Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-023
) )
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~03 - O~?þ Well History File Identifier
Organizing (done)
o Two-sided 1111111111111111111
D Rescan Needed
[
~
RESCAN
DIGITAL DATA
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Color Items:
D Greyscale Items:
D Diskettes, No.
D Other, NolType:
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
Scanning Preparation
~.
x 30 =
&0
o Other:: ~
Date:4 ~~ ~ Isl Y11...')
I -
Date: tf (}.9 os- 151 V'1D
I
+ &0 = --OTA~ PAGES <60
(Count does not i clude cover sheet) V\ A_ Yì
Date: if ::uJ D"!::'- Isl , v£-,
,'"'7, I .
BY:
Helen ~aria J.
Project Proofing
BY:
Helen ~_
BY:
Helen ~ria ):
Production Scanning
Stage 1
Page Count from Scanned File: 15 I (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: 0f'.S r NO
Helen( Maria) Date:lf d-fI, DS Isf mP
If NO in stage 1 page(s) discrepancies were found: YES NO
BY:
Stage 1
BY:
Helen Maria
Date: 151
I II
IIII II I
Date: 151
Quality Checked 1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Helen Maria
Comments about this file:
•
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
` i;AN DFEB23 4 201
December 30, 2011
Mr. Tom Maunder c 1O3
Alaska Oil and Gas Conservation Commission S _ f D—
333 West 7 Avenue f ' ` P
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of MPS -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
. •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
MPS -Pad
10/11/2011
Corrosion
• Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPS -01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011
MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011
MPS-03 2021460 50029231050000 Open Flutes - Treated
MPS-04 2030520 , 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-05 2021370 50029231000000 Open Flutes - Treated
MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009
MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011
MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009
MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011
MPS -11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011
.- "'�j MPS -12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011
MPS-13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009
MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011
MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011
MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 7/29/2011
MPS-17 2021730 50029231150000 Open Flutes - Treated
MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011
MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009
MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011
MPS-23 2021320 50029230980000 Open Flutes - Treated
MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011
MPS -25 2021030 50029230890000 Open Flutes - Treated
MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011
MPS-27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011
MPS-28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011
MPS -29 2021950 50029231190000 Open Flutes - Treated
MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS -31 2020140 50029230660000 Open Flutes - Treated
MPS -32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011
MPS-33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011
MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011
MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS-37 2070520 50029233550000 13.9 Need top job NA
MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011
MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA
MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011
MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011
MPSB -04 _ 500299990799 0.6 NA 0.6 NA 3.4 _ 7/30/2011
i ~
--,--.~
~s
~..
~« --
~ i
o3io~ zoos
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\C~rPgs_Inserts\Microfilm Marker.doc
.
. ,,_.,
f~~,~_
-~~- ..y
WELL LOG TRANSlVlITT AL
To: State of Alaska
Alaska Oil and Gas Conservation Comrn.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 13, 2006
RE: MWD Formation Evaluation Logs: MPK-09, MPS-12 PB1 L1, MPI-13, MPS-18 PBl.
- - -
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
MPK-09: ÐO~- 01'-/ -tf: /439'Zr
Digital Log Images: 1 CD Rom
50-029-23247-00
MPS-12_PB1_L1: Q6"3 -og"3 ù 14401 ( 903 -Ode..¡ tJ /LI'ID'd.
Digital Log Images: 1 CD Rom
50-029-23133-00, 70, 60
MPI-13: U:t~ 8öl -ö-=t~ ':t 'IL{3D¡C)
Digital Log Images: 1 CD Rom
50-029-23012-00
MPS-18_PB1: UTC- dÖ'd -''è)<-tQ I:Ì )'-I'-/DO
Digital Log Images:
50-029-23133-00, 70
1 CD Rom
scANNED rEB 0 1 2007
to
e
e
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7'h Avenue, Suite 100
Anchorage, Alaska 99501
Febmary 20,2004
! 3Lp / 0
RE: MWD Formation Evaluation Logs: MPS-12 & MPS-12 PBl,
AK-MW-2309935
MPS-12:
Digital Log Images:
50-029-23139-00
cQ03-DÐ--3
1 CD Rom
MPS-12 PBl:
Digital Log Images:
50-029-23139-70
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
~ Date: r!) I;) ~ I Ole;
Signed!lQJ )-ttaa.âiLI~
C ð )
11~1~~{J(~
DATA SUBMITTAL COMPLIANCE REPORT
4/1/2005
Permit to Drill 2030230
Well Name/No. MILNE PT UNIT SB 5-12
Operator BP EXPLORATION (ALASKA) INC
Jì~ (.¡,,¿ À' r:;.h ~~. ~
API No. 50-029-23139-00-00
MD
4298 ~. Completion Date 3/13/2003 / Completion Status
8460 .../
1VD
-----~ ---
-----
REQUIRED INFORMATION
Mud Log No
Samples No
-------
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, ABI, IFRlCASANDRA
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number
~~pt~~
~ Rpt
¡
~
~RPt
¡ Rpt
ð-fD D
~D
C+-yr;t
'-it Rpt
I._~_~._----
Log Log
Scale Media
Run
No
1
Name
LIS Verification
Directional Survey
Directional Survey
LIS Verification
Directional Survey
LIS Verification
LIS Verification
Directional Survey
Directional Survey
Ó*648
41'647
Well Cores/Samples Information:
Name
Interval
Start Stop
Received
Sent
ADDITIONAL INFORMATION
Well Cored? Y G!)
Chips Received? ~
Daily History Received?
Formation Tops
Analysis
Received?
~.
-- -----------
- -----.--
Comments:
1-01L
Current Status 1-01L
UIC N
Directional Survey X' y"LA-
(data taken from Logs Portion of Master Well Data Maint)
Interval )
OH/ -
Start Stop CH Received Comments
39 8405 Open 4/29/2003
882 8727 Open 4/22/2003 PB1 MWD
882 8727 Open 4/22/2003 PB1GYRO
39 8673 Open 4/29/2003 PB1
882 8727 Open 4/22/2003 PB1
39 8673 Open 4/29/2003 PB1
39 8405 Open 4/29/2003
8034 8460 Open 4/22/2003 MWD
8034 8460 Open 4/22/2003
Sample
Set
Number Comments
--
Ô)N
,®N
DATA SUBMITTAL COMPLIANCE REPORT
4/1/2005
Permit to Drill 2030230
Well Name/No. MILNE PT UNIT SB S-12
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23139-00-00
MD 8460
TVD 4298
h=0n Date
3/13/2003
Completion Status . 1-01L
Current Status 1-01L
UIC N
--------- --
Compliance Reviewed By: _
Date: ) L.( tr N-M' ¡r-
-.- . .-------
.'-'
:----
)
)
,
~03-Q:)3
II (Pit
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation COmIll.
Attn.: Lisa Weepie
33 3 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
April 18,2003
RE: MWD Formation Evaluation Logs MPS-12 PBI,
1 LIS formatted Disc with verification listing.
API#: 50-029-23139-70
AK-MW-2309935
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
Date:
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-I
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
'~
RECEIVED
APR 2 9 2003
AJaaira Of; & G
~~ CoIIImieeiøn
~
)
)
d D3- ~3
I ! Co'!7
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
April 18, 2003
RE: MWD Formation Evaluation Logs l\1PS-12,
AK-MW-23 0993 5
1 LIS formatted Disc with verification listing.
API#: 50-029-23139-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
Sign~(Á¥
RECEIVED
APR 2 9 2003
Afaaka Of: & Gas Cons. Co~
Anchorage ''''''~n
)
,~
J
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator .~·:iífj· ¡, 7. Permit Number
BP Exploration (Alaska) Inc. g. ~Y~\~::>'=3i 203-023
3 Address "'~-~'--~"'-'-'.._-.._,\\~." I: 8. API Number
. \, ," ,'.', ~,
P.O. Box 196612, Anchorage, Alaska 99519-6612' ~ "'.;<.t5~.' .. 50- 029-23139-00
4. Location of well at surface ' " '"'' ,. " ", ",' 9. Unit or Lease Name
3334' NSL, 93' WEL, SEC. 12, T12N, R10E, UM X = 565917, Y = 6000002 Milne Point Unit
At top of productive interval .
5031' NSL, 3080' WEL, SEC. 07, T12N, R11 E, UM
At total depth
2351' NSL, 2912' WEL, SEC. 06, T12N, R11E,UM X = 567823, Y = 6004316
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff
KBE = 72.1' ADL 380110
12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband.
2-26-2003 3-5-2003 3-13-2003
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
8460 4298 FT 8460 4298 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR RES, ABI, IFR/CASANDRA
Classification of Service Well
X = 567689, Y = 6001716 10. Well Number
MPS-12
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1800' (Approx.)
23.
CASING
SIZE
20"
10-3/4"
7-5/8"
4-1/2"
WT. PER FT.
92#
45.5#
29.7#
12.7#
GRADE
H-40
L-80
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
Surface 112' 42"
35' 2241' 13-1/2"
33' 5780' 9-7/8"
5677' 8460' 6-1/8"
CEMENTING RECORD
260 sx Arctic Set (Approx.)
566 sx Class 'L', 230 sx Class 'G'
125 sx Class 'L', 392 sx Class 'G'
Uncemented Slotted Liner
AMOUNT PUllED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotter Liner
MD
TVD
MD
TVD
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2", 12.6#, L-80 5069'
3-1/2",9.2#, L-80 5069' - 5136' 5082'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
1800' Freeze Protected with 80 Bbls of Diesel
5785' - 8264'
4205' - 4284'
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
March 17, 2003 Flowing
Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl
3-23-2003 6 TEST PERIOD 2716 874 0
Flow Tubing Casing Pressure CALCULATED Oll-BBl GAs-McF WATER-BBl
Press. 24-HoUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. SUbmit~e E IVE 0
CHOKE SIZE
GAS-Oil RATIO
322
Oil GRAVITY-API (CORR)
No core samples were taken.
_BfL
l/~
APR 3 0 iUü3
APR 1 8 2003
Alaska Oil & Gas Cons. CommissiQn
Anchorage
Form 10-407 Rev. 07-01-80
OR: GINA-
Submit In Duplicate
')
29. Geologic Markers
Marker Name Measured True Vertical
Depth Depth
SBF2-NA 4790' 3955'
SBF21 4801' 3960'
Schrader Bluff NA Sand 4838' 3976'
SBF1-NB 4850' 3981'
SBF1-NBR 4859' 3985'
SBD4-NC 4927' 4013'
SBE41 4939' 4017'
SBD2-NE 4967' 4029'
SBE1-NF 5134' 4083'
TSBD-OA 5304' 4120'
TSBC 5511' 4158'
TSBB-OB 5718' 4194'
I, ,¡'J "II
31 . List of Attachments:
)
30.
Formation Tests
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
RECEIVED
APR 1 8 2003
Alaska Oil & Gas Cons. Commission
Anchorage
S,umrT)ary ofD~ily Drilling Reports, Surveys and a Leak-Off Integrity Test Summary.
32. I ~erebY certify ~~~!J~.!qreQOi~~..iS t~~e ~o.~-correct to the best of my knowledge
Signed SondL Stewman ~::/.- -. - -- Title Technical Assistant
~.___ \, eoi' c:::;:, ..{.
....__~...___ ,0
MPS-12 203-023
Well Number
Permit No. I Approval No.
INSTRUCTIONS
Date (-:)~/- [U' ' 03
Prepared By Name/Number:
Drilling Engineer:
Sondra Stewman, 564-4750
Steve Campbell, 564-4401
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
a1íachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 28: If no cores taken, indicate 'none'.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
Form 10-407 Rev. 07-01-80
OR G,NAL
)
)
Page 1 of 7
BP EXPLORATION
Operations.·Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
2/26/2003
2/27/2003
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
From - To Hours Task Code NPT Phase
10:00 - 15:00 5.00 MOB P PRE
15:00 - 16:30 1.50 RIGU P PRE
16:30 - 19:00 2.50 RIGU P PRE
19:00 - 21 :30 2.50 DRILL P SURF
21 :30 - 22:00 0.50 DRILL P SURF
22:00 - 22:30 0.50 DRILL P SURF
22:30 - 23:00 0.50 RIGU P PRE
23:00 - 00:00 1.00 DRILL P SURF
00:00 - 00:30 0.50 DRILL P SURF
00:30 - 02:00 1.50 DRILL P SURF
02:00 - 20:00 18.00 DRILL P SURF
20:00 - 21 :00 1.00 CASE P SURF
21 :00 - 22:30 1.50 CASE P SURF
22:30 - 23:00 0.50 CASE P SURF
23:00 - 00:00 1.00 CASE P SURF
2/28/2003 00:00 - 01 :30 1.50 CASE P SURF
01 :30 - 02:00 0.50 CASE P SURF
02:00 - 03:30 1.50 CASE P SURF
03:30 - 06:30 3.00 CASE P SURF
06:30 - 07:00 0.50 CEMT P SURF
07:00 - 07:30 0.50 CEMT P SURF
07:30 - 11 :00 3.50 CEMT P SURF
11 :00 - 13:30 2.50 CEMT P SURF
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Description of Operations
Rig Down, Move Off MPS-18 & Move Rig to MPS-12. Spot Rig
over Conductor. Skid Rig Floor.
RIG ACCEPTED @ 15:00 hRS 2/26/2003.
Fill Pits wI Mud & Water. RlU Rig Floor.
NIU Diverter & Lines, Spot Tiger Tank, Rockwasher, Sperry
Shack. Load Mud Bay.
Pick Up & M/U BHA. CIO Stab. Sleave, Install MWD
Electronics, Orient and adjust UBHO Sub
Pre Spud Meeting Held by Co. Rep wI All Drilling Hands on
Tour & all Service Co. Personnel.
RlU HES Slick Line Sheaves for Gyro Surveys.
Diverter Drill - Function Test. Witness waived by John Crisp,
AOGCC. Check for Leaks in riser & Flow Line.
CIO Conductor, Drill from 112' to 185'. 400 GPM @ 1000 psi.
50 RPM ART = 0.5 Hrs.
Drill from 185' to 276'. 400 GPM @ 1030 psi.
Stand Back HWDP & P/U 6 ea. DC's.
Drill from 276' to 1600', 400 GPM @ 1800 psi.
1600' to 2250' 500 GPM @ 2700 psi. Torque = 8K
P/U = 11 OK SIO = 108K ROT = 11 OK. RPM = 110, Motor =
75
AST = 0.75 Hrs. ART = 9.0 Hrs.
Took 6 Gyro Surveys: Last @ 882'.
Circulate Hole Clean 500 GPM @ 2300 psi.& 110 RPM.
Wiper Trip to 760'. No Problems.
Circulate Hole Clean - 500 GPM @ 2250 psi. & 110 RPM
POH to BHA. No Drag - Hole in good shape.
Lay Down BHA
Clear Floor, P/U Landing Jt & Hanger - Make Dummy Run
PJSM with all Hands. RlU to run 10 3/4" Casing
Run 53 Jts. 45.5#, L-80, BTC Surface Casing.
P/U Hanger & Landing Jt. Land Casing. Shoe @ 2240'
Correct Displacement and filling pipe Throughout.
Circulate Bottoms up - 6 BPM @ 400 psi.wl Franks Tool
Reciprocate Pipe.
RID Franks Tool M/U Cement Head.
Circulate & Condition Mud for Cement Job. Cut Vis to 53 sec.
Cut YP to 9. Circ @ 6 BPM Final Pressure - 180 psi.
Turn over to Halliburton & Cement as Follows
Pumping @ 5 to 7 BPM:
Pump 5 Bbls Water
Test Lines to 3500 psi.
Pump 15 Bbls Water
Mix & Pump 50 Bbls ALPHA Spacer, weighted to 10.2 ppg.
Drop Bottom Plug
Mix & Pump 421 Bbls.(566 sx) PERMAFROST "L" Slurry @
10.7 ppg.
Cement Returns to Surface:
Mix & Pump 47 Bbls. (230 sx), Class "G" Premium Slurry @
15.8 ppg. with 2% Calcium Chloride.
Drop Top Plug
Flush HOWCO Lines w/1 0 Bbls. water
Switch to Rig and Displace wI 208 BBls Mud @ 7 Bbls/Min.
Printed: 3/1712003 8:52:53 AM
)
BP EXPLORATION
Operations Summary Report
Page 2 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
2/28/2003 11 :00 - 13:30 2.50 CEMT P SURF Reciprocating Casing Throughout Job.
Slowed down to 2 BPM for last 10 BBls. Final pressure 420 psi.
Bumped Plug wI 1420 psi. Check Floats - OK.
Est. Total 254 BBls Cement to Surface.
13:30 - 15:00 1.50 CEMT P SURF Lay down landing Jt. & Flush Stack
15:00 - 16:30 1.50 CASE P SURF N/D Diverter & Associated Equipment
16:30 - 17:00 0.50 CASE P SURF N/U FMC GEN-5 Casing 1 Tubing Heads. Test Metal to Metal
Seals to 1000 psi.
17:00 - 19:00 2.00 CASE P SURF N/U 135/8",5000 psi BOPE.
19:00 - 19:30 0.50 BOPSUR P SURF RIU to Test BOPE.
19:30 - 00:00 4.50 BOPSUR P SURF Test BOPE to 250 - 4000 psi. I Annular to 250 - 2500 psi.
Witness of Test waived by John Crisp - AOGCC.
3/1/2003 00:00 - 00:30 0.50 CASE P SURF Install 1 0" ID wear Bushing.
00:30 - 03:00 2.50 CASE P SURF P/U & M/U BHA. Motor with Bend of 1.5 Deg in bind going into
103/4" 45.5 # Casing. Re-Adjust Motor Bend from 1.5 Deg to
1.22 Deg. Tight, but OK. M/U & RIH wI rest of BHA.
03:00 - 03:30 0.50 CASE P SURF CIO Elevators to 4". P/U 1 Jt. DP & Function test MWD - OK.
03:30 - 04:30 1.00 CASE P SURF RIH to 2061' Picking up 4" DP from Shed.
04:30 - 05:30 1.00 CASE P SURF Slip & Cut Drilling Line. Service Top Drive.
05:30 - 06:30 1.00 CASE P SURF RIU & Test 103/4" Casing to 2500 psi. for 30 minutes.
06:30 - 07:30 1.00 CASE P SURF Drill Shoe Track to 2240'. Very Clabbered Mud.
07:30 - 09:30 2.00 CASE P SURF Circulate & Condition Mud.
09:30 - 10:00 0.50 CASE P SURF Clean out Rat Hole to 2250 and Dr1l20' of new Hole to 2270'.
10:00 - 10:30 0.50 CASE P SURF CBU in preparation for FIT.
10:30 - 11 :30 1.00 CASE P SURF Perform FIT. Surface pressure of 270 psi. wI 9.2 ppg Mud =
an EMW of 11.52 ppg @ 2240 TVD.
11 :30 - 00:00 12.50 DRILL P INT1 Directional Drill 9 7/8" Hole from 2270' to 4169'.
@ 4169': 500 GPM @ 3300 psi. Torque = 9K RPM = 110
P/U = 115 K, SIO = 98K, ROT = 110K.
AST = 4.75 Hrs. ART = 2.92 Hrs.
3/2/2003 00:00 - 01 :00 1.00 DRILL P INT1 Circulate Bottoms Up to clean Hole @ 500 GPM & 110 RPM.
Pressure Dropped from 3300 psi to 3150 psi.
01 :00 - 18:00 17.00 DRILL P INT1 Directional Drill from 4169' to 5789'. 509 GPM @ 3420 psi.
P/U = 124K, SIO = 95K, ROT = 113K Torque = 6.5K, 110
RPM
AST = 8.5 Hrs. ART = 2.75 Hrs.
18:00 - 20:00 2.00 CASE P INT1 Circulate Lol Hi Vis. Sweep @ 509 GPM, Reciprocating Pipe
@ 110 RPM. ICP = 3200 psi. , FCP = 3040 psi.
20:00 - 23:00 3.00 CASE P INT1 Pump out of Hole to Shoe @ 2240'.509 GPM, ICP = 3040 psi.
FCP = 1620 psi.
23:00 - 00:00 1.00 CASE P INT1 RIH to 4650'. No obstuctions.
3/3/2003 00:00 - 00:30 0.50 CASE P INT1 RIH to 5789'.
00:30 - 02:00 1.50 CASE P INT1 CBU, Circulate Lo/Hi Vis Sweep. 509 GPM, Rotate @ 110
RPM, Reciprocate 90'. Pressure 3230 psi.
02:00 - 06:00 4.00 CASE P INT1 Pump out of Hole to Shoe @ 509 GPM.
06:00 - 06:30 0.50 CASE P INT1 CBU at Shoe @ 2240'. Good load of cuttings over shaker.
06:30 - 07:30 1.00 CASE P INT1 Pump Slug. POH to HWDP ( 724').
07:30 - 09:30 2.00 CASE P INT1 UD BHA.
09:30 - 11 :00 1.50 CASE P INT1 Pull Wear Bushing, Install Test Plug. CIO Top Rams to 7 5/8".
Test Bonnet Seals to 3500 psi.
11:00 -13:00 2.00 CASE P INT1 RlU to run 7 5/8" casing. Make dummy run wI Hgr & landing Jt.
Printed: 3/1712003 8:52:53 AM
')
')
BP EXPLORATION
Operations Summary Report
Page 3 of?
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
3/312003 11 :00 - 13:00 2.00 CASE P INT1
13:00 - 15:30 2.50 CASE P INT1 Run 7 5/8" Casing as per program to Shoe @ 2240'.
15:30 - 16:00 0.50 CASE P INT1 CBU - 6 BPM @ 420 psi. P/U = 11 OK, S/O = 106K
16:00 - 20:00 4.00 CASE P INT1 Run total 140 Jts, 7 5/8", 29.7#, L-80, BTC-M Casing to 5780'.
precautionarily Wash last Jt to bottom. No Fill - Hole Slick.
20:00 - 20:30 0.50 CASE P INT1 RID Franks Tool I RlU Cement Head.
20:30 - 23:00 2.50 CASE P INT1 C&C Mud @ 6 BPM start @ 350 psi. - down to 300 psi wI YP
at 14. P/U = 175K, S/O = 125K.
23:00 - 00:00 1.00 CEMT P INT1 Turn over to HOWCO and Cement as Follows:
Pump 5 Bbls Water
Test Lines to 3500 psi.
Mix & Pump 30 Bbls ALPHA spacer weighted @ 10.2 ppg.
Drop Bottom Plug
Mix & Pump 49 Bbls ( 125 sx) Permafrost "E" slurry @ 12.0
ppg., yield 2.17
Mix & Pump 85 Bbls. (392 sx) Premium slurry, @ 15.6 ppg.
yield 1.22 wI 3% KCL, 2% Cal-Seal, & 0.5% LAP-1.
Both sluuries pumped @ 5-6 BPM.
Drop Top Plug & chase w/1 0 Bbls water to clear HOWCO
lines.
Switch back to Rig & continue displacing w/252 Bbls MUd @ 7
BPM. FCP 590 psi. Bumped Plug wI 1600 psi. Floats OK
100 % Returns Throughout Job
Reciprocated pipe Throughout Job. CIP - 00:15 Hrs.
3/4/2003 00:00 - 00:30 0.50 CEMT P INT1 Displacing wI 252 Bbls mud @ 7 BPM. FCP 590 psi. Bumped
Plug wI 1600 psi. Floats OK
100 % Returns Throughout Job
Reciprocated pipe Throughout Job. CIP - 00:15 Hrs.
00:30 - 01 :00 0.50 CEMT P INT1 Lay down cement head and landing jt.
01 :00 - 02:00 1.00 BOPSURP INT1 Install 7 5/8 packott assy. test to 5000 psi
02:00 - 03:30 1.50 BOPSUFP INT1 Change out top rams to 2718 x 5" variables, test door seals to
4,000 psi
03:30 - 04:00 0.50 BOPSURP INT1 Lay down test jt, install wear ring
04:00 - 06:00 2.00 CASE P INT1 Picking up BHA #3 , test MWD
06:00 - 09:30 3.50 CASE P INT1 Picking up 111 jts 4" pipe from pipe shed ,Trip in to 5,657'
09:30 - 10:30 1.00 CASE P INT1 Circ for csg test
10:30 -11 :30 1.00 CASE P INT1 Test csg to 3,500 psi for 30 min. good test
11 :30 - 13:00 1.50 DRILL P PROD1 Drill cement float @ 5,697' and shoe @ 5,779', 20 ft of new
hole to 5,809'
13:00 - 14:00 1.00 DRILL P PROD1 Circ and FIT test MW 9.3, 400 psi, 4207 TVD, =11.0 EMW
14:00 - 00:00 10.00 DRILL P PROD1 Drilling 5809' to 6902' with 240 gals min,1850 psi, 80 rpms, 4-5
K bit wt., AST 1.5 ART 5.25, TO. 4K P/U 120K S/O 75K RfT
100K
3/5/2003 00:00 - 11 :00 11.00 DRILL P PROD1 Drilling 6902' to 8200' with 240 gals min, 2,000 psi, 80 rpms
11 :00 - 11 :30 0.50 DRILL P PROD1 Circ, while Geologist consults town
11 :30 - 17:30 6.00 DRILL P PROD1 Drilling 8200' to 8,727' with 240 gals min, 2,000 psi, 80 rpms
drill out top of sand @ 8,160, drill to 8,727 no sand built to 97
degrees AST 3.25 ART 6.75
17:30 - 18:00 0.50 DRILL P PROD1 Circ
18:00 - 19:00 1.00 DRILL P PROD1 Pump out to 8054 to side track well
19:00 - 20:00 1.00 DRILL P PROD1 Side tracking well @ 8066 to 8,101 low side well
20:00 - 23:30 3.50 DRILL P PROD1 Drilling 8,101' to 8,460' TD with 240 gals min, 2,000 psi, 80
rpms, Cross Fault 8,380' ART 1.25, AST 1 TO 6K P/U 122K
Printed: 311712003 6:52:53 AM
),
)
BP EXPLORATION
O.perationsSummary Report
Page 4 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
3/5/2003 20:00 - 23:30 3.50 DRILL P PROD1 S/O 55k RIT 100k
23:30 - 00:00 0.50 DRILL P PROD1 Circ, with 240 gals min. 2,000 psi 100 rpms well started taking
mud @ 50 bbls hr. slowed pumps to 200 gals min. 1500 psi
well taking 25 to 30 bbls hr. lost total 25 bbls
3/6/2003 00:00 - 02:00 2.00 CASE P COMP Circ, with 240 gals min. 2000 psi 100 rpms well started taking
mud @ 50 bbls hr. slowed pumps to 200 gals min. 1500 psi
well taking 25 to 30 bbls hr., circ 2.5 bottoms up
02:00 - 05:00 3.00 CASE P COMP Pumping out of hole to shoe 5779, with 200 gals min 1500 psi
spotting 40 bbl CaC03 with 35 ppb mud wt 9.5 in open hole
while pumping to shoe. Total overall lost to well 1 00 bbls
05:00 - 05:30 0.50 CASE P COMP Monitor well, static
05:30 - 06:30 1.00 CASE P COMP Circ, bottoms up, no losses
06:30 - 07:30 1.00 CASE P COMP Cut drilling line
07:30 - 10:00 2.50 CASE P COMP Drop rabbit, POH
10:00 - 11 :00 1.00 CASE P COMP Stand back flex dC.,lay down MWD, Mud motor
11 :00 - 14:00 3.00 CASE P COMP Pick up slotted liner, 4.5 12.6# L-80 IBT, total of 5 solid jts and
60 slotted, 2 solid jts, baker 5.5 HMC liner hanger, Baker 5.5 x
7 5/8 ZXP liner top packer
14:00 -15:30 1.50 CASE P COMP Trip in with liner to 5,779
15:30 - 16:00 0.50 CASE P COMP Circ drill pipe Volume, get P/U and S/O wts
16:00 - 17:30 1.50 CASE P COMP Trip in with liner to 8,460' no problems
17:30 - 18:00 0.50 CASE P COMP Drop ball, circ, set liner hanger, packer and release liner, top of
liner 5,677'
18:00 - 20:00 2.00 CASE P COMP Tripping out with liner setting tools, lay down same
20:00 - 00:00 4.00 CASE P COMP Pull wear ring, Testing BOPS and manifold 250-4,000 psi
Annular 250-2500 psi, Witness of test was waiver by John
Spaulding AOGCC, one repair of valve # 14 had to be changed
out
317/2003 00:00 - 01 :30 1.50 CASE P COMP Testing BOP and manifold 250-4,000 psi Annular 250-2500 psi.
Witness of test was waiver by John Spaulding AOGCC.
Repair valve # 14, change out same. Install wear ring.
01 :30 - 05:30 4.00 STWHIP P PROD2 Picking up space out tail pipe and Whipstock and mills, MWD
and 4 3/4" drill collars.
05:30 - 06:00 0.50 STWHIP P PROD2 Surface test MWD.
06:00 - 10:00 4.00 STWHIP P PROD2 Tripping in with Whipstock at 2 min. per stand, fill pipe every 10
stands.
10:00 - 10:30 0.50 STWHIP P PROD2 Orient Whipstock, set trip anchor with 18K down, set down,
shear Whipstock pin.
10:30 - 15:30 5.00 STWHIP P PROD2 Milling window. Top of window at 5,270', bottom window
5,282', total depth 5,299', "OA" sand top 5,279'.
15:30 - 17:00 1.50 STWHIP P PROD2 Circulate, work 6 3/4" mills across window, pump sweeps.
17:00 - 19:30 2.50 STWHIP P PROD2 Tripping out with mills and lay down same
19:30 - 21 :30 2.00 DRILL P PROD2 Pick up BOP jet washer tool and super magnet, flush BOP.
21 :30 - 23:00 1.50 DRILL P PROD2 Pick up BHA #5, surface test MWD.
23:00 - 00:00 1.00 DRILL P PROD2 Tripping in with BHA #5
3/8/2003 00:00 - 01 :00 1.00 DRILL P PROD2 Tripping in with BHA #5 to window @ 5,270
01 :00 - 01 :30 0.50 DRILL P PROD2 Orient bit and slide thru window, no problems
01 :30 - 00:00 22.50 DRILL P PROD2 Drilling 5,299' to 8,056' with 240 gall min 2100 psi, 4-5k bit wt,
80 rpm.,Ta 5,500 AST 5, ART 7, 100 % sand
3/9/2003 00:00 - 00:30 0.50 DRILL P PROD2 Drilling 8,056' to 8,150 TD with 240 gall min 2100 psi, 4-5k bit
wt, 80 rpm.
00:30 - 02:30 2.00 CASE P COMP Circ. Three bottoms up with 240 gals min. 2100 psi 100 rpms
02:30 - 05:30 3.00 CASE P COMP Pumping out to window with full drilling rate. pull across window
Printed: 3/1712003 8:52:53 AM
Ii'"
"
)1
BP EXPLORATION
Operations Summary Report
Page 5 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
3/912003 02:30 - 05:30 3.00 CASE P COMP with out pumping
05:30 - 06:30 1.00 CASE P COMP Circ. bottoms up @ 5211' 250 gals min.
06:30 - 08:30 2.00 CASE P COMP Tripping out
08:30 - 10:30 2.00 CASE P COMP Laying down BHA
10:30 -12:00 1.50 CASE P COMP Picking up Whipstock Retrieval BHA
12:00 - 13:30 1.50 CASE P COMP Tripping in to 5,200'
13:30 - 17:00 3.50 CASE P COMP Orientate MWD, attempt to hook Whipstock. Made several
attempts, wash slot on slide, orient 360 deg make several
attempts with no success.
17:00 - 19:00 2.00 CASE N DFAL COMP POH
19:00 - 22:00 3.00 CASE N DFAL COMP Trip out with BHA. Did not recover Whipstock, lay down MWD,
1 jt 3.5 hw., Whipstock hook.
22:00 - 23:30 1.50 CASE P COMP Slip and cut drill line, service top drive
23:30 - 00:00 0.50 CASE N DFAL COMP Change Whipstock retrieval BHA, picked up new hook with
bend and change out 3 .5 HW jt to plain 3.5 jt.
3/10/2003 00:00 - 02:30 2.50 CASE N DFAL COMP Tripping in with new Whipstock hook BHA.
02:30 - 03:30 1.00 CASE N DFAL COMP Circ and Orient Whipstock hook, pump 10 bbls H20, wash
Whipstock key way, latch Whipstock, jarred twice with 50,000
Ib overpull, came free. Gain 12,000 lb. string wt.
03:30 - 04:00 0.50 CASE N DFAL COMP Circ bottoms up.
04:00 - 07:30 3.50 CASE P COMP POH with Whipstock
07:30 - 11 :00 3.50 CASE P COMP Laying down whipstock, and tain pipe space out.
11 :00 - 11 :30 0.50 CASE P COMP PJSM, rig to run 4.5 liner
11 :30 - 15:00 3.50 CASE P COMP Picking up 4.5 liner 68 jts.12.6# L-80 IBT slotted and Baker 7"
Hook Hanger
15:00 - 18:00 3.00 CASE P COMP Tripping in with liner, went thru window no problem, liner shoe
8,102', liner top 5,247'. Down wt 93,000 pick up wt. 125,000,
hook window on second try.
18:00 - 19:00 1.00 CASE P COMP Drop ball and pump down @ 3 bbls min. pressure up to 2,600
psi and release liner. Pull up 10ft and sheared ball with 3,600
ps, pick up wt. 110,000#
19:00 - 19:30 0.50 CASE P COMP Circ bottons up and slug pipe
19:30 - 20:30 1.00 CASE N DFAL COMP Attempt to pull out and liner running tool, hanging up on
diverter collet that should release wt 15,000# overpull
working pipe up to 150,000 pick up, unhooked liner one time
and re hook
20:30 - 00:00 3.50 CASE N DFAL COMP Circ 5 bbls min. 550 psi, Waiting and giving time for liner to
wall stick.
3/11/2003 00:00 - 00:30 0.50 CASE N DFAL COMP Circ 5 bbls min. 550 psi, Waiting and giving time for liner to
wall stick.
00:30 - 01 :00 0.50 CASE N DFAL COMP Trying to pull free from hanger, pull at 5,000# stages starting
with 150,000# when we got to 165,000 the liner come
unhooked and started coming up hole, re hook liner and picked
up again and liner moved with 125,000 pull, rehook liner and
circ. Called town
01 :00 - 05:00 4.00 CASE N DFAL COMP Pulling out of hole with liner, no problems
05:00 - 06:00 1.00 CASE N DFAL COMP Laying down, Baker hanger
06:00 - 10:30 4.50 CASE N DFAL COMP Wait on new Baker hanger
10:30 - 11 :30 1.00 CASE N DFAL COMP Picking up new Baker 7 5/8 hookwallliner hanger
11 :30 - 12:30 1.00 CASE N DFAL COMP Tripping hole 26 sds.drill pipe to top of window @ 5,270'
12:30 - 15:00 2.50 CASE N DFAL COMP Attempt to exit window, found window after 5th try, space shoe
in middle of window and rot. with no indication of TQ spikes,
worked pipe at 1/2 turns till exit on 5th try
Printed: 3/1712003 8:52:53 AM
)
)
BP EXPLORATION
Operations Summary Report
Page 6 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
3/11/2003 15:00 - 15:30 0.50 CASE N DFAL CaMP Trip into open hole with liner P/U wt 125K SIO 95K , hook liner
@ 5,282' liner top @ 5,247', shoe @ 8,102'
15:30 - 16:30 1.00 CASE N DFAL CaMP Drop 29/32 ball, pumped down @ 1 112 bbl min. to ball seat,
release liner with 2600 psi, free P/U wt 110,000, collet pulled
with 130,000, shear ball with 3,850 psi, stand back one stand
16:30 - 19:30 3.00 CASE P CaMP Slug pipe tripping out, layed down excess pipe
19:30 - 21 :00 1.50 CASE P COMP Tripping in with DCs and laid down same
21 :00 - 22:30 1.50 CASE P CaMP Trip in hole open with 4" drill pipe
22:30 - 23:30 1.00 CASE N HMAN CaMP Pick up Halliburton 7 5/8 storm packer and hang drll pipe off @
4982', to secure well.
23:30 - 00:00 0.50 CASE N CaMP Pull wear ring, Nipple down BOPs
3/12/2003 00:00 - 01 :30 1.50 CASE N CaMP Nipple down BOPs
01 :30 - 03:00 1.50 CASE N CaMP Nipple down Tubing spool and Orient tubing spool valves North
and South, nipple tubing spool back up, test to 5000 psi for 10
min.
Nipple up BOPS
03:00 - 04:30 1.50 CASE N CaMP Rig up and test choke lines and upper tubing spool flange to
250-4,000 psi
04:30 - 05:00 0.50 CASE N CaMP Rig up, pull Halliburton storm packer and laydown
05:00 - 05:30 0.50 CASE P CaMP Trip in to 5,237
05:30 - 08:00 2.50 CASE P CaMP Displace well with two hole volumes wI 8.8 brine follow by 9.2
brine with 25 gals per 100 bbls corrosion inhibitor, Rot. 120
rpms 10 bbls min.
08:00 - 11 :00 3.00 CASE P CaMP Monitor well, Tripping out, stand back 20 stands in derrick, lay
down rest of pipe
11 :00 - 12:30 1.50 CASE P CaMP Slip and cut drill line
12:30 - 14:00 1.50 CASE P CaMP Finish laying down drill pipe, pull wear ring
14:00 - 15:00 1.00 RUNCOrvP COMP Rig up to run 4.5 completion, PJSM on running completion
15:00 - 23:30 8.50 RUNCOfvP CaMP Picking up 4.5 completion, 3.5 wire line entry guide @ 5135,
XN nipple 3.5 @5131, 7518 x 4.5 Baker Premier Packer@
5088, otis X nipple@ 5072, Phoenix jet pump gauge sensor@
5060, XD sliding sleeve@ 5040, Phoenix pressure gauge@
5026, 71 jts 4.5 12.6 L-80 IBT tubing, 4.5 KGB-2 GLM wI RP
valve@ 2077, 49 jts 4.512.6 L-80 IBT tubing, FMC hanger Gen
6, I-wire clamps 68, P/U wt. 95K SIO wt.90K Block wt 50K
23:30 - 00:00 0.50 RUNCOfvP CaMP M/U hanger and landing jt., M/U I-Wire connect
3/13/2003 00:00 - 01 :30 1.50 RUNCOfvP CaMP M/U I-Wire connect, Land 4.5 completion, with TWC in place
01 :30 - 02:30 1.00 RUNCOfvP CaMP Test TWC with 1000 Psi, Blow down all service lines, choke
lines, hole fill lines
02:30 - 03:30 1.00 RUNCOrvP CaMP Nipple down and set back bops
03:30 - 06:00 2.50 RUNCOfvP CaMP Nipple up Fmc 11" X 41/165,000 tubing head adapter test to
5,000 psi, nipple up CIW 4 1/165,000 psi tree, test tree to
5,000 psi
06:00 - 06:30 0.50 RUNCOfvP CaMP Pull TWC, pull with dry rod
06:30 - 08:00 1.50 RUNCOfvP CaMP Drop ball to set packer, pressure up to 4,000 psi set packer at
5,081' and test tubing, recorded press for 30 min., Bleed
pressure back to 2,500, pressure up on annulus to 4,500 psi
recorded press for 30 min., bleed tubing presure off and shear
rp valve shear@ 2,500 psi
08:00 - 09:00 1.00 RUNCOfvP CaMP Pump 80 bbls diesel down annulus, taking returns up tubing
2.5 bbls min. 2500 psi diesed @ 1800 ft.
09:00 - 10:00 1.00 RUNCOfvP CaMP U-tube diesel F/annulus to tubing, shut in tubing=120psi-shut
annulus 120psi
Printed: 3/1712003 8:52:53 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
)
')
BP EXPLORATION
Operations Summary Report
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
From- To Hours Task Code NPT Phase
3/13/2003 10:00 - 11 :00
11:00 -12:00
Page 7 of 7
Spud Date: 2/26/2003
End:
Description of Operations
1.00 RUNCOM'
1.00 RUNCOM'
COMP Rlu lubricator set CIW 4" type H BPV, rig down lubricator
COMP Secure well, clean cellar, Rig released @ 12:003/13/2003
Printed: 3/1712003 8:52:53 AM
Legal Name: MPS-12
Common Name: MPS-12
Test Date
3/1/2003
3/4/2002
FIT
FIT
Test Type
Test Depth (TMD)
2,240.0 (ft)
5,809.0 (ft)
BP . EXPLORA TION
Leak-Off"esf$umm~.ry
TestPepth (TVD)
2.240.0 (ft)
4,207.0 (ft)
AMW
9.20 (ppg)
9.30 (ppg)
SurfaèePressure
270 (psi)
400 (psi)
Leak Off Pressure (BHP)
1,341 (psi)
2,432 (psi)
Page 1 of 1
EMW
11.52 (ppg)
11.13 (ppg)
.~
~'
Printed: 3/1712003 8:52:46 AM
)
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well MPS-12
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
8,460.00' MD
(if applicable)
'}
16-Apr-03
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
¡.,"~~:.;~ fo·"'·':: :,-,.,
"" ,~:=)., '-. ,:....
/\ ;., ~')~ :',..- - ~ :.
\"".,', ....-\ ",'
. ," 1- ~ ;'t' ..
~ .' ~ . .' . .;
aù&-ðd3
......,\:
, . ,_. . ......~-,
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-12
--
Job No. AKZZ2309935, Surveyed: 5 March, 2003
Survey Report
15 April, 2003
Your Ref: API 500292313900
Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.~_r
Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid)
Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True)
Kelly Bushing: 72. 60ft above Mean Sea Level
Elevation relative to Project V Reference: 72.60ft
Elevation relative to Structure: 72.60ft
Sr---t I""Y-SUI!
DR fLLTN"G:--SEAvl c: es
A Halliburton Company
Survey Ref: svy1151
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12
Your Ref: API 500292313900
Job No. AKZZ2309935, Surveyed: 5 March, 2003
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft)
8034.07 86.970 25.820 4189.64 4262.24 3923.39 N 1742.60 E 6003940.87 N 567625.22 E 4291.40 Tie On Point
8066.00 86.970 25.860 4191.33 4263.93 3952.08 N 1756.50 E 6003969.69 N 567638.87 E 0.125 4323.28 Window Point
8084.57 85.240 25.750 4192.59 4265.19 3968.76 N 1764.56 E 6003986.44 N 567646.79 E 9.335 4341.81
8132.22 83.810 27.100 4197.13 4269.73 4011.24 N 1785.67 E 6004029.10 N 567667.52 E 4.118 4389.23
8179.76 84.000 26.690 4202.18 4274.78 4053.40 N 1807.05 E 6004071 .45 N 567688.53 E 0.946 4436.49
8228.93 83.570 29.330 4207.51 4280.11 4096.55 N 1830.01 E 6004114.80 N 567711 .10 E 5.409 4485.32 ~
8277.12 84.310 29.120 4212.59 4285.19 4138.37 N 1853.40 E 6004156.82 N 567734.13 E 1.596 4533.14
8326.29 86.420 29.850 4216.57 4289.17 4181.03 N 1877.52 E 6004199.69 N 567757.87 E 4.539 4582.03
8370.90 86.300 29.660 4219.40 4292.00 4219.68 N 1899.62 E 6004238.54 N 567779.62 E 0.503 4626.42
8391.21 86.420 30.050 4220.69 4293.29 4237.26 N 1909.71 E 6004256.21 N 567789.56 E 2.005 4646.63
8460.00 86.420 30.050 4224.98 4297.58 4296.68 N 1944.09 E 6004315.93 N 567823.41 E 0.000 4715.07 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 25.500° (True).
Magnetic Declination at Surface is 25.583°(26-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 8460.00ft.,
The Bottom Hole Displacement is 4716.03ft., in the Direction of 24.345° (True).
'---
15 April, 2003 - 11:10
Page2of3
DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12
Your Ref: API 500292313900
Job No. AKZZ2309935, Surveyed: 5 March, 2003
BP EXPLORA nON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
8034.07
8066.00
8460.00
4262.24
4263.93
4297.58
3923.39 N
3952.08 N
4296.68 N
1742.60 E
1756.50 E
1944.09 E
Tie On Point
Window Point
Projected Survey
-
Survey tool program for MPS-12
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
882.00
0.00
881.94
882.00
8460.00
881.94 Tolerable Gyro (MPS-12PB1 Gyro)
4297.58 AK-6 BP _IFR-AK (MPS-12PB1)
-
15 April, 2003 - 11 :10
Page 3 of 3
DríllQuest 3.03.02.005
)
)
go 3~W3
16-Apr-03
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-12 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
8,460.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
&' ""'t ,¡;-" "'~'., ~'W" ~ ';
f\'~~: :l:;.~;~ :1".,); .l:~~'.;; \
,,!,·~'·'C)
Attachment(s)
~ .~' r:~ ;:-)
'. t.. ~ :
;J 3 :~: ~ .;,~ . ~~,;~\
/ ;', , .~ ~. ", ....~ ~ ':1"'" .,' '" .
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-12 MWD
'-'
Job No. AKMW2309935, Surveyed: 5 March, 2003
Survey Report
15 April, 2003
Your Ref: API 500292313900
Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid)
Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True)
Kelly Bushing: 72. 60ft above Mean Sea Level
Elevation relative to Project V Reference: 72.60ft
Elevation relative to Structure: 72.60ft
=¡ ...... '''''V-5LJr1
D'R I L-L IN G . nSER\/IC:~S
A Halliburton Company
Survey Ref: svy1152
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12 MWD
Your Ref: API 500292313900
Job No. AKMW2309935, Surveyed: 5 March, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
8034.07 86.970 25.600 4189.64 4262.24 3912.97 N 1767.07 E 6003930.67 N 567649.79 E 4292.53 Tie On Point
8066.00 86.970 25.860 4191.33 4263.93 3941.69 N 1780.91 E 6003959.52 N 567663.37 E 0.813 4324.42 Window Point
8084.57 85.240 26.030 4192.59 4265.19 3958.35 N 1789.02 E 6003976.25 N 567671.33 E 9.361 4342.94
8132.22 83.810 27.500 4197.13 4269.73 4000.70 N 1810.38 E 6004018.78 N 567692.32 E 4.294 4390.36
8179.76 84.000 27.040 4202.18 4274.78 4042.72 N 1832.04 E 6004060.99 N 567713.60 E 1.042 4437.61
8228.93 83.570 29.970 4207.51 4280.11 4085.67 N 1855.36 E 6004104.15 N 567736.55 E 5.988 4486.42 --
8277.12 84.310 29.640 4212.59 4285.19 4127.25 N 1879.18 E 6004145.94 N 567760.00 E 1.680 4534.20
8326.29 86.420 30.460 4216.57 4289.17 4169.67 N 1903.72 E 6004188.57 N 567784.16 E 4.602 4583.06
8370.90 86.300 30.350 4219.40 4292.00 4208.07 N 1926.25 E 6004227.16 N 567806.36 E 0.365 4627.41
8391.21 86.420 30.900 4220.69 4293.29 4225.51 N 1936.58 E 6004244.70 N 567816.53 E 2.766 4647.60
8460.00 86.420 30.900 4224.98 4297.58 4284.42 N 1971.83 E 6004303.92 N 567851.26 E 0.000 4715.95 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 25.500° (True).
Magnetic Declination at Surface is 25.583°(26-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 8460.00ft.,
The Bottom Hole Displacement is 4716.40ft., in the Direction of 24.713° (True).
15 April, 2003 - 11:11
Page2of3
DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12 MWD
Your Ref: API 500292313900
Job No. AKMW2309935, Surveyed: 5 March, 2003
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
8034.07
8066.00
8460.00
4262.24
4263.93
4297.58
3912.97 N
3941.69 N
4284.42 N
1767.07 E
1780.91 E
1971.83 E
Tie On Point
Window Point
Projected Survey
-
Survey tool program for MPS-12 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
882.00
0.00
881.94
882.00
8460.00
881.94 Tolerable Gyro (MPS-12PB1 Gyro)
4297.58 MWD Magnetic (MPS-12PB1 MWD)
--
15 April, 2003 - 11:11
Page 3 of 3
DrillQuest 3.03.02.005
)
)
~O&Cb>3
16-Apr-03
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITVE
Re: Distribution of Survey Data for Well MPS-12 PB1 GYRO
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' M D (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECE~'/ED
APR 2 2 2003
A1aoka em & Gas Cons. Commission
AoChofsge
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-12PB1 Gyro
"--'
Job No. 2309935, Surveyed: 5 March, 2003
Survey Report
15 April, 2003
Your Ref: API 500292313970
Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
. j
--
Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid)
Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True)
Kelly Bushing: 72.60ft above Mean Sea Level
Elevation relative to Project V Reference: 72.60ft
Elevation relative to Structure: 72.60ft
5r'P............y-5LJr1
DFflLLíNG 'SEAVrC:es
A Halliburton Company
Survey Ref: svy1147
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1 Gyro
Your Ref: API 500292313970
Job No. 2309935, Surveyed: 5 March, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft)
0.00 0.000 0.000 -72.60 0.00 0.00 N 0.00 E 6000002.26 N 565917.32 E 0.00 Tolerable Gyro
150.00 0.200 210.000 77.40 150.00 0.23 S 0.13W 6000002.03 N 565917.19 E 0.133 -0.26
329.00 0.600 188.000 256.40 329.00 1 .43 S 0.42 W 6000000.83 N 565916.92 E 0.235 -1.47
419.00 0.750 180.000 346.39 418.99 2.48 S 0.48 W 5999999.77 N 565916.86 E 0.196 -2.45
601.00 1.000 173.000 528.37 600.97 5.25 S 0.29W 5999997.01 N 565917.08 E 0.149 -4.86
691.00 0.600 146.000 618.36 690.96 6.42 S 0.07 E 5999995.84 N 565917.45 E 0.599 -5.76
882.00 1.250 47.000 809.34 881.94 5.83 S 2.15 E 5999996.45 N 565919.52 E 0.769 -4.33
----"
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 25.500° (True).
Magnetic Declination at Surface is 25.583°(26-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 882.00ft.,
The Bottom Hole Displacement is 6.21ft., in the Direction of 159.725° (True).
Survey tool program for MPS-12PB1 Gyro
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
"'-~./
0.00
0.00
882.00
881.94 Tolerable Gyro
15 April, 2003 - 10:54
Page 2 of 2
DrillQuest 3.03.02.005
')
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well MPS-12 PB1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
8,727.00' MD
(if applicable)
')
ao8-Ò~3
16-Apr-03
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
5'- f,~. "~W-I\/~ -"-'- .....'"<:\
~'~F'" ij "í:\"",. 1/ t:U~ r
.. )r '\.. .¿f~-' I., .
[~ ','''''~'' ~ - ,,'
APR 2 2 2003
;~a$Ka ü¡-j &. Gas Cons. {))mmiækm
,Anchorage.
,.
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-12PB1
-'
Job No. AKZZ2309935, Surveyed: 5 March, 2003
Survey Report
15 April, 2003
Your Ref: API 500292313970
Surface Coordinates: 6000002.26 H, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
--"
Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid)
Surface Coordinates relative to Structure: 31.03 H, 427.42 W (True)
Kelly Bushing: 72. 60ft above Mean Sea Level
Elevation relative to Project V Reference: 72.60ft
Elevation relative to Structure: 72.60ft
Sï ........ ''''''Y-SLJI'1
DArLL(NG^ 'slJæE:ívìces
A Halliburton Company
Survey Ref: svy1149
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1
Your Ref: AP/500292313970
Job No. AKZZ2309935, Surveyed: 5 March, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
882.00 1.250 47.000 809.34 881.94 5.838 2.15 E 5999996.45 N 565919.52 E -4.33 AK-6 BP _IFR-AK
1009.08 0.440 43.110 936.41 1009.01 4.538 3.50 E 5999997.77 N 565920.86 E 0.639 -2.58
1105.25 0.570 63.720 1032.57 1105.17 4.048 4.18 E 5999998.25 N 565921.54 E 0.230 -1.85
1202.63 0.460 49.520 1129.95 1202.55 3.588 4.91 E 5999998.73 N 565922.26 E 0.172 -1.11
1298.35 0.250 40.460 1225.67 1298.27 3.178 5.34 E 5999999.14 N 565922.69 E 0.226 -0.56
1394.23 0.140 354.050 1321.55 1394.15 2.898 5.46 E 5999999.42 N 565922.81 E 0.192 -0.26 -"
1490.54 0.300 47.060 1417.86 1490.46 2.608 5.64 E 5999999.71 N 565922.98 E 0.252 0.08
1585.71 0.220 110.370 1513.02 1585.62 2.508 5.99 E 5999999.82 N 565923.33 E 0.296 0.33
1681.19 0.180 41.370 1608.50 1 681 . 1 0 2.45 8 6.26 E 5999999.87 N 565923.60 E 0.240 0.49
1776.70 0.220 332.830 1704.01 1776.61 2.178 6.28 E 6000000.14 N 565923.62 E 0.238 0.74
1872.22 0.270 245.340 1799.53 1872.13 2.108 5.99 E 6000000.21 N 565923.33 E 0.357 0.68
1968.42 0.520 241.040 1895.73 1968.33 2.418 5.40 E 5999999.90 N 565922.74 E 0.262 0.15
2062.53 0.440 260.850 1989.84 2062.44 2.678 4.67 E 5999999.63 N 565922.01 E 0.194 -0.40
2159.10 0.590 254.270 2086.40 2159.00 2.878 3.83 E 5999999.43 N 565921.17 E 0.167 -0.94
2183.42 0.670 248.360 2110.72 2183.32 2.958 3.57 E 5999999.34 N 565920.92 E 0.423 -1.13
2284.93 0.670 223.100 2212.23 2284.83 3.61 8 2.62 E 5999998.68 N 565919.97 E 0.289 -2.13
2380.59 0.140 146.820 2307.88 2380.48 4.11 8 2.30 E 5999998.17 N 565919.65 E 0.681 -2.72
2476.17 3.240 58.090 2403.41 2476.01 2.788 4.65 E 5999999.52 N 565922.00 E 3.390 -0.51
2572.63 6.750 56.840 2499.49 2572.09 1.76 N 11.72 E 6000004.12 N 565929.02 E 3.640 6.63
2668.57 13.230 60.160 2593.93 2666.53 10.32 N 25.97 E 6000012.81 N 565943.20 E 6.778 20.49
2765.21 21.020 61.630 2686.21 2758.81 24.08 N 50.86 E 6000026.78 N 565967.96 E 8.073 43.63
2859.48 23.800 62.160 2773.35 2845.95 41.00 N 82.56 E 6000043.98 N 565999.51 E 2.957 72.55
2954.96 27.390 61.770 2859.45 2932.05 60.39 N 118.96 E 6000063.70 N 566035.74 E 3.764 105.72
3050.70 33.450 59.150 2941.98 3014.58 84.36 N 161.05 E 6000088.04 N 566077.62 E 6.478 145.48 --
3146.18 39.030 55.540 3018.96 3091.56 114.89 N 208.48 E 6000118.99 N 566124.77 E 6.255 193.45
3242.69 44.030 54.530 3091.19 3163.79 151.57 N 260.88 E 6000156.13 N 566176.85 E 5.227 249.12
3335.85 50.010 50.490 3154.69 3227.29 193.11 N 314.84 E 6000198.14 N 566230.44 E 7.158 309.84
3431.74 51 .000 50.840 3215.67 3288.27 240.01 N 372.07 E 6000245.54 N 566287.26 E 1.070 376.81
3529.51 51.750 51.490 3276.70 3349.30 287.91 N 431.57 E 6000293.96 N 566346.33 E 0.926 445.66
3625.06 54.210 51.110 3334.23 3406.83 335.60 N 491.10 E 6000342.19 N 566405.44 E 2.594 514.34
3721 .45 58.400 50.100 3387.69 3460.29 386.50 N 553.05 E 6000393.63 N 566466.94 E 4.433 586.95
3817.73 60.960 50.660 3436.29 3508.89 439.49 N 617.07 E 6000447.18 N 566530.49 E 2.706 662.34
3913.52 61.170 50.200 3482.64 3555.24 492.90 N 681.69 E 6000501.15 N 566594.63 E 0.474 738.36
4009.51 61.410 49.450 3528.75 3601.35 547.21 N 746.02 E 6000556.03 N 566658.48 E 0.729 815.07
4105.18 63.650 48.530 3572.88 3645.48 602.91 N 810.06 E 6000612.30 N 566722.03 E 2.492 892.92
15 April, 2003 - 11:10 Page2of6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1
Your Ref: API 500292313970
Job No. AKZZ2309935, Surveyed: 5 March, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft)
4201.63 63.860 48.840 3615.53 3688.13 660.02 N 875.03 E 6000669.98 N 566786.50 E 0.361 972.44
4298.98 63.250 50.600 3658.89 3731.49 716.37 N 941.52 E 6000726.92 N 566852.49 E 1.736 1051.93
4394.17 62.110 52.160 3702.58 3775.18 769.16N 1007.59 E 6000780.28 N 566918.09 E 1.885 1128.01
4490.28 62.370 53.030 3747.34 3819.94 820.82 N 1075.15 E 6000832.54 N 566985.19 E 0.845 1203.73
4585.60 63.300 52.980 3790.86 3863.46 871 .85 N 1142.88 E 6000884.17 N 567052.47 E 0.977 1278.95
_/ !
4682.82 62.470 52.690 3835.17 3907.77 924.13 N 1211.84 E 6000937.05 N 567120.96 E 0.894 1355.82
4778.64 64.750 49.900 3877.76 3950.36 977.81 N 1278.80 E 6000991.32 N 567187.44 E 3.530 1433.09
4874.35 64.810 49.550 3918.55 3991.15 1033.78 N 1344.86 E 6001047.87 N 567253.01 E 0.337 1512.05
4970.28 67.180 48.720 3957.57 4030.17 1091.12 N 1411.13 E 6001105.79 N 567318.76 E 2.594 1592.33
5067.28 71.010 45.860 3992.18 4064.78 1152.58 N 1477.67 E 6001167.84 N 567384.76 E 4.814 1676.46
5161.36 77.810 42.930 4017.46 4090.06 1217.31 N 1540.99 E 6001233.13 N 567447.51 E 7.825 1762.14
5257.98 77.810 37.990 4037.87 4110.47 1289.15 N 1602.26 E 6001305.50 N 567508.14 E 4.997 1853.35
5354.57 78.820 31.540 4057.45 4130.05 1366.81 N 1656.15 E 6001383.63 N 567561.34 E 6.622 1946.65
5450.76 80.010 26.250 4075.13 4147.73 1449.56 N 1701.82 E 6001466.79 N 567606.28 E 5.546 2041.01
5546.34 80.890 21.330 4091.00 4163.60 1535.78 N 1739.82 E 6001553.34 N 567643.52 E 5.159 2135.19
5643.38 79.330 15.840 4107.68 4180.28 1626.35 N 1770.28 E 6001644.17 N 567673.18 E 5.800 2230.05
5725.09 79.260 10.480 4122.87 4195.47 1704.50 N 1788.56 E 6001722.48 N 567690.76 E 6.446 2308.45
5825.61 82.570 9.630 4138.74 4211.34 1802.22 N 1805.88 E 6001820.35 N 567707.22 E 3.397 2404.11
5875.34 91.230 5.170 4141.43 4214.03 1851.41 N 1812.26 E 6001869.59 N 567713.17 E 19.578 2451.25
5926.87 90.680 357.880 4140.57 4213.17 1902.88 N 1813.63 E 6001921.07 N 567714.09 E 14.185 2498.30
5970.87 90.430 353.100 4140.14 4212.74 1946.73 N 1810.17E 6001964.89 N 567710.24 E 10.878 2536.39
6019.31 89.320 350.060 4140.24 4212.84 1994.64 N 1803.08 E 6002012.73 N 567702.73 E 6.681 2576.58
6068.58 89.320 349.880 4140.83 4213.43 2043.15 N 1794.50 E 6002061.17 N 567693.72 E 0.365 2616.67 _/
6117.86 89.010 350.110 4141.55 4214.15 2091.68 N 1785.94 E 6002109.62 N 567684.73 E 0.783 2656.78
6164.08 89.630 346.310 4142.10 4214.70 2136.91 N 1776.50 E 6002154.77 N 567674.89 E 8.330 2693.55
6218.56 89.690 346.370 4142.42 4215.02 2189.85 N 1763.63 E 6002207.59 N 567661.56 E 0.156 2735.79
6261.19 89.750 345.840 4142.63 4215.23 2231.23 N 1753.39 E 6002248.88 N 567650.95 E 1.251 2768.73
6310.64 89.440 345.870 4142.98 4215.58 2279.18 N 1741.31 E 6002296.72 N 567638.45 E 0.630 2806.81
6355.16 89.320 345.000 4143.46 4216.06 2322.27 N 1730.12 E 6002339.70 N 567626.87 E 1.973 2840.88
6404.44 89.380 344.280 4144.02 4216.62 2369.78 N 1717.06 E 6002387.10 N 567613.40 E 1 .466 2878.14
6449.01 90.620 344.370 4144.02 4216.62 2412.69 N 1705.02 E 6002429.91 N 567600.98 E 2.789 2911.69
6500.75 90.860 344.270 4143.35 4215.95 2462.50 N 1691.04 E 6002479.59 N 567586.56 E 0.503 2950.63
6545.95 91.850 344.500 4142.28 4214.88 2506.02 N 1678.88 E 6002523.00 N 567574.01 E 2.249 2984.67
6598.80 89.510 343.760 4141.65 4214.25 2556.85 N 1664.43 E 6002573.70 N 567559.12 E 4.644 3024.33
6642.48 89.630 344.710 4141.98 4214.58 2598.89 N 1652.56 E 6002615.63 N 567546.88 E 2.192 3057.16
15 April, 2003 - 11:10 Page 3 of 6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1
Your Ref: API 500292313970
Job No. AKZZ2309935, Surveyed: 5 March, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(tt) (tt) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft)
6690.52 89.510 343.630 4142.34 4214.94 2645.10 N 1639.45 E 6002661.73 N 567533.37 E 2.262 3093.23
6739.01 89.070 343.160 4142.94 4215.54 2691.57 N 1625.60 E 6002708.07 N 567519.10 E 1.328 3129.21
6787.71 89.320 344.140 4143.63 4216.23 2738.29 N 1611.89 E 6002754.67 N 567504.98 E 2.077 3165.48
6835.24 87.280 344.560 4145.04 4217.64 2784.04 N 1599.08 E 6002800.30 N 567491.76 E 4.382 3201.25
6886.21 85.990 343.990 4148.03 4220.63 2833.01 N 1585.29 E 6002849.15 N 567477.54 E 2.766 3239.52
6931.04 84.930 346.890 4151.58 4224.18 2876.26 N 1574.05 E 6002892.30 N 567465.93 E 6.868 3273.72 ~
6979.66 85.050 349.440 4155.82 4228.42 2923.66 N 1564.12 E 6002939.61 N 567455.58 E 5.231 3312.23
7026.42 85.310 348.280 4159.75 4232.35 2969.38 N 1555.12 E 6002985.25 N 567446.17 E 2.534 3349.61
7079.00 84.930 348.650 4164.23 4236.83 3020.71 N 1544.64 E 6003036.48 N 567435.24 E 1.007 3391.43
7122.48 89.510 351 .430 4166.34 4238.94 3063.47 N 1537.13 E 6003079.18 N 567427.36 E 12.317 3426.80
7170.96 89.140 350.620 4166.91 4239.51 3111.35N 1529.57 E 6003126.99 N 567419.37 E 1.837 3466.76
7218.60 91.670 354.020 4166.57 4239.17 3158.55N 1523.21 E 6003174.13 N 567412.59 E 8.895 3506.62
7269.39 91.300 354.580 4165.25 4237.85 3209.07 N 1518.16E 6003224.61 N 567407.10 E 1.321 3550.05
7313.37 91.540 359.300 4164.16 4236.76 3252.96 N 1515.82 E 6003268.48 N 567404.37 E 10.743 3588.65
7366.11 89.570 0.420 4163.65 4236.25 3305.70 N 1515.69 E 6003321.21 N 567403.77 E 4.297 3636.20
7411 .48 88.460 3.220 4164.43 4237.03 3351.03 N 1517.13E 6003366.55 N 567404.81 E 6.638 3677.74
7462.06 87.220 5.450 4166.34 4238.94 3401.43 N 1520.95 E 6003416.98 N 567408.19 E 5.042 3724.87
7508.52 88.520 9.680 4168.07 4240.67 3447.44 N 1527.06 E 6003463.04 N 567413.89 E 9.519 3769.03
7557.08 87.340 12.350 4169.82 4242.42 3495.07 N 1536.33 E 6003510.75 N 567422.74 E 6.008 3816.01
7604.40 86.290 18.770 4172.45 4245.05 3540.56 N 1549.00 E 6003556.36 N 567435.01 E 13.727 3862.52
7651.38 88.830 24.400 4174.45 4247.05 3584.19 N 1566.26 E 6003600.13 N 567451.88 E 13.136 3909.32
7698.40 88.770 28.730 4175.44 4248.04 3626.22 N 1587.28 E 6003642.35 N 567472.53 E 9.208 3956.32
7747.58 88.700 28.310 4176.52 4249.12 3669.42 N 1610.75 E 6003685.76 N 567495.62 E 0.866 4005.41
7795.90 87.41 0 28.300 4178.16 4250.76 3711.94 N 1633.65 E 6003728.47 N 567518.15 E 2.670 4053.65 ~
7844.90 87.280 28.200 4180.43 4253.03 3755.06 N 1656.82 E 6003771.79 N 567540.93 E 0.335 4102.54
7891.97 87.530 27.970 4182.57 4255.17 3796.54 N 1678.95 E 6003813.47 N 567562.70 E 0.721 4149.51
7938.73 87.400 26.830 4184.63 4257.23 3838.02 N 1700.45 E 6003855.13 N 567583.83 E 2.451 4196.20
7987.89 86.790 26.210 4187.13 4259.73 3881.95 N 1722.37 E 6003899.26 N 567605.37 E 1.768 4245.29
8034.07 86.970 25.820 4189.64 4262.24 3923.39 N 1742.60 E 6003940.87 N 567625.22 E 0.929 4291.40
8083.85 86.970 25.890 4192.27 4264.87 3968.12 N 1764.28 E 6003985.80 N 567646.51 E 0.140 4341.11
8132.19 87.220 25.250 4194.72 4267.32 4011.67 N 1785.11 E 6004029.53 N 567666.96 E 1 .420 4389.39
8177.98 86.230 25.150 4197.34 4269.94 4053.03 N 1804.58 E 6004071.06 N 567686.06 E 2.173 4435.10
8227.37 90.800 26.550 4198.62 4271.22 4097.45 N 1826.10 E 6004115.67 N 567707.19 E 9.677 4484.46
8274.54 95.250 28.280 4196.13 4268.73 4139.26 N 1847.78 E 6004157.66 N 567728.50 E 10.120 4531.52
8324.28 94.820 28.370 4191.76 4264.36 4182.87 N 1871.29 E 6004201.48 N 567751.62 E 0.883 4581.01
15 April, 2003 - 11:10 Page 4 of6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1
Your Ref: AP/500292313970
Job No. AKZZ2309935, Surveyed: 5 March, 2003
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 o Oft)
8370.20 96.680 29.820 4187.16 4259.76 4222.79 N 1893.51 E 6004241.60 N 567773.48 E 5.126 4626.61
8419.14 97.000 29.410 4181.33 4253.93 4265.04 N 1917.52 E 6004284.05 N 567797.12 E 1.058 4675.07
8467.62 96.180 28.590 4175.77 4248.37 4307.16 N 1940.87 E 6004326.38 N 567820.10 E 2.384 4723.14
8518.29 95.680 28.220 4170.53 4243.13 4351.49 N 1964.84 E 6004370.92 N 567843.68 E 1.225 4773.48
8563.31 95.190 29.050 4166.27 4238.87 4390.82 N 1986.32 E 6004410.44 N 567864.81 E 2.134 4818.23
8613.60 94.510 28.070 4162.02 4234.62 4434.84 N 2010.27 E 6004454.67 N 567888.37 E 2.366 4868.26 ----"
8657.97 94.450 28.720 4158.55 4231 .15 4473.75 N 2031.31 E 6004493.76 N 567909.07 E 1 .467 4912.44
8727.00 94.450 28.720 4153.20 4225.80 4534.10 N 2064.38 E 6004554.41 N 567941.60 E 0.000 4981.15 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 25.500° (True).
Magnetic Declination at Surface is 25.582°(26-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 8727.00ft.,
The Bottom Hole Displacement is 4981.94ft., in the Direction of 24.480° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
~
Comment
8727.00
4225.80
4534.10 N
2064.38 E Projected Survey
15 April, 2003 - 11:10
Page 5 of 6
DrillQuest 3.03.02.005
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1
Your Ref: API 500292313970
Job No. AKZZ2309935, Surveyed: 5 March, 2003
BPXA
Survey tool program for MPS-12PB1
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
882.00
0.00
881.94
15 April, 2003 - 11:10
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
882.00
8727.00
881.94 Tolerable Gyro (MPS-12PB 1 Gyro)
4225.80 AK-6 BP _IFR-AK (MPS-12PB1)
~
--
..----
Page 60f6
DrillQuest 3.03.02.005
')
"]
a08-LBS
16-Apr-03
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-12 PB1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
8,727.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RàEC~E,\'Jl=()
APR 2 Z 2.003
PJa5Ka Œi eJ. Gas Cons. Commìss1on
,Anchorage
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-12PB1 MWD
~/
Job No. AKMW2309935, Surveyed: 5 February, 2003
Survey Report
15 April, 2003
Your Ref: API 500292313970
Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027' 47.7008" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
~
Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid)
Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True)
Kelly Bushing: 72. 60ft above Mean Sea Level
Elevation relative to Project V Reference: 72.60ft
Elevation relative to Structure: 72.60ft
5~ ''''''Y-SUl!
I:JRJL..-L.:l"'~ "s¡. t:;'i=tyit;'í:!:s
A Halliburton Company
Survey Ref: svy1150
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1 MWD
Your Ref: API 500292313970
Job No. AKMW2309935, Surveyed: 5 February, 2003
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
882.00 1.250 47.000 809.34 881 .94 5.838 2.15 E 5999996.45 N 565919.52 E -4.33 MWD Magnetic
1009.08 0.440 43.110 936.41 1009.01 4.53 8 3.50 E 5999997.77 N 565920.86 E 0.639 -2.58
1105.25 0.570 63.720 1032.57 1105.17 4.048 4.18 E 5999998.25 N 565921.54 E 0.230 -1.85
1202.63 0.460 49.520 1129.95 1202.55 3.588 4.91 E 5999998.73 N 565922.26 E 0.172 -1.11
1298.35 0.250 40.460 1225.67 1298.27 3.178 5.34 E 5999999.14 N 565922.69 E 0.226 -0.56
1394.23 0.140 354.050 1321.55 1394.15 2.898 5.46 E 5999999.42 N 565922.81 E 0.192 -0.26 .---
1490.54 0.300 47.060 1417.86 1490.46 2.608 5.64 E 5999999.71 N 565922.98 E 0.252 0.08
1585.71 0.220 110.370 1513.02 1585.62 2.508 5.99 E 5999999.82 N 565923.33 E 0.296 0.33
1681.19 0.180 41 .370 1608.50 1681.10 2.45 8 6.26 E 5999999.87 N 565923.60 E 0.240 0.49
1776.70 0.220 332.830 1704.01 1776.61 2.178 6.28 E 6000000.14 N 565923.62 E 0.238 0.74
1872.22 0.270 245.340 1799.53 1872.13 2.108 5.99 E 6000000.21 N 565923.33 E 0.357 0.68
1968.42 0.520 241.040 1895.73 1968.33 2.418 5.40 E 5999999.90 N 565922.74 E 0.262 0.15
2062.53 0.440 260.850 1989.84 2062.44 2.678 4.67 E 5999999.63 N 565922.01 E 0.194 -0.40
2159.10 0.590 254.270 2086.40 2159.00 2.878 3.83 E 5999999.43 N 565921.17 E 0.167 -0.94
2183.42 0.670 248.360 2110.72 2183.32 2.958 3.57 E 5999999.34 N 565920.92 E 0.423 -1.13
2284.93 0.670 222.800 2212.23 2284.83 3.61 8 2.62 E 5999998.68 N 565919.97 E 0.292 -2.13
2380.59 0.140 147.200 2307.88 2380.48 4.128 2.30 E 5999998.16 N 565919.66 E 0.679 -2.72
2476.17 3.240 58.670 2403.41 2476.01 2.81 8 4.67 E 5999999.49 N 565922.02 E 3.389 -0.52
2572.63 6.750 57.210 2499.49 2572.09 1.68 N 11 .77 E 6000004.04 N 565929.07 E 3.641 6.58
2668.57 13.230 60.530 2593.93 2666.53 10.14 N 26.08 E 6000012.63 N 565943.31 E 6.778 20.38
2765.21 21.020 62.140 2686.21 2758.81 23.70 N 51.07 E 6000026.41 N 565968.18 E 8.075 43.38
2859.48 23.800 62.520 2773.35 2845.95 40.38 N 82.90 E 6000043.37 N 565999.86 E 2.953 72.14
2954.96 27.390 62.200 2859.45 2932.05 59.52 N 119.43 E 6000062.84 N 566036.22 E 3.763 105.14
3050.70 33.450 59.71 0 2941.98 3014.58 83.13 N 161.74E 6000086.81 N 566078.32 E 6.464 144.66 .~
3146.18 39.030 56.230 3018.96 3091.56 113.14N 209.49 E 6000117.24 N 566125.81 E 6.227 192.30
3242.69 44.030 55.020 3091.19 3163.79 149.28 N 262.27 E 6000153.85 N 566178.26 E 5.247 247.65
3335.85 50.010 51.030 3154.68 3227.28 190.33 N 316.60 E 6000195.38 N 566232.23 E 7.141 308.09
3431.74 51. 000 51.250 3215.67 3288.27 236.76 N 374.22 E 6000242.31 N 566289.44 E 1.048 374.80
3529.51 51.750 51.890 3276.70 3349.30 284.23 N 434.06 E 6000290.31 N 566348.85 E 0.922 443.41
3625.06 54.210 51.500 3334.23 3406.83 331.52 N 493.92 E 6000338.12 N 566408.29 E 2.595 511.86
3721.45 58.400 50.290 3387.69 3460.29 382.10 N 556.12 E 6000389.26 N 566470.04 E 4.471 584.30
3817.73 60.960 50.980 3436.29 3508.89 434.81 N 620.37 E 6000442.53 N 566533.83 E 2.730 659.53
3913.52 61.170 50.550 3482.64 3555.24 487.83 N 685.30 E 6000496.12 N 566598.29 E 0.450 735.34
4009.51 61.410 49.840 3528.75 3601.35 541.73 N 749.98 E 6000550.58 N 566662.49 E 0.695 811.83
4105.18 63.650 48.900 3572.88 3645.48 597.00 N 814.39 E 6000606.43 N 566726.41 E 2.498 889.45
15 April, 2003 - 11 :11 Page2of6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1 MWD
Your Ref: API 500292313970
Job No. AKMW2309935, Surveyed: 5 February, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) e/100ft)
4201.63 63.860 49.230 3615.53 3688.13 653.68 N 879.74 E 6000663.68 N 566791.26 E 0.376 968.74
4298.98 63.250 51.110 3658.89 3731 .49 709.51 N 946.67 E 6000720.10 N 566857.69 E 1.839 1047.95
4394.17 62.110 53.110 3702.58 3775.18 761.45 N 1013.41 E 6000772.62 N 566923.97 E 2.218 1123.56
4490.28 62.370 52.790 3747.34 3819.94 812.69 N 1081.28 E 6000824.46 N 566991.39 E 0.400 1199.03
4585.60 63.300 53.360 3790.86 3863.46 863.64 N 1149.08 E 6000876.01 N 567058.73 E 1.111 1274.20
4682.82 62.470 53.090 3835.17 3907.77 915.44 N 1218.39 E 6000928.42 N 567127.59 E 0.889 1350.80 - /
4778.64 64.750 50.290 3877.76 3950.36 968.66 N 1285.72 E 6000982.23 N 567194.44 E 3.537 1427.81
4874.35 64.810 49.950 3918.55 3991.15 1024.18 N 1352.16 E 6001038.33 N 567260.39 E 0.327 1506.53
4970.28 67.180 48.940 3957.57 4030.17 1081.16 N 1418.73 E 6001095.89 N 567326.46 E 2.651 1586.62
5067.28 71.010 45.790 3992.18 4064.78 1142.53 N 1485.35 E 6001157.86 N 567392.53 E 4.979 1670.70
5161.36 77.810 42.880 4017.46 4090.06 1207.33 N 1548.61 E 6001223.21 N 567455.21 E 7.817 1756.41
5257.98 77.810 38.210 4037.87 4110.47 1279.07 N 1609.98 E 6001295.49 N 567515.95 E 4.724 1847.59
5354.57 78.820 31.730 4057.45 4130.05 1356.55 N 1664.16 E 6001373.44 N 567569.44 E 6.652 1940.84
5450.76 80.010 26.690 4075.13 4147.73 1439.05 N 1710.28 E 6001456.35 N 567614.83 E 5.297 2035.16
5546.34 80.890 21.590 4091.00 4163.60 1525.03 N 1748.80 E 6001542.67 N 567652.60 E 5.342 2129.35
5643.38 79.330 16.130 4107.68 4180.28 1615.46 N 1779.70 E 6001633.36 N 567682.70 E 5.771 2224.27
5725.09 79.260 10.840 4122.87 4195.47 1693.50 N 1798.42 E 6001711.57 N 567700.72 E 6.362 2302.77
5825.61 82.570 10.050 4138.74 4211.34 1791.10 N 1816.41 E 6001809.32 N 567717.85 E 3.383 2398.61
5875.34 91.230 5.320 4141 .43 4214.03 1840.25 N 1823.03 E 6001858.53 N 567724.04 E 19.831 2445.82
5926.87 90.680 358.030 4140.57 4213.17 1891.72 N 1824.54 E 6001910.01 N 567725.09 E 14.185 2492.92
5970.87 90.430 353.090 4140.14 4212.74 1935.57 N 1821.13 E 6001953.83 N 567721.30 E 11.241 2531.04
6019.31 89.320 349.560 4140.25 4212.85 1983.45 N 1813.83 E 6002001.64 N 567713.57 E 7.639 2571.10
6068.58 89.320 349.710 4140.83 4213.43 2031.91 N 1804.96 E 6002050.02 N 567704.28 E 0.304 2611.03
6117.86 89.010 350.200 4141.55 4214.15 2080.43 N 1796.37 E 6002098.46 N 567695.26 E 1.177 2651.12 ~
6164.08 89.630 345.910 4142.10 4214.70 2125.63 N 1786.81 E 6002143.58 N 567685.30 E 9.377 2687.81
6218.56 89.690 346.110 4142.42 4215.02 2178.50 N 1773.64 E 6002196.33 N 567671.66 E 0.383 2729.85
6261.19 89.750 345.720 4142.63 4215.23 2219.85 N 1763.26 E 6002237.58 N 567660.92 E 0.926 2762.70
6310.64 89.440 345.520 4142.98 4215.58 2267.75 N 1750.98 E 6002285.37 N 567648.22 E 0.746 2800.65
6355.16 89.320 344.720 4143.46 4216.06 2310.77 N 1739.55 E 6002328.29 N 567636.41 E 1.817 2834.56
6404.44 89.380 343.850 4144.02 4216.62 2358.20 N 1726.20 E 6002375.61 N 567622.64 E 1.770 2871.63
6449.01 90.620 343.940 4144.02 4216.62 2401.02 N 1713.84 E 6002418.32 N 567609.90 E 2.789 2904.96
6500.75 90.860 344.250 4143.35 4215.95 2450.78 N 1699.66 E 6002467.94 N 567595.28 E 0.758 2943.76
6545.95 91.850 344.700 4142.28 4214.88 2494.32 N 1687.57 E 6002511 .37 N 567582.81 E 2.406 2977.85
6598.80 89.510 343.990 4141 .65 4214.25 2545.20 N 1673.31 E 6002562.13 N 567568.10 E 4.627 3017.64
6642.48 89.630 345.110 4141.98 4214.58 2587.30 N 1661.67 E 6002604.12 N 567556.09 E 2.579 3050.63
15 April, 2003 - 11: 11 Page 30f6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1 MWD
Your Ref: API 500292313970
Job No. AKMW2309935, Surveyed: 5 February, 2003
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/1 OOft)
6690.52 89.510 343.720 4142.34 4214.94 2633.57 N 1648.77 E 6002650.28 N 567542.78 E 2.904 3086.83
6739.01 89.070 343.660 4142.94 4215.54 2680.10 N 1635.15 E 6002696.69 N 567528.75 E 0.916 3122.97
6787.71 89.320 344.820 4143.63 4216.23 2726.97 N 1621.92 E 6002743.44 N 567515.11 E 2.436 3159.58
6835.24 87.280 345.240 4145.04 4217.64 2772.86 N 1609.65 E 6002789.22 N 567502.44 E 4.382 3195.72
6886.21 85.990 344.880 4148.03 4220.63 2822.02 N 1596.53 E 6002838.26 N 567488.89 E 2.627 3234.44
6931.04 84.930 347.470 4151.58 4224.18 2865.41 N 1585.86 E 6002881.56 N 567477.82 E 6.226 3269.01 ~
6979.66 85.050 350.040 4155.83 4228.43 2912.91 N 1576.41 E 6002928.97 N 567467.96 E 5.271 3307.82
7026.42 85.310 349.920 4159.75 4232.35 2958.80 N 1568.30 E 6002974.78 N 567459.45 E 0.612 3345.74
7079.00 84.930 350.420 4164.23 4236.83 3010.42 N 1559.36 E 6003026.32 N 567450.05 E 1.192 3388.48
7122.48 89.510 352.970 4166.34 4238.94 3053.38 N 1553.09 E 6003069.22 N 567443.40 E 12.052 3424.56
7170.96 89.140 351 .170 4166.91 4239.51 3101.39 N 1546.40 E 6003117.17 N 567436.29 E 3.790 3465.01
7218.60 91.670 354.330 4166.57 4239.17 3148.64 N 1540.39 E 6003164.37 N 567429.86 E 8.497 3505.07
7269.39 91.300 355.130 4165.25 4237.85 3199.19 N 1535.73 E 6003214.88 N 567424.75 E 1.735 3548.69
7313.37 91.540 1.380 4164.16 4236.76 3243.12 N 1534.39 E 6003258.79 N 567423.03 E 14.217 3587.76
7366.11 89.570 2.700 4163.65 4236.25 3295.82 N 1536.27 E 6003311.51 N 567424.44 E 4.496 3636.14
7411 .48 88.460 4.110 4164.43 4237.03 3341 .1 0 N 1538.96 E 6003356.81 N 567426.73 E 3.955 3678.17
7462.06 87.220 6.430 4166.34 4238.94 3391.43 N 1543.60 E 6003407.18 N 567430.93 E 5.198 3725.59
7508.52 88.520 10.480 4168.07 4240.67 3437.34 N 1550.43 E 6003453.15 N 567437.35 E 9.149 3769.97
7557.08 87.340 12.780 4169.82 4242.42 3484.87 N 1560.21 E 6003500.76 N 567446.71 E 5.321 3817.08
7604.40 86.290 19.170 4172.45 4245.05 3530.26 N 1573.21 E 6003546.27 N 567459.31 E 13.664 3863.65
7651.38 88.830 24.500 4174.45 4247.05 3573.81 N 1590.66 E 6003589.97 N 567476.37 E 12.558 3910.47
7698.40 88.770 28. 680 4175.44 4248.04 3615.84 N 1611.69 E 6003632.19 N 567497.04 E 8.889 3957.46
7747.58 88.700 28.570 4176.52 4249.12 3659.00 N 1635.25 E 6003675.55 N 567520.21 E 0.265 4006.55
7795.90 87.41 0 28.450 4178.16 4250.76 3701 .44 N 1658.30 E 6003718.19 N 567542.89 E 2.681 4054.78 .---
7844.90 87.280 28.230 4180.43 4253.03 3744.52 N 1681.54 E 6003761.47 N 567565.74 E 0.521 4103.67
7891.97 87.530 27.900 4182.57 4255.17 3786.01 N 1703.66 E 6003803.16 N 567587.50 E 0.879 4150.64
7938.73 87.400 26.480 4184.63 4257.23 3827.56 N 1725.00 E 6003844.90 N 567608.47 E 3.047 4197.33
7987.89 86.790 26.390 4187.13 4259.73 3871.52 N 1746.86 E 6003889.05 N 567629.94 E 1.254 4246.42
8034.07 86.970 25.600 4189.64 4262.24 3912.97 N 1767.07 E 6003930.67 N 567649.79 E 1.752 4292.53
8083.85 86.970 26.080 4192.27 4264.87 3957.71 N 1788.74 E 6003975.60 N 567671.06 E 0.963 4342.24
8132.19 87.220 25.050 4194.72 4267.32 4001.26 N 1809.57 E 6004019.34 N 567691.51 E 2.190 4390.52
8177.98 86.230 25.480 4197.34 4269.94 4042.60 N 1829.08 E 6004060.85 N 567710.65 E 2.357 4436.23
8227.37 90.800 26.640 4198.62 4271.22 4086.94 N 1850.77 E 6004105.38 N 567731.94 E 9.546 4485.59
8274.54 95.250 28.870 4196.13 4268.73 4128.62 N 1872.69 E 6004147.24 N 567753.50 E 10.549 4532.64
8324.28 94.820 29.140 4191.76 4264.36 4171.95 N 1896.72 E 6004190.79 N 567777.14 E 1.020 4582.10
15 April, 2003 - 11:11 Page 4 of 6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1 MWD
Your Ref: API 500292313970
Job No. AKMW2309935, Surveyed: 5 February, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) C/100ft)
8370.20 96.680 29.920 4187.16 4259.76 4211.70 N 1919.24 E 6004230.74 N 567799.31 E 4.389 4627.67
8419.14 97.000 29.700 4181.33 4253.93 4253.86 N 1943.39 E 6004273.11 N 567823.09 E 0.792 4676.13
8467.62 96.180 29.220 4175.77 4248.37 4295.80 N 1967.08 E 6004315.25 N 567846.41 E 1.957 4724.17
8518.29 95.680 28.930 4170.53 4243.13 4339.84 N 1991.57 E 6004359.51 N 567870.51 E 1.139 4774.47
8563.31 95.190 29.830 4166.27 4238.87 4378.90 N 2013.56 E 6004398.76 N 567892.15 E 2.268 4819.19
8613.60 94.510 28.300 4162.02 4234.62 4422.69 N 2037.90 E 6004442.77 N 567916.11 E 3.319 4869.20 --"
8657.97 94.450 28.990 4158.55 4231 .15 4461.51 N 2059.10 E 6004481 .77 N 567936.97 E 1.556 4913.36
8727.00 94.450 28.990 4153.20 4225.80 4521.71 N 2092.46 E 6004542.26 N 567969.79 E 0.000 4982.06 Projected Suvey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 25.500° (True).
Magnetic Declination at Surface is 25.582°(26-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 8727.00ft.,
The Bottom Hole Displacement is 4982.40ft., in the Direction of 24.833° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
-'
Comment
8727.00
4225.80
4521.71 N
2092.46 E Projected Suvey
15 April, 2003 - 11:11
Page 5 of 6
DrillQuest 3.03.02.005
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12PB1 MWD
Your Ref: API 500292313970
Job No. AKMW2309935, Surveyed: 5 February, 2003
BPXA
Survey tool program for MPS-12PB1 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
0.00
882.00
0.00
881.94
15 April, 2003 - 11:11
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
882.00
8727.00
881.94 Tolerable Gyro (MPS-12PB1 Gyro)
422~.80 MWD Magnetic (MPS-12PB1 MWD)
.----
.~
Page 6 of 6
DrillQuest 3.03.02.005
')
~:!Æ1æ :} !Æ~!Æ~~~!Æ
)
AIfJl~1iA. OIL AND GAS
CONSERVATION COMMISSION
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P. O. Box 196612
Anchorage, Alaska 99519-6612
FRANK H. MURKOWSKI, GOVERNOR
333 W. -pH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Milne Point Unit S-12
BP Exploration (Alaska) Inc.
Pennit No: 203-023
Surface Location: 3334' NSL, 93' WEL, SEC. 12, TI2N, RI0E, UM
Bottomhole Location: 2528' NSL, 2041' EWL, SEC. 06, TI2N, RIlE, UM
Dear Mr. Archey:
Enclosed is the approved application for pennit to drill the above referenced development well.
This pennit to drill does not exempt you from obtaining additional pennits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required pennits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the pennit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative· Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the tenns and conditions of this pennit may
result in the revocation or suspension of the pennit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~~
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this ¿~day of February" 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
~JCí It 2-/4/ () 5
12. Distance to nearest property line 13. Distance to nearest well
ADL 380109, 20411 MD No Close Approach
16. To be completed for deviat~d wells
Kick Off Depth 2250' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casina Weight Grade CouDling
20" 92# H-40 Weld
13-1/2" 10-3/4" 45.5# L-80 BTC
9-7/8" 7-5/8" 29.7# L-80 BTC
6-1/8" 4-1/211 12.7# L-80 BTC
Hole
42"
-) STATE OF ALASKA ')
ALASKh ùlL AND GAS CONSERVATION COMIVIISSION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
o Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Plan KBE = 62.1' Milne Point Unit I Schrader
6. Property Designation Bluff /'
ADL 380110
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPS·12 /'
9. Approximate spud date
03/04/03 Amount $200,000.00
/ 14. Number of acres in property 15. Pro~sed depth (MD and TVD)
2560 8600' MD / 4226' TVD
17. Anticipated press4re {see 20 AAC 25.035 (e) (2)}
96 0 Maximum surface'/'¡ 403 psig, At total depth (TVD) 4204' 11824 psig
Setting Depth
TOD Bottom
MD TVD MD TVD
Surface Surface 112' 112'
Surface Surface 2250' 22501
Surface Surface 55361 42021
53861 41201 86001 4226'
Multilateral
1 a. Type of work II Drill 0 Redrill
ORe-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface x = 565917, Y = 6000002
3334' NSL, 93' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval x = 567541, Y = 6001376
4692' NSL, 1542' EWL, SEC. 07, T12N, R11E, UM
At total depth x = 568012, Y = 6004495
2528' NSL, 2041' EWL, SEC. 06, T12N, R11E,UM
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
Lenath
1121
22501
55361
32141
Quantitv of Cement
(include stage data)
260 sx Arctic Set (Approx.)
536 sx Class IL', 220 sx Class 'G' .",
60 sx Class IL', 308 sx Class 'G' ,.,..
Uncemented Slotted Liner ".
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing
Structural
Conductor
Su rface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
~~ i'"^' r~ ~.. ¡;
~".(I' ,tu:1 11""" ',:1,
,~j '~\" t. I~,,"j ~. ~
Perforation depth: measured
true vertical
C' ¡......1 " {y, ;,~
y:.,ç¡O;1\d \.1.1..[
20. Attachments
II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report II 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By Name/Number: Terrie Hubble, 564-4628
21. Is~:~::Y ~a~::::ttr~(!;h1COITectt~:::::::=~Engineer Date //30/03
Permit Number API Number A,~rov~IÆate See cover letter
203 - 02-3 50- C5 z- 9 - 2- 3 / .J 9' ~ U ~ f) for other requirements
Conditions of Approval: Samples Required 0 Yes J8I No Mud Log equired 0 Yes .Œ1 No
Hydrogen Sulfide Measures 0 Yes E1 No Directional Survey Required BI Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: T.(-õt,~kLS,cMEdBf!C-~ ¡:JÇ.;.
M L. Bill
Approved By
Form 1 0-40 1 Rev. 12-01-85
Commissioner
by order of
the commission
, f
Date I~ & ~) '3
SLbm In Triplicate
)ne Point MPS-12 Well Permit
)
IWell Name: IMPS-12
Drill and Complete Plan Summary
I Type of Well (service I producer I injector): 1 Multi Lateral Producer "OA" & "OB"
Surface Location:
Target Location:
TOP "OA"
Target Location:
BHL "OA" Well TD
Target Location:
TOP "08"
Target Location:
BHL "08" Well TD
19451 FNL, (33341 FSL), 931 FEL, (5181' FWL), SEC. 12, T12N,R10E
E=565917.32 N=6000002.26'
586' FNL, (46921 FSL), 3232' FEL, (1542~ FWL), SEC. 7, T12N, R11 E
E=567540.69 N=6001376.04 Z=4151 TVD/RKB
27511 FNL, (25281 FSL), 2721' FEL, (204,11 FWL), SEC. 6, T12N, R11 E
E=568.012.0 N=6004495.0 Z=4171' TVD
400' FNL, (48781 FSL), 3150' FEL, (16241 FWL), SEC. 7, T12N,R11 E
E=567621.0 N=6001563.0 Z=4202' TVD
27511 FNL, (25281 FSL), 2721' FEL, (20411 FWL), SEC. 6, T12N,R11 E
E=568012.00 N=6004495.0 Z=4226' TVD
~'2.~2-
I ç; '-I z..
.---
'-f11~1
-
/
I AFE Number: 1
I Estimated Start Date: 13/4/03
1 MD: 18600 I
1
/
I Ri~: 1 Doyon 14
I Operatin~ days to complete: 120.4
1 Max Inc: 196 1 I KOP: 122501 1 KBE: 162.1
I TVD: 14226 1
I Well Desi~n (conventional, slim hole, etc.): I Conventional Grass Roots ML Producer
I Objective: 1 Schrader OA & OB Sand
Mud Program:
12.25-in Surface Hole Mud Properties:
Density (ppg) Funnel visc YP HTHP
8.6 - 9.0 75 - 150 25 - 60 N/A
Spud - LSND Freshwater Mud
pH API Filtrate LG Solids
8.5 - 9.5 < 8 < 6.5
9.875-in Intermediate Hole Mud Properties:
Density (ppg). Funnel visc YP HTHP
9.0-9.3775-150 25-60 N/A
LSND Freshwater Mud
pH API Filtrate LG Solids
9.0 - 9.5 < 8 < 6.5
6.125-in Production Hole Mud Properties: KCL-CaC03 Flo-Pro
Density (ppg) Funnel visc VP HTHP pH API Filtrate LG Solids
8.6 - 9.3 40 - 55 22 - 27 <10 8.0 - 8.5 4 - 6 < 12
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be
ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R.
)
,. )e Point MPS-12 Well Permit
Cement Program:
Casin~ Size 110-3/4" 45.5-lb/ft L-80 BTC Surface Casing
Basis 250% excess over gauge hole in permafrost interval
40°fc¡ excess over gauge hole below permafrost
Total Cement
Volume: 453-bbl Wash 50-bbl water
Spacer ~bl Viscosified Spacer (Alpha) weighted to 10.5-lb/gal
Lead ~-sx 10.7 Iblgal Class L - 4.15 cuft/sx (cement to
Tail ~~:~5.8Ib/gal Prem G -1.15 cufVsx (top of tail at
-. ...,-~-~,. . --- ,,- -_. -,,- -
BHST ~ 80°F from SOR, BHCT 85°F estimated by
Halliburton
Temp
Casin~ Size 17-5/8 29.7-lb/ft L-80 BTC Intermediate Casing
Basis 400/0 excess over gauge hole.
Tai1500-ft MD above top of N-sand.
Total Cement Wash 50-bbl water
Volume: 35-bbl
Spacer
Lead
tbbl Viscosified Spacer (Alpha) weighted to 10.50 ppg
6 -sx 10.7Ib/gal Class L-4.15 cuft/sx (cmt top at 3536')'"
, 90~ above the top of Ugnu " " ."
""""""~"""""""""*"""."""""",.".",.,.,.","'",."".,.""".....".,.,.""""","".,..."."".,.""",."""",.""",.""..,..,''''''''''''''''''''''''''''''''''''''''''''''''''''''''''"","""''"'"'''''',''1,''""""",''''''''''''''''''"""'"''''''''''''''''''''''''''''''''''''''''''''''""'"''''''''''''''''''''''''''''''''''''''''''''''''''""""""""""""..""""""""""",."","""""""""''''''''''''''''''''''''''''''''''''''."¡""""""""""",, """"',"'"¡""¡,,,,, "'","""'"
I~O -sx 1.5.8 Ib/gal Prem G - 1.15 cuft/sx (top of tail at
I -53' MD) 500' above the top of the N-sand
BHST =:: 80°F from SOR, BHCT 85°F estimated by
Halliburton
Tail
Temp
Evaluation Program:
13-1/2" Section
Open Hole: MWD/GRI IFRlCASANDRA
Cased Hole: N/A
9-7/8" Section
Open Hole: MWD/GRlRES IFRlCASANDRA
Cased Hole: N/A
6-1/8"Section
Open Hole: MWD/GRlRES ABIIIFRlCASANDRA
2
)
Formation Markers:
Formation Tops
Base Permafrost
Top UÇlnu
NA
NB
NC
NE
NF
Top OA
Top OB
TO
MOrkb
(ft)
1822
4036
4853
4928
5020
5062
5227
5326
5536
8600
TVDrkb
(ft)
1822
3622
3987
4017
4052
4067
4122
4151
4202
4226
CasingITubing Program:
Pore Pressure
(psi)
791
1572
1731
1744
1759
1765
1789
1802
1824
r )e Point MPS-12 Well Permit
Estimated EMW
(Ib/gal)*
8.35
8.35
8.35
8.35
8.35
8.35
8.35
8.35
8.35
q.-S
Hole Csg/ WtlFt GraÇ.le co~ Length Top Bottom
Size Tbg O.D. ./ MD / TVDrkb MD / TVDrkb
42-in 20-in* 92# H-40 Weld 112' 0 112-ft / 112-ft
13-1/2" 1 0-3/4" 45.5# L-80 BTC 2250' 0 2250' / 2250'
9-7/8" 7-5/8" 29.7# L-80 BTC 5536' 0 5536' / 4202'
6-1 /8" 4-1/2" 12.7# L-80 BTC 3214' 5386'/4120' 8600' / 4226'
OB
6-1/8" 4-1 /2" 12.7# L-80 BTC 3257' 5327'/4151 8584'/4171 '
OA
*The 20" casing is insulated
Recommended Bit Program:
BHA Hole Size Depth (MD) Bit Type Nozzle/Flow
rate
1 13-1/2" o - 2250 M ill tooth 3-15 & 1-1 0
2 9-7/8" 2250 - 5536' M ill tooth 3-15 & 1-1 0
3 6-1/8" 5536' - TO Security 3-12
FM2643
3
)
,. )e Point MPS-12 Well Permit
Well Control:
Surface Interval
· The surface hole will be drilled with a diverter.
· Integrity test:
· Kick tolerance:
I ntermediate and Production Intervals
· Maximum anticipated BHP: 1 ,824-psi !f4,204-ft TVDss - Top of OB-sand
· Maximum surface pressure: 1,403-psi @ surface
(Based on BHP and a full column of gas from TD @ 0.1-psi/ft)
· Planned BOP test pressure: Diverter will be function tested. BOPs: Test annular 250-psi low
and 2,500-psi high, and rams to 250-psi low and 4,000-psi high."'-
An FIT to 11.5-lb/gal will be made on the 7-5/8" casing shoe.
25.5-bbl with 10.0-lb/gal mud and FIT of 11.4-lb/gal @ 10-3/4" ,,/
casing shoe.
9.2-lb/gal NaCI I 6.8-lb/gal Diesel
· Planned completion fluid:
Drilling Hazards & Contingencies:
Hydrates
/'
· Hydrates have not been seen on S pad, but has been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+1-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
· Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation
· We do not expect losses while drilling this well.
· Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
· It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud.
4
)
)e Point MPS-12 Well Permit
Pad Data Sheet
· Please Read the S-Pad Data Sheet thoroughly.
Breathing
· N/A
Hydrocarbons
· Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
· NA
Hydrogen Sulfide
· MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
· MPS-12 has no anti-collision issues.
5
) r )e Point MPS-12 Well Permit
DRILL & COMPLETION PROCEDURE
Pre-Rig Operations
1. Install 20-in insulated conductor.
Procedure
1. MIRU. NU diverter on 20-in conductor and function test. /'
2. Dril/13-1/2" surface hole as per directional ~n.
3. Case and cement 10-3/4" surface casing.
4. NO diverter, NU BOPE and test.
5. Perform FIT.
6. Drill 9-7/8" hole to top OB-sand as per directional plan.
7. Case and cement 7-5/8" intermediate casing. Freeze protect 7-5/8" x 10-3/4" annulus
8. Perform FIT. ,/'
9. Drill 6-1/8" OB-sand lateral as per directional plan. /'
10. Run 4-1/2" uncemented slotted liner and hang off 150-ft inside 7-5/8" casing.
11. Set whipstock and mill window at top of OA-sand. /"
12. Drill 6-1/8" OA-sand lateral as per directional plan.
13. Pull whipstock.
14. ~un 4~ 1 /2"uncemented slotted liner with Baker Hookwall Hanger and hang off in 7.(þ-
In casing.
15. Displace drilling mud to brine.
16. Run 4-1/2" jet pump completion as per schematic.
17. Land tubing hanger and test.
18. Set BPV.
19. NO BOP.
20. Install and test tree.
21. Pull BPV.
22. Test 7-5/8" x 4-1/2" annulus.
23. Freeze protect thru GLM.
24. Install BPV and secure well.
25. RD/MO.
//.
6
TREE: Cameron 4-1/16" 5M
WELLHEAD: FMC Gen 6 11 ", 5M
Tubing Head: 11" x 4-1/2",
, FMC Tubing Hanger
PHUPUSI::LJ COMt-'Li:: liON
--,p . P~-12 -)1
KB. ELEV =66.5'
Cellar Box ELEV = 38.0'
1121
1f~
20" 92 I bitt , H-40 Welded /
Insulated
Diesel Freeze protect to
750' MD
10-3/4" 45.5#, L-80, BTC-M
Casing Drift: 9.875
Casing 10: 9.794
Coupling 00: 11.75"
Burst: 5,210 psi
Collapse: 2,480 psi
..411
9.2 KCI with corrosion
inhibitor as packer fluid
/
Jet Pump Installed in -
Sliding Sleeve Post rig!
~ III
.. '3, ."
7-5/8" 29.7#, L-80, BTC-M
Casing Drift: 6.75
Casing 10: 6.875
Coupling 00: 11.75"
Burst: 6,890 psi
Collapse: 4,790 psi
Window in 7-5/811 casing @ 5,327' MD
Well Inclination @ Window = 74 Degrees
4-1/2" liner top @ 5,386' MD (150' lap)
~
7.62511 Casing Shoe @ 5,536' MD,4202'
TVD
Well Inclination @ Shoe = 78 Degrees
PBTD
TO
DATE
130 Sep 02
COMMENTS
Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion
REV. BY
SKC
... 42" Hole
4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD , 2000' TVD,
RP shear valve open position, "X" Nipple
(2.813" ID) 70' below GLM
4-1/2", 12.6Iblfl, L-80, IBT-M Coupling OD: 5.2"
Drift/ID: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7.500. 80%=6.000 psi
.... 10-3/4"@ 2,250' MD, 2250' TVD/RKB
'SIW 1- Wire
Phoenix Pressure Gauge (3.850" ID, W/BIW I· wire down
to lower sensor)
Phoenix Pressure Gauge (2.840" ID)
7-5/8" x 4-1/2" Premier Packer ISet @ 5,300' MD, 4143' TVD I
3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod
Wireline Entry Guide
\~
6-1/8" OA Lateral TD 18,584' MD 1 /'
--...
----
- - --
- -
OA Horizontal 6-1/8" hole
r......
...... -
- -
- -
- -
4-1/211 Slotted Liner W/Hookwall hanger
.~
"
9-7/8" Hole
6-1/8" OB Lateral TD
/'
18,600' MD I
,
- - --
08 Horizontal 6-1/8" hole
------
4-1/2" Slotted Liner & Hanger
Milne Point Unit
WFI I : MPS-1?
API NO:
BP Expioratíon (A!8.sk~))
Dale: 121]612002
Dale:
Date:
Plan: MPS- 12 wp05 (plan MPS- ]2IPlan MPS-12
Created By: Ken Allen
Checked:
Reviewed:
SURVEY PROGRAM
Depth Fm Depth To S",veyiPIan Tool
33.00 1300.00 Planned: MPS-]2 "POS VB CB-GYRO-SS
1300.00 8600.95 Planned: MPS-12 "POS VB MWIHFR+MS
REFERENCE INFORMATION
Co-<>rdinate (NÆ) Refereoce: Wen Ceooe: Plan MPS-I2, True North
Vetûcal (IVD) Refen:nce: S-Pad Dev 72.00
Section (VS) Reference: SIoI - (O.ooN,O.ooE)
Measured Depth Reference: S-Pad Dev 72.00
CakuJatioo MelOOd: Minimum ÛJIwI1lre
COMPANY DETAILS
BP Amoco
Minimum CUIV3ll1'C
ISCWSA
T ray CyliOOcf North
Ellipücal + Casing
Rules Based
ò
WELL DETAll.S
Name #II-S +FJ-W NŒtbing Eastiog Latitl>Je Longitude SloI
Plan MPS-I 28.05 42739 6000002.25 5659\1.42 70"24'37.604N ]49"27'47.698W WA
TARGETDETAll.S
Name 1VD #II-S +FJ-W Northing Eastiog Shape
MPS.12(OB) TI 4202.00 1545.80 1117.45 6001563.00 567621.00 Point
MPS 12 Hardline 4202.00 4644.01 1967.83 6004663.00 567844.00 Polygon
MPS-]2 poly 4216.00 ]479.79 1943.90 600]499.00 567848.00 Polygoo
MPS-12(OB) T4 42\1.00 405459 1892.6] 6004073.00 567774.00 Point
MPS-12(OB)T5 4226.00 44745] 2]3435 6004495.00 568012.00 Point
MPS-I2(OB) T2 4232.00 3018.87 1618.44 6003035.00 567509.00 Point
MPS- ]2(OB) 1'3 4252.00 37~.IO 111650 6003721.00 567601.00 Point
SECTION DETAILS
Sec MD Inc Azi TVD +N/-S +FJ-W DLeg TFace VSec Target
1 33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00
2 2250.00 0.00 0.00 2250.00 0.00 0.00 0.00 0.00 0.00
3 3827.80 63.11 54.27 3527.54 458.19 636.92 4.00 0.00 687.76
4 4651.56 63.11 54.27 3900.09 887.24 1233.33 0.00 0.00 1331. 78
5 5536.93 78.00 20.00 4202.00 1545.80 1717.45 ~oo -71.89 2134.62 MPS-12(OB)T1 ._
6 5773.31 89.79 354.01 4227.52 1776.71 1745.22 2.00 -67.30 2354.99
7 6938.80 89.79 354.01 4231.70 2935.82 1623.51 0.00 0.00 3348.77
8 7022.03 89.79 359.00 4232.00 3018.87 1618.44 6.00 90.06 3421.55 MPS-12(OB) T2
9 7072.03 86.93 359.90 4233.43 3068.85 1617.96 6.00 162.56 3466.45
10 7260.04 86.93 359.90 4243.51 3256.59 1617.63 0.00 0.00 3635.76
11 7722.21 91.00 25.00 4252.00 3704.10 1716.50 5.50 81.16 4082.24 MPS-12(OB) T3
12 7832.98 96.39 26.28 4244.87 3803.72 1764.31 5.00 13.34 4192.73
13 7992.08 96.39 26.28 4227.16 3945.49 1834.33 0.00 0.00 4350.84
14 8116.24 93.00 29.93 4217.00 4054.59 1892.61 4.00 132.86 4474.41 MPS-12(OB) T4
15 8231.55 88.39 29.93 4215.60 4154.50 1950.13 4.00 180.00 4589.34
16 8600.95 88.39 29.93 4226.00 4474.51 2134.35 0.00 0.00 4957.49 MPS-12(OB) T5
FORMATION TOP DETAILS
No. TVDPath MDPath Fonnation
1 1822.00 1822.00 BPRF
2 3622.00 4036.67 TUZC
3 3987.00 4853.09 SBF2-NA
4 4017.00 4928.11 SBFI-NB
5 4052.00 5020.51 SBE4-NC
6 4067.00 5062.05 SBE2-NE
7 4122.00 5227.77 SBEI-NF
8 4151.00 5326.95 TSBD-OA
9 4174.00 5414.40 TSBC
10 4202.00 5536.93 TSBB-OB
CASING DETAILS
No. TVD MD Name Size
1 2250.00 2250.00 103/4' 1O.750·-----~
2 4202.00 5536.93 75/8" 7.625
3 4226.00 8600.94 41/2' 4.500
Cakulalion ~kthod:
~": ~k=~
Error Surface:
Wamjn~ Mcrhod:
All TVD depths are
ssTVD plus 72'for RKBE.
800
, ]~
03/4" "80 Start Dir 4/100'
.~
c::.
#
##
... .,
"" ~
,
BPRF :/
2000
-
600
:§'
~
~
.c
p.
Ö
]
'2
> 2400
2
E-
2250'TVD
2250' MD,
-
MD, 4227.52' TVD
~StartE~:~
S 3.51'TVD
1/100' : 7992.08' MD. 4227.16'TVD
End Dir : 8231.55' MD, 4215.6' TVD
o 4112"
m;u.;' , . : : . . - ~~u"c1f- ! Plan MPS-12 (plan MPS-12Ll
¡#Ffflj;~~1t¡;:~Z¡Efr MP'·l2_
. . . - . - -.
.. . - -.. - .' -
~__ _~u u .n___'____.;,,__ :. ....'.mn_!_ ,'mon '..n_'~_"u:'u,,__; u ; .;........ ;
.. .. -
I I I I I I I
3200 4800
[800ft/in]
5600
I
4000
~~.
5773.31'
2400
Vertical Section at 25.50
End Dir
TSBD-OA
3827.8' MD, 3527.54' TVD
EndDi
800
o
3200
4000
Plan: MPS-12 wp05 (plan MPS-I2IPlan MPS-12
Created By: Ken Allen Date:
Checked: Date:
Reviewed: Date:
Tool
CB-GYRO-SS
MWD+IFR+MS
SURVEY PROGRAM
S""'-eyIPIan
Depth Fm Depth To
3.00 1300.00
300.00 8600.95
REFERENCE INFORMA nON
Co-ordinal< (NiE) Refereo<e: Well Centœ: Plan MPS-I2. True Non\¡
Verûc31 (IVD) Refeœuœ: s-I'ad Dev 72.00
Se<tion (VS) Reference: Slot - (O.OON,O.OOE)
Measured Depth Rel'ermce: s-I'ad Dev 72.00
Caku1aûon Method: Minin:nm Coo.>ature
COMPANY DETAILS
I' Amoco
Mininun Curvattn
ISCWSA
Tray C)1indcr North
Ðliplical t Casing
Rul'S 0....'<1
ò
MPS 12 Hardline
L_ 41/2"
MPS 12((JBln /~Im MPS-12wp05
/~~J _ / Total Depth: 8600.95' MD, 4226' TVD
/ /
MPS-1LIOBI 4 I ____
f ¡---"'i! End Dir : 8231.55' MD, 4215.6' TVD
- . /) ----.;'
" I / " Slart Dir 4/100': 7992.08' MD, 4227.l6'TVD
.12(OBI T.'! ,---/
-r" /--......:~' End Dif~: 7832.98' MD, 4244.87' TVD
, ¡ I, / / SI:Lrt Dir§/IOO': 7722.21' MD, 4252TVD
· / '
U¡ ,'! .. ....
it r--¡ 5,.1/' Ð" :3.5/100': 7260.04' MD, 4243.51'TVD
· I I' \ .
).6) T2 \n·~ E lid Dir : 7072.03' MD, 4233.43' TVD
· \ n, Sr:JIT Dir:6/100': 6938.8' MD, 4231.7'TVD
\ \ .
\ l \ .
I i ~
\ !,
~\ '. \
I \ \
\ I \
\ I i \
\ '< \
~ \ ~
'L I \
\LJ
, I \ End Pit,: 5773.31' MD, 4227.52' TVD
7 5/~" '. .J \ .
MPS-12(PB1 T --r:=tt=-~i1l1þ01Y 5536.93' MD, 4202TVD
j ..
J'
i
WELL DETAll.S
N:uœ +w-s +FJ·W Nodhing Easting Latinxle Loog;tude Slot
Plan MPS·12 28.05 42739 600000225 565917.42 70'24·37.604N 14!n7'47.698W NlA
TARGETDETAH.S
Næœ TVD +W-S +FJ-W Northing Easting Shape
MPS-12(OB) T1 4202.00 1545.80 J7l7.45 6001563.00 567621.00 Point
MPS 12 H_ 4202.00 4614.01 1%7.83 6004663.00 567844.00 1'01),800
MPS-12 pol}' 4216.00 1479.79 1943.90 6001499.00 567848.00 1'01)'800
MPS-12(OB)T4 4217.00 405459 1892.61 6004073.00 56m4.00 Point
MPS-I2(OB) T5 4226.00 447451 213435 6004495.00 568012.00 Point
MPS-I2(OB) T2 4232.00 3018.87 1618.44 6003035.00 567509.00 Point
MPS-I2(OB) T3 4252.00 3704.10 171650 6003721.00 567601.00 Point
PJanoed; MPS-12 wp05 V8
PJanoed; MPS-12 wp05 V8
C.kuJalioo M.'Ihod:
~;~=~
Error SurfKe:
W.mil1! McthaI:
4800-
Target
MPS-12(OB,,-,,,
MPS-12(OB) T2
MPS-12(OB) T3
VSec
0.00
0.00
687.76
1331.78
2134.62
2354.99
3348.77
3421.55
3466.45
3635.76
4082.24
4192.73
4350.84
4474.41
4589.34
4957.49
SECTION DErAILS
Azi TVD +N/-S +EI- W DLeg TFace
0.00 33.00 0.00 0.00 0.00 0.00
0.00 2250.00 0.00 0.00 0.00 0.00
54.27 3527.54 458.19 636.92 4.00 0.00
54.27 3900.09 887.24 1233.33 0.00 0.00
20.00 4202.00 1545.80 1717.45 4.00 -71.89
354.01 4227.52 1776.71 1745.22 12.00 -67.30
354.01 4231.70 2935.82 1623.51 0.00 0.00
359.00 4232.00 3018.87 1618.44 6.00 90.06
359.90 4233.43 3068.85 1617.96 6.00 162.56
359.90 4243.51 3256.59 1617.63 0.00 0.00
25.00 4252.00 3704.10 1716.50 5.50 81.16
26.28 4244.87 3803.72 1764.31 5.00 13.34
26.28 4227.16 3945.49 1834.33 0.00 0.00
29.93 4217.00 4054.59 1892.61 4.00 132.86
29.93 4215.60 4154.50 1950.13 4.00 180.00
29.93 4226.00 4474.51 2134.35 0.00 0.00
Inc
0.00
0.00
63.11
63.11
78.00
89.79
89.79
89.79
86.93
86.93
91.00
96.39
96.39
93.00
88.39
88.39
MD
33.00
2250.00
3827.80
4651.56
5536.93
5773.31
6938.80
7022.03
7072.03
7260.04
7722.21
7832.98
7992.08
8116.24
8231.55
8600.95
ec
l
I
5
¡
7
¡
)
o
.1
2
3
4
5
6
4000
3200
MPS-12(OB) T4
MPS-12(OB) T5
FORMA nON TOP DErAILS
No. TVDPath MDPath Formation
1 1822.00 1822.00 BPRF
2 3622.00 4036.67 TUZC
3 3987.00 4853.09 SBF2-NA
4 4017.00 4928.11 SBFI-NB
5 4052.00 5020.51 SBE4-NC
6 4067.00 5062.05 SBE2-NE
7 4122.00 5227.77 SBEl-NF
8 4151.00 5326.95 TSBD-OA
9 4174.00 5414.40 TSBC
10 4202.00 5536.93 TSBB-OB
.~
Size
10.750
7.625
4.500
CASING DErAILS
Name
103/4'
75/8"
4 1/2"
MD
2250.00
5536.93
8600.94
TVD
2250.00
4202.00
4226.00
No.
1
2
3
E
2
o
~
~ 2400
:;:
t::
~
:;:
'5
o
VJ
All TVD depths are
ssTVD plus 72'for RKBE.
~/i
~
-
600
I
3200
3900.09TVD
I
2400
MD,
'i/Í'
4h'i
TVD
I
I
600
W est( - )/East( + ) [800ft/in]
I
on pi''
I
't'"
'\1
3827,;8' M [
,
..
800
800
) BP )
KW A Planning Report MAP
:Oåt~; <~211.~/?qQ~: .:TiïJJe: 11':0: T> . .. ... ... :p~ge:l (
Ç9~O..~iµ..~~~~)~~f~re..s.,: VYEJH::PJ ·P~T1~.TrUeNbrtlJ ·
.... .··y~~~~ê~'.cJ:YP)~efereø.ç.,:·· ..:...§t~~...~...".....·... .... ,.. {... 2..-9..:'..... ..:.. .:... .......:. .:.:......... .... ..,.
·S~f~~~JY~)·.·~~· çe;i. ·\IV~IfW;P9N¡º~9QF,?5;50Aii)·. .
... ···~ury~ÿÇålc~låti .. ~tMd: ··Mlnimû,yrCuNatüt'e· . Db: EOräcle<
····çom:panhB.8Amoco .
!:Ji'i~hfi: ..·I\i1Utle.'P9int
:~~){.::r .... .P~~1¡2 :..
..·'W~~,,~~~h: ·Mp$~t~
Field: Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: M pt S Pad
Alaska, Zone 4
Well Centre
BGGM2002
Site Position: Northing: 5999978.00 ft Latitude: 70 24 37.329 N
From: Map Easting: 566345.00 ft Longitude: 149 27 35.171 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.51 deg
Well: Plan MPS-12 Slot Name:
Well Position: +N/-S 28.05 ft Northing: 6000002.25 ft Latitude: 70 24 37.604 N
+E/-W -427.39 ft Easting : 565917.42 ft Longitude: 149 27 47.698 W
Position Uncertainty: 0.00 ft
Wellpath: Plan MPS-12
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
S-Pad Dev
6/29/2001
57460 nT
Depth From (TVD)
ft
0.00
+N/-S
ft
0.00
Height 72.00 ft
Plan: MPS-12 wp05
Date Composed:
Version:
Tied-to:
Principal: Yes
Casing Points
Well Ref. Point
0.00 ft
Mean Sea Level
26.28 deg
80.78 deg
Direction
deg
25.50
12/12/2002
8
From Well Ref. Point
1\10 TVD · Dillmeter
· ····ft ft in
2250.00 2250.00 10.750 13.500 10 3/4"
5536.93 4202.00 7.625 9.875 75/8"
8600.94 4226.00 4.500 6.125 4 1/2"
Formations
MD TVD·· Formations Lithology J)iliAng1e Dip J)irection
ft ft deg: deg
1822.00 1822.00 BPRF 0.00 0.00
4036.67 3622.00 TUZC 0.00 0.00
4853.09 3987.00 SBF2-NA 0.00 0.00
4928.11 4017.00 SBF1-NB 0.00 0.00
5020.51 4052.00 SBE4-NC 0.00 0.00
5062.05 4067.00 SBE2-NE 0.00 0.00
5227.77 4122.00 SBE1-NF 0.00 0.00
5326.95 4151.00 TSBD-OA 0.00 0.00
5414.40 4174.00 TSBC 0.00 0.00
5536.93 4202.00 TSBB-OB 0.00 0.00
0.00 OWC 0.00 0.00
Targets
Map Map <- Latitude --> <- Longitude ->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec
Dip. Dir. ft ft ft ft ft
MPS-12(OB) T1 4202.00 1545.80 1717.45 6001563.00 567621.00 70 24 52.805 N 149 26 57.348 W
MPS-12 poly 4216.00 1479.79 1943.90 6001499.00 567848.00 70 24 52.155 N 149 26 50.709 W
-Polygon 1 4216.00 1479.79 1943.90 6001499.00 567848.00 70 24 52.155 N 149 26 50.709 W
') BP)
KW A Planning Report MAP
..ç~JÎtij~ný: BP ArMco·. .
.··Fiëld~' .. . MilriePoirit ..
". .Sf~e:.. ..... 'M~t.i$:'~å( .. ...... ....
. ·WeU:..·· 'RI~I'iMP~,,~~··
~ellpa~~: '...pl$n MP$A12
Targets
. .. .. . ... .... .
. .... ... ..... ....... ....
::[)~te: 12/16/4Ö02Time:' 11:02:.05 . .... .. Page: .." 2·
., ,···q?b9r:~i~å~e~tJ.~~ë~re~,4;e:·)W~JI;~lliIri;,MP9-1.2 IrÜeNþr1n. .
. . .Y~~~~~~I('l'~P).Ji~'~~~øç¢: '···,~Ÿ7g;º·< . ...... ..... .... .
'~~~~?,~.(y. ·t~r~nc~: ... ........ X·,,· ,. . .. " .... qqN,P,QOç:·~5.;50~n
$uryeyC~ ti~oMetbQd:.·· iriirnuniquryatürø . Db: Oråêlê ..
··+N/-:S ···tE:/2W ··.·.····."M~p,··.·· . ·NJ:~Þ·· ; .. .,.<H--.þ~~¡þ1(1~L.;,.~ ., . <ë~L~~gi~l1~e*
'.·NqrtÞ~t!g . .. .~;isti~g p¢~M}n. Hß,~C .',' i)egl\iJ.iÎl· ....~~~,.
ft ..'.. ff . .ft ;.. , )ft ...
-Polygon 2 4216.00 1459.68 1616.68 6001476.01 567521.00 70 24 51.958 N 149 27 0.303 W
-Polygon 3 4216.00 3152.98 1381.59 6003167.00 567271.00 70 25 8.612 N 149 27 7.185 W
-Polygon 4 4216.00 3683.71 1533.29 6003699.00 567417.99 70 25 13.831 N 149 27 2.734 W
-Polygon 5 4216.00 4620.50 1910.61 6004639.00 567787.00 70 25 23.044 N 149 26 51.662 W
-Polygon 6 4216.00 4450.81 2327.17 6004473.00 568205.00 70 25 21.374 N 149 26 39.446 W
-Polygon 7 4216.00 3604.32 1802.63 6003622.00 567688.00 70 25 13.050 N 149 26 54.836 W
-Polygon 8 4216.00 3136.97 1721.49 6003154.00 567610.99 70 25 8.454 N 149 26 57.219 W
MPS-12(OB) T4 4217.00 4054.59 1892.61 6004073.00 567774.00 70 25 17.478 N 149 26 52.194 W
MPS-12(OB) T5 4226.00 4474.51 2134.35 6004495.00 568012.00 70 25 21.607 N 149 2645.101 W
MPS 12 Hardline 4226.00 4644.01 1967.83 6004663.00 567844.00 70 25 23.275 N 149 26 49.984 W
-Polygon 1 4226.00 4644.01 1967.83 6004663.00 567844.00 70 25 23.275 N 149 26 49.984 W
-Polygon 2 4226.00 4607.71 2681.61 6004633.00 568558.00 70 25 22.916 N 149 26 29.050 W
MPS-12(OB) T2 4232.00 3018.87 1618.44 6003035.00 567509.00 70 25 7.293 N 149 27 0.241 W
MPS-12(OB) T3 4252.00 3704.10 1716.50 6003721.00 567601.00 70 25 14.032 N 149 26 57.361 W
Plan Section Information
,. MD IöCl Adm·. ..TvD +N/-S· +E/~W . DLS ,·.·BUíld. . Turn .., 1'1"0..
At deg qøg· it ft ft qèg/1P9ftdeg/1QOftdeg/10.0ft .. ..'p~~L .
33.00 0.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00
2250.00 0.00 0.00 2250.00 0.00 0.00 0.00 0.00 0.00 0.00
3827.80 63.11 54.27 3527.54 458.19 636.92 4.00 4.00 0.00 0.00
4651.56 63.11 54.27 3900.09 887.24 1233.33 0.00 0.00 0.00 0.00
5536.93 78.00 20.00 4202.00 1545.80 1717.45 4.00 1.68 -3.87 -71.89 MPS-12(OB) T1
5773.31 89.79 354.01 4227.52 1776.71 1745.22 12.00 4.99 -11.00 -67.30
6938.80 89.79 354.01 4231.70 2935.82 1623.51 0.00 0.00 0.00 0.00
7022.03 89.79 359.00 4232.00 3018.87 1618.44 6.00 -0.01 6.00 90.06 MPS-12(OB) T2
7072.03 86.93 359.90 4233.43 3068.85 1617.96 6.00 -5.72 1.80 162.56
7260.04 86.93 359.90 4243.51 3256.59 1617.63 0.00 0.00 0.00 0.00
7722.21 91.00 25.00 4252.00 3704.10 1716.50 5.50 0.88 5.43 81.16 MPS-12(OB) T3
7832.98 96.39 26.28 4244.87 3803.72 1764.31 5.00 4.86 1.16 13.34
7992.08 96.39 26.28 4227.16 3945.49 1834.33 0.00 0.00 0.00 0.00
8116.24 93.00 29.93 4217.00 4054.59 1892.61 4.00 -2.73 2.93 132.86 MPS-12(OB) T4
8231.55 88.39 29.93 4215.60 4154.50 1950.13 4.00 -4.00 0.00 180.00
8600.95 88.39 29.93 4226.00 4474.51 2134.35 0.00 0.00 0.00 0.00 MPS-12(OB) T5
Survey
loci Azim TVD Sys TVD MapN MapE VS DLS TFO ToollComniëöt
deg deg ft ft ft ft ft deg/100ff deg
33.00 0.00 0.00 33.00 -39.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
100.00 0.00 0.00 100.00 28.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
200.00 0.00 0.00 200.00 128.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
300.00 0.00 0.00 300.00 228.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
400.00 0.00 0.00 400.00 328.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
500.00 0.00 0.00 500.00 428.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
600.00 0.00 0.00 600.00 528.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
700.00 0.00 0.00 700.00 628.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
800.00 0.00 0.00 800.00 728.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
900.00 0.00 0.00 900.00 828.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
1000.00 0.00 0.00 1000.00 928.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
1100.00 0.00 0.00 1100.00 1028.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
1200.00 0.00 0.00 1200.00 1128.00 6000002.25 565917.42 0.00 0.00 0.00 CB-GYRO-SS
1300.00 0.00 0.00 1300.00 1228.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
1400.00 0.00 0.00 1400.00 1328.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
) BP )
KW A Planning Report MAP
Datê:.12/16/200Z,.···.,·..···.·;i.Tinte:11:Q2:Qp.. .... ... .... .·.·..·~~ge;. .. ..·.3.
·Ç97ºt4iº~t¢(NFJ) êfer¢ri¿~:·· . ···.VVøll:r?I.~pM~~~1.,~,or,.uØ\J~l1h
.,... ..,;Vêt~i~~i.(T.v: . ... SJ~açipe\(~?~Q..,. .i/d
·~ect~()JÌð;r . .... .... WE3.II(P;qqN.,P;()O~¡?~~$Q~i).
Suryeyt:â . ···MiniriïurrtCÜ¡;vature. . . Db: o raCiEr
Survey
1500.00 0.00 0.00 1500.00 1428.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
1600.00 0.00 0.00 1600.00 1528.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
1700.00 0.00 0.00 1700.00 1628.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
1800.00 0.00 0.00 1800.00 1728.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
1822.00 0.00 0.00 1822.00 1750.00 6000002.25 565917.42 0.00 0.00 0.00 BPRF
1900.00 0.00 0.00 1900.00 1828.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
2000.00 0.00 0.00 2000.00 1928.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
2100.00 0.00 0.00 2100.00 2028.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
2200.00 0.00 0.00 2200.00 2128.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
2250.00 0.00 0.00 2250.00 2178.00 6000002.25 565917.42 0.00 0.00 0.00 MWD+IFR+MS
2300.00 2.00 54.27 2299.99 2227.99 6000002.77 565918.12 0.76 4.00 0.00 MWD+IFR+MS
2400.00 6.00 54.27 2399.73 2327.73 6000006.89 565923.75 6.88 4.00 360.00 MWD+IFR+MS
2500.00 10.00 54.27 2498.73 2426.73 6000015.11 565934.97 19.08 4.00 0.00 MWD+IFR+MS
2600.00 14.00 54.27 2596.53 2524.53 6000027.40 565951.74 37.30 4.00 0.00 MWD+IFR+MS
2700.00 18.00 54.27 2692.63 2620.63 6000043.69 565973.96 61.45 4.00 360.00 MWD+IFR+MS
2800.00 22.00 54.27 2786.58 2714.58 6000063.90 566001.54 91.43 4.00 0.00 MWD+IFR+MS
2900.00 26.00 54.27 2877.92 2805.92 6000087.93 566034.34 127.07 4.00 0.00 MWD+IFR+MS
3000.00 30.00 54.27 2966.20 2894.20 6000115.68 566072.19 168.22 4.00 360.00 MWD+IFR+MS
3100.00 34.00 54.27 3050.98 2978.98 6000146.99 566114.92 214.66 4.00 0.00 MWD+IFR+MS
3200.00 38.00 54.27 3131.87 3059.87 6000181.73 566162.32 266.17 4.00 0.00 MWD+IFR+MS
3300.00 42.00 54.27 3208.46 3136.46 6000219.71 566214.15 322.51 4.00 0.00 MWD+IFR+MS
3400.00 46.00 54.27 3280.38 3208.38 6000260.76 566270.16 383.39 4.00 0.00 MWD+IFR+MS
3500.00 50.00 54.27 3347.28 3275.28 6000304.68 566330.09 448.52 4.00 0.00 MWD+IFR+MS
3600.00 54.00 54.27 3408.83 3336.83 6000351.24 566393.63 517.58 4.00 360.00 MWD+IFR+MS
3700.00 58.00 54.27 3464.74 3392.74 6000400.23 566460.48 590.23 4.00 0.00 MWD+IFR+MS
3800.00 62.00 54.27 3514.73 3442.73 6000451.41 566530.31 666.13 4.00 0.00 MWD+IFR+MS
3827.80 63.11 54.27 3527.54 3455.54 6000466.00 566550.21 687.76 4.00 0.00 MWD+IFR+MS
3900.00 63.11 54.27 3560.19 3488.19 6000504.05 566602.14 744.20 0.00 0.00 MWD+IFR+MS
4000.00 63.11 54.27 3605.42 3533.42 6000556.77 566674.07 822.38 0.00 0.00 MWD+IFR+MS
4036.67 63.11 54.27 3622.00 3550.00 6000576.10 566700.45 851.05 0.00 0.00 TUZC
4100.00 63.11 54.27 3650.64 3578.64 6000609.49 566746.00 900.57 0.00 0.00 MWD+IFR+MS
4200.00 63.11 54.27 3695.87 3623.87 6000662.20 566817.94 978.75 0.00 0.00 MWD+IFR+MS
4300.00 63.11 54.27 3741.09 3669.09 6000714.92 566889.87 1056.93 0.00 0.00 MWD+IFR+MS
4400.00 63.11 54.27 3786.32 3714.32 6000767.64 566961.80 1135.11 0.00 0.00 MWD+IFR+MS
4500.00 63.11 54.27 3831 .54 3759.54 6000820.35 567033.73 1213.29 0.00 0.00 MWD+IFR+MS
4600.00 63.11 54.27 3876.77 3804.77 6000873.07 567105.67 1291.47 0.00 0.00 MWD+IFR+MS
4651.56 63.11 54.27 3900.09 3828.09 6000900.25 567142.76 1331.78 0.00 0.00 MWD+IFR+MS
4700.00 63.73 52.22 3921.76 3849.76 6000926.47 567177.22 1370.12 4.00 288.11 MWD+IFR+MS
4800.00 65.09 48.05 3964.96 3892.96 6000984.89 567245.89 1452.09 4.00 289.03 MWD+IFR+MS
4853.09 65.86 45.87 3987.00 3915.00 6001018.16 567280.89 1497.04 4.00 290.83 SBF2-NA
4900.00 66.57 43.97 4005.92 3933.92 6001048.82 567310.93 1537.52 4.00 291.73 MWD+IFR+MS
4928.11 67.01 42.84 4017.00 3945.00 6001067.75 567328.52 1562.11 4.00 292.50 SBF1-NB
5000.00 68.15 39.99 4044.42 3972.42 6001117.96 567372.02 1626.00 4.00 292.94 MWD+IFR+MS
5020.51 68.49 39.18 4052.00 3980.00 6001132.75 567384.03 1644.49 4.00 294.03 SBE4-NC
5062.05 69.18 37.57 4067.00 3995.00 6001163.33 567407.81 1682.25 4.00 294.33 SBE2-NE
5100.00 69.83 36.10 4080.29 4008.29 6001191.96 567428.86 1717.10 4.00 294.92 MWD+IFR+MS
5200.00 71.58 32.29 4113.34 4041.34 6001270.47 567481.18 1810.38 4.00 295.43 MWD+IFR+MS
5227.77 72.09 31.25 4122.00 4050.00 6001293.02 567494.87 1836.61 4.00 296.69 SBE1-NF
5300.00 73.42 28.56 4143.42 4071.42 6001353.11 567528.73 1905.38 4.00 297.01 MWD+IFR+MS
5326.95 73.92 27.57 4151.00 4079.00 6001376.04 567540.69 1931.21 4.00 297.81 TSBD-OA
5400.00 75.31 24.91 4170.38 4098.38 6001439.47 567571.26 2001.63 4.00 298.09 MWD+IFR+MS
5414.40 75.59 24.38 4174.00 4102.00 6001452.20 567576.96 2015.57 4.00 298.80 TSBC
) BP ),
KW A Planning Report MAP
Survey
5500.00
5536.93
5550.00
5575.00
5600.00
5625.00
5650.00
5675.00
5700.00
5725.00
5750.00
5773.31
5800.00
5900.00
6000.00
6100.00
6200.00
6300.00
6400.00
6500.00
6600.00
6700.00
6800.00
6900.00
6938.80
6950.00
7000.00
7022.03
7050.00
7072.03
7100.00
7200.00
7260.04
7300.00
7400.00
7500.00
7600.00
7700.00
7722.21
7800.00
7832.98
7900.00
7992.08
8000.00
8100.00
8116.24
8200.00
8231.55
8300.00
8400.00
8500.00
8600.95
·I)j:¢)...
·deg
77.27
78.00
78.61
79.79
81.00
82.23
83.48
84.74
Date:··· 12/~()t4PP~·.· ...··...·..··[I'i ... . :..11:()2:q5.' ............... ... ii ..Påg~: ..4 .. .
Có2ó .~<NEJªe(t1reµce:. . . ~1I:171.~9·rvtF?$'i1g~T(lJeNqdn.
. ···......·..·.··M~~~i"p~~~~~r~~.ê~: . .7f~dP~Y·'l'?;9>···......·. t.. ......
.. ....~e~.~i~... .. .....)~~f~ft1nc.~: ............ ... ··¡W~!1(9·0p~;9!09s;.?~~PO~1)
:: $~..yeyCälculatio~M~tb~d~ .. MinimÜm çurvat\,lre. .. ··Db:. .OråCl.e··
.. . . TVD .. .s...·Y$. T. VD...·· ............ ,.
·ft ··ft
4194.09 4122.09
4202.00 4130.00
4204.65 4132.65
Áiiô{ ..
døg··
21.31
20.00
18.52
15.72
12.93
10.17
7.42
4.68
86.02 1.96
87.30 359.24
88.59 356.53
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.01
89.79 354.68
89.79 357.68
89.79 359.00
88.19 359.50
86.93 359.90
86.93 359.90
86.93 359.90
86.93 359.90
87.27
88.13
89.02
89.91
90.80
91.00
94.78
96.39
96.39
96.39
96.17
93.44
93.00
89.65
88.39
88.39
88.39
88.39
88.39
2.07
7.51
12.94
18.37
23.79
25.00
25.90
26.28
26.28
26.28
26.52
29.45
29.93
29.93
29.93
29.93
29.93
29.93
29.93
4209.33
4213.50
4217.15
4220.26
4222.82
4224.84
4226.29
4227.19
4227.52
4227.62
4227.97
4228.33
4228.69
4229.05
4229.41
4229.77
4230.12
4230.48
4230.84
4231.20
4231.56
4231.70
4231.74
4231.92
4232.00
4232.49
4233.43
4234.93
4240.29
4243.51
4245.53
4249.55
4252.03
4252.97
4252.35
4252.00
4248.08
4244.87
4237.41
4227.16
4226.30
4217.91
4217.00
4215.06
4215.60
4217.53
4220.34
4223.16
4226.00
4137.33
4141.50
4145.15
4148.26
4150.82
4152.84
4154.29
4155.19
4155.52
4155.62
4155.97
4156.33
4156.69
4157.05
4157.41
4157.77
4158.12
4158.48
4158.84
4159.20
4159.56
4159.70
4159.74
4159.92
4160.00
4160.49
4161.43
4162.93
4168.29
4171.51
4173.53
4177.55
4180.03
4180.97
4180.35
4180.00
4176.08
4172.87
4165.41
4155.16
4154.30
4145.91
4145.00
4143.06
4143.60
4145.53
4148.34
4151.16
4154.00
6001529.14
6001563.00
6001575.12
6001598.64
6001622.58
6001646.85
6001671.39
6001696.13
6001721.02
6001745.97
6001770.92
6001794.13
6001820.64
6001919.99
6002019.34
6002118.68
6002218.03
6002317.38
6002416.73
6002516.07
6002615.42
6002714.77
6002814.11
6002913.46
6002952.00
6002963.14
6003012.99
6003035.00
6003062.96
6003084.96
6003112.89
6003212.73
6003272.68
6003312.57
6003412.17
6003510.65
6003607.13
6003700.70
6003721.00
6003791.43
6003821.03
6003881.00
6003963.39
6003970.47
6004058.85
6004073.00
6004145.92
6004173.40
6004232.99
6004320.05
6004407.11
6004495.00
567608.57
567621.00
567625.11
567632.13
567638.02
567642.76
567646.33
567648.73
567649.95
567649.99
567648.85
567646.73
567643.70
567632.39
567621.07
567609.75
567598.43
567587.11
567575.79
567564.47
567553.15
567541.84
567530.52
567519.20
567514.81
567513.60
567509.83
567509.00
567508.39
567508.08
567507.78
567506.73
567506.09
567506.43
567513.89
567530.76
567556.88
567592.01
567601.00
567633.76
567647.93
567676.89
567716.69
567720.12
567766.10
567774.00
567815.13
567830.62
567864.23
567913.33
567962.43
568012.00
· ...'þE¡$.1"~(:) .
. .. .d~g/19OftØeg
2098.67 4.00 298.93
2134.62 4.00 299.65
2147.34 12.00 292.70
2171.63 12.00
2195.81 12.00
2219.81 12.00
2243.57 12.00
2267.01 12.00
2290.08 12.00
2312.72 12.00
2334.85 12.00
2354.99 12.00
2377.75 0.00
2463.02 0.00
2548.28 0.00
2633.55 0.00
2718.82 0.00
2804.09 0.00
2889.35 0.00
2974.62 0.00
3059.89 0.00
3145.16 0.00
3230.42 0.00
3315.69 0.00
3348.77 0.00
3358.36 6.00
3401.95 6.00
3421.55 6.00
3446.63 6.00
3466.45 6.00
3491.63 0.00
3581.69 0.00
3635.76 0.00
3672.06 5.50
3765.49 5.50
3861.89 5.50
3960.37 5.50
4060.04 5.50
4082.24 5.50
4159.92 5.00
4192.73 5.00
4259.33 0.00
4350.84 0.00
4358.70 4.00
4458.24 4.00
4474.41 4.00
4557.89 4.00
4589.34 4.00
4657.55 0.00
4757.22 0.00
4856.88 0.00
4957.49 0.00
rrt>9.1/dómD1~lit .
MWD+IFR+MS
MPS-12(OB) T1
MWD+IFR+MS
293.00 MWD+IFR+MS
293.53 MWD+IFR+MS
293.99 MWD+IFR+MS
294.40 MWD+IFR+MS
294.74 MWD+IFR+MS
295.02 MWD+IFR+MS
295.24 MWD+IFR+MS
295.40 MWD+IFR+MS
295.49 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
90.06 MWD+IFR+MS
90.06 MWD+IFR+MS
90.05 MPS-12(OB) T2
162.56 MWD+IFR+MS
162.55 MWD+IFR+MS
180.00 MWD+IFR+MS
180.00 MWD+IFR+MS
180.00 MWD+IFR+MS
81.16 MWD+IFR+MS
81.05 MWD+IFR+MS
80.83 MWD+IFR+MS
80.70 MWD+IFR+MS
80.65 MWD+IFR+MS
80.68 MPS-12(OB) T3
13.34 MWD+IFR+MS
13.39 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
132.86 MWD+IFR+MS
132.88 MWD+IFR+MS
133.13 MPS-12(OB) T4
180.00 MWD+IFR+MS
180.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MWD+IFR+MS
0.00 MPS-12(OB) T5
P054998
12/19/2002 INV# CK121702G
DATE CHECK NO.
DATE
12/19/2002
P054998
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
NET
PERMIT TO DRILL FEE
(Y) PS -I Z I L... (
KECEIVED
FEB 0 3 2003
AI ska '1i1 & Gas Cons. Commiss.on
a Anchorage
I
THE ATTACHED CHECK IS IN PAVMENT FOR ITEMs DESCRIBEDABDVE. __
- -
BP EXPLORATION,
PRUDHOE BAY UNIT
PO BOX 196612
ANCHORAGe, AK995Jß-6612
PAY:
TO THE
ORDER
OF:
. ,
. .
.",. December 19,2002
**********""****$100.00 ***
". 0 5 t. q q a II' ': 0.. . 20 38 q 5 I: 0 ~ 2 ? a q b II'
NÔ1~W·.I..'R~~~E.'}..~2QF~~~:·~· .; ~. .. _"__'"
: . {.:~\:': }.~..":~\ ·::(~;~~;-::~~.~5.::;i.~:~:?~\:.;;::.~
. .\~~~ ,~.._-_. "'''' '.,~ .....
.. i~2:[:![r.{~~~ii:;;;is~;;~;¡~~;;.\:::::~
H
'-"
·__..4
)
,
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MUL TI
LATERAL
(If API number
last two (2) digits
are between 60-69)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as·
a function ·of the. original API number stated
above.
HOLE In accordance with 20 AAC 25.005(t), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07110/02
Ojody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Companv Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
/'1/0
WELL PERMIT CHECKLIST COMPANY (i/l X WELL NAME ~/.J - / ~ PROGRAM: Exp _ Dev.25 Redrll _ Re-Enter _ Serv _ Wellbore seg _
FIELD & POOL Ç2$/4 c:? INIT CLASS .IJ~/__ / -¿!7J 7 GEOl AREA 9¡0 UNIT# //.3 <- <2' ON/OFF SHOREQ¿)
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . ,({\ N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. . . . . . . . . . . . . . . . . Y\I
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y \I
5. Well located proper distance from drilling unit boundary. Y "
6. Well located proper distance from other wells.. . . . . . . . . Y"
APPR D:?¡ 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y ~
ø/ /] 3 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y "
ßL,L .Þ': 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . \ yJ N
(Service Well Only) 13. Well located w/in area & strata authorized by injection order #_ xX ,If./. A
(Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . .. ,¿ N
ENGINEERING 15. Conductor string provided. . . . . . . . . .. ...... (þN
16. Surface casing protects all known USDWs. . . . . . . N
17. CMT vol adequate to circulate on conductor & surf csg. N
18. CMT vol adequate to tie-in long string to surf csg. . . . ff fL /
19. CMT will cover all known productive horizons. . . . . . .. N S/o #( (j
20. Casing designs adequate for C! T, B & permafrost. . . . . . . ..) N D ' I
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 'N ØVlliv'-- / ~ .
22. If a re-drill, has a 10-403 for abandonment been approved. . . N/J\"¡
23. Adequate wellbore separation proposed.. . . . . . . . . . . . N
24. If diverter required, does it meet regulations. " . . . . ... . N . 0
25, Drilling fluid program schematic & equip list adequate. . . . . N fJ1./i,-ý P'l/JJ -{, 3 P PC¡ .
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N
27. BOPE press rating appropriate; test to 4000 psig. N
28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . . N
29. Work will occur without operation shutdown. . . . . . . . . . ./.N
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y <hi)
31. Mechanical condition of wells within AOR verified. . . . . . . . --¥--N""At/A--
~~
Y N
Y N
Y N
APPR
DATE
\lJGA- 7-/~/O~
(Service Well Only)
GEOLOGY
APPR DATE
R#:' ~(V
" (É~ploratory Only)
(
32. Permit can be issued wlo hydrogen sulfide measures. . . . .
33. Data presented on potential overpressure zones. . . . . . . .
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . .
35. Seabed condition survey (if off-shore). . . . . . ~ ......
36. Contact namelphone for weekly progress reports. ......
{
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER COMMISSIONER: Commentsllnstructions:
RP~ TEM JDH JBR COT
DTS àe¡0i- DJ
WGA /
MJW MLB ð :2I/o.s-/Õ3
Rev: 10/15/02 SFD_
G:\geology\permits\checklist.doc
)
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
sim,plify finding information. information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
,,(
')
)
~ ð3-0d3
I / (pt! g
"
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Fri Apr 11 16:08:24 2003
Reel Header
Service name............ .LISTPE
Date.. . .. . . . . . . '.' . . . . . . .03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-12 PB1
500292313970
B.P. Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
11-APR-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW2309935000
J. STRAHAN
D. FERGUSON
MWD RUN 2
MW2309935000
J. STRAHAN
D. FERGUSON
MWD RUN 3
MW2309935000
J. STRAHAN
D. FERGUSON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3334
93
.00
72.60
38.70
#
WELL CASING RECORD
1ST STRING
2ND STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
13.500 20.000 112.0
9.875 10.750 2240.0
)
')
3RD STRING
PRODUCTION STRING
6.125
7.625
5779.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY
(GM) UTILIZING
GEIGER-MUELLER TUBE DETECTORS.
4. MWD RUNS 2 AND 3 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). MWD RUN 3 ALSO INCLUDED
AT-BIT-INCLINATION
(ABI) .
5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 4/10/03. MWD DATA
ARE CONSIDERED
PDC.
6. MWD RUNS I, 2, AND 3 REPRESENT WELL MPS-12 PB1 WITH
API#: 50-029-
23139-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF
8727IMD/4226'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
STOP DEPTH
) ")
GR 39.0 8673.5
Rap 113.5 8727.0
FET 2230.5 8680.5
RPD 2230.5 8680.5
RPM 2230.5 8680.5
RPS 2230.5 8680.5
RPX 2230.5 8680.5
$
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
3
MERGED MAIN PASS.
$
MERGE TOP
39.0
2250.5
5789.0
MERGE BASE
2250.5
5789.0
8727.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units......... ..Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . - 999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Min
39
0.79
11.74
1.07
1.43
0.6
1.6
0.06
Max
8727
1775.17
145.47
2000
2000
2000
2000
45.26
Mean
4383
283.63
72.3011
21.2395
24.0248
35.4459
36.3786
0.86803
Nsam
17377
17228
17270
12901
12901
12901
12901
12901
First Reading For Entire File......... .39
Last Reading For Entire File.......... .8727
First
Reading
39
113.5
39
2230.5
2230.5
2230.5
2230.5
2230.5
Last
Reading
8727
8727
8673.5
8680.5
8680.5
8680.5
8680.5
8680.5
.'
)
")
File Trailer
Service name... ......... .STSLIB.OOl
service Sub Level Name...
Version Number.... ...... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name........ .... .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type.............. . .LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
39.0
113.5
STOP DEPTH
2178.5
2250.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
27-FEB-03
Insite
4.3
Memory
2250.0
112.0
2250.0
.1
1.3
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
TOOL NUMBER
72829
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13.500
112.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
Spud Mud
9.30
143.0
8.5
600
)
)
9.6
.000 .0
.000 77.0
.000 .0
.000 .0
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD010
GR MWD010
units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 39 2250.5 1144.75 4424 39 2250.5
ROP MWD010 FT/H 25.9 1534.42 277.216 4275 113.5 2250.5
GR MWDOI0 API 16.85 145.47 71.0343 4280 39 2178.5
First Reading For Entire File......... .39
Last Reading For Entire File.......... .2250.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation... ....03/04/11
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name........... ..STSLIB.003
Service Sub Level Name. . .
Version Number.......... .1.0.0
)
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPX
RPS
ROP
$
3
)
header data for each bit run in separate files.
2
.5000
START DEPTH
2179.0
2230.5
2230.5
2230.5
2230.5
2230.5
2251.0
STOP DEPTH
5751.0
5743.5
5743.5
5743.5
5743.5
5743.5
5789.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
02-MAR-03
Insite
66.37
Memory
5789.0
2250.0
5789.0
.1
80.9
TOOL NUMBER
124724
103792
9.875
2240.0
LSND
9.30
82.0
8.5
400
6.0
3.500
2.550
4.700
3.500
72.0
101.2
72.0
72.0
)
)
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format specification Record
Data Record Type................ ..0
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 2179 5789 3984 7221 2179 5789
ROP MWD020 FT/H 8.28 1775.17 338.687 7077 2251 5789
GR MWD020 API 11.74 124.12 69.0974 7145 2179 5751
RPX MWD020 OHMM 1.64 1001.97 21.2601 7027 2230.5 5743.5
RPS MWD020 OHMM 1.43 2000 24.138 7027 2230.5 5743.5
RPM MWD020 OHMM 1.45 2000 28.7458 7027 2230.5 5743.5
RPD MWD020 OHMM 1.6 2000 29.6017 7027 2230.5 5743.5
FET MWD020 HOUR 0.06 39.87 0.644719 7027 2230.5 5743.5
First Reading For Entire File......... .2179
Last Reading For Entire File......... ..5789
File Trailer
Service name... ......... .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type......... . . . . . . .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
')
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
4
)
header data for each bit run in separate files.
3
.5000
START DEPTH
5744.0
5744.0
5744.0
5744.0
5744.0
5751.5
5789.5
STOP DEPTH
8680.5
8680.5
8680.5
8680.5
8680.5
8673.5
8727.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB!G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
05-MAR-03
Insite
66.37
Memory
8727.0
5789.0
8727.0
82.6
97.0
TOOL NUMBER
62456
73634
6.125
5779.0
FLO PRO
9.20
51.0
9.5
24000
4.2
.220
.160
.180
.260
68.0
93.0
71.0
73.0
)
)
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5744 8727 7235.5 5967 5744 8727
ROP MWD030 FT/H 0.79 601.18 221.988 5876 5789.5 8727
GR MWD030 API 33.07 132.36 77.1449 5845 5751.5 8673.5
RPX MWD030 OHMM 1.07 2000 21.2148 5874 5744 8680.5
RPS MWD030 OHMM 3.01 2000 23.8893 5874 5744 8680.5
RPM MWD030 OHMM 0.6 2000 43.4612 5874 5744 8680.5
RPD MWD030 OHMM 2.76 2000 44.4858 5874 5744 8680.5
FET MWD030 HOUR 0.13 45.26 1.13518 5874 5744 8680.5
First Reading For Entire File......... .5744
Last Reading For Entire File.......... .8727
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number... ....... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name.......... . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
) )
Next Tape Name.......... . UNKNOWN
Comments... ............ ..STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name........... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name......... ..UNKNOWN
Comments........ ....... ..STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
')
)
a03-œ3
t l f.DtJ7
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Fri Apr 11 14:08:31 2003
Reel Header
Service name... . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/04/11
origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-12
500292313900
B.P. Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
11-APR-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW2309935000
J. STRAHAN
D. FERGUSON
MWD RUN 2
MW2309935000
J. STRAHAN
D. FERGUSON
MWD RUN 3
MW2309935000
J. STRAHAN
D. FERGUSON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW2309935000
J. STRAHAN
D. FERGUSON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
6
12N
10E
3334
93
72.60
38.70
)
)
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
13.500
9.875
6.125
CASING
SIZE (IN)
20.000
10.750
7.625
DRILLERS
DEPTH (FT)
112.0
2240.0
5779.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. THIS WELL WAS EFFECTED BY MEANS OF AN OPEN-HOLE
SIDETRACK IN THE
MPS-12 PB1 WELLBORE, AT ABOUT 8066'MD/4264'TVD. THIS
SIDETRACK WAS
DRILLED DUE TO GEOLOGIC UNCERTAINTIES IN THE
ORIGINAL WELL.
4. MWD RUN 1 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY
(GM) , UTILIZING
GEIGER-MUELLER TUBE DETECTORS.
5. MWD RUNS 2 - 4 COMPRISED DIRECTIONAL WITH DUAL GAMMA
RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). MWD RUNS 3 AND 4 ALSO
INCLUDED AT-BIT-
INCLINATION (ABI).
6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 4/10/03. MWD DATA
ARE CONSIDERED
PDC.
7. MWD RUNS 1 - 4 REPRESENT WELL MPS-12 WITH API#:
50-029-23139-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
8460'MD/4298'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
)
')
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
39.0
113.5
2230.5
2230.5
2230.5
2230.5
2230.5
STOP DEPTH
8405.5
8460.0
8413.0
8413.0
8413.0
8413.0
8413.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
3
4
MERGED MAIN PASS.
$
MERGE TOP
39.0
2250.5
5789.0
8066.5
MERGE BASE
2250.5
5789.0
8066.0
8460.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . - 999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
Name Service Unit
Min
Max
First
Reading
Last
Reading
Mean Nsam
) )
DEPT FT 39 8460 4249.5 16843 39 8460
ROP MWD FT/H 8.28 1775.17 288.834 16694 113.5 8460
GR MWD API 11.74 145.47 70.3847 16734 39 8405.5
RPX MWD OHMM 1.07 2000 22.5939 12366 2230.5 8413
RPS MWD OHMM 1.43 2000 25.5799 12366 2230.5 8413
RPM MWD OHMM 0.6 2000 37.3595 12366 2230.5 8413
RPD MWD OHMM 1.6 2000 38.2661 12366 2230.5 8413
FET MWD HOUR 0.06 45.26 0.8755 12366 2230.5 8413
First Reading For Entire File......... .39
Last Reading For Entire File.......... .8460
File Trailer
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name........... ..STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
39.0
113.5
STOP DEPTH
2178.5
2250.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
27-FEB-03
Insite
4.3
Memory
2250.0
112.0
2250.0
.1
1.3
#
TOOL STRING (TOP TO BOTTOM)
')
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type................ ..0
Data Specification Block Type... ..0
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD010
GR MWD010
TOOL NUMBER
72829
13.500
112.0
Spud Mud
9.30
143.0
8.5
600
9.6
.000
.000
.000
.000
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
)
.0
77.0
.0
.0
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 39 2250.5 1144.75 4424 39 2250.5
ROP MWD010 FT/H 25.9 1534.42 277.216 4275 113.5 2250.5
GR MWD010 API 16.85 145.47 71.0343 4280 39 2178.5
First Reading For Entire File......... .39
Last Reading For Entire File.......... .2250.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name.. .
)
version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type................ LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPM
RPD
RPS
RPX
FET
ROP
$
3
)
header data for each bit run in separate files.
2
.5000
START DEPTH
2179.0
2230.5
2230.5
2230.5
2230.5
2230.5
2251.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
5751.0
5743.5
5743.5
5743.5
5743.5
5743.5
5789.0
02-MAR-03
Insite
66.37
Memory
5789.0
2250.0
5789.0
.1
80.9
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
TOOL NUMBER
124724
103792
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
9.875
2240.0
LSND
9.30
)
')
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
82.0
8.5
400
6.0
3.500
2.550
4.700
3.500
72.0
101.2
72.0
72.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . .Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2179 5789 3984 7221 2179 5789
ROP MWD020 FT/H 8.28 1775.17 338.687 7077 2251 5789
GR MWD020 API 11.74 124.12 69.0974 7145 2179 5751
RPX MWD020 OHMM 1.64 1001.97 21.2601 7027 2230.5 5743.5
RPS MWD020 OHMM 1.43 2000 24.138 7027 2230.5 5743.5
RPM MWD020 OHMM 1.45 2000 28.7458 7027 2230.5 5743.5
RPD MWD020 OHMM 1.6 2000 29.6017 7027 2230.5 5743.5
FET MWD020 HOUR 0.06 39.87 0.644719 7027 2230.5 5743.5
First Reading For Entire File......... .2179
Last Reading For Entire File.......... .5789
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name. . .
Version Number.......... .1.0.0
')
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number... ....... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record..65535
File Type................ LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
4
)
header data for each bit run in separate files.
3
.5000
START DEPTH
5744.0
5744.0
5744.0
5744.0
5744.0
5751.5
5789.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
8066.0
8066.0
8066.0
8066.0
8066.0
8066.0
8066.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
05-MAR-03
Insite
66.37
Memory
8066.0
5789.0
8066.0
82.6
97.0
TOOL NUMBER
62456
73634
6.125
5779.0
FLO PRO
9.20
51.0
')
)
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
9.5
24000
4.2
.220
.160
.180
.260
68.0
93.0
71.0
73.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5744 8066 6905 4645 5744 8066
ROP MWD030 FT/H 16.01 601.18 233.359 4554 5789.5 8066
GR MWD030 API 33.07 101.76 71.0817 4630 5751.5 8066
RPX MWD030 OHMM 1.07 2000 24.3837 4645 5744 8066
RPS MWD030 OHMM 3.86 2000 27.4778 4645 5744 8066
RPM MWD030 OHMM 0.6 2000 51.8037 4645 5744 8066
RPD MWD030 OHMM 2.76 2000 52.4882 4645 5744 8066
FET MWD030 HOUR 0.13 45.26 1.28655 4645 5744 8066
First Reading For Entire File......... .5744
Last Reading For Entire File.......... .8066
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
)
Maximum Physical Record. .65535
File Type.... . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name. .......... ..STSLIB.005
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type.... . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
GR
ROP
FET
$
5
)
header data for each bit run in separate files.
4
.5000
START DEPTH
8066.5
8066.5
8066.5
8066.5
8066.5
8066.5
8066.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
8413.0
8413.0
8413.0
8413.0
8405.5
8460.0
8413.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
05-MAR-03
Insite
66.37
Memory
8460.0
8066.0
8460.0
83.6
87.0
TOOL NUMBER
62456
73634
6.125
5779.0
FLO PRO
9.20
54.0
9.0
')
)
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
22000
4.0
.220
.180
.170
.310
73.0
93.0
72.0
69.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ..............0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record........... ..Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8066.5 8460 8263.25 788 8066.5 8460
ROP MWD040 FT/H 17.77 483.44 224.748 788 8066.5 8460
GR MWD040 API 42.11 129.49 75.0827 679 8066.5 8405.5
RPX MWD040 OHMM 4.29 70.88 24.12 694 8066.5 8413
RPS MWD040 OHMM 4.56 62.02 27.4762 694 8066.5 8413
RPM MWD040 OHMM 4.68 69.47 27.9001 694 8066.5 8413
RPD MWD040 OHMM 5.08 80.54 30.8062 694 8066.5 8413
FET MWD040 HOUR 0.16 10.38 0.461037 694 8066.5 8413
First Reading For Entire File......... .8066.5
Last Reading For Entire File.......... .8460
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
I .
')
)
File Type................LO
Next File Name.......... .STSLIB.006
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date.................... .03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number. .... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File