Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-175
) )
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
c1 0 a-I 7 6 Well History File Identifier
D Two-sided 1111111111111111111
Page Count from Scanned File: <3' 3 (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES,
Helen ~ Datel/. ' 4- ÓLf'
If NO in stage 1 page(s) discrepancies were found:
Organizing (done)
R,ESCAN
DIGITAL DATA
~skettes, No.3
0 Other, No/Type:
0 Color Items:
0 Greyscale Items:
[] Poor Quality Originals:
[] Other:
NOTES:
BY:
Helen (fa;)
Project Proofing
BY:
Helen~
Scanning Preparation
~
/po
x 30 =
BY:
Helen ~
Production Scanning
Stage 1
BY:
Stage 1
BY:
Helen Maria
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Helen Maria
Comments about this file:
D Rescan Needed 1111111111111111111
OVERSIZED (Scannable)
0 Maps:
0 Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
0 Logs of various kinds:
0 Other::
151 ¡tijf
1111111111111111111
Date /ð. a.r¡ / CXf 151 VV1 P
+ :22- = TOT ALl PAGES ~;l
(Count d~~. not iDcly,dp cover S})fx.t)L]
Date: IO/~'C¡ O'r /s/ yrt r
. 1111111111111111111
Date:
NO
151 I41P
YES NO
Date: /s/
I11III1111111111111
1111111111111111111
Date: /s/
Quality Checked IIIIII11I1111111111
8/24/2004 Well History File Cover Page.doc
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marlœr.doc
)
R,E(~
OC1 2 6 'lOOS
A\~ska Œ~ ~f¡1.
)
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Corom.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
May 23, 2003
RE: MWD Formation Evaluation Logs: S-114 & S-114A,
~/3 jt../) 8-114 & S-114A:
Digital Log Images:
50-029-23116-00,01
AK-MW-22152
1 CD Rom
SCANNED NOV 0 2 2005
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
Date:l) oà- ~~
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Signed: 1j~J¿(jL,'
?vo~-t~.$-
~ïL
I 7 ò~. ;l{)()t1
DATA SUBMITTAL COMPLIANCE REPORT
10/4/2004
J f. 'i ¿ L-( J1''f-- .JJ-1} 2-,-
API No. 50-029-23116-00-00
Permit to Drill 2021750
Well Name/No. PRUDHOE BAY UN AURO S-114
Operator BP EXPLORATION (ALASKA) INC
MD 15603 ~/ TVD 6860 './ Completion Date 9/17/2002 ~
Current Status P&A
Completion Status P&A
UIC N
- ------- -----~-.~--------'------------
--'-_._--~~'---'-'--'---'--~---'-~
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
-----~._--------
------~----------------_.,~~
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES,PWD
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset Log Log Run Interval OH/
Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments
~D-------- Directional Survey 1 1364 15603 Open 1 0/17/2002 IIFR
éRPt Directional Survey 1 1364 15603 Open 1 0/17/2002 IIFR
{)ill D Directional Survey 0 1364 Open 1 0/17/2002 GYRO
L-Rpt Directional Survey 1364 15603 Open 1 0/17/2002 MWD
~ D Directional Survey 1364 15603 Open 1 0/17/2002 MWD
CÆo D 4675 ttSjterlflCation'~ (~(l..! ¿UJ~Y; I C~fl J I.-Ò/(l..òr 59 15556 Open 3/26/2003
~ LIS Verification 59 15556 Open 3/26/2003
S-pt/ Directional Survey 0 1364 Open 1 0/17/2002 GYRO
(ED C Asc {2003 LIS Verification 1,2,3,4 59 15603 Open 6/2/2003
-k~ C Asc 12003 LIS Verification 1,2,3,4 59 15603 Open 6/2/2003
C Pdf '4 2003 Induction/Resistivity 25 Final 115 6861 Open 6/2/2003 MWD-NGP, EWR-TVD.
The MWD, EWR MD file
on this disk is corrupt.
Called Rob Kalish 9/18/03.
He is going on vacation
until 1 0/16/03. Will send
us a new CD then.
~ED C Pdf 11'2003 Neutron 25 Final 115 15603 Open 6/2/2003 MWD-DGR, CNP, SLD-MD
ED C Pdf 12003 Neutron 25 Final 115 6861 Open 6/2/2003 MWD-DGR, CNP, SLD-
c/ TVD
V"ED C Pdf 12003 Density 25 Final 115 15603 Open 6/2/2003 MWD-DGR, CNP, SLD-MD
ÆD C Pdf ~003 Density 25 Final 115 6861 Open 6/2/2003 MWD-DGR, CNP, SLD-
v TVD
--,-,--------.- --- -- .---.------
-
-'----
Permitto Drill 2021750
MD 15603
NO 6860
Well Cores/Samples Information:
Name
ADDITIONAL INFORM~..ON
Well Cored? Y [/ N)
----
------=--=
Chips Received? -rT N
Analysis
Received?
~
---~-~
Comments:
~------
-<.-------
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
10/4/2004
Well Name/No. PRUDHOE BAY UN AURO 5-114
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23116-00-00
Completion Date 9/17/2002
Completion Status P&A
Interval
Start Stop
Sent
Received
Daily History Received?
Formation Tops
~~
Current Status P&A
UIC N
Sample
Set
Number Comments
(}IN
léJN
~.
Date:
~'t Oc't-IS-
/'
~
cJ ~^( qð'
)
é90Ð - 'i~
\ dCXJ3
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation COmtn.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
May 23, 2003
RE: MWD Fonnation Evaluation Logs: S-114 AURO~
AK-MW-22152
S,.114 AURORA:
Digital Log Images:
50-029-23116-00
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
5 ¿P'.3 ~ 3 é). Sl..¡)
"~.:::- '~
Signed:~O \_~ IV\. ~,~~~
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
RECEIVED
JUN 0 2 2003
~~~""~
Alaska 0;'1 & GaG Cons. Commise1on
Anchorage
)
dCÐ-/15
/ ¡(PIS
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7fu Avenue, Suite 100
Anchorage, Alaska
March 21, 2003
RE: MWD Formation Evaluation Logs S...114,
AK-MW-22152
1 LDWG formatted Disc with verification listing.
API#: 50-029-23116-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITfAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Signoo~lAru
RECEIVED
MAR 2 6 2003
Aiaaka Oti & Gas Cons. Commission
Anchorage
..
')
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
1. Status of Well ''',,'' ',V" VW":"~!"''''1!
0 Oil 0 Gas 0 Suspended a Abandoned 0 Service ~,.lOCAT1ON$'\
2. Name of Operator ~ ~!.~:Wla) ~,
'" , ,.¡.
BP Exploration (Alaska) Inc. ot,f,,_,',',,',,: ,,' """'" ',..,t IT," .'" ~ : ¿,'.', I,.
3. Address ~,~!.!, .;:{;i~
P.O. Box 196612, Anchorage, Alaska 99519-6612 ~J...,..nt.ûf.~" ,
4 Location of well at surface fL'~~:;"~~'".',::,-,,-~,,~:.
. 4617' NSL, 4496' WEL, SEC. 35, T12N, R12E, UM i . ''''ü!~':.;~,~ ~
At top of productive interval i .~.!..!._2!_J2.i-
4749' NSL, 367' WEL, SEC. 29, T12N, R12E, UM!~ 't;f::~n'}. ~
4~6~~~k~~~~11 WEL, SEC. 29, T12N, R12E, UM L...~;.~::,~
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No.
KBE = 70.2' ADL 028259
12. Date Spudped 13. Date T.D. Reached 14. Date Comp., Susp., or AÞand.
9/4/2002 ' 9/16/2002 . 9/17/2002 Ail' ~
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
15603 6860 FT 12188 5253 FT a Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, RES, PWD
Classification of Service Well
7. Permit Number
202-175 302-301
8. API Number
50-029-23116-00
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
S-114
11. Field and Pool
Prudhoe Bay Field I Aurora Pool
(Undefined)
15. Water depth, if offshore 16. No. of Completions
NI A MSL Zero
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1900' (Approx.)
23.
CASING
SIZE
20"
10-3/4"
WT. PER FT.
91.51#
45.5#
GRADE
H-40
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 115' 30" 260 sx Arctic Set (Approx.)
34' 6140' 13-1/2" 942 sx Articset Lite III, 726 sx 'G'
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
None
25.
SIZE
NIA
MD
TVD
TVD
MD
TUBING RECORD
DEPTH SET (MD)
PACKER SET (MD)
O\-\ ~ ~cc:~~)e..
1J:4
Jd),. \1 . ~-~
J'"'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
12450' P&A (S-114) wI 70 Bbls Class 'G'
12188' Kick Off Plug; 51 Bbls Class 'G'
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28. CORE DATA
, Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit ci<ct!>l t I V t D
27.
Date First Production
Not on Production
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
NIA
PRODUCTION FOR OIL-BBL
TEST PERIOD
GAs-McF
WATER-BBL
OIL-BBL
GAs-McF
WATER-BBL
No core samples were taken.
NO\! ¡ P
-~onaIS
] . J !'1 B F L
~F
Form 10-407 Rev. 07-01-80
CHOKE SIZE
GAS-OIL RATIO
OIL GRAVITY-API (CORR)
NOV 0 8 2002
Alaska Oil & Gas G1Jns. Commission
Anchorage
Submit In Duplicate
)
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
Ugnu
6761'
3566'
Ugnu M Sands
10133'
4626'
Schrader Bluff N Sands
10927'
4847'
Schrader Bluff 0 Sands
11305'
4962
HRZ
15188'
6488'
Kalubik
15377'
6656'
Kuparuk C
15404'
6681'
RECEIVED
NOV 0 82002
Alaska Oil-& Gas Qons. Commtssttlh
Anchorage
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I ~erebY certify that the f/oin: is true and correct to the best of my knowledge
Signed Terrie Hubble /fOAALl, t{u ~ Title Technical Assistant Date I (... ~ O~
S-114 202-175 302-301 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No. Drilling Engineer: Walter Quay, 564-4178
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Legal Name: 5-114
Common Name: 5-114
Test Date
9/10/2002
Test Type
LOT
Test Depth (TMD)
6,140.0 (ft)
BP EXPLORATION
Leak-Off Test Summary
Test Depth (TVD)
3,375.0 (ft)
AMW
9.40 (ppg)
Surface Pressure
1,100 (psi)
leak Off Pressure (BHP)
2,748 (psi)
Page 1 of 1
EMW
15.67 (ppg)
Printed: 9/30/2002 9:17:50 AM
')
/
mœ...m~~I...QAATIØN
Operations Summary Report
Pagetof16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-114
S-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
9/3/2002
Spud Date: 9/4/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
9/3/2002 12:00 - 12:30 0.50 MOB P PRE Held PJSM. Secured Rig Floor.
12:30 - 13:00 0.50 MOB P PRE Skidded Rig Floor.
13:00 - 17:00 4.00 MOB P PRE Moved off of S-18A. Moved in Rig and Spotted over S-114.
17:00 -18:00 1.00 MOB P PRE Shimmed and Set Rig.
18:00 - 19:00 1.00 MOB P PRE Skidded Drill Floor into position and connected lines. Spotted
Cuttings Tank.
19:00 - 21 :00 2.00 DIVRTR P SURF Held PJSM. Measured RKB's. N 1 U Diverter and Diverter Line.
Took on Spud Mud and Water.
Accepted Rig at 1900 hrs 9 1 3 1 2002.
21 :00 - 00:00 3.00 DIVRTR P SURF Loaded Pipe Shed wI 5" DP. M 1 U Lines Under Rig Floor.
9/4/2002 00:00 - 02:30 2.50 DRILL P SURF Held PJSM. R 1 U 5" DP Handling Equipment. PI U Bails and
Elevators.
02:30 - 08:30 6.00 DRILL P SURF Held PJSM. M 1 U and Stood back in Derrick 25 Stands of 5"
Drill Pipe and 7 Stands of 5" HWDP.
08:30 - 09:00 0.50 DIVRTR P SURF Function Tested Diverter System, OK. Koomey Test, OK.
Witnessing of Diverter Function Test waived by AOGCC Rep
Jeff Jones.
09:00 - 10:30 1.50 DRILL P SURF Held P JSM. M 1 U BHA #1. 13-1/2" Security XL 1 N Bit, Ser#
744995, dressed w/1x14, 3x18 jets, 8" SperryDrill Lobe 6/7 4.0
stg Motor, 12.18" Undergauge Sleeve Stabilizer, XO, Float
Sub, Pony Flex Collar, Hang Off Sub, Orienting Sub, Pony Flex
Collar, Flex Collar and Drilling Jars. Total BHA Length-
146.87'.
10:30 - 11:00 0.50 DRILL P SURF Held Pre-Spud Meeting.
11 :00 - 13:00 2.00 DRILL P SURF M 1 U Top Drive, Circulated Mud System to Shear Gels through
Bit Nozzles. R 1 U Slickline for Gyro Runs.
13:00 - 00:00 11.00 DRILL P SURF Drilled 13-1/2" Directional Hole by Rotating and Sliding from
115' to 744'. WOB 5,000# - 35,000#, RPM 50, Motor RPM 83,
Torque Off Bottom 1,000 ft Ilbs - On Bottom 3,000 ft Ilbs,
Pump Rate 550 gpm, SPP Off Bottom 1,350 psi, On Bottom
1,450 psi. Took Gyro Surveys every 90'.
ART = 2.62 hrs, AST = 2.45 hrs. Total Krevs = 33
9/5/2002 00:00 - 22:30 22.50 DRILL P SURF Drilled 13-1/2" Directional Hole by Rotating and Sliding from
774' to 2,401'. WOB Sliding 35,000# - 50,000#, WOB Rotating
25,000# - 40,000# RPM 50, Motor RPM 83, Torque Off Bottom
3,000 ft Ilbs - On Bottom 8,000 ft Ilbs, Pump Rate 550 gpm,
SPP Off Bottom 1,800 psi, On Bottom 2,100 psi. Took Gyro
Surveys every 90' to 1,300'.
ART = 4.82 hrs, AST = 8.93 hrs.
22:30 - 23:30 1.00 DRILL P SURF Circulated Bottoms Up. Pump Rate 550 gpm, SPP 1,800 psi.
Circulated until Returns over Shakers Cleaned Up. Flow
Checked Well, Well Static.
23:30 - 00:00 0.50 DRILL P SURF POOH fl Bit Trip from 2,401' to 1,650'. Maximum Overpull
35,000#, Average Drag 3,000#.
9/6/2002 00:00 - 01 :30 1.50 DRILL P SURF Held PJSM. POOH fl Bit Trip from 1,650' to Surface. Maximum
Ove rpu II 1 0,000#, Average Drag 3,000#.
01 :30 - 03:00 1.50 DRILL P SURF Held PJSM. M 1 U BHA #2. 13-1/2" STC MGXi-C Bit, Ser#
ML3092, dressed w/1x12, 1x14, 2x20 jets, 8" SperryDrill Lobe
6/7 4.0 stg Motor wI 1.5 deg Bent Housing, 13.125"
Undergauge Sleeve Stabilizer, XO, Float Sub, Pony Flex
Collar, Hang Off Sub, Orienting Sub, Pony Flex Collar, Flex
Collar, Drilling Jars and 21 Jts 5" HWDP. Total BHA Length -
774.74'. Changed Out MWD Pulser. M 1 U Top Drive and
Printed: 913012002 9:18:00 AM
BA»EÐ(PLOAATION
Opel"ati'øn$~...mmäf\¥RgpQ.rt
P¿agê2of1ß
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-114
S-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
9/3/2002
Spud Date: 9/4/2002
End:
Date From'- To Hours Task Code NPT Phase Descriptipn...of.Opêtations
9/6/2002 01 :30 - 03:00 1.50 DRILL P SURF Surface Tested MWD Tools, OK.
03:00 - 04:00 1.00 DRILL P SURF RIH wI 13-1/2" Directional BHA on 5" DP to 2,306'. Worked
Through Dogleg at 1,685'. Washed Down as a Precaution from
2,306' to 2,401'.
04:00 - 00:00 20.00 DRILL P SURF Drilled 13-1/2" Directional Hole by Rotating and Sliding from
2,401' to 4,100'. WOB Sliding 40,000# - 50,000#, WOB
Rotating 20,000# - 25,000# RPM 70, Motor RPM 83, Torque
Off Bottom 6,000 ft Ilbs - On Bottom 10,000 ft Ilbs, Pump
Rate 650 gpm, SPP Off Bottom 2,550 psi, On Bottom 2,850
psi.
String Weight Up 125,000#, String Weight Down 85,000#,
String Weight Rotating 105,000#.
ART = 6.32 hrs, AST = 5.49 hrs. Krevs 85
917/2002 00:00 - 01 :00 1.00 DRILL P SURF Held PJSM. Drilled 13-1/2" Directional Hole by Rotating from
4,100' to 4,220'. WOB 20,000# - 35,000# RPM 70, Motor RPM
83, Torque Off Bottom 6,000 ft Ilbs - On Bottom 11,000 ft Ilbs,
Pump Rate 650 gpm, SPP Off Bottom 2,550 psi, On Bottom
2,750 psi. String Weight Up 125,000#, String Weight Down
85,000#, String Weight Rotating 105,000#.
01 :00 - 02:00 1.00 DRILL P SURF Circulated Bottoms Up. Pump Rate 650 gpm, SPP 2,500 psi.
Flow Checked Well, Well Static.
02:00 - 03:00 1.00 DRILL P SURF Held PJSM. POOH from 4,220' to 1,635'. Maximum Overpull
50,000# at 2,750', Average Drag 10,000#.
03:00 - 04:00 1.00 DRILL P SURF RIH after Wiper Trip from 1,635' to 4,124'. Set Down at 2,750'.
Worked through Tight Spot at 2,750' Several Times. M 1 U Top
Drive, Washed Down as a Precaution from 4,124' to 4,220', No
Fill.
04:00 - 00:00 20.00 DRILL P SURF Drilled 13-1/2" Directional Hole by Rotating and Sliding from
4,220' to 5,850'. WOB Sliding 45,000# - 65,000#, WOB
Rotating 20,000# - 35,000#, RPM 70, Motor RPM 83, Torque
Off Bottom 10,000 ft Ilbs - On Bottom 13,000 ft Ilbs, Pump
Rate 650 gpm, SPP Off Bottom 2,700 psi, On Bottom 2,900
psi. String Weight Up 135,000#, String Weight Down 95,000#,
String Weight Rotating 110,000#. ART = 13.13 hrs, AST = 1.64
hrs. Krevs 214
9/8/2002 00:00 - 03:00 3.00 DRILL P SURF Held PJSM. Drilled 13-1/2" Directional Hole by Rotating and
Sliding from 5,850' to 6,155'. WOB Rotating 20,000# - 45,000#,
WOB Sliding 45,000# - 60,000#, RPM 70, Motor RPM 83,
Torque Off Bottom 11,000 ft Ilbs - On Bottom 14,000 ft Jibs,
Pump Rate 650 gpm, SPP Off Bottom 2,800 psi, On Bottom
2,950 psi. String Weight Up 135,000#, String Weight Down
95,000#, String Weight Rotating 110,000#. ART = 1.64 hrs,
AST = 0.30 hrs. Total Krevs = 231
03:00 - 04:00 1.00 DRILL P SURF Circulated Bottoms Up. Pump Rate 650 gpm, SPP 2,800 psi.
Flow Checked Well, Well Static.
04:00 - 06:30 2.50 DRILL P SURF Held PJSM. POOH for Wiper Trip from 6,155' to 618'.
Maximum Overpull60,OOO# at 4,300', Average Drag 15,000#.
Worked Through Tight Spots at 4,300' - 4,100' and 2,000' -
1,700'.
06:30 - 09:00 2.50 DRILL P SURF RIH after Wiper Trip from 618' to 6,060'. M 1 U Top Drive,
Washed Down as a Precaution from 6,060' to 6,155'.
09:00 - 10:30 1.50 DRILL P SURF Circulated Bottoms Up. Pump Rate 650 gpm, SPP 2,750 psi.
Circulated Until Returns over Shaker were Clean. Flow
Printed: 913012002 9: 18:00 AM
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
9/8/2002
9/9/2002
8-114
8-114
DRILL +COMPLETE
DOYON
DOYON 14
From - To Hours Task Code NPT Phase
09:00 -10:30 1.50 DRILL P
10:30 - 12:00 1.50 DRILL P
12:00 - 14:00 2.00 DRILL P
14:00 - 14:30 0.50 CASE P
14:30 -16:00 1.50 CASE P
16:00 - 16:30 0.50 CASE P
16:30 - 00:00 7.50 CASE P
00:00 - 02:00 2.00 CASE P
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
02:00 - 02:30
0.50 CASE P
SURF
02:30 - 03:00 0.50 CASE P SURF
03:00 - 04:00 1.00 CEMT P SURF
04:00 - 08:00 4.00 CEMT P SURF
Page 3 of 16
Start:
Rig Release:
Rig Number: 14
8pud Date: 9/4/2002
End:
9/3/2002
Description of Operations
Checked Well, Well Static.
Held PJSM. POOH wi 5" DP from 6,155' to 774'.
Held PJSM. POOH, Flushed wi Water, Broke Out and LID
Flex D.C., MWD and Mud Motor.
Cleared and Cleaned Rig Floor.
Held PJSM. R I U Equipment to Run 10-3/4" Casing.
M I U Float Shoe Joint, 1 Jt of 10-3/4" Casing and Float Collar
Joint. Filled Casing and Checked Float Equipment, OK.
M I U and RIH wi 10-3/4", 45.5#, L-80, BTC Casing. Average M
I U Torque 9,500 ft Ilbs. 105 Jts ran at 2359 hrs.
Held PJSM. Continued to RIH wi Surface Casing. Ran a Total
of 146 Joints of 10-3/4",45.5#, l-80, BTC Casing. Average M I
U Torque 9,500 ft Ilbs.
M I U 10-3/4" Casing Hanger and Landing Joint. Landed
Casing. 10-3/4" Casing Set As Follows:
Item Length Depth
Float Shoe 1.76' 6,139.30'
2 Jts 10-3/4" 45.5# L-80 BTC Csg 83.71' 6,053.83'
Float Collar 1.21' 6,052.62'
12110-3/4" 45.5# L-80 BTC Csg 5,020.44' 1,032.18'
TAM Port Collar Assembly 42.21' 989.97'
2310-3/4" 45.5# L-80 BTC Csg 954.22' 35.75'
10-3/4" Casing Hanger 1.79' 33.90'
Circulated to Condition Hole. Pump Rate 13 bpm, SPP 1,100
psi. Reciprocated Casing while Circulating, String Weight Up
210,000#, String Weight Down 100,000#.
RID Franks Tool, M I U Cement Head wi Plugs to Casing,
Continued to Circulate Hole. Pump Rate 13 bpm, SPP 1,050
psi.
Held PJSM wi Dowell Crews, Rig Crews and Peak Truck
Drivers. Switched over to Dowell. Pumped 15 bbls of MudPush
at 3.0 bpm, 250 psi. Shut in Cement Manifold and Tested Lines
to 3,500 psi, OK. Pumped 60 bbls of MudPush at 5.5 bpm, 480
psi. Dropped Bottom Plug, Pumped 745 bbls (943 sx) 10.7 ppg
ArcticSet lite III lead Cement, Followed by 150 bbls (720 sx)
15.8 ppg Premium Tail Cement wi 0.300% bwoc Dispersant,
0.40% bwoc Fluid Loss, 0.20 gallsk AntiFoam and 1.00 %
bwoc Accelerator. Reciprocated Casing While Cementing.
Pumped Cement at the Following Rates:
Pumped Rate
100.0 bbls 8.00 bpm
200.0 bbls 8.00 bpm
300.0 bbls 8.00 bpm
400.0 bbls 8.00 bpm
500.0 bbls 8.00 bpm
600.0 bbls 8.00 bpm
700.0 bbls 8.00 bpm
745.0 bbls 3.00 bpm
Pumping Tail Cement
800.0 bbls 5.50 bpm
Pressure
800 psi
775 psi
750 psi
750 psi
750 psi
780 psi
830 psi
285 psi
950 psi
Printed: 913012002 9: 18:00 AM
BPffiXPl..<DAATI0N
OperatiQIiI$<.Summary....Repsl"t
Page 4öf16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-114
S-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
9/3/2002
Spud Date: 9/4/2002
End:
Date From - To Hours Task Code NPT Phase Description
9/9/2002 04:00 - 08:00 4.00 CEMT P SURF 850.0 bbls 5.75 bpm 955 psi
895.0 bbls 2.50 bpm 250 psi
Dropped Top Plug, Pumped 10 bbls of Water at 6.0 bpm, 300
psi. Switched to Rig Pumps and Displaced w/ 575 bbls of Mud
at the Following Rates:
Pumped Rate Pressure
100.0 bbls 12.00 bpm 675 psi
200.0 bbls 12.00 bpm 800 psi
300.0 bbls 12.00 bpm 900 psi
400.0 bbls 9.00 bpm 950 psi
500.0 bbls 9.00 bpm 1 ,150 psi
525.0 bbls 9.00 bpm 900 psi
550.0 bbls 7.00 bpm 1,000 psi
560.0 bbls 7.00 bpm 1 ,1 00 psi
585.0 bbls 7.00 bpm 1 ,100 psi
Wiper Plug Bumped w/585 bbls Total Displacement Pumped.
Pressured up to 1,600 psi, OK. Apx 200 bbls of Lead Cement
to Surface. Cement in Place @ 0745 Hrs. Bled off Pressure,
Floats Held.
08:00 - 09:00 1.00 CEMT P SURF Flushed Diverter. R / D Cement Head and Lines. Broke out and
L / D Landing Joint.
09:00 - 10:30 1.50 DIVRTR P INT1 Held PJSM. Cleaned and Cleared Rig Floor. N / D Diverter and
Surface Stack.
10:30 -11:00 0.50 WHSUR P INT1 N I U 13-5/8" x 5,000 psi Split-Speed Wellhead. Tested to
1,000 psi f/1 0 minutes, OK.
11 :00 - 14:30 3.50 BOPSUR P INT1 Held PJSM. N I U 13-5/8" x 5,000 psi BOP Stack. Hydril
Annular Preventer, Top Pipe Ram wI 4-1/2" x 7" Variable
Rams, Blind Rams, Mud Cross, Lower Pipe Rams w/3-1/2" x
6" Variable Rams.
14:30 - 15:30 1.00 BOPSURP INT1 R I U Test Joint and Equipment to Pressure Test BOPE.
15:30 -19:30 4.00 BOPSURP INT1 Held PJSM. Tested BOPE. Tested Upper and Lower Rams,
Blind Rams, Stand Pipe Manifold, Choke Manifold, Valves,
HCR, Kill Line, Choke Line, Floor Valves and IBOP to 4,000 psi
High /250 psi Low. Tested Annular Preventer to 2,500 psi High
1250 psi Low. All Tests Held f/5 Min. All Pressure Tests Held
w/ No Leaks or Pressure Loss. Witnessing of BOPE test
Waived by AOGCC Rep Chuck Scheve.
19:30 - 20:30 1.00 BOPSURP INT1 RID BOPE Test Equipment. Ran and Set Wear Bushing.
20:30 - 21 :00 0.50 BOPSUR P INT1 Closed Blind Rams. Tested Casing to 1,000 psi to Ensure TAM
Port Collar Closed. OK. Bled Off Pressure, Opened Blind
Rams.
21 :00 - 23:30 2.50 DRILL P INT1 M I U 60 Jts of 5" DP, Stood Back in Derrick.
23:30 - 00:00 0.50 DRILL P INT1 Held PJSM. R / U Equipment to M / U BHA #3.
9/10/2002 00:00 - 02:00 2.00 DRILL P INT1 Held PJSM. M I U BHA #3. 9-7/8" Hycalog DS-70 PDC Bit,
Ser# 200895, dressed w/6x15 jets, 7" SperryDrill Lobe 7/86.0
stg Motor wI 1.22 deg Bent Housing, Adjustable Gauge
Stabilizer, FEMWD w/ Hcim-GR-Res-PWD, FEMWD wI PM,
Hang Off Sub, 3 x Flex Collars, 9 Jts 5" HWDP, HE Drilling
Jars and 5 Jts 5" HWDP. Total BHA Length - 630.59'. Set
Motor Bend and Oriented to MWD. M / U Top Drive and Tested
MWD Tools, OK.
02:00 - 03:00 1.00 DRILL P INT1 Held PJSM. Slipped and Cut Drilling Line.
03:00 - 04:00 1.00 DRILL P INn RIH wI 9-7/8" Directional BHA on 5" DP to 1,150'. Picked up
Printed: 913012002 9:18:00 AM
")
mPE)(PLORA TI.ON
~:pérélli(;)n$
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-114
S-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
9/3/2002
Spud Date: 9/4/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
9/1 0/2002 03:00 - 04:00 1.00 DRILL P INT1 Single Joints of DP from Pipe Shed. Slowly Rotated Bit and
Stabilizer Through TAM Port Collar at 1,029'.
04:00 - 04:30 0.50 CASE P INT1 Held PJSM. Closed Pipe Rams and Pressure Tested Casing to
1,000 psi to Ensure TAM Port Collar Closed. OK. Bled Off
Pressure and Opened Pipe Rams.
04:30 - 08:30 4.00 DRILL P INT1 RIH wI 9-7/8" Directional BHA on 5" DP to 6,047'. Picked up
Single Joints of DP from Pipe Shed. Filled Pipe every 30
Joints. Tagged Cement at 6,047'.
08:30 - 09:00 0.50 CASE P INT1 Held PJSM. Closed Upper Pipe Rams. Tested 10-3/4" Surface
Casing to 3,500 psi fl 30 minutes, OK. Bled off Pressure,
Opened Pipe Rams.
09:00 - 09:30 0.50 DRILL P INT1 Drilled Cement and Float Equipment from 6,047' to 6,141'.
WOB 12,000# -15,000#, RPM 50, Motor RPM 174, Torque
10,000 ft Ilbs, Pump Rate 600 gpm, SPP 2,250 psi. Cleaned
out to 6,155'. Displaced Hole to New 9.3 ppg LSND Mud During
Drilling Out Operations.
09:30 - 10:00 0.50 DRILL P INT1 Drilled New 9-7/8" Hole 6,155' to 6,175'. WOB 10,000#-
12,000#, RPM 50, Motor RPM 174, Torque 10,000 ft Ilbs,
Pump Rate 600 gpm, SPP 2,250 psi.
10:00 - 10:30 0.50 DRILL P INT1 Circulated to Condition Hole and to Complete Mud
Displacement. Pump Rate 600 gpm, SPP 2,250 psi.
10:30 - 11 :00 0.50 DRILL P INT1 Held PJSM. Closed Pipe Rams and Performed LOT.
Strokes Pmp'd Pressure
5 180 psi
10 430 psi
15 610 psi
20 740 psi
25 860 psi
30 970 psi
35 1,070 psi
39 1,100 psi
40 1,100 psi
41 1 ,10° psi
MW 9.4 ppg, Csg Shoe TVD 3,375', Pressure 1,100 psi =
15.67 ppg EMW. Held Pressure f/1 0 minutes, Pressure
Leaked off from 1,100 psi to 640 psi in 5 minutes. Pressure at
10 minutes 640 psi. Bled down Pressure, Opened Pipe Rams.
11 :00 - 00:00 13.00 DRILL P INT1 Drilled 9-7/8" Directional Hole by Rotating and Sliding from
6,175' to 8,050'. WOB Sliding 15,000# - 20,000#, WOB
Rotating 5,000# -15,000#, RPM 70, Motor RPM 175, Torque
Off Bottom 11,000 ft Ilbs - On Bottom 15,000 ft Ilbs, Pump
Rate 650 gpm, SPP Off Bottom 2,300 psi, On Bottom 2,500
psi. String Weight Up 182,000#, String Weight Down 85,000#,
String Weight Rotating 125,000#. ART = 5.12 hrs, AST = 1.64
hrs. Pumped 30 bbl Hi-Vis Weighted Barafiber Sweeps every
200'.
9/11/2002 00:00 - 01 :00 1.00 DRILL P INT1 Held PJSM. Drilled 9-7/8" Directional Hole by Rotating and
Sliding from 8,050' to 8,197'. WOB Sliding 15,000# - 20,000#,
WOB Rotating 10,000# -15,000#, RPM 70, Motor RPM 175,
Torque Off Bottom 12,000 ft Ilbs - On Bottom 15,000 ft /Ibs,
Pump Rate 650 gpm, SPP Off Bottom 2,300 psi, On Bottom
2,500 psi. String Weight Up 185,000#, String Weight Down
85,000#, String Weight Rotating 125,000#.
Printed: 913012002 9: 18:00 AM
ßP<E:XPLOAATION
OpE!ration$SummaryReport
Page6öf 16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-114
S-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
9/3/2002
Spud Date: 9/4/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
9/11/2002 01 :00 - 02:00 1.00 DRILL P INT1 Pumped and Circulated Around 35 bbl Hi-Vis Weighted
Barafiber Sweep. Pump Rate 650 gpm, SPP 2,300 psi.
Circulated until Returns over Shaker Cleaned Up.
02:00 - 04:30 2.50 DRILL P INT1 Held P JSM. Made Wiper Trip from 8,197' to 10-3/4" Casing
Shoe at 6,155'. Tight Hole at 7,860', Maximum Overpull
75,000#, Average Drag 25,000#. Hole Tight at 7,770', Pumped
out of the Hole from 7,770' to 7,050'. Pump Rate 500 gpm,
SPP 2,000 psi. Drag Increased to 50,000# at 7,050'. Back
Reamed out of the Hole from 7,050' to 6,155'.
04:30 - 05:00 0.50 DRILL P INT1 Circulated Bottoms Up to Clean Hole After Wiper Trip. Pump
Rate 650 gpm, SPP 2,300 psi.
05:00 - 07:00 2.00 DRILL P INT1 RIH after Wiper Trip to 8,100'. Hit Bridge at 6,870'. Worked
through Bridge with Pump and Slight Rotation. M 1 U Top Drive,
Washed Down as a Precaution from 8,100' to 8,197'.10' of Fill
on Bottom.
07:00 - 16:30 9.50 DRILL P INT1 Drilled 9-7/8" Directional Hole by Rotating and Sliding from
8,197' to 9,252'. WOB Sliding 25,000# - 35,000#, WOB
Rotating 15,000# - 25,000#, RPM 90, Motor RPM 175, Torque
Off Bottom 17,000 ft Ilbs - On Bottom 20,000 ft Ilbs, Pump
Rate 650 gpm, SPP Off Bottom 2,750 psi, On Bottom 2,950
psi. String Weight Up 225,000#, String Weight Down 85,000#,
String Weight Rotating 125,000#. Pumped 30 bbl Hi-Vis
Weighted Barafiber Sweeps every 300'.
16:30 - 17:30 1.00 DRILL P INT1 Pumped and Circulated Around 30 bbl Hi-Vis Weighted
Barafiber Sweep. Pump Rate 650 gpm, SPP 2,750 psi.
Circulated until Returns over Shaker Cleaned Up.
17:30 -19:00 1.50 DRILL P INT1 Held PJSM. Made Wiper Trip from 9,252' to 7,850'. Maximum
Overpull125,OOO#, Average Drag 75,000#. Hole became Very
Tight at 8,400', Pumped and Back Reamed out of the Hole
from 8,400' to 8,150'. Pump Rate 600 gpm, SPP 2,300 psi.
Straight Pull from 8,150' to 7850'. No Overpull, Drag 30,000#.
19:00 - 20:00 1.00 DRILL P INn RIH after Wiper Trip to 9,160'. Drag 25,000# - 30,000#. M 1 U
Top Drive, Washed Down as a Precaution from 9,160' to
9,252'. No Fill.
20:00 - 00:00 4.00 DRILL P INT1 Drilled 9-7/8" Directional Hole by Rotating and Sliding from
9,252' to 9,720'. WOB Sliding 15,000# - 25,000#, WOB
Rotating 10,000# - 20,000#, RPM 90, Motor RPM 175, Torque
Off Bottom 15,000 ft Ilbs - On Bottom 18,000 ft Ilbs, Pump
Rate 650 gpm, SPP Off Bottom 2,750 psi, On Bottom 2,950
psi. String Weight Up 235,000#, String Weight Down 85,000#,
String Weight Rotating 135,000#. ART = 6.68 hrs, AST = 2.03
hrs. Pumped 30 bbl Hi-Vis Weighted Barafiber Sweeps every
300'.
9/12/2002 00:00 - 04:00 4.00 DRILL P INT1 Held PJSM. Drilled 9-7/8" Directional Hole by Rotating and
Sliding from 9,720' to 10,211'. WOB Sliding 20,000# - 25,000#,
WOB Rotating 10,000# - 20,000#, RPM 90, Motor RPM 175,
Torque Off Bottom 14,000 ft Ilbs - On Bottom 17,000 ft Ilbs,
Pump Rate 650 gpm, SPP Off Bottom 2,650 psi, On Bottom
2,950 psi. String Weight Up 215,000#, String Weight Down
85,000#, String Weight Rotating 135,000#. Pumped 30 bbl
Hi-Vis Barafiber Sweeps every 300'.
04:00 - 05:00 1.00 DRILL P INT1 Pumped and Circulated Around 30 bbl Hi-Vis Weighted
Barafiber Sweep. Pump Rate 650 gpm, SPP 2,650 psi.
Printed: 913012002 9:18:00 AM
')
BPEXPLORA TION
OperationsSu mmaryReport
Page 7of16
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-114
S-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
9/3/2002
Spud Date: 9/4/2002
End:
Date From - To Hours Task Code NPT Phase Description of Operations
9/12/2002 05:00 - 05:30 0.50 DRILL P INT1 Held PJSM. Made Wiper Trip from 10,210' to 9,150'. No
Overpull, Average Drag 20,000#.
05:30 - 06:00 0.50 DRILL P INT1 RIH after Wiper Trip from 9,150' to 10,120'. Average Drag
20,000#. M I U Top Drive and Washed Down as a Precaution
from 10,120' to 10,211'. No Fill On Bottom.
06:00 - 00:00 18.00 DRILL P INT1 Held PJSM. Drilled 9-7/8" Directional Hole by Rotating and
Sliding from 10,211' to 11,845'. WOB Sliding 15,000#-
35,000#, WOB Rotating 8,000# - 20,000#, RPM 90, Motor
RPM 175, Torque Off Bottom 12,500 ft Ilbs - On Bottom
17,500 ft Ilbs, Pump Rate 660 gpm, SPP Off Bottom 2,950
psi, On Bottom 3,200 psi. String Wgt Up 200,000#, String Wgt
Down 105,000#, String Weight Rotating 145,000#. Pmpd 30
bbl Hi-Vis Sweeps every 250'. AST = 2.65 hrs, ART = 10.42
hrs.
9/13/2002 00:00 - 03:00 3.00 DRILL P INT1 Held PJSM. Drilled 9-7/8" Directional Hole by Rotating and
Sliding from 11,845' to 12,217'. WOB Sliding 40,000# -
45,000#, WOB Rotating 20,000# - 35,000#, RPM 90, Motor
RPM 175, Torque Off Bottom 14,000 ft Ilbs - On Bottom
17,000 ft Ilbs, Pump Rate 650 gpm, SPP Off Bottom 2,950
psi, On Bottom 3,200 psi. String Weight Up 210,000#, String
Weight Down 115,000#, String Weight Rotating 145,000#.
Pumped 30 bbl Hi-Vis Weighted Sweeps every 300'. ART =
1.83 hrs, AST = 0.08 hrs.
03:00 - 04:00 1.00 DRILL P INT1 Pumped and Circulated Around 30 bbl Hi-Vis Weighted
Barafiber Sweep. Pump Rate 660 gpm, SPP 2,900 psi.
Circulated until Returns over Shaker were Clean.
04:00 - 06:30 2.50 DRILL P INT1 Held PJSM. POOH wI 5" DP from 12,217' to 10-3/4" Casing
Shoe at 6,140'. No Overpull, Maximum Drag 45,000#, Average
Drag 30,000#.
06:30 - 07:30 1.00 DRILL P INT1 Held PJSM. Slipped and Cut Drilling Line.
07:30 - 08:00 0.50 DRILL P INT1 Serviced Top Drive
08:00 - 09:30 1.50 DRILL P INT1 Pumped and Circulated around 30 bbl1 0% EP Mud Lube
Sweep. Parameters Before Lube Pill: String Weight Up
160,000#, String Weight Down 105,000#, RPM 70, Torque
6,000 ft Ilbs; Parameters After Lube Pill: String Weight Up
135,000#, String Weight Down 105,000#, RPM 70, Torque
6,000 ft Ilbs.
09:30 - 11 :30 2.00 DRILL P INT1 POOH wI 5" DP from 6,140' to 600'
11:30 -12:30 1.00 DRILL P INT1 POOH wI BHA
12:30 -13:00 0.50 DRILL P INT1 Downloaded MWD Data.
13:00 - 16:00 3.00 DRILL P PROD1 Held PJSM. M I U BHA #4. 9-7/8" Smith S-73HPX PDC Bit,
Ser# JS8361, dressed w/8x13 jets, 7" SperryDrill Lobe 7/8 6.0
stg Motor wI 1.22 deg Bent Housing, Adjustable Gauge
Stabilizer, FEMWD wI Hcim-GR-Res-PWD, FEMWD wI PM,
SFD - CTN, Hang Off Sub, 3 x Flex Collars, 9 Jts 5" HWDP,
HE Drilling Jars and 5 Jts 5" HWDP. Total BHA Length -
658.38'. Changed out MWD Pulser. Oriented Motor to MWD. M
I U Top Drive and Tested MWD Tools, OK.
16:00 - 16:30 0.50 DRILL P PROD1 Held PJSM. Cleared Rig Floor, Sperry-Sun installed
Radioactive Sources, RIH wI MWD Tools below BOP Stacie
Sounded the All Clear. M I U and RIH wI 5" HWDP.
16:30 - 17:30 1.00 DRILL P PROD1 RIH wI 9-7/8" Directional BHA on 5" DP. PI U Single Joints of
5" DP from Pipe Shed.
Printed: 913012002 9: 18:00 AM
BP EXPLORATION
Qpe~~~iòn~r.Sumtnary,...i.Repørt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
S-114
S-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
9/3/2002
Spud Date: 9/4/2002
End:
Date From - To Hours Task Code .NPT Phase Description. of Operations
9/13/2002 17:30 - 20:00 2.50 DRILL N RREP PROD1 Worked on Top Drive Electrical Fault.
20:00 - 22:00 2.00 DRILL P PROD1 RIH wI 9-7/8" Directional BHA on 5" DP to 3,630'. PI U Single
Joints of 5" DP from Pipe Shed.
22:00 - 00:00 2.00 DRILL P PROD1 RIH wI 9-7/8" Directional BHA on 5" DP to 6,504'
9/14/2002 00:00 - 02:30 2.50 DRILL P PROD1 Held PJSM. RIH wI 9-7/8" Directional BHA on 5" DP to 11,965'.
Broke Circulation at 8,200' and 10,200'. Drag 25,000#.
02:30 - 05:30 3.00 DRILL P PROD1 Performed MAD Pass to Log Interval from 11,900' to 11,650'.
Rate 180' I hr, RPM 40, Pump Rate 600 gpm, SPP 3,000 psi.
05:30 - 06:00 0.50 DRILL P PROD1 RIH wI Directional BHA on 5" DP to 12,130'. M I U Top Drive,
Washed Down as a Precaution from 12,130' to 12,217.
06:00 - 12:30 6.50 DRILL P PROD1 Drilled 9-7/8" Directional Hole by Rotating and Sliding from
12,217' to 13,018'. WOB Sliding 15,000# - 20,000#, WOB
Rotating 10,000# - 20,000#, RPM 90, Motor RPM 175, Torque
Off Bottom 17,500 ft Ilbs - On Bottom 18,000 ft Ilbs, Pump
Rate 650 gpm, SPP Off Bottom 3,150 psi, On Bottom 3,300
psi. String Weight Up 225,000#, String Weight Down 115,000#,
String Weight Rotating 150,000#. Pumped 30 bbl Hi-Vis
Sweeps every 300'. ART = 3.05 hrs, AST = 0.74 hrs.
12:30 - 14:00 1.50 DRILL N DPRB PROD1 Hole Packed off Around Drill String, Lost Circulation. Shut
Down Pumps, Hole Static. Losses while Pumping 5 bpm, 140
bph. Pulled out of the Hole from 13,018' to 12,850'. Hole Static.
POOH to 12,450', Hole gave Fluid Back. Back Reamed out of
Hole from 12,450' to 12,350', Pump Rate 5 bpm, RPM 50,
Torque 16,000 ft Ilbs. Established Drilling Rate Parameters,
Regained Full Circulation. Mixed LCM Material at 2 sacks I
Minute, OM Seal and Barafiber.
14:00 - 15:30 1.50 DRILL N DPRB PROD1 Mixed LCM Material at 1 sack I minute, Began Pump Rate at
175 gpm, SPP 890 psi, After Establishing Full Returns, Slowly
Increased Pump Rate to 650 gpm, SPP 3,030 psi. Observed
Abundant Cuttings Returned over Shaker.
15:30 - 17:30 2.00 DRILL N DPRB PROD1 Washed and Reamed Back to Bottom to Clean Hole. Full
Circulation, Pump Rate 650 gpm, SPP 3,000 psi.
17:30 - 00:00 6.50 DRILL P PROD1 Drilled 9-7/8" Directional Hole by Rotating and Sliding from
13,018' to 13,593'. WOB Sliding 35,000# - 45,000#, WOB
Rotating 10,000# - 25,000#, RPM 90, Motor RPM 175, Torque
Off Bottom 17,000 ft Ilbs - On Bottom 20,000 ft Ilbs, Pump
Rate 650 gpm, SPP Off Bottom 2,950 psi, On Bottom 3,250
psi. String Weight Up 225,000#, String Weight Down 122,000#,
String Weight Rotating 150,000#. Pumped 25 bbl Hi-Vis
Sweeps every 250'. ART = 2.47 hrs, AST = 1.69 hrs.
9/15/2002 00:00 - 05:00 5.00 DRILL P PROD1 Held PJSM. Drilled 9-7/8" Directional Hole by Rotating and
Sliding from 13,593' to 14,168'. WOB Sliding 15,000#-
20,000#, WOB Rotating 5,000# -10,000#, RPM 90, Motor
RPM 175, Torque Off Bottom 16,000 ft Ilbs - On Bottom
17,000 ft Ilbs, Pump Rate 650 gpm, SPP Off Bottom 3,050
psi, On Bottom 3,250 psi. String Weight Up 225,000#, String
Weight Down 122,000#, String Weight Rotating 160,000#.
05:00 - 06:30 1.50 DRILL P PROD1 Pumped and Circulated Around 25 bbl Hi-Vis Barafiber Sweep,
Pump Rate 650 gpm, SPP 3,100 psi. Circulated Until Returns
over Shaker were Clean.
06:30 - 07:30 1.00 DRILL P PROD1 Held PJSM. Made Wiper Trip from 14,168' to 12,157'. No
Overpull, Average Drag 30,000#.
07:30 - 08:30 1.00 DRILL P PROD1 RIH after Wiper Trip from 12,157' to 14,072'. Average Drag
Printed: 913012002 9:18:00 AM
BP EXPLORATION Page 9 Oft6
OperationsSumniary .Report
Legal Well Name: S-114
Common Well Name: S-114 Spud Date: 9/4/2002
Event Name: DRILL +COMPLETE Start: 9/3/2002 End:
Contractor Name: DOYON Rig Release:
Rig Name: DOYON 14 Rig Number: 14
Date From - To Hours Task Code NPT Phase Description of Operations
9/15/2002 07:30 - 08:30 1.00 DRILL P PROD1 20,000#. M 1 U Top Drive and Washed Down as a Precaution
from 14,072' to 14,168'. No Fill On Bottom.
08:30 - 12:00 3.50 DRILL P PROD1 Drilled 9-7/8" Directional Hole by Rotating and Sliding from
14,168' to 14,470'. WOB Sliding 10,000# - 20,000#, WOB
Rotating 5,000# - 8,000#, RPM 90, Motor RPM 175, Torque Off
Bottom 17,000 ft Ilbs - On Bottom 17,000 ft Ilbs, Pump Rate
660 gpm, SPP Off Bottom 3,000 psi, On Bottom 3,300 psi.
String Weight Up 225,000#, String Weight Down 115,000#,
String Weight Rotating 165,000#. Pumped 20 bbl Hi-Vis
Sweeps every 300'. AST = 2.00 hrs, ART = 3.82 hrs.
12:00 - 00:00 12.00 DRILL P PROD1 Held PJSM. Drilled 9-7/8" Directional Hole by Rotating and
Sliding from 14,470' to 14,890'. WOB Sliding 15,000# -
35,000#, WOBRotating 5,000# -10,000#, RPM 90, Motor
RPM 175, Torque Off Bottom 16,000 ft Ilbs - On Bottom
17,500 ft Ilbs, Pump Rate 650 gpm, SPP Off Bottom 3,150
psi, On Bottom 3,400 psi. String Weight Up 225,000#, String
Weight Down 120,000#, String Weight Rotating 175,000#.
Pumped 25 bbl Hi-Vis Sweeps every 300'. AST = 6.48 hrs,
ART = 0.33 hrs.
Note: Increased MW to 10.1 ppg
9/16/2002 00:00 - 12:00 12.00 DRILL P PROD1 Held PJSM. Drilled 9-7/8" Directional Hole by Sliding from
14,890' to 15,185'. WOB 10,000# - 20,000#, Motor RPM 175,
Pump Rate 650 gpm, SPP Off Bottom 3,200 psi, On Bottom
3,500 psi. String Weight Up 235,000#, String Weight Down
140,000#. Washed and Reamed every 45' to Clean the Hole.
Pumped 25 bbl Hi-Vis Sweeps every 2 hrs. AST = 9.59 hrs.
12:00 - 19:00 7.00 DRILL P PROD1 Held PJSM. Drilled 9-7/8" Directional Hole by Rotating and
Sliding from 15,185' to 15,603'. WOB Sliding 15,000# - .
25,000#, WOB Rotating 5,000# -15,000#, RPM 90. Motor
RPM 175, Torque Off Bottom 17,000 ft Ilbs - On Bottom
18,500 ft Ilbs, Pump Rate 650 gpm, SPP Off Bottom 3,500
psi, On Bottom 3,750 psi. String Weight Up 260,000#. String
Weight Down 140,000#, String Weight Rotating 185.000#.
Pumped 25 bbl Hi-Vis Sweeps every 300'. AST = 1.58 hrs.
ART = 2.74 hrs.
Decision Made to Plug Back and Sidetrack Well Due to
Formations coming in High and Possibility of Drilling into Gas
Cap.
19:00 - 21:00 2.00 DRILL C PROD1 Pumped and Circulated Around 30 bbl Hi-Vis Barafiber Sweep.
Pump Rate 620 gpm, SPP 3,500 psi. Circulated until Returns
over Shaker were Clean. Flow Checked Well, Well Static.
21 :00 - 00:00 3.00 DRILL C PROD1 POOH from 15,503' to 11,300'. Maximum Overpull100,OOO# at
15,440'. Average Drag 25,000#. Tight Spot at 11,300'. M 1 U
Top Drive, Back Reamed Out of the Hole from 11,300' to
11,100'. Pump Rate 585 gpm, SPP 2,800 psi, RPM 55, Torque
13,000 ft Ilbs, String Weight Rotating Up 145,000#. POOH
from 11,100' to 11,000', No Overpull, Average Drag 20,000#.
9/17/2002 00:00 - 02:00 2.00 DRILL C PROD1 Held PJSM. POOH from 11,000' to 10-3/4" Casing Shoe at
6,140'. No Overpull, Average Drag 20,000#.
02:00 - 03:00 1.00 DRILL C PROD1 Held PJSM. Slipped and Cut Drilling Line.
03:00 - 04:30 1.50 DRILL C PROD1 Continued to POOH wI 5" DP from 6,140' to 650'. Average
Drag 10,000#.
04:30 - 06:30 2.00 DRILL C PROD1 POOH wI 9-718" Directional BHA. Broke out and LID 5"
Printed: 913012002 9:18:00 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
)
"),
BPEXPLORATION
Operati~11S .SlImmar-yRèpQrt
8-114
8-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
8pud Date: 9/4/2002
End:
9/3/2002
Date From - To Hours Task Code NPT Phase Description of Operations
9/17/2002 04:30 - 06:30 2.00 DRILL C PROD1 HWDP and Jars. Remove RA source and LD remaining BHA.
06:30 - 07:00 0.50 DRILL C PROD1 LD tools and clear rig floor.
07:00 - 12:00 5.00 BOPSUR C PROD1 Pull Wear bushing and install test plug. Test BOPE to 250 psi
low / 5 min & 4000 psi high / 5 min. Test annular to 250 psi low
/ 5 min & 3000 psi high / 5 min. Witness of test waived by
AGOCC John Crisp. Pull test plug and install wear bushing.
RD test equipment.
12:00 - 20:00 8.00 STKOH C PROD1 MU mule shoe. TIH to casing shoe and break circulation, 420
gpm, 600 psi. Continue TIH break circulation every 20 stands
toTO.
20:00 - 23:30 3.50 STKOH C PROD1 Circulate and condition mud for bottom cement plug. Bring
cirulation rate up to 600 gpm, losing mud. Circulate@ 550
gpm, 1800 psi. 100 RPM, TQ 15 K, PU wt = 260 K, SO wt =
125 K. Condition mud to 10.2 ppg, 47 vis. TO up to 25 K.
Stop rotation, circulate and reciprocate pipe. Batch mix 70 bbls
15.8 ppg cement plug.
23:30 - 00:00 0.50 STKOH C PROD1 RU to pump cement. Pump 5 BW. Test lines to 3500 psi.
Pump 30 BW. Pump 70 bbls 15.8 ppg cement @ 6.5 bpm,
1000 psi. Displace with 7.5 BW. Switch to rig pump and
displace with 246 bbls 10.2 mud. Reciprocate pipe during
cement job. TQ = 24 K, PU wt = 290 K, SO wt = 125 K. 100%
returns.
9/18/2002 00:00 - 00:30 0.50 STKOH C PROD1 Continue cement displacement @ 9 bpm, 1120 psi. PU wt =
300 K, SO wt = 125 K. Cement in place @ 00:30 hrs.
00:30 - 01 :00 0.50 STKOH C PROD1 POOH slow (approx 3.5 min per stand) to 14950'. PU wt = 280
K.
01 :00 - 03:30 2.50 STKOH C PROD1 Circulate out excess cement @ 9 bpm, 1100 psi. Build 11.0
ppg spacer in pits. Returns - PH up, MW up to 10.5 ppg.
03:30 - 05:00 1.50 STKOH C PROD1 Spot 11.0 ppg spacer f/14950' - 12050' @ 10 bpm, 1140 psi.
PU wt = 260 K, SO = 120 K. Rotate & Reciprocate pipe. TO =
25 K.
05:00 - 06:00 1.00 STKOH C PROD1 POOH to 12800'. PU wt = 275 K.
06:00 - 07:30 1.50 STKOH C PROD1 Circulate btms up @ 600 gpm, 1750 psi. 11.0 ppg mud on
bottom up. Rotate & reciprocate pipe. 80 rpm.
07:30 - 09:00 1.50 STKOH C PROD1 Pump balanced Form A plug pill with Dowell, Pmp 30 bbls
10.7 ppg viscosified fresh water pill. Pump 30 bbls Form A
Plug and follow with 5 bbls 10.7 ppg pill. Displace with 206
bbls 10.2 ppg mud @ 600 gpm, 1750 psi. Rotate and
reciprocate pipe. 80 rpm. PU wt = 235 K, SO = 105 K, ROT =
148 K.
09:00 - 09:30 0.50 STKOH C PROD1 POOH slowly (3.5 min / stand) to 12400'.
09:30 - 10:00 0.50 STKOH C PROD1 Pump 50 bbls mud to clear DP and 25 bbl dry job.
10:00 - 12:30 2.50 STKOH C PROD1 POOH to 10.75" casing shoe @ 6140'.
12:30 - 14:30 2.00 STKOH C PROD1 Wait on Form A Plug to set. Perform Rig Maintenance and
work on Top Drive.
14:30 - 16:30 2.00 STKOH C PROD1 RIH to 12300'.
16:30 - 17:30 1.00 STKOH C PROD1 Circulate @ 1 bpm, 230 psi while washing down to find top of
plug. Tag top of plug @ 12450'
17:30 - 18:30 1.00 STKOH C PROD1 Circulate bottoms up @ 600 gpm, 1450 psi. Rotate and
reciprocate pipe. Confirm top of plug with bottoms up.
18:30 - 19:00 0.50 STKOH C PROD1 Wash down to 12600'.
19:00 - 20:30 1.50 STKOH C PROD1 Circulate and condition mud for Kick-off cement plug. @ 600
gpm, 1580 psi. Hold PJSM with rig crew and cementers.
Printed: 913012002 9:18:00 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
IBPEXPLORAlBlON
0p.era~ionsSummøI1YReport
Page 11 of16
S-114
8-114
DRILL +COMPLETE
DOYON
DOYON 14
Start:
Rig Release:
Rig Number: 14
Spud Date: 9/4/2002
End:
9/3/2002
From-To Hours Task GodeNPT
9/18/2002
19:00 - 20:30
20:30 - 21 :30
21 :30 - 22:30
22:30 - 23:00
23:00 - 00:00
Description of Operations
1.50 STKOH C
1.00 STKOH C
PROD1
PROD1
Batch mix cement.
RU for cement. Pump 5 BW. Test lines to 3500 psi. Pump 30
BW. Pump 51 bbsl (245 sxs) 15.8 ppg Kick-off cement, 1.17
ft^3 I sx yeild, 5.085 gall sx. Follow with 5 BW. RD cement
head. NU Top Drive. Displace balanced plug with 198 bbls,
10.2 ppg mud @ 550 gpm, 1470 psi. Rotate and reciprocate
pipe. PU wt = 300 K, 80 rpm, 25 K TQ. Cement plug in place
@21 :30 Hrs, 09/18/2002. 100% returns.
POOH slowly ( approx 3.5 min per stand) 10 stands to 11650'.
Pump DP volume to clear pipe @ 550 gpm, 1450 psi. Flow
check. Pump dry job.
POOH for Kick-Off BHA #5.
1.00 STKOH C
0.50 STKOH C
PROD1
PROD1
1.00 STKOH C
PROD1
S - J I v( A- 0 P í
)
)
~œ-/7S
16-0ct-02
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well S-114 Gyro
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00 I MD
, M D (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment( s)
RECe\Vec
OCT 1 7 2002
AI" or¡ & Gal Coni. commiIfIiOn
AndØ89t
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
PBU _.WOA 5 Pad
5-11'4 Gyro
Job No. AKF022152, Surveyed: 16 September, 2002
Survey Report
15 October, 2002
Your Ref: API 500292311600
Surface Coordinates: 5980820.17 H, 618929.73 E (70021' 22.5075"H, 149002' 02.8406" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 980820.17 H, 118929.73 E (Grid)
Surface Coordinates relative to Structure Reference: 52.14 S, 1012.31 E(True)
Kelly BushIng: 70.2Oft above Mean Sea Level
Elevation relative to Project V Reference: 70.20ft
Elevation relative to Structure Reference: 70.20ft
Sper-a"")/-IIUI!
DA1LLINÖ S..AVIt:.eS
A Halliburton Company
D "81!IIF ~ ~.'-r VE
... : ¡ ~ ~ i j . ..
~'
Survey Ref: 5vy11305
Sperry-Sun Drilling Services
Survey Report for PBU_WOA8 Pad - 8-114 Gyro
Your Ref: AP/500292311600
Job No. AKF022152, Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (01100ft)
0.00 0.000 0.000 -70.20 0.00 O.OON O.OOE 5980820.17 N 618929.73 E 0.00 Tolerable Gyro
150.90 0.250 20.000 80.70 150.90 0.31 N 0.11 E 5980820.48 N 618929.84 E 0.166 0.03
240.00 0.500 310.000 169.80 240.00 0.74N 0.12W 5980820.91 N 618929.60 E 0.535 0.42
330.40 1.500 299.000 260.18 330.38 1.57 N 1.46 W 5980821.72 N 618928.25 E 1.121 1.98
420.40 3.350 284.000 350.10 420.30 2.78N 5.04W 5980822.87 N 618924.65 E 2.156 5.74
509.95 6.200 274.000 439.33 509.53 3.75N 12.40W 5980823.72 N 618917.27 E 3.304 12.82 ~>
600.41 9.200 283.000 528.97 599.17 5.71 N 24.32 W 5980825.50 N 618905.32 E 3.564 24.45
689.93 12.100 289.000 616.94 687.14 10.38 N 40.17 W 5980829.91 N 618889.40 E 3.464 40.79
785.76 13.500 293.000 710.39 780.59 18.02 N 59.97 W 5980837.24 N 618869.48 E 1.728 61.95
881.81 16.250 293.000 803.21 873.41 27.65 N 82.66 W 5980846.51 N 618846.64 E 2.863 86.59
977.41 17.750 288.800 894.63 964.83 37.58 N 108.77 W 5980856.02 N 618820.38 E 2.027 114.45
1072.95 19.500 291 .100 985.17 1055.37 48.01 N 131.44 W 5980866.00 N 618791.55 E 1.986 144.83
1169.45 20.000 289.000 1075.99 1146.19 59.18 N 168.07 W 5980816.68 N 618760.74 E 0.899 177.31
1265.86 22.000 289.310 1165.99 1236.19 70.52 N 200.70 W 5980887.50 N 618727.93 E 2.078 211.68
1364.98 25.000 285.750 1256.89 1327.09 82.35 N 238.39 W 5980898.13 N 618690.06 E 3.347 250.83
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 295.070° (True).
Magnetic Declination at Surface is 25.9600(07-Sep-02}
Based upon Minimum Curvature type calculations, at a Measured Depth of 1364.98ft.,
The Bottom Hole Displacement is 252.22ft., in the Direction of 289.057° (True).
~.
15 October, 2002 - 13:21
Page 2 of 3
DrillQlIest 3.03.02.002
North Slope Alaska
Survey taallJraøram far 5-114 Gvro
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
15 October, 2002 ~ 13:21
To
Measured Vertical
Depth Depth
(ft) (ft)
Sperry-Sun Drilling Services
Survey Report for PBU_WOA 5 Pad - 5-114 Gyro
Your Ref: AÞ/500292311600
Job No. AKF022152, Surveyed: 16 September, 2002
BPXA
Survey Tool Description
0.00
1364.98
1327.09 Tolerable Gyro
,-7~~
~'
Page 3 of 3
DrillQuest 3.03.02.002
)
)
d-~-/75
16-0ct -02
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well S-114 IIFR
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
, M D (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment( s)
OCT 1 7 2002
Alaeka Oil & Gas Cons. Comnûa8ion
Anchorage
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
PBU_WOAS Pad
S-114
Job No. AKZZ22152, Surveyed: 16 September, 2002
Survey Report
15 October, 2002
Your Ref: API 500292311600
Surface Coordinates: 5980820.17 N, 618929.73 E(70° 21' 22.5075" N, 149002' 02.8406" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 980820.17 N, 118929.73 E (Grid)
Surface Coordinates relative to Structure Reference: 52.14 S, 1012.31 E(True)
Kelly Bushing: 70.20ft above Mean Sea Level
Elevation relative to Project V Reference: 70.20ft
Elevation relative to Structure Reference: 70.20ft
snfllra.-.y-su.,
Df:t)LLtNG S'.AVtc:eS
A Halliburton Company
JE
'i }\" 'v u-
t , I, .-
\IT¡ -
~'
~:
Survey Ref: svy11336
Sperry-Sun Drilling Services
Survey Report for PBU_WOAS Pad - S-114
Your Ref: AP15OlJ292311600
Job No. AKZZ22152, Surveyêd: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
1364.98 25.000 285.750 1256.89 1327.09 82.35 N 238.39 W 5980898.73 N 618690.06 E 250.83 AK-6 BP-'FR-AK
1488.20 29.100 288.070 1366.61 1436.81 98.72 N 291.96 W 5980914.24 N 618636.24 E 3.435 306.29
1584.00 35.590 286.780 1447.50 1517.70 114.01 N 340.85 W 5980928.16 N 618587.11 E 6.812 357.05
1679.15 36.290 284.870 1524.54 1594.74 129.23 N 394.58 W 5980943.12 N 618533.15 E 1.389 412.16
1775.58 42.100 284.830 1599.24 1669.44 144.84 N 453.46 W 5980957.79 N 618474.03 E 6.025 472.11
1872.94 46.070 283.870 1669.16 1739.36 161.61 N 519.07 W 5980973.52 N 618408.16 E 4.135 538.65 ~
1967.35 46.250 282.280 1734.56 1804.76 177.01 N 585.40 W 5980987.86 N 618341.60 E 1.230 605.25
2062.69 46.870 283.520 1800. 11 1870.31 192.47 N 652.87 W 5981002.25 N 618273.89 E 1.147 672.92
2157.95 46.500 282.660 1865.46 1935.66 208.17 N 720.38 W 5981016.87 N 618206.14 E 0.763 740.72
2254.01 48.070 281.330 1930.63 2000.83 222.82 N 789.41 W 5981030.43 N 618136.88 E 1.925 809.46
2349.89 48.160 284.950 1994.65 2064.85 239.05 N 858.90 W 5981045.55 N 618067.14 E 2.812 879.28
2444.46 48.370 286.680 2057.61 2127.81 258.28 N 926.80 W 5981063.10 N 617998.95 E 1.383 948.93
2539.77 50.280 287.830 2119.73 2189.93 279.73 N 995.82 W 5981084.05 N 617929.59 E 2.203 1020.53
2636.19 53.730 289.290 2179.07 2249.27 303.93 N 1067.83 W 5981107.11 N 617857.21 E 3.772 1096.02
2732.01 58.530 290.870 2232.46 2302.66 331.27 N 1142.52 W 5981133.26 N 617782.09 E 5.193 1175.25
2828.46 65.190 292.690 2277.93 2348.13 362.84 N 1221.43 W 5981163.58 N 617702.69 E 7.102 1260.11
2922.52 68.590 293.240 2314.84 2385.04 396.60 N 1301.08 W 5981196.06 N 617622.52 E 3.654 1346.55
3019.30 72.940 294.760 2346.72 2416.92 433.77 N 1384.52 W 5981231.90 N 617538.49 E 4.733 1437.89
3114.56 71 .430 297.210 2375.87 2446.07 473.49 N 1466.04 W 5981270.33 N 617456.36 E 2.917 1528.56
3211.07 70.340 298.580 2407.47 2477.67 516.15 N 1546.63 W 5981311.70 N 617375.10 E 1.753 1619.63
3304.92 73.090 298.190 2436.91 2507.11 558.51 N 1625.02 W 5981352.81 N 617296.04 E 2.957 1708.58
3400.88 74.090 298.460 2464.02 2534.22 602.18 N 1706.05 W 5981395.19 N 617214.33 E 1.076 1800.49
3496.99 74.530 298.050 2490.01 2560.21 645.98 N 1787.56 W 5981437.69 N 617132.14 E 0.615 1892.87
3593.05 74.340 298.080 2515.79 2585.99 689.52 N 1869.21 W 5981479.93 N 617049.81 E 0.200 1985.28 ~
3688.82 74.060 296.480 2541.87 2612.07 731.76 N 1951.11 W 5981520.86 N 616967.25 E 1.634 2077.36
3785.52 73.620 297.330 2568.78 2638.98 773.78 N 2033.94 W 5981561.57 N 616883.77 E 0.959 2170.19
3880.80 72.880 297.040 2596.24 2666.44 815.47 N 2115.09 W 5981601.95 N 616801.96 E 0.830 2261.37
3975.75 72.690 295.920 2624.34 2694.54 855.91 N 2196.27 W 5981641.10 N 616720.14 E 1.144 2352.03
4071.96 72.080 296.030 2653.46 2723.66 896.07 N 2278.71 W 5981679.95 N 616631.08 E 0.643 2443.72
4167. 1 0 71.000 295.460 2683.58 2753.78 935.27 N 2359.99 W 5981717.85 N 616555.19 E 1.269 2533.96
4264.15 71 . 150 295.400 2715.06 2785.26 974.69 N 2442.90 W 5981755.95 N 616471.66 E 0.165 2625.76
4359.46 72.400 295.450 2744.87 2815.07 1013.56 N 2524.66 W 5981793.52 N 616389.30 E 1.312 2716.28
4455.52 73.380 294.040 2773.13 2843.33 1051.98 N 2608.04 W 5981830.61 N 616305.32 E 1.735 2808.09
4551.11 73.540 294.530 2800.34 2870.54 1089.67 N 2691.56 W 5981866.97 N 616221.21 E 0.519 2899.71
4647.09 74.510 294.970 2826.76 2896.96 1128.30 N 2775.36 W 5981904.27 N 616136.81 E 1.103 2991.98
-...----
15 October, 2002 - 14:30 Page 2of7 DrillQlIest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PBU_WOA S Pad - S-114
Your Ref: API 500292311600
Job No. AKZZ22152, Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg V~rtical
Depth Inel. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
4741.52 73.200 295.010 2853.01 2923.21 1166.62 N 2857.57 W 5981941.27 N 616054.00 E 1.388 3082.69
4837.71 74.210 294.020 2880.00 2950.20 1204.92 N 2941.57 W 5981978.24 N 615969.40 E 1.442 3175.01
4933.87 72.530 294.250 2907.52 2977.72 1242.60 N 3025.65 W 5982014.57 N 615884.73 E 1.762 3267.13
5029.93 71.990 294.360 2936.79 3006.99 1280.25 N 3109.04 W 5982050.90 N 615800.76 E 0.573 3358.61
5125.62 72.250 294.070 2966.17 3036.37 1317.61 N 3192.09 W 5982086.93 N 615717.12 E 0.396 3449.67
295.080 2995.33 3065.53 1355.57 N .3275.12 W 5982123.58 N ,~
5221.46 72.330 615633.50 E 1.007 3540.96
5317.27 72.150 294.880 3024.55 3094.75 1394.11 N 3357.83 W 5982160.79 N 615550.19 E 0.274 3632.21
5413.31 71 .580 296.160 3054.45 3124.65 1433.43 N 3440.19 W 5982198.80 N 615467.22 E 1.399 3723.4 7
5509.87 71.940 295.490 3084.67 3154.87 1473.38 N 3522.74 W 5982237.43 N 615384.04 E 0.757 3815.17
5603.69 70.450 295.930 3114.91 3185.11 1511.90 N 3602.76 W 5982274.68 N 615303.42 E 1.649 3903.97
5700.17 69.260 295.820 3148.14 3218.34 1551.43 N 3684.25 W 5982312.91 N 615221.31 E 1.238 3994.54
5796.15 68.650 296.120 3182.60 3252.80 1590.66 N 3764.78 W 5982350.85 N 615140.17 E 0.699 4084,11
5891.62 68.500 298.140 3217.48 3287.68 1631.18 N 3843.87 W 5982390.12 N 615060.44 E 1.976 4172.92
5986.54 70.880 296.310 3250.43 3320.63 1671.89 N 3923.03 W 5982429.57 N 614980.65 E 3.091 4261.86
6082.42 71 .500 295.990 3281.34 3351.54 1711.89N 4004.50 W 5982468.27 N 614898.56 E 0.720 4352.61
6099.70 71.370 296.300 3286.84 3357.04 1719.11N 4019.20 W 5982475.25 N 614883.74 E 1.860 4368.98
6108.34 71.210 296.310 3289.62 3359.82 1722.73 N 4026.54 W 5982478.76 N 614876.35 E 1.855 4377.16
6205.43 69.61 0 296.430 3322.17 3392.37 1763.36 N 4108.49 W 5982518.08 N 614793.77 E 1.652 4468.61
6301.82 69.990 295.060 3355.45 3425.65 1802.65 N 4189.97 W 5982556.07 N 614711.67 E 1.391 4559.06
6397.24 71.220 297.190 3387.14 3457.34 1842.28 N 4270.77 W 5982594.42 N 614630.25 E 2.469 4649.04
6493.08 73.060 297.610 3416.53 3486.73 1884.26 N 4351.75 W 5982635.11 N 614548.61 E 1.965 4740.18
6589.79 73.150 297.790 3444.64 3514.84 1927.28 N 4433.68 W 5982676.82 N 614466.01 E 0.201 4832.62
6685.69 71.780 296.710 3473.53 3543.73 1969.15 N 4514.97 W 5982717.39 N 614384.07 E 1.787 4924.00 --y
6780.16 73.080 296.180 3502.05 3572.25 2009.25 N 4595.61 W 5982756.21 N 614302.80 E 1.476 5014.03
6876.28 73.570 295.900 3529.63 3599.83 2049.68 N 4678.34 W 5982795.31 N 614219.44 E 0.581 5106.09
6972.08 72.870 296.980 3557.29 3627.49 2090.51 N 4760.46 W 5982834.84 N 614136.68 E 1.303 5197.79
7067.83 71.800 297.740 3586.34 3656.54 2132.44 N 4841.49 W 5982875.48 N 614054.99 E 1.349 5288.95
7163.54 72.080 298.000 3616.02 3686.22 2174.98 N 4921.93 W 5982916.73 N 613973.89 E 0.390 5379.83
7258.65 72.520 295.610 3644.94 3715.14 2215.83 N 5002.80 W 5982956.30 N 613892.38 E 2.438 5470.39
7355.54 73.020 295.090 3673.64 3743.84 2255.45 N 5086.43 W 5982994.59 N 613808.14 E 0.727 5562.93
7450.75 73.790 294.190 3700.83 3771.03 2293.49 N 5169.36 W 5983031.30 N 613724.61 E 1.214 5654.17
7547.02 73.010 295.040 3728.33 3798.53 2331.92 N 5253.24 W 5983068.39 N 613640.13 E 1.171 5746.42
7642.56 72.660 294.720 3756.53 3826.73 2370.32 N 5336.05 W 5983105.48 N 613556.72 E 0.486 5837.71
7722.51 72.390 293.880 3780.54 3850.74 2401.70 N 5405.55 W 5983135.75 N 613486.73 E 1.058 5913.96
7833.78 72.450 291.750 3814.15 3884.35 2442.83 N 5503.32 W 5983175.32 N 613388.32 E 1.826 6019.94
._--~~--- '~'-----_._---_.-
15 October, 2002 - 14:30 Page 3 of7 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PBU_WOA S Pad - S-114
Your Ref: API 500292311600
Job No. AKZZ22152, Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
7929.58 72.240 289.970 3843.20 3913.40 2475.34 N 5588.62 W 5983206.47 N 613302.52 E 1.784 6110.98
8024.72 71.380 291.130 3872.91 3943.11 2507.06 N 5673.25 W 5983236.85 N 613217.39 E 1.469 6201.08
8121.64 70.380 291.020 3904.65 3974.85 2539.99 N 5758.70 W 5983268.41 N 613131.43 E 1.037 6292.43
8218.33 69.790 292.010 3937.59 4007.79 2573.33 N 5843.27 W 5983300.41 N 613046.34 E 1.140 6383.16
8315.18 70.870 293.760 3970.19 4040.39 2608.80 N 5927.28 W 5983334.54 N 612961.78 E 2.034 6474.29
8409.72 69.360 295.160 4002.34 4072.54 2645.60 N 6008.20 W 5983370.05 N 612880.28 E 2.119 6563.18 .~
8504.32 69.080 295.310 4035.91 4106.11 2683.31 N 6088.21 W 5983406.48 N 612799.69 E 0.331 6651.63
8601.06 70.170 295.550 4069.59 4139.79 2722.25 N 6170.11 W 5983444.12 N 612717.18 E 1.150 6742.31
8696.45 72.520 295.540 4100.10 4170.30 2761.22 N 6251.65 W 5983481.79 N 612635.03 E 2.464 6832.68
8794.01 73.610 295.480 4128.52 4198.72 2801.41 N 6335.88 W 5983520.64 N 612550.18 E 1.119 6926.01
8890.10 74.230 295.720 4155.13 4225.33 2841.31 N 6419.14 W 5983559.21 N 612466.29 E 0.688 7018.33
8983.18 72.190 295.470 4182.02 4252.22 2879.80 N 6499.51 W 5983596.42 N 612385.32 E 2.207 7107.44
9078.84 71.820 295.040 4211.57 4281.77 2918.62 N 6581.79 W 5983633.93 N 612302.43 E 0.577 7198.42
9174.24 70.490 293.470 4242.39 4312.59 2955.71 N 6664.10 W 5983669.71 N 612219.55 E 2.090 7288.69
9272.15 70.160 293.630 4275.35 4345.55 2992.55 N 6748.61 W 5983705.20 N 612134.46 E 0.371 7380.85
9367.69 70.170 293.150 4307.77 4377.97 3028.23 N 6831.10 W 5983739.56 N 612051.41 E 0.473 7470.68
9462.17 70.030 290.500 4339.93 4410.13 3061.25 N 6913.56 W 5983771.27 N 611968.44 E 2.641 7559.37
9560.10 69.680 291.770 4373.66 4443.86 3094.40 N 6999.31 W 5983803.06 N 611882.17 E 1.269 7651.09
9655.90 70.670 292.350 4406.15 4476.35 3128.25 N 7082.84 W 5983835.58 N 611798.12 E 1.180 7741.09
9752.21 71.420 293.820 4437.44 4507.64 3163.96 N 7166.63 W 5983869.96 N 611713.78E 1.640 7832.11
9847.84 71.050 296.790 4468.20 4538.40 3202.66 N 7248.47 W 5983907.35 N 611631.32 E 2.966 7922.65
9943.35 70.890 298.090 4499.35 4569.55 3244.27 N 7328.60 W 5983947.68 N 611550.54 E 1.298 8012.86
10037.95 72.890 297.830 4528.75 4598.95 3286.42 N 7408.02 W 5983988.56 N 611470.47 E 2.130 8102.65
10133.94 74.100 298.710 4556.02 4626.22 3330.01 N 7489.07 W 5984030.86 N 611388.73 E 1.537 8194.54 -
10227.96 74.520 298.490 4581.45 4651.65 3373.34 N 7568.54 W 5984072.92 N 611308.58 E 0.500 8284.89
10324.12 74.460 297.460 4607.16 4677.36 3416.80 N 7650.37 W 5984115.08 N 611226.07 E 1.034 8377.42
10420.21 74.930 298.290 4632.53 4702.73 3460.14 N 7732.30 W 5984157.11 N 611143.47 E 0.966 8469.99
10515.10 74.240 297.830 4657.75 4727.95 3503.17 N 7813.02 W 5984198.85 N 611062.07 E 0.864 8561.35
10610.85 73.820 297.520 4684.09 4754.29 3545.92 N 7894.55 W 5984240.31 N 610979.88 E 0.538 8653.30
10706.99 73.530 297.820 4711.12 4781.32 3588.77 N 7976.26 W 5984281.85 N 610897.50 E 0.425 8745.47
10802.74 72.750 297.740 4738.89 4809.09 3631.47 N 8057.33 W 5984323.27 N 610815.76 E 0.819 8837.00
10898.20 72.060 297.390 4767.74 4837.94 3673.58 N 8138.00 W 5984364.09 N 610734.44 E 0.803 8927.91
10980.85 71.980 296.920 4793.26 4863.46 3709.46 N 8207.94 W 5984398.85 N 610663.93 E 0.549 9006.47
11090.28 73.040 296.160 4826.15 4896.35 3756.09 N 8301.32 W 5984444.00 N 610569.83 E 1.173 9110.81
11186.15 72.270 296.040 4854.73 4924.93 3796.35 N 8383.49 W 5984482.95 N 610487.02 E 0.812 9202.30
--~----
15 October, 2002. 14:30 Page 4 of7 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PBU_WOA $ Pád - $-114
Your Ref: API 500292311600
Job No. AKZZ22152, Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (01100ft)
11281.86 71.410 295.080 4884.56 4954.76 3835.59 N 8465.53 W 5984520.88 N 610404.37 E 1.310 9293.24
11378.13 71.400 295.820 4915.26 4985.46 3874.80 N 8547.92 W 5984558.78 N 610321.37 E 0.729 9384.48
11474.71 71.260 296.430 4946.17 5016.37 3915.09 N 8630.07 W 5984597.75 N 610238.59 E 0.616 9475.96
11569.85 69.840 294.690 4977.85 5048.05 3953.80 N 8710.99 W 5984635.17 N 610157.06 E 2.281 9565.66
11664.82 69.820 294.910 5010.60 5080.80 3991.19 N 8791.92 W 5984671.28 N 610075.55 E 0.218 9654.81
11759.96 70.410 294.340 5042.96 5113.16 4028.47 N 8873.25 W 5984707.26 N 609993.64 E 0.838 9744.27 ~
11855.33 70.920 293.340 5074.54 5144.74 4064.84 N 8955.56 W 5984742.32 N 609910.76 E 1.125 9834.24
11951.62 71.190 292.830 5105.80 5176.00 4100.55 N 9039.34 W 5984776.69 N 609826.43 E 0.574 9925.26
12046.45 70.630 293.120 5136.81 5207.01 4135.53 N 9121.85 W 5984810.36 N 609743.37 E 0.657 10014.81
12142.72 71.000 292.760 5168.45 5238.65 4170.97 N 9205.58 W 5984844.46 N 609659.09 E 0.522 10105.67
12271.04 71.170 291.380 5210.05 5280.25 4216.58 N 9318.07 W 5984888.28 N 609545.89 E 1.026 10226.90
12366.69 70.540 290.670 5241.42 5311.62 4249.00 N 9402.42 W 5984919.36 N 609461.04 E 0.962 10317.03
12462.66 70.050 291.820 5273.78 5343.98 4281.73 N 9486.62 W 5984950.75 N 609376.32 E 1.238 10407.18
12559.38 69.810 292.800 5306.97 5377.17 4316.22 N 9570.67 W 5984983.90 N 609291.74 E 0.984 10497.92
12655.77 70.110 294.140 5340.00 5410.20 4352.28 N 9653.73 W 5985018.64 N 609208.12 E 1.343 10588.43
12750.48 69.440 293.080 5372.74 5442.94 4387.88 N 9735.16 W 5985052.94 N 609126.14 E 1 .266 10677.27
12846.19 69.090 292.400 5406.63 5476.83 4422.48 N 9817.71 W 5985086.22 N 609043.05 E 0.758 10766.71
12942.45 69.240 291.650 5440.87 5511.07 4456.22 N 9901.11 W 5985118.63 N 608959.12 E 0.745 10856.54
13037.67 69.740 292.850 5474.23 5544.43 4489.99 N 9983.65 W 5985151.09 N 608876.06 E 1.292 10945.62
13133.48 70.760 294.030 5506.61 5576.81 4525.86 N 10066.38 W 5985185.64 N 608792.77 E 1.574 11035.75
13227.73 71.270 294.910 5537.27 5607.47 4562.77 N 10147.49 W 5985221.27 N 608711.08 E 1.036 11124.87
13323.63 71.990 294.830 5567.49 5637.69 4601.05 N 10230.07 W 5985258.23 N 608627.91 E 0.755 11215.88
13419.39 72.690 295.730 5596.54 5666.74 4640.02 N 10312.57 W 5985295.88 N 608544.79 E 1.156 11307.13 ~/
13514.81 74.160 298.4 70 5623.77 5693.97 4681.68 N 10393.97 W 5985336.24 N 608462.74 E 3.154 11398.51
13611.06 72.770 299.970 5651.16 5721.36 4726.72 N 10474.50 W 5985380.00 N 608381.51 E 2.078 11490.53
13706.92 71.980 299.660 5680.19 5750.39 4772.14 N 10553.76 W 5985424.16 N 608301.53 E 0.880 11581.58
13803.56 71.970 299.740 5710.09 5780.29 4817.67 N 10633.59 W 5985468.42 N 608220.99 E 0.079 11673.18
13898.33 72.110 298.790 5739.31 5809.51 4861.74 N 10712.23 W 5985511.23 N 608141.66 E 0.965 11763.09
13994.46 71 .830 299.190 5769.07 5839.27 4906.04 N 10792.19 W 5985554.26 N 608061.01 E 0.491 11854.28
14090.46 70.700 298.050 5799.90 5870.10 4949.59 N 10871.99 W 5985596.53 N 607980.53 E 1.628 11945.02
14185.76 68.090 295.670 5833.44 5903.64 4989.90 N 10951.55 W 5985635.58 N 607900.34 E 3.600 12034.16
14281.49 65.590 293.350 5871.09 5941.29 5026.43 N 11031.61W 5985670.82 N 607819.71 E 30433 12122.16
14378.43 64.540 293.800 5911.96 5982.16 5061.58 N 11112.18 W 5985704.69 N 607738.59 E 1.162 12210.03
14474.45 63.120 292.660 5954.31 6024.51 5095.57 N 11191.36 W 5985737.43 N 607658.88 E 1.823 12296.16
14570.15 60.980 293.310 5999.16 6069.36 5128.58 N 11269.19 W 5985769.19 N 607580.54 E 2.315 12380.63
15 October, 2002 - 14:30 Page 50f7 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PBU_WOA S Pad - S-114
Your Ref: API 500292311600
Job No. AKZZ22152, Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
14665.84 58.090 295.840 6047.68 6117.88 5162.85 N 11344.19 W 5985802.26 N 607505.00 E 3.783 12463.09
14761.66 53.400 298.040 6101.60 6171.80 5198.68 N 11414.79 W 5985836.97 N 607433.85 E 5.249 12542.22
14856.43 48.500 298.470 6161.29 6231.49 5233.50 N 11479.60W 5985870.76 N 607368.49 E 5.182 12615.68
14952.82 43.540 300.810 6228.21 6298.41 5267.73 N 11539.89 W 5985904.03 N 607307.67 E 5.434 12684.79
15048.35 37.270 304.890 6300.93 6371.13 5301.17 N 11591.93 W 5985936.64 N 607255.10 E 7.120 12746.11
,-,"'
15143.19 31.640 309.290 6379.11 6449.31 5333.38 N 11634.78 W 5985968.16 N 607211.74 E 6.487 12798.57
15239.61 27.490 310.010 6462.96 6533.16 5363.72 N 11671.41 W 5985997.91 N 607174.63 E 4.320 12844.60
15335.31 25.660 312.030 6548.55 6618.75 5391.79 N 11703.73 W 5986025.47 N 607141.88 E 2.132 12885.77
15431.04 25.370 311.940 6634.94 6705.14 5419.38 N 11734.38 W 5986052.57 N 607110.79 E 0.306 12925.22
15526.16 26.060 311.660 6720.64 6790.84 5446.88 N 11765.15 W 5986079.58 N 607079.59 E 0.737 12964.74
15603.00 26.060 311.660 6789.67 6859.87 5469.32 N 11790.37 W 5986101.62 N 607054.02 E 0.000 12997.09 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 295.070° (True).
Magnetic Declination at Surface is 25.961°(07-Sep-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 15603.0Of1.,
The Bottom Hole Displacement is 12997.16f1., in the Direction of 294.886° (True).
----
--
15 October, 2002 - 14:30
Page 60f7
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PBU.;..WOA 8 P,d - 8-114
Your Ref: AP/500292311600
Job No. AKZZ22152, Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
15603.00
6859.87
5469.32 N
11790.37 W
Projected Survey
'-
'--/
Survey tool program for 5-114
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
1364.98
0.00 1364.98
1327.09 15603.00
1327.09 Tolerable Gyro(S-114 Gyro)
6859.87 AK-6 BP _IFR-AK(S-114)
~-
15 October, 2002 - 14:30
Page 70f7
DrillQlIest 3.03.02.002
~~/76
16-0ct-02
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well S-114 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
, M D (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
OCT 1 7 2002
AIa8ka œ &:.;; CoIømieim
Attachment(s)
Sperry-Sun Drilring Services
North S/oPQcAlaska
BPXA
PBU_WOAiS Pad
5-114 AMID
~
Job No. AKMW22152, Surveyed: 16 September, 2002
Surveylleport
15 October, 2002
Your Ref: API 500292311600
Surface Coordinates: 5980820.17 N, 618929.73 E (10021' 22.5075" N, 149002' 02.8406" W)
Grid Coordinate System: HAD21 Alaska State Planes, Zone 4
~/
Surface Coordinates relative to Project H Reference: 980820.11 H, 118929.73 E (Grid)
Surface Coordinates relative to Structure Refèrence: 52.14 S, 1012.31 E(True)
Kelly Bushing: 70.20ft abovè Mean Sea Level
Elevation relative to Project V Reference: 70.20ft
Elevation relative to Structure Reference: 70.20ft
srw-r-'r-aY-IIUI1
CUULLtNG'. ~.AVIc:es
A Halliburton Company
Survey Ref: svy11338
Sperry-Sun Drilling Services
Survey Report for PBU_WO~S Pad - S-114 MWD
Your Ref: API SOÐf92311600
Job No. AKMW22152, Surveyed: 16 SeptemÞe" 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (01100ft)
1364.98 25.000 285.750 1256.89 1327.09 82.35 N 238.39 W 5980898.73 N 618690.06 E 250.83 MWD Magnetic
1488.20 29.100 288.320 1366.61 1436.81 98.85 N 291.92 W 5980914.37 N 618636.28 E 3.459 306.30
1584.00 35.590 286.910 1447.50 1517.70 114.29 N 340.76W 5980929.04 N 618587.20 E 6.820 357.09
1679.15 36.290 284.930 1524.54 1594.74 129.60 N 394.46 W 5980943.49 N 618533.26 E 1 .426 412.22
1775.58 42.100 284.860 1599.24 1669.44 145.26 N 453.33 W 5980958.21 N 618474.15 E 6.025 472.17
1872.94 46.070 283.900 1669.16 1739.36 162.06 N 518.93 W 5980973.97 N 618408.29 E 4.135 538.71 '-'
1967.35 46.250 282.220 1734.56 1804.76 177.44 N 585.26 W 5980988.30 N 618341.72 E 1.298 605.31
2062.69 46.870 283.920 1800.12 1870.32 193.10 N 652.69 W 5981002.88 N 618274.06 E 1.449 673.02
2157.95 46.500 282.740 1865.47 1935.67 209.08 N 720.13 W 5981017.79 N 618206.37 E 0.981 740.88
2254.01 48.070 281 .290 1930.63 2000.83 223.76 N 789.16 W 5981031.38 N 618137.12 E 1.975 809.63
2349.89 48.160 285.180 1994.66 2064.86 240.10 N 858.62 W 5981046.61 N 618067.41 E 3.022 879.47
2444.46 48.370 284.730 2057.61 2127.81 258.31 N 926.80 W 5981063.73 N 617998.95 E 0.419 948.94
2539.77 50.280 287.810 2119.74 2189.94 278.58 N 996.16 W 5981082.90 N 617929.27 E 3.165 1020.36
2636.19 53.730 289.290 2179.08 2249.28 302.77 N 1068.18 W . 5981105.95 N 617856.88 E 3.777 1095.84
2732.01 58.530 291.050 2232.47 2302.67 330.23 N 1142.82 W 5981132.21 N 617781.81 E 5.236 1175.08
2828.46 65.190 294.240 2277.94 2348.14 363.02 N 1221.23 W 5981163.76 N 617702.89 E 7.495 1260.00
2922.52 68.590 293.980 2314.86 2385.06 398.35 N 1300.18W 5981197.83 N 617623.39 E 3.624 1346.48
3019.30 72.940 293.820 2346.73 2416.93 435.36 N 1383.70 W 5981233.51 N 617539.29 E 4.497 1437.82
3114.56 71 .430 295.940 2375.88 2446.08 473.51 N 1465.97 W 5981270.34 N 617456.42 E 2.646 1528.50
3211.07 70.340 298.110 2407.49 2477.69 514.93 N 1547.20 W 5981310.47 N 617374.55 E 2.406 1619.63
3304.92 73.090 297.340 2436.93 2507.13 556.38 N 1626.07 W 5981350.67 N 617295.03 E 3.032 1708.64
3400.88 74.090 301.010 2464.05 2534.25 601.25 N 1706.43 W 5981394.25 N 617213.97 E 3.814 1800.43
3496.99 74.530 301.630 2490.04 2560.24 649.35 N 1785.47 W 5981441.09 N 617134.17 E 0.772 1892.41 ~
3593.05 74.340 301.040 2515.81 2586.01 697.47 N 1864.51 W 5981487.95 N 617054.38 E 0.624 1984.39
3688.82 74.060 301.750 2541.89 2612.09 745.48 N 1943.17 W 5981534.70 N 616974.97 E 0.771 2075.98
3785.52 73.620 304.400 2568.81 2639.01 796.16 N 2020.99 W 5981584.14 N 616896.35 E 2.671 2167.95
3880.80 72.880 302.630 2596.27 2666.47 846.53 N 2097.06 W 5981633.30 N 616819.50 E 1.941 2258.19
3975.75 72.690 298.040 2624.38 2694.58 892.33 N 2175.31 W 5981677.85 N 616740.53 E 4.622 2348.48
4071.96 72.080 296.570 2653.50 2723.70 934.39 N 2256.79 W 5981718.62 N 616658.39 E 1.588 2440.10
4167.10 71 .000 292.810 2683.64 2753.84 972.09 N 2338.76 W 5981755.01 N 616575.83 E 3.917 2530.32
4264.15 71 . 1 50 290.110 2715.12 2785.32 1005.67 N 2424.19 W 5981787.23 N 616489.88 E 2.636 2621.94
4359.46 72.400 291.010 2744.93 2815.13 1037.46 N 2508.95 W 5981817.67 N 616404.63 E 1.589 2712.18
4455.52 73.380 284.920 2773.21 2843.41 1065.75 N 2596.23 W 5981844.57 N 616316.90 E 6.144 2803.23
4551.11 73.540 289.040 2800.43 2870.63 1092.51 N 2683.85 W 5981869.93 N 616228.87 E 4.135 2893.93
4647.09 74.510 281.200 2826.89 2897.09 1116.54 N 2772.85 W 5981892.55 N 616139.50 E 7.917 2984.73
----.--..------
15 October, 2002 - 14:37 Page 20f7 Dri/lQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PBU_WOA8 Pad - 8-114 MWD
Your Ref: API 500292311600
Job No. AKMW22152, Surveyéd: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) .(ft) (o/100ft)
4741.52 73.200 295.460 2853.27 2923.47 1144.95 N 2858.71 W 5981919.59 N 616053.20 E 14.568 3074.54
4837.71 74.210 288.260 2880.29 2950.49 1179.28 N 2944.34 W 5981952.56 N 615967.04 E 7.260 3166.64
4933.87 72.530 298.120 2907.87 2978.07 1215.48 N 3028.92 W 5981987.41 N 615881.90 E 9.978 3258.60
5029.93 71.990 297.270 2937.14 3007.34 1258.00 N 3109.93 W 5982028.64 N 615800.22 E 1.013 3349.99
5125.62 72.250 300.440 2966.53 3036.73 1301.94 N 3189.68 W 5982071.31 N 615719.79 E 3.164 3440.85
~
5221 .46 72.330 301.420 2995.68 3065.88 1348.87 N 3267.99W 5982116.99 N 615640.74 E 0.978 3531.67
5317.27 72.150 299.380 3024.91 3095.11 1395.04 N 3346.68 W 5982161.90 N 615561.32 E 2.036 3622.51
5413.31 71.580 301.240 3054.81 3125.01 1441.10 N 3425.47 W 5982206.70 N 615481.81 E 1.934 3713.39
5509.87 71.940 302.240 3085.03 3155.23 1489.34 N 3503.47 W 5982253.70 N 615403.06 E 1.052 3804.48
5603.69 70.450 300.270 3115.28 3185.48 1535.42 N 3579.38 W 5982298.57 N 615326.43 E 2.544 3892.77
5700.17 69.260 296.440 3148.51 3218.71 1578.44 N 3659.06 W 5982340.32 N 615246.07 E 3.926 3983.17
5796.15 68.650 296.120 3182.98 3253.18 1618.10 N 3739.38 W 5982378.70 N 615165.13 E 0.708 4072.73
5891.62 68.500 300.170 3217.87 3288.07 1660.01 N 3817.73 W 5982419.36 N 615086.13 E 3.952 4161.45
5986.54 70.880 297.630 3250.82 3321.02 1703.01 N 3895.65 W 5982461.12 N 615007.53 E 3.547 4250.26
6082.42 71.500 294.740 3281.74 3351.94 1743.05 N 3977.09 W 5982499.86 N 614925.47 E 2.926 4340.99
6099.70 71.370 296.270 3287.24 3357.44 1750.11 N 3991.87 W 5982506.68 N 614910.58 E 8.427 4357.37
6108.34 71.210 296.310 3290.01 3360.21 1753.73 N 3999.21 W 5982510.19 N 614903.18 E 1.903 4365.55
6205.43 69.610 292.800 3322.57 3392.77 1791.75N 4082.38 W 5982546.88 N 614819.42 E 3.783 4456.99
6301.82 69.990 287.090 3355.88 3426.08 1822.58 N 4167.38 W 5982576.36 N 614733.94 E 5.573 4547.05
6397.24 71.220 296.760 3387.63 3457.83 1856.17 N 4250.74 W 5982608.62 N 614650.06 E 9.644 4636.78
6493.08 73.060 296.520 3417.02 3487.22 1897.07 N 4332.27 W 5982648.22 N 614567.89 E 1.935 4727.97
6589.79 73.150 299.760 3445.14 3515.34 1940.70 N 4413.86 W 5982690.55 N 614485.62 E 3.207 4820.36
6685.69 71.780 297.100 3474.03 3544.23 1984.24 N 4494.26 W 5982732.81 N 614404.54 E 3.006 4911.63
6780.16 73.080 297.330 3502.55 3572.75 2025.43 N 4574.35 W 5982772.72 N 614323.80 E 1.396 5001.63
6876.28 73.570 296.190 3530.13 3600.33 2066.89 N 4656.56 W 5982812.87 N 614240.94 E 1.245 5093.66
6972.08 72.870 298.280 3557.79 3627.99 2108.85 N 4738.11 W 5982853.54 N 614158.73 E 2.213 5185.31
7067.83 71 .800 298.740 3586.85 3657.05 2152.40 N 4818.28 W 5982895.80 N 614077.88 E 1.208 5276.38
7163.54 72.080 298.760 3616.52 3686.72 21Q6.17 N 4898.06 W 5982938.30 N 613997.42 E 0.293 5367.19
7258.65 72.520 295.080 3645.44 3715.64 2237.18 N 4978.83 W 5982978.02 N 613916.01 E 3.715 5457.73
7355.54 73.020 295.760 3674.14 3744.34 2276.90 N 5062.42 W 5983016.41 N 613831.80 E 0.846 5550.27
7450.75 73.790 293.940 3701.34 3771.54 2315.24 N 5145.21 W 5983053.43 N 613748.41 E 2.002 5641.51
7547.02 73.010 295.370 3728.84 3799.04 2353.72 N 5229.05 W 5983090.58 N 613663.97 E 1.638 5733.76
7642.56 72.660 296.210 3757.04 3827.24 233.3.44 N 5311.24 W 5983128.99 N 613581.16 E 0.916 5825.04
7722.51 72.390 296.280 3781.05 3851.25 24 .7.16 N 5379.64 W 5983161.62 N 613512.23 E 0.348 5901.28
7833.78 72.450 293.390 3814.66 3884.86 2471.71 N 5475.90 W 5983204.63 N 613415.28 E 2.477 6007.34
------_._._~_.-._.__.---,.~--_.._+------._--~- -..-------"-.--"..,-- .."._.._~----~~-_.~---_._--
15 October, 2002.14:37 Page 3 of7 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PSU_WOA S Pad - $-114 MWD
Your Ref: AP5Ot1292311600
Job No. AKMW22152, Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
7929.58 72.240 288.100 3843.74 3913.94 2504.03 N 5561.23 W 5983235.59 N 613329.45 E 5.266 6098.33
8024.72 71.380 292.020 3873.45 3943.65 2535.02 N 5646.11 W 5983265.23 N 613244.08 E 4.017 6188.35
8121.64 70.380 284.490 3905.23 3975.43 2563.70 N 5732.99 W 5983292.53 N 613156.76 E 7.412 6279.20
8218.33 69.790 288.290 3938.18 4008.38 2589.34 N 5820.19 W 5983316.78 N 613069.17 E 3.745 6369.04
8315.18 70.870 285.220 3970.78 4040.98 2615.62 N 5907.50 W 5983341.67 N 612981.44 E 3.186 6459.26
.~
8409.72 69.360 289.870 4002.95 4073.15 2642.39 N 5992.25 W 5983367.09 N 612896.29 E 4.893 6547.37
8504.32 69.080 293.200 4036.53 4106.73 2674.85 N 6074.50 W 5983398.24 N 612813.53 E 3.304 6635.63
8601.06 70.170 290.090 4070.21 4140.41 2708.28 N 6158.79 W 5983430.33 N 612728.72 E 3.217 6726.14
8696.45 72.520 293.090 4100.73 4170.93 2741.55N 6242.80 W 5983462.26 N 612644.19 E 3.866 6816.33
8794.01 73.610 292.150 4129.15 4199.35 2777.44 N 6328.95 W 5983496.78 N 612557.48 E 1.448 6909.57
8890.10 74.230 295.160 4155.77 4225.97 2814.49 N 6413.51 W 5983532.48 N 612472.35 E 3.078 7001.86
8983.18 72.190 296.170 4182.65 4252.85 2853.07 N 6493.82 W 5983569.79 N 612391.43 E 2.425 7090.97
9078.84 71.820 292.720 4212.22 4282.42 2890.72 N 6576.63 W 5983606.11 N 612308.03 E 3.452 7181.92
9174.24 70.490 293.830 4243.03 4313.23 2926.39 N 6659.57 W 5983640.46 N 612224.54 E 1.777 7272.16
9272.15 70.160 296.700 4276.00 4346.20 2965.73 N 6742.94 W 5983678.48 N 612140.56 E 2.781 7364.34
9367.69 70.170 295.440 4308.42 4378.62 3005.23 N 6823.66 W 5983716.69 N 612059.22 E 1.241 7454.20
9462.17 70.030 296.670 4340.58 4410.78 3044.25 N 6903.47 W 5983754.43 N 611978.80 E 1.233 7543.02
9560.10 69.680 293.210 4374.32 4444.52 3083.01 N 6986.82 W 5983791.87 N 611894.85 E 3.336 7634.94
9655.90 70.670 285.880 4406.85 4477.05 3113.12N 7071.68 W 5983820.62 N 611809.52 E 7.271 7724.57
9752.21 71.420 293.780 4438.17 4508.37 3144.00 N 7157.28 W 5983850.14 N 611723.44 E 7.796 7815.19
9847.84 71.050 298.980 4468. 96 4539.16 3184.21 N 7238.37 W 5983889.06 N 611641.72 E 5.163 7905.68
9943.35 70.890 296.430 4500.10 4570.30 3226.19 N 7318.30 W 5983929.76 N 611561.14 E 2.529 7995.86
10037.95 72.890 297.290 4529.51 4599.71 3266.81 N 7398.50 W 5983969.11 N 611480.30 E 2.284 8085.73 ~
10133.94 74.100 299.500 4556.78 4626.98 3310.58 N 7479.45 W 5984011.59 N 611398.66 E 2.542 8177.60
10227.96 74.520 298.200 4582.21 4652.41 3354.25 N 7558.74 W 5984054.00 N 611318.69 E 1.404 8267.91
10324.12 74.460 296.600 4607.92 4678.12 3396.89 N 7641.00 W 5984095.33 N 611235.77 E 1.605 8360.49
10420.21 74.930 290.690 4633.31 4703.51 3434.04 N 7725.86 W 5984131.12 N 611150.33 E 5.952 8453.10
10515.10 74.240 295.500 4658.54 4728.74 3469.90 N 7809.97 W 5984165.65 N 611065.65 E 4.940 8544.49
10610.85 73.820 294.780 4684.89 4755.09 3509.01 N 7893.31 W 5984203.43 N 610981.71 E 0.846 8636.54
10706.99 73.530 296.820 4711.91 4782.11 3549.17 N 7976.37 W 5984242.25 N 610898.02 E 2.059 8728. 79
10802.74 72.750 297.610 4739.69 4809.89 3591.07 N 8057.86 W 5984282.86 N 610815.87 E 1.134 8820.36
10898.20 72.060 298.190 4768.54 4838.74 3633.65 N 8138.28 W 5984324.16 N 610734.79 E 0.926 8911.24
10980.85 71.980 297.790 4794.05 4864.25 3670.54 N 8207.69 W 5984359.94 N 610664.80 E 0.470 8989.76
11090.28 73.040 297.150 4826.94 4897.14 3718.69 N 8300.30 W 5984406.61 N 610571.44 E 1.118 9094.03
11186.15 72.270 298.110 4855.52 4925.72 3761.12 N 8381.37 W 5984447.75 N 610489.70 E 1.248 9185.45
--_._--...-._-----------_._-_.__.._.__..--+~--_._. -.-.------------ --------------."'--.----.-.----.-..---
15 October, 2002 - 14:37 Page 4 of7 Dril/Quest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PBU_WOA $ Pad - $-114 MWD
Your Ref: API 500292311600
Job No. AKMW22152. Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (01100ft)
11281.86 71.410 295.400 4885.36 4955.56 3802.06 N 8462.57 W 5984487.40 N 610407.87 E 2.836 9276.34
11378.13 71.400 299.350 4916.07 4986.27 3844.01 N 8543.57 W 5984528.05 N 610326.21 E 3.889 9367.49
11474.71 71 .260 299.570 4946.98 5017.18 3889.01 N 8623.24 W 5984571.78 N 610245.84 E 0.260 9458.72
11569.85 69.840 297.470 4978.67 5048.87 3931.84 N 8702.05 W 5984613.36 N 610166.35 E 2.561 9548.26
11664.82 69.820 297.580 5011.41 5081.61 3973.04 N 8781.11 W 5984653.30 N 610086.65 E 0.111 9637.32
.~
11759.96 70.410 295.940 5043.78 5113.98 4013.32 N .8860.99 W 5984692.31 N 610006.14 E 1.736 9726.75
11855.33 70.920 294.670 5075.35 5145.55 4051.78 N 8942.35 W 5984729.47 N 609924.19 E 1.366 9816.74
11951.62 71.190 292.400 5106.62 5176.82 4088.14 N 9025.84 W 5984764.50 N 609840.13 E 2.247 9907.77
12046.45 70.630 291.890 5137.63 5207.83 4121.93 N 9108.84 W 5984796.96 N 609756.60 E 0.779 9997.27
12142.72 71.000 286.190 5169.29 5239.49 4151.57 N 9194.75 W 5984825.24 N 609670.23 E 5.605 10087.64
12271.04 71.170 289.420 5210.90 5281.10 4188.68 N 9310.31 W 5984860.51 N 609554.10 E 2.385 10208.04
12366.69 70.540 286.960 5242.27 5312.47 4216.89 N 9396.14 W 5984887.35 N 609467.83 E 2.517 10297.74
12462.66 70.050 290.000 5274.64 5344.84 4245.52 N 9481.82 W 5984914.62 N 609381.70 E 3.026 10387.48
12559.38 69.810 290.240 5307.83 5378.03 4276.77 N 9567.12 W 5984944.51 N 609295.91 E 0.340 10477.99
12655.77 70.110 293.110 5340.87 5411.07 4310.21 N 9651.26 W 5984976.62 N 609211.25 E 2.814 10568.37
12750.48 69.440 292.220 5373.61 5443.81 4344.46 N 9733.27 W 5985009.56 N 609128.72 E 1.130 10657.16
12846.19 69.090 293.760 5407.50 5477.70 4379.42 N 9815.67 W 5985043.20 N 609045.77 E 1.549 10746.61
12942.45 69.240 291.280 5441.74 5511.94 4413.87 N 9898.76 W 5985076.33 N 608962.14 E 2.413 10836.48
13037.67 69.740 293.520 5475.10 5545.30 4447.86 N 9981.21 W 5985109.00 N 608879.16 E 2.265 10925.56
13133.48 70.760 295.990 5507.48 5577.68 4485.62 N 10063.09 W 5985145.46 N 608796.70 E 2.650 11015.72
13227.73 71.270 295.770 5538.14 5608.34 4524.52 N 10143.27 W 5985183.08 N 608715.91 E 0.584 11104.83
13323.63 71.990 294.490 5568.37 5638.57 4563.17 N 10225.67 W 5985220.42 N 608632.91 E 1.472 11195.84
13419.39 72.690 296.870 5597.42 5667.62 4602.71 N 10307.89 W 5985258.65 N 608550.06 E 2.4 78 11287.08 ~
13514.81 74.160 304.520 5624.68 5694.88 4649.37 N 10386.45 W 5985304.06 N 608470.77 E 7.836 11378.01
1 3611 .06 72.770 300.250 5652.08 5722.28 4698.79 N 10464.34 W 5985352.23 N 608392.11 E 4.491 11469.50
13706.92 71 .980 300.140 5681 . 11 5751.31 4744.74 N 10543.31 W 5985396.92 N 608312.43 E 0.831 11560.49
13803.56 71.970 302.590 5711.02 5781.22 4792.56 N 10621.77 W 5985443.50 N 608233.21 E 2.411 11651.83
13898.33 72.110 300.550 5740.24 5810.44 4839.76 N 10698.57 W 5985489.46 N 608155.67 E 2.053 11741.39
13994.46 71.830 300.810 5770.00 5840.20 4886.40 N 10777.19 W 5985534.85 N 608076.32 E 0.389 11832.37
14090.46 70.700 298.280 5800.83 5871.03 4931.23 N 10856.27 W 5985578.42 N 607996.54 E 2.759 11922.99
14185.76 68.090 295.650 5834.37 5904.57 4971.69 N 10935.75 W 5985617.61 N 607916.43 E 3.765 12012.13
14281.49 65.590 293.780 5872.02 5942.22 5008.49 N 11015.68 W 5985653.14 N 607835.92 E 3.169 12100.13
14378.43 64.540 294.870 5912.89 5983.09 5044.70 N 11095.78 W 5985688.07 N 607755.25 E 1.488 12188.02
14474.45 63.120 292.690 5955.25 6025.45 5079.45 N 11174.63 W 5985721.57 N 607675.87 E 2.518 12274.17
14570.15 60.980 292.990 6000.10 6070.30 5112.26 N 11252.54 W 5985753.14 N 607597.45 E 2.253 12358.64
-.--------.
15 October, 2002 - 14:37 Page 50f7 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for PBU_WOA S Pad - S-114 MWD
Your Ref: API 500292311600
Job No. AKMW22152, Surveyed: 16 September, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (01100ft)
14665.84 58.090 296.100 6048.62 6118.82 5146.48 N 11327.55 W 5985786.17 N 607521.90 E 4.119 12441.09
14761.66 53.400 298.410 6102.54 6172.74 5182.70 N 11397.95 W 5985821.26 N 607450.93 E 5.284 12520.20
14856.43 48.500 299.730 6162.23 6232.43 5218.42 N 11462.27 W 5985855.96 N 607386.05 E 5.282 12593.60
14952.82 43.540 300.830 6229.14 6299.34 5253.36 N 11522.16 W 5985889.94 N 607325.62 E 5.211 12662.65
15048.35 37.270 304.890 6301.87 6372.07 5286.80 N 11574.20 W 5985922.55 N 607273.05 E 7.115 12723.96
',,-,
15143.19 31.640 309.370 6380.05 6450.25 5319.04 N 11617.03 W 5985954.11 N 607229.72 E 6.507 12776.41
15239.61 27.490 310.310 6463.90 6534.10 5349.49 N 11653.57 W 5985983.97 N 607192.70 E 4.331 12822.41
15335.31 25.660 312.460 6549.48 6619.68 5377.77 N 11685.70 W 5986011.74 N 607160.12 E 2.160 12863.50
15431.04 25.370 312.270 6635.88 6706.08 5405.56 N 11716.17W 5986039.04 N 607129.22 E 0.315 12902.87
15526.16 26.060 312.290 6721.58 6791.78 5433.32 N 11746.70 W 5986066.32 N 607098.25 E 0.725 12942.29
15603.00 26.060 312.290 6790.60 6860.80 5456.04 N 11771.67 W 5986088.63 N 607072.92 E 0.000 12974.53 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 295.070° (True).
Magnetic Declination at Surface is 25.961 °(07 -Sep-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 15603.00ft.,
The Bottom Hole Displacement is 12974.62ft., in the Direction of 294.867° (True).
--.---.----------.
15 October, 2002 - 14:37
Page 6 of7
DrillQlIest .1.03.02.002
North Slope Alaska
Comments
Measured
Depth
(ft)
15603.00
Sperry-Sun Drilling Services
Survey Report for PBU_WOASPad - $-114 MWD
Your Ref: API 500292311600
Job No. AKMW22152, Surveyed: 16 September, 2002
BPXA
Station Coordinates
TVD Northings Eastlngs
(ft) (ft) (ft)
6860.80
Comment
5456.04 N
Projected Survey
~/
11771.67 W
Survey tool proøram for 5-114 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
1364.98
15 October, 2002 - 14:37
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00 1364.98
1327.09 15603.00
1327.09 Tolerable Gyro(S-114 Gyro)
6860.80 MWD Magnetic(S-114 MWD)
~/
---
Page 70f7
DrillQuest 3.03.02.002
.IO~
'\ 0 r'{
~ 0 ~~t. 2.
~~yV
f.
bp
')
)
To:
Winton Aubert - AOGCC
Date: September 17, 2002
From:
Walter Quay - BPXA GPB Drilling & Wells
Subject:
Reference:
S-114 Application for Sundry Approval -
Plug Back well for Sidetrack Operations
API # 50-029-23116
Dear Mr. Aubert,
As you are aware, Aurora Well S-114 (Permit #202-175) was drilled as planned to the proposed target,
however will not be completed due to encountering gas in the reservoir at that location. The well
penetrated the Kuparuk reservoir approximately -90' high and LWD logs showed signs of gas in the
reservoir. Plans are to plug back and sidetrack to a Kuparuk target approximately 1200' to the south west
of the current penetration. Below is an outline of the proposed plug back and sidetrack operations. Also
enclosed is a schematic of the existing wellbore and proposed plug-back.
If you have any questions or require any additional information, please contact me at 564-4178.
Scope'
RiQ Operations:
1. RIH to TD at 15,603' MD with 5" DP cement stinger. Circulate and condition well for cementing
operations. Spot a balanced 15.8 ppg cement P&A plug from TD to +/-14,950' MDl-450' above the
Top Kuparuk Reservoir). Plug volume should be based upon an equivalent hole diameter of
10.4" throughout this section (70 bbls total). Pull above cement plug and circulate DP clean.
Spot a 11.0' ppg heavy mud spacer from top of cement P&A plug at -14,950' MD to -12,050' MD.
Pull DP up to 12,800' MD and circulate out any excess heavy mud spacer above this point.
3. Spot a 10.7 ppg Form-A-Plug pill (cross-linked polymer pill) from 12,800' to -12,600' MD to act as a
base for the upcoming cement kick-off plug. Pull DP above top of plug and circulate any excess pill
out of DP. Pull to shoe and wait on Form-A-Plug to set (-6 hrs).
4. RIH to -12,300' and wash down looking for top of plug. Once top of plug is verified, condition mud as
required for spotting the cement kick-off plug.
5. Spot a 15.8 ppg cement kick-off plug from 12,600' to 12,200' MD (estimated depths). Plug volume
should be based upon an equivalent hole diameter of 11.5" throughout this section (51 bbls
total). Pull DP above plug and circulate DP clean. POOH. /
6. PU 9-7/8" drilling assembly and RIH. Dress top of cement as required. Planned kick-off point is at
-12,300' MD, however will kick-off soon if plug allows. Kick-off and drill the 9-7/8" hole section as per
directional plan to TD @ :f:14,940' MD (7205' TVD). POOH.
7. Run and cement the 7", 26# production casing as required to cover all significant hydrocarbon
intervals (no significant hydrocarbons were seen in the Ugnu or West Sak intervals and therefore,
plans are to bring cement -1200' above top Kuparuk formation only). Displace the 7" casing with
seawater during cementing operations. Once cement has had adequate time to set, freeze protect
the 7" x 10-3/4" annulus as required.
8. RU slick-line and run gauge ring / junk basket to PBTD.
9. Run a 4-1/2",12.6#, L-80 TC-II completion and space-out tubing tail -50' MD above top Kuparuk.
S-114 Application for Sundry
')
)
10. RU slick-line. RIH with standing valve and set in 'XN' nipple below packer. Set packer and test the
tubing to 4000 psi and annulus to 4000 psi for 30 minutes. Shear open RP valve in bottom GLM.
11. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
12. Freeze protect the well to -2400'. Secure the well. Rig down and move off.
Post-Riq Work:
1. RU e-line - Run Cement Evaluation log.
2. Perforate the Kuparuk interval, using bottom most GLM to circulate guns down as required.
3. Pull RP shear valve from bottom GLM and install dummy valve.
S-114 Application for Sundry
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: III Abandon 0 Suspend III Plugging 0 Time Extension 0 Perforate
0 Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance III Other
0 Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate Plug Back for Sidetrack
;JGIt- c¡ /11 /0 'L
JA- 9/ /9/1!íJ fw""l -
Ðv:J //17/0 Z-
2. Name of Operator
BP Exploration (Alaska) Inc.
5. Type of well:
iii Development
0 Exploratory
0 Stratigraphic
0 Service
6. Datum Elevation (OF or KB)
RKB = 70.2'
7. Unit or Property Name
Prudhoe Bay Unit
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
8. Well Number
8-114
9. Permit Number
202-175
10. API Number
50- 029-23116-00
11. Field and Pool
Prudhoe Bay Field 1 Aurora Pool
(Undefined)
4. Location of well at surface
4617' NSL, 4496' WEL, SEC. 35, T12N, R12E, UM
At top of productive interval
4770' NSL, 395' WEL, SEC. 29, T12N, R12E, UM
At effective depth
NIA
At total depth
4806' NSL, 431' WEL, SEC. 29, T12N, R12E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
15603 feet
6860 feet
NI A feet
NI A feet
Plugs (measured)
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
115'
6105'
20"
10-3/4"
260 sx Arctic Set (Approx.)
951 sx Arcticset Lite III, 720 sx 'G'
115'
6139'
115'
3370'
Perforation depth: measured
None
true vertical
None
Tubing (size, grade, and measured depth)
None
Packers and SSSV (type and measured depth) None
13. Attachments
iii Description Summary of Proposal
0 Detailed Operations Program
15. Status of well classifications as:
iii Oil 0 Gas 0 Suspended
0 BOP Sketch
14. Estimated date for commencing operation
Septermber 18, 2002
16. If proposal was verbally approved /
Winton Aubert 9/17/2002
Name of approver Date Approved
Contact Engineer Name/Number. Waite Quay, 564-4178
17. I hereby certify that the fore ing is tru~9 rrect to the best of my knowledge
Signed L II C Title Senior Drilling Engineer
owe rane " ,
, . ~'.' " '. .,",' .,.' .i<""';>':.;-:.;.~..'.;~~¡,":~¡~~Tj.r~:;:~.~:..¡;:)(~;,~'~.~::g,::(('~:(~ . -' .
Conditions of Approval: Notify Commission so representative may witness
Plug integrity - BOP Test - Location clearance -
407
Service
Prepared By Name/Number: Sandra Stewman, 564-4750
Date
9 -/~-ðJ.-
, -
Approval No. 302. - 30 I
Approved by order of the Commission
Form 1 0-403 Rev. 06/15/88
Mechanical Integrity Test - Subsequent form required 10-
Onglnal SIgned By
Cammy 0ech~1i T ~,Iof !
. ~ ) ( ),
~ 1 ¡,- :!
l_i~\4
1
4
Ib..~
Commissioner
Date \-~ \ \~ 0 l'
Submit In 1ripicate
"} - )
8-114 Proposed Plug-Back
TREE: 4-1/16" - 5M Carbon
WELLHEAD: 13 5/8" - 5M FMC SH
Cellar Elevation = 36.20'
Doyon 14 RKB = 70.5'
10-3/4",45.5 #Ift, L-80, BTC j
16140' I
~
I
Base West Sac/Fault/-Top Colville Shale
at -12,017' MD
/
Top of 15.8 ppg Kick-off Plug at I 12,200' I
Planned KOP from 12,200' to 12,350' MD
15.8 ppg Cement
Kick-off Plug
10.7 ppg Form-A-Plug
Cement Base
Top of Form-A-Plug pill at I 12,600' I
Top of 11.0 ppg Mud Spacer at I 12,800' I
15.8 ppg Cement
P&A Plug
Top of 15.8 ppg P&A Plug at I 14,950' I /
Top Kuparuk Reservoir at I 15,400' I
TDof9-7/8" hole 115,603'1 )......
Date
9/17/02
Rev By
woa
Comments
Aurora
WELL: 5-114
API NO: 50-029-23116-01
Proposed Plug Back for Sidetrack Operations
BP Alaska Drilling & Wells
TREE: 4-1/16" - 5M Carbon
WELLHEAD: 13 5/8" - 5M FMC SH
~ '} ~ )
5-114 Proposed Completion
10-3/4",45.5 #/ft, L-BO, BTC ~
I 6152' I
7",26 #/ft, LBO, BTC-Mod
116,036' 1 ~
Date
8/27/02
9/17/02
Rev By
WSI
WDO
.
I
L
4-1/2" tubing hanger
Cellar Elevation = 36.2'
Doyon 14 RKB = 70.5'
1 2350' 1 4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 12.6# L-80 TC-II Tubing
~
4-1/2" Gas Lift Mandrels with handling pups installed.
GAS LIFT MANDRELS
# TVD Size Valve Type
L
2 3800' 1" DV
1 6500' 1" RP Shear
L
4-1/2" X Landing Nipple with 3.813" seal bore.
7" x 4-1/2" Baker 18-3' Production Packer
4-1/2" IX' Landing Nipple with 3.813" seal bore.
4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID.
4-112" WireLine Entry Guide spaced-out -50' MD above the top Kuparuk.
Plug Back Depth I 15,950' I
~
Comments
Proposed Completion
Proposed Completion
Aurora
WELL: 8-114
API NO: 50-029-?????
BP Alaska Drilling & Wells
)
~u~uŒ (Q~ ~~~~æ~
)
A.I/A.~&A OIL AltO GAS
CONSERVATION COMMISSION /
I
TONY KNOWLES, GOVERNOR
333 W. TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
B ill Isaacson
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit S-114
BP Exploration (Alaska), Inc.
Permit No: 202-175
Surface Location: 4617' NSL, 4496' WEL, Sec. 35, TI2N, RI2E, UM
Bottomhole Location: 4927' NSL, 619'WEL, Sec. 29, TI2N, RI2E, UM
Dear Mr. Isaacason:
Enclosed is the approved application for permit to redrill the above development well.
The permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
1:... .{LLÁ.~
C~echsli Ta~loÇi-
Chair
BfY ORDER OF THE COMMISSION
DATED this~day of August, 2002
cc:
Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
Hole
30"
13-1/2"
9-7/8"
IJ GA. JJ [llÞ 10 ¿.
ALASL¿IL AND ~:~~g~S~~;~ON COMMls,oN JiF ~2b('1-=1--
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test ail Development Oil
0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Plan RKB = 70.5' Prudhoe Bay Field / Aurora
6. Property Designation Pool (Undefined) ./
ADL 028259
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number ./
8-114
9. Approximate spud date
09/03/02/" Amount $200,000.00
14. Number of acres in property .15. Proposed depth (MD and TVD)
2560 16036' MD / 7268' TVD
17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
72 0 Maximum surface 292515sig, At total depth (TVD) 7000' / 3625 psig
Setting Depth
Top Bottom
MD TVD MD TVD
Surface Surface 115' 115'
Surface Surface 6152' 3381'
Surface Surface 16036' 7268'
11. Type Bond (See 20 AAC 25.025)
1 a. Type of work ail Drill 0 Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
4617' NSL, 4496' WEL, SEC. 35, T12N, R12E, UM
At top of productive interval
4770' NSL, 395' WEL, SEC. 29, T12N, R12E, UM
At total depth
4927' NSL, 619' WEL, SEC. 29, T12N, R12E, UM
12. Distance to nearest property line 13. Distance to nearest well /'
ADL 028255, 353' MD S-106 is 14' away at 425' MD
16. To be completed for deviated wells
Kick Off Depth 250' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casina Weiaht Grade Couplina
20" 91.51# H-40 Welded
10-3/4" 45.5# L-80 BTC
7" 26# L-80 BTC-M
Number 2S100302630-277
Lenath
80'
6122'
16006'
Quantitv of Cement
(include staae data)
260 sx Arctic Set (Approx.)
856 sx Articset Lite III, 740 sx 'G'
566 sx Class 'G'
/'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
. Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Junk (measured)
Plugs (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
Perforation depth: measured
true vertical
20. Attachments
ail Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch ail Drilling Program
ail Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: BíIIlsaacson, 564-5521 Prepared By NameINumber: Terrie Hubble, 564-4628
21. IS~;~: :I~:=: J::l~:~in~.iÐ:ueand~or~= to>th~,~~;;~~{~;~?;~; ~~~~n~'c.. ..........Dat: . ~1~c.I~~ .
~~.-i.,~Ä~~i~;::-:.~J'(;~~;t~~~)\~j~~.~.Sj;2~¿f~j;~~~:~~~~~S~~~~.~~~0i¿~~~~i~~~i~~<4~~'~~:p~~ .
Permit Number API Number ,Approva) Date See cover letter
202--/75" 50- o.z9- 2--3//.6 0 ~/.nd.... forotherreauirements
Conditions of Approval: Samples Required 0 Yes S No Mud Lo~ Required 0 Yes œJ No
Hydrogen Sulfide Measures 0 Yes f8I No Directional Survey Required 'æJ Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other:T.est- ~fE ic 3SðO f>~[ .
~ SIgned By by order of
('''''OP8IiJ~'"4.~..,.m;s~neri\J ¡~ \ìe commission
J ¡ \ ¡ \.z) ¡ I ~ r, --
Approved By
Form 10-401 Rev. 12-01-85
Date 7J!;Jq¡n d
g~bmi In Triplicate
)
)
IWell Name: 18-114
Drill and Complete Summary
I Type of Redrill (producer or injector): I Development Producer
x = 618,929.73 1 Y = 5,980,820.17
6631 FNL 7841 FWL 835 T12N R12E
X = 607,100 1 Y = 5,986,075
510' FNL 395' FEL 829 T12N R12E
X = 606,873 1 Y = 5,986,229
353' FNL 619' FEL 829 T12N R12E
Surface Location:
Target Location:
Bottom Hole Location:
I AFE Number: I AUD5M0045 I
I Estimated Start Date: I 09/03/02 I
I MD: 116,036' I I TVD: 17268' I
Umiat
Umiat
Umiat
I Rig: 1 Doyon 14
I Operating days to complete: 125.0 /'
I Cellar Elevation: 136.2' I
I RKB: 170.5'
I Well Design (conventional, slimhole, etc.): I 81imhole
I Objective: I Kuparuk production well in the Aurora Development (Beechey Block)
Formation Markers
Formation Tops MD TVD (not ss)
Base Gubik 400' 400'
SV6 1753' 1646'
Base Permafrost 2116' 1926'
SV5 2645' 2261 '
SV4 3190' 2451'
SV3 4305' 2801 '
SV2 4751' 2941'
SV1 5834' 3281'
10-3/4" Csg Point 6152' 3381 '
Ugnu - UG4 6694' 3551'
Ugnu - UG4A 6790' 3581'
Ugnu - UG3 7873' 3921 '
Schrader Ma 10,230' 4661 '
Schrader N Sands 10,963' 4891 '
Schrader 0 Sands 11 ,345' 5011 '
Colville - CM3 12,205' 5281'
Colville - CM 1 14,837' 6256'
Top HRZ 15,219' 6556'
Base HRZ 15,434' 6741'
Top Kuparuk C 15,468' 6771'
Top Kuparuk A5 15,812' 7071 '
Top Miluveach 15,886' 7136'
TO - 7" Csg Point 16,036' 7268'
TD Criteria: Based upon 150' MD of rat-hole beyond Top Miluveach.
S-114 Permit to Drill 8/26/02
Comments
-8.6 ppg EMW
-8.6 ppg EMW
-8.6 ppg EMW
-8.6 ppg EMW
-8.6 ppg EMW
-8.6 ppg EMW (possible hydrates)
-8.6 ppg EMW (possible hydrates)
-8.6 ppg EMW (possible hydrates)
q.~
-8.7 ppg EMW
-8.7 ppg EMW
-8.7 ppg EMW
-9.0 ppg EMW (possible hydrocarbon bearing)
-9.0 ppg EMW (possible hydrocarbon bearing)
-9.0 ppg EMW (possible hydrocarbon bearing)
q.Lo
-9.9 ppg required for good hole stability
10.\
-8.6 ppg EMW (hydrocarbon bearing)
-9.8 ppg EMW (hydrocarbon bearing)
Page 1
)
)
CasingfTubing Program
Hole Size Csg/ WtlFt Gra, Conn Length Top Btm
Tbg O.D. MDrrVD MDrrVD
30" 20" 91.51# H-40 Welded -80' GL -115' / 115'
13-1/2" 1 0-3/4" 45.5# L-80 BTC -6122' GL 6152' / 3381'
9-7/8" 7" 26# L-80 BTC-M -16,006' GL 16,036' /7268'
Tubing 411211 12.6# L-80 TC-II -15,390' GL 15,418' / 6727'
Directional
KOP: I 250' MD
Maximum Hole Angle:
Close Approach Well:
I
Survey Program:
-71.7° over interval from 2876' to 14,116' MD
All wells pass BP Close Approach guidelines. With respect to allowable
deviation, the nearest close approach well is S-1 06. The well is -14' well-to-
well at -425', which allows for only 4.4' of devi9-tion from the proposed
directional plan (toward the subject well). /
Photo Gyro from surface to -1100'.
IFR & Multi-Shot corrected MWD Surveys from -1100' to TD.
Mud Program
13-1/2" Surface Hole I Extended Bentonite Spud Mud
From Surface to -100' TVD below top SV1
Interval Density Viscosity YP Tauo pH API
(ppg) (seconds) (lb/100fe) Fluid Loss
Initial 8.5-8.6 >300 50-70 >15 8.5 - 9.5 15-20
Base Perm 9.6 / 200-250 30-50 >10 8.5 - 9.5 <10
Interval TD 9.6 150 25-40 >10 8.5 - 9.5 <8
9-7/8" Intermediate / Production Hole I LSND
From Surface Casing Shoe to TD -150' MD into Miluveach
Interval Density PV YP MBT pH API
(ppg) Fluid Loss
Initial 9.3 - 9.4 6-8 22-28 <15 8.5 - 9.5 6-8
Ugnu & Schrader 9.5 8-12 22-28 <15 8.5 - 9.5 6-8
Colville 9.6 / 8-12 22-28 <15 8.5 - 9.5 6-8
HRZ 10.1 8-14 20-24 <15 8.5 - 9.5 4-6
Kuparuk 10.1 8-14 20-24 <15 8.5 - 9.5 4-6
Integrity Testing:
Test Point
Surface Casing Shoe
Depth T est Type
20' of new hole below shoe LOT
EMW
LOT - Require minimum of 12.1 ppg
to achieve -51 bbl kick tolerance
S-114 Permit to Drill 8/26/02
Page 2
)
LOÇlging Program
13-1/2" Surface:
Drilling:
Open Hole:
Cased Hole:
MWD / GR - Real-time over entire interval.
None
None
9-7/8" Inter / Prod:
Drilling: 1st BHA run - MWD / GR / Res / PWD - All Real-time
2nd BHA run - MWD / GR / Res / Den / Neu / PWD - All Real-time
Open Hole: None
Cased Hole: No cased hole logs are planned with the rig on location.
Cement Program
The following surface casing cement calculations are based upon a single stage job. As contingency, a port collar
will be run in the casing at -1000' MD to allow circulating cement to surface if the single stage is unsuccessful.
Casing Size 110-3/4" Surface 1
Basis: Lead: Based on 2444' of open hole below the permafrost +40% excess + 2036' of open hole within
the permafrost + 2300/0 excess + 80' of 20" conductor.
Lead TOC: To Surface.
Tail: Based on 1592' MD I 500' TVD open hole volume + 40% excess + 82' shoe track volume.
Tail TOC: -4560' MD (2880' TVD).
Fluid Sequence & Volumes: Pre None
Flush
Spacer
Lead
75 bbls MudPUSH Viscosified Spacer weighted to 10.2 ppg
677 bbl 13801 fe I 856 sks of Dowell ARTICSET Lite 3 at 10.7
ppg and 4.44 dIsk, BHST 68° I BHCT 63°, TT = 6.0 hrs
153 bbl I 859 fe I 740 sks of Dowell Premium 'G' at 15.8 ppg and
1.16 dIsk, BHST 68° I BHCT 63°, TT = 3.5 to 4.0 hrs
*See Attached Dowell Cement Program for Details on Cement Formulation*
Tail
Casing Size 19-7/8" Intermediate / Production I
Basis: Lead: None
Tail: Based on 1868' of open hole (-1300' MD above top Kuparuk formation) with 30% excess + 82'
shoe track volume.
Tail TOC: -1300' MD above top Kuparuk at 14,168' MD (5898' TVD).
Fluid Sequence & Volumes: Pre None
Flush
Spacer
Lead
Tail
25 bbls MudPUSH Viscosified Spacer weighted to 11.0 ppg
None
118 bbls I 663 fe I 566 sks of Dowell Premium Latex 'G' at 15.8
ppg and 1.17 dIsk, BHST 165° I BHCT 125°, TT = 1.5 hrs to
Batch Mix + 3.5 hrs
*See Attached Dowell Cement Program for Details on Cement Formulation*
S-114 Permit to Drill 8/26/02
Page 3
)
)
Well Control
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular
preventer will be installed and is capable of handling maximum pote~1 surface pressures. Based upon
calculations below, BOP equipment will be tested to 3500 psi.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Production Section-
. Maximum anticipated BHP: 2200 psi @ 4600' TVDss - Schrader Bluff
. Maximum surface pressure: 1740 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
.
Maximum anticipated BHP: 3625 psi @ 7000' TVDss - Kuparuk
Maximum surface pressure: 2925 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
.
.
Planned BOP test pressure:
Planned completion fluid:
3500 psi (the casing will be tested to 3500 psi)
Estimated 8.5 ppg Seawater / 6.8 ppg Diesel
.
Disposal
.
No annular injection in this well.
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-
04. Any metal cuttings will be sent to the North Slope Borough.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection.
Haul all Class I wastes to Pad 3 for disposal.
.
.
S-114 Permit to Drill 8/26/02
Page 4
) )
Drill and Complete Procedure Summary
Pre-RiQ Work:
1. Install 20" conductor.
2. Weld an FMC landing ring for the FMC Slim hole wellhead on the 20" conductor. Install two 4" side outlet
valves on the conductor pipe for surface cementing operations.
RiQ Operations:
1. MIRU Doyon 14. /'
2. Nipple up and function test diverter system. PU 5" DP to drill surface hole and stand back in derrick. ,/
3. MU 13-1/2" drilling assembly with MWD/GR and directionally drill surface hole to approximately 6152' MD 1
3381' TVD. The actual surfac~ole TD will be +1-100' TVD below the top of the SV1 sands.
4. Run and cement the 10-3/4", 45.5# surface casing back to surface. A port collar will be run in the casing to
allow for secondary cementing if cement is not circulated to surface during primary cementing operations.
5. NO diverter system and NU casing 1 tubing head. NU BOPE and test to 3500 psi. / /'
6. MU 9-7/8" drilling assembly with rebuilt PDC and MWD/GR/Res. RIH to float collar and test the 10-3/4" casing
to 3500 psi for 30 minutes.
7. Drill out shoe joints and displace well to LSND drilling fluid. Drill new formation to 20' below 10-3/4" shoe and
perform Leak Off Test.
8. Drill ahead as per directional plan to -100' TVD into the Colville shale. POH for bit and Den/Neu.
9. MU 9-7/8" drilling assembly with rerun PDC and MW DIG R/Res/Den/Neu. Drill ahead increasing mud weight
to 10.1 ppg prior to entering the HRZ and Kuparuk intervals. TD of this interval will be -150' MD below the
base Kuparuk, and is estimated at 16,036'1V1D 1 7268' TVD. Short trip as required and condition hole for
running casing. POH laying down drill pipe as required for running casing.
10. Run and cement the 7", /26# production casing as required to cover all significant hydrocarbon intervals
(current plans are to bring cement -1200' above top Kuparuk formation only). Displace the 7" casing with ,./
seawater during cementing operations and freeze protect the 7" x 10-3/4" annulus as required.
11. RU slick-line and run gau~ring 1 junk basket to PBTD.
12. Run a 4-1/2",12.6#, L-80 TC-II completion and space-out tubing tail -50' MD above top Kuparuk.
13. RU slick-line. RIH with standing valve and set i~XN' nipple below packer. Set packer and test the tubing to
3500 psi and annulus to 3500 psi for 30 minutes. Shear open RP valve in bottom GLM.
14. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
15. Freeze protect the well to -2400'. Secure the well. Rig down and move off.
Post-RiQ Work:
1. RU e-line and perforate the Kuparuk interval, using bottom most GLM to circulate guns down as required.
2. Pull RP shear valve from bottom GLM and install dummy valve.
3. Fracture stimulate Kuparuk and perform cleanout as required.
4. Install gas lift valves.
/
S-114 Permit to Drill 8/26/02
Page 5
)
")
Job 1: MIRU
Hazards and Contingencies
~ Four wells (8-104i, 8-105, S-106 and 8-201) will require shut-in for the 8-114 rig move. Both 8-105 and
8-106 are located -15' from the S-114 conductor and both 8-104i and 8-201 are -30' from S-114. Each
well requires wellhouse removal for the move in of Doyon 14. The wells will need to be shut-in at the
surface and the SSSV if present (see Close Proximity SOP listed below for details). All surface flowlines
and gas lift lines will be depressured to header pressure. Also, the swab valve on S-106 will need to be
removed to allow safe move in operations. The tree on 8-106 extends slightly higher than some of the
adjacent wells, and as is will not comfortably fit under the Doyon 14 substructure. Therefore, the swab
valve will be removed and a flange (with a gauge) installed on the 8SV. Discuss the move at a pre-job
safety meeting and designate a spotter to ensure there is no danger of a collision. All wells can be
brought back on production / injection once the move is complete.
~ 8 Pad is not designated as an H2S drill site, however Standard Operating Procedures for H2S precautions
should be followed at all times. Recent H28 data from the pad is as follows:
Adjacent producers at Surface:
S-105 less than 10 ppm
S-106 less than 10 ppm
Adjacent producers at TD:
S-106 less than 10 ppm
S-107 less than 10 ppm /
The maximum level of H2S recently recorded on the pad was -60 ppm from S-40A. The maximum
level ever recorded on the pad was -130 ppm from S-32 back in 3/2001. Both of these wells are
Ivishak producers while the above wells and subject well are Kuparuk wells.
'>-'"""''''''''''''''''''''''''''~'''''~~~~-",''''''~''''''''''''''''''''''',,,,,,",,'.'''>"''-W''''''''''"-'''''''"IW.'-~------
Job 2: Drill Surface Hole
Hazards and Contingencies
~ No fault crossings are expected in the surface interval of S-114.
~ Drilling Close Approach: All wells pass BP Close Approach guidelines under Major Risk rules for this
hole section, however there is one close approach well which limits allowable well path deviation to -4.4'.
The well is 8-106, and is -14' well-to-well at 425' MD. Note tolerance lines and allowable deviation from
the planned 8-114 well-path.
Also, a single shot gyro will be required in the surface hole due to magnetic interference of the close offset
wells. The single shots could be needed as deep as -1100' where we finally get adequate separation
from adjacent wells.
» Minimal hydrate gas has been encountered in the recent Aurora S-Pad development. In the few wells
where hydrate gas was reported, it was encountered within a range between the 8V3 and SV1 sands. S-
113 encountered gas cut mud at the top SV2, which cut the mud from 9.7 to 8.7 ppg (after this single
incident, no other gas cut mud was seen while drilling to TO below the SV1). The off-set well S-106,
encountered gas cut mud (most severe was from 9.3 to 8.0 ppg) at several different depths while drilling
within the lower SV sands. If encountered, hydrates will be minimized by treating the mud system with
Driltreat (Lecithin). Additional measures include reduced flow rates and keeping the mud temperature
cool «60 degrees if possible). Refer to Baroid mud recommendation.
S-114 Permit to Drill 8/26/02
Page 6
)
)
Job 3: Install 10%" Surface CasinQ
Hazards and Contingencies
~ It is critical that cement is circulated to surface for well integrity. 2250/0 excess cement through the
permafrost zone (and 400/0 excess below the permafrost) is planned. As contingency, a port collar will be
run in the casing at -1000' MD to allow circulating cement to surface if the single stage is unsuccessful.
,»»,,,,,,,,,,,,,*,,~,-,-,,-,~,,,"
Job 4: Drill Intermediate/Production Hole
Hazards and Contingencies
~ Four fault crossings have been identified in this hole section. As planned, the well will encounter the first
fault at -12,122' MD / 5170' TVD, within the Schrader 0 Sands. This fault looks to be very similar if not
the same fault that was crossed without incident while drilling the Schrader in S-113. The second and
third faults are expected within the Colville interval at -14,205' MD /5840' TVD and -14,927' MD / 6250'
TVD. These faults have not been crossed in off-set drilling, however based upon similar faults cut in S-
106 and S-113, lost circulation is considered to be a minor risk with both crossings. The fourth and final
fault is expected within the Kuparuk A Sand interval at -15,821' MD /7000' TVD, and is also expected to
have a minor risk of encountering losses. Nevertheless, have LCM products on location to treat any
losses encountered.
There is also a potential to encounter several small faults in the section 400' to 1000' TVD above the
Kuparuk. The well path crosses over a known fault in this area, however the seismic data in this area is
poor and any smaller faults in the area cannot be distinguished.
~ The Top Kuparuk target polygon has been sized to avoid faults to the north-east and south-west of the
well path. Therefore, consider the entire polygon as a hard-line and maintain directional control to hit
within the 'Drillers Polygon'.
~ Minor cuttings gas and gas cut mud has been fairly typical within the Ugnu and Schrader intervals. There
is a potential for these intervals to be over-pressured in some areas around S-Pad, however S-114 should
penetrate this section within an isolated fault block to the west where pressures are expected to be
normal. The recently completed S-113 well, drilled these intervals with a 9.4 to 9.5 ppg mud (south of
proposed path), and in July of 2001, S-107 (off-set well to the north) drilled the Ugnu and Schrader
intervals with 9.5 ppg mud and no signs of being underbalanced. Nevertheless monitor closely for any
signs of overpressure.
~ Differential sticking will be a problem if the drill string is left stationary for an extended period of time
across the long permeable sections of the Ugnu and Schrader Sands. Minimize the time the pipe is left
stationary.
~ Hole cleaning at high ROP's will be marginal in this large hole. For adequate hole cleaning flow rates
should be maintained in the 650+ gpm range and pipe RPM's maximized, particularly while drilling with
higher ROP's through the Ugnu and Schrader intervals.
» KICK TOLERANCE: Based upon the expected Kuparuk reservoir pressure of 9.8 ppg and a 10.1 ppg
mud, a 12.1 ppg leak-off will provide just over 50 bbls of kick tolerance. Contact Anchorage personnel
if LOT is less than 12.1 ppg. Based upon off-set drilling data on S-Pad, a minimum leak-off of 12.5 ppg
is expected at the 10-3/4" shoe and will provide -63 bbls of kick tolerance. An absolute worst case kick
tolerance for the 9-7/8" open hole section would be 32 bbls assuming a kick from the Kuparuk at -15,812'
MD / 7071' TVD. This is a worst case scenario based on a 10.0 ppg pore pressure gradient at the
Kuparuk A Sand, a fracture gradient of 12.0 ppg at the 10-3/4" shoe, gauge hole, and 1 0.0 ppg mud in the
hole.
» Drilling Close Approach: All wells pass BP Close Approach guidelines. The nearest close approach well
in this section is V-200, which is -471' welHo-well at -9822' MD in S-114.
----_._-'._.__.~'_.".._.._-
,.........--...-..--
S-114 Permit to Drill 8/26/02
Page 7
)
)
Job 6: Install 7" Lonastrina Casina
Hazards and Contingencies
)- Differential sticking is a concern across the long Ugnu and Schrader intervals. Communicate individual
responsibilities to all members of rig team and review connection and casing running practices to minimize
the time the pipe is left stationary.
)- At this location the Schrader interval is expected to be wet. Therefore, current plans are to cover only the
Kuparuk interval with cement. If the Schrader interval does encounter hydrocarbons which require cement
isolation, a light weight lead cement will be pumped to meet AOGCC requirements.
~ The well will be underbalanced after displacing the cement with Sea Water. Verify the floats are holding
prior to continuing operations. If floats are not holding, hold pressure and wait on cement.
,'t"',"f>"",,,~,,~,,,~,~~,,;»~'~'
~~~,«~~";»;;";,,,,~~.~,~
Job 12: Run Completion
Hazards and Contingencies
)- No hazards specific to this well have been identified for this phase of the well construction.
Job 13: ND/NU/Release Ria
Hazards and Contingencies
~ Diesel will be used to freeze protect the well. The diesel flash point is 1000 F. Diesel vapor pressure is -
0.1 psia at 1000 F.
~ See Job 1 for adjacent well spacing. Identify hazards in a pre move meeting, and take every precaution to
ensure good communication prior to beginning the rig move. Use spotters when moving the rig.
"""~~'",^",,"~.,..~~.
S-114 Permit to Drill 8/26/02
Page 8
TREE: 4-1/16" - 5M Carbon
WELLHEAD: 135/8" - 5M FMC SH
10-3/4",45.5 #/ft, L-80, BTC j
I 6152' I
7", 26 #/ft, L80, BTC-Mod
116,036' I ~
/
Date
8/26/02
Rev By
WSI
) )
S-114 Proposed Completion
I
I
L
4-1/2" tubing hanger
Cellar Elevation = 36.2'
Doyon 14 RKB = 70.5'
I 2350' I 4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 12.6# L-80 TC-II Tubing
~ /
4-1/2" Gas Lift Mandrels with handling pups installed.
GAS LIFT MANDRELS
# TVD Size Valve Type
L
1 3800' 1" DV
2 5600' 1" DV
3 6600' 1" RP Shear
L
4-1/2" Baker 'CM-D' sliding sleeve with 3.813" seal bore 10.
7" x 4-1/2" Baker 'S-3' Production Packer
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2"'XN' Landing Nipple with 3.813"seal bore and 3.725" No-Go 10.
4-1/2" Wire Line Entry Guide spaced-out -50' MD above the top Kuparuk.
Plug Back Depth I 15,950' I
~
Proposed Completion
Comments
Aurora
WELL: 5-114
API NO: 50-029-?????
BP Alaska Drilling & Wells
spef"1í'y-sUI1 North Slope Alaska
ÕRIL..L..ŒlL_sef:'..Y..lce~ BPXA
A Hot.b;¡l1on C<>"lp."y
Current Well Properties
Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure Reference:
Ref. Geographical Coordinates:
RKB Elevation:
S-114 WP15
5980820.17 N, 618929.73 E
52.14 S. 1012.31 E
70021' 22.5075" N, 149002' 02.8406" W
70.50ft above Mean Sea Level
70.50ft above Structure Reference
North Reference:
Units:
True North
Feet (US)
0
----Begin 13.1/2" Hole
- Begin Dlr @ 1.500o/100ft: 250.00ft MD, 250.00ft TVD
U&~Ø Gubik .wn.:¡nn 1VD
- - ~In:e:s=r :a: :::0~1:0::.~:M::.3:f~T:- - - - - - - - - '- -.
0000
Decrease In Dir Rate @ 1.7500/100ft: 1437.88ft MD, 1383.67ft TVD
1500 -
End Dlr, Start Sail @ 41.702° : 2049.44ftMD,1875.50ftTVD
- - - - - - - ..- - -- -- -- -- ..... ...... ------..- ......... ........ -- .......... J:v~sv..ü.ty()......
Be~n_D~52.o:!1~1!3!8~1!,~5~ --- - - -- - ~"¡;wr~"~>\!!!T;jp- -- - - -- - - - - -- - - - - - - - - - - - --
~~~4~~~5S Pad DrillQues{
Proposal Data for 5-114 WP15
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
Well
Well
ft
True North
Dogleg severity : Degrees per 100 feet (US)
Vertical Section Azimuth: 295.070°
Vertical Section Description: Well
Vertical Section Origin: 0.00 N,O.OO E
Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg
Depth Depth Secti on Rate
0.00 0.000 0.000 0.00 O.ooN 0.00 E 0.00
34.30 0.000 0.000 34.30 O.ooN O.ooE 0.00 0.000
250.00 OJ~)O 0.000 250.00 0.00 N 0.00 E 0.00 0.000
383.33 2.()OO 285.000 383.30 0.60N 2.25W 2.29 1.500
1437.88 31.000 285.000 1383.67 77.30 N 288.47 W 294.05 2.750
2049.44 41.702 285.000 1875.50 170.98 N 638.10 W 650.44 1.750
2183.38 41.702 285.000 1975.50 194.04 N 724.17 W 738.17 0.000
2875.72 71.705 295.328 2351.94 399.34 N 1256.89 W 1307.69 4.500
14116.42 71.705 295.328 5880.46 4965.05 N 10903.50 W 11980.11 0.000 '-...-'
15218.08 3 1.000 305.000 6555.00 5369.17 N 11640.83 W 12819.21 3.750
15468.19 30.000 305.000 6770.50 5441.98 N 11744.81 W 12944.25 0.400
15886.19 28.328 305.000 7135.50 5558.81 N 11911.67 W 13144.89 0.400
16036.19 27.728 305.000 7267.91 5599.24 N 11969.41 W 13214.32 0.400
~i~ s.!.a~@-!!:.7~~.~f~5.:!..~~ - - - - - ~vJ:. :Z"Q,ž2!!.J.:£P- - - - - - - - - - - - - - - - - - - - - - - - - - - -
..00 - - - - - - - - - - - -- - - - - - - _s~>~t'JJ!tL - -- - - - - - - -- -- - - - -..... - - - - - - --
-
ã>
~ 3000
.c
-
c..
()
0
-æ
u
:e
~ 4500 -
-- -- - -...... - --- - ~_..-. - -_sv~:s. :-1'an(1-~tuvll-- -- - - -- - - ~ - - - - - -- --- - - - -- - - --
OOQ.OO-- -- ------ - - -- SV2 3242-S~ -- -- -- -- ------ --- - - - - - ---
-- -
~~n!:!!!:..~I:. - -- _$J:LJ?~Il.,- - - - - - - - - - - - - - - - - - - - - - --
======~ ~= == == ~=---=~====
~ = "X- iJ.v-!f.vN'/.:'II..',"<:,'--Ii/\.'i.tli ;f(- ..YX"'!."iA"'XXL::t~ "ilm,J'M-)/ltlì,t,"" 'YN "vvX _,Illlt
-- ..m....." 11,"- ,
5 6000 -
0
L()
or-
II
..c
(,)
.S
OQ..- - - - ~$~~.~ - -- -- - - - - - - - - - - - - - - - --
--~~-----------------
.."....,^-^"':".:~::~'m '^ ,= M~C:~:~6ßQ::~T:ff;;~~O;~~:~:~O;'60tTVD ;; ;; ;; .~
~--;-~.oo .
~- - --2!.1!,B.\U''!!J"pC;)lv!¡¡oJ2.§¡>.6O!tTVD - - - - - --
8 12800.00
'114 WP1S
Begin Dir @ 3.7500/100ft: 14116.42ft MD, 5880.46ft TVD
I II -_'W'Y,VlN ",-v-,
Too CalviL!$; S<J:1~nv:~!Um(. 62SS.~O!tlVD ^^ A V '..-, ;N;;" v v , ...'.Yo..,.,.v."."-v
. ...~.3J~.CQIYiU4 C~HY.9t Slump.. 63.1(}'~Oft:rxp", "- II^ ^--"'.- -H- -,U. ,- -M 'II__"-"".,,.,ym' .."^,, -, >:., ,- on' II",\; -,-,- -, . 1-.'"
THf{~~- ~~~^~.,:~p;t rVO ,- "W ^ .,.,y. ww",v ""^ ^ "^ "/MM" ','w. v ^-, w.ww,,'''' ,- v,-^ ..
atitl?/rW?n~~!!3h!~:....~.r4~~.mt.lY.~?mmm " mmm ...unmun
llWP, !J?7Q.5Qft TV!>
L(;tJ. 6!!"!~).5ûft -rvo
. ~ ~n_.- - ..m.~Ü¡;~~iï" ~r.- 7õ1G.501l TV)"} JMl V.YlY.):;;;-YV&
., D~~r~~~~,'~~':~!r, Ra,~e ,! Ó.40~~~fo~¡E,i~~!~:~~f^~,Mþ;'~15~:~~~~i~~^ ^U~
S-1 14 T1b: 6rrri.Süft TVD, 544"1.98 N, 11'144.81 W ....,.-......
.. ~.~._m_m_n., u^ ^ ... ~.u......--.,...,.- .:,:¡ ~ .:: \ ._~ .~.....
8-114 Tin Dr> Poly @ 80%------""""
-.-,.--,.-----
Q.)
ëti
ð5 7500 -
--
0
Scale: 1 inch = 1500ft
I
1500
I
4500
I I
6000 7500
Vertical Section (Well)
I
9000
-Total Depth: 16036.19ftMD,7267.91ftTV[) 7" Liner
16036.1911 MD
7267.9111 TVD
I I I
10500 12000 13500
Section Azimuth: 295.070° (True North)
I
3000
"^"^W"""'W,- "w v
^^AM '1M"'"'' V W ..,- v
_"'^NII^..M'MW ..,.^" '01-'
----
5pE!f""f"'1~-5U" North Slope Alaska
ORIL.C1NG- ,J¡Ü-:.f:JV;J:eJ'Ui BPXA
þ, Hlmb'll1on eompl"V
4500 -
--
ëi5
~
'-'" 3000 -
CI)
0>
C
:!:
t
0
Z
.:t= 1500 -
0
0
LC)
....
II
.s:::
(,)
.£:;
(¡j
-æ
(,)
(j)
"'_11''''..--1. <"'\ f'\^ "',., n"'"
.~~~¡~.~rr~;t' :~:.
~ÕIib'
.~;::~
~i~
¿~"¡i;~ + t. .
,11:..'.....
..
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
Well
Well
ft
True North
PBU WOA S Pad D'.'-l'IQ'" '.' .t"
S-114 WP15 . .rl. ues
Proposal Data for 5-114 WP15
Dogleg severity: Degrees per 100 feet (US)
Vertical Section Azimuth: 295.070°
Vertical Section Description: Well 112
Vertical Section Origin: 0.00 N,O.OO E
Measured
Depth
0.00
34.30
250.00
383.33
1437.88
2049.44
2183.38
2875.72
14116.42
15218.08
15468.19
15886.19
16036.19
Incl.
0.000
0.000
0.000
2.000
31.000
41.702
41.702
71.705
71.705
31.000
30.000
28.328
27.728
~
7" Liner I.
16036.19ft MD
7267.9111 TVD
Total Depth: 16036.19ftMD,7267.91ftTVD
.......$-114 T1b Geo Poly
L:;,,,":""""'$-114 T1b DD Poly @ 80%
""~4 T1b: 677(1.5011 TVD, 5441.93 N, 11744.81 W
Decrease in Dlr Rate @ O.400./100ft: 15218.08ft MD, 6555.00ft TVD
Begin Dlr @ 3.750./100ft: 14116.42ft MD, 5880.46ft TVD
0
I I
-12000 -10500
Scale: 1 inch = 1500ft
Azim.
0.000
0.000
0.000
285.000
285.000
285.000
285.000
295.328
295.328
305.000
305.000
305.000
305.000
Vertical Northings Eastings Vertical Dogleg
Depth Section Rate
0.00 O.OON O.OOE 0.00
34.30 O.OON O.OOE 0.00 0.000
250.00 O.OON O.OOE 0.00 0.000
383.30 0.60N 2.25W 2.29 1.500
1383.67 77.30 N 288.47 W 294.05 2.750 '-..-ø'
1875.50 170.98 N 638.10 W 650.44 1.750
1975.50 194.04 N 724.17 W 738.17 --0.000
2351.94 399.34 N 1256.89 W 1307.69 4.500
5880.46 4965.05 N 10903.50 W 11980.11 0.000
6555.00 5369.17 N 11640.83 W ]2819.21 3.750
6770.50 5441.98 N 11744.81 W 12944.25 0.400
7135.50 5558.81 N 11911.67 W 13144.89 0.400
7267.91 5599.24 N 11969.41 W 13214.32 0.400
Current Well Properties
Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure Reference:
Ref. Geographical Coordinates:
RKB Elevation:
S-114 WP15
5980820.17 N, 618929.73 E
52.14 S, 1012.31 E
70° 21'22.5075" N, 149° 02' 02.8406" W
North Reference:
Units:
70.50ft above Mean Sea Level
70.50ft above Structure Reference
T rue North
Feet (US)
~
Begin 9-7/8" Hole
End Dir, Start Sail @ 71.705.: 2875.72ftMD,2351.94ftTV
Begin Djr @ 4.5000/100ft: 2183.381t MD, 1975.50ft TV
End Dir. Start Sail @ 41.702° : 2049.44ftMD,1875.50ftTV
Decrease in Dir Rate @ 1.750./100ft : 1437.88ft MD. 1383.67ft TV
Increase in Dir Rate @ 2.7500/10Oft : 383.33ft MD, 383.30ft TV~ ~~
Begin Dir @ 1.5000/100ft: 250.00ft MD, 250.00ft TV()- 000.00
Begin 13-1/2" HolE'
I
-9000
I
w7500
I
-6000
Eastings (Well)
I
-4500
I
-3000
I
-1500 0
Reference is True North
Alaska
B A
PBU_WOA S Pad, Slot Exp Slot 15
$-114 WPS - 5-114 WP15
Revised: 21 August, 2002
,tJ
'~
h
PROPOSAL REPORT
21 August, 2002
~
Surface Coordinates: 5980820.17 N, 618929.73 E (70021' 22.5075" N, 149002' 02.8406" W)
Surface Coordinates relative to Project H Reference: 980820.17 N, 118929.73 E (Grid)
Surface Coordinates relative to Structure Reference: 52.14 S, 1012.31 E (True)
Kelly Bushing: 70.50ft above Mean Sea Level
spe""'''''''Y-SUf1
ç:f~~.~.L. í~ § ~..J:t.Y IJ;.~.~
A Halliburton Company
Proposal Ref: pr011289
Sperry-Sun Drilling Services
Proposal Report for 5-114 WP5 - 5-114 WP15
Revised: 21 August, 2002
BPXA
North Slope Alaska PBU- WOA S Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) CO/100ft)
0.00 0.000 0.000 -70.50 0.00 O.OON 5980820.17 0.00 Begin 13-1/2" Hole
34.30 0.000 0.000 -36.20 34.30 O.OON 5980820.17 N 0.000 0.00
100.00 0.000 0.000 29.50 100.00 0.00 N 5980820.17 N 0.000 0.00
200.00 0.000 0.000 129.50 200.00 0.00 N 5980820.17 N 0.000 0.00
250.00 0.000 0.000 179.50 250.00 0.00 N 5980820.17 N 0.000 0.00 Begin Dir @ 1.5000/100ft: 250~
MD, 250.00ft TVD
300.00 0.750 285.000 229.50 300.00 5980820.25 N 618929.41 E 1.500 0.32
383.33 2.000 285.000 312.80 383.30 5980820.74 N 618927.47 E 1.500 2.29 Increase in Dír Rate @ 2.7500/100ft :
383.33ft MD, 383.30ft TVD
400.00 2.458 285.000 329.46 399.96 2.87W 5980820.89 N 618926.84 E 2.750 2.93
400.54 2.473 285.000 330.00 400.50 2.90W 5980820.90 N 618926.82 E 2.750 2.95 Base Gubik
500.00 5.208 285.000 429.23 499.73 9.33W 5980822.52 N 618920.36 E 2.750 9.51
600.00 7.958 285.000 528.56 599.06 20.40 W 5980825.31 N 618909.24 E 2.750 20.80
700.00 10.708 285.000 627.22 697.72 36.07 W 5980829.26 N 618893.51 E 2.750 36.76
800.00 13.458 285.000 725.00 795.50 56.29 W 5980834.36 N 618873.21 E 2.750 57.37
900.00 16.208 285.000 821.66 \;1;;892.16 81 .01 W 5980840.59 N 618848.38 E 2.750 82.58
1000.00 18.958 285.000 916.98 987.48 110.19W 5980847.94 N 618819.09 E 2.750 112.32
1100.00 21.708 285.000 1010.74 1081.24 38.52 N 143.75 W 5980856.40 N 618785.39 E 2.750 146.53
1200.00 24.458 285.000 1102.72 1173.22 48.66 N 181.62 W 5980865.94 N 618747.36 E 2.750 185.13
1300.00 27.208 285.000 1192.72 1263.22 59.94 N 223.70 W 5980876.55 N 618705.10 E 2.750 228.03
1400.00 29.958 285.000 1280.52 1351.02 72.32 N 269.91 W 5980888.20 N 618658.70 E 2.750 275.13
1437.88 31.000 285.000 1313.17 1383.67 77.30 N 288.47 W 5980892.88 N 618640.07 E 2.750 294.05 Decrease in Dír Rate @ 1.750< \:
1437.88ft MD, 1383.67ft TVD .~
1500.00 32.087 285.000 1366.11 1436.61 85.71 N 319.86 W 5980900.79 N 618608.55 E 1.750 326.04
1600.00 33.837 285.000 1450.01 1520.51 99.79 N 372.41 W 5980914.03 N 618555.78 E 1.750 379.61
1700.00 35.587 285.000 1532.21 1602.71 114.53 N 427.42 W 5980927.90 N 618500.55 E 1.750 435.68
1752.93 36.513 285.000 1575.00 1645.50 122.59 N 457.50 W 5980935.48 N 618470.34 E 1.750 466.35 SV6
1800.00 37.337 285.000 1612.63 1683.13 129.91 N 484.82 W 5980942.36 N 618442.91 E 1.750 494.19
1900.00 39.087 285.000 1691 .20 1761.70 145.92 N 544.57 W 5980957.42 N 618382.91 E 1.750 555.09
2000.00 40.837 285.000 1767.84 1838.34 162.54 N 606.60 W 5980973.06 N 618320.62 E 1.750 618.33
2049.44 41.702 285.000 1805.00 1875.50 170.98 N 638.10 W 5980981.00 N 618288.99 E 1.750 650.44 End Dír, Start Sail @ 41.702° :
2049.44ftMD, 1875.50ftTVD
2100.00 41.702 285.000 1842.75 1913.25 179.68 N 670.59 W 5980989.19 N 618256.37 E 0.000 683.55
2116.41 41.702 285.000 1855.00 1925.50 182.51 N 681.14 W 5980991 .84 N 618245.78 E 0.000 694.30 Base Permafrost
21 August, 2002 - 13:55 Page 2 of 13 DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report forS~114 WPS ~ S~114 WP15
Revised: 21 August, 2002
BPXA
North Slope Alaska PBU_WOAS Pad
Measured Sub~Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) C /1 OOft)
2183.38 41.702 285.000 1905.00 1975.50 194.04 N 724.17 W 5981002.69 N 618202.57 E 0.000 738.17 Begin Dir @ 4.5000/100ft : 2183.38ft
MD, 1975.50ft TVD
2200.00 42.409 285.365 1917.34 1987.84 196.96 N 734.92 W 5981005.43 N :~I;~ 91.78 E 4.500 749.14
2300.00 46.684 287.371 1988.60 2059.10 216.76 N 802.19 W 5981024.17 N 24.20 E 4.500 818.46
2400.00 50.989 289.111 2054.41 2124.91 240.36 N 5981046.63 N 618052.37 E 4.500 893.19 '-.-r
2500.00 55.318 290.651 2114.36 2184.86 267.59 N 5981072.66 N 617976.72 E 4.500 972.87
2600.00 59.663 292.038 2168.09 5981102.12 N 617897.73 E 4.500 1057.00
2644.68 61.609 292.617 2190.00 5981116.34 N 617861.49 E 4.500 1095.89 SV5
2700.00 64.022 293.306 2215.27 5981134.82 N 617815.88 E 4.500 1145.07
2800.00 68.391 294.484 2255.61 5981170.56 N 617731.67 E 4.500 1236.52
2875.72 71 .705 295.328 2281.44 5981199.50 N 617666.66 E 4.500 1307.69 End Dir, Start Sail @ 71.705° :
2875. 72ftM D ,2351.94ftTVD
2900.00 71.705 295.328 2289.06 409.20 N 1277.73 W 5981209.03 N 617645.67 E 0.000 1330.74
3000.00 71 .705 295.328 2320.46 449.82 N 1363.54 W 5981248.28 N 617559.22 E 0.000 1425.68
3100.00 71 .705 295.328 2351.85 490.43 N 1449.36 W 5981287.53 N 617472.76 E 0.000 1520.63
3189.69 71.705 295.328 2380.00 526.86 N 1526.33 W 5981322.73 N 617395.22 E 0.000 1605.78 SV4
3200.00 71.705 295.328 2383.24 531.05 N 1535.18 W 5981326.78 N 617386.31 E 0.000 1615.57
3300.00 71.705 295.328 2414.63 2485.13 571 .67 N 1621.00 W 5981366.03 N 617299.86 E 0.000 1710.52
3400.00 71.705 295.328 2446.02 2516.52 612.29 N 1706.82 W 5981405.28 N 617213.41 E 0.000 1805.46
3500.00 71 .705 295.328 2477.41 2547.91 652.90 N 1792.64 W 5981444.53 N 617126.95 E 0.000 1900.41
3600.00 71.705 295.328 2508.80 2579.30 693.52 N 1878.46 W 5981483.78 N 617040.50 E 0.000 1995.35
3700.00 71 .705 295.328 2540.19 2610.69 734.14 N 1964.27 W 5981523.03 N 616954.05 E 0.000 2090.30
~
3800.00 71.705 295.328 2571 .58 2642.08 774.76 N 2050.09 W 5981562.28 N 616867.59 E 0.000 2185.24
3900.00 71.705 295.328 2602.97 2673.47 815.38 N 2135.91 W 5981601.53 N 616781.14 E 0.000 2280.18
4000.00 71.705 295.328 2634.36 2704.86 855.99 N 2221.73 W 5981640.78 N 616694.69 E 0.000 2375.13
4100.00 71.705 295.328 2665.75 2736.25 896.61 N 2307.55 W 5981680.03 N 616608.24 E 0.000 2470.07
4200.00 71.705 295.328 2697.14 2767.64 937.23 N 2393.37 W 5981719.28 N 616521 .78 E 0.000 2565.02
4300.00 71 .705 295.328 2728.53 2799.03 977.85 N 2479.19 W 5981758.53 N 616435.33 E 0.000 2659.96
4304.68 71 .705 295.328 2730.00 2800.50 979.75 N 2483.20 W 5981760.37 N 616431.29 E 0.000 2664.40 SV3
4400.00 71.705 295.328 2759.92 2830.42 1018.46 N 2565.01 W 5981797.78 N 616348.88 E 0.000 2754.91
4500.00 71.705 295.328 2791.31 2861.81 1059.08 N 2650.82 W 5981837.03 N 616262.43 E 0.000 2849.85
4600.00 71.705 295.328 2822.70 2893.20 1099.70 N 2736.64 W 5981876.28 N 616175.97 E 0.000 2944.80
21 August, 2002 ~ 13:55
Page 3 of 13
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for $-114 WP$ - $-114 WP15
Revised: 21 August, 2002
BPXA
North Slope Alaska PBU_WOAS Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
4700.00 71.705 295.328 2854.09 2924.59 1140.32 N 2822.46 W 5981915.!:)~ N 616089.52 E 0.000 3039.74
4750.67 71.705 295.328 2870.00 2940.50 1160.90 N 2865.95 W 5981935.42 N 045.72 E 0.000 3087.85 SV2
4800.00 71.705 295.328 2885.48 2955.98 1180.93 N 2908.28 W 5981954.78 N 03.07 E 0.000 3134.68
4900.00 71.705 295.328 2916.88 2987.38 1221.55 N 2994.10 W 5981994.03 N 16.62 E 0.000 3229.63
5000.00 71.705 295.328 2948.27 3018.77 1262.17 N 3 5982033.28 N 615830.16 E 0.000 3324.57 ~'
5100.00 71.705 295.328 2979.66 3050.16 5982072.53 N 615743.71 E 0.000 3419.52
5200.00 71.705 295.328 3011 .05 3081.55 3 5982111 .78 N 615657.26 E 0.000 3514.46
5300.00 71.705 295.328 3042.44 3112.94 3 5982151.03 N 615570.81 E 0.000 3609.41
5400.00 71.705 295.328 3073.83 3144.33 3423.19 W 5982190.28 N 615484.35 E 0.000 3704.35
5500.00 71.705 295.328 3105.22 3175.72 3509.01 W 5982229.53 N 615397.90 E 0.000 3799.30
5600.00 71 .705 295.328 3136.61 3207.11 3594.83 W 5982268.78 N 615311.45 E 0.000 3894.24
5700.00 71.705 295.328 3168.00 3238.50 3680.65 W 5982308.03 N 615224.99 E 0.000 3989.18
5800.00 71.705 295.328 3199.39 3269.89 3766.47 W 5982347.28 N 615138.54 E 0.000 4084.13
5833.80 71.705 295.328 3210.00 3280.50 3795.47 W 5982360.55 N 615109.32 E 0.000 4116.22 SV1
5900.00 71.705 295.328 3230.78 3301.28 3852.28 W 5982386.53 N 615052.09 E 0.000 4179.07
, :~:::~:l:/ ~.
6000.00 71.705 295.328 3262.17 3332.67 1668.35 N 3938.10 W 5982425.78 N 614965.64 E 0.000 4274.02
6100.00 71.705 295.328 3293.56 3364.06 1708.96 N 4023.92 W 5982465.04 N 614879.18 E 0.000 4368.96
6152.37 71 .705 295.328 3310.00 3380.50 1730.23 N 4068.86 W 5982485.59 N 614833.91 E 0.000 4418.68 Begin 9-7/8" Hole
10 3/4" Casing
6200.00 71.705 295.328 3324.95 3395.45 1749.58 N 4109.74 W 5982504.29 N 614792.73 E 0.000 4463.91
6300.00 71.705 295.328 3356.34 3426.84 1790.20 N 4195.56 W 5982543.54 N 614706.28 E 0.000 4558.85
6400.00 71.705 295.328 3387.73 3458.23 1830.82 N 4281.38 W 5982582.79 N 614619.83 E 0.000 4653.80 \--,
6500.00 71 .705 295.328 3419.12 3489.62 1871.44 N 4367.20 W 5982622.04 N 614533.37 E 0.000 4748.74
6600.00 71.705 295.328 3450.51 3521.01 1912.05 N 4453.01 W 5982661.29 N 614446.92 E 0.000 4843.68
6693.93 71.705 295.328 3480.00 3550.50 1950.21 N 4533.62 W 5982698.15 N 614365.72 E 0.000 4932.87 UG4
6700.00 71.705 295.328 3481.91 3552.41 1952.67 N 4538.83 W 5982700.54 N 614360.47 E 0.000 4938.63
6789.50 71.705 295.328 3510.00 3580.50 1989.02 N 4615.64 W 5982735.66 N 614283.09 E 0.000 5023.60 UG4A
6800.00 71.705 295.328 3513.30 3583.80 1993.29 N 4624.65 W 5982739.79 N 614274.02 E 0.000 5033.57
6900.00 71 .705 295.328 3544.69 3615.19 2033.91 N 4710.47 W 5982779.04 N 614187.56 E 0.000 5128.52
7000.00 71.705 295.328 3576.08 3646.58 2074.52 N 4796.29 W 5982818.29 N 614101.11 E 0.000 5223.46
7100.00 71.705 295.328 3607.47 3677.97 2115.14 N 4882.11 W 5982857.54 N 614014.66 E 0.000 5318.41
21 August, 2002 - 13:55
Page 4 of 13
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for 5.114 WP5 - 5.114 WP15
Revised: 21 August, 2002
BPXA
North Slope Alaska PBU_WOAS Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) e/100ft)
7200.00 71 .705 295.328 3638.86 3709.36 2155.76 N 4967.93 W 5982896.79 928.20 E 0.000 5413.35
7300.00 71 .705 295.328 3670.25 3740.75 2196.38 N 5053.74 W 5982936.04 N 841.75 E 0.000 5508.30
7400.00 71 .705 295.328 3701.64 3772.14 2237.00 N 5139.56 W 5982975.29 N 55.30 E 0.000 5603.24
7500.00 71 .705 295.328 3733.03 3803.53 2277.61 N 5225.38 W 5983014.54 N 68.85 E 0.000 5698.18
7600.00 71.705 295.328 3764.42 3834.92 2318.23 N 5 5983053.79 N 613582.39 E 0.000 5793.13 '-..-r
7700.00 71.705 295.328 3795.81 3866.31 5983093.04 N 613495.94 E 0.000 5888.07
7800.00 71 .705 295.328 3827.20 3897.70 5 5983132.29 N 613409.49 E 0.000 5983.02
7872.63 71 .705 295.328 3850.00 3920.50 5 5983160.79 N 613346.70 E 0.000 6051.98 UG3
7900.00 71 .705 295.328 3858.59 3929.09 5568.66 W 5983171.54 N 613323.04 E 0.000 6077.96
8000.00 71.705 295.328 3889.98 3960.48 5654.48 W 5983210.79 N 613236.58 E 0.000 6172.91
8100.00 71 .705 295.328 3921.37 3991.87 5740.29 W 5983250.04 N 613150.13 E 0.000 6267.85
8200.00 71.705 295.328 3952.76 402~.26 5826.11 W 5983289.29 N 613063.68 E 0.000 6362.80
8300.00 71.705 295.328 3984.15 4054.65 5911 .93 W 5983328.54 N 612977.23 E 0.000 6457.74
8400.00 71 .705 295.328 4015.54 4086.04 5997.75 W 5983367.79 N 612890.77 E 0.000 6552.69
8500.00 71 .705 295.328 4046.94 4117.44 6083.57 W 5983407.04 N 612804.32 E 0.000 6647.63
8600.00 71 .705 295.328 4078.33 4148.83 2724.41 N 6169.39 W 5983446.29 N 612717.87 E 0.000 6742.57
8700.00 71 .705 295.328 4109.72 4180.22 2765.03 N 6255.21 W 5983485.54 N 612631.41 E 0.000 6837.52
8800.00 71 .705 295.328 4141.11 4211 .61 2805.64 N 6341.02 W 5983524.79 N 612544.96 E 0.000 6932.46
8900.00 71 .705 295.328 4172.50 4243.00 2846.26 N 6426.84 W 5983564.04 N 612458.51 E 0.000 7027.41
9000.00 71.705 295.328 4203.89 4274.39 2886.88 N 6512.66 W 5983603.29 N 612372.06 E 0.000 7122.35
9100.00 71 .705 295.328 4235.28 4305.78 2927.50 N 6598.48 W 5983642.54 N 612285.60 E 0.000 7217.30
9200.00 71.705 295.328 4266.67 4337.17 2968.11 N 6684.30 W 5983681.79 N 612199.15 E 0.000 7312.24 '-ç
9300.00 71 .705 295.328 4298.06 4368.56 3008.73 N 6770.12 W 5983721.04 N 612112.70 E 0.000 7407.19
9400.00 71.705 295.328 4329.45 4399.95 3049.35 N 6855.94 W 5983760.29 N 612026.25 E 0.000 7502.13
9433.61 71.705 295.328 4340.00 4410.50 3063.00 N 6884.78 W 5983773.48 N 611997.19E 0.000 7534.04 UG1
9500.00 71 .705 295.328 4360.84 4431 .34 3089.97 N 6941.75 W 5983799.54 N 611939.79 E 0.000 7597.07
9600.00 71.705 295.328 4392.23 4462.73 3130.58 N 7027.57 W 5983838.79 N 611853.34 E 0.000 7692.02
9700.00 71 .705 295.328 4423.62 4494.12 3171.20 N 7113.39 W 5983878.04 N 611766.89 E 0.000 7786.96
9800.00 71.705 295.328 4455.01 4525.51 3211.82 N 7199.21 W 5983917.29 N 611680.44 E 0.000 7881 .91
9900.00 71.705 295.328 4486.40 4556.90 3252.44 N 7285.03 W 5983956.54 N 611593.98 E 0.000 7976.85
21 August, 2002. 13:55
Page 5 of 13
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for 5-114 WP5 - 5-114 WP15
Revised: 21 August, 2002
BPXA
North Slope Alaska PBU_WOAS Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 oott)
10000.00 71.705 295.328 4517.79 4588.29 3293.06 N 7370.85 W 5983995.1'9 507.53 E 0.000 8071 .80
10100.00 71 .705 295.328 4549.18 4619.68 3333.67 N 7456.67 W 5984035.04 N 421.08 E 0.000 8166.74
10200.00 71 .705 295.328 4580.57 4651.07 3374.29 N 7542.48 W 5984074.29 N 34.63 E 0.000 8261.69
10230.03 71 .705 295.328 4590.00 4660.50 3386.49 N 7568.25 W 5984086.08 N 08.67 E 0.000 8290.19 MalTop SB
10300.00 71.705 295.328 4611.97 4682.47 3414.91 N 7 5984113.54 N 611248.17 E 0.000 8356.63 -~
10400.00 71 .705 295.328 4643.36 4713.86 5984152.79 N 611161.72 E 0.000 8451.57
10500.00 71.705 295.328 4674.75 4745.25 5984192.04 N 611075.27 E 0.000 8546.52
10600.00 71 .705 295.328 4706.14 4776.64 78 5984231.29 N 610988.81 E 0.000 8641 .46
10700.00 71 .705 295.328 4737.53 4808.03 7971 .58 W 5984270.54 N 610902.36 E 0.000 8736.41
10800.00 71 .705 295.328 4768.92 4839.42 8057.40 W 5984309.79 N 610815.91 E 0.000 8831 .35
10900.00 71 .705 295.328 4800.31 4870.81 8143.22 W 5984349.04 N 610729.46 E 0.000 8926.30
10962.73 71.705 295.328 4820.00 4890.50 .10 N 8197.05 W 5984373.66 N 610675.22 E 0.000 8985.86 sa N Sands
11000.00 71 .705 295.328 4831.70 4902.20 .. 3699.23 N 8229.03 W 5984388.29 N 610643.00 E 0.000 9021 .24
11100.00 71.705 295.328 4863.09 4933.59 3739.85 N 8314.85 W 5984427.54 N 610556.55 E 0.000 9116.19
11200.00 71 .705 295.328 4894.48 4964.98 3780.47 N 8400.67 W 5984466.79 N 610470.10 E 0.000 9211.13
11300.00 71.705 295.328 4925.87 4996.37 3821.09 N 8486.49 W 5984506.04 N 610383.65 E 0.000 9306.07
11345.01 71.705 295.328 4940.00 5010.50 3839.37 N 8525.12 W 5984523.71 N 610344.73 E 0.000 9348.81 sa 0 Sands
11400.00 71.705 295.328 4957.26 5027.76 3861.70 N 8572.31 W 5984545.29 N 610297.19 E 0.000 9401 .02
11500.00 71.705 295.328 4988.65 5059.15 3902.32 N 8658.13 W 5984584.54 N 610210.74 E 0.000 9495.96
11600.00 71.705 295.328 5020.04 5090.54 3942.94 N 8743.95 W 5984623.79 N 610124.29 E 0.000 9590.91
11700.00 71 .705 295.328 5051.43 5121.93 3983.56 N 8829.76 W 5984663.04 N 610037.84 E 0.000 9685.85 ~
11800.00 71 .705 295.328 5082.82 5153.32 4024.17 N 8915.58 W 5984702.29 N 609951.38 E 0.000 9780.80
11900.00 71.705 295.328 5114.21 5184.71 4064.79 N 9001 .40 W 5984741.54 N 609864.93 E 0.000 9875.74
12000.00 71.705 295.328 5145.60 5216.10 4105.41 N 9087.22 W 5984780.79 N 609778.48 E 0.000 9970.69
12100.00 71 .705 295.328 5176.99 5247.49 4146.03 N 9173.04 W 5984820.04 N 609692.02 E 0.000 10065.63
12200.00 71.705 295.328 5208.39 5278.89 4186.65 N 9258.86 W 5984859.29 N 609605.57 E 0.000 10160.57
12205.14 71.705 295.328 5210.00 5280.50 4188.73 N 9263.27 W 5984861.31 N 609601.13 E 0.000 10165.46 Obf Baserrop Colville
12300.00 71.705 295.328 5239.78 5310.28 4227.26 N 9344.68 W 5984898.54 N 609519.12 E 0.000 10255.52
12400.00 71 .705 295.328 5271.17 5341 .67 4267.88 N 9430.49 W 5984937.79 N 609432.67 E 0.000 10350.46
12500.00 71.705 295.328 5302.56 5373.06 4308.50 N 9516.31 W 5984977.04 N 609346.21 E 0.000 10445.41
21 August, 2002 - 13:55
Page 6 of 13
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for 5-114 WP5 - 5-114 WP15
Revised: 21 August, 2002
BPXA
North Slope Alaska PBU_WOAS Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
12600.00 71 .705 295.328 5333.95 5404.45 4349.12 N 9602.13 W 5985016.~,~ 0.000 10540.35
12700.00 71 .705 295.328 5365.34 5435.84 4389.73 N 9687.95 W 5985055.54 N 0.000 10635.30
12800.00 71 .705 295.328 5396.73 5467.23 4430.35 N 9773.77 W 5985094.79 N 0.000 10730.24
12900.00 71.705 295.328 5428.12 5498.62 4470.97 N 9859.59 W 5985134.04 N 0.000 10825.19
13000.00 71.705 295.328 5459.51 5530.01 4511.59 N 9 5985173.29 N 0.000 10920.13 '- "
13100.00 71 .705 295.328 5490.90 5561.40 5985212.54 N 608827.50 E 0.000 11015.07
13200.00 71.705 295.328 5522.29 5592.79 5985251.79 N 608741.05 E 0.000 11110.02
13300.00 71 .705 295.328 5553.68 5624.18 5985291.04 N 608654.59 E 0.000 11204.96
13400.00 71 .705 295.328 5585.07 5655.57 5985330.29 N 608568.14 E 0.000 11299.91
13500.00 71 .705 295.328 5616.46 5686.96 5985369.54 N 608481.69 E 0.000 11394.85
13600.00 71 .705 295.328 5647.85 5718.35 10460.32 W 5985408.79 N 608395.24 E 0.000 11489.80
13700.00 71 .705 295.328 5679.24 5749.74 10546.14 W 5985448.04 N 608308.78 E 0.000 11584.74
13800.00 71.705 295.328 5710.63 5781.13 10631.95 W 5985487.30 N 608222.33 E 0.000 11679.69
13900.00 71 .705 295.328 5742.02 5812.52 10717.77 W 5985526.55 N 608135.88 E 0.000 11774.63
14000.00 71 .705 295.328 5773.42 5843.92 10803.59 W 5985565.80 N 608049.42 E 0.000 11869.57
14100.00 71.705 295.328 5804.81 5875.31 4958.38 N 10889.41 W 5985605.05 N 607962.97 E 0.000 11964.52
14116.42 71 .705 295.328 5809.96 5880.46 4965.05 N 10903.50 W 5985611.49 N 607948.78 E 0.000 11980.11 Begin Dir @ 3.7500/100ft: 14116.42t
MD, 5880.46ft TVD
14200.00 68.598 295.769 5838.33 5908.83 4998.95 N 10974.42 W 5985644.26 N 607877.33 E 3.750 12058.71
14300.00 64.883 296.322 5877.82 5948.32 5039.28 N 11056.95 W 5985683.27 N 607794.17 E 3.750 12150.55
14400.00 61.170 296.910 5923.17 5993.67 5079.19 N 11136.62 W 5985721.91 N 607713.88 E 3.750 12239.63
14500.00 57.459 297.542 5974.19 6044.69 5118.52 N 11213.08W 5985760.02 N 607636.80 E 3.750 12325.55 ~
14600.00 53.752 298.228 6030.67 6101.17 5157.10 N 11286.01 W 5985797.44 N 607563.27 E 3.750 12407.95
14700.00 50.050 298.982 6092.36 6162.86 5194.75 N 11355.09 W 5985833.99 N 607493.60 E 3.750 12486.48
14800.00 46.352 299.823 6159.00 6229.50 5231.33 N 11420.03 W 5985869.54 N 607428.08 E 3.750 12560.81
14837.20 44.978 300.162 6185.00 6255.50 5244.63 N 11443.08 W 5985882.47 N 607404.83 E 3.750 12587.32 Top Colville Canyon Slump
14900.00 42.662 300.774 6230.31 6300.81 5266.67 N 11480.55 W 5985903.91 N 607367.01 E 3.750 12630.60
14992.30 39.264 301 .778 6300.00 6370.50 5298.07 N 11532.27 W 5985934.48 N 607314.80 E 3.750 12690.75 Base Colville Canyon Slump
15000.00 38.981 301 .868 6305.97 6376.47 5300.63 N 11536.40 W 5985936.98 N 607310.63 E 3.750 12695.57
15100.00 35.311 303.151 6385.67 6456.17 5333.05 N 11587.33 W 5985968.59 N 607259.20 E 3.750 12755.44
15200.00 31.658 304.688 6469.06 6539.56 5363.80 N 11633.12 W 5985998.60 N 607212.92 E 3.750 12809.95
21 August, 2002 - 13:55
Page 7 of 13
DrillQuest 2.00.09.006
North Slope Alaska
Measured Sub-Sea Vertical
Depth IncJ. Azim. Depth Depth
(ft) (ft) (ft)
15218.08 31.000 305.000 6484.50 6555.00
15218.66 30.998 305.000 6485.00 6555.50
15300.00 30.672 305.000 6554.84 6625.34
15400.00 30.273 305.000 6641 .03 6711 .53
15433.52 30.139 305.000 6670.00 6740.50
15468.19 30.000 305.000 6700.00 6770.50
15500.00 29.873 305.000 6727.57 6798.07
15600.00 29.473 305.000 6814.46 6884.96
15698.07 29.080 305.000 6900.00 6970.50
15700.00 29.073 305.000 6901 .69 6972.19
15800.00 28.673 305.000 6989.26 7059.76
15812.24 28.624 305.000 7000.00 7070.50
15886.19 28.328 305.000 7065.00 7135.50
15900.00 28.273 305.000 7077.16 'ij'147.66
16000.00 27.873 305.000 7165.39 7235.89
16036.19 27.728 305.000 7197.41 7267.91
Sperry-Sun Drilling Services
Proposal Report for 5-114 WP5 - 5-114 WP15
. Revised: 21 August, 2002
BPXA
PBU_WOAS Pad
Local Coordinates Dogleg Vertical
Northings Eastings Rate Section Comment
(ft) (ft) CO/1 OOft)
5369.17 N 11640.83 W 3.750 12819.21 Decrease in Dir Rate @ 0.4000/100ft :
15218.08ft MD, 6555.00ft TVD
5369.34 N 5986004.02 N 00400 12819.50 THRZ
5393.26 N 5986027.39 N 0.400 12860.57
5422.34 N 5986055.81 N 0.400 12910.53 --j
5432.02 N 5986065.26 N 0.400 12927.14 BHRzrrop Kalubik
5986075.00 N 607100.00 E 0.400 12944.25 TKUP
Target - S-114 T1 b Geo Poly, Geologic
11757.82 W 5986083.90 N 607086.85 E 0.400 12959.88
11798.37 W 5986111.65 N 607045.85 E 0.400 13008.65
11837.66 W 5986138.53 N 607006.14 E 0.400 13055.89 LCU
11838.42 W 5986139.05 N 607005.36 E 0.400 13056.81
5535.22 N 11877.98 W 5986166.12 N 606965.37 E 0.400 13104.37
5538.59 N 11882.78 W 5986169.41 N 606960.51 E 0.400 13110.16 Kuparuk A5
5558.81 N 11911 .67 W 5986189.17 N 606931.31 E 0.400 13144.89 TMLV
5562.57 N 11917.03 W 5986192.84 N 606925.89 E 0.400 13151.33
5589.56 N 11955.58 W 5986219.21 N 606886.92 E 0.400 13197.69
5599.24 N 11969.41 W 5986228.68 N 606872.94 E 0.400 13214.32 Total Depth:
16036.19ftMD,7267.91ftTVD
7" Liner
~
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well 112. Northings and Eastings are relative to Well 112.
Magnetic Declination at Surface is 26.098° (21-Aug-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well 112 and calculated along an Azimuth of 295.070° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 16036.19ft.,
The Bottom Hole Displacement is 13214.32ft., in the Direction of 295.070° (True).
21 August, 2002 -13:55
Page 8 of 13
DrillQuest 2.00.09.006
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
DATE CHECK NO.
8/01/02 H207037
VENDOR
DISCOUNT NET
$100.00 H
'j
H 207037
8/01/02
CK073102D
Permit to Drill Fee
S -lllf
RECEI\IEI)
AUG 2 6 2002
PIs contact Sandra Stewman X475C
for check pickup
"-,'
Alaska (JiI & Gas Cons. Gmnmlssior¡
Ant:horage
TOTAL ~
$100.00
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
III 20 70 ~ 7111 1:0.... 20 ~B q 51: DaB"''''. qlll
No. H 20.703.7
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612 .
ANCHORAGE, ALASKA99519-6612
PAY
~~'
TO THE Alaska Oil&Gås CQ!lservätiQ~
ORDER 333 W<7tq..Ave~ 'StelOO '
OF Ancq.Òragé, A1);' 99501
)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME /Jß u s -' // 'I
2.n:/ - 17 '!?
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
HOLE
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\jody\templates
"CLUE"
The permit is for a newwellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function. of the original API number stated
above.
In accordance with 20 AAC 25.005(t), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WELL PERMIT CHECKLIST COMPANY A.I' X WELL NAME ¡'AU .5 - // $I PROGRAM: Exp - Dev ~ Redrll- Re-Enter - Serv - Wellbore seg-
FIELD & POOL h~ðl.2.ð INITCLASS O'-1~ /-d/I GEOLAREA ~/ó UNIT# //6.~c-') ON/OFFSHORE~v
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . ý'1 N
2. Lease number appropriate. . . .. . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . ~ N
(Service Well Only) 13. Well located w/in area & strata authorized by injection order #- yy. . /UJ 4.
(Service Well Only) 14. All wells w/in X mile area of review identified. . . . . . . . .. /' N
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . ,. tV. Nto If @ 115 (.
16. Surface casing protects all known USDWs. . . . . . . . . . . éi! N .A . ..J- -
17. CMT vol adequate to circulate on conductor & surf csg. . . . . ti2 N G-Ðe¿¡...tL..-lvU æ-iJ:Rçç.
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y d$E ()
19. CMT will cover all known productive horizons. . . . . . . . . . ~ N
20. Casing designs adequate for C, T, B & permafrost. . .. . . . . .. N D II" I
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . . N ItÞvJ~ '-t,
22. If a re-drill, has a 10-403 for abandonment been approved. . . Y N AtIPt-
23. Adequate wellbore separation proposed.. . . . . . . . . . . . . N
24. If diverter required, does it meet regulations. . . . . . . . . . N
25. Drilling fluid program schematic & equip list adequate. . . . . N
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N I
APPR DATE 27. BOPE press rating appropriate; test to 3SOo psig. N m~P 'Zq 25 pi è, .
11- 1 I 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
"-"'" ¡ [f.4'{ OL 29. Work will occur without operation shutdown. . . . . . . . . . . ~N.-.
30. Is presence of H2S gas probable... . . . . . . . . . . . . . . &0 !'Píri-,k... S. -r4oÄ- (J"{~ILJ .
31. Mechanical condition of wells within AOR verified. . . . . . . . - Ai (k
32. Permit can be issued w/o hydrogen sulfide measures. . . . . e N
33. Data presented on potential overpressure zones. . . . . . . . Æ /J
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . N /f./, n .
35. Seabed condition survey (if off-shore). . . . . . . . . . . . . . Y N
36. Contact name/phone for weekly progress reports. . . . . . . . Y N
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER
RPrlflt. TEM JDH J~ JBR
APPR DATE
.IeL- ~ ~2-
(Service Well Only)
GEOLOGY
APPR DATE
R/(". q ¡4~j,2-
(Exploratory Only)
Rev: 07/12/02
)
I
COMMISSIONER:
CommentsJlnstructions:
SFD-
WGA \J.16/!r
COT I I
DTS Cþ <.? 0 ¿
MJW
G:\geology\perm its\checklist.doc
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special. effort has been made to chronologically
organize this category of information.
)
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Mar 19 13:02:47 2003
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/03/19
Origin. . . . . . . . . . . . .. . . . . . ST S
Reel Name............... - UNKNOWN
Continuation Nurober......01
Previous Reel Name.......UNKNOWN
Comments.................STS LIS
Tape Header
Service name.............LISTPE
Date.....................03/03/19
Origin. . . . . . . . . . . .. . . . . . . STS
Tape Name................UNKNOWN
Continuation Nurober......01
Previous Tape Name.~.....UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Physical EOF
Comment Record
TAPE HEADER
Aurora
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW2215200000
C. EWING
L. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW2215200000
C.A. DEMOSKI
A. MADSEN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
)
...
Writing Library.
Scientific Technical Services
Writing Library. Scientific Technical Services
S-114
500292311600
BP Exploration Alaska
Sperry-Sun Drilling Services
19-MAR-03
MWD RUN 2
MW2215200000
C. EWING
L. VAUGHN
MWD RUN 3
MW2215200000
C.A. DEMOSKI
A. MADSEN
MAD RUN 4
MW2215200000
C.A. DEMOSKI
A. MADSEN
35
12N
12E
4617
4496
70.20
36.20
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
13.500 20.000 115.0
9.875 10.750 6140.0
#
REMARKS:
aŒ-/75
11107,5
)
)
1. ALL DEPTHS ARE BIT DEPTHS UNLESS O'l'HERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2.
ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1 & 2 COMPRISED DIRECTIONAL WITH NATURAL
GAMMA PROBE (NGP),
UTILIZING SCINTILLATION DETECTORS.
4. MWD RUN 3 COMPRISED
(DGR) UTILIZING
GEIGER-MUELLER TUBE
RESISTIVITY -
PHASE 4 (EWR4): AND
DIRECTIONAL WITH DUAL GAMMA RAY
DETECTORS; ELECTROMAGNETIC WAVE
PRESSURE WHILE DRILLING (PWD). '
5. MWD RUN 4 COMPRISED DIRECTIONAL WITH DGR: EWR4: PWD:
COMPENSATED THERMAL
NEUTRON POROSITY (CTN); STABILIZED LITHO-DENSITY
(SLD); AND ACOUSTIC
CALIPER (ACAL). PRIOR TO THE COMMENCEMENT OF
DRILLING FOR RUN 4, MAD PASS
DATA WERE ACQUIRED OVER PART OF THE RUN 3 INTERVAL
(BIT DEPTHS 11654'MD-
11965'MD), PRIMARILY FOR POROSITY DATA. RESISTIVITY
DATA OVER THIS
INTERVAL ARE INCLUDED AS A SEPARATE MAD PASS
PRESENTATION. RECORDED EWR4
DATA WERE LOST FROM 15117'MD TO TD. NEGATIVE PULSE
(REAL TIME) DATA ARE
PRESENTED FOR THIS INTERVAL.
6. MWD DATA ARE CONSIDERED PDC PER E-MAIL FROM D.
SCHNORR (GEOQUEST/BP)
TO R. OAKLEY (SSDS), DATED 9/27/01.
7.
MWD RUNS 1 - 4 REPRESENT WELL S-114 WITH API#:
50-029-23116-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 15603'MD I
6860'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SGRD = SMOOTHED NATURAL GAMMA RAY.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (RELATIVE TO
SEDP) .
TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE
MATRIX, ACAL-DERIVED
HOLE SIZE).
CTFA = SMOOTHED AVER~GE OF FAR DETECTOR'S COUNT RATE.
CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN) .
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN).
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR (LOW-
COUNT BIN).
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
SLDSLIDE = SLIDE INTERVAL ADJUSTED FOR THE SLD
SENSOR-TO-BIT DISTANCE.
AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA.
PARN~ETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: ACAL-DERIVED (9.875" BIT)
MUD WEIGHT: 9.4 - 10.1 PPG
')
)
MUD SALINITY: 300 - 550 PPM CHLORIDES
FORMATION WATER SALINITY: 22000 PPM CHLORIDES
FLUID DENSITY: 1.0 GICC
MATRIX DENSITY: 2.65 GICC
LITHOLOGY: SANDSTONE
$
File Header
Service name.............STSLIB.001
Service Sub Level Name...
Version Nurnber...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................LO
Previous File Name.......STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:.
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
RPD
FET
RPX
RPM
RPS
NCNT
FCNT
NPHI
DRHO
RHOB
PEF
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
59.0
116.5
6125.5
6125.5
6125.5
6125.5
6125.5
11552.0
11553.0
11553.5
11565.5
11565.5
11565.5
STOP DEPTH
15556.0
15603.0
15544.0
15544.0
15117 . 0
15117.0
15544.0
15499.5
15500.0
15497.5
15513.0
15513.0
15513.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVAIÆNT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED
PBU
M~!iJD
MWD
M\!iJD
MWD
$
DATA SOURCE
TOOL CODE
#
REMARKS:
BIT RUN NO
1
2
3
4
MERGED MAIN PASS.
$
MERGE TOP
59.0
2401.5
6154.5
12219.5
MERGE BASE
2401. 5
6154.5
12219.5
15603.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record......... ....Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
RPX ¡V¡WD OHMM 4 1 68 8 3
RPS MWD OHMM 4 1 68 12 4
RPH HWD OHMM 4 1 68 16 5
RPD MWD OHMM 4 1 68 20 6
)
)
FET MWD HOUR 4 1 68 24 7
NPHI MWD PU-S 4 1 68 28 8
FCNT MWD CNTS 4 1 68 32 9
NCNT MWD CNTS 4 1 68 36 10
RHOB MWD G/CM 4 1 68 40 11
DRHO MWD G/CM 4 1 68 44 12
PEF MWD BARN 4 1 68 48 13
GR MWD API 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 59 15603 7831 31089 59 15603
ROP MWD FT/H 0.13 1308.12 240.723 30943 116.5 15603
RPX MWD OHMM 0.78 2000 6.89317 17 984 6125.5 1511 7
RPS MWD OHMM 0.28 131. 63 5.79097 18838 6125.5 15544
RPM MWD OHMM 0.66 1030.92 6.17457 17984 6125.5 15117
RPD MWD OHMM 0.73 2000 8.21796 18838 6125.5 15544
FET MWD HOUR 0.08 57.4 1. 05586 18838 6125.5 15544
NPHI MWD PU-S 10.41 42.55 29.1496 7368 11553.5 15497.5
FCNT MWD CNTS 683.2 2380.2 995.734 7387 11553 15500
NCNT MWD CNTS 11 7963 175031 138974 7388 11552 15499.5
RHOB MWD G/CM 1.602 3.911 2.36935 7385 11565.5 15513
DRHO MWD G/CM -0.19 0.723 0.0645235 7385 11565.5 15513
PEF MWD BARN 0.91 7.46 2.99636 7385 11565.5 15513
GR MWD API 7.66 416.23 81. 4304 30995 59 15556
First Reading For Entire File..........59
Last Reading For Entire File...........15603
File Trailer
Service name.............STSLIB.001
Service Sub Level Name...
Version Number.... .......1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.002
Physical EOF
File Header
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation. ......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MAD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
RPM
RPD
RPS
RPX
FET
GR
R.Il.T
$
2
clipped curves; all MAD runs merged using earliest passes.
.5000
START DEPTH
11600.5
11600.5
11600.5
11600.5
11600.5
11608.0
11654.0
STOP DEPTH
11911.0
11911.0
11911.0
11911.0
11911.0
11918.0
11965.0
;J.
IT
MERGED DATA SOURCE
PBU TOOL CODE
MÞ.D RUN NO. MAD PASS NO. MERGE TOP
MERGE BASE
)
MWD
$
4
1
11600.5
11965.0
#
REMARKS:
MERGED MAD PASS.
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction................. Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MAD FT/H 4 1 68 4 2
GR MAD API 4 1 68 8 3
RPX MAD OHMM 4 1 68 12 4
RPS MAD OHMM 4 1 68 16 5
RPM MAD OHMM 4 1 68 20 6
RPD MAD OHMM 4 1 68 24 7
FET MAD HOUR 4 1 68 28 8
First Last
Name Service UrÜ t Min Max Mean Nsam Reading Reading
DEPT FT 11600.5 11965 11782.8 730 11600.5 11965
RAT MAD FT/H 8 765 173.648 623 11654 11965
GR MAD API 50.24 119.2 82.1364 621 11608 11918
RPX MAD OHMJvl 3.14 10.42 4.89113 622 11600.5 11911
RPS MAD OHMM 3.02 9.09 4.59172 622 11600.5 11911
RPM MAD OHMM 3.03 8.8 4.76093 622 11600.5 11911
RPD MAD OHMM 3.12 9.16 4.90801 622 11600.5 11911
FET MAD HOUR 26.209 31. 208 28.6612 622 11600.5 11911
First Reading For Entire File..........11600.5
Last Reading For Entire File...........11965
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................ LO
Next File Name..... ......STSLIB.003
Physical EOF
File Header
Service name... ..........STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.002
Comment Record
FILE HEADER
FILE NUNBER:
Rl\.W MI^1D
Curves and log
BIT RUN NUNBER:
DEPTH INCREMENT:
3
header data for each bit run in separate files.
1
.5000
)
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
START DEPTH
59.0
116.5
STOP DEPTH
2345.0
2401.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERA.TURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.. . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
05-SEP-02
Insite
7.75
Memory
2401. 0
115.0
2401. 0
.3
48.2
TOOL NUMBER
TLG012
13.500
115.0
Spud Mud
9.60
300.0
9.0
400
10.5
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP HWDOI0 FT /H 4 1 68 4'-'
GR MWDOIO API 4 1 68 8 3
Name Service Unit
Min
Max
Mean Nsam
.0
78.4
.0
.0
First
Reading
Last
Reading
)
)
DEPT FT
ROP MWDOIO FT/H
GR MWDOIO API
59
0.98
16.66
2401.5
728
126.96
1230.25 4686
152.514 4571
67.4714 4573
59
116.5
59
2401. 5
2401.5
2345
First Reading For Entire File..........59
Last Reading For Entire File...........2401.5
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number.... .......1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.OO4
Physical EOF
File Header
Service name.......... ...STSLIB.004
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ 1,0
Previous File Name.......STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
4
header data for each bit run in separate files.
2
.5000
START DEPTH
2345.5
2402.0
STOP DEPTH
6098.5
6154.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
08-SEP-02
Insite
7.75
Memory
6155.0
2401. 0
6155.0
48.4
74.5
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCG Natural gamma ray
$
TOOL NUMBER
TLG013
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13.500
115.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
Spud Mud
9.60
82.0
9.4
400
6.2
)
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERM PERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.000
.000
.000
.000
.0
99.5
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value.. """"" "" . .. .. . -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2345.5 6154.5 4250 7619 2345.5 6154.5
ROP MWD020 FT/H 0.22 1265.39 258.172 7506 2402 6154.5
GR MWD020 API 32. 7 5 152.03 88.0514 7507 2345.5 6098.5
First Reading For Entire Fìle..........2345.5
Last Reading For Entire File...........6154.5
File Trailer
Service name.............STSLIB.OO4
Service Sub Level Name...
Version Number...........1. 0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW M""wD
Curves and log
BIT RUN NUMBER:
5
header data for each bit run in separate files.
3
)
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
FET
RPM
RPS
RPX
ROP
$
.5000
START DEPTH
6099.0
6125.5
6125.5
6125.5
6125.5
6125.5
6155.0
STOP DEPTH
12172.5
12165.5
12165.5
12165.5
12165.5
12165.5
12219.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPMì:
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.............. . . . . . . . . .
Datum Specification Block sub-type...O
13-SEP-02
Insite
66.37
Memory
12219.0
6155.0
12219.0
69.4
74.9
TOOL NUMBER
142827
134760
9.875
6140.0
Water
9.50
45.0
9.4
300
6.4
Based
8.000
4.980
7.800
4.750
69.0
115.0
69.0
69.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
)
)
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM JvlWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 6099 12219.5 9159.25 12242 6099 12219.5
ROP MWD030 FT/H 0.43 1308.12 293.858 12099 6155 12219.5
GR MWD030 API 7.66 134.54 63.6114 12148 6099 12172.5
RPX JvlWD030 OHMM 0.78 2000 8.22706 12081 6125.5 12165.5
RPS MWD030 OHMM 0.28 131.63 6.73839 12081 6125.5 12165.5
RPM MWD030 OHMM 1.1 1031.38 7.15828 12081 6125.5 12165.5
RPD MWD030 OHMM 1.11 2000 10.1146 12081 6125.5 12165.5
FET MWD030 HOUR 0.08 57.4 0.863875 12081 6125.5 12165.5
First Reading For Entire Fi1e..........6099
Last Reading For Entire File...........12219.5
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........1. O. 0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.006
Physical EOF
File Header
Service name.............STSLIB.006
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.... ...03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
PEF
DRHO
RHOB
RPS
FET
RPM
RPX
RPD
GR
ROP
$
6
header data for each bit run in separate files.
4
.5000
START DEPTH
12118.0
12118.5
12121.5
12132.0
12132.0
12132.0
12166.0
12166.0
12166.0
12166.0
12166.0
12173.0
12220.0
#
LOG HElI.DER DATA
DATE LOGGED:
STOP DEPTH
15499.5
15500.0
15497.5
15513.0
15513.0
15513.0
15544.0
15544.0
15117.0
15117.0
15544.0
15556.0
15603.0
16-SEP-02
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT);
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM);
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
SLD
CTN
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROM.A.G. RESIS. 4
STABILIZED LITHO DEN
COMP THERMAL NEUTRON
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Insite
66.37
Memory
15603.0
12219.0
15603.0
25.4
74.2
TOOL NUMBER
142827
134760
067985
174114
9.875
6140.0
Water
10.10
41.0
8.8
300
6.0
Based
1. 080
.590
2.700
2.500
69.0
132.8
69.0
69.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FTIH 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX HWD040 OHMM 4 1 68 12
RPS MWD040 OHMM 4 1 68 16 5
RPH !v1WD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
NPHI MWD040 PU-S 4 1 68 32 9
FCNT rf\I'JD040 CNTS 4 1 68 36 10
NCNT MWD040 CNTS 4 1 68 40 11
RHOS MWD040 G/CM 4 1 68 44 12
DRHO MWD040 G/CM 4 1 68 48 13
PEF MWD040 BARN 4 1 68 52 14
)
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12118 15603 13860.5 6971 12118 15603
ROP MWD040 FT/H 0.13 979.83 185.949 6767 12220 15603
GR MWD040 API 40.02 416.23 115.507 6767 12173 15556
RPX MWD040 OHMM 0.79 18.94 4.15786 5903 12166 15117
RPS MWD040 OHMM 0.73 23.25 4.09501 6757 12166 15544
RPM MWD040 OHMM 0.66 17.95 4.159 5903 12166 1511 7
RPD MWD040 OHMM 0.73 23.07 4.36118 6757 12166 15544
FET MWD040 HOUR 0.11 03 28.08 1. 39911 6757 12166 15544
NPHI MWD040 PU-S 10.41 42.55 29.3806 6753 12121.5 15497.5
FCNT MWD040 CNTS 683.2 2380.2 993.172 6764 12118.5 15500
NCNT MliJD040 CNTS 11 7963 175031 138961 6764 12118 15499.5
RHOB fvn"JD040 G/CM 1.602 3.911 2.37107 6763 12132 15513
DRHO MWD040 G/CM -0.19 0.723 0.0657631 6763 12132 15513
PEF MWD040 BARN 1.81 7.46 3.01441 6763 12132 15513
First Reading For Entire File..........12118
Last Reading For Entire File...........15603
File Trailer
Service name.............STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.007
Physical EOF
File Header
Service name........ .....STSLIB.007
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MAD
Curves and log
DEPTH INCREMENT:
MAD RUN NUMBER:
MAD PASS NUMBER:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
RPM
RPS
FET
RPD
GR
RAT
$
7
header data for each pass of each run in separate files.
.5000
4
1
START DEPTH
11600.5
11600.5
11600.5
11600.5
11600.5
11608.0
11654.0
STOP DEPTH
11911.0
11911.0
11911.0
11911.0
11911.0
11918.0
11965.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
16-SEP-02
Insite
66.37
Memory
11965.0
11600.0
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUI'1 ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING D~rA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
I'1UD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
I'1ATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction... .... . . . . . . . . . . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.... . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
11965.0
25.4
74.2
TOOL NUMBER
142827
134760
9.875
6140.0
Water
10.10
41. 0
8.8
300
6.0
Based
1. 080
.590
2.700
2.500
69.0
132.8
69.0
69.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MAD041 FT/H 4 1 68 4 2
GR MAD041 API 4 1 68 8 3
RPX MAD041 OHMM 4 1 68 12 4
RPS MAD041 OHMM 4 1 68 16 5
RPM MAD041 OHl-1M 4 1 68 20 6
RPD MAD04l OHMM 4 1 68 24 7
FET MAD041 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11600.5 11965 11782.8 730 11600.5 11965
RAT MADO 41 FT/H 8 765 173.648 623 11654 11965
GR MAD041 API 50.24 119.2 82.1364 621 11608 11918
RPX MAD041 OHMM 3.14 10.42 4.89113 622 11600.5 11911
RPS MAD041 OHl-1M 3.02 9.09 4.59172 622 11600.5 11911
RPM MAD041 OHMH 3.03 8.8 4.76093 622 11600.5 11911
RPD MADO 41 OHMM 3.12 9.16 4.90801 622 11600.5 11911
FET MAD041 HOUR 26.209 31. 208 28.6612 622 11600.5 11911
.,
'.,
)
)
First Reading For Entire File..........11600.5
Last Reading For Entire File.......... .11965
File Trailer
Service name.............STSLIB.OO7
Service Sub Level Name...
Version Number. . . . . . . . . . .1. 0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.OO8
Physical EOF
Tape Trailer
Service name.............LISTPE
Date.....................03/03/19
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name................UNKNOWN
Continuation Number......Ol
Next Tape Name...........UNKNOWN
Comments.................STS LIS
Writing Library.
Scientific Technical Services
Reel Trailer
Service name.............LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03/ 03/1 9
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................UNKNOWN
Continuation Number......01
Next Reel Name........... UNKNOli'i1N
Comments. . . . . . . . . . . . . . . . . STS LIS
Writing Library- Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File