Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-046 Image ~ .hject Well History File C"Jer Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ 03 - 0 ~ Well History File Identifier Organizing (done) D Two-sided 1111111111111111111 REjCAN \7"color Items: o Greyscale Items: DIGITAL DATA ~kettes. No. / o Other, NolType: o Poor Quality Originals: o Other: NOTES: BY: Helen.~ Project Proofing BY: Helen ~ Scanning Preparation I x 30 = ~--3 D BY: HelenC"Maria) ~can Needed III OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) o Logs of various kinds: o Other:: Date: 7 ¡í~of/sl y1¡tD Date: 7 J~~S"' Isl m-.J + J I = TOTAL PAGES IL " (COunt.d?e~not inot'ude cover ""Jee~_) JAA " ,n Date7//~1Is/l rrv: Production Scanning Stage 1 Page Count from Scanned File: ~~ount does include cover sheet) Page Count Matches Number in Scanning Preparation: V YE~ A ~O BY: Helen .(Maria ) Date: 7. I ~I 0--5 Isl Stage 1 If NO in stage 1 page(s) discrepancies were found: YES NO BY: Helen Maria Scanning is complete at this point unless rescanning is required. ReScanned BY: Helen Maria Comments about this file: vvtP Date: /5/ 11111111111111111/1 1111111111111111111 I Date: /5/ Quality Checked 11I1111111111111111 .,~~~L~' STATE OF ALASKA 6 a ~ ALASK~L AND GAS CONSERVATION COM~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~~~ ~ z~a~ 1a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended zoAACZS.~os zoAACZS.~~o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero ~~~I I~~#=~i0fls, I'rlmiSSiot? 1~9 Dev I ~j LJ Exploratory ^ Serv~i ~~~°5 ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 5/16/2009 12. Permit to Drill Number 203-046 308-425 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 04/27/2003 13. API Number 50-029-22142-01-00 - 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 05/01/2003 14. Well Name and Number: F-45A ' 3098 FNL, 2196 FEL, SEC. 02, T11 N, R13E, UM Top of Productive Horizon: 4105' FNL, 1383' FEL, SEC. 02, T11 N, R13E, UM 8. KB (ft above MSL): 65.71' .~ Ground (ft MSL): 36.24' 15. Field /Pool(s): Prudhoe Bay Field / Prudhoe Bay Total Depth: 3282' FNL, 2039' FEL, SEC. 02, T11 N, R13E, UM 9. Plug Back Depth (MD+TVD) 9090' 8837' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 652650 y- 5973714 Zone- ASP4 10. Total Depth (MD+TVD) 11151' - 9043' - 16. Property Designation: ADL 028280 ' TPI: x- 653485 y_ 5972725 Zone- ASP4 Total Depth: x- 652811 y- 5973535 Zone- ASP4 11. SSSV Depth (MD+TVD) N/A 17. Land Use Permit: 18. Directional Survey ^ Yes ®No mi I r ni n rin inf rm i n r AA 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD, CCL, GR, MCNL 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT: GRADE TOP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED rface 11 Surfa 110' 1 - # 17-1/ " rm -5/8" 47# NT - rf 10' rf 2' 12- /4" 174 C ' 7" 26# NT1 r8 4 971' 8-1 ft Perm r 4.7# 14 ' 7 I ' 23. Open to production or inject ion? ^ Yes ®No 24. TUBING RecoRo If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD 4-1/2", 12.6#, L-80 2123' MD TVD MD TVD 3-1/2", 9.2#, L-80 9196' 8374' & 9165' 25. ACID,'FRACTURE, GEMENTSQUEEZE; ETC. ~Y~ P~;~,~k~J ~ ~~~,4 ,y, ft ~~~~ DEPTH INTERVAL MD AMOUNT $c KIND OF MATERIAL USED "'lu 6~i 9115' Set CIBP 9101' Set Cement Retainer 9101' P&A Perfs w/ 24 Bbls Class 'G' 9090' Set Whipstock 26. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. Casing Press: CALCULATED 24HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Core s A uired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None o Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE b .~ i ~ ,ii~F~ ~l ;~ 20Q 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND ERS ENCOUNTERED: 29. FORMATION TESTS NAME TVD Well Tested . ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. 22N 9251' 8972' None 22P 9253' 8973' 21 N 9306' 9008' 21 P 9312' 9011' Formation at Total Depth (Name): 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 31. I hereby certify that the foreg ing is true and correct to the best of my knowledge. 5/ Si d ~ ~l~ ~ gne Title Drilling Technologist Date Terrie Hubble F-45A 203-046 308-425 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number P o. A r I N Drilling Engineer: Mel Rixse, 564-5620 INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITeM ia: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). ITeM 8: The Kelly Bushing and Ground level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITeM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITeM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITeM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only u F-45A, Well History (Pre Rig Sidetrack) Date Summary 04/17/09 FINISH NEUTRON ON PASS FOR GRAVEL PACK LOG, POOH AND WAIT FOR INTERPRETATION OF LOG. POSSIBLE TOP OF FILL AT 8720'. RUN TUBING PUNCHER LOADED WITH MEDIUM CHARGES TO PUNCH HOLES FROM 9108' - 9110'. SET 3-1/2" HALLIBURTON CEMENT RETAINER, TOP OF RETAINER AT 9101'. FINAL T/I/O = 500 / 690 / 50 PSI. WELL LEFT SHUT IN. ALL VALVES RETURNED TO NORMAL. JOB COMPLETE. 04/23/09 Pre nordic pressure test & service tree, test down swab 5 min 4500 psi pass, shell test tree 5 min 4500 psi pass, svc tree. T/I/O 1400/600/0 04/24/09 MIRU, MU WOT 3.5" cement stinger. Change out slip bonnet on BOPE. RIH above retainer. Do rate test C 0.5, 1, 1.5 , 2.0 bpm @ 2220 psig. Stung into retainer. -7.Ok down on retainer. Establish pump in rate below cement retainer Cam? 9101' out the holes punched C~3 9108' into the 7" X 3.5" and out holes punched C~ 8405'. PIR @ 0.5, 1.0, 1.5, 1.8 bpm Cagy 3900 psig. Call for cement. Monitor well pressure while pumping min rates. 04/25/09 Continue to monitor well while pumping 1 % KCL below Halliburton cement retainer. Wait on cement, fluids on location. Schedule here at 8:00 am. Cementers and all fluids on location at 9 am -Mix /pump 24 bbls Class G cmt at 15.8 ppg. Placed 20.5 bbl thru retainer lay in 4 bbls in tbg. Contaminate and wash cement to 9110 ctm (cement retainer at 9116 ctm). Make three wash passes from 8900 to 9110 across WS set depth. Chase cement out of hole with biozan and washing across jewelry. Trap 100 psi on well. RDMO. Job complete. Notify PCC / PO of well status. Note; Cement at 1000 psi compressive strength at 1730 hrs. 04/26/09 WELL SHUT IN ON ARRIVAL. DRIFTED & TAGGED C~ 9081' SLM W/ 6'x2.72" DRIFT, 2' STEM, 2.71" CENT., 2' STEM, 2.73" CENT. (13' OAL). ATTEMPT TO MIT-T TO 2500#. UNABLE TO REACH TEST PRESSURE. RAN OUT OF FLUID. WELL TURNED OVER TO DSO. 04/27/09 T/I/0=450/620/20 CMIT TxIA PASSED to 3000 psi (Pre CTD) Pumped down Tbg with 41 bbls diesel to reach test pressure for CMIT TxIA. T/IA lost 40/20 psi in the 1st 15 mins and 10/10 psi in the 2nd 15 mins for a total pressure loss of 50/30 psi in 30 min test. Bled TxIA. FWHP's = 200/640/20. Wing shut, Swab shut, SSV open, Master open, IA and OA open to gauges. Operator Notified. 04/27/09 WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O = 200/640/80. TOP OF BAKER 2-5/8" BY 3-1/2" MONOBORE WHIPSTOCK SET AT 9090' (TIED INTO CNL DATED 03-MAY-2003). WHIPSTOCK FACE SET 179 DEG RIGHT OF HIGH SIDE. RA TAG LOCATED 5.5' BELOW TOP, AT 9095.5'. OVERALL LENGTH OF WHIPSTOCK IS 8.7'. TRAY LENGTH IS 5.3'. WELL LEFT SHUT IN. PAD OP NOTIFIED OF VALVE POSITIONS ON DEPARTURE. FINAL T/I/O = 400/640/80. JOB COMPLETE. 04/28/09 T/I/O = 400/630Nac. Temp = SI. Monitor WHPs pre CTD. TP increased 200 psi, IAP decreased 10 psi, OAP decreased to Vac overnight. SV, WV = C. SSV, MV = O. IA, OA = OTG, NOVP. 04/29/09 T/I/O = 390/620/VAC. Temp = SI. Bleed WHPs to 0 psi (pre CTD). No AL. T FL Q 80' (1.5 bbl), IA FL C~ 620' (34 bbl). Bled IAP to BT from 620 psi to 450 psi in 30 mins (all gas). SI bleed due to time restraints. Monitored for 15 mins while rigging down, IAP unchanged. Final WHPs = 390/450NAC. SV, WV =Shut. SSV, MV =Open. IA & OA = OTG. NOVP. 04/29/09 T/I/0=300/490Nac. Temp=Sl. Bleed WHP's to 0 psi (pre-CTD). No AL. T FL Q 200' (<5 bbls). IA FL Q 600' (35 bbls). TP decreased 90 psi, IAP increased 40 psi since nightshift. Bled IAP from 490 psi to 200 psi in 1 hr (FTS), TP decreased from 300 psi to 150 psi. Continued bleeding TP &IAP simultaneously Q reduced rate for 3 hrs, 30 mins, 30/60Nac. Monitored 30 mins. TP increased 10 psi, IAP increased 40 psi. Note: Closed lateral valve, bled flowline from 1920 psi to 0 psi. Final T/I/O = 40/100/Vac. SV, WV = C. SSV, MV = O. IA, OA = OTG. NOVP. 04/30/09 T/I/O = 2/5/0. Temp = SI. Monitor WHPs pre CTD. TP increased 2 psi, OAP increased to 0 psi overnight. SSV is bleeding off. SV, WV = C. SSV, MV = O. IA, OA = OTG. NOVP. Page 2 of 3 U • F-45A, Well History (Pre Rig Sidetrack) Date Summary 04/30/09 T/I/O = 50/100/VAC. Temp = SI. 81eed WHPs to 0 psi (pre-CTD). No AL. T FL C~ 200' (<5 bbl). IA FL near surface. TP increased 10 psi, IAP unchanged since day shift. Bled IAP to BT from 100 psi to 0+ psi in 5 hrs. During IAP bleed, TP decreased 15 psi to 35 psi. Bled TP from 35 psi to 0 psi in 30 mins. Monitored for 30 mins, TP unchanged, IAP increased to 5 psi. Final WHPs = 0/5/VAC. SV, WV =Shut. SSV, MV =Open. IA & OA = OTG. NOVP. 05/01/09 T/I/O = 2/5/0. Temp = SI. Bleed WHPs to 0 psi (pre-CTD). No AL. T FL C~3 200' (<5 bbl). IA FL C~? 680' (37 bbl). Bled IAP to BT from 5 psi to 0 psi in 4 hrs. Bled TP from 2 psi to 0 psi in 1 hr. During TP bleed, IAP increased to 0+ psi, Bled IAP from 0+ psi to 0 psi in 45 mins. Monitored for 30 mins, TP unchanged, IAP increased to 0+ psi. Final WHPs = 0/0+/0. SV, WV =Shut. SSV, MV =Open. IA & OA = OTG. NOVP. 05/02/09 T/I/O = MASTEFVO+/0+. Temp = SI. Monitor W HPs (post bleed). No AL. Master valve safed out for F/L disconnect. IA unchanged, OA increased to 0+ psi overnight. SV, WV, MV =Shut. SSV =Open. IA & OA = OTG. NOVP. Page 3 of 3 • • F-45A, Well History (Pre Rig Sidetrack) Date Summary 02/22/09 WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O = 2250/530/50. RU ELINE TO SET CIBP, TUBING PUNCH. STANDBY FOR LRS TRANSPORT TO LOAD WELL. 02/23/09 T/110=2200/560/40 Assist E-Line (Pre CTD) Loaded Tbg for E-Line with 150 bbls dead crude. Standby for E-Line to set Plug. Flowline pressure was at 2500 psi upon arrivial. Flowline pressure climbed to 2860 psi at time of departure. Operator (Giddeon) notified about Flowline Pressure. Flowline Pressure exceeded Tbg pressure. 02/23/09 LRS LOADED WELL WITH 150 BBL CRUDE. T/I/O 130/580/560 ATTEMPTED TO SET 2.70" WEATHERFORD CIBP AT 9130'. GOOD SURFACE INDICATION OF SETTING TOOL STROKE, BUT PLUG NOT TAGGED AT SET DEPTH. TAGGED PKR TOP AT 9146', PLUG POSSIBLY FELL TO PKR TOP AFTER IMPROPER SET. LRS PT FAILS WITH LR AT 1.2 BPM. SECOND ATTEMPT SET HES 2.69" OD FASDRILL PLUG AT 9115'. PT FAILS -LEAK RATE OF 1 BPM AT 2400 PSI. RU ELINE LDL. LOGGED FROM TD PLUG AT 9115' TO 8300', ABOVE SWS NIP AT 1 BPM. NO FLUID OBSERVED FLOWING PAST PLUG. 02/24/09 T/I/0=2200/560/40 Assist E-line, CMIT TxIA FAILED to 3000 psi (Pre CTD). Pumped 77 bbls crude down Tbg. Pumped 21 bbls crude down IA to attempt CMIT TxIA that failed 5 times. FW HP's = 600/600/260. SV, WV = SI. SSV, MV =Open. IA, OA = OTG. Pad Op notified and tags hung. 02/24/09 ELINE LDL LOGGED PUMPING 1 8PM FOR UP /DOWN 80 FPM, 0.5 FPM FOR ANOMALIES PASSES AT 40, 120 FPM AND STATION LOGS. LEAK ANOMALY FOUND AT 8386'. CMIT T X IA TO 3500 PSI FAILED THREE TESTS. LRS TO STAY ON WELL AFTER E-LINE RIG DOWN TO RE-ATTEMPT CMIT AFTER GREASE CREW SERVICES WING VALVE. WELL LEFT SHUT IN ON DEPARTURE. FINAL T/I/O = 600/350/300. JOB COMPLETE. 04/06/09 T/IA/OA=SI/0/0 Temp=cold PPPOT-T (PASS) PPPOT-IC (PASS) (Pre CTD) PPPOT-T RU 2 HP BT onto THA test void 0 psi, flushed void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 4950/ 30 minutes. Bled void to 0 psi, RD test equipment. Cycled and torqued "ET style" all were in good working condition PPPOT-IC RU 2 HP BT onto IC test void 0 psi. flushed void until clean returns achieved. Pressured to 3500 psi for 30 minute test, 3500/ 15 minutes, 3500/ 30 minutes. Bled void to 0 psi, RD test equipment. Cycle and torqued LDS "ET style" all were in good working condition. 04/15/09 WELL SHUT-IN ON ARRIVAL (E-LINE TUBING PUNCH). INITIAL T/I/O: 380/600/0. FIRE 1.56" SMALL CHARGE TUBING PUNCH FROM 8405'-8407' (9 HOLES). TIED INTO TUBING TALLY AND LDL DATED 24-FEB-2009. 04/16/09 T/I/0=500/640/40 Assist E-Line with injectivity test. (Pre CTD) Pumped 12.7 bbls crude down Tbg, IA tracked, T/IA pressured up to 1500 psi, held pressure for 15 min. Bled T/IA. Repressured Tbg/IA to 3000 psi with 18.3 bbls crude, monitored for 30 minutes, T/IA lost 300 psi. Repressured T/IA to 3000 psi with 1.3 bbls crude, held for 30 minutes, T/IA lost 250 psi in 30 min. Bled T/IA. Final WHP's = 800/900/200. E-line in control of well upon departure. IA & OA open to gauges. 04/16/09 INJECTIVITY TEST AT 1500 PSI AND 3000 PSI SHOWED NO INJECTION THROUGH TUBING PUNCH HOLES INTO FORMATION. SECOND TUBING PUNCH PERFORATED FROM 8391' - 8393' WITH SMALL CHARGES (9 SHOTS). SECOND INJECTIVITY TEST ALSO SHOWED NO INJECTION AT 1500 PSI OR 3000 PSI. RIH WITH RST IN GRAVEL PACK MODE. MAKE BASELINE GR PASS FROM 8350' - 9115'. BEGIN NEUTRONS ON PASS OVER SAME INTERVAL. 04/16/09 T/I/0=650/860/120 Assist E-line with Injectivity Test post Tbg Punch (CTD Prep). Pumped 8.3 bbls crude and 8.4 bbls diesel down Tbg in attempt to establish injectivity. Tbg & IA pressured up to 3000 psi. Unable to establish Injectivity, Bled TxIA. E-Line in control of well upon departure. Pad-Op notified. FWP's = 600/660/100. Tag hung. IA & OA open to gauges. Page 1 of 3 • BP EXPLORATION Operations Summary Report Page 1 of 2 Legal Well Name: F-45 Common Well Name: F-45 Spud Date: 4/25/2003 Event Name: REENTER+COMPLETE Start: 4/23/2009 End: Contractor Name: NORDIC CALISTA Rig Release: Rig Name: NORDIC 1 Rig Number: Date From - To Hours Task 'Code NPT Phase Description of Operations - _ - - -- - - 5/15/2009 00:00 - 14:30 14.50 MOB P PRE Finish cleaning out cuttings box. 14:30-18:00 3.50 BOPSU~P PRE 18:00 - 23:30 5.50 BOPSU P PRE 23:30 - 00:00 0.50 MOB P PRE 5/16/2009 00:00 - 01:20 1.33 MOB P PRE 01:20 - 02:10 0.83 MOB P PRE 02:10 - 03:15 1.08 MOB P PRE 03:15 - 04:40 1.42 MOB P PRE 04:40 - 05:10 0.50 BOPSU P PRE 05:10 - 06:00 0.83 STWHIP P WEXIT 06:00 - 08:00 2.00 STWHIP P WEXIT 08:00 - 09:00 1.00 STWHIP P WEXIT ~C' \ ~• ~~ 18:00 - 00:00 I 6.001 STWHIPI P I I WEXIT 5/17/2009 - 0.00 00:00 - 23:00 23.00 STW H I P P WEXIT Jack up and move rig to F Pad. Route of travel is from DS-04, past PBOC, to West Dock Rd to Oxbow to Spine Rd to F Pad. Spot Rig over well. Accept rig at 14:30 hrs. NU BOP. Grease tree valves. Test BOP. Test witnessing waived by Chuck Sheve of AOGCC. Valves /Rams tested are 2" Combi, 2-3/8" Combi, Upper 2" Combi, Blind /Shear, Annular, Kill line valves on Stack, HCR, Choke manifold valves, and Inner Reel valves. Also both TIW valves. Pump forward to get diesel and KCI water out of reel. Pump backwards then cut 324 ft of CT to find cable. Test continuity and resistance of wire, good. Install CT connector, pull test to 35K, good. Visual inspection of CT connector shows some dimples in wrong spot. Cut it off and re-install it. Pull test to 35K is good. Install BHI cable head. Pressure test inner reel valve and CT connector to 3500 psi, good. PJSM M/U BHA #1 - 2.74" Diamond window mill, 2.74" String Reamer, 2-1/8" Xtreme Motor, 2 jts 2.06" CSH, 2-3/8" CoilTrak. BHA OAL = 109.46 ft. M/U CT riser and test tool. RIH. Log tie-in. MWD tool problem. +2'. ag i 1. pm 5 psi. 11:00 DWOB .28, 9090.65, 2322psi. 12:00 DWOB .33, 9090.80, 2212 psi 13:30 DWOB .72, 9091.30, 2051 psi. 14:00 DWOB .94, 9091.75, 2051 psi 15:00 DWOB 1.62 9092.2 , 2120 psi. 16:00 DWOB 1.67 9092.44, 1934 psi Mill window to 9092.44 ft. 18:00 9092.90 ft DWOB = 2.06 Klbs 1912 psi CT pressure 19:00 9092.95 ft DWOB = 1.44 Klbs 2120 psi 20:00 9093.20 ft DWOB = 1.61 Klbs 1981 psi 21:00 9093.55 ft DWOB = 2.03 Klbs 1882 psi 22:00 9093.75 ft DWOB = 2.29 Klbs 1890 psi 23:00 9093.80 ft DWOB = 1.92 Klbs 1765 psi 24:00 9094.17 ft DWOB = 2.85 Klbs 1868 psi Continue milling window. 00:00 9094.17 ft DWOB = 2.85 Klbs 1868 psi 01:00 9094.18 ft DWOB = 2.13 Klbs 1805 psi 02:00 9094.25 ft DWOB = 2.09 Klbs 1824 psi 03:00 9094.35 ft DWOB = 2.05 Klbs 1842 psi 04:00 9094.45 ft DWOB = 2.02 Klbs 1860 psi 05:00 9094.55 ft DWOB = 2.12 Klbs 1893 psi 06:00 9095.02 ft DWOB = 3.43 Klbs 2062 psi 07:00 9095.02 ft DWOB = 2.77 Klbs 1963 psi 08:00 9095.02 ft DWOB = 2.51 Klbs 1940 psi Printed: 5/18/2009 9:58:39 AM TREE _- 4-1/8" 5M CIW WELLHEAD = FMC ACTUATOR = OTIS KB. ELEV = 65.71' BF. ELEV - 37.95' KOP = 6300' Max Angle = 95° @ 10670' Datum MD = 9124' DatumTVD= 8800'SS 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 13-3/8" CSG, 68#, L-80, ID = 12.415" S'~~~TES: *** 7" CHROME LNR. *** TIW PKRS ~ MAY FAICIF MORE THAN 2100 PSI DIFFERENTIAL F 45A 2123' 2~64~ Minimum ID = 1.73" @ 9148' BKR LINER TOP PACKER TOP OF 7" LNR ~ 8426' 9-5/8" CSG, 47#, L-80, ID = 8.681" 8711' 2-5/8" X 3-1/2" BKR WHIPSTOCK (04/27/09) 9090' RA TAG 9096' 3-1/2" HES CMT RETAINER 9101' 3-1/2" HES CIBP (02/28/09) 9115' 3-1/2" TBG, 9.2#, L-80, .0087 bpf, ID = 2.992" I-{ 9196' PERFORATION SUMMARY REF LOG: SWS MEM GR/CCL/CNL 05/03/03 ANGLE AT TOP PERF: 91 @ 9970' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4-1/2" 5 '9150 - 9154 C 03!19/91 1-11/16" 4 10750 - 10830 C 05/03/03 1-11/16" 4 10890 - 11100 C 05/03/03 1-11/16" 4 9970 - 10400 C 05/03/03 *PERFS ARE BEHIND STRADDLE 7" LNR, 26#, 13CR, .0383 bpf, ID = 6.276" 9510' 2059' -j4-1/2" OTIS SSSV NIP, ID = 3.813" 2123' 4-1/2" X 3-1/2" XO, ID = 2.992" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3103 3037 0 MERLA DOME RA 16 05/14/03 4 5552 5486 1 MERLA SO RA 20 05/14/03 3 7221 7093 24 MERLA RA 2 8243 8018 26 MERLA RA 1 8335 8100 26 MERLA RA 8365' -13-1/2" PARKER SWS NIP, ID = 2.75" 8374' 9-5/8" TNV HBBP-R RET PKR, ID = 4.0" 8391' - 8393' TUBING PUNCH (04/16/09) 8405` - 8407` TUBING PUNCH (04/15/09) 8500' ESTIMATED TOP OF CEMENT (04/25/09) 9072' 3-1/2" OTIS XA SLD SLV, ID = 2.75" 9108' - 9110''-jTUBING PUNCH (04/17/09) I 9139' BLAST JOINT, ID = 2.992" 9148' BKR LNR TOP PKR, ID = 1.73" (10/30/06) 9154' 2.7" BKR DEPLOYMENT SLV, ID = 2.25" 9165' 7" TIW HBBP PERM PKR 9185' 3-1/2" PARKER SWS NIP, ID=2.75" BEHIND 9192' 3-1/2" PARKER SWS NIP, ID = 2.75" CT LINER 9196' 3-1/2" WLEG, ID = 2.992" MILLOUT WINDOW (F-45A) 9250' - 9256' 11137' I-I PBTD 2-3/8" LNR, 4.7#, L-80, :0039 bpf, ID = 1.995" ~ 11151' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNff 03/19/91 ORIGINAL COMPLETION 03/01/09 MV/PJC SET EZ CIBP (02/23/09) WELL: F-45A 05/05/03 DAV/KK CTD SIDETRACK (F-45A) 04/27/09 MV/PJC CMT RET &TBG PUNCH (04/15-1 7 9) PERMff No: r2030460 05/14/03 JCMITLH GLV C/O 04/27/09 JGM/PJC TOP OF CEMENT (04/25/09) API No: 50-029-22142-01 01/16/06 COM/PA WA V ER SFTY NOTE DELETED 05/04/09 RRD/PJC SET WHIPSTOCK (04/27/09) SEC 2, T11 N, R13E, 2180' FSL & 2196' FEL 09/28/06 CAZ/PA MAX ANGLE CORRECTION 10/30/06 DBM/PAG C/O LNR TOPPKR@ 9148' BP Exploration (Alaska) 04/27/09 ,<. -A Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth WP_II _Inh fk NO. , , r , x . ~, . -~ s ; ~ ~ ~ ~, Company: State of Alaska e .~4~ ' gtir/~ - '. ~ ~v:/ Alaska Oil & Gas Cons Comm v iw. s:. r ~..~. - Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~ .... n..~__s_•:__ F-45A AP3O-00033 ---~ ~ RST GRAVEL PACK LOG 04/17/09 1 VVIVI VV 1 P2-07 AVYO-00023 PRODUCTION PROFILE _ 9 04/05/09 1 1 11-12 AYQO-00019 USIT L - S ~ 04/19/09 1 1 X-05 AYTO-00010 USIT % ~1~5 04/03/09 1 1 X-01 AZ4D-00012 PRODUCTION PROFILE - (? 03/18/09 1 f Z-21A AP3O-00022 RST 02/24/09 1 1 E-34L1 AYTU-00010 OH LDWG EDIT (IFLEX) 02/08/09 1 1 L-106 22026 OH LDWG EDIT (REDO) 01/10/02 1 MPF-96 09AKA0039 OH MWD/LWD EDIT ~ 02/23/09 2 1 F-19A 40018664 OH MWD/LWD EDIT 02/14/09 2 1 F-18A 09AKA0034 OH MWD/LWD EDIT 03/16/09 2 1 06-23C 12066550 MCNL ~ 09/14/08 1 1 03-148 BIJJ-00005 MCNL - 03/30/09 1 1 11-18 BOCV-00006 RST -- ~ 1 03/02/09 1 1 07-20B AWJB-00028 MCNL ~ 02/27/09 1 1 MPB-22A AXBD-00005 CH EDIT PDC-GR (CBL) 12/23/08 1 07-29D AXBD-00016 MCNL ~ ~ ~ 03/17/09 1 1 09-33A AWJI-00019 MCNL - 04/01/09 1 1 DI GAeC 11 /~VGI/~\RII cr~i+r w BP Exploration (Alaska) Inc. _ ~ ......'~, v...,,,'M v,~ vvr , ~^v„ , v. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: • • 02(24/09 $Ci~'~~II~GI-~pi~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wpu ~,.ti N0. 5109 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 MPS-43 AZCM-00001 FMI vale 12/29/08 n~ co~or 1 CD 1 P2-41 AWL9-00009 SCMT - 01/01/09 1 1 MPS-43 AZCM-00001 SONIC SCANNER _( 12/29/09 1 1 S-26 AYTU-00014 PRODUCTION PROFILE ~ ~ - (~-~_ ` 02/16/09 1 1 F-45A AYLF-00018 LDL ~03- (3G j(0 `/,~.~~ 02/24/09 1 1 4-04lT-26 12083416 MEM LDL - 02/21/09 1 1 09-34A A24D-00005 USIT - ~- L( 02/07/09 1 1 W-218 11968975 USIT (REVISED) ~ ~.L.( 12/11/08 1 1 L2-18A 11999063 RST ( 11/29/08 1 1 L2-33 11999065 RST - L( 12/07/08 1 1 4-10A/L-28 12017518 RST - 09/26/08 1 1 W-218 11968975 CH EDIT PDC GR (USIT) 12/11/08 1 PLEASE ACKNOWLEDGE RE CEIPT BY SIGNI NG nNn aFTnwwun Holt rnov oeru T.,. "°""`°" BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Stree~~t3~i 00 Anchorage, AK 995~3~8 ATTN: Beth Received by: C . ~I~IR1~LS 111 r ~f~~~L r `J ~~If'u~ ALASRiA. OIE A1~TD GA5 CO1~T5ERQATIOI~T COMDII55IO1~T John McMullen Engineering Team Leader „ BP Exploration Alaska Inc. ~°~ ~~-~~ ~ ?.Q~~ PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, F-45A Sundry Number: 308-425 Dear Mr. McMullen: SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 700 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 ~i Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this ~ day of December, 2008 Encl. VI - ~0~ STATE OF ALASKA rviti ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25280 /~8 ~V 1. Type of Request: ®Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension;.... ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well A~ , " ^ Change Approved Program ^ Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other iV 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 203-046 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22142-01-00- 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: F-45A Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ADL 028280 ~ 65.71' ~ Prudhoe Bay Field / Prudhoe Bay Pool 12. PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11151' ~ 9043' 11137' ~ 9043' ~ None None in en th iz MD TVD Bu II se tructural r 1 11 1 ' Surfa e 2 4' 1 -3/8" 2664' 264' 4 0 2270 Intermediat 71 - / " 8710' 8502' 870 4 60 r in Lin r 8 4' 7" 842 ' - 92 0' 824 ' - 8971' 1 7020 finer 2 6' 2- / " 145' - 11151' 8 4' - 3' 112 11780 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9970' - 11100' 9046' - 9044' 4-1/2", 12.6# x 3-1/2", 9.2# L-80 9196' Packers and SSSV Type: 9-5/8"TIW 'HBBP-R' packer; Packers and SSSV MD (ft): 8374'; 7" TIW 'HBBP' packer 9165' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: February 1, 2009 ^ Oil ^ Gas ^ Plugged ®Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that the f regoing is true and correct to the best of my knowledge. Contact Mel Rixse, 564-5620 Printed Name John Mul Title Engineering Team Leader Prepared By Name/Number: Signature Phone 564-4711 Date (~ ~ d8 Terrie Hubble, 564-4628 Commission Use Onl Sundry Number: Conditions of approval: Notify Commission so that a representative may witness 1 ~p1..~C•~Z®.~~t~ ~~ 5 ~ ~ ^ Plug Integrity 'BOP Test ^ Mechanical Integrity Test ^ Location Clearance ~ _ ~c, _ ~ ~ ~ ~ ~ ~- Other: ~~~~3 ~S~ ~~~-'~'C`c~~- Subsequent Form Required: ~--`~j APPROVED BY ~ Z I Z A roved B ~ COMMISSIONER THE COMMISSION Date ,V Form 10-403 Rued 06/2006 -°~ ~ z ••, , i r Submit In Duplicate ° ti ~ ~a:; ~ i ~~ L ~ ~ ~ ~ ` ~ ;F 2DOt3 To: Tom Maunder ,~ Petroleum Engineer j~l~ ~~ Alaska Oil & Gas Conservation Commission From: Mel Rixse CTD Engineer Date: November 20, 2008 Re: F-45A Perforation Abandonment and new CTD Sidetrack Sundry Approval Request Sundry approval is requested for F-45A. Isolation of the existing perforations with a CIBP (cast iron bridge plug) followed by a new coil tubing drilling sidetrack is proposed. The CTD side track will target the Zone 1 A sands in an offset fault block to the east. 1,200' of perforations in the Zone 1 A sands is anticipated. WELL CURRENT HISTORY AND STATUS: The original well, F-45, was a conventional Z2A producer drilled in 1991 targeting the south central GD portion of F-Pad, and then completed with cemented 7" liner, and 4-1/2" x 3-1/2" tubing. No loss of returns were encountered during drilling. It was initially perforated in a straddled 26P lens and at the base of the 21 P, which flowed at 2700 bopd, 1100 GOR. The well flowed full time until 1993, when cycling for high GOR became necessary. Perforations were added in 1993, and again in 1996, both times with no appreciable benefit. The original well produced 2.7 MMbo (SLP) until 2003 when it was abandoned for a sidetrack option. The first sidetrack, F-45A, was drilled in 2003. The sidetrack procedure included setting a cement plug in the original wellbore from TD up to 9200', with all perforations to be closed behind cement. The new wellbore was drilled, with a kickoff point at 9250. F-45A, also a Z2A producer, was completed with 2-3/8" liner from 9148', to TD of the new wellbore at 11151'. The liner was set in the original 3-1/2" production tubing. F-45A came online, fulltime, in May 2003 with an initial rate of 1400 bpd at 1800 GOR. The well began to cycle in early 2004 when production dipped to 600 bpd at 40,000 GOR. The well cycled regularly until late 2006 when GOR increased above marginal to 70,000 GOR. Attempts to cycle continued throughout 2006 and 2007, however on time over the past two years has been 33%; with the last 1 year at 23%. Production rates have stabilized at approximately 500 bpd. The well produced 20 mmscfd from the beginning, leading to speculation about a liner top packer being improperly set. In July 2006, a Production Log was ran to verify the leaky packer. There was an attempt to lower gas rates by pulling and resetting the liner top packer in October 2006. Additionally perfs were added in 2006 between 9550' - 9600'. GOR did not decrease after the above well work. Original production estimates for F-45A have proven conservative. F-45A was expected to produce 521,000 barrels over its life; to date F-45A has produced over 600,000 barrels. REASON FOR SUNDRY AND SIDETRACK: F-45A has seen its % on time decrease significantly over the past two years. For 2008, F-45A has been online only 15% of the time. The well shows little healing, even after extended periods of being shut in. It is anticipated that F-45A's on time will decrease even further as the "healed" GOR's remain above 50,000. Pre-Rig Operations (Scheduled to begin on February 1, 2009) 1. O MIT-IA - to 3000psi on 2. O MIT-OA - 2000 psi 3. S Dummy all GLV, Open sliding sleeve 4. S Slickline Drift -Drifted to 9148' with 3-1/2" Monobore Dummy WS 5. S Slickline Drift 2-3/8" for CIBP 6. E Set CIBP (Cast Iron Bridge Plug) C«~ 9130' 7. E Set whipstock at 9100' MD 8. O Test infectivity through sliding sleeve 9072' MD to perforations in 7" liner at 9139' MD. 9. C Bullhead cement through tubing sliding sleeve to perforations in 7" liner at 9139' MD. 10. O AC-LDS; AC-PPPOT-IC, T 11. O PT tree (MV,SV,WV), function LDS 12. 13. O O Bleed gas lift and production flowlines down to zero and blind flange Remove S-Riser, Remove wellhouse, level pad -Complete ~ ~\ ~ ~~~~e-y~~~``p~ Rig Sidetrack Operations: (Scheduled to begin on March 1, 2009) 1. NU 7-1/16" CT Drilling BOPE and test to 250 psi low and 3500 psi high 2. Pull BPV. ill 2.74" window through 3-1/2" tubing and 7" liner at 9100' MD. 4. Drill build/turn section with 3" bicenter bit, and land well. 5. Drill lateral section to 11,576' MD w/ resistivity log. 6. Run 2-3/8" solid liner w/cementralizers to TD. Place liner top at 8800' MD. 7. Cement liner from TD to TOL (8800'MD) with 15.8ppb cement. 8. Clean out liner/Run MCNVGR/CCL log. 9. Test liner lap to 2000 psi. 10. Perforate per geologist. 11. Set liner top packer (if fails liner lap test) 12. Freeze protect well to 2500' with methanol. 13. Set BPV. ND 7-1/16" stack. FP tree and PT tree cap to 3500 psi. 14. RDMO Nordic 1. Post Rig: 1. Re-install wellhouse and FL's 2. Pull BPV 3. Install GLV 4. RU test separator, flow test well. ~,.,~ , Mel Rixee CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble sF~AD = BATOR= ~~/_ .. REV ._.. _ ~ a-1rr TBG 12.81, L-80, .0152 fir, D= s.858' TOP OF 31n' TBG 133(8" ~,, 888. L-~. D= 12.415' F-45A I 2684' I Minimum ID = 1.73" ~ 9148' BKR LINER TOP P/1CKER TOP ~ 7' LNR 31n• R0.RKf3i stns NR; D = z.75• I 9~5t8' TNVHBBP•R RET PKR D = 4.0' 131 n' 0718 XA SLIDNG SLEEltt; D = 2.75' I 9139' Fi eLASr ,IOrrr, D = z.esz• 9148' HBKRLNRTDPPKfi,iD=1.73•(10/9010A 9154' 2.7' BKR DF3~I.0YMF3dT SLV, D= 228' 91 ~' ' 7' TIW HAP PF]aM PKR (Bf3iiV0 CT LN 9185' 31n' R4RKF3i 9YIS NP, D= 2.75' (8E M Y9' H 317 PM 18(61 9Nf8 11aP D = 2.75' f 8f ~~ PERFORATION SUMNMRY R~ I.OLi SYV3 MFa1 C/CNL OSl03/03 ANCiIEATTOPPEAF: 91 ®9970' Note: fiefs to Producti~ DO for historical Parr dab 52E fYTEliVAL Opn/Sgz DATE F~5 4-1 f!' S '9150 -9154 C 03/19/91 F'45A 1-11!18' 4 9970-10400 O OSl03J03 1-11H6' 4 10730-10830 O OSRq/D3 1-11/16• 4 10890-11100 0 05103103 I 'P0~MiB~iF~{W6B * 8.270' SAFETY NOTES: "' 7= CF~BiOME LNR. Tiw PKRS MAY FAiI IF MORE THAN 2100 P81 ~RREitENT1AL PRBSSUREI8 ®CCEEDEQ ""` 1 zo59' p-{4-vr ors sssv Nw, D= 3.at3• 2123' 4-tn•X31n•X0 oas LIFT MANOREL.S ,r MD TVD DLa/ TYPE VLV LATCH PORT d1 i 3103 3037 0 MERLA GONE RA 18 05/1 4 5552 5488 1 MERLA SO RA 20 05N~ 3 7221 7093 24 MFFLA RA 2 8243 8018 28 MF3irA RA 1 8335 8100 26 MERI.A RA I 9,98' I-{3,n"WLBC(Bt3iNDC'fLNFi~ ( f3.MD TT Nor Loocs® CEMENT RAMPtfifMDOW 9254' -8259' 1318' LNG 4.78, L-80, .0038 Ytrr. ID=1.886' CI PRUGHOE BAT UNtT 11iRiL: F48A fB~NT Ne: `l03048rt API No: 50~~2214Z-01 11N, Rt31E 21fJt1' FSL i 2188' FfB. ~ MgIMaeMn yltaeka, DA OOAMYB~-tS DOTE REI/ BY ! 1/!i 0lr~lAL C Oi103r03 MYAB( CTf3 OE/f4103 JCAIItTIH GLV C/0 01/18106 tfltltM 9 E ffr® 08128106 MAX ANGLE ACTION 10150106 DBA41P/1 GOINR P 8148' ~D= FMC ~ OT6 ~ ~~ ~ ~ SAFETY NOTES: "' 7" CHROME LNR. TIW PKRS = 85.77' MAY FAIL IF MORE THAN 2100 PSI dFFERENTIAL 37'95 PRESSUREI9 EXCEEDED. "' 41R' TBG, 12.61, L-80, .0152 bpf, D= 3.958' TOPOF 3.12' TBG OTIS SSSV NP, D = 3.873' 4 5552 5488 1 MERLA SO RA 20 3 7221 7093 24 MERLA RA 2 8243 8018 28 MERLA RA 7 8335 8100 28 MERLA RA Minimum ID = 1.73" (~ 9148' BKR LINER TOP PACKER 3111' PNRKBt SWS NP D = 2.75' 9.518' TNV HBBRR RET PKR D ^ 4.0' of 11376' I--ITD 3' Open Hole CIBP T JOINT, D = 2.992' RM PKR (BB-IND CT l D= 2.75' (BEHND CT SWS ELMO TT NOT L000® CEMENT RAMPINNOOYV 9250'- 9256' ~~r 2-3/6' LNR, 4.1t, L-60, .0039 bpl, 10 ^ 1.995' 11151' PRUDFIOE BAY UNR YVEIL: F45A PERhMT No:'I030460 API Ne: 50.029.22142-01 BP Eaplentlon (Alsska) • • .~: _ MICROFILMED 03/01/2008 DO NOT PLACE ..~ . ~..~ ~~- ~_ r .: ANY NEW MATERIAL UNDER THIS PAGE F:\I.aserFiche\CvrPgs_Inserts\Microfilm Marker.doc . . RECEIVED WELL LOG TRANSMITTAL AUG 2 9 Z006 I " ()' " "'>' ("'I'; cl\!!\mission :\nSr,;'~ "' '.-" t;,) ,/.n '" ¡\nchO[()qe ProActive Diagnostic Services, Inc. To: AOGCC Records DepaHAnent 333 W. 7th Ave Suite 100 Anchorage. Alaska 99501 RE: Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper / MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8951 1 BL / EDE Disk F - 45A Production profile 02..Jul-06 1) 2) 3) 4) 5) 6) 7) ~<tANNED AUG 30 2006 Signed: (2)1- Date: '3 /m/'J~ f I Print Name: 1~...1Lr~J~u:l2- (1/1 (\..iAAJO-pÁ/\.- PROAcTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATlONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE : WWW.MEMORYLOG.COM D:IOO ]DSANC-2006\Z _ W ordlDislributionITraru;mittal_ SheetslTt1IßsmiUJriginal.doc <'iJ D3 -OL{ to tf 140159 . . WELL LOG TRANSMITTAL RECEIVED AUG 2 9 2006 4Iæka Oil & Gas Cons. Commission Anchorage ProActive Diagnostic Services, Inc. To: AOGCC Records Department 333 W. 7th Ave Suite 1 00 Anchorage, Alaska 99501 RE: Cased Hole/Open Hole/Mechanical Logs and / or Tubing Inspection[Caliper / MTI] The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8951 1 ] EDE Disk F - 45A 2] 3] 4] 5] 6] 7] 02-Jul-06 Coil Flag $ÇANNED AUG 3 0 2005 Signed: C/£k Qttr 'ìo:J-\ IA () / óh úiklA,l7-e t"\ Date: f5!r)O¡! ð0 Print Name: PRoAcTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-88952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE : WWW.MEMORYLOG.COM {)C53-CfltD ~ /'/D7(( C:\Documenls and SettingsIPDS Anchorage - MPLlDeskloplTransmitJJriginal.doc ç Jur'~ DATA SUBMITTAL COMPLIANCE REPORT 6/27/2005 Permit to Drill 2030460 Well Name/No. PRUDHOE BAY UNIT F-45A MD 1115V TVD 9043.-' Completion Date 5/5/2003./ Completion Status 1-01L REQUIRED INFORMATION Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ~Tf ~ ~- Log Log Run Scale Media No 12146 LIS Verification Neutron 2 Casing collar locator 2 ED D,.Pdf' ASL{1 Y.(..-xlDirectional Survey Rpt ~ Lis Þe- Rpt ~·C Pds Directional Survey 12348 Gamma Ray Gamma Ray Gamma Ray 12348 Gamma Ray Well Cores/Samples Information: Name Interval Start Stop Sent ;'p~J :2? I1r ~.~ API No. 50-029-22142-01-00 Operator BP EXPLORATION (ALASKA) INC Current Status 1-01L UIC N ------------- Directional surv~ ye0__ ~____ ----- (data taken from Logs Portion of Master Well Data Maint) ~ Interval OH / Start Stop CH Received Comments Blu 8978 11134 Case 9/20/2003 Compensated Neutron Log - Memory GRlCCUCNL 8978 11134 Case 9/20/2003 Compensated Neutron Log - Memory GRlCCUCNL 8978 11134 Case 9/20/2003 Compensated Neutron Log - Memory GRlCCUCNL 9250 11151 9/16/2003 9250 11151 9/16/2003 9250 11151 Open 1/9/2004 Gamma Ray - MWD ~'- 9250 11151 Open 1/9/2004 Gamma Ray - MWD 9250 11151 Open 1/9/2004 Gamma Ray - MWD 9250 11151 Open 1/9/2004 Gamma Ray - MWD ------- Sample Set Received Number Comments Blu Blu Permit to Drill 2030460 MD 11151 TVD 9043 ADDITIONAL INFORMATION Well Cored? Y ® Chips Received? ...- Y / N Analysis '!...J,.ÞY Received? Comments: Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 6/27/2005 Well Name/No. PRUDHOE BAY UNIT F-45A Operator BP EXPLORATION (ALASKA) INC Completion Date 5/5/2003 Completion Status 1-01L Current Status 1-01L Daily History Received? G)N ~N Formation Tops ~ Date: API No. 50-029-22142-01-00 UIC N --------~ -- ----"--- JI J ^ ) - .=.::-...::::.=-~~-~ / ~ v/v+-~__> g) C)3 --0 ~l (0 Transmittal Form ".. BAKER HUGHES INTEQ Anchorage GEOScience Center To: AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 Attention: Lisa Weepie Reference: F -45A '! Contains the following: II !! ¡ ! II I 1 LDWG Compact Disc 133l.\ ~ (Includes Graphic Image files) 1 LDWG lister summary 1 blueline - GR/Directional Measured Depth Log 1 blueline - GR/Directional TVD Log , LAC J ob#: 468898 I; Sent By: Glen Borel Received B~ \~ ~ \.~I'YY\. Date: ~œìvED", ·:1"';:" .;.~,.,. ,n.., . .~ :~"~, ..,1,:..:ci,,~,;,~.,.. . l,:·,....r::· . 1". .Ii) Alaska Oil & Gas Cons. commisio()l<J,::, PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RE~NG '{j!¡:¡ii OR FAXING YOUR COPY . !~:;i' FAX: (907) 267-6623 ~¡,;,~G~f"I' :~""~'. Date: " ".''\ ~ '." 0 ('. .,' \ 'i, . " J 1~0\¡L.( ~..".' ... . ./ Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 _ u'" hun___...__ I .--.~-----------< 1!TU7k.\C·I:III-:«·IlJ.i'~ __u.···__··____..··,"_"_.._...,,.. - - --- ... ., ....... . ., , -, a. .. -... -- ... ...- ." ., ..... ------------------- _"""I _'Z' .. .1 .,.. .-......... ...,....- -- -.......,....' ~2fsFi _._._-._-_...-.....,.'..._..,..-~..,...._...~..-.. :.'''''''. ......"..... I I"""'" 1'.1 11-:1·· I:i ,.....,.... ii -,~ ,:¿ (d :;tt·- .1 .¡ ""! ,I ----,-- ...-,.-.-.-.-...'.. ----_._._.-_.._--,-~-_..,_. SCblUJDbepgep Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth 09/16/03 NO. 2959 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job# Log Description 23318 MCNL 23404 MCNL 23347 MCNL 23401 MCNL 23308 MCNL 23399 MCNL 23420 MCNL 23426 MCNL 23276 RST Color Date Blueline Prints CD 05/15/03 1 1 fß1~f 06/26/03 1 1 OS/22/03 1 1 If&J t'Jj ~ 06/12/03 1 1 05/03/03 1 1 ~v~ 06/23/03 1 1 08/08/03 1 1 07/19/03 1 1 04/04/03 1 1 };q. } ) ~. PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TIN: Beth -= r- ff""\ ¡¡o- ! \ I ¡;: D ~-{ t \..; t: ~ ~J I- SrD ? ,". 2Jì!","2. t-; : J ¡ -! ':v L.. ..... '... ...1 V Received b~G Q ^I\~ ~ 0 C"t ~ C'/V\ Alaska 0;'; & Ga3 Cons. Commission AnchOíage { STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well ~ Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3098' SNL, 2196' WEL, SEC. 02, T11N, R13E, UM At top of productive interval 4105' SNL, 1383' WEL, SEC. 02, T11 N, R13E, UM X = 653485, Y = 5972725 10. Well Number At total depth 3283' SNL, 2039' WEL, SEC. 02, T11 N, R13E, UM X = 652811, Y = 5973534 11. Field and Pool 5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE = 65.71' ADL 028280 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 4/27/2003 5/1/2003 5/5/2003 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 11151 9043 FT 11137 9043 FT 181 Yes 0 No 22. Type Electric or Other Logs Run MWD, eeL, GR, MCNL 23. CASING SIZE CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE Surface 110' Surface 2664' Surface 8710' 8426' 9250' 9145' 11151' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) May 20,2003 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE 5/25/2003 4 TEST PERIOD 1,298 9,775 53 1760 Flow Tubing Casing Pressure CALCULATED OIL-BBL GAs-McF WATER-BBL OIL GRAVITy-API (CORR) Press. 1112 24-HoUR RATE 22.3 CORE DATA Rf~"(~E "/E'f)" Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas .or water. .'. S. u~roi~. If? ore chips. """"" .~, " j\tyW /1 ß:\:{J JUN ~n1~~ DXf\~ ;\ ,~~ '- ,"': 0 2 2003 \ "'-"t'.?) - I I \."t ø \9 / 1:1S~ Alaska Oil & Gas Cons. Commi:¡sion WT. PER FT. GRADE 20" 13-3/8" 68# L-80 9-5/8" 47# NT80-S 7" 26# NT13Cr80 2-3/8" 4.7# L-80 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 1-11/16" Gun Diameter, 4 spf MD TVD 9970' - 1 0400' 9046' - 9049' 10750' - 10830' 9040' - 9040' 10890' - 11100' 9045' - 9044' MD TVD 28. No core samples were taken. Form 10-407 Rev. 07-01-80 Classification of Service Well 7. Permit Number 203-046 8. API Number 50- 029-22142-01 9. Unit or Lease Name X = 652650, Y = 5973714 Prudhoe Bay Unit F-45A 15. Water depth, if offshore 16. No. of Completions N/ A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost (Nipple) 2059' MD 1900' (Approx.) CEMENTING RECORD AMOUNT PULLED 17 -1/2" 3723 cu ft Permafrost 12-1/4" 1746 cu ft Class 'GI 8-1/2" 300 cu ft Permafrost 3" 67 cu ft Class 'G' 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2", 12.6#, L-80 2123' 3-1/2",9.2#, L-80 9196' 8374' & 9165' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 2000' Freeze Protected with MeOH GAS-OIL RATIO 7,529 UR'G\NAL Submit In Duplicate ( ( 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 22N 9251' 8971' 22P 9253' 8973' 21N 9306' 9008' 21P 9312' 9011' RECE~VED JUN n 2 7003 31. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble ~J\J\i.J¿ _ ~ Title Technical Assistant Date 0 Co - 03 -03 F-45A 203-046 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer: Mary Endacott, 564-4388 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. I,"EM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. :~t '\¡GII~AL Form 10-407 Rev. 07-01-80 ( ( BP EXPLORATION Operations Summary Report Page 1 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-45 F-45 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 4/23/2003 Rig Release: 5/5/2003 Rig Number: N2 Spud Date: 4/25/2003 End: 5/5/2003 Date From - To Hours Task Code NPT Phase Descri ption of Operations 4/24/2003 09:30 - 14:00 4.50 MOB P PRE Hold PJSM with crews and Security. Begin rig move to F-45. 14:00 - 15:00 1.00 RIGU P PRE Arrive on F pad. Wait on pad prep. While waiting, install e line reel in CTU. 15:00 - 16:00 1.00 MOB P PRE PJSM prior to moving over well. 16:00 - 17:00 1.00 MOB P PRE Move over well F-45. 17:00 - 17:20 0.33 RIGU P PRE Nipple down tree cap. Prepare to nipple up stack. 17:20 - 18:20 1.00 RIGU N RREP PRE Burst a 1" hydraulic hose on bridge crane in loft area. Significant release of hydraulic fluid. Fluids from leak captured within rig. 18:20 - 18:55 0.58 RIGU P PRE Safety meeting to discuss resolution of hydraulic leak, cleanup, and impact on operations and safety, while moving operations forward. RU operations suspended until leak is cleaned up and a safe rigup can be performed. (Slipping hazards). 18:55 - 00:00 5.08 RIGU N RREP PRE Continue with cleanup operations from hydraulic fluid spill in rig. Order more hydraulic fluid from Coleville. Order more absorbant and oily waste bags from drilling tool service. Estimated volume of leak within rig was 100 gallons. All leaked fluid was contained within the rig. Note - No hydraulic oil made it to the ground. 4/25/2003 00:00 - 04:30 4.50 BOPSURP PRE Resume nippling up stack. Continue rigging up. Position geo trailor and BHI trailor. Weld modifications to cuttings tank. Problem with OA pressure monitor trying to rig it up in close proximity to rig mat. Suggest changes be made for future rig ups. Rig mat not needed in this position. Accept the rig at 00:00. 04:30 - 05:00 0.50 BOPSUR P PRE Safety meeting prior to begining BOP test. 05:00 - 10:00 5.00 BOPSURP PRE Begin initial BOP test. Witness waived by State of Alaska AOGCC, Chuck Sheve. Tested inner/outter stack and HeR valves, upper/lower pipe slip rams, blind rams and choke manifold valves to 3500 psi/5 min & 250 psi/5 min. Annular to 2500 psi. Perform accumulator draw down test. Make-up BHA #1 on catwalk. 10:00 - 11 :00 1.00 RIGU P WEXIT Secure injector to blocks and 3 point to rig floor to stab coil to injector. Prep tugger line to coil. 11:00-11:15 0.25 RIGU P WEXIT PJSM review procedures for stabbing coil. 11: 15 - 12:30 1.25 RIGU P WEXIT Stab coil to injector. Install Kendal CTC and pull test to 30k. 12:30 - 15:30 3.00 STWHIP P WEXIT Install BHI wet connect. Test cables, failed short in reel box. Repair and re-test. PT CTC to 3400 psi. Install lubricator cap and bleed off 50 psi from well. 15:30 -16:00 0.50 STWHIP P WEXIT P/U BHA #1. 16:00 - 18:00 2.00 STWHIP P WEXIT RIH and displace MeOH from coil and wellbore. 18:00 -18:15 0.25 STWHIP P WEXIT Log tie in over gamma character at 9030', make -3' correction. 18:15 - 19:00 0.75 STWHIP P WEXIT Kick on pumps. Free spin 2000 psi at 1.6 bpm. RIH, tag cement at 9200', same depth as left by service CT unit. Begin milling. Making 30 fph. Milling 1.6/1.6/2250 psi. IAP=387 psi, OAP=22 psi. 19:00 - 20:10 1.17 STWHIP P WEXIT 9220', ROP down to 20 fph, drilling good hard cement. Adding bio to active pits to compensate for dilution from seawater in wellbore. Pumping 10 bbl sweeps of gelled up KCL every 50 bbls while drilling. 20:10 - 20:30 0.33 STWHIP P WEXIT 9242', ROP 20 fph, good hard cement. This cement is Printed: 5/5/2003 11 :28:20 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ~' I ( BP EXPLORATION Operations Summary Report Page 2 of 8 F-45 F-45 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 4/23/2003 Rig Release: 5/5/2003 Rig Number: N2 Spud Date: 4/25/2003 End: 5/5/2003 Date From - To Hours Task Code NPT Phase Description of Operations 4/25/2003 20:10 - 20:30 0.33 STWHIP P WEXIT adiquate to do a cement ramp. Orient to high side. Continue milling cement ramp, TF=O deg, straight up. (Coil track is wonderful!). 20:30 - 20:40 0.17 STWHIP P WEXIT 9250', Stop ramp. No significant erratic tool faces indicating contact with casing. PUH slowly, while waiting on last sweep to get to mill. 20:40 - 22:25 1.75 STWHIP P WEXIT POOH, chasing last sweep to clean hole. Paint tie in flag at 8900' EOP on way out of hole. 22:25 - 23:00 0.58 STWHIP P WEXIT Tag up at surface, stand back injector. Lay down pilot mill and 1.75 deg motor. PU 2.5 deg motor and 1 step window mill. Scribe same. 23:00 - 00:00 1.00 STWHIP P WEXIT RIH with BHA #2 to mill window off of cement ramp. 4/26/2003 00:00 - 00:55 0.92 STWHIP P WEXIT Continue RIH with Window milling BHA #2. Set down while RIH at 7226', 8243', 8365'. Oriented tool to get free. Note motor not spinning at tag ups. Make -8' correction at flag. Stop at 9040'. 00:55 - 01:10 0.25 STWHIP P WEXIT Make tie in pass down with EDC open and pumping .6 bpm. Log down at 180 fph. Make +2' correction. 01:10-04:30 3.33 STWHIP P WEXIT RIH, dry tag 9252.4'. PU at 31 klbs, kick on pumps. Orient to high side. Kick on pumps. Free spin 2100 at 1.5 bpm. Flag pipe with odometer = 9250.4'. PU 1'. Begin time milling process from 9249.4' according to schedule in proceedure. 04:30 - 12:00 7.50 STWHIP P WEXIT Back at 9250.4', start depth at top of window. Good character on motor work, WOB, etc. All indications look good. Continue milling window to 9256'. 1.5/1.5/2400 psi. IAP=420 psi, OAP= 10 psi. 12:00 - 12:35 0.58 STWHIP P WEXIT Drill formation f/ 9256' to 9265'. 12:35 - 14:30 1.92 STWHIP P WEXIT TOH (PJSM for next BHA change) Standback injector. 14:30 -15:00 0.50 STWHIP P WEXIT Change out motor back to 1.75 deg and p/u Crayola mill. 15:00 - 16:45 1.75 STWHIP N WEXIT RIH tagged up on nipple at 8365' w/ 2.75" ID. 16:45 - 18:00 1.25 STWHIP N WEXIT TOH. 18:00 - 18:20 0.33 STWHIP N WEXIT Tag up at surface, change out mills, 18:20 - 20:00 1.67 STWHIP N WEXIT RIH with BHA #4, 1.75 deg motor, 2.74" cutrite only crayola mill. 20:00 - 20: 15 0.25 STWHIP P WEXIT Slick RIH, no hang ups while running in. Tie in at 8900' EOP flag, make -6' correction. Confirm tie in at gamma spike at 9040'. 20:15 - 20:50 0.58 STWHIP P WEXIT Kick on pumps, begining swap to mud. RIH slowly, pumps on to 0.75 bpm. Tag up at top of the window at 9249.8', kick pumps up to 1.5 bpm, 2020 psi. Holding TF =0 deg. Try to ream down. Stalling at top of window. 20:50 - 22:50 2.00 STWHIP P WEXIT Mud to bit. Free spin 1.73, 3000 psi. Continue milling. Stalling at 9250.7', about a foot down into the window. Had to work down slowly, but finally made it thru. Several stalls at 9257', probably bottom of window. Setting down at 9260', 4' out in open hole. 22:50 - 00:00 1.17 STWHIP P WEXIT Backream back up thru window at 90R, and 90L. 4/27/2003 00:00 - 00: 1 0 0.17 STWHIP P WEXIT Dry drift window. Made it down slick with 0 deg TF. 00: 10 - 00:20 0.17 STWHIP P WEXIT Log tie in to check depth, Make +2' correction. 00:20 - 01 : 15 0.92 STWHIP P WEXIT POOH for drilling BHA. Refresh EOP flag at 8900' EOP. 01:15-01:35 0.33 STWHIP P WEXIT Pre spud and PJSM safety meeting while continuing to POH. 01 :35 - 01 :50 0.25 STWHIP P WEXIT Continue to POH. 01 :50 - 02:25 0.58 STWHIP P WEXIT Tag up at surface with BHA #4. Break off WF motor and Printed: 5/5/2003 11 :28:20 AM { ~. (" BP EXPLORATION Operations Summary Report Page 3 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-45 F-45 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 4/23/2003 Rig Release: 5/5/2003 Rig Number: N2 Spud Date: 4/25/2003 End: 5/5/2003 Date From - To Hours Task Code NPT Phase Description of Operations 4/27/2003 01 :50 - 02:25 0.58 STWHIP P WEXIT crayola mill. The mill gauges 2.65". Call WF for another crayola mill. None on the slope. Call Hughes for a diamond string mill in this OD. They don't make one. Rats. Call Baker for a crayola mill. They have one dressed with metal muncher buttons. I would prefer cutrite only, but call for it ASAP. While waiting for Baker, make an attempt with a drilling BHA and 2.70"x3" Hughes bit, to see if we can get thru window. 02:25 - 04:05 1.67 DRILL P PROD1 RIH with BHA #5, first drilling BHA. Stop at flag, subtract 10'. 04:05 - 04: 15 0.17 DRILL P PROD1 Log tie in pass down with pumps on, EDC open. Start at 9040' bit depth. Make a +2' correction. 04: 15 - 09:50 5.58 DRILL P PROD1 RIH, slick thru window. Tag up at 9262', pumps off. Kick on pumps. Free spin 2825 psi @ 1.5 bpm. Begin drilling. 1.5/1.5/3050 psi. ROP=25 fph. IAP=410 psi, OAP=O psi. Drilled to 9435'. Expected to drill to +/- 9515' but seeing more than expected DLS with this motor. No problems just need to reduce motor bend angle. 09:50 - 11:45 1.92 DRILL P PROD1 TOH Setback injector 11 :45 - 12:00 0.25 DRILL P PROD1 Inspect bit #5 (1-2-CT-G-X-I-No-BHA) Adjust AKO down to 1.5 deg. 12:00 - 13:25 1.42 DRILL P PROD1 RIH to 9140'. 13:25 - 13:40 0.25 DRILL P PROD1 Log tie in -5' correction. RIH to window. 13:40 - 15:40 2.00 DRILL P PROD1 Held Safety & Spill stand down. All crew members and contract personnel participated first as a group then pairing off and touring the rig. Followed with each person commenting on their most important HSE issue found. Everyone was very pleased with having the stand down. 15:40 - 15:55 0.25 DRILL P PROD1 RIH to bottom. No problems through window. 15:55 - 18:00 2.08 DRILL P PROD1 Directionally drill ahead f/ 9435' to 9456' Ran into what appears to be 1 st expected fault. Work through with repeated stalls. 1.5 bpm 2700 psi off-bottom 200-400 psi motor work. Continue drilling ahead. 18:00 - 18:20 0.33 DRILL P PROD1 9600', Wiper trip to shoe. Slick off bottom, no problems. 18:20 - 19:45 1.42 DRILL P PROD1 Resume drilling ahead. 1.65/1.7/3246 psi. Pit vol=294 bbls. IAP=425 psi, OAP=4 psi. ROP=80 fph. 19:45 - 20:10 0.42 DRILL P PROD1 9685', Drilling getting hard, and having problems getting weight to bit. Make wiper trip to shoe. Clean PU off bottom at 25 klbs. Smooth to shoe. 20: 1 0 - 22:40 2.50 DRILL P PROD1 Able to resume drilling ok. 1.6/1.6/3330 psi. Pit vol=292 bbls, ROP=95 fph. 22:40 - 23: 15 0.58 DRILL P PROD1 9850', Wiper trip to the shoe. 9klbs over pull off bottom. Clean to shoe from there. Pit vol =285 bbls. Lost 10 bbls since start of tour. 23:15 - 00:00 0.75 DRILL P PROD1 Continue drilling. Midnight depth=9883'. 4/28/2003 00:00 - 01 :05 1.08 DRILL P PROD1 Continue drilling turn section from 9883'. Drilling 1.6/1.6/3400 psi. Free spin 3000 psi. IAP=435 psi, OAP=5 psi. Pit vol=278 bbls. (We do not appear to be loosing fluid to formation. It looks as if we are loosing it over the shaker with cuttings, as well as hole volume being increased as we drill.) 01:05 - 01:15 0.17 DRILL N DPRB PROD1 9948', Drilled off then started getting sticky. Picked up to 9927', then got stuck. Still have 100% returns. Work pipe up and down to 60 klbs with no movement. Probably differentially stuck. Circulate for 10 minutes to fluff any cuttings up hole prior to trying the "relax" technique. Printed: 5/5/2003 11 :28:20 AM ( ( BP EXPLORATION Operations Summary Report Page 4 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-45 F-45 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 4/23/2003 Rig Release: 5/5/2003 Rig Number: N2 Spud Date: 4/25/2003 End: 5/5/2003 Date From - To Hours Task Code NPT Phase Description of Operations 4/28/2003 01: 15 - 01 :30 0.25 DRILL N DPRB PROD1 SI pumps, position pipe in neutral weight. Standby for 15 minutes. 01 :30 - 02:25 0.92 DRILL P PROD1 Pulled free at 60klbs. Wiper trip to shoe, 02:25 - 04:05 1.67 DRILL P PROD1 Back on bottom, resume drilling. 1.6/1.6/3360 psi. Free spin 3050 psi. Pit vol=277 bbls. ROP=96 fph. 04:05 - 04:30 0.42 DRILL P PROD1 10036', Wiper trip to window for safety stand down. 04:30 - 06:00 1.50 DRILL P PROD1 Open EDC at 9300', pull thru window. Circulate at minimum rate with trips set close. Hold safety stand down with all rig hands, geo, MWD, Co. Rep, Toolpusher. Discuss YTD spill and safety record. Discuss ways to mitigate current spate of incidents and spills. Conduct rig walk around with all hands to generate ideas for improvement in operations. Debrief after walk around with all hands. 06:00 - 07:40 1.67 DRILL P PROD1 TOH 07:40 - 08:05 0.42 DRILL P PROD1 Set back injector.. Pull BHA inspect bit. Will re-run. Adjust AKO motor to 1.1 deg. Check torque on all sevice breaks. 08:05 - 09:45 1.67 DRILL P PROD1 RIH at min rate. 09:45 - 10:00 0.25 DRILL P PROD1 Log tie-in -5' correction. 10:00 - 10:20 0.33 DRILL P PROD1 RIH to TOC slow run in speed. Through window 1 k drag. > pump rate to 1.1bpm RIH dwn wt 14k. 10:20 - 11 :30 1.17 DRILL P PROD1 Directionally drill ahead fl 10036' to 10160'. 11 :30 - 12: 15 0.75 DRILL P PROD1 Wiper trip to window. 12:15 -13:55 1.67 DRILL P PROD1 Directionally drill ahead fl 10160' to 10309' with short wiper trip after drilling 110' of this section. 1.6/1.6 3450 on bottom 3050 FS 2-3k WOB 100-120'/hr Hole acting good. 13:55 - 14:55 1.00 DRILL P PROD1 Wiper trip to window. 14:55 -17:10 2.25 DRILL P PROD1 Drill f/ 10309' to 10348'. 80 bbls into mud swap having problems with equalizer valves between #2 & 3 pits. Make a wiper trip while figuring out the problem. 1.681 1.68 FS = 3010 300-400 MW Continue drilling ahead to 10510' 17:10 - 18:25 1.25 DRILL P PROD1 Wiper trip. 18:25 - 20:00 1.58 DRILL P PROD1 10515', Resume drilling. 1.63/1.6/3340 psi. Pit vol=276 bbls and still taking on new mud thru coil. ROP=112 fph. Possibly crossed fault at 10604'. 20:00 - 21 :20 1.33 DRILL P PROD1 10630', wiper trip to shoe. 21 :20 - 21 :45 0.42 DRILL P PROD1 Resume drilling. 21 :45 - 22:15 0.50 DRILL P PROD1 10640', Short wiper to discuss plan forward. Possibly fault at 10604', now in a shale. Need to come up. Geo, DD, and Co Man about plan forward, ability to build, and if this motor can achieve the build needed to drill up out of the shale with enough MD to have adiquate perforations prior to TDing well. Decide to drill ahead 30' additional to see what builds we achieve with this motor. 22:15 - 23:00 0.75 DRILL P PROD1 Resume drilling. TF=O deg. Drilling at 1.6/1.613350 psi. Pit vol=267 bbls, ROP=92 fph. 23:00 - 00:00 1.00 DRILL P PROD1 10680', Crossed fault at 10604'. It dropped us down into the 14N shale. Geo reports that this could be the troublesome type of 14N; ie white hydrating clay type. Consult with mud man and geo. Decide to add maximum clayguard to system to stay ahead of clay. As fastest way to add to system, call for 50 bbls of new mud with clayguard already added. Continue drilling, Printed: 5/5/2003 11 :28:20 AM (: f BP EXPLORATION Operations Summary Report Page 5 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-45 F-45 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 4/23/2003 Rig Release: 5/5/2003 Rig Number: N2 Spud Date: 4/25/2003 End: 5/5/2003 Date From - To Hours Task Code NPT Phase Description of Operations 4/28/2003 23:00 - 00:00 1.00 DRILL P PROD1 Midnight depth=1 0730'. 4/29/2003 00:00 - 00:20 0.33 DRILL P PROD1 10730', continue drilling ahead lateral section. 00:20 - 02:05 1.75 DRILL P PROD1 Wiper trip to shoe. Clean PU off bottom, and up thru shale 10680'-10606'. While RIH, set down hard, then fell thru at 10690'. (Bottom of 14N shale. And so it begins....) 02:05 - 03:30 1.42 DRILL P PROD1 Resume drilling. Free spin=3050 psi. Drilling at 1.6/1.6/3440 psi. Pit vol=255 bbls. ROP=80 fph. 03:30 - 04: 1 0 0.67 DRILL P PROD1 10810',50 bbls of new mud with MI clay guard on location. Added to active pits and mixed. Going down hole also. Enough clay guard added to bring entire system up to 14 #/bbl. 04:10 - 05:50 1.67 DRILL P PROD1 10848', unable to maintain motor work. Bit balling? Wiper trip to shoe. 05:50 - 06:00 0.17 DRILL P PROD1 Back on bottom. Appears somethings wrong with the downhole motor. Run into bottom with reduced pump and try to stall motor without success. Good weight transfer. This condition preceeded the wiper trip. 06:00 - 08:15 2.25 DRILL P PROD1 TOH to replace motor. 08: 15 - 09:20 1.08 DRILL P PROD1 Change out motor and bit. Check torque on service breaks. 09:20 - 10:50 1.50 DRILL P PROD1 RIH 10:50 - 11 :00 0.17 DRILL P PROD1 Log tie-in -6' correction. 11 :00 - 11 :50 0.83 DRILL P PROD1 RIH to bottom 11:50-11:55 0.08 DRILL N PROD1 Tagged bottom and lost all comms with BHI tools. 11 :55 - 14:00 2.08 DRILL N SFAL PROD1 TOH to window. Inspect electrical connections on surface. No trouble found with connections. POOH to check coil track tools. 14:00 - 15:45 1.75 DRILL N SFAL PROD1 Check out tools at surface. Determine intermitent short in e-line connection box inside reel. Replace junction box and mu new connections. 15:45 - 18:00 2.25 DRILL N SFAL PROD1 RIH with drilling assembly. 18:00 - 18:15 0.25 DRILL P PROD1 Ream 14N shale. 18:15 - 22:30 4.25 DRILL P PROD1 Directionally drill 1.55 1 1.53 bpm @ 3344 psi, 3150 psi =FS, DH annulus pressure 4,859 psi, DH tubing pressure 5330 psi. ECD 10.69 at 8977 TVD. WOB 1.1 k Drill to 10,987'. 22:30 - 00:00 1.50 DRILL P PROD1 Wiper trip to window. Tight at 10,700'. 4/30/2003 00:00 - 00: 15 0.25 DRILL P PROD1 Wiper to window. 00:15 - 01:15 1.00 DRILL P PROD1 RIH to TD. Having trouble sliding numerous stalls WOB 104# jumps to 3200# and stalls. Will slug one bbllubtex into 47bbl. 01: 15 - 01 :30 0.25 DRILL P PROD1 Short trip while adding lubtex to perserve coil life. 01 :30 - 03:15 1.75 DRILL P PROD1 Attempting to drill. Constant stalling due to poor sliding. Tried 10 bbl new mud. Little improvement maybe. Drilled to 11,002'. Having trouble sliding but creeping in seemed to make some progress. New mud system being built. 03: 15 - 03:40 0.42 DRILL P PROD1 400' wiper trip. Tight spot at 10650-10700 improved 03:40 - 08:00 4.33 DRILL P PROD1 Attempt to drill. Still stacking but was able to creep up and made a little progress. Able to stall bit, weight transfer ok. Gnaw down to 11011'. 30-40% chert shards in samples. Beginning to suspect bit may be damaged or worn. 08:00 - 10:30 2.50 DRILL P PROD1 POOH to check bit. Order new mud system to location. 10:30 - 13:30 3.00 DRILL N DFAL PROD1 Get off well. Found coil track BHA had disconnected, apparently happened when command to open circulation port was sent. Verify fishing neck. Discuss fishing options and order BHA components. MU same. Printed: 5/5/2003 11 :28:20 AM ( (, Page 6 of 8 BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-45 F-45 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Date From - To Hours Task Code NPT Phase 4/30/2003 1.75 FISH DFAL PROD1 DFAL PROD1 DFAL PROD1 DFAL PROD1 PROD1 PROD1 DFAL PROD1 DFAL PROD1 DFAL PROD1 DFAL PROD1 DFAL PROD1 PROD1 PROD1 PROD1 PROD1 N 13:30 -15:15 15:15 - 17:15 2.00 FISH N 17:15 - 20:30 3.25 FISH N 20:30 - 21 :00 0.50 FISH N 21 :00 - 21 :30 0.50 DRILL P 21 :30 - 22:30 1.00 DRILL P 22:30 - 23:00 0.50 DRILL N 23:00 - 23:30 0.50 DRILL N 23:30 - 00:00 0.50 DRILL N 5/1/2003 00:00 - 00:15 0.25 DRILL N 00:15 - 01 :00 0.75 DRILL N 01 :00 - 02:00 1.00 DRILL P 02:00 - 02: 15 0.25 DRILL P 02:15 - 02:50 0.58 DRILL P 02:50 - 04:30 1,67 DRILL P 04:30 - 05:30 1.00 DRILL P PROD1 05:30 - 05:45 0.25 DRILL P PROD1 05:45 - 07:00 1.25 DRILL P PROD1 07:00 - 09:00 2.00 DRILL P PROD1 09:00 - 10:00 1.00 DRILL P PROD1 10:00 - 10:30 0.50 DRILL P PROD1 10:30 - 10:45 0.25 CASE P COMP 10:45 - 12:30 1.75 CASE P COMP 12:30 - 14:30 2.00 CASE P COMP 14:30 - 14:45 0.25 CASE P COMP 14:45 - 15:15 0.50 CASE P COMP 15:15 - 15:45 0.50 CASE P COMP 15:45 - 17:00 1.25 CASE P COMP 17:00 - 17:15 0.25 CASE P COMP 17:15 - 21 :30 4.25 CASE P COMP 21 :30 - 21 :45 0.25 CASE P COMP 21 :45 - 22:30 0.75 CASE P COMP 22:30 - 00:00 1.50 CASE P COMP 5/2/2003 00:00 - 00:30 0.50 CASE P COMP Start: 4/23/2003 Rig Release: 5/5/2003 Rig Number: N2 Spud Date: 4/25/2003 End: 5/5/2003 Description of Operations RIH with GS spear assembly. 27k# up wt at 9100'. 1600 psi @ .46 bpm circ rate. Continue to RIH. Ran all the way to TD (10983' uncorrected). Sat down with 1.5-2.0K# weight. Shut down pump. PU. Set back down again. No depth change. POOH filling across the top. Fish recovered. LD fishing tools and BHA. Bit had extensive damage to nose and gauge cutters but was in gauge. PU drilling BHA. RIH to 4600. Lost communication with orienter. Trouble shoot orienter. POH to surface. Change out orienter. Continue to change out orienter. RIH to 4500'. Continue to RIH to 9040' Tie in. Correct depth -12'. Continue to RIH. Tag bottom 11010'. Directionally drill 1.54/1.54 bpm at 3300 psLFS = 3180 psi, DH annular pressure 4811 psi, DH tubing pressure 5071 psi, ECD 10.36 @ 8978 TVD, WOB 1700. ROP 139. Drill to11,150 TD. Wiper to window. Hole smooth. Log final gr tie in. RIH to TD. Corrected total depth is 11151'. POOH for 2nd wiper trip. Will leave new mud in hole instead of hi-vis pill. Displace coil to water. Chase with 10 bbls meoh. Displace top 1000' of well to water. Get off well. LD drilling BHA. Hold PJSM before blowing down coil with N2. Discuss procedure & fluid handling concerns. Blow down 2" e-line reel to tiger tank. Unstab coil from injector. Spool back to reel. Secure coil. Dress coil end and install slip on 1502. Hold PJSM to discuss running liner. RU floor to run 2-3/8" liner. Begin running liner. YT elevators hanging up on cementralizers. Set plate on elevators appears to be worn. Order a replacement set of YT's from Baker Fishing. Continue running liner by removing cementralizers and using lift nubbins. Re-install cementralizers on pin end and MU with power tongs. Continue to MU 65 jts 2-3/8" 4.3# L-80 STL liner with jewelry. PU YT elevators from Baker Fishing tools. These work ok on pipe. Continue to MU liner. PU liner running tools. PJSM. Stab coil into injector. Pull coil and stab coil into injector. Install slip type coil connector. RU hoses to circulate out Methanol from coil. Circulate methanol from coil with 20 bbl water and mud. Circulate out to tiger tank. Printed: 5/5/2003 11 :28:20 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ( ( BP EXPLORATION Operations Summary Report Page 7 of 8 F-45 F-45 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 4/23/2003 Rig Release: 5/5/2003 Rig Number: N2 Spud Date: 4/25/2003 End: 5/5/2003 Date From - To Hours Task Code NPT Phase Description of Operations 5/2/2003 00:30 - 01 :30 1.00 CASE P COMP Cut off coilconnector. Install weld on coil connector. Pull test 30K. Pressure test to 3500 psi. 01 :30 - 02:15 0.75 CASE P COMP Pump dart. Calculated 41.4 bbl. Dart volume 39.9 bbl. 02: 15 - 02:30 0.25 CASE P COMP Mu liner running tool to coil. Stab onto well. 02:30 - 03:40 1.17 CASE P COMP RIH with liner to 9200'. UP WT 26.4K DW WT 14.2K. 03:40 - 04:30 0.83 CASE P COMP Continue to RIH. Seen window at 9250. No Problem. RIH to 11,165 Up wt 34K 04:30 - 05:30 1,00 CASE P COMP Drop ball and launch. Release from liner with 3800 psi. Circulate out small amount gas. 05:30 - 06:45 1.25 CEMT P COMP Change well over to KCL. 06:45 - 07:00 0.25 CEMT P COMP Hold PJSM to discuss cement job. Review pump schedule, safe areas, clean up. 07:00 - 08:45 1.75 CEMT P COMP Batch mix cement. Continue to circ KCL water. 3200 psi @ 1.92 bpm. 1: 1 rtns. Cement to weight (15.8) at 0730. Pump 2 bbls fresh water. Pressure test lines to 6000 psi. Pump 12 bbls Class G latex into reel. Clean up lines back to cementers. Load dart. Launch with 500 psi. Pump .25 bbls. Verify dart launch. Displace with 40.1 bbls bio. 3500 psi @ 1.9 bpm average. Shear plug at 40.1 at 4000 psi @ 1.5 bpm. Land at 47.6 bbls. (Calculated is 47.8 bbls) Shut down pump & bleed coil to 500 psi. PU off liner. POOH. Replace voidage with 2# bio. CIP @ 0845 hrs. 08:45 - 10:30 1.75 CEMT P COMP POOH. Lay in biozan to replace voidage. 10:30 - 11 :30 1.00 CEMT P COMP At surface. Get off well. LD liner running tools. 11 :30 - 12:45 1.25 CLEAN P COMP MU 1-11/16" motor & 1.8" parabolic mill on 32 stds 1" CSH. Check each CSH connection. Get on coil. Stab on well. 12:45 - 16:00 3.25 CLEAN P COMP RIH with clean out assembly. Monitor UCA test at SLB lab. No compressive strength yet. 16:00 - 16:30 0.50 CLEAN P COMP Mix 45 bbls 2# biozan. 16:30 - 18:00 1.50 CLEAN P COMP Wash through TOL at 9149' to PBTD. 1950 psi @ 1.1 bpm. Indications of TOe at 9450'. GO out side with contaminated bio/cement. Tag PBTD at 11,189 un corrected. 18:00 - 20:15 2.25 CLEAN P COMP POH to CS Hydril. 20:15 - 22:30 2.25 CLEAN P COMP Stand back 1" CS Hydril tubing. LD cleanout assembly. 22:30 - 00:00 1.50 BOPSUR P COMP Test BOP's. Witnessing test waived by John Crisp AOGCC. 5/3/2003 00:00 - 03:30 3.50 BOPSUR P COMP Continue testing BOP's. 03:30 - 04:30 1.00 EVAL P COMP Clear floor. Install Beam Clamps. 04:30 - 06:00 1.50 EVAL P COMP MU memory logging BHA. (gr/ccl/cnl) 06:00 - 07:45 1,75 EVAL P COMP MU GR/CCL/CNL tools on 32 stands 1" CSH Hydril. Get on well. 07:45 - 09:45 2.00 EVAL P COMP RIH to 9000'. 09:45 - 11 :00 1.25 EVAL P COMP Log down at 30 fpm with gr/ccl/cnl. Pump 10 bbls new hi vis flo pro pill down coil. Tag TD at 11149' (uncorrected) 11 :00 - 11 :45 0.75 EVAL P COMP Log up pass at 60 fpm. Lay in perf pill. 11:45 - 13:30 1.75 EVAL P COMP POOH to CSH. 13:30 - 14:30 1.00 EVAL P COMP Get off well. Stand back CSH. Remove CNL source. LD logging tools with floor cleared. 14:30 -15:30 1.00 EVAL P COMP Pressure test liner lap for 30 minutes. Held 2000 psi for 8-10 minutes then began to bleed down. Bled to zero in 20 minutes. Pressure up again to 2000 psi. Began to bleed off immediately. 15:30 - 16:00 0.50 PERF P COMP Evaluate CNL log in town. Continue to load pipe shed with perf guns, Prep to run guns. Printed: 5/5/2003 11 :28:20 AM ( ( BP EXPLORATION Operations Summary Report Page 8 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: F-45 F-45 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Start: 4/23/2003 Rig Release: 5/5/2003 Rig Number: N2 Spud Date: 4/25/2003 End: 5/5/2003 Date From - To Hours Task Code NPT Phase Description of Operations 5/3/2003 16:00 -16:15 0.25 PERF P COMP Hold PJSM to discuss handling and running guns, floor assignments, no pumping etc. 16:15 - 19:00 2.75 PERF P COMP MU perf guns + 16 stands of 1" CS Hydril. 19:00 - 21 :30 2.50 PERF P COMP RIH tag at 11,141.4 uncorrected. 21 :30 - 22:00 0.50 PERF P COMP Circulate 9 bbl of pill, drop ball and chase with 4 bbl of pill followed with KCL. PU to position guns at 11,103' while circulating. 1.7 bpm 2975 psi. slow to.8 bpm 780 psi. Ball on seat with 31.2 bbl. Start moving pipe as pressure is increased to fire guns. At 3700 psi gun fired with bottom shot at 11,100.6'. Perforation intervals 9,970-10,400 : 10,750 - 10,830: and 10,890 - 11,100 shot with 1-11/16" Powerjet guns 4SPF. 22:00 - 00:00 2.00 PERF P COMP POH 30 fpm to liner top. 100 fpm from liner top to surface, At surface @ 23:59 5/4/2003 00:00 - 01 :00 1.00 PERF P COMP Stand back 16 stands of 1" CS Hydril. 01 :00 - 01: 15 0.25 PERF P COMP PJSM to LD perf guns 01:15 - 04:00 2.75 PERF P COMP LD perforating guns. All guns fired. 04:00 - 04:30 0.50 PERF P COMP Clear floor. 04:30 - 06:00 1.50 RUNCOI\.IP COMP PU liner top packer and running tools + 1jt PH6 tubing. 06:00 - 08:30 2.50 RUNCOI\.IP COMP RIH with Eclipse PB packer. Note some "gas" rtns from well. Flow check & divert through gas buster. Slight flow. Suspect perf gas in coil annulus. Continue to RIH. Pump at 0.4 bpm @ 125 psi. 08:30 - 09:00 0.50 RUNCOI\.IP COMP Up weight at 9100' :23.5K#. Drop 0.5" ball. Circulate over goose neck. 830 psi@ 1.23 bpm. 09:00 - 09:30 0.50 RUNCOI\.IP COMP Tag liner top at 9157'. Continue to 9160' (looks like seals going in tie back). Set down 5k#. Continue circulating at .4 bpm. No returns. PU to neutral weight (15K#). Wait on ball to continue falling. 09:30 - 09:45 0.25 RUNCOI\.IP COMP Ball on seat. Pressure up to 1200 psi to start set. Pressure up to 2500 psi. PU on coil to up wt 25K to finish packer set. Coil pressure dropped from 2100 psi to 0 psi at up wt of 23K#. Set back down & try to pressure up. Pressure up to 3200 psi pumping at .6 bpm with full returns. Not sure what's going on. Uable to pressure test backside. Hope we set pkr and sheared off tool early. 09:45 - 12:00 2.25 RUNCOI\.IP COMP POOH to check running tool. Hole fill normal. 12:00 - 13:00 1.00 RUNCOrvP COMP At surface. Get off well. LD & check BHA. Packer setting tool appears to have stroked correctly. Packer should be set properly. 13:00 - 15:00 2.00 WHSUR P COMP RIH with 1" CSH from derrick (3199'). 15:00 - 16:30 1.50 WHSUR P COMP Circulate fresh water around to rinse KCL off of CSH (1" CSH is going into storage). 16:30 - 21:00 4.50 WHSUR P COMP POOH. LD CSH in singles. 21 :00 - 22:45 1.75 WHSUR P COMP PU nozzle and RIH freeze protect to 2000. POH while spotting 60/40 methanol. 22:45 - 00:00 1.25 RIGD P POST Clean pits and RD. 5/5/2003 00:00 - 07:00 7.00 RIGD P POST Continue to RD and prep for move. Delayed getting vac truck to finish cleaning pits due to Phase 2 weather. Release rig at 0700 hrs on 5/5/03. Printed: 5/5/2003 11 :28:20 AM ...~ Vbp (' ( BP Baker Hughes INTEQ Survey Report Bíi. BAKD HUGHES lNTEQ Company: BP Amoco Field: Prudhoe Bay Site: PB F Pad Well: F-45 Wellpath: F-45A Field: Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Date: 6/2/2003 Time: 15:33:46 Page: Co-ordinate(NE) Reference: Well: F-45. True North Vertical (TVD) Reference: 48: 452/27/1991 00:0065.7 Section (VS) Reference: Well (0.00N,O.00E,320.00Azi) Survey Calculation Method: Minimum Curvature Db: Oracle Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Site: PB F Pad TR-11-13 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5972527.29 ft 650960.70 ft Latitude: Longitude: North Reference: Grid Convergence: 70 19 55.283 N 148 46 31.468 W True 1.15 deg Well: F-45 Slot Name: 45 F-45 Well Position: +N/-S 1152.75 ft Northing: 5973714.20 ft Latitude: 70 20 6.619 N +E/-W 1713.45 ft Easting : 652650.48 ft Longitude: 148 45 41 .431 W Position Uncertainty: 0.00 ft +N/-S ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 F-45 9250.03 ft Mean Sea Level 25.85 deg 80.84 deg Direction deg 320.00 Wellpath: F-45A 500292214201 Current Datum: 48: 45 2/27/1991 00:00 Magnetic Data: 4/24/2003 Field Strength: 57541 nT Vertical Section: Depth From (TVD) ft 0.00 Height 65.71 ft Survey Program for Definitive Well path Date: 6/2/2003 Validated: Yes Version: 2 Actual From To Survey Toolcode Tool Name ft ft 32,00 9250.03 1 : Schlumberger GCT multishot GCT-MS Schlumberger GCT multishot 9250.03 11151.00 MWD MWD MWD - Standard Annotation MD TVD ft ft 9250.03 8971.89 KOP 11151.00 9044.37 TD Survey: MWD Start Date: 5/1/2003 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Survey MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS ft deg deg ft ft ft ft ft ft ft deg/100ft 9250.03 33.89 151 .45 8971.89 8906.18 -962.35 796.90 5972768.34 653466.75 -1249.44 0.00 9265.52 45.85 151.45 8983.76 8918.05 -971.06 801.64 5972759.73 653471.66 -1259.16 77.23 9295.72 52.92 163.57 9003.45 8937.74 -992.20 810.25 5972738.77 653480.70 -1280.89 38.35 9326.90 61.31 172.87 9020.39 8954.68 -1017.79 815.49 5972713.30 653486.45 -1303.86 36.72 9351.62 68.05 179.83 9030.97 8965.26 -1040.06 816.87 5972691.06 653488.29 -1321.80 37.28 9381.77 78.11 181.30 9039.73 8974.02 -1068.86 816.58 5972662.26 653488.58 -1343.68 33.69 9410.66 85.30 190.00 9043.90 8978.19 -1097.26 813.75 5972633.81 653486.33 -1363.62 38.81 9451.10 89.91 201.28 9045.60 8979.89 -1136.10 802.87 5972594.77 653476.24 -1386.37 30.10 9487.48 90.43 212.71 9045.49 8979.78 -1168.46 786.38 5972562.08 653460.42 -1400.57 31.45 9526.44 87.33 217.23 9046.25 8980.54 -1200.37 764.07 5972529.72 653438.76 -1410.67 14.07 9566.33 90.58 225.42 9046.98 8981.27 -1230.29 737.75 5972499.28 653413.07 -1416.67 22.08 9615.15 89.33 240.40 9047.02 8981.31 -1259.65 698.92 5972469.14 653374.84 -1414.20 30.79 / ( II.. ..,,~ BP BAKER \.Ibp NUCHES Baker Hughes INTEQ Survey Report ....--.,..-..........-.......... INTEQ Company: BP Amoco Date: 6/2/2003 Time: 15:33:46 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: F-45. True North Site: PB F Pad Vertical (TVD) Reference: 48: 45 2/27/1991 00:0065.7 Well: F-45 Section (VS) Reference: Well (0.00N,0.00E,320.00Azi) Wellpath: F-45A Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS ft deg deg ft ft ft ft ft ft ft deg/100ft 9645.05 88.65 250.24 9047.55 8981.84 -1272.11 671.79 5972456.12 653347.97 -1406.31 32.98 9674.46 88.34 256.76 9048.32 8982.61 -1280.46 643,62 5972447.20 653319.98 -1394.60 22.19 9700.18 88.28 259.23 9049.08 8983.37 -1285.81 618.47 5972441.35 653294.95 -1382.53 9.60 9731.70 89.75 266.65 9049.62 8983.91 -1289.68 587.22 5972436,84 653263.78 -1365.41 23.99 9765.23 88.87 256.54 9050.03 8984.32 -1294.57 554.10 5972431.27 653230.77 -1347.86 30.26 9800.25 89.63 257.89 9050.48 8984.77 -1302.32 519,95 5972422.83 653196.79 -1331.85 4.42 9830.13 93.10 268.70 9049.77 8984.06 -1305.80 490.33 5972418.75 653167.25 -1315.48 37.98 9863.73 92.76 275.55 9048.05 8982,34 -1304.56 456.82 5972419.31 653133.72 -1292.99 20.39 9889.98 88.99 280.15 9047,65 8981.94 -1300.98 430.83 5972422.36 653107.66 -1273.54 22.65 9920.88 90,12 287.02 9047.89 8982.18 -1293.72 400.81 5972429.00 653077.51 -1248.68 22.53 9951.32 90.80 296.59 9047.65 8981.94 -1282.43 372.58 5972439.72 653049.06 -1221.89 31.52 9984.51 91.99 305.28 9046.84 8981.13 -1265.39 344.15 5972456.17 653020.29 -1190.56 26.42 10010.55 87.27 309.18 9047.00 8981.29 -1249.64 323.43 5972471.49 652999.25 -1165.18 23.51 10040.53 87.85 311.79 9048.28 8982.57 -1230.20 300.65 5972490.47 652976.08 -1135.64 8.91 10071.49 91.29 315.90 9048.51 8982.80 -1208.76 278.33 5972511 .45 652953.33 -1104.87 17.31 10101.54 91.96 320.53 9047.66 8981.95 -1186.37 258.32 5972533.43 652932.87 -1074.85 15.56 10135.66 91.11 326.36 9046.75 8981.04 -1158.98 238.01 5972560.39 652912,01 -1040.82 17.26 10166.01 91.35 331.01 9046.09 8980.38 -1133.07 222.25 5972585.98 652895.72 -1010.84 15.34 10201.25 90.15 336.17 9045,63 8979.92 -1101,52 206.58 5972617.20 652879.42 -976.60 15.03 10232.72 89.08 340.63 9045.84 8980.13 -1072.27 195.00 5972646.21 652867.25 -946,75 14.57 10260.71 89.91 346.30 9046.09 8980.38 -1045.45 187.04 5972672.86 652858.74 -921.08 20.47 10290.89 88.83 348.87 9046.42 8980.71 -1015.98 180.55 5972702.19 652851.65 -894.34 9.24 10320.71 87.76 352.40 9047.31 8981.60 -986.57 175.70 5972731.48 652846.21 -868.69 12.36 10350.32 87.36 355.39 9048.57 8982.86 -957.16 172.55 5972760.82 652842.46 -844.14 10.18 10386.96 86.32 1.89 9050.59 8984.88 -920.61 171.68 5972797.35 652840.85 -815.58 17.94 10419.16 90.65 4.41 9051 .44 8985.73 -888.48 173.45 5972829.51 652841.97 -792.11 15.56 10456.76 90.43 9.04 9051.09 8985.38 -851.15 177.85 5972866.92 652845.61 -766.34 12.33 10487.01 91.57 12.13 9050.56 8984.85 -821.42 183.41 5972896.75 652850.56 -747.14 10.89 10520.54 92.18 17.43 9049.46 8983.75 -789.03 191.95 5972929.30 652858.44 -727.82 15.90 10550.36 90.03 18.65 9048.89 8983.18 -760.68 201.19 5972957.83 652867.09 -712.04 8.29 10581.24 91.81 16.79 9048.39 8982.68 -731.27 210.58 5972987.42 652875.89 -695.55 8.34 10610.79 88.10 13.26 9048.42 8982.71 -702.74 218,24 5973016.10 652882.96 -678.62 17.33 10641.28 90.58 15.92 9048,77 8983.06 -673.24 225.92 5973045.75 652890.04 -660.95 11.93 10669.93 94.95 13.32 9047.38 8981.67 -645.56 233.14 5973073.57 652896.70 -644.39 17.74 10710.13 93.77 9.16 9044.33 8978.62 -606.26 240.95 5973113.02 652903.70 -619.30 10.73 10743.75 93.62 5.75 9042.16 8976.45 -573.00 245.31 5973146.36 652907.38 -596.62 10.13 10778.15 91.94 3.03 9040.49 8974.78 -538.74 247.93 5973180.66 652909.31 -572.07 9.29 10809.53 88.43 359.12 9040.39 8974.68 -507.38 248.52 5973212.03 652909.26 -548.42 16.74 10847.78 83.83 356.59 9042.97 8977.26 -469.25 247.10 5973250.11 652907.06 -518.30 13.72 10880.55 85.65 349.68 9045.98 8980.27 -436.88 243.20 5973282.40 652902.50 -490.99 21.72 10911.32 89.08 347.72 9047.39 8981.68 -406.74 237.17 5973312.40 652895.87 -464.04 12.84 10940.60 92.25 346.70 9047.05 8981.34 -378.20 230.69 5973340.81 652888.81 -438.00 11.37 10969.04 91.04 348.71 9046.24 8980.53 -350.42 224.64 5973368.45 652882.19 -412.83 8.25 11003.37 89.60 343.11 9046.05 8980.34 -317.14 216.29 5973401.56 652873.16 -381.97 16.84 11040.75 88.59 339.06 9046.64 8980.93 -281.79 204.17 5973436.65 652860.33 -347.10 11.17 11071.85 91.66 337.22 9046.57 8980.86 -252.93 192.60 5973465.26 652848.17 -317.55 11.51 11100.53 92.06 333.00 9045.64 8979.93 -226.93 180.53 5973491.01 652835.58 -289.89 14.77 11125.96 91.23 330.59 9044.91 8979.20 -204.53 168,52 5973513.16 652823.12 -265.01 10.02 11151.00 91.23 330.59 9044.37 8978.66 -182.73 156.23 5973534.71 652810.38 -240.40 0.00 BP Amoco Parent Wellpath: Tie on MD: WELLPATH DETAILS F-45A 500292214201 F-45 9250.03 Rig: Ref. Datum: Nordic 2 48 : 45 2/27/1991 00:00 55.71ft V.Section Origin Origin Angle +N/-S +EI-W 320.00· 0.00 0.00 Starting From TVD 0.00 REFERENCE INFORMATION Co-ordinate (N/E) Reference: Well Centre: F-45, True North Vertical (TVD) Reference: System: Mean Sea Level Section (VS) Reference: Slot - 45 (O.ooN,O.OOE) Measured Depth Reference: 48: 45 2/27/1991 00:00 65.71 Calculation Method: Minimum Curvature ANNOTATIONS lVD MO Annotation +EJ.W ..... gt~ ~ 116.28 = ~~ Pd¡goo -23'-39 = mil 5r Ilf' 0.00 -12~421 0.00 -853.05 0.00 -348_81 0_00 _1176.32 0.00 ·705.61 0.00 7.51 0.00 11-43 8918_00 -1J2ô.38 898Q.00 -1258-7.4 8984.00 -2C06..uì 8906.18 9250.03 KOP 8978.66 11151,00 TO LEGENO F·45.F-45A,Plan #3 ----- F-45 (F-45) F-45A T ^M Azimuths to True North Magnetic North: 25.85· Magnetic Field Strength: 57541nT Dip Angle: 80.84· Date: 4/24/2003 Model: BGGM2002 ~~~;~~;¡: í~~:;~l~~~:j~~~~¡~T1Jq.(çm 63!<ûr HU~lÍ1~:S ir-JTEC.i" {~Oïì :::-ß ï ·fr:~)í) Wellpalh: (F-45/F-45A) Created By: Brij Pomis Dale: 6/2/2003 , Ii C~·;r:~w;t 1nfQrfn:~ti()n ê - c æ o o ~ - lUU----:;.-- .... " .... ....... .. · · . . · v .. · . · · .~ . · . · · ... .... ...-- . -IVV · · . "2 /J--'- ~ . · . --- · · .. --f FB1 · -,£.uu n__n .-.-- .--.- . , - ,- \\ """ · -- ... .. · .. · . . "'-. · -"vv .. · · . · · \ ~. · · "vu · '.. . . --- · · -- . -"vv n · . .. ..... .... ...... .. '\ -_. · · · . . · \ . ·vvv .. ..... ........... ... \ .... . \~ .. · · · V -- 'uu- -- .... ..... ----.- .......--....... .. ........ .-- ^ .' · -- · -- . · . · · -ovv ... ..... .. ........ ...... .... · · · ...... -::¡uu-- · n KOP '.' · · · . IVVV · . · ·__~f · .. · · .. 1100: .. . <-- .. ... .... ..---- ... .... · .... .. .' \~ · · · 120<>--= · · ~ ...... ..... · .......................... ....... ..--.. ... 'ç..... · I.JUU . . · . · ·....n__ '--- . '. · :~ ~~ ~ 1100 12001300 1400 '1~0 16'00 1700 ---- -550 -400 Vertical Section at 320.00° [50ft/in] 200 250 300 350 6t2t2~~ ("(C,) lì~ I/:\ lr r'C, \ '.. \! I i \ \ ¡ ¡ ,......; '~>, ¡! j ¡"".. \ ì L ( ,"",' ,.' IJ (il \ U! l '; ,~,~~' . L.I L1 r _' ,I ~ n-~ rr nì It:-~ I I U.- ~1¿) \ ( r~ "1 !Æ ~ ry? m 11\\ I ^ 1'\ !^\ ; ~ \ ¡ J I, \ , ,''--- \ LI Ü '~ J Q¿/ u\~ U-û 333 W. 7TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 FRANK H. MURKOWSKI, GOVERNOR AI/ASKA. OILAlWD GAS CONSERVATION COMMISSION Mary Endacott CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Prudhoe Bay Unit F-45A BP Exploration (Alaska), Inc. Permit No: 203-046 Surface Location: 3098' SNL, 2196' WEL, Sec. 02, T11N, R13E, UM Bottomhole Location: 3306' SNL, 2039' WEL, Sec.02, T11N, R13E, UM Dear Mr. Endacott: Enclosed is the approved application for pennit to redrill the above development well. This pennit to redrill does not exempt you from obtaining additional pennits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required pennits and approvals have been issued. In addition, the Commission reserves the right to withdraw the pennit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the tenns and conditions of this pennit may result in the revocation or suspension of the pennit. Please prOvide at least twenty-four (24) hours notice for a representative of the Commission to witness any required' test. Conta~t, the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~~/~ Randy Ruedrich Commissioner BY ORDER OF THE COMMISSION DATED thisÆ"day of March, 2003 cc: Department ofFish & Game, Habitat Section wlo encL Department of Environmental Conservation wlo encl. Exploration, Production and Refineries Section VJ6~ -slif 12~"~C),*S 1 a. Type of work 0 Drill III Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface x = 652650, Y = 5973714 3098' SNL, 2196' WEL, SEC. 02, T11 N, R13E, UM At top of productive interval x = 653371, Y = 5972952 3876' SNL, 1492' WEL, SEC. 02, T11 N, R13E, UM At total depth x = 652812, Y = 5973511 3306' SNL, 2039' WEL, SEC. 02, T11 N, R13E, UM - 'l STATE OF ALASKA I ALASKA (,-.f- AND GAS CONSERVATION COMJ._JION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test III Development Oil o Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (OF or KB) 10. Field and Pool KBE = 65.71' Prudhoe Bay Field / Prudhoe 6. Property Designation Bay Pool ADL 028280 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number F-45A 9. Approximate spud date 03/27/03 / Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 11150' MD / 9050' TVD o 17. Anticipated pressure {s~ 20 AAC 25.035 (e) (2)} 90 Maximum surface 2216 psig, At total depth (TVD) 8800' / 3272 psig Setting Depth Top Bottom Quantity of Cement Lenath MD TVD MD TVD (include staae data) 1915' 9190' 8862' 11150' 9050' 51 cu ft Class 'G' 11. Type Bond (See 20 AAC 25.025) Number 2S 100302630-277 12. Distance to nearest property line 13. Distance to nearest well / ADL 028281,3241' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 9250' MD Maximum Hole Angle 18. caSingJ;~gram Specifications Hole Casina Weiaht Grade Couplina 3" 2-3/8" 4.6# L-80 ST-L 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 9510 feet Plugs (measured) true vertical 9182 feet Effective depth: measured 9464 feet Junk (measured) true vertical 9145 feet Casing Length Size Cemented Structural Conductor Surface Intermediate Production Liner 110' 20" 2664' 13-3/8" 3723 cu ft Permafrost 8710' 9-5/8" 1746 cu ft Class 'G' 1084' 7" 300 cu ft Permafrost MD TVD 110' 110' 2664' 2664' 8710' 8502' 8426' - 9510' 8248' - 9182' 20. Attachments II Filing Fee 0 Property Plat II BOP Sketch II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis , ED f1AR122OOJ 0II"~'Ga1Q1.~ , o Diverter Sketch' 'on o Seabed Report 112 . 5.050 Requirements ~erforationdepth:measured 9150' - 9154', 9280' - 9295', 9345' - 9368' I':. ". ..' -'true vertical 8888' - 8891', 8997' - 9009', 9050' - 9069' Contact Engineer Name/Number: Mary Endacott, 564-4388 Prepared By Name/Number: Terrie Hubble, 564-4628 ~·~~i~n'~I~::~-~~~~~~~~:¡,:'.,~,,_~,·"",;,i,',·",',:,.,·",:").;,~I.,',~,",,,i,:,,~I;,',,',~,;,',,;,': :' ~ ,,". ',: '.- ,. "'" ':, ',', i' ~ '., '1.' , ':"")' : i' ," ....:',,;'.-:, '" 'I .'i"{": 'I'., :', : I"~:' "I' i::',;'::¡iZf}<::r,'. "," ',':,,1,11,:", ", i " ,,",'''-'''',::1' ',I' ir """,! ~"',I: I,:,,' ',' ,','?:'~:~\':!":'~" ~,~"~':~ ,~,",~,~ " "~, ,I\iI',I'OI''IIr ",'N!'!II.I, ,"", ;,,'1",' :,,:,1,' :'!,},,":,' ..'i 't,,!, ,,::',: :"::"",,,':,'1',(1;,,' ,/1' ,":;I., ':'\11':' ::.-,'::,-,: ,1"1, ',:, '":,,..i,,", ¡.... .. ,I",::, ",,"1':"'" ,i " : ',,: ,,':', '11",:"1,',,, :,,:/::1,:: ':-'"! :', ",:: ", ," """ '",'" Permit Number API Number Apl?roval Date See cover letter -2.0 ~ - 0 "Y~ 50- 029-22142-01 ~ / I ~ 10"3 for other reauirements Conditions of Approval: Samples Required 0 Yes EI No Mud Log Required 0 Yes ~ No Hydrogen Sulfide Measures ~ Yes 0 No Directional Survey Required J8I Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other:TëSt l~oPE fo ~ÇOD f}5.i. ~,Á--~ Approved By ~t-- ~ Form 10-401 Rev. 12-01-85 Commissioner 'î by order of the commission Date 3/ /y /D3 Submit In Triplicate 'g)l9/é~3 ') L ¡ ,( f BP F-45a CTD Sidetrack Summary of Operations: Phase 1: Prep work 1. Integrity testing 2. Service coil to lay 17 ppg cement from 9464' to approx. 9;96' to provide for a cement whipstock. A minimum of 10bbls of 17 ppg cement will be used. / Phase 2: Mill window, Drill and Complete sidetrack: Planned for March 27, 2003. Drilling coil will be used to mill the window at 9250' MD (8909'ss)from a cement ramp then drill and complete the directional hole as per attached plan. Maximum hole angle will be 90 degrees. Mud Program: · Phase 1: Seawater · Phase 2: Mill with seawater/biozan, drill with Flo-Pro (8.6 - 8.7 ppg) / Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: / The production li~e, Hi)be 2 3/8" ST-L from TD to approx. 9190'MD (8862'ss). The liner will be cemented with a minimum 0 9,(S to bring cement up to top of liner. ,/ Well Control: . · BOP diagram is attached. /' · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi. · The annular preventer will be tested to 400 psi and 2500 psi. Directional · See attached directional plan. Max. planned hole angle is 90 deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · MWD Gamma Ray will be run in..the open hole section. Memory CNL will be run inside the liner. Hazards / · The maximum recorded H2S on F Pad is 30 ppm on well F-43. . · Zones 2 conglomerates may cause slow ROP, possible bit damage. · Three small faults will be crossed, lost circulation is considered medium risk Reservoir Pressure Res. press. is estimated to be 3272 psi at 8800'ss (7.2 ppg emw). Max. surface pressure with gas (0.12 psi/ft) to surface is 2216 psi. / -TREE = . 3-1/8" 5M CIW WELLHEAD = FMC ACTUA TOR = OTIS KB. ELEV = 65.71' BF. ELEV = 37.95' KOP = 6300' Max Angle = 37 @ 9500' Datum MD = 9124' Datum lVD = 8800' SS 14-1/2" TBG, 12.6#, L-80, 0.0152 bpf. ID = 3.958" l-t I TOP OF 3-1/2" TBG 1-1 113-3/8" CSG, 68#, L-80, ID = 12.415" 1-1 f F -45A I I 1 SAFV, "NOTES: TIW PKRS MAY FAIL IF MORETHAN 210~ DIFFERENTIAL PRESSURE IS EXCEEDED. CHROME LNR *** IAXOACOMM. OPERATING PRESSURE OF THE 13-3/8" ANNULUS MUST NOT EXCEED 2500 PSI (1 0/27/02 WAIVER) *** 2059' 1-14-1/2" OTIS SSSV NIP, ID = 3.813" I 2123' 1-14-1/2" X 3-1/2" XO I GAS LIFT MANDRELS DEV 1YÆ VLV LATCH PORT o MERLA RA 1 MERLA RA 24 MERLA RA 26 MERLA RA 26 MERLA RA Proposed CTD Sidetrack 2123' 2123' 2664' Minimum ID = 2.750" @ 8365' 3-1/2" PARKER SWS NIPPLE ~ ~ . I' L I I :8: ~ I TOP OF 7" LNR 1-1 8426' 1-1 I 19-5/8" CSG. 47#, L-80, ID = 8.681" 1-1 8711' ~ I Top of Cement 1-1 9190' 13-1/2" TBG, 9.2#, L-80, 0.0087 bpf, ID = 2.992" 1-1 9196' ÆRFORA TION SUMMARY REF LOG: SWS CET ON 03/13/91 ANGLEATTOPÆRF: 32 @ 9150' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4-1/2" 5 9150 - 9154 isolated proposed 2-1/8" 4 9285 - 9290 isolated proposed 2-1/2" 4 9280 - 9295 isolated proposed 4-1/2" 5 9345 - 9368 isolated proposed I PBTD 1-1 9464' 17" LNR, 26#, 13-CR, 0.0383 bpf, ID = 6.276" 1-1 9510' DATE 03/19/91 03/05/01 03/10/01 09/09/01 10/27/02 REV BY SIS-MH SIS-MD RNlTP BMlTP COMMENTS ORIGINAL COMPLETION CONVERTED TO CANVAS FINAL CORRECTIONS WA rv ER SAFETY NOTE DATE II [] ~ ~ ----1 I ~ ST MD lVD 5 3103 3037 4 5552 5486 3 7221 7093 2 8243 8018 1 8335 8100 DATE ¡,!,I'~" "",:,",',:,:::,.' ,]':¡Iii:::~ ;)i'''II'i'''I"",,:I:i . J'¡:i:I:I:i¡::I:il;I!\l::'::'r. I ~,,,,,,,,,,.,,,,:,,,,:,,,'::,,'.·11 'i I':;~:) I· I :i! r ¡¡i::1 !;.;::: j::I;j;: I ¡¡:,i '1111'1' 8365' 1-13-1/2" PARKER SWS NIP, ID = 2.750" 8374' 1-19-5/8" TIW HBBP-R RET PKR, ID = 4.00" ~ 9072' 1-13-1/2" OTIS XA SLIDING SLEEVE, 10 = 2.750" 9139' 1-1 BLAST JOINT, ID = 2.992" I 9165' 1-17" TIW HBBP ÆRM PKR 1 9185' 1-13-1/2" PARKER SWS NIP, ID = 2.750" l-i Top of 2-3/8" Liner I 9192' 1-13-1/2" PARKER SWS NIP, ID = 2.750" 9196' 1-13-1/2 WLEG I 9195' 1-1 ELMD TT LOGGED 03/19/91 i::;:'i :;::::: )1::: :,::I;i:¡:': I I I:,:,:,' "i,:",I,:,, II ~:, ) 9250' 1-1 Cement Ramp Window ,'I}" ~:I::::~!'I': ,Ii',ii:: ::!::",,: It,ll:"", ,', ""i',!I":,,, I' ;! :;1:.::.:';;,::" "'\\' , i! ,I ~)":::i'::";!:"'" ,', ' '1'" "";"",~",,:,,~ '1Imli""')"::I:I:"", ~) ,II,! II :~f""::':;::":::~: and::;ed"II"I;~; 11150' ~ REV BY COMMENTS PRUDHOE BAY UNIT WELL: F-45 ÆRMrr No: 1910280 API No: 50-029-22142-00 SEe 2, T11N, R13E, 2180' FSL & 2196' FEL BP Exploration (Alas ka) \\\~D ~1,"Yó ~O'" - .' r .--. :=. .;; Q., u ~ ""a ( '-e u > u ~ -9600 I o . - . . ¡. ¡ - ,'. '. -. · . , , · . 8200-- - -; - .L..._. .-~.. ... ..·..~..~I, .--~. '-i--:,\ .. ',. . I .. . _ ~. · . , · . ·84Ð~·-~:-h--+ -c~r·_:~- l-·-- 8600 j I . ii' . - - , " . ¡I : ¡ . awo ! Ii - . ~ ¡ ¡ ~o~o ~ +. : -~.~-~ !. - 1 F-45A 14.2 I I -91ß9- --. 9400 i i 200 I ¡ - j ! . I ¡ I I I. I i I I I . I I I . I 400 600 800 Vertical Section at i ; ¡ , 1000 141.76° ---t-', ~. i I 1 ~-45A 0.2 , . ¡I. ; 'i' 1200 1400 ft] I I I I ' 1600 I i ! ! h'_ · '. ¡- · . -- · . __4 ...-; ._---_.¡-~ . . , . !." : ¡ . ì --hi .: .L__._ . ¡ ~--;'-----l -T- :~L ~ '---;---- I '-" 1. i. +' ' , € I 0 , ~ ! -- I . ~ A 112 I 5 I 00 I I I ¡ ¡ L )lì F-45 --t I I I . I I I ¡ . + --~+..-- I W est ( - )/East( +) [ft] .. "11,dl :í"!i ~2~0,. (:m' ~"l" ,~ ~ ; ; ¡ . =~: 1F~ .4.2 pro ·,Jo ' I :-.¡":--'09':'';' " " . . . . j¡ 8~0 .' -,-- . . · i .40t '!~ :1-.- ; . _! I ¡ . -600 . \:. I ¡ . . ~ \ . :~80o-- .-: , ~'\ -- --- - .. ,-i'~ . - '. '-1000 \ ,. , ., \. .......-- -1200 +1 I ~\ : _ 1 F-45A ---- -' + -..- .1400: . ,~F.45 t1 2 I : -. ~. -- I 000 ~- i 200 j f ---., , . ":' '." .. >. ......-..-- ....-...--.. . . , . -. -. ""-. . MD .' V.See . . T.Face - ---_...---...-----_.._------~-----_..._.._--------_..-----_..- . . . '~*!i~~';::!~~3'i..?; ·:i.':.i..:/!;¿'·.(·~Z. '~ ,-. {' (' \ F-45A plan 3 xy.txt A: UWI: F-45 Depth: FT Distance: FT ELEVATION: 65.71 B: Common: F-45 c: Measr. Depth TVD Depth x-Offset v-offset x Y D: 30.21 30.21 0.00 0.00 652650.48 5973714.20 D: 32.00 32.00 0.00 0.00 652650.48 5973714.20 D: 38.60 38.60 0.00 0.00 652650.48 5973714.20 D: 55.80 55.80 0.02 -0.03 652650.50 5973714.17 D: 72.95 72.95 0.04 -0.06 652650.52 5973714.14 D: 90.10 90.10 0.08 -0.10 652650.56 5973714.11 D: 107.20 107 . 20 0.11 -0.15 652650.60 5973714.05 D: 124.40 124.40 0.15 -0.23 652650.63 5973713.98 D: 141.65 141. 65 0.19 -0.30 652650.67 5973713.91 D: 158.80 158.80 0.24 -0.36 65'2650.72 5973713.85 D: 176.00 176.00 0.29 -0.42 652650.78 5973713.79 D: 193.25 193.25 0.33 -0.47 652650.82 5973713.74 D: 210.55 210.55 0.37 -0.51 652650.86 5973713.70 D: 227.75 227.75 0.40 -0.56 652650.89 5973713.66 D: 245.10 245.10 0.42 -0.60 652650.91 5973713.61 D: 262.35 262.35 0.44 -0.64 652650.93 5973713.57 D: 279.65 279.65 0.46 -0.70 652650.95 5973713.52 D: 296.90 296.90 0.48 -0.76 652650.97 5973713.45 D: 314.25 314.25 0.49 -0.83 652650.99 5973713.38 D: 331.55 331.55 0.51 -0.91 652651.01 5973713.30 D: 348.95 348.95 0.53 -1.00 652651.03 5973713.21 D: 366.25 366.25 0.56 -1.10 652651.06 5973713.11 D: 383.60 383.60 0.59 -1. 21 652651.09 5973713.01 D: 400.95 400.95 0.61 -1. 32 652651.12 5973712.90 D: 418.35 418.35 0.65 -1.43 652651.16 5973712.79 D: 435.55 435.55 0.69 -1. 54 652651.20 5973712.67 D: 452.80 452.80 0.74 -1. 65 652651.26 5973712.57 D: 470.10 470.10 0.80 -1. 76 652651.31 5973712.46 D: 487.45 487.44 0.86 -1. 86 652651.37 5973712.37 D: 504.85 504.84 0.92 -1. 95 652651.43 5973712.27 D: 522.30 522.29 0.97 -2.05 652651. 49 5973712.18 D: 539.65 539.64 1.03 -2.13 652651. 55 5973712.09 D: 557.15 557.14 1.08 -2.21 652651.61 5973712.01 D: 574.55 574.54 1.13 -2.29 652651.66 5973711.94 D: 592.00 591.99 1.17 -2.37 652651.70 5973711. 86 D: 609.40 609.39 1.21 -2.45 652651.73 5973711.77 D: 626.85 626.84 1.23 -2.56 652651.77 5973711.67 D: 644.20 644.19 1.26 -2.67 652651.80 5973711.56 D: 661.60 661. 59 1.29 -2.78 652651.83 5973711. 45 D: 678.75 678.74 1. 33 -2.90 652651.87 5973711. 33 D: 695.95 695.94 1. 37 -3.02 652651.91 5973711.22 D: 713.10 713.09 1.42 -3.13 652651.96 5973711.10 D: 730.30 730.29 1.48 -3.25 652652.02 5973710.99 D: 748.40 748.39 1. 54 -3.35 652652.09 5973710.88 D: 765.60 765.59 1.60 -3.44 652652.15 5973710.79 D: 782.80 782.79 1.66 -3.53 652652.21 5973710.71 D: 800.00 799.99 1. 71 -3.59 652652.27 5973710.65 D: 817 . 20 817.19 1. 75 -3.64 652652.30 5973710.60 D: 834.40 834.39 1. 78 -3.67 652652.33 5973710.57 D: 851.70 851. 69 1. 79 -3.71 652652.34 5973710.53 D: 868.90 868.89 1. 79 -3.75 652652.34 5973710.49 D: 886.10 886.09 1.80 -3.78 652652.35 5973710.46 D: 903.30 903.29 1.81 -3.82 652652.37 5973710.42 D: 920.50 920.49 1.85 -3.87 652652.40 5973710.37 D: 937.70 937.69 1.89 -3.91 652652.45 5973710.33 D: 954.90 954.89 1.95 -3.95 652652.51 5973710.30 D: 972.10 972.09 2.01 -3.97 652652.57 5973710.28 D: 989.30 989.29 2.09 -3.97 652652.65 5973710.27 D: 1006.50 1006.49 2.17 -3.96 652652.73 5973710.29 D: 1023.70 1023.69 2.25 -3.93 652652.81 5973710.32 D: 1040.90 1040.89 2.34 -3.88 652652.89 5973710.37 D: 1058.10 1058.09 2.42 -3.82 652652.97 5973710.43 D: 1075.30 1075.29 2.49 -3.75 652653.05 5973710.51 D: 1092.50 1092.49 2.57 -3.67 652653.12 5973710.59 D: 1109.70 1109.69 2.64 -3.58 652653.20 5973710.68 D: 1126.90 1126.88 2.72 -3.48 652653.27 5973710.78 D: 1144.00 1143.98 2.81 -3.37 652653.36 5973710.89 page 1 .í f \ F-45A plan 3 xy.txt D: 1161. 20 1161.18 2.90 -3.25 652653.45 5973711.01 D: 1178.40 1178.38 2.99 -3.12 652653.53 5973711.14 D: 1195.50 1195.48 3.07 -2.99 652653.61 5973711.27 D: 1212.70 1212.68 3.14 -2.85 652653.68 5973711.41 D: 1229.90 1229.88 3.20 -2.72 652653.73 5973711.55 D: 1247.10 1247.08 3.24 -2.58 652653.77 5973711.69 D: 1264.30 1264.28 3.26 -2.43 652653.79 5973711.84 D: 1281. 50 1281. 48 3.26 -2.28 652653.79 5973711.99 D: 1298.70 1298.68 3.25 -2.13 652653.77 5973712.14 D: 1315.90 1315.88 3.23 -2.00 652653.75 5973712.27 D: 1333.00 1332.98 3.19 -1. 87 652653.71 5973712.40 D: 1350.30 1350.28 3.16 -1. 75 652653.67 5973712.51 D: 1367.50 1367.48 3.11 -1.64 652·653.63 5973712.63 D: 1384.70 1384.68 3.08 -1. 53 652653.59 5973712.74 D: 1401.90 1401.88 3.05 -1.42 652653.56 5973712.85 D: 1419.10 1419.08 3.05 -1. 32 652653.55 5973712.95 D: 1436.30 1436.28 3.05 -1. 22 652653.55 5973713.05 D: 1453.50 1453.47 3.05 -1.13 652653.55 5973713.14 D: 1470.50 1470.47 3.06 -1.04 652653.56 5973713.23 D: 1487.50 1487.47 3.07 -0.96 652653.57 5973713.31 D: 1504.40 1504.37 3.08 -0.88 652653.58 5973713.39 D: 1521. 40 1521.37 3.09 -0.80 652653.58 5973713.47 D: 1538.30 1538.27 3.09 -0.73 652653.58 5973713.54 D: 1555.30 1555.27 3.09 -0.67 652653.58 5973713.60 D: 1572.20 1572.17 3.09 -0.62 652653.58 5973713.65 D: 1589.20 1589.17 3.09 -0.58 652653.58 5973713.69 D: 1606.10 1606.07 3.11 -0.54 652653.60 5973713.72 D: 1623.10 1623.07 3.13 -0.51 652653.62 5973713.75 D: 1640.00 1639.97 3.18 -0.48 652653.66 5973713.79 D: 1656.90 1656.87 3.24 -0.44 652653.72 5973713.83 D: 1673.90 1673.87 3.31 -0.39 652653.79 5973713.88 D: 1690.90 1690.87 3.39 -0.34 652653.87 5973713.93 D: 1707.80 1707.77 3.47 -0.29 652653.95 5973713.98 D: 1724.80 1724.77 3.56 -0.22 652654.04 5973714.05 D: 1741. 80 1741. 77 3.64 -0.15 652654.12 5973714.12 D: 1758.70 1758.67 3.73 -0.08 652654.21 5973714.20 D: 1775.70 1775.67 3.82 0.00 652654.30 5973714.28 D: 1792.70 1792.67 3.91 0.09 652654.39 5973714.37 D: 1809.60 1809.57 4.01 0.18 652654.49 5973714.46 D: 1826.60 1826.57 4.12 0.27 652654.60 5973714.56 D: 1843.50 1843.47 4.25 0.39 652654.72 5973714.68 D: 1860. 50 1860.47 4.39 0.53 652654.86 5973714.82 D: 1877.50 1877.47 4.55 0.70 652655.02 5973714.99 D: 1894.40 1894.36 4.75 0.89 652655.21 5973715.19 D: 1911.30 1911.26 4.99 1.11 652655.45 5973715.42 D: 1928.20 1928.16 5.27 1. 36 652655.72 5973715.67 D: 1945.20 1945.15 5.58 1.62 652656.03 5973715.93 D: 1962.10 1962.05 5.91 1.88 652656.35 5973716.20 D: 1979.00 1978.94 6.24 2.12 652656.67 5973716.45 D: 1995.90 1995.84 6.56 2.36 652656.99 5973716.70 D: 2012.80 2012.73 6.87 2.57 652657.30 5973716.92 D: 2029.70 2029.63 7.18 2.77 652657.60 5973717.12 D: 2046.60 2046.52 7.49 2.96 652657.91 5973717.31 D: 2063.50 2063.42 7.80 3.15 652658.21 5973717.51 D: 2080.40 2080.32 8.10 3.34 652658.51 5973717.71 D: 2097.30 2097.21 8.39 3.53 652658.80 5973717.91 D: 2116.00 2115.91 8.72 3.74 652659.12 5973718.12 D: 2135.60 2135.50 9.07 3.97 652659.46 5973718.35 D: 2155.20 2155.10 9.41 4.18 652659.80 5973718.57 D: 2174.90 2174.80 9.75 4.38 652660.14 5973718.78 D: 2194.50 2194.39 10.11 4.58 652660.49 5973718.99 D: 2214.20 2214.09 10.47 4.77 652660.85 5973719.19 D: 2233.90 2233.78 10.81 4.95 652661.19 5973719.38 D: 2253.30 2253.18 11.12 5.10 652661. 49 5973719.53 D: 2272.70 2272.58 11.40 5.23 652661.77 5973719.66 D: 2292.10 2291. 98 11.66 5.33 652662.03 5973719.77 D: 2311. 50 2311. 38 11. 91 5.42 652662.27 5973719.86 D: 2330.80 2330.67 12.11 5.49 652662.47 5973719.94 D: 2350.20 2350.07 12.29 5.54 652662.65 5973720.00 D: 2369.50 2369.37 12.48 5.59 652662.84 5973720.05 page 2 ~ F-45A plan 3 xy.txt D: 2388.80 2388.67 12.67 5.65 652663.03 5973720.11 D: 2408.10 2407.97 12.86 5.71 652663.22 5973720.17 D: 2427.30 2427.17 13.03 5.78 652663.39 5973720.24 D: 2446.60 2446.47 13.18 5.84 652663.53 5973720.31 D: 2465.80 2465.67 13.31 5.88 652663.66 5973720.35 D: 2485.20 2485.07 13.44 5.91 652663.79 5973720.39 D: 2504.60 2504.47 13.57 5.93 652663.92 5973720.41 D: 2523.90 2523.77 13.69 5.96 652664.05 5973720.44 D: 2543.30 2543.17 13.82 5.98 652664.17 5973720.46 D: 2562.70 2562.57 13.95 6.00 652664.30 5973720.48 D: 2582.00 2581.87 14.07 6.01 652664.42 5973720.50 D: 2601. 30 2601.16 14.19 6.02 652664.54 5973720.51 D: 2620.70 2620.56 14.33 6.02 65"2664.68 5973720.51 D: 2640.00 2639.86 14.47 6.02 652664.83 5973720.52 D: 2659.30 2659.16 14.62 6.02 652664.97 5973720.52 D: 2678.70 2678.56 14.76 6.03 652665.11 5973720.53 D: 2698.00 2697.86 14.90 6.04 652665.25 5973720.54 D: 2717.30 2717.16 15.03 6.05 652665.38 5973720.56 D: 2736.60 2736.46 15.15 6.06 652665.50 5973720.57 D: 2755.80 2755.66 15.26 6.08 652665.61 5973720.59 D: 2775.10 2774.96 15.36 6.08 652665.71 5973720.60 D: 2794.30 2794.16 15.45 6.08 652665.80 5973720.60 D: 2813.50 2813.36 15.55 6.09 652665.90 5973720.60 0: 2832.70 2832.56 15.66 6.09 652666.01 5973720.61 D: 2852.10 2851.96 15.79 6.08 652666.14 5973720.61 0: 2871.10 2870.96 15 . 94 6.07 652666.30 5973720.60 D: 2888.90 2888.76 16.10 6.06 652666.45 5973720.59 0: 2906.70 2906.56 16.25 6.04 652666.61 5973720.57 0: 2924.40 2924.26 16.41 6.02 652666.76 5973720.56 0: 2942.20 2942.06 16.58 6.00 652666.93 5973720.54 D: 2960.00 2959.86 16.75 5.98 652667.10 5973720.52 0: 2977.70 2977.55 16.93 5.96 652667.28 5973720.50 0: 2995.50 2995.35 17.10 5.94 652667.45 5973720.49 0: 3013.20 3013.05 17.27 5.92 652667.62 5973720.48 0: 3030.70 3030.55 17.44 5.91 652667.79 5973720.46 0: 3048.20 3048.05 17.61 5.89 652667.97 5973720.45 0: 3065.60 3065.45 17.77 5.87 652668.12 5973720.43 0: 3083.10 3082.95 17.92 5.84 652668.27 5973720.41 0: 3100.50 3100.35 18.06 5.82 652668.41 5973720.39 D: 3117.90 3117.75 18.18 5.80 652668.54 5973720.37 D: 3135.30 3135.15 18.30 5.76 652668.66 5973720.34 0: 3152.80 3152.65 18.41 5.72 652668.77 5973720.30 0: 3170.20 3170.05 18.53 5.67 652668.89 5973720.25 0: 3187.70 3187.55 18.64 5.61 652669.00 5973720.19 0: 3205.30 3205.15 18.75 5.53 652669.11 5973720.11 0: 3222.80 3222.65 18.85 5.43 652669.22 5973720.02 0: 3240.30 3240.15 18.96 5.33 652669.32 5973719.92 0: 3257.80 3257.64 19.06 5.23 652669.42 5973719.81 0: 3275.20 3275.04 19.15 5.12 652669.52 5973719.71 0: 3292.70 3292.54 19.24 5.01 652669.62 5973719.60 0: 3310.20 3310.04 19.32 4.90 652669.70 5973719.50 0: 3327.60 3327.44 19.39 4.79 652669.77 5973719.39 D: 3345.10 3344.94 19.45 4.68 652669.83 5973719.28 D: 3362.60 3362.44 19.50 4.57 652669.88 5973719.17 0: 3380.10 3379.94 19. 54 4.47 652669.93 5973719.07 D: 3397.60 3397.44 19.57 4.38 652669.96 5973718.98 0: 3415.00 3414.84 19.60 4.29 652669.98 5973718.89 0: 3432.50 3432.34 19.62 4.20 652670.01 5973718.80 D: 3449.90 3449.74 19.64 4.10 652670.03 5973718.70 0: 3467.30 3467.14 19.66 4.00 652670.05 5973718.60 0: 3484.80 3484.64 19.68 3.90 652670.07 5973718.50 D: 3502.20 3502.04 19.70 3.79 652670.09 5973718.40 D: 3519.70 3519.54 19.71 3.69 652670.11 5973718.30 0: 3537.30 3537.14 19.73 3.58 652670.13 5973718.19 0: 3554.80 3554.64 19.73 3.45 652670.14 5973718.06 0: 3572.30 3572.14 19.72 3.31 652670.13 5973717.92 D: 3589.90 3589.74 19.70 3.15 652670.11 5973717.76 0: 3607.40 3607.24 19.69 2.99 652670.10 5973717.59 D: 3624.90 3624.74 19.67 2.83 652670.09 5973717.43 0: 3642.40 3642.23 19.65 2.66 652670.07 5973717.26 page 3 ( {' F-45A plan 3 xy.txt D: 3659.90 3659.73 19.62 2.48 652670.04 5973717.08 D: 3677.40 3677.23 19.59 2.31 652670.02 5973716.91 D: 3695.00 3694.83 19. 57 2.13 652670.00 5973716.74 D: 3712.50 3712.33 19.55 1.97 652669.98 5973716.57 D: 3730.00 3729.83 19.53 1.82 652669.96 5973716.42 D: 3747.50 3747.33 19.51 1.67 652669.95 5973716.27 D: 3765.00 3764.83 19.49 1. 53 652669.93 5973716.13 D: 3782.40 3782.23 19.48 1.40 652669.93 5973716.00 D: 3799.50 3799.33 19.48 1.27 652669.93 5973715.87 D: 3816.60 3816.43 19.48 1.14 652669.93 5973715.74 D: 3833.80 3833.63 19.48 1.02 652669.93 5973715.62 D: 3851. 00 3850.83 19.48 0.91 652669.93 5973715.51 D: 3868.20 3868.03 19.47 0.80 652669.93 5973715.40 D: 3885.50 3885.33 19.47 0.68 652669.93 5973715.28 D: 3902.70 3902.53 19.47 0.56 652669.93 5973715.16 D: 3919.90 3919.73 19.46 0.45 652669.93 5973715.05 D: 3937.20 3937.03 19.46 0.36 652669.93 5973714.96 D: 3954.40 3954.22 19.46 0.28 652669.93 5973714.88 D: 3971.60 3971.42 19.45 0.21 652669.92 5973714.81 D: 3988.80 3988.62 19.45 0.15 652669.92 5973714.75 D: 4006.00 4005.82 19.43 0.08 652669.91 5973714.68 D: 4023.10 4022.92 19.42 0.01 652669.89 5973714.60 D: 4040.30 4040.12 19.40 -0.07 652669.87 5973714.52 D: 4057.50 4057.32 19.37 -0.15 652669.85 5973714.45 D: 4074.80 4074.62 19.34 -0.24 652669.81 5973714.36 D: 4092.00 4091.82 19.28 -0.35 652669.77 5973714.25 D: 4109.20 4109.02 19.23 -0.49 652669.71 5973714.11 D: 4126.30 4126.12 19.16 -0.64 652669.65 5973713.96 D: 4143. 50 4143.32 19.09 -0.79 652669.58 5973713.80 D: 4160.60 4160.42 19.01 -0.94 652669.50 5973713.65 D: 4177.80 4177.62 18.93 -1.09 652669.43 5973713.50 D: 4195.00 4194.82 18.85 -1. 23 652669.35 5973713.36 D: 4212.10 4211. 92 18.77 -1. 37 652669.27 5973713.22 D: 4229.40 4229.22 18.68 -1. 51 652669.19 5973713.08 D: 4246.60 4246.42 18.59 -1.64 652669.10 5973712.94 D: 4263.80 4263.62 18.50 -1. 78 652669.01 5973712.80 D: 4281. 00 4280.81 18.40 -1.90 652668.92 5973712.67 D: 4298.20 4298.01 18.31 -2.03 652668.83 5973712.55 D: 4315.50 4315.31 18.23 -2.15 652668.74 5973712.43 D: 4332.60 4332.41 18.14 -2.26 652668.66 5973712.31 D: 4349.80 4349.61 18.05 -2.38 652668.57 5973712.19 D: 4367.00 4366.81 17.95 -2.50 652668.47 5973712.07 D: 4384.20 4384.01 17.84 -2.63 652668.37 5973711.94 D: 4401.50 4401. 31 17.75 -2.74 652668.28 5973711.82 D: 4418.70 4418.51 17.64 -2.85 652668.18 5973711.72 D: 4435.90 4435.71 17.51 -2.97 652668.05 5973711.59 D: 4453.10 4452.91 17.35 -3.13 652667.89 5973711.43 D: 4470.30 4470.10 17.17 -3.32 652667.71 5973711. 23 D: 4487.50 4487.30 16.96 -3.53 652667.51 5973711.02 D: 4504.60 4504.40 16.75 -3.75 652667.30 5973710.79 D: 4521.80 4521. 60 16.54 -3.98 652667.10 5973710.57 D: 4538.80 4538.59 16.34 -4.18 652666.90 5973710.36 D: 4555.70 4555.49 16.16 -4.37 652666.72 5973710.16 D: 4572.70 4572.49 15.96 -4.58 652666.53 5973709.95 D: 4589.70 4589.49 15.75 -4.80 652666.32 5973709.72 D: 4606.60 4606.38 15.54 -5.03 652666.12 5973709.49 D: 4623.60 4623.38 15.33 -5.26 652665.91 5973709.25 D: 4640.50 4640.28 15.12 -5.50 652665.70 5973709.01 D: 4657.50 4657.28 14.90 -5.75 652665.50 5973708.76 D: 4674.40 4674.17 14.69 -6.00 652665.29 5973708.51 D: 4691. 40 4691.17 14.49 -6.26 652665.09 5973708.24 D: 4708.40 4708.17 14.28 -6.52 652664.89 5973707.97 D: 4725.30 4725.06 14.08 -6.78 652664.69 5973707.71 D: 4742.30 4742.06 13.89 -7.03 652664.51 5973707.46 D: 4759.20 4758.96 13'.73 -7.26 652664.35 5973707.23 D: 4776.10 4775.86 13.58 -7.48 652664.21 5973707.01 D: 4793.10 4792.85 13.45 -7.68 652664.09 5973706.80 D: 4810.00 4809.75 13.34 -7.86 652663.98 5973706.62 D: 4826.90 4826.65 13.24 -8.02 652663.88 5973706.46 D: 4843.80 4843.55 13.15 -8.16 652663.79 5973706.32 page 4 F-45A plan 3 xy.txt 0: 4860.70 4860.45 13.06 -8.29 652663.70 5973706.18 0: 4877.60 4877.35 12.97 -8.42 652663.62 5973706.05 0: 4894.50 4894.25 12.90 -8.52 652663.54 5973705.94 0: 4911.40 4911.15 12.83 -8.60 652663.48 5973705.86 0: 4928.30 4928.05 12.78 -8.66 652663.44 5973705.81 0: 4945.30 4945.05 12.74 -8.71 652663.39 5973705.76 0: 4962.30 4962.05 12.70 -8.75 652663.35 5973705.71 0: 4979.20 4978.95 12.65 -8.78 652663.31 5973705.68 D: 4996.20 4995.95 12.62 -8.81 652663.27 5973705.65 0: 5013.20 5012.95 12.58 -8.85 652663.24 5973705.61 0: 5030.20 5029.95 12.55 -8.89 652663.21 5973705.57 0: 5047.20 5046.95 12.52 -8.93 652663.18 5973705.53 0: 5064.20 5063.95 12.48 -8.96 65"2663.14 5973705.50 D: 5081.20 5080.95 12.41 -8.98 652663.07 5973705.48 0: 5098.30 5098.05 12.31 -8.96 652662.97 5973705.49 0: 5115.30 5115.05 12.18 -8.92 652662.84 5973705.53 0: 5132.30 5132.05 12.04 -8.86 652662.69 5973705.59 D: 5149.40 5149.14 11.90 -8.78 652662.56 5973705.67 0: 5166.40 5166.14 11. 77 -8.69 652662.42 5973705.76 0: 5183.50 5183.24 11.65 -8.59 652662.30 5973705.85 0: 5200.50 5200.24 11.52 -8~49 652662.17 5973705.95 D: 5217.50 5217.24 11. 39 -8.39 652662.04 5973706.05 D: 5234.50 5234.24 11.26 -8.28 652661.91 5973706.16 0: 5251.60 5251.34 11.13 -8.15 652661.77 5973706.28 0: 5268.60 5268.34 10.99 -8.02 652661.63 5973706.41 D: 5285.40 5285.14 10.85 -7.88 652661.49 5973706.55 D: 5302.20 5301.94 10.72 -7.74 652661. 35 5973706.68 0: 5319.00 5318.74 10.60 -7.60 652661. 23 5973706.82 D: 5335.80 5335.53 10.49 -7.46 652661.12 5973706.95 0: 5352.70 5352.43 10.39 -7.32 652661.02 5973707.10 0: 5369.50 5369.23 10.30 -7.17 652660.92 5973707.24 D: 5386.40 5386.13 10.22 -7.02 652660.84 5973707.39 D: 5403.20 5402.93 10.15 -6.88 652660.77 5973707.53 0: 5420.10 5419.83 10.09 -6.73 652660.71 5973707.68 D: 5437.00 5436.73 10.04 -6.57 652660.65 5973707.84 D: 5453.90 5453.63 9.98 -6.41 652660.59 5973708.00 D: 5470.70 5470.43 9.94 -6.25 652660.54 5973708.16 D: 5487.60 5487.33 9.89 -6.08 652660.50 5973708.32 D: 5504.50 5504.23 9.86 -5.93 652660.45 5973708.48 D: 5521.40 5521.13 9.82 -5.77 652660.42 5973708.63 D: 5538.20 5537.92 9.79 -5.62 652660.38 5973708.78 D: 5555.00 5554.72 9.76 -5.48 652660.35 5973708.93 D: 5571. 80 5571.52 9.73 -5.34 652660.32 5973709.07 D: 5588.70 5588.42 9.71 -5.20 652660.29 5973709.21 0: 5605.50 5605.22 9.68 -5.05 652660.26 5973709.35 D: 5622.30 5622.02 9.65 -4.90 652660.23 5973709.50 0: 5639.20 5638.92 9.63 -4.75 652660.20 5973709.65 D: 5656.10 5655.82 9.60 -4.60 652660.17 5973709.80 D: 5673.00 5672.72 9.58 -4.44 652660.15 5973709.96 D: 5689.90 5689.62 9.56 -4.27 652660.13 5973710.13 0: 5706.70 5706.42 9.54 -4.10 652660.10 5973710.30 D: 5723.60 5723.32 9.52 -3.93 652660.07 5973710.46 0: 5740.50 5740.22 9.50 -3.77 652660.05 5973710.62 D: 5757.30 5757.02 9.48 -3.61 652660.03 5973710.78 D: 5774.20 5773.91 9.45 -3.46 652660.00 5973710.94 D: 5791.00 5790.71 9.43 -3.31 652659.98 5973711.09 0: 5807.80 5807.51 9.41 -3.18 652659.95 5973711. 22 D: 5824.70 5824.41 9.40 -3.05 652659.94 5973711. 34 D: 5841. 50 5841.21 9.39 -2.93 652659.93 5973711. 46 0: 5858.20 5857.91 9.38 -2.82 652659.91 5973711.58 0: 5875.00 5874.71 9.37 -2.71 652659.90 5973711.68 D: 5891.80 5891.51 9.37 -2.61 652659.90 5973711.78 D: 5908.50 5908.21 9.38 -2.53 652659.91 5973711. 86 D: 5925.30 5925.01 9.45 -2.47 652659.98 5973711. 93 0: 5942.00 5941.71 9.61 -2.45 652660.14 5973711. 95 D: 5958.90 5958.61 9.93 -2.52 652660.46 5973711. 89 0: 5975.70 5975.40 10.46 -2.75 652661.00 5973711. 67 D: 5992.60 5992.27 11.21 -3.18 652661.76 5973711. 25 D: 6009.20 6008.84 12.08 -3.78 652662.63 5973710.67 D: 6025.80 6025.40 13.01 -4.45 652663.57 5973710.02 page 5 ~. F-45A plan 3 xy.txt D: 6042.40 6041.96 13.98 -5.14 652664.56 5973709.34 D: 6059.00 6058.51 15.01 -5.87 652665.60 5973708.64 D: 6075.60 6075.05 16.13 -6.68 652666.74 5973707.85 D: 6092.20 6091.58 17.40 -7.62 652668.03 5973706.94 D: 6108.80 6108.08 18.83 -8.68 652669.49 5973705.91 D: 6125.70 6124.86 20.41 -9.88 652671.09 5973704.75 D: 6142.90 6141. 93 22.09 -11.16 652672.79 5973703.50 D: 6160.00 6158.90 23.80 -12.47 652674.53 5973702.22 D: 6166.90 6165.74 24.50 -13.00 652675.23 5973701.70 D: 6175.60 6174.37 25.38 -13.68 652676.13 5973701.04 D: 6193.60 6192.22 27.23 -15.10 652678.00 5973699.66 D: 6211. 70 6210.16 29.11 -16.58 652679.92 5973698.22 D: 6229.60 6227.89 31.04 -18.14 652681. 88 5973696.70 D: 6248.30 6246.38 33.16 -19.94 652684.03 5973694.94 D: 6268.40 6266.22 35.56 -22.08 652686.48 5973692.86 D: 6288.60 6286.13 38.08 -24.39 652689.04 5973690.60 D: 6308.80 6306.02 40.66 -26.81 652691. 67 5973688.23 D: 6329.80 6326.68 43.38 -29.40 652694.45 5973685.69 D: 6351. 40 6347.92 46.23 -32.11 652697.34 5973683.04 D: 6374.00 6370.12 49.30 -35.02 652700.48 5973680.19 D: 6396.70 6392.36 52.59 -38.10 652703.83 5973677.19 D: 6419.50 6414.64 56.19 -41.36 652707.49 5973674.00 D: 6442.30 6436.85 60.02 -44.79 652711.40 5973670.65 D: 6465.30 6459.21 64.08 -48.35 652715.52 5973667.17 D: 6488.30 6481. 52 68.27 -52.03 652719.79 5973663.57 D: 6512.60 6505.04 72.86 -56.11 652724.46 5973659.59 D: 6537.30 6528.85 77.72 -60.53 652729.41 5973655.27 D: 6562.00 6552.55 82.77 -65.28 652734.55 5973650.63 D: 6586.80 6576.28 87.97 -70.30 652739.85 5973645.71 D: 6612.30 6600.62 93.37 -75.63 652745.37 5973640.50 D: 6641.10 6628.07 99.54 -81.78 652751. 66 5973634.47 D: 6671. 40 6656.87 106.19 -88.45 652758.44 5973627.94 D: 6701.90 6685.69 113.27 -95.50 652765.66 5973621.04 D: 6731.90 6713.76 120.86 -102.87 652773.39 5973613.82 D: 6762.00 6741. 60 129.20 -110.71 652781.89 5973606.16 D: 6792.00 6769.06 138.15 -118.82 652791.01 5973598.23 D: 6822.00 6796.33 147.60 -127.00 652800.63 5973590.24 D: 6852.00 6823.51 157.41 -135.06 652810.60 5973582.39 D: 6882.00 6850.66 167.44 -142.94 652820.78 5973574.71 D: 6912.00 6877.83 177.53 -150.71 652831.03 5973567.15 D: 6942.20 6905.20 187.64 -158.49 652841.29 5973559.58 D: 6972.30 6932.50 197.66 -166.27 652851.46 5973552.00 D: 7002.50 6959.88 207.68 -174.13 652861.65 5973544.35 D: 7032.70 6987.25 217.70 -182.02 652871.82 5973536.66 D: 7062.90 7014.63 227.68 -189.94 652881.97 5973528.95 D: 7093.10 7042.04 237.59 -197.87 652892.03 5973521.22 D: 7123.30 7069.49 247.36 -205.82 652901.96 5973513.48 D: 7153.40 7096.89 256.97 -213.75 652911.73 5973505.74 D: 7183.50 7124.30 266.50 -221.71 652921.42 5973497.98 D: 7213.70 7151.83 275.99 -229.73 652931.07 5973490.16 0: 7243.80 7179.28 285.37 -237.75 652940.61 5973482.33 D: 7274.00 7206.85 294.69 -245.83 652950.09 5973474.44 0: 7304.10 7234.35 303.89 -253.89 652959.45 5973466.57 D: 7334.30 7261. 99 313.05 -261. 93 652968.77 5973458.72 0: 7364.40 7289.55 322.18 -269.85 652978.06 5973450.98 D: 7394.60 7317.22 331.37 -277.72 652987.41 5973443.30 0: 7424.50 7344.63 340.46 -285.47 652996.65 5973435.75 0: 7454.10 7371. 78 349.41 -293.17 653005.76 5973428.23 0: 7483.70 7398.89 358.28 - 301. 07 653014.78 5973420.51 0: 7513.10 7425.75 367.00 -309.22 653023.67 5973412.54 D: 7542.50 7452.52 375.71 -317.71 653032.55 5973404.23 D: 7571.90 7479.19 384.44 -326.47 653041.46 5973395.65 0: 7601. 30 7505.78 393.20 -335.45 653050.40 5973386.85 0: 7630.90 7532.49 402.04 -344.66 653059.42 5973377.83 0: 7660.50 7559.17 410.88 -353.94 653068.44 5973368.72 D: 7690.10 7585.84 419.70 -363.26 653077.46 5973359.58 0: 7719.60 7612.43 428.48 -372.56 653086.42 5973350.46 D: 7749.20 7639.11 437.27 - 381. 89 653095.40 5973341. 32 D: 7779.10 7666.06 446.14 - 391. 30 653104.46 5973332.09 D: 7809.20 7693.22 455.06 -400.75 653113.56 5973322.83 page 6 { F-45A plan 3 xy.txt D: 7839.40 7720.47 463.98 -410.22 653122.68 5973313.54 D: 7869.60 7747.70 472.89 -419.76 653131.78 5973304.19 D: 7899.80 7774.92 481.77 -429.38 653140.85 5973294.75 D: 7930.20 7802.31 490.65 -439.13 653149.93 5973285.18 D: 7960.60 7829.69 499.47 -448.96 653158.94 5973275.54 D: 7991. 00 7857.07 508.20 -458.86 653167.88 5973265.81 D: 8021. 30 7884.36 516.83 -468.83 653176.71 5973256.02 D: 8051.70 7911.71 525.40 -478.94 653185.48 5973246.09 D: 8082.00 7938.97 533.85 -489.13 653194.14 5973236.08 D: 8112.00 7965.94 542.13 -499.33 653202.62 5973226.05 D: 8141.70 7992.62 550.26 -509.54 653210.96 5973216.01 D: 8171. 40 8019.29 558.32 -519.83 653219.22 5973205.88 D: 8201.10 8045.95 566.30 -530.20 653227.41 5973195.68 D: 8230.80 8072.61 574.21 -540.63 653235.53 5973185.41 D: 8260.60 8099.36 582.04 -551.17 653243.58 5973175.03 D: 8290.40 8126.11 589.78 - 561. 79 653251.53 5973164.57 D: 8318.29 8151.13 596.91 - 571. 83 653258.86 5973154.69 D: 8342.40 8172.76 603.00 -580.58 653265.12 5973146.06 D: 8362.50 8190.78 608.01 -587.92 653270.29 5973138.82 D: 8379.50 8206.02 612.21 -594.18 653274.62 5973132.65 D: 8396.60 8221. 35 616.38 -600.50 653278.91 5973126.41 D: 8413.70 8236.68 620.49 -606.87 653283.15 5973120.13 D: 8430.80 8252.00 624.55 -613.29 653287.33 5973113.79 D: 8447.80 8267.24 628.49 -619.71 653291. 41 5973107.46 D: 8464.90 8282.58 632.39 -626.18 653295.43 5973101. 07 D: 8482.00 8297.92 636.22 -632.70 653299.40 5973094.63 D: 8501.00 8314.96 640.41 -640.00 653303.74 5973087.42 D: 8523.00 8334.68 645.17 -648.50 653308.67 5973079.02 D: 8548.60 8357.64 650.59 -658.45 653314.28 5973069.18 D: 8576.79 8382.93 656.39 -669.45 653320.32 5973058.30 D: 8605.10 8408.35 662.06 -680.55 653326.20 5973047.32 D: 8633.40 8433.76 667.56 -691.73 653331.93 5973036.25 D: 8661. 80 8459.24 672.94 -703.08 653337.54 5973025.02 D: 8690.20 8484.68 678.17 -714.54 653343.00 5973013.66 D: 8718.70 8510.17 683.32 -726.22 653348.39 5973002.10 D: 8747.30 8535.66 688.46 -738.12 653353.77 5972990.31 D: 8775.80 8561. 01 693.58 -750.10 653359.13 5972978.43 D: 8803.80 8585.90 698.60 -761. 90 653364.39 5972966.73 D: 8831. 80 8610.79 703.66 -773.69 653369.69 5972955.05 D: 8860.00 8635.83 708.84 -785.58 653375.11 5972943.27 D: 8888.10 8660.72 714.14 -797.49 653380.65 5972931.47 D: 8916.10 8685.44 719.60 -809.46 653386.36 5972919.62 D: 8944.20 8710.15 725.27 -821.58 653392.27 5972907.62 D: 8972.20 8734.68 731.10 -833.75 653398.34 5972895.57 D: 9000.29 8759.20 737.10 -846.08 653404.60 5972883.36 D: 9028.39 8783.62 743.25 -858.54 653410.99 5972871.03 D: 9056. SO 8807.95 749.51 -871.15 653417.51 5972858.55 D: 9084.70 8832.24 755.92 -883.97 653424.18 5972845.87 D: 9112.89 8856.39 762.49 -896.94 653431.01 5972833.03 D: 9141.00 8880.33 769.21 -910.04 653438.00 5972820.07 D: 9169.20 8904.22 776.13 -923.35 653445.18 5972806.91 D: 9197.29 8927.87 783.19 -936.76 653452.51 5972793.65 D: 9225.50 8951.48 790.44 -950.38 653460.04 5972780.17 D: 9250.00 8971.87 796.90 -962.34 653466.74 5972768.36 D: 9260.00 8979.97 799.70 -967.49 653469.64 5972763.27 D: 9264.00 8983.09 800.89 -969.68 653470.88 5972761.09 D: 9270.00 8987.66 802.70 -973.13 653472.76 5972757.69 D: 9280.00 8994.96 805.64 -979.29 653475.83 5972751. 59 D: , 9290.00 9001. 86 808.49 -985.94 653478.81 5972745.00 D: 9300.00 9008.33 811. 23 -993.05 653481.70 5972737.94 D: 9304.00 9010.79 812.29 -996.02 653482.82 5972734.99 D: 9310.00 9014.34 813.84 -1000.60 653484.45 5972730.44 D: 9320.00 9019.89 816.25 -1008.56 653487.03 5972722.54 D: 9330.00 9024.96 818.46 -1016.90 653489.40 5972714.25 D: 9340.00 9029.52 820.44 -1025.57 653491.56 5972705.62 D: 9350.00 9033.56 822.20 -1034.54 653493.50 5972696.69 D: 9360.00 9037.06 823.72 -1043.78 653495.22 5972687.48 D: 9370.00 9040.01 825.01 -1053.25 653496.69 5972678.04 D: 9380.00 9042.38 826.05 -1062.91 653497.93 5972668.41 D: 9390.00 9044.19 826.84 -1072.71 653498.92 5972658.62 page 7 (' F-45A plan 3 xy.txt D: 9400.00 9045.40 827.37 -1082.62 653499.65 5972648.73 D: 9410.00 9046.03 827.65 -1092.59 653500.14 5972638.76 D: 9415.62 9046.13 827.70 -1098.21 653500.29 5972633.14 D: 9420.00 9046.13 827.64 -1102.59 653500.32 5972628.77 D: 9430.00 9046.13 827.04 -1112.57 653499.93 5972618.78 D: 9440.00 9046.13 825.80 -1122.49 653498.89 5972608.83 D: 9450.00 9046.13 823.92 -1132.31 653497.21 5972598.98 D: 9460.00 9046.13 821. 41 -1141.99 653494.90 5972589.25 D: 9470.00 9046.13 818.28 -1151.49 653491.97 5972579.69 D: 9480.00 9046.13 814.55 -1160.76 653488.43 5972570.34 D: 9490.00 9046.13 810.23 -1169.78 653484.29 5972561. 24 D: 9500.00 9046.13 805.33 -1178.49 653479.57 5972552.43 D: 9510.00 9046.13 799.88 -1186.88 653474.29 5972543.94 D: 9515.62 9046.13 796.58 -1191.43 653471. 09 5972539.32 D: 9525.00 9046.13 791. 07 -1199.01 653465.73 5972531. 63 D: 9540.62 9046.13 782.44 -1212.04 653457.37 5972518.43 D: 9550.00 9046.13 777.35 -1219.91 653452.44 5972510.46 D: 9575.00 9046.11 762.54 -1240.04 653438.04 5972490.03 D: 9600.00 9046.08 746.03 -1258.81 653421. 92 5972470.93 D: 9625.00 9046.04 727.96 -1276.07 653404.20 5972453.31 D: 9650.00 9045.98 708.44 -1291. 68 653385.01 5972437.31 D: 9675.00 9045.91 687.64 -1305.53 653364.50 5972423.03 D: 9700.00 9045.83 665.71 -1317.52 653342.82 5972410.60 D: 9725.00 9045.73 642.82 -1327.56 653320.14 5972400.10 D: 9750.00 9045.62 619.15 -1335.55 653296.63 5972391.63 D: 9775.00 9045.49 594.86 -1341.46 653272.48 5972385.23 D: 9800.00 9045.36 570.16 -1345.22 653247.85 5972380.96 D: 9825.00 9045.22 545.21 -1346.82 653222.95 5972378.86 D: 9850.00 9045.07 520.23 -1346.24 653197.96 5972378.93 D: 9875.00 9044.91 495.39 -1343.48 653173.07 5972381.18 D: 9900.00 9044.75 470.89 .-1338.57 653148.48 5972385.59 D: 9925.00 9044.58 446.90 -1331. 54 653124.36 5972392.13 D: 9940.62 9044.47 432.26 -1326.10 653109.61 5972397.27 D: 9950.00 9044.41 423.62 -1322.45 653100.90 5972400.74 D: 9975.00 9044.28 401. 23 -1311. 37 653078.28 5972411.37 D: 10000.00 9044.19 379.88 -1298.37 653056.68 5972423.93 D: 10025.00 9044.15 359.75 -1283.56 653036.25 5972438.32 D: 10050.00 9044.15 340.98 -1267.06 653017.15 5972454.44 D: 10075.00 9044.20 323.72 -1248.98 652999.53 5972472.16 D: 10100.00 9044.30 308.10 -1229.47 652983.52 5972491.35 D: 10125.00 9044.44 294.25 -1208.67 652969.24 5972511. 86 D: 10140.62 9044.55 286.53 -1195.09 652961. 25 5972525.28 D: 10150.00 9044.62 282.20 -1186.77 652956.76 5972533.51 D: 10175.00 9044.82 271.47 -1164.20 652945.57 5972555.86 D: 10200.00 9045.01 261. 93 -1141.09 652935.56 5972578.76 D: 10225.00 9045.19 253.62 -1117.52 652926.77 5972602.16 D: 10250.00 9045.38 246.55 -1093.54 652919.22 5972625.99 D: 10275.00 9045.57 240.75 -1069.23. 652912.92 5972650.17 D: 10300.00 9045.75 236.23 -1044.64 652907.90 5972674.66 D: 10325.00 9045.93 233.00 -1019.86 652904.17 5972699.37 D: 10350.00 9046.10 231. 07 -994.94 652901. 73 5972724.25 D: 10375.00 9046.27 230.45 -969.95 652900.60 5972749.22 D: 10400.00 9046.44 231.14 -944.96 652900.78 5972774.21 D: 10425.00 9046.60 233.13 -920.04 652902.27 5972799.16 D: 10440.62 9046.70 235.04 -904.54 652903.86 5972814.70 D: 10450.00 9046.75 236.24 -895.24 652904.88 5972824.02 D: 10475.00 9046.91 238.56 -870.35 652906.69 5972848.95 D: 10500.00 9047.06 239.58 -845.37 652907.20 5972873.94 D: 10525.00 9047.21 239.28 -820.38 652906.39 5972898.92 D: 10550.00 9047.37 237.68 -795.43 652904.28 5972923.83 D: 10575.00 9047.51 234.78 -770.61 652900.87 5972948.59 D: 10600.00 9047.66 230.58 -745.96 652896.17 5972973.14 D: 10625.00 9047.81 225.09 -721. 58 652890.19 5972997.41 D: 10650.00 9047.95 218.34 -697.51 652882.95 5973021. 33 D: 10675.00 9048.09 210.33 -673.83 652874.47 5973044.84 D: 10690.62 9048.17 204.71 -659.26 652868.55 5973059.30 D: 10700.00 9048.22 201. 27 -650.53 652864.94 5973067.95 D: 10725.00 9048.35 192.96 -626.96 652856.14 5973091. 35 D: 10750.00 9048.49 185.89 -602.98 652848.59 5973115.18 D: 10775.00 9048.62 180.09 -578.67 652842.29 5973139.36 page 8 ( F-45A plan 3 xy.txt 0: 10800.00 9048.75 175.57 -554.08 652837.27 5973163.85 0: 10825.00 9048.88 172.34 -529.29 652833.54 5973188.56 D: 10850.00 9049.01 170.41 -504.37 652831.10 5973213.44 0: 10875.00 9049.13 169.79 -479.38 652829.97 5973238.41 0: 10900.00 9049.25 170.47 -454.40 652830.15 5973263.40 D: 10925.00 9049.37 172.47 -429.48 652831.64 5973288.36 0: 10940.62 9049.45 174.38 -413.97 652833.23 5973303.89 0: 10950.00 9049.49 175.58 -404.67 652834.25 5973313.22 D: 10975.00 9049.61 177.90 -379.79 652836.06 5973338.14 D: 11000.00 9049.72 178.92 -354.81 652836.57 5973363.13 0: 11025.00 9049.84 178.62 -329.81 652835.76 5973388.12 0: 11050.00 9049.95 177.02 -304.87 652833.65 5973413.02 0: 11075.00 9050.06 174.11 -280.04 65'2830.24 5973437.78 0: 11100.00 9050.17 169.91 -255.40 652825.54 5973462.33 0: 11125.00 9050.28 164.43 -231. 01 652819.56 5973486.60 0: 11150.00 9050.39 157.67 -206.94 652812.32 5973510.53 page 9 Weill I 13" 5000 psi " ,';',',,.:-,":' :::';'<i'::,' ":::;::,:::::1:':>:,::<,.' :":;{:::::,:;::i:,:'::i::::Y: '; I : I ': I:: ~ ,: : I :; ¡:';:,::' " ¡ "1 ";,'¡¡:',:",:i' 1'1:":'1:"" I ~:I:"!:¡'li"¡' , li,I!II'I':I,' "1"";,1,':,1 I ~ BOP-Tree ~ 'ODDf ) I '-J ~ I~ I '- '2.. I I I I ,~,,'~ KB Elevation I I Rig Floor I Lubricator ID = 6.375" with 6" Otis Unions .,",::,,','; " .., /~ 171/16" 5000 psi BOP's. ID = 7.06" .~ 1711~:0::i~::e : 1.1 "';11116" 5000 psi RX-46 I J"':'I:::·,)1, ~ ..;.,: Choke Ll'ne I J."""''''I'''''I:':;I':):';''.~'li1,:" I', ,¡I 1:"1""" ",,1 "'", 1"'11~1 "",1'1',"""'''''''-''''''.''''''''''',:,'''';'''',:""""""""""":",1", ,1,1,,:' ':,l I ./ 1'::'Y'l':'ë~¡ . "11I111 .1 121/16" 5000 psi, RX-24 I I /i I"'::"::':;"':":"""¡'-::""';"""~" ,:1"'111 "'iI""""1 1,1;. I I I I . 7 1/16" 5000 psi (RX-46) or 4 1/16" 5000 psi (RX-39) I Swab Valve I Tree Size I -. SSV I I Base Flange I Master Valve I I I Page 1 ~------..-...-~.~.,~-... ~--~~~'_.'-"""""~' DI\TE CHECK 1\10. P0550 11 .;F» C· \, "\ ... ./J ,_ 12/19/2002 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS VENDOR -- DISCOUNT ___~I=~=--=_' [\ E"i:==~~~-~~~:= ----.-- 12/19/2002 INV# CK1217020 PERMIT TO DRILL FEE If~ -'.. i i in~"~'fl\(;¡I~I~ (;'I~~:I~I~-':I\~~~~f ,;)~~;"MS DESC"'BE~ ____~==~=---- __ -- -- ---==-I:~-~:_~-_ -:-:-:-: ---. ._.---- ---_.~--~.__.__. .'- _.------ ~.--~-~-~-~._~-~---~-_.~ UP EXPLOHAT10N, (ALASKA) INC. PHlJDHOE BAY UNll FJt) BOX 1966-12 J\NCHOHAGE, AK 99519-6612 NATIONAL CITY BANK Ashland, Ohio 56-389 412 No.,P 055011 CONSOLIDATED COMMERCIAL ACCOUNT PAY: r'l. P r;' ".. ...... .f u:'" tJ . , ~ ~ltlll' ...ff,-~Ii'f. 1.".,1 _~___ D6TE ------ AMOUNT ----~-------'~--·--·----·-----ï ***************$100.00***1 ----------.1 NTIAŠ~~;.'20 DAYS. ~,.-.. ". .-- (·::~:::·::'L~,:}L· , December 19,2002 TO THE ORDER ~ OF: ALASKA OIL & GAS CONSERVATION COMMISSION 333 W 7TH AVENUE SUITE 100 ANCHORAGE, AK 99501 .- -- ~._~------~.--~.--..._~--- -. ----------- --~--~-~- III 0 5 SOb ~ II' !: 0 ~ 1 2 0 j a q 5 I: o. 2 ? a q b "e Rev: 07/10/02 C\jody\templates :( TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME PTD# CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) "CLUE" The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to be reported as a function' of the original API Dumber stated above. HOLE In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number·' (50 70/80) from records, data and logs acquired for well (name on permit). paOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where, samples are first caught and 10' sample intervals through target zones. WELL PERMIT CHECKLIST COMPANY .A~y WELL NAME~¿'¡ .;::-- 71~.4 PROGRAM: Exp _ Dev.::;z( Redrll~ Re-Enter _ Serv _ Wellbore seg_ FIELD&POOL h<T'O/Ç(";) INITCLASS ÓPA../ /-017 GEOLAREA 97/J UNIT# //?fo ON/OFFSHORE.Q¿tj ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . . ~, N 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N 3. Unique well name and number. . . . . . . . . . . . . . . . . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N 12. Permit can be issued without administrative approval.. . . . . '-::!J N (Service Well Only) 13. Well located w/in area & strata authorized by injection order#_ 'J % µ)4. (Service Well Only) 14. All wells w/in X mile area of review identified. . . . . . . . .. ;t;, ~ ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . 10\ N 16. Surface casing protects all known USDWs. . . . . . . . . . W N 17. CMT vol adequate to circulate on conductor & surf csg. . . . V··N· N/R;- 18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . , N 19. CMT will cover all known productive horizons. . . . . . . . . . N 20. Casing designs adequate for C, T, B & permafrost. . . . . . . ,N Sf - L 21. Adequate tankage or reserve pit.. . . . . . . ~ . . . . . . . . . N aD u. 22. If a re-drill, has a 10-403 for abandonment been approved. . ., *"'. N 23. Adequate wellbore separation proposed.. . . . . . . . . . . . ,N 24. If diverter required, does it meet regulations. . . . . ',' .. . Y N ¡VIA- IJ I n I 25. Drilling fluid program schematic & equip list adequate. . . . . N {Jttf."ý fill. Jj.J -8 17 P PCZ 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N 27. BOPE press rating appropriate; test to 3500 psig. N 111 ~r '- ¿ 1 LR P f. t; I 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N 29. Work will occur without operation shutdown. . . . . . . . . . . N 30. Is presence ofH2S gas probable.. . . . . . . . . .. . . . . . N. 31. Mechanical condition of wells within AOR verified. . . . . . . . '¥ N Al//r- Y@ Y N Y þ, IJl Y N N APPR DATE ~~ APPR DATE ~GA- ~iR 105 (Service Well Only) GEOLOGY APPR D;~, /h 3~,-~ / tí=iproratory Only) 32. Permit can be issued w/o hydrogen sulfide measures. . . . . 33. Data presented on potential overpressure zones. . . . . . . . 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . 35. Seabed condition survey (if off-shore). . . . . . . . . . . . . . 36. Contact namelphone for weekly progress reports. ...... ( GE;?ty: PETROLEUM ENGINEERING: RESERVOIR E UIC ENGINEER C:pMMiJ~ Commentsllnstructions: RP t:: TM JH JR /' RR )~/r¡¡cl MW DS 0,11. -,8 SFD_ WA Rev: 2/25/03 \welLperm it_checklist i~ Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Pennitling Process but is part of the history file. To improve the readability of the Well History file and to simplify finding infomlation, infomlation of this nature is accumulated at the end of the file under APPEN,DIX. No special effort has been made to chronologically organize this category of information. **** REEL HEADER **** MWD 03/12/25 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 03/12/14 468898 01 2.375" CTK *** LIS COMMENT RECORD *** (903 ~-OL~( (p ( RECEIVED , , O(¡~~^:·i -, (. ,.I L. l...¡ ......... " .. .' Ataska Oil & Gas Cons. Commm Anchorage ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ~Version Information Remark File Version 1.000 Extract File: ldwg.las VERSo WRAP. 1.20: NO: NWell Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 9176.0000: STOP.FT 11151.5000: STEP.FT 0.5000: NULL. -999.2500: COMPo COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API . API NUMBER: ~Parameter Information Block #MNEM.UNIT #--------- SECT. TOWN.N RANG. PDAT. EPD .F LMF . FAPD.F DMF EKB .F EDF .F EGL .F CASE.F OS1 . OS2 . ~Remarks Value CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ------------------------------- Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska) Inc. F-45A Prudhoe Bay Unit 70 deg 20' 6.619" N 148 deg 45' 41.431" W North Slope Alaska Baker Hughes INTEQ 2.375" CTK 01-May-03 5002922142001 Description ------------------------- ------------------------------- 02 11N 13E MSL o RKB 65.71 KB 65.71 N/A 0.0 9250 DIRECTIONAL PRESSTEQ I Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 Other Services Line 2 (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All Gamma Ray data presented is Realtime data. (4) The 3" hole section of F-45A was kicked off from 3.5" liner at 9250' ~~~,~ MD (8905' ~ JD) and drilled to 11151' MD (8977( ;TVD) . (5) Baker Hughes Inteq utilized CoilTrak downhole tools and ADVANTAGE surface system. (6) Tools ran in the string included CCL, Electrical Disconnect and Circulating sub, a Drilling Performance Sub (inner and outer downhole pressure, downhole weight on bit, downhole temperature), a Gamma and Directional Sub, and an Orienting Sub with a near bit inclination sensor. (7) The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) recorded by SWS on May 03, 2003. (8) The interval from 11129' MD (8978' SSTVD) to 11151' MD (8978' SSTVD) was not logged due to sensor bit offset at TD MNEMONICS: GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units) ROPS -> Rate of Penetration, feet/hour TVD -> Subsea True Vertical Depth (SSTVD) , feet SENSOR OFFSETS: RUN GAMMA DIRECTIONAL 1 25.07 ft. 25.92 ft. 2 24.87 ft. 25.72 ft. 3 25.51 ft. 26.36 ft. 4 25.51 ft. 26.36 ft. 5 22.44 ft. 23.29 ft. 6 22.44 ft. 23.29 ft. 7 22.44 ft. 23.29 ft. 8 22.44 ft. 23.29 ft. 9 22.44 ft. 23.29 ft. 10 22.44 ft. 23.29 ft. 11 22.46 ft. 23.31 ft. 12 22.46 ft. 23.31 ft. CURVE SHIFT DATA OBSERVED, ACTUAL, 9253.15, 9254.2, 9301. 02, 9301. 44, 9302.71, 9303.55, 9306.28, 9306.28, 9311.32, 9312.79, 9484.84, 9487.15, 9680.48, 9679.85, 9694.98,9694.14, 9698.56, 9698.77, 9711.11, 9711. 95, 9726.7, 9727.12, 9820.29, 9819.03, 9827.47, 9828.1, 9999.1, 10006.9, 10606.5, 10605.6, 10671.3, 10677, 10847.8, 10843.1, 10871.7, 10866.5, EOZ END DISPLACEMENT 1.05078 0.420898 0.84082 o 1. 4707 2.31152 -0.630859 -0.84082 0.209961 0.84082 0.420898 -1.26074 0.630859 7.77637 -0.84082 5.6748 -4.62402 -5.25488 ! BASE CURVE: GROH, OFFSET CURVE: GRCX Tape Subfile: 1 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 107 records... 8 bytes 132 bytes 42 bytes 4124 bytes Minimum record length: Maximum record length: 57 records... Tape Subfile: 2 **** FILE TRAILER **** feet Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 9176.000000 11151.000000 0.500000 48 Total Data Records: 8 ------- 4 4 4 4 ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR Size Length 0.500 * F FRAME SPACE = Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 * FORMAT RECORD (TYPE# 64) 0.0 0.0 GRAXOl ROPAOl GR ROP GR ROP ---------------------------------------------------- ODEP *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM !!! !! !!! !! !! !!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) recorded by SWS, 03-MAY-03 *** LIS COMMENT RECORD *** mwd.xtf 150 BP Exploration (Alaska) Inc. F-45A Prudhoe Bay Unit North Slope Alaska WDFN LCC CN WN FN COUN STAT ------------------------------------ *** INFORMATION TABLE: CONS MNEM VALU 1024 Tape Subfile: 3 57 records... **** FILE TRAILER **** feet Tape File start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 9176.000000 11151.000000 0.500000 48 Total Data Records: FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GRAX MWD 68 1 AAPI 4 4 2 RaPS MWD 68 1 F/HR 4 4 ------- 8 Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 * FORMAT RECORD (TYPE# 64) 0.0 0.0 GRAX ROPA GRAX ROPS GRAX ROPS ---------------------------------------------------- ODEP *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM !! !! !!! !! !!!!!! !!!! Remark File Version 1.000 This file contains the raw-unedited field data. *** LIS COMMENT RECORD *** raw.xtf 150 BP Exploration (Alaska) F-45A Prudhoe Bay Unit North Slope Alaska WDFN LCC CN WN FN COUN STAT -------------------------------- *** INFORMATION TABLE: CONS MNEM VALU 1024 MWD .002 **** FILE HEADER **~ '. ¡ Minimum record length( Maximum record length: **** TAPE TRAILER **** MWD 03/12/14 468898 01 **** REEL TRAILER **** MWD 03/12/25 BHI 01 Tape Subfile: 4 Minimum record length: Maximum record length: 42 bytes 4124 bytes 2 records... 132 bytes 132 bytes