Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-045
Image F.Jject Well History File CCì...,kr Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
d Q.3 - 0 ~ Well History File Identifier
Production Scanning
Stage 1 Page Count from Scanned File: 7 5 (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~YES NO
J
Helen {Mari9.- ) Date:~ ~tf () 6- /5/
If NO in stage 1 page(s) discrepancies were found: YES NO
Organizing (done)
o Two-sided 111111111I111111111
R;SCAN
u6' Color Items:
o Greyscale Items:
DIGITAL DATA
~skettes. No.:3
o Other, No/Type:
o Poor Quality Originals:
o Other:
NOTES:
BY:
Helen ~
Project Proofing
BY:
Helen c12'aria )
Scanning Preparation
BY: Helen (Mari~
~~
x30= ho
BY:
Stage 1
BY:
Helen Maria
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Helen Maria
Comments about this file:
~escan Needed II
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
o Logs of various kinds:
o Other:: ;
VIA !J
Date:6 ~ cr tYJ- /5/ ,,~
I
)/lA~j
Date: 5" /l tf DS- /5/ , r ~
"
+ 14- = TC>TAL pAGES '/ If
(Count~ not inCJ1ude cover ,<eet)ý)A.,J
Date: D ~ os- /5/ , r ;
, I I
mD
Date: /5/
II! 1111111111111111
111111111111111111I
1111
Date: /5/
Quality Checked 1111111111111111111
• •
.~.,._
~~.- -
MICROFILMED
03/01 /2008
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
~:~,-~.
~:
F:\LaserFiche\CvrPgs_Inserts\Microfilm Marker.doc
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 14, 2006
RE: MWD Formation Evaluation Logs: 3S-21, 3S-22, 3S-23, 3S-24.
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
3S-21: UIC- 803 -03\ ~ 1'-l3~
Digital Log Images:
50-103-20452-00
1 CD Rom
3S-22: Urc- ~ð3-o II ~ ~ 1"-/3 ro~
Digital Log Images:
50-103-20446-00
1 CD Rom
3S-23: ¿)ó3 -04S- ~ 1L.¡3b5
Digital Log Images:
50-103-20453-01 SCANNED JAN 3 0 2007
3S-24: 963 -O~ ti ILI3~'t
Digital Log Images:
50-103-20456-00
1 CD Rom
1 CD Rom
c.~
-
.
e
e
Guy Schwartz
Drilling & Wells Engineer
Drilling & Wells
ConocJPhillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6958
June 9,2006
RECEIVED
JUN 1 2 2006
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West ih Avenue Suite 100
Anchorage, Alaska 99501
Alaska Oil & Gas Cons. Commission
Anchorage
Subject: Well Completion Report for 3S-23 (APD # 203-045 I 306-088)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent P&A operations of the Kuparuk well 3S-23.
If you have any questions regarding this matter, please contact me at 265-6958.
Sincerely,
0c;t~
G. Schwartz
Drilling & Wells Engineer
CPAI Drilling
SCr\NNEiÜ.,JUN 1. 5 200')
GS/skad
kl::: C EJV ì;. U
e STATE OF ALASKA e
ALASKA Oil AND GAS CONSERVATION COMMISSION
JUN 1 2 2006
ion
WELL COMPLETION OR RECOMPLETION REPOR"f't~Mfj t ~ns. Commìss
1 a. Well Status: Oil 0 Gas U Plugged U Abandoned l:J? Suspended U WAG 0 1 b. Well Class:
20AAC 25.105 20AAC 25.110 Development 0 Exploratory 0
GINJ 0 WINJ 0 WDSPl 0 No. of Completions _ Other - Service 0 Stratigraphic Test 0
2. Operator Name: 5. Date Comp., Susp., 12. Permit to Drill Number:
ConocoPhillips Alaska, Inc. q(Aban~) May 1, 2006 203-045 I 306-088
3. Address: 6:-Daté Spudded: 13. API Number:
P. O. Box 100360, Anchorage, AK 99510-0360 April 7, 2003 50-103-20453-00
4a. location of Well (Governmental Section): 7. Date TD Reached: 14. Well Name and Number:
Surface: 2560' FNL, 1246' FEL, Sec. 18, T12N, R8E, UM .- April 16, 2003 3S-23 "
At Top Productive 8. KB Elevation (ft): 15. Field/Pool(s):
Horizon: 76' FNL, 1650' FWL, Sec. 24, T12N, R7E, UM 28' RKB Kuparuk River Field
Total Depth: 9. Plug Back Depth (MD + TVD): Kuparuk Oil Pool .;
147' FNL, 3776' FEL, Sec. 24, T12N, R7E, UM 4425' MD 1 2784' TVD
4b. location of Well (State Base Plane Coordinates): 10. Total Depth (MD + TVD): 16. Property Designation:
Surface: 5993856 Zone- 4 10535' MD 16130' TVD - ADL 25544 .
x- 476013 - y- .
TPI: x- 468814 y- 5991087 Zone- 4 11. Depth where SSSV set: 17. land Use Permit:
Total Depth: x-468668 y- 5991017 Zone- 4 none ALK 2639
18. Directional Survey: Yes 0 No0 19. Water Depth, if Offshore: 20. Thickness of
N/A feet MSL Permafrost: 1707' MD
21. logs Run:
GRlRes, Dens/Neu, CCL
22. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
CEMENTING RECORD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE PUllED
16" 62.5# B surface 108' surface 108' 42" 65 bbls ArcticCRETE
9.625" 40# L-80 surface 4040' surface 2604' 12.25" 616 sx AS lite, 341 sx liteCrete
7" 26# L-80 surface 10519' surface 6116' 8.5" 256 sx Class G w/GasBlok
23. Perforations open to Production (MD + TVD of Top and Bottom 24. TUBING RECORD
Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) I PACKER SET
3.5" 10143' 10111 '
10217'-10244' MD 5857'-5880' TVD
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
n/a
26. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Plugged and Abandoned
Date of Test Hours Tested Production for Oll-BBl GAS-MCF WATER-BBl CHOKE SIZE GAS-Oil RATIO
Test Period -->
Flow Tubing Casing Pressure Calculated Oll-BBl GAS-MCF WATER-BBl Oil GRAVITY - API (carr)
press. psi 24-Hour Rate ->
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". ~~~ ~~\\.(r C-
r-' ~~
'I DI ¡::
RBDMS 8Ft JUN 1 4 2006 b<:t~ t.. h '"\-() , co,. 31~
NONE ~ DfTE
1 ç. '.0'
¡
t V:~ED
~ _..)
i -
".....---
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE
~ t'/3 'c{.
;it ø/J/t)6 G
OR\G\NAL
28.
29.
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. list intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None".
3S-23
Top Kuparuk C
10216'
5856'
N/A
30. LIST OF ATTACHMENTS
Summary of Daily Operations
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Guy Schwartz @ 265-6958
Printed Name
Signature
Title:
Phone
Drillina & Wells Enaineer
Date
~ -1-0(,
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
DATE
04/15/06
04/16/06
04/16/06
04/17/06
04/17/06
04/19/06
04/20/06
e
e
3S-23 Summary
Summary
DRIFTED TBG W/ BARBELL DRIFT (2.72 SWAGE, 3' STEM, 2.74 CENT., 5' STEM, AND
2.735 SWAGE) UNABLE TO PASS THROUGH D-NIPPLE @ 10135' RKB. DRIFTED
THROUGH AND BRUSH / FLUSHED D-NIPPLE W/ BRUSH, 3' STEM, AND 2.72 SWAGE
AND TAGGED TD @ 10219' SLM.
SET EZSV CEMENT RETAINER IN 3.5" TUBING TAIL (1ST PUP ABOVE D NIPPLE-
10123 FT MD). RU LRS, PT EZSV TO 2500 PSI, LEAK OFF TO 2430 IN 30 MINUTE,
BLEED DOWN TUBING TO 550 PSI.
Began Moving Rig from 1 H-South News Ice Pad to 3S Pad
Fin. Moving Rig and Camp from NEWS Ice Pad to 3S Pad.
STABBED INTO THE EZ - RETAINER @ 10119 CTMD, SQUEEZED 6 BBL OF 15.8
CLASS G CEMENT INTO PERFS, PULLED OUT OF RETAINER LAID IN 5 BBLS OF
CEMENT ABOVE RETAINER, WASHED CEMENT TOP TO 10045' CTMD WITH BIOZAN
FOLLOWED BY FRESH WATER AND DIESEL.
TAGGED CEMENT TOP @ 10044' SLM (10049' RKB). PULLED 1.5" DV @ 9996' RKB.
LOAD TBG & IA W/ 530 BBLS OF SEAWATER AND 85 BBLS OF DIESEL. CMIT TO
2000 PSI PASSED.
CHEMICAL CUT TUBING AT 10020'. PREP TUBING WITH STRINGSHOT PRIOR TO
CUT. GOOD CUT INDICATION. TAG TOP OF CEMENT AT 10044'.
ConocóP'hillips
Welfoilew Web Reparting
e
Time Log Summary
Blew down rig, moved rock washer and
re ared to move ri
14:30 15:45 1.25 MIRU MOVE DMOB Held PJSM then moved rig off well,
re ared ri for move
15 :45 00:00 8.25 MIRU MOVE MOB P Bregan moving rig from 1 H South
(NEWS Ice Pad) to 3S Pad, have
moved ri 12.4 miles of 25
04/17/200600:00 09:30 9.50 0 0 MIRU MOVE MOB P Fin moving Rig from NEWS Ice Pad to
3S Pad, moved rig 12.6 miles for a
total of 25 miles.
09:30 18:00 8.50 0 0 MIRU MOVE MOB P Moved rig camp 25 miles to 3S Pad
from 1 H South, shut down 2 hrs due to
flat tire, aired up and fin moving to 3S
pad, Crew set up pit liner on 3S pad
and spotted rig for maintenance, Rig
and Camp Move completed at 18:00
HRS. Rig Released for Top drive
Installation.
04/24/2006 12:00 12 :45 0.75 MIRU MOVE MOB P Moved rig 100' down 3S pad from
where top drive was changed out and
s oUed over well 3S-23A.
00:45 04:00 3.25 MIRU MOVE RURD P Bermed around rig and set in rigs
electric transformer and hooked up
lines around rig. ACCEPTED RIG @
16:00 Hrs 4/24/06
04:00 06:30 2.50 P Set in rockwasher and centrifuge
cuttings box and bermed same, RU
circ lines in cellar preparing to circ out
diesel. Ri on hi hline at 17:00 hrs
06:30 07:30 1.00 P Checked wellhead pressures, SITP
150 psi, IA 150 psi, OA -0- psi, RU
FMC lubricator and ulled BPV
07:30 08:30 1.00 P RU circulating hose to tree. Check
lines w/120 si ri air.
08:30 09:00 0.50 P PJSM with crew & mud engineer in
doghouse. Prepare to circulate out
diesel ca from tubin and annulus.
09:00 12:00 3.00 P Reverse circulate seawater down
annulus taking diesel returns from
tubing thru choke until seawater
returned. Switch lines and circulate
seawater down tubing taking diesel
returns from annulus thru choke until
clean seawater returned. Displaced
diesel cap from well. Monitor well, well
dead. Start blowing down & rigging
down circulatin lines.
04/25/2006 00:00 00:30 0.50 COMPZ WELCT OWFF P RD circulating hoses while monitoring
well.
01:00 01:30 0.50 P NO 3-118" 5 Ksi tree and tubing head
ada ter.
01:30 04:30 3.00 P Attempt to pull SBMS seal, lodged in
neck of tubing hanger. Tie on with 60"
pipe wrenches and bridge crane & pull
SBMS seal.
04:30 10:30 6.00 P NU 11" 5 Ksi BOPE. Change bottom
rams to 7".
10:30 15:00 4.50 P Test BOPE. Accumulator capacity
test: 2900 psi initial manifold
pressure, 1850 psi after all closed,
rebuilt 200 psi in 15 sec., full pressure
in 1 min 28 sec. Blind rams, variable
pipe rams, and annular to 300 psi &
3500 psi. (7" rams to be tested after
decompletion.) Choke and kill lines
and valves, choke manifold, floor safety
valves, upper and lower kelly valves to
300 psi & 3500 psi. Witnessing of test
waived by Chuck Scheve, AOGCC
Field Ins ector.
15:00 16:30 1.50 P Rack & tally 160 joints of 4" drillpipe.
16:30 17:00 0.50 P Pull two way check.
17:00 17:30 0.50 RPCO~ PULD P MU landing joint. BOLDS. Pull tubing
hanger to rig floor, 110 K# PU Wt. LD
hanger and landing joint. RU to
circulate.
17:30 18:30 1.00 P Circulate bottoms up, 6 BPM, 750 psi.
8.5 Seawater all around.
18:30 20:30 2.00 RPCO~ TRIP P POOH with 3-1/2" completion string,
stand back 11 stands for cementing,
later.
20:30 00:00 3.50 COMPZ RPCO~ PULD P Continue POOH, laying down 3-1/2"
tubing and jewelry. approximately 150
joints layed down, plus 33 in derrick at
2400 hrs.
04/26/2006 00:00 09:00 9.00 COMPZ RPCO~ PULD P Continue POH LD 3-1/2" tubing &
jewelry. Recovered entire string thru
locator/seal assembly. Chemical cut
was incomplete, left about 1-1/2"
uncut. Recoverred 319 joints, OS
Nipple, 5 GLM, CMU Sliding sleeve,
Locator/Seal ass .
09:00 10:00 1.00 RPCO~ RURD P RD tubing equipment. RU 4" DP
e ui ment. Han ton s.
10:00 12:00 2.00 RPCO~ RURD P PU & MU 7" test joint to test plug to
test 7" rams. Crossovers too tall to
close rams on 7" test joint. RD hoses
& LD test joint. Blow down water line.
Plan to test 7" rams after setting
bridge plug, with test joint made up on
DP.
04/26/2006 12:00 17:00 5.00 COMPZr RPCOtl. TRIP P MU old bit & 7" casing scraper. RIH
PU 4" DP to 4508'.
17:00 17:30 0.50 COMPZr RPCOtl. CIRC P Circulate bottoms up, 7 BPM, 540 psi.
85K# PU, 65K# SO, 35K# Block Wt.
17:30 18:00 0.50 COMPZr RPCOtl. OTHR P Blowdown top drive. Monitor well,
static.
18:00 18:30 0.50 COMPZr RIGMN SVRG P Service rig.
18:30 21:00 2.50 COMPZr RPCOtl. TRIP P POH. LD bit & scraper.
21:00 23:30 2.50 COMPZ RPCOtl. TRIP P MU Bsker 7" K-1 retainer and setting
tool on DP. RIH to 4425' (15' above 7'
coupling). 90K# PU, 70K# SO, 35K#
Block Wt. Rotate 10 turns and set
retainer, Pull 42K# over, set down
35K#, and repeat - retainer set.PU to
95K# (5K# overpull), rotate 10 turns to
close ports and release setting tool.
Bridae Pluo set at 4425' MD.
23:30 00:00 0.50 COMPZr RPCOtl. CIRC P Break circulation and circulate sea
water while preparing to displace to
8.9+ DDa mud, 5 BPM, 260 Dsi.
04/27/2006 00:00 01:30 1.50 COMPZI RPCOtl. CIRC P Pump 30 Bbl hi-visc pill, followed by
8.9+ ppg mud to displace seawater. 5
BPM, 300 psi.
01:30 02:00 0.50 COMPZr RPCOtl. TRIP P POH 1 stand. Blow down top drive.
02:00 03:30 1.50 COMPZr RPCOtl. OTHR P PU & MU 7" test joint in 4" DP string.
Close 7" pipe rams. Test rams,
casing, & K-1 bridge plug to 300 psi
for 10 min, and stage up to 3000 psi
for 15 min, OK.
03:30 04:00 0.50 COMPZr RPCOtl. RURD P Blow down & rig down test equipment.
LD 7" test ioint.
04:00 05:00 1.00 COMPZr RIGMN SVRG P Service rig.
05:00 07:00 2.00 COMPZr RPCOtl. TRIP P POH. LD Baker setting tool.
07:00 08:00 1.00 COMPZ~ RPCOtl. RURD P Load 5" DC and Baker tools for cutting
casino.
08:00 11:00 3.00 COMPZ~ RPCOtl. TRIP P MU casing cutter BHA. RIH to 4188'.
MU top drive, circulate slow, & locate
casing collar. Blow down top drive,
stand back 1 stand.
11:00 12:00 1.00 COMPZr RIGMN OTHR T Trouble shoot top drive.
12:00 12:30 0.50 COMPZr RPCOtl. OTHR P Break circulation rotating w/ top drive
and cut casing at 4214' MD. Good
indications on pump of cut.
12:30 13:30 1.00 COMPZr RPCOtl. CIRC P RU lines and attempt to circulate out
7" x 9-5/8" annulus. Pressured up, no
00.
13:30 16:30 3.00 COMPZ~ RPCOtl. TRIP P POOH. Change knives in casing
cutter. Old knives showed proper wear
for a cut.
17:00 18:30
18:30 20:00
20:00 20:30
20:30 23:00
23:00 00:00
04/28/2006 00:00 02:00
02:00 03:00
03:00 04:30
04:30 09:30
09:30 11 :30
11:30 13:30
13:30 16:00
16:00 17:00
1.50
1.50
0.50
P RIH with casing cutter. Locate
coupling at 4151'. PU 2' and cut
casing at 4149' MD. Good indications
on urn of cut.
P Circulate in 7" casing while rigging up
lines. Close bag and attempt to
circulate out 7" x 9-5/8" annulus.
Pump 1.1 BPM, 16 SPM, 1250 psi
getting small stream of returns from
OA. A rox 10% returns.
P Monitor well for flowback.
P POH. LD casing cutter assy.
P Bring in casing spear tools. MU 7"
casin s ear with ackoff.
P Finish MU 7" casing spear assy on a
joint of 4" DP. MU head pin & hose.
RIH & spear casing in first joint below
casing hanger. BOLDS. Pull up in
stages to 250K# and hold, got about
1-1/2" of stretch. Slack off to 150K#
and break circulation, 1.5 BPM, 1200
psi. PU to 175k# and pipe pulled free,
pressure dropped to 70 psi, full
returns. Pull 7" hanger above rig floor,
circulate at 3 BPM, 200 psi. 120K#
PU, 75K# SO, 35K# Block Wt.
P CBU displacing diesel, water, and
spoiled mud from annulus outside 7".
Circulated another bottoms up to clean
up hole. Worked casing -5' a few
times, movin freel .
P Break out & LD casing spear assy.
Clean and remove Baker fishing tools.
RU casin sli s & elevators.
P PJSM with GBR. POH laying down 7"
casin . Recovered 102 ·oints.
P RD GBR. Remove casing from pipe
shed. Tally 3-1/2" tubing in derrick.
RU tubin ton s.
P RIH with 11 stands of 3-1/2" tubing
stin er. RIH with DP.
P RU to circulate, tag bridge plug at
4423'. Circulate to clean up hole for
cementin ,6 BPM, 350 si.
P RU to cement. PJSM with Dowell and
rig crew. Dowell pump 10 Bbls water
ahead, followed by 43 Bbls of 17.0 ppg
Class G Cement (+0.2% 046, 1.0%
065,0.2% 0167, 0.1% S002.), chase
with 3 Bbls water. Switch to rig pump
and pump 32 Bbls mud to spot
balanced lu .
2.50
1.00
2.00
1.00
COMPZ RPCO~ CIRC
1.50
COMPZ RPCO~ PULD
5.00
RPCO~ PULD
2.00
RPCO~ RURD
2.00
RPCO~ TRIP
2.50
RPCO~ CIRC
1.00
COMPZ RPCO~ OTHR
04/28/2006 17:00 18:00 1.00 COMPZt RPCOfl. TRIP P POH 10 stands, slow.
18:00 19:00 1.00 COMPZt RPCOfl. CIRC P Circulate to clean out DP, stinger, and
hole, 6 BPM, 330 psi.
19:00 19:30 0.50 COMPZt RPCOfl. OTHR P Install Super Sliders on bottom of DP
stands in derrick.
19:30 22:00 2.50 COMPZt RPCOfl. TRIP P POH installing a Super Slider near the
bottom of each joint of DP.
22:00 00:00 2.00 COMPZr RPCOfl. PULD P RU tubing tongs. Continue POH LD
3-1/2" tubinQ stinQer.
04/29/2006 00:00 07:00 7.00 COMPZt RPCOfl. NUND P Change lower pipe rams from 7" to 4".
ND BOPE, install 2' drilling spool, NU
BOPE.
07:00 10:00 3.00 COMPZt RPCOfl. OTHR P Load BHA & subs in pipe shed.
Change liners in mud pumps from
5-112" to 5".
10:00 15:00 5.00 COMPZt RPCOfl. PULD P PU and stand back 4" DP.
15:00 19:00 4.00 COMPZr RPCOfl. OTHR P Rack & tally 7" casing in pipe shed.
19:00 22:30 3.50 COMPZr RPCOfl. OTHR P Test BOPE: Blind rams, upper and
lower pipe rams, annular, spools to
300 psi & 3500 psi. Choke & kill lines
and valves, choke manifold, floor safety
valves, top drive valves to 300 psi &
3500 psi. Accumulator capacity test,
OK. Witnessing of test waived by Lou
Grimaldi, AOGCC Field Inspector.
22:30 23:00 0.50 COMPzr RPCOfl. OTHR P Continue rack & tally 7" casing.
23:00 00:00 1.00 COMPZr RPCOfl. DHEQ P RU & test 9-5/8" surface casing
against blind rams. 3000 psi for 30
minutes, lost 150 psi, good test.
Continue rack & tally 7" casing while
testing.
04/30/2006 00:00 06:30 6.50 COMPZI RPCOfl. OTHR P Continue rack & tally 7" casing, drift
same.
06:30 08:00 1.50 COMPZ RIGMN SVRG P Slip & cut 42' of drilling line. Check
crown-o-matic.
08:00 15:00 7.00 COMPZt RPCOfl. PULD P PU & MU BHA. Download MWD tools
and shallow test.
15:00 16;00 1.00 COMPZt RPCOfl. TRIP P RIH PU DP.
16:00 16:30 0.50 COMPZt RIGMN SVRG P Service rig.
16:30 18:30 2.00 COMPZt RPCOfl. TRIP P Continue RIH PU DP.
18:30 23:00 4.50 COMPZr RPCOfl. OTHR P Tag cement at 3696'. Clean out firm to
hard cement to 9-5/8" shoe at 4040'.
Drill below shoe & orient motor to low
side. Drill on low side to 4090' MD
(2627' TVD) to start sidetrack. 110 K#
PU, 62K# SO, 80K# Rot. Wt., 35K#
Blocks. 8K# WOB, 133 Motor RPM,
165 SPM, 400 GPM, 5150 ft-Ib Torque
on btm, 4800 ft-Ib Torque off btm, 1280
si on btm, 1180 si off btm.
05/01/200600:00 01:00 1.00 4,090 4,090 INTRM1 STK P Circulate & condition mud and hole for
LOT/FIT. Mud 9.0 in & out.
01:00 02:00 1.00 4,090 4,090 INTRM1 STK OTHR P Blow down top drive. Stand back 1
stand. RU lines to pump down DP &
annulus. Close pipe rams. Pressure
up at 6 SPM, 0.35 BPM and do
Leak-Off Test. Formation leak-off at
640 psi w/9.0 ppg mud, 13.7 ppg
EMW. Shoe at 4040' MD, 2606' TVD.
02:00 02:30 0.50 4,090 4,090 INTRM1 STK OTHR P Bleed off pressure. Open rams. Blow
down & ri down hoses.
02:30 12:00 9.50 4,090 4,426 INTRM1 DRILL KOST P Orient motor down to low side and
continue sliding from 4090' to 4155'.
Continue drill & slide to 4426' MD,
2804' TVD.
12:00 00:00 12.00 4,426 5,318 INTRM1 DRILL DDRL P Continue directionally drilling 8-1/2"
hole to 5318' MD, 3321' TVD, and
drilling ahead. Pump sweeps as
needed to kee hole clean.
05/02/2006 00:00 12:00 12.00 5,318 5,757 INTRM1 DRILL DRLG P Cont directionally drilling 81/2" hole
per directional plan from 5,318' MD to
5,757' MD/3,577' TVD (439'), ART 8.25
hrs, AST .50 hrs, ADT 8.75 hrs, 5-38K
on bit, 80 rpm's, 210 spm, 514 gpm,
off btm pressure 2,420 psi, on btm
pressure 2,280 psi, off btm torque
5,775 ftllbs, on btm torque 7,300 ftllbs,
rot wt 90K, up wt 150K, dwn wt 70K,
9.2+ ppg LSND MW, ave ECD 10.3
12:00 00:00 12.00 5,757 6,463 INTRM1 DRILL DRLG P Cont directionally drilling 81/2" hole
per directional plan from 5,757' MD to
6,463' MD/3,983' TVD (706'), ART 7.92
hrs, AST .86 hrs, ADT 8.78 hrs, 10K
on bit, 80 rpm's, 210 spm, 510 gpm,
off btm pressure 2,180 psi, on btm
pressure 2,400 psi, off btm torque
8,600 ftllbs, on btm torque 8,300 ftllbs,
rot wt 97K, up wt 165K, dwn wt 73K,
9.1 + ppg LSND MW, ave ECD at 10.3
05/03/200600:00 01:00 1.00 6,463 6,518 I NTRM 1 DRILL DRLG P
01:00 01:30 0.50 6,518 6,518 INTRM1 DRILL OTHR T
'( .
e
lUj:....rm¡n.." .,'. .~.íP.'....:
: ·Ui H....
i!lf
e
AI,ASIiA. OIL AND GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
Guy Schwartz
Wells Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Kuparuk River Field, 3S-23
Sundry Number: 306-088
~oY () 'f5""
Dear Mr. Schwartz:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
/
DATED thisJbay of March, 2006
Encl.
..
. STATEOFALAy~t ~flvR:~~:~:~
ALASKA Oil AND GAS CONSERVATION COMMISSION C Commission
APPLICATION FOR SUNDRY APPROVA~askaOi'&Gas ons.
Anchorage
20 MC 25.280
.,
þ
1. Type of Request: Abandon 0 Suspend D Operational Shutdown D Perforate D Waiver D Other D
Alter casing D Repair well D Plug Perforations D Stimulate D Time Extension D
Change approved program D Pull Tubing D Perforate New Pool D Re-enter Suspended Well D
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
ConocoPhillips Alaska, Inc. Development 0 Exploratory D 203-045 -/
3. Address: Stratigraphic D Service D 6. API Number:
P. O. Box 100360, Anchorage, Alaska 99510 50-103-20453-00'
7. KB Elevation (ft): 9. Well Name and Number:
RKB 28' 3S-23 _
8. Property Designation: 10. Field/Pool(s):
, Kuparuk River Field 1 Kuparuk Oil Pool ,
ADL 25544, ALK 2639
11. PRESENT WELL CONDITION SUMMARY
Total depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
10535' 6130' 10236' 5873'
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 80' 16" 108' 108'
SURFACE 4020' 9-5/8" 4040' 2604'
PRODUCTION 10499' 7" 10519' 6116'
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
10217'-10244' 5857'-5880' 3-1/2" L-80 10143'
Packers and SSSV Type: Packers and SSSV MD (ft)
Baker SAB-3 pkr @ 10111 '
Camco 'OS' nipple @ 490'
12. Attachments: Description Summary of Proposal D 13. Well Class after proposed work:
Detailed Operations Program 0 BOP Sketch D Exploratory D Development 0 Service D
14. Estimated Date for .' 15. Well Status after proposed work:
Commencing Operations: April 1, 2006 Oil D Gas D Plugged 0 Abandoned 0
16. Verbal Approval: Date: WAG D GINJ D WINJ D WDSPL D
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Guy Schwartz @ 265-6958
Printed Name Guv Schwa~ ~ Title: Wells Engineer
Signature h'_ cY, ,-z Phone Date
~ j
( / ~ Commission Use Only
(..
,
SUndry,~;: 07J~
Conditions of approval: Notify Commission so that a representative may witness '() -
Plug Integrity .~ BOP Test D Mechanical Integrity Test D Location Clearance D
Other: ~ ~V-\, "\,,,~
~/ì
I
SOb,""o.,' Fo"" Reqo;œ', "' RBDMS 8Fl MAR 1 6 ZOOßY~~
1 APPROVED BY gfJ,ðb
Approved by: ( J / I COMMISSIONER THE COMMISSION Date:
\./ -V, ,
\N '5 I~-:' C(¿
Form 10-403 Revised 7/200&./ ubmit in Duplicate
OR\G
~~þ
~ .
e
e
March 16,2006
To:
From:
Subject:
Sundry #306-088 File
D.S. Roby
Review of application
On March 15,2006, the Commission received an Application for Sundry Approval,
Sundry Number 306-088, to plug and abandon well3S-23, Permit Number 203-045, in
the Kuparuk River Oil Pool. The cover letter submitted with the application stated that
the wellbore would be P&A'd so that the well could be redrilled as a horizontal well into
the same sand. The letter also stated that current production is approximately 450 BOPD,
Commission records indicate that current production is 323 BOPD. Commission records
indicate that the current gas oil ratio is approximately 600 scf/stb and the producedV¡{ter
cut is approximately 45%. Below is a current production plot for the subject well
1/'fI~Ra1dicn
1)
mD
1JD
10
01
001
:lIB
'"
¡¡;
œ
OOE
The Commission has not received the related APD for the 3S-23A horizontal well that
ConocoPhillips proposes to drill so I called Mr. Guy Schwartz to discuss their proposal.
My main concerns were the potential abandonment of reserves and the location of the
new well related to the existing wellbore. Mr. Schwartz informed me that the new
wellbore would target the same fault block as the existing wellbore and in addition would
target another fault block further to the South that is not currently being tapped.
Based on my discussion with Mr. Schwartz I do not believe that the proposed action will
cause a loss of recoverable reserves. Therefore, I recommend approval of Sundry
Application 306-088.
D.S. RObyk---,.
March 16, 2006
· '. ...
,.~
ConocoPhillips
e
March 14,2006
Alaska Oil and Gas Conservation Commission
333 West ih Avenue
Suite 100
Anchorage, Alaska 99501
(907) 279-1433
Re: Application for Permit to Plug and Abandon, Producer 3S-23
--"
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Plug and Abandon an onshore Producer well,
KRU 3S-23, a development well. After P & A the well will be sidetracked to new location 3S-23A. '
The attached P & A procedure outlines the basics steps including cementing the current well
perforations, pulling tubing and 7" casing and kicking off the new well within a cement plug. .
The overall objective of the project is to drill a single horizontal rotary sidetrack lateral from the 3S-23
well bore to develop "C" sand reserves in the southwest edge of the 38 drill site. This horizontal lateral will
be placed due south of the 3S-23 and drilled in a southerly direction. The production hole will be 5,561
feet in length with the horizontal lateral length from landing to TO will be 5,247 feet. The current 3S-23 "
completion, making 450 bopd, will not be retained
The expected spud date is April 1 ,2006."
If you have any questions or require any further information, please contact Jason Brink at 265-6419 or
Guy Schwartz at 265-6958.
Sincerely,
0;z:Ç2
Drilling and Wells Engineer
.'
3S-23A Drillina Proaram
Pre-Rig Well Work:
e
----
þ.
1. Test wellhead Packoffs.
2. Set 3.5" cement retainer in tubing tail at 10135' md . Circulate tbg/IA to brine thru open GLM @9996' md.
3. Perform combo MIT.
4. RU CTU and sting into cement retainer. Sqz cement away.' Un-sting and leave 60' of cement above retainer.
5. Tag and pressure test the cement plug. (AOGCC witness needed) \
6. Chemical cut 3.5" tubing at 10,020' L...,. \'Vo..\ "..::,,,,,,'-.,) "'-'\ ûc.~~\
7. Set BPV and prep wellhead for rig arrival. '\,)0 \~~ "-.J ( O\J\- <;~(tL<'\ ~
if\ ~.~ \. ~,) ~~\~)
Ift~ '? It lp
Rig Work:
1. MI/RU Nordic 3. Install and test two way check.
2. Nipple down tree and tubing head adapter.
3. NU and test the ll"x 5K" BOPE to 250 PSI /5000 PSI.
4. Pull TWC.
5. . Pull and LID the tubing hanger and all but 1000' of 3-1/2" tubing.
6. Set Wear Bushing.
7. RU E-Line. MU 7" CIBP and set inside 7" casing at 4440' MD.
8. Chemically cut 7" casing at 4240' MD which is 200' below the 9-5/8" surface casing shoe.
9. Pull 9-5/8" x 7" packoff. MU 7" landing joint or spear and unland 7" packoffs, hanger and casing.
10. Ensure 7" casing is free and circulate hole to 9.2 PPG LSND.
11. Pull and lay down 7" casing. Test all casing for NORM.
12. Install wear bushing. MU 3-1/2" mule shoe, 1,000' of 3-1/2" tubing stinger, 4" drill pipe and RIH to PBTD at 4440' MD
13. Spot a 700' balanced cement plug on top of CIBP with the TOC inside 9-5/8" casing shoe at approximately 3740' MD.
POOH 3 stands and circulate above cement plug. \
" .. ~~"It...'\\k.~~ ~~"'t.~\-VtJ\..:}'",,<2.~\"'7 ~ F~Q.... 1
14. POOH and LD 3-1/2 tubing stinger. ~:n ~ ~'1-- ~~ 4'-\~\>\~) ~ Ic..-À ~S k2-"'M) II ~
15. PU drilling BHA, 4" DP, and RIH to TOC and tag for cement hardness. Test 9-5/8" casing to 2500 PSI for 30 minutes
and record on chart.
start of DrillinG ooerations for New Well 3S-23A , 40 LL "'9,,---.j~ ¡
16. Drill to kickoff point and drill out 20' to 50' of new hole. Perform LOT. Minimum 12.5 PPG EMW LOT required based on
kick tolerance. Expect 14.1 PPG LOT based on old well bore.
17. Directionally drill 8-1/2" intermediate hole section through the top of the Kuparuk C sand landing at approximately
10,431' MD and 85 degrees deviation.
3
Put
well on production
2
Flowback well to tanks to clean up returns before diverting into production facility.
1.
Rig Procedure
RU SL and
insta
GLD
Post
32. Move rig off.
31. Set BPV.
30. Pressure annulus and shear
RP valve in GLM, freeze protect the tubing and IA with diesel
29
Install two way check. Nipple down BOP. Nipple up adapter, tree and test to 5000 PSI
Pul
two way check.
28. Sting
in, space out and land hanger.
RILDS
Pressure test the IA.
27. Circulate corrosion inhibited fluid into the 3-1/2"
x 7"
annUlus.
26. Run 3- V2,
9.3#, L-80 tubing with profile nipple, gas
ift mandrels and stinger assembly to depth
25. POOH, laying down dril
pipe as required
24. Set
iner hanger and ZXP liner top packer.
Release hanger running tool
POOH
23. Run 4-1/2"
slotted
ner and liner hanger.
22. Circulate the hole clean and pull out of hole.
21
Dril
6-1/8"
horizontal section to well TD at 15,947'
20. Circulate hole from LSND mud to FloPro drill-in fluid
19. Make up 6-1/8" drilling assembly. Clean out to float collar and perform 30 minute casing test to 3,000 psi. Drill out 20
to 50 feet of new hole and perform LOT. Minimum LOT is 13.4 PPG EMW to compensate for expected ECD in this hole
section
þ
18. Run and cement 7" casing as paogram bringing the top of the cement b
annulus with seawater then freeze protect casing annulus with diesel.
to 9432' MD
Flush 9-5/8" x 7" casing
ConocoPhiUips AI..., Inc.
e
KRU
~-23
':t!'.:*,,':t
API: 501032045300 Well Type: PROD AnQle @ TS:' 32 deQ @ 10216
TIJBING SSSV Type: NIPPLE Orig 4/20/2003 Angle @ TO: 30 deg @ 10535
(0-10143, Completion:
00:3.500,
10:2.992) Annular Fluid: Last W/O: Rev Reason: Correct TBG &
SURFACE CSG tops
(04040, Reference Loa: 24' RKB Ref Loa Date: Last Update: 12/28/2004
00:9.625,
Wt:40.00) Last TaQ: 10236 TO: 10535 ftKB
~a Date: 101312004 Max HOle===722
.,..*:, ,- AL
Description Size Top Bottom TVD Wt Grade Thread
'ROOUCllON CONDUCTOR 16.000 0 108 108 62.50 H-40 WELDED
(0-10519, SURFACE 9.625 0 4040 2604 40.00 L-80 BTCM
00:7.000, PRODUCTION 7.000 0 10519 6116 26.00 L-80 BTCM
Wt:26.00)
I JRINn
Size I Top I Bottom I TVD I Wt I Grade Thread
.._~.n'.'_'_ 3.500 0 t 10143 I 5795 t 9.30 t L-80 EUE8RD
'p~!!º~-ª!ions Summary .-..--
Interval ! TVD Zone ' Status ' Ft SPF Date Type Comment
10217 - 10219 5857 - 5859 C-4 2 6 4/29/2003 IPERF 2.5" HSD PJ, 60 dea ohase
10219 - 10239 5859 - 5875 C-4 20 11 12/4/2003 RPERF 2.5" Power Spiral EJ HMX
charaes, 45 dea Dh
10239 - 10244 5875 - 5880 C-4 5 6 4/29/2003 IPERF 2.5" HSD PJ 60 deQ phase
Interval Date Type I Comment
10217 - 10244 12/7/2003 I FRAC 143.772#PROPW/7~S
Gal
St MD TVD Man Man Type V Mfr V Type V 00 Latch Port TRO Date Vlv
Mfr Run Cmnt
1 3907 2544 CAMCO KBUG-M DMY 1.0 BK 0.000 0 11/29/200
2 6475 3744 CAMCO KBUG-M DMY 1.0 BK 0.000 0 11/29/200
3 8269 4592 CAMCO KBUG-M DMY 1.0 BK 0.000 0 11/28/200
4 9383 5221 CAMCO KBUG-M DMY 1.0 BK 0.000 0 11/28/200
5 9996 5673 CAMCO MMG OV 1.5 RK 0.188 0 101312004
, Other (plu.Q,~ 1!9.1J!.I!.~L~!~.t:J..E;YVELRY
- ---.-" ...---
Depth ' TVD Tvpe ; Description 10
Gas Lift I- " 24 24 HANGER FMC 3.5" GEN 5 TUBING HANGER 3.500
MandrelNalve 490 489 NIP CAMCO 'DS' NIPPLE WINO GO PROFILE 2.875
5 10048 5716 SLEEVE-O BAKER CMU SLIDING SLEEVE WIDS PROFILE 2.813
(9996-9997, 10095 5755 LOCATOR LOCATOR SUB & PBR SEAL ASSEMBLY 3.020
10096 5755 PBR BAKER 80-40 PBR 3.020
10111 5768 PACKER BAKER SAB-3 PACKER W/MILLOUT EXTENSION 10 3.72" 3.250
10135 5788 NIP CAMCO '0' NIPPLE W/2.75" NO GO PROFILE 2.750
SLEEVE-O ¡II 10142 5794 WLEG BAKER PUMP OUT SUB 2.990
10048-10049, ~5795 TTL 2.992
00:4.500) Notes
Date Note
5/11/2003 TREE: GMC I GEN 5 I 5M
, TREE CAP CONNECTION: TOP 5.75" ACME with 3.5" EUE 8RD THREAD
LOCATOR
: 1 0095·1 0096,
00.5,890)
PBR ..,."...
1 0096-1 0097,
00.5,890) - -
PACKER
:10111-10112,
00:5.968)
NIP I
10135-10136,
00:4.540)
WLEG
10142-10143,
00:4.510)
Perf t ~
,10217-10244)
FRAC ~
10217-10244) )
e
e
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
February 13, 2004
1~1~
RE: MWD Formation Evaluation Logs 3S-23,
AK-MW-2381363
The technical data listed below is being submitted herewith. Please address any problems or concerns
to the attention of
Rob Kalish, Sperry-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
~ 3S-,Ç?3
Digital Log Images
50-103-20453-00
DDf.J -D4 5'
] CD Rom
l~n\PICI~~
L))l~~j lUJltt)
? ~Wð1J1 [XQ
I q \~J À-D~)-
DATA SUBMITTAL COMPLIANCE REPORT
5/10/2005
Permit to Drill 2030450
r
Operator CONOCOPHILLlPS ALASKA INC
Ij? tA.J ?;1--¡1 Ado.)
API No. 50-103-20453-00-00
MD
1 0535 ,,/
REQUIRED INFORMATION
Mud Log No
Samples No
Well Name/No. KUPARUK RIV UNIT 3S-23
Completion Date 4/19/2003 ./
Completion Status 1-01L
lVD 6130
DATA INFORMATION
Types Electric or Other Logs Run: GRlRes, Neutron, Density, eeL
Well Log Information:
Log/
Data Digital
Type Med/Fnnt
r:-----~~_.-
~o-""-9
,!~/'
~
I
~O
~ D
t::/
i ____
~
--'Rpt
~~
Well Cores/Samples Infonnation:
Pdf
Electr
Dataset
Number Name
Directional Survey
Directional Survey
Directional Survey
@709 Li&Verifil..dLlon (~tIt tUlI(. e..{
Directional Survey
Directional Survey
Directional Survey
LIS Verification
_ ~rforation
"(Production
~9 Induction/Resistivity
5
5
Blu
Blu
Log Log Run
Scale Media No
1
(N;O j {..fJ
1
Y'(} P fJcnL-1
Name
Interval
Start Stop
Received
Sent
ADDITIONAL INFORM~ON
Well Cored? ykL)
Chips Received? Y / N
Analysis
Received?
.-
-------
Comments:
Daily History Received?
Formation Tops
"-
Y¡N
Current Status 1-01L
ute N
Directional Survey ~ ~ J-I.t.,
(data taken from Logs Portion of Master Well Data Maint)
---
Interval OH/
Start Stop CH Received Comments
0 262 Open 4/29/2003 GYRO
262 10535 Open 4/29/2003 MWD
262 10535 Open 4/29/2003
4020 1 0503 Open 5/13/2003
0 262 Open 4/29/2003 GYRO
262 1 0535 Open 4/29/2003
262 10535 Open 4/29/2003 MWD
4020 10503 Open 5/13/2003
9990 10305 Case 5/30/2003 CULLED
10090 10330 Case 6/27/2003 CULLED
4050 10535 Open 4/23/2004 MWD,ROP, DGR, EWR
-'
Sample
Set
Number Comments
GJN
.,
é)N
DATA SUBMITTAL COMPLIANCE REPORT
5/10/2005
Permit to Drill 2030450
Well Name/No. KUPARUK RIV UNIT 3S-23
Operator CONOCOPHILLlPS ALASKA INC
MD 10535
TVD 6130
Completion Date 4/19/2003
Completion Status 1-01L
Current Status 1-01L
.~---
~
Date:
Compliance Reviewed By:
API No. 50-103-20453-00-00
UIC N
),> ~ ~r-
-
)
}
é1 tJ :? -ot/ f;/
It. S--' c:¡
WELL .LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm..
Attn.: Howard Oldand
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
April 20, 2004
RE: MWD Fonl1ation Evaluation Logs 38-23,
AK-MW-2381363
The technical data listed below is being submitted herewith. Please address any problems or concerns
to the attention of
Rob Kalish, Sperry-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
3$ ~ 2 '?>
3S-10:
Digital Log Images
50-103-20453-00
1 CD Rom
lor 7~.I- r ,,¡{; <I ~
RECEIVED
f. en 2 -:~ 2004
~.t f\ \)
AIBIka Oil & Gas COns. CùI1.11i1Dt
A....
)
ConocóPhillips
Mike Mooney
\ Wells Group Team Leader
, Drilling & Wells
P. O. ßox 100360
Anchorage, AK 99510-0360
Phone: 907-263-4574
January 27,2004
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Report of Sundry Well Operations for 3S-23 ( APD 203-045)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Report of Sundry Well Operations
for the recent stimulation operations on the Kuparuk well 3S-23.
If you have any questions regarding this matter, please contact me at 263-457 4.
Sincerely,
i1J 4~
M. Mooney
Wells Group Team Leader
CPAI Drilling and Wells
MM/skad
RECEIVE[)
FEB 0 3 2004
Ala;;ka Oil & Gas Cons. COInn¡ì3:;ion
Anchorûge
...···...1A' L
U ';\ t lJ \ 'l~ .
Alter Casing
Change Approved Program
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchoragé, Alaska
7. KB Elevation (ft):
RKB 24'
1. Operations Performed:
Abandon
) STATE OF ALASKA ) RECEIVED
ALASKA OIL AND GAS CONSERVATION COMMIS~ION 0
REPORT OF SUNDRY WELL OPERATIONS FEB 3 2004
o Suspend 0 Operation Shutdown 0 Perforate 0 A!aska OitJ&imCori.LlCømül"&&i~ 0
o Repair Well 0 Plug Perforations 0 Stimulate 0 Time E~lwaüJ Other 0
o Pull Tubing 0 Perforate New Pool 0 Re-enter Suspended Well 0
4. Current Well Status:
Development 0
Stratigraphic 0
Exploratory 0
Service 0
5. Permit to Drill Number:
203-045 /
6. API Number:
50-103-20453-00
9. Well Name and Number:
3S-23
8. Property Designation:
ADL 25544, ALK 2639
11. Present Well Condition Summary:
10. Field/Pool(s):
Kuparuk Oil Pool
Total Depth
Effective Depth
Casing
Structural
CONDUCTOR
SURFACE
PRODUCTION
Perforation depth:
measured 10535' feet
true vertical 6130' feet
measured 10292' feet
true vertical 5920' feet
Length Size MD
84' 16" 108'
4011' 9-5/8" 4040'
10492' 7" 1 051 9'
Plugs (measured)
Junk (measured)
TVD
Burst
Collapse
108'
2604'
6116'
Measured depth: 10217'-10244'
true vertical depth: 5857'-5880'
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 10143' MD.
Packers & SSSV (type & measured depth) Baker SAB-3 pkr set @ 10111'
SSSV= NIP SSSV= 490'
12. Stimulation or cement squeeze summary:
Intervals treated (measured)
10217'-10244'
43,772# proppant w/7.5 ppa
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Met Water-Bbl Casinq Pressure Tubinq Pressure
Prior to well operation 221 1190 168 260
Subsequent to operation 800 1128 507 270
14. Attachments 15. Well Class after proposed work:
Copies of Logs and Surveys run _ Exploratory 0 Development 0 Service 0
Daily Report of Well Operations _X 16. Well Status after proposed work:
oil0 GasD WAGD GINJD WINJ 0 WDSPLD
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact
Printed Name
Signature
Mike Mooney @ 263-4574
¡¡O;;~
Title
Phone
Wells Group Team Leader
Date -:l. /x ItJ :5
Prepared bv Sharon Allsup-Drake 263-4612
\ l~J. \ t'~ i\ l_
- Bfl"'SUBMla~ICA~~
Form 1 0-404 Revised 2/2003 ·
TUBING
(25-10143,
00:3.500,
10:2.992)
LOCATOR
10095-10096,
00:5.890)
WLEG
10142-10143,
00:4.510)
)
ConocoPhilUpsA.laska, Inc.
,
~i' 1 \%- .
:µ IIJII~
:.: _ ('. w_, " i
.Ii ,'.' II
¡'~ '~':. I".
I'
it'
j .
't_l: III'
1~! . . ..
ifl ;
"1~'. ..: !.f
~ f.:
t: .I"'~- - ",il
'I': II
. >
M
I 1 I
LJ
)
KRU 35-23
Well Type: PROD Angle (â1 TS: 32 deg (â110216
Orig Completion: 4/20/2003 Angle (â1 TD: 30 deg (â11 0535
Last W/O: Rev Reason: GLV design, Tag
fill, Perf,FRAC
Ref Log Date: Last Update: 12/24/2003
TD: 10535 ftKB
Max Hole Angle: 70 deg (â1 2722
Size Top Bottom TVD Wt Grade Thread
7.000 27 10519 6116 26.00 L-80 BTCM
9.625 29 4040 2604 40.00 L-80 BTCM
16.000 29 108 108 62.50 H-40 WELDED
API: 501032045300
SSSV Type: NIPPLE
Annular Fluid:
Reference Log: 24' RKB
Last Tag: 10292
Last Tag Date: 11/28/2003
Casing String· ALL STRINGS
Description
PRODUCTION
SURFACE
CONDUCTOR
Size
3.500
10239 - 10244 5875 - 5880
Stimulations & Treatments
Interval I Date I Type
10217 - 10244 12/7/2003 FRAC
GãsLiff Mátîdrels'Vãtves
St MD TVD Man Man Type V Mfr V Type V OD Latch Port
Mfr
1 3907 2544 CAMCO KBUG-M
2 6475 3744 CAMCO KBUG-M
3 8269 4592 CAMCO KBUG-M
4 9383 5221 CAMCO KBUG-M
5 9996 5673 CAMCO MMG
Other (phJgs, eqÚip;, ètc.) .·.JEWELRY
Depth TVD Type
24 24 HANGER
490 489 NIP
10048 5716 SLEEVE-O
10095 5755 LOCATOR
10096 5755 PBR
10111 5768 PACKER
10135 5788 NIP
10142 5794 WLEG
10143 5795 m
GeneralNotes
Date Note
5/11/2003 TREE: GMC / GEN 5 /5M
TREE CAP CONNECTION: TOP 5.75" ACME with 3.5" EUE 8RD THREAD
Interval
10217 -10219
10219 - 10239
TVD
5857 - 5859
5859 - 5875
Zone
C-4
C-4
Status
Ft SPF Date Type
2 6 4/29/2003 IPERF
20 11 12/4/2003 RPERF
Comment
2.5" HSD PJ, 60 deg phase
2.5" Power Spiral EJ HMX
charQes, 45 deQ ph
2.5" HSD PJ, 60 deg phase
C-4
6
4/29/2003 IPERF
5
I Comment
43,772 # PROP W/7.5 ppa (â1 PERFS
TRO
DMY
DMY
DMY
DMY
DMY
o
o
o
o
o
Date
Run
11/29/2003
11/29/2003
11/28/2003
11/28/2003
11/30/2003
Vlv
Cmnt
1.0
1.0
1.0
1.0
1.5
BK
BK
BK
BK
RK
0.000
0.000
0.000
0.000
0.000
Description
FMC 3.5" GEN 5 TUBING HANGER
CAMCO 'DS' NIPPLE WINO GO PROFILE
BAKER CMU SLIDING SLEEVE W/DS PROFILE
LOCATOR SUB & PBR SEAL ASSEMBLY
BAKER 80-40 PBR
BAKER SAB-3 PACKER W/MILLOUT EXTENSION ID 3.72"
CAMCO 'D' NIPPLE W/2.75" NO GO PROFILE
BAKER PUMP OUT SUB
ID
3.500
2.875
2.813
3.020
3.020
3.250
2.750
2.990
2.992
Date
11/26/03
11/28/03
11/29/03
11/30/03
12/01/03
12/04/03
12/07/03
12/10/03
01/02/04
01/08/04
01/12/04
)
38-23 Event History
')
Comment
JETTED OUT ICE PLUG / BRIDGES FROM 1200' TO 2200' W/ 150 DEG DIESEL. WELL LEFT SHUT IN AND
FP'D W/ DIESEL TO 2300'. FLOWLINE FP'D W/ 10 DIESEL. NOTE: CTU STILL STAGED ON LOC.- UNABLE
TO LOWER MAST DUE TO HIGH WINDS. [HYDRATES-ICE]
TAGGED FILL @ 10292' RKB. EST. 48' RATHOLE. DRIFTED TBG TO TD W/ 2.565" X 23' DUMMY GUN.
INSTALLED DV'S @ 9383' & 8269' RKB. OPEN GLM @ 6475' RKB. IN PROGRESS. [TAG, GLV]
INSTALLED DV'S @ 3907' & 6475' RKB. OPEN GLM @ 9996' RKB. IN PROGRESS. [GLV]
LOADED IA W/ SW & DIESEL CAP. INSTALLED DV @ 9996' RKB. PT IA TO 3000#. GOOD TEST. TBG
TEST NOT SOLID DUE TO SCALED PROFILE. LOST JK RT DOWN HOLE. IN PROGRESS. [PT TBG-CSG,
GLV]
RECOVERED RK-1 RT. PULLED M1-DS SV @ 10048' RKB.
PERFORATE THE INTERVAL 10219'-10239' USING 2.5" POWER SPIRAL ENERJET (20' LOADED). API
INFORMATION: 2.5" POWER SPIRAL EJ HMX CHARGES, 0.39" ENTRANCE HOLE, 36.6" PENETRATION I
25.6 GRAM EXPLOSIVE LOAD. ESTIMATED FILL: 40". WELL LEFT SHUT IN. DID NOT TAG TD.
PUMP FRACTURE TREATMENT USING 30# X-LINK GEL AT 20 BPM. PUMPED 69,304# OF 16/20
PROPPANT, THEN SCREENED OUT WITH 7.5 PPA ON PERFS. PLACED TOTAL OF 43,772# OF
PROPPANT BEHIND PIPE. [FRAC-REFRAC]
CLEAN OUT TO 10,260' CTMD USING SLICK SEAWATER WITH 1.5# BIO SWEEPS. DID NOT GO
DEEPER DUE TO STRIP GUN PERF DEBRIS IN BOTTOM OF WELL. RETURNS OF 1:1 ALL DAY WITH
RETURNS OF PROPPANT. FREEZE PROTECT WELL TO 2500' WITH DIESEL AT END OF JOB. [FCO]
ATTEMPTED TO DRIFT FOR GAS LIFT WORK. FOUND ICE I N TBG. @ 180' SLM, WORKED DOWN TO
187' SLM (STICKY). RECOVERED BAILER W/ ICE-HYDRATES.
JET ICE PLUG FROM 476' TO 478' CTMD USING HOT DIESEL AND VORTECH NOZZLE. CONTINUE TO
RIH AND TAG FILL ABOVE PERFS, SO PERFORMED FILL CLEAN OUT TO 10,260' CTMD. USED DIESEL
WITH 1.5# BIO SWEEPS. LEFT WELL LOADED WITH DIESEL.
TAGGED FILL @ 10,247'RKB, REPLACED 1.5" DV @ 9996'RKB WITH 5/16" OV, JOB COMPLETE [TAG,
GLV]
Page 1 of 1
1/26/2004
ConocóP'hillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
November 26, 2003
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West ih Avenue, Suite 100
Anchorage, AK 99501
)
~€CSlli
/".' V~D
4'~*110¡1 "'.. "O? 200J
~t (1as Cb
~~,
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a short list of wells from the Kuparuk field (KRU). Each of these
wells was found to have a void in the conductor by surface casing annulus. The voids were filled with
cement to the top of the circulation ports in the conductor. As per previous agreement with the AOGCC,
this letter and spreadsheet serves as notification that the treatments took place.
The top-fill operation was completed on November 18,2003. Dowell-Schlumberger batch-mixed Arctic
Set I cement to 15.7 ppg in a blender for each well. The cement was pumped from the bottom of the void
to the top of the conductor on each well via high-pressure hose. The attached spreadsheet presents the
well name, top of cement depth prior to filling, and the number of sacks used on each conductor.
Please call Nina Woods or me at 907-659-7224, if you have any questions.
:~~¡
MJ~
/
ConocoPhillips Problem Well Supervisor
Attachment
:C.\- '\ ~ f'.AC~ «. ~'~f"'\. ~'" ~''-Q. ~t\.\-.
+0 Cr ~ \ \ 'o",,-c- ~,. ö.*~~ b~ ~~
'ž><..xc....<!O.<¡,si:...::. \ \....., ~~""«-"-~~ -\ö s.<;:,~.
À \\ o~+4. "T{)<...,·t ~-\-'"'S ~D<. \:)Q..'"j
f\QOl\ +"'<ê. SûM-ü.~.
~ 0 .Ç.ù ,-\- ""'~, C1. c..~ \ 0 "" t"\(LC!. ~<J..' 'f
ØX/rf7\""d- Á-Ö""S '
ConocoPhillips Alaska, Inc.
Surface Casing by Conductor Annulus Cement Top-off
Kuparuk Field
Well Well TOC Volume Sacks
Name PTO# Type ft BBLS Cement
38-03 2030910 Prod 8 0.6 3.6
3S-07 2021870 Prod 8 1.5 9.1
38-09 2022050 Inj 14 2.5 15.1
3S-1 0 2022320 Prod 12 1.5 9.1
3S-14 2022210 Inj 3 1.5 9.1
3S-15 2022540 Prod 8 0.8 4.8
3S-17 A 2030800 Prod 12 1.1 6.6
38-18 2022060 Prod 10 1.1 6.6
38-19 2030960 Prod 5 1.1 6.6
38-21 2030310 Inj 5 0.5 3.0
38-22 2030110 Inj 7 0.9 5.4
38-23 2030450 Prod 2 0.3 1.8
Schlumbel'ger
NO. 2879
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
06/24/03
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well
Field:
Date BL Color
05/07/03 1
OS/25/03 1
OS/24/03 1
05/10/03 1
05/14/03 1
05/09/03 1
05108/03 1
05/19103 1
04/04103 1
05107/03 1
OS/23/03 1
Job #
Log Description
3S-17 A :'90-g -n~(::' SBHP SURVEY
3S-06 'A. C. ~ -c~ j- PERF RECORD W/SBHP & JEWELRY LOG
3S-08B '4c.~-nL.¡.3 PROD PROFILE WITEMP SURVEY
3S-23 ~Q, ~OtJ..þ) PRODUCTION PROFILE
1 H-17 I q f).. I ?rJ PRODUCTION PROFILE
2U-08 \~~_·O~ \ SBHP SURVEY
1 R-14 c;)ì -Il? \ LDL
3F-01 I'6S-Ð.d.~ PRODUCTION PROFILE
1D-103 [)C(9 ~FFf(ú MEM PSP INJECTION PROFILE
3S-17 A;~O~ -('9f..") 23351 SCMT
3S-06 ¡)K'G -("'f=) T, 23353 SCMT
SIGNE~\ ~ A"-~' ~t. ~~j'V~
DATE:
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
Kuparuk
CD
-.
'--'
}:~ E: C--; E 1 \./ E [)
.- ~ ",I .--;-;;-
, ¡-" ! f .
"",,"..,: ~ .- ~
ß·,;J})(::~ .....:':;,.; ¡,.J>....:.': nt¡~;f}~r~
Sehlußl~IPgep
NO. 2860
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
-,
3S-23
2N-319
2N-343
2N-348
2P-429
2P-420
3J-17
('-.
OS/28/03
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well
Field:
Date BL Color
04/29/03 1
04/27/03 1
05/02/03 1
05/01/03 1
05106103 1
05/06/03 1
05/08/03 1
Job#
Log Description
OCß-O~. PERF & SBHP W/JEWELRY LOG
\ q~ - \ 9 PRESS/TEMP SURVEY
i 9~-0Cì" INJECTION PROFILE
8ð \ '- \ L\" INJECTION PROFILE
~. \ -\rß...MEM PSP INJECTION PROFILE
\.... \ ~~ MEM PSP INJECTION PROFILE
- ~ C¡i (")'-J 4lt; MEMORY LDL
SIGNE~~ )~ ~--9 ~_~ ~__/y~
DATE:
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you.
~~~ \\^ c:...
Kuparuk
CD
RECEIVED
MAY 30 2003
Alaska Ofi & Gas Cons. Commiøeion
Anchorage
')
')
Randy Thomas
Kuparuk Drilling Team Leader
Drilling & Wells
ConocóP'hillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6830
May 23, 2003
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Well Completion Report for 3S-23 (APD # 203-045)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent drilling operations of the Kuparuk well 3S-23.
If you have any questions regarding this matter, please contact me at 265-6830 or
Scott Lowry at 265-6869.
Sincerely,
c\ ~ l~
R. Thomas
Kuparuk Drilling Team Leader
CPAI Drilling
RT/skad
RECEIVED
MAY 2 7 2003
ORIGINAL
Alaska Oil & Gas Cons. Commission
Anchorage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged U Abandoned U Suspended 0 WAG 0
20AAC 25.105 20AAC 25.110
)
1a. Well Status: Oil [2]
Gas U
GINJ 0
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
WINJ 0
WDSPL 0
No. of Completions _
P. O. Box 100360, Anchorage, AK 99510-0360
4a. Location of Well (Governmental Section):
Surface: 2560' FNL, 1246' FEL, Sec. 18, T12N, R8E, UM
At Top Productive
Horizon: 76' FNL, 1650' FWL, Sec. 24, T12N, R7E, UM
Total Depth:
147'FNL,3776'FEL,Sec.24,T12N,R7E,UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 476013 y-
TPI: x- 468814 y-
Total Depth: x- 468668 y-
18. Directional Survey: Yes [2] NoU
5993856
5991087
5991017
Zone-4
Zone-4
Zone-4
21. Logs Run:
GR/Res, Neutron, Density, CCL
22.
Other
5. Date Comp., Susp., 1'1 1b
or Aband.: April ~Õ03
6. Date Spudded:
April 7, 2003
7. Date TD Reached:
April 16, 2003 I
8. KB Elevation (ft):
RKB 28'
9. Plug Back Depth (MD + TVD):
10306' MD 1 5932' TVD
10. Total Depth (MD + TVD):
10535' MD 1 6130' TVD
11. Depth where SSSV set:
Land Nipple @ 490'
19. Water Depth, if Offshore:
N/A feet MSL
CASING SIZE WT. PER FT.
16" 62.5#
9.625" 40#
7" 26#
GRADE
B
L-80
L-80
CASING, LINER AND CEMENTING RECORD
. SETTING DEPTH MD
TOP BOTTOM
Surface 108'
Surface 4040'
Surface 10519'
HOLE SIZE
42'
12.25"
65 bbls ArcticCrete
616 sx ASLite & 341 sx LiteCrete
23. Perforations open to Production (MD + TVD of Top and Bottom
Interval, Size and Number; if none, state "none"):
10217' - 10244' MD 5857' - 5880' TVD 6 spf
)
1b. Well Class:
Development [2] Exploratory 0
Service 0 Stratigraphic Test 0
12. Permit to Drill Number:
203-045 1
13. API Number:
50-103-20453-00
14. Well Name and Number:
3S-23
15. Field/Pool(s):
Kuparuk River Field
Kuparuk Oil Pool
16. Property Designation:
ADL 25544
17. Land Use Permit:
ALK 2639
20. Thickness of
Permafrost:
1707' MD
CEMENTING RECORD
AMOUNT PULLED
8.5"
256 sx Class G w/GasBlock
24.
SIZE
3.5"
TUBING RECORD
DEPTH SET (MD)
10143'
PACKER SET (MD)
10112'
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
N~ N~
26. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift. etc.)
May 9, 2003 Gas Lift Oil
Date of Test Hours Tested Production for OIL-BBL GAS-MCF W A TER-BBL CHOKE SIZE GAS-OIL RATIO
5/10/2003 3.75 hours Test Period --> 297 104 0 100% 462
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF W A TER-BBL OIL GRAVITY - API (corr)
press. 252 psi 114 24-Hour Rate -> 1767 816 0 not available
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas.o~r_~ate~ (att~ch separate sheet, if necessaryh E C E I VE D
Submit core chips; if none, state "none". i . ~
; _1.:iiL~.j
NONE
RBDMS BFt
GF
NAY 3 n ínni
...:;4j¿~~:_-~,
q ,-, . ....~.....(... ~lo11:1. -. ,11:'" <1\;;"..,''''', ~ 'I,
Form 10-407 Revised 2/2003
CONTINUED ON REVERSE SIDE
ORIGINA'-
MAY 2 7 Z003
Alaska Oil & Gas Cons. Commission
Anchorage
Submit in duplicate
28.
)
29.
)
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None".
3S-23
Unit D
UnitC
10216'
10216'
5856'
5856'
N/A
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact:
Scott Lowry @ 265-6869
Printed Nal1J.f!
Signature \
R. Tþðm~ ( _ Title:
~-', \ ~ne
Kuparuk Drilling Team Leader
Date
Ç(2.3~1
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 1 0-407 Revised 2/2003
)
')
. .. .. ..........QÓnqçpJ?hillip§Alä$ka.. ... ........... ...
. . .. . . ... . .... "'
... ........ .... . ..... '. ". .... ".. .. .. .. ......
.·ºipèrati()l1s·Sl..nnma~Y.··RêPQrt.. ......
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Dáte
38-23
3S-23
ROT - DRILLING
N1268@ppco.com
Nabors 7E8
4/6/2003
From...; To HQurs.····Cöde SUb Phase.
COde
15:30 - 17:00 1.50 MOVE MOVE MOVE
17:00 - 19:00 2.00 MOVE MOVE MOVE
19:00 - 22:00 3.00 MOVE MOB MOVE
22:00 - 00:00 2.00 MOVE RURD MOVE
00:00 - 02:00 2.00 MOVE MOVE MOVE
41712003
Start: 4/6/2003
Rig Release: 4/20/2003
Rig Number:
Spud Date: 4n/2003
End: 4/20/2003
Group:
. ··qescriþtibnöf qperations·
Moved Rig Off 3S-21
Set Rig Mats by Well, Set in Wellhead, Tree & 20" Riser in Cellar
Moved Rig Over Well
Set in Mud Pits (Had to Remove Stairs on Well House by Pits) Began
Laying Berm for Ball Mill
Spot Ball Mill, Injection Skid and upright diesel tank - berm around
same. Began taking on water in pits @ 0100 hrs.
Accepted rig @ 0000 hrs due to credit for time spent removing
wellhouse, clearing snow around well and ladder from second
wellhouse.
ACCEPTED RIG @ 0000 HRS 4171103
02:00 - 05:00 3.00 MOVE RURD RIGUP NU riser and berm cellar - take on 290 bbls of mud in pits.
05:00 - 07:00 2.00 MOVE RURD RIGUP Change out drive sub on Top Drive to 41/2" IF - Redress iron
roughneck for 5" pipe.
07:00 - 07:30 0.50 RIGMNT RGRP RIGUP Broke die in grabber making up saver sub - replace dies.
07:30 - 08:30 1.00 MOVE RURD RIGUP Finish work on iron roughneck - PU 5" elevators - move bit, and small
bha componets onto rig floor.
08:30 - 12:00 3.50 MOVE RURD RIGUP PU and stand back 105 joints of 5" drill pipe.
12:00 - 13:30 1.50 MOVE RURD RIGUP PU and stand back 23 jts of HWDP, drilling jars and 3 flex collars.
13:30 - 15:00 1.50 MOVE RURD RIGUP MU BHA #1: Bit, MM @ 1.5 degree, FS, stab, Flex collar, MWD, UBHO,
stab, xo, scribe tools.
15:00 - 15:30 0.50 MOVE SFTY RIGUP Held safety meeting with Rig team to discuss drilling procedures without
a Divertor. Tested Rig evacuation alarm and gas detectors, Pad
Evacuation Siren and Rig ESD station at drillers console - all system
100%.
Held table top Rig Evacuation Drill with rig team.
15:30 - 15:45 0.25 MOVE SFTY RIGUP PJSM with Halliburton Slickline crew on rig up and operations of gyro
surveying.
15:45 - 16:30 0.75 MOVE RURD RIGUP Fill conductor and check for leaks - pressure test mud lines to 3500 psi
- hung Top slickline sheive. Clean out Conductor from 92' to 108'.
16:30 - 17:30 1.00 DRILL DRLG SURFAC Drill from 108' to 178' - 400 gpm 1700 psi I 60 rpm
17:30 - 18:00 0.50 DRILL SURV SURFAC Blow down Top Drive - run gyro survey @ 86'.
18:00 - 19:30 1.50 DRILL DRLG SURFAC Drill from 178' to 269' 400 gpm 1725 psi 160 rpm.
19:30 - 20:00 0.50 DRILL SURV SURFAC Blow down Top Drive - Run gyro survey @ 173'.
20:00 - 21 :00 1.00 DRILL DRLG SURFAC Drill from 269' to 360' 450 gpm I 950 psi I 60 rpm
21 :00 - 21 :30 0.50 DRILL SURV SURFAC Blow down Top Drive - run gyro survey @ 263'
21 :30 - 00:00 2.50 DRILL DRLG SURFAC Drill from 360' to 571' survey with MWD.
From Spud: ART =2.0 AST =2.25
440 gpm 11100 psil 65 rpm
PUW 58K SOW 58K RWT 58K
Torque on I off 2000/1000
4/8/2003 00:00 - 12:00 12.00 DRILL DRLG SURFAC Drill, Slide & Survey 12 1/4" Hole from 571' to 1,592' MD/1 ,468' TVD
(1,021'), ART .91 Hrs, AST 7.7 Hrs, 30-40K WOB, 65 Rpm's, 450 Gpm,
Off Btm Press 1,250 psi, On Btm 1,400 psi, Off Btm Torque 3k Ft#'s,
On Btm 6K Ft#'s, Rot Wt 77K, Pu Wt 84K, Dn Wt 70K, Note: RD HES
Slickline @ 02:00 Hrs
12:00 - 00:00 12.00 DRILL DRLG SURFAC Drill, Slide & Survey from 1,592' to 2,650 MD/2,OOO' TVD (1,058'), ART
2.29 Hrs, AST 6.25 Hrs, 30-40K WOB, 85 Rpm's, 500 Gpm, Off Btm
Press 1,650 psi, On Btm 1,750 psi, Off Btm Torque 5.5k Ft#'s, On Btm
6.5K Ft#'s, Rot Wt 78K, Pu Wt 92K, Dn Wt 58K,
4/9/2003 00:00 - 02:30 2.50 DRILL DRLG SURFAC Drill, Slide & Survey from 2,650' to 2,784 MD/2,039' TVD (134'), ART
-0-, AST 1.5 Hrs, 30-40K WOB, 85 Rpm's, 500 Gpm, Off Btm Press
Printed: 5/13/2003 2:55:55 PM
)
')
. ... ... ......
... ... ......"... .. .." . . .".. .... ........... ..
. . . .... ... . . . .... ... . .. . . .. ." .
. . .·····.·.··.···iHdn9çQPhHllip~:AI~sl<~...·..........···· ..¡.
.. . .. ... ....... ...... .. ... .... ....... ..".. ..... .
.··()pêrátions···~Ûn'1.ma~y: .fI~pqrt
1,650 psi, On Btm 1,750 psi, Off Btm Torque 5.5k Ft#'s, On Btm 6.5K
Ft#'s, Rot Wt 75K, Pu Wt 90K, Dn Wt 62K,
MWD Failed, Unable to Control Angle or Direction with MWD. Pumped
Weighted Sweep & Circ 2 Btms Up
Monitored Well-Static, POOH, Pulled Tight at 1,810', Backreamed Out
from 1,810' to 1,372', (Thru Permafrost) POOH to Bit
Inspected Bit & BHA, LD UBHO Sub, Pulled Pulser/Dir. Probe from
MWD, Changed Out Hang Off Sub, Ck Scribe on MM, Ck Ok, RR Bit,
Loaded MWD & RIH
1.25 DRILL DEQT SURFAC Surface Test MWD & Failed, Remove Pulser & Changed Out Same,
MU New Pulser/Dir Probe & Re-Installed, Retested & Ck Ok
2.25 DRILL TRIP SURFAC RIH, Set Down at 1,677', Pumped Thru WINo Problem, Took Ck Shots
at 2,030' and 2,406' & Ck Ok, Cont TIH, with No Problems, Washed 90'
to Btm, Had 3' of Fill
10.50 DRILL DRLG SURFAC Drill, Slide & Survey from 2,784' to 3,485' MDI 2,347' TVD (701'), ART
2.6 Hrs, AST 5.4 Hrs, 30-40K WOB, 85 Rpm's, 550 Gpm, Off Btm
Press 2,000 psi, On Btm 2,100 psi, Off Btm Torque 6.5k Ft#'s, On Btm
7.5K Ft#'s, Rot Wt 78K, Pu Wt 95K, Dn Wt 62K, 9.4 ppg MW, 150 Vis
in Hole
Drill from 3,485' to 4,050' MDI 2,608' TVD (565') ART 4.46 Hrs, AST .2
Hrs, 40 K WOB, 85 Rpm's, 560 Gpm's, 2,370 Psi, Off Btm Torque 6.5K
Ft#'s, On Btm 8.5K Ft#'s, Rot Wt 83K, Up Wt 105K, Dn Wt 70K
Pumped Weighted Sweep & Circ Out, Had Large Amount of Cuttings
Back, Pumped 2nd Weighted Sweep with little Change, Circ Total of 4X
Btms Up at 600 Gpm, 2,600 Psi & 85 Rpm's
Monitored Well-Static, POOH to BHA with No Problems
POOH & LD BHA, Cleared Rig Floor
RU Nabors Csg Equipment with Nabors Fill Up Tool
Held PJSM with Co-Man & Rig Crew on Running 9 5/8" Csg
MU 9 5/8" Float Shoe, 2 Jts 9 5/8" 40# L-80 BTC Csg with 95/8" Fit
Collar, Thread Locked Jts Below Fit Collar, Tested Float Equipment and
Nabors Fill Up Tool Failed
LD Nabors Fill Up Tool & Mu Franks Fill Up Tool, Retested Fit Equip &
CkOk
Cont RIH with 9 5/8" Csg to 3,050', Broke Circ at 965',1,919' and
2,863', Circ at 5 Bpm at 280 Psi, PU WT 128K, Dn Wt 68K
Fin RIH with 95/8",40# L-80 BTC Csg, Ran a Total of 105 Jts with 16
Bow Spring Cent, Total Ran Including Fit EQuip, 4,040.24', Landed Csg
in Hanger
Circ Btms Up with Fill Up Tool
RD Franks Fill Up Tool & MU Cement Head
Circ & Cond Mud for Cmtg Csg, Lowered YP from 44 to 27, Final Circ
rate 6.5 Bpm at 400 Psi, Last 50 bbls of mud pumped had Nut plug for
Marker, Reciprocated Pipe with Full Returns, Up Wt 190K, Dn Wt 90K.
Held PJSM on Cmtg Csg
1.50 CEMENT PUMP SURFAC RU Dowell, Pumped 5 bbls CW 100 Chern Wash, Tested Lines to
3,000 Psi, Pumped 45 bbls CW 100 Chern Wash at 8.3 ppg @ 7 Bpm
@ 290 Psi, Dropped Btm Plug, Pumped 50 bbls of 10.5# Mudpush
spacer @ 7.0 bpm @ 320 Psi with Red Dye in Spacer, Mixed &
Pumped 470 bbls, 616 sxs of Lead Cmt. Arctic Set @ 10.7 ppg & 4.28
Yield, Ave rate 8.5 bpm @ 370 Psi, , Observe Nut Plug at Shaker
Switched to Tail Cmt, Pumped 341 sxs (136 bbls) of Lite Crete Cmt @
12.0 ppg & 2.24 Yield,Pumped @ 8.25 Bpm @ 475 Psi,
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
38-23
38-23
ROT - DRILLING
N1268@ppco.com
Nabors 7ES
. :Datè From~"'6 · Hours Code SUb . Phase
· · Code
4/9/2003 00:00 - 02:30 2.50 DRILL DRLG SURFAC
02:30 - 03:45 1.25 DRILL CIRC SURFAC
03:45 - 08:00 4.25 DRILL TRIP SURFAC
08:00 - 10:00 2.00 DRILL DEQT SURFAC
10:00 - 11: 15
11:15 -13:30
13:30 - 00:00
4/10/2003 00:00 - 07:30 7.50 DRILL DRLG SURFAC
07:30 - 10:00 2.50 DRILL CIRC SURFAC
10:00 - 14:00 4.00 DRILL TRIP SURFAC
14:00 - 16:00 2.00 DRILL PULD SURFAC
16:00 - 17:30 1.50 CASE RURD SURFAC
17:30 - 17:45 0.25 CASE SFTY SURFAC
17:45 - 18:00 0.25 CASE RUNC SURFAC
18:00 - 19:15 1.25 CASE RURD SURFAC
19:15 - 00:00 4.75 CASE RUNC SURFAC
4/11/2003 00:00 - 02:30 2.50 CASE RUNC SURFAC
02:30 - 03:00 0.50 CEMENTCIRC SURFAC
03:00 - 03:30 0.50 CEMENT RURD SURFAC
03:30 - 05:00 1.50 CEMENT CI RC SURFAC
05:00 - 06:30
Start: 4/6/2003
Rig Release: 4/20/2003
Rig Number:
8pud Date: 4/7/2003
End: 4/20/2003
Group:
.. . .. . . : . . . . . .. . .. . . .
.:... iDesCriptiønof()pera~i°rls.
Printed: 5/13/2003 2:55:55 PM
-)
')
. "' . ... ......
.. . ...
··...·..·þpbqcoF?nillips ..AI.ª$kå··.·
. . ... .. .. .........
.. .... . .... ... . ..' .. .. "... ..
... . .............. ... ..... . . ... ... ............
..opet~tiQns.Slln1l11ary·..Report·· ......
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
3S-23
3S-23
ROT - DRILLING
N1268@ppco.com
Nabors 7ES
Start: 4/6/2003
Rig Release: 4/20/2003
Rig Number:
Spud Date: 4n/2003
End: 4/20/2003
Group:
D.··.a. te.· .... ... FrOh1-ToHou.· .r$ C.·..·.o.de.·. Sub··. Pha.se..·
Code
Description of Qpefätiors .
4/11/2003 06:30 - 07: 15 0.75 CEMENTDISP SURFAC Dropped Top Plug & Dowell Pumped 20 bbls Wash Water, Turned over
to Rig, Rig Pumped 280 bbls of 9.4 ppg mud, Ave Disp Rate 7.5 bpm
@ 700 Psi, Reciprocated Pipe Until 60 bbls of Lead Cmt was Out of
Shoe-Landed Csg, Slowed to 3 bpm @ 435 Psi, Bumped Plug to 1,000
Psi, Displ Calc 95% Eff on Rig Pumps, Had 250 bbls of 10.7 ppg Cmt
back to Surface, Had Full Returns throughout Job- CIP at 07:15 Hrs
4/11/03, Check Floats & Held
07:15 - 08:15 1.00 CEMENT RURD SURFAC Blow Down Cmt Lines & RD Cement Head & Lines
08:15 - 11 :00 2.75 CASE RURD SURFAC Began Backing Out Landing Jt 4 Rds & Stopped, RU Rig Tongs &
Collapsed Landing Jt, ND Riser
11 :00 - 13:30 2.50 CASE RURD SURFAC Rough Cut Landing Jt & LD, Cut Out Running Tool from Hanger, FMC
Inspected Hanger & Ck Ok
13:30 - 15:00 1.50 WELCTL NUND SURFAC NU 11" 5M Gen V Csg Head & Tbg Spool, Tested M/M Seals to 1,000
psi, Tested Ok,
15:00 - 21 :00 6.00 WELCTL NUND SURFAC ND Annular Preventor, Installed Stack Lifting Plate, NU Annular, NU
Adapter Spool, Set on 135/8" 5M Stack & NU
21 :00 - 21 :30 0.50 CASE RURD SURFAC RD Csg Equipment from Rig Floor & Changed Out Elevator Bails
21 :30 - 00:00 2.50 WELCTL BOPE SURFAC RU Test Equip, Began Testing BOP's, Tested Annular to 250 Psi Low,
3,500 PSi High, Began Testing Rams and Choke Manifold to 250 psi
Low & 5,000 Psi High
NOTE: Lou Grimaldi with AOGCC Witnessed Testing
4/12/2003 00:00 - 03:00 3.00 WELCTL BOPE SURFAC Cont Testing BOP's to 250 Psi Low & 5,000 Psi, Manual Valve on Kill
Line Failed
Note: Lou Grimaldi with AOGCC Witnessed Testing
03:00 - 03:30 0.50 WELCTL OTHR SURFAC Pulled Test Plug & Installed Wear Bushing, LD Test Jt
03:30 - 09:30 6.00 DRILL PULD SURFAC PU 108 Jts of 5" DP from Pipe Shed & TIH Open Ended, POOH and
Stood Back 36 Stds
09:30 - 11 :45 2.25 WELCTL BOPE SURFAC Pulled Wear Bushing & Installed Test Plug, Tested Manual Valve on Kill
Line to 250 Psi & 5,000 Psi, Pulled Test Plug & Re-Installed Wear
Bushing
11:45-15:15 3.50 DRILL PULD SURFAC MU 8 1/2" BHA #3, Oriented & Uploaded MWD
15:15 - 15:30 0.25 DRILL SFTY SURFAC Held PJSM with Sperry Sun on Loading Radioactive Sources
15:30 - 16:30 1.00 DRILL TRIP SURFAC Loaded Radioactive Sources and TIH with BHA to 926'
16:30 - 18:30 2.00 RIGMNT RSRV SURFAC Cut & Slip 92' of Drlg Line and Serviced Top Drive
18:30 - 21 :30 3.00 DRILL TRIP SURFAC TIH with BHA #3 PU 5" DP from Pipe Shed to 3,874'
21 :30 - 22:30 1.00 DRILL CIRC SURFAC Washed 60' from 3,874' to 3,934', without Tagging Hard Cmt, Circ Btms
Up for Csg Test, 9.0 ppg Mw In & Out, Circ at 250 Gpm's at 515 Psi
22:30 - 23:30 1.00 DRILL DEaT SURFAC RU & Tested 9 5/8" Csg to 2,500 Psi for 30 Min, Good Test
23:30 - 00:00 0.50 DRILL DRLG SURFAC Cleaned Out Cement from 3,934' to 3,960', Drlg on Cmt Plugs at Report
Time, 450 Gpm's at 1,250 Psi, 40 Rpm's
4/13/2003 00:00 - 01 :30 1.50 DRILL DRLG SURFAC Drilled Out Float Collar at 3,962', Shoe Jts and Float Shoe at 4,040',
Drilled 20' of New Form to 4,070' MDI 2,618' TVD, 5-10 WOB, 40
Rpm's, 450 Gpm, 1,350 Psi
01 :30 - 02:30 1.00 DRILL CIRC SURFAC Circ Btms Up and Displaced 9.0 ppg Mud with New 8.8 ppg LSND Mud
02:30 - 03:30 1.00 DRILL LOT SURFAC RU & Performed LOT to 14.1 ppg EMW, With 8.8 ppg MW Leaked Off
at 720 Psi.
03:30 - 04:00 0.50 DRILL CIRC SURFAC Circ Hole & Est ECD Baseline and Slow Pump Rates
04:00 - 12:00 8.00 DRILL DRLG INTRM1 Drill 8 1/2" Hole from 4,070' to 5,060' MDI 3,084' TVD, (990'), ART 4.57
Hrs, AST .55 Hrs, 15-20K WOB, 90 Rpm's, 185 Spm, 545 Gpm, Off
Btm Press 1,600 Psi, On Btm 1,750 PSi, Off Btm Torque 9K Ft#'s, On
Btm 8K Ft#'s, Rot Wt 90K, Up Wt 135K, Dn Wt 90K, 9.2 ppg MW with
10.9 ECD, Pumping Wt'd Sweeps Every 3-400'
12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill from 5,060' to 6,284' MDI 3,656' TVD, (1,224') ART 7.88 Hrs, AST
Printed: 5/13/2003 2:55:55 PM
)
)
. . .. . .
..... ...... ..... ...(JprlocQPhillipsAICiska .... ...................
.... . . . . ....... . . "'
. ... .. . .,"..... .. . '".. .. ... .... ... ,... .... ... . . . ... ...
··QpE!r~~ions$Qrnn1äryFr~p()rt
Legal Well Name: 3S-23
Common Well Name: 3S-23 Spud Date: 4/7/2003
Event Name: ROT - DRILLING Start: 4/6/2003 End: 4/20/2003
Contractor Name: N1268@ppco.com Rig Release: 4/20/2003 Group:
Rig Name: Nabors 7ES Rig Number:
. Date · Frorn '-To HourS Cpge Sub ··pèscriptiöho10þerations
.. · CÖ.de
4/13/2003 12:00 - 00:00 12.00 DRILL DRLG INTRM1 .5 Hrs, 20-25K WOB, 100 Rpm's, 190 Spm, 550 Gpm, Off Btm Press
1,850 Psi, On Btm 2,200 Psi, Off Btm Torque 10K Ft#'s, On Btm 10.5K
Ft#'s, Rot Wt 98K, Up Wt 155K, Dn Wt 83K, 9.5 ppg MW with 11.5
ECD, Max ECD 12.3 Prior to Pumping Wt'd Sweeps, Pumping Sweeps
every 2-300'
4/14/2003 00:00 - 03:15 3.25 DRILL DRLG INTRM1 Drill from 6,284' to 6,568' MDI 3,784' TVD, (284') ART 1.7 Hrs, AST .5
Hrs
03: 15 - 03:30 0.25 RIGMNT RGRP INTRM1 Replaced Valve Spring on #2 Mud Pump
03:30 - 12:00 8.50 DRILL DRLG INTRM1 Drill from 6,568' to 7,504' MDI 4,211' TVD, (936'), ART 5.22 Hrs, AST
-0-, 20-25K WOB, 100 Rpm's, 185 Spm, 545 Gpm's, Press Off Btm
2,275 Psi, On Btm 2,450 Psi, Off Btm Torque 14K Ft#'s, On Btm 13K
Ft#'s, 10.0 ppg MW with 11.9 ECD, Pumping Wt'd Sweeps at 2.5 #
Over MW every 3-400', Rot Wt 105K, PU Wt 195K, Dn Wt 85K
12:00 - 17:00 5.00 DRILL DRLG INTRM1 Drill from 7,504' to 8,163' MDI 5,435' TVD, (659'), ART 2.51 Hrs, AST
.67 Hrs
17:00 - 18:00 1.00 RIGMNT RGRP INTRM1 Changed Out Liner Gasket on #2 Mud Pump
18:00 - 00:00 6.00 DRILL DRLG INTRM1 Drill from 8,163' to 8,745' MDI 4,848' TVD, (582') ART 3.07 Hrs, AST .6
Hrs, 20-25K WOB, 100 Rpm's, 185 Spm, 545 Gpm's, Off Btm Press
2350 Psi, On Btm 2,680 Psi, Off Btm Torque 17K Ft#'s, On Btm 14K
Ft#'s, 10.0 ppg MW with 11.6 ECD, Pumping Wt'd Sweeps every 3-400'
with Good Results, Rot Wt 123K, Up Wt 223K, Dn Wt 85K
4/15/2003 00:00 - 17:00 17.00 DRILL DRLG INTRM1 Drilled 8.5" directional hole from 8755' to 10,208'. ART 9.17 Hrs. AST
1.68 Hrs. Up Wt. 230 K Down 105 K Rot Wt. 130 K. Torque off Btm.
15000 On Btm 18000 FPS. TD RPM 100 WOB 25 K.
17:00 - 19:30 2.50 DRILL CIRC INTRM1 Circulated Sweep and cleaned up hole.
19:30 - 00:00 4.50 DRILL WIPR INTRM1 POOH for wiper trip. 30 - 40 K drag. Backreamed from 9856' to 9389'.
continue POOH to 6318'.
4/16/2003 00:00 - 02:00 2.00 DRILL WIPR INTRM1 POOH to 3996'. Tight at 6318' and 5745'.
02:00 - 03:00 1.00 RIGMNT RSRV INTRM1 Serviced Top Drive.
03:00 - 07:00 4.00 DRILL WIPR INTRM1 RIH to 10,208' washed down last stand for precaution.
07:00 - 11 :00 4.00 DRILL CIRC INTRM1 Circulated and pumped sweep. Max gas 450 IU. ECD started at 13.4
and declined to 12.4.
11 :00 - 18:00 7.00 DRILL DRLG INTRM1 Drilled 8.5" directional hole from 10,208' to 10,535'. Control drilled ~
across sand 50 to 60 FPH. Up Wt. 235 K. Down Wt. 115 K. Rot Wt.
153 K. Torque off Btm. 21000 On Btm. 18000 Ft Lbs. TD 100 RPM
WOB 25 K. ART 5.14 Hrs. Top of sand 10,220' MD 5859' TVD. Bottom
of sand 10,243' MD 5878' TVD. Max gas 450 IU.
18:00 - 19:30 1.50 DRILL CIRC INTRM1 Circulated BU X 2.
19:30 - 22:00 2.50 DRILL WIPR INTRM1 Made 15 stand wiper trip to 9107'. Back reamed from 10235' to 9670'.
No problem RIH.
22:00 - 00:00 2.00 DRILL CIRC INTRM1 Pumped sweep and circulated well.
4/17/2003 00:00 - 02:00 2.00 DRILL CIRC INTRM1 Circulated hole clean with 4 BU. Spotted 30 Bbls LCM @ 20 PPB.
02:00 - 10:00 8.00 DRILL TRIP INTRM1 POOH to run casing. Tight @ 10213',10147',10100',6315', and 6181'.
Over pull 30 - 65 K worked pipe through all tight spots.
10:00 - 14:00 4.00 DRILL PULD INTRM1 Laid down BHA and cleaned off rig floor.
14:00 - 14:30 0.50 DRILL OTHR INTRM1 Pulled wear bushing.
14:30 - 16:00 1.50 CASE RURD INTRM1 Rigged up to run casing.
16:00 - 16:15 0.25 CASE SFTY INTRM1 Pre job safety meeting.
16:15 - 22:00 5.75 CASE RUNC INTRM1 Ran 96 Jts 7" 26 # L-80 BTC casing. Broke circ. @ 2108'.
22:00 - 22:45 0.75 CASE CIRC INTRM1 CBU 215 GPM @ 420 PSI.
22:45 - 00:00 1.25 CASE RUNC INTRM1 Ran 27 Jts 7" 26 # L-80 BTC casing to 4920'.
4/18/2003 00:00 - 05:30 5.50 CASE RUNC INTRM1 Ran 7" casing from 4920' to 8180'. Broke circulation at 6165'. Last 10
Jts. No returns.
Printed: 5/13/2003 2:55:55 PM
)
')
·çonoÞÓF>h.illips.·AI.i3.Sl<ét: ·
"pertltionsSLJrnrnarY:Report ..
CBU at 8180'.5 BPM @ 740 PSI. Good returns.
Ran 7" casing from 8180' to 10519'. Broke circulation at 8993' and
9803'.
CBU gas 60 IU.
Laid down fill up tool and made up cement head.
Circulated and conditioned hole for cement job. Batch mixed cement
and held PJSM.
Rig Dowell, Batch mix 40 bbls CW1 00 @ 8.3 ppg, 50 bbls MudPUSH
@ 12.5 ppg, 256 sxs (53.5 bbls) @ 15.8 ppg GasBLOK wI Class G +
.030%BWOC B155, .300%BWOC 065, 2.000 gallsk D600G, .200
gal/sk 047, Pump 10 bbls CW100, Test lines to 3500 psi, Pump 30 bbls
CW100, Drop #1 btm plug, Reload head, Pump 50 bbls MudPUSH at
rate of 6 bpm at 700 psi, Drop #2 btm plug, Pump 53.5 bbls cmt at rate
of 6.0 bpm at 650 to 500 psi, Shut down, Flush lines to rig floor with
seawater, Drop top plug, Dowell Displace 350 bbls seawater at rate of
7.0 bpm at 1000 psi slowed rate to 5 bpm at 960 psi after 380 bbls
slowed rate to 3.0 bpm @ 1250 psi & bumped plug wI total of 402.2.0
bbls seawater, Bumped plug wI 1750 psi, Bled back 2.5 bbls for a total
of 399.8 total bbls displaced, CIP @ 1730 hrs 4/18/03, Had good circ.
thru out job, Displaced entire job with Dowell. Casing stuck prior to
start of cement job.
Laid down cement head and flushed out stack.
Backed out and laid down landing joint. Changed out bales.
Installed and tested packoff to 5000 PSI.
Pre job safety meeting.
Ran Completion on 3 1/2" 9.3# L 80 EUE 8 rd mod tubing. 62 Jts. in
hole.
Run 3-1/2",9.3#, L-80, EUE 8rd Completion string to 7792'
Rig & test 7" casing to 3500 psi fl 30 min.- OK
Drop packer setting ball, Perform 7"x 9-5/8" injectivity test wI 685 psi,
2604' TVD= EMW of 16.4 ppg Note; Flushed 7" x 9-5/8" annulus
with 230 bbls fresh water at 3 bpm @ 960 psi, followed by 60 bbls
diesel for freeze protection.
1.00 CMPL TN PCKR CMPL TN Circ. 2-3 bpm to seat ball. Will set SAB-3 packer @ 10111.52', Slowly
pressure 3-1/2" tbg. to 2500 psi. Wait 5 min. Bleed pressure to zero.
Slack off to 45K (15K on pkr) to comfirm packer set, then pressure tbg
string to 3000 psi and hold 5 min. Bleed pressure to 1500 psi. PU to
170K (45K over) & shear PBR. Bleed pressure to zero. Slack off, tag
locator wI 15K. Pressure tbg to 3600 psi to shear ball seat. Bleed off all
pressure.
1.00 CMPL TN PCKR CMPL TN Pull jt. #320 out of hole (pulling 12' out of PBR). M/U 3-1/2" FMC tubing
hanger on jt. # 319, Use jt. #320 as landing jt., RIH & land tubing wI
locator 2' above fully located in PBR, RILDS. Rig pumping lines
1.00 CMPL TN DEOT CMPL TN Pressure 3-1/2" tubing to 3500 psi fl5 min. - lost 200 psi (Observed
small stream coming out of 3-1/2" x 7" annulus), Bled tbg. press. to
1500 psi, Pressure 3-1/2" x 7" annulus to 3500 psi fl5 min (Lost 200 psi
on annulus and loosing- Pressure on tubing increase to 2000 psi and
raising). Bleed tbg pressure to zero and attempt to shear RP (RP
appeared to shear slowly). Pressure annulus to 1000 psi & pressure
held. Repressure tbg to 1500 psi & annulus to 3500 psi, bled tbg
pressure to "0" & shear RP valve sheared wI 1200 psi on tbg). Bleeding
both sides to zero. All test were charted.
1.75 CMPL TN RURD CMPL TN Lay down landing joint, Install FMC Double check valve.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
3S-23
3S-23
ROT - DRILLING
N 1268@ ppco.com
Nabors 7ES
: Datè
From-To HoUrsCòde .£6£ePhaše
4/18/2003
05:30 - 06:30 1.00 CASE CIRC INTRM1
06:30 - 11 :30 5.00 CASE RUNC INTRM1
11 :30 - 12:30 1.00 CASE CIRC INTRM1
12:30 - 13:00 0.50 CASE RURD INTRM1
13:00 - 15:30 2.50 CEMENTCIRC INTRM1
15:30 - 17:30 2.00 CEMENT PUMP INTRM1
17:30 - 18:30 1.00 CEMENT PULD INTRM1
18:30 - 19:30 1.00 CEMENT PULD INTRM1
19:30 - 20:15 0.75 CASE DEQT INTRM1
20:15 - 20:30 0.25 CMPLTN SFTY INTRM1
20:30 - 00:00 3.50 CMPL TN RUNT INTRM1
4/19/2003 00:00 - 09:00 9.00 CMPL TN RUNT CMPL TN
09:00 - 10:00 1.00 CMPL TN DEOT CMPL TN
10:00 - 11 :00 1.00 CMPL TN OTHR CMPL TN
11 :00 - 12:00
12:00 - 13:00
13:00 - 14:00
14:00 - 15:45
Start: 4/6/2003
Rig Release: 4/20/2003
Rig Number:
Spud Date: 4n/2003
End: 4/20/2003
Group:
. .
. .. . ... .",
. ··Désbriþtion ofOpèrations
Printed: 5/13/2003 2:55:55 PM
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
3S-23
3S-23
ROT - DRILLING
N 1268@ ppco.com
Nabors 7ES
Date·
.~. ..~ ...~ .. . Sub . ~
From- To . · Hours .. Code Cdde... Phase
4/19/2003
15:45 - 18:00 2.25 WELCTL NUND CMPL TN
18:00 - 20:00 2.00 WELCTL NUND CMPL TN
20:00 - 20:30 0.50 CMPL TN FRZP CMPL TN
20:30 - 22:00 1.50 CMPL TN FRZP CMPL TN
22:00 - 00:00 2.00 CMPL TN OTHR CMPL TN
00:00 - 04:30 4.50 CMPL TN OTHR CMPL TN
04:30 - 07:00 2.50 RIGMNT RSRV CMPL TN
4/20/2003
Start: 4/6/2003
Rig Release: 4/20/2003
Rig Number:
Spud Date: 4/7/2003
End: 4/20/2003
Group:
. .
Descfiptioh.of OÞ~~élti()ns .
Nipple down BOP.
Nipple up Xmas tree and tested to 5000 PSI. /
Pulled Double check valve and Rigged up to pump Freeze protection.
Pump 152 Bbls diesel with Little Red while laying down excess DP from
derrick.
Continue laying down DP from derrick. Rigged up FMC lubricator and
installed back pressure valve while laying down DP. "
Laid down excess DP form derrick.
Slip and cut drilling line and serviced top drive. Released rig @ 0700
Hrs. 4/20/03.
Printed: 5/13/2003 2:55:55 PM
Date
04/22/03
04/23/03
04/25/03
04/26/03
04/29/03
05/10/03
')
)
35-23 Event History
Comment
DRIFTED TBG & TAGGED W/ 221 X 2.511 HC DMY GUN @ 103181 RKB, EST. 74' BELOW TARGET BTM
PERF @ 102441 RKB. PULLED SOV & SET DV @ 99961 RKB. ATTEMPT prr TBG 3000 PSI, IA TRACKING,
VERY SLOW LEAK, 300 PSI LOSS (TBG) 100 PSI GAIN (IA) IN 15 MIN. IN PROGRESS.
SET SV IN D NIPPLE @ 101351 RKB. prr TBG 3000 PSI, NO INCREASE IN IA PRESSURE (800 PSI)
PASSED. PRESSURE TBG TO 4000 PSI TO SET PKR, NO INCREASE IN IA PRESSURE (850 PSI) PULLED
SV @ 101351 RKB. prr TBG, PKR TO 3000 PSI, TBG / IA COMMUNICATION. prr IA 3000.
PRESSURE TEST TBG / PKR 3500 PSI, FAILED, IA COMMUNICATION. SET 2.7511 CA2 PLUG @ 10135'
RKB. PRESSURE TBG TO 4000, 4400 & 4800 PSI TO SET PKR, IA HELD SOLID EACH TEST. IN
PROGRESS. [ANN COM ISSUES]
PULLED 2.7511 CA2 @ 101351 RKB. MITT 3500 PSI, PASSED. MITIA 3500 PSI, PASSED. PKR SET &
HOLDING. [ANN COM ISSUES]
TAGGED PBTD AT 103061, RAN GR/CCL LOG FROM 10305' TO 99901, PERFORATED 102171-102441, 6 SPF
WITH 1100 PSI UNDEBALANCE, SBHP= 3361.6 PSIA AT 102311 AND 3288.2 PSIA AT 100311 [TAG, PERF,
PRESSURE DATA]
PPROF. LOG PASSES AT 100/120/140/160 FPM (TOOLS WOULD NOT FALL AT SLOWER SPEEDS).
LOG 15-MINUTE STATIONS ABOVE AND BELOW PERFS. WELL PRODUCING 1800 BOPD, NO GAS LIFT,
FWHP = 275 PSI. FWTP = 67 DEGF. WELL IN TEST FOR DURATION OF LOG.
Page 1 of 1
5/13/2003
)
.1
)
24-Apr-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well 3S-23 Gyro
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
APR 2 9 2003
Alaska or; & Gas Cons. Coi'l1lniM:-
Anchontge ··...~~f
Attachment(s)
q/o3-tJY$
\f)
\~
Q ~
~
Sperry-Sun Drilling Services
> .,.-...
Western North Slope
ConocoPhillips
Kuparuk 35 Pad
35-23 Gyro
Job No. AKF00002381363, Surveyed: 16 April, 2003
Survey Report
23 April, 2003
~,
Your Ref: API 501032045300
Surface Coordinates: 5993856.07 N, 476013.11 E (70023' 39.6343" N, 150011'42.5900" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 993856.07 N, 23986.89 W (Grid)
Surface Coordinates relative to Structure: 11.65 N, 441.93 W (True)
Kelly Bushing: 55.20ft above Mean Sea Level
Elevation relative to Project V Reference: 55. 20ft
Elevation relative to Structure: -O.90ft
SpSr"'l'y-sul'l
DRILLING seRVIc:es
A Halliburton Company
Survey Ref: svy2007
Western North Slope
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
0.00 0.000 0.000 -55.20 0.00
86.00 0.900 96.000 30.80 86.00
172.83 0.550 64.000 117.62 172.82
262.00 1 .400 316.000 206.78 261.98
,~.
Sperry-Sun Drilling Services
Survey Report for Kuparuk 38 Pad - 38-23 Gyro
Your Ref: AP/501032045300
Job No. AKF00002381363, Surveyed: 16 April, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
0.00 N
0.07 S
0.04 N
1.01 N
0.00 E
0.67 E
1.72 E
1.35 E
Global Coordinates
Northings Eastings
(ft) (ft)
5993856.07 N
5993856.00 N
5993856.11 N
5993857.08 N
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
\/ertical depths ar<=; relative to RKB = 55.2' MSL. Northings and Eastings are relative to 2560' FNL, 1246' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2560' FNL, 1246' FEL and calculated along an Azimuth of 248.900° (True).
Magnetic Declination at Surface is 25.134°(07 -Apr-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 262.00ft.,
The Bottom Hole Displacement is 1.69ft., in the Direction of 53.191 ° (True).
Survey tool program for 35-23 Gyro
.-
t' -
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
0.00
262.00
261.98 Tolerable Gyro
23 April, 2003 - 15:14
Page 2 of2
476013.11 E
476013.78 E
476014.83 E
476014.47 E
Dogleg Vertical
Rate Section
(0/100ft)
1.047
0.602
1.856
ConocoPhi/lips
Comment
0.00 Tolerable Gyro
-0.60
-1.62
-1 . fì3
DrillQuest 3.03.02.005
'\
~
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
}
Re: Distribution of Survey Data for Well 3S-23
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
1 0535.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
APR 29 2003
AIuka CHi & Gas Cons. r.run-i-:-
Anchorage VV"UIßaan;Jn
ao3-0'-l5
24-Apr-03
Sperry-Sun Drilling Services
Western North Slope
ConocoPhillips
Kuparuk 35 Pad
35-23
-
Job No. AKZZ0002381363, Surveyed: 16 April, 2003
Survey Report
23 April, 2003
Your Ref: API 501032045300
Surface Coordinates: 5993856.07 N, 476013.11 E (70023' 39.6343" N, 150011'42.5900" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
_/
Surface Coordinates relative to Project H Reference: 993856.07 N, 23986.89 W (Grid)
Surface Coordinates relative to Structure: 11.65 N, 441.93 W (True)
Kelly Bushing: 55.2Oft above Mean Sea Level
Elevation relative to Project V Reference: 55. 20ft
Elevation relative to Structure: -0.90ft
5pE!!1'r'Y-SUr,
DRIL.L.ING seRvu::es
A Halliburton Company
Survey Ref: svy2016
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 3S-23
Your Ref: API 501032045300
Job No. AKZZOOO2381363, Surveyed: 16 April, 2003
ConocoPhillips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
262.00 1 .400 316.000 206.78 261.98 1.01 N 1.35 E 5993857.08 N 476014.47 E -1.63 AK-6 BP IFR-AK
389.86 4.730 308.390 334.44 389.64 5.41 N 3.87W 5993861.49 N 476009.26 E 2.618 1.66
480.10 6.490 312.600 424.24 479.44 11.17 N 10.54 W 5993867.28 N 476002.61 E 2.002 5.81
565.36 9.020 307.770 508.72 563.92 18.53 N 19.37 W 5993874.66 N 475993.80 E 3.062 11 .40
GS9.4~\ 1 )Gt10 301.220 GO 1 .1 0 656.30 28.39 N 34.00 W 5993884.56 N 475979,20 E 4.058 21.51
750.51 16.000 294.860 689.34 744.54 38.83 N 53.92 W 5993895.07 N 475959.31 E 4.068 36.33
838.68 18.510 290.030 773.54 828.74 48.74 N 78.10 W 5993905.06 N 475935.16 E 3.276 55.32 -
933.17 21.230 284.410 862.41 917.61 58.13 N 108.77 W 5993914.55 N 475904.52 E 3.515 80.55
1030.26 24.030 278.410 952.03 1007.23 65.40 N 145.37 W 5993921.94 N 475867.95 E 3.734 112.08
1118.60 27.680 276.220 1031.51 1086.71 70.26 N 183.57 W 5993926.92 N 475829.77 E 4.270 145.97
1214.57 30.870 270.880 1115.23 1170.43 73.05 N 230.37 W 5993929.86 N 475782.98 E 4.293 188.63
1311.10 33.700 264.820 1196.85 1252.05 71.01 N 281.82 W 5993927.99 N 475731.51 E 4.451 237.36
1401.37 36.810 259.870 1270.57 1325.77 63.99 N 333.41 .W 5993921.13 N 475679.91 E 4.676 288.02
1494.14 41.440 255.380 1342.53 1397.73 51.35 N 390.52 W 5993908.67 N 475622.76 E 5.848 345.85
1590.11 46 190 252.490 1411.77 1466.97 32.90 N 454.31 W 5993890.43 N 475558.90 E 5.370 412.01
1684.75 49.160 248.670 1475.50 1530.70 9.59 N 520.25 W 5993867.33 N 475492.89 E 4.330 481.92
1777 .80 54. 180 246.530 1533.19 1588.39 18.25 S 587.69 W 5993839.70 N 475425.36 E 5.688 554.86
1870.68 59.270 244.240 1584.14 1639.34 50.63 S 658.24 W 5993807.56 N 475354.71 E 5.854 632.33
1965.12 60.250 244.600 1631.70 1686.90 85.85 S 731.83 W 5993772.57 N 475281.01 E 1.089 713.67
2059.99 59.310 241.980 1679.46 1734.66 122.68 S 805.05 W 5993735.97 N 475207.67 E 2.584 795.24
2155.34 59.800 238.140 1727.79 1782.99 163.71 S 876.26 W 5993695.18 N 475136.33 E 3.510 876.45
2248.89 60.880 236.130 1774.08 1829.28 207.82 S 944.53 W 5993651.28 N 475067.91 E 2.195 956.02
2343.56 63.7 40 229.390 1818.11 1873.31 258.56 S 1011.17 W 5993600.76 N 475001.12 E 6.989 1036.45
2437.80 63.900 227.940 1859.69 1914.89 314.41 S 1074.67 W 5993545.11 N 474937.44 E 1.391 1115.80
2532.60 64.060 228.790 1901.28 1956.48 371.01 S 1138.34 W 5993488.72 N 474873.59 E 0.823 1195.58 c~
2577.16 66.870 228.200 1919.78 1974.98 397.87 S 1168.69 W 5993461.95 N 414843.15 E 6.420 1233.57
2626.07 67.950 227.810 1938.57 1993.77 428.08 S 1202.25 W 5993431.85 N 474809.49 E 2.328 1275.75
2721.88 70.410 230.210 1972.62 2027.82 486.80 S 1269.85 W 5993373.34 N 474741.71 E 3.475 1359.96
2817.07 68.450 231.390 2006.07 2061.27 543.13 S 1338.90 W 5993317.24 N 474672.47 E 2.364 1444.66
2911.45 65.160 237.040 2043.26 2098.46 593.87 S 1409.20 W 5993266.73 N 474602.01 E 6.513 1528.51
3002.79 62.640 242.260 2083.46 2138.66 635.33 S 1479.92 W 5993225.50 N 474531.15 E 5.826 1609.42
3096.73 61.980 247.630 2127.14 2182.34 670.54 S 1555.23 W 5993190.52 N 474455.73 E 5.110 1692.35
3189.05 64.570 253.000 2168.68 2223.88 698.26 S 1632.84 W 5993163.05 N 474378.04 E 5.903 1774.74
3284.61 65.490 254.210 2209.02 2264.22 722.71 S 1715.94 W 5993138.87 N 474294.86 E 1.498 1861.07
3378.35 65.460 255.050 2247.93 2303.13 745.31 S 1798.18 W 5993116.53 N 474212.55 E 0.816 1945.92
23 April, 2003 - 15:10 Page 2 0'6 DriflQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 35 Pad - 35-23
Your Ref: AP/501032045300
Job No. AKZZ0002381363, Surveyed: 16 April, 2003
ConocoPhillips
Western North Slope
Measured Sub-Sea Vertical Local Coordinat~s Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3474.59 62.500 252.510 2290.15 2345.35 769.44 S 1881.21 W 5993092.67 N 474129.44 E 3.884 2032.07
3568.11 62.870 252.950 2333.07 2388.27 794.11 5 1960.55 W 5993068.26 N 474050.02 E 0.576 2114.98
3662.00 63.680 253.750 2375.29 2430.49 818.135 2040.90 W 5993044.49 N 473969.60 E 1.150 2198.59
3755.31 61 .990 253.180 2417.89 2473.09 841.765 2120.48 W 5993021.12 N 473889.94 E 1.891 2281.34
1[\48.27 G2.290 253.510 24G1.33 2516.53 865.31 5 2199.21 W 5992997.82 N 473811.13 E 0.450 2363.27
3941.31 62.890 252.900 2504.16 2559.36 889.185 2278.29 W 5992974.21 N 473731.98 E 0.869 2445.64 .~
3985.28 62.960 253.310 2524.18 2579.38 900.56 5 2315.75 W 5992962.95 N 473694.49 E 0.845 2484.68
4059.21 62.990 252.050 2557.77 2612.97 920.165 2378.62 W 5992943.54 N 473631.55 E 1.519 2550.39
4 1 51 .88 62.510 251.090 2600.20 2655.40 946.21 5 2456.77 W 5992917.75 N 473553.31 E 1.057 2632.69
i24506 61.780 250.440 2643.74 2698.94 973.345 2534.56 W 5992890.86 N 473475.44 E 0.997 2715.03
4339.55 61.060 249.740 2688.94 2744.14 1001.605 2612.57 W 5992862.86 N 473397.33 E 1.002 2797.98
4432.95 63.030 250.640 2732.72 2787.92 1029.555 2690.19 W 5992835.15 N 473319.63 E 2.274 2880.46
4525.17 62.050 250.760 2775.25 2830.45 1056.605 2767.42 W 5992808.36 N 473242.31 E 1.069 2962.25
tlG?O.59 61.340 250.150 2820.49 2875.69 1084.705 2846.59 W 5992780.51 N 473163.05 E 0.933 3046.23
4113.17 60.520 249.810 2865.47 2920.67 1112.405 2922.62 W 5992753.05 N 473086.94 E 0.942 3127.13
4807.33 59,860 249.460 2912.28 2967.48 1140.835 2999.21 W 5992724.87 N 473010.25 E 0.772 3208.82
4902.12 62.510 248.980 2957.97 3013.17 1170.305 3076.85 W 5992695.65 N 472932.52 E 2.831 3291.87
4996.55 63.300 249.140 3000.98 3056.18 1200.345 3155.37 W 5992665.86 N 472853.91 E 0.850 3375.93
5090.79 62.910 249.010 3043.61 3098.81 1230.36 S 3233.87 W 5992636.09 N 472775.31 E 0.432 3459.98
5185.07 62.200 249.480 3087.06 3142.26 1260.01 S 3312.11 W 5992606.69 N 472696.97 E 0.873 3543.64
5278.27 61.360 248.520 3131.13 3186.33 1289.44 S 3388.78 W 5992577.51 N 472620.21 E 1.279 3625.76
5374.06 60.790 248.050 3177.46 3232.66 1320.46 S 3466.67 W 5992546.74 N 472542.22 E 0.734 3709.60
5466.13 60.230 247.740 3222.78 3277.98 1350.62 S 3540.92 W 5992516.82 N 472467.88 E 0.675 3789.73
5563.18 59.520 247.410 3271.49 3326.69 1382.64 S 3618.51 W 5992485.05 N 472390.18 E 0.788 3873.65 ----
5656.03 61.860 246.400 3316.94 3372.14 1414.405 3692.98 W 5992453.53 N 472315.61 E 2.693 3954.55
5750.84 61.950 245.510 3361.59 3416.79 1448.48 S 3769.36 W 5992419.70 N 472239.13 E 0.834 4038.08
5842.52 61,790 245.780 3404.82 3460.02 1481.82 S 3843.01 W 5992386.59 N 472165.36 E 0.313 4118.80
5936.78 63.740 248.060 3447.96 3503.16 1514.66 S 3920.11 W 5992354.00 N 472088.16 E 2.984 4202.55
6032.20 64.090 247.810 3489.91 3545.11 1546.85 S 3999.53 W 5992322.06 N 472008.64 E 0.436 4288.24
6126.19 63.960 248.140 3531.08 3586.28 1578.545 4077.86 W 5992290.63 N 471930.21 E 0.345 4372.72
6222.14 63.450 247.590 3573.59 3628.79 1610.955 4157.54 W 5992258.47 N 471850.42 E 0.739 4458.73
6316.68 62.870 246.700 3616.27 3671.47 1643.71 S 4235.27 W 5992225.96 N 471772.58 E 1.040 4543.04
6409.51 62.430 247.010 3658.92 3714.12 1676.12 S 4311.09 W 5992193.79 N 471696.66 E 0.559 4625.44
6503.53 64.090 248.090 3701.22 3756.42 1708.18 S 4388.69 W 5992161.98 N 471618.96 E 2.042 4709.38
6598.12 64.710 248.630 3742.09 3797.29 1739.63 S 4467.98 W 5992130.78 N 471539.57 E 0.833 4794.68
23 April, 2003 - 15:10 Page 3 of6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 3S-23
Your Ref: API 501032045300
Job No. AKZZ0002381363, Surveyed: 16 April, 2003
ConocoPhi/lips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates' Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6691.80 64.290 249.470 3782.42 3837.62 1769.87 S 4546.94 W 5992100.80 N 471460.51 E 0.925 4879.23
6785.80 63.780 247.710 3823.58 3878.78 1800.71 S 4625.62 W 5992070.21 N 471381.74 E 1.769 4963.74
6878.88 63.640 247.820 3864.81 3920.01 1832.29 S 4702.87 W 5992038.88 N 471304.39 E 0.184 5047.17
6971.16 63.190 247.110 3906.11 3961.31 1863.92 S 4779.09 W 5992007.50 N 471228.07 E 0.843 5129.67
7065.03 ô2.f360 2t17.5GO 3948.69 4003.89 1896.16 S 4856.28 W 5991975.50 N 471150.77 E 0.546 5213.30
7158.30 62.250 247.410 3991.67 4046.87 1927.86 S 4932.74 W 5991944.05 N 471074.21 E 0.667 5296.04 ~
7252.62 61.780 247.610 4035.93 4091.13 1959.72 S 5009.70 W 5991912.43 N 470997.15 E 0.532 5379.31
7346.15 61.510 247.050 4080.35 4135.55 1991.45 S 5085.65 W 5991880.95 N 470921.10 E 0.601 5461.59
7440.11 61.000 246.430 4125.54 4180.74 2023.98 S 5161.33 W 5991848.66 N 470845.31 E 0.793 5543.91
7534.53 61.370 249.150 4171.06 4226.26 2055.24 8 5237.91 W 5991817.65 N 470768.63 E 2.554 5626.61
7627.26 61 .140 249.060 4215.65 4270.85 2084.24 S 5313.87 W 5991788.89 N 470692.58 E 0.262 5707.91
7719.45 60.710 248.740 4260.45 4315.65 2113.24 S 5389.04 W 5991760.13 N 470617.32 E 0.556 5788.49
7817.49 60.080 248.310 4308.88 4364.08 2144.458 5468.36 W 5991729.18 N 470537.89 E 0.747 5873.72
7910.21 59.280 248.180 4355.69 4410.89 2174.118 5542.70 W 5991699.75 N 470463.46 E 0.871 5953.76
8006.81 60.340 250.120 4404.27 4459.47 2203.828 5620.73 W 5991670.29 N 470385.34 E 2.054 6037.25
8097.52 59.900 250.340 4449.46 4504.66 2230.43 8 5694.74 W 5991643.93 N 470311.24 E 0.529 6115.88
8191.24 59.380 250.740 4496.83 4552.03 2257.37 S 5770.99 W 5991617.23 N 470234.91 E 0.666 6196.71
8286.38 58.620 250.480 4545.83 4601.03 2284.44 S 5847.91 W 5991590.40 N 470157.90 E 0.832 6278.22
8379.04 57.650 250.520 4594.75 4649.95 2310.71 8 5922.10 W 5991564.37 N 470083.63 E 1.047 6356.89
8474.28 59.430 250.260 4644.45 4699.65 2337.988 5998.62 W 5991537.35 N 470007.02 E 1.883 6438.10
8570.66 58.540 251.170 4694.11 4749.31 2365.26 8 6076.58 W 5991510.32 N 469928.97 E 1.228 6520.65
8666.73 57.560 250.220 4744.95 4800.15 2392.20 S 6153.51 W 5991483.62 N 469851.95 E 1.321 6602.13
8760.41 56.890 250.180 4795.66 4850.86 2418.888 6227.62 W 5991457.18 N 469777.76 E 0.716 6680.87
8855.57 56.160 250.590 4848.15 4903.35 2445.53 S 6302.39 W 5991430.77 N 469702.90 E 0.847 6760.22 .~
8948.50 55.400 250.190 4900.41 4955.61 2471.32 S 6374.78 W 5991405.22 N 469630.44 E 0.892 6837.04
9042.60 54.480 250.080 4954.47 5009.67 2497.49 8 6447.22 W 5991379.28 N 469557.91 E 0.982 6914.04
9136.40 52.350 249.460 5010.37 5065.57 2523.53 8 6517.89 W 5991353.47 N 469487.16 E 2.332 6989.35
9231.42 51 .350 249.120 5069.06 5124.26 2549.95 S 6587.78 W 5991327.27 N 469417.18 E 1.089 7064.07
9325.02 50.380 249.420 5128.14 5183.34 2575.65 8 6655.68 W 5991301.79 N 469349.20 E 1.066 7136.67
9419.35 49.550 249.220 5188.82 5244.02 2601.168 6723.25 W 5991276.50 N 469281.55 E 0.895 7208.89
9510.84 47.750 250.050 5249.26 5304.46 2625.06 8 6787.63 W 5991252.80 N 469217.09 E 2.082 7277.56
9605.15 45.400 249.260 5314.08 5369.28 2648.87 S 6851.85 W 5991229.20 N 469152.79 E 2.565 7346.04
9697.80 41 .680 248.060 5381.23 5436.43 2672.07 S 6911.30 W 5991206.19 N 469093.27 E 4.113 7409.85
9792.79 38.050 248.430 5454.13 5509.33 2694.64 S 6967.83 W 5991183.81 N 469036.66 E 3.830 7470.73
9887.95 36.570 247.680 5529.82 5585.02 2716.18 S 7021.33 W 5991162.43 N 468983.10 E 1.627 7528.40
23 April, 2003 - 15:10 Page 4 0'6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 35-23
Your Ref: AP/501032045300
Job No. AKZZ0002381363, Surveyed: 16 April, 2003
ConocoPhíllips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9984.16 35.100 246.410 5607.82 5663.02 2738.14 S 7073.20 W 5991140.64 N 468931 .16 E 1.712 7584.69
10074.06 33.920 245.120 5681.90 5737.10 2759.04 S 7119.65 W 5991119.89 N 468884.65 E 1.544 7635.54
10167.67 32.890 245.050 5760.04 5815.24 2780.75 S 7166.39 W 5991098.33 N 468837.84 E 1.101 7686.97
10261.66 31.840 244.450 5839.43 5894.63 2802.21 S 7211.89W 5991077.02 N 468792.26 E 1.168 7737.15
10~G7.7G lO.r.90 243.890 5921.48 5976.68 2824.00 S 7256.91 W 5991055.37 N 468747.17 E 1.034 7786.99
10448.57 29.580 244.120 5999.94 6055.14 2844.04 S 7298.01 W 5991035.46 N 468706.01 E 1 .448 7832.55
10535.00 29.580 244.120 6075.10 6130.30 2862.66 S 7336.40 W 5991016.96 N 468667.56 E 0.000 7875.07 Projected Survey .~
All data is il1 FRet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical deptt1s are relative to RKB = 55.2" MSL. Northings and Eastings are relative to 2560' FNL, 1246' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2560· FNL, 1246· FEL and calculated along an Azimuth of 248.900° (True).
Magnetic Declination at Surface is 25.133°(07 -Apr-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 10535.00ft.,
The Bottom Hole Displacement is 7875.13ft., in the Direction of 248.684° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
.--
10535.00
6130.30
2862.66 S
7336.40 W Projected Survey
23 April, 2003 - 15:10
Page 50'6
DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 3S-23
Your Ref: API 501032045300
Job No. AKZZ0002381363, Surveyed: 16 April, 2003
ConocoPhillips
Western North Slope
Survey tool program for 35-23
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
262.00
0.00 262.00
261.98 10535.00
261.98 Tolerable Gyro (38-23 Gyro)
6130.30 AK-6 BP _IFR-AK (38-23)
~.
--/
23 April, 2003 - 15:10
Page 60f6
DrillQuest 3.03.02.005
'\
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
)
c:9a3-ðv 5
24-Apr-03
Re: Distribution of Survey Data for Well 3S-23 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
10,535.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
APR 2 9 2003
Alaska Off & Gas Cons. Col11l11Jaeion
Anchorage
~
~
Q
ì
('t\)
o
C(}
Sperry-Sun Drilling Services
-~
Western North Slope
ConocoPhillips
Kuparuk 35 Pad
35-23 MWD
Job No. AKMW0002381363, Surveyed: 16 April, 2003
Survey Report
23 April, 2003
~
Your Ref: API 501032045300
Surface Coordinates: 5993856.07 N, 476013.11 E (70° 23' 39.6343" N, 150011'42.5900" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 993856.07 N, 23986.89 W (Grid)
Surface Coordinates relative to Structure: 11.65 N, 441.93 W (True)
Kelly Bushing: 55. 20ft above Mean Sea Level
Elevation relative to Project V Reference: 55.20ft
Elevation relative to Structure: -D.90ft
5pe""''''''y-sufl
DRILLING seRVices
A Halliburton Company
Survey Ref: svy2017
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 3S-23 MWD
Your Ref: AP/501032045300
Job No. AKMW0002381363, Surveyed: 16 April, 2003
ConocoPhillips
Western North Slope
Measured Sub-Sea Vertical Local Coordinatès Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft)
262.00 1 .400 316.000 206.78 261.98 1.01 N 1.35 E 5993857.08 N 476014.47 E -1.63 MWD Magnetic
389.86 4.730 309.090 334.44 389.64 5.46 N 3.83W 5993861.54 N 476009.30 E 2.616 1.60
480.10 6.490 312.600 424.24 479.44 11.26 N 10.47 W 5993867.36 N 476002.68 E 1.986 5.71
565.36 9.020 308.960 508.72 563.92 18.72 N 19.21 W 5993874.86 N 475993.96 E 3.021 11.18
~ 659.43 12.640 300.750 601.10 656.30 28.63 N 33.80 W 5993884.81 N 475979.40 E 4.174 21.23
750.51 16.000 295.500 689.34 744.54 39.13 N 53.70 W 5993895.37 N 475959.54 E 3.951 36.01
838.68 18.510 289.900 773.55 828.75 49.13 N 77.83 W 5993905.45 N 475935.44 E 3.411 54.93
933.17 21.230 284.370 862.4 1 917.61 58.48 N 108.52 W 5993914.90 N 475904.78 E 3.496 80.19
1030.26 24.030 277.530 952.03 1007.23 65.44 N 145.16 W 5993921 .97 N 475868.16 E 3.954 111.87
1118.60 27.680 274.660 1031.52 1086.72 69.46 N 183.45 W 5993926.12 N 475829.88 E 4.367 146.15
1214.57 30.870 268.820 1115.24 1170.44 70.77 N 230.31 W 5993927.58 N 475783.03 E 4.458 189.39
1311.10 33.700 263.840 1196.85 1252.05 67.38 N 281.71 W 5993924.36 N 475731.62 E 4.021 238.57
1401.37 36.810 259.720 1270.57 1325.77 59.87 N 333.24 W 5993917.01 N 475680.06 E 4.335 289.34
1494.14 41 .440 255.720 1342.53 1397.73 47.33 N 390.38 W 5993904.65 N 475622.89 E 5.682 347. 1 7
1590.11 46.190 252.860 1411.76 1466.96 29.27 N 454.29 W 5993886.80 N 475558.92 E 5.361 413.29
1684.75 49.160 248.990 1475.49 1530.69 6.37 N 520.37 W 5993864.11 N 475492.77 E 4.357 483.18
1777.80 54.180 246.820 1533.19 1588.39 21.12 S 587.95 W 5993836.83 N 475425.09 E 5.696 556.14
1870.68 59.270 244.430 1584.14 1639.34 53.20 S 658.63 W 5993804.98 N 475354.31 E 5.887 633.62
1965.12 60.250 244.880 1631.70 1686.90 88.12 S 732.37 W 5993770.30 N 475280.47 E 1.116 714.99
2059.99 59.310 242.870 1679.45 1734.65 124.21 S 805.96 W 5993734.45 N 475206.75 E 2.082 796.64
2155.34 59.800 239.150 1727.78 1782.98 164.05 S 877.84 W 5993694.84 N 475134.74 E 3.402 878.04
-- 2248.89 60.880 237.610 1774.07 1829.27 206.67 S 947.06 W 5993652.44 N 475065.39 E 1.838 957.96
2343.56 63.740 230.120 1818.11 1873.31 256.10 S 1014.65 W 5993603.22 N 474997.65 E 7.627 1038.81
2437.80 63.900 228.960 1859.69 1914.89 310.98 S 1078.99 W 5993548.55 N 474933.13 E 1.118 1118.60
2532.60 64.060 230.920 1901.28 1956.48 365.81 S 1144.19 W 5993493.94 N 474867.75 E 1.866 1199. 17
2577.16 66.870 229.410 1919.78 1974.98 391.77 S 1175.31 W 5993468.07 N 474836.55 E 7.019 1237.55
2626.07 67.950 228.320 1938.57 1993.77 421.48 S 1209.32 W 5993438.4 7 N 474802.45 E 3.018 1279.97
2721.88 70.410 230.080 1972.62 2027.82 479.98 S 1277.11 W 5993380.19 N 474734.47 E 3.089 1364.27
2817.07 68.450 231.600 2006.07 2061.27 536.26 S 1346.20 W 5993324.13 N 474665.19 E 2.544 1449.00
2911.45 65.160 237.350 2043.26 2098.46 586.68 S 1416.73 W 5993273.94 N 474594.51 E 6.595 1532.94
3002.79 62.640 242.770 2083.47 2138.67 627.63 S 1487.74 W 5993233.22 N 474523.36 E 6.000 1613.94
3096.73 61.980 248.260 2127.15 2182.35 662.09 S 1563.40 W 5993199.00 N 474447.60 E 5.222 1696.93
3189.05 64.570 254.760 2168.70 2223.90 688.17 S 1641.55W 5993173.17 N 474369.36 E 6.885 1779.23
:3284.61 65.490 254.970 2209.04 2264.24 710.79 S 1725.17 W 5993150.82 N 474285.67 E 0.983 1865.39
3378.35 65.460 254.940 2247.95 2303.15 732.93 S 1807.53 W 5993128.95 N 474203.24 E 0.043 1950.19
-------_._---~_._------
23 April, 2003 - 15:13 Page 20f6 DrilfQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 3S-23 MWD
Your Ref: AP/501032045300
Job No. AKMW0002381363, Surveyed: 16 April, 2003
ConocoPhilfips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3474.59 62.500 252.680 2290.16 2345.36 757.02 8 1890.57 W 5993105.12 N 474120.12 E 3.730 2036.34
3568.11 62.870 253.270 2333.08 2388.28 781.34 8 1970.02 W 5993081.05 N 474040.59 E 0.686 2119.22
3662.00 63.680 253.750 2375.30 2430.50 805.158 2050.44 W 5993057.51 N 473960.10 E 0.976 2202.81
3755.31 61.990 252.460 2417.90 2473.10 829.26 8 2129.87 W 5993033.64 N 473880.59 E 2.189 2285.60
r--- 3848.27 62.290 252.840 2461.34 2516.54 853.778 2208.31 W 5993009.39 N 473802.07 E 0.485 2367.61
394131 62.890 252.530 2504.18 2559.38 878.35 8 2287.16 W 5992985.06 N 473723.14 E 0.709 2450.02
3985.28 62.960 253.380 2524.19 2579.39 889.838 2324.59 W 5992973.70 N 473685.67 E 1.729 2489.07
4059.21 62.990 252.050 2557.78 2612.98 909.40 8 2387.48 W 5992954.34 N 473622.73 E 1.603 2554.78
4 Î S 188 52.510 250.390 2600.22 2655.42 935.928 2465.47 W 5992928.07 N 473544.65 E 1.675 2G37.10
42~5.00 01.780 250.920 2643.75 2698.95 963.21 8 2543.20 W 5992901.03 N 473466.83 E 0.931 2719.44
4339.55 61.060 250.170 2688.96 2744.16 990.84 8 2621.44 W 5992873.64 N 473388.50 E 1.033 2802.38
4432.95 63.030 250.970 2732.74 2787.94 1018.288 2699.24 W 5992846.46 N 473310.62 E 2.241 2884.84
4525.17 62.050 251.030 2775.26 2830.46 1044.928 2776.61 W 5992820.06 N 473233.16 E 1.064 2966.62
4620.59 61.340 250.310 2820.51 2875.71 1072.738 2855.89 W 5992792.51 N 473153.80 E 0.997 3050.59
4713.17 60.520 250.030 2865.49 2920.69 1100.18 8 2932.00 W 5992765.31 N 473077.59 E 0.924 3131.48
4807.33 59.860 249.820 2912.30 2967.50 1128.228 3008.74 W 5992737.51 N 413000.76 E 0.727 3213.17
4902.12 62.510 249.370 2957.98 3013.18 1157.188 3086.57 W 5992708.80 N 472922.84 E 2.826 3296.21
4996.55 63.300 249.530 3000.99 3056.19 1186.698 3165.29 W 5992679.55 N 472844.03 E 0.850 3380.27
5090.79 62.910 249.420 3043.62 3098.82 1216.158 3244.00 W 5992650.33 N 472765.22 E 0.427 3464.31
5185.07 62.200 249.970 3087.08 3142.28 1245.198 3322.47 W 5992621.55 N 472686.66 E 0.914 3547.97
5278.27 61.360 248.970 3131.15 3186.35 1273.99 8 3399.38 W 5992593.00 N 472609.66 E 1.306 3630.09
,~ 5374.06 60.790 248.560 3177.48 3232.68 1304.358 3477.52 W 5992562.88 N 472531.42 E 0.703 3713.93
5466.13 60.230 248.200 3222.80 3278.00 1333.88 8 3552.03 W 5992533.60 N 472456.82 E 0.697 3794.07
5563.18 59.520 248.050 3271.51 3326.71 1365.158 3629.92 W 5992502.57 N 472378.82 E 0.744 3878.00
5656.03 61 .860 246.870 3316.96 3372.16 1396.198 3704.69 W 5992471.77 N 472303.96 E 2.753 3958.93
5750.84 61.950 246.000 3361.61 3416.81 1429.638 3781.35 W 5992438.58 N 472227.19 E 0.815 4042.49
5842.52 61.790 247.300 3404.84 3460.04 1461.688 3855.58 W 5992406.77 N 472152.86 E 1.263 4123.28
5936.78 63.740 248.900 3447.97 3503.17 1492.92 8 3933.34 W 5992375.77 N 472075.00 E 2.561 4207.07
6032.20 64.090 248.830 3489.93 3545.13 1523.83 8 4013.28 W 5992345.13 N 471994.97 E 0.373 4292.77
6126.19 63.960 248.800 3531.10 3586.30 1554.36 8 4092.06 W 5992314.85 N 471916.08 E 0.141 4377.27
6222.14 63.450 248.240 3573.60 3628.80 1585.86 8 4172.11 W 5992283.61 N 471835.94 E 0.746 4463.29
6316.68 62.870 247.250 3616.29 3671.49 1617.808 4250.18 W 5992251.91 N 471757.76 E 1.118 4547.62
6409.51 62.430 247.480 3658.93 3714.13 1649.54 S 4326.28 W 5992220.42 N 471681.56 E 0.523 4630.05
6503.53 64.090 248.620 3701.24 3756.44 1680.92 S 4404.16 W 5992189.30 N 471603.58 E 2.071 4714.00
6598.12 64.71 0 246.370 3742.11 3797.31 1713.57 S 4482.96 W 5992156.90 N 471524.68 E 2.243 4799.27
------~--
23 April, 2003 - 15:13 Page 3 of6 DrilfQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 35 Pad - 35-23 MWD
Your Ref: API 501032045300
Job No. AKMW0002381363, Surveyed: 16 April, 2003
ConocoPhil/ips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6691.80 64.290 246.400 3782.44 3837.64 1747.448 4560.43 W 5992123.27 N 471447.10 E 0.449 4883.7 4
6785.80 63.780 244.700 3823.60 3878.80 1782.41 8 4637.36 W 5992088.55 N 471370.06 E 1.714 4968,10
6878.88 63.640 247.480 3864.83 3920.03 1816.238 4713.64 W 5992054.97 N 471293.67 E 2.682 5051.44
6971.16 63.190 247.070 3906.13 3961.33 1848.11 8 4789.75 W 5992023.34 N 471217.45 E 0.629 5133.93
.-. 7065.03 62.860 248.010 3948.71 4003.91 1880.07 8 4867.06 W 5991991.62 N 471140.04 E 0.959 5217.57
7158.30 62.250 247.910 3991.70 4046.90 1911.138 4943.79 W 5991960.81 N 471063.21 E 0.661 s~on.:n
7252.62 61.780 247.670 4035.96 4091 .16 1942.62 8 5020.90 W 5991929.57 N 470986.00 E 0.547 S~n:U)()
7346.15 61.510 247.720 4080.38 4135.58 1973.86 8 5097.05 W 5991898.58 N 470909.75 E 0.292 546S.eg
7-!.1011 61.000 247.130 412556 4180.76 2005.48 S 5173.12W 5991867.20 N 470833.58 E 0.773 :):)-1 P, / r,
7534.53 61.370 249.750 41 71 .08 4226.28 2035.87 S 5250.05 W 5991837.05 N 470756.55 E 2.463 5c):m ~ jf j
7627.26 61 .140 249.700 4215.67 4270.87 2064.058 5326.32 W 5991809.12 N 470680.20 E 0.252 5712.26
7719.45 60.710 249.090 4260.48 4315.68 2092.40 8 5401.73W 5991781.01 N 470604.69 E 0.743 5792.82
7817.49 60.080 248.600 4308.91 4364.11 2123.168 5481.23 W 5991750.50 N 470525.10 E 0.776 5878.06
7910.21 59.280 248.340 4355.72 4410.92 2152.54 8 5555.68 W 5991721.37 N 470450.55 E 0.896 595B.1 0
8006.81 60.340 250.640 4404.30 4459.50 2181.788 5633.88 W 5991692.38 N 470372.26 E 2.332 6041.58
8097.52 59.900 250.910 4449.49 4504.69 2207.688 5708.15 W 5991666.72 N 470297.91 E 0.549 6120.19
8191.24 59.380 251.840 4496.86 4552.06 2233.51 8 5784.78 W 5991641.14 N 470221.20 E 1.020 6200.98
8286.38 58.620 251 .190 4545.86 4601.06 2259.36 8 5862.12 W 5991615.53 N 470143.77 E 0.990 6282.45
8379.04 57.650 251.460 4594.77 4649.97 2284.568 5936.67 W 5991590.57 N 470069.14 E 1.076 6361.07
8474.28 59.430 251 .1 60 4644.48 4699.68 2310.598 6013.62 W 5991564.79 N 469992.10 E 1.888 6442.24
8570.66 58.540 251.970 4694.14 4749.34 2336.72 8 6091.98 W 5991538.91 N 469913.66 E 1.171 6524.75
~. 8666.73 57.560 253.050 4744.98 4800.18 2361.22 8 6169.73 W 5991514.66 N 469835.84 E 1.397 6606.10
8760.41 56.890 251.080 4795.69 4850.89 2385.478 6244.66 W 5991490.65 N 469760.83 E 1.907 6684.7 4
8855.57 56.160 248.890 4848.19 4903.39 2412.628 6319.24 W 5991463.73 N 469686.17 E 2.067 6764.09
8948.50 55.400 250.810 4900.45 4955.65 2439.108 6391.37 W 5991437.49 N 469613.95 E 1.894 6840.92
9042.60 54.480 250.530 4954.50 5009.70 2464.59 8 6464.05 W 5991412.23 N 469541.19 E 1.008 6917.90
9136.40 52.350 249.570 5010.41 5065.61 2490.28 8 6534.85 W 5991386.77 N 469470.31 E 2.415 6993.20
9231.42 51.350 249.200 5069.10 5124.30 2516.598 6604.78 W 5991360.69 N 469400.28 E 1.096 7067.92
9325.02 50.380 248.430 5128.18 5183.38 2542.82 8 6672.48 W 5991334.67 N 469332.51 E 1.217 7140.52
9419.35 49.550 249.490 5188.86 5244.06 2568.758 6739.88 W 5991308.95 N 469265.02 E 1.231 7212.74
9510.84 47.750 250.090 5249.30 5304.50 2592.48 8 6804.33 W 5991285.43 N 469200.49 E 2.028 7281.41
9605.15 45.400 249.330 5314.12 5369.32 2616.23 8 6868.57 W 5991261.90 N 469136.18 E 2.560 7349.89
9697.80 41.680 248.190 5381.27 5436.47 2639.328 6928.06 W 5991238.99 N 469076.62 E 4.103 7413.70
9792.79 38.050 248.530 5454.17 5509.37 2661.78 S 6984.64 W 5991216.72 N 469019.96 E 3.828 7474.58
9887,95 36.570 247.900 5529.86 5585.06 2683.188 7038.20 W 5991195.49 N 468966.34 E 1.606 7532.25
---- --------------, ------~--
23 Apri!, 2003 - 15:13 Page 4 of6 DrillQuest 3.03.02.005
Western North Slope
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
9984.16 35.100 246.820 5607.85 5663.05
10074.06 33.920 245.220 5681.94 5737.14
10167.67 32.890 245.320 5760.08 5815.28
10261.66 31.840 245.030 5839.47 5894.67
...-.. 10357.76 30.890 244.290 5921.52 5976.72
10448.57 29.580 244670 5999.98 6055.18
10535.00 29.580 244.670 6075.14 6130.34
Sperry-Sun Drilling Services
Survey Report for Kuparuk 35 Pad - 35-23 MWD
Your Ref: API 501032045300
Job No. AKMW0002381363, Surveyed: 16 April, 2003
ConocoPhil/ips
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (0/100ft)
2704.85 S 7090.19 W 5991173.98 N 468914.28 E 1.663 7588.55
2725.54 S 7136.72 W 5991153.44 N 468867.68 E 1.655 7639.42
2747.10 S 7183.53 W 5991132.03 N 468820.80 E 1.102 7690.85
2768.22 S 7229.20 W 5991111.06 N 468775.07 E 1.129 7741.06
2789.63 S 7274.40 W 5991089.80 N 468729.79 E 1.067 7790.94
2809.33 S 7315.67 W 5991070.23 N 468688.47 E 1.158 7836.53
2827.58 S 7354.23 W 5991052.10 N 468649.84 E 0.000 7879.08 Projcct(~cI SI¡¡ vr~y
All data is in Fest (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relL; ¡j'J8 tc· RKB = 55.2" MSL. Northings and Eastings are relative to 2560' FNL. 1246' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2560' FNL, 1246' FEL and calculated along an Azimuth of 248.900° (True).
Magnetic Declination at Surface is 25.133°(07 -Apr-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 10535.00ft.,
The Bottom Hole Displacement is 7879.08ft., in the Direction of 248.969° (True).
Comments
----
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
10535.00
6130.34
2827.58 S
7354.23 W Projected Survey
23 April, 2003 - 15:13
~------_._------.-
Page 5 0'6
Dril/Quest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 3S-23 MWD
Your Ref: API 501032045300
Job No. AKMW0002381363, Surveyed: 16 April, 2003
ConocoPhillips
Western North Slope
Survey tool proqram for 35-23 MWD
'--"
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
262.00
0.00 262.00
261.98 10535.00
261.98 Tolerable Gyro (35-23 Gyro)
6130.34 rvlWD Magnetic (35-23 MWD)
.,'-'"
------_._-----.-~--
23 April, 2003 - 15:13
Page 60f6
DrillQuest 3.03.02.005
,>
\
Ii
I
ð03--045
1/7011
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
May 09, 2003
RE: MWD Formation Evaluation Logs 3S-23,
AK-MW-2381363
1 LDWG formatted Disc with verification listing.
~I#: 50-103-20453-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Service
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
Date:
Si~ {Jmr~
RECEIVED
MAY 13 2003
Aiatka or, & Gas Cons. Commisei.on
Andtontge
)
)
,'f
¡ ¡
LJ
l""'P rE.'
¡ 1 i r"
LI L,,::::i
(n') rE~
¡ '.. ¡ j .[ ¡ f.···'"
\.~,,:¡ U
',""1. ,"'-. \.. ((1) r"v..'1 /--\
,I IA. \"- ·lr' ð
L~::) 4.,/:-'\\ cQ).. \\ Lr-l\
/
/
l
/
/
:/
¡
FRANK H. MURKOWSKI, GOVERNOR
A.IIA.SIiA ORAND GAS
CONSERVATION COMMISSION
Randy Thomas
Kuparuk Drilling Team Leader
ConocoPhillips Alaska
P. O. Box 100360
Anchorage, Alaska 99510-0360
333 w. -,rH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Kuparuk River Unit 3S-23
ConocoPhillips Alaska
Pennit No: 203-045
Surface Location: 2560' FNL, 1246' FEL, SEC. 18, T12N, R8E, UM
Bottomhole Location: 174' FNL, 1441' FWL, SEC. 24, T12N, R7E, UM
Dear Mr. Thomas:
Enclosed is the approved application for pennit to drill the above referenced development well.
This pennit to drill does not exempt you from obtaining additional pennits or approvals required .
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required pennits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the pennit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the tenns and conditions of this pennit may
result in the revocation or suspension of the pennit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Since~~~.~_-= . ~..
~~ 3~ ~
~ Sarah Palin
Chair
BY ORDER OF THE COMMISSION
DATED this jJ day of March, 2003
cc: Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
,..,.)
ConocoPhillips
)
Post Office Box 100360
Anchorage, Alaska 99510-0360
Randy Thomas
Phone (907) 265-6830
Fax: (907) 265-1535
Email: randy.l.thomas@conocophillips.com
March 12, 2003
Alaska Oil and Gas Conservation Commission
333 West ih Avenue
Suite 100
Anchorage, Alaska 99501
(907) 279-1433
Re: Application for Permit to Drill, producer 3S-23
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore producer 1~"Jell, KRU 3S-23, a
development well.
Note that it is planned to drill the surface hole without a diverter. There have beel1 '10 wells drilled on 3S
pad with no significant indication of gas or shallow gas hydrates.
Please find attached for the review of the Commission the information required by 20 ACC 25.005 (c).
If you have any questions or require any further information, please contact Scott Lowry at 265-6869.
Sincerely,
.-.......'" -----1-
i.-'~\~
Randy Thomas
GKA Drilling Team Leader
RECEIVED
MAR 1 4 2003
Alaska Oii 8: Gas Cons. Commiaicn
Anchorage
9. Approximate spud date
March 30, 2003
14. Number of acres in property
2560
17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Maximum surface 2766 psig At total depth (TVD) 3414 psig
Setting Depth
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well. Exploratory U Stratigraphic Test
Service 0 Development Gas 0 Single Zone
5. Datum elevation (OF or KB)
RKB = 28'
1 a. Type of work: Drill L:j Redrill U
Re-entry DDeepen 0
2. Name of Operator
ConocoPhillips Alaska,
3. Address
P.O. Box 100360 Anchorage, AK 99510-0360
4. Location of well at surface
2560' FNL, 1246' FEL, Sec. 18, T12N, R8E, UM
At top of productive interval
114' FNL, 1591' FWL, Sec. 24, T12N, R7E, UM
At total depth
174' FNL, 1441' FWL, Sec. 24, T12N, R7E, UM
12. Distance to nearest property line 13. Distance to nearest well
1591' @ target 3S-26A @ 25' @ 749'
16. To be completed for deviated wells
Kickoff depth: 250 MD
18. Casing program
size
6. Property Designation
ADL 25544 ALK 2639
7. Unit or property Name
Kuparuk River Unit
8. Well number
3S-23
feet
Maximum hole angle
62°
)
k~ it R'
U
o
Development Oil ld
Multiple Zone 0
10. Field and Pool
Kuparuk River Field
Kuparuk River Oil Pool
11. Type Bond (see 20 MC 25.0251)
Statewide
Number
#59-52-180
Amount
$200,000
15. Proposed depth (MD and TVD)
10552' MD / 6166' TVD
Hole Casing Weight
42" 30"x16" 62.5#
12.25" 9.625" 40#
8.5" 7" 26#
Top Bottom Quantity of Cement
MD TVD MD TVD (include stage data)
28' 28' 108' 108' 1 st stage: 17 bbls ArcticCrete, 2nd
stage: 46 sx ArcticCrete
28' 28' 3940' 2609' 600 sx AS Lite & 330 sx LiteCrete
28' 28' 10552' 6166' 250 sx Class G
20. Attachments Filing fee [2] Property Plat 0 BOP Sketch 0 Diverter Sketch 0 Drilling program [2]
Drilling fluid program [2] Time vs depth plot Qefraction analysis 0 Seabed report 020 AAC 25.050 requirements [2]
21. I hereby certify that the foregoing is true and correct to the best of my knowledge Questions? Call Scott Lowry 265-6869
.~ ";-, ~ -S/(~/<:J ~
Signed \ ~ Title: Kuparuk Drilling Team Leader Date
R. Thomas PrAnarArl hv 8hamn AII.cmn-nrakp.
Commission Use Only
Permit Number I / C-- API number 2. / I r3 I Approval date « J '(7 h'() ./1. ¡See cover letter
2ó '3 -'0-,..::;) 50- /D ~ ,.. 2-D'-f:>. - CD '?/ /!'íJf() Q for other requirements
Conditions of approval Samples required 0 Yes œ No Mud log required U Yes ~ No
Hydrogen sulfide measures 0 Yes l8I No Directional survey required ro Yes 0 No
Required working pressure for BOPE D2M; 0 3M; ~ 5M; 0 10M; 0 0
Other: 3 saa ~~-, ßa ç> ~ ~\ \"""-, '"' \. '(V\..\.) \'-\..
Original Signed By
s..dh PalM
Specifications
Grade Coupling
Length
Weld
BTC
BTCM
B
L-80
L-80
80'
3912'
10524'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total Depth:
Plugs (measured)
measured
true vertical
feet
feet
Effective Depth:
feet
feet
Junk (measured)
measured
true vertical
Casing
Conductor
Surface
Production
Length
Size Cemented
Perforation depth:
measured
true vertical
by order of
Approved by
Form 10-401 Rev. 12/1/85·
Commissioner
O I~ ~,""'iI\ ~ r3:1 A
i ¡ Ul¡ i1J/i..
the commission
Measured depth
True Vertical depth
RECEIVED
MAR 1 4 2003
AJaska 0tI & Gas Cons. Commiseion
Anchorage
Date
;j/J; þ~
Submit in triplicate
)
)lication for Permit to Drill, We1l3S-23
. Revision No.O
Saved: 11-Mar-03
Permit It - Kuparuk Well 35-23
Application for Permit to Drill Document
MoximizE
Well "101'-11;
Table of Contents
1. Well Name.1 ........ .... ......... .......... ..... ...... ..... .....1 I. ....... ..... ..... ...... ..... ........ .... ..... ........... 2
Requirements of 20 AAC 25.005 (f)........ .......... ...................................................................................... 2
2. Location Sum mary ....... ..... ....... ..... ........ ... ........ ..... ............ .... ....... ..... ......... ... ........... 2
Requirements of 20 AAC 25.005(c)(2) .. ........... ...................................... ........... .......................... ........... 2
Requirements of 20 AAC 25. 050(b)......... .......... .......................................... ................................ ...........2
3. Blowout Prevention Equipment Information .........................................................3
Requirements of 20 AAC 25.005(c)(3) .... .................................................... ........................................... 3
4. Dri II i ng Hazards Information .. ...... ....... ..... ....... ....... ........ ........ ..... .................. ...... .... 3
Requirements of 20 AAC 25.005 (c)( 4) .................. ........................... ...... ........... .................................... 3
5. Procedure for Conducting Formation Integrity Tests ...........................................3
Requirements of 20 AAC 25.005 (c)(5) ...................................... ........... ............. .............. ...................... 3
6. Casi ng and Cementi ng Program. ............. ....... ..... ... ..... ....... ... ..... ...... ..... .... .... ... ...... 4
Requirements of 20 AAC 25.005(c)(6) ................................. ................ ............. ............. .................. ......4
7. Diverter System Information. ...... ...... ....... ....... ..... ... ..... ....... ........ ..... ...... .... ... .......... 4
Requirements of 20 AAC 25.005(c)(7) ................................. ................ .............. ............ ......... ........ ....... 4
8. Drill i ng FI u id Program .... ........ ........... .... ..... ..... ..... ........ ........ ....... ... ........ .... .... ..... .... 4
Requirements of 20 AAC 25.005(c)(B) ................. ............ ......... ............ ............ .............. ................. ......4
9. Abnormally Pressured Formation Information ......................................................5
Requirements of 20 AAC 25.005 (c)(9) ......... ............................. ................................................ ..... .......5
10. Seismic Analysis........ ......... ................ ....... ............. ...... ... ... ................ ... ... ......... ...... 5
Requirements of 20 AAC 25.005 (c)(10) ...... ........................................................ ............... ...................5
11. Seabed Condition Analysis .....................................................................................6
Requirements of 20 AAC 25.005 (c)(11) .......... .............................................................................. ........ 6
12. Evidence of Bond i ng .. ......... ...... .... ...... .... ............ ... ....... .... ... ...... ... ........... .......... ..... 6
Requirements of 20 AAC 25.005 (c)(12) .................................................... ............................................ 6
13. Proposed Dri II i ng Program ..... ............ ..... ................. ... ....... .......................... .......... 6
· 1'~ G"· .,r t:. j I' L
¡ ... 'I " (ì I I
II J '\~i"~
3$-23 PERMIT IT. DOC
Page 1 of 7
Printed: 11-Mar-03
)
)lication for Permit to Drill, We1l3S-23
. Revision No.O
Saved: 11-Mar-03
Requirements of 20 AAC 25.005 (c)(13) .......... ............ ................ ...... ............... ............ ...... ........ ........... 6
14. Discussion of Mud and Cuttings Disposal and Annular Disposal....................... 6
Requirements of 20 AAC 25.005 (c)(14) .......... ........... ................. ................. ................ ...... ................... 6
15. Attac h ments ............................................................................................................. 7
Attachment 1 Directional Plan............... ................. ..... .................................................. ..... ...... ............. 7
Attachment 2 Drilling Hazards..................................................... ................................ ........6
Attachment 3 Well Schematic.................... .................... ................................. .....................6
1. Well Name
Requirements of 20 AAC 25.005 (f)
Each well must be Idt'mtified by a unique name des~qnated by the operator and;;7 unique API number assigned by the commÌ!:;:..c;ion
under 20 AAC 25.040(b). For a we/I with multiple well branche:,~ each branch mllst similat1y be Identified by a unique name and API
number by adding a suffix to the name designated for the well by the operator and to the number as::,1,qned to the well by the
commission.
The well for which this application is submitted will be designated as 35-23.
2. Location Summary
Requirements of 20 AAC 25.005(c)(2)
An applic"ation tor a Permit to Onll must be accompanied by eaäl of 'the following items, except for an item already on flÏe with the
commission and Identified in the application:
(2) a plat identifylÌ1g the property and the propetty's owners and showing
(A)the LìJordinates of the proposed location of the well at the surface/ at the top of each oþjective formation/ and ðt total depth
referenced to governmental section lines.
(B) the coordinates of the proposed location of the well at the sur'fr:1ce/ referenced to the state plane coordinate!::;y..'-;.tem for thl:t;
state as maintained by tfle National Geodetic Survey in the National Oceanic and Atmospheric Administration,'
(C) the proposed depth of tile well at the top of eadJ objective (ormation and at total depth,:
Location at Surface
NGS Coordinates
Northings: 5,993,856
I 2560' FNL, 1246' FEL, Sec 18, T12N, R8E, UM
RKB Elevation
Eastings: 476,013 Pad Elevation
56.1' AMSL
28.0' AMSL
Location at Top of
Productive Interval
(Kuparuk "C" Sand)
NGS Coordinates
Northings: 5,991,050
114' FNL, 1591' FWL, Sec 24, T12N, R7E, UM
Eastings: 468,755
Measured Depth, RKB:
Total Vertical Depth, RKB:
Total Vertical Depth, 55:
10228'
5886'
5830'
Location at Total Depth 1174' FNL, 1441' FWL,
NGS Coordinates
Northings: 5,990,990 Eastings: 468,604
Sec 24, T12N, R7E, UM
Measured Depth, RKB:
Total Vertical Depth, RKB:
Total Vertical Depth, 55:
10552'
6166'
6110'
and
(0) other information required by 20 AAC 25.050(b)/
Requirements of 20 AAC 25.050(b)
If a well is to be intentionally deviated, the application for a Permit to Onll (Form 10-401) must
(1) include a plat; drawn to a sUItable scale/ showing the path of the proposed wellbore/ including all ðdjacent wellbores within 200
feet of any portion of the proposed well,'
Please see Attachment 1: Directional Plan
C i~A~"r~1
!~ Î."' ¡; . . '\
Ill~ ;: 'I ' I ..··1. ,.-
'J' ¡j}, ' ií· ""'"
3S-23 PERMIT IT.DOC
Page 2 of 7
Printed: 11-Mar-03
)
)¡Cation for Permit to Drill, Well 3S-23
Revision No.O
Saved: 11-Mar-03
and
(2) for all wells wlt.t7in 200 feet of the proposed we/lbore
(A) list the names of the operators of those well~~ to the extent that thO$e names are known or discoverable in public records,
and show tflat each named operator has been furnished a copy of the application by certified malÏ,' or
(8) state that the applicant is the only affec.ted owner.
The Applicant is the only affected owner.
3. Blowout Prevention Equipment Information
Requirements of 20 AAC 25.005(c)(3)
An applkätion for a Perrnit to Dlill must be ac'Complmied by each of the following Items¡ except for an Item already on file with the
commission and identified in the applìc<.¡tion:
(3) a dÙ:Jgram and description of'the blowout prevention equipment (80PE) as required by 20 MC 1.').035, 20 AAC 25.036, or 20
AAC 25.037, as applicable,'
Please reference BOP schematics on file for Nabors 7E5.
4. Drilling Hazards Information
Requirements of 20 AAC 25.005 (c)(4)
An application for a PermIt tv Drill must be accompanied by each of the tollowing Item5~ except tor an item already on file with the
cvmmis:<;ion and identitìed in the application:
(4) information on df/fling hazardS¡, including
(A) the maximum downhole pressure that may be encountered, cntelia used to determine it; and maxlÍ7Jum potential sll/face
pressure based on a methane gradient;
A pressure build-up test performed on Palm lA (35-26) in 4/01 indicated a reservoir pressure in the
Kuparuk C sand of 3597 psi at 5830' tvd, 0.62 psi/ft or 11.9 ppg EMW (equivalent mud weight). Due to
pressure depletion, the predicted reservoir pressure for 35-23 is predicted at 3395 psi at 5886' tvd, 0.58
psi/ft or 11.1 ppg EMW.
The maximum potential surface pressure (MP5P) while drilling 35-23 is calculated using above maximum
reservoir pressure, a gas gradient of 0.11 psi/ft, and the Kuparuk C sand target at 5886' tvd:
MP5P =(5886 ft)*(0.58 - 0.11 psi/ft)
= 2766 psi
(B) data on potential gas zones;
The well bore is not expected to penetrate any gas zones.
and
(C) data concerning potential calJ!:Jì2S of hole problems such as abnormally geo-pressured strata, lo~t circulation zones, and zones
that have a propensity tor differential sticking;
Please see Attachment 2 - Drilling Hazards Summary
5. Procedure for Conducting Formation Integrity Tests
Requirements of 20 AAC 25.005 (c)(5)
An application for a Permit to Drill must be aCl..ìJmpanied by each of the following items, except for an item already on file with the
commission and Identified in the application:
(5) a description of t/7e procedure for conducting formation integrity tests, as required under 20 AAC 25.030{f),'
A procedure is on file with the commission for performing LOT's. For 35-23 the procedure will be
followed with one exception. The surface casing shoe will be pressured until leak-off occurs and the 16.0
ppg EMW maximum will not be observed. (see step 6 in the procedure)
-1IlA, l~: ~ t~ I
If , ï \;>1 S ( i i b
3$-23 PERMIT IT. DOC
Page 3 of 7
Printed: 11-Mar-03
,\,~
¡
)lication for Permit to Drill, Well 3S-23
Revision No.O
Saved: 11-Mar-03
6. Casing and Cementing Program
Requirements of 20 AAC 25.005(0)(6)
An application for a Perrl7lt to Drill must be accompanied by each of the following Item5~ except for an item already on file with the
commission and identified in the application:
(6) a t.."'Omplete proposed casing and cementing program as required by 20 MC 25.03~ and a description of any slotted liner; pre-
petforated liner;, or screen to be 1Ì7stalleC¿'
Casin~ and Cementing Proqram
Hole Top Btm
CsglTbg Size Weight Length MDITVD MDITVD
00 (in) (in) (Iblft) Grade Connection (ft) (ft) (ft) Cement Program
30 X 16 42 62.5 H-40 Welded 80 28 / 28 108 / 108 9 cy High Early
Insulated
9-5/8 12-1/4 40 L-80 BTC 3912' 28'/28' 3940'/2609' Lead: 600 sx 10.7 ppg
AS Lite
Tail: 330 sx 12.0 ppg
'LiteCRETE'.
(Yield=2.40 cuft/sk)
Planned TOC=Surface
7 8-1/2 26 L-80 BTC-Mod 10524' 28'/28' 10552'/6166' 250 sx 15.8 ppg 'G' w/
add.
Planned TOC= 9428'
3-1/2 9.3 L-80 EUE 8rd 10100' 28' / 28' 10128'/5799' SAB- 3 packer set at
Mod 10128' MD.
If 7" casing must be top-set above the Kuparuk C sand, 6 1/8" hole would be drilled to total depth and a
3 V2" 9.3 ppf L -80 SLHT production liner will be cemented across the productive interval.
7. Diverter System Information
Requirements of 20 AAC 25.005(0)(7)
An application for a Permit to Dlill must be accompanied by each of the fallowing item!.>~ except far an item already on file wIth the
commission and Identified in the appliœtion:
(7) a dia.qram and description of the diverter system as required by 20 MC 25.03.~ unless this requirement i<; waived by the
commis!:'ion under 20 MC 25'.03.5(h)(2);
Please reference diverter schematic on file for Nabors 7ES. ConcoPhillips plans not to use a diverter on
well 35-23.
8. Drilling Fluid Program
Requirements of 20 AAC 25.005(0)(8)
An application for a Permit to Drill must be accompanied by each of the fallowing item~ exæpt tor an item already on file wIth the
commission and Identified in the application:
(8) a drillti7g flUId program/ including a diagram and description of the drilling fluid system/ as required by 20 MC 25.033;
Drilling will be done using mud systems having the following properties:
JR !f'"'. ~ .'! : .~ !
/ 1;' ) (' ~
¡ " ~ "\,' , i, . ~i
, i J \"'J ~. ~ :~ (/.~~, "_
35-23 PERMIT IT. DOC
Page 4 of 7
Printed: 11-Mar-03
) )lication for Permit to Drill, Well 3S-23
Revision No.O
Saved: 11-Mar-03
Surface Hole mud properties
Spud to Base of Permafrost Base of Permafrost to Total Depth
Initial Value Final Value Initial Value Final Value
Density (ppg) 8.6 9.0* 9.0* 9.4*
Funnel Viscosity 120-130 120-130 120-130 120-130
(seconds)
Yield Point 35-45 27 -40 25-35 20-30
(cP)
Plastic Viscostiy 8-15 11-22 15-30 15-30
(lb1100 sf)
10 second Gel 1 0-30 10-25 1 0-25 10-25
Strength (lb1100 sf)
10 minute Gel 25-55 25-55 20-40 15-35
Strength (lb1100 sf)
pH 8-9 8-9 8-9 8-9
API Filtrate(cc) 12-15 7-8 7-8 7-8
Solids (%) 6-9 6-12 6-12 6-12
* 9.8 if hydrates are encountered
Production Hole mud properties
initial C40 Top Morraine Top HRZ Kuparuk
Density (ppg) 8.8 10.2 10.6 10.8 11.6
Funnel Viscosity 40-55 42-55 42-58 42-58 42-58
(seconds)
Yield Point 11-15 20-25 20-25 20-25 20-25
(cP)
Plastic Viscostiy 6-12 8-15 8-16 8-18 15-25
(lb1100 sf)
10 second Gel 2-5 3-6 3-6 4-7 4-8
Strength (lb1100 sf)
10 minute Gel 4-10 7-10 7-112 7-12 8-16
Strength (lb1100 sf)
pH 9-9.5 9-9.5 9-9.5 9-9.5 9-9.5
API Filtrate(cc) <6 <6 <6 <4 <4
Solids (%) 6-11 9-14 1 0-15 1 0-15 15-1 9
Diagram of Nabors 7ES Mud System on file.
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 MC 25.033.
9. Abnormally Pressured Formation Information
Requirements of 20 AAC 25.005 (c)(9)
An application for a Permit to Dnl/ must be accompanied by each of the following item~ except for an item already on file wIth the
commission and Identified in the application:
(9) for an exploratory or stratigraphic test well a tabulation setting out the depths of predicted abnormally geo-pressured strata as
required by 20 AAC 25.033(f)/
N/ A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
Requirements of 20 AAC 25.005 (c)(10)
An application for a Permit to Dn/I must be accompanied by each of the following item~ except tor an item already on file wIth the
commission and Identified in the application:
(10) tor an exploratory or stratigraphic test well a seismic retraction or reflection analysis as required by 20 AAC 25.061(a);
N/ A - Application is not for an exploratory or stratigraphic test well.
( ',.: ,~ i~ }~, '\,.. ! /1.. L
, '-"1 . i "£ l"-~
3S-23 PERMIT IT. DOC
Page 5 of 7
Printed: 11-Mar-03
)
\,
,Èlication for Permit to Drill, Well 3S-23
Revision No.O
Saved: 11-Mar-03
11. Seabed Condition Analysis
Requirements of 20 AAC 25.005 (c)(11)
An application for a Permit to Drill must be accompanied by each of tIle following item5~ except for an item already on file with the
commission and identified in tile application:
(11) lor a well drilled from an offshore platform/ mobile bottom-founded structure/ jack-up rig/ or floating drilling ve!'''sel, an analysis
of seabed condItions as required by 20 MC 25.061(b);
N/A - Application is not for an offshore well.
12. Evidence of Bonding
Requirements of 20 AAC 25.005 (c)(12)
An applÍLìation fvr a Permit tv Dnll ml1.':>t be accompanied by eac:h of the following Items~ exæpt for an item already on file with the
commi5':.<:;ion and identified in the application:
(12) evidenæ sflOwing that the requirements of 20 MC 25.025 {Boncfing}have been met/
Evidence of bonding for Phillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
Requirements of 20 AAC 25.005 (c)(13)
An application for a Permit to On/I must be accompanied by each of the following item~ except for an item already on file wIth the
commission and Identified li7 the application:
The proposed drilling program is listed below. Please refer as well to Attachment 3, Well Schematic.
1. MIRU Nabors 7ES.
2. N/U riser (no diverter).
3. Drill 12-1/4" hole to 9-5/8" surface casing point according to directional plan. No LWD logging
equipment required.
4. Run and cement 9-5/8" 40#, L -80 BTC casing string to surface. Employ lightweight permafrost
cement lead slurry and LiteCRETE tail slurry. Pump adequate excess to ensure cement reaches
the surface. If cement does not circulate to surface, perform top job. Install and test BOPE to
5000 psi. Test casing to 2500 psi.
5. Drill out cement and 20' of new hole. Perform LOT.
6. Drill 8-1/2" hole to total depth according to directional plan. Run LWD logging equipment with
GR, resistivity, and density-neutron. Run 7" 26# L-80 BTCM casing to surface and cement.
Note: If significant hydrocarbon zones are present above the Kuparuk C sand, sufficient cement
will be pumped for isolation in accordance with 20 AAC 25.030( d)(3)(C).
7. Run 3-1/2" 9.3#, L-80 8rd EUE 8rd-Mod completion assembly w/ SAB-3 permanent packer and
PBR. Set packer 100' above top planned perforation, shear out of PBR, P/U tubing hanger, and
land tubing. Pressure test tubing to 3500 psi. Pressure test 3 V2" x 7" annulus to 3500 psi.
Burst shear valve for freeze protect.
8. Set TWC and ND BOPE. Install and pressure test production tree.
9. Freeze protect. Secure well. Rig down and move out.
10. Handover well to Operations Personnel.
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
Requirements of 20 AAC 25.005 (c)(14)
An application for a Permit to On/I mustc be accompanied by each of the following item~ except for an item already on file wIth the
commission and Identified in the application:
(14) a general descnþtJon of how the operator plans to dispose of dn/ling mud and cuttings and a statement of whether the
operator intends to request authorization under 20 MC 25.080 for an annular disposal operation lìl the wel/./
Waste fluids generated during the drilling process will be disposed of down a permitted annulus on 3S
pad or hauled to a KRU Class II disposal well. All cuttings will be disposed of either down a permitted
annulus on 3S pad or hauled to the Prudhoe Bay Field for temporary storage and eventual processing for
injection down an approved disposal well.
J J & ",11".\ ? ". J n
, I 1 Ili i (y /1 L.
35-23 PERMIT IT. DOC
Page 6 of 7
Printed: 11-Mar-03
)
)lication for Permit to Drill, Well 3S-23
Revision No.O
Saved: 11-Mar-03
At the end of drilling operations, an application may be submitted to permit 35-23 for annular pumping of
fluids occurring as a result of future drilling operations on 35 pad.
15. Attachments
Attachment 1 Directional Plan
Attachment 2 Drilling Hazards Summary
Attachment 3 Well Schematic.
· '~~ :""\ r t1 1/ it
,~ :{ ¡ {;; jjJ'/i..
3$-23 PERMIT IT. DOC
Page 7 of 7
Printed: 11-Mar-03
·....:J
Sperry-Sun Drilling Services _
ConocoPhillips Ala -
Western Nor,
Ku
--
C)
::J:J
----
~)
Revised: 4 March, 2003
~~....;;.-~
. ~--~ --;.~~..
Proposal Report
~--
4 March, 2003
Surface Coordinates: 5993856.07 N, 476013.11 E (70023' 39.6343" N, 1500 11' 42.5900" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
--
Kelly Bushing: 55.80ft above Mean Sea Level
s:sru=-"""y..c:a ,..,
DRIL-LING SERVices
A HaUiburton Company
Proposal Ref: pro 1993
·~Ph·· _II-
Conoco .. .·1. IpS
ConocoPhillips Alaska, Inc.
North Slope, Alaska
Palm (3S Pad)
35-23 (wp03)
&plldi '----V-Sur,
DRILLING' SERVices
A Halliburton Company
o 1200 2400
I / SHL (2560' FNL; 124.6' FEL. SEC. 18- T/2N - RBE)
0-- - - - ~ Begin Dir-@2'ffi10Õft (in 12-14' Hole): 250.ooft MD~ 25õ.õÕttñto- - - - - - - - - - - - - - --: - - - - - - - - -- 0
/ Increase in Dir Rate @ 4.00/100ft : 550.ooft MD, 549.45ft TVD @
~~ ~y
3600
I
4800
I
6000
I
7200
I
8400
I
Reference is True North
1200 -
Ç)Ç)
...rÞ<$>· 7' Csg PI.
10552.00' MD
6166.26' TVD
End Dir, Start Sail @ 62.3° : 1997.55ft MD, 1705.91ft TVD
Current Well Properties
3S-23 Plan
Well:
<:::)
::tJ
Horizontal Coordinates:
Ref. Global Coordinates: 5993856.07 N, 476013.11 E
Ref. Structure: 11.65 N, 441.93 W
Ref. Geographical Coordinates :70023' 39.6343" N, 1500 11' 42.5900" W
2560' FNL & 1246' FEL, SEC. 18- T12N - R8E
~4'~
9-5/S' Csg PI.
3940,00' MD
2609.02' TVD
RKB Elevatión :
North Reference:
Units:
55.8Oft above Mean Sea Level
True North
Feet (US SUlvey)
C'<~
-;J; J ::J 2400-
---...."... ~
<
)<~
APPROVED Plan
r--
Co
..0
LO
II
(Q
~
ES
É. 3600-
Q)
o
(ij
u
:e
Q)
>
4800 -
3S-23 (Geo-Target)
Circle, Radius: l50.00ft
~9/5885'80 TVD, 2829.35 S, 7249.07 W
~~
;t::
o
o
C\I
II
.£::
U
.£; 6000 -
TARGET: 10228.16ft MD, 5885.80ft TVD (114' FNL & 1591' FWL, See 24-T12N-R7E)
(¡j
ëij
u
C/)
Total Depth: 10552.ooft MD, 6166.26ft TVD (174' FNL & 1441' FWL, See 24-T12N-R7E)
o
I
1200
I
2400
I
3600
I
4800
I
6000
I
7200
I
8400
Scale: 1 inch = 1200ft
DrillOuest 3.03.02.002
9600
I
"~
- 1200
::J
CJ)
~
- 2400 Co
..0
LO
II
(Q
~
fS
..c
õ..
Q)
o
- 3600 (ij
u
:¡::;
ã>
>
~'
- 4800
õ
o
C\I
II
.£::
U
- 6000 .£;
(¡j
ëij
u
C/)
I
9600
SHL (25ÔO' FNL & 124ô' FEL, SEC, 18- T12N - R8E)
Begin Dir @ 2.00/100ft (in 12-114' Hole): 250.00ft MD, 250,OOft TVD \
Increase in Dir Rate @ 4.00/100ft: 550.00ft MD, 549.45ft TVD ~ \\ I
0------------------------- ~I
End Dir, Start Sail @ 62.~97.5šft"MD,17õš.91ft ìV~ ----: - "
~
't>
''t;, I
,
I
I
I
I
I
,
I
,
I
I
I
,
I
I
'~
ConocOPhi II ips
-8000
I
Scale: 1 inch = 1000fl
-7000
I
-6000
I
<::)
:::c:J
~
~)
~ ~"
~~~::- Q¡
~-'";;.. ZI
:.t~_:. '.
L,j ~ -= .AI
-1000 -
(/)
0>
c:
£
o
z
~
't>
''t;,
r--
Begin Drop @ 2,oo/100ft :
8613,46ft MD, 4781.87ft TVD
-2000 -
T Csg
10552,00' MD
6166.26' TVD
-3000 -
ConocoPhillips Alaska, Inc.
North Slope, Alaska
Palm (35 Pad)
38-23 (wp03)
SpE!l'r-tY-SUI1
DAILLING SERVices
A HaUiburton Company
-5000
I
-3000
I
o
I
I
-4000
I
-2000
I
-1000
I
~~
-~o
9-518" Csg PI.
9·5/8" Csg Pt ... Drill out 8-112" Hole : ~~:~: ~D
3940.00ft MD, 2609.02ft TVD ------------.,
y"
.'t;,
~
't>
''t;,
~'t;,
''t;,
~Q':>ì
,:>S-'2-':> I..: "
0't;,
''t;,
~
't;,
''t;,
\,
'q,
~
't;,
'q,
'%!
't>
''t;,
- -1000
N
@
(/)
0>
c:
:E
t:
o
Z
Reference is True North
- -2000
'(';J
't>
'q,
Current Well Properties
~r
Well:
3S-23 Plan
Horizontal Coordinates:
Ref. Global Coordinates: 5993856.07 N, 476013.11 E
Ref. Structure: 11.65 N, 441.93 W
Ref. Geographical Coordinates: 70° 23' 39.6343" N, 1500 ii' 42.5900" W
2560' FNL & 1246' FEL, SEC. 18- T12N - R8E
- -3000
TARGET: 10228.16ft MD, 5885.80ft TVD
(114' FNL & 1591' FWL, See 24-T12N-R7E)
55.80ft above Mean Sea Level
True North
Feet (US Survey)
õ
o
o
11
.>;
o
.£
3S-23 (Ceo-Target)
Circle, Radius: 150.00jt
5885.80 TVD, 2829.35 S, 7249.07 W
¡¡¡
(ij
/:A
-4000 -
I
Total Depth: 10552.00ft MD, 6166.26ft TVD
(174' FNL & 1441' FWL, See 24-T12N-R7E)
I
-8000
I
-7000
I
-6000
Scale: 1 inch = 1000fl
DrillOuesl 3,03.02,002
RKB Elevation:
North Reference:
Units:
;t::
o
o
o
11
.>;
o
.£
APPROVED Plan
- -4000
¡¡¡
(ij
o
(/)
I
-5000
I
-2000
I
-4000
I
-3000
I
-1 000
o
Eastings
ConocoPhillips Alaska, Inc. 35-23 (wp03)
MD Inc Azim. SSTVD TVD N/S E/W Y X DLS V.S. Comment
(ft) (Deg) (Deg) (ft) (ft) (ft) (ft) (ft) (ft) e /1 OOft) (ft) ---.
0,00 0.00 0.00 -55,80 0.00 0.00 N 0.00 E 5993856.07 N 476013.11 E 0.00 0.00 SHL
250.00 0.00 0.00 194.20 250.00 0.00 N 0.00 E 5993856.07 N 476013.11 E 0.00 0.00 Begin Dir @ 2.0°/1 o Oft (in 12-1/4" Hole)
550.00 6.00 290.00 493.65 549.45 5.37 N 14.75 W 5993861.49 N 475998.38 E 2.00 11.83 Increase in Dir Rate @ 4.00/100ft
<::) 1706.95 50.72 249.42 1490.00 1545.80 139.28 S 518.43 W 5993718.46 N 475494.24 E 4.00 533.81 B. Permafrost
:::0 1997.55 62.29 248.20 1650.11 1705.91 226.89 S 743.92 W 5993631.57 N 475268.46 E 4.00 775.72 End Dir
--- 2653.33 62.29 248.20 1955.00 2010.80 442.54 8 1282.98 W 5993417.65 N 474728.72 E 0.00 1356.27 T. West Sak
~") 3610.45 62.29 248.20 2400.00 2455.80 757.30 8 2069.74 W 5993105.42 N 473940.95 E 0.00 2203.60 B. West Sak
~".." 3940.00 62.29 248.20 2553.22 2609.02 865.67 S 2340.63 W 5992997.91 N 473669.72 E 0.00 2495.34 9-5/8" Csg pt ... Drill out 8-1/2" Hole
~:~'::;3 4040.62 62.29 248.20 2600.00 2655.80 898.76 S 2423.34 W 5992965.09 N 473586.90 E 0.00 2584.41 C-80 (K-10)
-.-
"-'.... 7090.52 62.29 248.20 4018.00 4073.80 1901.748 4930.36 W 5991970.16 N 471076.67 E 0.00 5284.42 C-40 (K-3)
",,1.~
r-- 8613.46 62.29 248.20 4726.07 4781.87 2402.57 8 6182.22 W 5991473.35 N 469823.21 E 0.00 6632.64 Begin Drop @ 2.00/100ft
9395.37 46.66 248.20 5179.00 5234.80 2638.21 8 6771.24 W 5991239.60 N 469233.44 E 2.00 7267.00 Top Morraine
9804.41 38.48 248.20 5480.00 5535.80 2740.88 S 7027.91 W 5991137.75 N 468976.44 E 2.00 7543.42 Top HRZ
10027.65 34.01 248.20 5660.00 5715.80 2789.89 S 7150.42 W 5991089.14 N 468853.78 E 2.00 7675.36 Base H RZ
10146.65 31.63 248.20 5760.00 5815.80 2813.84 S 7210.30 W 5991065.38 N 468793.82 E 2.00 7739.85 K-1
10228.16 30.00 248.20 5830.00 5885.80 2829.35 8 7249.07 W 5991050.00 N 468755.00 E 2.00 7781.60 TARGET
10251.25 30.00 248.20 5850.00 5905.80 2833.63 S 7259.79 W 5991045.75 N 468744.27 E 0.00 7793.15 Miluveach "-"'
1 0552.00 30.00 248.20 6110.46 6166.26 2889.48 8 7399.41 W 5990990.35 N 468604.47 E 0.00 7943.51 Total Depth
<:::>
=0
---
ø
----
--.,~-" -.
'C"'""'_
-
.~
r--
Western North Slope
Measured
Depth
(ft)
100.00
200.00
250.00
300.00
400.00
500.00
550.00
600.00
700.00
800.00
900.00
1000.00
1100.00
1200.00
1300.00
1400.00
1500.0Q ~
1600.0q:{
1700.0d?;
Incl.
0.00
0.000
0.000
0.000
0.000
Azim.
0.000
0.000
0.000
0.000
1.000 290.000
3.000
5.000
6.000
7.564
11,117
14.897
18,766
22.680
26.618
30.571
34.534
38.594ß:
".. 42 .4Z~~:
}~i:~"k
1706.95:.-} 50.715
1800.00 ';; . 54.421
1900.00 58.406
1997.55 62.294
62.294
62.294
62.294
62.294
62.294
62.294
4 March, 2003 - 10:38
2000.00
2100.00
2200.00
2300.00
2400.00
2500.00
290.000
290.000
290.000
279.356
267.810
261.928
258.407
256.060
254.375
253.098
Sub-Sea
Depth
(ft)
-55.80
44.20
144.20
194.20
244.20
344.13
443.88
493.65
543.30
641.97
Vertical
Depth
(ft)
100.00
200.00
250.00
300.00
399.93
499.68
549.45
739.39
~~~:~ð;,f~11~h
rnJ{~1 q~~~~~ïf 0 . 8
_·~·~·110T26 0<-116306
:~~~~.-.j; ~" -.:: ~:i{j~R}i)-// .
25~Q'88~~þ ft91 .54
;r,~6:;Ñ~RtJt;' ~~~i:~~
~~$.97i~c 1419.27
2~9.456 1485.59
-.-.,
'249.422
248.992
248.572
248.195
248.195
248.195
248.195
248.195
248.195
248.195
1490.00
1546.55
1601.86
1650.10
1651.25
1697.74
1744.23
1790.73
1837.22
1883.71
1247.34
1327.69
1403.72
1475.07
1541.39
1545.80
1602.35
1657.66
1705.90
1707.05
1753.54
1800.03
1846.53
1893.02
1939.51
0.00
Sperry-Sun Drilling Services
Proposal Report for 35-23 Plan - 35-23 (wp03)
Revised: 4 March, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
0.00 N
0.00 N
0.00 N
0.00 N
0.15 N
47.83 S
66.55 S
87.79 S
111.448
137.39 S
139.27 S
165.51 8
195.66 8
226.89 S
227.69 S
260.58 S
293.468
326.35 8
359.24 S
392.12 S
0.00 E
20.45 W
36.58 W
58.95 W
87.45 W
121.93 W
162.23 W
208.16 W
259.48 W
315.96 W
377.30 W
443.22 W
513.40W
518.43 W
587.49 W
665.13 W
743.92 W
745.94 W
828.14 W
910.34 W
992.54 W
1074.74 W
1156.94 W
Page 2 ot8
Global Coordinates
Northings Eastings
(ft) (ft "
5993856.07 N
5993862.93 N
5993863.69 N
5993861.58 N
5993856.64 N
5993848.87 N
5993838.31 N
5993825.03 N
5993809.07 N
5993790.53 N
5993769.49 N
5993746.05 N
5993720.33 N
5993718.46 N
5993692.45 N
5993662.55 N
5993631.57 N
5993630.77 N
5993598.15 N
5993565.53 N
5993532.91 N
5993500.29 N
5993467.66 N
476012.70 E
476009.43 E
476002.88 E
475998.38 E
475992.68 E
475976.55 E
475954.17 E
475925.66 E
475891.15 E
475850.82 E
475804.85 E
475753.48 E
475696.94 E
475635.53 E
475569.53 E
475499.27 E
475494.24 E
475425.09 E
475347.36 E
475268.46 E
475266.44 E
475184.14 E
475101.83 E
475019.53 E
474937.22 E
474854.92 E
2.000
2.000
2.000
2.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
0.000
0.000
0.000
0.000
0.000
0.000
ConocoPhiJ/ips
Comment
0.00 8HL (2560' FNL & 1246' FEL, SEC. 1
T12N - R8E)
0.00
0.00
0.00 Begin Dir @ 2.00/100ft (in 12-1/4'"
Hole): 250.00ft MD, 250.00ft TV[,_....._/
0.33
2.96
8.21
11.83
16.63
31.43
53.08
81 .48
116.49
157.94
205.62
259.30
318.73
383.61
453.63
528.44
533.81
607.68
690.97
775.72
777.90
866.42
954.95
1 043.48
1132.01
1220.54
Increase in Dir Rate @ 4.0°/1 OOft :
550.00ft MD, 549.45ft TVD
B. Permafrost
'-~
End Dir, Start 8ail @ 62.3° : 1997.55ft
MD, 1705.91ft TVD
DrillQuest 3.03.02.002
Western North Slope
a
::t,
~......:o:...~_~
G"''''''o-
~<J
~--'-~-':!I
~2~
r--
Measured
Depth
(ft)
2600.00
2653.33
2700.00
2800.00
2900.00
3000.00
3100.00
3200.00
3300.00
3400.00
3500.00
3600.00
3610.45
3700.00
3800.00
3900.00
3940.00
Sub-Sea Vertical
Depth Depth
(ft) (ft)
1930.21 1986.01
1955.00 2010.80
1976.70 2032.50
2023.19 2078.99
2069.69 2125.49
2116.18 2171.98
2162.67 2218.47
2209.17 2264.97
2255.66 2311.46
2302.15 2357.95
Incl. Azim.
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
62.294 248.195
Sperry-Sun Drilling Services
Proposal Report for 35-23 Plan - 35-23 (wp03)
Revised: 4 March, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
425.01 S
442.54 S
457.89 S
490.78 S
523.66 S
1239.14 W
1282.98 W
1321.34 W
1403.54 W
1485.74 W
ConocoPhillips
Global Coordinates
Northings Eastings
(ft) ( ..
Comment
5993435.04 N
5993417.65 N
599340 .42 N
59 N
5 N
1309.06
1356.27
1397.59
1486.12
1574.65
T. West Sak
ß-;;~"__ ~:¡~â~~?¿;_ ,_.__~
J9_?:n~W:'ol::~33Ø4.55 N
~z:~"1t>pp.1~lfJ-~c~271.93 N
;..~. 1.~.3~W -"'~,:';;5993239.31 N
-;-:!/}a'4.54 W 5993206.69 N
896.74 W 5993174.07 N
2348.65
2395.14
2400.00
2441.63
2488.13" _
·t_§~~~~~t;.:~~~~~~~:6~
':'-'-'F"
-.
...
4000.00 62.2~4·;.. 248.195 ; . 2581.11
:~6~:~@:t,' ii'.:~:~~~> ~~: ~~~'."c'. ~~~~:~~
. .
ë2'.a$4 ::;?48.195 2674.10
62.294 .. 248.195 2720.59
62.294 248.195 2767.09
62.294 248.195 2813.58
62.294 248.195 2860.07
62.294 248.195 2906.57
62.294 248.195 2953.06
62.294 248.195 2999.55
62.294 248.195 3046.05
62.294 248.195 3092.54
4 March, 2003 - 10:38
4200. O(j,~,:.:
4300.00.
4400.00 ';' ..
4500.00
4600.00
4700.00
4800.00
4900.00
5000.00
5100.00
2636.91
2655.80
2683.41
2729.90
2776.39
2822.89
2869.38
2915.87
2962.37
3008.86
3055.35
3101.85
3148.34
852.52 S
865.67 S
885.41 S
898.76 S
918.29 S
951.18 S
984.06 S
1016.95S
1049.83 S
1082.72 S
1115.61 S
1148.49 S
1181.38 S
1214.26 S
1247.15S
1978.95 W
2061.15 W
2069.74 W
2143.35 W
2225.55 W
2307.75 W
2340.63 W
~'
5993141.45 N
5993108.82 N
5993105.41 N
5993076.20 N
5993043.58 N
474443.39 E 0.000
474361.08 E 0.000
474278.78 E 0.000
474196.47 E 0.000
474114.17 E 0.000
474031.86 E 0.000
473949.56 E 0.000
473940.95 E 0.000
473867.25 E 0.000
473784.95 E 0.000
473702.64 E 0.000
473669.72 E 0.000
2459.92
2495.34 9-5/8" Csg Pt ... Drill out 8-1/2" Hole:
3940.00ft MD, 2609.02ft TVD
9 5/8in Casing
1663.17
1751.70
1840.23
1928.76
2017.29
2105.81
2194.34
2203.59 B. West Sak
2282.87
2371.40
5993010.96 N
5992997.91 N
2389.95 W 5992978.34 N 473620.33 E 0.000 2548.45
2423.34 W 5992965.09 N 473586.90 E 0.000 2584.41
2472.15 W 5992945.72 N 473538.03 E 0.000 2636.98
2554.35 W 5992913.09 N 473455.72 E 0.000 2725.51
2636.55 W 5992880.47 N 473373.42 E 0.000 2814.04
2718.75 W 5992847.85 N 473291.11 E 0.000 2902.56
2800.95 W 5992815.23 N 473208.81 E 0.000 2991.09
2883.15 W 5992782.61 N 473126.50 E 0.000 3079.62
2965.35 W 5992749.99 N 473044.20 E 0.000 3168.15
3047.55 W 5992717.36 N 472961.89 E 0.000 3256.68
3129.75 W 5992684.74 N 472879.59 E 0.000 3345.20
3211 .95 W 5992652.12 N 472797.28 E 0.000 3433.73
3294.15 W 5992619.50 N 472714.97 E 0.000 3522.26
Page 3 0'8
C-80 (K-10)
---.
DrillQuest 3.03.02.002
Western North Slope
Measured
Depth Incl.
(ft)
5200.00 62.294
5300.00 62.294
5400.00 62.294
5500.00 62.294
5600.00 62.294
5700.00 62.294
5800.00 62.294
5900.00 62.294
6000.00 62.294
6100.00 62.294
a 6200.00 62.294
:=a 6300.00 62.294
-.......... 6400.00 62.294
~"') 6500.00 62.294
-.,-...."" 6600.00 62.294
~-",.~
~.:~: 6700.00 62.294
""'r 6800.00 62.294
L_~
r-- 6900.00 62.294
7000.00 62.294
7090.51 62.294:;c~
Sub-Sea Vertical
Azim. Depth Depth
(ft) (ft)
248.195 3139.04 3194.84
248.195 3185.53 3241.33
248.195 3232.02 3287.82
248.195 3278.52 3334.32
248.195 3325.01 3380.81
248.195 3371.50 3427.30
248.195 3418.00 3473.80
248.195 3464.49 3520.29
248.195 3510.98 3566.78
248.195 3557.48 3613.28
248.195 3603.97
248.195 3650.46
248.195 3696.96
248.195 3743.45
248.195 3789.9i
:""
Sperry-Sun Drilling Services
Proposal Report for 35-23 Plan - 35-23 (wp03)
Revised: 4 March, 2003
ConocoPhillips
Local Coordinates Global Coordinates
Northings Eastings Northings Eastings Comment
(ft) (ft) (ft) (
1280.03 S 3376.35 W 5992586.88 N 3610.79
1312.92 S 3458.55 W 5992554.25 N 3699.31
1345.81 S 3540.75 W 59925 .63 N 3787.84
1378.69 S 3622.95 W 59 1 N 3876.37
1411.58 S 3705.15 W 5 N 3964.90
-:4J1i1!J1f$1c
".~Z8.~,.. Vif: _.:~(~2423.77 N 472221.14 E 0.000 4053.43
'~"'..~c?c~-~.~W ':;tu~391.15 N 472138.84 E 0.000 4141.95
c~. ~~~ .75''$ ·~-'á5992358.52 N 472056.53 E 0.000 4230.48
..4033.95 W 5992325.90 N 471974.23 E 0.000 4319.01
116.15 W 5992293.28 N 471891.92 E 0.000 4407.54
4198.35 W 5992260.66 N 471809.62 E 0.000 4496.06
4280.55 W 5992228.04 N 471727.31 E 0.000 4584.59
4362.75 W 5992195.42 N 471645.00 E 0.000 4673.12
4444.95 W 5992162.79 N 471562.70 E 0.000 4761.65
4527.16 W 5992130.17 N 471480.39 E 0.000 4850.18
1773.32 S 4609.36 W 5992097.55 N 471398.09 E 0.000 4938.70
1806.20 S 4691.56 W 5992064.93 N 471315.78 E 0.000 5027.23
1839.09 S 4773.76 W 5992032.31 N 471233.48 E 0.000 5115.76
1871.98 S 4855.96 W 5991999.69 N 471151.17 E 0.000 5204.29
1901.74 S 4930.36 W 5991970.16 N 471076.67 E 0.000 5284.42 C-40 (K-3)
1904.86 S 4938.16 W 5991967.06 N 471068.87 E 0.000 5292.82
1937.75 S 5020.36 W 5991934.44 N 470986.56 E 0.000 5381.34
1970.63 S 5102.56 W 5991901.82 N 470904.26 E 0.000 5469.87
2003.52 S 5184.76 W 5991869.20 N 470821.95 E 0.000 5558.40
2036.40 S 5266.96 W 5991836.58 N 470739.64 E 0.000 5646.93
2069.29 S 5349.16 W 5991803.95 N 470657.34 E 0.000 5735.45
2102.18 S 5431.36 W 5991771.33 N 470575.03 E 0.000 5823.98
2135.06 S 5513.56 W 5991738.71 N 470492.73 E 0.000 5912.51
2167.95 S 5595.76 W 5991706.09 N 470410.42 E 0.000 6001.04
2200.83 S 5677.96 W 5991673.47 N 470328.12 E 0.000 6089.57
2233.72 S 5760.16 W 5991640.85 N 470245.81 E 0.000 6178.09
2266.60 S 5842.36 W 5991608.22 N 470163.51 E 0.000 6266.62
2299.49 S 5924.56 W 5991575.60 N 470081.20 E 0.000 6355.15
2332.38 S 6006.76 W 5991542.98 N 469998.90 E 0.000 6443.68
2365.26 S 6088.96 W 5991510.36 N 469916.59 E 0.000 6532.20
Page4of8 DrHK)uest~0~OZ002
-...-'
¡~ii!t~&~tlª:?'""?1~~~.~~
/Z48}r~5 ;);' 4018.00 4073.80
;:,0.. ·_;-.-Or-:-
~~~~:~gt_. ~i~~1;j~,(.y~~~: ~ ~~X;;
7300.00;~/:; 62:29'4 <:::.g48.195
7400.00 ::' 62.294 '248.195
7500.00J 62.294 248.195
7600.00 62.294 248.195
7700.00 62.294 248.195
7800.00 62.294 248.195
7900.00 62.294 248.195
8000.00 62.294 248.195
8100.00 62.294 248.195
8200.00 62.294 248.195
8300.00 62.294 248.195
8400.00 62.294 248.195
8500.00 62.294 248.195
4 March, 2003 - 10:38
4022.41 4078.21
4068.90 4124.70
4115.40 4171.20
4161.89 4217.69
4208.38 4264.18
4254.88 4310.68
4301.37 4357.17
4347.86 4403.66
4394.36 4450.16
4440.85 4496.65
4487.34 4543.14
4533.84 4589.64
4580.33 4636.13
4626.82 4682.62
4673.32 4729.12
~---'
Western North Slope
a
=t:J
~-~- ~L_"
Ç)
~~~-d
~~ '~!
1"~.-;_~
~
r--
Measured
Depth
(ft)
Incl.
8600.00 62.294
8613.46 62.294
8700,00
8800.00
8900.00
9000.00
9100,00
9200.00
9300.00
9395.37
9400.00
9500,00
9600.00
9700,00
9800.00
60.563
58.563
56.563
54.563
52.563
50.563
48.563
46.656
46.563
44.563
42.563
40.563
38.563
Sub-Sea
Azim. Depth
(ft)
248.195 4719.81
248.195 4726.07
248.195 4767.46
248.196 4818.11
248.196 4871.75
248.196 4928.29
248.196 4987.68
248.196 5049.85
248.197 5114.70
248.197 5179.00
248.197 5182.18
248.197 5252.19
248.197 5324.64
248.198 5399.46,,>
248.198 547q~gg'c'~
Vertical
Depth
(ft)
4775.61
4781.87
4823.26
4873.91
4927.55
Sperry-Sun Drilling Services
Proposal Report for 35-23 Plan - 35-23 (wp03)
Revised: 4 March, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
Global Coordinates
Northings Eastings
(ft) L '
2398.15 S
2402.57 8
2430.808
2462.83 8
2494.17 S
4984.09
5043.48
5105.65
5170.50
5234.80
~;~~~:~f~~r~'~~;i~~'~66~.à S
þ~8d,:ì¡4 -~~"2691.57 S
54&5.26 "2716.21 8
:5532,~5 2739.868
38.475 248.1 ~ª_. ':<>Š48d'.óh
36.563 24ß,.t~8':~~;0" . t)!)55.82
34.563 24é;:199\i,\ 5(137.16
34.0tQ"".~NNt~,~;,/Y 5660.00
_ ~2.56~\ ~6. HJ~.~::_· 5720.48
10146.6!t/ -:i:iS630::·{. 248.200" 5760.00
1 0200.00t·;3lr5Q3'è:~~48.200 5805.68
10228.16'.. 30.000 248.200 5830.00
9804.4 1
9900.00
10000.00
10027.64
10100.0Q'
~-·5535.80
5611.62
5692.96
5715.80
5776.28
5815.80
5861 .48
5885.80
2740.888
2762.50 S
2784.10 S
2789.898
2804.63 S
2813.84 S
2824.07 8
2829.35 S
6171.16W
6182.22 W
5991477.74 N
5991473.35 N
ConocoPhillips
Comment
6620.73
6632.64 Begin Drop @ 2.0o/100ft: 8613.46ft
MD, 4781.87ft TVD
6708.64
6794.85
6879.24
----'
6961.70
7042.14
7120.46
7196.56
7267.00 Top Morraine
7270.36
7341.75
7410.66
7476.99
7540.68
7543.42
7601 .63
7659.79
7675.36
7715.07
7739.85
7767.40
7781.60
10251.25 30.000 248.200 5850.00 5905.80 2833.63 S 7259.79 W 5991045.75 N 468744.27 E 0.000 7793.15
10300.00 30.000 248.200 5892.22 5948.02 2842.69 8 7282.42 W 5991036.77 N 468721.60 E 0.000 7817.52
10400.00 30.000 248.200 5978.82 6034.62 2861.25 S 7328.85 W 5991018.35 N 468675.12 E 0.000 7867.51
10500.00 30.000 248.200 6065.42 6121.22 2879.82 S 7375.27 W 5990999.93 N 468628.64 E 0.000 7917.51
10552.00 30.000 248.200 6110.46 6166.26 2889.48 S 7399.41 W 5990990.35 N 468604.47 E 0.000 7943.51
4 March, 2003 - 10:38
2.000
2.000
2.000
352.10 N 469517.28 E 2.000
991322.45 N 469442.49 E 2.000
5991293.60 N 469369.68 E 2.000
5991265.55 N 469298.92 E 2.000
5991239.60 N 469233.44 E 2.000
6774.36 W 5991238.36 N 469230.32 E 2.000
6840.65 W 5991212.06 N 469163.94 E 2.000
6904.63 W 5991186.67 N 469099.88 E 2.000
6966.23 W 5991162.23 N 469038.20 E 2.000
7025.36 W 5991138.76 N 468978.99 E 2.000
7027.91 W 5991137.75 N 468976.44 E 2.000
7081.96 W 5991116.30 N 468922.32 E 2.000
7135.96 W 5991094.88 N 468868.25 E 2.000
7150.42 W 5991089.14 N 468853.78 E 2.000
7187.29 W 5991074.51 N 468816.86 E 2.000
7210.30 W 5991065.38 N 468793.82 E 2.000
7235.89 W 5991055.23 N 468768.20 E 2.000
7249.07 W 5991050.00 N 468755.00 E 2.000
PageS of8
Top H RZ
Base HRZ
K-1
TARGET: 10228.16ft MD, 5885.80ft~
TVD (114' FNL & 1591' FWL,
Sec 24- T12N-R7E)
Kuparuk
38-23 (Geo-Target), 150.00 Radius.,
Current Target
Miluveach
Total Depth: 10552.00ft MD, 6166.26'
TVD (174' FNL & 1441' FWL,
8ec 24-T12N-R7E)
7in Casing
DrillQuest 3.03.02.002
<::>
::r:J
~"=-~-~ ~
ç ,>,
~. '"'
~"'-~... - -- -.,
~~
~.----
Western North Slope
Sperry-Sun Drilling Services
Proposal Report for 3S-23 Plan - 3S-23 (wp03)
Revised: 4 March, 2003
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 55.8' MSL. Northings and Eastings are relative to 2560' FNL, 1246' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2560' FNL, 1246' FEL and calculated along an Azimuth of 248.900° (True).
Magnetic Declination at Surface is 25.168°(04-Mar-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 10552.0011.,
The Bottom Hole Displacement is 7943.5711., in the Direction of 248.669° (True).
The Along Hole Displacement is 7952.73ft, the Planned Tortuosity is 1.318°/1
Comments
Measured
Depth
(ft)
0.00
250.00
550.00
1997.55
3~4p·P9
Station Coord
TVD Northing~tßfi
(ft) (ft) &M . -.~
0.00"
250.00"
.~49,45.
:-;,/;,70~~.p-,1 - ..r':-~
. 2609.02
< '¡'. O. ÓÒ:.É:
O::::W.OO I\{
,-.-,", -';~?5.37 N
226.89 S
865..67 S
~: ._"';', -, 2""'.-.' ~
86~~·.4tt".:. 47È301·87
1022&:;1B '.. 5.885.80
105.52.00 6166.26
4 March, 2003 - 10:38
2402.5.7 S
2829.35. S
2889,48 S
0.00 E
0.00 E
14.75. W
743.93 W
2340.63 W
6182.23 W
7249.07 W
7399,41 W
_ú!:;1}~~'?,.
Comment
SHL (25.60' FNL & 1246' FEL, SEC. 18- T12N - R8E)
Begin Dir @ 2.00/100ft (in 12-1/4" Hole): 250.00ft MD, 250.00ftTVD
Increase in Dir Rate @ 4.00/100ft: 550.00ft MD, 549,45ft TVD
End Dir, Start Sail @ 62.3°: 1997.55ft MD, 1705.91ft TVD
9-5/8" Csg Pt... Drill out 8-1/2" Hole: 3940.00ft MD, 2609.02ft TVD
Begin Drop @ 2.00/100ft: 8613,46ft MD, 4781.87ftTVD
TARGET: 10228.16ft MD, 5885.80ft TVD (114' FNL & 1591' FWL, Sec 24-T12N-R7E)
Total Depth: 10552.00ft MD, 6166.26ft TVD (174' FNL & 1441' FWL, Sec 24-T12N-R7E)
Page 6 of8
ConocoPhillips
.~.
---"
Dril/Quest 3.03.02.002
:t--.:J
:::t:J
~~~~.~
r=<=-T
;h~ J
~":""---:;-·Þ_'.-:a
~
:.~~~
r--
Western North Slope
Formation Tops
Formation Plane
(Below Well Origin)
Sub-Sea Dip Up-Dip
(ft) Angle Dlrn.
Profile
Measured Vertical
Depth Depth
(ft) (ft)
Sperry-Sun Drilling Services
Proposal Report for 35-23 Plan - 35-23 (wp03)
Revised: 4 March, 2003
Penetration Point
Sub-Sea
Depth Northings
(ft) (ft)
1490.00 0,000 359.816 1706.95 1545.80 . Permafrost
1955.00 0.000 359.816 2653.33 2010.80 T. West Sak
2400.00 0.000 359.816 3610.45 2455.80 B. West Sak
2600.00 0.000 359.816 4040.62 2655.80 C-80 (K-10)
4018.00 0.000 359.816 7090.51 4073.80 C-40 (K-3)
5179.00 0.000 359.816 9395.37 5234.80 517 6771 .24 W Top Morraine
5480.00 0.000 359.816 9804.41 5535.80 ~~~j3 7027.91 W Top HRZ
5660.00 0.000 359.816 10027.64 5715.8-0 c .~s:§OO .m,.:é 7150.42 W Base H RZ
5760.00 0.000 359.816 10146.65 ~~ 15jØ <c'-,,:57~00 7210.30 W K-1
5830.00 0.000 359.816 10228.16 '~.OO 7249.07 W Kuparuk
5850.00 0.000 359.816 5850.00 2833.63 S 7259.79 W Miluveach
Casinø details
'-.':'"
\?'{r Om(.. .... J;:
Meá8ur~:: . Vørttc-al
Di~IWj'\<'>; <. D~"R.th
(fil' (ft)
Depth
(ft)
<Surface> <Surface>
<Surface> <Surface>
3940.00
10552.00
4 March, 2003 - 10:38
To
Vertical
Depth
(ft)
2609.02
6166.26
Casing Detail
9 5/8in Casing
7in Casing
Page 70t8
ConocoPhillips
«-
~
Dril/Quest 3.03.02.002
a
~-....."O._
- .
~~
~-~-~
"'---"""<--
~'-~~-
~~j:.J
r--
Sperry-Sun Drilling Services
Proposal Report for 35-23 Plan - 35-23 (wp03)
Revised: 4 March, 2003
Western North Slope
Targets associated with this welloath
Target Name
Targe
TVD
fM!~~.
38-23 (Geo-Target)
- ~-" ---- - ~
'-'0- ~.81F"-
Mean Sea Level/Global Co~at~ - ::3~~583(l.OO ."~
Geograph!,9-~:~~~l-9r~tés-~~;.~/~ --
h::':rã:~ Râ!11u~~~~~!r50.00ft
4 March, 2003 - 10:38
Page 8 0'8
'29.35 S 7249.07 W
5991050.00 N 468755.00 E
70023' 11.7709" N 150015' 14.8385" W
ConocoPhillips
Target Target
Shape Type
Circle
Current Target
'----'
--'
DrillQuest 3.03.02.002
¡::::
.8
.....
CI:j
;...
CI:j
0..
d
~.~
:.:~:'-~
~'c.).
.MÁ Ö
~...=~
~A:;)
---·s
~
f-b\
I
36.O-=~ .. ~~-I-'-
i
I
34.O-=~--·-+~
- I
32.0
¡
30. o--=~-~__J__n.
r---I
,.....
'+-<
'---'
24.0-=·;-
22.0--=-
20.0-=- -.--'
14.0--:::"; n..
12.0--:::-~
8.0-=~:
2.~
. "
~--.-------:---------
r '_ :
_ ----.-:._ ~__"J___~___.___----!.-
I ¡
-¡ ¡
f
I
i
I
l
_:__.~...L_n
í
i-
f
I .
. . ~ ..
.....,.--
-.
¡ ¡
,
i
- :
,
i-
.-
'. ..
. ·
I .
: ,
,
-.
0_ .._._ ... '_.'
._--~
.
,
! - .-
3S-14 (3S-14)
3S-22 (3S-22 (Rig Surveys))
Plan: 3S-17 (Plan: 3S-17)
Plan: 3S-20 (Plan: 3S-20)
Plan: 3S-23/Plan: 3S-23
.
-\ --
i --
.'
-,. -- -
.-
.-
- _, un ': .. '..'
. . . :
¡..: .,.,.,. ..' ,
- ,; . .. .'
._ _,. _.,.i' '--' .__._...1. .Li'::
. .--. ..---...
.. .." :¡-i .:-r'·'.c- . c__ __, '. . . ::
.. __ -n_,:.._!______ r " ' , :
;-. . .~.- .. - . ,
- . .--- '--".' . . .,
. . -.----f-1 ,----:-Ti-··-- -"-r
_.:_..._,_ ._."'_,. __, i-c-r± ' : ,. . I
:.:::.>:..---~--~ .~ '.,:
O 0 . .. i·, '. - ..-. -. . , ,¡' '"
. 11111111111111 1111111111"1111111 III1 1III III 1"11 1I1I 11I1 ¡Iii
-250 -150 -50 0
1-'; > ~
. .'
-- - _.~__f-~> _-'_ _ _:__~__~_~__+_ __
'. . -.. . -·.····.-=-'-.f
. 1····-: . .' .
_ n _._. _ _ . , _ '_.' .... _ :_. .
..: .::. ¡.. "
__ - ¡.-._. _'.n_: .
! .'.:. - ; _". _i.:.-....,-,-
_~_n-!--__-+-._ ~: , ¡ . , .
i - - - -,_. .:~.T:_:n- ,-~ ..:-. :... H .'.:-
: ;
. '. -to. . ,- -- . -.-' ---,-
.... ..-'
. f··,.. . -- - ·-c·:· .,' . -'-'-;
, " -.--....,.,-. ::'
-- '.'-->,
- -,'. ,-'-'
~ . ; . - .,.. c
·
:
· ,"- . .
¡
--,
. --. - - -
. ..'- -.
...
-- ---en' -- "-'
· ,
.',. /./'
: '.-e-
--- -, '
· -
,'-~
---
..
..C ._. .n. .-:
...' " ---
~
. +.; .'- .
~..__u
: L. - _ _';--:.. ____'~'
. '. .-. '. -i'-'
_. . - ~..'-
-. -".'-'" ...,.'...-...-- "
.. ---. -- -'---.
. -.- - ---- .-
__ ..,. ..____ L _
. :
. -
. .
. . .
· T ,'.-'.--
-.-.+ ,~----
..' .
......._... .·i·_'·-_~_>:···· .
__. _'.. n_ ~.. __...:_,_.._;_._!-_
.... .-¡.. --
h-- .,. .¡---,.->-
..--:- . ,
',' ..C_. _'._
. -
·
.,
'n _
50
150
250
3S-15 (3S-15)
3S-22 (Plan: 3S-22)
Plan:3S-17(Plan:3S-1~
Plan: 3S-21 (Plan: 3S-21)
. .
. " " ¡,
· . ,,,:
. .
.' ,
..-:+'-':' '.
. '-"''--A
I
., ':
: '. . '/ ;
, : :. .
_ c..·...
,
I
;;. c_ , !',' , '.'
,
" : '..,--- . ,
;'/ . . ," .'
/c ..
/ . . , ,
if ' ,
/. .. '.
C......_", .
7: -·-·,-V . i
/. 'X· -, , .
':'-~'/ /~ -
;/ ,
',,/ . . '.
·
·
·
¡ . . ·
--
· . · . ;
·
·
.. . . , , ,
)tr ..,-.-- · .
.
. . . . ; ,
.
'-H--
_ __ ".n ,__,__'.. ..,..
....
,
. · . , ·
--.
..J.__... -,- -0--- ---,. ·
. , · · p
, , ~
.- .;. .-- --
n·_ ·~i. · ,
. , , :
'\
\ '
.
. . .
. ,-:
'-', .. ..-, .
.i..
'II ., '. . : ,. . ;
. ,"-- .' ,
.. -- .
· " ; ',"-
: '. .. . . -- i':
.' '"
, ··H-: '.'
· ,-- .'.
Li,_ _.___ . .'
, ' . .......---
" ..' -- ,
.'--. -.,- ,;
. .'.
': '.' "--+---
.. .
, ,
. " - "",-, - ....- ·H..,'- ,
. , '; -- - ---;.---
, · . ' , . ; ... ..+H..:-· ..,........
'. " , , . , ....'. ~;. ': : :
': .'-~---
;
; ';" :. '
. , .·c---}---
· ;, . '>..~-
. ; '. ·-~.'c;. ..L._ __.. ." . .
,
, .
, '. ,/ .
, " I ¡ , . , , ; ;
, I,
. .
. .
, . ' , . ,./¡: .,'.' -'---'- -'-- : ¡ ; . .
:
.
,........,,,..
u__ ' --. : '
": ,
.
'. . . ..
; . ;
; , "
, .
" ,
i ."
_ ~ .'_ i . . i . ._'.u
i '
, . .c...
, -; --'--.-, ""
m.__...
..'-
·
.Lc_._;T
, . ' . , .
·
.
:: ,
; \
J
, . /
.,'
,
,'- ý
; y. '.
4
-' .
.
.--
-.- --
. ---.
. 'i ..
~-; - -:-.::.:::
': -
-:< -. '----.--
,-='
;
, , -- \.
\
: i . . '\
..........
, --
" "
i .
·
· . : ,
, .
· . ,
·
, . . .
· ..
·
· .
, ,
· .
--.. .
. '.
ç
"'1''''; ,
. .....
. .....
, ,.
¡
. ;
,
:
.
_~ ____n
--
. - --."--
, ,
· .
· i , .
, . . '
., ,
·
· i ,.
, .'
· '
, .
,
..-- ,
·
· .
· .. .
: ' :,.,
· ;;
· ; .
; .
, ; .. . ; '; .
, "
, ;'
" .'
; :':'
, ;
· ,...
. .
;-,,~, .
----i--
__.0
.-.--,.-
.
;: .
, .,
- ,.-
·
:
. --
--.~---
'.c.
...,. -:
.
- :"....:
.....:...
"i-' ...:----
. ¡ : ¡ .
;
'.' ,-
n··__·
.".....'./
: :. __: ; <,c...
, ; , .
· ,
; " , , .
: . :,. ¡ -;" . ". , . ; , . ; :
III III 1II1I III1 1111 1II1 "" 1111 " 1II11I IIII Iii IIII 1111 Ilil 11II
Measured Depth [it]
550
3S-16 (3S-16)
3S-26 (3S-26)
Plan: 3S-19 (Plan 3S-19F)
Plan:3S-21 (Plan:3S-21F)
+--- ..-:.
; : - -- - .~-~~~-;--.~- --
, : ,
. .
. ;. --'-+
. .: . ': . ; .
, ,', ,
, ,
· '
. .
· .
, .
,
-'----
,
;
; ,.,: .,.' ,._-,--C.
, ,. ;
,
.' . .
· . ': . .; --,----
. '" . ,
. ,
.
i
.
~..
·
. .;
· , .
· ";:
-- ,. , ¡ ;; .'
· . u____" '; u:____.;__'
, . , .
".' ,; ;
.------
,
·
, .",-¡-~
900
3S-18 (3S-18)
3S-26 (3S-26A)
Plan: 3S-19 (plan: 3S-19)
, ,
,.¢~~~~ÿ:
,Field:' ,"
'. .Røfen~ce'.Site:
',Rèrer~~ce'WeU,:; ...,
Re(el'~nce W~Upath:
)
)
SPERRY_SUN DES
Anticollision Report
PhilHpSAI?skalnc.~
I<UparUk River Unit'
KuparÙk 3Spad
Rlal'l;3S:-23
. 'Plan: .3S~23'
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 28.10 to 10552.00 ft
Maximum Radius: 1252.39 ft
Survey Program for Definitive Wellpath
Date: 5/15/2002 Validated: No
Planned From To Survey
ft ft
28.10 800.00
800.00 10552.00
Casing Points
3940.00 2608.92
10552.00 6165.66
Planned: 3S-23 (wp03) V8
Planned: 3S-23 (wp03) V8
'Dian:ièt(~r
10,
9.625
7.000
Hol~'$ize
, in"
12.250
8.500
Dåte: 3/4/20031:'ime;:tQ~45:04 .Page: ,
"C~.()r4inat~(~E)Rete~en~:· ,.' , Wéll:PI?n:3S-23;TrueNorth
'Vertic~I~T:V»)Refe~e,n~ei F\KBÞS~:8'MSL55,.8', Db:
Reference:
Error Model:
Scan Method:
Error Surface:
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Version: 2
Toolcode
Tool Name
CB-GYRO-SS
MWD
Camera based gyro single shot
MWD - Standard
9 5/8" Csg Pt.
7" Csg Pt.
Summary
".' <+,;,,:,~~~.~.....~.L~...·.·Off~et'Wellp~t'b..·.~.~'~~.."~;'.".~:,~~-~":,~~...'
:'$itè' ......... '··"··'····,W¢U'···' ,:. 'wenp~.t..h...·..:
I " '.,1,",',' I"
Kuparu k 3S Pad
Kuparu k 3S Pad
Kuparu k 3S Pad
Kuparuk 3S Pad
Kuparuk 3S Pad
Kuparu k 3S Pad
Kuparu k 3S Pad
Kuparu k 3S Pad
Kuparuk 3S Pad
Kuparuk 3S Pad
Kuparuk 3S Pad
Kuparuk 3S Pad
Kuparuk 3S Pad
Kuparuk 3S Pad
Kuparuk 3S Pad
Kuparuk 3S Pad
3S-14
3S-1 5
3S-16
3S-18
3S-22
3S-22
3S-26
3S-26
Plan: 3S-17
Plan: 3S-17
Plan: 3S-19
Plan: 3S-19
Plan: 3S-20
Plan: 3S-21
Plan: 3S-21
Plan: 3S-24
I, ,',
3S-14 V2
3S-15 V4
3S-16 V4
3S-18 V4
3S-22 (Rig Surveys) V8
Plan: 3S-22 V5 Plan: 3
3S-26 V2
3S-26A V3
Plan: 3S-17 V1 Plan: 3
Plan: 3S-17F V1 Plan:
Plan 3S-19F V2 Plan: 3
Plan: 3S-19 V1 Plan: 3
Plan: 3S-20 V1 Plan: 3
Plan: 3S-21 V2 Plan: 3
Plan: 3S-21F VO Plan:
Plan: 3S-24 V1 Plan: 3
)l~fèr~~çe, , orr~¢( , ',.qr~Çh····· N~·Ç(þ, NI~~~~~, '.'"i",.'.
'··'.MD··'·,,'·.: '.'1\4Í)' 'p~tance " Ärea, ., .", Qevbiû6n:', ,,~~r~~~~,'
,Jt ' , '·"H ' , ,.. .,.ft,' ' ft, 'ft,':,
297.39 300.00 180.44 5.45 174.99 Pass: Major Risk
392.46 400.00 159.85 6.99 152.88 Pass: Major Risk
297.18 300.00 141.18 5.65 135.53 Pass: Major Risk
635.64 650.00 92.83 11 .49 81.83 Pass: Major Risk
249.99 250.00 21.49 4.75 16.74 Pass: Major Risk
249.99 250.00 21.49 4.75 16.74 Pass: Major Risk
749.08 750.00 25.66 12.08 13.65 Pass: Major Risk
749.08 750.00 25.66 12.08 13.65 Pass: Major Risk
586.70 600.00 118.02 11.97 106.12 Pass: Major Risk
586.70 600.00 118.02 11.54 106.56 Pass: Major Risk
638.80 650.00 72.73 12.11 60.81 Pass: Major Risk
638.80 650.00 72.73 12.11 60.81 Pass: Major Risk
495.07 500.00 57.78 8.69 49.12 Pass: Major Risk
299.39 300.00 40.07 5.71 34.35 Pass: Major Risk
299.39 300.00 40.07 5.66 34.40 Pass: Major Risk
300.30 300.00 21.36 6.06 15.31 Pass: Major Risk
O ., F'''''\. r .¡.:. .. .. 1 f
:øi:l',~ 1;'\
... I M ¡ l:t i t d if'! ,'..2r
\>vHLDEfAlLS ANTI-COLLISION SETIINGS
:S'arrr- .SI·S .r:J-W Mnhing EMung LatilUd Longiwd< Slot Interpolation Method:MD Interval: 50.00
PI>n: 3S-23 11.6-~ -141.97 5993856.07 476013.11 7if23"39.63-1N 150'11'42.590W SIA Depth Range From: 28.10 To: 10552.00
Maximum Range: 1252.39 Reference: Plan: 3S-23 (wp03
SURVEY PROGRAM
Depth Fm Depth To SUlVeylPlan Tool Colour ToMD
- 200
2S,IO SOO.OO Planned: 3S-23 (wp03) VS CB-GYRO-SS - 400
- 600
SOO.OO 10552.00 Planned: 38-23 (wp03) VS MWD - 800
- 1000
1250
1500
1750
- 2000
- 2500 --22.1
0 - 3000
-105 105 - 4000
-100 100 - 5000 -20.0
- 6000
- 7000
- 8000
- 9000
-75 11000 -15.0
-50 -10.0
-25 / -5.0
<:::)
~ 270 -0 27(
~.:'.:;.~
G')
~. ~q (P ~iJS-24)
'"'. -26
-------:.-.
~Z~
--~
-50 -10.0
)
-75 -15.0
-100 -20.0
-105
--22.1
See MD Ine An TVD +:-I/-S +F/-W DLeg TFace VSec Target
I 28.10 0.00 0.00 28. 10 0.00 0.00 0.00 0.00 0.00
1 250.00 0.00 0.00 250.00 0.00 0.00 0.00 0.00 0.00
3 550.00 6.00 290.00 5~9.45 5.37 -14.75 2.00 290.00 11.98
~ 1997.62 62.30 2~8.20 1705.9~ -226.91 -743.99 ~.OO -44.16 776.55
5 8613.98 62.30 248.20 4781.79 -2402.80 -6182.81 0.00 0.00 6632.29
6 10228.8~ 30.00 2~8. 20 5885.80 ·2829.63 -7249.79 2.00 180.00 7781.04 3S (23)
7 10552.00 30.00 2~8.20 6165.66 -2889.63 - 7399.81 0.00 0.00 79~2.56
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [50ft/in]
From Colour To MD
0-200
200 - 400
400 - 600
600 - SOO
800 - 1000
1000 1250
1250 1500
1500 1750
1750 - 2000
2000 - 2500
2500 - 3000
3000 - 4000
4000 - 5000
5000 - 6000
6000 - 7000
7000 - 8000
8000 ~ 9001'
9000 11
~/
~
WElLPATH DErAILS
Plan: 35-23
N7ES
RKB = 55_8' MSL 55.8Oft
Ori"ain +'þ¡~ ~~VD
+NI-S
0.00 0.00 0.00
Rig:
Ref. Darum:
V.Section
Angle
249.76C
o
22.:
COMPA.'<Y DErAILS
P~~.£'_!nc.
~~'"
CakuJation Me1hod: Minimun Cut\·ature
Error System: ISCWSA
Sc.nM<thod: Trav Cyfuda Norlh
&ror Surfa= Ð!\>tical + Casing
W=iDg ~kthod: Rules Based
35-23 (wp03)
--- Approved Plan ---
Centre Separation [10ft/in]
[deg] vs Centre to
Travelling Cylinder Azimuth (TFO+AZI)
)
)
35-23 Drillina Hazards Summary
12-1/4" Hole / 9-5/8" Casino Interval
Risk Level I M itiqation Strate~y
Low Monitor cellar continuously during interval.
Event
Broach of Conductor
Gas Hydrates
Gravel/Sand Sloughing to
500'
Hole Swabbing/Tight Hole on
Trips
Possible thaw bulb / water flow
around 1200'
Lost Circulation
Low
Moderate
Moderate
Low
Low
8-1/2" Hole / 7" Casino Interval
Event
Shale stability in HRZ, K-1, and
Miluveach
High ECD and swabbing with
higher MW's required
Barite Sag
Differential Sticking
Abnormal Reservoir Pressure
Lost Circulation
Risk Level
Low
Moderate
Low
Moderate
Moderate
Moderate
If observed - control drill, reduce pump rates,
reduce drilling fluid temperatures, Additions of
Drilltreat.
Increase mud weight / viscosity, High viscosity
sweeps. Monitor fill on connections
Circulate hole clean prior to trip. Proper hole fill
(use of trip sheets), Pumping out of hole as needed.
Watch return viscosity for signs of thinning.
Increased mud weight/viscosity as needed.
Prevent by keeping hole clean. If losses occur -
reduce pump rates and mud rheology, use LCM
M itiqation Strate~y
Control with higher MW and proper drilling
practices.
Condition mud prior to trips. Monitor ECD's with
PWD tool while drilling across pay interval. Pump
and rotate out on trips as a last resort.
Good drilling practices as documented in well plan.
Periodic wiper trips. Do not leave pipe static for
extended period of time.
Follow mud weight schedule and do not fall behind.
Stripping Drills, Shut-in Drills, PWD Tools, Increased
mud weight as needed. Ensure adequate kick
tolerance prior to drilling pay interval.
Use PWD to monitor hole cleaning. Reduced pump
rates, Mud rheology, LCM. Use GKA LC decision
tree.
3S-23 Drilling Hazards Summary. doc
prepared by Scott Lowry
7/30/02
O R' s t"'" .~,.\ W9/
. 7' ~:' ..~: ...1' l i
,i ¡ l~ 1 ¡ \1 § '.. .~
Page 1 of 1
KRU - 35-23 Pr,,~ucer
Proposed Completion Schematic
Single Completion w/ Jet Pump Contingency
')
Conoc~illips
16"x30"
insulated ~ ~
conductor @ ~ ~
+/-109' MD ~ ~
~ ~
~ ~
TAM 9-5/8" Port.JI. d
Collar Stnd ~
Grade BTC ~
Threads (+/- ~
1000' MOITVD) ~
~
~
Surface csg. ~
9-5/8"40# L-80 ~
BTC (3940' MD I ~
2609' TVD)
Casing point
100' above the
C80 sand
C
Sand Perfs
(to be done
after rig moves
off)
Production csg.
7" 26# L-80
BTCM (+1- 10552'
MD)
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
...l
-.-:~
j
u
r i j;¡
~ ~ ~
~ Z ~
~ ~ ~
~ ~ i
,,~ ~.
~ ~ ~
~z:g
~~
~p
~ ~
~ ~
~ :z
~ :z
~ z
~ :z
~ L.......
~
"
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
"
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
-=
.:~}
-.~
~
~
~
~
~
~
~
~
~
.ìIIIi1.
þ~~~~
r
-- -.
Ii--
~
~
~
~
~
~
~
~
~
~
~
~
3-1/2" FMC Gen V tubing hanger, 3-1/2" L-80 EUE8RD pin down. Special Drift 2.91"
3-1/2", L-80, 9.3# EUE8RD Spaceout Pups as Required. Special
Drift 2.91"
3-1/2" Cameo DS Landing Nipple with 2.875" ID No-Go profile set @ +1- 500' MD.
Use of port collar at the discretion of the drilling team.
GLM Placement:
Valves #1-4: 3-Y2" x 1" KBUG
Place gas-lift mandrels at the following depths:
TVD Approximate MD
Placement TBD
Valve #5: 3-1/2" x 1-1/2" 'MMG' GLM wI DCR Dump Kill Valve (3000 psi casing to tubing
shear). 6' L-80 handling pups installed on top and bottom of mandrel.
1 Joint 3-1/2", L-80, 9.3# EUE 8rd Mod Tubing.
3-1/2" Baker 'CMU' sliding sleeve wI 2.813" Camco No-Go profile, EUE8RD
box x pin. 3-1/2" x 6' L-SO EUESRD handling pups installed above
1 Joint 3-1/2", L-80, 9.3# EUE Srd Mod Tubing.
6' Handling Pup Joint 3-1/2", L-SO, 9.3# EUE Srd Mod Tubing.
Baker 'SO-40' PBR.
Baker 7" x 3-1/2" 'SAB-3' Permanent Packer set +1- 100' MD above top planned perf.
Minimum ID through the packer 3.00".
6' Pup Joint 3-1/2", L-SO, 9.3# EUE Srd Mod Tubing.
3-1/2" Camco 'D' nipple wI 2.75" No-Go profile.
6' Pup Joint 3-1/2", L-SO, 9.3# EUE Srd Mod Tubing.
Baker 3-1/2" WL Re-entry Guide wI shear out sub. Tubing tail 50' above top planned perforation.
TD @ 10552' MD I 6166' TVD
(300' MD below Miluveach)
O ~'!~ ,q~' A !
. I R '.'/ î .,1.:: ',..,.IL\ ¡
(, ~;~ 'S ~ "".t ~ j ~
Scott L Lowry 3/11/03
)
)
S. K. ALLSUP-DRAKE 1031
PHILLIPS PETROLEUM COMPANY ~ J
700 G ST. A TO 1530 1':< -") AV} :<
ANCHORAGE AK 99501 DATE ~ý ./1 ?£(.)~14/311
6~1i~~~E 5, pre- of ItL!K.CA /f/a?CC I $ IOO.Oò
-- O~ ~ ~¡{¿ ~~~DjO.
A ~~~,~d~.r-nn1Ur"1I
DOLLARS L!J 0...11".",,1<.
~ ...~ CHASE Chase Manhattan Bank USA, N.A. Valid Up To 5000 Dollars
'-, ,"'W~oO""_~" ,~.."",,. r¡; f II JL /
~ MEMO ~---~-j¿~._~
I: 0 ;j ~ ~ 0 0 ~ ~ ~ I: 2 ~ aDo 0 0 ~ 2 7 2 5 7111 ~ 0 ;j ~
.r~~~~~\Q"~:'.~HR:I:~'1.'.::,~r.;r;~,!.':.1·:I¡1!¡~',iif.'I~·~{:.)IÇ;'~I,~1f¡~I,~~,,~,~¡;JtLI·¡"~I):~!FClm~l'W¡\{:;n¡llt~t¡,\M.~:;;~~'~'~U'l"t.::';I¡~r~ltr;~~Ç.\'}' ~1(f:~~,ì'ir:"r:..t,:.~,:~~,,';\!'~'þ:t".·~~I:~J!';~~',~~~~II.Þ't. ':¡;l:~::tm.)~lf~¡;:fi!.\t1,f."tII'1;").~·¿\'¡:'1:~w~m~&~]~'Mí~~~'Z',t~~4fr~~.".,~~f¡,~r,i.;'''¡;'~~'.~,;!j'~J.'I''',\I\r¡lb'.J'I.I:,~~.&~'f'~~~;:;f'.;,~r''','',1, .'
RECEIVED
MAR
Al . 1 4 2003
astra Oii & Gas
AnCh Cons. CQ~_
~e "''1IVfWl
'ì
l
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME K;et/ 3S-23
7 I~ 3-0 ýç-
CHECK WHAT
APPLIES
Rev: 07/10/02
Ojody\templates
PTD#
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to· be reported as
a function· of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(t), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approviilg a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WE~~4\P,~BMj'Î:\çB~çßç,~~ COMPANY ConocoPhillips
FIELD & POOL 490100 - Kuparuk River Unit
ADMINISTRATION
APPR
SFD
DATE
3/18/2003
(For Service Well Only)
(For Service Well Only)
(For Service Well Only)
ENGINEERING
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
DATE 29.
3/18/2003 30.
;/l'-C)7~;:
33.
(For Service Well Only) 34.
APPR
~
GEOLOGY
APPR
SFD
WELL NAME KRU 35-23
Initial Classrrype DEV /1-0Il
PROGRAM Exploratory (EXP)
GEOL AREA 890
Development (DEV) -!.... Redrill _ Service (SER) _ Well bore seg _ Annular disposal para req
UNIT No. 011160 ON/OFF SHORE On
1. Permit fee attached ...................................................................................................
2. Lease number appropriate ...... ... ... ... ... ... ... ... ... ... '" ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
3. Unique well name and number ...................................................................................
4. Well located in a defined pool...... ... ...... ...... ......... ......... ............ ...... ......... ......... ...... ....
5. Well located proper distance from drilling unit boundary ......... ... ... ... ... ... ... ... ... ... ... ... ... ... ...
6. Well located proper distance from other wells .......................................... ...... .................
7. Sufficient acreage available in drilling unit........................... ... ... ... ......... ...... ... ... ... ...... ....
8. If deviated, is we II bore plat included ... '" ... ... ... ... ... ... ... ... ...... ... ... ... ... ... ... '" ... ... ... ... ... '" ...
9. Operator only affected party ... ... ... ... ... ... ... ... ... ... ... '" ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... .
10. Operator has appropriate bond in force ... ... ... ... ... ... ... ... ,.. ... ... ... ... ... ... ... '" ... ... ... ... ... '" ...
11. Permit can be issued without conservation order ... '" ... ... ... ... '" ... ...... ... ... ... .,. ... .,. ... ... .....
12. Permit can be issued without administrative approval .....................................................
13. Can permit be approved before 15-day wait .,. ... ... ... ... ... ... ... ... ... ... ... ... ... '" ... ... ... ... ... '" ...
14. Well located within area and strata authorized by Injection Order #
15. All wells within 1/4 mile area of review identified... ... ... ... ... ... ... ... ... ... ... ... '" ...... ... ... ... '" ...
16. Pre-produced injector: duration of pre-production less than 3 months ... ... ... ... ... ... ... ... .., ... ..
17. ACMP Finding of Consistency has been issued for this project .........................................
Conductor string provided ................................,........................................................
Surface casing protects all known USDWs ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...'
CMT vol adequate to circulate on conductor & surf csg ... ... ... ... ... ... ... ... ... '" ... ... ... ... ... '" ..,
CMT vol adequate to tie-in long string to surf csg '" ... ... ... ... ... ... '.. ... ... ... ... ... ... ... ... ... .,. ....
CMT will cover all known productive horizons ... ... ... ... ... ... ... ... ... ... ... ... ... '" ... ... ... ... ... '" ...
Casing designs adequate for C, T, B & permafrost .........................................................
Adequate tankage or reserve pit ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... ... ... ... '" ... ... ... ... ... ... ..,
If a re-drill, has a 10-403 for abandonment been approved...... ... ... ......... ...... ...... ...... ... ... .
Adequate well bore separation proposed ... ... ... ... '" ... ... .., ... ... '" ... ... ... ... ... ... ... ... ... ... '" ....
If diverter required, does it meet regulations ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... .....
Drilling fluid program schematic & equip list adequate... ... ... ... ... ... ... ... ... ... ... ... ... ... ... '" ... .
BOPEs, do they meet regulation ... ... ... ... ... ... ... ... ... ... ... ... ... '" ... ... ... ... ... '" ... ... ... ... ... .....
BOPE press rating appropriate; testto ...................... 3500 psig ...... minimum..........
Choke manifold complies w/API RP-53 (May 84) ..........................................................
Work will occur without operation shutdown ... ... ... ... ...... .,. ... '" ... ... ... ... ... ... ... ... ... ... ... ... ...
Is presence of H2S gas probable ... ......... ... ... ... ... ... ... ... ... ... '" ... ... ... ... ... ... ... ... ... ... ... ....,
Mechanical condition of wells within AOR verified '" ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ....
35. Permit can be issued wlo hydrogen sulfide measures ... ... ... ... '" ... ... ... ... ... ... ... ... ... ... ... .....
36. Data presented on potential overpressure zones ... ... ... ... .,. ... '" ... ... ... ... ... '" ... ... ... ... ... .....
DATE 37. Seismic analysis of shallow gas zones........................................................................
38. Seabed condition survey (if off-shore) .........................................................................
3/18/2003 39. Contact name/phone for weekly progress reports [exploratory only} ... ...... .................. .....
GEOLOGY: ENGINEERING: RES. ENGINEERING: COMMISSION:
RPC: WGA: MJW: RR:
SFD:SFD TEM: rEM JDH: DTS: ()~ ,V03
SP: J(; ~.J
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
NA
NA
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
NA Not Applicable
NA Not Applicable
NA Not Applicable
NA Not Applicable
l
CFR 147.102(b)(3) exempts all aquifers lying directly below and 1/4 mile beyond the boundaries of the Kuparuk River Field.
No Annular disposal planned.
Not Applicable--No reserve pit planned. Rig is equipped with steel pits. Drilling waste to local annulus and/or G&1.
Not Applicable
Close approaches identified
Well is planned to be drilled without a diverter.
Maximum expected pore pressure 11.1. Planned mud weight, 11.6.
MASP = 2766, 3500 psi adequate, BOP tests likely to be 5000.
(
NA Not Applicable
Yes
Yes Expected pressure gradient in Kup C sand is 0.58 psi/ft. Mitigation strategy listed in Drilling Hazards Summary.
NA Not Applicable
NA Not Applicable
NA Not Applicable
Commentsllnstructions
)
)
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infonnation, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
)
)
Sperry-Sun Drilling Services
LIS Scan Utility
$Rev.ìsion: .3 $
LisLib $Revision: 4 $
Thu May 08 13:36:06 2003
Reel Heade.r:
Service namc........... ..LISTPE
Date.................... .03/0.5/01::
Origin. . . . . . . . . . . . . . . . . . . s1'S
Reel Name................UNh~OWN
Continuation Number......Ol
Previous Reel Name.......UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name.............LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 031 051 08
Orig.in.................. .STS
Tape Name................ UNKNOWN
Continuation Numbe.c......Ol.
Previous Tape Namc.......UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS Writ.ing Library. Scienti fie Technical Services
Physical EOF
Comment. Record
T}\PE HEADEE
Kuparuk
MWD/MAD LOGS
if
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
if
,JOB DATÞ.
3S-23
501032045300
Canoca Phillips Alaska, Inc.
Sperry-Sun Drilling Services
08-MAY-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
iV!WD RUN .3
MW0002381363
P. SMITH
1"1. THORNTON
#
SURFACE LOCATION
SECTION:
'I'OWNSHT t':
RANGE:
FNL:
I:'SL:
FEL:
FWL:
ELEVATION (F'T FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND T.F.VF.T.:
18
12N
8E
2560
1246
.00
55.20
?7.70
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPE.N HOLF. CASING
BIT SIZE (IN) SIZE (IN)
e.~üu 9.62~
ORILLF.RS
DEPTH (FT)
404U.U
#
RStvll\RKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE OE2THS ARE
~'1SI\SURE D OS E"I' I U-lO).
ALL VERTICAL DE~THS ARE TRUE VERTICAL DEPTH (TV D) .
a03-0Y 5
1/70{
) )
3. ¡VIWD RUNS 1 & 2 WERE DIRECTIONAL ONLY - NO DAT1\ ARE
PRESENTE D.
1. MWD RUN 3 COMPRISED DIRECTION1\L WITH DUAL GAMM,1\ RAY
(DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE
RESISTIVITY -
PHASE 4 (EWR4); COMPENSATED THERMAL NEUTRON POROSITY
(CTN); STABILIZED
LITHO-DENSITY (SLD); ACOUSTIC CALIPER (ACAL); AND
PRESSURE WHILE
DRILLING (Plr'JD).
5. MWD DATA ARE CONSIDERED PDC PER E-MAIL AUTHORIZATION
FROM THE GKA
GEOSCIENCE GROUP.
6. MWD RUNS 1 - 3 REPRESENT WELL 3S-23 WITH API#:
50-103-20453-00.
THIS WELL REACHED A TOTAL DEPTH (TO) OF 10535'MD I
6130'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SGRD SMOOTHED NATURA.L GAMMA RAY.
SEXP SMOOTHED PHÞ-.SE SHIFT-DERIVED RESISTIVITY (EXTRF-.
S.H.ALJ...,OW S PACI.NG) .
SESP = SMOOTHED PHASE SHIFT-DEIUVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHI~r-DERIVEO RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP).
TNPS= SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE
MATRIX, ACAL-DERIVED
HOLE, SIZE).
CTFA SMOOTHED AVERl\GE OF F.,l\R DETECTOR I S COUNT RATE.
CTNA SM001'HED .AVERAGE OF' NEAR DE'['ECTOR I S COUNT RATF..
SBD2 SMOOTHED BULK OENSITY-COMPENSl\TED (LOW-COUNT
BIN) .
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN).
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR (LOW-
COUNT BIN).
SLDSLIDE = SLIDE INTERVAL AD~rUSTED FOR THE SLD
SENSOR-TO-BIT DISTANCE
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: ACAL-DERIVED (8.5" BIT)
MUD WEIGHT: 9.0 - 11.5 PPG
MUD SALINI'!'Y: 500 PPM CHLORl DE,S
FORtviATION WATER SALINITY: 25000 PP¡v¡ CHLORIDES
FLUID DENSITY: 1.0 GIce
MATRIX DENSITY: 2.65 Glee
LITHOLOGY: SANDSTONE
$
~'ile He der
Serv ce name.............STSLIB.OOl
Serv ce Sub Level Name...
Vees on Number.. .........1.0.0
Date of Generation.......03!05!OS
Maximum Physical Record..65535
F'1l e 1'y-pe................ LO
Previous !:'ile Name.......STSL1B.OOO
Comment:. Rer:oed
fILE HEADER
FILE NU¡VIEER:
1
EDITED MERGED MWD
Def.'L.h shi[L.ed dfld clipped CUIves; dll bil .curlS !ile.l'~F='.j.
DEPTH INCREMENT: .5000
#
FILE SUMMARY
PBU TOOL CODE.;
ROP
NCNT
FCN'I'
FET
RPD
RPM
RPS
RPX
PEF
GR
DRHO
RHOB
NPHI
$
)
STAE'I' DEPTH
4012.5
4012.5
401/:.5
4012.5
4012.5
4012.5
4012.5
4012.5
4012.5
4020.0
4040.0
4040.0
4051. 0
)
STOP DE;PTH
10::">35.0
10447.0
10447.0
10496.0
10496.0
10496.0
10496.0
10496.0
J0460.5
10503.S
10460.5
10460.5
10448.0
#
BASELINE CURVE FOR SHIFTS:
CUEVE SHIFT DATA (ME;/-\.SURED DE;PTH.)
--------- EQUIVALENT UNSI-IIF'I'ED DEPTH ---------
BASELINE DEPTH
$
II
MERGED DATA SOURCE
PBU TOOL CODE
M'"II'JD
$
#
REMARKS:
BIT RUN NO MERGE TOP
3 4012.5
MERGED MAIN PASS.
$
MERGE.; BASE
10535.0
II
Data Format Specification Record
Data Record Type..................O
Data Spec:.i ficat.ion Block 'Type..... 0
Logging Direction.................Down
Optical log depth units.. .........Feet
Data Referenc:e Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undcfined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-typc...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H Ii 1 68 4 ~,
GR MWD .7:\ PI 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS HWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 ']
FST HWD HOUR 4 1 68 28 8
NPIII ~1í^J D pu-s 4 1 68 32 C\
FCNT MWD CNTS 4 1. 68 36 1.0
NCNT MWD CNTS 4 1 68 40 11
RHOB MÍ^JD G/CM 1 1. 68 "14 12
DRHO MWD G/CM 4 1 68 48 13
E'E F MWD BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Readin':J
DEPT FT 401:2.~J 105J~, 7273..75 1304 G 4012.5 1053:::,
ROP MT^!D E'T I H 2. -19 -195.2 17-1.922 130-16 '1(112.5 1')535
GR MWD API 4':J.J2 416.1~ 121. U~ 12':J6B 4020 lUbUJ.b
RP;":: HWD o HNi"1 0.17 495.31 4.24492 12968 4012.5 10496
RPS JvllJlJD OHM.."1 0.11 1517.39 4.19183 12968 '1012.5 10196
RPM HWD OHMM 0.24 :2000 6.66318 12968 4012.~ 10496
R.PD Mvm Oí-1HH 0.16 20GO 10.567 12968 4012.5 104%
FET t':¡^JD HOUR 0.1361 68..6225 0.93302 12968 ~1012..5 lO~96
NPHI MWD pu-s 13.72 51.81 32.2408 12771 4051 10448
tCNT ìvfv'JD CNTS 527..8 2492.2 993.:377 128ÎO 4012.5 l("J 4 ,:1";:
tlCNT M~\1D CNTS 107872 189950 136713 12870 101:2..5 1 011 "7
RHOS M~'lD r':;/CM 1. 77 2.93 2.31013 12842 4040 10460.5
DRI-JO Mì'JD
PE F' MWD
G/CM
BARN
)
-0.065
1. 89
0.31
12.44
)
0.0375909 12842
2.97371 12897
4040
4012.5
10460.5
10460.5
First Reading For Entire File..........4ü12.~
Last Reading For Entire File...........l0535
File Tl:ailer
Service name.............STSLIß.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Gcneration.......03/05/08
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.002
Physical EOF
Fi Ie Header'
Service name.............STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Gencration.......03/05/08
Maximum Physical Record..65535
File Type................ 1,0
Previous File Name... ....8T3LI8.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
II
FILE SUMMARY
VENDOR TOOL CODE
ROP
NCNT
FCNT
E'E:T
RPD
RPI'1
RPS
RPX
PEF
GR
DRHO
RIIOB
NPHI
2
header data for each bit run in separate files.
3
.5000
Q
'T'
START DEPTH
4012.5
4012.5
1012.5
4012.5
4012.5
4012.5
4012.5
4012.5
4012.5
4020.0
4040.0
4040.0
4051.0
il
LOG HEADER DATA
Dl\TE LOGGED:
SO FTWf'.RE
SURFACE SOFTWARE VERSION:
DOI'JNIIOLE SOFTNARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTEnVAL ([''1'):
BOTTOM LOG INTERVf'.L (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MIN IMUM .l\NGLE:
HAXIMUM ANGLE:
DGR.
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
EI^!R,1
SLD
CTN
STOP DEPTH
10535.0
10447.0
10447.0
10496.0
10496.0
10496.0
10496.0
10496.0
10160.5
10503.5
10460.5
10460.5
10448.0
DU,i;L GAH?-lA RAY
SLECTROMAG. RSSIS.
STABILIZED LITHO DEN
COMP THSRtvlJ\L NEUTRON
16-l\PR-03
Insite
66.37
Memory
10535.0
4050.(1
10535.0
29.6
64.'1
TO()L NUI'JE.ER
155""79iJ
136'7/1 '?
1:251u4
17995'1
')
$
il
BOREHOLE ~~D CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S C?-..SING DEPTH (FT):
8.500
4040.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (L8/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEM.PERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (1'11'):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
Based
Water
11. 30
48.0
8.2
400
2.0
2. '/00
1. 370
2.800
4.000
70.0
145.0
70.0
70.0
11
NEUTRON TOOL
MATIUX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
il
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
11
REM.Ä.RKS :
$
H
Data Format Specificati.on Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point...... ........Undefined
Frame Spacinq..................... 60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4. 1 68 4. ,',
GR MWD030 API 4 1 68 8 3
RPX HWD030 OHHH 4 1 68 12 4
RPS 1'1WD030 OHMM 4 1 68 16 5
RPM MWD030 OHHH 4 1 68 20 6
RPD MWD030 OHHH 4 1 68 24 7
E'E'.T MWD030 HOUR 4. 1 68 28 8
NPHI MHD030 PU-S 4 1 68 32 9
FCNT MHD030 CNTS 4 1 68 36 10
NCNT MWD030 CNTS 4 1 68 40 11
RHOB MWD030 G/CM 4 1 68 44 12
DRUO Mí<'JD030 G/CM 4 1 68 48 13
PEE' MWD030 BARN 4 1 68 52 14
Firct L.J.st
Name Service Unit Min Max Mean Nsam Reading Reacii n'::1
DEFT FT 4012.5 1053::1 7273.75 13046 4012.5 lO:<3S
ROP Mt>IJD030 FT/H 2.19 195.2 171.922 130t16 1012.5 lCI535
GR MWDUJU API 49.:52 416.1::' ILl. 12::' 12968 4(12(1 l(1::'UJ.~
RE'X i"íí1D030 OHÌ"íI'l 0.17 495.31 4.24492 12968 4012.5 10496
RPS Mí"lDO 3 0 OHM.1'vJ 0.11 1517.39 1.19183 12968 1012.5 10496
RPM MWD030 OHMM 0.24 2000 6.66:318 12968 4012. S 10496
RPD tv¡WD030 OHHi-l 0.16 2000 10.567 12968 4012.5 10496
fCT t·n~JD030 ¡lOUR 0.1361 68.6225 0..93302 12968 ~O12..5 10.:1 9(21
NPHI MWD030 PI)-S l3o-?:: 51.81 32.2408 12771 4051 lC!44ti
tCNT ì-ï1"iD030 CNTS 52ì..8 2,192.2 993..877 12870 4012.5 1,]44'ì
1'JCl'JT M'S^JD030 CNTS 10787:2 189950 136713 12870 1 rî 1 .-) t:; lOll "l~;
RH08 ¡vnIllDO 3 0 G/CM 1. 77 2.93 2.31013 12842 4040 10460.5
DR.HO I"lWD030 G!CM -0.065 0.31 0.0375909 12842 404ü 1ü460.5
\
ì
PEF MWD030 BARN
1.89
12.11
2.97371 12897
4012.5
10460.5
First Reading For Entire File..........4012.5
Last Reading For Entire File...... .....10535
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/05/08
Maximum Physical Record..65535
File Type................ LO
Next File Name.. .........STSLIB.003
Physical EOF
Tape Trailer
Service name.............LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/05/08
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOli'JN
Continuation Number......01
Next Tape Name...........UNKNOWN
Comments. ................STS LIS Writing Library. Scientific Technical Services
Reel T raileL"
Service name.............LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03/05/08
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name................ UNKNOI'\TN
Continuation Number......Ol
Next Reel Name...........UNKNOWN
Comments.................STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End or LIS FUe