Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-100
) )
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special res can activity or are viewable
by direct inspection of the file.
:;;A¡)J.. - L C2 0 Well History File Identifier
""'n
Page Count from Scanned File: U r7- (Count does include cover sheet)
Page Count ~atches Number in Scanning Preparation: V VEl . j ~ NO
Heier;: Maria .J) Date: t.-f 17 D S Isl
If NO in stage 1, page(s) discrepancies were found: YES NO
Organizing (done)
o Two-sided 1111111111111111111
RESCAN
~olor Items:
D Greyscale Items:
DIG?L DATA
p{>iskettes, No. ,
~ther, No/Type: C. 'D I
o Poor Quality Originals:
o Other:
NOTES:
BY:
Helen (Maria )
Project Proofing
BY: Hele~
Scanning Preparation
BY: Helen ~
.~
c/o
x 30 =
Production Scanning
Stage 1
BY:
Stage 1
BY:
Helen Maria
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Helen Maria
Comments about this file:
~scan Needed
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
o Logs of various kinds:
o Other:: J /.
1/1 ()
Date: 4 1 ð~ Islr ~
I
,
Date: Lf t: () 0 151
t11~
. .,
+1
= TGTA^tfoAGES {II
(Count does not in IU. de. cover sheet)
Date: if tJ. oS;- 151
. /J I .
WID
wtP
Date:
151
I 111I1
III 1 II
Date:
151
Quality Checked
1111111111111111111
y
• STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMIS90N
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1b. Well Class:
20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory
❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions ❑ Service ❑ Stratigraphic
2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number:
BP Exploration (Alaska) Inc. 8/8/2010 ✓ 202 -100 10 -196
3. Address: 6. Date Spudded: 13. API Number:
P.O. Box 196612, Anchorage, Alaska 99519 -6612 02/23/2003 50- 029 - 20089 -01 -00
4a. Location of Well (Governmental Section): 7. Date T. D. Reached: 14. Well Name and Number:
Surface: 02/27/2003 PBU F -04A
2308' FSL, 2396' FWL, SEC. 02, T11 N, R13E, UM 8. KB (ft above MSL): 57.1' 15. Field / Pool(s):
Top of Productive Horizon:
2986' FSL, 1140' FWL, SEC. 01, T11 N, R13E, UM GL (ft above MSL): 33.28' Prudhoe Bay Field / Prudhoe Bay
Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool
3746' FSL, 1128' FWL, SEC. 01, T11N, R13E, UM 9649' 8350'
4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation:
Surface: x- 651960 y- 5973828 Zone- ASP4 11206' 9019' ADL 028280
TPI: x- 655969 y- 5974589 Zone- ASP4 11 • SSSV Depth (MD +TVD): 17. Land Use Permit:
Total Depth: x- 655941 Y 5975348 Zone- ASP4 N/A
18. Directional Survey: ❑ Yes I@ No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD):
Submit electronic and printed information per 20 AAC 25.050 N/A ft MSL 1900 (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re- DrilULateral Top Window MD/TVD:
CCL, GR, Memory CNL, MWD 1 10010' 8644'
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
0" Stove Pie Srf Surf
' 4" q9nn ny Ppirminf-g-4
133/8 "x9 -5 /8^ # / 47# K -55 / N -80 Surface 12' Surf 8075' 1 -1/4" 241 x Cla 1775 x PF II
9-5 /8" x 7" 47# / 29# N-80 Surface 10010' Surfa 86"' 12A/4"x8112" 460 sx las '
-!" 111193'1 '
24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD
If Yes, list each interval open SIZE DEPTH SET MD PACKER SET MD / TVD
(MD +TVD of Top & Bottom; Perforation Size and Number):
None 4-1/2",12.6#, 13Cr80 8607'/ 7494' 8508'/ 7412'
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Gtr DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
AJOW NOV C' 4 201D 9649' Set Whipstock
-9650' P &A with 13 bbls of 15.8 ppg Cement
27. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO:
Test Period
Flow Tubing Casing Press: Calculated OIL -BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR):
Press. 24 -Hour Rate 4
28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) A uir Yes ® No
If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lith p s or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laborato results per 20 AAC 250.071.
None
Alaska toil 08s Cas. Ciart
RBDMS OCT 0 5 ..Anchatage
Form 10-407 Revised 1212009 CONTINUED ON REVERSE n Submit Original Only
29. GEOLOGIC MARKERS (List all formations and maMV encountered): 30. IPMATION TESTS
NAME MD TVD Well Tested? ❑ Yes ® No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
Permafrost Base results. Attach separate sheets to this form, if needed, and submit
detailed test information per 20 AAC 25.071.
Top CGL 10058' 8688'
None
Base CGL 10152' 8771'
25N 10207' 8821'
25P 10213' 8827'
22P 10290' 8898'
21N 10355' 8956'
21P 10364' 8963'
Zone 1 B 10418' 9000'
14N 10426' 9004'
14P 10438' 9009'
Formation at Total Depth (Name):
31. List of Attachments: Summary of Well work and Daily Drilling Reports, Well Schematic Diagram.
32. 1 hereby certify that the foregoi7g is true and correct to the best of my knowledge. J /
Signed: Sondra S wman j ZQ,- , _Title: Drilling Technologist Dater 1 C , f
PBU F-04A 202 -100 310 -196 Prepared By Name/Number. Sondra Stewman, 564 -4750
Well Number Permit No. / Approval No. Drilling Engineer: Cody Hinchman, 564 -4468
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00).
Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 12/2009 Submit Original Only
F -0413, Well History (Pre Rig Sidetrack)
Date Summary
07/15/10 Tag TT @8582' SLM / 8607' MD, +25' Correction, SD on 2 -3/8" Lnr @ 9677 SLM / 9702' Corrected MD.
07/15/10 T /I /O = 2210/320/0/0 temp =S /I Load TBG for E -Line (CTD Prep) Pumped 5 bbls neat meth, 293 bbls 1%
KCL & 38 bbls DSL down TBG to load & Freeze Protect. Pe & Pad -Op notified upon departure.
FWP =0/880 /60/40 *Tags hung. SV, WV & SSV =S /I, MV =Open, IA & OA =OTG'
07/15/10 (E -Line: Set Whipstock) Initial T /I /O: 110/500/50 PSI Changed TOWS set depth to 9642.5' due to early
tag of tubing stub at 9685'. TOWS located at 9642.5 BOWS located at 9660'. 2 PIP tags located at
9652.5', Whipstock face set at 180 deg. Final T /I /O: 100/450/0 PSI MASTER, SWAB, SSV - CLOSED
07/16/10 T /1 /0= 0/350/0, Temp =Sl, PPPOT -T (PASS), CTD screen
External checks installed. Stung into test port (0+ psi), bled to 0 psi. Pumped through void, good
returns. Pressured void to 5000 psi for 30 min test, lost 100 psi in 15 min, lost 0 psi in second 15 min
(PASS). Bled void to 0 psi. Functioned LDS (2.5 "), all moved freely.
07/19/10 CTU # 5 W / 1.75" ct. Job scope: Mill XN nipple and P &A. Drift coil with 1 -1/4" ball. Witness BOP
weekly BOP test.
07/20/10 CTU # 5 W / 1.75" ct. Job scope: Mill XN nipple and P &A. Continue weekly BOP test. Good BOP test.
RIH w/ BOT motor & 3.80" diamond stream mill & 3.80" diamond parabolic mill. Mill out XN nipple @
8599' CTM. POH. RIH w/ 3" BD Nozzle, tag whipstock @ 9678' CTM. Online with 13 hhlc of JS R ppg
ce ment , 9 ml fluid loss, 4 h 17 min thickening time Squeezed 3 bbls of cement behind pipe Hel
squeeze pressure of 1300 psi for 30 mins cleaned out excess cement to top of whipstock with biozan.
Chase cement to surface getting 1:1 returns. Freeze protect well w/60/40 Methanol 38 bbls. Shut well in
with 550 psi on well.
07/22/10 TWO = 350/340/20/20. Temp= SI MIT T P to 1000 psi (Test Cement Integrity). Pumped 0.7
bbls of diesel to reach test pressure. Tbg. Lost 20 psi. in the first 15 min. and 0 psi in the 2nd 15 min. for
a total loss of 20 psi in a 30 min test. Bled back 1 bbl to final WHP= 40/340/20/20. SV, WV,
SSV= closed. MV IS OPEN, IA/OA/OOA = OTG.
07/24/10 Well S/I on arrival "'(Post CTD) Tagged top of cement @ 96.50' SLM w/ 3.50: cent, 2.50" S- Bailer (No
Sample). Well S/1 on departure, notified PAD operator of well status
07/26/10 T /1 /0= 375/350/0 Pressure tested lubricator to LOW: 300 PSI /PASS HIGH: 3500 PSI /PASS. Set 4- 1/16"
CIW "H" BPV #710 thru tree, 1 -2' ext. used tagged @ 102" PRE -CTD no problems.
07/27/10 T /I /O /00= 180/270NAC/0. Temp =Sl. Bleed WHP's to 0 (pre CTD). No AL. T FL @ surface. IA FL
near surface. Bled TP to bleed trailer from 180 psi to 0 psi in 10 minutes (fluid). 30 minute monitor. TP
30 minute monitor. IAP increased 5 psi. Final WHP's= 5 /5NAC /0.
SV, WV =C. SSV, MV =O. IA, OA =OTG. NOVP.
07/27/10 T /1 /0= 250/0/0 Torqued all tree flange 1 -1/4" studs (L7M non - coated) to API specs. 726 ft/lbs w /pump
#43030 set @ 5250 psi (see log for bolt movement); Pressure tested lubricator to 300 psi low /pass 3500
psi high /pass; Pulled 4" CIW BPV #710 @ 102" w/ 1 -2' ext.; Pressure tested tree against TWC to 300
psi. low /pass -5000 psi high /pass; Pulled 4" CIW TWC
#200 @ 102" w/ 1 -2' ext.; Upon completion pressure tested swab cap to 3500 psi; Pre Nordic 1.
08/05/10 T /1 /0= 60/0/0 Pressure tested SSV /master valve & lubricator to 500 psi low /pass -3500 psi high /pass; Set
4" CIW TWC #284 @ 102" w/ 1 -2' ext.; Upon completion pressure tested swab cap to 3500 psi; Pre
Nordic 1.
08/06/10 T /I /O =SSV /220/0 + /0+ Temp =Sl. Bleed OA & OOA to 0 psi /hold open bleed on OA, OOA (Rig assist).
No AL. No flowline or well house Bled OA & OOA to 0 psi in less than a min (all gas) held open bleed for
Cameron while servicing tree. Final WHPs =SSV /220/0/0.
Unable to verify SV, WV, MV position. SSV =C. IA, OA, OOA =OTG. NOVP.
08/06/10 (Well Head Repair) Replaced eight 2" studes on 20 3/4" casing spool to starting head. Torqued all L7 2"
studs to 3070 fl lbs. MIT to pressure test void.
Page 1 of 1
I - P+L`ASKA - �P
brth America a1 �f
Al
eration Sumrhary:Report'
E
Common Well Name: F-04 AFE No
Event Type: MOBILIZATION (MOB) Start Date: 8/6/2010 End Date: 8/20/2010 X3- OOVW8 -C (701,875.00 )
Project: Prudhoe Bay Site: PB F Pad
Rig Name /No.: NORDIC 1 Spud Date/Time: 2/1/1971 12:00:OOAM Rig Release:
Rig Cont NO C ALISTA UWI: 500292008900
Active Datum: 4 : 04 2/2/1971 00:00 @57.1ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr) (ft)
8/612010 08:00 09:00 1.00 MOB P PRE MOVE RIG FROM BACKSIDE OF F PAD TO
FRONT SIDE OF F PAD. SIMULTANEOUSLY, PREP
GRAVEL IN FRONT OF WELL.
09:00 09:35 0.58 MOB P PRE WHILE GETTING PERMIT SIGNED, 8 STUDS NOT
MEETING API SPEC ON 13 -5/8 "x18 -5/8" CASING
FLANGE (OOAxOA) WERE NOTICED. WELL
HOUSE FLOOR GRATING WAS OBSTRUCTING
THE WELLHEAD INSPECTION PRE RIG.
SET RIG DOWN. GREASE CHOKE MANIFOLD &
REEL HOUSE HARDLINE VALVES, GREASE
CHOKE °& KILL HCR. C/O GRIPPER BLOCKS ON
INJECTOR. REPLACE PACKING IN MUD PUMP #1.
SPOT OFFICE TRAILER. CLEAN UP AROUND
F -47'. BRING SUPPORT EQUIPMENT FROM F -47
TO F -04.
09:35 09:45 0.17 MOB C PRE PJSM REGARDING WELLHEAD WORK WITH
CAMERON WELL HEAD TECHS (4), DHD TECH
(1).
09:45 11:00 1.25 MOB C PRE SPOT BLEED TRAILER NEXT TO WELLHEAD.
PLACE CELLAR BOARDS FOR CASING FLANGE
ACCESS. BLEED OFF OA & OOA FROM O+ +PSI.
LEAVE OPEN BLEED ON OA & ODA, MONITOR
SAME DURING JOB BY DHD TECH. WIRE BRUSH
& PLACE KROIL OIL ON ALL CASING STUDS.
WAI FOR PROPER WRENCH
11:00 13:10 2.17 MOB C PRE ONE AT A TIME, REPLACE 8 STUDS & ADJUST
j THE R EST TO MEET API SPEC.
13:10 14:30 1.33 MOB P PRE SET DOWN T -MATS AROUND TREE. SPOT RIG
i
OVER WELL. PULL TREE CAP. ACCEPT RIG AT
14:30 16:30 2.00 MOB P PRE I NU BOPE. RU,A & OA TRANSDUCERS & CRASH
FRAMES. SPOT CUTTINGS BOX. RESPOT OFFICE
TRAILER.
16:30 16:50 0.33 MOB P PRE PJSM REGARDING SWAPPING OUT REELS.
16:50 18:00 1.17 MOB P PRE SWAP OUT 2 -3/8" CT FOR 2" CT.
18:00 23:00 5.00 BOPSUR P PRE START BOP TEST, RIGGING UP INNER REEL IRON p
AND BULKHEAD JUNCTION BOX.
BOP TEST WITNESS WAIVED BY BOB NOBLE
(AOGCC INSPEC
23:00 00:00 1.00 BOPSUR N RREP PRE PUMP OUT STACK AND REPAIR UPPER PIPE RAM
DOOR SEAL.
8/7/2010 00:00 05:00 5.00 BOPSUR P PRE CONTINUE TESTING BOPE. 7- 1/16 "x4 - 1/16"
FLANGE IS LEAKING.
Printed 8/9/2010 8:50:40AM
Adftk
tcrrkt America - Al -AKA - BP _a Qt 2
4peratiic�n Suml»r�% Report
Common Well Name: F -04 DIMS AFE No
Event Type: MOBILIZATION (MOB) Start Date: 8/6/2010 End Date: 8/20/2010 X3- OOVW8 -C (701,875.00)
Project: Prudhoe Bay Site: PB F Pad
Rig Name /No.: NORDIC 1 Spud Date/Time: 2/1/1971 12:00:OOAM Rig Release:
Rig C ontractor: NORDIC CALISTA UWI: 500292008900
Active Datum: 4: 04 2/2/1971 00:00 @57.1ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
(hr)
05:00 - 09:00 4.00 BOPSUR N RREP PRE SUCK DOWN BOP STACK, REMOVE CHINA HAT.
REMOVE HOT TUB. RU BOP SLINGS TO BLOCKS
& ATTACH TO BOP'S. BREAK 7- 1/16 "x4 - 1/16"
FLANGE BOLTS. LIFT STACK & REPLACE RING
GASKET. SET BOP'S DOWN. INSTALL & TIGHTEN
i
FLANGE BOLTS. REMOVE LIFT SLINGS. INSTALL
CHINA HAT & HOT TUB. FILL STACK WITH
WATER. SHELL TEST BOP STACK.
09:00 - 13:00 4.00 BOPSUR P PRE CONTINUE TO TEST BOPE PER AOGCC REGS
250PSI /350OPSI - PASS.
13:00 13:25 0.42 BOPSUR P PRE PJSM REGARDING PULLING TWC.
13:25 13:50 0.42 1 BOPSUR P PRE HOIST DSM EQUIPMENT TO RF. MU DSM
LUBRICATOR. STAB ONTO WELL.
13:50 14:20 0.50 BOPSUR P PRE PRESSURE TEST DSM LUBRICATOR
250PSI /3500PSI'' PASS
14:20 14:25 0.08 BOPSUR P PRE PULL TWC. RECOVERED 4" H TWC.
14:25 14:40 0.25 BOPSUR P PRE RD DSM LUBRICATOR.
14:40 14:55 0.25 BOPSUR P PRE PJSM TO PU INJECTOR AND PUMP SLACK.
14:55 18:15 3.33 BOPSUR P PRE PU INJECTOR
i
18:15 18:45 0.50 BOPSUR P PRE BOOT ELINE
18:45 19:30 0.75 BOPSUR P PRE FILL COIL WITH FRESH WATER.
19:30 20:00 0.50 BOPSUR P PRE LOTO REEL. CLOSE INNER REEL VALVE.
PRESSURE TEST SURFACE LINE. 50OPSI LOW /
4000PSI HIGH _
20:00 20:15 0.25 BOPSUR P PRE PJSM TO CUT COIL. PUMP SLACK INTO REEL AT
2.8BPM.
20:15 21:00 0.75 BOPSUR P PRE CUT 300' COIL.
21:00 21:30 0.50 BOPSUR P PRE MU BOT CTC AND PULL TEST TO 30K.
21:30 21:50 0.33 BOPSUR P PRE MU STINGER AND SWIZZLE STICK, STAB ON
(} WELL AND PUMP SLACK FO RWARD. _
21:50 22:50 1.00 BOPSUR P PRE TOOK 7 BBLS TO FILL WELL. POP OFF WELL
HEAD AND WATCH FOR FLOW. TEST ELINE FOR
— CONTINUITY- TEST GOOD. REHEAD BHI. NO
j FLOW. —
22:50 23:20 0.50 BOPSUR P PRE MU PLATE AND TEST UQC TO 4000PSI.
23:20 23:50 0.50 BOPSUR P PRE MU WINDOW MILLING BHA - WINDOW MI
STRING MILL, EXTREME MOTOR, CENTRALIZER,
j 2 JTS PH6, BLIND SUB, DGS, DIPS, EDC, PC,
WEAR SUB, LQC, UQC AND CTC.
23:50 00:00 - 0.17 BOPSUR P PRE STAB INJECTOR ON WELL AND PUMP SLACK
FORWARD AT 2.34BPM.
Printed 8/9/2010 8:50:40AM
.Arrlerwa ALASKA: SP page_
poration Sum��ry:Repart
Common Well Name: F -04 DIMS AFE No
Event Type: RE- ENTER- ONSHORE (RON) Start Date: 8/7/2010 End Date: 8/14/2010 X3- OOVW8 -C (1,270,700.00 )
I
Project: Prudhoe Bay Site: PB F Pad
Rig Name /No.: NORDIC 1 Spud Date/Time: 2/1/1971 12:00:OOAM Rig Release:
Rig Co ntr ac t o r: N O R D I C CALISTA UWI: 500292008900
Active Datum: 4 : 04 2/2/1971 00:00 @57.1ft (above Mean Sea Level)
Date From - To j Hrs Task Code NPT NPT Depth Phase Description of Operations
_ (hr) (ft)
8/8/2010 00:00 02:00 2.00 STMILL P WEXIT RIH WITH WINDOW MILLING BHA #1
02:00 04:00 2.00 STMILL P WEXIT LOGGING A TIE IN PASS FROM 8500' DOWN TO
8700' AT 1.5FPM. CORRECTION -25'
04:00 05:45 1.75 STMILL P WEXIT TAG WHIPSTOCK AT 9,649' AND DISPLACE
WELLBORE TO 10.3PPG SODIUM BROMIDE MUD
X7. 05:45 18:00 12.25 STMILL P WEXIT TIME MILL WINDOW FROM 9648.9FT
USING 10.2PPG FLO -PRO AT 2.11 BPM13675 FS,
�•� - {� 100- 20OPSI MW, 1 FT /HR ROP, 2.0 -2.5K WOB,
11 PPG ECD, PVT 346. BLEED OFF IA FROM
55OPSI TO 9OPSI IN 5 MIN TO TIGER TANK. BLEED
OFF OA TWICE FROM 20OPSI TO OPSI IN 2 MIN
TO SLOP TRAILER, ODA TRACKED SAME. BEGIN ��
MIXING ASPHASOL & RESINEX INTO MUD
SYSTEM. 30OPSI INCREASE AFTER MIXING WAS
COMPLETE. r+_ off./
18:00 21:20 3.33 STMILL P WEXIT CONTINUE MILLING WINDOW AT 9655.4' r
2.11 BPM, 2.0 -3.OK WOB, PVT =348
LOOKS LIKE THE CENTRALIZER ABOVE THE
MOTOR IS HANGING UP ON THE TOP OF THE
WHIPSTOCK, TRYING MORE WEIGHT TO GET
�i OVER THE HANG UP. M ILLED OFF NICE.
21:20 23:10 1.83 STMILL P WEXIT CONTINUE MILLING WINDOW AT 9656.1'
2.11 BPM, 1.3 -1.5K WOB, PVT 347
MILLING OFF AND TAKING ANOTHER BITE
_ _ EVERY 9 MINUTES.
23:10 00:00 0.83 STMILL P WEXIT DRILL RAT HOLE FROM 9,656.8'to 9,663'.
8/9/2010 00:00 01:20 1.33 STMILL - P WEXIT FINISHED MILLING WINDOW AND 10' OF KINGAK.
MU SAMPLE SHOWS SHALE.
01:20 01:30 0.17 STMILL P WEXIT BACK REAM UP AND DOWN THREE TIMES AT
1FPM.
01:30 02:05 STMILL P WEXIT DRY DRIFT THROUGH WINDOW CLEAN. POOH.
02:05 02:30 0.42 STMILL P WEXIT LOG UP FROM TUBING TAIL TO FIRST GLM.
MINUS 18' CORRECTION TO TUBING SUMMARY
DATED 9/12/2008.
1 02:30 04:00 1.50 STMILL P WEXIT POOH
04:00 04:30 0.50 STMILL P WEXIT LID MILLING BHA #1. MILLS WERE 3.79" NO -GO.
04:30 05:00 0.50 DRILL P INT1 PJSM TO MU BHA #2.
FLOW CHECK WELL- NO FLOW.
05:00 05:30 0.50 DRILL P INT1 MU BHA #2 (3" BICENTER BIT, X -TREME MOTOR,
HOT, DGS, DPS, EDC, POWERCOMMS, SUB
WEAR PROTECTION, LQC, UQC, CTC).
05:30 07:10 1.67 DRILL P INT1 STAB INJECTOR AND RIH. CIRC MIN RATE
THROUGH THE BIT 0.24BPM /1040PSI.
07:10 07:50 0.67 DRILL P INT1 LOG DOWN FOR TIE -IN FROM 850OFT. PLUS
24.5FT CORRECTION. _
07:50 08:20 0.50 DRIL�P INT1 CONTINUE TO RIH, PUMP MIN RATE THROUGH
BIT AT 0.25BPM /102OPSI.
Printed 8/9/2010 8:51:13AM
TREE Cw
WELLHEAD McEVOY
E5 WELL ANGLE> 70 @ 104117'
E
ACTUATOR BAKER C Rom TUBING-
*
KB. ELEV = 57.1' PJC DRAR F-04B ��4 "E 1 H T
BF. ELEV = 39.1 T
KOP 3000
Max Angle 96 @ 10812 30" CONDUCTOR 95'
Datum MD = 10193' 13-3/8" PATCH
ROSS CSG PA��
Datum TV D 8800` SS
193
113-3/9' CSG, 72#, N-80 BTRS, ID = 12-347" :j N 2 000'
19-5/8" CSG, 47#, NT-80S, NSCC, ID 8.681 2000' 2022' -1 13-318" X 9-518" XO, ID = 8.681
118-5/8" CSG, 96.5#, K55 BTRS, ID = 17.656' 2004'
113-316' CSG, 68#, K-55, ID = 12A15" 2022' 2088'
1 4-1/2" TBG, 12.6#, 13CR-90 VA M ACE XO 2068' GAS LIFT MA NDRELS
13CR-90 VA M TOP F�l MD TV D DEV TYPE I VLV I LATCH I PORT I DATE
3 3387 23 KBG-2 DOME BK 16 08128/10
2 6631 5919 39 KBG-2 SO BK 20 08/28/10
@ 1 8418 7338 35 KBG-21 DMYY ISBK-21 0 109112108
Minimum ID = 1.780" 8573'
- S 1
2.70" BTT DEPLOYMENT SLEEVE 12 - HE X ID= 3.$1 3
X 4-112" BKR S-3 PKR, ID = 1870'•
-fZ1 /2 - HES X NIP, ID = 3.813
��370
PJD=2
8531'
8534 ;
�1/2
8539'
8573' 210" BTT DEPLOY SLV, ID = 1.78#1" 8594!
1 4-112`T13G, 12.6#, 13CR-80 VA M TOP,
-0152 bpf, ID = 3.958 586or
7"TBG,26#,L-8OU4S,.0383bpf,ID=6.276'- 8642' - F7 -- PBR OF), —ID BEHND
8656' 9-518'X 7" LTP, ID = ?? CT LNR
8664! I-J9-5/8 X 7 SEAL XSSY: ID = ??
19-5/8" CSG, 47#, N-80 SIL, ID = 8.681" 9312` 8775' -1 9-518" x r TrvV LTP w /LNR H6R, ID ==-?
- 7" MILLOUT WINDOW (F-0413) 9647 9655
14-1/2" X 7" BKR WHIPSTOCK (07/15110) 9642'
F7 LNR, 29#,N-80S/L,.0371bpf,]D=6.184'
ESTIMATED TOC SCMT (08/18/OE) J-J9762'�
10726' 2 - 318" MA RKER JOINT
PERFORATION SUMMARY
REF LOG: SWSMEMCNL/GRON08120/10
ANGLE AT TOP PERF: 94* @ 10680'
Note: Refer to Production DB for historical perf data 116 - 4P -- 13T51
SIZE SPF INTERVAL Opn/Sqz DA TE
1.56" 6 10680 -11010 0 08/20110
1 .56 6 11060 -11200 0 08/20/10
1.56 6 11460 -11660 0 08/20110
E-316' LNR, 4.70#, L-80 STL, 0039 bpf,.ID = 1 .992" 1 11679'
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
06126176 ORIGINAL COM 0
PLETION 08/30/10 JLJ1AGR GLV 0 (013/28/10) WELL F-04B
67110187 NlES RIND 08131110 PJC DRLG DRAFT CORRECTIONS PERMIT No: X100870
03103/03 NORDIC 2 CTD SIDETRACK (F-04A) A R No: 50-029-20089-02
09/14108 N4ES RWO 3XI SEC 2, T1 N, R1 3E, 2308'FSL & 2396 FWL
NORDIC I CT11
108122/10 1 SIDETRACK (1744B) SP Exploration (Alaska)
1081241101 PJC 1DRLG DRAFT CORRECTIONS 1
•
•
~l~Qu s 0~ l~~Q~~3Q /.E,.Po,.E..~o~a~.
John McMullen
Engineering Team Leader ~ .,,~ ,~~ ~ << ,; t~
BP Exploration (Alaska), Inc.~Y ~'~' ~~` '~ ~ ~` ~~,``~ ~~ ~Ov
P.O. Box 196612 ~~
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-04A
Sundry Number: 310-196
Dear Mr. McMullen:
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause shown,
a person affected by it may file with the Commission an application for
rehearing. A request for rehearing is considered timely if it is received by 4:30
PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend. A person may not appeal a
Commission decision to Superior Court unless rehearing has been requested.
Sincerely,
Daniel T. Seamount, Jr.
,,~ Chair
DATED this ~ day of July, 2010.
Encl.
STATE OF ALASKA
~~~~ ALASK~L AND GAS CONSERVATION COMMIS~I
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280
-,~%~'
6 -~?~/a
1. Type of Request:
^ Abandon . ®Plug for Redrill ^ Perforate New Pool ^ Repair Well ^ Change Approved Program
^ Suspend ^ Plug Perforations ^ Perforate ^ Pull Tubing ^ Time Extension
^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate ^ Alter Casing ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. _ ®Development ^ Exploratory 202-100 '
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20089-01-00'
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PI3U F-04A -
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. Field /Pool(s):
ADL 028280 ~ Prudhoe Bay Field / Prudhoe Bay Oil Pool
1 L PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
11206' - 9019' ~ 11157 ~ 901 T ~ None None
Casin Len th Size MD TVD Burst Colla se
Structural
Conductor g ' '
Surface 2004' 18-5/8" 2004' 2004' 930 70
Intermediate 9312' 13-3/8" x 9-5/8" 9312' 8075' 3450 1950
Production 1 1 7" 1 1 44' 6870 47
Liner
Liner 2710' 2-3/8" ' - 11193' 8392' - 901 11200 1178
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
10540' - 11020' 9029' - 9014' 4-1/2", 12.6# 13Cr80 8607'
Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV 8508' / 7412'
MD (ft) and TVD (ft):
12. Attachments: 13. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch '
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: July 6, 2010 ^ Oil ^ WINJ ^ WDSPL Plugged
16. Verbal Approval: Date: ^ Gas ^ GINJ ^ GSTOR ^ Abandoned
r
~ Suspended
^ WAG ^ SPLUG
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Ron Philli s, 564-5913
Printed Name John ul en Title Engineering Team Leader
Prepared By Name/Number:
Signature ~.~~ Phone 564-4711 Dater ~~ ' ~ ~ Terrie Hubble, 564-4628
Commission Use Onl
Conditions of approval: N tify Commission so that a representative may witness ~~ ~ ~a
Sundry Number:
^ Plug Integrity BOP Test ^ Mechanical Integrity Test ^ Location Clearance
, s`
~ 3 500
Qo~' st-
~
.
Other: y~ Z Sao
rssc. ~hK~ C S ~ C ~'~".~n'`
~
R~CE~~V~D
Subsequent Form Required: < O_ L~/d
Alaska Ail ~ r~ ~~~• Commission
~nGh~r~p
APPROVED BY
Approved By: COMMISSIONER THE COMMISSION Date
Form 10-403 RecJtib1/aL+,~ ,~~ O n ~;;j~~i ~ ~_ 7 /~ Submit In Duplicate
C~
J
CJ
by
To: Alaska Oil & Gas Conservation Commission
From: Ron Phillips
CTD Engineer
Date: June 22, 2010
Re: F-04A Sundry Approval
Sundry approval for well F-04A is requested to squeeze cement past whipstock into perforations. The
original 1971 vintage F-04 reached GOR in 2001. The 2003 CTD Sidetrack F-04A was shut in for
integrity in 2006. In 2008 a RWO was performed to cut and pull the production liner and change out
the tubing.
REASON FOR SIDETRACK
Sidetrack to gain access the Ivishak Zn 1 reservoir to the west in an unswept portion of the reservoir.
The proposed plan for F-04A is to drill a through tubing sidetrack with the Nordic 1 Coiled Tubing
Drilling rig on or around September 01.2010. The existing perforations will be isolated by the pre-rig
cement squeeze past the whipstock. The sidetrack, F-04B, will exit the 7" liner drill a 4.25" hole
through the Kingak, run a 3-3/16" liner across Kingak_and drill a 3" hole to the target in the Ivishak
Zone 1 A/1 B. The following describes work planned and is submitted as an attachment to Form 10-
403. Aschematic diagram of the proposed sidetrack is attached for reference.
Ct7,~~r (~~~ /l'rDGlvtt>~~, vr.a5 f~~~~~ ~~~1-~~~,
Pre-Rig Work. (scheduled to begin July 6, 2010) ~? r
1. Dummy GLV's. 1 ,~' rc~ r
~~ ~,~ Sti~~ ;'n , /~
2 ~~uf i~~ti5-~ r
2. MIT-IA, -OA. ~~, rct' c~~J no uvJ nPN. wYll~U~-~ >lr~Y/q
3. Run dummy whipstock drift to top of jet cut 2-3/8" liner C~ 9,700'. ~:~r~~~.p Fr~~~~-~.bs, ~~~ ~Pcv~p~y ~~~,~
a. 2-3/8" liner pulled Sept 11, 2008
"
" ; ti-s FU~~'-~~ ~-~
' >~~ ~''
4. Set Baker 4-1/2
x 7
through tubi
ng WS, set LS(+/-30 degs) orientation C~ 9,680
.
'
" ~~~ ~`/~a
~ ~
5. •
Mill XN nipple at 8,594
to 3.80
.
6. Squeeze 13 bbls of 15.8 ppg cement past WS at 9
680'.'
7. ,
Pressure test Tubing to 1,000 psi for 10 minutes.
8. Test: PPPOT-T. Torqued LDS.
9. PT MV, SV, WV.
10. Blind and bleed lines, remove well house, level pad.
`~~
Rig Work: (scheduled to begin on September 01, 2010)
1. MIRU and test BOPE to 250 psi low and 3500 psi high.
~. nnui ~.ts., wmaow at y,~~u~ ana i u~ of ratnoie.
3. Drill Intermediate: 4.125" OH, 90' (12 deg/100 planned)
4. Run 3-3/16" uncemented solid liner to cover up the Kingak, cross over from 3-3/16" to 3-1/2" just ~-t-~
inside window, leaving TOL at 8,550'.
5. Drill Lateral: 3" OH, 1,770' (15 &12 deg/100 planned).
6. Run 2-3/8" solid liner leaving TOL at 8,510'.
7. Pump primary cement leaving TOC at 10,000', 8.3 bbls of 15.8 ppg liner cmt planned
8. Cleanout liner to PBTD.
9. MCNL/GR/CCL log.
10. Perforate liner per asset instructions (600').
11. Set Liner Top Packer at 8,510'.
12. Freeze protect well, RDMO
•~ ~ •
Post Rig:
1. Re-install well house and attach production lines.
2. Pull BPV
3. Run GLV's
4. Test separator? (600' of perfs)
Ron Phillips
CTD Engineer
564-5913
CC: Well File
Sondra Stewman/Terrie Hubble
„~ TREE z CTe'!
WEi'LHFAD= AAcEI/OY
ACTUATOR = BAKER C
KB. ELEV = 57.1'
39:~
KOP = 3000'
IUFax Angle = 96° ~ 10812'
Datum MD = 10246'
Datum TV D = 8860' SS
30" C(SFDl.1GTOR
13-3/8° CSG, 72~, F~F80 H~TRS, D = 12.347" H 1934'
9-5/8° t:SG; 47#, FISCC; D = 8.681' 2000'
18-518" CSG, 36.5#, K55 BTRS, D =17.655" 2004'
13-318" C^sG, 68#, K-55. D = 12.415" 2022'
41/2" TBG, 12.611, 13CR-80 VAM ACEXO 206$'
13CR-80 VAMTOP
Minimum !D =1.995" @ 9700'
TOP OF 2-3~" LINER
F-04A
111" FES X NP, D = 3.8'13'
T X 4111' BKR S-3 RCR, D = D = 3.870'
4-1/2" TBG, 12.6#, 13Ci~80 VAMTOP,
.0'152 hpf, D = 3.358
7" TBG, 26#, L-80, .0383 Dpf', D = 6.276"
ES. "'41!2' C-#tO1~lETL181WG""'
1934' 133!8' BAASCN ROSS f~G PATCM
2000' 9.5f8• x T x0, D = 6.276•
20'12" 133!8' x. 9.518' XO, D = 8.681'
208$' 411?" }ES ~( t~ D = 3.813'
GAS LFT IYIANDfiaS
ST ND ND DEV TYF~ VLV LAT F+OKT DATE
3 3410 3387 23 KGB-2 DONE BE]C 18 09!24108
2 6&31 3919 39 KGB-? SO SB1C 20 09124108
1 8418 7338 35 KGB-2 DMY BK- 0 09/12!08
8531' H41/2"kESXNP,D=3.813'
$594' 41 CI' tfS XN t~ D = 3.725'
$607' 41.12" YJLEG, D= 3.,958'
$642' T PBR {40~, D=
~$2' T BOT Lt~t TOP PKR, D = ?
$77$' H~-5/8' ~(T TNY LTPw /LNR HGR, D = ?
~9-518" CSG, 47#, 1x80 Sll, D= 8.681'
TOP OF 2-318' LNR ( JET CDT (08128108)
PEFiFf~tATK)N SUk1rW RY
REF LOG: SVVS NEArI (~ ON 03/01!03
ANGLEAT TOPFfRF' 90° @ 10540'
Ncite: Refer to Ftoduction DB far hisiarical De-f data
SIZE SPF IMERVAL Opn/Sgz DATE
1-112" 4 10540 - 10610 O 03102/03
1-112" 4 t 0700 - 10850 O 03102103
1-112° 4 10330 - 11020 O 03/02103
T LNR 231#, Nr80 S/l, .0371 hpf, D = 6-184'
9762° ES?MATIDTOPOF CHrH1T
SCNJT (08118!06}
99()9' TMARKERJT
NiLOU7 YV~DOYV {F-04A) X0014' - '10016'
I 1115T I
Ltd 4.6~, L-80 STL, -0039 Dpf, D = 1.995'
DATE REV BY C?OMuBfTS OIATE REV BY t:OR4~3JCS
06126!76 ORIGINAL COM PLETIOW 12115108 }iWl P.1C DRL6 L)IFtAFT TIONS
07M0187 Nt ES RYYO
03103/03 NORDIC 2 CTD SIDETRACK (F-04A)
09tf4108 WOES RYMO
09/24108 JL,YTLH GLV C10
11/18/08 HWI.lND DRLG [?RAFT GQE~EGT10M5
PRUDFiOE BAY 1.11\YT
YVELL: F-04A
iT N~: 2021000
APf No: 50-029-2008801
SEC 2, T1 t h1, R13E, 2308` FSL 82336' FVYL
BP EYploratwn (Alaska)
TREE = CNV
ELLHEAD= McEVOY
ACTt1ATOR = BAKER C
KB. ElEV = 57.1'
BF. ELEV = 39.17'
KOP = 3000'
Max Angle = 96° @ 10812'
Datum MD = 10246'
Datum TV D = 8800' SS
30" CONDUCTOR
~O~ ~ SAFETYI~SS: "*4-112" CHROMETUBING'*'
Proposed CTD Sidetrack
13-3/8" CSG, 72#, N-80 BTRS, ID = 12.347" I-~ 3 y-,34'
9-5/8" CSG, 47#, NSCC, ID = 8.681" 2000
18-5/8" CSG, 96.5#, K55 BTRS, ID = 17.655" 2004'
13-3/8" CSG, 68#, K-55, ID = 12.415" 2022'
4-1/2" TBG, 12.6#, 13CR-80 VAM ACEXO 2068'
13CR-80 VAM TOP
Minimum ID =1.995" @ 9700'
TOP OF 2-3/8" LINER
4-1/2" HES X NIP, ID = 3.813"
8508' I~ 7" X 4-1 /2" BKR S-3 PKR, ID = ID = 3.870"
4-1/2" BKR KB LTP, ID = 1.375" ' 8500
TOL 2-3/8" 8510
TOL 3-3/16" 8550 8531 4-1/2" HES X NIP, ID = 3.813"
d t
= 3
80"
ID
ill
1/2" HES XN NIP
' 4
4-112" TBG, 12.6#, 13CR-80 VAM TOP, 8607 .
m
e
o
,
8594
-
8fi07' 4-1/2" WLEG
958"
ID = 3
.0152 bpf, ID = 3.958 .
,
40'
ID = ?
42' 7" PBR
f
ID = 6
276" $680'
0383 b
7"
26#
L
80
G (
),
86
,
.
p
,
-
, .
TB
, $6$2' 7" BOT LNR TOP PKR, ID = ?
8775' 9-5/8" X 7" TNV LTP w /LNR HGR, ID = ?
9-5/8" CSG, 47#, N-80 S/L, ID = 8.681" I~ 9312'
a-1/z" x 7"whipstock ~ 96$0'
TOP OF 2-3/8" LNR / JET Cllr (08/28/08) 9700'
PERFORATION SUMMARY
REF LOG: SWS MEM CNL ON 03/01!03
ANGLE AT TOP PERF: 90° @ 10540'
Note: Refer to Roduction DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
1-1/2" 4 10540 - 10610 O 03/02/03
1-1/2" 4 10700-10850 O 03/02/03
1-1/2" 4 10930-11020 O 03/02/03
7" LNR, 29#, N-80 S/L, .0371 bpf, ID = 6.184"
5$z
~~~,a/
L~,..~/'
`~
~ 13-3/8" BAASCH ROSS CSG PATCH ~
2000' --~ 9-5/8" X 7" XO, ID = 6.276"
2022' 13-3/8" X 9-5/8" XO, ID = 8.681"
20$$' 4-1/2" HES X NIP, -D = 3.813"
GAS LIFT MANDRELS
ST MD TV D DEV TYPE V LV LATCH PORT DATE
3 3410 3387 23 KGB-2 DOME BEK 16 09/24/08
2 6631 5919 39 KGB-2 SO SBK-2 20 09/24/08
1 8418 7338 35 KGB-2 DMY SBK-2 0 09/12/08
3-1/2" XO to 3-3/16" ~ 9650'
3-3/16" LNR, 6.2#, L-80 TGII, ID = 2.786" 9770'
10000' PLANNED TOC 2-3/8" LINER 3" HOLE
2-3/8" LNR, 4.6#, L-80 STL, .0039 bpf, ID = 1.995" I-I 11560'
9762 ~-~ ESTIMATED TOP OF CETAENT SCMT (08/1 t
TSGR 9 '
MILLOUT WINDOW (F-04A) 10010' - 10016'
2-3/8" LNR, 4.6#, L-80 STL, .0039 bpf, ID = 1.995"
DATE REV BY COMMENTS DATE REV BY COMMENTS
06/26/78 ORIGINAL COMPLETION 12/15/08 HW/ PJC DRLG DRAFT CORRECTIONS
07/10/87 N1 ES RWO 03/18/10 MSE PROPOSED CTD SIDETRACK
03/03103 NORDIC 2 CTD SIDETRACK (F-04A)
09114/08 N4ES RWO
09/24/08 JLJ/TLH GLV GO
11/18/08 HW/JMD DRLG DRAFT CORRECTIONS
PRUDHOE BAY UNIT
WELL: F-04B
PERMff No:
API No: 50-029-20089-02
SEC 2, T11 N, R13E, 2308' FSL ii< 2396' FWL
BP Exploration (Alaska)
~~~
STATE OF ALASKA /o:~~~
OIL AND GAS CONSERVATION COMMI~N
REPORT OF SUNDRY WELL OPERATIONS
~:~ (~~ i ~ ~ L008
1. Operations Performed: ~id5~i8 ~ii +~x ~8 9 COflB, ~O
^ Abandon ®Repair Well - ^ Plug Perforations ^ Stimulate ^ Re-Enter S~~~3 d1(ILell
y~
^ Alter Casing ®Pull Tubing _ ^ Perforate New Pool ^ Waiver ^ Other
^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension
2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number:
BP Exploration (Alaska) Inc. -® Development ^ Exploratory 202-100
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20089-01-00 -
7. KB Elevation (ft): 571, - 9. Well Name and Number:
PBU F-04A '
8. Property Designation: 10. Field /Pool(s):
,4d 0028280. Prudhoe Bay Field / Prudhoe Bay Pool
11. Present well condition summary
Total depth: measured 11206' - feet
true vertical 9019' , feet Plugs (measured) None
Effective depth: measured 11157'- feet Junk (measured) None
true vertical 9017'- feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 96' 30" 96' 96'
Surface 2004' 18-5/8" 2004' 2004' 930 870
Intermediate 9312' 13-3/8" x 9-5/8" 9312' 8075' 3450 1950
Production 10010' 7" 10010' 8644' 6870 4760
Liner
Liner 2710' 2-3/8" 8392' - 9018'
-9700' - 11193
' 11200 11780
I'' ll X
° {~(R
Perforation Depth MD {ft): 10540' -11020'
Perforation Depth TVD (ft): 9029' - 9014'
4-1/2", 12.6# 13Cr80 8607'
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth): 7" x 4-1/2" Baker'S-3' packer 8508'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final pressure:
Cut 2-3/8" liner at 9700'. Cut tubing at 8370'. Pulled tubing and liner. Clean out and then run new Completion.
13. Re resentative Dail Avera a Production or In'ection Data
Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation:
Subsequent to operation: 505 15,450 179 750 250
14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: -
^ Explorato ®Develo ment ^ Service
® Daily Report of Well Operations
16. Well Status after work:
® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt:
Contact Howard West, 564-5471 nyA
Printed Name T rie Hubble Title Drillin T®chnolo ist
l p
Prepares ay NameMumber
Si nature Phone 564-4628 Date ~
Terrie Hubble 564-4628
Form 10-404 Revised 04/2006
_ ~~~~,
Submit Original Only
nmissiorl
~-`~~,
s
Digital Well File
Well: F-04
Well History
• •
Well Date Summary
F-04A 8/26/2008 *** WELL SI ON ARRIVAL'** (pre rwo)
RIH W/ 2.80" CENT & 2.50" LIB TO TAG WRP
*** JOB IN PROGRESS/ CONT ON 08-27-08 WSR
F-04A 8/26/2008 T/I/O/00=50/100/60/140 Temp =SI CMIT Tx IA PASSED to 3500 osi (Pre RWO) Pumped 22 bbls crude
down IA to reach test pressure. On 3rd test, Tbg gained 20 psi, IA lost 0 psi in 1st 15 mins and T/IA lost
0/0 psi in 2nd 15 mins. Bled TBG/IAP. FWHP's=150/140/60/100 ***Tags hung and wellhead valves
checked for position upon departure***
F-04A 8/26/2008 T/I/O/00 = 160/160/70/80. Temp = SI. T & IA FL (pre rig). No AL. T FL near surface, IA FL C~? 228' (13
bbl).
SV, WV shut. SSV, MV open. IA, OA, OOA otg. NOVP.
F-04A 8/27/2008 ***WELL SHUT-IN ON ARRIVAL***
INITIAL T/I/O/00= 200/100/100/100
RIGGING UP E-LINE UNIT IN PROGRESS FOR JET CUT.
HAD GREASE CREW SERVICE SWAB VALVE.
***CONTINUE ON 8/28/08 WSR***
F-04A 8/27/2008 *** CONT FROM 08-26-08 WSR *** (pre rwo)
DRIFTED W/ 2.80 CENT & 2.5 LIB TO 8010' SLM (IMPRESSION OF WRP)
RAN WRP EO SLEEVE W/ TATTLE TAIL PINS TO 8010' SLM (PIN SHEARED)
PULLED 3 1/2" WRP FROM 8010' SLM (SLIPS & ELEMENTS INTACT.I
DRIFTED W/ 1.75 CENT & S-BAILER PAST TARGET DEPTH FOR TBG CUT C~ 9700' -STOPPED C~
9800' SLM
*** WELL LEFT SI, DSO NOTIFIED OF WELL STATUS ***
F-04A 8/28/2008 T/I/0=170/80/40/100 Assist E-Line, CMIT TxIA PASSED to 1000 osi. (Pre RWO) Pumped 4.9 bbls crude
down IA &Tbg to pressure up to 1000 psi. T/IA lost 0/10 psi in 1st 15 mins and 0/0 psi in 2nd 15 mins for
a total loss of 0/10 psi in 30 mins. Bled TBG/IAP FWHP's=210/150/60/120 ***IA , OA & OOA valves
checked for position and tags hung upon departure***
F-04A 8/28/2008 ***JOB CONTINUED FROM 27-AUG-2008 WSR***
JET CUT 2-3/8" LINER @ 9700'. CORRELATED TO SLB SCMT LOG 8/18/06.
SET 3.5" WEATHERFORD WRP MIDDLE ELEMENT @ 8400' MD. (TOP OF PLUG C~ 8398' MD, 3.77'
OAL)
LRS CMIT-TxIA 1000 PSI PASSED...SEE LRS WSR.
JET CUT 3.5" TBG @ 8370' MD..
WRP & 3.5" TBG CUT CORRELATED TO TUBING TALLY 7/9/87
SWAB, SSV CLOSED, MASTER & CASING VALVES OPEN ON DEPARTURE.
FINAL T/I/O/00= 215/100/40/120
***JOB COMPLETE, WELL LEFT S/I***
F-04A 8/28/2008 Circ out TBG & IA (Pre RWO) Standby for E-Line & Hard Line Crews. ***Continued on 08-29-08 WSR***
F-04A 8/29/2008 ***Continued from 08-28-08 WSR*** T/I/0=300/100/40/100 Circ Out (RWO Prep) Pumped 1 bbl neat
meth spear & 563 bbls 9.3# Brine down Tbg taking returns up IA through jumperline to flowline. Pumped
7 bbls diesel down Tbg. U-tubed Tx IA. Freeze protected flowline with 9 bbls neat meth, 24 bbls crude
and 10 bbls heated diesel according to WOA procedure. Bled WHP's. ***Tags hung and wellhead valves
checked for position upon departure*** FWP's=0/0/0/0
F-04A 8/29/2008 T/IA/OA/OOA= SI/0/0/0 Temp= cold PPPOT-T (PASS) PPPOT-IC (PASS) PPPOT-OC (PASS) (Pre Rig)
PPPOT-T RU 1 HP BT onto THA test void, 100 psi bled to 0 psi, flushed void until clean returns
achieved. Pressured to 5000 psi for 30 minute test, 4950/ 15 minutes, 4900/ 30 minutes. Bled void to 0
psi, RD test equipment, cycled all LDS "Standard" ran out 1.5" and ran in and torqued, all functioned with
no problems.
PPPOT-IC ((9 5/8")) RU 1 HP BT on IC test void, 50 psi to 0 psi, flushed void till clean returns achieved,
attempted to pressure to 3500 psi, would not build pressure above 500 psi. RU elephant gun onto
packing port, injecting plastic into packing port until air free ribbon of plastic achieved, pressured to 5200
psi, on packing port. (2nd test) Pressured to 3500 psi for 30 minutes, 3500/ 15 minutes, 3500/ 30
minutes. Bled off test pressure to 0 psi, RD all test equipment, cycled all LDS "Standard" ran out 1.5" and
ran in and torqued, all functioned with no problems.
PPPOT-OC (( 13 3/8" )) RU 1 HP BT onto test void 200 psi bled to 0 psi, no way to flush void. Pressured
to 1000 psi for 30 minute test, 1000/ 15 minutes, 1000/ 30 minutes. Bled to 0 psi, RD all test equipment.
F-04A 9/2/2008 T/I/O/00=0+/0/0/0. Set 6" CIW J BPV #416 thru tree, pre-rig. 1-2' ext used, tagged ~ 108. No problems.
Print Date: 10/9/2008 Page 1 of 1
http://digitalwellfile.bpweb.bp. com/WIInfo/Reports/ReportViewer. aspx
Page 1 of 1
10/9/2008
•
BP EXPLORATION Page 1 of 6
Operations Summary Report
Legal Well Name: F-04
Common Well Name: F-04a Spud Date: 2/1/1971
Event Name: WORKOVER Start: 9/3/2008 End: 9/14/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 9/14/2008
Rig Name: NABORS 4ES Rig Number:
Date From - To I Hours Task Code NPT Phase Description of Operations
9/2/2008 13:00 - 00:00 11.00 RIGD N WAIT PRE
9/3/2008 00:00 - 09:00 9.00 RIGD N WAIT PRE
09:00 - 00:00 15.00 MOB P PRE
9/4/2008 00:00 - 05:00 5.00 MOB P PRE
05:00 - 00:00 19.00 MOB N WAIT PRE
9/5/2008 100:00 - 14:00 I 14.001 MOB I N I WAIT I PRE
14:00 - 16:30 I 2.50 I MOB I P
16:30 - 00:00 7.50 RIGU P
9/6/2008 00:00 - 04:00 4.00 RIGD P
04:00 - 04:30 I 0.501 KILL I P
04:30 - 06:00 1.50 KILL P
06:00 - 08:00 2.00 KILL P
08:00 - 11:00 3.00 KILL P
11:00 - 12:30 1.50 WHSUR P
12:30 - 15:00 I 2.501 WHSUR I P
15:00 - 00:00 I 9.001 BOPSURP
9/7/2008 100:00 - 01:30 I 1.501 BOPSUR P
01:30 - 06:00 ~ 4.50 ~ BOPSUq P
06:00 - 08:00 I 2.001 BOPSUR P
PRE
PRE
PRE
Prepared rig for move to PBU F-Pad.
Continued preparing rig for move to PBU F-Pad. Performed
general rig housekeeping.
Moved rig from MP I-Pad to PBU.
Continued rig move. F-04 not ready for MIRU. Well house and
flow line not prepared. Equipment on F-Pad obstructing rig
placement.
Staged rig on PBU J-Pad. Awaiting F-04 well and pad
preparation. Changed fuel pump. Installed new seals in pipe
machine. Changed out swabs and liners in mud pump.
Continue to wait on well support to build up pad for rig.
Continue maintenance on rig and painting.
Moved rig from staging area on J-Pad to F-Pad. All modules
on F-Pad at 16:30 hrs.
Spotted sub module over F-04. Build up pad with gravel
perpendicular to sub for pipe shed placement. Spot pipe shed
and jack up into position.
Scope and raise derrick. Spot pits and jack up to make up to
sub. Connect lines, RU double annulus valve.
DECOMP I PJSM. RU lubricator. P/T to 500
ressures u si au me wa across.
DECOMP Spot vac trucks and take on 1 % KCL to pits.
DECOMP Held crew change and performed pre-tour checks of PVT
system and derrick. RU to circulate, tested lines to 250 / 3500
psi.
DECOMP T/I/O = 0 psi. Circulated out diesel freeze protect fluid and
displaced well with 1 % KCI brine, taking returns to tiger tank.
OA pressure 0 psi throughout displacement. Pumped total of
459 bbls at 3-4 bpm, 540 - 1080 psi. Shut in and monitored
well; tubing and annulus dead and stable.
DECOMP Installed TWC. Tested TWC to 3500 psi for 10 charted
minutes from above and to 1000 psi for 10 charted minutes
from below. RD lines from tree.
DECOMP Bled tubing hanger void. ND production tree and tubing head
adapter flange. Functioned LDS.
DECOMP NU BOPE. Replaced single gate (blind ram) with double gate
-3/8" fixed, blind ram).. BOP components arranged from top
to bottom: Annular, 2 3/8" pipe rams, blind rams, mud cross, 3
1/2" x 6" VBR and test spool. AOGCC rep Bob Noble waived
witness of BOP test at 19:43 hrs. Function test BOP
components.
DECOMP Continue NU BOPE. Tighten up doors. Connect all lines.
Install flow riser and air up boots.
DECOMP Pressure tested all BOPE components to 250 psi low / 350_0
psi high, per BP policy and AOGCC regulations. Tested
annular and 2-3/8" fixed pipe rams with 2-3/8" test joint.
Tested VBR with 3-1/2" and 4-1/2" test joints. Test witnessed
by WSLs Vincent Volpe and Winton Aubert, Toolpushers Paul
Yearout and Don Haberthur.
DECOMP Held crew change and performed pre-tour checks of PVT
egiupment and derrick. Blew down lines and RD BOPE test
equipment.
Printed: 9/30/2008 11:55:37 AM
BP EXPLORATION
Qperations Summary Report
Legal Well Name: F-04
Common Well Name: F-04a
Event Name: WORKOVER
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 4ES
Date From - To Hours Task Code NPT
Start: 9/3/2008
Rig Release: 9/14/2008
Rig Number:
Phase
Page 2 of 6
Spud Date: 2/1/1971
End: 9/14/2008
Description of Operations
9/7/2008 08:00 - 09:30 1.50 WHSUR P DECOMP PU and MU DSM lubricator. Tested lubricator to 500 si.
Pulled TWC and LD lubricator.
09:30 - 11:30 2.00 PULL P DECOMP RU control line spooling unit. PU landing joint and XO to 7"
IJ4S pin. Screwed into tubing hanger. BOLDS. Pulled tubing
hanger free with 100k Ib PU. Secured control lines. BO and
LD tubing hanger, PU 80k Ib.
11:30 - 13:00 1.50 PULL P DECOMP CBU through 3-1/2" tubing cut at 8370'. Pumped 5 bpm at 530
psi. Had no losses nor gas in returns.
13:00 - 16:00 3.00 PULL P DECOMP POH, LD 4-1/2" tubing, spooling dual encapsulated control
lines. Recovered 48 jts 4-1/2" tubing, SSSV, 24 control line
clamps, 4 ss bands.
16:00 - 17:00 1.00 PULL P DECOMP RD and offloaded control line spooling unit. RD 4-1/2" handling
equipment and RU 3-1/2" handling equipment.
17:00 - 00:00 7.00 PULL P DECOMP POH, LD 3-1/2" tubing.
9/8/2008 00:00 - 01:30 1.50 PULL P DECOMP POH, LD 3-1/2" tubing. LD 196 total jts, 6 GLM's, 1 cut jt
(17.29').
01:30 - 02:30 1.00 PULL P DECOMP Clean and clear rig floor. Set wear ring.
02:30 - 03:30 1.00 FISH P DECOMP Conduct weekly safety meeting. Show hands ADW
performance and safety IR charts.
03:30 - 05:00 1.50 FISH P DECOMP PJSM. PUMU BHA #1: cut lip, HMC, OS, ext, bumper sub, oil
jar, POS, 9 x DC, accelarator.
05:00 - 06:00 1.00 FISH P DECOMP RIH with BHA #1, PU 3-1/2" DP. 15 jts RIH at 06:00 hrs.
06:00 - 09:00 3.00 FISH P DECOMP Held crew change and performed pre-tour checks of PVT
equipment and derrick. Continued RIH with BHA #1, PU
3-1/2" DP.
09:00 - 10:00 1.00 FISH P DECOMP Held weekly safety meeting with all day rig personnel.
Discussed safety communications, safety alerts, recent ADW
incidents, and individuals' concerns.
10:00 - 15:00 5.00 FISH P DECOMP Resumed RIH with BHA #1 on 3-1/2" DP.
15:00 - 16:30 1.50 FISH P DECOMP Tagged 3-1/2" tubing stub at 8361' DPM. LD 1 jt, PU kelly and
established parameters: PU/SO/Rot 132k/111 k/120k; 43 rpm,
140a, 2800 Ib-ft, 3 bpm, 390 psi. Rotated over and dressed
tubing stub with 1 k WOB. Stopped rotating, SO over stub 3'
with 115k Ib. Pump pressure increased 200 psi; shut down
pump. Continued SO total of 7' over stub. PU 165k Ib, jar hit.
Set grapple with 2nd 165k Ib jar hit. SO to neutral weight,
rotated 18 RH turns, got 1 turn back. PU 10k Ib over neutral
weight, rotated 2 RH turns. ,Fluid level immediately fell out of
sight and PU weight increased to 138k Ib (net gain 6k Ib).
Attempted to circulate at 2 bpm, pressure increased with no
returns. Parameters indicative of having disengaged K-anchor.
16:30 - 20:30 4.00 FISH P DECOMP POH with BHA #1, standing back 3-1/2" DP from 8361'to 317'.
Added minimum 60 b h SW to well.
20:30 - 21:00 0.50 FISH P DECOMP PJSM. LD BHA #1.
21:00 - 23:00 2.00 FISH N WAIT DECOMP Operations stopped due to IP in pipe shed. All notifications
made and traction report initiated. Took IP to MCC medical for
evaluation. IP released back to work with light duty
assignment.
23:00 - 00:00 1.00 FISH P DECOMP Cont to LD BHA #1. Tubing punch below collars prior to break
out - no ressure. Recovered a 2 jts, 15.61' cut jt, 4.5" sliding
sleeve assembly, PBR slick stick and K-anchor latch.
9/9/2008 00:00 - 01:00 1.00 FISH P DECOMP Continue to LD fish. Clean and clear rig floor.
01:00 - 02:30 1.50 FISH P DECOMP Safety shut down with WSL, Toolpusher and Nabors safety
Printed: 9/30/2008 11:55:37 AM
•
BP EXPLORATION Page 3 of 6
Operations Summary Report
Legal Well Name: F-04
Common Well Name: F-04a Spud Date: 2/1/1971
Event Name: WORKOVER Start: 9/3/2008 End: 9/14/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/14/2008
Rig Name: NABOBS 4ES Rig Number:
Date From. - To i, Hours Task ' Code ~ NPT i .Phase Description of Operations
9/9/2008 01:00 - 02:30 1.50 FISH P DECOMP man. Highlight lifting /rigging of various equipment.
02:30 - 03:30 1.00 FISH P DECOMP PUMU BHA #2.
03:30 - 05:00 1.50 FISH P DECOMP RIH from 304' to 1972'. Slight gas bubble to surface. Shut
town and AOGCC.
05:00 - 06:00 1.00 FISH P DECOMP Circulate the long way thru the choke at 5.5 BPM / 500 psi.
Gas /crude mixture with seawater returns.
06:00 - 09:30 3.50 FISH P DECOMP Held crew change and performed pre-tour checks of PVT
system and derrick. RIH with fishing BHA #2 on total of 35
stands 3-1/2" DP. CBU 3-4 bpm, 200-420 psi. Shut down
pump, monitored well, fluid level falling in annulus. Resumed
RIH with BHA #2 on 3-1/2" DP, total of 86 stands to 8330'.
Added sufficient seawater to keep annulus fluid level within
sight.
09:30 - 12:00 2.50 FISH P DECOMP CBU from 'ust above 2-3/8" liner at 8330'. Circulated 4-5 bpm
at 950-1050 psi. Shut down and monitored well, annulus fluid
12:00 - 13:00 1.00 FISH P DECOMP PU 5 singles 3-1/2" DP. PU kelly and established parameters:
PU 140k Ib, SO 105k Ib, 3 bpm, 400 psi, 15 rpm, 150a, 3000
Ib-ft. Tagged 2-3/8" liner fish at 8503' DPM. SO and
swallowed fish without rotation. Pump pressure increased 150
psi when over fish. SO total of 3' swallow, pump pressure 570
psi. PU 1/2 kelly, gained 9k Ib weight.
13:00 - 15:30 2.50 FISH P DECOMP CBU through 2-3/8" liner fish at +/- 9700'. Pumped 3-1/2 bpm
at 690 psi. Had moderate gas in returns. Pumped total of 465
bbls, until gas subsided.
15:30 - 16:30 1.00 FISH P DECOMP POH with BHA #2 and 2-3/8" liner fish. POH 15 stands,
placing 2-3/8" liner fish above 7" production packer. Monitored
well; static fluid losses about 25 boh. Continued adding
sufficient seawater to keep fluid level in sight.
16:30 - 17:30 1.00 FISH P DECOMP Held safety stand-down with Bob Mize and day rig crew.
Discussed recent incidents, general rig safety culture,
examples of desirable behaviors, and individuals' concerns.
17:30 - 18:00 0.50 FISH P DECOMP POOH & stand back 3 1/2" DP. Pull 1300' until liner is above is
above packer.)
18:00 - 20:00 2.00 FISH P DECOMP Hold safety stand down w/ all hands on night crew + Bob Mais
& Herb Williams. Discuss last night's incidents. Review what
went wrong & discuss procedures to prevent re-occurance.
incorporated 2 man rule when handling equip greater than 50#.
Con't continuous hole fill during safety meeting.
20:00 - 20:30 0.50 FISH P DECOMP Service rig. Inspect derrick. Check PVT alarms.
20:30 - 23:00 2.50 FISH P DECOMP Con't to POOH & stand back 3 1/2" DP. Use continuous hole
fill.
23:00 - 00:00 1.00 FISH P DECOMP Hold PJSM. POOH & stand back 4 3/4" DCs. Break out & UD
overshot assy & 2 3/8' liner deployment sleeve.
9/10/2008 00:00 - 02:30 2.50 FISH P DECOMP POOH & UD 2 3/8" liner. Recovered 37 joints + 16.28' cut off it.
02:30 - 03:00 0.50 FISH P DECOMP Hold PJSM. R/D 2 3/8" handling tools.
03:00 - 04:00 1.00 FISH P DECOMP Clear & clean rig floor.
04:00 - 06:00 2.00 WHSUR P DECOMP Pull wear bushing. Install test plug. R/U to test equip.
06:00 - 10:00 4.00 BOPSU P DECOMP Held crew change and performed pre-tour checks of PVT
equipment and derrick. Continued RU BOPE test equipment.
Tested annular BOP and choke manifold valves to 250 psi low /
3500 psi high, per BP policy and AOGCC regulations; test
Printed: 9/30/2008 11:55:37 AM
BP EXPLORATION Page 4 of 6
Operations Summary Report
Legal Well Name: F-04
Common Well Name: F-04a Spud Date: 2/1/1971
Event Name: WORKOVER Start: 9/3/2008 End: 9/14/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 9/14/2008
Rig Name: NABOBS 4ES Rig Number:
Date From - To ', Hours
_I Task I! Code NPT Phase Description of Operations
9/10/2008 06:00 - 10:00
10:00 - 12:30
12:30 - 15:30
15:30 - 18:00
18:00 - 18:30
18:30 - 22:30
22:30 - 23:30
23:30 - 00:00
9/11/2008 00:00 - 01:30
4.00 BOPSU P
2.50 CLEAN P
3.00 CLEAN P
2.50 CLEAN P
0.50 CLEAN P
4.00 CLEAN P
1.00 CLEAN P
0.50 CLEAN P
1.50 CLEAN P
DECOMP witnessed by D. Haberthur and W. Aubert. Tested annular with
3-1/2" test joint. BOPE test witness waived by J. Crisp,
AOGCC at 06:05 hrs 9/10/2008.
DECOMP Pulled test plug and installed wear ring. PU packer mill BHA
#3: 6" mill, 3 x boot basket, bit sub, bumper sub, oil jar, POS,
9 x DC. Fluid loss steady at about 25 bph seawater.
DECOMP RIH with packer mill BHA #3. Tagged 7" production packer at
8559' DPM.
DECOMP LD 1 jt, PU 24' DP pup and kelly. Established parameters:
PU/SO/Rot 145k/105k/123k; 80 rpm, 180a, 4000 Ib-ft; 3-1/2
bpm, 600 psi. Milled packer with 4k Ib initial WOB.
DECOMP Crew change. Service rig. Inspect derrick. Check PVT alarms.
DECOMP Con't to mill packer from 8559 to 8562'. Packer started to
move. P/U 145K, S/O 105K, Rot 123K, 50-70 RPMs, WOB
6-15K, Pumped 3 BPM @ 380 psi. Torq = 5K. Free Torq 4K.
DECOMP Circulate & pump sweep. Pump 5.4 BPM ~ 1100 psi. Pumped
total of 326 bbls.
DECOMP Hold PJSM for P/U DP & skate operations.
DECOMP P/U & single in while pushing packer. RIH w/ 8 jts. Packer hung
up ~ 8786'.
DECOMP Mill acker from 8786 to 8787' Packer dro ped. P/U 147K, S/O
107K, Rot 125K, WOB 6-12K, 50-70 RPMs, Torq 5K. 3 BPM ~
380 psi.
DECOMP Hold PJSM for P/U DP & skate operation.
DECOMP P/U & single in, chase fish to bottom C~3 9640'.
DECOMP Circulate hole clean. Pump sweep around at 5 bpm and 1300
psi.
DECOMP Held crew change and performed pre-tour checks of PVT
equipment and derrick. POH with packer mill BHA #3_. Stood
back 3-1/2" DP and collars.
DECOMP Broke out and LD BHA #3. Cleared junk baskets, recovered
about 2 gallons metal chunks, shavings and debris. PU bit and
scraper BHA #4: 6" bit, 7" scraper, 3 x boot baskets, bit sub,
bumper sub, oil jar, POS, 9 x DC.
DECOMP RIH with bit and scraper BHA #4 on 3-1/2" DP. RIH w/ 89
01:30 - 02:30 1.00 CLEAN P
02:30 - 03:00 0.50 CLEAN P
03:00 - 03:30 0.50 CLEAN P
03:30 - 06:00 2.50 CLEAN P
06:00 - 11:30 I 5.50 I CLEAN I P
11:30 - 13:30 ~ 2.00 ~ CLEAN ~ P
13:30 - 16:30 3.00 CLEAN P
16:30 - 17:00 0.50 CLEAN P
17:00 - 18:00 ~ 1.00 CLEAN ~ P
18:00 - 19:00 I 1.001 CLEAN I P
19:00 - 19:30 0.50 CLEAN P
19:30 - 20:00 0.50 CLEAN P
20:00 - 20:30 0.50 CLEAN P
20:30 - 21:30 1.00 CLEAN P
21:30 - 00:00 2.50 CLEAN P
9/12/2008 00:00 - 03:30 3.50 CLEAN P
03:30 - 04:00 0.50 CLEAN P
04:00 - 05:30 1.50 CLEAN P
05:30 - 06:00 0.50 CLEAN P
06:00 - 09:00 3.00 BUNCO
DECOMP Stand back stand 89 & work scraper over 8526 to 8432'.
Worked up & down 3 times.
DECOMP Reverse circulate hole 2 times the DP volume at 3 BPM and
400 PSI.
DECOMP Held crew change and performed pre-tour checks of PVT
equipment and derrick inspection. Serviced rig.
DECOMP Tripping out of hole and laying down DP.
DECOMP Crew held apre-job safety meeting.
DECOMP RIH with 11 stands from derrick.
DECOMP Service rig and adjust breaks on drum.
DECOMP Con't tripping out of hole and laying down DP Out of hole w/
115 jts.
DECOMP Finish POOH & LDDP. UD 298 jts.
DECOMP Hold PJSM to UD BHA.
DECOMP Break out & UD BHA #4.
DECOMP Clean out boot baskets. Clear & clean rig floor.
RUNCMP Held crew change and performed pre-tour checks of PVT
Printed: 9/30/2008 11:55:37 AM
BP EXPLORATION
Page 5 of 6
Operations Summary Report
Legal Well Name: F-04
Common Well Name: F-04a
Event Name: WORKOVER
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 4ES
Start: 9/3/2008
Rig Release: 9/14/2008
Rig Number:
Spud Date: 2/1 /1971
End: 9/14/2008
Date ~~ From - To Hours Task I Code I NPT
9/12/2008 06:00 - 09:00 3.00 BUNCO
09:00 - 18:00 9.00 BUNCO
18:00 - 18:30 0.50 RUN
18:30 - 22:00 3.50 RUN
22:00 - 00:00 2.00 RUN
9/13/2008 00:00 - 00:30 0.50 RUN
00:30 - 01:30 1.00 RU
01:30 - 06:00 4.50 RU
06:00 - 07:30 I 1.50
07:30 - 09:00 1.50 WHSUR P
09:00 - 17:00 8.00 BOPSU P
17:00 - 18:00 1.00 WHSUB P
18:00 - 18:30 0.50 WHSUR P
18:30 - 19:30 1.00 WHSUR P
19:30 - 20:30 1.00 WHSUR P
20:30 - 23:30 3.00
23:30 - 00:00 0.50
Phase Description of Operations
RUNCMP equipment and derrick. MU running tool on DP joint and pulled
wear ring. RD DP handling equipment and cleared rig floor.
RU single joint compensator, torque turn and tubing handling
equipment. Fluid loss about 10 bph seawater.
RUNCMP PU and BakerLoc'd tailpipe ass'y: WLEG, XN, 1 jt tubing, X,
S-3 packer. Continued RIH with 4-1/2" 12.6#, 13Cr80 VAM
Top tubing. Used Jet Lube Seal Guard thread compound and
U VAM Top connections to 4440 Ib-ft. 128 jts RIH at 18:00
hrs.
RUNCMP Crew change. Service rig. Inspect derrick. Check PVT alarms.
RUNCMP Con't to RIH w/ 4 1/2" 12.6#, 13Cr-80 Vam top completion.Ran
151 jts. Used Jet Lube Seal Guard thread compound. Torque
Turn all connections to 4440 ft-Ibs.
RUNCMP RIH w/ 4 1/2" 12.6#, 13Cr-80 VamAce. Continued to use Jet
Lube Seal Guard thread compound. Torque all connections to
3620 ft-Ibs. RIH w/ 40 jts.
RUNCMP Finish RIH w/ 4 1/2" 12.6# 13Cr-80 VamAce Tubing. Use Jet
Lube Seal Guard thread compound. Torque all connections to
3620 ft-Ibs. Ran 49 jts. Total joints RIH = 209.
RUNCMP PU and land 4 1/12" tubin han er, Run in lock down screws.
4.5" WLEG at 8605', 4.5" XN nipple w/ RHC-M plug at 8594',
4.5" X nipple at 8531', Baker S-3 Packer 7" x 4.5" at 8508', 4.5"
X nipple at 8487', 4.5" x1" KBG-2 GLM w/ Dummy SBK-2 Latch
at 8418", 4.5" xi"KBG-2 GLM w/ Dummy SBK-2 Latch at
6631", 4.5" x1" KBG-2 GLM w/ DCK-2 SV BEK Latch at 3410",
and a 4.5" X nipple at 2088".
RUNCMP RU and Displace 120 bbls of 120 degree sea water. Followed
with 125 bbls of 120 degree inhibited sea water. Pumped 3
BPM C~ 160 psi.
RUNCMP Held crew change and performed pre-tour checks of PVT
equipment and derrick. Dropped ball /rod. Pressured tubing
to 3500 psi to set packer and held ressure for 30 charted
minutes -tubing MIT. Bled tubing pressure to 1500 psi.
Pressured annulus to 3500 si and held for 30 charted minutes
- IA MIT. Bled tubing pressure and observed DCR valve shear.
Confirmed DCR shear by circulating both ways through valve
at 3 bpm and 1160 psi.
RUNCMP Installed TWC. Tested TWC from above to 3500 psi for 10
charted minutes and from below to 1000 psi for 10 charted
minutes.
RUNCMP econfigured ROPE. Removed pipe rams from double gate
cavities and replaced double gate with single gate. ND BOPE.
Set BOP stack back.
RUNCMP N/U adapter flange.
RUNCMP Crew change. Check PVT alarms. Inspect derrick. Service rig.
RUNCMP Finish N/U adapter flange. Preesure test hanger void to 5000
psi for 30 min. Ok.
RUNCMP N/U tree. check all studs. Fill tree & pressure test to 5000 psi
for 15 min. OK.
RUNCMP Spot in Hot oilers. R/U lines to tree. Pressure test lines to 3500
psi, Ok. Freeze protect IA w/ 150 bbls of diesel. Pumped 1.7
BPM C~ 600/900 psi.
RUNCMP U-Tube freeze protect between IA and tubing.
Printed: 9/30/2008 11:55:37 AM
Printed: 9/30/2008 11:55:37 AM
JEILHEQC3 = McEVOY
,CTUATOR =
___
:B. ELEV - 22.4'
F. ELEV = 39.17
:OP = 3000'
lax Angle = 96 @ 10812'
Tatum MD =_ 10246'
Datum TVD = 8800' SS
9-5/8" CSG, 47#, NSCC, ID = 8.681" 2000'
18-5/8" CSG, 96.5#, K55, ID = 17.689" 2004'
13-3/8" CSG, 72#, N-80, ID = 12.347" 2022'
N~°'li U ~ ='~ ',,,r:y ~
TOP OF 2-3f8" ~Ft
4-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" ~ 8605'
7" TBG, 26#, L-80, ID = 6.276" I 8642'
TOP OF 7" LNR $642'
SAFETY NOTES: COMMUNICATION IN 18-5/8" x 13-
F 04A 3/8' ULUS (FILLED WITH CRUDE).
1934' --113-3/8" BAASCH ROSS CSG PATCH
2000' 9-5/8" X 7" XO
2022' 13-3/8" X 9-5/8" XO
20 4-112" HES X NIP, ID = 3.813"
t;A ~ I_ It=T MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
3 3410 33$7 23 KGB-2 DOME BK 16 09124108
2 6631 5919 39 KGB-2 SO BK 20 09/24108
1 8418 7338 35 KGB-2 DMY BK 0 09112;08
$4$7" -~ 4-112" HES X NIP, ID = 3.813"
$50 7" X 4-1f2" BAKER S-3 PKR
8531' 4-112" HES X NIP, ID = 3.813"
8594' 4-112" XN NIP, ID = 3.725„
$$Q5" 4-112" WLEG
9-5/8" CSG, 47#, N-80, ID = 8.681" ~~ 9312'
2-3/8" LNR, 4.6#, L-80, .0039 bpf, ID = 1.995" -9700
PERFORATION SUMMARY
REF LOG: SWS MEM CNL ON 03/01/03
ANGLE AT TOP PERF: 90 @ 10540'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
1-1/2" 4 10540 - 10610 O 03/02/03
1-1/2" 4 10700-10850 O 03/02/03
1-1 /2" 4 10930 - 11020 O 03102/03
9762' -{ ESTIMATED TOP OF CEMENT
SCMT (08/18/06)
9876' 7" MARKERJT
MILLOUT WINDOW 10010 ' - 10016'
CEMENT RAMP 10010'
1
7" LNR, 29#, N-80, .0371 bpf, ID = 6.184" ~-~ 10665'
2-3/8" LNR, 4.6#, L-80, .0039 bpf, ID = 1.995"
I 11193' I
PBTC
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
06/26/76 ORIGINAL COMPLETION WELL: F-04A
05/26/87 LAST WORKOVER PERMff No: 2021000
03/03/03 DAC/KK CTD SIDETRACK (F-04A) API No: 50-029-20089-70
09/14/08 N4ES RWO SEC 2, T11 N, R13E, 2308' FSL & 2395.9' FWL
10/02/08 JLJ/TLH GLV C/O (09124/08)
BP Fxolnrafinn (Alaska/
Well Job# Loa DescriDtion Date BL Color CD
C-11A 11225983 LDL 07/02/06 1
B-25 11217247 LDL 05/11/06 1
F-06A 11258688 PROD PROFILE W/DEFT 03/20/06 1
G-18A 11209612 MEM INJECTION PROFILE 07/19/06 1
P-24 11216206 MEM INJECTION PROFILE 07/06/06 1
B-28 11221590 LDL 07/04/06 1
B-01 11211508 PROD LOG W/DEFT 06/23/06 1
W-39A 11216197 MEM PROD PROFILE OS/29/06 1
Z-02A 11212856 INJECTION PROFILE 05/02/06 1
G-03A 11211493 LDL OS/24/06 1
C-26A 11225979 LDL 06/07/06 1
F-26B N/A MEM PROD & INJECTION 06/06/06 1
F-26B N/A MEM BORAX LOG 06/06/06 1
W-39A 11216197 MEM BORAX LOG OS/29/06 1
F-04A 11221602 SCMT 08/18/06 1
Y-OBA 11221604 SCMT 08/20/06 1
C-06B 11212883 USIT 08/15/06 1
X-27 11217274 USIT 08/26/06 1
K-07D 10942217 MEMORY SCMT 06/15/05 1
Y-1OA 11209611 MEM INJECTION PROFILE 07/18/06 1
F-12 11225984 LDL 07/02/06 1
K-07D 11058256 SBHP SURVEY 11/28/05 1
X-04 10919925 PROD PROFILE W/DEFT 12/15/04 1
A-30A 11054295 CH EDIT OF PDC LOG W/GR 04/06/05 1
17-04B 40010183 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 03/09/04 1 1
Z-30A 40010092 OH EDIT OF MWD/LWD (REDO OF TVD DATA) 01/27/04 1 1
17-04B PB1 40010183 OH EDIT OF MWD/LWD 03/08/04 2 1
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503·2838
ATTN: Beth
f}();)-I ad
SCANNED SEP 14 2005
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
r::: - - _.~ -
r-< :~ ..." t.,r_~~~: ,;
.J
.::)1.:"(
08/28/06
.i. ;;. ~0uò
NO. 3941
~CR & Gas Cons. CQmrniWoo
Anchorage
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Company:
Field: Prudhoe Bay
.
.
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
.
.
':" 'r' ;"
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _lnserts\Microfilm_ Marker.doc
J!1p ~~-
DATA SUBMITTAL COMPLIANCE REPORT
4/1/2005
Permit to Drill 2021000
Well Name/No. PRUDHOE BAY UNIT F-04A
Operator BP EXPLORATION (ALASKA) INC
5fl~J.. Â.5 ~J,- 4'vI:JT
API No. 50-029-20089-01-00
MD 11206 ,/ TVD 9019 ~ Completion Date 3/3/2003 ~
Completion Status 1-01L
------~-
REQUIRED INFORMATION
Mud Log No
Samples No
---------
-------
DATA INFORMATION
Types Electric or Other Logs Run: CCL, GR, MWD, Memory CNL
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
r ED-:-:-C-u- [..-11 719 Neutron
J~~' Neutron
I
vtP1 Directional Survey
I pt Directional Survey
t~D Pdf Directional Survey
þiD D Directional Survey
0:~1 C Tf ~81 LIS Verification
~ LIS Verification
k6 C Pds 181 Gamma Ray
I~ Gamma Ray
vf:~ C ~301 Gamma Ray
C Lis 2301 Gamma Ray
~g------ Gamma Ray
Log Log Run
Scale Media No
1
25 Blu
25
25 Blu
25
25 Blu
Well Cores/Samples Information:
Name
Interval
Start Stop
Received
Sent
Current Status 1-01L
UIC N
Directional su:~y~
(data taken from Logs Portion of Master Well Data Maint)
Interval OHI --
Start Stop CH Received Comments
8415 11155 Open 5/13/2003
8415 11155 Open 5/13/2003
10783 11206 Open 5/15/2003
10010 11226 Open 5/15/2003 PB1
10783 11206 Open 5/15/2003
10010 11226 Open 5/15/2003 PB1
9904 11206 9/25/2003
9904 11206 9/25/2003
9897 11206 9/25/2003 Gamma Ray - MWD
9897 11206 9/25/2003 Gamma Ray - MWD 1'13 i 1
9897 11226 12/11/2003)P61
9897 11226 12/11/2003
9897 11226 12/11/2003 ¡lí)i rlJj) k_,-,"",:_
Sample
Set
Number Comments
Permit to Drill 2021000
MD 11206
TVD 9019
ADDITIONAL INFORMATION
Well Cored? ~
Chips Received? Y / N
Analysis
Received?
'-¥IN
---~
Comments:
-_._--~--
-----
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
4/1/2005
Well Name/No. PRUDHOE BAY UNIT F-04A
Operator BP EXPLORATION (ALASKA) INC
Completion Date 3/3/2003
Completion Status 1-01L
Current Status 1-01L
Daily History Received?
(j)N
(DN
Formation Tops
~
Date:
API No. 50-029-20089-01-00
UIC N
'-,
tj ¡¡, Mø r--
-
),
ÐoC9 "(CÕ
)
Transmittal Form
r&l.
BAKER
HUGHES
INTEQ
Anchorage GEOScience Center
To: AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska
99501
Attention: Lisa Weepie
Reference: F-04APB1
II Contains the following:
111 LDWG Compact Disc Jf9.30 \
, (Includes Graphic Image files)
1 LDWG lister summary
ii
Ii
II
P
t¡
L
il
! ~
i ~
n
¡¡
Ii
¡¡
H
II
1 blueline - OR/Directional Measured Depth Log
I blue line - OR/Directional TVD Log
"J)
H
\I
Ii.
¡
~ I
11
ii
i¡
li
il.
11
1\
Ii
"I
II
II
!I
,.,
II
I
[ LAC Job#: 435828
Sent By: Glen Horel
Received BY~\ ~ .~ \.<J ~..::::::~.:::}-.....~
Date:fitiœVE D
Date: OFC 11 ?003
Aiaska Oil & Ga$ Con&.. Çommis8i0n
Anchorage
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska
99518
Direct: (907) 267-6612
FAX: (907) 267-6623
""':-::-::; -.... < . ,.
t". ~-;\'~~í\ '- ~~'::>
rT":~~'::~~::'::::':'-"1
-ww-w----··i,¡,;,~;_'ì::~l;;.;·~;rw-'....----.-
.rill .',' "''f' I'N¡"
" ...
__ ~',." ~'~" ,1I'Ni,1'
..'1 '<"I~ M...
-..
.- ,..
lIr.'Il',\IIo'\J',"'''.'¡1
:_.... ....øI -" ...'1:; ""'1,'
_'11' .." __¡..~...".~'" ..." ,. "'';''' '..
____________w__,_____._,_
L~ ¡ - '¡t~·~"'_
~;7~.~::?~~~
.~ '.-". ,.---
..._--_.~_._..-~
~~:-~.,lM-
----..-"-.-
)
Transmittal Form
INTEQ
To: AOGCC
333 West ih Ave, Suite 100
Anchorage, Alaska
99501
Attention: Lisa Weepie
Reference: F-04A
I Contains the following:
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
')
ðÖ6-\00
r&l.
BAKER
HUGHES
Anchorage GEOScience Center
1 blueline - OR/Directional Measured Depth Log
1 blueline - GR/Directional TVD Log
LAC Job#: 435828
Sent By: Glen Horel
Received BY~-~ ~ '-<:;, ~~
Da~e·:" Ser'·'~·p;'· " f~f}'f:' .', ,- '~~
~"T.I:~,¡}' i¡:L.....\. . ~ I, .}f ",n['1~ ~ ,I
;~. ~J. I~~~l.~.,::-~ «~,,~~~' ~~!'fi~I'I, J.¡ \oJ; .._~ ~..JI
Date: r.rn t' I'" ,'I),A':'
,Jt¡-- L ~ L'·)\",.)
J,jU.s~¡;d ;.:: '.,,«~,;;. '..:·Cii1n1i$ion
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & ftErnRNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska
99518
Direct: (907) 267-6612
FAX: (907) 267-6623
r'r:::p~~-:~~,,, my¡ T ""' I
. ..-....... -;";~'·-·::·;¡'·;'l:!\~:.:i:'~';-j
r~ ~. ~''',~:' ., ~"
~;~-~~---,--~~_...~. _.~.',.,-;'~~_...~:~~
1llUll»:1I\ _III 'i&o\ "'~ _'nIILl(
: "'"...,-. .~.'"
,.......,....,... u...._,.....
.....',""" t
!___..__...jl£:~";,~;;__._.._____
~~~:~..'''.'' '~'r.r-· '" ~_~;:'=~f:ª
I 1i:J." 'I~ ."\I',~ ' ',:1'
i:a:,...·;;;~·.· ... ;'~ .:~?"!!.
; ....101..'.. .
----------
la,,,,,·.
.-~..-_.-..__.__..-._---
:-...--
- --'~-'-
\-,.-
L__.________.____..._.__
z
,,'''1
..;..-
Schlumbepger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
05/08/03
NO. 2772
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Color
Well Job # Log Description Date Blueline Prints
E-02A í £f '1 .... í .J,~ MEMORY PROD PROFILE 03/15/03 1
E-31A ..:l.-7-> -ii. MEMORY PROD PROFILE 08/08/02 1
M-29A 'fÆ:- PDC & TEMPERATURE 04/15/03 1
F-04A -' S:A:.-"'" 23097 MCNL 03/02/03 1
H-21 -7 I 23074 RST-SIGMA 01/30/03 1
'D.S.1-32A. o.~-IB_~ 23083 MCNUBORAX 02/02/03 1
-D.S. 5-0GA '~0f{ 23056 RST-SIGMA 01/23/03 1
D.S.7-29B I -~'. 23096 MCNL 02/15/03 1
D.S.15-38A I . ~O'; 23089 LINER TOP TIE-IN MGRlCCL 02/10/03 1
0.5. 15-48A f 1'5"""-' :Jr.5. 23098 MCNL 02119/03 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
t)iC:0CJ\ J~-=O' .
:1 ~.~ ~ ~. :¡ ii. '\.;¡F .
-~ ':\~... ~ LÜIMI!I J '~ ~~-
MA Y Î 3 200,3
,';·!sJka ;Ji¡ ,~ \3a5 Cons. (,~ff:m~~n
Anc.t¡~-3
CD
1
1
1
1
1
1
1
~.
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Receivd~(~
)
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
23081 NSL, 2396' EWL, SEC. 02, T11N, R13E, UM
At top of productive interval
2986' NSL, 1140' EWL, SEC. 01, T11N, R13E, UM
At total depth
3746' NSL, 1128' EWL, SEC. 01, T11 N, R13E, UM X = 655941, Y = 5975348
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field I Prudhoe Bay Pool
KBE = 57.1' ADL 028280
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
2/23/2003 2/2712003 3/3/2003
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
11206 9019 FT 11156 9017 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
CCL, GR, Memory CNL, MWD
23.
~. CASING
SIZE
Classification of Service Well
\!jl~'"
\-'~.~ ..
ì~:;:;. ,,,,,,,.., 9.
X = 651960, Y = 5973828
",{ ,~/~~~\~;,;':L)
" t:~j, .~!
:;~. ",...AJ,..t4.r.:l..,J"':"~......+
~1X~i'.~~'~~~'-':;~: ,
7. Permit Number
202-100
8. API Number
50- 029-20089-01
Unit or Lease Name
Prudhoe Bay Unit
X = 655969, Y = 5974589 10. Well Number
F-04A
15. Water depth, if offshore 16. No. of Completions
NIA MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 1901' MD 1900' (Approx.)
30"
18-5/8"
13-3/5· x 9-5/5"
9-5/8" X 7"
2-3/8"
WT. PER FT.
Stove
96.5#
68# 147#
47# 129#
4.6#
GRADE
Pipe
K-55
K-55 / N-80
N-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
Surface 96' 36"
Surface 2004' 24" 9200 sx Permafrost
Surface 9312' 12-1/4" 2410 sx Class 'G', 1775 sx PF II
Surface 10010' 12-1/4" x 5-1/2" 460 sx Class IG'
8483' 111931 3" 51 sx Class 'G'
CEMENTING RECORD
AMOUNT PUllED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
1-1/2" Gun Diameter, 4 spf
MD rvD
10540' - 1 0610' 9029' - 9029'
10700' - 108501 9029' - 9023'
10930' - 11020' 9016' - 9014'
MD
rvD
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2", 12.6#, L-80 19651
3-1/2", 9.3#, L-80 8583' 8542'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
20001 Freeze Protected with 18 Bbls MeOH
27.
Date First Production
March 21,2003
Date of Test Hours Tested
3/28/2003 4
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR Oll-BBl
TEST PERIOD 2,095
Oll-BBl
GAs-McF
1,351
GAs-McF
WATER-BBl
85
WATER-BBL
CHOKE SIZE GAS-Oil RATIO
90.55° 645
Oil GRAVITY-API (CORR)
27.1
Flow Tubing Casing Pressure CALCULATED
Press. 171 24-HoUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core ~-5~~1:~¡: ~þ_,,:; ~::: ~ \i
No core samples were taken.
PYR 0: 3 2'
l~ I ~ \' i, '.1 (ìJ!( \-I, r:,¡;(:
¡ .Jh~v. ",',. ,... ;;r <\:_I~.::.~J"::;
Form 10-407 Rev. 07-01-80
QBOMS 8Fl
ORIGINAL
I~~m
7
GrV
Submit In Duplicate
)
)
29. Geologic Markers 30. Formation Tests
Marker Name Measured True Vertical Include interval tested, pressure data, all fluids recovered and
Depth Depth gravity, GOR, and time of each phase.
Top CGL 10058' 8688'
Base CGL 10152' 8771'
25N 10207' 8821'
25P 10213' 8827'
22P 10290' 8898'
21N 103551 8956'
21P 10364' 8963'
Zone 1 B 10418' 9000'
14N 10426' 9003'
14P 10438' 90081
lJ..
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Tenie Hubble ..-( ~ ~ litle Technical Assistant Date ()li -D~. 0 ~
F-04A 202-100 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No. Drilling Engineer: Ted Stagg, 564-4694
INSTRUCTIONS
ITEM 1: Classification of SelVice Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply far injection, abselVatian.
injection for in-situ combustion.
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 5: indicate which elevation is used as reference (where not otherwise shown) far depth measurements given in ather spaces on this fann and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals far only the interval reported in item 27. Submn a separate fann lor each additional intelVal to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (Gl) or other elevation (OF, KB, etc.).
lõEM 28: If no cores taken, indicate 'none'.
ITEM 27: Method of Operation: Flowing, Gas lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Form 10-407 Rev. 07-01-80
o RIG I N .~ ! ..
)
)
BP EXPLORATION
QperationsSummaryReport
Page·1 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-04
F -04a
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 2/18/2003
Rig Release: 3/3/2003
Rig Number: N2
Spud Date: 2/1/1971
End: 3/3/2003
Date From - To Hours Task Code NPT Phase Description of Operations
2/18/2003 0.00 DECaMP
0.00 WEXIT
0.00 PROD1
23:15 - 23:30 0.25 MOB P PRE Hold PJSM 1 Rig Move operations meeting with rig crews,
Drilling Support and Security.
23:30 - 00:00 0.50 MOB P PRE Start mobilization to F-04a.
2/19/2003 00:00 - 13:30 13.50 MOB P PRE Continue rig move to F-04a. On location at 1330 hrs.
13:30 - 18:00 4.50 MOB P PRE Install 1.25" thick shim plates under front A-leg sections.
18:00 - 18:20 0.33 MOB P PRE Crew change. TL and PJSM review plan forward and discuss
SOP's for raising derrick.
18:20 - 22:00 3.67 MOB P PRE Raise derrick. Pick-up coil injector and stab e-line coil.
22:00 - 22: 1 0 0.17 MOB P PRE PJSM pulling over wellhead assembly.
22:10-23:00 0.83 MOB P PRE Position rig over well.
23:00 - 00:00 1.00 BOPSURP PRE Accept rig at 2300 hrs. Start NU of BOPE.
2/20/2003 00:00 - 01 :30 1.50 BOPSURP PRE Nipple up BOPE.
01 :30 - 06:00 4.50 BOPSURP PRE Test BOPE 250 psi low 3500 psi high for 5 min each. Choke
manifold. Annular 2500 psi high. AOGCC rep Chuck Shieve
waived witnessing test.
06:00 - 06:45 0.75 BOPSUR P PRE Crew change; SafetylTech limit meeting.
06:45 - 07:30 0.75 RIGU P PRE Take on 2 ppb biozan water. lAP = 0; OAP = 0
07:30 - 10:15 2.75 RIGU P WEXIT PU inj. Install CTC to bury end of cable. Stab on well. PT
inner reel valve. Reverse thru kill line for slack management
and to displace methanol. Pumped up to 2.8 BPM; 4000 psi.
Did not hear any rattling. Blow back end of coil with rig air.
Unstab. Cut back coil -- cut 25' before finding cable. RD
cutter.
10:15-12:15 2.00 STWHIP P WEXIT Install E-line CTC.
12:15 -14:00 1.75 STWHIP N SFAL WEXIT Troubleshoot high resistance in coil E-line -- could not find
cause. Check well -- dead.
14:00 -15:30 1.50 STWHIP P WEXIT MU pilot milling BHA (D331 on 1.75 deg Weatherford motor).
15:30 - 17:30 2.00 STWHIP P WEXIT RIH. RIH thru tailpipe area -- smooth. RIH and tag cement top
at 9936' uncorrected.
17:30 - 18:15 0.75 STWHIP P WEXIT Log tie-in. Correct depth (-38'). TOC 9898' md
18:15 - 23:25 5.17 STWHIP P WEXIT Mill highside pilot hole. Good cement starting at 9900'. Rate
1.68 bpm inlout. Free-spin 3200, 200-300 motor work. 2-3k
wob, 12'-18'/hr initial increasing to 25-30'/hr at 9920'. 30-40'/hr
9960 to 10002'. Flop TF over to 180 and drill to 10009'. Good
pressure 1 reactive torque indication seen at 10009'.
23:25 - 00:00 0.58 STWHIP P WEXIT TOH stop and flag EO BHA at 9897'. Try to open EDC circ port
but no indication from surface readout equipment that it
opened. Attempt to open again then lost all comms with
downhole equipment.
2/21/2003 00:00 - 01 :15 1.25 STWHIP P WEXIT Continue TOH. Set back injector.
01:15 - 01:30 0.25 STWHIP P WEXIT UD BHA #1. Discover that the EDC had disconnected leaving
the following fish in the hole. Mill and motor, BH Inteq orientor,
pressure sensor, gamma ray package, lower portion of
disconnect. Total length 43.33'
01 :30 - 03:30 2.00 FISH N DFAL WEXIT Call Baker TT and town engineer to dicuss options. Fish may
be setting on top of cement plug in the 7" csg (35 deg hole
angle) or may have fallen back down the just drilled 2.74"
pilothole. Decided that Slickline would offer the best options at
this time.
03:30 - 06:00 2.50 FISH N DFAL WEXIT Rig up slickline unit: 0.125 wire; 80% strength = 2400 lb. MU
Printed: 4/2/2003 11 :30:41 AM
)
)
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-04
F-04a
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 2/18/2003
Rig Release: 3/3/2003
Rig Number: N2
Spud Date: 2/1/1971
End: 3/3/2003
Date From - To Hours Task Code NPT Phase Description of Operations
2/21/2003 03:30 - 06:00 2.50 FISH N DFAL WEXIT tools: 2-1/2" GR (shear up to release), SJ, KJ, OJ, 8' stem, RS.
06:00 - 08:00 2.00 FISH N DFAL WEXIT RIH. Clean thru tailpipe. Wt check: 600 Ib up. Tag fish 9880'
SLM (depth suggests fish is on top of cement plug). Latch fish
first try. Jar up 4 times at 1400lb and sheared off. Looks like
fish may have moved 8', POOH. Slight wt bobble thru tailpipe
8595'.
08:00 - 08: 15 0.25 FISH N DFAL WEXIT Swap GR with GS (shear down to release).
08:15 -11 :00 2.75 FISH N DFAL WEXIT RIH. Latch fish 9877' up. Start jarring up to 1500 Ibs. Lost
use of oil jars, but spangs got it free. POOH. Clean through
tubing tail.
11 :00 - 11 :30 0.50 FISH N DFAL WEXIT LD fish -- recovered. RD slickline.
11:30-12:30 1.00 STWHIP P WEXIT MU milling BHA #2: 2.5 deg fixed motor (output shaft turned to
2-1/8"; 1-step DSM). Cycle circ sub open/close to 20%.
Looks OK.
12:30 - 14:30 2.00 STWHIP P WEXIT RIH. Tight and stacking getting BHA started into the hole
(4-1/2" tubing at surface). Required pumping (bit spinning) at
0.3 BPM to get it moving downhole. SD pumps when we got
enough weight to push BHA down. RIH. Sat down at 8558'
CTM. Roll pumps to get through. RIH. Correct depth at flag
(-41').
14:30 - 14:45 0.25 STWHIP P WEXIT Log tie-in at 9818' GR spike. Correct depth (-1 '). 9862' E =
9982' M (mechanical was not zeroed at surface).
14:45 - 15:30 0.75 STWHIP P WEXIT RIH with highside TF. Tag cement top 9904'. Roll pump. Got
thru. RIH. Tag dry 10012'. PUH. RIH slow at 1.7; 3600 psi.
MW at 10,010.3' (but significant stack approaching this depth).
Flag pipe here. Stall here. PU l' per program, still in a stall.
PUH. RIH. MWat 10,010.1'. PUH to 10009.3'.
15:30 - 00:00 8.50 STWHIP P WEXIT Time mill window per table in program from 10009.3' to 10013'.
2/22/2003 00:00 - 01 :30 1.50 STWHIP P WEXIT Continue milling window per schedule. 10013' to 10017'
01 :30 - 02:30 1.00 STWHIP P WEXIT Drilling formation from 10017' - 10018'. Pick back up through
window. Had some trouble reaming back thru with serveral
stalls.
02:30 - 03:00 0.50 STWHIP P WEXIT Continue drilling ahead 1.65 bpm in/out 2.5-3k wob, 15-20'/hr.
Drill to 10023'.
03:00 - 03:45 0.75 STWHIP P WEXIT Continue working window area while CBU. Window = 10010' -
10016'.
03:45 - 05:45 2.00 STWHIP P WEXIT TOH for Crayola mill. Flag EOP at 9897'.
05:45 - 06:00 0.25 STWHIP P WEXIT LD one-step mill. Mill had significant wear on leading edge
where brass was brazed on. Diamonds missing from matrix.
Items for discussion: are we causing any damage to these
mills with brazing process?
06:00 - 06:30 0.50 STWHIP P WEXIT BHA 2.73" Crayola mill on 1.75 deg motor.
06:30 - 08:30 2.00 STWHIP P WEXIT RIH. lAP = 300 psi; OAP = 500 psi.
08:30 - 08:45 0.25 STWHIP P WEXIT Correct depth at flag (-43'). Log tie-in. Correct (+1').
08:45 - 09:30 0.75 STWHIP N DPRB WEXIT RIH. Tag TOC at 9901', fell thru. RIH at 180 TF. Tag dry
10011'. Repeat. Repeat. Can't get past top of window. Roll
pump at min rate. No go. Try full rate. No go, stall at
10011.4'. Try dry at 160L and 160R. No go.
09:30 - 10:30 1.00 STWHIP P WEXIT PUH above cement, open circ swap, and swap well to Flo-Pro
at 2.0 BPM (max rate that BHI will let us pump thru circ sub;
same rate we could get thru the motor. Other than bit
protection for high bend motors, not sure there's any advantage
of opening the circ sub).
Printed: 4/2/2003 11 :30:41 AM
)
)
Page 3 of 7
QperatlonsSummary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-04
F -04a
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 2/18/2003
Rig Release: 3/3/2003
Rig Number: N2
Spud Date: 2/1/1971
End: 3/3/2003
Date From - To Hours· Task Code NPT Phase Description of Operations
2/22/2003 10:30 - 10:45 0.25 STWHIP N DPRB WEXIT Reconfirm tie-in. No correction.
10:45 - 11 :00 0.25 STWHIP N DPRB WEXIT RIH and tag dry 10011'. Set down a little weight, orientto try
and skip thru. No go. PUH. RIH at minimum rate. Stall
10011.2'.
11:00-13:00 2.00 STWHIP N DPRB WEXIT POOH for different mill.
13:00 - 13:30 0.50 STWHIP N DPRB WEXIT MU 2.72" used crayola mill with bald nose (no cut-rite on nose).
Also, mill has no metal munchers.
13:30 - 15:45 2.25 STWHIP N DPRB WEXIT RIH. Correct depth at flag (-38').
15:45 - 15:50 0.08 STWHIP N DPRB WEXIT Log tie-in. Correct depth (-1').
15:50 - 16:00 0.17 STWHIP N DPRB WEXIT RIH dry with 180 TF. Tag 10012'. Repeat. Roll pumps and
tag 10011.7'. Will need to mill down.
16:00 - 19:00 3.00 STWHIP P WEXIT Mill down. Stall 10012.5'. PU; work back down. Moderate
motor work (100 psi) from 10014'-10016'. Heavier motor work
starting 10016'. Stall 10018'. PU; work back down. Make
another pass down without problem. Ream back up to 10009'.
Make 2 dry passes in/out without problems.
19:00 - 21 :20 2.33 STWHIP P WEXIT TOH for build assembly. Flagged EOP at 9800'.
21 :20 - 21 :55 0.58 DRILL P PROD1 LID BHA #4 and P/U BHA #5
21 :55 - 00:00 2.08 DRILL P PROD1 TIH to flag correct -40'.
2/23/2003 00:00 - 00: 1 0 0.17 DRILL P PROD1 Position GR at 9810' and log down. No correction.
00:10 - 05:00 4.83 DRILL P PROD1 Directionally drill build section from 10023' to 10082'. 1.8 bpm
in/out, 3500 psi off-btm 200-400 psi motor work. 2-3k wob
05:00 - 05: 15 0.25 DRILL P PROD1 Pull above window. Stop for flow check. Very slight increase in
volume last 4 hrs. Appears to be air in mud. Putting in 10 gal
Defoamer.
05:15 - 06:30 1.25 DRILL P PROD1 Drill to 10095'. ROP about 10 FPH.
06:30 - 09:00 2.50 DRILL P PROD1 Drill to 10110'. ROP is dropping. Ratty drilling with 500 psi -
700 psi stalls ("feels" weak for the extreme motor).
09:00 - 12:30 3.50 DRILL P PROD1 Drill to 10120', staying ratty with a bunch of stalls. Hoping to
see good azimuth before tripping, but wasting too much time
with this low ROP.
12:30 - 14:00 1.50 DRILL P PROD1 POOH.
14:00 - 14:30 0.50 DRILL P PROD1 LD DSX100 (T-rex cutters). 8-3. Nose RO, no cutting structure
left -- typical 23 wear. PU RR DS100 (cutters not T-rex).
14:30 - 14:55 0.42 DRILL P PROD1 RIH. Correct depth at flag (-45').
14:55 - 16:00 1.08 DRILL P PROD1 Log tie-in. Correct depth (+4'). Note: Only 3-1/2 hours to trip
out, change bit, trip in, and tie-in -- congrats to the crew.
16:00 - 16:30 0.50 DRILL P PROD1 RIH.
16:30 - 00:00 7.50 DRILL P PROD1 Directionally drill f/ 10120' to 10258'. 1.85 bpm in/out 3450 FS
3-500 psi MW Started drilling good then dropped off to ratty
drilling. Avg 18'hr.
2/24/2003 00:00 - 01 :00 1.00 DRILL P PROD1 Directionally drill f/ 10258' to 10270'.
01 :00 - 01: 15 0.25 DRILL P PROD1 Wiper to just below window.
01 :15 - 02:30 1.25 DRILL P PROD1 Directionally drill f/ 10270' to 10291'. Continual erratic drilling.
Suspect some bit damage from 23. Also, 22 has been very
conglomeritic.
02:30 - 03:45 1.25 DRILL P PROD1 POOH to check bit. Also, need to crank down motor to 2.1.
Flag pipe at 9800' EOP. Slow for TT - nothing seen.
03:45 - 04:45 1.00 DRILL P PROD1 Set back injector. LID BHA #6. Change out motor for 2.1 deg,
directional/gamma package. Bit wear pattern similar to first BC
bit.
04:45 - 06:20 1.58 DRILL P PROD1 RIH with BHA #7. Correct depth at flag (-44').
06:20 - 06:30 0.17 DRILL P PROD1 Log tie-in. No correction.
Printed: 4/2/2003 11 :30:41 AM
)
')
BP EXPLORATION
Operations Summary Report
Page 4 of 7
Legal Well Name: F-04
Common Well Name: F -04a Spud Date: 2/1/1971
Event Name: REENTER+COMPLETE Start: 2/18/2003 End: 3/3/2003
Contractor Name: NORDIC CALISTA Rig Release: 3/3/2003
Rig Name: NORDIC 2 Rig Number: N2
From - To Hours Task Code NPT Phase Description of Operations
2/24/2003 06:30 - 06:45 0.25 DRILL P PROD1 RIH. lAP = 600 psi; OAP = 650 psi.
06:45 -10:15 3.50 DRILL P PROD1 Drill about 25 - 30 FPH to 10369'. This 2.1 deg motor is only
giving DL's of about 27 deg/100, which will cause us to land 15'
-18' deep; need about 32 deg/1 00 to land on target.
10:15 - 10:30 0.25 DRILL P PROD1 Ream tight area 10250'.
10:30 - 12:00 1.50 DRILL P PROD1 POOH.
12:00 - 12:30 0.50 DRILL P PROD1 Dial motor to 2.8 deg. Bit OK to rerun, just one chipped cutter
on nose.
12:30 - 14:10 1.67 DRILL P PROD1 RIH with BHA #8. Correct depth at flag (-41').
14:10 - 14:15 0.08 DRILL P PROD1 Log tie-in. No correction.
14:15 - 14:30 0.25 DRILL P PROD1 RIH to TD.
14:30 - 20:05 5.58 DRILL P PROD1 Drill f/ 10369' to 10518'. ROP picked up to 60 FPH starting
about 10394'. Hit tough spot starting about 10450' (could be
14N shale?).
20:05 - 20:35 0.50 DRILL P PROD1 Wiper trip to 10030'
20:35 - 21 :50 1.25 DRILL P PROD1 Drill f/ 10518' to 10550'md 8974' tvd 1.82 bpm in/out 3k wob
21 :50 - 23:40 1.83 DRILL P PROD1 TOH for lateral BHA open EDC. Slow for TT - no problem.
130'/min 1.9 in / 1.46 out
23:40 - 00:00 0.33 DRILL P PROD1 Dial down AKO motor to 1.1 deg bend. Bit looked fine.
2/25/2003 00:00 - 00:10 0.17 DRILL P PROD1 Stab on injector.
00:10-01:55 1.75 DRILL P PROD1 RIH to flag @ 100'/min . Correct -40'. RIH to 9830' bit depth.
01 :55 - 02:00 0.08 DRILL P PROD1 Log tie-in -2' correction.
02:00 - 02:15 0.25 DRILL P PROD1 RIH to bottom. No problems with 1.1 motor
02: 15 - 04:25 2.17 DRILL P PROD1 Directionally drill ahead f/ 10550' to 10689' 1.84 in/out 3480
free-spin 3-400 psi motor work 2-3k wob 50-60'/hr. Start mud
swap. Landed out at 10552'md Start stacking weight.
04:25 - 05:05 0.67 DRILL P PROD1 Wiper trip window.
05:05 - 07:00 1.92 DRILL P PROD1 Drill to 10865'; 8970' SSTVD. Still trying to nose it down to
revised landing point of 8975'. Unusually small DL's with this
1.1 motor -- only averaging 5's.
07:00 - 07:45 0.75 DRILL P PROD1 Wiper to window 1.8/3250
07:45 - 08:20 0.58 DRILL P PROD1 Drill to 10882'. Need a higher bend motor to get to our target
TVD quicker.
08:20 - 10:00 1.67 DRILL P PROD1 POOH for higher angle motor.
10:00 - 10:45 0.75 DRILL P PROD1 At surface. Check bit (ok). Increase motor angle to 1.5 deg.
Get back on well.
10:45 - 12:30 1.75 DRILL P PROD1 RIH with BHA #10
12:30 - 12:45 0.25 DRILL P PROD1 Correct to EOP flag (-41.4') Log gr tie in. Subtract l'
correction.
12:45 - 13:00 0.25 DRILL P PROD1 Continue in hole. Window smooth. Tag TD at 10883'.
13:00 - 16:45 3.75 DRILL P PROD1 Drill ahead. 3450 psi @ 1.8 bpm. 300 psi DP. 1: 1 rtns. 2.5K#
WOB. ROP:20-30 fph. Drill to 10987'. Still in high gr shale.
16:45 - 17:45 1.00 DRILL P PROD1 Wiper trip to window. Discuss steering/directional options with
town. Hole smooth.
17:45 - 22:45 5.00 DRILL P PROD1 Drill ahead at 88R TF f/ 10990'. Order extra Klagard after
drilling high gr shale bring up to +/- 8ppb. Very slow ROP in this
shale <1 O'/hr. Try different TF, slow pump rate, low wob
nothing makes a difference. At 11005' decide to dive down in
structure. TF now at 135R. ROP picked up 20'/hr at 11015' -
11064' still drilling shale.
22:45 - 23:25 0.67 DRILL P PROD1 Wiper trip to window.
23:25 - 00:00 0.58 DRILL P PROD1 Drill ahead. ROP increasing at 11 080'md 8990'sstvd. 2-3k wob
rop > 70-80'/hr. Drill to 11095'. (shale)
Printed: 4/2/2003 1130:41 AM
)
)
Operations Summary Report
Legal Well Name: F-04
Common Well Name: F-04a
Event Name: REENTER+COMPLETE
Contractor Name: NORDIC CALISTA
Rig Name: NORDIC 2
From - To Hours Task Code NPT
2/26/2003 00:00 - 02:20 2.33 DRILL P
02:20 - 02:55 0.58 DRILL P
02:55 - 03:25 0.50 DRILL P
03:25 - 06:00 2.58 DRILL C
06:00 - 07:30 1.50 DRILL C
07:30 - 07:45 0.25 STKOH C
07:45 - 08:30 0.75 STKOH C
08:30 - 10:00 1.50 STKOH C
10:00 - 10:30 0.50 STKOH C
10:30 - 12:30 2.00 STKOH C
12:30 - 13:45 1.25 STKOH C
13:45 - 15:30 1.75 STKOH C
15:30 - 16:00 0.50 STKOH C
16:00 - 16:30 0.50 STKOH C
16:30 - 19:25 2.92 STKOH C
19:25 - 21 :20 1.92 STKOH C
21 :20 - 21 :45 0.42 STKOH C
21 :45 - 21 :55 0.17 DRILL C
21 :55 - 00:00 2.08 BOPSURC
2/27/2003 00:00 - 02:30 2.50 BOPSUR C
02:30 - 02:35 0.08 DRILL C
02:35 - 03:00 0.42 DRILL C
03:00 - 04:45 1.75 DRILL C
04:45 - 05:00 0.25 DRILL C
05:00 - 05:20 0.33 DRILL C
05:20 - 09:00 3.67 DRILL C
09:00 - 09:15 0.25 DRILL C
09:15 -10:30 1.25 DRILL C
10:30 - 11 :30 1.00 DRILL C
11 :30 - 15:30 4.00 DRILL C
15:30 - 16:30
16:30 - 21 :00
1.00 DRILL C
4.50 DRILL C
Phase
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Start: 2/18/2003
Rig Release: 3/3/2003
Rig Number: N2
Spud Date: 2/1/1971
End: 3/3/2003
Description of Operations
Drill f/ 11095' to 11226'. Increasing rop dropping back into
double digit API #'s. Inc 86+ 1.8 in/out 2-3k wob 100'+/hr
Wiper trip to window.
PUH to 9800'. Start to log then cancel. Town has decided to
come uphole to +/- 10800' and sidetrack.
TOH. Review options: open hole sidetrack or run Weatherford
open hole whipstock. Moblilize Weatherford.
Hold PJSM discuss I/d BHA and sidetrack plans.
Standby for Weatherford aluminum billet equipment.
Hold PJSM before MU BHA assembly.
Check e-line. MU tools.
RIH with EDC open Correct to flag (-39'). Continue into open
hole circulating at 0.3 bpm. Verify tie in with GR log. Ran
smooth through entire OH, even at 50 deg d-Iegs.
Close EDC. Pressure up setting to 4000 psi. PU and shear off
same. Top of WS set at 10783'.
POOH with setting tool.
Get off well. LD setting tool. MU kick off BHA (M-09 with 1.7
deg mtr). Get on well.
RIH.
Log gr tie in from 9830'. Subtract 6' correction.
RIH. Tag billet/whipstock at 10783'.
Begin time milling at 1'/hr. 3350 psi@1.76 bpm. No mtr work
or WOB. Drill off and continue drilling with high right TF to
1 0820'.
TOH BOP test due today. Notified AOGCC of test. Witnessing
wavied by rep. John Crisp.
Set back injector. LID BHA #11
PJSM for testing BOPE.
Pressure test upper & lower pipe/slip rams, blinds, inner/outer
stack & HCR valves. 250psi low, 3500psi high.
Continue testing BOPE, check bottle pre-charge pressures and
drawdown test on accumulator, test SLB inner reel valve.
PJSM picking up BHA #12
P/U BHA and stab on injector
TIH. EDC open
Log tie-in +4'.
RIH to 10820'.
Directionally drill f/ 10820' 1.8 in/out 2-3k wob 3400FS 3-400
psi motor work. Drill to 10917'.
Short wiper trip.
Drilling ahead. 3800 psi@ 1.8 bpm. 3550 psi fs. 1:1 rtns.
WOB: 2.5K# ROP: 30-70 fph. Drill to 10970'.
Wiper trip to window. Hole smooth.
Drilling ahead. Drill to 11060'. Weight transfer becoming a
problem. Pump 40 bbl pill of new mud. Some improvement.
Able to drill. In high gr shale. Add 4 drums lubtex (1 %). Drill
to 11085'.
Wiper trip to window. Hole very smooth.
Drill ahead. Able to get 2K# WOB with 5K# stacked on coil.
ROP <1 O'/hr f/11140'. Make several small wiper trips. Drilling
in shale. FS 3550 psi. 200 psi motor work. Confer with town
Printed: 4/2/2003 11: 30:41 AM
)
)
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-04
F -04a
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 2/18/2003
Rig Release: 3/3/2003
Rig Number: N2
Spud Date: 2/1/1971
End: 3/3/2003
Date From - To Hours Task Code NPT Phase Description of Operations
2/27/2003 16:30 - 21 :00 4.50 DRILL C PROD1 about slow shale drilling. Decide to end drilling at 11210'.
21 :00 - 21 :50 0.83 DRILL P PROD1 Wiper trip up to window. OOH to 9820'.
21 :50 - 22:05 0.25 DRILL P PROD1 Log tie-in. -1' correction.
22:05 - 22:45 0.67 DRILL P PROD1 Wiper to bottom. Tagged at 11206' TD motor work seen at
10105', 10155', 10280', 10518', 10920', 10982', 11139'
22:45 - 00:00 1.25 DRILL P PROD1 Wiper back to window then down. Looks good.
2/28/2003 00:00 - 00:45 0.75 DRILL P PROD1 TOH lay-in 120K LSRV Flo-Pro from TD to window.
00:45 - 02:25 1.67 DRILL P PROD1 TOH flag coil EOP at 8400'. Open EDC
02:25 - 03:25 1.00 DRILL P PROD1 Stab off well. R/U and freeze protect e-line coil. Same time LID
BHA #12.
03:25 - 03:35 0.17 DRILL PROD1 PJSM review unstabbing procedures.
03:25 - 04: 15 0.83 DRILL P PROD1 Prep e-line coil at drill floor to unstab and secure to reel.
04: 15 - 06:00 1.75 DRILL P PROD1 Unstab, spool back and secure reel.
06:00 - 06:45 0.75 DRILL P PROD1 Hold extensive PJSM to discuss sim ops of running liner and
changing reels.
06:45 - 13:30 6.75 CASE P CaMP RU to run 86 jts 2-3/8", 4.6#, L-80 STL liner. Drift each
connection with 1.89" drift. Begin reel swap from e-line to
plain coil (2"). Completed reel swap by 1 0:00 am.
13:30 - 14:30 1.00 CASE P CaMP MU liner running tool assembly. Set in 2-3/8" slips wI TIW
valve.
14:30 - 15:00 0.50 CASE P CaMP Hold extensive PJSM for coil stabbing procedure.
15:00 - 16:00 1.00 CASE P CaMP Stab coil into injector using tugger system.
16:00 - 17:00 1.00 CASE P CaMP Displace meoh from coil.
17:00 - 18:50 1.83 CASE P CaMP Weld on 2" SLB connector (verify id: 1.09"). Pull test 25k PT to
4k. Load and pump dart 40.1 bbls
18:50 - 19:00 0.17 CASE P CaMP PJSM stabbing on well.
19:00 - 21 :20 2.33 CASE P CaMP Stab on liner. Fill liner w/5 bbls RIH min rate 1 OO'/min to 9800'.
Check wts. up 27k. Correct -41' depth. RIH tagged and work
through at 10920'. Tagged again at 11040' little harder working
through this one.
21 :20 - 21 :50 0.50 CASE P CaMP Working pipe to bottom.
21 :50 - 22:35 0.75 CASE P CaMP Load and pump .625" steel ball pump 30.8 bbls ball on seat.
Sheared at 4211 psi. Pick-up 19k confirm release. Set down
10k.
22:35 - 00:00 1.42 CASE P CaMP Swap well to 2% KCL. Flo-Pro going to Nordic #1.
3/1/2003 00:00 - 00: 15 0.25 CEMT P CaMP PJSM discuss cementing procedures and job assignments.
00: 15 - 02:00 1.75 CEMT P CaMP Batch mix cement. Pump 5 bbls water ahead PT lines to 4k.
Pump 10 bbls of 15.8ppg cement. Shutdown flush lines back to
vac-truck. Load CT wiper dart. Pump dart away and verify.
Displace with 30 bbl Bio remainder KCL. Full returns. Darts
landed on time and held. CIP @ 01 :55 hrs.
02:00 - 03:35 1.58 CLEAN P CaMP Pressure up to 500 psi on liner and sting out. Lay-in 20 bbl bio
1 :1. TOH no cement to surface seen. (not expected)
03:35 - 04:00 0.42 CLEAN P COMP Close Master valve. Setback injector. LID CTLRT.
04:00 - 04: 1 0 0.17 CLEAN P COMP PJSM picking up 1" hydril BHA
04:10 - 08:00 3.83 CLEAN P COMP P/U cleanout motor and 94 jts. 1" CS hydril.
08:00 - 08:30 0.50 CLEAN P COMP MU rest of BHA. Stab on well.
08:30 - 11 :45 3.25 CLEAN P COMP RIH wI 1-11/16" motor & 1.8 speed mill. Ran to 11153' and
tagged up. Mill for 15 minutes no drill off. No apparent cement
fill.
11 :45 - 13:00 1.25 CLEAN P CaMP POOH with clean out assembly. Hold PJSM before getting to
surface.
13:00-14:30 1.50 CLEAN P COMP Stand back CHS in derrick.
Printed: 4/2/2003 11 :30:41 AM
)
)
BP
Operati.ons Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
F-04
F-04a
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start: 2/18/2003
Rig Release: 3/3/2003
Rig Number: N2
Spud Date: 2/1/1971
End: 3/3/2003
Date From - To Hours Task Code NPT Phase Description of Operations
3/1/2003 14:30 -15:00 0.50 CLEAN P COMP LD mill & motor.
15:00 -15:15 0.25 EVAL P COMP Hold PJSM before MU logging tools & BHA.
15:15 - 15:45 0.50 EVAL P COMP MU CNLlCCLlGR tools.
15:45 - 18:55 3.17 EVAL P COMP RIH with 47 stands CSH out of derrick.
18:55 - 20:00 1.08 EVAL P COMP TIH w/ logging tools.
20:00 - 22:20 2.33 EVAL P COMP Start logging down f/ 8450' at 60'/min. Tagged at 11194'. Log
up and lay-in clean Flo-Pro perf pill.
22:20 - 23:00 0.67 EVAL P COMP TOH to 1" CSH hydril pipe
23:00 - 00:00 1.00 EVAL P COMP Stand back CHS in derrick.
3/2/2003 00:00 - 01 :40 1.67 EVAL P COMP Continue stand back hydril pipe in derrick.
01:40 - 02:15 0.58 EVAL P COMP LID CNL tools.
02:15 - 04:15 2.00 EVAL P COMP Process log and fax to town. WO perf orders.
Found top of liner at 8483'md. PBTD is 11157'.
Same time PT liner lap to 2000 psi for 30 min. 30 psi leak-off.
Test good.
04:15 - 06:00 1.75 PERF P COMP Call out and load guns in pipe shed.
06:00 - 06: 15 0.25 PERF P COMP Hold PJSM before MU perf guns.
06: 15 - 07:30 1.25 PERF P COMP MU 493' 1-11/16" HSD PJ1606 4 spf guns (23 guns).
07:30 - 09:30 2.00 PERF P COMP Run guns on 74 jts of 1" CSH. Check each connection while
rng stands. None found loose. Make up to coil. Stab on well.
09:30 - 11 :30 2.00 PERF P COMP RIH with perf guns. Tag PBTD and correct to CNLlGR logged
depth of 11157'. PU to btm shot depth of 11020'.
11:30-12:30 1.00 PERF P COMP Pump 5 bbls flo pro and drop 0.5" steel ball. Circulate to firing
head. Surge pump to get ball on seat. On seat at 43 bbls.
Start moving guns slowly up hole. Guns fired at 3000 psi. Perf
intervals: 10540-10610, 10700-10850, 10930-11020. with
1.56" HSD PJ 1606,4 spf guns.
12:30 - 15:15 2.75 PERF P COMP POOH filling from top. Pull 40 fpm in liner to reduce chance of
swabbing.
15:15 - 16:45 1.50 PERF P COMP Get off well. Stand back CSH.
16:45 - 18:30 1.75 PERF P COMP LD perf guns. All shots fired.
18:30 - 19:45 1.25 DEMOB P COMP P/U nozzle RIH to 2000' and FP well with 18 bbls methanol.
19:45 - 21 :45 2.00 DEMOB P COMP FP 2" coil. Prep to unstab coil from injector. Clean mud tanks.
21:45 - 22:00 0.25 DEMOB P COMP PJSM review procedures for unstabbing and respooling coil.
22:00 - 00:00 2.00 DEMOB P COMP Unstab and secure 2" coil to reel.
3/3/2003 00:00 - 01 :00 1.00 DEMOB P COMP Secure coil to reel and prep to drop out of reel house.
01 :00 - 03:00 2.00 RIGD P POST Nipple down BOPE. Install tree cap and test to 4k.
Lower reel to truck. Will move w/o reel to Kuparuk
Rig Released at 0300 hrs 3-03-2003
Printed: 4/2/2003 11 :30:41 AM
,.',.
~ta
)
)
B.P. EXPLORATION ~O~·-'/OO
F PAD, WELL NO. F-04A
PRUDHOE BAY FIELD, ALASKA
Gyro Multishot Inside 4.5/3.5/2.675" Csg.
Survey date: 4/2/02
Job number :AK0402GCE510
5. EQUIPMENT AND CHRONOLOGICAL REPORT
4. QUALITY CONTROL
3. OUTRUN SURVEY LISTING
2. SURVEY DETAILS
1. DISCUSSION, SURVEY CERTIFICATION SHEET
CONTENTS
JOB NUMBER :AK0402GCE510
')
)
~ta
gyrofdata
:')
1. DISCUSSION. SURVEY CERTIFICATION SHEET
~ta
'.)
)
DISCUSSION
JOB NUMBER: AK0402GCE510
Tool 811 was run in F-04 on Wireline. The survey was run without any problems.
gyrq'data
)
')
SURVEY CERTIFICATION SHEET
JOB NUMBER: AK0402GCE510
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the
wellsite.
Checked by :-
WALTER KILEY
OPERATIONS MANAGER
~data
)
)
2. SURVEY DETAILS
gyrofdata
CLIENT:
RIG:
LOCATION :
WELL:
LATITUDE:
LONGITUDE:
SURVEY DATE:
SURVEY TYPE :
API NUMBER:
DEPTH REFERENCE:
MAX. SURVEY DEPTH:
SURVEY INTERVAL:
CALCULATION METHOD:
SURVEYOR:
')
)
SURVEY DETAILS
JOB NUMBER: AK0402GCE510
B.P. EXPLORATION
FPAD
PRUDHOE BAY, AK
F-04
70.3360 N
148.9000 E
4-2-02
CONTINUOUS
50-029-2008900
ROTARY TABLE ELEVATION
10300.0
OVERLAP 0.0
MINIMUM CURVATURE
TOM STODDARD
gyrodata
)
3. OUTRUN SURVEY
A Gyrodata Directional Survey
for
B.P.
Location: F PAD, PRUDHOE BAY, AK
'-/
Well: F-04, 4.5"/3.5"/2.875"
Job Number: AK0402GCE510
Run Date: 4/2/02 9:20: 11 AM
Surveyor: Tom Stoddard
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.336000 deg. N Survey Longitude: 148.900000 deg. E
Sub-sea Correction from Vertical Reference:
57.07 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
'~-
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Well Head Location
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BA Y, AK
Job Number: AK0402GCE510
MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet feet feet deg. feet
100 ft.
0.0 0.00 0.00 0.00 0.0 -57.1 0.0 0.0 0.0 0.00 N 0.00 E
100.0 0.66 190.40 0.66 100.0 42.9 -0.6 0.6 190.4 0.56 S 0.10W
200.0 0.87 180.54 0.25 200.0 142.9 -1.9 1.9 186.5 1.89 S 0.21 W -'
300.0 1.38 176.73 0.51 300.0 242.9 -3.9 3.9 182.3 3.85 S 0.15W
400.0 1.83 172.82 0.47 399.9 342.9 -6.6 6.6 179.0 6.64 S 0.12 E
500.0 2.40 168.44 0.59 499.9 442.8 -10.3 10.3 175.9 10.27 S 0.73 E
600.0 2.60 166.57 0.22 599.8 542.7 -14.5 14.6 173.4 14.53 S 1.68 E
700.0 2.42 164.93 0.19 699.7 642.6 -18.8 19.0 171.6 18.78 S 2.76 E
800.0 1.75 163.31 0.67 799.6 742.5 -22.3 22.6 170.5 22.28 S 3.75 E
900.0 1.33 160.07 0.44 899.6 842.5 -24.8 25.3 169.6 24.83 S 4.58 E
1000.0 0.97 157.54 0.36 999.5 942.5 -26.7 27.2 168.8 26.70 S 5.29 E
1100.0 0.70 155.19 0.26 1099.5 1042.5 -28.0 28.6 168.2 28.04 S 5.87 E
1200.0 0.54 153.97 0.16 1199.5 1142.5 -29.0 29.7 167.7 29.02 S 6.34 E
1300.0 0.46 159.18 0.09 1299.5 1242.5 -29.8 30.6 167.4 29.82 S 6.69 E
1400.0 0.25 154.80 0.21 1399.5 1342.5 -30.4 31.2 167.2 30.39 S 6.93 E
1500.0 0.31 177.09 0.12 1499.5 1442.5 -30.9 31.6 167.2 30.86 S 7.03 E
1600.0 0.32 185.48 0.05 1599.5 1542.5 -31.4 32.2 167.4 31.40 S 7.02 E '---,
1700.0 0.31 188.37 0.02 1699.5 1642.5 -31.9 32.7 167.7 31.94 S 6.95 E
1800.0 0.31 192.01 0.02 1799.5 1742.4 -32.5 33.2 168.1 32.48 S 6.86 E
1900.0 0.25 201.33 0.08 1899.5 1842.4 -33.0 33.6 168.5 32.95 S 6.72 E
2000.0 0.25 230.64 0.13 1999.5 1942.4 -33.3 33.9 169.0 33.30 S 6.47 E
2100.0 0.16 220.72 0.09 2099.5 2042.4 -33.5 34.1 169.5 33.54 S 6.21 E
2200.0 0.10 206.91 0.06 2199.5 2142.4 -33.7 34.3 169.8 33.73 S 6.08 E
2300.0 0.11 163.25 0.08 2299.5 2242.4 -33.9 34.4 169.9 33.90 S 6.06 E
2400.0 0.46 49.30 0.51 2399.5 2342.4 -33.7 34.3 169.3 33.73 S 6.39 E
2
A Gyrodata Directional Survey
B.P.
Well: F-04,4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE510
MEASURED I N C L AZIMUTH
DEPTH
feet deg. deg.
DOGLEG
SEVERITY
deg./
100 ft.
VERTICAL
DEPTH
feet
SUBSEA
DEPTH
feet
VERTICAL CLOSURE
SECTION DIST. AZIMUTH
feet feet deg.
HORIZONTAL
COORDINATES
feet
2500.0 3.36 65.76 2.92 2499.4 2442.4 -32.3 33.6 163.8 32.26 S 9.37 E
2600.0 4.96 83.96 2.05 2599.2 2542.1 -30.6 34.7 151.9 30.61 S 16.33 E ----
2700.0 5.26 84.11 0.30 2698.8 2641. 7 -29.7 38.9 139.7 29.68 S 25.18 E
2800.0 7.14 63.43 2.89 2798.2 2741.1 -26.4 44.1 126.8 26.43 S 35.30 E
2900.0 9.31 56.83 2.36 2897.2 2840.1 -19.2 51.4 112.0 19.23 S 47.63 E
3000.0 11.01 61.66 1.91 2995.6 2938.5 -10.3 63.6 99.3 10.27 S 62.80 E
3050.0 12.26 63.08 2.56 3044.6 2987.5 -5.6 72.0 94.5 5.60 S 71.74 E
3100.0 13.98 64.46 3.49 3093.3 3036.2 -0.6 81.9 90.4 0.59 S 81. 92 E
3150.0 15.91 66.58 4.01 3141.6 3084.5 4.7 93.8 87.1 4.74 N 93.66 E
3200.0 17.43 68.84 3.31 3189.5 3132.4 10.2 107.4 84.6 10.16 N 106.93 E
3250.0 18.82 70.82 3.05 3237.0 3179.9 15.5 122.5 82.7 15.52 N 121.53 E
3300.0 19.83 71.95 2.15 3284.2 3227.1 20.8 138.8 81.4 20.79 N 137.21 E
3350.0 20.98 72.70 2.36 3331.0 3274.0 26.1 156.0 80.4 26.08 N 153.82 E
3400.0 22.4 7 73.4 7 3.04 3377.5 3320.4 31.5 174.4 79.6 31.46 N 171.52 E
3450.0 24.13 73.93 3.35 3423.4 3366.3 37.0 194.1 79.0 37.01 N 190.50 E
3500.0 25.75 74.65 3.28 3468.8 3411. 7 42.7 215.1 78.5 42.72 N 210.80 E '~
3550.0 27.1 0 75.31 2.77 3513.5 3456.5 48.5 237.3 78.2 48.48 N 232.29 E
3600.0 29.22 76.20 4.33 3557.6 3500.5 54.3 260.9 78.0 54.28 N 255.16 E
3650.0 31.47 76.33 4.51 3600.8 3543.7 60.3 286.1 77.8 60.28 N 279.69 E
3700.0 34.26 76.21 5.57 3642.7 3585.7 66.7 313.2 77.7 66.72 N 306.05 E
3750.0 36.55 76.19 4.59 3683.5 3626.4 73.6 342.2 77.6 73.63 N 334.17 E
3800.0 38.18 76.31 3.27 3723.2 3666.2 80.8 372.5 77.5 80.84 N 363.65 E
3850.0 38.95 76.25 1.53 3762.3 3705.3 88.2 403.7 77.4 88.23 N 393.93 E
3900.0 39.18 76.29 0.47 3801.2 3744.1 95.7 435.2 77.3 95.71 N 424.54 E
3
A Gyrodata Directional Survey
B.P.
Well: F-04,4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE510
MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet feet feet deg. feet
100 ft.
3950.0 39.23 76.45 0.23 3839.9 3782.8 103.2 466.8 77.2 103.16 N 455.25 E
4000.0 39.36 76.39 0.26 3878.6 3821.5 110.6 498.5 77.2 110.59 N 486.04 E ~
4050.0 39.33 76.38 0.07 3917.3 3860.2 118.1 530.2 77.1 118.05 N 516.84 E
4100.0 39.12 76.40 0.42 3956.0 3898.9 125.5 561.8 77.1 125.49 N 547.57 E
4150.0 39.04 76.4 7 0.18 3994.8 3937.7 132.9 593.3 77.1 132.89 N 578.21 E
4200.0 39.06 76.56 0.12 4033.6 3976.6 140.2 624.8 77.0 140.23 N 608.84 E
4250.0 39.35 76.55 0.58 4072.4 4015.3 147.6 656.4 77.0 147.58 N 639.58 E
4300.0 39.24 76.56 0.22 4111.1 4054.0 154.9 688.0 77.0 154.94 N 670.37 E
4350.0 38.95 76.69 0.59 4149.9 4092.8 162.2 719.6 77.0 162.24 N 701.05 E
4400.0 39.20 76.71 0.50 4188.7 4131.6 169.5 751.1 77.0 169.49 N 731.72 E
4450.0 39.14 76.78 0.15 4227.5 4170.4 176.7 782.7 77.0 176.73 N 762.47 E
4500.0 39.38 76.75 0.47 4266.2 4209.1 184.0 814.3 76.9 183.97 N 793.27 E
4550.0 38.91 76.89 0.94 4305.0 4247.9 191.2 845.9 76.9 191.17 N 824.00 E
4600.0 39.13 76.82 0.44 4343.8 4286.7 198.3 877.4 76.9 198.33 N 854.66 E
4650.0 39.22 76.84 0.17 4382.6 4325.5 205.5 909.0 76.9 205.52 N 885.41 E
4700.0 38.95 76.91 0.53 4421.4 4364.3 212.7 940.5 76.9 212.68 N 916.11 E
"- ~
4750.0 39.06 77.03 0.26 4460.2 4403.2 219.8 971.9 76.9 219.78 N 946.77 E
4800.0 39.06 77.12 0.11 4499.1 4442.0 226.8 1003.5 76.9 226.83 N 977.48 E
4850.0 39.05 77.08 0.05 4537.9 4480.8 233.9 1035.0 76.9 233.86 N 1008.18 E
4900.0 39.07 77.21 0.17 4576.7 4519.6 240.9 1066.5 76.9 240.87 N 1038.90 E
4950.0 39.15 . 77.22 0.16 4615.5 4558.4 247.8 1098.0 77.0 247.85 N 1069.66 E
5000.0 39.23 77.41 0.29 4654.3 4597.2 254.8 1129.6 77.0 254.79 N 11 00.48 E
5050.0 39.17 77.35 0.14 4693.0 4635.9 261.7 1161.2 77.0 261.69 N 1131.32 E
5100.0 39.14 77.33 0.08 4731.8 4674.7 268.6 1192.8 77.0 268.61 N 1162.12 E
4
A Gyrodata Directional Survey
B.P.
Well: F-04,4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE510
MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet feet feet deg. feet
100 ft.
5150.0 39.09 77.34 0.09 4770.6 4713.5 275.5 1224.3 77.0 275.52 N 1192.90 E
5200.0 39.03 77.38 0.12 4809.4 4752.3 282.4 1255.8 77.0 282.42 N 1223.64 E
~
5250.0 39.14 77.46 0.24 4848.2 4791.1 289.3 1287.3 77.0 289.29 N 1254.41 E
5300.0 39.14 77.41 0.06 4887.0 4829.9 296.2 1318.9 77.0 296.15 N 1285.22 E
5350.0 39.04 77.30 0.24 4925.8 4868.7 303.1 1350.4 77.0 303.05 N 1315.98 E
5400.0 39.16 77.32 0.25 4964.6 4907.5 310.0 1382.0 77.0 309.98 N 1346.75 E
5450.0 38.99 77.39 0.35 5003.4 4946.3 316.9 1413.5 77.0 316.88 N 1377.50 E
5500.0 39.32 77.54 0.67 5042.2 4985.1 323.7 1445.0 77.1 323.73 N 1408.32 E
5550.0 39.16 77.53 0.30 5080.9 5023.8 330.6 1476.7 77.1 330.56 N 1439.20 E
5600.0 39.32 77.44 0.34 5119.6 5062.6 337.4 1508.3 77.1 337.41 N 1470.08 E
5650.0 38.97 77.45 0.71 5158.4 5101.3 344.3 1539.9 77.1 344.28 N 1500.89 E
5700.0 39.02 77.53 0.15 5197.3 5140.2 351.1 1571.3 77.1 351.09 N 1531.61 E
5750.0 39.20 77.53 0.37 5236.1 5179.0 357.9 1602.9 77.1 357.90 N 1562.40 E
5800.0 38.99 77.50 0.42 5274.9 5217.8 364.7 1634.4 77.1 364.72 N 1593.19 E
5850.0 39.26 77.65 0.57 5313 .6 5256.6 371.5 1666.0 77.1 371.51 N 1624.00 E
5900.0 39.24 77.42 0.29 5352.4 5295.3 378.3 1697.6 77.1 378.33 N 1654.90 E
5950.0 39.22 77.46 0.06 5391.1 5334.0 385.2 1729.2 77.1 385.21 N 1685.77 E '-----
6000.0 39.21 77.61 0.19 5429.8 5372.8 392.0 1760.8 77.1 392.03 N 1716.63 E
6050.0 39.01 77.65 0.40 5468.6 5411.6 398.8 1792.4 77.1 398.79 N 1747.44 E
6100.0 39.24 77.68 0.47 5507.4 5450.4 405.5 1823.9 77.2 405.53 N 1778.26 E
6150.0 39.00 77.71 0.48 5546.2 5489.1 412.3 1855.5 77.2 412.26 N 1809.08 E
6200.0 39.22 77.63 0.45 5585.0 5527.9 419.0 1887.0 77.2 418.99 N 1839.90 E
6250.0 39.11 77.62 0.22 5623.8 5566.7 425.8 1918.6 77.2 425.76 N 1870.75 E
6300.0 38.88 77.49 0.50 5662.6 5605.6 432.5 1950.0 77.2 432.54 N 1901.47 E
5
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.87511
Location: F PAD, PRUDHOE BAY, AI<
Job Number: AK0402GCE5l0
MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet feet feet deg. feet
100 ft.
6350.0 39.02 77.42 0.31 5701.5 5644 .4 439.4 1981.5 77.2 439.37 N 1932.15 E
6400.0 38.95 77.43 0.15 5740.4 5683.3 446.2 2012.9 77.2 446.22 N 1962.85 E
6450.0 38.87 77.58 0.24 5779.3 5722.2 453.0 2044.3 77.2 453.01 N 1993.52 E ~
6500.0 39.26 77.51 0.78 5818.1 5761.0 459.8 2075.8 77.2 459.81 N 2024.28 E
6550.0 39.44 77.57 0.37 5856.8 5799.7 466.6 2107.6 77.2 466.65 N 2055.24 E
6600.0 39.20 77.58 0.47 5895.5 5838.4 473.5 2139.2 77.2 473.47 N 2086.18 E
6650.0 39.09 77.69 0.26 5934.2 5877.2 480.2 2170.8 77.2 480.22 N 2117.01 E
6700.0 39.61 77.55 1.04 5972.9 5915.8 487.0 2202.5 77.2 487.02 N 2147.98 E
6750.0 39.18 77.63 0.86 6011.5 5954.5 493.8 2234.2 77.2 493.84 N 2178.97 E
6800.0 39.16 77.49 0.18 6050.3 5993.2 500.6 2265.8 77.2 500.64 N 2209.81 E
6850.0 39.34 77.48 0.37 6089.0 6031.9 507.5 2297.4 77.2 507.50 N 2240.69 E
6900.0 39.09 77.71 0.58 6127.8 6070.7 514.3 2329.1 77.2 514.29 N 2271.57 E
6950.0 39.31 77.65 0.44 6166.5 6109.4 521.0 2360.7 77.2 521.03 N 2302.44 E
7000.0 38.98 77.75 0.67 6205.3 6148.2 527.8 2392.2 77.3 527.75 N 2333.28 E
7050.0 38.95 78.01 0.33 6244.2 6187.1 534.4 2423.7 77.3 534.35 N 2364.02 E
7100.0 39.18 78.12 0.47 6283.0 6225.9 540.9 2455.2 77.3 540.87 N 2394.84 E
7150.0 38.98 78.27 0.44 6321.8 6264.7 547.3 2486.7 77.3 547.32 N 2425.70 E ~
7200.0 39.24 78.33 0.53 6360.6 6303.5 553.7 2518.2 77.3 553.72 N 2456.58 E
7250.0 39.02 78.38 0.46 6399.4 6342.3 560.1 2549.8 77.3 560.09 N 2487.49 E
7300.0 38.40 78.25 1.24 6438.4 6381.3 566.4 2581.0 77.3 566.42 N 2518.11 E
7350.0 38.23 78.23 0.35 6477.6 6420.6 572.7 2612.0 77.3 572.74 N 2548.46 E
7400.0 37.98 78.24 0.51 6517.0 6459.9 579.0 2642.9 77.3 579.03 N 2578.66 E
7450.0 37.89 78.37 0.23 6556.4 6499.3 585.3 2673.6 77.4 585.26 N 2608.76 E
7500.0 37.86 78.46 0.13 6595.9 6538.8 591.4 2704.3 77.4 591.42 N 2638.83 E
6
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE510
fv1EASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet feet feet deg. feet
100 ft.
7550.0 37.53 78.52 0.67 6635.4 6578.4 597.5 2734.9 77.4 597.52 N 2668.79 E
7600.0 37.52 78.71 0.23 6675.1 6618.0 603.5 2765.3 77.4 603.53 N 2698.65 E
'--,
7650.0 37.20 78.72 0.65 6714.8 6657.8 609.5 2795.6 77.4 609.47 N 2728.40 E
7700.0 37.15 79.04 0.41 6754.7 6697.6 615.3 2825.8 7704 615.30 N 2758.05 E
7750.0 36.79 78.98 0.72 6794.6 6737.6 621.0 2855.9 77.4 621.03 N 2787.57 E
7800.0 36.57 79.18 0.50 6834.7 6777.6 626.7 2885.8 77.5 626.69 N 2816.89 E
7850.0 36.41 79.31 0.35 6874.9 6817.8 632.2 2915.5 77.5 632.24 N 2846.11 E
7900.0 36.06 79.49 0.74 6915.2 6858.2 637.7 2945.0 77.5 637.68 N 2875.16 E
7950.0 36.22 79.46 0.31 6955.6 6898.6 643.1 2974.5 77.5 643.06 N 2904.15 E
8000.0 35.82 79.70 0.85 6996.1 6939.0 648.4 3003.9 77.5 648.38 N 2933.07 E
8050.0 35.87 79.96 0.33 7036.6 6979.5 653.6 3033.1 77.6 653.55 N 2961.89 E
8100.0 35.62 80.17 0.55 7077.2 7020.1 658.6 3062.3 77.6 658.59 N 2990.66 E
8150.0 35.40 80.73 0.78 7117.9 7060.8 663.4 3091.3 77.6 663.41 N 3019.30 E
8200.0 35.43 80.82 0.12 7158.6 7101.6 668.1 3120.3 77.6 668.06 N 3047.90 E
8250.0 35.02 81.17 0.91 7199.5 7142.4 672.6 3149.1 77.7 672.57 N 3076.39 E
8300.0 35.13 81.19 0.22 7240.4 7183.3 677.0 3177.7 77.7 676.98 N 3104.78 E
8350.0 34.70 81.34 0.88 7281.4 7224.3 681.3 3206.3 77.7 681.33 N 3133.07 E ~.
8400.0 34.56 81.53 0.37 7322.5 7265.5 685.6 3234.7 77.8 685.56 N 3161.17 E
8450.0 34.39 81.52 0.32 7363.7 7306.7 689.7 3262.9 77.8 689.73 N 3189.16 E
8500.0 33.92 81. 75 0.99 7405.1 7348.0 693.8 3290.9 77.8 693.81 N 3216.94 E
8550.0 33.68 82.27 0.75 7446.7 7389.6 697.7 3318.6 77.9 697.68 N 3244.48 E
8600.0 33.55 82.64 0.48 7488.3 7431.2 701.3 3346.2 77.9 701.31 N 3271.92 E
8650.0 33.67 83.03 0.48 7529.9 7472.9 704.8 3373.8 77.9 704.76 N 3299.38 E
8700.0 33.74 83.28 0.32 7571.5 7514.5 708.1 3401.4 78.0 708.07 N 3326.93 E
7
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE510
MEASURED INCL AZIMUTH DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet feet feet deg. feet
100 ft.
8750.0 34.10 83.67 0.84 7613.0 7556.0 711.2 3429.2 78.0 711.24 N 3354.65 E
8800.0 34.06 83.54 0.16 7654.4 7597.4 714.4 3457.1 78.1 714.36 N 3382.49 E ~'
8850.0 34.09 84.22 0.76 7695.9 7638.8 717.3 3485.0 78.1 717.35 N 3410.34 E
8900.0 34.22 84.77 0.67 7737.2 7680.2 720.0 3512.9 78.2 720.04 N 3438.29 E
8950.0 34.55 86.46 2.01 7778.5 7721.4 722.2 3540.9 78.2 722.20 N 3466.44 E
9000.0 34.63 88.03 1.79 7819.7 7762.6 723.6 3568.9 78.3 723.56 N 3494.79 E
9050.0 34.89 88.55 0.81 7860.7 7803.7 724.4 3597.0 78.4 724.41 N 3523.28 E
9100.0 35.10 90.41 2.16 7901.7 7844.6 724.7 3625.1 78.5 724.67 N 3551.95 E
9150.0 35.13 91.55 1.32 7942.6 7885.5 724.2 3653.2 78.6 724.18 N 3580.71 E
9200.0 35.39 92.20 0.91 7983.4 7926.4 723.2 3681.3 78.7 723.24 N 3609.56 E
9250.0 35.23 92.4 7 0.44 8024.2 7967.2 722.1 3709.4 78.8 722.06 N 3638.44 E
9300.0 34.75 92.73 1.02 8065.2 8008.1 720.8 3737.2 78.9 720.76 N 3667.08 E
9350.0 34.53 93.51 0.99 8106.3 8049.3 719.2 3764.8 79.0 719.21 N 3695.46 E
9400.0 35.76 94.14 2.55 8147.2 8090.1 717.3 3792.6 79.1 717.29 N 3724.18 E
9450.0 35.25 95.40 1.78 8187.9 8130.9 714.9 3820.6 79.2 714.88 N 3753.11 E
9500.0 35.21 96.98 1.82 8228.8 8171.7 711.8 3848.2 79.3 711.77 N 3781.79 E
97.47 0.56 8269.6 8212.6 708.1 3875.6 79.5 708.15 N 3810.38 E .~
9550.0 35.19
9600.0 35.47 98.81 1.65 8310.4 8253.3 704.1 3903.0 79.6 704.05 N 3839.00 E
9650.0 35.52 100.11 1.51 8351.1 8294.1 699.3 3930.3 79.8 699.28 N 3867.63 E
9700.0 35.46 101.78 1.94 8391. 8 8334.8 693.8 3957.4 79.9 693.77 N 3896.13 E
9750.0 35.72 103.37 1.93 8432.5 8375.4 687.4 3984.3 80.1 687.43 N 3924.52 E
9800.0 35.51 104.00 0.84 8473.1 8416.1 680.5 4011.0 80.2 680.54 N 3952.82 E
9850.0 35.68 104.08 0.34 8513.8 8456.7 673.5 4037.6 80.4 673.48 N 3981.05 E
9900.0 35.39 104.22 0.60 8554.5 8497.4 666.4 4064.2 80.6 666.38 N 4009.23 E
9950.0 35.06 104.43 0.69 8595.3 8538.3 659.2 4090.6 80.7 659.24 N 4037.17 E
8
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.511/3.511/2.87511
Location: F PAD, PRUDHOE BA Y, AK
Job Number: AK0402GCE51 0
MEASURED I N C L AZIMUTH
DEPTH
feet deg. deg.
DOGLEG
SEVERITY
deg./
100 ft.
VERTICAL
DEPTH
feet
SUBSEA
DEPTH
feet
VERTICAL CLOSURE
SECTION DIST. AZIMUTH
feet feet deg.
HORIZONTAL
COORDINATES
feet
10000.0 35.18 104.33 0.26 8636.2 8579.2 652.1 4117.0 80.9 652.10 N 4065.03 E ""':.~~J
10050.0 34.90 1 04.3 8 0.56 8677.2 8620.1 645.0 4143.4 81.0 644.98 N 4092.85 E
10100.0 34.57 104.36 0.66 8718.3 8661.2 637.9 4169.5 81.2 637.91 N 4120.44 E
10150.0 34.02 104.92 1.28 8759.6 8702.5 630.8 4195.4 81.4 630.80 N 4147.70 E
10200.0 33.92 104.76 0.26 8801.0 8744.0 623.6 4221.0 81.5 623.64 N 4174.71 E
10250.0 33.58 104.94 0.72 8842.6 8785.5 616.5 4246.6 81.7 616.52 N 4201.56 E
10300.0 33.43 104.95 0.31 8884.3 8827.2 609.4 4271.9 81.8 609.40 N 4228.23 E
Final Station Closure: Distance: 4271.92 ft Az: 81.80 deg.
.~--
9
A Gyrodata Directional Survey
for
B.P.
Location: F PAD, PRUDHOE BAY, AK
~
Well: F-04, 4.5"/3.5"/2.875"
Job Number: AK0402GCE510SS
Run Date: 4/2/02 9:20: 11 AM
Surveyor: Tom Stoddard
Calculation Method: MINIMUM CORV A TURE
Survey Latitude: 70.336000 deg. N Survey Longitude: 148.900000 deg. E
Sub-sea Correction from Vertical Reference: 57.07 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North ~
Vertical Section Calculated from Well Head Location
Closure Calculated fÌ'om Well Head Location
Horizontal Coordinates Calculated from Well Head Location
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BA Y, AK
Job Nwnber: AK0402GCE51 ass
SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet feet deg. feet
100 ft.
-57.1 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.00 N 0.00 E
42.9 0.66 190.40 0.66 100.0 -0.6 0.6 190.4 0.56 S 0.10W ~
142.9 0.87 180.54 0.25 200.0 -1.9 1.9 186.5 1.89 S 0.21W
242.9 1.38 176.73 0.51 300.0 -3.9 3.9 182.3 3.85 S 0.15W
342.9 1.83 172.82 0.47 399.9 -6.6 6.6 179.0 6.64 S 0.12 E
442.8 2.40 168.44 0.59 499.9 -10.3 10.3 175.9 10.27 S 0.73 E
542.7 2.60 166.57 0.22 599.8 -14.5 14.6 173.4 14.53 S 1.68 E
642.6 2.42 164.93 0.19 699.7 -18.8 19.0 171.6 18.78 S 2.76 E
742.5 1.75 163.31 0.67 799.6 -22.3 22.6 170.5 22.28 S 3.75 E
842.5 1.33 160.07 0.44 899.6 -24.8 25.3 169.6 24.83 S 4.58 E
942.5 0.97 157.54 0.36 999.5 -26.7 27.2 168.8 26.70 S 5.29 E
1042.5 0.70 155.19 0.26 1099.5 -28.0 28.6 168.2 28.04 S 5.87 E
1142.5 0.54 153.97 0.16 1199.5 -29.0 29.7 167.7 29.02 S 6.34 E
1242.5 0.46 159.18 0.09 1299.5 -29.8 30.6 167.4 29.82 S 6.69 E
1342.5 0.25 154.80 0.21 1399.5 -30.4 31.2 167.2 30.39 S 6.93 E
1442.5 0.31 177.09 0.12 1499.5 -30.9 31.6 167.2 30.86 S 7.03 E ..~
1542.5 0.32 185.48 0.05 1599.5 -31.4 32.2 167.4 31.40 S 7.02 E
1642.5 0.31 188.37 0.02 1699.5 -31.9 32.7 167.7 31. 94 S 6.95 E
1742.4 0.31 192.01 0.02 1799.5 -32.5 33.2 168.1 32.48 S 6.86 E
1842.4 0.25 201.33 0.08 1899.5 -33.0 33.6 168.5 32.95 S 6.72 E
1942.4 0.25 230.64 0.13 1999.5 -33.3 33.9 169.0 33.30 S 6.47 E
2042.4 0.16 220.72 0.09 2099.5 -33.5 34.1 169.5 33.54 S 6.21 E
2142.4 0.10 206.91 0.06 2199.5 -33.7 34.3 169.8 33.73 S 6.08 E
2242.4 0.11 163.25 0.08 2299.5 -33.9 34.4 169.9 33.90 S 6.06 E
2342.4 0.46 49.30 0.51 2399.5 -33.7 34.3 169.3 33.73 S 6.39 E
2
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE51 OSS
SUBSEA
DEPTH
feet
INCL
AZIMUTH
deg.
deg.
DOGLEG
SEVERITY
deg.l
100 ft.
VERTICAL VERTICAL
DEPTH SECTION
feet feet
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
COORDINATES
feet
2442.4 3.36 65.76 2.92 2499.4 -32.3 33.6 163.8 32.26 S 9.37 E --
2542.1 4.96 83.96 2.05 2599.2 -30.6 34.7 151.9 30.61 S 16.33 E
2641. 7 5.26 84.11 0.30 2698.8 -29.7 38.9 139.7 29.68 S 25.18 E
2741.1 7.14 63.43 2.89 2798.2 -26.4 44.1 126.8 26.43 S 35.30 E
2840.1 9.31 56.83 2.36 2897.2 -19.2 51.4 112.0 19.23 S 47.63 E
2938.5 11.01 61.66 1.91 2995.6 -10.3 63.6 99.3 10.27 S 62.80 E
2987.5 12.26 63.08 2.56 3044.6 -5.6 72.0 94.5 5.60 S 71.74 E
3036.2 13.98 64.46 3.49 3093.3 -0.6 81.9 90.4 0.59 S 81. 92 E
3084.5 15.91 66.58 4.01 3141.6 4.7 93.8 87.1 4.74 N 93.66 E
3132.4 17.43 68.84 3.31 3189.5 10.2 107.4 84.6 10.16 N 106.93 E
3179.9 18.82 70.82 3.05 3237.0 15.5 122.5 82.7 15.52 N 121.53 E
3227.1 19.83 71.95 2.15 3284.2 20.8 138.8 81.4 20.79 N 137.21 E
3274.0 20.98 72.70 2.36 3331.0 26.1 156.0 80.4 26.08 N 153.82 E
3320.4 22.47 73.4 7 3.04 3377.5 31.5 174.4 79.6 31.46 N 171.52 E
3366.3 24.13 73.93 3.35 3423.4 37.0 194.1 79.0 37.01 N 190.50 E
3411.7 25.75 74.65 3.28 3468.8 42.7 215.1 78.5 42.72 N 210.80 E .~
3456.5 27.10 75.31 2.77 3513.5 48.5 237.3 78.2 48.48 N 232.29 E
3500.5 29.22 76.20 4.33 3557.6 54.3 260.9 78.0 54.28 N 255.16 E
3543.7 31.47 76.33 4.51 3600.8 60.3 286.1 77.8 60.28 N 279.69 E
3585.7 34.26 76.21 5.57 3642.7 66.7 313.2 77.7 66.72 N 306.05 E
3626.4 36.55 76.19 4.59 3683.5 73.6 342.2 77.6 73.63 N 334.17 E
3666.2 38.18 76.31 3.27 3723.2 80.8 372.5 77.5 80.84 N 363.65 E
3705.3 38.95 76.25 1.53 3762.3 88.2 403.7 77.4 88.23 N 393.93 E
3744.1 39.18 76.29 0.47 3801.2 95.7 435.2 77.3 95.71 N 424.54 E
3
A Gyrodata Directional Survey
B.P.
Well: F-04,4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE51 OSS
SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet feet deg. feet
100 ft.
3782.8 39.23 76.45 0.23 3839.9 103.2 466.8 77.2 103.16 N 455.25 E
-
3821.5 39.36 76.39 0.26 3878.6 110.6 498.5 77.2 110.59 N 486.04 E
3860.2 39.33 76.38 0.07 3917.3 118.1 530.2 77.1 118.05 N 516.84 E
3898.9 39.12 76.40 0.42 3956.0 125.5 561.8 77.1 125.49 N 547.57 E
3937.7 39.04 76.47 0.18 3994.8 132.9 593.3 77.1 132.89 N 578.21 E
3976.6 39.06 76.56 0.12 4033.6 140.2 624.8 77.0 140.23 N 608.84 E
4015.3 39.35 76.55 0.58 4072.4 147.6 656.4 77.0 147.58 N 639.58 E
4054.0 39.24 76.56 0.22 4111.1 154.9 688.0 77.0 154.94 N 670.37 E
4092.8 38.95 76.69 0.59 4149.9 162.2 719.6 77.0 162.24 N 701.05 E
4131.6 39.20 76.71 0.50 4188.7 169.5 751.1 77.0 169.49 N 731.72 E
4170.4 39.14 76.78 0.15 4227.5 176.7 782.7 77.0 176.73 N 762.47 E
4209.1 39.38 76.75 0.47 4266.2 184.0 814.3 76.9 183.97 N 793.27 E
4247.9 38.91 76.89 0.94 4305.0 191.2 845.9 76.9 191.17 N 824.00 E
4286.7 39.13 76.82 0.44 4343.8 198.3 877.4 76.9 198.33 N 854.66 E
4325.5 39.22 76.84 0.17 4382.6 205.5 909.0 76.9 205.52 N 885.41 E
4364.3 38.95 76.91 0.53 4421.4 212.7 940.5 76.9 212.68 N 916.11 E
--
4403.2 39.06 77.03 0.26 4460.2 219.8 971.9 76.9 219.78 N 946.77 E
4442.0 39.06 77.12 0.11 4499.1 226.8 1003.5 76.9 226.83 N 977.48 E
4480.8 39.05 77.08 0.05 4537.9 233.9 1035.0 76.9 233.86 N 1008.18 E
4519.6 39.07 77.21 0.17 4576.7 240.9 1066.5 76.9 240.87 N 1038.90 E
4558.4 39.15 77.22 0.16 4615.5 247.8 1098.0 77.0 247.85 N 1069.66 E
4597.2 39.23 77.41 0.29 4654.3 254.8 1129.6 77.0 254.79 N 1100.48 E
4635.9 39.17 77.35 0.14 4693.0 261.7 1161.2 77.0 261.69 N 1131.32 E
4674.7 39.14 77.33 0.08 4731.8 268.6 1192.8 77.0 268.61 N 1162.12 E
4
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE51 OSS
SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet feet deg. feet
100 ft.
4713.5 39.09 77.34 0.09 4770.6 275.5 1224.3 77.0 275.52 N 1192.90 E
4752.3 39.03 77.38 0.12 4809.4 282.4 1255.8 77.0 282.42 N 1223.64 E "-'
4791.1 39.14 77.46 0.24 4848.2 289.3 1287.3 77.0 289.29 N 1254.41 E
4829.9 39.14 77.41 0.06 4887.0 296.2 1318.9 77.0 296.15 N 1285.22 E
4868.7 39.04 77.30 0.24 4925.8 303.1 1350.4 77.0 303.05 N 1315.98 E
4907.5 39.16 77.32 0.25 4964.6 310.0 1382.0 77.0 309.98 N 1346.75 E
4946.3 38.99 77.39 0.35 5003.4 316.9 1413.5 77.0 316.88 N 1377.50 E
4985.1 39.32 77.54 0.67 5042.2 323.7 1445.0 77.1 323.73 N 1408.32 E
5023.8 39.16 77.53 0.30 5080.9 330.6 1476.7 77.1 330.56 N 1439.20 E
5062.6 39.32 77.44 0.34 5119.6 337.4 1508.3 77.1 337.41 N 1470.08 E
5101.3 38.97 77.45 0.71 5158.4 344.3 1539.9 77.1 344.28 N 1500.89 E
5140.2 39.02 77.53 0.15 5197.3 351.1 1571.3 77.1 351.09 N 1531.61 E
5179.0 39.20 77.53 0.37 5236.1 357.9 1602.9 77.1 357.90 N 1562.40 E
5217.8 38.99 77.50 0.42 5274.9 364.7 1634.4 77.1 364.72 N 1593.19 E
5256.6 39.26 77.65 0.57 5313.6 371.5 1666.0 77.1 371.51 N 1624.00 E
5295.3 39.24 77.42 0.29 5352.4 378.3 1697.6 77.1 378.33 N 1654.90 E /
5334.0 39.22 77.46 0.06 5391.1 - 385.2 1729.2 77.1 385.21 N 1685.77 E --
5372.8 39.21 77.61 0.19 5429.8 392.0 1760.8 77.1 392.03 N 1716.63 E
5411.6 39.01 77.65 0.40 5468.6 398.8 1792.4 77.1 398.79 N 1747.44 E
5450.4 39.24 77.68 0.47 5507.4 405.5 1823.9 77.2 405.53 N 1778.26 E
5489.1 39.00 77.71 0.48 5546.2 412.3 1855.5 77.2 412.26 N 1809.08 E
5527.9 39.22 77.63 0.45 5585.0 419.0 1887.0 77.2 418.99 N 1839.90 E
5566.7 39.11 77.62 0.22 5623.8 425.8 1918.6 77.2 425.76 N 1870.75 E
5605.6 38.88 77.49 0.50 5662.6 432.5 1950.0 77.2 432.54 N 1901.47 E
5
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE510SS
SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg./ feet feet feet deg. feet
100 ft.
5644.4 39.02 77.42 0.31 5701.5 439.4 1981.5 77.2 439.37 N 1932.15 E
5683.3 38.95 77.43 0.15 5740.4 446.2 2012.9 77.2 446.22 N 1962.85 E "--
5722.2 38.87 77.58 0.24 5779.3 453.0 2044.3 77.2 453.01 N 1993.52 E
5761.0 39.26 77.51 0.78 5818.1 459.8 2075.8 77.2 459.81 N 2024.28 E
5799.7 39.44 77.57 0.37 5856.8 466.6 2107.6 77.2 466.65 N 2055.24 E
5838.4 39.20 77.58 0.47 5895.5 473.5 2139.2 77.2 473.47 N 2086.18 E
5877.2 39.09 77.69 0.26 5934.2 480.2 2170.8 77.2 480.22 N 2117.01 E
5915.8 39.61 77.55 1.04 5972.9 487.0 2202.5 77.2 487.02 N 2147.98 E
5954.5 39.18 77.63 0.86 6011.5 493.8 2234.2 77.2 493.84 N 2178.97 E
5993.2 39.16 77.49 0.18 6050.3 500.6 2265.8 77.2 500.64 N 2209.81 E
6031.9 39.34 77.48 0.37 6089.0 507.5 2297.4 77.2 507.50 N 2240.69 E
6070.7 39.09 77.71 0.58 6127.8 514.3 2329.1 77.2 514.29 N 2271.57 E
6109.4 39.31 77.65 0.44 6166.5 521.0 2360.7 77.2 521.03 N 2302.44 E
6148.2 38.98 77.75 0.67 6205.3 527.8 2392.2 77.3 527.75 N 2333.28 E
6187.1 38.95 78.01 0.33 6244.2 534.4 2423.7 77.3 534.35 N 2364.02 E
6225.9 39.18 78.12 0.47 6283.0 540.9 2455.2 77.3 540.87 N 2394.84 E
"-
6264.7 38.98 78.27 0.44 6321.8 547.3 2486.7 77.3 547.32 N 2425.70 E
6303.5 39.24 78.33 0.53 6360.6 553.7 2518.2 77.3 553.72 N 2456.58 E
6342.3 39.02 78.38 0.46 6399.4 560.1 2549.8 77.3 560.09 N 2487.49 E
6381.3 38.40 78.25 1.24 6438.4 566.4 2581.0 77.3 566.42 N 2518.11 E
6420.6 38.23 78.23 0.35 6477.6 572.7 2612.0 77.3 572.74 N 2548.46 E
6459.9 37.98 78.24 0.51 6517.0 579.0 2642.9 77.3 579.03 N 2578.66 E
6499.3 37.89 78.37 0.23 6556.4 585.3 2673.6 77.4 585.26 N 2608.76 E
6538.8 37.86 78.46 0.13 6595.9 591.4 2704.3 77.4 591.42 N 2638.83 E
6
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE51 OSS
SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet feet deg. feet
100 ft.
6578.4 37.53 78.52 0.67 6635.4 597.5 2734.9 77.4 597.52 N 2668.79 E
6618.0 37.52 78.71 0.23 6675.1 603.5 2765.3 77.4 603.53 N 2698.65 E -
6657.8 37.20 78.72 0.65 6714.8 609.5 2795.6 77.4 609.47 N 2728.40 E
6697.6 37.15 79.04 0.41 6754.7 615.3 2825.8 77.4 615.30 N 2758.05 E
6737.6 36.79 78.98 0.72 6794.6 621.0 2855.9 77.4 621.03 N 2787.57 E
6777.6 36.57 79.18 0.50 6834.7 626.7 2885.8 77.5 626.69 N 2816.89 E
6817.8 36.41 79.31 0.35 6874.9 632.2 2915.5 77.5 632.24 N 2846.11 E
6858.2 36.06 79.49 0.74 6915.2 637.7 2945.0 77.5 637.68 N 2875.16 E
6898.6 36.22 79.46 0.31 6955.6 643.1 2974.5 77.5 643.06 N 2904.15 E
6939.0 35.82 79.70 0.85 6996.1 648.4 3003.9 77.5 648.38 N 2933.07 E
6979.5 35.87 79.96 0.33 7036.6 653.6 3033.1 77.6 653.55 N 2961.89 E
7020.1 35.62 80.17 0.55 7077.2 658.6 3062.3 77.6 658.59 N 2990.66 E
7060.8 35.40 80.73 0.78 7117.9 663.4 3091.3 77.6 663.41 N 3019.30 E
7101.6 35.43 80.82 0.12 7158.6 668.1 3120.3 77.6 668.06 N 3047.90 E
7142.4 35.02 81.17 0.91 7199.5 672.6 3149.1 77.7 672.57 N 3076.39 E
7183.3 35.13 81.19 0.22 7240.4 677.0 3177.7 77.7 676.98 N 3104.78 E '-,
7224.3 34.70 81.34 0.88 7281.4 681.3 3206.3 77.7 681.33 N 3133.07 E
7265.5 34.56 81.53 0.37 7322.5 685.6 3234.7 77.8 685.56 N 3161.17 E
7306.7 34.39 81.52 0.32 7363.7 689.7 3262.9 77.8 689.73 N 3189.16 E
7348.0 33.92 81. 75 0.99 7405.1 693.8 3290.9 77.8 693.81 N 3216.94 E
7389.6 33.68 82.27 0.75 7446.7 697.7 3318.6 77.9 697.68 N 3244.48 E
7431.2 33.55 82.64 0.48 7488.3 701.3 3346.2 77.9 701.31 N 3271.92 E
7472.9 33.67 83.03 0.48 7529.9 704.8 3373.8 77.9 704.76 N 3299.38 E
7514.5 33.74 83.28 0.32 7571.5 708.1 3401.4 78.0 708.07 N 3326.93 E
7
A Gyrodata Directional Survey
B.P.
Well: F-04, 4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BAY, AK
Job Number: AK0402GCE51 OSS
SUBSEA INCL AZIMUTH DOGLEG VERTICAL VERTICAL CLOSURE HORIZONTAL
DEPTH SEVERITY DEPTH SECTION DIST. AZIMUTH COORDINATES
feet deg. deg. deg.l feet feet feet deg. feet
100 ft.
7556.0 34.10 83.67 0.84 7613.0 711.2 3429.2 78.0 711.24 N 3354.65 E
7597.4 34.06 83.54 0.16 7654.4 714.4 3457.1 78.1 714.36 N 3382.49 E -
7638.8 34.09 84.22 0.76 7695.9 717.3 3485.0 78.1 717.35 N 3410.34 E
7680.2 34.22 84.77 0.67 7737.2 720.0 3512.9 78.2 720.04 N 3438.29 E
7721.4 34.55 86.46 2.01 7778.5 722.2 3540.9 78.2 722.20 N 3466.44 E
7762.6 34.63 88.03 1.79 7819.7 723.6 3568.9 78.3 723.56 N 3494.79 E
7803.7 34.89 88.55 0.81 7860.7 724.4 3597.0 78.4 724.41 N 3523.28 E
7844.6 35.10 90.41 2.16 7901.7 724.7 3625.1 78.5 724.67 N 3551.95 E
7885.5 35.13 91.55 1.32 7942.6 724.2 3653.2 78.6 724.18 N 3580.71 E
7926.4 35.39 92.20 0.91 7983.4 723.2 3681.3 78.7 723.24 N 3609.56 E
7967.2 35.23 92.47 0.44 8024.2 722.1 3709.4 78.8 722.06 N 3638.44 E
8008.1 34.75 92.73 1.02 8065.2 720.8 3737.2 78.9 720.76 N 3667.08 E
8049.3 34.53 93.51 0.99 8106.3 719.2 3764.8 79.0 719.21 N 3695.46 E
8090.1 35.76 94.14 2.55 8147.2 717.3 3792.6 79.1 717.29 N 3724.18 E
8130.9 35.25 95.40 1.78 8187.9 714.9 3820.6 79.2 714.88 N 3753.11 E
8171.7 35.21 96.98 1.82 8228.8 711.8 3848.2 79.3 711.77 N 3781.79 E ~
8212.6 35.19 97.47 0.56 8269.6 708.1 3875.6 79.5 708.15 N 3810.38 E
8253.3 35.47 98.81 1.65 8310.4 704.1 3903.0 79.6 704.05 N 3839.00 E
8294.1 35.52 100.11 1.51 8351.1 699.3 3930.3 79.8 699.28 N 3867.63 E
8334.8 35.46 101.78 1.94 8391.8 693.8 3957.4 79.9 693.77 N 3896.13 E
8375.4 35.72 103.37 1.93 8432.5 687.4 3984.3 80.1 687.43 N 3924.52 E
8416.1 35.51 104.00 0.84 8473.1 680.5 4011. 0 80.2 680.54 N 3952.82 E
8456.7 35.68 104.08 0.34 8513.8 673.5 4037.6 80.4 673.48 N 3981.05 E
8497.4 35.39 104.22 0.60 8554.5 666.4 4064.2 80.6 666.38 N 4009.23 E
8538.3 35.06 104.43 0.69 8595.3 659.2 4090.6 80.7 659.24 N 4037.17 E
8
A Gyrodata Directional Survey
B.P.
Well: F-04,4.5"/3.5"/2.875"
Location: F PAD, PRUDHOE BA Y, AK
Job Number: AK0402GCE51 OSS
SUBSEA
DEPTH
feet
INCL
AZIMUTH
deg.
deg.
DOGLEG
SEVERITY
deg.l
100 ft.
VERTICAL VERTICAL
DEPTH SECTION
feet feet
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
COORDINATES
feet
8579.2 35.18 104.33 0.26 8636.2 652.1 4117.0 80.9 652.10 N 4065.03 E '-
8620.1 34.90 104.38 0.56 8677.2 645.0 4143.4 81.0 644.98 N 4092.85 E
8661.2 34.57 104.36 0.66 8718.3 637.9 4169.5 81.2 637.91 N 4120.44 E
8702.5 34.02 104.92 1.28 8759.6 630.8 4195.4 81.4 630.80 N 4147.70 E
8744.0 33.92 104.76 0.26 8801.0 623.6 4221.0 81.5 623.64 N 4174.71 E
8785.5 33.58 104.94 0.72 8842.6 616.5 4246.6 81.7 616.52 N 4201.56 E
8827.2 33.43 104.95 0.31 8884.3 609.4 4271.9 81.8 609.40 N 4228.23 E
Final Station Closure: Distance: 4271.92 ft Az: 81.80 deg.
"-
9
gyrq'data
)
)
4. QUALITY CONTROL
~fa
)
QUALITY CONTROL REPORT
JOB NUMBER: AK0402GCE510
TOOL NUMBER:
MAXIMUM GYRO TEMPERATURE:
MAXIMUM AMBIENT TEMPERATURE:
MAXIMUM INCLINATION:
AVERAGE AZIMUTH:
WIRELlNE REZERO VALUE:
REZERO ERROR I K :
CALIBRATION USED FOR FIELD SURVEY:
CALIBRATION USED FOR FINAL SURVEY:
PRE JOB MASS BALANCE OFFSET CHECK:
POST JOB MASS BALANCE OFFSET CHECKl :
CONDITION OF SHOCK WATCHES
UPON ARRIVAL AT RIG:
UPON COMPLETION OF SURVEY:
UPON RETURN TO ATLAS
BOTTOM LINE COMPARISIONS
M.D.
INC AZIMUTH
FIELD SURVEY
FINAL SURVEY
10300 33.00
10300 33.43
104.00
104.95
811
78.26 C
22.74 C
39.44
90.21
)
Add 10' to outrun
1.03
4207
4207
.48
.27
OK
OK
OK
TVD
8854.90
8884.3
NORTHING EASTING
672 N
609.4N
4312 E
4228.2E
gyrojdata
)
)
FUNCTION TEST
JOB NUMBER: AK0402GCE510
5 Survey stations were collected at the measured depth shown below. The tables show the
repeatability of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft
1
2
3
4
5
3000
11.01
11.01
11.01
11.01
11.01
AZIMUTH
M.D. ft
1
2
3
4
5
3000
61.76
61.66
61.60
61.54
61.69
gyrofdata
)
,
"
5. EQUIPMENT AND CHRONOLOGICAL REPORT
gyrqIdata
)
)
EQUIPMENT REPORT
JOB NUMBER: AK0402GCE510
DOWNHOLE ELECTRONICS SURFACE ELECTRONICS
PRIMARY
TOOL No. 811 COMPUTER A0693
GYRO SECTION A0307 POWER SUPPLY
DATA SECTION C0202 PRINTER A0029
POWER SECTION C0206 INTERFACE A0143
BACKUP
TOOL No. 405 COMPUTER A0921
GYRO SECTION A0097 POWER SUPPLY A0085
DATA SECTION C0159 PRINTER
POWER SECTION C0197 INTERFACE A0166
WIRELlNE COMPANY:
SCHLUMBERGER
CABLE SIZE:
7/32"
RUNNING GEAR
TOTAL LENGTH OF TOOL: 30'
MAXIMUM 0.0. : 1.75
TOTAL WEIGHT OF TOOL: 240
WEDNESDAY, 4/03/02
07:00 SUBMIT RESULTS
11 :45 TO ANCHORAGE
TUESDAY, 4/02/02
07:30 TO LOCATION
08:15 ARRIVE LOCATION, MU TOOL
09:30 RU WIRELINE, MU TOOL
10:15 PU TOOL, PRESSURE TEST LUBRICATOR
11:00 START RUN
12:15 SURVEY TO 3000'
13:45 SURVEY TO 10300' CONTINUOUS
15:00 SURFVEY OUT
15:30 LD TOOL
16:00 BD TOOL
16:45 TO DEADHORSE
22:00 CHECK TOOL PROCESS SURVEY
MONDAY, 4/01102
11:15 TO SLOPE
13:10 ARRIVE SLOPE
21:00 CHECK TOOLS AND RUNNING GEAR
JOB NUMBER: AK0402GCE510
CHRONOLOGICAL REPORT
)
.,)
l
gyrojdata
)
)
B,..
BP
Baker Hughes INTEQ Survey Report
............."."...."'.........,,.....
INTEQ
Company: SP Amoco
Field: Prudhoe Bay
Site: PB F Pad
Well: F-04
Wellpath: F-04A
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Date: 3/27/2003 Time: 16:15:16 Page:
Co~ordinatè(NE) Reference: Well: F-04; True North
Vertical (TVi>j Reference: 4 : 042/2/1971 00:00 57.1
Section (YS) Reference: Well (0.00N;0.00E,350.00Azi)
Survey Calculation Method: MinimuillCur'Vature Db: Oracle
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2002
Site: PB F Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5972527.29 ft
650960.70 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 19 55.283 N
148 46 31.468 W
True
1 .15 deg
Well: F-04 Slot Name: 04
F-04
Well Position: +N/-S 1280.42 ft Northing: 5973827.99 ft Latitude: 70 20 7.875 N
+E/-W 1025.27 ft Easting : 651959.92 ft Longitude: 148 46 1 .527 W
Position Uncertainty: 0.00 ft
Wellpath: F -04A Drilled From: F-04APB 1
500292008901 Tie-on Depth: 10783.00 ft
Current Datum: 4: 042/2/1971 00:00 Height 57.10 ft Above System Datum: Mean Sea Level
Magnetic Data: 1/9/2003 Declination: 25.96 deg
Field Strength: 57536 n1' Mag Dip Angle: 80.83 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 350.00
Survey Program for Definitive Wellpath
Date: 3/6/2003 Validated: Yes Version: 17
Actual From To Survey Toolcode Tool Name
ft ft
100.00 10300.00 Gyro (0) GYD-GC-MS Gyrodata gyrocompassing m/s
10300.60 10783.00 MWD (2) MWD MWD - Standard
10783.00 11206.00 MWD MWD MWD - Standard
Annotation
10783.00 9028.28 KOP
11206.00 9018.83 TD
Survey: MWD Start Date: 2/27/2003
Company: Baker Hughes INTEQ Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
10783.00 91.31 356.78 9028.28 8971.18 1024.90 3941.44 5974932.46 655879.49 324.91 0.00
10812.45 95.65 4.94 9026.49 8969.39 1054.26 3941.88 5974961.82 655879.34 353.74 31.32
10844.95 94.91 5.77 9023.50 8966.40 1086.48 3944.90 5974994.10 655881 .70 384.95 3.41
10876.06 95.01 8.89 9020.81 8963.71 1117.22 3948.85 5975024.91 655885.03 414.53 10.00
10917.81 94.88 15.29 9017.20 8960.10 1157.87 3957.56 5975065.72 655892.91 453.06 15.28
10954.95 92.95 18.91 9014.67 8957.57 1193.28 3968.45 5975101.34 655903.09 486.03 11.03
10989.45 89.94 23.21 9013.80 8956.70 1225.45 3980.84 5975133.75 655914.82 515.57 15.21
11029.51 89.97 18.20 9013.83 8956.73 1262.91 3995.00 5975171.49 655928.22 550.00 12.51
11059.90 87.79 11 .45 9014.42 8957.32 1292.26 4002.77 5975200.99 655935.39 577.56 23.34
11092.20 91.69 5.15 9014.57 8957.47 1324.20 4007.43 5975233.02 655939.40 608.20 22.94
11124.62 86.78 3.19 9015.00 8957.90 1356.52 4009.79 5975265.38 655941 .10 639.62 16.31
Company: BPAmoco
Field: Prudhoe Bay
Site: PB F Pad
Well: F-04
Wellpath: F-04A
Survey
MD
ft
11154.66
11182.70
11206.00
lncl
deg
86.96
87.79
87.79
Azim
deg
1.32
358.97
358.97
)
)
BP
Baker Hughes INTEQ Survey Report
TVD
ft
9016.64
9017.93
9018.83
SSTVD
ft
8959.54
8960.83
8961.73
.'....."...,.,,,......'..'....................
I.N'[EQ
Date: 3/27/2003 Time: 16:15:16 Page: 2
Co..:ordinate(NE) Reference: Well: F-04,· True· North
Vertical (TVD}Reference: 4:04 2/2/1971 00:00 57.1
Sectit>n(VS) Reference: Well (0;00N,0.00E,350~00Azi)
Survey Calculation Method: Minimum Curvature Db: Oracle
N/S EIW MapN MapE VS DLS
ft ft ft ft ft degl100ft
1386.49 4010.97 5975295.36 655941.68 668.93 6.24
1414.50 4011.04 5975323.37 655941.18 696.50 8.88
1437.78 4010.62 5975346.63 655940.29 719.50 0.00
Parent Wellpath:
Tie on MD:
Rig:
Ref. Datum:
BP Amoco
LEGEND
F-04 (F-04)
F-Q4 (F-Q4APB 1)
F-Q4A
T
AM
,
4
DirEct: {BOli Ley -6613
Saker Hughes i~~~¡: f~ih~o¿g~~~~?q.[0m
Wellpath: (F-04/F-04A)
Azimuths to True North
Magnetic North: 25.96·
Magnetic Field
Strength: 57536nT
Dip Angle: 80.83·
Date: 1/9/2003
Model: BGGM2002
Created By: Brij Potnis
Date: 3/27/2003
~--: ~ ....
§-.-\,
fo\
~ ;~~;;;,~~~~
WELLPATH DETAILS
F-04A
500292008901
F-04APB1
10783.00
bp
Cnntact jr:f~f:"natiorL
~---~,--~-~~--
INTEQ
Nordic 1
4: 04 2/2/1971 00:00 57.1Oft
Starting
From TVD
V.Sectlon Origin Origin
Angle +N/-S +El-W
350.00· 0.00 0.00
0.00
REFERENCE INFORMATION
Co-ordinate (N/E¡ Reference: Well Centre: F-04, True North
Vertical ('NO Reference: System: Mean Sea Level
Section (VS Reference: Slot - 04 (O.OON,O.OOE)
Measured Depth Reference: 4: 042121197100:00 57.10
Calculation Method: Minimum Curvature
ANNOTATIONS
TVD MD Annotation
8971.20 10783.00 KOP
8961.75 1'206.00 TO
8780
8800
8820
8840
-
.58860
=
08880
N
-
.c 8900
..
a.
~ 8920
Q
i 8940
C,)
:e 8960
~
> 8980
~
29000
I-
:-------
--
9020
9040
9060
9080
o 20 40
1450
~'-,vv
; .
.
,-'
....
· .....
·
...... ....
·
....
.
.
.
.
.
.. ................m .'
.' .
!~~firl
·EJ-W Shape
OCOO 14.(622 31&043 Pd'¡p'I
000 31866 331810 Pdygo"I
000 15-C1!ó 3992.0 Pct¡gon
:m~ ,m~ ~mH ~
. .
'>
·
·
...... .
.
. '''''U
..
.
.
·
·
.... ... ......
.
I . ..... .
.; I
.. .... f I ..m'.
./ .
.
.
·
..;. , oJUU
·
·
·
......
. .
.. ''''''U ..
. è120O-: ·
. ~ .
~II"U .'
~ ;1100- . .
:mmm .....
~ ~ 105D-::
.. . . . . . . . --fKõPl.... . ... ....
100~. ........ . .. ....
95~ .... .' ........ ·...m .............. ..... ...
· ... .... ... . . 'mmm
::: ..... ..\ . ........ ... .... .......
800~ .'. . . · ..\. .' ·
, '.! .! .... ..... ....... ... ... ....m ..: .>. ..... . \.. .. '.. ...... .... m .............. ... .............. . ... .. .. ...... ......... ...
. . : . . ., ·e··.... . . . . .!." . ; ., '!" ,." . . . . . . ; . . . . . . . . . . .
3-<150 3~ 00 3550 3f:>0 3650 3700 3750 3800 3850 3900 4000 41 00 ~ 150 4< 00 4400 4450 4~ 00 4~ 50 4E DO 4650
·
..
.. '. ....
.
·
.
.
.
·
·
·
·
·
¡
·
I
.
.
.
.
· .
·
..
.. .
·
·
.'
. .
.. .......
· . ...
.,. ....m ..................
·
..... ..
. ..
.m........ ..... ..... ..
.
..m
....
.
.
.
-----
280 320 340 360 380 400 460
Vertical Section at 350.00° [20ft/in]
3/27/2003 -1 :-12 PM
)
)
II..
BADa
HUGHES
IN'TEQ
BP
Baker Hughes INTEQ Survey Report
Company: BP Amoco
Field: Prudhoe Bay
Site: PB F Pad
Well: F-04
WeUpath: F-04APB1
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Date: 3/27/2003 Time: 16:12:59 Page:
Co-ordinate(NE) Reference: Well: . F~04; True North
Verticat(TVD) Reference: 4: 042/2/197100:0057.1
Section (VS) Reference: Well (0;00N,O.00E,69~83Azi)
SurveyCalcubitiorl Method: MinimumCurvature Db: Oracle
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2002
Site: PB F Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5972527.29 ft
650960.70 ft
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 19 55.283 N
148 46 31.468 W
True
1.15 deg
Well: F-04 Slot Name: 04
F-04
Well Position: +N/-S 1280.42 ft Northing: 5973827.99 ft Latitude: 70 20 7.875 N
+E/-W 1025.27 ft Easting : 651959.92 ft Longitude: 148 46 1.527 W
Position Uncertainty: 0.00 ft
Wellpath: F-04APB1 Drilled From: F-04
500292008970 Tie-on Depth: 10010.00 ft
Current Datum: 4: 04 2/2/1971 00:00 Height 57.10 ft Above System Datum: Mean Sea Level
Magnetic Data: 3/5/2003 Declination: 25.90 deg
Field Strength: 57539 nT Mag Dip Angle: 80.84 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 69.83
Survey Program for Definitive Well path
Date: 3/5/2003 Validated: Yes Version: 3
Actual From To Survey Toolcode Tool Name
ft ft
100.00 10300.00 Gyro (0) GYD-GC-MS Gyrodata gyrocompassing m/s
10300.60 11226.00 MWD MWD MWD - Standard
Annotation
10010.00 8644.42 KOP
11226.00 9048.24 TD
Survey: MWD Start Date: 2/26/2003
Company: BakerHugheslNTEQ Engineer:
Tool: MWD,MWD - Standard Tied-to: From: Definitive Path
Survey
MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
10010.00 35.12 104.34 8644.42 8587.32 650.80 4070.66 5974561.09 656016.26 4045.37 0.00
10023.43 23.29 104.34 8656.12 8599.02 649.18 4077.00 5974559.59 656022.63 4050.76 88.12
10050.00 20.76 127.00 8680.80 8623.70 645.04 4085.87 5974555.63 656031.58 4057.65 33.15
10080.15 29.25 141.00 8708.12 8651.02 636.07 4094.80 5974546.85 656040.68 4062.94 34.15
10110.85 31.13 174.00 8734.84 8677.74 622.26 4100.38 5974533.15 656046.55 4063.42 53.82
10140.19 27.61 197.00 8760.48 8703.38 608.16 4099.18 5974519.04 656045.64 4057.44 40.03
10170.97 24.32 227.75 8788.28 8731.18 597.03 4092.37 5974507.77 656039.06 4047.20 44.53
10200.28 25.25 264.01 8815.04 8757.94 592.29 4081.63 5974502.81 656028.41 4035.48 51.24
10237.90 23.18 315.28 8849.72 8792.62 596.76 4068.30 5974507.01 656014.99 4024.51 54.57
10265.94 23.79 340.12 8875.50 8818.40 606.02 4062.48 5974516.16 656008.98 4022.24 35.13
10295.40 18.91 338.39 8902.93 8845.83 616.06 4058.69 5974526.11 656005.00 4022.15 16.70
10325.86 27.45 338.10 8930.90 8873.80 627.18 4054.25 5974537.14 656000.33 4021.82 28.04
) BP ) "..I..
ø
HIS
Baker Hughes INTEQ Survey Report IN'l'.ßQ
Company: BP Amoco Date: 3/27/2003 Time: 16:12:59 Page: 2
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-04, True North
Site: PB F Pad Vertical (TVD) Reference: 4: 042/2/1971 00:00 57.1
Well: .. ·F~04 Section (VS) Reference: Well (0.00N,O~00E,69.83Azi)
Wellpath: F-04APB1 Survey Calculation Method: Minimum. Curvature Db: Oracle
Survey
MD lncl Azim TVD SSTVD N/S E/W MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
10355.46 34.73 329.70 8956.24 8899.14 640.81 4047.44 5974550.63 655993.24 4020.13 28.58
10385.88 44.70 327.41 8979.62 8922.52 657.35 4037.28 5974566.96 655982.75 4016.29 33.12
10416.57 56.77 327.14 8999.00 8941.90 677.30 4024.45 5974586.64 655969.53 4011.13 39.33
10457.65 72.82 329.51 9016.44 8959.34 708.85 4005.04 5974617.79 655949.48 4003.80 39.41
10494.54 79.04 345.07 9025.46 8968.36 741 .76 3991.34 5974650.41 655935.12 4002.29 44.22
10527.60 89.82 347.58 9028.66 8971.56 773.68 3983.58 5974682.17 655926.72 4006.01 33.47
10562.55 90.12 343.04 9028.68 8971.58 807.48 3974.72 5974715.78 655917.17 4009.35 13.02
10593.95 89.48 346.79 9028.79 8971.69 837.79 3966.55 5974745.92 655908.39 4012.14 12.12
10630.36 89.54 349.31 9029.10 8972.00 873.41 3959.02 5974781.37 655900.13 4017.34 6.92
10660.03 89.75 350.76 9029.29 8972.19 902.63 3953.88 5974810.48 655894.41 4022.60 4.94
10705.41 90.43 353.46 9029.22 8972.12 947.58 3947.65 5974855.29 655887.27 4032.26 6.14
10736.50 90.43 355.36 9028.98 8971.88 978.52 3944.62 5974886.16 655883.62 4040.08 6.11
10790.03 91.44 357.00 9028.11 8971.01 1031.92 3941.06 5974939.47 655878.97 4055.15 3.60
10823.06 91.84 357.81 9027.16 8970.06 1064.90 3939.56 5974972.41 655876.81 4065.12 2.73
10853.35 90.55 2.80 9026.53 8969.43 1095.17 3939.72 5975002.68 655876.36 4075.72 17.01
10896.38 84.56 4.76 9028.37 8971.27 1138.05 3942.56 5975045.60 655878.32 4093.16 14.64
10928.92 85.12 8.53 9031.29 8974.19 1170.23 3946.31 5975077.85 655881 .41 4107.78 11.67
10961.52 87.67 11 .48 9033.34 8976.24 1202.27 3951.96 5975109.99 655886.42 4124.13 11.95
10990.98 87.51 14.89 9034.58 8977.48 1230.92 3958.67 5975138.78 655892.55 4140.32 11.58
11024.42 85.25 10.07 9036.70 8979.60 1263.49 3965.88 5975171.49 655899.10 4158.32 15.89
11 068. 15 83.02 359.52 9041 .18 8984.08 1306.78 3969.52 5975214.83 655901.86 4176.66 24.53
111 05.53 85.67 0.51 9044.86 8987.76 1343.97 3969.53 5975252.01 655901.11 4189.50 7.56
11165.38 89.63 6.28 9047.32 8990.22 1403.63 3973.07 5975311.73 655903.45 4213.40 11.68
11195.83 88.96 10.49 9047.69 8990.59 1433.74 3977.51 5975341.92 655907.27 4227.95 14.00
11226.00 88.96 10.49 9048.24 8991.14 1463.41 3983.01 5975371.69 655912.16 4243.33 0.00
LEGEND
F-04 (F-04)
F-04 (F-04APB1)
F-04A
T
AM
.
~
~:~!~~¡:{~~{~~X~@¡~~eq.(~m
Bai<er Hughes ¡NTEO~ {90!! 26ï-t",;€-DO
Wellpath: (F-04/F-04A)
Azimuths to True North
Magnetic North: 25.96°
Magnetic Field
Strength: 57536nT
Dip Angle: 80.83°
Date: 1/9/2003
Model: BGGM2002
Created By: Brij Potnis
Date: 3/27/2003
BP Amoco
Parent Wellpath:
Tie on MD:
WELLPATH DETAILS
F-04A
500292008901
F-04APB1
10783.00
-j; .,
\.
\.:
.,\:
..... '(:...,
"i;i~;;;;~"/
C{;n~act ;r:1çnTi3tior:.
.~.-----~~~..
INTEl¿
Nordic 1
4: 04 2/2/197100:00 57.1Oft
Starting
From TVD
REFERENCE INFORMA nON
0.00
ANNOTATIONS
TVD MD Annotation
8971.20 '0783.00 KOP
8961.75 11206.00 TO
8780
8800
8820
8840
-
.58860
=
~ 8880
-
.c 8900
...
a.
G) 8920
Q
i 8940
(J
:e 8960
G)
> 8980
G)
ë 9000
...
.~
.--....-----
Rig:
Ref. Datum:
V.Sectlon Origin Origin
Angle +N/-S +'E./-W
350.00° 0.00 0.00
Co-ordinate (N/E¡ Reference: Well Centre: F-D4, True North
Vertical (TVD Reference: System: Mean Sea Level
Section (VS Reference: Slot - 04 (O.OON,O.OOE)
Measured Depth Reference: 4: 042/2/197100:00 57.10
Calculation Method: Minimum Curvature
9020
9040
9060
9080
o 20 40 60
¡~f~'
'E/>N ~
000 1U622 31í)IJU Pc:i't<Pn
GOO 31666 3.37810 Pdyg:¡n
060 1501155 3992.t) ~
~~ Jn~ ~mH ~
~
3650 3700 3750 3800 3a"50 3900 4000
West(-)/East(+) [50ft/in]
.~
320 340 360 380 460
Vertical Section at 350.00° [20ft/in]
3/27/2003 I :'12 PM
~1f~íSŒ
~',~[
I.! .!\ 'r'
, I I '
U¿) L
)
!Æ~!Æ~~~!Æ
)
A.I,A.~KA. OIL AND GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7fH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Ted Stagg
CT Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re: Prudhoe Bay UnitF-04A
BP Exploration (Alaska), Inc.
Permit No: 202-100 (revised)
Sur Loc: 2972' NSL, 2884' EWL, Sec. 02, TIIN, RI3E, UM
Btmhole Loc. 1531' NSL, 999' EWL, Sec. 01, TIIN, RI3E,UM
Dear Mr. Stagg:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional peimits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required pennitting detenninations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be· given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
~ð'-~
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this 2f''''day of January, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
j¡.4 GA- i /2610 '5
12. Distance to nearest property line 13. Distance to nearest well "
ADL 028277,1531' MD No Close Approach /
16. To be completed for deviated wells
Kick Off Depth 10010' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casino WeiQht Grade CouDlino
2-3/811 4.6# L-80 ST-L
Hole
311
..', STATE OF ALASKA
ALAS~,· )OIL AND GAS CONSERVATION COh" )ISSION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
o Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
KBE = 57.1' Prudhoe Bay Field / Prudhoe
6. Property Designation Bay Pool
ADL 028280
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
F-04A /
9. Approximate spud date
02/07/03 / Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 11300' MD / 8971' TVDss
17. Anticipated pressure {s~ 20 AAC 25.035 (e) (2)}
90 0 Maximum surface 2216 psig, At total depth (TVD) 8800' / 3272 psig
Setting Depth
Top Botom Quantitv of Cement
Length MD TVD MD TVD (include staae d~ta)
2740' 8560' 7398' 11300' 8971' 64 sx Class 'G' /'
I
/'
Revised: 01/27/03
1 a. Type of work 0 Drill II Redrill
ORe-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface x = 651960, Y = 5973828
/'2972' SNL, 2884' WEL, SEC. 02, T11 N, R13E, UM
/At top of productive interval x = 655961, Y = 5974574
23081 SNL, 1132' EWL, SEC. 01, T11 N, R13E, UM
At total depth x = 655811, Y = 5975348
1531' SNL, 999' EWL, SEC. 01, T11N, R13E, UM
11. Type Bond (See 20 AAC 25.025)
Number 2S 100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
1 0676 feet
9204 feet
1 0561 feet
9105 feet
Length
Plugs (measured)
Top of Cement Cap at 10080 (05/02)
Top of Sand Plug at 10300 (05/02)
IBP Packer rubbers and bands at 10561'
Junk (measured)
Size
Cemented
MD TVD
96' 96'
2004' 2004'
9312'
10665'
Structural
Conductor
Surface
Intermediate
Production
Liner
96'
2004'
9312'
3011 Cemented
18-5/8" 9200 sx Permafrost II
13-3/811 x 9-51811 2410 sx Class 'G', 1775 sx PF II
10665'
9-5/811 X 711 460 sx Class 'G' (Uner Tie Back 10 Surface)
RECEIV'ED
Below Sand and Cement Cap: (Not Sqzd) 10394' - 10404', 10440' - 10490'
Sqzd Intervals: 10193' - 10490' , , i\ 'J 2 7 20 n '-~
true vertical Below Sand and Cement Cap: (Not Sqzd) 8963' - 8972', 9002' - 9045',.-1/-\\, . ¡ Vv'
Sqzd Intervals: 8795' - 9045' æJ R, ,.... ,., '-,n " I',..;..· "'swn
20. Attachments II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter~ti!ffi II Dritt~1þ1ç~' ~"...H~:'
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report II 2m~WS:Ð~0 Requirements
Contact Engineer Name/Number. Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubb/e, 564-4628
210. ~~:~::y C:~i;œ:aij~e and correct t:,::;=~~~;n.~;:,.., "<. .. ~::~,[~~3
Permit Number API Number APP~crÆ~D8:~e See cover letter
202-100 50- 029-20089-01 'I :f..)] 10. J for other reQuirements
Conditions of Approval: Samples Required 0 Yes 181 No Mud Log Requi~d 0 Yes EI No
Hydrogen Sulfide Measures I&J Yes 0 No Directional Survey Required ŒI Yes 0 No
Required Wor~ing Pr~ssLJre for BOPE P 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: T~* -gorE to -;500 f's, .
ORIGINAL SIGNED BY
MI Rill
Perforation depth: measured
.Approved By
Form 10-401 Rev. 12-01-85
Commissioner
by order of
the commission
1
Date
L I
î ~1>¡ y tJ :J
s bmit~~ Triplicate
l l, '." \, 1_....
)
)
BP
F-04a CTD Sidetrack
/
BackQround:
Nordic 1 CTD rig moved onto F-04 on 5/18/02 under Permit No. 202-100. Before even starting to mill the
window we twisted off a motor shaft leaving a fish in the well. When Nordic 1 was unable to recover the fish
the rig was moved off and service coil tried fishing. Those attempts failed also. /
Summary of Operations:
To resume operations on F-04a we are planning to lay additional 17 ppg cement to cover the fish and
provide for a cement ramp kick off in Zone 4. While the target interval remains the same as originally
permitted, the kick off point will be higher. The new directional plan is attached. V"
One fault, 15-25 ft throw, will be crossed in the horizontal section of F-04a. This fault orientation and throw
suggest a minimal risk of lost circulation but may present a geosteering challenge in re-Iocating Zone 1 B on
the far side of the fault. /"j
Phase 1: Prep work. Planned for F/~.r2603. "'.....".'."....)
1. Service coil to lay 17 ppg ~~nt from 10,090' to approx. 9960' toyovide for a geme~t,.../'
whipstock. A minimum of 8 bbls of 17 ppg cement will be used. l...,-----
Phase 2: Mill window, Drill and Complete sidetrack: Planned for Feb. 7, 2003./
Drilling coil will be used to mill the window at 10,010' MD (8587ss)from a cement ramp then drill and
complete the directional hole as per attached plan. Maximum hole angle will be 90 degrees.
~
Mud Program:
· Phase 1: Seawater /....)
· Phase 2: Mill with seawater/biozan, drill with Flo-Pro (8.~r1pg)
Disposal:
· All drilling and completion fluids and all other Class" wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program: /
The production liner y¡iH 23/8" ST-L from TD to approx. 8560'MD (7398 'ss). The liner will be cemented
with a minimum 0:..13 bb to bring cement up to approx. 9,800' (8416ss) or about 210ft above the window.
Well Control:
· BOP diagram is attached.
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. /'
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan. Max. planned hole angle is 91 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
/'
Logging
· MWD Gamma Ray will be run in the open hole section. Memory CNL will be run inside the liner.
Hazards
· The maximum recorded H2S on F Pad is 30 ppm on well F-43.
· Zones 3 and 2 conglomerates may cause slow ROP, possible bit damage.
· One small fault mid-polygon may cause lost circulation.
Reservoir Pressure
Res. press. is estimated to be 3272 psi at 8800'ss (7.2 ppg emw). Max. surface pressure with gas (0.12
psi/ft) to surface is 2216 psi. /
/
TREE = \
WELLHEAD =
ACïÜð,-rOR ;,
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
DatumlVD=
6"CrN
McEVOY
OTIS
57.07'
39'.17ï
3000'
4~~.~~~~η
10303'
··ssöÖ'SS
, F-04A )
) ,
Proposed CTD Sidetrack Revised Jan. 6, 2003
14-1/2" TBG-IPC, 12.6#, L-80, ID = 3.958" l-i
19-5/8" CSG, 47#, NSCC, ID = 8.681" l-i
113-3/8" CSG, 72#, N-80, ID = 12.347" l-i
48
1901'
1965'
2000'
2022'
K
~
I 1 1965'
.....--t 2000'
"--1 2022'
ST MD
7 3715
-.! 6 5006
5 5887
4 6543
3 6891
2 7204
1 7326
SAFETY NOTES: COMMUNICATION IN 18-5/8" x 13-3/8"
ANNULUS (FILLED WITH CRUDE) NO LATCH ON VALVE
AT GLM #3.
1 Top of 2-3/8" liner l-i
13-1/2" TBG. 9.3#, L-80, ID = 2.992" l-i
17" TBG, 26#, L-80, ID = 6.276" l-i
1 TOP OF 7" LNR l-i
II
1
Z'--
8492'
8560'
8583'
,g
8
8542'
8583'
8642' , l
8642' I
i
f--i
8641' 1-i9-5/8" TrN SN-6 PKR 1
19-5/8" CSG, 47#, N-80, ID = 8.681" l-i 9312' µ
PERFORA TION SUMMARY
REF LOG: SWS BHCS (RUN2A) ON 03/14/71
ANGLE AT TOP PERF: 34 @ 10193'
Note: Refer to A'oduction DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
4" 4 10193-10221 cmt'ed 07/25/98
4" 4 10261-10296 cmt'ed 07/25/98
4" 4 10310-10325 cmt'ed 07/25/98
4" 4 10332-10374 cmt'ed 07/25/98
4" 4 10386-10404 cmt'ed 07/25/98
2-1/2" 6 10394-10404 cmt'ed 03/16/02
2-1/8" 6 10415-10430 cmt'ed 07/25/98
2-1/8" 4 10430-10454 cmt'ed 07/25/98
2-1/8" 4 10440-10490 cmt'ed 08/06/98
2-1/8" 6 10454-10479 cmt'ed 07/25/98
2-1/8" 4 10479-10490 cmt'ed 07/25/98
DATE
06/26f76
OS/26/87
02108/01
07/17/01
03/16/02
1-i4-1/2" OTIS -XLB SSSV LAND NIP, ID = 3.813"
1-i4-1/2" x 3-1/2" XO 1
l-i 9-5/8" x 7" XO 1
l-i 13-3/8" x 9-518" XOI
GAS LIFT MANDRB.S
lVD DEV TYPE VLV LATCH PORT
3599 30 FMH-O BK-2
4598 47 FMH-O BK-2
5275 49 FMH-O BK-2
5781 48 FMH-O BK-2
6048 45 FMH-O BK-2
6289 48 FMH-O BK-2
6383 49 FMH-O BK-2
1-i3-1/2" OTIS XA SLIDING SLV, ID = 2.75" I
DATE
- 7" Otis PKR w 1 X(HCL), ID=2.75"
(milled to 2.74" ID)
- ;J-1f¿" x ;¿:-(/'ö" xu
(milled)
..
/9800 proposed top of liner cement ./
...---- 9960' proposed top of 17 ppg cement
10,010' 1 ./
"¡~~::p
2-3/8" cmt'ed and perted l-i 11300'
10460'1 I-iTailpipe nilled off and dropped I
1 PBTD l-i 10561'
10561' l-i IBP PKR RUBBERS & BANDS I
I 7" LNR, 29#, N-80, ID = 6.184" l-i 10665'
REV BY COMMENTS
ORIGINAL COMR..ETION
LAST WORKOVER
SIS-MH CONVERTED TO CANVAS
RNITP CORRECTIONS
CWS/tlh ADD PERFS
DATE REV BY
COMMENTS
FRUDHOE BAY UNIT'
WELL: F-04
PERMIT' No: 71-0020
API No: 50-029-20089-00
Sec. 2, T11N, R13E
BP Exploration (Alas ka)
TREE = ,
WELLHEAD =
.ACTUA TOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum lVD =
6"CrN
McEVOY
OTIS
57.07'
39.17'
3000'
40 @ 3900'
10303'
8800' SS
) F-04A )
Proposed Prep for CTO Sidetrack revised 1/06/03
e
1965' C
K
2000'
2022' ~
L
-
14-1/2" TBG-IPC, 12.6#, L-80, ID = 3.958" 1-1
19-5/8" CSG, 47#, NSCC, ID = 8.681" 1-1
113-3/8" CSG, 72#, N-80, ID = 12.347" 1-1
SAFETY NOTES: COMMUNICATION IN 18-5/8" x 13-3/8"
ANNULUS (FILLED WITH CRUDE) NO LATCH ON VALVE
ATGLM#3.
17" TBG, 26#. L-80, ID = 6.276" 1--1
1 TOP OF 7" LNR 1-1
8642' ,I
8642' 1
19-5/8" CSG. 47#, N-80, ID = 8.681" 1--1 9312' µ
ÆRFORA TION SUMMARY
REF LOG: SWS BHCS (RUN2A) ON 03/14/71
ANGLEATTOPÆRF: 34 @ 10193'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV A L Opn/Sqz DA TE
4" 4 10193-10221 cmt'ed 07/25/98
4" 4 10261-10296 cmt'ed 07/25/98
4" 4 10310-10325 cmt'ed 07/25/98
4" 4 10332-10374 cmt'ed 07/25/98
4" 4 10386-10404 cmt'ed 07/25/98
2-1/2" 6 10394-10404 cmt'ed 03/16/02
2-1/8" 6 10415-10430 cmt'ed 07/25/98
2-1/8" 4 10430-10454 cmt'ed 07/25/98
2-1/8" 4 10440-10490 cmt'ed 08/06/98
2-1/8" 6 10454-10479 cmt'ed 07/25/98
2-1/8" 4 10479-10490 cmt'ed 07/25/98
I PBTD 1-1 10561'
I 7" LNR, 29#, N-80, ID = 6.184" I-{ 10665'
DATE REV BY COMMENTS DATE REV BY
06/26/76 ORIGINA L COMPlETION
OS/26/87 LAST WORKOVER
02/08/01 SIS-MH CONVERTED TO CANVAS
07/17/01 RNlTP CORRECTIONS
03/16/02 CWS/tlh ADD ÆRFS
I
I
/--1
""-1
II -
ST MD
7 3715
6 5006
5 5887
4 6543
3 6891
2 7204
1 7326
I 8492'
1
~
x-
8542'
1901'
1-14-1/2" OTIS -XLB SSSV LAND NIP, ID = 3.813"
1965'
2000'
2022'
1-14-1/2" x 3-1/2" XO I
1--19-5/8" x 7" XO I
1-113-3/8" x 9-5/8" XOI
GAS LIFT MANDRELS
lVD DEV ìYÆ VLV LATCH
3599 30 FMH-O BK-2
4598 47 FMH-O BK-2
5275 49 FMH-O BK-2
5781 48 FMH-O BK-2
6048 45 FMH-O BK-2
6289 48 FMH-O BK-2
6383 49 FMH-O BK-2
1-13-1/2" OTIS XA SLIDING SLV, ID = 2.75" I
- 7" Otis PKR w / X(HCL) 2.313. X Nipple I
milled out to 2.74"
PORT
DATE
____ 3 1/2" X 27/8" XO milled out to 2.74" and
jet cut at 8561 ELMD, 8584 tally depth
g
~
f-1
8641' 1--1 9-5/8" TrN SN-6 PKR I
.
._1 9876' 1-1 MARKER JOINT I
X X X : --9960' target top for new 17 ppg cmt.
X X x:
- 10,080' approx current top of cement /"
~~ 10,396' HTailpipe rrilled off and dropped I
, Placed carbolite from PBTO to 10,305' then
17 ppg from 10,305 to 10,080 for window /'
. - Last TO tag @ 10,510' (5/1/01) ,/
I 10561' 1--1 IBP PKR RUBBERS & BANDS I
COMMENTS
PRUDHOE BAY UNIT
WELL: F-04
ÆRMIT No: 71-0020
API No: 50-029-20089-00
Sec.2,T11N,R13E
BP Exploration (Alaska)
Plan: Plan #10.1 (F-04/p1an#10.1 F-04A)
Created By: Bnj Potnis Date: 1191:
Contact Information'
Direct (907) 250-0132
E-mail: PotnisBP@BP.com
Baker Hughes INTEQ: (907) 267-66QO
-.---
Magnetic Field
Strength: 57536nT
Dip Angle: 80.83·
Date: 119/2003
Model: BGGM2002
T Azimuths to True North
^ M Magnetic North: 25.96·
f
é
LEGEND
F-04 (F-04)
Pfan#1 0.1 F-04A
Plan #10.1
'-...:" ....:
_.-
RADII
HUGHES
h'iTEQ
ObP
i
BP Amoco
WlLL'ATH DnAlL8
,.....to.t ,-4141I
_lOt
.004
100tO.00
"onIIa 1
4.04 2I2Itl7t 00:00 57.1Oft
o~ ~m; :=~
0.00 0.00 0.00
,_ WellpMh:
TIe _ liD:
ItIF
It.,. Datum:
Y.8eotlon
AnsIe
350.00'
-
c
i 1200-=-
o
N
-
-
+
:ë1OOO--
1::
o
z
-
'7'" 800- --
-
.c
..
~
o -.. ~_.
en 6OO-~.- ---
F-04A Fault 2
1800
1400-
1600
T.....
......
......
....1.
....0.
·70.17
10'....
.....
...so
.n A'
745.75
Co-((dinate ~! Reference: Well Centre: F-04. True North
vr~ (V~ ~::::~: ~~~ ~~r.~)1
Measured Depth Reference: 4: 04 2/2/197100:00 57.10
Calculation Method: Mininum Curvature
aECTION HTAlLa
he MD ,., Ad TYD +MJ.a +EI.w D~ Trace
i iæi: S:ii iitl! lliHi =r. =~ vJi Utl:
~ ,_ MAr ,_ _'M _.n _2.41 30.10 110.00
I 101$4..01 I'''' 11'.72 "'1.21 IU.I' .101.17 H.IO 110.00
· 101f'.7. 10.00 311.00 ....M ...... 'IHM HoG ,....07
, 10....11 n... _.00 ._.12 ''''.10 'H4.11 30.10 ".00
· 1011'''' UAI ".&0 ...,.., 1071.04 1t02.17 12.00 ".00
· 11:1100.00 ".00 SU.l3 It70A' .........70 IN..... 12.00 ....10
TARGET DETMS
1W ..~ +£I·W ShIipe
8&5 'mfi ~1~ =:
000 1stl55 3W2A3 PI;:ItJ9Oft
~~ ~~n~ :~¡~ ~
~7000 1,&.c2¡a 3920A1 Pof1t
....
~5e-r'
F.Q.IA hut 3
F.(WA no.'
F-OtA Tt02
ANNOTATIONS
TYD IID__
.571.14t_.00 ~
.587.3110010.00 KOP
._.,.,0024.00 3
1807.N 10034.00 4
"'7.29 10134.00 .
.....10 t05tl.75 .
._.12 t05l8.., 7
.1183.13 1ott...' .
.170.85 11_.00 TO
400---
200---- .
2800
3000 3200 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200
West( -)/East( +) [200ft/in]
F-04A T10.2
I
:]Jo· I
- /
f
/
¡
!
í
1\ .~
! ~,
í
8400
'ë 8500,
~
o
'I'" 8600
-
.c
..
a.
II
a 8700
'i
u
:e 8800
~
II
2
I- 8900
- - - -------
900 1000 1100 1200 1300 1400
1/9/2003 3:56 PM
300 400 500 600 700 800
Vertical Section at 350.00° [100ft/in]
200
100
F-04A T10.
o
i
I
/
J::-F--O,t{F__~ -
-200 -100
-300
-400
9000
bp
) BP)
baker Hughes INTEQ Planning keport
H._.h_ ."____..._.. ..........____ ____~__.
.-.'.
-.a..
[NT EQ
_.._ .______. _ _"_.__ ___ ___.___. _n_____. .._._ __u_ _ _ ...._.. ..... __ _ _~..__ _ .___ __.. ._~. ___,_.~ ...._ _ r" _" ._ ,__ __.. _._._ ... _ .~.. ____.___ ...w·_.....__,.,__....·.._..,.....
BP Amoco Date: 1/9/2003 Time: 15:57:06 Page:
Prudhoe Bay Co~rdillate(N"E)Refel7ence: iWåll:,F-04, TrLle North'
pBFPadi ... .... ..... ... ..... .... ' . .. .......'........ ..........'.., ... ....... ...'.. . Vertical (~Vl)~efe~eJÏ~e::<iSY$t~rn:M~~nSf)atevel
F-04 .' ............. '... .' ..'<ii ... ..... ..... ....>,. ...... .... ,.' ....... .. ........... .... .. SectiolI,<YS)R~f~r~.nçe:i ......... ....... ..V\lell(O.OON,O.OOE,~&O.QO~i)
. :~~~~~:~;~.:.~~~~~:::":...:.::=:.:':::::;_:.:.:~:_:.::~:"::::.7:::=.:~:.:.:::=.::.:'::...::c.::::..::.~~::.:::~==~~~~~~~~~~~_~~::_~~~~~~~:.____~::~~~:~~~:~=~~:~~;:~~~:____,7_~::::~:~.~;:~:.~~~Clè
Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Company:
Field:
Site:
Well:
WelJpatb:
..'............ ",....-. .........--..
Field:
...__..~._. .. .'" ._......... .. _.,.~,.._..,..."_.,..,,... ....".,~.. ~ ''''n,.''"'· '... ~ ..__
PB F Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
Site:
Well: F-04
F-04
Well Position:
Position
+N/-S 1280.42 ft Northing:
+E/-W 1025.27 ft Easting:
0.00 ft
..., ".,.. ,..~,."-'" ."...-......-.. ._..~"'_.-
..." -"~..-,~.-..",.,.--,.,-~".,-.,,.-.
5972527.29 ft
650960.70 ft
5973827.99 ft
651959.92 ft
Map Zone: Alaska, Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2002
.. ._,_ ,.,__.".._......~ ..H_..... ... _...,. "''''~'''''_' ...."......,..'. ,_"._ ......,..._,.__ __. ..__~..,,"....._..
.' ....,'., ..'n......_".,...~.....__...._,.__., ..__._,~_"_._.."_,_,_"".,,_,.·.w,..._..,,_._,,..,,.._.,_,,_. . . '·"H·m.. _.._..._,..,..,.,.~.".__
_On. .__,..,._~_.,',..._
"_.. ..."...n....__.______........,__...._..._._,......___..__..n_," ._.,__~, _~__,,__...._,_.."~.__.._..._._,.. .. . '''._,.~,.._"_.......,,_.. '.
Well path: Plan#10.1 F-04A
500292008901
Current Datum: 4 : 04 2/2/1971 00:00
Magnetic Data: 1/9/2003
Field Strength: 57536 nT
Vertical Section: Depth From (TVD)
ft
0.00
... ".--.. -"...._"._.-....~ ,--.... ._-" .-.~"-,-'.
Targets
Height 57.10 ft
+N/-S
ft
0.00
._, , ,._,,-,~....---,..... .".._.,,~.., -." --....,-....". "-'-""""'--'~'''''--
Latitude:
Longitude:
North Reference:
Grid Convergence:
70 19 55.283 N
148 46 31.468 W
True
1.15 deg
Slot Name:
04
70 20
148 46
7.875 N
1.527 W
- ' --,-,-,.""_.,_._-.-..,, -_...-- ... .... ..- .......'-"-...,,_.._,..._,_..~.._,,. .-,.-....-
.. '.. .R_"._'."._.'R...... .. .~,..,.,_..._.,,,._ .__,~._~~ .~_.."~_,,,._. _._,.."..,"~"___". .."'....,_.~.._..~...._._,_ ....,~_.._....__._,...____._..__._,.,.,'_..._
5974275.00 655330.00
5974275.00 655330.00
5975080.06 655734.89
5975450.00 655920.00
5975450.00 655920.00
5974850.10 656640.08
5974600.00 656190.00
5974600.00 656190.00
5975080.03 656424.94
5974630.00 655950.00
5975350.00 655850.00
F-04
10010.00 ft
Mean Sea Level
25.96 deg
80.83 deg
Direction
350.00
70 20 11.592 N
70 20 11.592 N
70 20 19.426 N
70 20 23.026 N
70 20 23.026 N
70 20 16.979 N
70 20 14.612 N
70 20 14.612 N
70 20 19.284 N
70 20 14.956 N
70 20 22.057 N
.. ._.~.._"~"_....,.....,,_..,-'...""~.,-~,-......_.._,~-,,.,....-, '-",.'~'."~_'''_' .~... . .,'... ~'''''''',-.'- --_._.~ '""-,..~. 'f"'"'-'~.'--"-'":"' ..".,--:'-."-_._..~.."_._~.,"~.."...,~..". ,--..,.-...,... .~..'""_..~._,.."",.._.....__...-_......._,_.""~.._._,...........---_.._._-. ._....._.,-...~...._~-~-'_.~......_."'_...~-'':'"'"-,...,'-.-_."._-'~.~' .._-_._-:-~~"....,._-,--,..-..._".~. ,..... -. .
Latitude:
Longitude:
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
M~p . '.. ..... Map> ..... ~....-. I.at~tude;~i.<·+i...()~gitu~~....->
. ~~;;;...____..:._:.._~=~:~~~.....:;;.."..:..._:~~~:..,. .....~~.~:!!~~~~.~",.:..:.:~:~:::.~..,.;_.,....~:~.~~~~..._.~.~.e~.~.__....._.:_;~:~:.~·~::.,...:_s.e~...,...... ......
0.00 1446.22 3760.43 5975350.00 655690.00 70 20 22.090 N 148 44 11.688 W
0.00 1446.22 3760.43 5975350.00 655690.00 70 20 22.090 N 148 44 11.688 W
0.00 1470.98 4021.00 5975380.03 655950.00 70 20 22.332 N 148 44 4.077 W
0.00 733.16 4151.19 5974645.06 656095.10 70 20 15.075 N 148 44 0.286 W
0.00 525.94 4507.12 5974445.11 656455.13 70 20 13.035 N 148 43 49.894 W
0.00 197.83 4160.42 5974110.06 656115.17 70 20 9.810 N 148 44 0.025 W
0.00 458.63 3875.59 5974365.02 655825.14 70 20 12.376 N 148 44 8.339 W
0.00 1044.46 3842.37 5974950.01 655780.06 70 20 18.138 N 148 44 9.301 W
8960.00
8970.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
378.66
378.66
1175.41
1541.55
1541.55
927.14
686.19
686.19
1161.40
..". ...._.___u,._ """'_'~" ......_._.
Name Ö~¿~ip~i()~
. ..._:,......,_'.."9.!.~:.^..:.:~ ".'...i.._.~.iE~_..,.~_._
F-04A Polygon5.1
-Polygon 1
-Polygon 2
-Polygon 3
-Polygon 4
-Polygon 5
-Polygon 6
-Polygon 7
F-04A Fault 1
-Polygon 1
-Polygon 2
F-04A Fault 2
-Polygon 1
-Polygon 2
F-04A Fault 3
-Polygon 1
-Polygon 2
F-04A T1 0.1
F-04A T1 0.2
721.05
1442.98
3378.70
3378.70
3799.85
3992.43
3992.43
4700.26
4245.17
4245.17
4489.80
4005.81
3920.41
148 44 22.852 W
148 44 22.852 W
148 44 10.541 W
148 44 4.910 W
148 44 4.910 W
148 43 44.246 W
148 43 57.542 W
148 43 57.542 W
148 43 50.389 W
148 44 4.532 W
148 44 7.015 W
bp
. BP )
bJker Hughes INTEQ Planning Report
...
....
1:~l""rEQ
_.~.....~,.,.~,.__.~.~.__.__.,~"... ....__..._,..._",_._,_..w..~_~....:_..........,....,_~.,____.".._.. ...~,___._.._'..."...._..._'._.....__,__....-_ ..,.........--..-.....-,...........-........-..--.....-....-..--'.-.-....-........_......-.
..~_..,"..,,'.,..,.,,_..-.,'_.'~.,_._.
. . ._., "".. _''-'" ."."."...,~ ."............_'_....,."...,," -"..._- ,_.... ...:"""__....'-:-.:'".,.,,~_'_...~..._.'""_... ''''''''1' '"[""'..-......."';"......'... -:-'''-,.,,,.'.,,.... '··"·w .--.....,'~....
Date: ,'1/9/2093........ .. .... '.. .......... .·...·,.·'firn¢;: ..·.t5:57:06 Page:
Co~rdi~at~(NE)R~fere~ce:Wen: F-04,TrueNprt~ ..'
yel'*~'(Tvn)Rêf~~e..ce: $yst(:)rn: Mean SeaLevel
"Seçtio,n(YS) Refer~Dc~: ..,..... .... ..,"V~H(0·.00N,0.OOE.350;OOAzi)
.,.-".;....;~_'-'..... ;,_,.__",.,_"..,;__~~~!~;S.,~~~~I;~~~~_~~t_~,~.~:_--:..__.,~~~!~~~E~.~~~t~!.l:,c.~__,_;.-'_,J?~.:_._.<'.~~~':!... ...
Company: BPAmoco
Field: Prud~o~Bay
Site: PB FPad
Well: F-04'
..~!~~~tt!~~..._~_I~~~.~~:!..~~~.~_..___.._..,'~......_..._....."_._
Annotation
2
ft
10000.00
10010.00
10024.00
10034.00
10134.00
10519.75
10588.61
10918.61
11300.00
8579.14
8587.32
8599.15
8607.98
8697.29
8959.90
8960.12
8963.93
8970.65
TIP
KOP
3
4
5
6
7
8
TO
Plan: Plan #10.1
KO moved higher to increase stand off from 23
Principal: Yes
Date Composed:
Version:
Tied-to:
1/9/2003
1
From: Definitive Path
Plan Section Information
" . ___" , ~" .. "~'~""":, "~i"" ~.:--' "..~......, .,.....,~'"..:..~ :'-:'.... ..,.~.,..... .':-...:~' .'7-:""":"':' "~' "7':":" ",~"'_:."""c_-: .. '-:"_",~' ..- ," ..~_"...':".._',.._,.".. '_','~:_ ,;-_."r'_r' .._,.~.....~.._ ....,... ~'" ..--:-"--:: ',".~""-_''':''''_''' ~.~~-_..._~. __,. .:~- ::':""."'~. .;'"._~." ...,,~, ""':."". ....,.,':"""-, ·,,·,,~.,··':"":''"..·_-,-.."ë..~·'--:M_:. .";',..~-,~~..."~-",,, --"" ~~,,~ ~".,-. ~:"~_._" .,"'~-- '-'.""~"-'-.~--" - "'."0:-""-'" 'h' ". _.. ,"'._" ...-...,.".. ,~, ... .-'. ""
MD Inçl . Azina 'TV» '-I-:N/"S +EI;':W ·DLS ,. Build Tûrn TFÚ 1'ar~et'
_................"~_.......__....._~:~~_.. _:__....:_~e.~__.~__:...:._;~_:._'''''_.~._..,_._~.....".:.__..._,..~.,~~..::.;.,_...:.,-'"._~..:",.-'~.:.,;-:.:.;.......:.~~;~~!J.P2!!~~~.g!!9_~.~~~.~BP~.;.:.L.._~~~_.._..."._.__:..........._..:....::..c..;,:.;... ,.......".....,.......-...
10000.00 35.18 104.33 8579.14 652.23 4065.08 0.00 0.00 0.00 0.00
10010.00 35.12 104.34 8587.32 650.80 4070.66 0.60 -0.60 0.10 174.52
10024.00 29.52 104.34 8599.15 648.95 4077.91 40.00 -40.00 0.00 180.00
10034.00 26.47 104.34 8607.98 647.79 4082.46 30.50 -30.50 0.00 180.00
10134.00 31.93 168.72 8697.29 615.57 4109.87 30.50 5.46 64.38 110.00
10519.75 90,00 319.00 8959.90 688.59 3938.86 30.42 15.05 38.96 146.07
10588.61 89.64 340.00 8960.12 747.60 3904.11 30.50 -0.52 30.50 91.00
10918.61 89.09 19.60 8963.93 1071.04 3902.97 12.00 -0.17 12.00 91.00
11300.00 89.00 333.83 8970.65 1441.70 3881.68 12.00 -0.02 -12.00 -90.50
Survey
MD
ft
10000.00
10010.00
10024.00
10025.00
10034.00
_.'. _n.. _ ..... ...
__.. _.. . .___ _~. _, _"-:' _, .~,..~.._,...'" "_..._~._.._..~ .... ~_..," _ .'c" .._."'_ '''.:.''~_''~"...".,~"._. ,..': .....~."_'_"~u..._~....,__.._._.~.:-:-_..;~..,_. ._.~-'_....-_._._.-:- _.._.".~'-,...."..~--,.,.~.""-,-,..
..-. --<" --' --.-."...~-...... ,,~..~. ...-." -,',,' .", "."....." ,,~. -. . ~ "". .
Incl Azim
.~:~......._._-_......~~~.;_..-
35.18 104.33
35.12 104.34
29.52 104.34
29.21 104.34
26.47 104.34
SSTVD N/S EIW MapN'MapE VS DLS TFO Tool
ft ft ft iff.. . ft ....... .... ft .. degl100ftdeg
...... '" _ ","'~, ;.. ",.. ,.~;, .." ""...:'..~.. ,,,.~ ",. ,,,_,_. ._'." "..'.,~_. '""".., J.. ._._...;,.~"~"..: "...~¡ .,_ .._:. ...__ _ "._.,,,___.._' ~""."". :_..... .. ".:...,..;,... __'~'" .... _ ...._'"".. ~._ _'.. ~~. ~.._._.,~ ,~.._..__, ,.~._.' ,-~~ .-.-.,.. .,1.... '...~ ......, -..'....."'-.....--'- :.~ .-.-...'. ,_.~ ....,..,_. ;,,- .._....;'-....'...........;..'-~....;~.... _...... ..',,',.. ..'_.....,.... '.
8579.14 652.23 4065.08 5974562.40 656010.65 -63.58 0.00 0.00 TIP
8587.32 650.80 4070.66 5974561.09 656016.26 -65.95 0.60 174.52 KOP
8599.15 648.95 4077.91 5974559.38 656023.54 -69.03 40.00 180.00 3
8600.02 648.83 4078.39 5974559.27 656024.02 -69.24 30.50 180.00 MWD
8607.98 647.79 4082.46 5974558.31 656028.11 -70.97 30.50 180.00 4
10050.00 25.19 115.16 8622.38 645.45 4089.00 5974556.11 656034.70 -74.40 30.50 110.00 MWD
10075.00 24.91 133.22 8645.07 639.58 4097.67 5974550.41 656043.48 -81.69 30.50 100.25 MWD
10100.00 26.75 150.26 8667.60 631.07 4104.30 5974542.04 656050.29 -91.22 30.50 83.87 MWD
10125.00 30.33 164.42 8689.58 620.09 4108.80 5974531.16 656055.01 -102.82 30.50 68.51 MWD
10134.00 31.93 168.72 8697.29 615.57 4109.87 5974526.66 656056.17 -107.46 30.50 56.05 5
10150.00 28.01 174.51 8711.15 607.67 4111.06 5974518.79 656057.52 -115.44 30.42 146.07 MWD
10175.00 22.57 187.03 8733.76 597.05 4111.03 5974508.17 656057.71 -125.89 30.42 141.05 MWD
10200.00 18.60 205.64 8757.18 588.68 4108.72 5974499.76 656055.56 -133.73 30.42 129.71 MWD
10225.00 17.18 230.15 8781.01 582.71 4104.15 5974493.70 656051.12 -138.82 30.42 112.26 MWD
10250.00 18.87 254.30 8804.81 579.25 4097.42 5974490.10 656044.46 -141.06 30.42 88.90 MWD
10275.00 23.01 272.30 8828.18 578.35 4088.63 5974489.02 656035.69 -140.42 30.42 65.90 MWD
10300.00 28.54 284.38 8850.70 580.03 4077.95 5974490.48 656024.98 -136.91 30.42 49.06 MWD
10325.00 34.81 292.61 8871.98 584.26 4065.56 5974494.46 656012.50 -130.59 30.42 38.16 MWD
10350.00 41.48 298.54 8891.63 590.97 4051.67 5974500.89 655998.49 -121.57 30.42 31.14 MWD
10375.00 48.39 303.07 8909.32 600.04 4036.55 5974509.65 655983.18 -110.01 30.42 26.47 MWD
10400.00 55.44 306.71 8924.74 611.31 4020.44 5974520.59 655966.85 -96.12 30.42 23.26 MWD
10425.00 62.57 309.77 8937.61 624.58 4003.63 5974533.52 655949.78 -80.13 30.42 21.01 MWD
10450.00 69.77 312.46 8947.70 639.62 3986.43 5974548.20 655932.28 -62.33 30.42 19.43 MWD
10475.00 77.00 314.91 8954.84 656.16 3969.12 5974564.39 655914.64 -43.04 30.42 18.34 MWD
10500.00 84.26 317.22 8958.91 673.92 3952.03 5974581.79 655897.19 -22.58 30.42 17.64 MWD
10519.75 90.00 319.00 8959.90 688.59 3938.86 5974596.20 655883.73 -5.84 30.42 17.26 6
10525.00 89.97 320.60 8959.90 692.60 3935.47 5974600.14 655880.26 -1.31 30.50 91.00 MWD
bp
_..._u _.~.,._. ._". ._._..... ........__..~.~_.__ _"_"_'_'___~'."____'_'"
, BP )
bJker Hughes INTEQ Planning képort
8A
~·'.I
IS
..-....~_._----:-..,... .--- ....:- -...-. .-.--,----..----:- - ~~-~.,......._._--;-._-- :--~ ._..,.._.~ ._~-_._.__...---:-_.-:--._-;-..._--.~-:"'----_.-.-. ---....;--- ~-_.._"....-._-. ..-. ~. -_..~.-._._-- -_...:~.,..__.- .----.- ._._....__..~ .""...",. .--...-
INTEQ
8960.19
8960.37
8960.57
8960.79
8961.03
8961.30
8961.58
8961.88
8962.20
8962.54
8962.89
8963.26
8963.64
8963.93
8964.04
8964.44
8964.86
8965.29
8965.72
8966.16
8966.60
8967.05
8967.51
8967.96
8968.41
8968.87
8969.32
8969.77
8970.21
8970.65
MD loel AziQ1 SSTVD N/S
... .~.........._.,.~..,.J..~_.~~~"... .~....L".'~~'..'_.'.".__."_"~.".."..,:.,,._._......,,.:_..,...~_,:;.......,......
10550.00 89.84 328.22 8959.94 712.92
10575.00 89.71 335.85 8960.04 734.99
10588.61 89.64 340.00 8960.12 747.60
89.62
89.57
89.52
89.47
89.42
89.37
89.33
89.29
89.25
89.21
89.17
89.14
89.11
89.09
89.08
89.06
89.03
89.01
89.00
88.98
88.97
88.97
88.96
88.96
88.96
88.96
88.97
88.98
88.99
89.00
341.37
344.37
347.37
350.37
353.37
356.36
359.36
2.36
5.36
8.36
11.36
14.36
17.37
19.60
18.83
15.83
12.83
9.83
6.83
3.83
0.83
357.83
354.83
351.83
348.83
345.83
342.83
339.83
336.83
333.83
758.34
782.23
806.47
831.00
855.74
880.63
905.61
930.61
955.54
980.36
1004.98
1029.35
1053.39
1071.04
1077.07
1100.93
1125.15
1149.66
1174.38
1199.27
1224.24
1249.23
1274.18
1299.00
1323.64
1348.02
1372.09
1395.76
1418.99
1441.70
- ,.. _"..q.,.._....." ._'...._... ....__.u..__.
Company: BPAmoco Date:· .1~9/2003. ..... .... Time: 15:57,:06 Page: 3
Field: prqdl'1()eßaYCø~rdall~te(N:Jji)~~fer~oee: ··VV~II;F~O~,Tr4~ Nort~
Si.te: PB F·· PadYertiç.I'(T"\TD~~ef~~~~~~:· S~t~rn:. ty1ea~.Sea Level
Well: F-04.··.·, .......'...... ..... ... ~e~ti~n<YS)'R.~f~~en~e:.:· Well (Q.OON,0.00E,350,00ÄZi)
-_.! ~.~!~~~~c:....._~~~:~~,~_~:~.£~£1,~~;_:_:,._,...._.._.. ..;...._..._._.;:__"~,_c-,_".._..~._....___.,..,.~_.._..,'-C:~~!!~r.£~!~~!.~~!~_~,~~..!~~_~:.,._~~i_~~~_S~_~~~~[!:.,..~._.......,.:~~_~__...2~~:~1~_.....
10600.00
10625.00
10650.00
10675.00
10700.00
10725.00
10750.00
10775.00
10800.00
10825.00
10850.00
10875.00
10900.00
10918.61
10925.00
10950.00
10975.00
11000.00
11025.00
11050.00
11075.00
11100.00
11125.00
11150.00
11175.00
11200.00
11225.00
11250.00
11275.00
11300.00
Survey
. ---".-.- ~-""----:-;_. ·___···....________·____'___......,____-:-:~.'..-~.~.-'-.--.~n.~~---~..,.'.....~." ·._'_.~_.....~_.__.._...".<_._'.....9___._...............,-".-____......~-...",..-........-_..-.....-'~".........-----~---.-...-,~"_,....,._... -:___. ___........_.__.__.__ ___,_.._.._____ '" ".,_'__....__._'_..':'__'_....,_'___."....__._'_..~..,_._;._. "'0'''''' .....
EIW :MapNMapEYS DLS 'fFO. Tool
._..~,...__:.,"._...._...._"..;._.,._~.~_:,.....:....;.__.....__..,;.......~_~"._.,_....,._:...:..,_,_.:....~..".".~.........,..~:~t~;..~_~_.....__,.~.~~__..:...:.,..._......._..:... ..... ..
3920.94 5974620.15 655865.32 21.23 30.50 91.00 MWD
3909.22 5974641.98 655853.16 44.99 30.50 90.99 MWD
3904.11 5974654.48 655847.79 58.30 30.50 90.96 7
3900.34
3892.98
3886.87
3882.05
3878.51
3876.27
3875.34
3875.72
3877.40
3880.39
3884.67
3890.24
3897.07
3902.97
3905.07
3912.52
3918.70
3923.61
3927.24
3929.56
3930.57
3930.28
3928.68
3925.78
3921.58
3916.10
3909.34
3901.34
3892.11
3881.68
5974665.15
5974688.88
5974712.99
5974737.41
5974762.07
5974786.92
5974811.87
5974836.86
5974861.83
5974886.70
5974911.40
5974935.88
5974960.05
5974977.81
5974983.89
5975007.89
5975032.22
5975056.82
5975081.62
5975106.54
5975131.53
5975156.51
5975181.41
5975206.17
5975230.71
5975254.98
5975278.90
5975302.41
5975325.44
5975347.94
655843.81
655835.96
655829.37
655824.04
655820.01
655817.27
655815.83
655815.70
655816.88
655819.36
655823.15
655828.22
655834.56
655840.10
655842.08
655849.04
655854.73
655859.15
655862.26
655864.08
655864.59
655863.79
655861.69
655858.28
655853.59
655847.61
655840.37
655831.89
655822.19
655811.30
69.53
94.34
119.27
144.26
169.24
194.15
218.91
243.46
267.72
291.64
315.15
338.18
360.67
377.03
382.60
404.81
427.58
450.86
474.59
498.69
523.11
547.77
572.61
597.56
622.55
647.52
672.39
697.10
721.57
745.75
. __....... ,_._. . _m_.un__
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
91.00 MWD
90.99 MWD
90.97 MWD
90.95 MWD
90.92 MWD
90.89 MWD
90.86 MWD
90.82 MWD
90.79 MWD
90.75 MWD
90.71 MWD
90.67 MWD
90.62 MWD
90.58 8
269.50 MWD
269.51 MWD
269.56 MWD
269.61 MWD
269.66 MWD
269.71 MWD
269.77 MWD
269.82 MWD
269.87 MWD
269.93 MWD
269.98 MWD
270.04 MWD
270.09 MWD
270.15 MWD
270.20 MWD
270.25 TD
/ ... TOTs
.......................
'. /
........................
Mud Cross
TOTs
......./......,'
............
'. /
.......,........
BAG
1/27/2003
")
Flow Tee
2" combi ram/slips
middle of pipe/slips
2 3/8" ram
middle of blind/shears
,--.01
.o--J'
Mud Cross
middle of flow cross
~
~
-
2" combi ram/slips
middle of pipes
Blind/Shears
middle of slips
btlm of bag
top of bag
s-
a>
en
--
a::
All Measurements are from top of Riser
'"
)
f
')
)
~ U· r fA\ lTr ~c
.'0) .' I p\ I ,r~
cQ.. J LJ 1.J..J ':.'J
r'~ r[
I ~). I·r=¡
~. '~I
l.:;)u
lÃ'\ r· } If;\ (~ooV1/^\
ILl. U\,\ h\ tJ\
Lrll ._l.:1 [r\\ c.º) L: \J, LJ-Ù
TONY KNOWLES, GOVERNOR
AI1ASIiA. OIL AND GAS
CONSERVATION COMMISSION
333 W. -pH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Ted Stagg
CT Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re: Prudhoe Bay Unit F-04A
BP Exploration (Alaska), Inc.
Permit No: 202-100
Sur Loc: 2308' NSL, 2396' EWL, Sec. 02, TIIN, RI3E, UM
Btmhole Loc. 3572' NSL, 995' EWL, Sec. 01, TIIN, RI3E, UM
Dear Mr. Stagg:
Enclosed is the approved application for permit to redrill the above referenced well.
The pennit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
CJM &I~.~
camm~eChs!i Tay!ór
Chair
BY ORDER OF THE COMMISSION
DATED this~ day of May, 2002
jjc/Enclosures
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
12. Distance to nearest property line 13. Distance to nearest well
ADL 028277 1701' M D No Close Approach /
16. To be completed for deviated wells
Kick Off Depth 10150' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casinq WeiQht Grade Couplinq
2-3/8" 4.6# L-80 ST-L
Hole
3"
o STATE OF ALASKA
ALASKA Oi_-ÅND GAS CONSERVATION COMMIS,
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
o Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
KBE = 57.1' Prudhoe Bay Field I Prudhoe
6. Property Designation Bay Pool
ADL 028280
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number ./
F-04A
9. Approximate spud date
05/15/02 / Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 11250' MD I 8971' TVDss
17. Anticipated pressure {S~20 AAC 25.035 (e) (2)}
90 0 Maximum surface 2216 psig, At total depth (TVD) 88001 / 3272 psig
Setting Depth
Top Bottom Quantity of Cement
Lenqth MD TVD MD TVD (include staqe data)
2690' 8560' 7398' 11250' 8971' 49 sx Class 'G'
~A- s/bIOL.
hN -s: ~
,~
1 a. Type of work 0 Drill II Redrill
ORe-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2308' NSL, 2396' EWL, SEC. 02, T11 N, R13E, UM
At top of productive interval
2972' NSL, 1132' EWL, SEC. 01, T11 N, R13E, UM
At total depth
3572' NSL, 995' EWL, SEC. 01, T11 N, R13E, UM
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
10676 feet
9204 feet
1 0561 feet
9105 feet
Length
Plugs (measured)
Junk (measured)
IBP Packer rubbers and bands at 10561'
Size
Cemented
MD
TVD
Structural
Conductor
Surface
Intermediate
Production
Liner
96'
2004'
9312'
30" Cemented
18-5/8" 9200 sx Permafrost II
13-3/8" x 9-518" 2410 sx Class 'G', 1775 sx PF II
96'
2004'
9312'
96'
2004'
10665'
9-5/8" X 7" 460 sx Class 'G' (Liner Tie Back to Surface)
RECE>i6VED
Ivl (\v Un ? ?Q02
~ lr-\! 1- £... .
20. Attachments
Open: 10394' - 10404', 10440' - 10490'
Sqzd Intervals: 10193' - 10490'
true vertical Open: 8963' - 8972', 9002' - 9045'
Sqzd Intervals: 8795' - 9045'
1m Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch II Drilling Program
1m Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Ted Stagg, 564-4694
21. I ~erebY certify that t~ forj9~e and correct to the best of my kn~~ledge .
Signed Ted Stagg ~ ~1 Title CT Dnlllng Engineer
Commission Use Only. ,
Permit Number . API Number Ap~· Pfi1?1 n See cover letter
.2,.,02- - /C) ð 50- 029-20089-01 ) / {l)(/" for other requirements
Conditions of Approval: Samples Required 0 Yes ~o Mud Log Required D. Yes ~ No
Hydrogen Sulfide Measures Ji'Yes 0 No Directional Survey Required -..,g,Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 151<" 0 3.5K psi for CTU
Other: TtØà@ba1 S~ tø 3~~/o fJ k'. \d'~,,+-
Approved By Cammy Oechsli Taylm O~riG'OrEf\\ I A I~:eo:~::~sion Date .c; / ~0!f
Form 10-401 Rev. 12-01-85 1\ i \J' L '¡~mlt'jnl.TnPllcate
Prepared By Name/Number: Terrie Hubb/e, 564-4628
Perforation depth: measured
Alaska Oil & Gas Cens, Clj¡¡¡¡ÏII~~.;ml
An(;ho(~cw
Date ç/~f'1--
)
)
BP
F-04a CTD Sidetrack
Summary of Operations:
A CTD through tubing sidetrack is planned for F-04. The coil sidetrack, F-04a, will exit the 7" liner in Zone 2
and target Zone 1 B. F-04a will be completed with a fully cemented 2 3/8" liner. The existing F-04 perfs will
be cement squeezed with a 17 ppg slurry desiged to be used as a cement ramp for the F-04a window.
To prepare F-04 for the sidetrack, an X nipple in the production packer seal stem at approx. 8581' will be
milled from 2.313" 10 to 2.75" 10. Additionally, the X-O from the production packer mill out extension to the
2 7/8" tailpipe will be milled such that the 2 7/8" tailpipe will be dropped off and chased to TO. With a recent
TO tag at 10,510" , there is ample room for the 2 7/8" tailpipe in the 7" liner sump.
One fault, 15-25 ft throw, will be crossed in the horizontal section of F-04a. This fault orientation and throw
suggest a minimal risk of lost circulation but may present a geosteering challenge in re-Iocating Zone 1 B on
the far side of the fault.
Phase 1: Prep work. Planned for May 7, 2002.
1. Service coil to mill XN nipple and X-O ~ove tailpipe, push tailpipe to TO.
2. Service coil to lay approx. 25 bbls 17 ppg cement to shut off perfs and provide a cement
whipstock ramp.
I
Phase 2: Mill window, Drill and Complete sidetrack: Planned for May 15, 2002.
Drilling coil will be used to mill the window then drill and complete the directional hole as per attached
plan. Maximum hole angle will be 91 degrees.
Mud Program:
· Phase 1: Seawater /'
· Phase 2: Mill with seawaterlbiozan, drill with Flo-Pro (8.6 - 8.7 ppg)
Disposal:
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. /
· All Class I wastes will go to Pad 3 for disposal.
Casing Program:
The production liner will b;ë 3/8" ST-L from TO to approx. 8560'MD (7398 'ss). The liner will be cemented
with a minimum of 10 bbls to bring cement up to approx. 1 O,OOO;,or about 150 ft above the window.
Well Control:
· BOP diagram is attached. /'
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan. Max. planned hole angle is 91 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
· MWD Gamma Ray will be run in the open hole section. Memory CNL will be run inside the liner.
Hazards /
· The maximum recorded H2S on F Pad is 30 ppm on well F-43. .
· Zone 2 conglomerates may cause slow ROP, possible bit damage.
· One small fault mid-polygon may cause lost circulation.
')
)
Reservoir Pressure
Res. press. is estimated to be 3272 psi at 8800'ss (7.2 ppg emw). Max. surface pressure with gas (0.12
psi/ft) to surface is 2216 psi.
I TREE = 6" CnN
, WELLHEAD = McEVOY
ÄcrÜÃrÖR;; ·····Ofi5
.",..,'..,,,....,,,,,,.,,,,.,,,,.,,,.,.,,,,,..,,,,,.,.,,,. ,,,,,,,,,,,.,,,,.,,,,.,,,,.,,',,,,-,,."'"''''''''''''
KB. ELEV = 57.07'
.".,,,.,,_.,,,,..,,,.,..,-~,,,,,,'..,,,',,",,",.,.",,.,..'"''
BF. ELEV = 39.17'
KOP = 3000'
"""..,,,,..""""""""""""'''"''''''''''''''''''''''''''',,,,."
~x Angl~ = .. ,'. 40~.~999:
Datum MD = 10303'
Datum TVD = "ããõáSs
14-1/2" TBG-IPC, 12.6#, L-80, ID = 3.958" l-i
19-5/8" CSG, 47#, NSCC, ID = 8.681" l-i
113-3/8" CSG, 72#, N-80, ID = 12.347" l-i
)
F -04A
Proposed CTD Sidetrack
SAFETY ~'''''\ES: COMMUNICATION IN 18-5/8" X 13-3/8"
ANNULU~ JLED WITH CRUDE) NO LATCH ON VALVE
AT GLM #3.
-
1965' C
K
2000'
2022' ~
L
-
I Top of 2-3/8" liner l-i
13-1/2" TBG, 9.3#, L-80, ID = 2.992" l-i
,z
'3
8560'
8583'
17" TBG, 26#, L-80, ID = 6.276" l-i
1 TOP OF 7" LNR l-i
8642' I X
8642' II
I 9-5/8" CSG, 47#, N-80, ID = 8.681" l-i 9312' µ
ÆRFORA TION SUMMARY
REF LOG: SWS BHCS (RUN2A) ON 03/14/71
ANGLEATTOPÆRF: 34 @ 10193'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
4" 4 10193-10221 cmt'ed 07/25/98
4" 4 10261-10296 cmt'ed 07/25/98
4" 4 10310-10325 cmt'ed 07/25/98
4" 4 10332-10374 cmt'ed 07/25/98
4" 4 10386-10404 cmt'ed 07/25/98
2-1/2" 6 10394-10404 cmt'ed 03/16/02
2-1/8" 6 10415-10430 cmt'ed 07/25/98
2-1/8" 4 10430-10454 cmt'ed 07/25/98
2-1/8" 4 10440-10490 cmt'ed 08/06/98
2-1/8" 6 10454-10479 cmt'ed 07/25/98
2-1/8" 4 10479-10490 cmt'ed 07/25/98
1901' 1-i4-1/2" OTIS -XLB SSSV LAND NIP, ID = 3.813"
I I 1965'
/--1 2000'
'-1 2022'
ST MD
7 3715
6 5006
5 5887
4 6543
3 6891
2 7204
1 7326
II
I
x-
j--1
..
I PBTD 1-1 10561'
17" LNR, 29#, N-80, ID = 6.184" l-i 10665'
DATE REV BY COMMENTS DATE REV BY COMMENTS
06/26/76 ORIGINAL COMPLETION
OS/26/87 LAST WORKOVER
02/08/01 SIS-MH CONVERTED TO CANVAS
07/17/01 RNfTP CORRECTIONS
03/16/02 CWS/tlh ADD PERFS
1-i4-1/2" X 3-1/2" XO I
l-i 9-5/8" x 7" XO I
l-i 13-3/8" x 9-5/8" XOI
GAS LIFT MANDRELS
TVD DEV TYÆ VLV LATCH PORT DATE
3599 30 FMH-O BK-2
4598 47 FMH-O BK-2
5275 49 FMH-O BK-2
5781 48 FMH-O BK-2
6048 45 FMH-O BK-2
6289 48 FMH-O BK-2
6383 49 FMH-O BK-2
8492' 1-i3-1/2" OTIS XA SLIDING SLV, ID = 2.75" 1
8542'
8583'
- 7" Otis PKR w / X(HCL), ID=2.75"
(milled to 2.74" ID)
- ;;j-lt[ X ¿-(/~" xu
(milled)
8641' l-i 9-5/8" TnN SN-6 PKR I
9876' l-i MARKER JOINT I
10000' l-i Top of Cement
10150' l-i Cement Ramp Window
I /'0 bb~s
1 2-3/8" cmt'ed and perfed
10460'? l-i Tailpipe milled off and dropped 1
10561' l-i IBP PKR RUBBERS & BANDS I
PRUDHOE BAY UNIT
W8...L: F-04
ÆRMIT No: 71-0020
API No: 50-029-20089-00
Sec.2,T11N, R13E
BP Exploration (Alaska)
BP Amoco
P.,...t W..upatlll
Tie o. MDt
WELLPATH DETAILS
PI..Ø F~
80011200110'
F.....
10100.00
RItI·
Rat. Dat..,,:
V.s.ctloa
.....1.
Nordic 1
.1 ø.. 2/211.7100;00
O.':f~ ~~:;
:=~
31'.00' 0.00
REFERENCE INFORMATION
co-ordinate~lE) Reference: Well Centre: F-04. True North
V~~bn (Vg¡ ~:::~:~~: ~~t~~ roe~J.gaoÕ~)1
Measured Depth Reference: 4: 04 212/1971 00:00 57,10
Calculation Method: Minimum Curvature
alcnON DETAR.&
aLeg TFace Tatle'
· 10100.00 304.00 104.00 ,,'t.5t 612.21 411137 i 0.00 ..11M.Ot
2 t 01 5G.00 :w.OO 103.60 ..12." 5!1r 411ÞO.153 ...... -U51.12
3 10,.400 28.10 105.84 ....... 4117.58 170.00 ..1155.8-4
4 10117.80 11.00 UI.55 ..,15.7. 42to.15 110.00 ..1184..41
· ~mi:5 =:~ 221.51 aal2.43 42'12.18 .....00 ..11 13M
8 107.21' ..,4.... :::::; 4O:n." ...00 ..ID5ðA3
7 e." oan.20 3I1S." ... 00 .e7f.U
8 ~~rs::: =:~~ UI.D7 ..12... ~ ::::~ U,'&.21 ·00.00 -503.42
· 11.41 &.'1.21 :1177.58 00.01 -421.84
ANNOTATlONI
TVD liD Aft.otatio_
IU1,,1 10100.00 TIP
1172..1 10180.00 KOP
......2 101M.OO ,
1711.71 10187AO 2
..12.12 10:n7.10 2
1174.U 10172... :
..71.20 10170.00
1172.21 11OM.00 I
1171.21 11250.00 TD
----- ~----
8350
8400
8450
8500 :
-
.5 8550
ì 8600
-
J: 8650 .
..
Do
a. 8700 .
a
'i 8750
CJ
:e 8800
a.
> 8850
a.
~ 8900
8950
9000
9050
9100 ' F-04 If':04)
+£loW SI",ape
~ERr1 r~~~ ~illü ~H er
-~
I
!.:...:
, .
~ :!L
~··I.
. F-<l4A T5.1·
I
re..
.....
LEGEND
F-<l4 (F.Q4)
PIan#5 F-04A
Plan #5
T
^M
!
é
Direct: (907) 267-6613
E-mail: brij.potnis@inteqcom
Baker Hughes INTEQ: (907) 267-6600
Obp
h~TEQ
Plan: Plan #5 (F-04/Plan#5 F-04A)
Created By: Brij Potnis Date: 4/18/2002
Azimuths to True North
Magnetic North: 26.34·
Magnetic Field
Strength: 57502nT
Dip Angle: 80.82·
Date: 4/1812002
Model: BGGM2001
Contact Information:
180D-=:-- .~-==------
1900 =---:~. -----~~~-
------~-----
1700-..:-:..::-_~~
1600-:~---~ --
-----------~-
15O<r~
ë'140<>-::~~_
æ 1300 ~. .----=---~
o
~ 12~_
-
+1100 .::._
:ë
1:: 1 000-~ ---====._
o _
~9~::::.
.
i 800-=-·~
:s
o
en
--- - -------
~-_._-
~---
------------
----~-
------
--
: F:04A PoIygon5, 1 c----
--
- .. ···.:.~~-~1"<2 .
__, -c=CC= ~"" -c=~~ '~~= C='-_
--
--- ---.------
-- - --------- -
-------
-~
--- - ------
'-'
---
- ------ - - -- ---
----.------
- -------
70()------ ---~..,
600j:-~ -
---
- -----------
-- -- -----
----~--
------------
----------------- - -- - -----
500- =-::=::::--~ ___.___,
40o---~~__====
3oo-=-----~·
20~~_
----~---
2800 2900 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000 5100 5200 5300 5400
West(-)/East( +) [100ftlin]
--~-
- - -- --~-~-
---------------
-" ---~---- --------
--------~-
------~_._-----
----------
----"-~
- - ---"-
----- -~----------
-----------
. ~===____:...---;:::n.== : -.lIE
---~- -- -~~----
---
--.
- -------- -
.--~------
-------
----
----
_------; PIan#5 F.Q4Ai
- -;';.IQ.: ------
._---1,._ .____
--------
- ----~-----------
--------
¡ F-<l4A T5,2 ,
---
-----~-----~
--
--------"-----
---- ---- -
---- ----------------
------------------~~-----
- -------------- --- -------
- ---------"---
-1350-1300-1250-1200-1150-1100-1050-1000 -950 -900 -850 -800 -750 -700 -650 -600 -550 -500 -450 -400 -350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 350 400 450 500 550 600
Vertical Section at 336.00° [50ft/in]
11/18/2002 2:23 PM
)
')
.....11....
.....~
.--.----.-.------
INfEQ
bp
BP
Baker Hughes INTEQ Planning Report
.."..~._-..,~,.,._'-~...."_..._--,._.._._..~......,._-.,.~.,-_.._'~-..."...__._._.~.,,-....,.---'"-~_.-..---..'"...~_.._-,-_.---,~-........,---,
..-_,~._...__.. ,...__.._'._'_......'"":'".-.....,._.,._._...,...__..__..."_._""~_-:--.__._.,:._.._~'~_..__,......_...,~"._....._.__. ..__ "'_'M"
".__._,~....,,--_.,_.
IJafe:·.·i... 4/18/2Q02..··...····!' .............. ··...'ti.ne:i,·14:24:15'.......'..·..·'.·.... '.. .....',:,<...... ~åge:
Ç()+Ord¡~ate(~~)R:ef~r~~c~:..·'.'· .,YV~II:.f:~94;Trµe:NOl'tr,,··.< ....
,·.···y~tttc~~('f~º), ~ef~r~~c~:····i'.., ·..........s~$t~IYI;'M~~n·$~at~\l~1 '
Section,.(YS) Referente: Well.,(ŒOON,O.OOE;336.00Azi)
"_'__"'_"_'__.'.'._ un. _.. __ ______hn__.__ __n_...~~!~~~u~~t~n M!~.~.~:_~.~i~mu~_~~~~_t-':l~~_n__~Y~:... ~~a~.I.~._.._ _h.
Company: E3PAmóco
Field: Prudhoe. Bay
Site: PBFPad
Well: F-04 .
.,.~~~.~~~~~_.:.~!~.~!!:~f=9.1fL_._.~_.
1
-.-..--".".-,.......-.,--.----.".-."-,..,,. ..- -.~.....,"..._..,_~___~,_. __... _"_ .. _ .._ n____.________ _ ..___. ... _.__.___.__..______ __.____.
--- -.~-----_." -- ---- - - -- .--
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
.'''., ..-." """. "_. -" ..".-..-..~.. '--"-
Map Zone: Alaska. Zone 4
Coordinate System: Well Centre
Geomagnetic Model: BGGM2001
_. ._._,__.._'_.w,·._..___._,_____..~.._,__~.___.,._,_,____.._..,____.__.,_...,..'_~.____ __,-__,_,_,_"_,___,." ,,_~..,._._..,__
.. .--.........." .... ,.,_." ..---...-.-....-- ..,.-.,-..,. ,-,- ...-
_. _.._,___.."_,.,_,,...~.._,_..___ .._ _·'_'.'__'~'._n'_'__'__"'_
_..,-,,-, .--.--'.,.....-........"--..,.,,-,....., ._~."- -., -.---.-.--- ..._,- ,.----..--.--...,-,..-..".-.-_____"......,.. "__.__._._.__"._.,_,_._...__,.__.._.,_."._.______,,__,,_.,.__...."..w.__._._,_"'_...__.,____.._..._..._, ..____._____.,.__.____..______._"___,_..._,,._._.._,....___"...'.._'...__..
Site: PB F Pad
TR-11-13
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
F-04
F-04
Well Position:
Well:
-, "....... ..-- -.-.-.-.,,-.----
5972527.29 ft Latitude: 70 19 55.283 N
650960.70 ft Longitude: 148 46 31.468 W
North Reference: True
Grid Convergence: 1 .15 deg
_ .. .... -.-.-..- --- ,,,,_,.._.,,... .._._.____._ .__.__... _., _..___...~._., . w..__.._"'.__._..,_..__._...__..._..w"_.______._._,_·. d...._'_..·_..".__.._,,_..__,,_._""..._..._ .........._.._,,__.._......_. _"__'__~"_'" ..___..._. "._...._.
-- _ _ .... --"--"" .-.'" "."" ._.~._.
.... - - . - ..-. -... 'w ....,_.... _....'"'___".w,~...__._~,,__.__ __ ~.~.._._._.._______ ____ __·_..____·_._._.._.__.._.__."_,,_..._...w..._....__.,,.._.,"'_"__"_.._.. ....._.._ ___..._.._.___.__...,.._..._____..._......w___.___.____._..._.__ .._._...._._..".."_.,,_,.,,__~.__._.._,.,,..,.._.
Slot Name:
04
70 20
148 46
7.875 N
1.527 W
+N/-S 1280.42 ft
+E/-W 1025.27 ft
Position Uncertainty: 0.00 ft
___'_ _ __ _. _ .·___·________...___·_."___..·_n.._·__..._._"._m.._.__..,__.....
Northing:
Easting :
5973827.99 ft
651959.92 ft
Latitude:
Longitude:
--..--.-.--..-"" ----.-.,.-,-..,--
. .n....._.......· ._._.......
'-' -- - -..--.-...... ..._---~.--_._--.,'" .-- ......---
...-..-.-..--.....-.----.---... .._~" .... . ....-.......-".,-.- ..---
... ~.......... ...._._.. __.__.._.._._.._,_n_
Wellpath: Plan#5 F-04A
500292008901
Current Datum: 4: 042/2/1971 00:00
Magnetic Data: 4/18/2002
Field Strength: 57502 nT
Vertical Section: Depth From (TVD)
ft
0.00
Targets
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
F-04
10100.00 ft
Mean Sea Level
26.34 deg
80.82 deg
Direction
Height 57.10 ft
+N/-S
ft
0.00
336.00
.- - - - .- - -....- -.- ...~- .-.-.-- .-~ ...-.... --.--.- --.. -. ·___n.· ~ ...._ h_..n .. ._.' ._...._...._~__.._ ...__........_.._ ___._.__......_ . _."__".._,,. ___..._.....__ ._.~_ . ....____ ._,..._,,_ .._____.._......__.._.,...,.__...___.. ._.._. ...__..___.....__........__..__..___... ~__._._......._h......_.
Annotation
MD
ft
ì 10100.00
10150.00
I 10164.00
10197.60
10297.60
, 10573.99
10970.00
11094.00
. 11250.00
Map Map <---·Latitude ~--> ~..;..Longitude. --->
Name Description TVD+N/~S :+E/..W No~thingEasting .l)egMinS~ peg.l\1inSeç
n..~P.~... ...... .......... ~.I)ir:,. ...c. ..c_.!~..__,._.._._,.:..._:_~:...........,_.,'".~.....~.c_..__ ...:....:.._ ..._ .c. :~:._.~..._.c.. ._.~_~_:.._~_: _.___..._:.--'......_.._...__._ ____...._....___...._._._.._....... .C..:.--'..... ...._... ....... ..
F-04A Polygon5.1 0.00 1446.74 3760.24 5975350.51 655689.79 70 20 22.095 N 148 44 11.694 W
-Polygon 1 0.00 1446.74 3760.24 5975350.51 655689.79 70 20 22.095 N 148 44 11.694 W
-Polygon 2 0.00 1471.50 4020.81 5975380.54 655949.79 70 20 22.337 N 148 44 4.082 W
-Polygon 3 0.00 733.68 4151.00 5974645.57 656094.89 70 20 15.080 N 148 44 0.292 W
-Polygon 4 0.00 526.46 4506.93 5974445.62 656454.92 70 20 13.040 N 148 43 49.900 W
-Polygon 5 0.00 198.35 4160.23 5974110.57 656114.96 70 20 9.815 N 148 44 0.031 W
-Polygon 6 0.00 459.15 3875.40 5974365.53 655824.93 70 20 12.381 N 148 44 8.345 W
-Polygon 7 0.00 1044.98 3842.18 5974950.52 655779.85 70 20 18.143 N 148 44 9.306 W
F-04A T5.2
8970.00
8975.00
1446.72 3933.49 5975354.00 655863.00
667.00 4056.73 5974577.00 656002.00
70 20 22.094 N 148 44 6.633 W
F-04A T5.1
70 20 14.425 N 148 44 3.046 W
._.. ·..._·_._w...__.. _""'_
.·_._.__n_·._._____w.._._.
------.-,,-.-.--...,,---.---.--..-..-.---.---.-.-.-.----
TVD
ft
8631.51
8672.96
8684.92
8715.76
8812.43
8974.84
8973.20
8972.29
8971.21
... --. -_.......---..-- ~.
__.._._. _. ______w.__.__._...h .___..___.____...._._w_____._._.__...~,..__._..._. ._. ___ _..____... _______. ..._____ .__.__...,_____.__._ ,,______. ._..w_...._.. ...,___ ~ ___.__._~__...__._. ..,,_. ....
TIP
KOP
1
2
3
4
5
6
TO
,O~:'·:!;'·'bP
,..,.10,:"...",:",,1.,. ...,1 ':'--...
I ,¡'I,!-,' ","
)
)
BP
Baker Hughes INTEQ Planning Report
.
1~1"(lÍQ
. .",._.~....."_"..,..µ.~,_,_",,._L"'" ..,---....,_.."'.~..'.~.-.·r.~...._._.-.._-,-...--~...~-.._.. _ _"..__ .;,......____,.._._.,.__.".___.. ,___.__,__._.",,~.~_-...-__.._..__.-:-_,__._..._......,..-__.~...~__,...'-.....---.-.....-...,-..-.----.'-.--,......,--'..,..~.-r_.--.-~..---_.'"---....._,,-...-_._.._..".,-,,_.._¥..__.-~._--'----,'"-_._.. -"......- ,"'.','..--------.
COItl påny: BP AmocoD~tê:)~118/ZQ02 ...i .. ···.·Jim~: ,t4:24:15i.... :.·.·......ip'age: 2
Field: Prudho&.Bayç~;'Or~¡llate(N~l.~er~rellce:· 'W~U:F~04,TruElIN()rth
Site: .. PBF Pad V~I1;~~al(T"J?)R~fe..e~ce: Sy~!em:I\I1ߡanSElaL~vel
Well: F~04 Sec:ti?n'(V~)~~(er~nce: ...:....... Well (0.OON,O.00E.336.00Äzi)
-~~~:~~~~;::,:.~~~~~,~c:.~~~t-;":::.,,c:.:c:::c..,,::::::~::::·:::c-·_-·:.:.":.:-::::~:::::::~:'::==::·=:="·.:::::::::=:=-~~~~:~~=~:~~~~:~~~~~~~~.~c~~~=:::::~~~~~~~~r~~~~~r;=".::::,::".::c:::~~L.2~~?1~,...:c::::...,
Plan: Plan #5
New targets from Roger Sels
Principal: Yes
.~.'~_' ..n ".~ .__ _.."..._.....___ __ ....__ .,____ ,_.._._, ,,__....__... ..,..._.._,_~'.... ._ .. ._._..____.____"'_'.._...__...._.____._.,_......_..... .,~"_..___.._,.._~.._..._.._,,._..__.,.
Plan Section Information
Date Composed:
Version:
Tied-to:
4/18/2002
1
From: Definitive Path
__."..._______.__._~",_.______..w_____.___,_.__._...._....'".___..._.....__,_____.._.._,_._ . ___.. '__'__"___'__'" .,_ _. .""_..."_ ''''0
. ..~.__ ",'.. '" _.~_,."...".."._ "_.."_.,,,, ,.......__ .,',. ~__'.'.._.",..._,_._"_"."..,., ~.._._~..,',.,__"._,.,.._",." C"_' '..._'_' ...."__,,~_..,,....~,~."_.~. .~.__~,.~.__".._,.._,"...,,,.""~~._._~..__..__...,,.. ..._,__·,_·."_._ø___,._"__.___.~._..._~·~,, __'~'_"'.""'__'_'. ,~.._....~".~__,.__~."'.._.__,.."._~.__......,~~__."._'...._.."~.. __~__..."'~......"_.~.~.. ....~ ..---....-.-....-,..,. ,-"._,-"'" .~-
MD
ft
.H.'····..,,",,·..·~,,'_··_,,··~..
10100.00
10150.00
10164.00
10197.60
10297.60
10573.99
10970.00
11094.00
11250.00
Incl Àzim, TVD
deg deg ft'
~.,.." ..,'_ ..., .:....,.;.. ..,,~...:. ..~........ __.. ""_"'H~'_''';':'';'_ .._,__. .: __,:..._,.."..I...:...~,..:~. _ .~:... ~~c.",:-..: ,._.
34.00 104.00 8631.51
34.00 103.50 8672.96
28.50 105.54 8684.92
18.00 111.55 8715.76
21.25 221.56 8812.43
90.00 307.27 8974.84
90.43 6.67 8973.20
90.41 348.07 8972.29
90.37 11.47 8971.21
+N/-~+E/..WDLS:øuild\ T#rn T~ØTa.rgef
..._,...._._.~:~...._._...~.__',.,"_.!~~:.".._..~~e.:~~ 'oQf(~égJ1:OQftde~!1BB~__.._~ê~~_....c . . ... .c~:L~l..__L...~_.:."-~__. .:_.
612.33 4163.37 0.00 0.00 0.00 0.00
605.68 4190.53 0.56 0.00 -1.00 269.79
603.87 4197.56 40.00 -39.29 14.54 170.00
599.81 4210.15 32.00 -31.25 17.91 170.00
580.05 4212.56 32.00 3.25 110.01 140.00
638.30 4031.98 32.00 24.87 31.01 86.00
986.63 3883.88 15.00 0.11 15.00 89.50
1109.95 3878.21 15.00 -0.02 -15.00 -90.00
1264.87 3877.58 15.00 -0.02 15.00 90.01
Survey
MD ... -. ···i;~I·n .. ····..~i;_·h. ···--SSTVO---·---··N/S·····,.----·- -·-·Eïw····..·· ·····--:ï\1~;N-··_·· "T-~~~~~n..-. ······-·;·VS··-·······-·"£iLS·····,.··TFO. T6~i""'l
~.. . ..._........... ~~.~... deg.... ..:: .....:....~......, .....:....c.:._....~_~..:c. I....;.::". ....!!c..:.:.,-,...,..:",-: _;._c~:c~.:.:.,...~c':_' ...,..~.~._:.-,--,.,,; . ...",.....:_,~..~~.__,....~.~~~~~~..e~?~._....:~~§,.._.. ......_.....'c~..":...
10100.00 34.00 104.00 8631.51 612.33 4163.37 5974524.50 656109.72 -1134.01 0.00 0.00 TIP
10125.00 34.00 103.75 8652.23 608.98 4176.94 5974521.43 656123.36 -1142.59 0.56 269.79 MWD
~g~~~:~~ ~¿:~~ ~~~:~~ ~~~¡:~~ ~~~:~~ :~~~:~~ ~~~:~~::i1 ~~~~¡~:~i ~~ ~~~:~¡ 4~:~~ /~~~:~~ ~OP
10175.00 25.04 106.98 8694.74 602.49 4202.31 5974515.46 656148.85 -1158.83 32.00 170.00 MWD
10197.60
10200.00
10225.00
10250.00
10275.00
10297.60
10300.00
10325.00
10350.00
10375.00
10400.00
10425.00
10450.00
10475.00
10500.00
10525.00
10550.00
10573.99
10575.00
10600.00
10625.00
10650.00
10675.00
10700.00
10725.00
10750.00
10775.00
10800.00
10825.00
10850.00
10875.00
10900.00
10925.00
18.00
17 .42
12.57
11.79
15.69
21.25
21.32
23.47
27.74
33.32
39.65
46.42
53.47
60.69
68.01
75.41
82.84
90.00
90.00
90.03
90.07
90.10
90.13
90.16
90.19
90.22
90.25
90.28
90.31
90.33
90.35
90.38
90.40
111.55
113.20
138.31
176.75
206.78
221.56
223.67
244.00
259.75
271.10
279.36
285.61
290.57
294.69
298.26
301.47
304.48
307.27
307.42
311.17
314.92
318.67
322.42
326.17
329.92
333.67
337.42
341.17
344.92
348.67
352.42
356.17
359.92
8715.76
8718.04
8742.21
8766.68
8791.00
8812.43
8814.67
8837.82
8860.38
8881.93
8902.03
8920.30
8936.39
8949.97
8960.79
8968.63
8973.34
8974.84
8974.84
8974.83
8974.81
8974.77
8974.72
8974.66
8974.58
8974.49
8974.39
8974.27
8974.15
8974.01
8973.86
8973.70
8973.53
599.81
599.53
596.02
591.43
585.85
580.05
579.41
573.93
570.71
569.80
571.23
574.97
580.95
589.04
599.10
610.92
624.28
638.30
638.91
654.74
671.80
690.02
709.32
729.62
750.82
772.85
795.60
818.98
842.89
867.23
891.88
916.75
941.73
4210.15
4210.82
4216.08
4218.04
4216.66
4212.56
4211.97
4204.34
4194.12
4181.51
4166.76
4150.14
4131.98
4112.65
4092.50
4071.94
4051.36
4031.98
4031.18
4011.83
3993.56
3976.45
3960.57
3945.98
3932.75
3920.93
3910.58
3901.75
3894.45
3888.74
3884.64
3882.15
3881.30
5974512.93
5974512.67
5974509.26
5974504.72
5974499.11
5974493.23
5974492.58
5974486.95
5974483.52
5974482.36
5974483.49
5974486.89
5974492.50
5974500.20
5974509.84
5974521.24
5974534.18
5974547.81
5974548.40
5974563.83
5974580.52
5974598.39
5974617.36
5974637.35
5974658.29
5974680.07
5974702.61
5974725.80
5974749.55
5974773.77
5974798.33
5974823.14
5974848.10
656156.74
656157.42
656162.75
656164.80
656163.53
656159.55
656158.97
656151.46
656141.31
656128.72
656113.94
656097.25
656078.98
656059.48
656039.14
656018.34
655997.50
655977.84
655977.02
655957.36
655938.76
655921.28
655905.01
655890.01
655876.36
655864.10
655853.29
655843.98
655836.21
655830.01
655825.40
655822.41
655821.05
-1164.47
~1165.00
-1170.35
-1175.33
-1179.87
-1183.50
-1183.84
-1185.75
-1184.54
-1180.23
-1172.92
-1162.75
-1149.91
~1134.65
-1117.27
-1098.10
-1077.53
-1056.83
-1055.95
-1033.62
-1010.61
-987.00
-962.91
-938.44
-913.68
-888.75
-863.76
-838.80
-814.00
-789.44
-765.25
-741.52
-718.35
"',"',-_. -.---.,--..-.---- ..~--_. ._, -----.---
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
168.71 2
140.00 MWD
138.43 MWD
114.13 MWD
76.49 MWD
47.27 3
86.00 MWD
84.04 MWD
65.20 MWD
50.98 MWD
41.18 MWD
34.52 MWD
29.94 MWD
26.75 MWD
24.50 MWD
22.95 MWD
21.94 MWD
21.37 4
89.50 MWD
89.50 MWD
89.50 MWD
89.50 MWD
89.51 MWD
89.52 MWD
89.53 MWD
89.54 MWD
89.55 MWD
89.57 MWD
89.58 MWD
89.60 MWD
89.62 MWD
89.65 MWD
89.67 MWD
bp
)
)
BP
Baker Hughes INTEQ Planning Report
C
í~I"'(ß.Q
Field: ··Prudhoe Bay C~-p..di~~te(N~)ª~r(!rel1ce: 'JV~U:t~p4,TrUE;lNørjh
Site: PBF . Pad :V~rt~c.I(1fYml{ef~r~l1ce: Sys~~rn:Me.~n$~~'L~vel'.
Well: F-04 :$eÇtion(VS)Reft:reoçe:, . .....\IY~II (O.OONO;00E.~36~OO~D
_. .~~~~.r>..~~.~:_ .~I~~~?_~~~~~_.,________.__:..__.._~____._._~___-,~____~_______:_.:___~_~"___::.c____~~!1':~~_£~I~~~1!~~I!~.!~cI:. ___.:..~~~~~~~~"-ç:,::!~t~l~____c.,,_""~~~::..,_,9~~~I.~
Survey
-"'-~ "- ~~ .~,,~ .-:-".....-.,-"~~.,,_.,,--:-'_..~~-":-- "·~'·-ë-:--'-·'·_~~-"-,-'-·-··_,·-..·_~-,· "-:":"''':''':~' .---:---."._",-.:,,~,":- ·~'''·,~-7'''''-·-~~'~~'~~-'ë~···'·_·--~~·:-:"·~:·',':'''--:-~~·:-,--~''':"':-·:--~~-:-:-'·~-:-:"-·~-·~-~-:-,""'":"7"-:--"'-;'"",,:,,",,:~~~'-;-_.'~--:-":'T""'-·,~--~._-..,..'--~.-:--_.~_.:----...."..-:-~-~,.._._~-~_._--~.,.._--
MD loci Azim SSTVD ~/S EIW MapN ~~p~ VS·' .ÐLS TFO Tool
ft deg deg ft . ft... ft... .. . ft...... . .. ft'.. ff; d;!g(1()Oft deg
. '... ,~,-,~"... ......;·~....._...~."__...,,...~.__.__~____~~"".._~~___u__~_._.:..._.___ '".._~._...,_,_..:....:-__.....__.:.._.,_..:. _.,__.__._, .":",.,.~...;.,,,...~o:.____~._~.:....__'_._...........;,........._.:.....,............_._~.,~,'~'''''''__'_''''''''''._ ";';""-_""_~.'';''..._....__........._...:.........",-:...._..:..._~._"......,~.~....__~,_'':''_..~,.~........;.~...;..:..... ..:...:..............,......;.._._._....."......~, __...,.._._.~_
10950.00 90.42 3.67 8973.35 966.72 3882.08 5974873.09 655821.33 -695.84 15.00 89.70 MWD
10970.00 90.43 6.67 8973.20 986.63 3883.88 5974893.04 655822.72 -678.38 15.00 89.72 5
10975.00
11000.00
11025.00
11050.00
11075.00
11094.00
11100.00
11125.00
11150.00
11175.00
11200.00
11225.00
11250.00
90.43
90.43
90.43
90.42
90.41
90.41
90.41
90.41
90.40
90.40
90.39
90.38
90.37
5.92
2.17
358.42
354.67
350.92
348.07
348.97
352.72
356.47
0.22
3.97
7.72
11.47
8973.17
8972.98
8972.79
8972.61
8972.42
8972.29
8972.25
8972.07
8971.89
8971.72
8971.55
8971.38
8971.21
991.60
1016.53
1041.53
1066.48
1091.28
1109.95
1115.83
1140.51
1165.39
1190.38
1215.36
1240.22
1264.87
3884.43
3886.19
3886.32
3884.81
3881.67
3878.21
3877.01
3873.04
3870.68
3869.96
3870.87
3873.42
3877 .58
5974898.02
5974922.98
5974947.97
5974972.88
5974997.61
5975016.21
5975022.07
5975046.65
5975071.48
5975096.45
5975121.44
5975146.35
5975171.07
655823.17
655824.43
655824.05
655822.04
655818.40
655814.56
655813.24
655808.77
655805.91
655804.68
655805.08
655807.13
655810.79
-674.07
-652.01
-629.22
-605.82
-581.89
-563.42
-557.56
-533.40
-509.71
-486.59
-464.14
-442.46
-421.64
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
270.00 MWD
269.99 MWD
269.97 MWD
269.94 MWD
269.91 MWD
269.88 6
90.01 MWD
90.02 MWD
90.04 MWD
90.07 MWD
90.10 MWD
90.12 MWD
90.15 TD
/
TOTs
Mud Cross
TOTs /'
BAG
4/29/2002
Flow Tee
2" combi ram/slips ...................
....... ..........
middle of pipe/slips
.......................,
2 3/8" ram
middle of blind/shears
--
--..J
Mud Cross
middle of flow cross
--
~
//./~.-..-
2" combi ram/slips
middle of pipes
,...'....,'.......,..
Blind/Shears
middle of slips
bUm of bag
top of bag
s-
O)
en
--
c:::
All Measurements are from top of Riser
)
)
H 206698
DATE
04/11/02
CHECK NO.
00206698
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
iOO.OO
VENDOR ALASK.AO I LA
DISCOUNT NET
iOO.OO
00
040902 CK040902
PYMT COMMENTS:
HANDL:NG INST:
PERMIT TO DRILL FEE
SiH - TERRIE HUBBLE X4628
H
, .,..
~O'-/A
',;- ."
"-
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
iOO. 00
100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AfFlUATE OF
NATIONAL CllY BANK
CLEVELAND. OHIO
No. H 206698
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
--¡:j"2
00206698
PAY ONE HUNDRED & 00/100************************************* US DOLLAR
DATE
04/i1/02
AMOUNT
$100. 00
To The
ORDER
OF
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE AK 99501
NOT VALID AFTER 120 DAYS
-"
Q "~.."r",. .n'"
{!- !I
,.; /. ¡
\ <:--9 (!;¡ V\d~4-_,
--
III 2 0 b b 9 B III I: 0 ~ . 2 0 ~ B 9 5 ': 0 0 8 L. L. . 9 III
...
)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETIERlPARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LEITER
WELL NAME -it u F-·() Y A
CHECK 1
ST ANDARD LEITER
DEVELOPMENT
CHECK WHAT APPLIFS
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
DEVELOPMENT
RED RILL
Pß..,OT HOLE (PH)
v
EXPLORA TI0N
ANNUL~ DjS'f"OSAL
~NO
INJECTION WELL
ANNULAR DISPOSAL
<..--> YES
INJECTION WELL
RED RILL
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new weUbore segment of existing well
----J Permit No, ,API No. .
Production should continue to be reported as a function of
the original API number stated above. .
In accordance with 2.0 AAC 25.005(t), all records, data and
logs acquired for the pilot hole . must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for wel~ (na.me on permit).
Annular disposal has not been requested. . .
Annular Disposal, of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated... .
ANNULUS
L-J YES +
SP ACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved ,sùbJect to
full compliance with 20 AAC 25.055. Approval to periorate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
WELL PERMIT CHECKLIST· COMPANY I3fX WELL NAMEfßú ¡::ðt¡fA PROGRAM:Exp _ Dev L Redrll ~ Re-Enter _ Serv _ Well bore seg_
" FIELD & POOL " r; c..¡ ol- ~ ò INIT CLASS () .p~ / ... e>f / GEOL AREA t:ë? t'j UNIT# / / C. <' ð ON/OFF SHORE ~
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . fY\ N
2. Lease number appropriate. . . ~ . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. W ell located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. W ell located proper distance from drilling unit boundary. ... . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. ". . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . I. ~ N
(Service Well Only) 13. Welll?cate~ v:(in ~rea & strata ~uth?rize? by injection order #_ "5:Y /z/L A \
(Service Well Only) 14. All wells wlln ~ mile area of review Identified. . . . . . . . .". h N
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . (Ei
16. Surface casing protects all known USDWs. . . . . . . . . . . Y N /
17. CMT vol adequate to circulate on conductor & surf csg. . . . . . Id It--
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . -'f--N-
19. CMT will cover all known productive horizons. . . . . . . .. . ~ N
20. Casing designs adequate for C, T, B& permafrost. . . . . . . .. NT·
21. Adequate tankage or reserve pit. . . . . . . . . . . . . . . . . N C-. \) L..l.
22. If a re-drill, has a 1 0-403 fo~ abando nment been approved. . . "& N 5' (p I 0 L
23. Adequate wellbore separation proposed.. ...". . . . . .. . . (YJ N
24. If diverter required, does "it meet regulations. .. . . . . . ". . . Y N tJ lit-. ,
25. Drilling fluid program schematic & equip list adequate. . . . . éí) N i11 ~11 Itl J¡J -8. 7 tl Pi .
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . GJ N
APPR DATE 27. BOPE press rating appropriate; testto 35"00 psig. éj) N
I. ;c'A- 28'. Choke manifold complies w/API RP-53 (May 84). . . . . . . . œ. N
~ ,12. 8'03' 29. Work. will occur without operation shutdown. . . . . . . . . . . ?i2 N
. 30. Is presenceofH2S gas probable.. . . . . . . . . . . . . . . . Y (Q/
(Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . . . --v-N N/ A-
GEOLOGY 32. Permit can be issued wlo hydrogen sulfide measures. . . . . (ý) N
APPR ~D,*, TE 33. Da.~a ~resent.ed. on po.tential overpressure. zones. . . . . . . . ){. . . . ./1
.-',#,; h (. / 34. Seismic analysIs of shallow gas zones. . . . . . . . . . . . . y. /I..), M \
/YJ'. ~?ð< 35. Se~bed condition survey (if off-shore). . . . . .. ...... N
(Exploratory Only) 36. Contact namelphone for weekly progress reports. . . . . . .. Y N
APPR DATE
~~
Rev: 10/15/02
~~',vrl___ ,.p,u,'s.~ .£. r-A~,..~i.~/ / Io,u
~J /,r'Y"-<''''~ 57"J J+_, .
I'
~
GEOLOGY:
RPJ'Æ'
RESERVOIR ENGINEERING
JDH
UIC ENGINEER
JBR
PETROLEUM ENGINEERING:
TEM
COMMISSIONER:
Commentsllnstructions:
~: Co! j;ç?(03
MLB Clf 12~/o3
SFD
/
MJW
WGA
G:\geology\perm its\checklist.doc
WELL PERMIT CHECKLIST COMPANY LJj>)I WELL NAME~ß'óf ¡::~- (')t(A
FIELD & POOL r:; r:.;Ò /.5 /*') INIT CLASS /lQ?.{/ / '" 0:)
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . .
2. Lease number appropriate. . . . . . . . . . . . . . . . . . .
3. Unique well name and number. .. . . . . . . . . . . . . . . .
4. Well located in a defined pool.. . . . . . . . . . . . . . . . .
5. Well located proper distance from drilling unit boundary. . .
6. Well located proper distance from other wells.. . . .
7. Sufficient acreage available in drilling unit.. . . . . . . . . . .
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . .
9. Operator only affected party.. . . . . . . . . . . . . . . . . .
10. Operator has appropriate bond in force. . . . . . . . . . . . .
11. Permit can be issued without conservation order. . . . . . . .
APPR DATE 12. Permit can be issued without administrative approval.. . . . .
tfk- ~/o 2- 13. Can permit be approved before 15-day wait.. . . . . . . . . .
ENGINEERING 14. Conductor string provided . . . . . . . . . . . . . . . . . . .
15. Surface casing protects all known USDWs. . . . . . .
16. CMT vol adequate to circulate on conductor & surf csg. .
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . .
18. CMT will cover all known productive horizons. . . . . . . . .
19. Casing designs adequate for C, T, B & permafrost. . . . . .
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . .
21. If a re-drill, has a 10-403 for abandonment been approved. . .
22. Adequate wellbore separation proposed.. . . . . . . . . . . .
23. If diverter required, does it meet regulations . . . . . . . . . .
24. Drilling fluid program schematic & equip list adequate. . . . .
25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . .
APPR DATE 26. BOPE press rating appropriate; test to 3~oo psig.
\J-JG,A s / (pI az. 27. Choke manifold complies wlAPI RP-53 (May 84). . . . . . . .
28. Work will occur without operation shutdown. . . . . . . . . . .
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . .
30. Permit can be issued wlo hydrogen sulfide measures. . . . . Y (£Þ .
31. Da~a ~resente~ on potential overpres. sure zones . . . . . . . Y N /" ) /7
32. Seismic anal~~ls of shallo~ gas zones. . . . . . . . . . . . . Y ,,.,N'" ß ~ /"f I
APPR DAT§ 33. Seabed condition survey (If off-shore). . . . . . . . . . . . . I ^nJ6(':Ý N
l(/r'- ".7(/'(')2 34. Contact name/phone for weekly progress reports [exploratory 711 Y N
ANNULAR DISPOSAL 35. With proper cementing records, this plan -4
(A) will contain waste in a suitable receiving zone; . . . . . . . Y N ,,//
(B) will not contaminate freshwater; or cause drilling waste. .. Y ~~/ /LJlH ,
to surface; ~
(C) will not impair mechanical integrity of th. e well used for disposal; N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION:
RP#,'
SFD_
GEOLOGY
APPR
DATE
/?4-: ,-(4;;. "2-
~
WGA \t-iIJ k
r~1L
PROGRAM: Exp _ Dev~ Redrll)( Serv _ Wellbore seg _ Ann. disposal para req _
GEOLAREA q <; ò UNIT# if ç;. 5 (? ON/OFF SHORE ~~
RN
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
\~ N
. ¥.--N--
~_~ ¡J/Ar
-¥-N-
~y ~
N C- T D t1....
... N I\-¡?p~v e-ci s I (PIa 2- .
6f/N
~N/A-
lC>N
~ ~ Nt.£. ¡) "- '-<..1 (p v-> f-<' ,
l
~
(
Comments/Instructions:
COT
DTS 03/07/0è
JMH
')
)
Well History File
APPENDIX
Infornlation of detailed nature that is not
particularly gemlane to the Well Pennitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infomlation, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
c9œ~ lod
)
)
**** REEL HEADER ****
MWD
03/11/26
)J.-)<S{
BHI
01
LIS Customer Format Tape
RECEIVED
**** TAPE HEADER ****
MWD
03/11/26
DEC 11 2003
435828
01
Atæka Oii& G,fiS, Q>.n~.ICOmmÎ_n
Anellørase
2.375" CTK
*** LIS COMMENT RECORD ***
! !!!!!! !! !!! !!! !! !! Remark File Version 1.000
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! Extract File: Idwg.las
NVersion Information
VERSo
WRAP.
NWell Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 9901.5000:
STOP.FT 11226.5000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API . API NUMBER:
NParameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 02
TOWN.N 11N
RANG. 13E
PDAT. MSL
EPD .F 0
LMF . RKB
FAPD.F 57.1
DMF KB
EKB .F 57.1
EDF .F N/A
EGL .F 0.0
CASE.F 10010
OSl . DIRECTIONAL
OS2 . PRESSTEQ I
NRemarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data presented is Realtime data.
(4) The final wellbore (F-04A) was an open hole sidetrack off the original
wellbore (F-04APB1) at 10786' MD (8971' SSTVD)
(5) Baker Hughes Inteq utilized CoilTrak downhole tools and ADVANTAGE
surface system.
(6) Tools ran in the string included CCL, Electrical Disconnect and
1.20:
NO:
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration (Alaska), Inc.
F-04APB1
Prudhoe Bay Unit
70 deg 20' 7.875" N 148 deg 46' 1.527" W
North Slope
Alaska
Baker Hughes INTEQ
2.375" CTK
26-Feb-03
500292008970
Description
-------------------------------
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
Other Services Line 2
<:~
~~~~",f'v\ ~
Circulating sub, )Drilling Performance Sub (inner, )outer downhole
pressure, downhole weight on bit, downhole temperature), a Gamma and
Directional Sub, and an Orienting Sub with a near bit inclination sensor.
(7) The data presented here is final and has been depth shifted to a PDC
(Primary Depth Control) recorded by SWS on March 02, 2003.
(8) The interval from 11200' MD (8991' SSTVD) to 11226' MD (8991' SSTVD)
was not logged due to sensor bit offset at TD.
MNEMONICS:
GRAX -> Gamma Ray MWD-AAPI [MWD] (MWD-AAPI units)
ROPS -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth (SSTVD), feet
SENSOR OFFSETS:
RUN GAMMA
1 29.33 ft.
2 29.01 ft.
3 29.77 ft.
4 29.87 ft.
5 26.67 ft.
6 26.67 ft.
7 28.11 ft.
8 28.11 ft.
9 28.11 ft.
10 28.11 ft.
CURVE SHIFT DATA
OBSERVED, ACTUAL,
9908.17, 9907.13,
9916.28,9915.65,
9920.43, 9920.43,
9937.27, 9936.02,
9965.53, 9965.32,
9971.04, 9970.42,
9976.65, 9977.07,
10009.7, 10010.1,
10014.7, 10015.1,
10022.6, 10022.8,
10029, 10029.9,
10041.9, 10040.4,
10045.6, 10046.3,
10054.8, 10054.2,
10060.7, 10059.3,
10067.4, 10066.5,
10071.9, 10072.6,
10080.5, 10082.1,
10083.6, 10086.9,
10171.8, 10170.1,
10205.3, 10203.2,
10211.9, 10209,
10217.1, 10215.2,
10251.3, 10248.6,
10284, 10282.7,
10300.6, 10296.8,
10317.5, 10316.1,
10337.3, 10336.6,
10356, 10354.1,
10362, 10359.3,
10365.1, 10363,
10369.8, 10369.4,
10383.5, 10381.3,
10392.3, 10389,
10394.8, 10392.7,
10403.1, 10400.6,
10410.1, 10406.6,
10430.1, 10427,
10448.6, 10443.2,
10494.7, 10488.7,
10500.9, 10496.8,
10621.6, 10618.5,
10644.7, 10640.9,
10661.3, 10656.9,
10688, 10682.8,
10693, 10688.4,
10758.7, 10753.9,
10780.5, 10778.8,
EOZ
END
DIRECTIONAL
30.18 ft.
29.86 ft.
30.62 ft.
30.72 ft.
27.52 ft.
27.52 ft.
27.03 ft.
27.03 ft.
27.03 ft.
27.03 ft.
DISPLACEMENT
-1.03906
-0.623047
o
-1.24707
-0.208008
-0.623047
0.415039
0.416016
0.416016
0.207031
0.832031
-1. 45508
0.624023
-0.624023
-1. 4541
-0.831055
0.624023
1.66309
3.3252
-1. 66309
-2.07812
-2.90918
-1. 87012
-2.70117
-1.24707
-3.74121
-1. 45508
-0.623047
-1. 87012
-2.70117
-2.07812
-0.415039
-2.28613
-3.3252
-2.07812
-2.49316
-3.5332
-3.11719
-5.40332
-6.02637
-4.15625
-3.11719
-3.74023
-4.36328
-5.19531
-4.57129
-4.7793
-1. 68066
')
)
Tape Subfile: 1
125 records...
Minimum record length:
Maximum record length:
10 bytes
132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
mwd.xtf
150
BP Exploration (Alaska) Inc.
F-04APB1
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
! !!!!! !!! !!! !!!! !!! Remark File Version 1.000
The data presented here is final and has been depth shifted
to a PDC (Primary Depth Control) recorded by SWS, 02-Mar-03
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR
ROP
GR
ROP
GRAX
ROPS
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
Size Length
1
2
GR
ROP
MWD
MWD
68
68
1
1
AAPI
F/HR
4
4
4
4
-------
8
Total Data Records:
32
Tape File Start Depth
9904.000000
Tape File End De~ )
Tape File Level Spacing
Tape File Depth Units
11226.000000
0.500000
)
feet
**** FILE TRAILER ****
Tape Subfile: 2 41 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
raw.xtf
150
BP Exploration (Alaska)
F-04APBl
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
! !!!!!!!!!! !! !! !! !! Remark File Version 1.000
This file contains the raw-unedited field data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX
ROPS
GRAX
ROPS
GRAX
ROPS
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
FRAME SPACE = 0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units Size Length
1 GRAX MWD 68 1 AAPI 4 4
2 ROPS MWD 68 1 F/HR 4 4
-------
8
Total Data Reco.
'}
32
)
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9905.000000
11226.000000
0.500000
feet
**** FILE TRAILER ****
Tape Subfile: 3 41 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
03/11/26
435828
01
**** REEL TRAILER ****
MWD
03/11/26
BHI
01
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
Tape Subfile 1 is type: LIS
Tape Subfile 2 is type: LIS
DEPTH GR ROP
9904.0000 85.2290 0.0000
9904.5000 98.8131 6.2245
9950.0000 26.3130 38.5745
10000.0000 24.6686 25.2309
10050.0000 33.7705 11. 0728
10100.0000 19.9490 10.2074
10150.0000 22.3322 21. 0957
10200.0000 24.5578 35.2911
10250.0000 38.0689 22.6330
10300.0000 14.4542 24.2355
10350.0000 34.1748 19.6657
10400.0000 39.8066 33.1842
10450.0000 55.0560 13.5821
10500.0000 34.0483 35.6964
10550.0000 37.1414 62.3651
10600.0000 40.1828 126.9677
10650.0000 64.9965 188.8174
10700.0000 49.4623 162.9534
10750.0000 34.0098 130.2158
10800.0000 43.1096 116.6965
10850.0000 67.7013 107.5280
10900.0000 133.9734 46.9970
10950.0000 131. 0811 42.2371
11000.0000 113.5017 9.0254
11050.0000 83.0927 85.5874
11100.0000 46.5114 111.8864
11150.0000 ).0910 96.4796 )
11200.0000 -999.2500 104.2845
11226.0000 -999.2500 -999.2500
Tape File Start Depth 9904.000000
Tape File End Depth 11226.000000
Tape File Level Spacing 0.500000
Tape File Depth Units feet
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
9905.0000 85.2290 0.0000
9905.5000 98.6285 6.1200
9950.0000 26.4770 39.2000
10000.0000 21.3233 25.4500
10050.0000 30.9435 8.4800
10100.0000 24.7591 4.5400
10150.0000 20.9798 24.5400
10200.0000 24.4156 26.5600
10250.0000 19.2619 6.6600
10300.0000 21.1826 26.6100
10350.0000 21.1826 27.0000
10400.0000 28.2142 61. 2900
10450.0000 -999.2500 -999.2500
10500.0000 29.6205 21. 7600
10550.0000 35.2458 53.5600
10600.0000 32.4331 111.1900
10650.0000 68.9973 170.8000
10700.0000 -999.2500 162.6000
10750.0000 -999.2500 115.1700
10800.0000 50.2300 141. 9500
10850.0000 71.1100 87.9700
10900.0000 138.4700 44.8700
10950.0000 139.9500 16.3000
11000.0000 114.6500 5.8300
11050.0000 73.9500 75.1800
11100.0000 45.9600 119.5700
11150.0000 100.9100 119.5800
11200.0000 -999.2500 117.7400
11226.0000 -999.2500 88.6400
Tape File Start Depth 9905.000000
Tape File End Depth 11226.000000
Tape File Level Spacing 0.500000
Tape File Depth Units feet
Tape Subfile 4 is type: LIS
)
)
ðOd~\OÔ
i .
**** REEL HEADER ****
MWD
03/09/23
J) I If (
BHI
01
LIS Customer Format Tape
**** TAPE HEADER ****
MWD
03/09/23
435828
01
2.375" CTK
*** LIS COMMENT RECORD
***
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
~Version Information
VERSo
WRAP.
~Well Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 9904.0000:
STOP.FT 11206.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API . API NUMBER:
~Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 02
TOWN.N 11N
RANG. 13E
PDAT. MSL
EPD .F 0
LMF . RKB
FAPD.F 57.1
DMF KB
EKB .F 57.1
EDF .F N/A
EGL .F 0.0
CASE.F 10010
OSl . DIRECTIONAL
OS2 . PRESSTEQ I
~Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data presented is Realtime data.
(4) The final wellbore (F-04A) was an open hole sidetrack off the original
wellbore (F-04APBl) at 10786' MD (8971' SSTVD)
(5) Baker Hughes Inteq utilized CoilTrak downhole tools and ADVANTAGE
surface system.
(6) Tools ran in the string included CCL, Electrical Disconnect and
Remark File Version 1.000
Extract File: ldwg.las
1. 20:
NO:
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration (Alaska), Inc.
F-04A
Prudhoe Bay Unit
70 deg 20' 7.875" N 148 deg 46' 1.527" W
North Slope
Alaska
Baker Hughes INTEQ
2.375" CTK
27-Feb-03
500292008901
Description
-------------------------------
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
casing Depth
Other Services Line 1
Other Services Line 2
~~Dm~
'I
sensor.
Circulati. )SUb, a Drilling Performance Sub ~~kr and outer downhole
pressure, downhole weight on bit, downhole temperature), a Gamma and
Directional Sub, and an Orienting Sub with a near bit inclination
(7) The data presented here is final and has been depth shifted to a PDC
(Primary Depth Control) recorded by SWS on March 02, 2003.
(8) The interval from 11179' MD (8861' SSTVD) to 11206' MD (8862' SSTVD)
was not logged due to sensor bit offset at TD
MNEMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWÐ-API units)
ROPS -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth (SSTVD), feet
SENSOR OFFSETS:
RUN GAMMA
1 29.33 ft.
2 29.01 ft.
3 29.77 ft.
4 29.87 ft.
5 26.67 ft.
6 26.67 ft.
7 28.11 ft.
8 28.11 ft.
9 28.11 ft.
10 28.11 ft.
11 26.04 ft.
12 27.90 ft.
13 28.11 ft.
CURVE SHIFT DATA
OBSERVED, ACTUAL,
9908.17, 9907.13,
9916.28, 9915.65,
9920.43, 9920.43,
9937.27, 9936.02,
9965.53, 9965.32,
9971.04, 9970.42,
9976.65, 9977.07,
10009.7, 10010.1,
10014.7, 10015.1,
10022.6, 10022.8,
10029, 10029.9,
10041.9, 10040.4,
10045.6, 10046.3,
10054.8, 10054.2,
10060.7, 10059.3,
10067.4, 10066.5,
10071. 9, 10072.6,
10080.5, 10082.1,
10083.6, 10086.9,
10171.8, 10170.1,
10205.3, 10203.2,
10211.9, 10209,
10217.1, 10215.2,
10251.3, 10248.6,
10284, 10282.7,
10300.6, 10296.8,
10317.5, 10316.1,
10337.3, 10336.6,
10356, 10354.1,
10362, 10359.3,
10365.1, 10363,
10369.8, 10369.4,
10383.5, 10381.3,
10392.3, 10389,
10394.8, 10392.7,
10403.1, 10400.6,
10410.1, 10406.6,
10430.1, 10427,
10448.6, 10443.2,
10494.7, 10488.7,
10500.9, 10496.8,
10621.6, 10618.5,
10644.7, 10640.9,
10661.3, 10656.9,
10688, 10682.8,
10693, 10688.4,
DIRECTIONAL
30.18 ft.
29.86 ft.
30.62 ft.
30.72 ft.
27.52 ft.
27.52 ft.
27.03 ft.
27.03 ft.
27.03 ft.
27.03 ft.
24.96 ft.
26.82 ft.
27.03 ft.
DISPLACEMENT
-1. 03906
-0.623047
o
-1.24707
-0.208008
-0.623047
0.415039
0.416016
0.416016
0.207031
0.832031
-1. 45508
0.624023
-0.624023
-1. 4541
-0.831055
0.624023
1. 66309
3.3252
-1. 66309
-2.07812
-2.90918
-1. 87012
-2.70117
-1.24707
-3.74121
-1.45508
-0.623047
-1.87012
-2.70117
-2.07812
-0.415039
-2.28613
-3.3252
-2.07812
-2.49316
-3.5332
-3.11719
-5.40332
-6.02637
-4.15625
-3.11719
-3.74023
-4.36328
-5.19531
-4.57129
· "
1075 8 . 7, 1 075 '. J
10793.3, 10792.2,
10800.3, 10799.3,
10826.1, 10822.1,
10830, 10826.5,
10848.2, 10843.3,
10858.4, 10854.9,
10875.5, 10869.9,
10880.9, 10875.7,
10895.8, 10891.7,
10910.4, 10905,
10929.3, 10924.9,
10960.8, 10957.9,
10990.4, 10984.8,
10998.5, 10992.5,
11004.3, 10998.5,
11027.4, 11021.2,
11042.4, 11036.6,
11067.6, 11061.4,
11101.2, 11094.4,
11111.2, 11104.1,
11120.1, 11114.5,
BASE CURVE: GROH,
Tape Subfile: 1
Minimum record length:
Maximum record length:
**** FILE HEADER ****
MWD .001
1024
-4.7793
-1. 03906
-1. 03906
-3.94824
-3.5332
-4.9873
-3.5332
-5.61035
-5.19531
-4.15625
-5.40332
-4.36426
-2.90918
-5.61035
-6.02637
-5.81934
-6.23438
-5.81836
-6.23438
-6.8584
-7.06543
-5.61133
OFFSET CURVE: GRCX
)t
147 records...
14 bytes
132 bytes
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
mwd.xtf
150
BP Exploration (Alaska) Inc.
F-04A
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
! !!!!!!! !!! !!!!!!!! Remark File Version 1.000
The data presented here is final and has been depth shifted
to a PDC (Primary Depth Control) recorded by SWS, 02-Mar-03
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR
ROP
GR
ROP
GRAX
ROPS
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per )cord is:
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
84
)
1
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 F/HR
Size Length
4 4
4 4
-------
8
Total Data Records:
32
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9904.000000
11206.000000
0.500000
feet
**** FILE TRAILER ****
Tape Subfile: 2 41 records...
Minimum record length:
Maximum record length:
18 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
raw.xtf
150
BP Exploration (Alaska)
F-04A
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
! !!!! !!!!!!! !!!!!!! Remark File Version 1.000
This file contains the raw-unedited field data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GRAX
ROPS
GRAX
ROPS
GRAX
ROPS
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is:
Datum Frame Size is:
o
12 bytes
ROP
GR
DEPTH
9904.0000
9904.5000
0.0000
6.2268
85.2290
98.8131
Tape Subfile 2 is type: LIS
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
132 bytes
132 bytes
Minimum record length:
Maximum record length:
2 records...
Tape Subfile: 4
BHI
01
**** REEL TRAILER ****
MWD
03/09/23
435828
01
**** TAPE TRAILER ****
MWD
03/09/23
54 bytes
4124 bytes
Minimum record length:
Maximum record length:
40 records...
Tape Subfile: 3
**** FILE TRAILER ****
feet
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9905.000000
11206.000000
0.500000
31
Total Data Records:
8
-------
4 4
4 4
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRAX MWD 68 1 AAPI
2 ROPS MWD 68 1 F/HR
Size Length
0.500 * F
FRAME SPACE =
1
is:
Logging direction is ln (value=
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is:
One depth per frame (value= 0)
Datum Specification Block Sub-type
84
)
255)
. .
9950.0000 }3130 38.5732 )
10000.0000 24.6686 25.2307
10050.0000 33.7705 11. 0688
10100.0000 19.9490 10.2109
10150.0000 22.3322 21.0995
10200.0000 24.5578 35.2896
10250.0000 38.0689 22.6293
10300.0000 14.4542 24.2350
10350.0000 34.1748 19.6623
10400.0000 39.8066 33.1834
10450.0000 55.0560 13.5818
10500.0000 34.0483 35.6967
10550.0000 37.1414 62.3664
10600.0000 40.1828 126.9680
10650.0000 64.9965 188.8141
10700.0000 49.4623 162.9508
10750.0000 34.0098 130.2156
10800.0000 101.1091 44.8214
10850.0000 144.4690 62.3031
10900.0000 77.1421 66.0067
10950.0000 56.5751 98.1149
11000.0000 52.8295 76.9657
11050.0000 157.2324 7.2644
11100.0000 115.0526 55.0502
11150.0000 113.6213 29.3741
11200.0000 -999.2500 44.6310
11206.0000 -999.2500 -999.2500
Tape File Start Depth 9904.000000
Tape File End Depth 11206.000000
Tape File Level Spacing 0.500000
Tape File Depth Units feet
, ')
) )
Tape Subfile 3 is type: LIS
DEPTH GRAX ROPS
9905.0000 85.2290 0.0000
9905.5000 98.6285 6.1224
9950.0000 26.4770 39.2019
10000.0000 21.3233 25.4481
10050.0000 30.9435 8.4750
10100.0000 24.7591 4.5393
10150.0000 20.9798 24.5414
10200.0000 24.4156 26.5633
10250.0000 19.2619 6.6550
10300.0000 21.1826 26.6062
10350.0000 21.1826 26.9991
10400.0000 28.2142 61.2886
10450.0000 -999.2500 -999.2500
10500.0000 29.6205 21. 7562
10550.0000 35.2458 53.5606
10600.0000 32.4331 111.1920
10650.0000 68.9973 170.8036
10700.0000 -999.2500 162.6047
10750.0000 -999.2500 115.1652
10800.0000 84.7653 44.4241
10850.0000 115.9035 16.8052
10900.0000 133.5578 5.8825
10950.0000 50.2389 85.9009
11000.0000 60.1465 39.9382
11050.0000 139.3946 74.9388
11100.0000 108.9233 27.9898
11150.0000 138.9052 66.8668
11200.0000 -999.2500 34.5955
11206.0000 -999.2500 44.0677
Tape File Start Depth 9905.000000
Tape File End Depth 11206.000000
Tape File Level Spacing 0.500000
Tape File Depth Units feet
I ;.
)
)
I
Tape Subfile 4 is type: LIS