Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
203-108
, /Image F _ ~ject Well History File Cc.. _~r Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ 0::3 - 1 02; Well History File Identifier Organizing (done) o Two-sided 111111111I111111111 D Rescan Needed I RESCAN DIGITAL DATA OVERSIZED (Scannable) D Maps: D Other Items Scannable by a Large Scanner D Color Items: D Greyscale Items: D Diskettes, No. D Other, NolType: D Poor Quality Originals: OVERSIZED (Non-Scannable) D Other: D Logs of various kinds: BY: Helen ~ D Other:: .¡ Date: 7. b OS iJ 15/11< . ~ 1- III Date:? b 'C6 /5/ fîf = ¡TOT AL PAGES ,,=) (CouQt;Jœ~ nc: include cover sheet) \ 1\11 1) Date:' (P (),~ /5/ V'VI , ' I11I NOTES: Project Proofing BY: Helen (Maria ) Scanning Preparation I x 30 = ~() + t BY: Helen (Maria ) Production Scanning Stage 1 Page Count from Scanned File: .3~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES NO (. 1 Z) Date:\' ~ ()5 /51 M Heien C Maria) BY: Stage 1 BY: If NO in stage 1, page(s) discrepancies were found: YES NO Date: /5/ II! 1111111111111111 11I1111111111111111 I Date: 15/ Quality Checked 1111111111111111111 Helen Maria Scanning is complete at this point unless rescanning is required. ReScanned BY: Helen Maria Comments about this file: • • -~,- -,~ ~ _ :~ ~° ~~:' .z ^~~. MICROFILMED 03/01 /2008 DD NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:1LaserFiche\CvrPgs_Inserts\Microfilm Marker.doc RE: Status of some Wells ) Subject: RE: Status of some Wells From: "Allsup-Drake, Sharon K" <Sharon.K.Allsup-Drake@eonoeophillips.eom> Date: Wed, 22 Dee 2004 10:03: 15 -0900 To: Thomas Maunder <tom_maunder@admin.state.ak.us> Tom - concerning 3S-20 - we did not drill this well. At this point in time, we will keep it active until it meets the normal expiration date. Thanks, Sharon office phone: 263-4612 fax: 265-6224 -----Original Message----- From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Friday, December 17, 2004 3:37 PM To: Allsup-Drake, Sharon K Subject: Status of some Wells Hi Sharon, I was reviewing a report titled "Outstanding Wells" and I have a couple of questions for you. 3N-18L1 (203-019) and 3N-18L2 (203-018) were permitted in early 2003. The L1 segment is shown to be completed. What about L2?? I did not do ~ w~ºle lot of research between the files. c. 3S-20 (203-108), was this well drilled?? Permit expires June 20, 2005// 2N-311 (204-063). The last information I show in the file is the sundry requesting suspension. It does not appear that any follow-up 407 was filed. The only other wells out there are ones that have had recent (October/November/December) activity. Thanks in advance for the help. Hope you and yours have good holidays. Tom Maunder, PE AOGCC 1 of 1 4/20/2005 12:08 PM ) ) ;' {r""'.~. r~ : 1[1 1.. n.. .' ¡ j.... ,U I' ~~, ... .7\\ [, _\1 I"f~\ (~J, J ~{l fM. L~~ i lJ ,·l)) I \ ' # ~-\\ tIJ _.::JW cs J~u\~ FRANK H. MURKOWSKI, GOVERNOR AliASKA. OIL AND GAS CONSERVATION COMMISSION 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 R. Thon1as Kuparuk Drilling Team Leader ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Unit, 3S-20 ConocoPhillips Alaska, Inc. Permit No: 203-108 Surface Location: 2547'FNL, 1188' FEL, SEC. 18, TI2N, R8E, UM Bottomhole Location: 1896'FSL, 6'FWL, SEC. 24, TI2N, R7E, UM Dear Mr. Thomas: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). S incerel y, RS:6dt~~ Commissioner BY ORDER OF THE COMMISSION DATED this:leday of June, 2003 cc: Department of Fish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. Exploration, Production and Refineries Section .~...) ConocoPhillips ) Post Office Box 100360 Anchorage, Alaska 99510-0360 Randy Thomas Phone (907) 265-6830 Fax: (907) 265-1535 Email: randy.l.thomas@conocophillips.com June 13, 2003 Alaska Oil and Gas Conservation Commission 333 West ih Avenue Suite 100 Anchorage, Alaska 99501 (907) 279-1433 Re: Application for Permit to Drill, Injector 3S-20 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore Injector well, KRU 3S-20, a development well. Note that it is planned to drill the surface hole without a diverter. There have been 15 development wells drilled on 3S pad with no significant indication of gas or shallow gas hydrates. Please find attached for the review of the Commission the information required by 20 ACC 25.005 (c). The spud date is expected to be approximately 7/5/03. If you have any questions or require any further information, please contact Skip Coyner at 265-6074. Sincerely, ~\~ - Randy Thomas GKA Drilling Team Leader c. r~ ECE.\\JC:"u B: - '1 1\\\\3 ","-, \ ..' c;\~\~··\ JU\~ .1"~.;J1'V~ " (,Û'Í',IS.'\;) . .... ,..,,,> t.¡j\1~¡' ., & \;..:.\-.¡ \( ~ Q\\. \.. 'I' 'òG.s ~\'ð~\'\)\ Þ.\,~¡,\ß. " OR1GINAL ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ) Þ-Cl<;' PERMIT TO DRILL 20 AAC 25.005 1 a. Type of Work: Drill 11] Re-entry 0 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: Redrill U 1 b. Current Well Class: Stratigraphic Test 0 P.O. Box 100360 Anchorage, AK 99510-0360 4a. Location of Well (Governmental Section): Surface: 2547' FNL, 1188' FEL, Sec. 18, T12N, R8E, UM' Top of Productive Horizon: 2061' FSL, 248' FWL, Sec. 24, T12N, R7E, UM Total Depth: 1896' FSL, 6' FWL, Sec. 24, T12N, R7E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 476072 y- 5993869 Zone- 4 16. Deviated wells: Kickoff depth: 200 ft. Maximum Hole Angle: 67° 18. Casing Program Size Specifications Hole Casing Weight Grade Coupling Length 42" 30 x 16" 62.5# B Weld 80' 12.25" 9.625" 40# L-80 BTC 3506' 8.5" 7" 26# L-80 BTC-M 9975' 19 Total Depth MD (ft): PRESENT WELL CONDITION SUMMARY Total Depth TVD (ft): Plugs (measured) Casing Structural Conductor Detailed Operations Intermediate Production Liner Perforation Depth MD (ft): Length ExploratoryU Development Oil U Multiple Zone D Service 11] Development Gas 0 Single Zone 0 5. Bond: ~ Blanket U Single Well 11. Well Name and Number: Bond No. 59-52-180 3S-20 6. Proposed Depth: 12. Field/Pool(s): MD: 12900' TVD: 6011' Kuparuk River Field 7. Property Designation: ALK 25544 8. Land Use Permit: Kuparuk River Oil Pool 13. Approximate Spud Date: 7/5/2003 ADL 2639 9. Acres in Property: 2560 14. Distance to Nearest Property: 1896' at TD 15. Distance to Nearest 10. KB Elevation Well within Pool: 3S-21 , 21' @ 300' (Height above GL): 28 feet 17. Anticipated Pressure (see 20 AAC 25.035) Max. Downhole Pressure: 3414 psig 1 Max. Surface Pressure: 2766 psig Setting Depth Quantity of Cement Bottom c. f. or sacks TVD (including stage data) 108' 88 sx ArcticCrete 2611' 490 sx AS Lite & 400 sx LiteCrete 6011' 300 sx Class G Top MD TVD MD 108' 4258' 12900' 28' 28' 28' 28' 28' 28' (To be completed for Redrill and Re-Entry Operations) Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured) Size Cement Volume TVD Commission Use Only API Number: Permit Approval. ( 50- \(J ~ - ðal.\bd~ 00 Date: '/'LLJ ~3 DYes gNo Mud log required D Yes ~ No Directional survey required 20. Attachments: Filing Fee 0 Property Plat D BOP Sketch 0 Diverter Sketch D Drilling Program 0 Seabed Report 0 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name R. Thomas Signature \ ~\~- Permit to Drill Number: J~ ~ - \ '\) ~- Conditions of approval : Samples required Hydrogen sulfide measures MD RECE~VE JUN 1 7' 2003 Perforation Depth TVD (ft): Ah:I~'iu.l Oil &. GG\;S Cum~. Gu~!!¡n;;)ÛOI1 Anchorage Shallow Hazard Analysis D 20 AAC 25.050 requirements 0 Time v. Depth Plot U Drilling Fluid Program 0 Date: Contact Skip Coyner 265-6074 ~C- Title Kuparuk Drilling Team Leader G/l?(ð ? Phone CbS-· 6 -8? ò Date PreDared bv Sharon AI/SUD-Drake See cover letter for other requirements D Yes ~ No 18 Yes D No Other: ~SUC) ,,~"\ M.\t'"'\\tv\<0\M...\S"G"Ç' -\-e:~~ APp~OVedbY , .f Á ~"'-~ ,,_ ÇqjMI¡;S,?NER ~~ked 3/2oJ!J.N ~ lOO3., .. " ,I b .~ " ,.. /; 1I!f". i~1I,~'~J~~ \J\:l. \ $ ~~-\ ~~~\\~ \c~ Date ði:~¿~? \ BY ORDER OF THE COMMISSION ) Ar'·'\ation for Permit to Drill, We1l3S-20 ! Revision No.O Saved: 13-Jun-03 Permit It - Kuparuk Well 35-20 Application for Permit to Drill Document MQxir'l'1izE Well "'ClUE; Table of Contents 1. Well Name...... ........... ...... ...... .......... .......... .... .... .......... ... ... ........ ........ .......... .... ... ....... 2 Requirements of 20 AAC 25.005 (f).................................................. ................. ......... ............................2 2. Location Summary.... .... ........ ...... ...... ... ..... .... .................. ... ....... ........ .... ...... ......... .... 2 Requirements of 20 AAC 25. 005( c)(2) ......... .......... ............ ........................... ..................... ......... ...........2 Requirements of 20 AAC 25. 050(b)........................... .......... ............................................. ........ ........ ......2 3. Blowout Prevention Equipment Information ......................................................... 3 Requirements of 20 AAC 25.005(c)(3) ... ........ .......... ...... ...................................................... .................. 3 4. Dri II i ng Hazards Information ... ..... ...... ..... ....... ........... ... .... ....... ........ ... .... ..... ..... ....... 3 Requirements of 20 AAC 25.005 (c)( 4) ............. ............................... ....................... ..... ................. .........3 5. Procedure for Conducting Formation Integrity Tests ........................................... 3 Requirements of 20 AAC 25.005 (c)(5) ..... ............ ............. ............................... .............. ................ ....... 3 6. Casi ng and Cementing Program.............................................................................4 Requirements of 20 AAC 25.005(c)(6) ............ .............................................. ......................... ................4 7. Diverter System Information.. ....... ..... ..... .... .... .... ..... .......... ............. .... ... ..... ..... ....... 4 Requirements of 20 AAC 25.005(c)(7) ...... ...... ................................. ................ ........ ........................ ...... 4 8. Dri II i ng FI u id Program ..... ....... .... ....... ........ ... .............. ...... ........ ...... ... ......... ..... ..... ... 4 Requirements of 20 AAC 25.005(c)(B) ................... .............................. .............................. .................... 4 9. Abnormally Pressured Formation Information ...................................................... 5 Requirements of 20 AAC 25.005 (c)(9) ....................................................................... ..................... ......5 10. Seismic Analysis. ......... ............. ........ ... ..... ......... ... ........... ......... ......... ... ... ... ............. 5 Requirements of 20 AAC 25.005 (c)(10) ... .................................................................................. ........... 5 11. Seabed Condition Analysis .....................................................................................5 Requirements of 20 AAC 25.005 (c)(11) ............................. ..................................................... .............. 5 12. Evidence of Bondi ng . .......... ... ...... ........... ........... .......... ............. ...... .... ... ... ....... ....... 5 Requirements of 20 AAC 25.005 (c)(12) .................. ..... ........................ .......... ......... ............ ............ ......5 13. Proposed Drilling Program .....................................................................................6 o /ì j '-'í . j J' L 3$-20 PERMIT IT. DOC Page 1 of 6 Printed: 13-Jun-03 ) Ar .,,~, ation for Permit to Drill, Well 3S-20 , Revision No.O Saved: 13-Jun-03 Requirements of 20 AAC 25.005 (c)(13) ................... .......................... ........................... ........................ 6 14. Discussion of Mud and Cuttings Disposal and Annular Disposal....................... 6 Requirements of 20 AAC 25.005 (c)(14) ... .......................... ..................... ...... ...................... .................. 6 15. Attachments ........ .......................... .... ... ............ ... ........... ....... ....... ......... ...... ....... ...... 6 Attachment 1 Directional Plan............................................................................................................... 6 Attachment 2 Drilling Hazards............................................................................................. 6 Attachment 3 Well Schematic............................................................. .................................6 1. Well Name Requirements of 20 AAC 25.005 (f) Each well must be Identified by a unique name des~qnated by th(;: operator and a unique API number assigned by the commission under 20 AAC 25,040(b). For a well with multiple well branche:..-;, eaLl1 branch must slmllady be Identified by a unique name and API number by adding a suffix to the name deslqnated for the well by the operator and to the number as.':;igned to the well by the commlss'ion. The well for which this application is submitted will be designated as 35-20. 2. Location Summary Requirements of 20 AAC 25.005(c)(2) An applicatìon fòr a Permit to Drill fl7l/St be accompanied by each of the following item~ except for an Item already on file wìth the commlssìon and Identified li7 the application: (2) a plat identifyJi1g the property and the propefty's owners and showing (A)the coordinat<~s of the proposed location of the well at the surfåce/ at the top of each oþjective formation and at total depth referenced to governmental section lines" (8) the coordti1ates of the proposed location of the well at the surface/ referenced to the state plane coordinate system for this state as maintained by the National Geodetìc Survey in the National Oceanic and Atmo5pheric: Administration/ (C) the proposed depth of the well at the top of eacfl objective formation and at total depth/ Location at Surface NGS Coordinates Northings: 5,993,869 12547' FNL,' 1188' FEL, Sec 18, T12N, R8E, UM RKB Elevation Eastings: 476,072 Pad Elevation 56.1' AMSL 28.0' AMSL Location at Top of Productive Interval (Kuparuk "C" Sand) NGS Coordinates Northings: 5,987,950 2061' FSL, 248' FWL, Sec 24, T12N, R7E, UM Eastings: 467,400 Measured Depth, RKB: Total Vertical Depth, RKB: Total Vertical Depth, 55: 12582' 5886' 10499' Location at Total Depth 11896' FSL, 6' FWL, NGS Coordinates Northings: 5,987,786 Eastings: 467,158 Sec2~T12N,R7E,UM Measured Depth, RKB: Total Vertical Depth, RKB: Total Vertical Depth, 55: 12900' 6011 ' 10792' and (0) other information required by 20 AAC 25.050(b)/ Requirements of 20 AAC 25.050(b) If a well is to be Intentionally devlate~ the application for a PermIt to Drill (Form 10-401) must (1) include a pla¢ drawn to a sUItable scale/ showing the path of the proposed wellbore/ including all adjacent well bores within 200 feet of any portion of the proposed well,' Please see Attachment 1: Directional Plan O ""'~ ../'f'>: I., , 1 :¡ ~~:l ~ ,II! ¡ ,~ , I," . 35-20 PERMIT IT. DOC Page 2 of 6 Printed: 13-Jun-03 ') Ar' '\ation for Permit to Drill, We1l3S-20 ) Revision No.O . Saved: 13-Jun-03 and (2) for all wells within 200 feet of the proposed wellbore (A) list the names of the operators of those well.~ to the extent that those names are known or discoverable 1i7 public record~ and show that each named operator has been fumi511ed a copy of the applic.-ation by certitìed m8l~' or (8) state that the applicant is the only affected owner. The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) An application lor a Permit to Drill must be accompanied by each ol the following Items~ except for an Item already on file with the commission and identified in the appllÓ1tion: (3) a diagram and description olthe blowout prevention equipment (80PE) as required by 20 AAC 25.035, 20 AAC 2.'i.03~ or 20 AAC 25.03~ as applicable/' Please reference BOP schematics on file for Nabors 7E5. 4. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An applic-atíon for a Permit to Drill must be accompanied by each of the tollowing item5~ except tor an Item already o{] file with the commis..c,ion and ídentitìed in the application: (4) inlormatio{] on dlilling hazalds" ineluding (A) the maximum downhole pres"Svre that may be encounterect cnteria used to determine it and maxirnum potentÌi7ls'lJrface pressure based on a methane gradient; A pressure build-up test performed on Palm lA (35-21) in 4/01 indicated a reservoir pressure in the Kuparuk C sand of 3597 psi at 5830' tvd, 0.62 psi/ft or 11.9 ppg EMW (equivalent mud weight). Due to pressure depletion, the predicted reservoir pressure for 35-20 is predicted at 3400 psi at 5886' tvd, 0.58 psi/ft or 11.1 ppg EMW. The maximum potential surface pressure (MP5P) while drilling 35-20 is calculated using above maximum reservoir pressure, a gas gradient of 0.11 pSi/ft, and the Kuparuk C sand target at 5886' tvd: MP5P =(5886 ft)*(0.58 - 0.11 psi/ft) = 2766 psi (8) data on potential gas zones; The well bore is not expected to penetrate any gas zones. and (C) data concerning potential causes of hole problems such as abnormally geo-pressured -"trata, lost circulation zone~ and zones that have a propensity for differential sticking; Please see Attachment 2 - Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC 25.005 (c)(5) An application for a Permit to Drill must be accompanied by each of the following items" except for an item already on file with the commission and Identified in the application: (5) a description of tl7e procedure for conducting formation integrity tests, as required under 20 MC 25.030(f}; A procedure is on file with the commission for performing LOT's. For 35-20 the procedure will be followed with one exception. The surface casing shoe will be pressured until leak-off occurs and the 16.0 ppg EMW maximum will not be observed. (see step 6 in the procedure) OR. " 1''\ I! A' ",' .,' . I' · .¡1~Þ'; ,j ~. 1: t~ 3$-20 PERMIT IT. DOC Page 3 of 6 Printed: 13-Jun-03 ) Ar "~)ation for Permit to Drill, Well 38-20 Revision No.O . Saved: 13-Jun-03 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be acc:ompanied by each of tile following Item5~ exæpt for an Item already on file with the commis-:'''lon and identified in the applk",;ltion: (6) a complete proposed ca!Jìi7g and cementing program as required by 20 MC 25.030" and a description of any :..1otted liner, pre- pelforated liner, or screen to be li7stalle(Í' Casinq and Cementinq Program Hole Top Btm CsglTbg Size Weight Length MDITVD MDITVD OD (in) (in) (/blft) Grade Connection (ft) (ft) (ft) Cement Program 30 X 16 42 62.5 H-40 Welded 80 28'/28' 108 / 108 9 cy High Early Insulated 9-5/8 12-1/4 40 L-80 BTC 3506' 28'/28' 4258'/2611' Lead: 490 sx 10.7 ppg ASL Tail: 400 sx 12.0 ppg 'LiteCRETE', 2.40 ft3/sk I Planned TOC= Surface 7 8-1/2 26 L-80 BTC-Mod 9975' 28'/28' 12900'/6011' 300 sx 15.8 ppg 'G' w/ add. Planned TOC= 11530' 3-1/2 9.3 L-80 EUE 8rd 9575' 28'/28' 12280'/5767' SAB-3 PKR set ~ 12280' MD Mod ~ 300' MD above Kuparuk C If 7" casing must be top-set above the Kuparuk C sand, 6-1/8" hole would be drilled to total depth and a 3-112", 9.3 ppf, L-80 SLHT production liner will be cemented across the productive interval. 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following item~ exæpt for an Hem already on file with the commis..-:,ion and identified in the application: {7} a diagram and desaiption of the diverter system as required by 20 MC 25.035; unle:..'"!J" this requirement is waived by tile commis-:'''lon under 20 AAC 25.035(11)(2); Ref: diverter schematic on file for Nabors 7ES. ConocoPhillips plans not to use a diverter on well 35-20. 8. Drilling Fluid Program Requirements of 20 AAC 25.005(c)(B) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the applk-ation: (8) a drilling flUid program, including a diagram and desCliption of the drilling fluid system, as required by 20 AAC 25.033; Drilling will be done using mud systems having the following properties: Surface Hole mud properties Spud to Base of Permafrost Initial Value Final Value 8.6 9.0* 120-130 120-130 35-45 27 -40 Yield Point (cP) Base of Permafrost to Total Depth Initial Value Final Value 9.0* 9.4* 120-130 120-130 25-35 20-30 Density (ppg) Funnel Viscosity (see) Plastic Viscostiy 8-15 (lb1100 sf) 10 see Gel Strength 1 0-30 10 min Gel Strength 25-55 pH 8-9 API Filtrate(cc) 12-15 * 9.8 if hydrates are encountered 11-22 1 0-25 25-55 8-9 7-8 15-30 10-25 20-40 8-9 7-8 15-30 1 0-25 15-35 8-9 7-8 011""::,· . l-'~ ~ .,1," It ~ .1'1 ~ , i1 , 3S-20 PERMIT IT. DOC Page 4 of 6 Printed: 13-Jun-03 ) Ar..':....Jation for Permit to Drill, Well 3S-20 Revision No.O Saved: 13-Jun-03 Production Hole mud properties initial C40 Top Morraine Top HRZ Kuparuk Density (ppg) 8.8 10.2 10.6 10.8 11.8 Funnel Viscosity 40-55 42-55 42-58 42-58 42-58 (seconds) Yield Point 11-15 20-25 20-25 20-25 20-25 (cP) Plastic Viscostiy 6-12 8-15 8-16 8-18 15-25 (lb1100 sf) 10 second Gel 2-5 3-6 3-6 4-7 4-8 Strength (lb1100 sf) 10 minute Gel 4-10 7-10 7-112 7-12 8-16 Strength (/b1100 sf) pH 9-9.5 9-9.5 9-9.5 9-9.5 9-9.5 API Filtrate(cc) <6 <6 <6 <4 <4 Solids (%) 6-11 9-14 1 0-15 1 0-15 15-19 Diagram of Nabors 7ES Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. 9. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c)(9) An applk:ation for a Permit to Drill must be accompanied by each of the following item!;,~ except for an item already on file with the commis.....,-¡on and identified in the application: (9) for an exploratory or stratigraphic te5"t we/~ a tabulation s-etting out the depth~' of predicted abnOlmally geo-pressured strata as required by 20 MC 25.033(f);: N/ A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) An applicatio/7 for a Permit to Drill must be accompanied by each of the following itemS¡, é?Xcept for an item already 0/7 file with the commission and identtfied in the application: (10) for an exploratory or stratigraphic test well, a seismic refraction or reflection analysis as required by 20 AAC 25.06.1(a),- N/ A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) An application for a Permit to Dlill must be accompanied by each of the following itemS¡, exæpt for an item already on file wIth the commission and Identified in the application: (11) for a well dnlled from a/7 offshore platfol7n, mobile bottom-founded structure, jack-up rig, or floating dnlling vessel an analysis of seabed conditions as required by 20 MC 25.061(b); N/ A - Application is not for an offshore well. 12. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) An application for a Permit to Dnll must be accompanied by each of the following Items, except for a/7 Item already on file with the commission and identified in the application: (12) eVIdence showing that the requirements of 20 MC 25.025 {Bonding}have been met; Evidence of bonding for Phillips Alaska, Inc. is on file with the Commission. O R,: L" ,./~' r i~ .~...',. , ~'" I· . t ,~ : ~ ~ ~." ."1 "~I - .~~ 3S-20 PERMIT IT. DOC Page 50f6 Printed: 13-Jun-03 ) Ar"":'1ation for Permit to Drill, Well 3S-20 J Revision No.O Saved: 13-Jun-03 13. Proposed Drilling Program Requirements of 20 AAC 25.005 (c)(13) An application for a Permit to Drill mllst be aCLïJmpanied by each of the following item~ except for an item already on file with the commission and Identified in the application: The proposed drilling program is listed below. Please refer to Attachment 3, Well Schematic. 1. MIRU Nabors 7ES. 2. N/U riser (no diverter). 3. Drill 12-1/4" hole to 9-5/S" surface casing point according to directional plan. No LWD logging equipment required. Close approach issues mitigated by using gyro surveys. 4. Run and cement 9-5/S" 40#, L -SO BTC casing string to surface. Employ lightweight permafrost cement lead slurry and LiteCRETE tail slurry. Pump adequate excess to ensure cement reaches the surface. If cement does not circulate to surface, perform top job. Install and test BOPE as required on AOGCC approved permit to drill. Test casing to 2500 psi. 5. Drill out cement and 20' of new hole. Perform LOT. 6. Drill S-1/2" hole to total depth according to directional plan. Run LWD logging equipment with GR, resistivity, and density-neutron. Run 7" 26# L-SO BTCM casing to surface and cement. Note: If significant hydrocarbon zones are present above the Kuparuk C sand, sufficient cement will be pumped for isolation in accordance with 20 AAC 25.030(d)(3)(C). 7. Run 3-1/2" 9.3#, L-SO Srd EUE Srd-Mod completion assembly w/ SAB-3 permanent packer and PBR. Set packer 300' above top planned perforation, shear out of PBR, P/U tubing hanger, and land tubing. Pressure test tubing to 3500 psi. Pressure test 3 '12" x 7" annulus to 3500 psi. Burst shear valve for freeze protect. S. Set TWC and ND BOPE. Install and pressure test production tree. 9. Freeze protect. Secure well. Rig down and move out. 10. Handover well to Operations Personnel. 11. An SCMT will be run through tubing. 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) An application for a Pel7nit to Drill mustc be accompanied by each at the following Items, except for an item already on file with the commission and identified in the application: (14) a general description of how the operator plans to dispose at drilling mud and cuttlÌ7gS and a statement of whether the operator intend-; to request authorization under 20 AAC 25. 080 for an annular dispo!:Jöl operation in the well.; Waste fluids generated during the drilling process will be disposed of down a permitted annulus on 3S pad or hauled to a KRU Class II disposal well. All cuttings will be disposed of either down a permitted annulus on 3S pad or hauled to the Prudhoe Bay Field for temporary storage and eventual processing for injection down an approved disposal well. At the end of drilling operations, an application may be submitted to permit 3S-19 for annular pumping of fluids occurring as a result of future drilling operations on 3S pad. 15. Attachments Attachment 1 Directional Plan Attachment 2 Drilling Hazards Summary Attachment 3 Well Schematic. O ",,"c ':~" , t~ . I I,~' ~ " " , .: \ \t· ~ ~.. f \);,.~,~1 4) ..W 38-20 PERMIT IT. DOC Page 6 of 6 Printed: 13-Jun-03 C'4-~ ,; ConocoPhillips Ala In Western North S/fJ" , Aska Kuparuk River Unit (35-Pad) 35-20 (wp05) Sperry-Sun Drilling Services ~ C:J ~~···""i -' Re d: 20 May, 2003 Proposal Report . _~~~ ù tr~ 20 May, 2003 Your Ref: Target @ 5830' SSTVD Surface Coordinates: 5993869.45 N, 476071.76 E (70023'39.7678" N, 150011'40.8733" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 '---- Kelly Bushing: 55. 80ft above Mean Sea Level spe...,....y-5ul'1 DR~Ü;".ÇTNb(-7s··e-R\lXç'ìæs A Hatliburton Company Proposal Ref: pro2039 1200 - ;c: ~:~ !. 2400 - ...J.,..¡,:.J êC ~ f£ ..c õ. OJ o (ij <.J ~ 3600 - > [~'- 4800 - 8 ~ II ~ åi ãi 0 (J) 6000 - DrillQuest 3.03.02.004 ConocJPhillips ConocoPhillips Alaska, Inc. North Slope, Alaska Pal m (3S Pad) 38-20 (wp05) 0- '. ~:;I·iL. i2S·1T FHL z,l ,83' F'EL SEe 18 - T12N - R8Eì ~. . .'. Begin Dir @ 2.0"/10011 (in 12-1/4" Hole) : 200.00ft MD, 200.00ft ìVD ¡<pIP 1-:--- I ., I ncrease In Dlr Rate @ 4.0"/1000 : 700.000 MD, 697.47ft TVD ! I End Dir, Start Sail @ 66.8": 2131.14ft MD, 1774.8ftTVD / 9-518" Csg pt. 4258.00' MD 2611.44' TVD 9-5/8" Csg PI ... Drill out 8-1/2' Hole: 4258.0 ft MD, 2611.44ft TVD spel'l'y-sur) DRIL-LING" ~Se·R'ln;·~·s A Halliburton Company o I 1200 I 3600 I 2400 Scale: 1inch = 12001I TARGET P60: Hadius"¡ : ~2581.B5!i MD, S385 SQft"TVD 5847.18 S. 3652.77 ~V c-f SHL ~ 24" FWL. SK '''-NN-me¡ "-... Ld$>9" ~ - ~ 7" Csg Pt. Total Depth: 12900.00ft MD, 6010.95ftTVD ________~ 12900.00' MD (1896' FSL & 6' FWL, See 24-T12N-R7E) 6010.95' TVD I I I 8400 9600 10800 Scale: 1 inch = 2000ft Eastings -4000 I -2000 I -1 ??oo I -8000 I -6000 I -2000 - o - ~----- - --~--_..- ... -----~.. S~L (l~54r FNL & 1 H~e: ~EL: Sf~C 18... T12N... -- ------ ~- .~~-----_# - ._-~--_.. ~ --.-.----- - _.~--~. Increase in Dir Rate @ 4.0°/1000: 700.001I MD. 697.47ft End Dir, Start Sail @ 66.80: 2131.14ft MD, 1774.8ft 9-518" Csg Pt... Drill out 8-1/2" Hole: 4258.0 ft MD, 2611.44ft TVD -4000 - TARGET (150' RacEus) : 1258185ft t/D, 5885.80ft T"ED 594718 S, 8652.77 W of SHL (2061' FSL & 248' FWL, Sec. 24-T12N-R7E) 7" Csg Pt. 12900.00' MD 6010.95' TVD .~ .....\.j,,'..'. ~'T~ Reference is True North -6000 - Total Depth: 12900.00ft MD, 6010.95ftTVD (1896' FSL & 6' FWL, See 24- T12N-R7E) I -1 ??oo I -8000 I -6000 I -4000 I -2000 4Þþ ~d> ~O~ ~d> ~b Þ ~I) Current Well Properties 3S-20 We.: Horizontal Coordinates: Ref. Global Coordinates: Ref. Project H Reference: Ref. Geographical Coordinates: 5993869.45 N, 476071.76 E 993787.77 N. 27109.42 W 70° 23' 39.7678" N, 209048' 19.1267" E 2547' FNL & 1188' FEl, See 18 -T12N- R8E RKB Elevation: North Reference: Units : 55.80ft above Mean Sea level True North Feet (US) I 4800 I 6000 I 7200 o I o - -2000 (J) en c: :E t:: o Z --4000 -' õ o o - -6000 c;: .s::: o c: åi ~ (J) o r ConocoPhillips Alaska, Inc. 38-20 (wp05) MD Inc Azim. SSTVD TVD NIS E/W y X DLS V.S. Comment (ft) (Deg) (Deg) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) (ft) --~¡ 0.00 0.00 0.00 -55.80 0.00 0.00 N 0.00 E 5993869,45 N 476071.76 E 0.00 0.00 SHL. 200.00 0.00 0.00 144.20 200.00 0.00 N 0.00 E 5993869.45 N 476071.76 E 0.00 0.00 Begin Dir @ 2.00/100ft (in 12-1/4" Hole) 700.00 10.00 220.00 641.67 697.47 33.34 S 27.98 W 5993836.20 N 476043.68 E 2.00 42.04 Increase in Dir Rate @ 4.00/100ft 1695.63 49.45 234.50 1490.00 1545.80 331.32 S 406.85 W 5993539.44 N 475663.85 E 4.00 523.31 8. Permafrost r:f~ 2131.14 66.84 235.76 1719.00 1774.80 541.66 S 709.39 W 5993330.07 N 475360.64 E 4.00 891.78 End Dir; Start Sail .~~. -:"-;---11 2731.09 66.84 235.76 1955.00 2010.80 851.97 S 1165.40 W 5993021.21 N 474903.64 E 0.00 1443.31 Top W. Sak r< ':J 3862.34 66.84 235.76 2400.00 2455.80 1437.10 S 2025.24 W 5992438.84 N 474041.93 E 0.00 2483.27 Base W.Sak 4258.00 66.84 235.76 2555.64 2611.44 1641.75 S 2325.97 W 5992235.15 N 473740.54 E 0.00 2847.00 9-5/8" Csg pt ... Drill out 8-1/2" Hole 4358.06 66.84 235.76 2595.00 2650.80 1693.50 S 2402.02 W 5992183.64 N 473664.33 E 0.00 2938.98 Top C-80 8018.73 66.84 235.76 4035.00 4090.80 3586.95 S 5184.43 W 5990299.12 N 470875.88 E 0.00 6304.22 Top C-40 10815.07 66.84 235.76 5135.00 5190.80 5033.33 S 7309.87 W 5988859.54 N 468745.81 E 0.00 8874.90 Top Moraine 11646.35 66.84 235.76 5462.00 5517.80 5463.30 S 7941.71 W 5988431.60 N 468112.60 E 0.00 9639.09 Top HRZ T"--~-'-~~;¡I 12142.06 66.84 235.76 5657.00 5712.80 5719.70 S 8318.50 W 5988176.40 N 467735.00 E 0.00 10094.80 Base HRZ 12429.32 66.84 235.76 5770.00 5825.80 5868.29 S 8536.84 W 5988028.52 N 467516.18 E 0.00 10358.88 K1 12581.85 66.84 235.76 5830.00 5885.80 5947.18 S 8652.77 W 5987950.00 N 467400.00 E 0.00 10499.10 Target 12630.15 66.84 235.76 5849.00 5904.80 5972.16 S 8689.48 W 5987925.13 N 467363.21 E 0.00 10543.50 Base Kuparuk 12900.00 66.84 235.76 5955.15 6010.95 6111.74 S 8894.59 W 5987786.21 N 467157.65 E 0.00 10791.57 Total Depth i- Sperry-Sun Drilling Services Proposal Data - 35-20 Plan - 35-20 (wp05) ____I ~~ 1 ¡ o.ooi ----+----~- t-- 2 i ~gO.OO: 200.00 3 i 700.00; SOO.OO 4 2131.14 1431.14 5T 12581.85 10450.71 re-' 12900.00 318.15 Delta MD (ft) Inclin. (0) 0.000; O.OOO¡ 10.000: 66.836 66.836 66.836' Azimuth i (0) I O.OOO! o.oool 220.000 ! 235.764 235.764 235.764: TVD ! Northings (ft) ì (ft) . 0.001 O.OOj 200.001 0.001 697.47 33.34 S¡ 1774.80 541.65 S 5885.80 5947.18 S 6010.95; 6111.74S· Eastings I Dogleg ¡ TooIface VS (235°) (ft) ¡ (°/1 00ft) I (0) _ _ _ (~)__ 0.00:' 0.00 j ¡.----- o.ooi 0.000: 0.000 0.00 i I 27.98 wi 2.000j 220.000 42.04 709.39 W 4.000 17.278 891.78 8652.77 W 0.000 0.000 10499.10 , . 8894.59 W' 0.000; 0.000; 10791.57! -- :ç"" -.c.:-.!Q;.;.¿J I ¡ MD Delta Inclin. ' Azimuth TVD Northings Eastings Dogleg Too1face VS (235°) ¡ (ft) M D (ft) (0) CO) (ft) (ft) (ft) (°/1000) (0) (ft) ¡ __-;:J 1 0.00 0.000 0.000 -55.80 5993869.45 N 476071 .76 E 0.001 I ..,;".::-"--~ 2 200.00 200.00 0.000 0.000 144.20 5993869.45 N 476071.76 E 0.000 0.000 0.001 " 3 700.00 500.00 10.000 220.183, 641.67 5993836.20 N 476043.68 E 2.000 220.183 42.04j 4 2131.14 1431.14 66.836 235.948 1719.00 5993330.07 N 475360.64 E 4.000 17.278 891.78! 5T 12581.85 10450.71 66.836 235.948 5830.00 5987950.00 N 467400.00 E 0.000 0.000 10499.10! L_6 12900.001 318.15: 66.8361 235.948 ; 5955.15: 5987786.21 N! 467157.65 EI 0.000; 0.000 10791.57: -' 20 May, 2003 - 9:25 - 1 - DrillQuest DrillQuest 3.03.02.002 Page 2 of 10 20 May, 2003 - 9:53 Sperry-Sun Drilling Services Proposal Report for 35-20 Plan - 35-20 (wp05) Your Ref: Target @ 5830' SSTVD Revised: 20 May, 2003 ConocoPhillips Western North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Easting!i¡¡¡¡ Ràœ Section Comment (ft) (ft) (ft) (ft) (ft) (ft) 0.00 0.000 0.000 -55.80 0.00 0.00 N 0.00 E 5993869.45 N 476tlÆJ¡t¡i76'E" 0.00 SHL (2547' FNL & 1188' FEL, Sec 18 T12N - R8E) 100.00 0.000 0.000 44.20 100.00 O.OON 0.00 E 5993869.45 N \1;11,9071.76 E 0.000 0.00 200.00 0.000 0.000 144.20 200.00 0.00 N 0.00 E 5993869.45 N 476071.76 E 0.000 0.00 Begin Dir @ 2.00/100ft (in 12-114" HolE : 200.00ft MD, 200.00ft TVD 300.00 2.000 220.000 244.18 299.98 1.34S 1:12W 5993868.12 N 476070.63 E 2.000 1.69 ~~ 400.00 4.000 220.000 344.04 399.84 5.35S 4.49W 5993864.12 N 476067.26 E 2.000 6.74 500.00 6.000 220.000 443.65 499.45 10.09 W} 5993857.46 N 476061.63 E 2.000 15.16 'Q 600.00 8.000 220.000 542.90 598.70 17 .92 W 5993848.15 N 476053.77 E 2.000 26.93 700.00 10.000 220.000 641 .67 697.47 27.98 W 5993836.20 N 476043.68 E 2.000 42.04 Increase in Dir Rate @ 4.0°/1000 : .:1.:1 700.00ft MD, 697.47ft TVD ~ 800.00 13.870 224.958 739.49 795.29 42.03 W 5993821.11 N 476029.57 E 4.000 62.24 '" 900.00 17.797 227.773 835.68 891.48 61 .82 W 5993802.41 N 476009.72 E 4.000 89.21 r.~··"1 ...-...... -..:-' ~~ -J. 1000.00 21.749 229.593 929.76 985.56 89.53 S 87.26 W 5993780.20 N 475984.21 E 4.000 122.83 .'" 1100.00 25.716 230.875 1021.29 1077.09 115.24 S 118.21 W 5993754.59 N 475953.18 E 4.000 162.93 i:::::.a. 1200.00 29.691 231.834 1109.81 1165.61 144.25 S 154.53 W 5993725.70 N 475916.77 E 4.000 209.32 1300.00 33.672 232.585 J 194.89 1250.69 176.41 S 196.04 W 5993693.67 N 475875.16 E 4.000 261.76 If--- 1400.00 37.656 233·193' '1276. Ú! 1331.92 211.56 S 242.53 W 5993658.66 N 475828.55 E 4.000 320.02 1500.00 41 .643 .., 233.701 '<.1 1353.10 1408.90 249.55 S 293.78 W 5993620.84 N 475777.18 E 4.000 383.79 1600.00 45.632, 234.135 1425.45 1481.25 290.18 S 349.55 W 5993580.39 N 475721.28 E 4.000 452.77 1695.63 49.448 .. 234.498 1490.00 1545.80 331.32 S 406.85 W 5993539.44 N 475663.85 E 4.000 523.31 B. Permafrost 1700.00 49.622\234.513 1492.84 1548.64 333.25 S 409.56 W 5993537.52 N 475661.14 E 4.000 526.63 1800.00 53.614 ..234.850 1554.91 1610.71 378.55 S 473.51 W 5993492.42 N 475597.04 E 4.000 605.00 1900.00 . 57.606 235.153 1611.39 1667.19 425.87 S 541.09 W 5993445.32 N 475529.31 E 4.000 687.51 ~ 2000.00 61.599 235.430 1661 .98 1717.78 474.97 S 611 .99 W 5993396.45 N 475458.25 E 4.000 773.74 2100.00 65.592 235.688 1706.44 1762.24 525.61 S 685.84 W 5993346.04 N 475384.24 E 4.000 863.29 2131.14 66.836 235.764 1719.00 1774.80 541.65 S 709.39 W 5993330.07 N 475360.64 E 4.000 891.78 End Dir, Start Sail @ 66.8° : 2131.14ft MD, 1774.8ft TVD 2200.00 66.836 235.764 1746.08 1801 .88 577.27 S 761.73 W 5993294.62 N 475308.19 E 0.000 955.08 2300.00 66.836 235.764 1785.42 1841.22 629.00 S 837.74 W 5993243.14 N 475232.02 E 0.000 1047.01 2400.00 66.836 235.764 1824.76 1880.56 680.72 S 913.74 W 5993191.66 N 475155.84 E 0.000 1138.94 2500.00 66.836 235.764 1864.10 1919.90 732.44 S 989.75 W 5993140.18 N 475079.67 E 0.000 1230.87 2600.00 66.836 235.764 1903.43 1959.23 784.17 S 1065.76 W 5993088.70 N 475003.50 E 0.000 1322.80 2700.00 66.836 235.764 1942.77 1998.57 835.89 S 1141.77W 5993037.22 N 474927.32 E 0.000 1414.73 DrillQuest 3.03.02.002 Page 3 of 10 20 May, 2003 - 9:53 Sperry-Sun Drilling Services Proposal Report for 35-20 Plan - 35-20 (wp05) Your Ref: Target @ 5830' SSTVD Revised: 20 May, 2003 ConocoPhillips Western North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Easting$1!!; Rcim Section Comment (ft) (ft) (ft) (ft) (ft) (ft) 2731.09 66.836 235.764 1955.00 2010.80 851.97 S 1165.40 W 5993021.21 N '?i. 474~ª§º4;E" \0:000 1443.31 Top W. 8ak 2800.00 66.836 235.764 1 982.11 2037.91 887.62 S 1217.78 W 5992985.74 N\/,~¡~748Š1f¡15 E 0.000 1506.66 2900.00 66.836 235.764 2021.44 2077.24 939.34 S 1293.78 W 5992934.26 N ;ji~i\t774.98 E 0.000 1598.59 3000.00 66.836 235.764 2060.78 2116.58 991.06 S 1369.79 W 5992882.78 N 414tii98.80 E 0.000 1690.52 3100.00 66.836 235.764 2100.12 2155.92 1042.79 8 1445¡BO W.;",,,5S92831.3QN 474622.63 E 0.000 1782.45 -';::y:.- .~ 3200.00 66.836 235.764 2139.46 2195.26 1094.51 S !';,.P2779.82 N 474546.46 E 0.000 1874.38 3300.00 66.836 235.764 2178.79 2234.59 1146.248 '\;1';115992728.33 N 474470.28 E 0.000 1966.31 3400.00 66.836 235.764 2218.13 2273.93 1 t~jjt96 S 5992676.85 N 474394.11 E 0.000 2058.24 3500.00 66.836 235.764 2257.47 2313.27 124~iº8 S 5992625.37 N 474317.94 E 0.000 2150.17 3600.00 66.836 235.764 2296.80 2352.60 1301.41 8 5992573.89 N 474241.76 E 0.000 2242.10 ".......~ -" ......... 3700.00 66.836 235.764 2336.14 2391 .94 1353.13 S 1901.85 W 5992522.41 N 474165.59 E 0.000 2334.03 c-'..;-:-..-:.Lr-...-$ 3800.00 66.836 235.764 2375.48 2431.28 1404.86 8 1977.86 W 5992470.93 N 474089.42 E 0.000 2425.96 1 3862.34 66.836 235.764 2400.00 2455.80 1437.108 2025.24 W 5992438.84 N 474041.93 E 0.000 2483.27 Base W.8ak 3900.00 66.836 235.764 2414.81 . 2470.61 1456.58 S 2053.86 W 5992419.45 N 474013.24 E 0.000 2517.89 4000.00 66.836 235.764 2454.15 2509.95 1508.30 8 2129.87 W 5992367.97 N 473937.07 E 0.000 2609.82 4100.00 66.836 235.764 2493.49 2549.29 1560.03 S 2205.88 W 5992316.49 N 473860.90 E 0.000 2701 .75 4200.00 66.836 235.764 '2532.83 2588.63 1611.758 2281.89 W 5992265.01 N 473784.72 E 0.000 2793.68 4258.00 66.836 235;764 ....., 2555.64 2611.44 1641.75 S 2325.97 W 5992235.15 N 473740.54 E 0.000 2847.00 9-5/8" Csg Pt ... Drill out 8-1/2" Hole: if -~ ~--:J.... .~_:~ 4258.0 ft MD, 2611.44ft TVD 9 5/8in Casing 4300.00 §6 .836 . 235.764 2572.16 2627.96 1663.48 8 2357.90 W 5992213.53 N 473708.55 E 0.000 2885.61 4358.06 . 66.836 235.764; 2595.00 2650.80 1693.50 S 2402.02 W 5992183.64 N 473664.33 E 0.000 2938.98 Top C-80 4400.00 66.836 '235.764 2611.50 2667.30 1715.208 2433.90 W 5992162.05 N 473632.38 E 0.000 2977.54 4500.00··· 66.836 235.764 2650.84 2706.64 1766.92 S 2509.91 W 5992110.57 N 473556.20 E 0.000 3069.47 '-" 4600.00 66.836 235.764 2690.17 2745.97 1818.65 S 2585.92 W 5992059.09 N 473480.03 E 0.000 3161.40 4700.00 66.836 235.764 2729.51 2785.31 1870.37 S 2661 .93 W 5992007.61 N 473403.86 E 0.000 3253.33 4800.00 66.836 235.764 2768.85 2824.65 1922.108 2737.94 W 5991956.13 N 473327.68 E 0.000 3345.26 4900.00 66.836 235.764 2808.19 2863.99 1973.82 S 2813.94 W 5991 904.65 N 473251.51 E 0.000 3437.19 5000.00 66.836 235.764 2847.52 2903.32 2025.54 8 2889.95 W 5991853.17 N 473175.34 E 0.000 3529.11 5100.00 66.836 235.764 2886.86 2942.66 2077.27 8 2965.96 W 5991801.69 N 473099.16 E 0.000 3621 .04 5200.00 66.836 235.764 2926.20 2982.00 2128.998 3041.97 W 5991750.21 N 473022.99 E 0.000 3712.97 5300.00 66.836 235.764 2965.53 3021 .33 2180.72 S 3117.98 W 5991698.73 N 472946.82 E 0.000 3804.90 DrillQuest 3.03.02.002 Page 4 of 10 20 May, 2003 - 9:53 Sperry-Sun Drilling Services Proposal Report for 3S-20 Plan - 3S-20 (wp05) Your Ref: Target @ 5830' SSTVD Revised: 20 May, 2003 ConocoPhillips Western North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastinaš!¡ RàfS Section Comment (ft) (ft) (ft) (ft) (ft) (ft) 5400.00 66.836 235.764 3004.87 3060.67 2232.44 8 3193.99 W 5991647.25 N 3896.83 5500.00 66.836 235.764 3044.21 3100.01 2284.168 3269.99 W 5991 5~9}7 N 0.000 3988.76 5600.00 66.836 235.764 3083.54 3139.34 2335.89 8 3346.00 W 59J~1;~4ß N 0.000 4080.69 5700.00 66.836 235.764 3122.88 3178.68 2387.61 S 3422.01 W;;.;.~ª,J:t92:'¡,,!'J 0.000 4172.62 5800.00 66.836 235.764 3162.22 3218.02 2439.34 8 WÆ¡;¥¡¡;!~;9~,~~ .32jN 0.000 4264.55 5900.00 66.836 235.764 3201 .56 3257.36 2491 .06 S ~"!Luu~1389.84 N 472489.78 E 0.000 4356.48 - 6000.00 66.836 235.764 3240.89 3296.69 2542.78 8 \¡¡¡¡¡i!5991338.36 N 472413.61 E 0.000 4448.41 6100.00 66.836 235.764 3280.23 3336.03 25ª~~51 8 5991286.88 N 472337.43 E 0.000 4540.34 t:::> 6200.00 66.836 235.764 3319.57 3375.37 264ììi23 8 5991235.40 N 472261.26 E 0.000 4632.27 6300.00 66.836 235.764 3358.90 3414.70 2697.96 S 5991183.92 N 472185.09 E 0.000 4724.20 ::r-, -='- 6400.00 66.836 235.764 3398.24 3454.04 2749.688 3954.07 W 5991132.44 N 472108.91 E 0.000 4816.13 ~~ 6500.00 66.836 235.764 3437.58 3493.38 2801 .40 8 4030.07 W 5991080.96 N 472032.74 E 0.000 4908.06 -" ..~ 6600.00 66.836 235.764 3476.92 3532.72 2853.138 4106.08 W 5991029.48 N 471956.57 E 0.000 4999.99 6700.00 66.836 235.764 3516.25 3572.05 2904.85 S 4182.09 W 5990978.00 N 471880.39 E 0.000 5091 .92 .~ 6800.00 66.836 235.764 3555.59 3611.39 2956.58 S 4258.10 W 5990926.52 N 471804.22 E 0.000 5183.85 ~.'~ .,-~ 6900.00 66.836 235.764, 3594.93 3650.73 3008.30 S 4334.11 W 5990875.04 N 471728.05 E 0.000 5275.78 ~.,------- co 7000.00 66.836 23:5.764.:36.;34.26 3690.06 3060.02 8 4410.11 W 5990823.56 N 471651.87 E 0.000 5367.71 7100.00 66.836 235,764 \ 3673.60 3729.40 3111.758 4486.12 W 5990772.08 N 471575.70 E 0.000 5459.64 7200.00 66.836 ; 235.764 'Ji- 3712.94 3768.74 3163.47 S 4562.13 W 5990720.60 N 471499.53 E 0.000 5551 .57 7300.00 66.836 ' 235.764 3752.27 3808.07 3215.20 S 4638.14 W 5990669.12 N 471423.35 E 0.000 5643.50 7400.00 66.836 235.764 3791 .61 3847.41 3266.92 8 4714.15 W 5990617.64 N 471347.18 E 0.000 5735.43 7500.00 66:836 .'235.764 3830.95 3886.75 3318.64 S 4790.15 W 5990566.16 N 471271.01 E 0.000 5827.36 7600.00 66.836 235.764 3870.29 3926.09 3370.37 8 4866.16 W 5990514.68 N 471194.83 E 0.000 5919.29 7700.00 66.836 235.764 3909.62 3965.42 3422.09 8 4942.17 W 5990463.20 N 471118.66 E 0.000 6011.22 7800.00 66.836 235.764 3948.96 4004.76 3473.82 S 5018.18W 5990411.72 N 471042.49 E 0.000 6103.15 7900.00 66.836 235.764 3988.30 4044.10 3525.54 S 5094.19 W 5990360.23 N 470966.31 E 0.000 6195.08 8000.00 66.836 235.764 4027.63 4083.43 3577.26 8 5170.19 W 5990308.75 N 470890.14 E 0.000 6287.01 8018.72 66.836 235.764 4035.00 4090.80 3586.95 8 5184.43 W 5990299.11 N 470875.88 E 0.000 6304.22 Top C-40 8100.00 66.836 235.764 4066.97 4122.77 3628.99 S 5246.20 W 5990257.27 N 470813.97 E 0.000 6378.94 8200.00 66.836 235.764 4106.31 4162.11 3680.71 S 5322.21 W 5990205.79 N 470737.80 E 0.000 6470.87 DrillQuest 3.03.02.002 Page 5 of 10 20 May, 2003 - 9:53 Sperry-Sun Drilling Services Proposal Report for 3S-20 Plan - 3S-20 (wp05) Your Ref: Target @ 5830' SSTVD Revised: 20 May, 2003 ConocoPhillips Western North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastjngs¡¡; R~ti' Section Comment (ft) (ft) (ft) (ft) (ft) (ft) 8300.00 66.836 235.764 4145.65 4201 .45 3732.44 S 5398.22 W 5990154.31 N i¡IIJ1¡, 47~ø,I~2EP "':0:000 6562.80 8400.00 66.836 235.764 4184.98 4240.78 3784.16 S 5474.23 W 59901 Qg,83 N \;1¡!¡i~705a5'i45 E 0.000 6654.73 8500.00 66.836 235.764 4224.32 4280.12 3835.88 S 5550.23 W 5990051.35 N Vcl:1Q509.28 E 0.000 6746.66 8600.00 66.836 235.764 4263.66 4319.46 3887.61 S 5626.24 W 5989999.87 N 41Ø4a3.10 E 0.000 6838.59 8700.00 66.836 235.764 4302.99 4358.79 3939.33 S 5702;25 W",,;!~8Q~~c8.~,N 470356.93 E 0.000 6930.52 8800.00 66.836 235.764 4342.33 4398.13 3991 .06 S 5989896.91 N 470280.76 E 0.000 7022.45 --'" 8900.00 66.836 235.764 4381.67 4437.47 4042.78 S 5989845.43 N 470204.58 E 0.000 7114.38 9000.00 66.836 235.764 4421 .00 4476.80 40~4.50 S 5989793.95 N 470128.41 E 0.000 7206.31 9100.00 66.836 235.764 4460.34 4516.14 414i~3 S 5989742.47 N 470052.24 E 0.000 7298.24 ;tJ 9200.00 66.836 235.764 4499.68 4555.48 4197.95 S 5989690.99 N 469976.06 E 0.000 7390.17 -..a!Ir."Y,.o¡;. .1 9300.00 66.836 235.764 4539.02 4594.82 4249.68 S 6158.30 W 5989639.51 N 469899.89 E 0.000 7482.10 9400.00 66.836 235.764 4578.35 4634.15 4301.40 S 6234.31 W 5989588.03 N 469823.72 E 0.000 7574.03 " 9500.00 66.836 235.764 4617.69 /;4673.49 4353.12 S 6310.32 W 5989536.55 N 469747.54 E 0.000 7665.96 " 9600.00 66.836 235.764 4657 .03;;, 4~¡¡£i~ 4404.85 S 6386.32 W 5989485.07 N 469671 .37 E 0.000 7757.89 9700.00 66.836 235.764 ,:~:~:~6 <>;!¡ ;75~,~~;ß 4456.57 S 6462.33 W 5989433.59 N 469595.20 E 0.000 7849.82 '"- '0'-·-··'..·· -'-0-0"'-'"'"'"-' -. :;"'-"",.- 9800.00 66.836 235.764 ~735;'žg?,:;>;; 4791.50 4508.30 S 6538.34 W 5989382.11 N 469519.02 E 0.000 7941.75 .;..-~ ri~ 9900.00 66.836 235.764 4775.04" 4830.84 4560.02 S 6614.35 W 5989330.63 N 469442.85 E 0.000 8033.68 I ~ 10000.00 66.836 235.764 ',.,- 4814.38 4870.18 4611.74 S 6690.36 W 5989279.15 N 469366.68 E 0.000 8125.61 10100.00 66.836 235:764 .. .... 4853.71 4909.51 4663.47 S 6766.36 W 5989227.67 N 469290.50 E 0.000 8217.54 10200.00 66.836 235.764' ' 4893.05 4948.85 4715.19 S 6842.37 W 5989176.18 N 469214.33 E 0.000 8309.47 10300.00 ~.836 235.764 4932.39 4988.19 4766.92 S 6918.38 W 5989124.70 N 469138.16 E 0.000 8401.39 10400.00 66.836 ,235.764 4971.72 5027.52 4818.64 S 6994.39 W 5989073.22 N 469061.98 E 0.000 8493.32 10500.00 66.836 235.764 5011 .06 5066.86 4870.36 S 7070.40 W 5989021.74 N 468985.81 E 0.000 8585.25 10600.00 . 66.836 235.764 5050.40 5106.20 4922.09 S 7146.40 W 5988970.26 N 468909.64 E 0.000 8677.18 --- 10700.00 66.836 235.764 5089.73 5145.53 4973.81 S 7222.41 W 5988918.78 N 468833.46 E 0.000 8769.11 10800.00 66.836 235.764 5129.07 5184.87 5025.54 S 7298.42 W 5988867.30 N 468757.29 E 0.000 8861.04 10815.07 66.836 235.764 5135.00 5190.80 5033.33 S 7309.87 W 5988859.54 N 468745.81 E 0.000 8874.90 Top Moraine 10900.00 66.836 235.764 5168.41 5224.21 5077.26 S 7374.43 W 5988815.82 N 468681.12 E 0.000 8952.97 11000.00 66.836 235.764 5207.75 5263.55 5128.98 S 7450.44 W 5988764.34 N 468604.94 E 0.000 9044.90 11100.00 66.836 235.764 5247.08 5302.88 5180.71 S 7526.44 W 5988712.86 N 468528.77 E 0.000 9136.83 DrillQuest 3.03.02.002 Page 6 of 10 20 May, 2003 - 9:53 Sperry-Sun Drilling Services Proposal Report for 35-20 Plan - 35-20 (wp05) Your Ref: Target @ 5830' SSTVD Revised: 20 May, 2003 ConocoPhillips Western North Slope Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastlng$;ii Reitii Section Comment (ft) (ft) (ft) (ft) (ft) (ft) 11200.00 66.836 235.764 5286.42 5342.22 5232.43 S 7602.45 W 5988661.38 N ~;i;;~;;46g~l¡tiO'E7 ':0:000 9228.76 11300.00 66.836 235.764 5325.76 5381.56 5284.16 S 7678.46 W 5988609.90 N ':;;~~6831ß~43 E 0.000 9320.69 11400.00 66.836 235.764 5365.09 5420.89 5335.88 S 7754.47 W 5988558.42 N \¡.~300.25 E 0.000 9412.62 11500.00 66.836 235.764 5404.43 5460.23 5387.60 S 7830.48 W 5988506.94 N 4a~4.08 E 0.000 9504.55 11600.00 66.836 235.764 5443.77 5499.57 5439.33 8 79Qô¡48 W"".5988455.46,N 468147.91 E 0.000 9596.48 -- 11646.35 66.836 235.764 5462.00 5517.80 5463.30 S {:@L_8431.60 N 468112.60 E 0.000 9639.09 Top H RZ 11700.00 66.836 235.764 5483.11 5538.91 5491.05 S t¡i8!il¡:5988403.98 N 468071.73 E 0.000 9688.41 11800.00 66.836 235.764 5522.44 5578.24 5542.78 S 5988352.50 N 467995.56 E 0.000 9780.34 11900.00 66.836 235.764 5561.78 5617.58 559~iO S 5988301.02 N 467919.39 E 0.000 9872.27 12000.00 66.836 235.764 5601.12 5656.92 5ø6'~ 8 5988249.54 N 467843.21 E 0.000 9964.20 '0 5697.951;$" ':n 12100.00 66.836 235.764 5640.45 5696.25 8286.52 W 5988198.06 N 467767.04 E 0.000 10056.13 12142.06 66.836 235.764 5657.00 5712.80 5719.70 S 8318.50 W 5988176.40 N 467735.00 E 0.000 10094.80 Base H RZ "':'::"'~:. 12200.00 66.836 235.764 5679.79 5735.59 5749.678 8362.53 W 5988146.58 N 467690.87 E 0.000 10148.06 ~ )) 12300.00 66.836 235.764 5719.13 5774.93 5801 .40 S 8438.54 W 5988095.10 N 467614.69 E 0.000 10239.99 12400.00 66.836 235.764 5758.47 581427 5853.12 S 8514.55 W 5988043.62 N 467538.52 E 0.000 10331.92 12429.32 66.836 235.764 5770.00 5825.80 5868.29 8 8536.84 W 5988028.52 N 467516.18 E 0.000 10358.88 K1 ''':".':;J. 12500.00 66.836 235,764 '57:97.80'» 5853.60 5904.84 S 8590.56 W 5987992.13 N 467462.35 E 0.000 10423.85 ;- 12581.85 66.836 235.764 SaSO.OO 5885.80 5947.18 S 8652.77 W 5987950.00 N 467400.00 E 0.000 10499.10 Target: 12581.85ft MD, 5885.8Oft TVI (2061' F8L & 248' FWL, 8ec. 24-T12t R7E) Top Kuparuk Target - 38-20, 150.00 Radius., Geological 12600.00 . 66.836 235.764 5837.14 5892.94 5956.57 8 8666.56 W 5987940.65 N 467386.17 E 0.000 10515.78 12630.15 66.836 235.764 5849.00 5904.80 5972.16 S 8689.48 W 5987925.13 N 467363.21 E 0.000 10543.50 Base Kuparuk -" 12700.00 66.836 235.764 5876.48 5932.28 6008.29 8 8742.57 W 5987889.17 N 467310.00 E 0.000 10607.71 12800.00 66.836 235.764 5915.81 5971.61 6060.02 8 8818.58 W 5987837.69 N 467233.83 E 0.000 10699.64 12900.00 66.836 235.764 5955.15 6010.95 6111.748 8894.59 W 5987786.21 N 467157.65 E 0.000 10791.57 Total Depth: 12900.00ft MD, 601 O. 95ftTV 0 (1896' F8L & 6' FWL, Sec 24-T12N-R7E) 7in Casing :~: --....... "'---.lJ ;:7'"1 .. --~ ~~~~ Western North Slope Sperry-Sun Drilling Services Proposal Report for 35-20 Plan - 35-20 (wp05) Your Ref: Target @ 5830' 55TVD Revised: 20 May, 2003 ConocoPhillips All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to 3S-20. Northings and Eastings are relative to 3S-20. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from 3S-20 and calculated along an Azimuth of 235.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12900.00ft., The Bottom Hole Displacement is 10791.9911., in the Direction of 235.506° (True). ---' The Along Hole Displacement is 10795.27ft, the Planned Tortuosity is 0.981 °/1 oatt and,P1e Directional Difficulty Index is 6.0. Comments Measured Depth (ft) 0.00 200.00 700.00 2131.14 4258.00 12581.85 12900.00 20 May, 2003 - 9:53 Station Coordina TVD Northings (ft) (ft) 0.00 200.00 697 .47 /~; 1774.80 2611.44 p885.80 6010.95 5947.18 S 6111.74S 0.00 E 0.00 E 27.98 W 709.39 W 2325.97 W SHL (2547' FNL & 1188' FEL, Sec 18 - T12N - R8E) Begin Dir @ 2.00/100ft (in 12-1/4" Hole) : 200.00ft MD, 200.00ft TVD Increase in Dir Rate @ 4.00/100ft : 700.00ft MD, 697.47ft TVD End Dir, Start Sail @ 66.8° : 2131.14ft MD, 1774.8ft TVD 9-5/8" Csg Pt ... Drill out 8-1/2" Hole: 4258.0 ft MD, 2611.44ft TVD Target: 12581.85ft MD, 5885.80ft TVD (2061' FSL & 248' FWL, Sec. 24-T12N-R7E) Total Depth: 12900.00ft MD, 6010.95ftTVD (1896' FSL & 6' FWL, Sec 24-T12N-R7E) 8652.77 W 8894.59 W -,,' Page 7 of 10 DrillQuest 3.03.02.002 DrillQuest 3.03.02.002 - 1490.00 0.000 359.817 1695.63 1545.80 1955.00 0.000 359.817 2731.09 2010.80 2400.00 0.000 359.817 3862.34 2455.80 2595.00 0.000 359.817 4358.06 2650.80 4035.00 0.000 359.817 8018.72 4090.80 5135.00 0.000 359.817 10815.07 5190.80 5033.33 S 5462.00 0.000 359.817 11646.35 5517.80 5463.30 S 5657.00 0.000 359.817 12142.06 5712.80 5719.70 S 5770.00 0.000 359.817 12429.32 5825.80 5868.29 S 5830.00 0.000 359.817 12581.85 5885.80 5947.18 S 5849.00 0.000 359.817 12630.15 5904.80 5849.00 5972.16 S Casinø details t=f 0 m To Measured Vertical Measured Vertical Depth Depth Depth Depth Casing Detail (ft) (ft) (ft) (ft) <Surface> <Surface> 4258.00 2611.44 9 5/8in Casing 4251.21 2608.77 <Run-TO> <Run-TO> 7in Casing Page 8 of 10 8689.48 W Base Kuparuk 7309.87 W Top Moraine 7941.71 W Top HRZ 8318.50 W Base HRZ 8536.84 W K1 8652.77 W Top Kuparuk -- ConocoPhillips B. Permafrost Top W. Sak Base W.Sak Top C-80 Top C-40 Penetration Point Sub-Sea Depth Northings (ft) (ft) Sperry-Sun Drilling Services Proposal Report for 35-20 Plan - 35-20 (wp05) Your Ref: Target @ 5830' SSTVD Revised: 20 May, 2003 20 May, 2003 - 9:53 \~-~.....~.....- -" ,-~::) Profile Measured Vertical Depth Depth (ft) (ft) Formati on Plane (Below Well Origin) Sub-Sea Dip Up-Dip (ft) Angle Dirn. Formation Tops Western North Slope Sperry-Sun Drilling Services Proposal Report for 35-20 Plan - 35-20 (wp05) Your Ref: Target @ 5830' SSTVD Revised: 20 May, 2003 Western North Slope TarQets associated with this wel//Jath Target Name 38-20 Targe TJl:Q (ft) ConocoPhillips ate s Eastings (ft) Target Target Shape Type Circle Geological -- 5885.80 5947.18 S 8652.77 W 5830.00 5987950.00 N 467400.00 E 700 22' 41 .2232" N 1500 15' 54.1163" W Mean Sea Level/Global Coordinates: Geographical Coordinates: Target Radius: -"t "___...r./ -- 20 May, 2003 - 9:53 150.00ft ~J Page 9 of 10 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services North Reference 5heet for Kuparuk 35 Pad - 35-20 Plan Western North Slope Coordinate System is NAD27 Alaska State Planes, Zone 4, US Foot Source: Snyder, J.P., 1987, Map Projections - A Working Manual Projection method is Transverse Mercator or Gauss Kruger Projection Central Meridian is -150.000° Longitude Origin: 0.000° Latitude Origin: 54.000° False Easting: 500,OOO.000ft. False Northing: 0.0000. Scale Reduction: 0.99990000 Datum is North American Datum of 1927 (US48, AK, HI, and Canada) Spheroid is Clarke - 1866 Equatorial Radius: 6,378,206.400m. Polar Radius: 6,356,583.800m. '0 1018\ ~ Hole Direction Grid Coordinates of Well: 5993869.45 N, 476071.76 E Geographical Coordinates of Well: 70° 23' 39.7678" N, 150011' 40 Grid Convergence at Surface is -0.183° True North Grid North , ~:.-,;T -J ~ Grid North is 0.183° West of True North (Grid Convergence) To convert a True Direction to a Grid Direction, Add 0.183 degrees 20 May, 2003 - 9:53 Page 10 of 10 ConocoPhillips ~ DrillQuest 3.03.02.002 ,......, r:t:: L.....I s:: o ....., ...... ~ ~ P-c Q) C/.) -, ----- Q) _.__.,__. -id - '~ . Q) U o ...... 16.0--= ".-. .- () ~ ...... s:: () U 14.0--= - . .... · ~U_ ..,.__ .. 12.0--= - ...- 10.0--= · " , : 8.0--= , : 6. <>--= . 4. <>--= . , : , · ' 0.0 III I I III III1I -150 Plan: 3S-20 (wp05) (Plan: 3S-20/Plan: 3S-20) .... ... ,.. .... . Jnc<'TLIjE!,jnn. ~¡~.. j'fLf,,~ :!.' .; .. 11. rJ1~t~nrp , .;. . . . , iE'¡¡ltjJIH¡H'j,j!E'.C~ '., ..... í _.i'" : . :n.:. ......... .... nd h- -,:::: . . , , , . , . . . . . . - . . · .. . '.. .' ·······~~aill-I~i: : " '.. nnn .. .' '. ¡ : : ' " ...... .,.... inl, Ln.. . nn . . . . 'Xn . . '·----r'... .j: :... .. . "n. .....n -, " , , , . ¡... .n'n n.,..n ' " , I I II I I I i I I I I I I I I I ': I ¡ j I I ¡, , , i I I , D. ". ~-', ...,.. · , .... ......... ........... I · - .- , . . . . · · . . '. : · : · · : : · : · , · . , ' .: · · : : , · . , ,.. . ..... , .. , , . . . .... , · . '.- , . , II II IIII · '--- · , · ¡- , . - ; : ¡,.: '- , ~. , , , , , , . . · -:~ , · . ..,mn , · . , ¡ , , , ' .' , : : , , , - '. ¡ , . , , . · : : , ..,..nn · -iHÚJ,J' . ..[..1..1-.. .,. ..... .... . , .. . ' · .-- . . , ¡ '..' :!i~~!¡ , . . . . ' · · ' · , , , , · ' · · . . " . ' , . · ' , . - , _n,.mm , , ¡ ¡ ¡ . . ¡ ; , , ' , , I ¡¡¡¡Ii ¡"jillli""i ...., : II . . I I I I I I I I II I I I I I I I 1050 1100 1150 1200 1250 í j IIII I I I I II I I II I I 3S-09 (3S-09) 3S-16 (3S-16) 3S-21 (3S-21) 3S-26 (3S-26A) 150 200 300 350 550 Measured Depth [ft] 3S-10 (3S-10) 3S-17 (3S-17) 3S-22 (3S-22) 3S-14 (3S-14) 3S-17 (3S-17A) 3S-23 (3S-23) 3S-15 (3S-15) 3S-18 (3S-18) 3S-26 (3S-26) ) SPERRY SUN HES ') Anticollision Report Company: Phillips Alaska Inc; Field: KuparukRiver Unit . . Reference Site: Kuparuk 3SPad·· Reference WeD: Plan: 3S-20 Reference WeDpath: Plan: 3S,.20 NO GLOBAL SCAN: Using user dermed selection & scan criteria Interpolation Method: MD Interval: 25.00 ft Depth Range: 28.10 to 12900.00 ft Maxinnun Radius: 1487.19 ft Survey Program for Dermitive WeD path Date: 5/15/2002 Validated: No Planned From To Survey ft ft 28.10 900.00 28.10 12900.00 Casing Points MD ft 4258.00 12900.00 TVD ft 2611.36 6010.56 Planned: 3S-20 (wp05) V9 Planned: 3S-20 (wp05) V9 Diameter in 9.625 7.000 Hole Size in 12.250 8.500 Name 95/8" 7" Summary <------~--------------- Offset W eDpath ----~-------,.---~-~---> Site WeD WeDpath Kuparuk 3S Pad Kuparuk 3$ Pad Kuparuk 3S Pad Kuparuk 3S Pad Kuparuk 3$ Pad Kuparuk 3$ Pad Kuparuk 3S Pad Kuparuk 3S Pad Kuparuk 3$ Pad Kuparuk 3$ Pad Kuparuk 3S Pad Kuparuk 3S Pad Kuparuk 3$ Pad Kuparuk 3$ Pad Kuparuk 3$ Pad Kuparuk 3$ Pad Kuparuk 3$ Pad Kuparuk 3$ Pad 3S-09 3S-10 3S-14 3S-15 3S-16 3S-17 3S-17 3$-18 3$-21 3S-22 3$-23 3$-26 3S-26 Plan: 3S-03 Plan: 3S-19 Plan: 3S-19 Plan: 3S-24 Plan: 3S-24 3S-09 V2 3S-10 V6 3$-14 V2 3S-15 V4 3S-16 V4 3$-17 V6 3$-17A V2 3S-18 V4 3$-21 V4 3S-22 V1 3$-23 V4 3$-26 V2 3S-26A V3 Plan: 3$-03 V3 Plan: 3 Plan 3S-19F V3 Plan: 3 Plan: 3S-19 V2 Plan: 3 3$-24 FB VO Plan: 3S-2 Plan: 3S-24 V7 Plan: 3 Date: 5/20/2003 Tbne: 08:37:19 1 Page: Co:.ordinate(NE) Reference: Vertical(TVD) Rëfërence: Well:Plan:3S:':20, True North . RKB= 55.8' M$L 55.8 Reference: Error Model: Scan Method: Error Surface: Db: Oracle · Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Version: 3 T oolcode Tool Name CB-GYRO-SS MWD Camera based gyro single shot MWD - Standard Reference Offset Ctr-Ctr N o~Go Allowable MD MD Distance . Area Deviation Warning ft ft ft ft ft 199.29 200.00 220.83 3.80 217.04 Pass: Major Risk 199.48 200.00 200.38 3.95 196.43 Pass: Major Risk 248.23 250.00 120.12 4.37 115.76 Pass: Major Risk 320.46 325.00 100.90 5.34 95.58 Pass: Major Risk 223.60 225.00 80.48 4.29 76.19 Pass: Major Risk 248.38 250.00 60.68 5.07 55.61 Pass: Major Risk 248.38 250.00 60.68 5.07 55.61 Pass: Major Risk 421.81 425.00 37.86 6.39 31.58 Pass: Major Risk 299.36 300.00 21.23 5.09 16.15 Pass: Major Risk 600.08 600.00 24.29 8.74 15.57 Pass: Major Risk 378.09 375.00 58.46 5.96 52.52 Pass: Major Risk 953.24 950.00 51.40 15.42 36.13 Pass: Major Risk 953.24 950.00 51.40 15.42 36.13 Pass: Major Risk 245.66 250.00 340.29 4.97 335.32 Pass: Major Risk 349.04 350.00 20.16 6.30 13.87 Pass: Major Risk 349.04 350.00 20.16 6.30 13.87 Pass: Major Risk 895.43 875.00 75.39 16.58 60.60 Pass: Major Risk 895.43 875.00 75.39 16.32 60.23 Pass: Major Risk l\ ( ~' ,I -- -0 -S.O -10.0 3S-21 (3S-21 -15.0 ------ -20.0 20.0 -22. 18¿.2.1 3S-20 (}vp05) APPROVED Plan Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [10ft/in] From Colour To MD 0-250 250 - 500 500 750 750 - 1000 1000 1250 1250 - 1500 1500 2000 2000 3000 3000 - 4000 4000 - 5000 5000 - 6000 6000 - 7000 7000 - 8000 8000 - 9000 9000 - 10000 1??oo - 11000 11000 - 12000 412.~1~:O - -' WBLP ATH DETAILS Phn,3S·20 N7ES RKB : 55.8" MSL 55.8Oft Origin origin Starting +NI-S +Fl· W From TVD 0.00 0.00 0.00 Rig, Ref. Datum: V.SocmD Angle 235.00' o 22. 20.0 COMPANY DIIT AILS P~s Ah.;ka Inc. Fngi1eering Kuparok Cakubfun Method: MnInum CIUValUre Error S}'1em: ISCWSA Scan Method, Trav CyIDder Nonh Error Surface: Ellipt>:al + Casing Wamng Method, Ruks Based AJ'IITl-COLLlSI0N SETI1NGS Interpolation Method:MD Interval : 25.00 Depth Range From: 28.10 To: 12900.00 Maximum Range: 1487.19 Reference: Plan: 3S-20 (wp05 Colour ToMD - 250 - 500 750 - 1000 1250 - 1500 2000 3000 - 4000 - 5000 -22.1 - 6000 - 7000 - 8000 -20.0 - 9000 - 10000 - II 000 - 12000 - 13000 -15.0 -10.0 -S.O 90 Nan>: +N!. +IY·W Nurth... Ii.a...ûng I....ítud Longitude Sbt Pbn: 35·20 25.25 -3H3.J6 m.IWJA 47fo071.76 70'23"39.7MN 150'II"40.873W NlA SURVEY PROGRAM Depth Fm Depth To SurveylPlan Tool 28.]0 900.00 Planned: 35-20 (wp05) V9 CB-GYRO-SS 900.00 ] 2900.00 Planned: 35-20 (wp05) V9 MWD 0 ...... '- '-, "- - - ~:@'þ..::(,. ~.-3~ .\..' ..\ .'r....>;. >,:",-"J' .~ ~'\ ",'" qf~" ~. -0 270- -25 ~ -50 -75 -]00 -105 -105 -100 -50 -75 -25 [:~~,); --.-.,"'-...--- See MD ne A,j TVD +N/·S +fJ-W DLeg TFace VScc Targel I 28.10 0.00 0.00 28.10 0.00 0.00 0.00 0.00 0.00 2 200.00 O.<XI O.<XI 2oo.<XI 0.00 0.00 0.00 0.00 0.00 3 7<X1.<XI IO.<X) 220.00 ffJ7.47 -33.34 -27.98 2.<XI 220.<XI 42.04 4 2131.20 66.&4 235.76 1774.82 ·541.69 -709.43 4.<XI 17.28 891.83 5 12582.81 66.84 235.76 5885.80 -5947.17 -8653.63 0.00 O.<XI 10500.14 3S (20) 6 12'J<x). <XI 66.&4 235.76 6010.56 -6111.84 -8894.72 0.00 O.<XI 10791.74 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [50ft/in] )) 35-20 Drillina Hazards Summary 12-1/4" Hole / 9-5/8" Casina Interval Risk Level I M iti~ation Strateqy Low Monitor cellar continuously during interval. Event Broach of Conductor Gas Hydrates Gravel/Sand Sloughing Surface to 500' Hole Swabbing/Tight Hole on Trips Possible thaw bulb / water flow around 1200' Lost Circulation Low Moderate Moderate Low Low 8-1/2" Hole / 7" Casing Interval Event Shale stability in HRZ, K-1, and Miluveach High ECD and swabbing with higher MW's required Barite Sag Differential Sticking Abnormal Reservoir Pressure Lost Circulation Risk Level Low Moderate Low Moderate Moderate Moderate If observed - control drill, reduce pump rates, reduce drilling fluid temperatures, Additions of Drilltreat. Increase mud weight / viscosity, High viscosity sweeps. Monitor fill on connections Circulate hole clean prior to trip. Proper hole fill (use of trip sheets), Pumping out of hole as needed. Watch return viscosity for signs of thinning. Increased mud weight/viscosity as needed. Prevent by keeping hole clean. If losses occur - reduce pump rates and mud rheology, use LCM M iti~ation Strate~y Control with higher MW, proper drilling practices and low HTHP water loss. Condition mud prior to trips. Monitor ECD's with PWD tool while drilling across pay interval. Pump and rotate out on trips as a last resort. Good drilling practices as documented in well plan. Periodic wiper trips. Do not leave pipe static for extended period of time. LCM sweeps. Follow mud weight schedule and do not fall behind. Stripping Drills, Shut-in Drills, PWD Tools, Increased mud weight as needed. Ensure adequate kick tolerance prior to drilling pay interval. Use PWD to monitor hole cleaning and ECD. Reduced pump rates, Mud rheology, LCM. Use GKA LC decision tree. 3S-20 Drilling Hazards Summary. doc prepared by Scott Lowry 7/30/02 , ,I I' j ! : ¡ ".':.'-~ Page 1 of 1 KRU - 35-20 Injl....\or ) . .~ C· . ···0· .... ···n··· ·'0·····'0·· ··..Dh·I·····~··I'·I¡p· S· ...,'.,.' ...'¡..... ... '..- ......,~ . ;,. II'. ' ; .........'.. Proposed Completion Schematic 16"x30" insulated ~ ~ conductor @ ~ ~ +1- 108' MD I ~ I ~ ~ ~ TAM 9-5/8" porit/l. d Collar Stnd ~ Grade BTC ~ Threads (+/- ~ 1000'MD/TVD) ~ ~ ~ Surface csg. ~ 9-5/8"40# L-80 ~ STC (4258' MD I ...tIIIIII4 2611' TVD) Casing point 100' above the C80 sand Production csg. 7" 26# L-80 STCM (12900' MD) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ "~II ~ ~ ~ ~= ~ ~ ~ ~ .J -.:....~ j :¡ .--.-~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Gemën~ ~ f ~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ ~ ~ L..... ~~ ~~ ~ ~ ~ f'¿j ~ ~ ~ I ~ 8 ~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r yoo .coo r- ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 3-1/2" FMC Gen V tubing hanger, 3-1/2" L-80 EUE8RD pin down. Special Drift 2.91" 3-1/2", L-80, 9.3# EUE8RD Spaceout Pups as Required. Special Drift 2.91" 3-1/2" Camco DS Landing Nipple with 2.875" ID No-Go profile set @ +1- 500' MD. Use of port collar at the discretion of the drilling team. Cameo GLM: 3-112" x 1" 'KSUG' GLM wI DCR Dump Kill Valve (3000 psi casing to tubing shear). 6' L-80 handling pups installed on top and bottom of mandrel. 1 Joint 3-1/2", L-80, 9.3# EUE 8rd Mod Tubing. 3-1/2" Baker 'CMU' sliding sleeve wI 2.813" Camco No-Go profile, EUE8RD box x pin. 3-112" x 6' L-80 EUE8RD handling pups installed above 1 Joint 3-1/2", L-80, 9.3# EUE 8rd Mod Tubing. 6' Handling Pup Joint 3-112", L-80, 9.3# EUE 8rd Mod Tubing. Saker '80-40' PSR. Saker 7" x 3-1/2"'SAS-3' Permanent Packer set +1- 300' MD above top planned perf. Minimum ID through the packer 3.00". 6' Pup Joint 3-1/2", L-80, 9.3# EUE 8rd Mod Tubing. 3-1/2" Cameo 'D' nipple wI 2.75" No-Go profile. 6' Pup Joint 3-112", L-80, 9.3# EUE 8rd Mod Tubing. Saker 3-1/2" WL Re-entry Guide wI shear out sub. Tubing tail 50' above top planned perforation. Kuparuk C Sand: BHP = 3400 psi (SCMT and Perfs to be done after rig moves off) TD @ 12900' MD 16011' TVD (300' MD below T/Miluveach) S. Coyner 6/05/03 /~ I, ~l t.l " -- !-- S. K. ALLSUP-DRAKE CONOCOPHILLlPS 711 G STREET· A T01530 ANCHORAGE AK 99501 DATE1JNL /G( 2fX)3 62-14/311 PAY TO THE 51/f76 OC IIL-IfS. .. ~{A. /./fCX3¡CC OR:: a- LlJ; eLL J~frÞa- L$ 100. 00 , DOLLARSfð< =":: <11IIII" CHASE Chase Manhattan Bank USA, N. .A. Valid U.. P To 5000. .. Dollars .., '"'",h'''~~'~.''''~" "'" . ...... ..... A--' ........... . .U". MEMO 3S·lo L £k, ~ I: 0 ~ ¡. ¡. 0 0 ¡. t, t, I: 2 ¡. 8 0 0 0 Ot, 2 ? 2 5 711- ¡. Ot, c:¡ -- - - --------~_. - ~ ----" Rev: 07/10/02 C\jody\templates ) ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME /CRt{ 3<;~ 20 ~o"3 -/Dcg PTD# CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) PILOT (PH) "CLUE" The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to· be reported as a function' of the original API number stated above. . HOLE In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number· (50 70/80) from records, data and logs acquired for well (name on permit). SPACING EXCEPTION DRY DITCH SAMPLE The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. WELL PERMIT CHECKLIST Company _CO~O_C_QPHILlIPS ALASKA INC Well Name: KUEABJlKB1Y_UNIT :is:.~O Program _S.ER Well bore seg 0 PTD#: 2031080 Field & Pool ~UPARUK RIVER, KUPARUK RV OIL - 490100 Initial Classrrype SER /1WINJ GeoArea -690 Unit 11160 On/Off Shore .9-.0_ Annular Disposal 0 Administration [1 Pßr:mitfee attache~L " " " .. . , , " _ " _ _ " _ _ _ " _ _ " _ " _ _ _ _ _ _ _ _ _ " " Yes - " " " " " " " - - - " " " " " " " " - - - - - , - - " - ' - - - " - - - - - " , - - . . . ' - - - - " " " - " - " " " " - - - - " " " - - - - . - " I~ "Lease_n~mber ,apRrORriate.. _ _ . . . " " " _ " , , " _ " _ " " _ _ _ " " , ' _ " " Yes - - . " " - , . - - , ' , " " " " " " - - . . - . . . " - . - - - - - " , " , " - - - ' - " - - , " " - - " " " " " . - " . _Uni.que welLnamß_aod oumb_er: _ " " _ _ _ _ " " " _ _ " _ _ _ _ _ _ " " , ' _ _ " " _ _ . _ " " Yes - " - " . . . - - " " - - - - " " - - - " " " - - , " - - - - - " - " " - - - - - - " " - . - . - - - - . - - - - - - - - - " " " " " " " " , \4 Well JQcatßd in_a_ d.efine~ ,pool. " " ' ' " _ _ " _ _ _ _ _ _ " " _ _ _ . _ ' " " " " _ " _ _ _ ' _ " " Yes" " " " _ _ _ Gov_emßd by cO ~32.B_. - - - - - - - - - - - - - - - - - - - - - - ' - - " - - - . , " " - - - - " " " - - - - - - - . - - - - - - 5 Well JocateQ prpper _di.staoce_ ((om. dri.lling I)nit.b"oundary_ _ _ _ " _ _ . _ _ " " " _ " _ _ _ ' _ _ " _ _ Yes - - " - . " , " - " - . - - . - - - " " " , " , " - - - - . - " - " - - - - - - - " " " , - - " " " - - - - " " - - - .. - - " " " " " - , " " " ' " - 6 _WellJocatßd pr_oper _di.stance_ ((om. Qtber wßl!s_ _ _ _ _ _ _ " " " _ _ _ _ _ " " _ . _ _ . _ " " " " _ _ _ Yes - - - - - " - - - - - - " " - - - " " - - - - - - - " - - . - - - - - - - - - - - - - - - , - " - - . - " " - - - - - - - " " " " " " " " " " " " " " 7 .S,ufficient.acrßage_ayailable inßril.liog unit. _ . _ _ " _ " , _ _ _ _ _ _ " " " " " _ _ _ , " " " " _ _ _ _ Yes - " - - - - - - " - - - - - - - - - - - - - - - - - - - " - - -- - - - - - - " " - - - - - - " " " - - - - - " - - - - - - " - " " , " " " , - " " - 8 Jf.devi¡atecl, ,is_ weJlbore pl¡atJnc)u~ed " _ _ _ " " _ _ _ _ _ _ _ _ " " _ _ . _ ' " " " " _ _ _ _ _ " _ _ _ _ Yes" - - - . " " - - " - - - " - - - - " " - , ' - - - . - " - - - - - " " " - - - - . - " - " - - - - - " " - - - - .. - " " " - " " . 9 _Qpß(ator only affected party" _ _ _ _ _ _ _ " _ _ _ _ _ " " " " " _ _ _ _ _ " _ _ _ _ _ _ " " _ _ _ _ _ _ " Yes - - " " - - - - - - " " - " - - - - - - - - - " " - " - - - - - - - - - - - - - - - - - " " " " " " " " - . " - " - " - " " " " " " " " " , 10 _Oper:.ator bas_appropri,ate_bond i.nJQrce _ _ _ " _ _ " " _ _ _ " " _ " _ _ , " " " " " " " " _ _ _ _ _ _ _ Ye$ - " " - - - - - - " - - - - - - - - " - " - - . - . - - - - - - - - - - - - - - " - - " - - - - - " - " - - - - - - " - " " - - - - - - - - - . , - " 11 "Per:mit. QaO Þe i.ssueÒ .wjtbout conservation order _ _ _ _ _ _ " " _ _ _ _ _ _ " _ _ _ _ _ " " " _ " _ _ " Yes - - - - " . - - - . - - " - " - " - - - - - , - - " " , " - - , - - " - - " - - - - - - , " " " " - - - - - - - - " " - - - " - " " , " " - " - ' Appr Date 12 Per:mit. QaO Þe i.ssueÒ wjtbout ad.mini$tr:ati~e_approvaJ _ _ " _ _ _ _ _ _ , _ _ _ _ " _ - - - - - - - - - Yes - - " " - - - - - - - - - - - - - - - - - - - . - - - - - " - " - - - - - - " " - - " " " " " " " " - , " , " " " - " " " - - - - - - - - - - - SFD 6/19/2003 13 _C_ao permit.be apPJQved before _15-ò¡ay" wajt _ " " " " " _ " _ _ _ _ " _ _ _ - - - - - - " - " - - - - " Yes - - " - - - - " - - , - " " - - - - - - " " " - - - - - - - - - " " - - - - - - - - - " - " - - - - - - - - - - - - - - - - " " " " " " - " - - " " - 14 _WeIUocatedwi.thinGlreaGlnd"strataautl1ori.zedby_lojectiooOr:der:# (put..lO# in"cor:nmeot$).(for_ NA""" - - - - -,," - - - - - - - - - - - - - - - - - - -" - - - - - - -" -"" -" - - - - - - - - -"" - -" - - -"" -" -" -'''''''''' -" - ( 15 "A)lwel)s"witnifl..1l4_mite_are_a_ofr:eyiewideotified(For:~ervjce..w..ellOnly).." _ _ _ _ _" _ _ _ _ _"" Ye$_ _ _,,, _ _Non_e..witl)io.:11.4_mile._ -" -" -""" - - - -""" -" -" - -" -" -"""""""" - - - - - -" - -"""" -"" - - -",,- 16 Pre-produ_ced. injector; ~uration_of pre-pro~uction less_ tl'1G1n_ 3 mOIlJhs_ (for_ser:vi..ce well" Qn)y) _ _ _NA _ _ _ _ _ " " - - - - - - , - " - " " - - - - - - , - - - - - - - - - - - " " - - - - - - - - - - - " " - - - - - - - " - - - - " " - - " - " - - " - 17 .AÇMP_Fjnding_ofCQn_si.stency_hasbee"nj~sued.for..tl)i$prpiect _ _ _ _ _" _ _ _ _ _" _"" _ _"" NA"" _""" _l?re-:e~isting~r:illRaÒ._ - - -""" - - - -" -" -"""" - - - - -" - -" -"" - - - - - - -""" - - -" -" - -" -"" - -- _C"oodu'ctor str:ill.9-prQvided _ " _ " _ " " " _ " " " _ _ _ _ _ _ _ _ " _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - Yes - - " , - - - - - - " " - - - - - - - - - " - - - - - - - " - , - " - " - - - - - - - - - - - " - - - - - - - " - - - " " - - - - - - - - - - - - - - "S_ur:face_~~ing_PJQtec.t~all_k[lown_USQWs _ " _ _ _ _ _ _ _ _ " _ _ _ " " " _ _ _ _ _ _ " _ _ _ _ _ _ _ NA _ _ _ _ _ _ _AltaqjJifeJsex.er:npted~QCrß j47_.1.02_(b)(3)" - " - - - - - - " - - " - . - - - - - - - , " " - - - """ - - - - - " - - " - _CMT.. v_at adequ_ate..to circjJlat.e_ofl_condjJctor_ & $U_rf_CSg _ _ " _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ " . Yes - - . - - - - - - - " - , - - - - - - - - - - " " - - - - - - " - - - - - - - - " " - - - - - - - - - - - - , - - - - - - - - - - - " - - - - - - .. - _CMT..vptadeQu_ateJ9tie-i..nJQng_stri[lgto.sur:f~g_ _ _ _ _ _ _ _ _ _ _ _." _ _ _ _ _. _ _ _ _ _ _ _ _ No_ _ _ _ _ _ _ _Ann.utar(;Hsp_osalultimQtelyplaOll.eÒ._ - -. - - - -" - - - - - - - -. - -. - -" - - - - - - - - - - - - - - -. - - - - - -- _CMT.. will coyer _all .!<oow..n _pro.ductiye bQri~Qn_s _ _ _ _ , _ _ _ _ _ _ _ " _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ Yes - - - - - - - " - - - - - - , - - " - - - - - - - - - - - - - - - - - - - - - . " - - - - .. - - - - - - - - - " - - - - - - - - . - - - - - - - - - - _C_asiog designs Gld_eçuaJe for: C,_T~ a _&_ Rermafrost " _ _ _ _ _ _ , " _ _ _ " .. " _ _ _ _ , _ _ _ _ _ _ Yes - - - - - - " " " - - " - - - - " " " - - " - - - - - " " " - - - - - " - - - - - - - - , - - - - , " , - - - - - - - - - - - - - .. " " " " - - - - " Adequate.tan_k¡age_oJ re_serye pit _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ , . _ _ _ _ _ _ " _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ ßig equiRPeQ wiJh steeJ pits. No JeseIYe pit planned._ Waste to.a"n"approve~ _an 0 uJu_s_or diSRO.$GlI welJ. " " , _ " _ _ " Jf.a_re-~r:ill~ tlé~S"a. 1.0:403 for abanòonmeflt beeo apprQved _ _ " " _ _ _ _ " _ _ _ " _ _ _ _ " " _ _ _ NA - - - - - " . - " - - - - - , - - - - - - - - - " . - - - - - - - - - " - " - - - - - " " - - - - - - - - - . - - " - - .. - - - - - - - - - - - - - - Adequate.weUbore ~eparatjo..n _proposeò _ _ _ _ _ _ _ " _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ Yes _ _ _ _ _ _ _ I?ro~imi..ty- a.nalysis perfprme_d, .Glo.$s ¡aRPro_ache.s jd_nt.ifieÒ._ Tr_aveli(1g çy)iod_er plotJncluòed.. _ GyrQsJikely. _ _ _ _ _ _ Jf.djvßrter..req.uire.d.doe.$jtmeet..reguJa..tions_ _ _ _ _ _ _. _. _ _ _ _ _ _ _. _. _ _ _ _ _ _ _. _ _ _ NA _ _ _ _ _ _ _OS3Sl1G1s_beeograotedadiverter:w~i~er._ - - - - -. - - - - -. -. - - - - - - - - - - - - - - - - - - -. - - - - - - -- _DJiUiOgf!uid_p-rQg.ramsc.hematic_&_e.q.uipJist..aòequat.e_ _ _ _ _". _ _ _ _"" _ _ _ _ _ _ _. _ _ _ .Yes_ _ _ _ _ _ _M¡axexpecte_d_B_HP..t1.1..E.MW._ Pla(1ne~..MWto.t1..6.iol<URaru"k, - - - - - - - - - - - -" - - - - - - -. -'" - - -,,- .B..o..Pç:$,. dp ..they meet.. reguJa..tiOI1 . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ " . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Yes - - - . - - - - - - " - - - " - - - - - - - - - . - " - - - - " - - - - - - - " - - - - - - - - - - - - - - - - - - - - - - , - - - - " - . - - - , - )_BOPE_pressra_tiogappropriate;..tesHo..(pu,tPSigifl_commel1ts. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Yes _ _ _ _ _ _ .MASl?calc.ulate_d_at2~6ßp$i." 35QO_p.sÌ"appropriate_. ..PP.GoJilseJy,tote_stto_50QO_p_si... _ _ _. _ - _ - - - _". _. . __ .C"hoke_manjfold cQmpJies_ w/API. R~-53 (May 64), _ _ _ _ _ . _ _ _ " _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .Yes - - - . - - - - - - " . " - - - - - - - - - - " - - - - - - - " - - - - - - - - - - - - - - - - - - - " . - " - - - - - - - - - " - " - - - .. - " - . _Work wi!.1 pcc.ur withOIJt..operation _sbutdo..w..n_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ " " _ _ _ _ _ _ _ _ _ _ _ _ .Yes - - - - - - " - - - - - - - - - " - - - - - - - - - - - - - . - - - - - - - - - - - - - - - . " - " - - - - " - - - - - - - - - - - - .. - - - - - - - J~ pre~ence_ of H2S gas_ Rrob_aÞle _ _ _ _ _ " _ _ _ _ _ _ . _ _ _ _ _ _ . " _ _ _ _ _ , . _ _ _ _ _ _ . " _ No - . - - - - - - - - - - - - - - - " " . - - - - - - - - . - - - - - - - - - - - - - - - - - - - , - - - - - - - - - - - - - - - - - - - - - - - - - - - ..MeçlJa_niCÇlI_coodjti.on O{ Well$ wi..thin AQß verified. (for_s_ervice welJ QnJy-) " _ _ _ _ _ _ _ _ " _ _ _ _ .Ye$ _ _ _ _ _ _ _ There_ are (lQ well.$ withio 1/~ mile of.. tbe top of..tbe. ~u.par:uk." - - - - - - - - - - - - - - - - - - " - - - - - - - - - - - - - Per:mit.. c_a(1 Þe i..sSl!.eÒ wlo_ hyòr_ogen_ s.ulfide. meas.ur:es _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ " _ _ _ _ _ Yes - - - - - " . - - - - - - - - - - .. - - - - - - - - - - - - - - - - - - - - " - - .. - - - - - - - - - - - - - - - - - - - - - - - - . - - " - - - - - _D_ata_preseoted on Rote.ntial ovemres.surß_zone.$_ ".. _,_ _ _. _ _ _ _ _ _ _ _" _ _ _ _. _" _ _ _ _ Yes_" _ _ _ _ _ExpeçtedRre~surejs_t1.,tRP9"EMW;w.iltbe.drilJe_d.w.itb.:11.8ppgmud_._ - - - - - - - - - - - - - - - - -"" - - - - -_ _Sei.slJ1ic_aflalysjs_ of shaJlow gas_zooes. _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ " _ NA - - - - - - - " - " - - - - - - - - - - - - - - - - - - - - - " - - - - - - - - - - - - - - - - - - " " - . - - . - " - - - . - - " - - - " - - . - - "Seabeò _condjtioo survey..(if oft-shore) _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ . _ " .. _ _ _ _ . _ NA - - , . - - - - - - . - . - - - - - - - - " - - - - - - - - . . - , - - - - - - - - - - - - - - - - , - - - - - - . . . . - , . " - - " " - - . . - - _ Conta.ct namelpnOll.e..for_weekly progre&s"reRorts [e2<pIQratpry _only].. _ _ _ . " , _ . _ _ _ _ _ _ _ _ NA - - " - - - - - - - . - - - - - - - - " - - - - - - - - - - - - - - - - - - - - - - - - - - - " - " - . - " - - " - - - " " " . - - - - - - - - - - - Engineering 18 19 20 21 22 23 24 25 26 27 Appr Date 28 TEM 6/19/2003 29 30 31 32 33 34 Geology 35 36 Appr Date 37 SFD 6/19/2003 38 39 Geologic Commissioner: DTS '. Date: Engineering ~~er: Public ~/~ Commissioner Date o b ( 2.0/QJ