Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-020 Image'" .'bject Well History File C...~er Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. JQJ.. - OJ. 0 Well History File Identifier Organizing (done) o Two-sided 11I111111I111111111 ~scan Needed 1 R~CAN ~ Color Items: o Greyscale Items: DIGITAL DATA ~Sketles. No. ~ o Other, NolType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: Scanning Preparation .~ x 30 = &ð o Other:: Date: ~ ¡z 0S-- /s/ vwJ , 1'1 1 Date: <6( I ~ DS /s/ V11 ~ +?-3 = TPT~ PAGES g- 3 (CounY1ße) ",ot i clude C.over sheet~ II A () Date: '!5 '7 OS 151 VV~, 111- - BY: Helen ~ Project Proofing BY: Helen~ BY: Helen ~ia. ) BY: Production Scanning Stage 1 Page Count from Scanned File: Y; if (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES I NO Helen ~ Date: ~ I 7 , ()6 /s/ Vì1 ~ If NO in stage 1, page(s) discrepancies were found: YES NO Stage 1 BY: Helen Maria Date: 151 II! 11111111111 11111 111111111111111111I I 1 Date: 151 Quality Checked 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned BY: Helen Maria Comments about this file: • bp BP Exploration (Alaska) Inc. Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 1`' J F E B 2 4 ZU1c Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7 Avenue Anchorage, Alaska 99501 ,fin P6- c3 Subject: Corrosion Inhibitor Treatments of MPS -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, • Mehreen Vazir BPXA, Well Integrity Coordinator 410 41, BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPS -Pad 10/11/2011 Corrosion • Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 -----> MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011 MPS -12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 7/29/2011 MPS -17 2021730 50029231150000 Open Flutes - Treated MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009 MPS -22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011 MPS-23 2021320 50029230980000 Open Flutes - Treated MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011 MPS -25 2021030 50029230890000 Open Flutes - Treated MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS -28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011 MPS -29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 50029231310000 1.2 NA 12 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011 MPS-33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 , 7/28/2011 MPS-37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011 MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011 MPSB -04 _ 500299990799 0.6 NA _ 0.6 NA 3.4 7/30/2011 ~ • ~ ~ '... atr'~ t'...-~, ~.v i.; ~ -1 ~ ~ ~ ~ y ~ _°~ ~ -.~~ ~a ~ g- =; ~~p~ ~ ~ ~ ~ ~~ ~ ~ ~ ~j~~~ ~ ~ ~" ~ ~ ~~'v ~ ~ ~ ~~ r ~ SEAN PARNELL, GOVERNOR ~g~~A~g~cp~~.~ e~~~~~~~~^j~ P~~~~ ~_~ ~ J ~ W.~J~' ~,~ ~a~~.,f/ ~ ~ i~ .,=..Y ~ ~:~ Ir~ ~ ~_. ~ ~-7~ ~I~ ~D Vu~-.7 ~ 333 W. 7th AVENUE, SUITE 100 CO1~T5ERQATIOrIT COMI~IISSIOI~T ~ pHONORA(9 ;A2?9KA339501-3539 ~ FAX (907)276-7542 October 20, 2009 Mr. Harry Engel Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AL 99519-6612 ~~~~~~ ;;~r~ ~r ~. ~ 2D~9 Re: Milne Point Unit, Schrader Bluff Oil Pool, MPS-02, MPS-0 MPS- l0A and MPS-26 203-127 202-020 205-125 and 203-061 BP Exploration (A aska) Inc. Dear Mr. Engel: Enclosed are the work descriptions for subsurface well treatments in the listed wells that were erroneously submitted containing information and operational details proprietary to BP. These work descriptions have been replaced with the edited documents you supplied. Sincerely, .~ Thomas E. Maunder, PE Sr. Petroleum Engineer Enclosures (4) -~- ° ~ +1 o c-~ P°ce s~ c~.~ ~. ~~J-F~~ STATE OF ALASKA ALASK~L AND GAS CONSERVATION COMMIS~N REPORT OF,S,~NDRY WELL OPERATIONS ~ ~"' . ~ n.~ ~,". ~ ~~~ ~ ~, ~ F ~^~ y g 1('~~kCl. ~ t_ ~. ~~ .¢. ~ ,<c.~.. ~. 1. Operations Abandon ~ Repair Well ~,y Plug Perforations ~ Stimulate ~ ° ~ q~R Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver ~ Time Extension ~ - Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well ~ 2. Operator BP Expforation (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: tvame: De~elopment ~ Exploratory ~! 202-0200 . 3. Address: P.O. Box 196612 Stratigraphic ~ S~~"~C@ ~ 6. API Number: ~ ~ Anchorage, AK 99519-6612 50-029-23067 ~6!00 ~(j 7. KB Elevation (ft): 9. Well Name and Number: 73.2 KB MPS-09LS . 8. Property Designation: 10. Fieid/Pool(s): ADLO-380110 Q~ ~p(~l Milne Point Field/ Schrader Bluff Pool 11. Present Well Condition Summary: Total Depth measured 8923 feet Plugs (measured) None true vertical 4583.59 feet Junk (measured) None Effective Depth measured 8828 feet _ true vertical 4516.13 feet Casing Length Size MD ND Burst Collapse Conductor 112 20" 92# H-40 34 - 112 SURFACE - 112 1530 520 Surface 8914 7"26# L-80 34 - 8914 34 - 4577 7240 5410 ,,~~~ ~~ ~ ~~l~„,~ c>;; 't _.°Si:,~ . ~ Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Verticai depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 2-3/8" 4.6# SHORT L-80 8526' - 8541' 2-3/8" 4.7# LONG L-80 8915' - 863~ ~~ ~~` S~~C~ Packers and SSSV (type and measured depth) 7"x2-3/8" BAKER "GT" RET DUAL PKR 8526' rJ 7"x2-3/8" BAKER "FH" RE7 PKR 8615' ~ c.~ f paC~~ r' 0 0 ~ ~~~ • ` _ • J' ~ 0 0 ~~ 9~`~ 12. Stimulation or cement squeeze summary: Interoals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: Subsequent to operation: 14. Attachments: 15. Well Class after qroposed work: Copies of Logs and Surveys Run Exploratory I~ De~elopment ~ Service ~ Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~ Gas ~ WAG ~ GINJ ~ WINJ ~ WDSPL ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: ~ 309-~ ~ ~ Contact Paige Sloan Printed Name Paige Sloan Title Production Engineer Signature Phone 564-4278 Date 9/1/2009 Form 10-404 Revised 04/2006 ~ Submit Original Only • ,•, r -, "~` ~~ .t~r,. :~ ~ 2~0~ a- ,~r ~/~j ~::~ M PS-09 202-020 PFRF OTTO(_HMFNT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPS-09 6/15/03 PER 8,554. 8,594. 4,327.92 4,354.31 MPS-09 6/15/03 PER 8,654. 8,684. 4,394.96 4,415.61 MPS-09LS 6/15/03 PER 8,654. 8,684. 4,394.96 4,415.61 MPS-09SS 6/15/03 PER 8,554. 8,594. 4,327.92 4,354.31 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~ e ~ ~ • MPS-09LS DESCRIPTION OF WORK COMPLETED NRWO OPERATIOS EVENT SUMMARY ACTIVITY DATE SUMMARY 04/Aug/2009 Gel Treatment. Unable to pump on well. LR RU and pump acid stimulation. 07/Aug/2009 Gel Treatment. RU and pump injectivity test. Pump gel with cross link treatment. Cont' on 8/8/09 WSR. 08/Aug/2009 Gel Treatment. Cont' from 8/7/09 WSR. Finish pumping gel stage and freeze protect well with methanol. Standby for results of gel testing. Pump injectivity test with produced water. Send pump results to town and wait on plan forward. RD pumping equipment. Cont' on 8/9/09 WSR. 09/Aug/2009 Gel Treatment. Cont' from 8/8/09 WSR. RD complete. Notify operator of well status. ***Job Complete** FLUIDS PUMPED BBLS 23.7 Methanol 51 Gel 10 15% HCI 234.5 Produced Water • ~ F.. >. I'. P ," Y~ R~ ~ _ ,~ ~ ut~ & ~ ,. ~ \r~ '~ E" ~r i 4' aJ~ ~~ ~~1 c' t f~s t A:~"t. s~ i S~~ ~C !'~ ~_ z..- ~"'~` 'f.d b. ~ne ~~ ~.~~~F.~= ~t"~ ~ . ~..~: ~.F ~~~;. ~-7~ Q~J L~l~l1 tiA~7 C01~5ERQATIOI~T COrII~IIS51OrT Paige Smith Production Engi.neer BP E~loration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 ~t~-~-~~~'~ `~~~' • SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE,ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 " '~ ~~~~ ~:~ Re: Milne Point Field, Schrader Bluff Pool, MPS-09 Sundry Number: 309-213 ~b~,_ o~~ Dear Ms. Smith: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, withiri 20 days after written notice of this decision, or such further time as the Corrunission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. ~L Chair ~~ DATED this ~ day of July 2009 Encl. • ~,,,Q~ STATE OF ALASKA ~p~ ,~~\~v ~ ALAS~OILAND GAS CONSERVATION COMMI~N ~~/~~ APPLICATION FOR SUNDRY APPROVALS "~l 20 AAC 25.280 ~~~~~~~~ ~j~~ JUN 2 3 2QQ9 ~ ~laska Oil & Ga~ Cons. ~ommiss's~n,, 1. Type of Request: Abandon ^ Suspend ^ Operational shutdown ^ Perforate ^ Waive~~!~i~~~ Other Alter casing ^ Repair well Q ~ Plug Perforations ^ Stimulate ^ Time Extension ^ POLYMER JOB • Change approved program ^ Pull Tubing ~ Perforate New Pool ^ Re-enter Suspended Well ^' M 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: BP Exploration (Alaska), Inc. Development ~ Exploratory ~ 202-0200 ~ 3. Address: P.O. Box 196612 Stratigraphic ~ Service ~ 6. API Number: Anchorage,AK 99519-6612 50-029-23067-00-00 7. !f perForating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: properry line where ownership or landownership changes: Spacing Exception Required? Yes ^ No ^ MPS-09 • 9. Property Designation: 10. KB Elevation (ft): 11. Field/Pool(s): ADLO-380110 ` 73.2 KB - MILNE POINT Fieid / SCHRADER BLUFF Pool . 12• PRESENT WELL CONDITtON SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth ND (ft): Plugs (measured): Junk (measured): 8923 ' 4583.59 , 8828 4516.13 NONE NONE Casing Length Size MD ND Burst Collapse Structural Conductor 112' 20" 92# H-40 34 112 34 112 1530 520 Surface 8914' 7" 26# L-80 34 8914 34 4577 Intermediate Production Liner Perforation Depth MD ft): ~~ Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): '~`~ '~ ~~ 2-3/8" 4.6# SHORT L-80 8541' 8526' - - 2-3/8" 4.7" LONG L-80 8637' 8615' Packers and SSSV Type: Packers and SSSV MD (ft}: 7"X2-3/8" BAKER GT RET DUAL PKR 8526' 7"X2-3/8" BAKER GT RET DUAL PKR 8615' 13. Attachments: Description Summary of Proposal Q 14. Well Class after proposed work: Detaiied Operations Program ~ BOP Sketch ^ Exploratory ^ Development ^ Service ~' 15. Estimated Date for 16. Well Status after proposed work: Commencing Operations: 7/7/2009 Oil ~ Gas ~ Plugged ^ Abandoned ~ 17. Verbal Approval: Date: WAG ~ GINJ ^ WINJ Q~ WDSPL ~ Commission Representative: Prepared by Gary Preble 564-4944 1 S. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact pAIGE SMI7H Printed Name p E SMITH Title PRODUCTION ENGINEER Signature . Phone Date 564-4728 6/23/2009 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ~Z ~ 3 Plug Integrity ^ BOP Test ~ Mechanical Integrity Test ^ Location Clearance ~ ~~~~~~~~ Other: J(~N 2 3 20Q9 ~I,~ska ~iI ~'~ !~~~ ~~~~, ~, C~~FIn'11S P,_. Subsequent Form Required: ~~ ~ Gh~ ~v'ipgc~G ~~- p~y~ ~~ j'~ ~~~~~LC~ ~.Qe~.~ ~~~ 5~0~~~ , `V~~ ` APPROVED BY / ~ ~ / ~ Approved by: COMMISSIONER THE COMMISSIO Date: ( ~~ Form 10-403 Revised O6/2006 ~~~ j~~ ''~~~` Submit in Duplicat ~~~~ ~ v ~ ~, M PS-09 202-020 PFRF OTTOC:HMF_NT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base MPS-09 6/15/03 PER 8,554. 8,594. 4,327.92 4,354.31 MPS-09 6/15/03 PER 8,654. 8,684. 4,394.96 4,415.61 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO ~ILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • n ~J r 1 ~ Tree: crw 2 v~e- sr~ ouai str:~ 4Mehead:ll' x 2 31~ 51N FMC dual slring M PS-09 i HangQr Ihread 2 3t8' EUE top ard IBT 60l 2' GW-H BPV proTie 20" x 34' i~d, 215 ~A"(t A-53 112' I Shart Strina 2985' 2~1'6" HES X-PVQpIQ (1.875 pkkp.. 6ore) KOP ~ 38d' 80t depree ban 3285' to 83@5 Mex. hole angle = 78 deg ~ 4050-4425' Hoie an81e hu perf = 49 dep T 26AF. L~0.19T MOD Casiip (drift id = 8.151, ceP = .0~3 bpf~ 2-3f8'. 4.7 #At L-80. IBT tubing (driR id = 7.907, cep-=-00387 6pf) ' ~ 2-3f8' HES X-t~ppl4 (1.875' pkg. bore) 8535' 2-3f8' HES XN-P6pple (1.875' pkg. bon No-Go 1791" 8541' Tubi~e fail I WLEG Pertoration Summary Size Spf Ir~berval (TVD) 4 51B' 4 5!8' 5 5 na ~v.,~ 8554' - 85~4' OB sands 8854' - 8884' 4328' - 4356' 4395' - 4419' Orig. KB Elev. = 73_20 Otig. GL Elev. = 29.20 ~: r~6e.a~a~ aun~d hanpv 2-3J8' HES Xa+lipQle (1_87S pkg_ bore) 299T ' 2-3l8" HES X-Nipple (1_875' pkg_ bore} ~ r snon .ir_ s4~~ - s~oea• r x 2-3ra- sawe- -~r R~. a~ qQ_ s5ze• ~_eas ro. T z 2-318' Baber'FH' Ret pkr. 8815' 2_4~' ID. 2-3fB' HES JSN-~kppie (7.875' Pk6• bmel 8627' No-Go 1.781' 2-3J8' Baker'E' Flydio Trip Sub 8837' yd b' m~we P~P l~ ~P~~ ~ (7.62" pkg bare) Hydro Tnp Sub ELMD ~~" ~ ~.~5 ~n. 8828' T H~libkrbn Float CoNar PBTD 8913' 7' Hai6urton Iloet shoe ~ DATE REV_BY COMMENTS er~~roa tee Hui~ wen ~ea ar~d ~,p~a by ooy«, ~a MILNE POINT UNIT YYELL No.' S-09i ARI : 50-029-23067-00 BP EXPLORATION (AK) • • Maund~er, Thomas E (pQA) From: Engel, Harry R [Narry.Engel@bp.comJ Sent: Wednesday, August 12, 2009 7:49 AM To: Maunder, Thomas E (DOA) Subject: Revised Procedures for AOGCC re: MPU gel treatments Attachments: MPS-02 Ge! 7reatment.doc; MPS-09LS Gel Treatment.doc; MPS-10LS Gel Treatment.doc; MPS-26SS Gel Treatment.doc ~o~-oa ~ ~~ ~~ ;~:` `~~ MPS-Q2 Gel MPS-04L5 Gel MPS-10LS Ge! MPS-26SS Gel reatment.doc (110 .freatment.doc (ii..~reatment.doc (10..freatment.doc (85.. Good morning Tom- Enclosed are the procedures I propose for the Milne Pt. Sundries. Please review and let me know if these meet your needs. If so, I recommend we substitute these for what was previously submitted. Thanks for your assistance in this matter. Harry Engel Engineering Team Leader Alaska Drilling & Wells ~~~~~~~:~ ~~~`tf '~ ~ Z00~ ~ To: Mark O'Malley/Jerry Sharp Date: June 22, 2009 MPU Well Operations Supervisor From: Paige Smith, MPU Schrader-S Pad Engineer Subject: MPS-09 LS Gel Job ~~ ~_~ ~~ Step Unit Operation 1 O Shut in all offset producers and offset injector. Bullhead 10 bbl gel into MPS- 09LS. 2 O Bullhead ~500 bbl gel down MPS-09LS. Keep well and offset producers and injectors shut in for minimum of 7 days and flow producers to a tank before returnin to production. OBJECTIVE 1. Divert water from its preferential path. Measure of success 1. Gel treatments are fully displaced into formation. 2. Post injection is adequate to achieve injection rate target at below target pressure. CRITICAL ISSUES • Ensure pumping pressure is not above the fracture gradient (~1000 psi for MPS-09LS). • Ensure cleanliness of pump equipment and hard line (pre and post job) & properly dispose of remnant gel per guidance from the Environmental Team. PROCEDURE Stage1. Injection Test 1. RU, hold pre-job safety meeting, PT surface lines 2. Ensure offset injectors and producers are SI 3. Spear in with 1-2 barrels of Methanol, pump 70 bbls produced water preflush, 10 bbls gel and 70 bbls produced water over flush. Pump at 1 bpm with a max pressure 1500 psi (frac pressure + estimated friction). Attempt to hold injection rate constant while adjusting pressure as needed. 4. Contact Engineering to discuss the injection pressure/rate trends. Once consensus is achieved that the fluid can be successfully placed into formation at acceptable rate/pressure continue with remainder of program. ~ • Stage 2. High Volume Gel Treatment 5. Ensure offset injectors and producers are offline 6. Pump 35 bbls produced water preflush, ~500 bbl gel and 60 bbls produced water over flush followed by 10 bbls freeze protect. Pump at 1 bpm or a max pressure 1500 psi WHIP (frac pressure + estimated friction). However, injection pressure limits may be exceeded as necessary to avoid trashing the wellbore by leaving gel in the tubing or liner. 7. Capture a gel sample at surface and suspend in a warm water bath (to simulate downhole conditions) to monitor actual setting time. 8. Rig down all equipment and hold post-job assessment meeting to capture learnings to be incorporated into future jobs. 9. Forward all post job assessments (w/ all rheology test summary) and continuous pressure and rate data from job to Pad Engineer. ~ ~ Tf~e: ~~yM 2 1I18" 5M Duel strimg " " Q ~ P S O x 2 3l8 56t FMC dual string Welhe6d:11 ~ ~/ ~ Hanger thread 2 3J8° EUE Uop and 16T bot6o 2' GIW-H BPV profil~ 2fl" x 34" irasuta~ed, 215 #rft A-53 f 12' Short Strina 2gg5' 2-3J8' HES X-Ni~te (1.875' pkg. bore} ;. KOP ~ 380' 80+ degree frortt 3285' to 8365' Ntax. twle ar~e = 78 dee ~ 4ip50-4425 Haie ar~e thru perfs = 49 deg 7" 201F. L-80. IBT MOD Casng (driR id = 8.151, cep.= .D383 bpfl 2-318", 4.7 #1R L-S0, 16T tubing (drift id = 1.901, cap.=.U0387 bpf) ~ 2-3/8" HES X~lipple (t.875' pkp. bore) 8535' 2-318' HES XN-Nipple (1.875' pkg. bor No-Go 1.791' 8541' Tub~g tail f WLEG Pertoration 5ummary Siae SRf Interval (TVD) 4 5J8" 4 5JB' 5 5 ne ~n~,~ 8554' - 8594' D6 sands 8654' - 8884' 4328' - 4355' 4395' - 4419' Qrig_ KB Elev. = 73.2d Orig. GL Elev. = 29.~0 Ncte- 7" casing is landed aa mam~el fwng~. 2-3/S HES X-Nipple (1_875' pkg. bore) 2~97' 2-318' HES X-Nippie ( 7.875' pk8. hore) ~ r snort .h ~a~e~ - eaee~ 7' x 2-3J8' Beker'~GT' Ret dual pkr_ 8526' 1.645 ID. Y x 2-3/8' Beker'FH' Ret piv. 8615' 2.49" ID. 2-318' HES XN~/ippk (1.875' pka. borey &927' No-Go 1.791' 2-3i8' Baker "E' Hydro Trip Sub gg37' w18° muleshce pup (bdfom depth) ~ ~~.sr q~9. no~ey Hydro Trip Sub ELMf} sest' ~ t.7s beit. $~' ' 7' Hellburlon Floet Coilar PBTD ~~ ~ ~~„r-z, y~~y4 r~! 89'13' 7" Ha~iburhon float shoe , ' Df1TE RE'J. BY COMMENTS e~+17ro~ ~e~e Hnlme Well MILNE POINT UNIT s4ueezed and compleEed by Doyon 14 y~LL No.' 5-091 API : 50-029-23067-0D BP EXPLORATION (AK) . MEMORANDUM State of Alaska . Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor Kø[~{ 4/26/ü7 DATE: Monday, April 23, 2007 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC S-09 MILNE PT UNIT SB S-09 JjJ 1-"" 0 '}-O FROM: Chuck Scheve Petroleum Inspector Src: Inspector Reviewed By: P.I. Suprv .::::n:te Comm NON-CONFIDENTIAL Well Name: MILNE PT UNIT SB S-09 API Well Number: 50-029-23067-00-00 Inspector Name: Chuck Scheve Insp N urn: mitCS0704 1508 I 225 Permit Number: 202-020-0 Inspection Date: 4/14/2007 Rei Insp N urn: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well S-09 Type Inj. w ITVD 4368 IA 280 I 1710 I 1670 1670 P.T.D 2020200 TypeTest SPT I Test psi 1~()0 OA i I Interval OTHER P/F P v Tubing 800 -r 800 I 800 800 Notes: Test performed due to leaks encountered on other monobore completions. sCANNED APR 3 0 2007 Monday, April 23, 2007 Page I of I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to:Winton_Aubert@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;Jim_Regg@admin.state.ak.us;Tom_Maunder@admin.state.ak.us OPERATOR: FIELD / UNIT / PAD: DATE: OPERATOR REP: AOGCC REP: BP ACT / Milne Point / S-Pad 04/14/07 Jeff Rea / Lee Hulme Chuck Scheve arJav-IJ;}..O Packer Depth Pretest Initial 15 Min. 30 Min. WeIlIMPS-07 I Type Ini. N TVD I 4,231' Tubing 400 500 500 500 Interval 0 P.T.D.12020720 I Type test P T est psi! 1500 Casing 1,700 1,650 1,640 PtFI P Notes: 4.4 bbls diesel to 1700 psi. Bled to 0 psi OA Well is currently SI. Proactive testing to determine IA status due to leaks found on other monobore completions. WeIlIMPS-09 I Type Ini. W TVD I 4,368' Tubing 800 800 800 800 Intervall 0 P.T.D.12020200 I Type test P Test psil 1500 Casing 280 1,710 1,670 1,670 PtFI P Notes: 1.6 bbls diesel to 1710 psi. Bled to 300 psi OA Proactive testing to determine IA status due to leaks found on other monobore completions. WeIlIMPS-13 I Type Inj. N TVD I 4,166' Tubing 1,220 1,220 1,220 1,220 Interval I 0 P.T.D.12021140 I Type test P Test psil 1500 Casing 1,800 1,720 1,720 PtFI P Notes: 3.4 bbls diesel to 1800 psi. Bled to 250 psi OA Well is currently SI. Proactive testing to determine IA status due to leaks found on other monobore completions. WeIlIMPS-21 I Type Ini. N TVD I 4,027' Tubing 200 250 250 250 Intervall 0 P.T.D.12020090 I Type test P T est psi! 1500 Casing 220 1,720 1,680 1,680 PtFI P Notes: 1.7 bbls diesel to 1720 psi. Bled to 200 psi OA Well is currently SI. Proactive testing to determine IA status due to leaks found on other monobore completions. Weill I Type Inj. TVD I Tubing Interval! P.T.D.I I Type test T est psi! Casing PtF Notes: OA . . TYPE INJ Codes D = Drilling Waste G = Gas I = Industrial Wastewater N = Not Injecting W = Water TYPE TEST Codes M = Annulus Monitoring &CANNED APR 1 '1 2007 P = Standard Pressure Test R = Internal Radioactive Tracer Survey A = Temperature Anomaly Survey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover 0= other (describe in notes) MIT Report Form BFL 9/1/05 .. ,,"4 .....,a..!L_,~.!~,~~ ,'~ ' MIT MPU S-07, S-09, S-13, S-21 4-14-07.xls . . .. MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _ Inserts\Mîcrofilm _ Marker.doc ) 7 Jt1l ~ ~_A ~ ~-- DATA SUBMITTAL COMPLIANCE REPORT 7/6/2005 51'(,~ ~ I ~?;,L fJ~'\- API No. 50-029-23067-00-00 Permit to Drill 2020200 Well Name/No. MILNE PT UNIT SB 5-09 Operator BP EXPLORATION (ALASKA) INC MD 8923,......- TVD 4584 /' ~ Completion Date 6/17/2003 ~-~~Y ) Completion Status 1WINJ Current Status 1WINJ REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes --- ----~- DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, CCL, USIT Well Log Information: Log/ Data Digital Type Med/Frmt c/>cõg Log 'Log ~ C : Efr' C RPt ftÐ'/ D (data taken from Logs Portion of Master Well Data Maint) Electr Dataset Log Log Run Interval OH/ ~ Number Name Scale Media No Start Stop CH Received Comments Temperature 5 Col 1 7700 8809 Case 6/4/2002 Pressure 5 Col 7700 8809 Case 6/4/2002 Cement Evaluation 5 Col 7700 8809 Case 6/4/2002 10912 Cement Evaluation 7706 8794 Case 6/4/2002 11402 See Notes 113 8923 ~ 12/13/2002 Digital Well Logging Data 1 Rate of Penetration, Dual Gamma Ray, Electromagnetic Wave Resistivity LIS Verification 10947 L1S-Ve,ifil.Mion G ~~ ~ UJ yt '-l Ad yð 75 8886 Open 7/2/2002 75 8886 Open 7/212002 Sample Set Sent Received Number Comments ~ "-' Well Cores/Samples Information: Name Interval Start Stop ADDITIONAL INFORMATION Well Cored? Y ® Daily History Received? <iÌ/N @/N Formation Tops Chips Received? ..¥-J..N-- Analysis Received? -- Comments: ~ DATA SUBMITTAL COMPLIANCE REPORT 7/6/2005 Permit to Drill 2020200 Well Name/No. MILNE PT UNIT SB 5-09 Operator BP EXPLORATION (ALASKA) INC MD 8923 TVD 4584 Completion Date 6/17/2003 Completion Status 1WINJ Current Status 1WINJ ~~-~- J-o Date: Compliance Reviewed By: API No. 50-029-23067-00-00 UIC Y i !J-f~r "-' \. -\ STATE OF ALASKA ALASK. JIL AND GAS CONSERVATION CO \¡, 1SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 0 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3346' NSL, 49' WEL, SEC. 12, T12N, R10E, UM Top of Productive Horizon: 4642' NSL, 4286' WEL, SEC. 08, T12N, R11 E, UM Total Depth: 4750' NSL, 4041' WEL, SEC. 08, T12N, R11E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x-__.565961 y-...~00q2_!~.__ Zone- ASP4 TPI: x- 571768 y- 6001365 Zone- ASP4 Total Depth: x- 572011 y- 6001475 Zone- ASP4 18. Directional Survey 0 Yes 181 No 21. Logs Run: MWD , GR , RES, CCL , USIT 22, ,····'CÄSING'· Size: 20" 7" Other 5. Date Comp., Susp., or Aband. 6/17/2003 6. Date Spudded 02/21/2002 7. Date 1. D. Reached 2/25/2002 8. Elevation in feet (indicate KB, DF, etc.) KBE = 73.2' 9. Plug Back Depth (MD+TVD) 8828 + 4516 Ft 10. Total Depth (MD+TVD) 8923 + 4584 Ft 11. Depth where SSSV set N/A MD 19. Water depth, if offshore NIA MSL Revision 09/23/03 Start Injection 1 b. Well Class: o Development 0 Exploratory o Stratigraphic 181 Service 12. Permit Number 202-020 303-154 13. API Number 50- 029-23067-00-00 14. Well Number MPS-09i 15. Field and Pool Milne Point Unit I Schrader Bluff 16. Lease Designation and Serial No. ADL 380110 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) I I I ¡ :: ¡!" I, I I' , I I ' ; ,. ¡, I I , ¡ : : , ',,:':":: ," : i ;':' , 'I.': ': ' " ,:'" ~,I '; :, ; i ~ ' i :' I, I :, ,~,':: I "I Wl.!?ERFr. '1··'·GRÄoç. 92# H-40 26# L-80 CASING, LINER AND CEMENTING RECORD iSET~I I4G~:DEA¡tHI'I;'"li: , HdCE' ; ',liII . ·i', Top "I, ,',. .' ,1,BOTTal\ll',:~I?E . : 34' 112' 42" 260 sx Arctic Set (Approx.) 34' 8914' 9-7/8" 1461 sx Class 'L', 400 sx Class 'G' I ,>" ',. '.,":":' ;1,>1.,/ I:~ '.' AMOUNT. P~'L:lED,:' 23. Perforations 0Ren to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-5/8" Gun Diameter, 5 spf MD TVD MD TVD OA Sands OA Sands 8554' - 8594' 4328' - 4354' 08 Sands 08 Sands 8654' - 8684' 4395' - 4416' 26. Date First Production: I 'I.¡':' "t'U6' "NG\',ReG"tiR:6';" I SIZE DEPTH SET (MD) 2-3/8", 4.6#, L-80 (Short) 8541' 2-3/8",4.7#, L-80 (Long) 8637' 25. ·.;:,,L\Ç'I~ :F:~6TlJRE;,ÇEM!=~T'$94EEZE,ETC; DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 58 Bbls of Diesel. 2-4:.·; August 1, 2003 Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Water Injection Oll-Bsl GAs-McF PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Oll-Bsl Press. 24-HoUR RATE W A TER-BSl GAs-McF WATER-Bsl PACKER SET (MD) 8526' 8615' CHOKE SIZE GAS-Oil RATIO Oil GRAVITY-API (CORR) 27. CORE DATA,. .... ." ...,. Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or 'w~ter{åttach ~paiateJsheet, if necessary). Submit core chips; if none, state "none". None o RIG I N At" SEP 2 4 2003 Form 10-407 Revised 2/2003 ,/ CONTINUED ON REVERSE SIDE \.9 V RBDMS BfL. SEP ~ 9 A~H:i . . -. 28. .,~ NAME MD TVD 29. rORMATION TESTS Include and brielly ;:;Ùmmarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". GEOLOGIC MARKEr ) SF2_NA SBF1_NB SBE4_NC SBE2_NE SBE1_NF TSBD_OA TSBC 8242' 4164' None 8306' 4192' 8371' 4223' 8402' 4239' 8498' 4293' 8552' 4327' 8603' 4360' TSBB _ OB SBA5 8653' 4394' 8693' 4422' 'j"\Q:'O 2 4 \\)~_.t~ .:0,/ . 30. List of Attachments: 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Son~ Title Techniæl Assistant Date Cf1- Z 3- 03 MPS-09i 202-020 303-154 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number A Drilling Engineer: Matt Green, 564-5581 Permit No. I pproval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), 50 state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 2/2003 12/17/2003 12:22 PM 10f3 Bill The rate changes on the SS were a result of choke adjustments by the operator to meet injection rate targets. The decreasing rate "chatter" seen on the LS around the same time is not abnormal for the Schrader OB injectors. The OB tends to start out with comparable injectivity, then degrade over time. We've seen similar responses on the other dual completions. Tom, Just got back from vacation and read your note. "Mathews, William L" wrote: Welcome back. Thanks for the reply. Tom -----Original Message----- From: Tom Ma un de r [~0.:..~...~..!;.?..:...!::..?..~.~_~!..~.?.:.~.~.ª.~..!.:":.~~?..~..ª~.~..~..~...:....?...~..~~..!::..~...:...~}~...:...~~.~.] Sent: Wednesday, August 20, 2003 2:58 PM To: Mathews, William L Subject: Re: MPS-09i Logging Requirement Thanks, Bill Tom, Please let me know if we have approval to continue injection without performing any additional logging to determine zonal isolation -as per my original request. "Matthew's, William L" wrote: you have developed satisfactorily No further logging is needed. Bill, Sorry about that, yes the information demonstrates the necessary isolation. Tom Maunder, PE AOGCC -----Original Message----- From: Tom Ma unde r [!~.?:..~..~..!:..?...:....~..9..~_~.~..~.~.g.~..~.~.~.¢.!:~.~.~..!..~...~....~..!;.0.:.!:..~....:...~.~...:...~..?.] Sent: Wednesday, August 20, 2003 3:24 PM To: Mathews, William L Subject: Re: MPS-09i Logging Requirement Thanks Tom. ~~~J~Si:......·~.;..·..~P.~.70~..i..·..~p.~.~.ì~.g....~~9~i.7~~¢nt......... ... ~·.~..~\m¡::.·_'·'~~~~~~s.;.iYVi~li~.p}·...·F"..·.:~~~tRG!~~L.K$~~·;è¡(#n*·.· . iIJ)..a,~e:.~~q,+QAµg .20.ø:3·19:p~:·14-¡7.()Sºø· >. . . .. . .. ..... ·~mæ~~!:j~~r ........ ........ . .. . . ..... . .... .. ) ') RE:MPS-09i Logging Requirement 12/17/2003 12:22 PM 20f3 and OB sands. The job went as planned, placing an additional 17 bbls of cement behind pipe through perforations at 8594'-85961 MD. The well was OA As you might recall, this well is completed as a dual string injector (schematic attached). The April 26, 2002 cement bond log (SCMT) showed poor cement between the OA and OB injection intervals, but fair cement above the OA providing isolation from the overlying N sands. Due to the planned completion type, a cement squeeze was performed to better isolate the confirm isolation." I have some question with regard to what surveillance will be acceptible by the AOGCC. run to On the Sundry Approval for Milne well MPS-09, there was a hand written notation that reads "by July 31, a temperature or other log must be Tom, "Mathews', William L" wrote: Bill, The information you have available does seem to indicate that each string is acting independently. It appears that there was a stabilization period (not uncommon) and then a few week period of this independent operating time. I am curious about the pressure and rate changes at the end of the plot O.bmp. It appears that the pressure has been changed on the SS and the rate has come up as one would expect. The pressure on the LS looks to taper off a little, but the rate really "chatters". Look forward to your reply. Tom -----Original Message----- From: Tom Ma un de r [~,~..~:..~..~..9....:...~..?~_~~,9.:.~.:Q.~.~..!..~~~.9.:.~~.~.~...~....§...~:.?:..~.§.:...:...?:..~...:,..~.~..~.] Sent: Friday, July 25, 2003 3:37 PM To: Mathews, William L Subject: Re: MPS-09i Logging Requirement ) RE: MPS-09i Logging Requirement 12/17/2003 12:22 PM 30f3 Name: olel.bmp olel.bmp Type: Bitmap Image (image/bmp) Encoding: base64 Name: oleO.bmp oleO.bmp Type: Bitmap Image (image/bmp) Encoding: base64 Name: MPS-09 Schematic.ZIP MPS-09 Schematic.ZIP Type: Zip Compressed Data (application/x-zip-compressed) Encoding: base64 ------------------------------------------------------------------------ «MPS-09 Schematic. ZIP» Bill Mathews Schrader Bluff PE BP Exploration, Alaska 564-5476 440-8496 cell Please let me know if this will meet your approval. date. Should day to day injection surveillance indicate a problem, we can do diagnostic work from surface by monitoring wellhead pressures while selectively injecting down each string. to I would like to defer any logs on this well based on its performance Injection down both strings commenced on June 26. As you can see from the plots below, each string appears to act independently with regard to rates and pressures. then perforated and completed. ) ) RE: MPS-09i Logging Requirement Tree: CIW 2 1/16" 5M Dual strin~ ) Wellhead:11" x 2 3/8" 5M FMC dualstring M PS-09i Hanger thread 2 3/8" EUE top and IBT bottom 2" CIW-H BPV profile -)orig. KB Elev. = 73.20 Orig. GL Elev. = 29.20 20" x 34" insulated, 215 #/ft A-53 ŒÐ ' ..:..,...,....,.,...:....'..:..':...:."':'.:'::.:"'.:: ::::. ,'. ....:........'.... .... .................. . ....,. .......,...:...,..... :·.~~~~·~~í'~;~~~,,·. ~:·'(J~~~~···8~....·.. , ong Strin~ Short String I 2995' I 2-3/8" HES X-Nipple (1.875" pkg. bore) 1:1I DJ 2-3/8" HES X-Nipple (1.875" pkg. bore) I 2997' I KOP @ 380' 60+ degree from 3285' to 8365' Max. hole angle = 78 deg @ 4050-4425' Hole angle thru perfs = 49 deg 7" 26#, L-80, IBT MOD Casing (drift id = 6.151, cap.= .0383 bpf) 2-3/8",4.7 #/ft L-80, IBT tubing (drift id = 1.901, cap.=.00387 bpf) I 8484 I 2-3/8" HES X-Nipple (1.875" pkg. bore) . . III 2-3/8" HES X-Nipple (1.875" pkg. bore) I 8484' I r . X 7" Short Jt. 8479' - 8498' l~ef~1 ~:~~~,~~~" Baker "GT" Ret. dual pkr. I 8526' I 8535' I 2-3/8" HES XN-Nipple (1.875" pkg. bore) No-Go 1.791" 8541' I Tubing tail I WLEG Iml '" Perforation Summary 7" x 2-3/8" Baker "FH" Ret. pkr. 2.41" 10. I 8615' I Size Spf Interval (TVD) OA sand~ 2-3/8" HES XN-Nipple (1.875" pkg. bore) I 8627' I No-Go 1.791" 45/8" 5 8554' - 8594' 4328' - 4355' OB sands 2-3/8" Baker 'E' Hydro Trip Sub 45/8" 5 8654' - 8684' 4395' - 4416' wI 6' muleshoe pup (bottom depth) I 8637' I (1.92" pkg. bore) E E Hydro Trip Sub ELMD I 8631' I I 8828' I 8913' 7" Halliburton Float Collar PBTD 7" Halliburton float shoe ø Å¡1T":;í~~;i:' 1.75" ball. DATE 6/17/03 REV. BY COMMENTS Well squeezed and completed by Doyon 14 MILNE POINT UNIT WELL No.: S-09i API : 50-029-23067-00 Lee Hulme BP EXPLORATION (AK) oleO.bmp (BMP Image, 642x444 pixels) ) ) MPS-09 Injection - 8-09 88 WHIP - 8-09 88 Rate - 8-09 L8 WHIP -- 8-09 L8 Rate 3000 -...".--.-.-..-- k\ j 1 ~~\1' SS = short string (OA interval) LS = long string (OB interval) 2500 2000 -- ~ ~ 1500 ..,.Jl-. -...,""~ -~Áv-\J, 1'- 6 .~ :I: \ .. VfJ V ,r 1 ~I I t ì0..~,\~·Ft~~y¿.·~tm~' lll~~~'11 "-."",?",,",= ~ l~r~f.1j~'1~~~~~ ~ "~. l j ~,"yÅt"ìí'''r'N)í¥-'------~ .L.¡.uþtllL '~I/,~~\\ (I II r \ . ,I, jf\ '\J~,II I I r 1 000 -""Ji~I~ -Ii - r' . .I~ \ - ,hlr-1V~ lll,'\ I r ~,~ 500 ' ~ \~t ~ 010 6126 6128 6130 712 7/4 7/6 7/8 7f1 0 7f12 7f14 7f16 7f18 7120 7122 7124 7126 7128 1 of 1 1800 1500 1200 - "'C ~ 900 .Q - G> 1U 600 et:: 300 12/17/2003 12:23 PM 12/17/2003 12:23 PM 50000 100000 150000 200000 250000 300000 350000 Sum Injection (bbls) "I ¡ I MPS-09 I. MPS-09SS -MPS:-09LS I ) 1 of 1 +C º= 300000 J: ~ 200000 E ~ 100000 o o ...... .e 500000 CD c 400000 600000 ole1.bmp (BMP Image, 642x376 pixels) ) ) MEMORANDUM , State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Ruedrich Commissioner DATE: July 20, 2003 l \ '7? r:;7 1 1,'7.) ÐSUBJECT: Mechanical Integrity Test ,<e1¿i BPX MPU S Pad THRU: T'"Ðm Mé1undcr P.I. Supervisor FROM: Chuck Scheve Petroleum Inspector NON· CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. Well MPU 8-09 Type Inj. 8 TV.D. 4310 Tubing 1425 1425 1425 1425 Interval I P.T.D. 202-020 Type test P Test psi 1078 Casing 600 2000 1975 1975 P/F f Notes: Initial test Well MPU 8-10 Type Inj. 8 TV.D. 4109 Tubing 1500 1500 1500 1500 Interval I P.TD. 203-067 Type test P Test psi 1027 Casi ng 650 2000 1900 1900 P/F f Notes: Initial test Well MPU 8-16 Type Inj. 8 TV.D. 4070 Tubing 1250 1250 1250 1250 Interval I P.T.D. 203-065 Type test P T est psi 1018 Casing 950 2025 1950 1950 P/F f Notes: Initial test Well MPU 8-18 Type Inj. 8 TV.D. 4238 Tubing 1450 1450 1450 1450 Interval I P.T.D. 202-242 Type test P Test psi 1060 Casing 850 2000 1975 1975 P/F f Notes: Initial test Well MPU 8-26 Type Inj. 8 TV.D. 4089 Tubing 1450 1450 1450 1450 Interval I P.T.D. 203-061 Type test P Test psi 1022 Casing 1400 2500 2475 2475 P/F f Notes: Initial test Type INJ. Fluid Codes Type Test Interval F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test G = GAS INJ. P= Standard Pressure Test 4= Four Year Cycle S = SALTWATER INJ. R= Internal Radioactive Tracer Survey V= Required by Variance N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover D= Differential Temperature Test 0= Other (describe in notes) / v/ 1"/' ;./ v' Test's Details I traveled to BPXs S Pad in the Milne Point Unit and wimessed the initial MIT on the above listed 5 wells that were recently placed on injection. The pretest tubing and casing pressures were observed and found to be stable. The pressure tests were then performed with all wells demonstrating good mechanical integrity. M.I.T.'s pertormed: ~ Attachments: Number ot Failures: º Total Time during tests: 4 hours cc: MIT report form 5/12/00 L.G. 2003-0720_MIT _MPU_S-26_cs.xls 7/23/2003 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ) '.) 1. Status of Well o Oil 0 Gas D Suspended 0 Abandoned 181 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3346' NSL,491 WEL, SEC. 12, T12N, R10E, UM At top of productive interval 4642' NSL, 4286' WEL, SEC. 08, T12N, R11 E, UM X = 571768, Y = 6001365 10. Well Number At total depth 4750' NSL, 4041' WEL, SEC. 08, T12N, R11E, UM X = 572011, Y = 6001475 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff KBE = 73.2' ADL 380110 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 2/21/2002 / 2/25/2002 / 6/17/2003 ./ 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 8923 4584 FT 8828 4516 FT 181 Yes D No 22. Type Electric or Other Logs Run MWD, GR, RES, CCL, US IT Classification of Service Well Water Injection 7. Permit Number 202-020 303-154 8. API Number 50- 029-23067 -00 9. Unit or Lease Name X = 565961, Y = 6000014 Milne Point Unit MPS-09i 15. Water depth, if offshore 16. No. of Completions NIA MSL One 20. Depth where SSSV set 21. Thickness of Permafrost N/A MD 1800' (Approx.) 23. CASING SIZE 20" 7" WT. PER FT. 92# 26# GRADE H-40 L-80 CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE CEMENTING RECORD 34' 112' 42" ~60 sx Arctic Set (Approx.) 34' 89141 9-7/8" 1461 sx Class ILl, 400 sx Class 'G' AMOUNT PUllED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-5/8" Gun Diameter, 5 SPF MD TVD MD TVD OA Sands OA Sands 25. TUBING RECORD SIZE DEPTH SET (MD) 2-3/81" 4.6#, L-80 (Short) 85411 2-3/8",4.7#, L-80 (Long) 8637' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 58 Bbbls of Diesel. PACKER SET (MD) 85261 86151 8554' - 8594' 43281 - 4354' OB Sands OB Sands 8654' - 8684' 4395' - 4416' 27. Date First Production Not On Injection Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) NIA PRODUCTION FOR Oll-BBl TEST PERIOD GAs-McF WATER-BBl CHOKE SIZE GAS-Oil RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE ?8. CORE DATA Brief description of lithology, porosity, fractu~es, appare~t dips and presence of oil, gas or water. Submit core C~ips. Oll-BBl GAs-McF WATER-BBl Oil GRAVITY-API (CORR) 1: ~I , . I:~ -,':,"";:' l 1 .: . / ..: .'~: 3U , ~L ·_l.'1.:~_.c ~J' .~~~... 2 2 .; ,0;1 .. '': "n03 .......: L~.J {,I J, No core samples were taken. '\ Form 10-407 Rev. 07-01-80 ORIGINAL Submit In Duplicate ) ) 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. SF2_NA 8242' 4164' SBF1_NB 8306' 4192' SBE4_NC 8371' 4223' SBE2_NE 8402' 4239' SBE1_NF 8498' 4293' TSBD_OA 8552' 4327' TSBC 8603' 4360' TSBB_OB 8653' 4394' SBA5 8693' 4422' Ji ~' !Fl ,,,lit 1. ¡j ?OD3 31. List of Attachments: Summary of Daily Drilling Reports, Surveys, Post Rig Work Summary. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Sondra ~~ Title Technical Assistant Date Ol~l7-Ò) M PS-09i Well Number 202-020 303-154 Permit No. I Approval No. Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Matt Green, 564-5581 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 OR\G\NAL ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-09 MPS-09 DRILL +COMPLETE NABORS ALASKA DRILLING I NABORS 27E Start: 2/20/2002 Rig Release: 2/28/2002 Rig Number: 27E Spud Date: 2/21/2002 End: 2/28/2002 . Date FrOm ~ To NPT Phase Descri ptionofQperations 2/19/2002 18:00 - 00:00 6.00 MOB P PRE MOVE RIG FROM S-31 i-TO S-09i - MOVE PIPE SHEDS - MOTOR MODULE - PUMP MODULE ,. PIT MODULE - MOVE SUB MODULE OFF WELL MPS-31 i 2/20/2002 00:00 - 08:00 8.00 RIGU P PRE FINISH MOVING RIG FROM S-31 ¡TO S-09i - WELL TO WELL IN LINE MOVE - RELEASE TRUCKS AT 0800 HRS 08:00 - 15:00 7.00 RIGU P PRE HOOK UP ALL SERVICE LINES, BUILD BERMS AND SET CUTTING TANK, GET STEAM TO ALL UNITS ACCEPT RIG AT 1500 HRS 2/20/2002 15:00 - 20:00 5.00 BOPSURP INT1 NIPPLE UP 20" DIVERTER SYSTEM WITH 16" LINE - INSTALL 4" WASH OUT VALVES ON CONDUCTOR PIPE 20:00 - 21 :30 1.50 BOPSURP INT1 CUT AND SLIP 170' DRILL LINE 21 :30 - 22:00 0.50 BOPSUR P INT1 SERVICE TOP DRIVE 22:00 - 23:00 1.00 BOPSURP INT1 ACTIVATE ACCUMULATOR - FUNCTION DIVETER SYSTEM - VERIFY DIVERTER OPERATION 23:00 - 00:00 1.00 BOPSURP INT1 PICK UP 5" DRILL PIPE FROM PIPE SHED - DRIFT DRILL PIPE 2/21/2002 00:00 - 05:00 5.00 BOPSUR P INT1 PU 5" DP FROM PIPE SHED - RABBIT EACH JOINT 05:00 - 06:00 1.00 BOPSUR P INT1 PREFORM FUNCTION TEST DIVERTER - ACCUMULATOR TEST WITH AOGCC WITNESS JEFF JONES. 06:00 - 08:00 2.00 BOPSUR P INT1 CON'T PU 5" DP FROM PIPE SHED 08:00 - 08:30 0.50 BOPSUR P INT1 PRE SPUD MEETING 08:30 - 09:00 0.50 BOPSUR P INT1 TOP DRIVE SERVICE - RIG SERVICE 09:00 - 11 :30 2.50 DRILL P INT1 PU BHA - LOAD MWD 11 :30 - 12:00 0.50 DRILL P INT1 SURFACE TEST ALL MUD EQUIPMENT 12:00 - 00:00 12.00 DRILL P INT1 DIRECTIONAL DRILL FROM 112' TO 1099' - SPUD WELL IN AT 12:00 HRS - WOB 10K TO 25K - RPM 80 - TQ 3K - PP 1150 - GPM 375 - PU 85K - SO 85K - ROT 85K - ECD 9.54 2/22/2002 00:00 - 00:00 24.00 DRILL P INT1 DIRECTIONAL DRILLING - FROM 1099' TO 3637' - WOB 20K TO 30K - RPM 80 - TQ 8K TO 9K - GPM 400 - PP 1450 - ECD 10.1 - PU 120K - SO 105K - ROT 115K 2/23/2002 00:00 - 03:30 3.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3637' TO 4076' - WOB 20K TO 25K - RPM 100 - TQ 9K TO 10K - GPM 400 - PP 1450 - PU 140K - SO 90 K - ROT 110K - ECD 10.17 03:30 - 05:00 1.50 DRILL P INT1 CIRCULATE 2 X BU - 6000 STKS - FOR BIT TRIP- SHAKERS CLEAN 05:00 - 07:30 2.50 DRILL P INT1 PUMP OUT OF HOLE FROM 3919' TO 817' -100 STKS PER MIN - 1300 PSI - NO PROBLEMS 07:30 - 08:00 0.50 DRILL P INT1 LD 12 JOINTS 5" HEVI-WEIGHT DP 08:00 - 11 :30 3.50 DRILL P INT1 CHANGE BIT'S - DOWN LOAD MWD - CHANGE MOTOR FROM 1.5 TO 1.22 - UP LOAD MWD - TIH W / BHA - TEST MWD 11 :30 - 12:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 12:00 - 14:30 2.50 DRILL P INT1 RIH FROM 456' TO 4076' - TIGHT HOLE AT 1700' TO 2000' WORK THROUGH - REAM THROUGH BRIDGE 1850' TO 1870' - TIGHT TO 1990' - NO OTHER PROBLEMS ON TIH 14:30 - 00:00 9.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4076' TO 5809' - WOB 30K TO 35K - RPM 120 - TQ 10K - GPM 500 - PP 2200 - PU 152K- SO 80K - ROT 115K - ECD 10.6 2/24/2002 00:00 - 10:00 10.00 DRILL P INT1 DIRECTIONAL DRILL FROM 5809' TO 6815' - WOB 30K TO 40K - RPM 120 - TQ 12K TO 14K - GPM 500 - PP 2450 - ECD 10.22 - PU 170K - SO 100K - ROT 120K 10:00 - 13:00 3.00 DRILL P INT1 CIRCULATE 14000K STKS FOR WIPER TRIP - STAND BACK ONE STAND EVERY 30 MINS - ROTATE 120 RPM Printed: 6/23/2003 11 :29:49 AM ') ) BPEXPLORÄ'fION .QperationsSummªry . Report · Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-09 MPS-09 DRILL +COMPLETE NABORS ALASKA DRILLING I NABORS 27E Date FrÖm·-.To HÖÜrs Task Code NPT Phase 2/24/2002 10:00 - 13:00 3.00 DRILL P INT1 13:00 - 18:30 5.50 DRILL P INT1 18:30 - 19:30 1.00 DRILL P INT1 19:30 - 20:30 1.00 DRILL N RREP INT1 20:30 - 00:00 3.50 DRILL P INT1 2/25/2002 00:00 - 00:30 0.50 DRILL P INT1 00:30 - 19:00 18.50 DRILL P INT1 19:00 - 23:30 4.50 DRILL P INT1 23:30 - 00:00 0.50 DRILL P INT1 2/26/2002 00:00 - 03:30 3.50 DRILL P INT1 03:30 - 04:00 0.50 DRILL P INT1 04:00 - 04:30 0.50 DRILL P INT1 04:30 - 08:30 4.00 DRILL P INT1 08:30 - 11 :30 3.00 DRILL P INT1 11 :30 - 15:30 4.00 DRILL P INT1 15:30 - 18:00 2.50 DRILL P INT1 18:00 - 18:30 0.50 DRILL P INT1 18:30 - 20:00 1.50 CASE P INT1 20:00 - 20:30 0.50 CASE P INT1 20:30 - 00:00 3.50 CASE P INT1 2/27/2002 00:00 - 06:30 6.50 CASE P INT1 06:30 - 07:30 1.00 CASE P INT1 07:30 - 08:00 0.50 CEMT P INT1 08:00 - 10:30 2.50 CEMT P INT1 10:30 - 14:00 3.50 CEMT P INT1 Start: 2/20/2002 Rig Release: 2/28/2002 Rig Number: 27E Spud Date: 2/21/2002 End: 2/28/2002 Descri ption of Operations AND RECIPROCATE PIPE - 500 GPM PUMP OUT OF HOLE FROM 6468' TO 456' - WORKED THROUGH TIGHT SPOTS FROM 2500' TO 1750' PUMPING OUT - WORKING BACK UP AND DOWN WITHOUT PUMP ON THE 2ND WIPE ON EACH STAND LUBRICATE RIG - TOP DRIVE - DRAWWORKS CHANGE CLUTCH ENGAGE VALVE ON DRAWWORKS- CHANGE DIES IN TOP DRIVE GRIPPER RIH FROM 456' TO 6090' - BRIDGE @ 1777' -1817' -1950'- BACK REAM FROM 1850' TO 1777' - 1955' TO 1932' - CON'T RIH - NO OTHER PROBLEMS CON'T RIH FROM 6090' TO 6815' DIRECTIONAL DRILL FROM 6815' TO 8923' - WOB 30K- RPM 120 - TQ 14K - GPM 500 - PP 2650 - ECD 10.26 - PU 198K - SO 90K - ROT 135K CBU 4 X FOR WIPER CONDITION TRIP FOR RUNNING 7" CASING - STAND BACK STAND EVERY 30 MINS WHILE CIRC - SHAKERS CLEAN WIPER TRIP - MONITOR WELL - POH FROM 8530' TO 8188' - TIGHT ATTEMPT TO WORK THROUGH - BACK REAM FROM 8190' TO 8140' - CON'T POH - PU WITH OUT PUMP 205 - SO 85 POOH - HOLE IN EXCELLENT SHAPE FROM 8100' NO PROBLEMS PULL TO 456' CLEAN RIG FLOOR RIG SERVICE - TOP DRIVE SERVICE RIH FROM 456' TO 8923' - TIGHT 7890' - WORK TROUGH - FILLING EVERY 25 STANDS CBU 4 X - 24000 STKS - CONDITION MUD TO RUN CASING -130 STKS - 550 GPM - RPM 120 - ROTATE 1 RECIPROCATE STRING WHILE CIRC POH TO RUN CASING FROM 8923' TO 456' BHA. NO PROBLEMS PULLING OUT OF HOLE. LAY DOWN BHA - DOWN LOAD MWD CLEAR - CLEAN FLOOR RIG UP CASING EQUIPMENT - HOLD SAFETY MEETING PJSM (ON RUNNING CASING) PU SHOE JOINT - RUNNING 7" CASING - 55 JOINTS PICKED UP AT 00:00 HRS RUNNING 7" CASING - LAND CASING ON HANGER - SO 75K - RAN 215 JOINTS 26# BTC L-80 CIRCULATE AND CONDITION HOLE WITH FRANK'S FILL UP TOOL AT 80 SPM - 338 GPM - 300 PSI. RIGGED DOWN FILL UP TOOL AND RIGGED UP CEMENTING HEAD WITH WASH UP LINE. CIRCULATE AND CONDITION HOLE FOR CEMENT JOB. 80 SPM - 338 GPM - 300 PSI. PUMP 5 BBLS WATER - TEST LINES TO 3500 PSI - PUMP 45 BBLS WATER -PUMPED 50 BBLS OF 10.2 PPG ALPHA SPACER WITH RED DYE - DROPPED BOTTOM PLUG WITH LAST 5 BBLS OF SPACER - MIXED AND PUMPED 1460 SXS (1080 BBLS) OF CLASS L CEMENT MIXED IN A 10.7 PPG SLURRY WITH A YIELD OF 4.15 CFT/SX. PUMPED LEAD Printed: 6/23/2003 11 :29:49 AM ) ') BP··EXPLORATION Qp~rélti()ns S.Ûrnrnary RèPØrt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-09 MPS-09 DRILL +COMPLETE NABORS ALASKA DRILLING I NABORS 27E Date From.. To Hours Task ·Code· NPT Phase 2/27/2002 10:30 -14:00 3.50 CEMT P INT1 14:00 - 15:30 INT1 1.50 CEMT P 15:30 - 16:00 16:00 - 17:00 17:00 - 00:00 0.50 CEMT P 1.00 CEMT P 7.00 CEMT N INT1 INT1 SFAL INT1 2/28/2002 2.00 CASE N SFAL INT1 00:00 - 02:00 02:00 - 03:30 03:30 - 08:00 1.50 BOPSUR P 4.50 WHSUR P INT1 INT1 08:00 - 11 :00 3.00 WHSUR P INT1 11 :00 - 20:00 9.00 DRILL P INT1 20:00 - 21 :00 1.00 DRILL P INT1 21 :00 - 23:30 2.50 DRILL P INT1 23:30 - 00:00 0.50 DRILL P INT1 6/12/2003 08:00 - 08:30 0.50 MOB P CaMP 08:30 - 09:30 1.00 MOB P CaMP 09:30 - 10:30 1.00 MOB P CaMP 10:30 - 11 :30 1.00 WHSUR P CaMP 11 :30 - 12:00 0.50 WHSUR P CaMP 12:00 - 14:30 2.50 BOPSUR P CaMP 14:30 - 15:30 1.00 BOPSUR P CaMP 15:30 - 16:00 0.50 BOPSUR P CaMP 16:00 - 19:00 3.00 BOPSUR P CaMP Start: 2/20/2002 Rig Release: 2/28/2002 Rig Number: 27E Spud Date: 2/21/2002 End: 2/28/2002 Description of Operations CEMENT UNTIL LEAD CEMENT WAS SEEN AT SURFACE. MIXED AND PUMPED 400 SXS (81 BBLS) PREMIUM CEMENT + 1 % CALCIUM CHLORIDE + .3% HALAD 344 + .2% CFR-3 MIXED IN AT 15.8 PPG SLURRY WITH A YIELD OF 1.15 CFT/SX. WASHED OUT LINES. DROPPED TOP PLUG. DISPLACE CEMENT WITH 220 BBLS OF 11.0 PPG BRINE AND 116 BBLS OF DIESEL. PUMPED PLUG WITH 2840 PSI (1000 PSI OVER CIRCULATING) AT 1520 HRS. HAD FULL RETURNS THROUGHOUT CEMENTING JOB. HAD 419 BBLS OF CEMENT TO SURFACE. FLUSHED DIVERTER WITH FRESH WATER. RIG DOWN CASING EQUIPMENT ATTEMPT TO BACK OUT LANDING JOINT - RIG UP RIG TONG FOR BACK UP ON HANGER IN CELLER - RIG UP POWER TONGS IN CELLER TO ATTEMPT TO BACK OUT LANDING JOINT - NO SUCCESS - ATTEMPT TO USE RIG TONG ON FLOOR AND POWER TONGS IN CELLER - CRUSHED LANDING JOINT ON RIG FLOOR WITH RIG TONGS RIG DOWN POWER TONGS IN CELLER - RIG UP RIG TONGS IN CELLER - BACK OUT LANDING JOINT - LAY DOWN LANDING JOINT - THREADS SEVERL Y GALLED ON BOTTOM THREADS OF RUNNING TOOL AND HANGER NIPPLE DOWN DIVERTER NIPPLE UP GEN 6 WELLHEAD - TEST VOID 1000 PSI. TEST FAILED. PULLED WELLHEAD AND CHANGED a-RING. INSTALLED GEN 6 WELLHEAD. TEST VOID TO 1000 PSI FOR 10 MINUTES. GOOD TEST. INSTALL TUBING HEAD AND 7" TOP VALVE. RIGGED UP TO TEST. HELD PJSM ON TESTING CASING AND WELLHEAD. RIGGED UP HB&R. TESTED WELLHEAD AND CASING TO 4500 PSI FOR 30 MINUTES AND RECORDED ON CHART. BLED OFF PRESSURE. AND INSTALLED BPV. PRESSURE TESTED BPV TO 1000 PSI FOR 30 MINUTES AND RECORDED ON CHART. HELD PJSM ON LAYING DOWN DRILL PIPE. LAID DOWN 5" DRILL PIPE FROM DERRICK IN MOUSEHOLE. UNLOAD 5" DP FROM PIPE SHED CUT DRLG LINE SERVICE TOP DRIVE AND RIG - RELEASE RIG AT 23:59 HRS ON 02-28-2002 Skid rig floor to move position Move rig from well 26i to well 09i Skid rig floor to drlg position - Rig up floor - Accept rig 10:30 hrs on 6/12/2003 Take on Brine - Nipple down tree - Nipple down tubing spool - Nipple up Dual Tubing spool Make dummy run with Dual hanger halves Nipple up BOP's - Make up double annulus valve Change out top rams from Dual 2 3/8" to 2 7/8" X 5" variable Rig up BOP testing equipment Test BOP's - Annular 250 low 3500 high 5 mins each test - Top Printed: 612312003 11 :29:49 AM ') ) laP' EXPLORATION Opøré1tion$'$U:nlrtíary .Rep:ort Page4of6 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-09 MPS-09 DRILL +COMPLETE NABORS ALASKA DRILLING I NABORS 27E Start: 2/20/2002 Rig Release: 2/28/2002 Rig Number: 27E Spud Date: 2/21/2002 End: 2/28/2002 Date From-To Hours Task Code NPT . Phase Description of Operations· 6/12/2003 16:00 - 19:00 3.00 BOPSUR P COMP Rams / Bottom Rams / Blind Rams / Choke Manifold / Upper - Lower IBOP valves - Floor / Dart valves - Hyd Choke / Kill valves - Manual Choke / Kill valves - 250 low 3500 high - 5 mins each test - all test were good - John Crisp with AOGCC witnessed the test 19:00 - 19:30 0.50 BOPSUR P COMP Rig down testing equipment - Pull test plug - Install wear ring - Close annulus valves 19:30 - 20:30 1.00 CLEAN P COMP Make up HTC AT J-4 6.125" bit - 7" 26# casing scraper - Bit sub (with float installed) - 12 / 4 3/4" dcs - XO 20:30 - 22:30 2.00 CLEAN P COMP RIH with 4" singles to 3180' 22:30 - 23:30 1.00 CLEAN P COMP Break circulation - Displace out freeze protection (diesel) from well with 8.9 ppg Brine - GPM 357 - PP 1000 - Shut down for 30 mins letting diesel migrate - Pump additional 15 bbls - Brine cleaned up - Recovered 110 bbls of diesel for recycle 23:30 - 00:00 0.50 CLEAN P COMP Con't RIH with 4" singles from 3180' to 3540' 6/13/2003 00:00 - 04:30 4.50 CLEAN P COMP Con't RIH with 4" singles from 3450' to 8828' float collar 04:30 - 05:00 0.50 CLEAN P COMP Break circulation - Displace 11 ppg brine from well with 8.9 ppg brine - GPM 360 - PP 2800 - Reciprocate - RPM 77 - TQ 7K to 8K 05:00 - 05:30 0.50 CLEAN P COMP Cut Drlg Line - Rig Service - Top Drive service 05:30 - 06:00 0.50 CLEAN P COMP Test 7" casing to 3500 psi for 30 mins - ok 06:00 - 06:30 0.50 CLEAN P COMP Spot 9.5 bbl Hi-Vis pill on bottom 06:30 - 08:30 2.00 CLEAN P COMP POH with clean out BHA 08:30 - 10:00 1.50 CLEAN P COMP LID BHA - PJSM - Make up Howco EZSV Perf gun 10:00 - 14:00 4.00 PERF P COMP RIH with EZSV Perf gun to 8596' - Perforate 7" casing @ 8594' to 8596' 14:00 - 15:00 1.00 PERF P COMP Set EZSV - test Annulus to 1000 psi - Pressure up to 2300 psi with 1000 psi on annulus - fire perf gun - Injection rate 1.5 bpm @ 1080 psi - Shear off packer @ 60K over string weight - Rotate right 25 turns - Sting back into packer - re-establish injection rate of 1.5 bpm 1080 psi - unsting from packer - Close annular - Open choke - Take returns through choke 15:00 - 17:30 2.50 CEMT P COMP PJSM - Pump 5 bbls water - Test lines to 3500 psi - Mix and spot 20 bbls 15.8# premium cement followed by 5 bbls of water and 61 bbls displacement - holding 400 psi back pressure on choke while spotting cement to packer - Sting into retainer - squeezed 5 bbls water 11 bbls cement at 1 bpm @ 1000 psi - Slowed pumps to .5 bpm squeezed additional 6 bbls cement @ 1060 psi - held pressure for 5 mins with final pressure @ 1060 psi - unsting from retainer - left 3 bbls cement on top of retainer 17:30 - 19:00 1.50 CEMT P COMP Pull out of hole 2 stands @ 8400' - Reverse out 2 drill pipe volumes 180 bbls at 6 bpm 1000 psi - Then circ 2 bottoms up conventional at 7 bpm @ 1500 psi 19:00 - 22:00 3.00 CEMT P COMP POH with running tools 22:00 - 23:00 1.00 CEMT P COMP Lay down running tool - Make up clean out BHA - Bit - 2 Junk Baskets - bit sub with float - 12 / 43/4" dcs - xo 23:00 - 00:00 1.00 CEMT P COMP RIH with clean out assembly to 3266' 6/14/2003 00:00 - 01 :30 1.50 CEMT P COMP Con't RIH with clean out assembly from 3266' to 8432' 01 :30 - 03:30 2.00 CEMT P COMP Circ vis up mud for drilling cement retainer and cement - Load pipe shed with 2 3/8" tubing for completion - 03:30 - 07:00 3.50 CEMT P COMP RIH tag up @ 8536' - Drill cement / retainer / guns from 8536' to 8828' float collar. Printed: 6/23/2003 11 :29:49 AM ) '> E3p··EXPLORATION OperationsSumnlétryReport Page 5 of6 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: M PS-09 MPS-09 DRILL +COMPLETE NABORS ALASKA DRILLING I NABORS 27E Start: 2/20/2002 Rig Release: 2/28/2002 Rig Number: 27E Spud Date: 2/21/2002 End: 2/28/2002 Date Frorn- To Hours Task ·Code NPT ... Phase Oescri ptionof. Operations 6/14/2003 07:00 - 08:00 1.00 CEMT P COMP Pump Hi-vis sweep - Displace with clean 8.9# Brine 08:00 - 10:30 2.50 CEMT P COMP POH with clean out assembly - Recovered +- 1.5 pounds of junk from J-baskets 10:30 - 11 :00 0.50 CEMT P COMP Lay down BHA - Clear rig floor 11 :00 - 13:00 2.00 PERF P COMP PJSM - Pick up Howco perforating guns and BHA 13:00 - 15:00 2.00 PERF P COMP RIH with Howco perforating guns - Taking weight @ 3900' - Work down hole to 4100' 15:00 - 16:30 1.50 PERF P COMP POH with Howco guns for scraper run 16:30 - 18:00 1.50 PERF P COMP PJSM - Lay down - BHA - Howco perforating guns 18:00 - 19:30 1.50 CLEAN P COMP Pick up 6.125" bit - 7" 26# scaper - 2 Junk baskets - 12 4 3/4" dcs - jars - 5 hwdp - xo 19:30 - 23:00 3.50 CLEAN P COMP RIH to 8825' - Encountered junk @ 3887', 3925', 3966',4008', 4089',4131',4213',4253',4421',4499',4667',4702' - Set down weight from 20K to 30K - Work each spot till clean - From 4702' to 8825' no other junk was encountered - Hole clean 23:00 - 00:00 1.00 CLEAN P COMP POH for perforating guns @ 7000' 6/15/2003 00:00 - 02:00 2.00 CLEAN P COMP POH with clean out assembly from 7000' to BHA - No overpulls seen on trip out - Hole in good shape - Lay down bha - Recovered +- 3 pounds of junk from J-baskets 02:00 - 02:30 0.50 PERF P COMP PJSM - Handling Howco guns - Clear rig floor 02:30 - 03:00 0.50 PERF P COMP Pick up Howco perforating guns - BHA 03:00 - 07:00 4.00 PERF P COMP RIH with Howco guns to 8701'. 07:00 - 11 :30 4.50 PERF P COMP Held PJSM with rig crew and Schlumberger. Rigged up wireline and started in hole with 1-11/16" 00 GR/CCL to 3700'. Pumped and worked tool down hole pumping 4BPM @ 450 psi to annular pressure crossover at 8505'. Logged up to 7980' and confirmed correlation. Pulled out of hole with logging tools. Rigged down wireline. 11 :30 - 12:00 0.50 PERF P COMP Pulled up hole 13.5' to set guns on depth. Set champ packer and closed annular. Pressured up on annulus to 3000 psi and held for 1 minute. Bled off pressure and opened annular perventor. Gun fired. Perforated 'OA' from 8554' - 8594' and 'OB" from 8654' - 8684', Shot 5 shots/ft with 60 degree phasing. Released champ packer and hole took approximately 2 bbls. 12:00 - 12:30 0.50 PERF P COMP Pulled two stands of drill pipe and monitored well with hole fill. Hole stable. Pulled out of hole with guns. 12:30 -15:00 2.50 PERF P COMP Pull out of hole with Howco guns 15:00 - 16:30 1.50 PERF P COMP PJSM - Lay down bha - Howco perforating gun assembly - (all shots fired) 16:30 - 17:00 0.50 PERF P COMP Clear rig floor of all Howco tools 17:00-17:30 0.50 CLEAN P COMP Make up clean out BHA - Bit - 7" 26# casing scraper - 2 J-baskets - Bit sub - 12 4 3/4" dc's - jars - 5 3 1/2" hwdp - xo 17:30 - 20:30 3.00 CLEAN P COMP RIH to 8650' - (No tight spots seen on trip in) 20:30 - 00:00 3.50 CLEAN P COMP Pull out of hole laying down drill pipe 6/16/2003 00:00 - 02:00 2.00 CLEAN P COMP Lay down Drill pipe from 2900' to bha 02:00 - 02:30 0.50 CLEAN P COMP Lay down BHA 02:30 - 03:30 1.00 RUNCOfvP COMP Change top rams to 2 3/8" dual rams - Change bails - rig up dual commpletion equipment - 03:30 - 04:30 1.00 RUNCOfvP COMP Test top rams to 250 low 3500 high 5 mins each test - floor safety valves 250 low 3500 high 5 mins - rig down test joint - pull test plug 04:30 - 05:00 0.50 RUNCOfvP COMP PJSM - Run 2 3/8" Dual completion - Pick up packers tail pipe assembly make up - same Printed: 6/23/2003 11 :29:49 AM ,) ) Page6of6 ·BPEXPLORATION OperationsStunl11~.ry .·Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-09 MPS-09 DRILL +COMPLETE NABORS ALASKA DRILLING I NABORS 27E Date From ~To Hours Task Code NPT Phase 6/16/2003 05:00 - 16:00 11.00 RUNCOrvP COMP 16:00-21:00 5.00 RUNCOrvP COMP 21 :00 - 22:30 1.50 RUNCOrvP COMP 22:30 - 23:00 0.50 WHSUR P COMP 23:00 - 00:00 1.00 BOPSUR P COMP 6/17/2003 00:00 - 01 :00 1.00 BOPSURP COMP 01 :00 - 03:00 2.00 WHSUR P COMP 03:00 - 05:00 2.00 CHEM P COMP 05:00 - 09:00 4.00 RUNCOrvP COMP 09:00 - 10:00 1.00 RUNCOrvP COMP Start: 2/20/2002 Rig Release: 2/28/2002 Rig Number: 27E Spud Date: 2/21/2002 End: 2/28/2002 Description of Operations Running 2 3/8" Dual assembly - hanging up on junk +/- 5930' - con't running tubing pushing junk to 8650' PJSM - Rig up Schlumberger E-Line for correlation to set packers on depth - RIH with GR/CCL for correlation - RIH to 3600' - start pumping tool down 1/4 bpm at 900 psi - tool stuck in XN nipple - pulling 3400 line tension - 1000 over shear out of rope socket - work tool free - correlate packers on depth - poh with CCLlGR - Rig down Schlumberger Space out - land tubing - PU 120K - SO 65K RILDS - Lay down landing joints - Test TWC to 1000 psi from above Change top Dual Rams to 27/8" X 5" variable Nipple down BOP's Nipple up adapter flange - Dual tree - test to 5K for 10 mins - Pull TWC's Circulating Clean Brine - Reverse circulate corexit in well for corrision protection - Pump 58 bbls diesel in annulus for freeze protection - Drop 1 3/4" steel ball on Long string pumping ball to seat with rig pump - BPM .5 - PP 1120 - Ball on seat - set packers - test string to 3000 psi for 30 mins - shear out ball with 3900 psi - Test annulus to 2000 psi for 30 mins - Drop ball in short string - pump ball on seat with rig pump 1 1/2 bpm 2000 psi - Ball on seat - test short string to 3000 psi for 30 mins - Shear out ball with 3700 psi - Install BPV's - Rig down lines - Secure well - Release rig At 10:00 hrs on 6/17/2003 Printed: 6/23/2003 11 :29:49 AM ) ) Well: Field: API: Permit: MPS-09i Milne Point Unit 50-029-23067 -00 202-020 Accept: Spud: Release: RiQ: 02/20103 02/21/03 06/17/03 D-14 POST-RIG WORK 06/17/03 ARRIVED LOCATION, HELD PRE-JOB SAFETY MEETING, PRESSURE TESTED TO 3000 PSI. START DOWN THE SHORT STRING WITH 8 BBLS DIESEL @ .4 BPM WI 1150 PSI MAX. SWITCHED TO LONG STRING AND PUMPED 8 BBLS DIESEL @ .2 BPM WI 1200 PSI MAX. RATES WERE HINDERED BY THE BACK PRESSURE VALVE AND REQUIREMENT TO KEEP INJECTION PSI BELOW 1200. 06/20/03 PERFORM SBHP SURVEY'S ON BOTH STRINGS, PULLED RHC FROM SHORT STRING. ON THE SHORT STRING THE SBHP WAS TAKEN @ 4087' WLM (4107' MD) DUE TO INABILITY TO WORK THE GAUGES DOWN THE WELLBORE. 06/26/03 OPEN ALL BLANKETS, CHOKES, AND BLOCK VALVES. INSURED MAIN HEADER VALVE WAS SHUT IN AND BOTH WING VALVES WERE SHUT. PRESSURED UP ON INJECTION LINES HOLDING AT 500 PSI. GOOD TEST. BROUGHT PRESSURE UP TO 2000-PSI GOOD TEST. BROUGHT PRESSURE UP TO 3650-PSI GOOD TEST. BLED BACK PRESSURE OFF INJECTION LINES. ') AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPS-09 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00' MD 'MD (if applicable) 8,923.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) aOd-O~O ) 18-Mar-02 RECEIVED t..~ .~ Q f) 0 "DO? I ,:"\.. L L _ Alaska Oil & Gas Cons. Commission Anchorage DE¡:INIT/~ BP EXPLORA TION (ALASKA) INC. E Milne Point Unit BPXA MPS-Pad, Slot MPS-09 MPS-09 Job No. AKZZ22033, Surveyed: 25 February, 2002 c_~ SURVEY REPORT 15 March, 2002 Your Ref: API 500292306700 Surface Coordinates: 6000013.87 N, 565960.74 E (70024' 37.7149" N, 149027'46.4250" W) Kelly Bushing: 73.2Oft above Mean Sea Level c_. 5ï-..=i'~""'Y-!5U" DRILLING SERViceS A Halliburton Company Survey Ref: svy10067 Sperry-Sun Drilling Services . Survey Report for MPS-09 )EF N TIVE Your Ref: API 500292306700 Job No. AKZZ22033, Surveyed: 25 February, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit MPS-Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) r /1 OOft) 0.00 0.000 0.000 -73.20 0.00 O.OON O.OOE 6000013.87 N 565960.74 E 0.00 AK-6 BP _'FR-AK 201.85 0.600 272.410 128.65 201.85 0.04 N 1.06W 6000013.91 N 565959.68 E 0.297 -1.02 292.78 0.650 161.220 219.57 292.77 0.42 5 1.37W 6000013.43 N 565959.38 E 1.135 -1.43 384.11 2.460 130.050 310.87 384.07 2.185 0.30 E 6000011.70 N 565961.06 E 2.117 -0.19 476.50 5.370 139.160 403.03 476.23 6.725 4.65E 6000007.19 N 565965.45 E 3.211 3.05 -. 565.16 8.090 143.580 491.07 564.27 14.885 11.07 E 5999999.08 N 565971.94 E 3.121 7.50 656.57 11 .990 145.610 581.07 654.27 27.905 20.25 E 5999986.15 N 565981.24 E 4.283 13.58 747.93 14.500 143.170 669.99 743.19 44.89 5 32.47 E 5999969.27 N 565993.60 E 2.814 21.74 840.91 14.750 138.980 759.96 833.16 63.145 47.22 E 5999951.15 N 566008.51 E 1.169 32.09 936.89 16.820 138.800 852.32 925.52 82.81 5 64.38 E 5999931.64 N 566025.85 E 2.157 44.49 1030.16 19.070 141.500 941 .04 1014.24 104.895 82.76 E 5999909.72 N 566044.42 E 2.571 57.53 1124.64 19.450 142.600 1030.24 1103.44 129.46 5 101.92E 5999885.31 N 566063.80 E 0.556 70.79 1217.35 21.370 140.940 1117.12 1190.32 154.84 5 121.94E 5999860.11 N 566084.05 E 2.163 84.70 1311 .79 22.160 142.130 1204.83 1278.03 182.26 5 143.72 E 5999832.88 N 566106.06 E 0.958 99.88 1406.16 24.110 138.480 1291.61 1364.81 210.755 167.43 E 5999804.61 N 566130.02 E 2.564 116.70 1499.31 26.330 139.420 1375.88 1449.08 240.69 5 193.48 E 5999774.90 N 566156.34 E 2.422 135.49 1593.69 26.680 138.830 1460.34 1533.54 272.53 5 221.04 E 5999743.30 N 566184.18 E 0.464 155.34 1686.52 29.680 140.250 1542.16 1615.36 305.90 5 249.47 E 5999710.18 N 566212.90 E 3.311 175.68 1781.31 29.850 140.790 1624.44 1697.64 342.22 5 279.38 E 5999674.13 N 566243.14 E 0.335 196.83 1876.66 33.750 142.270 1705.46 1778.66 381.575 310.61 E 5999635.06 N 566274.70 E 4.171 218.58 1968.63 40.270 140.990 1778.87 1852.07 424.92 5 344.99 E 5999592.01 N 566309.4 7 E 7.138 242.53 ~ 2063.56 41.070 137.030 1850.88 1924.08 471.595 385.56 E 5999545.70 N 566350.45 E 2.846 271.79 2156.60 42.140 131.260 1920.47 1993.67 514.555 429.88 E 5999503.13 N 566395.14 E 4.274 305.51 2250.13 43.320 127.200 1989.19 2062.39 554.65 5 479.03 E 5999463.47 N 566444.65 E 3.204 344.58 2343.89 43.270 122.070 2057.45 2130.65 591.175 531.89 E 5999427.42 N 566497.83 E 3.752 388.07 2436.84 43.330 116.810 2125.12 2198.32 622.48 5 587.37 E 5999396.60 N 566553.59 E 3.881 435.25 2524.84 44.170 108.150 2188.75 2261.95 645.67 5 643.50 E 5999373.91 N 566609.92 E 6.868 484.87 2624.63 44.800 102.770 2259.96 2333.16 664.285 710.85 E 5999355.90 N 566677.43 E 3.829 546.44 2717.64 45.400 97.740 2325.64 2398.84 675.98 5 775.64 E 5999344.76 N 566742.32 E 3.884 607.04 2810.99 46.340 91.110 2390.67 2463.87 681.12 5 842.38 E 5999340.22 N 566809.10 E 5.195 670.99 - ------------------- -------- 15 March, 2002 - 7:29 Page 2 0'6 DrillQuest 2.00.09.003 Sperry-Sun Drilling Services . Survey Report for MPS-09 Your Ref: API 500292306700 Job No. AKZZ22033, Surveyed: 25 February, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit MPS-Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 2906.60 47.530 87.130 2455.97 2529.17 680.02 S 912.19 E 5999341.93 N 566878.90 E 3.286 739.32 3001 .14 50.560 86.880 2517.93 2591.13 676.29 S 983.48 E 5999346.29 N 566950.16 E 3.211 809.67 3094.77 52.960 86.690 2575.88 2649.08 672.16 S 1056.90 E 5999351.07 N 567023.53 E 2.568 882.18 3188.95 55.990 85.100 2630.60 2703.80 666.66 S 1133.34 E 5999357.25 N 567099.92 E 3.498 957.95 3284.82 60.440 82.190 2681.09 2754.29 657.59 S 1214.29 E 5999367.03 N 567180.79 E 5.310 1038.90 ~ 3378.67 64.290 79.650 2724.62 2797.82 644.44 S 1296.36 E 5999380.90 N 567262.74 E 4.751 1121.85 3472.59 67.160 76.860 2763.24 2836.44 626.99 S 1380.16 E 5999399.09 N 567346.38 E 4.083 1207.43 3565.76 70.190 73.880 2797.12 2870.32 605.06 S 1464.11 E 5999421.77 N 567430.14 E 4.410 1294.16 3661.68 73.410 69.820 2827.09 2900.29 576.65 S 1550.66 E 5999450.93 N 567516.43 E 5.237 1384.84 3754.94 74.490 66.970 2852.88 2926.08 543.65 S 1633.97 E 5999484.67 N 567599.45 E 3.157 1473.39 3849.45 74.830 66.420 2877.88 2951.08 507.59 S 1717.68 E 5999521.47 N 567682.83 E 0.667 1562.99 3945.28 75.830 66.130 2902.15 2975.35 470.29 S 1802.55 E 5999559.51 N 567767.37 E 1.084 1654.01 4050.96 77.910 66.450 2926.15 2999.35 428.91 S 1896.77 E 5999601.73 N 567861.23 E 1.990 1755.05 4146.43 77.800 66.960 2946.24 3019.44 392.00 S 1982.50 E 5999639.39 N 567946.62 E 0.535 1846.81 4239.26 77.790 66.940 2965.86 3039.06 356.48 S 2065.98 E 5999675.65 N 568029.79 E 0.024 1936.09 4331.39 77.730 66.890 2985.40 3058.60 321.18 S 2148.81 E 5999711.68 N 568112.30 E 0.084 2024.67 4423.46 74.540 66.920 3007.46 3080.66 286.12 S 2231.02 E 5999747.47 N 568194.20 E 3.465 2112.60 4515.55 73.620 66.740 3032.72 3105.92 251.27 S 2312.44 E 5999783.03 N 568275.31 E 1.017 2199.70 4608.76 73.480 66.040 3059.11 3132.31 215.47 S 2394.35 E 5999819.55 N 568356.90 E 0.736 2287.50 4702.87 73.770 66.610 3085.64 3158.84 179.21 S 2477.04 E 5999856.54 N 568439.27 E 0.658 2376.16 4796.22 73.760 67.000 3111.74 3184.94 143.91 S 2559.42 E 5999892.57 N 568521.33 E 0.401 2464.31 - 4890.82 74.250 67.240 3137.81 3211.01 108.56 S 2643.21 E 5999928.66 N 568604.80 E 0.573 2553.83 4984.73 74.250 66.780 3163.30 3236.50 73.26 S 2726.41 E 5999964.70 N 568687.69 E 0.471 2642.78 5080.28 74.720 66.470 3188.86 3262.06 36.73 S 2810.92 E 6000001.97 N 568771.88 E 0.583 2733.28 5176.19 74.430 66.720 3214.37 3287.57 O.OON 2895.77 E 6000039.44 N 568856.40 E 0.393 2824.14 5271.00 74.100 66.200 3240.08 3313.28 36.44 N 2979.43 E 6000076.63 N 568939.74 E 0.632 2913.79 5364.14 74.390 66.450 3265.37 3338.57 72.44 N 3061.53 E 6000113.34 N 569021.51 E 0.405 3001.82 5457.87 74.380 66.660 3290.60 3363.80 108.36 N 3144.35 E 6000149.99 N 569104.01 E 0.216 3090.52 5552.72 73.400 65.780 3316.92 3390.12 145.10 N 3227.74 E 6000187.47 N 569187.07 E 1.365 3179.97 5645.72 73.240 66.960 3343.61 3416.81 180.81 N 3309.35 E 6000223.90 N 569268.36 E 1.228 3267.46 ------------- 15 March, 2002 - 7:29 Page 30f6 DrillQuest 2.00.09.003 Sperry-Sun Drilling Services . Survey Report for MPS-D9 Your Ref: API 500292306700 Job No. AKZ222033, Surveyed: 25 February, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit MPS-Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1000) 5741.03 72.830 67.790 3371.42 3444.62 215.88 N 3393.50 E 6000259.71 N 569352.20 E 0.937 3357.28 5833.19 72.500 67.330 3398.88 3472.08 249.46 N 3474.81 E 6000294.00 N 569433.21 E 0.596 3444.00 5926.69 72.320 66.680 3427.14 3500.34 284.27 N 3556.85 E 6000329.55 N 569514.94 E 0.690 3531.71 6019.74 71.640 67.460 3455.93 3529.13 318.75 N 3638.35 E 6000364.74 N 569596.13 E 1.081 3618.81 6116.30 73.480 67.160 3484.86 3558.06 354.28 N 3723.33 E 6000401.02 N 569680.80 E 1.928 3709.55 ~~ 6210.63 73.980 67.040 3511.29 3584.49 389.52 N 3806.75 E 6000436.99 N 569763.90 E 0.544 3798.69 6306.15 73.480 66.990 3538.05 3611.25 425.33 N 3891.16 E 6000473.54 N 569847.99 E 0.526 3888.93 6397.51 73.310 65.930 3564.16 3637.36 460.29 N 3971.43 E 6000509.22 N 569927.95 E 1.127 3974.94 6492.76 73.250 65.270 3591.57 3664.77 497.98 N 4054.50 E 600054 7 .63 N 570010.68 E 0.667 4064.28 6586.93 73.570 65.110 3618.45 3691.65 535.85 N 4136.42 E 6000586.23 N 570092.27 E 0.377 4152.55 6681.93 73.710 65.350 3645.21 3718.41 574.04 N 4219.19 E 6000625.15 N 570174.69 E 0.284 4241.71 6776.20 73.820 63.930 3671.57 3744.77 612.80 N 4300.97 E 6000664.63 N 570256.13 E 1.451 4330.04 6871 . 1 3 74.260 64.740 3697.67 3770.87 652.33 N 4383.24 E 6000704.89 N 570338.05 E 0.942 4419.01 6966.16 74.890 64.880 3722.95 3796.15 691.32 N 4466.13 E 6000744.61 N 570420.59 E 0.678 4508.4 7 7060.05 74.670 64.220 3747.60 3820.80 730.25 N 4547.94 E 6000784.26 N 570502.05 E 0.718 4596.86 7155.56 74.860 63.930 3772.69 3845.89 770.54 N 4630.82 E 6000825.28 N 570584.57 E 0.354 4686.60 7248.77 74.830 64.130 3797.06 3870.26 809.94 N 4711.70 E 6000865.39 N 570665.11 E 0.210 4774.19 7342.14 74.490 65.360 3821.76 3894.96 848.35 N 4793.14 E 6000904.52 N 570746.20 E 1.322 4862.10 7431.99 74.030 65.840 3846.14 3919.34 884.08 N 4871.89 E 6000940.94 N 570824.64 E 0.726 4946.80 7530.69 74.140 65.770 3873.20 3946.40 922.98 N 4958.47 E 6000980.61 N 570910.87 E 0.131 5039.84 7619.90 75.270 65.400 3896.73 3969.93 958.55 N 5036.83 E 6001016.86 N 570988.90 E 1.328 5124.12 7711.20 74.800 65.580 3920.31 3993.51 995.14 N 5117.08 E 6001054.16 N 571068.83 E 0.549 5210.47 7806.58 73.980 64.730 3945.98 4019.18 1033.74 N 5200.44 E 6001093.49 N 571151.85 E 1.215 5300.30 7899.73 71 .990 65.650 3973.23 4046.43 1071.11 N 5281.28 E 6001131.58 N 571232.36 E 2.336 5387.41 7992.23 72.330 66.250 4001.57 4074.77 1107.00 N 5361.69 E 6001168.18 N 571312.45 E 0.719 5473.76 8089.02 70.560 66.660 4032.37 4105.57 1143.65 N 5445.81 E 6001205.57 N 571396.24 E 1.872 5563.90 8180.00 67.100 67.140 4065.22 4138.42 1176.94 N 5523.83 E 6001239.54 N 571473.96 E 3.835 5647.35 8273.59 63.880 67.060 4104.04 4177.24 1210.07 N 5602.27 E 6001273.37 N 571552.10 E 3.441 5731.17 8364.67 60.430 67.620 4146.58 4219.78 1241.09 N 5676.57 E 6001305.05 N 571626.13 E 3.827 5810.49 8458.69 55.390 67.930 4196.51 4269.71 1271.22 N 5750.28 E 6001335.82 N 571699.57 E 5.368 5889.04 -~-----.--- 15 March, 2002 - 7:29 Page 4 0'6 DrillQuest 2.00.09.003 Sperry-Sun Drilling Services Survey Report for MPS-09 Your Ref: API 500292306700 Job No. AKZZ22033, Surveyed: 25 February, 2002 . BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit MPS-Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 8554.46 49.260 66.650 4255.02 4328.22 1300.44 N 5820.18 E 6001365.66 N 571769.21 E 6.487 5963.67 8649.05 46.650 66.170 4318.36 4391.56 1328.54 N 5884.55 E 6001394.33 N 571833.33 E 2.785 6032.66 8742.45 45.900 66.530 4382.92 4456.12 1355.62 N 5946.38 E 6001421.95 N 571894.92 E 0.850 6098.94 8836.97 44.920 65.850 4449.27 4522.4 7 1382.79 N 6007.96 E 6001449.66 N 571956.26 E 1.156 6165.01 8855.07 44.710 65.850 4462.11 4535.31 1388.01 N 6019.60 E 6001454.98 N 571967.85 E 1.160 6177.51 ~ 8923.00 44.710 65.850 4510.39 4583.59 1407.56 N 6063.21 E 6001474.92 N 572011.28 E 0.000 6224.36 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.052° (21-Feb-02) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 77.230° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 8923.00ft., The Bottom Hole Displacement is 6224.45ft., in the Direction of 76.930° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 8923.00 4583.59 1407.56 N 6063.21 E Projected Survey - ----- -~~-- -- . 15 March, 2002 - 7:29 Page 50f6 DrillQlIest 2.00.09.003 BP EXPLORATION (ALASKA) INC. Milne Point Unit Survey tool program for MPS-09 From Measured Vertical Depth Depth (ft) (ft) 0.00 15 March, 2002 - 7:29 Sperry-Sun Drilling Services Survey Report for MPS-09 Your Ref: API 500292306700 Job No. AKZZ22033, Surveyed: 25 February, 2002 . BPXA MPS-Pad To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 4583.59 AK-6 BP _IFR-AK ~. 8923.00 '-.~ Page 60f6 DrillQuesf 2.00.09.003 ) AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-09 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00' MD 'MD (if applicable) 8,923.00' MD d Od-tOó1 0 ) 18-Mar-02 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED t,.~ ~ D I) 0 r:OO? I ,:"\., L L - Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA MPS-Pad, Slot MPS-09 MPS-09 MWD - Job No. AKMW22033, Surveyed: 25 February, 2002 SUR VE Y R E PO R T 15 March, 2002 Your Ref: 500292306700 Surface Coordinates: 6000013.87 N, 565960.74 E (70024' 37.7149· N, 149027'46.4250" W) Kelly Bushing: 73.200 above Mean Sea Level 55i..--1 ......y-SUI! ÞAILL.ING SERVices A Halliburton Company Survey Ref: svy10081 Sperry-Sun Drilling Services . Survey Report for MPS-09 MWD Your Ref: 500292306700 Job No. AKMW22033, Surveyed: 25 February, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit MPS-Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastings Northings Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 GOft) 0.00 0.000 0.000 -73.20 0.00 O.OON O.OOE 6000013.87 N 565960.74 E 0.00 MWD Magnetic 201.85 0.600 272.330 128.65 201.85 0.04 N 1.06W 6000013.90 N . 565959.68 E 0.297 -1.02 292.78 0.650 161.150 219.57 292.77 0.43 8 1.37W 6000013.43 N 565959.38 E 1.135 -1.43 384. 11 2.460 130.190 310.87 384.07 2.188 0.30E 6000011.69 N 565961.06 E 2.115 -0.19 476.50 5.370 139.380 403.03 476.23 6.748 4.63 E 6000007.17 N 565965.43 E 3.212 3.02 '- 565.16 8.090 143.680 491.07 564.27 14.928 11.03 E 5999999.05 N 565971.90 E 3.118 7.46 656.57 11.990 145.870 581.07 654.27 27.97 8 20.17 E 5999986.08 N 565981.15 E 4.286 13.49 747.93 14.500 143.300 669.99 743.19 45.00 8 32.33 E 5999969.16 N 565993.47 E 2.821 21.58 840.91 14.750 139.050 759.96 833.16 63.27 8 47.04 E 5999951.02 N 566008.34 E 1.185 31.90 936.89 16.820 139.060 852.32 925.52 82.99 8 64.15 E 5999931.45 N 566025.62 E 2.157 44.22 1030.16 19.070 141.810 941.04 1014.24 105.168 82.42 E 5999909.44 N 566044.08 E 2.577 57.14 1124.64 19.450 142.740 1030.24 1103.44 129.81 8 101.49 E 5999884.96 N 566063.37 E 0.517 70.28 1217.35 21.370 141.170 1117.12 1190.32 155.26 8 121.42 E 5999859.69 N 566083.53 E 2.153 84.10 1311.79 22.160 142.340 1204.83 1278.03 182.768 143.09 E 5999832.38 N 566105.44 E 0.954 99.16 1406.16 24.110 138.640 1291.61 1364.81 211.328 166.71 E 5999804.03 N 566129.31 E 2.576 115.87 1499.31 26.330 139.590 1375.88 1449.08 241.348 192.68 E 5999774.24 N 566155.54 E 2.422 134.56 1593.69 26.680 139.070 1460.34 1533.54 273.28 8 220.13 E 5999742.54 N 566183.27 E 0.445 154.27 1686.52 29.680 140.330 1542.16 1615.36 306.73 8 248.46 E 5999709.35 N 566211.90 E 3.295 174.51 1781.31 29.850 140.890 1624.44 1697.64 343.108 278.32 E 5999673.25 N 566242.08 E 0.344 195.60 1876.66 33.750 142.420 1705.46 1778.66 382.51 8 309.45 E 5999634.10 N 566273.56 E 4.176 217.25 1968.63 40.270 141.210 1778.87 1852.07 425.98 8 343.69 E 5999590.94 N 566308.18 E 7.133 241.03 2063.56 41.070 137.040 1850.88 1924.08 472.728 384.17 E 5999544.56 N 566349.07 E 2.984 270.18 2156.60 42.140 131.110 1920.48 1993.68 515.638 428.54 E 5999502.05 N 566393.81 E 4.384 303.96 2250.13 43.320 126.180 1989.20 2062.40 555.21 8 478.09 E 5999462.90 N 566443.72 E 3.792 343.54 2343.89 43.270 121.980 2057.45 2130.65 591.228 531.32 E 5999427.36 N 566497.26 E 3.072 387.49 2436.84 43.330 114.830 2125.14 2198.34 621.51 8 587.32 E 5999397.57 N 566553.52 E 5.274 435.41 2524.84 44.170 109.030 2188.73 2261.93 644.198 643.73 E 5999375.39 N 566610.13 E 4.655 485.41 2624.63 44.800 103.590 2259.95 2333.15 663.80 8 710.79 E 5999356.38 N 566677.37 E 3.871 546.49 2717.64 45.400 97.690 2325.64 2398.84 675.93 8 775.49 E 5999344.81 N 566742.17 E 4.538 606.90 2810.99 46.340 91.450 2390.67 2463.87 681.24 8 842.21 E 5999340.10 N 566808.94 E 4.901 670.80 -------.- 15 March, 2002 - 7:29 Page 20f6 DrillQuest 2.00.09.003 Sperry-Sun Drilling Services . Survey Report for MPS-D9 MWD Your Ref: 500292306700 Job No. AKMW22033, Surveyed: 25 February, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit MPS-Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 2906.60 47.530 87.370 2455.97 2529.17 680.49 5 912.03 E 5999341.46 N 566878.75 E 3.356 739.06 3001.14 50.560 87.090 2517.93 2591.13 677.045 983.34 E 5999345.54 N 566950.02 E 3.213 809.36 3094.77 52.960 86.640 2575.88 2649.08 673.01 5 1056.76 E 5999350.22 N 567023.40 E 2.591 881.86 3188.95 55.990 84.730 2630.60 2703.80 667.22 5 1133.18 E 5999356.68 N 567099.77 E 3.616 957.67 3284.82 60.440 81.860 2681.09 2754.29 657.665 1214.07 E 5999366.95 N 567180.57 E 5.293 1038.67 -~ 3378.67 64.290 79.610 2724.62 2797.82 644.25 S 1296.10 E 5999381.09 N 567262.48 E 4.619 1121.64 3472.59 67.160 76.230 2763.23 2836.43 626.31 5 1379.79 E 5999399.77 N 567346.01 E 4.483 1207.23 3565.76 70.190 72.970 2797.12 2870.32 603.25 5 1463.44 E 5999423.57 N 567429.45 E 4.604 1293.90 3661.68 73.410 68.650 2827.09 2900.29 573.28 5 1549.45 E 5999454.30 N 567515.19 E 5.438 1384.41 3754.94 74.490 66.730 2852.87 2926.07 539.25 5 1632.36 E 5999489.05 N 567597.80 E 2.292 1472.79 3849.45 74.830 65.960 2877.88 2951.08 502.68 5 1715.84 E 5999526.36 N 567680.95 E 0.864 1562.29 3945.28 75.830 66.140 2902.15 2975.35 465.05 5 1800.56 E 5999564.74 N 567765.34 E 1.059 1653.23 4050.96 77.910 66.120 2926.15 2999.35 423.41 5 1894.67 E 5999607.21 N 567859.08 E 1.968 1754.22 4146.43 77.800 66.630 2946.24 3019.44 386.00 5 1980.18 E 5999645.37 N 567944.26 E 0.535 1845.88 4239.26 77.790 66.700 2965.86 3039.06 350.06 5 2063.49 E 5999682.04 N 568027.25 E 0.074 1935.08 4331.39 77.730 66.600 2985.39 3058.59 314.385 2146.16 E 5999718.46 N 568109.59 E 0.124 2023.58 4423.46 74.540 66.660 3007.45 3080.65 278.93 5 2228.20 E 5999754.63 N 568191.32 E 3.465 2111.43 4515.55 73.620 66.570 3032.71 3105.91 243.78 5 2309.48 E 5999790.50 N 568272.29 E 1.003 2198.47 4608.76 73.480 65.880 3059.11 3132.31 207.745 2391.29 E 5999827.26 N 568353.77 E 0.726 2286.22 4702.87 73.770 66.470 3085.64 3158.84 171.275 2473.89 E 5999864.46 N 568436.04 E 0.676 2374.84 4796.22 73.760 66.890 3111.74 3184.94 135.795 2556.19 E 5999900.66 N 568518.03 E 0.432 2462.95 4890.82 74.250 67.090 3137.81 3211.01 100.24 5 2639.90 E 5999936.95 N 568601.42 E 0.556 2552.44 4984.73 74.250 66.510 3163.30 3236.50 64.63 5 2722.97 E 5999973.29 N 568684.17 E 0.594 2641.33 5080.28 74.720 66.420 3188.86 3262.06 27.875 2807.38 E 6000010.79 N 568768.26 E 0.500 2731.78 5176.19 74.430 66.690 3214.37 3287.57 8.91 N 2892.20 E 6000048.33 N 568852.75 E 0.406 2822.63 5271.00 74.100 66.210 3240.08 3313.28 45.38 N 2975.86 E 6000085.53 N 568936.08 E 0.599 2912.28 5364.14 74.390 66.510 3265.37 3338.57 81.32 N 3057.98 E 6000122.19 N 569017.88 E 0.439 3000.31 5457.87 74.380 66.230 3290.60 3363.80 117.50 N 3140.68 E 6000159.11 N 569100.26 E 0.288 3088.97 5552.72 73.400 65.280 3316.92 3390.12 154.92 N 3223.76 E 6000197.26 N 569183.01 E 1.412 3178.27 5645.72 73.240 66.830 3343.61 3416.81 191.08 N 3305.18 E 6000234.13 N 569264.10 E 1.606 3265.66 - --- - ~--- - - ---- - ---.------- 15 March, 2002 - 7:29 Page 30f6 Dril/Quesf 2.00.09.003 . ,. . . Sperry-Sun Drilling Services' ,- .., Survey Report for MPS-09 MWD Your Ref: 500292306700 Job No. AKMW22033, Surveyed: 25 February, 2002 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit MPS-Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 5741.03 72.830 67.460 3371.42 3444.62 226.48 N 3389.19 E 6000270.28 N 569347.79 E 0.765 3355.42 5833.19 72.500 66.650 3398.88 3472.08 260.78 N 3470.20 E 6000305.29 N 569428.50 E 0.912 3442.01 5926.69 72.320 66.620 3427.14 3500.34 296.13 N 3552.02 E 6000341.36 N 569510.00 E 0.195 3529.61 6019.74 71.640 66.850 3455.92 3529.12 331.08 N 3633.31 E 6000377.02 N 569590.98 E 0.768 3616.62 6116.30 73.480 66.750 3484.86 3558.06 367.37 N 3717.98 E 6000414.06 N 569675.33 E 1.908 3707.21 - 6210.63 73.980 66.360 3511.29 3584.49 403.40 N 3801.05 E 6000450.82 N 569758.08 E 0.662 3796.20 6306.15 73.480 66.290 3538.05 3611.25 440.21 N 3885.03 E 6000488.38 N 569841.73 E 0.528 3886.24 6397.51 73.310 65.640 3564.16 3637.36 475.87 N 3964.99 E 6000524.74 N 569921.37 E 0.707 3972.10 6492.76 73.250 64.720 3591.56 3664.76 514.16 N 4047.78 E 6000563.76 N 570003.82 E 0.927 4061.31 6586.93 73.570 64.740 3618.45 3691.65 552.69 N 4129.40 E 6000603.01 N 570085.09 E 0.340 4149.42 6681.93 73.710 65.040 3645.21 3718.41 591.37 N 4211.94 E 6000642.42 N 570167.29 E 0.337 4238.47 6776.20 73.820 63.630 3671.57 3744.77 630.57 N 4293.51 E 6000682.34 N 570248.52 E 1 .441 4326.70 6871.13 7 -1.260 64.480 3697.67 3770.87 670.50 N 4375.59 E 6000722.99 N 570330.23 E 0.978 4415.56 6966.16 74.890 64.920 3722.94 3796.14 709.65 N 4458.41 E 6000762.87 N 570412.70 E 0.799 4504.99 7060.05 74.670 63.620 3747.59 3820.79 748.98 N 4540.02 E 6000802.92 N 570493.97 E 1.356 4593.27 7155.56 74.860 63.660 3772.69 3845.89 789.90 N 4622.59 E 6000844.56 N 570576.17 E 0.203 4682.85 7248.77 74.830 64.010 3797.06 3870.26 829.57 N 4703.34 E 6000884.95 N 570656.57 E 0.364 4770.37 7342.14 74.490 65.150 3821.76 3894.96 868.22 N 4784.66 E 6000924.31 N 570737.55 E 1.232 4858.22 7431.99 74.030 65.450 3846.14 3919.34 904.36 N 4863.23 E 6000961.14 N 570815.79 E 0.604 4942.84 7530.69 74.140 64.930 3873.20 3946.40 944.19 N 4949.39 E 6001001.73 N 570901.59 E 0.519 5035.67 7619.90 75.270 64.220 3896.73 3969.93 981.13 N 5027.10 E 6001039.36 N 570978.98 E 1.481 5119.62 .- 7711.20 74.800 64.620 3920.31 3993.51 1019.21 N 5106.66 E 6001078.14 N 571058.20 E 0.666 5205.63 7806.58 73.980 64.420 3945.97 4019.17 1058.73 N 5189.58 E 6001118.39 N 571140.77 E 0.883 5295.24 7899.73 71.990 65.160 3973.23 4046.43 1096.67 N 5270.17 E 6001157.04 N 571221.02 E 2.267 5382.22 7992.23 72.330 65.280 4001.57 4074.77 1133.58 N 5350.11 E 6001194.65 N 571300.63 E 0.388 5468.34 8089.02 70.560 65.910 4032.37 4105.57 1171.49 N 5433.67 E 6001233.30 N 571383.85 E 1.930 5558.21 8180.00 67.100 66.750 4065.22 4138.42 1205.55 N 5511.35 E 6001268.05 N 571461.23 E 3.899 5641 .50 8273.59 63.880 66.860 4104.04 4177.24 1239.09 N 5589.62 E 6001302.28 N 571539.19 E 3.442 5725.24 8364.67 60.430 67.380 4146.58 4219.78 1270.40 N 5663.80 E 6001334.24 N 571613.10 E 3.821 5804.51 8458.69 55.390 67.920 4196.51 4269.71 1300.69 N 5737.44 E 6001365.18 N 571686.47 E 5.383 5883.03 . ------ ._------- 15 March, 2002 - 7:29 Page 4 of6 DríllQuest 2.00.09.003 Sperry-Sun Drilling Services Survey Report for MPS-09 MWD Your Ref: 500292306700 Job No. AKMW22033, Surveyed: 26 February, 2002 . BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit MPS-Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 8554.46 49.260 66.840 4255.02 4328.22 1329.80 N 5807.39 E 6001394.91 N 571756.16 E 6.463 5957.68 8649.05 46.650 66.640 4318.36 4391.56 1357.54 N 5871.92 E 6001423.22 N 571820.44 E 2.764 6026.75 8742.45 45.900 67.220 4382.92 4456.12 1383.99 N 5934.02 E 6001450.21 N 571882.30 E 0.920 6093.15 8836.97 44.920 65.960 4449.27 4522.47 1410.73 N 5995.79 E 6001477.49 N 571943.84 E 1.406 6159.31 8855.07 44.710 65.760 4462.11 4535.31 1415.94 N 6007.43 E 6001482.81 N 571955.43 E 1.397 6171.81 -' 8923.00 44.710 65.760 4510.39 4583.59 1435.56 N 6051.01 E 6001502.82 N 571998.83 E 0.000 6218.65 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.040° (07-Mar-02) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section Is from Well and calculated along an Azimuth of 77.230° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 8923.00ft., The Bottom Hole Displacement is 6218.96ft., in the Direction of 76.654° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment -. 8923.00 4583.59 1435.56 N 6051.01 E Projected Survey - -------~ 15 March, 2002 - 7:29 Page 50f6 DrillQuest 2.00.09.003 BP EXPLORATION (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Survey Report for MPS-D9 MWD Your Ref: 500292306700 Job No. AKMW22033, Surveyed: 25 February, 2002 . BPXA MPS-Pad Survey tool program for MPS-09 MWD From Measured Vertical Depth Depth (ft) (ft) '-- 0.00 15 March, 2002 - 7:29 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 8923.00 4583.59 MWD Magnetic '~ ~v - - --- - . - -- ----- Page 6 of6 DrillQuest 2.00.09.003 MPS-09 (202-020) ) S'ubject: MPS-09 (202-020) Date: Wed, 28 May 2003 09:50:29 -0800 From: Tom Maunder <tom_maunder@admin.state.ak.us> To: Matt Green <greenmd@bp.com> CC: Pat Archey <archeypj@bp.com> Matt, I have received the sundry application to squeeze and complete MPS-09 as well as the daily report and a portion of the bond log that you faxed. I have also looked at the hard copy of the SCMT log from our file. It is clear why it is proposed to squeeze between the OA and OB. The cement map presentation does show that there is cement in place, however the quality of the cement is not spectacular. The cement map does show that there is better quality cement above the OA and given the "better" interval length, it is likely that there is isolation above the OA. We have discussed that the reasoning for BP not planning a subsequent bond log was the success you achieved on a similar well out there. I believe you said the well was S-11. I will finalize your request and forward for the Commissioner's approval. One condition of the approval will be that after the well is placed in service, a temperature log or other evaluation log of BP's choice should be run to verify the isolation between the sands and above the OA. Given that you are squeezing the well to give isolation between the sands, I don't believe that requiring a follow on evaluation log is an undo burden. Thanks for providing the additional information on this well. Please call with any questions. Tom Maunder, PE AOGCC A....'.." A.n.N ......1. ............... ........w ............" ..v .~~-_....._--_......., .. Tom Maunder <tom maunder@admin.state.ak.us> Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 1 of 1 ) 5/28/2003 12:28 PM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL ') ) ~56~ ¡;J~ 5;1z:- ~' L~ c-"' a -- z> r::> Z 8' (J~ 181 Perforate 181 Other Run Dual Completion 1. Type of Request: 0 Abandon 0 Suspend 0 Plugging 0 Time Extension o Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance o Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of well: o Development o Exploratory o Stratigraphic 181 Service 6. Datum Elevation (DF or KB) KBE = 73.2' 7. Unit or Property Name Milne Point Unit 2. Name of Operator BP Exploration (Alaska) Inc. 4. Location of well at surface 3346' NSL,49' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 4643' NSL, 4286' WEL, SEC. 08, T12N, R11 E, UM At effective depth" 8. Well Number MPS-09i 9. Permit Number 202-020 10. API Number 50- 029-23067-00 11. Field and Pool Milne Point Unit I Schrader Bluff At total depth 4750' NSL, 4041' WEL, SEC. 08, T12N, R11E, UM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Structural Conductor Surface Intermediate Production Liner 8923 feet Plugs (measured) 4584 feet 8828 feet Junk (measured) 4516 feet Length Size Cemented MD TVD 78' 20" 260 sx Arctic Set (Approx.) 112' 112' 8880' 7" 1461 sx Class 'L', 400 sx Class 'G' 8914' 4577' Casing Perforation depth: measured None RECEIVED MAY 2 7 2003 true vertical Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None Alaska Oil & Gas Cons. Commission Anchorage 13. Attachments 181 Description Summary of Proposal o Detailed Operations Program 15. Status of well classifications as: o Oil 0 Gas 0 Suspended o BOP Sketch 14. Estimated date for commencing operation June 2, 2003 16. If proposal was verbally approved Service Water Injection Name of approver Contact Engineer Name/Number: Matt Green, 564-5581 17. ~~;~:y :::~h::at t(J3ga::L;correct to ~~~e be~~~!o~~~~~:I:~~neer , . '... ,'ConnnlsSlonl:Jse Only Conditions of Approval: Notify Commission so representative may witness ß" .\~\'ì ~ \ C. Plug integrity _ BOP Test ~ Location clearance _ ~~"'~'?-~~'~ Mechanical Integrity Test ~ Subsequent f~rm required 10- ,",,0'\ O'\C'"~'\a'-.~..:h;\ ~~-.;)\'.~.::::. ~~,~ \~c\c..\\c", "~.. .. Approved by orœr of the Commission r.KJ /" nf)' "- ~_ . ForWtili§~F~/15/88 MAY 2 9 ZUUð L LA..-./~\;f '__ Date Approved Prepared By Name/Number: Sandra Stewman, 564-4750 Date S /2 "2/03 I Approval No. ':) (- '?-; .~ I c.s L\ .~S\:)() ~s\ ""'-,,,\~,,"'- ~a~~-\- Date 1~~ Submit In TriPKc~te Commissioner ) ) MPS-09 Dual Completion Pre-Rig Work 1. None. Scope of Work: 1. MIRU Doyon 14. 2. ND Tree. NU BOPE. 3. RIH to TD and displace well to kill weight brine. POH. 4. RIH with perforation guns and EZSV packer. 5. Set packer, perforate 2-ft interval between OA and OB sands, squeeze 10-bbl cement, POH. 6. RIH with bit and scraper. Drill out packer and cement. Clean out well. POH. 7. Run duaI2.375-in completion as per attached schematic 8. ND BOPE. NU dual 2-1/16" 5M CIW Tree. 9. Freeze protect well 10. RDMO Tree:Cameron Gen 6 , Wellhead: 'J " I , 5M 20" 92# ppf, H-40 I 113' I MPU S-09i A ) Orig. DF Elev. = 68.00 Orig. GL Elev. = 39.20 KOP @ 400' 0 7" Tam Port Collar I 981' Max. hole angle = 77.8 deg @4050' Hole angle thru' perfs = . 7" 26#, L-80, BTRC Casing . (drift 10 = 6.151, cap.= .0383 bpf) Perforation Summary Size Spf Interval DATE 03/03/02 REV. BY MOO 3000' of diesel 11.0# Brine (TVD) .. ~ COMMENTS Orilled by Nabors 27-E Short joints 8478' - 8498' 7" Halliburton Float Collar 8828' 7" Halliburton float shoe 8913' MILNE POINT UNIT WELL No.: S-09i API : 50-029-23067-00 BP EXPLORATION (AK) Proposed OA Perfs 8554- 8594' MD Proposed OB Perfs 8654- 8684' MD !?," j r~ '¡, ~ .!f : 1 '~ ~ ~ '{ '8 "1 t, :I i ~\¡.. -(f 'I ~ . t ~' ~ g 4 t = " t :! ,~ J! . 1 I r ~: ,I 't .~ I' i ¡ J ~ .~ I t J [. ,¡ ,~ ¡ ~ I ¡, :< I', i . , t f' t :; ~' i ~, ~ 1 j ri ~ t r "~ t ~ '1 :~~ .:; I:, ~ " " t .., r ~' t r '1 ...~ ) ) Proposed MPS-09i dual string completior 20" 92# H-40 WELDED CONDUCTOR @ 113' MD/TVD 7.0-in TAM port collar @ 981-ft 2-3/8" 'X' nipples (set at - 2200' MD) 2-3/8" 4.7# L80 IBT tubing strings 7" X 2-3/8" Baker GT dual packer (set at - 8525' MD) 2-3/8" 4.7# L80 IBT pup jt (-10') 2-3/8" 'X' nipple with 1.875" no-go 2-3/8" 4.7# L80 IBT pup jt (-10') Re-entry guide 7" X 2-3/8" Baker FH packer (set at -8615' MD) 2-3/8" 4.7# L80 IBT pup jt (-10') 2-3/8" 'X' nipple with 1.875" no-go 2-3/8" 4.7# L80 IBT pup jt (-10') Re-entry guide 7" 26# L-80 BT&C @ 8913' MD/4578' TVD 2-3/8" Dual Strings with dedicated OA and 08 injection. ') , ) 'dO) --O·;}-O MECHANICAL INTEGRITY REPORT' '... =?UD DAIE: :)/-';) \-"0 d~' :. .I G R E L E}.6 S ::;: . .;; I"';) 'is .- t::) "}. OPER Ex FIELD ,~"V \-,\,\ ",G.. '~fC)~\"- \- WELL NmiBER \--'\ V ~ - 0<;"\ """" . '1.\ Casi~g: \ I'D: <G~J') Jill.. '-\S"'ð\-\ TVD; :?BTD: <6"~ MI? '--\5\ ~ TVD Shoe: «s~\t.\ MD ~S'\\ TVD i DV: N ~ HD ·Tvu ~~ t;LL DATA ~:":1e"!:": N ~ Shoe: ~~ \ r '-.)..' '-(, tt. \--- :\..loi::g: Packe!:' MD TVD j :OP: r·m :VD HI) TVD i Set ê. t <is <0 S" L\ <is <0 ~ Y ,<J \S P L ~L.o erI.5 ~Sç L..{ ~C;-'~ ~ ta Þ-... \>\C>......,,~ ~'-.)<>-. \ \~~ ~0\C:>~ CO~\<è\\<:>~ C'\I{',,'\~ ::ole S:"z e \ "b ana ~I\ ~CF..Þ_NIC;'-L INTEGRITY - PART ¡ 1 Annulus Press Test: :l:.P ¿;2ÒDD; 15 min \~")ç-; 30 min \~"Ç . Co=en ts : M \ T ~\-\-'N!:.,»(;cJ ~ c:.. k\.)~ k S:..~'-.)<è .... /"de -<J '> ,..- ~~\~~ \~'S\,<!.'d "\-o '-\S(JC)Ç>S\ ~,,\~\-. -\'0 "~ \.~ \<tC!..~Q MECHlÜ'1ICÞ.~ INTEGRITY - PART /2 . , ~ !\ \~~~ \~~: t~~~'\~c} Cement Volumes :', Þ..mt. Liner '~~ ; Csg j DV "'-Jp-" . C¡¡¡t -Jol to cover per~s . ~.... \:..'o\~ ."'::..J¥.-\<..."\t.."'\- \0 C(),-'{t~ ~ o~ 1....C)~"- \' \~~. ~(J() ~ ~ G (c "'i ~ <ö :).. b ~ \~ c.ç- -\.ö:.\ \ W~'I,- ~'-J~~~J Theore tical Toe (~'f'J'.Ct'" ~t;..cs. c'\,c..\...:J \c 1.. ~~ c .9-"'\ t--.. '::. "'- ,\0...., WJ \- ~ c'ì. t; \C\¿ CL~S1, Cement Bond Log (Yes or No) ''i'~~ ; In AOGCC File ~<t~ _. .~O~~ \c ~ \. ~ ~~\ M-~~'S.~\\jç:.. CBL !:..valu~t~Q..n7 zone ë.DOVe perfs. <=......,\\(.t..'""'" <:.>.."'" <è"'''', '"i\.-\- ,('.. '-J~\..... ß<:t..c,\- \;,)c",-'0 '~\':)'Io".'-3) u.~~'.t:k. o·*,.. ~Q..~~':. \\0.\':1 ~<:)~ <"~~o..~.:~ b'i ,-("(\V'Q~\- R ~ pm~">"-~ -\c.) <;~Q-<ë:~V {c~·'1~C)\C"\.~'\a ~ Proàue-tion Log: Type Evalu.ation ",v\~,\- -..)~~"" ~.\'\tJ"""~~\-.'c' <;:."-o~(,,;~~\.~- S~ ~ -\0 * . CONCLUSIONS: Q.<:..: ~~ ~ f-.....~\,{. ~9~ t;) Ie"" -0 ~ ? art n: ~s.<.,.'u.'\ ~'> '''~~ ,a.."'"..;) \,,'" \a lox ~'t""\O~<';\:c.:~~ ? ar:: : 2: \-1\:C <:.>. ""'-W C"\ b... \, ~ \'( , Ip.r~I? o¡.., "Z.()"~ '" t'tC'\ '\ \ ,\UZ ''-' f\ ~'-$(J(<-<L "ro~~ s} .\0\\0"0 \.)1{> '" -.)(j,\~c>' \\c..--. ~ C()KÑ.~cJ · J{2f'rV)5}ð-'is-05 OS/27/2003 13:51 FAX 907 564 '~f4 BP EXPLORATION 141 001 ) To: Tom Maunder Fax: (907) 276-7542 From: Matthew Green Subject: l\1PS-09 Operations Summary and Cement Bond Log Tom, Please find attached a copy of the NIPS-09 operations summary and SCMf log (26Apr03). If you require any additional infonnation, please do not hesitate to call. Cheers, IIfÁðVl R""'" ,. '.'" ....C·'..'· E,···",·",,,,, fJ'," b.'I¡;¡'''''''''' . L '.!Ii ~\,' L""" }! ,',,,,;-,,, ,J ,.~ 1,:,.. Matt MAY 2 J' j\J.a 011 & G~ Con1;. Ccmmission Aochr~ ) 141 003 OS/27 /20 0 3 13: 5 4 FAX 907 564 . Q)64 BP EXPLORATION Legal Well Name: MPS~09 Common Well Name: MPS~09 Event Name: DRILL +COMPLETE Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 27E ~~. ~j.~fÃï'f; 1;J I 'f.~;f":~h ":;~':!~~:'.'~~~~'~.~~~ ,!'.~, ~ Start: 20-2~2002 Rig Release: 28-2-2002 Rig Number: 27E Spud Date: 21-2~2002 End: 28-2-2002 19-2-2002 18:00 - 00:00 P PRE MOVE RIG FROM S-311- TO S-09i - MOVE PIPE SHEDS- MOTOR MODULE - PUMP MODULE - PIT MODULE - MOVE SUB MODULE OFF WELL MPS-311 20-2-2002 00:00 - 08:00 8.00 RIGU P PRE FINISH MOVING RIG FROM S-31i TO S-091- WELL TO WELL IN LINE MOVE - RELEASE TRUCKS AT 0800 HRS 08:00 - 15:00 7.00 RIGU P PRE HOOK UP ALL SERVICE LINES, BUILD BERMS AND SET CUTTING TANK, GET STEAM TO ALL UNITS ACCEPT RIG AT 1500 HRS 2/20/2002 15:00 - 20:00 5.00 BOPSUR P INT1 NIPPLE UP 20" DIVERTER SYSTEM WITH 16" LINE - INSTALL 4" WASH OUT VALVES ON CONDUCTOR PIPE 20:00 - 21 :30 1.50 BOPSUR P INT1 CUT AND SLIP 170' DRILL LINE 21 :30 - 22:00 0.50 BOPSUR P INT1 SERVICE TOP DRIVE 22:00 - 23:00 1.00 BOPSURP INT1 ACTIVATE ACCUMULATOR - FUNCTION DIVETER SYSTEM - VERIFY DIVERTER OPERATION 23:00 - 00:00 1.00 BOPSURP INT1 PICK UP 5" DRILL PIPE FROM PIPE SHED - DRIFT DRILL PIPE 21-2-2002 00:00 - 05:00 5.00 BOPSURP INT1 PU 5" DP FROM PIPE SHED ~ RABBIT EACH JOINT 05:00 - 06:00 1.00 BOPSUR? INT1 PREFORM FUNCTION TEST DIVERTER - ACCUMULATOR TEST WITH AOGCC WITNESS JEFF JONES. 06:00 - 08:00 2.00 BOPSURP INn CON'T PU 5" DP FROM PIPE SHED 08:00 - 08:30 0.50 BOPSURP INn PRE SPUD MEETING 08:30 - 09:00 0.50 BOPSURP INT1 TOP DRIVE SERVICE - RIG SERVICE 09:00 - 11 :30 2.50 DRILL P INn PU BHA - LOAD MWD 11 :30 - 12:00 0.50 DRI LL P INn SURFACE TEST ALL MUD EQUIPMENT 12:00 - 00:00 12.00 DRI LL P INT1 DIRECTIONAL DRILL FROM 112' TO 1099' - SPUD WELL IN AT 12:00 HRS - WOB 10K TO 25K - RPM 80 - TQ 3K - PP 1150 - GPM 375 - PU 85K - SO 85K - ROT 85K - ECD 9.54 22-2-2002 00:00 - 00:00 24.00 DRILL P INT1 DIRECTIONAL DRILLING - FROM 1099' TO 3637' - WOB 20K TO 30K - RPM 80 ~ TQ 8K TO 9K - GPM 400 - PP 1450 - ECD 10.1 - PU 120K - SO 105K - ROT 115K 23-2-2002 00:00 - 03:30 3.50 DRILL P INn DIRECTIONAL DRILL FROM 3637' TO 4076' - WOB 20K TO 25K - RPM 100 - TQ 9K TO 10K - GPM 400 - PP 1450 - PU 140K - SO 90 K - ROT 110K - ECO 10.17 03:30 - 05:00 1.50 DRILL P INn CIRCULATE 2 X BU - 6000 STKS - FOR BIT TRIP- SHAKERS CLEAN 05:00 - 07:30 2.50 DRILL P INT1 PUMP OUT OF HOLE FROM 3919' TO 817' - 100 STKS PER MIN -1300 PSI- NO PROBLEMS 07:30 - 08:00 0.50 DRILL P INT1 LD 12 JOINTS 5" HEVI-WEIGHT DP 08:00 - 11 :30 3.50 DRILL P INT1 CHANGE BIT'S - DOWN LOAD MWD - CHANGE MOTOR FROM 1.5 TO 1.22 - UP LOAD MWO - TIH W / BHA - TEST MWD 11:30-12:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 12:00 - 14:30 2.50 DRILL P INT1 RIH FROM 456' TO 4076' - TIGHT HOLE AT 1700' TO 2000' WORK THROUGH - REAM THROUGH BRIDGE 1850' TO 1870' - TIGHT TO 1990' - NO OTHER PROBLEMS ON TIH 14:30 - 00:00 9.50 DRILL P INT1 DIRECTIONAL DRILL FROM 4076' TO 5809' - WOB 30K TO 35K - RPM 120 - TQ 10K - GPM 500 - PP 2200 - PU 152K- SO 80K - ROT 115K - ECD 10.6 24-2-2002 00:00 - 10:00 10.00 DRILL P INT1 DIRECTIONAL DRILL FROM 5809' TO 6815' - WOB 30K TO 40K - RPM 120 - TQ 12K TO 14K - GPM 500 - PP 2450 - ECD 10.22 - PU 170K - SO 100K - ROT 120K 10:00 - 13:00 3.00 DRILL P lNT1 CIRCULATE 14000K STKS FOR WIPER TRIP - STAND F'~ ' ~L~:;~ -,,~ ~~: ~'~ l~: [', BACK ONE STAND EVERY 30 MINS - ROTATE 120 RPM , ~t:l g ,\ ~ ' ~ . ",:;r ;;":,!",:,r--~ I'è T":- ~1.""r'11i >.',JIftr Printed: 27-5-2003 2:24:16 PM M/~Y 2 '{ ¿Llu. ,~J.~~j~ C\1¡ ,~~ t~;:;$ Conf' , C~Hm;:ssion ..,1 :1";~ !~,~.~:~ OS/27/2003 13: 56 FAX 907 564 '<)f4 BP EXPLORATION ) I4J 004 '":'~';¡,~ìl¡lll'[i;~ ~·;!;~¡~~T~:tl0;:!~;IJ:~'i""i!\:~;~j4itff~,¡J~ti!i'î;3 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-09 MPS-09 DRILL +COMPLETE NABORS ALASKA DRILLING I NABORS 27E Start: 20-2-2002 Rig Release: 28-2-2002 Rig Number: 27E Spud Date: 21-2-2002 End: 28-2-2002 ';;r.~·~~'~~~~I'¡;í~~· ,:".:. ~~r~~:~I~..._.,,;¡r.J!.~~.', .:. ~. ,'!~:~..~ '~~~" .~,:/'!~'" .':, .'. '~~{.;..mt: ·~tT~: IUI~;.;·~~·~.:i>'~"':,:;¡,m:!~·,"!1":;_:¡::¡¡ ~'·.1"~,,·,,··:~~~.l,:'':;1;r.ll:1r..'; ,;~~::. ' :':~;;.,: .~::~~.~,; C . .!~~. '..'. ~t' i.;'¡:;- ..~.~ ."...: ,". . . ~;<~øa.w~~::i~~ mrQ"IÍl:·· t'Øi'·a·jlo.Ots' '..~<ff ai~ ¿'¥\ I~.ca(íll:)': ,':N~:": ~·;:laf,i'asé:,.~ .i.' t: ~ :.:<~ ·,<,,:e.:'t~:1> ': ;~~,' uÐscqptisrfof <2perattøns;{~r:' .,~;,I~".I , '·~'::-'I~,:,.~r~·,l,~~>:,·~;~·~:'{',:<. . -r~:II~;~ ~.Q: I :~,.r.';.~. .,~~·I' '. -·;~r:-··· ''i::E''" , /:':~_.~~.~, ,·,~~,~lf"i'.'"*~~::I~' ,.~~"'!:~1:fi "',:;:~,~.. ...:: ~~. I~-·· :';" \ ,.,.,~'.. _ -:~J". , ,.~~.,' I ,,~~;:: ':·rt.J:" 24-2-2002 10:00 - 13:00 13:00 - 18:30 INT1 INT1 3.00 DRILL P 5.50 DRILL P 18:30 - 19:30 1.00 DRILL P INT1 19:30 - 20:30 1.00 DRILL N RREP INT1 20:30 - 00:00 3.50 DRILL P INn 25-2-2002 00:00 - 00:30 0.50 DRILL P INT1 00:30 - 19:00 18.50 DRilL P INn 19:00 - 23:30 4.50 DRILL P INT1 23:30 - 00:00 0.50 DRILL P INT1 : 26-2-2002 00:00 - 03:30 3.50 DRILL P INT1 03:30 - 04:00 0.50 DRILL P INT1 04:00 - 04:30 0.50 DRILL P INT1 04:30 - 08:30 4.00 DRILL P INn 08:30 - 11 :30 3.00 DRILL P INT1 11:30 -15:30 4.00 DRILL P INT1 15:30 - 18:00 2.50 DRILL P INT1 18:00 - 18:30 0.50 DRILL P INT1 18:30 - 20:00 1.50 CASE P INT1 20:00 - 20:30 0.50 CASE P INT1 20:30 - 00:00 3.50 CASE P INn 27-2-2002 00:00 - 06:30 6.50 CASE P INT1 06:30 - 07:30 1.00 CASE P INn 07:30 - 08:00 0.50 CEMT P INT1 08:00 -10:30 2.50 CEMT P INT1 10:30 -14:00 3.50 CEMT P INT1 AND RECIPROCATE PIPE - 500 GPM PUMP OUT OF HOLE FROM 6468' TO 456' - WORKED THROUGH TIGHT SPOTS FROM 2500' TO 1750' PUMPING OUT - WORKING BACK UP AND DOWN WITHOUT PUMP ON THE 2ND WIPE ON EACH STAND LUBRICATE RIG - TOP DRIVE - DRAWWORKS CHANGE CLUTCH ENGAGE VALVE ON DRAWWORKS - CHANGE DIES IN TOP DRIVE GRIPPER RIH FROM 456' TO 6090' - BRIDGE @ 1777' -1817' -1950'- BACK REAM FROM 1850' TO 1777' - 1955' TO 1932' - CON'T RIH - NO OTHER PROBLEMS CON'T RIH FROM 6090' TO 6815' DIRECTIONAL DRilL FROM 6815' TO 8923' - WOB 30K - RPM 120 - TQ 14K - GPM 500· PP 2650 - ECD 10.26 - PU 198K - SO 90K - ROT 135K CBU 4 X FOR WIPER CONDITION TRIP FOR RUNNING 7" CASING - STAND BACK STAND EVERY 30 MINS WHILE CIRC - SHAKERS CLEAN WIPER TRIP - MONITOR WELL - POH FROM 8530' TO 8188' - TIGHT ATTEMPT TO WORK THROUGH - BACK REAM FROM 8190' TO 8140' - CON'T POH - PU WITH OUT PUMP 205 - SO 85 POOH - HOLE IN EXCELLENT SHAPE FROM 8100' NO PROBLEMS PULL TO 456' CLEAN RIG FLOOR RIG SERVICE - TOP DRIVE SERVICE RIH FROM 456' TO 8923' - TIGHT 7890' - WORK TROUGH - FILLING EVERY 25 STANDS CBU 4 X - 24000 STKS - CONDITION MUD TO RUN CASING -130 STKS - 550 GPM - RPM 120 - ROTATE I ~~ RECIPROCATE STRING WHILE CIRC \.J '" POH TO RUN CASING FROM 8923' TO 456' BHA. NO PROBLEMS PULLING OUT OF HOLE. LAY DOWN BHA - DOWN LOAD MWD CLEAR - CLEAN FLOOR RIG UP CASING EQUIPMENT - HOLD SAFETY MEETING PJSM (ON RUNNING CASING) PU SHOE JOINT - RUNNING 7" CASING - 55 JOINTS PICKED UP AT 00:00 HRS RUNNING 7" CASING - LAND CASING ON HANGER - SO 75K - RAN 215 JOINTS 26# BTC L-80 CIRCULATE AND CONDITION HOLE WITH FRANK'S FILL UP TOOL AT 80 SPM þ 338 GPM - 300 PSI. RIGGED DOWN FILL UP TOOL AND RIGGED UP CEMENTING HEAD WITH WASH UP LINE. CIRCULATE AND CONDITION HOLE FOR CEMENT JOB. 80 SPM - 338 GPM - 300 PSI. PUMP 5 BBLS WATER - TEST LINES TO 3500 PSI- PUMP 45 BBLS WATER -PUMPED 50 BBlS OF 10.2 PPG ALPHA SPACER WITH RED DYE - DROPPED BonOM PLUG WITH LAST 5 BBLS OF SPACER - MIXED AND PUMPED 1460 SXS ( 1080 BBlS) OF CLASS L CEMENT MIXED IN A 10.7 PPG SLURRY WITH A YIELD OF 4.15 CFT/SX. PUMPED LEAD Printed: 27-5-2003 2:24:16 PM OS/27/2003 13:59 FAX 907 564 )64 BP EXPLORATION ) 141 005 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-09 MPS-09 DRILL +COMPLETE NABORS ALASKA DRILLING I NABORS 27E ""..:J~ "'.I\I,¡~" a¡"'''' .;"~.{-:. Start: 20-2-2002 Rig Release: 28-2-2002 Rig Number: 27E Spud Date: 21-2-2002 End: 28-2-2002 1,~~":;~!~;~~1 :~~ J'ljW_:¡t~~"".I..~ " ::¡¡·;;~:2;i!;,~ 27-2-2002 10:30 - 14:00 3.50 CEMT P INTi 14:00 -15:30 1.50 CEMT P INTi 15:30 -16:00 16:00 - 17:00 17:00 - 00:00 0.50 CEMT P 1,00 CEMT P 7.00 CEMT N INTi INTi SFAL INTi 28-2-2002 00:00 - 02:00 2.00 CASE N SFAL INTi 02:00 - 03:30 03:30 - 08:00 INTi INTi 1.50 BOPSUR P 4.50 WHSUR P 08:00 - 11 :00 3.00 WHSUR P INTi 11 :00 - 20:00 9.00 DRILL P INn 20:00 - 21 :00 1.00 DRILL P INTi 21 :00 - 23:30 2.50 DRILL P INTi 23:30 - 00:00 0.50 DRILL P INTi CEMENT UNTil LEAD CEMENT WAS SEEN AT SURFACE. MIXED AND PUMPED 400 SXS (81 BBLS) PREMIUM CEMENT + 1 % CALCIUM CHLORIDE + .3% HALAD 344 + .2% CFR-3 MIXED IN AT 15.8 PPG SLURRY WITH A YIELD OF 1.15 CFT/SX. WASHED OUT LINES. DROPPED TOP PLUG. DISPLACE CEMENT WITH 220 BBLS OF 11.0 PPG BRINE AND 116 BBLS OF DIESEL. PUMPED PLUG WITH 2840 PSI (1000 PSI OVER CIRCULATING) AT 1520 HRS. HAD FULL RETURNS THROUGHOUT CEMENTING JOB. HAD 419 BBlS OF CEMENT TO SURFACE. FLUSHED DIVERTER WITH FRESH WATER. RIG DOWN CASING EQUIPMENT ATTEMPT TO BACK OUT LANDING JOINT - RIG UP RIG TONG FOR BACK UP ON HANGER IN CELLER - RIG UP POWER TONGS IN CELlER TO ATTEMPT TO BACK OUT LANDING JOINT - NO SUCCESS - ATTEMPT TO USE RIG TONG ON FLOOR AND POWER TONGS IN CELLER- CRUSHED LANDING JOINT ON RIG FLOOR WITH RIG TONGS RIG DOWN POWER TONGS ,IN CELLER - RIG UP RIG TONGS IN CElLER - BACK OUT LANDING JOINT - LAY DOWN LANDING JOINT - THREADS SEVERL Y GALLED ON BOTTOM THREADS OF RUNNING TOOL AND HANGER NIPPLE DOWN DIVERTER NIPPLE UP GEN 6 WELLHEAD - TEST VOID 1000 PSI. TEST FAILED. PULLED WELLHEAD AND CHANGED O-RING. INSTALLED GEN 6 WELLHEAD. TEST VOID TO 1000 PSI FOR 10 MINUTES. GOOD TEST. INSTALL TUBING HEAD AND 7" TOP VALVE. RIGGED UP TO TEST. HELD PJSM ON TESTING CASING AND WELLHEAD. RIGGED UP HB&R. TESTED WELLHEAD AND CASING TO 4500 PSI FOR 30 MINUTES AND RECORDED ON CHART. BLED OFF PRESSURE. AND INSTALLED BPV. PRESSURE TESTED BPV TO 1000 PSI FOR 30 MINUTES AND RECORDED ON CHART. HELD PJSM ON lAYING DOWN DRILL PIPE. LAID DOWN 5" DRILL PIPE FROM DERRICK IN MOUSEHOLE. UNLOAD 5" DP FROM PIPE SHED CUT DRLG LINE SERVICE TOP DRIVE AND RIG - RELEASE RIG AT 23:59 HRS ON 02-28-2002 Printed: 27-5-2003 2:24:16 PM OS/27 /2003 ~3: 52 FAX 907 56L1 '}64 - n~~ 1- ~~¡ ~: J {i-4' I I : t : I ..) ~ I ! ~ !~)¡ 1 ¡ J t ~ I · (.\ ¡ \ : oS 1 : , : I : Ij i ~¡ .-~} ~ J ~ I I ~ ~ ~\ ~ i~ l' 1 ~.I': '.J 1 ,,~ I \\ ~ J l · I I ~, ~ ·K~! ~ (.0 /1 ~ (" : ~ ~', ~ I tf~ I I, ~ I C I ~ I ,~, ~'-J I ,; ,. J "I \ .:' ~ ), ~ 1": \ ~: , -: ( 1 \ -: 1) -{ 'II : I . '" I ~ d 1 I. ! W~tEl \ j ....1:,~...~ " ./'Þ>; r.f.:11~ ~ ; air. I"'~ ~ C 11..1 fri1 ~ ,. ~ I ~ I ~~: I ~, :'t ,. ~\. } " íoP Ir.t ~ I I · I , · · · · · :-rJ ia4 \1\' ~ ,.¡ .!!. 1"' ~ '-.) \f) · I · · · f D · , ,~ · · · 8600. i ,. :Qt e-t"': ftt"- ¡ ~ ~ , "$f ~~ . : . : ., ~ . ~ : ' . , . þ " I ,. ~ 4 ~700 .~. , 1:' · ';:: · ~: · ~ · · · · ';: :.", · :.:-", · 'I !~ ~ L~ (çGmf r¿b~2,) BP EXPLORATION l1' (,. ~l~~ i' -...._-- ~ . C- '. > /~ ( ;' ~ , ~ \ ) ~ " c.. I ( / ,.' I ...., .....) " ,"'" "\ « « ~ ¿ ) ~ .., .... - .... ~.", ~ ~-.. -..; !I \~ -...:. ,"":" 4"".')~"'~~__ ~ ~":' , I r? < /? p I \ ' ., (' ~ ~ < ( '-! '" "'> 't ~/,.'" )'~ )'-.- . ...... - .i:'...... I ~~~- ( "'I I ,. ~r c' ~ < :-;i' ~~ · ....~('" r ...t'~ --r--:,-,· ",'7 , 1~¡~--~ f. :::" ;' ~ .... "'- .- -.. ,. <.. ~(1S\ S . ~ " ( « ) , J I ... 7 :; ') J \, ....... ~ ø~. ~.. - -.-..-::::.~- ... ~_;:__:r.- \' -- . ",,; - .Jw..... .- ., .~ .. " " ~~ I .... <..~-- .;' ì:> .,; .",.... .- ¿i:\.' - ;, - - -... - " ,... ,i..... " " -. ~ ~ )..J _'_ ..'~ ~ l.. ( ...... ...~ _ .-J- ....Q- ~:~ -..~- f..... _ '~ ,,~ c..., ('i''' ~ -' .. " '.'. ',;,' e!."":ft\"~" 0/ - Oq ~?,. . L' "~~ II\" I': .~ 'I: 'I , '. ''-:7 t;( t:JL.11 ~~~. ~ I,! tw L M :'~!;:}S~,(} c·¡ l.:on¡;. L,C:ï\rm3SJlJ: i~X~;~':~·,2.ft':~ 141 002 , ':...~ U\ ;i WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation COlTIm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 1. 00 Anchorage, Alaska 9950 1 July 30, 2002 RE:MWD Fonnation Evaluation Logs: l\1PS-09, AK-MW-22033 MPS-09: Digital Log Images: 50-029-23067 -00 1. CD Rom a~- O~O jJLjo;;z PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING mE ATTACHED COPIES OF mE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Artchorage, Alaska 99518 Date: BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-l 900 E. Benson Blvd. Anchorage, Alaska 99508 '~ j\~ ~'''''' +""~~ ii;"'....' If¡" ff", ,-~ ""-0< i'},r . ':~--,~' ì;- ~ \ r! ~ ~ "\~ ~ .. ~:om ~.11L..". ~ ,~~I ~ :t.....~~ DEC 1 3 2002 AJa:SKa J;~ 8. Gas Corm. Gc;mrrils..~¡on ¡' ¡,., ri.I1C¡ tOŒ:ge ) ) ;:( ()d) -ò èJ. Ò I09Y7 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 June 20, 2002 RE: MWD Formation Evaluation Logs MPS-09, AK-MW-22033 1 LIS fonnatted Disc with verification listing. API#: 50-029-23067-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage,AJaska99648 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Si~ {J.¥ REceIVED !! 'f I) ,,00.11) v J ;... i... L 'C. AfaskaOil & GasCoßS.Gomm~ Anchorase 'NUn ~ilmrn'I~~'[~~ GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie .-. Well MPS-9 ~~...oao MPS-31 ô1oa.-o J t.f MPE-13B ~Od-OYl.f ~. Job # Log Description 22219 CH EDIT SCMT (PDC) 22218 CH EDIT SCMT (PDC) 22217 CH EDIT SCMT (PDC) PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. RECEI- V· E··D Anchorage, Alaska 99519-6612 Date Delivered: JUN 0 4 2002 Alaska au & Gas Cons.Conurdaaion A.... ................. Date 04/26/02 04/26/02 04/24/02 5/22/2002 NO. 2095 Company Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Milne Point CD 1 1 1 Color 2 2 2 Sepia BL Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie ReceiVedbY:~~ ...<.: t-'ulllng v:::it-' on ~-paa ) ., J Subject: Re: Pulling VSP on S-pad ,Date: Tue, 19 Mar 2002 17:06:41 -0900 From: Tom Maunder <tom_maunder@admin.state.ak.us> To: "Campbell, Steve K" <CampbeIS@BP.com> CC: AOGCC North Slope Office <aogcc_prudhoe_bay@admin.state.ak.us> Steve, Thanks for the additional information regarding the VSP surveys. I had some questions from the inspectors regarding the work. You had described the work in the original permit to drill applications for the S pad wells. This message gives further details regarding the operation. It is interesting that there are individual BOP stacks on the wells. Regardless, the wells are still unperlorated and will remain so until 4ES completes the wells. You have approval to proceed with the operations as you describe. I will copy this message and place it in the respective well files. You do not need to provide a 403 for the operations. Please call if you have any questions. Tom Maunder, PE AOGCC "Campbell, Steve K" wrote: \ ~ dC)~-Od--D > Reference wells: MPS-15, 21, 31 & 9 > > Tom, > > In the original permits for the above mentioned wells, I did not include the > pulling of the VSP from the wells using the Klondike rig which will already > be over one of the wells waiting on the completion of the surveys. After > the surveys have been completed the plan is to have the Klondike rig pull > the VSP from each of the wells leaving the well as it was when the drilling > rig left it. Nabors 4es will be coming out to run the completions at a > later date. > , > Pr~c~dure for pulling the VSP's: > > 1. > 2. > 3. > 4. > 4. > 5. > 6. > > Can you give me a verbal to do this work and we could send you a 10403 to > follow it up for each well? > > Thanks for your consideration! > > Steve Campbell > BP Drilling Engineer > 907-564-4401 (0) > 907-564-4441 (f) > campbels@bp.com Run survey's Move Klondike rig on to well Pull VSP from the well Install BPV Close master valve and Nipple down thè BOP's Install tree cap and secure well Move Klondike rig off 10f2 3/20102 12:31 PM '1e: t-'ulllng V:::it-' on :::i-pac ; 20f2 ) Tom Maunder <tom maunder@admin.state.ak.us> Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission ,. ) 3/20/02 12:31 PM ) ~~]~E :'F !A~!A~~~!Æ ALASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. -pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. , PO Box 196612 Anchorage AK 99519-6612 Re: Milne Point Unit :MJ>S-09i BP Exploration (Alaska), Inc Permit No: 202-020 Sur. Loc. 1934' SNL, 49' WEL, Sec. 12, T12N, R10E, UM Btmhole Loc. 577' SNL, 4107' WEL, Sec. 08, T12N, RIlE, UM Dear Mr. Archey: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Annular disposal has not been requested as part of the Permit to Drill application for Milne Point Unit MPS-09i. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, ~1 OuLL ~ camm~chsli Ta;iofJ Chair BY ORDER OF THE COMMISSION DATED thisi&L day of February, 2002 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA \ )AND GAS CONSERVATION COMM. )ION PERMIT TO DRILL 20 AAC 25.005 1 a. Type of work III Drill 0 Redrill 1 b. Type of well ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1934' SNL,491 WEL, SEC. 12, T12N, R10E, UM At top of productive interval 6781 SNL, 4332' WEL, SEq. 08, T12N, R11 E, UM At total depth 577' SNL, 4107' WEL, SEC. 08, T12N, R11 E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL 375133,4107' MD No Close Approach 16. To be completed for devialed wells Kick Off Depth 200' Maximum Hole Angle 18. Casin~ Program Specifications Size Casinq Weiqht Grade Couplinq LenQth 20" 92# H-40 Welded 801 7" 26# L-80 BTC 88551 Hole 42" 9-7/8" Wjk.2/</(02- ',) 19, (L\ MVl \1 ,?-rdor o Exploratory 0 Stratigraphic Test 0 Development Oil III Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (OF or KB) 10. Field and Pool Planned KBE = 68.001 Milne Point Unit / Schrader 6. Property Designation Bluff '7æ:>{D?~ADL 380110 7. Unit or Property Name Milne Point Unit 8. Well Number M PS-09i 9. Approximate spud date 02118/02 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 88551 MD 14565' TVD o 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 75 Maximum surface 1514 psig, At total depth (TVD) 4401'/1947 psig Setting Depth Top Bottom MD TVD MD TVD Surface Surface 113' 113' Surface Surface 88551 4565' 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 Quantity of Cement (include staqe data) 260 sx Arctic Set (Approx.) 950 sx Class IL', 371 sx Class 'GI 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Structural Conductor Surface Intermediate Production Liner Length Size Perforation depth: measured true vertical Cemented MD TVD REceiVED JAN 2 3 ZOO? Alaska Oil & Gas Con~ Co " A I ,., mmlsSlon nCl10rage 20. Attachments III Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch III Drilling Program a Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer NameINumber: Steve Campbell, 564-4401 James Franks, 564-4468 Prepared By NameINumber: Sondra Stewman, 564-4750 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Pat Archey P 3 ~ck/ Title Senior Drilling Engineer Date 1/2 2../ () ö( Commission US8Ø1'1ly Permit ~~ž'-C 2D :ci-I ~U1Pf~ ".2-3D& 7- Öõ ~Xnll o;r ~~::::;~~~i~~ments Conditions of Approval: Samples Required 0 Yes .&'No Mud Log R'3qui~d 0 Yes l8(No Hydrogen Sulfide Measures 0 Yes [ljNo Directional Survey Required 'ia:Yes 0 No Require~ Working Pressu~e for BOPE P 2~ 0 3~ 0 4K ~ 5K 0 1 O~ 0 15K 0 3:5K p~i ~<y CTU . _ Otheft AIl~~ êwM+ gH.4L~~-' - J"q )\e'~í.-t..( ~ d . AoC7(( +0 fA...u. ~S.S- d;,1/4¥'Ý k~-k~Y'- {?> (, !NGI utlgmM \)IYlí~w DY 't"'-'t \ U by order of ~ J Approved By Cammy Oechsli 0 R I fQ~~sr. iORer.L the commission Date ~~ { [1 (j ~ Form 10-401 Rev. 12-01-85 lJ . \I /-\ Su mit I Triplicate ') Milne Pr ) MPS-09i Well Permit IWell Name: I MPS-9i Drill and Complete Plan Summary I Type of Well (service / producer / injector): I S-Shaped Water Injector Surface Location: 19341 FNL, (33451 FSL), 491 FEL, (5230' FWL), SEC. 12, T12N, R10E X=565,960.74 Y=6,000,013.87 Target Start Location: 6781 FNL, (46011 FSL), 43321 FEL, (9471 FWL), SEC. 8, T12N, R11 E "OA" X=571 ,722.15 Y=6,001 ,323.22 Target Start Location: 650' FNL, (46281 FSL), 42711 FEL, (10081 FWL), SEC. 08, T12N, R11 E "08" X=571 ,782.71 Y=6,001,351.27 Bottom Hole Location: 5771 FNL, (47021 FSL), 41071 FEL, (11711 FSL) SEC. 08, T12N, R11 E X=571 ,945.53 Y=6,001 ,426.68 I AFE Number: 1 TBD I RiQ: I Nabors 27E../' I I Estimated Start Date: 1 Feb. 18, 20021 I OperatinQ days to complete: 110 I I MD: 18855 1 I TVD: 14565 1 I Max Inc: 175 1 I KOP: 1200 I I KBE: 168 I I Well DesiQn (conventional, slimhole, etc.): I Conventional Grass Roots Injector I 1 Objective: I Schrader "OA" & "OB" I Mud Program: 9-7/8" Production Hole Mud Properties: Spud - LSND Freshwater Mud Density (ppg) Funnel visc VP HTHP pH API Filtrate LG Solids 8.6 - 9.20/" 75 - 150 25 - 60 N/A 9.0 - 9.5 < 8 < 6.5 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation . Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D8-4 disposal site./ Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR. Cement Program: Casin;iSize 17" 261b/ft L-80 BTC Surface casing Basis 250% excess over gauge hole in permafrost interval, 40% excess over gauge hole below pennafrost Total Cement Volume: Wash 50 bbl of Newtonian Wash weighted to 8.32 ppg Spacer 50 bþl of Viscosified Spacer (;Ypha Design) weighted to 10.50 ppg Lead 950 ;.-xs 10.7 lb/gal Class L - 4J~ cuft/sx (cement to surface) Tail 371 sxs 15.8 lb/gal Prem G - 1.15 cuft/sx (top of tail at 7750' MD) Temp I BHST ::::; 80° F from SOR, BHCT 85° F estimated by Halliburton 1 · ) Evaluation Program: Milne Pt' "' MPS-09i Well Permit 9 7/8" Hole Section: Open Hole: MWD/GR/RES Cased Hole: USIT (post rig) Formation Markers: Formation Tops MD kb (ft) TVDrkb Pore Pressure Estimated EMW r (ft) (Psi) (ppg) Base Permafrost 1933 1822 SVl Top Ugnu 6102 3559 1569 8.65 Top Ugnu M 8002 4066 1797 8.65 NA 8250 4177 1847 8.65 NB 8306 4207 1861 8.65 NC 8377 4248 1879 8.65 NE 8408 4267 1888 8.65 NF 8473 4308 1906 8.65 Top OA 8521 4340 1921 8.65 Base OA 8590 4386 1941 8.65 Top OB 8612 4401 1948 8.65 Base OB 8655 4430 1961 8.65 TD 8855 4565 2020 8.65 CasingITubing ProQram: Hole Size Csg/ WtlFt Grade Conn Length Top Bottom Tbg O.D. MD / TVDrkb MD / TVDrkb 42" 20" 92# H-40 Welded 80' 0' 113' / 113' ý' 9 7/8" 7" 26# L-80 BTC 8855' 0' 8855' / 4565' Recommended Bit ProQram: BHA Hole Depth (MD) Bit Type Nozzle/Flow Size rate 1 97/8" 0' - 6000' MXC-1 3-13 & 1-10 2 97/8 " 6000' - 8855' MXC-l 3-13 & 1-10 2 ) Milne Pf ) MPS-09i Well Permit Well Control: · Production hole will be drilled with a diverter. Surface Interval · Maximum anticipated BHP: · Maximum surface pressure: 1947 psi @ 4401' T~rkb - Top of "OB" 1514 psi @ surface (Based on BHP and a full column of gas from TD @ 0.1 psi/ft) function test diverter N/A/ 8.6 ppg KCL / 6.8 ppg Diesel · Planned BOP test pressure: · Kick tolerance: . Planned completion fluid: Drilling Hazards & Contingencies: Hydrates · Hydrates have been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafr~1 (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. · Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation If · Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. We do not expect losses while drilling this well. · H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. · H-05 (1995): Lost returns drilling at 5360 (3700 tvd), 40 bph to keep full, treated w/ LCM pills for two days, total losses 838 bbls, made hole opener run with some continued losses. · H-05 (1995): Ran 9-5/8" casing, lost 46 bbls conditioning mud. · H-07 (1995): Lost 50 bbls running 9-5/8" casing. · E-24 (1998): Made hole opener run, worked tight spots 1965, 2620, 3465, 5900 and 6000, lost 72 bbls while circulating. · H-08A (1997): Had some minor losses while running 4-1/2" liner. · Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. 3 ") Milne Pi ') MPS-09i Well Permit Expected Pressures · It is unlikely there will be unexpected overprj)'Ssure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.6Síb/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. This well we be drilled in the undrained portion of the MPH-07 fault block. Offset injectors that have above normal shut-in pressures will be shut-in prior to drilling this well. Some of the wells on H-pad have experienced sever gas cut mud well below the permafrost. Have gas detector installed prior to drilling on S-pad. Pad Data Sheet · Please Read the S-Pad Data Sheet thoroughly. Breathing · N/A Hydrocarbons ../ · Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Free Gas maybe encountered below the Upper Ugnu. Faults · 80 - 120' fault at or around the Ugnu to the west. The well plan was designed to stay away from the fault. · 20 - 60' fault at or around the Ugnu to the east. The well plan was designed to stay away from the fault. Hydrogen Sulfide · MPS Pad is not designated as an H2S Pad. Anti-collision Issues · MPS-9i has no anti-collision issues. Integrity Testing .pi'" ...".;" · MPS-09i will be drilled on diverter and no FIT/LOT is required. 4 ') Milne Pi ) MPS-09i Well Permit DRILL & COMPLETION PROCEDURE Drillinq 1. Prior to moving rig onto location, complete a pre-rig inspection with Pad operator. Ensure that the landing ring has been welded on the 20" conductor and check the height of the conductor for correct space out for the rig and diverter line. 2. MIRU drilling rig. Conduct spud meeting and HSE compliance briefing with all personnel on board rig. ,.// 3. Nipple up 21-1/4", 2000 psi diverter system with 16" outlet on existing 20" landing ring. Ensure diverter setup conforms to diagram posted with AOGCC, and that any flowlines that may be in the path of the diverter are protected. FUJ),ction test diverter, and record it on the IADC and morning report. Notify the AOGCC prior to conducting the function test on the diverter and provide them with a written copy of the test after it is completed. / 4. PU enough 5" drill pipe to drill to 8.855' MD. 5. PU 9-7/8" MXC-1, Sperry Motor, MWD/GR/Res. Drill 9-7/8" hole to KOP @ ±200' TVD/MD RKB. Start building angle at 1 °/100' up to 3°/100' with an azimuth of 140° to end of initial build @ 1.933' MD. 1.822' TVD and 37° as per mud and directional plan and hold. At 2.058' MD. 1.922' TVD begin build and turn at 2.2°/100' until 3. 753'MD. 2.943' TVD, 66.8° azimuth and 74.5° inclination and hold. At 7840' MD. 4.014'TVD start to drop and turn at 4°/100' until 8.521' MD. 4.340 TVD. 47.6° inclination and 65.6° azimuth until and hold until TD. . 400 - 500 gpm flow rate 6. Make a conditioning trip. Circulate and condition the mud as per mud program for cementing the 7" casing. Circulate until clean. 7. Rig up 7" casing running equipment. Ensure the cross over with safety valve is on the rig floor and has been function tested. 8. Run 7" 26#, L-80, BT&C surface casing to total depth. (See "detailed casing section" for centralizer placement) 9. Circulate and condition the mud as per mud program for cementing the 7" casing. Circulate 1- 1/2" open hole volume. 10. Mix and pump cement as per Halliburton Cement program and ADW recommended practices (RP) for surface Interval Cementing. Follow the recommended pump schedule to ensure not to exceeding anticipated formation fracture pressure. Continue reciprocating the pipe as long as practical. Bump the plug with 1,000 psi over circulating pressure. Check float equipment to make sure it's holding. Note that the cement will be displaced with KCL and Diesel for freeze protection. See casing and cement section for details. 11. Nipple down diverter system, pick up and install FMC 20" x 11" 5M Gen 6 wellhead system. Have FMC service hand on location to supervise installation and testing of wellhead. Test wellhead system as per FMC. 12. Nipple up 11" x 7-1/16" 5M FMC hold down flange, FMC 7-1/6" 5M gate valve and Tree cap (with gauge). Rig up HBR. Test wellhead and 7" casing to 4500 psi ~E 30 min on a chart. 13. Install BPV & Secure well. 14. Rig down and release the rig. Complete a post rig inspection with the Pad operator prior to the rig moving off of the well. Fill out well handover form. 5 ) Milne P~ ') MPS-09i Well Permit POST RIG 1. 2. 3. 4. Rig up coil and perform clear¡øut run Rig up wireline and run US IT Move in Klondike #1 work platform ./ NU 7-1/16" 5M BOP stack and test blind/shear rams 250 psi low; 4,000 psi high and test the annular to 250 psi low and 1,000 psi high. Pull BPV II" Rig up and run 1-1/2", 2.4ppf, N-80, 10 rd EUE, with Seismic cable and Geophones strapped to the outside of the tubing to TD. Land tubing in split bowl on top of the annular. Install valve in top of 1-1/2" tubing and test same with nitrogen to 90 psi RD Klondike and support equipment and move off 5. 6. 7. 8. 9. NOTE: Comø/etion for final injection will be done at a later date and øermitted as reQuired. 6 BP EXPLORA TION Milne Point Unit ~/askaDrilling & Wells . ad Qev Working, Slot MP5-09 5-09 - M5-09 Wp04 Pilot Revised: 18 January, 2002 PROPOSAL REPORT 18 January, 2002 Surface Coordinates: 6000013.87 N, 565960.74 E (70024'37.7149" N, 149027'46.4250" W) Surface Coordinates relative to Project H Reference: 1000013.87 N, 65960.74 E (Grid) Surface Coordinates relative to Structure: 42.26 N, 383.90 W (True) Kelly Bushing: 72.00ft above Mean Sea Level "'~F"'Y-sL...r1 R8n;..IBIJi·.·....··.."YI:t:;íL" A kliìiburtm Öiliiif'l'*'i}' .-.-' ~ Proposal Ref: pro 10043 DrillQuest 2.00.09.008 Page2of8 18 January, 2002 - 17:31 Sperry-Sun Drilling Services Proposal Report for MPS-D9 - MS-D9 Wp04 Pilot Revised: 18 January, 2002 BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells Milne Point Unit MPS-Pad Dev Working Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings m Rœum Section Comment '¡¡¡it;" aIr:" (ft) (ft) (ft) (ft) (ft) (ft) (ft) 'il¡lî/100ft) 0.00 0.000 0.000 -72.00 0.00 0.00 N 0.00 E 6000013.äviN. 56599Q~Zft. E 0.00 200.00 0.000 0.000 128.00 200.00 O.OON 0.00 E 6000013.87 N 565900:74 E 0.000 0.00 KOP : Start Dir @ 1.5000/100ft : 200 .OOOMD ,200.0OOTVD 300.00 1.500 140.000 227.99 299.99 1.00 S 0.84 E 6000012.87 N 565961.59 E 1.500 0.60 400.00 3.000 140.000 327.91 399.91 4.01 S 6000009.89 N 565964.14 E 1.500 2.40 --' 500.00 4.500 140.000 427.69 499.69 9.02 S 'f' ijF60()(}ØØ4.92 N 565968.39 E 1.500 5.39 Build Rate - 2.268°/1 o Oft 600.00 6.768 140.000 527.20 599.20 16.54 S 5999997.45 N 565974.76 E 2.268 9.88 700.00 9.035 140.000 626.25 698.25 27.07 S 5999987.00 N 565983.69 E 2.268 16.17 800.00 11 .303 140.000 724.67 796.67 ~t!;~'!; 5999973.58 N 565995.16 E 2.268 24.25 900.00 13.571 140.000 822.32 894.32 57:Ø~¡$¡; 5999957.20 N 566009.15 E 2.268 34.10 1000.00 15.839 140.000 919.03 991 .03 76.54$¡i¡r 5999937.91 N 566025.63 E 2.268 45.71 1100.00 1 8.1 06 140.000 98.90 S 82.98 E 5999915.71 N 566044.59 E 2.268 59.07 1200.00 20.374 140.000 124.14 S 104.16 E 5999890.66 N 566066.00 E 2.268 74.15 1300.00 22.642 140.000 152.22 S 127.73 E 5999862.78 N 566089.81 E 2.268 90.92 1400.00 24.909 140.000 183.10 S 153.64 E 5999832.13 N 566115.99 E 2.268 1 09.37 1500.00 27.177 140.000 216.73 S 181.86 E 5999798.75 N 566144.51 E 2.268 129.46 1600.00 29.445 140.000 1543.49 253.06 S 212.34 E 5999762.69 N 566175.31 E 2.268 151.15 1700.00 31.712 14Q;()()0 1557.58 1629.58 292.03 S 245.04 E 5999724.02 N 566208.35 E 2.268 174.43 1800.00 33,980 '140.000 1641.59 1713.59 333.57 S 279.90 E 5999682.78 N 566243.58 E 2.268 199.25 1900.00 3ß.2~ " 140.000 1723.38 1795.38 377.64 S 316.87 E 5999639.05 N 566280.94 E 2.268 225.56 1933.17 37.000 140.000 1750.00 1822.00 392.79 S 329.59 E 5999624.00 N 566293.79 E 2.268 234.62 End Dir, Start Sail @ 37.000° : 1 933.17ftM D, 1822.0OOTVD Base Permafrost .- " 2000.00 37.000 140.000 1803.38 1875.38 423.60 S 355.45 E 5999593.42 N 566319.91 E 0.000 253.02 2058.38 37.000 140.000 1850.00 1922.00 450.52 S 378.03 E 5999566.71 N 566342.73 E 0.000 269.10 Begin Dir @ 4.0000/100ft : 2058.38ft MD, 1922.000 TVD 2100.00 37.150 137.249 1 883.21 1955.21 469.34 S 394.61 E 5999548.03 N 566359.48 E 4.000 281.11 2200.00 37.766 130.748 1962.62 2034.62 511.52 S 438.32 E 5999506.24 N 566403.56 E 4.000 314.42 2300.00 38.727 124.474 2041 .1 9 2113.19 549.23 S 487.33 E 5999468.97 N 566452.90 E 4.000 353.88 DrillQuest 2.00.09.008 Page 30t8 18 January, 2002 - 17:31 Sperry-Sun Drilling Services Proposal Report tor MPS-09 - MS-D9 Wp04 Pilot Revised: 18 January, 2002 BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells Milne Point Unit MPS-Pad Dev Working Measured Sub-Sea Vertical Local Coordinates Global Coordin~l@§fì¡¡;;;, Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings ,¡;âlštiñtiš¡l¡, RateMw' Section Comment (ft) (ft) (ft) (ft) (ft) (ft) .._.-:-,,-:-:-,~~ ;:0 .. "->::;:,,:-" ~::--, ::: .-~., "h 2400.00 40.009 118.498 2118.52 2190.52 582.28 S 541.39 E 5999436.391&, 56651liliiË' 4.000 399.29 2500.00 41 .580 112.866 2194.25 2266.25 610.53 S 600.24 E 5999408.67 N 566566:35 E 4.000 450.44 2600.00 43.41 0 1 07.598 2268.00 2340.00 633.82 S 663.59 E 5999385.94 N 566629.91 E 4.000 507.08 2700.00 45.464 102.694 2339.42 2411.42 652.05 S 731.14E 5999368.31 N 566697.61 E 4.000 568.93 2800.00 47.714 98.139 2408.16 2480.16 665.12 S ߨ2~5~1 E 5999355.86 N 566769.14 E 4.000 635.69 .--- 2900.00 50.131 93.910 2473.88 2545.88 672.98 S 5999348.67 N 566844.14 E 4.000 707.03 3000.00 52.691 89.976 2536.26 2608.26 675.58 S 5999346.76 N 566922.25 E 4.000 782.62 3100.00 55.372 86.308 2595.01 2667.01 ô72.91 S 5999350.14 N 567003.08 E 4.000 862.06 3200.00 58.157 82.874 2649.82 2721 .82 5999358.79 N 567086.25 E 4.000 944.99 3300.00 61.028 79.644 2700.44 2772.44 5999372.69 N 567171.34 E 4.000 1031.00 3400.00 63.972 76.590 2746.62 2818.62 633.56 1291.66 E 5999391.74 N 567257.94 E 4.000 1119.67 3500.00 66.977 73.688 2788.13 2860.13 610.21 S 1379.56 E 5999415.87 N 567345.64 E 4.000 1210.56 3600.00 70.033 70.913 2824.77 2896.77 581.90 S 1468.18 E 5999444.96 N 567434.00 E 4.000 1303.24 3700.00 73.130 68.245 -¿S$137 2928.37 548.79 S 1557.06 E 5999478.85 N 567522.59 E 4.000 1397.25 3753.45 74.799 66.855 T2871.14, 2943114 529.17 S 1604.53 E 5999498.89 N 567569.88 E 4.000 1447.88 End Dir, Start Sail @ 74.799° : 3753.45ftMD,2943.14ftTVD 3800.00 74.799 66.855 2955.34 511.51 S 1645.84 E 5999516.91 N 567611.03 E 0.000 1492.07 3900.00 74.799; ., 66~855 2909.56 2981.56 473.58 S 1734.58 E 5999555.62 N 567699.43 E 0.000 1586.99 4000.00 74.799 66.855 2935.78 3007.78 435.65 S 1823.31 E 5999594.34 N 567787.83 E 0.000 1681.92 4100.00 74.799 '·66.855 2962.00 3034.00 397.72 S 1912.04 E 5999633.05 N 567876.22 E 0.000 1776.84 4200.00 74.799 66.855 2988.22 3060.22 359.79 S 2000.78 E 5999671.76 N 567964.62 E 0.000 1871 .76 4300.00 74.799 66.855 3014.44 3086.44 321 .86 S 2089.51 E 5999710.48 N 568053.01 E 0.000 1966.69 --- 4400.00 74.799 66.855 3040.66 3112.66 283.93 S 2178.25 E 5999749.19 N 568141.41 E 0.000 2061.61 4500.00 74.799 66.855 3066.88 3138.88 246.00 S 2266.98 E 5999787.90 N 568229.81 E 0.000 2156.53 4600.00 74.799 66.855 3093.10 3165.10 208.07 S 2355.72 E 5999826.61 N 568318.20 E 0.000 2251.46 4700.00 74.799 66.855 3119.32 3191.32 170.14 S 2444.45 E 5999865.33 N 568406.60 E 0.000 2346.38 4800.00 74.799 66.855 3145.54 3217.54 132.21 S 2533.19 E 5999904.04 N 568495.00 E 0.000 2441.31 4900.00 74.799 66.855 3171.76 3243.76 94.28 S 2621.92 E 5999942.75 N 568583.39 E 0.000 2536.23 5000.00 74.799 66.855 3197.98 3269.98 56.35 S 2710.66 E 5999981.46 N 568671.79 E 0.000 2631.15 5100.00 74.799 66.855 3224.20 3296.20 18.42 S 2799.39 E 6000020.18 N 568760.18 E 0.000 2726.08 5200.00 74.799 66.855 3250.42 3322.42 19.51 N 2888.12 E 6000058.89 N 568848.58 E 0.000 2821 .00 DrillQuest 2.00.09.008 Page 4 ot8 18 January, 2002 - 17:31 Sperry-Sun Drilling Services Proposal Report for MPS-OS - MS-DS Wp04 Pilot Revised: 18 January, 2002 BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells Milne Point Unit M PS-Pad Dev Working Measured Sub-Sea Vertical Local Coordinates Global Coordinatesiiw", Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings "1'1¡~:~g';i!r, Section Comment (ft) (ft) (ft) (ft) (ft) (ft) ~- ..-r.-.-~ .--;.;;-- .,-:->:-):.,-,-) ..:-:-:-:-:-:-.-.---~ -.-.-h-.-.-.-' .,;;,.... ""-_....... 5300.00 74.799 66.855 3276.64 3348.64 57.44 N 2976.86 E 6000097.60iN 5689B,fíj;E' 0.000 2915.92 5400.00 74.799 66.855 3302.86 3374.86 95.37 N 3065.59 E 6000136.31 N 569025:37 E 0.000 3010.85 5500.00 74.799 66.855 3329.08 3401 .08 133.30 N 3154.33 E 6000175.03 N 569113.77 E 0.000 3105.77 5600.00 74.799 66.855 3355.30 3427.30 171.23 N 3243.06 E 6000213.74 N 569202.16 E 0.000 3200.69 5700.00 74.799 66.855 3381.52 3453.52 209.16 N 3331.80 E 6000252.45 N 569290.56 E 0.000 3295.62 ~' 5800.00 74.799 66.855 3407.74 3479.74 247.09 N 3420.53 E 6000291.16 N 569378.96 E 0.000 3390.54 5900.00 74.799 66.855 3433.96 3505.96 285.03 N 3509.27 E 6000329.88 N 569467.35 E 0.000 3485.47 6000.00 74.799 66.855 3460.18 3532.18 322.96 N 3598.00 E 6000368.59 N 569555.75 E 0.000 3580.39 6100.00 74.799 66.855 3486.40 3558.40 36q;§~, ~""'. ",,,.3686.73 E 6000407.30 N 569644.14 E 0.000 3675.31 6102.30 74.799 66.855 3487.00 3559.00 361 :7~¡~~!¡ '\à¡W'3688.78 E 6000408.19 N 569646.18 E 0.000 3677.50 Top Ugnu 6200.00 74.799 66.855 3512.62 3584.62 398.82 N 3775.47 E 6000446.01 N 569732.54 E 0.000 3770.24 6300.00 74.799 66.855 3538.84 3610.84 436.75 N 3864.20 E 6000484.73 N 569820.94 E 0.000 3865.16 6400.00 74.799 66.855 3637.06 474.68 N 3952.94 E 6000523.44 N 569909.33 E 0.000 3960.08 6500.00 74.799 66.855 3663.27 512.61 N 4041.67 E 6000562.15 N 569997.73 E 0.000 4055.01 6600.00 74.799 66.855 3689;49 550.54 N 4130.41 E 6000600.86 N 570086.12 E 0.000 4149.93 6700.00 74.799 66.855 3715.71 588.47 N 4219.14 E 6000639.58 N 570174.52 E 0.000 4244.86 6800.00 74.799' 66:855' 3741.93 626.40 N 4307.88 E 6000678.29 N 570262.92 E 0.000 4339.78 6900.00 74.799< · 66.855 3696.15 3768.15 664.33 N 4396.61 E 6000717.00 N 570351.31 E 0.000 4434.70 7000.00 74..799 66.855 3722.37 3794.37 702.26 N 4485.34 E 6000755.71 N 570439.71 E 0.000 4529.63 7100.00 7.4.799 '66.855 3748.59 3820.59 740.19 N 4574.08 E 6000794.43 N 570528.10 E 0.000 4624.55 7200.00 74.799 66.855 3774.81 3846.81 778.12 N 4662.81 E 6000833.14 N 570616.50 E 0.000 4719.47 7300.00 74.799 66.855 3801.03 3873.03 816.05 N 4751.55 E 6000871.85 N 570704.90 E 0.000 4814.40 .~ 7400.00 74.799 66.855 3827.25 3899.25 853.98 N 4840.28 E 6000910.56 N 570793.29 E 0.000 4909.32 7500.00 74.799 66.855 3853.47 3925.47 891.91 N 4929.02 E 6000949.28 N 570881.69 E 0.000 5004.25 7600.00 74.799 66.855 3879.69 3951.69 929.84 N 5017.75 E 6000987.99 N 570970.08 E 0.000 5099.17 7700.00 74.799 66.855 3905.91 3977 .91 967.77 N 5106.49 E 6001026.70 N 571058.48 E 0.000 5194.09 7800.00 74.799 66.855 3932.13 4004.13 1005.70 N 5195.22 E 6001 065.42 N 571146.88 E 0.000 5289.02 7840.62 74.799 66.855 3942.78 4014.78 1021.11 N 5231.26 E 6001081.14 N 571182.78 E 0.000 5327.57 Begin Dir @ 4.0000/100ft : 7840.62ft MD, 4014.78ft TVD 7900.00 72.426 66.771 3959.53 4031.53 1043.54 N 5283.63 E 6001104.03 N 571234.95 E 4.000 5383.60 8000.00 68.428 66.624 3993.03 4065.03 1080.80 N 5370.15 E 6001142.06 N 571321.13 E 4.000 5476.21 DrillQuest 2.00.09.008 Page 50f8 18 January, 2002 - 17:31 Sperry-Sun Drilling Services Proposal Report for MPS-OS - MS-DS Wp04 Pilot Revised: 18 January, 2002 BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells Milne Point Unit MPS-Pad Dev Working Measured Sub-Sea Vertical Local Coordinates Global CoordinatM;¡î!ü, Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings ,~ø;_šfingl¡¡¡';;i;;; Rate;;j; Section Comment (ft) (ft) (ft) (ft) (ft) (ft) Y{lr&{ft)<':tl;,;¡~llf/1 000) -~.-.---..-h ~_..__._.. .__on mn ....._.... ",-:-:-:-::;-:-:-:-: -:-,-:-:,-"- . ......... m_..._ .._m ".:-,-:-,-:-:-:-:;-, _.x:.:-:-:-:-:-:-:- 8002.64 68.323 66.620 3994.00 4066.00 1081.77 N 5372.40 E 6001 5713iitlø¡e 4.000 5478.62 Top Ugnu M 8100.00 64.431 66.468 4033.01 4105.01 1117.27 N 5454.21 E 6001179.27 N 571404:87 E 4.000 5566.26 8200.00 60.433 66.302 4079.28 4151.28 1152.77 N 5535.42 E 6001215.49 N 571485.76 E 4.000 5653.31 8250.56 58.412 66.213 4105.00 4177.00 1170.30N 5575.27 E 6001233.36 N 571525.46 E 4.000 5696.05 Schrader NA 8300.00 56.436 66.122 4131.62 4203.62 1187.13 N 5613.37 E 6001250.53 N 571563.41 E 4.000 5736.93 ~ 8306.10 56.192 66.111 4135.00 4207.00 1189.19 N 5618.02 E 6001252.63 N 571568.03 E 4.000 5741.91 Schrader NB 8377.19 53.351 65.972 4176.00 4248.00 1212.76¡N 5671.07 E 6001276.67 N 571620.88 E 4.000 5798.87 Schrader NC 8400.00 52.439 65.925 4189.76 4261.76 ~~.~,r.;¡ 5687.69 E 6001284.23 N 571637.43 E 4.000 5816.71 8408.56 52.097 65.907 4195.00 4267.00 ·.."""',4<,,5693.87 E 6001287.05 N 571643.59 E 4.000 5823.35 Sch rader N E 8473.44 49.505 65.766 4236.00 4308.00 124:f5~!~!f:;;; ·~'5739.74 E 6001308.03 N 571689.27 E 4.000 5872.63 Schrader NF 8500.00 48.443 65.705 4253.44 4325.44 1251.75 N 5758.01 E 6001316.43 N 571707.47 E 4.000 5892.27 8521.77 47.573 65.654 4268.00 4340.00 1258.42 N 5772.75 E 6001323.22 N 571722.15 E 4.000 5908.12 End Dir, Start Sail @ 47.573° : 8521.77ftMD,4340.0OftTVD TSBD-OA Target - MPS-09 T1 Top OA 8589.95 47.573 65~6?:t ····4314:00 4386.00 1279.17N 5818.60 E 6001344.37 N 571767.82 E 0.000 5957.42 TSBC (base OA) 8600.00 47.573 65:654, ~.?O~¡;ª{ 4392.78 1282.22 N 5825.36 E 6001347.49 N 571774.55 E 0.000 5964.69 8612.19 47.573 651654 4329:00 4401.00 1285.93 N 5833.55 E 6001351.27 N 571782.71 E 0.000 5973.50 Hold Angle = 47.573 TSBB-OB Target - MPS-09 T2 Top OB 8655.17 47:573 65.654 4358.00 4430.00 1299.01 N 5862.46 E 6001364.61 N 571811.50 E 0.000 6004.59 SBA5 (base OB) 8700.00 47.573 65.654 4388.24 4460.24 1312.65 N 5892.61 E 6001378.51 N 571841.53 E 0.000 6037.00 8800.00 47.573 65.654 4455.71 4527.71 1343.08 N 5959.86 E 6001409.54 N 571908.50 E 0.000 6109.31 -- " 8855.27 47.573 65.654 4493.00 4565.00 1359.90 N 5997.03 E 6001426.68 N 571945.53 E 0.000 6149.28 Target - MPS-09 TD 8900.00 47.573 65.654 4523.17 4595.17 1373.51 N 6027.11 E 6001440.56 N 571975.48 E 0.000 6181.63 8962.00 47.573 65.654 4565.00 4637.00 1392.38 N 6068.80 E 6001459.79N 572017.01E 0.000 6226.46 Total Depth: 8962.00ftM D ,4637 .0OftTVD 7" Casing DrillQuest 2.00.09.008 ,-,0 ~. Alaska Drilling & Wells MPS-Pad Dev Working Page 60f8 Begin Dir @ 4.0000/100ft : 7840.62ft MD, 4014.78ft TVD End Dir, Start Sail @ 47.573° : 8521.77ftMD,4340.00ftTVD Hold Angle = 47.573 Total Depth: 8962.0OOMD,4637.0OOTVD KOP : Start Dir @ 1.500°/1000: 200.0OOMD,200.00ftTVD Build Rate - 2.268°/1000 End Dir, Start Sail @ 37.000°: 1933.17ftMD,1822.00ftTVD Begin Dir @ 4.0000/100ft: 2058.38ft MD, 1922.000 TVD End Dir, Start Sail @ 74.799° : 3753.45ftMD,2943.14ftTVD 5231.26 E 5772.75 E 5833.56 E 6068.80 E 1258.42 N 1285.93 N 1392.38 N ',4014.18 A340.00 '44ö1.00· 4637:00 200.00 499.69 1822.00 1922.00 2943.14' Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 18 January, 2002 -17:31 7840.62 8521.77' 8612.19 8962.00 200.00 500.00 1933.17 2058.38 3753.45 Measured Depth (ft) Comments Based upon Minimum Curvature type calculations, at a Measured Depth of 8962.00ft., The Bottom Hole Displacement is 6226.48ft., in the Direction of 77.078° (True). 0.00 E 7.57E 329.59 E "'378.03 E 1604.54 E 0.00 N 9.02 S 392;:79 S 450.52 S The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 77.230° (True). All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Sperry-Sun Drilling Services Proposal Report for MPS-09 - MS-D9 Wp04 Pilot Revised: 18 January, 2002 BP EXPLORATION (ALASKA) INC. Milne Point Unit DrillQuest 2.00.09.008 ---' .--- Alaska Drilling & Wells MPS-Pad Dev Working Page 70f8 18 January, 2002 - 17:31 1750.00 0.000 0.000 1933.17 1822.00 1750.00 392.79 S ,/6?~Ë2~.i§¡¡ Base Permafrost 3487.00 0.000 0.000 6102.30 3559.00 3487.00 361.76 N d¡"rlaS8S¡ragiE· Top Ugnu 3994.00 0.000 0.000 8002.64 4066.00 3994.00 1081.77 N 5372.40 E Top Ugnu M 4105.00 0.000 0.000 8250.56 4177.00 4105.00 1170.30 N 5575.27 E Schrader NA 4135.00 0.000 0.000 8306.10 4207.00 4135.00 1189.19N 5618.02 E Schrader NB 4176.00 0.000 0.000 8377.19 4248.00 4176.00 5671.07 E Schrader NC 4195.00 0.000 0.000 8408.56 4267.00 4195.00 5693.87 E Schrader NE 4236.00 0.000 0.000 8473.44 4308.00 42~.00 5739.74 E Schrader NF 4268.00 0.000 0.000 8521.77 4340.00 42~~.00 5772.75 E TSBD-OA 4314.00 0.000 0.000 4386.00 43;f~.00 5818.60 E TSBC (base OA) 4329.00 0.000 4401.00 4329.00 1285.93 N 5833.55 E TSBB-OB 4358.00 0.000 4430.00 4358.00 1299.01 N 5862.46 E SBA5 (base OB) Casing details F' rorn To Measured. Vertical Measured Vertical Depth Depth Depth Depth Casing Detail (ft) (ft) (ft) (ft) <Surface> <Surface> 8962.00 4637.00 7" Casing Penetration Point Sub-5ea Depth Northings (ft) (ft) Profile Measured Vertical Depth Depth (ft) (ft) Formati on Plane (Below Well Origin) Sub-Sea Dip Dip Dir. (ft) Deg. Deg. Formation Tops BP EXPLORATION (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Proposal Report for MPS-09 - MS-09 Wp04 Pilot Revised: 18 January, 2002 DrillQuest 2.00.09.008 Page 80(8 18 January, 2002 - 17:31 T a £;9;e t TVD fir!'!:!¡!!;';, No.!.?~ Eastings Target Target (ft) (ft'" (ft) Shape Type 4340.00 1258.42 N 5772.75 E Polygon Mean Sea Level/Global Cooidfnates: 4268.00 6001323.22 N 571722.15 E '~ Geographical Coordinates: 700 24' 50.0704" N 149024' 57.1769" W oint #1 4340.00 1116.56 N 5749.97 E #2 4340.00 1112.15N 6249.95 E #3 4340.00 1612.13 N 6254.36 E #4 4340.00 1616.54N 5754.38 E Mean Sea Level/Global Coordinates #1 4268.00 6001181.17N 571700.62 E #2 4268.00 6001181.17 N 572200.62 E #3 4268.00 6001681.17 N 572200.62 E #4 4268.00 6001681.17 N 571700.62 E Geographical Coordinates #1 700 24' 48.6754" N 1490 24' 57.8480" W #2 700 24' 48.6280" N 149024'43.1898" W #3 700 24' 53.5456" N 1490 24' 43.0480" W #4 700 24' 53.5930" N 1490 24' 57.7073" W 4340.00 1258.42 N 5772.75 E Point Mean Sea Level/Global Coordinates: 4268.00 6001323.22 N 571722.15 E Geographical Coordinates: 700 24' 50.0704" N 149024' 57.1769" W '-' 4401.00 1285.93 N 5833.55 E Point Mean Sea Level/Global Coordinates: 4329.00 6001351.27 N 571782.71 E Geographical Coordinates: 700 24' 50.3406" N 1490 24' 55.3935" W 4565.00 1359.90 N 5997.03 E Point Mean Sea Level/Global Coordinates: 4493.00 6001426.68N 571945.53E Geographical Coordinates: 700 24' 51.0669" N 1490 24' 50.5989" W MPS-09 TO MPS-09 T2 Top OB MPS-09 MPS-09 Geo-Poly Target Name Alaska Drilling & Wells MPS-Pad Dev Working Targets associated with this well path BP EXPLORATION (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling Services Proposal Report for MPS-OS - MS-DS Wp04 Pilot Revised: 18 January, 2002 Sper. ì-Sun Drilling 56. 'Vices Proposal Data - MPS-06 Slot 09 - MS-09 Wp04 Pilot MD Delta Inclin. Azimuth TVD Northings Eastings Dogleg A. Build Toolface VS (770) (ft) MD (ft) (D) (D) (ft) (ft) (ft) (0/100ft). (0/100ft) (0) (ft) -"""1'-::. .::..::::: '::'Ò~'6~I~~::::-':===:~ ········á~()~~ .~=:_._~~~ª~."... .. __ ...~~~~·=~·:·=·~:··:ª~·~~L~:·~:·.···:··:·~-;~§~:~-~~~:~.~===[:====~-==:~:::===:==:~~:::=:=~~~: L ._?__.. ..?o.o.~~ ._....._?~~.Q~... 0:090... ....... .....~.:.~9.. _.__?P~:.'?Q___.___......~~~_._._....._~.o~._~_~:~~_..._~.000 .._~.o~__.. o.o~ ~,____!_._ .~~~·.~~___.....~~~.:.9~... ... 4...5g~........~ ~o.ooo ".......__~.~~~.~_~_._~~?_~~.,?~~~_.~_____.__~ .5~.~_._.J~~~.___~~~~00 ~_.__?39 .---.~-. ;~~~};-·-···~··~·~·:i~--j~ ~:---+:~:~6R:~i:~-..--¡~5:~~-~T,,--i~~6H···~::::::~~~ªª~;··-·-~:6*-~~~5H~::~d 6 3753.45 1695.07 74.799 66.855 2943.14 529.17 S 1604.53 E 4.000 2230 274.067 1447.88 7 7840.62 4087.17 74.799 66.855 4014.78 1021.11 N . 5231.26 E 0.000 0.000 0.000 5327.57 8T 8521.77 681.15 47.573 65.654 4340.00 1258.42 N 5772.75 E 4.000 -3.997 181.938 5908.12 9T 8612.19 90.42 47.5731 65.654..~~9_~P~1._~~~~:.~3_N~..._5.8~~:5~ ,E 0.0001 0.000 0.000 5973.50 ~.. ~_ºT.._......~.~§?:g~.... ..... ~~.~:.~~ ...._...~T.~!.~.:.......... .~~:.§~_~. u~§~?:~e>.:", ~_~~2.~8}~ ._. ~_0.68.~o..5. . .......... ..9:.9.~.;..............._9.:9P.9... .__..p..:~~. ..._"""_.__§?.g~:~. 18 January, 2002 - 15:32 - 1 - DrillQuest -r-- l.~Y-!!!ILIl BPXA l.nULLIH-aJ, AJLhVIL)d Milne Point Unit II. i¡ """'" ~lrt 1600 - 800 - Q) ~ II) en c: :c t 0 Z 0 g 0 OJ II .J::. 0 .£; ió (ij 0 II) Vertical Origin: Horizontal Origin: Measurement Units: North Reference: . ~ _. .... ^^ n.... ^^^ Scale: 1 inch = 800ft o o Scale: 1 inch = 800ft Wel: Horizonlal Coordinates: Ref. Global Coordinates: Ref. Structure: Ref. Geographical Coordinates: RKB Elevation: North Refererce : Units: MPS-Pad MPS-09 WP-04 DrillQuest" 800 I 2400 I Eastings (Well) 3200 I 6400 I 4000 I 4800 I 5600 I 1600 I t,,~P£~G..9 T~ T 0P GA ~~,~~_~:it~~.;. 12S8A2 N. 5??2.75 E T~i1g- l - 1600 MPS·G9 T2 Top GS Po1nt T~:u.Gt 44(n "DO TVD. :2?~S_~:3 N.. 523:i ¿-is E .à Total Depth: 8965.OOfIMD,4637.00.OOfIlVD :'> ¡ f~1:P.S··09 GB~·P~;'l . S~~~:g, Sides: SÔO.i)01t ¡ ,i340.tYJ T'.:D. -;258.42 N. f-~772]5 E egin Dir @ 4.000'/10011 : 7840.6211 MD, 4014.78f1lVD - 800 Q) ~ II) en c: :c t o Z ~ MPS·O~ TD P')Er:t T arget 45~&_C...,,} 1'lO. 1359.90 N. 5Ç97.03 E o è5 o OJ II .J::. o .£; 2700.1\ ió (ij o en rod Dir, Start Sail @ 74.799': 3753.45f1MD,2943.14f1lVD I 800 I 1600 I 6400 Reference is True North I 2400 I 3200 Eastings (Well) I 4000 I 4800 I 5600 Current Well Properties MPS-09 Wp-04 Draft 6000013.87 N, 565960.74 E 42.26 N, 383.90 W 70° 24' 37.7149' N, 149° 27' 46.4250' W Measurement Units: Single Well Target Data for MPS-09 ft Coordinate Point TVD SSTVD Northings Eastings ASP-4 Northings ASp·4 Eastings Type Entry Point 4364.30 4292.30 1280.48 N 5785.79 E 6001345.40 N 571735'<JO E Entry Point 4414.80 4342.80 1292.15 N 5846.50E 6001357.00 N 571795.ooE Entry Point 4586.40 4514.40 1333.06 N 0026.77 E 6001400.10 N 571975.50 E Entry Point 4359.00 4287.00 1022.12N 4648.47 E 6001077.00 N 570600.00 E Entry Point 4414.80 4342.80 1292.15 N 5846.50 E 6001357.00 N 571795.ooE Entry Point 4340.00 4268.00 1258.42 N 5772.75 E 6001323.22 N 571722.15 E Boundary Point A 4340.00 4268.00 1116.56 N 5749.97 E 6001181.17 N 571700.62 E B 4340.00 4268.00 1112.15 N 6249.95 E 6001181.17 N 572200.62 E C 4340.00 4268.00 1612.13 N 6254.36 E 6001681.17 N 572200.62 E D 4340.00 4268.00 1616.54 N 5754.38 E 6001681.17 N 571 700.62 E Entry Point 4340.00 4268.00 1258.42 N 5772.75 E 6001323.22 N 571722.15 E Entry Point 4401.00 4329.00 1285.93 N 5833.55 E 6001351.27 N 571782.71 E Point 72.0011 above Mean Sea level 72.001I above Strucllre Target Name Target Shape -' True North Feet (US) 1IT1 1TI2 Point Point Proposal Data for MS-09 Wp04 Pilot Point Well Well ft True North O.IXJO O.IXJO 4.500 37.1XJO 37.1XJO 74.799 74.799 47.573 47.573 47.573 O.IXJO O.IXJO 14O.1XJO 14O.1XJO 14O.1XJO 66.855 66.855 65.654 65.654 65.654 Dogleg seventy: Degrees per 100 feet (US) Verllcal Section Azirruth : 77 .230° Vertical Section Description:Wel Vertical Section Origin: 0.00 N,O.DO E Measured Incl. Azlm. Depth 0.00 200.00 500.00 1933.17 2058.38 3753.45 7840.62 8521.77 8612.19 8962.00 Vertical Depth 0.00 200.00 499.69 1822.00 1922.00 2943. J 4 4014.78 4340.00 4401.00 4637.00 1IT3 Point MPS-06 Pilot MPS-06 TI Point MPS-09 Goo-Poly Polygon Northlngs Eastings Vertical Dogleg Section Rate O.OON O.OOE 0.00 MPS-09 TI Top OA O.OON O.OOE 0.00 O.IXJO 9.02S 7.57E 5.39 1.500 MPS-09 1"2 Top OB 392.79 S 329.59 E 234.62 2.268 450.52 S 378.03 E 269.10 O.IXJO 529.17 S 1604.53 E 1447.88 4.1XJO 1021.11 N 5231.26 E 5327.57 O.IXJO J 258.42 N 5772.75 E 5908.12 4.1XJO J 285.93 N 5833.55 E 5973.50 O.IXJO 1392.38 N 6068.80 E 6149.28 0.001 Point -I -, '"."Y'-!5f..I1 BPXA j,)AJL.LINIiII ...."..,h..~s Milne Point Unit ... ti;t_~ ç.,.o......( Q) ~ .c ã. ( ) ~ 2400 - cO () t ( ) > .::: o o ex> II £. o .S å) (ij o en 4800 - ~-"II_..__~'" 1'\"',..'" ....^^ Scale: 1 inch = 800ft o Vertical Section (Well) 3200 I 4800 I 4000 I 1600 I 2400 I 800 I o /OP: Start Dir@ 1.500'/10011: 2oo.OOIIMD,2oo.OOIITVD increase BLiId Rate" 2.268'/10011 ¡OOoo 800 - I 000.00 1500.00 1 600 - \ ~nd Dir, Start sail@37.ooo':1933.17I1MD.,1822.OOIITVD (. .Æegin Dir @ 4.000'/10011 : 2058.3811 MD. 1922.001I TVD .00 1I..I,r !'~r!"!Jf·.,I: 3200 - nd Dir, Start Sail @ 74.799' : 3753.45I1MD,2943.14I1TVD r",:~(~;.~~:, MPS-Pad MPS-09 DrillQuest~ Section Azimuth: 77.230° (True North) 5600 6400 I I o - 800 --- - 1600 Q) ~ .c ã. ( ) - 2400 ~ cO () t ( ) > - 3200 Begin Dir @ 4.000'/1001I : 7840.6211 MD, 4014.7811 TVD .-- End Dir, Start Sail @ 47.573': 8521.77I1MD,434O OOIITYJ H?S·()9 T' Top ÜiI. 00 / - 4000 1-340.00 Tvû. :~<:5ÚA2 N. -S?f'2J5 E ~ / S'1"a,.". SidBs: 50();,~:~.",-..¡ íL" ,",' ~)B "-'.. ~":,... í" Id Angie ; 47.573 g é "1< ~~ r"" < "3- ."".. -A-- -<; . '~.O?""'" ex> -S~~~r~-' B ;:s. {¿~~;; ;~t ~ ~~-~~ ~'- ;:'~ - ~,.¡ ~ ~~:11~ Z~;~ ~5~; ;~tN "<'Q7 (>3 c~ 7' C~ .~ å) (ij o ~ 4800 en 4000 - "f',}> {:~;. ;J~ .':.·,··.:.,....s-\ 4,",£;11 S(1;;ø,!.õ,\ß .,...·I¡(¡."";.....t.i..,....·t· 4J4Ã:;:J <o;..!~",.!'r.\"f ':l!'!J.lJf ~'>F~: (I':!;.:/:.;;) 7"5~;:~:,-~¡ .~!MJ ~¡...~;:~::~, o Scale: 1 inch = 800ft I 800 I 4800 I 1600 I 2400 I 3200 Vertical Section (Well) I 4000 Total Depth: 8962.OOIIMD,4637.OOIITVD I 5600 6400 Section Azimuth: 77.230° (True North) ,,',j . ,... ~'; ~;" Field: Milne Point Well: S-09i DIRECTIONAL LWD OPEN HOLE LOGGING NONE NONE MWD/GR/RES IFR/CAS 1/22/2002 FORM 250 % Excess Base of Permafrost 40 % Excess Top of Tail Cement Top of N sand OA sand OB sand Total Depth ) BP EXPLORATION Milne Point Unit MPS-09i Actual Surface Location: 3345' FSL & 49' FEL Bottom Hole Location: 4702' FSL & 4107' FEL Status: not drilled DEPTH MD I TVD 110' 1,933' 1,750' 7,750' vi' 8,250' 4,177' 8,521' 4,340' 8,216' 4,401' 8,855' 4,565' 110' HOLE SIZE 97/8" MXC-1 ) ENG: Steve Campbell RIG: Nabors 27E RKB: 68' CASING SPECS MUD INFO PIT INFO 42 20" 92# H-40 Welded Insulated Lead Cement Volume ./ 702.9 bbls 950 Sacks Tail Cement Volume / 76.0 bbls..... 371 Sacks Production Casing 7" 26# L-80 BT&C MW = 9.2 INFORMATION Wellhead FMC Gen 6 20" x 11" 5M KOP @ 200' EOB @3753' AA';;75 VS=1447' SOD @ 7840' EOD @ 8521' AA=48 VS=5908' MPS-9i well plan schematic.xls '). J ') H 202458 DATE 12/07/01 CHECK NO. 00202458 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS 100.00 VENDOR ALASKAO I LA DISCOUNT NET 100.00 00 120501 CK120501H PYMT COMMENTS: HANDLING INST: Pernit to Drill ~ee S/H - Terrie Hub)le X4628 -"-yY\ps- 09 ' R~CE'VED ~)rAN 2 3 I 2002 AlaSka Oil & G ~ aSCons C . Anchorag~ ommlssion tE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ 100.00 100.00 BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAG E, ALASKA 99519-6612 FIRST NATIONAL BANK OF ASHLAND AN AFFIUATE OF NATIONAL CITY BANK CLEVELAND, OHIO No. H 202458 CONSOLIDATED COMMERCIAL ACCOUNT 56·389 """4"12 00202458 PAY ONE HUNDRED & 00/100************************************* US DOLLAR DATE 12/07/01 AMOUNT $100.00 To The ORDER Of ALASKA OIL AND GAS CONSERVATION COMMISSION 333 WEST 7TH AVENUE SUITE 100 ANCHORAGE AK 99501 NOT VALID AFTER 120 DAYS n"" \ (..-J f?~!J.-... III 2 0 2 L, 5 8 III I: 0 l. ~ 2 0 3 8 ~ 5 I: 0 0 a ........ ~ ~ III '~i~ " J ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERJPARAGRAPHS TO BE INCLUDED IN TRANSlVllTTAL LETTER ;7/¡:J¿¿ ~-~~ CHECK 1 ST ANDARD LETTER DEVELOPMENT DEVELOPMENT REDRJLL EXPLORA TION INJECTI7 INJECTION WELL RED RILL WELL NAME CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) PILOT HOLE (PH) ANNULAR DISPOSAL ~o ANNULAR DISPOSAL <--> YES ANNULAR DISPOSAL THIS WELL "CLUE" The permit is for a Dew wellbore segment of existing weD ~ Permit No, ,API No. ' Production should continue to be reported as a function of the original API number stated above. ' In accordance with 2,0 AAC 25.005(1), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for wel~ (n8:me on permit). Annular disposal has ~ot been requested. . . Annular Disposal, of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved. . . DISPOSAL INTO OTHER Please note that an disposal of fluids generated. '. . ANNULUS <--> YES + SP ACING EXCEPTION Templates are located m drive\jody\templates Enclosed is the approved application for permit to drill the above referenced well. The permit is approved' ,sùbject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) will assume the liability of any protest to the spacing exception that may occur. /J? P«. /' COMPANY~)C WELL NAME 6 -7" PROGRAM: exp _ dev ~ redrll _ serv ~ wellbore seg _ann. disposal para req _ INIT CLASS ~cR I ¿¿,;/AJ,J GEOL AREA gqD UNIT# 0/ / 3~ ON/OFF SHORE 01'1 Y N Y N 1. Permit fee attached. . . . . . . '.' . ~:¡..¡"" . . . .L/o. . 2. Lease number appropriate.:¥ 5u ¡e:t. . ! . I'~ .¡.Ii? ~ . ! . 3. Unique well name and number. .. . . . . . . . . . . . . . . . 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . 5. Well located proper distance from drilling unit boundary. 6. Well located proper distance from other wells.. . 7. Sufficient acreage available' in drilling unit.. . . . . . . . 8. If deviated, is wellbóre plat induded.. . . . . . . . . . . 9. Operator only affected party.. . . . . . . . . . . . . . . . . . 10. Operator has appropriate bond in force. . . . . . . . . . 11. Permit can be issued without conservation order. . . . . . . . A~. P ~ DATE 12. Permit can·be issued without administrative approval.. . . . . þ(J ~I {-O~·13. Can permit be approved before 15-day wait.. . . . . . . . . . ENGINEERING 14. Conductor string provided . . . . . . . . .. . . . . . . . . . 15. Surface casing protects all known USDWs. . . . . . . . 16. CMT vol adequate to circulate on conductor & surf csg. . . . . 17. CMT vol adequate to ,tie-in long string to surf csg. . . . . . . . 18. CMT will cover all known productive horizons. . . . . '. . . . . 19. Casing designs adequate for C, T. 8 & permafrost. . . . . . . 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 21. If a re-drill, has a 10-403 for abandonment been approved. . . 22. Adequate well bore separation proposed.. . . . . . . . . . . . 23. If diverter required, does it meet regulations . . . . . . . . . . 24. Drilling .fluid program schematic & equip list adequate. . . . . 25. 80PEs. do they meet regulation . . . . . . . . . . . . . . . . 26. BOPE press rating appropriate; test to psig. . 27. Choke' manifold complies w/API RP-53 (May 84). . . . . . . . 28. Work. will occur without operation shutdown. . . . . . . . . . . 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . 30. Permit can be issued w/o hydrogen sulfide measures. /Y}N ../ . /' 31. Data presented on potential overpressure zones. . . . . . . ~ y &-*-+1;<'-/.' ··Ie 'J.__í.A_£;~}__'_""¡~'( ¡{/Lch"'7!è,.S. /-'¡,;r);~ '¿~':':î. ~¡ ¡.(.."þ<.'J.ý-l ,4 32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . . . .. ~ ~ . <- 3ÒC~ I "'1"L.D.s:<. . !-KZ.¿ ~-d b::..';¡:;;s-t.6 ~_ ,þ.e.¡'1.IZ-~'~ t~F ~~Þ<..-- APJ1,.R DATE 33. Seabed cond,bon sUlVey fof off-shore). . . . . . .._.~.~ ¡J Y N "¿<<>4-<.., ~".. (J/;;> 1 c....,,;; L·<"··iÆ - L-YtJ::;e. L .,LLd .,4) b.> ¿.·r;,.f -~-<I? C:: /;-I¿d /~.r~ '"2~' I· D '2.--34. Contact name/phone for weekly progress reports [~ratory only] Y N // () ~ ANNULAR DISPOSAL35. With proper cementing records. this plan . (A) will contain waste in a suitable receiving zone; . . . . . . . (8) will not contaminate freshwater; or cause drilling waste. " to surface; . (C) will not impair mechanical integrity pf the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 MC 25.252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING:' UIC/Annular COMMISSION: RÞð gL- ~ /' WM '8?s S ~ . +~I;,\ k"1>p-l':i JMH 1\f+ J (" { t {'!' t~{A."t,I,,,!,,,,:,:',,,( WELL PERMIT CHECKLIST , FIELD & POOL ..5?;~2S- / s/D ADMINISTRA TION APPR D!\~ l'tGA- 2/4tp'- ~ r--/~ GEOLOGY APPR DATE fll'fT ,I ./ ,~ /' ~\,' i, c:\msoffice\wordian\diana\checklist (rev. 11/011100) ~~ ~c:4.,4'r;~ ~ A-:J:>L 3g0/CJ7'/ -fr /P")'Z'.et ~·I¿.yvcR ~ ~:D. ~ AZ>i- 3'$D//O, ..4- ¡/ . N N N N Y N ~ N ~t €J J' S (, V (). . ._ / . . _~ ~ _ __. , - N r~¡¡;;~~ ~4rJ ..c~~rI-/..~, e[?.sç(i5"05 TV~ f~---'--., .:ft~~ c·~. Nt}þ Iý'r ~.fe¿¡" ~',~:-"1,"~~J 1;-~\.h~J ¿{S~ 7'i/I(;'1~i5' r.J ,",--~t,../I ~,-~. ' . Y N /'JIf-.T~ ¿;··fl9J. u:¡e(~ J/11¡--Zé 11-·/ ~-."d . 1:-¡4:U:"~<; /rJ4.dltPc- #( f,1......d:íc:'i.I-+,- ~ N ~n/ ~ 0/.. C"fj""".h--r- c;;.r:ë...1 '? 5'CY:)rv. D t4. -:f 2öC:> -- ~C:::i) ~.I /7/AL. N {jP;:;' I ¿;<'Yila..-< ..;;~~ r,·.-,M.... 2-&>c:c>.- 3icc/ rvr:> ~Ct:¥]dud .c:c..kL.,.f- .3ZCCJ . N·~.... .~pµ ,ß-l /uqk.< '¿dA"!,W¿;~ /2.lj¿R~UlJ~:A! ~~/<~C.J ---'::;;2("21?(nt. ~ Ai/A. ~ N ;/éC) # Z /, -;i-t.'''';'; ,þ-- '-L/-J::::v:r:'h8¿-t.- -fe,., ""¡'I-C-:/t....¿.LL ~·····/~d ·~¿/~W I , N . , N tJ: ovb-o ~~ '2..1 G. , N ' . Y NMI\SP,::~'S¡'fpÇ.¿. ' ¡.iIA ~ ~ j).:¡1{e-,,-¥--r Ç¡.J 1 - iv; ßo(}&, Y~ Y N Y N Ak cw.. Vl Jew J;, Ç.fD Ç.u-I t" 'l' r t<1 C; :þ J . Com ments/lnstructions: d-/5) (;).À '0 0 Z ( 0 -t :E ::0 -t m Z -t J: en > ::0 ( m > ) ) Well History File APPENDIX Information of detailed nature that is riot particularly germane to the Well Pennilting Process but is part of the history file. To improve the readability of the Well History file and to sim,plify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. :,) é)O¿;)- o~ 0 109'17 Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Jun 13 10:35:27 2002 Reel Header Service name... . . . . . . . . . .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 / 0 6 / 13 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .02/06/13 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point Unit MWD / MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-9i 500292306700 B.P. Exploration (Alaska) Inc. Sperry-Sun Drilling Services 13-JUN-02 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 1 AK-MW-22033 V. LOPEZ C. DIXON MWDRUN 2 AK-MW-22033 V. LOPEZ L. BROWN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 1934 49 MSL 0) 73.20 39.20 # WELL CASING RECORD 1ST STRING 2ND STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 20.000 113.0 ) ) 3RD STRING PRODUCTION STRING # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1 AND 2 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4), AND PRESSURE WHILE DRILLING (PWD). 4. LOG AND DIGITAL DATA ONLY WERE SHIFTED TO A SCHLUMBERGERCASED- HOLE GAMMA RAY LOG RUN IN MPS-09 ON 26 APRIL 2002. THESE PDC DATA WERE PROVIDED TO SSDS BY DEWAYNE SCHNORR ON 11 JUNE 2002. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. 5. MWD RUNS 1 AND 2 REPRESENT WELL MPS-09 WITH API#: 50-029-23067-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8924.5'MD/4585'TVD (SHIFTED DEPTHS) . SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP RESISTIVITY) . SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/06/13 Maximum Physical Record. .65535 File Type.. . . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR FET 1 and clipped curves; all bit runs merged. .5000 START DEPTH 75.0 99.5 STOP DEPTH 8886.5 8879.0 ) ) RPD 99.5 8879.0 RPM 99.5 8879.0 RPS 99.5 8879.0 RPX 99.5 8879.0 ROP 111.5 8924.5 $ # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ----- BASELINE DEPTH GR 67.0 68.0 7721.0 7722.0 7742.5 7741.5 7789.5 7785.5 7818.0 7813.0 7850.0 7847.0 7880.5 7880.5 7900.5 7901.0 7931.0 7930.5 7943.0 7947.5 7958.0 7961.0 7971.0 7972.0 8003.0 8002.0 8014.0 8013.5 8056.5 8055.0 8104.0 8103.5 8166.5 8164.0 8182.5 8179.0 8206.0 8205.0 8246.5 8245.0 8301.5 8301.0 8315.0 8315.0 8338.0 8337.0 8356.5 8354.5 8377.5 8378.0 8380.0 8379.0 8426.0 8424.5 8480.0 8481.5 8493.5 8494.0 8543.0 8542.0 8551.0 8551.0 8558.5 8559.5 8598.5 8597.0 8645.5 8643.0 8653.0 8650.5 8684.5 8682.5 8730.0 8728.5 8745.0 8743.0 8771.5 8770.0 8924.5 8923.0 $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 76.0 4077.0 MWD 2 4077.0 8923.0 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O ) Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 75 8924.5 4499.75 17700 75 8924.5 ROP MWD FT/H 0.98 1225.71 262.001 17627 111.5 8924.5 GR MWD API 10.55 121.44 66.3882 17624 75 8886.5 RPX MWD OHMM 0.13 1047.84 29.9814 17560 99.5 8879 RPS MWD OHMM 0.15 1644.47 39.8507 17560 99.5 8879 RPM MWD OHMM 0.32 1988.06 43.8795 17560 99.5 8879 RPD MWD OHMM 0.11 2000 44.0102 17560 99.5 8879 FET MWD HOUR 0.0522 15.0789 0.533569 17560 99.5 8879 First Reading For Entire File......... .75 Last Reading For Entire File.......... .8924.5 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/06/13 Maximum Physical Record. .65535 F i 1 e Type................ LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/06/13 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: 2 header data for each bit run in separate files. 1 DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPX FET RPD RPS RPM ROP $ " .5000 START DEPTH 76.0 100.5 100.5 100.5 100.5 100.5 112.5 STOP DEPTH 4039.0 4032.0 4032.0 4032.0 4032.0 4032.0 4077.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ # BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down 23-FEB-02 Insite 66.37 Memory 4077.0 75.0 4077.0 .6 76.7 TOOL NUMBER 2385HWRG6 2385HWRG6 9.875 SPUDMUD 9.10 123.0 8.0 600 11.2 2.400 1.870 5.000 6.000 50.0 65.9 50.0 50.0 ) ") Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 RPX MWD010 OHMM 4 1 68 12 4 RPS MWD010 OHMM 4 1 68 16 5 RPM MWD010 OHMM 4 1 68 20 6 RPD MWD010 OHMM 4 1 68 24 7 FET MWD010 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 76 4077 2076.5 8003 76 4077 ROP MWD010 FT/H 0.98 835.36 181.821 7930 112.5 4077 GR MWD010 API 10.55 121.44 63.5639 7927 76 4039 RPX MWD010 OHMM 0.13 1047.84 43.9139 7864 100.5 4032 RPS MWD010 OHMM 0.15 1644.47 64.8672 7864 100.5 4032 RPM MWD010 OHMM 0.32 1988.06 75.2649 7864 100.5 4032 RPD MWD010 OHMM 0.11 2000 73.5106 7864 100.5 4032 FET MWD010 HOUR 0.1208 1.4927 0.452409 7864 100.5 4032 First Reading For Entire File......... .76 Last Reading For Entire File.......... .4077 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/06/13 Maximum Physical Record. .65535 File Type... . . . . . . . . . . . . . LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/06/13 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: 3 header data for each bit run in separate files. 2 .5000 ) # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ START DEPTH 4032.5 4032.5 4032.5 4032.5 4032.5 4039.5 4077.5 STOP DEPTH 8877.5 8877.5 8877.5 8877.5 8877.5 8885.0 8923.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet ) 25-FEB-02 Insite 66.37 Memory 8923.0 4077.0 8923.0 .6 77.9 TOOL NUMBER 2385HWRG6 2385HWRG6 9.875 LSND 9.30 116.0 8.0 450 5.5 1.650 1.170 5.000 4.600 60.0 87.0 60.0 60.0 ) ) Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT FT/H API OHMM OHMM OHMM OHMM HOUR Size 4 4 4 4 4 4 4 4 Nsam Rep 1 68 1 68 1 68 1 68 1 68 1 68 1 68 1 68 Code Offset o 4 8 12 16 20 24 28 Channel 1 2 3 4 5 6 7 8 Name DEPT ROP GR RPX RPS RPM RPD FET MWD020 MWD020 MWD020 MWD020 MWD020 MWD020 MWD020 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4032.5 8923 6477.75 9782 4032.5 8923 ROP MWD020 FT/H 2.62 1225.71 327.131 9692 4077.5 8923 GR MWD020 API 16.69 120.51 68.7094 9692 4039.5 8885 RPX MWD020 OHMM 1.65 605.06 18.6815 9691 4032.5 8877.5 RPS MWD020 OHMM 1.61 506.7 19.5625 9691 4032.5 8877.5 RPM MWD020 OHMM 1.53 291.13 18.4267 9691 4032.5 8877.5 RPD MWD020 OHMM 1.72 367.77 20.089 9691 4032.5 8877.5 FET MWD020 HOUR 0.0522 15.0789 0.599395 9691 4032.5 8877.5 First Reading For Entire File......;.. .4032.5 Last Reading For Entire File.......... .8923 File Trailer Service name............ .STSLIB.003 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .02/06/13 Maximum Physical Record. .65535 File Type................LO Next File Name.......... .STSLIB.004 Physical EOF Tape Trailer Service name. . . . . . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . . 02/06/13 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name. . . . . . . . . . . . .LISTPE Date.....................02/06/13 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services ) ) Physical EOF Physical EOF End Of LIS File