Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-023 ) ) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~03 - O~?þ Well History File Identifier Organizing (done) o Two-sided 1111111111111111111 D Rescan Needed [ ~ RESCAN DIGITAL DATA OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Color Items: D Greyscale Items: D Diskettes, No. D Other, NolType: o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: Scanning Preparation ~. x 30 = &0 o Other:: ~ Date:4 ~~ ~ Isl Y11...') I - Date: tf (}.9 os- 151 V'1D I + &0 = --OTA~ PAGES <60 (Count does not i clude cover sheet) V\ A_ Yì Date: if ::uJ D"!::'- Isl , v£-, ,'"'7, I . BY: Helen ~aria J. Project Proofing BY: Helen ~_ BY: Helen ~ria ): Production Scanning Stage 1 Page Count from Scanned File: 15 I (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: 0f'.S r NO Helen( Maria) Date:lf d-fI, DS Isf mP If NO in stage 1 page(s) discrepancies were found: YES NO BY: Stage 1 BY: Helen Maria Date: 151 I II IIII II I Date: 151 Quality Checked 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned BY: Helen Maria Comments about this file: • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 ` i;AN DFEB23 4 201 December 30, 2011 Mr. Tom Maunder c 1O3 Alaska Oil and Gas Conservation Commission S _ f D— 333 West 7 Avenue f ' ` P Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of MPS -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator . • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) MPS -Pad 10/11/2011 Corrosion • Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal MPS -01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 , 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011 .- "'�j MPS -12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS-13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 7/29/2011 MPS-17 2021730 50029231150000 Open Flutes - Treated MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009 MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011 MPS-23 2021320 50029230980000 Open Flutes - Treated MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011 MPS -25 2021030 50029230890000 Open Flutes - Treated MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS-27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS-28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011 MPS -29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS -32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011 MPS-33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS-37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011 MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011 MPSB -04 _ 500299990799 0.6 NA 0.6 NA 3.4 _ 7/30/2011 i ~ --,--.~ ~s ~.. ~« -- ~ i o3io~ zoos DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\C~rPgs_Inserts\Microfilm Marker.doc . . ,,_., f~~,~_ -~~- ..y WELL LOG TRANSlVlITT AL To: State of Alaska Alaska Oil and Gas Conservation Comrn. Attn.: Librarian 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 November 13, 2006 RE: MWD Formation Evaluation Logs: MPK-09, MPS-12 PB1 L1, MPI-13, MPS-18 PBl. - - - The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 MPK-09: ÐO~- 01'-/ -tf: /439'Zr Digital Log Images: 1 CD Rom 50-029-23247-00 MPS-12_PB1_L1: Q6"3 -og"3 ù 14401 ( 903 -Ode..¡ tJ /LI'ID'd. Digital Log Images: 1 CD Rom 50-029-23133-00, 70, 60 MPI-13: U:t~ 8öl -ö-=t~ ':t 'IL{3D¡C) Digital Log Images: 1 CD Rom 50-029-23012-00 MPS-18_PB1: UTC- dÖ'd -''è)<-tQ I:Ì )'-I'-/DO Digital Log Images: 50-029-23133-00, 70 1 CD Rom scANNED rEB 0 1 2007 to e e WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7'h Avenue, Suite 100 Anchorage, Alaska 99501 Febmary 20,2004 ! 3Lp / 0 RE: MWD Formation Evaluation Logs: MPS-12 & MPS-12 PBl, AK-MW-2309935 MPS-12: Digital Log Images: 50-029-23139-00 cQ03-DÐ--3 1 CD Rom MPS-12 PBl: Digital Log Images: 50-029-23139-70 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 ~ Date: r!) I;) ~ I Ole; Signed!lQJ )-ttaa.âiLI~ C ð ) 11~1~~{J(~ DATA SUBMITTAL COMPLIANCE REPORT 4/1/2005 Permit to Drill 2030230 Well Name/No. MILNE PT UNIT SB 5-12 Operator BP EXPLORATION (ALASKA) INC Jì~ (.¡,,¿ À' r:;.h ~~. ~ API No. 50-029-23139-00-00 MD 4298 ~. Completion Date 3/13/2003 / Completion Status 8460 .../ 1VD -----~ --- ----- REQUIRED INFORMATION Mud Log No Samples No ------- DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, ABI, IFRlCASANDRA Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number ~~pt~~ ~ Rpt ¡ ~ ~RPt ¡ Rpt ð-fD D ~D C+-yr;t '-it Rpt I._~_~._---- Log Log Scale Media Run No 1 Name LIS Verification Directional Survey Directional Survey LIS Verification Directional Survey LIS Verification LIS Verification Directional Survey Directional Survey Ó*648 41'647 Well Cores/Samples Information: Name Interval Start Stop Received Sent ADDITIONAL INFORMATION Well Cored? Y G!) Chips Received? ~ Daily History Received? Formation Tops Analysis Received? ~. -- ----------- - -----.-- Comments: 1-01L Current Status 1-01L UIC N Directional Survey X' y"LA- (data taken from Logs Portion of Master Well Data Maint) Interval ) OH/ - Start Stop CH Received Comments 39 8405 Open 4/29/2003 882 8727 Open 4/22/2003 PB1 MWD 882 8727 Open 4/22/2003 PB1GYRO 39 8673 Open 4/29/2003 PB1 882 8727 Open 4/22/2003 PB1 39 8673 Open 4/29/2003 PB1 39 8405 Open 4/29/2003 8034 8460 Open 4/22/2003 MWD 8034 8460 Open 4/22/2003 Sample Set Number Comments -- Ô)N ,®N DATA SUBMITTAL COMPLIANCE REPORT 4/1/2005 Permit to Drill 2030230 Well Name/No. MILNE PT UNIT SB S-12 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23139-00-00 MD 8460 TVD 4298 h=0n Date 3/13/2003 Completion Status . 1-01L Current Status 1-01L UIC N --------- -- Compliance Reviewed By: _ Date: ) L.( tr N-M' ¡r- -.- . .------- .'-' :---- ) ) , ~03-Q:)3 II (Pit WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation COmIll. Attn.: Lisa Weepie 33 3 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 April 18,2003 RE: MWD Formation Evaluation Logs MPS-12 PBI, 1 LIS formatted Disc with verification listing. API#: 50-029-23139-70 AK-MW-2309935 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 Date: BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-I 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 '~ RECEIVED APR 2 9 2003 AJaaira Of; & G ~~ CoIIImieeiøn ~ ) ) d D3- ~3 I ! Co'!7 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 April 18, 2003 RE: MWD Formation Evaluation Logs l\1PS-12, AK-MW-23 0993 5 1 LIS formatted Disc with verification listing. API#: 50-029-23139-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Sign~(Á¥ RECEIVED APR 2 9 2003 Afaaka Of: & Gas Cons. Co~ Anchorage ''''''~n ) ,~ J STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well 181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator .~·:iífj· ¡, 7. Permit Number BP Exploration (Alaska) Inc. g. ~Y~\~::>'=3i 203-023 3 Address "'~-~'--~"'-'-'.._-.._,\\~." I: 8. API Number . \, ," ,'.', ~, P.O. Box 196612, Anchorage, Alaska 99519-6612' ~ "'.;<.t5~.' .. 50- 029-23139-00 4. Location of well at surface ' " '"'' ,. " ", ",' 9. Unit or Lease Name 3334' NSL, 93' WEL, SEC. 12, T12N, R10E, UM X = 565917, Y = 6000002 Milne Point Unit At top of productive interval . 5031' NSL, 3080' WEL, SEC. 07, T12N, R11 E, UM At total depth 2351' NSL, 2912' WEL, SEC. 06, T12N, R11E,UM X = 567823, Y = 6004316 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff KBE = 72.1' ADL 380110 12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband. 2-26-2003 3-5-2003 3-13-2003 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 8460 4298 FT 8460 4298 FT 181 Yes 0 No 22. Type Electric or Other Logs Run MWD, GR RES, ABI, IFR/CASANDRA Classification of Service Well X = 567689, Y = 6001716 10. Well Number MPS-12 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) 23. CASING SIZE 20" 10-3/4" 7-5/8" 4-1/2" WT. PER FT. 92# 45.5# 29.7# 12.7# GRADE H-40 L-80 L-80 L-80 CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE Surface 112' 42" 35' 2241' 13-1/2" 33' 5780' 9-7/8" 5677' 8460' 6-1/8" CEMENTING RECORD 260 sx Arctic Set (Approx.) 566 sx Class 'L', 230 sx Class 'G' 125 sx Class 'L', 392 sx Class 'G' Uncemented Slotted Liner AMOUNT PUllED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotter Liner MD TVD MD TVD 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2", 12.6#, L-80 5069' 3-1/2",9.2#, L-80 5069' - 5136' 5082' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 1800' Freeze Protected with 80 Bbls of Diesel 5785' - 8264' 4205' - 4284' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) March 17, 2003 Flowing Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl 3-23-2003 6 TEST PERIOD 2716 874 0 Flow Tubing Casing Pressure CALCULATED Oll-BBl GAs-McF WATER-BBl Press. 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. SUbmit~e E IVE 0 CHOKE SIZE GAS-Oil RATIO 322 Oil GRAVITY-API (CORR) No core samples were taken. _BfL l/~ APR 3 0 iUü3 APR 1 8 2003 Alaska Oil & Gas Cons. CommissiQn Anchorage Form 10-407 Rev. 07-01-80 OR: GINA- Submit In Duplicate ') 29. Geologic Markers Marker Name Measured True Vertical Depth Depth SBF2-NA 4790' 3955' SBF21 4801' 3960' Schrader Bluff NA Sand 4838' 3976' SBF1-NB 4850' 3981' SBF1-NBR 4859' 3985' SBD4-NC 4927' 4013' SBE41 4939' 4017' SBD2-NE 4967' 4029' SBE1-NF 5134' 4083' TSBD-OA 5304' 4120' TSBC 5511' 4158' TSBB-OB 5718' 4194' I, ,¡'J "II 31 . List of Attachments: ) 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. RECEIVED APR 1 8 2003 Alaska Oil & Gas Cons. Commission Anchorage S,umrT)ary ofD~ily Drilling Reports, Surveys and a Leak-Off Integrity Test Summary. 32. I ~erebY certify ~~~!J~.!qreQOi~~..iS t~~e ~o.~-correct to the best of my knowledge Signed SondL Stewman ~::/.- -. - -- Title Technical Assistant ~.___ \, eoi' c:::;:, ..{. ....__~...___ ,0 MPS-12 203-023 Well Number Permit No. I Approval No. INSTRUCTIONS Date (-:)~/- [U' ' 03 Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Steve Campbell, 564-4401 GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any a1íachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 28: If no cores taken, indicate 'none'. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. Form 10-407 Rev. 07-01-80 OR G,NAL ) ) Page 1 of 7 BP EXPLORATION Operations.·Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 2/26/2003 2/27/2003 MPS-12 MPS-12 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 From - To Hours Task Code NPT Phase 10:00 - 15:00 5.00 MOB P PRE 15:00 - 16:30 1.50 RIGU P PRE 16:30 - 19:00 2.50 RIGU P PRE 19:00 - 21 :30 2.50 DRILL P SURF 21 :30 - 22:00 0.50 DRILL P SURF 22:00 - 22:30 0.50 DRILL P SURF 22:30 - 23:00 0.50 RIGU P PRE 23:00 - 00:00 1.00 DRILL P SURF 00:00 - 00:30 0.50 DRILL P SURF 00:30 - 02:00 1.50 DRILL P SURF 02:00 - 20:00 18.00 DRILL P SURF 20:00 - 21 :00 1.00 CASE P SURF 21 :00 - 22:30 1.50 CASE P SURF 22:30 - 23:00 0.50 CASE P SURF 23:00 - 00:00 1.00 CASE P SURF 2/28/2003 00:00 - 01 :30 1.50 CASE P SURF 01 :30 - 02:00 0.50 CASE P SURF 02:00 - 03:30 1.50 CASE P SURF 03:30 - 06:30 3.00 CASE P SURF 06:30 - 07:00 0.50 CEMT P SURF 07:00 - 07:30 0.50 CEMT P SURF 07:30 - 11 :00 3.50 CEMT P SURF 11 :00 - 13:30 2.50 CEMT P SURF Start: 2/26/2003 Rig Release: 3/13/2003 Rig Number: Spud Date: 2/26/2003 End: Description of Operations Rig Down, Move Off MPS-18 & Move Rig to MPS-12. Spot Rig over Conductor. Skid Rig Floor. RIG ACCEPTED @ 15:00 hRS 2/26/2003. Fill Pits wI Mud & Water. RlU Rig Floor. NIU Diverter & Lines, Spot Tiger Tank, Rockwasher, Sperry Shack. Load Mud Bay. Pick Up & M/U BHA. CIO Stab. Sleave, Install MWD Electronics, Orient and adjust UBHO Sub Pre Spud Meeting Held by Co. Rep wI All Drilling Hands on Tour & all Service Co. Personnel. RlU HES Slick Line Sheaves for Gyro Surveys. Diverter Drill - Function Test. Witness waived by John Crisp, AOGCC. Check for Leaks in riser & Flow Line. CIO Conductor, Drill from 112' to 185'. 400 GPM @ 1000 psi. 50 RPM ART = 0.5 Hrs. Drill from 185' to 276'. 400 GPM @ 1030 psi. Stand Back HWDP & P/U 6 ea. DC's. Drill from 276' to 1600', 400 GPM @ 1800 psi. 1600' to 2250' 500 GPM @ 2700 psi. Torque = 8K P/U = 11 OK SIO = 108K ROT = 11 OK. RPM = 110, Motor = 75 AST = 0.75 Hrs. ART = 9.0 Hrs. Took 6 Gyro Surveys: Last @ 882'. Circulate Hole Clean 500 GPM @ 2300 psi.& 110 RPM. Wiper Trip to 760'. No Problems. Circulate Hole Clean - 500 GPM @ 2250 psi. & 110 RPM POH to BHA. No Drag - Hole in good shape. Lay Down BHA Clear Floor, P/U Landing Jt & Hanger - Make Dummy Run PJSM with all Hands. RlU to run 10 3/4" Casing Run 53 Jts. 45.5#, L-80, BTC Surface Casing. P/U Hanger & Landing Jt. Land Casing. Shoe @ 2240' Correct Displacement and filling pipe Throughout. Circulate Bottoms up - 6 BPM @ 400 psi.wl Franks Tool Reciprocate Pipe. RID Franks Tool M/U Cement Head. Circulate & Condition Mud for Cement Job. Cut Vis to 53 sec. Cut YP to 9. Circ @ 6 BPM Final Pressure - 180 psi. Turn over to Halliburton & Cement as Follows Pumping @ 5 to 7 BPM: Pump 5 Bbls Water Test Lines to 3500 psi. Pump 15 Bbls Water Mix & Pump 50 Bbls ALPHA Spacer, weighted to 10.2 ppg. Drop Bottom Plug Mix & Pump 421 Bbls.(566 sx) PERMAFROST "L" Slurry @ 10.7 ppg. Cement Returns to Surface: Mix & Pump 47 Bbls. (230 sx), Class "G" Premium Slurry @ 15.8 ppg. with 2% Calcium Chloride. Drop Top Plug Flush HOWCO Lines w/1 0 Bbls. water Switch to Rig and Displace wI 208 BBls Mud @ 7 Bbls/Min. Printed: 3/1712003 8:52:53 AM ) BP EXPLORATION Operations Summary Report Page 2 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-12 MPS-12 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/26/2003 Rig Release: 3/13/2003 Rig Number: Spud Date: 2/26/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 2/28/2003 11 :00 - 13:30 2.50 CEMT P SURF Reciprocating Casing Throughout Job. Slowed down to 2 BPM for last 10 BBls. Final pressure 420 psi. Bumped Plug wI 1420 psi. Check Floats - OK. Est. Total 254 BBls Cement to Surface. 13:30 - 15:00 1.50 CEMT P SURF Lay down landing Jt. & Flush Stack 15:00 - 16:30 1.50 CASE P SURF N/D Diverter & Associated Equipment 16:30 - 17:00 0.50 CASE P SURF N/U FMC GEN-5 Casing 1 Tubing Heads. Test Metal to Metal Seals to 1000 psi. 17:00 - 19:00 2.00 CASE P SURF N/U 135/8",5000 psi BOPE. 19:00 - 19:30 0.50 BOPSUR P SURF RIU to Test BOPE. 19:30 - 00:00 4.50 BOPSUR P SURF Test BOPE to 250 - 4000 psi. I Annular to 250 - 2500 psi. Witness of Test waived by John Crisp - AOGCC. 3/1/2003 00:00 - 00:30 0.50 CASE P SURF Install 1 0" ID wear Bushing. 00:30 - 03:00 2.50 CASE P SURF P/U & M/U BHA. Motor with Bend of 1.5 Deg in bind going into 103/4" 45.5 # Casing. Re-Adjust Motor Bend from 1.5 Deg to 1.22 Deg. Tight, but OK. M/U & RIH wI rest of BHA. 03:00 - 03:30 0.50 CASE P SURF CIO Elevators to 4". P/U 1 Jt. DP & Function test MWD - OK. 03:30 - 04:30 1.00 CASE P SURF RIH to 2061' Picking up 4" DP from Shed. 04:30 - 05:30 1.00 CASE P SURF Slip & Cut Drilling Line. Service Top Drive. 05:30 - 06:30 1.00 CASE P SURF RIU & Test 103/4" Casing to 2500 psi. for 30 minutes. 06:30 - 07:30 1.00 CASE P SURF Drill Shoe Track to 2240'. Very Clabbered Mud. 07:30 - 09:30 2.00 CASE P SURF Circulate & Condition Mud. 09:30 - 10:00 0.50 CASE P SURF Clean out Rat Hole to 2250 and Dr1l20' of new Hole to 2270'. 10:00 - 10:30 0.50 CASE P SURF CBU in preparation for FIT. 10:30 - 11 :30 1.00 CASE P SURF Perform FIT. Surface pressure of 270 psi. wI 9.2 ppg Mud = an EMW of 11.52 ppg @ 2240 TVD. 11 :30 - 00:00 12.50 DRILL P INT1 Directional Drill 9 7/8" Hole from 2270' to 4169'. @ 4169': 500 GPM @ 3300 psi. Torque = 9K RPM = 110 P/U = 115 K, SIO = 98K, ROT = 110K. AST = 4.75 Hrs. ART = 2.92 Hrs. 3/2/2003 00:00 - 01 :00 1.00 DRILL P INT1 Circulate Bottoms Up to clean Hole @ 500 GPM & 110 RPM. Pressure Dropped from 3300 psi to 3150 psi. 01 :00 - 18:00 17.00 DRILL P INT1 Directional Drill from 4169' to 5789'. 509 GPM @ 3420 psi. P/U = 124K, SIO = 95K, ROT = 113K Torque = 6.5K, 110 RPM AST = 8.5 Hrs. ART = 2.75 Hrs. 18:00 - 20:00 2.00 CASE P INT1 Circulate Lol Hi Vis. Sweep @ 509 GPM, Reciprocating Pipe @ 110 RPM. ICP = 3200 psi. , FCP = 3040 psi. 20:00 - 23:00 3.00 CASE P INT1 Pump out of Hole to Shoe @ 2240'.509 GPM, ICP = 3040 psi. FCP = 1620 psi. 23:00 - 00:00 1.00 CASE P INT1 RIH to 4650'. No obstuctions. 3/3/2003 00:00 - 00:30 0.50 CASE P INT1 RIH to 5789'. 00:30 - 02:00 1.50 CASE P INT1 CBU, Circulate Lo/Hi Vis Sweep. 509 GPM, Rotate @ 110 RPM, Reciprocate 90'. Pressure 3230 psi. 02:00 - 06:00 4.00 CASE P INT1 Pump out of Hole to Shoe @ 509 GPM. 06:00 - 06:30 0.50 CASE P INT1 CBU at Shoe @ 2240'. Good load of cuttings over shaker. 06:30 - 07:30 1.00 CASE P INT1 Pump Slug. POH to HWDP ( 724'). 07:30 - 09:30 2.00 CASE P INT1 UD BHA. 09:30 - 11 :00 1.50 CASE P INT1 Pull Wear Bushing, Install Test Plug. CIO Top Rams to 7 5/8". Test Bonnet Seals to 3500 psi. 11:00 -13:00 2.00 CASE P INT1 RlU to run 7 5/8" casing. Make dummy run wI Hgr & landing Jt. Printed: 3/1712003 8:52:53 AM ') ') BP EXPLORATION Operations Summary Report Page 3 of? Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-12 MPS-12 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/26/2003 Rig Release: 3/13/2003 Rig Number: Spud Date: 2/26/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 3/312003 11 :00 - 13:00 2.00 CASE P INT1 13:00 - 15:30 2.50 CASE P INT1 Run 7 5/8" Casing as per program to Shoe @ 2240'. 15:30 - 16:00 0.50 CASE P INT1 CBU - 6 BPM @ 420 psi. P/U = 11 OK, S/O = 106K 16:00 - 20:00 4.00 CASE P INT1 Run total 140 Jts, 7 5/8", 29.7#, L-80, BTC-M Casing to 5780'. precautionarily Wash last Jt to bottom. No Fill - Hole Slick. 20:00 - 20:30 0.50 CASE P INT1 RID Franks Tool I RlU Cement Head. 20:30 - 23:00 2.50 CASE P INT1 C&C Mud @ 6 BPM start @ 350 psi. - down to 300 psi wI YP at 14. P/U = 175K, S/O = 125K. 23:00 - 00:00 1.00 CEMT P INT1 Turn over to HOWCO and Cement as Follows: Pump 5 Bbls Water Test Lines to 3500 psi. Mix & Pump 30 Bbls ALPHA spacer weighted @ 10.2 ppg. Drop Bottom Plug Mix & Pump 49 Bbls ( 125 sx) Permafrost "E" slurry @ 12.0 ppg., yield 2.17 Mix & Pump 85 Bbls. (392 sx) Premium slurry, @ 15.6 ppg. yield 1.22 wI 3% KCL, 2% Cal-Seal, & 0.5% LAP-1. Both sluuries pumped @ 5-6 BPM. Drop Top Plug & chase w/1 0 Bbls water to clear HOWCO lines. Switch back to Rig & continue displacing w/252 Bbls MUd @ 7 BPM. FCP 590 psi. Bumped Plug wI 1600 psi. Floats OK 100 % Returns Throughout Job Reciprocated pipe Throughout Job. CIP - 00:15 Hrs. 3/4/2003 00:00 - 00:30 0.50 CEMT P INT1 Displacing wI 252 Bbls mud @ 7 BPM. FCP 590 psi. Bumped Plug wI 1600 psi. Floats OK 100 % Returns Throughout Job Reciprocated pipe Throughout Job. CIP - 00:15 Hrs. 00:30 - 01 :00 0.50 CEMT P INT1 Lay down cement head and landing jt. 01 :00 - 02:00 1.00 BOPSURP INT1 Install 7 5/8 packott assy. test to 5000 psi 02:00 - 03:30 1.50 BOPSUFP INT1 Change out top rams to 2718 x 5" variables, test door seals to 4,000 psi 03:30 - 04:00 0.50 BOPSURP INT1 Lay down test jt, install wear ring 04:00 - 06:00 2.00 CASE P INT1 Picking up BHA #3 , test MWD 06:00 - 09:30 3.50 CASE P INT1 Picking up 111 jts 4" pipe from pipe shed ,Trip in to 5,657' 09:30 - 10:30 1.00 CASE P INT1 Circ for csg test 10:30 -11 :30 1.00 CASE P INT1 Test csg to 3,500 psi for 30 min. good test 11 :30 - 13:00 1.50 DRILL P PROD1 Drill cement float @ 5,697' and shoe @ 5,779', 20 ft of new hole to 5,809' 13:00 - 14:00 1.00 DRILL P PROD1 Circ and FIT test MW 9.3, 400 psi, 4207 TVD, =11.0 EMW 14:00 - 00:00 10.00 DRILL P PROD1 Drilling 5809' to 6902' with 240 gals min,1850 psi, 80 rpms, 4-5 K bit wt., AST 1.5 ART 5.25, TO. 4K P/U 120K S/O 75K RfT 100K 3/5/2003 00:00 - 11 :00 11.00 DRILL P PROD1 Drilling 6902' to 8200' with 240 gals min, 2,000 psi, 80 rpms 11 :00 - 11 :30 0.50 DRILL P PROD1 Circ, while Geologist consults town 11 :30 - 17:30 6.00 DRILL P PROD1 Drilling 8200' to 8,727' with 240 gals min, 2,000 psi, 80 rpms drill out top of sand @ 8,160, drill to 8,727 no sand built to 97 degrees AST 3.25 ART 6.75 17:30 - 18:00 0.50 DRILL P PROD1 Circ 18:00 - 19:00 1.00 DRILL P PROD1 Pump out to 8054 to side track well 19:00 - 20:00 1.00 DRILL P PROD1 Side tracking well @ 8066 to 8,101 low side well 20:00 - 23:30 3.50 DRILL P PROD1 Drilling 8,101' to 8,460' TD with 240 gals min, 2,000 psi, 80 rpms, Cross Fault 8,380' ART 1.25, AST 1 TO 6K P/U 122K Printed: 311712003 6:52:53 AM ), ) BP EXPLORATION O.perationsSummary Report Page 4 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-12 MPS-12 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/26/2003 Rig Release: 3/13/2003 Rig Number: Spud Date: 2/26/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 3/5/2003 20:00 - 23:30 3.50 DRILL P PROD1 S/O 55k RIT 100k 23:30 - 00:00 0.50 DRILL P PROD1 Circ, with 240 gals min. 2,000 psi 100 rpms well started taking mud @ 50 bbls hr. slowed pumps to 200 gals min. 1500 psi well taking 25 to 30 bbls hr. lost total 25 bbls 3/6/2003 00:00 - 02:00 2.00 CASE P COMP Circ, with 240 gals min. 2000 psi 100 rpms well started taking mud @ 50 bbls hr. slowed pumps to 200 gals min. 1500 psi well taking 25 to 30 bbls hr., circ 2.5 bottoms up 02:00 - 05:00 3.00 CASE P COMP Pumping out of hole to shoe 5779, with 200 gals min 1500 psi spotting 40 bbl CaC03 with 35 ppb mud wt 9.5 in open hole while pumping to shoe. Total overall lost to well 1 00 bbls 05:00 - 05:30 0.50 CASE P COMP Monitor well, static 05:30 - 06:30 1.00 CASE P COMP Circ, bottoms up, no losses 06:30 - 07:30 1.00 CASE P COMP Cut drilling line 07:30 - 10:00 2.50 CASE P COMP Drop rabbit, POH 10:00 - 11 :00 1.00 CASE P COMP Stand back flex dC.,lay down MWD, Mud motor 11 :00 - 14:00 3.00 CASE P COMP Pick up slotted liner, 4.5 12.6# L-80 IBT, total of 5 solid jts and 60 slotted, 2 solid jts, baker 5.5 HMC liner hanger, Baker 5.5 x 7 5/8 ZXP liner top packer 14:00 -15:30 1.50 CASE P COMP Trip in with liner to 5,779 15:30 - 16:00 0.50 CASE P COMP Circ drill pipe Volume, get P/U and S/O wts 16:00 - 17:30 1.50 CASE P COMP Trip in with liner to 8,460' no problems 17:30 - 18:00 0.50 CASE P COMP Drop ball, circ, set liner hanger, packer and release liner, top of liner 5,677' 18:00 - 20:00 2.00 CASE P COMP Tripping out with liner setting tools, lay down same 20:00 - 00:00 4.00 CASE P COMP Pull wear ring, Testing BOPS and manifold 250-4,000 psi Annular 250-2500 psi, Witness of test was waiver by John Spaulding AOGCC, one repair of valve # 14 had to be changed out 317/2003 00:00 - 01 :30 1.50 CASE P COMP Testing BOP and manifold 250-4,000 psi Annular 250-2500 psi. Witness of test was waiver by John Spaulding AOGCC. Repair valve # 14, change out same. Install wear ring. 01 :30 - 05:30 4.00 STWHIP P PROD2 Picking up space out tail pipe and Whipstock and mills, MWD and 4 3/4" drill collars. 05:30 - 06:00 0.50 STWHIP P PROD2 Surface test MWD. 06:00 - 10:00 4.00 STWHIP P PROD2 Tripping in with Whipstock at 2 min. per stand, fill pipe every 10 stands. 10:00 - 10:30 0.50 STWHIP P PROD2 Orient Whipstock, set trip anchor with 18K down, set down, shear Whipstock pin. 10:30 - 15:30 5.00 STWHIP P PROD2 Milling window. Top of window at 5,270', bottom window 5,282', total depth 5,299', "OA" sand top 5,279'. 15:30 - 17:00 1.50 STWHIP P PROD2 Circulate, work 6 3/4" mills across window, pump sweeps. 17:00 - 19:30 2.50 STWHIP P PROD2 Tripping out with mills and lay down same 19:30 - 21 :30 2.00 DRILL P PROD2 Pick up BOP jet washer tool and super magnet, flush BOP. 21 :30 - 23:00 1.50 DRILL P PROD2 Pick up BHA #5, surface test MWD. 23:00 - 00:00 1.00 DRILL P PROD2 Tripping in with BHA #5 3/8/2003 00:00 - 01 :00 1.00 DRILL P PROD2 Tripping in with BHA #5 to window @ 5,270 01 :00 - 01 :30 0.50 DRILL P PROD2 Orient bit and slide thru window, no problems 01 :30 - 00:00 22.50 DRILL P PROD2 Drilling 5,299' to 8,056' with 240 gall min 2100 psi, 4-5k bit wt, 80 rpm.,Ta 5,500 AST 5, ART 7, 100 % sand 3/9/2003 00:00 - 00:30 0.50 DRILL P PROD2 Drilling 8,056' to 8,150 TD with 240 gall min 2100 psi, 4-5k bit wt, 80 rpm. 00:30 - 02:30 2.00 CASE P COMP Circ. Three bottoms up with 240 gals min. 2100 psi 100 rpms 02:30 - 05:30 3.00 CASE P COMP Pumping out to window with full drilling rate. pull across window Printed: 3/1712003 8:52:53 AM Ii'" " )1 BP EXPLORATION Operations Summary Report Page 5 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-12 MPS-12 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/26/2003 Rig Release: 3/13/2003 Rig Number: Spud Date: 2/26/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 3/912003 02:30 - 05:30 3.00 CASE P COMP with out pumping 05:30 - 06:30 1.00 CASE P COMP Circ. bottoms up @ 5211' 250 gals min. 06:30 - 08:30 2.00 CASE P COMP Tripping out 08:30 - 10:30 2.00 CASE P COMP Laying down BHA 10:30 -12:00 1.50 CASE P COMP Picking up Whipstock Retrieval BHA 12:00 - 13:30 1.50 CASE P COMP Tripping in to 5,200' 13:30 - 17:00 3.50 CASE P COMP Orientate MWD, attempt to hook Whipstock. Made several attempts, wash slot on slide, orient 360 deg make several attempts with no success. 17:00 - 19:00 2.00 CASE N DFAL COMP POH 19:00 - 22:00 3.00 CASE N DFAL COMP Trip out with BHA. Did not recover Whipstock, lay down MWD, 1 jt 3.5 hw., Whipstock hook. 22:00 - 23:30 1.50 CASE P COMP Slip and cut drill line, service top drive 23:30 - 00:00 0.50 CASE N DFAL COMP Change Whipstock retrieval BHA, picked up new hook with bend and change out 3 .5 HW jt to plain 3.5 jt. 3/10/2003 00:00 - 02:30 2.50 CASE N DFAL COMP Tripping in with new Whipstock hook BHA. 02:30 - 03:30 1.00 CASE N DFAL COMP Circ and Orient Whipstock hook, pump 10 bbls H20, wash Whipstock key way, latch Whipstock, jarred twice with 50,000 Ib overpull, came free. Gain 12,000 lb. string wt. 03:30 - 04:00 0.50 CASE N DFAL COMP Circ bottoms up. 04:00 - 07:30 3.50 CASE P COMP POH with Whipstock 07:30 - 11 :00 3.50 CASE P COMP Laying down whipstock, and tain pipe space out. 11 :00 - 11 :30 0.50 CASE P COMP PJSM, rig to run 4.5 liner 11 :30 - 15:00 3.50 CASE P COMP Picking up 4.5 liner 68 jts.12.6# L-80 IBT slotted and Baker 7" Hook Hanger 15:00 - 18:00 3.00 CASE P COMP Tripping in with liner, went thru window no problem, liner shoe 8,102', liner top 5,247'. Down wt 93,000 pick up wt. 125,000, hook window on second try. 18:00 - 19:00 1.00 CASE P COMP Drop ball and pump down @ 3 bbls min. pressure up to 2,600 psi and release liner. Pull up 10ft and sheared ball with 3,600 ps, pick up wt. 110,000# 19:00 - 19:30 0.50 CASE P COMP Circ bottons up and slug pipe 19:30 - 20:30 1.00 CASE N DFAL COMP Attempt to pull out and liner running tool, hanging up on diverter collet that should release wt 15,000# overpull working pipe up to 150,000 pick up, unhooked liner one time and re hook 20:30 - 00:00 3.50 CASE N DFAL COMP Circ 5 bbls min. 550 psi, Waiting and giving time for liner to wall stick. 3/11/2003 00:00 - 00:30 0.50 CASE N DFAL COMP Circ 5 bbls min. 550 psi, Waiting and giving time for liner to wall stick. 00:30 - 01 :00 0.50 CASE N DFAL COMP Trying to pull free from hanger, pull at 5,000# stages starting with 150,000# when we got to 165,000 the liner come unhooked and started coming up hole, re hook liner and picked up again and liner moved with 125,000 pull, rehook liner and circ. Called town 01 :00 - 05:00 4.00 CASE N DFAL COMP Pulling out of hole with liner, no problems 05:00 - 06:00 1.00 CASE N DFAL COMP Laying down, Baker hanger 06:00 - 10:30 4.50 CASE N DFAL COMP Wait on new Baker hanger 10:30 - 11 :30 1.00 CASE N DFAL COMP Picking up new Baker 7 5/8 hookwallliner hanger 11 :30 - 12:30 1.00 CASE N DFAL COMP Tripping hole 26 sds.drill pipe to top of window @ 5,270' 12:30 - 15:00 2.50 CASE N DFAL COMP Attempt to exit window, found window after 5th try, space shoe in middle of window and rot. with no indication of TQ spikes, worked pipe at 1/2 turns till exit on 5th try Printed: 3/1712003 8:52:53 AM ) ) BP EXPLORATION Operations Summary Report Page 6 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-12 MPS-12 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/26/2003 Rig Release: 3/13/2003 Rig Number: Spud Date: 2/26/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 3/11/2003 15:00 - 15:30 0.50 CASE N DFAL CaMP Trip into open hole with liner P/U wt 125K SIO 95K , hook liner @ 5,282' liner top @ 5,247', shoe @ 8,102' 15:30 - 16:30 1.00 CASE N DFAL CaMP Drop 29/32 ball, pumped down @ 1 112 bbl min. to ball seat, release liner with 2600 psi, free P/U wt 110,000, collet pulled with 130,000, shear ball with 3,850 psi, stand back one stand 16:30 - 19:30 3.00 CASE P CaMP Slug pipe tripping out, layed down excess pipe 19:30 - 21 :00 1.50 CASE P COMP Tripping in with DCs and laid down same 21 :00 - 22:30 1.50 CASE P CaMP Trip in hole open with 4" drill pipe 22:30 - 23:30 1.00 CASE N HMAN CaMP Pick up Halliburton 7 5/8 storm packer and hang drll pipe off @ 4982', to secure well. 23:30 - 00:00 0.50 CASE N CaMP Pull wear ring, Nipple down BOPs 3/12/2003 00:00 - 01 :30 1.50 CASE N CaMP Nipple down BOPs 01 :30 - 03:00 1.50 CASE N CaMP Nipple down Tubing spool and Orient tubing spool valves North and South, nipple tubing spool back up, test to 5000 psi for 10 min. Nipple up BOPS 03:00 - 04:30 1.50 CASE N CaMP Rig up and test choke lines and upper tubing spool flange to 250-4,000 psi 04:30 - 05:00 0.50 CASE N CaMP Rig up, pull Halliburton storm packer and laydown 05:00 - 05:30 0.50 CASE P CaMP Trip in to 5,237 05:30 - 08:00 2.50 CASE P CaMP Displace well with two hole volumes wI 8.8 brine follow by 9.2 brine with 25 gals per 100 bbls corrosion inhibitor, Rot. 120 rpms 10 bbls min. 08:00 - 11 :00 3.00 CASE P CaMP Monitor well, Tripping out, stand back 20 stands in derrick, lay down rest of pipe 11 :00 - 12:30 1.50 CASE P CaMP Slip and cut drill line 12:30 - 14:00 1.50 CASE P CaMP Finish laying down drill pipe, pull wear ring 14:00 - 15:00 1.00 RUNCOrvP COMP Rig up to run 4.5 completion, PJSM on running completion 15:00 - 23:30 8.50 RUNCOfvP CaMP Picking up 4.5 completion, 3.5 wire line entry guide @ 5135, XN nipple 3.5 @5131, 7518 x 4.5 Baker Premier Packer@ 5088, otis X nipple@ 5072, Phoenix jet pump gauge sensor@ 5060, XD sliding sleeve@ 5040, Phoenix pressure gauge@ 5026, 71 jts 4.5 12.6 L-80 IBT tubing, 4.5 KGB-2 GLM wI RP valve@ 2077, 49 jts 4.512.6 L-80 IBT tubing, FMC hanger Gen 6, I-wire clamps 68, P/U wt. 95K SIO wt.90K Block wt 50K 23:30 - 00:00 0.50 RUNCOfvP CaMP M/U hanger and landing jt., M/U I-Wire connect 3/13/2003 00:00 - 01 :30 1.50 RUNCOfvP CaMP M/U I-Wire connect, Land 4.5 completion, with TWC in place 01 :30 - 02:30 1.00 RUNCOfvP CaMP Test TWC with 1000 Psi, Blow down all service lines, choke lines, hole fill lines 02:30 - 03:30 1.00 RUNCOrvP CaMP Nipple down and set back bops 03:30 - 06:00 2.50 RUNCOfvP CaMP Nipple up Fmc 11" X 41/165,000 tubing head adapter test to 5,000 psi, nipple up CIW 4 1/165,000 psi tree, test tree to 5,000 psi 06:00 - 06:30 0.50 RUNCOfvP CaMP Pull TWC, pull with dry rod 06:30 - 08:00 1.50 RUNCOfvP CaMP Drop ball to set packer, pressure up to 4,000 psi set packer at 5,081' and test tubing, recorded press for 30 min., Bleed pressure back to 2,500, pressure up on annulus to 4,500 psi recorded press for 30 min., bleed tubing presure off and shear rp valve shear@ 2,500 psi 08:00 - 09:00 1.00 RUNCOfvP CaMP Pump 80 bbls diesel down annulus, taking returns up tubing 2.5 bbls min. 2500 psi diesed @ 1800 ft. 09:00 - 10:00 1.00 RUNCOfvP CaMP U-tube diesel F/annulus to tubing, shut in tubing=120psi-shut annulus 120psi Printed: 3/1712003 8:52:53 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date ) ') BP EXPLORATION Operations Summary Report MPS-12 MPS-12 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 2/26/2003 Rig Release: 3/13/2003 Rig Number: From- To Hours Task Code NPT Phase 3/13/2003 10:00 - 11 :00 11:00 -12:00 Page 7 of 7 Spud Date: 2/26/2003 End: Description of Operations 1.00 RUNCOM' 1.00 RUNCOM' COMP Rlu lubricator set CIW 4" type H BPV, rig down lubricator COMP Secure well, clean cellar, Rig released @ 12:003/13/2003 Printed: 3/1712003 8:52:53 AM Legal Name: MPS-12 Common Name: MPS-12 Test Date 3/1/2003 3/4/2002 FIT FIT Test Type Test Depth (TMD) 2,240.0 (ft) 5,809.0 (ft) BP . EXPLORA TION Leak-Off"esf$umm~.ry TestPepth (TVD) 2.240.0 (ft) 4,207.0 (ft) AMW 9.20 (ppg) 9.30 (ppg) SurfaèePressure 270 (psi) 400 (psi) Leak Off Pressure (BHP) 1,341 (psi) 2,432 (psi) Page 1 of 1 EMW 11.52 (ppg) 11.13 (ppg) .~ ~' Printed: 3/1712003 8:52:46 AM ) AOGCC Lisa Weepie 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPS-12 Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,460.00' MD (if applicable) '} 16-Apr-03 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ¡.,"~~:.;~ fo·"'·':: :,-,., "" ,~:=)., '-. ,:.... /\ ;., ~')~ :',..- - ~ :. \"".,', ....-\ ",' . ," 1- ~ ;'t' .. ~ .' ~ . .' . .; aù&-ðd3 ......,\: , . ,_. . ......~-, Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-12 -- Job No. AKZZ2309935, Surveyed: 5 March, 2003 Survey Report 15 April, 2003 Your Ref: API 500292313900 Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 .~_r Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid) Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True) Kelly Bushing: 72. 60ft above Mean Sea Level Elevation relative to Project V Reference: 72.60ft Elevation relative to Structure: 72.60ft Sr---t I""Y-SUI! DR fLLTN"G:--SEAvl c: es A Halliburton Company Survey Ref: svy1151 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12 Your Ref: API 500292313900 Job No. AKZZ2309935, Surveyed: 5 March, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft) 8034.07 86.970 25.820 4189.64 4262.24 3923.39 N 1742.60 E 6003940.87 N 567625.22 E 4291.40 Tie On Point 8066.00 86.970 25.860 4191.33 4263.93 3952.08 N 1756.50 E 6003969.69 N 567638.87 E 0.125 4323.28 Window Point 8084.57 85.240 25.750 4192.59 4265.19 3968.76 N 1764.56 E 6003986.44 N 567646.79 E 9.335 4341.81 8132.22 83.810 27.100 4197.13 4269.73 4011.24 N 1785.67 E 6004029.10 N 567667.52 E 4.118 4389.23 8179.76 84.000 26.690 4202.18 4274.78 4053.40 N 1807.05 E 6004071 .45 N 567688.53 E 0.946 4436.49 8228.93 83.570 29.330 4207.51 4280.11 4096.55 N 1830.01 E 6004114.80 N 567711 .10 E 5.409 4485.32 ~ 8277.12 84.310 29.120 4212.59 4285.19 4138.37 N 1853.40 E 6004156.82 N 567734.13 E 1.596 4533.14 8326.29 86.420 29.850 4216.57 4289.17 4181.03 N 1877.52 E 6004199.69 N 567757.87 E 4.539 4582.03 8370.90 86.300 29.660 4219.40 4292.00 4219.68 N 1899.62 E 6004238.54 N 567779.62 E 0.503 4626.42 8391.21 86.420 30.050 4220.69 4293.29 4237.26 N 1909.71 E 6004256.21 N 567789.56 E 2.005 4646.63 8460.00 86.420 30.050 4224.98 4297.58 4296.68 N 1944.09 E 6004315.93 N 567823.41 E 0.000 4715.07 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 25.500° (True). Magnetic Declination at Surface is 25.583°(26-Feb-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 8460.00ft., The Bottom Hole Displacement is 4716.03ft., in the Direction of 24.345° (True). '--- 15 April, 2003 - 11:10 Page2of3 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12 Your Ref: API 500292313900 Job No. AKZZ2309935, Surveyed: 5 March, 2003 BP EXPLORA nON (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 8034.07 8066.00 8460.00 4262.24 4263.93 4297.58 3923.39 N 3952.08 N 4296.68 N 1742.60 E 1756.50 E 1944.09 E Tie On Point Window Point Projected Survey - Survey tool program for MPS-12 Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 882.00 0.00 881.94 882.00 8460.00 881.94 Tolerable Gyro (MPS-12PB1 Gyro) 4297.58 AK-6 BP _IFR-AK (MPS-12PB1) - 15 April, 2003 - 11 :10 Page 3 of 3 DríllQuest 3.03.02.005 ) ) go 3~W3 16-Apr-03 AOGCC Lisa Weepie 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-12 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,460.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager &' ""'t ,¡;-" "'~'., ~'W" ~ '; f\'~~: :l:;.~;~ :1".,); .l:~~'.;; \ ,,!,·~'·'C) Attachment(s) ~ .~' r:~ ;:-) '. t.. ~ : ;J 3 :~: ~ .;,~ . ~~,;~\ / ;', , .~ ~. ", ....~ ~ ':1"'" .,' '" . Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-12 MWD '-' Job No. AKMW2309935, Surveyed: 5 March, 2003 Survey Report 15 April, 2003 Your Ref: API 500292313900 Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid) Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True) Kelly Bushing: 72. 60ft above Mean Sea Level Elevation relative to Project V Reference: 72.60ft Elevation relative to Structure: 72.60ft =¡ ...... '''''V-5LJr1 D'R I L-L IN G . nSER\/IC:~S A Halliburton Company Survey Ref: svy1152 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12 MWD Your Ref: API 500292313900 Job No. AKMW2309935, Surveyed: 5 March, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 8034.07 86.970 25.600 4189.64 4262.24 3912.97 N 1767.07 E 6003930.67 N 567649.79 E 4292.53 Tie On Point 8066.00 86.970 25.860 4191.33 4263.93 3941.69 N 1780.91 E 6003959.52 N 567663.37 E 0.813 4324.42 Window Point 8084.57 85.240 26.030 4192.59 4265.19 3958.35 N 1789.02 E 6003976.25 N 567671.33 E 9.361 4342.94 8132.22 83.810 27.500 4197.13 4269.73 4000.70 N 1810.38 E 6004018.78 N 567692.32 E 4.294 4390.36 8179.76 84.000 27.040 4202.18 4274.78 4042.72 N 1832.04 E 6004060.99 N 567713.60 E 1.042 4437.61 8228.93 83.570 29.970 4207.51 4280.11 4085.67 N 1855.36 E 6004104.15 N 567736.55 E 5.988 4486.42 -- 8277.12 84.310 29.640 4212.59 4285.19 4127.25 N 1879.18 E 6004145.94 N 567760.00 E 1.680 4534.20 8326.29 86.420 30.460 4216.57 4289.17 4169.67 N 1903.72 E 6004188.57 N 567784.16 E 4.602 4583.06 8370.90 86.300 30.350 4219.40 4292.00 4208.07 N 1926.25 E 6004227.16 N 567806.36 E 0.365 4627.41 8391.21 86.420 30.900 4220.69 4293.29 4225.51 N 1936.58 E 6004244.70 N 567816.53 E 2.766 4647.60 8460.00 86.420 30.900 4224.98 4297.58 4284.42 N 1971.83 E 6004303.92 N 567851.26 E 0.000 4715.95 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 25.500° (True). Magnetic Declination at Surface is 25.583°(26-Feb-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 8460.00ft., The Bottom Hole Displacement is 4716.40ft., in the Direction of 24.713° (True). 15 April, 2003 - 11:11 Page2of3 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12 MWD Your Ref: API 500292313900 Job No. AKMW2309935, Surveyed: 5 March, 2003 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 8034.07 8066.00 8460.00 4262.24 4263.93 4297.58 3912.97 N 3941.69 N 4284.42 N 1767.07 E 1780.91 E 1971.83 E Tie On Point Window Point Projected Survey - Survey tool program for MPS-12 MWD Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 882.00 0.00 881.94 882.00 8460.00 881.94 Tolerable Gyro (MPS-12PB1 Gyro) 4297.58 MWD Magnetic (MPS-12PB1 MWD) -- 15 April, 2003 - 11:11 Page 3 of 3 DrillQuest 3.03.02.005 ) ) ~O&Cb>3 16-Apr-03 AOGCC Lisa Weepie 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITVE Re: Distribution of Survey Data for Well MPS-12 PB1 GYRO Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' M D (if applicable) 0.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECE~'/ED APR 2 2 2003 A1aoka em & Gas Cons. Commission AoChofsge Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-12PB1 Gyro "--' Job No. 2309935, Surveyed: 5 March, 2003 Survey Report 15 April, 2003 Your Ref: API 500292313970 Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 . j -- Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid) Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True) Kelly Bushing: 72.60ft above Mean Sea Level Elevation relative to Project V Reference: 72.60ft Elevation relative to Structure: 72.60ft 5r'P............y-5LJr1 DFflLLíNG 'SEAVrC:es A Halliburton Company Survey Ref: svy1147 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 Gyro Your Ref: API 500292313970 Job No. 2309935, Surveyed: 5 March, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft) 0.00 0.000 0.000 -72.60 0.00 0.00 N 0.00 E 6000002.26 N 565917.32 E 0.00 Tolerable Gyro 150.00 0.200 210.000 77.40 150.00 0.23 S 0.13W 6000002.03 N 565917.19 E 0.133 -0.26 329.00 0.600 188.000 256.40 329.00 1 .43 S 0.42 W 6000000.83 N 565916.92 E 0.235 -1.47 419.00 0.750 180.000 346.39 418.99 2.48 S 0.48 W 5999999.77 N 565916.86 E 0.196 -2.45 601.00 1.000 173.000 528.37 600.97 5.25 S 0.29W 5999997.01 N 565917.08 E 0.149 -4.86 691.00 0.600 146.000 618.36 690.96 6.42 S 0.07 E 5999995.84 N 565917.45 E 0.599 -5.76 882.00 1.250 47.000 809.34 881.94 5.83 S 2.15 E 5999996.45 N 565919.52 E 0.769 -4.33 ----" All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 25.500° (True). Magnetic Declination at Surface is 25.583°(26-Feb-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 882.00ft., The Bottom Hole Displacement is 6.21ft., in the Direction of 159.725° (True). Survey tool program for MPS-12PB1 Gyro Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) "'-~./ 0.00 0.00 882.00 881.94 Tolerable Gyro 15 April, 2003 - 10:54 Page 2 of 2 DrillQuest 3.03.02.005 ') AOGCC Lisa Weepie 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPS-12 PB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,727.00' MD (if applicable) ') ao8-Ò~3 16-Apr-03 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5'- f,~. "~W-I\/~ -"-'- .....'"<:\ ~ '~F'" ij "í:\"",. 1/ t:U~ r .. )r '\.. .¿f~-' I., . [~ ','''''~'' ~ - ,,' APR 2 2 2003 ;~a$Ka ü¡-j &. Gas Cons. {))mmiækm ,Anchorage. ,. Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-12PB1 -' Job No. AKZZ2309935, Surveyed: 5 March, 2003 Survey Report 15 April, 2003 Your Ref: API 500292313970 Surface Coordinates: 6000002.26 H, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 --" Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid) Surface Coordinates relative to Structure: 31.03 H, 427.42 W (True) Kelly Bushing: 72. 60ft above Mean Sea Level Elevation relative to Project V Reference: 72.60ft Elevation relative to Structure: 72.60ft Sï ........ ''''''Y-SLJI'1 DArLL(NG^ 'slJæE:ívìces A Halliburton Company Survey Ref: svy1149 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 Your Ref: AP/500292313970 Job No. AKZZ2309935, Surveyed: 5 March, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 882.00 1.250 47.000 809.34 881.94 5.838 2.15 E 5999996.45 N 565919.52 E -4.33 AK-6 BP _IFR-AK 1009.08 0.440 43.110 936.41 1009.01 4.538 3.50 E 5999997.77 N 565920.86 E 0.639 -2.58 1105.25 0.570 63.720 1032.57 1105.17 4.048 4.18 E 5999998.25 N 565921.54 E 0.230 -1.85 1202.63 0.460 49.520 1129.95 1202.55 3.588 4.91 E 5999998.73 N 565922.26 E 0.172 -1.11 1298.35 0.250 40.460 1225.67 1298.27 3.178 5.34 E 5999999.14 N 565922.69 E 0.226 -0.56 1394.23 0.140 354.050 1321.55 1394.15 2.898 5.46 E 5999999.42 N 565922.81 E 0.192 -0.26 -" 1490.54 0.300 47.060 1417.86 1490.46 2.608 5.64 E 5999999.71 N 565922.98 E 0.252 0.08 1585.71 0.220 110.370 1513.02 1585.62 2.508 5.99 E 5999999.82 N 565923.33 E 0.296 0.33 1681.19 0.180 41.370 1608.50 1 681 . 1 0 2.45 8 6.26 E 5999999.87 N 565923.60 E 0.240 0.49 1776.70 0.220 332.830 1704.01 1776.61 2.178 6.28 E 6000000.14 N 565923.62 E 0.238 0.74 1872.22 0.270 245.340 1799.53 1872.13 2.108 5.99 E 6000000.21 N 565923.33 E 0.357 0.68 1968.42 0.520 241.040 1895.73 1968.33 2.418 5.40 E 5999999.90 N 565922.74 E 0.262 0.15 2062.53 0.440 260.850 1989.84 2062.44 2.678 4.67 E 5999999.63 N 565922.01 E 0.194 -0.40 2159.10 0.590 254.270 2086.40 2159.00 2.878 3.83 E 5999999.43 N 565921.17 E 0.167 -0.94 2183.42 0.670 248.360 2110.72 2183.32 2.958 3.57 E 5999999.34 N 565920.92 E 0.423 -1.13 2284.93 0.670 223.100 2212.23 2284.83 3.61 8 2.62 E 5999998.68 N 565919.97 E 0.289 -2.13 2380.59 0.140 146.820 2307.88 2380.48 4.11 8 2.30 E 5999998.17 N 565919.65 E 0.681 -2.72 2476.17 3.240 58.090 2403.41 2476.01 2.788 4.65 E 5999999.52 N 565922.00 E 3.390 -0.51 2572.63 6.750 56.840 2499.49 2572.09 1.76 N 11.72 E 6000004.12 N 565929.02 E 3.640 6.63 2668.57 13.230 60.160 2593.93 2666.53 10.32 N 25.97 E 6000012.81 N 565943.20 E 6.778 20.49 2765.21 21.020 61.630 2686.21 2758.81 24.08 N 50.86 E 6000026.78 N 565967.96 E 8.073 43.63 2859.48 23.800 62.160 2773.35 2845.95 41.00 N 82.56 E 6000043.98 N 565999.51 E 2.957 72.55 2954.96 27.390 61.770 2859.45 2932.05 60.39 N 118.96 E 6000063.70 N 566035.74 E 3.764 105.72 3050.70 33.450 59.150 2941.98 3014.58 84.36 N 161.05 E 6000088.04 N 566077.62 E 6.478 145.48 -- 3146.18 39.030 55.540 3018.96 3091.56 114.89 N 208.48 E 6000118.99 N 566124.77 E 6.255 193.45 3242.69 44.030 54.530 3091.19 3163.79 151.57 N 260.88 E 6000156.13 N 566176.85 E 5.227 249.12 3335.85 50.010 50.490 3154.69 3227.29 193.11 N 314.84 E 6000198.14 N 566230.44 E 7.158 309.84 3431.74 51 .000 50.840 3215.67 3288.27 240.01 N 372.07 E 6000245.54 N 566287.26 E 1.070 376.81 3529.51 51.750 51.490 3276.70 3349.30 287.91 N 431.57 E 6000293.96 N 566346.33 E 0.926 445.66 3625.06 54.210 51.110 3334.23 3406.83 335.60 N 491.10 E 6000342.19 N 566405.44 E 2.594 514.34 3721 .45 58.400 50.100 3387.69 3460.29 386.50 N 553.05 E 6000393.63 N 566466.94 E 4.433 586.95 3817.73 60.960 50.660 3436.29 3508.89 439.49 N 617.07 E 6000447.18 N 566530.49 E 2.706 662.34 3913.52 61.170 50.200 3482.64 3555.24 492.90 N 681.69 E 6000501.15 N 566594.63 E 0.474 738.36 4009.51 61.410 49.450 3528.75 3601.35 547.21 N 746.02 E 6000556.03 N 566658.48 E 0.729 815.07 4105.18 63.650 48.530 3572.88 3645.48 602.91 N 810.06 E 6000612.30 N 566722.03 E 2.492 892.92 15 April, 2003 - 11:10 Page2of6 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 Your Ref: API 500292313970 Job No. AKZZ2309935, Surveyed: 5 March, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft) 4201.63 63.860 48.840 3615.53 3688.13 660.02 N 875.03 E 6000669.98 N 566786.50 E 0.361 972.44 4298.98 63.250 50.600 3658.89 3731.49 716.37 N 941.52 E 6000726.92 N 566852.49 E 1.736 1051.93 4394.17 62.110 52.160 3702.58 3775.18 769.16N 1007.59 E 6000780.28 N 566918.09 E 1.885 1128.01 4490.28 62.370 53.030 3747.34 3819.94 820.82 N 1075.15 E 6000832.54 N 566985.19 E 0.845 1203.73 4585.60 63.300 52.980 3790.86 3863.46 871 .85 N 1142.88 E 6000884.17 N 567052.47 E 0.977 1278.95 _/ ! 4682.82 62.470 52.690 3835.17 3907.77 924.13 N 1211.84 E 6000937.05 N 567120.96 E 0.894 1355.82 4778.64 64.750 49.900 3877.76 3950.36 977.81 N 1278.80 E 6000991.32 N 567187.44 E 3.530 1433.09 4874.35 64.810 49.550 3918.55 3991.15 1033.78 N 1344.86 E 6001047.87 N 567253.01 E 0.337 1512.05 4970.28 67.180 48.720 3957.57 4030.17 1091.12 N 1411.13 E 6001105.79 N 567318.76 E 2.594 1592.33 5067.28 71.010 45.860 3992.18 4064.78 1152.58 N 1477.67 E 6001167.84 N 567384.76 E 4.814 1676.46 5161.36 77.810 42.930 4017.46 4090.06 1217.31 N 1540.99 E 6001233.13 N 567447.51 E 7.825 1762.14 5257.98 77.810 37.990 4037.87 4110.47 1289.15 N 1602.26 E 6001305.50 N 567508.14 E 4.997 1853.35 5354.57 78.820 31.540 4057.45 4130.05 1366.81 N 1656.15 E 6001383.63 N 567561.34 E 6.622 1946.65 5450.76 80.010 26.250 4075.13 4147.73 1449.56 N 1701.82 E 6001466.79 N 567606.28 E 5.546 2041.01 5546.34 80.890 21.330 4091.00 4163.60 1535.78 N 1739.82 E 6001553.34 N 567643.52 E 5.159 2135.19 5643.38 79.330 15.840 4107.68 4180.28 1626.35 N 1770.28 E 6001644.17 N 567673.18 E 5.800 2230.05 5725.09 79.260 10.480 4122.87 4195.47 1704.50 N 1788.56 E 6001722.48 N 567690.76 E 6.446 2308.45 5825.61 82.570 9.630 4138.74 4211.34 1802.22 N 1805.88 E 6001820.35 N 567707.22 E 3.397 2404.11 5875.34 91.230 5.170 4141.43 4214.03 1851.41 N 1812.26 E 6001869.59 N 567713.17 E 19.578 2451.25 5926.87 90.680 357.880 4140.57 4213.17 1902.88 N 1813.63 E 6001921.07 N 567714.09 E 14.185 2498.30 5970.87 90.430 353.100 4140.14 4212.74 1946.73 N 1810.17E 6001964.89 N 567710.24 E 10.878 2536.39 6019.31 89.320 350.060 4140.24 4212.84 1994.64 N 1803.08 E 6002012.73 N 567702.73 E 6.681 2576.58 6068.58 89.320 349.880 4140.83 4213.43 2043.15 N 1794.50 E 6002061.17 N 567693.72 E 0.365 2616.67 _/ 6117.86 89.010 350.110 4141.55 4214.15 2091.68 N 1785.94 E 6002109.62 N 567684.73 E 0.783 2656.78 6164.08 89.630 346.310 4142.10 4214.70 2136.91 N 1776.50 E 6002154.77 N 567674.89 E 8.330 2693.55 6218.56 89.690 346.370 4142.42 4215.02 2189.85 N 1763.63 E 6002207.59 N 567661.56 E 0.156 2735.79 6261.19 89.750 345.840 4142.63 4215.23 2231.23 N 1753.39 E 6002248.88 N 567650.95 E 1.251 2768.73 6310.64 89.440 345.870 4142.98 4215.58 2279.18 N 1741.31 E 6002296.72 N 567638.45 E 0.630 2806.81 6355.16 89.320 345.000 4143.46 4216.06 2322.27 N 1730.12 E 6002339.70 N 567626.87 E 1.973 2840.88 6404.44 89.380 344.280 4144.02 4216.62 2369.78 N 1717.06 E 6002387.10 N 567613.40 E 1 .466 2878.14 6449.01 90.620 344.370 4144.02 4216.62 2412.69 N 1705.02 E 6002429.91 N 567600.98 E 2.789 2911.69 6500.75 90.860 344.270 4143.35 4215.95 2462.50 N 1691.04 E 6002479.59 N 567586.56 E 0.503 2950.63 6545.95 91.850 344.500 4142.28 4214.88 2506.02 N 1678.88 E 6002523.00 N 567574.01 E 2.249 2984.67 6598.80 89.510 343.760 4141.65 4214.25 2556.85 N 1664.43 E 6002573.70 N 567559.12 E 4.644 3024.33 6642.48 89.630 344.710 4141.98 4214.58 2598.89 N 1652.56 E 6002615.63 N 567546.88 E 2.192 3057.16 15 April, 2003 - 11:10 Page 3 of 6 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 Your Ref: API 500292313970 Job No. AKZZ2309935, Surveyed: 5 March, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (tt) (tt) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft) 6690.52 89.510 343.630 4142.34 4214.94 2645.10 N 1639.45 E 6002661.73 N 567533.37 E 2.262 3093.23 6739.01 89.070 343.160 4142.94 4215.54 2691.57 N 1625.60 E 6002708.07 N 567519.10 E 1.328 3129.21 6787.71 89.320 344.140 4143.63 4216.23 2738.29 N 1611.89 E 6002754.67 N 567504.98 E 2.077 3165.48 6835.24 87.280 344.560 4145.04 4217.64 2784.04 N 1599.08 E 6002800.30 N 567491.76 E 4.382 3201.25 6886.21 85.990 343.990 4148.03 4220.63 2833.01 N 1585.29 E 6002849.15 N 567477.54 E 2.766 3239.52 6931.04 84.930 346.890 4151.58 4224.18 2876.26 N 1574.05 E 6002892.30 N 567465.93 E 6.868 3273.72 ~ 6979.66 85.050 349.440 4155.82 4228.42 2923.66 N 1564.12 E 6002939.61 N 567455.58 E 5.231 3312.23 7026.42 85.310 348.280 4159.75 4232.35 2969.38 N 1555.12 E 6002985.25 N 567446.17 E 2.534 3349.61 7079.00 84.930 348.650 4164.23 4236.83 3020.71 N 1544.64 E 6003036.48 N 567435.24 E 1.007 3391.43 7122.48 89.510 351 .430 4166.34 4238.94 3063.47 N 1537.13 E 6003079.18 N 567427.36 E 12.317 3426.80 7170.96 89.140 350.620 4166.91 4239.51 3111.35N 1529.57 E 6003126.99 N 567419.37 E 1.837 3466.76 7218.60 91.670 354.020 4166.57 4239.17 3158.55N 1523.21 E 6003174.13 N 567412.59 E 8.895 3506.62 7269.39 91.300 354.580 4165.25 4237.85 3209.07 N 1518.16E 6003224.61 N 567407.10 E 1.321 3550.05 7313.37 91.540 359.300 4164.16 4236.76 3252.96 N 1515.82 E 6003268.48 N 567404.37 E 10.743 3588.65 7366.11 89.570 0.420 4163.65 4236.25 3305.70 N 1515.69 E 6003321.21 N 567403.77 E 4.297 3636.20 7411 .48 88.460 3.220 4164.43 4237.03 3351.03 N 1517.13E 6003366.55 N 567404.81 E 6.638 3677.74 7462.06 87.220 5.450 4166.34 4238.94 3401.43 N 1520.95 E 6003416.98 N 567408.19 E 5.042 3724.87 7508.52 88.520 9.680 4168.07 4240.67 3447.44 N 1527.06 E 6003463.04 N 567413.89 E 9.519 3769.03 7557.08 87.340 12.350 4169.82 4242.42 3495.07 N 1536.33 E 6003510.75 N 567422.74 E 6.008 3816.01 7604.40 86.290 18.770 4172.45 4245.05 3540.56 N 1549.00 E 6003556.36 N 567435.01 E 13.727 3862.52 7651.38 88.830 24.400 4174.45 4247.05 3584.19 N 1566.26 E 6003600.13 N 567451.88 E 13.136 3909.32 7698.40 88.770 28.730 4175.44 4248.04 3626.22 N 1587.28 E 6003642.35 N 567472.53 E 9.208 3956.32 7747.58 88.700 28.310 4176.52 4249.12 3669.42 N 1610.75 E 6003685.76 N 567495.62 E 0.866 4005.41 7795.90 87.41 0 28.300 4178.16 4250.76 3711.94 N 1633.65 E 6003728.47 N 567518.15 E 2.670 4053.65 ~ 7844.90 87.280 28.200 4180.43 4253.03 3755.06 N 1656.82 E 6003771.79 N 567540.93 E 0.335 4102.54 7891.97 87.530 27.970 4182.57 4255.17 3796.54 N 1678.95 E 6003813.47 N 567562.70 E 0.721 4149.51 7938.73 87.400 26.830 4184.63 4257.23 3838.02 N 1700.45 E 6003855.13 N 567583.83 E 2.451 4196.20 7987.89 86.790 26.210 4187.13 4259.73 3881.95 N 1722.37 E 6003899.26 N 567605.37 E 1.768 4245.29 8034.07 86.970 25.820 4189.64 4262.24 3923.39 N 1742.60 E 6003940.87 N 567625.22 E 0.929 4291.40 8083.85 86.970 25.890 4192.27 4264.87 3968.12 N 1764.28 E 6003985.80 N 567646.51 E 0.140 4341.11 8132.19 87.220 25.250 4194.72 4267.32 4011.67 N 1785.11 E 6004029.53 N 567666.96 E 1 .420 4389.39 8177.98 86.230 25.150 4197.34 4269.94 4053.03 N 1804.58 E 6004071.06 N 567686.06 E 2.173 4435.10 8227.37 90.800 26.550 4198.62 4271.22 4097.45 N 1826.10 E 6004115.67 N 567707.19 E 9.677 4484.46 8274.54 95.250 28.280 4196.13 4268.73 4139.26 N 1847.78 E 6004157.66 N 567728.50 E 10.120 4531.52 8324.28 94.820 28.370 4191.76 4264.36 4182.87 N 1871.29 E 6004201.48 N 567751.62 E 0.883 4581.01 15 April, 2003 - 11:10 Page 4 of6 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 Your Ref: AP/500292313970 Job No. AKZZ2309935, Surveyed: 5 March, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft) 8370.20 96.680 29.820 4187.16 4259.76 4222.79 N 1893.51 E 6004241.60 N 567773.48 E 5.126 4626.61 8419.14 97.000 29.410 4181.33 4253.93 4265.04 N 1917.52 E 6004284.05 N 567797.12 E 1.058 4675.07 8467.62 96.180 28.590 4175.77 4248.37 4307.16 N 1940.87 E 6004326.38 N 567820.10 E 2.384 4723.14 8518.29 95.680 28.220 4170.53 4243.13 4351.49 N 1964.84 E 6004370.92 N 567843.68 E 1.225 4773.48 8563.31 95.190 29.050 4166.27 4238.87 4390.82 N 1986.32 E 6004410.44 N 567864.81 E 2.134 4818.23 8613.60 94.510 28.070 4162.02 4234.62 4434.84 N 2010.27 E 6004454.67 N 567888.37 E 2.366 4868.26 ----" 8657.97 94.450 28.720 4158.55 4231 .15 4473.75 N 2031.31 E 6004493.76 N 567909.07 E 1 .467 4912.44 8727.00 94.450 28.720 4153.20 4225.80 4534.10 N 2064.38 E 6004554.41 N 567941.60 E 0.000 4981.15 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 25.500° (True). Magnetic Declination at Surface is 25.582°(26-Feb-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 8727.00ft., The Bottom Hole Displacement is 4981.94ft., in the Direction of 24.480° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) ~ Comment 8727.00 4225.80 4534.10 N 2064.38 E Projected Survey 15 April, 2003 - 11:10 Page 5 of 6 DrillQuest 3.03.02.005 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 Your Ref: API 500292313970 Job No. AKZZ2309935, Surveyed: 5 March, 2003 BPXA Survey tool program for MPS-12PB1 From Measured Vertical Depth Depth (ft) (ft) 0.00 882.00 0.00 881.94 15 April, 2003 - 11:10 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 882.00 8727.00 881.94 Tolerable Gyro (MPS-12PB 1 Gyro) 4225.80 AK-6 BP _IFR-AK (MPS-12PB1) ~ -- ..---- Page 60f6 DrillQuest 3.03.02.005 ') "] a08-LBS 16-Apr-03 AOGCC Lisa Weepie 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-12 PB1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,727.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RàEC~E,\'Jl=() APR 2 Z 2.003 PJa5Ka Œi eJ. Gas Cons. Commìss1on ,Anchorage Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-12PB1 MWD ~/ Job No. AKMW2309935, Surveyed: 5 February, 2003 Survey Report 15 April, 2003 Your Ref: API 500292313970 Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 ~ Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid) Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True) Kelly Bushing: 72. 60ft above Mean Sea Level Elevation relative to Project V Reference: 72.60ft Elevation relative to Structure: 72.60ft 5~ ''''''Y-SUl! I:JRJL..-L.:l"'~ "s¡. t:;'i=tyit;'í:!:s A Halliburton Company Survey Ref: svy1150 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 MWD Your Ref: API 500292313970 Job No. AKMW2309935, Surveyed: 5 February, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 882.00 1.250 47.000 809.34 881 .94 5.838 2.15 E 5999996.45 N 565919.52 E -4.33 MWD Magnetic 1009.08 0.440 43.110 936.41 1009.01 4.53 8 3.50 E 5999997.77 N 565920.86 E 0.639 -2.58 1105.25 0.570 63.720 1032.57 1105.17 4.048 4.18 E 5999998.25 N 565921.54 E 0.230 -1.85 1202.63 0.460 49.520 1129.95 1202.55 3.588 4.91 E 5999998.73 N 565922.26 E 0.172 -1.11 1298.35 0.250 40.460 1225.67 1298.27 3.178 5.34 E 5999999.14 N 565922.69 E 0.226 -0.56 1394.23 0.140 354.050 1321.55 1394.15 2.898 5.46 E 5999999.42 N 565922.81 E 0.192 -0.26 .--- 1490.54 0.300 47.060 1417.86 1490.46 2.608 5.64 E 5999999.71 N 565922.98 E 0.252 0.08 1585.71 0.220 110.370 1513.02 1585.62 2.508 5.99 E 5999999.82 N 565923.33 E 0.296 0.33 1681.19 0.180 41 .370 1608.50 1681.10 2.45 8 6.26 E 5999999.87 N 565923.60 E 0.240 0.49 1776.70 0.220 332.830 1704.01 1776.61 2.178 6.28 E 6000000.14 N 565923.62 E 0.238 0.74 1872.22 0.270 245.340 1799.53 1872.13 2.108 5.99 E 6000000.21 N 565923.33 E 0.357 0.68 1968.42 0.520 241.040 1895.73 1968.33 2.418 5.40 E 5999999.90 N 565922.74 E 0.262 0.15 2062.53 0.440 260.850 1989.84 2062.44 2.678 4.67 E 5999999.63 N 565922.01 E 0.194 -0.40 2159.10 0.590 254.270 2086.40 2159.00 2.878 3.83 E 5999999.43 N 565921.17 E 0.167 -0.94 2183.42 0.670 248.360 2110.72 2183.32 2.958 3.57 E 5999999.34 N 565920.92 E 0.423 -1.13 2284.93 0.670 222.800 2212.23 2284.83 3.61 8 2.62 E 5999998.68 N 565919.97 E 0.292 -2.13 2380.59 0.140 147.200 2307.88 2380.48 4.128 2.30 E 5999998.16 N 565919.66 E 0.679 -2.72 2476.17 3.240 58.670 2403.41 2476.01 2.81 8 4.67 E 5999999.49 N 565922.02 E 3.389 -0.52 2572.63 6.750 57.210 2499.49 2572.09 1.68 N 11 .77 E 6000004.04 N 565929.07 E 3.641 6.58 2668.57 13.230 60.530 2593.93 2666.53 10.14 N 26.08 E 6000012.63 N 565943.31 E 6.778 20.38 2765.21 21.020 62.140 2686.21 2758.81 23.70 N 51.07 E 6000026.41 N 565968.18 E 8.075 43.38 2859.48 23.800 62.520 2773.35 2845.95 40.38 N 82.90 E 6000043.37 N 565999.86 E 2.953 72.14 2954.96 27.390 62.200 2859.45 2932.05 59.52 N 119.43 E 6000062.84 N 566036.22 E 3.763 105.14 3050.70 33.450 59.71 0 2941.98 3014.58 83.13 N 161.74E 6000086.81 N 566078.32 E 6.464 144.66 .~ 3146.18 39.030 56.230 3018.96 3091.56 113.14N 209.49 E 6000117.24 N 566125.81 E 6.227 192.30 3242.69 44.030 55.020 3091.19 3163.79 149.28 N 262.27 E 6000153.85 N 566178.26 E 5.247 247.65 3335.85 50.010 51.030 3154.68 3227.28 190.33 N 316.60 E 6000195.38 N 566232.23 E 7.141 308.09 3431.74 51. 000 51.250 3215.67 3288.27 236.76 N 374.22 E 6000242.31 N 566289.44 E 1.048 374.80 3529.51 51.750 51.890 3276.70 3349.30 284.23 N 434.06 E 6000290.31 N 566348.85 E 0.922 443.41 3625.06 54.210 51.500 3334.23 3406.83 331.52 N 493.92 E 6000338.12 N 566408.29 E 2.595 511.86 3721.45 58.400 50.290 3387.69 3460.29 382.10 N 556.12 E 6000389.26 N 566470.04 E 4.471 584.30 3817.73 60.960 50.980 3436.29 3508.89 434.81 N 620.37 E 6000442.53 N 566533.83 E 2.730 659.53 3913.52 61.170 50.550 3482.64 3555.24 487.83 N 685.30 E 6000496.12 N 566598.29 E 0.450 735.34 4009.51 61.410 49.840 3528.75 3601.35 541.73 N 749.98 E 6000550.58 N 566662.49 E 0.695 811.83 4105.18 63.650 48.900 3572.88 3645.48 597.00 N 814.39 E 6000606.43 N 566726.41 E 2.498 889.45 15 April, 2003 - 11 :11 Page2of6 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 MWD Your Ref: API 500292313970 Job No. AKMW2309935, Surveyed: 5 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) e/100ft) 4201.63 63.860 49.230 3615.53 3688.13 653.68 N 879.74 E 6000663.68 N 566791.26 E 0.376 968.74 4298.98 63.250 51.110 3658.89 3731 .49 709.51 N 946.67 E 6000720.10 N 566857.69 E 1.839 1047.95 4394.17 62.110 53.110 3702.58 3775.18 761.45 N 1013.41 E 6000772.62 N 566923.97 E 2.218 1123.56 4490.28 62.370 52.790 3747.34 3819.94 812.69 N 1081.28 E 6000824.46 N 566991.39 E 0.400 1199.03 4585.60 63.300 53.360 3790.86 3863.46 863.64 N 1149.08 E 6000876.01 N 567058.73 E 1.111 1274.20 4682.82 62.470 53.090 3835.17 3907.77 915.44 N 1218.39 E 6000928.42 N 567127.59 E 0.889 1350.80 - / 4778.64 64.750 50.290 3877.76 3950.36 968.66 N 1285.72 E 6000982.23 N 567194.44 E 3.537 1427.81 4874.35 64.810 49.950 3918.55 3991.15 1024.18 N 1352.16 E 6001038.33 N 567260.39 E 0.327 1506.53 4970.28 67.180 48.940 3957.57 4030.17 1081.16 N 1418.73 E 6001095.89 N 567326.46 E 2.651 1586.62 5067.28 71.010 45.790 3992.18 4064.78 1142.53 N 1485.35 E 6001157.86 N 567392.53 E 4.979 1670.70 5161.36 77.810 42.880 4017.46 4090.06 1207.33 N 1548.61 E 6001223.21 N 567455.21 E 7.817 1756.41 5257.98 77.810 38.210 4037.87 4110.47 1279.07 N 1609.98 E 6001295.49 N 567515.95 E 4.724 1847.59 5354.57 78.820 31.730 4057.45 4130.05 1356.55 N 1664.16 E 6001373.44 N 567569.44 E 6.652 1940.84 5450.76 80.010 26.690 4075.13 4147.73 1439.05 N 1710.28 E 6001456.35 N 567614.83 E 5.297 2035.16 5546.34 80.890 21.590 4091.00 4163.60 1525.03 N 1748.80 E 6001542.67 N 567652.60 E 5.342 2129.35 5643.38 79.330 16.130 4107.68 4180.28 1615.46 N 1779.70 E 6001633.36 N 567682.70 E 5.771 2224.27 5725.09 79.260 10.840 4122.87 4195.47 1693.50 N 1798.42 E 6001711.57 N 567700.72 E 6.362 2302.77 5825.61 82.570 10.050 4138.74 4211.34 1791.10 N 1816.41 E 6001809.32 N 567717.85 E 3.383 2398.61 5875.34 91.230 5.320 4141 .43 4214.03 1840.25 N 1823.03 E 6001858.53 N 567724.04 E 19.831 2445.82 5926.87 90.680 358.030 4140.57 4213.17 1891.72 N 1824.54 E 6001910.01 N 567725.09 E 14.185 2492.92 5970.87 90.430 353.090 4140.14 4212.74 1935.57 N 1821.13 E 6001953.83 N 567721.30 E 11.241 2531.04 6019.31 89.320 349.560 4140.25 4212.85 1983.45 N 1813.83 E 6002001.64 N 567713.57 E 7.639 2571.10 6068.58 89.320 349.710 4140.83 4213.43 2031.91 N 1804.96 E 6002050.02 N 567704.28 E 0.304 2611.03 6117.86 89.010 350.200 4141.55 4214.15 2080.43 N 1796.37 E 6002098.46 N 567695.26 E 1.177 2651.12 ~ 6164.08 89.630 345.910 4142.10 4214.70 2125.63 N 1786.81 E 6002143.58 N 567685.30 E 9.377 2687.81 6218.56 89.690 346.110 4142.42 4215.02 2178.50 N 1773.64 E 6002196.33 N 567671.66 E 0.383 2729.85 6261.19 89.750 345.720 4142.63 4215.23 2219.85 N 1763.26 E 6002237.58 N 567660.92 E 0.926 2762.70 6310.64 89.440 345.520 4142.98 4215.58 2267.75 N 1750.98 E 6002285.37 N 567648.22 E 0.746 2800.65 6355.16 89.320 344.720 4143.46 4216.06 2310.77 N 1739.55 E 6002328.29 N 567636.41 E 1.817 2834.56 6404.44 89.380 343.850 4144.02 4216.62 2358.20 N 1726.20 E 6002375.61 N 567622.64 E 1.770 2871.63 6449.01 90.620 343.940 4144.02 4216.62 2401.02 N 1713.84 E 6002418.32 N 567609.90 E 2.789 2904.96 6500.75 90.860 344.250 4143.35 4215.95 2450.78 N 1699.66 E 6002467.94 N 567595.28 E 0.758 2943.76 6545.95 91.850 344.700 4142.28 4214.88 2494.32 N 1687.57 E 6002511 .37 N 567582.81 E 2.406 2977.85 6598.80 89.510 343.990 4141 .65 4214.25 2545.20 N 1673.31 E 6002562.13 N 567568.10 E 4.627 3017.64 6642.48 89.630 345.110 4141.98 4214.58 2587.30 N 1661.67 E 6002604.12 N 567556.09 E 2.579 3050.63 15 April, 2003 - 11: 11 Page 30f6 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 MWD Your Ref: API 500292313970 Job No. AKMW2309935, Surveyed: 5 February, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/1 OOft) 6690.52 89.510 343.720 4142.34 4214.94 2633.57 N 1648.77 E 6002650.28 N 567542.78 E 2.904 3086.83 6739.01 89.070 343.660 4142.94 4215.54 2680.10 N 1635.15 E 6002696.69 N 567528.75 E 0.916 3122.97 6787.71 89.320 344.820 4143.63 4216.23 2726.97 N 1621.92 E 6002743.44 N 567515.11 E 2.436 3159.58 6835.24 87.280 345.240 4145.04 4217.64 2772.86 N 1609.65 E 6002789.22 N 567502.44 E 4.382 3195.72 6886.21 85.990 344.880 4148.03 4220.63 2822.02 N 1596.53 E 6002838.26 N 567488.89 E 2.627 3234.44 6931.04 84.930 347.470 4151.58 4224.18 2865.41 N 1585.86 E 6002881.56 N 567477.82 E 6.226 3269.01 ~ 6979.66 85.050 350.040 4155.83 4228.43 2912.91 N 1576.41 E 6002928.97 N 567467.96 E 5.271 3307.82 7026.42 85.310 349.920 4159.75 4232.35 2958.80 N 1568.30 E 6002974.78 N 567459.45 E 0.612 3345.74 7079.00 84.930 350.420 4164.23 4236.83 3010.42 N 1559.36 E 6003026.32 N 567450.05 E 1.192 3388.48 7122.48 89.510 352.970 4166.34 4238.94 3053.38 N 1553.09 E 6003069.22 N 567443.40 E 12.052 3424.56 7170.96 89.140 351 .170 4166.91 4239.51 3101.39 N 1546.40 E 6003117.17 N 567436.29 E 3.790 3465.01 7218.60 91.670 354.330 4166.57 4239.17 3148.64 N 1540.39 E 6003164.37 N 567429.86 E 8.497 3505.07 7269.39 91.300 355.130 4165.25 4237.85 3199.19 N 1535.73 E 6003214.88 N 567424.75 E 1.735 3548.69 7313.37 91.540 1.380 4164.16 4236.76 3243.12 N 1534.39 E 6003258.79 N 567423.03 E 14.217 3587.76 7366.11 89.570 2.700 4163.65 4236.25 3295.82 N 1536.27 E 6003311.51 N 567424.44 E 4.496 3636.14 7411 .48 88.460 4.110 4164.43 4237.03 3341 .1 0 N 1538.96 E 6003356.81 N 567426.73 E 3.955 3678.17 7462.06 87.220 6.430 4166.34 4238.94 3391.43 N 1543.60 E 6003407.18 N 567430.93 E 5.198 3725.59 7508.52 88.520 10.480 4168.07 4240.67 3437.34 N 1550.43 E 6003453.15 N 567437.35 E 9.149 3769.97 7557.08 87.340 12.780 4169.82 4242.42 3484.87 N 1560.21 E 6003500.76 N 567446.71 E 5.321 3817.08 7604.40 86.290 19.170 4172.45 4245.05 3530.26 N 1573.21 E 6003546.27 N 567459.31 E 13.664 3863.65 7651.38 88.830 24.500 4174.45 4247.05 3573.81 N 1590.66 E 6003589.97 N 567476.37 E 12.558 3910.47 7698.40 88.770 28. 680 4175.44 4248.04 3615.84 N 1611.69 E 6003632.19 N 567497.04 E 8.889 3957.46 7747.58 88.700 28.570 4176.52 4249.12 3659.00 N 1635.25 E 6003675.55 N 567520.21 E 0.265 4006.55 7795.90 87.41 0 28.450 4178.16 4250.76 3701 .44 N 1658.30 E 6003718.19 N 567542.89 E 2.681 4054.78 .--- 7844.90 87.280 28.230 4180.43 4253.03 3744.52 N 1681.54 E 6003761.47 N 567565.74 E 0.521 4103.67 7891.97 87.530 27.900 4182.57 4255.17 3786.01 N 1703.66 E 6003803.16 N 567587.50 E 0.879 4150.64 7938.73 87.400 26.480 4184.63 4257.23 3827.56 N 1725.00 E 6003844.90 N 567608.47 E 3.047 4197.33 7987.89 86.790 26.390 4187.13 4259.73 3871.52 N 1746.86 E 6003889.05 N 567629.94 E 1.254 4246.42 8034.07 86.970 25.600 4189.64 4262.24 3912.97 N 1767.07 E 6003930.67 N 567649.79 E 1.752 4292.53 8083.85 86.970 26.080 4192.27 4264.87 3957.71 N 1788.74 E 6003975.60 N 567671.06 E 0.963 4342.24 8132.19 87.220 25.050 4194.72 4267.32 4001.26 N 1809.57 E 6004019.34 N 567691.51 E 2.190 4390.52 8177.98 86.230 25.480 4197.34 4269.94 4042.60 N 1829.08 E 6004060.85 N 567710.65 E 2.357 4436.23 8227.37 90.800 26.640 4198.62 4271.22 4086.94 N 1850.77 E 6004105.38 N 567731.94 E 9.546 4485.59 8274.54 95.250 28.870 4196.13 4268.73 4128.62 N 1872.69 E 6004147.24 N 567753.50 E 10.549 4532.64 8324.28 94.820 29.140 4191.76 4264.36 4171.95 N 1896.72 E 6004190.79 N 567777.14 E 1.020 4582.10 15 April, 2003 - 11:11 Page 4 of 6 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 MWD Your Ref: API 500292313970 Job No. AKMW2309935, Surveyed: 5 February, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) C/100ft) 8370.20 96.680 29.920 4187.16 4259.76 4211.70 N 1919.24 E 6004230.74 N 567799.31 E 4.389 4627.67 8419.14 97.000 29.700 4181.33 4253.93 4253.86 N 1943.39 E 6004273.11 N 567823.09 E 0.792 4676.13 8467.62 96.180 29.220 4175.77 4248.37 4295.80 N 1967.08 E 6004315.25 N 567846.41 E 1.957 4724.17 8518.29 95.680 28.930 4170.53 4243.13 4339.84 N 1991.57 E 6004359.51 N 567870.51 E 1.139 4774.47 8563.31 95.190 29.830 4166.27 4238.87 4378.90 N 2013.56 E 6004398.76 N 567892.15 E 2.268 4819.19 8613.60 94.510 28.300 4162.02 4234.62 4422.69 N 2037.90 E 6004442.77 N 567916.11 E 3.319 4869.20 --" 8657.97 94.450 28.990 4158.55 4231 .15 4461.51 N 2059.10 E 6004481 .77 N 567936.97 E 1.556 4913.36 8727.00 94.450 28.990 4153.20 4225.80 4521.71 N 2092.46 E 6004542.26 N 567969.79 E 0.000 4982.06 Projected Suvey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 25.500° (True). Magnetic Declination at Surface is 25.582°(26-Feb-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 8727.00ft., The Bottom Hole Displacement is 4982.40ft., in the Direction of 24.833° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) -' Comment 8727.00 4225.80 4521.71 N 2092.46 E Projected Suvey 15 April, 2003 - 11:11 Page 5 of 6 DrillQuest 3.03.02.005 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-12PB1 MWD Your Ref: API 500292313970 Job No. AKMW2309935, Surveyed: 5 February, 2003 BPXA Survey tool program for MPS-12PB1 MWD Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 882.00 0.00 881.94 15 April, 2003 - 11:11 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 882.00 8727.00 881.94 Tolerable Gyro (MPS-12PB1 Gyro) 422~.80 MWD Magnetic (MPS-12PB1 MWD) .---- .~ Page 6 of 6 DrillQuest 3.03.02.005 ') ~:!Æ1æ :} !Æ~!Æ~~~!Æ ) AIfJl~1iA. OIL AND GAS CONSERVATION COMMISSION Pat Archey Senior Drilling Engineer BP Exploration (Alaska) Inc. P. O. Box 196612 Anchorage, Alaska 99519-6612 FRANK H. MURKOWSKI, GOVERNOR 333 W. -pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Milne Point Unit S-12 BP Exploration (Alaska) Inc. Pennit No: 203-023 Surface Location: 3334' NSL, 93' WEL, SEC. 12, TI2N, RI0E, UM Bottomhole Location: 2528' NSL, 2041' EWL, SEC. 06, TI2N, RIlE, UM Dear Mr. Archey: Enclosed is the approved application for pennit to drill the above referenced development well. This pennit to drill does not exempt you from obtaining additional pennits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required pennits and approvals have been issued. In addition, the Commission reserves the right to withdraw the pennit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative· Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the tenns and conditions of this pennit may result in the revocation or suspension of the pennit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~~ Michael L. Bill Commissioner BY ORDER OF THE COMMISSION DATED this ¿~day of February" 2003 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~JCí It 2-/4/ () 5 12. Distance to nearest property line 13. Distance to nearest well ADL 380109, 20411 MD No Close Approach 16. To be completed for deviat~d wells Kick Off Depth 2250' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Casina Weight Grade CouDling 20" 92# H-40 Weld 13-1/2" 10-3/4" 45.5# L-80 BTC 9-7/8" 7-5/8" 29.7# L-80 BTC 6-1/8" 4-1/211 12.7# L-80 BTC Hole 42" -) STATE OF ALASKA ') ALASKh ùlL AND GAS CONSERVATION COMIVIISSION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil o Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Plan KBE = 62.1' Milne Point Unit I Schrader 6. Property Designation Bluff /' ADL 380110 7. Unit or Property Name Milne Point Unit 8. Well Number MPS·12 /' 9. Approximate spud date 03/04/03 Amount $200,000.00 / 14. Number of acres in property 15. Pro~sed depth (MD and TVD) 2560 8600' MD / 4226' TVD 17. Anticipated press4re {see 20 AAC 25.035 (e) (2)} 96 0 Maximum surface'/'¡ 403 psig, At total depth (TVD) 4204' 11824 psig Setting Depth TOD Bottom MD TVD MD TVD Surface Surface 112' 112' Surface Surface 2250' 22501 Surface Surface 55361 42021 53861 41201 86001 4226' Multilateral 1 a. Type of work II Drill 0 Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface x = 565917, Y = 6000002 3334' NSL, 93' WEL, SEC. 12, T12N, R10E, UM At top of productive interval x = 567541, Y = 6001376 4692' NSL, 1542' EWL, SEC. 07, T12N, R11E, UM At total depth x = 568012, Y = 6004495 2528' NSL, 2041' EWL, SEC. 06, T12N, R11E,UM 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 Lenath 1121 22501 55361 32141 Quantitv of Cement (include stage data) 260 sx Arctic Set (Approx.) 536 sx Class IL', 220 sx Class 'G' .", 60 sx Class IL', 308 sx Class 'G' ,.,.. Uncemented Slotted Liner ". 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Structural Conductor Su rface Intermediate Production Liner Length Size Cemented MD TVD ~~ i'"^' r~ ~.. ¡; ~".(I' ,tu:1 11""" ',:1, ,~j '~\" t. I~,,"j ~. ~ Perforation depth: measured true vertical C' ¡......1 " {y, ;,~ y:.,ç¡O;1 \d \.1.1..[ 20. Attachments II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report II 20 AAC 25.050 Requirements Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By Name/Number: Terrie Hubble, 564-4628 21. Is~:~::Y ~a~::::ttr~(!;h1COITectt~:::::::=~Engineer Date //30/03 Permit Number API Number A,~rov~IÆate See cover letter 203 - 02-3 50- C5 z- 9 - 2- 3 / .J 9' ~ U ~ f) for other requirements Conditions of Approval: Samples Required 0 Yes J8I No Mud Log equired 0 Yes .Œ1 No Hydrogen Sulfide Measures 0 Yes E1 No Directional Survey Required BI Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: T.(-õt,~kLS,cMEdBf!C-~ ¡:JÇ.;. M L. Bill Approved By Form 1 0-40 1 Rev. 12-01-85 Commissioner by order of the commission , f Date I~ & ~) '3 SLbm In Triplicate )ne Point MPS-12 Well Permit ) IWell Name: IMPS-12 Drill and Complete Plan Summary I Type of Well (service I producer I injector): 1 Multi Lateral Producer "OA" & "OB" Surface Location: Target Location: TOP "OA" Target Location: BHL "OA" Well TD Target Location: TOP "08" Target Location: BHL "08" Well TD 19451 FNL, (33341 FSL), 931 FEL, (5181' FWL), SEC. 12, T12N,R10E E=565917.32 N=6000002.26' 586' FNL, (46921 FSL), 3232' FEL, (1542~ FWL), SEC. 7, T12N, R11 E E=567540.69 N=6001376.04 Z=4151 TVD/RKB 27511 FNL, (25281 FSL), 2721' FEL, (204,11 FWL), SEC. 6, T12N, R11 E E=568.012.0 N=6004495.0 Z=4171' TVD 400' FNL, (48781 FSL), 3150' FEL, (16241 FWL), SEC. 7, T12N,R11 E E=567621.0 N=6001563.0 Z=4202' TVD 27511 FNL, (25281 FSL), 2721' FEL, (20411 FWL), SEC. 6, T12N,R11 E E=568012.00 N=6004495.0 Z=4226' TVD ~'2.~2- I ç; '-I z.. .--- '-f11~1 - / I AFE Number: 1 I Estimated Start Date: 13/4/03 1 MD: 18600 I 1 / I Ri~: 1 Doyon 14 I Operatin~ days to complete: 120.4 1 Max Inc: 196 1 I KOP: 122501 1 KBE: 162.1 I TVD: 14226 1 I Well Desi~n (conventional, slim hole, etc.): I Conventional Grass Roots ML Producer I Objective: 1 Schrader OA & OB Sand Mud Program: 12.25-in Surface Hole Mud Properties: Density (ppg) Funnel visc YP HTHP 8.6 - 9.0 75 - 150 25 - 60 N/A Spud - LSND Freshwater Mud pH API Filtrate LG Solids 8.5 - 9.5 < 8 < 6.5 9.875-in Intermediate Hole Mud Properties: Density (ppg). Funnel visc YP HTHP 9.0-9.3775-150 25-60 N/A LSND Freshwater Mud pH API Filtrate LG Solids 9.0 - 9.5 < 8 < 6.5 6.125-in Production Hole Mud Properties: KCL-CaC03 Flo-Pro Density (ppg) Funnel visc VP HTHP pH API Filtrate LG Solids 8.6 - 9.3 40 - 55 22 - 27 <10 8.0 - 8.5 4 - 6 < 12 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. ) ,. )e Point MPS-12 Well Permit Cement Program: Casin~ Size 110-3/4" 45.5-lb/ft L-80 BTC Surface Casing Basis 250% excess over gauge hole in permafrost interval 40°fc¡ excess over gauge hole below permafrost Total Cement Volume: 453-bbl Wash 50-bbl water Spacer ~bl Viscosified Spacer (Alpha) weighted to 10.5-lb/gal Lead ~-sx 10.7 Iblgal Class L - 4.15 cuft/sx (cement to Tail ~~:~5.8Ib/gal Prem G -1.15 cufVsx (top of tail at -. ...,-~-~,. . --- ,,- -_. -,,- - BHST ~ 80°F from SOR, BHCT 85°F estimated by Halliburton Temp Casin~ Size 17-5/8 29.7-lb/ft L-80 BTC Intermediate Casing Basis 400/0 excess over gauge hole. Tai1500-ft MD above top of N-sand. Total Cement Wash 50-bbl water Volume: 35-bbl Spacer Lead tbbl Viscosified Spacer (Alpha) weighted to 10.50 ppg 6 -sx 10.7Ib/gal Class L-4.15 cuft/sx (cmt top at 3536')'" , 90~ above the top of Ugnu " " ." """"""~"""""""""*"""."""""",.".",.,.,.","'",."".,.""".....".,.,.""""","".,..."."".,.""",."""",.""",.""..,..,''''''''''''''''''''''''''''''''''''''''''''''''''''''''''"","""''"'"'''''',''1,''""""",''''''''''''''''''"""'"''''''''''''''''''''''''''''''''''''''''''''''""'"''''''''''''''''''''''''''''''''''''''''''''''''''""""""""""""..""""""""""",."","""""""""''''''''''''''''''''''''''''''''''''''."¡""""""""""",, """"',"'"¡""¡,,,,, "'","""'" I~O -sx 1.5.8 Ib/gal Prem G - 1.15 cuft/sx (top of tail at I -53' MD) 500' above the top of the N-sand BHST =:: 80°F from SOR, BHCT 85°F estimated by Halliburton Tail Temp Evaluation Program: 13-1/2" Section Open Hole: MWD/GRI IFRlCASANDRA Cased Hole: N/A 9-7/8" Section Open Hole: MWD/GRlRES IFRlCASANDRA Cased Hole: N/A 6-1/8"Section Open Hole: MWD/GRlRES ABIIIFRlCASANDRA 2 ) Formation Markers: Formation Tops Base Permafrost Top UÇlnu NA NB NC NE NF Top OA Top OB TO MOrkb (ft) 1822 4036 4853 4928 5020 5062 5227 5326 5536 8600 TVDrkb (ft) 1822 3622 3987 4017 4052 4067 4122 4151 4202 4226 CasingITubing Program: Pore Pressure (psi) 791 1572 1731 1744 1759 1765 1789 1802 1824 r )e Point MPS-12 Well Permit Estimated EMW (Ib/gal)* 8.35 8.35 8.35 8.35 8.35 8.35 8.35 8.35 8.35 q.-S Hole Csg/ WtlFt GraÇ.le co~ Length Top Bottom Size Tbg O.D. ./ MD / TVDrkb MD / TVDrkb 42-in 20-in* 92# H-40 Weld 112' 0 112-ft / 112-ft 13-1/2" 1 0-3/4" 45.5# L-80 BTC 2250' 0 2250' / 2250' 9-7/8" 7-5/8" 29.7# L-80 BTC 5536' 0 5536' / 4202' 6-1 /8" 4-1/2" 12.7# L-80 BTC 3214' 5386'/4120' 8600' / 4226' OB 6-1/8" 4-1 /2" 12.7# L-80 BTC 3257' 5327'/4151 8584'/4171 ' OA *The 20" casing is insulated Recommended Bit Program: BHA Hole Size Depth (MD) Bit Type Nozzle/Flow rate 1 13-1/2" o - 2250 M ill tooth 3-15 & 1-1 0 2 9-7/8" 2250 - 5536' M ill tooth 3-15 & 1-1 0 3 6-1/8" 5536' - TO Security 3-12 FM2643 3 ) ,. )e Point MPS-12 Well Permit Well Control: Surface Interval · The surface hole will be drilled with a diverter. · Integrity test: · Kick tolerance: I ntermediate and Production Intervals · Maximum anticipated BHP: 1 ,824-psi !f4,204-ft TVDss - Top of OB-sand · Maximum surface pressure: 1,403-psi @ surface (Based on BHP and a full column of gas from TD @ 0.1-psi/ft) · Planned BOP test pressure: Diverter will be function tested. BOPs: Test annular 250-psi low and 2,500-psi high, and rams to 250-psi low and 4,000-psi high."'- An FIT to 11.5-lb/gal will be made on the 7-5/8" casing shoe. 25.5-bbl with 10.0-lb/gal mud and FIT of 11.4-lb/gal @ 10-3/4" ,,/ casing shoe. 9.2-lb/gal NaCI I 6.8-lb/gal Diesel · Planned completion fluid: Drilling Hazards & Contingencies: Hydrates /' · Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+1- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. · Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation · We do not expect losses while drilling this well. · Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. 4 ) )e Point MPS-12 Well Permit Pad Data Sheet · Please Read the S-Pad Data Sheet thoroughly. Breathing · N/A Hydrocarbons · Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults · NA Hydrogen Sulfide · MPS Pad is not designated as an H2S Pad. Anti-collision Issues · MPS-12 has no anti-collision issues. 5 ) r )e Point MPS-12 Well Permit DRILL & COMPLETION PROCEDURE Pre-Rig Operations 1. Install 20-in insulated conductor. Procedure 1. MIRU. NU diverter on 20-in conductor and function test. /' 2. Dril/13-1/2" surface hole as per directional ~n. 3. Case and cement 10-3/4" surface casing. 4. NO diverter, NU BOPE and test. 5. Perform FIT. 6. Drill 9-7/8" hole to top OB-sand as per directional plan. 7. Case and cement 7-5/8" intermediate casing. Freeze protect 7-5/8" x 10-3/4" annulus 8. Perform FIT. ,/' 9. Drill 6-1/8" OB-sand lateral as per directional plan. /' 10. Run 4-1/2" uncemented slotted liner and hang off 150-ft inside 7-5/8" casing. 11. Set whipstock and mill window at top of OA-sand. /" 12. Drill 6-1/8" OA-sand lateral as per directional plan. 13. Pull whipstock. 14. ~un 4~ 1 /2"uncemented slotted liner with Baker Hookwall Hanger and hang off in 7.(þ- In casing. 15. Displace drilling mud to brine. 16. Run 4-1/2" jet pump completion as per schematic. 17. Land tubing hanger and test. 18. Set BPV. 19. NO BOP. 20. Install and test tree. 21. Pull BPV. 22. Test 7-5/8" x 4-1/2" annulus. 23. Freeze protect thru GLM. 24. Install BPV and secure well. 25. RD/MO. //. 6 TREE: Cameron 4-1/16" 5M WELLHEAD: FMC Gen 6 11 ", 5M Tubing Head: 11" x 4-1/2", , FMC Tubing Hanger PHUPUSI::LJ COMt-'Li:: liON --,p . P~-12 -)1 KB. ELEV =66.5' Cellar Box ELEV = 38.0' 1121 1f~ 20" 92 I bitt , H-40 Welded / Insulated Diesel Freeze protect to 750' MD 10-3/4" 45.5#, L-80, BTC-M Casing Drift: 9.875 Casing 10: 9.794 Coupling 00: 11.75" Burst: 5,210 psi Collapse: 2,480 psi ..411 9.2 KCI with corrosion inhibitor as packer fluid / Jet Pump Installed in - Sliding Sleeve Post rig! ~ III .. '3, ." 7-5/8" 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing 10: 6.875 Coupling 00: 11.75" Burst: 6,890 psi Collapse: 4,790 psi Window in 7-5/811 casing @ 5,327' MD Well Inclination @ Window = 74 Degrees 4-1/2" liner top @ 5,386' MD (150' lap) ~ 7.62511 Casing Shoe @ 5,536' MD,4202' TVD Well Inclination @ Shoe = 78 Degrees PBTD TO DATE 130 Sep 02 COMMENTS Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion REV. BY SKC ... 42" Hole 4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD , 2000' TVD, RP shear valve open position, "X" Nipple (2.813" ID) 70' below GLM 4-1/2", 12.6Iblfl, L-80, IBT-M Coupling OD: 5.2" Drift/ID: 3.833" Burst: 8,430, 80% 6,744 psi Collapse: 7.500. 80%=6.000 psi .... 10-3/4"@ 2,250' MD, 2250' TVD/RKB 'SIW 1- Wire Phoenix Pressure Gauge (3.850" ID, W/BIW I· wire down to lower sensor) Phoenix Pressure Gauge (2.840" ID) 7-5/8" x 4-1/2" Premier Packer ISet @ 5,300' MD, 4143' TVD I 3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod Wireline Entry Guide \~ 6-1/8" OA Lateral TD 18,584' MD 1 /' --... ---- - - -- - - OA Horizontal 6-1/8" hole r...... ...... - - - - - - - 4-1/211 Slotted Liner W/Hookwall hanger .~ " 9-7/8" Hole 6-1/8" OB Lateral TD /' 18,600' MD I , - - -- 08 Horizontal 6-1/8" hole ------ 4-1/2" Slotted Liner & Hanger Milne Point Unit WFI I : MPS-1? API NO: BP Expioratíon (A!8.sk~)) Dale: 121]612002 Dale: Date: Plan: MPS- 12 wp05 (plan MPS- ]2IPlan MPS-12 Created By: Ken Allen Checked: Reviewed: SURVEY PROGRAM Depth Fm Depth To S",veyiPIan Tool 33.00 1300.00 Planned: MPS-]2 "POS VB CB-GYRO-SS 1300.00 8600.95 Planned: MPS-12 "POS VB MWIHFR+MS REFERENCE INFORMATION Co-<>rdinate (NÆ) Refereoce: Wen Ceooe: Plan MPS-I2, True North Vetûcal (IVD) Refen:nce: S-Pad Dev 72.00 Section (VS) Reference: SIoI - (O.ooN,O.ooE) Measured Depth Reference: S-Pad Dev 72.00 CakuJatioo MelOOd: Minimum ÛJIwI1lre COMPANY DETAILS BP Amoco Minimum CUIV3ll1'C ISCWSA T ray CyliOOcf North Ellipücal + Casing Rules Based ò WELL DETAll.S Name #II-S +FJ-W NŒtbing Eastiog Latitl>Je Longitude SloI Plan MPS-I 28.05 42739 6000002.25 5659\1.42 70"24'37.604N ]49"27'47.698W WA TARGETDETAll.S Name 1VD #II-S +FJ-W Northing Eastiog Shape MPS.12(OB) TI 4202.00 1545.80 1117.45 6001563.00 567621.00 Point MPS 12 Hardline 4202.00 4644.01 1967.83 6004663.00 567844.00 Polygon MPS-]2 poly 4216.00 ]479.79 1943.90 600]499.00 567848.00 Polygoo MPS-12(OB) T4 42\1.00 405459 1892.6] 6004073.00 567774.00 Point MPS-12(OB)T5 4226.00 44745] 2]3435 6004495.00 568012.00 Point MPS-I2(OB) T2 4232.00 3018.87 1618.44 6003035.00 567509.00 Point MPS- ]2(OB) 1'3 4252.00 37~.IO 111650 6003721.00 567601.00 Point SECTION DETAILS Sec MD Inc Azi TVD +N/-S +FJ-W DLeg TFace VSec Target 1 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 2 2250.00 0.00 0.00 2250.00 0.00 0.00 0.00 0.00 0.00 3 3827.80 63.11 54.27 3527.54 458.19 636.92 4.00 0.00 687.76 4 4651.56 63.11 54.27 3900.09 887.24 1233.33 0.00 0.00 1331. 78 5 5536.93 78.00 20.00 4202.00 1545.80 1717.45 ~oo -71.89 2134.62 MPS-12(OB)T1 ._ 6 5773.31 89.79 354.01 4227.52 1776.71 1745.22 2.00 -67.30 2354.99 7 6938.80 89.79 354.01 4231.70 2935.82 1623.51 0.00 0.00 3348.77 8 7022.03 89.79 359.00 4232.00 3018.87 1618.44 6.00 90.06 3421.55 MPS-12(OB) T2 9 7072.03 86.93 359.90 4233.43 3068.85 1617.96 6.00 162.56 3466.45 10 7260.04 86.93 359.90 4243.51 3256.59 1617.63 0.00 0.00 3635.76 11 7722.21 91.00 25.00 4252.00 3704.10 1716.50 5.50 81.16 4082.24 MPS-12(OB) T3 12 7832.98 96.39 26.28 4244.87 3803.72 1764.31 5.00 13.34 4192.73 13 7992.08 96.39 26.28 4227.16 3945.49 1834.33 0.00 0.00 4350.84 14 8116.24 93.00 29.93 4217.00 4054.59 1892.61 4.00 132.86 4474.41 MPS-12(OB) T4 15 8231.55 88.39 29.93 4215.60 4154.50 1950.13 4.00 180.00 4589.34 16 8600.95 88.39 29.93 4226.00 4474.51 2134.35 0.00 0.00 4957.49 MPS-12(OB) T5 FORMATION TOP DETAILS No. TVDPath MDPath Fonnation 1 1822.00 1822.00 BPRF 2 3622.00 4036.67 TUZC 3 3987.00 4853.09 SBF2-NA 4 4017.00 4928.11 SBFI-NB 5 4052.00 5020.51 SBE4-NC 6 4067.00 5062.05 SBE2-NE 7 4122.00 5227.77 SBEI-NF 8 4151.00 5326.95 TSBD-OA 9 4174.00 5414.40 TSBC 10 4202.00 5536.93 TSBB-OB CASING DETAILS No. TVD MD Name Size 1 2250.00 2250.00 103/4' 1O.750·-----~ 2 4202.00 5536.93 75/8" 7.625 3 4226.00 8600.94 41/2' 4.500 Cakulalion ~kthod: ~": ~k=~ Error Surface: Wamjn~ Mcrhod: All TVD depths are ssTVD plus 72'for RKBE. 800 , ]~ 03/4" "80 Start Dir 4/100' .~ c::. # ## ... ., "" ~ , BPRF :/ 2000 - 600 :§' ~ ~ .c p. Ö ] '2 > 2400 2 E- 2250'TVD 2250' MD, - MD, 4227.52' TVD ~StartE~:~ S 3.51'TVD 1/100' : 7992.08' MD. 4227.16'TVD End Dir : 8231.55' MD, 4215.6' TVD o 4112" m;u.;' , . : : . . - ~~u"c1f- ! Plan MPS-12 (plan MPS-12Ll ¡#Ffflj;~~1t¡;:~Z¡Efr MP'·l2_ . . . - . - -. .. . - -.. - .' - ~__ _~u u .n___'____.;,,__ :. ....'.mn_!_ ,'mon '..n_'~_"u:'u,,__; u ; .;........ ; .. .. - I I I I I I I 3200 4800 [800ft/in] 5600 I 4000 ~~. 5773.31' 2400 Vertical Section at 25.50 End Dir TSBD-OA 3827.8' MD, 3527.54' TVD EndDi 800 o 3200 4000 Plan: MPS-12 wp05 (plan MPS-I2IPlan MPS-12 Created By: Ken Allen Date: Checked: Date: Reviewed: Date: Tool CB-GYRO-SS MWD+IFR+MS SURVEY PROGRAM S""'-eyIPIan Depth Fm Depth To 3.00 1300.00 300.00 8600.95 REFERENCE INFORMA nON Co-ordinal< (NiE) Refereo<e: Well Centœ: Plan MPS-I2. True Non\¡ Verûc31 (IVD) Refeœuœ: s-I'ad Dev 72.00 Se<tion (VS) Reference: Slot - (O.OON,O.OOE) Measured Depth Rel'ermce: s-I'ad Dev 72.00 Caku1aûon Method: Minin:nm Coo.>ature COMPANY DETAILS I' Amoco Mininun Curvattn ISCWSA Tray C)1indcr North Ðliplical t Casing Rul'S 0....'<1 ò MPS 12 Hardline L_ 41/2" MPS 12((JBln /~Im MPS-12wp05 /~~J _ / Total Depth: 8600.95' MD, 4226' TVD / / MPS-1LIOBI 4 I ____ f ¡---"'i! End Dir : 8231.55' MD, 4215.6' TVD - . /) ----.;' " I / " Slart Dir 4/100': 7992.08' MD, 4227.l6'TVD .12(OBI T.'! ,---/ -r" /--......:~' End Dif~: 7832.98' MD, 4244.87' TVD , ¡ I, / / SI:Lrt Dir§/IOO': 7722.21' MD, 4252TVD · / ' U¡ ,'! .. .... it r--¡ 5,.1/' Ð" :3.5/100': 7260.04' MD, 4243.51'TVD · I I' \ . ).6) T2 \n·~ E lid Dir : 7072.03' MD, 4233.43' TVD · \ n, Sr:JIT Dir:6/100': 6938.8' MD, 4231.7'TVD \ \ . \ l \ . I i ~ \ !, ~\ '. \ I \ \ \ I \ \ I i \ \ '< \ ~ \ ~ 'L I \ \LJ , I \ End Pit,: 5773.31' MD, 4227.52' TVD 7 5/~" '. .J \ . MPS-12(PB1 T --r:=tt=-~i1l1þ01Y 5536.93' MD, 4202TVD j .. J' i WELL DETAll.S N:uœ +w-s +FJ·W Nodhing Easting Latinxle Loog;tude Slot Plan MPS·12 28.05 42739 600000225 565917.42 70'24·37.604N 14!n7'47.698W NlA TARGETDETAH.S Næœ TVD +W-S +FJ-W Northing Easting Shape MPS-12(OB) T1 4202.00 1545.80 J7l7.45 6001563.00 567621.00 Point MPS 12 H_ 4202.00 4614.01 1%7.83 6004663.00 567844.00 1'01),800 MPS-12 pol}' 4216.00 1479.79 1943.90 6001499.00 567848.00 1'01)'800 MPS-12(OB)T4 4217.00 405459 1892.61 6004073.00 56m4.00 Point MPS-I2(OB) T5 4226.00 447451 213435 6004495.00 568012.00 Point MPS-I2(OB) T2 4232.00 3018.87 1618.44 6003035.00 567509.00 Point MPS-I2(OB) T3 4252.00 3704.10 171650 6003721.00 567601.00 Point PJanoed; MPS-12 wp05 V8 PJanoed; MPS-12 wp05 V8 C.kuJalioo M.'Ihod: ~;~=~ Error SurfKe: W.mil1 ! McthaI: 4800- Target MPS-12(OB,,-,,, MPS-12(OB) T2 MPS-12(OB) T3 VSec 0.00 0.00 687.76 1331.78 2134.62 2354.99 3348.77 3421.55 3466.45 3635.76 4082.24 4192.73 4350.84 4474.41 4589.34 4957.49 SECTION DErAILS Azi TVD +N/-S +EI- W DLeg TFace 0.00 33.00 0.00 0.00 0.00 0.00 0.00 2250.00 0.00 0.00 0.00 0.00 54.27 3527.54 458.19 636.92 4.00 0.00 54.27 3900.09 887.24 1233.33 0.00 0.00 20.00 4202.00 1545.80 1717.45 4.00 -71.89 354.01 4227.52 1776.71 1745.22 12.00 -67.30 354.01 4231.70 2935.82 1623.51 0.00 0.00 359.00 4232.00 3018.87 1618.44 6.00 90.06 359.90 4233.43 3068.85 1617.96 6.00 162.56 359.90 4243.51 3256.59 1617.63 0.00 0.00 25.00 4252.00 3704.10 1716.50 5.50 81.16 26.28 4244.87 3803.72 1764.31 5.00 13.34 26.28 4227.16 3945.49 1834.33 0.00 0.00 29.93 4217.00 4054.59 1892.61 4.00 132.86 29.93 4215.60 4154.50 1950.13 4.00 180.00 29.93 4226.00 4474.51 2134.35 0.00 0.00 Inc 0.00 0.00 63.11 63.11 78.00 89.79 89.79 89.79 86.93 86.93 91.00 96.39 96.39 93.00 88.39 88.39 MD 33.00 2250.00 3827.80 4651.56 5536.93 5773.31 6938.80 7022.03 7072.03 7260.04 7722.21 7832.98 7992.08 8116.24 8231.55 8600.95 ec l I 5 ¡ 7 ¡ ) o .1 2 3 4 5 6 4000 3200 MPS-12(OB) T4 MPS-12(OB) T5 FORMA nON TOP DErAILS No. TVDPath MDPath Formation 1 1822.00 1822.00 BPRF 2 3622.00 4036.67 TUZC 3 3987.00 4853.09 SBF2-NA 4 4017.00 4928.11 SBFI-NB 5 4052.00 5020.51 SBE4-NC 6 4067.00 5062.05 SBE2-NE 7 4122.00 5227.77 SBEl-NF 8 4151.00 5326.95 TSBD-OA 9 4174.00 5414.40 TSBC 10 4202.00 5536.93 TSBB-OB .~ Size 10.750 7.625 4.500 CASING DErAILS Name 103/4' 75/8" 4 1/2" MD 2250.00 5536.93 8600.94 TVD 2250.00 4202.00 4226.00 No. 1 2 3 E 2 o ~ ~ 2400 :;: t:: ~ :;: '5 o VJ All TVD depths are ssTVD plus 72'for RKBE. ~/i ~ - 600 I 3200 3900.09TVD I 2400 MD, 'i/Í' 4h'i TVD I I 600 W est( - )/East( + ) [800ft/in] I on pi'' I 't'" '\1 3827,;8' M [ , .. 800 800 ) BP ) KW A Planning Report MAP :Oåt~; <~211.~/?qQ~: .:TiïJJe: 11':0: T> . .. ... ... :p~ge:l ( Ç9~O..~iµ..~~~~)~~f~re..s.,: VYEJH::PJ ·P~T1~.TrUeNbrtlJ · .... .··y~~~~ê~'.cJ:YP)~efereø.ç.,:·· ..:...§t~~...~...".....·... .... ,.. {... 2..-9..:'..... ..:.. .:... .......:. .:.:......... .... ..,. ·S~f~~~JY~)·.·~~· çe;i. ·\IV~IfW;P9N¡º~9QF,?5;50Aii)·. . ... ···~ury~ÿÇålc~låti .. ~tMd: ··Mlnimû,yrCuNatüt'e· . Db: EOräcle< ····çom:panhB.8Amoco . !:Ji'i~hfi: ..·I\i1Utle.'P9int :~~){.::r .... .P~~1¡2 :.. ..·'W~~,,~~~h: ·Mp$~t~ Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Site: M pt S Pad Alaska, Zone 4 Well Centre BGGM2002 Site Position: Northing: 5999978.00 ft Latitude: 70 24 37.329 N From: Map Easting: 566345.00 ft Longitude: 149 27 35.171 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.51 deg Well: Plan MPS-12 Slot Name: Well Position: +N/-S 28.05 ft Northing: 6000002.25 ft Latitude: 70 24 37.604 N +E/-W -427.39 ft Easting : 565917.42 ft Longitude: 149 27 47.698 W Position Uncertainty: 0.00 ft Wellpath: Plan MPS-12 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 6/29/2001 57460 nT Depth From (TVD) ft 0.00 +N/-S ft 0.00 Height 72.00 ft Plan: MPS-12 wp05 Date Composed: Version: Tied-to: Principal: Yes Casing Points Well Ref. Point 0.00 ft Mean Sea Level 26.28 deg 80.78 deg Direction deg 25.50 12/12/2002 8 From Well Ref. Point 1\10 TVD · Dillmeter · ····ft ft in 2250.00 2250.00 10.750 13.500 10 3/4" 5536.93 4202.00 7.625 9.875 75/8" 8600.94 4226.00 4.500 6.125 4 1/2" Formations MD TVD·· Formations Lithology J)iliAng1e Dip J)irection ft ft deg: deg 1822.00 1822.00 BPRF 0.00 0.00 4036.67 3622.00 TUZC 0.00 0.00 4853.09 3987.00 SBF2-NA 0.00 0.00 4928.11 4017.00 SBF1-NB 0.00 0.00 5020.51 4052.00 SBE4-NC 0.00 0.00 5062.05 4067.00 SBE2-NE 0.00 0.00 5227.77 4122.00 SBE1-NF 0.00 0.00 5326.95 4151.00 TSBD-OA 0.00 0.00 5414.40 4174.00 TSBC 0.00 0.00 5536.93 4202.00 TSBB-OB 0.00 0.00 0.00 OWC 0.00 0.00 Targets Map Map <- Latitude --> <- Longitude -> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft MPS-12(OB) T1 4202.00 1545.80 1717.45 6001563.00 567621.00 70 24 52.805 N 149 26 57.348 W MPS-12 poly 4216.00 1479.79 1943.90 6001499.00 567848.00 70 24 52.155 N 149 26 50.709 W -Polygon 1 4216.00 1479.79 1943.90 6001499.00 567848.00 70 24 52.155 N 149 26 50.709 W ') BP) KW A Planning Report MAP ..ç~JÎtij~ný: BP ArMco·. . .··Fiëld~' .. . MilriePoirit .. ". .Sf~e:.. ..... 'M~t.i$:'~å( .. ...... .... . ·WeU:..·· 'RI~I'iMP~,,~~·· ~ellpa~~: '...pl$n MP$A12 Targets . .. .. . ... .... . . .... ... ..... ....... .... ::[)~te: 12/16/4Ö02Time:' 11:02:.05 . .... .. Page: .." 2· ., ,···q?b9r:~i~å~e~tJ.~~ë~re~,4;e:·)W~JI;~lliIri;,MP9-1.2 IrÜeNþr1n. . . . .Y~~~~~~I('l'~P).Ji~'~~~øç¢: '···,~Ÿ7g;º·< . ...... ..... .... . '~~~~?,~.(y. ·t~r~nc~: ... ........ X·,,· ,. . .. " .... qqN,P,QOç: ·~5.;50~n $uryeyC~ ti~oMetbQd:.·· iriirnuniquryatürø . Db: Oråêlê .. ··+N/-:S ···tE:/2W ··.·.····."M~p,··.·· . ·NJ:~Þ·· ; .. .,.<H--.þ~~¡þ1(1~L.;,.~ ., . <ë~L~~gi~l1~e* '.·NqrtÞ~t!g . .. .~;isti~g p¢~M}n. Hß,~C .',' i)egl\iJ.iÎl· ....~~~,. ft ..'.. ff . .ft ;.. , )ft ... -Polygon 2 4216.00 1459.68 1616.68 6001476.01 567521.00 70 24 51.958 N 149 27 0.303 W -Polygon 3 4216.00 3152.98 1381.59 6003167.00 567271.00 70 25 8.612 N 149 27 7.185 W -Polygon 4 4216.00 3683.71 1533.29 6003699.00 567417.99 70 25 13.831 N 149 27 2.734 W -Polygon 5 4216.00 4620.50 1910.61 6004639.00 567787.00 70 25 23.044 N 149 26 51.662 W -Polygon 6 4216.00 4450.81 2327.17 6004473.00 568205.00 70 25 21.374 N 149 26 39.446 W -Polygon 7 4216.00 3604.32 1802.63 6003622.00 567688.00 70 25 13.050 N 149 26 54.836 W -Polygon 8 4216.00 3136.97 1721.49 6003154.00 567610.99 70 25 8.454 N 149 26 57.219 W MPS-12(OB) T4 4217.00 4054.59 1892.61 6004073.00 567774.00 70 25 17.478 N 149 26 52.194 W MPS-12(OB) T5 4226.00 4474.51 2134.35 6004495.00 568012.00 70 25 21.607 N 149 2645.101 W MPS 12 Hardline 4226.00 4644.01 1967.83 6004663.00 567844.00 70 25 23.275 N 149 26 49.984 W -Polygon 1 4226.00 4644.01 1967.83 6004663.00 567844.00 70 25 23.275 N 149 26 49.984 W -Polygon 2 4226.00 4607.71 2681.61 6004633.00 568558.00 70 25 22.916 N 149 26 29.050 W MPS-12(OB) T2 4232.00 3018.87 1618.44 6003035.00 567509.00 70 25 7.293 N 149 27 0.241 W MPS-12(OB) T3 4252.00 3704.10 1716.50 6003721.00 567601.00 70 25 14.032 N 149 26 57.361 W Plan Section Information ,. MD IöCl Adm·. ..TvD +N/-S· +E/~W . DLS ,·.·BUíld. . Turn .., 1'1"0.. At deg qøg· it ft ft qèg/1P9ftdeg/1QOftdeg/10.0ft .. ..'p~~L . 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 2250.00 0.00 0.00 2250.00 0.00 0.00 0.00 0.00 0.00 0.00 3827.80 63.11 54.27 3527.54 458.19 636.92 4.00 4.00 0.00 0.00 4651.56 63.11 54.27 3900.09 887.24 1233.33 0.00 0.00 0.00 0.00 5536.93 78.00 20.00 4202.00 1545.80 1717.45 4.00 1.68 -3.87 -71.89 MPS-12(OB) T1 5773.31 89.79 354.01 4227.52 1776.71 1745.22 12.00 4.99 -11.00 -67.30 6938.80 89.79 354.01 4231.70 2935.82 1623.51 0.00 0.00 0.00 0.00 7022.03 89.79 359.00 4232.00 3018.87 1618.44 6.00 -0.01 6.00 90.06 MPS-12(OB) T2 7072.03 86.93 359.90 4233.43 3068.85 1617.96 6.00 -5.72 1.80 162.56 7260.04 86.93 359.90 4243.51 3256.59 1617.63 0.00 0.00 0.00 0.00 7722.21 91.00 25.00 4252.00 3704.10 1716.50 5.50 0.88 5.43 81.16 MPS-12(OB) T3 7832.98 96.39 26.28 4244.87 3803.72 1764.31 5.00 4.86 1.16 13.34 7992.08 96.39 26.28 4227.16 3945.49 1834.33 0.00 0.00 0.00 0.00 8116.24 93.00 29.93 4217.00 4054.59 1892.61 4.00 -2.73 2.93 132.86 MPS-12(OB) T4 8231.55 88.39 29.93 4215.60 4154.50 1950.13 4.00 -4.00 0.00 180.00 8600.95 88.39 29.93 4226.00 4474.51 2134.35 0.00 0.00 0.00 0.00 MPS-12(OB) T5 Survey loci Azim TVD Sys TVD MapN MapE VS DLS TFO ToollComniëöt deg deg ft ft ft ft ft deg/100ff deg 33.00 0.00 0.00 33.00 -39.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 100.00 0.00 0.00 100.00 28.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 200.00 0.00 0.00 200.00 128.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 300.00 0.00 0.00 300.00 228.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 400.00 0.00 0.00 400.00 328.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 500.00 0.00 0.00 500.00 428.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 600.00 0.00 0.00 600.00 528.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 700.00 0.00 0.00 700.00 628.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 800.00 0.00 0.00 800.00 728.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 900.00 0.00 0.00 900.00 828.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 1000.00 0.00 0.00 1000.00 928.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 1100.00 0.00 0.00 1100.00 1028.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 1200.00 0.00 0.00 1200.00 1128.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS 1300.00 0.00 0.00 1300.00 1228.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 1400.00 0.00 0.00 1400.00 1328.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS ) BP ) KW A Planning Report MAP Datê:.12/16/200Z,.···.,·..···.·;i.Tinte:11:Q2:Qp.. .... ... .... .·.·..·~~ge;. .. ..·.3. ·Ç97ºt4iº~t¢(NFJ) êfer¢ri¿~:·· . ···.VVøll:r?I.~pM~~~1.,~,or,.uØ \J~l1h .,... ..,;Vêt~i~~i.(T.v: . ... SJ~açipe\(~?~Q..,. .i/d ·~ect~()JÌð;r . .... .... WE3.II(P;qqN.,P;()O~¡?~~$Q~i). Suryeyt:â . ···MiniriïurrtCÜ¡;vature. . . Db: o raCiEr Survey 1500.00 0.00 0.00 1500.00 1428.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 1600.00 0.00 0.00 1600.00 1528.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 1700.00 0.00 0.00 1700.00 1628.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 1800.00 0.00 0.00 1800.00 1728.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 1822.00 0.00 0.00 1822.00 1750.00 6000002.25 565917.42 0.00 0.00 0.00 BPRF 1900.00 0.00 0.00 1900.00 1828.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 2000.00 0.00 0.00 2000.00 1928.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 2100.00 0.00 0.00 2100.00 2028.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 2200.00 0.00 0.00 2200.00 2128.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 2250.00 0.00 0.00 2250.00 2178.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS 2300.00 2.00 54.27 2299.99 2227.99 6000002.77 565918.12 0.76 4.00 0.00 MWD+IFR+MS 2400.00 6.00 54.27 2399.73 2327.73 6000006.89 565923.75 6.88 4.00 360.00 MWD+IFR+MS 2500.00 10.00 54.27 2498.73 2426.73 6000015.11 565934.97 19.08 4.00 0.00 MWD+IFR+MS 2600.00 14.00 54.27 2596.53 2524.53 6000027.40 565951.74 37.30 4.00 0.00 MWD+IFR+MS 2700.00 18.00 54.27 2692.63 2620.63 6000043.69 565973.96 61.45 4.00 360.00 MWD+IFR+MS 2800.00 22.00 54.27 2786.58 2714.58 6000063.90 566001.54 91.43 4.00 0.00 MWD+IFR+MS 2900.00 26.00 54.27 2877.92 2805.92 6000087.93 566034.34 127.07 4.00 0.00 MWD+IFR+MS 3000.00 30.00 54.27 2966.20 2894.20 6000115.68 566072.19 168.22 4.00 360.00 MWD+IFR+MS 3100.00 34.00 54.27 3050.98 2978.98 6000146.99 566114.92 214.66 4.00 0.00 MWD+IFR+MS 3200.00 38.00 54.27 3131.87 3059.87 6000181.73 566162.32 266.17 4.00 0.00 MWD+IFR+MS 3300.00 42.00 54.27 3208.46 3136.46 6000219.71 566214.15 322.51 4.00 0.00 MWD+IFR+MS 3400.00 46.00 54.27 3280.38 3208.38 6000260.76 566270.16 383.39 4.00 0.00 MWD+IFR+MS 3500.00 50.00 54.27 3347.28 3275.28 6000304.68 566330.09 448.52 4.00 0.00 MWD+IFR+MS 3600.00 54.00 54.27 3408.83 3336.83 6000351.24 566393.63 517.58 4.00 360.00 MWD+IFR+MS 3700.00 58.00 54.27 3464.74 3392.74 6000400.23 566460.48 590.23 4.00 0.00 MWD+IFR+MS 3800.00 62.00 54.27 3514.73 3442.73 6000451.41 566530.31 666.13 4.00 0.00 MWD+IFR+MS 3827.80 63.11 54.27 3527.54 3455.54 6000466.00 566550.21 687.76 4.00 0.00 MWD+IFR+MS 3900.00 63.11 54.27 3560.19 3488.19 6000504.05 566602.14 744.20 0.00 0.00 MWD+IFR+MS 4000.00 63.11 54.27 3605.42 3533.42 6000556.77 566674.07 822.38 0.00 0.00 MWD+IFR+MS 4036.67 63.11 54.27 3622.00 3550.00 6000576.10 566700.45 851.05 0.00 0.00 TUZC 4100.00 63.11 54.27 3650.64 3578.64 6000609.49 566746.00 900.57 0.00 0.00 MWD+IFR+MS 4200.00 63.11 54.27 3695.87 3623.87 6000662.20 566817.94 978.75 0.00 0.00 MWD+IFR+MS 4300.00 63.11 54.27 3741.09 3669.09 6000714.92 566889.87 1056.93 0.00 0.00 MWD+IFR+MS 4400.00 63.11 54.27 3786.32 3714.32 6000767.64 566961.80 1135.11 0.00 0.00 MWD+IFR+MS 4500.00 63.11 54.27 3831 .54 3759.54 6000820.35 567033.73 1213.29 0.00 0.00 MWD+IFR+MS 4600.00 63.11 54.27 3876.77 3804.77 6000873.07 567105.67 1291.47 0.00 0.00 MWD+IFR+MS 4651.56 63.11 54.27 3900.09 3828.09 6000900.25 567142.76 1331.78 0.00 0.00 MWD+IFR+MS 4700.00 63.73 52.22 3921.76 3849.76 6000926.47 567177.22 1370.12 4.00 288.11 MWD+IFR+MS 4800.00 65.09 48.05 3964.96 3892.96 6000984.89 567245.89 1452.09 4.00 289.03 MWD+IFR+MS 4853.09 65.86 45.87 3987.00 3915.00 6001018.16 567280.89 1497.04 4.00 290.83 SBF2-NA 4900.00 66.57 43.97 4005.92 3933.92 6001048.82 567310.93 1537.52 4.00 291.73 MWD+IFR+MS 4928.11 67.01 42.84 4017.00 3945.00 6001067.75 567328.52 1562.11 4.00 292.50 SBF1-NB 5000.00 68.15 39.99 4044.42 3972.42 6001117.96 567372.02 1626.00 4.00 292.94 MWD+IFR+MS 5020.51 68.49 39.18 4052.00 3980.00 6001132.75 567384.03 1644.49 4.00 294.03 SBE4-NC 5062.05 69.18 37.57 4067.00 3995.00 6001163.33 567407.81 1682.25 4.00 294.33 SBE2-NE 5100.00 69.83 36.10 4080.29 4008.29 6001191.96 567428.86 1717.10 4.00 294.92 MWD+IFR+MS 5200.00 71.58 32.29 4113.34 4041.34 6001270.47 567481.18 1810.38 4.00 295.43 MWD+IFR+MS 5227.77 72.09 31.25 4122.00 4050.00 6001293.02 567494.87 1836.61 4.00 296.69 SBE1-NF 5300.00 73.42 28.56 4143.42 4071.42 6001353.11 567528.73 1905.38 4.00 297.01 MWD+IFR+MS 5326.95 73.92 27.57 4151.00 4079.00 6001376.04 567540.69 1931.21 4.00 297.81 TSBD-OA 5400.00 75.31 24.91 4170.38 4098.38 6001439.47 567571.26 2001.63 4.00 298.09 MWD+IFR+MS 5414.40 75.59 24.38 4174.00 4102.00 6001452.20 567576.96 2015.57 4.00 298.80 TSBC ) BP ), KW A Planning Report MAP Survey 5500.00 5536.93 5550.00 5575.00 5600.00 5625.00 5650.00 5675.00 5700.00 5725.00 5750.00 5773.31 5800.00 5900.00 6000.00 6100.00 6200.00 6300.00 6400.00 6500.00 6600.00 6700.00 6800.00 6900.00 6938.80 6950.00 7000.00 7022.03 7050.00 7072.03 7100.00 7200.00 7260.04 7300.00 7400.00 7500.00 7600.00 7700.00 7722.21 7800.00 7832.98 7900.00 7992.08 8000.00 8100.00 8116.24 8200.00 8231.55 8300.00 8400.00 8500.00 8600.95 ·I)j:¢)... ·deg 77.27 78.00 78.61 79.79 81.00 82.23 83.48 84.74 Date:··· 12/~()t4PP~·.· ...··...·..··[I'i ... . :..11:()2:q5.' ............... ... ii ..Påg~: ..4 .. . Có2ó .~<NEJªe(t1reµce:. . . ~1I:171.~9·rvtF?$'i1g~T(lJeNqdn. . ···......·..·.··M~~~i"p~~~~~r~~.ê~: . .7f~dP~Y·'l'?;9>···......·. t.. ...... .. ....~e~.~i~... .. .....)~~f~ft1nc.~: ............ ... ··¡W~!1(9·0p~;9!09s;.?~~PO~1) :: $~..yeyCälculatio~M~tb~d~ .. MinimÜm çurvat\,lre. .. ··Db:. .OråCl.e·· .. . . TVD .. .s...·Y$. T. VD...·· ............ ,. ·ft ··ft 4194.09 4122.09 4202.00 4130.00 4204.65 4132.65 Áiiô{ .. døg·· 21.31 20.00 18.52 15.72 12.93 10.17 7.42 4.68 86.02 1.96 87.30 359.24 88.59 356.53 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.01 89.79 354.68 89.79 357.68 89.79 359.00 88.19 359.50 86.93 359.90 86.93 359.90 86.93 359.90 86.93 359.90 87.27 88.13 89.02 89.91 90.80 91.00 94.78 96.39 96.39 96.39 96.17 93.44 93.00 89.65 88.39 88.39 88.39 88.39 88.39 2.07 7.51 12.94 18.37 23.79 25.00 25.90 26.28 26.28 26.28 26.52 29.45 29.93 29.93 29.93 29.93 29.93 29.93 29.93 4209.33 4213.50 4217.15 4220.26 4222.82 4224.84 4226.29 4227.19 4227.52 4227.62 4227.97 4228.33 4228.69 4229.05 4229.41 4229.77 4230.12 4230.48 4230.84 4231.20 4231.56 4231.70 4231.74 4231.92 4232.00 4232.49 4233.43 4234.93 4240.29 4243.51 4245.53 4249.55 4252.03 4252.97 4252.35 4252.00 4248.08 4244.87 4237.41 4227.16 4226.30 4217.91 4217.00 4215.06 4215.60 4217.53 4220.34 4223.16 4226.00 4137.33 4141.50 4145.15 4148.26 4150.82 4152.84 4154.29 4155.19 4155.52 4155.62 4155.97 4156.33 4156.69 4157.05 4157.41 4157.77 4158.12 4158.48 4158.84 4159.20 4159.56 4159.70 4159.74 4159.92 4160.00 4160.49 4161.43 4162.93 4168.29 4171.51 4173.53 4177.55 4180.03 4180.97 4180.35 4180.00 4176.08 4172.87 4165.41 4155.16 4154.30 4145.91 4145.00 4143.06 4143.60 4145.53 4148.34 4151.16 4154.00 6001529.14 6001563.00 6001575.12 6001598.64 6001622.58 6001646.85 6001671.39 6001696.13 6001721.02 6001745.97 6001770.92 6001794.13 6001820.64 6001919.99 6002019.34 6002118.68 6002218.03 6002317.38 6002416.73 6002516.07 6002615.42 6002714.77 6002814.11 6002913.46 6002952.00 6002963.14 6003012.99 6003035.00 6003062.96 6003084.96 6003112.89 6003212.73 6003272.68 6003312.57 6003412.17 6003510.65 6003607.13 6003700.70 6003721.00 6003791.43 6003821.03 6003881.00 6003963.39 6003970.47 6004058.85 6004073.00 6004145.92 6004173.40 6004232.99 6004320.05 6004407.11 6004495.00 567608.57 567621.00 567625.11 567632.13 567638.02 567642.76 567646.33 567648.73 567649.95 567649.99 567648.85 567646.73 567643.70 567632.39 567621.07 567609.75 567598.43 567587.11 567575.79 567564.47 567553.15 567541.84 567530.52 567519.20 567514.81 567513.60 567509.83 567509.00 567508.39 567508.08 567507.78 567506.73 567506.09 567506.43 567513.89 567530.76 567556.88 567592.01 567601.00 567633.76 567647.93 567676.89 567716.69 567720.12 567766.10 567774.00 567815.13 567830.62 567864.23 567913.33 567962.43 568012.00 · ...'þE¡$.1"~(:) . . .. .d~g/19OftØeg 2098.67 4.00 298.93 2134.62 4.00 299.65 2147.34 12.00 292.70 2171.63 12.00 2195.81 12.00 2219.81 12.00 2243.57 12.00 2267.01 12.00 2290.08 12.00 2312.72 12.00 2334.85 12.00 2354.99 12.00 2377.75 0.00 2463.02 0.00 2548.28 0.00 2633.55 0.00 2718.82 0.00 2804.09 0.00 2889.35 0.00 2974.62 0.00 3059.89 0.00 3145.16 0.00 3230.42 0.00 3315.69 0.00 3348.77 0.00 3358.36 6.00 3401.95 6.00 3421.55 6.00 3446.63 6.00 3466.45 6.00 3491.63 0.00 3581.69 0.00 3635.76 0.00 3672.06 5.50 3765.49 5.50 3861.89 5.50 3960.37 5.50 4060.04 5.50 4082.24 5.50 4159.92 5.00 4192.73 5.00 4259.33 0.00 4350.84 0.00 4358.70 4.00 4458.24 4.00 4474.41 4.00 4557.89 4.00 4589.34 4.00 4657.55 0.00 4757.22 0.00 4856.88 0.00 4957.49 0.00 rrt>9.1/dómD1~lit . MWD+IFR+MS MPS-12(OB) T1 MWD+IFR+MS 293.00 MWD+IFR+MS 293.53 MWD+IFR+MS 293.99 MWD+IFR+MS 294.40 MWD+IFR+MS 294.74 MWD+IFR+MS 295.02 MWD+IFR+MS 295.24 MWD+IFR+MS 295.40 MWD+IFR+MS 295.49 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 90.06 MWD+IFR+MS 90.06 MWD+IFR+MS 90.05 MPS-12(OB) T2 162.56 MWD+IFR+MS 162.55 MWD+IFR+MS 180.00 MWD+IFR+MS 180.00 MWD+IFR+MS 180.00 MWD+IFR+MS 81.16 MWD+IFR+MS 81.05 MWD+IFR+MS 80.83 MWD+IFR+MS 80.70 MWD+IFR+MS 80.65 MWD+IFR+MS 80.68 MPS-12(OB) T3 13.34 MWD+IFR+MS 13.39 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 132.86 MWD+IFR+MS 132.88 MWD+IFR+MS 133.13 MPS-12(OB) T4 180.00 MWD+IFR+MS 180.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MPS-12(OB) T5 P054998 12/19/2002 INV# CK121702G DATE CHECK NO. DATE 12/19/2002 P054998 INVOICE I CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT NET PERMIT TO DRILL FEE (Y) PS -I Z I L... ( KECEIVED FEB 0 3 2003 AI ska '1i1 & Gas Cons. Commiss.on a Anchorage I THE ATTACHED CHECK IS IN PAVMENT FOR ITEMs DESCRIBEDABDVE. __ - - BP EXPLORATION, PRUDHOE BAY UNIT PO BOX 196612 ANCHORAGe, AK995Jß-6612 PAY: TO THE ORDER OF: . , . . .",. December 19,2002 **********""****$100.00 *** ". 0 5 t. q q a II' ': 0.. . 20 38 q 5 I: 0 ~ 2 ? a q b II' NÔ1~W·.I..'R~~~E.'}..~2QF~~~:·~· .; ~. .. _"__'" : . {.:~\:': }.~..":~\ ·::(~;~~;-::~~.~5.::;i.~:~:?~\:.;;::.~ . .\~~~ ,~.._-_. "'''' '.,~ ..... .. i~2:[:![r.{~~~ii:;;;is~;;~;¡~~;;.\:::::~ H '-" ·__..4 ) , ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME PTD# CHECK WHAT APPLIES ADD-ONS (OPTIONS) MUL TI LATERAL (If API number last two (2) digits are between 60-69) "CLUE" The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to be reported as· a function ·of the. original API number stated above. HOLE In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07110/02 Ojody\templates The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. /'1/0 WELL PERMIT CHECKLIST COMPANY (i/l X WELL NAME ~/.J - / ~ PROGRAM: Exp _ Dev.25 Redrll _ Re-Enter _ Serv _ Wellbore seg _ FIELD & POOL Ç2$/4 c:? INIT CLASS .IJ~/__ / -¿!7J 7 GEOl AREA 9¡0 UNIT# //.3 <- <2' ON/OFF SHOREQ¿) ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . ,({\ N 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N 3. Unique well name and number. . . . . . . . . . . . . . . . . Y\I 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y \I 5. Well located proper distance from drilling unit boundary. Y " 6. Well located proper distance from other wells.. . . . . . . . . Y" APPR D:?¡ 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y ~ ø/ /] 3 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y " ßL,L .Þ': 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N 12. Permit can be issued without administrative approval.. . . . . \ yJ N (Service Well Only) 13. Well located w/in area & strata authorized by injection order #_ xX ,If./. A (Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . .. ,¿ N ENGINEERING 15. Conductor string provided. . . . . . . . . .. ...... (þN 16. Surface casing protects all known USDWs. . . . . . . N 17. CMT vol adequate to circulate on conductor & surf csg. N 18. CMT vol adequate to tie-in long string to surf csg. . . . ff fL / 19. CMT will cover all known productive horizons. . . . . . .. N S/o #( (j 20. Casing designs adequate for C! T, B & permafrost. . . . . . . ..) N D ' I 21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 'N ØVlliv'-- / ~ . 22. If a re-drill, has a 10-403 for abandonment been approved. . . N/J\"¡ 23. Adequate wellbore separation proposed.. . . . . . . . . . . . N 24. If diverter required, does it meet regulations. " . . . . ... . N . 0 25, Drilling fluid program schematic & equip list adequate. . . . . N fJ1./i,-ý P'l/JJ -{, 3 P PC¡ . 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N 27. BOPE press rating appropriate; test to 4000 psig. N 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . . N 29. Work will occur without operation shutdown. . . . . . . . . . ./.N 30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y <hi) 31. Mechanical condition of wells within AOR verified. . . . . . . . --¥--N""At/A-- ~~ Y N Y N Y N APPR DATE \lJGA- 7-/~/O~ (Service Well Only) GEOLOGY APPR DATE R#:' ~(V " (É~ploratory Only) ( 32. Permit can be issued wlo hydrogen sulfide measures. . . . . 33. Data presented on potential overpressure zones. . . . . . . . 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . 35. Seabed condition survey (if off-shore). . . . . . ~ ...... 36. Contact namelphone for weekly progress reports. ...... { GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER COMMISSIONER: Commentsllnstructions: RP~ TEM JDH JBR COT DTS àe¡0i- DJ WGA / MJW MLB ð :2I/o.s-/Õ3 Rev: 10/15/02 SFD_ G:\geology\permits\checklist.doc ) ) Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to sim,plify finding information. information of this nature is accumulated at the end of the file under APPEN.DIX. No special effort has been made to chronologically organize this category of information. ,,( ') ) ~ ð3-0d3 I / (pt! g " Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Apr 11 16:08:24 2003 Reel Header Service name............ .LISTPE Date.. . .. . . . . . . '.' . . . . . . .03/04/11 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 03/04/11 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-12 PB1 500292313970 B.P. Exploration (Alaska) Inc. Sperry-Sun Drilling Services 11-APR-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW2309935000 J. STRAHAN D. FERGUSON MWD RUN 2 MW2309935000 J. STRAHAN D. FERGUSON MWD RUN 3 MW2309935000 J. STRAHAN D. FERGUSON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3334 93 .00 72.60 38.70 # WELL CASING RECORD 1ST STRING 2ND STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 13.500 20.000 112.0 9.875 10.750 2240.0 ) ') 3RD STRING PRODUCTION STRING 6.125 7.625 5779.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY (GM) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUNS 2 AND 3 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUN 3 ALSO INCLUDED AT-BIT-INCLINATION (ABI) . 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 4/10/03. MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS I, 2, AND 3 REPRESENT WELL MPS-12 PB1 WITH API#: 50-029- 23139-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8727IMD/4226'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE 1 and clipped curves; all bit runs merged. .5000 START DEPTH STOP DEPTH ) ") GR 39.0 8673.5 Rap 113.5 8727.0 FET 2230.5 8680.5 RPD 2230.5 8680.5 RPM 2230.5 8680.5 RPS 2230.5 8680.5 RPX 2230.5 8680.5 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 MERGED MAIN PASS. $ MERGE TOP 39.0 2250.5 5789.0 MERGE BASE 2250.5 5789.0 8727.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units......... ..Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . - 999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Service Unit FT FT/H API OHMM OHMM OHMM OHMM HOUR MWD MWD MWD MWD MWD MWD MWD Min 39 0.79 11.74 1.07 1.43 0.6 1.6 0.06 Max 8727 1775.17 145.47 2000 2000 2000 2000 45.26 Mean 4383 283.63 72.3011 21.2395 24.0248 35.4459 36.3786 0.86803 Nsam 17377 17228 17270 12901 12901 12901 12901 12901 First Reading For Entire File......... .39 Last Reading For Entire File.......... .8727 First Reading 39 113.5 39 2230.5 2230.5 2230.5 2230.5 2230.5 Last Reading 8727 8727 8673.5 8680.5 8680.5 8680.5 8680.5 8680.5 .' ) ") File Trailer Service name... ......... .STSLIB.OOl service Sub Level Name... Version Number.... ...... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type................ LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name........ .... .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type.............. . .LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 39.0 113.5 STOP DEPTH 2178.5 2250.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 27-FEB-03 Insite 4.3 Memory 2250.0 112.0 2250.0 .1 1.3 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GM Dual GR $ TOOL NUMBER 72829 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 13.500 112.0 # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): Spud Mud 9.30 143.0 8.5 600 ) ) 9.6 .000 .0 .000 77.0 .000 .0 .000 .0 FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value...................... -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 39 2250.5 1144.75 4424 39 2250.5 ROP MWD010 FT/H 25.9 1534.42 277.216 4275 113.5 2250.5 GR MWDOI0 API 16.85 145.47 71.0343 4280 39 2178.5 First Reading For Entire File......... .39 Last Reading For Entire File.......... .2250.5 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation... ....03/04/11 Maximum Physical Record. .65535 File Type.............. ..LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name........... ..STSLIB.003 Service Sub Level Name. . . Version Number.......... .1.0.0 ) Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR FET RPD RPM RPX RPS ROP $ 3 ) header data for each bit run in separate files. 2 .5000 START DEPTH 2179.0 2230.5 2230.5 2230.5 2230.5 2230.5 2251.0 STOP DEPTH 5751.0 5743.5 5743.5 5743.5 5743.5 5743.5 5789.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 02-MAR-03 Insite 66.37 Memory 5789.0 2250.0 5789.0 .1 80.9 TOOL NUMBER 124724 103792 9.875 2240.0 LSND 9.30 82.0 8.5 400 6.0 3.500 2.550 4.700 3.500 72.0 101.2 72.0 72.0 ) ) # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format specification Record Data Record Type................ ..0 Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service unit Min Max Mean Nsam Reading Reading DEPT FT 2179 5789 3984 7221 2179 5789 ROP MWD020 FT/H 8.28 1775.17 338.687 7077 2251 5789 GR MWD020 API 11.74 124.12 69.0974 7145 2179 5751 RPX MWD020 OHMM 1.64 1001.97 21.2601 7027 2230.5 5743.5 RPS MWD020 OHMM 1.43 2000 24.138 7027 2230.5 5743.5 RPM MWD020 OHMM 1.45 2000 28.7458 7027 2230.5 5743.5 RPD MWD020 OHMM 1.6 2000 29.6017 7027 2230.5 5743.5 FET MWD020 HOUR 0.06 39.87 0.644719 7027 2230.5 5743.5 First Reading For Entire File......... .2179 Last Reading For Entire File......... ..5789 File Trailer Service name... ......... .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type......... . . . . . . .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 ') Maximum Physical Record. .65535 File Type................ LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 4 ) header data for each bit run in separate files. 3 .5000 START DEPTH 5744.0 5744.0 5744.0 5744.0 5744.0 5751.5 5789.5 STOP DEPTH 8680.5 8680.5 8680.5 8680.5 8680.5 8673.5 8727.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB!G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # 05-MAR-03 Insite 66.37 Memory 8727.0 5789.0 8727.0 82.6 97.0 TOOL NUMBER 62456 73634 6.125 5779.0 FLO PRO 9.20 51.0 9.5 24000 4.2 .220 .160 .180 .260 68.0 93.0 71.0 73.0 ) ) TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5744 8727 7235.5 5967 5744 8727 ROP MWD030 FT/H 0.79 601.18 221.988 5876 5789.5 8727 GR MWD030 API 33.07 132.36 77.1449 5845 5751.5 8673.5 RPX MWD030 OHMM 1.07 2000 21.2148 5874 5744 8680.5 RPS MWD030 OHMM 3.01 2000 23.8893 5874 5744 8680.5 RPM MWD030 OHMM 0.6 2000 43.4612 5874 5744 8680.5 RPD MWD030 OHMM 2.76 2000 44.4858 5874 5744 8680.5 FET MWD030 HOUR 0.13 45.26 1.13518 5874 5744 8680.5 First Reading For Entire File......... .5744 Last Reading For Entire File.......... .8727 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number... ....... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF Tape Trailer Service name.......... . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/04/11 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... .UNKNOWN Continuation Number..... .01 ) ) Next Tape Name.......... . UNKNOWN Comments... ............ ..STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name........... ..LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/04/11 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name......... ..UNKNOWN Comments........ ....... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File ') ) a03-œ3 t l f.DtJ7 Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Fri Apr 11 14:08:31 2003 Reel Header Service name... . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 03/04/11 origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/04/11 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... .UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-12 500292313900 B.P. Exploration (Alaska) Inc. Sperry-Sun Drilling Services 11-APR-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW2309935000 J. STRAHAN D. FERGUSON MWD RUN 2 MW2309935000 J. STRAHAN D. FERGUSON MWD RUN 3 MW2309935000 J. STRAHAN D. FERGUSON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW2309935000 J. STRAHAN D. FERGUSON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 6 12N 10E 3334 93 72.60 38.70 ) ) # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 13.500 9.875 6.125 CASING SIZE (IN) 20.000 10.750 7.625 DRILLERS DEPTH (FT) 112.0 2240.0 5779.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL WAS EFFECTED BY MEANS OF AN OPEN-HOLE SIDETRACK IN THE MPS-12 PB1 WELLBORE, AT ABOUT 8066'MD/4264'TVD. THIS SIDETRACK WAS DRILLED DUE TO GEOLOGIC UNCERTAINTIES IN THE ORIGINAL WELL. 4. MWD RUN 1 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY (GM) , UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUNS 2 - 4 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). MWD RUNS 3 AND 4 ALSO INCLUDED AT-BIT- INCLINATION (ABI). 6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 4/10/03. MWD DATA ARE CONSIDERED PDC. 7. MWD RUNS 1 - 4 REPRESENT WELL MPS-12 WITH API#: 50-029-23139-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8460'MD/4298'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 ) ') Maximum Physical Record. .65535 File Type................ LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 39.0 113.5 2230.5 2230.5 2230.5 2230.5 2230.5 STOP DEPTH 8405.5 8460.0 8413.0 8413.0 8413.0 8413.0 8413.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 4 MERGED MAIN PASS. $ MERGE TOP 39.0 2250.5 5789.0 8066.5 MERGE BASE 2250.5 5789.0 8066.0 8460.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . - 999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name Service Unit Min Max First Reading Last Reading Mean Nsam ) ) DEPT FT 39 8460 4249.5 16843 39 8460 ROP MWD FT/H 8.28 1775.17 288.834 16694 113.5 8460 GR MWD API 11.74 145.47 70.3847 16734 39 8405.5 RPX MWD OHMM 1.07 2000 22.5939 12366 2230.5 8413 RPS MWD OHMM 1.43 2000 25.5799 12366 2230.5 8413 RPM MWD OHMM 0.6 2000 37.3595 12366 2230.5 8413 RPD MWD OHMM 1.6 2000 38.2661 12366 2230.5 8413 FET MWD HOUR 0.06 45.26 0.8755 12366 2230.5 8413 First Reading For Entire File......... .39 Last Reading For Entire File.......... .8460 File Trailer Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name........... ..STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type................ LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 39.0 113.5 STOP DEPTH 2178.5 2250.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 27-FEB-03 Insite 4.3 Memory 2250.0 112.0 2250.0 .1 1.3 # TOOL STRING (TOP TO BOTTOM) ') VENDOR TOOL CODE TOOL TYPE GM Dual GR $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type................ ..0 Data Specification Block Type... ..0 Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 TOOL NUMBER 72829 13.500 112.0 Spud Mud 9.30 143.0 8.5 600 9.6 .000 .000 .000 .000 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 ) .0 77.0 .0 .0 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 39 2250.5 1144.75 4424 39 2250.5 ROP MWD010 FT/H 25.9 1534.42 277.216 4275 113.5 2250.5 GR MWD010 API 16.85 145.47 71.0343 4280 39 2178.5 First Reading For Entire File......... .39 Last Reading For Entire File.......... .2250.5 File Trailer Service name............ .STSLIB.002 Service Sub Level Name.. . ) version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type................ LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPM RPD RPS RPX FET ROP $ 3 ) header data for each bit run in separate files. 2 .5000 START DEPTH 2179.0 2230.5 2230.5 2230.5 2230.5 2230.5 2251.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 5751.0 5743.5 5743.5 5743.5 5743.5 5743.5 5789.0 02-MAR-03 Insite 66.37 Memory 5789.0 2250.0 5789.0 .1 80.9 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 TOOL NUMBER 124724 103792 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): 9.875 2240.0 LSND 9.30 ) ') MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 82.0 8.5 400 6.0 3.500 2.550 4.700 3.500 72.0 101.2 72.0 72.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . .Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2179 5789 3984 7221 2179 5789 ROP MWD020 FT/H 8.28 1775.17 338.687 7077 2251 5789 GR MWD020 API 11.74 124.12 69.0974 7145 2179 5751 RPX MWD020 OHMM 1.64 1001.97 21.2601 7027 2230.5 5743.5 RPS MWD020 OHMM 1.43 2000 24.138 7027 2230.5 5743.5 RPM MWD020 OHMM 1.45 2000 28.7458 7027 2230.5 5743.5 RPD MWD020 OHMM 1.6 2000 29.6017 7027 2230.5 5743.5 FET MWD020 HOUR 0.06 39.87 0.644719 7027 2230.5 5743.5 First Reading For Entire File......... .2179 Last Reading For Entire File.......... .5789 File Trailer Service name............ .STSLIB.003 Service Sub Level Name. . . Version Number.......... .1.0.0 ') Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number... ....... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record..65535 File Type................ LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX GR ROP $ 4 ) header data for each bit run in separate files. 3 .5000 START DEPTH 5744.0 5744.0 5744.0 5744.0 5744.0 5751.5 5789.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 8066.0 8066.0 8066.0 8066.0 8066.0 8066.0 8066.0 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): 05-MAR-03 Insite 66.37 Memory 8066.0 5789.0 8066.0 82.6 97.0 TOOL NUMBER 62456 73634 6.125 5779.0 FLO PRO 9.20 51.0 ') ) MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 9.5 24000 4.2 .220 .160 .180 .260 68.0 93.0 71.0 73.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5744 8066 6905 4645 5744 8066 ROP MWD030 FT/H 16.01 601.18 233.359 4554 5789.5 8066 GR MWD030 API 33.07 101.76 71.0817 4630 5751.5 8066 RPX MWD030 OHMM 1.07 2000 24.3837 4645 5744 8066 RPS MWD030 OHMM 3.86 2000 27.4778 4645 5744 8066 RPM MWD030 OHMM 0.6 2000 51.8037 4645 5744 8066 RPD MWD030 OHMM 2.76 2000 52.4882 4645 5744 8066 FET MWD030 HOUR 0.13 45.26 1.28655 4645 5744 8066 First Reading For Entire File......... .5744 Last Reading For Entire File.......... .8066 File Trailer Service name............ .STSLIB.004 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .03/04/11 ) Maximum Physical Record. .65535 File Type.... . . . . . . . . . . . . LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name. .......... ..STSLIB.005 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 File Type.... . . . . . . . . . . . . LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR ROP FET $ 5 ) header data for each bit run in separate files. 4 .5000 START DEPTH 8066.5 8066.5 8066.5 8066.5 8066.5 8066.5 8066.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 8413.0 8413.0 8413.0 8413.0 8405.5 8460.0 8413.0 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: 05-MAR-03 Insite 66.37 Memory 8460.0 8066.0 8460.0 83.6 87.0 TOOL NUMBER 62456 73634 6.125 5779.0 FLO PRO 9.20 54.0 9.0 ') ) MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 22000 4.0 .220 .180 .170 .310 73.0 93.0 72.0 69.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.... ..............0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record........... ..Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8066.5 8460 8263.25 788 8066.5 8460 ROP MWD040 FT/H 17.77 483.44 224.748 788 8066.5 8460 GR MWD040 API 42.11 129.49 75.0827 679 8066.5 8405.5 RPX MWD040 OHMM 4.29 70.88 24.12 694 8066.5 8413 RPS MWD040 OHMM 4.56 62.02 27.4762 694 8066.5 8413 RPM MWD040 OHMM 4.68 69.47 27.9001 694 8066.5 8413 RPD MWD040 OHMM 5.08 80.54 30.8062 694 8066.5 8413 FET MWD040 HOUR 0.16 10.38 0.461037 694 8066.5 8413 First Reading For Entire File......... .8066.5 Last Reading For Entire File.......... .8460 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/11 Maximum Physical Record. .65535 I . ') ) File Type................LO Next File Name.......... .STSLIB.006 Physical EOF Tape Trailer Service name............ .LISTPE Date.................... .03/04/11 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number. .... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/04/11 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File