Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-020
Image'" .'bject Well History File C...~er Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
JQJ.. - OJ. 0 Well History File Identifier
Organizing (done)
o Two-sided 11I111111I111111111
~scan Needed
1
R~CAN
~ Color Items:
o Greyscale Items:
DIGITAL DATA
~Sketles. No. ~
o Other, NolType:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
Scanning Preparation
.~
x 30 = &ð
o Other::
Date: ~ ¡z 0S-- /s/ vwJ
, 1'1 1
Date: <6( I ~ DS /s/ V11 ~
+?-3 = TPT~ PAGES g- 3
(CounY1ße) ",ot i clude C.over sheet~ II A ()
Date: '!5 '7 OS 151 VV~,
111- -
BY:
Helen ~
Project Proofing
BY:
Helen~
BY:
Helen ~ia. )
BY:
Production Scanning
Stage 1 Page Count from Scanned File: Y; if (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES I NO
Helen ~ Date: ~ I 7 , ()6 /s/ Vì1 ~
If NO in stage 1, page(s) discrepancies were found: YES NO
Stage 1
BY:
Helen Maria
Date: 151
II! 11111111111 11111
111111111111111111I
I 1
Date: 151
Quality Checked 1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Helen Maria
Comments about this file:
•
bp
BP Exploration (Alaska) Inc.
Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 30, 2011 1`' J F E B 2 4 ZU1c
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue
Anchorage, Alaska 99501 ,fin P6- c3 Subject: Corrosion Inhibitor Treatments of MPS -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely, •
Mehreen Vazir
BPXA, Well Integrity Coordinator
410 41,
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
MPS -Pad
10/11/2011
Corrosion
• Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011
MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011
MPS-03 2021460 50029231050000 Open Flutes - Treated
MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-05 2021370 50029231000000 Open Flutes - Treated
MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009
MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011
-----> MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009
MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011
MPS-11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011
MPS -12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011
MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009
MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011
MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011
MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 7/29/2011
MPS -17 2021730 50029231150000 Open Flutes - Treated
MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011
MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009
MPS -22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011
MPS-23 2021320 50029230980000 Open Flutes - Treated
MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011
MPS -25 2021030 50029230890000 Open Flutes - Treated
MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011
MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011
MPS -28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011
MPS -29 2021950 50029231190000 Open Flutes - Treated
MPS-30 2022360 50029231310000 1.2 NA 12 NA 11.9 7/28/2011
MPS -31 2020140 50029230660000 Open Flutes - Treated
MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011
MPS-33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011
MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011
MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 , 7/28/2011
MPS-37 2070520 50029233550000 13.9 Need top job NA
MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011
MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA
MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011
MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011
MPSB -04 _ 500299990799 0.6 NA _ 0.6 NA 3.4 7/30/2011
~
•
~ ~ '... atr'~ t'...-~, ~.v i.; ~ -1 ~ ~ ~ ~ y ~ _°~ ~ -.~~ ~a ~ g- =;
~~p~ ~ ~ ~ ~ ~~ ~ ~ ~ ~j~~~ ~ ~ ~" ~ ~ ~~'v ~ ~ ~ ~~ r ~ SEAN PARNELL, GOVERNOR
~g~~A~g~cp~~.~ e~~~~~~~~^j~
P~~~~ ~_~ ~ J ~ W.~J~' ~,~ ~a~~.,f/ ~ ~ i~ .,=..Y ~ ~:~ Ir~ ~ ~_. ~
~-7~ ~I~ ~D Vu~-.7 ~ 333 W. 7th AVENUE, SUITE 100
CO1~T5ERQATIOrIT COMI~IISSIOI~T ~ pHONORA(9 ;A2?9KA339501-3539
~ FAX (907)276-7542
October 20, 2009
Mr. Harry Engel
Engineering Team Leader
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, AL 99519-6612
~~~~~~ ;;~r~ ~r ~. ~ 2D~9
Re: Milne Point Unit, Schrader Bluff Oil Pool,
MPS-02, MPS-0 MPS- l0A and MPS-26
203-127 202-020 205-125 and 203-061
BP Exploration (A aska) Inc.
Dear Mr. Engel:
Enclosed are the work descriptions for subsurface well treatments in the listed
wells that were erroneously submitted containing information and operational
details proprietary to BP. These work descriptions have been replaced with the
edited documents you supplied.
Sincerely,
.~
Thomas E. Maunder, PE
Sr. Petroleum Engineer
Enclosures (4)
-~- ° ~
+1 o c-~ P°ce s~ c~.~ ~.
~~J-F~~
STATE OF ALASKA
ALASK~L AND GAS CONSERVATION COMMIS~N
REPORT OF,S,~NDRY WELL OPERATIONS
~ ~"' . ~ n.~ ~,". ~ ~~~ ~ ~, ~
F ~^~ y g 1('~~kCl.
~ t_ ~. ~~ .¢. ~ ,<c.~..
~.
1. Operations Abandon ~ Repair Well ~,y Plug Perforations ~ Stimulate ~ ° ~ q~R
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension ~ -
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well ~
2. Operator BP Expforation (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
tvame: De~elopment ~ Exploratory ~! 202-0200 .
3. Address: P.O. Box 196612 Stratigraphic ~ S~~"~C@ ~ 6. API Number: ~ ~
Anchorage, AK 99519-6612
50-029-23067 ~6!00 ~(j
7. KB Elevation (ft): 9. Well Name and Number:
73.2 KB MPS-09LS .
8. Property Designation: 10. Fieid/Pool(s):
ADLO-380110 Q~ ~p(~l Milne Point Field/ Schrader Bluff Pool
11. Present Well Condition Summary:
Total Depth measured 8923 feet Plugs (measured) None
true vertical 4583.59 feet Junk (measured) None
Effective Depth measured 8828 feet _
true vertical 4516.13 feet
Casing Length Size MD ND Burst Collapse
Conductor 112 20" 92# H-40 34 - 112 SURFACE - 112 1530 520
Surface 8914 7"26# L-80 34 - 8914 34 - 4577 7240 5410
,,~~~ ~~ ~
~~l~„,~
c>;; 't _.°Si:,~ . ~
Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _
True Verticai depth: _ _ _ _ _
Tubing: (size, grade, and measured depth) 2-3/8" 4.6# SHORT L-80 8526' - 8541'
2-3/8" 4.7# LONG L-80 8915' - 863~
~~
~~` S~~C~
Packers and SSSV (type and measured depth) 7"x2-3/8" BAKER "GT" RET DUAL PKR 8526' rJ
7"x2-3/8" BAKER "FH" RE7 PKR 8615' ~ c.~ f paC~~ r'
0 0 ~ ~~~ • ` _ •
J' ~
0 0 ~~ 9~`~
12. Stimulation or cement squeeze summary:
Interoals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation:
Subsequent to operation:
14. Attachments: 15. Well Class after qroposed work:
Copies of Logs and Surveys Run Exploratory I~ De~elopment ~ Service ~
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil ~ Gas ~ WAG ~ GINJ ~ WINJ ~ WDSPL ~
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: ~
309-~ ~ ~
Contact Paige Sloan
Printed Name Paige Sloan Title Production Engineer
Signature Phone 564-4278 Date 9/1/2009
Form 10-404 Revised 04/2006 ~ Submit Original Only
• ,•, r -,
"~` ~~ .t~r,. :~ ~ 2~0~ a- ,~r ~/~j
~::~
M PS-09
202-020
PFRF OTTO(_HMFNT
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
MPS-09 6/15/03 PER 8,554. 8,594. 4,327.92 4,354.31
MPS-09 6/15/03 PER 8,654. 8,684. 4,394.96 4,415.61
MPS-09LS 6/15/03 PER 8,654. 8,684. 4,394.96 4,415.61
MPS-09SS 6/15/03 PER 8,554. 8,594. 4,327.92 4,354.31
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
~
e ~ ~ •
MPS-09LS
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIOS
EVENT SUMMARY
ACTIVITY DATE SUMMARY
04/Aug/2009 Gel Treatment. Unable to pump on well. LR RU and pump acid
stimulation.
07/Aug/2009 Gel Treatment. RU and pump injectivity test. Pump gel with cross
link treatment. Cont' on 8/8/09 WSR.
08/Aug/2009 Gel Treatment. Cont' from 8/7/09 WSR. Finish pumping gel stage
and freeze protect well with methanol. Standby for results of gel
testing. Pump injectivity test with produced water. Send pump
results to town and wait on plan forward. RD pumping equipment.
Cont' on 8/9/09 WSR.
09/Aug/2009 Gel Treatment. Cont' from 8/8/09 WSR. RD complete. Notify
operator of well status. ***Job Complete**
FLUIDS PUMPED
BBLS
23.7 Methanol
51 Gel
10 15% HCI
234.5 Produced Water
•
~ F.. >. I'. P ," Y~ R~ ~
_ ,~ ~ ut~ & ~ ,. ~
\r~ '~ E" ~r i 4' aJ~ ~~ ~~1 c' t f~s t A:~"t. s~ i S~~ ~C !'~
~_ z..- ~"'~` 'f.d b. ~ne ~~ ~.~~~F.~= ~t"~ ~ . ~..~: ~.F ~~~;.
~-7~ Q~J L~l~l1 tiA~7
C01~5ERQATIOI~T COrII~IIS51OrT
Paige Smith
Production Engi.neer
BP E~loration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612 ~t~-~-~~~'~ `~~~'
•
SARAH PALIN, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE,ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
" '~ ~~~~
~:~
Re: Milne Point Field, Schrader Bluff Pool, MPS-09
Sundry Number: 309-213 ~b~,_ o~~
Dear Ms. Smith:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, withiri 20 days after written notice of this
decision, or such further time as the Corrunission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
~L Chair
~~
DATED this ~ day of July 2009
Encl.
• ~,,,Q~ STATE OF ALASKA
~p~ ,~~\~v ~ ALAS~OILAND GAS CONSERVATION COMMI~N
~~/~~ APPLICATION FOR SUNDRY APPROVALS
"~l 20 AAC 25.280
~~~~~~~~
~j~~ JUN 2 3 2QQ9
~
~laska Oil & Ga~ Cons. ~ommiss's~n,,
1. Type of Request: Abandon ^ Suspend ^ Operational shutdown ^ Perforate ^ Waive~~!~i~~~ Other
Alter casing ^ Repair well Q ~ Plug Perforations ^ Stimulate ^ Time Extension ^ POLYMER JOB •
Change approved program ^ Pull Tubing ~ Perforate New Pool ^ Re-enter Suspended Well ^' M
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
BP Exploration (Alaska), Inc. Development ~ Exploratory ~ 202-0200 ~
3. Address: P.O. Box 196612 Stratigraphic ~ Service ~ 6. API Number:
Anchorage,AK 99519-6612 50-029-23067-00-00
7. !f perForating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
properry line where ownership or landownership changes:
Spacing Exception Required? Yes ^ No ^ MPS-09 •
9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s):
ADLO-380110 ` 73.2 KB - MILNE POINT Fieid / SCHRADER BLUFF Pool .
12• PRESENT WELL CONDITtON SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured):
8923 ' 4583.59 , 8828 4516.13 NONE NONE
Casing Length Size MD ND Burst Collapse
Structural
Conductor 112' 20" 92# H-40 34 112 34 112 1530 520
Surface 8914' 7" 26# L-80 34 8914 34 4577
Intermediate
Production
Liner
Perforation Depth MD ft):
~~ Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
'~`~ '~ ~~ 2-3/8" 4.6# SHORT L-80 8541' 8526'
- - 2-3/8" 4.7" LONG L-80 8637' 8615'
Packers and SSSV Type: Packers and SSSV MD (ft}:
7"X2-3/8" BAKER GT RET DUAL PKR 8526'
7"X2-3/8" BAKER GT RET DUAL PKR 8615'
13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work:
Detaiied Operations Program ~ BOP Sketch ^ Exploratory ^ Development ^ Service ~'
15. Estimated Date for 16. Well Status after proposed work:
Commencing Operations: 7/7/2009 Oil ~ Gas ~ Plugged ^ Abandoned ~
17. Verbal Approval: Date: WAG ~ GINJ ^ WINJ Q~ WDSPL ~
Commission Representative:
Prepared by Gary Preble 564-4944
1 S. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact pAIGE SMI7H
Printed Name p E SMITH Title PRODUCTION ENGINEER
Signature . Phone Date
564-4728 6/23/2009
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ~Z ~ 3
Plug Integrity ^ BOP Test ~ Mechanical Integrity Test ^ Location Clearance ~ ~~~~~~~~
Other:
J(~N 2 3 20Q9
~I,~ska ~iI ~'~ !~~~ ~~~~,
~, C~~FIn'11S P,_.
Subsequent Form Required: ~~ ~ Gh~ ~v'ipgc~G ~~- p~y~ ~~ j'~ ~~~~~LC~ ~.Qe~.~ ~~~ 5~0~~~
, `V~~ `
APPROVED BY
/
~
~ / ~
Approved by: COMMISSIONER THE COMMISSIO Date: (
~~
Form 10-403 Revised O6/2006 ~~~ j~~ ''~~~` Submit in Duplicat ~~~~
~ v ~ ~,
M PS-09
202-020
PFRF OTTOC:HMF_NT
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
MPS-09 6/15/03 PER 8,554. 8,594. 4,327.92 4,354.31
MPS-09 6/15/03 PER 8,654. 8,684. 4,394.96 4,415.61
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO ~ILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
n
~J
r 1
~
Tree: crw 2 v~e- sr~ ouai str:~
4Mehead:ll' x 2 31~ 51N FMC dual slring M PS-09 i
HangQr Ihread 2 3t8' EUE top ard IBT 60l
2' GW-H BPV proTie
20" x 34' i~d, 215 ~A"(t A-53 112'
I Shart Strina
2985' 2~1'6" HES X-PVQpIQ (1.875 pkkp.. 6ore)
KOP ~ 38d'
80t depree ban 3285' to 83@5
Mex. hole angle = 78 deg ~ 4050-4425'
Hoie an81e hu perf = 49 dep
T 26AF. L~0.19T MOD Casiip
(drift id = 8.151, ceP = .0~3 bpf~
2-3f8'. 4.7 #At L-80. IBT tubing
(driR id = 7.907, cep-=-00387 6pf)
' ~ 2-3f8' HES X-t~ppl4 (1.875' pkg. bore)
8535' 2-3f8' HES XN-P6pple (1.875' pkg. bon
No-Go 1791"
8541' Tubi~e fail I WLEG
Pertoration Summary
Size Spf Ir~berval (TVD)
4 51B'
4 5!8'
5
5 na ~v.,~
8554' - 85~4'
OB sands
8854' - 8884'
4328' - 4356'
4395' - 4419'
Orig. KB Elev. = 73_20
Otig. GL Elev. = 29.20
~: r~6e.a~a~
aun~d hanpv
2-3J8' HES Xa+lipQle (1_87S pkg_ bore) 299T '
2-3l8" HES X-Nipple (1_875' pkg_ bore} ~
r snon .ir_ s4~~ - s~oea•
r x 2-3ra- sawe- -~r R~. a~ qQ_ s5ze•
~_eas ro.
T z 2-318' Baber'FH' Ret pkr. 8815'
2_4~' ID.
2-3fB' HES JSN-~kppie (7.875' Pk6• bmel 8627'
No-Go 1.781'
2-3J8' Baker'E' Flydio Trip Sub 8837'
yd b' m~we P~P l~ ~P~~ ~
(7.62" pkg bare)
Hydro Tnp Sub ELMD ~~"
~ ~.~5 ~n.
8828' T H~libkrbn Float CoNar PBTD
8913' 7' Hai6urton Iloet shoe ~
DATE REV_BY COMMENTS
er~~roa tee Hui~ wen ~ea ar~d ~,p~a by ooy«, ~a MILNE POINT UNIT
YYELL No.' S-09i
ARI : 50-029-23067-00
BP EXPLORATION (AK)
• •
Maund~er, Thomas E (pQA)
From: Engel, Harry R [Narry.Engel@bp.comJ
Sent: Wednesday, August 12, 2009 7:49 AM
To: Maunder, Thomas E (DOA)
Subject: Revised Procedures for AOGCC re: MPU gel treatments
Attachments: MPS-02 Ge! 7reatment.doc; MPS-09LS Gel Treatment.doc; MPS-10LS Gel Treatment.doc;
MPS-26SS Gel Treatment.doc
~o~-oa ~
~~ ~~ ;~:` `~~
MPS-Q2 Gel MPS-04L5 Gel MPS-10LS Ge! MPS-26SS Gel
reatment.doc (110 .freatment.doc (ii..~reatment.doc (10..freatment.doc (85..
Good morning Tom-
Enclosed are the procedures I propose for the Milne Pt. Sundries.
Please review and let me know if these meet your needs. If so, I recommend we substitute
these for what was previously submitted.
Thanks for your assistance in this matter.
Harry Engel
Engineering Team Leader
Alaska Drilling & Wells
~~~~~~~:~ ~~~`tf '~ ~ Z00~
~
To: Mark O'Malley/Jerry Sharp Date: June 22, 2009
MPU Well Operations Supervisor
From: Paige Smith, MPU Schrader-S Pad Engineer
Subject: MPS-09 LS Gel Job ~~ ~_~ ~~
Step Unit Operation
1 O Shut in all offset producers and offset injector. Bullhead 10 bbl gel into MPS-
09LS.
2 O Bullhead ~500 bbl gel down MPS-09LS. Keep well and offset producers and
injectors shut in for minimum of 7 days and flow producers to a tank before
returnin to production.
OBJECTIVE
1. Divert water from its preferential path.
Measure of success
1. Gel treatments are fully displaced into formation.
2. Post injection is adequate to achieve injection rate target at below target pressure.
CRITICAL ISSUES
• Ensure pumping pressure is not above the fracture gradient (~1000 psi for MPS-09LS).
• Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of
remnant gel per guidance from the Environmental Team.
PROCEDURE
Stage1. Injection Test
1. RU, hold pre-job safety meeting, PT surface lines
2. Ensure offset injectors and producers are SI
3. Spear in with 1-2 barrels of Methanol, pump 70 bbls produced water preflush, 10 bbls gel and
70 bbls produced water over flush. Pump at 1 bpm with a max pressure 1500 psi (frac
pressure + estimated friction). Attempt to hold injection rate constant while adjusting pressure
as needed.
4. Contact Engineering to discuss the injection pressure/rate trends. Once consensus is
achieved that the fluid can be successfully placed into formation at acceptable rate/pressure
continue with remainder of program.
~ •
Stage 2. High Volume Gel Treatment
5. Ensure offset injectors and producers are offline
6. Pump 35 bbls produced water preflush, ~500 bbl gel and 60 bbls produced water over flush
followed by 10 bbls freeze protect. Pump at 1 bpm or a max pressure 1500 psi WHIP (frac
pressure + estimated friction). However, injection pressure limits may be exceeded as
necessary to avoid trashing the wellbore by leaving gel in the tubing or liner.
7. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole
conditions) to monitor actual setting time.
8. Rig down all equipment and hold post-job assessment meeting to capture learnings to be
incorporated into future jobs.
9. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and
rate data from job to Pad Engineer.
~
~
Tf~e: ~~yM 2 1I18" 5M Duel strimg
"
" Q
~ P S
O
x 2 3l8
56t FMC dual string
Welhe6d:11 ~ ~/ ~
Hanger thread 2 3J8° EUE Uop and 16T bot6o
2' GIW-H BPV profil~
2fl" x 34" irasuta~ed, 215 #rft A-53 f 12'
Short Strina
2gg5' 2-3J8' HES X-Ni~te (1.875' pkg. bore} ;.
KOP ~ 380'
80+ degree frortt 3285' to 8365'
Ntax. twle ar~e = 78 dee ~ 4ip50-4425
Haie ar~e thru perfs = 49 deg
7" 201F. L-80. IBT MOD Casng
(driR id = 8.151, cep.= .D383 bpfl
2-318", 4.7 #1R L-S0, 16T tubing
(drift id = 1.901, cap.=.U0387 bpf)
~ 2-3/8" HES X~lipple (t.875' pkp. bore)
8535' 2-318' HES XN-Nipple (1.875' pkg. bor
No-Go 1.791'
8541' Tub~g tail f WLEG
Pertoration 5ummary
Siae SRf Interval (TVD)
4 5J8"
4 5JB'
5
5 ne ~n~,~
8554' - 8594'
D6 sands
8654' - 8884'
4328' - 4355'
4395' - 4419'
Qrig_ KB Elev. = 73.2d
Orig. GL Elev. = 29.~0
Ncte- 7" casing is landed aa
mam~el fwng~.
2-3/S HES X-Nipple (1_875' pkg. bore) 2~97'
2-318' HES X-Nippie ( 7.875' pk8. hore) ~
r snort .h ~a~e~ - eaee~
7' x 2-3J8' Beker'~GT' Ret dual pkr_ 8526'
1.645 ID.
Y x 2-3/8' Beker'FH' Ret piv. 8615'
2.49" ID.
2-318' HES XN~/ippk (1.875' pka. borey &927'
No-Go 1.791'
2-3i8' Baker "E' Hydro Trip Sub gg37'
w18° muleshce pup (bdfom depth) ~
~~.sr q~9. no~ey
Hydro Trip Sub ELMf} sest'
~ t.7s beit.
$~' ' 7' Hellburlon Floet Coilar PBTD ~~ ~
~~„r-z, y~~y4 r~!
89'13' 7" Ha~iburhon float shoe , '
Df1TE RE'J. BY COMMENTS
e~+17ro~ ~e~e Hnlme Well MILNE POINT UNIT
s4ueezed and compleEed by Doyon 14 y~LL No.' 5-091
API : 50-029-23067-0D
BP EXPLORATION (AK)
.
MEMORANDUM
State of Alaska
.
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
Kø[~{ 4/26/ü7
DATE: Monday, April 23, 2007
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
S-09
MILNE PT UNIT SB S-09
JjJ 1-"" 0 '}-O
FROM:
Chuck Scheve
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Suprv .::::n:te
Comm
NON-CONFIDENTIAL
Well Name: MILNE PT UNIT SB S-09 API Well Number: 50-029-23067-00-00 Inspector Name: Chuck Scheve
Insp N urn: mitCS0704 1508 I 225 Permit Number: 202-020-0 Inspection Date: 4/14/2007
Rei Insp N urn:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well S-09 Type Inj. w ITVD 4368 IA 280 I 1710 I 1670 1670
P.T.D 2020200 TypeTest SPT I Test psi 1~()0 OA i I
Interval OTHER P/F P v Tubing 800 -r 800 I 800 800
Notes: Test performed due to leaks encountered on other monobore completions.
sCANNED APR 3 0 2007
Monday, April 23, 2007
Page I of I
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us;Tom_Maunder@admin.state.ak.us
OPERATOR:
FIELD / UNIT / PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP
ACT / Milne Point / S-Pad
04/14/07
Jeff Rea / Lee Hulme
Chuck Scheve
arJav-IJ;}..O
Packer Depth Pretest Initial 15 Min. 30 Min.
WeIlIMPS-07 I Type Ini. N TVD I 4,231' Tubing 400 500 500 500 Interval 0
P.T.D.12020720 I Type test P T est psi! 1500 Casing 1,700 1,650 1,640 PtFI P
Notes: 4.4 bbls diesel to 1700 psi. Bled to 0 psi OA
Well is currently SI. Proactive testing to determine IA status due to leaks found on other monobore completions.
WeIlIMPS-09 I Type Ini. W TVD I 4,368' Tubing 800 800 800 800 Intervall 0
P.T.D.12020200 I Type test P Test psil 1500 Casing 280 1,710 1,670 1,670 PtFI P
Notes: 1.6 bbls diesel to 1710 psi. Bled to 300 psi OA
Proactive testing to determine IA status due to leaks found on other monobore completions.
WeIlIMPS-13 I Type Inj. N TVD I 4,166' Tubing 1,220 1,220 1,220 1,220 Interval I 0
P.T.D.12021140 I Type test P Test psil 1500 Casing 1,800 1,720 1,720 PtFI P
Notes: 3.4 bbls diesel to 1800 psi. Bled to 250 psi OA
Well is currently SI. Proactive testing to determine IA status due to leaks found on other monobore completions.
WeIlIMPS-21 I Type Ini. N TVD I 4,027' Tubing 200 250 250 250 Intervall 0
P.T.D.12020090 I Type test P T est psi! 1500 Casing 220 1,720 1,680 1,680 PtFI P
Notes: 1.7 bbls diesel to 1720 psi. Bled to 200 psi OA
Well is currently SI. Proactive testing to determine IA status due to leaks found on other monobore completions.
Weill I Type Inj. TVD I Tubing Interval!
P.T.D.I I Type test T est psi! Casing PtF
Notes: OA
.
.
TYPE INJ Codes
D = Drilling Waste
G = Gas
I = Industrial Wastewater
N = Not Injecting
W = Water
TYPE TEST Codes
M = Annulus Monitoring &CANNED APR 1 '1 2007
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
0= other (describe in notes)
MIT Report Form
BFL 9/1/05
.. ,,"4 .....,a..!L_,~.!~,~~ ,'~ '
MIT MPU S-07, S-09, S-13, S-21 4-14-07.xls
.
.
..
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFicbe\CvrPgs _ Inserts\Mîcrofilm _ Marker.doc
) 7 Jt1l ~ ~_A ~ ~--
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2005
51'(,~ ~ I ~?;,L fJ~'\-
API No. 50-029-23067-00-00
Permit to Drill 2020200
Well Name/No. MILNE PT UNIT SB 5-09
Operator BP EXPLORATION (ALASKA) INC
MD 8923,......-
TVD 4584 /'
~
Completion Date 6/17/2003
~-~~Y
)
Completion Status 1WINJ
Current Status 1WINJ
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
--- ----~-
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, CCL, USIT
Well Log Information:
Log/
Data Digital
Type Med/Frmt
c/>cõg
Log
'Log
~ C
: Efr' C
RPt
ftÐ'/ D
(data taken from Logs Portion of Master Well Data Maint)
Electr
Dataset Log Log Run Interval OH/ ~
Number Name Scale Media No Start Stop CH Received Comments
Temperature 5 Col 1 7700 8809 Case 6/4/2002
Pressure 5 Col 7700 8809 Case 6/4/2002
Cement Evaluation 5 Col 7700 8809 Case 6/4/2002
10912 Cement Evaluation 7706 8794 Case 6/4/2002
11402 See Notes 113 8923 ~ 12/13/2002 Digital Well Logging Data 1
Rate of Penetration, Dual
Gamma Ray,
Electromagnetic Wave
Resistivity
LIS Verification
10947 L1S-Ve,ifil.Mion G ~~ ~ UJ yt '-l Ad yð
75 8886 Open 7/2/2002
75 8886 Open 7/212002
Sample
Set
Sent Received Number Comments ~ "-'
Well Cores/Samples Information:
Name
Interval
Start Stop
ADDITIONAL INFORMATION
Well Cored? Y ®
Daily History Received?
<iÌ/N
@/N
Formation Tops
Chips Received? ..¥-J..N--
Analysis
Received?
--
Comments:
~
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2005
Permit to Drill 2020200
Well Name/No. MILNE PT UNIT SB 5-09
Operator BP EXPLORATION (ALASKA) INC
MD 8923
TVD 4584
Completion Date 6/17/2003
Completion Status 1WINJ
Current Status 1WINJ
~~-~-
J-o
Date:
Compliance Reviewed By:
API No. 50-029-23067-00-00
UIC Y
i !J-f~r
"-'
\.
-\ STATE OF ALASKA
ALASK. JIL AND GAS CONSERVATION CO\¡, 1SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: 0 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3346' NSL, 49' WEL, SEC. 12, T12N, R10E, UM
Top of Productive Horizon:
4642' NSL, 4286' WEL, SEC. 08, T12N, R11 E, UM
Total Depth:
4750' NSL, 4041' WEL, SEC. 08, T12N, R11E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x-__.565961 y-...~00q2_!~.__ Zone- ASP4
TPI: x- 571768 y- 6001365 Zone- ASP4
Total Depth: x- 572011 y- 6001475 Zone- ASP4
18. Directional Survey 0 Yes 181 No
21. Logs Run:
MWD , GR , RES, CCL , USIT
22,
,····'CÄSING'·
Size:
20"
7"
Other
5. Date Comp., Susp., or Aband.
6/17/2003
6. Date Spudded
02/21/2002
7. Date 1. D. Reached
2/25/2002
8. Elevation in feet (indicate KB, DF, etc.)
KBE = 73.2'
9. Plug Back Depth (MD+TVD)
8828 + 4516 Ft
10. Total Depth (MD+TVD)
8923 + 4584 Ft
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
NIA MSL
Revision 09/23/03 Start Injection
1 b. Well Class:
o Development 0 Exploratory
o Stratigraphic 181 Service
12. Permit Number
202-020 303-154
13. API Number
50- 029-23067-00-00
14. Well Number
MPS-09i
15. Field and Pool
Milne Point Unit I Schrader Bluff
16. Lease Designation and Serial No.
ADL 380110
17. Land Use Permit:
20. Thickness of Permafrost
1800' (Approx.)
I I I ¡ :: ¡!" I, I I' , I I ' ; ,. ¡, I I , ¡ : : , ',,:':":: ," : i ;':' , 'I.': ': ' " ,:'" ~,I '; :, ; i ~ ' i :' I, I :, ,~,':: I
"I Wl.!?ERFr. '1··'·GRÄoç.
92# H-40
26# L-80
CASING, LINER AND CEMENTING RECORD
iSET~II4G~:DEA¡tHI'I;'"li: , HdCE' ; ',liII
. ·i', Top "I, ,',. .' ,1,BOTTal\ll',:~I?E . :
34' 112' 42" 260 sx Arctic Set (Approx.)
34' 8914' 9-7/8" 1461 sx Class 'L', 400 sx Class 'G'
I ,>" ',. '.,":":' ;1,>1.,/ I:~
'.' AMOUNT. P~'L:lED,:'
23. Perforations 0Ren to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-5/8" Gun Diameter, 5 spf
MD TVD MD TVD
OA Sands OA Sands
8554' - 8594' 4328' - 4354'
08 Sands 08 Sands
8654' - 8684' 4395' - 4416'
26.
Date First Production:
I 'I.¡':' "t'U6'"NG\',ReG"tiR:6';" I
SIZE DEPTH SET (MD)
2-3/8", 4.6#, L-80 (Short) 8541'
2-3/8",4.7#, L-80 (Long) 8637'
25. ·.;:,,L\Ç'I~:F:~6TlJRE;,ÇEM!=~T'$94EEZE,ETC;
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 58 Bbls of Diesel.
2-4:.·;
August 1, 2003
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Water Injection
Oll-Bsl GAs-McF
PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED + Oll-Bsl
Press. 24-HoUR RATE
W A TER-BSl
GAs-McF
WATER-Bsl
PACKER SET (MD)
8526'
8615'
CHOKE SIZE
GAS-Oil RATIO
Oil GRAVITY-API (CORR)
27. CORE DATA,. .... ." ...,.
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or 'w~ter{åttach ~paiateJsheet, if necessary).
Submit core chips; if none, state "none".
None
o RIG I N At"
SEP 2 4 2003
Form 10-407 Revised 2/2003
,/
CONTINUED ON REVERSE SIDE \.9 V RBDMS BfL.
SEP ~ 9 A~H:i
.
.
-.
28.
.,~
NAME
MD
TVD
29. rORMATION TESTS
Include and brielly ;:;Ùmmarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
GEOLOGIC MARKEr )
SF2_NA
SBF1_NB
SBE4_NC
SBE2_NE
SBE1_NF
TSBD_OA
TSBC
8242'
4164'
None
8306'
4192'
8371'
4223'
8402'
4239'
8498'
4293'
8552'
4327'
8603'
4360'
TSBB _ OB
SBA5
8653'
4394'
8693'
4422'
'j"\Q:'O 2 4
\\)~_.t~ .:0,/ .
30. List of Attachments:
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Son~ Title Techniæl Assistant Date Cf1- Z 3- 03
MPS-09i 202-020 303-154 Prepared By Name/Number: Sondra Stewman, 564-4750
Well Number A Drilling Engineer: Matt Green, 564-5581
Permit No. I pproval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), 50 state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 2/2003
12/17/2003 12:22 PM
10f3
Bill
The rate changes on the SS were a result of choke adjustments by the
operator to meet injection rate targets. The decreasing rate "chatter"
seen
on the LS around the same time is not abnormal for the Schrader OB
injectors. The OB tends to start out with comparable injectivity, then
degrade over time. We've seen similar responses on the other dual
completions.
Tom,
Just got back from vacation and read your note.
"Mathews, William L" wrote:
Welcome back. Thanks for the reply.
Tom
-----Original Message-----
From: Tom Ma un de r [~0.:..~...~..!;.?..:...!::..?..~.~_~!..~.?.:.~.~.ª.~..!.:":.~~?..~..ª~.~..~..~...:....?...~..~~..!::..~...:...~}~...:...~~.~.]
Sent: Wednesday, August 20, 2003 2:58 PM
To: Mathews, William L
Subject: Re: MPS-09i Logging Requirement
Thanks,
Bill
Tom,
Please let me know if we have approval to continue injection without
performing any additional logging to determine zonal isolation -as per
my
original request.
"Matthew's, William L" wrote:
you have developed satisfactorily
No further logging is needed.
Bill,
Sorry about that, yes the information
demonstrates the necessary isolation.
Tom Maunder, PE
AOGCC
-----Original Message-----
From: Tom Ma unde r [!~.?:..~..~..!:..?...:....~..9..~_~.~..~.~.g.~..~.~.~.¢.!:~.~.~..!..~...~....~..!;.0.:.!:..~....:...~.~...:...~..?.]
Sent: Wednesday, August 20, 2003 3:24 PM
To: Mathews, William L
Subject: Re: MPS-09i Logging Requirement
Thanks Tom.
~~~J~Si:......·~.;..·..~P.~.70~..i..·..~p.~.~.ì~.g....~~9~i.7~~¢nt......... ...
~·.~..~\m¡::.·_'·'~~~~~~s.;.iYVi~li~.p}·...·F"..·.:~~~tRG!~~L.K$~~·;è¡(#n*·.· .
iIJ)..a,~e:.~~q,+QAµg .20.ø:3·19:p~:·14-¡7.()Sºø· >. .
. .. . .. ..... ·~mæ~~!:j~~r ........ ........ . .. . . ..... . .... ..
)
')
RE:MPS-09i Logging Requirement
12/17/2003 12:22 PM
20f3
and
OB sands. The job went as planned, placing an additional 17 bbls of
cement
behind pipe through perforations at 8594'-85961 MD. The well was
OA
As you might recall, this well is completed as a dual string
injector
(schematic attached). The April 26, 2002 cement bond log (SCMT)
showed
poor
cement between the OA and OB injection intervals, but fair cement
above
the
OA providing isolation from the overlying N sands. Due to the
planned
completion type, a cement squeeze was performed to better isolate
the
confirm isolation." I have some question with regard to what
surveillance
will be acceptible by the AOGCC.
run
to
On the Sundry Approval for Milne well MPS-09, there was a hand
written
notation that reads "by July 31, a temperature or other log must be
Tom,
"Mathews', William L" wrote:
Bill,
The information you have available does seem to indicate that each
string
is
acting
independently. It appears that there was a stabilization period (not
uncommon) and
then a few week period of this independent operating time. I am
curious
about the
pressure and rate changes at the end of the plot O.bmp. It appears
that
the
pressure
has been changed on the SS and the rate has come up as one would
expect.
The pressure
on the LS looks to taper off a little, but the rate really "chatters".
Look forward to your reply.
Tom
-----Original Message-----
From: Tom Ma un de r [~,~..~:..~..~..9....:...~..?~_~~,9.:.~.:Q.~.~..!..~~~.9.:.~~.~.~...~....§...~:.?:..~.§.:...:...?:..~...:,..~.~..~.]
Sent: Friday, July 25, 2003 3:37 PM
To: Mathews, William L
Subject: Re: MPS-09i Logging Requirement
)
RE: MPS-09i Logging Requirement
12/17/2003 12:22 PM
30f3
Name: olel.bmp
olel.bmp Type: Bitmap Image (image/bmp)
Encoding: base64
Name: oleO.bmp
oleO.bmp Type: Bitmap Image (image/bmp)
Encoding: base64
Name: MPS-09 Schematic.ZIP
MPS-09 Schematic.ZIP Type: Zip Compressed Data
(application/x-zip-compressed)
Encoding: base64
------------------------------------------------------------------------
«MPS-09 Schematic. ZIP»
Bill Mathews
Schrader Bluff PE
BP Exploration, Alaska
564-5476
440-8496 cell
Please let me know if this will meet your approval.
date. Should day to day injection surveillance indicate a problem,
we
can
do
diagnostic work from surface by monitoring wellhead pressures while
selectively injecting down each string.
to
I would like to defer any logs on this well based on its performance
Injection down both strings commenced on June 26. As you can see
from
the
plots below, each string appears to act independently with regard to
rates
and pressures.
then
perforated and completed.
)
)
RE: MPS-09i Logging Requirement
Tree: CIW 2 1/16" 5M Dual strin~ )
Wellhead:11" x 2 3/8" 5M FMC dualstring M PS-09i
Hanger thread 2 3/8" EUE top and IBT bottom
2" CIW-H BPV profile
-)orig. KB Elev. = 73.20
Orig. GL Elev. = 29.20
20" x 34" insulated, 215 #/ft A-53 ŒÐ '
..:..,...,....,.,...:....'..:..':...:."':'.:'::.:"'.:: ::::. ,'.
....:........'.... .... .................. . ....,. .......,...:...,.....
:·.~~~~·~~í'~;~~~,,·.~:·'(J~~~~···8~....·..
, ong Strin~
Short String
I 2995' I 2-3/8" HES X-Nipple (1.875" pkg. bore) 1:1I
DJ 2-3/8" HES X-Nipple (1.875" pkg. bore) I 2997' I
KOP @ 380'
60+ degree from 3285' to 8365'
Max. hole angle = 78 deg @ 4050-4425'
Hole angle thru perfs = 49 deg
7" 26#, L-80, IBT MOD Casing
(drift id = 6.151, cap.= .0383 bpf)
2-3/8",4.7 #/ft L-80, IBT tubing
(drift id = 1.901, cap.=.00387 bpf)
I 8484 I 2-3/8" HES X-Nipple (1.875" pkg. bore)
. . III 2-3/8" HES X-Nipple (1.875" pkg. bore) I 8484' I
r . X 7" Short Jt. 8479' - 8498'
l~ef~1 ~:~~~,~~~" Baker "GT" Ret. dual pkr. I 8526' I
8535' I 2-3/8" HES XN-Nipple (1.875" pkg. bore)
No-Go 1.791"
8541' I Tubing tail I WLEG
Iml
'"
Perforation Summary
7" x 2-3/8" Baker "FH" Ret. pkr.
2.41" 10.
I 8615' I
Size Spf Interval (TVD)
OA sand~ 2-3/8" HES XN-Nipple (1.875" pkg. bore) I 8627' I
No-Go 1.791"
45/8" 5 8554' - 8594' 4328' - 4355'
OB sands 2-3/8" Baker 'E' Hydro Trip Sub
45/8" 5 8654' - 8684' 4395' - 4416' wI 6' muleshoe pup (bottom depth) I 8637' I
(1.92" pkg. bore)
E E Hydro Trip Sub ELMD I 8631' I
I 8828'
I 8913'
7" Halliburton Float Collar PBTD
7" Halliburton float shoe
ø
Å¡1T":;í~~;i:'
1.75" ball.
DATE
6/17/03
REV. BY
COMMENTS
Well squeezed and completed by Doyon 14
MILNE POINT UNIT
WELL No.: S-09i
API : 50-029-23067-00
Lee Hulme
BP EXPLORATION (AK)
oleO.bmp (BMP Image, 642x444 pixels) )
)
MPS-09 Injection
- 8-09 88 WHIP
- 8-09 88 Rate
- 8-09 L8 WHIP
-- 8-09 L8 Rate
3000 -...".--.-.-..--
k\
j 1
~~\1'
SS = short string (OA interval)
LS = long string (OB interval)
2500
2000
--
~
~ 1500 ..,.Jl-. -...,""~ -~Áv-\J, 1'- 6 .~
:I: \ .. VfJ V ,r 1 ~I I t ì0..~,\~·Ft~~y¿.·~tm~' lll~~~'11 "-."",?",,",=
~ l~r~f.1j~'1~~~~~ ~ "~. l j ~,"yÅt"ìí'''r'N)í¥-'------~ .L.¡.uþtllL
'~I/,~~\\ (I II r \ . ,I, jf\ '\J~,II I I r
1 000 -""Ji~I~ -Ii - r' . .I~ \ - ,hlr-1V~ lll,'\
I r ~,~
500 ' ~
\~t ~
010
6126 6128 6130 712 7/4 7/6 7/8 7f1 0 7f12 7f14 7f16 7f18 7120 7122 7124 7126 7128
1 of 1
1800
1500
1200 -
"'C
~
900 .Q
-
G>
1U
600 et::
300
12/17/2003 12:23 PM
12/17/2003 12:23 PM
50000 100000 150000 200000 250000 300000 350000
Sum Injection (bbls)
"I
¡
I
MPS-09
I. MPS-09SS -MPS:-09LS I
)
1 of 1
+C
º= 300000
J:
~ 200000
E
~ 100000
o
o
......
.e 500000
CD
c 400000
600000
ole1.bmp (BMP Image, 642x376 pixels) )
)
MEMORANDUM
,
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Randy Ruedrich
Commissioner
DATE: July 20, 2003
l \ '7?
r:;7 1 1,'7.) ÐSUBJECT: Mechanical Integrity Test
,<e1¿i BPX
MPU S Pad
THRU: T'"Ðm Mé1undcr
P.I. Supervisor
FROM: Chuck Scheve
Petroleum Inspector
NON· CONFIDENTIAL
Packer Depth Pretest Initial 15 Min. 30 Min.
Well MPU 8-09 Type Inj. 8 TV.D. 4310 Tubing 1425 1425 1425 1425 Interval I
P.T.D. 202-020 Type test P Test psi 1078 Casing 600 2000 1975 1975 P/F f
Notes: Initial test
Well MPU 8-10 Type Inj. 8 TV.D. 4109 Tubing 1500 1500 1500 1500 Interval I
P.TD. 203-067 Type test P Test psi 1027 Casi ng 650 2000 1900 1900 P/F f
Notes: Initial test
Well MPU 8-16 Type Inj. 8 TV.D. 4070 Tubing 1250 1250 1250 1250 Interval I
P.T.D. 203-065 Type test P T est psi 1018 Casing 950 2025 1950 1950 P/F f
Notes: Initial test
Well MPU 8-18 Type Inj. 8 TV.D. 4238 Tubing 1450 1450 1450 1450 Interval I
P.T.D. 202-242 Type test P Test psi 1060 Casing 850 2000 1975 1975 P/F f
Notes: Initial test
Well MPU 8-26 Type Inj. 8 TV.D. 4089 Tubing 1450 1450 1450 1450 Interval I
P.T.D. 203-061 Type test P Test psi 1022 Casing 1400 2500 2475 2475 P/F f
Notes: Initial test
Type INJ. Fluid Codes Type Test Interval
F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test
G = GAS INJ. P= Standard Pressure Test 4= Four Year Cycle
S = SALTWATER INJ. R= Internal Radioactive Tracer Survey V= Required by Variance
N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover
D= Differential Temperature Test 0= Other (describe in notes)
/
v/
1"/'
;./
v'
Test's Details
I traveled to BPXs S Pad in the Milne Point Unit and wimessed the initial MIT on the above listed 5 wells that were
recently placed on injection. The pretest tubing and casing pressures were observed and found to be stable. The pressure
tests were then performed with all wells demonstrating good mechanical integrity.
M.I.T.'s pertormed: ~
Attachments:
Number ot Failures: º
Total Time during tests: 4 hours
cc:
MIT report form
5/12/00 L.G.
2003-0720_MIT _MPU_S-26_cs.xls
7/23/2003
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
)
'.)
1. Status of Well
o Oil 0 Gas D Suspended 0 Abandoned 181 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3346' NSL,491 WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
4642' NSL, 4286' WEL, SEC. 08, T12N, R11 E, UM X = 571768, Y = 6001365 10. Well Number
At total depth
4750' NSL, 4041' WEL, SEC. 08, T12N, R11E, UM X = 572011, Y = 6001475
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff
KBE = 73.2' ADL 380110
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
2/21/2002 / 2/25/2002 / 6/17/2003 ./
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
8923 4584 FT 8828 4516 FT 181 Yes D No
22. Type Electric or Other Logs Run
MWD, GR, RES, CCL, US IT
Classification of Service Well
Water Injection
7. Permit Number
202-020 303-154
8. API Number
50- 029-23067 -00
9. Unit or Lease Name
X = 565961, Y = 6000014 Milne Point Unit
MPS-09i
15. Water depth, if offshore 16. No. of Completions
NIA MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1800' (Approx.)
23.
CASING
SIZE
20"
7"
WT. PER FT.
92#
26#
GRADE
H-40
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
34' 112' 42" ~60 sx Arctic Set (Approx.)
34' 89141 9-7/8" 1461 sx Class ILl, 400 sx Class 'G'
AMOUNT PUllED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-5/8" Gun Diameter, 5 SPF
MD TVD MD TVD
OA Sands OA Sands
25.
TUBING RECORD
SIZE DEPTH SET (MD)
2-3/81" 4.6#, L-80 (Short) 85411
2-3/8",4.7#, L-80 (Long) 8637'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 58 Bbbls of Diesel.
PACKER SET (MD)
85261
86151
8554' - 8594' 43281 - 4354'
OB Sands
OB Sands
8654' - 8684'
4395' - 4416'
27.
Date First Production
Not On Injection
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
NIA
PRODUCTION FOR Oll-BBl
TEST PERIOD
GAs-McF
WATER-BBl
CHOKE SIZE
GAS-Oil RATIO
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
?8. CORE DATA
Brief description of lithology, porosity, fractu~es, appare~t dips and presence of oil, gas or water. Submit core C~ips.
Oll-BBl
GAs-McF
WATER-BBl
Oil GRAVITY-API (CORR)
1: ~I , .
I:~ -,':,"";:' l
1
.:
. / ..: .'~: 3U
, ~L ·_l.'1.:~_.c
~J'
.~~~... 2 2 .;
,0;1 .. '': "n03
.......: L~.J {,I J,
No core samples were taken.
'\
Form 10-407 Rev. 07-01-80
ORIGINAL
Submit In Duplicate
)
)
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
SF2_NA
8242'
4164'
SBF1_NB
8306'
4192'
SBE4_NC
8371'
4223'
SBE2_NE
8402'
4239'
SBE1_NF
8498'
4293'
TSBD_OA
8552'
4327'
TSBC
8603'
4360'
TSBB_OB
8653'
4394'
SBA5
8693'
4422'
Ji ~' !Fl
,,,lit 1. ¡j
?OD3
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys, Post Rig Work Summary.
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Sondra ~~ Title Technical Assistant
Date Ol~l7-Ò)
M PS-09i
Well Number
202-020 303-154
Permit No. I Approval No.
Prepared By Name/Number:
Drilling Engineer:
Sondra Stewman, 564-4750
Matt Green, 564-5581
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
OR\G\NAL
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-09
MPS-09
DRILL +COMPLETE
NABORS ALASKA DRILLING I
NABORS 27E
Start: 2/20/2002
Rig Release: 2/28/2002
Rig Number: 27E
Spud Date: 2/21/2002
End: 2/28/2002
. Date FrOm ~ To NPT Phase Descri ptionofQperations
2/19/2002 18:00 - 00:00 6.00 MOB P PRE MOVE RIG FROM S-31 i-TO S-09i - MOVE PIPE SHEDS -
MOTOR MODULE - PUMP MODULE ,. PIT MODULE - MOVE
SUB MODULE OFF WELL MPS-31 i
2/20/2002 00:00 - 08:00 8.00 RIGU P PRE FINISH MOVING RIG FROM S-31 ¡TO S-09i - WELL TO
WELL IN LINE MOVE - RELEASE TRUCKS AT 0800 HRS
08:00 - 15:00 7.00 RIGU P PRE HOOK UP ALL SERVICE LINES, BUILD BERMS AND SET
CUTTING TANK, GET STEAM TO ALL UNITS
ACCEPT RIG AT 1500 HRS 2/20/2002
15:00 - 20:00 5.00 BOPSURP INT1 NIPPLE UP 20" DIVERTER SYSTEM WITH 16" LINE -
INSTALL 4" WASH OUT VALVES ON CONDUCTOR PIPE
20:00 - 21 :30 1.50 BOPSURP INT1 CUT AND SLIP 170' DRILL LINE
21 :30 - 22:00 0.50 BOPSUR P INT1 SERVICE TOP DRIVE
22:00 - 23:00 1.00 BOPSURP INT1 ACTIVATE ACCUMULATOR - FUNCTION DIVETER SYSTEM
- VERIFY DIVERTER OPERATION
23:00 - 00:00 1.00 BOPSURP INT1 PICK UP 5" DRILL PIPE FROM PIPE SHED - DRIFT DRILL
PIPE
2/21/2002 00:00 - 05:00 5.00 BOPSUR P INT1 PU 5" DP FROM PIPE SHED - RABBIT EACH JOINT
05:00 - 06:00 1.00 BOPSUR P INT1 PREFORM FUNCTION TEST DIVERTER - ACCUMULATOR
TEST WITH AOGCC WITNESS JEFF JONES.
06:00 - 08:00 2.00 BOPSUR P INT1 CON'T PU 5" DP FROM PIPE SHED
08:00 - 08:30 0.50 BOPSUR P INT1 PRE SPUD MEETING
08:30 - 09:00 0.50 BOPSUR P INT1 TOP DRIVE SERVICE - RIG SERVICE
09:00 - 11 :30 2.50 DRILL P INT1 PU BHA - LOAD MWD
11 :30 - 12:00 0.50 DRILL P INT1 SURFACE TEST ALL MUD EQUIPMENT
12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONAL DRILL FROM 112' TO 1099' - SPUD WELL IN
AT 12:00 HRS - WOB 10K TO 25K - RPM 80 - TQ 3K - PP
1150 - GPM 375 - PU 85K - SO 85K - ROT 85K - ECD 9.54
2/22/2002 00:00 - 00:00 24.00 DRILL P INT1 DIRECTIONAL DRILLING - FROM 1099' TO 3637' - WOB 20K
TO 30K - RPM 80 - TQ 8K TO 9K - GPM 400 - PP 1450 - ECD
10.1 - PU 120K - SO 105K - ROT 115K
2/23/2002 00:00 - 03:30 3.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3637' TO 4076' - WOB 20K TO
25K - RPM 100 - TQ 9K TO 10K - GPM 400 - PP 1450 - PU
140K - SO 90 K - ROT 110K - ECD 10.17
03:30 - 05:00 1.50 DRILL P INT1 CIRCULATE 2 X BU - 6000 STKS - FOR BIT TRIP-
SHAKERS CLEAN
05:00 - 07:30 2.50 DRILL P INT1 PUMP OUT OF HOLE FROM 3919' TO 817' -100 STKS PER
MIN - 1300 PSI - NO PROBLEMS
07:30 - 08:00 0.50 DRILL P INT1 LD 12 JOINTS 5" HEVI-WEIGHT DP
08:00 - 11 :30 3.50 DRILL P INT1 CHANGE BIT'S - DOWN LOAD MWD - CHANGE MOTOR
FROM 1.5 TO 1.22 - UP LOAD MWD - TIH W / BHA - TEST
MWD
11 :30 - 12:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
12:00 - 14:30 2.50 DRILL P INT1 RIH FROM 456' TO 4076' - TIGHT HOLE AT 1700' TO 2000'
WORK THROUGH - REAM THROUGH BRIDGE 1850' TO
1870' - TIGHT TO 1990' - NO OTHER PROBLEMS ON TIH
14:30 - 00:00 9.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4076' TO 5809' - WOB 30K TO
35K - RPM 120 - TQ 10K - GPM 500 - PP 2200 - PU 152K-
SO 80K - ROT 115K - ECD 10.6
2/24/2002 00:00 - 10:00 10.00 DRILL P INT1 DIRECTIONAL DRILL FROM 5809' TO 6815' - WOB 30K TO
40K - RPM 120 - TQ 12K TO 14K - GPM 500 - PP 2450 - ECD
10.22 - PU 170K - SO 100K - ROT 120K
10:00 - 13:00 3.00 DRILL P INT1 CIRCULATE 14000K STKS FOR WIPER TRIP - STAND
BACK ONE STAND EVERY 30 MINS - ROTATE 120 RPM
Printed: 6/23/2003 11 :29:49 AM
')
)
BPEXPLORÄ'fION
.QperationsSummªry . Report ·
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-09
MPS-09
DRILL +COMPLETE
NABORS ALASKA DRILLING I
NABORS 27E
Date FrÖm·-.To HÖÜrs Task Code NPT Phase
2/24/2002 10:00 - 13:00 3.00 DRILL P INT1
13:00 - 18:30 5.50 DRILL P INT1
18:30 - 19:30 1.00 DRILL P INT1
19:30 - 20:30 1.00 DRILL N RREP INT1
20:30 - 00:00 3.50 DRILL P INT1
2/25/2002 00:00 - 00:30 0.50 DRILL P INT1
00:30 - 19:00 18.50 DRILL P INT1
19:00 - 23:30 4.50 DRILL P INT1
23:30 - 00:00 0.50 DRILL P INT1
2/26/2002 00:00 - 03:30 3.50 DRILL P INT1
03:30 - 04:00 0.50 DRILL P INT1
04:00 - 04:30 0.50 DRILL P INT1
04:30 - 08:30 4.00 DRILL P INT1
08:30 - 11 :30 3.00 DRILL P INT1
11 :30 - 15:30 4.00 DRILL P INT1
15:30 - 18:00 2.50 DRILL P INT1
18:00 - 18:30 0.50 DRILL P INT1
18:30 - 20:00 1.50 CASE P INT1
20:00 - 20:30 0.50 CASE P INT1
20:30 - 00:00 3.50 CASE P INT1
2/27/2002 00:00 - 06:30 6.50 CASE P INT1
06:30 - 07:30 1.00 CASE P INT1
07:30 - 08:00 0.50 CEMT P INT1
08:00 - 10:30 2.50 CEMT P INT1
10:30 - 14:00 3.50 CEMT P INT1
Start: 2/20/2002
Rig Release: 2/28/2002
Rig Number: 27E
Spud Date: 2/21/2002
End: 2/28/2002
Descri ption of Operations
AND RECIPROCATE PIPE - 500 GPM
PUMP OUT OF HOLE FROM 6468' TO 456' - WORKED
THROUGH TIGHT SPOTS FROM 2500' TO 1750' PUMPING
OUT - WORKING BACK UP AND DOWN WITHOUT PUMP
ON THE 2ND WIPE ON EACH STAND
LUBRICATE RIG - TOP DRIVE - DRAWWORKS
CHANGE CLUTCH ENGAGE VALVE ON DRAWWORKS-
CHANGE DIES IN TOP DRIVE GRIPPER
RIH FROM 456' TO 6090' - BRIDGE @ 1777' -1817' -1950'-
BACK REAM FROM 1850' TO 1777' - 1955' TO 1932' - CON'T
RIH - NO OTHER PROBLEMS
CON'T RIH FROM 6090' TO 6815'
DIRECTIONAL DRILL FROM 6815' TO 8923' - WOB 30K-
RPM 120 - TQ 14K - GPM 500 - PP 2650 - ECD 10.26 - PU
198K - SO 90K - ROT 135K
CBU 4 X FOR WIPER CONDITION TRIP FOR RUNNING 7"
CASING - STAND BACK STAND EVERY 30 MINS WHILE
CIRC - SHAKERS CLEAN
WIPER TRIP - MONITOR WELL - POH FROM 8530' TO 8188'
- TIGHT
ATTEMPT TO WORK THROUGH - BACK REAM FROM 8190'
TO 8140' - CON'T POH - PU WITH OUT PUMP 205 - SO 85
POOH - HOLE IN EXCELLENT SHAPE FROM 8100' NO
PROBLEMS PULL TO 456'
CLEAN RIG FLOOR
RIG SERVICE - TOP DRIVE SERVICE
RIH FROM 456' TO 8923' - TIGHT 7890' - WORK TROUGH -
FILLING EVERY 25 STANDS
CBU 4 X - 24000 STKS - CONDITION MUD TO RUN CASING
-130 STKS - 550 GPM - RPM 120 - ROTATE 1
RECIPROCATE STRING WHILE CIRC
POH TO RUN CASING FROM 8923' TO 456' BHA. NO
PROBLEMS PULLING OUT OF HOLE.
LAY DOWN BHA - DOWN LOAD MWD
CLEAR - CLEAN FLOOR
RIG UP CASING EQUIPMENT - HOLD SAFETY MEETING
PJSM (ON RUNNING CASING)
PU SHOE JOINT - RUNNING 7" CASING - 55 JOINTS
PICKED UP AT 00:00 HRS
RUNNING 7" CASING - LAND CASING ON HANGER - SO
75K - RAN 215 JOINTS 26# BTC L-80
CIRCULATE AND CONDITION HOLE WITH FRANK'S FILL
UP TOOL AT 80 SPM - 338 GPM - 300 PSI.
RIGGED DOWN FILL UP TOOL AND RIGGED UP
CEMENTING HEAD WITH WASH UP LINE.
CIRCULATE AND CONDITION HOLE FOR CEMENT JOB. 80
SPM - 338 GPM - 300 PSI.
PUMP 5 BBLS WATER - TEST LINES TO 3500 PSI - PUMP
45 BBLS WATER -PUMPED 50 BBLS OF 10.2 PPG ALPHA
SPACER WITH RED DYE - DROPPED BOTTOM PLUG WITH
LAST 5 BBLS OF SPACER - MIXED AND PUMPED 1460 SXS
(1080 BBLS) OF CLASS L CEMENT MIXED IN A 10.7 PPG
SLURRY WITH A YIELD OF 4.15 CFT/SX. PUMPED LEAD
Printed: 6/23/2003 11 :29:49 AM
)
')
BP··EXPLORATION
Qp~rélti()ns S.Ûrnrnary RèPØrt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-09
MPS-09
DRILL +COMPLETE
NABORS ALASKA DRILLING I
NABORS 27E
Date From.. To Hours Task ·Code· NPT Phase
2/27/2002 10:30 -14:00 3.50 CEMT P INT1
14:00 - 15:30
INT1
1.50 CEMT P
15:30 - 16:00
16:00 - 17:00
17:00 - 00:00
0.50 CEMT P
1.00 CEMT P
7.00 CEMT N
INT1
INT1
SFAL INT1
2/28/2002
2.00 CASE N
SFAL INT1
00:00 - 02:00
02:00 - 03:30
03:30 - 08:00
1.50 BOPSUR P
4.50 WHSUR P
INT1
INT1
08:00 - 11 :00
3.00 WHSUR P
INT1
11 :00 - 20:00 9.00 DRILL P INT1
20:00 - 21 :00 1.00 DRILL P INT1
21 :00 - 23:30 2.50 DRILL P INT1
23:30 - 00:00 0.50 DRILL P INT1
6/12/2003 08:00 - 08:30 0.50 MOB P CaMP
08:30 - 09:30 1.00 MOB P CaMP
09:30 - 10:30 1.00 MOB P CaMP
10:30 - 11 :30 1.00 WHSUR P CaMP
11 :30 - 12:00 0.50 WHSUR P CaMP
12:00 - 14:30 2.50 BOPSUR P CaMP
14:30 - 15:30 1.00 BOPSUR P CaMP
15:30 - 16:00 0.50 BOPSUR P CaMP
16:00 - 19:00 3.00 BOPSUR P CaMP
Start: 2/20/2002
Rig Release: 2/28/2002
Rig Number: 27E
Spud Date: 2/21/2002
End: 2/28/2002
Description of Operations
CEMENT UNTIL LEAD CEMENT WAS SEEN AT SURFACE.
MIXED AND PUMPED 400 SXS (81 BBLS) PREMIUM
CEMENT + 1 % CALCIUM CHLORIDE + .3% HALAD 344 +
.2% CFR-3 MIXED IN AT 15.8 PPG SLURRY WITH A YIELD
OF 1.15 CFT/SX.
WASHED OUT LINES. DROPPED TOP PLUG. DISPLACE
CEMENT WITH 220 BBLS OF 11.0 PPG BRINE AND 116
BBLS OF DIESEL. PUMPED PLUG WITH 2840 PSI (1000 PSI
OVER CIRCULATING) AT 1520 HRS. HAD FULL RETURNS
THROUGHOUT CEMENTING JOB. HAD 419 BBLS OF
CEMENT TO SURFACE.
FLUSHED DIVERTER WITH FRESH WATER.
RIG DOWN CASING EQUIPMENT
ATTEMPT TO BACK OUT LANDING JOINT - RIG UP RIG
TONG FOR BACK UP ON HANGER IN CELLER - RIG UP
POWER TONGS IN CELLER TO ATTEMPT TO BACK OUT
LANDING JOINT - NO SUCCESS - ATTEMPT TO USE RIG
TONG ON FLOOR AND POWER TONGS IN CELLER -
CRUSHED LANDING JOINT ON RIG FLOOR WITH RIG
TONGS
RIG DOWN POWER TONGS IN CELLER - RIG UP RIG
TONGS IN CELLER - BACK OUT LANDING JOINT - LAY
DOWN LANDING JOINT - THREADS SEVERL Y GALLED ON
BOTTOM THREADS OF RUNNING TOOL AND HANGER
NIPPLE DOWN DIVERTER
NIPPLE UP GEN 6 WELLHEAD - TEST VOID 1000 PSI. TEST
FAILED. PULLED WELLHEAD AND CHANGED a-RING.
INSTALLED GEN 6 WELLHEAD. TEST VOID TO 1000 PSI
FOR 10 MINUTES. GOOD TEST. INSTALL TUBING HEAD
AND 7" TOP VALVE. RIGGED UP TO TEST.
HELD PJSM ON TESTING CASING AND WELLHEAD.
RIGGED UP HB&R. TESTED WELLHEAD AND CASING TO
4500 PSI FOR 30 MINUTES AND RECORDED ON CHART.
BLED OFF PRESSURE. AND INSTALLED BPV. PRESSURE
TESTED BPV TO 1000 PSI FOR 30 MINUTES AND
RECORDED ON CHART.
HELD PJSM ON LAYING DOWN DRILL PIPE. LAID DOWN 5"
DRILL PIPE FROM DERRICK IN MOUSEHOLE.
UNLOAD 5" DP FROM PIPE SHED
CUT DRLG LINE
SERVICE TOP DRIVE AND RIG - RELEASE RIG AT 23:59
HRS ON 02-28-2002
Skid rig floor to move position
Move rig from well 26i to well 09i
Skid rig floor to drlg position - Rig up floor - Accept rig 10:30
hrs on 6/12/2003
Take on Brine - Nipple down tree - Nipple down tubing spool -
Nipple up Dual Tubing spool
Make dummy run with Dual hanger halves
Nipple up BOP's - Make up double annulus valve
Change out top rams from Dual 2 3/8" to 2 7/8" X 5" variable
Rig up BOP testing equipment
Test BOP's - Annular 250 low 3500 high 5 mins each test - Top
Printed: 612312003 11 :29:49 AM
')
)
laP' EXPLORATION
Opøré1tion$'$U:nlrtíary .Rep:ort
Page4of6
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-09
MPS-09
DRILL +COMPLETE
NABORS ALASKA DRILLING I
NABORS 27E
Start: 2/20/2002
Rig Release: 2/28/2002
Rig Number: 27E
Spud Date: 2/21/2002
End: 2/28/2002
Date From-To Hours Task Code NPT . Phase Description of Operations·
6/12/2003 16:00 - 19:00 3.00 BOPSUR P COMP Rams / Bottom Rams / Blind Rams / Choke Manifold / Upper -
Lower IBOP valves - Floor / Dart valves - Hyd Choke / Kill
valves - Manual Choke / Kill valves - 250 low 3500 high - 5
mins each test - all test were good - John Crisp with AOGCC
witnessed the test
19:00 - 19:30 0.50 BOPSUR P COMP Rig down testing equipment - Pull test plug - Install wear ring -
Close annulus valves
19:30 - 20:30 1.00 CLEAN P COMP Make up HTC AT J-4 6.125" bit - 7" 26# casing scraper - Bit sub
(with float installed) - 12 / 4 3/4" dcs - XO
20:30 - 22:30 2.00 CLEAN P COMP RIH with 4" singles to 3180'
22:30 - 23:30 1.00 CLEAN P COMP Break circulation - Displace out freeze protection (diesel) from
well with 8.9 ppg Brine - GPM 357 - PP 1000 - Shut down for
30 mins letting diesel migrate - Pump additional 15 bbls - Brine
cleaned up - Recovered 110 bbls of diesel for recycle
23:30 - 00:00 0.50 CLEAN P COMP Con't RIH with 4" singles from 3180' to 3540'
6/13/2003 00:00 - 04:30 4.50 CLEAN P COMP Con't RIH with 4" singles from 3450' to 8828' float collar
04:30 - 05:00 0.50 CLEAN P COMP Break circulation - Displace 11 ppg brine from well with 8.9 ppg
brine - GPM 360 - PP 2800 - Reciprocate - RPM 77 - TQ 7K to
8K
05:00 - 05:30 0.50 CLEAN P COMP Cut Drlg Line - Rig Service - Top Drive service
05:30 - 06:00 0.50 CLEAN P COMP Test 7" casing to 3500 psi for 30 mins - ok
06:00 - 06:30 0.50 CLEAN P COMP Spot 9.5 bbl Hi-Vis pill on bottom
06:30 - 08:30 2.00 CLEAN P COMP POH with clean out BHA
08:30 - 10:00 1.50 CLEAN P COMP LID BHA - PJSM - Make up Howco EZSV Perf gun
10:00 - 14:00 4.00 PERF P COMP RIH with EZSV Perf gun to 8596' - Perforate 7" casing @ 8594'
to 8596'
14:00 - 15:00 1.00 PERF P COMP Set EZSV - test Annulus to 1000 psi - Pressure up to 2300 psi
with 1000 psi on annulus - fire perf gun - Injection rate 1.5 bpm
@ 1080 psi - Shear off packer @ 60K over string weight -
Rotate right 25 turns - Sting back into packer - re-establish
injection rate of 1.5 bpm 1080 psi - unsting from packer - Close
annular - Open choke - Take returns through choke
15:00 - 17:30 2.50 CEMT P COMP PJSM - Pump 5 bbls water - Test lines to 3500 psi - Mix and
spot 20 bbls 15.8# premium cement followed by 5 bbls of water
and 61 bbls displacement - holding 400 psi back pressure on
choke while spotting cement to packer - Sting into retainer -
squeezed 5 bbls water 11 bbls cement at 1 bpm @ 1000 psi -
Slowed pumps to .5 bpm squeezed additional 6 bbls cement @
1060 psi - held pressure for 5 mins with final pressure @ 1060
psi - unsting from retainer - left 3 bbls cement on top of retainer
17:30 - 19:00 1.50 CEMT P COMP Pull out of hole 2 stands @ 8400' - Reverse out 2 drill pipe
volumes 180 bbls at 6 bpm 1000 psi - Then circ 2 bottoms up
conventional at 7 bpm @ 1500 psi
19:00 - 22:00 3.00 CEMT P COMP POH with running tools
22:00 - 23:00 1.00 CEMT P COMP Lay down running tool - Make up clean out BHA - Bit - 2 Junk
Baskets - bit sub with float - 12 / 43/4" dcs - xo
23:00 - 00:00 1.00 CEMT P COMP RIH with clean out assembly to 3266'
6/14/2003 00:00 - 01 :30 1.50 CEMT P COMP Con't RIH with clean out assembly from 3266' to 8432'
01 :30 - 03:30 2.00 CEMT P COMP Circ vis up mud for drilling cement retainer and cement - Load
pipe shed with 2 3/8" tubing for completion -
03:30 - 07:00 3.50 CEMT P COMP RIH tag up @ 8536' - Drill cement / retainer / guns from 8536'
to 8828' float collar.
Printed: 6/23/2003 11 :29:49 AM
)
'>
E3p··EXPLORATION
OperationsSumnlétryReport
Page 5 of6
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
M PS-09
MPS-09
DRILL +COMPLETE
NABORS ALASKA DRILLING I
NABORS 27E
Start: 2/20/2002
Rig Release: 2/28/2002
Rig Number: 27E
Spud Date: 2/21/2002
End: 2/28/2002
Date Frorn- To Hours Task ·Code NPT ... Phase Oescri ptionof. Operations
6/14/2003 07:00 - 08:00 1.00 CEMT P COMP Pump Hi-vis sweep - Displace with clean 8.9# Brine
08:00 - 10:30 2.50 CEMT P COMP POH with clean out assembly - Recovered +- 1.5 pounds of
junk from J-baskets
10:30 - 11 :00 0.50 CEMT P COMP Lay down BHA - Clear rig floor
11 :00 - 13:00 2.00 PERF P COMP PJSM - Pick up Howco perforating guns and BHA
13:00 - 15:00 2.00 PERF P COMP RIH with Howco perforating guns - Taking weight @ 3900' -
Work down hole to 4100'
15:00 - 16:30 1.50 PERF P COMP POH with Howco guns for scraper run
16:30 - 18:00 1.50 PERF P COMP PJSM - Lay down - BHA - Howco perforating guns
18:00 - 19:30 1.50 CLEAN P COMP Pick up 6.125" bit - 7" 26# scaper - 2 Junk baskets - 12 4 3/4"
dcs - jars - 5 hwdp - xo
19:30 - 23:00 3.50 CLEAN P COMP RIH to 8825' - Encountered junk @ 3887', 3925', 3966',4008',
4089',4131',4213',4253',4421',4499',4667',4702' - Set
down weight from 20K to 30K - Work each spot till clean - From
4702' to 8825' no other junk was encountered - Hole clean
23:00 - 00:00 1.00 CLEAN P COMP POH for perforating guns @ 7000'
6/15/2003 00:00 - 02:00 2.00 CLEAN P COMP POH with clean out assembly from 7000' to BHA - No overpulls
seen on trip out - Hole in good shape - Lay down bha -
Recovered +- 3 pounds of junk from J-baskets
02:00 - 02:30 0.50 PERF P COMP PJSM - Handling Howco guns - Clear rig floor
02:30 - 03:00 0.50 PERF P COMP Pick up Howco perforating guns - BHA
03:00 - 07:00 4.00 PERF P COMP RIH with Howco guns to 8701'.
07:00 - 11 :30 4.50 PERF P COMP Held PJSM with rig crew and Schlumberger. Rigged up wireline
and started in hole with 1-11/16" 00 GR/CCL to 3700'.
Pumped and worked tool down hole pumping 4BPM @ 450 psi
to annular pressure crossover at 8505'. Logged up to 7980' and
confirmed correlation. Pulled out of hole with logging tools.
Rigged down wireline.
11 :30 - 12:00 0.50 PERF P COMP Pulled up hole 13.5' to set guns on depth. Set champ packer
and closed annular. Pressured up on annulus to 3000 psi and
held for 1 minute. Bled off pressure and opened annular
perventor. Gun fired. Perforated 'OA' from 8554' - 8594' and
'OB" from 8654' - 8684', Shot 5 shots/ft with 60 degree phasing.
Released champ packer and hole took approximately 2 bbls.
12:00 - 12:30 0.50 PERF P COMP Pulled two stands of drill pipe and monitored well with hole fill.
Hole stable. Pulled out of hole with guns.
12:30 -15:00 2.50 PERF P COMP Pull out of hole with Howco guns
15:00 - 16:30 1.50 PERF P COMP PJSM - Lay down bha - Howco perforating gun assembly - (all
shots fired)
16:30 - 17:00 0.50 PERF P COMP Clear rig floor of all Howco tools
17:00-17:30 0.50 CLEAN P COMP Make up clean out BHA - Bit - 7" 26# casing scraper - 2
J-baskets - Bit sub - 12 4 3/4" dc's - jars - 5 3 1/2" hwdp - xo
17:30 - 20:30 3.00 CLEAN P COMP RIH to 8650' - (No tight spots seen on trip in)
20:30 - 00:00 3.50 CLEAN P COMP Pull out of hole laying down drill pipe
6/16/2003 00:00 - 02:00 2.00 CLEAN P COMP Lay down Drill pipe from 2900' to bha
02:00 - 02:30 0.50 CLEAN P COMP Lay down BHA
02:30 - 03:30 1.00 RUNCOfvP COMP Change top rams to 2 3/8" dual rams - Change bails - rig up
dual commpletion equipment -
03:30 - 04:30 1.00 RUNCOfvP COMP Test top rams to 250 low 3500 high 5 mins each test - floor
safety valves 250 low 3500 high 5 mins - rig down test joint -
pull test plug
04:30 - 05:00 0.50 RUNCOfvP COMP PJSM - Run 2 3/8" Dual completion - Pick up packers tail pipe
assembly make up - same
Printed: 6/23/2003 11 :29:49 AM
,)
)
Page6of6
·BPEXPLORATION
OperationsStunl11~.ry .·Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-09
MPS-09
DRILL +COMPLETE
NABORS ALASKA DRILLING I
NABORS 27E
Date
From ~To Hours Task Code NPT Phase
6/16/2003
05:00 - 16:00
11.00 RUNCOrvP
COMP
16:00-21:00
5.00 RUNCOrvP
COMP
21 :00 - 22:30 1.50 RUNCOrvP COMP
22:30 - 23:00 0.50 WHSUR P COMP
23:00 - 00:00 1.00 BOPSUR P COMP
6/17/2003 00:00 - 01 :00 1.00 BOPSURP COMP
01 :00 - 03:00 2.00 WHSUR P COMP
03:00 - 05:00 2.00 CHEM P COMP
05:00 - 09:00 4.00 RUNCOrvP COMP
09:00 - 10:00
1.00 RUNCOrvP
COMP
Start: 2/20/2002
Rig Release: 2/28/2002
Rig Number: 27E
Spud Date: 2/21/2002
End: 2/28/2002
Description of Operations
Running 2 3/8" Dual assembly - hanging up on junk +/- 5930' -
con't running tubing pushing junk to 8650'
PJSM - Rig up Schlumberger E-Line for correlation to set
packers on depth - RIH with GR/CCL for correlation - RIH to
3600' - start pumping tool down 1/4 bpm at 900 psi - tool stuck
in XN nipple - pulling 3400 line tension - 1000 over shear out of
rope socket - work tool free - correlate packers on depth - poh
with CCLlGR - Rig down Schlumberger
Space out - land tubing - PU 120K - SO 65K
RILDS - Lay down landing joints - Test TWC to 1000 psi from
above
Change top Dual Rams to 27/8" X 5" variable
Nipple down BOP's
Nipple up adapter flange - Dual tree - test to 5K for 10 mins -
Pull TWC's
Circulating Clean Brine - Reverse circulate corexit in well for
corrision protection - Pump 58 bbls diesel in annulus for freeze
protection -
Drop 1 3/4" steel ball on Long string pumping ball to seat with
rig pump - BPM .5 - PP 1120 - Ball on seat - set packers - test
string to 3000 psi for 30 mins - shear out ball with 3900 psi -
Test annulus to 2000 psi for 30 mins - Drop ball in short string
- pump ball on seat with rig pump 1 1/2 bpm 2000 psi - Ball on
seat - test short string to 3000 psi for 30 mins - Shear out ball
with 3700 psi -
Install BPV's - Rig down lines - Secure well - Release rig At
10:00 hrs on 6/17/2003
Printed: 6/23/2003 11 :29:49 AM
)
)
Well:
Field:
API:
Permit:
MPS-09i
Milne Point Unit
50-029-23067 -00
202-020
Accept:
Spud:
Release:
RiQ:
02/20103
02/21/03
06/17/03
D-14
POST-RIG WORK
06/17/03
ARRIVED LOCATION, HELD PRE-JOB SAFETY MEETING, PRESSURE TESTED TO 3000 PSI.
START DOWN THE SHORT STRING WITH 8 BBLS DIESEL @ .4 BPM WI 1150 PSI MAX.
SWITCHED TO LONG STRING AND PUMPED 8 BBLS DIESEL @ .2 BPM WI 1200 PSI MAX.
RATES WERE HINDERED BY THE BACK PRESSURE VALVE AND REQUIREMENT TO KEEP
INJECTION PSI BELOW 1200.
06/20/03
PERFORM SBHP SURVEY'S ON BOTH STRINGS, PULLED RHC FROM SHORT STRING. ON THE
SHORT STRING THE SBHP WAS TAKEN @ 4087' WLM (4107' MD) DUE TO INABILITY TO WORK
THE GAUGES DOWN THE WELLBORE.
06/26/03
OPEN ALL BLANKETS, CHOKES, AND BLOCK VALVES. INSURED MAIN HEADER VALVE WAS
SHUT IN AND BOTH WING VALVES WERE SHUT. PRESSURED UP ON INJECTION LINES
HOLDING AT 500 PSI. GOOD TEST. BROUGHT PRESSURE UP TO 2000-PSI GOOD TEST.
BROUGHT PRESSURE UP TO 3650-PSI GOOD TEST. BLED BACK PRESSURE OFF INJECTION
LINES.
')
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well MPS-09
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
'MD
(if applicable)
8,923.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
aOd-O~O
)
18-Mar-02
RECEIVED
t..~ .~ Q f) 0 "DO?
I ,:"\.. L L _
Alaska Oil & Gas Cons. Commission
Anchorage
DE¡:INIT/~
BP EXPLORA TION (ALASKA) INC. E
Milne Point Unit
BPXA
MPS-Pad, Slot MPS-09
MPS-09
Job No. AKZZ22033, Surveyed: 25 February, 2002
c_~
SURVEY REPORT
15 March, 2002
Your Ref: API 500292306700
Surface Coordinates: 6000013.87 N, 565960.74 E (70024' 37.7149" N, 149027'46.4250" W)
Kelly Bushing: 73.2Oft above Mean Sea Level
c_.
5ï-..=i'~""'Y-!5U"
DRILLING SERViceS
A Halliburton Company
Survey Ref: svy10067
Sperry-Sun Drilling Services .
Survey Report for MPS-09 )EF N TIVE
Your Ref: API 500292306700
Job No. AKZZ22033, Surveyed: 25 February, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit MPS-Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r /1 OOft)
0.00 0.000 0.000 -73.20 0.00 O.OON O.OOE 6000013.87 N 565960.74 E 0.00 AK-6 BP _'FR-AK
201.85 0.600 272.410 128.65 201.85 0.04 N 1.06W 6000013.91 N 565959.68 E 0.297 -1.02
292.78 0.650 161.220 219.57 292.77 0.42 5 1.37W 6000013.43 N 565959.38 E 1.135 -1.43
384.11 2.460 130.050 310.87 384.07 2.185 0.30 E 6000011.70 N 565961.06 E 2.117 -0.19
476.50 5.370 139.160 403.03 476.23 6.725 4.65E 6000007.19 N 565965.45 E 3.211 3.05 -.
565.16 8.090 143.580 491.07 564.27 14.885 11.07 E 5999999.08 N 565971.94 E 3.121 7.50
656.57 11 .990 145.610 581.07 654.27 27.905 20.25 E 5999986.15 N 565981.24 E 4.283 13.58
747.93 14.500 143.170 669.99 743.19 44.89 5 32.47 E 5999969.27 N 565993.60 E 2.814 21.74
840.91 14.750 138.980 759.96 833.16 63.145 47.22 E 5999951.15 N 566008.51 E 1.169 32.09
936.89 16.820 138.800 852.32 925.52 82.81 5 64.38 E 5999931.64 N 566025.85 E 2.157 44.49
1030.16 19.070 141.500 941 .04 1014.24 104.895 82.76 E 5999909.72 N 566044.42 E 2.571 57.53
1124.64 19.450 142.600 1030.24 1103.44 129.46 5 101.92E 5999885.31 N 566063.80 E 0.556 70.79
1217.35 21.370 140.940 1117.12 1190.32 154.84 5 121.94E 5999860.11 N 566084.05 E 2.163 84.70
1311 .79 22.160 142.130 1204.83 1278.03 182.26 5 143.72 E 5999832.88 N 566106.06 E 0.958 99.88
1406.16 24.110 138.480 1291.61 1364.81 210.755 167.43 E 5999804.61 N 566130.02 E 2.564 116.70
1499.31 26.330 139.420 1375.88 1449.08 240.69 5 193.48 E 5999774.90 N 566156.34 E 2.422 135.49
1593.69 26.680 138.830 1460.34 1533.54 272.53 5 221.04 E 5999743.30 N 566184.18 E 0.464 155.34
1686.52 29.680 140.250 1542.16 1615.36 305.90 5 249.47 E 5999710.18 N 566212.90 E 3.311 175.68
1781.31 29.850 140.790 1624.44 1697.64 342.22 5 279.38 E 5999674.13 N 566243.14 E 0.335 196.83
1876.66 33.750 142.270 1705.46 1778.66 381.575 310.61 E 5999635.06 N 566274.70 E 4.171 218.58
1968.63 40.270 140.990 1778.87 1852.07 424.92 5 344.99 E 5999592.01 N 566309.4 7 E 7.138 242.53 ~
2063.56 41.070 137.030 1850.88 1924.08 471.595 385.56 E 5999545.70 N 566350.45 E 2.846 271.79
2156.60 42.140 131.260 1920.47 1993.67 514.555 429.88 E 5999503.13 N 566395.14 E 4.274 305.51
2250.13 43.320 127.200 1989.19 2062.39 554.65 5 479.03 E 5999463.47 N 566444.65 E 3.204 344.58
2343.89 43.270 122.070 2057.45 2130.65 591.175 531.89 E 5999427.42 N 566497.83 E 3.752 388.07
2436.84 43.330 116.810 2125.12 2198.32 622.48 5 587.37 E 5999396.60 N 566553.59 E 3.881 435.25
2524.84 44.170 108.150 2188.75 2261.95 645.67 5 643.50 E 5999373.91 N 566609.92 E 6.868 484.87
2624.63 44.800 102.770 2259.96 2333.16 664.285 710.85 E 5999355.90 N 566677.43 E 3.829 546.44
2717.64 45.400 97.740 2325.64 2398.84 675.98 5 775.64 E 5999344.76 N 566742.32 E 3.884 607.04
2810.99 46.340 91.110 2390.67 2463.87 681.12 5 842.38 E 5999340.22 N 566809.10 E 5.195 670.99
- -------------------
--------
15 March, 2002 - 7:29
Page 2 0'6
DrillQuest 2.00.09.003
Sperry-Sun Drilling Services .
Survey Report for MPS-09
Your Ref: API 500292306700
Job No. AKZZ22033, Surveyed: 25 February, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit MPS-Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
2906.60 47.530 87.130 2455.97 2529.17 680.02 S 912.19 E 5999341.93 N 566878.90 E 3.286 739.32
3001 .14 50.560 86.880 2517.93 2591.13 676.29 S 983.48 E 5999346.29 N 566950.16 E 3.211 809.67
3094.77 52.960 86.690 2575.88 2649.08 672.16 S 1056.90 E 5999351.07 N 567023.53 E 2.568 882.18
3188.95 55.990 85.100 2630.60 2703.80 666.66 S 1133.34 E 5999357.25 N 567099.92 E 3.498 957.95
3284.82 60.440 82.190 2681.09 2754.29 657.59 S 1214.29 E 5999367.03 N 567180.79 E 5.310 1038.90 ~
3378.67 64.290 79.650 2724.62 2797.82 644.44 S 1296.36 E 5999380.90 N 567262.74 E 4.751 1121.85
3472.59 67.160 76.860 2763.24 2836.44 626.99 S 1380.16 E 5999399.09 N 567346.38 E 4.083 1207.43
3565.76 70.190 73.880 2797.12 2870.32 605.06 S 1464.11 E 5999421.77 N 567430.14 E 4.410 1294.16
3661.68 73.410 69.820 2827.09 2900.29 576.65 S 1550.66 E 5999450.93 N 567516.43 E 5.237 1384.84
3754.94 74.490 66.970 2852.88 2926.08 543.65 S 1633.97 E 5999484.67 N 567599.45 E 3.157 1473.39
3849.45 74.830 66.420 2877.88 2951.08 507.59 S 1717.68 E 5999521.47 N 567682.83 E 0.667 1562.99
3945.28 75.830 66.130 2902.15 2975.35 470.29 S 1802.55 E 5999559.51 N 567767.37 E 1.084 1654.01
4050.96 77.910 66.450 2926.15 2999.35 428.91 S 1896.77 E 5999601.73 N 567861.23 E 1.990 1755.05
4146.43 77.800 66.960 2946.24 3019.44 392.00 S 1982.50 E 5999639.39 N 567946.62 E 0.535 1846.81
4239.26 77.790 66.940 2965.86 3039.06 356.48 S 2065.98 E 5999675.65 N 568029.79 E 0.024 1936.09
4331.39 77.730 66.890 2985.40 3058.60 321.18 S 2148.81 E 5999711.68 N 568112.30 E 0.084 2024.67
4423.46 74.540 66.920 3007.46 3080.66 286.12 S 2231.02 E 5999747.47 N 568194.20 E 3.465 2112.60
4515.55 73.620 66.740 3032.72 3105.92 251.27 S 2312.44 E 5999783.03 N 568275.31 E 1.017 2199.70
4608.76 73.480 66.040 3059.11 3132.31 215.47 S 2394.35 E 5999819.55 N 568356.90 E 0.736 2287.50
4702.87 73.770 66.610 3085.64 3158.84 179.21 S 2477.04 E 5999856.54 N 568439.27 E 0.658 2376.16
4796.22 73.760 67.000 3111.74 3184.94 143.91 S 2559.42 E 5999892.57 N 568521.33 E 0.401 2464.31 -
4890.82 74.250 67.240 3137.81 3211.01 108.56 S 2643.21 E 5999928.66 N 568604.80 E 0.573 2553.83
4984.73 74.250 66.780 3163.30 3236.50 73.26 S 2726.41 E 5999964.70 N 568687.69 E 0.471 2642.78
5080.28 74.720 66.470 3188.86 3262.06 36.73 S 2810.92 E 6000001.97 N 568771.88 E 0.583 2733.28
5176.19 74.430 66.720 3214.37 3287.57 O.OON 2895.77 E 6000039.44 N 568856.40 E 0.393 2824.14
5271.00 74.100 66.200 3240.08 3313.28 36.44 N 2979.43 E 6000076.63 N 568939.74 E 0.632 2913.79
5364.14 74.390 66.450 3265.37 3338.57 72.44 N 3061.53 E 6000113.34 N 569021.51 E 0.405 3001.82
5457.87 74.380 66.660 3290.60 3363.80 108.36 N 3144.35 E 6000149.99 N 569104.01 E 0.216 3090.52
5552.72 73.400 65.780 3316.92 3390.12 145.10 N 3227.74 E 6000187.47 N 569187.07 E 1.365 3179.97
5645.72 73.240 66.960 3343.61 3416.81 180.81 N 3309.35 E 6000223.90 N 569268.36 E 1.228 3267.46
-------------
15 March, 2002 - 7:29
Page 30f6
DrillQuest 2.00.09.003
Sperry-Sun Drilling Services .
Survey Report for MPS-D9
Your Ref: API 500292306700
Job No. AKZ222033, Surveyed: 25 February, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit MPS-Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1000)
5741.03 72.830 67.790 3371.42 3444.62 215.88 N 3393.50 E 6000259.71 N 569352.20 E 0.937 3357.28
5833.19 72.500 67.330 3398.88 3472.08 249.46 N 3474.81 E 6000294.00 N 569433.21 E 0.596 3444.00
5926.69 72.320 66.680 3427.14 3500.34 284.27 N 3556.85 E 6000329.55 N 569514.94 E 0.690 3531.71
6019.74 71.640 67.460 3455.93 3529.13 318.75 N 3638.35 E 6000364.74 N 569596.13 E 1.081 3618.81
6116.30 73.480 67.160 3484.86 3558.06 354.28 N 3723.33 E 6000401.02 N 569680.80 E 1.928 3709.55 ~~
6210.63 73.980 67.040 3511.29 3584.49 389.52 N 3806.75 E 6000436.99 N 569763.90 E 0.544 3798.69
6306.15 73.480 66.990 3538.05 3611.25 425.33 N 3891.16 E 6000473.54 N 569847.99 E 0.526 3888.93
6397.51 73.310 65.930 3564.16 3637.36 460.29 N 3971.43 E 6000509.22 N 569927.95 E 1.127 3974.94
6492.76 73.250 65.270 3591.57 3664.77 497.98 N 4054.50 E 600054 7 .63 N 570010.68 E 0.667 4064.28
6586.93 73.570 65.110 3618.45 3691.65 535.85 N 4136.42 E 6000586.23 N 570092.27 E 0.377 4152.55
6681.93 73.710 65.350 3645.21 3718.41 574.04 N 4219.19 E 6000625.15 N 570174.69 E 0.284 4241.71
6776.20 73.820 63.930 3671.57 3744.77 612.80 N 4300.97 E 6000664.63 N 570256.13 E 1.451 4330.04
6871 . 1 3 74.260 64.740 3697.67 3770.87 652.33 N 4383.24 E 6000704.89 N 570338.05 E 0.942 4419.01
6966.16 74.890 64.880 3722.95 3796.15 691.32 N 4466.13 E 6000744.61 N 570420.59 E 0.678 4508.4 7
7060.05 74.670 64.220 3747.60 3820.80 730.25 N 4547.94 E 6000784.26 N 570502.05 E 0.718 4596.86
7155.56 74.860 63.930 3772.69 3845.89 770.54 N 4630.82 E 6000825.28 N 570584.57 E 0.354 4686.60
7248.77 74.830 64.130 3797.06 3870.26 809.94 N 4711.70 E 6000865.39 N 570665.11 E 0.210 4774.19
7342.14 74.490 65.360 3821.76 3894.96 848.35 N 4793.14 E 6000904.52 N 570746.20 E 1.322 4862.10
7431.99 74.030 65.840 3846.14 3919.34 884.08 N 4871.89 E 6000940.94 N 570824.64 E 0.726 4946.80
7530.69 74.140 65.770 3873.20 3946.40 922.98 N 4958.47 E 6000980.61 N 570910.87 E 0.131 5039.84
7619.90 75.270 65.400 3896.73 3969.93 958.55 N 5036.83 E 6001016.86 N 570988.90 E 1.328 5124.12
7711.20 74.800 65.580 3920.31 3993.51 995.14 N 5117.08 E 6001054.16 N 571068.83 E 0.549 5210.47
7806.58 73.980 64.730 3945.98 4019.18 1033.74 N 5200.44 E 6001093.49 N 571151.85 E 1.215 5300.30
7899.73 71 .990 65.650 3973.23 4046.43 1071.11 N 5281.28 E 6001131.58 N 571232.36 E 2.336 5387.41
7992.23 72.330 66.250 4001.57 4074.77 1107.00 N 5361.69 E 6001168.18 N 571312.45 E 0.719 5473.76
8089.02 70.560 66.660 4032.37 4105.57 1143.65 N 5445.81 E 6001205.57 N 571396.24 E 1.872 5563.90
8180.00 67.100 67.140 4065.22 4138.42 1176.94 N 5523.83 E 6001239.54 N 571473.96 E 3.835 5647.35
8273.59 63.880 67.060 4104.04 4177.24 1210.07 N 5602.27 E 6001273.37 N 571552.10 E 3.441 5731.17
8364.67 60.430 67.620 4146.58 4219.78 1241.09 N 5676.57 E 6001305.05 N 571626.13 E 3.827 5810.49
8458.69 55.390 67.930 4196.51 4269.71 1271.22 N 5750.28 E 6001335.82 N 571699.57 E 5.368 5889.04
-~-----.---
15 March, 2002 - 7:29
Page 4 0'6
DrillQuest 2.00.09.003
Sperry-Sun Drilling Services
Survey Report for MPS-09
Your Ref: API 500292306700
Job No. AKZZ22033, Surveyed: 25 February, 2002
.
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit MPS-Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
8554.46 49.260 66.650 4255.02 4328.22 1300.44 N 5820.18 E 6001365.66 N 571769.21 E 6.487 5963.67
8649.05 46.650 66.170 4318.36 4391.56 1328.54 N 5884.55 E 6001394.33 N 571833.33 E 2.785 6032.66
8742.45 45.900 66.530 4382.92 4456.12 1355.62 N 5946.38 E 6001421.95 N 571894.92 E 0.850 6098.94
8836.97 44.920 65.850 4449.27 4522.4 7 1382.79 N 6007.96 E 6001449.66 N 571956.26 E 1.156 6165.01
8855.07 44.710 65.850 4462.11 4535.31 1388.01 N 6019.60 E 6001454.98 N 571967.85 E 1.160 6177.51 ~
8923.00 44.710 65.850 4510.39 4583.59 1407.56 N 6063.21 E 6001474.92 N 572011.28 E 0.000 6224.36 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.052° (21-Feb-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 77.230° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 8923.00ft.,
The Bottom Hole Displacement is 6224.45ft., in the Direction of 76.930° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
8923.00
4583.59
1407.56 N
6063.21 E
Projected Survey
- -----
-~~-- -- .
15 March, 2002 - 7:29
Page 50f6
DrillQlIest 2.00.09.003
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Survey tool program for MPS-09
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
15 March, 2002 - 7:29
Sperry-Sun Drilling Services
Survey Report for MPS-09
Your Ref: API 500292306700
Job No. AKZZ22033, Surveyed: 25 February, 2002
.
BPXA
MPS-Pad
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
4583.59 AK-6 BP _IFR-AK
~.
8923.00
'-.~
Page 60f6
DrillQuesf 2.00.09.003
)
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-09 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
'MD
(if applicable)
8,923.00' MD
d Od-tOó1 0
)
18-Mar-02
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
t,.~ ~ D I) 0 r:OO?
I ,:"\., L L -
Alaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
MPS-Pad, Slot MPS-09
MPS-09 MWD
-
Job No. AKMW22033, Surveyed: 25 February, 2002
SUR VE Y R E PO R T
15 March, 2002
Your Ref: 500292306700
Surface Coordinates: 6000013.87 N, 565960.74 E (70024' 37.7149· N, 149027'46.4250" W)
Kelly Bushing: 73.200 above Mean Sea Level
55i..--1 ......y-SUI!
ÞAILL.ING SERVices
A Halliburton Company
Survey Ref: svy10081
Sperry-Sun Drilling Services .
Survey Report for MPS-09 MWD
Your Ref: 500292306700
Job No. AKMW22033, Surveyed: 25 February, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit MPS-Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastings Northings Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 GOft)
0.00 0.000 0.000 -73.20 0.00 O.OON O.OOE 6000013.87 N 565960.74 E 0.00 MWD Magnetic
201.85 0.600 272.330 128.65 201.85 0.04 N 1.06W 6000013.90 N . 565959.68 E 0.297 -1.02
292.78 0.650 161.150 219.57 292.77 0.43 8 1.37W 6000013.43 N 565959.38 E 1.135 -1.43
384. 11 2.460 130.190 310.87 384.07 2.188 0.30E 6000011.69 N 565961.06 E 2.115 -0.19
476.50 5.370 139.380 403.03 476.23 6.748 4.63 E 6000007.17 N 565965.43 E 3.212 3.02 '-
565.16 8.090 143.680 491.07 564.27 14.928 11.03 E 5999999.05 N 565971.90 E 3.118 7.46
656.57 11.990 145.870 581.07 654.27 27.97 8 20.17 E 5999986.08 N 565981.15 E 4.286 13.49
747.93 14.500 143.300 669.99 743.19 45.00 8 32.33 E 5999969.16 N 565993.47 E 2.821 21.58
840.91 14.750 139.050 759.96 833.16 63.27 8 47.04 E 5999951.02 N 566008.34 E 1.185 31.90
936.89 16.820 139.060 852.32 925.52 82.99 8 64.15 E 5999931.45 N 566025.62 E 2.157 44.22
1030.16 19.070 141.810 941.04 1014.24 105.168 82.42 E 5999909.44 N 566044.08 E 2.577 57.14
1124.64 19.450 142.740 1030.24 1103.44 129.81 8 101.49 E 5999884.96 N 566063.37 E 0.517 70.28
1217.35 21.370 141.170 1117.12 1190.32 155.26 8 121.42 E 5999859.69 N 566083.53 E 2.153 84.10
1311.79 22.160 142.340 1204.83 1278.03 182.768 143.09 E 5999832.38 N 566105.44 E 0.954 99.16
1406.16 24.110 138.640 1291.61 1364.81 211.328 166.71 E 5999804.03 N 566129.31 E 2.576 115.87
1499.31 26.330 139.590 1375.88 1449.08 241.348 192.68 E 5999774.24 N 566155.54 E 2.422 134.56
1593.69 26.680 139.070 1460.34 1533.54 273.28 8 220.13 E 5999742.54 N 566183.27 E 0.445 154.27
1686.52 29.680 140.330 1542.16 1615.36 306.73 8 248.46 E 5999709.35 N 566211.90 E 3.295 174.51
1781.31 29.850 140.890 1624.44 1697.64 343.108 278.32 E 5999673.25 N 566242.08 E 0.344 195.60
1876.66 33.750 142.420 1705.46 1778.66 382.51 8 309.45 E 5999634.10 N 566273.56 E 4.176 217.25
1968.63 40.270 141.210 1778.87 1852.07 425.98 8 343.69 E 5999590.94 N 566308.18 E 7.133 241.03
2063.56 41.070 137.040 1850.88 1924.08 472.728 384.17 E 5999544.56 N 566349.07 E 2.984 270.18
2156.60 42.140 131.110 1920.48 1993.68 515.638 428.54 E 5999502.05 N 566393.81 E 4.384 303.96
2250.13 43.320 126.180 1989.20 2062.40 555.21 8 478.09 E 5999462.90 N 566443.72 E 3.792 343.54
2343.89 43.270 121.980 2057.45 2130.65 591.228 531.32 E 5999427.36 N 566497.26 E 3.072 387.49
2436.84 43.330 114.830 2125.14 2198.34 621.51 8 587.32 E 5999397.57 N 566553.52 E 5.274 435.41
2524.84 44.170 109.030 2188.73 2261.93 644.198 643.73 E 5999375.39 N 566610.13 E 4.655 485.41
2624.63 44.800 103.590 2259.95 2333.15 663.80 8 710.79 E 5999356.38 N 566677.37 E 3.871 546.49
2717.64 45.400 97.690 2325.64 2398.84 675.93 8 775.49 E 5999344.81 N 566742.17 E 4.538 606.90
2810.99 46.340 91.450 2390.67 2463.87 681.24 8 842.21 E 5999340.10 N 566808.94 E 4.901 670.80
-------.-
15 March, 2002 - 7:29
Page 20f6
DrillQuest 2.00.09.003
Sperry-Sun Drilling Services .
Survey Report for MPS-D9 MWD
Your Ref: 500292306700
Job No. AKMW22033, Surveyed: 25 February, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit MPS-Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
2906.60 47.530 87.370 2455.97 2529.17 680.49 5 912.03 E 5999341.46 N 566878.75 E 3.356 739.06
3001.14 50.560 87.090 2517.93 2591.13 677.045 983.34 E 5999345.54 N 566950.02 E 3.213 809.36
3094.77 52.960 86.640 2575.88 2649.08 673.01 5 1056.76 E 5999350.22 N 567023.40 E 2.591 881.86
3188.95 55.990 84.730 2630.60 2703.80 667.22 5 1133.18 E 5999356.68 N 567099.77 E 3.616 957.67
3284.82 60.440 81.860 2681.09 2754.29 657.665 1214.07 E 5999366.95 N 567180.57 E 5.293 1038.67 -~
3378.67 64.290 79.610 2724.62 2797.82 644.25 S 1296.10 E 5999381.09 N 567262.48 E 4.619 1121.64
3472.59 67.160 76.230 2763.23 2836.43 626.31 5 1379.79 E 5999399.77 N 567346.01 E 4.483 1207.23
3565.76 70.190 72.970 2797.12 2870.32 603.25 5 1463.44 E 5999423.57 N 567429.45 E 4.604 1293.90
3661.68 73.410 68.650 2827.09 2900.29 573.28 5 1549.45 E 5999454.30 N 567515.19 E 5.438 1384.41
3754.94 74.490 66.730 2852.87 2926.07 539.25 5 1632.36 E 5999489.05 N 567597.80 E 2.292 1472.79
3849.45 74.830 65.960 2877.88 2951.08 502.68 5 1715.84 E 5999526.36 N 567680.95 E 0.864 1562.29
3945.28 75.830 66.140 2902.15 2975.35 465.05 5 1800.56 E 5999564.74 N 567765.34 E 1.059 1653.23
4050.96 77.910 66.120 2926.15 2999.35 423.41 5 1894.67 E 5999607.21 N 567859.08 E 1.968 1754.22
4146.43 77.800 66.630 2946.24 3019.44 386.00 5 1980.18 E 5999645.37 N 567944.26 E 0.535 1845.88
4239.26 77.790 66.700 2965.86 3039.06 350.06 5 2063.49 E 5999682.04 N 568027.25 E 0.074 1935.08
4331.39 77.730 66.600 2985.39 3058.59 314.385 2146.16 E 5999718.46 N 568109.59 E 0.124 2023.58
4423.46 74.540 66.660 3007.45 3080.65 278.93 5 2228.20 E 5999754.63 N 568191.32 E 3.465 2111.43
4515.55 73.620 66.570 3032.71 3105.91 243.78 5 2309.48 E 5999790.50 N 568272.29 E 1.003 2198.47
4608.76 73.480 65.880 3059.11 3132.31 207.745 2391.29 E 5999827.26 N 568353.77 E 0.726 2286.22
4702.87 73.770 66.470 3085.64 3158.84 171.275 2473.89 E 5999864.46 N 568436.04 E 0.676 2374.84
4796.22 73.760 66.890 3111.74 3184.94 135.795 2556.19 E 5999900.66 N 568518.03 E 0.432 2462.95
4890.82 74.250 67.090 3137.81 3211.01 100.24 5 2639.90 E 5999936.95 N 568601.42 E 0.556 2552.44
4984.73 74.250 66.510 3163.30 3236.50 64.63 5 2722.97 E 5999973.29 N 568684.17 E 0.594 2641.33
5080.28 74.720 66.420 3188.86 3262.06 27.875 2807.38 E 6000010.79 N 568768.26 E 0.500 2731.78
5176.19 74.430 66.690 3214.37 3287.57 8.91 N 2892.20 E 6000048.33 N 568852.75 E 0.406 2822.63
5271.00 74.100 66.210 3240.08 3313.28 45.38 N 2975.86 E 6000085.53 N 568936.08 E 0.599 2912.28
5364.14 74.390 66.510 3265.37 3338.57 81.32 N 3057.98 E 6000122.19 N 569017.88 E 0.439 3000.31
5457.87 74.380 66.230 3290.60 3363.80 117.50 N 3140.68 E 6000159.11 N 569100.26 E 0.288 3088.97
5552.72 73.400 65.280 3316.92 3390.12 154.92 N 3223.76 E 6000197.26 N 569183.01 E 1.412 3178.27
5645.72 73.240 66.830 3343.61 3416.81 191.08 N 3305.18 E 6000234.13 N 569264.10 E 1.606 3265.66
- --- - ~--- - - ----
- ---.-------
15 March, 2002 - 7:29
Page 30f6
Dril/Quesf 2.00.09.003
. ,. .
. Sperry-Sun Drilling Services' ,- ..,
Survey Report for MPS-09 MWD
Your Ref: 500292306700
Job No. AKMW22033, Surveyed: 25 February, 2002
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit MPS-Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
5741.03 72.830 67.460 3371.42 3444.62 226.48 N 3389.19 E 6000270.28 N 569347.79 E 0.765 3355.42
5833.19 72.500 66.650 3398.88 3472.08 260.78 N 3470.20 E 6000305.29 N 569428.50 E 0.912 3442.01
5926.69 72.320 66.620 3427.14 3500.34 296.13 N 3552.02 E 6000341.36 N 569510.00 E 0.195 3529.61
6019.74 71.640 66.850 3455.92 3529.12 331.08 N 3633.31 E 6000377.02 N 569590.98 E 0.768 3616.62
6116.30 73.480 66.750 3484.86 3558.06 367.37 N 3717.98 E 6000414.06 N 569675.33 E 1.908 3707.21 -
6210.63 73.980 66.360 3511.29 3584.49 403.40 N 3801.05 E 6000450.82 N 569758.08 E 0.662 3796.20
6306.15 73.480 66.290 3538.05 3611.25 440.21 N 3885.03 E 6000488.38 N 569841.73 E 0.528 3886.24
6397.51 73.310 65.640 3564.16 3637.36 475.87 N 3964.99 E 6000524.74 N 569921.37 E 0.707 3972.10
6492.76 73.250 64.720 3591.56 3664.76 514.16 N 4047.78 E 6000563.76 N 570003.82 E 0.927 4061.31
6586.93 73.570 64.740 3618.45 3691.65 552.69 N 4129.40 E 6000603.01 N 570085.09 E 0.340 4149.42
6681.93 73.710 65.040 3645.21 3718.41 591.37 N 4211.94 E 6000642.42 N 570167.29 E 0.337 4238.47
6776.20 73.820 63.630 3671.57 3744.77 630.57 N 4293.51 E 6000682.34 N 570248.52 E 1 .441 4326.70
6871.13 7 -1.260 64.480 3697.67 3770.87 670.50 N 4375.59 E 6000722.99 N 570330.23 E 0.978 4415.56
6966.16 74.890 64.920 3722.94 3796.14 709.65 N 4458.41 E 6000762.87 N 570412.70 E 0.799 4504.99
7060.05 74.670 63.620 3747.59 3820.79 748.98 N 4540.02 E 6000802.92 N 570493.97 E 1.356 4593.27
7155.56 74.860 63.660 3772.69 3845.89 789.90 N 4622.59 E 6000844.56 N 570576.17 E 0.203 4682.85
7248.77 74.830 64.010 3797.06 3870.26 829.57 N 4703.34 E 6000884.95 N 570656.57 E 0.364 4770.37
7342.14 74.490 65.150 3821.76 3894.96 868.22 N 4784.66 E 6000924.31 N 570737.55 E 1.232 4858.22
7431.99 74.030 65.450 3846.14 3919.34 904.36 N 4863.23 E 6000961.14 N 570815.79 E 0.604 4942.84
7530.69 74.140 64.930 3873.20 3946.40 944.19 N 4949.39 E 6001001.73 N 570901.59 E 0.519 5035.67
7619.90 75.270 64.220 3896.73 3969.93 981.13 N 5027.10 E 6001039.36 N 570978.98 E 1.481 5119.62 .-
7711.20 74.800 64.620 3920.31 3993.51 1019.21 N 5106.66 E 6001078.14 N 571058.20 E 0.666 5205.63
7806.58 73.980 64.420 3945.97 4019.17 1058.73 N 5189.58 E 6001118.39 N 571140.77 E 0.883 5295.24
7899.73 71.990 65.160 3973.23 4046.43 1096.67 N 5270.17 E 6001157.04 N 571221.02 E 2.267 5382.22
7992.23 72.330 65.280 4001.57 4074.77 1133.58 N 5350.11 E 6001194.65 N 571300.63 E 0.388 5468.34
8089.02 70.560 65.910 4032.37 4105.57 1171.49 N 5433.67 E 6001233.30 N 571383.85 E 1.930 5558.21
8180.00 67.100 66.750 4065.22 4138.42 1205.55 N 5511.35 E 6001268.05 N 571461.23 E 3.899 5641 .50
8273.59 63.880 66.860 4104.04 4177.24 1239.09 N 5589.62 E 6001302.28 N 571539.19 E 3.442 5725.24
8364.67 60.430 67.380 4146.58 4219.78 1270.40 N 5663.80 E 6001334.24 N 571613.10 E 3.821 5804.51
8458.69 55.390 67.920 4196.51 4269.71 1300.69 N 5737.44 E 6001365.18 N 571686.47 E 5.383 5883.03
. ------ ._-------
15 March, 2002 - 7:29
Page 4 of6
DríllQuest 2.00.09.003
Sperry-Sun Drilling Services
Survey Report for MPS-09 MWD
Your Ref: 500292306700
Job No. AKMW22033, Surveyed: 26 February, 2002
.
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit MPS-Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
8554.46 49.260 66.840 4255.02 4328.22 1329.80 N 5807.39 E 6001394.91 N 571756.16 E 6.463 5957.68
8649.05 46.650 66.640 4318.36 4391.56 1357.54 N 5871.92 E 6001423.22 N 571820.44 E 2.764 6026.75
8742.45 45.900 67.220 4382.92 4456.12 1383.99 N 5934.02 E 6001450.21 N 571882.30 E 0.920 6093.15
8836.97 44.920 65.960 4449.27 4522.47 1410.73 N 5995.79 E 6001477.49 N 571943.84 E 1.406 6159.31
8855.07 44.710 65.760 4462.11 4535.31 1415.94 N 6007.43 E 6001482.81 N 571955.43 E 1.397 6171.81 -'
8923.00 44.710 65.760 4510.39 4583.59 1435.56 N 6051.01 E 6001502.82 N 571998.83 E 0.000 6218.65 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.040° (07-Mar-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section Is from Well and calculated along an Azimuth of 77.230° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 8923.00ft.,
The Bottom Hole Displacement is 6218.96ft., in the Direction of 76.654° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
-.
8923.00
4583.59
1435.56 N
6051.01 E
Projected Survey
- -------~
15 March, 2002 - 7:29
Page 50f6
DrillQuest 2.00.09.003
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Sperry-Sun Drilling Services
Survey Report for MPS-D9 MWD
Your Ref: 500292306700
Job No. AKMW22033, Surveyed: 25 February, 2002
.
BPXA
MPS-Pad
Survey tool program for MPS-09 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
'--
0.00
15 March, 2002 - 7:29
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
8923.00
4583.59 MWD Magnetic
'~
~v
- - --- - . - -- -----
Page 6 of6
DrillQuest 2.00.09.003
MPS-09 (202-020)
)
S'ubject: MPS-09 (202-020)
Date: Wed, 28 May 2003 09:50:29 -0800
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: Matt Green <greenmd@bp.com>
CC: Pat Archey <archeypj@bp.com>
Matt,
I have received the sundry application to squeeze and complete MPS-09 as
well as the daily report and a portion of the bond log that you faxed.
I have also looked at the hard copy of the SCMT log from our file.
It is clear why it is proposed to squeeze between the OA and OB. The
cement map presentation does show that there is cement in place, however
the quality of the cement is not spectacular. The cement map does show
that there is better quality cement above the OA and given the "better"
interval length, it is likely that there is isolation above the OA.
We have discussed that the reasoning for BP not planning a subsequent
bond log was the success you achieved on a similar well out there. I
believe you said the well was S-11. I will finalize your request and
forward for the Commissioner's approval. One condition of the approval
will be that after the well is placed in service, a temperature log or
other evaluation log of BP's choice should be run to verify the
isolation between the sands and above the OA. Given that you are
squeezing the well to give isolation between the sands, I don't believe
that requiring a follow on evaluation log is an undo burden.
Thanks for providing the additional information on this well. Please
call with any questions.
Tom Maunder, PE
AOGCC
A....'.." A.n.N ......1. ............... ........w ............" ..v
.~~-_....._--_......., ..
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of 1
)
5/28/2003 12:28 PM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
')
)
~56~
¡;J~ 5;1z:- ~'
L~ c-"' a
-- z> r::> Z 8' (J~
181 Perforate
181 Other
Run Dual Completion
1. Type of Request: 0 Abandon 0 Suspend 0 Plugging 0 Time Extension
o Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance
o Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of well:
o Development
o Exploratory
o Stratigraphic
181 Service
6. Datum Elevation (DF or KB)
KBE = 73.2'
7. Unit or Property Name
Milne Point Unit
2. Name of Operator
BP Exploration (Alaska) Inc.
4. Location of well at surface
3346' NSL,49' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
4643' NSL, 4286' WEL, SEC. 08, T12N, R11 E, UM
At effective depth"
8. Well Number
MPS-09i
9. Permit Number
202-020
10. API Number
50- 029-23067-00
11. Field and Pool
Milne Point Unit I Schrader Bluff
At total depth
4750' NSL, 4041' WEL, SEC. 08, T12N, R11E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Structural
Conductor
Surface
Intermediate
Production
Liner
8923 feet Plugs (measured)
4584 feet
8828 feet Junk (measured)
4516 feet
Length Size Cemented MD TVD
78' 20" 260 sx Arctic Set (Approx.) 112' 112'
8880' 7" 1461 sx Class 'L', 400 sx Class 'G' 8914' 4577'
Casing
Perforation depth: measured
None
RECEIVED
MAY 2 7 2003
true vertical
Tubing (size, grade, and measured depth) None
Packers and SSSV (type and measured depth) None
Alaska Oil & Gas Cons. Commission
Anchorage
13. Attachments
181 Description Summary of Proposal
o Detailed Operations Program
15. Status of well classifications as:
o Oil 0 Gas 0 Suspended
o BOP Sketch
14. Estimated date for commencing operation
June 2, 2003
16. If proposal was verbally approved
Service Water Injection
Name of approver
Contact Engineer Name/Number: Matt Green, 564-5581
17. ~~;~:y :::~h::at t(J3ga::L;correct to ~~~e be~~~!o~~~~~:I:~~neer
, . '... ,'ConnnlsSlonl:Jse Only
Conditions of Approval: Notify Commission so representative may witness
ß" .\~\'ì ~ \ C. Plug integrity _ BOP Test ~ Location clearance _
~~"'~'?-~~'~ Mechanical Integrity Test ~ Subsequent f~rm required 10- ,",,0'\
O'\C'"~'\a'-.~..:h;\ ~~-.;)\'.~.::::. ~~,~ \~c\c..\\c", "~.. ..
Approved by orœr of the Commission r.KJ /" nf)' "- ~_ .
ForWtili§~F~/15/88 MAY 2 9 ZUUð L LA..-./~\;f '__
Date Approved
Prepared By Name/Number: Sandra Stewman, 564-4750
Date S /2 "2/03
I Approval No. ':) (- '?-; .~ I c.s L\
.~S\:)() ~s\ ""'-,,,\~,,"'- ~a~~-\-
Date 1~~
Submit In TriPKc~te
Commissioner
)
)
MPS-09 Dual Completion
Pre-Rig Work
1. None.
Scope of Work:
1. MIRU Doyon 14.
2. ND Tree. NU BOPE.
3. RIH to TD and displace well to kill weight brine. POH.
4. RIH with perforation guns and EZSV packer.
5. Set packer, perforate 2-ft interval between OA and OB sands, squeeze
10-bbl cement, POH.
6. RIH with bit and scraper. Drill out packer and cement. Clean out well.
POH.
7. Run duaI2.375-in completion as per attached schematic
8. ND BOPE. NU dual 2-1/16" 5M CIW Tree.
9. Freeze protect well
10. RDMO
Tree:Cameron Gen 6 ,
Wellhead:
'J "
I ,
5M
20" 92# ppf, H-40 I 113' I
MPU S-09i
A
) Orig. DF Elev. = 68.00
Orig. GL Elev. = 39.20
KOP @ 400' 0 7" Tam Port Collar I 981'
Max. hole angle = 77.8 deg @4050'
Hole angle thru' perfs = .
7" 26#, L-80, BTRC Casing
. (drift 10 = 6.151, cap.= .0383 bpf)
Perforation Summary
Size Spf
Interval
DATE
03/03/02
REV. BY
MOO
3000' of diesel
11.0# Brine
(TVD)
..
~
COMMENTS
Orilled by Nabors 27-E
Short joints 8478' - 8498'
7" Halliburton Float Collar 8828'
7" Halliburton float shoe
8913'
MILNE POINT UNIT
WELL No.: S-09i
API : 50-029-23067-00
BP EXPLORATION (AK)
Proposed
OA Perfs
8554-
8594' MD
Proposed
OB Perfs
8654-
8684' MD
!?," j
r~
'¡,
~ .!f
: 1
'~
~ ~
'{
'8 "1
t, :I i
~\¡..
-(f 'I ~ . t
~' ~
g
4 t =
" t :!
,~ J!
. 1 I
r
~: ,I 't
.~
I' i
¡ J
~ .~ I
t J
[. ,¡ ,~
¡ ~ I ¡, :<
I', i
. , t
f' t :;
~' i ~,
~ 1
j ri ~
t r "~
t ~ '1
:~~
.:; I:, ~
" "
t ..,
r
~'
t r '1
...~
) )
Proposed MPS-09i dual string completior
20" 92# H-40 WELDED CONDUCTOR @ 113' MD/TVD
7.0-in TAM port collar @ 981-ft
2-3/8" 'X' nipples (set at - 2200' MD)
2-3/8" 4.7# L80 IBT tubing strings
7" X 2-3/8" Baker GT dual packer (set at - 8525' MD)
2-3/8" 4.7# L80 IBT pup jt (-10')
2-3/8" 'X' nipple with 1.875" no-go
2-3/8" 4.7# L80 IBT pup jt (-10')
Re-entry guide
7" X 2-3/8" Baker FH packer (set at -8615' MD)
2-3/8" 4.7# L80 IBT pup jt (-10')
2-3/8" 'X' nipple with 1.875" no-go
2-3/8" 4.7# L80 IBT pup jt (-10')
Re-entry guide
7" 26# L-80 BT&C @ 8913' MD/4578' TVD
2-3/8" Dual Strings with dedicated OA and 08 injection.
') ,
)
'dO) --O·;}-O
MECHANICAL INTEGRITY REPORT'
'...
=?UD DAIE: :)/-';) \-"0 d~'
:. .I G R E L E}.6 S ::;: . .;; I"';) 'is .- t::) "}.
OPER Ex FIELD ,~"V \-,\,\ ",G.. '~fC)~\"- \-
WELL NmiBER \--'\ V ~ - 0<;"\
"""" . '1.\
Casi~g: \
I'D: <G~J') Jill.. '-\S"'ð\-\ TVD; :?BTD: <6"~ MI? '--\5\ ~ TVD
Shoe: «s~\t.\ MD ~S'\\ TVD i DV: N ~ HD ·Tvu
~~ t;LL DATA
~:":1e"!:": N ~ Shoe:
~~ \ r '-.)..' '-(, tt. \---
:\..loi::g: Packe!:'
MD
TVD j :OP:
r·m
:VD
HI)
TVD i Set ê. t
<is <0 S" L\ <is <0 ~ Y ,<J \S
P L ~L.o
erI.5 ~Sç L..{ ~C;-'~ ~ ta Þ-...
\>\C>......,,~ ~'-.)<>-. \ \~~ ~0\C:>~ CO~\<è\\<:>~
C'\I{',,'\~
::ole S:"z e \ "b
ana
~I\
~CF..Þ_NIC;'-L INTEGRITY - PART ¡ 1
Annulus Press Test: :l:.P ¿;2ÒDD; 15 min \~")ç-; 30 min \~"Ç .
Co=en ts : M \ T ~\-\-'N!:.,»(;cJ ~ c:.. k\.)~ k S:..~'-.)<è .... /"de -<J '>
,..-
~~\~~ \~'S\,<!.'d "\-o '-\S(JC)Ç>S\ ~,,\~\-. -\'0 "~ \.~ \<tC!..~Q
MECHlÜ'1ICÞ.~ INTEGRITY - PART /2 . , ~ !\
\~~~ \~~: t~~~'\~c}
Cement Volumes :', Þ..mt. Liner '~~ ; Csg j DV "'-Jp-" .
C¡¡¡t -Jol to cover per~s . ~.... \:..'o\~ ."'::..J¥.-\<..."\t.."'\- \0 C(),-'{t~ ~
o~ 1....C)~"- \' \~~. ~(J() ~ ~ G (c "'i ~ <ö :).. b ~ \~ c.ç- -\.ö:.\ \ W~'I,- ~'-J~~~J
Theore tical Toe (~'f'J'.Ct'" ~t;..cs. c'\,c..\...:J \c 1.. ~~
c .9-"'\ t--.. '::. "'- ,\0...., WJ \- ~ c'ì. t; \C\¿ CL~S1,
Cement Bond Log (Yes or No) ''i'~~ ; In AOGCC File ~<t~
_. .~O~~ \c ~ \. ~ ~~\ M-~~'S.~\\jç:..
CBL !:..valu~t~Q..n7 zone ë.DOVe perfs. <=......,\\(.t..'""'" <:.>.."'" <è"'''', '"i\.-\- ,('.. '-J~\.....
ß<:t..c,\- \;,)c",-'0 '~\':)'Io".'-3) u.~~'.t:k. o·*,.. ~Q..~~':. \\0.\':1 ~<:)~ <"~~o..~.:~ b'i ,-("(\V'Q~\-
R ~ pm~">"-~ -\c.) <;~Q-<ë:~V {c~·'1~C)\C"\.~'\a ~
Proàue-tion Log: Type
Evalu.ation
",v\~,\- -..)~~"" ~.\'\tJ"""~~\-.'c' <;:."-o~(,,;~~\.~- S~ ~ -\0 *
. CONCLUSIONS: Q.<:..: ~~ ~ f-.....~\,{. ~9~ t;) Ie"" -0 ~
? art n: ~s.<.,.'u.'\ ~'> '''~~ ,a.."'"..;) \,,'" \a lox ~'t""\O~<';\:c.:~~
? ar:: : 2: \-1\:C <:.>. ""'-W C"\ b... \, ~ \'( , Ip.r~I? o¡.., "Z.()"~ '" t'tC'\ '\ \ ,\UZ ''-' f\
~'-$(J(<-<L "ro~~ s} .\0\\0"0 \.)1{> '" -.)(j,\~c>' \\c..--. ~ C()KÑ.~cJ
· J{2f'rV)5}ð-'is-05
OS/27/2003 13:51 FAX 907 564 '~f4
BP EXPLORATION
141 001
)
To:
Tom Maunder
Fax:
(907) 276-7542
From:
Matthew Green
Subject:
l\1PS-09 Operations Summary and Cement Bond Log
Tom,
Please find attached a copy of the NIPS-09 operations summary and SCMf log
(26Apr03).
If you require any additional infonnation, please do not hesitate to call.
Cheers,
IIfÁðVl
R""'" ,. '.'" ....C·'..'· E,···",·",,,,, fJ'," b.'I¡;¡''''''''''
. L '.!Ii ~\,'
L""" }! ,',,,,;-,,, ,J ,.~ 1,:,..
Matt
MAY 2 J'
j\J.a 011 & G~ Con1;. Ccmmission
Aochr~
)
141 003
OS/27 /20 0 3 13: 5 4 FAX 907 564 . Q)64
BP EXPLORATION
Legal Well Name: MPS~09
Common Well Name: MPS~09
Event Name: DRILL +COMPLETE
Contractor Name: NABORS ALASKA DRILLING I
Rig Name: NABORS 27E
~~. ~j.~fÃï'f; 1;J I
'f.~;f":~h ":;~':!~~:'.'~~~~'~.~~~ ,!'.~, ~
Start: 20-2~2002
Rig Release: 28-2-2002
Rig Number: 27E
Spud Date: 21-2~2002
End: 28-2-2002
19-2-2002 18:00 - 00:00 P PRE MOVE RIG FROM S-311- TO S-09i - MOVE PIPE SHEDS-
MOTOR MODULE - PUMP MODULE - PIT MODULE - MOVE
SUB MODULE OFF WELL MPS-311
20-2-2002 00:00 - 08:00 8.00 RIGU P PRE FINISH MOVING RIG FROM S-31i TO S-091- WELL TO
WELL IN LINE MOVE - RELEASE TRUCKS AT 0800 HRS
08:00 - 15:00 7.00 RIGU P PRE HOOK UP ALL SERVICE LINES, BUILD BERMS AND SET
CUTTING TANK, GET STEAM TO ALL UNITS
ACCEPT RIG AT 1500 HRS 2/20/2002
15:00 - 20:00 5.00 BOPSUR P INT1 NIPPLE UP 20" DIVERTER SYSTEM WITH 16" LINE -
INSTALL 4" WASH OUT VALVES ON CONDUCTOR PIPE
20:00 - 21 :30 1.50 BOPSUR P INT1 CUT AND SLIP 170' DRILL LINE
21 :30 - 22:00 0.50 BOPSUR P INT1 SERVICE TOP DRIVE
22:00 - 23:00 1.00 BOPSURP INT1 ACTIVATE ACCUMULATOR - FUNCTION DIVETER SYSTEM
- VERIFY DIVERTER OPERATION
23:00 - 00:00 1.00 BOPSURP INT1 PICK UP 5" DRILL PIPE FROM PIPE SHED - DRIFT DRILL
PIPE
21-2-2002 00:00 - 05:00 5.00 BOPSURP INT1 PU 5" DP FROM PIPE SHED ~ RABBIT EACH JOINT
05:00 - 06:00 1.00 BOPSUR? INT1 PREFORM FUNCTION TEST DIVERTER - ACCUMULATOR
TEST WITH AOGCC WITNESS JEFF JONES.
06:00 - 08:00 2.00 BOPSURP INn CON'T PU 5" DP FROM PIPE SHED
08:00 - 08:30 0.50 BOPSURP INn PRE SPUD MEETING
08:30 - 09:00 0.50 BOPSURP INT1 TOP DRIVE SERVICE - RIG SERVICE
09:00 - 11 :30 2.50 DRILL P INn PU BHA - LOAD MWD
11 :30 - 12:00 0.50 DRI LL P INn SURFACE TEST ALL MUD EQUIPMENT
12:00 - 00:00 12.00 DRI LL P INT1 DIRECTIONAL DRILL FROM 112' TO 1099' - SPUD WELL IN
AT 12:00 HRS - WOB 10K TO 25K - RPM 80 - TQ 3K - PP
1150 - GPM 375 - PU 85K - SO 85K - ROT 85K - ECD 9.54
22-2-2002 00:00 - 00:00 24.00 DRILL P INT1 DIRECTIONAL DRILLING - FROM 1099' TO 3637' - WOB 20K
TO 30K - RPM 80 ~ TQ 8K TO 9K - GPM 400 - PP 1450 - ECD
10.1 - PU 120K - SO 105K - ROT 115K
23-2-2002 00:00 - 03:30 3.50 DRILL P INn DIRECTIONAL DRILL FROM 3637' TO 4076' - WOB 20K TO
25K - RPM 100 - TQ 9K TO 10K - GPM 400 - PP 1450 - PU
140K - SO 90 K - ROT 110K - ECO 10.17
03:30 - 05:00 1.50 DRILL P INn CIRCULATE 2 X BU - 6000 STKS - FOR BIT TRIP-
SHAKERS CLEAN
05:00 - 07:30 2.50 DRILL P INT1 PUMP OUT OF HOLE FROM 3919' TO 817' - 100 STKS PER
MIN -1300 PSI- NO PROBLEMS
07:30 - 08:00 0.50 DRILL P INT1 LD 12 JOINTS 5" HEVI-WEIGHT DP
08:00 - 11 :30 3.50 DRILL P INT1 CHANGE BIT'S - DOWN LOAD MWD - CHANGE MOTOR
FROM 1.5 TO 1.22 - UP LOAD MWO - TIH W / BHA - TEST
MWD
11:30-12:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
12:00 - 14:30 2.50 DRILL P INT1 RIH FROM 456' TO 4076' - TIGHT HOLE AT 1700' TO 2000'
WORK THROUGH - REAM THROUGH BRIDGE 1850' TO
1870' - TIGHT TO 1990' - NO OTHER PROBLEMS ON TIH
14:30 - 00:00 9.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4076' TO 5809' - WOB 30K TO
35K - RPM 120 - TQ 10K - GPM 500 - PP 2200 - PU 152K-
SO 80K - ROT 115K - ECD 10.6
24-2-2002 00:00 - 10:00 10.00 DRILL P INT1 DIRECTIONAL DRILL FROM 5809' TO 6815' - WOB 30K TO
40K - RPM 120 - TQ 12K TO 14K - GPM 500 - PP 2450 - ECD
10.22 - PU 170K - SO 100K - ROT 120K
10:00 - 13:00 3.00 DRILL P lNT1 CIRCULATE 14000K STKS FOR WIPER TRIP - STAND
F'~ ' ~L~:;~ -,,~ ~~: ~'~ l~: [', BACK ONE STAND EVERY 30 MINS - ROTATE 120 RPM
, ~t:l g ,\ ~ '
~ . ",:;r ;;":,!",:,r--~ I'è T":- ~1.""r'11i >.',JIftr
Printed: 27-5-2003 2:24:16 PM
M/~Y 2 '{ ¿Llu.
,~J.~~j~ C\1¡ ,~~ t~;:;$ Conf' , C~Hm;:ssion
..,1 :1";~ !~,~.~:~
OS/27/2003 13: 56 FAX 907 564 '<)f4
BP EXPLORATION
)
I4J 004
'":'~';¡,~ìl¡lll'[i;~
~·;!;~¡~~T~:tl0;:!~;IJ:~'i""i!\:~;~j4itff~,¡J~ti!i'î;3
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-09
MPS-09
DRILL +COMPLETE
NABORS ALASKA DRILLING I
NABORS 27E
Start: 20-2-2002
Rig Release: 28-2-2002
Rig Number: 27E
Spud Date: 21-2-2002
End: 28-2-2002
';;r.~·~~'~~~~I'¡;í~~· ,:".:. ~~r~~:~I~..._.,,;¡r.J!.~~.', .:. ~. ,'!~:~..~ '~~~" .~,:/'!~'" .':, .'. '~~{.;..mt: ·~tT~: IUI~;.;·~~·~.:i>'~"':,:;¡,m:!~·,"!1":;_:¡::¡¡ ~'·.1"~,,·,,··:~~~.l,:'':;1;r.ll:1r..'; ,;~~::. ' :':~;;.,: .~::~~.~,; C . .!~~. '..'. ~t' i.;'¡:;- ..~.~ ."...: ,".
. . ~;<~øa.w~~::i~~ mrQ"IÍl:·· t'Øi'·a·jlo.Ots' '..~<ff ai~¿'¥\ I~.ca(íll:)': ,':N~:": ~·;:laf,i'asé:,.~ .i.' t: ~ :.:<~ ·,<,,:e.:'t~:1> ': ;~~,' uÐscqptisrfof <2perattøns;{~r:' .,~;,I~".I ,
'·~'::-'I~,:,.~r~·,l,~~>:,·~;~·~:'{',:<. . -r~:II~;~ ~.Q: I :~,.r.';.~. .,~~·I' '. -·;~r:-··· ''i::E''" , /:':~_.~~.~, ,·,~~,~lf"i'.'"*~~::I~' ,.~~"'!:~1:fi "',:;:~,~.. ...:: ~~. I~-·· :';" \ ,.,.,~'.. _ -:~J". ,,.~~.,' I ,,~~;:: ':·rt.J:"
24-2-2002
10:00 - 13:00
13:00 - 18:30
INT1
INT1
3.00 DRILL P
5.50 DRILL P
18:30 - 19:30 1.00 DRILL P INT1
19:30 - 20:30 1.00 DRILL N RREP INT1
20:30 - 00:00 3.50 DRILL P INn
25-2-2002 00:00 - 00:30 0.50 DRILL P INT1
00:30 - 19:00 18.50 DRilL P INn
19:00 - 23:30 4.50 DRILL P INT1
23:30 - 00:00 0.50 DRILL P INT1
: 26-2-2002 00:00 - 03:30 3.50 DRILL P INT1
03:30 - 04:00 0.50 DRILL P INT1
04:00 - 04:30 0.50 DRILL P INT1
04:30 - 08:30 4.00 DRILL P INn
08:30 - 11 :30 3.00 DRILL P INT1
11:30 -15:30 4.00 DRILL P INT1
15:30 - 18:00 2.50 DRILL P INT1
18:00 - 18:30 0.50 DRILL P INT1
18:30 - 20:00 1.50 CASE P INT1
20:00 - 20:30 0.50 CASE P INT1
20:30 - 00:00 3.50 CASE P INn
27-2-2002 00:00 - 06:30 6.50 CASE P INT1
06:30 - 07:30 1.00 CASE P INn
07:30 - 08:00 0.50 CEMT P INT1
08:00 -10:30 2.50 CEMT P INT1
10:30 -14:00 3.50 CEMT P INT1
AND RECIPROCATE PIPE - 500 GPM
PUMP OUT OF HOLE FROM 6468' TO 456' - WORKED
THROUGH TIGHT SPOTS FROM 2500' TO 1750' PUMPING
OUT - WORKING BACK UP AND DOWN WITHOUT PUMP
ON THE 2ND WIPE ON EACH STAND
LUBRICATE RIG - TOP DRIVE - DRAWWORKS
CHANGE CLUTCH ENGAGE VALVE ON DRAWWORKS -
CHANGE DIES IN TOP DRIVE GRIPPER
RIH FROM 456' TO 6090' - BRIDGE @ 1777' -1817' -1950'-
BACK REAM FROM 1850' TO 1777' - 1955' TO 1932' - CON'T
RIH - NO OTHER PROBLEMS
CON'T RIH FROM 6090' TO 6815'
DIRECTIONAL DRilL FROM 6815' TO 8923' - WOB 30K -
RPM 120 - TQ 14K - GPM 500· PP 2650 - ECD 10.26 - PU
198K - SO 90K - ROT 135K
CBU 4 X FOR WIPER CONDITION TRIP FOR RUNNING 7"
CASING - STAND BACK STAND EVERY 30 MINS WHILE
CIRC - SHAKERS CLEAN
WIPER TRIP - MONITOR WELL - POH FROM 8530' TO 8188'
- TIGHT
ATTEMPT TO WORK THROUGH - BACK REAM FROM 8190'
TO 8140' - CON'T POH - PU WITH OUT PUMP 205 - SO 85
POOH - HOLE IN EXCELLENT SHAPE FROM 8100' NO
PROBLEMS PULL TO 456'
CLEAN RIG FLOOR
RIG SERVICE - TOP DRIVE SERVICE
RIH FROM 456' TO 8923' - TIGHT 7890' - WORK TROUGH -
FILLING EVERY 25 STANDS
CBU 4 X - 24000 STKS - CONDITION MUD TO RUN CASING
-130 STKS - 550 GPM - RPM 120 - ROTATE I ~~
RECIPROCATE STRING WHILE CIRC \.J '"
POH TO RUN CASING FROM 8923' TO 456' BHA. NO
PROBLEMS PULLING OUT OF HOLE.
LAY DOWN BHA - DOWN LOAD MWD
CLEAR - CLEAN FLOOR
RIG UP CASING EQUIPMENT - HOLD SAFETY MEETING
PJSM (ON RUNNING CASING)
PU SHOE JOINT - RUNNING 7" CASING - 55 JOINTS
PICKED UP AT 00:00 HRS
RUNNING 7" CASING - LAND CASING ON HANGER - SO
75K - RAN 215 JOINTS 26# BTC L-80
CIRCULATE AND CONDITION HOLE WITH FRANK'S FILL
UP TOOL AT 80 SPM þ 338 GPM - 300 PSI.
RIGGED DOWN FILL UP TOOL AND RIGGED UP
CEMENTING HEAD WITH WASH UP LINE.
CIRCULATE AND CONDITION HOLE FOR CEMENT JOB. 80
SPM - 338 GPM - 300 PSI.
PUMP 5 BBLS WATER - TEST LINES TO 3500 PSI- PUMP
45 BBLS WATER -PUMPED 50 BBlS OF 10.2 PPG ALPHA
SPACER WITH RED DYE - DROPPED BonOM PLUG WITH
LAST 5 BBLS OF SPACER - MIXED AND PUMPED 1460 SXS
( 1080 BBlS) OF CLASS L CEMENT MIXED IN A 10.7 PPG
SLURRY WITH A YIELD OF 4.15 CFT/SX. PUMPED LEAD
Printed: 27-5-2003 2:24:16 PM
OS/27/2003 13:59 FAX 907 564
)64
BP EXPLORATION
)
141 005
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-09
MPS-09
DRILL +COMPLETE
NABORS ALASKA DRILLING I
NABORS 27E
""..:J~
"'.I\I,¡~"
a¡"''''
.;"~.{-:.
Start: 20-2-2002
Rig Release: 28-2-2002
Rig Number: 27E
Spud Date: 21-2-2002
End: 28-2-2002
1,~~":;~!~;~~1
:~~ J'ljW_:¡t~~"".I..~
" ::¡¡·;;~:2;i!;,~
27-2-2002 10:30 - 14:00
3.50 CEMT P
INTi
14:00 -15:30
1.50 CEMT P
INTi
15:30 -16:00
16:00 - 17:00
17:00 - 00:00
0.50 CEMT P
1,00 CEMT P
7.00 CEMT N
INTi
INTi
SFAL INTi
28-2-2002 00:00 - 02:00
2.00 CASE N
SFAL INTi
02:00 - 03:30
03:30 - 08:00
INTi
INTi
1.50 BOPSUR P
4.50 WHSUR P
08:00 - 11 :00
3.00 WHSUR P
INTi
11 :00 - 20:00 9.00 DRILL P INn
20:00 - 21 :00 1.00 DRILL P INTi
21 :00 - 23:30 2.50 DRILL P INTi
23:30 - 00:00 0.50 DRILL P INTi
CEMENT UNTil LEAD CEMENT WAS SEEN AT SURFACE.
MIXED AND PUMPED 400 SXS (81 BBLS) PREMIUM
CEMENT + 1 % CALCIUM CHLORIDE + .3% HALAD 344 +
.2% CFR-3 MIXED IN AT 15.8 PPG SLURRY WITH A YIELD
OF 1.15 CFT/SX.
WASHED OUT LINES. DROPPED TOP PLUG. DISPLACE
CEMENT WITH 220 BBLS OF 11.0 PPG BRINE AND 116
BBLS OF DIESEL. PUMPED PLUG WITH 2840 PSI (1000 PSI
OVER CIRCULATING) AT 1520 HRS. HAD FULL RETURNS
THROUGHOUT CEMENTING JOB. HAD 419 BBlS OF
CEMENT TO SURFACE.
FLUSHED DIVERTER WITH FRESH WATER.
RIG DOWN CASING EQUIPMENT
ATTEMPT TO BACK OUT LANDING JOINT - RIG UP RIG
TONG FOR BACK UP ON HANGER IN CELLER - RIG UP
POWER TONGS IN CELlER TO ATTEMPT TO BACK OUT
LANDING JOINT - NO SUCCESS - ATTEMPT TO USE RIG
TONG ON FLOOR AND POWER TONGS IN CELLER-
CRUSHED LANDING JOINT ON RIG FLOOR WITH RIG
TONGS
RIG DOWN POWER TONGS ,IN CELLER - RIG UP RIG
TONGS IN CElLER - BACK OUT LANDING JOINT - LAY
DOWN LANDING JOINT - THREADS SEVERL Y GALLED ON
BOTTOM THREADS OF RUNNING TOOL AND HANGER
NIPPLE DOWN DIVERTER
NIPPLE UP GEN 6 WELLHEAD - TEST VOID 1000 PSI. TEST
FAILED. PULLED WELLHEAD AND CHANGED O-RING.
INSTALLED GEN 6 WELLHEAD. TEST VOID TO 1000 PSI
FOR 10 MINUTES. GOOD TEST. INSTALL TUBING HEAD
AND 7" TOP VALVE. RIGGED UP TO TEST.
HELD PJSM ON TESTING CASING AND WELLHEAD.
RIGGED UP HB&R. TESTED WELLHEAD AND CASING TO
4500 PSI FOR 30 MINUTES AND RECORDED ON CHART.
BLED OFF PRESSURE. AND INSTALLED BPV. PRESSURE
TESTED BPV TO 1000 PSI FOR 30 MINUTES AND
RECORDED ON CHART.
HELD PJSM ON lAYING DOWN DRILL PIPE. LAID DOWN 5"
DRILL PIPE FROM DERRICK IN MOUSEHOLE.
UNLOAD 5" DP FROM PIPE SHED
CUT DRLG LINE
SERVICE TOP DRIVE AND RIG - RELEASE RIG AT 23:59
HRS ON 02-28-2002
Printed: 27-5-2003 2:24:16 PM
OS/27 /2003 ~3: 52 FAX 907 56L1 '}64
- n~~
1- ~~¡
~:
J {i-4'
I I :
t :
I ..) ~
I !
~ !~)¡
1 ¡
J t ~
I ·
(.\ ¡
\ :
oS
1 :
, :
I :
Ij i
~¡
.-~} ~
J ~
I I ~
~ ~\ ~
i~ l' 1
~.I':
'.J 1
,,~
I \\ ~
J l ·
I I ~, ~
·K~! ~
(.0 /1 ~
(" :
~ ~', ~
I tf~
I I, ~
I C
I ~
I ,~,
~'-J
I ,;
,. J
"I \ .:'
~ ), ~
1":
\ ~:
, -:
( 1
\ -:
1) -{
'II :
I .
'" I
~ d 1
I. !
W~tEl \ j
....1:,~...~
" ./'Þ>;
r.f.:11~ ~ ;
air. I"'~ ~ C
11..1 fri1 ~
,. ~ I ~
I ~~:
I
~,
:'t
,.
~\.
}
"
íoP
Ir.t ~
I
I
·
I
,
·
·
·
·
·
:-rJ
ia4
\1\'
~
,.¡
.!!.
1"'
~
'-.)
\f)
·
I
·
·
·
f
D
·
,
,~
·
·
·
8600.
i
,.
:Qt
e-t"':
ftt"- ¡ ~ ~
,
"$f
~~
.
: .
: .,
~ . ~
: '
. ,
.
þ
"
I
,.
~
4 ~700
.~. ,
1:' ·
';:: ·
~: ·
~ ·
·
·
·
';:
:.", ·
:.:-", ·
'I
!~
~ L~ (çGmf r¿b~2,)
BP EXPLORATION
l1' (,.
~l~~
i' -...._--
~ . C-
'. >
/~ ( ;'
~ , ~
\ ) ~
" c..
I ( /
,.' I ....,
.....) "
,"'" "\
« « ~
¿ ) ~
.., .... - ....
~.",
~ ~-..
-..; !I \~ -...:. ,"":"
4"".')~"'~~__
~ ~":'
, I r?
< /?
p I \ '
., (' ~
~ < (
'-! '" "'>
't ~/,.'"
)'~ )'-.-
. ...... - .i:'...... I
~~~-
(
"'I
I
,.
~r
c' ~ <
:-;i' ~~ ·
....~('" r
...t'~ --r--:,-,·
",'7 ,
1~¡~--~
f. :::"
;' ~ ....
"'- .-
-.. ,. <..
~(1S\ S
. ~ "
( « ) ,
J I
... 7 :; ')
J \, .......
~ ø~. ~..
- -.-..-::::.~-
... ~_;:__:r.-
\' -- . ",,; -
.Jw..... .-
., .~ ..
" " ~~
I .... <..~--
.;' ì:>
.,; .",.... .-
¿i:\.' - ;, - - -...
- " ,... ,i.....
" "
-. ~ ~
)..J _'_ ..'~
~ l.. ( ......
...~ _ .-J-
....Q- ~:~ -..~-
f..... _
'~ ,,~ c...,
('i''' ~
-' .. " '.'. ',;,' e!."":ft\"~" 0/ - Oq
~?,. . L' "~~ II\" I': .~ 'I: 'I , '. ''-:7
t;( t:JL.11 ~~~. ~ I,! tw L
M
:'~!;:}S~,(} c·¡ l.:on¡;. L,C:ï\rm3SJlJ:
i~X~;~':~·,2.ft':~
141 002
, ':...~
U\
;i
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation COlTIm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 1. 00
Anchorage, Alaska 9950 1
July 30, 2002
RE:MWD Fonnation Evaluation Logs: l\1PS-09,
AK-MW-22033
MPS-09:
Digital Log Images:
50-029-23067 -00
1. CD Rom
a~- O~O
jJLjo;;z
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING mE ATTACHED COPIES
OF mE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Artchorage, Alaska 99518
Date:
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-l
900 E. Benson Blvd.
Anchorage, Alaska 99508
'~
j\~ ~'''''' +""~~ ii;"'....' If¡" ff", ,-~ ""-0<
i'},r . ':~--,~' ì;- ~ \ r! ~ ~ "\~
~ .. ~:om ~.11L..". ~ ,~~I ~ :t.....~~
DEC 1 3 2002
AJa:SKa J;~ 8. Gas Corm. Gc;mrrils..~¡on
¡' ¡,.,
ri.I1C¡ tOŒ:ge
)
)
;:( ()d) -ò èJ. Ò
I09Y7
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
June 20, 2002
RE: MWD Formation Evaluation Logs MPS-09,
AK-MW-22033
1 LIS fonnatted Disc with verification listing.
API#: 50-029-23067-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Speny-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage,AJaska99648
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
Si~ {J.¥
REceIVED
!! 'f I) ,,00.11)
v J ;... i... L 'C.
AfaskaOil & GasCoßS.Gomm~
Anchorase 'NUn
~ilmrn'I~~'[~~
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherrie
.-.
Well
MPS-9 ~~...oao
MPS-31 ô1oa.-o J t.f
MPE-13B ~Od-OYl.f
~.
Job # Log Description
22219 CH EDIT SCMT (PDC)
22218 CH EDIT SCMT (PDC)
22217 CH EDIT SCMT (PDC)
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd. RECEI- V· E··D
Anchorage, Alaska 99519-6612
Date Delivered:
JUN 0 4 2002
Alaska au & Gas Cons.Conurdaaion
A.... .................
Date
04/26/02
04/26/02
04/24/02
5/22/2002
NO. 2095
Company Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Milne Point
CD
1
1
1
Color
2
2
2
Sepia
BL
Schlumberger GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherrie
ReceiVedbY:~~
...<.: t-'ulllng v:::it-' on ~-paa
)
.,
J Subject: Re: Pulling VSP on S-pad
,Date: Tue, 19 Mar 2002 17:06:41 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Campbell, Steve K" <CampbeIS@BP.com>
CC: AOGCC North Slope Office <aogcc_prudhoe_bay@admin.state.ak.us>
Steve,
Thanks for the additional information regarding the VSP surveys. I had some
questions from the inspectors regarding the work. You had described the work in
the original permit to drill applications for the S pad wells. This message
gives further details regarding the operation. It is interesting that there are
individual BOP stacks on the wells. Regardless, the wells are still
unperlorated and will remain so until 4ES completes the wells. You have
approval to proceed with the operations as you describe. I will copy this
message and place it in the respective well files. You do not need to provide a
403 for the operations. Please call if you have any questions.
Tom Maunder, PE
AOGCC
"Campbell, Steve K" wrote:
\ ~ dC)~-Od--D
> Reference wells: MPS-15, 21, 31 & 9
>
> Tom,
>
> In the original permits for the above mentioned wells, I did not include the
> pulling of the VSP from the wells using the Klondike rig which will already
> be over one of the wells waiting on the completion of the surveys. After
> the surveys have been completed the plan is to have the Klondike rig pull
> the VSP from each of the wells leaving the well as it was when the drilling
> rig left it. Nabors 4es will be coming out to run the completions at a
> later date.
>
, > Pr~c~dure for pulling the VSP's:
>
> 1.
> 2.
> 3.
> 4.
> 4.
> 5.
> 6.
>
> Can you give me a verbal to do this work and we could send you a 10403 to
> follow it up for each well?
>
> Thanks for your consideration!
>
> Steve Campbell
> BP Drilling Engineer
> 907-564-4401 (0)
> 907-564-4441 (f)
> campbels@bp.com
Run survey's
Move Klondike rig on to well
Pull VSP from the well
Install BPV
Close master valve and Nipple down thè BOP's
Install tree cap and secure well
Move Klondike rig off
10f2
3/20102 12:31 PM
'1e: t-'ulllng V:::it-' on :::i-pac
;
20f2
)
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
,.
)
3/20/02 12:31 PM
)
~~]~E :'F !A~!A~~~!Æ
ALASKA OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. -pH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
, PO Box 196612
Anchorage AK 99519-6612
Re: Milne Point Unit :MJ>S-09i
BP Exploration (Alaska), Inc
Permit No: 202-020
Sur. Loc. 1934' SNL, 49' WEL, Sec. 12, T12N, R10E, UM
Btmhole Loc. 577' SNL, 4107' WEL, Sec. 08, T12N, RIlE, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Annular disposal has not been requested as part of the Permit to Drill application for Milne Point
Unit MPS-09i.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035;
and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test
before operation, and of the BOPE test performed before drilling below the surface casing shoe,
must be given so that a representative of the Commission may witness the tests. Notice may be
given by contacting the Commission petroleum field inspector on the North Slope pager at
659-3607.
Sincerely,
~1 OuLL ~
camm~chsli Ta;iofJ
Chair
BY ORDER OF THE COMMISSION
DATED thisi&L day of February, 2002
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA \ )AND GAS CONSERVATION COMM. )ION
PERMIT TO DRILL
20 AAC 25.005
1 a. Type of work III Drill 0 Redrill 1 b. Type of well
ORe-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1934' SNL,491 WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
6781 SNL, 4332' WEL, SEq. 08, T12N, R11 E, UM
At total depth
577' SNL, 4107' WEL, SEC. 08, T12N, R11 E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL 375133,4107' MD No Close Approach
16. To be completed for devialed wells
Kick Off Depth 200' Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casinq Weiqht Grade Couplinq LenQth
20" 92# H-40 Welded 801
7" 26# L-80 BTC 88551
Hole
42"
9-7/8"
Wjk.2/</(02-
',) 19, (L\
MVl \1 ,?-rdor
o Exploratory 0 Stratigraphic Test 0 Development Oil
III Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (OF or KB) 10. Field and Pool
Planned KBE = 68.001 Milne Point Unit / Schrader
6. Property Designation Bluff
'7æ:>{D?~ADL 380110
7. Unit or Property Name
Milne Point Unit
8. Well Number
M PS-09i
9. Approximate spud date
02118/02 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 88551 MD 14565' TVD
o 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
75 Maximum surface 1514 psig, At total depth (TVD) 4401'/1947 psig
Setting Depth
Top Bottom
MD TVD MD TVD
Surface Surface 113' 113'
Surface Surface 88551 4565'
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
Quantity of Cement
(include staqe data)
260 sx Arctic Set (Approx.)
950 sx Class IL', 371 sx Class 'GI
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Perforation depth: measured
true vertical
Cemented
MD
TVD
REceiVED
JAN 2 3 ZOO?
Alaska Oil & Gas Con~ Co "
A I ,., mmlsSlon
nCl10rage
20. Attachments III Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch III Drilling Program
a Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer NameINumber: Steve Campbell, 564-4401 James Franks, 564-4468 Prepared By NameINumber: Sondra Stewman, 564-4750
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Pat Archey P 3 ~ck/ Title Senior Drilling Engineer Date 1/2 2../ () ö(
Commission US8Ø1'1ly
Permit ~~ž'-C 2D :ci-I ~U1Pf~ ".2-3D& 7- Öõ ~Xnll o;r ~~::::;~~~i~~ments
Conditions of Approval: Samples Required 0 Yes .&'No Mud Log R'3qui~d 0 Yes l8(No
Hydrogen Sulfide Measures 0 Yes [ljNo Directional Survey Required 'ia:Yes 0 No
Require~ Working Pressu~e for BOPE P 2~ 0 3~ 0 4K ~ 5K 0 1 O~ 0 15K 0 3:5K p~i ~<y CTU . _
Otheft AIl~~ êwM+ gH.4L~~-' - J"q )\e'~í.-t..( ~ d . AoC7(( +0 fA...u. ~S.S- d;,1/4¥'Ý k~-k~Y'- {?> (, !NGI
utlgmM \)IYlí~w DY 't"'-'t \ U by order of ~ J
Approved By Cammy Oechsli 0 R I fQ~~sr. iORer.L the commission Date ~~ { [1 (j ~
Form 10-401 Rev. 12-01-85 lJ . \I /-\ Su mit I Triplicate
') Milne Pr ) MPS-09i Well Permit
IWell Name: I MPS-9i
Drill and Complete Plan Summary
I Type of Well (service / producer / injector): I S-Shaped Water Injector
Surface Location: 19341 FNL, (33451 FSL), 491 FEL, (5230' FWL), SEC. 12, T12N, R10E
X=565,960.74 Y=6,000,013.87
Target Start Location: 6781 FNL, (46011 FSL), 43321 FEL, (9471 FWL), SEC. 8, T12N, R11 E
"OA" X=571 ,722.15 Y=6,001 ,323.22
Target Start Location: 650' FNL, (46281 FSL), 42711 FEL, (10081 FWL), SEC. 08, T12N, R11 E
"08" X=571 ,782.71 Y=6,001,351.27
Bottom Hole Location: 5771 FNL, (47021 FSL), 41071 FEL, (11711 FSL) SEC. 08, T12N, R11 E
X=571 ,945.53 Y=6,001 ,426.68
I AFE Number: 1 TBD I RiQ: I Nabors 27E../' I
I Estimated Start Date: 1 Feb. 18, 20021 I OperatinQ days to complete: 110 I
I MD: 18855 1 I TVD: 14565 1 I Max Inc: 175 1 I KOP: 1200 I I KBE: 168 I
I Well DesiQn (conventional, slimhole, etc.): I Conventional Grass Roots Injector I
1 Objective: I Schrader "OA" & "OB" I
Mud Program:
9-7/8" Production Hole Mud Properties: Spud - LSND Freshwater Mud
Density (ppg) Funnel visc VP HTHP pH API Filtrate LG
Solids
8.6 - 9.20/" 75 - 150 25 - 60 N/A 9.0 - 9.5 < 8 < 6.5
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation .
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D8-4 disposal site./
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR.
Cement Program:
Casin;iSize 17" 261b/ft L-80 BTC Surface casing
Basis 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below
pennafrost
Total Cement
Volume:
Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg
Spacer 50 bþl of Viscosified Spacer (;Ypha Design) weighted to 10.50 ppg
Lead 950 ;.-xs 10.7 lb/gal Class L - 4J~ cuft/sx (cement to surface)
Tail 371 sxs 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at 7750' MD)
Temp I BHST ::::; 80° F from SOR, BHCT 85° F estimated by Halliburton
1
· )
Evaluation Program:
Milne Pt' "' MPS-09i Well Permit
9 7/8" Hole Section:
Open Hole: MWD/GR/RES
Cased Hole: USIT (post rig)
Formation Markers:
Formation Tops MD kb (ft) TVDrkb Pore Pressure Estimated EMW
r (ft) (Psi) (ppg)
Base Permafrost 1933 1822
SVl
Top Ugnu 6102 3559 1569 8.65
Top Ugnu M 8002 4066 1797 8.65
NA 8250 4177 1847 8.65
NB 8306 4207 1861 8.65
NC 8377 4248 1879 8.65
NE 8408 4267 1888 8.65
NF 8473 4308 1906 8.65
Top OA 8521 4340 1921 8.65
Base OA 8590 4386 1941 8.65
Top OB 8612 4401 1948 8.65
Base OB 8655 4430 1961 8.65
TD 8855 4565 2020 8.65
CasingITubing ProQram:
Hole Size Csg/ WtlFt Grade Conn Length Top Bottom
Tbg O.D. MD / TVDrkb MD / TVDrkb
42" 20" 92# H-40 Welded 80' 0' 113' / 113' ý'
9 7/8" 7" 26# L-80 BTC 8855' 0' 8855' / 4565'
Recommended Bit ProQram:
BHA Hole Depth (MD) Bit Type Nozzle/Flow
Size rate
1 97/8" 0' - 6000' MXC-1 3-13 & 1-10
2 97/8 " 6000' - 8855' MXC-l 3-13 & 1-10
2
)
Milne Pf ) MPS-09i Well Permit
Well Control:
· Production hole will be drilled with a diverter.
Surface Interval
· Maximum anticipated BHP:
· Maximum surface pressure:
1947 psi @ 4401' T~rkb - Top of "OB"
1514 psi @ surface
(Based on BHP and a full column of gas from TD @ 0.1 psi/ft)
function test diverter
N/A/
8.6 ppg KCL / 6.8 ppg Diesel
· Planned BOP test pressure:
· Kick tolerance:
. Planned completion fluid:
Drilling Hazards & Contingencies:
Hydrates
· Hydrates have been encountered in the surface holes on other pads, especially nearby H-Pad.
Hydrates generally occur just below the Permafr~1 (+/- 1800 ss) but may be present in
shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas
and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with
DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and Reduce pump rate
while drilling hydrates; Circulate connections thoroughly. See Well Program and
Recommended Practices for specific information.
· Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation If
· Offset wells encountered losses while running and cementing casing and only one well
had losses while running a hole opener. Below is a list of the wells and the lost
circulating problems associated with them. We do not expect losses while drilling this
well.
· H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no
returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job.
· H-05 (1995): Lost returns drilling at 5360 (3700 tvd), 40 bph to keep full, treated w/ LCM pills
for two days, total losses 838 bbls, made hole opener run with some continued losses.
· H-05 (1995): Ran 9-5/8" casing, lost 46 bbls conditioning mud.
· H-07 (1995): Lost 50 bbls running 9-5/8" casing.
· E-24 (1998): Made hole opener run, worked tight spots 1965, 2620, 3465, 5900 and 6000, lost
72 bbls while circulating.
· H-08A (1997): Had some minor losses while running 4-1/2" liner.
· Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while
drilling. Break circulation slowly in all instances and get up to recommended circulating rate
slowly prior to cementing.
3
")
Milne Pi ') MPS-09i Well Permit
Expected Pressures
·
It is unlikely there will be unexpected overprj)'Ssure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.6Síb/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud. This well we be drilled in the undrained portion of the
MPH-07 fault block. Offset injectors that have above normal shut-in pressures will be shut-in
prior to drilling this well. Some of the wells on H-pad have experienced sever gas cut mud well
below the permafrost. Have gas detector installed prior to drilling on S-pad.
Pad Data Sheet
· Please Read the S-Pad Data Sheet thoroughly.
Breathing
· N/A
Hydrocarbons
../
· Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Free Gas maybe
encountered below the Upper Ugnu.
Faults
· 80 - 120' fault at or around the Ugnu to the west. The well plan was designed to stay away
from the fault.
· 20 - 60' fault at or around the Ugnu to the east. The well plan was designed to stay away from
the fault.
Hydrogen Sulfide
· MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
· MPS-9i has no anti-collision issues.
Integrity Testing
.pi'"
...".;"
· MPS-09i will be drilled on diverter and no FIT/LOT is required.
4
')
Milne Pi ) MPS-09i Well Permit
DRILL & COMPLETION PROCEDURE
Drillinq
1. Prior to moving rig onto location, complete a pre-rig inspection with Pad operator. Ensure that
the landing ring has been welded on the 20" conductor and check the height of the conductor
for correct space out for the rig and diverter line.
2. MIRU drilling rig. Conduct spud meeting and HSE compliance briefing with all personnel on
board rig. ,.//
3. Nipple up 21-1/4", 2000 psi diverter system with 16" outlet on existing 20" landing ring. Ensure
diverter setup conforms to diagram posted with AOGCC, and that any flowlines that may be in
the path of the diverter are protected. FUJ),ction test diverter, and record it on the IADC and
morning report. Notify the AOGCC prior to conducting the function test on the diverter and
provide them with a written copy of the test after it is completed.
/
4. PU enough 5" drill pipe to drill to 8.855' MD.
5. PU 9-7/8" MXC-1, Sperry Motor, MWD/GR/Res. Drill 9-7/8" hole to KOP @ ±200' TVD/MD
RKB. Start building angle at 1 °/100' up to 3°/100' with an azimuth of 140° to end of initial build
@ 1.933' MD. 1.822' TVD and 37° as per mud and directional plan and hold. At 2.058' MD.
1.922' TVD begin build and turn at 2.2°/100' until 3. 753'MD. 2.943' TVD, 66.8° azimuth and
74.5° inclination and hold. At 7840' MD. 4.014'TVD start to drop and turn at 4°/100' until
8.521' MD. 4.340 TVD. 47.6° inclination and 65.6° azimuth until and hold until TD.
. 400 - 500 gpm flow rate
6. Make a conditioning trip. Circulate and condition the mud as per mud program for cementing
the 7" casing. Circulate until clean.
7. Rig up 7" casing running equipment. Ensure the cross over with safety valve is on the rig floor
and has been function tested.
8. Run 7" 26#, L-80, BT&C surface casing to total depth. (See "detailed casing section" for
centralizer placement)
9. Circulate and condition the mud as per mud program for cementing the 7" casing. Circulate 1-
1/2" open hole volume.
10. Mix and pump cement as per Halliburton Cement program and ADW recommended practices
(RP) for surface Interval Cementing. Follow the recommended pump schedule to ensure not to
exceeding anticipated formation fracture pressure. Continue reciprocating the pipe as long as
practical. Bump the plug with 1,000 psi over circulating pressure. Check float equipment to
make sure it's holding. Note that the cement will be displaced with KCL and Diesel
for freeze protection. See casing and cement section for details.
11. Nipple down diverter system, pick up and install FMC 20" x 11" 5M Gen 6 wellhead system.
Have FMC service hand on location to supervise installation and testing of wellhead. Test
wellhead system as per FMC.
12. Nipple up 11" x 7-1/16" 5M FMC hold down flange, FMC 7-1/6" 5M gate valve and Tree cap
(with gauge). Rig up HBR. Test wellhead and 7" casing to 4500 psi ~E 30 min on a chart.
13. Install BPV & Secure well.
14. Rig down and release the rig. Complete a post rig inspection with the Pad operator prior to the
rig moving off of the well. Fill out well handover form.
5
)
Milne P~ ') MPS-09i Well Permit
POST RIG
1.
2.
3.
4.
Rig up coil and perform clear¡øut run
Rig up wireline and run US IT
Move in Klondike #1 work platform ./
NU 7-1/16" 5M BOP stack and test blind/shear rams 250 psi low; 4,000 psi high and
test the annular to 250 psi low and 1,000 psi high.
Pull BPV II"
Rig up and run 1-1/2", 2.4ppf, N-80, 10 rd EUE, with Seismic cable and Geophones
strapped to the outside of the tubing to TD.
Land tubing in split bowl on top of the annular.
Install valve in top of 1-1/2" tubing and test same with nitrogen to 90 psi
RD Klondike and support equipment and move off
5.
6.
7.
8.
9.
NOTE: Comø/etion for final injection will be done at a later date and øermitted as reQuired.
6
BP EXPLORA TION
Milne Point Unit
~/askaDrilling & Wells
. ad Qev Working, Slot MP5-09
5-09 - M5-09 Wp04 Pilot
Revised: 18 January, 2002
PROPOSAL REPORT
18 January, 2002
Surface Coordinates: 6000013.87 N, 565960.74 E (70024'37.7149" N, 149027'46.4250" W)
Surface Coordinates relative to Project H Reference: 1000013.87 N, 65960.74 E (Grid)
Surface Coordinates relative to Structure: 42.26 N, 383.90 W (True)
Kelly Bushing: 72.00ft above Mean Sea Level
"'~F"'Y-sL...r1
R8n;..IBIJi·.·....··.."YI:t:;íL"
A kliìiburtm Öiliiif'l'*'i}'
.-.-'
~
Proposal Ref: pro 10043
DrillQuest 2.00.09.008
Page2of8
18 January, 2002 - 17:31
Sperry-Sun Drilling Services
Proposal Report for MPS-D9 - MS-D9 Wp04 Pilot
Revised: 18 January, 2002
BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells
Milne Point Unit MPS-Pad Dev Working
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings m Rœum Section Comment
'¡¡¡it;" aIr:"
(ft) (ft) (ft) (ft) (ft) (ft) (ft) 'il¡lî/100ft)
0.00 0.000 0.000 -72.00 0.00 0.00 N 0.00 E 6000013.äviN. 56599Q~Zft. E 0.00
200.00 0.000 0.000 128.00 200.00 O.OON 0.00 E 6000013.87 N 565900:74 E 0.000 0.00 KOP : Start Dir @ 1.5000/100ft :
200 .OOOMD ,200.0OOTVD
300.00 1.500 140.000 227.99 299.99 1.00 S 0.84 E 6000012.87 N 565961.59 E 1.500 0.60
400.00 3.000 140.000 327.91 399.91 4.01 S 6000009.89 N 565964.14 E 1.500 2.40 --'
500.00 4.500 140.000 427.69 499.69 9.02 S 'f' ijF60()(}ØØ4.92 N 565968.39 E 1.500 5.39 Build Rate - 2.268°/1 o Oft
600.00 6.768 140.000 527.20 599.20 16.54 S 5999997.45 N 565974.76 E 2.268 9.88
700.00 9.035 140.000 626.25 698.25 27.07 S 5999987.00 N 565983.69 E 2.268 16.17
800.00 11 .303 140.000 724.67 796.67 ~t!;~'!; 5999973.58 N 565995.16 E 2.268 24.25
900.00 13.571 140.000 822.32 894.32 57:Ø~¡$¡; 5999957.20 N 566009.15 E 2.268 34.10
1000.00 15.839 140.000 919.03 991 .03 76.54$¡i¡r 5999937.91 N 566025.63 E 2.268 45.71
1100.00 1 8.1 06 140.000 98.90 S 82.98 E 5999915.71 N 566044.59 E 2.268 59.07
1200.00 20.374 140.000 124.14 S 104.16 E 5999890.66 N 566066.00 E 2.268 74.15
1300.00 22.642 140.000 152.22 S 127.73 E 5999862.78 N 566089.81 E 2.268 90.92
1400.00 24.909 140.000 183.10 S 153.64 E 5999832.13 N 566115.99 E 2.268 1 09.37
1500.00 27.177 140.000 216.73 S 181.86 E 5999798.75 N 566144.51 E 2.268 129.46
1600.00 29.445 140.000 1543.49 253.06 S 212.34 E 5999762.69 N 566175.31 E 2.268 151.15
1700.00 31.712 14Q;()()0 1557.58 1629.58 292.03 S 245.04 E 5999724.02 N 566208.35 E 2.268 174.43
1800.00 33,980 '140.000 1641.59 1713.59 333.57 S 279.90 E 5999682.78 N 566243.58 E 2.268 199.25
1900.00 3ß.2~ " 140.000 1723.38 1795.38 377.64 S 316.87 E 5999639.05 N 566280.94 E 2.268 225.56
1933.17 37.000 140.000 1750.00 1822.00 392.79 S 329.59 E 5999624.00 N 566293.79 E 2.268 234.62 End Dir, Start Sail @ 37.000° :
1 933.17ftM D, 1822.0OOTVD
Base Permafrost .- "
2000.00 37.000 140.000 1803.38 1875.38 423.60 S 355.45 E 5999593.42 N 566319.91 E 0.000 253.02
2058.38 37.000 140.000 1850.00 1922.00 450.52 S 378.03 E 5999566.71 N 566342.73 E 0.000 269.10 Begin Dir @ 4.0000/100ft : 2058.38ft
MD, 1922.000 TVD
2100.00 37.150 137.249 1 883.21 1955.21 469.34 S 394.61 E 5999548.03 N 566359.48 E 4.000 281.11
2200.00 37.766 130.748 1962.62 2034.62 511.52 S 438.32 E 5999506.24 N 566403.56 E 4.000 314.42
2300.00 38.727 124.474 2041 .1 9 2113.19 549.23 S 487.33 E 5999468.97 N 566452.90 E 4.000 353.88
DrillQuest 2.00.09.008
Page 30t8
18 January, 2002 - 17:31
Sperry-Sun Drilling Services
Proposal Report tor MPS-09 - MS-D9 Wp04 Pilot
Revised: 18 January, 2002
BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells
Milne Point Unit MPS-Pad Dev Working
Measured Sub-Sea Vertical Local Coordinates Global Coordin~l@§fì¡¡;;;, Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings ,¡;âlštiñtiš¡l¡, RateMw' Section Comment
(ft) (ft) (ft) (ft) (ft) (ft)
.._.-:-,,-:-:-,~~ ;:0
.. "->::;:,,:-" ~::--, :::
.-~., "h
2400.00 40.009 118.498 2118.52 2190.52 582.28 S 541.39 E 5999436.391&, 56651liliiË' 4.000 399.29
2500.00 41 .580 112.866 2194.25 2266.25 610.53 S 600.24 E 5999408.67 N 566566:35 E 4.000 450.44
2600.00 43.41 0 1 07.598 2268.00 2340.00 633.82 S 663.59 E 5999385.94 N 566629.91 E 4.000 507.08
2700.00 45.464 102.694 2339.42 2411.42 652.05 S 731.14E 5999368.31 N 566697.61 E 4.000 568.93
2800.00 47.714 98.139 2408.16 2480.16 665.12 S ߨ2~5~1 E 5999355.86 N 566769.14 E 4.000 635.69 .---
2900.00 50.131 93.910 2473.88 2545.88 672.98 S 5999348.67 N 566844.14 E 4.000 707.03
3000.00 52.691 89.976 2536.26 2608.26 675.58 S 5999346.76 N 566922.25 E 4.000 782.62
3100.00 55.372 86.308 2595.01 2667.01 ô72.91 S 5999350.14 N 567003.08 E 4.000 862.06
3200.00 58.157 82.874 2649.82 2721 .82 5999358.79 N 567086.25 E 4.000 944.99
3300.00 61.028 79.644 2700.44 2772.44 5999372.69 N 567171.34 E 4.000 1031.00
3400.00 63.972 76.590 2746.62 2818.62 633.56 1291.66 E 5999391.74 N 567257.94 E 4.000 1119.67
3500.00 66.977 73.688 2788.13 2860.13 610.21 S 1379.56 E 5999415.87 N 567345.64 E 4.000 1210.56
3600.00 70.033 70.913 2824.77 2896.77 581.90 S 1468.18 E 5999444.96 N 567434.00 E 4.000 1303.24
3700.00 73.130 68.245 -¿S$137 2928.37 548.79 S 1557.06 E 5999478.85 N 567522.59 E 4.000 1397.25
3753.45 74.799 66.855 T2871.14, 2943114 529.17 S 1604.53 E 5999498.89 N 567569.88 E 4.000 1447.88 End Dir, Start Sail @ 74.799° :
3753.45ftMD,2943.14ftTVD
3800.00 74.799 66.855 2955.34 511.51 S 1645.84 E 5999516.91 N 567611.03 E 0.000 1492.07
3900.00 74.799; ., 66~855 2909.56 2981.56 473.58 S 1734.58 E 5999555.62 N 567699.43 E 0.000 1586.99
4000.00 74.799 66.855 2935.78 3007.78 435.65 S 1823.31 E 5999594.34 N 567787.83 E 0.000 1681.92
4100.00 74.799 '·66.855 2962.00 3034.00 397.72 S 1912.04 E 5999633.05 N 567876.22 E 0.000 1776.84
4200.00 74.799 66.855 2988.22 3060.22 359.79 S 2000.78 E 5999671.76 N 567964.62 E 0.000 1871 .76
4300.00 74.799 66.855 3014.44 3086.44 321 .86 S 2089.51 E 5999710.48 N 568053.01 E 0.000 1966.69 ---
4400.00 74.799 66.855 3040.66 3112.66 283.93 S 2178.25 E 5999749.19 N 568141.41 E 0.000 2061.61
4500.00 74.799 66.855 3066.88 3138.88 246.00 S 2266.98 E 5999787.90 N 568229.81 E 0.000 2156.53
4600.00 74.799 66.855 3093.10 3165.10 208.07 S 2355.72 E 5999826.61 N 568318.20 E 0.000 2251.46
4700.00 74.799 66.855 3119.32 3191.32 170.14 S 2444.45 E 5999865.33 N 568406.60 E 0.000 2346.38
4800.00 74.799 66.855 3145.54 3217.54 132.21 S 2533.19 E 5999904.04 N 568495.00 E 0.000 2441.31
4900.00 74.799 66.855 3171.76 3243.76 94.28 S 2621.92 E 5999942.75 N 568583.39 E 0.000 2536.23
5000.00 74.799 66.855 3197.98 3269.98 56.35 S 2710.66 E 5999981.46 N 568671.79 E 0.000 2631.15
5100.00 74.799 66.855 3224.20 3296.20 18.42 S 2799.39 E 6000020.18 N 568760.18 E 0.000 2726.08
5200.00 74.799 66.855 3250.42 3322.42 19.51 N 2888.12 E 6000058.89 N 568848.58 E 0.000 2821 .00
DrillQuest 2.00.09.008
Page 4 ot8
18 January, 2002 - 17:31
Sperry-Sun Drilling Services
Proposal Report for MPS-OS - MS-DS Wp04 Pilot
Revised: 18 January, 2002
BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells
Milne Point Unit M PS-Pad Dev Working
Measured Sub-Sea Vertical Local Coordinates Global Coordinatesiiw", Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings "1'1¡~:~g';i!r, Section Comment
(ft) (ft) (ft) (ft) (ft) (ft)
~- ..-r.-.-~
.--;.;;-- .,-:->:-):.,-,-)
..:-:-:-:-:-:-.-.---~ -.-.-h-.-.-.-'
.,;;,.... ""-_.......
5300.00 74.799 66.855 3276.64 3348.64 57.44 N 2976.86 E 6000097.60iN 5689B,fíj;E' 0.000 2915.92
5400.00 74.799 66.855 3302.86 3374.86 95.37 N 3065.59 E 6000136.31 N 569025:37 E 0.000 3010.85
5500.00 74.799 66.855 3329.08 3401 .08 133.30 N 3154.33 E 6000175.03 N 569113.77 E 0.000 3105.77
5600.00 74.799 66.855 3355.30 3427.30 171.23 N 3243.06 E 6000213.74 N 569202.16 E 0.000 3200.69
5700.00 74.799 66.855 3381.52 3453.52 209.16 N 3331.80 E 6000252.45 N 569290.56 E 0.000 3295.62 ~'
5800.00 74.799 66.855 3407.74 3479.74 247.09 N 3420.53 E 6000291.16 N 569378.96 E 0.000 3390.54
5900.00 74.799 66.855 3433.96 3505.96 285.03 N 3509.27 E 6000329.88 N 569467.35 E 0.000 3485.47
6000.00 74.799 66.855 3460.18 3532.18 322.96 N 3598.00 E 6000368.59 N 569555.75 E 0.000 3580.39
6100.00 74.799 66.855 3486.40 3558.40 36q;§~, ~""'. ",,,.3686.73 E 6000407.30 N 569644.14 E 0.000 3675.31
6102.30 74.799 66.855 3487.00 3559.00 361 :7~¡~~!¡ '\à¡W'3688.78 E 6000408.19 N 569646.18 E 0.000 3677.50 Top Ugnu
6200.00 74.799 66.855 3512.62 3584.62 398.82 N 3775.47 E 6000446.01 N 569732.54 E 0.000 3770.24
6300.00 74.799 66.855 3538.84 3610.84 436.75 N 3864.20 E 6000484.73 N 569820.94 E 0.000 3865.16
6400.00 74.799 66.855 3637.06 474.68 N 3952.94 E 6000523.44 N 569909.33 E 0.000 3960.08
6500.00 74.799 66.855 3663.27 512.61 N 4041.67 E 6000562.15 N 569997.73 E 0.000 4055.01
6600.00 74.799 66.855 3689;49 550.54 N 4130.41 E 6000600.86 N 570086.12 E 0.000 4149.93
6700.00 74.799 66.855 3715.71 588.47 N 4219.14 E 6000639.58 N 570174.52 E 0.000 4244.86
6800.00 74.799' 66:855' 3741.93 626.40 N 4307.88 E 6000678.29 N 570262.92 E 0.000 4339.78
6900.00 74.799< · 66.855 3696.15 3768.15 664.33 N 4396.61 E 6000717.00 N 570351.31 E 0.000 4434.70
7000.00 74..799 66.855 3722.37 3794.37 702.26 N 4485.34 E 6000755.71 N 570439.71 E 0.000 4529.63
7100.00 7.4.799 '66.855 3748.59 3820.59 740.19 N 4574.08 E 6000794.43 N 570528.10 E 0.000 4624.55
7200.00 74.799 66.855 3774.81 3846.81 778.12 N 4662.81 E 6000833.14 N 570616.50 E 0.000 4719.47
7300.00 74.799 66.855 3801.03 3873.03 816.05 N 4751.55 E 6000871.85 N 570704.90 E 0.000 4814.40 .~
7400.00 74.799 66.855 3827.25 3899.25 853.98 N 4840.28 E 6000910.56 N 570793.29 E 0.000 4909.32
7500.00 74.799 66.855 3853.47 3925.47 891.91 N 4929.02 E 6000949.28 N 570881.69 E 0.000 5004.25
7600.00 74.799 66.855 3879.69 3951.69 929.84 N 5017.75 E 6000987.99 N 570970.08 E 0.000 5099.17
7700.00 74.799 66.855 3905.91 3977 .91 967.77 N 5106.49 E 6001026.70 N 571058.48 E 0.000 5194.09
7800.00 74.799 66.855 3932.13 4004.13 1005.70 N 5195.22 E 6001 065.42 N 571146.88 E 0.000 5289.02
7840.62 74.799 66.855 3942.78 4014.78 1021.11 N 5231.26 E 6001081.14 N 571182.78 E 0.000 5327.57 Begin Dir @ 4.0000/100ft : 7840.62ft
MD, 4014.78ft TVD
7900.00 72.426 66.771 3959.53 4031.53 1043.54 N 5283.63 E 6001104.03 N 571234.95 E 4.000 5383.60
8000.00 68.428 66.624 3993.03 4065.03 1080.80 N 5370.15 E 6001142.06 N 571321.13 E 4.000 5476.21
DrillQuest 2.00.09.008
Page 50f8
18 January, 2002 - 17:31
Sperry-Sun Drilling Services
Proposal Report for MPS-OS - MS-DS Wp04 Pilot
Revised: 18 January, 2002
BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells
Milne Point Unit MPS-Pad Dev Working
Measured Sub-Sea Vertical Local Coordinates Global CoordinatM;¡î!ü, Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings ,~ø;_šfingl¡¡¡';;i;;; Rate;;j; Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) Y{lr&{ft)<':tl;,;¡~llf/1 000)
-~.-.---..-h ~_..__._.. .__on
mn ....._....
",-:-:-:-::;-:-:-:-: -:-,-:-:,-"-
. .........
m_..._ .._m
".:-,-:-,-:-:-:-:;-, _.x:.:-:-:-:-:-:-:-
8002.64 68.323 66.620 3994.00 4066.00 1081.77 N 5372.40 E 6001 5713iitlø¡e 4.000 5478.62 Top Ugnu M
8100.00 64.431 66.468 4033.01 4105.01 1117.27 N 5454.21 E 6001179.27 N 571404:87 E 4.000 5566.26
8200.00 60.433 66.302 4079.28 4151.28 1152.77 N 5535.42 E 6001215.49 N 571485.76 E 4.000 5653.31
8250.56 58.412 66.213 4105.00 4177.00 1170.30N 5575.27 E 6001233.36 N 571525.46 E 4.000 5696.05 Schrader NA
8300.00 56.436 66.122 4131.62 4203.62 1187.13 N 5613.37 E 6001250.53 N 571563.41 E 4.000 5736.93 ~
8306.10 56.192 66.111 4135.00 4207.00 1189.19 N 5618.02 E 6001252.63 N 571568.03 E 4.000 5741.91 Schrader NB
8377.19 53.351 65.972 4176.00 4248.00 1212.76¡N 5671.07 E 6001276.67 N 571620.88 E 4.000 5798.87 Schrader NC
8400.00 52.439 65.925 4189.76 4261.76 ~~.~,r.;¡ 5687.69 E 6001284.23 N 571637.43 E 4.000 5816.71
8408.56 52.097 65.907 4195.00 4267.00 ·.."""',4<,,5693.87 E 6001287.05 N 571643.59 E 4.000 5823.35 Sch rader N E
8473.44 49.505 65.766 4236.00 4308.00 124:f5~!~!f:;;; ·~'5739.74 E 6001308.03 N 571689.27 E 4.000 5872.63 Schrader NF
8500.00 48.443 65.705 4253.44 4325.44 1251.75 N 5758.01 E 6001316.43 N 571707.47 E 4.000 5892.27
8521.77 47.573 65.654 4268.00 4340.00 1258.42 N 5772.75 E 6001323.22 N 571722.15 E 4.000 5908.12 End Dir, Start Sail @ 47.573° :
8521.77ftMD,4340.0OftTVD
TSBD-OA
Target - MPS-09 T1 Top OA
8589.95 47.573 65~6?:t ····4314:00 4386.00 1279.17N 5818.60 E 6001344.37 N 571767.82 E 0.000 5957.42 TSBC (base OA)
8600.00 47.573 65:654, ~.?O~¡;ª{ 4392.78 1282.22 N 5825.36 E 6001347.49 N 571774.55 E 0.000 5964.69
8612.19 47.573 651654 4329:00 4401.00 1285.93 N 5833.55 E 6001351.27 N 571782.71 E 0.000 5973.50 Hold Angle = 47.573
TSBB-OB
Target - MPS-09 T2 Top OB
8655.17 47:573 65.654 4358.00 4430.00 1299.01 N 5862.46 E 6001364.61 N 571811.50 E 0.000 6004.59 SBA5 (base OB)
8700.00 47.573 65.654 4388.24 4460.24 1312.65 N 5892.61 E 6001378.51 N 571841.53 E 0.000 6037.00
8800.00 47.573 65.654 4455.71 4527.71 1343.08 N 5959.86 E 6001409.54 N 571908.50 E 0.000 6109.31 -- "
8855.27 47.573 65.654 4493.00 4565.00 1359.90 N 5997.03 E 6001426.68 N 571945.53 E 0.000 6149.28 Target - MPS-09 TD
8900.00 47.573 65.654 4523.17 4595.17 1373.51 N 6027.11 E 6001440.56 N 571975.48 E 0.000 6181.63
8962.00 47.573 65.654 4565.00 4637.00 1392.38 N 6068.80 E 6001459.79N 572017.01E 0.000 6226.46 Total Depth:
8962.00ftM D ,4637 .0OftTVD
7" Casing
DrillQuest 2.00.09.008
,-,0
~.
Alaska Drilling & Wells
MPS-Pad Dev Working
Page 60f8
Begin Dir @ 4.0000/100ft : 7840.62ft MD, 4014.78ft TVD
End Dir, Start Sail @ 47.573° : 8521.77ftMD,4340.00ftTVD
Hold Angle = 47.573
Total Depth: 8962.0OOMD,4637.0OOTVD
KOP : Start Dir @ 1.500°/1000: 200.0OOMD,200.00ftTVD
Build Rate - 2.268°/1000
End Dir, Start Sail @ 37.000°: 1933.17ftMD,1822.00ftTVD
Begin Dir @ 4.0000/100ft: 2058.38ft MD, 1922.000 TVD
End Dir, Start Sail @ 74.799° : 3753.45ftMD,2943.14ftTVD
5231.26 E
5772.75 E
5833.56 E
6068.80 E
1258.42 N
1285.93 N
1392.38 N
',4014.18
A340.00
'44ö1.00·
4637:00
200.00
499.69
1822.00
1922.00
2943.14'
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
18 January, 2002 -17:31
7840.62
8521.77'
8612.19
8962.00
200.00
500.00
1933.17
2058.38
3753.45
Measured
Depth
(ft)
Comments
Based upon Minimum Curvature type calculations, at a Measured Depth of 8962.00ft.,
The Bottom Hole Displacement is 6226.48ft., in the Direction of 77.078° (True).
0.00 E
7.57E
329.59 E
"'378.03 E
1604.54 E
0.00 N
9.02 S
392;:79 S
450.52 S
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 77.230° (True).
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Sperry-Sun Drilling Services
Proposal Report for MPS-09 - MS-D9 Wp04 Pilot
Revised: 18 January, 2002
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
DrillQuest 2.00.09.008
---'
.---
Alaska Drilling & Wells
MPS-Pad Dev Working
Page 70f8
18 January, 2002 - 17:31
1750.00 0.000 0.000 1933.17 1822.00 1750.00 392.79 S ,/6?~Ë2~.i§¡¡ Base Permafrost
3487.00 0.000 0.000 6102.30 3559.00 3487.00 361.76 N d¡"rlaS8S¡ragiE· Top Ugnu
3994.00 0.000 0.000 8002.64 4066.00 3994.00 1081.77 N 5372.40 E Top Ugnu M
4105.00 0.000 0.000 8250.56 4177.00 4105.00 1170.30 N 5575.27 E Schrader NA
4135.00 0.000 0.000 8306.10 4207.00 4135.00 1189.19N 5618.02 E Schrader NB
4176.00 0.000 0.000 8377.19 4248.00 4176.00 5671.07 E Schrader NC
4195.00 0.000 0.000 8408.56 4267.00 4195.00 5693.87 E Schrader NE
4236.00 0.000 0.000 8473.44 4308.00 42~.00 5739.74 E Schrader NF
4268.00 0.000 0.000 8521.77 4340.00 42~~.00 5772.75 E TSBD-OA
4314.00 0.000 0.000 4386.00 43;f~.00 5818.60 E TSBC (base OA)
4329.00 0.000 4401.00 4329.00 1285.93 N 5833.55 E TSBB-OB
4358.00 0.000 4430.00 4358.00 1299.01 N 5862.46 E SBA5 (base OB)
Casing details
F' rorn To
Measured. Vertical Measured Vertical
Depth Depth Depth Depth Casing Detail
(ft) (ft) (ft) (ft)
<Surface> <Surface> 8962.00 4637.00 7" Casing
Penetration Point
Sub-5ea
Depth Northings
(ft) (ft)
Profile
Measured Vertical
Depth Depth
(ft) (ft)
Formati on Plane
(Below Well Origin)
Sub-Sea Dip Dip Dir.
(ft) Deg. Deg.
Formation Tops
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Sperry-Sun Drilling Services
Proposal Report for MPS-09 - MS-09 Wp04 Pilot
Revised: 18 January, 2002
DrillQuest 2.00.09.008
Page 80(8
18 January, 2002 - 17:31
T a £;9;e t
TVD fir!'!:!¡!!;';, No.!.?~ Eastings Target Target
(ft) (ft'" (ft) Shape Type
4340.00 1258.42 N 5772.75 E Polygon
Mean Sea Level/Global Cooidfnates: 4268.00 6001323.22 N 571722.15 E '~
Geographical Coordinates: 700 24' 50.0704" N 149024' 57.1769" W
oint #1 4340.00 1116.56 N 5749.97 E
#2 4340.00 1112.15N 6249.95 E
#3 4340.00 1612.13 N 6254.36 E
#4 4340.00 1616.54N 5754.38 E
Mean Sea Level/Global Coordinates #1 4268.00 6001181.17N 571700.62 E
#2 4268.00 6001181.17 N 572200.62 E
#3 4268.00 6001681.17 N 572200.62 E
#4 4268.00 6001681.17 N 571700.62 E
Geographical Coordinates #1 700 24' 48.6754" N 1490 24' 57.8480" W
#2 700 24' 48.6280" N 149024'43.1898" W
#3 700 24' 53.5456" N 1490 24' 43.0480" W
#4 700 24' 53.5930" N 1490 24' 57.7073" W
4340.00 1258.42 N 5772.75 E Point
Mean Sea Level/Global Coordinates: 4268.00 6001323.22 N 571722.15 E
Geographical Coordinates: 700 24' 50.0704" N 149024' 57.1769" W '-'
4401.00 1285.93 N 5833.55 E Point
Mean Sea Level/Global Coordinates: 4329.00 6001351.27 N 571782.71 E
Geographical Coordinates: 700 24' 50.3406" N 1490 24' 55.3935" W
4565.00 1359.90 N 5997.03 E Point
Mean Sea Level/Global Coordinates: 4493.00 6001426.68N 571945.53E
Geographical Coordinates: 700 24' 51.0669" N 1490 24' 50.5989" W
MPS-09 TO
MPS-09 T2 Top OB
MPS-09
MPS-09 Geo-Poly
Target
Name
Alaska Drilling & Wells
MPS-Pad Dev Working
Targets associated with this well path
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Sperry-Sun Drilling Services
Proposal Report for MPS-OS - MS-DS Wp04 Pilot
Revised: 18 January, 2002
Sper. ì-Sun Drilling 56. 'Vices
Proposal Data - MPS-06 Slot 09 - MS-09 Wp04 Pilot
MD Delta Inclin. Azimuth TVD Northings Eastings Dogleg A. Build Toolface VS (770)
(ft) MD (ft) (D) (D) (ft) (ft) (ft) (0/100ft). (0/100ft) (0) (ft)
-"""1'-::. .::..::::: '::'Ò~'6~I~~::::-':===:~ ········á~()~~ .~=:_._~~~ª~."... .. __ ...~~~~·=~·:·=·~:··:ª~·~~L~:·~:·.···:··:·~-;~§~:~-~~~:~.~===[:====~-==:~:::===:==:~~:::=:=~~~:
L ._?__.. ..?o.o.~~ ._....._?~~.Q~... 0:090... ....... .....~.:.~9.. _.__?P~:.'?Q___.___......~~~_._._....._~.o~._~_~:~~_..._~.000 .._~.o~__.. o.o~
~,____!_._ .~~~·.~~___.....~~~.:.9~... ... 4...5g~........~ ~o.ooo ".......__~.~~~.~_~_._~~?_~~.,?~~~_.~_____.__~ .5~.~_._.J~~~.___~~~~00 ~_.__?39
.---.~-. ;~~~};-·-···~··~·~·:i~--j~ ~:---+:~:~6R:~i:~-..--¡~5:~~-~T,,--i~~6H···~::::::~~~ªª~;··-·-~:6*-~~~5H~::~d
6 3753.45 1695.07 74.799 66.855 2943.14 529.17 S 1604.53 E 4.000 2230 274.067 1447.88
7 7840.62 4087.17 74.799 66.855 4014.78 1021.11 N . 5231.26 E 0.000 0.000 0.000 5327.57
8T 8521.77 681.15 47.573 65.654 4340.00 1258.42 N 5772.75 E 4.000 -3.997 181.938 5908.12
9T 8612.19 90.42 47.5731 65.654..~~9_~P~1._~~~~:.~3_N~..._5.8~~:5~ ,E 0.0001 0.000 0.000 5973.50
~.. ~_ºT.._......~.~§?:g~.... ..... ~~.~:.~~ ...._...~T.~!.~.:.......... .~~:.§~_~. u~§~?:~e>.:", ~_~~2.~8}~ ._. ~_0.68.~o..5. . .......... ..9:.9.~.;..............._9.:9P.9... .__..p..:~~. ..._"""_.__§?.g~:~.
18 January, 2002 - 15:32
- 1 -
DrillQuest
-r-- l.~Y-!!!ILIl BPXA
l.nULLIH-aJ, AJLhVIL)d Milne Point Unit
II. i¡"""'" ~lrt
1600 -
800 -
Q)
~
II)
en
c:
:c
t
0
Z
0
g
0
OJ
II
.J::.
0
.£;
ió
(ij
0
II)
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
. ~ _. .... ^^ n.... ^^^
Scale: 1 inch = 800ft
o
o
Scale: 1 inch = 800ft
Wel:
Horizonlal Coordinates:
Ref. Global Coordinates:
Ref. Structure:
Ref. Geographical Coordinates:
RKB Elevation:
North Refererce :
Units:
MPS-Pad
MPS-09 WP-04
DrillQuest"
800
I
2400
I
Eastings (Well)
3200
I
6400
I
4000
I
4800
I
5600
I
1600
I
t,,~P£~G..9 T~ T 0P GA
~~,~~_~:it~~.;. 12S8A2 N. 5??2.75 E T~i1g-
l
- 1600
MPS·G9 T2 Top GS
Po1nt T~:u.Gt
44(n "DO TVD. :2?~S_~:3 N.. 523:i ¿-is E
.Ã Total Depth: 8965.OOfIMD,4637.00.OOfIlVD
:'> ¡ f~1:P.S··09 GB~·P~;'l
. S~~~:g, Sides: SÔO.i)01t
¡ ,i340.tYJ T'.:D. -;258.42 N. f-~772]5 E
egin Dir @ 4.000'/10011 : 7840.6211 MD, 4014.78f1lVD
- 800
Q)
~
II)
en
c:
:c
t
o
Z
~
MPS·O~ TD
P')Er:t T arget
45~&_C...,,} 1'lO. 1359.90 N. 5Ç97.03 E
o
è5
o
OJ
II
.J::.
o
.£;
2700.1\
ió
(ij
o
en
rod Dir, Start Sail @ 74.799': 3753.45f1MD,2943.14f1lVD
I
800
I
1600
I
6400
Reference is True North
I
2400
I
3200
Eastings (Well)
I
4000
I
4800
I
5600
Current Well Properties
MPS-09 Wp-04 Draft
6000013.87 N, 565960.74 E
42.26 N, 383.90 W
70° 24' 37.7149' N, 149° 27' 46.4250' W
Measurement Units:
Single Well Target Data for MPS-09
ft
Coordinate
Point TVD SSTVD Northings Eastings ASP-4 Northings ASp·4 Eastings
Type
Entry Point 4364.30 4292.30 1280.48 N 5785.79 E 6001345.40 N 571735'<JO E
Entry Point 4414.80 4342.80 1292.15 N 5846.50E 6001357.00 N 571795.ooE
Entry Point 4586.40 4514.40 1333.06 N 0026.77 E 6001400.10 N 571975.50 E
Entry Point 4359.00 4287.00 1022.12N 4648.47 E 6001077.00 N 570600.00 E
Entry Point 4414.80 4342.80 1292.15 N 5846.50 E 6001357.00 N 571795.ooE
Entry Point 4340.00 4268.00 1258.42 N 5772.75 E 6001323.22 N 571722.15 E
Boundary Point A 4340.00 4268.00 1116.56 N 5749.97 E 6001181.17 N 571700.62 E
B 4340.00 4268.00 1112.15 N 6249.95 E 6001181.17 N 572200.62 E
C 4340.00 4268.00 1612.13 N 6254.36 E 6001681.17 N 572200.62 E
D 4340.00 4268.00 1616.54 N 5754.38 E 6001681.17 N 571 700.62 E
Entry Point 4340.00 4268.00 1258.42 N 5772.75 E 6001323.22 N 571722.15 E
Entry Point 4401.00 4329.00 1285.93 N 5833.55 E 6001351.27 N 571782.71 E
Point
72.0011 above Mean Sea level
72.001I above Strucllre
Target
Name
Target
Shape
-'
True North
Feet (US)
1IT1
1TI2
Point
Point
Proposal Data for MS-09 Wp04 Pilot
Point
Well
Well
ft
True North
O.IXJO
O.IXJO
4.500
37.1XJO
37.1XJO
74.799
74.799
47.573
47.573
47.573
O.IXJO
O.IXJO
14O.1XJO
14O.1XJO
14O.1XJO
66.855
66.855
65.654
65.654
65.654
Dogleg seventy: Degrees per 100 feet (US)
Verllcal Section Azirruth : 77 .230°
Vertical Section Description:Wel
Vertical Section Origin: 0.00 N,O.DO E
Measured Incl. Azlm.
Depth
0.00
200.00
500.00
1933.17
2058.38
3753.45
7840.62
8521.77
8612.19
8962.00
Vertical
Depth
0.00
200.00
499.69
1822.00
1922.00
2943. J 4
4014.78
4340.00
4401.00
4637.00
1IT3
Point
MPS-06 Pilot
MPS-06 TI
Point
MPS-09 Goo-Poly
Polygon
Northlngs Eastings Vertical Dogleg
Section Rate
O.OON O.OOE 0.00 MPS-09 TI Top OA
O.OON O.OOE 0.00 O.IXJO
9.02S 7.57E 5.39 1.500 MPS-09 1"2 Top OB
392.79 S 329.59 E 234.62 2.268
450.52 S 378.03 E 269.10 O.IXJO
529.17 S 1604.53 E 1447.88 4.1XJO
1021.11 N 5231.26 E 5327.57 O.IXJO
J 258.42 N 5772.75 E 5908.12 4.1XJO
J 285.93 N 5833.55 E 5973.50 O.IXJO
1392.38 N 6068.80 E 6149.28 0.001
Point
-I -, '"."Y'-!5f..I1 BPXA
j,)AJL.LINIiII ...."..,h..~s Milne Point Unit
... ti;t_~ ç.,.o......(
Q)
~
.c
ã.
()
~ 2400 -
cO
()
t
()
>
.:::
o
o
ex>
II
£.
o
.S
å)
(ij
o
en 4800 -
~-"II_..__~'" 1'\"',..'" ....^^
Scale: 1 inch = 800ft
o
Vertical Section (Well)
3200
I
4800
I
4000
I
1600
I
2400
I
800
I
o
/OP: Start Dir@ 1.500'/10011: 2oo.OOIIMD,2oo.OOIITVD
increase BLiId Rate" 2.268'/10011
¡OOoo
800 -
I 000.00
1500.00
1 600 -
\ ~nd Dir, Start sail@37.ooo':1933.17I1MD.,1822.OOIITVD
(. .Æegin Dir @ 4.000'/10011 : 2058.3811 MD. 1922.001I TVD
.00
1I..I,r !'~r!"!Jf·.,I:
3200 -
nd Dir, Start Sail @ 74.799' : 3753.45I1MD,2943.14I1TVD
r",:~(~;.~~:,
MPS-Pad
MPS-09
DrillQuest~
Section Azimuth: 77.230° (True North)
5600 6400
I I
o
- 800
---
- 1600
Q)
~
.c
ã.
()
- 2400 ~
cO
()
t
()
>
- 3200
Begin Dir @ 4.000'/1001I : 7840.6211 MD, 4014.7811 TVD
.--
End Dir, Start Sail @ 47.573': 8521.77I1MD,434O OOIITYJ
H?S·()9 T' Top ÜiI. 00 / - 4000
1-340.00 Tvû. :~<:5ÚA2 N. -S?f'2J5 E ~ /
S'1"a,.". SidBs: 50();,~:~.",-..¡ íL" ,",' ~)B "-'.. ~":,... í" Id Angie ; 47.573 g
é "1< ~~ r"" < "3- ."".. -A-- -<; . '~.O?""'" ex>
-S~~~r~-' B ;:s. {¿~~;; ;~t ~ ~~-~~ ~'- ;:'~ - ~,.¡ ~
~~:11~ Z~;~ ~5~; ;~tN "<'Q7 (>3 c~ 7' C~ .~
å)
(ij
o
~ 4800 en
4000 - "f',}> {:~;. ;J~
.':.·,··.:.,....s-\
4,",£;11 S(1;;ø,!.õ,\ß
.,...·I¡(¡."";.....t.i..,....·t·
4J4Ã:;:J
<o;..!~",.!'r.\"f
':l!'!J.lJf
~'>F~: (I':!;.:/:.;;) 7"5~;:~:,-~¡ .~!MJ ~¡...~;:~::~,
o
Scale: 1 inch = 800ft
I
800
I
4800
I
1600
I
2400
I
3200
Vertical Section (Well)
I
4000
Total Depth: 8962.OOIIMD,4637.OOIITVD
I
5600 6400
Section Azimuth: 77.230° (True North)
,,',j . ,...
~'; ~;"
Field: Milne Point
Well: S-09i
DIRECTIONAL
LWD
OPEN HOLE
LOGGING
NONE
NONE
MWD/GR/RES
IFR/CAS
1/22/2002
FORM
250 % Excess
Base of Permafrost
40 % Excess
Top of Tail Cement
Top of N sand
OA sand
OB sand
Total Depth
)
BP EXPLORATION
Milne Point Unit MPS-09i
Actual Surface Location: 3345' FSL & 49' FEL
Bottom Hole Location: 4702' FSL & 4107' FEL
Status: not drilled
DEPTH
MD I TVD
110'
1,933' 1,750'
7,750' vi'
8,250' 4,177'
8,521' 4,340'
8,216' 4,401'
8,855' 4,565'
110'
HOLE
SIZE
97/8"
MXC-1
)
ENG: Steve Campbell
RIG: Nabors 27E
RKB: 68'
CASING
SPECS
MUD INFO
PIT INFO
42
20" 92# H-40
Welded
Insulated
Lead Cement
Volume ./
702.9 bbls
950 Sacks
Tail Cement
Volume /
76.0 bbls.....
371 Sacks
Production
Casing
7"
26# L-80
BT&C
MW = 9.2
INFORMATION
Wellhead
FMC Gen 6 20" x 11" 5M
KOP @ 200'
EOB @3753'
AA';;75
VS=1447'
SOD @ 7840'
EOD @ 8521'
AA=48
VS=5908'
MPS-9i well plan schematic.xls
').
J
')
H 202458
DATE
12/07/01
CHECK NO.
00202458
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
100.00
VENDOR ALASKAO I LA
DISCOUNT NET
100.00
00
120501 CK120501H
PYMT COMMENTS:
HANDLING INST:
Pernit to Drill ~ee
S/H - Terrie Hub)le X4628
-"-yY\ps- 09 '
R~CE'VED
~)rAN 2 3
I 2002
AlaSka Oil & G ~
aSCons C .
Anchorag~ ommlssion
tE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
100.00
100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAG E, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFIUATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No. H 202458
CONSOLIDATED COMMERCIAL ACCOUNT
56·389
"""4"12
00202458
PAY ONE HUNDRED & 00/100************************************* US DOLLAR
DATE
12/07/01
AMOUNT
$100.00
To The
ORDER
Of
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE AK 99501
NOT VALID AFTER 120 DAYS
n""
\ (..-J f?~!J.-...
III 2 0 2 L, 5 8 III I: 0 l. ~ 2 0 3 8 ~ 5 I: 0 0 a ........ ~ ~ III
'~i~
"
J
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERJPARAGRAPHS TO
BE INCLUDED IN TRANSlVllTTAL LETTER
;7/¡:J¿¿ ~-~~
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
DEVELOPMENT
REDRJLL
EXPLORA TION
INJECTI7
INJECTION WELL
RED RILL
WELL NAME
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
ANNULAR DISPOSAL
~o
ANNULAR DISPOSAL
<--> YES
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a Dew wellbore segment of existing weD
~ Permit No, ,API No. '
Production should continue to be reported as a function of
the original API number stated above. '
In accordance with 2,0 AAC 25.005(1), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for wel~ (n8:me on permit).
Annular disposal has ~ot been requested. . .
Annular Disposal, of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. '. .
ANNULUS
<--> YES +
SP ACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved' ,sùbject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
/J? P«. /'
COMPANY~)C WELL NAME 6 -7" PROGRAM: exp _ dev ~ redrll _ serv ~ wellbore seg _ann. disposal para req _
INIT CLASS ~cR I ¿¿,;/AJ,J GEOL AREA gqD UNIT# 0/ / 3~ ON/OFF SHORE 01'1
Y N
Y N
1. Permit fee attached. . . . . . . '.' . ~:¡..¡"" . . . .L/o. .
2. Lease number appropriate.:¥ 5u ¡e:t. . ! . I'~ .¡.Ii? ~ . ! .
3. Unique well name and number. .. . . . . . . . . . . . . . . .
4. Well located in a defined pool.. . . . . . . . . . . . . . . . .
5. Well located proper distance from drilling unit boundary.
6. Well located proper distance from other wells.. .
7. Sufficient acreage available' in drilling unit.. . . . . . . .
8. If deviated, is wellbóre plat induded.. . . . . . . . . . .
9. Operator only affected party.. . . . . . . . . . . . . . . . . .
10. Operator has appropriate bond in force. . . . . . . . . .
11. Permit can be issued without conservation order. . . . . . . .
A~. P ~ DATE 12. Permit can·be issued without administrative approval.. . . . .
þ(J ~I {-O~·13. Can permit be approved before 15-day wait.. . . . . . . . . .
ENGINEERING 14. Conductor string provided . . . . . . . . .. . . . . . . . . .
15. Surface casing protects all known USDWs. . . . . . . .
16. CMT vol adequate to circulate on conductor & surf csg. . . . .
17. CMT vol adequate to ,tie-in long string to surf csg. . . . . . . .
18. CMT will cover all known productive horizons. . . . . '. . . . .
19. Casing designs adequate for C, T. 8 & permafrost. . . . . . .
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . .
21. If a re-drill, has a 10-403 for abandonment been approved. . .
22. Adequate well bore separation proposed.. . . . . . . . . . . .
23. If diverter required, does it meet regulations . . . . . . . . . .
24. Drilling .fluid program schematic & equip list adequate. . . . .
25. 80PEs. do they meet regulation . . . . . . . . . . . . . . . .
26. BOPE press rating appropriate; test to psig.
. 27. Choke' manifold complies w/API RP-53 (May 84). . . . . . . .
28. Work. will occur without operation shutdown. . . . . . . . . . .
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . .
30. Permit can be issued w/o hydrogen sulfide measures. /Y}N ../ . /'
31. Data presented on potential overpressure zones. . . . . . . ~ y &-*-+1;<'-/.' ··Ie 'J.__í.A_£;~}__'_""¡~'( ¡{/Lch"'7!è,.S. /-'¡,;r);~ '¿~':':î. ~¡ ¡.(.."þ<.'J.ý-l ,4
32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . . . .. ~ ~ . <- 3ÒC~ I "'1"L.D.s:<. . !-KZ.¿ ~-d b::..';¡:;;s-t.6 ~_ ,þ.e.¡'1.IZ-~'~ t~F ~~Þ<..--
APJ1,.R DATE 33. Seabed cond,bon sUlVey fof off-shore). . . . . . .._.~.~ ¡J Y N "¿<<>4-<.., ~".. (J/;;> 1 c....,,;; L·<"··iÆ - L-YtJ::;e. L .,LLd .,4) b.> ¿.·r;,.f -~-<I? C:: /;-I¿d
/~.r~ '"2~' I· D '2.--34. Contact name/phone for weekly progress reports [~ratory only] Y N // () ~
ANNULAR DISPOSAL35. With proper cementing records. this plan .
(A) will contain waste in a suitable receiving zone; . . . . . . .
(8) will not contaminate freshwater; or cause drilling waste. "
to surface; .
(C) will not impair mechanical integrity pf the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 MC 25.252 or 20 AAC 25.412. Y N
GEOLOGY: ENGINEERING:' UIC/Annular COMMISSION:
RÞð gL- ~ /' WM '8?s
S ~ . +~I;,\ k"1>p-l':i JMH 1\f+ J
(" { t {'!' t~{A."t,I,,,!,,,,:,:',,,(
WELL PERMIT CHECKLIST
, FIELD & POOL ..5?;~2S- / s/D
ADMINISTRA TION
APPR D!\~
l'tGA- 2/4tp'-
~ r--/~
GEOLOGY
APPR
DATE
fll'fT ,I
./
,~
/'
~\,' i,
c:\msoffice\wordian\diana\checklist (rev. 11/011100)
~~ ~c:4.,4'r;~ ~ A-:J:>L 3g0/CJ7'/ -fr /P")'Z'.et ~·I¿.yvcR ~
~:D. ~ AZ>i- 3'$D//O, ..4- ¡/ .
N
N
N
N
Y N
~ N ~t €J J' S (, V (). . ._ / . . _~ ~ _ __. ,
- N r~¡¡;;~~ ~4rJ ..c~~rI-/..~, e[?.sç(i5"05 TV~ f~---'--., .:ft~~ c·~.
Nt}þ Iý'r ~.fe¿¡" ~',~:-"1,"~~J 1;-~\.h~J ¿{S~ 7'i/I(;'1~i5' r.J ,",--~t,../I ~,-~. '
. Y N /'JIf-.T~ ¿;··fl9J. u:¡e(~ J/11¡--Zé 11-·/ ~-."d . 1:-¡4:U:"~<; /rJ4.dltPc- #( f,1......d:íc:'i.I-+,-
~ N ~n/ ~ 0/.. C"fj""".h--r- c;;.r:ë...1 '? 5'CY:)rv. D t4. -:f 2öC:> -- ~C:::i) ~.I /7/AL.
N {jP;:;' I ¿;<'Yila..-< ..;;~~ r,·.-,M.... 2-&>c:c>.- 3icc/ rvr:> ~Ct:¥]dud .c:c..kL.,.f- .3ZCCJ
. N·~.... .~pµ ,ß-l /uqk.< '¿dA"!,W¿;~ /2.lj¿R~UlJ~:A! ~~/<~C.J ---'::;;2("21?(nt. ~
Ai/A. ~ N ;/éC) # Z /, -;i-t.'''';'; ,þ-- '-L/-J::::v:r:'h8¿-t.- -fe,., ""¡'I-C-:/t....¿.LL ~·····/~d ·~¿/~W I
, N .
, N tJ: ovb-o ~~ '2..1 G.
, N ' .
Y NMI\SP,::~'S¡'fpÇ.¿. '
¡.iIA ~ ~ j).:¡1{e-,,-¥--r Ç¡.J 1 - iv; ßo(}&,
Y~
Y N
Y N
Ak cw.. Vl Jew J;, Ç.fD Ç.u-I t" 'l' r t<1 C; :þ J .
Com ments/lnstructions:
d-/5) (;).À
'0
0
Z (
0
-t
:E
::0
-t
m
Z
-t
J:
en
>
::0 (
m
>
)
)
Well History File
APPENDIX
Information of detailed nature that is riot
particularly germane to the Well Pennilting Process
but is part of the history file.
To improve the readability of the Well History file and to
sim,plify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
:,)
é)O¿;)- o~ 0
109'17
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Thu Jun 13 10:35:27 2002
Reel Header
Service name... . . . . . . . . . .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 0 6 / 13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/06/13
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point Unit
MWD / MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-9i
500292306700
B.P. Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
13-JUN-02
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 1
AK-MW-22033
V. LOPEZ
C. DIXON
MWDRUN 2
AK-MW-22033
V. LOPEZ
L. BROWN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
1934
49
MSL 0)
73.20
39.20
#
WELL CASING RECORD
1ST STRING
2ND STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.875 20.000 113.0
)
)
3RD STRING
PRODUCTION STRING
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1 AND 2 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS,
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4), AND PRESSURE WHILE
DRILLING (PWD).
4. LOG AND DIGITAL DATA ONLY WERE SHIFTED TO A
SCHLUMBERGERCASED-
HOLE GAMMA RAY LOG RUN IN MPS-09 ON 26 APRIL 2002.
THESE PDC DATA
WERE PROVIDED TO SSDS BY DEWAYNE SCHNORR ON 11 JUNE
2002. LOG HEADER
DATA RETAIN ORIGINAL DEPTH REFERENCES.
5. MWD RUNS 1 AND 2 REPRESENT WELL MPS-09 WITH API#:
50-029-23067-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
8924.5'MD/4585'TVD (SHIFTED
DEPTHS) .
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP
RESISTIVITY) .
SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/13
Maximum Physical Record. .65535
File Type.. . . . . . . . . . . . . . .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
75.0
99.5
STOP DEPTH
8886.5
8879.0
) )
RPD 99.5 8879.0
RPM 99.5 8879.0
RPS 99.5 8879.0
RPX 99.5 8879.0
ROP 111.5 8924.5
$
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH -----
BASELINE DEPTH GR
67.0 68.0
7721.0 7722.0
7742.5 7741.5
7789.5 7785.5
7818.0 7813.0
7850.0 7847.0
7880.5 7880.5
7900.5 7901.0
7931.0 7930.5
7943.0 7947.5
7958.0 7961.0
7971.0 7972.0
8003.0 8002.0
8014.0 8013.5
8056.5 8055.0
8104.0 8103.5
8166.5 8164.0
8182.5 8179.0
8206.0 8205.0
8246.5 8245.0
8301.5 8301.0
8315.0 8315.0
8338.0 8337.0
8356.5 8354.5
8377.5 8378.0
8380.0 8379.0
8426.0 8424.5
8480.0 8481.5
8493.5 8494.0
8543.0 8542.0
8551.0 8551.0
8558.5 8559.5
8598.5 8597.0
8645.5 8643.0
8653.0 8650.5
8684.5 8682.5
8730.0 8728.5
8745.0 8743.0
8771.5 8770.0
8924.5 8923.0
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 76.0 4077.0
MWD 2 4077.0 8923.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
)
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 75 8924.5 4499.75 17700 75 8924.5
ROP MWD FT/H 0.98 1225.71 262.001 17627 111.5 8924.5
GR MWD API 10.55 121.44 66.3882 17624 75 8886.5
RPX MWD OHMM 0.13 1047.84 29.9814 17560 99.5 8879
RPS MWD OHMM 0.15 1644.47 39.8507 17560 99.5 8879
RPM MWD OHMM 0.32 1988.06 43.8795 17560 99.5 8879
RPD MWD OHMM 0.11 2000 44.0102 17560 99.5 8879
FET MWD HOUR 0.0522 15.0789 0.533569 17560 99.5 8879
First Reading For Entire File......... .75
Last Reading For Entire File.......... .8924.5
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/13
Maximum Physical Record. .65535
F i 1 e Type................ LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/13
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
2
header data for each bit run in separate files.
1
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPX
FET
RPD
RPS
RPM
ROP
$
"
.5000
START DEPTH
76.0
100.5
100.5
100.5
100.5
100.5
112.5
STOP DEPTH
4039.0
4032.0
4032.0
4032.0
4032.0
4032.0
4077.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
#
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
23-FEB-02
Insite
66.37
Memory
4077.0
75.0
4077.0
.6
76.7
TOOL NUMBER
2385HWRG6
2385HWRG6
9.875
SPUDMUD
9.10
123.0
8.0
600
11.2
2.400
1.870
5.000
6.000
50.0
65.9
50.0
50.0
)
")
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
RPX MWD010 OHMM 4 1 68 12 4
RPS MWD010 OHMM 4 1 68 16 5
RPM MWD010 OHMM 4 1 68 20 6
RPD MWD010 OHMM 4 1 68 24 7
FET MWD010 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 76 4077 2076.5 8003 76 4077
ROP MWD010 FT/H 0.98 835.36 181.821 7930 112.5 4077
GR MWD010 API 10.55 121.44 63.5639 7927 76 4039
RPX MWD010 OHMM 0.13 1047.84 43.9139 7864 100.5 4032
RPS MWD010 OHMM 0.15 1644.47 64.8672 7864 100.5 4032
RPM MWD010 OHMM 0.32 1988.06 75.2649 7864 100.5 4032
RPD MWD010 OHMM 0.11 2000 73.5106 7864 100.5 4032
FET MWD010 HOUR 0.1208 1.4927 0.452409 7864 100.5 4032
First Reading For Entire File......... .76
Last Reading For Entire File.......... .4077
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/13
Maximum Physical Record. .65535
File Type... . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/13
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
3
header data for each bit run in separate files.
2
.5000
)
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
START DEPTH
4032.5
4032.5
4032.5
4032.5
4032.5
4039.5
4077.5
STOP DEPTH
8877.5
8877.5
8877.5
8877.5
8877.5
8885.0
8923.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
)
25-FEB-02
Insite
66.37
Memory
8923.0
4077.0
8923.0
.6
77.9
TOOL NUMBER
2385HWRG6
2385HWRG6
9.875
LSND
9.30
116.0
8.0
450
5.5
1.650
1.170
5.000
4.600
60.0
87.0
60.0
60.0
)
)
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Service Order
Units
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
Size
4
4
4
4
4
4
4
4
Nsam Rep
1 68
1 68
1 68
1 68
1 68
1 68
1 68
1 68
Code
Offset
o
4
8
12
16
20
24
28
Channel
1
2
3
4
5
6
7
8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
MWD020
MWD020
MWD020
MWD020
MWD020
MWD020
MWD020
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 4032.5 8923 6477.75 9782 4032.5 8923
ROP MWD020 FT/H 2.62 1225.71 327.131 9692 4077.5 8923
GR MWD020 API 16.69 120.51 68.7094 9692 4039.5 8885
RPX MWD020 OHMM 1.65 605.06 18.6815 9691 4032.5 8877.5
RPS MWD020 OHMM 1.61 506.7 19.5625 9691 4032.5 8877.5
RPM MWD020 OHMM 1.53 291.13 18.4267 9691 4032.5 8877.5
RPD MWD020 OHMM 1.72 367.77 20.089 9691 4032.5 8877.5
FET MWD020 HOUR 0.0522 15.0789 0.599395 9691 4032.5 8877.5
First Reading For Entire File......;.. .4032.5
Last Reading For Entire File.......... .8923
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .02/06/13
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.004
Physical EOF
Tape Trailer
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 02/06/13
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name. . . . . . . . . . . . .LISTPE
Date.....................02/06/13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
)
)
Physical EOF
Physical EOF
End Of LIS File