Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-024
) )
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~ ro. - O:l ~ Well History File Identifier
Organizing (done)
o Two-sided 1111111111111111111
o R escan Needed
r
~
RESCAN
DIGITAL DATA
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
D Color Items:
o Greyscale Items:
D Diskettes, No.
D Other, NolType:
D Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
D Logs of various kinds:
Scanning Preparation
BY: Helen ~
I
x 30 = 30
o Other:: r
Date: if' J.f1j os- 151 Yt1:.o
1-
,"AD
Date: tf J-C¡ o.s- 151 r r t
'f I
+ d d- = TOTAL PAGES 6,~
(Count doe"s not ir~lude cover sheet) ...A JI {]
Date: if ~r 6Sìsl (Vir
, ' I
NOTES:
BY:
Helen ~
Project Proofing
BY:
Helen CMaria 2,
Production Scanning
Page Count Matches Number in Scanning Preparation:
'--- r:; C (Count does include cover sheet)
VYES
? ,
Date:'f J.fj o..s- /5/
, .
YES NO
NO
mP
Stage 1
Page Count from Scanned File:
BY:
Helen (Maria "),
Stage 1
BY:
If NO in stage 1 page( s) discrepancies were found:
Helen Maria
Date:
/5/
III I
Scanning is complete at this point unless rescanning is required.
ReScanned
""11"111
BY:
Helen Maria
Date:
/51
Comments about this file:
Quality Checked
111II1I111111111111
•
--~_
~:~:_
MICROFILMED
03/01/2008
DO NOT P LAC E
:;... ,
~, .
~...
_ w"',
~.*
~.~.
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\C~rPgs_Inserts\A~ticrofilm Marker.doc
.
.
~~
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Cornrn.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 13, 2006
RE: MWD Formation Evaluation Logs: MPK-09, MPS-12_PB1_Ll, MPI-13, MPS-18_PBl.
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
MPK-09: é)D~- 01'-/ -tf: ¡"/3c;?f
Digital Log Images: 1 CD Rom
50-029- 23247 -00
MPS-12 PBl Ll: Q6""3 -og"3 Ù /4401 903 -08.Lf ìi ILf'/Dd.
- - (
Digital Log Images: 1 CD Rom
50-029-23133-00, 70, 60
MPI-13: U:r.~ Got -ö-=t~ I±IL{c3C]~
Digital Log Images: 1 CD Rom
50-029-23012-00
MPS-18_PB1: UTe... gOd -8<..[;] tt ¡'-¡'-iDO
Digital Log Images:
50-029-23133-00, 70
1 CD Rom
SCANNED FEB 0 1 2007
lo
e
e
WELL LOG TRANSMIITAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
December 03,2003
!3i.ß 14-
RE: MWD Formation Evaluation Logs: MPS-12 LI,
AK-MW-2309935
MPS-12 Ll:
Digital Log Images:
50-029-23139-60
!3D?>~WV
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
/l Date ~~(g
S¡gneðé; £Dmttt)
Permit to Drill 2030240
MD
8150 ~
------ --- -- -~ ..------.----
-~ - -------
REQUIRED INFORMATION
Iw·
~
I
I~
~
L__
~
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored? ~
Chips Received? y- / N
Analysis 'Y / t-J
Received?
--_.--
Comments:
------------
--- -.-- ~-._~---
Compliance Reviewed By:
I 3 ~1 ~~~~r-
DATA SUBMITTAL COMPLIANCE REPORT
4/1/2005
Well Name/No. MILNE PT UNIT SB S-12L 1
Operator BP EXPLORATION (ALASKA) INC
TVD 4272./
Completion Date 3/13/2003 /' Completion Status
1-01L
Current Status 1-01L
UIC N
Mud Log No
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, ASI, IFR/CASANDRA
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number
Jp¿ 7~ÁtHJJ
API No. 50-029-23139-60-00
Directional Survey_ ~
(data taken from Logs Portion of Master Well Data Maint)
Name
Log Log
Scale Media
Interval
Start Stop
Run
No
Directional Survey
LIS Verification
LIS Verification
Directional Survey
5257 8150 Open
39 8096 Open
39 8096 Open
5257 8150 Open
Interval
Start Stop
Sample
Set
Number Comments
Sent
Received
Daily History Received?
dIN
~N
Formation Tops
iJo
OH/
CH
----
Received Comments
A Directional Survey Log is
required to be submitted.
This record automatically
created from Permit to Drill
Module on: 2/6/2003.
4/22/2003
4/29/2003
4/29/2003
4/22/2003 MWD
. --<
Date:
J Lf fi-p )$-ò \-
j
)
.~
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation CamIno
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
i\nchorage,Alaska 99501
April 18,2003
RE: MWD Formation Evaluation Logs J\1PS-12 Ll,
AK-MW-23 09935
1 LIS forrnatted Disc with verification listing.
API#: 50-029-23139-60
Q08-0dY
II (c;A.j4
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
s¡gn4 ,~.Úa0r-/
~~Cs¡ "
~ 4p/( lV~D
~8rb <9 "
vr¡ «6 ~~. <OOJ
~~ ~~: Ca
~e 'IJ
")
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
IS! Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska
4. Location of well at surface
3334' NSL, 93' WEL, SEC. 12, T12N, R10E/ UM
At top of productive interval ,
4658' NSL, 3240' WEL, SEC. 07, T12N; R11E, UM X = 567534, Y = 6001342 10. Well Number
At total depth
2131' NSL, 2997' WEL, SEC. 06, T12N, R11E,UM X = 567741, Y = 6004096
11. Field and Pool
5. Elevation in feet (indicate KB, OF, etc.); 6. Lease Designation and Serial No. Milne Point Unit / Schrader Bluff
KBE = 72.6' ADL 380110
Classification of Service Well
~ 7. Permit Number
¡ Üf;.n: ~ 203-024
~,.3.:-J3?=1 8. API Number
99519-6612 '; '~2~} ~ 50- 029-23139-60
~""~:O<"."""'''.''''''''''''''_) 9. Unit or Lease Name
X = 565917, Y = 6000002 Milne Point Unit
MPS-12L 1
12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband.
3-7 -2003 3-9-2003 3-13-2003
i 7. Total Depth (MD+ TVD) 18. Plug Back D~pth (MD+ TVD) 19. Directional Survey
8150 4272 FT 8150 4272 FT ISI Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, RES, ABI, IFR/CASANDRA
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1800' (Approx.)
"'17IJ~'f.,?u >" 2,/0",11 /.)
'1;/ /"3 "'¡-Vl:>
23.
CASING
SIZE
20"
1 0-314"
7-5/8"
4-1/2"
WT. PER FT.
92#
45.5#
29.7#
12.7#
GRADE
H-40
L-80
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
Surface 112' 42"
35' 2241' 13-1/2"
33' 5270' 9-7/8"
5248' 8103' 6-1/8"
CEMENTING RECORD
260 sx Arctic Set (Approx.)
566 sx Class 'L', 220 sx Class 'G'
125 sx Class 'L', 392 sx Class 'G'
Uncemented Slotted Liner
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/2" Slotted Liner
MD TVD
MD
TVD
25. TUSING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2", 12.6#, L-80 5069'
3-1/2",9.2#, L-80 5069' - 5136' 5082'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
1800' Freeze Protected with 80 Bbls of Diesel
5335' - 8056' 4124' - 4236'
27.
Date First Production
March 17, 2003
Date of Test Hours Tested
3/23/2003 6
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-BsL
TEST PERIOD 2716
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28. CORE DATA n.r-f"[IVCO
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit ccte'\:.-v
Oll-Bsl
GAs-McF
874
GAs-McF
WATER-Bsl
o
CHOKE SIZE
GAS-OIL RATIO
322
WATER-Bsl
OIL GRAVITY-API (CORR)
RBDMS BFL
APR 3 0 1003
APR 1 8 2003
Alaska Oil & Gas Cons. Commission
Anchorage
No core samples were taken.
Form 10-407 Rev. 07-01-80
ORIG\NAL
Submit In Duplicate
)
29. ',I I
Geologic Markers
Marker Name Meqsured True Vertical
Depth Depth
aF2~NA 47901 3955'
SBF21 48011 39601
Schrader Bluff NA Sand 4838' 3976'
SBF1-NB 4850' 3981'
SBF1-NBR 48591 3984'
SBD4-NC ~l~271 !' 40131
SBE41 49391 40181
SBD2-NE 4967' 4029'
, !I
SBE1-NF 51341 40831
TSBD-OA 5~O41 41201
)
30.
Formation Tests
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
RECEIVED
APR 1 8 2003
Alaska 01\ & Gas Cons. Commission
Anchorage
31. List of Attachments:
~ :"~'~I~,~'I :,~:'~""~I'~
\ ":1: I-
Summary of Daily Drilling Reports, Survey and a Leak-Off Integrity Test Summary.
\' ,"" 'f
32. I hereby certify that the foregoihg is true: and: correct to the best of my knowledge
. Signed ~~ Title Technical Assistant Date C>'i-ILD-D~
MPS-12L 1 203-024 Prepared By Name/Number: Sandra Stewman, 564-4750
Well Number Permit No. I Approval No. Drilling Engineer: Steve Campbell, 564-4401
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not othelWìse shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IrEM 28: If no cores taken, indicate 'none'.
ITEM 27: Method of Operation: Flowing, Gas lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
Form 10~407 Rev. 07-01-80
OR\G ~A~
""'\'¡
')
)
BP EXPLORATION Page 1 of?
Operations 'Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
2/26/2003
2/27/2003
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
From - To Hours Task Code NPT Phase
10:00 - 15:00 5.00 MOB P PRE
15:00 - 16:30 1.50 RIGU P PRE
16:30 - 19:00 2.50 RIGU P PRE
19:00 - 21 :30 2.50 DRILL P SURF
21 :30 - 22:00 0.50 DRILL P SURF
22:00 - 22:30 0.50 DRILL P SURF
22:30 - 23:00 0.50 RIGU P PRE
23:00 - 00:00 1.00 DRILL P SURF
00:00 - 00:30 0.50 DRILL P SURF
00:30 - 02:00 1.50 DRILL P SURF
02:00 - 20:00 18.00 DRILL P SURF
20:00 - 21 :00 1.00 CASE P SURF
21 :00 - 22:30 1.50 CASE P SURF
22:30 - 23:00 0.50 CASE P SURF
23:00 - 00:00 1.00 CASE P SURF
2/28/2003 00:00 - 01 :30 1.50 CASE P SURF
01 :30 - 02:00 0.50 CASE P SURF
02:00 - 03:30 1.50 CASE P SURF
03:30 - 06:30 3.00 CASE P SURF
06:30 - 07:00 0.50 CEMT P SURF
07:00 - 07:30 0.50 CEMT P SURF
07:30 - 11 :00 3.50 CEMT P SURF
11 :00 - 13:30 2.50 CEMT P SURF
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Description of Operations
Rig Down, Move Off MPS-18 & Move Rig to MPS-12. Spot Rig
over Conductor. Skid Rig Floor.
RIG ACCEPTED @ 15:00 hRS 2/26/2003.
Fill Pits wI Mud & Water. RIU Rig Floor.
NIU Diverter & Lines, Spot Tiger Tank, Rockwasher, Sperry
Shack. Load Mud Bay.
Pick Up & M/U BHA. CIO Stab. Sleave, Install MWD
Electronics, Orient and adjust UBHO Sub
Pre Spud Meeting Held by Co. Rep wI All Drilling Hands on
Tour & all Service Co. Personnel.
R/U HES Slick Line Sheaves for Gyro Surveys.
Diverter Drill - Function Test. Witness waived by John Crisp,
AOGCC. Check for Leaks in riser & Flow Line.
CIO Conductor, Drill from 112' to 185'. 400 GPM @ 1000 psi.
50 RPM ART = 0.5 Hrs.
Drill from 185' to 276'.400 GPM @ 1030 psi.
Stand Back HWDP & P/U 6 ea. DC's.
Drill from 276' to 1600', 400 GPM @ 1800 psi.
1600' to 2250' 500 GPM @ 2700 psi. Torque = 8K
P/U = 110K SIO = 108K ROT = 110K. RPM = 110, Motor =
75
AST = 0.75 Hrs. ART = 9.0 Hrs.
Took 6 Gyro Surveys: Last @ 882'.
Circulate Hole Clean 500 GPM @ 2300 psi.& 110 RPM.
Wiper Trip to 760'. No Problems.
Circulate Hole Clean - 500 GPM @ 2250 psi. & 110 RPM
POH to BHA. No Drag - Hole in good shape.
Lay Down BHA
Clear Floor, P/U Landing Jt & Hanger - Make Dummy Run
PJSM with all Hands. RIU to run 10 3/4" Casing
Run 53 Jts, 45.5#, L-80, BTC Surface Casing.
P/U Hanger & Landing Jt. Land Casing. Shoe @ 2240'
Correct Displacement and filling pipe Throughout.
Circulate Bottoms up - 6 BPM @ 400 psi.wl Franks Tool
Reciprocate Pipe.
RID Franks Tool M/U Cement Head.
Circulate & Condition Mud for Cement Job. Cut Vis to 53 sec.
Cut YP to 9. Circ @ 6 BPM Final Pressure - 180 psi.
Turn over to Halliburton & Cement as Follows
Pumping @ 5 to 7 BPM:
Pump 5 Bbls Water
Test Lines to 3500 psi.
Pump 15 Bbls Water
Mix & Pump 50 Bbls ALPHA Spacer, weighted to 10.2 ppg.
Drop Bottom Plug
Mix & Pump 421 Bbls.(566 sx) PERMAFROST "L" Slurry @
10.7ppg.
Cement Returns to Surface:
Mix & Pump 47 Bbls. ( 230 sx), Class "G" Premium Slurry @
15.8 ppg. with 2% Calcium Chloride.
Drop Top Plug
Flush HOWCO Lines w/1 0 Bbls. water
Switch to Rig and Displace wi 208 BBls Mud @ 7 Bbls/Min.
Printed: 3/17/2003 8:52:53 AM
')
)
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
From- To Hours Task Code NPT Phase
Description of Operations
2/28/2003
11 :00 - 13:30
2.50 CEMT P
SURF
Reciprocating Casing Throughout Job.
Slowed down to 2 BPM for last 10 BBls. Final pressure 420 psi.
Bumped Plug wi 1420 psi. Check Floats - OK.
Est. Total 254 BBls Cement to Surface.
13:30 - 15:00 1.50 CEMT P SURF Lay down landing Jt. & Flush Stack
15:00 - 16:30 1.50 CASE P SURF N/D Diverter & Associated Equipment
16:30 - 17:00 0.50 CASE P SURF N/U FMC GEN-5 Casing I Tubing Heads. Test Metal to Metal
Seals to 1000 psi.
17:00 - 19:00 2.00 CASE P SURF N/U 13 5/8", 5000 psi BOPE.
19:00 - 19:30 0.50 BOPSUR P SURF RIU to Test BOPE.
19:30 - 00:00 4.50 BOPSURP SURF Test BOPE to 250 - 4000 psi. I Annular to 250 - 2500 psi.
Witness of Test waived by John Crisp - AOGCC.
3/1/2003 00:00 - 00:30 0.50 CASE P SURF Install 1 0" ID wear Bushing.
00:30 - 03:00 2.50 CASE P SURF P/U & M/U BHA. Motor with Bend of 1.5 Deg in bind going into
10 3/4" 45.5 # Casing. Re-Adjust Motor Bend from 1.5 Deg to
1.22 Deg. Tight, but OK. M/U & RIH wi rest of BHA.
03:00 - 03:30 0.50 CASE P SURF CIO Elevators to 4". P/U 1 Jt. DP & Function test MWD - OK.
03:30 - 04:30 1.00 CASE P SURF RIH to 2061' Picking up 4" DP from Shed.
04:30 - 05:30 1.00 CASE P SURF Slip & Cut Drilling Line. Service Top Drive.
05:30 - 06:30 1.00 CASE P SURF RIU & Test 10 3/4" Casing to 2500 psi. for 30 minutes.
06:30 - 07:30 1.00 CASE P SURF Drill Shoe Track to 2240'. Very Clabbered Mud.
07:30 - 09:30 2.00 CASE P SURF Circulate & Condition Mud.
09:30 - 10:00 0.50 CASE P SURF Clean out Rat Hole to 2250 and Drll 20' of new Hole to 2270'.
10:00 - 10:30 0.50 CASE P SURF CBU in preparation for FIT.
10:30 - 11 :30 1.00 CASE P SURF Perform FIT. Surface pressure of 270 psi. wi 9.2 ppg Mud =
an EMW of 11.52 ppg @ 2240 TVD.
11 :30 - 00:00 12.50 DRILL P INT1 Directional Drill 9 7/8" Hole from 2270' to 4169'.
@ 4169': 500 GPM @ 3300 psi. Torque = 9K RPM = 110
P/U = 115 K, SIO = 98K, ROT = 110K.
AST = 4.75 Hrs. ART = 2.92 Hrs.
3/2/2003 00:00 - 01 :00 1.00 DRILL P INT1 Circulate Bottoms Up to clean Hole @ 500 GPM & 110 RPM.
Pressure Dropped from 3300 psi to 3150 psi.
01 :00 - 18:00 17.00 DRILL P INT1 Directional Drill from 4169' to 5789'. 509 GPM @ 3420 psi.
P/U = 124K, SIO = 95K, ROT = 113K Torque = 6.5K, 110
RPM
AST = 8.5 Hrs. ART = 2.75 Hrs.
18:00 - 20:00 2.00 CASE P INT1 Circulate Lol Hi Vis. Sweep @ 509 GPM, Reciprocating Pipe
@ 110 RPM. ICP = 3200 psi. , FCP = 3040 psi.
20:00 - 23:00 3.00 CASE P INT1 Pump out of Hole to Shoe @ 2240'.509 GPM, ICP = 3040 psi.
FCP = 1620 psi.
23:00 - 00:00 1.00 CASE P INT1 RIH to 4650'. No obstuctions.
3/3/2003 00:00 - 00:30 0.50 CASE P INT1 RIH to 5789'.
00:30 - 02:00 1.50 CASE P INT1 CBU, Circulate Lo/Hi Vis Sweep. 509 GPM, Rotate @ 110
RPM, Reciprocate 90'. Pressure 3230 psi.
02:00 - 06:00 4.00 CASE P INT1 Pump out of Hole to Shoe @ 509 GPM.
06:00 - 06:30 0.50 CASE P INT1 CBU at Shoe @ 2240'. Good load of cuttings over shaker.
06:30 - 07:30 1.00 CASE P INT1 Pump Slug. POH to HWDP ( 724').
07:30 - 09:30 2.00 CASE P INT1 UD BHA.
09:30 - 11 :00 1.50 CASE P INT1 Pull Wear Bushing, Install Test Plug. CIO Top Rams to 7 5/8".
Test Bonnet Seals to 3500 psi.
11 :00 - 13:00 2.00 CASE P INT1 RIU to run 7 5/8" casing. Make dummy run wi Hgr & landing Jt.
Printed: 3/17/2003 8:52:53 AM
} )
BP EXPLORATION Page 3 of 7
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
3/312003 11 :00 - 13:00 2.00 CASE P INT1
13:00 - 15:30 2.50 CASE P INT1 Run 7 5/8" Casing as per program to Shoe @ 2240'.
15:30 - 16:00 0.50 CASE P INT1 CBU - 6 BPM @ 420 psi. P/U = 110K, S/O = 106K
16:00 - 20:00 4.00 CASE P INT1 Run total 140 Jts, 75/8",29.7#, L-80, BTC-M Casing to 5780'.
precautionarily Wash last Jt to bottom. No Fill - Hole Slick.
20:00 - 20:30 0.50 CASE P INT1 RID Franks Tool I R/U Cement Head.
20:30 - 23:00 2.50 CASE P INT1 C&C Mud @ 6 BPM start @ 350 psi. - down to 300 psi wI YP
at 14. P/U = 175K, S/O = 125K.
23:00 - 00:00 1.00 CEMT P INT1 Turn over to HOWCO and Cement as Follows:
Pump 5 Bbls Water
Test Lines to 3500 psi.
Mix & Pump 30 Bbls ALPHA spacer weighted @ 10.2 ppg.
Drop Bottom Plug
Mix & Pump 49 Bbls ( 125 sx) Permafrost "E" slurry @ 12.0
ppg., yield 2.17
Mix & Pump 85 Bbls. ( 392 sx) Premium slurry, @ 15.6 ppg.
yield 1.22 wI 3% KCL, 2% Cal-Seal, & 0.5% LAP-1.
Both sluuries pumped @ 5-6 BPM.
Drop Top Plug & chase w/1 0 Bbls water to clear HOWCO
lines.
Switch back to Rig & continue displacing wI 252 Bbls MUd @ 7
BPM. FCP 590 psi. Bumped Plug wi 1600 psi. Floats OK
100 % Returns Throughout Job
Reciprocated pipe Throughout Job. CIP - 00: 15 Hrs.
3/4/2003 00:00 - 00:30 0.50 CEMT P INT1 Displacing wI 252 Bbls mud @ 7 BPM. FCP 590 psi. Bumped
Plug wi 1600 psi. Floats OK
100 % Returns Throughout Job
Reciprocated pipe Throughout Job. CIP - 00: 15 Hrs.
00:30 - 01 :00 0.50 CEMT P INT1 Lay down cement head and landing jt.
01 :00 - 02:00 1.00 BOPSUR P INT1 Install 7 5/8 packoff assy. test to 5000 psi
02:00 - 03:30 1.50 BOPSUR P INT1 Change out top rams to 2 7/8 x 5" variables, test door seals to
4,000 psi
03:30 - 04:00 0.50 BOPSUR P INT1 Lay down test jt, install wear ring
04:00 - 06:00 2.00 CASE P INT1 Picking up BHA #3 , test MWD
06:00 - 09:30 3.50 CASE P INT1 Picking up 111 jts 4" pipe from pipe shed ,Trip in to 5,657'
09:30 - 10:30 1.00 CASE P INT1 Circ for csg test
10:30 - 11 :30 1.00 CASE P INT1 Test csg to 3,500 psi for 30 min. good test
11 :30 - 13:00 1.50 DRILL P PROD1 Drill cement float @ 5,697' and shoe @ 5,779',20 ft of new
hole to 5,809'
13:00 - 14:00 1.00 DRILL P PROD1 Circ and FIT test MW 9.3, 400 psi, 4207 TVD, =11.0 EMW
14:00 - 00:00 10.00 DRILL P PROD1 Drilling 5809' to 6902' with 240 gals min, 1850 psi, 80 rpms, 4-5
K bit wt., AST 1.5 ART 5.25, TO. 4K P/U 120K S/O 75K RfT
100K
3/5/2003 00:00 - 11 :00 11.00 DRILL P PROD1 Drilling 6902' to 8200' with 240 gals min, 2,000 psi, 80 rpms
11:00 -11:30 0.50 DRILL P PROD1 Circ, while Geologist consults town
11 :30 - 17:30 6.00 DRILL P PROD1 Drilling 8200' to 8,727' with 240 gals min, 2,000 psi, 80 rpms
drill out top of sand @ 8,160, drill to 8,727 no sand built to 97
degrees AST 3.25 ART 6.75
17:30 - 18:00 0.50 DRILL P PROD1 Circ
18:00 - 19:00 1.00 DRILL P PROD1 Pump out to 8054 to side track well
19:00 - 20:00 1.00 DRILL P PROD1 Side tracking well @ 8066 to 8,101 low side well
20:00 - 23:30 3.50 DRILL P PROD1 Drilling 8,101' to 8,460' TD with 240 gals min, 2,000 psi, 80
rpms, Cross Fault 8,380' ART 1.25, AST 1 TO 6K P/U 122K
Printed: 3/17/2003 8:52:53 AM
')
)
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
3/5/2003 20:00 - 23:30 3.50 DRILL P PROD1 S/O 55k R/T 1 OOk
23:30 - 00:00 0.50 DRILL P PROD1 Circ, with 240 gals min. 2,000 psi 100 rpms well started taking
mud @ 50 bbls hr. slowed pumps to 200 gals min. 1500 psi
well taking 25 to 30 bbls hr. lost total 25 bbls
3/6/2003 00:00 - 02:00 2.00 CASE P COMP Circ, with 240 gals min. 2000 psi 100 rpms well started taking
mud @ 50 bbls hr. slowed pumps to 200 gals min. 1500 psi
well taking 25 to 30 bbls hr., circ 2.5 bottoms up
02:00 - 05:00 3.00 CASE P COMP Pumping out of hole to shoe 5779, with 200 gals min 1500 psi
spotting 40 bbl CaC03 with 35 ppb mud wt 9.5 in open hole
while pumping to shoe. Total overall lost to well 1 00 bbls
05:00 - 05:30 0.50 CASE P COMP Monitor well, static
05:30 - 06:30 1.00 CASE P COMP Circ, bottoms up, no losses
06:30 - 07:30 1.00 CASE P COMP Cut drilling line
07:30 - 10:00 2.50 CASE P COMP Drop rabbit, POH
10:00 - 11 :00 1.00 CASE P COMP Stand back flex dC.,lay down MWD, Mud motor
11 :00 - 14:00 3.00 CASE P COMP Pick up slotted liner, 4.5 12.6# L-80 IBT, total of 5 solid jts and
60 slotted, 2 solid jts, baker 5.5 HMC liner hanger, Baker 5.5 x
7 5/8 ZXP liner top packer
14:00 - 15:30 1.50 CASE P COMP Trip in with liner to 5,779
15:30 - 16:00 0.50 CASE P COMP Circ drill pipe Volume, get P/U and S/O wts
16:00 -17:30 1.50 CASE P COMP Trip in with liner to 8,460' no problems
17:30 - 18:00 0.50 CASE P COMP Drop ball, circ, set liner hanger, packer and release liner, top of
liner 5,677'
18:00 - 20:00 2.00 CASE P COMP Tripping out with liner setting tools, lay down same
20:00 - 00:00 4.00 CASE P COMP Pull wear ring, Testing BOPS and manifold 250-4,000 psi
Annular 250-2500 psi, Witness of test was waiver by John
Spaulding AOGCC, one repair of valve # 14 had to be changed
out
3/7/2003 00:00 - 01 :30 1.50 CASE P COMP Testing BOP and manifold 250-4,000 psi Annular 250-2500 psi.
Witness of test was waiver by John Spaulding AOGCC.
Repair valve # 14, change out same. Install wear ring.
01 :30 - 05:30 4.00 STWHIP P PROD2 Picking up space out tail pipe and Whipstock and mills, MWD
and 4 3/4" drill collars.
05:30 - 06:00 0.50 STWHIP P PROD2 Surface test MWD.
06:00 - 10:00 4.00 STWHIP P PROD2 Tripping in with Whipstock at 2 min. per stand, fill pipe every 10
stands.
10:00 - 10:30 0.50 STWHIP P PROD2 Orient Whipstock, set trip anchor with 18K down, set down,
shear Whipstock pin.
10:30 - 15:30 5.00 STWHIP P PROD2 Milling window. Top of window at 5,270', bottom window
5,282', total depth 5,299', "OA" sand top 5,279'.
15:30 - 17:00 1.50 STWHIP P PROD2 Circulate, work 6 3/4" mills across window, pump sweeps.
17:00 - 19:30 2.50 STWHIP P PROD2 Tripping out with mills and lay down same
19:30 - 21 :30 2.00 DRILL P PROD2 Pick up BOP jet washer tool and super magnet, flush BOP.
21 :30 - 23:00 1.50 DRILL P PROD2 Pick up BHA #5, surface test MWD.
23:00 - 00:00 1.00 DRILL P PROD2 Tripping in with BHA #5
3/8/2003 00:00 - 01 :00 1.00 DRILL P PROD2 Tripping in with BHA #5 to window @ 5,270
01 :00 - 01 :30 0.50 DRILL P PROD2 Orient bit and slide thru window, no problems
01 :30 - 00:00 22.50 DRILL P PROD2 Drilling 5,299' to 8,056' with 240 gall min 2100 psi, 4-5k bit wt,
80 rpm.,TQ 5,500 AST 5, ART 7, 100 % sand
3/9/2003 00:00 - 00:30 0.50 DRILL P PROD2 Drilling 8,056' to 8,150 TD with 240 gall min 2100 psi, 4-5k bit
wt, 80 rpm.
00:30 - 02:30 2.00 CASE P COMP Circ. Three bottoms up with 240 gals min. 2100 psi 100 rpms
02:30 - 05:30 3.00 CASE P COMP Pumping out to window with full drilling rate, pull across window
Printed: 3/17/2003 8:52:53 AM
)
')
BP
Operations Summary Report
Legal Well Name: MPS-12
Common Well Name: M PS-12 Spud Date: 2/26/2003
Event Name: DRILL +COMPLETE Start: 2/26/2003 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 3/13/2003
Rig Name: DOYON 14 Rig Number:
From ";To Hours Task Code NPT Phase Description of Operations
3/9/2003 02:30 - 05:30 3.00 CASE P COMP with out pumping
05:30 - 06:30 1.00 CASE P COMP Circ. bottoms up @ 5211' 250 gals min.
06:30 - 08:30 2.00 CASE P COMP Tripping out
08:30 - 10:30 2.00 CASE P COMP Laying down BHA
10:30 - 12:00 1.50 CASE P COMP Picking up Whipstock Retrieval BHA
12:00 - 13:30 1.50 CASE P COMP Tripping in to 5,200'
13:30 - 17:00 3.50 CASE P COMP Orientate MWD, attempt to hook Whipstock. Made several
attempts, wash slot on slide, orient 360 deg make several
attempts with no success.
17:00 - 19:00 2.00 CASE N DFAL COMP POH
19:00 - 22:00 3.00 CASE N DFAL COMP Trip out with BHA. Did not recover Whipstock, lay down MWD,
1 jt 3.5 hw., Whipstock hook.
22:00 - 23:30 1.50 CASE P COMP Slip and cut drill line, service top drive
23:30 - 00:00 0.50 CASE N DFAL COMP Change Whipstock retrieval BHA, picked up new hook with
bend and change out 3 .5 HW jt to plain 3.5 jt.
3/10/2003 00:00 - 02:30 2.50 CASE N DFAL COMP Tripping in with new Whipstock hook BHA.
02:30 - 03:30 1.00 CASE N DFAL COMP Circ and Orient Whipstock hook, pump 10 bbls H20, wash
Whipstock key way, latch Whipstock, jarred twice with 50,000
Ib overpull, came free. Gain 12,000 lb. string wt.
03:30 - 04:00 0.50 CASE N DFAL COMP Circ bottoms up.
04:00 - 07:30 3.50 CASE P COMP POH with Whipstock
07:30 - 11 :00 3.50 CASE P COMP Laying down whipstock, and tain pipe space out.
11 :00 - 11 :30 0.50 CASE P COMP PJSM, rig to run 4.5 liner
11 :30 - 15:00 3.50 CASE P COMP Picking up 4.5 liner 68 jts.12.6# L-80 IBT slotted and Baker 7"
Hook Hanger
15:00 - 18:00 3.00 CASE P COMP Tripping in with liner, went thru window no problem, liner shoe
8,102', liner top 5,247'. Down wt 93,000 pick up wt. 125,000,
hook window on second try.
18:00 - 19:00 1.00 CASE P COMP Drop ball and pump down @ 3 bbls min. pressure up to 2,600
psi and release liner. Pull up 10ft and sheared ball with 3,600
ps, pick up wt. 110,000#
19:00 - 19:30 0.50 CASE P COMP Circ bottons up and slug pipe
19:30 - 20:30 1.00 CASE N DFAL COMP Attempt to pull out and liner running tool, hanging up on
diverter collet that should release wt 15,000# overpull
working pipe up to 150,000 pick up, unhooked liner one time
and re hook
20:30 - 00:00 3.50 CASE N DFAL COMP Circ 5 bbls min. 550 psi, Waiting and giving time for liner to
wall stick.
3/11/2003 00:00 - 00:30 0.50 CASE N DFAL COMP Circ 5 bbls min. 550 psi, Waiting and giving time for liner to
wall stick.
00:30 - 01 :00 0.50 CASE N DFAL COMP Trying to pull free from hanger, pull at 5,000# stages starting
with 150,000# when we got to 165,000 the liner come
unhooked and started coming up hole, re hook liner and picked
up again and liner moved with 125,000 pull, rehook liner and
circ. Called town
01 :00 - 05:00 4.00 CASE N DFAL COMP Pulling out of hole with liner, no problems
05:00 - 06:00 1.00 CASE N DFAL COMP Laying down, Baker hanger
06:00 - 10:30 4.50 CASE N DFAL COMP Wait on new Baker hanger
10:30 - 11 :30 1.00 CASE N DFAL COMP Picking up new Baker 7 5/8 hookwallliner hanger
11 :30 - 12:30 1.00 CASE N DFAL COMP Tripping hole 26 sds.drill pipe to top of window @ 5,270'
12:30 - 15:00 2.50 CASE N DFAL COMP Attempt to exit window, found window after 5th try, space shoe
in middle of window and rot. with no indication of TQ spikes,
worked pipe at 1/2 turns till exit on 5th try
Printed: 3/17/2003 8:52:53 AM
)
)
BP
Operations Summary Report
Trip into open hole with liner P/U wt 125K S/O 95K , hook liner
@ 5,282' liner top @ 5,247', shoe @ 8,102'
Drop 29/32 ball, pumped down @ 1 112 bbl min. to ball seat,
release liner with 2600 psi, free P/U wt 110,000, collet pulled
with 130,000, shear ball with 3,850 psi, stand back one stand
Slug pipe tripping out, layed down excess pipe
Tripping in with DCs and laid down same
Trip in hole open with 4" drill pipe
Pick up Halliburton 7 5/8 storm packer and hang drll pipe off @
4982', to secure well.
Pull wear ring, Nipple down BOPs
Nipple down BOPs
Nipple down Tubing spool and Orient tubing spool valves North
and South, nipple tubing spool back up, test to 5000 psi for 10
min.
Nipple up BOPS
Rig up and test choke lines and upper tubing spool flange to
250-4,000 psi
Rig up, pull Halliburton storm packer and laydown
Trip in to 5,237
Displace well with two hole volumes wi 8.8 brine follow by 9.2
brine with 25 gals per 100 bbls corrosion inhibitor, Rot. 120
rpms 10 bbls min.
Monitor well, Tripping out, stand back 20 stands in derrick, lay
down rest of pipe
Slip and cut drill line
Finish laying down drill pipe, pull wear ring
Rig up to run 4.5 completion, PJSM on running completion
Picking up 4.5 completion, 3.5 wire line entry guide @ 5135,
XN nipple 3.5 @5131, 7 5/8 x 4.5 Baker Premier Packer@
5088, otis X nipple@ 5072, Phoenix jet pump gauge sensor@
5060, XD sliding sleeve@ 5040, Phoenix pressure gauge@
5026,71 jts 4.5 12.6 L-80 IBT tubing, 4.5 KGB-2 GLM wi RP
valve@ 2077, 49 jts 4.512.6 L-80 IBT tubing, FMC hanger Gen
6, I-wire clamps 68, P/U wt. 95K S/O wt.90K Block wt 50K
M/U hanger and landing jt., M/U I-Wire connect
M/U I-Wire connect, Land 4.5 completion, with TWC in place
Test TWC with 1000 Psi, Blow down all service lines, choke
lines, hole fill lines
Nipple down and set back bops
Nipple up Fmc 11" X 4 1/16 5,000 tubing head adapter test to
5,000 psi, nipple up CIW 41/165,000 psi tree, test tree to
5,000 psi
Pull TWC, pull with dry rod
Drop ball to set packer, pressure up to 4,000 psi set packer at
5,081' and test tubing, recorded press for 30 min., Bleed
pressure back to 2,500, pressure up on annulus to 4,500 psi
recorded press for 30 min., bleed tubing presure off and shear
rp valve shear @ 2,500 psi
COMP Pump 80 bbls diesel down annulus, taking returns up tubing
2.5 bbls min. 2500 psi diesed @ 1800 ft.
COMP U-tube diesel F/annulus to tubing, shut in tubing=120psi-shut
annulus 120psi
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
From - To Hours Task Code NPT Phase
3/11/2003 15:00 - 15:30 0.50 CASE N DFAL COMP
15:30 - 16:30 1.00 CASE N DFAL COMP
16:30-19:30 3.00 CASE P COMP
19:30 - 21 :00 1.50 CASE P COMP
21 :00 - 22:30 1.50 CASE P COMP
22:30 - 23:30 1.00 CASE N HMAN COMP
23:30 - 00:00 0.50 CASE N COMP
3/12/2003 00:00 - 01 :30 1.50 CASE N COMP
01 :30 - 03:00 1.50 CASE N COMP
03:00 - 04:30 1.50 CASE N COMP
04:30 - 05:00 0.50 CASE N COMP
05:00 - 05:30 0.50 CASE P COMP
05:30 - 08:00 2.50 CASE P COMP
08:00 - 11 :00 3.00 CASE P COMP
11 :00 - 12:30 1.50 CASE P COMP
12:30 - 14:00 1.50 CASE P COMP
14:00 - 15:00 1.00 RUNCOIVP COMP
15:00 - 23:30 8.50 RUNCOIVP COMP
23:30 - 00:00 0.50 RUNCOIVP COMP
3/13/2003 00:00 - 01 :30 1.50 RUNCOIVP COMP
01 :30 - 02:30 1.00 RUNCOIVP COMP
02:30 - 03:30 1.00 RUNCOIVP COMP
03:30 - 06:00 2.50 RUNCOIVP COMP
06:00 - 06:30 0.50 RUNCOIVP COMP
06:30 - 08:00 1.50 RUNCOIVP COMP
08:00 - 09:00
1.00 RUNCOIVP
09:00 - 10:00
1.00 RUNCOIVP
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
Description of Operations
Printed: 311712003 8:52:53 AM
')
)
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-12
MPS-12
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 2/26/2003
Rig Release: 3/13/2003
Rig Number:
Spud Date: 2/26/2003
End:
From - To Hours Task Code NPT Phase
Description of Operations
3/13/2003
10:00 - 11 :00
11:00-12:00
1.00 RUNCOIVP
1.00 RUNCOIVP
COMP R/u lubricator set CIW 4" type H BPV, rig down lubricator
COMP Secure well, clean cellar, Rig released @ 12:00 3/13/2003
Printed: 3/17/2003 8:52:53 AM
Legal Name:
Common Name:
Test Date
3/1/2003
3/4/2002
FIT
FIT
MPS-12
MPS-12
Test Type
Test Depth (TMD)
2,240.0 (ft)
5,809.0 (ft)
BPEXPLORATION
Leak-Off TesfSummary
Test Depth (TVD)
2,240.0 (ft)
4,207.0 (ft)
AMW
9.20 (ppg)
9.30 (ppg)
Suñace Pressure
270 (psi)
400 (psi)
. Leak Off Pressure> (SAP)
1,341 (psi)
2,432 (psi)
EMW
11.52 (ppg)
11.13 (ppg)
-
~'
Printed: 3/17/2003 8:52:46 AM
')
)
¿b3 ~mf
16-Apr-03
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well MPS-12 L 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey: 5,257.98' MD
Window / Kickoff Survey: 5,270.00' MD (if applicable)
Projected Survey: 8,150.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
f~F'''E·\l~ffl~
r'\~" \J ." I ,t e;.- LJ
APR 2 2 2003
b~3ks Oti & Ga.s Cons, (~}m~hmìtm
Ancborag~
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-12L 1
-0'
Job No. AKZZ2309935. Surveyed: 9 March. 2003
Survey Report
15 April, 2003
Your Ref: API 500292313960
Surface Coordinates: 6000002.26 N. 565917.32 E (70024' 37.6045" N. 149027' 47.7008" W)
Grid Coordinate System: NAD27 Alaska State Planes. Zone 4
~
Surface Coordinates relative to Project H Reference: 1000002.26 N. 65917.32 E (Grid)
Surface Coordinates relative to Structure: 31.03 N. 427.42 W (True)
Kelly Bushing: 72. 60ft above Mean Sea Level
Elevation relative to Project V Reference: 72.60ft
Elevation relative to Structure: 72.60ft
s¡ ....... ·...,y-!!5UI!
D fit I Cl.':':fi\fS" --$ EFt" n::e's
A Halliburton Company
Survey Ref: svy1153
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS·12L 1
Your Ref: AP/500292313960
Job No. AKZZ2309935, Surveyed: 9 March, 2003
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) C/100ft)
5257.98 77.810 37.990 4037.87 4110.47 1289.15 N 1602.26 E 6001305.50 N 567508.14 E 1853.35 Tie On Point
5270.00 77.930 37.180 4040.39 4112.99 1298.46 N 1609.42 E 6001314.87 N 567515.22 E 6.664 1864.84 Window Point
5302.47 79.380 33.880 4046.78 4119.38 1324.36 N 1627.92 E 6001340.94 N 567533.49 E 10.919 1896.19
5351.25 84.370 28.960 4053.68 4126.28 1365.55 N 1653.07 E 6001382.35 N 567558.27 E 14.292 1944.19
5397.79 88.460 24.330 4056.59 4129.19 1407.05 N 1673.88 E 6001424.03 N 567578.72 E 13.258 1990.61
5447.81 86.420 19.380 4058.83 4131 .43 1453.41 N 1692.48 E 6001470.55 N 567596.91 E 10.694 2040.46 -'
5494.12 86.850 14.790 4061.55 4134.15 1497.59 N 1706.06 E 6001514.85 N 567610.09 E 9.938 2086.18
5545.94 86.910 9.670 4064.37 4136.97 1548.14 N 1717.02 E 6001565.50 N 567620.60 E 9.866 2136.52
5589.79 87.160 5.320 4066.64 4139.24 1591.55 N 1722.73 E 6001608.95 N 567625.93 E 9.923 2178.16
5639.42 86.290 0.410 4069.47 4142.07 1641.02 N 1725.20 E 6001658.44 N 567627.97 E 10.031 2223.88
5685.71 87.840 355.840 4071 .85 4144.45 1687.21 N 1723.69 E 6001704.62 N 567626.05 E 10.412 2264.92
5734.29 88.890 351.040 4073.23 4145.83 1735.44 N 1718.14 E 6001752.79 N 567620.08 E 10.110 2306.06
5781.09 88.950 351.060 4074.11 4146.71 1781.66 N 1710.86 E 6001798.95 N 567612.39 E 0.135 2344.65
5829.22 87.780 349.970 4075.49 4148.09 1829.11 N 1702.94 E 6001846.33 N 567604.05 E 3.322 2384.06
5875.24 87.840 349.360 4077.25 4149.85 1874.35 N 1694.69 E 6001891.50 N 567595.40 E 1.331 2421.34
5924.77 87.840 350.560 4079.11 4151.71 1923.09 N 1686.06 E 6001940.15 N 567586.34 E 2.421 2461.62
5971.84 88.830 350.520 4080.48 4153.08 1969.50 N 1678.32 E 6001986.49 N 567578.20 E 2.105 2500.18
6023.02 89.140 349.600 4081 .39 4153.99 2019.90 N 1669.49 E 6002036.82 N 567568.92 E 1.897 2541.87
6067.23 89.440 349.880 4081.94 4154.54 2063.40 N 1661.62 E 6002080.24 N 567560.66 E 0.928 2577.74
6116.75 88.020 352.170 4083.03 4155.63 2112.30 N 1653.89 E 6002129.07 N 567552.51 E 5.440 2618.55
6160.27 88.950 353.920 4084.18 4156.78 2155.48 N 1648.63 E 6002172.21 N 567546.86 E 4.552 2655.26
6212.13 89.260 351.620 4084.99 4157.59 2206.92 N 1642.10 E 6002223.58 N 567539.88 E 4.475 2698.87
6258.49 89.260 354.540 4085.59 4158.19 2252.93 N 1636.52 E 6002269.55 N 567533.89 E 6.298 2738.00
6308.66 91.670 354.860 4085.19 4157.79 2302.88 N 1631.88 E 6002319.45 N 567528.81 E 4.846 2781.09 c-"
6353.08 90.930 356.990 4084.18 4156.78 2347.17 N 1628.73 E 6002363.72 N 567525.27 E 5.075 2819.71
6402.16 91.980 358.460 4082.93 4155.53 2396.20 N 1626.78 E 6002412.72 N 567522.89 E 3.680 2863.12
6449.07 92.350 357.590 4081.16 4153.76 2443.05 N 1625.16 E 6002459.55 N 567520.86 E 2.014 2904.71
6498.55 90.560 355.370 4079.90 4152.50 2492.41 N 1622.13 E 6002508.89 N 567517.39 E 5.762 2947.96
6546.17 89.940 352.760 4079.70 4152.30 2539.77 N 1617.20 E 6002556.21 N 567512.05 E 5.633 2988.58
6595.53 89.380 353.540 4079.99 4152.59 2588.78 N 1611.32 E 6002605.16 N 567505.73 E 1.945 3030.28
6641.76 88.890 354.360 4080.69 4153.29 2634.75 N 1606.44 E 6002651.08 N 567500.45 E 2.066 3069.67
6692.50 87.780 353.090 4082.16 4154.76 2685.16 N 1600.90 E 6002701.44 N 567494.46 E 3.323 3112.79
6737.72 88.150 353.160 4083.77 4156.37 2730.02 N 1595.49 E 6002746.26 N 567488.66 E 0.833 3150.96
6788.53 88.270 352.830 4085.35 4157.95 2780.43 N 1589.30 E 6002796.61 N 567482.02 E 0.691 3193.79
6834.07 88.090 352.520 4086.80 4159.40 2825.58 N 1583.49 E 6002841 .70 N 567475.82 E 0.787 3232.04
15 April, 2003·11:10 Page 2 of 4 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12L 1
Your Ref: API 500292313960
Job No. AKZZ2309935, Surveyed: 9 March, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6883.83 87.470 352.880 4088.73 4161.33 2874.90 N 1577.18 E 6002890.96 N 567469.06 E 1 .441 3273.83
6929.68 87.1 00 355.840 4090.90 4163.50 2920.47 N 1572.68 E 6002936.49 N 567464.16 E 6.499 3313.03
6980.58 86.790 357.080 4093.61 4166.21 2971.20 N 1569.54 E 6002987.19 N 567460.57 E 2.508 3357.46
7025.66 88.390 0.900 4095.51 4168.11 3016.22 N 1568.75 E 6003032.21 N 567459.38 E 9.180 3397.76
7075.80 88.640 359.470 4096.81 4169.41 3066.34 N 1568.91 E 6003082.33 N 567459.10 E 2.894 3443.07
7122.13 88.580 358.070 4097.93 4170.53 3112.65 N 1567.91 E 6003128.62 N 567457.70 E 3.024 3484.43 -
7172.25 89.820 357.860 4098.63 4171.23 3162.73 N 1566.13 E 6003178.69 N 567455.48 E 2.509 3528.87
7217.61 90.190 359.400 4098.63 4171.23 3208.07 N 1565.05 E 6003224.02 N 567453.99 E 3.492 3569.33
7268.11 87.960 3.310 4099.44 4172.04 3258.54 N 1566.24 E 6003274.50 N 567454.74 E 8.912 3615.40
7314.12 86.660 3.720 4101.60 4174.20 3304.41 N 1569.06 E 6003320.39 N 567457.15 E 2.962 3658.01
7364.17 87.650 4.980 4104.09 4176.69 3354.25 N 1572.85 E 6003370.27 N 567460.51 E 3.199 3704.63
7410.30 87.41 0 10.100 4106.08 4178.68 3399.93 N 1578.90 E 6003415.99 N 567466.15 E 11.101 3748.46
7460.79 86.360 11.390 4108.82 4181 .42 3449.46 N 1588.30 E 6003465.60 N 567475.11 E 3.291 3797.21
7506.84 84.810 14.610 4112.37 4184.97 3494.19 N 1598.62 E 6003510.42 N 567485.04 E 7.741 3842.03
7557.02 84.000 16.890 4117.26 4189.86 3542.25 N 1612.17 E 6003558.60 N 567498.17 E 4.801 3891.24
7603.76 84.810 16.940 4121.82 4194.42 3586.75 N 1625.71 E 6003603.22 N 567511.31 E 1.736 3937.24
7654.22 85.310 20.570 4126.16 4198.76 3634.35 N 1641.87 E 6003650.96 N 567527.05 E 7.235 3987.15
7699.65 85.000 22.020 4130.00 4202.60 3676.52 N 1658.31 E 6003693.28 N 567543.12 E 3.253 4032.30
7748.83 84.740 26.140 4134.40 4207.00 3721.24 N 1678.29 E 6003738.16 N 567562.70 E 8.361 4081.26
7795.47 84.690 25.060 4138.69 4211.29 3763.12 N 1698.36 E 6003780.22 N 567582.40 E 2.308 4127.70
7845.79 84.000 24.900 4143.65 4216.25 3808.51 N 1719.50 E 6003825.80 N 567603.14 E 1 .407 4177.77
7890.63 83.440 24.450 4148.56 4221 .16 3849.01 N 1738.11 E 6003866.46 N 567621.39 E 1.598 4222.33
7941 .19 82.450 25.260 4154.77 4227.37 3894.54 N 1759.20 E 6003912.17 N 567642.08 E 2.522 4272.51
7986.41 86.050 29.1 00 4159.30 4231.90 3934.55 N 1779.75 E 6003952.36 N 567662.28 E 11.608 4317.46 .~
8036.07 86.850 29.630 4162.37 4234.97 3977.74 N 1804.05 E 6003995.77 N 567686.20 E 1.931 4366.92
8082.11 87.530 28.950 4164.63 4237.23 4017.85 N 1826.55 E 6004036.07 N 567708.34 E 2.087 4412.80
8150.00 87.530 28.950 4167.56 4240.16 4077.20 N 1859.38 E 6004095.71 N 567740.65 E 0.000 4480.50 Projected Survey
15 April, 2003 - 11:10
Page 30f4
DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12L1
Your Ref: API 500292313960
Job No. AKZZ2309935, Surveyed: 9 March, 2003
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
BPXA
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 25.500° (True).
Magnetic Declination at Surface is 25.583°(26-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 8150.00ft.,
The Bottom Hole Displacement is 4481.17ft., in the Direction of 24.515° (True).
--
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
5257.98
5270.00
8150.00
4110.47
4112.99
4240.16
1289.15 N
1298.46 N
4077.20 N
1602.26 E
1609.42 E
1859.38 E
Tie On Point
Window Point
Projected Survey
Survey tool program for MPS-12L 1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
"-"
0.00
882.00
0.00
881.94
882.00
8150.00
881.94 Tolerable Gyro (MPS-12PB1 Gyro)
4240.16 AK-6 BP _IFR-AK (MPS-12PB1)
15 April, 2003 - 11:10
Page 40f4
DrillQuest 3.03.02.005
)
)
a08-Q;{¡
16-Apr-03
AOGCC
Lisa Weepie
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-12 L 1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey: 5,257.98' MD
Window / Kickoff Survey: 5,270.00' MD (if applicable)
Projected Survey: 8,150.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
AUachment(s)
C· 1'''''~'' ~" ! 1. _._c_ ',,"''':,
F'~ r~~·· i~ .... rr ~ ':\ ~~~:::J ~ 11
~"~::'-= -1,\ ,. r ~ ~i' :í"""u ~
, I: \ ':...:i? ~~~~'i;. ',~ :r.. ~
\.I~..' ;\:::' '\OOJ,
^P-R r¡ 2. <;('·'13
-\. ,~ ... " \,¡
I~ 1a""..f-'J n;·~ ~:, I ~;~;3 GO(;i:'. ~})mm!~OO
,f'i~ iJh'J'" Ii". ... ~.. .
Ar\chGf!.£t~
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-12L1 MWD
-'
Job No. AKMW2309935, Surveyed: 9 March, 2003
Survey Report
15 April, 2003
Your Ref: API 500292313960
Surface Coordinates: 6000002.26 N, 565917.32 E (70024' 37.6045" N, 149027'47.7008" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
~
Surface Coordinates relative to Project H Reference: 1000002.26 N, 65917.32 E (Grid)
Surface Coordinates relative to Structure: 31.03 N, 427.42 W (True)
Kelly Bushing: 72.60ft above Mean Sea Level
Elevation relative to Project V Reference: 72.60ft
Elevation relative to Structure: 72.60ft
sr..... ·......V-SUI!
ºRI·L.~~lN·G":,J5EæA ".fEES
A Halliburton Company
Survey Ref: svy1154
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12L 1 MWD
Your Ref: API 500292313960
Job No. AKMW2309935, Surveyed: 9 March, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
5257.98 77.810 38.210 4037.87 4110.47 1279.07 N 1609.98 E 6001295.49 N 567515.95 E 1847.59 Tie On Point
5270.00 77.930 37.180 4040.40 4113.00 1288.37 N 1617.17E 6001304.86 N 567523.06 E 8.437 1859.08 Window Point
5302.47 79.380 33.880 4046.78 4119.38 1314.28 N 1635.66 E 6001330.92 N 567541.32 E 10.919 1890.42
5351 .25 84.370 28.960 4053.68 4126.28 1355.47 N 1660.81 E 6001372.33 N 567566.10 E 14.292 1938.42
5397.79 88.460 24.330 4056.59 4129.19 1396.97 N 1681.63 E 6001414.01 N 567586.55 E 13.258 1984.84
5447.81 86.420 19.380 4058.83 4131 .43 1443.33 N 1700.22 E 6001460.54 N 567604.74 E 10.694 2034.69 --
5494.12 86.850 14.790 4061.55 4134.15 1487.51 N 1713.80 E 6001504.83 N 567617.93 E 9.938 2080.41
5545.94 86.910 12.520 4064.37 4136.97 1537.78 N 1726.02 E 6001555.22 N 567629.70 E 4.376 2131.05
5589.79 87.160 5.590 4066.64 4139.24 1581.00 N 1732.90 E 6001598.49 N 567636.20 E 15.793 2173.02
5639.42 86.290 358.170 4069.48 4142.08 1630.49 N 1734.53 E 6001647.99 N 567637.39 E 15.029 2218.39
5685.71 87.840 356.220 4071.85 4144.45 1676.66 N 1732.27 E 6001694.14 N 567634.72 E 5.377 2259.09
5734.29 88.890 351.380 4073.24 4145.84 1724.92 N 1727.02 E 6001742.36 N 567629.05 E 10.191 2300.39
5781.09 88.950 351 .280 4074.12 4146.72 1771.18 N 1719.97 E 6001788.55 N 567621.59 E 0.249 2339.10
5829.22 87.780 350.320 4075.49 4148.09 1818.67 N 1712.28 E 6001835.97 N 567613.48 E 3.144 2378.66
5875.24 87.840 350.170 4077.25 4149.85 1863.99 N 1704.49 E 6001881.22 N 567605.29 E 0.351 2416.21
5924.77 87.840 350.960 4079.12 4151 .72 1912.81 N 1696.37 E 6001929.97 N 567596.75 E 1.594 2456.79
5971.84 88.830 350.520 4080.48 4153.08 1959.25 N 1688.80 E 6001976.34 N 567588.77 E 2.301 2495.44
6023.02 89.140 349.600 4081.39 4153.99 2009.65 N 1679.97 E 6002026.66 N 567579.49 E 1.897 2537.13
6067.23 89.440 351.000 4081.94 4154.54 2053.23 N 1672.52 E 6002070.17 N 567571.66 E 3.238 2573.25
6116.75 88.020 354.390 4083.04 4155.64 2102.32 N 1666.23 E 6002119.21 N 567564.93 E 7.420 2614.86
6160.27 88.950 354.420 4084.19 4156.79 2145.62 N 1661.99 E 6002162.47 N 567560.30 E 2.138 2652.11
6212.13 89.260 352.160 4085.00 4157.60 2197.12 N 1655.93 E 6002213.91 N 567553.79 E 4.398 2695.98
6258.49 89.260 354.800 4085.60 4158.20 2243.17 N 1650.66 E 6002259.91 N 567548.12 E 5.694 2735.28
6308.66 91.670 354.860 4085.19 4157.79 2293.13 N 1646.14 E 6002309.83 N 567543.16 E 4.805 2778.43 ---
6353.08 90.930 357.870 4084.18 4156.78 2337.44 N 1643.33 E 6002354.12 N 567539.96 E 6.976 2817.21
6402.16 91.980 358.600 4082.93 4155.53 2386.48 N 1641.82 E 6002403.14 N 567538.01 E 2.605 2860.82
6449.07 92.350 358.440 4081.16 4153.76 2433.34 N 1640.61 E 6002449.99 N 567536.39 E 0.859 2902.60
6498.55 90.560 355.410 4079.91 4152.51 2482.73 N 1637.95 E 6002499.35 N 567533.30 E 7.111 2946.03
6546.17 89.940 352.970 4079.70 4152.30 2530.10 N 1633.13 E 6002546.67 N 567528.06 E 5.287 2986.71
6595.53 89.380 353.700 4079.99 4152.59 2579.12 N 1627.40 E 6002595.65 N 567521.90 E 1.864 3028.50
6641.76 88.890 354.890 4080.69 4153.29 2625.12 N 1622.81 E 6002641.60 N 567516.90 E 2.783 3068.03
6692.50 87.780 353.430 4082.16 4154.76 2675.57 N 1617.65 E 6002692.01 N 567511.29 E 3.614 3111.35
6737.72 88.150 353.460 4083.77 4156.37 2720.47 N 1612.49 E 6002736.85 N 567505.74 E 0.821 3149.65
6788.53 88.270 353.270 4085.36 4157.96 2770.91 N 1606.62 E 6002787.25 N 567499.42 E 0.442 3192.65
6834.07 88.090 352.900 4086.80 4159.40 2816.10 N 1601.14 E 6002832.38 N 567493.55 E 0.903 3231.08
15 April, 2003 - 11:12 Page 2 of4 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12L 1 MWD
Your Ref: API 500292313960
Job No. AKMW2309935, Surveyed: 9 March, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6883.83 87.470 352.950 4088.73 4161.33 2865.44 N 1595.02 E 6002881.67 N 567486.99 E 1.250 3272.98
6929.68 87.100 356.070 4090.90 4163.50 2911.03 N 1590.64 E 6002927.21 N 567482.20 E 6.845 3312.24
6980.58 86.790 357.470 4093.61 4166.21 2961.77 N 1587.77 E 6002977.93 N 567478.89 E 2.813 3356.81
7025.66 88.390 1 .420 4095.51 4168.11 3006.80 N 1587.34 E 6003022.95 N 567478.06 E 9.446 3397.26
7075.80 88.640 359.730 4096.81 4169.41 3056.92 N 1587.84 E 6003073.07 N 567478.12 E 3.406 3442.71
7122.13 88.580 358.330 4097.93 4170.53 3103.23 N 1587.06 E 6003119.37 N 567476.93 E 3.024 3484.17 --
7172.25 89.820 357.920 4098.63 4171.23 3153.31 N 1585.42 E 6003169.44 N 567474.84 E 2.606 3528.67
7217.61 90.190 359.470 4098.63 4171.23 3198.66 N 1584.38 E 6003214.78 N 567473.41 E 3.513 3569.16
7268.11 87.960 3.370 4099.45 4172.05 3249.13 N 1585.63 E 6003265.25 N 567474.22 E 8.895 3615.25
7314.12 86.660 3.850 4101.61 4174.21 3294.99 N 1588.53 E 6003311.14 N 567476.71 E 3.012 3657.89
7364.17 87.650 5.400 4104.09 4176.69 3344.82 N 1592.56 E 6003361.00 N 567480.30 E 3.671 3704.60
7410.30 87.41 0 10.320 4106.08 4178.68 3390.46 N 1598.86 E 6003406.69 N 567486.19 E 10.668 3748.50
7460.79 86.360 11 .960 4108.82 4181.42 3439.92 N 1608.60 E 6003456.24 N 567495.50 E 3.853 3797.34
7506.84 84.810 14.920 4112.37 4184.97 3484.57 N 1619.27 E 6003500.98 N 567505.77 E 7.239 3842.23
7557.02 84.000 17.350 4117.26 4189.86 3532.54 N 1633.14 E 6003549.07 N 567519.22 E 5.083 3891.50
7603.76 84.810 17.450 4121.82 4194.42 3576.93 N 1647.06 E 6003593.58 N 567532.74 E 1.746 3937.56
7654.22 85.310 21.540 4126.17 4198.77 3624.31 N 1663.83 E 6003641.11 N 567549.10 E 8.136 3987.54
7699.65 85.000 22.590 4130.00 4202.60 3666.26 N 1680.83 E 6003683.21 N 567565.73 E 2.402 4032.73
7748.83 84.740 26.630 4134.40 4207.00 3710.78 N 1701.23 E 6003727.91 N 567585.73 E 8.199 4081.70
7795.47 84.690 25.600 4138.70 4211.30 3752.48 N 1721.67 E 6003769.79 N 567605.80 E 2.202 4128.13
7845.79 84.000 25.420 4143.66 4216.26 3797.68 N 1743.24 E 6003815.17 N 567626.97 E 1.417 4178.21
7890.63 83.440 24.380 4148.56 4221.16 3838.10 N 1762.00 E 6003855.76 N 567645.38 E 2.622 4222.78
7941 .19 82.450 25.620 4154.77 4227.37 3883.58 N 1783.21 E 6003901.42 N 567666.18 E 3.124 4272.95
7986.41 86.050 29.540 4159.30 4231.90 3923.44 N 1804.03 E 6003941 .47 N 567686.66 E 11 .737 4317.90 ~
8036.07 86.850 30.010 4162.38 4234.98 3966.46 N 1828.65 E 6003984.71 N 567710.89 E 1.867 4367.32
8082.11 87.530 29.370 4164.63 4237.23 4006.41 N 1851.42 E 6004024.85 N 567733.31 E 2.027 4413.18
8150.00 87.530 29.370 4167.56 4240.16 4065.52 N 1884.69 E 6004084.25 N 567766.05 E 0.000 4480.86 Projected Survey
15 April, 2003 - 11:12
Page 3 of 4
DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-12L 1 MWD
Your Ref: API 500292313960
Job No. AKMW2309935, Surveyed: 9 March, 2003
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 25.500° (True).
Magnetic Declination at Surface is 25.583°(26-Feb-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 8150.00ft.,
The Bottom Hole Displacement is 4481.13ft., in the Direction of 24.871 ° (True).
.~
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
5257.98
5270.00
8150.00
4110.47
4113.00
4240.16
1279.07 N
1288.37 N
4065.52 N
1609.98 E
1617.17 E
1884.69 E
Tie On Point
Window Point
Projected Survey
Survey tool profJram for MPS-12L 1 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
.--
0.00
882.00
0.00
881.94
882.00
8150.00
881.94 Tolerable Gyro (MPS-12PB1 Gyro)
4240.16 MWD Magnetic (MPS-12PB1 MWD)
15 April, 2003 - 11:12
Page 4 of 4
DrillQuest 3.03.02.005
~~~:E
(';::;"'I
)
f ~~!Æ~~~!Æ
)
,
o
FRANK H. MURKOWSKI, GOVERNOR
AIßASIiA. OIL AND GAS
CONSERVATION COlWlISSION
333 W. 7fH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P. O. Box 196612
Anchorage, Alaska 99519-6612
Re: Milne Point Unit S-12Ll
BP Exploration (Alaska) Inc.
Pennit No: 203-024
Surface Location: 3334' NSL, 93' WEL, SEC. 12, T12N, R10E, UM
Bottomhole Location: 2528' NSL, 2041' EWL, SEC. 06, T12N, RIlE, UM
Dear Mr. Archey:
Enclosed is the approved application for'pennit to drill the above referenced development well.
This pennit to drill does not exempt you from obtaining additional pennits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required pennits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the pennit in the event it was erroneously issued.
The pennit is for a new wellbore segment of existing well MPS-12, Pennit No. 203-023, API 50-
029-23139-00. Production should continue to be reported as a function of the original API
number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless. the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the tenns and conditions of this pennit may
result in the revocation or suspension of the pennit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~¿;z-~
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this ¿~ day of February, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
.,
~iGA- z.-Ic./IO 3
12. Distance to nearest property line 13. Distance to nearest well
ADL 380109,2041' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 5327' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casina Weiaht Grade Couplina
4-1/2" 12.7# L-80 BTC
Hole
6-1/8"
J' STATE OF ALASKA )
ALAS(¡, ··IL AND GAS CONSERVATION COMtvlISSION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well [J Exploratory [J Stratigraphic Test II Development Oil
[J Service [J Development Gas [J Single Zone [J Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Plan KBE = 62.1' Milne Point Unit I Schrader
6. Property Designation Bluff
ADL380110
7. Unit or Property Name
Milne Point Unit
8. Well Number /'
MPS-12L 1
9. Approximate spud date
03/04/03 Amount $200,000.00
/' 14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 8584' MD I 4171' TVD
o 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
97 Maximum surface 1403 psig, At total depth (TVD) 4204' I 1824 psig
Setting Depth
Top Bottom Quantitv of Cement
Lenath MD TVD MD TVD (include staae data)
3257' 5327' 4151' 8584' 4171' Uncemented Slotted Liner /'
/"
Multilateral
1 a. Type of work II Drill [J Redrill
[J Re-Entry [J Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface x = 565917, Y = 6000002
3334' NSL, 93' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval x = 567541, Y = 6001376
4692' NSL, 1542' EWL, SEC. 07, T12N, R11E, UM
At total depth x = 568012, Y = 6004495
2528' NSL, 2041' EWL, SEC. 06, T12N, R11 E,UM
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
8600 feet
4226 feet
8600 feet
4226 feet
Length
Plugs (measured)
Junk (measured)
Size
Cemented MD TVD
260 sx Arctic Set (Approx.) 112. 112.
536 sx Class 'L', 220 sx Class 'G' 2250' 2250'
60 sx Class 'L', 308 sx Class 'G' 5536' 4202'
Uncemented Slotted Liner 5386' - 8600' 4120' - 4226'
112' 20"
2250' 10-3/4"
5536' 7-5/8"
3214' 4-1/2"
Perforation depth: measured Slotted Liner
true vertical Slotted Liner
20. Attachments
II Filing Fee [J Property Plat [J BOP Sketch [J Diverter Sketch II Drilling Program
II Drilling Fluid Program [J Time vs Depth Plot [J Refraction Analysis [J Seabed Report II 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By Name/Number: Terrie Hubble, 564-4628
21. Is~:~:Y c:.~:::::t theþr~ing iCl:d:;to :~:;i~::: Engineer Date 1/ 3"ù /t; 3
Permit Number. API Number ) r App~ovp:1 Da~) ~ See cover letter
.2o~ - ð..2- ~ 50- c 2- 9 - ..2- 3 3 7 - .k:) C> '/>\ I(.t IG ? for other reauirements
Conditions of Approval: Samples Required 0 Yes ~ No Mud Log Required 0 Yes ßNo
Hydrogen Sulfide Measures 0 Yes I8J No Directional Survey Required .E Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: T~·~ t- go!) PC::- ~ 'fooo p~ l .
ORIGINAL S'GNEO B'l
MLOm
Approved By
Form 10-401 Rev. 12-01-85
Çommissioner
by order of
the commission
Date /~ IL ( fO_3
Suomit In Triplicate
') )ne Point MPS-12 Well Permit
IWell Name: I MPS-12 L 1
Drill and Complete Plan Summary
I Type of Well (service I producer I injector): 1 Multi Lateral Producer "OA" & "OB"
Surface Location:
Target Location:
TOP "OA"
Target Location:
BHL "OA" Well TD
Target Location:
TOP "OB"
Target Location:
BHL "OB" Well TD
19451 FNL, (33341 FSL), 931 FEL, (5187' FWL), SEC. 12, T12N,R1 OE
E=565917.32 N=6000002.26
586' FNL, (46921 FSL), 3232' FEL, (15421 FWL), SEC. 7, T12N, R11 E
E=567540.69 N=6001376.04 Z=4151' TVD/RKB
27511 FNL, (25281 FSL), 2721' FEL, (20411 FWL), SEC. 6, T12N, R11 E
E=568.012.0 N=6004495.0 Z=4171' TVD
400' FNL, (48781 FSL), 3150' FEL, (16241 FWL), SEC. 7, T12N,R11 E
E=567621.0 N=6001563.0 Z=4202' TVD
27511 FNL, (25281 FSL), 2721' FEL, (20411 FWL), SEC. 6, T12N,R11 E
E=568012.00 N=6004495.0 Z=4226' TVD
I AFE Number: I
I Estimated Start Date: 13/4/03
I MD: 185841 1 TVD: 14171 I
I Rig: I Doyon 14
I OperatinQ days to complete: 120.4
I Max Inc: 197 I I KOP: 153271 I KBE: 162.1
I Well DesiQn (conventional, slim hole, etc.): I Conventional Grass Roots ML Producer
1 Objective: I Schrader OA & OB Sand
Mud Program:
12.25-in Surface Hole Mud Properties:
Density (ppg) Funnel visc YP HTHP
8.6 - 9.0 75 -150 25 - 60 N/A
Spud - LSND Freshwater Mud
pH API Filtrate LG Solids
8.5 - 9.5 < 8 < 6.5
9.875-in Intermediate Hole Mud Properties:
Density (ppg) ""Funnel visc YP HTHP
9.0-9.3/ 75-150 25-60 N/A
LSND Freshwater Mud
pH API Filtrate LG Solids
9.0 - 9.5 < 8 < 6.5
6.125-in Production Hole Mud Properties: KCL-CaC03 Flo-Pro
Density (ppg) Funnel visc YP HTHP pH API Filtrate LG Solids
8.6 - 9.3 40 - 55 22 - 27 <10 8.0 - 8.5 4 - 6 < 12
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be
ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R.
1
Cement Program:
')
''f Point MPS-12 Well Permit
Casinç Size 110-3/4" 45.5-lb/ft L-BO BTC Surface Casing
Basis 250% excess over gauge hole in permafrost interval
400/0 excess over gauge hole below permafrost
Total Cement
Volume: 453-bbl Wash 50-bbl water
Spacer
Lead
Tail
Temp
50-bbl Viscosified Spacer (Alpha) weighted to 10.5-lb/gal
536-sx 10.7 Ib/gal Class L - 4.15 cuft/sx (cement to
surface)
220-sx 15.B Ib/gal Prem G - 1.15 cuft/sx (top of tail at
1
BHST :::= BO°F from SOR, BHCT 85°F estimated by
Halliburton
/'
Casinç Size 17-5/8 29.7-lb/ft L-80 BTC Intermediate Casing
Basis 40% excess over gauge hole.
Tail500-ft MD above top of N-sand.
Total Cement
Volume: 35-bbl Wash 50-bbl water
Spacer
Lead
Tail
Temp
Evaluation Program:
50-bbl Viscosified Spacer (Alpha) weighted to 10.50 ppg
60 -sx 10.7 Ib/gal Class L-4.15 cuft/sx (cmt top at 3536')
500' above the of
308-sx 15.8 Ib/gal Prem G - 1.15 cuft/sx (top of tail at
4353' MD) 500' above the top of the N-sand
BHST :::= 80°F from SOR, BHCT 85°F estimated by
Halliburton
/'
13-1/2" Section
Open Hole: MWD/GRI IFRlCASANDRA
Cased Hole: N/A
9-7/8" Section
Open Hole: MWD/GRlRES IFR/CASANDRA
Cased Hole: N/A
6-1/8"Section
Open Hole: MWD/GRlRES ABI/IFRlCASANDRA
2
)
Formation Markers:
Formation Tops
Base Permafrost
Top Ugnu
NA
NB
NC
NE
NF
Top OA
Top OB
TO
MOrkb
(ft)
1822
4036
4853
4928
5020
5062
5227
5326
5536
8600
TVDrkb
(ft)
1822
3622
3987
4017
4052
4067
4122
4151
4202
4226
CasingITubing Program:
Pore Pressure
(psi)
791
1572
1731
1744
1759
1765
1789
1802
1824
r )e Point MPS-12 Well Permit
Estimated EMW
(Ib/gal)*
8.35
8.35
8.35
8.35
8.35
8.35
8.35
8.35
8.35
Hole Csg/ WtlFt Grade Conn Length Top Bottom
Size Tbg O.D. MD /TVDrkb MD I TVDrkb
42-in 20-in* 92# H-40 Weld 112' 0 112-ft / 112-ft
13-1 /2" 10-3/4" 45.5# L-80 BTC 2250' 0 2250' / 2250'
9-7/8" 7-5/8" 29.7# L-80 BTC 5536' 0 5536' / 4202'
6-1/8" 4-1/2" 12.7# L-80 BTC 3214' 5386'/4120' 8600'/4226'
OB
6-1/8" 4-1 /2" 12.7# L-80 BTC 3257' 5327'/4151 8584'/4171 '
OA
*The 20" casing is insulated
Recommended Bit Program:
BHA Hole Size Depth (MD) Bit Type Nozzle/Flow
rate
1 13-1 /2" o - 2250 M ill tooth 3-15 & 1-1 0
2 9-7/8" 2250 - 5536' M ill tooth 3-1 5 & 1-1 0
3 6-1 /8" 5536' - TO Security 3-12
FM2643
3
')
r )e Point MPS-12 Well Permit
Well Control:
Surface Interval
· The surface hole will be drilled with a diverter.
· Integrity test:
· Kick tolerance:
I ntermediate and Production Intervals
· Maximum anticipated BHP: 1,824-psi @ 4,204-ft TVDss - Top of OB-sand
· Maximum surface pressure: 1,403-psi @ surface
(Based on BHP and a full column of gas from TO @ 0.1-psi/ft)
· Planned BOP test pressure: Diverter will be function tested. BOPs: Test annular 250-psi low /
and 2,500-psi high, and rams to 250-psi low and 4,000-psi high.
An FIT to 11.5-lb/gal will be made on the 7-5/8" casing shoe.
25.5-bbl with 10.0-lb/gal mud and FIT of 11.4-lb/gal @ 10-3/4"
casing shoe.
9.2-lb/gal NaCI / 6.8-lb/gal Diesel
· Planned completion fluid:
Drilling Hazards & Contingencies:
Hydrates
· Hydrates have not been seen on S pad, but has been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
· Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation
. We do not expect losses while drilling this well.
· Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
· It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.65 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud.
4
)
ye Point MPS-12 Well Permit
Pad Data Sheet
· Please Read the S-Pad Data Sheet thoroughly.
Breathing
· N/A
Hydrocarbons
· Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
· NA
Hydrogen Sulfide
· MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
· MPS-12 has no anti-collision issues.
5
)
DRILL & COMPLETION PROCEDURE
)e Point MPS-12 Well Permit
,
Pre-Rig Operations
1. Install 20-in insulated conductor.
Procedure
1. MIRU. NU diverter on 20-in conductor and function test.
2. Drill 13-1/2" surface hole as per directional plan.
3. Case and cement 1 0-3/4" surface casing.
4. NO diverter, NU BOPE and test.
5. Perform FIT.
6. Drill 9-7/8" hole to top OB-sand as per directional plan.
7. Case and cement 7-5/8" intermediate casing. Freeze protect 7-5/8" x 10-3/4" annulus
8. Perform FIT.
9. Drill 6-1/8" OB-sand lateral as per directional plan.
10. Run 4-1/2" uncemented slotted liner and hang off 150-ft inside 7-5/8" casing.
11. Set whipstock and mill window at top of OA-sand.
12. Drill 6-1/8" OA-sand lateral as per directional plan.
13. Pull whipstock.
14. Run 4-1/2"uncemented slotted liner with Baker Hookwall Hanger and hang off in 7.0-
in casing.
15. Displace drilling mud to brine.
16. Run 4-1/2" jet pump completion as per schematic.
17. Land tubing hanger and test.
18. Set BPV.
19. NO BOP.
20. Install and test tree.
21. Pull BPV.
22. Test 7-5/8" x 4-1/2" annulus.
23. Freeze protect thru GLM.
24. Install BPV and secure well.
25. RD/MO.
6
PHOPOSI::.IJ COMPLI::.IION
~1PS-"? ~12 ~)1
1f'~
20" 92 Ib/tt, H-40 Welded /
Insulated
Diesel Freeze protect to
750' MD
.2 §
~.pr.... 9-7/8" Hole
~ ' ,,'- 6-1/8" OB Lateral TD
\ " ----
,
, __ 08 Horizontal 6-1/8" hole
-- - - --
TREE:' Cameron 4-1/16" 5M
WELLHEAD: FMC Gen 6 11",5M
Tubing Head: 11" x 4-1/2",
'FMC Tubing Hanger
1121
10-3/4" 45.5#, L-80, BTC-M
Casing Drift: 9.875
Casing 10: 9.794
Coupling 00: 11.75"
Burst: 5,210 psi
Collapse: 2,480 psi
~
9.2 KCI with corrosion
inhibitor as packer fluid
/
Jet Pump Installed in -
Sliding Sleeve Post rig! .
~ III
7-5/8" 29.7#, L-80, BTC-M
Casing Drift: 6.75
Casing ID: 6.875
Coupling 00: 11.75"
Burst: 6,890 psi
Collapse: 4,790 psi
Window in 7-5/8" casing @ 5,327' MD
Well Inclination @ Window = 74 Degrees
4-1/2" liner top @ 5,386' MD (150' lap)
7.625" Casing Shoe @ 5,536' MD,4202'
TVD
Well Inclination @ Shoe = 78 Degrees
PBTD
TD
DATE
130 Sep 02
COMMENTS
Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion
REV. BY
SKC
KB. ELEV =66.5'
Cellar Box ELEV = 38.0'
~ 42" Hole
4-1/2" x 1" Gas Lift Mandrel @ 2,000' MD , 2000' TVD,
RP shear valve open position, "X" Nipple
(2.813" ID) 70' below GLM
4-1/2", 12.61b/ft, L-80, IBT-M Coupling 00: 5.2"
OrifVIO: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7.500. 80%=6.000 psi
....
10-314"@ 2,250' MD, 2250' TVD/RKB
'BIW 1- Wire
Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down
to lower sensor)
Phoenix Pressure Gauge (2.840" ID)
7-5/8" x 4-1/2" Premier Packer Iset @ 5,300' MD, 4143' TVD I
3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod
Wireline Entry Guide
\~
-.....
""--
6-1/8" OA Lateral TD 18,584' MD I
- - --
- -
OA Horizontal 6-1/8" hole
r--
-- -
- -
- -
- -
4-1/2" Slotted Liner W/Hookwall hanger
18,600' MD 1
- -
- -
4-1/2" Slotted Liner & Hanger
Milne Point Unit
WFJ J : MPS-1?
API NO:
8P Exp!oration (Alaska)
REFERENCE INFORMATION SURVEY PROGRAM Plan; MPS-12Ll wpO I (plan MPS-I2IPlan MPS-12LI
Co-<xdinale (NIE) Relèreoce: Wen Centre: Plan MPS-I2, True Nor1h Dep<h Pm Depth To SurveylPlan Tool Created By: Ken Allen Date: I2I16/2()(
Vertical (1VD) Reference: S-Pad Dev 72.00
Sectioo (VS) Refereoœ: Slot - (O.ooN,O.ooE) 5327.00 8584.77 PIamed: MPS-'2LI "J'OI VI MWD+IFR+MS Checked: Date:
Measured Depth Refereoœ: S-Pad Dev 72.00
Calculation Methxl: Minimum CUrvature
Reviewed : Date:
WELL DETAll.S
Name +N'-S +F1·W No!Ihing Easling Lalìtode LoogiCUde SIo<
I wpOl Plan MPS-12 28.05 -42739 6000002.25 565917.42 70024'37.604N 149"27'47.698\V WA
otal Depth: 8584.77' MD, 4171' TVD
TARGET DETAILS
Name TVD +W-S +EJ·W Northing Easúng Shape
MPS-12L1 1'3 4159.00 405459 1892.61 6004073.00 567774,00 Point
MPS-12L1 T4 4171.00 447451 213435 6004495,00 568012.00 Point
MPS-12L1 T1 4181.00 3018.87 1618.44 6003035.00 567509.00 Point
8262.6' MD, 4156.89' TVD MPS-I2L1 poly 4202.00 1479.79 1943.90 6001499.00 567848.00 Polygon
Mps·12L1 1'2 4204.00 3704.10 171650 6003721.00 567601.00 Point
': 8099.83' MD, 4159'TVD SECTION DErAILS
7997.57' MD, 4169.26'TVD See MD Ine Azi TVD +N/~S +FJ-W DLeg TFaee VSee Target
I 5327.00 73.92 27.57 4151.02 1359.58 1635.51 0.00 0.00 1931.26
2 5347.00 76.24 26.93 4156.16 1376.76 1644.36 12.00 -15.00 1950,58
4195.73' TVD 3 5633.41 91.17 355.69 4188.26 1651.84 1698.21 12.00 -66.71 2222.04
4 5973.59 91.17 355.69 4181.30 1990.98 1672.64 0.00 0.00 2517.14
MD,4204'TVD 5 6002.91 90.00 357.00 4181.00 2020.24 1670.77 6.00 131.79 2542.74
6 7002.91 90.00 357.00 4181.00 3018.87 1618.44 0.00 0.00 3421.55 MPS-12Ll ~
7 7091.95 85.30 359.54 4184.65 3107.76 1615.75 6.00 151.67 3500.62 --
8 7242.89 85.30 359.54 4197.02 3258.19 1614.54 0.00 0.00 3635.88
9 7704.85 93.00 26.19 4204.00 3704.10 1716.50 6.00 74.37 4082.24 MPS-12Ll T2
10 7795.11 97.51 26.19 4195.73 3784.74 1756.16 5.00 0.05 4172.09
II 7997.57 97.51 26.19 4169.26 3964.84 1844.76 0.00 0.00 4372.79
12 8099.83 94.00 29.93 4159.00 4054.59 1892.61 5.00 133.20 4474.41 MPS-12Ll T3
13 8262.60 87.49 29.93 4156.89 4195.57 1973.77 4.00 -180.00 4636.59
14 8584.77 87.49 29.93 4171.00 4474.51 2134.35 0.00 0.00 4957.49 MPS-12Ll T4
97.02'TVD
CASING DETAILS FORMATION TOP DETAILS
TVD No. TVD MD Name Size No. TVDPath MDPath Formation
81 'TVD 4171.00 8584.76 41/2' 4.500 I 4151.00 5326.95 TSBD-OA
2 4174.00 5435.80 TSBC
All TVD depths are
ssTVD plus 72'for RKBE. -~
TVD
41 8 I.3'TVD
COMPANY DETAII.S
r Amoco
Míninun Cwvalm:
ISCWSA
T..v Cylinder North
Ðliplical + Casing
Rule. ß:ucd
CakuJalÎon Mc:thol
~r: ~k=~
Error Surface:
Wamil1! M<~hoo:
ö
4500
4000
3500
;::
o
Ë
+
:¡::
t:
~
:¡::
'5
o
en
I
3000
TVD
>,4151.02'TVD
I I I
2000 2500
West(-)/East(+) [500ft/in]
500
3000
500
2500
2000
') BP )
KW A Planning Report MAP
..çôøP~JÏŸ:
·J'1I~I~;. ....
$it~:< .... ... ..
··W~II:
:W~llp~t~:
~PAf;11.þqQ (.......... ......
. Milneppiri('.· · ..
MP~$:Þªø·· ..'... ; .
. pl~:lnMP$#12 ... /. ·
1::I,lál(tnfv1I::1$~j·?LJ. '...
12116/2Q02 . .. . T~~e: 1p:1'8:26 . .. . ... .Påge; 1
·(N~JÏÏeferente: ·WêlJ;AIï:1J1'MA$42;T"U.~.Nprth ,...
jª~(~Ï'ê~c~:. . . ... .S,ëF?Ø. . Q.. ,...... .......... ...........
.. .~...... .,.. .....,~ferel1è~:.,..·i..· .,.WØU. ..... ·,·pQE,29·P()~i) .
$~IT~yç:~ ~u. .~c)~~¢(~od:·· . ..... Miri¡ri1.µrhCürVatur~ . . ··Dh: ... draêl.ø '
Field: Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2002
Site: M Pt S Pad
Site Position: Northing: 5999978.00 ft Latitude: 70 24 37.329 N
From: Map Easting: 566345.00 ft Longitude: 149 27 35.171 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 0.51 deg
Well: Plan MPS-12 Slot Name:
Well Position: +N/-S 28.05 ft Northing: 6000002.25 ft Latitude: 70 24 37.604 N
+E/-W -427.39 ft Easting : 565917.42 ft Longitude: 149 27 47.698 W
Position Uncertainty: 0.00 ft
Well path: Plan MPS-12L 1 Drilled From: Plan MPS-12
Tie-on Depth: 5327.00 ft
Current Datum: S-Pad Dev Height 72.00 ft Above System Datum: Mean Sea Level
Magnetic Data: 12/12/2002 Declination: 25.66 deg
Field Strength: 57506 nT Mag Dip Angle: 80.81 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
0.00 0.00 0.00 25.50
Plan: MPS-12L 1 wp01 Date Composed: 12/12/2002
Version: 1
Principal: Yes Tied-to: From: Definitive Path
Casing Points
4.500
HoleSize
in
6.125
MD···.·
ft
8584.76
TVD
ftt
4171.00
Diameter
in
41/2"
Formations
1\1])
ft
5326.95
5435.80
TVD
ft
4151.00
4174.00
TSBD-OA
TSBC
DipOirectioll
deg .
0.00
0.00
Targets
MPS-12L1 T3 4159.00 4054.59 1892.61 6004073.00 567774.00 70 25 17.478 N 149 26 52.194 W
MPS-12L 1 T4 4171.00 4474.51 2134.35 6004495.00 568012.00 70 25 21.607 N 149 26 45.101 W
MPS-12L 1 T1 4181.00 3018.87 1618.44 6003035.00 567509.00 70 25 7.293 N 149 27 0.241 W
MPS-12L 1 poly 4202.00 1479.79 1943.90 6001499.00 567848.00 70 24 52.155 N 149 26 50.709 W
-Polygon 1 4202.00 1479.79 1943.90 6001499.00 567848.00 70 24 52.155 N 149 26 50.709 W
-Polygon 2 4202.00 1459.68 1616.68 6001476.01 567521.00 70 24 51.958 N 149 27 0.303 W
-Polygon 3 4202.00 3152.98 1381.59 6003167.00 567271.00 70 25 8.612 N 149 27 7.185 W
-Polygon 4 4202.00 3683.71 1533.29 6003699.00 567417.99 70 25 13.831 N 149 27 2.734 W
-Polygon 5 4202.00 4620.50 1910.61 6004639.00 567787.00 70 25 23.044 N 149 26 51.662 W
-Polygon 6 4202.00 4450.81 2327.17 6004473.00 568205.00 70 25 21.374 N 149 26 39.446 W
-Polygon 7 4202.00 3604.32 1802.63 6003622.00 567688.00 70 25 13.050 N 149 26 54.836 W
-Polygon 8 4202.00 3136.97 1721.49 6003154.00 567610.99 70 25 8.454 N 149 26 57.219 W
) BP )
KW A Planning Report MAP
0.02 .:i'imê: '1~:18:~ß(. > .' .... ... .~ag¢:' ,. 2· .
).Jt~fer~J):¢e: ::;~~!I:~11:\9M~$·'~;frl}eNq'1Þ.·
~~tf.'r~~ç~: ...$~fî~~8~~l?,g,,.· / ,.......;... .
t~r'wce:i. '.' .W~n~8.~qqN;9;0.pF;2$;50.,¥D. ..:
'önl\1e~ij(Jd;'" .... Miljiri1UmÇluYatur~ '. . .. . ;' Db:qråcla .','
Targets
MPS-12L 1 T2 4204.00 370.4.10 1716.50 600.3721.00 567601.00 70 25 14.032 N 149 26 57.361 W
Plan Section Information
.. Illtl .. .+NhS. +El~W·.· .:qÏJsl\~i~~.; .·T~"n Tf(t. T~.rget
Ø&9· '. ···ft· ··ff . ,.' deg/1oqftd~gI19oft; Øeg/1þ()ft d~g·
5327.0.0 73.92 27.57 4151.0.2 1359.58 1635.51 0..00 0.0.0 0.00 0.0.0.
5347.0.0 76.24 26.93 4156.16 1376.76 1644.36 12.00. 11.60 -3.20. -15.00.
5633.41 91.17 355.69 4188.26 1651.84 1698.21 12.00. 5.21 -10.91 -66.71
5973.59 91.17 355.69 4181.30 1990.98 1672.64 0..00 0.00 0.0.0 0.00
60.0.2.91 90.0.0. 357.0.0 4181.00 20.20.24 1670.77 6.00. -4.00 4.47 131 .79
7002.91 90.00. 357.00. 4181.00 30.18.87 1618.44 0..00. 0..00 0.00 0.00. MPS-12L 1 T1
7091.95 85.30. 359.54 4184.65 310.7.76 1615.75 6.00 -5.28 2.85 151.67
7242.89 85.30. 359.54 4197.0.2 3258.19 1614.54 0..00 0.00 0..0.0. 0..00.
7704.85 93.0.0. 26.19 420.4.00 370.4.10. 1716.50. 6.0.0 1.67 5.77 74.37 MPS-12L 1 T2
7795.11 97.51 26.19 4195.73 3784.74 1756.16 5.00. 5.00 0.00 0.05
7997.57 97.51 26.19 4169.26 3964.84 1844.76 0..00 0.00 0.0.0 0.00
8099.83 94.00. 29.93 4159.00 4054.59 1892.61 5.00. -3.44 3.65 133.20 MPS-12L 1 T3
8262.60 87.49 29.93 4156.89 4195.57 1973.77 4.00. -4.0.0 0.00. -180.0.0.
8584.77 87.49 29.93 4171.00 4474.51 2134.35 0.00. 0..00 0.00 0..00. MPS-12L 1 T4
Survey
1\-1D . ... .Inti ~im TVD SysTVJ) MapN MIlP~ VS DLS. ....... TFO Tool/C,onimel1t
·ft .. ~eg dl:l9 ft ft ft ift ft· ··Ø~gI1.oOft·dêg ...
5326.95 73.92 27.57 4151.00 4079.00 60.0.1376.0.4 567540.69 1931.21 0.0.0. 0.0.0 TSBD-OA
5327.00 73.92 27.57 4151.02 40.79.0.2 6001376.0.8 567540.71 1931.26 4.0.0. 298.09 MWD+IFR+MS
5347.0.0 76.24 26.93 4156.16 40.84.16 6001393.34 567549.41 1950.58 12.0.0 345.0.0 MWD+IFR+MS
5350..00 76.38 26.59 4156.87 4084.87 60.01395.95 567550.70. 1953.49 12.00. 293.29 MWD+IFR+MS
5375.0.0 77.59 23.77 4162.50 40.90.50 60.0.1418.0.8 567560.86 1977.85 12.0.0. 293.37 MWD+IFR+MS
540.0.00 78.82 20..98 4167.62 4095.62 6001440..79 567569.97 2002.28 12.0.0 294.0.0 MWD+IFR+MS
5425.00. 80.0.8 18.21 4172.19 4100.19 6001464.0.1 567578.0.1 2026.72 12.00 294.57 MWD+IFR+MS
5435.80 80..63 17.0.2 4174.00 4102.0.0 60.0.1474.18 567581.14 2037.26 12.0.0. 295.08 TSBC
5450.00. 81.37 15.46 4176.22 4104.22 60.0.1487.68 567584.94 20.51.11 12.0.0 295.28 MWD+IFR+MS
5475.00 82.67 12.73 4179.69 4107.69 6001511.74 567590.75 2075.38 12.0.0 295.53 MWD+IFR+MS
550.0..00 83.99 10..02 4182.60 4110.60 60.0.1536.12 567595.43 2099.45 12.0.0. 295.90. MWD+IFR+MS
5525.0.0. 85.32 7.32 4184.93 4112.93 60.01560..76 567598.96 2123.27 12.0.0 296.22 MWD+IFR+MS
5550..00 86.66 4.63 4186.68 4114.68 600.1585.58 567601.34 2146.77 12.00 296.47 MWD+IFR+MS
5575.0.0. 88.01 1.94 4187.84 4115.84 6001610..52 567602.55 2169.89 12.00 296.66 MWD+IFR+MS
560.0..00. 89.36 359.27 4188.42 4116.42 60.0.1635.50 56760.2.59 2192.56 12.0.0. 296.78 MWD+IFR+MS
5625.00. 90.72 356.59 4188.40 4116.40. 60.01660..47 567601.47 2214.72 12.00 296.85 MWD+IFR+MS
5633.41 91.17 355.69 4188.26 4116.26 6001668.86 567600.83 2222.04 12.00 296.84 MWD+IFR+MS
570.0.00. 91.17 355.69 4186.90 4114.90 60.01735.19 567595.24 2279.81 0..00 0..00. MWD+IFR+MS
580.0..00 91.17 355.69 4184.85 4112.85 60.0.1834.81 567586.84 2366.56 0.00. 0..0.0 MWD+IFR+MS
590.0.00. 91.17 355.69 4182.81 4110.81 60.0.1934.42 567578.45 2453.30. 0.0.0. 0..0.0 MWD+IFR+MS
5973.59 91.17 355.69 4181.30. 4109.30 60020.0.7.73 567572.27 2517.14 0.0.0 0..00 MWD+IFR+MS
60.0.2.91 90..0.0 357.00 4181.00 4109.0.0. 60.0.20.36.97 567570..14 2542.74 6.0.0 131 .79 MWD+IFR+MS
610.0..00. 90..0.0 357.0.0. 4181.00 410.9.00 6002133.87 567564.20. 2628.07 0.0.0 0..0.0 MWD+IFR+MS
620.0..0.0 90..0.0. 357.0.0 4181.00. 410.9.00 600.2233.67 567558.09 2715.95 0..0.0. 0..0.0. MWD+IFR+MS
630.0..00. 90.00 357.00 4181.00 4109.0.0 60.0.2333.4 7 567551.98 2803.83 0..0.0. 0.0.0 MWD+IFR+MS
640.0..0.0 90..0.0. 357.00 4181.00 4109.00. 60.02433.28 567545.86 2891.71 0.0.0. 0..0..0 MWD+IFR+MS
6500..00. 9.0.00. 357.0.0 4181.00 410.9.00. 60.0.2533.0.8 567539.75 2979.59 0.0.0. 0.00 MWD+IFR+MS
6600..00 90..0.0. 357.0.0 4181.0.0. 410.9.0.0 60.02632.88 567533.63 30.67.47 0.0.0. 0..0.0 MWD+IFR+MS
670.0...00. 9.0.00 357.00 4181.0.0 4109.00 6002732.69 567527.52 3155.35 0...00 0..00. MWD+IFR+MS
68.00.0.0. 9.0.0.0 357.00 4181.00. 4109.00 60.0.2832.49 567521.41 3243.23 0..00. .0.0..0 MWD+IFR+MS
, ". )
BP
I
KW A Planning Report MAP
. .":. ..::.... .
, ., '··Ti~e:'.·..'15;1~:4Qi/.··,/"..'."'.',·.,.,,·,.',¥ag~:.,. , ~.',.
W~!I:' ~,I~nM~$T'~/~W~~9rtt'.,
. '. ."'72';0,' ...... ,.,.' .,. ,... ..
. QN,9·qOÊ,~$;5q~i) 'Orå¢lê
hi .ÛmCurÿätµre ". . '"i)b:'
Survey
6900.00 90.00 357.00 4181.00 4109.00 6002932.30 567515.29 3331.11 0.00 0.00 MWD+IFR+MS
7002.91 90.00 357.00 4181.00 4109.00 6003035.00 567509.00 3421.55 0.00 0.00 MPS-12L 1 T1
7050.00 87.51 358.34 4182.02 4110.02 6003082.01 567506.67 3463.18 6.00 151.67 MWD+IFR+MS
7091.95 85.30 359.54 4184.65 4112.65 6003123.86 567505.53 3500.62 6.00 151.64 MWD+IFR+MS
7100.00 85.30 359.54 4185.31 4113.31 6003131.88 567505.39 3507.84 0.00 0.00 MWD+IFR+MS
7200.00 85.30 359.54 4193.51 4121.51 6003231.52 567503.71 3597.45 0.00 0.00 MWD+IFR+MS
7242.89 85.30 359.54 4197.02 4125.02 6003274.26 567502.99 3635.88 0.00 0.00 MWD+IFR+MS
7250.00 85.41 359.95 4197.60 4125.60 6003281.34 567502.90 3642.26 6.00 74.37 MWD+IFR+MS
7300.00 86.23 2.85 4201.24 4129.24 6003331.19 567503.68 3687.78 6.00 74.34 MWD+IFR+MS
7350.00 87.05 5.74 4204.17 4132.17 6003380.99 567506.98 3734.30 6.00 74.13 MWD+IFR+MS
7400.00 87.89 8.62 4206.38 4134.38 6003430.59 567512.78 3781.72 6.00 73.96 MWD+IFR+MS
7450.00 88.72 11.50 4207.86 4135.86 6003479.86 567521.08 3829.89 6.00 73.83 MWD+IFR+MS
7500.00 89.57 14.38 4208.60 4136.60 6003528.67 567531.84 3878.68 6.00 73.74 MWD+IFR+MS
7550.00 90.41 17.26 4208.61 4136.61 6003576.89 567545.05 3927.96 6.00 73.70 MWD+IFR+MS
7600.00 91.25 20.14 4207.89 4135.89 6003624.37 567560.66 3977 .60 6.00 73.70 MWD+IFR+MS
7650.00 92.09 23.03 4206.43 4134.43 6003671.00 567578.63 4027.46 6.00 73.74 MWD+IFR+MS
7704.85 93.00 26.19 4204.00 4132.00 6003721.00 567601.00 4082.24 6.00 73.83 MPS-12L 1 T2
7795.11 97.51 26.19 4195.73 4123.73 6003801.98 567639.95 4172.09 5.00 0.05 MWD+IFR+MS
7800.00 97.51 26.19 4195.09 4123.09 6003806.34 567642.05 4176.94 0.00 180.00 MWD+IFR+MS
7900.00 97.51 26.19 4182.02 4110.02 6003895.68 567685.02 4276.07 0.00 180.00 MWD+IFR+MS
7997.57 97.51 26.19 4169.26 4097.26 6003982.84 567726.94 4372.79 0.00 180.00 MWD+IFR+MS
8000.00 97.43 26.28 4168.94 4096.94 6003985.01 567727.99 4375.21 5.00 133.20 MWD+IFR+MS
8099.83 94.00 29.93 4159.00 4087.00 6004073.00 567774.00 4474.41 5.00 133.21 MPS-12L 1 T3
8200.00 89.99 29.93 4155.51 4083.51 6004160.17 567823.16 4574.20 4.00 180.00 MWD+IFR+MS
8262.60 87.49 29.93 4156.89 4084.89 6004214.68 567853.90 4636.59 4.00 180.00 MWD+IFR+MS
8300.00 87.49 29.93 4158.52 4086.52 6004247.22 567872.25 4673.84 0.00 0.00 MWD+IFR+MS
8400.00 87.49 29.93 4162.91 4090.91 6004334.23 567921.33 4773.45 0.00 0.00 MWD+IFR+MS
8500.00 87.49 29.93 4167.29 4095.29 6004421.24 567970.40 4873.05 0.00 0.00 MWD+IFR+MS
8584.77 87.49 29.93 4171.00 4099.00 6004495.00 568012.00 4957.49 0.00 0.00 MPS-12L 1 T4
)
)
Per Alaska Oil and Gas Conservation Commission Regulation 20 AA 25.005 Permit
to Drill sub section 14 (e) if a well has multiple well branches, each branch requires
a separate Permit to Drill. If multiple well branches are proposed from a single
conductor, surface or production casing, the applicant shall designate one branch as
the primary Well bore and include all inforn1ation required under (c) of this section
that is unique to that branch and need not include the $100 fee.
')
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME I'1f1S - /2 ¿ I
PTD# 20..]- 0.::> ~
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MUL TI
LATERAL
v
(If API number
last two (2) digits
are between 60-69)
"CLUE"
The permit is for a new wellbore segment of
existing well /l1J7S,- / ¿ ~ ~. '?ið
Permit NO,2cs3-02..3API No. S"c::S-Øz...7- 2.æ/..3 l'
Production should continue to be reported as
a function' of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit)~
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\jody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
/11//?¡
WELLPERMITCHECKLlST CÖMPANY Ar.x WELLNAME~/(- /2// PROGRAM: Exp_ Devl(Redrll_ Re-Enter _ Serv_ Wellboreseg~
. FIELD&POOLS?·S-/9(j INITCLASS LJ~ /.,J>ð// ~OLAREA K'7~ UNIT# //3"/~ ON/OFFSHORE,ad
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . Y @ ¥ /LJOf /'~ - 4/~.p cI:
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . rÿ'. N . . C-
3. Unique well name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. W ell located proper distance from drilling unit boundary. ... . Y N
6. W ell located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . }(~ N .
(Service Well Only) 13. Well located w(in area & strata authorized by injection order #_ Y /J-"'v ¡4
(Service Well Only) 14. All wells w/in X mile area of review identified. . . . . . . . . '. , N
ENGINEERING 15. Conductor string provided. . .. . . . . . . . . . . . . . . . '¥-N-
16. Surface casing protects all known USDWs. . . . . . . . . . Y N - "" J / L.
17. CMT vol adequate to circulate on conductor & surf csg. . . . . ,Y N II..(,//Ir
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . -¥-N ¡. ,I AJ
19. CMT will cover all known productive horizons, .. . ... . . .. . ~ SW)~··
20. Casing designs adequate for C, T, B & permafrost. . . . . . . N
21. Adequate tankage or reserve pit. . . . . . . . . . . . . . . . . .. N
22. If a re-drill, has a 10-403 fo~ abandonment been approved.. . . V /'tIlt-
23. Adequate wellbore separation proposed.. ...' . . . . . . . . . U/ N
24. If diverter required, doe,s ·it meet regulations. .. . . . . ... . ~ ^'-11r
25; Drilling fluid program schematic & equip list adequate. . . . . . N
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N
27. BOPE press rating appropriate; testto £fOGO psig. N
A- J 2ft Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
We; Z-/ if, ():š 29. Work will occur without operation shutdown. . . . . . . . . . . ~ N
. 30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . y·ŒJ IlL.
31. Mechanical condition of wells within AOR verified. . . . . . . .-¥-N "'¡It
32. Permit can be issued w/o hydrogen sulfide measures. . . . . ~
33. D8t. a present.ed on po.tential overpressure.zones. . . . . . . . Jr. . N /J )/7
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y / {/" ¡-7"
35. Seabed condition survey (if .off-shore). . . . . .. ...... Y. N
36. Contact name/phone for weekly progress reports. ...... N
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING
RP.cæ
APPR DATE
~¢É
APPR
DATE
(Service Well Only)
GEOLOGY
APPR DATE
~ßP ~Ó
. (Exploratory ö'nly)
Rev: 10/15/02
(
UIC ENGINEER
COMMISSIONER:
Commentsllnstructions:
TEM
JDH
JBR
COT
DTS [) '(!G1( OJ 3
MLB 0'2./0'¡-/D,J
SFD_
WGA /'
MJW
G:\geology\permits\checklist.doc
')
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Pennitting Process
but is part of the history file.
To improve the readability of the Well History file and to
sim,plify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
)
')
éi03-DaLj
{ /l.ot/9
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Fri Apr 11 15:51:16 2003
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name. ........... .LISTPE
Da te. . . . . . . . . . . . . . . . . . . . . 03/04:/ 11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD!MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-12 Ll
500292313960
B.P. Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
ll-APR-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW2309935000
J. STRAHAN
D. FERGUSON
MWD RUN 2
MW2309935000
J. STRAHAN
D. FERGUSON
MWD RUN 5
MW2309935000
B. ZIEMKE
D. FERGUSON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 6
MW2309935000
B. ZIEMKE
D. FERGUSON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3334
93
72.60
38.70
)
)
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
13.500
9.875
6.750
CASING
SIZE (IN)
20.000
10.750
7.625
DRILLERS
DEPTH (FT)
112.0
2240.0
5270.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY
(GM) UTILIZING
GEIGER-MUELLER TUBE DETECTORS.
4. MWD RUNS 2 and 6 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS; AND
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4). MWD RUN 6 ALSO INCLUDED
AT-BIT-INCLINATION
(ABI) .
5. MWD RUN 5 WAS DIRECTIONAL ONLY, TO ORIENT A
WHIPSTOCK IN THE MPS-12
WELLBORE. THE TOP OF THE WHIPSTOCK WAS AT ABOUT
5270'MD/4113'TVD AND
THE BOTTOM WAS AT ABOUT 5282'MD/4116'TVD. LOG DATA
OVER THIS
INTERVAL WERE ACQUIRED AT THE START OF MWD RUN 6.
6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 4/10/03. MWD DATA
ARE CONSIDERED
PDC.
7. MWD RUNS 1, 2, & 6 REPRESENT WELL MPS-12 L1 WITH
API#: 50-029-23139-60.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
8150'MD/4240'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
)
)
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
39.0
113.5
2230.5
2230.5
2230.5
2230.5
2230.5
STOP DEPTH
8096.0
8150.0
8103.0
8103.0
8103.0
8103.0
8103.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
5
6
MERGED MAIN PASS.
$
MERGE TOP
39.0
2250.5
5271.5
5299.0
MERGE BASE
2250.5
5271.5
5299.0
8150.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record........... ..Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
) ')
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 39 8150 4094.5 16223 39 8150
ROP MWD FT/H 0.08 1775.17 297.194 16074 113.5 8150
GR MWD API 11.74 145.47 70.6758 16115 39 8096
RPX MWD OHMM 0.63 2000 29.7285 11746 2230.5 8103
RPS MWD OHMM 1.02 2000 33.774 11746 2230.5 8103
RPM MWD OHMM 1.45 2000 38.8209 11746 2230.5 8103
RPD MWD OHMM 1.6 2000 44.0753 11746 2230.5 8103
FET MWD HOUR 0.06 39.87 0.578754 11746 2230.5 8103
First Reading For Entire File......... .39
Last Reading For Entire File.......... .8150
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type.... ........... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
39.0
113.5
STOP DEPTH
2178.5
2250.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
27-FEB-03
Insite
4.3
Memory
2250.0
112.0
2250.0
.1
1.3
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GM Dual GR
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type................ ..0
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD010
GR MWD010
TOOL NUMBER
72829
13.500
112.0
Spud Mud
9.30
143.0
8.5
600
9.6
.000
.000
.000
.000
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
)
.0
77.0
.0
.0
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 39 2250.5 1144.75 4424 39 2250.5
ROP MWD010 FT/H 25.9 1534.42 277.216 4275 113.5 2250.5
GR MWD010 API 16.85 145.47 71.0343 4280 39 2178.5
First Reading For Entire File......... .39
Last Reading For Entire File.......... .2250.5
File Trailer
Service name............ .STSLIB.002
)
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
F i 1 e Type................ LO
Next File Name.......... .STSLIB.003
physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type... . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPX
RPS
ROP
$
3
)
header data for each bit run in separate files.
2
.5000
START DEPTH
2179.0
2230.5
2230.5
2230.5
2230.5
2230.5
2251.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
5271.5
5271.5
5271.5
5271.5
5271.5
5271.5
5271.5
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
02-MAR-03
Insite
66.37
Memory
5270.0
2250.0
5270.0
.1
80.9
TOOL NUMBER
124724
103792
9.875
2240.0
LSND
)
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing....... ............. .60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Uni t s. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
9.30
82.0
8.5
400
6.0
3.500
2.550
4.700
3.500
72.0
101.2
72.0
72.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2179 5271.5 3725.25 6186 2179 5271.5
ROP MWD020 FT/H 21.56 1775.17 368.872 6042 2251 5271.5
GR MWD020 API 11.74 123.94 67.3134 6186 2179 5271.5
RPX MWD020 OHMM 1.64 1001.97 21.4244 6083 2230.5 5271.5
RPS MWD020 OHMM 1.43 2000 24.6369 6083 2230.5 5271.5
RPM MWD020 OHMM 1.45 2000 29.6332 6083 2230.5 5271.5
RPD MWD020 OHMM 1.6 2000 30.5375 6083 2230.5 5271.5
FET MWD020 HOUR 0.06 39.87 0.650671 6083 2230.5 5271.5
First Reading For Entire File......... .2179
Last Reading For Entire File.......... .5271.5
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
)
version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
ROP
$
4
)
header data for each bit run in separate files.
5
.5000
START DEPTH
5272.0
STOP DEPTH
5299.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
07-MAR-03
Insite
66.37
Memory
5299.0
5270.0
5299.0
77.8
77.8
TOOL NUMBER
62456
6.750
5270.0
Flow Pro
9.20
52.0
9.0
22000
5.2
.000
.000
.0
75.1
)
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.000
.000
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD050
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
Name Service Unit
DEPT FT
ROP MWD050 FT/H
Min
5272
0.08
Nsam
55
55
Max
5299
9.52
Mean
5285.5
6.06891
First Reading For Entire File......... .5272
Last Reading For Entire File.......... .5299
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.004
Comment Record
)
.0
.0
First
Reading
5272
5272
Last
Reading
5299
5299
)
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
GR
FET
ROP
$
5
)
header data for each bit run in separate files.
6
.5000
START DEPTH
5272.0
5272.0
5272.0
5272.0
5272.0
5272.0
5299.5
STOP DEPTH
8103.0
8103.0
8103.0
8103.0
8096.0
8103.0
8150.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
09-MAR-03
Insite
66.37
Memory
8150.0
5299.0
8150.0
77.9
92.4
TOOL NUMBER
62456
73634
6.125
5270.0
Flow Pro
9.25
55.0
9.5
20000
5.4
.230
.190
.200
.310
72.0
88.9
72.0
72.0
)
)
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5272 8150 6711 5757 5272 8150
Rap MWD060 FT/H 0.6 661.85 239.027 5702 5299.5 8150
GR MWD060 API 47.41 117.34 74.0861 5649 5272 8096
RPX MWD060 OHMM 0.63 2000 38.6484 5663 5272 8103
RPS MWD060 OHMM 1.02 2000 43.5887 5663 5272 8103
RPM MWD060 OHMM 4.47 2000 48.6899 5663 5272 8103
RPD MWD060 OHMM 5.28 2000 58.6171 5663 5272 8103
FET MWD060 HOUR 0.16 15.3 0.501504 5663 5272 8103
First Reading For Entire File......... .5272
Last Reading For Entire File.......... .8150
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name.. .
Version Number.......... .1.0.0
Date of Generation...... .03/04/11
Maximum Physical Record. .65535
File Type.... ........... .LO
Next File Name.......... .STSLIB.006
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name........... ..LISTPE
)
)
Date.................... .03/04/11
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File