Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-100 ) ) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special res can activity or are viewable by direct inspection of the file. :;;A¡)J.. - L C2 0 Well History File Identifier ""'n Page Count from Scanned File: U r7- (Count does include cover sheet) Page Count ~atches Number in Scanning Preparation: V VEl . j ~ NO Heier;: Maria .J) Date: t.-f 17 D S Isl If NO in stage 1, page(s) discrepancies were found: YES NO Organizing (done) o Two-sided 1111111111111111111 RESCAN ~olor Items: D Greyscale Items: DIG?L DATA p{>iskettes, No. , ~ther, No/Type: C. 'D I o Poor Quality Originals: o Other: NOTES: BY: Helen (Maria ) Project Proofing BY: Hele~ Scanning Preparation BY: Helen ~ .~ c/o x 30 = Production Scanning Stage 1 BY: Stage 1 BY: Helen Maria Scanning is complete at this point unless rescanning is required. ReScanned BY: Helen Maria Comments about this file: ~scan Needed OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) o Logs of various kinds: o Other:: J /. 1/1 () Date: 4 1 ð~ Islr ~ I , Date: Lf t: () 0 151 t11~ . ., +1 = TGTA^tfoAGES {II (Count does not in IU. de. cover sheet) Date: if tJ. oS;- 151 . /J I . WID wtP Date: 151 I 111I1 III 1 II Date: 151 Quality Checked 1111111111111111111 y • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS90N WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 8/8/2010 ✓ 202 -100 10 -196 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 -6612 02/23/2003 50- 029 - 20089 -01 -00 4a. Location of Well (Governmental Section): 7. Date T. D. Reached: 14. Well Name and Number: Surface: 02/27/2003 PBU F -04A 2308' FSL, 2396' FWL, SEC. 02, T11 N, R13E, UM 8. KB (ft above MSL): 57.1' 15. Field / Pool(s): Top of Productive Horizon: 2986' FSL, 1140' FWL, SEC. 01, T11 N, R13E, UM GL (ft above MSL): 33.28' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 3746' FSL, 1128' FWL, SEC. 01, T11N, R13E, UM 9649' 8350' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x- 651960 y- 5973828 Zone- ASP4 11206' 9019' ADL 028280 TPI: x- 655969 y- 5974589 Zone- ASP4 11 • SSSV Depth (MD +TVD): 17. Land Use Permit: Total Depth: x- 655941 Y 5975348 Zone- ASP4 N/A 18. Directional Survey: ❑ Yes I@ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): Submit electronic and printed information per 20 AAC 25.050 N/A ft MSL 1900 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- DrilULateral Top Window MD/TVD: CCL, GR, Memory CNL, MWD 1 10010' 8644' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 0" Stove Pie Srf Surf ' 4" q9nn ny Ppirminf-g-4 133/8 "x9 -5 /8^ # / 47# K -55 / N -80 Surface 12' Surf 8075' 1 -1/4" 241 x Cla 1775 x PF II 9-5 /8" x 7" 47# / 29# N-80 Surface 10010' Surfa 86"' 12A/4"x8­112" 460 sx las ' -!" 111193'1 ' 24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET MD PACKER SET MD / TVD (MD +TVD of Top & Bottom; Perforation Size and Number): None 4-1/2",12.6#, 13Cr80 8607'/ 7494' 8508'/ 7412' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Gtr DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED AJOW NOV C' 4 201D 9649' Set Whipstock -9650' P &A with 13 bbls of 15.8 ppg Cement 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 24 -Hour Rate 4 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) A uir Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lith p s or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laborato results per 20 AAC 250.071. None Alaska toil 08s Cas. Ciart RBDMS OCT 0 5 ..Anchatage Form 10-407 Revised 1212009 CONTINUED ON REVERSE n Submit Original Only 29. GEOLOGIC MARKERS (List all formations and maMV encountered): 30. IPMATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Top CGL 10058' 8688' None Base CGL 10152' 8771' 25N 10207' 8821' 25P 10213' 8827' 22P 10290' 8898' 21N 10355' 8956' 21P 10364' 8963' Zone 1 B 10418' 9000' 14N 10426' 9004' 14P 10438' 9009' Formation at Total Depth (Name): 31. List of Attachments: Summary of Well work and Daily Drilling Reports, Well Schematic Diagram. 32. 1 hereby certify that the foregoi7g is true and correct to the best of my knowledge. J / Signed: Sondra S wman j ZQ,- , _Title: Drilling Technologist Dater 1 C , f PBU F-04A 202 -100 310 -196 Prepared By Name/Number. Sondra Stewman, 564 -4750 Well Number Permit No. / Approval No. Drilling Engineer: Cody Hinchman, 564 -4468 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only F -0413, Well History (Pre Rig Sidetrack) Date Summary 07/15/10 Tag TT @8582' SLM / 8607' MD, +25' Correction, SD on 2 -3/8" Lnr @ 9677 SLM / 9702' Corrected MD. 07/15/10 T /I /O = 2210/320/0/0 temp =S /I Load TBG for E -Line (CTD Prep) Pumped 5 bbls neat meth, 293 bbls 1% KCL & 38 bbls DSL down TBG to load & Freeze Protect. Pe & Pad -Op notified upon departure. FWP =0/880 /60/40 *Tags hung. SV, WV & SSV =S /I, MV =Open, IA & OA =OTG' 07/15/10 (E -Line: Set Whipstock) Initial T /I /O: 110/500/50 PSI Changed TOWS set depth to 9642.5' due to early tag of tubing stub at 9685'. TOWS located at 9642.5 BOWS located at 9660'. 2 PIP tags located at 9652.5', Whipstock face set at 180 deg. Final T /I /O: 100/450/0 PSI MASTER, SWAB, SSV - CLOSED 07/16/10 T /1 /0= 0/350/0, Temp =Sl, PPPOT -T (PASS), CTD screen External checks installed. Stung into test port (0+ psi), bled to 0 psi. Pumped through void, good returns. Pressured void to 5000 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. Functioned LDS (2.5 "), all moved freely. 07/19/10 CTU # 5 W / 1.75" ct. Job scope: Mill XN nipple and P &A. Drift coil with 1 -1/4" ball. Witness BOP weekly BOP test. 07/20/10 CTU # 5 W / 1.75" ct. Job scope: Mill XN nipple and P &A. Continue weekly BOP test. Good BOP test. RIH w/ BOT motor & 3.80" diamond stream mill & 3.80" diamond parabolic mill. Mill out XN nipple @ 8599' CTM. POH. RIH w/ 3" BD Nozzle, tag whipstock @ 9678' CTM. Online with 13 hhlc of JS R ppg ce ment , 9 ml fluid loss, 4 h 17 min thickening time Squeezed 3 bbls of cement behind pipe Hel squeeze pressure of 1300 psi for 30 mins cleaned out excess cement to top of whipstock with biozan. Chase cement to surface getting 1:1 returns. Freeze protect well w/60/40 Methanol 38 bbls. Shut well in with 550 psi on well. 07/22/10 TWO = 350/340/20/20. Temp= SI MIT T P to 1000 psi (Test Cement Integrity). Pumped 0.7 bbls of diesel to reach test pressure. Tbg. Lost 20 psi. in the first 15 min. and 0 psi in the 2nd 15 min. for a total loss of 20 psi in a 30 min test. Bled back 1 bbl to final WHP= 40/340/20/20. SV, WV, SSV= closed. MV IS OPEN, IA/OA/OOA = OTG. 07/24/10 Well S/I on arrival "'(Post CTD) Tagged top of cement @ 96.50' SLM w/ 3.50: cent, 2.50" S- Bailer (No Sample). Well S/1 on departure, notified PAD operator of well status 07/26/10 T /1 /0= 375/350/0 Pressure tested lubricator to LOW: 300 PSI /PASS HIGH: 3500 PSI /PASS. Set 4- 1/16" CIW "H" BPV #710 thru tree, 1 -2' ext. used tagged @ 102" PRE -CTD no problems. 07/27/10 T /I /O /00= 180/270NAC/0. Temp =Sl. Bleed WHP's to 0 (pre CTD). No AL. T FL @ surface. IA FL near surface. Bled TP to bleed trailer from 180 psi to 0 psi in 10 minutes (fluid). 30 minute monitor. TP 30 minute monitor. IAP increased 5 psi. Final WHP's= 5 /5NAC /0. SV, WV =C. SSV, MV =O. IA, OA =OTG. NOVP. 07/27/10 T /1 /0= 250/0/0 Torqued all tree flange 1 -1/4" studs (L7M non - coated) to API specs. 726 ft/lbs w /pump #43030 set @ 5250 psi (see log for bolt movement); Pressure tested lubricator to 300 psi low /pass 3500 psi high /pass; Pulled 4" CIW BPV #710 @ 102" w/ 1 -2' ext.; Pressure tested tree against TWC to 300 psi. low /pass -5000 psi high /pass; Pulled 4" CIW TWC #200 @ 102" w/ 1 -2' ext.; Upon completion pressure tested swab cap to 3500 psi; Pre Nordic 1. 08/05/10 T /1 /0= 60/0/0 Pressure tested SSV /master valve & lubricator to 500 psi low /pass -3500 psi high /pass; Set 4" CIW TWC #284 @ 102" w/ 1 -2' ext.; Upon completion pressure tested swab cap to 3500 psi; Pre Nordic 1. 08/06/10 T /I /O =SSV /220/0 + /0+ Temp =Sl. Bleed OA & OOA to 0 psi /hold open bleed on OA, OOA (Rig assist). No AL. No flowline or well house Bled OA & OOA to 0 psi in less than a min (all gas) held open bleed for Cameron while servicing tree. Final WHPs =SSV /220/0/0. Unable to verify SV, WV, MV position. SSV =C. IA, OA, OOA =OTG. NOVP. 08/06/10 (Well Head Repair) Replaced eight 2" studes on 20 3/4" casing spool to starting head. Torqued all L7 2" studs to 3070 fl lbs. MIT to pressure test void. Page 1 of 1 I - P+L`ASKA - �P brth America a1 �f Al eration Sumrhary:Report' E Common Well Name: F-04 AFE No Event Type: MOBILIZATION (MOB) Start Date: 8/6/2010 End Date: 8/20/2010 X3- OOVW8 -C (701,875.00 ) Project: Prudhoe Bay Site: PB F Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 2/1/1971 12:00:OOAM Rig Release: Rig Cont NO C ALISTA UWI: 500292008900 Active Datum: 4 : 04 2/2/1971 00:00 @57.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/612010 08:00 09:00 1.00 MOB P PRE MOVE RIG FROM BACKSIDE OF F PAD TO FRONT SIDE OF F PAD. SIMULTANEOUSLY, PREP GRAVEL IN FRONT OF WELL. 09:00 09:35 0.58 MOB P PRE WHILE GETTING PERMIT SIGNED, 8 STUDS NOT MEETING API SPEC ON 13 -5/8 "x18 -5/8" CASING FLANGE (OOAxOA) WERE NOTICED. WELL HOUSE FLOOR GRATING WAS OBSTRUCTING THE WELLHEAD INSPECTION PRE RIG. SET RIG DOWN. GREASE CHOKE MANIFOLD & REEL HOUSE HARDLINE VALVES, GREASE CHOKE °& KILL HCR. C/O GRIPPER BLOCKS ON INJECTOR. REPLACE PACKING IN MUD PUMP #1. SPOT OFFICE TRAILER. CLEAN UP AROUND F -47'. BRING SUPPORT EQUIPMENT FROM F -47 TO F -04. 09:35 09:45 0.17 MOB C PRE PJSM REGARDING WELLHEAD WORK WITH CAMERON WELL HEAD TECHS (4), DHD TECH (1). 09:45 11:00 1.25 MOB C PRE SPOT BLEED TRAILER NEXT TO WELLHEAD. PLACE CELLAR BOARDS FOR CASING FLANGE ACCESS. BLEED OFF OA & OOA FROM O+ +PSI. LEAVE OPEN BLEED ON OA & ODA, MONITOR SAME DURING JOB BY DHD TECH. WIRE BRUSH & PLACE KROIL OIL ON ALL CASING STUDS. WAI FOR PROPER WRENCH 11:00 13:10 2.17 MOB C PRE ONE AT A TIME, REPLACE 8 STUDS & ADJUST j THE R EST TO MEET API SPEC. 13:10 14:30 1.33 MOB P PRE SET DOWN T -MATS AROUND TREE. SPOT RIG i OVER WELL. PULL TREE CAP. ACCEPT RIG AT 14:30 16:30 2.00 MOB P PRE I NU BOPE. RU,A & OA TRANSDUCERS & CRASH FRAMES. SPOT CUTTINGS BOX. RESPOT OFFICE TRAILER. 16:30 16:50 0.33 MOB P PRE PJSM REGARDING SWAPPING OUT REELS. 16:50 18:00 1.17 MOB P PRE SWAP OUT 2 -3/8" CT FOR 2" CT. 18:00 23:00 5.00 BOPSUR P PRE START BOP TEST, RIGGING UP INNER REEL IRON p AND BULKHEAD JUNCTION BOX. BOP TEST WITNESS WAIVED BY BOB NOBLE (AOGCC INSPEC 23:00 00:00 1.00 BOPSUR N RREP PRE PUMP OUT STACK AND REPAIR UPPER PIPE RAM DOOR SEAL. 8/7/2010 00:00 05:00 5.00 BOPSUR P PRE CONTINUE TESTING BOPE. 7- 1/16 "x4 - 1/16" FLANGE IS LEAKING. Printed 8/9/2010 8:50:40AM Adftk tcrrkt America - Al -AKA - BP _a Qt 2 4peratiic�n Suml»r�% Report Common Well Name: F -04 DIMS AFE No Event Type: MOBILIZATION (MOB) Start Date: 8/6/2010 End Date: 8/20/2010 X3- OOVW8 -C (701,875.00) Project: Prudhoe Bay Site: PB F Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 2/1/1971 12:00:OOAM Rig Release: Rig C ontractor: NORDIC CALISTA UWI: 500292008900 Active Datum: 4: 04 2/2/1971 00:00 @57.1ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 05:00 - 09:00 4.00 BOPSUR N RREP PRE SUCK DOWN BOP STACK, REMOVE CHINA HAT. REMOVE HOT TUB. RU BOP SLINGS TO BLOCKS & ATTACH TO BOP'S. BREAK 7- 1/16 "x4 - 1/16" FLANGE BOLTS. LIFT STACK & REPLACE RING GASKET. SET BOP'S DOWN. INSTALL & TIGHTEN i FLANGE BOLTS. REMOVE LIFT SLINGS. INSTALL CHINA HAT & HOT TUB. FILL STACK WITH WATER. SHELL TEST BOP STACK. 09:00 - 13:00 4.00 BOPSUR P PRE CONTINUE TO TEST BOPE PER AOGCC REGS 250PSI /350OPSI - PASS. 13:00 13:25 0.42 BOPSUR P PRE PJSM REGARDING PULLING TWC. 13:25 13:50 0.42 1 BOPSUR P PRE HOIST DSM EQUIPMENT TO RF. MU DSM LUBRICATOR. STAB ONTO WELL. 13:50 14:20 0.50 BOPSUR P PRE PRESSURE TEST DSM LUBRICATOR 250PSI /3500PSI'' PASS 14:20 14:25 0.08 BOPSUR P PRE PULL TWC. RECOVERED 4" H TWC. 14:25 14:40 0.25 BOPSUR P PRE RD DSM LUBRICATOR. 14:40 14:55 0.25 BOPSUR P PRE PJSM TO PU INJECTOR AND PUMP SLACK. 14:55 18:15 3.33 BOPSUR P PRE PU INJECTOR i 18:15 18:45 0.50 BOPSUR P PRE BOOT ELINE 18:45 19:30 0.75 BOPSUR P PRE FILL COIL WITH FRESH WATER. 19:30 20:00 0.50 BOPSUR P PRE LOTO REEL. CLOSE INNER REEL VALVE. PRESSURE TEST SURFACE LINE. 50OPSI LOW / 4000PSI HIGH _ 20:00 20:15 0.25 BOPSUR P PRE PJSM TO CUT COIL. PUMP SLACK INTO REEL AT 2.8BPM. 20:15 21:00 0.75 BOPSUR P PRE CUT 300' COIL. 21:00 21:30 0.50 BOPSUR P PRE MU BOT CTC AND PULL TEST TO 30K. 21:30 21:50 0.33 BOPSUR P PRE MU STINGER AND SWIZZLE STICK, STAB ON (} WELL AND PUMP SLACK FO RWARD. _ 21:50 22:50 1.00 BOPSUR P PRE TOOK 7 BBLS TO FILL WELL. POP OFF WELL HEAD AND WATCH FOR FLOW. TEST ELINE FOR — CONTINUITY- TEST GOOD. REHEAD BHI. NO j FLOW. — 22:50 23:20 0.50 BOPSUR P PRE MU PLATE AND TEST UQC TO 4000PSI. 23:20 23:50 0.50 BOPSUR P PRE MU WINDOW MILLING BHA - WINDOW MI STRING MILL, EXTREME MOTOR, CENTRALIZER, j 2 JTS PH6, BLIND SUB, DGS, DIPS, EDC, PC, WEAR SUB, LQC, UQC AND CTC. 23:50 00:00 - 0.17 BOPSUR P PRE STAB INJECTOR ON WELL AND PUMP SLACK FORWARD AT 2.34BPM. Printed 8/9/2010 8:50:40AM .Arrlerwa ALASKA: SP page_ poration Sum��ry:Repart Common Well Name: F -04 DIMS AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 8/7/2010 End Date: 8/14/2010 X3- OOVW8 -C (1,270,700.00 ) I Project: Prudhoe Bay Site: PB F Pad Rig Name /No.: NORDIC 1 Spud Date/Time: 2/1/1971 12:00:OOAM Rig Release: Rig Co ntr ac t o r: N O R D I C CALISTA UWI: 500292008900 Active Datum: 4 : 04 2/2/1971 00:00 @57.1ft (above Mean Sea Level) Date From - To j Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (ft) 8/8/2010 00:00 02:00 2.00 STMILL P WEXIT RIH WITH WINDOW MILLING BHA #1 02:00 04:00 2.00 STMILL P WEXIT LOGGING A TIE IN PASS FROM 8500' DOWN TO 8700' AT 1.5FPM. CORRECTION -25' 04:00 05:45 1.75 STMILL P WEXIT TAG WHIPSTOCK AT 9,649' AND DISPLACE WELLBORE TO 10.3PPG SODIUM BROMIDE MUD X7. 05:45 18:00 12.25 STMILL P WEXIT TIME MILL WINDOW FROM 9648.9FT USING 10.2PPG FLO -PRO AT 2.11 BPM13675 FS, �•� - {� 100- 20OPSI MW, 1 FT /HR ROP, 2.0 -2.5K WOB, 11 PPG ECD, PVT 346. BLEED OFF IA FROM 55OPSI TO 9OPSI IN 5 MIN TO TIGER TANK. BLEED OFF OA TWICE FROM 20OPSI TO OPSI IN 2 MIN TO SLOP TRAILER, ODA TRACKED SAME. BEGIN �� MIXING ASPHASOL & RESINEX INTO MUD SYSTEM. 30OPSI INCREASE AFTER MIXING WAS COMPLETE. r+_ off./ 18:00 21:20 3.33 STMILL P WEXIT CONTINUE MILLING WINDOW AT 9655.4' r 2.11 BPM, 2.0 -3.OK WOB, PVT =348 LOOKS LIKE THE CENTRALIZER ABOVE THE MOTOR IS HANGING UP ON THE TOP OF THE WHIPSTOCK, TRYING MORE WEIGHT TO GET �i OVER THE HANG UP. M ILLED OFF NICE. 21:20 23:10 1.83 STMILL P WEXIT CONTINUE MILLING WINDOW AT 9656.1' 2.11 BPM, 1.3 -1.5K WOB, PVT 347 MILLING OFF AND TAKING ANOTHER BITE _ _ EVERY 9 MINUTES. 23:10 00:00 0.83 STMILL P WEXIT DRILL RAT HOLE FROM 9,656.8'to 9,663'. 8/9/2010 00:00 01:20 1.33 STMILL - P WEXIT FINISHED MILLING WINDOW AND 10' OF KINGAK. MU SAMPLE SHOWS SHALE. 01:20 01:30 0.17 STMILL P WEXIT BACK REAM UP AND DOWN THREE TIMES AT 1FPM. 01:30 02:05 STMILL P WEXIT DRY DRIFT THROUGH WINDOW CLEAN. POOH. 02:05 02:30 0.42 STMILL P WEXIT LOG UP FROM TUBING TAIL TO FIRST GLM. MINUS 18' CORRECTION TO TUBING SUMMARY DATED 9/12/2008. 1 02:30 04:00 1.50 STMILL P WEXIT POOH 04:00 04:30 0.50 STMILL P WEXIT LID MILLING BHA #1. MILLS WERE 3.79" NO -GO. 04:30 05:00 0.50 DRILL P INT1 PJSM TO MU BHA #2. FLOW CHECK WELL- NO FLOW. 05:00 05:30 0.50 DRILL P INT1 MU BHA #2 (3" BICENTER BIT, X -TREME MOTOR, HOT, DGS, DPS, EDC, POWERCOMMS, SUB WEAR PROTECTION, LQC, UQC, CTC). 05:30 07:10 1.67 DRILL P INT1 STAB INJECTOR AND RIH. CIRC MIN RATE THROUGH THE BIT 0.24BPM /1040PSI. 07:10 07:50 0.67 DRILL P INT1 LOG DOWN FOR TIE -IN FROM 850OFT. PLUS 24.5FT CORRECTION. _ 07:50 08:20 0.50 DRIL�P INT1 CONTINUE TO RIH, PUMP MIN RATE THROUGH BIT AT 0.25BPM /102OPSI. Printed 8/9/2010 8:51:13AM TREE Cw WELLHEAD McEVOY E5 WELL ANGLE> 70 @ 104117' E ACTUATOR BAKER C Rom TUBING- * KB. ELEV = 57.1' PJC DRAR F-04B ��4 "E 1 H T BF. ELEV = 39.1 T KOP 3000 Max Angle 96 @ 10812 30" CONDUCTOR 95' Datum MD = 10193' 13-3/8" PATCH ROSS CSG PA�� Datum TV D 8800` SS 193 113-3/9' CSG, 72#, N-80 BTRS, ID = 12-347" :j N 2 000' 19-5/8" CSG, 47#, NT-80S, NSCC, ID 8.681 2000' 2022' -1 13-318" X 9-518" XO, ID = 8.681 118-5/8" CSG, 96.5#, K55 BTRS, ID = 17.656' 2004' 113-316' CSG, 68#, K-55, ID = 12A15" 2022' 2088' 1 4-1/2" TBG, 12.6#, 13CR-90 VA M ACE XO 2068' GAS LIFT MA NDRELS 13CR-90 VA M TOP F�l MD TV D DEV TYPE I VLV I LATCH I PORT I DATE 3 3387 23 KBG-2 DOME BK 16 08128/10 2 6631 5919 39 KBG-2 SO BK 20 08/28/10 @ 1 8418 7338 35 KBG-21 DMYY ISBK-21 0 109112108 Minimum ID = 1.780" 8573' - ­ S ­ 1 2.70" BTT DEPLOYMENT SLEEVE 12 - HE X ID= 3.$1 3 X 4-112" BKR S-3 PKR, ID = 1870'• -fZ1 /2 - HES X NIP, ID = 3.813 ��370 PJD=2 8531' 8534 ; �1/2 8539' 8573' 210" BTT DEPLOY SLV, ID = 1.78#1" 8594! 1 4-112`T13G, 12.6#, 13CR-80 VA M TOP, -0152 bpf, ID = 3.958 586or 7"TBG,26#,L-8OU4S,.0383bpf,ID=6.276'- 8642' - F7 -- PBR OF), —ID BEHND 8656' 9-518'X 7" LTP, ID = ?? CT LNR 8664! I-J9-5/8 X 7 SEAL XSSY: ID = ?? 19-5/8" CSG, 47#, N-80 SIL, ID = 8.681" 9312` 8775' -1 9-518" x r TrvV LTP w /LNR H6R, ID ==-? - 7" MILLOUT WINDOW (F-0413) 9647 9655 14-1/2" X 7" BKR WHIPSTOCK (07/15110) 9642' F7 LNR, 29#,N-80S/L,.0371bpf,]D=6.184' ESTIMATED TOC SCMT (08/18/OE) J-J9762'� 10726' 2 - 318" MA RKER JOINT PERFORATION SUMMARY REF LOG: SWSMEMCNL/GRON08120/10 ANGLE AT TOP PERF: 94* @ 10680' Note: Refer to Production DB for historical perf data 116 - 4P -- 13T51 SIZE SPF INTERVAL Opn/Sqz DA TE 1.56" 6 10680 -11010 0 08/20110 1 .56 6 11060 -11200 0 08/20/10 1.56 6 11460 -11660 0 08/20110 E-316' LNR, 4.70#, L-80 STL, 0039 bpf,.ID = 1 .992" 1 11679' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06126176 ORIGINAL COM 0 PLETION 08/30/10 JLJ1AGR GLV 0 (013/28/10) WELL F-04B 67110187 NlES RIND 08131110 PJC DRLG DRAFT CORRECTIONS PERMIT No: X100870 03103/03 NORDIC 2 CTD SIDETRACK (F-04A) A R No: 50-029-20089-02 09/14108 N4ES RWO 3XI SEC 2, T1 N, R1 3E, 2308'FSL & 2396 FWL NORDIC I CT11 108122/10 1 SIDETRACK (1744B) SP Exploration (Alaska) 1081241101 PJC 1DRLG DRAFT CORRECTIONS 1 • • ~l~Qu s 0~ l~~Q~~3Q /.E,.Po,.E..~o~a~. John McMullen Engineering Team Leader ~ .,,~ ,~~ ~ << ,; t~ BP Exploration (Alaska), Inc.~Y ~'~' ~~` '~ ~ ~` ~~,``~ ~~ ~Ov P.O. Box 196612 ~~ Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-04A Sundry Number: 310-196 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ,,~ Chair DATED this ~ day of July, 2010. Encl. STATE OF ALASKA ~~~~ ALASK~L AND GAS CONSERVATION COMMIS~I APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 -,~%~' 6 -~?~/a 1. Type of Request: ^ Abandon . ®Plug for Redrill ^ Perforate New Pool ^ Repair Well ^ Change Approved Program ^ Suspend ^ Plug Perforations ^ Perforate ^ Pull Tubing ^ Time Extension ^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate ^ Alter Casing ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. _ ®Development ^ Exploratory 202-100 ' 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20089-01-00' 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PI3U F-04A - Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. Field /Pool(s): ADL 028280 ~ Prudhoe Bay Field / Prudhoe Bay Oil Pool 1 L PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11206' - 9019' ~ 11157 ~ 901 T ~ None None Casin Len th Size MD TVD Burst Colla se Structural Conductor g ' ' Surface 2004' 18-5/8" 2004' 2004' 930 70 Intermediate 9312' 13-3/8" x 9-5/8" 9312' 8075' 3450 1950 Production 1 1 7" 1 1 44' 6870 47 Liner Liner 2710' 2-3/8" ' - 11193' 8392' - 901 11200 1178 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10540' - 11020' 9029' - 9014' 4-1/2", 12.6# 13Cr80 8607' Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV 8508' / 7412' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ' ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: July 6, 2010 ^ Oil ^ WINJ ^ WDSPL Plugged 16. Verbal Approval: Date: ^ Gas ^ GINJ ^ GSTOR ^ Abandoned r ~ Suspended ^ WAG ^ SPLUG Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ron Philli s, 564-5913 Printed Name John ul en Title Engineering Team Leader Prepared By Name/Number: Signature ~.~~ Phone 564-4711 Dater ~~ ' ~ ~ Terrie Hubble, 564-4628 Commission Use Onl Conditions of approval: N tify Commission so that a representative may witness ~~ ~ ~a Sundry Number: ^ Plug Integrity BOP Test ^ Mechanical Integrity Test ^ Location Clearance , s` ~ 3 500 Qo~' st- ~ . Other: y~ Z Sao rssc. ~hK~ C S ~ C ~'~".~n'` ~ R~CE~~V~D Subsequent Form Required: < O_ L~/d Alaska Ail ~ r~ ~~~• Commission ~nGh~r~p APPROVED BY Approved By: COMMISSIONER THE COMMISSION Date Form 10-403 RecJtib1/aL+,~ ,~~ O n ~;;j~~i ~ ~_ 7 /~ Submit In Duplicate C~ J CJ by To: Alaska Oil & Gas Conservation Commission From: Ron Phillips CTD Engineer Date: June 22, 2010 Re: F-04A Sundry Approval Sundry approval for well F-04A is requested to squeeze cement past whipstock into perforations. The original 1971 vintage F-04 reached GOR in 2001. The 2003 CTD Sidetrack F-04A was shut in for integrity in 2006. In 2008 a RWO was performed to cut and pull the production liner and change out the tubing. REASON FOR SIDETRACK Sidetrack to gain access the Ivishak Zn 1 reservoir to the west in an unswept portion of the reservoir. The proposed plan for F-04A is to drill a through tubing sidetrack with the Nordic 1 Coiled Tubing Drilling rig on or around September 01.2010. The existing perforations will be isolated by the pre-rig cement squeeze past the whipstock. The sidetrack, F-04B, will exit the 7" liner drill a 4.25" hole through the Kingak, run a 3-3/16" liner across Kingak_and drill a 3" hole to the target in the Ivishak Zone 1 A/1 B. The following describes work planned and is submitted as an attachment to Form 10- 403. Aschematic diagram of the proposed sidetrack is attached for reference. Ct7,~~r (~~~ /l'rDGlvtt>~~, vr.a5 f~~~~~ ~~~1-~~~, Pre-Rig Work. (scheduled to begin July 6, 2010) ~? r 1. Dummy GLV's. 1 ,~' rc~ r ~~ ~,~ Sti~~ ;'n , /~ 2 ~~uf i~~ti5-~ r 2. MIT-IA, -OA. ~~, rct' c~~J no uvJ nPN. wYll~U~-~ >lr~Y/q 3. Run dummy whipstock drift to top of jet cut 2-3/8" liner C~ 9,700'. ~:~r~~~.p Fr~~~~-~.bs, ~~~ ~Pcv~p~y ~~~,~ a. 2-3/8" liner pulled Sept 11, 2008 " " ; ti-s FU~~'-~~ ~-~ ' >~~ ~'' 4. Set Baker 4-1/2 x 7 through tubi ng WS, set LS(+/-30 degs) orientation C~ 9,680 . ' " ~~~ ~`/~a ~ ~ 5. • Mill XN nipple at 8,594 to 3.80 . 6. Squeeze 13 bbls of 15.8 ppg cement past WS at 9 680'.' 7. , Pressure test Tubing to 1,000 psi for 10 minutes. 8. Test: PPPOT-T. Torqued LDS. 9. PT MV, SV, WV. 10. Blind and bleed lines, remove well house, level pad. `~~ Rig Work: (scheduled to begin on September 01, 2010) 1. MIRU and test BOPE to 250 psi low and 3500 psi high. ~. nnui ~.ts., wmaow at y,~~u~ ana i u~ of ratnoie. 3. Drill Intermediate: 4.125" OH, 90' (12 deg/100 planned) 4. Run 3-3/16" uncemented solid liner to cover up the Kingak, cross over from 3-3/16" to 3-1/2" just ~-t-~ inside window, leaving TOL at 8,550'. 5. Drill Lateral: 3" OH, 1,770' (15 &12 deg/100 planned). 6. Run 2-3/8" solid liner leaving TOL at 8,510'. 7. Pump primary cement leaving TOC at 10,000', 8.3 bbls of 15.8 ppg liner cmt planned 8. Cleanout liner to PBTD. 9. MCNL/GR/CCL log. 10. Perforate liner per asset instructions (600'). 11. Set Liner Top Packer at 8,510'. 12. Freeze protect well, RDMO •~ ~ • Post Rig: 1. Re-install well house and attach production lines. 2. Pull BPV 3. Run GLV's 4. Test separator? (600' of perfs) Ron Phillips CTD Engineer 564-5913 CC: Well File Sondra Stewman/Terrie Hubble „~ TREE z CTe'! WEi'LHFAD= AAcEI/OY ACTUATOR = BAKER C KB. ELEV = 57.1' 39:~ KOP = 3000' IUFax Angle = 96° ~ 10812' Datum MD = 10246' Datum TV D = 8860' SS 30" C(SFDl.1GTOR 13-3/8° CSG, 72~, F~F80 H~TRS, D = 12.347" H 1934' 9-5/8° t:SG; 47#, FISCC; D = 8.681' 2000' 18-518" CSG, 36.5#, K55 BTRS, D =17.655" 2004' 13-318" C^sG, 68#, K-55. D = 12.415" 2022' 41/2" TBG, 12.611, 13CR-80 VAM ACEXO 206$' 13CR-80 VAMTOP Minimum !D =1.995" @ 9700' TOP OF 2-3~" LINER F-04A 111" FES X NP, D = 3.8'13' T X 4111' BKR S-3 RCR, D = D = 3.870' 4-1/2" TBG, 12.6#, 13Ci~80 VAMTOP, .0'152 hpf, D = 3.358 7" TBG, 26#, L-80, .0383 Dpf', D = 6.276" ES. "'41!2' C-#tO1~lETL181WG""' 1934' 133!8' BAASCN ROSS f~G PATCM 2000' 9.5f8• x T x0, D = 6.276• 20'12" 133!8' x. 9.518' XO, D = 8.681' 208$' 411?" }ES ~( t~ D = 3.813' GAS LFT IYIANDfiaS ST ND ND DEV TYF~ VLV LAT F+OKT DATE 3 3410 3387 23 KGB-2 DONE BE]C 18 09!24108 2 6&31 3919 39 KGB-? SO SB1C 20 09124108 1 8418 7338 35 KGB-2 DMY BK- 0 09/12!08 8531' H41/2"kESXNP,D=3.813' $594' 41 CI' tfS XN t~ D = 3.725' $607' 41.12" YJLEG, D= 3.,958' $642' T PBR {40~, D= ~$2' T BOT Lt~t TOP PKR, D = ? $77$' H~-5/8' ~(T TNY LTPw /LNR HGR, D = ? ~9-518" CSG, 47#, 1x80 Sll, D= 8.681' TOP OF 2-318' LNR ( JET CDT (08128108) PEFiFf~tATK)N SUk1rW RY REF LOG: SVVS NEArI (~ ON 03/01!03 ANGLEAT TOPFfRF' 90° @ 10540' Ncite: Refer to Ftoduction DB far hisiarical De-f data SIZE SPF IMERVAL Opn/Sgz DATE 1-112" 4 10540 - 10610 O 03102/03 1-112" 4 t 0700 - 10850 O 03102103 1-112° 4 10330 - 11020 O 03/02103 T LNR 231#, Nr80 S/l, .0371 hpf, D = 6-184' 9762° ES?MATIDTOPOF CHrH1T SCNJT (08118!06} 99()9' TMARKERJT NiLOU7 YV~DOYV {F-04A) X0014' - '10016' I 1115T I Ltd 4.6~, L-80 STL, -0039 Dpf, D = 1.995' DATE REV BY C?OMuBfTS OIATE REV BY t:OR4~3JCS 06126!76 ORIGINAL COM PLETIOW 12115108 }iWl P.1C DRL6 L)IFtAFT TIONS 07M0187 Nt ES RYYO 03103/03 NORDIC 2 CTD SIDETRACK (F-04A) 09tf4108 WOES RYMO 09/24108 JL,YTLH GLV C10 11/18/08 HWI.lND DRLG [?RAFT GQE~EGT10M5 PRUDFiOE BAY 1.11\YT YVELL: F-04A iT N~: 2021000 APf No: 50-029-2008801 SEC 2, T1 t h1, R13E, 2308` FSL 82336' FVYL BP EYploratwn (Alaska) TREE = CNV ELLHEAD= McEVOY ACTt1ATOR = BAKER C KB. ElEV = 57.1' BF. ELEV = 39.17' KOP = 3000' Max Angle = 96° @ 10812' Datum MD = 10246' Datum TV D = 8800' SS 30" CONDUCTOR ~O~ ~ SAFETYI~SS: "*4-112" CHROMETUBING'*' Proposed CTD Sidetrack 13-3/8" CSG, 72#, N-80 BTRS, ID = 12.347" I-~ 3 y-,34' 9-5/8" CSG, 47#, NSCC, ID = 8.681" 2000 18-5/8" CSG, 96.5#, K55 BTRS, ID = 17.655" 2004' 13-3/8" CSG, 68#, K-55, ID = 12.415" 2022' 4-1/2" TBG, 12.6#, 13CR-80 VAM ACEXO 2068' 13CR-80 VAM TOP Minimum ID =1.995" @ 9700' TOP OF 2-3/8" LINER 4-1/2" HES X NIP, ID = 3.813" 8508' I~ 7" X 4-1 /2" BKR S-3 PKR, ID = ID = 3.870" 4-1/2" BKR KB LTP, ID = 1.375" ' 8500 TOL 2-3/8" 8510 TOL 3-3/16" 8550 8531 4-1/2" HES X NIP, ID = 3.813" d t = 3 80" ID ill 1/2" HES XN NIP ' 4 4-112" TBG, 12.6#, 13CR-80 VAM TOP, 8607 . m e o , 8594 - 8fi07' 4-1/2" WLEG 958" ID = 3 .0152 bpf, ID = 3.958 . , 40' ID = ? 42' 7" PBR f ID = 6 276" $680' 0383 b 7" 26# L 80 G ( ), 86 , . p , - , . TB , $6$2' 7" BOT LNR TOP PKR, ID = ? 8775' 9-5/8" X 7" TNV LTP w /LNR HGR, ID = ? 9-5/8" CSG, 47#, N-80 S/L, ID = 8.681" I~ 9312' a-1/z" x 7"whipstock ~ 96$0' TOP OF 2-3/8" LNR / JET Cllr (08/28/08) 9700' PERFORATION SUMMARY REF LOG: SWS MEM CNL ON 03/01!03 ANGLE AT TOP PERF: 90° @ 10540' Note: Refer to Roduction DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 1-1/2" 4 10540 - 10610 O 03/02/03 1-1/2" 4 10700-10850 O 03/02/03 1-1/2" 4 10930-11020 O 03/02/03 7" LNR, 29#, N-80 S/L, .0371 bpf, ID = 6.184" 5$z ~~~,a/ L~,..~/' `~ ~ 13-3/8" BAASCH ROSS CSG PATCH ~ 2000' --~ 9-5/8" X 7" XO, ID = 6.276" 2022' 13-3/8" X 9-5/8" XO, ID = 8.681" 20$$' 4-1/2" HES X NIP, -D = 3.813" GAS LIFT MANDRELS ST MD TV D DEV TYPE V LV LATCH PORT DATE 3 3410 3387 23 KGB-2 DOME BEK 16 09/24/08 2 6631 5919 39 KGB-2 SO SBK-2 20 09/24/08 1 8418 7338 35 KGB-2 DMY SBK-2 0 09/12/08 3-1/2" XO to 3-3/16" ~ 9650' 3-3/16" LNR, 6.2#, L-80 TGII, ID = 2.786" 9770' 10000' PLANNED TOC 2-3/8" LINER 3" HOLE 2-3/8" LNR, 4.6#, L-80 STL, .0039 bpf, ID = 1.995" I-I 11560' 9762 ~-~ ESTIMATED TOP OF CETAENT SCMT (08/1 t TSGR 9 ' MILLOUT WINDOW (F-04A) 10010' - 10016' 2-3/8" LNR, 4.6#, L-80 STL, .0039 bpf, ID = 1.995" DATE REV BY COMMENTS DATE REV BY COMMENTS 06/26/78 ORIGINAL COMPLETION 12/15/08 HW/ PJC DRLG DRAFT CORRECTIONS 07/10/87 N1 ES RWO 03/18/10 MSE PROPOSED CTD SIDETRACK 03/03103 NORDIC 2 CTD SIDETRACK (F-04A) 09114/08 N4ES RWO 09/24/08 JLJ/TLH GLV GO 11/18/08 HW/JMD DRLG DRAFT CORRECTIONS PRUDHOE BAY UNIT WELL: F-04B PERMff No: API No: 50-029-20089-02 SEC 2, T11 N, R13E, 2308' FSL ii< 2396' FWL BP Exploration (Alaska) ~~~ STATE OF ALASKA /o:~~~ OIL AND GAS CONSERVATION COMMI~N REPORT OF SUNDRY WELL OPERATIONS ~:~ (~~ i ~ ~ L008 1. Operations Performed: ~id5~i8 ~ii +~x ~8 9 COflB, ~O ^ Abandon ®Repair Well - ^ Plug Perforations ^ Stimulate ^ Re-Enter S~~~3 d1(ILell y~ ^ Alter Casing ®Pull Tubing _ ^ Perforate New Pool ^ Waiver ^ Other ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. -® Development ^ Exploratory 202-100 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20089-01-00 - 7. KB Elevation (ft): 571, - 9. Well Name and Number: PBU F-04A ' 8. Property Designation: 10. Field /Pool(s): ,4d 0028280. Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 11206' - feet true vertical 9019' , feet Plugs (measured) None Effective depth: measured 11157'- feet Junk (measured) None true vertical 9017'- feet Casing Length Size MD TVD Burst Collapse Structural Conductor 96' 30" 96' 96' Surface 2004' 18-5/8" 2004' 2004' 930 870 Intermediate 9312' 13-3/8" x 9-5/8" 9312' 8075' 3450 1950 Production 10010' 7" 10010' 8644' 6870 4760 Liner Liner 2710' 2-3/8" 8392' - 9018' -9700' - 11193 ' 11200 11780 I'' ll X ° {~(R Perforation Depth MD {ft): 10540' -11020' Perforation Depth TVD (ft): 9029' - 9014' 4-1/2", 12.6# 13Cr80 8607' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 7" x 4-1/2" Baker'S-3' packer 8508' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut 2-3/8" liner at 9700'. Cut tubing at 8370'. Pulled tubing and liner. Clean out and then run new Completion. 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 505 15,450 179 750 250 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: - ^ Explorato ®Develo ment ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: Contact Howard West, 564-5471 nyA Printed Name T rie Hubble Title Drillin T®chnolo ist l p Prepares ay NameMumber Si nature Phone 564-4628 Date ~ Terrie Hubble 564-4628 Form 10-404 Revised 04/2006 _ ~~~~, Submit Original Only nmissiorl ~-`~~, s Digital Well File Well: F-04 Well History • • Well Date Summary F-04A 8/26/2008 *** WELL SI ON ARRIVAL'** (pre rwo) RIH W/ 2.80" CENT & 2.50" LIB TO TAG WRP *** JOB IN PROGRESS/ CONT ON 08-27-08 WSR F-04A 8/26/2008 T/I/O/00=50/100/60/140 Temp =SI CMIT Tx IA PASSED to 3500 osi (Pre RWO) Pumped 22 bbls crude down IA to reach test pressure. On 3rd test, Tbg gained 20 psi, IA lost 0 psi in 1st 15 mins and T/IA lost 0/0 psi in 2nd 15 mins. Bled TBG/IAP. FWHP's=150/140/60/100 ***Tags hung and wellhead valves checked for position upon departure*** F-04A 8/26/2008 T/I/O/00 = 160/160/70/80. Temp = SI. T & IA FL (pre rig). No AL. T FL near surface, IA FL C~? 228' (13 bbl). SV, WV shut. SSV, MV open. IA, OA, OOA otg. NOVP. F-04A 8/27/2008 ***WELL SHUT-IN ON ARRIVAL*** INITIAL T/I/O/00= 200/100/100/100 RIGGING UP E-LINE UNIT IN PROGRESS FOR JET CUT. HAD GREASE CREW SERVICE SWAB VALVE. ***CONTINUE ON 8/28/08 WSR*** F-04A 8/27/2008 *** CONT FROM 08-26-08 WSR *** (pre rwo) DRIFTED W/ 2.80 CENT & 2.5 LIB TO 8010' SLM (IMPRESSION OF WRP) RAN WRP EO SLEEVE W/ TATTLE TAIL PINS TO 8010' SLM (PIN SHEARED) PULLED 3 1/2" WRP FROM 8010' SLM (SLIPS & ELEMENTS INTACT.I DRIFTED W/ 1.75 CENT & S-BAILER PAST TARGET DEPTH FOR TBG CUT C~ 9700' -STOPPED C~ 9800' SLM *** WELL LEFT SI, DSO NOTIFIED OF WELL STATUS *** F-04A 8/28/2008 T/I/0=170/80/40/100 Assist E-Line, CMIT TxIA PASSED to 1000 osi. (Pre RWO) Pumped 4.9 bbls crude down IA &Tbg to pressure up to 1000 psi. T/IA lost 0/10 psi in 1st 15 mins and 0/0 psi in 2nd 15 mins for a total loss of 0/10 psi in 30 mins. Bled TBG/IAP FWHP's=210/150/60/120 ***IA , OA & OOA valves checked for position and tags hung upon departure*** F-04A 8/28/2008 ***JOB CONTINUED FROM 27-AUG-2008 WSR*** JET CUT 2-3/8" LINER @ 9700'. CORRELATED TO SLB SCMT LOG 8/18/06. SET 3.5" WEATHERFORD WRP MIDDLE ELEMENT @ 8400' MD. (TOP OF PLUG C~ 8398' MD, 3.77' OAL) LRS CMIT-TxIA 1000 PSI PASSED...SEE LRS WSR. JET CUT 3.5" TBG @ 8370' MD.. WRP & 3.5" TBG CUT CORRELATED TO TUBING TALLY 7/9/87 SWAB, SSV CLOSED, MASTER & CASING VALVES OPEN ON DEPARTURE. FINAL T/I/O/00= 215/100/40/120 ***JOB COMPLETE, WELL LEFT S/I*** F-04A 8/28/2008 Circ out TBG & IA (Pre RWO) Standby for E-Line & Hard Line Crews. ***Continued on 08-29-08 WSR*** F-04A 8/29/2008 ***Continued from 08-28-08 WSR*** T/I/0=300/100/40/100 Circ Out (RWO Prep) Pumped 1 bbl neat meth spear & 563 bbls 9.3# Brine down Tbg taking returns up IA through jumperline to flowline. Pumped 7 bbls diesel down Tbg. U-tubed Tx IA. Freeze protected flowline with 9 bbls neat meth, 24 bbls crude and 10 bbls heated diesel according to WOA procedure. Bled WHP's. ***Tags hung and wellhead valves checked for position upon departure*** FWP's=0/0/0/0 F-04A 8/29/2008 T/IA/OA/OOA= SI/0/0/0 Temp= cold PPPOT-T (PASS) PPPOT-IC (PASS) PPPOT-OC (PASS) (Pre Rig) PPPOT-T RU 1 HP BT onto THA test void, 100 psi bled to 0 psi, flushed void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 4950/ 15 minutes, 4900/ 30 minutes. Bled void to 0 psi, RD test equipment, cycled all LDS "Standard" ran out 1.5" and ran in and torqued, all functioned with no problems. PPPOT-IC ((9 5/8")) RU 1 HP BT on IC test void, 50 psi to 0 psi, flushed void till clean returns achieved, attempted to pressure to 3500 psi, would not build pressure above 500 psi. RU elephant gun onto packing port, injecting plastic into packing port until air free ribbon of plastic achieved, pressured to 5200 psi, on packing port. (2nd test) Pressured to 3500 psi for 30 minutes, 3500/ 15 minutes, 3500/ 30 minutes. Bled off test pressure to 0 psi, RD all test equipment, cycled all LDS "Standard" ran out 1.5" and ran in and torqued, all functioned with no problems. PPPOT-OC (( 13 3/8" )) RU 1 HP BT onto test void 200 psi bled to 0 psi, no way to flush void. Pressured to 1000 psi for 30 minute test, 1000/ 15 minutes, 1000/ 30 minutes. Bled to 0 psi, RD all test equipment. F-04A 9/2/2008 T/I/O/00=0+/0/0/0. Set 6" CIW J BPV #416 thru tree, pre-rig. 1-2' ext used, tagged ~ 108. No problems. Print Date: 10/9/2008 Page 1 of 1 http://digitalwellfile.bpweb.bp. com/WIInfo/Reports/ReportViewer. aspx Page 1 of 1 10/9/2008 • BP EXPLORATION Page 1 of 6 Operations Summary Report Legal Well Name: F-04 Common Well Name: F-04a Spud Date: 2/1/1971 Event Name: WORKOVER Start: 9/3/2008 End: 9/14/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/14/2008 Rig Name: NABORS 4ES Rig Number: Date From - To I Hours Task Code NPT Phase Description of Operations 9/2/2008 13:00 - 00:00 11.00 RIGD N WAIT PRE 9/3/2008 00:00 - 09:00 9.00 RIGD N WAIT PRE 09:00 - 00:00 15.00 MOB P PRE 9/4/2008 00:00 - 05:00 5.00 MOB P PRE 05:00 - 00:00 19.00 MOB N WAIT PRE 9/5/2008 100:00 - 14:00 I 14.001 MOB I N I WAIT I PRE 14:00 - 16:30 I 2.50 I MOB I P 16:30 - 00:00 7.50 RIGU P 9/6/2008 00:00 - 04:00 4.00 RIGD P 04:00 - 04:30 I 0.501 KILL I P 04:30 - 06:00 1.50 KILL P 06:00 - 08:00 2.00 KILL P 08:00 - 11:00 3.00 KILL P 11:00 - 12:30 1.50 WHSUR P 12:30 - 15:00 I 2.501 WHSUR I P 15:00 - 00:00 I 9.001 BOPSURP 9/7/2008 100:00 - 01:30 I 1.501 BOPSUR P 01:30 - 06:00 ~ 4.50 ~ BOPSUq P 06:00 - 08:00 I 2.001 BOPSUR P PRE PRE PRE Prepared rig for move to PBU F-Pad. Continued preparing rig for move to PBU F-Pad. Performed general rig housekeeping. Moved rig from MP I-Pad to PBU. Continued rig move. F-04 not ready for MIRU. Well house and flow line not prepared. Equipment on F-Pad obstructing rig placement. Staged rig on PBU J-Pad. Awaiting F-04 well and pad preparation. Changed fuel pump. Installed new seals in pipe machine. Changed out swabs and liners in mud pump. Continue to wait on well support to build up pad for rig. Continue maintenance on rig and painting. Moved rig from staging area on J-Pad to F-Pad. All modules on F-Pad at 16:30 hrs. Spotted sub module over F-04. Build up pad with gravel perpendicular to sub for pipe shed placement. Spot pipe shed and jack up into position. Scope and raise derrick. Spot pits and jack up to make up to sub. Connect lines, RU double annulus valve. DECOMP I PJSM. RU lubricator. P/T to 500 ressures u si au me wa across. DECOMP Spot vac trucks and take on 1 % KCL to pits. DECOMP Held crew change and performed pre-tour checks of PVT system and derrick. RU to circulate, tested lines to 250 / 3500 psi. DECOMP T/I/O = 0 psi. Circulated out diesel freeze protect fluid and displaced well with 1 % KCI brine, taking returns to tiger tank. OA pressure 0 psi throughout displacement. Pumped total of 459 bbls at 3-4 bpm, 540 - 1080 psi. Shut in and monitored well; tubing and annulus dead and stable. DECOMP Installed TWC. Tested TWC to 3500 psi for 10 charted minutes from above and to 1000 psi for 10 charted minutes from below. RD lines from tree. DECOMP Bled tubing hanger void. ND production tree and tubing head adapter flange. Functioned LDS. DECOMP NU BOPE. Replaced single gate (blind ram) with double gate -3/8" fixed, blind ram).. BOP components arranged from top to bottom: Annular, 2 3/8" pipe rams, blind rams, mud cross, 3 1/2" x 6" VBR and test spool. AOGCC rep Bob Noble waived witness of BOP test at 19:43 hrs. Function test BOP components. DECOMP Continue NU BOPE. Tighten up doors. Connect all lines. Install flow riser and air up boots. DECOMP Pressure tested all BOPE components to 250 psi low / 350_0 psi high, per BP policy and AOGCC regulations. Tested annular and 2-3/8" fixed pipe rams with 2-3/8" test joint. Tested VBR with 3-1/2" and 4-1/2" test joints. Test witnessed by WSLs Vincent Volpe and Winton Aubert, Toolpushers Paul Yearout and Don Haberthur. DECOMP Held crew change and performed pre-tour checks of PVT egiupment and derrick. Blew down lines and RD BOPE test equipment. Printed: 9/30/2008 11:55:37 AM BP EXPLORATION Qperations Summary Report Legal Well Name: F-04 Common Well Name: F-04a Event Name: WORKOVER Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 4ES Date From - To Hours Task Code NPT Start: 9/3/2008 Rig Release: 9/14/2008 Rig Number: Phase Page 2 of 6 Spud Date: 2/1/1971 End: 9/14/2008 Description of Operations 9/7/2008 08:00 - 09:30 1.50 WHSUR P DECOMP PU and MU DSM lubricator. Tested lubricator to 500 si. Pulled TWC and LD lubricator. 09:30 - 11:30 2.00 PULL P DECOMP RU control line spooling unit. PU landing joint and XO to 7" IJ4S pin. Screwed into tubing hanger. BOLDS. Pulled tubing hanger free with 100k Ib PU. Secured control lines. BO and LD tubing hanger, PU 80k Ib. 11:30 - 13:00 1.50 PULL P DECOMP CBU through 3-1/2" tubing cut at 8370'. Pumped 5 bpm at 530 psi. Had no losses nor gas in returns. 13:00 - 16:00 3.00 PULL P DECOMP POH, LD 4-1/2" tubing, spooling dual encapsulated control lines. Recovered 48 jts 4-1/2" tubing, SSSV, 24 control line clamps, 4 ss bands. 16:00 - 17:00 1.00 PULL P DECOMP RD and offloaded control line spooling unit. RD 4-1/2" handling equipment and RU 3-1/2" handling equipment. 17:00 - 00:00 7.00 PULL P DECOMP POH, LD 3-1/2" tubing. 9/8/2008 00:00 - 01:30 1.50 PULL P DECOMP POH, LD 3-1/2" tubing. LD 196 total jts, 6 GLM's, 1 cut jt (17.29'). 01:30 - 02:30 1.00 PULL P DECOMP Clean and clear rig floor. Set wear ring. 02:30 - 03:30 1.00 FISH P DECOMP Conduct weekly safety meeting. Show hands ADW performance and safety IR charts. 03:30 - 05:00 1.50 FISH P DECOMP PJSM. PUMU BHA #1: cut lip, HMC, OS, ext, bumper sub, oil jar, POS, 9 x DC, accelarator. 05:00 - 06:00 1.00 FISH P DECOMP RIH with BHA #1, PU 3-1/2" DP. 15 jts RIH at 06:00 hrs. 06:00 - 09:00 3.00 FISH P DECOMP Held crew change and performed pre-tour checks of PVT equipment and derrick. Continued RIH with BHA #1, PU 3-1/2" DP. 09:00 - 10:00 1.00 FISH P DECOMP Held weekly safety meeting with all day rig personnel. Discussed safety communications, safety alerts, recent ADW incidents, and individuals' concerns. 10:00 - 15:00 5.00 FISH P DECOMP Resumed RIH with BHA #1 on 3-1/2" DP. 15:00 - 16:30 1.50 FISH P DECOMP Tagged 3-1/2" tubing stub at 8361' DPM. LD 1 jt, PU kelly and established parameters: PU/SO/Rot 132k/111 k/120k; 43 rpm, 140a, 2800 Ib-ft, 3 bpm, 390 psi. Rotated over and dressed tubing stub with 1 k WOB. Stopped rotating, SO over stub 3' with 115k Ib. Pump pressure increased 200 psi; shut down pump. Continued SO total of 7' over stub. PU 165k Ib, jar hit. Set grapple with 2nd 165k Ib jar hit. SO to neutral weight, rotated 18 RH turns, got 1 turn back. PU 10k Ib over neutral weight, rotated 2 RH turns. ,Fluid level immediately fell out of sight and PU weight increased to 138k Ib (net gain 6k Ib). Attempted to circulate at 2 bpm, pressure increased with no returns. Parameters indicative of having disengaged K-anchor. 16:30 - 20:30 4.00 FISH P DECOMP POH with BHA #1, standing back 3-1/2" DP from 8361'to 317'. Added minimum 60 b h SW to well. 20:30 - 21:00 0.50 FISH P DECOMP PJSM. LD BHA #1. 21:00 - 23:00 2.00 FISH N WAIT DECOMP Operations stopped due to IP in pipe shed. All notifications made and traction report initiated. Took IP to MCC medical for evaluation. IP released back to work with light duty assignment. 23:00 - 00:00 1.00 FISH P DECOMP Cont to LD BHA #1. Tubing punch below collars prior to break out - no ressure. Recovered a 2 jts, 15.61' cut jt, 4.5" sliding sleeve assembly, PBR slick stick and K-anchor latch. 9/9/2008 00:00 - 01:00 1.00 FISH P DECOMP Continue to LD fish. Clean and clear rig floor. 01:00 - 02:30 1.50 FISH P DECOMP Safety shut down with WSL, Toolpusher and Nabors safety Printed: 9/30/2008 11:55:37 AM • BP EXPLORATION Page 3 of 6 Operations Summary Report Legal Well Name: F-04 Common Well Name: F-04a Spud Date: 2/1/1971 Event Name: WORKOVER Start: 9/3/2008 End: 9/14/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/14/2008 Rig Name: NABOBS 4ES Rig Number: Date From. - To i, Hours Task ' Code ~ NPT i .Phase Description of Operations 9/9/2008 01:00 - 02:30 1.50 FISH P DECOMP man. Highlight lifting /rigging of various equipment. 02:30 - 03:30 1.00 FISH P DECOMP PUMU BHA #2. 03:30 - 05:00 1.50 FISH P DECOMP RIH from 304' to 1972'. Slight gas bubble to surface. Shut town and AOGCC. 05:00 - 06:00 1.00 FISH P DECOMP Circulate the long way thru the choke at 5.5 BPM / 500 psi. Gas /crude mixture with seawater returns. 06:00 - 09:30 3.50 FISH P DECOMP Held crew change and performed pre-tour checks of PVT system and derrick. RIH with fishing BHA #2 on total of 35 stands 3-1/2" DP. CBU 3-4 bpm, 200-420 psi. Shut down pump, monitored well, fluid level falling in annulus. Resumed RIH with BHA #2 on 3-1/2" DP, total of 86 stands to 8330'. Added sufficient seawater to keep annulus fluid level within sight. 09:30 - 12:00 2.50 FISH P DECOMP CBU from 'ust above 2-3/8" liner at 8330'. Circulated 4-5 bpm at 950-1050 psi. Shut down and monitored well, annulus fluid 12:00 - 13:00 1.00 FISH P DECOMP PU 5 singles 3-1/2" DP. PU kelly and established parameters: PU 140k Ib, SO 105k Ib, 3 bpm, 400 psi, 15 rpm, 150a, 3000 Ib-ft. Tagged 2-3/8" liner fish at 8503' DPM. SO and swallowed fish without rotation. Pump pressure increased 150 psi when over fish. SO total of 3' swallow, pump pressure 570 psi. PU 1/2 kelly, gained 9k Ib weight. 13:00 - 15:30 2.50 FISH P DECOMP CBU through 2-3/8" liner fish at +/- 9700'. Pumped 3-1/2 bpm at 690 psi. Had moderate gas in returns. Pumped total of 465 bbls, until gas subsided. 15:30 - 16:30 1.00 FISH P DECOMP POH with BHA #2 and 2-3/8" liner fish. POH 15 stands, placing 2-3/8" liner fish above 7" production packer. Monitored well; static fluid losses about 25 boh. Continued adding sufficient seawater to keep fluid level in sight. 16:30 - 17:30 1.00 FISH P DECOMP Held safety stand-down with Bob Mize and day rig crew. Discussed recent incidents, general rig safety culture, examples of desirable behaviors, and individuals' concerns. 17:30 - 18:00 0.50 FISH P DECOMP POOH & stand back 3 1/2" DP. Pull 1300' until liner is above is above packer.) 18:00 - 20:00 2.00 FISH P DECOMP Hold safety stand down w/ all hands on night crew + Bob Mais & Herb Williams. Discuss last night's incidents. Review what went wrong & discuss procedures to prevent re-occurance. incorporated 2 man rule when handling equip greater than 50#. Con't continuous hole fill during safety meeting. 20:00 - 20:30 0.50 FISH P DECOMP Service rig. Inspect derrick. Check PVT alarms. 20:30 - 23:00 2.50 FISH P DECOMP Con't to POOH & stand back 3 1/2" DP. Use continuous hole fill. 23:00 - 00:00 1.00 FISH P DECOMP Hold PJSM. POOH & stand back 4 3/4" DCs. Break out & UD overshot assy & 2 3/8' liner deployment sleeve. 9/10/2008 00:00 - 02:30 2.50 FISH P DECOMP POOH & UD 2 3/8" liner. Recovered 37 joints + 16.28' cut off it. 02:30 - 03:00 0.50 FISH P DECOMP Hold PJSM. R/D 2 3/8" handling tools. 03:00 - 04:00 1.00 FISH P DECOMP Clear & clean rig floor. 04:00 - 06:00 2.00 WHSUR P DECOMP Pull wear bushing. Install test plug. R/U to test equip. 06:00 - 10:00 4.00 BOPSU P DECOMP Held crew change and performed pre-tour checks of PVT equipment and derrick. Continued RU BOPE test equipment. Tested annular BOP and choke manifold valves to 250 psi low / 3500 psi high, per BP policy and AOGCC regulations; test Printed: 9/30/2008 11:55:37 AM BP EXPLORATION Page 4 of 6 Operations Summary Report Legal Well Name: F-04 Common Well Name: F-04a Spud Date: 2/1/1971 Event Name: WORKOVER Start: 9/3/2008 End: 9/14/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/14/2008 Rig Name: NABOBS 4ES Rig Number: Date From - To ', Hours _I Task I! Code NPT Phase Description of Operations 9/10/2008 06:00 - 10:00 10:00 - 12:30 12:30 - 15:30 15:30 - 18:00 18:00 - 18:30 18:30 - 22:30 22:30 - 23:30 23:30 - 00:00 9/11/2008 00:00 - 01:30 4.00 BOPSU P 2.50 CLEAN P 3.00 CLEAN P 2.50 CLEAN P 0.50 CLEAN P 4.00 CLEAN P 1.00 CLEAN P 0.50 CLEAN P 1.50 CLEAN P DECOMP witnessed by D. Haberthur and W. Aubert. Tested annular with 3-1/2" test joint. BOPE test witness waived by J. Crisp, AOGCC at 06:05 hrs 9/10/2008. DECOMP Pulled test plug and installed wear ring. PU packer mill BHA #3: 6" mill, 3 x boot basket, bit sub, bumper sub, oil jar, POS, 9 x DC. Fluid loss steady at about 25 bph seawater. DECOMP RIH with packer mill BHA #3. Tagged 7" production packer at 8559' DPM. DECOMP LD 1 jt, PU 24' DP pup and kelly. Established parameters: PU/SO/Rot 145k/105k/123k; 80 rpm, 180a, 4000 Ib-ft; 3-1/2 bpm, 600 psi. Milled packer with 4k Ib initial WOB. DECOMP Crew change. Service rig. Inspect derrick. Check PVT alarms. DECOMP Con't to mill packer from 8559 to 8562'. Packer started to move. P/U 145K, S/O 105K, Rot 123K, 50-70 RPMs, WOB 6-15K, Pumped 3 BPM @ 380 psi. Torq = 5K. Free Torq 4K. DECOMP Circulate & pump sweep. Pump 5.4 BPM ~ 1100 psi. Pumped total of 326 bbls. DECOMP Hold PJSM for P/U DP & skate operations. DECOMP P/U & single in while pushing packer. RIH w/ 8 jts. Packer hung up ~ 8786'. DECOMP Mill acker from 8786 to 8787' Packer dro ped. P/U 147K, S/O 107K, Rot 125K, WOB 6-12K, 50-70 RPMs, Torq 5K. 3 BPM ~ 380 psi. DECOMP Hold PJSM for P/U DP & skate operation. DECOMP P/U & single in, chase fish to bottom C~3 9640'. DECOMP Circulate hole clean. Pump sweep around at 5 bpm and 1300 psi. DECOMP Held crew change and performed pre-tour checks of PVT equipment and derrick. POH with packer mill BHA #3_. Stood back 3-1/2" DP and collars. DECOMP Broke out and LD BHA #3. Cleared junk baskets, recovered about 2 gallons metal chunks, shavings and debris. PU bit and scraper BHA #4: 6" bit, 7" scraper, 3 x boot baskets, bit sub, bumper sub, oil jar, POS, 9 x DC. DECOMP RIH with bit and scraper BHA #4 on 3-1/2" DP. RIH w/ 89 01:30 - 02:30 1.00 CLEAN P 02:30 - 03:00 0.50 CLEAN P 03:00 - 03:30 0.50 CLEAN P 03:30 - 06:00 2.50 CLEAN P 06:00 - 11:30 I 5.50 I CLEAN I P 11:30 - 13:30 ~ 2.00 ~ CLEAN ~ P 13:30 - 16:30 3.00 CLEAN P 16:30 - 17:00 0.50 CLEAN P 17:00 - 18:00 ~ 1.00 CLEAN ~ P 18:00 - 19:00 I 1.001 CLEAN I P 19:00 - 19:30 0.50 CLEAN P 19:30 - 20:00 0.50 CLEAN P 20:00 - 20:30 0.50 CLEAN P 20:30 - 21:30 1.00 CLEAN P 21:30 - 00:00 2.50 CLEAN P 9/12/2008 00:00 - 03:30 3.50 CLEAN P 03:30 - 04:00 0.50 CLEAN P 04:00 - 05:30 1.50 CLEAN P 05:30 - 06:00 0.50 CLEAN P 06:00 - 09:00 3.00 BUNCO DECOMP Stand back stand 89 & work scraper over 8526 to 8432'. Worked up & down 3 times. DECOMP Reverse circulate hole 2 times the DP volume at 3 BPM and 400 PSI. DECOMP Held crew change and performed pre-tour checks of PVT equipment and derrick inspection. Serviced rig. DECOMP Tripping out of hole and laying down DP. DECOMP Crew held apre-job safety meeting. DECOMP RIH with 11 stands from derrick. DECOMP Service rig and adjust breaks on drum. DECOMP Con't tripping out of hole and laying down DP Out of hole w/ 115 jts. DECOMP Finish POOH & LDDP. UD 298 jts. DECOMP Hold PJSM to UD BHA. DECOMP Break out & UD BHA #4. DECOMP Clean out boot baskets. Clear & clean rig floor. RUNCMP Held crew change and performed pre-tour checks of PVT Printed: 9/30/2008 11:55:37 AM BP EXPLORATION Page 5 of 6 Operations Summary Report Legal Well Name: F-04 Common Well Name: F-04a Event Name: WORKOVER Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 4ES Start: 9/3/2008 Rig Release: 9/14/2008 Rig Number: Spud Date: 2/1 /1971 End: 9/14/2008 Date ~~ From - To Hours Task I Code I NPT 9/12/2008 06:00 - 09:00 3.00 BUNCO 09:00 - 18:00 9.00 BUNCO 18:00 - 18:30 0.50 RUN 18:30 - 22:00 3.50 RUN 22:00 - 00:00 2.00 RUN 9/13/2008 00:00 - 00:30 0.50 RUN 00:30 - 01:30 1.00 RU 01:30 - 06:00 4.50 RU 06:00 - 07:30 I 1.50 07:30 - 09:00 1.50 WHSUR P 09:00 - 17:00 8.00 BOPSU P 17:00 - 18:00 1.00 WHSUB P 18:00 - 18:30 0.50 WHSUR P 18:30 - 19:30 1.00 WHSUR P 19:30 - 20:30 1.00 WHSUR P 20:30 - 23:30 3.00 23:30 - 00:00 0.50 Phase Description of Operations RUNCMP equipment and derrick. MU running tool on DP joint and pulled wear ring. RD DP handling equipment and cleared rig floor. RU single joint compensator, torque turn and tubing handling equipment. Fluid loss about 10 bph seawater. RUNCMP PU and BakerLoc'd tailpipe ass'y: WLEG, XN, 1 jt tubing, X, S-3 packer. Continued RIH with 4-1/2" 12.6#, 13Cr80 VAM Top tubing. Used Jet Lube Seal Guard thread compound and U VAM Top connections to 4440 Ib-ft. 128 jts RIH at 18:00 hrs. RUNCMP Crew change. Service rig. Inspect derrick. Check PVT alarms. RUNCMP Con't to RIH w/ 4 1/2" 12.6#, 13Cr-80 Vam top completion.Ran 151 jts. Used Jet Lube Seal Guard thread compound. Torque Turn all connections to 4440 ft-Ibs. RUNCMP RIH w/ 4 1/2" 12.6#, 13Cr-80 VamAce. Continued to use Jet Lube Seal Guard thread compound. Torque all connections to 3620 ft-Ibs. RIH w/ 40 jts. RUNCMP Finish RIH w/ 4 1/2" 12.6# 13Cr-80 VamAce Tubing. Use Jet Lube Seal Guard thread compound. Torque all connections to 3620 ft-Ibs. Ran 49 jts. Total joints RIH = 209. RUNCMP PU and land 4 1/12" tubin han er, Run in lock down screws. 4.5" WLEG at 8605', 4.5" XN nipple w/ RHC-M plug at 8594', 4.5" X nipple at 8531', Baker S-3 Packer 7" x 4.5" at 8508', 4.5" X nipple at 8487', 4.5" x1" KBG-2 GLM w/ Dummy SBK-2 Latch at 8418", 4.5" xi"KBG-2 GLM w/ Dummy SBK-2 Latch at 6631", 4.5" x1" KBG-2 GLM w/ DCK-2 SV BEK Latch at 3410", and a 4.5" X nipple at 2088". RUNCMP RU and Displace 120 bbls of 120 degree sea water. Followed with 125 bbls of 120 degree inhibited sea water. Pumped 3 BPM C~ 160 psi. RUNCMP Held crew change and performed pre-tour checks of PVT equipment and derrick. Dropped ball /rod. Pressured tubing to 3500 psi to set packer and held ressure for 30 charted minutes -tubing MIT. Bled tubing pressure to 1500 psi. Pressured annulus to 3500 si and held for 30 charted minutes - IA MIT. Bled tubing pressure and observed DCR valve shear. Confirmed DCR shear by circulating both ways through valve at 3 bpm and 1160 psi. RUNCMP Installed TWC. Tested TWC from above to 3500 psi for 10 charted minutes and from below to 1000 psi for 10 charted minutes. RUNCMP econfigured ROPE. Removed pipe rams from double gate cavities and replaced double gate with single gate. ND BOPE. Set BOP stack back. RUNCMP N/U adapter flange. RUNCMP Crew change. Check PVT alarms. Inspect derrick. Service rig. RUNCMP Finish N/U adapter flange. Preesure test hanger void to 5000 psi for 30 min. Ok. RUNCMP N/U tree. check all studs. Fill tree & pressure test to 5000 psi for 15 min. OK. RUNCMP Spot in Hot oilers. R/U lines to tree. Pressure test lines to 3500 psi, Ok. Freeze protect IA w/ 150 bbls of diesel. Pumped 1.7 BPM C~ 600/900 psi. RUNCMP U-Tube freeze protect between IA and tubing. Printed: 9/30/2008 11:55:37 AM Printed: 9/30/2008 11:55:37 AM JEILHEQC3 = McEVOY ,CTUATOR = ___ :B. ELEV - 22.4' F. ELEV = 39.17 :OP = 3000' lax Angle = 96 @ 10812' Tatum MD =_ 10246' Datum TVD = 8800' SS 9-5/8" CSG, 47#, NSCC, ID = 8.681" 2000' 18-5/8" CSG, 96.5#, K55, ID = 17.689" 2004' 13-3/8" CSG, 72#, N-80, ID = 12.347" 2022' N~°'li U ~ ='~ ',,,r:y ~ TOP OF 2-3f8" ~Ft 4-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" ~ 8605' 7" TBG, 26#, L-80, ID = 6.276" I 8642' TOP OF 7" LNR $642' SAFETY NOTES: COMMUNICATION IN 18-5/8" x 13- F 04A 3/8' ULUS (FILLED WITH CRUDE). 1934' --113-3/8" BAASCH ROSS CSG PATCH 2000' 9-5/8" X 7" XO 2022' 13-3/8" X 9-5/8" XO 20 4-112" HES X NIP, ID = 3.813" t;A ~ I_ It=T MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3410 33$7 23 KGB-2 DOME BK 16 09124108 2 6631 5919 39 KGB-2 SO BK 20 09/24108 1 8418 7338 35 KGB-2 DMY BK 0 09112;08 $4$7" -~ 4-112" HES X NIP, ID = 3.813" $50 7" X 4-1f2" BAKER S-3 PKR 8531' 4-112" HES X NIP, ID = 3.813" 8594' 4-112" XN NIP, ID = 3.725„ $$Q5" 4-112" WLEG 9-5/8" CSG, 47#, N-80, ID = 8.681" ~~ 9312' 2-3/8" LNR, 4.6#, L-80, .0039 bpf, ID = 1.995" -9700 PERFORATION SUMMARY REF LOG: SWS MEM CNL ON 03/01/03 ANGLE AT TOP PERF: 90 @ 10540' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1-1/2" 4 10540 - 10610 O 03/02/03 1-1/2" 4 10700-10850 O 03/02/03 1-1 /2" 4 10930 - 11020 O 03102/03 9762' -{ ESTIMATED TOP OF CEMENT SCMT (08/18/06) 9876' 7" MARKERJT MILLOUT WINDOW 10010 ' - 10016' CEMENT RAMP 10010' 1 7" LNR, 29#, N-80, .0371 bpf, ID = 6.184" ~-~ 10665' 2-3/8" LNR, 4.6#, L-80, .0039 bpf, ID = 1.995" I 11193' I PBTC DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/26/76 ORIGINAL COMPLETION WELL: F-04A 05/26/87 LAST WORKOVER PERMff No: 2021000 03/03/03 DAC/KK CTD SIDETRACK (F-04A) API No: 50-029-20089-70 09/14/08 N4ES RWO SEC 2, T11 N, R13E, 2308' FSL & 2395.9' FWL 10/02/08 JLJ/TLH GLV C/O (09124/08) BP Fxolnrafinn (Alaska/ Well Job# Loa DescriDtion Date BL Color CD C-11A 11225983 LDL 07/02/06 1 B-25 11217247 LDL 05/11/06 1 F-06A 11258688 PROD PROFILE W/DEFT 03/20/06 1 G-18A 11209612 MEM INJECTION PROFILE 07/19/06 1 P-24 11216206 MEM INJECTION PROFILE 07/06/06 1 B-28 11221590 LDL 07/04/06 1 B-01 11211508 PROD LOG W/DEFT 06/23/06 1 W-39A 11216197 MEM PROD PROFILE OS/29/06 1 Z-02A 11212856 INJECTION PROFILE 05/02/06 1 G-03A 11211493 LDL OS/24/06 1 C-26A 11225979 LDL 06/07/06 1 F-26B N/A MEM PROD & INJECTION 06/06/06 1 F-26B N/A MEM BORAX LOG 06/06/06 1 W-39A 11216197 MEM BORAX LOG OS/29/06 1 F-04A 11221602 SCMT 08/18/06 1 Y-OBA 11221604 SCMT 08/20/06 1 C-06B 11212883 USIT 08/15/06 1 X-27 11217274 USIT 08/26/06 1 K-07D 10942217 MEMORY SCMT 06/15/05 1 Y-1OA 11209611 MEM INJECTION PROFILE 07/18/06 1 F-12 11225984 LDL 07/02/06 1 K-07D 11058256 SBHP SURVEY 11/28/05 1 X-04 10919925 PROD PROFILE W/DEFT 12/15/04 1 A-30A 11054295 CH EDIT OF PDC LOG W/GR 04/06/05 1 17-04B 40010183 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 03/09/04 1 1 Z-30A 40010092 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 01/27/04 1 1 17-04B PB1 40010183 OH EDIT OF MWD/LWD 03/08/04 2 1 Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503·2838 ATTN: Beth f}();)-I ad SCANNED SEP 14 2005 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 r::: - - _.~ - r-< :~ ..." t.,r_~~~: ,; .J .::)1.:"( 08/28/06 .i. ;;. ~0uò NO. 3941 ~CR & Gas Cons. CQmrniWoo Anchorage State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Company: Field: Prudhoe Bay . . Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth . . ':" 'r' ;" MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _lnserts\Microfilm_ Marker.doc J!1p ~~- DATA SUBMITTAL COMPLIANCE REPORT 4/1/2005 Permit to Drill 2021000 Well Name/No. PRUDHOE BAY UNIT F-04A Operator BP EXPLORATION (ALASKA) INC 5fl~J.. Â.5 ~J,- 4'vI:JT API No. 50-029-20089-01-00 MD 11206 ,/ TVD 9019 ~ Completion Date 3/3/2003 ~ Completion Status 1-01L ------~- REQUIRED INFORMATION Mud Log No Samples No --------- ------- DATA INFORMATION Types Electric or Other Logs Run: CCL, GR, MWD, Memory CNL Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name r ED-:-:-C-u- [..-11 719 Neutron J~~' Neutron I vtP1 Directional Survey I pt Directional Survey t~D Pdf Directional Survey þiD D Directional Survey 0:~1 C Tf ~81 LIS Verification ~ LIS Verification k6 C Pds 181 Gamma Ray I~ Gamma Ray vf:~ C ~301 Gamma Ray C Lis 2301 Gamma Ray ~g------ Gamma Ray Log Log Run Scale Media No 1 25 Blu 25 25 Blu 25 25 Blu Well Cores/Samples Information: Name Interval Start Stop Received Sent Current Status 1-01L UIC N Directional su:~y~ (data taken from Logs Portion of Master Well Data Maint) Interval OHI -- Start Stop CH Received Comments 8415 11155 Open 5/13/2003 8415 11155 Open 5/13/2003 10783 11206 Open 5/15/2003 10010 11226 Open 5/15/2003 PB1 10783 11206 Open 5/15/2003 10010 11226 Open 5/15/2003 PB1 9904 11206 9/25/2003 9904 11206 9/25/2003 9897 11206 9/25/2003 Gamma Ray - MWD 9897 11206 9/25/2003 Gamma Ray - MWD 1'13 i 1 9897 11226 12/11/2003)P61 9897 11226 12/11/2003 9897 11226 12/11/2003 ¡lí)i rlJj) k_,-,"",:_ Sample Set Number Comments Permit to Drill 2021000 MD 11206 TVD 9019 ADDITIONAL INFORMATION Well Cored? ~ Chips Received? Y / N Analysis Received? '-¥IN ---~ Comments: -_._--~-- ----- Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 4/1/2005 Well Name/No. PRUDHOE BAY UNIT F-04A Operator BP EXPLORATION (ALASKA) INC Completion Date 3/3/2003 Completion Status 1-01L Current Status 1-01L Daily History Received? (j)N (DN Formation Tops ~ Date: API No. 50-029-20089-01-00 UIC N '-, tj ¡¡, Mø r-- - ), ÐoC9 "(CÕ ) Transmittal Form r&l. BAKER HUGHES INTEQ Anchorage GEOScience Center To: AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 Attention: Lisa Weepie Reference: F-04APB1 II Contains the following: 111 LDWG Compact Disc Jf9.30 \ , (Includes Graphic Image files) 1 LDWG lister summary ii Ii II P t¡ L il ! ~ i ~ n ¡¡ Ii ¡¡ H II 1 blueline - OR/Directional Measured Depth Log I blue line - OR/Directional TVD Log "J) H \I Ii. ¡ ~ I 11 ii i¡ li il. 11 1\ Ii "I II II !I ,., II I [ LAC Job#: 435828 Sent By: Glen Horel Received BY~\ ~ .~ \.<J ~..::::::~.:::}-.....~ Date:fitiœVE D Date: OFC 11 ?003 Aiaska Oil & Ga$ Con&.. Çommis8i0n Anchorage PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 ""':-::-::; -.... < . ,. t". ~-;\'~~í\ '- ~~'::> rT":~~'::~~::'::::':'-"1 -ww-w----··i,¡,;,~;_'ì::~l;;.;·~;rw-'....----.- .rill .',' "''f' I'N¡" " ... __ ~',." ~'~" ,1I'Ni,1' ..'1 '<"I~ M... -.. .- ,.. lIr.'Il',\IIo'\J',"'''.'¡1 :_.... ....øI -" ...'1:; ""'1,' _'11' .." __¡..~...".~'" ..." ,. "'';''' '.. ____________w__,_____._,_ L~ ¡ - '¡t~·~"'_ ~;7~.~::?~~~ .~ '.-". ,.--- ..._--_.~_._..-~ ~~:-~.,lM- ----..-"-.- ) Transmittal Form INTEQ To: AOGCC 333 West ih Ave, Suite 100 Anchorage, Alaska 99501 Attention: Lisa Weepie Reference: F-04A I Contains the following: 1 LDWG Compact Disc (Includes Graphic Image files) 1 LDWG lister summary ') ðÖ6-\00 r&l. BAKER HUGHES Anchorage GEOScience Center 1 blueline - OR/Directional Measured Depth Log 1 blueline - GR/Directional TVD Log LAC Job#: 435828 Sent By: Glen Horel Received BY~-~ ~ '-<:;, ~~ Da~e·:" Ser'·'~·p;'· " f~f}'f:' .', ,- '~~ ~"T.I:~,¡}' i¡:L.....\. . ~ I, .}f ",n['1~ ~ ,I ;~. ~J. I~~~l.~.,::-~ «~,,~~~' ~~!'fi~I'I, J.¡ \oJ; .._~ ~..JI Date: r.rn t' I'" ,'I),A':' ,Jt¡-- L ~ L'·)\",.) J,jU.s~¡;d ;.:: '.,,«~,;;. '..:·Cii1n1i$ion PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & ftErnRNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 r'r:::p~~-:~~,,, my¡ T ""' I . ..-....... -;";~'·-·::·;¡'·;'l:!\~:.:i:'~';-j r~ ~. ~''',~:' ., ~" ~;~-~~---,--~~_...~. _.~.',.,-;'~~_...~:~~ 1llUll»:1I\ _III 'i&o\ "'~ _'nIILl( : "'"...,-. .~.'" ,.......,....,... u...._,..... .....',""" t !___..__...jl£:~";,~;;__._.._____ ~~~:~..'''.'' '~'r.r-· '" ~_~;:'=~f:ª I 1i:J." 'I~ ."\I',~ ' ',:1' i:a:,...·;;;~·.· ... ;'~ .:~?"!!. ; ....101..'.. . ---------- la,,,,,·. .-~..-_.-..__.__..-._--- :-...-- - --'~-'- \-,.- L__.________.____..._.__ z ,,'''1 ..;..- Schlumbepger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth 05/08/03 NO. 2772 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job # Log Description Date Blueline Prints E-02A í £f '1 .... í .J,~ MEMORY PROD PROFILE 03/15/03 1 E-31A ..:l.-7-> -ii. MEMORY PROD PROFILE 08/08/02 1 M-29A 'fÆ:- PDC & TEMPERATURE 04/15/03 1 F-04A -' S:A:.-"'" 23097 MCNL 03/02/03 1 H-21 -7 I 23074 RST-SIGMA 01/30/03 1 'D.S.1-32A. o.~-IB_~ 23083 MCNUBORAX 02/02/03 1 -D.S. 5-0GA '~0f{ 23056 RST-SIGMA 01/23/03 1 D.S.7-29B I -~'. 23096 MCNL 02/15/03 1 D.S.15-38A I . ~O'; 23089 LINER TOP TIE-IN MGRlCCL 02/10/03 1 0.5. 15-48A f 1'5"""-' :Jr.5. 23098 MCNL 02119/03 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: t)iC:0CJ\ J~-=O' . :1 ~.~ ~ ~. :¡ ii. '\.;¡F . -~ ':\~... ~ LÜIMI!I J '~ ~~- MA Y Î 3 200,3 ,';·!sJka ;Ji¡ ,~ \3a5 Cons. (,~ff:m~~n Anc.t¡~-3 CD 1 1 1 1 1 1 1 ~. Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Receivd~(~ ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well 181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 23081 NSL, 2396' EWL, SEC. 02, T11N, R13E, UM At top of productive interval 2986' NSL, 1140' EWL, SEC. 01, T11N, R13E, UM At total depth 3746' NSL, 1128' EWL, SEC. 01, T11 N, R13E, UM X = 655941, Y = 5975348 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field I Prudhoe Bay Pool KBE = 57.1' ADL 028280 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 2/23/2003 2/2712003 3/3/2003 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 11206 9019 FT 11156 9017 FT 181 Yes 0 No 22. Type Electric or Other Logs Run CCL, GR, Memory CNL, MWD 23. ~. CASING SIZE Classification of Service Well \!jl~'" \-'~.~ .. ì~:;:;. ,,,,,,,.., 9. X = 651960, Y = 5973828 ",{ ,~/~~~\~;,;':L) " t:~j, .~! :;~. ",...AJ,..t4.r.:l..,J"':"~......+ ~1X~i'.~~'~~~'-':;~: , 7. Permit Number 202-100 8. API Number 50- 029-20089-01 Unit or Lease Name Prudhoe Bay Unit X = 655969, Y = 5974589 10. Well Number F-04A 15. Water depth, if offshore 16. No. of Completions NIA MSL One 20. Depth where SSSV set 21. Thickness of Permafrost (Nipple) 1901' MD 1900' (Approx.) 30" 18-5/8" 13-3/5· x 9-5/5" 9-5/8" X 7" 2-3/8" WT. PER FT. Stove 96.5# 68# 147# 47# 129# 4.6# GRADE Pipe K-55 K-55 / N-80 N-80 L-80 CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE Surface 96' 36" Surface 2004' 24" 9200 sx Permafrost Surface 9312' 12-1/4" 2410 sx Class 'G', 1775 sx PF II Surface 10010' 12-1/4" x 5-1/2" 460 sx Class IG' 8483' 111931 3" 51 sx Class 'G' CEMENTING RECORD AMOUNT PUllED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 1-1/2" Gun Diameter, 4 spf MD rvD 10540' - 1 0610' 9029' - 9029' 10700' - 108501 9029' - 9023' 10930' - 11020' 9016' - 9014' MD rvD 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2", 12.6#, L-80 19651 3-1/2", 9.3#, L-80 8583' 8542' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 20001 Freeze Protected with 18 Bbls MeOH 27. Date First Production March 21,2003 Date of Test Hours Tested 3/28/2003 4 PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR Oll-BBl TEST PERIOD 2,095 Oll-BBl GAs-McF 1,351 GAs-McF WATER-BBl 85 WATER-BBL CHOKE SIZE GAS-Oil RATIO 90.55° 645 Oil GRAVITY-API (CORR) 27.1 Flow Tubing Casing Pressure CALCULATED Press. 171 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core ~-5~~1:~¡: ~þ_,,:; ~::: ~ \i No core samples were taken. PYR 0: 3 2' l~ I ~ \' i, '.1 (ìJ!( \-I, r:,¡;(: ¡ .Jh~v. ",',. ,... ;;r <\:_I~.::.~J"::; Form 10-407 Rev. 07-01-80 QBOMS 8Fl ORIGINAL I~~m 7 GrV Submit In Duplicate ) ) 29. Geologic Markers 30. Formation Tests Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered and Depth Depth gravity, GOR, and time of each phase. Top CGL 10058' 8688' Base CGL 10152' 8771' 25N 10207' 8821' 25P 10213' 8827' 22P 10290' 8898' 21N 103551 8956' 21P 10364' 8963' Zone 1 B 10418' 9000' 14N 10426' 9003' 14P 10438' 90081 lJ.. 31. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Tenie Hubble ..-( ~ ~ litle Technical Assistant Date ()li -D~. 0 ~ F-04A 202-100 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer: Ted Stagg, 564-4694 INSTRUCTIONS ITEM 1: Classification of SelVice Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply far injection, abselVatian. injection for in-situ combustion. GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 5: indicate which elevation is used as reference (where not otherwise shown) far depth measurements given in ather spaces on this fann and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals far only the interval reported in item 27. Submn a separate fann lor each additional intelVal to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (Gl) or other elevation (OF, KB, etc.). lõEM 28: If no cores taken, indicate 'none'. ITEM 27: Method of Operation: Flowing, Gas lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Form 10-407 Rev. 07-01-80 o RIG I N .~ ! .. ) ) BP EXPLORATION QperationsSummaryReport Page·1 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-04 F -04a REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 2/18/2003 Rig Release: 3/3/2003 Rig Number: N2 Spud Date: 2/1/1971 End: 3/3/2003 Date From - To Hours Task Code NPT Phase Description of Operations 2/18/2003 0.00 DECaMP 0.00 WEXIT 0.00 PROD1 23:15 - 23:30 0.25 MOB P PRE Hold PJSM 1 Rig Move operations meeting with rig crews, Drilling Support and Security. 23:30 - 00:00 0.50 MOB P PRE Start mobilization to F-04a. 2/19/2003 00:00 - 13:30 13.50 MOB P PRE Continue rig move to F-04a. On location at 1330 hrs. 13:30 - 18:00 4.50 MOB P PRE Install 1.25" thick shim plates under front A-leg sections. 18:00 - 18:20 0.33 MOB P PRE Crew change. TL and PJSM review plan forward and discuss SOP's for raising derrick. 18:20 - 22:00 3.67 MOB P PRE Raise derrick. Pick-up coil injector and stab e-line coil. 22:00 - 22: 1 0 0.17 MOB P PRE PJSM pulling over wellhead assembly. 22:10-23:00 0.83 MOB P PRE Position rig over well. 23:00 - 00:00 1.00 BOPSURP PRE Accept rig at 2300 hrs. Start NU of BOPE. 2/20/2003 00:00 - 01 :30 1.50 BOPSURP PRE Nipple up BOPE. 01 :30 - 06:00 4.50 BOPSURP PRE Test BOPE 250 psi low 3500 psi high for 5 min each. Choke manifold. Annular 2500 psi high. AOGCC rep Chuck Shieve waived witnessing test. 06:00 - 06:45 0.75 BOPSUR P PRE Crew change; SafetylTech limit meeting. 06:45 - 07:30 0.75 RIGU P PRE Take on 2 ppb biozan water. lAP = 0; OAP = 0 07:30 - 10:15 2.75 RIGU P WEXIT PU inj. Install CTC to bury end of cable. Stab on well. PT inner reel valve. Reverse thru kill line for slack management and to displace methanol. Pumped up to 2.8 BPM; 4000 psi. Did not hear any rattling. Blow back end of coil with rig air. Unstab. Cut back coil -- cut 25' before finding cable. RD cutter. 10:15-12:15 2.00 STWHIP P WEXIT Install E-line CTC. 12:15 -14:00 1.75 STWHIP N SFAL WEXIT Troubleshoot high resistance in coil E-line -- could not find cause. Check well -- dead. 14:00 -15:30 1.50 STWHIP P WEXIT MU pilot milling BHA (D331 on 1.75 deg Weatherford motor). 15:30 - 17:30 2.00 STWHIP P WEXIT RIH. RIH thru tailpipe area -- smooth. RIH and tag cement top at 9936' uncorrected. 17:30 - 18:15 0.75 STWHIP P WEXIT Log tie-in. Correct depth (-38'). TOC 9898' md 18:15 - 23:25 5.17 STWHIP P WEXIT Mill highside pilot hole. Good cement starting at 9900'. Rate 1.68 bpm inlout. Free-spin 3200, 200-300 motor work. 2-3k wob, 12'-18'/hr initial increasing to 25-30'/hr at 9920'. 30-40'/hr 9960 to 10002'. Flop TF over to 180 and drill to 10009'. Good pressure 1 reactive torque indication seen at 10009'. 23:25 - 00:00 0.58 STWHIP P WEXIT TOH stop and flag EO BHA at 9897'. Try to open EDC circ port but no indication from surface readout equipment that it opened. Attempt to open again then lost all comms with downhole equipment. 2/21/2003 00:00 - 01 :15 1.25 STWHIP P WEXIT Continue TOH. Set back injector. 01:15 - 01:30 0.25 STWHIP P WEXIT UD BHA #1. Discover that the EDC had disconnected leaving the following fish in the hole. Mill and motor, BH Inteq orientor, pressure sensor, gamma ray package, lower portion of disconnect. Total length 43.33' 01 :30 - 03:30 2.00 FISH N DFAL WEXIT Call Baker TT and town engineer to dicuss options. Fish may be setting on top of cement plug in the 7" csg (35 deg hole angle) or may have fallen back down the just drilled 2.74" pilothole. Decided that Slickline would offer the best options at this time. 03:30 - 06:00 2.50 FISH N DFAL WEXIT Rig up slickline unit: 0.125 wire; 80% strength = 2400 lb. MU Printed: 4/2/2003 11 :30:41 AM ) ) Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-04 F-04a REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 2/18/2003 Rig Release: 3/3/2003 Rig Number: N2 Spud Date: 2/1/1971 End: 3/3/2003 Date From - To Hours Task Code NPT Phase Description of Operations 2/21/2003 03:30 - 06:00 2.50 FISH N DFAL WEXIT tools: 2-1/2" GR (shear up to release), SJ, KJ, OJ, 8' stem, RS. 06:00 - 08:00 2.00 FISH N DFAL WEXIT RIH. Clean thru tailpipe. Wt check: 600 Ib up. Tag fish 9880' SLM (depth suggests fish is on top of cement plug). Latch fish first try. Jar up 4 times at 1400lb and sheared off. Looks like fish may have moved 8', POOH. Slight wt bobble thru tailpipe 8595'. 08:00 - 08: 15 0.25 FISH N DFAL WEXIT Swap GR with GS (shear down to release). 08:15 -11 :00 2.75 FISH N DFAL WEXIT RIH. Latch fish 9877' up. Start jarring up to 1500 Ibs. Lost use of oil jars, but spangs got it free. POOH. Clean through tubing tail. 11 :00 - 11 :30 0.50 FISH N DFAL WEXIT LD fish -- recovered. RD slickline. 11:30-12:30 1.00 STWHIP P WEXIT MU milling BHA #2: 2.5 deg fixed motor (output shaft turned to 2-1/8"; 1-step DSM). Cycle circ sub open/close to 20%. Looks OK. 12:30 - 14:30 2.00 STWHIP P WEXIT RIH. Tight and stacking getting BHA started into the hole (4-1/2" tubing at surface). Required pumping (bit spinning) at 0.3 BPM to get it moving downhole. SD pumps when we got enough weight to push BHA down. RIH. Sat down at 8558' CTM. Roll pumps to get through. RIH. Correct depth at flag (-41'). 14:30 - 14:45 0.25 STWHIP P WEXIT Log tie-in at 9818' GR spike. Correct depth (-1 '). 9862' E = 9982' M (mechanical was not zeroed at surface). 14:45 - 15:30 0.75 STWHIP P WEXIT RIH with highside TF. Tag cement top 9904'. Roll pump. Got thru. RIH. Tag dry 10012'. PUH. RIH slow at 1.7; 3600 psi. MW at 10,010.3' (but significant stack approaching this depth). Flag pipe here. Stall here. PU l' per program, still in a stall. PUH. RIH. MWat 10,010.1'. PUH to 10009.3'. 15:30 - 00:00 8.50 STWHIP P WEXIT Time mill window per table in program from 10009.3' to 10013'. 2/22/2003 00:00 - 01 :30 1.50 STWHIP P WEXIT Continue milling window per schedule. 10013' to 10017' 01 :30 - 02:30 1.00 STWHIP P WEXIT Drilling formation from 10017' - 10018'. Pick back up through window. Had some trouble reaming back thru with serveral stalls. 02:30 - 03:00 0.50 STWHIP P WEXIT Continue drilling ahead 1.65 bpm in/out 2.5-3k wob, 15-20'/hr. Drill to 10023'. 03:00 - 03:45 0.75 STWHIP P WEXIT Continue working window area while CBU. Window = 10010' - 10016'. 03:45 - 05:45 2.00 STWHIP P WEXIT TOH for Crayola mill. Flag EOP at 9897'. 05:45 - 06:00 0.25 STWHIP P WEXIT LD one-step mill. Mill had significant wear on leading edge where brass was brazed on. Diamonds missing from matrix. Items for discussion: are we causing any damage to these mills with brazing process? 06:00 - 06:30 0.50 STWHIP P WEXIT BHA 2.73" Crayola mill on 1.75 deg motor. 06:30 - 08:30 2.00 STWHIP P WEXIT RIH. lAP = 300 psi; OAP = 500 psi. 08:30 - 08:45 0.25 STWHIP P WEXIT Correct depth at flag (-43'). Log tie-in. Correct (+1'). 08:45 - 09:30 0.75 STWHIP N DPRB WEXIT RIH. Tag TOC at 9901', fell thru. RIH at 180 TF. Tag dry 10011'. Repeat. Repeat. Can't get past top of window. Roll pump at min rate. No go. Try full rate. No go, stall at 10011.4'. Try dry at 160L and 160R. No go. 09:30 - 10:30 1.00 STWHIP P WEXIT PUH above cement, open circ swap, and swap well to Flo-Pro at 2.0 BPM (max rate that BHI will let us pump thru circ sub; same rate we could get thru the motor. Other than bit protection for high bend motors, not sure there's any advantage of opening the circ sub). Printed: 4/2/2003 11 :30:41 AM ) ) Page 3 of 7 QperatlonsSummary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-04 F -04a REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 2/18/2003 Rig Release: 3/3/2003 Rig Number: N2 Spud Date: 2/1/1971 End: 3/3/2003 Date From - To Hours· Task Code NPT Phase Description of Operations 2/22/2003 10:30 - 10:45 0.25 STWHIP N DPRB WEXIT Reconfirm tie-in. No correction. 10:45 - 11 :00 0.25 STWHIP N DPRB WEXIT RIH and tag dry 10011'. Set down a little weight, orientto try and skip thru. No go. PUH. RIH at minimum rate. Stall 10011.2'. 11:00-13:00 2.00 STWHIP N DPRB WEXIT POOH for different mill. 13:00 - 13:30 0.50 STWHIP N DPRB WEXIT MU 2.72" used crayola mill with bald nose (no cut-rite on nose). Also, mill has no metal munchers. 13:30 - 15:45 2.25 STWHIP N DPRB WEXIT RIH. Correct depth at flag (-38'). 15:45 - 15:50 0.08 STWHIP N DPRB WEXIT Log tie-in. Correct depth (-1'). 15:50 - 16:00 0.17 STWHIP N DPRB WEXIT RIH dry with 180 TF. Tag 10012'. Repeat. Roll pumps and tag 10011.7'. Will need to mill down. 16:00 - 19:00 3.00 STWHIP P WEXIT Mill down. Stall 10012.5'. PU; work back down. Moderate motor work (100 psi) from 10014'-10016'. Heavier motor work starting 10016'. Stall 10018'. PU; work back down. Make another pass down without problem. Ream back up to 10009'. Make 2 dry passes in/out without problems. 19:00 - 21 :20 2.33 STWHIP P WEXIT TOH for build assembly. Flagged EOP at 9800'. 21 :20 - 21 :55 0.58 DRILL P PROD1 LID BHA #4 and P/U BHA #5 21 :55 - 00:00 2.08 DRILL P PROD1 TIH to flag correct -40'. 2/23/2003 00:00 - 00: 1 0 0.17 DRILL P PROD1 Position GR at 9810' and log down. No correction. 00:10 - 05:00 4.83 DRILL P PROD1 Directionally drill build section from 10023' to 10082'. 1.8 bpm in/out, 3500 psi off-btm 200-400 psi motor work. 2-3k wob 05:00 - 05: 15 0.25 DRILL P PROD1 Pull above window. Stop for flow check. Very slight increase in volume last 4 hrs. Appears to be air in mud. Putting in 10 gal Defoamer. 05:15 - 06:30 1.25 DRILL P PROD1 Drill to 10095'. ROP about 10 FPH. 06:30 - 09:00 2.50 DRILL P PROD1 Drill to 10110'. ROP is dropping. Ratty drilling with 500 psi - 700 psi stalls ("feels" weak for the extreme motor). 09:00 - 12:30 3.50 DRILL P PROD1 Drill to 10120', staying ratty with a bunch of stalls. Hoping to see good azimuth before tripping, but wasting too much time with this low ROP. 12:30 - 14:00 1.50 DRILL P PROD1 POOH. 14:00 - 14:30 0.50 DRILL P PROD1 LD DSX100 (T-rex cutters). 8-3. Nose RO, no cutting structure left -- typical 23 wear. PU RR DS100 (cutters not T-rex). 14:30 - 14:55 0.42 DRILL P PROD1 RIH. Correct depth at flag (-45'). 14:55 - 16:00 1.08 DRILL P PROD1 Log tie-in. Correct depth (+4'). Note: Only 3-1/2 hours to trip out, change bit, trip in, and tie-in -- congrats to the crew. 16:00 - 16:30 0.50 DRILL P PROD1 RIH. 16:30 - 00:00 7.50 DRILL P PROD1 Directionally drill f/ 10120' to 10258'. 1.85 bpm in/out 3450 FS 3-500 psi MW Started drilling good then dropped off to ratty drilling. Avg 18'hr. 2/24/2003 00:00 - 01 :00 1.00 DRILL P PROD1 Directionally drill f/ 10258' to 10270'. 01 :00 - 01: 15 0.25 DRILL P PROD1 Wiper to just below window. 01 :15 - 02:30 1.25 DRILL P PROD1 Directionally drill f/ 10270' to 10291'. Continual erratic drilling. Suspect some bit damage from 23. Also, 22 has been very conglomeritic. 02:30 - 03:45 1.25 DRILL P PROD1 POOH to check bit. Also, need to crank down motor to 2.1. Flag pipe at 9800' EOP. Slow for TT - nothing seen. 03:45 - 04:45 1.00 DRILL P PROD1 Set back injector. LID BHA #6. Change out motor for 2.1 deg, directional/gamma package. Bit wear pattern similar to first BC bit. 04:45 - 06:20 1.58 DRILL P PROD1 RIH with BHA #7. Correct depth at flag (-44'). 06:20 - 06:30 0.17 DRILL P PROD1 Log tie-in. No correction. Printed: 4/2/2003 11 :30:41 AM ) ') BP EXPLORATION Operations Summary Report Page 4 of 7 Legal Well Name: F-04 Common Well Name: F -04a Spud Date: 2/1/1971 Event Name: REENTER+COMPLETE Start: 2/18/2003 End: 3/3/2003 Contractor Name: NORDIC CALISTA Rig Release: 3/3/2003 Rig Name: NORDIC 2 Rig Number: N2 From - To Hours Task Code NPT Phase Description of Operations 2/24/2003 06:30 - 06:45 0.25 DRILL P PROD1 RIH. lAP = 600 psi; OAP = 650 psi. 06:45 -10:15 3.50 DRILL P PROD1 Drill about 25 - 30 FPH to 10369'. This 2.1 deg motor is only giving DL's of about 27 deg/100, which will cause us to land 15' -18' deep; need about 32 deg/1 00 to land on target. 10:15 - 10:30 0.25 DRILL P PROD1 Ream tight area 10250'. 10:30 - 12:00 1.50 DRILL P PROD1 POOH. 12:00 - 12:30 0.50 DRILL P PROD1 Dial motor to 2.8 deg. Bit OK to rerun, just one chipped cutter on nose. 12:30 - 14:10 1.67 DRILL P PROD1 RIH with BHA #8. Correct depth at flag (-41'). 14:10 - 14:15 0.08 DRILL P PROD1 Log tie-in. No correction. 14:15 - 14:30 0.25 DRILL P PROD1 RIH to TD. 14:30 - 20:05 5.58 DRILL P PROD1 Drill f/ 10369' to 10518'. ROP picked up to 60 FPH starting about 10394'. Hit tough spot starting about 10450' (could be 14N shale?). 20:05 - 20:35 0.50 DRILL P PROD1 Wiper trip to 10030' 20:35 - 21 :50 1.25 DRILL P PROD1 Drill f/ 10518' to 10550'md 8974' tvd 1.82 bpm in/out 3k wob 21 :50 - 23:40 1.83 DRILL P PROD1 TOH for lateral BHA open EDC. Slow for TT - no problem. 130'/min 1.9 in / 1.46 out 23:40 - 00:00 0.33 DRILL P PROD1 Dial down AKO motor to 1.1 deg bend. Bit looked fine. 2/25/2003 00:00 - 00:10 0.17 DRILL P PROD1 Stab on injector. 00:10-01:55 1.75 DRILL P PROD1 RIH to flag @ 100'/min . Correct -40'. RIH to 9830' bit depth. 01 :55 - 02:00 0.08 DRILL P PROD1 Log tie-in -2' correction. 02:00 - 02:15 0.25 DRILL P PROD1 RIH to bottom. No problems with 1.1 motor 02: 15 - 04:25 2.17 DRILL P PROD1 Directionally drill ahead f/ 10550' to 10689' 1.84 in/out 3480 free-spin 3-400 psi motor work 2-3k wob 50-60'/hr. Start mud swap. Landed out at 10552'md Start stacking weight. 04:25 - 05:05 0.67 DRILL P PROD1 Wiper trip window. 05:05 - 07:00 1.92 DRILL P PROD1 Drill to 10865'; 8970' SSTVD. Still trying to nose it down to revised landing point of 8975'. Unusually small DL's with this 1.1 motor -- only averaging 5's. 07:00 - 07:45 0.75 DRILL P PROD1 Wiper to window 1.8/3250 07:45 - 08:20 0.58 DRILL P PROD1 Drill to 10882'. Need a higher bend motor to get to our target TVD quicker. 08:20 - 10:00 1.67 DRILL P PROD1 POOH for higher angle motor. 10:00 - 10:45 0.75 DRILL P PROD1 At surface. Check bit (ok). Increase motor angle to 1.5 deg. Get back on well. 10:45 - 12:30 1.75 DRILL P PROD1 RIH with BHA #10 12:30 - 12:45 0.25 DRILL P PROD1 Correct to EOP flag (-41.4') Log gr tie in. Subtract l' correction. 12:45 - 13:00 0.25 DRILL P PROD1 Continue in hole. Window smooth. Tag TD at 10883'. 13:00 - 16:45 3.75 DRILL P PROD1 Drill ahead. 3450 psi @ 1.8 bpm. 300 psi DP. 1: 1 rtns. 2.5K# WOB. ROP:20-30 fph. Drill to 10987'. Still in high gr shale. 16:45 - 17:45 1.00 DRILL P PROD1 Wiper trip to window. Discuss steering/directional options with town. Hole smooth. 17:45 - 22:45 5.00 DRILL P PROD1 Drill ahead at 88R TF f/ 10990'. Order extra Klagard after drilling high gr shale bring up to +/- 8ppb. Very slow ROP in this shale <1 O'/hr. Try different TF, slow pump rate, low wob nothing makes a difference. At 11005' decide to dive down in structure. TF now at 135R. ROP picked up 20'/hr at 11015' - 11064' still drilling shale. 22:45 - 23:25 0.67 DRILL P PROD1 Wiper trip to window. 23:25 - 00:00 0.58 DRILL P PROD1 Drill ahead. ROP increasing at 11 080'md 8990'sstvd. 2-3k wob rop > 70-80'/hr. Drill to 11095'. (shale) Printed: 4/2/2003 1130:41 AM ) ) Operations Summary Report Legal Well Name: F-04 Common Well Name: F-04a Event Name: REENTER+COMPLETE Contractor Name: NORDIC CALISTA Rig Name: NORDIC 2 From - To Hours Task Code NPT 2/26/2003 00:00 - 02:20 2.33 DRILL P 02:20 - 02:55 0.58 DRILL P 02:55 - 03:25 0.50 DRILL P 03:25 - 06:00 2.58 DRILL C 06:00 - 07:30 1.50 DRILL C 07:30 - 07:45 0.25 STKOH C 07:45 - 08:30 0.75 STKOH C 08:30 - 10:00 1.50 STKOH C 10:00 - 10:30 0.50 STKOH C 10:30 - 12:30 2.00 STKOH C 12:30 - 13:45 1.25 STKOH C 13:45 - 15:30 1.75 STKOH C 15:30 - 16:00 0.50 STKOH C 16:00 - 16:30 0.50 STKOH C 16:30 - 19:25 2.92 STKOH C 19:25 - 21 :20 1.92 STKOH C 21 :20 - 21 :45 0.42 STKOH C 21 :45 - 21 :55 0.17 DRILL C 21 :55 - 00:00 2.08 BOPSURC 2/27/2003 00:00 - 02:30 2.50 BOPSUR C 02:30 - 02:35 0.08 DRILL C 02:35 - 03:00 0.42 DRILL C 03:00 - 04:45 1.75 DRILL C 04:45 - 05:00 0.25 DRILL C 05:00 - 05:20 0.33 DRILL C 05:20 - 09:00 3.67 DRILL C 09:00 - 09:15 0.25 DRILL C 09:15 -10:30 1.25 DRILL C 10:30 - 11 :30 1.00 DRILL C 11 :30 - 15:30 4.00 DRILL C 15:30 - 16:30 16:30 - 21 :00 1.00 DRILL C 4.50 DRILL C Phase PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Start: 2/18/2003 Rig Release: 3/3/2003 Rig Number: N2 Spud Date: 2/1/1971 End: 3/3/2003 Description of Operations Drill f/ 11095' to 11226'. Increasing rop dropping back into double digit API #'s. Inc 86+ 1.8 in/out 2-3k wob 100'+/hr Wiper trip to window. PUH to 9800'. Start to log then cancel. Town has decided to come uphole to +/- 10800' and sidetrack. TOH. Review options: open hole sidetrack or run Weatherford open hole whipstock. Moblilize Weatherford. Hold PJSM discuss I/d BHA and sidetrack plans. Standby for Weatherford aluminum billet equipment. Hold PJSM before MU BHA assembly. Check e-line. MU tools. RIH with EDC open Correct to flag (-39'). Continue into open hole circulating at 0.3 bpm. Verify tie in with GR log. Ran smooth through entire OH, even at 50 deg d-Iegs. Close EDC. Pressure up setting to 4000 psi. PU and shear off same. Top of WS set at 10783'. POOH with setting tool. Get off well. LD setting tool. MU kick off BHA (M-09 with 1.7 deg mtr). Get on well. RIH. Log gr tie in from 9830'. Subtract 6' correction. RIH. Tag billet/whipstock at 10783'. Begin time milling at 1'/hr. 3350 psi@1.76 bpm. No mtr work or WOB. Drill off and continue drilling with high right TF to 1 0820'. TOH BOP test due today. Notified AOGCC of test. Witnessing wavied by rep. John Crisp. Set back injector. LID BHA #11 PJSM for testing BOPE. Pressure test upper & lower pipe/slip rams, blinds, inner/outer stack & HCR valves. 250psi low, 3500psi high. Continue testing BOPE, check bottle pre-charge pressures and drawdown test on accumulator, test SLB inner reel valve. PJSM picking up BHA #12 P/U BHA and stab on injector TIH. EDC open Log tie-in +4'. RIH to 10820'. Directionally drill f/ 10820' 1.8 in/out 2-3k wob 3400FS 3-400 psi motor work. Drill to 10917'. Short wiper trip. Drilling ahead. 3800 psi@ 1.8 bpm. 3550 psi fs. 1:1 rtns. WOB: 2.5K# ROP: 30-70 fph. Drill to 10970'. Wiper trip to window. Hole smooth. Drilling ahead. Drill to 11060'. Weight transfer becoming a problem. Pump 40 bbl pill of new mud. Some improvement. Able to drill. In high gr shale. Add 4 drums lubtex (1 %). Drill to 11085'. Wiper trip to window. Hole very smooth. Drill ahead. Able to get 2K# WOB with 5K# stacked on coil. ROP <1 O'/hr f/11140'. Make several small wiper trips. Drilling in shale. FS 3550 psi. 200 psi motor work. Confer with town Printed: 4/2/2003 11: 30:41 AM ) ) BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-04 F -04a REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 2/18/2003 Rig Release: 3/3/2003 Rig Number: N2 Spud Date: 2/1/1971 End: 3/3/2003 Date From - To Hours Task Code NPT Phase Description of Operations 2/27/2003 16:30 - 21 :00 4.50 DRILL C PROD1 about slow shale drilling. Decide to end drilling at 11210'. 21 :00 - 21 :50 0.83 DRILL P PROD1 Wiper trip up to window. OOH to 9820'. 21 :50 - 22:05 0.25 DRILL P PROD1 Log tie-in. -1' correction. 22:05 - 22:45 0.67 DRILL P PROD1 Wiper to bottom. Tagged at 11206' TD motor work seen at 10105', 10155', 10280', 10518', 10920', 10982', 11139' 22:45 - 00:00 1.25 DRILL P PROD1 Wiper back to window then down. Looks good. 2/28/2003 00:00 - 00:45 0.75 DRILL P PROD1 TOH lay-in 120K LSRV Flo-Pro from TD to window. 00:45 - 02:25 1.67 DRILL P PROD1 TOH flag coil EOP at 8400'. Open EDC 02:25 - 03:25 1.00 DRILL P PROD1 Stab off well. R/U and freeze protect e-line coil. Same time LID BHA #12. 03:25 - 03:35 0.17 DRILL PROD1 PJSM review unstabbing procedures. 03:25 - 04: 15 0.83 DRILL P PROD1 Prep e-line coil at drill floor to unstab and secure to reel. 04: 15 - 06:00 1.75 DRILL P PROD1 Unstab, spool back and secure reel. 06:00 - 06:45 0.75 DRILL P PROD1 Hold extensive PJSM to discuss sim ops of running liner and changing reels. 06:45 - 13:30 6.75 CASE P CaMP RU to run 86 jts 2-3/8", 4.6#, L-80 STL liner. Drift each connection with 1.89" drift. Begin reel swap from e-line to plain coil (2"). Completed reel swap by 1 0:00 am. 13:30 - 14:30 1.00 CASE P CaMP MU liner running tool assembly. Set in 2-3/8" slips wI TIW valve. 14:30 - 15:00 0.50 CASE P CaMP Hold extensive PJSM for coil stabbing procedure. 15:00 - 16:00 1.00 CASE P CaMP Stab coil into injector using tugger system. 16:00 - 17:00 1.00 CASE P CaMP Displace meoh from coil. 17:00 - 18:50 1.83 CASE P CaMP Weld on 2" SLB connector (verify id: 1.09"). Pull test 25k PT to 4k. Load and pump dart 40.1 bbls 18:50 - 19:00 0.17 CASE P CaMP PJSM stabbing on well. 19:00 - 21 :20 2.33 CASE P CaMP Stab on liner. Fill liner w/5 bbls RIH min rate 1 OO'/min to 9800'. Check wts. up 27k. Correct -41' depth. RIH tagged and work through at 10920'. Tagged again at 11040' little harder working through this one. 21 :20 - 21 :50 0.50 CASE P CaMP Working pipe to bottom. 21 :50 - 22:35 0.75 CASE P CaMP Load and pump .625" steel ball pump 30.8 bbls ball on seat. Sheared at 4211 psi. Pick-up 19k confirm release. Set down 10k. 22:35 - 00:00 1.42 CASE P CaMP Swap well to 2% KCL. Flo-Pro going to Nordic #1. 3/1/2003 00:00 - 00: 15 0.25 CEMT P CaMP PJSM discuss cementing procedures and job assignments. 00: 15 - 02:00 1.75 CEMT P CaMP Batch mix cement. Pump 5 bbls water ahead PT lines to 4k. Pump 10 bbls of 15.8ppg cement. Shutdown flush lines back to vac-truck. Load CT wiper dart. Pump dart away and verify. Displace with 30 bbl Bio remainder KCL. Full returns. Darts landed on time and held. CIP @ 01 :55 hrs. 02:00 - 03:35 1.58 CLEAN P CaMP Pressure up to 500 psi on liner and sting out. Lay-in 20 bbl bio 1 :1. TOH no cement to surface seen. (not expected) 03:35 - 04:00 0.42 CLEAN P COMP Close Master valve. Setback injector. LID CTLRT. 04:00 - 04: 1 0 0.17 CLEAN P COMP PJSM picking up 1" hydril BHA 04:10 - 08:00 3.83 CLEAN P COMP P/U cleanout motor and 94 jts. 1" CS hydril. 08:00 - 08:30 0.50 CLEAN P COMP MU rest of BHA. Stab on well. 08:30 - 11 :45 3.25 CLEAN P COMP RIH wI 1-11/16" motor & 1.8 speed mill. Ran to 11153' and tagged up. Mill for 15 minutes no drill off. No apparent cement fill. 11 :45 - 13:00 1.25 CLEAN P CaMP POOH with clean out assembly. Hold PJSM before getting to surface. 13:00-14:30 1.50 CLEAN P COMP Stand back CHS in derrick. Printed: 4/2/2003 11 :30:41 AM ) ) BP Operati.ons Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-04 F-04a REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 2/18/2003 Rig Release: 3/3/2003 Rig Number: N2 Spud Date: 2/1/1971 End: 3/3/2003 Date From - To Hours Task Code NPT Phase Description of Operations 3/1/2003 14:30 -15:00 0.50 CLEAN P COMP LD mill & motor. 15:00 -15:15 0.25 EVAL P COMP Hold PJSM before MU logging tools & BHA. 15:15 - 15:45 0.50 EVAL P COMP MU CNLlCCLlGR tools. 15:45 - 18:55 3.17 EVAL P COMP RIH with 47 stands CSH out of derrick. 18:55 - 20:00 1.08 EVAL P COMP TIH w/ logging tools. 20:00 - 22:20 2.33 EVAL P COMP Start logging down f/ 8450' at 60'/min. Tagged at 11194'. Log up and lay-in clean Flo-Pro perf pill. 22:20 - 23:00 0.67 EVAL P COMP TOH to 1" CSH hydril pipe 23:00 - 00:00 1.00 EVAL P COMP Stand back CHS in derrick. 3/2/2003 00:00 - 01 :40 1.67 EVAL P COMP Continue stand back hydril pipe in derrick. 01:40 - 02:15 0.58 EVAL P COMP LID CNL tools. 02:15 - 04:15 2.00 EVAL P COMP Process log and fax to town. WO perf orders. Found top of liner at 8483'md. PBTD is 11157'. Same time PT liner lap to 2000 psi for 30 min. 30 psi leak-off. Test good. 04:15 - 06:00 1.75 PERF P COMP Call out and load guns in pipe shed. 06:00 - 06: 15 0.25 PERF P COMP Hold PJSM before MU perf guns. 06: 15 - 07:30 1.25 PERF P COMP MU 493' 1-11/16" HSD PJ1606 4 spf guns (23 guns). 07:30 - 09:30 2.00 PERF P COMP Run guns on 74 jts of 1" CSH. Check each connection while rng stands. None found loose. Make up to coil. Stab on well. 09:30 - 11 :30 2.00 PERF P COMP RIH with perf guns. Tag PBTD and correct to CNLlGR logged depth of 11157'. PU to btm shot depth of 11020'. 11:30-12:30 1.00 PERF P COMP Pump 5 bbls flo pro and drop 0.5" steel ball. Circulate to firing head. Surge pump to get ball on seat. On seat at 43 bbls. Start moving guns slowly up hole. Guns fired at 3000 psi. Perf intervals: 10540-10610, 10700-10850, 10930-11020. with 1.56" HSD PJ 1606,4 spf guns. 12:30 - 15:15 2.75 PERF P COMP POOH filling from top. Pull 40 fpm in liner to reduce chance of swabbing. 15:15 - 16:45 1.50 PERF P COMP Get off well. Stand back CSH. 16:45 - 18:30 1.75 PERF P COMP LD perf guns. All shots fired. 18:30 - 19:45 1.25 DEMOB P COMP P/U nozzle RIH to 2000' and FP well with 18 bbls methanol. 19:45 - 21 :45 2.00 DEMOB P COMP FP 2" coil. Prep to unstab coil from injector. Clean mud tanks. 21:45 - 22:00 0.25 DEMOB P COMP PJSM review procedures for unstabbing and respooling coil. 22:00 - 00:00 2.00 DEMOB P COMP Unstab and secure 2" coil to reel. 3/3/2003 00:00 - 01 :00 1.00 DEMOB P COMP Secure coil to reel and prep to drop out of reel house. 01 :00 - 03:00 2.00 RIGD P POST Nipple down BOPE. Install tree cap and test to 4k. Lower reel to truck. Will move w/o reel to Kuparuk Rig Released at 0300 hrs 3-03-2003 Printed: 4/2/2003 11 :30:41 AM ,.',. ~ta ) ) B.P. EXPLORATION ~O~·-'/OO F PAD, WELL NO. F-04A PRUDHOE BAY FIELD, ALASKA Gyro Multishot Inside 4.5/3.5/2.675" Csg. Survey date: 4/2/02 Job number :AK0402GCE510 5. EQUIPMENT AND CHRONOLOGICAL REPORT 4. QUALITY CONTROL 3. OUTRUN SURVEY LISTING 2. SURVEY DETAILS 1. DISCUSSION, SURVEY CERTIFICATION SHEET CONTENTS JOB NUMBER :AK0402GCE510 ') ) ~ta gyrofdata :') 1. DISCUSSION. SURVEY CERTIFICATION SHEET ~ta '.) ) DISCUSSION JOB NUMBER: AK0402GCE510 Tool 811 was run in F-04 on Wireline. The survey was run without any problems. gyrq'data ) ') SURVEY CERTIFICATION SHEET JOB NUMBER: AK0402GCE510 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- WALTER KILEY OPERATIONS MANAGER ~data ) ) 2. SURVEY DETAILS gyrofdata CLIENT: RIG: LOCATION : WELL: LATITUDE: LONGITUDE: SURVEY DATE: SURVEY TYPE : API NUMBER: DEPTH REFERENCE: MAX. SURVEY DEPTH: SURVEY INTERVAL: CALCULATION METHOD: SURVEYOR: ') ) SURVEY DETAILS JOB NUMBER: AK0402GCE510 B.P. EXPLORATION FPAD PRUDHOE BAY, AK F-04 70.3360 N 148.9000 E 4-2-02 CONTINUOUS 50-029-2008900 ROTARY TABLE ELEVATION 10300.0 OVERLAP 0.0 MINIMUM CURVATURE TOM STODDARD gyrodata ) 3. OUTRUN SURVEY A Gyrodata Directional Survey for B.P. Location: F PAD, PRUDHOE BAY, AK '-/ Well: F-04, 4.5"/3.5"/2.875" Job Number: AK0402GCE510 Run Date: 4/2/02 9:20: 11 AM Surveyor: Tom Stoddard Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.336000 deg. N Survey Longitude: 148.900000 deg. E Sub-sea Correction from Vertical Reference: 57.07 ft. Azimuth Correction: Gyro: Bearings are Relative to True North '~- Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BA Y, AK Job Number: AK0402GCE510 MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet feet feet deg. feet 100 ft. 0.0 0.00 0.00 0.00 0.0 -57.1 0.0 0.0 0.0 0.00 N 0.00 E 100.0 0.66 190.40 0.66 100.0 42.9 -0.6 0.6 190.4 0.56 S 0.10W 200.0 0.87 180.54 0.25 200.0 142.9 -1.9 1.9 186.5 1.89 S 0.21 W -' 300.0 1.38 176.73 0.51 300.0 242.9 -3.9 3.9 182.3 3.85 S 0.15W 400.0 1.83 172.82 0.47 399.9 342.9 -6.6 6.6 179.0 6.64 S 0.12 E 500.0 2.40 168.44 0.59 499.9 442.8 -10.3 10.3 175.9 10.27 S 0.73 E 600.0 2.60 166.57 0.22 599.8 542.7 -14.5 14.6 173.4 14.53 S 1.68 E 700.0 2.42 164.93 0.19 699.7 642.6 -18.8 19.0 171.6 18.78 S 2.76 E 800.0 1.75 163.31 0.67 799.6 742.5 -22.3 22.6 170.5 22.28 S 3.75 E 900.0 1.33 160.07 0.44 899.6 842.5 -24.8 25.3 169.6 24.83 S 4.58 E 1000.0 0.97 157.54 0.36 999.5 942.5 -26.7 27.2 168.8 26.70 S 5.29 E 1100.0 0.70 155.19 0.26 1099.5 1042.5 -28.0 28.6 168.2 28.04 S 5.87 E 1200.0 0.54 153.97 0.16 1199.5 1142.5 -29.0 29.7 167.7 29.02 S 6.34 E 1300.0 0.46 159.18 0.09 1299.5 1242.5 -29.8 30.6 167.4 29.82 S 6.69 E 1400.0 0.25 154.80 0.21 1399.5 1342.5 -30.4 31.2 167.2 30.39 S 6.93 E 1500.0 0.31 177.09 0.12 1499.5 1442.5 -30.9 31.6 167.2 30.86 S 7.03 E 1600.0 0.32 185.48 0.05 1599.5 1542.5 -31.4 32.2 167.4 31.40 S 7.02 E '---, 1700.0 0.31 188.37 0.02 1699.5 1642.5 -31.9 32.7 167.7 31.94 S 6.95 E 1800.0 0.31 192.01 0.02 1799.5 1742.4 -32.5 33.2 168.1 32.48 S 6.86 E 1900.0 0.25 201.33 0.08 1899.5 1842.4 -33.0 33.6 168.5 32.95 S 6.72 E 2000.0 0.25 230.64 0.13 1999.5 1942.4 -33.3 33.9 169.0 33.30 S 6.47 E 2100.0 0.16 220.72 0.09 2099.5 2042.4 -33.5 34.1 169.5 33.54 S 6.21 E 2200.0 0.10 206.91 0.06 2199.5 2142.4 -33.7 34.3 169.8 33.73 S 6.08 E 2300.0 0.11 163.25 0.08 2299.5 2242.4 -33.9 34.4 169.9 33.90 S 6.06 E 2400.0 0.46 49.30 0.51 2399.5 2342.4 -33.7 34.3 169.3 33.73 S 6.39 E 2 A Gyrodata Directional Survey B.P. Well: F-04,4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE510 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG SEVERITY deg./ 100 ft. VERTICAL DEPTH feet SUBSEA DEPTH feet VERTICAL CLOSURE SECTION DIST. AZIMUTH feet feet deg. HORIZONTAL COORDINATES feet 2500.0 3.36 65.76 2.92 2499.4 2442.4 -32.3 33.6 163.8 32.26 S 9.37 E 2600.0 4.96 83.96 2.05 2599.2 2542.1 -30.6 34.7 151.9 30.61 S 16.33 E ---- 2700.0 5.26 84.11 0.30 2698.8 2641. 7 -29.7 38.9 139.7 29.68 S 25.18 E 2800.0 7.14 63.43 2.89 2798.2 2741.1 -26.4 44.1 126.8 26.43 S 35.30 E 2900.0 9.31 56.83 2.36 2897.2 2840.1 -19.2 51.4 112.0 19.23 S 47.63 E 3000.0 11.01 61.66 1.91 2995.6 2938.5 -10.3 63.6 99.3 10.27 S 62.80 E 3050.0 12.26 63.08 2.56 3044.6 2987.5 -5.6 72.0 94.5 5.60 S 71.74 E 3100.0 13.98 64.46 3.49 3093.3 3036.2 -0.6 81.9 90.4 0.59 S 81. 92 E 3150.0 15.91 66.58 4.01 3141.6 3084.5 4.7 93.8 87.1 4.74 N 93.66 E 3200.0 17.43 68.84 3.31 3189.5 3132.4 10.2 107.4 84.6 10.16 N 106.93 E 3250.0 18.82 70.82 3.05 3237.0 3179.9 15.5 122.5 82.7 15.52 N 121.53 E 3300.0 19.83 71.95 2.15 3284.2 3227.1 20.8 138.8 81.4 20.79 N 137.21 E 3350.0 20.98 72.70 2.36 3331.0 3274.0 26.1 156.0 80.4 26.08 N 153.82 E 3400.0 22.4 7 73.4 7 3.04 3377.5 3320.4 31.5 174.4 79.6 31.46 N 171.52 E 3450.0 24.13 73.93 3.35 3423.4 3366.3 37.0 194.1 79.0 37.01 N 190.50 E 3500.0 25.75 74.65 3.28 3468.8 3411. 7 42.7 215.1 78.5 42.72 N 210.80 E '~ 3550.0 27.1 0 75.31 2.77 3513.5 3456.5 48.5 237.3 78.2 48.48 N 232.29 E 3600.0 29.22 76.20 4.33 3557.6 3500.5 54.3 260.9 78.0 54.28 N 255.16 E 3650.0 31.47 76.33 4.51 3600.8 3543.7 60.3 286.1 77.8 60.28 N 279.69 E 3700.0 34.26 76.21 5.57 3642.7 3585.7 66.7 313.2 77.7 66.72 N 306.05 E 3750.0 36.55 76.19 4.59 3683.5 3626.4 73.6 342.2 77.6 73.63 N 334.17 E 3800.0 38.18 76.31 3.27 3723.2 3666.2 80.8 372.5 77.5 80.84 N 363.65 E 3850.0 38.95 76.25 1.53 3762.3 3705.3 88.2 403.7 77.4 88.23 N 393.93 E 3900.0 39.18 76.29 0.47 3801.2 3744.1 95.7 435.2 77.3 95.71 N 424.54 E 3 A Gyrodata Directional Survey B.P. Well: F-04,4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE510 MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg.l feet feet feet feet deg. feet 100 ft. 3950.0 39.23 76.45 0.23 3839.9 3782.8 103.2 466.8 77.2 103.16 N 455.25 E 4000.0 39.36 76.39 0.26 3878.6 3821.5 110.6 498.5 77.2 110.59 N 486.04 E ~ 4050.0 39.33 76.38 0.07 3917.3 3860.2 118.1 530.2 77.1 118.05 N 516.84 E 4100.0 39.12 76.40 0.42 3956.0 3898.9 125.5 561.8 77.1 125.49 N 547.57 E 4150.0 39.04 76.4 7 0.18 3994.8 3937.7 132.9 593.3 77.1 132.89 N 578.21 E 4200.0 39.06 76.56 0.12 4033.6 3976.6 140.2 624.8 77.0 140.23 N 608.84 E 4250.0 39.35 76.55 0.58 4072.4 4015.3 147.6 656.4 77.0 147.58 N 639.58 E 4300.0 39.24 76.56 0.22 4111.1 4054.0 154.9 688.0 77.0 154.94 N 670.37 E 4350.0 38.95 76.69 0.59 4149.9 4092.8 162.2 719.6 77.0 162.24 N 701.05 E 4400.0 39.20 76.71 0.50 4188.7 4131.6 169.5 751.1 77.0 169.49 N 731.72 E 4450.0 39.14 76.78 0.15 4227.5 4170.4 176.7 782.7 77.0 176.73 N 762.47 E 4500.0 39.38 76.75 0.47 4266.2 4209.1 184.0 814.3 76.9 183.97 N 793.27 E 4550.0 38.91 76.89 0.94 4305.0 4247.9 191.2 845.9 76.9 191.17 N 824.00 E 4600.0 39.13 76.82 0.44 4343.8 4286.7 198.3 877.4 76.9 198.33 N 854.66 E 4650.0 39.22 76.84 0.17 4382.6 4325.5 205.5 909.0 76.9 205.52 N 885.41 E 4700.0 38.95 76.91 0.53 4421.4 4364.3 212.7 940.5 76.9 212.68 N 916.11 E "- ~ 4750.0 39.06 77.03 0.26 4460.2 4403.2 219.8 971.9 76.9 219.78 N 946.77 E 4800.0 39.06 77.12 0.11 4499.1 4442.0 226.8 1003.5 76.9 226.83 N 977.48 E 4850.0 39.05 77.08 0.05 4537.9 4480.8 233.9 1035.0 76.9 233.86 N 1008.18 E 4900.0 39.07 77.21 0.17 4576.7 4519.6 240.9 1066.5 76.9 240.87 N 1038.90 E 4950.0 39.15 . 77.22 0.16 4615.5 4558.4 247.8 1098.0 77.0 247.85 N 1069.66 E 5000.0 39.23 77.41 0.29 4654.3 4597.2 254.8 1129.6 77.0 254.79 N 11 00.48 E 5050.0 39.17 77.35 0.14 4693.0 4635.9 261.7 1161.2 77.0 261.69 N 1131.32 E 5100.0 39.14 77.33 0.08 4731.8 4674.7 268.6 1192.8 77.0 268.61 N 1162.12 E 4 A Gyrodata Directional Survey B.P. Well: F-04,4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE510 MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet feet feet deg. feet 100 ft. 5150.0 39.09 77.34 0.09 4770.6 4713.5 275.5 1224.3 77.0 275.52 N 1192.90 E 5200.0 39.03 77.38 0.12 4809.4 4752.3 282.4 1255.8 77.0 282.42 N 1223.64 E ~ 5250.0 39.14 77.46 0.24 4848.2 4791.1 289.3 1287.3 77.0 289.29 N 1254.41 E 5300.0 39.14 77.41 0.06 4887.0 4829.9 296.2 1318.9 77.0 296.15 N 1285.22 E 5350.0 39.04 77.30 0.24 4925.8 4868.7 303.1 1350.4 77.0 303.05 N 1315.98 E 5400.0 39.16 77.32 0.25 4964.6 4907.5 310.0 1382.0 77.0 309.98 N 1346.75 E 5450.0 38.99 77.39 0.35 5003.4 4946.3 316.9 1413.5 77.0 316.88 N 1377.50 E 5500.0 39.32 77.54 0.67 5042.2 4985.1 323.7 1445.0 77.1 323.73 N 1408.32 E 5550.0 39.16 77.53 0.30 5080.9 5023.8 330.6 1476.7 77.1 330.56 N 1439.20 E 5600.0 39.32 77.44 0.34 5119.6 5062.6 337.4 1508.3 77.1 337.41 N 1470.08 E 5650.0 38.97 77.45 0.71 5158.4 5101.3 344.3 1539.9 77.1 344.28 N 1500.89 E 5700.0 39.02 77.53 0.15 5197.3 5140.2 351.1 1571.3 77.1 351.09 N 1531.61 E 5750.0 39.20 77.53 0.37 5236.1 5179.0 357.9 1602.9 77.1 357.90 N 1562.40 E 5800.0 38.99 77.50 0.42 5274.9 5217.8 364.7 1634.4 77.1 364.72 N 1593.19 E 5850.0 39.26 77.65 0.57 5313 .6 5256.6 371.5 1666.0 77.1 371.51 N 1624.00 E 5900.0 39.24 77.42 0.29 5352.4 5295.3 378.3 1697.6 77.1 378.33 N 1654.90 E 5950.0 39.22 77.46 0.06 5391.1 5334.0 385.2 1729.2 77.1 385.21 N 1685.77 E '----- 6000.0 39.21 77.61 0.19 5429.8 5372.8 392.0 1760.8 77.1 392.03 N 1716.63 E 6050.0 39.01 77.65 0.40 5468.6 5411.6 398.8 1792.4 77.1 398.79 N 1747.44 E 6100.0 39.24 77.68 0.47 5507.4 5450.4 405.5 1823.9 77.2 405.53 N 1778.26 E 6150.0 39.00 77.71 0.48 5546.2 5489.1 412.3 1855.5 77.2 412.26 N 1809.08 E 6200.0 39.22 77.63 0.45 5585.0 5527.9 419.0 1887.0 77.2 418.99 N 1839.90 E 6250.0 39.11 77.62 0.22 5623.8 5566.7 425.8 1918.6 77.2 425.76 N 1870.75 E 6300.0 38.88 77.49 0.50 5662.6 5605.6 432.5 1950.0 77.2 432.54 N 1901.47 E 5 A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.87511 Location: F PAD, PRUDHOE BAY, AI< Job Number: AK0402GCE5l0 MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet feet feet deg. feet 100 ft. 6350.0 39.02 77.42 0.31 5701.5 5644 .4 439.4 1981.5 77.2 439.37 N 1932.15 E 6400.0 38.95 77.43 0.15 5740.4 5683.3 446.2 2012.9 77.2 446.22 N 1962.85 E 6450.0 38.87 77.58 0.24 5779.3 5722.2 453.0 2044.3 77.2 453.01 N 1993.52 E ~ 6500.0 39.26 77.51 0.78 5818.1 5761.0 459.8 2075.8 77.2 459.81 N 2024.28 E 6550.0 39.44 77.57 0.37 5856.8 5799.7 466.6 2107.6 77.2 466.65 N 2055.24 E 6600.0 39.20 77.58 0.47 5895.5 5838.4 473.5 2139.2 77.2 473.47 N 2086.18 E 6650.0 39.09 77.69 0.26 5934.2 5877.2 480.2 2170.8 77.2 480.22 N 2117.01 E 6700.0 39.61 77.55 1.04 5972.9 5915.8 487.0 2202.5 77.2 487.02 N 2147.98 E 6750.0 39.18 77.63 0.86 6011.5 5954.5 493.8 2234.2 77.2 493.84 N 2178.97 E 6800.0 39.16 77.49 0.18 6050.3 5993.2 500.6 2265.8 77.2 500.64 N 2209.81 E 6850.0 39.34 77.48 0.37 6089.0 6031.9 507.5 2297.4 77.2 507.50 N 2240.69 E 6900.0 39.09 77.71 0.58 6127.8 6070.7 514.3 2329.1 77.2 514.29 N 2271.57 E 6950.0 39.31 77.65 0.44 6166.5 6109.4 521.0 2360.7 77.2 521.03 N 2302.44 E 7000.0 38.98 77.75 0.67 6205.3 6148.2 527.8 2392.2 77.3 527.75 N 2333.28 E 7050.0 38.95 78.01 0.33 6244.2 6187.1 534.4 2423.7 77.3 534.35 N 2364.02 E 7100.0 39.18 78.12 0.47 6283.0 6225.9 540.9 2455.2 77.3 540.87 N 2394.84 E 7150.0 38.98 78.27 0.44 6321.8 6264.7 547.3 2486.7 77.3 547.32 N 2425.70 E ~ 7200.0 39.24 78.33 0.53 6360.6 6303.5 553.7 2518.2 77.3 553.72 N 2456.58 E 7250.0 39.02 78.38 0.46 6399.4 6342.3 560.1 2549.8 77.3 560.09 N 2487.49 E 7300.0 38.40 78.25 1.24 6438.4 6381.3 566.4 2581.0 77.3 566.42 N 2518.11 E 7350.0 38.23 78.23 0.35 6477.6 6420.6 572.7 2612.0 77.3 572.74 N 2548.46 E 7400.0 37.98 78.24 0.51 6517.0 6459.9 579.0 2642.9 77.3 579.03 N 2578.66 E 7450.0 37.89 78.37 0.23 6556.4 6499.3 585.3 2673.6 77.4 585.26 N 2608.76 E 7500.0 37.86 78.46 0.13 6595.9 6538.8 591.4 2704.3 77.4 591.42 N 2638.83 E 6 A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE510 fv1EASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg.l feet feet feet feet deg. feet 100 ft. 7550.0 37.53 78.52 0.67 6635.4 6578.4 597.5 2734.9 77.4 597.52 N 2668.79 E 7600.0 37.52 78.71 0.23 6675.1 6618.0 603.5 2765.3 77.4 603.53 N 2698.65 E '--, 7650.0 37.20 78.72 0.65 6714.8 6657.8 609.5 2795.6 77.4 609.47 N 2728.40 E 7700.0 37.15 79.04 0.41 6754.7 6697.6 615.3 2825.8 7704 615.30 N 2758.05 E 7750.0 36.79 78.98 0.72 6794.6 6737.6 621.0 2855.9 77.4 621.03 N 2787.57 E 7800.0 36.57 79.18 0.50 6834.7 6777.6 626.7 2885.8 77.5 626.69 N 2816.89 E 7850.0 36.41 79.31 0.35 6874.9 6817.8 632.2 2915.5 77.5 632.24 N 2846.11 E 7900.0 36.06 79.49 0.74 6915.2 6858.2 637.7 2945.0 77.5 637.68 N 2875.16 E 7950.0 36.22 79.46 0.31 6955.6 6898.6 643.1 2974.5 77.5 643.06 N 2904.15 E 8000.0 35.82 79.70 0.85 6996.1 6939.0 648.4 3003.9 77.5 648.38 N 2933.07 E 8050.0 35.87 79.96 0.33 7036.6 6979.5 653.6 3033.1 77.6 653.55 N 2961.89 E 8100.0 35.62 80.17 0.55 7077.2 7020.1 658.6 3062.3 77.6 658.59 N 2990.66 E 8150.0 35.40 80.73 0.78 7117.9 7060.8 663.4 3091.3 77.6 663.41 N 3019.30 E 8200.0 35.43 80.82 0.12 7158.6 7101.6 668.1 3120.3 77.6 668.06 N 3047.90 E 8250.0 35.02 81.17 0.91 7199.5 7142.4 672.6 3149.1 77.7 672.57 N 3076.39 E 8300.0 35.13 81.19 0.22 7240.4 7183.3 677.0 3177.7 77.7 676.98 N 3104.78 E 8350.0 34.70 81.34 0.88 7281.4 7224.3 681.3 3206.3 77.7 681.33 N 3133.07 E ~. 8400.0 34.56 81.53 0.37 7322.5 7265.5 685.6 3234.7 77.8 685.56 N 3161.17 E 8450.0 34.39 81.52 0.32 7363.7 7306.7 689.7 3262.9 77.8 689.73 N 3189.16 E 8500.0 33.92 81. 75 0.99 7405.1 7348.0 693.8 3290.9 77.8 693.81 N 3216.94 E 8550.0 33.68 82.27 0.75 7446.7 7389.6 697.7 3318.6 77.9 697.68 N 3244.48 E 8600.0 33.55 82.64 0.48 7488.3 7431.2 701.3 3346.2 77.9 701.31 N 3271.92 E 8650.0 33.67 83.03 0.48 7529.9 7472.9 704.8 3373.8 77.9 704.76 N 3299.38 E 8700.0 33.74 83.28 0.32 7571.5 7514.5 708.1 3401.4 78.0 708.07 N 3326.93 E 7 A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE510 MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg.l feet feet feet feet deg. feet 100 ft. 8750.0 34.10 83.67 0.84 7613.0 7556.0 711.2 3429.2 78.0 711.24 N 3354.65 E 8800.0 34.06 83.54 0.16 7654.4 7597.4 714.4 3457.1 78.1 714.36 N 3382.49 E ~' 8850.0 34.09 84.22 0.76 7695.9 7638.8 717.3 3485.0 78.1 717.35 N 3410.34 E 8900.0 34.22 84.77 0.67 7737.2 7680.2 720.0 3512.9 78.2 720.04 N 3438.29 E 8950.0 34.55 86.46 2.01 7778.5 7721.4 722.2 3540.9 78.2 722.20 N 3466.44 E 9000.0 34.63 88.03 1.79 7819.7 7762.6 723.6 3568.9 78.3 723.56 N 3494.79 E 9050.0 34.89 88.55 0.81 7860.7 7803.7 724.4 3597.0 78.4 724.41 N 3523.28 E 9100.0 35.10 90.41 2.16 7901.7 7844.6 724.7 3625.1 78.5 724.67 N 3551.95 E 9150.0 35.13 91.55 1.32 7942.6 7885.5 724.2 3653.2 78.6 724.18 N 3580.71 E 9200.0 35.39 92.20 0.91 7983.4 7926.4 723.2 3681.3 78.7 723.24 N 3609.56 E 9250.0 35.23 92.4 7 0.44 8024.2 7967.2 722.1 3709.4 78.8 722.06 N 3638.44 E 9300.0 34.75 92.73 1.02 8065.2 8008.1 720.8 3737.2 78.9 720.76 N 3667.08 E 9350.0 34.53 93.51 0.99 8106.3 8049.3 719.2 3764.8 79.0 719.21 N 3695.46 E 9400.0 35.76 94.14 2.55 8147.2 8090.1 717.3 3792.6 79.1 717.29 N 3724.18 E 9450.0 35.25 95.40 1.78 8187.9 8130.9 714.9 3820.6 79.2 714.88 N 3753.11 E 9500.0 35.21 96.98 1.82 8228.8 8171.7 711.8 3848.2 79.3 711.77 N 3781.79 E 97.47 0.56 8269.6 8212.6 708.1 3875.6 79.5 708.15 N 3810.38 E .~ 9550.0 35.19 9600.0 35.47 98.81 1.65 8310.4 8253.3 704.1 3903.0 79.6 704.05 N 3839.00 E 9650.0 35.52 100.11 1.51 8351.1 8294.1 699.3 3930.3 79.8 699.28 N 3867.63 E 9700.0 35.46 101.78 1.94 8391. 8 8334.8 693.8 3957.4 79.9 693.77 N 3896.13 E 9750.0 35.72 103.37 1.93 8432.5 8375.4 687.4 3984.3 80.1 687.43 N 3924.52 E 9800.0 35.51 104.00 0.84 8473.1 8416.1 680.5 4011.0 80.2 680.54 N 3952.82 E 9850.0 35.68 104.08 0.34 8513.8 8456.7 673.5 4037.6 80.4 673.48 N 3981.05 E 9900.0 35.39 104.22 0.60 8554.5 8497.4 666.4 4064.2 80.6 666.38 N 4009.23 E 9950.0 35.06 104.43 0.69 8595.3 8538.3 659.2 4090.6 80.7 659.24 N 4037.17 E 8 A Gyrodata Directional Survey B.P. Well: F-04, 4.511/3.511/2.87511 Location: F PAD, PRUDHOE BA Y, AK Job Number: AK0402GCE51 0 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG SEVERITY deg./ 100 ft. VERTICAL DEPTH feet SUBSEA DEPTH feet VERTICAL CLOSURE SECTION DIST. AZIMUTH feet feet deg. HORIZONTAL COORDINATES feet 10000.0 35.18 104.33 0.26 8636.2 8579.2 652.1 4117.0 80.9 652.10 N 4065.03 E ""':.~~J 10050.0 34.90 1 04.3 8 0.56 8677.2 8620.1 645.0 4143.4 81.0 644.98 N 4092.85 E 10100.0 34.57 104.36 0.66 8718.3 8661.2 637.9 4169.5 81.2 637.91 N 4120.44 E 10150.0 34.02 104.92 1.28 8759.6 8702.5 630.8 4195.4 81.4 630.80 N 4147.70 E 10200.0 33.92 104.76 0.26 8801.0 8744.0 623.6 4221.0 81.5 623.64 N 4174.71 E 10250.0 33.58 104.94 0.72 8842.6 8785.5 616.5 4246.6 81.7 616.52 N 4201.56 E 10300.0 33.43 104.95 0.31 8884.3 8827.2 609.4 4271.9 81.8 609.40 N 4228.23 E Final Station Closure: Distance: 4271.92 ft Az: 81.80 deg. .~-- 9 A Gyrodata Directional Survey for B.P. Location: F PAD, PRUDHOE BAY, AK ~ Well: F-04, 4.5"/3.5"/2.875" Job Number: AK0402GCE510SS Run Date: 4/2/02 9:20: 11 AM Surveyor: Tom Stoddard Calculation Method: MINIMUM CORV A TURE Survey Latitude: 70.336000 deg. N Survey Longitude: 148.900000 deg. E Sub-sea Correction from Vertical Reference: 57.07 ft. Azimuth Correction: Gyro: Bearings are Relative to True North ~ Vertical Section Calculated from Well Head Location Closure Calculated fÌ'om Well Head Location Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BA Y, AK Job Nwnber: AK0402GCE51 ass SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg.l feet feet feet deg. feet 100 ft. -57.1 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.00 N 0.00 E 42.9 0.66 190.40 0.66 100.0 -0.6 0.6 190.4 0.56 S 0.10W ~ 142.9 0.87 180.54 0.25 200.0 -1.9 1.9 186.5 1.89 S 0.21W 242.9 1.38 176.73 0.51 300.0 -3.9 3.9 182.3 3.85 S 0.15W 342.9 1.83 172.82 0.47 399.9 -6.6 6.6 179.0 6.64 S 0.12 E 442.8 2.40 168.44 0.59 499.9 -10.3 10.3 175.9 10.27 S 0.73 E 542.7 2.60 166.57 0.22 599.8 -14.5 14.6 173.4 14.53 S 1.68 E 642.6 2.42 164.93 0.19 699.7 -18.8 19.0 171.6 18.78 S 2.76 E 742.5 1.75 163.31 0.67 799.6 -22.3 22.6 170.5 22.28 S 3.75 E 842.5 1.33 160.07 0.44 899.6 -24.8 25.3 169.6 24.83 S 4.58 E 942.5 0.97 157.54 0.36 999.5 -26.7 27.2 168.8 26.70 S 5.29 E 1042.5 0.70 155.19 0.26 1099.5 -28.0 28.6 168.2 28.04 S 5.87 E 1142.5 0.54 153.97 0.16 1199.5 -29.0 29.7 167.7 29.02 S 6.34 E 1242.5 0.46 159.18 0.09 1299.5 -29.8 30.6 167.4 29.82 S 6.69 E 1342.5 0.25 154.80 0.21 1399.5 -30.4 31.2 167.2 30.39 S 6.93 E 1442.5 0.31 177.09 0.12 1499.5 -30.9 31.6 167.2 30.86 S 7.03 E ..~ 1542.5 0.32 185.48 0.05 1599.5 -31.4 32.2 167.4 31.40 S 7.02 E 1642.5 0.31 188.37 0.02 1699.5 -31.9 32.7 167.7 31. 94 S 6.95 E 1742.4 0.31 192.01 0.02 1799.5 -32.5 33.2 168.1 32.48 S 6.86 E 1842.4 0.25 201.33 0.08 1899.5 -33.0 33.6 168.5 32.95 S 6.72 E 1942.4 0.25 230.64 0.13 1999.5 -33.3 33.9 169.0 33.30 S 6.47 E 2042.4 0.16 220.72 0.09 2099.5 -33.5 34.1 169.5 33.54 S 6.21 E 2142.4 0.10 206.91 0.06 2199.5 -33.7 34.3 169.8 33.73 S 6.08 E 2242.4 0.11 163.25 0.08 2299.5 -33.9 34.4 169.9 33.90 S 6.06 E 2342.4 0.46 49.30 0.51 2399.5 -33.7 34.3 169.3 33.73 S 6.39 E 2 A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE51 OSS SUBSEA DEPTH feet INCL AZIMUTH deg. deg. DOGLEG SEVERITY deg.l 100 ft. VERTICAL VERTICAL DEPTH SECTION feet feet CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 2442.4 3.36 65.76 2.92 2499.4 -32.3 33.6 163.8 32.26 S 9.37 E -- 2542.1 4.96 83.96 2.05 2599.2 -30.6 34.7 151.9 30.61 S 16.33 E 2641. 7 5.26 84.11 0.30 2698.8 -29.7 38.9 139.7 29.68 S 25.18 E 2741.1 7.14 63.43 2.89 2798.2 -26.4 44.1 126.8 26.43 S 35.30 E 2840.1 9.31 56.83 2.36 2897.2 -19.2 51.4 112.0 19.23 S 47.63 E 2938.5 11.01 61.66 1.91 2995.6 -10.3 63.6 99.3 10.27 S 62.80 E 2987.5 12.26 63.08 2.56 3044.6 -5.6 72.0 94.5 5.60 S 71.74 E 3036.2 13.98 64.46 3.49 3093.3 -0.6 81.9 90.4 0.59 S 81. 92 E 3084.5 15.91 66.58 4.01 3141.6 4.7 93.8 87.1 4.74 N 93.66 E 3132.4 17.43 68.84 3.31 3189.5 10.2 107.4 84.6 10.16 N 106.93 E 3179.9 18.82 70.82 3.05 3237.0 15.5 122.5 82.7 15.52 N 121.53 E 3227.1 19.83 71.95 2.15 3284.2 20.8 138.8 81.4 20.79 N 137.21 E 3274.0 20.98 72.70 2.36 3331.0 26.1 156.0 80.4 26.08 N 153.82 E 3320.4 22.47 73.4 7 3.04 3377.5 31.5 174.4 79.6 31.46 N 171.52 E 3366.3 24.13 73.93 3.35 3423.4 37.0 194.1 79.0 37.01 N 190.50 E 3411.7 25.75 74.65 3.28 3468.8 42.7 215.1 78.5 42.72 N 210.80 E .~ 3456.5 27.10 75.31 2.77 3513.5 48.5 237.3 78.2 48.48 N 232.29 E 3500.5 29.22 76.20 4.33 3557.6 54.3 260.9 78.0 54.28 N 255.16 E 3543.7 31.47 76.33 4.51 3600.8 60.3 286.1 77.8 60.28 N 279.69 E 3585.7 34.26 76.21 5.57 3642.7 66.7 313.2 77.7 66.72 N 306.05 E 3626.4 36.55 76.19 4.59 3683.5 73.6 342.2 77.6 73.63 N 334.17 E 3666.2 38.18 76.31 3.27 3723.2 80.8 372.5 77.5 80.84 N 363.65 E 3705.3 38.95 76.25 1.53 3762.3 88.2 403.7 77.4 88.23 N 393.93 E 3744.1 39.18 76.29 0.47 3801.2 95.7 435.2 77.3 95.71 N 424.54 E 3 A Gyrodata Directional Survey B.P. Well: F-04,4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE51 OSS SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg.l feet feet feet deg. feet 100 ft. 3782.8 39.23 76.45 0.23 3839.9 103.2 466.8 77.2 103.16 N 455.25 E - 3821.5 39.36 76.39 0.26 3878.6 110.6 498.5 77.2 110.59 N 486.04 E 3860.2 39.33 76.38 0.07 3917.3 118.1 530.2 77.1 118.05 N 516.84 E 3898.9 39.12 76.40 0.42 3956.0 125.5 561.8 77.1 125.49 N 547.57 E 3937.7 39.04 76.47 0.18 3994.8 132.9 593.3 77.1 132.89 N 578.21 E 3976.6 39.06 76.56 0.12 4033.6 140.2 624.8 77.0 140.23 N 608.84 E 4015.3 39.35 76.55 0.58 4072.4 147.6 656.4 77.0 147.58 N 639.58 E 4054.0 39.24 76.56 0.22 4111.1 154.9 688.0 77.0 154.94 N 670.37 E 4092.8 38.95 76.69 0.59 4149.9 162.2 719.6 77.0 162.24 N 701.05 E 4131.6 39.20 76.71 0.50 4188.7 169.5 751.1 77.0 169.49 N 731.72 E 4170.4 39.14 76.78 0.15 4227.5 176.7 782.7 77.0 176.73 N 762.47 E 4209.1 39.38 76.75 0.47 4266.2 184.0 814.3 76.9 183.97 N 793.27 E 4247.9 38.91 76.89 0.94 4305.0 191.2 845.9 76.9 191.17 N 824.00 E 4286.7 39.13 76.82 0.44 4343.8 198.3 877.4 76.9 198.33 N 854.66 E 4325.5 39.22 76.84 0.17 4382.6 205.5 909.0 76.9 205.52 N 885.41 E 4364.3 38.95 76.91 0.53 4421.4 212.7 940.5 76.9 212.68 N 916.11 E -- 4403.2 39.06 77.03 0.26 4460.2 219.8 971.9 76.9 219.78 N 946.77 E 4442.0 39.06 77.12 0.11 4499.1 226.8 1003.5 76.9 226.83 N 977.48 E 4480.8 39.05 77.08 0.05 4537.9 233.9 1035.0 76.9 233.86 N 1008.18 E 4519.6 39.07 77.21 0.17 4576.7 240.9 1066.5 76.9 240.87 N 1038.90 E 4558.4 39.15 77.22 0.16 4615.5 247.8 1098.0 77.0 247.85 N 1069.66 E 4597.2 39.23 77.41 0.29 4654.3 254.8 1129.6 77.0 254.79 N 1100.48 E 4635.9 39.17 77.35 0.14 4693.0 261.7 1161.2 77.0 261.69 N 1131.32 E 4674.7 39.14 77.33 0.08 4731.8 268.6 1192.8 77.0 268.61 N 1162.12 E 4 A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE51 OSS SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg.l feet feet feet deg. feet 100 ft. 4713.5 39.09 77.34 0.09 4770.6 275.5 1224.3 77.0 275.52 N 1192.90 E 4752.3 39.03 77.38 0.12 4809.4 282.4 1255.8 77.0 282.42 N 1223.64 E "-' 4791.1 39.14 77.46 0.24 4848.2 289.3 1287.3 77.0 289.29 N 1254.41 E 4829.9 39.14 77.41 0.06 4887.0 296.2 1318.9 77.0 296.15 N 1285.22 E 4868.7 39.04 77.30 0.24 4925.8 303.1 1350.4 77.0 303.05 N 1315.98 E 4907.5 39.16 77.32 0.25 4964.6 310.0 1382.0 77.0 309.98 N 1346.75 E 4946.3 38.99 77.39 0.35 5003.4 316.9 1413.5 77.0 316.88 N 1377.50 E 4985.1 39.32 77.54 0.67 5042.2 323.7 1445.0 77.1 323.73 N 1408.32 E 5023.8 39.16 77.53 0.30 5080.9 330.6 1476.7 77.1 330.56 N 1439.20 E 5062.6 39.32 77.44 0.34 5119.6 337.4 1508.3 77.1 337.41 N 1470.08 E 5101.3 38.97 77.45 0.71 5158.4 344.3 1539.9 77.1 344.28 N 1500.89 E 5140.2 39.02 77.53 0.15 5197.3 351.1 1571.3 77.1 351.09 N 1531.61 E 5179.0 39.20 77.53 0.37 5236.1 357.9 1602.9 77.1 357.90 N 1562.40 E 5217.8 38.99 77.50 0.42 5274.9 364.7 1634.4 77.1 364.72 N 1593.19 E 5256.6 39.26 77.65 0.57 5313.6 371.5 1666.0 77.1 371.51 N 1624.00 E 5295.3 39.24 77.42 0.29 5352.4 378.3 1697.6 77.1 378.33 N 1654.90 E / 5334.0 39.22 77.46 0.06 5391.1 - 385.2 1729.2 77.1 385.21 N 1685.77 E -- 5372.8 39.21 77.61 0.19 5429.8 392.0 1760.8 77.1 392.03 N 1716.63 E 5411.6 39.01 77.65 0.40 5468.6 398.8 1792.4 77.1 398.79 N 1747.44 E 5450.4 39.24 77.68 0.47 5507.4 405.5 1823.9 77.2 405.53 N 1778.26 E 5489.1 39.00 77.71 0.48 5546.2 412.3 1855.5 77.2 412.26 N 1809.08 E 5527.9 39.22 77.63 0.45 5585.0 419.0 1887.0 77.2 418.99 N 1839.90 E 5566.7 39.11 77.62 0.22 5623.8 425.8 1918.6 77.2 425.76 N 1870.75 E 5605.6 38.88 77.49 0.50 5662.6 432.5 1950.0 77.2 432.54 N 1901.47 E 5 A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE510SS SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet feet deg. feet 100 ft. 5644.4 39.02 77.42 0.31 5701.5 439.4 1981.5 77.2 439.37 N 1932.15 E 5683.3 38.95 77.43 0.15 5740.4 446.2 2012.9 77.2 446.22 N 1962.85 E "-- 5722.2 38.87 77.58 0.24 5779.3 453.0 2044.3 77.2 453.01 N 1993.52 E 5761.0 39.26 77.51 0.78 5818.1 459.8 2075.8 77.2 459.81 N 2024.28 E 5799.7 39.44 77.57 0.37 5856.8 466.6 2107.6 77.2 466.65 N 2055.24 E 5838.4 39.20 77.58 0.47 5895.5 473.5 2139.2 77.2 473.47 N 2086.18 E 5877.2 39.09 77.69 0.26 5934.2 480.2 2170.8 77.2 480.22 N 2117.01 E 5915.8 39.61 77.55 1.04 5972.9 487.0 2202.5 77.2 487.02 N 2147.98 E 5954.5 39.18 77.63 0.86 6011.5 493.8 2234.2 77.2 493.84 N 2178.97 E 5993.2 39.16 77.49 0.18 6050.3 500.6 2265.8 77.2 500.64 N 2209.81 E 6031.9 39.34 77.48 0.37 6089.0 507.5 2297.4 77.2 507.50 N 2240.69 E 6070.7 39.09 77.71 0.58 6127.8 514.3 2329.1 77.2 514.29 N 2271.57 E 6109.4 39.31 77.65 0.44 6166.5 521.0 2360.7 77.2 521.03 N 2302.44 E 6148.2 38.98 77.75 0.67 6205.3 527.8 2392.2 77.3 527.75 N 2333.28 E 6187.1 38.95 78.01 0.33 6244.2 534.4 2423.7 77.3 534.35 N 2364.02 E 6225.9 39.18 78.12 0.47 6283.0 540.9 2455.2 77.3 540.87 N 2394.84 E "- 6264.7 38.98 78.27 0.44 6321.8 547.3 2486.7 77.3 547.32 N 2425.70 E 6303.5 39.24 78.33 0.53 6360.6 553.7 2518.2 77.3 553.72 N 2456.58 E 6342.3 39.02 78.38 0.46 6399.4 560.1 2549.8 77.3 560.09 N 2487.49 E 6381.3 38.40 78.25 1.24 6438.4 566.4 2581.0 77.3 566.42 N 2518.11 E 6420.6 38.23 78.23 0.35 6477.6 572.7 2612.0 77.3 572.74 N 2548.46 E 6459.9 37.98 78.24 0.51 6517.0 579.0 2642.9 77.3 579.03 N 2578.66 E 6499.3 37.89 78.37 0.23 6556.4 585.3 2673.6 77.4 585.26 N 2608.76 E 6538.8 37.86 78.46 0.13 6595.9 591.4 2704.3 77.4 591.42 N 2638.83 E 6 A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE51 OSS SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg.l feet feet feet deg. feet 100 ft. 6578.4 37.53 78.52 0.67 6635.4 597.5 2734.9 77.4 597.52 N 2668.79 E 6618.0 37.52 78.71 0.23 6675.1 603.5 2765.3 77.4 603.53 N 2698.65 E - 6657.8 37.20 78.72 0.65 6714.8 609.5 2795.6 77.4 609.47 N 2728.40 E 6697.6 37.15 79.04 0.41 6754.7 615.3 2825.8 77.4 615.30 N 2758.05 E 6737.6 36.79 78.98 0.72 6794.6 621.0 2855.9 77.4 621.03 N 2787.57 E 6777.6 36.57 79.18 0.50 6834.7 626.7 2885.8 77.5 626.69 N 2816.89 E 6817.8 36.41 79.31 0.35 6874.9 632.2 2915.5 77.5 632.24 N 2846.11 E 6858.2 36.06 79.49 0.74 6915.2 637.7 2945.0 77.5 637.68 N 2875.16 E 6898.6 36.22 79.46 0.31 6955.6 643.1 2974.5 77.5 643.06 N 2904.15 E 6939.0 35.82 79.70 0.85 6996.1 648.4 3003.9 77.5 648.38 N 2933.07 E 6979.5 35.87 79.96 0.33 7036.6 653.6 3033.1 77.6 653.55 N 2961.89 E 7020.1 35.62 80.17 0.55 7077.2 658.6 3062.3 77.6 658.59 N 2990.66 E 7060.8 35.40 80.73 0.78 7117.9 663.4 3091.3 77.6 663.41 N 3019.30 E 7101.6 35.43 80.82 0.12 7158.6 668.1 3120.3 77.6 668.06 N 3047.90 E 7142.4 35.02 81.17 0.91 7199.5 672.6 3149.1 77.7 672.57 N 3076.39 E 7183.3 35.13 81.19 0.22 7240.4 677.0 3177.7 77.7 676.98 N 3104.78 E '-, 7224.3 34.70 81.34 0.88 7281.4 681.3 3206.3 77.7 681.33 N 3133.07 E 7265.5 34.56 81.53 0.37 7322.5 685.6 3234.7 77.8 685.56 N 3161.17 E 7306.7 34.39 81.52 0.32 7363.7 689.7 3262.9 77.8 689.73 N 3189.16 E 7348.0 33.92 81. 75 0.99 7405.1 693.8 3290.9 77.8 693.81 N 3216.94 E 7389.6 33.68 82.27 0.75 7446.7 697.7 3318.6 77.9 697.68 N 3244.48 E 7431.2 33.55 82.64 0.48 7488.3 701.3 3346.2 77.9 701.31 N 3271.92 E 7472.9 33.67 83.03 0.48 7529.9 704.8 3373.8 77.9 704.76 N 3299.38 E 7514.5 33.74 83.28 0.32 7571.5 708.1 3401.4 78.0 708.07 N 3326.93 E 7 A Gyrodata Directional Survey B.P. Well: F-04, 4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BAY, AK Job Number: AK0402GCE51 OSS SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES feet deg. deg. deg.l feet feet feet deg. feet 100 ft. 7556.0 34.10 83.67 0.84 7613.0 711.2 3429.2 78.0 711.24 N 3354.65 E 7597.4 34.06 83.54 0.16 7654.4 714.4 3457.1 78.1 714.36 N 3382.49 E - 7638.8 34.09 84.22 0.76 7695.9 717.3 3485.0 78.1 717.35 N 3410.34 E 7680.2 34.22 84.77 0.67 7737.2 720.0 3512.9 78.2 720.04 N 3438.29 E 7721.4 34.55 86.46 2.01 7778.5 722.2 3540.9 78.2 722.20 N 3466.44 E 7762.6 34.63 88.03 1.79 7819.7 723.6 3568.9 78.3 723.56 N 3494.79 E 7803.7 34.89 88.55 0.81 7860.7 724.4 3597.0 78.4 724.41 N 3523.28 E 7844.6 35.10 90.41 2.16 7901.7 724.7 3625.1 78.5 724.67 N 3551.95 E 7885.5 35.13 91.55 1.32 7942.6 724.2 3653.2 78.6 724.18 N 3580.71 E 7926.4 35.39 92.20 0.91 7983.4 723.2 3681.3 78.7 723.24 N 3609.56 E 7967.2 35.23 92.47 0.44 8024.2 722.1 3709.4 78.8 722.06 N 3638.44 E 8008.1 34.75 92.73 1.02 8065.2 720.8 3737.2 78.9 720.76 N 3667.08 E 8049.3 34.53 93.51 0.99 8106.3 719.2 3764.8 79.0 719.21 N 3695.46 E 8090.1 35.76 94.14 2.55 8147.2 717.3 3792.6 79.1 717.29 N 3724.18 E 8130.9 35.25 95.40 1.78 8187.9 714.9 3820.6 79.2 714.88 N 3753.11 E 8171.7 35.21 96.98 1.82 8228.8 711.8 3848.2 79.3 711.77 N 3781.79 E ~ 8212.6 35.19 97.47 0.56 8269.6 708.1 3875.6 79.5 708.15 N 3810.38 E 8253.3 35.47 98.81 1.65 8310.4 704.1 3903.0 79.6 704.05 N 3839.00 E 8294.1 35.52 100.11 1.51 8351.1 699.3 3930.3 79.8 699.28 N 3867.63 E 8334.8 35.46 101.78 1.94 8391.8 693.8 3957.4 79.9 693.77 N 3896.13 E 8375.4 35.72 103.37 1.93 8432.5 687.4 3984.3 80.1 687.43 N 3924.52 E 8416.1 35.51 104.00 0.84 8473.1 680.5 4011. 0 80.2 680.54 N 3952.82 E 8456.7 35.68 104.08 0.34 8513.8 673.5 4037.6 80.4 673.48 N 3981.05 E 8497.4 35.39 104.22 0.60 8554.5 666.4 4064.2 80.6 666.38 N 4009.23 E 8538.3 35.06 104.43 0.69 8595.3 659.2 4090.6 80.7 659.24 N 4037.17 E 8 A Gyrodata Directional Survey B.P. Well: F-04,4.5"/3.5"/2.875" Location: F PAD, PRUDHOE BA Y, AK Job Number: AK0402GCE51 OSS SUBSEA DEPTH feet INCL AZIMUTH deg. deg. DOGLEG SEVERITY deg.l 100 ft. VERTICAL VERTICAL DEPTH SECTION feet feet CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 8579.2 35.18 104.33 0.26 8636.2 652.1 4117.0 80.9 652.10 N 4065.03 E '- 8620.1 34.90 104.38 0.56 8677.2 645.0 4143.4 81.0 644.98 N 4092.85 E 8661.2 34.57 104.36 0.66 8718.3 637.9 4169.5 81.2 637.91 N 4120.44 E 8702.5 34.02 104.92 1.28 8759.6 630.8 4195.4 81.4 630.80 N 4147.70 E 8744.0 33.92 104.76 0.26 8801.0 623.6 4221.0 81.5 623.64 N 4174.71 E 8785.5 33.58 104.94 0.72 8842.6 616.5 4246.6 81.7 616.52 N 4201.56 E 8827.2 33.43 104.95 0.31 8884.3 609.4 4271.9 81.8 609.40 N 4228.23 E Final Station Closure: Distance: 4271.92 ft Az: 81.80 deg. "- 9 gyrq'data ) ) 4. QUALITY CONTROL ~fa ) QUALITY CONTROL REPORT JOB NUMBER: AK0402GCE510 TOOL NUMBER: MAXIMUM GYRO TEMPERATURE: MAXIMUM AMBIENT TEMPERATURE: MAXIMUM INCLINATION: AVERAGE AZIMUTH: WIRELlNE REZERO VALUE: REZERO ERROR I K : CALIBRATION USED FOR FIELD SURVEY: CALIBRATION USED FOR FINAL SURVEY: PRE JOB MASS BALANCE OFFSET CHECK: POST JOB MASS BALANCE OFFSET CHECKl : CONDITION OF SHOCK WATCHES UPON ARRIVAL AT RIG: UPON COMPLETION OF SURVEY: UPON RETURN TO ATLAS BOTTOM LINE COMPARISIONS M.D. INC AZIMUTH FIELD SURVEY FINAL SURVEY 10300 33.00 10300 33.43 104.00 104.95 811 78.26 C 22.74 C 39.44 90.21 ) Add 10' to outrun 1.03 4207 4207 .48 .27 OK OK OK TVD 8854.90 8884.3 NORTHING EASTING 672 N 609.4N 4312 E 4228.2E gyrojdata ) ) FUNCTION TEST JOB NUMBER: AK0402GCE510 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 3000 11.01 11.01 11.01 11.01 11.01 AZIMUTH M.D. ft 1 2 3 4 5 3000 61.76 61.66 61.60 61.54 61.69 gyrofdata ) , " 5. EQUIPMENT AND CHRONOLOGICAL REPORT gyrqIdata ) ) EQUIPMENT REPORT JOB NUMBER: AK0402GCE510 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 811 COMPUTER A0693 GYRO SECTION A0307 POWER SUPPLY DATA SECTION C0202 PRINTER A0029 POWER SECTION C0206 INTERFACE A0143 BACKUP TOOL No. 405 COMPUTER A0921 GYRO SECTION A0097 POWER SUPPLY A0085 DATA SECTION C0159 PRINTER POWER SECTION C0197 INTERFACE A0166 WIRELlNE COMPANY: SCHLUMBERGER CABLE SIZE: 7/32" RUNNING GEAR TOTAL LENGTH OF TOOL: 30' MAXIMUM 0.0. : 1.75 TOTAL WEIGHT OF TOOL: 240 WEDNESDAY, 4/03/02 07:00 SUBMIT RESULTS 11 :45 TO ANCHORAGE TUESDAY, 4/02/02 07:30 TO LOCATION 08:15 ARRIVE LOCATION, MU TOOL 09:30 RU WIRELINE, MU TOOL 10:15 PU TOOL, PRESSURE TEST LUBRICATOR 11:00 START RUN 12:15 SURVEY TO 3000' 13:45 SURVEY TO 10300' CONTINUOUS 15:00 SURFVEY OUT 15:30 LD TOOL 16:00 BD TOOL 16:45 TO DEADHORSE 22:00 CHECK TOOL PROCESS SURVEY MONDAY, 4/01102 11:15 TO SLOPE 13:10 ARRIVE SLOPE 21:00 CHECK TOOLS AND RUNNING GEAR JOB NUMBER: AK0402GCE510 CHRONOLOGICAL REPORT ) .,) l gyrojdata ) ) B,.. BP Baker Hughes INTEQ Survey Report ............."."...."'.........,,..... INTEQ Company: SP Amoco Field: Prudhoe Bay Site: PB F Pad Well: F-04 Wellpath: F-04A Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Date: 3/27/2003 Time: 16:15:16 Page: Co~ordinatè(NE) Reference: Well: F-04; True North Vertical (TVi>j Reference: 4 : 042/2/1971 00:00 57.1 Section (YS) Reference: Well (0.00N;0.00E,350.00Azi) Survey Calculation Method: MinimuillCur'Vature Db: Oracle Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Site: PB F Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5972527.29 ft 650960.70 ft Latitude: Longitude: North Reference: Grid Convergence: 70 19 55.283 N 148 46 31.468 W True 1 .15 deg Well: F-04 Slot Name: 04 F-04 Well Position: +N/-S 1280.42 ft Northing: 5973827.99 ft Latitude: 70 20 7.875 N +E/-W 1025.27 ft Easting : 651959.92 ft Longitude: 148 46 1 .527 W Position Uncertainty: 0.00 ft Wellpath: F -04A Drilled From: F-04APB 1 500292008901 Tie-on Depth: 10783.00 ft Current Datum: 4: 042/2/1971 00:00 Height 57.10 ft Above System Datum: Mean Sea Level Magnetic Data: 1/9/2003 Declination: 25.96 deg Field Strength: 57536 n1' Mag Dip Angle: 80.83 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 0.00 0.00 0.00 350.00 Survey Program for Definitive Wellpath Date: 3/6/2003 Validated: Yes Version: 17 Actual From To Survey Toolcode Tool Name ft ft 100.00 10300.00 Gyro (0) GYD-GC-MS Gyrodata gyrocompassing m/s 10300.60 10783.00 MWD (2) MWD MWD - Standard 10783.00 11206.00 MWD MWD MWD - Standard Annotation 10783.00 9028.28 KOP 11206.00 9018.83 TD Survey: MWD Start Date: 2/27/2003 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Survey MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS ft deg deg ft ft ft ft ft ft ft deg/100ft 10783.00 91.31 356.78 9028.28 8971.18 1024.90 3941.44 5974932.46 655879.49 324.91 0.00 10812.45 95.65 4.94 9026.49 8969.39 1054.26 3941.88 5974961.82 655879.34 353.74 31.32 10844.95 94.91 5.77 9023.50 8966.40 1086.48 3944.90 5974994.10 655881 .70 384.95 3.41 10876.06 95.01 8.89 9020.81 8963.71 1117.22 3948.85 5975024.91 655885.03 414.53 10.00 10917.81 94.88 15.29 9017.20 8960.10 1157.87 3957.56 5975065.72 655892.91 453.06 15.28 10954.95 92.95 18.91 9014.67 8957.57 1193.28 3968.45 5975101.34 655903.09 486.03 11.03 10989.45 89.94 23.21 9013.80 8956.70 1225.45 3980.84 5975133.75 655914.82 515.57 15.21 11029.51 89.97 18.20 9013.83 8956.73 1262.91 3995.00 5975171.49 655928.22 550.00 12.51 11059.90 87.79 11 .45 9014.42 8957.32 1292.26 4002.77 5975200.99 655935.39 577.56 23.34 11092.20 91.69 5.15 9014.57 8957.47 1324.20 4007.43 5975233.02 655939.40 608.20 22.94 11124.62 86.78 3.19 9015.00 8957.90 1356.52 4009.79 5975265.38 655941 .10 639.62 16.31 Company: BPAmoco Field: Prudhoe Bay Site: PB F Pad Well: F-04 Wellpath: F-04A Survey MD ft 11154.66 11182.70 11206.00 lncl deg 86.96 87.79 87.79 Azim deg 1.32 358.97 358.97 ) ) BP Baker Hughes INTEQ Survey Report TVD ft 9016.64 9017.93 9018.83 SSTVD ft 8959.54 8960.83 8961.73 .'....."...,.,,,......'..'.................... I.N'[EQ Date: 3/27/2003 Time: 16:15:16 Page: 2 Co..:ordinate(NE) Reference: Well: F-04,· True· North Vertical (TVD}Reference: 4:04 2/2/1971 00:00 57.1 Sectit>n(VS) Reference: Well (0;00N,0.00E,350~00Azi) Survey Calculation Method: Minimum Curvature Db: Oracle N/S EIW MapN MapE VS DLS ft ft ft ft ft degl100ft 1386.49 4010.97 5975295.36 655941.68 668.93 6.24 1414.50 4011.04 5975323.37 655941.18 696.50 8.88 1437.78 4010.62 5975346.63 655940.29 719.50 0.00 Parent Wellpath: Tie on MD: Rig: Ref. Datum: BP Amoco LEGEND F-04 (F-04) F-Q4 (F-Q4APB 1) F-Q4A T AM , 4 DirEct: {BOli Ley -6613 Saker Hughes i~~~¡: f~ih~o¿g~~~~?q.[0m Wellpath: (F-04/F-04A) Azimuths to True North Magnetic North: 25.96· Magnetic Field Strength: 57536nT Dip Angle: 80.83· Date: 1/9/2003 Model: BGGM2002 Created By: Brij Potnis Date: 3/27/2003 ~--: ~ .... §-.-\, fo\ ~ ;~~;;;,~~~~ WELLPATH DETAILS F-04A 500292008901 F-04APB1 10783.00 bp Cnntact jr:f~f:"natiorL ~---~,--~-~~-- INTEQ Nordic 1 4: 04 2/2/1971 00:00 57.1Oft Starting From TVD V.Sectlon Origin Origin Angle +N/-S +El-W 350.00· 0.00 0.00 0.00 REFERENCE INFORMATION Co-ordinate (N/E¡ Reference: Well Centre: F-04, True North Vertical ('NO Reference: System: Mean Sea Level Section (VS Reference: Slot - 04 (O.OON,O.OOE) Measured Depth Reference: 4: 042121197100:00 57.10 Calculation Method: Minimum Curvature ANNOTATIONS TVD MD Annotation 8971.20 10783.00 KOP 8961.75 1'206.00 TO 8780 8800 8820 8840 - .58860 = 08880 N - .c 8900 .. a. ~ 8920 Q i 8940 C,) :e 8960 ~ > 8980 ~ 29000 I- :------- -- 9020 9040 9060 9080 o 20 40 1450 ~'-,vv ; . . ,-' .... · ..... · ...... .... · .... . . . . . .. ................m .' .' . !~~firl ·EJ-W Shape OCOO 14.(622 31&043 Pd'¡p'I 000 31866 331810 Pdygo"I 000 15-C1!ó 3992.0 Pct¡gon :m~ ,m~ ~mH ~ . . '> · · ...... . . . '''''U .. . . · · .... ... ...... . I . ..... . .; I .. .... f I ..m'. ./ . . . · ..;. , oJUU · · · ...... . . .. ''''''U .. . è120O-: · . ~ . ~II"U .' ~ ;1100- . . :mmm ..... ~ ~ 105D-:: .. . . . . . . . --fKõPl.... . ... .... 100~. ........ . .. .... 95~ .... .' ........ ·...m .............. ..... ... · ... .... ... . . 'mmm ::: ..... ..\ . ........ ... .... ....... 800~ .'. . . · ..\. .' · , '.! .! .... ..... ....... ... ... ....m ..: .>. ..... . \.. .. '.. ...... .... m .............. ... .............. . ... .. .. ...... ......... ... . . : . . ., ·e··.... . . . . .!." . ; ., '!" ,." . . . . . . ; . . . . . . . . . . . 3-<150 3~ 00 3550 3f:>0 3650 3700 3750 3800 3850 3900 4000 41 00 ~ 150 4< 00 4400 4450 4~ 00 4~ 50 4E DO 4650 · .. .. '. .... . · . . . · · · · · ¡ · I . . . . · . · .. .. . · · .' . . .. ....... · . ... .,. ....m .................. · ..... .. . .. .m........ ..... ..... .. . ..m .... . . . ----- 280 320 340 360 380 400 460 Vertical Section at 350.00° [20ft/in] 3/27/2003 -1 :-12 PM ) ) II.. BADa HUGHES IN'TEQ BP Baker Hughes INTEQ Survey Report Company: BP Amoco Field: Prudhoe Bay Site: PB F Pad Well: F-04 WeUpath: F-04APB1 Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Date: 3/27/2003 Time: 16:12:59 Page: Co-ordinate(NE) Reference: Well: . F~04; True North Verticat(TVD) Reference: 4: 042/2/197100:0057.1 Section (VS) Reference: Well (0;00N,O.00E,69~83Azi) SurveyCalcubitiorl Method: MinimumCurvature Db: Oracle Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Site: PB F Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5972527.29 ft 650960.70 ft Latitude: Longitude: North Reference: Grid Convergence: 70 19 55.283 N 148 46 31.468 W True 1.15 deg Well: F-04 Slot Name: 04 F-04 Well Position: +N/-S 1280.42 ft Northing: 5973827.99 ft Latitude: 70 20 7.875 N +E/-W 1025.27 ft Easting : 651959.92 ft Longitude: 148 46 1.527 W Position Uncertainty: 0.00 ft Wellpath: F-04APB1 Drilled From: F-04 500292008970 Tie-on Depth: 10010.00 ft Current Datum: 4: 04 2/2/1971 00:00 Height 57.10 ft Above System Datum: Mean Sea Level Magnetic Data: 3/5/2003 Declination: 25.90 deg Field Strength: 57539 nT Mag Dip Angle: 80.84 deg Vertical Section: Depth From (TVD) +N/-S +E/-W Direction ft ft ft deg 0.00 0.00 0.00 69.83 Survey Program for Definitive Well path Date: 3/5/2003 Validated: Yes Version: 3 Actual From To Survey Toolcode Tool Name ft ft 100.00 10300.00 Gyro (0) GYD-GC-MS Gyrodata gyrocompassing m/s 10300.60 11226.00 MWD MWD MWD - Standard Annotation 10010.00 8644.42 KOP 11226.00 9048.24 TD Survey: MWD Start Date: 2/26/2003 Company: BakerHugheslNTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Survey MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS ft deg deg ft ft ft ft ft ft ft deg/100ft 10010.00 35.12 104.34 8644.42 8587.32 650.80 4070.66 5974561.09 656016.26 4045.37 0.00 10023.43 23.29 104.34 8656.12 8599.02 649.18 4077.00 5974559.59 656022.63 4050.76 88.12 10050.00 20.76 127.00 8680.80 8623.70 645.04 4085.87 5974555.63 656031.58 4057.65 33.15 10080.15 29.25 141.00 8708.12 8651.02 636.07 4094.80 5974546.85 656040.68 4062.94 34.15 10110.85 31.13 174.00 8734.84 8677.74 622.26 4100.38 5974533.15 656046.55 4063.42 53.82 10140.19 27.61 197.00 8760.48 8703.38 608.16 4099.18 5974519.04 656045.64 4057.44 40.03 10170.97 24.32 227.75 8788.28 8731.18 597.03 4092.37 5974507.77 656039.06 4047.20 44.53 10200.28 25.25 264.01 8815.04 8757.94 592.29 4081.63 5974502.81 656028.41 4035.48 51.24 10237.90 23.18 315.28 8849.72 8792.62 596.76 4068.30 5974507.01 656014.99 4024.51 54.57 10265.94 23.79 340.12 8875.50 8818.40 606.02 4062.48 5974516.16 656008.98 4022.24 35.13 10295.40 18.91 338.39 8902.93 8845.83 616.06 4058.69 5974526.11 656005.00 4022.15 16.70 10325.86 27.45 338.10 8930.90 8873.80 627.18 4054.25 5974537.14 656000.33 4021.82 28.04 ) BP ) "..I.. ø HIS Baker Hughes INTEQ Survey Report IN'l'.ßQ Company: BP Amoco Date: 3/27/2003 Time: 16:12:59 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-04, True North Site: PB F Pad Vertical (TVD) Reference: 4: 042/2/1971 00:00 57.1 Well: .. ·F~04 Section (VS) Reference: Well (0.00N,O~00E,69.83Azi) Wellpath: F-04APB1 Survey Calculation Method: Minimum. Curvature Db: Oracle Survey MD lncl Azim TVD SSTVD N/S E/W MapN MapE VS DLS ft deg deg ft ft ft ft ft ft ft deg/100ft 10355.46 34.73 329.70 8956.24 8899.14 640.81 4047.44 5974550.63 655993.24 4020.13 28.58 10385.88 44.70 327.41 8979.62 8922.52 657.35 4037.28 5974566.96 655982.75 4016.29 33.12 10416.57 56.77 327.14 8999.00 8941.90 677.30 4024.45 5974586.64 655969.53 4011.13 39.33 10457.65 72.82 329.51 9016.44 8959.34 708.85 4005.04 5974617.79 655949.48 4003.80 39.41 10494.54 79.04 345.07 9025.46 8968.36 741 .76 3991.34 5974650.41 655935.12 4002.29 44.22 10527.60 89.82 347.58 9028.66 8971.56 773.68 3983.58 5974682.17 655926.72 4006.01 33.47 10562.55 90.12 343.04 9028.68 8971.58 807.48 3974.72 5974715.78 655917.17 4009.35 13.02 10593.95 89.48 346.79 9028.79 8971.69 837.79 3966.55 5974745.92 655908.39 4012.14 12.12 10630.36 89.54 349.31 9029.10 8972.00 873.41 3959.02 5974781.37 655900.13 4017.34 6.92 10660.03 89.75 350.76 9029.29 8972.19 902.63 3953.88 5974810.48 655894.41 4022.60 4.94 10705.41 90.43 353.46 9029.22 8972.12 947.58 3947.65 5974855.29 655887.27 4032.26 6.14 10736.50 90.43 355.36 9028.98 8971.88 978.52 3944.62 5974886.16 655883.62 4040.08 6.11 10790.03 91.44 357.00 9028.11 8971.01 1031.92 3941.06 5974939.47 655878.97 4055.15 3.60 10823.06 91.84 357.81 9027.16 8970.06 1064.90 3939.56 5974972.41 655876.81 4065.12 2.73 10853.35 90.55 2.80 9026.53 8969.43 1095.17 3939.72 5975002.68 655876.36 4075.72 17.01 10896.38 84.56 4.76 9028.37 8971.27 1138.05 3942.56 5975045.60 655878.32 4093.16 14.64 10928.92 85.12 8.53 9031.29 8974.19 1170.23 3946.31 5975077.85 655881 .41 4107.78 11.67 10961.52 87.67 11 .48 9033.34 8976.24 1202.27 3951.96 5975109.99 655886.42 4124.13 11.95 10990.98 87.51 14.89 9034.58 8977.48 1230.92 3958.67 5975138.78 655892.55 4140.32 11.58 11024.42 85.25 10.07 9036.70 8979.60 1263.49 3965.88 5975171.49 655899.10 4158.32 15.89 11 068. 15 83.02 359.52 9041 .18 8984.08 1306.78 3969.52 5975214.83 655901.86 4176.66 24.53 111 05.53 85.67 0.51 9044.86 8987.76 1343.97 3969.53 5975252.01 655901.11 4189.50 7.56 11165.38 89.63 6.28 9047.32 8990.22 1403.63 3973.07 5975311.73 655903.45 4213.40 11.68 11195.83 88.96 10.49 9047.69 8990.59 1433.74 3977.51 5975341.92 655907.27 4227.95 14.00 11226.00 88.96 10.49 9048.24 8991.14 1463.41 3983.01 5975371.69 655912.16 4243.33 0.00 LEGEND F-04 (F-04) F-04 (F-04APB1) F-04A T AM . ~ ~:~!~~¡:{~~{~~X~@¡~~eq.(~m Bai<er Hughes ¡NTEO~ {90!! 26ï-t",;€-DO Wellpath: (F-04/F-04A) Azimuths to True North Magnetic North: 25.96° Magnetic Field Strength: 57536nT Dip Angle: 80.83° Date: 1/9/2003 Model: BGGM2002 Created By: Brij Potnis Date: 3/27/2003 BP Amoco Parent Wellpath: Tie on MD: WELLPATH DETAILS F-04A 500292008901 F-04APB1 10783.00 -j; ., \. \.: .,\: ..... '(:..., "i;i~;;;;~"/ C{;n~act ;r:1çnTi3tior:. .~.-----~~~.. INTEl¿ Nordic 1 4: 04 2/2/197100:00 57.1Oft Starting From TVD REFERENCE INFORMA nON 0.00 ANNOTATIONS TVD MD Annotation 8971.20 '0783.00 KOP 8961.75 11206.00 TO 8780 8800 8820 8840 - .58860 = ~ 8880 - .c 8900 ... a. G) 8920 Q i 8940 (J :e 8960 G) > 8980 G) ë 9000 ... .~ .--....----- Rig: Ref. Datum: V.Sectlon Origin Origin Angle +N/-S +'E./-W 350.00° 0.00 0.00 Co-ordinate (N/E¡ Reference: Well Centre: F-D4, True North Vertical (TVD Reference: System: Mean Sea Level Section (VS Reference: Slot - 04 (O.OON,O.OOE) Measured Depth Reference: 4: 042/2/197100:00 57.10 Calculation Method: Minimum Curvature 9020 9040 9060 9080 o 20 40 60 ¡~f~' 'E/>N ~ 000 1U622 31í)IJU Pc:i't<Pn GOO 31666 3.37810 Pdyg:¡n 060 1501155 3992.t) ~ ~~ Jn~ ~mH ~ ~ 3650 3700 3750 3800 3a"50 3900 4000 West(-)/East(+) [50ft/in] .~ 320 340 360 380 460 Vertical Section at 350.00° [20ft/in] 3/27/2003 I :'12 PM ~1f~íSŒ ~',~[ I.! .!\ 'r' , I I ' U¿) L ) !Æ~!Æ~~~!Æ ) A.I,A.~KA. OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7fH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Ted Stagg CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Prudhoe Bay UnitF-04A BP Exploration (Alaska), Inc. Permit No: 202-100 (revised) Sur Loc: 2972' NSL, 2884' EWL, Sec. 02, TIIN, RI3E, UM Btmhole Loc. 1531' NSL, 999' EWL, Sec. 01, TIIN, RI3E,UM Dear Mr. Stagg: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional peimits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required pennitting detenninations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be· given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, ~ð'-~ Michael L. Bill Commissioner BY ORDER OF THE COMMISSION DATED this 2f''''day of January, 2003 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration, Production and Refineries Section j¡.4 GA- i /2610 '5 12. Distance to nearest property line 13. Distance to nearest well " ADL 028277,1531' MD No Close Approach / 16. To be completed for deviated wells Kick Off Depth 10010' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Casino WeiQht Grade CouDlino 2-3/811 4.6# L-80 ST-L Hole 311 ..', STATE OF ALASKA ALAS~,· )OIL AND GAS CONSERVATION COh" )ISSION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil o Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool KBE = 57.1' Prudhoe Bay Field / Prudhoe 6. Property Designation Bay Pool ADL 028280 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number F-04A / 9. Approximate spud date 02/07/03 / Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 11300' MD / 8971' TVDss 17. Anticipated pressure {s~ 20 AAC 25.035 (e) (2)} 90 0 Maximum surface 2216 psig, At total depth (TVD) 8800' / 3272 psig Setting Depth Top Botom Quantitv of Cement Length MD TVD MD TVD (include staae d~ta) 2740' 8560' 7398' 11300' 8971' 64 sx Class 'G' /' I /' Revised: 01/27/03 1 a. Type of work 0 Drill II Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface x = 651960, Y = 5973828 /'2972' SNL, 2884' WEL, SEC. 02, T11 N, R13E, UM /At top of productive interval x = 655961, Y = 5974574 23081 SNL, 1132' EWL, SEC. 01, T11 N, R13E, UM At total depth x = 655811, Y = 5975348 1531' SNL, 999' EWL, SEC. 01, T11N, R13E, UM 11. Type Bond (See 20 AAC 25.025) Number 2S 100302630-277 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 1 0676 feet 9204 feet 1 0561 feet 9105 feet Length Plugs (measured) Top of Cement Cap at 10080 (05/02) Top of Sand Plug at 10300 (05/02) IBP Packer rubbers and bands at 10561' Junk (measured) Size Cemented MD TVD 96' 96' 2004' 2004' 9312' 10665' Structural Conductor Surface Intermediate Production Liner 96' 2004' 9312' 3011 Cemented 18-5/8" 9200 sx Permafrost II 13-3/811 x 9-51811 2410 sx Class 'G', 1775 sx PF II 10665' 9-5/811 X 711 460 sx Class 'G' (Uner Tie Back 10 Surface) RECEIV'ED Below Sand and Cement Cap: (Not Sqzd) 10394' - 10404', 10440' - 10490' Sqzd Intervals: 10193' - 10490' , , i\ 'J 2 7 20 n '-~ true vertical Below Sand and Cement Cap: (Not Sqzd) 8963' - 8972', 9002' - 9045',.-1/-\\, . ¡ Vv' Sqzd Intervals: 8795' - 9045' æJ R, ,.... ,., '-,n " I',..;..· "'swn 20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter~ti!ffi II Dritt~1þ1ç~' ~"...H~:' II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report II 2m~WS:Ð~0 Requirements Contact Engineer Name/Number. Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubb/e, 564-4628 210. ~~:~::y C:~i;œ:aij~e and correct t:,::;=~~~;n.~;:,.., "<. .. ~::~,[~~3 Permit Number API Number APP~crÆ~D8:~e See cover letter 202-100 50- 029-20089-01 'I :f..)] 10. J for other reQuirements Conditions of Approval: Samples Required 0 Yes 181 No Mud Log Requi~d 0 Yes EI No Hydrogen Sulfide Measures I&J Yes 0 No Directional Survey Required ŒI Yes 0 No Required Wor~ing Pr~ssLJre for BOPE P 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: T~* -gorE to -;500 f's, . ORIGINAL SIGNED BY MI Rill Perforation depth: measured .Approved By Form 10-401 Rev. 12-01-85 Commissioner by order of the commission 1 Date L I î ~1>¡ y tJ :J s bmit~~ Triplicate l l, '." \, 1_.... ) ) BP F-04a CTD Sidetrack / BackQround: Nordic 1 CTD rig moved onto F-04 on 5/18/02 under Permit No. 202-100. Before even starting to mill the window we twisted off a motor shaft leaving a fish in the well. When Nordic 1 was unable to recover the fish the rig was moved off and service coil tried fishing. Those attempts failed also. / Summary of Operations: To resume operations on F-04a we are planning to lay additional 17 ppg cement to cover the fish and provide for a cement ramp kick off in Zone 4. While the target interval remains the same as originally permitted, the kick off point will be higher. The new directional plan is attached. V" One fault, 15-25 ft throw, will be crossed in the horizontal section of F-04a. This fault orientation and throw suggest a minimal risk of lost circulation but may present a geosteering challenge in re-Iocating Zone 1 B on the far side of the fault. /"j Phase 1: Prep work. Planned for F/~.r2603. "'.....".'."....) 1. Service coil to lay 17 ppg ~~nt from 10,090' to approx. 9960' toyovide for a geme~t,.../' whipstock. A minimum of 8 bbls of 17 ppg cement will be used. l...,----- Phase 2: Mill window, Drill and Complete sidetrack: Planned for Feb. 7, 2003./ Drilling coil will be used to mill the window at 10,010' MD (8587ss)from a cement ramp then drill and complete the directional hole as per attached plan. Maximum hole angle will be 90 degrees. ~ Mud Program: · Phase 1: Seawater /....) · Phase 2: Mill with seawater/biozan, drill with Flo-Pro (8.~r1pg) Disposal: · All drilling and completion fluids and all other Class" wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: / The production liner y¡iH 23/8" ST-L from TD to approx. 8560'MD (7398 'ss). The liner will be cemented with a minimum 0:..13 bb to bring cement up to approx. 9,800' (8416ss) or about 210ft above the window. Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. /' · The annular preventer will be tested to 400 psi and 2500 psi. Directional · See attached directional plan. Max. planned hole angle is 91 deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. /' Logging · MWD Gamma Ray will be run in the open hole section. Memory CNL will be run inside the liner. Hazards · The maximum recorded H2S on F Pad is 30 ppm on well F-43. · Zones 3 and 2 conglomerates may cause slow ROP, possible bit damage. · One small fault mid-polygon may cause lost circulation. Reservoir Pressure Res. press. is estimated to be 3272 psi at 8800'ss (7.2 ppg emw). Max. surface pressure with gas (0.12 psi/ft) to surface is 2216 psi. / / TREE = \ WELLHEAD = ACïÜð,-rOR ;, KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = DatumlVD= 6"CrN McEVOY OTIS 57.07' 39'.17ï 3000' 4~~.~~~~η 10303' ··ssöÖ'SS , F-04A ) ) , Proposed CTD Sidetrack Revised Jan. 6, 2003 14-1/2" TBG-IPC, 12.6#, L-80, ID = 3.958" l-i 19-5/8" CSG, 47#, NSCC, ID = 8.681" l-i 113-3/8" CSG, 72#, N-80, ID = 12.347" l-i 48 1901' 1965' 2000' 2022' K ~ I 1 1965' .....--t 2000' "--1 2022' ST MD 7 3715 -.! 6 5006 5 5887 4 6543 3 6891 2 7204 1 7326 SAFETY NOTES: COMMUNICATION IN 18-5/8" x 13-3/8" ANNULUS (FILLED WITH CRUDE) NO LATCH ON VALVE AT GLM #3. 1 Top of 2-3/8" liner l-i 13-1/2" TBG. 9.3#, L-80, ID = 2.992" l-i 17" TBG, 26#, L-80, ID = 6.276" l-i 1 TOP OF 7" LNR l-i II 1 Z'-- 8492' 8560' 8583' ,g 8 8542' 8583' 8642' , l 8642' I i f--i 8641' 1-i9-5/8" TrN SN-6 PKR 1 19-5/8" CSG, 47#, N-80, ID = 8.681" l-i 9312' µ PERFORA TION SUMMARY REF LOG: SWS BHCS (RUN2A) ON 03/14/71 ANGLE AT TOP PERF: 34 @ 10193' Note: Refer to A'oduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4" 4 10193-10221 cmt'ed 07/25/98 4" 4 10261-10296 cmt'ed 07/25/98 4" 4 10310-10325 cmt'ed 07/25/98 4" 4 10332-10374 cmt'ed 07/25/98 4" 4 10386-10404 cmt'ed 07/25/98 2-1/2" 6 10394-10404 cmt'ed 03/16/02 2-1/8" 6 10415-10430 cmt'ed 07/25/98 2-1/8" 4 10430-10454 cmt'ed 07/25/98 2-1/8" 4 10440-10490 cmt'ed 08/06/98 2-1/8" 6 10454-10479 cmt'ed 07/25/98 2-1/8" 4 10479-10490 cmt'ed 07/25/98 DATE 06/26f76 OS/26/87 02108/01 07/17/01 03/16/02 1-i4-1/2" OTIS -XLB SSSV LAND NIP, ID = 3.813" 1-i4-1/2" x 3-1/2" XO 1 l-i 9-5/8" x 7" XO 1 l-i 13-3/8" x 9-518" XOI GAS LIFT MANDRB.S lVD DEV TYPE VLV LATCH PORT 3599 30 FMH-O BK-2 4598 47 FMH-O BK-2 5275 49 FMH-O BK-2 5781 48 FMH-O BK-2 6048 45 FMH-O BK-2 6289 48 FMH-O BK-2 6383 49 FMH-O BK-2 1-i3-1/2" OTIS XA SLIDING SLV, ID = 2.75" I DATE - 7" Otis PKR w 1 X(HCL), ID=2.75" (milled to 2.74" ID) - ;J-1f¿" x ;¿:-(/'ö" xu (milled) .. /9800 proposed top of liner cement ./ ...---- 9960' proposed top of 17 ppg cement 10,010' 1 ./ "¡~~::p 2-3/8" cmt'ed and perted l-i 11300' 10460'1 I-iTailpipe nilled off and dropped I 1 PBTD l-i 10561' 10561' l-i IBP PKR RUBBERS & BANDS I I 7" LNR, 29#, N-80, ID = 6.184" l-i 10665' REV BY COMMENTS ORIGINAL COMR..ETION LAST WORKOVER SIS-MH CONVERTED TO CANVAS RNITP CORRECTIONS CWS/tlh ADD PERFS DATE REV BY COMMENTS FRUDHOE BAY UNIT' WELL: F-04 PERMIT' No: 71-0020 API No: 50-029-20089-00 Sec. 2, T11N, R13E BP Exploration (Alas ka) TREE = , WELLHEAD = .ACTUA TOR = KB. ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum lVD = 6"CrN McEVOY OTIS 57.07' 39.17' 3000' 40 @ 3900' 10303' 8800' SS ) F-04A ) Proposed Prep for CTO Sidetrack revised 1/06/03 e 1965' C K 2000' 2022' ~ L - 14-1/2" TBG-IPC, 12.6#, L-80, ID = 3.958" 1-1 19-5/8" CSG, 47#, NSCC, ID = 8.681" 1-1 113-3/8" CSG, 72#, N-80, ID = 12.347" 1-1 SAFETY NOTES: COMMUNICATION IN 18-5/8" x 13-3/8" ANNULUS (FILLED WITH CRUDE) NO LATCH ON VALVE ATGLM#3. 17" TBG, 26#. L-80, ID = 6.276" 1--1 1 TOP OF 7" LNR 1-1 8642' ,I 8642' 1 19-5/8" CSG. 47#, N-80, ID = 8.681" 1--1 9312' µ ÆRFORA TION SUMMARY REF LOG: SWS BHCS (RUN2A) ON 03/14/71 ANGLEATTOPÆRF: 34 @ 10193' Note: Refer to Production DB for historical perf data SIZE SPF INTERV A L Opn/Sqz DA TE 4" 4 10193-10221 cmt'ed 07/25/98 4" 4 10261-10296 cmt'ed 07/25/98 4" 4 10310-10325 cmt'ed 07/25/98 4" 4 10332-10374 cmt'ed 07/25/98 4" 4 10386-10404 cmt'ed 07/25/98 2-1/2" 6 10394-10404 cmt'ed 03/16/02 2-1/8" 6 10415-10430 cmt'ed 07/25/98 2-1/8" 4 10430-10454 cmt'ed 07/25/98 2-1/8" 4 10440-10490 cmt'ed 08/06/98 2-1/8" 6 10454-10479 cmt'ed 07/25/98 2-1/8" 4 10479-10490 cmt'ed 07/25/98 I PBTD 1-1 10561' I 7" LNR, 29#, N-80, ID = 6.184" I-{ 10665' DATE REV BY COMMENTS DATE REV BY 06/26/76 ORIGINA L COMPlETION OS/26/87 LAST WORKOVER 02/08/01 SIS-MH CONVERTED TO CANVAS 07/17/01 RNlTP CORRECTIONS 03/16/02 CWS/tlh ADD ÆRFS I I /--1 ""-1 II - ST MD 7 3715 6 5006 5 5887 4 6543 3 6891 2 7204 1 7326 I 8492' 1 ~ x- 8542' 1901' 1-14-1/2" OTIS -XLB SSSV LAND NIP, ID = 3.813" 1965' 2000' 2022' 1-14-1/2" x 3-1/2" XO I 1--19-5/8" x 7" XO I 1-113-3/8" x 9-5/8" XOI GAS LIFT MANDRELS lVD DEV ìYÆ VLV LATCH 3599 30 FMH-O BK-2 4598 47 FMH-O BK-2 5275 49 FMH-O BK-2 5781 48 FMH-O BK-2 6048 45 FMH-O BK-2 6289 48 FMH-O BK-2 6383 49 FMH-O BK-2 1-13-1/2" OTIS XA SLIDING SLV, ID = 2.75" I - 7" Otis PKR w / X(HCL) 2.313. X Nipple I milled out to 2.74" PORT DATE ____ 3 1/2" X 27/8" XO milled out to 2.74" and jet cut at 8561 ELMD, 8584 tally depth g ~ f-1 8641' 1--1 9-5/8" TrN SN-6 PKR I . ._1 9876' 1-1 MARKER JOINT I X X X : --9960' target top for new 17 ppg cmt. X X x: - 10,080' approx current top of cement /" ~~ 10,396' HTailpipe rrilled off and dropped I , Placed carbolite from PBTO to 10,305' then 17 ppg from 10,305 to 10,080 for window /' . - Last TO tag @ 10,510' (5/1/01) ,/ I 10561' 1--1 IBP PKR RUBBERS & BANDS I COMMENTS PRUDHOE BAY UNIT WELL: F-04 ÆRMIT No: 71-0020 API No: 50-029-20089-00 Sec.2,T11N,R13E BP Exploration (Alaska) Plan: Plan #10.1 (F-04/p1an#10.1 F-04A) Created By: Bnj Potnis Date: 1191: Contact Information' Direct (907) 250-0132 E-mail: PotnisBP@BP.com Baker Hughes INTEQ: (907) 267-66QO -.--- Magnetic Field Strength: 57536nT Dip Angle: 80.83· Date: 119/2003 Model: BGGM2002 T Azimuths to True North ^ M Magnetic North: 25.96· f é LEGEND F-04 (F-04) Pfan#1 0.1 F-04A Plan #10.1 '-...:" ....: _.- RADII HUGHES h'iTEQ ObP i BP Amoco WlLL'ATH DnAlL8 ,.....to.t ,-4141I _lOt .004 100tO.00 "onIIa 1 4.04 2I2Itl7t 00:00 57.1Oft o~ ~m; :=~ 0.00 0.00 0.00 ,_ WellpMh: TIe _ liD: ItIF It.,. Datum: Y.8eotlon AnsIe 350.00' - c i 1200-=- o N - - + :ë1OOO-- 1:: o z - '7'" 800- -- - .c .. ~ o -.. ~_. en 6OO-~.- --- F-04A Fault 2 1800 1400- 1600 T..... ...... ...... ....1. ....0. ·70.17 10'.... ..... ...so .n A' 745.75 Co-( (dinate ~! Reference: Well Centre: F-04. True North vr~ (V~ ~::::~: ~~~ ~~r.~)1 Measured Depth Reference: 4: 04 2/2/197100:00 57.10 Calculation Method: Mininum Curvature aECTION HTAlLa he MD ,., Ad TYD +MJ.a +EI.w D~ Trace i iæi: S:ii iitl! lliHi =r. =~ vJi Utl: ~ ,_ MAr ,_ _'M _.n _2.41 30.10 110.00 I 101$4..01 I'''' 11'.72 "'1.21 IU.I' .101.17 H.IO 110.00 · 101f'.7. 10.00 311.00 ....M ...... 'IHM HoG ,....07 , 10....11 n... _.00 ._.12 ''''.10 'H4.11 30.10 ".00 · 1011'''' UAI ".&0 ...,.., 1071.04 1t02.17 12.00 ".00 · 11:1100.00 ".00 SU.l3 It70A' .........70 IN..... 12.00 ....10 TARGET DETMS 1W ..~ +£I·W ShIipe 8&5 'mfi ~1~ =: 000 1stl55 3W2A3 PI;:ItJ9Oft ~~ ~~n~ :~¡~ ~ ~7000 1,&.c2¡a 3920A1 Pof1t .... ~5e-r' F.Q.IA hut 3 F.(WA no.' F-OtA Tt02 ANNOTATIONS TYD IID__ .571.14t_.00 ~ .587.3110010.00 KOP ._.,.,0024.00 3 1807.N 10034.00 4 "'7.29 10134.00 . .....10 t05tl.75 . ._.12 t05l8.., 7 .1183.13 1ott...' . .170.85 11_.00 TO 400--- 200---- . 2800 3000 3200 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 West( -)/East( +) [200ft/in] F-04A T10.2 I :]Jo· I - / f / ¡ ! í 1\ .~ ! ~, í 8400 'ë 8500, ~ o 'I'" 8600 - .c .. a. II a 8700 'i u :e 8800 ~ II 2 I- 8900 - - - ------- 900 1000 1100 1200 1300 1400 1/9/2003 3:56 PM 300 400 500 600 700 800 Vertical Section at 350.00° [100ft/in] 200 100 F-04A T10. o i I / J::-F--O,t{F__~ - -200 -100 -300 -400 9000 bp ) BP) baker Hughes INTEQ Planning keport H._.h_ ."____..._.. ..........____ ____~__. .-.'. -.a.. [NT EQ _.._ .______. _ _"_.__ ___ ___.___. _n_____. .._._ __u_ _ _ ...._.. ..... __ _ _~..__ _ .___ __.. ._~. ___,_.~ ...._ _ r" _" ._ ,__ __.. _._._ ... _ .~.. ____.___ ...w·_.....__,.,__....·.._..,..... BP Amoco Date: 1/9/2003 Time: 15:57:06 Page: Prudhoe Bay Co~rdillate(N"E)Refel7ence: iWåll:,F-04, TrLle North' pBFPadi ... .... ..... ... ..... .... ' . .. .......'........ ..........'.., ... ....... ...'.. . Vertical (~Vl)~efe~eJÏ~e::<iSY$t~rn:M~~nSf)atevel F-04 .' ............. '... .' ..'<ii ... ..... ..... ....>,. ...... .... ,.' ....... .. ........... .... .. SectiolI,<YS)R~f~r~.nçe:i ......... ....... ..V\lell(O.OON,O.OOE,~&O.QO~i) . :~~~~~:~;~.:.~~~~~:::":...:.::=:.:':::::;_:.:.:~:_:.::~:"::::.7:::=.:~:.:.:::=.::.:'::...::c.::::..::.~~::.:::~==~~~~~~~~~~~_~~::_~~~~~~~:.____~::~~~:~~~:~=~~:~~;:~~~:____,7_~::::~:~.~;:~:.~~~Clè Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Company: Field: Site: Well: WelJpatb: ..'............ ",....-. .........--.. Field: ...__..~._. .. .'" ._......... .. _.,.~,.._..,..."_.,..,,... ....".,~.. ~ ''''n,.''"'· '... ~ ..__ PB F Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft Site: Well: F-04 F-04 Well Position: Position +N/-S 1280.42 ft Northing: +E/-W 1025.27 ft Easting: 0.00 ft ..., ".,.. ,..~,."-'" ."...-......-.. ._..~"'_.- ..." -"~..-,~.-..",.,.--,.,-~".,-.,,.-. 5972527.29 ft 650960.70 ft 5973827.99 ft 651959.92 ft Map Zone: Alaska, Zone 4 Coordinate System: Well Centre Geomagnetic Model: BGGM2002 .. ._,_ ,.,__.".._......~ ..H_..... ... _...,. "''''~'''''_' ...."......,..'. ,_"._ ......,..._,.__ __. ..__~..,,"....._.. .' ....,'., ..'n......_".,...~.....__...._,.__., ..__._,~_"_._.."_,_,_"".,,_,.·.w,..._..,,_._,,..,,.._.,_,,_. . . '·"H·m.. _.._..._,..,..,.,.~.".__ _On. .__,..,._~_.,',..._ "_.. ..."...n....__.______........,__...._..._._,......___..__..n_," ._.,__~, _~__,,__...._,_.."~.__.._..._._,.. .. . '''._,.~,.._"_.......,,_.. '. Well path: Plan#10.1 F-04A 500292008901 Current Datum: 4 : 04 2/2/1971 00:00 Magnetic Data: 1/9/2003 Field Strength: 57536 nT Vertical Section: Depth From (TVD) ft 0.00 ... ".--.. -"...._"._.-....~ ,--.... ._-" .-.~"-,-'. Targets Height 57.10 ft +N/-S ft 0.00 ._, , ,._,,-,~....---,..... .".._.,,~.., -." --....,-....". "-'-""""'--'~'''''-- Latitude: Longitude: North Reference: Grid Convergence: 70 19 55.283 N 148 46 31.468 W True 1.15 deg Slot Name: 04 70 20 148 46 7.875 N 1.527 W - ' --,-,-,.""_.,_._-.-..,, -_...-- ... .... ..- .......'-"-...,,_.._,..._,_..~.._,,. .-,.-....- .. '.. .R_"._'."._.'R...... .. .~,..,.,_..._.,,,._ .__,~._~~ .~_.."~_,,,._. _._,.."..,"~"___". .."'....,_.~.._..~...._._,_ ....,~_.._....__._,...____._..__._,.,.,'_..._ 5974275.00 655330.00 5974275.00 655330.00 5975080.06 655734.89 5975450.00 655920.00 5975450.00 655920.00 5974850.10 656640.08 5974600.00 656190.00 5974600.00 656190.00 5975080.03 656424.94 5974630.00 655950.00 5975350.00 655850.00 F-04 10010.00 ft Mean Sea Level 25.96 deg 80.83 deg Direction 350.00 70 20 11.592 N 70 20 11.592 N 70 20 19.426 N 70 20 23.026 N 70 20 23.026 N 70 20 16.979 N 70 20 14.612 N 70 20 14.612 N 70 20 19.284 N 70 20 14.956 N 70 20 22.057 N .. ._.~.._"~"_....,.....,,_..,-'...""~.,-~,-......_.._,~-,,.,....-, '-",.'~'."~_'''_' .~... . .,'... ~'''''''',-.'- --_._.~ '""-,..~. 'f"'"'-'~.'--"-'":"' ..".,--:'-."-_._..~.."_._~.,"~.."...,~..". ,--..,.-...,... .~..'""_..~._,.."",.._.....__...-_......._,_.""~.._._,...........---_.._._-. ._....._.,-...~...._~-~-'_.~......_."'_...~-'':'"'"-,...,'-.-_."._-'~.~' .._-_._-:-~~"....,._-,--,..-..._".~. ,..... -. . Latitude: Longitude: Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 M~p . '.. ..... Map> ..... ~....-. I.at~tude;~i.<·+i...()~gitu~~....-> . ~~;;;...____..:._:.._~=~:~~~.....:;;.."..:..._:~~~:..,. .....~~.~:!!~~~~.~",.:..:.:~:~:::.~..,.;_.,....~:~.~~~~..._.~.~.e~.~.__....._.:_;~:~:.~·~::.,...:_s.e~...,...... ...... 0.00 1446.22 3760.43 5975350.00 655690.00 70 20 22.090 N 148 44 11.688 W 0.00 1446.22 3760.43 5975350.00 655690.00 70 20 22.090 N 148 44 11.688 W 0.00 1470.98 4021.00 5975380.03 655950.00 70 20 22.332 N 148 44 4.077 W 0.00 733.16 4151.19 5974645.06 656095.10 70 20 15.075 N 148 44 0.286 W 0.00 525.94 4507.12 5974445.11 656455.13 70 20 13.035 N 148 43 49.894 W 0.00 197.83 4160.42 5974110.06 656115.17 70 20 9.810 N 148 44 0.025 W 0.00 458.63 3875.59 5974365.02 655825.14 70 20 12.376 N 148 44 8.339 W 0.00 1044.46 3842.37 5974950.01 655780.06 70 20 18.138 N 148 44 9.301 W 8960.00 8970.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 378.66 378.66 1175.41 1541.55 1541.55 927.14 686.19 686.19 1161.40 ..". ...._.___u,._ """'_'~" ......_._. Name Ö~¿~ip~i()~ . ..._:,......,_'.."9.!.~:.^..:.:~ ".'...i.._.~.iE~_..,.~_._ F-04A Polygon5.1 -Polygon 1 -Polygon 2 -Polygon 3 -Polygon 4 -Polygon 5 -Polygon 6 -Polygon 7 F-04A Fault 1 -Polygon 1 -Polygon 2 F-04A Fault 2 -Polygon 1 -Polygon 2 F-04A Fault 3 -Polygon 1 -Polygon 2 F-04A T1 0.1 F-04A T1 0.2 721.05 1442.98 3378.70 3378.70 3799.85 3992.43 3992.43 4700.26 4245.17 4245.17 4489.80 4005.81 3920.41 148 44 22.852 W 148 44 22.852 W 148 44 10.541 W 148 44 4.910 W 148 44 4.910 W 148 43 44.246 W 148 43 57.542 W 148 43 57.542 W 148 43 50.389 W 148 44 4.532 W 148 44 7.015 W bp . BP ) bJker Hughes INTEQ Planning Report ... .... 1:~l""rEQ _.~.....~,.,.~,.__.~.~.__.__.,~"... ....__..._,..._",_._,_..w..~_~....:_..........,....,_~.,____.".._.. ...~,___._.._'..."...._..._'._.....__,__....-_ ..,.........--..-.....-,...........-........-..--.....-....-..--'.-.-....-........_......-. ..~_..,"..,,'.,..,.,,_..-.,'_.'~.,_._. . . ._., "".. _''-'" ."."."...,~ ."............_'_....,."...,," -"..._- ,_.... ...:"""__....'-:-.:'".,.,,~_'_...~..._.'""_... ''''''''1' '"[""'..-......."';"......'... -:-'''-,.,,,.'.,,.... '··"·w .--.....,'~.... Date: ,'1/9/2093........ .. .... '.. .......... .·...·,.·'firn¢;: ..·.t5:57:06 Page: Co~rdi~at~(NE)R~fere~ce:Wen: F-04,TrueNprt~ ..' yel'*~'(Tvn)Rêf~~e..ce: $yst(:)rn: Mean SeaLevel "Seçtio,n(YS) Refer~Dc~: ..,..... .... ..,"V~H(0·.00N,0.OOE.350;OOAzi) .,.-".;....;~_'-'..... ;,_,.__",.,_"..,;__~~~!~;S.,~~~~I;~~~~_~~t_~,~.~:_--:..__.,~~~!~~~E~.~~~t~!.l:,c.~__,_;.-'_,J?~.:_._.<'.~~~':!... ... Company: BPAmoco Field: Prud~o~Bay Site: PB FPad Well: F-04' ..~!~~~tt!~~..._~_I~~~.~~:!..~~~.~_..___.._..,'~......_..._....."_._ Annotation 2 ft 10000.00 10010.00 10024.00 10034.00 10134.00 10519.75 10588.61 10918.61 11300.00 8579.14 8587.32 8599.15 8607.98 8697.29 8959.90 8960.12 8963.93 8970.65 TIP KOP 3 4 5 6 7 8 TO Plan: Plan #10.1 KO moved higher to increase stand off from 23 Principal: Yes Date Composed: Version: Tied-to: 1/9/2003 1 From: Definitive Path Plan Section Information " . ___" , ~" .. "~'~""":, "~i"" ~.:--' "..~......, .,.....,~'"..:..~ :'-:'.... ..,.~.,..... .':-...:~' .'7-:""":"':' "~' "7':":" ",~"'_:."""c_-: .. '-:"_",~' ..- ," ..~_"...':".._',.._,.".. '_','~:_ ,;-_."r'_r' .._,.~.....~.._ ....,... ~'" ..--:-"--:: ',".~""-_''':''''_''' ~.~~-_..._~. __,. .:~- ::':""."'~. .;'"._~." ...,,~, ""':."". ....,.,':"""-, ·,,·,,~.,··':"":''"..·_-,-.."ë..~·'--:M_:. .";',..~-,~~..."~-",,, --"" ~~,,~ ~".,-. ~:"~_._" .,"'~-- '-'.""~"-'-.~--" - "'."0:-""-'" 'h' ". _.. ,"'._" ...-...,.".. ,~, ... .-'. "" MD Inçl . Azina 'TV» '-I-:N/"S +EI;':W ·DLS ,. Build Tûrn TFÚ 1'ar~et' _................"~_.......__....._~:~~_.. _:__....:_~e.~__.~__:...:._;~_:._'''''_.~._..,_._~.....".:.__..._,..~.,~~..::.;.,_...:.,-'"._~..:",.-'~.:.,;-:.:.;.......:.~~;~~!J.P2!!~~~.g!!9_~.~~~.~BP~.;.:.L.._~~~_.._..."._.__:..........._..:....::..c..;,:.;... ,.......".....,.......-... 10000.00 35.18 104.33 8579.14 652.23 4065.08 0.00 0.00 0.00 0.00 10010.00 35.12 104.34 8587.32 650.80 4070.66 0.60 -0.60 0.10 174.52 10024.00 29.52 104.34 8599.15 648.95 4077.91 40.00 -40.00 0.00 180.00 10034.00 26.47 104.34 8607.98 647.79 4082.46 30.50 -30.50 0.00 180.00 10134.00 31.93 168.72 8697.29 615.57 4109.87 30.50 5.46 64.38 110.00 10519.75 90,00 319.00 8959.90 688.59 3938.86 30.42 15.05 38.96 146.07 10588.61 89.64 340.00 8960.12 747.60 3904.11 30.50 -0.52 30.50 91.00 10918.61 89.09 19.60 8963.93 1071.04 3902.97 12.00 -0.17 12.00 91.00 11300.00 89.00 333.83 8970.65 1441.70 3881.68 12.00 -0.02 -12.00 -90.50 Survey MD ft 10000.00 10010.00 10024.00 10025.00 10034.00 _.'. _n.. _ ..... ... __.. _.. . .___ _~. _, _"-:' _, .~,..~.._,...'" "_..._~._.._..~ .... ~_..," _ .'c" .._."'_ '''.:.''~_''~"...".,~"._. ,..': .....~."_'_"~u..._~....,__.._._.~.:-:-_..;~..,_. ._.~-'_....-_._._.-:- _.._.".~'-,...."..~--,.,.~.""-,-,.. ..-. --<" --' --.-."...~-...... ,,~..~. ...-." -,',,' .", "."....." ,,~. -. . ~ "". . Incl Azim .~:~......._._-_......~~~.;_..- 35.18 104.33 35.12 104.34 29.52 104.34 29.21 104.34 26.47 104.34 SSTVD N/S EIW MapN'MapE VS DLS TFO Tool ft ft ft iff.. . ft ....... .... ft .. degl100ftdeg ...... '" _ ","'~, ;.. ",.. ,.~;, .." ""...:'..~.. ,,,.~ ",. ,,,_,_. ._'." "..'.,~_. '""".., J.. ._._...;,.~"~"..: "...~¡ .,_ .._:. ...__ _ "._.,,,___.._' ~""."". :_..... .. ".:...,..;,... __'~'" .... _ ...._'"".. ~._ _'.. ~~. ~.._._.,~ ,~.._..__, ,.~._.' ,-~~ .-.-.,.. .,1.... '...~ ......, -..'....."'-.....--'- :.~ .-.-...'. ,_.~ ....,..,_. ;,,- .._....;'-....'...........;..'-~....;~.... _...... ..',,',.. ..'_.....,.... '. 8579.14 652.23 4065.08 5974562.40 656010.65 -63.58 0.00 0.00 TIP 8587.32 650.80 4070.66 5974561.09 656016.26 -65.95 0.60 174.52 KOP 8599.15 648.95 4077.91 5974559.38 656023.54 -69.03 40.00 180.00 3 8600.02 648.83 4078.39 5974559.27 656024.02 -69.24 30.50 180.00 MWD 8607.98 647.79 4082.46 5974558.31 656028.11 -70.97 30.50 180.00 4 10050.00 25.19 115.16 8622.38 645.45 4089.00 5974556.11 656034.70 -74.40 30.50 110.00 MWD 10075.00 24.91 133.22 8645.07 639.58 4097.67 5974550.41 656043.48 -81.69 30.50 100.25 MWD 10100.00 26.75 150.26 8667.60 631.07 4104.30 5974542.04 656050.29 -91.22 30.50 83.87 MWD 10125.00 30.33 164.42 8689.58 620.09 4108.80 5974531.16 656055.01 -102.82 30.50 68.51 MWD 10134.00 31.93 168.72 8697.29 615.57 4109.87 5974526.66 656056.17 -107.46 30.50 56.05 5 10150.00 28.01 174.51 8711.15 607.67 4111.06 5974518.79 656057.52 -115.44 30.42 146.07 MWD 10175.00 22.57 187.03 8733.76 597.05 4111.03 5974508.17 656057.71 -125.89 30.42 141.05 MWD 10200.00 18.60 205.64 8757.18 588.68 4108.72 5974499.76 656055.56 -133.73 30.42 129.71 MWD 10225.00 17.18 230.15 8781.01 582.71 4104.15 5974493.70 656051.12 -138.82 30.42 112.26 MWD 10250.00 18.87 254.30 8804.81 579.25 4097.42 5974490.10 656044.46 -141.06 30.42 88.90 MWD 10275.00 23.01 272.30 8828.18 578.35 4088.63 5974489.02 656035.69 -140.42 30.42 65.90 MWD 10300.00 28.54 284.38 8850.70 580.03 4077.95 5974490.48 656024.98 -136.91 30.42 49.06 MWD 10325.00 34.81 292.61 8871.98 584.26 4065.56 5974494.46 656012.50 -130.59 30.42 38.16 MWD 10350.00 41.48 298.54 8891.63 590.97 4051.67 5974500.89 655998.49 -121.57 30.42 31.14 MWD 10375.00 48.39 303.07 8909.32 600.04 4036.55 5974509.65 655983.18 -110.01 30.42 26.47 MWD 10400.00 55.44 306.71 8924.74 611.31 4020.44 5974520.59 655966.85 -96.12 30.42 23.26 MWD 10425.00 62.57 309.77 8937.61 624.58 4003.63 5974533.52 655949.78 -80.13 30.42 21.01 MWD 10450.00 69.77 312.46 8947.70 639.62 3986.43 5974548.20 655932.28 -62.33 30.42 19.43 MWD 10475.00 77.00 314.91 8954.84 656.16 3969.12 5974564.39 655914.64 -43.04 30.42 18.34 MWD 10500.00 84.26 317.22 8958.91 673.92 3952.03 5974581.79 655897.19 -22.58 30.42 17.64 MWD 10519.75 90.00 319.00 8959.90 688.59 3938.86 5974596.20 655883.73 -5.84 30.42 17.26 6 10525.00 89.97 320.60 8959.90 692.60 3935.47 5974600.14 655880.26 -1.31 30.50 91.00 MWD bp _..._u _.~.,._. ._". ._._..... ........__..~.~_.__ _"_"_'_'___~'."____'_'" , BP ) bJker Hughes INTEQ Planning képort 8A ~·'.I IS ..-....~_._----:-..,... .--- ....:- -...-. .-.--,----..----:- - ~~-~.,......._._--;-._-- :--~ ._..,.._.~ ._~-_._.__...---:-_.-:--._-;-..._--.~-:"'----_.-.-. ---....;--- ~-_.._"....-._-. ..-. ~. -_..~.-._._-- -_...:~.,..__.- .----.- ._._....__..~ .""...",. .--...- INTEQ 8960.19 8960.37 8960.57 8960.79 8961.03 8961.30 8961.58 8961.88 8962.20 8962.54 8962.89 8963.26 8963.64 8963.93 8964.04 8964.44 8964.86 8965.29 8965.72 8966.16 8966.60 8967.05 8967.51 8967.96 8968.41 8968.87 8969.32 8969.77 8970.21 8970.65 MD loel AziQ1 SSTVD N/S ... .~.........._.,.~..,.J..~_.~~~"... .~....L".'~~'..'_.'.".__."_"~.".."..,:.,,._._......,,.:_..,...~_,:;.......,...... 10550.00 89.84 328.22 8959.94 712.92 10575.00 89.71 335.85 8960.04 734.99 10588.61 89.64 340.00 8960.12 747.60 89.62 89.57 89.52 89.47 89.42 89.37 89.33 89.29 89.25 89.21 89.17 89.14 89.11 89.09 89.08 89.06 89.03 89.01 89.00 88.98 88.97 88.97 88.96 88.96 88.96 88.96 88.97 88.98 88.99 89.00 341.37 344.37 347.37 350.37 353.37 356.36 359.36 2.36 5.36 8.36 11.36 14.36 17.37 19.60 18.83 15.83 12.83 9.83 6.83 3.83 0.83 357.83 354.83 351.83 348.83 345.83 342.83 339.83 336.83 333.83 758.34 782.23 806.47 831.00 855.74 880.63 905.61 930.61 955.54 980.36 1004.98 1029.35 1053.39 1071.04 1077.07 1100.93 1125.15 1149.66 1174.38 1199.27 1224.24 1249.23 1274.18 1299.00 1323.64 1348.02 1372.09 1395.76 1418.99 1441.70 - ,.. _"..q.,.._....." ._'...._... ....__.u..__. Company: BPAmoco Date:· .1~9/2003. ..... .... Time: 15:57,:06 Page: 3 Field: prqdl'1()eßaYCø~rdall~te(N:Jji)~~fer~oee: ··VV~II;F~O~,Tr4~ Nort~ Si.te: PB F·· PadYertiç.I'(T"\TD~~ef~~~~~~:· S~t~rn:. ty1ea~.Sea Level Well: F-04.··.·, .......'...... ..... ... ~e~ti~n<YS)'R.~f~~en~e:.:· Well (Q.OON,0.00E,350,00ÄZi) -_.! ~.~!~~~~c:....._~~~:~~,~_~:~.£~£1,~~;_:_:,._,...._.._.. ..;...._..._._.;:__"~,_c-,_".._..~._....___.,..,.~_.._..,'-C:~~!!~r.£~!~~!.~~!~_~,~~..!~~_~:.,._~~i_~~~_S~_~~~~[!:.,..~._.......,.:~~_~__...2~~:~1~_..... 10600.00 10625.00 10650.00 10675.00 10700.00 10725.00 10750.00 10775.00 10800.00 10825.00 10850.00 10875.00 10900.00 10918.61 10925.00 10950.00 10975.00 11000.00 11025.00 11050.00 11075.00 11100.00 11125.00 11150.00 11175.00 11200.00 11225.00 11250.00 11275.00 11300.00 Survey . ---".-.- ~-""----:-;_. ·___···....________·____'___......,____-:-:~.'..-~.~.-'-.--.~n.~~---~..,.'.....~." ·._'_.~_.....~_.__.._...".<_._'.....9___._...............,-".-____......~-...",..-........-_..-.....-'~".........-----~---.-...-,~"_,....,._... -:___. ___........_.__.__.__ ___,_.._.._____ '" ".,_'__....__._'_..':'__'_....,_'___."....__._'_..~..,_._;._. "'0'''''' ..... EIW :MapNMapEYS DLS 'fFO. Tool ._..~,...__:.,"._...._...._"..;._.,._~.~_:,.....:....;.__.....__..,;.......~_~"._.,_....,._:...:..,_,_.:....~..".".~.........,..~:~t~;..~_~_.....__,.~.~~__..:...:.,..._......._..:... ..... .. 3920.94 5974620.15 655865.32 21.23 30.50 91.00 MWD 3909.22 5974641.98 655853.16 44.99 30.50 90.99 MWD 3904.11 5974654.48 655847.79 58.30 30.50 90.96 7 3900.34 3892.98 3886.87 3882.05 3878.51 3876.27 3875.34 3875.72 3877.40 3880.39 3884.67 3890.24 3897.07 3902.97 3905.07 3912.52 3918.70 3923.61 3927.24 3929.56 3930.57 3930.28 3928.68 3925.78 3921.58 3916.10 3909.34 3901.34 3892.11 3881.68 5974665.15 5974688.88 5974712.99 5974737.41 5974762.07 5974786.92 5974811.87 5974836.86 5974861.83 5974886.70 5974911.40 5974935.88 5974960.05 5974977.81 5974983.89 5975007.89 5975032.22 5975056.82 5975081.62 5975106.54 5975131.53 5975156.51 5975181.41 5975206.17 5975230.71 5975254.98 5975278.90 5975302.41 5975325.44 5975347.94 655843.81 655835.96 655829.37 655824.04 655820.01 655817.27 655815.83 655815.70 655816.88 655819.36 655823.15 655828.22 655834.56 655840.10 655842.08 655849.04 655854.73 655859.15 655862.26 655864.08 655864.59 655863.79 655861.69 655858.28 655853.59 655847.61 655840.37 655831.89 655822.19 655811.30 69.53 94.34 119.27 144.26 169.24 194.15 218.91 243.46 267.72 291.64 315.15 338.18 360.67 377.03 382.60 404.81 427.58 450.86 474.59 498.69 523.11 547.77 572.61 597.56 622.55 647.52 672.39 697.10 721.57 745.75 . __....... ,_._. . _m_.un__ 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 91.00 MWD 90.99 MWD 90.97 MWD 90.95 MWD 90.92 MWD 90.89 MWD 90.86 MWD 90.82 MWD 90.79 MWD 90.75 MWD 90.71 MWD 90.67 MWD 90.62 MWD 90.58 8 269.50 MWD 269.51 MWD 269.56 MWD 269.61 MWD 269.66 MWD 269.71 MWD 269.77 MWD 269.82 MWD 269.87 MWD 269.93 MWD 269.98 MWD 270.04 MWD 270.09 MWD 270.15 MWD 270.20 MWD 270.25 TD / ... TOTs ....................... '. / ........................ Mud Cross TOTs ......./......,' ............ '. / .......,........ BAG 1/27/2003 ") Flow Tee 2" combi ram/slips middle of pipe/slips 2 3/8" ram middle of blind/shears ,--.01 .o--J' Mud Cross middle of flow cross ~ ~ - 2" combi ram/slips middle of pipes Blind/Shears middle of slips btlm of bag top of bag s- a> en -- a:: All Measurements are from top of Riser '" ) f ') ) ~ U· r fA\ lTr ~c .'0) .' I p\ I ,r~ cQ.. J LJ 1.J..J ':.'J r'~ r[ I ~). I·r=¡ ~. '~I l.:;)u lÃ'\ r· } If;\ (~ ooV1/^\ ILl. U\,\ h\ tJ\ Lrll ._l.:1 [r\\ c.º) L: \J, LJ-Ù TONY KNOWLES, GOVERNOR AI1ASIiA. OIL AND GAS CONSERVATION COMMISSION 333 W. -pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Ted Stagg CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Prudhoe Bay Unit F-04A BP Exploration (Alaska), Inc. Permit No: 202-100 Sur Loc: 2308' NSL, 2396' EWL, Sec. 02, TIIN, RI3E, UM Btmhole Loc. 3572' NSL, 995' EWL, Sec. 01, TIIN, RI3E, UM Dear Mr. Stagg: Enclosed is the approved application for permit to redrill the above referenced well. The pennit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, CJM &I~.~ camm~eChs!i Tay!ór Chair BY ORDER OF THE COMMISSION DATED this~ day of May, 2002 jjc/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. 12. Distance to nearest property line 13. Distance to nearest well ADL 028277 1701' M D No Close Approach / 16. To be completed for deviated wells Kick Off Depth 10150' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Casinq WeiQht Grade Couplinq 2-3/8" 4.6# L-80 ST-L Hole 3" o STATE OF ALASKA ALASKA Oi_-ÅND GAS CONSERVATION COMMIS, PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil o Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool KBE = 57.1' Prudhoe Bay Field I Prudhoe 6. Property Designation Bay Pool ADL 028280 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number ./ F-04A 9. Approximate spud date 05/15/02 / Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 11250' MD I 8971' TVDss 17. Anticipated pressure {S~20 AAC 25.035 (e) (2)} 90 0 Maximum surface 2216 psig, At total depth (TVD) 88001 / 3272 psig Setting Depth Top Bottom Quantity of Cement Lenqth MD TVD MD TVD (include staqe data) 2690' 8560' 7398' 11250' 8971' 49 sx Class 'G' ~A- s/bIOL. hN -s: ~ ,~ 1 a. Type of work 0 Drill II Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2308' NSL, 2396' EWL, SEC. 02, T11 N, R13E, UM At top of productive interval 2972' NSL, 1132' EWL, SEC. 01, T11 N, R13E, UM At total depth 3572' NSL, 995' EWL, SEC. 01, T11 N, R13E, UM 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 10676 feet 9204 feet 1 0561 feet 9105 feet Length Plugs (measured) Junk (measured) IBP Packer rubbers and bands at 10561' Size Cemented MD TVD Structural Conductor Surface Intermediate Production Liner 96' 2004' 9312' 30" Cemented 18-5/8" 9200 sx Permafrost II 13-3/8" x 9-518" 2410 sx Class 'G', 1775 sx PF II 96' 2004' 9312' 96' 2004' 10665' 9-5/8" X 7" 460 sx Class 'G' (Liner Tie Back to Surface) RECE>i6VED Ivl (\v Un ? ?Q02 ~ lr-\! 1- £... . 20. Attachments Open: 10394' - 10404', 10440' - 10490' Sqzd Intervals: 10193' - 10490' true vertical Open: 8963' - 8972', 9002' - 9045' Sqzd Intervals: 8795' - 9045' 1m Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program 1m Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Ted Stagg, 564-4694 21. I ~erebY certify that t~ forj9~e and correct to the best of my kn~~ledge . Signed Ted Stagg ~ ~1 Title CT Dnlllng Engineer Commission Use Only. , Permit Number . API Number Ap~· Pfi1?1 n See cover letter .2,.,02- - /C) ð 50- 029-20089-01 ) / {l)(/" for other requirements Conditions of Approval: Samples Required 0 Yes ~o Mud Log Required D. Yes ~ No Hydrogen Sulfide Measures Ji'Yes 0 No Directional Survey Required -..,g,Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 151<" 0 3.5K psi for CTU Other: TtØà@ba1 S~ tø 3~~/o fJ k'. \d'~,,+- Approved By Cammy Oechsli Taylm O~riG'OrEf\\ I A I~:eo:~::~sion Date .c; / ~0!f Form 10-401 Rev. 12-01-85 1\ i \J' L '¡~mlt'jnl.TnPllcate Prepared By Name/Number: Terrie Hubb/e, 564-4628 Perforation depth: measured Alaska Oil & Gas Cens, Clj¡¡¡¡ÏII~~.;ml An(;ho(~cw Date ç/~f'1-- ) ) BP F-04a CTD Sidetrack Summary of Operations: A CTD through tubing sidetrack is planned for F-04. The coil sidetrack, F-04a, will exit the 7" liner in Zone 2 and target Zone 1 B. F-04a will be completed with a fully cemented 2 3/8" liner. The existing F-04 perfs will be cement squeezed with a 17 ppg slurry desiged to be used as a cement ramp for the F-04a window. To prepare F-04 for the sidetrack, an X nipple in the production packer seal stem at approx. 8581' will be milled from 2.313" 10 to 2.75" 10. Additionally, the X-O from the production packer mill out extension to the 2 7/8" tailpipe will be milled such that the 2 7/8" tailpipe will be dropped off and chased to TO. With a recent TO tag at 10,510" , there is ample room for the 2 7/8" tailpipe in the 7" liner sump. One fault, 15-25 ft throw, will be crossed in the horizontal section of F-04a. This fault orientation and throw suggest a minimal risk of lost circulation but may present a geosteering challenge in re-Iocating Zone 1 B on the far side of the fault. Phase 1: Prep work. Planned for May 7, 2002. 1. Service coil to mill XN nipple and X-O ~ove tailpipe, push tailpipe to TO. 2. Service coil to lay approx. 25 bbls 17 ppg cement to shut off perfs and provide a cement whipstock ramp. I Phase 2: Mill window, Drill and Complete sidetrack: Planned for May 15, 2002. Drilling coil will be used to mill the window then drill and complete the directional hole as per attached plan. Maximum hole angle will be 91 degrees. Mud Program: · Phase 1: Seawater /' · Phase 2: Mill with seawaterlbiozan, drill with Flo-Pro (8.6 - 8.7 ppg) Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. / · All Class I wastes will go to Pad 3 for disposal. Casing Program: The production liner will b;ë 3/8" ST-L from TO to approx. 8560'MD (7398 'ss). The liner will be cemented with a minimum of 10 bbls to bring cement up to approx. 1 O,OOO;,or about 150 ft above the window. Well Control: · BOP diagram is attached. /' · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2500 psi. Directional · See attached directional plan. Max. planned hole angle is 91 deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · MWD Gamma Ray will be run in the open hole section. Memory CNL will be run inside the liner. Hazards / · The maximum recorded H2S on F Pad is 30 ppm on well F-43. . · Zone 2 conglomerates may cause slow ROP, possible bit damage. · One small fault mid-polygon may cause lost circulation. ') ) Reservoir Pressure Res. press. is estimated to be 3272 psi at 8800'ss (7.2 ppg emw). Max. surface pressure with gas (0.12 psi/ft) to surface is 2216 psi. I TREE = 6" CnN , WELLHEAD = McEVOY ÄcrÜÃrÖR;; ·····Ofi5 .",..,'..,,,....,,,,,,.,,,,.,,,,.,,,.,.,,,,,..,,,,,.,.,,,. ,,,,,,,,,,,.,,,,.,,,,.,,,,.,,',,,,-,,."'"'''''''''''' KB. ELEV = 57.07' .".,,,.,,_.,,,,..,,,.,..,-~,,,,,,'..,,,',,",,",.,.",,.,..'"'' BF. ELEV = 39.17' KOP = 3000' """..,,,,..""""""""""""'''"''''''''''''''''''''''''''',,,,." ~x Angl~ = .. ,'. 40~.~999: Datum MD = 10303' Datum TVD = "ããõáSs 14-1/2" TBG-IPC, 12.6#, L-80, ID = 3.958" l-i 19-5/8" CSG, 47#, NSCC, ID = 8.681" l-i 113-3/8" CSG, 72#, N-80, ID = 12.347" l-i ) F -04A Proposed CTD Sidetrack SAFETY ~'''''\ES: COMMUNICATION IN 18-5/8" X 13-3/8" ANNULU~ JLED WITH CRUDE) NO LATCH ON VALVE AT GLM #3. - 1965' C K 2000' 2022' ~ L - I Top of 2-3/8" liner l-i 13-1/2" TBG, 9.3#, L-80, ID = 2.992" l-i ,z '3 8560' 8583' 17" TBG, 26#, L-80, ID = 6.276" l-i 1 TOP OF 7" LNR l-i 8642' I X 8642' II I 9-5/8" CSG, 47#, N-80, ID = 8.681" l-i 9312' µ ÆRFORA TION SUMMARY REF LOG: SWS BHCS (RUN2A) ON 03/14/71 ANGLEATTOPÆRF: 34 @ 10193' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 4" 4 10193-10221 cmt'ed 07/25/98 4" 4 10261-10296 cmt'ed 07/25/98 4" 4 10310-10325 cmt'ed 07/25/98 4" 4 10332-10374 cmt'ed 07/25/98 4" 4 10386-10404 cmt'ed 07/25/98 2-1/2" 6 10394-10404 cmt'ed 03/16/02 2-1/8" 6 10415-10430 cmt'ed 07/25/98 2-1/8" 4 10430-10454 cmt'ed 07/25/98 2-1/8" 4 10440-10490 cmt'ed 08/06/98 2-1/8" 6 10454-10479 cmt'ed 07/25/98 2-1/8" 4 10479-10490 cmt'ed 07/25/98 1901' 1-i4-1/2" OTIS -XLB SSSV LAND NIP, ID = 3.813" I I 1965' /--1 2000' '-1 2022' ST MD 7 3715 6 5006 5 5887 4 6543 3 6891 2 7204 1 7326 II I x- j--1 .. I PBTD 1-1 10561' 17" LNR, 29#, N-80, ID = 6.184" l-i 10665' DATE REV BY COMMENTS DATE REV BY COMMENTS 06/26/76 ORIGINAL COMPLETION OS/26/87 LAST WORKOVER 02/08/01 SIS-MH CONVERTED TO CANVAS 07/17/01 RNfTP CORRECTIONS 03/16/02 CWS/tlh ADD PERFS 1-i4-1/2" X 3-1/2" XO I l-i 9-5/8" x 7" XO I l-i 13-3/8" x 9-5/8" XOI GAS LIFT MANDRELS TVD DEV TYÆ VLV LATCH PORT DATE 3599 30 FMH-O BK-2 4598 47 FMH-O BK-2 5275 49 FMH-O BK-2 5781 48 FMH-O BK-2 6048 45 FMH-O BK-2 6289 48 FMH-O BK-2 6383 49 FMH-O BK-2 8492' 1-i3-1/2" OTIS XA SLIDING SLV, ID = 2.75" 1 8542' 8583' - 7" Otis PKR w / X(HCL), ID=2.75" (milled to 2.74" ID) - ;;j-lt[ X ¿-(/~" xu (milled) 8641' l-i 9-5/8" TnN SN-6 PKR I 9876' l-i MARKER JOINT I 10000' l-i Top of Cement 10150' l-i Cement Ramp Window I /'0 bb~s 1 2-3/8" cmt'ed and perfed 10460'? l-i Tailpipe milled off and dropped 1 10561' l-i IBP PKR RUBBERS & BANDS I PRUDHOE BAY UNIT W8...L: F-04 ÆRMIT No: 71-0020 API No: 50-029-20089-00 Sec.2,T11N, R13E BP Exploration (Alaska) BP Amoco P.,...t W..upatlll Tie o. MDt WELLPATH DETAILS PI..Ø F~ 80011200110' F..... 10100.00 RItI· Rat. Dat..,,: V.s.ctloa .....1. Nordic 1 .1 ø.. 2/211.7100;00 O.':f~ ~~:; :=~ 31'.00' 0.00 REFERENCE INFORMATION co-ordinate~lE) Reference: Well Centre: F-04. True North V~~bn (Vg¡ ~:::~:~~: ~~t~~ roe~J.gaoÕ~)1 Measured Depth Reference: 4: 04 212/1971 00:00 57,10 Calculation Method: Minimum Curvature alcnON DETAR.& aLeg TFace Tatle' · 10100.00 304.00 104.00 ,,'t.5t 612.21 411137 i 0.00 ..11M.Ot 2 t 01 5G.00 :w.OO 103.60 ..12." 5!1r 411ÞO.153 ...... -U51.12 3 10,.400 28.10 105.84 ....... 4117.58 170.00 ..1155.8-4 4 10117.80 11.00 UI.55 ..,15.7. 42to.15 110.00 ..1184..41 · ~mi:5 =:~ 221.51 aal2.43 42'12.18 .....00 ..11 13M 8 107.21' ..,4.... :::::; 4O:n." ...00 ..ID5ðA3 7 e." oan.20 3I1S." ... 00 .e7f.U 8 ~~rs::: =:~~ UI.D7 ..12... ~ ::::~ U,'&.21 ·00.00 -503.42 · 11.41 &.'1.21 :1177.58 00.01 -421.84 ANNOTATlONI TVD liD Aft.otatio_ IU1,,1 10100.00 TIP 1172..1 10180.00 KOP ......2 101M.OO , 1711.71 10187AO 2 ..12.12 10:n7.10 2 1174.U 10172... : ..71.20 10170.00 1172.21 11OM.00 I 1171.21 11250.00 TD ----- ~---- 8350 8400 8450 8500 : - .5 8550 ì 8600 - J: 8650 . .. Do a. 8700 . a 'i 8750 CJ :e 8800 a. > 8850 a. ~ 8900 8950 9000 9050 9100 ' F-04 If':04) +£loW SI",ape ~ERr1 r~~~ ~illü ~H er -~ I !.:...: , . ~ :!L ~··I. . F-<l4A T5.1· I re.. ..... LEGEND F-<l4 (F.Q4) PIan#5 F-04A Plan #5 T ^M ! é Direct: (907) 267-6613 E-mail: brij.potnis@inteqcom Baker Hughes INTEQ: (907) 267-6600 Obp h~TEQ Plan: Plan #5 (F-04/Plan#5 F-04A) Created By: Brij Potnis Date: 4/18/2002 Azimuths to True North Magnetic North: 26.34· Magnetic Field Strength: 57502nT Dip Angle: 80.82· Date: 4/1812002 Model: BGGM2001 Contact Information: 180D-=:-- .~-==------ 1900 =---:~. -----~~~- ------~----- 1700-..:-:..::-_~~ 1600-:~---~ -- -----------~- 15O<r~ ë'140<>-::~~_ æ 1300 ~. .----=---~ o ~ 12~_ - +1100 .::._ :ë 1:: 1 000-~ ---====._ o _ ~9~::::. . i 800-=-·~ :s o en --- - ------- ~-_._- ~--- ------------ ----~- ------ -- : F:04A PoIygon5, 1 c---- -- - .. ···.:.~~-~1"<2 . __, -c=CC= ~"" -c=~~ '~~= C='-_ -- --- ---.------ -- - --------- - ------- -~ --- - ------ '-' --- - ------ - - -- --- ----.------ - ------- 70()------ ---~.., 600j:-~ - --- - ----------- -- -- ----- ----~-- ------------ ----------------- - -- - ----- 500- =-::=::::--~ ___.___, 40o---~~__==== 3oo-=-----~· 20~~_ ----~--- 2800 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000 5100 5200 5300 5400 West(-)/East( +) [100ftlin] --~- - - -- --~-~- --------------- -" ---~---- -------- --------~- ------~_._----- ---------- ----"-~ - - ---"- ----- -~---------- ----------- . ~===____:...---;:::n.== : -.lIE ---~- -- -~~---- --- --. - -------- - .--~------ ------- ---- ---- _------; PIan#5 F.Q4Ai - -;';.IQ.: ------ ._---1,._ .____ -------- - ----~----------- -------- ¡ F-<l4A T5,2 , --- -----~-----~ -- --------"----- ---- ---- - ---- ---------------- ------------------~~----- - -------------- --- ------- - ---------"--- -1350-1300-1250-1200-1150-1100-1050-1000 -950 -900 -850 -800 -750 -700 -650 -600 -550 -500 -450 -400 -350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 350 400 450 500 550 600 Vertical Section at 336.00° [50ft/in] 11/18/2002 2:23 PM ) ') .....11.... .....~ .--.----.-.------ INfEQ bp BP Baker Hughes INTEQ Planning Report .."..~._-..,~,.,._'-~...."_..._--,._.._._..~......,._-.,.~.,-_.._'~-..."...__._._.~.,,-....,.---'"-~_.-..---..'"...~_.._-,-_.---,~-........,---, ..-_,~._...__.. ,...__.._'._'_......'"":'".-.....,._.,._._...,...__..__..."_._""~_-:--.__._.,:._.._~'~_..__,......_...,~"._....._.__. ..__ "'_'M" ".__._,~....,,--_.,_. IJafe:·.·i... 4/18/2Q02..··...····!' .............. ··...'ti.ne:i,·14:24:15'.......'..·..·'.·.... '.. .....',:,<...... ~åge: Ç()+Ord¡~ate(~~)R:ef~r~~c~:..·'.'· .,YV~II:.f:~94;Trµe:NOl'tr,,··.< .... ,·.···y~tttc~~('f~º), ~ef~r~~c~:····i'.., ·..........s~$t~IYI;'M~~n·$~at~\l~1 ' Section,.(YS) Referente: Well.,(ŒOON,O.OOE;336.00Azi) "_'__"'_"_'__.'.'._ un. _.. __ ______hn__.__ __n_...~~!~~~u~~t~n M!~.~.~:_~.~i~mu~_~~~~_t-':l~~_n__~Y~:... ~~a~.I.~._.._ _h. Company: E3PAmóco Field: Prudhoe. Bay Site: PBFPad Well: F-04 . .,.~~~.~~~~~_.:.~!~.~!!:~f=9.1fL_._.~_. 1 -.-..--".".-,.......-.,--.----.".-."-,..,,. ..- -.~.....,"..._..,_~___~,_. __... _"_ .. _ .._ n____.________ _ ..___. ... _.__.___.__..______ __.____. --- -.~-----_." -- ---- - - -- .-- Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level .'''., ..-." """. "_. -" ..".-..-..~.. '--"- Map Zone: Alaska. Zone 4 Coordinate System: Well Centre Geomagnetic Model: BGGM2001 _. ._._,__.._'_.w,·._..___._,_____..~.._,__~.___.,._,_,____.._..,____.__.,_...,..'_~.____ __,-__,_,_,_"_,___,." ,,_~..,._._..,__ .. .--.........." .... ,.,_." ..---...-.-....-- ..,.-.,-..,. ,-,- ...- _. _.._,___.."_,.,_,,...~.._,_..___ .._ _·'_'.'__'~'._n'_'__'__"'_ _..,-,,-, .--.--'.,.....-........"--..,.,,-,....., ._~."- -., -.---.-.--- ..._,- ,.----..--.--...,-,..-..".-.-_____"......,.. "__.__._._.__"._.,_,_._...__,.__.._.,_."._.______,,__,,_.,.__...."..w.__._._,_"'_...__.,____.._..._..._, ..____._____.,.__.____..______._"___,_..._,,._._.._,....___"...'.._'...__.. Site: PB F Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft F-04 F-04 Well Position: Well: -, "....... ..-- -.-.-.-.,,-.---- 5972527.29 ft Latitude: 70 19 55.283 N 650960.70 ft Longitude: 148 46 31.468 W North Reference: True Grid Convergence: 1 .15 deg _ .. .... -.-.-..- --- ,,,,_,.._.,,... .._._.____._ .__.__... _., _..___...~._., . w..__.._"'.__._..,_..__._...__..._..w"_.______._._,_·. d...._'_..·_..".__.._,,_..__,,_._""..._..._ .........._.._,,__.._......_. _"__'__~"_'" ..___..._. "._...._. -- _ _ .... --"--"" .-.'" "."" ._.~._. .... - - . - ..-. -... 'w ....,_.... _....'"'___".w,~...__._~,,__.__ __ ~.~.._._._.._______ ____ __·_..____·_._._.._.__.._.__."_,,_..._...w..._....__.,,.._.,"'_"__"_.._.. ....._.._ ___..._.._.___.__...,.._..._____..._......w___.___.____._..._.__ .._._...._._..".."_.,,_,.,,__~.__._.._,.,,..,.._. Slot Name: 04 70 20 148 46 7.875 N 1.527 W +N/-S 1280.42 ft +E/-W 1025.27 ft Position Uncertainty: 0.00 ft ___'_ _ __ _. _ .·___·________...___·_."___..·_n.._·__..._._"._m.._.__..,__..... Northing: Easting : 5973827.99 ft 651959.92 ft Latitude: Longitude: --..--.-.--..-"" ----.-.,.-,-..,-- . .n....._.......· ._._....... '-' -- - -..--.-...... ..._---~.--_._--.,'" .-- ......--- ...-..-.-..--.....-.----.---... .._~" .... . ....-.......-".,-.- ..--- ... ~.......... ...._._.. __.__.._.._._.._,_n_ Wellpath: Plan#5 F-04A 500292008901 Current Datum: 4: 042/2/1971 00:00 Magnetic Data: 4/18/2002 Field Strength: 57502 nT Vertical Section: Depth From (TVD) ft 0.00 Targets Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 F-04 10100.00 ft Mean Sea Level 26.34 deg 80.82 deg Direction Height 57.10 ft +N/-S ft 0.00 336.00 .- - - - .- - -....- -.- ...~- .-.-.-- .-~ ...-.... --.--.- --.. -. ·___n.· ~ ...._ h_..n .. ._.' ._...._...._~__.._ ...__........_.._ ___._.__......_ . _."__".._,,. ___..._.....__ ._.~_ . ....____ ._,..._,,_ .._____.._......__.._.,...,.__...___.. ._.._. ...__..___.....__........__..__..___... ~__._._......._h......_. Annotation MD ft ì 10100.00 10150.00 I 10164.00 10197.60 10297.60 , 10573.99 10970.00 11094.00 . 11250.00 Map Map <---·Latitude ~--> ~..;..Longitude. ---> Name Description TVD+N/~S :+E/..W No~thingEasting .l)egMinS~ peg.l\1inSeç n..~P.~... ...... .......... ~.I)ir:,. ...c. ..c_.!~..__,._.._._,.:..._:_~:...........,_.,'".~.....~.c_..__ ...:....:.._ ..._ .c. :~:._.~..._.c.. ._.~_~_:.._~_: _.___..._:.--'......_.._...__._ ____...._....___...._._._.._....... .C..:.--'..... ...._... ....... .. F-04A Polygon5.1 0.00 1446.74 3760.24 5975350.51 655689.79 70 20 22.095 N 148 44 11.694 W -Polygon 1 0.00 1446.74 3760.24 5975350.51 655689.79 70 20 22.095 N 148 44 11.694 W -Polygon 2 0.00 1471.50 4020.81 5975380.54 655949.79 70 20 22.337 N 148 44 4.082 W -Polygon 3 0.00 733.68 4151.00 5974645.57 656094.89 70 20 15.080 N 148 44 0.292 W -Polygon 4 0.00 526.46 4506.93 5974445.62 656454.92 70 20 13.040 N 148 43 49.900 W -Polygon 5 0.00 198.35 4160.23 5974110.57 656114.96 70 20 9.815 N 148 44 0.031 W -Polygon 6 0.00 459.15 3875.40 5974365.53 655824.93 70 20 12.381 N 148 44 8.345 W -Polygon 7 0.00 1044.98 3842.18 5974950.52 655779.85 70 20 18.143 N 148 44 9.306 W F-04A T5.2 8970.00 8975.00 1446.72 3933.49 5975354.00 655863.00 667.00 4056.73 5974577.00 656002.00 70 20 22.094 N 148 44 6.633 W F-04A T5.1 70 20 14.425 N 148 44 3.046 W ._.. ·..._·_._w...__.. _""'_ .·_._.__n_·._._____w.._._. ------.-,,-.-.--...,,---.---.--..-..-.---.---.-.-.-.---- TVD ft 8631.51 8672.96 8684.92 8715.76 8812.43 8974.84 8973.20 8972.29 8971.21 ... --. -_.......---..-- ~. __.._._. _. ______w.__.__._...h .___..___.____...._._w_____._._.__...~,..__._..._. ._. ___ _..____... _______. ..._____ .__.__...,_____.__._ ,,______. ._..w_...._.. ...,___ ~ ___.__._~__...__._. ..,,_. .... TIP KOP 1 2 3 4 5 6 TO ,O~:'·:!;'·'bP ,..,.10,:"...",:",,1.,. ...,1 ':'--... I ,¡'I,!-,' "," ) ) BP Baker Hughes INTEQ Planning Report . 1~1"(lÍQ . .",._.~....."_"..,..µ.~,_,_",,._L"'" ..,---....,_.."'.~..'.~.-.·r.~...._._.-.._-,-...--~...~-.._.. _ _"..__ .;,......____,.._._.,.__.".___.. ,___.__,__._.",,~.~_-...-__.._..__.-:-_,__._..._......,..-__.~...~__,...'-.....---.-.....-...,-..-.----.'-.--,......,--'..,..~.-r_.--.-~..---_.'"---....._,,-...-_._.._..".,-,,_.._¥..__.-~._--'----,'"-_._.. -"......- ,"'.','..--------. COItl påny: BP AmocoD~tê:)~118/ZQ02 ...i .. ···.·Jim~: ,t4:24:15i.... :.·.·......ip'age: 2 Field: Prudho&.Bayç~;'Or~¡llate(N~l.~er~rellce:· 'W~U:F~04,TruElIN()rth Site: .. PBF Pad V~I1;~~al(T"J?)R~fe..e~ce: Sy~!em:I\I1ß¡anSElaL~vel Well: F~04 Sec:ti?n'(V~)~~(er~nce: ...:....... Well (0.OON,O.00E.336.00Äzi) -~~~:~~~~;::,:.~~~~~,~c:.~~~t-;":::.,,c:.:c:::c..,,::::::~::::·:::c-·_-·:.:.":.:-::::~:::::::~:'::==::·=:="·.:::::::::=:=-~~~~:~~=~:~~~~:~~~~~~~~.~c~~~=:::::~~~~~~~~r~~~~~r;=".::::,::".::c:::~~L.2~~?1~,...:c::::..., Plan: Plan #5 New targets from Roger Sels Principal: Yes .~.'~_' ..n ".~ .__ _.."..._.....___ __ ....__ .,____ ,_.._._, ,,__....__... ..,..._.._,_~'.... ._ .. ._._..____.____"'_'.._...__...._.____._.,_......_..... .,~"_..___.._,.._~.._..._.._,,._..__.,. Plan Section Information Date Composed: Version: Tied-to: 4/18/2002 1 From: Definitive Path __."..._______.__._~",_.______..w_____.___,_.__._...._....'".___..._.....__,_____.._.._,_._ . ___.. '__'__"___'__'" .,_ _. .""_..."_ ''''0 . ..~.__ ",'.. '" _.~_,."...".."._ "_.."_.,,,, ,.......__ .,',. ~__'.'.._.",..._,_._"_"."..,., ~.._._~..,',.,__"._,.,.._",." C"_' '..._'_' ...."__,,~_..,,....~,~."_.~. .~.__~,.~.__".._,.._,"...,,,.""~~._._~..__..__...,,.. ..._,__·,_·."_._ø___,._"__.___.~._..._~·~,, __'~'_"'.""'__'_'. ,~.._....~".~__,.__~."'.._.__,.."._~.__......,~~__."._'...._.."~.. __~__..."'~......"_.~.~.. ....~ ..---....-.-....-,..,. ,-"._,-"'" .~- MD ft .H.'····..,,",,·..·~,,'_··_,,··~.. 10100.00 10150.00 10164.00 10197.60 10297.60 10573.99 10970.00 11094.00 11250.00 Incl Àzim, TVD deg deg ft' ~.,.." ..,'_ ..., .:....,.;.. ..,,~...:. ..~........ __.. ""_"'H~'_''';':'';'_ .._,__. .: __,:..._,.."..I...:...~,..:~. _ .~:... ~~c.",:-..: ,._. 34.00 104.00 8631.51 34.00 103.50 8672.96 28.50 105.54 8684.92 18.00 111.55 8715.76 21.25 221.56 8812.43 90.00 307.27 8974.84 90.43 6.67 8973.20 90.41 348.07 8972.29 90.37 11.47 8971.21 +N/-~+E/..WDLS:øuild\ T#rn T~ØTa.rgef ..._,...._._.~:~...._._...~.__',.,"_.!~~:.".._..~~e.:~~ 'oQf(~égJ1:OQftde~!1BB~__.._~ê~~_....c . . ... .c~:L~l..__L...~_.:."-~__. .:_. 612.33 4163.37 0.00 0.00 0.00 0.00 605.68 4190.53 0.56 0.00 -1.00 269.79 603.87 4197.56 40.00 -39.29 14.54 170.00 599.81 4210.15 32.00 -31.25 17.91 170.00 580.05 4212.56 32.00 3.25 110.01 140.00 638.30 4031.98 32.00 24.87 31.01 86.00 986.63 3883.88 15.00 0.11 15.00 89.50 1109.95 3878.21 15.00 -0.02 -15.00 -90.00 1264.87 3877.58 15.00 -0.02 15.00 90.01 Survey MD ... -. ···i;~I·n .. ····..~i;_·h. ···--SSTVO---·---··N/S·····,.----·- -·-·Eïw····..·· ·····--:ï\1~;N-··_·· "T-~~~~~n..-. ······-·;·VS··-·······-·"£iLS·····,.··TFO. T6~i""'l ~.. . ..._........... ~~.~... deg.... ..:: .....:....~......, .....:....c.:._....~_~..:c. I....;.::". ....!!c..:.:.,-,...,..:",-: _;._c~:c~.:.:.,...~c':_' ...,..~.~._:.-,--,.,,; . ...",.....:_,~..~~.__,....~.~~~~~~..e~?~._....:~~§,.._.. ......_.....'c~..":... 10100.00 34.00 104.00 8631.51 612.33 4163.37 5974524.50 656109.72 -1134.01 0.00 0.00 TIP 10125.00 34.00 103.75 8652.23 608.98 4176.94 5974521.43 656123.36 -1142.59 0.56 269.79 MWD ~g~~~:~~ ~¿:~~ ~~~:~~ ~~~¡:~~ ~~~:~~ :~~~:~~ ~~~:~~::i1 ~~~~¡~:~i ~~ ~~~:~¡ 4~:~~ /~~~:~~ ~OP 10175.00 25.04 106.98 8694.74 602.49 4202.31 5974515.46 656148.85 -1158.83 32.00 170.00 MWD 10197.60 10200.00 10225.00 10250.00 10275.00 10297.60 10300.00 10325.00 10350.00 10375.00 10400.00 10425.00 10450.00 10475.00 10500.00 10525.00 10550.00 10573.99 10575.00 10600.00 10625.00 10650.00 10675.00 10700.00 10725.00 10750.00 10775.00 10800.00 10825.00 10850.00 10875.00 10900.00 10925.00 18.00 17 .42 12.57 11.79 15.69 21.25 21.32 23.47 27.74 33.32 39.65 46.42 53.47 60.69 68.01 75.41 82.84 90.00 90.00 90.03 90.07 90.10 90.13 90.16 90.19 90.22 90.25 90.28 90.31 90.33 90.35 90.38 90.40 111.55 113.20 138.31 176.75 206.78 221.56 223.67 244.00 259.75 271.10 279.36 285.61 290.57 294.69 298.26 301.47 304.48 307.27 307.42 311.17 314.92 318.67 322.42 326.17 329.92 333.67 337.42 341.17 344.92 348.67 352.42 356.17 359.92 8715.76 8718.04 8742.21 8766.68 8791.00 8812.43 8814.67 8837.82 8860.38 8881.93 8902.03 8920.30 8936.39 8949.97 8960.79 8968.63 8973.34 8974.84 8974.84 8974.83 8974.81 8974.77 8974.72 8974.66 8974.58 8974.49 8974.39 8974.27 8974.15 8974.01 8973.86 8973.70 8973.53 599.81 599.53 596.02 591.43 585.85 580.05 579.41 573.93 570.71 569.80 571.23 574.97 580.95 589.04 599.10 610.92 624.28 638.30 638.91 654.74 671.80 690.02 709.32 729.62 750.82 772.85 795.60 818.98 842.89 867.23 891.88 916.75 941.73 4210.15 4210.82 4216.08 4218.04 4216.66 4212.56 4211.97 4204.34 4194.12 4181.51 4166.76 4150.14 4131.98 4112.65 4092.50 4071.94 4051.36 4031.98 4031.18 4011.83 3993.56 3976.45 3960.57 3945.98 3932.75 3920.93 3910.58 3901.75 3894.45 3888.74 3884.64 3882.15 3881.30 5974512.93 5974512.67 5974509.26 5974504.72 5974499.11 5974493.23 5974492.58 5974486.95 5974483.52 5974482.36 5974483.49 5974486.89 5974492.50 5974500.20 5974509.84 5974521.24 5974534.18 5974547.81 5974548.40 5974563.83 5974580.52 5974598.39 5974617.36 5974637.35 5974658.29 5974680.07 5974702.61 5974725.80 5974749.55 5974773.77 5974798.33 5974823.14 5974848.10 656156.74 656157.42 656162.75 656164.80 656163.53 656159.55 656158.97 656151.46 656141.31 656128.72 656113.94 656097.25 656078.98 656059.48 656039.14 656018.34 655997.50 655977.84 655977.02 655957.36 655938.76 655921.28 655905.01 655890.01 655876.36 655864.10 655853.29 655843.98 655836.21 655830.01 655825.40 655822.41 655821.05 -1164.47 ~1165.00 -1170.35 -1175.33 -1179.87 -1183.50 -1183.84 -1185.75 -1184.54 -1180.23 -1172.92 -1162.75 -1149.91 ~1134.65 -1117.27 -1098.10 -1077.53 -1056.83 -1055.95 -1033.62 -1010.61 -987.00 -962.91 -938.44 -913.68 -888.75 -863.76 -838.80 -814.00 -789.44 -765.25 -741.52 -718.35 "',"',-_. -.---.,--..-.---- ..~--_. ._, -----.--- 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 32.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 168.71 2 140.00 MWD 138.43 MWD 114.13 MWD 76.49 MWD 47.27 3 86.00 MWD 84.04 MWD 65.20 MWD 50.98 MWD 41.18 MWD 34.52 MWD 29.94 MWD 26.75 MWD 24.50 MWD 22.95 MWD 21.94 MWD 21.37 4 89.50 MWD 89.50 MWD 89.50 MWD 89.50 MWD 89.51 MWD 89.52 MWD 89.53 MWD 89.54 MWD 89.55 MWD 89.57 MWD 89.58 MWD 89.60 MWD 89.62 MWD 89.65 MWD 89.67 MWD bp ) ) BP Baker Hughes INTEQ Planning Report C í~I"'(ß.Q Field: ··Prudhoe Bay C~-p..di~~te(N~)ª~r(!rel1ce: 'JV~U:t~p4,TrUE;lNørjh Site: PBF . Pad :V~rt~c.I(1fYml{ef~r~l1ce: Sys~~rn:Me.~n$~~'L~vel'. Well: F-04 :$eÇtion(VS)Reft:reoçe:, . .....\IY~II (O.OON O;00E.~36~OO~D _. .~~~~.r>..~~.~:_ .~I~~~?_~~~~~_.,________.__:..__.._~____._._~___-,~____~_______:_.:___~_~"___::.c____~~!1':~~_£~I~~~1!~~I!~.!~cI:. ___.:..~~~~~~~~"-ç:,::!~t~l~____c.,,_""~~~::..,_,9~~~I.~ Survey -"'-~ "- ~~ .~,,~ .-:-".....-.,-"~~.,,_.,,--:-'_..~~-":-- "·~'·-ë-:--'-·'·_~~-"-,-'-·-··_,·-..·_~-,· "-:":"''':''':~' .---:---."._",-.:,,~,":- ·~'''·,~-7'''''-·-~~'~~'~~-'ë~···'·_·--~~·:-:"·~:·',':'''--:-~~·:-,--~''':"':-·:--~~-:-:-'·~-:-:"-·~-·~-~-:-,""'":"7"-:--"'-;'"",,:,,",,:~~~'-;-_.'~--:-":'T""'-·,~--~._-..,..'--~.-:--_.~_.:----...."..-:-~-~,.._._~-~_._--~.,.._-- MD loci Azim SSTVD ~/S EIW MapN ~~p~ VS·' .ÐLS TFO Tool ft deg deg ft . ft... ft... .. . ft...... . .. ft'.. ff; d ;!g(1()Oft deg . '... ,~,-,~"... ......;·~....._...~."__...,,...~.__.__~____~~"".._~~___u__~_._.:..._.___ '".._~._...,_,_..:....:-__.....__.:.._.,_..:. _.,__.__._, .":",.,.~...;.,,,...~o:.____~._~.:....__'_._...........;,........._.:.....,............_._~.,~,'~'''''''__'_''''''''''._ ";';""-_""_~.'';''..._....__........._...:.........",-:...._..:..._~._"......,~.~....__~,_'':''_..~,.~........;.~...;..:..... ..:...:..............,......;.._._._....."......~, __...,.._._.~_ 10950.00 90.42 3.67 8973.35 966.72 3882.08 5974873.09 655821.33 -695.84 15.00 89.70 MWD 10970.00 90.43 6.67 8973.20 986.63 3883.88 5974893.04 655822.72 -678.38 15.00 89.72 5 10975.00 11000.00 11025.00 11050.00 11075.00 11094.00 11100.00 11125.00 11150.00 11175.00 11200.00 11225.00 11250.00 90.43 90.43 90.43 90.42 90.41 90.41 90.41 90.41 90.40 90.40 90.39 90.38 90.37 5.92 2.17 358.42 354.67 350.92 348.07 348.97 352.72 356.47 0.22 3.97 7.72 11.47 8973.17 8972.98 8972.79 8972.61 8972.42 8972.29 8972.25 8972.07 8971.89 8971.72 8971.55 8971.38 8971.21 991.60 1016.53 1041.53 1066.48 1091.28 1109.95 1115.83 1140.51 1165.39 1190.38 1215.36 1240.22 1264.87 3884.43 3886.19 3886.32 3884.81 3881.67 3878.21 3877.01 3873.04 3870.68 3869.96 3870.87 3873.42 3877 .58 5974898.02 5974922.98 5974947.97 5974972.88 5974997.61 5975016.21 5975022.07 5975046.65 5975071.48 5975096.45 5975121.44 5975146.35 5975171.07 655823.17 655824.43 655824.05 655822.04 655818.40 655814.56 655813.24 655808.77 655805.91 655804.68 655805.08 655807.13 655810.79 -674.07 -652.01 -629.22 -605.82 -581.89 -563.42 -557.56 -533.40 -509.71 -486.59 -464.14 -442.46 -421.64 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 270.00 MWD 269.99 MWD 269.97 MWD 269.94 MWD 269.91 MWD 269.88 6 90.01 MWD 90.02 MWD 90.04 MWD 90.07 MWD 90.10 MWD 90.12 MWD 90.15 TD / TOTs Mud Cross TOTs /' BAG 4/29/2002 Flow Tee 2" combi ram/slips ................... ....... .......... middle of pipe/slips ......................., 2 3/8" ram middle of blind/shears -- --..J Mud Cross middle of flow cross -- ~ //./~.-..- 2" combi ram/slips middle of pipes ,...'....,'.......,.. Blind/Shears middle of slips bUm of bag top of bag s- O) en -- c::: All Measurements are from top of Riser ) ) H 206698 DATE 04/11/02 CHECK NO. 00206698 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS iOO.OO VENDOR ALASK.AO I LA DISCOUNT NET iOO.OO 00 040902 CK040902 PYMT COMMENTS: HANDL:NG INST: PERMIT TO DRILL FEE SiH - TERRIE HUBBLE X4628 H , .,.. ~O'-/A ',;- ." "- THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ iOO. 00 100.00 BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 FIRST NATIONAL BANK OF ASHLAND AN AfFlUATE OF NATIONAL CllY BANK CLEVELAND. OHIO No. H 206698 CONSOLIDATED COMMERCIAL ACCOUNT 56-389 --¡:j"2 00206698 PAY ONE HUNDRED & 00/100************************************* US DOLLAR DATE 04/i1/02 AMOUNT $100. 00 To The ORDER OF ALASKA OIL AND GAS CONSERVATION COMMISSION 333 WEST 7TH AVENUE SUITE 100 ANCHORAGE AK 99501 NOT VALID AFTER 120 DAYS -" Q "~.."r",. .n'" {!- !I ,.; /. ¡ \ <:--9 (!;¡ V\d~4-_, -- III 2 0 b b 9 B III I: 0 ~ . 2 0 ~ B 9 5 ': 0 0 8 L. L. . 9 III ... ) ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETIERlPARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LEITER WELL NAME -it u F-·() Y A CHECK 1 ST ANDARD LEITER DEVELOPMENT CHECK WHAT APPLIFS ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) DEVELOPMENT RED RILL Pß..,OT HOLE (PH) v EXPLORA TI0N ANNUL~ DjS'f"OSAL ~NO INJECTION WELL ANNULAR DISPOSAL <..--> YES INJECTION WELL RED RILL ANNULAR DISPOSAL THIS WELL "CLUE" The permit is for a new weUbore segment of existing well ----J Permit No, ,API No. . Production should continue to be reported as a function of the original API number stated above. . In accordance with 2.0 AAC 25.005(t), all records, data and logs acquired for the pilot hole . must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for wel~ (na.me on permit). Annular disposal has not been requested. . . Annular Disposal, of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved. . . DISPOSAL INTO OTHER Please note that an disposal of fluids generated... . ANNULUS L-J YES + SP ACING EXCEPTION Templates are located m drive\jody\templates Enclosed is the approved application for permit to drill the above referenced well. The permit is approved ,sùbJect to full compliance with 20 AAC 25.055. Approval to periorate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) will assume the liability of any protest to the spacing exception that may occur. WELL PERMIT CHECKLIST· COMPANY I3fX WELL NAMEfßú ¡::ðt¡fA PROGRAM:Exp _ Dev L Redrll ~ Re-Enter _ Serv _ Well bore seg_ " FIELD & POOL " r; c..¡ ol- ~ ò INIT CLASS () .p~ / ... e>f / GEOL AREA t:ë? t'j UNIT# / / C. <' ð ON/OFF SHORE ~ ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . fY\ N 2. Lease number appropriate. . . ~ . . . . . . . . . . . . . . . Y N 3. Unique well name and number. . . . . . . . . . . . . . . . . Y N 4. W ell located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. W ell located proper distance from drilling unit boundary. ... . Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. ". . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N 12. Permit can be issued without administrative approval.. . . . . I. ~ N (Service Well Only) 13. Welll?cate~ v:(in ~rea & strata ~uth?rize? by injection order #_ "5:Y /z/L A \ (Service Well Only) 14. All wells wlln ~ mile area of review Identified. . . . . . . . .". h N ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . (Ei 16. Surface casing protects all known USDWs. . . . . . . . . . . Y N / 17. CMT vol adequate to circulate on conductor & surf csg. . . . . . Id It-- 18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . -'f--N- 19. CMT will cover all known productive horizons. . . . . . . .. . ~ N 20. Casing designs adequate for C, T, B& permafrost. . . . . . . .. NT· 21. Adequate tankage or reserve pit. . . . . . . . . . . . . . . . . N C-. \) L..l. 22. If a re-drill, has a 1 0-403 fo~ abando nment been approved. . . "& N 5' (p I 0 L 23. Adequate wellbore separation proposed.. ...". . . . . .. . . (YJ N 24. If diverter required, does "it meet regulations. .. . . . . . ". . . Y N tJ lit-. , 25. Drilling fluid program schematic & equip list adequate. . . . . éí) N i11 ~11 Itl J¡J -8. 7 tl Pi . 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . GJ N APPR DATE 27. BOPE press rating appropriate; testto 35"00 psig. éj) N I. ;c'A- 28'. Choke manifold complies w/API RP-53 (May 84). . . . . . . . œ. N ~ ,12. 8'03' 29. Work. will occur without operation shutdown. . . . . . . . . . . ?i2 N . 30. Is presenceofH2S gas probable.. . . . . . . . . . . . . . . . Y (Q/ (Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . . . --v-N N/ A- GEOLOGY 32. Permit can be issued wlo hydrogen sulfide measures. . . . . (ý) N APPR ~D,*, TE 33. Da.~a ~resent.ed. on po.tential overpressure. zones. . . . . . . . ){. . . . ./1 .-',#,; h (. / 34. Seismic analysIs of shallow gas zones. . . . . . . . . . . . . y. /I..), M \ /YJ'. ~?ð< 35. Se~bed condition survey (if off-shore). . . . . .. ...... N (Exploratory Only) 36. Contact namelphone for weekly progress reports. . . . . . .. Y N APPR DATE ~~ Rev: 10/15/02 ~~',vrl___ ,.p,u,'s.~ .£. r-A~,..~i.~/ / Io,u ~J /,r'Y"-<''''~ 57"J J+_, . I' ~ GEOLOGY: RPJ'Æ' RESERVOIR ENGINEERING JDH UIC ENGINEER JBR PETROLEUM ENGINEERING: TEM COMMISSIONER: Commentsllnstructions: ~: Co! j;ç?(03 MLB Clf 12~/o3 SFD / MJW WGA G:\geology\perm its\checklist.doc WELL PERMIT CHECKLIST COMPANY LJj>)I WELL NAME~ß'óf ¡::~- (')t(A FIELD & POOL r:; r:.;Ò /.5 /*') INIT CLASS /lQ?.{/ / '" 0:) ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . 3. Unique well name and number. .. . . . . . . . . . . . . . . . 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . 5. Well located proper distance from drilling unit boundary. . . 6. Well located proper distance from other wells.. . . . 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . 9. Operator only affected party.. . . . . . . . . . . . . . . . . . 10. Operator has appropriate bond in force. . . . . . . . . . . . . 11. Permit can be issued without conservation order. . . . . . . . APPR DATE 12. Permit can be issued without administrative approval.. . . . . tfk- ~/o 2- 13. Can permit be approved before 15-day wait.. . . . . . . . . . ENGINEERING 14. Conductor string provided . . . . . . . . . . . . . . . . . . . 15. Surface casing protects all known USDWs. . . . . . . 16. CMT vol adequate to circulate on conductor & surf csg. . 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . 18. CMT will cover all known productive horizons. . . . . . . . . 19. Casing designs adequate for C, T, B & permafrost. . . . . . 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 21. If a re-drill, has a 10-403 for abandonment been approved. . . 22. Adequate wellbore separation proposed.. . . . . . . . . . . . 23. If diverter required, does it meet regulations . . . . . . . . . . 24. Drilling fluid program schematic & equip list adequate. . . . . 25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . APPR DATE 26. BOPE press rating appropriate; test to 3~oo psig. \J-JG,A s / (pI az. 27. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . . 28. Work will occur without operation shutdown. . . . . . . . . . . 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . 30. Permit can be issued wlo hydrogen sulfide measures. . . . . Y (£Þ . 31. Da~a ~resente~ on potential overpres. sure zones . . . . . . . Y N /" ) /7 32. Seismic anal~~ls of shallo~ gas zones. . . . . . . . . . . . . Y ,,.,N'" ß ~ /"f I APPR DAT§ 33. Seabed condition survey (If off-shore). . . . . . . . . . . . . I ^nJ6(':Ý N l(/r'- ".7(/'(')2 34. Contact name/phone for weekly progress reports [exploratory 711 Y N ANNULAR DISPOSAL 35. With proper cementing records, this plan -4 (A) will contain waste in a suitable receiving zone; . . . . . . . Y N ,,// (B) will not contaminate freshwater; or cause drilling waste. .. Y ~~/ /LJlH , to surface; ~ (C) will not impair mechanical integrity of th. e well used for disposal; N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION: RP#,' SFD_ GEOLOGY APPR DATE /?4-: ,-(4;;. "2- ~ WGA \t-iIJ k r~1L PROGRAM: Exp _ Dev~ Redrll)( Serv _ Wellbore seg _ Ann. disposal para req _ GEOLAREA q <; ò UNIT# if ç;. 5 (? ON/OFF SHORE ~~ RN Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N \~ N . ¥.--N-- ~_~ ¡J/Ar -¥-N- ~y ~ N C- T D t1.... ... N I\-¡?p~v e-ci s I (PIa 2- . 6f/N ~N/A- lC>N ~ ~ Nt.£. ¡) "- '-<..1 (p v-> f-<' , l ~ ( Comments/Instructions: COT DTS 03/07/0è JMH ') ) Well History File APPENDIX Infornlation of detailed nature that is not particularly gemlane to the Well Pennitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding infomlation, information of this nature is accumulated at the end of the file under APPEN.DIX. No special effort has been made to chronologically organize this category of information. c9œ~ lod ) ) **** REEL HEADER **** MWD 03/11/26 )J.-)<S{ BHI 01 LIS Customer Format Tape RECEIVED **** TAPE HEADER **** MWD 03/11/26 DEC 11 2003 435828 01 Atæka Oii& G,fiS, Q>.n~.ICOmmÎ_n Anellørase 2.375" CTK *** LIS COMMENT RECORD *** ! !!!!!! !! !!! !!! !! !! Remark File Version 1.000 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! Extract File: Idwg.las NVersion Information VERSo WRAP. NWell Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 9901.5000: STOP.FT 11226.5000: STEP.FT 0.5000: NULL. -999.2500: COMPo COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API . API NUMBER: NParameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 02 TOWN.N 11N RANG. 13E PDAT. MSL EPD .F 0 LMF . RKB FAPD.F 57.1 DMF KB EKB .F 57.1 EDF .F N/A EGL .F 0.0 CASE.F 10010 OSl . DIRECTIONAL OS2 . PRESSTEQ I NRemarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All Gamma Ray data presented is Realtime data. (4) The final wellbore (F-04A) was an open hole sidetrack off the original wellbore (F-04APB1) at 10786' MD (8971' SSTVD) (5) Baker Hughes Inteq utilized CoilTrak downhole tools and ADVANTAGE surface system. (6) Tools ran in the string included CCL, Electrical Disconnect and 1.20: NO: CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ------------------------------- Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska), Inc. F-04APB1 Prudhoe Bay Unit 70 deg 20' 7.875" N 148 deg 46' 1.527" W North Slope Alaska Baker Hughes INTEQ 2.375" CTK 26-Feb-03 500292008970 Description ------------------------------- Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 Other Services Line 2 <:~ ~~~~",f'v\ ~ Circulating sub, )Drilling Performance Sub (inner, )outer downhole pressure, downhole weight on bit, downhole temperature), a Gamma and Directional Sub, and an Orienting Sub with a near bit inclination sensor. (7) The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) recorded by SWS on March 02, 2003. (8) The interval from 11200' MD (8991' SSTVD) to 11226' MD (8991' SSTVD) was not logged due to sensor bit offset at TD. MNEMONICS: GRAX -> Gamma Ray MWD-AAPI [MWD] (MWD-AAPI units) ROPS -> Rate of Penetration, feet/hour TVD -> Subsea True Vertical Depth (SSTVD), feet SENSOR OFFSETS: RUN GAMMA 1 29.33 ft. 2 29.01 ft. 3 29.77 ft. 4 29.87 ft. 5 26.67 ft. 6 26.67 ft. 7 28.11 ft. 8 28.11 ft. 9 28.11 ft. 10 28.11 ft. CURVE SHIFT DATA OBSERVED, ACTUAL, 9908.17, 9907.13, 9916.28,9915.65, 9920.43, 9920.43, 9937.27, 9936.02, 9965.53, 9965.32, 9971.04, 9970.42, 9976.65, 9977.07, 10009.7, 10010.1, 10014.7, 10015.1, 10022.6, 10022.8, 10029, 10029.9, 10041.9, 10040.4, 10045.6, 10046.3, 10054.8, 10054.2, 10060.7, 10059.3, 10067.4, 10066.5, 10071.9, 10072.6, 10080.5, 10082.1, 10083.6, 10086.9, 10171.8, 10170.1, 10205.3, 10203.2, 10211.9, 10209, 10217.1, 10215.2, 10251.3, 10248.6, 10284, 10282.7, 10300.6, 10296.8, 10317.5, 10316.1, 10337.3, 10336.6, 10356, 10354.1, 10362, 10359.3, 10365.1, 10363, 10369.8, 10369.4, 10383.5, 10381.3, 10392.3, 10389, 10394.8, 10392.7, 10403.1, 10400.6, 10410.1, 10406.6, 10430.1, 10427, 10448.6, 10443.2, 10494.7, 10488.7, 10500.9, 10496.8, 10621.6, 10618.5, 10644.7, 10640.9, 10661.3, 10656.9, 10688, 10682.8, 10693, 10688.4, 10758.7, 10753.9, 10780.5, 10778.8, EOZ END DIRECTIONAL 30.18 ft. 29.86 ft. 30.62 ft. 30.72 ft. 27.52 ft. 27.52 ft. 27.03 ft. 27.03 ft. 27.03 ft. 27.03 ft. DISPLACEMENT -1.03906 -0.623047 o -1.24707 -0.208008 -0.623047 0.415039 0.416016 0.416016 0.207031 0.832031 -1. 45508 0.624023 -0.624023 -1. 4541 -0.831055 0.624023 1.66309 3.3252 -1. 66309 -2.07812 -2.90918 -1. 87012 -2.70117 -1.24707 -3.74121 -1. 45508 -0.623047 -1. 87012 -2.70117 -2.07812 -0.415039 -2.28613 -3.3252 -2.07812 -2.49316 -3.5332 -3.11719 -5.40332 -6.02637 -4.15625 -3.11719 -3.74023 -4.36328 -5.19531 -4.57129 -4.7793 -1. 68066 ') ) Tape Subfile: 1 125 records... Minimum record length: Maximum record length: 10 bytes 132 bytes **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN LCC CN WN FN COUN STAT mwd.xtf 150 BP Exploration (Alaska) Inc. F-04APB1 Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** ! !!!!! !!! !!! !!!! !!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) recorded by SWS, 02-Mar-03 *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR ROP GR ROP GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 2 GR ROP MWD MWD 68 68 1 1 AAPI F/HR 4 4 4 4 ------- 8 Total Data Records: 32 Tape File Start Depth 9904.000000 Tape File End De~ ) Tape File Level Spacing Tape File Depth Units 11226.000000 0.500000 ) feet **** FILE TRAILER **** Tape Subfile: 2 41 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN LCC CN WN FN COUN STAT raw.xtf 150 BP Exploration (Alaska) F-04APBl Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** ! !!!!!!!!!! !! !! !! !! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GRAX ROPS GRAX ROPS GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GRAX MWD 68 1 AAPI 4 4 2 ROPS MWD 68 1 F/HR 4 4 ------- 8 Total Data Reco. '} 32 ) Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 9905.000000 11226.000000 0.500000 feet **** FILE TRAILER **** Tape Subfile: 3 41 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** TAPE TRAILER **** MWD 03/11/26 435828 01 **** REEL TRAILER **** MWD 03/11/26 BHI 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subfile 1 is type: LIS Tape Subfile 2 is type: LIS DEPTH GR ROP 9904.0000 85.2290 0.0000 9904.5000 98.8131 6.2245 9950.0000 26.3130 38.5745 10000.0000 24.6686 25.2309 10050.0000 33.7705 11. 0728 10100.0000 19.9490 10.2074 10150.0000 22.3322 21. 0957 10200.0000 24.5578 35.2911 10250.0000 38.0689 22.6330 10300.0000 14.4542 24.2355 10350.0000 34.1748 19.6657 10400.0000 39.8066 33.1842 10450.0000 55.0560 13.5821 10500.0000 34.0483 35.6964 10550.0000 37.1414 62.3651 10600.0000 40.1828 126.9677 10650.0000 64.9965 188.8174 10700.0000 49.4623 162.9534 10750.0000 34.0098 130.2158 10800.0000 43.1096 116.6965 10850.0000 67.7013 107.5280 10900.0000 133.9734 46.9970 10950.0000 131. 0811 42.2371 11000.0000 113.5017 9.0254 11050.0000 83.0927 85.5874 11100.0000 46.5114 111.8864 11150.0000 ).0910 96.4796 ) 11200.0000 -999.2500 104.2845 11226.0000 -999.2500 -999.2500 Tape File Start Depth 9904.000000 Tape File End Depth 11226.000000 Tape File Level Spacing 0.500000 Tape File Depth Units feet Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 9905.0000 85.2290 0.0000 9905.5000 98.6285 6.1200 9950.0000 26.4770 39.2000 10000.0000 21.3233 25.4500 10050.0000 30.9435 8.4800 10100.0000 24.7591 4.5400 10150.0000 20.9798 24.5400 10200.0000 24.4156 26.5600 10250.0000 19.2619 6.6600 10300.0000 21.1826 26.6100 10350.0000 21.1826 27.0000 10400.0000 28.2142 61. 2900 10450.0000 -999.2500 -999.2500 10500.0000 29.6205 21. 7600 10550.0000 35.2458 53.5600 10600.0000 32.4331 111.1900 10650.0000 68.9973 170.8000 10700.0000 -999.2500 162.6000 10750.0000 -999.2500 115.1700 10800.0000 50.2300 141. 9500 10850.0000 71.1100 87.9700 10900.0000 138.4700 44.8700 10950.0000 139.9500 16.3000 11000.0000 114.6500 5.8300 11050.0000 73.9500 75.1800 11100.0000 45.9600 119.5700 11150.0000 100.9100 119.5800 11200.0000 -999.2500 117.7400 11226.0000 -999.2500 88.6400 Tape File Start Depth 9905.000000 Tape File End Depth 11226.000000 Tape File Level Spacing 0.500000 Tape File Depth Units feet Tape Subfile 4 is type: LIS ) ) ðOd~\OÔ i . **** REEL HEADER **** MWD 03/09/23 J) I If ( BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 03/09/23 435828 01 2.375" CTK *** LIS COMMENT RECORD *** ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ~Version Information VERSo WRAP. ~Well Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 9904.0000: STOP.FT 11206.0000: STEP.FT 0.5000: NULL. -999.2500: COMPo COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API . API NUMBER: ~Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 02 TOWN.N 11N RANG. 13E PDAT. MSL EPD .F 0 LMF . RKB FAPD.F 57.1 DMF KB EKB .F 57.1 EDF .F N/A EGL .F 0.0 CASE.F 10010 OSl . DIRECTIONAL OS2 . PRESSTEQ I ~Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All Gamma Ray data presented is Realtime data. (4) The final wellbore (F-04A) was an open hole sidetrack off the original wellbore (F-04APBl) at 10786' MD (8971' SSTVD) (5) Baker Hughes Inteq utilized CoilTrak downhole tools and ADVANTAGE surface system. (6) Tools ran in the string included CCL, Electrical Disconnect and Remark File Version 1.000 Extract File: ldwg.las 1. 20: NO: CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ------------------------------- Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska), Inc. F-04A Prudhoe Bay Unit 70 deg 20' 7.875" N 148 deg 46' 1.527" W North Slope Alaska Baker Hughes INTEQ 2.375" CTK 27-Feb-03 500292008901 Description ------------------------------- Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level casing Depth Other Services Line 1 Other Services Line 2 ~~Dm~ 'I sensor. Circulati. )SUb, a Drilling Performance Sub ~~kr and outer downhole pressure, downhole weight on bit, downhole temperature), a Gamma and Directional Sub, and an Orienting Sub with a near bit inclination (7) The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) recorded by SWS on March 02, 2003. (8) The interval from 11179' MD (8861' SSTVD) to 11206' MD (8862' SSTVD) was not logged due to sensor bit offset at TD MNEMONICS: GRAX -> Gamma Ray MWD-API [MWD] (MWÐ-API units) ROPS -> Rate of Penetration, feet/hour TVD -> Subsea True Vertical Depth (SSTVD), feet SENSOR OFFSETS: RUN GAMMA 1 29.33 ft. 2 29.01 ft. 3 29.77 ft. 4 29.87 ft. 5 26.67 ft. 6 26.67 ft. 7 28.11 ft. 8 28.11 ft. 9 28.11 ft. 10 28.11 ft. 11 26.04 ft. 12 27.90 ft. 13 28.11 ft. CURVE SHIFT DATA OBSERVED, ACTUAL, 9908.17, 9907.13, 9916.28, 9915.65, 9920.43, 9920.43, 9937.27, 9936.02, 9965.53, 9965.32, 9971.04, 9970.42, 9976.65, 9977.07, 10009.7, 10010.1, 10014.7, 10015.1, 10022.6, 10022.8, 10029, 10029.9, 10041.9, 10040.4, 10045.6, 10046.3, 10054.8, 10054.2, 10060.7, 10059.3, 10067.4, 10066.5, 10071. 9, 10072.6, 10080.5, 10082.1, 10083.6, 10086.9, 10171.8, 10170.1, 10205.3, 10203.2, 10211.9, 10209, 10217.1, 10215.2, 10251.3, 10248.6, 10284, 10282.7, 10300.6, 10296.8, 10317.5, 10316.1, 10337.3, 10336.6, 10356, 10354.1, 10362, 10359.3, 10365.1, 10363, 10369.8, 10369.4, 10383.5, 10381.3, 10392.3, 10389, 10394.8, 10392.7, 10403.1, 10400.6, 10410.1, 10406.6, 10430.1, 10427, 10448.6, 10443.2, 10494.7, 10488.7, 10500.9, 10496.8, 10621.6, 10618.5, 10644.7, 10640.9, 10661.3, 10656.9, 10688, 10682.8, 10693, 10688.4, DIRECTIONAL 30.18 ft. 29.86 ft. 30.62 ft. 30.72 ft. 27.52 ft. 27.52 ft. 27.03 ft. 27.03 ft. 27.03 ft. 27.03 ft. 24.96 ft. 26.82 ft. 27.03 ft. DISPLACEMENT -1. 03906 -0.623047 o -1.24707 -0.208008 -0.623047 0.415039 0.416016 0.416016 0.207031 0.832031 -1. 45508 0.624023 -0.624023 -1. 4541 -0.831055 0.624023 1. 66309 3.3252 -1. 66309 -2.07812 -2.90918 -1. 87012 -2.70117 -1.24707 -3.74121 -1.45508 -0.623047 -1.87012 -2.70117 -2.07812 -0.415039 -2.28613 -3.3252 -2.07812 -2.49316 -3.5332 -3.11719 -5.40332 -6.02637 -4.15625 -3.11719 -3.74023 -4.36328 -5.19531 -4.57129 · " 1075 8 . 7, 1 075 '. J 10793.3, 10792.2, 10800.3, 10799.3, 10826.1, 10822.1, 10830, 10826.5, 10848.2, 10843.3, 10858.4, 10854.9, 10875.5, 10869.9, 10880.9, 10875.7, 10895.8, 10891.7, 10910.4, 10905, 10929.3, 10924.9, 10960.8, 10957.9, 10990.4, 10984.8, 10998.5, 10992.5, 11004.3, 10998.5, 11027.4, 11021.2, 11042.4, 11036.6, 11067.6, 11061.4, 11101.2, 11094.4, 11111.2, 11104.1, 11120.1, 11114.5, BASE CURVE: GROH, Tape Subfile: 1 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 -4.7793 -1. 03906 -1. 03906 -3.94824 -3.5332 -4.9873 -3.5332 -5.61035 -5.19531 -4.15625 -5.40332 -4.36426 -2.90918 -5.61035 -6.02637 -5.81934 -6.23438 -5.81836 -6.23438 -6.8584 -7.06543 -5.61133 OFFSET CURVE: GRCX )t 147 records... 14 bytes 132 bytes *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN LCC CN WN FN COUN STAT mwd.xtf 150 BP Exploration (Alaska) Inc. F-04A Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** ! !!!!!!! !!! !!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) recorded by SWS, 02-Mar-03 *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR ROP GR ROP GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per )cord is: One depth per frame (value= 0) Datum Specification Block Sub-type is: 84 ) 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR Size Length 4 4 4 4 ------- 8 Total Data Records: 32 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 9904.000000 11206.000000 0.500000 feet **** FILE TRAILER **** Tape Subfile: 2 41 records... Minimum record length: Maximum record length: 18 bytes 4124 bytes **** FILE HEADER **** MWD .002 1024 *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN LCC CN WN FN COUN STAT raw.xtf 150 BP Exploration (Alaska) F-04A Prudhoe Bay Unit North Slope Alaska *** LIS COMMENT RECORD *** ! !!!! !!!!!!! !!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GRAX ROPS GRAX ROPS GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: Datum Frame Size is: o 12 bytes ROP GR DEPTH 9904.0000 9904.5000 0.0000 6.2268 85.2290 98.8131 Tape Subfile 2 is type: LIS ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 132 bytes 132 bytes Minimum record length: Maximum record length: 2 records... Tape Subfile: 4 BHI 01 **** REEL TRAILER **** MWD 03/09/23 435828 01 **** TAPE TRAILER **** MWD 03/09/23 54 bytes 4124 bytes Minimum record length: Maximum record length: 40 records... Tape Subfile: 3 **** FILE TRAILER **** feet Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 9905.000000 11206.000000 0.500000 31 Total Data Records: 8 ------- 4 4 4 4 ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GRAX MWD 68 1 AAPI 2 ROPS MWD 68 1 F/HR Size Length 0.500 * F FRAME SPACE = 1 is: Logging direction is ln (value= Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: One depth per frame (value= 0) Datum Specification Block Sub-type 84 ) 255) . . 9950.0000 }3130 38.5732 ) 10000.0000 24.6686 25.2307 10050.0000 33.7705 11. 0688 10100.0000 19.9490 10.2109 10150.0000 22.3322 21.0995 10200.0000 24.5578 35.2896 10250.0000 38.0689 22.6293 10300.0000 14.4542 24.2350 10350.0000 34.1748 19.6623 10400.0000 39.8066 33.1834 10450.0000 55.0560 13.5818 10500.0000 34.0483 35.6967 10550.0000 37.1414 62.3664 10600.0000 40.1828 126.9680 10650.0000 64.9965 188.8141 10700.0000 49.4623 162.9508 10750.0000 34.0098 130.2156 10800.0000 101.1091 44.8214 10850.0000 144.4690 62.3031 10900.0000 77.1421 66.0067 10950.0000 56.5751 98.1149 11000.0000 52.8295 76.9657 11050.0000 157.2324 7.2644 11100.0000 115.0526 55.0502 11150.0000 113.6213 29.3741 11200.0000 -999.2500 44.6310 11206.0000 -999.2500 -999.2500 Tape File Start Depth 9904.000000 Tape File End Depth 11206.000000 Tape File Level Spacing 0.500000 Tape File Depth Units feet , ') ) ) Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 9905.0000 85.2290 0.0000 9905.5000 98.6285 6.1224 9950.0000 26.4770 39.2019 10000.0000 21.3233 25.4481 10050.0000 30.9435 8.4750 10100.0000 24.7591 4.5393 10150.0000 20.9798 24.5414 10200.0000 24.4156 26.5633 10250.0000 19.2619 6.6550 10300.0000 21.1826 26.6062 10350.0000 21.1826 26.9991 10400.0000 28.2142 61.2886 10450.0000 -999.2500 -999.2500 10500.0000 29.6205 21. 7562 10550.0000 35.2458 53.5606 10600.0000 32.4331 111.1920 10650.0000 68.9973 170.8036 10700.0000 -999.2500 162.6047 10750.0000 -999.2500 115.1652 10800.0000 84.7653 44.4241 10850.0000 115.9035 16.8052 10900.0000 133.5578 5.8825 10950.0000 50.2389 85.9009 11000.0000 60.1465 39.9382 11050.0000 139.3946 74.9388 11100.0000 108.9233 27.9898 11150.0000 138.9052 66.8668 11200.0000 -999.2500 34.5955 11206.0000 -999.2500 44.0677 Tape File Start Depth 9905.000000 Tape File End Depth 11206.000000 Tape File Level Spacing 0.500000 Tape File Depth Units feet I ;. ) ) I Tape Subfile 4 is type: LIS