 88.950 186.360 4095.73 4161.93 1708.45 S 3687.20 E 5998361.23 N 569749.90 E 1 .405 3964.91 9259.96 88.340 186.600 4096.80 4163.00 1753.15S 3682.12 E 5998316.48 N 569745.22 E 1.457 3988.11 9307.65 89.010 184.720 4097.90 4164.10 1800.59 S 3677.42 E 5998269.00 N 569740.94 E 4.184 4013.28 9353.58 89.260 184.890 4098.59 4164.79 1846.35 S 3673.57 E 5998223.21 N 569737.49 E 0.658 4038.10 9400.46 88.890 184.700 4099.35 4165.55 1893.06 S 3669.65 E 5998176.46 N 569733.99 E 0.887 4063.45 9446.86 89.390 185.750 4100.05 4166.25 1939.26 S 3665.43 E 5998130.23 N 569730.17 E 2.506 4088.24 9498.83 92.400 187.070 4099.23 4165.43 1990.90 S 3659.63 E 5998078.55 N 569724.83 E 6.324 4115.08 9538.94 92.150 187.1 00 4097.64 4163.84 2030.67 S 3654.68 E 5998038.73 N 569720.24 E 0.628 4135.39 9587.99 86.800 182.080 4098.09 4164.29 2079.52 S 3650.76 E 5997989.84 N 569716.75 E 14.954 4162.04 9633.37 85.010 182.170 4101.33 4167.53 2124.76 S 3649.08 E 5997944.60 N 569715.47 E 3.949 4188.26 19 August, 2002 - 9:59 Page 3 0'5 DrillQllest 2.00.08.005 BP EXPLORATION (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Incl. Azlm. Depth Depth (ft) (ft) (ft) 9682.59 82.970 182.790 4106.49 4172.69 9726.83 81.350 183.060 4112.52 4178.72 9776.36 81.420 182.640 4119.94 4186.14 9820.88 81 .650 182.790 4126.49 4192.69 9870.15 85.620 184.140 4131.95 4198.15 9914.23 91.050 185.510 4133.23 4199.43 9964.81 90.430 183.970 4132.58 4198.78 10007.31 89.020 183.700 4132.79 4198.99 10055.88 88.400 183.280 4133.88 4200.08 10101.30 88.710 183.980 4135.02 4201.22 10149.39 94.500 189.440 4133.68 4199.88 10194.23 93.450 189.740 4130.57 4196.77 10260.00 93.450 189.740 4126.61 4192.81 Sperry-Sun Drilling Services Survey Report for MPS-03L 1 Your Ref: API 500292310560 Job No. AKZZ22127, Surveyed: 8 August, 2002 Local Coordinates Northlngs Eastlngs (ft) (ft) Global Coordinates Northlngs Eastlngs (ft) (ft) . ().. ~,(".. ^Q BPXA ~Jf~pOint MPS rt'cal ~~ Dogleg Va I Co~:nt Section Rate r/100ft) 2173.66 S 3646.96 E 5997895.68 N 569713.78 E 4.330 4216.36 2217.42 S 3644.73 E 5997851.89 N 569711.93 E 3.711 4241.25 2266.33 S 3642.29 E 5997802.96 N 569709.93 E 0.850 4269.11 2310.32 S 3640.21 E 5997758.96 N 569708.24 E 0.615 4294.24 2359.19 S 3637.25 E 5997710.07 N 569705.71 E 8.505 4321.66 2403.07 S 3633.54 E 5997666.15 N 569702.39 E 12.704 4345.45 2453.47 S 3629.36 E 5997615.72 N 569698.66 E 3.282 4372.84 2495.88 S 3626.52 E 5997573.29 N 569696.19 E 3.378 4396.41 2544.35 S 3623.56 E 5997524.80 N 569693.66 E 1.542 4423.59 2589.66 S 3620.69 E 5997479.46 N 569691 .19 E 1.685 4448.91 2637.36 S 3615.08 E 5997431.71 N 569686.00 E 16.543 4473.51 2681.47 S 3607.63 E 5997387.54 N 569678.94 E 2.435 4494.47 2746.17 S 3596.52 E 5997322.74 N 569668.40 E 0.000 4525.07 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 127.524° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 10260.00ft., The Bottom Hole Displacement is 4525.09ft., in the Direction of 127.364° (True). 19 August, 2002 - 9:59 Page 4 0'5 DrillQuest 2.00.08.005 BP EXPLORATION (ALASKA) INC. Milne Point Unit Comments -"_or' Measured Depth (ft) 6913.12 6943.00 10260.00 Sperry-Sun Drilling Services Survey Report for MPS-03L 1 Your Ref: AP/500292310560 Job No. AKZZ22127, Surveyed: 8 August, 2002 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 4160.29 4170.50 4192.81 584.37 N 556.30 N 2746.17 S Survey tool program for MPS-03L 1 From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) 0.00 177.00 19 August, 2002 - 9:59 0.00 177.00 176.99 10260.00 Comment 3759.01 E 3759.46 E 3596.52 E Tie On Point Window Point Projected Survey Survey Tool Description 176.99 Tolerable Gyro (MPS-03) 4192.81 AK-6 BP _IFR-AK (MPS-03) Page 5 0'5 ð ~. ~.. /tø-L::: BPXA MiI~oint MPS . ~~~ DrillQuest 2.00.08.005 a ~-)L/7 26-Aug-02 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-03L 1 MWD Deaf Deaf Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 6,913.12' MD Window I Kickoff Survey 6,943.00' MD (if applicable) Projected Survey: 10,260.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager RECEIVED Attachment(s) AUG 27 2002 Alaska Oi1 & Gas Cons. Commission Anchorage BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA Milne Point MPS, Slot MPS-03 MPS-03L 1 MWD Job No. AKMW22127, Surveyed: 8 August, 2002 ~~"'- SURVEY REPORT 19 August, 2002 Your Ref: API 500292310560 Surface Coordinates: 6000037.00 N, 566047.74 E (70024' 37.9348" N, 149027' 43.8689" W) Kelly Bushing: 66.20ft above Mean Sea Level 5p11r'r'V--IIUI1 OFtf L LING SS.AVlces A Halliburton Company Survey Ref: 5vy10168 Sperry-Sun Drilling Services . Survey Report for MPS-03L 1 MWD Your Ref: API 500292310560 Job No. AKMW22127, Surveyed: 8 August, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 6913.12 69.230 179.340 4094.09 4160.29 618.57 N 3753.56 E 6000688.73 N 569795.68 E 2600.18 Tie On Point 6943.00 70.800 179.100 4104.30 4170.50 590.49 N 3753.94 E 6000660.66 N 569796.31 E 5.308 2617.58 Window Point 6973.11 73.910 179.500 4113.43 4179.63 561.80 N 3754.29 E 6000631.98 N 569796.91 E 10.406 2635.33 7017.85 80.230 180.080 4123.44 4189.64 518.22 N 3754.45 E 6000588.40 N 569797.46 E 14.182 2662.00 7065.98 87.230 180.680 4128.69 4194.89 470.41 N 3754.13 E 6000540.59 N 569797.56 E 14.597 2690.87 7110.22 92.710 181.220 4128.71 4194.91 426.19 N 3753.39 E 6000496.36 N 569797.22 E 12.447 2717.22 7158.18 91 .290 181.800 4127.04 4193.24 378.28 N 3752.13 E 6000448.44 N 569796.38 E 3.198 2745.40 7205.48 91.290 182.380 4125.97 4192.17 331.02 N 3750.41 E 6000401.17 N 569795.07 E 1.226 2772.82 7253.10 90.920 182.960 4125.06 4191.26 283.46 N 3748.19 E 6000353.60 N 569793.28 E 1 .445 2800.03 7298.82 89.380 183.520 4124.94 4191.14 237.82 N 3745.61 E 6000307.93 N 569791.10 E 3.584 2825.78 7345.35 90.860 184.100 4124.84 4191.04 191.39 N 3742.51 E 6000261.48 N 569788.41 E 3.416 2851.61 7391.22 90.920 184.030 4124.13 4190.33 145.64 N 3739.26 E 6000215.70 N 569785.57 E 0.201 2876.89 7438.84 90.370 183.040 4123.59 4189.79 98.12 N 3736.33 E 6000168.15 N 569783.05 E 2.378 2903.51 7484.23 90.430 183.160 4123.27 4189.47 52.79 N 3733.87 E 6000122.81 N 569781.00 E 0.296 2929.17 7534.26 90.000 181.780 4123.09 4189.29 2.81 N 3731.72 E 6000072.81 N 569779.28 E 2.889 2957.90 7578.20 90.120 181 . 160 4123.04 4189.24 41.11 S 3730.59 E 6000028.88 N 569778.55 E 1.437 2983.77 7627.23 90.230 180.890 4122.89 4189.09 90.14 S 3729.71 E 5999979.85 N 569778.10 E 0.595 3012.93 7671.94 90.250 179.990 4122.70 4188.90 134.84 S 3729.37 E 5999935.14 N 569778.15 E 2.013 3039.89 - 7719.90 90.620 179.360 4122.34 4188.54 182.80 S 3729.64 E 5999887.19 N 569778.85 E 1.523 3069.31 7765.39 90.990 179.750 4121.70 4187.90 228.29 S 3729.99 E 5999841.71 N 569779.61 E 1.182 3097.30 7813.73 93.020 180.130 4120.01 4186.21 276.59 S 3730.04 E 5999793.40 N 569780.08 E 4.272 3126.76 7859.41 92.950 179.400 4117.63 4183.83 322.21 S 3730.23 E 5999747.79 N 569780.67 E 1.603 3154.70 7908.49 93.200 179.030 4115.00 4181.20 371.21 S 3730.90 E 5999698.79 N 569781.78 E 0.909 3185.08 7952.61 93.330 179.250 4112.48 4178.68 415.26 S 3731.56 E 5999654.76 N 569782.83 E 0.578 3212.43 8000.79 93.450 178.890 4109.63 4175.83 463.35 S 3732.34 E 5999606.68 N 569784.04 E 0.786 3242.34 8046.24 93.820 178.440 4106.75 4172.95 508.69 S 3733.40 E 5999561.34 N 569785.49 E 1.280 3270.80 8094.12 92.650 178.940 4104.05 4170.25 556.48 S 3734.49 E 5999513.56 N 569787.01 E 2.657 3300.77 8140.00 90.550 180.220 4102.77 4168.97 602.34 S 3734.83 E 5999467.71 N 569787.75 E 5.360 3328.97 8188.43 90.550 179.290 4102.31 4168.51 650.77 S 3735.04 E 5999419.29 N 569788.39 E 1.920 3358.63 8233.01 90.740 178.690 4101.80 4168.00 695.34 S 3735.82 E 5999374.73 N 569789.57 E 1.412 3386.40 ~.------------_.~~._--- 19 August, 2002 - 10:02 Page 20f5 DrillQlJest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-03L 1 MWD Your Ref: AP/500292310560 Job No. AKMW22127, Surveyed: 8 August, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 8279.27 90.490 177.990 4101.31 4167.51 741.58 S 3737.16 E 5999328.50 N 569791.31 E 1.607 3415.63 8326.15 90.860 181.860 4100.75 4166.95 788.44 S 3737.22 E 5999281.64 N 569791.79 E 8.292 3444.22 8374.71 91.110 182.410 4099.92 4166.12 836.96 S 3735.42 E 5999233.10 N 569790.41 E 1.244 3472.34 8418.65 91.290 181.270 4099.00 4165.20 880.87 S 3734.00 E 5999189.19 N 569789.39 E 2.626 3497.96 8467.38 91.480 180.990 4097.82 4164.02 929.58 S 3733.04 E 5999140.47 N 569788.86 E 0.694 3526.87 8512.10 90.370 182.660 4097.10 4163.30 974.26 S 3731.62 E 5999095.77 N 569787.83 E 4.484 3552.96 8561.21 90.430 182.970 4096.76 4162.96 1023.31 S 3729.21 E 5999046.70 N 569785.85 E 0.643 3580.92 8604.89 90.740 182.780 4096.31 4162.51 1066.94 S 3727.02 E 5999003.06 N 569784.05 E 0.832 3605.76 8653.99 90.740 182.000 4095.68 4161.88 1115.99 S 3724.97 E 5998953.99 N 569782.43 E 1.588 3634.01 8698.77 89.820 183.760 4095.46 4161.66 1160.71 S 3722.72 E 5998909.26 N 569780.58 E 4.435 3659.46 8746.83 89.690 183.170 4095.66 4161.86 1208.68 S 3719.82 E 5998861.26 N 569778.10 E 1 .257 3686.38 8792.34 89.880 184.950 4095.83 4162.03 1254.08 S 3716.59 E 5998815.84 N 569775.28 E 3.933 3711.47 8839.06 90.250 185.100 4095.78 4161.98 1300.62 S 3712.50 E 5998769.27 N 569771.60 E 0.855 3736.58 8885.34 90.980 186.350 4095.28 4161.48 1346.66 S 3707.88 E 5998723.18 N 569767.39 E 3.128 3760.96 8933.45 90.800 186.380 4094.54 4160.74 1394.47 S 3702.55 E 5998675.33 N 569762.48 E 0.379 3785.85 8978.87 91.170 187.480 4093.76 4159.96 1439.55 S 3697.07 E 5998630.20 N 569757.40 E 2.555 3808.96 9026.42 89.320 187.480 4093.55 4159.75 1486.69 S 3690.88 E 5998583.01 N 569751.63 E 3.891 3832.77 9072.41 89.200 187.190 4094.15 4160.35 1532.30 S 3685;01 E 5998537.35 N 569746.16 E 0.682 3855.89 9118.43 89.380 187.300 4094.72 4160.92 1577.95 S 3679.21 E 5998491.65 N 569740.76 E 0.458 3879.09 9165.69 89.630 186.630 4095.13 4161.33 1624.86 S 3673.48 E 5998444.69 N 569735.44 E 1.513 3903.12 9214.96 88.950 186.390 4095.74 4161.94 1673.81 S 3667.89 E 5998395.69 N 569730.29 E 1 .464 3928.51 9259.96 88.340 186.630 4096.80 4163.00 1718.51 S 3662.79 E 5998350.95 N 569725.59 E 1.457 3951.68 9307.65 89.010 184.890 4097.90 4164.10 1765.94 S 3658.01 E 5998303.48 N 569721.22 E 3.909 3976.78 9353.58 89.260 184.710 4098.60 4164.80 1811.70S 3654.16 E 5998257.68 N 569717.78 E 0.671 4001.61 9400.46 88.890 184.650 4099.35 4165.55 1858.42 S 3650.34 E 5998210.93 N 569714.37 E 0.800 4027.03 9446.86 89.390 186.040 4100.05 4166.25 1904.61 S 3646.02 E 5998164.70 N 569710.46 E 3.183 4051.74 9498.83 92.400 187.130 4099.24 4165.44 1956.23 S 3640.06 E 5998113.04 N 569704.96 E 6.160 4078.45 9538.94 92.150 187.070 4097.65 4163.85 1996.00 S 3635.11 E 5998073.23 N 569700.36 E 0.641 4098.75 9587.99 86.800 182.710 4098.10 4164.30 2044.84 S 3630.93 E 5998024.35 N 569696.61 E 14.068 4125.18 9633.37 85.010 182.630 4101.34 4167.54 2090.05 S 3628.82 E 5997979.12 N 569694.90 E 3.948 4151.05 19 August, 2002 - 10:02 Page 3 0'5 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-03L 1 MWD Your Ref: API 500292310560 Job No. AKMW22127, Surveyed: 8 August, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 9682.59 82.970 183.400 4106.49 4172.69 2138.93 S 3626.24 E 5997930.22 N 569692.76 E 4.427 4178.78 """""" 9726.83 81.350 183.360 4112.52 4178.72 2182.68 S 3623.66 E 5997886.45 N 569690.56 E 3.663 4203.38 9776.36 81.420 183.020 4119.94 4186.14 2231.57 S 3620.94 E 5997837.53 N 569688.27 E 0.693 4231.00 9820.88 81.650 183.100 4126.50 4192.70 2275.55 S 3618.59 E 5997793.54 N 569686.31 E 0.546 4255.91 9870.15 85.620 184.270 4131.96 4198.16 2324.40 S 3615.44 E 5997744.66 N 569683.59 E 8.396 4283.17 9914.23 91.050 185.680 4133.24 4199.44 2368.28 S 3611.62 E 5997700.75 N 569680.16 E 12.726 4306.87 9964.81 90.430 184.910 4132.58 4198.78 2418.64 S 3606.95 E 5997650.35 N 569675.94 E 1.954 4333.84 10007.31 89.020 184.490 4132.79 41 98.99 2460.99 S 3603.47 E 5997607.97 N 569672.83 E 3.462 4356.88 10055.88 88.400 183.670 4133.88 4200.08 2509.43 S 3600.01 E 5997559.51 N 569669.80 E 2.116 4383.64 10101.30 88.71 0 184.260 4135.03 4201.23 2554.72 S 3596.87 E 5997514.18 N 569667.06 E 1.467 4408.74 10149.39 94.500 189.850 4133.68 4199.88 2602.39 S 3590.98 E 5997466.47 N 569661.59 E 16.729 4433.10 10194.23 93.450 190.280 4130.57 4196.77 2646.43 S 3583.16 E 5997422.36 N 569654.16 E 2.530 4453.72 10260.00 93.450 190.280 4126.61 4192.81 2711.03 S 3571.44 E 5997357.66 N 569643.02 E 0.000 4483.78 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 127.524° (True). ~"'- Based upon Minimum Curvature type calculations, at a Measured Depth of 10260.00ft., The Bottom Hole Displacement is 4483.85ft., in the Direction of 127.202° (True). 19 August, 2002 - 10:02 Page 4 0'5 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for MPS-03L 1 MWD Your Ref: API 500292310560 Job No. AKMW22127, Surveyed: 8 August, 2002 . BP EXPLORATION (ALASKA) INC. Milne Point Unit BPXA Milne Point MPS Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 6913.12 6943.00 10260.00 4160.29 4170.50 4192.81 618.57 N 590.49 N 2711.03 S 3753.56 E 3753.94 E 3571.44 E Tie On Point Window Point Projected Survey Survey tool program for MPS-03L 1 MWD From To Measured Vertical Measured Vertical Depth Depth Depth Depth (ft) (ft) (ft) (ft) Survey Tool Description 0.00 177.00 0.00 177.00 176.99 10260.00 176.99 Tolerable Gyro (MPS-03 MWD) 4192.81 MWD Magnetic (MPS-03 MWD) 19 August, 2002 - 10:02 Page 5 0'5 DriflQuest 2.00.08.005 AI/ASIiA OIL AND GAS CONSERVATION COMMISSION If / TONY KNOWLES, GOVERNOR ~7~~! :} !Æ~!Æ~A!Æ 333 W. "JTH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Milne Point Unit 11PS-03L1 BP Exploration (Alaska), Inc. Permit No: 202-147 Surface Location: 3367' NSL, 4743' WEL, Sec. 07, T12N, RIlE, UM Bottomhole Location: 611' NSL, 1167', WEL, Sec. 07, T12N, RIlE, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above development well. The permit to drill does not exempt you from obtaining additional permits or approvals requITed by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. The permit is for a new wellbore segment of existing well MPU MPS 03, Permit No 202-145, API 50-029-23105. Production should continue to be reported as a function of the original API number stated above. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. . Sincerely, c~~)::r Chair BY ORDER OF THE COMMISSION DATED thisLifbday of July, 2002 cc: Department of Fish & Game, Habitat Section w/oencl. Department of Environmental Conservation w/o encl. 1 a. Type of work 0 Drill II Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3367' NSL, 4743' WEL, SEC. 07, T12N, R11E UM (As Staked) At top of productive interval 4229' NSL, 1083' WEL, SEC. 07, T12N, R11E, UM (OA) At total depth 611' NSL, 1167'WEL, SEC. 07, T12N, R11E, UM (OA) 12. Distance to nearest property line 13. Distance to nearest well ADL 047446,611' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 6778' MD Maximum Hole Angle 18. Casin~ Program Specifications $Ize Hole CasinQ WeiQht Grade CouplinQ 6-1/8"" 4-1/2" 12.7# L-80 BTC STATE OF ALASKA ./c , ALASKA t - AND GAS CONSERVATION COMMl..,ION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well IJ Exploratory 0 Stratigraphic Test II Development Oil IJ Service IJ Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE = 68' Milne Point Unit / Schrader 6. Property Designation Bluff ADL 380110 7. Unit or Property Name Milne Point Unit 8. Well Number MPS-03L 1 /' 9. Approximate spud date 07/23/02 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 10450' MD I 4201' TVD 0 17. Anticipated pressure {ser20 AAC 25.035 (e) (2)} 91 Maximum surface 1496 psig, At total depth (TVD) 4278' / 1924 psig Setting Depth T9P Botom Quantity of Cement I enQth Mt) TVn MD TVD (include staQe data) 3672 6778' 4208' 10450' 4201' Uncemented Slotted Liner UG~/"(OL ~~U~ 11. Type Bond (See 20 MC 25.025) Number 2S 100302630-277 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10463 feet 4261 feet feet feet Plugs (measured) Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD 82' 7016' 20" 7-5/8" 260 sx Arctic Set (Approx.) 639 sx PF 'L', 281 Class 'G' 112' 112' 3547' 4-1/2" Uncemented Slotted Liner 6916' - 10463' 4227' - 4261' r~.E(:EI ED Perforation depth: measured II Ii "'¡ n <10-°2 v.....:... '.... L 1.i true vertical 20. Attachments Alaska OU & Gas GOriS. CommiSSion . Filing Fee IJ Property Plat IJ BOP Sketch 0 DivelM*§ð . Drilling Program II Drilling Fluid Program IJ Time vs Depth Plot 0 Refraction Analysis IJ Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer NameINumber: Steve Campbell, 564-4401 Prepared By Name/Number: Sondra Stewman, 564-4750 21. I hereby certify that the for. ing is true and c¡rrect to the best of my knowledge '7 J O--~\.. Title Senior Drilling Engineer Date 7/ t/ 9/0 c2. Permit Number ..2.0.2-/7<7 Conditions of Approval: API Number 50- ðZ 9 - 231ð S--60 Samples Required 0 Yes 181 No Hydrogen Sulfide Measures 0 Yes ßI No Required Working Pressure for BOPE 0 2K 0 3K Other:~,~ + iSOt) E3 ~ ¥Q{)o fI c;l 4 Ongtnsl Signed By Commissioner Cammy Qechsli 1 ayaor ~ , A)p~rO al.Qate See cover letter 1 I ~) f;).... for other requirements Mud Log R quired 0 Yes .ag No Directional Survey Required EYes 0 No D4K D5K D10K D15K 0 3.5K psi for CTU Approved By Form 10-401 Rev. 12-01-85 by order of the commission L~ Date <1 I!;¡ /; ~ Submi~~ Triplicate Milne Po~c .VlPS-03 Well Permit ( IWell Name: I MPS-03 L 1 Drill and Complete Plan Summary I Type of Well (service / producer / injector): I Multi Lateral Producer "OA" & "DB" Surface Location: Target Location: TOP "OA" Target Location: BHL "OA" Well TD Target Location: TOP "OB" Target Location: BHL "OB" Well TD TOTAL DEPTH 19111 FNL, (336T FSL), 47431 FEL, (381 FWL), SEC. 7, T12N, R11E E=566047.81 N=6000037.19 10491 FNL, (42291 FSL), 1083' FEL, (36931 FWL), SEC. 7, T12N, R11 E E=569695.71 N=6000932.69 Z=4222' TVD 46681 FNL, (6111 FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E E=569659.00 N=5997314.00 Z=4201' TVD 1236' FNL, (40431 FSL), 1029' FEL, (37481 FWL), SEC. 7, T12N, R11 E E=569752.04 N=6000746.67 Z=4278' TVD 46681 FNL, (6111 FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E E=569659.00 N=5997314.00 Z=4261' TVD 46681 FNL, (6111 FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E E=569659.00 N=5997314.00 Z=4261' TVD I RiQ: I Doyon 141 1 I OperatinQ days to complete: 113 I 1 Max Inc: 191 I 1 KOP: I :67781 I KBE: 168 I I Well DesiQn (conventional, slimhole, etc.): I Conventional Grass Roots ML Producer I I I AFE Number: 1 I Estimated Start Date: 123 Jul2002 1 MD: 110450 1 I TVD: 14201 1 I Objective: I Schrader DB Sand Mud Program: 9-7/8" Surface Hole Mud Properties: Density (ppg) Funnel visc YP HTHP Spud - LSND Freshwater Mud pH API Fi Itrate LG Solids < 6.5 8.6 - 9.20 75 - 150 N/A <8 9.0-9.5 25 - 60 KCL-CaC03 Flow Pro pH API Filtrate LG Solids <12 6-1/8" Production Hole Mud Properties: Density (ppg) Funnel visc YP HTHP 8.6 - 9.20 40 55 22 - 27 <10 8.0 - 8.5 4 - 6 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR. 1 ( Milne Po(i' 'APS-03 Well Permit Cement Program: Casing Size 17.625-in 29.7-lb/ft L-80 BTC Intermediate Casing B . 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below aSlS permafrost Pump lead to surface before switching to tail. Have additional 300-sx lead cement on location. Total Cement Volume: 772-bbl Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg 50 bbl of Viscosified Spacer (Alpha Design) weighted to 10.50 Spacer ppg Lead 639 sx 10.7Ib/gal Class L - 4.15 cuft/sx (cement to surface) 281-sx 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at 5938' Tail Temp BHST ~ 80°F from SOR, BHCT 85° F estimated by Halliburton Evaluation Program: 9 7/8" Hole Section: Open Hole: Cased Hole: 6-1/8" Hole section: Open Hole: MWD/GR/RES IFR/CASANDRA N/a MWD/GR/RES ABI/IFR/CASANDRA Formation Markers: Formation Tops MDrkb TVDrkb . Estimated EMW (ft) (ft) Pore Pressure (pSI) (lb/gal)* Base Permafrost 1,936 1,816 816 8.65 Top Ugnu 5441 3,491 1570 8.65 Top Ugnu M NA Bottom U gnu NA NA 6438 4048 1820 8.65 NB 6507 4113 1850 8.65 NC 6577 4139 1861 8.65 NE 6613 4152 1867 8.65 NF 6739 4195 1886 8.65 Top OA 6818 4222 1899 8.65 Base OA 6910 4250 1911 8.65 Top OB 7021 4278 1924 8.65 TD 10463 4261 1916 8.65 2 (! Casingrrubing Program: Milne po~. V1PS-03 Well Permit Hole Csgl WtlFt Grade Conn Length Top Bottom Size Tbg O.D. MD I TVDrkb MD I TVDrkb 42-in 20- in * 92# H-40 Welded 80-ft 30-ft 112-ft / 112-ft 9.875-in 7.625-in 29.7# L-80 BTC 70 16-ft O-ft 7,016-ft / 4,277-ft 6. 125-in 4.5-in 12.7# L-80 BTC 3,672-ft 6,778-ft / 4,208-ft 10,450-ft / 4,201-ft 6. 125-in 4.5-in 12.7# L-80 BTC 3,547-ft 6916-ft /4,227-ft 10,463- ft / 4,261-ft *The 20" casing is insulated Recommended Bit Program: BHA Hole Depth (MD) Bit Type Nozzle/Flow Size rate 1 9.875-in 0 - 2,000-ft Hughes MXC-1 3-15 & 1-10 2 9.875-in 2,000 - 7,016-ft Security Rotary TBD Steerable Bit 3 6.125-in 7,016-ft - TD Security FM2643 3 -12 Well Control: . Production hole will be drilled with a diverter. Surface Interval . Maximum anticipated BHP: . Maximum surface pressure: . Kick tolerance: . Planned completion fluid: 1924 psi @ 4278' TVDrkb - Top of "OB" 1496 psi @ surface (Based on BHP and a full column of gas from TD @ 0.1 psi/ft) Diverter will be function tested. BOP's:Test annular 250 psi low and 2500 psi high, and rams to 250 psi low and 4,000 psi high. N/A 9.2 ppg NaCI / 6.8 ppg Diesel . Planned BOP test pressure: . Drilling Hazards & Contingencies: Hydrates . Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit 3 Milne PO~' '~PS-03 Well Permit ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. . Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation . We do not expect losses while drilling this well. . Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures . It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. Pad Data Sheet . Please Read the S-Pad Data Sheet thoroughly. Breathing . N/A Hydrocarbons . Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults . NA Hydrogen Sulfide . MPS Pad is not designated as an H2S Pad. Anti-collision Issues . MPS-03 has no anti-collision issues. 4 ( DRILL & COMPLETION PROCEDURE Milne po~ ~PS-03 Well Permit Pre- Rig Operations 1. The 20" insulated conductor is installed Procedure 1. MIRU, NU diverter on 20" conductor and function test, PU 4" drill pipe 2. Drill 9-7/8" surface hole as per directional plan. 3. Condition mud prior to 7 5/8" casing run. POOH 4. Run and cement 7 5/8" casing from TD to surface. 5. ND Diverter 6. Install FMC 11" 5m horizontal wellhead 7. N/U and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250 low and 4000 psi high 8. Drill 6-1/8" OB horizontal production hole as per directional plan. 9. Run 4-1/2" slotted liner and hang off 100' inside 7-5/8" casing. 10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD. a. RIH. Orient and set whipstock to place window at top of the OA interval. b. Shear off and mill window thru 7-5/8" casing. 11. Drill 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud properties and POOH. 12. MU whipstock retrieving tool and pull whipstock 13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing 14. POOH 15. Till and displace out drilling mud with 9.2 ppg N aCl 16. POOH 17. Run in hole with 4-1/2" jet pump completion as per schematic 18. Land tubing hanger and test 19. Set BPV 20. ND BOP 21. Install and test tree 22. Pull BPV 23. Drop ball and set production packer 24. Test 7-5/8" x 4-1/2" annulus and packer to 3500 psi 25. Freeze protect thru GLM 26. Install BPV and secure the well 27. RD/MO 5 (" ( BP EXPLORATION Milne Point Unit MPS-03 & MPS-03 L 1 Field: Milne Point Well: MPS-03 DIRECTIONAL OPEN HOLE FORMATION DEPTH LWD LOGGING MD I TVD TOC NONE NONE 112' 112' Top of Lead Cement Surf Surf Dir/GRlRES NONE Base of Permafrost 1,936" 1,816' Top of Tail Cement 5.938 3873 Top of N sand 6,438' 4,086' ENG: Steve Campbell! Matthew Green RIG: Doyon 141 MSL 39.3-ft RKB: 68' HOLE CASING MUD INFO TOC SIZE SPECS PIT INFO INFORMATION Wellhead 20" 91.5# FMC Gen 6 20" x 11- 5M H.40 Insulated N/A 42'. Welded KOP @ 366' MD " '- -.. -..-. ---.-.. -.. -..- ..--. -.. -. --.-- Dir/Res . , ABI/GR NONE OA sand 6,818' 4,222' "" - -.. -..-.. -.. -.. - .. -.. -.. -.. .22:.4~<r.. ~:.221'.. ...... .... 7-5/8" Surface casing 7,016' 4,277' - - Õi~/~; . - . . - . . - . . - .. - . . - . . - . . - . . - . . - --. - ABI/GR NONE OB sand 7,021' 4,278' 10,463' 4,261' - - . . - . . - . . - . . - . . - . . - . - - - . - - -1- - - - . . - . - - . - - . . 7/9/2002 6-1/8" Hole - 4-1/2", 12.6#, L-80 Slotted Liner 9-7/8" Surface Casing 7 5/8" 29.7# L-80 BTC MW = 9.2 6-1/8" Hole - 4-1/2",12.6#, L-80 Slotted Liner MPS-03ML WBD.xls COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM BP Amoco Co-ordinate (NfE) Reference: Wen Centre: Plan MPS-03, True North Vertical (fVD) Reference: Plan MPS-03 66.20 66.20 Section (VS) Reference: User Dermed (89928N,3643. 15E) Measured Depth Reference: Plan MPS-03 66.20 66.20 Cakulation Method: Minimum Curvature Depth Fm Depth To Survey/Plan 6778.00 10450.81 Planned: MPS-03L1 wpOl VI Calculation Method: Minimmn Ctnvature Error SYslem: ISCWSA Scan Method: Trav Cylinder North Error Surface: Elliptical + Casing Warning Method: Rules Based FORMATION TOP DETAILS No. TVDPath MDPath Fonnation 4222,20 6822.36 TSBD-OA 3600- 1 2 3 4 5 6 7 8 9 10 11 r,7 N.OO 70.00 .;1111".35 91.60 ~ 11111.33 91.60 >""J.34 89.90 >' .IIJ.76 89.90 I, ," 1.32 89.90 ""-11.12 90.00 1'"JII.36 91.15 1.'.11 ,.38 91.15 ""J 1,75 90.11 1('J ,",81 90.11 See MD l'lan: MPS-03L I wpO I (Plan MPS-0311'Ian MI'S-03L 1) Tool MWD+IFR+MS Date: 7/9/2002 Cre-dted By: Ken Allen Checked: Date: Reviewed: Date: WELL DETAILS Name +Ni-S I.atitude Longiluôc Slut +Ei-W Northing Easting Plan MPS-03 61.83 -296.6g 6000037.19 566047.81 70'24'37.937N 149'27'43.867W N/A Ine TARGET DET AII.S Name TVD +N/-S +Ei-W Northing ElIs1ing Shape Togepi LI T4 420120 -2755.28 3587.31 5997314.00 569659.00 Puiot T ogepi LI T3 4202.20 -2247.53 3623.80 5997822.00 569691.00 Point Togepi LI TI 420620 -815.42 3745.48 5999255.00 569800.()() Point Togepi LlPoly 4206.20 815.27 3578.88 6000884.00 569619.00 Polygon T ogepi LI 12 420820 -1917.68 3645.72 5998152.00 569710.00 Point MPS-03 FauJt1 426620 -2055.89 3327.46 5998011.00 569393.00 Polygon MPS-03 FauJt2 4266.20 -196.39 3525.93 5999872.00 569575.00 Polygon SECTION DETAILS Azi TVD +N/-S +E/-W DLeg TFaee VSee Tafget 160.00 4208,53 899.28 3643,15 0,00 0.00 2341.50 177.19 4245.09 680.28 3686.26 12.00 39.93 2509.09 177.19 4208.88 -611.64 3749.68 0.00 0.00 3346.33 185.17 4206.20 -815.42 3745.48 4.00 101.98 3467.13 Togepi LI TI ..-..., 185.19 4206.20 -815.83 3745.44 4.00 107.20 3467.35 185.19 4208.17 -1887.98 3648.11 0.00 0.00 4043.23 184.00 4208.20 -1917.68 3645.72 4.00 -84.95 4059.43 Togepi LI T2 183.77 4207.91 -1946.86 3643.74 4.00 -11.17 4075.63 183.77 4202.60 -2211.25 3626.30 0.00 0.00 4222.85 184.11 4202.20 -2247.53 3623.80 3.00 161.97 4242.97 Togepi LI T3 184.11 4201.20 -2755.28 3587.31 0.00 0.00 4523.31 Togepi LI T4 CASING DETAILS No. TVD MD Size Name All TVD depths are ssTVD plus 66.2'for RKBE. # ,# ... , ~ .~ "'''' ..~ ~~ ~~. )/., #~~ -" ~~ :s a:: 0 0 ::!. ;s 0.- Ö .~ 4000- > ë E-< 4201.22 10450.80 4 1/2" 4.500 ~ Total Depth: 10450.81' MD. 4201.2' TVD End Dir : 9941.75' MD, 4202.2' TVD Start Dir 3/1 00' : 9905.38' MD, 4202.6'TVD End Dir : 9640.36' MD. 4207.91' TVD Start Dir4/100' : 9581.32' MD, 4208.17'TVD Start Dir 4/1 00' : 8300.33' MD, 4208.88'TVD :':nd,Dir, : 8?04-76' MD~ 4206.2; TVDg" . ¡. . . ~ 4400 1/2" 2400 3600 2800 COMPANY DETAILS HI' Amoco Calculation Method: Minimmn Curvature Enur System: ISCWSA Scan Method: Trav Cylinder North Enm Surface: El1iptjcal + Casing Wamin~ MethtXl: Rules Based :s ~ 0 Ë +' ::E' 1:: ~ ::E' =: 0 </J 1400- -1400 REFERENCE INFORMATION SURVEY PROGRAM Plan: MPS-03Ll wpOl (Plan MPS-03/1'lan MPS.03Ll) Tool MWD+IFR+MS Depth Fm Depth To SurveylPlan 6778.00 10450.81 Planned: MPS-03LI wpOl VI Reviewed: Date: Co-ordinate (NÆ) Reference: Well Centre: Plan MpS-03, True North Vertical (1VD) Reference: Plan MpS-03 66.20 66.20 Section (VS) Reference: User Defmed (89928N,3643.15E) Measured Depth Reference: Plan Ml'S-03 66.20 66.20 Calculation Method: Minimum CurvatlU'e SIJrt Dir 12/100' : 6778' MD, 4208.53'TVD T.. :--...-. Ehd Dir : 7006.35' MD, 4245.09' TVD ~.l ! I , I ¡ i I I ..r - I I I Dale: 7/9/2002 Created fiy: Ken Allen Checked: Date: Name +NI-S +FJ-W Northing Ea...ting Latitude LoogiluOO Slot Plan MPS-03 61.83 -296.68 6000037.19 566047.81 70024'37.937N 149°2T43.867W N/A TARGET DETAILS Name TVD +N/-S +E/-W Northing Easting Shape Togepi 1.1 T4 420120 -2755.28 3587.31 5997314.00 569659,00 Point T ogepi 1.1 T3 4202.20 -2247.53 3623.80 5997822.(10 569691.00 Point T ogepi 1.1 Tl 4206.20 -815.42 3745.48 5999255.00 569800,00 Point Togepi LIPoly 4206.20 815.27 3578.88 c.oO(l884.0(l 569619,00 Polygon T ogepi 1.1 T2 4208.20 -1917.68 3645.72 5998152.0(1 569710,00 Poinl MPS-03 Faultl 4266.20 -2055.89 3327.46 5998011.00 569393.00 Polygon MPS-03 Fault2 4266.20 -196.39 3525.93 5999872.(1(1 569575,00 Polygon SECTION DETAILS See MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target 1 6778.00 70.00 160.00 4208.53 899.28 3643.15 0.00 0.00 0.00 2 7006.35 91.60 177.19 4245.09 680.28 3686.26 12.00 39.93 218.32 3 8300.33 91.60 177.19 4208.88 -611.64 3749.68 0.00 0.00 1509.11 4 8504.34 89.90 185.17 4206.20 -815.42 3745.48 4.00 10 I. 98 1712.93 Togepi Ll TI .--.~ 5 8504.76 89.90 185.19 4206.20 -815.83 3745.44 4.00 107.20 1713.35 6 9581.32 89.90 185.19 4208.17 -1887.98 3648.11 0.00 0.00 2786.86 7 9611.12 90.00 184.00 4208.20 -1917.68 3645.72 4.00 -84.95 2816.60 Togepi Ll T2 8 9640.36 91.15 183.77 4207.91 -1946.86 3643.74 4.00 -11.17 2845.80 9 9905.38 91.15 183.77 4202.60 -2211.25 3626.30 0.00 0.00 3110.42 10 9941.75 90.1 I 184.11 4202.20 -2247.53 3623.80 3.00 161. 97 3146.74 Togepi L 1 T3 11 10450.8 I 90.11 184.11 4201.20 -2755.28 3587.31 0.00 0.00 3654.99 Togepi L 1 T4 All TVD depths are ssTVD plus 66.2'for RKBE. I ¡ i ¡ I T"L~I Drpth: 10450.81' MD, 4201.2'TVD -2800- -......,.... I 2800 ¡ i I 3500 I 4200 West(-)/East(+) [700ft/in] I 4900 WELL DETAILS CASING DETAILS FORMATION TOP DETAILS No. TVD Name Size No. TVDPath MDPath Formation MD 4201.22 10450.80 4 1/2" 4222.20 6822.36 TSBD-OA 4.500 ....., AÞ / >'», "yÇX..Y;..~......'..' '..../...;{:. '>./.. ' y~ -V",. ,~{f/;;;2':.<,,">' '..~ ,~ /"'" , ., ,>", , " ~ ( BP My Planning Report MAP Company: Field: Site: Well: Wellpath: Field: BPAmOco Milne Point M Pt S Pad Plan MPS-03 Plan MPS-03L 1 Date: 7/8/2002 Time:... <14:29:31 Page: Co-ordinate(NE) Reference: Well: Plan MPS-03, True North Vertical (TVD) Reference: Plan MPS-03 66.20 66.2 Section (VS) Reference: Well (O.00N,0.00E.127.53Azi) Survey Calculation Method: Minimum Curvature Db: 1 Oracle Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska. Zone 4 Well Centre BGGM2002 Site: M pt S Pad Site Position: From: Map Position Uncertainty: Ground Level: Northing: 5999978.00 ft Easting: 566345.00 ft Latitude: Longitude: North Reference: Grid Convergence: 70 24 37.329 N 149 27 35.171 W True 0.51 deg 0.00 ft 0.00 ft Well: Plan MPS-03 Slot Name: +N/-S 61.83 ft Northing: 6000037.19 ft +E/-W -296.68 ft Easting: 566047.81 ft Position Uncertainty: 0.00 ft Latitude: Longitude: 70 24 37.937 N 149 27 43.867 W Well Position: Current Datum: Magnetic Data: Field Strength: Vertical Section: Plan MPS-03 66.20 7/1/2002 57498 nT Depth From (TVD) ft 0.00 Height 66.20 ft Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Plan MPS-03 6788.00 ft Mean Sea Level 25.83 deg 80.80 deg Direction deg 127.53 Wellpath: Plan MPS-03L 1 +N/-S ft 0.00 Plan: MPS-03L 1 wp01 Date Composed: Version: Tied-to: 7/1/2002 1 From: Definitive Path Principal: Yes Casing Points MD TVD Diameter Hole Size Name ft ft in in 10450.80 4201.22 4.500 6.125 41/2" Formations MD TVD Formations Lithology Dip Angle Dip Direction ft ft deg deg 0.00 BPRF 0.00 0.00 0.00 TUgnu 0.00 0.00 0.00 SBF2-NA 0.00 0.00 0.00 SBF1-NB 0.00 0.00 0.00 SBE4-NC 0.00 0.00 0.00 SBE2-NE 0.00 0.00 0.00 SBE1-NF 0.00 0.00 6822.36 4222.20 TSBD-OA 0.00 0.00 0.00 TSBC 0.00 0.00 0.00 TSBB-OB 0.00 0.00 Targets Map Map <--- Latitude ---> <-- Longitude --> Name Description TVD +N/-S +E/-W Northing Easting Deg Min See Deg Min See Dip. Dir. ft ft ft ft ft Togepi L 1 T4 4201.20 -2755.28 3587.31 5997314.00 569659.00 70 24 10.831 N 149 25 58.758 W Togepi L 1 T3 4202.20 -2247.53 3623.80 5997822.00 569691.00 70 24 15.824 N 149 25 57.682 W Togepi L 1 T1 4206.20 -815.42 3745.48 5999255.00 569800.00 70 24 29.908 N 149 25 54.096 W Togepi L 1 T2 4208.20 -1917.68 3645.72 5998152.00 569710.00 70 24 19.068 N 149 25 57.035 W BP My Planning Report MAP ( Company: BP Amoco Field: Milne Point Site: M Pt SHad Well: Plan MPS-03 Wellpath: PlanMPS-03L1 Date:7!8/2002 Time: 14:29:31 Page: Co-ordinate(NE)Reference: Well: Plan MPS-03, True North Vertical (TVD) Reference: Plan MPS-03 66.20 66.2 Section (VS) Reference: Well (O.00N,0.00E,127.53Azi) Survey Calculatioll Method: Minimum Curvature Db: Oracle 2 Targets Name Description Dip. Dir. TVD ft +N/-S ft +E/-W ft Map Northing ft Map Easting ft <==Latitude~ <---LolÏgi~de--> Deg Min Sec Deg Min See MPS-03 Fault1 4266.20 -2055.89 3327.46 5998011.00 569393.00 70 24 17.710 N 149 26 6.363 W -Polygon 1 4266.20 -2055.89 3327.46 5998011.00 569393.00 70 24 17.710 N 149 26 6.363 W -Polygon 2 4266.20 -2171.72 4211.55 5997903.00 570278.00 70 24 16.567 N 149 25 40.459 W MPS-03 Fault2 4266.20 -196.39 3525.93 5999872.00 569575.00 70 24 35.997 N 149 26 0.522 W -Polygon 1 4266.20 -196.39 3525.93 5999872.00 569575.00 70 24 35.997 N 149 26 0.522 W -Polygon 2 4266.20 1591.37 3466.73 6001659.00 569500.00 70 24 53.580 N 149 26 2.232 W Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/10OO deg 6778.00 70.00 160.00 4208.53 899.28 3643.15 0.00 0.00 0.00 0.00 7006.35 91.60 177.19 4245.09 680.28 3686.26 12.00 9.46 7.53 39.93 8300.33 91.60 177.19 4208.88 -611.64 3749.68 0.00 0.00 0.00 0.00 8504.34 89.90 185.17 4206.20 -815.42 3745.48 4.00 -0.83 3.91 101.98 Togepi L1 T1 8504.76 89.90 185.19 4206.20 -815.83 3745.44 4.00 -1.18 3.82 107.20 9581.32 89.90 185.19 4208.17 -1887.98 3648.11 0.00 0.00 0.00 0.00 9611.12 90.00 184.00 4208.20 -1917.68 3645.72 4.00 0.35 -3.98 -84.95 Togepi L 1 T2 9640.36 91.15 183.77 4207.91 -1946.86 3643.74 4.00 3.92 -0.78 -11.17 9905.38 91.15 183.77 4202.60 -2211.25 3626.30 0.00 0.00 0.00 0.00 9941.75 90.11 184.11 4202.20 -2247.53 3623.80 3.00 -2.85 0.93 161.97 Togepi L 1 T3 10450.81 90.11 184.11 4201.20 -2755.28 3587.31 0.00 0.00 0.00 0.00 Togepi L 1 T4 Survey MD Incl Azim TVD Sys TVD l\'lapN MapE VS DLS T oollCom ment ft deg deg ft ft ft ft ft deg/1 000 6778.00 70.00 160.00 4208.53 4142.33 6000968.56 569682.52 2341.50 0.00 Start Dir 12/100' : 6778' MD, 6800.00 72.03 161.78 4215.69 4149.49 6000948.97 569689.50 2358.87 12.00 MWD+IFR+MS 6822.36 74.12 163.55 4222.20 4156.00 6000928.61 569696.05 2376.36 12.00 TSBD-OA 6825.00 74.36 163.76 4222.92 4156.72 6000926.18 569696.79 2378.41 12.00 MWD+IFR+MS 6850.00 76.71 165.69 4229.16 4162.96 6000902.89 569703.37 2397.69 12.00 MWD+IFR+MS 6875.00 79.07 167.58 4234.41 4168.21 6000879.17 569709.23 2416.66 12.00 MWD+IFR+MS 6900.00 81.44 169.44 4238.64 4172.44 6000855.07 569714.34 2435.25 12.00 MWD+IFR+MS 6925.00 83.82 171.28 4241.84 4175.64 6000830.67 569718.71 2453.43 12.00 MWD+IFR+MS 6950.00 86.21 173.11 4244.01 4177.81 6000806.03 569722.31 2471.14 12.00 MWD+IFR+MS 6975.00 88.60 174.92 4245.14 4178.94 6000781.22 569725.13 2488.34 12.00 MWD+IFR+MS 7000.00 91.00 176.73 4245.23 4179.03 6000756.31 569727.17 2504.96 12.00 MWD+IFR+MS 7006.35 91.60 177.19 4245.09 4178.89 6000749.97 569727.56 2509.09 12.00 End Dir : 7006.35' MD, 4245.0 7100.00 91.60 177.19 4242.47 4176.27 6000656.53 569732.98 2569.69 0.00 MWD+IFR+MS 7200.00 91.60 177.19 4239.67 4173.47 6000556.74 569738.76 2634.39 0.00 MWD+IFR+MS 7300.00 91.60 177.19 4236.87 4170.67 6000456.96 569744.55 2699.09 0.00 MWD+IFR+MS 7400.00 91.60 177.19 4234.07 4167.87 6000357.17 569750.33 2763.80 0.00 MWD+IFR+MS 7500.00 91.60 177.19 4231.28 4165.08 6000257.39 569756.11 2828.50 0.00 MWD+IFR+MS 7600.00 91.60 177.19 4228.48 4162.28 6000157.61 569761.90 2893.20 0.00 MWD+IFR+MS 7700.00 91.60 177.19 4225.68 4159.48 6000057.82 569767.68 2957.90 0.00 MWD+IFR+MS 7800.00 91.60 177.19 4222.88 4156.68 5999958.04 569773.46 3022.61 0.00 MWD+IFR+MS 7900.00 91.60 177.19 4220.08 4153.88 5999858.25 569779.25 3087.31 0.00 MWD+IFR+MS 8000.00 91.60 177.19 4217.28 4151.08 5999758.47 569785.03 3152.01 0.00 MWD+IFR+MS 8100.00 91.60 177.19 4214.49 4148.29 5999658.69 569790.81 3216.71 0.00 MWD+IFR+MS 8200.00 91.60 177.19 4211.69 4145.49 5999558.90 569796.60 3281.42 0.00 MWD+IFR+MS 8300.33 91.60 177.19 4208.88 4142.68 5999458.79 569802.40 3346.33 0.00 Start Dir 4/100' : 8300.33' MD 8400.00 90.77 181.09 4206.81 4140.61 5999359.20 569804.78 3408.20 4.00 MWD+IFR+MS 8504.34 89.90 185.17 4206.20 4140.00 5999255.00 569800.00 3467.13 4.00 Togepi L 1 T1 8504.76 89.90 185.19 4206.20 4140.00 5999254.58 569799.97 3467.35 4.00 End Dir : 8504.76' MD, 4206.2 Company: BP Amoco Field: Milne Point Site: M Pt S Pad Well: Plan MPS-03 Wellpath: Plan MPS-03L 1 Survey MD InclAzim ft deg deg 8600.00 89.90 185.19 8700.00 89.90 185.19 8800.00 89.90 185.19 8900.00 89.90 185.19 9000.00 89.90 185.19 9100.00 89.90 185.19 9200.00 89.90 185.19 9300.00 89.90 185.19 9400.00 89.90 185.19 9500.00 89.90 185.19 9581.32 89.90 185.19 9600.00 89.96 184.44 9611.12 90.00 184.00 9640.36 91.15 183.77 9700.00 91.15 183.77 9800.00 91.15 183.77 9905.38 91.15 183.77 9941.75 90.11 184.11 10000.00 90.11 184.11 10100.00 90.11 184.11 10200.00 90.11 184.11 10300.00 90.11 184.11 10400.00 90.11 184.11 10450.81 90.11 184.11 BP My Planning Report MAP ( Date: .7/8/2002 Time: 14:29:31 Page: Co-ordinate(NE1R~ference: Well:Plan MPS-03, True North VerticarcrYD) Reference; Plan MPS:.o3662066.2 Sedion (VS) Refertmce: Well (0.00N,O.00E,127.53Azi) SurveyCalctdationMethod: Minimum Curvature Db: Oracle 3 TVD Sys TVD MapN MapE Tool/Comment ft ft ft ft ft deg/10Oft 4206.38 4140.18 5999159.67 569792.19 3518.30 0.00 MWD+IFR+MS 4206.56 4140.36 5999060.01 569784.04 3571.79 0.00 MWD+IFR+MS 4206.74 4140.54 5998960.36 569775.88 3625.28 0.00 MWD+IFR+MS 4206.92 4140.72 5998860.70 569767.72 3678.78 0.00 MWD+IFR+MS 4207.11 4140.91 5998761.04 569759.56 3732.27 0.00 MWD+IFR+MS 4207.29 4141.09 5998661.39 569751.40 3785.76 0.00 MWD+IFR+MS 4207.47 4141.27 5998561.73 569743.24 3839.26 0.00 MWD+IFR+MS 4207.66 4141.46 5998462.07 569735.08 3892.75 0.00 MWD+IFR+MS 4207.84 4141.64 5998362.42 569726.92 3946.24 0.00 MWD+IFR+MS 4208.02 4141.82 5998262.76 569718.76 3999.73 0.00 MWD+IFR+MS 4208.17 4141.97 5998181.72 569712.12 4043.23 0.00 Start Dir 4/100' : 9581.32' MD 4208.20 4142.00 5998163.09 569710.72 4053.33 4.00 MWD+IFR+MS 4208.20 4142.00 5998152.00 569710.00 4059.43 4.00 Togepi L 1 T2 4207.91 4141.71 5998122.81 569708.28 4075.63 4.00 End Dir : 9640.36' MD, 4207.9 4206.71 4140.51 5998063.29 569704.88 4108.76 0.00 MWD+IFR+MS 4204.71 4138.51 5997963.48 569699.18 4164.31 0.00 MWD+IFR+MS 4202.60 4136.40 5997858.30 569693.18 4222.85 0.00 Start Dir 3/100' : 9905.38' MD 4202.20 4136.00 5997822.00 569691.00 4242.97 3.00 Togepi L 1 T3 4202.09 4135.89 5997763.87 569687.34 4275.05 0.00 MWD+IFR+MS 4201.90 4135.70 5997664.08 569681.05 4330.12 0.00 MWD+IFR+MS 4201.70 4135.50 5997564.29 569674.77 4385.19 0.00 MWD+IFR+MS 4201.51 4135.31 5997464.50 569668.48 4440.26 0.00 MWD+IFR+MS 4201.32 4135.12 5997364.70 569662.19 4495.33 0.00 MWD+IFR+MS 4201.20 4135.00 5997314.00 569659.00 4523.31 0.00 Togepi L 1 T4 TREE: Cameron 4-1/16" 5M PHüPü~I::.LJ c.;üMPLl::.llüN WELLHEAD: FMC Gen 6 11",5M 1\1'".... ~s-n3 0- 1\11 D.'........."...' ~ _03 IL,"~ Tubing Head: 11" x 4-1/2", ., ~~ --,: ~ FMC Tubing Hanger íXXXp ~~ 20" 92 Ibltt, H-40 Welded ... / E III ~ 42" Hole Insulated /... 4-1/2" X 1" Gas Lift Mandrel @ 2,000' MD , 2000' TVD, Diesel Freeze protect to ...... ..... RP shear valve open position 750' MD KB. ELEV =67.5' Cellar Box ELEV = 39.3' 1121 Jet Pump Installed in Sliding Sleeve Post rig! 4-11211,12.6 Ib/ft, L-80, IBT-M Coupling 00: 5.211 Orift/IO: 3.833" Burst: 8,430, 80% 6,744 psi Collapse: 7,500, 80%=6,000 psi 9.2 KCI with corrosion inhibitor as packer fluid ~ '" . BIW 1- Wire Phoenix Pressure Gauge (3.850" 10, W/BIW 1- wire down to lower sensor) Halliburtion Dura Sleeve XD WIX Nipple (3.813" 10) Phoenix Pressure Gauge (2.840" 10) ~ 7-5/8" x 4-1/2" S-3 Packer I Set @ 6,678' MD, 4208' TVD I 7-5/811 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing 10: 6.875 Coupling 00: 8.5" Burst: 6,890 psi Collapse: 4,790 psi ~ 3-1/2" HES 'XN' nipple 2.750" 10 No Go W/RHC ball & rod Wireline Entry Guide Window in 7" casing @ 6,7781 MD Well Inclination @ Window = 70 Degrees \~ Multi-Lateral Junction 6,7781 6-1/8" OA Lateral TO 10,450' 6-1/8" OB Lateral TO 10,463' ...... ---. - - - - - -- OA Horizontal 6-1/8" hole r-- -- - - - - - - -- 4-1/2" Slotted Liner W/Hookwall hanger 7" Casing Shoe @ 7,016' MD Well Inclination @ Shoe = 76 Degrees ~ ~ ~..<:::, .~~ 9-7/S"Hole " \ ~ - ------- , '-- OB Horizontal 6-1/8" hole --------- PBTD TD 4-1/2" Slotted Liner & Hanger DATE 27 Jun 02 REV. BY SKC COMMENTS Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion Milne Point Unit WF : MPS-03 API NO: CHECK 1 ST ANDARD LETTER DEVELOPMENT x DEVELOPMENT REDRILL EXPLORATION INJECTION WELL INJECTION WELL REDRILL Rev: 6/18/02 C\jody\templates ( ( TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSNUTTAL LETTER WELL NAMElll'ú #fi( ~O,3 ¿ / CHECK WHAT APPLIES ADD-ONS (OPTIONS) "CLUE" MUL TI LATERAL The permit is fOJ a new wellbore segment of existing well ,¡J1,11'4 )l'?J'b' -~ Permit N1J:>~/YXAPI No. .10 "'ð.G, ~ - 2Jlð$ (If API number last two (2) Production should continue to be reported as a function of digits are between 60-69) the original API number stated above. x PILOT HOLE (PH) In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be .clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). ANNULAR DISPOSAL Please note that an disposal of fluids generated. . . INTO ANNULUS OF ANOTHER WELL ON SAME PAD L-) SPACING EXCEPTION Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. DRY DITCH SAMPLE All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. /4/¿'¡ WELL PERMIT CHECKLIST COMPANY ß/À' WELL NAME ;o//S - ð )LJ PROGRAM: Exp- Dev ~ Redrll- Se~ - Wellbore segX Ann. disposal para req- FIELD & POOL ,52...oS / tf 6 INIT CLASS f)",-(.,/ /.- ~ ,1 GEOL AREA ?"7Ö UNIT# 113 ¿ c¡ ON/OFF SHORE C>A) .ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . P N~ 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N 3. Unique well name and number. .. . . . . . . . . . . . . . . . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. . . . Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N 9. Operator only affected party... . . . . .. . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N :AW! ~~T~ '" 12. Permit ca. ~ be issued without adminis. trativ~ approval.. . . . . ~N I)' r - ~ / / Ó..L- 13. Can permit be approved before 15-day walt.. . . . . . . . . . Y N ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . 'N 15. Surface casing protects aU known USOWs. . . . . . . . . . . Y N 16. CMT vol adequate to circulate on conductor & surf csg. . . . . -¥--N- 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y N ~ / J A - ('-- /'1-1 18. CMT will cover all known productive horizons. . . . . . . . . . ~ ß.I f 'i ) t"V If<. 19. Casing designs adequate for C, T,. B & permafrost. . . . . . . œ:. N 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . i2 N 21. If a re-drill, has a 10-403 for abandonment been approved. . . .~ A.t IA- 22. Adequate well bore separation proposed.. . . . . . . . . .-. . CIl N 23. If diverter required, does it meet regulations. . . . . . . . . . --¥-tt"" AI lit- 24. Drilling fluid program schematic & equip list adequate. . . . . 4? N 25. BOPEs, do they meet regulation. . . . '.' . . . . . . . . . . Œ-. N . r ð j rJ/:' / - Jl'Jr /' ., 26. BOPE press rating appropriate; test to C/O 00 psig. ~ N ;1t ':> r (, ..., '7 W r;)' t- 27. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . . N 28. Work will occur without operation shutdown. . . . . . . . . . . . ;' ~. 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y ~ 30. Permit can be issued wlo hydrogen sulfide measures. .. . . N1J 31. Data presented on potential overpressure zones. . . . . . . ~N -- ¡/ ) .LJ 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y /l./ ' I 7. AP-PR - o/'T.9' 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . N . ~ ?~ ðZ, 34. Contact namelphone for weekly progress reports [exploratory 0 . Y N ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; . . . . . . . (B) will not contaminate freshwater; or cause drilling waste. .. to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from a poo.; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular: C MMISSION: RP# JDH-~ #C1 COT. WGA'\.¡.fAk DTS (1) j (, J ö 1\P.~'l- Dj\ JE iJ.iUlT T{ "t 0 L. GEOLOGY APPR DATE ~ ~~2- ~ ¡;'/M,j ';:., r,"c".'rJ ($"A" /'7 f') -,1ft ;...bf G:\geology\permits\checklist. doc Commentsllnstructions: Well History File APPENDIX Infonnation of detailed nature that is not particularly germane to the Well Permitting Process' but is part of the history file. To improve the readability of the Well History file and to simplrty finding information, information of this nature is accumulated at the end of the file under APPEN.DIX. No special effort has been made to chronologically organize this category of information. ( Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Nov 27 10:00:13 2002 Reel Header Service name............ .LISTPE Da te. . . . . . . . . . . . . . . . . . . . . 02/11/27 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name... ........ .... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments. ...... ..... .... .STS LIS d Dd-I'-I7 //33; Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 02/11/27 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name.... ...UNKNOWN Comments. . . . . . . . . . . . . . . . .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 1 AK-MW-22127 B. HENNINGSE E. VAUGHN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 6 AK-MW-22127 B. HENNINGSE C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MPS-03 L1 500292310560 BP Exploration (Alaska) Inc. Sperry-Sun Drilling Services 27-NOV-02 MWDRUN 2 AK-MW-22127 B. HENNINGSE E. VAUGHN MWDRUN 7 AK-MW-22127 B. HENNINGSE C. DIXON 7 12N 11E 3368 4744 .00 66.20 38.70 MWDRUN 5 AK-MW-22127 B. HENNINGSE C. DIXON # WELL CASING RECORD 1ST STRING 2ND STRING 3 RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 20.000 110.0 6.125 7.625 6943.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1, 2, 6, AND 7 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 6 AMD 7 ALSO INCLUDED AT-BIT INCLINATION (ABI). MWD RUN 5 WAS DIRECTIONAL ONLY TO POSITION A WHIPSTOCK AT 6943'MD/4170'TVD - ONLY ROP DATA ARE PRESENTED. 4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 8/29/02. MWD DATA ARE CONSIDERED PDC. 5. MWD RUNS 1, 2, 5, 6, AND 7 REPRESENT WELL MPS-03 Ll WITH API#: 50-029-23105-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10260'MD/ 4193'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name...... ..... ..STSLIB.OOl Service Sub Level Name... Version Number.... ...... .1.0.0 Date of Generation...... .02/11/27 Maximum Physical Record. .65535 File Type.. ....... ...... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD 1 ( Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX ROP $ clipped curves; all bit runs merged. .5000 START DEPTH 73.5 90.5 90.5 90.5 90.5 90.5 110.5 STOP DEPTH 10207.0 10214.0 10214.0 10214.0 10214.0 10214.0 10261.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 73.5 3527.0 MWD 2 3527.0 6943.0 MWD 5 6943.5 6966.5 MWD 6 6966.5 7507.0 MWD 7 7507.0 10261.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type........ ....... ...0 Data Specification Block Type.....O Logging Direction..... ........... . Down Optical log depth units. ........ ..Feet Data Reference Point............. . Undefined Frame Spacing.... ..... ........... .60 .1IN Max frames per record.. ........ ...Undefined Absent value............... ...... .-999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 73.5 10261 5167.25 20376 73.5 10261 ROP MWD FT/H 0.23 3867.61 331.027 20302 110.5 10261 GR MWD API 8.22 131.2 70.2501 20268 73.5 10207 RPX MWD OHMM 0.14 2000 30.8034 20248 90.5 10214 RPS MWD OHMM 0.08 2000 41.3768 20248 90.5 10214 RPM MWD OHMM 0.06 2000 51.3643 20248 90.5 10214 RPD MWD OHMM 0.05 2000 91.8049 20248 90.5 10214 FET MWD HOUR 0.0467 169.21 0.486095 20248 First Reading For Entire File..... .... .73.5 Last Reading For Entire File.... ...... .10261 File Trailer Service name............ .STSLIB.OOl Service Sub Level Name... Version Number..... .... ..1.0.0 Date of Generation.. .... .02/11/27 Maximum Physical Record. .65535 File Type.............. ..LO Next File Name..... ..... .STSLIB.002 Physical EOF File Header Service name.. ..... .... ..STSLIB.002 Service Sub Level Name... Version Number....... ... .1.0.0 Date of Generation... ... .02/11/27 Maximum Physical Record..65535 File Type............... .LO Previous File Name... ....STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPS RPX RPM RPD FET ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 73.5 90.5 90.5 90.5 90.5 90.5 110.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY STOP DEPTH 3490.0 3482.0 3482.0 3482.0 3482.0 3482.0 3527.0 29-JUL-02 Insite 66.37 Memory 3527.0 110.0 3527.0 .4 71.6 TOOL NUMBER 164580 90.5 10214 EWR4 $ ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.. .............. ..0 Data Specification Block Type.....O Logging Direction...... .......... . Down Optical log depth units.... ...... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record.. .... ... ... . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . - 9 9 9 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 121079 9.875 110.0 Spud Mud 9.00 165.0 7.0 400 10.0 5.800 5.080 4.500 3.500 65.0 75.2 64.0 65.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWD010 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 FET MWD010 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 73.5 3527 1800.25 6908 73.5 3527 ROP MWD010 FT/H 17.09 3867.61 394.976 6834 110.5 3527 GR MWD010 API 14.33 125.1 65.0851 6834 73.5 3490 RPX MWD010 OHMM 0.14 1667.6 44.0179 6784 90.5 3482 RPS MWD010 OHMM 0.08 2000 65.019 6784 90.5 3482 RPM MWD010 OHMM 0.06 2000 91.4987 6784 90.5 3482 RPD MWD010 OHMM 0.05 2000 203.697 6784 90.5 3482 FET MWD010 HOUR 0.0467 1.5087 0.272658 6784 90.5 3482 ( First Reading For Entire File...... ... .73.5 Last Reading For Entire File......... ..3527 File Trailer Service name... ..... .... .STSLIB.002 Service Sub Level Name... Version Number.... .... ...1.0.0 Date of Generation..... ..02/11/27 Maximum Physical Record..65535 File Type. . . . . . . . . . . . . . . .LO Next File Name......... ..STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number....... ....1.0.0 Date of Generation..... ..02/11/27 Maximum Physical Record..65535 File Type. . . . . . . . . . . . . . . .LO Previous File Name... ... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPX FET RPD RPM RPS GR ROP $ 3 header data for each bit run in separate files. 2 .5000 START DEPTH 3482.5 3482.5 3482.5 3482.5 3482.5 3490.5 3527.5 STOP DEPTH 6943.0 6943.0 6943.0 6943.0 6943.0 6943.0 6943.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 31-JUL-02 Insite 66.37 Memory 6943.0 3527.0 6943.0 53.8 84.8 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 TOOL NUMBER 164580 121079 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.......... .... ....0 Data Specification Block Type.. ...0 Logging Direction... ..... ... ..... . Down Optical log depth units... ....... .Feet Data Reference Point........ .... ..Undefined Frame Spacing...... .... ...... ... ..60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 9.875 110.0 Spud Mud 9.20 124.0 7.0 400 8.4 8.200 5.190 6.000 4.600 65.0 106.7 65.0 65.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3482.5 6943 5212.75 6922 3482.5 6943 ROP MWD020 FT/H 2.91 1497.42 377.771 6832 3527.5 6943 GR MWD020 API 8.22 129.18 67.1063 6906 3490.5 6943 RPX MWD020 OHMM 3.4 215.57 16.8208 6922 3482.5 6943 RPS MWD020 OHMM 2.97 467.87 18.6297 6922 3482.5 6943 RPM MWD020 OHMM 2.1 584.16 19.5151 6922 3482.5 6943 RPD MWD020 OHMM 2.28 1901.8 26.9157 6922 3482.5 6943 FET MWD020 HOUR 0.0489 8.1506 0.526642 6922 3482.5 6943 First Reading For Entire File...... ... .3482.5 Last Reading For Entire File.......... .6943 File Trailer Service name.... ..... ....STSLIB.003 Service Sub Level Name... Version Number........ ...1.0.0 Date of Generation..... ..02/11/27 Maximum Physical Record..65535 File Type............ ....LO Next File Name.... ...... .STSLIB.004 Physical EOF File Header Service name...... ...... .STSLIB.004 Service Sub Level Name... Version Number.. ... ..... .1.0.0 Date of Generation.. .... .02/11/27 Maximum Physical Record. .65535 File Type........... .....LO Previous File Name... ... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE START DEPTH ROP 6943.5 $ 4 header data for each bit run in separate files. 5 .5000 STOP DEPTH 6966.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 07-AUG-02 Insite 66.37 Memory 6967.0 6943.0 6967.0 .0 .0 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 TOOL NUMBER 151107 156401 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 6943.0 # BOREHOLE CONDITIONS ( MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.... ...... ........0 Data Specification Block Type.....O Logging Direction... ........ .... ..Down Optical log depth units......... ..Feet Data Reference Point. ............ . Undefined Frame Spacing..... ............... .60 .1IN Max frames per record..... ........Undefined Absent value........ ...... ....... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Flo-pro 9.10 60.0 8.5 30000 5.0 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 Name Service Unit DEPT FT ROP MWD050 FT/H Min 6943.5 0.23 Max 6966.5 26.4 First Reading For Entire File......... .6943.5 Last Reading For Entire File.......... .6966.5 File Trailer Service name........ .... .STSLIB.004 Service Sub Level Name... Version Number..... ......1.0.0 Date of Generation. .... ..02/11/27 Maximum Physical Record..65535 File Type........... .... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Mean Nsam 6955 47 12.2838 47 .0 .0 .0 .0 First Reading 6943.5 6943.5 Last Reading 6966.5 6966.5 Service name...... .... ...STSLIB.005 Service Sub Level Name... Version Number..... ..... .1.0.0 Date of Generation...... .02/11/27 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.004 Conunent Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET GR RPX RPS RPD RPM ROP $ 5 header data for each bit run in separate files. 6 .5000 START DEPTH 6943.5 6943.5 6943.5 6943.5 6943.5 6943.5 6967.0 STOP DEPTH 7461.0 7453.5 7461.0 7461.0 7461.0 7461.0 7507.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL 07-AUG-02 Insite 66.37 Memory 7507.0 6967.0 7507.0 73.9 92.7 TOOL NUMBER 151107 156401 6.125 6943.0 Flo-pro 9.00 65.0 9.5 27000 5.2 .140 .130 .170 .160 70.0 76.6 70.0 70.0 ( MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type... ..0 Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point. ..... ..... ...Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value................ ..... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD060 FT/H 4 1 68 4 2 GR MWD060 API 4 1 68 8 3 RPX MWD060 OHMM 4 1 68 12 4 RPS MWD060 OHMM 4 1 68 16 5 RPM MWD060 OHMM 4 1 68 20 6 RPD MWD060 OHMM 4 1 68 24 7 FET MWD060 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6943.5 7507 7225.25 1128 6943.5 7507 ROP MWD060 FT/H 2.78 639.07 248.209 1081 6967 7507 GR MWD060 API 46.32 108.07 78.3553 1021 6943.5 7453.5 RPX MWD060 OHMM 0.23 1886.77 37.1401 1036 6943.5 7461 RPS MWD060 OHMM 0.33 1886.37 45.4417 1036 6943.5 7461 RPM MWD060 OHMM 0.3 2000 60.9261 1036 6943.5 7461 RPD MWD060 OHMM 8.76 2000 57.4935 1036 6943.5 7461 FET MWD060 HOUR 0.1047 169.21 1.26645 1036 6943.5 7461 First Reading For Entire File......... .6943.5 Last Reading For Entire File... ....... .7507 File Trailer Service name........... ..STSLIB.005 Service Sub Level Name... Version Number.... ...... .1.0.0 Date of Generation...... .02/11/27 Maximum Physical Record..65535 File Type.. ...... ... .... .LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name..... ....... .STSLIB.006 Service Sub Level Name... Version Number.... ...... .1.0.0 Date of Generation. .... ..02/11/27 Maximum Physical Record..65535 File Type.... .......... ..LO Previous File Name. .... ..STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 6 header data for each bit run in separate files. 7 .5000 START DEPTH 7454.0 7461.5 7461.5 7461.5 7461.5 7461.5 7507.5 STOP DEPTH 10207.0 10214.0 10214.0 10214.0 10214.0 10214.0 10261.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: 08-AUG-02 Insite 66.37 Memory 10260.0 7507.0 10260.0 81.4 94.5 TOOL NUMBER 151107 156401 6.125 6943.0 Flo-pro 9.20 54.0 9.5 33000 5.0 .160 .130 .120 .160 65.0 81.2 65.0 65.0 MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.......... ...... ..0 Data Specification Block Type.....O Logging Direction........ ........ . Down Optical log depth units...... .." .Feet Data Reference Point.... ......... . Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . - 999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 RPX MWD070 OHMM 4 1 68 12 4 RPS MWD070 OHMM 4 1 68 16 5 RPM MWD070 OHMM 4 1 68 20 6 RPD MWD070 OHMM 4 1 68 24 7 FET MWD070 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7454 10261 8857.5 5615 7454 10261 ROP MWD070 FT/H 2.45 863.84 212.677 5508 7507.5 10261 GR MWD070 API 49.59 131.2 79.0995 5507 7454 10207 RPX MWD070 OHMM 7 2000 30.908 5506 7461.5 10214 RPS MWD070 OHMM 8.06 2000 40.079 5506 7461.5 10214 RPM MWD070 OHMM 8.79 2000 40.1551 5506 7461.5 10214 RPD MWD070 OHMM 10.2 1664.59 41.9743 5506 7461.5 10214 FET MWD070 HOUR 0.1275 8.8923 0.551269 5506 7461.5 10214 First Reading For Entire File......... .7454 Last Reading For Entire File.......... .10261 File Trailer Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/11/27 Maximum Physical Record..65535 File Type.... ........... .LO Next File Name.... ...... .STSLIB.007 Physical EOF Tape Trailer Service name. ..... .... ...LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 111/27 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name. .............. .UNKNOWN Continuation Number..... .01 Next Tape Name.......... .UNKNOWN Comments.... .... ........ .STS LIS Writing Reel Trailer Service name....... '.'" .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 02/11/27 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name...... ...... ... .UNKNOWN Continuation Number..... .01 Next Reel Name. ......... .UNKNOWN Comments.... ... ......... .STS LIS Library. Scientific Technical Services Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File