Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-035 ·.1, RECEIVEU , 1J!)1 . STATE OF ALASKA .. ;:~ FEB ,0 AtÅ.~ OIL AND GAS CONSERVATION COM~ION Alaska Oil & ~~~fmÇ,~8mbJiiiIPN OR RECOMPLETION REPORT AND LOG / A h Revision' Status Change to Abandoned nc oraae 1 a. Well Status: o Oil o Gas o Plugged ~ Abandoned o Suspended o WAG 1 b. Well Class: 20AAC 25.105 20AAC25.110 ~ Development o Exploratory OGINJ OWINJ o WDSPL No. of Completions One Other o Stratigraphic o Service 2. Operator Name: 5. Date Comp., Susp., or A~t;I..1 12. Permit to Drill Number BP Exploration (Alaska) Inc. 11/212005 'j ¿ 203-03S~ 305-343 3. Address: 6. Date Spudded v 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 04/12/2003 . 50-02923141-60-00 /' 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: ~ 3375' NSL, 4714' WEL~ SEC. 07, T12N, R11E, UM :- 4/13/2003 MPS-01 L 1 Top of Productive Horizon: 8. KB Elevation (ft): 15. Field I Pool(s): 1575' NSL, 127' WEL, SEC. 06, T12N, R11 E, UM KBE = 72.5' " Milne Point Unit I Schrader Bluff Total Depth: 9. Plug Back Depth (MD+ TVD) 4229' NSL, 4442' WEL, SEC. 05, T12N, R11 E, UM (OA) 7200 + 4072 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 566077 ' y- 6000045 / Zone- ASP4 /10530 + 4410/ Ft ADL 028231 ~ TPI: x- 570618 y- 6003566 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 571548 y- 6006229 Zone- ASP4 N/A MD 18. Directional Survey DYes ~No 19. Water depth, if offshore 20. Thickness of Permafrost N/A MSL 1800' (Approx.) 21. Logs Run: MWD , LWD , PWD , RES, GR , GYRO, ABI/I FR I CASANDRA 22. CASING, LINER AND CEMENTING RECORD i~c~~;EG / SETTING DEPTH MD SETTING DEPTHTvD ..... cci i'i ........ i·, WfPER Fr. .... GrW,E. . Top BOTIOM Top BottOM "S'ZÊ .... 'I'<ECORD ... /. P;·"ì,;....· 20" 92# H-40 34' 112' 34' 112' 42" 260 sx Arctic Set (Aoorox.) 10-3/4" 45.5# L-80 35' 3140' 35' 2375' 13-1/2" 946 sx PF 'L' 275 sx Class 'G' 7-5/8" 29.7# L-80 33' 7685' 33' 4303' 9-7/8" 160 sx PF 'E' 293 sx Class 'G' 4-1/2" 12.6# 1-80 7663' 10243' 4296' 4388' 6-118" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 24. ·l. é'Ñéi~ ..... iCi ...... ········/.··.iJi·cii·.>A/i..iþ Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None None MD TVD MD TVD 25. .C·.· Ai: -> :,CEME~t'" ....... ¡,....,.... .·þ.þ,cþ· ·.ii.·jþii '>Ali ...... .. "'''''', , . SCANNED MAR 2 2 2007 DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Set Cement Retainer with 25 Bbls Class 'G", Squeezed 20 Bbls 'G' below and 5 Bbls 'G' on top Freeze Protected with 111 Bbls of Diesel. 26. PRODUCTION TEST . Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-BSl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED OIL -BSl GAs-McF WATER-BSl Oil GRAVITY-API (CORR) Press. 24-HoUR RATE'" 27. CORE DATA Brief ~escriptio~ of !ithology, por~sity, f~actures, apparent dips and presence of oil, gas or water (attach separa~~s~ Submit core chips; If none, state none. .'~ ~,,,.. .... '; None ~J~~ ¡ ~ . ._~._._¡ ~~~ - Form 10-407 Revised 12/2003 ORIG , CONTINUED ON REVERSE SI'RB[)t.fS 8Ft . ." 1_. r~ A L b MAn 2/f 2bt~2> ß J·¡b·07 ~?¡f~~ , 28. GEOLOGIC MARKER NAME MD TVD Top of Ugnu Zone B Top of Ugnu Zone BLower SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB TSBB-OB TSBB-OB TSBB-OB TSBB-OB 6954' 7060' 7365' 7369' 7400' 7407' 7420' 7447' 7458' 7470' 7487' 7603' 7696' 7833 8100' 8847' 9046' 10035' 1 0212' 3948' 4000' 4159' 4161' 4177' 4181' 4188' 4202' 4207' 4213' 4222' 4275' 4305' 4337' 4373' 4387' 4394' 4434' 4443' 29. RMA TION TESTS Include and brief! mmarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". None 30. List of Attachments: Summary of Daily Drilling Reports and a Well bore Schematic Signed 31. I hereby certify that the fore~oing is true and correct to the best of my knowledge. <6'"01 itle Technical Assistant MPS-01L1 Well Number 203-035 305-343 Permit No. I A roval No. Prepared By NameINumber: Drilling Engineer: Sandra Stewman, 564-4750 Adrienne McVey, 564-4184 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 1212003 Submit Original Only .Iœf4 4-1/16" - 5M FMC . Wellhead' 11" x 4.5" 5M Ge w/ 4.5" TCII T&B Tubing Hanger 4" CIW "H" BPV profile MPS-01 20" x 34" insulated, 215 #/ft A-53 ~ 103/4" 45.5 ppf L-80 BTRC (Drift ID = 9.794, cap. = .0961 bpI) 103/4" Super Seal II Float Shoe I 3140'1 75/8" 29.7 ppf, L-80, BTRC-mod production casing (drift ID = 6.750", cap. = 0.0459 bpf) 4.5",12,6#, L-80 IBT tbg. (cap. = .0152 bpf, íd =3.958) KOP @ 400' 53+ degree from 1950' Max hole angle = 68 degree @ 5060' 58 degree @ Sleeve < Cement retainer set @ 7200' ( 5 bbls of cement on top) .. Window in 7-5/8" Casing @ 7487' - 7499' Well Angle @ window = 60" Baker Hook Wall Hanger inside 7-S/8" Window 7482' Baker Hook Wall Hanger outside 7 -S/8" Window 7 499' NE Upper lateral Oríg. KB elav. = 72.50' (Doyon 14) or.. elev.= 38.30' (Doyon 14) Kill string @ 3,650' Top of Cement @ 7091' Baker Hook wall hanger pulled in half and milled up, Prior to the cement plug. 6 1/8" Hole td @ 11.075' I HES 4.S" Float shoe 11 ,00S' 80 jts. - 4 1/2" Slotted Liner 12.6# L-80 IBT (7,755'-11,002') Rat Hole 3D' Note' PXN Plug in XN-Nipple @ 7 578' Window in 75/8" Casing @ 7685' - 7697' Well Angle @ window = 73" Baker 6" Tie back sleeve Baker 7-S/8"x S1/2" ZXP Liner top pkr. Baker 7-S/8"x S1/2" HMC Liner hanger. 7,542' 7,550' 7,556' ,578' Baker Tie Back Sleeve 7662' Baker Hook Wall Hanger inside 7 -S/8" Window 7671' Baker Hook Wall Hanger outside 7 -S/8" Window 7697' 66 jts. - 4 1/2" R3 Slotted Liner 12.6# L-80 IBT (7,747'-10,199') Rat Hole 287' 61/8" Hole td @ 10,530'/ Btm Baker41/2" Guide Shoe 10,243' Baker Tie Back Sleeve 7885' Baker ZXP Liner Top Packer 7,892' Baker 7-5/8" x 5" HMC Liner Hanger 7,898' 7-5/8" Halliburton Float Coliar 8054' 7-5/8" Halliburton Float Shoe 8139' 61/8" Holetd @ 10,515'1 BtmBaker41/Z""V"FloatShoe 10.514' 60 jts. - 41/2",12.6# L-80, IBT OB lower Lateral Slotted Liner (8,117'- 10,512') DATE 04/16/03 10/21/03 7/3/06 COMMENTS Drilled & Completed Doyon 14 NE Lateral & Completed Doyon 14 ADD CEMENT ABOVE RETAINER REV. BY MDO MDO KDC MILNE POINT UNIT WELL 8-01 API NO: 50-029-23141-60 L2 API NO: 50-029-23141-60 L 1 API NO: 50-029-23141-00 BP EXPLORATION (AK) . Page 1 of 2 . Stewman, Sandra D From: McVey, Adrienne Sent: Tuesday, January 02,200710:12 AM To: Stewman, Sondra D Subject: FW: Sundry approval requirements for MPS-01 A Sondra, Here's the final word from Tom Maunder on the S-01A permitting requirements. When you have a moment, could you let me know what information we need for the 407's? I've never had to submit one before. -Adrienne From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Wednesday, December 27,20067:39 AM To: McVey, Adrienne Cc: Steve Davies; Steve McMains; Dave Roby Subject: Re: Sundry approval requirements for MPS-OIA Adrienne, We agree with what you propose. Submit 407's for the abandonment of the laterals and a sundry to re- enter the mainbore and prepare it for sidetrack. Call or message with any questions, Tom Maunder, PE AOGCC Thomas Maunder wrote, On 12/22/20067:56 AM: Adrienne, Good questions. I will check with my colleagues over here, I tend to agree with considering the laterals abandoned and filing one sundry to re-enter. I will get back to you. Tom Maunder, PE AOGCC McVey, Adrienne wrote, On 12/22/20067:44 AM: Tom, I'm the engineer for an upcoming Milne Point sidetrack, S-01 A, currently set to spud on January 24. I have a question regarding the required sundry approval(s). The original well, S-01, was a tri-Iateral. We attempted a rig workover on the well last October, which went very badly, and we ended up suspending the well; the lower two laterals are isolated by a packer assembly with a plug in the tailpipe, and we isolated the upper lateral by setting an EZSV retainer in the main wellbore and pumping cement below and above. We filed a separate sundry for each lateral (305-342, 305-343, and 305- 344), but the Type of Request for all 3 was marked as Suspend. It seems to me that the sundry for the main wellbore (305-342) should have indicated we'd suspended the well, and the other 2 should have been classified as abandonments. So, my question is: for re-entering the main wellbore and doing a cut-and pull sidetrack below the surface shoe (which will not affect the isolation below), what sundry approvals do we 1/3/2007 , . Page 2 of 2 . need? Do we need just one for re-entering a suspended well, or do we also have to file sundries to switch the status of the upper two laterals from suspended to abandoned? Please let me know if you have questions, Thanks! Adrienne McVey BP ACT Drilling 907 -564-4184 (office) 907-748-9865 (cell) m~\!~ªl@lm~otlJ 1/3/2007 &~_. ~~'<""&j """t"'t-'~'--' '.....& .""'1................,.......,..-.1 ..V" '0,..."-, VJ.!" Adrienne, We agree with what you propose. Submit 407's for the abandonment of the laterals and a sundry to re-enter the mainbore and prepare it for sidetrack. Call or message with any questions. Tom Maunder, PE AOGCC ~03..0S5 Thomas Maunder wrote, On 12/22/20067:56 A1\1: Adrienne, Good questions. I will check with my colleagues over here. I tend to agree with considering the laterals abandoned and filing one sundry to re-enter. I will get back to you. Tom Maunder, PE AOGCC c~ ~:> McVey, Adrienne wrote, On 12/22/20067:44 A1\1: Tom, I'm the engineer for an upcoming Milne Point sidetrack, S-01A currently set to spud on January 24. I have a question regarding the required sundry approval(s). The original well, S-01, was a tri-Iateral. We attempted a rig workover on the well last October, which went very badly, and we ended up suspending the well; the lower two laterals are isolated by a packer assembly with a plug in the tailpipe, and we isolated the upper lateral by setting an EZSV retainer in the main wellbore and pumping cement below and above. We filed a separate sundry for each lateral (305-342, 305-343, and 305-344), but the Type of Request for all 3 was marked as Suspend. It seems to me that the sundry for the main wellbore (305-342) should have indicated we'd suspended the well, and the other 2 should have been classified as abandonments. So, my question is: for re-entering the main wellbore and doing a cut-and pull sidetrack below the surface shoe (which will not affect the isolation below), what sundry approvals do we need? Do we need just one for re-entering a suspended well, or do we also have to file sundries to switch the status of the upper two laterals from suspended to abandoned? Please let me know if you have questions. Thanks! Adrienne McVey BP ACT Drilling 907 -564-4184 (office) 907-748-9865 (cell) mcvea1 @2bp,com of 1 12/27/2006 10:04 AM e e WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West ih Avenue, Suite 100 Anchorage, Alaska 99501 December 03, 2003 13[P/~ IOCr 11 RE: MWD Formation Evaluation Logs: MPS-Ol Ll+L2+L2 PB1, AK-MW-2355592 MPS-Ol Ll+L2+L2 PB~,JO 3-0.35 Digital Log Images: JO 3 - f un 50-029-23141-60,61, 71 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: {) If) 01 ['{~f' f~"---~-~ Signed· (, ~ olÖf t:£{lc ( ~ ,~ . 7J) -....-/' ALASKA!L AND ~~;~g~S~~:~ON COM!SION R ~~; ~~; 0 WELL COMPLETION OR RECOMPLETION REPORT AND LOG . c. C.,'.' Alaska on & GIS ons. ommSSlon Anchorage 1a. Well Status: D Oil DGas D Plugged D Abandoned 181 Suspended DWAG 1 b. Well Class: 20AAC 25.105 20AAC 25.110 181 Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions One Other D Stratigraphic D Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 11/2/2005 203-035 305-343 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 04/12/2003 50- 02923141-60-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 4/13/2003 MPS-01L1 3375' NSL, 4714' WEL, SEC. 07, T12N, R11E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 1575' NSL, 127' WEL, SEC. 06, T12N, R11 E, UM KBE = 72.5' Milne Point Unit I Schrader Bluff Total Depth: 9. Plug Back Depth (MD+ TVD) 4229' NSL, 4442' WEL, SEC. 05, T12N, R11 E, UM (OA) 7200 + 4072 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 566077 y- 6000045 Zone- ASP4 10530 + 4410 Ft ADL 028231 TPI: x- 570618 y- 6003566 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 571548 y- 6006229 Zone- ASP4 N/A MD -- - --- 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey DYes 181 No NI A MSL 1800' (Approx.) 21. Logs Run: MWD , LWD , PWD , RES, GR , GYRO, ABI I I FR I CASANDRA 2. CASING, LINER AND CEMENTING RECORD CASING q~ . tsETTlN(3UePTHMO tsETTlNGI IEPJ'H'\'VO ....ÓlE ,,'., ~NT. SIZE WT.PERFT. lOP BOTTOM lOP ¡BOTTOM SIZE ....""'.,... .. , PULLED 20" 92# H-40 34' 112' 34' 112' 42" 260 sx Arctic Set (Apcrox.) 10-3/4" 45.5# L-80 35' 3140' 35' 2375' 13-1/2" 946 sx PF 'L' 275 sx Class 'G' 7-518" 29.7# L-80 33' 7685' 33' 4303' 9-7/8" 160 sx PF 'E', 293 sx Class 'G' 4-1/2" 12.6# 1-80 7663' 10243' 4296' 4388' 6-1/8" Uncemented Slotted Liner 23. Perforations oRen to Production (MD + TVD of Top and 24. T JBlNG ... ,.. , Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None None MD TVD MD TVD 25. ~¢'Í), ,. ",,' "".-.,,-. !;To. ® 2Dfì~ DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 5tANNEC m:: C 1 :.,.1 .;,..ît:{, Set Cement Retainer with 25 Bbls Class 'G", Squeezed 20 Bbls 'G' below and 5 Bbls 'G' on top Freeze Protected with 111 Bbls of Diesel. 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BsL GAs-McF WATER-BsL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED + OIL-BsL GAs-McF WATER-BsL OIL GRAVITy-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None R8DMS BFl DEC 0 9ì 2005 I Form 10-407 Revised 12/2003 r CONTINUED ON REVERSE SIDE /' 28. ~ GEOLOGIC MARKERS NAME MD TVD Top of Ugnu Zone B Top of Ugnu Zone BLower SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB TSBB-OB TSBB-OB TSBB-OB TSBB-OB 6954' 7060' 7365' 7369' 7400' 7407' 7420' 7447' 7458' 7470' 7487' 7603' 7696' 7833 8100' 8847' 9046' 10035' 10212' 3948' 4000' 4159' 4161' 4177' 4181' 4188' 4202' 4207' 4213' 4222' 4275' 4305' 4337' 4373' 4387' 4394' 4434' 4443' ~ 29. i \-ORMATION TESTS Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state 'None". None 30. List of Attachments: Summary of Daily Drilling Reports and a Wellbore Schematic 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ....r ~~" ~ ~"'Ie Sondra þtewman IAf7'1\ ./ f/ þ ,""L - UII Technical Assistant 203-035 305-343 Permit No. I Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. MPS-01 L 1 Well Number Date IJ.. - Z -D5' Prepared By NamelNumber: Orillíng Engineer: Sandra Stewman, 564-4750 John Rose, 564-5271 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only BP EXPLORATION Operations Summary Report of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: 10/15/2005 Rig Release: 10/21/2003 Rig Number: 14 Spud Date: 3/25/2003 End: Date From - To Hours Task Code NPT Phase Description of Ope rations 10/20/2005 17:00 - 19:00 2.00 MOB P PRE Skid rig floor 19:00 - 20:00 1.00 MOB P PRE Move off MPS-10 20:00 - 22:00 2.00 MOB P PRE Work on rig moving system 22:00 - 23:00 1.00 MOB P PRE Move rig on MPS-1 23:00 - 00:00 1.00 MOB P PRE Skid rig floor and rig up 10/21/2005 00:00 - 04:00 4.00 RIGU P PRE Take on sea water, Rig up to 350 bbl waste circ tank. test lines to tank, and kill lines, pull BPV, rig Accept @ 0001 10/21/2005 04:00 - 04:30 0.50 RIGU P PRE Pre-spud meeting with crew 04:30 - 07:00 2.50 PULL P DECOMP Circ out with sea water and safe surf-o pills, thru tubing, taking returns up annulus thru choke to waste tank, 3 bbls min. 400 psi, 150 on annulus, starting pressure on tubing 200 psi, annulus 200 psi, bleed right off just gas. 07:00 - 08:00 1.00 RIGU P PRE Install TWC and test to 4500 psi, good test 08:00 - 09:00 1.00 RIGU P PRE Nipple down tree 09:00 - 11 :00 2.00 RIGU P PRE Nipple up BOPS 11 :00 - 16:30 5.50 RIGU P PRE Test BOPS and manifold to 250-3000 psi for 5 min. per test, hydril 250-2500 psi 5 min. per test, the right to witness test was wavier by John Crisp AOGCC, test was witness by WSL., Choke line valve failed 16:30 - 19:30 3.00 RIGU N SFAL PRE PJSM, Replace Choke line HCR valve 19:30 - 20:00 0.50 RIGU P PRE Finish BOP test, Tested HCR valve 250-3000 psi 5 min per test 20:00 - 21 :00 1.00 RIGU P PRE lay down test equipment, rig up stack tongs, pup 3 ft pup on Lubricator 21 :00 - 22:00 1.00 RIGU P PRE Pull TWC with lubricator 22:00 - 22:30 0.50 PULL P DECOMP Make up landing jt. pull hanger to floor, P/U wt 105K 22:30 - 23:30 1.00 PULL P DECOMP PJSM, Rig up floor to lay down Tubing, spooling unit, lay down hanger 23:30 - 00:00 0.50 PULL P DECOMP Laying down 12.6# L-80 IBT Tubing 10/22/2005 00:00 - 08:00 8.00 PULL P DECOMP Laying down 12.6# L-80 IBT Tubing, total 173 jts, 1 GLM, Phoenix pressure gauge, Sliding sleeve, jet pump and 3.5 cut jt. (tubing cut @ 7230.12) 08:00 - 08:30 0.50 PULL P DECOMP Clear floor, lay down spooling unit 08:30 - 09:30 1.00 PULL P DECOMP install test plug, test lower rams 250-3000 psi 5 min. per test, John Crisp wavier the right to witness test, test witness by WSL 09:30 - 11 :30 2.00 PULL P DECOMP Picking up Milling assem, #1,6 3/4 mill shoe,2 mill extension,boot basket,2 junk subs,bit sub,bumper sub,jars,shear out sub,9-dc,6 hw 11 :30 - 15:00 3.50 PULL P DECOMP Picking up 4" drill pipe out of shed 15:00 - 16:00 1.00 PULL P DECOMP Running drill pipe out of derrick 16:00 - 20:00 4.00 PULL P DECOMP Milling over packer @ 7242', with 127K PIU, 95K S/O, 105K RT, 70 rpms, 400 gpm, 1080 psi, mill 6" mill not acting right, 20:00 - 22:00 2.00 PULL P DECOMP POH to check mill assm. 22:00 - 23:00 1.00 PULL P DECOMP Stand back BHA, found 2.5' wide and 6'Iong and a .75 wide 6' long pieces in junk sub and lots of mill marks on outside of mill assm. one piece has part or order # on it 10050741, check clamps that was on tubing (don't match and we had the right count coming out of hole), call Baker shop and they don't have any thing with this # on it. we have something in hole with us above packer, (Clamp, something off phoenix gauge, or sliding sleeve ????) 23:00 - 00:00 1.00 PULL P DECOMP Picking up BHA #2, same as #1 but with 3 more DC 10/23/2005 00:00 - 00:30 0.50 PULL P DECOMP Picking up BHA #2 Printed: 111712005 9:57:36 AM e BPEXPLORATION Page 20f7 Ope.ratiøAs.Surnmary.··Report , . .. ...... Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: WORKOVER Start: 10/15/2005 End: Contractor Name: DOYON DRILLING INC. Rig Release: 10/21/2003 Rig Name: DOYON 14 Rig Number: 14 Date From;.To Hours Task Code NPT Phase Description of Operations 10/23/2005 00:30 - 02:00 1.50 PULL P DECOMP Rih to 7050' 02:00 - 03:30 1.50 PULL P DECOMP Slip and cut drilling line, service topdrive 03:30 - 04:00 0.50 PULL P DECOMP Rih to top of packer, pushing something from 7220' to 7242'. with 5-6K 04:00 - 05:00 1.00 PULL P DECOMP Mill over packer @ 7242 to 7244 with 75 rpms, 350 gpm, 900 I psi, packer turn loose and started down hole. 05:00 - 07:00 2.00 PULL P I DECOMP Push packer to 7324' , Circ bottoms up 07:00 - 10:30 3.50 PULL P DECOMP POH to BHA 10:30 - 11 :30 1.00 PULL P DECOMP Stand back BHA, lay down Burn shoe Assem. 11 :30 - 13:30 2.00 PULL P DECOMP Picking up BHA #3 overshot 13:30 - 15:30 2.00 PULL P DECOMP Rih to 7324' 15:30 - 16:00 0.50 PULL P DECOMP Tag packer push to 7458', Latch on to packer. 16:00 - 17:00 1.00 PULL P DECOMP Shear out circ. sub, with 2840 psi,circ bottoms up, with 500 I gpm, 2840 psi, flow check well 17:00 - 22:00 5.00 PULL P DECOMP POOH with packer to BHA 22:00 - 00:00 2.00 PULL P DECOMP Stand back BHA,lay down fishing assm.lay down packer and tail pipe assm., left slips and setting cones and packer rubbers in hole. 10/24/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP Pickup stack washer wash out stack 01 :00 - 03:00 2.00 PULL N DFAL DECOMP PJSM, picking up BHA #4 03:00 - 05:00 2.00 PULL N DFAL DECOMP Rih with reverse circ sub to 7400' 05:00 - 06:00 1.00 PULL N DFAL DECOMP Wash 7400 to 7482 set down on top of hook wall hanger, pick I up and turn pipe 1/2 turn, went by top of hook wall hanger to 7489' set down, top of window in key slot @ 7487' to 7499', I work pipe trying to work junk in window 06:00 - 10:00 4.00 PULL N DFAL ' DECOMP Mill on junk 7489' to 7493 with 40-50 rpms, 1-2K wt. 350 gpm 1650 psi, lost 600 psi pump pressure 10:00 - 12:30 2.50 PULL N DFAL DECOMP Flow check well,POH to BHA 12:30 - 14:30 2.00 PULL N DFAL DECOMP Stand back hwdp,collars, lay down 2 7/8 pipe jars,bumper sub,(Jeft reverse circ sub in hole, 5.69 ft.) 14:30 - 15:30 1.00 PULL N DFAL DECOMP Wait on fishing tools 15:30 - 16:30 1.00 PULL N DFAL DECOMP Pickup BHA # 5, overshot,bumper sub,oil jars,circ sub,12 dC,6 hwdp 16:30 - 18:30 2.00 PULL N DFAL DECOMP Rih to 7488, wash last stand to bottom, 200 gpm, 490 psi 18:30·19:00 0.50 PULL N DFAL DECOMP Engage fish push to 7493, Plu 144K, Slo 90k, RIt 112k, tq 5k 19:00 - 21:30 2.50 PULL N DFAL DECOMP POH to BHA 21 :30 - 23:00 1.50 PULL N DFAL DECOMP Stand back BHA back, lay down fish, found no metal in reverse circ. sub, fingers in side was broke off,reverse circ sub was bent starting about 2 ft up from mill 23:00 - 00:00 1.00 PULL N DFAL DECOMP Slip and cut drillline,service topdrive 10/25/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Finsh Cutting Drilling line 00:30 - 01 :30 1.00 PULL N DFAL DECOMP Picking up BHA #6, 4 5/8 mill,boot basket,boot basket,bit sub, bumper sub,oil jar,string magnet,xo sub, 12 dC,6 hwdp 01 :30 - 03:30 2.00 PULL N DFAL DECOMP Rih to 7409 03:30 - 05:00 1.50 PULL N DFAL DECOMP washed from 7409 to 7491, Mill on junk 7491 45 rpms, 500 gpm, 1500 psi, making no head way, acts like the mill is in bind, not milling on junk, quit rotating and put 25 k on mill started sliding went to 7498, picked up to 7480 pull15k over to pull mill thru, done this about 5 times making no head way, pull mill to depth of window of mother bore 7488-7489 let pipe rotate slow and pump 600 gpm 2000 psi P/U 144k, S/O 95, AfT 114k 05:00 - 08:30 3.50 PULL N DFAL DECOMP Circulate condition mud - GPM 600 - PP 2000 - PU 137 - SO Printed: 1117/2005 9:57:36 AM BPEXPLORATION Page 3 of7 Ope~ations..Sum.maI"yRep(¡)rt .... ..... Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: WORKOVER Start: 10/15/2005 End: Contractor Name: DOYON DRILLING INC. Rig Release: 10/21/2003 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 10/25/2005 05:00 - 08:30 3.50 PULL N DFAL DECOMP 90 - ROT 112 - TO 3.5 08:30 - 11 :00 2.50 PULL N DFAL DECOMP Flow check - POH from 7491' to BHA 11 :00 - 12:00 1.00 PULL N DFAL DECOMP Stand back HWT - DC's - Clean off magnet - Clean junk baskets - LD jar assembly 12:00 - 12:30 0.50 PULL N DFAL DECOMP Lubricate rig 12:30 - 13:30 1.00 PULL N DFAL DECOMP Wait on tools 13:30 - 14:30 1.00 PULL N DFAL DECOMP PJSM - MU BHA - 31/2' Mule shoe - 3 joints 3 1/2' DP - Junk baskets - Bumber sub - Jar - Magnet - Collars - HWDP 14:30 - 16:30 2.00 PULL N DFAL DECOMP RIH from 716' to 7482' 16:30 - 21 :00 4.50 PULL N DFAL DECOMP Attempt to work through liner - No success - Rotate string 60 rpm work through liner top - Con't wash down from 7482' to 7531' - GPM 700 - PP 2800· TO 10 - RPM 60 - PU 170 - SO 80 - ROT 120· Bottom out on HR profile in upper NE Lateral - Pump 3 - 40 bbl sweeps - GPM 700· PP 2800 - Lots sand back 1st sweep - 2nd sweep about half as the first - 3rd sweep no sand back - Hole appears clean 21 :00 - 23:30 2.50 PULL N DFAL DECOMP Flow check· Well static - POH from 7531' to BHA @ 716' 23:30 . 00:00 0.50 PULL N DFAL DECOMP Stand back HWDP - Collars 10/26/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP Con't clean out junk baskets - (No recovered junk) - LD magnet . (No Junk recovered off magnet) - Jars assy - Moblize Baker cutter assy to rig floor 01 :00 - 02:00 1.00 PULL N DFAL DECOMP MU cutter assy - MU BHA 02:00 - 03:30 1.50 PULL N DFAL DECOMP RIH from 605' to 7422' 03:30 . 05:00 1.50 PULL N DFAL DECOMP Establish cutting parimeters @ 7422' - RPM 30 TO 5· PU 155 - SO 93 - ROT 117 - RIH to 7496' Could not pass - Rotate string down to 7508' - Work string from 7508 to 7512' 05:00 - 06:00 1.00 PULL N DFAL DECOMP Cut 41/2" tubing @ 7510' - GPM 500 - PP 1100 - RPM 45 - TO 8300 - TO dropped to 7300 - Indicated tubing cut 06:00 - 08:30 2.50 PULL N DFAL DECOMP Flow check - Well static - POH from 7510' to 605' 08:30 - 09:30 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - Left 31/8" cutter assy and 3 7/8" stablizer in hole 09:30 - 11 :00 1.50 PULL N DFAL DECOMP Cut off drilling line - Top drive service - Moblize BHA 11 :00 - 12:00 1.00 PULL N DFAL DECOMP MU fishing tools - Overshot with grapple - Jar assy - DC's - HWDP 12:00 - 12:30 0.50 PULL N DFAL DECOMP RIH with pump out sub - Collars - HWDP 12:30 - 14:30 2.00 PULL N DFAL DECOMP RIH from 611' to 7494' 14:30 - 15:00 0.50 PULL N DFAL DECOMP Attempt to engage fish - No success - PU 155 - SO 90 - ROT 112 - TO 6K 15:00 - 18:00 3.00 PULL N DFAL DECOMP POH from 7494' to 611' 18:00 - 18:30 0.50 PULL N DFAL DECOMP Stand back BHA - LD overshot - No fish retrieved 18:30 - 20:00 1.50 PULL N DFAL DECOMP MU spear assy - Jars - Collars - Accelerator jar - HWDP 20:00 - 22:00 2.00 PULL N DFAL DECOMP RIH from 595' to 7482' 22:00 - 22:30 0.50 PULL N DFAL DECOMP Engage hanger @ 7487' - Jared fish 3 times - Jar hanger free with 80K over string weight - PU 155 - SO 90 22:30 - 00:00 1.50 PULL N DFAL DECOMP POH from 7487' to 3750' 10/27/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP Con't POH with spear assy - from 3750' to 595' 01 :00 - 02:00 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - Recovered 8' fish - Top 8' of hanger assy - (2' of mother bore entry section on bottom of fish) - Appromximately 9' left in Mother bore 02:00 - 03:00 1.00 PULL N DFAL DECOMP LD Baker tools - Accelerator - Spear assy - Clear rig floor of extra tools 03:00 - 07:30 4.50 PULL N DFAL DECOMP Wait on tools from Deadhorse 07:30 - 08:00 0.50 PULL N DFAL DECOMP Moblize BHA to rig floor e Printed: 11/7/2005 9:57:36 AM e BP EXPLORATION Page 4 of 7 C>peratiønsSummary Report .... Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: WORKOVER Start: 10/15/2005 End: Contractor Name: DOYON DRILLING INC. Rig Release: 10/21/2003 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 10/27/2005 08:00 - 09:30 1.50 PULL N DFAL DECOMP MU Mills - Stablizers - Jars - DC's - HWDP 09:30 - 11 :30 2.00 PULL N DFAL DECOMP RIH with BHA # 11 - From 700 to 7347' 11 :30 - 12:00 0.50 PULL N DFAL DECOMP Establish drlg pari meters - Tag top of fish@ 7490' - PU 147 - SO 90 - ROT 112 - TO 5 - RPM 100 12:00 - 18:00 6.00 PULL N DFAL DECOMP Mill from 7490' to 7522' - RPM 95 - TO 8 - GPM 500 - PP 1790 18:00 - 19:30 1.50 PULL N DFAL DECOMP Pump sweep - CBU 4X - GPM 710 - PP 3240 PP - RPM 90- i TO 6K - Lot of fine metal - metal flakes - sand over shakers - I Well appeared to clean up after 4 bottoms up - Flow Check - I Well static 19:30 - 22:00 2.50 PULL N DFAL DECOMP POH from 7522' to 622' 22:00 - 23:00 1.00 PULL N DFAL DECOMP i BHA - LD mill - (Mill 80% worn on face - 1/16" out of gauge) - i Lots of fine metal on magnet - No metal was recovered in Junk baskets 23:00 - 00:00 1.00 PULL N DFAL DECOMP ! MU Reverse circ jet basket - Clean out assy 10/28/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP con't MU Reverse circ jet basket assy - MU DC's - HWDP 00:30 - 02:30 2.00 PULL N DFAL DECOMP ,RIH with Clean out assy - from 616' to 7422' 02:30 - 03:30 1.00 PULL N DFAL DECOMP I Cut drlg line - Top drive / blocks service 03:30 - 05:00 1.50! PULL N DFAL DECOMP I Fishing for junk / clean out from - 7522' to 7524' - GPM 500 - ! I PP 3380 - RPM 45 - TO 5.5 - PU 153 - SO 85 - ROT 110 - 05:00 - 08:30 3.50 PULL N DFAL DECOMP ! String hung up @ 7524' - Jar / work string free 08:30 - 12:00 3.50 PULL N DFAL DECOMP I Flow check - Well static - POH to BHA 12:00 - 13:00 1.00 PULL N DFAL DECOMP I Stand back HWDP - DC's - LD BHA - Jars - Boot baskets - Magnet - Stablizers - Jet basket 13:00 - 13:30 0.50 PULL N DFAL DECOMP : Clear rig floor of tools 13:30 - 15:00 1.50 EVAL N DFAL DECOMP I PJSM - Rig up to test BOP's 15:00 - 18:30 3.50 EVAL N DFAL DECOMP Testing BOP's - Annular 250 low 2500 high 5 mins each test- Top / Bottom VBR rams - Choke manifold - Manual Choke / Kill valves - HCR choke / Kill valves - Upper / Lower IBOP - Floor safety valves - Blind rams - 250 low 3000 high 5 mins each test - Performed Accumulator test - Valve #6 failed on choke ¡manifold - All other test were good - Test witnessed by WSL / I John Spalding with AOGCC 18:30 - 19:30 1.00 EVAL N DFAL DECOMP I Change out paddle and seat on valve #6 - Retested same - . Test good 19:30 - 20:30 1.00 EVAL N DFAL DECOMP RD testing equipment - Pull test plug - Install wear ring - Close annulus valves - Blow down choke manifold - Moblize BHA to rig floor 20:30 - 21 :30 1.00 PULL N DFAL DECOMP PJSM - MU Clean out assy - Mill - String mill - J-baskets - Magnet - DC's - HWDP 21 :30 - 00:00 2.50 PULL N DFAL DECOMP RIH from 603' to 7450' 10/29/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Wash down from 7450 - Taking weight @ 7497' - PU - Slack off tag with 2K rotate string fell off - Con't wash down to 7524' with out rotary - PU 153 - SO 90 - ROT 112 00:30 - 03:00 2.50 PULL N DFAL DECOMP Wash - Ream junk / sand from 7524' to 7543' - WOM 4 to 8 - RPM 60 - TO 6 - GPM 360 - PP 1300 - Stopped washing @ 7543' - No Indication top of liner - Slack off without rotary to 7545' taking weight 5K - PU work string down taking weight 5K I @ 7545' - PU shut down pump work string 4 to 5 times without pump taking weight 10K @ 7545' - Work string 3 times with pump taking weight 10K @ 7545' - Work string with rotary 25 RPM - Stack 10K weight @ 7545' - Torque smooth no spike- No erratic torque - No indication of top of liner other then taking weight at 2' below projected top Printed: 11f7/2005 9:57:36 AM BPEXPl..ORATION Page50f 7 OperatioASSl.ImmSr't¥·æepørt Legal Well Name: MPS-01 Common Well Name: MPS-01 Spud Date: 3/25/2003 Event Name: WORKOVER Start: 10/15/2005 End: Contractor Name: DOYON DRILLING INC. Rig Release: 10/21/2003 Rig Name: DOYON 14 Rig Number: 14 Date From - To Hours Task Code NPT Phase Description of Operations 10/29/2005 03:00 - 04:30 1.50 PULL N DFAL DECOMP Pump sweep - RPM 50 - TO 7K - GPM 450 - PP 1660 - PU / SO several more times - Tag up 7545' 04:30 - 07:30 3.00 PULL N DFAL DECOMP Flow check - Well static - POH from 7540' to 603' 07:30 - 09:00 1.50 PULL N DFAL DECOMP Stand back BHA - LD mill - String mill - Magnet - J-baskets - 1.50 I PULL Clean same - No Junk recovered 09:00 - 10:30 N DFAL DECOMP MU BHA - RIH with DC's / HWDP - With 4 3/4" mill assy - To clean out isolation hanger 10:30 - 13:00 2.50 PULL N DFAL DECOMP RIH from 633' to 7545' 13:00 - 18:00 5.00 PULL N DFAL DECOMP Mill from 7545' to 7565 - Tag XO - WOM 4 to 6 - RPM 75 - TO I on 11 - off 6 - GPM 300 - PP 1050 - PU 155 - SO 90 - ROT 112 I IDFAL 18:00 - 19:30 1.50 I PULL N DECOMP Circulate sweep around - GPM 360 - PP 1400 - RPM 45 - TO i I 7K - Flow check - Well static 19:30 - 22:00 2.50 I PULL N DFAL DECOMP POH from 7565' to 633' 22:00 - 23:00 1.00 I PULL N DFAL DECOMP LD 4 3/4" Clean out assy - Clean boot baskets - No Junk - No I junk marks on face of mill - 23:00 - 00:00 1.00 I PULL N DFAL DECOMP Clear rig floor - LD Baker fishing tools - Moblize BHA to rig floor I 10/30/2005 00:00 - 01 :00 1.00 I PULL N DFAL DECOMP MU 2 3/4" clean out assy - RIH with DC's - HWDP 01 :00 - 02:30 1.50 I PULL N DFAL DECOMP RIH from 624' to 7350' - (Time change 1 hr back) 02:30 - 03:30 1.00 I PULL N DFAL DECOMP Cut drlg line - Top drive service 03:30 - 05:00 1.50 PULL N DFAL DECOMP RIH tag up @ 7565 - Establish milling pari meters - GPM 76 - PP 1150 off - 1250 to 1300 on - PU 155 - SO 90 - RPM motor i 700 - Mill from 7565' to 7573' - Pump pressure increased to i I 1540 - Indication on top of prong - PU to 7570' I 05:00 - 06:00 1.00 I PULL N DFAL DECOMP Drop ball - Pump ball on seat to open circ sub - 18 spm @ I 1150 psi - Did not open 06:00 - 06:30 0.50 I PULL N DFAL DECOMP POH 10 stands - From 7570' to 6595' 06:30 - 07:00 0.50 PULL N DFAL DECOMP Pump @ 18 spm @ 1000 psi - Attempt to open circ sub - Did not open - Flow check - Well static 07:00 - 09:30 2.50 PULL N DFAL DECOMP POH from 6595' to 625' - Stand back BHA 09:30 - 10:30 1.00 PULL N DFAL DECOMP LD 2.79" Mill - MU 2 3/4" Shoe - RIH with BHA 10:30 - 13:00 2.50 PULL N DFAL DECOMP RIH from 630' to 7573' - Establish wash pari meters - PU 157 - SO 88 - GPM 76 - PP 630 13:00 - 15:00 2.00 PULL N DFAL DECOMP Wash over prong - from 7573' to 7579.5'- 15:00 - 17:00 2.00 PULL N DFAL DECOMP Drop 5/8" ball to open circ sub - Pump ball on seat - Open circ sub - Pump sweep to surface - GPM 230 - PP 1070 - Flow check - Well static 17:00 - 20:00 3.00 PULL N DFAL DECOMP POH from 7570' to 630' 20:00 - 21 :00 1.00 PULL N DFAL DECOMP Stand back DC's - HWDP - LD Mill - Motor - Boot baskets - Magnet - XO's 21 :00 - 22:00 1.00 PULL N DFAL DECOMP MU Overshot Assy - RIH DC's - HWDP 22:00 - 00:00 2.00 PULL N DFAL DECOMP RIH from 645' to 7200' 10/31/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Con't RIH to 7570' 00:30 - 02:00 1.50 PULL N DFAL DECOMP Break Circulation - Displace well to seawater - Pump 30 bbl sweep - 390 bbl seawater - spot 50 bbl perf pill on bottom - I BPM 11.5 - PP 2600 02:00 - 02:30 0.50 PULL N DFAL DECOMP Wash down @ 3 bpm - From 7576 to 7581' saw a small increase in pump pressure as overshot went over prong - Increase pump 10 BPM disk appered to shear @ 2900 psi - (Disk set to shear @ 3200) - Attempt to Pull prong 5K over - PU 155 - SO 90 02:30 - 03:00 0.50 PULL N DFAL DECOMP Flow check for 30 mins - Well static 03:00 - 03:30 0.50 PULL N DFAL DECOMP Pull 8 stands - @ 6800 Printed: 111712005 9:57:36 AM BP EXPLORATION Operations Summary Report Page 6 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 1 0/15/2005 1 0/21 /2003 14 Spud Date: 3/25/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 10/31/2005 03:30 - 04:00 0.50 PULL N DFAL DECOMP CBU - 7 BPM @ 920 psi - Flow check well 15 mins . Well static 04:00 - 06:00 2.00 PULL N DFAL DECOMP Blow down top drive - POH from 6800' to 645' 06:00 . 07:30 1.50 PULL N DFAL DECOMP Stand back BHA - No Fish recovered 07:30 - 08:00 0.50 PULL N DFAL DECOMP Rig service 08:00 - 14:30 6.50 PULL N DFAL DECOMP Wait on fishing tools 14:30 - 15:30 1.00 PULL N DFAL DECOMP MU BHA - MU JDC Hyd Overshot assy - RIH DC's - HWDP 15:30 - 18:30 3.00 PULL N DFAL DECOMP RIH from 651' to 7570' Fill pipe every 25 stands 18:30 - 20:30 2.00 PULL N DFAL DECOMP Attempt to engage prong - PU 145 - SO 90 - 16 spm @ 2080 psi - Wash from 7570' to 7578.6'· Tag with 10K down 100 psi PP increase - Expected top of prong 7573' . shut down pump· PU no overpull indicated - RIH tag 7982.4 without pump set down weight 10K - PU no over pull indicated - Monitor well - Well static - RIH tag up @ 7582.9' set down weight 15K without pump· PU no overpull indicated - RIH to 7582.4' set down 15K with 13 spm @ 1380 psi - Shut down pump - No overpull indicated - Pull 1 stand 20:30 - 23:00 2.50 PULL N DFAL DECOMP Monitor well - Well static· POH from 7500' to 646' 23:00 - 00:00 1.00 PULL N DFAL DECOMP ,Stand back HWDP - DC's - LD BHA 11/1/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Con't LD BHA - No recovery of prong 00:30 - 01 :00 0.50 PULL N DFAL DECOMP Clear rig floor of tools 01 :00 - 02:00 1.00 EVAL N DFAL DECOMP PJSM - Rig up Shlumberger E-Line 02:00 - 04:30 2.50 EVAL N DFAL DECOMP RIH with GRlCCI - Taking weight @ 7528' - Collar above window 7466' - Top window 7491 - Bottom window 7501 . Did not see collar below window @ 7507' - Work sting 2 to 3 times I no progress below 7528' . POH with tools 04:30 - 06:00 1.50 EVAL N DFAL DECOMP PU 4.0 Caliber/CCL-GR - RIH - Caliber stopped in window @ 7496 - POH LD Logging tools 06:00 - 06:30 0.50 PULL N DFAL DECOMP RIH DC's· HWDP 06:30 - 08:00 1.50 PULL N DFAL DECOMP Slip and cut drlg line - Service Top drive 08:00 - 09:00 1 PULL N DFAL DECOMP Wait on Orders 09:00 . 09:30 0.50 PULL N DFAL DECOMP Moblize BHA to rig floor 09:30 . 10:00 0.50 PULL N DFAL DECOMP POH - HWDP - DC's 10:00 - 11 :00 1.00 PULL N DFAL DECOMP MU BHA 4314' Clean out assy 11:00-14:00 3.00 PULL N DFAL DECOIfAP RIH with clean out assy from 631' to 7440'- Establish milling parimeters· PU 140 - SO 95 - ROT 115 - GPM 365 - PP 1640· RPM 60 - TO 4 14:00 - 15:00 1.00 PULL N DFAL DECOMP RIH with pump from 7440' to 7531' 3K down wt fell off - Con't RIH to 7561 to 7566' taking 1 to 2K - Con't RIH to 7573 taking 3 to 5K - @ 7574' set down 10K - PU to 7565' - RIH to 7574' set down 10K - PU to 7567' - Rotate 60 RPM - TO 4 - Wash 1 Mill to 7581' WOM 2 to 3 - TO 3 to 4 - Pull up to 7448' - No Drag - Overpull 15:00 - 16:00 1.00 PULL N DFAL DECOMP Pump sweep around - Fine black to gray sand - Minimum metal 16:00 - 16:30 0.50 PULL N DFAL DECOMP RIH from 7448' to 7583 - Set down 15K - PU to 7573' - Wash from 7573 to 7584 . WOM 15K - RPM 60 - TO 5K - GPM 365 - 0.50 ¡ PULL PP 1600 - PU to 7573 16:30 - 17:00 N DAFL DECOMP Pump sweep around - Fine black to gray sand - small amount metal off magnet's 17:00 - 19:30 2.50 PULL N DFAL DECOMP Mill from 7584 to 7586 - WOM 15 RPM 60 - TO 5.5 to 6 . GPM 365 - PP 1630· Circulate @ 7561' - GPM 365 - PP 1600 - RIH to 7585' - Wash and mill from 7585 to 7594 . RPM 60 - GPM 365 PP 1630- Printed: 1117/2005 9:57:36 AM · e BP EXPLORATION Operations Summary Report Page 7 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 10/15/2005 10/21/2003 14 Spud Date: 3/25/2003 End: Date Frorn- To Hours Task Code NPT Phase Description of Operations 11/1/2005 17:00 - 19:30 2.50 PULL N DFAL DECOMP 7585 to 7586 - 21 mins - WOM 3 to 5 - TO 5 to 6 7586 to 7587 - 16 mins - WOM 3 to 5 - TO 5.5 to 6.5 7587 to 7588 - 21 mins - WOM 3 to 5 - TO 6 to 7 7588 to 7590 - 7 mins - WOM 3 to 10 - TO 6.5 to 7.5 7590 to 7591 - 8 mins - WOM 10 - TO 7 7591 to 7592 - 7 mins - WOM 10 - TO 7.3 7592 to 7593 - 8 mins - WOM 10 - TO 7.3 7593 to 7594 - 7 mins - WOM 10 - TO 7.3 19:30 - 21:00 1.50 PULL N DFAL DECOMP Pump sweep around - Fine black gray sand back - small IN amount metal off magnet's - Flow check - Well static 21 :00 - 23:00 2.00 PULL DFAL DECOMP POH from 7594 to 631' 23:00 - 00:00 1.00 PULL IN DFAL DECOMP LD - HWDP - DC's 11/212005 00:00 - 00:30 0.50 PULL IN DFAL DECOMP LD - 4 3/4" Clean out assy 00:30 - 01 :00 0.50 PULL N DFAL DECOMP Clear rig floor 01 :00 - 01 :30 0.50 T A N DFAL ASAN MU Howco 7 5/8" 29.7# Cement retainer 01 :30 - 05:00 3.50 T A P ASAN RIH with retainer to 7200' 05:00 - 05:30 0.50 TA P ASAN Shut top rams - Perform injectivity test - 2 bpm 870 psi pumped 20 bbls 05:30 - 06:00 0.50 T A P ASAN Set retainer @ 7200' - Test casing to 2050 psi for 5 mins - Test good - Recheck injectivity 2 bpm @ 900 psi pumped 18 bbls 06:00 - 06:30 0.50 T A P ASAN Rig up cementing line - Slow down top drive 06:30 - 08:00 1.50 CEMT P ASAN Pump 5 bbls H20-test lines to 3500 psi- Pump 25 bbls 15.8# class "G" cement- 5 bbls H20- Displace cmt. w/ rig pump 43.6 bbls. 5 bpm 500 psi taking returns through choke- Sting into retainer- Squeeze 20 bbls cmt. w/2bpm 850 psi- Unsting & pull 5 stands slowly to leave 5 bbls cmt. on top of retainer. 08:00 - 08:30 0.50 TA P ASAN Pump 40 bbl nutplug sweep around to clean DP- Reciprocate 90' while pumping 12 bpm 08:30 - 14:00 5.50 T A P ASAN POH- Lay down 4" DP 14:00 - 15:00 1.00 TA P ASAN Clear rig floor - Mobilize casing equipment - Rig up to run tubing 15:00 - 15:30 0.50 T A P ASAN Rig Service 15:30 - 19:00 3.50 RUNCm p ASAN PJSM - Run 4 1/2" kill string to 3650' - MU Tubing hanger - 88 joints total ran 19:00 - 19:30 0.50 RUNCm p ASAN RIH Land hanger - RILDS 19:30 - 20:00 0.50 EVAL P ASAN Test casing to 2050 psi - Hold for 30 mins - Record on chart - Test good 20:00 - 20:30 0.50 WHSUR P ASAN Install TWC - Test to 1500 psi - Test good 20:30 - 22:00 1.50 SOPSUF P ASAN PJSM - Slow down choke - LD casing equipment - Nipple down SOP's 22:00 - 23:30 1.50 WHSUR P ASAN PJSM - Nipple up adapter / tree - Test adapter to 5000 for 10 mins - Good test 23:30 - 00:00 0.50 WHSUR P ASAN RU to test tree 11/3/2005 00:00 - 01 :00 1.00 WHSUR P ASAN Test tree to 5000 psi - Test good - Pull TWC 01 :00 - 01 :30 0.50 WHSUR P ASAN PJSM - RU to freeze protect well 01 :30 - 03:00 1.50 WHSUR P ASAN Test lines to 2000 psi - Pump 111 bbls diesel down annulus - Take returns from tubing to pits - SPM 2 @ 420 psi 03:00 - 04:00 1.00 WHSUR P ASAN U-Tube freeze protection from annulus to tubing 04:00 - 06:00 2.00 WHSUR P ASAN Suck diesel from lines and tree top - Install SPV - Secure well - Release rig @ 06:00 hrs 11/3/2005 Printed: Ilnl2005 9:57:36 AM ~ 4-1/16" - 5M FMC Wellhead' 11" x 4.5" 5M GA wI 4.5" TCII T&B Tubing Ha~r 4" CIW "H" BPV profile 20" x 34" insulated, 215 lIft A-53 103/4" 45.5 ppf L-80 BTRC (Drift ID = 9.794, cap. = .0961 bpI) 103/4" Super Seal II Float Shoe I 3140' I 7 5/8" 29.7 ppf, L-80, BTRC-mod production casing ( drift ID = 6.750", cap. = 0.0459 bpf ) 4.5",12.6#, L-80 IBTtbg. (cap. = .0152 bpf, id =3.958) KOP @ 400' 53+ degree from 1950' Max hole angle = 68 degree @ 5060' 58 degree @ Sleeve Cernent retainer set @ 7200' ( 5' of cement on top) Window in 7-5/8" Casing @ 7487' - 7499' Well Angle @ window = 60° Baker Hook Wall Hanger inside 7-5/8" Window 7482' Baker Hook Wall Hanger outside 7-5/8" Window 7 499' Note: PXN PluQ in XN-Nipple @ 7.578' Window in 75/8" Casing @ 7685' - 7697' Well Angle @ window = 73° Baker Tie Back Sleeve 7662' Baker Hook Wall Hanger inside 7-5/8" Window 7671' Baker Hook Wall Hanger outside 7 -5/8" Window 7697' Baker Tie Back Sleeve 788S' Baker ZXP Liner Top Packer 7,892' Baker 7-S/8" x S" HMC Liner Hanger 7,898' 7-5/8" Halliburton Float Collar 8054' 7-5/8" Halliburton Float Shoe 8139' DATE 04/16/03 10/21/03 REV. BY MDO MDO COMMENTS Drilled & Completed Doyon 14 NE Lateral & Completed Doyon 14 I MPS 01í\ 1\\L.~Belev.= 72.50'(Doyon14) - I \ \.- ~L. elev.= 38.30' (Doyon 14) ~ NE Upper Lateral Kill string @ 3,650' Baker Hook wall hanger pulled in half and milled up, Prior to the cement plug. 61/8" Hole td @ 11,07S'/ HES 4.5" Float shoe 11,045' 80 jts. - 4 1/2" Slotted Liner 12.6# L-80 IBT (7,755'-11,002') Rat Hole 30' Baker 6" Tie back sleeve Baker 7-5/8"x 51/2" ZXP Liner top pkr. Baker 7-5/8"x 51/2" HMC Liner hanger. HES 3.5" XN-Nipple ( 2.750" No-Go) 5-1/2" Mule shoe I 7,595' I 7,542' 7,550' 7,556' 7,578' OA Lateral 66 jts. - 41/2" R3 Slotted Liner 12.6# L-80 IBT (7,747'-10,199') Rat Hole 287' 61/8" Hole td @ 10,S30'/ Btm Baker 41/2" Guide Shoe 10,243' 61/8" Hole td @ 10,S1S' / 8tm Baker 41/2" "V" Float Shoe 10,514' 60 jts. - 41/2",12.6# L-80, IBT OB Lower Lateral Slotted Liner (8.117'- 10,512') 'ï?rF liU," :,b," ~ ¡Lb· , , 11). r-\ ~ ¡n,I,IÞ 1ÆIß"~,, ij lu~ , ¡, ¿, J \:::::.,I U " , j e .f7'\ /A \ i Ü\ lJlj FRANK H. MURKOWSKI, GOVERNOR AIfASIiA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dan Kara Senior Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 - ..- . ~~¡pI~~ Re: MPS-01L1 Sundry Number: 305-343 Dear Mr. Kara: f\í; n'.~,' (,', l' C,' "DuG C:C I'\" ' J ", L SCANNtow' ,~j , '¥ Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. ,/ Ch DATED this+- day of November, 2005 Encl. ~ /~ mi4- 0,/ Gf'-r :or./" J e STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 \" f(', ;," NOV <-} ~" 1. Type of Request: 0 Abandon o Alter Casing o Change Approved Program III Suspend o Repair Well o Pull Tubing o Operation Shutdown 0 Perforate 0 Other o Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well o Perforate New Pool 0 Waiver 0 Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. ddress: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 5.=02 Number . API Number: 50-02923141-60-00 99519-6612 KBE = 72.5' 9. Well Name and Number: MPS-01 L 1 8. Property Designation: 10. Field / Pool(s): ADL 028231 Milne Point Unit / Schrader Bluff 11. Total Depth MD (ft): Total Depth TVD (ft): 10530 4410 Casin Len th Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): 10530 4410 7090 SÎze MD TVD Burst Junk (measured): None Colla se 78' 20· 112' 112' 1490 3105' 10-314" 3140' 2375' 5210 7652' 7-5/8" 7685' 4303' 6890 2580' 4-1/2" 7663' - 10243' 4296' - 4388' 8430 470 2480 4790 7500 Perforation Depth MD (ft): None (Below Plugs) Packers and SSSV Type: Perforation Depth TVD (ft): None Tubing Size: 4-1/2", 12.6# (Kill String) Tubing Grade: L-80 Packers and SSSV MD (ft): None Tubing MD (ft): 3655' 12. Attachments: 181 Description Summary of Proposal 0 BOP Sketch o Detailed Operations Program 14. Estimated Date for Commencing Operations: November 2, 2005 16. Verbal Approval: Date: 11/212005 Commission Re resentative: Tom Maunder 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Dan Kara Title Senior Drilling Engineer 13. Well Class after proposed work: o Exploratory 181 Development a Service 15. Well roposed work: o Gas DGINJ ~PIugged DWINJ o Abandoned o WDSPL Contact John Rose, 564-5271 Phone 564-5803 Commission Use O.,ly Prepared By Name/Number: Date I' 0) oS- Terrie Hubble, 564-4628 Sundry Number: Conditions of approval: Notify Commission so that a representative may witness o Plug Integrity o BOP Test o Mechanical Integrity Test o Location Clearance Other: RBDMS 8Ft g c~ 700J COMMISSIONER APPROVED BY THE COMMISSION Date IGINAL e e - bp L~J~· ;,:*l'Y 'f}ll. ,,', ~ ~" -.. To: Tom Maunder - AOGCC Date: November 3, 2005 From: John Rose - BPXA ACT Rotary Drilling Subject: MPS-01 (Well Suspension) On 11/02/2005, workover operations on MPS-01 were curtailed as the objectives of the workover were considered to be unachievable. Therefore, with verbal approval of the suspension from Tom Maunder with the AOGCC, well suspension operations were initiated on 11/01/2005 with the completion of those operations being on 11/03/2005. The suspension of the well included the plugging of the upper NE lateral of the well with a 20 barrel cement squeezed from below a retainer in the 7 5/8" main-bore casing at 7200' MD (5 bbls of cement (-100') were also placed above that retainer) while the lower two laterals (the OA and OB laterals) remained isolated by mechanical barriers which had been previously installed in the well. The cement plug was then pressure tested to 2050 psi for 30 minutes. MPS-01 was an Ugnu/Schrader Bluff tri-Iateral production well with laterals in the Schrader Bluff OB (the lower lateral), the Schrader Bluff OA (the middle lateral) and the Ugnu NE (the upper lateral). As the lower two laterals (OA & OB) were isolated by a packer assembly with a plug in the tail-pipe prior to drilling the upper lateral (NE) of the well in October of 2003, the intent of this recent workover was to remove the plug in the tail-pipe (the PXN plug in an XN nipple at 7578' MD) which would allow resumed production from the two lower OA and OB laterals of the well. In summary, as the workover progressed all attempts to access to the main-bore of the well below the upper lateral (as required to recover the plug in the tail-pipe at 7578' MD) proved to be unsuccessful due to what appears to be mechanical problems at the liner hanger for the upper lateral. It is generally concluded, that all of our clean-out work efforts were either diverted into the upper lateral or possibly to some open-hole sidetracking event. The deepest clean-out on our final run into the well (using a 4 %" mill assembly spaced-out below a 6 %" string mill) bottomed-out at 7592' failing to encounter any of the designed "no-go's" which would have been an indicator that we indeed had access to the main-bore of the well. That being the case, it was decided to suspend the well as detailed in this notice leaving the well above the suspension as a candidate for a future MPS-Pad sidetrack. (Note: A total of 3 Sundry notices will be submitted for the suspension of this well, one for each of the 3 laterals which are now isolated below the cement/retainer in the 7 5/8" casing in the main-bore of the well-7202'.) 4-1/16" - 5M FMC 11" x4.5" 5M Gen 6 TCII T&B Hanger 4" CIW "H" BPV profile II Window in 7-5/8" Casing@ 7487' - 7499' Well Angle @ window:: 60" Baker Hook Wall Hanger inside 7-518" Window 7482' Baker Hook Wall Hanger outside 7-518" Window 7499' Window in 75/8" Casing @ 7685' - 7697' Weil Angle @ window 73" Baker Tie Back Sieeve 7662' Baker Hook Wall Hanger inside 7-518" Window 7671' Baker Hook Wall Hanger outside 7-518" Window 7697' Baker Tie Back Sleeve 788S' Baker ZXP Liner Top Packer 7,892 Baker 7-518" x 5" HMC Liner Hanger 7,898' 7-5/8" Halliburton Float Collar 8054' 7-5/8" Halliburton Float Shoe 8139' Orig. KB elev. == Orig. GL. elev.== Cameo 4.5" xi" w/BK-5latch $idepocket KGB-2 GLM (Doyon 14) .30 (Doyon 14) KOP @ 400' degree from 1950' hole angle:: 68 degree @ 506 58 degree @ Sleeve Phoenix Oischarge gauge (3.850 ID) 4.5" HES XD Dura sliding sleeve NOTE: 10 change min. 2.840" Phoenix gauge ( 2.840" ID ) 4.5" x 3.5" X-Over Baker S-3 Perm. Packer 3,5" HES X-Nipple (2.813" ID) WLEG Rat Hole 30' RatHoie 287' ~ 4-1/16" - 5M FMC Wellnead: 11" x 4.5" 5M w/4.5" TCil T&S Tubing Hanger 4" CIW "H" SPV profile MPS..01 Current 20" x 34" insulated, 215 IIf! A-53 10 3/4" 45.5 ppf L-80 BTRC (Drift ID = 9.794, cap. = .0961 bpt) 10 3/4" Super Seal II Float Shoe 7518" 29.7 ppf, L-80, BTRC-mod production casing ( drift: 10 = 6.750", cap. = 0.0459 bpf) 14) 14) elelf, '" 72.50' GL. elev.= S8.30' KOP @ 400' 53+ degree trom 1950' Max hole angle =68 degree @ 5060' 58 degree @ Sleeve Base of Diesel 1ST Tubing Seawater (8.5 ppg) 5 bbl 15,8# class "G" cement - Howco EZSV Retainer Window in 7-5/8" Casing @ 7487' - 7499' Well Angle @window= 60" Baker Hook Wall Hanger inside 7-518" Window 7482' Baker Hook Wall Hanger outside 7-5/8" Window 7499' Window in 75/8" Casing @ 7685' - 7697' Well Angle @ window = 73° Baker Tie Back Sleeve 7662' Baker Hook Wall Hanger inside 7-5/8" Window 7671' Baker Hook Wall Hanger outside 7-5/8" Window 7697' OA Lateral 20 bbl 15.8# class "G" cement NE Upper Lateral 6 1/8" Hole tel @ 11 ,075' I HE$ 4.5" 66 jts. ·4 1/2" RS SlottEld Liner 12.6# L-80 1ST (7,747'-10,199') Rat Hole 287' 6 1/8" Hole tel @ 10,530' I Btm Saker 4112" Guide Shoe 10,243' Baker Tie Back Sleeve 7885' Baker ZXP Liner Top Packer 7,892' Baker 7-5113")( 5" HMC Liner Hanger 7,898' 7-5/8" Halliburton Float Coilar 8054' 7-5/8" Halliburton Float Shoe 8139' 1/8" Hole tel @ 10,515' I Blm Baker 41/2' "V" 60 jts. - 41/2",12.6# L-80, IBT OB lower Latera! Slotted LIner (8,117'- 10,512') DATE 04/16/03 10/21/03 11/03/05 COMMENTS Completed Doyon 14 eæl& 14 Doyon 14 e c... 's. T\,\~ ~\-~\~S ~~'-\\~ ¿Y«<è?Q-'\ö-'~'~\("~ \!"v\C"f ,\t<ê~)'\ò \Jé~\~c...\J~~. T\\~ 0?P((\ S<éc\\a~ö-.\ ,\~ \J~-l \ \~ (~~\('èS~~d \",~ O\)¿\\C3b\;· .k, S\~~ .\\ÚC\~. ~~ 0\- ~'~ \Cl~\()' \~ ,--0l \ \ \J E- q\íèctJ~e~ ", ~~.+~\~~~~~~~\C. _ ~..tt. ~'\C\\'\C.h:~ û.-\Cè .~~'>\~L~ ?> Ù':>,\,Q.~ . ~-\ ~'i 'Ð<2 ß\~~~~ ~ Cb~d (\ -\-~0 L Å ',' ~ ~ "-, \) ~ '..L q. L d-, ~~~~~O \j-.J~,,+\,-·~VxL\;~fbaœ '::>\JS~NJ(cJ, R ~ - \ ":> 0"'-.\'-. . -\ Ìì.~ d.:JJ I \_)-::tê~ ( ,,£+' I \.j~. ""0 ~ ~ ~f('.. \,.'" ., ,\' _,' rr-_ ( ù\",'%-.:B1ß~~~f\.c!d. A,. \1\ --z..6tt \)<t~c\\"'~ \ U( \O-..\.. ~ ~, '-C. I '-.\.J ~ , 6...\ ~~ h~~ Q.\--\\-...(2' ~ '\ '" \)-:¡l. \\ \x:,~. ~.,." \G. \\G'" Q \ClN). - \ ~ 'S ~ \ \,., "".\.\-.I:.. "':. .. .'. \, s ;\- ~ «.cr5>Sß. "". \\ f:\~\ <:."'''''~~ l :.-s"''\~(>.''-C..~ "1D <.J I\-'..\:~\--\-c-~~ ~,\\. \,0", Q~~ùJd, I ~'\ \ '-- S <L-\- <0-.'è:) 'S '-..'-.J c:.",. s,\:~\"s~c'\ ~~ \. ~.~~ ~ö....~.. ~ l(('1 _eJ~ -10~ J ~ Mv\ ~Jj~·r ! ' I DATA SUBMITTAL COMPLIANCE REPORT 5/10/2005 JÆu.¿ I:L k1p .44) API No. 50-029-23141-60-00 Permit to Drill 2030350 Well Name/No. MILNE PT UNIT SB S-01 L 1 Operator BP EXPLORATION (ALASKA) INC MD 10530 ---'TVD 4410.-- Completion Date 4/16/2003""'-- Completion Status 1-01L Current Status 1-01L UIC N ----------~------- REQUIRED INFORMATION Mud Log No Samples No ~ Directional S~ Yes~ DATA INFORMATION Types Electric or Other Logs Run: MWD, LWD, PWD, RES, GR, GYRO, ABI/IFRlCASANDRA Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name í-- I i ! ---------~-_.~-- úO" 0 d"'E 0 0 " !pt ~ ~',D ø' ,------ (data taken from Logs Portion of Master Well Data Maint) '- Log Log Run Scale Media No Interval OH / Start Stop CH Received Comments A Directional Survey Log is required to be submitted, This record automatically created from Permit to Drill Module on: 3/11/2003, MWd Directional Survey .11"1658 LIS Verification Directional Survey LIS Verification Directional Survey Directional Survey 7610 10530 Open 4/29/2003 45 10477 Open 4/29/2003 7610 10530 Open 4/29/2003 45 10477 Open 4/29/2003 7610 10530 Open 4/29/2003 7610 10530 Open 4/29/2003 Sample Interval Set Start Stop Sent Received Number Comments ...:~-~ Well Cores/Samples Information: MWd Name Well Cored? ADDITIONAL INFORMATION Y~ Daily History Received? ðJ/N G/N Formation Tops Chips Received? Y / N Analysis Received? ----- Comments: ~ DATA SUBMITTAL COMPLIANCE REPORT 5/10/2005 Permit to Drill 2030350 Well Name/No. MILNE PT UNIT SB S-01 L 1 Operator BP EXPLORATION (ALASKA) INC MD 10530 Completion Status 1-01L Current Status 1-01L TVD 4410 Completion Date 4/16/2003 Compliance Reviewed By: ~ Date: API No. 50-029-23141-60-00 UIC N I q M; LtK ~ ')---- ----- '----" 1. Status of Well 181 Oil 0 Gas D Suspended D Abandoned D Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3375' NSL, 4714' WEL, SEC. 07, T12N, R11E, UM At top of productive interval 1575' NSL, 127' WEL, SEC. 06, T12N, R11E, UM X = 570618, Y = 6003566 10. Well Number At total depth 4229' NSL, 4442' WEL, SEC. 05, T12N, R11 E, UM (OA) X = 571548, Y = 6006229 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff KBE = 72.5' ADL028231 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 4/12/2003 4/13/2003 4/16/2003 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 10530 4410 FT 10530 4410 FT 181 Yes D No 22. Type Electric or Other Logs Run MWD, LWD, PWD, RES, GR, GYRO, ABI/IFR/CASANDRA CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE 34' 112' 42" 35' 3140' 13-1/2" 33' 7685' 9-7/8" 7663' 10243' 6-1/8" 23. CASING SIZE WT. PER FT. 92# 45.5# 29.7# 12.6# 20" 10-3/4" 7-5/8" 4-1/2" ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Classification of Service Well 7. Permit Number 203-035 8. API Number 50- 029-23141-60 9. Unit or Lease Name X = 566077, Y = 6000045 Milne Point Unit MPS-01L 1 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) ..-r/IV~ 7¿.e.Ç"rhD t!3ô3/ ~ GRADE H-40 L-80 L-80 L-80 CEMENTING RECORD 260 sx Arctic Set (Approx.) 946 sx PF 'L', 275 sx Class 'G' 160 sx PF 'E', 293 sx Class 'G' Uncemented Slotted Liner AMOUNT PULLED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner MD TVD 7748'·10200' 4317'·4386' 27. Date First Production April 28, 2003 Date of Test Hours Tested 5/1/2003 2 MD TVD TUBING RECORD SIZE DEPTH SET (MD) 4-1/2", 12.6#, L-80 7485' 3-1/2",9.2#, L-80 7485' - 7554' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 507' Freeze Protected with 21 Bbls of Diesel. 25. PACKER SET (MD) 7498' PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR OIL-BBL TEST PERIOD 598 CHOKE SIZE GAS-OIL RATIO 525 Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE OIL-BBL GAs-McF 314 GAs-McF OIL GRAVITY-API (CORR) CORE DATA Brief description of lithology, porosity, fractures, apgªr~nt <:Iip'§,al1~, presence of oil, gas or water. Submit core chips. F~~-.Ãi~.~~.~, ~. ~,_~,~'..~;.~, RECEIVED \ .' ~ _t.~ 1 V¡::';~8"!' t, h~ - ,.. --'~'{ !, ~.~.ui~_.~/ MA Y 13 2003 I~I"'.:w¡f~~. .'~- .~~, ~_~·-",.,~I'~ l JII:"I....'"':o~J;~"~,'t~;:,;p;¡JM' Mð V 'i ~ 'ho(1 AlaSica otl & Gas Cons. Ga~ o RIG' N A _ And1~Ubmn In Duplicate 28. No core samples were taken. RBDNis Sf;- if 0; I:' ~orm 10-407 Rev. 07-01-80 WATER-BBL 2392 WATER-BBL 29. Marker Name Top of Ugnu Zone B Top of Ugnu Zone BLower SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE SBE1-NF TSBD-OA TSBC TSBB-OB TSBB-OB TSBB-OB TSBB-OB rSBB-OB ) Geologic Markers Measured Depth 6954' 7060' 7365' 7369' 7400' 7407' 7420' 7447' 7458' 7470' 7487' 7603' 7696' 7833' 8100' 8847' 9046' 10035' 10212' True Vertical Depth 3948' 4000' 4159' 4161' 4177' 4181' 4188' 4202' 4207' 4213' 4222' 4275' 4305' 4337' 4373' 4387' 4394' 4434' 4443' ') 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Integrity Test Summary. 32. I hereby certify that the fOregOing, is tru~ and correct to the best of my knowledge Signed r---J I ..t:r"·-'~·~ . .. ,C:::-, Sondra ~~ÎV"¿\...,·.~.;Ì",~:ï:"Å'J'--____.D!!.e Technical Assistant Date Û ) - I z.. -C)') MPS-01 L 1 203-035 Prepared By Name/Number: Sandra Stewman, 564-4750 Well Number Permit No. I Approval No. Drilling Engineer: Matt Green, 564-5581 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ) ') BP EXPLORATION Qperations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Date From..To Hours Task Code NPT Phasë 3/24/2003 18:00 - 20:00 2.00 MOB P 20:00 - 21 :30 1.50 MOB P 21 :30 - 00:00 2.50 MOB P 00:00 - 02:00 2.00 MOB P 02:00 - 06:00 4.00 RIGU P 06:00 - 18:00 12.00 DRILL P 18:00 - 19:00 1.00 DRILL P 19:00 - 20:00 1.00 DRILL P 20:00 - 20:30 0.50 DRILL P 20:30 - 21 :00 0.50 DRILL P 21 :00 - 21 :30 0.50 DRILL P 21 :30 - 22:00 0.50 DRILL P 22:00 - 23:00 1.00 DRILL P 23:00 - 00:00 1.00 DRILL P PRE PRE PRE 3/25/2003 PRE PRE SURF SURF SURF SURF SURF SURF SURF SURF SURF 3/26/2003 00:00 - 00:30 0.50 DRILL P 00:30 - 02:30 2.00 DRILL P 02:30 - 03:30 1.00 DRILL P 03:30 - 05:00 1.50 DRILL P 05:00 - 05:30 0.50 DRILL P 05:30 - 00:00 18.50 DRILL P SURF SURF SURF SURF SURF SURF 3/27/2003 00:00 - 09:00 9.00 DRILL P SURF 09:00 - 11 :00 2.00 CASE P SURF 11:00 -13:30 2.50 CASE P SURF 13:30 - 14:00 0.50 CASE P SURF 14:00 - 16:30 2.50 CASE P SURF 16:30 - 19:00 2.50 CASE P SURF 19:00 - 21 :00 2.00 CASE P SURF 21 :00 - 23:00 2.00 CASE P SURF 23:00 - 23:30 0.50 CASE P SURF Page 1 of 8 Start: 3/24/2003 Rig Release: 4/16/2003 Rig Number: Spud Date: 3/25/2003 End: 4/16/2003 DescriptionofOp~rations Install Top Drive Hose. Blow Down Rig Floor. Skid Floor to Moving Position. Move Rig From MPS-18i to MPS-01. Spot Rig over Well. Level & Shim. Slide Floor to Drilling Position & Rig Up Same. RIG ACCEPTED @ 02:00 HRS, 3/25/2003 Take on Water. Mix Spud Mud. NIU Diverter & Surface Riser. Load 5" DP into Shed. Spot Rockwasher & Sperry Shack. P/U 300 Jts. of 5" DP, 18 Jts. HWDP & 3 X 8" DC's - Stand Back in Derrick. Continue to Mix Spud Mud. Bring BHA Components to Rig Floor. MIU BHA# 1. Function Test Diverter. Performed Accumulator Test and Tested Combustable Gas & H2S Alarms. All Witnesed by John Spaulding, AOGCC. Install MWD I LWD Electronics, Orient & Adjust UBHO Sub. Pre-Spud Meeting with Co. Rep., Rig Crew, All Service Co. Personnel and Peak Drivers. RIU Sperry-Sun E-Line wI Gyrodata Surface Readout Tool. Fill Stack, Circulate Down Flow Line & Check for leaks. Test Surface Mud Lines to 3000 psi. Spud Well @ 112', Drill to 184'.405 GPM @ 990 psi. TQ = 1000 K P/U, SIO & ROT WT. All 65K. RPM = 60 WOB = 10K ART = 0.5 Hrs. Drill from 184' to 230'. Gyro Survey. Problems getting Survey tool to seat. Readings not consistant. Re-configure E-Line set-up & attempt again. Consistant Gyros - OK. Kick - Off Sliding from 230' to 274'. Stand Back 2 stands of HWDP. P/U 5 Flex Collars + Stabilizer. Take Last Gyro Survey @ 245' - No Problems. Directional Drill from 274' to 1839'. 430 GPM @ 1950 psi. Torque = 8000, WOB = 20 to 45K, RPM = 80 P/U = 107K, SIO = 97K, ROT = 102K AST = 10 Hrs. ART = 5 Hrs. Directional Drill from 1839' to 3155' - TD. 485 GPM @ 2530 psi. Tq. on Bottom = 10K, WOB 35 to 45K, 80 RPM. P/U = 115K, SIO = 95K, ROT = 106K ART = 3 Hrs. AST = 2.5 Hrs. Circulate 3+ Bottoms Up - Hole Clean. Pump out of Hole to HWDP @ 495 GPM, FCP = 1600 psi. RIH to 3145'. Wash last Stand to Bottom @ 3155'. No Fill. Circulate & Condition Mud & Clean Hole. Rotate @ 80 RPM while Reciprocating Pipe. Circulating @ 485 GPM @ 1900 psi. Pump out of Hole to HWDP @ 800' wI 485 GPM, FCP = 1600 psi. Shut Down Pumps & Continue POH, standing back HWDP. UD BHA # 1. Clear Floor. Rig UP to Run 10 3/4" Surface Casing. M/U Frank's Fill-Up Tool. Bring to Floor & RIU Long Bails, 350 Ton Spider & Elevators. PJsM wI Rig Crew & Casing Tong Operator. Printed: 412112003 2:36:36 PM ) ) BP EXPLORATION OperatiønsSummaryReport Page 2 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 3/24/2003 Rig Release: 4/16/2003 Rig Number: Spud Date: 3/25/2003 End: 4/16/2003 Date From ~ To Hours Task Code NPT Phase DescriþtiÖh.of·Operations 3/27/2003 23:30 - 00:00 0.50 CASE P SURF PIU Float Jts, Bakerlock & Check Floats - OK. 3/28/2003 00:00 - 02:30 2.50 CASE P SURF Run Total 76 Jts.- 10 3/4", 45.5#, L-80, BTC Casing. MIU Hanger & Landing Jt. Circulate Down to 3145' wI Hanger on Ring. 02:30 - 03:00 0.50 CASE P SURF Circulate Hole Clean. Condition Mud. 294 GPM @ 260 psi. Reciprocate w/1 0' Strokes. 180 UP 1125 Down. Hole Slick. 03:00 - 03:30 0.50 CASE P SURF RID Franks Tool, M/U HES Cement Head. 03:30 - 06:30 3.00 CASE P SURF Circulate & Condition Mud to a Vis of 47 with a YP of 8. Reciprocate w/1 0' Strokes. 180 Up 1125 Down pumping @ 294 GPM @ 180 psi. 06:30 - 10:00 3.50 CEMT P SURF Switch to Halliburton & Cement as per Program: Pump 5 Bbls Water & Test Lines to 3500 psi. Pump 15 BBls Water. Pump 50 Bbls., 10.3 ppg ALPHA Spacer @ 5 BBM. Mix & Pump Lead Slurry - 946 sx, 657 BBls PERMAFROST L Cement, 10.7 ppg. Yield of 4.15 cu ft I sx Reciprocating with no problems. Casing stuck 5' Off Bottom. When Lead Slurry seen at Surface: Mix & Pump Tail Sluury - 275 sx, 57 Bbls, Premium Cement w/2 % Calcium Chloride. Wt @ 15.8 ppg., Yield = 1.15 cu ft I sx. Clear HES Lines w/1 0 Bbls. Water & Switch to Rig Pumps. Displace wI 284 Bbls. 9.5 ppg Mud, pumping @ 6 bpm. Pressure from 550 psi. to 792 psi. Bumped Plug wI 1800 psi. 100% Returns Throughout Job. Shoe @ 3140'. Float Collar@ 3054'. 10:00 - 10:30 0.50 CEMT P SURF Bleed Off - Floats OK RID HES Cement Head. 10:30 - 12:30 2.00 CASE P SURF Flush Diverter & Riser, Clear Floor of all Casing & Cementing Equipment. N/D & Lift Diverter. 12:30 - 00:00 11.50 CASE N STUC SURF PJSM wI All Hands, Welder and FMC Rep. Set Emergency Slips with 225K Lbs. Tension. Cut Hole in Casing and let Drain. Measure, Mark & Cut Casing. Dress Same. Tack on Transition Head. Use Hot Head to Pre-Heat Casing & Transition Head. Weld Transition Head to Casing. Set off another Hot Head and Heat Transition Head to 800 Deg. Wrap Transition Head in insulation and allow to cool slowly for proper Temper. 3/29/2003 00:00 -10:30 10.50 CASE N STUC SURF Continue to Wait for Transition Head to Cool Down. Test Choke Manifold and TID Valves while Waiting. When Cool: Test Transition Head to 2000 psi. - OK 10:30 - 12:00 1.50 CASE P SURF Orient & N/U 20" X 11 ", 5M, Split Speed Head & 11" X 11 ", 5M Tubing Spool. Set on 135/8", 5M, BOP & Test Split Speed Head to 1000 psi as per FMC Tech. Rep. - OK. 12:00 - 13:30 1.50 CASE P SURF NIU 13 5/8", 5M, BOP & Assc. Equipment. 13:30 - 16:00 2.50 CASE P SURF Test BOPE 250 13500 psi, Annular 250 12500 psi. Witness waived by Jeff Jones, AOGCC. 16:00 - 18:00 2.00 CASE P SURF P/U & MIU BHA # 2. Surface Test MWD @ 270' - OK. 18:00 - 19:00 1.00 CASE P SURF TIH to 2970'. 19:00 - 19:30 0.50 CASE P SURF CBU wI 440 GPM @ 1630 psi. 19:30 - 20:30 1.00 CASE P SURF Pressure Test Casing to 2500 psi. for 30 Minutes on Chart. 20:30 - 21 :30 1.00 CASE P SURF Wash & Ream to Float Collar @ 3054'. Drill Float Collar, Soft Cement in Shoe Track and Float Shoe to 3140'. Clean out Rat hole to 3155'. Drill 20' of New Hole to 3175'. 21 :30 - 22:30 1.00 CASE P SURF Clean Hole & Balance Mud to 9.4 ppg, In & Out. Printed: 412112003 2:36:36 PM ) ) BP EXPLORATION OperatiORSSummaryReport Page 3 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 3/24/2003 Rig Release: 4/16/2003 Rig Number: Spud Date: 3/25/2003 End: 4/16/2003 Date From ~ To .. Höurs Task· Code NPT Phase DescriptionofOþerations 3/29/2003 22:30 - 23:00 0.50 CASE P SURF Perform Formation Integrity Test. Pressured up to 290 psi. w/ 9.4 ppg Mud. TVD of 10 3/4" Csg. Shoe is 2381' FIT = 11.74 ppg. EMW. 23:00 - 00:00 1.00 DRILL P INT1 Displace Well Bore with New, 8.6 ppg., LSND Mud while Drilling from 3175' to 3254'.Pumping w/444 GPM @ 1660 psi. ART = 0.25 Hrs. 3/3012003 00:00 - 00:30 0.50 DRILL P INT1 Drill from 3254' to 3349' While completing Mud displacement to New 8.6 ppg LSND Fluid. 00:30 - 01 :00 0.50 DRILL P INT1 CBU & Obtain Baseline ECD Readings & SPR's with New 8.6 ppg. LSND Mud. 01 :00 - 17:00 16.00 DRILL P INT1 Directional Drill from 3349' to 5988'. 510 GPM @ 2200 psi. TO = 9 to 11K, WOB = 20 to 40K, RPM = 100. P/U = 165K, S/O = 95K, ROT = 120K. 17:00 - 18:00 1.00 DRILL P INT1 Circulate Hole Clean. Clean Hole ECD = 9.53 ppg. ECD = 9.82 ppg. Pump @ 510 GPM -1650 psi. 100 RPM + Reciprocation. 18:00 - 20:30 2.50 DRILL P INT1 Pump Out of hole to Shoe @ 510 GPM, stopping every 5 Stands for Torque & Drag Readings. No Problems. 20:30 - 21 :00 0.50 DRILL P INT1 CBU @ Shoe. Considerable Cuttings over Shaker. 21 :00 - 21 :30 0.50 DRILL P INT1 TIH to 5988'. No FiII- Hole Slick. 21 :30 - 00:00 2.50 DRILL P INT1 Directional Drill from 5988' to 6362'.510 GPM @ 2300 psi. TO = 11 to 11.5K, WOB = 30 to 45K, RPM = 110. P/U = 166K, SIO = 98K, ROT = 125K. Total for Day: ART = 7.9 Hrs. AST = 2.1 Hrs. 3/31/2003 00:00 - 23:30 23.50 DRILL P INT1 Directional Drill from 6362' to 9030',510 GPM @ 2340 psi. TO = 12 to 16K, WOB = 20 to 40K, RPM = 100 to 110. P/U = 212K, SIO = 90K, ROT = 133K. Total for Day: ART = 9.25 Hrs. AST = 3.40 Hrs. @ 8590', Flow - Show indicated a 3% increase. Shut down Pumps and pulled off Bottom. Well was flowing slightly when checked - flow decreased then stopped with no appreciable gain. Mud @ Shakers cut by 1.2 ppg. Good oil shows over shakers throughout OA & OB. Increased Mud wt 0.1 ppg. to 9.3 ppg. Continued Drilling with no further problems. Increased Mud wt. to 9.5 ppg by 9000' as per program. 23:30 - 00:00 0.50 DRILL P INT1 Circulate Hole Clean. Pump @ 510 GPM /2240 psi. Reciprocating pipe w/1 00 RPM 4/1/2003 00:00 - 01 :30 1.50 DRILL P INT1 Circ Two bottoms up with 2240 psi 500 gals per min. 100 rpms, flow check on each bottoms up, well static. 01 :30 - 07:30 6.00 DRILL P INn Pumping out to 4388. with 500 gals min., hole taking too much fluid MW coming out 10# 07:30 - 08:30 1.00 DRILL P INT1 Circ bottoms up 08:30 - 10:00 1.50 DRILL P INT1 Pumping out to 3072 with 250 gals min. 10:00 - 11 :30 1.50 DRILL P INT1 Cut and slip drilling line 11 :30 - 13:30 2.00 DRILL P INT1 Tripping out to BHA 13:30 - 14:30 1.00 DRILL P INT1 Tripping out with BHA, change bit 14:30 - 18:00 3.50 DRILL P INT1 Download MWD and change out BHA and surface test MWD 18:00 - 20:00 2.00 DRILL P INT1 Tripping in picking up 78 jts of pipe, from pipe shed to 3,073 20:00 - 23:00 3.00 DRILL P INT1 Finish trip to bottom wash 90 ft to bottom, check shot @9020 MAD pass 9020 to 9030 23:00 - 00:00 1.00 DRILL P INT1 Directional Drill from 9030" to 9105',500 GPM @ 1950 psi. TO 16K, WOB 5k, RPM 100 rpm. AST .68 ART 0 4/2/2003 00:00 - 23:00 23.00 DRILL P INT1 Directional Drill from 9105" to 11340'. 500 GPM @ 2000 psi. Printed: 412112003 2:36:36 PM ) ) BP EXPLORATION Qperatiøns.Summary Report Page 4 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 3/24/2003 Rig Release: 4/16/2003 Rig Number: Spud Date: 3/25/2003 End: 4/16/2003 . Date From.. To Hours Task Code NPT Phase Description of Operations 4/2/2003 00:00 - 23:00 23.00 DRILL P INT1 TO 19 K, WOB 5k, RPM 100 rpm AST 9, ART 4.25 23:00 - 00:00 1.00 DRILL P INT1 Circ, three bottoms up with 500 gals per min. 2000 psi, 110 rpms 4/3/2003 00:00 - 03:00 3.00 DRILL P INT1 Circ, three bottoms up with 500 gals per min. 2000 psi, 110 rpms 03:00 - 11 :30 8.50 DRILL P INT1 Pumping out of hole with full drilling rate, to csg. shoe 3,140' 11 :30 - 13:00 1.50 DRILL P INT1 Trip out to BHA. 13:00 - 14:30 1.50 DRILL P INT1 Laying down BHA 14:30 - 16:30 2.00 DRILL P INT1 Clear floor, pick up 3.5 circ sub and 39 jts 3.5 drill pipe from pipe shed 16:30 - 19:30 3.00 DRILL P INT1 Tripping in with 3.5 stinger to 8376 19:30 - 20:00 0.50 DRILL P INT1 Rig up, Halliburton to pump Form-A -Plug 20:00 - 20:30 0.50 DRILL P INT1 Circ, with rig pump, PJSM on pumping plug 20:30 - 21 :30 1.00 DRILL P INT1 Pump 10 bbls 11.5 Wt. spacer, 20 bbls Form-a-plug, 10 bbls 11.5 wt. spacer, displace with rig pumps 118 bbls, pulled above plug to 8,256 slowly, while pumping last 3 bbls of plug 21 :30 - 22:30 1.00 DRILL P INT1 Circ. bottoms up 120 spm 1610 psi 22:30 - 00:00 1.50 DRILL P INT1 Tripping out to csg shoe @ 4,500 @ 2400 hrs 4/4/2003 00:00 - 01 :00 1.00 DRILL P INT1 Tripping out to csg shoe @ 3,140 01 :00 - 02:30 1.50 DRILL P INT1 Slip and cut drilling line, service top drive 02:30 - 04:00 1.50 DRILL P INT1 Trip in to 8,256' 04:00 - 05:00 1.00 DRILL P INn Circ and rig up to spot cement plug, PJSM 05:00 - 06:00 1.00 DRILL P INT1 Spotting open hole cement plug, with Halliburton 102 bbls, 496 sxs cement mixed @ 15.8, displace with 116 bbls mud, cement plug 8,256' to 7,424' 06:00 - 07:00 1.00 DRILL P INT1 Trip out to 7,401' with controlled speed 07:00 - 10:00 3.00 DRILL P INT1 Circ @ 7,401 @ 500 gals min. 10:00 - 12:00 2.00 DRILL P INT1 Tripping out to 4,775' 12:00 - 15:00 3.00 DRILL P INT1 Lay down execess 5" drill pipe and 3.5" stinger 15:00 - 21 :00 6.00 BOPSURP INT1 Pull wear ring, and install test plug, test BOPS and manifold 250-4,000 and Hydril 250-2500 for 5 min tests, no failures, the right to witness Bop test was wavier by Chuck Sheave AOOGC 21 :00 - 23:00 2.00 DRILL P INT1 Picking up BHA #4 with Bit 9 7/8 Secu rity FS2653 with 6-13 jets, 7" sperryDrill1.5 bend,float sub, sleeve stabilizer,6 3/4 GRlRES/PWD, 6 3/4 OM, hanger off sub,3 flex dc,jars,2 hwp 23:00 - 00:00 1.00 DRILL P INn Tripping into 3,140 4/5/2003 00:00 - 01 :30 1.50 DRILL P INT1 Test MWD tool, finish trip to 6,800' 01 :30 - 03:00 1.50 DRILL P INT1 Orient to low side and Open hole side tracking well @ 6,800' 03:00 - 05:30 2.50 DRILL P INT1 Time Drill from 6,800' to 6832'.500 GPM @ 1650 psi. 05:30 - 15:00 9.50 DRILL P INT1 Directional Drill from 6,832' to 8,150' TO. 500 GPM @ 1900 psi. WOB 10k, RPM 85 rpm. TO 15k, AST 3.75 ART 1 15:00 - 17:30 2.50 CASE P INT1 Circ three bottoms up with 525 gals min.1980 psi, 85 rpms 17:30 - 20:00 2.50 CASE P INT1 Pump out with full drilling rate, to 6250', tight hole from 7400 to 6800' dirty hole trying to packoff 20:00 - 21 :00 1.00 CASE P INT1 Tripping back to bottom, rotate and pumped across kickoff point 21 :00 - 00:00 3.00 CASE P INT1 Circ, four bottoms up with 525 gals min.1980 psi, 85 rpms 4/6/2003 00:00 - 00:30 0.50 CASE P INT1 Circ., four bottoms up with 525 gals min 1980 psi, 85 rpm 00:30 - 02:00 1.50 CASE P INT1 POH. Pump out with full drilling rate, to 6250', hole clean no drag. 02:00 - 03:00 1.00 CASE P INT1 Time change 03:00 - 03:30 0.50 CASE P INT1 Pump slug, blow down top drive Printed: 412112003 2:36:36 PM ) ) BP EXPLORATION OperationsSurnmaryAeport Page 50f 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 3/24/2003 Rig Release: 4/16/2003 Rig Number: Spud Date: 3/25/2003 End: 4/16/2003 Date From - To Hours Task Code NPT Phase Description·øf.Operations 4/6/2003 03:30 - 08:30 5.00 CASE P INT1 Laying down 5" drill pipe 08:30 - 10:00 1.50 CASE P INT1 Laying down BHA 10:00 - 11 :00 1.00 CASE P INT1 Tripping in hole with Drill pipe from derrick 11 :00 - 13:00 2.00 CASE P INT1 Laying down drill pipe 13:00 - 14:30 1.50 CASE P INn Pull wear ring, set test plug, C/O to 7 5/8, test door seals to 3,500 psi 14:30 - 16:30 2.00 CASE P INT1 PJSM, RlU CSG equip. pick up Franks fill-up tool 16:30 - 19:30 3.00 CASE P INT1 Run 7 5/8 29.70# L-80 BTC-mod CSG to 3,120' 19:30 - 20:30 1.00 CASE P INT1 Circ. bottoms up 20:30 - 00:00 3.50 CASE P INT1 Run 7 5/829.70# L-80 BTC-mod CSG to 8,000' 41712003 00:00 - 00:30 0.50 CASE P INT1 Run up 7 5/8 29.70# L-80 BTC-mod CSG to 8,137' total jts run 198. Shoe @ 8,137' float @ 8,054' pickup wt. 275,000, SIO wt. 90,000. 00:30 - 01 :00 0.50 CASE P INT1 Pick up Halliburton cementing head. Lay down Franks fill-up tool 01 :00 - 04:00 3.00 CASE P INT1 Circ., 7 bbl min 500 psi. , working csg 15 ft. strokes, P/U wt 255,000 SIO 90,000 PJSM on cementing 04:00 - 04:30 0.50 CEMT P INT1 Cement with Halliburton pump 5 bbls water, test lines 3500 psi, pump 30 bbl Alpha spacer, 62 bbl (160 sx). Permafrost E mixed @ 12.0 ppg, 64 bbl (293 sx) Premium cement mixed 15.6 ppg, drop top plug, kicked out with 10 bbls water. 04:30 - 05:00 0.50 CEMT P INT1 Displace cement with rig pumps 359 bbls mud at 7 bbl min. 500 psi, worked csg 15 ft strokes untill cement went around shoe, and then landed., Did not bump plug, Pumped 1/2 shoe jt. float helded. full returns tru out job 05:00 - 06:00 1.00 CEMT P INT1 Lay down landing jt.,RlD csg tools 06:00 - 07:00 1.00 CASE P INT1 Install 7 5/8 packoff assembly, test to 5,000 psi for 10 min 07:00 - 09:00 2.00 CASE P INT1 Change out top rams to 2 7/8x5" Variable ram, test door seals 09:00 - 11 :00 2.00 CASE P INT1 Change out top drive handler EQP. to 4" 11 :00 - 12:00 1.00 CASE P INT1 Clear foor and install wear ring 12:00 - 16:00 4.00 CASE P INT1 Picking up 4" drill pipe pick up total of 153 jts, pipe scaled up real bad. 16:00 - 17:00 1.00 CASE P INT1 Circ tru drill pipe to clean out scale. 8 bbls min 600 psi 17:00 - 18:00 1.00 CASE P INT1 POH stand drill pipe back in derrick 51 stands 18:00 - 23:30 5.50 CASE P INT1 Picking up 4" drill pipe pick up total of 231 jts 23:30 - 00:00 0.50 CASE P INT1 Circ tru drill pipe to clean out scale and cut and slip drill line 4/8/2003 00:00 - 01 :00 1.00 CASE P INT1 Circ tru drill pipe to clean out scale and cut and slip drill line 01 :00 - 03:00 2.00 CASE P INT1 Trip out to pickup BHA 03:00 - 05:30 2.50 CASE P INT1 Picking up BHA #5 Security FM2643, 5" speerydrill1.5 bend,float sub,DGRlRES, 4 3/4 DM HOC,hang off sub,3 flex dc"jars 05:30 - 08:00 2.50 CASE P INT1 Tripping into 8,016 08:00 - 09:00 1.00 CASE P INT1 Circ. bottoms up 09:00 -10:00 1.00 CASE P INT1 Test csg to 3500 psi for 30 min. good test 10:00 - 12:30 2.50 CASE P INT1 Drill cement float @ 8053 and shoe @ 8138, drill new hole to 8160 12:30 - 13:30 1.00 CASE P INT1 Displace new hole with 9.5 Flow-Pro mud 250 gpm 2150 psi 13:30 - 14:00 0.50 CASE P INT1 Drill 8,160' to 8,170' 14:00 - 14:30 0.50 CASE P INn FIT test, 9.5 mud wt, TVD 4378, 340 psi pressure,= 11.0 EMW, 14:30 - 00:00 9.50 DRILL P PROD1 Directional Drill 8,170 to 8974' with 245 gpm 2600 psi, 80 rpm AST 2.15 ART 4.5 4/9/2003 00:00 - 00:00 24.00 DRILL P PROD1 Directional Drill 8974' to 10,515' TD with 250 gpm 2700 psi, Printed: 412112003 2:36:36 PM ) ) BP EXPLORATION Operations ·SummaryRE)(Jort Page 6 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 3/24/2003 Rig Release: 4/16/2003 Rig Number: Spud Date: 3/25/2003 End: 4/16/2003 Date Frorn,0; 'fo Hours Task €ode NPT Phase Description of Operations 4/9/2003 00:00 - 00:00 24.00 DRILL P PROD1 80 rpm AST 8, ART 8.6 4/10/2003 00:00 - 02:30 2.50 CASE P COMP Flow checked well, Circ Three bottoms up, with 275 gals min 2800 psi, 100 rpms 02:30 - 05:30 3.00 CASE P COMP Pump out to 8,138 with full drilling rate, flow check well @ 8,138 05:30 - 08:30 3.00 CASE P COMP Tripping out for liner 08:30 - 09:30 1.00 CASE P COMP Down load MWD, Laying down BHA, bit in good shape 09:30 - 10:30 1.00 CASE P COMP PJSM and rig up to pickup 4.5 12.6# L-80 IBT Slotted Liner 10:30 - 13:00 2.50 CASE P COMP Picking up 4.512.6# L-80 IBT Slotted Liner 58 jts, 5 jts 4.5 12.6# L-80 IBT Solid Liner, with 2 centralizers per jt on slotted jts 13:00 - 16:00 3.00 CASE P COMP Tripping in with liner to tag bottom at 10,515 pick liner up 1 ft. to 10,514' 16:00 - 17:00 1.00 CASE P COMP Pumped 29/32 ball down with 3bbls min slowed to 1 bbl per min., set hanger with 2800 psi, set liner top packer with 3,100 psi, shear ball seat with 4,300 psi, rotated off with 20 turns to right, lost 10,000 # string wt., (top of liner 7,895' shoe 10,514') 17:00 - 20:00 3.00 CASE P COMP Tripping out with liner running tool, lay down same 20:00 - 21 :30 1.50 STWHIP P PROD2 Pickup 4 3/4 DC and HW pipe for whipstock run and stand in derrick 21 :30 - 00:00 2.50 STWHIP P PROD2 Picking up Seal assembly. 3.5 space out pipe and whipstock and mills and mwd tool. 4/11/2003 00:00 - 00:30 0.50 STWHIP P PROD2 Picking up whipstock BHA 00:30 - 04:00 3.50 STWHIP P PROD2 Tripping in with whipstock to 7,855 04:00 - 05:00 1.00 STWHIP P PROD2 Orient whipstock 10 degrees to left and set whipstock and shear off, top of whipstock 7,685 05:00 - 08:30 3.50 STWHIP P PROD2 Milling window, window 7,685 to 7,697' drill to 7,709' 08:30 - 10:30 2.00 STWHIP P PROD2 Pump Hi-Vis sweep, work window, circ Three bottoms up, stand back two stands drill pipe 10:30 - 12:00 1.50 STWHIP P PROD2 Slip and cut drill line, service top drive 12:00 - 14:00 2.00 STWHIP P PROD2 POH to BHA 14:00 -15:00 1.00 STWHIP P PROD2 Stand drill collars back in derrick and lay down mills 15:00 - 16:00 1.00 STWHIP P PROD2 Pick up Johnny Wacker and wash BOP stack, Function all rams. 16:00 - 20:30 4.50 BOPSUR P PROD2 Pull wear ring, Test BOPS and Manifold with 250-3500 psi 5 min. tests, Test Annular 250-2500 psi for 5 min. tests, Bop test was witness by John Crisp AOOGC., no leaks, good test 20:30 - 22:00 1.50 STWHIP P PROD2 Pickup BHA #7 Bit 6.125 Fm2643 w/3x12, 5" Sperrydrll1.50 bend ,float sub.,DGRlRes, 4 3/4 DM HOC,hand off sub, 3 flex dc, jars 22:00 - 00:00 2.00 STWHIP P PROD2 Trip in hole to 6,200' 4/12/2003 00:00 - 01 :00 1.00 STWHIP P PROD2 Trip in hole t07,680', Orient to high side and slide tru window with out pump., no problem 01 :00 - 00:00 23.00 DRILL P PROD2 Directional Drill 7,709' to 9,127' with 250 gpm 2350 psi, 80 rpm ART 5.35 AST 9.41 wall sticking"having trouble sliding, lower water loss to 4.0 from 4.6 , reduce the amount CACO from 7 sx hr to 5 sx per hr. 4/13/2003 00:00 - 17:30 17.50 DRILL P PROD2 Directional Drill 9,127' to 10,362' with 250 gpm 2650 psi, 80 rpm, RIT ahead 200 ft. per, sliding 30-50 ft. per hr. add 1.5% lub. with no noticable increase of ROP in drilling or sliding 17:30 - 18:30 1.00 DRILL P PROD2 Pump out to 10,210' MAD PASS 10,210 to 10,160', RIH 18:30 - 22:00 3.50 DRILL P PROD2 Directional Drill 10,362' to 10,530' TD as per geologist, with Printed: 4/21/2003 2:36:36 PM ) ) BP EXPLORATION Operations Summary Report Page 7 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 3/24/2003 Rig Release: 4/16/2003 Rig Number: Spud Date: 3/25/2003 End: 4/16/2003 Date From ~ To Hours Task Code NPT Phase Descri ptionofOperations 4/13/2003 18:30 - 22:00 3.50 DRILL P PROD2 250 gpm 2650 psi, 80 rpm AST 3.84 ART 11.31 TQ 4K P/U 125K S/O 90K RIT 105K 22:00 - 00:00 2.00 CASE P COMP Circ. Three bottoms up with 280 GPM 3,000 PSI 85 RPMS 4/14/2003 00:00 - 03:00 3.00 CASE P COMP Pump out from 10,530 to 7,685 top of window with full drilling rate, no problems 03:00 - 05:30 2.50 CASE P COMP Flow check, slug pipe , Tripping out to BHA 05:30 - 07:00 1.50 CASE P COMP UD BHA, down load MWD 07:00 - 08:00 1.00 CASE P COMP Pick up Retieving tool, orient RIH with DC and HW. Pluse test MWD 08:00 - 10:00 2.00 CASE P COMP RIH to 7,696 10:00 - 11 :00 1.00 CASE P COMP Orient and hook whipstock, pull free with 80,000 overpull 11 :00 - 14:00 3.00 CASE P COMP Tripping out with whipstock 14:00 - 16:30 2.50 CASE P COMP Lay down BHA and whipstock 16:30 -17:30 1.00 CASE P COMP Clear floor, rig up to run Csg, count pipe and PJSM 17:30 - 19:30 2.00 CASE P COMP Pickup up 1 bent jt,59 jts of slotted liner, 1 solid jt for a total of 61 jts 4.512.6# L-80 IBT liner with 2 centralizers per jt on slotted jts. 19:30 - 20:00 0.50 CASE P COMP Pickup Baker Hoor Wall hanger 20:00 - 22:00 2.00 CASE P COMP Tripping in hole with liner to 7,685 top of window 22:00 - 23:00 1.00 CASE P COMP Orient shoe jt to window, took 5 trys before we got out of window 23:00 - 00:00 1.00 CASE P COMP Trip in hole with liner, to 10,243, hooked hanger on bottom of window @ 7,697' top of liner @ 7,662, shoe 10,243 (287 ft from bottom) pickup wt. 132,000 slackoff 90,000 4/15/2003 00:00 - 01 :00 1.00 CASE P COMP Drop 29/32 ball. Pump down 3 bbls min slowed to 1 bbls min to bump. Release from liner with 3300 psi. Shear ball with 4500 psi. Pickup wt. 124,000 collet shear with 12,000 over pull. Pull one stand and monitor well 01 :00 - 02:00 1.00 CASE P COMP Cut and Slip Drilling Line, Service Top Drive, Pump Dry Job. 02:00 - 06:00 4.00 CASE P COMP Tripping out, lay down excess pipe 144 jts. 06:00 - 07:30 1.50 CASE P COMP M/U Perforated DP Pup & RIH to 7672' 07:30 - 08:00 0.50 CASE P COMP PJSM on C/U & Displacement of Brine. 08:00 - 10:00 2.00 CASE P COMP Displace to 9.4 ppg. Brine @ 10 BPM & 120 RPM. Shut Down & Monitor Well - Static. Displace to 9.7 ppg Corrosion Inhibited Brine. @ 10 BPM & 120 RPM. 10:00 - 13:00 3.00 CASE P COMP POH, Rack Back 50 stands, UD Remainder of DP. 13:00 - 14:30 1.50 RUNCOM=> COMP Pull Wear Bushing, Clear Floor, RIU Tbg & I-Wire Equipment. 14:30 - 15:00 0.50 RUNCOM=> COMP PJSM wI Crew and all Service Co. Personnel. 15:00 - 17:30 2.50 RUNCOM=> COMP M/U Packer Assy wI Phoenix Pump & Guage. Connect I-Wire to Pump & Guage. Function Test I-Wire & Phoenix Guage. 17:30 - 00:00 6.50 RUNCOM=> COMP Run 4.5" Completion string as per Program - 160 Jts Run. 4/16/2003 00:00 - 01 :00 1.00 RUNCOM=> COMP Run Total 179 Jts. 4.5",12.6#, L-80, IBT Tubing. Installed 96 Clamps. Final P/U Wt. = 105K, S/O Wt. = 85K Packer @ 7498', WLEG @ 7553' 01 :00 - 02:30 1.50 RUNCOM=> COMP M/U Tbg Hgr wI TWC Installed, Orient Penetrator, Thread I-Wire Through & Test. Land Hanger, Torque LOS, Test TWC from Below to 350 psi. 02:30 - 04:00 1.50 RIGD P COMP N/D BOPE. 04:00 - 05:00 1.00 RIGD P COMP N/U adapter Flange & Thread in 1- Wire. Test I-Wire penetrator to 5000 psi. N/U Tree & Test to 5000 psi. 05:00 - 06:00 1.00 RIGD P COMP RIU Test Manifold on Floor & Lines to Tbg, annulus & HBR. Test Lines to 4500 psi. Pull TWC wI Dry Rod. Printed: 412112003 2:36:36 PM ) ) BP EXPLORATION Q,perations Summary Report Page 8 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 Start: 3/24/2003 Rig Release: 4/16/2003 Rig Number: Spud Date: 3/25/2003 End: 4/16/2003 Date From - To Hours Task Code NPT Phase lDescriþtion of 0perations 4/16/2003 06:00 - 08:00 2.00 RIGD P COMP Drop Ball. With HB&R Pump: Pressure Tubing to 4000 psi. Hold & Chart for 30 Minutes. Bleed Tubing to 2500 psi. Pressure Annulus to 4500 psi. & Chart for 30 Minutes. Bleed off Tubing. RP Sheared @ 2000 psi. Bleed both Tubing & Annulus to" 0 ". 08:00 - 09:00 1.00 RIGD P COMP Pump 21 Bbls. Diesel down annulus. Shut in and allow to U-Tube. Freeze Protected to 507'. 09:00 - 10:00 1.00 RIGD P COMP RlU lubricator & Set BPV. No pressure on Tubing or Annulus. 10:00 - 12:00 2.00 RIGD P COMP RID Test Manifold. Flush Pums & pits wI Fresh Water. Secure Cellar & Well. RELEASE RIG @ 12:00 HRS. Printed: 412112003 2:36:36 PM Legal Name: MPS-01 Common Name: MPS-01 Test Date 3/29/2003 4/8/2003 FIT FIT Test Type Test Depth (TMD) 3,140.0 (ft) 8.170.0 (ft) ·SPE~PlliORÞirteN, Leak-Off Test Summary Test Depth (TVD) 2,381.0 (ft) 4,378.0 (ft) AMW 9.40 (ppg) 9.50 (ppg) Surface Pressure 290 (psi) 345 (psi) Leak Off Pressure (BHP) 1,453 (psi) 2,506 (psi) Page 1 of 1 EMW 11.74 (ppg) 11.02 (ppg) --j -- Printed: 4/21/2003 2:36:29 PM ')1 t ') ~ AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-01 L 1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 7,610.44' MD Window / Kickoff Survey: 7,685.00' MD (if applicable) Projected Survey: 10,530.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 23-Apr-03 ~03-035 . ¡\:,~:: ,r<~ T""" i \1, f ÌJ.~'" [" :¡~ - {¡ ,tf'= i \. it.~¡t " ~.",,'., ~1 'CO",,,,, ~ ~, t:.,,~;~, .".' /' DFJ 0 q 1. \ ;'ì ..... ,"f r\¡ ,\ L. ..:,)v,J . c,'"", ':,,~~~(;~~~~)'Jmm~ Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-01 L 1 '--'" Job No. AKZZ0002355592, Surveyed: 13 April, 2003 Survey Report 22 April, 2003 Your Ref: API 500292314160 Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027'43.0112" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 ~ Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid) Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True) Kelly Bushing: 72.50ft above Mean Sea Level Elevation relative to Project V Reference: 72.50ft Elevation relative to Structure: 72.50ft SpE!l'r'Y-SUI! DRILLING SeRViCeS A Halliburton Company Survey Ref: svy1166 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-01L 1 Your Ref: AP/500292314160 Job No. AKZZ0002355592, Surveyed: 13 April, 2003 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 9339,04 90.430 16.120 4286.57 4359.07 5010.60 N 5141.12E 6005100.54 N 571173.52 E 0.270 7114.77 938724 90.490 15.680 4286.18 4358.68 5056.96 N 5154.32 E 6005147.01 N 571186.31 E 0.921 7159.41 9435.33 89.260 16.870 4286.29 4358.79 5103.12 N 5167.80 E 6005193.29 N 571199.38 E 3.559 7204.06 9486,73 88.090 16.580 4287.48 4359.98 5152.33 N 5182.58 E 6005242.63 N 571213.73 E 2.345 7251.92 9532.10 88.460 15,900 4288.84 4361.34 5195.87 N 5195.27 E 6005286.28 N 571226.02 E 1.706 7294,02 9583,38 87.340 17.620 4290.72 4363.22 5244.94 N 5210.04 E 6005335.48 N 571240.37 E 4.001 7341.76 - 9626.42 85.800 16.910 4293.30 4365.80 5285.96 N 5222.79 E 6005376.61 N 571252.75 E 3.939 7381.92 9677,39 86.910 17.280 4296.54 4369.04 5334.58 N 5237.75 E 6005425.36 N 571267.28 E 2.295 7429.41 9722.55 87.470 18.060 4298.75 4371.25 5377.56 N 5251.44 E 6005468.46 N 571280.59 E 2.125 7471.69 9772.40 86.850 17.720 4301.22 4373.72 5424.94 N 5266.73 E 6005515.97 N 571295.46 E 1.418 7518.42 9817.05 88.700 19.780 4302.95 4375.45 5467.18 N 5281.07 E 6005558.34 N 571309.43 E 6.198 7560.52 9866.54 86.850 20.810 4304.88 4377.38 5513.56 N 5298.22 E 6005604.87 N 571326.17 E 4.278 7607.61 9913.01 86.420 21.230 4307.60 4380.10 5556.87 N 5314.86 E 6005648.32 N 571342.42 E 1.292 7651.96 9962.09 86.610 21.050 4310.59 4383.09 5602.56 N 5332.53 E 6005694.17 N 571359.69 E 0.533 7698.83 10009.58 88.640 21.330 4312.55 4385.05 5646.80 N 5349.68 E 6005738.56 N 571376.44 E 4.315 774423 10060,17 89.880 20.870 4313.21 4385.71 5693.99 N 5367.89 E 6005785.91 N 571394.24 E 2.614 7792.61 10104,23 90,060 20.820 4313.23 4385.73 5735.17 N 5383.57 E 6005827.22 N 571409.55 E 0.424 7834.69 10150,08 90.620 21.020 4312.96 4385.46 5777.99 N 5399.94 E 6005870.19 N 571425.54 E 1.297 7878.50 10200,81 88.760 19.300 4313.23 4385.73 5825.61 N 5417.42 E 6005917.96 N 571442.60 E 4.994 7926.77 10251.41 85.430 19.490 4315.80 4388.30 5873.27 N 5434.20 E 6005965.77 N 571458.96 E 6.592 7974.64 10297.19 85.550 19.370 4319.40 4391.90 5916.31 N 5449.38 E 6006008.94 N 571473.76 E 0.370 8017.88 10347.51 85.990 19.140 4323.11 4395.61 5963.69 N 5465.93 E 6006056.46 N 571489.89 E 0.986 8065.38 10393.32 84.930 19.200 4326.73 4399.23 6006.82 N 5480.93 E 6006099.73 N 571504.50 E 2.318 8108.59 10443.81 85,300 19.210 4331.03 4403.53 6054.33 N 5497.48 E 6006147.38 N 571520.63 E 0.733 8156.19 .~ 10465.10 85.490 19.210 4332.74 4405.24 6074.37 N 5504.46 E 6006167.48 N 571527.43 E 0.892 8176.27 10530.00 85.490 19.210 4337.85 4410.35 6135.46 N 5525.75 E 6006228.76 N 571548.18 E 0.000 8237.50 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 38.070° (True). Magnetic Declination at Surface is 25.555°(25-Mar-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 10530.00ft., ---- 22 April, 2003 - 9:56 Page 3 of 4 DrUlQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-01L 1 Your Ref: AP/500292314160 Job No. AKZZOOO2355592. Surveyed: 13 April. 2003 BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA The Bottom Hole Displacement is 8256.98fL, in the Direction of 42.00r (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 7610.44 7685.00 10530.00 4277.80 4302.55 4410.35 3413.15 N 3471.63 N 6135.46 N 4527.26 E 4566.27 E 5525.75 E Tie On Point Window Point Projected Survey .-- Survey tool program for MPS-01 L 1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 245.00 0.00 245.00 244.99 10530.00 244.99 AK-1 BP _HG (MPS-01 PB1 Gyro) 4410.35 AK-6 BP _IFR-AK (MPS-01PB1) -- 22 April, 2003 - 9:56 Page 4 of4 DrillQuest 3.03.02.005 " 'f f AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-01 L 1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 7,610.44' MD Window / Kickoff Survey: 7,685.00' MD (if applicable) Projected Survey: 10,530.00 I MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ) ~ 03~D3S 23-Apr-03 RECEIVED APR 2 9 2003 Alaska 0;,' & Gas Cons. Commiøion Anchorage Sperry-Sun Drilling Services Milne Point Unit BPXA Milne Point MPS MPS-01 L 1 MWD ..~ Job No. AKMW0002355592, Surveyed: 13 April, 2003 Survey Report 22 April, 2003 Your Ref: APlS00292314160 Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027'43.0112" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 ,~ Surface Coordinates relative to Project H Reference: 1000044.65 N,66076.93 E (Grid) Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True) Kelly Bushing: 72.50ft above Mean Sea Level Elevation relative to Project V Reference: 72.50ft Elevation relative to Structure: 72.5Oft Spe..........'::J-5LJf'1 DRILLING seRVIc:es A Halliburton Company Survey Ref: svy1167 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-01L 1 MWD Your Ref: AP/500292314160 Job No. AKMW0002355592, Surveyed: 13 April, 2003 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 7610.44 68.180 35.540 4205.41 4277.91 3425.92 N 4515.44 E 6003510.38 N 570561.89 E 5481.41 Tie On Point 7685.00 73.050 32.380 4230.15 4302.65 3484.24 N 4554.69 E 6003569.05 N 570600.62 E 7.657 5551.53 Window Point 7758.32 79.960 31.730 4247.25 4319.75 3544.63 N 4592.50 E 6003629.78 N 570637.89 E 9.464 5622.39 7805.60 82.640 31.330 4254.40 4326.90 3584.47 N 4616.94 E 6003669.82 N 570661.98 E 5.730 5668.81 7855,87 86.H70 30,910 4258,95 4331.45 3627.31 N 4642.81 E 6003712.90 N 570687.46 E 8.654 5718.50 7900.21 90.120 30.540 4260.08 4332.58 3665.41 N 4665.45 E 6003751.20 N 570709.77 E 7.153 5762.45 .--- 7951.74 90.990 30.070 4259.58 4332.08 3709.90 N 4691.45 E 6003795.91 N 570735.38 E 1.919 5813.51 7997.28 90.860 26.380 4258.84 4331.34 3750.01 N 4712.98 E 6003836.21 N 570756.55 E 8.107 5858.36 8048.27 89.750 24.870 4258.57 4331.07 3795.98 N 4735.03 E 6003882.38 N 570778.19 E 3.675 5908.15 8095.18 89.630 22.220 4258.83 4331.33 3838.98 N 4753.77 E 6003925.54 N 570796.55 E 5.655 5953.56 8145.75 89.320 20.600 4259.29 4331.79 3886.06 N 4772.23 E 6003972.78 N 570814.59 E 3.261 6002.00 8190.82 89.010 20.650 4259.95 4332.45 3928.24 N 4788.10 E 6004015.10 N 570830.09 E 0.697 6045.00 8242.37 88.330 18.590 4261.14 4333.64 3976.78 N 4805.41 E 6004063.79 N 570846.97 E 4.207 6093.88 8287.37 88.390 1 7.790 4262.43 4334.93 4019.51 N 4819.45 E 6004106.64 N 570860.63 E 1.782 6136.18 8338.31 87.410 16.690 4264.30 4336.80 4068.13 N 4834.54 E 6004155.39 N 570875.29 E 2.891 6183.76 8383.86 86.790 17.060 4266.60 4339.10 4111.66 N 4847.74 E 6004199.04 N 570888.10 E 1.585 6226.17 8432.01 87.340 17.1 00 4269.07 4341.57 4157.63 N 4861.86 E 6004245.13 N 570901.82 E 1.145 6271.07 8479.70 90.430 17.520 4270.00 4342.50 4203.14 N 4876.05 E 6004290.77 N 570915.60 E 6.539 6315.65 8530.02 91.300 17.670 4269.24 4341.74 4251.10 N 4891.26 E 6004338.86 N 570930.39 E 1.754 6362.78 8575.84 90.190 18.280 4268.64 4341 .14 4294.68 N 4905.40 E 6004382.56 N 570944.14 E 2.764 6405.81 8626.20 90.800 18.500 4268.20 4340.70 4342.47 N 4921.28 E 6004430.49 N 570959.60 E 1.288 6453.22 8672.48 89.690 19.180 4268.01 4340.51 4386.27 N 4936.23 E 6004474.42 N 570974.16 E 2.813 6496.92 8722.43 90.120 18.4 70 4268.09 4340.59 4433.55 N 4952.35 E 6004521.84 N 570989.86 E 1.662 6544.08 8765.71 90.060 18.280 4268.02 4340.52 4474.62 N 4965.99 E 6004563.03 N 571003.14 E 0.460 6584.83 ----- 8821.93 89.940 17.570 4268.02 4340.52 4528.11 N 4983.29 E 6004616.67 N 571019.97 E 1.281 6637.61 8861.73 91.050 17.950 4267.68 4340.18 4566.01 N 4995.43 E 6004654.68 N 571031.77 E 2.948 6674.93 8912.41 88.770 18.500 4267.76 4340.26 4614.15 N 5011.28 E 6004702.95 N 571047.19 E 4.628 6722.60 8956.92 86.670 19.800 4269.53 4342.03 4656.16 N 5025.87 E 6004745.09 N 571061.41 E 5.548 6764.67 9007.49 85.740 20.210 4272.88 4345.38 4703.57 N 5043.13 E 6004792.65 N 571078.25 E 2.009 6812,64 9051.52 83.880 18.430 4276.86 4349.36 4744.95 N 5057.64 E 6004834.16 N 571092.39 E 5.836 6854.16 9099.39 84.380 15.890 4281.75 4354.25 4790.44 N 5071.69 E 6004879.77 N 571106.04 E 5.381 6898.64 9148.38 86.790 15.570 4285.53 4358.03 4837.45 N 5084.93 E 6004926.90 N 571118.86 E 4.962 6943.81 9198,72 89.320 14.670 4287.23 4359.73 4886.02 N 5098.05 E 6004975.58 N 571131.55 E 5.334 6990,14 9244.29 90.430 16.760 4287.33 4359.83 4929.88 N 5110.39 E 6005019.55 N 571143.51 E 5.193 7032.28 9295.88 90,370 16.480 4286.97 4359.47 4979.32 N 5125.15 E 6005069.11 N 571157.82 E 0.555 7080.29 22 April, 2003 - 9:59 Page 2 of 4 DrillQuest 3.03.02.005 r' Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-01 L 1 MWD Your Ref: AP/SOO292314160 Job No. AKMW0002355592, Surveyed: 13 April, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9339,04 90.430 16.530 4286.67 4359.17 5020.70 N 5137.41 E 6005110.60 N 571169.72 E 0.181 7120.43 9387.24 90.490 16.050 4286.28 4358.78 5066.96 N 5150.93 E 6005156.98 N 571182.83 E 1.004 7165.19 9435.33 89.260 17.210 4286.39 4358.89 5113.04 N 5164.69 E 6005203.18 N 571196.18E 3.516 7209.95 9486.73 88.090 16.900 4287.58 4360.08 5162.16N 5179.76 E 6005252.44 N 571210.82 E 2.355 7257.92 9532.10 88.460 16.200 4288.94 4361 .44 5205.63 N 5192.68 E 6005296.02 N 571223.35 E 1.745 7300.10 9583.38 87.340 17.840 4290.82 4363.32 5254.63 N 5207.68 E 6005345.15 N 571237.92 E 3.871 7347.93 ~ 9626.42 85.800 17.240 4293.40 4365.90 5295.59 N 5220.62 E 6005386.22 N 571250.50 E 3.839 7388.16 9677.39 86.910 17.680 4296.64 4369.14 5344.12 N 5235.89 E 6005434.88 N 571265.33 E 2.342 7435.77 9722.55 87.470 18.210 4298.85 4371.35 5387.03 N 5249.78 E 6005477.91 N 571278.85 E 1.706 7478.12 9772.40 86.850 17.910 4301.32 4373.82 5434.36 N 5265.22 E 6005525.38 N 571293.86 E 1.381 7524.91 9817.05 88.700 20.070 4303.06 4375.56 5476.55 N 5279.74 E 6005567.69 N 571308.01 E 6.367 7567.07 9866.54 86.850 21.040 4304.98 4377.48 5522.85 N 5297.10 E 6005614.15 N 571324.96 E 4.220 7614.22 9913.01 86.420 21.410 4307.71 4380.21 5566.09 N 5313.89 E 6005657.54 N 571341.37 E 1.220 7658.62 9962.09 86.610 21.370 4310.69 4383.19 5611.71 N 5331.76 E 6005703.31 N 571358.83 E 0.396 7705.55 10009.58 88.640 21.640 4312.66 4385.16 5655.85 N 5349.15 E 6005747.60 N 571375.84 E 4.312 7751.03 10060.17 89.880 21.230 4313.31 4385.81 5702.94 N 5367.64 E 6005794.85 N 571393.90 E 2.582 7799.50 10104.23 90.060 21.200 4313.33 4385.83 5744.01 N 5383.58 E 6005836.06 N 571409.48 E 0.414 7841.66 10150.08 90.620 21.500 4313.06 4385.56 5786.71 N 5400.27 E 6005878.91 N 571425.80 E 1.386 7885.57 10200.81 88.760 19.650 4313.34 4385.84 5834.20 N 5418.10 E 6005926.56 N 571443.20 E 5.171 7933.95 10251.41 85.430 20.040 4315.90 4388.40 5881.73 N 5435.25 E 6005974.24 N 571459.93 E 6.626 7981.95 10297.19 85.550 19.770 4319.50 4392.00 5924.64 N 5450.79 E 6006017.28 N 571475.09 E 0.644 8025.31 10347.51 85.990 19.730 4323.21 4395.71 5971.87 N 5467.75 E 6006064.66 N 571491.63 E 0.878 8072.95 10393.32 84.930 19.740 4326.84 4399.34 6014.86 N 5483.17 E 6006107.78 N 571506.67 E 2.314 8116.30 10443.81 85.300 19.500 4331.14 4403.64 6062.24 N 5500.06 E 6006155.31 N 571523.14 E 0.873 8164.02 ----' 10465.10 85.490 19.680 4332.85 4405.35 6082.23 N 5507.18 E 6006175.37 N 571530.08 E 1.227 8184.14 10530.00 85.490 19.680 4337.95 4410.45 6143.15 N 5528.97 E 6006236.48 N 571551.33 E 0.000 8245.54 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 38.070° (True). Magnetic Declination at Surface is 25.555°(25-Mar-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 10530.00ft., 22 April, 2003 - 9:59 Page 3 of4 DrillQuest 3.03.02.005 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-01L 1 MWD Your Ref: AP/500292314160 Job No. AKMW0002355592, Surveyed: 13 April, 2003 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit BPXA The Bottom Hole Displacement is 8264.85ft.. in the Direction of 41.9880 (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 7610.44 7685.00 10530.00 4277.91 4302.65 4410.45 3425.92 N 3484.24 N 6143.15 N 4515.44 E 4554.69 E 5528.97 E Tie On Point Window Point Projected Survey .~ Survey tool program for MPS-01 L 1 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 245.00 0.00 245.00 244.99 10530.00 244.99 AK-1 BP _HG (MPS-01PB1 Gyro) 4410.45 MWD Magnetic (MPS-01PB1 MWD) .--- 22 April, 2003 - 9:59 Page 4 of 4 DrmQuest 3.03.02.005 ) ) ,I a03--035 II f.osrr WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation COffilTI. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 i\nchorage,Alaska 99501 April 23, 2003 RE: MWD Formation Evaluation Logs MPS-Ol Ll, AK-MW-2355592 1 LIS formatted Disc with verification listing. API#: 50-029-23141-60 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-SunDrilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. i\nchorage, Alaska 99649-6612 Date: Signed: ~~ RECE\VEO APR 2 9 2.003 \seiOn Oti & Gas cons. GOmffi A\as\(a Ancnorage ) ~Ji%7~ ~ F !Æ~!Æ~~«!Æ ) ) ATfA~KA OIL AND GAS CONSERVATION COJDIISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. ¡m AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK. 99519 Re: Milne Point Unit :MPS-01L1 BP Exploration (Alaska), Inc. Permit No: 203-035 Surface Location: 3375' NSL, 4714' WEL, Sec. 07, T12N, RIlE, UM Bottomhole Location: 591' NSL, 4402' WEL, Sec. 31,T13N, RIlE, UM Dear Mr. Archey: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well MPS-01, Permit No 203-034, API 50- 029-23141-00. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~V¡ ~t1-v(/L Randy Ruedrich Commissioner BY ORDER OF THE COMMISSION DATED this.J.Q. day of March, 2003 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration, Production and Refineries Section 12. Distance to nearest property line 13. Distance to nearest well ADL 380110,591' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 7709' MD Maximum Hole Angle 18. Casing ~rogram Specifications Size Casing WeiQht Grade CouolinQ 4-1/2" 12.6# L-80 BTC Hole 6-1/8" ) STATE OF ALASKA ) ALASKA \.ilL AND GAS CONSERVATION COMMlv~ION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil o Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE = 721 Milne Point Unit I Schrader 6. Property Designation Bluff :18b/ /lJ Cð\DL028231~ 7. Unit or Property Name Milne Point Unit 8. Well Number MPS-01 L 1 9. Approximate spud date 03/22103 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 122651 MD 144261 TVD o 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 90 Maximum surface 1695 psig, At total depth (TVD) 4275' I 2123 psig Setting Depth Top Bottom Quantity of Cement Lenath MD TVD MD TVD (include staae data) 45561 77091 43241 122651 44261 Uncemented Slotted Liner hr<:;, 1 a. Type of work 0 Drill II Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface x = 566077, Y = 6000045 33751 NSL, 47141 WEL, SEC. 07, T12N, R11 E, UM At top of productive interval x = 570601, Y = 6003585 15941 NSL, 1441 WEL, SEC. 06, T12N, R11E, UM At total depth x = 572100, Y = 6007876 591' NSL, 44021 WEL, SEC. 31, T13N, R11 E, UM 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 12276 feet 4485 feet Nt A feet NI A feet Length Plugs (measured) Junk (measured) Size Cemented MD TVD 260 sx Arctic Set (Approx.) 1121 112' 629 sx PF 'La, 261 sx Class IGI 2607' 21661 124 sx PF IE", 290 sx Class IG' 7997' 44011 Uncemented Slotted Liner 7847' - 122761 4381' - 44851 1121 20" 2607' 13-1/2" 7997' 7-518" 4429' 4-1/2" Perforation depth: measured None true vertical None 20. Attachments II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report II 20 AAC 25.050 Requirements Contact Engineer Name/Number: Matt Green, 564-5581 Prepared By NamelNumber: 21.IS~::~YC::.:::::tthp~ra:Z;CO~~~tIO.::::£~:~~~~in~::i;":Ni Date 3/ ð Y/03 Permit N~e3 -C>3S :~I~~~e~ 2- 3/$1/ -6 0 A~1Ø)tJ 3 ~~:~~:re;~~~i~:ments Conditions of Approval: Samples Required 0 Yes ŒI No Mud L09-Rt;~ire~ v 0 Yes ~ No Hydrogen Sulfide Measures 0 Yes ~ No Directional Survey Required ~ Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K fJ(5K 0 10K 0 15K 0 3.5K psi for CTU Other: ~ ~oa, ~ -, ~C" ~~~ Approved By RL-p(j'ì Æ~~ t'1.Commissioner e Form 10-401 Rev. 12-01-85 / by order of the commission Date J IID/17 3 Submit In Triplicate ) Jilne Point MPS-01 L 1 Well Permit I Well Name: I MPS-01 L 1 Drill and Complete Plan Summary I Type of Well (service I producer I injector): I Multi Lateral Producer "OA" & "OB" Surface Location: Pilot Hole Location: TOP "OB" Pilot Hole Location: BHL "OB" Well TD Target Location: TOP "OA" Target Location: BHL "OA" Well TD Target Location: TOP "OB" Target Location: BHL "OB" Well TD 1904' FNL, (3375' FSL), 4714' FEL, (67' FWL), SEC. 7, T12N, R11 E E=566076.93 N=6000044.65 3570' FNL, (1710' FSL), 4862' FEL, (417' FWL), SEC. 5, T12N, R11 E E=571161 N=6003706 2=4357' TVD 795' FNL, (4484' FSL), 2151' FEL, (31281 FWL), SEC. 5, T12N, R11 E E=573836 N=6006507 2=4572' TVD 3685' FNL, (15941 FSL), 144' FEL, (46221 FWL), SEC. 6, T12N, R11 E E=570601 N=6003585 Z=4324'TVD 4989' FNL, (5911 FSL), 4402' FEL, (8751 FWL), SEC. 31, T13N, R11 E E=572100 N=6007876 Z=4424' TVD 3450' FNL, (1830' FSL), 14' FEL, (4766' FWL), SEC. 6, T12N, R11 E E=570743 N=6003822 2=4401' TVD 4989' FNL, (591' FSL), 4402' FEL, (8751 FWL), SEC. 31, T13N, R11 E E=572100 N=6007876 2=4485' TVD I AFE Number: 1 TBD I RiQ: I Doyon 14 I I Estimated Start Date: 122 Mar 2003 I OperatinQ days to complete: 117.1 1 I MD: 112,2651 I TVD: 14,426 I I Max Inc: 190 I I KOP: 17,7091 I KBE: 1721 I Well DesiQn (conventional, slim hole, etc.): 1 Conventional Grass Roots ML Producer 1 I Objective: 1 Schrader Bluff OA Sand I Mud Program: 13.5-in Surface Hole Mud Properties: Spud - LSND Freshwater Mud Density (ppg) Funnel Vis YP HTHP pH API Filtrate LG Solids 8.6 - 9.2 75 -150 25 - 60 N/A 9.0 - 9.5 < 12 < 6.5 9.875-in Intermediate Hole Mud Properties: LSND Freshwater Mud Density (ppg) PV YP HTH P pH API Filtrate LG Solids 8.9 - 9.4 10 - 20 25 - 30 10- 11 9.0 - 9.5 < 6 < 15 6.125-in Production Hole Mud Properties: KCI-CaC03 FloPro Density (PPQ) PV YP HTHP pH API Filtrate MBT 9.7-9.8 10-20 25-30 10-11 9.0-9.5 <6 <7 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 08-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR. ') Cement Program: Casing 10.75-in 40-lb/ft L-80 BTC surface casing Size Basis 2500/0 excess over gauge hole in permafrost interval. 40% excess over gauge hole below permafrost. Top of tail cement 500-ft MD above casing shoe. Total Cement Wash 20-bbl Water Spacer Vol: 520-bbl 1i1ne Point MPS-01 L 1 Well Permit Spacer Lead Tail 50-bbl 10.3-lb/gal un-viscosified Alpha spacer 466-bbl, 629-sx 10.7-lb/gal Permafrost L - 4.15 fe/sx (cement to surface) 54-bbl, 261-sx 15.8-lb/gal Premium G - 1.15 fe/sx of tail at 07-ft BHST ::::: 55°F from SOR, BHCT 60°F estimated by Halliburton Temp Casi ng Size Basis 9.875-in open hole plug to abandon pilot hole 831-ft cement plug set on a Form-a-Plug from 8,249-ft MD (50-ft below the top OB-sand) to 7418-ft MD (150-ft above top NA-sand). 300/0 excess over gauge. Total Cement Spacer 47-bbl, 8.34-lb/gal 30/0 KCI/Water Spacer Vol: 103-bbl Lead 1 03-bbl, 496-sx 12.0-lb/gal Premium G - 1.16 fe/sx 3% KCI/Water Temp BHST ::::: 80°F from SOR, BHCT 70°F estimated by Halliburton Casing Size Basis 7.625-in 29.7-lb/ft L-80 BTC intermediate casing Top of lead cement 500-ft above top of Ugnu-sand. 00/0 excess over gauge. Top of tail cement 500-ft MD above top of N-sand. 40% excess over gauge. Total Cement Wash 5-bbl Water Vol: 111-bbl Spacer 30-bbI10.3-lb/gal un-viscosified Alpha Spacer Lead 48-bbl, 124-sx 12.0-lb/gal Permafrost E - 2.17 ft~/sx (top of lead at 5,642-ft MD) Tail 63-bbl, 290-sx 15.6-lb/gal Premium G - 1.22 fe/sx (top of tail at 6,891-ft MD) Temp I BHST ::::: 80°F from SOR, BHCT 70°F estimated by Halliburton 2 ) Evaluation Program: ')ilne Point MPS-01 L 1 Well Permit 13.5-in Hole Section: Open Hole: MWD/GR, IFR/CASANDRA Cased Hole: N/A 9.875-in Hole Section: Open Hole: MWD/GRlRES, GeoTap, IFR/CASANDRA Cased Hole: N/A 6.125-i n Hole section: Open Hole: MWD/GR/RES, ABIIIFR/CASANDRA Cased Hole: N/A Formation Markers Formation Tops M Orkb TVDrkb Pore Pressure Estimated EMW (ft) (ft) (psi) (Ib/gal)* Base Permafrost 2016 1822 TUZC 6142 3609 NA 7568 4191 1788 8.35 NB 7607 4207 1795 8.35 NC 7666 4231 1806 8.35 NE 7715 4251 1815 8.35 NF 7860 4310 1840 8.35 Top OA 7952 4347 2123 9.55 Base OA 8067 4388 Top OB 8198 4427 2163 9.55 Base OB 8356 4462 * Based on SS depths CasinglTubing Program Hole Size Csgl WtlFt Grade Conn Length Top Bottom Tbg O.D. MD I TVDrkb M D I TVDrkb 42-in 20-in* 92# H-40 Welded 80' 0' 112' / 112' 13.5-in 10.75-in 45.5# L-80 BTC 2,607' 0' 2,607' / 2,166' 9.875-in 7.625-in 29.7# L-80 BTC 7,997' 0' 7,997' / 4,401' 6.125-in 4.5-in 12.6# L-80 BTC 4,556' 7,709' / 4,324' 12,265' / 4,426' OA Slotted 6.125-in 4.5-in 12.6# L-80 BTC 4,429' 7,847' / 4,381' 12,276' / 4,485' 08 Slotted * The 20-in conductors are insulated. 3 2,123-psi @ 4,275-ft TVDrkb - Top of "OA" 1 ,695-psi @ surface (Based on BHP and a full column of gas from TO @ 0.1-psi/ft) 3,500-psi. An FIT to 11.5-lb/gal will be made on the 10.75-in casing shoe. 59.3-bbl with 9.7-lb/gal mud. 9.8-lb/gal brine 1 7.0-lb/gal Diesel (1 ,800-ft MD). ) Recommended Bit Program BHA Hole Size Depth (MD) Bit Type 1 13.5-in 0' - 2,607' Smith FGXI 2 9.a75-in 2,607' -7,997' Smith FGS+ 3 6.125-in 6,796' - TD Security FM2643 4 6.125-in 6,542' - TD Security FM2643 Well Control: Surface hole will be drilled with a diverter. Intermediate hole: · Maximum anticipated BHP: · Maximum surface pressure: · Planned BOP test pressure: · Integrity test: Kick tolerance: · Planned completion fluid: Drilling Hazards & Contingencies: Hydrates )ilne Point MPS-01 L 1 Well Permit Nozzle/Flow rate 3-1 5 & 1 -1 0 3-1 5 & 1 -1 0 3-12 3-12 · Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+1- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. · Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation · We do not expect losses while drilling this well. · Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid 4 ) )Ine Point MPS-01 L 1 Well Permit losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.35 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1-lb/gal mud. Pad Data Sheet · Please Read the S-Pad Data Sheet thoroughly. Breathing · N/A Hydrocarbons · Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults · A 175-ft down to NW fault is expected at 2,850-ft. · A 25-ft down to SW fault is expected at 7,650-ft in the pilot hole. · A 25-ft down to SW fault is expected at 7,450-ft in the Schrader OAlOB sands. Hydrogen Sulfide · MPS Pad is not designated as an H2S Pad. Anti-collision Issues · MPS-01 has no anti-collision issues. 5 ) DRILL & COMPLETION PROCEDURE Pre-Rig Operations 1. The 20-in insulated conductor is installed 2. NU diverter Procedure 1. MI/RU Doyon 14 2. Function test diverter, PU 4.0-in drill pipe 3. Drill 13.5-in surface hole 4. Run and cement 10. 75-in casing 5. ND diverter, install wellhead, NU BOPE and test 6. Drill 9.875-in intermediate pilot hole 7. Set cement plug across Schrader Nand O-sands 8. Tag cement plug 9. Open-hole sidetrack 9.875-in hole to landing point 10. Run and cement 7.625-in casing 11. Drill 6.125-in 08 horizontal production hole 12. Run 4.5-in slotted liner 13. Run whipstock and mill window for OA lateral 14. Drill 6.125-in OA horizontal production hole 15. Retrieve whipstock 16. Run 4.5-in slotted liner and hang off in 7.625-in casing 17. Displace drilling mud to brine 18. Run 4.5-in jet pump completion 19. ND /NU 20. Freeze protect well 21. RD/MO 6 1i1ne Point MPS-01 L 1 Well Permit TREE: Cameron 4-1/16" 5M , WELLHE'AD: FMC Gen 6 11", 5M Tubing Head: 11" x 4-1/2", FMC Tubing Hanger PHOPOSt::LJ c.;OMPLt:: liON I\~JS-01 1VlP~-01 L ~ KB. ELEV =72.0' Cellar Box ELEV = 38.3' 1121 1{' 20" 92 Ibltt, H-40 Welded / Insulated Diesel Freeze protect to 750' MD 10-3/4" 45.5#, L-80, BTC-M Casing Drift: 9.875 Casing 10: 9.950 Coupling 00: 11.75" Burst: 5,210 psi Collapse: 2,480 psi ... 9.8 KCI with corrosion inhibitor as packer fluid / Jet Pump Installed in Sliding Sleeve Post rig! ~III 7-5/8" 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing 10: 6.875 Coupling 00: 11.75" Burst: 6,890 psi Collapse: 4,790 psi Window in 7-5/8" casing @ 7,709' MO Well Inclination @ Window = 69 Degrees 4-1/2" liner top @ 7,847' MO (150' lap) ~ 7.625" Casing Shoe @ 7,997' MD,4,401' TVD Well Inclination @ Shoe = 80 Degrees PBTD TD DATE 27 Feb 2003 REV. BY MDG COMMENTS Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion ... 42" Hole 4-1/2" x 1" Gas Lift Mandrel @ 2,000' MO , 2000' TVO, RP shear valve open position, "X" Nipple (2.813" 10) 70' below GLM 4-1/2",12.6 Ib/tt, L-80, IBT-M Coupling OD: 5.2" DrifUlD: 3.833" Burst: 8,430, 80% 6,744 psi Collapse: 7,500, 80%=6,000 psi ~ 10-3/4"@ 2,607' MD, 2,166' TVD/RKB ~ "'B . IW 1- Wire Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down to lower sensor) Phoenix Pressure Gauge (2.840" ID) 7-5/8" x 4-1/2" Premier Packer I Set @ 5,300' MD, 4143' TVD I 3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod Wireline Entry Guide \~ --.... 6-1/8" OA Lateral TD 112,265' MDI """'-- - - -- - - OA Horizontal 6-1/8" hole r--- -- - - - - - - - 4-1/2" Slotted Liner W/Hookwall hanger ~ ~~ 9-7/8" Hole · ~ "-~ 6-1/8" OB Lateral TD \12,276' MD \ , . , - - -- OB Horizontal 6-1/8" hole ------ 4-1/2" Slotted Liner & Hanger Milne Point Unit WFI I : MPS-01 API NO: SF I I r I I /... I I r I I ~ --.1 I . L I I I r I I r I I ~ I ~ #o.~ J / x;:Jtq, __ _T_ - - _T_ - - _T_ - - _T_.JI , ~ / · I NOTES: 1. DATE OF SURVEY: DECEMBER 13 & 15, 2002. 2. REFERENCE FIELD BOOK: MP02-08 PGS. 16-17 & 20-21. 3. COORDINATES ARE ALASKA STATE PLANE, ZONE-4 NAD-27. 4. GEODETIC COORDINATES ARE NAD-27. 5. MPU S-PAD AVERAGE SCALE FACTOR IS: 0.999904923. 6. HORIZONTAL CONTROL IS BASED ON MPU CFP MONUMENT CFP-3 AND MPU H-PAD MONUMENT H-1. 7. ELEVATIONS ARE BPX MEAN SEA LEVEL BASED ON MILNE POINT PIPELINE VERTICAL CONTROL. 5 . I , ~ J ~ l ¡r¡ It , ¡ ) I ! t MPS-34t 33 .31i .29i .27 .25 .24i ·23 .21i .19i .17 .15i .13i . 11 .9i __ .7i Ii 5 __ MPS-2.!. 3 MPS-1 .... ¡ ) I .. I I J I I I 1 I I -i I I .J .l 28 21 I - Z---- I PLANT }_ 15'OO'OOH GRID 35 3r~ 32 33 " ~ ~1 6 5 PROJêcT~ , S~~ IF-^' 12~:A 8 9 10 . 34 "H-PAD T13N T12N 2 MPU S-PAD 11 Ww 13 ~:: 18 0::0:: LEGEND 14 17 16 15 4- . AS-BUILT CONDUCTOR EXISTING CONDUCTOR VICINITY MAP N.T.S. StCT - - - 1- --- ~ 72 T72 II StCT 7' . ':J. R70C:- T72N ~ . R7 7 t '. I. I I ~ SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND TI-iA TALL DIMENSIONS AND OTHER DETAILS ARE CORRECT AS OF DECEMBER 15, 2002. LOCATED WITHIN PROTRACTED SEC. 7, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS MPS-01 Y=6,000,044.65 N= 2,236.68 70'24'38.007" 70.4105578' 38.3' 3,375' FSL X= 566,076.93 E= 6,959.07 149'27'43.011" 149.4619475' 4,714' FEL MPS-02 Y=6,000,041.30 N= 2,237.19 70'24'37.976" 70.4105489' 38.3' 3,372' FSL X= 566,062.45 E= 6,944.21 149'27'43.437" 149.4620658' 4,729' FEL LOCATED WITHIN PROTRACTED SEC. 12, T. 12 N., R. 10 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINA TES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS MPS-34 Y= 5,999,917.12 N= 2,237.28 70'24'36.795" 70.4102208' 38.0' 3,252' FSL X= 565,598.66 E= 6,464.04 149'27'57.063" 149.4658508' 412' FEL I 0 '211.11»................._ r NO. OA 1'E ItE-..sION F. ROb' DRA¥I1'I: Obp COTTON "L~- CHECKED: AWSON ll__ ~ DATE: 12/11/02 DRAWlNC: MILNE POINT UNIT S-P AD FRB02 UPS 33-00 SHEET: iDœo JOe NO: AS-BUlL T CONDUCTORS SèAl£: ,JJC Rf A --.--- WEllS MPS-01. MPS-02 & MPS-34 1 OF 1 .. lOT -.0 <Me 1·. 160' BY otIC - ...... - Plan: MPS-OILI wp02 (plan MPS-OllPlan MPS-OILI Created By: Ken Allen Date: 2119/2003 Che<:ked: Date: Reviewed: Date: SURVEY PROGRAM Depth Fm Depth To Survey/Plan Tool 77Cf),00 12265,Cf) Planœð: MPS-OILl "]>02 V4 MWD>-IFR+MS REÆRENCE INFORMATION Co-o<dinale (NIE) Relèrence: WeU Centre: Plan MPS-OI, True North Vertic3I (\VD) Reference: S-Pad Dev 72,00 SectioD (VS) Reference: Slot· (O,ooN,O,ooE) Measured Depth Relèrence: S-Pad Dev 12.00 CakD!aooD Methxl: MininnUD Curvabne IJP Amoco Minimum Ü.ø''3turc ISCWSA T ray Cylirocr Nor1\¡ r~liplic.1 + Casing Rule> ßa..,d bp o WHLLDETAlLS Naiœ +NI,'; +FJ-W NoI1IIing Easting Latitude Longitude Slot Plan t.IPS-OI 6934 -267,64 6000044,95 566076,78 70024'38.oJON 149"27'43,016W NlA TARGET DETAILS Narœ TVD +NI,'; +FJ-W Northing Easling Shape MPS-01Ll D 4362.00 4868.84 5070,97 6004958,00 571104,00 Point MPS-OILl 12 4363,00 4070,95 4820,88 6004158,00 570861.00 Point MPS-OILl 14 4385,00 6116.15 551J1JJ6 60062Cf),00 571529,00 Point MPS-OILl Poly 4399.00 3556,46 430326 6003639,00 570348,00 Polygon MPS-OILl 15 4426.00 7778.1 9 6092.85 6007876,00 572100.00 Point SECTION DETAILS Sec MD Ine Azi TVD +N/-S +FJ-W DLeg TFaee VSec Targe 1 7709.00 68.89 33.09 4323.98 3500.18 4555.39 0.00 0.00 5564.57 2 7719.00 68.89 33.09 4327.59 3507.99 4560.48 0.00 0.00 5573.86 3 7906.50 89.84 24.70 4362.05 3668.51 4648.54 12.00 -22.40 5754.53 4 8162.13 89.84 24.70 4362.75 3900.74 4755.36 0.00 0.00 6003.22 5 8344.63 90,00 17.40 4363.00 4070.95 4820.88 4.00 -88.78 6177.61 MPS-OILl T2 6 8346.88 90,07 1735 4363.00 4073.09 4821.55 4.00 -38.10 6179.71 7 9132.70 90.07 1735 4362.03 4823.17 5055.86 0.00 0.00 6914.68 8 9180.81 90,00 1927 4362.00 4868.84 5070.97 4.00 92.10 6959,96 MPS-O I Ll T3 '--"" 9 9205.95 88.99 1927 4362.22 4892.58 5079.27 4.00 -179.97 6983.76 10 10493.42 88.99 1927 4384.82 6107.72 5504.10 0.00 0.00 8202.34 II 1050236 88.67 19.41 4385.00 6116,15 5507.06 4.00 156.19 8210.80 MPS-OILl T4 12 12265.09 88.67 19.41 4426,00 7778,19 6092.85 0.00 0.00 9880.44 MPS-OILl T5 FORMATIONTOPDET~S TVDPath MDPath Formation 4324.00 7709.05 TSBD-OA 4362.00 7900.00 TSBC 4401.00 11190.25 TSBB-OB CASING DETAILS MD Name Size 12265.08 4 1/2' 4.500 4426.00 No. 1 2 3 TVD CakulJtom Method: ~:~=~ Error Surface: Wamin~ Method: No. All TVD depths are ssTVD plus 72'for RKBE. /0000 9°00 6'°00 ~Oo ~oo .52:>00 '000 ~4' ..ŸOoo /' '¿::»Ooo '/000 ~,#' ~.## ~ ~<& $;:) ~'.# ,rJP 1/ I ¡P I I ~.( ----' wp02 12265,09' MD, 4426' TVD "I:j~::i;;:'IL] I ". .:: I I I I I I 9500 10000 I) I Total Depth Start Dir 4/100' : 10493.42' MD, 4384,82'TVD . f EodDi" I0502J6'MD,4385'TVD / I" Start Dir4/IOO': 9132.7' MD, 4362.03'TVD End Dir : 9205.95' MD, 4362.22' TVD Vertical Section at 38.07° [500ft/in] '¡ \ I ¡ I ; I I ¡ I I I I 7000 I un ~H'~"J 4000--= Start Dir 12/100' : 7719' MD, 4327,59'TVD _ J End Dir : 7906.5' MD, 4362.05' TVD _.~.,. .. ..bL,. . .. . .... .... ... ...S..:.t.art........D....i...r,4/100':8162.I3'MD,4362.75'TVD ~ ~, End Dir : 8346.88' MD, 4363' TVD =··j···h1t!:o ~ ~. . TSB~-(}\ TSBCr-:::-r---:.V·" 800U M~S:~ . <:' '''; I I I I 6500 I I ~ 6000 5500 ª .::: o Ë E- Ö ] 4500 ',: > " ::> ¡:: ') BP KW A Planning Report MAP ·¢~Ï1Jp~ny: ï?h,~IM: . . .·~Sit~:· . ;'W~II:" ;..' " We~h)~tb,: ~PAm~c~ Mllnø:Point. MPt$:~ªd ,. ···PlapMP$;'01 .Pll,¡lhMP$ëQ1·W1 .:;þ#e:./·2¡1~J2QOá ., Cô+()r4i J;t~¢(JSJB· . 'Yërti~~f(~:YP) .~~ctlQrl(YS)ß .... ..... . ···~.~ry¢yÇà~çt11ªti.Óµ Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Site: M pt S Pad "\ ) ·.·Time:16:09:.41p..ge:· (ïL .r~ Jc~:.· . ·Well;PlånMP.S~.01 ;TrÜ~N()rth;· enc~: '··~ë~ªgp~y??O ;............. ... .... ......;.. . .e.:.,. .. ...vy~II.(9.09N,O;OgE;,ß~;07A?i) . . ëthôd: . MioiÖ1UmCUr\istüre' . Db:Ç)rådl.Ef Alaska, Zone 4 Well Centre BGGM2002 Site Position: Northing: 5999978.00 ft Latitude: 70 24 37.329 N From: Map Easting: 566345.00 ft Longitude: 149 27 35.171 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 0.00 ft Grid Convergence: 0.51 deg Well: Plan MPS-01 Slot Name: Well Position: +N/-S 69,34 ft Northing: 6000044.95 ft Latitude: 70 24 38.010 N +E/-W -267.64 ft Easting : 566076.78 ft Longitude: 149 27 43.016 W Position Uncertainty: 0.00 ft Wellpath: Plan MPS-01 L 1 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 1/16/2003 57507 nT Depth From (TVD) ft 0.00 +N/-S ft 0.00 Height 72.00 ft Plan: MPS-01 L 1 wp02 Date Composed: Version: Tied-to: Principal: Yes Casing Points Plan MPS-01 7709.00 ft Mean Sea Level 25.63 deg 80.81 deg Direction deg 38.07 2/18/2003 4 From: Definitive Path MD . 'ft . 12265.08 TVD' ft 4426.00 [)iameter Hôle Size Nåmë in in 4.500 6.125 41/2" Dip~ng~e · Dipqirectlon ~eg dag TSBD-OA 0.00 0.00 TSBC 0.00 0.00 TSBB-OB 0.00 0.00 <-Longitude Deg Min Sec 4324.00 3556.46 4303.26 6003639.00 570348.00 70 25 12.975 N 149 25 36.823 W 4324.00 3556.46 4303.26 6003639.00 570348.00 70 25 12.975 N 149 25 36.823 W 4324.00 3297.65 4843.04 6003385.00 570890.00 70 25 10.427 N 149 25 20.999 W 4324.00 8023.29 6425.06 6008124.00 572430.00 70 25 56.891 N 149 24 34.489 W 4324.00 8162.81 6029.24 6008260.00 572033.00 70 25 58.266 N 149 24 46.100 W 4362.00 4868.84 5070.97 6004958.00 571104.00 70 25 25.878 N 149 25 14.284 W 4363.00 4070.95 4820.88 6004158.00 570861.00 70 25 18.032 N 149 25 21.634 W 4385.00 6116.15 5507.06 6006209.00 571529.00 70 25 38.142 N 149 25 1.466 W 4426.00 7778.19 6092.85 6007876.00 572100.00 70 25 54.483 N 149 24 44.243 W Formations 1\11) ft 7709.05 7900.00 11190.25 ¡VI) ft 4324.00 4362.00 4401.00 Targets MPS-01 L 1 Poly -Polygon 1 -Polygon 2 -Polygon 3 -Polygon 4 MPS-01 L 1 T3 MPS-01 L 1 T2 MPS-01 L 1 T4 MPS-01 L 1 T5 ·Þ~n1..ål1ÿ;ap Am 'Fi¢I~: ··.MilrÎe;p Site:" 'M.PtS ,welÎ'i!3lªrïfØ,<Tl .,.. . . Wellp~~b:,PlahMP~*91L1· Plan Section Information \ ) BP KW A Planning Report MAP 7709.00 7719.00 7906.50 8162.13 8344.63 8346.88 9132.70 9180.81 9205.95 10493.42 10502.36 12265.09 Survey MD , .ft 7709.00 7709.05 7719.00 7725.00 7750.00 7775.00 7800.00 7825.00 7850.00 7875.00 7900.00 7906.50 8000.00 8100.00 8162.13 8200.00 8300.00 8344.63 8346.88 8400.00 8500.00 8600.00 8700.00 8800.00 8900.00 9000.00 9100.00 9132.70 9180.81 9205.95 9300.00 9400.00 9500.00 9600.00 9700.00 9800.00 9900.00 10000.00 10100.00 68.89 68.89 89.84 89.84 90.00 90.07 90.07 90.00 88.99 88.99 88.67 88.67 locI 'q¢g . 68.89 68.89 68.89 69.55 72.33 75.12 77.91 80.71 83.51 86.31 89.11 89.84 89.84 89.84 89.84 89.88 89.96 90.00 90.07 90.07 90.07 90.07 90.07 90.07 90.07 90.07 90.07 90.07 90.00 88.99 88.99 88.99 88.99 88.99 88.99 88.99 88.99 88.99 88.99 Åihr{ . q~à 33.09 33.09 33.09 32.80 31.60 30.44 29.31 28.21 27.12 26.05 24.98 24.70 24.70 24.70 24.70 23.19 19.19 17.40 17.35 17.35 17.35 17.35 17.35 17.35 17.35 17.35 17.35 17.35 19.27 19.27 19.27 19.27 19.27 19.27 19.27 19.27 19.27 19.27 19.27 33.09 33.09 24.70 24.70 17.40 17.35 17.35 19.27 19.27 19.27 19.41 19.41 4323.98 4327.59 4362.05 4362.75 4363.00 4363.00 4362.03 4362.00 4362.22 4384.82 4385.00 4426.00 tvb ft 4323.98 4324.00 4327.59 4329.71 4337.88 4344.88 4350.71 4355.35 4358.78 4361.00 4362.00 4362.05 4362.31 4362.58 4362.75 4362.84 4362.99 4363.00 4363.00 4362.93 4362.81 4362.69 4362.56 4362.44 4362.32 4362.19 4362.07 4362.03 4362.00 4362.22 4363.87 4365.63 4367.38 4369.14 4370.89 4372.65 4374.40 4376.16 4377 .91 -H~ïi'~ ., ft'· 3500.18 3507.99 3668.51 3900.74 4070.95 4073.09 4823.17 4868.84 4892.58 6107.72 6116.15 7778.19 " ij ) ·;·D~teL211~/2p03, ..,' . Tilne., · i ...,.q?~9r~i~~te(N'~f ,. f~r~~~e: ., ,.';y~~t~~~I)@'Yµ) ·~~~c~:¡· .' ~~!=~~911 (Y$)J:{~ '" .,~DC~~.<.. .. §~ryeYÇa~ç¥la~ion:l\rJ;~th()Ø:·' . '1 . ... ,. ... .' ..' .. ~~g~:'2 MP$101,True North: .. . .' .'.,..,.....,. .~y!2&;..:, .,. ....,.,.' :"..: ...... ",.". " Well > .,.O 'o.J;O·QPEi~8.07A?i).· . Miniri1'µtnPLlÏ"\lªt~re· . ..' 'Db:' O'r!åêlå·. "'+~Nw¡··'··· 'ifF"" .. 4555.39 4560.48 4648.54 4755.36 4820.88 4821.55 5055.86 5070.97 5079.27 5504.10 5507.06 6092.85 :YÍ)~$' :¡.' ::.:..,."·."~t.iJ'ø·}' /~~rö" i ¡...,'1'F(J' ~~Q/~P9~deg/Jqpftd~~~1ººft'." '.,q~g 0.00 0.00 -22.40 0.00 -88.78 -38.10 0.00 92.10 -179.97 0.00 156.19 0.00 0.00 0.00 12.00 0.00 4.00 4.00 0.00 4.00 4.00 0.00 4.00 0.00 Sysryb ··n 4251.98 4252.00 4255.59 4257.71 4265.88 4272.88 4278.71 4283.35 4286.78 4289.00 4290.00 4290.05 4290.31 4290.58 4290.75 4290.84 4290.99 4291.00 4291.00 4290.93 4290.81 4290.69 4290.56 4290.44 4290.32 4290.19 4290.07 4290.03 4290.00 4290.22 4291.87 4293.63 4295.38 4297.14 4298.89 4300.65 4302.40 4304.16 4305.91 6003584.96 6003584.99 6003592.82 6003597.55 6003617.65 6003638.32 6003659.51 6003681.14 6003703.17 6003725.53 6003748.17 6003754.09 6003839.37 6003930.57 6003987.24 6004021.98 6004115.51 6004158.00 6004160.15 6004210.99 6004306.69 6004402.39 6004498.1 0 6004593.80 6004689.50 6004785.20 6004880.91 6004912.20 6004958.00 6004981.80 6005070.83 6005165.49 6005260.15 6005354.81 6005449.48 6005544.14 6005638.80 6005733.46 6005828.12 570600.60 570600.62 570605.62 570608.63 570621.04 570633.22 570645.14 570656.76 570668.06 570679.01 570689.57 570692.25 570730.56 570771.54 570797.00 570812.06 570847.37 570861.00 570861.65 570877.04 570906.01 570934.98 570963.95 570992.91 571021.88 571050.85 571079.82 571089.29 571104.00 571112.09 571142.33 571174.49 571206.65 571238.80 571270.96 571303.12 571335.28 571367.44 571399.60 0.00 0.00 11.18 0.00 0.09 3.15 0.00 -0.15 -4.00 0.00 -3.66 0.00 0.00 0.00 -4.47 0.00 -4.00 -2.47 0.00 4.00 0.00 0.00 1.62 0.00 Targ~t MPS-01 L 1 T2 MPS-01 L 1 T3 MPS-01 L 1 T4 MPS-01 L 1 T5 VS, . .,' ..·.'J)ts·;. .,' .TFO ft ,. ." "d¢g/1POft deg" 5564.57 0.00 0.00 5564.61 0.00 0.00 5573.86 0.00 0.00 5579.45 12.00 337.60 5602.95 12.00 337.70 5626.76 12.00 5650.82 12.00 5675.06 12.00 5699.42 12.00 5723.81 12.00 5748.19 12.00 5754.53 12.00 5845.49 0.00 5942.78 0.00 6003.22 0.00 6039.94 4.00 6135.61 4.00 6177.61 4.00 6179.71 4.00 6229.40 0.00 6322.93 0.00 6416.46 0.00 6509.98 0.00 6603.51 0.00 6697.04 0.00 6790.57 0.00 6884.10 0.00 6914.68 0.00 6959.96 4.00 6983.76 4.00 7072.77 0.00 7167.42 0.00 7262.07 0.00 7356.72 0.00 7451.37 0.00 7546.02 0.00 7640.67 0.00 7735.32 0.00 7829.97 0.00 TóòJ/Còmtrient ,.. MWD+IFR+MS MPS-01 L 1 Poly MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS 338.09 MWD+IFR+MS 338.42 MWD+IFR+MS 338.68 MWD+IFR+MS 338.88 MWD+IFR+MS 339.03 MWD+IFR+MS 339.13 TSBC 339.17 MWD+IFR+MS 180.00 MWD+IFR+MS 180.00 MWD+IFR+MS 180.00 MWD+IFR+MS 271.22 MWD+IFR+MS 271.22 MWD+IFR+MS 271.23 MPS-01 L 1 T2 321.90 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 92.10 MPS-01 L 1 T3 180.03 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS 0.00 MWD+IFR+MS '\ ) BP KW A Planning Report MAP ') ) . ..' . :. . . . .<16:09:41"( i ,. ...¡:ëª~ê: ,··3 WøU; . .MPS+Q1;Trµ'ØNQrth¡ $S~~ ......ÿ72& ,....... '.....,i>i)i YV~IJ(q~qº~~·q~99Pi3~;º~¥i). . MinirnumCurÿätur~' . ·0'6;: ·Otac;lë ~~lJÍp~M; BPAinôco "'Flêld£> Miln~P()~ht .. ," .. .... ':M·.·~~:§pap.. ;:" :,",":",:;:; . : ,". ..... o '". . .. :: ~.: ," ,':::: f'1~r MP$~01 ;« ::; '.,~.J~~~h; pla.nMPS~Q1! Survey 10200.00 88.99 19.27 4379.67 4307.67 6005922.79 571431.75 10300.00 88.99 19.27 4381.42 4309.42 6006017.45 571463.91 10400.00 88.99 19.27 4383.18 4311.18 6006112.11 571496.07 10493.42 88.99 19.27 4384.82 4312.82 6006200.54 571526.11 10502.36 88.67 19.41 4385.00 4313.00 6006209.00 571529.00 10600.00 88.67 19.41 4387.27 4315.27 6006301.34 571560.63 10700.00 88.67 19.41 4389.60 4317.60 6006395.91 571593.02 10800.00 88.67 19.41 4391.92 4319.92 6006490.48 571625.41 10900.00 88.67 19.41 4394.25 4322.25 6006585.05 571657.81 11000.00 88.67 19.41 4396.57 4324.57 6006679.62 571690.20 11100.00 88.67 19.41 4398.90 4326.90 600677 4.19 571722.59 11190.25 88.67 19.41 4401.00 4329.00 6006859.54 571751.83 11200.00 88.67 19.41 4401.23 4329.23 6006868.76 571754.99 11300.00 88.67 19.41 4403.55 4331.55 6006963.33 571787.38 11400.00 88.67 19.41 4405.88 4333.88 6007057.89 571819.77 11500.00 88.67 19.41 4408.20 4336.20 6007152.46 571852.16 11600.00 88.67 19.41 4410.53 4338.53 6007247.03 571884.56 11700.00 88.67 19.41 4412.86 4340.86 6007341.60 571916.95 11800.00 88.67 19.41 4415.18 4343.18 6007436.17 571949.34 11900.00 88.67 19.41 4417.51 4345.51 6007530.74 571981.74 12000.00 88.67 19.41 4419.83 4347.83 6007625.31 572014.13 12100.00 88.67 19.41 4422.16 4350.16 6007719.88 572046.52 12200.00 88.67 19.41 4424.49 4352.49 6007814.45 572078.92 12265.09 88.67 19.41 4426.00 4354.00 6007876.00 572100.00 --_.~-"_. 7924.62 0.00 0.00 MWD+IFR+MS 8019.27 0.00 0.00 MWD+IFR+MS 8113.92 0.00 0.00 MWD+IFR+MS 8202.34 0.00 0.00 MWD+IFR+MS 8210.80 4.00 156.19 MPS-01 L 1 T4 8303.29 0.00 0.00 MWD+IFR+MS 8398.00 0.00 0.00 MWD+IFR+MS 8492.72 0.00 0.00 MWD+IFR+MS 8587.44 0.00 0.00 MWD+IFR+MS 8682.16 0.00 0.00 MWD+IFR+MS 8776.88 0.00 0.00 MWD+IFR+MS 8862.37 0.00 0.00 TSBB-OB 8871.60 0.00 0.00 MWD+IFR+MS 8966.32 0.00 0.00 MWD+IFR+MS 9061.04 0.00 0.00 MWD+IFR+MS 9155.76 0.00 0.00 MWD+IFR+MS 9250.48 0.00 0.00 MWD+IFR+MS 9345.20 0.00 0.00 MWD+IFR+MS 9439.91 0.00 0.00 MWD+IFR+MS 9534.63 0.00 0.00 MWD+IFR+MS 9629.35 0.00 0.00 MWD+IFR+MS 9724.07 0.00 0.00 MWD+IFR+MS 9818.79 0.00 0.00 MWD+IFR+MS 9880.44 0.00 0.00 MPS-01 L 1 T5 .-..----.-..-.- --~._-,.'~,._------- ) ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO BE INCLUDED IN TRANSMiTTAL LETTER WELL NAME /J7PS - () I ¿ / PTD# "2t)::s -(.) 3~ CHECK WHAT ADD-ONS APPLIES 1/ (OPTIONS) 1'/ MULTI V ~TE;:2~U:~~ are between 60-69) "CLUE" The permit is fo~ ~ew w$!.lbore segment Of. existing well m¡?;5 -:-U I . PermitNo,¿o=?~3~I No. ~V -ðZq: Z3J¥/-Oó Production should continue to· be reported as a function' of the original API number stated above. HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). paOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/10/02 aj ody\templates The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. WELL PERMIT CHECKLIST COMPANY ð¡:?¡( WEL~NAME /~--ÓIL/ PROGRAM: Exp_ DeV~Redrll_ Re-Enter_ Serv Wellboreseg V' FIELD & POOL ,.r::;zS-IVD INIT CLASS ~v 1 rJlL- GEOL AREA ¡{q() UNIT# !')/ I:=? 7 ç¡:r ON/OFF SHORE 0'1 ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . .. AJlt:v N 11lu./-h!t;f ~( ,... ¡;,~ ttJélÑe.rf ~ ZD ¡9~C- z,~.Q)~(€) 2. Leasenumberappropriate~. . . . . . . . . . . . . . . . . . N ~...s:J-rf~'~ -I~F ~v¿.~~ v~~v~1 ~ /9';:>,- 3~O/ID. 3. Unique well name and number. . . . . . . . . . . . . . . . . N /f":;:.,¡J ~~ ~ /}.i~ L- Ò~2.~. ./5'b 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . N 5. Well located proper distance from drilling unit boundary. . . . N 6. Well located proper distance from other wells.. . . . . . . . . N APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . N ~ I 3 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . N ~/./ ~O 9. Operator only affected party.. . . . . . . . . . . . . . . . . . N 10. Operator has appropriate bond in force. . . . . . . . . . . . . N 11. Permit can be issued without conservation order. . . . . . . . N 12. Permit can be issued without administrative approval.. . . . . N (Service Well Only) 13. Well located wlin area & strata authorized by injection order#~..¥ N' (Service Well Only) 14. All wells wlin ~ mile area of review identified. . . . . . . . .. A¡,1 Y 1'.1 ' ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . Y N S 16. Surface casing protects all known USDWs. . . . . . . . . . . Y N \ L_ . :\ ~ \ . \ \ 17. CMTvoladequatetocirculateonconductor&surfcsg. . . . . Y N ().,~~ ~~"'<t""'~,,\~~~,\~ ~~: g~i:~III~~~~~:~~~~o~~i~~~~~c~~~~¿~:~~~~g: : : : : : : : ~ ~ ~\~ ~~' \\~~, ~\.}\'-~J (~~~\\\,~ ~<:>~ \-è. G:¢'¡: 20. Casing designs adequate for C~ T, B & permafrost. . . . . . . .Y N. ~~ ~\~~~ \'\ ~(.(f ~'. ~ \ "_ 21. Adequate tankage or reserve pit.. . . . . . . ~ . . . . . . . . ¥---W "- 'b.. .....f') ~ -=> ~ ~ "<' þ(\- p\ ()..""ft\ ,~~ "> ~_~ \ f) \'"\~ 22. If a re-drill, has a 10-403 for abandonment been approved. . . ¥-N- ~ ~ . \ - \ ,,' \ 23. Adequate wellbore separation proposed.. . . . . . . . . . . . ØN ~ C'~~'- ~~~,r ~ ~,~\ 24. Ifdiverter required, does it meet regulations. . . . . . . . . . II ~ ~ ." -" 25. Drilling fluid program sChem. atic & equip list adeqUate.. . . . . ... N 0-'1-.. ~Q. ~'t-J ~ t"(t. ~~~~~ rt. ~ l" t ~\.r) ~ 't'lib \Å.. \}. \ c;.. \ 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . APPR DATE 27. BOPE press rating appropriate; testto 3SùCJ psig. . N \4..~" e-~\. Q \(g<:;S- ~~\ ifê>1\A -¿ , ..o~ 28. Choke r:nanifold c?mplies w/A~1 RP-53 (May 84). . . . . . . . ,'N Ill:') j 1" \ Ie;. 29. Work will occur without operation shutdown. . . . . . . . . . . Y IJi~ 30. Is presence of H2S gas probable.. . . . . . . . . .. . . . . . Y ® (Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . . . -Y N, ~ ~ GEOLOGY 32. Permit can be issued wlo hydrogen sulfide measures. . . . . œ> N APPR DATE 33. Data presented on potential overpressure zones. . . . . . .. iff i'-r... -3.. t., ,CJ '3 34. Seismic anal~~is of shallo,:,", gas zones. . . . . . . . . . . " Affi Y ,,/)J/ 35. Seabed condition survey (If off-shore). . . . . . . . . . . . . . ,VI N (Exploratory Only) 36. Contact namelphone for weekly progress reports. . . . . . .. . Y N t .I' l GEOLOGY: PETROLEUM ENGI';;1G: RESERVOIR ENGINEERING UIC ENGINEER COMMISSIONER: Comments/Instructions: ~A' RPC - 1M ~ ¡ JH JR SP ð // ð~:? RR a.} ~¡:;ýø SFD~ MW DS 03/ Jr:JjQ.] WA Rev: 2/25/03 \well_perm it_checklist ) ) Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Pennilling Process but is part of the history file. To improve the readability of the Well History file and to simplify finding infonnation, infonnalion of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. - ) a03-086 / /05 'if Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Apr 23 09:03:21 2003 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/04/23 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/04/23 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-Ol L1 500292314160 B. P. Exploration (Alaska) Inc Sperry-Sun Drilling Services 23-APR-03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002355592 J. STRAHAN D. FERGUSON, MWD RUN 2 MW0002355592 J. STRAHAN D. FERGUSON, MWD RUN 4 MW0002355592 J. STRAHAN D. FERGUSON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 MW0002355592 B. ZIEMKE C. DIXON, J. MWD RUN 7 MW0002355592 B. ZIEMKE C. DIXON, J. # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 7 12N lIE 3375 4714 MSL 0) 72.50 38.30 ) ) # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 13.500 9.875 6.125 CASING SIZE (IN) 20.000 10.750 7.625 DRILLERS DEPTH (FT) 112.0 3140.0 7685.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL DRILLED OFF OF A WHIPSTOCK WITHIN THE RUN 4 INTERVAL OF MPS-Ol. THE TOP OF THE WHIPSTOCK WAS AT 7685'MD / 4303'TVD AND THE BOTTOM WAS AT 7697'MD / 4306'TVD. THE WHIPSTOCK WAS POSITIONED ON MWD RUN 6. SROP DATA ONLY ARE PRESENTED FOR THIS SHORT RUN. 4. MWD RUN 1 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY (GM) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUNS 2, 4, AND 7 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AND PRESSURE WHILE DRILLING (PWD). THERE IS A 2' GAP IN SROP DATA AT 6800'MD DUE TO THE DEPTH CORRECTION BETWEEN RUNS 2 AND 4. 6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP EXPLORATION (ALASKA), INC., DATED 4/15/03. MWD DATA ARE CONSIDERED PDC. HOWEVER, DATA FROM MWD RUNS 4 & 5 WERE CORRECTED (SHIFTED) TO CORRELATE WITH MWD RUN 2 DATA. RUN 7 DATA CORRELATED TO RUN 4 DATA WITHOUT CORRECTION (SHIFTING). 7. MWD RUNS I, 2, 4, 6, AND 7 REPRESENT WELL MPS-Ol Ll WITH API#: 50-029- 23141-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10530'MD/4410'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . RESISTIVITY (EXTRA RESISTIVITY ( SHALLOW RESISTIVITY (MEDIUM RESISTIVITY (DEEP ';. ') ) SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PEU TOOL CODE GR ROP FET RPD RPM RPS RPX $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 45.0 117.5 3130.0 3130.0 3130.0 3130.0 3130.0 STOP DEPTH 10477.0 10530.0 10484.0 10484.0 10484.0 10484.0 10484.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PEU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 45.0 3154.5 MWD 2 3154.5 6800.0 MWD 4 6800.0 7684.5 MWD 6 7685.0 7709.0 MWD 7 7709.0 10530.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 ) ') RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 45 10530 5287.5 20971 45 10530 ROP MWD FT/H 0.04 1915.04 282.473 20822 117.5 10530 GR MWD API 6.97 151.53 68.2971 20865 45 10477 RPX MWD OHMM 0.25 2000 14.6076 14709 3130 10484 RPS MWD OHMM 0.28 2000 18.0839 14709 3130 10484 RPM MWD OHMM 0.27 2000 21.7529 14709 3130 10484 RPD MWD OHMM 2.89 2000 25.188 14709 3130 10484 FET MWD HOUR 0.06 157.85 1.49432 14709 3130 10484 First Reading For Entire File......... .45 Last Reading For Entire File. ......... .10530 File Trailer Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.... ...... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 45.0 117.5 STOP DEPTH 3083.0 3154.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : 27-MAR-03 Insite 4.3 Memory ) TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GM Dual GR $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record. . . . . . . . . . . . .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 3155.0 112.0 3155.0 .0 67.7 TOOL NUMBER 77114 13.500 112.0 LSND 9.40 193.0 9.0 600 10.8 .000 .000 .000 .000 Name Service Order DEPT ROP MWD010 GR MWD010 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 API 4 1 68 8 3 ') .0 64.4 .0 .0 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 45 3154.5 1599.75 6220 45 3154.5 ROP MWD010 FT/H 23.15 1915.04 230.054 6075 117.5 3154.5 GR MWD010 API 12.26 148.25 68.2229 6077 45 3083 ) First Reading For Entire File......... .45 Last Reading For Entire File.... ...... .3154.5 File Trailer Service name............ .STSLIB.002 service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type................ LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 3 ') header data for each bit run in separate files. 2 .5000 START DEPTH 3083.5 3130.0 3130.0 3130.0 3130.0 3130.0 3155.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 6767.5 6759.5 6759.5 6759.5 6759.5 6759.5 6800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 31-MAR-03 Insite 66.37 Memory 6800.0 3155.0 6800.0 63.4 85.1 TOOL NUMBER 136696 121079 ) $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) 9.875 3140.0 LSND 9.40 46.0 8.8 500 5.6 4.000 2.840 3.750 3.200 62.0 90.2 62.0 62.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3083.5 6800 4941.75 7434 3083.5 6800 ROP MWD020 FT/H 2.13 1767.96 405.757 7291 3155 6800 GR MWD020 API 6.97 151.53 65.5459 7369 3083.5 6767.5 RPX MWD020 OHMM 3.63 72.04 12.0366 7260 3130 6759.5 RPS MWD020 OHMM 4.76 1725.67 12.9511 7260 3130 6759.5 RPM MWD020 OHMM 3.72 2000 14.2297 7260 3130 6759.5 RPD MWD020 OHMM 4.26 2000 21.3953 7260 3130 6759.5 FET MWD020 HOUR 0.06 62.92 0.848993 7260 3130 6759.5 ) ') First Reading For Entire File......... .3083.5 Last Reading For Entire File.......... .6800 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 F i 1 e Type................ LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name. . . Version Number...... .... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type.... .. .. .. . . .. .. LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 4 header data for each bit run in separate files. 4 .5000 START DEPTH 6760.0 6760.0 6760.0 6760.0 6760.0 6768.0 6802.5 STOP DEPTH 7684.5 7684.5 7684.5 7684.5 7684.5 7684.5 7684.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 05-APR-03 Insite 66.37 Memory 7685.0 6800.0 7685.0 58.1 84.8 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTRO MAG. RES IS. 4 TOOL NUMBER 126027 134758 '\ ) # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing................... ..60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . - 999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O ) 9.875 3140.0 LSND 9.60 57.0 10.5 1200 5.6 4.100 2.930 4.700 3.000 64.0 92.4 68.0 68.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6760 7684.5 7222.25 1850 6760 7684.5 ROP MWD040 FT/H 0.1 700.16 310.411 1765 6802.5 7684.5 GR MWD040 API 19.27 115.48 64.9075 1834 6768 7684.5 RPX MWD040 OHMM 2.64 104.25 14.6032 1850 6760 7684.5 RPS MWD040 OHMM 2.7 288.2 20.8875 1850 6760 7684.5 RPM MWD040 OHMM 2.67 456.34 25.9698 1850 6760 7684.5 RPD MWD040 OHMM 2.89 452.81 28.5312 1850 6760 7684.5 FET MWD040 HOUR 0.1 122.24 6.03446 1850 6760 7684.5 ') ) First Reading For Entire File......... .6760 Last Reading For Entire File.......... .7684.5 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type................ LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type................ LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP $ 5 header data for each bit run in separate files. 6 .5000 START DEPTH 7685.0 STOP DEPTH 7709.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: ll-APR-03 Insite 66.37 Memory 7709.0 7685.0 7709.0 73.1 73.1 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ TOOL NUMBER 184054 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 3140.0 # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): FLO-PRO 9.50 ') MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD060 58.0 9.0 42000 4.6 .000 .000 .000 .000 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 Name Service Unit DEPT FT ROP MWD060 FT/H Min 7685 0.04 Max 7709 31.02 First Reading For Entire File......... .7685 Last Reading For Entire File......... ..7709 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name... Mean 7697 12.5406 Nsam 49 49 ) .0 80.6 .0 .0 First Reading 7685 7685 Last Reading 7709 7709 ') Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type................ LO Previous File Name...... .STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR FET ROP $ 6 ) header data for each bit run in separate files. 7 .5000 START DEPTH 7685.0 7685.0 7685.0 7685.0 7685.0 7685.0 7709.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 10484.0 10484.0 10484.0 10484.0 10477.0 10484.0 10530.0 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: 13-APR-03 Insite 66.37 Memory 10530.0 7709.0 10530.0 80.0 91.3 TOOL NUMBER 184054 159436 6.125 7697.0 FLO-PRO 9.50 54.0 8.5 43000 4.0 .090 .070 .110 1.100 69.0 95.0 69.0 69.0 ') ) HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............ ..Undefined Frame Spacing................... ..60 .1IN Max frames per record..... . . . . . . . .Undefined Absent value.. . . . . . . . . . . . . . . . . . . . . -999 Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 RPX MWD070 OHMM 4 1 68 12 4 RPS MWD070 OHMM 4 1 68 16 5 RPM MWD070 OHMM 4 1 68 20 6 RPD MWD070 OHMM 4 1 68 24 7 FET MWD070 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7685 10530 9107.5 5691 7685 10530 ROP MWD070 FT/H 0.37 405.64 173.204 5642 7709.5 10530 GR MWD070 API 47.53 116.34 73.1208 5585 7685 10477 RPX MWD070 OHMM 0.25 2000 17.9427 5599 7685 10484 RPS MWD070 OHMM 0.28 2000 23.813 5599 7685 10484 RPM MWD070 OHMM 0.27 2000 30.1145 5599 7685 10484 RPD MWD070 OHMM 6.1 2000 29.001 5599 7685 10484 FET MWD070 HOUR 0.17 157.85 0.830945 5599 7685 10484 First Reading For Entire File......... .7685 Last Reading For Entire File......... ..10530 File Trailer Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/04/23 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.007 Physical EOF Tape Trailer Service name....... . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/04/23 Origin. . . . . . . . . . . . . . . . . . . STS ) ') Tape Name.............. ..UNKNOWN continuation Number..... .01 Next Tape Name. . . . . . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name.. . . . . . . . . . . .LISTPE Date.................... .03/04/23 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File