Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-146 ( Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. dJc;:;¿ - 14:-0 Well History File Identifier Organizing (done) 0 Two-sided 1111111111111111111 0 Rescan Needed IIIIIIIII~IIIIIIII RESCAN DIGITAL DATA ~iskettes, No.:J- 0 Other, No/Type: OVERSIZED (Scannable) 0 Maps: 0 Color Items: 0 Greyscale Items: 0 Other Items Scannable by a Large Scanner 0 Poor Quality Originals: OVERSIZED (Non-Scannable) 0 Other: 0 Logs of various kinds: NOTES: Scanning Preparation BY: Hele~ ;), x 30 =b6 0 Other:: . Date: /~ I ~t I~ l#P I" IIIIIIIIIIII~ III1I Date:/D I Ô ~ Isl VW 1) , . +3 = TOTAL PAGES fø3 (Count does ~ot 'nelude cover sh'1eJ¡ A,n Date: t [) I /J if 151 V YJ' r '. 1111111111111111111 BY: HelenÇM~ Project Proofing BY: Helen ~ Production Scanning Stage 1 Page Count from Scanned File: (P Lf- (Count does inClude7er sheet) Page Count Matches Number in Scanning Preparation: V YE~ Hele~ Date: t tJ I '0 if If NO in stage 1, page(s) discrepancies were found: YES NO BY: NO Isl mP Stage 1 BY: Helen Maria Date: 151 Scanning is complete at this point unless rescanning is required. ReScanned BY: Helen Maria Date: 151 Comments about this file: Quality Checked 1111111111111111111 8/24/2004 Well History File Cover Page.doc • bp BP Exploration (Alaska) Inc. 0 Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 SAM FEB . 4 2014. December 30, 2011 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission )_ XJ 333 West 7 Avenue c 0 a.- ._ j / T 6 Anchorage, Alaska 99501 03 Subject: Corrosion Inhibitor Treatments of MPS -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, (i ) Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPS -Pad 10/11/2011 Corrosion • Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 --r- 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011 MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 MPS -15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS -16 2030650 50029231510000 1.2 NA 12 NA 10.2 7/29/2011 MPS -17 2021730 50029231150000 Open Flutes - Treated MPS -18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -21 2020090 50029230650000 1 8 NA 1.R NA 29.1 11/3/2009 MPS -22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011 MPS-23 2021320 50029230980000 Open Flutes - Treated MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 102 7/28/2011 MPS -25 2021030 50029230890000 Open Flutes - Treated MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS-27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS-28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011 MPS-29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS -32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011 MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS-37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011 MPS-41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS -43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011 MPSB-04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011 . . - .. MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _ Inserts\Microfilm _ MaIker.doc Permit to Drill 2021460 MD 10270 V" REQUIRED INFORMATION } I M-.ÂL4 'f DATA SUBMITTAL COMPLIANCE REPORT 9/7/2004 Well Name/No. MILNE PT UNIT SB S-03 Operator BP EXPLORATION (ALASKA) INC TVD 4248 ~ Completion Date 8/11/2002 /' Completion Status 1-01L Current Status 1-01L )(J~ )~JtA~ ~gt API No. 50-029-23105-00-00 UIC N ~--~->-------~~--- -~~._._~----~~--._------- Mud Log No Samples No Directional Survey Yes -~---------------- DATA INFORMATION Types Electric or Other Logs Run: MWD, LWD, GR, RES, ABI/IFR /CASANDRA Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Rpt ~ ~D Rpt ~~ ~ D rED C Pdf ;¿ c/\ ED C Pdf (50 C Pdf -~------------- (data taken from Logs Portion of Master Well Data Maint) ~'. Log Log Run Scale Media No 1 Interval Start Stop 0 1 0270 0 1 0270 OH/ CH Received Open 8/27/2002 Open 8/27/2002 Name Directional Survey ..../' C-Ðírectional Survey ~2 LIS Verification Name 73 10216 Case 12/3/2002 11955 11955 ~955 Directional Survey LIS Verification m~" Gtfectional Survey Rate of Penetration 0 10270 Open 8/27/2002 73 10216 Case 12/3/2002 0 10270 Open 8/27/2002 1,2,3 110 10270 Open 6/2/2003 1,2,3 110 10270 Open 6/2/2003 1,2,3 110 4248 Open 6/2/2003 Sample Set Sent Received Number Comments Induction/Resistivity Induction/Resistivity Well Cores/Samples Information: Interval Start Stop Comments -~-- MWD A Directional Survey Log is required to be submitted. This record automatically created from Permit to Drill Module on: 7/11/2002. MWD ROP, DGR, EWR MWD: GR, EWR, ROP - MD MWD: GR, EWR, ROP - TVD ~~--~-----------~---- -- Permit to Drill 2021460 MD 10270 TVD 4248 ADDITIONAL INFORMATION y~ Chips Received? ~ ~ Well Cored? Analysis Received? Comments: Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 9/7/2004 Well Name/No. MILNE PT UNIT S8 S-03 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23105-00-00 Completion Date 8/11/2002 Completion Status 1-01L Current Status 1-01L UIC N Daily History Received? ~ ~/N Formation Tops \ ! ì f:::-kJ Date: --~--_...~---~----~---~--'-~- - --------------- .~ "J D ~h0~"-zr--~-== / --7 ( dCd -ILl Co 4t //955 WELL LOG TRANSl\'llTTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 J\nchorage,Alaska 99501 April 14, 2003 RE: MWD Fonnation Evaluation Logs: MPS-03, AK-MW-22127 MPS-03: Digital Log Images: 50-029-23105-00 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. J\nchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 RECEIVED DetJtJN 02 2003 Signed~\v~~~ Ata8k8 OH & Gas Cons. Comm~n Anchorage ~ 0 d.. -- ¡;L\k, ~~~~\~ ~()d-)LJ Co 1 /33;;( WELL LOG TRANSMI1TAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 November 27,2002 RE: MWD Formation Evaluation Logs MPS-03, AK-MW-22127 1 LIS formatted Disc with verification listing. API#: 50-029-23105-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Sign~ (~p / ~FCE\VED DE C 0 ~ 2.00l ',. commi8m A\ ""liS Q" & ",as \,JOns. . . ,."a~ JW;bfا~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised 10/03/02 Start Production 1. Status of Well aa Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface f"--------...-.. " 3368' NSL, 4744' WEL, SEC. 07, T12N, R11 E, UM j CO~:íPLr:T:{)N r At top of productive interval j DATE ç 3791' NSL, 981'WEL, SEC. 07, T12N, R11E, UM (OB) J.z:il_~-~~ At total depth .~ VEït'¡¡:D f 615' NSL, 1152'WEL, SEC. 07, T12N, R11E, UM (OB) l~1A-'¡ 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Desigrîâf¡örrãnäS~rial No. KBE = 66.2' ADL 380110 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 7/28/2002 8/412002 8/11/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 10270 4248 FT 10270 4248 FT 0 Yes aa No 22. Type Electric or Other Logs Run MWD , LWD , GR , RES, ABI / IFR / CASANDRA CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE 28' 112' 42" 28' 7302' 9-7/8" 7200' 10256' 6-1/8" 23. CASING SIZE 20" 7-5/8" 4-1/2" WT. PER FT. 92# 29.7# 12.7# GRADE H-40 L-80 L-80 CEMENTING RECORD 260 sx Arctic Set (Approx.) 1358 sx PF 'L', 308 sx Class 'G' Uncemented Slotted Liner TUSING RECORD SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 6835' 3-1/2", 9.2#, L-80 6835' - 6887' ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 33 Bbls of Diesel Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28. CORE DATA .., Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or watek!t:t~leYi~O No core samples were taken. OCT 9 OCT 0 4 2002 Alaska Oil & Gas Gons. Commission Anchorage 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner 25. MD TVD TVD MD 7222' - 10254' 4226' - 4249' 26. 27. Date First Production September 8, 2002 Date of Test Hours Tested 9/11/2002 12 PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR Oll-Bsl TEST PERIOD 1995 WATER-Bsl 3046 GAs-McF 643 OIL-BsL GAs-McF WATER-BsL ~q,s BFî 8Ft G(: Form 10-407 Rev. 07-01-80 Classification of Service Well 7. Permit Number 202-146 8. API Number 50- 029-231 05-00 9. Unit or Lease Name Milne Point Unit 10. Well Number MPS-03 11. Field and Pool Milne Point Unit I Schrader Bluff 15. Water depth, if offshore 16. No. of Completions NIA MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) AMOUNT PULLED PACKER SET (MD) 6835' CHOKE SIZE 176/64th Oil GRAVITY-API (CORR) GAS-Oil RATIO 322 Submit In Duplicate 29. Geologic Markers Marker Name Measured Depth SBF2-NA 6605' SBF1-NB 6661' SBE4-NC 6730' SBE2-NE 6762' SBE1-NF 6875' TSBD-OA 6954' TSBC 7080' TSBD-OB 9820' SBA5 9949' 31. List of Attachments: Post Rig Summary 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 4035' 4059' 4087' 4100' 4146' 4173' 4206' 4242' 4261' RECEIVED OCT 0 4 2002 Alaska OiJ& Gas Cans. Commission Anchorage 32. I hereby certify that the f~ oing is true and .correct to the best of my knowledge Signed sondrae:an Title Technical Assistant Date\l~) - O~ -01- MPS-03 202-146 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Permit No. / Approval No. Drilling Engineer: Steve Campbell, 564-4401 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 28: If no cores taken, indicate 'none'. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. Form 10-407 Rev. 07-01-80 Well: Field: API: Permit: MPS-03 & L 1 Milne Point Unit 50-029-23105-00 I 50-029-23105-60 202-146 I 202-147 Rig Accept: 07/27102 Rig Spud: 07/28/02 Rig Release: 08/11/02 Drilling Rig: Doyon 141 POST RIG WORK 08/13/02 Pulled BPV, Pulled Ball & Rod, Pulled RP, Set DGLV, Pulled RHC body. Lost 2.62" roller out of roller stem. 08/17/02 Set Jet Pump (BP-1068, 13A). Note: Had to jar pump several times to keep moving after 3700' wlm. 08/30/02 Pressure tested surface equipment to 3000 psi. Pumped 45 bbls MeOH at 1.25 bpm wi 1250-psi max down the IA. Switched to the tubing and PT to 2500 psi. Pumped 35 bbls of diesel down tubing at 1.40 bpm wi 900-psi max. 09/08/02 Arrived location, held pre-job safety meeting, Pressure tested to 3800 psi. Start down the IA with 45 bbls MeOH @ 1 bpm wi 975 psi max. Switched to tubing and pumped 35 bbls diesel @ 1.4 bpm wi 1150 psi max. 09/09/02 Pulled & Rerun New Jet Pump, Old one had (2) pieces of 3/16" shear stock in throat from kick over tool. Other than the shear stock there were no visible signs of damage to the pump. Popped well, well lifting. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well !HI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 202-146 3. Address 8. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-23105-00 4. Location of well at surface ~'~~':':',o':.',':;:\""~ 1""',¡ ''''":''''.'r 9. Unit or Lease Name 3368' NSL, 4744'WEL, SEC. 07, T12N, R11E, UMI ..JO¡';'t;o~::.;".~;; ~LOCA.tONi~ Milne Point Unit ~;~PN~~r~~?~~¿~~~~~ 07, T12N, R11E, UM (OB)I_l'ìl.".,P.....Ji. ..:.'.'.,.. ~~"""""'" ...' -.'\...-..-...,.,:~., 10 Well Number Attotal depth VEF~ '; ~ ~ .. . ';1 . MPS-03 615' NSL, 1152' WEL, SEC. 07, T12N, R11E, UM (OB) ~._-j .t:~':~~-;'~J~~.~;~' . " .. ""..' ..;-..- .' . 11. Field and Pool 5. Elevation In feet (Indicate KB, DF, etc.) 6. Lease Designation and Senal No. Milne Point Unit 1 Schrader Bluff KBE = 66.2' ADL 380110 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 7/28/2002 8/4/2002 8/11/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 10270 4248 FT 1027Ð 4248 FT !HI Yes 0 No 22. Type Electric or Other Logs Run I MWD , LWD , GR , RES, ABI 1 IFR 1 CASANDRA 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE 20" 92# H-40 28' 112' 42" 7-5/8" 29.7# L-80 28' 7302' 9-7/8" 4-1/2" 12.7# L-80 7200' 10256' 6-1/8" Classification of Service Well 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) CEMENTING RECORD 260 sx Arctic Set (Approx.) 1358 sx PF 'L', 308 sx Class 'G' Uncemented Slotted Liner AMOUNT PULLED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner 25. TUBING RECORD SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 6835' 3-1/2",9.2#, L-80 6835' - 6887' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 33 Bbls of Diesel PACKER SET (MD) 6835' MD TVD MD TVD 7222' - 10254' 4226' - 4249' 27. Date First Production Not on Production Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) NIA PRODUCTION FOR OIL-BBL TEST PERIOD GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE. OIL -BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water.~pqmil,"cqr.ep~i~~:.. ~'~;: t 2(, t,-" ;ity if~ No core samples were taken. 28. Form 10-407 Rev. 07-01-80 fORt ,Alaska Oil & I: ~ /à't . R B OMS B Flc:rp 1 ¡¡ub.!;!\~n Duplicate ". r <II 29. Geologic Markers Marker Name Measured Depth SBF2-NA 66051 SBF1-NB 6661' SBE4-NC 6730' SBE2-NE 67621 SBE1-NF 6875' TSBD-OA 6954' TSBC 70801 TSBD-OB 9820' SBA5 9949' 31. List of Attachments: 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 4035' 4059' 4087' 4100' 4146' 41731 4206' 4242' 42611 Summary of Daily Drilling Reports, Surveys, Leak-Off Test Summary 32. I hereby certify that the fore oing is true and correct to the best of my knowledge ! ' . f - - - Signed Sondr , Title Technical Assistant M PS-03 Well Number Date 09 - DCS--07- 202-146 Permit No. I Approval No. Prepared By Name/Number: Sandra Stewman, 564-4750 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 OF~I~ti L legal Name: MPS-03 Common Name: MPS-03 Test Date 8/3/2002 Test Type Test Depth (TMD) 7,350.0 (ft) FIT BP Leak-O.ffTestSummary Test Depth (TVD) 4,232.0 (ft) AMW 8.60 (ppg) Surface Pressure 650 (psi) Leak Off Pressure (BHP) 2,541 (psi) Page 1 of 1 EMW 11.56 (ppg) Printed: 6/12/2002 2:52:26 PM ( ( . Qperations. Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-03 MPS-03 DRILL +COMPLETE DOYON DOYON 141 Start: 7/27/2002 Rig Release: 8/11/2002 Rig Number: 141 Spud Date: 7/28/2002 End: Date From - To Hours Task Code NPT Phase Description of Operations 7/27/2002 14:30 - 18:00 3.50 MOB P PRE MOVE RIG FROM MPS-05 TO MPS-03 18:00 - 19:30 1.50 RIGU P PRE RIG UP ON MPS-Q3 RIG ACCEPT TO DRILL @ 19:30 7/27/2002 19:30 - 22:00 2.50 RIGU P PRE NIPPLE UP DIVERTER 22:00 - 00:00 2.00 RIGU P PRE LOAD PIPE SHED,TAKING ON WATER FOR SPUD MUD 7/28/2002 00:00 - 01 :00 1.00 RIGU P PRE FINISH LOADING PIPE SHED 01 :00 - 08:00 7.00 DRILL P INT1 PICKING UP DRILL PIPE AND STANDING IN DERRICK HAVE 110 STANDS, MIXING SPUD MUD 08:00 - 09:30 1.50 DRILL P INT1 PICK UP HWDP AND JARS NMDC STAND IN DERRICK 09:30 - 10:00 0.50 DRILL P INT1 FUNCTION TEST DIVERTER, WITNESS OF DIVERTER TEST WAS WAIVED BY CHUCK SCHEVE AOGCC 10:00 - 12:00 2.00 DRILL P INT1 PICK UP BHA #1 12:00 - 12:30 0.50 DRILL P INT1 CIRC. AND CHECK MUD SYSTEM FOR LEAKS 12:30 - 13:00 0.50 DRILL P INT1 PRE-SPUD MEETING 13:00 - 00:00 11.00 DRILL P INT1 SPUD WELL, DIRECTIONAL DRILL 112'TO 1475'WITH 1700 PSI 450 GALS PER MIN. 60-80 RPMS 15-30K BIT WT. AST 3.25 ART 3.25 TQ 5 7/29/2002 00:00 - 10:00 10.00 DRILL P INT1 DIRECTIONAL DRILL 1475' TO 3527 ' WITH 2800 PSI 450 GALS PER MIN. 80 RPMS 25-30K BIT WT. AST1.5 ART 4 TQ 4-6000 10:00 - 11 :30 1.50 DRILL P INT1 CIRC. THREE BOTTOMS UP,WITH 2800 PSI 450 GAL PER MIN. 80 RPMS, STANDING BACK ONE STAND PER BOTTOMS UP. 11 :30 - 14:30 3.00 DRILL P INT1 PUMP OUT WITH FULL DRILLING RATE TO BHA 14:30 - 16:30 2.00 DRILL P INT1 TRIP OUT AND IN WITH BHA, CHANGE OUT BIT, PULSE TEST MWD 16:30 - 18:00 1.50 DRILL P INT1 TRIP IN HOLE WASHED 90 FT. TO BOTTOM @ 3527 18:00 - 22:30 4.50 DRILL P INT1 DIRECTIONAL DRILL 3527' TO 4458 WITH 2900 PSI 450 GALS PER MIN. 80 RPMS 25-30K BIT WT. TQ 4-7000 22:30 - 23:30 1.00 DRILL N RREP INT1 PULL ONE STAND, CIRC THRU HEAD PIN, CHANGE OUT SWIVEL PACKING ON TOP DRIVE, WASH TO BOTTOM 23:30 - 00:00 0.50 DRILL P INT1 DIRECTIONAL DRILL 4458' TO 4465' WITH 2900 PSI 450 GALS PER MIN. 80 RPMS 25-30K BIT WT. AST.75 ART 1.75 TQ 4-7000 7/30/2002 00:00 - 23:00 23.00 DRILL P INT1 DIRECTIONAL DRILL 4465' TO 6842 WITH 3280 PSI 500 GALS PER MIN. 80 RPMS 25-30K BIT WT. TQ 7000-1000 23:00 - 23:30 0.50 DRILL N RREP INT1 CIRC AND CHANGE LINER IN ONE PUMP 23:30 - 00:00 0.50 DRILL P INT1 DIRECTIONAL DRILL 6842 TO 6880' WITH 3280 PSI 500 GALS PER MIN. 80 RPMS 25-30K BIT WT. TQ 7000-1000 AST 11.5 ART 3.75 7/31/2002 00:00 - 06:00 6.00 DRILL P INT1 DIRECTIONAL DRILL 6,880 TO 7 5/8 CASING POINT AT 7,320' WITH 3600 PSI 500 GALS PER MIN. 80 RPMS 25-30K BITWT. TQ 7,000-10,000 AST 3.5 ART 1.25 06:00 - 08:30 2.50 CASE P INT1 CIRC, THREE BOTTOMS UP 4,000 PSI 525 GALS MIN., 100 RPMS, STANDING BACK ONE STAND PER BOTTOMS UP 08:30 - 15:30 7.00 CASE P INT1 PUMP OUT TO HWDP, WITH FULL DRILLING RATE ATTEMPT TO PULL@ 3,000 FT AND 1500, WELL SWABED 15:3.0 -16:30 1.00 CASE P INT1 SLIP AND CUT DRILLING LINE, SERVICE TOP DRIVE 16:30 - 18:30 2.00 CASE P INT1 TRIP IN BRIDGE @ 1,400 AND 2,200 WORKED THRU, TRIP IN TO 3,400 TO 4,275, HOLE ACTING STICKY. Printed: 8/12/2002 2:52:35 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-03 MPS-03 DRILL +COMPLETE DOYON DOYON 141 Start: 7/27/2002 Rig Release: 8/11/2002 Rig Number: 141 Spud Date: 7/28/2002 End: 7/31/2002 18:30 - 00:00 5.50 CASE P INT1 PUMPING OUT TO HWDP, AND TRIP OUT WITH BHA DOWN lOAD MWD 8/1/2002 00:00 - 01 :00 1.00 CASE P INT1 LAY DOWN MOTOR AND MWD 01 :00 - 02:30 1.50 CASE P INT1 PICK UP HOlEOPENER AND TRIP IN TO 1,350 02:30 - 06:00 3.50 CASE P INT1 REAMING 1,350 TO 2900 WITH 150 RPM 550 GALS MIN. 1600 PSI 06:00 - 06:30 0.50 CASE P INT1 TRIP IN TO 4,200' 06:30 - 13:00 6.50 CASE P INT1 REAMING 4,200 TO 7,320 WITH 150 RPM 550 GALS MIN. 3,300 PSI, TQ 8,000 13:00 - 15:30 2.50 CASE P INT1 CIRC, THREE BOTTOMS UP, WITH 150 RPMS, 3,300 PSI, 550 GALS PER MIN., STANDING BACK ONE STAND PER BOTTOMS UP. 15:30 - 18:00 2.50 CASE P INT1 SLUG PIPE, TRIP OUT TO BHA 18:00 - 19:30 1.50 CASE P INT1 LAY DOWN BHA 19:30 - 21 :00 1.50 CASE P INT1 CLEAR FLOOR, RIG UP CSG TOOLS, PJSM 21 :00 - 00:00 3.00 CASE P INT1 RUNNING 7 5/8 29.7# l-80 BTC TO 2,300' 8/2/2002 00:00 - 05:00 5.00 CASE P INT1 RUNNING 7 5/8 29.7# l-80 BTC FT FROM 2300' TO 7,301 BRIDGE @ 2,700 AND TIGHT FROM 2,700 TO 3,600- CASING HANGING UP EVERY 40' WHEN CENTRALIZER WENT BY TIGHT SPOT - WHEN CENTRALIZERS BELOW 2,700', NO PROBLEM - LANDED CSG 40K STRING WT. lEFT 05:00 - 05:30 0.50 CASE P INT1 RIG DOWN FRANKS TOOL, RIG UP CEMENT HEAD 05:30 - 08:00 2.50 CASE P INT1 CIRCULATE AND CONDITION MUD FOR CEMENT AT 6 BPM 350 PSI - MUD AT BOTTOMS UP 250 SEC/QT, 9.6 PPG - CIRCULATE TWO CASING VOLUME - FINAL MUD WT. 9.2 PPG, 46 SEC/QT VISCOSITY 08:00 - 11 :30 3.50 CASE P INT1 CEMENT 7 5/8 PRODUCTION CASING AS FOllOWS: 50 BBlS OF WATER AHEAD + 50 BBLS OF ALPHA SPACER MIXED AT 10.2 PPG, FOLLOWED BY 1155 SX CLASS 'l' MIXED AT 10.7 PPG, 854 BBlS OF SLURRY PUMPED AT AVERAGE 6.5 BPM 350 »>1150 PSI. AT 662 BBlS OF LEAD SLURRY AWAY, RETURNS STARTED TO DECREASE, SLOWED PUMP RATE TO 5 BPM. AT 750 BBlS AWAY, NO RETURNS. CONTINUE PUMPING LEAD SLURRY FOR ADDITIONAL 104 BBlS AT 2 TO 4 BPM, WORK PIPE, NO SUCCESS. IN GETTING RETURNS BACK. TAilED WITH 300 SX CLASS 'G' W/1% CACl MIXED AT 15.8 PPG, 61 BBlS OF SLURRY - DROP TOP PLUG WITH 30 BBlS OF WATER. 11 :30 - 12:30 1.00 CASE P INT1 DISPLACE WITH 9.2PPG MUD AT 6 BPM 1000 »> 1200 PSI, WITH RIG PUMP. BUMP PLUG TO 1000 PSI OVER- FLOATS OK, NO CEMENT TO SURFACE - CIP AT 1230 HRS 8/2/02 - RIG PUMP EFFICIENCY 96% 12:30 -13:30 1.00 CASE P INT1 LAY DOWN LANDING JT,FLUSH OUT DIVERTER 13:30 - 15:30 2.00 CASE P INT1 NIPPLE DOWN, DIVERTER 15:30 -17:30 2.00 CASE N CEMT INT1 RIG UP AND RUN 729 FT OF 1" PIPE FOR TOP JOB 17:30 - 19:00 1.50 CASE N CEMT INT1 CIRC DOWN 1" WITH 150 BBlS OF WATER 1.5 BBlS MIN 1000 PSI, DYE AND SPACER TO SURFACE AFTER WE PUMPED 50 BBlS WATER. 19:00 - 21 :00 2.00 CASE N CEMT INT1 CEMENT DOWN 1" WITH 1.5 BBlS MIN., 1200 PSI, PUMPED 250 SXS. CLASS l MIXED @ 10.7, 150 BBLS PUMPED, 22 BBlS TO SURFACE. Printed: 8/1212002 2:52:35 PM Operations --Summary--Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-03 MPS-03 DRILL +COMPLETE DOYON DOYON 141 Start: 7/27/2002 Rig Release: 8/11/2002 Rig Number: 141 Spud Date: 7/28/2002 End: Date From.. To Hours . Task -Code NPT Phase -- Description of Operations 8/2/2002 21 :00 - 22:00 1.00 CASE P INT1 ORIENT AND NIPPLE UP WELL HEAD, TEST TO 1000 PSI FOR 10 MIN. 22:00 - 00:00 2.00 CASE P INT1 NIPPLE UP BOPS 8/3/2002 00:00 - 00:30 0.50 CASE P INT1 NIPPLE UP, BOPS 00:30 - 05:00 4.50 CASE P INT1 RIG UP AND TESTING BOPS 250 LOW 4,000 HIGH, ANNULAR 250-2500 PSI, WITNESS OF BOP TEST WAS WAVIER BY JOHN CRISP AOOGC @ 22:00 8/2/2002, INSTALL WEAR RING 05:00 - 07:00 2.00 CASE P INT1 NIPPLE UP FLOW LINE RISER 07:00 - 09:00 2.00 CASE P INT1 PICKING UP BHA, #4 PDC SEC 2643 WITH 3/12 JETS, 4 3/4 SPERRYDRILL LOPE 1.5 MOTOW, FLOAT SUB, 43/4 DGRlEWRlDM,HAND OFF SUB, 3 FLEX COLLARS,JARS,2 -4 DP. 09:00 - 11 :00 2.00 CASE P INT1 TRIPPING IN TO 7198 11 :00 - 11 :30 0.50 CASE P INT1 CIRC FOR CSG TEST 11:30 - 12:30 1.00 CASE P INT1 TEST CSG TO 4,000 PSI FOR 30 MIN. 12:30 - 13:00 0.50 CASE N RREP INT1 REPAIR AIR COMPRESSORS 13:00 - 14:30 1.50 CASE P INT1 DRILL FLOAT AND SHOE AND NEW HOLE, FROM 7320' TO 7,350' 14:30 -15:00 0.50 CASE P INT1 CIRC FOR FIT TEST 15:00 - 15:30 0.50 CASE P INT1 FIT TEST WITH, 8.6 MUD, TVD 4232, 650 PSI = 11.5 15:30 -17:00 1.50 CASE P INT1 CIRC. AND DISPLACE HOLE WITH NEW 9.1 FLOW-PRO MUD 17:00 - 00:00 7.00 DRILL P PROD1 DRILL DIRECTIONAL 7,350' TO 8,162' WITH 80 RPMS, 2-4,000 BIT WT., 1860 PSI, 250 GALS MIN, TQ 5,000, AST 1 HR, ART 4 HR 8/4/2002 00:00 - 17:30 17.50 DRILL P PROD1 DRILL DIRECTIONAL 8,162' TO TD @ 10270' WITH 80 RPMS, 2-4,000 BIT WT., 1950 PSI, 250 GALS MIN, TQ 7,000, AST 2.5 ART 7.75 17:30 - 22:00 4.50 CASE P COMP CIRC, FOUR BOTTOMS UP WITH 280 GALS MIN. 2400 PSI ,100 RPMS 22:00 - 00:00 2.00 CASE P COMP PUMPING OUT TO CSG SHOE, DISPLACING HOLE WITH NEW MUD 8/5/2002 00:00 - 01 :00 1.00 CASE P COMP PUMPING OUT TO CSG SHOE, DISPLACING HOLE WITH NEW MUD 01 :00 - 03:00 2.00 CASE P COMP TRIPPING OUT FOR LINER 03:00 - 04:00 1.00 CASE P COMP STAND BACK BHA 04:00 - 04:30 0.50 CASE P COMP RIG UP CSG TOOLS AND PJSM 04:30 - 06:30 2.00 CASE P COMP PICKING UP 4.5 12.6# L-80 IBT SLOTTED LINER, TOTAL 76 JTS 06:30 - 07:00 0.50 CASE P COMP PICKING UP LINER HANGER 07:00 - 09:30 2.50 CASE P COMP TRIPPING IN WITH LINER, TO 10,256' LINER TOP, 7,200' 09:30 - 10:30 1.00 CASE P COMP DROP BALL, CIRC BALL DOWN @ 1.5 BBLS MIN., SET LINER WITH 1,500 PSI, SHEAR BALL WITH 1900 PSI, SET PACKER WITH 45,000 # STRING WT. 10:30 - 11 :30 1.00 CASE P COMP CUT DRILLING LINE AND SERVICE TOP DRIVE 11 :30 - 14:00 2.50 CASE P COMP TRIPPING OUT, LAY DOWN RUNNING TOOL 14:00 - 17:00 3.00 STWHIP P PROD2 PJSM, PICK UP SPACE OUT JTS,WHIPSTOCK,AND BHA 17:00 - 19:30 2.50 STWHIP P PROD2 TRIPPING IN WITH WHIPSTOCK 19:30 - 20:30 1.00 STWHIP P PROD2 ORIENTING TO 8DREGEES TO THE LEFT, TRYING TO SET ANCHOR ON WHIPSTOCK, WOULDN'T SET 20:30 - 00:00 3.50 STWHIP N DFAL PROD2 TRIPPING OUT WITH WHIPSTOCK, 8/6/2002 00:00 - 01 :30 1.50 STWHIP N DFAL PROD2 FINISH TRIP OUT WITH WHIPSTOCK, EMERG. SHEAR SUB Printed: 8/12/2002 2:52:35 PM (' Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-03 MPS-03 DRILL +COMPLETE DOYON DOYON 141 Start: 7/27/2002 Rig Release: 8/11/2002 Rig Number: 141 Spud Date: 7/28/2002 End: 8/6/2002 00:00 - 01 :30 1.50 STWHIP N DFAL PROD2 HAD CAME APART AND LEFT EVER THING BELOW IT IN HOLE, TOTAL OF 246.94 FT., TOP OF FISH IS @ 6961.05, SEAR SUB FISHING NECK IS 3 1/4, LAY DOWN WHIPSTOCK AND MILLS, MWD 01 :30 - 02:00 0.50 STWHIP N DFAL PROD2 PICK UP FISHING BHA, 5 3/4 OVERSHOT WITH 3 1/4 GRAPPLE,BUMPER SUB,OIL JARS,12 DC,15 HWP 02:00 - 03:30 1.50 STWHIP N DFAL PROD2 TRIP IN WITH OVERSHOT TO 6961 03:30 - 04:00 0.50 STWHIP N DFAL PROD2 WORKING OVER FISH AND JAR FREE, WITH 50,000 OVERPULL 04:00 - 07:00 3.00 STWHIP N DFAL PROD2 TRIPPING OUT WITH FISH - LD FISH AND FISHING TOOLS 07:00 - 11 :00 4.00 STWHIP N DFAL PROD2 MAKE UP WHIPSTOCK ASSEMBLY - RIH TO 7207' 11 :00 - 11 :30 0.50 STWHIP P PROD2 ORIENT AND SET WHIPSTOCK TO 18 L OF HIGH SIDE - TOP OF WINDOW 6943' 11 :30 - 16:30 5.00 STWHIP P PROD2 MILL WINDOW FROM 6943' TO 6967' - TOP WINDOW 6943 - BTM WINDOW 6955' - UPPER MILL 6.75" IN GAUGE - WOB 2K TO 15K - GPM 280 - PP 1450 - RPM 100 TO 130 - TQ 7K ON BTM - 4K OFF BTM - PU 112K - SO 75K - ROT 87K 16:30 - 18:00 1.50 STWHIP P PROD2 PUMP SWEEP - CIRC 3 X - @ 290 GPM - PP 1500 - RPM 120 - TQ 4K - PU 112 - SO 78 - ROT 90 18:00 - 20:30 2.50 STWHIP P PROD2 OBSERVE WELL - PUMP DRY JOB - POH TO BHA 20:30 - 21 :30 1.00 STWHIP P PROD2 STAND IN DERRICK - DC'S - HWDP - LD BUMPER SUB - MWD - MILLS 21 :30 - 22:00 0.50 STWHIP P PROD2 MAKE UP STACK WASHER - FLUSH OUT BOPS - LAY DOWN STACK WASHER 22:00 - 23:30 1.50 STWHIP P PROD2 PU MOTOR - MAKE UP BIT - PU - MWD - CHANGE OUT PULSER - ORIENT - UP LOAD MWD 23:30 - 00:00 0.50 STWHIP P PROD2 RIH TO 1250' 8n /2002 00:00 - 00:30 0.50 STWHIP P PROD2 RIG SERVICE TOP DRIVE - CHANGE OUT SPINNERS ON IRON ROUGHNECK 00:30 - 02:30 2.00 STWHIP P PROD2 RIH TO 6917' - ORIENT - CON'T RIH TO 6967' - NO PROBLEMS GOING THROUGH WINDOW 02:30 - 09:00 6.50 DRILL P PROD2 DIRECTIONAL DRILL FROM 6967' TO 7507' - WOB 0 TO 3K - RPM 90 - TQ ON BTM 5K - TQ OFF BTM 4K - GPM 250 - PP ON BTM 1870 - PP OFF BTM 1660 - PU 108K - SO 67 - ROT 82 09:00 - 09:30 0.50 DRILL N DFAL PROD2 OBSERVE WELL - PUMP OUT TO 7000' - PULL THROUGH WINDOW - NO PROBLEMS - TRIP FOR LWD FAILURE - LOG QUAIL TV POOR - PROBLEM WITH PULSER 09:30 - 12:00 2.50 DRILL N DFAL PROD2 OBSERVE WELL - PUMP DRY JOB - POH TO BHA 12:00 - 13:30 1.50 DRILL N DFAL PROD2 STAND BACK JARS - FLEX DC'S - DOWN LOAD MWD - C/O PULSER - GAUGE BIT - ORIENT - UP LOAD MWD - RIH W / BHA - PULSE TEST MWD 13:30 -16:00 2.50 DRILL N DFAL PROD2 TIH WITH 4" DP TO 6806' - FILLING PIPE EVERY 25 STANDS 16:00 - 17:00 1.00 DRILL N DFAL PROD2 CUT DRLG LINE - RIG SERVICE TOP DRIVE - BLOCKS 17:00 - 17:30 0.50 DRILL N DFAL PROD2 ORIENT TO HI-SIDE - TRIP THROUGH WINDOW - CON'T RIH TO 7461' - PRECAUCTIONARY WASH FROM 7461' TO 7507' 17:30 - 00:00 6.50 DRILL P PROD2 DIRECTIONAL DRILL FROM 7507' TO 8348' - WOB 0 TO 5K - RPM 90 - TQ ON BTM 8K - TQ OFF BTM 6K - GPM 250 - PP ON BTM 1825 - OFF BTM 1700 - PU 120 - SO 61 - ROT 81 8/8/2002 00:00 - 17:30 17.50 DRILL P PROD2 DIRECTIONAL DRILL FROM 8348' TO T.D. @ 10260' - WOB 0 TO 4K - RPM 90 - TQ ON BTM 7K - TQ OFF BTM 6K - GPM Printed: 8/1212002 2:52:35 PM Legal Well Name: MPS-03 Common Well Name: MPS-03 Spud Date: 7/28/2002 Event Name: DRILL +COMPLETE Start: 7/27/2002 End: Contractor Name: DOYON Rig Release: 8/11/2002 Rig Name: DOYON 141 Rig Number. 141 From - To Hours' Task Code NPT Phase Description of Operations 8/8/2002 00:00 - 17:30 17.50 DRILL P PROD2 250 - PP ON BTM 1960 - OFF BTM 1760 - PU 120K - SO 46- ROT 82 17:30 - 21 :30 4.00 CASE P PROD2 CIRCULATE CLEAN HOLE 4 X BTM'S UP - 18000 STKS - 280 GPM -100 RPM 21 :30 - 00:00 2.50 CASE P PROD2 PUMP OUT TO 7461' - SPOTTING NEW MUD IN OPEN HOLE - 9.1 FLO-PRO - 8/9/2002 00:00 - 00:30 0.50 CASE P PROD2 CON'T PUMP OUT TO 7000' - PULL 1 STAND TO 6900' THROUGH WINDOW WITHOUT PUMP OR ROTATION - NO PROBLEMS COMING THROUGH WINDOW 00:30 - 02:30 2.00 CASE P PROD2 DOWN LOAD MWD - LAY DOWN BHA 02:30 - 03:30 1.00 CASE P COMP MAKE UP BHA #10 - (BAKER) WHIPSTOCK RETRIEVING TOOL ASSEMBLY 03:30 - 06:00 2.50 CASE P COMP RIH WITH (BAKER) RETRIEVING TOOL 06:00 - 06:30 0.50 CASE P COMP ORIENT RETRIEVING TOOL - LATCH ONTO (BAKER) WHIPSTOCK - PULL LOOSE - OBSERVE WELL 06:30 - 09:30 3.00 CASE P COMP POH WITH WHIPSTOCK TO BHA 09:30 - 12:00 2.50 CASE P COMP LAY DOWN BHA - WHIPSTOCK - RETRIEVING TOOL 12:00 -15:00 3.00 CASE P COMP PJSM - RU CASING TOOLS FOR 4.5" SLOTTED LINER - PU 4.5" SLOTTED LINER - 81 TOTAL JTS RAN 15:00 - 15:30 0.50 CASE P COMP MAKE UP (BAKER) HOOK WALL HANGER ASSEMBLY - CLEAR FOOR 15:30 - 17:30 2.00 CASE P COMP RIH WITH 4" DP /4.5" SLOTTED LINER TO 10204' - WENT THROUGH WINDOW ON FIRST ATTEMPT - HOOKED HANGER ON FIRST ATTEMPT @ 6955' 17:30 - 18:30 1.00 CASE P COMP DROP BALL - PRESSURE UP TO 3200 RELEASE HR TOOL - BLEED PRESSURE OFF - PU TO CHECK STRING WEIGHT - PRESSURE UP TO SHEAR BALL SEAT @ 4200 18:30 - 20:30 2.00 CASE P PROD2 OBSERVE WELL - PUMP DRY JOB - POH TO 3363' 20:30 - 22:30 2.00 CASE P PROD2 LAY DOWN 108 JOINTS OF 4" DP - SERVICE BREAK (BAKER) LINER RUNNING TOOL - LAY DOWN RUNNING TOOL 22:30 - 23:00 0.50 CASE P PROD2 SERVICE TOP DRIVE AND BLOCKS 23:00 - 00:00 1.00 CASE P PROD2 MAKE UP MULE SHOE - XO - RIH TO 2429' 8/10/2002 00:00 - 01 :30 1.50 CASE P COMP CON'T RIH WITH 4" DRILL PIPE TP 6886' 01 :30 - 03:30 2.00 . CASE P COMP BREAK CIRC - DISPLACE MUD WITH - 320 BBLS 8.8 SEAWATER - 50 BBL HI-VIS SPACER - 280 BBLS 8.8 SEAWATER - 330 BBLS 9.2 SEAWATER - GPM 441 - PP 960 - RPM 115 03:30 - 07:30 4.00 CASE P COMP OBSERVE WELL - WELL STATIC - LAYING DOWN 4" DRILL PIPE 07:30 - 08:00 0.50 CASE P COMP PULL WEAR RING 08:00 - 09:00 1.00 CASE P COMP CLEAR FLOOR OF ALL 4" RENTAL TOOLS 09:00 - 10:00 1.00 RUNCO~ COMP PJSM ON RUNNING COMPLETION - RU CASING TOOLS 10:00 - 19:30 9.50 RUNCO~ COMP PU AND RUN 164 JOINTS 4.5" L-80 12.6# IBT TUBING - 89 CANNON CLAMPS WERE USED ON I WIRE 19:30 - 21 :00 1.50 RUNCOI\P COMP MAKE UP TUBING HANGER - INSTALL I WIRE TO HANGER - TEST - LAND TUBING - LAY DOWN LANDING JOINT - TEST TWC TO 1000 PSI 21 :00 - 21 :30 0.50 RIGD P COMP CHANGE BOTTOM RAMS FROM 4" TO 3.5" 21 :30 - 22:30 1.00RIGD P COMP NIPPLE DOWN BOP'S 22:30 - 00:00 1.50 RIGD P COMP NIPPLE UP FMC ADAPTER FLANGE - 4 1/16 5K CIW TREE - TEST TUBING HANGER VOID TO 5K 8/11/2002 00:00 - 01 :00 1.00 RIGD P COMP RIG UP HB&R - TEST LINES TO 5K - TEST TREE TO 5K Printed: 8/12/2002 2:52:35 PM Legal Well Name: MPS-03 Common Well Name: MPS-03 Spud Date: 7/28/2002 Event Name: DRILL +COMPLETE Start: 7/27/2002 End: Contractor Name: DOYON Rig Release: 8/11/2002 Rig Name: DOYON 141 Rig Number: 141 Date From - To HoUrs. Task Code NPT Phase DesCription of Operations 8/11/2002 00:00 - 01 :00 1.00 RIGD P COMP FOR 10 MINS 01 :00 - 01 :30 0.50 RIGD P COMP PULL TWC 01 :30 - 06:00 4.50 RIGD P COMP CIRCULATE & HEAT 9.2 COMPLETION FLUID TO 100+ DEGREE'S TO SET PACKER - ADDED 25 GALS PER 100 BBLS CORRISION INHIBITOR - SPOTTED ON BACK SIDE OF TUBING 06:00 - 07:00 1.00 RIGD P COMP DROP BALL - PRESSURE UP ON TUBING TO 4000 PSI TO SET PACKER - HOLD FOR 30 MINS - BLEED PRESSURE TO 2500 07:00 - 08:00 1.00 RIGD P COMP WITH 2500 PSI ON TUBING - PRESSURE UP TO 4500 PSI ON ANNULUS - HOLD PRESSURE FOR 30 MINS ON ANNULUS 08:00 - 10:00 2.00 RIGD P COMP BLEED PRESSURE DOWN ON TUBING - SHEAR RP VALVE - BLEED ALL PRESURE OFF BOTH TUBING / ANNULUS TO HB&R - PUMP 33 BBLS DIESEL IN ANNULUS WITH HB&R - SUCK BACK 2 BBLS WITH HB&R - SHUT IN WELL - RIG DOWN HB&R - U-TUBE WELL 10:00 - 11 :00 1.00 RIGD P COMP SET BPV - SECURE WELL 11 :00 - 17:00 6.00 RIGD P COMP CLEAN - ROCK WASHER - PITS PREPARE LOCATION TO MOVE RIG TO MPS-311- LEVEL LOCATION - MOVE DIRT FROM MPS-33 CELLAR - MOVE EQUIPMENT FOR RIG MOVE - SUCK OUT WELL CELLARS WITH SUPER SUCKER 17:00 -18:00 1.00 RIGD P COMP CUT DRILLING LINE - SERVICE TOP DRIVE AND BLOCKS - RELEASE RIG @ 18:00 HRS Printed: 8/1212002 2:52:35 PM AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 d,~-} Yfp 26-Aug-02 Re: Distribution of Survey Data for Well MPS-03 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window I Kickoff Survey Projected Survey: 'MD 'MD (if applicable) 10,270.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECE\VED AUG 2. 7 2002. Alaska Oi, & Gas Cons. COmmission Anchorage BP EXPLORA TION (ALASKA) INc()~ ~ Milne Point Unit 1/1/, ... BPXA 'y~ Milne Point MPS, Slot MPS-03 ~' MPS-03 Job No. AKZZ22127, Surveyed: 4 August, 2002 SURVEY REPORT 19 August, 2002 Your Ref: API 500292310500 Surface Coordinates: 6000037.00 N, 566047.74 E (70024' 37.9348" N, 149027' 43.8689" W) Kelly Bushing: 66.20ft above Mean Sea Level spe"''''Y-IIul1 DRILLING SèAVICES A Halliburton Company Survey Ref: svy10154 Sperry-Sun Drilling Services . Survey Report for MPS-03 Your Ref: API 500292310500 ð Job No. AKZZ22127, Surveyed: 4 August. 2002 . ~~ BP EXPLORATION (ALASKA) INC. ~ 1/); BPXA Milne Point Unit 1ç¿lne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical ~ Depth Incl. Azim. Depth Depth Northings Eastings . Northings Eastings Rate Section mment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 0.00 0.000 0.000 -66.20 0.00 O.OON 0.00 E 6000037.00 N 566047.74 E 0.00 Tolerable Gyro 177.00 0.800 302.000 110.79 176.99 0.65N 1.05W 6000037.65 N 566046.69 E 0.452 -1.23 AK-6 BP IFR-AK 296.89 0.350 11.750 230.68 296.88 1.46 N 1.68W 6000038.44 N 566046.04 E 0.629 -2.22 386.03 1.700 53.300 319.80 386.00 2.51 N 0.57W 6000039.51 N 566047.15 E 1.634 -1.98 475.36 4.350 48.050 409.00 475.20 5.57 N 3.02E 6000042.60 N 566050.71 E 2.980 -1.00 564.01 7.610 50.070 497.16 563.36 11.59 N 10.02 E 6000048.68 N 566057.66 E 3.684 0.89 654.06 12.640 52.270 585.78 651.98 21.45 N 22.39 E 6000058.65 N 566069.94 E 5.601 4.69 749.43 1 3.880 54.280 678.60 744.80 34.51 N 39.93 E 6000071.87 N 566087.37 E 1.387 10.65 840.17 15.950 54.690 766.28 832.48 48.08 N 58.94 E 6000085.60 N 566106.26 E 2.284 17.47 937.24 18.070 49.890 859.10 925.30 65.49 N 81.35 E 6000103.20 N 566128.50 E 2.618 24.63 1028.10 18.670 52.410 945.33 1011.53 83.44 N 103.65 E 6000121.35 N 566150.65 E 1.095 31.38 1124.49 18.620 55.280 1036.67 1102.87 101.61 N 128.52 E 6000139.75 N 566175.36 E 0.953 40.04 1217.42 20.660 54.200 1124.19 1190.39 119.66 N 154.01 E 6000158.01 N 566200.69 E 2.230 49.27 1310.76 24.350 48.410 1210.41 1276.61 142.07 N 181.77 E 6000180.67 N 566228.25 E 4.607 57.63 1404.51 28.810 44.620 1294.24 1360.44 171.00 N 212.11 E 6000209.86 N 566258.33 E 5.087 64.07 1498.15 31.660 45.360 1375.13 1441.33 204.33 N 245.45 E 6000243.49 N 566291.38 E 3.069 70.21 1591.20 31.050 46.320 1454.60 1520.80 238.06 N 280.19 E 6000277.53 N 566325.81 E 0.847 77.21 1684.56 32.790 49.640 1533.84 1600.04 271.07 N 316.87 E 6000310.86 N 566362.20 E 2.647 86.20 1774.32 31.900 49.320 1609.67 1675.87 302.27 N 353.37 E 6000342.38 N 566398.43 E 1.010 96.15 1871.59 31.770 51.070 1692.31 1758.51 335.11 N 392.79 E 6000375.57 N 566437.55 E 0.958 107.40 1964.73 34.390 51.890 1770.35 1836.55 366.76 N 432.56 E 6000407.57 N 566477.04 E 2.854 119.68 2058.12 40.320 52.880 1844.55 1910.75 401.30 N 477.45 E 6000442.51 N 566521.62 E 6.382 134.23 2151.71 45.760 53.470 1912.93 1979.13 439.56 N 528.57 E 6000481.21 N 566572.40 E 5.828 151.48 2244.60 46.230 54.930 1977.46 2043.66 478.64 N 582.76 E 6000520.77 N 566626.24 E 1.239 170.65 2337.63 48.950 55.300 2040.20 2106.40 517.91 N 639.10 E 6000560.54 N 566682.23 E 2.938 191.41 2431.21 53.070 54.490 2099.07 2165.27 559.74 N 698.58 E 6000602.90 N 566741.35 E 4.454 213.11 2524.33 58.040 53.990 2151.72 2217.92 604.61 N 760.87 E 6000648.32 N 566803.24 E 5.356 235.18 2619.52 62.720 54.390 2198.76 2264.96 653.01 N 827.97 E 6000697.31 N 566869.90 E 4.930 258.91 2713.14 63.820 55.210 2240.86 2307.06 701.21 N 896.29 E 6000746.11 N 566937.79 E 1.412 283.75 2806.80 66.870 54.630 2279.93 2346.13 750.13 N 965.94 E 6000795.64 N 567007.01 E 3.305 309.19 19 August, 2002 - 9:42 Page 20f7 DrillQlIest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-03 Your Ref: AP/500292310500 Job No. AKZZ22127, Surveyed: 4 August. 2002 D S BP EXPLORATION (ALASKA) INC. ~ !J BPXA Milne Point Unit . 'h Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg vertlv$:. Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section omment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 2900.80 68.100 54.980 2315.93 2382.13 800.17 N 1036.90 E 6000846.31 N 567077.52 E 1.353 334.98 2994.33 68.940 55.280 2350.17 2416.37 849.93 N 1108.31 E 6000896.70 N 567148.49 E 0.946 361 .31 3087.77 69.940 55.700 2382.99 2449.19 899.50 N 1180.40 E 6000946.90 N 567220.14 E 1.150 388.29 3180.47 70.420 56.860 2414.42 2480.62 947.91 N 1252.93 E 6000995.95 N 567292.24 E 1.286 416.34 3273.15 71.040 56.330 2445.01 2511.21 996.07 N 1325.97 E 6001044.76 N 567364.85 E 0.860 444.92 3366.75 71 .600 56.350 2474.99 2541.19 1045.22 N 1399.77 E 6001094.56 N 567438.21 E 0.599 473.52 3459.35 71.440 55.680 2504.34 2570.54 1094.31 N 1472.59 E 6001144.29 N 567510.60 E 0.708 501.37 3550.18 71.280 56.380 2533.37 2599.57 1142.40 N 1543.97 E 6001193.01 N 567581.55 E 0.751 528.69 3643.66 71.410 56.440 2563.27 2629.47 1191.40 N 1617.75 E 6001242.66 N 567654.89 E 0.152 557.36 3737.17 71.850 56.850 2592.74 2658.94 1240.19 N 1691.87 E 6001292.11 N 567728.58 E 0.628 586.43 3830.91 73.250 56.640 2620.85 2687.05 1289.23 N 1766.65 E 6001341.80 N 567802.92 E 1.509 615.87 3924.90 70.770 58.310 2649.88 2716.08 1337.30 N 1842.01 E 6001390.54 N 567877.86 E 3.133 646.36 4018.26 71.200 59.220 2680.30 2746.50 1383.07 N 1917.48 E 6001436.97 N 567952.92 E 1.030 678.34 4111.02 69.680 60.090 2711.35 2777.55 1427.23 N 1992.91 E 6001481.79 N 568027.95 E 1.862 711.26 4204.55 67.830 60.350 2745.24 2811.44 1470.52 N 2068.57 E 6001525.76 N 568103.22 E 1.995 744.89 4297.51 67.080 61.540 2780.88 2847.08 1512.22 N 2143.62 E 6001568.12 N 568177.90 E 1.431 779.02 4391.47 64.850 62.890 2819.15 2885.35 1552.22 N 2219.53 E 6001608.79 N 568253.45 E 2.712 814.85 4484.83 62.950 66.710 2860.24 2926.44 1587.93 N 2295.35 E 6001645.17 N 568328.96 E 4.200 853.24 4578.10 63.080 72.880 2902.59 2968.79 1616.62 N 2373.30 E 6001674.54 N 568406.65 E 5.896 897.59 -_. 4671.47 61.230 79.010 2946.23 3012.43 1636.69 N 2453.32 E 6001695.32 N 568486.49 E 6.133 948.83 4764.35 59.610 83.200 2992.10 3058.30 1649.20 N 2533.09 E 6001708.53 N 568566.15 E 4.293 1004.48 4856.89 58.270 88.990 3039.87 3106.07 1654.62 N 2612.13 E 6001714.65 N 568645.13 E 5.551 1063.85 4951.24 57.410 94.930 3090.12 3156.32 1651.91 N 2691.90 E 6001712.65 N 568724.92 E 5.406 1128.77 5044.96 57.110 96.640 3140.81 3207.01 1643.97 N 2770.32 E 6001705.40 N 568803.41 E 1.568 1195.81 5138.16 55.160 98.090 3192.74 3258.94 1634.06 N 2847.07 E 6001696.17 N 568880.24 E 2.459 1262.71 5232.14 54.330 101.490 3247.00 3313.20 1621.02 N 2922.67 E 6001683.81 N 568955.96 E 3.083 1330.61 5325.14 53.750 108.270 3301.65 3367.85 1601.73 N 2995.36 E 6001665.15 N 569028.82 E 5.933 1400.01 5418.44 54.630 112.450 3356.26 3422.46 1575.40 N 3066.26 E 6001639.45 N 569099.95 E 3.753 1472.28 5511 .4 1 54.570 116.410 3410.13 3476.33 1544.07 N 3135.24 E 6001608.73 N 569169.20 E 3.472 1546.07 5604.56 56.860 119.080 3462.60 3528.80 1508.22 N 3203.33 E 6001573.49 N 569237.60 E 3.413 1621.90 19 August, 2002 - 9:42 Page 30f7 DrillQtJest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-03 Your Ref: API 500292310500 D~~ Job No. AKZZ22127, Surveyed: 4 August, 2002 BP EXPLORATION (ALASKA) INC. """ . * BPXA W~oint MPS Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical ~ Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comm t (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 5699.03 57.270 122.440 3513.98 3580.18 1467.68 N 3271.44 E 6001533.55 N 569306.07 E 3.016 1700.62 5792.73 55.220 125.410 3566.05 3632.25 1424.23 N 3336.08 E 6001490.67 N 569371.10 E 3.425 1778.35 -~~". 5886.12 55.150 128.920 3619.38 3685.58 1377.92 N 3397.17 E 6001444.91 N 569432.59 E 3.086 1855.00 5979.59 55.990 131.920 3672.23 3738.43 1327.94 N 3455.84 E 6001395.45 N 569491.71 E 2.796 1931.99 6072.23 58.770 136.650 3722.19 3788.39 1273.45 N 3511.64 E 6001341.45 N 569547.98 E 5.243 2009.42 6165.82 61.690 140.920 3768.67 3834.87 1212.34 N 3565.11 E 6001280.82 N 569601.98 E 5.041 2089.05 6258.65 60.830 145.190 3813.32 3879.52 1147.32 N 3614.02 E 6001216.23 N 569651.47 E 4.138 2167.45 6352.24 62.820 151.920 3857.55 3923.75 1076.97 N 3656.98 E 6001146.27 N 569695.06 E 6.685 2244.37 6445.58 63.340 157.170 3899.83 3966.03 1001.86 N 3692.73 E 6001071.47 N 569731 .46 E 5.046 2318.47 6539.27 64.420 165.100 3941.13 4007.33 922.34 N 3719.87 E 6000992.19 N 569759.31 E 7.685 2388.44 6632.85 65.650 170.380 3980.65 4046.85 839.47 N 3737.86 E 6000909.49 N 569778.03 E 5.281 2453.17 6726.51 65.280 174.030 4019.55 4085.75 755.07 N 3749.42 E 6000825.20 N 569790.33 E 3.567 2513.74 6819.15 65.640 176.950 4058.03 4124.23 671.08 N 3756.04 E 6000741.26 N 569797.70 E 2.893 2570.16 6913.12 69.230 179.090 4094.09 4160.29 584.37 N 3759.01 E 6000654.59 N 569801 .44 E 4.361 2625.33 7005.61 74.090 179.120 4123.18 4189.38 496.62 N 3760.38 E 6000566.85 N 569803.59 E 5.255 2679.87 7099.62 79.860 179.480 4144.36 4210.56 405.07 N 3761.50 E 6000475.32 N 569805.51 E 6.149 2736.51 7193.29 84.830 179.950 4156.84 4223.04 312.27 N 3761.96 E 6000382.52 N 569806.79 E 5.329 2793.40 7251 .22 84.460 179.360 4162.24 4228.44 254.59 N 3762.31 E 6000324.85 N 569807.65 E 1.198 2828.81 7347.63 86.920 180.400 4169.49 4235.69 158.46 N 3762.51 E 6000228.73 N 569808.70 E 2.769 2887.52 .-, 7392.15 86.430 179.340 4172.07 4238.27 114.02 N 3762.61 E 6000184.29 N 569809.19 E 2.619 2914.67 7440.71 86.190 178.980 4175.19 4241.39 65.56 N 3763.32 E 6000135.84 N 569810.33 E 0.890 2944.75 7485.46 86.120 178.920 4178.20 4244.40 20.92 N 3764.14 E 6000091.21 N 569811.54 E 0.206 2972.59 7533.38 86.680 179.160 4181.20 4247.40 26.90 S 3764.94 E 6000043.40 N 569812.77 E 1.271 3002.35 7579.24 86.610 179.310 4183.89 4250.09 72.67 S 3765.55 E 5999997.63 N 569813.78 E 0.360 3030.72 7626.47 90.860 180.760 4184.93 4251.13 119.88 S 3765.52 E 5999950.42 N 569814.17 E 9.507 3059.45 7671.41 93.940 182.770 4183.05 4249.25 164.75 S 3764.14 E 5999905.54 N 569813.19 E 8.181 3085.68 7723.59 93.320 182.280 4179.75 4245.95 216.78 S 3761.84 E 5999853.50 N 569811.35 E 1.513 3115.55 7765.07 92.710 181.700 4177.56 4243.76 2p8.17 S 3760.40 E 5999812.09 N 569810.28 E 2.028 3139.62 7813.96 93.570 182.240 4174.89 4241.09 306.96 S 3758.73 E 5999763.29 N 569809.03 E 2.076 3168.01 7858.58 94.380 182.710 4171.79 4237.99 351.43 S 3756.80 E 5999718.80 N 569807.51 E 2.098 3193.57 19 August, 2002 - 9:42 Page 4 of7 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services . . Survey Report for MPS-03 bS Your Ref: API 500292310500 >~ Job No. AKZZ22127, Surveyed: 4 August, 2002 BP EXPLORATION (ALASKA) INC. ~~lG BPXA Milne Point Unit i ~nt MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inet. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 7908.86 90.120 182.760 4169.82 4236.02 401.60 S 3754.41 E 5999668.61 N 569805.55 E 8.473 3222.23 7952.41 89.570 181.700 4169.94 4236.14 445.12 S 3752.71 E 5999625.08 N 569804.24 E 2.742 3247.39 8000.74 90.180 182.380 4170.04 4236.24 493.42 S 3750.99 E 5999576.77 N 569802.95 E 1.890 3275.44 8045.63 91.600 182.090 4169.35 4235.55 538.27 S 3749.24 E 5999531.91 N 569801.60 E 3.229 3301.37 8094.23 92.090 182.210 4167.78 4233.98 586.81 S 3747.42 E 5999483.35 N 569800.20 E 1.038 3329.49 8139.33 92.030 180.930 4166.16 4232.36 631.86 S 3746.19 E 5999438.29 N 569799.37 E 2.839 3355.96 8188.21 91.660 180.870 4164.59 4230.79 680.71 S 3745.42 E 5999389.44 N 569799.03 E 0.767 3385.10 8232.33 91.720 179.880 4163.28 4229.48 724.81 S 3745.13 E 5999345.34 N 569799.13 E 2.247 3411.73 8281.62 91.970 179.720 4161.70 4227.90 774.07 S 3745.30 E 5999296.08 N 569799.74 E 0.602 3441.88 8326.28 90.000 180.970 4160.93 4227.13 818.72 S 3745.03 E 5999251.43 N 569799.87 E 5.224 3468.86 8377.33 89.750 180.110 4161.04 4227.24 869.77 S 3744.55 E 5999200.38 N 569799.84 E 1.754 3499.57 8419.78 89.750 184.220 4161.23 4227.43 912.18S 3742.95 E 5999157.96 N 569798.61 E 9.682 3524.13 8467.92 90.740 184.660 4161.02 4227.22 960.17 S 3739.22 E 5999109.93 N 569795.31 E 2.250 3550.41 8512.48 90.980 184.810 4160.35 4226.55 1004.58 S 3735.54 E 5999065.50 N 569792.02 E 0.635 3574.53 8561.95 90.860 184.540 4159.56 4225.76 1053.88 S 3731.51 E 5999016.16 N 569788.43 E 0.597 3601.37 8606.12 90.860 184.120 4158.89 4225.09 1097.92 S 3728.18 E 5998972.10 N 569785.48 E 0.951 3625.54 8653.46 91.600 183.290 4157.88 4224.08 1145.14 S 3725.12 E 5998924.84 N 569782.84 E 2.349 3651.89 8699.50 91.720 183.130 4156.54 4222.74 1191.09 S 3722.54 E 5998878.87 N 569780.67 E 0.434 3677.83 8747.88 92.280 182.660 4154.86 4221.06 1239.38 S 3720.10 E 5998830.56 N 569778.65 E 1.511 3705.30 8792.80 92.340 182.530 4153.05 4219.25 1284.22 S 3718.07 E 5998785.71 N 569777.02 E 0.319 3731.00 8842.61 90.980 184.310 4151.60 4217.80 1333.92 S 3715.10 E 5998735.99 N 569774.49 E 4.496 3758.92 8886.23 90.550 184.110 4151.02 4217.22 1377.41 S 3711.90 E 5998692.46 N 569771.67 E 1.087 3782.87 8935.42 90.550 183.820 4150.55 4216.75 1426.48 S 3708.49 E 5998643.37 N 569768.70 E 0.590 3810.06 8980.08 90.490 183.160 4150.14 4216.34 1471.06 S 3705.78 E 5998598.77 N 569766.38 E 1 .484 3835.06 9028.92 90.490 182.370 4149.72 4215.92 1519.84 S 3703.42 E 5998549.97 N 569764.46 E 1.617 3862.90 9072.91 90.430 181.840 4149.37 4215.57 1563.80 S 3701.80 E 5998506.00 N 569763.23 E 1.212 3888.39 9121.25 90.370 181.890 4149.03 4215.23 1612.11 S 3700.23 E 5998457.67 N 569762.08 E 0.162 3916.57 9167.33 90.920 181.680 4148.52 4214.72 1658.17 S 3698.80 E 5998411.61 N 569761.05 E 1.278 3943.49 9215.38 92.590 183.270 4147.04 4213.24 1706.15 S 3696.72 E 5998363.61 N 569759.41 E 4.798 3971.07 9260.64 93.080 184.120 4144.81 4211.01 1751.26 S 3693.81 E 5998318.48 N 569756.89 E 2.166 3996.23 19 August, 2002 - 9:42 Page 5 0'7 DrillQucst 2.00.08.005 Sperry-Sun Drilling Services ~. . /,) Survey Report for MPS-03 1/ .~~, Your Ref: API 500292310500 ~"~y~; Job No. AKZZ22127, Surveyed: 4 Augllst, 2002 . /J BP EXPLORATION (ALASKA) INC. ' Ill: l~ BPXA Milne Point Unit . ~int MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/1 OOft) 9309.91 93.200 183.550 4142.11 4208.31 1800.34 S 3690.52 E 5998269.36 N 569754.04 E 1.181 4023.52 9353.82 89.630 184.920 4141.02 4207.22 1844.11 S 3687.28 E 5998225.57 N 569751.18 E 8.708 4047.61 9404.56 86.920 184.480 4142.55 4208.75 1894.65 S 3683.12 E 5998174.99 N 569747.47 E 5.411 4075.10 9446.99 85.200 184.550 4145.46 4211.66 1936.85 S 3679.79 E 5998132.77 N 569744.51 E 4.057 4098.16 9496.76 85.200 184.310 4149.63 4215.83 1986.30 S 3675.96 E 5998083.29 N 569741 .12 E 0.481 4125.24 9540.84 88.770 185.190 4151.95 4218.15 2030.16 S 3672.31 E 5998039.40 N 569737.86 E 8.341 4149.06 9588.68 88.710 184.740 4153.00 4219.20 2077.81 S 3668.17 E 5997991.71 N 569734.15 E 0.949 4174.80 9634.01 87.230 184.090 4154.61 4220.81 2122.97 S 3664.69 E 5997946.52 N 569731.06 E 3.566 4199.55 9681.76 87. 11 0 183.440 4156.96 4223.16 2170.56 S 3661.56 E 5997898.91 N 569728.35 E 1.383 4226.05 9727.21 82.100 182.230 4161.23 4227.43 2215.74 S 3659.32 E 5997853.71 N 569726.51 E 11.337 4251.79 9777.33 81.910 181.930 4168.21 4234.41 2265.34 S 3657.52 E 5997804.10 N 569725.15 E 0.704 4280.57 9820.87 77.840 183.410 4175.86 4242.06 2308.14 S 3655.52 E 5997761.27 N 569723.53 E 9.928 4305.06 9871.11 78.360 184.050 4186.22 4252.42 2357.20 S 3652.32 E 5997712.19 N 569720.77 E 1.620 4332.41 9914.15 83.400 185.880 4193.04 4259.24 2399.52 S 3648.64 E 5997669.84 N 569717.46 E 12.439 4355.26 9962.89 89.260 187.420 4196.16 4262.36 2447.81 S 3643.01 E 5997621.50 N 569712.25 E 12.429 4380.21 10007.26 95.670 189.140 4194.25 4260.45 2491.65 S 3636.63 E 5997577.61 N 569706.26 E 14.956 4401.86 10058.05 95.920 189.450 4189.12 4255.32 2541.52 S 3628.47 E 5997527.67 N 569698.54 E 0.782 4425.76 10100.87 91.910 187.660 4186.20 4252.40 2583.75 S 3622.12E 5997485.38 N 569692.57 E 10.251 4446.44 10151.33 88.950 187.220 4185.82 4252.02 2633.78 S 3615.59 E 5997435.30 N 569686.48 E 5.930 4471.73 ~'<;, 10202.49 92.710 186.970 4185.08 4251.28 2684.54 S 3609.27 E 5997384.49 N 569680.61 E 7.366 4497.64 10270.00 92.710 186.970 4181.89 4248.09 2751.47 S 3601.09 E 5997317.48 N 569673.02 E 0.000 4531.92 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 127.524° (True). Based upon Minimum Curvature type calculations, at a MeasurEtd Depth of 10270.00ft., The Bottom Hole Displacement is 4531.93ft., in the Direction of 127.382° (True). 19 August, 2002 - 9:42 Page 60t7 Dril/Quest 2.00.08.005 BP EXPLORATION (ALASKA) INC. Milne Point Unit Comments "-- Measured Depth (ft) Station Coordinates TVD Northings Eastings ~ ~ ~ Comment 10270.00 4248.09 2751.47 S Survey tool program for MPS-03 Sperry-Sun Drilling Services Survey Report for MPS-03 Your Ref: API 500292310500 Job No. AKZZ22127, Surveyed: 4 August, 2002 3601.09 E Projected Survey From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 177.00 0.00 177.00 176.99 10270.00 176.99 Tolerable Gyro 4248.09 AK-6 BP _IFR-AK 19 August, 2002 - 9:42 Page 70f7 . .þr\~. :.; ~"~ /. '..~ / t..~. . ¿i, /í~ II if {' ... BPXA 1/')'" Milne Point MPS IÞ¡¡ -. DrillQllest 2.00.08.005 (' AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 ~Od')'-/ (0 26-Aug-02 Re: Distribution of Survey Data for Well MPS-03 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 'MD , M D (if applicable) 10,270.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) REceiVED AUG 27 200L Alaska Oi'¡ & Gas Cons. Commission Anchorage BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA Milne Point MPS, Slot MPS-03 MPS-03 MWD Job No. AKMW22127, Surveyed: 4 August, 2002 SURVEY REPORT 19 August, 2002 Your Ref: API 500292310500 Surface Coordinates: 6000037.00 N, 566047.74 E (70024' 37.9348" N, 149027' 43.8689" W) Kelly Bushing: 66.20ft above Mean Sea Level !lpII""Y-IIUI1 bAIL.LING seAVu:es A Halliburton Company Survey Ref: 5vy10166 Sperry-Sun Drilling Services . Survey Report for MPS-03 MWD Your Ref: API 500292310500 Job No. AKMW22127, Surveyed: 4 August, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inet. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (° 11 OOft) 0.00 0.000 0.000 -66.20 0.00 O.OON O.OOE 6000037.00 N 566047.74 E 0.00 Tolerable Gyro 177.00 0.800 302.000 110.79 176.99 0.65N 1.05W 6000037.65 N 566046.69 E 0.452 -1.23 MWD Magnetic 296.89 0.350 11.740 230.68 296.88 1.46 N 1.68W 6000038.44 N 566046.04 E 0.629 -2.22 386.03 1.700 53.400 319.80 386.00 2.51 N 0.57W 6000039.51 N 566047.15 E 1.635 -1.98 475.36 4.350 48.120 409.00 475.20 5.56N 3.02E 6000042.59 N 566050.71 E 2.980 -0.99 564.01 7.610 50.140 497.16 563.36 11.57 N 10.03 E 6000048.66 N 566057.67 E 3.684 0.91 654.06 12.640 52.310 585.78 651.98 21.42 N 22.41 E 6000058.62 N 566069.96 E 5.601 4.73 749.43 13.880 54.470 678.60 744.80 34.45 N 39.98 E 6000071.80 N 566087.41 E 1 .400 10.72 840.17 15.950 54.720 766.28 832.48 47.98 N 59.02 E 6000085.50 N 566106.33 E 2.282 17.58 937.24 18.070 49.950 859.10 925.30 65.37 N 81.43 E 6000103.09 N 566128.59 E 2.613 24.77 1028.10 18.670 52.510 945.33 1011.53 83.29 N 103.76 E 6000121.21 N 566150.76 E 1.106 31.56 1124.49 18.620 55.320 1036.67 1102.87 101.44 N 128.66 E 6000139.57 N 566175.49 E 0.933 40.25 1217.42 20.660 54.330 1124.19 1190.39 119.44 N 154.18 E 6000157.80 N 566200.85 E 2.224 49.53 1310.76 24.350 48.720 1210.41 1276.61 141.75 N 182.03 E 6000180.35 N 566228.51 E 4.570 58.03 1404.51 28.810 44.610 1294.24 1360.44 170.60 N 212.43 E 6000209.47 N 566258.66 E 5.143 64.57 1498.15 31 .660 45.450 1375.14 1441.34 203.91 N 245.80 E 6000243.07 N 566291.73 E 3.077 70.75 1591.20 31.050 46.450 1454.60 1520.80 237.57 N 280.59 E 6000277.04 N 566326.22 E 0.862 77.84 1684.56 32.790 49.710 1533.84 1600.04 270.51 N 317.33 E 6000310.31 N 566362.67 E 2.623 86.91 1774.32 31 .900 49.430 1609.67 1675.87 301.65 N 353.89 E 6000341.77 N 566398.95 E 1.005 96.93 .- 1871.59 31.770 51.060 1692.31 1758.51 334.46 N 393.33 E 6000374.93 N 566438.10 E 0.894 108.23 1964.73 34.390 51.920 1770.35 1836.55 366.10 N 433.11 E 6000406.92 N 566477.60 E 2.858 120.51 2058.12 40.320 53.060 1844.55 1910.75 400.56 N 478.06 E 6000441.77 N 566522.24 E 6.393 135.17 2151.71 45.760 53.640 1912.93 1979.13 438.66 N 529.30 E 6000480.32 N 566573.14 E 5.828 152.60 2244.60 46.230 54.860 1977.46 2043.66 477.69 N 583.53 E 6000519.84 N 566627.02 E 1.072 171.83 2337.63 48.950 55.120 2040.20 2106.40 517.09 N 639.78 E 6000559.73 N 566682.92 E 2.931 192.45 2431.21 53.070 54.150 2099.07 2165.27 559.20 N 699.07 E 6000602.36 N 566741.84 E 4.476 213.83 2524.33 58.040 53.540 2151.72 2217.92 604.50 N 761.05 E 6000648.20 N 566803.41 E 5.364 235.39 2619.52 62.720 53.980 2198.76 2264.96 653.40 N 827.78 E 6000697.69 N 566869.71 E 4.933 258.53 2713.14 63.820 54.970 2240.86 2307.06 701.98 N 895.83 E 6000746.87 N 566937.32 E 1.507 282.91 2806.80 66.870 54.300 2279.93 2346.1 3 751.24 N 965.23 E 6000796.75 N 567006.29 E 3.321 307.94 19 August, 2002 - 9:46 Page 20'7 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services . .. Survey Report for MPS-03 MWD Your Ref: API 500292310500 Job No. AKMW22127, Surveyed: 4 August, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inct. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) r/1 OOft) 2900.80 68.100 53.970 2315.93 2382.13 802.12 N 1035.60 E 6000848.25 N 567076.21 E 1.348 332.77 2994.33 68.940 54.710 2350.17 2416.37 852.86 N 1106.31 E 6000899.61 N 567146.47 E 1.161 357.95 3087.77 69.940 54.900 2382.99 2449.19 903.28 N 1177.81 E 6000950.66 N 567217.51 E 1.087 383.94 3180.47 70.420 55.920 2414.42 2480.62 952.79 N 1249.60 E 6001000.80 N 567288.87 E 1.157 410.72 3273.15 71.040 55.280 2445.01 2511.21 1002.21 N 1321.79 E 6001050.86 N 567360.61 E 0.934 437.86 3366.75 71.600 55.190 2474.99 2541.19 1052.77 N 1394.63 E 6001102.07 N 567433.00 E 0.605 464.84 3459.35 71.440 54.600 2504.34 2570.54 1103.28 N 1466.48 E 6001153.20 N 567504.40 E 0.629 491.06 3550.18 71.280 56.080 2533.37 2599.57 1152.22 N 1537.27 E 6001202.77 N 567574.76 E 1.554 517.39 3643.66 71.410 56.030 2563.27 2629.4 7 1201.68 N 1610.74 E 6001252.88 N 567647.79 E 0.148 545.54 3737.17 71 .850 56.550 2592.74 2658.94 1250.93 N 1684.56 E 6001302.78 N 567721.18 E 0.707 574.09 3830.91 73.250 56.270 2620.85 2687.05 1300.41 N 1759.05 E 6001352.91 N 567795.23 E 1.520 603.03 3924.90 70.770 58.280 2649.88 2716.08 1348.74 N 1834.24 E 6001401.90 N 567869.98 E 3.331 633.23 4018.26 71.200 59.100 2680.30 2746.50 1394.60 N 1909.65 E 6001448.44 N 567944.99 E 0.950 665.10 4111.02 69.680 60.200 2711.35 2777.55 1438.77 N 1985.08 E 6001493.27 N 568020.02 E 1.983 698.02 4204.55 67.830 60.070 2745.24 2811.44 1482.18 N 2060.67 E 6001537.34 N 568095.22 E 1.982 731.53 4297.51 67.080 61.100 2780.89 2847.09 1524.34 N 2135.46 E 6001580.17 N 568169.63 E 1.303 765.16 4391.47 64.850 62.410 2819.15 2885.35 1564.96 N 2211.04 E 6001621.45 N 568244.86 E 2.693 800.37 4484.83 62.950 66.250 2860.24 2926.44 1601.29 N 2286.57 E 6001658.44 N 568320.06 E 4.217 838.14 4578.10 63.080 72.290 2902.59 2968.79 1630.68 N 2364.26 E 6001688.53 N 568397.48 E 5.772 881 .85 4671.47 61.230 78.270 2946.23 3012.43 1651.68 N 2444.04 E 6001710.23 N 568477.08 E 5.999 932.34 4764.35 59.610 82.440 2992.09 3058.29 1665.24 N 2523.64 E 6001724.49 N 568556.56 E 4.276 987.21 4856.89 58.270 88.300 3039.87 3106.07 1671.66 N 2602.60 E 6001731.61 N 568635.45 E 5.614 1045.92 4951.24 57.410 93.370 3090.11 3156.31 1670.51 N 2682.42 E 6001731.17 N 568715.28 E 4.639 1109.93 5044.96 57.110 95.480 3140.80 3207.00 1664.43 N 2761.01 E 6001725.78 N 568793.92 E 1.921 1175.96 5138.16 55.160 96.550 3192.74 3258.94 1656.33 N 2837.97 E 6001718.36 N 568870.95 E 2.299 1241 .93 5232.14 54.330 100.610 3247.00 3313.20 1644.90 N 2913.83 E 6001707.60 N 568946.91 E 3.636 1309.05 5325.14 53.750 106.990 3301.65 3367.85 1626.97 N 2986.87 E 6001690.32 N 569020.11 E 5.587 1377.90 5418.44 54.630 112.010 3356.26 3422.46 1601.71 N 3058.15 E 6001665.70 N 569091.61 E 4.464 1449.82 5511.41 54.570 115.310 3410.12 3476.32 1571.31 N 3127.55 E 6001635.91 N 569161.27 E 2.894 1523.38 5604.56 56.860 118.240 3462.60 3528.80 1536.62 N 3196.23 E 6001601.83 N 569230.26 E 3.577 1598.98 19 August, 2002 - 9:46 Page 3 of7 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-03 MWD Your Ref: API 500292310500 Job No. AKMW22127, Surveyed: 4 August, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inct. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 5699.03 57.270 119.940 3513.97 3580.17 1498.07 N 3265.51 E 6001563.89 N 569299.88 E 1.571 1677.40 5792.73 55.220 124.190 3566.04 3632.24 1456.76 N 3331.52 E 6001523.17 N 569366.25 E 4.359 1754.92 5886.12 55.150 127.750 3619.37 3685.57 1411.74 N 3393.56 E 6001478.70 N 569428.68 E 3.130 1831.54 5979.59 55.990 131.890 3672.24 3738.44 1362.38 N 3452.74 E 6001429.86 N 569488.30 E 3.762 1908.55 6072.23 58.770 136.350 3722.19 3788.39 1308.05 N 3508.70 E 6001376.03 N 569544.73 E 5.044 1986.01 6165.82 61.690 140.850 3768.67 3834.87 1247.11 N 3562.36 E 6001315.57 N 569598.93 E 5.210 2065.69 6258.65 60.830 145.840 3813.33 3879.53 1181.85 N 3610.94 E 6001250.74 N 569648.09 E 4.803 2143.97 6352.24 62.820 151.370 3857.54 3923.74 1111 .46 N 3653.86 E 6001180.72 N 569691.63 E 5.625 2220.89 6445.58 63.340 157.800 3899.84 3966.04 1036.34 N 3689.54 E 6001105.92 N 569727.97 E 6.167 2294.94 6539.27 64.420 164.830 3941.12 4007.32 956.71 N 3716.44 E 6001026.54 N 569755.58 E 6.834 2364.78 6632.85 65.650 170.850 3980.65 4046.85 873.83 N 3734.28 E 6000943.82 N 569774.15 E 5.978 2429.41 6726.51 65.280 174.540 4019.55 4085.75 789.34 N 3745.12 E 6000859.42 N 569785.73 E 3.606 2489.47 6819.15 65.640 177.350 4058.04 4124.24 705.29 N 3751.07 E 6000775.43 N 569792.43 E 2.786 2545.38 6913.12 69.230 179.340 4094.09 4160.29 618.57 N 3753.56 E 6000688.73 N 569795.68 E 4.292 2600.18 7005.61 74.090 179.370 4123.19 4189.39 530.80 N 3754.55 E 6000600.99 N 569797.44 E 5.255 2654.41 7099.62 79.860 179.980 4144.37 4210.57 439.25 N 3755.06 E 6000509.44 N 569798.77 E 6.170 2710.58 7193.29 84.830 182.340 4156.84 4223.04 346.47 N 3753.17 E 6000416.65 N 569797.70 E 5.864 2765.60 7251.22 84.460 180.470 4162.25 4228.45 288.82 N 3751.75 E 6000358.98 N 569796.79 E 3.277 2799.59 7347.63 86.920 181.060 4169.49 4235.69 192.70 N 3750.47 E 6000262.85 N 569796.36 E 2.624 2857.12 - 7392.15 86.430 179.940 4172.07 4238.27 148.25 N 3750.08 E 6000218.41 N 569796.36 E 2.742 2883.88 7440.71 86.190 178.330 4175.20 4241.40 99.80 N 3750.81 E 6000169.97 N 569797.52 E 3.345 2913.98 7485.46 86.120 178.370 4178.20 4244.40 55.17 N 3752.10 E 6000125.35 N 569799.20 E 0.180 2942.18 7533.38 86.680 178.670 4181.21 4247.41 7.36N 3753.33 E 6000077.55 N 569800.86 E 1.325 2972.28 7579.24 86.61 0 179.990 4183.89 4250.09 38.42 S 3753.87 E 6000031.78 N 569801.80 E 2.877 3000.59 7626.4 7 90.860 181.250 4184.94 4251.14 85.62 S 3753.36 E 5999984.58 N 569801.71 E 9.385 3028.93 7671.41 93.940 183.360 4183.05 4249.25 130.48 S 3751.55 E 5999939.70 N 569800.30 E 8.305 3054.82 7723.59 93.320 182.790 4179.75 4245.95 182.48 S 3748.76 E 5999887.68 N 569797.97 E 1.613 3084.28 7765.07 92.710 182.150 4177.57 4243.77 223.86 S 3746.98 E 5999846.28 N 569796.55 E 2.130 3108.07 7813.96 93.570 183.010 4174.89 4241.09 272.63 S 3744.78 E 5999797.50 N 569794.78 E 2.486 3136.03 7858.58 94.380 183.180 4171.80 4238.00 317.07 S 3742.38 E 5999753.03 N 569792.77 E 1.855 3161.20 19 August, 2002 - 9:46 Page 4 of7 DrillQllest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-03 MWD Your Ref: AP/500292310500 Job No. AKMW22127, Surveyed: 4 August, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 7908.86 90.120 184.190 4169.82 4236.02 367.20 S 3739.15 E 5999702.88 N 569789.99 E 8.707 3189. 17 7952.41 89.570 183.020 4169.94 4236.14 410.66 S 3736.41 E 5999659.40 N 569787.63 E 2.969 3213.47 .- 8000.74 90.180 182.350 4170.05 4236.25 458.94 S 3734.14 E 5999611.10 N 569785.80 E 1.875 3241.08 8045.63 91 .600 183.990 4169.35 4235.55 503.75 S 3731.66 E 5999566.27 N 569783.71 E 4.832 3266.41 8094.23 92.090 183.080 4167.79 4233.99 552.23 S 3728.67 E 5999517.76 N 569781.14 E 2.126 3293.56 8139.33 92.030 181.770 4166.16 4232.36 597.26 S 3726.76 E 5999472.72 N 569779.64 E 2.906 3319.48 8188.21 91.660 181.030 4164.59 4230.79 646.10 S 3725.57 E 5999423.87 N 569778.87 E 1.692 3348.28 8232.33 91.720 180.860 4163.29 4229.49 690.20 S 3724.84 E 5999379.77 N 569778.54 E 0.408 3374.56 8281.62 91.970 180.620 4161.70 4227.90 739.46 S 3724.20 E 5999330.51 N 569778.34 E 0.703 3404.06 8326.28 90.000 181.760 4160.93 4227.13 784.10 S 3723.28 E 5999285.86 N 569777.80 E 5.096 3430.51 8377 .33 89.750 181.240 4161.05 4227.25 835.13 S 3721.94 E 5999234.82 N 569776.92 E 1.130 3460.54 8419.78 89.750 184.720 4161.23 4227.43 877.52 S 3719.73 E 5999192.41 N 569775.09 E 8.198 3484.60 8467.92 90.740 185.520 4161.03 4227.23 925.46 S 3715.44 E 5999144.43 N 569771.22 E 2.644 3510.40 8512.48 90.980 185.780 4160.36 4226.56 969.80 S 3711.05 E 5999100.06 N 569767.22 E 0.794 3533.93 8561.95 90.860 185.040 4159.56 4225.76 1019.04 S 3706.39 E 5999050.77 N 569762.99 E 1.515 3560.22 8606.12 90.860 185.000 4158.90 4225.10 1063.04 S 3702.52 E 5999006.74 N 569759.52 E 0.091 3583.95 8653.46 91.600 183.780 4157.88 4224.08 1110.23 S 3698.90 E 5998959.53 N 569756.31 E 3.014 3609.82 8699.50 91.720 183.260 4156.55 4222.75 1156.16 S 3696.07 E 5998913.57 N 569753.89 E 1.159 3635.56 8747.88 92.280 182.910 4154.86 4221.06 1204.44 S 3693.47 E 5998865.27 N 569751.72 E 1.365 3662.90 ~. 8792.80 92.340 182.590 4153.05 4219.25 1249.27 S 3691.32 E 5998820.42 N 569749.96 E 0.724 3688.50 8842.61 90.980 184.800 4151.61 4217.81 1298.95 S 3688.11 E 5998770.71 N 569747.19 E 5.208 3716.22 8886.23 90.550 184.440 4151.03 4217.23 1342.43 S 3684.60 E 5998727.21 N 569744.06 E 1.286 3739.91 8935.42 90.550 183.830 4150.55 4216.75 1391.49 S 3681.05 E 5998678.12 N 569740.95 E 1.240 3766.98 8980.08 90.490 183.280 4150.15 4216.35 14~16.06 S 3678.28 E 5998633.52 N 569738.58 E 1.239 3791.93 9028.92 90.490 182.770 4149.73 4215.93 1484.83 S 3675.70 E 5998584.73 N 569736.43 E 1.044 3819.59 9072.91 90.430 181.960 4149.38 4215.58 1528.78 S 3673.89 E 5998540.77 N 569735.00 E 1.846 3844.93 9121.25 90.370 181.970 4149.04 4215.24 1517.09 S 3672.23 E 5998492.44 N 569733.77 E 0.126 3873.04 9167.33 90.920 181.810 4148.52 4214.72 1623.14 S 3670.71 E 5998446.38 N 569732.66 E 1.243 3899.88 9215.38 92.590 183.160 4147.05 4213.25 1671.12 S 3668.63 E 5998398.38 N 569731.00 E 4.468 3927.45 9260.64 93.080 184.360 4144.81 4211.01 1716.23 S 3665.66 E 5998353.25 N 569728.44 E 2.861 3952.58 19 August, 2002 - 9:46 Page 50f7 DríflQuest 2.00.08.005 Sperry-Sun Drilling Services . Survey Report for MPS-03 MWD Your Ref: AP/500292310500 Job No. AKMW22127, Surveyed: 4 August, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Milne Point MPS Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9309.91 93.200 183.720 4142.11 4208.31 1765.30 S 3662.20 E 5998304.15 N 569725.41 E 1.320 3979.72 9353.82 89.630 185.510 4141.03 4207.23 1809.05 S 3658.67 E 5998260.38 N 569722.26 E 9.094 4003.56 9404.56 86.920 184.790 4142.55 4208.75 1859.56 S 3654.11 E 5998209.83 N 569718.16 E 5.526 4030.72 9446.99 85.200 184.900 4145.47 4211.67 1901.73 S 3650.54 E 5998167.62 N 569714.95 E 4.062 4053.57 9496.76 85.200 184.780 4149.63 4215.83 1951.15 S 3646.36 E 5998118.17 N 569711.21 E 0.240 4080.35 9540.84 88.770 185.400 4151.95 4218.15 1994.99 S 3642.45 E 5998074.30 N 569707.69 E 8.220 4103.96 9588.68 88.710 184.950 4153.00 4219.20 2042.62 S 3638.14 E 5998026.63 N 569703.80 E 0.949 4129.55 9634.01 87.230 184.420 4154.61 4220.81 2087.77 S 3634.44 E 5997981.45 N 569700.50 E 3.468 4154.11 9681.76 87.110 184.100 4156.97 4223.17 2135.33 S 3630.89 E 5997933.86 N 569697.37 E 0.715 4180.27 9727.21 82.100 182.940 4161.24 4227.44 2180.48 S 3628.11 E 5997888.69 N 569694.99 E 11.312 4205.57 9777.33 81.910 182.490 4168.21 4234.41 2230.06 S 3625.76 E 5997839.09 N 569693.08 E 0.967 4233.90 9820.87 77.840 183.650 4175.86 4242.06 2272.85 S 3623.47 E 5997796.29 N 569691.17 E 9.709 4258.15 9871 .11 78.360 184.220 4186.22 4252.42 2321.89 S 3620.10 E 5997747.21 N 569688.23 E 1.518 4285.34 9914.15 83.400 185.910 4193.04 4259.24 2364.21 S 3616.34 E 5997704.87 N 569684.85 E 12.335 4308.14 9962.89 89.260 187.470 4196.16 4262.36 2412.49 S 3610.68 E 5997656.53 N 569679.61 E 12.440 4333.05 10007.26 95.670 189.440 4194.26 4260.46 2456.31 S 3604.16 E 5997612.65 N 569673.48 E 15.112 4354.58 10058.05 95.920 189.970 4189.13 4255.33 2506.12 S 3595.65 E 5997562.77 N 569665.41 E 1.149 4378.16 10100.87 91.910 188.420 4186.20 4252.40 2548.28 S 3588.82 E 5997520.55 N 569658.96 E 10.037 4398.43 1 0151 .33 88.950 187.830 4185.83 4252.03 2598.23 S 3581.69 E 5997470.55 N 569652.27 E 5.981 4423.20 10202.49 92.710 187.620 4185.08 4251.28 2648.91 S 3574.82 E 5997419.81 N 569645.84 E 7.361 4448.62 10270.00 92.710 187.620 4181.89 4248.09 2715.75 S 3565.87 E 5997352.89 N 569637.49 E 0.000 4482.23 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 127.524° (True). Based upon Minimum Curvature type calculations, at a MeasurE~d Depth of 10270.00ft., The Bottom Hole Displacement is 4482.27ft., in the Direction of 127.293° (True). ---------~-~------ 19 August, 2002 - 9:46 Page 60f7 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Report for MPS-03 MWD Your Ref: API 500292310500 Job No. AKMW22127, Surveyed: 4 August, 2002 . BP EXPLORATION (ALASKA) INC. Milne Point Unit BPXA Milne Point MPS Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 10270.00 4248.09 2715.75 S 3565.87 E Projected Survey Survey tool program for MPS-03 MWD From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 177.00 0.00 177.00 176.99 10270.00 176.99 Tolerable Gyro 4248.09 MWD Magnetic ------ -- ------..-- 19 August, 2002 - 9:46 Page 70f7 DrillQlIest 2.00.08.005 Scblumbepgep Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth '-- Well W-20 J ~~.. 0 '-J Ie, E-31A 7JO:7i N-11 B I q -I 0 - PSI-06 . ~~ 0 a. "'/ t./ ç; ~.,- BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job# 22388 RST -SIGMA MPROD PROFILE MPROD PROFILE SBHP SURVEY Log Description Date 08/12/02 08/08/02 08/06/02 08/21/02 RECEIVED AUG~A 2002 Alaska Oii & Gas Cons. Commission Anchorage Blueline NO. 2365 Company: 08/28/02 State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Sepia Color Prints Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TIN: Beth Received & CD ~) .I @~fS\~c T~c fS\: @@!l% æ) ~~.J 1: ~ J Lr~~¿~~J~~~ AI'(~SIiA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. ]'TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Milne Point Unit MPS-03 BP Exploration (Alaska), Inc. Permit No: 202-146 Surface Location: 3367' NSL, 4743' WEL, Sec. 07, T12N, RIlE, UM Bottomhole Location: 611' NSL, 1167', WEL, Sec. 07, T12N, RIlE, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above development well. The permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, . &~ 04LY(. ~fr/ cam~chsli Tayíorð-~ Chair BY ORDER OF THE COMMISSION DATED thisH day of July, 2002 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. 1 a. Type of work II Drill [] Redrill [] Re-Entry [] Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3367' NSL, 4743' WEL, SEC. 07, T12N, R11 E UM (As Staked) At top of productive interval ' 4043' NSL, 1029' WEL, SEC. 07, T12N, 'R11 E, UM (OB) At total depth 611' NSL, 1167' WEL, SEC. 07, T12N, R11E, UM (OB) 12. Distance to nearest property line 13. Distance to nearest well / ADL 047446, 611' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 366' MD Maximum Hole Angle 18. Casin~ Program Specifications 517e Hole C::Isino WeiQ~t Gr~d~ Cou.pIif1Q 42" 20" 92# H-40 Welded 9-7/8" 7-5/8" 29.7# L-80 BTC 6-1/8" 4-1/2" 12.7# L-80 BTC ALASKA l.- AND ~~;~g:S~~~~ON COMMt~~ION PERMIT TO DRILL 20 MC 25.005 1 b. Type of well [] Exploratory [] Stratigraphic Test II Development Oil [] Service [] Development Gas [] Single Zone [] Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE = 68' Milne Point Unit / Schrader 6. Property Designation Bluff ADL 380110 7. Unit or Property Name Milne Point Unit 8. Well Number / MPS-03 9. Approximate spud date 07/23/02 ./ Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 104631 MD / 4261' TVD 17. Anticipated pressure {sr 20 AAC 25.035 (e) (2)} 94 0 Maximum surface 1496 psig, At total depth (TVD) 4278' / 1924 psig Setting Depth TOp Ro,.om Mn TVI') t.ðn TVO 301 301 112' 1121 30' 301 70161 4277' 6916' 4227' 104631 4261' \lJ'G.A- ï/II{O L ~ 7f1l /Û7J2- 11. Type Bond (See 20 MC 25.025) Number 2S 100302630-277 ~ e(1oth 821 7016' 3547' Ouantit,y of Cement (include ~ta.Qe data) ~60 sx Arctic Set (Approx.) 639 sx PF "L', 281 Class 'G1 Uncemented Slotted Liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical feet feet feet feet Junk (measured) Plugs (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD REC:EI\fED JUL -I 0 2002 Perforation depth: measured Alâska Oil & Gas Gons. lionumSSlon , - Anchorage true vertical 20. Attachments II Filing Fee [] Property Plat II Drilling Fluid Program [] Time vs Depth Plot Contact Engineer Name/Number: Steve Campbell, 564-4401 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Pat Archey -3 l.. Title Senior Drilling Engineer [J BOP Sketch (J Diverter Sketch II Drilling Program (J Refraction Analysis [] Seabed. Report [] 20 AAC 25.050 Requirements Prepared By Name/Number: Sandra Stewman, 564-4750 Permit Number API Number ::z~? -/yC 50- oz.~- Z3/dS Conditions of Approval: Samples Required 0 Yes BI No Hydrogen Sulfide Measures 0 Yes ßZI No Required Working Pressure for BOPE 0 2K 0 3K Other: Tes f Boft:: Þ t/a:r/ p1tt'. Approved By Ongmal Slgn~ By ~ G'õmin~slOJ]i\r J Form 10-401 Rev. 12-01-85 C'ctmmy 0dcl1::»1i Tö~ I CJ i ii \J i=~\ ~ A8f.r()va.1 D~e See cover letter .~ 1 ,~ 1J :;.... for other reQuirements Mud Log FreqLired 0 Yes 1&1 No Directional Survey Required lEI Yes 0 No 04K D5K D10K D15K 0 3.5K psi for CTU Date 1ij¡¡ bJ- 7,~mi~Ln Triplicate by order of the commission ( IWell Name: I MPS-03 Drill and Complete Plan Summary Milne Po( 'npS-03 Well Permit I Type of Well (service / producer / injector): 1 Multi Lateral Producer "OA" & "DB" 19111 FNL, (33671 FSL), 4743' FEL, (381 FWL), SEC. 7, T12N, R11E E=566047.81 N=6000037.19 10491 FNL, (42291 FSL), 1083' FEL, (36931 FWL), SEC. 7, T12N, R11 E E=569695.71 N=6000932.69 Z=4222' TVD 4668' FNL, (611' FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E E=569659.00 N=5997314.00 Z=4201' TVD 1236' FNL, (40431 FSL), 1029' FEL, (37481 FWL), SEC. 7, T12N, R11 E E=569752.04 N=6000746.67 Z=4278' TVD 46681 FNL, (611' FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E E=569659.00 N=5997314.00 Z=4261' TVD 46681 FNL, (611' FSL), 1167' FEL, (36241 FWL), SEC. 7, T12N, R11 E E=569659.00 N=5997314.00 Z=4261' TVD I AFE Number: I I Ria: I Doyon 141 /' 1 / 1 Estimated Start Date: 123 Jul 2002 / I I Operatina days to complete: 113 /' I I MD: 110463 1 1 TVD: 14261 I I Max Inc: 194 1 I KOP: 1366 1 1 KBE: 1681 I Well Desian (conventional, slim hole, etc.): I Conventional Grass Roots ML Producer 1 1 Surface Location: Target Location: TOP "OA" Target Location: BHL "OA" Well TD Target Location: TOP "OB" Target Location: BHL "OB" Well TD TOTAL DEPTH 1 Objective: 1 Schrader DB Sand Mud Program: 9-7/8" Surface Hole Mud Properties: Density (ppg) Funnel visc YP j 8.6 - 9.20 J HTHP Spud - LSND Freshwater Mud pH API Filtrate LG Solids < 6.5 75 - 150 N/A <8 25 - 60 9.0-9.5 6-1/8" Production Hole Mud Properties: KCL-CaC03 Flow Pro Density (ppg) Funnel visc YP HTHP pH API Filtrate LG Solids 8.6 - 9.20 ¡ 40 55 22 - 27 <10 8.0 - 8.5 4 - 6 < 12 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU IR. 1 ( Milne PO~ 'JIPS-03 Well Permit Cement Program: Casing Size 17.625-in 29.7-lb/ft L-80 BTC Intermediate Casing B . 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below aSlS permafrost Pump lead to surface before switching to tail. Have additional 300-sx lead cement on location. Total Cement Volume: 772-bbl Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg 50 bbl of Viscosified Spacer (Alpha Design) weighted to 10.50 Spacer ppg / Lead 639 s~ 10.7Ib/gal Class L - 4.15 cuft/sx (cement to surface) 281-~x 15.8Ib/gal Prem G - 1.15 cuft/sx (top of tail at 5938' Tail Temp BHST ~ 80° F from SOR, BHCT 85° F estimated by Halliburton Evaluation Program: 9 7/8" Hole Section: Open Hole: Cased Hole: 6-1/8" Hole section: Open Hole: MWD/GRlRES IFRlCASANDRA N/a MWD/GRlRES ABI/IFRlCASANDRA Formation Markers: Formation Tops MDrkb TVD~b . Estimated EMW (ft) (ft) Pore Pressure (pSI) (lb/gal)* Base Permafrost 1,936 1,816 816 8.65 Top Ugnu 5441 3,491 1570 8.65 Top Ugnu M NA Bottom U gnu NA NA 6438 4048 1820 8.65 NB 6507 4113 1850 8.65 NC 6577 4139 1861 8.65 NE 6613 4152 1867 8.65 NF 6739 4195 1886 8.65 / Top OA 6818 4222 1899 8.65 Base OA 6910 4250 1911 8.65 Top OB 7021 4278 1924 8.65 TD 10463 4261 1916 8.65 2 (I CaSing/T~bing prog;am: Milne Po~' 'IIPS-03 Well Permit Hole Csg/ Wt/Ft Grade Conn Length Top Bottom Size Tbg O.D. MD / TVDrkb MD / TVDrkb 42-in 20- in * 92# H-40 Welded 80-ft 30-ft 112-ft / 112-ft 9.875-in 7.625-in 29.7# L-80 BTC 7016-ft O-ft 7,016- ft / 4,277-ft 6.125-in 4.5-in 12.7# L-80 BTC 3,672-ft 6,778-ft / 4,208-ft 10,450-ft / 4,201-ft 6. 125-in 4.5-in 12.7# L-80 BTC 3,547-ft 6916-ft /4,227-ft 10,463-ft / 4,261-ft *The 20" casing is insulated Recommended Bit Program: BHA Hole Depth (MD) Bit Type Nozzle/Flow Size rate 1 9.875-in 0 - 2,000-ft Hughes MXC-l 3-15 & 1-10 2 9.875-in 2,000 - 7,016-ft Security Rotary TBD Steerable Bit 3 6.125-in 7,016-ft - TD Security FM2643 3 -12 Well Control: / . Production hole will be drilled with a diverter. Surface Interval . Maximum anticipated BHP: . Maximum surface pressure: 1924 psi ~ 4278' TVDrkb - Top of "OB" 1496 psi @ surface (Based on BHP and a full column of gas from TD @ 0.1 psi/ft) Diverter will be function tested. BOP's:T est annular 250,psi low and 2500 psi high, and rams to 250 psi low and 4,OOO1>si high. N/A 9.2 ppg NaCI / 6.8 ppg Diesel . Planned BOP test pressure: . . Kick tolerance: . Planned completion fluid: Drilling Hazards & Contingencies: Hydrates . Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud «60 deg F); Limit 3 ( Milne Po~' ~PS-03 Well Permit ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. . Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation . We do not expect losses while drilling this well. . Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures . It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. Pad Data Sheet . Please Read the S-Pad Data Sheet thoroughly. Breathing . N/A Hydrocarbons . Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults . NA Hydrogen Sulfide . MPS Pad is not designated as an H2S Pad. Anti-collision Issues . MPS-03 has no anti-collision issues. 4 ( .DRILL & COMPLETION PROCEDURE Milne po~. 'npS-03 Well Permit Pre- Rig Operations 1. The 20" insulated conductor is installed Procedure I í7 1. MIRU, NU diverter on 20" conductor and function test, PU(fJ/drill pipe 2. Drill 9-7/8" surface hole as per directional plan. 3. Condition mud prior to 7 5/8" casing run. POOH 4. Run and cement 7 5/8" casing from TD to surface. / 5. ND Diverter 6. Install FMC 11" 5m horizontal wellhead 7. N/U and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams to 250 low and 4000 psi high /" 8. Drill 6-118" OB horizontal production hole as per directional plan. 9. Run 4-112" slotted liner and hang off 100' inside 7-5/8" casing. ~ 10. Make up Baker Window Master milling assembly with bottom trip anchor and MWD. a. RIH. Orient and set whipstock to place window at top of the OA interval. b. Shear off and mill window thru 7-5/8" casing. 11. Drill 6-118" OA lateral geosteering and short tripping as required. Maintain FloPro mud properties and POOH. 12. MU whipstock retrieving tool and pull whipstock 13. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7-5/8" casing 14. POOH 15. Till and displace out drilling mud with 9.2 ppg NaCl 16. POOH 17. Run in hole with 4-112" jet pump completion as per schematic 18. Land tubing hanger and test 19. Set BPV 20. ND BOP 21. Install and test tree 22. Pull BPV 23. Drop ball and set production packer / 24. Test 7-5/8" x 4-112" annulus and packer to 3500 psi 25. Freeze protect thru GLM 26. Install BPV and secure the well 27. RD/MO 5 (. ( BP EXPLORATION Milne Point Unit MPS-03 & MPS-03 L 1 Field: Milne Point Well: MPS-03 DIRECTIONAL OPEN HOLE FORMATION DEPTH LWD LOGGING MD I TVD TOC NONE NONE 112' 112' Top of Lead Cement Surf Surf Dir/GR/RES NONE Base of Permafrost 1,936' 1,816' Top of Tail Cement 5,938' 3873 Top of N sand 6,438' 4,086' - - ö~/~s . - . . - . . - . . - . . - . . - . . - . . - . . - . . - --. ABI/GR NONE OA sand 6,818' 4,222' - -.. -. .-.. -.. - ..- .. -.. -.. -.. .22:.4~<r.. ~:.221'.. 7-518" Surface casing 7,016' 4,277' - - Õ~/Rã; . - . . - . . - . . - .. - . . - . . - . . - . . - . . - 8_. - ABI/GR NONE OB sand 7,021' 4,278' 10,463' 4,261' - --. -.. -.. -.. -.. - .. -.. -.. ---,_. --.. - 8_- -.. -.. 7/9/2002 ENG: Steve Campbell I Matthew Green RIG: Doyon 141 MSL 39.3-ft RKB: 68' HOLE CASING MUD INFO TOC SIZE SPECS PIT INFO INFORMATION Wellhead 20' 91.5# FMC Gen 6 20" xII. 5M H-40 Insulated N/A 42" Welded KOP @ 366' MD 6-1/8" Hole. 4-1/2",12.6#, L-80 Slotted Liner 9-7/8" Surface Casing 75/8" 29.7# L-80 BTC MW = 9.2 6-1/8" Hole - 4-1/2",12.6#, L-BO Slotted Liner MPS-03ML WBD.xls COMPANY DETAILS BP Amoco Calculation Method: Minimmn Curvature Error System: ISCWSA Scan Method: Trav Cylinder North EITor Surface: EUiptica1 + Casing WaminR Me1hod: Rules Based 0 -t-,--',-4 Start Dir 1.5/1 00' : 300' MD, 300'TVD ... : Start Dir 2.5/100' : 366.67' MD, 366.66'TVD 800 "/ Start Dir 1.5/100' : 1527.42' MD, 1473.33'TVD 1600 End Dir : 1860.75' MD, 1754.37' TVD - BPRF 35° Start Dir4/100': 2099.57' MD, 1950'TVD :s ~ 0 ~ -:3 c.. ~ 2400 i > 2 ¡.. End Dir : 2901.85' MD, 2447.83' TVD REFERENCE INFORMATION SURVEY PROGRAM Dep1h Fm Depth To SurveylPlan CB-GYRO.SS MWD+IFR+MS Co-ordinate (NlE) Reference: Wen Centre: Plan MpS-03, True Nor1h Vertical (TVD) Reference: Plan MpS-03 66.20 6620 Sectioo (VS) Refereoce: Slot - (O.ooN,O.ooE) Measured Depth Reference: Plan MPS-03 66.20 66.20 Calculation Method: Minim1.UJ1 CUIvatW'e Tool 27.60 loolJ.oo Planned: MpS-03 WpOl V5 1000.00 10463.60 Planned: MpS.03 WpOl V5 ./ Start Dir4/100' : 4177.6' MD, 2944.44'TVD 3200 4000 4800 - T I-'gnu SBF2-NA SBFI-NB SBE4-NC SBE2-NE SBEI-NF TSBD-OA TSBC TSBB-OB End Dir : 7175.91' MD,4293.72' TVD ',11111 -------- . -- ---..... .. - - --.' -- -._--- --- .-.--. - ..,..- --- ,--- -.-.----. -.-- \ i ; i I 1600 2400 Vertical Section at 127.530 [800ft/in] Name Plan MPS-03 +NI-S +FJ-W Nonh\Dß 61.83 -296.68 6000037.19 WELL DETAILS Easting Plan: MPS.(J3 WpOl (l'lan MI'S.(J3/Plan MPS.03) Created Dy: Ken Allen Dale: 7/8/2002 Checked: Dale: Reviewed: Date: Latitude h",gi\Ulic S~o\ Name TVP +N/-S ;66047.81 70024'37.937N 149°27'43.867W N/A Northing Eal'ting Shupe 569637.93 Point 56969 1.00 Poinl 569659.00 Poinl 569800.00 Poinl 569575.00 Polygon 569()19.00 Polygon 569393.00 Polygon 569750.98 Poinl 569710.00 Point T ogepi PUMP Togepi T4 T ogepi T5 T ogepi T2 MPS-03 Fault2 Togepi Poly MPS-03 Fault! Togepi TIa Togepi T3 4162.20 OI8.90 3599.61 4260.20 .2247.53 3623.80 426120 -275528 3587.31 4266.20 .815.42 3745.48 4266.20 -196.39 3525.93 4266.20 81527 3578.88 4266.20 .2055.89 3327.46 427720 680.99 3709.69 427820 .1917.68 3645.72 SECTION DETAILS Sec MD Inc Azi TVD +N/-S 1 27.60 0.00 0.00 27.60 0.00 2 300.00 0.00 0.00 300.00 0.00 3 366.67 1.00 40.00 366.66 0.45 4 1527.42 30.00 50.94 1473.33 195.24 5 1860.75 35.00 50.94 1754.37 308.06 6 2099.57 35.00 50.94 1950.00 394.38 7 2901.85 67.09 50.94 2447.83 782.38 8 4177.60 67.09 50.94 2944.44 1522.83 9 6642.53 70.00 160.00 4162.20 1018.90 10 6788.72 70.00 160.00 4212.20 889.81 II 70 I 6.59 76.86 166.26 4277.20 680.99 12 7175.91 91.25 178.96 4293.72 524.55 13 8357.38 91.25 178.96 4267.94 -656.45 14 8516.55 90.00 185.20 4266.20 -815.42 15 8532.48 89.36 185.20 4266.29 -831.28 16 9584. I 0 89.36 185.20 4277.98 -1878.51 17 9623.39 90.00 183.76 4278.20 -1917.68 18 9726.78 94.14 183.76 4274.47 -2020.76 19 9875.65 94.14 183.76 4263.73 -2168.93 20 9954.54 91.00 184.11 4260.20 -2247.53 21 9993.08 89.84 184. I I 4259.92 -2285.98 22 10463.60 89.84 184.11 4261.20 -2755.28 CASING DETAILS No. TVD MD Name Size 4277.20 70 I 6.59 75/8" 7.625 4261.20 10463.59 4112 4.500 Start Dir4/100': 9584.1' MD,4277.98'TVD ~End Dir : 9726.78' MD, 4274.47' TVD Start Dir4/100': 9875.65' MD, 4263.73'TVD Start Dir 3/100' : 9954.54' MD, 4260.2'TVD End Dir : 9993.08' MD, 4259.92' TVD . ~:., t~~~." ""''', 10463.6' MD. 4261.2' TVD .: [0000 4 1/2 x- ¡~~*, MD. 42.66.29';TVD ~J57.38' MD,4267¡94't\rD TARGET DETAILS 'FJ.W 6001087.78 5997822.()() 5997314.()() 5999255.()() 5999872.()() 6OOO884.()() 59980 I 1.00 6000750.89 59981 52.()() +E/-W DLeg TFace VSec Target 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ~~~ 0.37 1.50 40.00 0.03 237.30 2.50 11.28 69.27 376.32 1.50 0.00 110.80 482.69 0.00 0.00 142.58 960.83 4.00 0.00 285.43 1873.33 0.00 0.00 558.08 3599.61 4.00 116.07 2234.11 Togepi PUMP 3646.59 0.00 0.00 2350.00 ng~:~~ ~:gg 42.12 2527.24 42.12 2638.44 3751.25 0.00 0.00 3374.87 3745.48 4.00 101.28 3467.13 Togepi T2 3744.04 4.00 -179.72 3475.65 3648.79 0.00 0.00 4038.01 3645.72 4.00 -66.09 4059.43 Togepi T3 3638.95 4.00 0.00 4116.85 3629.2 I 0.00 0.00 4199.38 3623.80 4.00 173.61 4242.97 Togepi T4 3621. 04 3.00 180.00 4264.20 3587.31 0.00 0.00 4523.31 Togepi T5 FORMATION TOP DETAILS No. TVDPath MDPath Formation 1 1816.20 1"',..23 BPRF 2 3586.20 ,'~~ 1.04 TUgnu 3 4086.20 ,.~ 1'(.52 SBF2-NA 4 4113.20 (,.,..1.36 SBFI-NB 5 4139.20 r.' 7 '.20 SBE4-NC 6 4152.20 r.', '.67 SBE2-NE .-- 7 4195.20 (. 1 ~".02 SBEI-NF 8 4222.20 (,x I 10;.60 TSBD-OA 9 4250.20 ,..,111.52 TSBC 10 4278.20 '711~ 1.06 TSBB-OB All TVD depths are ssTVD plus 66.2'for RKBE. 4000 COMPANY DETAILS BP Amoco REFERENCE INFORMATION Ca1culatjon Method: Minimwn CWvature Error System: ISCWSA Scan Method: Tmv Cylinder Nnrth Error Surface: El1iptical + Casing WaminR Method: Rules Based Co-ordinate (NÆ) Reference: Wen Centre: Plan MPS'()3. True North Vertical (TVD) Reference: Plan MPS-03 66.20 66.20 Section (VS) Reference: Slot - (O.OON.O.OOE) Measured Depth Reference: Plan MPS.()3 66.20 66.20 Calculation Method: Minimmn Cwvature 2000- :g <t: 0 0 Ë +' ~ t:: ~ ~ :; 0 en SURVEY PROGRAM Plan: MPS-03 WpOI (I'lan MI'S-IHlI'lan MPS-03) Cr.,.aloo By: Ken AIle" Dale: 7/8/2002 Depth Fm Depth To SurveylPIan 27.60 1000,00 Planœd: MPS'()3 WpOI V5 1000.00 10463.60 Planned: MpS.()3 WpOI V5 Tool CB-GYRO.SS MWD+IFR+MS Checked: Dale: Reviewed: Date: ^pproveo: All TVD depths are ssTVD plus 66.2'for RKBE. ~~ Elld Dir : 6642.53' MD, 4162.2' TVD Start Dir 4/100' : 6788.72' MD, 42 I 2.2'TVD Start Dir 12/100': 7016.59' MD, 4277.2'TVD End Dir : 7175.91' MD, 4293.72' TVD Dir : 8532.48' MD. 4266.29' TVD CASING DETAILS No. TVD MD Name Size 4277.20 7016.59 75/8" 7.625 4261.20 10463.59 4112 4.500 FORMATION TOP DETAILS Start Dir 4/100' : 9584.1' MD, 4277.98'TVD No. TVDPath MDPath Formation End Dir : 9726.78' MD, 4274.47' TVD ] 1816.20 1936.23 BPRF Start Dir 4/1 00' : 9875.65' MD, 4263.73'TVD 2 3586.20 5441.04 TUgnu --------, .. J--- ----~:_---y 3 4086.20 6438.52 SBF2-NA Start Dir 3/100' : 9954.54' MD, 4260.2'TVD 4 4113.20 6507.36 SBFI-NB : 9993.08' MD, 4259.92' TVD 5 4139.20 6577.20 SBE4-NC 6 4152.20 6613.67 SBE2-NE 7 4195.20 6739.02 SBE I-NF 8 4222.20 6818.60 TSBD-OA Total Depth: 10463.6' MD, 4261.2' TVD 9 4250.20 6910.52 TSBC 10 4278.20 7021. 06 TSBB-OB .....-.-. '. SECTION DETAILS See MD Ine Azi TVD +N/-S +E/-W DLeg TFaee VSee Target I ~7.60 0.00 0.00 27.60 0.00 0.00 0.00 0.00 0.00 2 :111'.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 3 :..r..67 1.00 40.00 366.66 0.45 0.37 1.50 40.00 0.03 4 1 -: ,.42 30.00 50.94 1473.33 195.24 237.30 2.50 11.28 69.27 5 1"'''.75 35.00 50.94 1754.37 308.06 376.32 1.50 0.00 110.80 6 ::"."'.57 35.00 50.94 1950.00 394.38 482.69 0.00 0.00 142.58 7 ::.,,, 1.85 67.09 50.94 2447.83 782.38 960.83 4.00 0.00 285.43 8 .J I? 7.60 67.09 50.94 2944.44 1522.83 1873.33 0.00 0.00 558.08 9 I...J~.53 70.00 160.00 4162.20 1018.90 3599.61 4.00 116.07 2234.11 Togepi PUMP 10 1.7""'.72 70.00 160.00 4212.20 889.8] 3646.59 0.00 0.00 2350.00 II ',.'1 r..59 76.86 166.26 4277.20 680.99 3709.69 ~oo 42.12 2527.24 12 .717'.91 91.25 178.96 4293.72 524.55 3729.75 .00 42.12 2638.44 13 ¡;" 7.38 91.25 178.96 4267.94 -656.45 3751.25 0.00 0.00 3374.87 14 :; .[ r..55 90.00 185.20 4266.20 -815.42 3745.48 4.00 ] 0 1.28 3467.13 Togepi T2 ]5 :,.:.".48 89.36 185.20 4266.29 -831.28 3744.04 4.00 -179.72 3475.65 16 I"¡;¡'.IO 89.36 185.20 4277.98 -1878.51 3648.79 0.00 0.00 4038.01 17 '''': :.39 90.00 183.76 4278.20 -1917.68 3645.72 4.00 -66.09 4059.43 Togepi T3 18 ',' :r..78 94.14 183.76 4274.47 -2020.76 3638.95 4.00 0.00 4116.85 19 I"" '.65 94.14 183.76 4263.73 -2168.93 3629.21 0.00 0.00 4]99.38 20 I,." ¡..54 91.00 ]84.11 4260.20 -2247.53 3623.80 4.00 ]73.61 4242.97 Togepi T4 21 I,.,., :.08 89.84 184.] I 4259.92 -2285.98 3621.04 3.00 180.00 4264.20 22 I(JJ"i.60 89.84 184.11 4261.20 -2755.28 3587.31 0.00 0.00 4523.31 Togepi T5 -3000 I 4000 2000 West(-)/East(+) [IOOOft/in] TARGET DETAILS Name Easting Shape 569637.93 Point 569691.00 Point 569659.00 Point 569800.00 Point 569575.00 Polygon 569619.00 Polygon 569393.00 Polygon 569750.98 Point 569710.00 Point TVD +N/-S +FJ-W Northing T ogepi PUMP Togepi T4 T ogepi TS T ogepi T2 MpS-03 Fault2 T ogepi Poly MPS-03 Fault! T ogepi Tla T ogepi 13 4162.20 1018.90 3599.61 4260.20 -2247.53 3623.80 4261.20 -2755.28 3587.31 4266.20 -gI5.42 3745.48 4266.20 -196.39 3525.93 4266.20 815.27 3578.88 4266.20 -2055.89 3327.46 4277.20 680.99 3709.69 4278.20 -1917.68 3645.72 6001087.78 5997822.00 5997314.00 5999255.00 5999872.00 6000884.00 5998011.00 6000750.89 5998152.00 WELL DETAILS Name Easting Longitude Slot +N/-S Northing Latitude +FJ-W Plan MPS-03 61.83 -296.68 6000037.19 566047.81 70"24'37.937N 149"27'43.867W N/A BP My Planning Report MAP Company: Field: Site: Well: Wellpath: Field: BPAmoco Milne Point M Pt S Pad Plan MPS-03 Plan MPS-03 Date: 7/8/2002 TÎlne: 14:31 :38 Page: Cø7Ørdin~te(NEJReferen~e: Well: Plan MPS-03, True North Vertical (TVD) Reference: Plan MPS-03 66.20 66.2 Section (VS) Reference: Well (0.00N,0.00E,127.53Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Site: M Pt S Pad Site Position: From: Map Position Uncertainty: Ground Level: Northing: 5999978.00 ft Easting: 566345.00 ft Latitude: Longitude: North Reference: Grid Convergence: 70 24 37.329 N 149 27 35.171 W True 0.51 deg 0.00 ft 0.00 ft Well: Plan MPS-03 Slot Name: +N/-S 61.83 ft Northing: 6000037.19 ft +E/-W -296.68 ft Easting: 566047.81 ft Position Uncertainty: 0.00 ft Latitude: Longitude: 70 24 37.937 N 149 27 43.867 W Well Position: Wellpath: Plan MPS-03 +N/-S ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Well Ref. Point 0.00 ft Mean Sea Level 26.21 deg 80.79 deg Direction deg 127.53 Current Datum: Magnetic Data: Field Strength: Vertical Section: Plan MPS-03 66.20 6/29/2001 57481 nT Depth From (TVD) ft 0.00 MPS-03 Wp01 Height 66.20 ft Principal: Yes Date Composed: Version: Tied-to: 7/1/2002 5 From Well Ref. Point Plan: Casing Points MD TVD Diameter Hole Size Name ft ft in in 7016.59 4277.20 7.625 9.875 75/8" 1 0463.59 4261.20 4.500 6.125 4 1/2 Formations 1\'ID TVD Formations Lithology Dip Angle Dip Direction ft ft deg deg 1936.23 1816.20 BPRF 0.00 0.00 5441.04 3586.20 TUgnu 0.00 0.00 6438.52 4086.20 SBF2-NA 0.00 0.00 6507.36 4113.20 SBF1-NB 0.00 0.00 6577.20 4139.20 SBE4-NC 0.00 0.00 6613.67 4152.20 SBE2-NE 0.00 0.00 6739.02 4195.20 SBE1-NF 0.00 0.00 6818.60 4222.20 TSBD-OA 0.00 0.00 6910.52 4250.20 TSBC 0.00 0.00 7021.06 4278.20 TSBB-OB 0.00 0.00 Targets !\lap Map <--- Latitude ---> <-- Longitude --> Name Description TVD +N/-S +E/- W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft Togepi PUMP 4162.20 1018.90 3599.61 6001087.78 569637.93 70 24 47.949 N 149 25 58.345 W TogepiT4 4260.20 -2247.53 3623.80 5997822.00 569691.00 70 24 15.824 N 149 25 57.682 W TogepiT5 4261.20 -2755.28 3587.31 5997314.00 569659.00 70 24 10.831 N 149 25 58.758 W BP My Planning Report MAP ( Company: BPArnoco Field: Milne Point Site: M Pt S Pad Well: Plan MPS-03 Wellpath: Plan MPS-03 Targets Datë: .7/8/2002 Time: 14:3t:38 Page: Co-ø..d,nate(NE)Referen~e: Well;.PlanMPS-03.. True.. North Vertical (TVD) Reference: Plan MPS-03 66.20 66.2 Section (VS) Reference: Well (0.OON,O.00E,127.53Azi) Survey Calculation Method: Minimum Curvature Db: Oracle 2 Map Map <--- Latitude ~ <- Longitude -> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg MinSec Dip. Dir. ft ft ft ft ft TogepiT2 4266.20 -815.42 3745.48 5999255.00 569800.00 70 24 29.908 N 149 25 54.096 W MPS-03 F ault2 4266.20 -196.39 3525.93 5999872.00 569575.00 70 24 35.997 N 149 26 0.522 W -Polygon 1 4266.20 -196.39 3525.93 5999872.00 569575.00 70 24 35.997 N 149 26 0.522 W -Polygon 2 4266.20 1591.37 3466.73 6001659.00 569500.00 70 24 53.580 N 149 26 2.232 W Togepi Poly 4266.20 815.27 3578.88 6000884.00 569619.00 70 24 45.946 N 149 25 58.955 W -Polygon 1 4266.20 815.27 3578.88 6000884.00 569619.00 70 24 45.946 N 149 25 58.955 W -Polygon 2 4266.20 811.18 4040.91 6000884.00 570081.00 70 24 45.904 N 149 25 45.411 W -Polygon 3 4266.20 -2052.84 3887.56 5998019.00 569953.00 70 24 17.737 N 149 2549.950W -Polygon 4 4266.20 -2821.24 3807.75 5997250.00 569880.00 70 24 10.181 N 149 25 52.301 W -Polygon 5 4266.20 -2817.53 3387.73 5997250.00 569460.00 70 24 10.219 N 149 26 4.607 W -Polygon 6 4266.20 -2048.97 3449.54 5998019.00 569515.00 70 24 17.778 N 149 26 2.786 W MPS-03 Fault1 4266.20 -2055.89 3327.46 5998011.00 569393.00 70 24 17.710 N 149 26 6.363 W -Polygon 1 4266.20 -2055.89 3327.46 5998011.00 569393.00 70 24 17.710 N 149 26 6.363 W -Polygon 2 4266.20 -2171.72 4211.55 5997903.00 570278.00 70 24 16.567 N 149 25 40.459 W TogepiT1a 4277 .20 680.99 3709.69 6000750.89 569750.98 70 24 44.625 N 149 25 55.123 W TogepiT3 4278.20 -1917.68 3645.72 5998152.00 569710.00 70 24 19.068 N 149 25 57.035 W Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/10OO deg 27.60 0.00 0.00 27.60 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 366.67 1.00 40.00 366.66 0.45 0.37 1.50 1.50 0.00 40.00 1527.42 30.00 50.94 1473.33 195.24 237.30 2.50 2.50 0.94 11.28 1860.75 35.00 50.94 1754.37 308.06 376.32 1.50 .1.50 0.00 0.00 2099.57 35.00 50.94 1950.00 394.38 482.69 0.00 0.00 0.00 0.00 2901.85 67.09 50.94 2447.83 782.38 960.83 4.00 4.00 0.00 0.00 4177.60 67.09 50.94 2944.44 1522.83 1873.33 0.00 0.00 0.00 0.00 6642.53 70.00 160.00 4162.20 1018.90 3599.61 4.00 0.12 4.42 116.07 Togepi PUMP 6788.72 70.00 160.00 4212.20 889.81 3646.59 0.00 0.00 0.00 0.00 7016.59 76.86 166.26 4277.20 680.99 3709.69 4.00 3.01 2.75 42.12 7175.91 91.25 178.96 4293.72 524.55 3729.75 12.00 9.03 7.97 42.12 8357.38 91.25 178.96 4267.94 -656.45 3751.25 0.00 0.00 0.00 0.00 8516.55 90.00 185.20 4266.20 -815.42 3745.48 4.00 -0.79 3.92 101.28 TogepiT2 8532.48 89.36 185.20 4266.29 -831 .28 3744.04 4.00 -4.00 -0.02 -179.72 9584.10 89.36 185.20 4277.98 -1878.51 3648.79 0.00 0.00 0.00 0.00 9623.39 90.00 183.76 4278.20 -1917.68 3645.72 4.00 1.62 -3.66 -66.09 TogepiT3 9726.78 94.14 183.76 4274.47 -2020.76 3638.95 4.00 4.00 0.00 0.00 9875.65 94.14 183.76 4263.73 -2168.93 3629.21 0.00 0.00 0.00 0.00 9954.54 91.00 184.11 4260.20 -2247.53 3623.80 4.00 -3.98 0.45 173.61 TogepiT4 9993.08 89.84 184.11 4259.92 -2285.98 3621.04 3.00 -3.00 0.00 180.00 10463.60 89.84 184.11 4261.20 -2755.28 3587.31 0.00 0.00 0.00 0.00 TogepiT5 BP My Planning Report MAP Company: BPAmoco Date: 7/8/2002 Time: .t4:31 :38 Page: 3 Field: Milne Point Co-ordinate(NE) Ref~rence: Well: Plan MPS-03, True North Site: MPtSPad Vertical ([VD) Reference: Plan MPS-03 66.20 66.2 Well: Plan MPS..03 Section (VS) Reference: Well (0.00N,O.00E,127.53Azi) Wellpatb: Plan MPS..03 Survey Calculation Metbod: Minimûm Curvature Db: Oracle Survey Azim TVD Sys TVD MapN MapE VS DLS Tool/Comment ft deg deg ft ft ft ft ft deg/1 000 27.60 0.00 0.00 27.60 -38.60 6000037.19 566047.81 0.00 0.00 CB-GYRO-SS 100.00 0.00 0.00 100.00 33.80 6000037.19 566047.81 0.00 0.00 CB-GYRO-SS 200.00 0.00 0.00 200.00 133.80 6000037.19 566047.81 0.00 0.00 CB-GYRO-SS 300.00 0.00 0.00 300.00 233.80 6000037.19 566047.81 0.00 0.00 Start Dir 1.5/100' : 300' MD, 366.67 1.00 40.00 366.66 300.46 6000037.64 566048.18 0.03 1.50 Start Dir 2.5/100' : 366.67' M 400.00 1.82 45.13 399.99 333.79 6000038.24 566048.74 0.11 2.50 CB-GYRO-SS 500.00 4.32 48.69 499.83 433.63 6000041.88 566052.66 1.05 2.50 CB-GYRO-SS 600.00 6.82 49.64 599.36 533.16 6000048.28 566059.96 3.02 2.50 CB-GYRO-SS 700.00 9.32 50.09 698.36 632.16 6000057.41 566070.61 6.03 2.50 CB-GYRO-SS 800.00 11.82 50.34 796.65 730.45 6000069.26 566084.59 10.06 2.50 CB-GYRO-SS 900.00 14.32 50.51 894.06 827.86 6000083.81 566101.89 15.11 2.50 CB-GYRO-SS 1000.00 16.82 50.63 990.38 924.18 6000101.03 566122.46 21.17 2.50 MWD+IFR+MS 1100.00 19.31 50.72 1085.45 1019.25 6000120.89 566146.27 28.22 2.50 MWD+IFR+MS 1200.00 21.81 50.79 1179.07 1112.87 6000143.35 566173.28 36.26 2.50 MWD+IFR+MS 1300.00 24.31 50.85 1271.06 1204.86 6000168.36 566203.42 45.27 2.50 MWD+IFR+MS 1400.00 26.81 50.89 1361.27 1295.07 6000195.88 566236.65 55.23 2.50 MWD+IFR+MS 1500.00 29.31 50.93 1449.50 1383.30 6000225.86 566272.89 66.12 2.50 MWD+IFR+MS 1527.42 30.00 50.94 1473.33 1407.13 6000234.51 566283.35 69.27 2.50 Start Dir 1.5/100' : 1527.42' 1600.00 31.09 50.94 1535.84 1469.64 6000258.00 566311.78 77.82 1.50 MWD+IFR+MS 1700,00 32.59 50.94 1620.79 1554.59 6000291.60 566352.44 90.06 1.50 MWD+IFR+MS 1800.00 34.09 50.94 1704.33 1638.13 6000326.60 566394.81 102.81 1.50 MWD+IFR+MS 1860.75 35.00 50.94 1754.37 1688.17 6000348.54 566421.36 110.80 1.50 End Dir : 1860.75' MD, 1754.3 1900.00 35.00 50.94 1786.52 1720.32 6000362.88 566438.71 116.02 0.00 MWD+IFR+MS 1936.23 35.00 50.94 1816.20 1750.00 6000376.12 566454.73 120.84 0.00 BPRF 2000.00 35.00 50.94 1868.44 1802.24 6000399.41 566482.92 129.33 0.00 MWD+IFR+MS 2099.57 35.00 50.94 1950.00 1883.80 6000435.79 566526.95 142.58 0.00 Start Dir 4/100' : 2099.57' MD 2200.00 39.02 50.94 2030.18 1963.98 6000474.28 566573.53 156.60 4.00 MWD+IFR+MS 2300.00 43.02 50.94 2105.62 2039.42 6000516.07 566624.11 171.82 4.00 MWD+IFR+MS 2400.00 47.02 50.94 2176.29 2110.09 6000561.11 566678.62 188.22 4.00 MWD+IFR+MS 2500.00 51.02 50.94 2241.86 2175.66 6000609.18 566736.80 205.73 4.00 MWD+IFR+MS 2600.00 55.02 50.94 2302.01 2235.81 6000660.05 566798.36 224.26 4.00 MWD+IFR+MS 2700.00 59.02 50.94 2356.43 2290.23 6000713.46 566863.01 243.72 4.00 MWD+IFR+MS 2800.00 63.02 50.94 2404.88 2338.68 6000769.16 566930.42 264.01 4.00 MWD+IFR+MS 2901.85 67.09 50.94 2447.83 2381.63 6000827.96 567001.59 285.43 4.00 End Dir : 2901.85' MD, 2447.8 3000.00 67.09 50.94 2486.03 2419.83 6000885.55 567071.28 306.41 0.00 MWD+IFR+MS 3100.00 67.09 50.94 2524.96 2458.76 6000944.21 567142.29 327.78 0.00 MWD+IFR+MS 3200.00 67.09 50.94 2563.89 2497.69 6001002.88 567213.29 349.15 0.00 MWD+IFR+MS 3300.00 67.09 50.94 2602.81 2536.61 6001061.54 567284.30 370.53 0.00 MWD+IFR+MS 3400.00 67.09 50.94 2641.74 2575.54 6001120.20 567355.30 391.90 0.00 MWD+IFR+MS 3500.00 67.09 50.94 2680.67 2614.47 6001178.87 567426.30 413.27 0.00 MWD+IFR+MS 3600.00 67.09 50.94 2719.59 2653.39 6001237.53 567497.31 434.64 0.00 MWD+IFR+MS 3700.00 67.09 50.94 2758.52 2692.32 6001296.20 567568.31 456.01 0.00 MWD+IFR+MS 3800.00 67.09 50.94 2797.45 2731.25 6001354.86 567639.31 477.38 0.00 MWD+IFR+MS 3900.00 67.09 50.94 2836.37 2770.17 6001413.53 567710.32 498.76 0.00 MWD+IFR+MS 4000.00 67.09 50.94 2875.30 2809.10 6001472.19 567781.32 520.13 0.00 MWD+IFR+MS 4100.00 67.09 50.94 2914.23 2848.03 6001530.86 567852.33 541.50 0.00 MWD+IFR+MS 4177.60 67.09 50.94 2944.44 2878.24 6001576.38 567907.43 558.08 0.00 Start Dir4/100': 4177.6' MD, 4200.00 66.70 51.82 2953.23 2887.03 6001589.38 567923.41 563.02 4.00 MWD+IFR+MS 4300.00 65.01 55.79 2994.14 2927.94 6001643.91 567996.53 588.57 4.00 MWD+IFR+MS 4400.00 63.44 59.88 3037.64 2971.44 6001692.52 568072.29 619.80 4.00 MWD+IFR+MS 4500.00 61.98 64.07 3083.50 3017.30 6001734.97 568150.32 656.54 4.00 MWD+IFR+MS 4600.00 60.65 68.37 3131.52 3065.32 6001771.06 568230.24 698.63 4.00 MWD+IFR+MS 4700.00 59.47 72.78 3181.44 3115.24 6001800.60 568311.65 745.85 4.00 MWD+IFR+MS BP My Planning Report MAP Company: BPAmoco Date: ....718/2002 Time: >14:31:38 Page: 4 Field: Milne Point Co-()rdinate{NE) Reference: Well:Plan MPS-03,TrueNorth Site: M Pt S Pad Vertic.al (TVD) Reference: Plan MPS-03 66.2066.2 Well: Plan MPS-03 Section (VS) Reference: Well (0.00N,0.00E,127.53Azi) Wellpath: Plan MPS..03 Survey. Calculation Method: Minimum Curvature Db: Oracle Survey Incl Azim TVD Sys TVD MapN MapE VS DLS Tool/Comment deg deg ft ft ft ft ft deg/1 000 4800.00 58.43 77.29 3233.04 3166.84 6001823.46 568394.18 797.98 4.00 MWD+IFR+MS 4900.00 57.56 81.89 3286.05 3219.85 6001839.53 568477.40 854.76 4.00 MWD+IFR+MS 5000.00 56.86 86.58 3340.23 3274.03 6001848.72 568560.91 915.91 4.00 MWD+IFR+MS 5100.00 56.34 91.33 3395.30 3329.10 6001850.99 568644.32 981.14 4.00 MWD+IFR+MS 5200.00 56.00 96.13 3451.00 3384.80 6001846.33 568727.21 1050.14 4.00 MWD+IFR+MS 5300.00 55.84 100.95 3507.06 3440.86 6001834.76 568809.17 1122.55 4.00 MWD+IFR+MS 5400.00 55.88 105.79 3563.20 3497.00 6001816.34 568889.82 1198.04 4.00 MWD+IFR+MS 5441.04 55.95 107.77 3586.20 3520.00 6001806.82 568922.44 1229.82 4.00 TUgnu 5500.00 56.11 110.61 3619.15 3552.95 6001791.16 568968.75 1276.23 4.00 MWD+IFR+MS 5600.00 56.52 115.39 3674.64 3608.44 6001759.35 569045.58 1356.74 4.00 MWD+IFR+MS 5700.00 57.11 120.11 3729.39 3663.19 6001721.04 569119.94 1439.18 4.00 MWD+IFR+MS 5800.00 57.88 124.77 3783.15 3716.95 6001676.45 569191.47 1523.15 4.00 MWD+IFR+MS 5900.00 58.82 129.34 3835.64 3769.44 6001625.77 569259.81 1608.23 4.00 MWD+IFR+MS 6000.00 59.91 133.81 3886.62 3820.42 6001569.25 569324.64 1694.03 4.00 MWD+IFR+MS 6100.00 61.15 138.18 3935.83 3869.63 6001507.19 569385.63 1780.10 4.00 MWD+IFR+MS 6200.00 62.53 142.44 3983.04 3916.84 6001439.86 569442.49 1866.05 4.00 MWD+IFR+MS 6300.00 64.04 146.59 4028.01 3961.81 6001367.61 569494.95 1951.44 4.00 MWD+IFR+MS 6400.00 65.66 150.63 4070.52 4004.32 6001290.78 569542.75 2035.87 4.00 MWD+IFR+MS 6438.52 66.31 152.16 4086.20 4020.00 6001260.04 569559.87 2068.05 4.00 SBF2-NA 6500.00 67.38 154.56 4110.38 4044.18 6001209.75 569585.65 2118.92 4.00 MWD+IFR+MS 6507.36 67.51 154.85 4113.20 4047.00 6001203.63 569588.61 2124.97 4.00 SBF1-NB 6577.20 68.78 157.53 4139.20 4073.00 6001144.57 569615.29 2181.83 4.00 SBE4-NC 6600.00 69.20 158.40 4147.37 4081.17 6001124.92 569623.44 2200.18 4.00 MWD+IFR+MS 6613.67 69.46 158.91 4152.20 4086.00 6001113.05 569628.20 2211.13 4.00 SBE2-NE 6642.53 70.00 160.00 4162.20 4096.00 6001087.78 569637.93 2234.11 4.00 Togepi PUMP 6700.00 70.00 160.00 4181.85 4115.65 6001037.21 569656.84 2279.66 0.00 MWD+IFR+MS 6739.02 70.00 160.00 4195.20 4129.00 6001002.87 569669.69 2310.60 0.00 SBE1-NF 6788.72 70.00 160.00 4212.20 4146.00 6000959.13 569686.05 2350.00 0.00 Start Dir 4/100' : 6788.72' MD 6800.00 70.33 160.32 4216.03 4149.83 6000949.18 569689.73 2358.93 4.00 MWD+IFR+MS 6818.60 70.89 160.85 4222.20 4156.00 6000932.69 569695.71 2373.64 4.00 TSBD-OA 6900.00 73.33 163.11 4247.21 4181.01 6000859.25 569720.31 2437.50 4.00 MWD+IFR+MS 6910.52 73.64 163.40 4250.20 4184.00 6000849.62 569723.30 2445.68 4.00 TSBC 6970.60 75.46 165.03 4266.20 4200.00 6000794.05 569739.53 2492.11 4.00 MPS-03 Fault1 7000.00 76.36 165.82 4273.36 4207.16 6000766.52 569746.95 2514.61 4.00 MWD+IFR+MS 7016.59 76.86 166.26 4277.20 4211.00 6000750.89 569750.98 2527.24 4.00 TogepiT1a 7021.06 77.26 166.63 4278.20 4212.00 6000746.67 569752.04 2530.63 12.00 TSBB-OB 7025.00 77.61 166.96 4279.06 4212.86 6000742.93 569752.95 2533.61 12.00 MWD+IFR+MS 7050.00 79.85 168.99 4283.94 4217.74 6000719.00 569758.27 2552.26 12.00 MWD+IFR+MS 7075.00 82.10 171.00 4287.87 4221.67 6000694.73 569762.77 2570.47 12.00 MWD+IFR+MS 7100.00 84.36 172.99 4290.81 4224.61 6000670.18 569766.44 2588.18 12.00 MWD+IFR+MS 7125.00 86.63 174.96 4292.78 4226.58 6000645.42 569769.27 2605.35 12.00 MWD+IFR+MS 7150.00 88.90 176.93 4293.75 4227.55 6000620.53 569771.26 2621.93 12.00 MWD+IFR+MS 7175.91 91.25 178.96 4293.72 4227.52 6000594.65 569772.42 2638.44 12.00 End Dir : 7175.91' MD, 4293.7 7200.00 91.25 178.96 4293.20 4227.00 6000570.58 569773.07 2653.45 0.00 MWD+IFR+MS 7300.00 91.25 178.96 4291.01 4224.81 6000470.65 569775.78 2715.79 0.00 MWD+IFR+MS 7400.00 91.25 178.96 4288.83 4222.63 6000370.72 569778.48 2778.12 0.00 MWD+IFR+MS 7500.00 91.25 178.96 4286.65 4220.45 6000270.79 569781.18 2840.45 0.00 MWD+IFR+MS 7600.00 91.25 178.96 4284.47 4218.27 6000170.86 569783.89 2902.78 0.00 MWD+IFR+MS 7700.00 91.25 178.96 4282.28 4216.08 6000070.93 569786.59 2965.11 0.00 MWD+IFR+MS 7800.00 91.25 178.96 4280.10 4213.90 5999971.00 569789.29 3027.44 0.00 MWD+IFR+MS 7900.00 91.25 178.96 4277 .92 4211.72 5999871.07 569792.00 3089.78 0.00 MWD+IFR+MS 8000.00 91.25 178.96 4275.74 4209.54 5999771.14 569794.70 3152.11 0.00 MWD+IFR+MS BP My Planning Report MAP Company: BPAmoco Date:..........7/8/2002 Time: 14:31:38 Page: 5 Field: Milne Point Co-()rdinate(NE) Reference: Well:Plan MPS-03òTrueNorth Site: M Pt S Pad Vertical (fVD) Reference: Plan MPS-03 66.20 66.2 Well: Plan MPS-03 Section (VS) Reference: Well (O.00N,0.00E,127.53Azi) Wellpath: Plan MPS-03 Survey Calculation Method: Minimum Curvature Db: Oracle Survey Incl Azirn TVD SysTVD MapN MapE VS DLS Tool/Comment deg deg ft ft ft ft ft deg/1 000 8100.00 91.25 178.96 4273.56 4207.36 5999671.21 569797.40 3214.44 0.00 MWD+IFR+MS 8200.00 91.25 178.96 4271.37 4205.17 5999571.27 569800.11 3276.77 0.00 MWD+IFR+MS 8300.00 91.25 178.96 4269.19 4202.99 5999471.34 569802.81 3339.10 0.00 MWD+IFR+MS 8357.38 91.25 178.96 4267.94 4201.74 5999414.00 569804.36 3374.87 0.00 Start Dir 4/100' : 8357.38' MD 8400.00 90.92 180.63 4267.13 4200.93 5999371.40 569804.89 3400.95 4.00 MWD+IFR+MS 8500.00 90.13 184.55 4266.22 4200.02 5999271.50 569801.26 3458.20 4.00 MWD+IFR+MS 8516.55 90.00 185.20 4266.20 4200.00 5999255.00 569800.00 3467.13 4.00 TogepiT2 8532.48 89.36 185.20 4266.29 4200.09 5999239.13 569798.70 3475.65 4.00 End Dir : 8532.48' MD, 4266.2 8600.00 89.36 185.20 4267.04 4200.84 5999171.84 569793.18 3511.75 0.00 MWD+IFR+MS 8700.00 89.36 185.20 4268.15 4201.95 5999072.19 569785.00 3565.23 0.00 MWD+IFR+MS 8800.00 89.36 185.20 4269.26 4203.06 5998972.54 569776.83 3618.71 0.00 MWD+IFR+MS 8900.00 89.36 185.20 4270.38 4204.18 5998872.89 569768.65 3672.18 0.00 MWD+IFR+MS 9000.00 89.36 185.20 4271.49 4205.29 5998773.25 569760.47 3725.66 0.00 MWD+IFR+MS 9100.00 89.36 185.20 4272.60 4206.40 5998673.60 569752.30 3779.13 0.00 MWD+IFR+MS 9200.00 89.36 185.20 4273.71 4207.51 5998573.95 569744.12 3832.61 0.00 MWD+IFR+MS 9300.00 89.36 185.20 4274.82 4208.62 5998474.30 569735.95 3886.08 0.00 MWD+IFR+MS 9400.00 89.36 185.20 4275.93 4209.73 5998374.65 569727.77 3939.56 0.00 MWD+IFR+MS 9500.00 89.36 185.20 4277.05 4210.85 5998275.00 569719.60 3993.03 0.00 MWD+IFR+MS 9584.10 89.36 185.20 4277.98 4211.78 5998191.20 569712.72 4038.01 0.00 Start Dir 4/100' : 9584.1' MD, 9600.00 89.62 184.62 4278.12 4211.92 5998175.34 569711.50 4046.58 4.00 MWD+IFR+MS 9623.39 90.00 183.76 4278.20 4212.00 5998152.00 569710.00 4059.43 4.00 TogepiT3 9700.00 93.06 183.76 4276.15 4209.95 5998075.56 569705.66 4101.99 4.00 MWD+IFR+MS 9726.78 94.14 183.76 4274.47 4208.27 5998048.87 569704.14 4116.85 4.00 End Dir : 9726.78' MD, 4274.4 9800.00 94.14 183.76 4269.19 4202.99 5997975.97 569699.99 4157.44 0.00 MWD+IFR+MS 9875.65 94.14 183.76 4263.73 4197.53 5997900.64 569695.71 4199.38 0.00 Start Dir 4/100' : 9875.65' MD 9900.00 93.17 183.87 4262.18 4195.98 5997876.39 569694.31 4212.86 4.00 MWD+IFR+MS 9954.54 91.00 184.11 4260.20 4194.00 5997822.00 569691.00 4242.97 4.00 TogepiT4 9993.08 89.84 184.11 4259.92 4193.72 5997783.54 569688.58 4264.20 3.00 End Dir : 9993.08' MD, 4259.9 10000.00 89.84 184.11 4259.94 4193.74 5997776.63 569688.14 4268.01 0.00 MWD+IFR+MS 10100.00 89.84 184.11 4260.21 4194.01 5997676.84 569681.86 4323.08 0.00 MWD+IFR+MS 10200.00 89.84 184.11 4260.48 4194.28 5997577.05 569675.57 4378.15 0.00 MWD+IFR+MS 10300.00 89.84 184.11 4260.75 4194.55 5997477.26 569669.28 4433.22 0.00 MWD+IFR+MS 10400.00 89.84 184.11 4261.03 4194.83 5997377.46 569663.00 4488.29 0.00 MWD+IFR+MS 10463.59 89.84 184.11 4261.20 4195.00 5997314.01 569659.00 4523.31 0.00 TogepiT5 10463.58 89.84 184.11 4261.20 4195.00 5997314.02 569659.00 4523.30 0.00 Total Depth: 10463.6' MD, 426 10463.60 89.84 184.11 4261.20 4195.00 5997314.00 569659.00 4523.31 0.00 MWD+IFR+MS A TREE: Cameron 4-1/16" 5M i-JHOi-JOSI::.LJ COMi-JLI::.IION ~~~nLgH~:~:~~'?x~:~/~",11",5M ~'-Ps-n3 ~~-n3 ~""'1 FMC Tubing Hanger - 112' 20" 92 Ib/ft, H-40 Welded ~ / -- ~ 42" Hole Insulated Diesel Fleeze protectlD / ~ 4-112" X 1" %"¡; ~~~.;;'~~t:1o~e~'~~~;ti~~ ' 2000' rvD, 750' MD KB. ELEV =67.5' Cellar Box ELEV = 39.3' 9.2 KCI with corrosion inhibitor as packer fluid 4-1/211,12.6 Ibltt, L-80, IBT-M Coupling 00: 5.211 Orift/IO: 3.833" Burst: 8,430,80% 6,744 psi Collapse: 7,500, 80%=6,000 psi .~ "" BIW 1- Wire Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down to lower sensor) Jet Pump Installed in Sliding Sleeve Post rig! III Halliburtion Dura Sleeve XD WIX Nipple (3.813" ID) Phoenix Pressure Gauge (2.840" ID) 7-5/811 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing 10: 6.875 Coupling 00: 8.5" Burst: 6,890 psi Collapse: 4,790 psi 7-5/8" x 4-1/2" S-3 Packer I Set @ 6,678' MD, 4208' TVD I 3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod Wireline Entry Guide Window in 7" casing @ 6,778' MD Well Inclination @ Window = 70 Degrees \~ Multi-Lateral Junction 6,7781 6-1/8" OA Lateral TD 10,450' 6-1/8" OB Lateral TD 10,463' ....... ........ - - - - - -- OA Horizontal 6-1/8" hole r-- - ---- - - - - -- 4-1/2" Slotted Liner W/Hookwall hanger 7" Casing Shoe @ 7,016' MD Well Inclination @ Shoe = 76 Degrees ~ ~ ~..<:::, .~ 9-7/8"Hole " \ ... ------- , '-- 08 Horizontal 6-1/8" hole --------- PBTD TD 4-1/2" Slotted Liner & Hanger DATE 27 Jun 02 REV. BY SKC COMMENTS Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion Milne Point Unit WF~ ~ : MPS-03 API NO: CHECK 1 STANDARD LETTER DEVELOPMENT x DEVELOPMENT REDRILL EXPLORATION INJECTION WELL INJECTION WELL REDRILL Rev: 6/18/02 C\jody\templates ( ( TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME 1f~0 CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) PILOT HOLE (PH) ;11;:Ç ~O~ "CLUE" The permit is for a new wellbore segment of existing well --' Permit No, API No. Production should continue to be reported as a function of the original API number stated above. In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). ANNULAR DISPOSAL Please note that an disposal of fluids generated. . . INTO ANNULUS OF ANOTHER WELL ON SAME PAD <--> SP ACING EXCEPTION DRY DITCH SAMPLE Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samplés are first caught and 10' sample intervals through target zones. H 206975 DATE 7/01/02 INVOICE / CREDIT MEMO DESCRIPTION PERMIT TO DRILL FEE GROSS VENDOR DISCOUNT CK062602G /117J 5- 03 THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 PAY TO THE ORDER OF FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL CITY BANK CLEVELAND. OHIO 56-389 --¡j'2 13 fJ '".,'"r'Z, 'f' ~ 'If,...,'" ,11111\ IllIIt~. f'.'."" . .". ,..." ..II. ,', . " ._1 t l t } I ,.tl ,,""Û"' i>. .'.'. .~,.~~ ."..'..'... qllt 'Uti. ,mm unn. uu> ALASKA/STATE ALASKA OIL & GAS CONSERVATION 333 W 7'¡'H AVE STE 100 ANCHOgAG~i AK. 99501 DATE CHECK NO. 7/01/02 H206975 NET No. H2O 6 9 7 5 CONSOLIDATED COMMERCIAL ACCOUNT AMOUNT *****$100.00***** ~';.~~~~~:~~~~~~~~J~::~,:':3?~~::~~::::¡~~~.:~:t .:.:..:.:.::~~~::.~t''''i:''''~:'''..::.'''.~:.'.''1 j~~;rrrt~~;Fi.;~;~.~¿;¡t~;;:~~~;~:;t~ III 2 0 b g ? Sui I: 0 L. ~ 2 0 ~ 8 q 51: 008 L.'" ~ q III H RECEI\!fD JUL "1 0 2002 ,..-., Naska Oil & Gas Cons. \¡OíUliII;)~ll - Anchorage ~. ~/4 WELL PERMIT CHECKLIST COMPANY /5¡J.Y WELL NAME ~~) - 0,,- ~ PROGRAM: Exp - Dev X Redrll- Se~ - Wellbore seg - Ann. disposal para req - .FIElD&POOL _Ç'7.Ç/L/e> INITCLASS /},o..I./ )-ðlï GEOlAREA ~Î(j UNIT# //377 ON/OFFSHORE ~) ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . . fy' N 2. lease number appropriate. . . . . . . . . . . . . . . . . . . Y N 3. Unique well name and number. .. . . . . . . . . . . . . .. . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. . . . Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N 8. If deviated, is well bore plat included.. . . . . . . . . . . . . . Y N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N . ~.. ~~ -:p~)~ "') 12. Permit can be issued without administrative approval.. . . . . Y N I5TC // /j /6'-. 13. Can permit be approved before 15-day wait.. . . . . . . . . . ~ N ; ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . ÇJN '2.& II @ //2 . 15. Surface casing protects all known USDWs. . . . . . . . . . . Y N 16. CMT vol adequate to circulate on conductor & surf csg. . . . . .) N 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . .¥-N /Ii lA-51 oIf-..P { 18. CMT will cover all known productive horizons. . . . . . . . .. ~(;J! H 19. Casing designs adequate for C, T,. B & permafrost. . . . . . . . N 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . '. N Ð~v-- I'll. 21. If a re-drill, has a 10-403 for abandonment been approved. . . "'Ik 22. Adequate well bore separation proposed.. . . . . . . . . .-. . N 23. If diverter required, does it meet regulations. . . . . . . . . . N 24. Drilling fluid program schematic & equip list adequate. . . . . N 25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N P /-;, £ 26. BOPE press rating appropriate; test to '-ftJ()fCJ psig. N IJ7Ç ,40;", P ~I' ~ M d4 [~Î 'fR ~ L 5 Sot? I{;¡ , 27. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . . N 28. Work will occur without operation shutdown. . . . . . . . . . . ' ~. 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y ~ 30. Permit can be issued wlo hydrogen sulfide measures. .. . . CVN 31. Data presented on potential overpressure zones. . . . . .. )VN A J /7 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y / l/ I T7 AjPÆ .!?~~ l 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . N . . /frr: ?í/ //t"l?: 34. Contact namelphone for weekly progress reports [exploratory 0 1 Y N ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; . . . . . . . (B) will not contaminate freshwater; or cause drilling waste. .. to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular: MMISSION: RP~ JDH~ /5Jr.l WGA \;JG¡fr' ~~~~,A DA, T~ ~~. 7 11101- GEOLOGY APPR !,TE ~?,;þ¿ ) Commentsllnstructions: COT DTS 0 c; G:\geotogy\permits\checklistdoc Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process. but is part of the history file. To improve the readability of the Well History file and to simpltfy finding information, information of this nature is accumulated at the end of the file under APPEN.DIX. No special.effort has been made to chronologically organize this category of information. ... a Oa-)tJb 1!33~ Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Nov 26 14:24:00 2002 Reel Header Service name....... ..... .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 11 / 2 6 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number... ...01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 /11/2 6 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.......... .... ..UNKNOWN Continuation Number... ...01 Previous Tape Name...... . UNKNOWN Comments........... ..... .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-03 500292310500 BP Exploration (Alaska) Inc. Sperry-Sun Drilling Services 26-NOV-02 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 1 AK-MW-22127 B. HENNINGSE E. VAUGHN MWDRUN 2 AK-MW-22127 B. HENNINGSE E. VAUGHN MWDRUN 3 AK-MW-22127 B. HENNINGSE C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 7 12N 11E 3368 4744 66.20 38.70 # WELL CASING RECORD 1ST STRING 2ND STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 20.000 110.0 6.125 7.625 7301.0 (' 3RD STRING PRODUCTION STRING # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1, 2, AND 3 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUN 4 ALSO INCLUDED AT-BIT INCLINATION (ABI) . 4. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 8/29/02. MWD DATA ARE CONSIDERED PDC. 5. MWD RUNS 1, 2, AND 3 REPRESENT WELL MPS-03 WITH API#: 50-029-23105-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10270'MD/4248'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name.......... ...STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.... ...02/11/26 Maximum Physical Record. .65535 File Type... ............ .LO Previous File Name.... ...STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS 1 clipped curves; all bit runs merged. .5000 START DEPTH 73.5 90.5 90.5 90.5 90.5 STOP DEPTH 10216.5 10223.5 10223.5 10223.5 10223.5 ( RPX ROP $ 90.5 110.5 10223.5 10270.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA PBU TOOL MWD MWD MWD $ SOURCE CODE BIT RUN NO MERGE TOP 1 73.5 2 3527.0 3 7320.0 MERGE BASE 3527.0 7320.0 10270.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type............. .....0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.. ... ..... .Feet Data Reference Point.. ....... .... . Undefined Frame Spacing....... ............. .60 .1IN Max frames per record............ . Undefined Absent value.............. ...... ..-999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 73.5 10270 5171.75 20394 73.5 10270 ROP MWD FT/H 2.91 3867.61 330.611 20320 110.5 10270 GR MWD API 8.22 129.18 68.9413 20287 73.5 10216.5 RPX MWD OHMM 0.14 1667.6 26.322 20267 90.5 10223.5 RPS MWD OHMM 0.08 2000 35.2466 20267 90.5 10223.5 RPM MWD OHMM 0.06 2000 49.7397 20267 90.5 10223.5 RPD MWD OHMM 0.05 2000 89.8121 20267 90.5 10223.5 FET MWD HOUR 0.0467 83.027 0.779301 20267 90.5 10223.5 First Reading For Entire File. ...... ...73.5 Last Reading For Entire File... ...... ..10270 File Trailer Service name........... ..STSLIB.001 Service Sub Level Name. . . Version Number... ....... .1.0.0 Date of Generation...... .02/11/26 ( Maximum physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name...... ..... ..STSLIB.002 Service Sub Level Name. . . Version Number......... ..1.0.0 Date of Generation.... ...02/11/26 Maximum Physical Record..65535 File Type. .............. .LO Previous File Name..... ..STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 2 ( header data for each bit run in separate files. 1 .5000 START DEPTH 73.5 90.5 90.5 90.5 90.5 90.5 110.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 3490.0 3482.0 3482.0 3482.0 3482.0 3482.0 3527.0 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER1S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: 29-JUL-02 Insite 66.37 Memory 3527.0 1110.0 3527.0 .4 71.6 TOOL NUMBER 164580 121079 9.875 110.0 Spud Mud 9.00 165.0 7.0 MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 400 10.0 5.800 5.080 4.500 3.500 65.0 75.2 64.0 65.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction........... ..... . Down Optical log depth units.......... .Feet Data Reference Point.... ... ... ... . Undefined Frame Spacing.. .................. .60 .1IN Max frames per record... ...... ... . Undefined Absen t value. . . . . . . . . . . . . . . . . . . . . . - 999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWD010 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 FET MWD010 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 73.5 3527 1800.25 6908 73.5 3527 ROP MWD010 FT/H 17.09 3867.61 394.976 6834 110.5 3527 GR MWD010 API 14.33 125.1 65.0851 6834 73.5 3490 RPX MWD010 OHMM 0.14 1667.6 44.0179 6784 90.5 3482 RPS MWD010 OHMM 0.08 2000 65.019 6784 90.5 3482 RPM MWD010 OHMM 0.06 2000 91.4987 6784 90.5 3482 RPD MWD010 OHMM 0.05 2000 203.697 6784 90.5 3482 FET MWD010 HOUR 0.0467 1.5087 0.272658 6784 90.5 3482 First Reading For Entire File. .... .... .73.5 Last Reading For Entire File.... ... ....3527 File Trailer Service name...... ...... .STSLIB.002 Service Sub Level Name. . . Version Number......... ..1.0.0 Date of Generation.. ... ..02/11/26 Maximum Physical Record..65535 ( File Type................LO Next File Name......... ..STSLIB.003 Physical EOF File Header Service name...... .... ...STSLIB.003 Service Sub Level Name... Version Number..... ..... .1.0.0 Date of Generation...... .02/11/26 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name... ... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX GR ROP $ 3 header data for each bit run in separate files. 2 .5000 START DEPTH 3482.5 3482.5 3482.5 3482.5 3482.5 3490.5 3527.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ # STOP DEPTH 7274.5 7274.5 7274.5 7274.5 7274.5 7282.0 7320.0 BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): 31-JUL-02 Insite 66.37 Memory 7320.0 3527.0 7320.0 53.8 84.8 TOOL NUMBER 164580 121079 9.875 110.0 Spud Mud 9.20 124.0 7.0 400 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 8.4 8.200 5.190 6.000 4.600 65.0 106.7 65.0 65.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type. .......... ..... ..0 Data Specification Block Type.....O Logging Direction... ............. . Down Optical log depth units. ........ ..Feet Data Reference Point.. ......... ...Undefined Frame Spacing..................... 60 .1IN Max frames per record............ . Undefined Absent value.. . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3482.5 7320 5401.25 7676 3482.5 7320 ROP MWD020 FT/H 2.91 1497.42 359.23 7586 3527.5 7320 GR MWD020 API 8.22 129.18 68.8214 7584 3490.5 7282 RPX MWD020 OHMM 3.4 215.57 16.4224 7585 3482.5 7274.5 RPS MWD020 OHMM 2.97 467.87 18.1308 7585 3482.5 7274.5 RPM MWD020 OHMM 2.1 584.16 18.9837 7585 3482.5 7274.5 RPD MWD020 OHMM 2.28 1901.8 25.8766 7585 3482.5 7274.5 FET MWD020 HOUR 0.0489 8.1506 0.530121 7585 3482.5 7274.5 First Reading For Entire File. ........ .3482.5 Last Reading For Entire File.. ........ .7320 File Trailer Service name..... ....... .STSLIB.003 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation... ....02/11/26 Maximum Physical Record..65535 F i 1 e Type... . . . . . . . . . . . . . LO (. Next File Name...... .... .STSLIB.004 Physical EOF File Header Service name........... ..STSLIB.004 Service Sub Level Name... Version Number...... .....1.0.0 Date of Generation...... .02/11/26 Maximum Physical Record. .65535 File Type.. . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 4 header data for each bit run in separate files. 3 .5000 START DEPTH 7275.0 7275.0 7275.0 7275.0 7275.0 7282.5 7320.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 10223.5 10223.5 10223.5 10223.5 10223.5 10216.5 10270.0 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): 04-AUG-02 Insite 66.37 Memory 10270.0 7320.0 10270.0 77.8 95.9 TOOL NUMBER 151107 156401 6.125 7301.0 Flo-pro 9.10 55.0 9.5 29500 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: .160 .130 .160 .180 75.0 95.1 75.0 75.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..... ....... .... ..0 Data Specification Block Type.. ...0 Logging Direction....... ........ ..Down Optical log depth units.......... .Feet Data Reference Point. ........ ... ..Undefined Frame Spacing......... .......... ..60 .1IN Max frames per record... ......... . Undefined Absent value... ... ......... ..... ..-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7275 10270 8772.5 5991 7275 10270 ROP MWD030 FT/H 12.94 1003.64 219.26 5900 7320.5 10270 GR MWD030 API 32.92 121.88 73.5866 5869 7282.5 10216.5 RPX MWD030 OHMM 2.38 1442.89 18.699 5898 7275 10223.5 RPS MWD030 OHMM 5.29 290.98 23.0133 5898 7275 10223.5 RPM MWD030 OHMM 6.04 2000 41.2606 5898 7275 10223.5 RPD MWD030 OHMM 1.74 2000 41.0422 5898 7275 10223.5 FET MWD030 HOUR 0.1119 83.027 1.6825 5898 7275 10223.5 First Reading For Entire File......... .7275 Last Reading For Entire File.......... .10270 File Trailer Service name...... ...... .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/11/26 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 02/11/26 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name... .......... ...UNKNOWN Continuation Number... ...01 Next Tape Name.......... . UNKNOWN Comments............. ....STS LIS Reel Trailer Service name....... .... ..LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 11 / 2 6 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name..... ... ...... ..UNKNOWN Continuation Number..... .01 Next Reel Name..... ..... . UNKNOWN Comments...... ......... ..STS LIS Physical EOF Physical EOF End Of LIS File Writing Library. Scientific Technical Services Writing Library. Scientific Technical Services