Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-079
/Image ¡ .bject Well History File C'- Jer Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
c:2 03 - 0 7 q Well History File Identifier
Page Count from Scanned File: ,() I (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: ~YES NO
Heienl ~arta) Date:8 ~ OS Isl vv-t.D
If NO in stage 1 page(s) discrepancies were found: YES NO
Organizing (done)
o Two-sided 111111111I111111111
RESCAN
vz{color Items:
D Greyscale Items:
DIGITAL DATA
~iskettes, No.3
D Other, NolType:
D Poor Quality Originals:
D Other:
NOTES:
BY:
Helen ~
Project Proofing
BY:
Helen ~
Scanning Preparation
~ x30= 10
BY:
Helen ~. aria
't ~:'I;.IIII;.I j./
Production Scanning
Stage 1
BY:
Stage 1
BY:
Helen Maria
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Helen Maria
Comments about this file:
~scan Needed
I
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
D Logs of various kinds:
D Other::
Date: 'is' ~ ~_ ()5""' 151
1·llr
miJ
VijiJ
+ J () = TOTAL PAGES J 0 0
(Count~€s not intr.lude cover sheet) 1/\ A!J
Date: '6 a~_ ()S 151 V V ~
I
Date: <6 ~~ ð51s1
Date: 151
111111'1111111 J 1111
11I1111111111111111
I
Date: 151
Quality Checked III "11111111111111
• •
~~-r~ -
MICROFILMED
03/01/2008
DO NOT PLACE
..::_.
~~.
~~.~
` -
ANY NEW MATERIAL
UNDER THIS PAGE
F:~I.aserFiche\CvrPgs_Inserts~Microfilm_Marker.doc
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn. : Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 14, 2006
RE: MWD Formation Evaluation Logs: 3S-21, 3S-22, 3S-23, 3S-24.
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
3S-21: ULC-- 803 -03\ ~ I'-ß~
Digital Log Images:
50-103-20452-00
1 CD Rom
3S-22: U::cc... QD3-0 II ~ ~ /"-/3 fo~
Digital Log Images:
50-103-20446-00
1 CD Rom
3S-23: é)ö3 -04S- ~ 1t..¡3~
Digital Log Images:
50-103-20453-01 SCANNED JAN 3 0 2007
3S-24: db3 -0-=4 tlILf3~"'t
Digital Log Images:
50-103-20456-00
1 CD Rom
1 CD Rom
c.iL---
'4!--
e
e
WELL LOG TRAN8MITfAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
February 19, 2004
tv SCOD
RE: MWD Formation Evaluation Logs 3S-24,
AK-MW-2449740
The technical data listed below is being submitted herewith. Please address any problems or concerns
to the attention of:
Rob Kalish, Speny-Sun Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
38-24:
Digital Log Images
50-103-20456-00
/)D3 - 07g
1 CD Rom
@
ðI93{00
~.1 J~~ Àt'\)-
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2005
MD
13656 ,"" ND 6068./
/'
Operator CONOCOPHILLlPS ALASKA INC
Permit to Drill 2030790
Well Name/No. KUPARUK RIV UNIT 35-24
Completion Date 6/21/2003
Completion Status 1-01L
REQUIRED INFORMATION
Mud Log No
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: GRlRes, SCMT
Well Log Information:
Logl Electr
Data Digital Dataset Log Log Run
Type Med/Frmt Number Name Scale Media No
~D Asc Directional Survey final
I~t D Asc Directional Survey final
I
i Rpt LIS Verification 5
~ D Asc Directional Survey final
I ~t-r'
I ~1t.... 2:.~.-t t{
't-E'fY D 11839 US Vorific3tian 5
I
flog Injection Profile 15 Blu
Log
Gradiometer
15
Blu
t/
15
Blu
Log
Pressure
!
I Log
i
:
1
i
i
dog
!
Temperature
15
Blu
5
Blu
Casing collar locator
Current Status P&A
)lÎ(,'-J.. I f ~ ~ ~
API No. 50-103-20456-00-00
UIC N
--~-- - -
Directional Survey Yes
----------
------
(data taken from Logs Portion of Master Well Data Maint)
Interval OHI
Start Stop CH Received Comments
362 13656 Open 7/1/2003 MWD
0 362 Open 7/1/2003 Gyro
4506 13624 Open 6/25/2003
362 13656 Open 7/1/2003
4506 13624 Open 6/25/2003
8400 13520 Case 9/28/2003 Injection ProfilelWarmback
Survey - PSP FBS - CFS - I
Gradio/PresslTemp/GR/CC ~
L
Injection ProfilelWarmback
Survey - PSP FBS - CFS -
Grad io/PresslT em pIG RlCC
L
8400
13520 Case 9/28/2003
8400
13520 Case 9/28/2003
8400
13520 Case 9/28/2003
8400
13520 Case 9/28/2003
Injection ProfilelWarmback
Survey - PSP FBS - CFS -
Grad io/PresslT em pIG RlCC
L
Injection ProfilelWarmback
Survey - PSP FBS - CFS -
Grad io/PresslT em pIG RlCC
L
Injection ProfilelWarmback
Survey - PSP FBS - CFS -
Gradio/PresslT emp/G R/CC
L
------ --- - - -
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2005
Permit to Drill 2030790
Well Name/No. KUPARUK RIV UNIT 3S-24
Operator cONOCOPHILLlPS ALASKA INc
API No. 50-103-20456-00-00
MD 13656
ND 6068
Completion Date 6/21/2003
Completion Status 1-01L
Current Status P&A
UIC N
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
ADDITIONAL INFORM~ON
Well Cored? Y I't:{)
Chips Received? ~
Formation Tops
Gffi
(1)N
Daily History Received?
Analysis
Received?
~.
------- - ---
----------------
Comments:
Compliance Reviewed By:
~
Date: ;;- ~ J:irJ;= ,--~
Randy Thomas
Kuparuk Drilling Team Leader
Drilling & Wells
ConocJP'hiIIi ps
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6830
May 26, 2004
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Well Completion Report for 3S-24 (APD # 203-079/ 304-119)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent P&A operations of the Kuparuk well 3S-24.
If you have any questions regarding this matter, please contact me at 265-6830 or
Kelly McLure at 265-6059.
Sincerely,
T<--~. ~~
R. Thomas
Kuparuk Drilling Team Leader
CPAI Drilling
RT/skad
RECEIVED
MAY 2 7 2004
Alaska Oil & Gas Cons. Commission
Anchorage
ORIS: NA,:.
I{ STATE OF ALASKA I(
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: Oil D
Gas U
GINJ D
2. Operator Name:
WINJ D
WDSPL D
Plugged D Abandoned 0
20AAC 25.105
No. of Completions _
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, AK 99510-0360
4a. Location of Well (Govemmental Section):
Surface: 2565' FNL, 1266' FEL, Sec. 18, T12N, R8E, UM
At Top Productive
Horizon: 730' FNL, 1567' FWL, Sec. 25, T12N, R7E, UM
Total Depth:
999' FNL, 3911' FEL, Sec. 25, T12N, R7E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x-475994 y-
TPI: x- 468709 y-
Total Depth: x- 468510 y-
18. Directional Survey: Yes D No~
21. Logs Run:
GR/Res, SCMT
22.
CASING SIZE WT. PER FT.
16" 62.5#
9.625" 40#
7" 26#
3.5" 9.3#
GRADE
B
L-80
L-80
L-80
Zone-4
Zone-4
Zone-4
5993852
5985154
5984887
Suspended D
20AAC 25.110
Other
5. Da~ Comp., Susp., 2-..?>
or Aband.: Apri~2004
6. Date Spudded:
May 18, 2003
7. Date TD Reached:
June 1,2003
8. KB Elevation (ft):
24' RKB
9. Plug Back Depth (MD + TVD):
10537' MD 14868' TVD
10. Total Depth (MD + TVD):
13656' MD / 6068' TVD
11. Depth where SSSV set:
Landing Nipple @ 521'
19. Water Depth, if Offshore:
N/A
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD
TOP BOTTOM TOP BOTTOM
Surface 108' Surface 108'
Surface 4527' Surface 2613'
Surface 11255' Surface 5139'
11116' 13650' 5139' 6066'
10497' 10509' 4852' 4856'
23. Perforations open to Production (MD + TVD of Top and Bottom
Interval, Size and Number; if none, state "none"):
perfs squeezed off
26.
Date First Production
n/a
Date of Test
24.
SIZE
nla
WAGD
1b. Well Class:
Development 0 Exploratory D
Service D Stratigraphic Test D
þ b J 12. Permit to Drill Number.
5-- ;:.CJ . ('1 203-079 I 304-119
13. API Number.
50-1 03-20456-00
14. Well Name and Number:
3S-24
15. Field/Pool(s):
Kuparuk River Field
Kuparuk Oil Pool
16. Property Designation:
ADL 380107 & 25551
17. Land Use Permit:
ALK 2616 & 2639
20. Thickness of
feet MSL Permafrost:
HOLE
SIZE
12.25"
6.125"
1740' MD
AMOUNT
CEMENTING RECORD
PULLED
42"
81 sx ArcticCrete
525 sx AS III Lite, 415 sx LiteCrete
184 sx LiteCrete
950 sx Class G
casing window
8.5"
TUBING RECORD
DEPTH SET (MD)
n/a
PACKER SET
11116', 13200'
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
13043'-13362' 15.8 ppg Class G
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
I" Abandoned
OIL-BBL GAS-MCF
Production for
Test Period n>
Flow Tubing Casing Pressure Calculated
press. psi 24-Hour Rate ->
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". ~ ~ '" <t~"::'':~ 1ft'¥! ~b"¡ O'''\4f~f:;;~'-~+ R E C E IVE 0
q. 0- S ~ NONE ::~.;_ i MAY 2 7 2004
i.~·2:r·::~·t Alaska Oil & Gas Cons. Commission
Anchorage
Hours Tested
Form 10-407 Revised 12/2003
OIL-BBL
W A TER-BBL
GAS-MCF
WATER-BBL
CONTINUED ON REVERSE
n f:\ , .~ , "'" ...~. t_
CHOKE SIZE
GAS-Oil RATIO
OIL GRAVITY - API (corr)
RBDMSBfl
JUM047 ..
~f
28.
29.
(
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None".
n/a
N/A
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Schematic
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Kelly McLure @ 265-6059
Printed N~. Randv Thc¡>mas Title:
Signature l ~ "~Phone
Kuparuk Drilling Team Leader
20)" 6-B 3ð
Date
~/'L~(b (
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none",
Item 29: List all test information. If none, state "None".
Form 1 0-407 Revised 2/2003
NIP (521-522,
OD:4.520)
TUBING
(24-11154,
OD:3.500.
ID:2.992)
"RODUCTION
(26-11255.
OD:7.000,
Wt:26.00)
SLEEVE-O
:11071-11072,
OD:4.490)
TIE BACK
:11104-11105.
OD:5.750)
PACKER
:11116-11117,
OD:7.000)
SQUEEZE
:13043-13362)
LINER
:11104-13650,
OD:3.500,
Wt:9.30)
Perf
:13294-13302) "
FRAC
:13294-13311)
Perf
:13296-13311)
Perf
:13302-13332)
Perf
:13332-13362)
',~
KRU
35-24
ConocoPhillips Alaska, Inc.
3S-24
~-~
~
I~ ..
\~ "!Ii
, -.: """I
.. I;'
~
~:¡ '"f
~.~- -,j
II: : \
,^ :J I
¡:I~-~I,
:I ~
II. :
'II1./1iijnr "1'
¡ \¡ 'Ir~~rJl: r;; ,
I . ~
í r ~I'
I i
~-~:
~ . 'I
~ ì
... I'-
API: 501032045600
SSSV Type: NIPPLE
Well Type: PROD
Orig 6/12/2003
Completion:
Last W/O:
Angle @ TS: 67 deg @ 13296
Angle @ TD: 67 deg @ 13656
Annular Fluid:
Rev Reason: Set Retainer, CMT
saz, Pull OV
Last Update: 4/28/2004
Reference Log: 24.3' RKB
Last Tag: 13326
Last Tag Date: 3/24/2004
Casing String - ALL STRINGS
Description
PRODUCTION
SURFACE
CONDUCTOR
Casing String - LINER
Description
LINER
Tubing String - TUBING
Size I Top
3.500 24
Perforations. Summary
Interval TVD
13294 - 13362 5929 - 5955
13362 - 13370 5955 - 5959
Ref Log Date:
TD: 13656 ftKB
Max Hole Angle: 70 deg @ 3853
Size Top Bottom TVD Wt Grade Thread
7.000 26 11255 5139 26.00 L-80 BTCM
9.625 28 4527 2613 40.00 L-80 BTCM
16.000 28 108 108 62.50 H-40 WELDED
Size Top Bottom TVD Wt I Grade I Thread
3.500 11104 13650 6066 9.30 EUE8RD
Bottom TVD Wt Grade Thread
11154 5102 9.30 L-80 EUE8RD
Zone Status Ft SPF Date Type Comment
C-4 68 0 4/22/2004
C-4 8 6 6/22/2003 IPERF 2.5" HSD PJ, 60 deg phase
- 4 runs
Stimulatlol1s&.TreatI'n8I1tS
Interval Date Type
13294 - 13311 11/3/2003 FRAC
13043 -13362 4/22/2004 SQUEEZE
Comment
90M# 16/20 CARBOLlTE
CEMENT SQUEEZE W/15.8 PPG CLASS G CEMENT; 6
BBLS SQUEEZES INTO PERFS BELOW RETAINER, 5
BBLS CEMENT ON TOP OF RETAINER
Man Man Type V Mfr V Type V
Mfr
1 4241 2505 CAMCO KBUG DMY 1.0 BK 0.000 0
2 7804 3852 CAMCO KBUG DMY 1.0 BK 0.000 0
3 9912 4630 CAMCO KBUG DMY 1.0 BK 0.000 0
4 11019 5051 CAMCO KBUG EMPTY 1.0 BK 0.000 0
1. BROKEN LATCH IN POCKET (.25" PORT), RECOVERED LATCH
Other (plugs,. equip., etc.) - JEWELRY
Depth TVD Type Description
521 519 NIP CAMCO 'DS' LANDING NIPPLE WINO GO PROFILE
11071 5071 SLEEVE-O BAKER CMU SLIDING SLEEVE W/CAMCO 2.812" DS PROFILE
11117 5088 SEAL BAKER G-22 LOCATOR SUB/SEAL ASSEMBLY GBH-22
11154 5102 TTL
OthEir(plugs, Eiqulp., Eitc.)- LINER JEWELRY
Depth TVD Type
11104 5084 TIE BACK TIE BACK SLEEVE
11116 5088 PACKER BAKER ZXP LINER TOP ISOLATION PACKER WIHR PROFILE
11126 5092 HANGER BAKER FLEX LOCK HANGER
11135 5095 SBE BAKER 20' SEAL BORE EXTENSION
11154 5102 XO
13196 5890 Marker
Joint
PACKER 3.5" EZSV SQUEEZE PACKER set 4/19/204
SHOE 'V' SET FLOAT SHOE
St
MD
ID
2.875
2.812
3.000
2.992
Description
ID
5.250
5.000
4.410
4.000
3.500
2.992
13200 5892
13648 6065
General. Notes
Date Note
6/11/2003 TREE: GMC I GEN 51 5M
TREE CONNECTION: TOP 5.75" ACME with 3.5" EUE8RD THREAD
8/1/2003 LOST 2.57" X .250" ElL ROLLER WHEEL IN HOLE
1.812
2.992
'\. 3S-24 Well Events Summary
Date Summary
01/09/04 TAG UP ON ICE AT 21681 CTMD. JET THROUGH ICE PLUGS AND
STRINGERS TO 33001 CTMD PUMPING HOT DIESEL WITH 1.75" DOWNJET
NOZZLE, TAKING RETURNS TO FACILITY. RIH TO 50001 CTMD, AND SHUT
CHOKE TO PERFORM INJECTIVITY TEST OF 1 BPM AT 1800 PSI.O
[Hyd rates-Ice]
02/21/04 DRIFT TBG TO 18701 SLM. ENCOUNTERED HYDRATES. IN PROGRESS.O
[Tag, Hydrates-Ice]
02/22/04 CLEAN UP HYDRATES TO 3183' SLM. LEFT 11 BBL MeOH IN TBG TO SOAK.
o
[Hyd rates-Ice]
03/15/04 JET ICE PLUG W /2" DOWN JET NOZZLE AND 2" CK FROM 34841 TO 35431
WITH 60/40 METH, COMPLETED 5 BBL INJECTIVITY TEST AT 37701 WHP=
640 PSI, CTP = 3680 PSI @ INJ RATE 1.6 BPM, RIH W/ COIL TO 45001 WHILE
CIRCULATING DOWN FLOW LINE; POOH W/ NOT CIRCULATING.
03/24/04 TAGGED FILL @ 133261 RKB, EST. 441 FILL. SET 2.81 CS LOCK W/ FLOW
THROUGH SUB & TANDEM SPARTEK GAUGES @ 110711 RKB. LITTLE RED
TO IMMEDIATELY BEGIN 1000 BBL INJECTIVITY TEST. RAPID DATA
RECOVERY BEGINS @ 1020 HRS. 032504, DURATION APPROXIMATELY 9
DAYS.
03/24/04 PUMPING SW INJECTIVITY TEST @ 1/2 BPM. IN PROGRESS.
03/25/04 PUMPED 983 BBL SW INJECTIVITY TEST. FREEZE PROTECTING WELL
BORE. IN PROGRESS.
03/26/04 FINISHED FREEZE PROTECTING WELLBORE WITH 17 BBL MEOH & 61 BBL
DSL. DOWNHOLE GAUGES ON RAPID DATA RECOVERY TILL ABOUT
APRIL 3.
04/03/04 PULLED 2.81" CLOCK W/ SPARTEC GAUGES @ 110711 RKB.O
[Pressure Data]
04/19/04 MAKE DRIFT RUNS AND SET 3-1/2" EZSV CEMENT RETAINER @ 132001
RKB.
04/20/04 RIG DOWN SLlCKLlNE EQUIPMENT.
04/22/04 PERFORMED A CEMENT SQUEEZE WITH 15.8 PPG CLASS G CEMENT. 6
,/
BBLS OF CEMENT SQUEEZED INTO PERFORATIONS BELOW RETAINER;
PLACED REMAINING 5 BBLS OF CEMENT ON TOP OF RETAINER.
ESTIMATED TOC =13,050 CTD. WASHED DOWN TO TOC WITH 18 BBLS
BIOZAN GEL & 290 BBLS SW.
04/23/04 TAGGED TOP OF CMT PLUG @ 130431 SLM. TESTED CEMENT PLUG TO ,/
2000 PSI, GOOD TEST. PULLED OV @ 110191 RKB.O
[PT Tbg-Csg]
04/24/04 POT & PPPOT-T & IC passed, MITOA failed, LLR of 1 bpm at 1250 psi, Function
test LDSls 0
[ANN COM ISSUES, WH Maintenance]
04/24/04 LOADED TBG & IA WITH SEAWATER & DSL CAP.
" ~
{
i
;'~::Y:'ll:;<;',;"":' ;;
,',.¡".
'~'1
ConocoPhillips Ala.$~,a. .
"Ç>perations Sumirlsry:':Report
Pag~,1or, $
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
38-24
3S-24
ROT - SIDETRACK
Doyon Drilling Inc
Doyon 141
Start: 4/26/2004
Rig Release: 5/6/2004
Rig Number:
Spud Date: 5/18/2003
End: 5/6/2004
Group:
Dåte, 'From - To' 'Hours, Goete î~~e Phase
Description of Operations
4/26/2004 00:00 - 04:00 4.00 MOVE DMOB DEMOB Blow down rig and prep for rig move
04:00 ~ 12:00 8.00 MOVE MOVE MOVE Hook up complexes and sub to trucks and move rig from 2L to 38 pad
12:00 - 14:00 2.00 MOVE OTHR MOVE Clean up diesel spill wI ACS, Peak and rig crew
14:00 - 15:15 1.25 MOVE POSN RIGUP Lay herculite and mats and spot sub on 3S-24A
15:15 - 17:00 1.75 MOVE POSN RIGUP Lay mats for pits, pumps, motors and boilers and spot modules
17:00 - 18:30 1.50 MOVE POSN RIGUP Lay herculite and spot rockwasher, Lay mats and spot pipeshed
18:30 - 20:30 2.00 MOVE POSN RIGUP Trim berms around rig and spot tioga on pipeshed.
20:30 - 22:00 1.50 MOVE OTHR RIGUP Make interconnects between modules and work on rig acceptance
check list. Rig on highline power at 21 :00 hrs, Rig Accepted @ 2100 hrs
04/26/2004.
22:00 - 00:00 2.00 DRILL OTHR DECOMP Load pipeshed wI 4" d.p.
4/27/2004 00:00 - 02:00 2.00 DRILL OTHR DECaMP Fin loading pipe shed with 4" XT 39 DP and strapped same
02:00 - 02:15 0.25 DRILL SFTY DECOMP Held PJSM on PU & standing back 4" DP
02:15 - 14:30 12.25 DRILL PULD DECOMP PU & stood back in derrick 333 jts (111 stds) of 4" XT 39 DP, PU &
stood back 27 jts (9 stds) of 4" HT 38 HWDP
14:30 - 15:45 1.25 WELCTL OTHR DECOMP Checked well pressure on tree -0- psi, pulled VR plugs on 7" x 3 1/2"
annulus, -0- psi on lA, pulled BPV and installed TWC
15:45 - 16:45 1.00 WELCTL NUND DECOMP ND tree and 11" 5M adapter flange
16:45 - 19:00 2.25 WELCTL NUND DECOMP NU 13 5/8" 5M BOP stack and lines, changed out lower pipe rams from
4" to 3 1/2"
19:00 - 00:00 5.00 WELCTL BOPE DECOMP RU and began testing BOPE, valves, manifold and rams to 250 psi low
and 5,000 psi high, tested annular to 250 psi and 3,500 psi
NOTE: John Spaulding with AOGCC waived witnessing of BOP test
4/28/2004 00:00 - 01 :00 1.00 WELCTL BOPE DECOMP Fin testing BOPE and performed Koomey test, RD test equipment and
pulled TWC
01 :00 - 02:30 1.50 DRILL RIRD DECaMP RU safety valves on 3 1/2" landing jt and back out lockdown screws
02:30 - 02:45 0.25 DRILL PULD DECOMP PU 100K st wt and pulled hanger to rig floor, no problems releasing
hanger or pulling out of seal assembly
02:45 - 03:45 1.00 DRILL PULD DECaMP RU 31/2" tbg tongs and LD landing jt and hanger
03:45 - 05:30 1.75 DRILL CIRC DECaMP Circ hole with clean seawater, displaced out approx 66 bbls diesel used
for freeze protection, staged pump rate up to 6 bpm at 900 psi, st wt
90K
05:30 - 05:45 0.25 DRILL OBSV DECaMP Monitored well-static
05:45 - 06:00 0.25 DRILL SFTY DECaMP Held PJSM on LD 31/2" completion
06:00 - 16:00 1 0.00 DRILL PULD DECOMP POOH LD 31/2" completion assembly, LD 352 jts of 31/2" 9.3# L-80
EUE-Mod, tbg, GLM's with pup jts, DS nipple and seal assembly
(11,127') All completion assembly accounted for
16:00 - 17:30 1.50 WELCTL EORP DECaMP Installed test plug and changed out lower pipe rams from 3 1/2" to 4"
17:30 - 18:00 0.50 WELCTL BOPE DECaMP Tested lower pipe rams to 250 psi then to 5,000 psi, pulled test p'ug
and installed wear bushing
18:00 - 18:15 0.25 LOG SFTY DECaMP Held PJSM with rig crew and Schlumberger wireline on running gauge
ring and junk basket
18:15-21:45 3.50 LOG ELOG DECOMP RU SWS E-line, MU 6.125" gauge ring/junk basket and RIH, began
setting down at 8,500', worked tool down to 9,000' making slow
progress, began POOH, gauge ring/junk basket hung up at 3,535',
21:45 - 22:30 0.75 LOG OTHR DECOMP Worked Gauge ring junk basket at 3,535' for 40 min and worked free,
22:30 - 23:30 1.00 LOG ELOG DECaMP Fin POOH with Gauge ring/junk basket, recovered 3 gals of cuttings in
junk basket, RD SWS
Decision was made to make clean out/gauge run with whipstock mills
23:30 - 00:00 0.50 DRILL PULD DECaMP Brought whipstock mills and cross overs to rig floor, preparing to MU
BHA for clean out/gauge run
4/29/2004 00:00 - 00:30 0.50 DRILL PULD DECOMP Held PJSM and MU cleanout/gauge run BHA #1
00:30 - 01 :00 0.50 RIGMNT RSRV DECaMP Serviced rig & top drive
Printed: 5/24/2004 2:50:23 PM
I.., I
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
ConocoPhili"ips AlaskCl"
Qp.eratiolis· Summary Report.
3S-24
3S-24
ROT - SIDETRACK
Doyon Drilling Inc
Doyon 141
. SUb
From - To. Hours' Code' .Code 'Phase
, ---"
. Date
. . ~.
4/29/2004
01:00 - 04:15
04: 15 - 06:30
06:30 - 08:00
08:00 - 12:00
12:00 - 12:15
12:15 - 14:00
14:00 - 15:30
15:30 - 17:30
17:30 - 19:15
19:15 - 21:30
3.25 DRILL TRIP DECOMP
2.25 DRILL CIRC DECOMP
1.50 RIGMNT RGRP DECOMP
4.00 DRILL TRIP DECOMP
0.25 DRILL PULD DECOMP
1.75 LOG ELOG DECOMP
1.50 LOG
ELOG DECOMP
2.00 LOG ELOG DECOMP
1.75 LOG ELOG DECOMP
2.25 WINDOWPULD DECOMP
21 :30 - 22:00 0.50 WINDOWCIRC DECOMP
22:00 - 00:00 2.00 WINDOwrRIP DECOMP
4/30/2004 00:00 - 01 :15 1.25 WINDowrRIP DECOMP
01:15-02:15 1.00 RIGMNT RSRV DECOMP
02:15 - 02:30 0.25 DRILL DEOT DECOMP
02:30 - 05:15 2.75 WINDOwrRIP DECOMP
. 05:15 - 06:30 1.25 WINDOWSETW DECOMP
06:30 - 08:00
08:00 - 12:00
12:00 - 13:00
1.50 WINDOWCIRC DECOMP
4.00 WINDOWSTWP DECOMP
1.00 WINDOWCIRC DECOMP
13:00 - 14:00 1.00 DRILL FIT DECOMP
14:00 - 19:00 5.00 WINDOwrRIP DECOMP
19:00 - 20:00 1.00 WINDOWPULD DECOMP
20:00 - 21 :00 1.00 WINDOWOTHR DECOMP
21 :00 - 23:15 2.25 DRILL PULD PROD
23: 15 - 23:30 0.25 DRILL SFTY PROD
23:30 - 00:00 0.50 DRILL PULD PROD
5/1/2004 00:00-01:15 1.25 DRILL PULD PROD
.page 20f 5 '
Start: 4/26/2004
Rig Release: 5/6/2004
Rig Number:
Spud Date: 5/18/2003
End: 5/6/2004
Group:
D~scription of Operations
RIH with BHA #1 to 10,821' with no problems, PU 2 stds to 10,634'
Pumped 100 bbl hi vis sweep (150 vis), circ out with clean seawater,
recovered 5-10 gals of cuttings from sweep, circ hole clean at 70 rpm's,
9K ft·lbs torque, staged pump rate up to 8 bpm at 1,500 psi, rot wt
106K, up wt 112K, dn wt 105K
Repaired hyd by-pass on iron roughneck
POOH with BHA #1 to 55', no problems
LD cleanoutlgauge run BHA #1
RU Schlumberger E-line and RIH with 6.125" gauge ringljunk basket to
10,638' with no problems
POOH with gauge ring/junk basket with no problems and LD same, no
recovery in junk basket
RIH with Baker 7" CIBP-arid set same at 10,538'
POOH and LD setting tool, RD SWS
MU & RIH with BHA #2, Bakßr 7" btm trip whipstock and milling
assembly with MWD and oriented same, 4-4 3/4" dc's, RIH with 9 stds
4" HWDP and 1 std 4" DP to 1,146'
Shallow tested MWD at 175 gpm, 450 psi & ck ok, blow down top drive
RIH slow with whipstock on 4" XT 39 DP from 1,146' to 3,860'
Cont RIH slow with Baker 7" btm trip whipstock on 4" DP from 3,860' to
6,009'
Slip & cut 75' of drilling line
Tested 7" csg and CIBP to 1,000 psi for 15 min & ck ok
Cont RIH slow with Baker 7" btm trip whipstock on 4" DP from 6,009' to
10,401'
Est circ at 290 gpm, 1,500 psi and worked DP down orienting whipstock
to 15 deg left of high side from 10,401', tagged CI BP at 10,527' DP
(10,538' WL), set whipstock and sheared off same, st up wt 155K, dn
75K with seawater in hole
Displaced out seawater in well over to new 10.2 ppg LSND mud with
3% lubricants, st wt with mud in hole, rot wt 90K, up wt 130K, dn wt 8SK
Milled window in 7" csg from 10,509' to 10,540' MDI 4,869' TVD, top of
window at 10,509 MD'/4,856' TVD, btm of window 10,521' (12' window,
19' of open hole), 2-3K wt, initial rpm's 65, final rpm's 120, torque aye
6K ft-Ibs, max torque 8K ft-Ibs, circ rate 295 gpm at 1,550 psi
Pumped hi vis fiber sweep and circ hole clean, worked mills thru
window while circ, circ at 295 gpm at 1,550 psi, after circ clean, worked
mills thru window with no pump or rotation several times with no
problems, had good recovery from sweep and magnets while milling
window
RU & performed FIT to 13.1 ppg EMW with 10.2 ppg MW, 725 psi at
4,856' TVD
POOH with milling assembly BHA #2 to 228', stood back HWDP
LD Milling assembly BHA #2, upper mill came out full gauge
Pulled wear bushing and flushed out BOP stack, re-installed wear
bushing
PU & Began MU 6 1/8" directional BHA #3, oriented and uploaded
MWD
Held PJSM with crew on loading radioactive sources
Cont MU BHA #3, loaded radioactive sources and RIH with 3 stds
HWDP to 275'
Fin MU BHA #3 and RIH with HWDP to 1,103', shallow tested MWD
and ck ok
/'
Printed: 5/24/2004 2:50:23 PM
Re: 3S-24 answers
I~·
Subject: Re: 38-24 answers
From: Thomas Maunder <tom _ maunder@admin.state.ak.us>
Date: Fri, 16 Apr 2004 12:49:34 -0800
To: "McLure, Kelly" <Kelly.A.McLure@conocophillips.com>
~o :S-O~~
Thanks Kelly. I agree on the 7", there doesn't appear anything else one could do
and given the breathing it is not surprising that differential sticking became a
problem. The way the reports read, breathing occurred at lower EMWs than would
have been expected. That sort of ties in to the LOTs.
With regard to the LOTs, I do appreciate the need to squeeze given the planned mud
weights. It appears that the break point on the 2nd graph was improved, however
the 440 psi or so it dropped to essentially repeats the latter part of the initial
LOT so I am not sure if the squeeze really achieved any greater ultimate shoe
integrity.
My main point on these issues is that when there is a major departure from what was
planned and permitted, it seems that at least a courtesy notice should be
provided. The operations ultimately performed amount to changes in approved
plans. Such notice keeps us informed and aware.
Again, thanks for the information. If you or your colleagues have any questions,
please call.
Tom Maunder, PE
AOGCC
McLure, Kelly wrote:
Tom, I am attaching the Surface LOT Test sheet the post squeeze LOT, adn the 7'
injectivity test for you to review. Please see below the answers in red and
the attachments.
1""~1~~ sending this to several of you, since I am not sure who will provided the
lanswerS/requests.
i In doing the review of the planned 3S-24A, I have pulled the file of 3S-24 and in
: looking at that summary I have a couple of questions.
',. In reading the well summary, I note there were two events that led to changes in
¡ the planned operations.
! These include:
1. "Low initial LOT" at the surface shoe and a subsequent squeeze.
The first LOT was performed and it leaked off at 432 psi which equates to
11.98 ppg EMW. I know the surface LOT was planned (shown in the wellplan to be
for 11.8 ppg EMW based on a 20 bbl kick tolerance from 11.1 ppg MW, the
equivalent pressure expected at the K-l interval. Therefore, right at the LOT
equivalent, so a squeeze was done for the shoe and then a second LOT performed.
The second LOT showed a pressure of 13.96 ppg EMW. This was sufficient enought
to continue drilling the next hole section. See attachments for LOT data
I sheets.
~2.
Stuck 7" casing with it cemented 2400' off bottom.
The 7" casing run was very uneventful and went as planned until the point we
were stuck. It happened on a connection when we were sitting with the casing in
the slips. Doglegs through that area were 1-2 degrees so that should not have
been a contributor. We have checked in detail the logs as well as the rig 2
second data from digital readouts for pressure, WOB, Block weights, pump strokes,
output, etc. There is no information in the detail breakdown of the event
showing what could have led to stuck pipe. It is our analysis that we were
differentially stuck at that depth. I plan to drill with a lower mud weight for
the sidetrack and instill all the proper drilling practices. It is my intention
the lower mud weight will help decrease or eliminate the chance of stuck pipe on
the sidetrack due to our differentially stuck pipe conclusion.
Should this not completely answer all your questions please give me a call. I
will be out for lunch, but back by Ipm today and in the office all afternoon.
THANKS!
ç'.' I would appreciate receiving further information on item 1.
\. would be a good start.
The lot test sheets
10f2
4/16/20042:10 PM
Re: 3 S- 24 answers
'{
Bn item 2, your actions were appropriate however I feel that some contact should
have been made
regarding the changes to the well design.
I look forward to receiving the LOT documents. Please call with any questions.
Tom Maunder, PE
AOGCC
«3S-24 Surf LOT 1st attempt.xls» «Post SQZ Surf LOT.xls»
..{)~~
7P~
20f2
4/16/20042:10 PM
;:::::::::::::::~:g:1 ~:;;:~::::::::::::::: Vol u me
Pumped Bled Back
1.1 Bbls ..................1 Bbls
Pressure Integrity Test
Pumping Shut-in
Strks psi Min psi
0 0 0 420
2 55 025 395
4 114 05 390
6 205 1 ~
8 290 1 5
10 380 2 ~J5
12 4ï2 25 375
14 545 3 370
16 599 35 370
18 652 4 3135
20 701 4 5 365
22 503 5 36Q
24 454 55 360
26 448 6 360
..
65 360
i 3BO
i5 3-55
8 355
85 355
9 355
95 3.5D~
10
...
6.0 Strk/n-lIn
Pump Rate:
Volume Volume
Pumped ::::::~:1::;:~:: Back
3.1 Bbls ··········..··1 Bbls
.... ... -...
.. .... .... .....
.... ... . .. ... .
... . .... ..-.. .. . .
. ... . ..
.. .... ..-...... .. ...
iiSsli
. . .. .-.. .
.. .....
..... ... -. ....
....... ... ......
.... . ..-... . .
... ... ..,
....... ... -... .. .. ...
~~~i¡iii¡!:¡~!¡¡;¡;¡:¡:¡:¡¡¡~i;i!¡¡¡:¡;¡¡.:i¡::~:¡¡¡;¡;¡~
i:¡I}¡i¡¡¡¡!¡:¡¡¡:¡¡¡¡~!¡¡¡¡¡¡¡!~¡¡¡i¡¡¡¡!i¡¡!¡:¡!:
.. .
....... . .
.. .... - ... .....
. .. ....
.... .... "
. .. ......-..........
.. .. ..
:·~~:::I!:!::;¡¡~:::~:::;!:¡~::::¡:~~::,:::~;¡;~::::~::~
;:;;:;i~:;::::i:;:;;:;::Ij::;::;:;::;;;:;;;~;:::;:::;
Casing Test
Pumping Shut-in
Strks psi Min psi
o 0 0 2500
5 160 1.249~
¡:1:~~:~~!~!1~:~¡~:~~:~¡~¡¡:::¡~ø: 2: 2495:
.......1.5. . . .500 3 2495
.:': /. \,::). ~~:: :,,::!.;.; I::' I' :.... .
'.. .:...·-20=.:...:..670 4 2490
:::::::;:¡::~g:;-::~:~~ ~ '1 ;:~g
..:: ':::::':35~""f165 7 2490
::. :1" -:.' ~.,; (I. ,I,. ::1,1;; - I
::·::::·:4QL133ò 8 249Q
II;;' 16.;:~g'
:·:·:·:·:·:·:·:·:$5.=·:·:Æ¡t~Q 15 2490
(::I:':(:':"!rl :;I:/!;:'It (1,1:')/1 (f I
::::·:::··::ø.Ot:2@Þ 20 2485'
.:.: ·;:.;:::e5L218Q 25 2485
·::):::.:::7oL23$Ö 30 ~ 2485
;·::{¡¡::..:;¡:~~:~:·:~~~I .
.................
.................
.................
~ ·11~!II~¡lj Bbls/Strk ~
Strokes
Volume/Stroke
Volume Input
dO~-a ~ '\
30
40 5 10 15 20 25
Shut-In-time, Minutes
o 'PIT Point
~-1
-...,... ---~-~ ~ -
- Lost 15 psi during test, held 99.4% of
= test pressure.
. .,. . ,I .. .. I I I J .
.?-;.»:!;:i«f!i..*¥;.·s,..~€-~':~~~.s...~.
Comments:
-m- LEAK-OFF TEST
~CASING TEST
3
2
Barrels
o
3000 -
2500 - /
./.It
2000 - ..If
w k
a::
::> Jr
~ 1500- 4"
w
a::
a.. ~
1000 - f
¡..
1.5 bbls
1...1
PIT 15 Second
Shut-in Pressure, psi
395
1...1
EMW = Leak-off Pressure + Mud Weight = Go to PIT Plot. 8 8
0.052 x TVD 0.052 x 2613 + .
EMW at 4527 Ft-MD (2613 Ft-TVD) = ,13.96 ppg
Pressure InteQritvTest
Mud Weight:- 8.8 ppg
Mud 10 min eel: 10.0 Lb/100 Ft2
Rotating Weight: 8:5:000 Lbs
BlockslTop Drive Weight: 29,000 Lbs
Desired PIT EMW: ·H3.0 ppg
Estimates for Test: 1250 psi
...
Drilling Supervisor: I
Type of Test: I Casing Shoe Test LOT/AT
Hole Size: 8-1/2" I...
RKB-CHF: 2H.31Ft
CasinQ Size and Description:
CasinQ Test
Mud Weight: 9.6 ppg
Mud 10 min Gel: 42.0 Lb/100 Ft2
Test Pressure: 2,:500 psi
Rotating Weight: 85,000 Lbs
BlockslTop Drive Weight: 29,000 Lbs
Estimates for Test: 3 bbls
Hole Depth
4,537IFt-MD I 2.617 Ft-TVD
"'1
Casing Shoe Depth
4;527 I Ft-MDI 2t6~3IFt-TVD
19-5/8" 4O#/R L-80 BTC
PRESSURE INTEGRITY TEST
CONOCOPHILLIPS Alaska, Inc.
ïE" I D t 1 ~ ',...·/)(,...·nL,..,~
I -.;:( a e: ":)J.;:;.¿",!¿t.: ;...,
I Pump used: I #2 Mud Pump I.....
Pumping down annulus and DP. ...
Ri9:
BurleyìHm
3S~24
Well Name:
Volume
Bled Back
IBbls
''';';';''';';\J~ì ~.;~;~""""..;...,
Pumped
1.1 Bbls
Pressure Integrity Test
Pumping Shut-in
Strks psi Min psi
0 5ï 0 420
2 145 025 395
4 :235 05 390
6 323 1 . 3&?
I
8 400 1 5
10 433 2 ~(5
12 432 25 3ì5
14 3 3ìO
16 35 3iO
18 4 365
20 45 365
.
22 5 360
24 55 360
26 6 360
. 360
65
ï 360
75 355
8 355
85 355
9 355
95 3..5.D
10
~
Pump Rate:
6.0 Strk/min
............. 1"'............. ~
..............~.............
............... ..............
.............. ..............
............... ..............
.............................
............... ..............
.............................
:¡¡¡¡¡¡j¡¡¡¡¡¡¡¡¡¡¡¡¡!¡¡¡¡~¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡j¡¡¡¡¡¡
'....\/öïüïTIE;.... Volume
Pumped ~.:.:.~:~:;:~:. Back
3 1 Bbls ····....·..··..1 Bbls
. ............................
30
40 5 10 "15 20 25
Shut-In time, Minutes
o PIT Point
3
Comments:
-ø-CASING TEST
2
Barrels
500-~. .~~
¿'A'
o@ .4C
o
~ LEAK-OFF TEST
"=n
¡.. . ~. tI}~tt:}n:ttIttt:[
..............11'..............
............... ..............
.............................
............... ..............
.............................
............... ..............
.............................
............... ..............
:¡~¡~~~¡~~~~~~~¡~~~¡~~~~~~~~~~~~fff~~f~~~~~~
: ¡~~~~~~~~~~~~~~~~~¡~~~~~~~fi~~iii~i~~~~~
...............:'.............,..........................
............... ..............
............... ..............
.............................
............... ..............
.............................
............... ..............
.............................
............... ..............
..............~.............
................ ...............
...-.-....................
.................
.................
................,
Strokes ~ JI~II~II! Bbls/Strk 'Y
Casing Test
Pumping Shut-in
Strks psi Min psi
o 0 0 2500
5 ~60 1 2498
10 330 2 2495
15 500 3 2495
20 670 4 2490
25 835 5 2490
30 1000 6 2490
35 1165 ì'2490
40 1330 8 2490
45 1506 9 '~490
50 1670 10 2490
.. 1
55 1830 15 2490
60 2000 20 2485
65 2180 25 24~5
70 2330 30 24851
::~{{mtr$.:AI!a.øø.l
Volume/Stroke
1 Volume '"put
dCJ~ -CJl'\
~
A
- Lo::.t 15 p::.r during test. held 99 4'), of -
= test pressure. -
'~~'*:i.::~l;¡æk~~LL..c:.
.A
1000 - A'
~1r
w
a:::
=:J
en 1500-
en
W
a:::
D..
JI
A'
2000 -
2500 -
3000 .
1.5 bbls
1·1
PIT 15 Second
Shut-in Pressure. psi
395
1·1
EMW = Leak-off Pressure + Mud Weight = Go to PIT Plot. 8 8
0.052 x TVD 0.052 x 2613 + .
EMW at 4527 Ft-MD (2613 Ft-TVD) = 11.96 ppg
Pressure Inte"ritvTest
Mud Weight ..: ..' ppg
Mud 10 I11In Gel 1i.' r.' Lb/100 Ft2
Rotating Weight· '''.:: .:'1(::) Lbs
BlocksfTop Dri\'e Weight .:.~', :>JI Lbs
Desired PIT EMW 1"', i.· ppg
Estimates for Test: 1250 psi
Drilling Supervisor: I
Type of Test: I Casing Shoe Test LOT/AT
Hole Size: 8-1/2" I.
RKB-CHF: 2331Ft
CasinQ Size and Description:
CasinQ Test
Mud Weight: 96 ppg
Mud 10 min Gel: 42.0 Lb/100 Ft2
Test Pressure: 2~~OD psi
Rotating Weight: 85,000 Lbs
BlockslT op Drive Weight: 29, DOG Lbs
Estimates for Test: 3 bbls
Hole Depth
4,5371Ft':'MD I 2:6'!71 Ft-TVD
1·/
Casing Shoe Depth
4.527 1Ft-MOl 2,6131 Ft-TVD
19-5/8" 4O#/Ft L-80 BTC
...
Pumping down annulus and DP.
...
PRESSURE INTEGRITY TEST
CONOCOPHILLIPS Alaska, Inc.
'7¡::~ Date' I r.;jL.....r-JJ')(v':·~
, (,..,..,.......1 . VI .;;...t~..,t..J'",,'
I Pump used: 1 #2 Mud Pump I...
Ri9:
Bur¡eyfHm
3S~2~
Well Name:
Conoc~hillips
Post Office Box 100360
Anchorage, Alaska 99510-0360
Randy Thomas
Phone (907) 265-6830
Fax: (907) 265-1535
Email: randy.l.thomas@conocophillips.com
RECEIVED
APR 1 2 2004
k 0·, & Gas Cons Comnl\ssion
A'as a I .
Anchorage
April 12, 2004
Alaska Oil and Gas Conservation Commission
333 West ih Avenue
Suite 100
Anchorage, Alaska 99501
(907) 279-1433
Re: Application for Sundry Plug & Abandon Original Wellbore, Producer 38-24
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Plug & Abandon the original wellbore for the 38-24
well, an onshore Producer well, and then sidetrack KRU 3S-24A, a development well.
Note: it is planned to abandon the original wellbore then set a CIPB at 10548' MD and place a permanent
whipstock on top of the CIBP at 10547' MD. We will then cut and mill a window in the existing 7" production
casing after squeezing cement into the 7" x 8-1/2" annulus at the whipstock depth.
This well is to be completed as a 3-1/2" mono-bore producer. The liner portion of the mono-bore will be
cemented top-to-bottom using a liner hanger.
Please find attached for the review of the Commission the information required by 20 ACe 25.005 (c). The
spud date is expected to be approximately 05/01/04.
If you have any questions or require any further information, please contact Kelly McLure at 265-6059.
Sincerely,
/' ~
¡ /
Kelly 1\. tnc. u..rc:..
GKA Drilling Engineer
~\~
OR~G\Nl\L
1. Type of Request:
Abandon
V
RECEIVE~/\)
ALASKA OIL AND GAS CONSERVATION COMMISSION 2 004~' ¿:>..~
APPLICATION FOR SUNDRY APPROVAL APR 1 2 ~~
20 AAC 25.280 Ala~ka nil & r,:¡s r.ons. r.ommission X
o Suspend D Operational shutdown D Perforate D Variance Anch~ge Annular Dispos.D
D Repair well D Plug Perforations D Stimulate D Time Extension D Other D
D Pull Tubing D Perforate New Pool D Re-enter Suspended Well 0
4. Current Well Class: 5. Permit to Drill Numberv
Development 0 Exploratory D 203-079
Stratigraphic D Service D 6. API Number: ~
50-103-20456-00
STATE OF ALASKA
~,
Alter casing
Change approved program
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska
7. KB Elevation (ft):
24' RKB
9. Well Name and Number:
3S-24
8. Property Designation:
ADL 380107 & 255511 ALK 2616 & 2639
10. Field/Pools(s):
Kuparuk River Field
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured) Junk (measured):
13656' 6068' 13550' 6028'
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 841 16" 108' 1081
Surface 45031 9.625" 45271 26131
Intermediate
Production 11231' 7" 112551 51391
Liner 25341 3.5" 136501 6066'
Perforation Depth MD (ft):
132941-133701
Packers and SSSV Type:
Baker ZXP pkr, Landing Nipple
12. Attachments: Description Summary of Proposal 0
Detailed Operations Program 0 BOP Sketch D
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Perforation Depth TVD (ft):
59291-59591
Packers and SSSV MD (ft):
packer @ 11116', nipple @ 521'
13. Well Class after proposed work:
Exploratory D Development 0
15. Well Status after proposed work:
Oil D Gas D
WAG D GINJ D
Tubing Size:
3.5"
Tubing Grade:
L-80
Tubing MD (ft):
111551
Service D
Date:
Plugged D
WINJ D
Abandoned 0
WDSPL D
5/1/2004
Contact
~1f'JrfÄ.~ft~Ýl~~~ '1-/2-0 y
Date i..( / ( -:::'/0 Y
Printed Name
R. Thomas
K~\~
Title
Kuparuk Drilling Team Leader
265-6830
Signature
Phone
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness
Plug Integrit~ BOP Test '§Zl Mechanical Integrity Test D Location Clearance D
~~?Ù q '? c; \ '"" \. ~ \. ~\.A... ù \I~ \;.0 \> -\-c..~ --\ \ _. \
Other: ~ \.C "Z:t'-.: C~~, \,<~ö..,ð\~~ \,\\.J"'~R~\~ "-'::.~
\-\'0\ U\,~\\(ö.\\ö'" ,~~\ \((J ç\:)\ ~~-ð-'-\ ~
Subse uent Form R quire' \ \) ~\
Sundry Number:
3ot-llf
COMMISSIONER
BY ORDER OF
THE COMMISSION
Date: IfJ~~
APR 1 3 2to~
Form 1 0-403 Revised 2/2003
18)MSBFl
ORIGINAL
SUBMIT IN DUPLICATE
~
3S-24A Drilling ProQram
Pre-Rig Well Work:
1. Notify the AOGCC field inspector 24 hours prior to commencing pre-rig work.
2. Set Cement retainer at 13200' md with the top perforations at 13294'. (PT to ensure it is set correctly)
3. Rig CTU: Sting into retainer and sqz off perfs. pull above and lay in 50' of cement above plug.
4. Tag cement plug, pull OV, load IA and tubing with seawater.
5. CMIT against cement plug. (AOGCC present as witness)
6. Freeze protect well with diesel.
7. Set BPV and VR plug.
Rig Work:
1. Notify the AOGCC field inspector 24 hours before spud and BOP test. MI/RU Doyon 141. Install a TWC.
NO the upper tree assembly. NU and test the 13-5/8" BOPE to 250# 1 3500# (note: a 7-1/16" x 13-5/8"
DSA or spool is required). Retrieve the TWC. (11 "x 5M- it is Gen 5 wellhead)
2. Pull VR plug & BPV.
3. Screw into the 3-112" tubing with the landing joint. UD the tubing hanger. Screw in to the tubing and
circulate the well clean with seawater. UD the tubing and GLM's.
4. R/U E-Line. Run a CCU 6-1/8" Gage Ring to ± 10600' MD'.
5. Set 7" CIBP at 10548' MD (Note: CIBP must be ;?:: 2.0' above a casing collar and;?:: 20' below a casing
collar- actual depth is adjustable). POOH, RD E-line.
6. PU and RIH with Baker's "WindowMaste;' whipstock system, bottom trip anchor, MWD, and UBHO on
drill pipe from the derrick. Orient and set the whipstock using the MWD with the bottom of the whipstock
,(..,¡ ""- set at 1 0548' MD (basically on top of CIBP)
K'- ,:)(.).-
"AQÆ> 7. Shear off the whipstock. Displace the 7" casing and the pits with LSND mud. Mill the window in the 7",
o-"li~.. ' 26#, L-80 casing, and continue milling until the upper watermelon mill is outside the casing: 2: 29'. After
,-. reaming through the window to eliminate burrs and other irregularities. Minimum acceptable EMW = 13.0
ppg. POOH.
,~~
,;ð
'}¡'7 ~
;,~
,~
'-\J\
8. P/U a 6-1/8" PDC bit, PDM, MWD, LWD, non-mag flex collars and jars as required. RIH with the HWDP
from the derrick, and then P/U an additional 30 stands of 4.0" DP. Finish RIH with DP from the derrick.
Carefully wash the last 15'-20' to bottom.
Drill ahead using directional program as per Baker-Inteq. The sidetrack depth is in the C-40 and no thief
zones are expected near this depth. Maintain the LSND mud properties as per the MI program. Watch
the ECD and limit ROP as necessary to maintain ECD ~ 13.5 ppg. The MW should be 2: 10.5 ppg at the
T/HRZ: 5500' TVD. The MW should be ± 10.9 ppg before drilling into the T/Kuparuk: 5870' MD.
10. Control drill as needed through the Kuparuk as needed for good quality LWD logs. Continue drilling into
the Miluveach Shale to give ± 200' of rat hole below the base of the Kuparuk C. The proposed TD is ±
12483' MD, 6022' TVD. At TD, circulate bottoms and make a wiper trip up near the window. RIH to TO.
Circulate and condition the hole to run the liner. POOH.
11. R/U and run the 3-1/2" liner to TD. The required overlap is 2: 150': TOL = 10,380' MD. Rotate and
reciprocate the liner while circulating and cementing. R/U Dowell and prepare to cement the liner.
12. Pump 10 bbl of CW1 00. Test Lines to 4000 psi. Rotate & reciprocate the liner throughout the job. Pump
15 bbl of Mud Push Spacer. Mix and pump 416.1 sx of Class G (87 bbl). Drop the DP dart and displace
¡I'
(
("
with 120 bbl of mud. Slow the pump rate to S 3 bpm after pumping ± 22 bbl of seawater. Watch for the
liner wiper plug to shear. Stop reciprocating the liner and finish displacement. Rotate the liner as long as
possible. Slow the pump rate for the last 3 bbl and bump the plug with 1000 psi over final displacement
pressure. Check the floats. Pressure up to ± 2500 psi and set the liner hanger. Pressure up to 3500 psi
to release the HR setting tool and set the ZXP using slack off weight: ~ 25,000#. Pressure up to ± 500
psi and slowly pull up out of the Liner hanger. When the pressure bleeds off to the annulus, immediately
circulate bottoms up (± 90 bbl) at high rate. Note any cement andlor spacer returns. SID and test the
ZXP to 1000 psi. RID Dowell.
13. Displace the well above the TOL with seawater (± 115 bbl) and until the returns are clean. Check for
flow. POOH. LD/DP. RIH with the DP from the derrick and then LD/DP.
14. R/U and run the 3-1/2" tubing with the PBR seal nipple. RIH and tag the TOL. Space out the tubing string
with pup joints such that there remains 1 '-2' of free travel in the seal assembly. Install the tubing hanger
and landing joint. Displace the well above the TOL with clean seawater. Sting into the PBR and land the
tubing hanger. RILDs. Test tubing, PBR and liner to 3500 psi with the IA open. Bleed the tubing down to
2000 psi. Test the lA, PBR and TOL to 3500 psi. Bleed off all pressures.
15. Install a TWC. ND BOPE. NU and test the 4-1/16" (5M) tree to 5000 psi with the IA open. Pull the TWC.
Pressure up the IA to ± 2500 psi and shear the "RP" valve. Displace the well with diesel freeze protect
fluid through the "RP" valve (114 bbl). Install a BPV. RID and M/O Doyon 141.
Post-Rig Well Work:
1. Change out shear valve
2. Coil tubing mud clean out
3. Run Cement Bond Log
4. Perforate
5. Obtain Initial Pressure measurement
6. Change out dummy valves to GL V x 5
KRU - 38-24 Pro\. .Jcer
Completion Schematic T opset
P&A Schematic
16"x30"
insulated
conductor @
+1- 108' MD
l ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
J1 ~
.... ~
~
~
~
~
'-
~
~
~
~
~
~
~
'-
~
~
~
~
~
'-
'-
~
~
'-
~
~
"'"
Surface csg.
9-5/8"40# L-80
BTC (4527' MD I
2613'1VD)
Intermediate csg.
7" 26.0# L-80 BTCM
(11255' MD I 5139'1VD)
P&A Procedure
Place 50' cement on top of retainer
Set cement Retainer at 13200' MD
Squeeze cement below retainer &
across perforations
C Sand Perfs
Production Liner
3-1/2" 9.3# L-80 SLHT
(13650' MD 16066' 1VD)
r
~
~
~
~
~
'-
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
-
...
..
, "(-
~ r r
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~ ~
~L....
~ -
~
~
~
~
~
~
I
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
j
WI
+-
~
1\ 'Y
Co no co Phil lips
3-1/2" FMC Gen V Tubing Hanger, 3-1/2" L-80 EUE8RD pin down Special Drift 2.91"
3-1/2" 9.3# L-80 EUE8RD Space out Pups as Required Special Drift 2.91"
3-1/2" 9.3# L-80 EUE8RD Tubing to Surface Special Drift 2.91"
3-1/2" Camco DS Landing Nipple with 2.875" 10 No-Go profile set @ +1- 500' MD.
Gas Lift MandrelsNalves
St MD 1VD Man Type V Mfr V Type V OD Latch Port TRO
1 4241 2505 CAMCO KBUG DMY 1.0 BK 0.000 0
Date Run
7/29/2003 (1)
1111/2003
11/1/2003
11/23/2003
2 7804 3852 CAMCO KBUG DMY 1.0 BK 0.000 0
39912 4630 CAMCO KBUG DMY 1.0 BK 0.000 0
411019 5051 CAMCO KBUG OV 1.0 BK 0.313 0
JEWELRY
Depth 1VD Type Description ID
521 519 NIP CAMCO 'DS' LANDING NIPPLE WINO GO PROFILE 2.875
11071 5071 SLEEVE-O BAKER CMU SLIDING SLEEVE WICAMCO 2.812" DS PROFILE 2.812
11117 5088 SEAL BAKER G-22 LOCATOR SUB/SEAL ASSEMBLY GBH-22 3.000
11154 5102 TTL 2.992
LINER JEWELRY
Depth 1VD
111045084
111165088
111265092
111355095
111545102
131965890
13648 6065
Type Description ID
TIE BACK TIE BACK SLEEVE 5.250
PACKER BAKER ZXP LINER TOP ISOLATION PACKER W/HR PROFILE 5.000
HANGER BAKER FLEX LOCK HANGER 4.410
SBE BAKER 20' SEAL BORE EXTENSION 4.000
XO 3.500
Marker Joint 2.992
SHOE 'V' SET FLOAT SHOE 2.992
3-1/2" X 1-1/2" 'MMG' GLM wI DCR Dump Kill Valve (3000 psi casing to tubing shear). 6'
L-80 handling pups installed on top and bottom of mandrel.
1 jt 3-1/2" 9.3# L-80 EUE8RD tubing
3-1/2" Camco "DS' nipple wI 2.813" No-Go profile
1 jt 3-1/2" 9.3# L-80 EUE8RD tubing
5.125" x 3" Baker locator sub
4-1/2" Baker GBH-22 casing seal assembly wI 12' stroke, 3-1/2" L-80
EUE8RD box up
Liner Assembly (run on drillpipe). 150' of liner overlap
Baker 7" x 5" 'ZXP' Liner Top Isolation Packer with HR profile
Baker 7" x 5" 'Flexlock' Liner Hanger
Baker 20' Seal Bore Extension
XO Sub, 5" Stub Acme box x 3-1/2" SLHT pin
3-1/2" 9.3# L-80 SLHT liner as needed
3-1/2" Baker Landing Collar
2 jts 3-1/2" 9.3# L-80 SLHT tubing
3-1/2" Baker Float Collar
1 jt 3-1/2" 9.3# L-80 SLHT tubing
3-1/2" Baker Float Shoe
Scott Lowry 03/31/03
It
Mike Mooney
Wells Group Team Leader
Drilling & Wells
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-263-4574
Conoc~hillips
November 18, 2003
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Report of Sundry Well Operations for 38-24 (APD # 203-079)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Report of Sundry Well Operations
for the recent workover operations on the Kuparuk well 3S-24.
If you have any questions regarding this matter, please contact me at 263-4574.
Sincerely,
M.M~
M. Moon~
Wells Group Team Leader
CPAI Drilling and Wells
MM/skad
RECEIVED
DEC - 4 2003
Alaska Oil & Gas Cons. Comnission
Anchorage
ORIGINAL
Alter Casing
Change Approved Program
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
P. O. Box 100360, Anchorage, Alaska
7. KB Elevation (ft):
RKB 24', 56' AMSL
8. Property Designation:
ADL 380107 & 25551, ALK 2616 & 2639
11. Present Well Condition Summary:
1. Operations Performed:
Total Depth
Effective Depth
Casing
Structural
CONDUCTOR
SURFACE
PRODUCTION
LINER
Perforation depth:
(
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Abandon
REPORT OF SUNDRY WELL OPERATIONS
o Suspend 0 Operation Shutdown 0
o Repair Well 0 Plug Perforations 0
o Pull Tubing 0 Perforate New Pool 0
Other 0
Perforate 0
Stimulate 0
Variance
o Annular Disp. 0
o
o
Time Extension
4. Current Well Status:
Development 0
Stratigraphic 0
Re-enter Suspended Well
5. Permit to Drill Number:
203-079 I
6. API Number:
50-1 03-20456-00
Exploratory 0
Service 0
9. Well Name and Number:
3S-24
10. Field/Pool(s):
Kuparuk River Field I Kuparuk Oil Pool
measured 136561 feet
true vertical 6068' feet
measured 13521' feet
true vertical 6016' feet
Length Size MD
80' 16" 108'
4499' 9-5/8" 4527'
11229' 7" 11255'
2546' 3-1/2" 13650'
Plugs (measured)
Junk (measured)
TVD
Burst
Collapse
108'
2613'
5139'
6066'
Measured depth: 13294'-13370'
RECEIVED
DEC - 4 2003
AIa.ka Oil & Gas Cons. Commission
Anchorage
true vertical depth: 5929'-5959'
Tubing (size, grade, and measured depth) 3-1/2" , L-80, 11154' MD.
Packers & SSSV (type & measured depth) Baker ZXP liner top isolation packer pkr @ 11116'
SSSV= NIP SSSV= 521'
12. Stimulation or cement squeeze summary:
Intervals treated (measured)
13294' - 13370'
90M# 16/20 CL in formation
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Met Water-Bbl Casinq Pressure Tubinq Pressure
Prior to well operation 288 621 9 206
Subsequent to operation 264 214 281 215
14. Attachments 15. Well Class after proposed work:
Copies of Logs and Surveys run _ Exploratory 0 Development 0 Service 0
Daily Report of Well Operations _X 16. Well Status after proposed work:
oil0 GasD WAGD GINJD WINJ 0 WDSPLD
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt:
Contact
Printed Name
Signature
Mike Mooney @ 263-4574
Mi~MOOney
1 Nr1
Title
Phone
Wells Group Team Leader
Date '2/~/()f
Prepared bv SHaron AII$uo-Drake 263-4612
RBDMS Bfl D~C 4 ~03
SUBMIT ~ DUPLlCATÉ
Form 10-404 Revised 2/2003 ·
OR\G\NAL
Date
10/19/03
11/01/03
11/02/03
11/03/03
11/04/03
~
('
35-24 Event History
Comment
RE-PERFORATED 13296' -133111,6 SPF POWER FLOW, 60 DEG PHASING. [PERF]
SET DV1S @ 99121,78041 RKS, SET SV @ 11071' RKS, DISPL CSG W/ 241 BBL SW, 53 SBL DSL, DISPL
TBG 17 BBL DSL, 79 BSL SW. FREEZE PROTECT FLOW LINE W/ 20 BBL METHANOL, IN PROGRESS
[FRAC-REFRAC]
SET DV @ 11019' RKS. TESTED TSG 2500 PSI, GOOD; TESTED CSG 3000 PSI, GOOD. PULLED SV.
[FRAC-REFRAC]
PUMPED INITIAL FRACTURE TREATMENT. PLACED 90M# 16/20 CL IN FORMATION, 8 PPA ON PERFS,
101 % OF DESIGN. FLUSHED TO COMPLETION. [FRAC-REFRAC]
CLEANED FILL TO PSTD AT 13,521' CTM W/ SEAWATER J-313 & 1-1/2# BIOZAN USING A 2" JET-SWIRL
NOZZLE. WELL FP'D W/ DIESEL TO 2500'. [FCO]
Page 1 of 1
11/1712003
NIP (521-522,
00:4.520)
TUBING
(24-11154,
00:3.500,
10:2.992)
PACKER
(11116-11117,
00:7.000)
Perf
(13294-13302)
Perf
(13296-13311)
Perf
(13302-13332)
Perf
(13332-13362)
LINER
(11104-13650,
00:3.500,
Wt:9.30)
ConocoPhiUips Alaska, Inc.
~
U
'-,1
"
;
~
~
~
~,
~
...
Casing String - ALL STRINGS
Description Size
PRODUCTION 7.000
SURFACE 9.625
CONDUCTOR 16.000
Casing String - LINER
Description
LINER
Tubing String - TUBING
Size I Top
3.500 24
Pefforations··Summary
Interval TVD
13294 -13296 5929 - 5930
3S-24
API: 501032045600
SSSV Type: NIPPLE
Annular Fluid:
Reference Log: 24.3' RKB
LastTag: 13516
Last Tag Date: 10/1/2003
~í
KRU
35-24
Well Type: PROD
Orig 6/12/2003
Completion:
Last W/O:
Ref Log Date:
TD: 13656 ftKB
Max Hole Angle: 70 deg @ 3853
Angle ~ TS: 67 deg ~ 13296
Angle @ TD: 67 deg @ 13656
Rev Reason: PERFS
Last Update: 10/26/2003
Top
26
28
28
Bottom TVD Wt Grade Thread
11255 5139 26.00 L-80 BTCM
4527 2613 40.00 L-80 BTCM
108 108 62.50 H-40 WELDED
Bottom TVD Wt l Grade I Thread
13650 6066 9.30 EUE8RD
Wt Grade Thread
9.30 L-80 EUE8RD
Size
3.500
Top
11104
Bottom
11154
TVD
5102
Zone
C-4
Status
Ft SPF Date Type Comment
2 6 6/22/2003 IPERF 2.5" HSD PJ, 60 deg phase
- 4 runs
15 12 10/19/2003 RPERF 2.5" HSD Powerflow, 60
deg phase
59 6 6/22/2003 IPERF 2.5" HSD PJ, 60 deg phase
- 4 runs
13296 - 13311 5930 - 5936 C-4
13311 - 13370 5936 - 5959 C-4
St MD TVD Man
Mfr
1 4241 2505 CAMCO
2 7804 3852 CAMCO
3 9912 4630 CAMCO
4 11019 5051 CAMCO
1. BENT LA TCH
Other l:Jlugs, equip., etc.' - JEWELRY
Depth TVD Type Description
521 519 NIP CAMCO 'DS' LANDING NIPPLE WINO GO PROFILE
11071 5071 SLEEVE-O BAKER CMU SLIDING SLEEVE W/CAMCO 2.812" DS PROFILE
11117 5088 SEAL BAKER G-22 LOCATOR SUB/SEAL ASSEMBLY GBH-22
11154 5102 TTL
Other t:Jlugs, equip., etc.: - LINER JEWELRY
Depth TVD Type
11104 5084 TIE BACK
11116 5088 PACKER
11126 5092 HANGER
11135 5095 SBE
11154 5102 XO
13196 5890 Marker
Joint
SHOE 'V' SET FLOAT SHOE
Man
Type
KBUG
KBUG
KBUG
KBUG
V Mfr
V Type V OD Latch
TRO
Port
Date
Run
7/29/2003
9/13/2003
9/13/2003
9/13/2003
Vlv
Cmnt
(1)
DMY
GLV
GLV
OV
1.0
1.0
1.0
1.0
BK
BK
BK
BK
0.000 0
0.188 1341
0.250 1433
0.313 0
ID
2.875
2.812
3.000
2.992
Description
ID
5.250
5.000
4.410
4.000
3.500
2.992
TIE BACK SLEEVE
BAKER ZXP LINER TOP ISOLATION PACKER W/HR PROFILE
BAKER FLEX LOCK HANGER
BAKER 20' SEAL BORE EXTENSION
13648 6065
General Notes
Date Note
6/11/2003 TREE: GMC / GEN 5/5M
TREE CONNECTION: TOP 5.75" ACME with 3.5" EUE8RD THREAD
8/1/2003 LOST 2.57" X .250" Ell ROLLER WHEEL IN HOLE
2.992
SchlulDbepgel'
NO. 2967
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic B'vd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
09/25/03
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well
Field:
Date BL Color
09/01/03 1
09/02103 1
09/05/03 1
08/01/03 1
08/02103 1
08/06/03 1
08/07/03 1
08/20/03 1
08/23/03 1
08/14/03 1
Job#
Log Description
2X-14 15S4 - i '~ PROD PROFILE/DEFT
2A-24 1 q, ~ -', r. PROD PROFILE
3F-15 t3J=)-óL· INJECTION PROFILE
35-24 æ~ -(2 INJECTION PROFILE
35-09 Âr~-',?k-t? INJECTION PROFILE
3H-07 l ~ j-0"1 --¡ INJECTION PROFILE
2K-11 ~( P 'c<i ~ S8HP SURVEY
1D-103 ,"'"' Q9. 't"qiC INJECTION PROFILE
1c-174 _<i ;3 Lfi)-t INJECTION PROFILE
18-102 ;9{)~~ 23432 USIT
~ .. ""'--.....
SIGNED: ~~\ ~"'<, -\ '\ '. 0 ~,~~ ~ ~
DATE:
Kuparuk
CD
, ~
F~, i(: ';~;t~"a \/ t: U
~~ ç :) ? ~l ~: :J (: ;:¡
, . " . ': i_~:';·.:·;.·;'" ~/;n;¡;¡:s~Ci1
.~~~J3t~:j '-.,;;\ -,:i. . -
Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. :~j¡cnür?iç;:;
~~~ ._ _ C"
I{
ii,
Randy Thomas
Kuparuk Drilling T earn Leader
Drilling & Wells
Conoc~hillips
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6830
August25,2003
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Subject: Well Completion Report for 3S-24 (APD # 203-079)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent drilling operations of the Kuparuk well 3S-24.
If you have any questions regarding this matter, please contact me at 265-6830 or
Scott Lowry at 265-6869.
Sincerely,
..-;...~.,~~
TL..____ , --#'
R. Thomas
Kuparuk Drilling Team Leader
CPAI Drilling
RT/skad
ORIGIN A:
( STATE OF ALASKA i~
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: Oil 0
Gas U
Plugged U Abandoned U
20AAC 25.105
No. of Completions _
GINJ D
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
WINJ D
WDSPl D
P. O. Box 100360, Anchorage, AK 99510-0360
4a. location of Well (Governmental Section):
Surlace: 25651FNL, 1266'FEL,Sec. 18,T12N,R8E,UM
At Top Productive
Horizon: 730' FNL, 1567' FWL, Sec. 25, T12N, R7E, UM
Total Depth:
999' FNL, 3911' FEL, Sec. 25, T12N, R7E, UM
4b. location of Well (State Base Plane Coordinates):
Surlace: x- 475994 ' y-
TPI: x- 468709 y-
Total Depth: x- 468510 · y-
18. Directional Survey: Yes 0 NoU
5993852
5985154
5984887 .
Zone-4
Zone-4
Zone-4
21. logs Run:
GR/Res, SCMT
22.
Suspended U WAG D 1b. Well Class:
20AAC 25.110 Development 0 Exploratory D
Other _ Service D Stratigraphic Test D
5. Date Comp., Susp., ,,1 }! 12. Permit to Drill Number:
or Aband.: June~ 2003 203-079/
6. Date Spudded: 13. API Number:
May 18, 2003 . 50-103-20456-00
7. Date TD Reached: 14. Well Name and Number:
June 1,2003
8. KB Elevation (ft):
,
24' RKB / 56' AMSL·
9. Plug Back Depth (MD + TVD):
13550' MD 16028' TVD
10. Total Depth (MD + TVD):
13656' MD 16068' TVD
3S-24
15. Field/Pool(s):
Kuparuk River Field
Kuparuk River Oil Pool
16. Property Designation:
ADL 380107 & 25551
11. Depth where SSSV set:
Land Nipple @ 521'
19. Water Depth, if Offshore:
N/A feet MSL
17. land Use Permit:
ALK 2616 & 2639
20. Thickness of
Permafrost:
1740' MD
CASING SIZE WT. PER FT.
16" 62.5#
9.625" 40#
7" 26#
3.5" 9.3#
GRADE
B
L-80
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
TOP BOTTOM
Surlace 108'
Surlace 4527'
Surlace 11255'
11116' 13650'
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Well shut-in
GAS-MCF
23. Perforations open to Production (MD + TVD of Top and Bottom
Interval, Size and Number; if none, state "none"):
13332' - 13362' MD
13302' - 13332' MD
132941 - 133021 MD
13362' - 13370' MD
6 spf
6 spf
6spf
6spf
5944' - 5955' TVD
59321 - 5944' TVD
59291 - 5932' TVD
5955' - 5959' TVD
26.
Date First Production
June 27, 2003
Date of Test Hours Tested
n/a n/a
Flow Tubing Casing Pressure
press. psi
27.
Production for
Test Period -->
Calculated
24-Hour Rate ->
Oll-BBl
Oll-BBl
HOLE SIZE
AMOUNT PUllED
CEMENTING RECORD
42"
81 sx ArcticCrete
12.25"
525 sx AS III Lite, 415 sx LiteCrete
184 sx LiteCrete
8.5"
6.125"
950 sx Class G
24.
TUBING RECORD
DEPTH SET (MD)
11155'
PACKER SET (MD)
11116'
SIZE
3.5"
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
4527' - 4557' 200 sx Class G
W A TER-BBl
CHOKE SIZE
GAS-Oil RATIO
GAS-MCF
W A TER-BBl
Oil GRAVITY - API (corr)
CORE DATA
Submit core chips; if none, state "none".
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
r·ë;:~ '~;':::~,~~: i~6i\j-""r
1 k L;-.:t ¡
¡ - -!...ZL··Cd
f Vi::FìH-:'¡ ~) f
I
~"'~'~~:---~". -.~.- ~
NONE ·
Form 10-407 Revised 2/2003
CONT'Ö~Nf~T~r~ L
RBIDMS [3ft t9 ft AUG 2 R ?nn1
Submit in duplicate
28.
(
GEOLOGIC MARKERS
29.
:(
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List inteNals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None",
3S-24
Top C Sand
Top A Sand
13295.5'
13363'
5930'
5956'
NIA
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed NarpQ '-....a.~Dtpaf..
Signature . \ l \ ~
Title:
i'~ ,1.;1e
Kuparuk Drillina Team Leader
Contact: ./ /" Scott Lowry @ 265-6869
~c..--
~ (2.r lð3
Date
Prepared by Sharon Allsup-Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 1 0-407 Revised 2/2003
OR\G\NAL
Page 1 of 11
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: 3S-24
Common Well Name: 3S-24
Event Name: ROT - DRILLING
Contractor Name: N1268@ppco.com
Rig Name: Nabors 7ES
Date From - To Hours Code Sub Phase
Code
5/18/2003 05:30 - 16:00 10.50 MOVE MOVE MOVE
16:00 - 18:00 2.00 DRILL RIRD RIGUP
18:00 - 18:30 0.50 DRILL RIRD RIGUP
18:30 - 19:00 0.50 DRILL PULD SURFAC
19:00 - 20:15 1,25 DRILL PULD SURFAC
20:15 - 22:00 1.75 DRILL PULD SURFAC
22:00 - 22:30 0.50 DRILL RIRD SURFAC
22:30 - 23:45 1.25 DRILL PULD SURFAC
23:45 - 00:00 0,25 DRILL DRLG SURFAC
5/19/2003 00:00 - 01 :00 1,00 DRILL DRLG SURFAC
01 :00 - 02:00 1.00 DRILL SURV SURFAC
02:00 - 12:00 10,00 DRILL DRLG SURFAC
12:00 - 12:30 0,50 DRILL DRLG SURFAC
12:30 - 13:30 1.00 DRILL SURV SURFAC
13:30 - 00:00 10.50 DRILL DRLG SURFAC
5/20/2003 00:00 - 18:15 18.25 DRILL DRLG SURFAC
18:15-20:30 2.25 DRILL CIRC SURFAC
20:30 - 23:45 3.25 DRILL TRIP SURFAC
23:45 - 00:00 0.25 DRILL REAM SURFAC
5/21/2003 00:00 - 00:30 0.50 DRILL REAM SURFAC
00:30 - 02:30 2.00 DRILL TRIP SURFAC
02:30 - 04:00 1.50 DRI LL PULD SURFAC
04:00 - 06:30 2.50 CASE RURD SURFAC
06:30 - 07:00 0.50 CASE SFTY SURFAC
07:00 - 10:15 3.25 CASE RUNC SURFAC
1 0: 15 - 11 :30 1.25 CASE RUNC SURFAC
11 :30 - 12:00 0.50 CASE OTHR SURFAC
12:00 - 12:45 0.75 CASE RUNC SURFAC
12:45 - 13:45 1.00 CASE RUNC SURFAC
13:45 - 14:15 0.50 CASE RUNC SURFAC
14:15 - 16:45 2.50 CASE RUNC SURFAC
16:45 - 17:30 0.75 CEMENT PULD SURFAC
17:30 - 21 :00 3.50 CEMENT CI RC SURFAC
21 :00 - 00:00 3.00 CEMENT PUMP SURFAC
Start: 5/18/2003
Rig Release: 6/12/2003
Rig Number:
Spud Date: 5/18/2003
End: 6/12/2003
Group:
Description of Operations
Moved rig from 3S-06 to 3S-24.
Nippled up riser and flowline.
Accepted rig at 1600 hrs. 5/18/03
Connected blower hose to top drive.
Made up and stood back 3 DC's.
Loaded BHA in pipe shed.
Picked up bit and BHA and uploaded MWD.
Rigged up slickline.
Finished picking up BHA.
Spudded well and drilled from 108' to 120'. ART .25 Hr. TD RPM 45,
WOB 10 K, GPM 400, PP 785 PSI.
Drill f/120' to 182' ART =.50 AST = 0 hrs
WOB 10K, 400 GPM @ 785 psi
GYRO 3 times with Sperry-Sun, first 2 unsuccessful.
Directional Drill f/182' to 1093' (TVD 1045') ART =3.4 hrs, AST = 3.64
hrs. UP 75K, DN 75K, ROT 70K, TO 5K on- 2K off
Directional Drill f/1093' to 1180' ART = .25 hrs, AST = ,25 hrs. UP
75K, DN 75K, ROT 70K, TO 5K on, 2K off
Had trouble swithing modes on MWD, Trouble shoot same, Reboot
computers,
Directional Drill f/1180' to 2412' (TVD 1825') ART = 2.39 hrs, AST =
4.93 hrs. UP 93K, DN 50K, ROT 75K, TO 8K on, 6K off
Directional Drill f/2212' to 4537' (TVD 2591') ART = 10.03 hrs, AST =
1,89 hrs. UP 100K, DN 65K, ROT 80K, TO 11 K on, 7K off. WOB 40 -
45 K, TD RPM 90, GPM 550,
Pumped sweep and circulated hole clean.
POOH (Drag 5 - 20 K)SLM to 1440'.
Back reamed and reamed Dogleg from 1440' to 1375'.
POOH Backreamed dog leg @ 1375'.
Monitor well, static,POOH to BHA stood back HWDP and Flex DC's.
Laid down BHA, cleared tools from floor and clean up trip mess.
Change out bails, RU fill up tool, casing slips, elevators, tongs and
stabbing board.
Held prejob safety and opts meeting.
Mu shoe track and check floats,ok. Run 95/8" casing to 1500', set
down 15k.
Wash down from 1500' to 1700', 5.4 bpm / 320 psi - heavy sand/clay
returns. PUW 90K SOW 40K.
Check valve on fill up tool malfunctioned, would not open with 1800 psi.
Laid down fill up tool, disassembled check valve, no obvious problem.
Assembled check valve and MU fill up tool.
Continue to waS~down casing from 1700' to 1820', 5.3 bpm I 390 psi
SOW increased to 60K. Fill up tool check valve continued to
malfunction at rates below 5 bpm spiking open from 600 to 1200 psi.
Run casing to 2440'.
Wash down 2 joints to displace 300 vis mud from hole, 5.3 bpm 1360
psi - large amount of sand back across shakers, PUW 112K SOW 65K.
Run casing to 4496', Mu hanger and LJ, land casing with FS @ 4527',
FC @ 4449',
Laid down fill up tool and MU cement head.
Circulated and lowered YP. GPM 370 PP 600 PSI. Up Wt. 140 K Down
90 K. PJSM for cement job.
Pumped 5 Bbls CW100, Tested lines to 3000 PSI, Pumped 45 Bbls
Printed: 6/24/2003 4: 11 :54 PM
(
(
ConocoPhillips Alaska
Operations Summary Report
Page 2 of 11
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date From - To
38-24
38-24
ROT - DRILLING
N1268@ppco.com
Nabors 7E8
Sub
Hours Code Code
Start: 5/18/2003
Rig Release: 6/12/2003
Rig Number:
Spud Date: 5/18/2003
End: 6/12/2003
Group:
Phase
Description of Operations
5/21/2003
21 :00 - 00:00
3.00 CEMENT PUMP SURFAC CW100 followed by 50 Bbls 10.5 PPG Mud push and dropped bottom
plug, pumped 400 Bbls lead mixed at 10.7 PPG. cement to surface.
Mixed and pumped 167 Bbls of tail 12 PPG dropped top plug and
Dowell displaced with 20 Bbls wash water followed by 317.3 Bbls mud
displaced with rig pump at 6-7 BPM. Plug bumped with 1100 PSI and
floats held. Good returns and worked pipe until 400 Bbls lead pumped.
Good returns. 275 Bbls cement to surface. CIP 2353 Hrs. 5/21/03.
5/22/2003 00:00 - 01 :30 1.50 CEMENT PULD SURFAC Laid down Cement head, landing Jt. and changed bales.
01 :30 - 02:30 1.00 WELCTL NUND SURFAC Disconnect flowline and nipple down riser.
02:30 - 04:00 1.50 WELCTL NUND SURFAC Installed FMC speed head, set and tested packoff.
04:00 - 05:30 1.50 WELCTL NUND SURFAC Nippled up BOP.
05:30 - 09:00 3.50 WELCTL BOPE SURFAC Set test plug and filled stack with water. Tested Hydrill to 250/3500 psi.
Tested Top Rams, IBOP, Choke and Kill valves, Lower rams, Lower
IBOP, Floor Safety Valves, and Blind Rams to 250/5000 psi. Tested
VBR with 7" casing.
Tested Accumulator System. Chuck Shieve waived witiness of test.
09:00 - 09:30 0.50 DRILL PULD SURFAC Laid down test plug and set wear bushing.
09:30 - 17:00 7.50 DRILL PULD SURFAC Picked up 54 stands of DP and stood back in derrick.
17:00 - 20:00 3.00 DRILL PULD SURFAC Picked up BHA #2. attempted to test MWD pump 2 not pumping.
20:00 - 20:45 0.75 RIGMNT RSRV SURFAC Serviced top drive while checking out pump #2.
20:45 - 21:15 0.50 DRILL DEOT SURFAC Tested MWD and Geotap. Loaded RA source.
21:15 - 22:30 1.25 DRILL TRIP SURFAC RIH to jars and changed out jars.
22:30 - 22:45 0.25 DRILL TRIP SURFAC RIH with HWDP.
22:45 - 00:00 1.25 DRILL TRIP SURFAC RIH picking up drill pipe. 52 Jts. picked up.
5/23/2003 00:00 - 02:30 2.50 DRILL TRIP SURFAC RIH picking up DP to 4435'. Washed to 4439'.
02:30 - 03:00 0.50 DRILL CIRC SURFAC Circulated out clabered mud.
03:00 - 04:00 1.00 CASE DEOT SURFAC Rigged up and Tested casing to 2500 PSI for 30 min.
04:00 - 05:00 1.00 DRILL OTHR SURFAC Drilled out Float equipment and shoe track (first joint below FC took 0
WOB second took 3 to 5 K). Cleaned out rat hole.
05:00 - 05:15 0.25 DRILL DRLG SURFAC Drilled From 4537' to 4557'. TD RPM 60 WOB 10 K, GPM 453, PP
2500 PSI. ART .25 Hrs.
05:15 - 05:45 0.50 DRILL CIRC SURFAC CBU @ 500 GPM.
05:45 - 06:15 0.50 DRILL CIRC SURFAC Displaced to LSND mud.
06:15 - 07:00 0.75 DRILL FIT SURFAC Rigged up and did FIT. Results were lower than expected.
07:00 - 08:30 1.50 RIGMNT RSRV SURFAC Slipped and cut drilling line. Serviced rig.
08:30 - 12:30 4.00 DRILL TRIP SURFAC POOH laying down DP to BHA.
12:30 - 15:45 3.25 DRILL PULD SURFAC POOH and lay down BHA.
15:45 - 16:30 0.75 CEMENTTRIP SURFAC Made up muleshoe and RIH on DP to 4557'.
16:30 - 17:15 0.75 CEMENTCIRC SURFAC CBU.
17:15 - 20:30 3.25 CEMENT SOEZ SURFAC Pumped 5 Bbls. water, tested lines to 2000 PSI, pumped 10 Bbls. water
followed by 42 Bbls. Batch mixed Class G cement with 2% CaCL2 with
5 Bbls water behind. Displaced with Rig pump 60 Bbls. at 9.6 BPM with
382 PSI. CIP 1747 Hrs. 5/23/03. POOH and squeezed 9.9 Bbls.
cement with 1475 PSI. Held pressure for 1 hour pressure bled from
1475 to 1301 PSI. Bled back 1 Bbl. with 8.9 Bbls. to formation. Stopped
squeeze at 1915 hours. Released pressure at 2015 hours.
20:30 - 21 :00 0.50 CEMENT CI RC SURFAC CBU.
21 :00 - 22:45 1.75 CEMENTTRIP SURFAC POOH and laid down Mule shoe.
22:45 - 00:00 1.25 DRILL PULD SURFAC Pick up and make up BHA.
5/24/2003 00:00 - 02:00 2.00 DRILL PULD SURFAC Pick up and RIH with BHA.
02:00 - 05:00 3.00 DRILL TRIP SURFAC RIH picking up DP (99 Jts.) to 4045'.
05:00 - 08: 15 3.25 DRILL OTHR SURFAC Drilled cement stringers from 4045' to 4143' then firm (10 K WOB)
Printed: 6/24/2003 4:11 :54 PM
('
ConocoPhillips Alaska
Operations Summary Report
Legal Well Name: 3S-24
Common Well Name: 3S-24
Event Name: ROT - DRILLING
Contractor Name: N 1268 @ ppco.com
Rig Name: Nabors 7ES
Date From - To Hours Code Sub Phase
Code
5/24/2003 05:00 - 08: 15 3.25 DRILL OTHR SURFAC
08:15 - 08:45 0.50 DRILL CIRC SURFAC
08:45 - 09:30 0.75 DRILL OTHR SURFAC
09:30 - 10:30 1.00 DRILL CIRC SURFAC
1 0:30 - 11 :30 1.00 DRILL FIT SURFAC
11 :30 - 20: 15 8.75 DRILL DRLG INTRM1
20: 15 - 20:45 0.50 RIGMNT RSRV INTRM1
20:45 - 00:00 3.25 DRILL DRLG INTRM1
5/25/2003 00:00 - 00:00 24.00 DRILL DRLG INTRM1
5/26/2003 00:00 - 07:45 7.75 DRILL DRLG INTRM1
07:45 - 08: 15 0.50 RIGMNT RSRV INTRM1
08:15-11:00 2.75 DRILL DRLG INTRM1
11 :00 - 11 :30 0.50 RIGMNT RGRP INTRM1
11 :30 - 16:45 5.25 DRILL DRLG INTRM1
16:45 - 17:15 0.50 DRILL CIRC INTRM1
17:15 - 19:30 2.25 DRILL DRLG INTRM1
19:30 - 20:00 0.50 DRILL OTHR INTRM1
20:00 - 23:45 3.75 DRILL TRIP INTRM1
23:45 - 00:00 0.25 DRILL CIRC INTRM1
5/27/2003 00:00 - 00:30 0.50 DRILL CIRC INTRM1
00:30 - 01 :30 1.00 DRILL TRIP INTRM1
01 :30 - 14:00 12.50 DRILL DRLG INTRM1
14:00 - 14:30 0.50 DRILL CIRC INTRM1
14:30 - 14:45 0.25 DRILL DRLG INTRM1
14:45 - 15:00 0.25 DRILL OTHR INTRM1
15:00 - 17:00 2.00 DRILL REAM INTRM1
17:00 - 17:30 0.50 DRILL TRIP INTRM1
17:30 - 18:45 1.25 DRILL TRIP INTRM1
Page 3 of 11
Start: 5/18/2003
Rig Release: 6/12/2003
Rig Number:
Spud Date: 5/18/2003
End: 6/12/2003
Group:
Description of Operations
cement to 4441'.
CBU.
Drilled firm cement from 4441' to 4557'. Drilled new hole from 4557' to
4567'. ADT .1 Hr.
Circulated hole clean.
Rigged up and did FIT to 13 PPG EMW.
Drilled 8.5" Directional hole from 4567' to 5674'. TD RPM 100, WOB 25
K, GPM 550, PP 2422 PSI. ART 5.04 Hrs. AST .75 Hrs. Up Wt. 140 K,
Down 53 K, Rotate 87 K. Torque Off Btm. 10 K On Btm. 11 K.
Stood back 1 Stand and changed broken die in Grabber on TO.
Drilled 8.5" Directional hole from 5674' to 6149'. TD RPM 100, WOB 25
K, GPM 550, PP 2422 PSI. ART 2.05 Hrs. AST .25 Hrs. Up Wt. 140 K,
Down 53 K, Rotate 87 K. Torque Off Btm. 10 K On Btm. 11 K.
Drilled 8.5" Directional hole from 6149' to 8983'. TD RPM 100, WOB 25
K, GPM 550, PP 2870 PSI. ART 13.9 Hrs. AST .93 Hrs. Up Wt. 175 K,
Down 62 K, Rotate 102 K. Torque Off Btm. 15 K On Btm. 15 K. Max
Gas 2594 IU from C-40.
Switched from HL to rig power @ 2030 Hrs.
Drilled 8.5" Directional hole from 8983' to 9826'. TD RPM 110, WOB 25
K, GPM 550, PP 2900 PSI. ART 3.5 Hrs. AST .5 Hrs. Up Wt. 195 K,
Down 70 K, Rotate 105 K. Torque Off Btm. 16 K On Btm. 16 K.
Serviced rig and top drive.
Drilled 8.5" Directional hole from 9826' to 10109'. TD RPM 110, WOB
25 K, GPM 550, PP 2950 PSI. ART 2.3 Hrs. AST 2.8 Hrs. Up Wt. 200
K, Down 72 K, Rotate 110 K. Torque Off Btm. 17 K On Btm. 18 K.
Pull 1 stand and change dies in grabber on top drive.
Drilled 8.5" Directional hole from 10109' to 10770'. TD RPM 110, WOB
25 K, GPM 550, PP 2970 PSI. ART 2.85 Hrs. AST .27 Hrs. Up Wt. 210
K, Down 72 K, Rotate 110 K. Torque Off Btm. 17 K On Btm. 18 K.
Pumped sweep and circulated to lower ECD.
Drilled 8.5" Directional hole from 10109' to 10770'. TD RPM 110, WOB
25 K, GPM 550, PP 2970 PSI. ART .98 Hrs. AST .03 Hrs. Up Wt. 220
K, Down 72 K, Rotate 115 K. Torque Off Btm. 17 K On Btm. 18 K. Lost
500 PSI pump pressure.
Checked out pumps and surface equipment for leaks.
Note: Switched back to Hi line Power @ 2000 Hrs.
POOH wet looking for washout. Over pull 30 to 70 K. Found hole 17
stands and 1 single out. Washed out in slip area 1" X 1/4" lateral hole.
Laid down bad joint.
CBU and checked Pump pressure.
CBU.
RIH to 10989' without problem.
Drilled 8.5" Directional hole from 10989' to 12088'. TD RPM 110, WOB
25 K, GPM 540, PP 3180 PSI. ART 5.85 Hrs. AST .66 Hrs. Up Wt. 235
K, Down 77 K, Rotate 125 K. Torque Off Btm. 20.5 K On Btm. 18 K.
Circulated to lower ECD.
Drilled 8.5" Directional hole from 12088' to 12105'. TD RPM 110, WOB
25 K, GPM 540, PP 3180 PSI. ART.25 Hrs. AST .0 Hrs. Up Wt. 235 K,
Down 77 K, Rotate 125 K. Torque Off Btm. 20.5 K On Btm. 18 K.
Pipe stuck while drilling. Jared pipe free.
Back reamed from 12105' to 11430' while adding lube to mud.
POOH from 11430' to 11149' swabbed in 2 Bbls.
Flow checked well, no flow. RIH to 12090'.
Printed: 6/24/2003 4:11 :54 PM
(
ConocoPhillips Alaska
Operations Summary Report
Page 4 of 11
Legal Well Name: 3S-24
Common Well Name: 3S-24 Spud Date: 5/18/2003
Event Name: ROT - DRILLING Start: 5/18/2003 End: 6/12/2003
Contractor Name: N1268@ppco.com Rig Release: 6/12/2003 G rou p:
Rig Name: Nabors 7ES Rig Number:
Date From - To Hours Code Sub Phase Description of Operations
Code
5/27/2003 18:45 - 21 :00 2.25 DRILL CIRC INTRM1 Circulated and raised mud weight to 11.3 PPG. Max gas at BU 322 IU.
21 :00 - 00:00 3.00 DRILL TRIP INTRM1 POOH from 12090' to 9455'. Back reamed from 10865' to 10770'. No
other problems.
5/28/2003 00:00 - 05:30 5.50 DRILL TRIP INTRM1 Cont POOH from 9,455', Pulled Tight at 7,765', Backreamed from
7,765' to 7,500', Went Back Thru with No Problems, Cont POOH to
shoe - No Problems
05:30 - 08:15 2.75 DRILL TRIP INTRM1 POOH & LD 63 Jts of 5" DP and 18 Jts of 5" HWDP
08:15 - 08:45 0.50 DRILL TRIP INTRM1 Monitored Well- Static, Set Back Flex Dc's, MWD and Geo Tap Tool
08:45 - 09:00 0.25 DRILL SFTY INTRM1 Held PJSM with Sperry Sun on Removing Radioactive Sources
09:00 - 10:30 1.50 DRILL TRIP INTRM1 Removed Radioactive Sources, LD Bit, MM and Float Sub, Cleared Rig
Floor
10:30 - 11 :00 0.50 DRILL OTHR INTRM1 PU Test Jt & Pulled Wear Bushing
11 :00 - 14:00 3.00 WELCTL BOPE INTRM1 Installed Test Plug & Test BOP's, Tested Rams, Manifold and Valves to
250 Psi Low, 5,000 Psi High, Tested Annular to 250 Psi Low and 3,500
Psi High, John Spaulding with AOGCC Waived witnessing of BOP Test
14:00 - 14:30 0.50 DRILL OTHR INTRM1 Installed Wear Bushing and Blow Down Choke
14:30 - 17:30 3.00 DRILL TRIP INTRM1 PU BHA #4, RR Bit, Changed Out Pulser and Nuke Collar, Upload
MWD and Pulse Test Same
17:30 - 17:45 0.25 DRILL SFTY INTRM1 Held PJSM with Sperry Sun on Loading Radioactive Sources
17:45 - 18:30 0.75 DRILL TRIP INTRM1 Loaded Radioactive Sources & Fin TIH with BHA #4 to 402'
18:30 - 21 :00 2.50 DRILL TRIP INTRM1 PU 81 Jts of 5" DP from Pipe Shed & 16 Stds of Dp from Derrick & TIH
to 4,452' (Csg Shoe @ 4,527')
21 :00 - 00:00 3.00 RIGMNT RSRV INTRM1 Serviced Top Drive, Changed Oil & Filter, Checked & Tigthtend Bolts
5/29/2003 00:00 - 02:00 2.00 RIGMNT RSRV INTRM1 Fin Servicing Top Drive, Worked on Torque Boost, Tighted Elec Box's,
Change Dies on Gripper and Greased Wash Pipe Packing
02:00 - 03: 15 1.25 RIGMNT RSRV INTRM1 Cut & Slip 128' of Drlg Line, Adjust Brakes & Inspect Deadman
03: 15 - 03:30 0.25 DRILL CIRC INTRM1 RIH to 4,546' & Pulse Tested MWD & Caliper Tool at Shoe
03:30 - 09: 15 5.75 DRILL INTRM1 Cont RIH Filling Pipe Every 20 Stds, After 101 Stds in Hole Began
Installing Weatherford's SlickSleeve Tool to Assist in Lowering Torque,
Installed at 60' Intervals, To Cover from 2,200' to 200', Washed 93' to
Btm with No Problems
09:15 - 10:45 1.50 DRILL CIRC INTRM1 Circ Hole Clean after Trip, Max Gas at Btms Up, 400 Units, Circ at 500
Gpm at 2,700 Psi, ECD with 11.3 ppg Mud Prior to POOH was 12.9
ppg, After Circ Hole Clean after Trip ECD Still at 12.9, Would Usually
See .1-.2 ppg Drop in ECD after Trip But No Change Due to Slick-
Sleeve's
10:45 - 12:00 1.25 DRILL DRLG INTRM1 Drill from 12,105' to 12,200' MDI 5,492' TVD, ART .83 Hrs, 25-30K
WOB, 504 Gpm, Off Btm Press 2,680 Psi, On Btm 3,080 Psi, Off Btm
Torque 14.5K Ft#'s, On Btm 16.5K Ft#'s Rot Wt,120K, PU Wt 190K,
DN Wt 85K, Ave Bgg 85 Units, 11.3 MW with 13.0 ECD
12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill from 12,200 to 13,105' MD/ 5,852' TVD, ART 8.1 Hrs, AST .32 Hrs,
25-30K WOB, 90 Rpm's, Varied Pump Rates Due to ECD Climbing to
Around 13.8 ppg with 11.6 ppg MW, Pumped Btwn 450-475 Gpm and
Maintained Ave 13.6 ECD, at 475 Gpm Off Btm Press 2,810 Psi, On
Btm 3,270 Psi, at 450 Gpm Off Btm Press 2,542 Psi, On Btm 2,942 Psi,
Off BTm Torque 17K Ft#"s, On Btm 16K Ft#'s, Rot Wt 120K, PU Wt,
195K, Dn Wt 85K, Top of HRl,12,364'MD/5,557' TVD, Base of HRl
12,892'MD/ 5,767' TVD, While Drilling Below HRl Had Minor Mud Loss
1 st Hr Lost 55 bbls, Mixed & Pumped MIX II Fine & Med LCM and
Slowed Losses to Approx 25 BPH, Lost Approx 100 bbls Mud to Hole,
Noticed Slight Breathing on Last 2 Conn, Max Gas from Conn at
13,095' was 604 Units, Ave BGG 200 Units
5/30/2003 00:00 - 01 :00 1.00 DRILL DRLG INTRM1 Drill from 13,105' to 13,106', (1') ART .83 Hrs, Lost Diff Press at Bit,
Printed: 6/24/2003 4: 11 : 54 PM
(
f
ConocoPhillips Alaska
Operations Summary Report
Page 5 of 11
Legal Well Name: 38-24
Common Well Name: 38-24 8pud Date: 5/18/2003
Event Name: ROT - DRILLING Start: 5/18/2003 End: 6/12/2003
Contractor Name: N1268@ppco.com Rig Release: 6/12/2003 G ro up:
Rig Name: Nabors 7ES Rig Number:
Date From - To Hours Code Sub Phase Description of Operations
Code
5/30/2003 00:00 - 01 :00 1.00 DRILL DRLG INTRM1 Possibly Bit Balled Up
01 :00 - 01 :30 0.50 DRILL CIRC INTRM1 Circ Hole While Bringing Mud Materials to Pits and Attempting to get to
drill, No Change in Diff press, Varied WOB, GPM's & Rpm's with No
Success
01 :30 - 01 :45 0.25 DRILL OTHR INTRM1 Monitored Well & Performed Exhale Test, Init Rates After 5 Min 9 BPH,
after 10 Min Down to 6 BPH after 15 Min 2.6 BPH, Recovered 3.8 bbls
in 15 Min
01 :45 - 03:30 1.75 DRILL CIRC INTRM1 Pumped 2 - 40 bbl Nutplug Sweeps Back to Back to Clear Bit, Circ at
480 Gpm at 3,120 psi, Max Gas at Btms Up from Exhale Test 700
Units, Ave BGG 120 Units
03:30 - 06:45 3.25 DRILL DRLG INTRM1 Drilled from 13,106' to 13,192' MD/ 5,820' TVD, (86') ART 1.7 Hrs,
Pumped 2 Nutplug sweeps While Drlg to Clear Bit With Varying ROP's
F/25 FPH to 125 FPH, 20-40K WOB, 100 Rpm's, 500 Gpm at 2,950
Psi, 11.6 Mw with 13.0 ECD, Rot Wt 127K, PU Wt 206K, Dn Wt 85K,
Torque Off Btm, 18K Ft#'s, On Btm 17K Ft#'s, Mud Loss Ave < 10 BPH
06:45 - 08:00 1.25 DRILL CIRC INTRM1 Circ Hole Clean for Wiper Trip, Circ at 504 Gpm, 2,820 Psi at 100
Rpm's, Ave BGG 80 Units, Max Gas at Btms Up 150 Units, With 11.6
MW had 12.8 ECD
08:00 - 08:30 0.50 DRILL OBSV INTRM1 Monitored Well for 20 Min Well-Static
08:30 - 11 :15 2.75 DRILL WIPR INTRM1 Wiped Hole 18 Stds to 11,532', (Top of Morraine sand), Pulled Tight at
12,098' & 12,190', Backreamed from 12,215' -12,185' & 12,120' to
12,185', No Other Problems POOH
11:15 -12:30 1.25 DRILL WIPR INTRM1 RIH Slow to Btm, 13,192' with No Problems
12:30 - 14:15 1.75 DRILL CIRC INTRM1 Circ Hole After Wiper Trip, Max Gas 2,260 Units In & Out in 14 Min,
Ave Bgg 130 Units, Circ at 500 Gpm's at 2,900 Psi with 12.8 ECD
14:15 - 20:00 5.75 DRILL DRLG INTRM1 Drill from 13,192' to 13,358' MD/ 5,954' TVD, (166') ART 3.82 Hrs, 25K
WOB, 100 Rpm's, 204 SPM, 493 Gpm's, Off Btm Press 2,800 psi, On
Btm 2,920 psi, Torque Off Btm 18K Ft#'s, On Btm 19K Ft#'s, Rot Wt
128K, PU Wt 205K, DN Wt 90K, Ave ECD 12.8, Cont to Loose Press
Diff on MM, Pumped NutPlug Sweeps with No Sucess, Increased Lub's
to 3.5% and Still Unable to Get Consistent ROP, Torque Increased
While Drlg KUP C, Top of KUP C Est at 13,300' MD, 5,931' TVD,
Decision Made to Pull BHA
20:00 - 23:15 3.25 DRILL REAM INTRM1 Backreamed Out from 13,358' to 11,628' with No Problems, Circ at 480
Gpm at 2,450 psi, 75 Rpm's with 17K Ft#'s Torque, Ave BGG 100 Units
23:15 - 00:00 0.75 FRMTST OTHR INTRM1 Run Sperry Suns GEOTAP Tool, Ran 30' Corr Log for Tie in & Ck Ok,
RIH to 11,723' and Set Tool face to Low Side, Performed 1st Test at
11,627'
5/31/2003 00:00 - 01 :00 1.00 FRMTST OTHR INTRM1 Ran Geotap Press Survey's at 11,658' & 11,772',3 Samples Total, Had
2 Good Pressure Readings, 1-Lost Seal and No Reading at 11,772'. (1
3/4Hrs Total to Corr on Depth & Run 3 Test)
01 :00 - 01 :45 0.75 DRILL REAM INTRM1 Backreamed Out 4 stds from 11,868' to 11,532' to Above Top of
Morraine Sand
01 :45 - 03:00 1.25 DRILL CIRC INTRM1 Circ Btms Up From Above Morraine Sand, Backreamed Out Slow 3
Stds F/11 ,532' to 11, 251' W/Circ Btms Up, No Gas at Btms Up, Ave
BGG 80 Units, Circ at 500 Gpm at 2,600 psi, 85 Rpm's with 17K Ft#'s
Torque
03:00 - 12:00 9.00 DRILL TRIP INTRM1 Monitored Well-Static, POOH Wet 9 Stds, Pulled 50K Over at 10,388'
Backreamed Thru & Ck Ok, Cont POOH Wet to 8,969', (20 Stds)
Monitored Well-Static, Pumped Dry Job, POOH to Shoe & Monitored
Well- Static, Cont to POOH to 305' to BHA
12:00 - 12:15 0.25 DRILL SFTY INTRM1 Held PJSM with Sperry Sun on Removing Radioactive Sources
12:15 - 15:00 2.75 DRILL PULD INTRM1 Removed Radioactive Sources, Down Load MWD, LD BHA #4
Printed: 6/24/2003 4:11 :54 PM
)
)
Legal Well Name: 3S-24
Common Well Name: 3S-24 Spud Date: 5/18/2003
Event Name: ROT - DRILLING Start: 5/18/2003 End: 6/12/2003
Contractor Name: N1268@ppco.com Rig Release: 6/12/2003 Group:
Rig Name: Nabors 7ES Rig Number:
Date From:-To Hours Code
5/31/2003 12:15 - 15:00 2.75 DRILL PULD INTRM1 Including Geotap Tool, Bit 1/8" Undergauge, Gauge on Stab MM Ok,
Wear Pad on MM by Bend in Housing Worn Down
15:00 - 18:00 3.00 DRILL PULD INTRM1 PU Bit #3, 6 3/4" MM Set to -0-, PU BHA #5, Upload MWD & Surface
Test, Load Radioactive Sources & TIH with BHA #5 to 377'
18:00 - 20:45 2.75 DRILL TRIP INTRM1 TIH with BHA #5 to 4,521' (Csg Shoe)
20:45 - 21:15 0.50 RIGMNT RSRV INTRM1 Serviced & Inspected Top Drive
21 :15 - 22:15 1.00 RIGMNT RSRV INTRM1 Cut & Slipped 77' of Drlg Line, Inspected Brakes
22:15 - 00:00 1.75 DRILL TRIP INTRM1 Cont TIH to 7,459' with No Problems, Filling Pipe Every 25 Stds WITIH
6/1/2003 00:00 - 04:30 4.50 DRILL TRIP INTRM1 Cont TIH with BHA #5 from 7,459' to 13,011', Filling Pipe Every 25 Std,
No Problems RIH
04:30 - 06:30 2.00 DRILL REAM INTRM1 Precautionary Ream Down While Circ Btms Up from 13,011' to 13,358',
Reamed Down at 400 Gpm, 2,060 psi at 85 Rpm's, Max Gas at Btms
Up 580 Units, Ave BGG 160 Units
06:30 - 11 :30 5.00 DRILL DRLG INTRM1 Drilled from 13,358' to 13, 656' MD/6,068' TVD (TD) (298') ART 3.9
Hrs, Control Drilled KUP for Logs, Drilled at 10K WOB, 100 Rpm's, 495
Gpm, Off Btm Press 2,610 Psi, On Btm 2,730 Psi, Off Btm Torque 19K
Ft#'s, On Btm 18.5K Ft#'s, Rot Wt 132K, PU Wt 210K, DN Wt 90K, Ave
ECD 12.9, Ave BGG 140 Units
11 :30 - 12:00 0.50 DRILL CIRC INTRM1 Circ Hole Prior to Wiping Hole, Circ at 490 Gpm's, 2,610 Psi & 95
Rpm's
12:00 - 12:30 0.50 DRILL WIPR INTRM1 Backreamed Out 4 Stds from 13,656' to 13,198' with No Problems
12:30 - 13:00 0.50 DRILL WIPR INTRM1 TIH to 13,572', Washed 84' to Btm with No Problems
13:00 - 13:45 0.75 DRILL CIRC INTRM1 Circ Btms Up, Max gas at Btms up 192 Units, Circ at 475 Gpm at 2,550
Psi and 15K Ft#'s Torque
13:45 - 18:15 4.50 DRILL REAM INTRM1 Backreamed Out from 13,656' to 11,507', to Above Top of Morraine,
Spotted LCM Pill across C Sand, Removed SlickSleeves FIDP While
POOH, Monitored Well-Static
18:15 - 19:30 1.25 DRILL CIRC INTRM1 Circ Btms Up at 11,507', Max Gas 165 Units, Circ at 480 Gpm, 2,215
Psi
19:30 - 00:00 4.50 DRILL TRIP INTRM1 Monitored Well at 11 ,507'-Static, POOH 10 Stds Wet to 10,281' with No
Problems, Monitored Well-Static, Pumped Dry Job and Cont POOH to
4,901', Pulled 25K Over at 10,536' & 10,780' Worked Thru Each, No
Other Problems POOH, Hole taking Over Calc Fill on Trip Out
6/212003 00:00 - 02:30 2.50 DRILL TRIP INTRM1 POOH from 4,901' to 3,294', Monitored Well At Shoe- Static
02:30 - 04:00 1.50 DRILL PULD INTRM1 POOH LD 93 Jts of Excess 5" DP to 377'
04:00 - 04:30 0.50 DRILL TRIP INTRM1 POOH & Stood Back Hwdp & Jars
04:30 - 04:45 0.25 DRILL SFTY INTRM1 Held PJSM with Sperry Sun on Removing Radioactive Sources
04:45 - 07:30 2.75 DRILL PULD INTRM1 Removed Radioactive Sources, Downloaded MWD, POOH & LD BHA
07:30 - 07:45 0.25 DRILL OTHR INTRM1 Pulled Wear Bushing
07:45 - 09: 15 1.50 CASE RURD INTRM1 RU Nabors Csg Equip with Franks Fill Up Tool, Changed Out Elevator
Bails
09:15 - 09:30 0.25 CASE SFTY INTRM1 Held PJSM on Running 7" Csg
09:30 - 16:30 7.00 CASE RUNC INTRM1 Run 7" Csg, MU 7" Float Shoe, 5 Jts 7",26#, L-80, BTC-Mod and Float
Collar, Ck'd Float Equip & Ck Ok, Cont RIH with 106 Jts 7" Csg to
4,506' (Csg Shoe)
16:30 - 17:00 0.50 CASE CIRC INTRM1 Circ Btms Up at 5 BPM at 455 Psi, Est ave 5-10 BPH Static Mud Loss
17:00 - 20:45 3.75 CASE RUNC INTRM1 RIH with Add 69 Jts of 7" Csg (175 Total) to 7,427' with No Problems
20:45 - 21 :30 0.75 CASE CIRC INTRM1 Staged Pumps Up to 5 Bpm at 600 Psi and Circ Hole, Up Wt 150K, Dn
Wt 68K, Static Losses Cont to Ave 3-6 BPH
21 :30 - 00:00 2.50 CASE RUNC INTRM1 Cont RIH with 7" Csg at 9,386' with No Problems
6/3/2003 00:00 - 00:45 0.75 CASE RUNC INTRM1 RIH Add 9 Jts 7" Csg (230 Jts Total) to 9,793' with No Problems
00:45 - 01 :00 0.25 CASE CIRC INTRM1 Est Circ at 9,793', Staged Pumps Up to 5 Bpm at 800 Psi, 11.5+ ppg
MW in, 11.6 MW Out, Up Wt 190K, Dn Wt 75K
Printed: 6/24/2003 4: 11 :54 PM
)
)
ConocoPhil.lips>Alaska
Operalions Su I'll mary FlØport .. .
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
3S-24
3S-24
ROT - DRILLING
N1268@ppco.com
Nabors 7ES
Start: 5/18/2003
Rig Release: 6/12/2003
Rig Number:
Spud Date: 5/18/2003
End: 6/12/2003
Group:
Sub·.·
Code
2.25 CASE RUNC INTRM1 RIH with 265 Jts of 7" csg to 11,255', After MU Jt #266, Attempted to
RIH and Pipe Would not go down
6.00 CASE CIRC INTRM1 Est Circ, Stage Up to 5 Bpm at 750 Psi and Began Working 7" Csg,
Last Up Wt 200K, Dn Wt 80K, Worked 7" Up to a Max of 475K #'s and
Down to 30K with No Movement, Cont to Work Csg from 350K Up and
50K Down with No Movement, Ave 1 Bph Mud Loss WICirc with 11.5+
MW In & Out, Decision Made to Cement Csg in Place, Float Shoe at
11,255' MDI 5,139' TVD, Float Collar at 11,043'
RIH with a Total of 265 Jts, 11,228.52' Including fit Equip
2.00 CASE CIRC INTRM1 Mixed & Pumped 40 bbl Drlg Detergent Sweep at 8.4 ppg While
Waiting on 12.0 ppg Cmt to arrive Loc., Cont to Work Pipe at 350K Up
and 50K Dn While Sweep Cleared Shoe with No Movement, Circ at 5
Bpm at 675 Psi
LD 7" Jt #266 and RD Franks Fill Up Tool, MU Dowell Cement Head &
Line
Cont to Circ Hole Prior to Cementing 7" csg and Dowell Offloaded Cmt
into Silo in Preparation to Cement 7" Csg, Circ at 5 Bpm at 560 Psi, No
Mud Loss
Held PJSM with Dowell & Rig Crew on Cementing 7" Csg
RU Dowell, Pumped 10 bbls CW 100 Chern Wash @ 8.3 ppg, Tested
Lines to 3,500 Psi, Pumped 40 bbls CW 100 Chern Wash at 8.3 ppg @
4.8 Bpm @ 560 Psi, Dropped Btm Plug, Pumped 50 bbls of 12.0 ppg
Mudpush spacer @ 4.0 bpm @ 630 psi, Mixed & Pumped 75 bbls, 184
sxs of Lite Crete Cmt w/1.0%D65, .6%D46, .5%S 1, .5%D79 @ 12.0
ppg & 2.29 Yield, Pumped @ 4.0 Bpm @ 475 Psi
1.50 CEMENT DISP INTRM1 Dropped Top Plug & Dowell Pumped 20 bbls Wash Water, Turned over
to Rig, Rig Pumped 404.5 bbls of 11.6 ppg mud, Ave Disp Rate 5.0
bpm @ 590 Psi, Slowed to 3 bpm @ 390 Psi on last 10 bbls, Bumped
Plug to 1,000 Psi, Casing stuck throughout Job, Had Full Returns
throughout Job- CIP at 1600 Hrs 6/3/03, Check Floats & Held, Well
static.
RD Cement Head & Lines
ND Bop's
Landed 7" Csg on 10" x 7" C-21 Emergency Csg Slips, Set 155K Wt on
Slips, Made Rough Cut & LD Cut Off Jt, Dressed 7" for Pack-off, Set
Pack-Off and Tested Same to 5,000 Psi & Had Good Test
NU BOP's
RD Csg Equipment
Changed Out Top Set of VBR Rams on BOP Stack to 4" DP and Began
Changing Top Drive Over to 4" HT 38
Removed 5" Drlg Tools Off Rig Floor, Change Top Drive Over to 4"
Grabber-Guides, PU 4" Tools to Rig Floor
RU & Tested BOP's, Choke Manifold, Rams and All Valves to 250 Psi
Low and 5,00 Psi High, Annular to 250 Psi and 3,500 Psi, 4" TIW and
Dart Valves Failed, Changed Out & Retested & Ck Ok, Tested Rams
with 4" DP & 31/2" Tbg,
NOTE: Jeff Jones with AOGCC Waived Witnessing of BOP Test
Installed Wear Bushing
LD 333 Jts of 5" Drill Pipe from Derrick
Sim-Op's: Performed LOT on 7" x 9 5/8" Annulus to a 18.9 ppg EMW I
Flushed with 130 bbls FW and Freeze Protected with 80 bbls Diesel
Removed Sperry Sun's Down Link Skid Used for GeoTap from Rig
Floor, Changed Over Iron Roughneck to 4" DP and Cleared Rig Floor
Frotn;. To
6/3/2003
01 :00 - 03:15
03:15 - 09:15
09:15 -11:15
11:15-12:30 1.25 CASE RURD INTRM1
12:30 - 13:15 0.75 CASE CIRC INTRM1
13:15 - 13:30 0.25 CEMENT SFTY INTRM1
13:30 - 14:30 1.00 CEMENT PUMP INTRM1
14:30 - 16:00
16:00 - 17:15 1.25 CEMENT RURD INTRM1
17:15 - 18:15 1.00 CASE NUND INTRM1
18:15 - 20:30 2.25 CASE OTHR INTRM1
20:30 - 22:00 1.50 CASE NUND INTRM1
22:00 - 22:45 0.75 CASE RURD INTRM1
22:45 - 00:00 1.25 WELCTL OTHR INTRM1
6/4/2003 00:00 - 02:30 2.50 DRILL RIRD INTRM1
02:30 - 09:00 6.50 WELCTL BOPE INTRM1
09:00 - 09:30 0.50 DRILL OTHR INTRM1
09:30 - 20:00 10.50 DRILL PULD INTRM1
20:00 - 21 :00 1.00 DRILL RIRD INTRM1
Printed: 6/24/2003 4:11 :54 PM
)
)
Legal Well Name: 3S-24
Common Well Name: 3S-24
Event Name: ROT - DRILLING
Contractor Name: N 1268 @ ppco.com
Rig Name: Nabors 7ES
·Date From-To Hours Code . Sub
·Code
6/4/2003 21 :00 - 00:00 3.00 DRILL PULD INTRM1
6/5/2003 00:00 - 01 :00 1.00 DRILL PULD PROD
01 :00 - 04:00 3.00 DRILL PULD PROD
04:00 - 14:00 10.00 DRILL TRIP PROD
14:00 - 14:30 0.50 DRILL CIRC PROD
14:30 - 15:30 1.00 DRILL CIRC PROD
15:30 - 16:15 0.75 CASE DEQT PROD
16: 15 - 21 :00 4.75 CEMENT DSHO PROD
Start: 5/18/2003
Rig Release: 6/12/2003
Rig Number:
Spud Date: 5/18/2003
End: 6/12/2003
Group:
21 :00 - 22:30 1.50 DRILL REAM PROD
22:30 - 23: 15 0.75 DRILL CIRC PROD
23: 15 - 00:00 0.75 DRILL TRIP PROD
6/6/2003 00:00 - 01 :15 1.25 DRILL CIRC PROD
01 :15 - 02:00 0.75 DRILL TRIP PROD
02:00 - 03:45 1.75 DRILL REAM PROD
03:45 - 06: 15
2.50 DRILL CIRC PROD
06:15 - 08:15 2.00 DRILL WIPR PROD
08: 15 - 09:45 1.50 DRILL WIPR PROD
09:45 - 10:30 0.75 DRILL CIRC PROD
10:30 - 16:00 5.50 DRILL TRIP PROD
16:00 - 17:00 1.00 DRILL CIRC PROD
17:00 - 18:45 1.75 DRILL TRIP PROD
18:45 - 20:30 1.75 DRILL CIRC PROD
20:30 - 21 :30 1.00 DRILL OBSV PROD
21 :30 - 22:15 0.75 DRILL TRIP PROD
DescriptiohofOperations
PU 90 Jts of 4" HT-38 DP & RIH Open Ended
POOH with 30 Stds of 4" HT 38 DP & Stood Back
PU 61/8" Bit #4, 5" MM -0- Bend, MWD Jars & HWDP, Surface
Tested MWD & Ck Ok
TIH with BHA #6 from 417', PU 4" HT 38 DP WITIH, Started Taking Wt
at 10,987', (Est TOC at 10,975') Fit Collar at 11,043'
Cleaned Out Soft Cmt from 10,987' to 10,998'
Circ Btms Up for Csg Test, Evened MW In & Out at 11.5 ppg, Circ at
250 Gpm at 2,650 Psi
RU & Tested 7" Csg to 3,500 Psi for 30 Min, Good Test
Drilled Up 2 Plugs, Fit Collar at 11,043', Drilled Med - Hard Cmt in Shoe
Trac and Drilled Fit Shoe at 11,255', 1 0-12K WOB, 80 Rpm's, 250 Gpm
at 2,680 Psi, Rot Wt 85K, Up Wt 180K, Dn Wt 50K, On & Off Btm
Torque 12K Ft#'s, Drilled Thru Shoe and Had No Mud Loss
Washed Down Slowly from 11,255' to 11,377' (122') with No Problems
or Fill
POOH from 11,377' 1 Std to 11,284' and Circ Btms Up, Circ at 250
Gpm at 2,680 Psi, No Gas on Btms Up
TIH Slow from 11,284' to 12,230' with No Problems
Est Circ & Washed Down F/12,230' to 12,325', Circ Btms Up, Max Gas
235 Units, Circ at 250 Gpm, 2,800 Psi, 70 Rpm's 13K, No Mud Loss
TIH Slow to 13,272' with No Problems
Washed Down F/13,272' to 13,656', Hole attempting to pack off on Btm,
Slowed Circ & Worked Pipe and Cleaned Up, Circ at 200 Gpm, 2,475
Psi at 90 Rpm's, at Btms Up had a Max Gas of 1,910 Units, BGG Ave
100 Units
Circ Weighted Sweep & Circ Out, Had 30% Increase in Cuttings Back,
Circ Hole at 230 Gpm, 90 Rpm's, No Problems Rotating Down, While
Working Pipe Up Rotary would slow to 40 Rpm's, Circ Total of 2 Btms
Up
Wiped Hole 25 Stds to Shoe at 11,255', No Problems
Monitor Well, RIH to 13,470', Precautionary wash to 13,656' - No
problems
Stage pump rate up to 250 gpm @ 3000 psi, Circ capacity of open hole
volume with no problems, Increase flow rate to 300 gpm 3320 psi &
hole packed off with 300 psi - lost 75 % returns
Pump out of hole to shoe slow wI 2.3 bpm @ 930 psi, very poor returns,
hole swabbing when pulling pipe & breathing. Add 12 - 13 Ib/bbl MIX II
& Fine nutplug LCM to mud pits, Lost total of 125 bbls mud from
13,656" to Shoe.
Circ & monitor losses, Pump 3 bpm @ 1540 psi (Pumping 180 bph -
losing 92 bph), Monitor breathing for 45 min., started off at 4.4 bph &
decreased to static, Monitor well- static
POOH to 9,567', Pumped out first 3 stands, then put well on trip tank,
hole taking proper fill. (Did not notice any excess drag or cuttings beds
in casing.)
Circ. wI full returns at 3 bpm @ 1225 psi, Increased rate to 3.5 bpm @
1300 psi & had 75% returns, Circ btms up had 285 units trip gas. (Lost
61 bbls from shoe to 9567')
Monitored well, Well Breathing, Init Rate of 37 Bph, rate Decreased
Down to 12 Bph/.2 Bpm in 30 Min and 6 Bph/.1 Bpm after 1 Hr,
Recovered 13.5 bbls during Test
POOH from 9,567' to 8,904', Hole Not Taking Proper Fill
Printed: 6/24/2003 4: 11 :54 PM
)
)
Legal Well Name: 38-24
Common Well Name: 38-24 Spud Date: 5/18/2003
Event Name: ROT - DRILLING 8tart: 5/18/2003 End: 6/12/2003
Contractor Name: N1268@ppco.com Rig Release: 6/12/2003 Group:
Rig Name: Nabors 7ES Rig Number:
Date From- To Hours Code Sub Phase Description.ofOperations
Code
6/6/2003 22: 15 - 23:45 1.50 DRILL CIRC PROD Circ Btms Up from 8,904', No Gas on Btms Up, Circ at 3 Bpm 1,125 Psi
at 60 Rpm's, Circ Out a Large Amount of LCM, Ave Bgg 40 Units, Circ
with 95% Returns, Lost 9 bbls W/Circ
23:45 - 00:00 0.25 DRILL OBSV PROD Monitored Well, Breathing Slightly, Init Rate 12 Bph/.2 Bpm after 15 Min
Down to 4 Bphl .06 Bpm
Lost a Total of 195 bbls Mud to Hole
6/7/2003 00:00 - 00: 15 0.25 DRILL OBSV PROD Fin Monitoring Well at 8,904', Well-Static
00:15 - 07:30 7.25 DRILL TRIP PROD POOH Slow, Hole Taking Calc Displacement, Pumped Dry Job at
6,440', Cont POOH to BHA
07:30 - 09:30 2.00 DRILL TRIP PROD Stood Back HWDP & Jars, LD MWD & MM, Bit's Flow Courses 90%
Plugged Off
09:30 - 10:00 0.50 DRILL TRIP PROD MU BHA #7 on Bit #5 and RIH
10:00 - 12:30 2.50 DRILL TRIP PROD TIH Slow to 4,221', Monitoring Returns, Had Good Pipe Disp.
12:30 - 13:00 0.50 DRILL CIRC PROD Est Circ at 4,221' at 3 Bpm at 410 Psi WINo Losses
13:00 - 14:15 1.25 DRILL TRIP PROD TIH to 6,596'
14:15 - 14:45 0.50 DRILL CIRC PROD Est Circ at 6,596' at 3 Bpm at 530 Psi, Staged Up to 4.75 Bpm at 830
Psi and No Mud Loss
14:45 - 15:30 0.75 DRILL TRIP PROD TIH to 8,017' with Good Pipe Disp.
15:30 - 16:15 0.75 DRILL CIRC PROD Circ Btms Up, Init Rate 3 Bpm at 590 Psi, Final Rate 4.5 Bpm at 1,010
Psi, Rot at 60 Rpm's at 12K Ft#'s Torque, No Loss
16:15 - 18:00 1.75 DRILL TRIP PROD TIH to 11,249' (Shoe at 11,255')
18:00 - 20:15 2.25 DRILL CIRC PROD Circ Btms Up While Servicing Top Drive and Cut & Slip 116' of Drlg
Line, Init Rate 2 Bpm at 720 Psi, Final rate 3 Bpm 1,090 Psi, Circ with
80-90% Returns
20:15 - 21 :00 0.75 DRILL TRIP PROD TIH to 12,596' with No Problems
21 :00 - 21 :45 0.75 DRILL CIRC PROD Est Circ at 2 Bpm at 800 Psi with 5ppb LCM in DP and 90% Returns,
Staged Pump Rate to 4 Bpm at 1,040 Psi and Returns Decreased to
60%, Circ 1 1/2 OH Volume
21 :45 - 22:30 0.75 DRILL TRIP PROD TIH Slow to 13,587' with No Problems, Hole Breathing, Gained Add 5
bbls Over Calc Displ W/RIH
22:30 - 23: 15 0.75 DRILL REAM PROD Est Circ at 2 Bpm at 875 Psi and Washed Down from 13,587' to 13,656'
with No Problems, Rot Wt 100K, Up Wt 160K, Dn Wt 65K, at 60 Rpm's
had 10K Ft#'s Torque
23:15 - 00:00 0.75 DRILL CIRC PROD Circ Hole at 13,656' to Monitor for Losses, Mixing 5 ppb LCM W/Circ,
Init Rate 2 Bpm at 875 Psi, Increased to 2.5 Bpm at 980 Psi with 80%
Returns
Mud Lost to Hole Last 24 Hrs 173 bbls
6/8/2003 00:00 - 05:15 5.25 DRILL CIRC PROD Circ Hole Monitoring Losses, Varied Pump rates from 1 1/2 to 3 Bpm,
Initially Circ with 5 ppb and 70% Returns, Increased LCM to 10 ppb
then to 15 ppb and Losses slowed to 10-15% at 3 BPM at 1,130 Psi,
Max Gas at Btms Up 1140 Units, Circ a Total of 2 Btms Up, Rotated
Pipe at 60 Rpm's with 12K Ft#'s Torque, Rot Wt 100K, Up Wt 160K, Dn
Wt 65K, Ave BGG 60 Units, Lost Approx 100 bbls Mud While Circ and
Adding LCM
05:15 - 06:15 1.00 DRILL OBSV PROD Performed Exhale Test, Initial Rate 21.6 BPH Ave, after 30 Min slowed
to 6 BPH Ave, after 1 Hr Ave 1.5 BPH, Recovered 9 bbls during test
06:15 - 11 :15 5.00 DRILL TRIP PROD Spot 40 bbl, 30 ppb G-Seal LCM at bit, Pumped out spotting LCM
across KUP Sand. Attempt to POOH - hole swabbing, pump out to
shoe. POOH to 11,154' Lost 10.5 bbls over pipe displacement.
11:15 -13:45 2.50 DRILL CIRC PROD Circ btm's up @ 11, 154'at rate of 3 bpm @ 890 psi, loss rates ranged
from 66 bph to 28 bph, lost total 50 bbls while circ. Max gas 110 units-
down to 40 units.
13:45 - 14:45 1.00 DRILL OBSV PROD Performed Exhale Test, Initial Rate 43.2 BPH Ave, after 30 Min slowed
Printed: 6/24/2003 4: 11 :54 PM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
38-24
38-24
ROT - DRILLING
N 1268@ ppco.com
Nabors lE8
8tart: 5/18/2003
Rig Release: 6/12/2003
Rig Number:
Spud Date: 5/18/2003
End: 6/12/2003
Group:
Date From-To Hours· cOdeðóJe
6/8/2003
13:45 - 14:45 1.00 DRILL OBSV PROD to 6 BPH Ave, Recovered 10.4 bbls during test
14:45 - 22:00 7.25 DRILL TRIP PROD POOH Monitoring Well, POOH to BHA at 382'
22:00 - 23:30 1.50 DRILL PULD PROD POOH & LD BHA#7, HWDP, Jars, Flec DC's, Stab & Bit, Cleared Rig
Floor
23:30 - 00:00 0.50 CASE RURD PROD Began RU Nabors Equipment to Run 31/2" Liner
6/9/2003
00:00 - 00:45
00:45 - 04:30
0.75 CASE RURD PROD
3.75 CASE PULR PROD
04:30 - 06:00 1.50 CASE PULR PROD
06:00 - 06:30 0.50 CASE CIRC PROD
06:30 - 09:45 3.25 CASE RUNL PROD
09:45 - 10:15 0.50 CASE CIRC PROD
10:15 - 12:30 2.25 CASE RUNL PROD
12:30 - 13:00 0.50 CASE CIRC PROD
13:00 - 14:30 1.50 CASE RUNL PROD
14:30 - 16:45 2.25 CASE CIRC PROD
16:45 - 19:30 2.75 CASE RUNL PROD
19:30 - 23:00 3.50 CASE CIRC PROD
23:00 - 00:00
1.00 CEMENT PUMP PROD
6/1 0/2003
00:00 - 02:00
2.00 CEMENT PUMP PROD
Mud Lost Last 24 Hrs: 168 bbls, Total Mud Lost to Hole 536 bbls
Fin RU Nabors Liner Running Equipment
PU & MU 31/2" Liner, RIH with 31/2" 9.3# L-80 SLHT Liner, Ran Baker
"V" Set Float Shoe, 2 Jts 31/2" Liner, Baker Fit Collar, 1 Jt 31/2"
Liner, Baker Landing Collar, RIH with 11 Jts of 3 1/2" Liner, 1-Pup Jt
5.80' Long for Marker Jt, 64 Jts 3 1/2" Liner (Total 78 Jts with Pup & Fit
Equip, 2,485.91 ') Ran 7 Bow Spring Centralizers, 10 Straight Blade
Centralizers with 11 Stop Ring
PU & MU Baker 7" x 5" ZXP Liner Top Pkr W/HR Profile & Flex Lock
Hanger with 3.78' Pup Jt on Btm and RIH, Liner Wt 13K#'s (Total
Length 56.22')
TIH with 1 Std of 4" DP & Liner to 2,647' and Circ 1 Liner Cap, Liner Wt
47K, Dn Wt 42K
RIH with 31/2" Liner on 4" DP to 6,391' with Good Pipe Displacement,
Up Wt 85K, Dn Wt 55K
Est Circ at 6,391' at 2.5 Bpm at 525 psi, No Losses
TIH with Liner to 9,239'
Est Circ at 2.5 Bpm at 750 Psi with No Losses, Non Rot Up Wt 100K,
Dn Wt 60K
TIH with Liner to Shoe at 11,255', No Problems and Good Pipe
Displacement
Circ Btms Up at Shoe, 11,255', Circ at 2.5 Bpm 850 Psi, Increased to 3
Bpm at 900 Psi with No Mud Loss, Max Gas 130 Units, Rot Wt 83K, Up
Wt 98K, Dn Wt 73K
TIH with Liner, Stuck in Slips at 12,600', Pulled 250K to Free, Cont to
TIH Working Liner to Btm, Hole Sticking, Tagged Btm at 13, 656'
Circ & Cond Hole for Cementing, Adding 10 ppb LCM to Mud, Est Circ
at 2 Bpm at 940 Psi with 90% Returns, Increased Rate to 2.5 Bpm at
1,190 Psi, Rotated & Reciprocated Liner, Rot at 15 Rpm's with 10K
Ft#'s Torque, Returns at 2.5 Bpm Ave 65%, Began Pumping 15 ppb
LCM. At Btms Up Max Gas 220 Units, Rot Wt 100, Up Wt 105K, Dn Wt
88K, Held PJSM on Cementing 3 1/2" Liner with Dowell & Rig Crew
Turned Over To Dowell, Pumped 2 bbls Water and Press Tested Lines
to 4,500 Psi, Pumped 55 bbls Mud Push Spacer at 12.5 at 2.7 Bpm at
950 Psi, Began Pumping Cmt at 23:38 Hrs, To Pump 198 bbls, 950 sxs
of Gas Block Cement with Add at 15.8 ppg, 1.17 Yield, As of 24:00 Hrs
Have Mixed & Pumped 60 bbls of Slurry at 2.7 Bpm at 500 Psi, Cont to
Rotate & Reciprocate Pipe, Rot Wt 100K Up Wt 125K, Dn Wt 93K with
10K Ft#'s Torque, Had 90% Returns While Pumping Mud Push, Cont to
Have Good Returns While Pumping Cement
Finished pumping 15.8 ppg G cement wI adds, 1.17 Yield. Flushed
cement lines to rig floor, dropped wiper plug, Dowell Pumped 2 bbls
FW, Turned Over to Rig and began displacing cmt with 11.4 ppg mud
@ 3 bpm 650 to 1570 psi to a total of 141.0 bbls to bump plug with
3000 psi to set hanger. (Note: Had full returns until last 52 bbls of
displacement, then started to lose returns- Lost total of 38 bbls thru out
displacement) , CI P @ 0145 hrs 6/10103, Bled back 2.0 bbls - Floats
Printed: 6/24/2003 4: 11 :54 PM
)
Legal Well Name: 3S-24
Common Well Name: 3S-24
Event Name: ROT - DRILLING
Contractor Name: N1268@ppco.com
Rig Name: Nabors 7ES
Date .. From... To . Sub
Hours Code Code
6/1 0/2003 00:00 - 02:00 2.00 CEMENT PUMP PROD
02:00 - 02:45 0.75 CEMENTCIRC PROD
02:45 - 03:15 0.50 CEMENT RURD PROD
03:15 - 05:00 1.75 CEMENTCIRC PROD
05:00 - 05:45 0.75 CEMENTRURD PROD
05:45 - 18:30 12.75 DRILL PULD PROD
18:30 - 19:30 1.00 DRILL PULD PROD
19:30 - 20:30 1.00 DRILL PULD PROD
20:30 - 21 :30 1.00 RIGMNT RSRV PROD
21 :30 - 22:00 0.50 CMPL TN RURD CMPL TN
22:00 - 22: 15 0.25 CMPL TN SFTY CMPL TN
22:15 - 00:00 1.75 CMPL TN RUNT CMPL TN
6/11/2003 00:00 - 09:15 9.25 CMPL TN RUNT PROD
09:15 - 10:45 1.50 CMPL TN DEOT PROD
1 0:45 - 11: 15 0.50 CMPL TN RUNT PROD
11:15-14:00 2.75 CMPLTN CIRC PROD
14:00 - 16:00 2.00 CMPL TN PULD PROD
16:00 - 17:00 1.00 CMPL TN DEOT PROD
17:00 - 18:45 1.75 CMPL TN DEOT PROD
18:45 - 19:45 1.00 CMPL TN PULD PROD
19:45 - 20:30 0.75 CMPLTN RURD PROD
20:30 - 21 :30 1.00 CMPL TN NUND PROD
21:30-23:15 1.75 CMPLTN NUND PROD
23:15 - 00:00 0.75 CMPL TN NUND PROD
6/12/2003 00:00 - 01 :30 1.50 CMPL TN NUND CMPL TN
01 :30 - 02:30 1.00 CMPL TN SEOT CMPL TN
02:30 - 05:00 2.50 CMPL TN FRZP CMPL TN
05:00 - 06:00 1.00 CMPL TN RURD CMPL TN
Start: 5/18/2003
Rig Release: 6/12/2003
Rig Number:
Spud Date: 5/18/2003
End: 6/12/2003
Group:
held OK, After setting hanger & Packer. Rotated & Reciprocated Liner
until last 20 bbls of bumping plug.
CBU @ 400 GPM.
Rigged down cement line and laid down 1 Jt. DP.
Circulated BU X 3, circ out 50 bbls MudPUSH & est. 20 bbls cement.
Rigged down cement head and pumped dry job.
Laid down 4" DP from the hole and derrick.
Laid down liner running tools and pulled wear bushing.
Changed top drive back to 41/2" IF connections.
Serviced Rig and top drive.
Rigged up to run tubing.
PJSM.
Made up seals and RIH picking up tubing.
Running completion picking up 3 1/2" tubing to 11104'.
Rigged up and tested liner lap to 3500 PSI for 30 min.
Continue running completion. Tagged with locator @ 11,120'. laid down
1 Jt.
Pumped 40 Bbls. Hi Vis followed by 200 Bbls. fresh water then
displaced to seawater.
Spaced out and landed tubing. Ran in lock down screws.
Pumped down tubing had communication with annulus. 2 BPM @ 830
PSI.
Picked up and laid down tubing hanger. Picked up 1 Jt. tubing and a
pup Jt. retested seals. Same result. PU out of PBR while pumping and
pressure droped to 150 PSI.
Spaced out and relanded tubing hanger.
Rigged down tubing running equipment and blew down pumping hose.
Changed top rams to 2 7/8" X 7".
Nippled down BOP.
Nipple up Xmas tree.
Nippled up Xmas tree.
Tested tree to 5000 PSI.
Rigged up and pumped 182 Bbls diesel to freeze protect well.
Rigged up Jubracator and set BPV. Secured well and released rig @
0600 6/12/03.
Printed: 6/24/2003 4: 11 :54 PM
Date
05/18/03
05/19/03
06/14/03
06/15/03
06/16/03
06/20/03
06/21/03
06/22/03
35-24 Event History
)
Comment
RIG SUPPORT, RU AND STBY FOR RIG.
GYRO RUNS TO 89' (3), 180', 270' & 360' SLM.
GAUGED TBG TO 2.775" TO 11500' SLM. REPLACED SHEARED 1" DCR @ 11018' RKB W/ DV (***NOT 1-
1/2" AS DRILLING COMPLETION DETAIL INDICATED***). TBG & CSG TESTED TO 3000 PSI, GOOD. [TAG,
PT TBG-CSG]
PERFORMED A FCO TO 13,521' CTMD. WASHED ALL MANDRELS. WELL FREEZE PROTECTED TO
2,500'. LEFT FUSELESS ON MANSTAND FOR WIRELlNE. [FCO]
DRIFTED TBG W/23' X 2.5875"DUMMY GUN. TAGGED FILL @ 13519' WLM. [TAG]
SCMT PRE PERF. CEMENT BOND QUALITY WAS VERY GOOD FROM 13530' TO 11144', TAGGED TD AT
13542'
PERFORATED: 13332'-13362', 6SPF -- SBHP AT 13147' PRESS= 2475.4 PSIA ,TEMP= 155.4 DEGF AND
SBHP AT 13347' PRESS= 2509.1 PSIA, TEMP= 160.4 DEGF -- PERFORATE 13302'-13332',6 SPF.
PERFORATED: 13294' - 13302' AND 13362' - 13370', 6 SPF POWERJET.
Page 1 of 1
6/23/2003
)
)
30-Jun-03
AOGCC
Lori Taylor
3016 Porcupine Drive
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well 3S-24 GYRO
Dear Lori Taylor
Enclosed are two survey hard copies and one disk
Tie-on Survey:
Window I Kickoff Survey:
Projected Survey:
0.00' MD
0.00' M D (if applicable)
0.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
;(03--67Q
'~3 ·-D9/-
~1ECE'VED
J 'u 1 o. '1 I.'~" '~, 7~
L-- ; """,',,,.I ;..' ".
William T. Allen
Survey Manager
A1~~!l c:~~ & {3'~~~~ <!,~::-(â.. ,,.:,~~··~'~rl~~~~~·l
D ~ ;l,J).:~~~w~,-
~..~
Attachment(s)
~;
oC
i
rO
~
DEFNIT VE
Slerry-Sun DrillinJ Services
~
Western North Slope
ConocoPhillips
Kuparuk 38 Pad
3S-24 Gyro
Job No. AKFO0002449740, Surveyed: 5 June, 2003
Survey Report
24 June, 2003
t'~
Your Ref: API 501032045600
Surface Coordinates: 5993851.58 N, 475993.50 E (70023' 39.5895" N, 150011'43.1639" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 993851.58 N, 24006.50 W (Grid)
Kelly Bushing: 56.0Bft above Mean Sea Level
Elevation relative to Project V Reference: 56.08ft
E/evation relative to Project V Reference: 56.08ft
sr--,..,....y-sul!
tJAILLING seì=tvlc:es
A Halliburton Company
Survey Ref: 5vy2046
Orif/Qllest 3.03.02.005
Page 2 0'2
----------------
24 June, 2003 - 17:09
361.67 Tolerable Gyro
362.00
0.00
0.00
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
From
Measured Vertical
Depth Depth
(ft) (ft)
-..
Survey tool program for 35-24 Gvro
Based upon Minimum Curvature type ca'culations, at a Measured Depth of 362.00ft.,
The Bottom Hole Displacement is 10.12ft., in the Direction of 224.013° (True).
Magnetic Declination at Surface is 25.092°(18-May-03)
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2565' FNL, 1266' FEL and calculated along an Azimuth of 40.000° (True).
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 55.8' M.S.L.. Northings and Eastings are relative to 2565' FNL, 1266' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
ConocoPhi/flps
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (0/100ft)
0.00 N O.OOE 5993851.58 N 475993.50 E 0.00 Tolerable Gyro
0.28 N 0.21 W 5993851.86 N 475993.30 E 0.506 0.08
0.53N 1.20W 5993852.11 N 475992.30 E 0.938 -0.37
1.378 3.61 W 5993850.22 N 475989.89 E 2.759 -3.37
7.288 7.03W 5993844.33 N 475986.45 E 2.926 -10.09
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 3S-24 Gyro
Your Ref: API 501032045600
Job No. AKFOO00244974O, Surveyed: 5 June, 2003
Western North Slope
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
0.00 0.000 0.000 -56.08 0.00
89.00 0.450 324.000 32.92 89.00
179.00 1.000 267.000 122.91 178.99
270.00 3.100 221.000 213.85 269.93
362.00 5.500 204.000 305.59 361.67
.:---
)
AOGCC
Lori Taylor
3016 Porcupine Drive
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well 3S-24
Dear Lori Taylor
Enclosed are two survey hard copies and one disk
Tie-on Survey:
Window I Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
13,656.00' MD
')
30-Jun-03
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~()3 -b·'7 c¡
RECE\VED
JUL 0 1 L003
Alaeka a1 & Gas Cons. Commisek>n
g:~
DEFIN~T VE
Sperry-Sun Drilling Services
Western North Slope
ConocoPhillips
Kuparuk 38 Pad
38-24
Job No. AKMW0002449740, Surveyed: 5 June, 2003
Survey Report
24 June, 2003
Your Ref: API 501032045600
Surface Coordinates: 5993851.58 N, 475993.50 E (70° 23' 39.5895" N, 1500 11' 43.1639" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
-"
Surface Coordinates relative to Project H Reference: 993851.58 N, 24006.50 W (Grid)
Kelly Bushing: 56.08ft above Mean Sea Level
E/evation relative to Project V Reference: 56.08ft
Elevation relative to Project V Reference: 56.08ft
5~·····"V-SU"
DRILLING seAVlces
A Halliburton Company
SUlvey Ref: 5vy2047
Sperry-Sun Drilling Services
Survey Report for Kuparuk3SPad - 35-24
Your Ref: API5l11032045600
Job No. AKMW000244974Ø,Surveyed: 5 June, 2003
ConocoPhil/ips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
362.00 5.500 204.000 305.59 361.67 7.288 7.03W 5993844.33 N 475986.45 E -10.09 AK-6 BP _IFR-AK
477.77 9.250 209.990 420.38 476.46 20.41 8 13.94 W 5993831.22 N 475979.49 E 3.302 -24.60
567.02 12.270 212.910 508.06 564.14 34.59 8 22.68 W 5993817.07 N 475970.71 E 3.437 -41.07
657.30 17.340 210.010 595.31 651.39 54.30 8 34.63 W 5993797.39 N 475958.70 E 5.674 -63.86
749.96 22.300 209.460 682.46 738.54 81.59 8 50.19 W 5993770.16 N 475943.05 E 5.357 -94.76
839.33 24.960 210.420 764.32 820.40 112.628 68.08 W 5993739.18 N 475925.06 E 3.007 -130.03 -~.
936.33 27.900 210.730 851.18 907.26 149.788 90.05 W 5993702.09 N 475902.97 E 3.034 -172.62
1028.82 28.820 210.820 932.57 988.65 187.53 8 112.53 W 5993664.42 N 475880.37 E 0.996 -215.98
1119.43 30.630 212.370 1011.25 1067.33 225.788 136.08 W 5993626.24 N 475856.70 E 2.170 -260.43
1213.26 33.660 212.460 1090.69 1146.77 267.92 S 162.84 W 5993584.18 N 475829.80 E 3.230 -309.91
1310.35 35.730 216.630 1170.52 1226.60 313.39 S 194.20 W 5993538.82 N 475798.30 E 3.243 -364.90
1402.54 40.050 221.670 1243.28 1299.36 357.17 S 230.00 W 5993495.15 N 475762.35 E 5.762 -421.46
1495.03 45.820 221.150 1310.96 1367.04 404.41 8 271.65 W 5993448.04 N 475720.56 E 6.250 -484.41
1588.19 49.420 220.560 1373.75 1429.83 456.46 8 316.65 W 5993396.14 N 475675.39 E 3.893 -553.21
1684.74 52.440 219.440 1434.59 1490.67 513.898 364.81 W 5993338.87 N 475627.04 E 3.255 -628.16
1778.78 54.670 219.150 1490.45 1546.53 572.43 S 412.72 W 5993280.48 N 475578.95 E 2.384 -703.79
1872.94 58.800 220.450 1542.09 1598.17 632.89 8 463.12 W 5993220.18 N 475528.35 E 4.535 -782.50
1968.35 65.070 220.070 1586.96 1643.04 697.11 S 517.49 W .5993156.14 N 475473.77 E 6.581 -866.65
2062.51 65.640 222.310 1626.23 1682.31 761.50 8 573.85 W 5993091.92 N 475417.21 E 2.245 -952.21
2157.21 63.070 221.540 1667.21 1723.29 825.01 8 630.89 W 5993028.60 N 475359.96 E 2.811 -1037.52
2251.08 65.490 224.390 1707.95 1764.03 886.87 8 688.53 W 5992966.93 N 475302.12 E 3.758 -1121.96
2345.14 66.280 224.010 1746.38 1802.46 948.42 S 748.38 W 5992905.57 N 475242.07 E 0.917 -1207.58
2439.04 65.680 225.250 1784.60 1840.68 1009.45 8 808.63 W 5992844.73 N 475181.63 E 1.365 -1293.07
2534.64 67.560 223.020 1822.54 1878.62 1 072.43 8 869.72 W 5992781.94 N 475120.34 E 2.907 -1380.58 _.
2629.01 68.300 221.750 1858.00 1914.08 1137.038 928.67 W 5992717.54 N 475061.18 E 1.473 -1467.96
2722.40 68.01 0 222.910 1892.75 1948.83 1201.118 987.05 W 5992653.64 N 475002.60 E 1.194 -1554.57
2815.13 67.890 221.340 1927.57 1983.65 1264.86 8 1044.69 W 5992590.09 N 474944.75 E 1.575 -1640.45
2909.30 68.230 220.880 1962.75 2018.83 1330.67 8 1102.12 W 5992524.46 N 474887.11 E 0.579 -1727.78
3005.03 68.380 219.220 1998.14 2054.22 1398.768 1159.36 W 5992456.55 N 474829.66 E 1.619 -1816.73
3099.52 68.050 219.290 2033.21 2089.29 1466.708 1214.88 W 5992388.79 N 474773.92 E 0.356 -1904.46
3194.44 68.030 219.450 2068.71 2124.79 1534.758 1270.72 W 5992320.92 N 474717.86 E 0.158 -1992.49
3288.22 67.890 221.000 2103.90 2159.98 1601.128 1326.85 W 5992254.73 N 474661.51 E 1.539 -2079.41
3382.90 67.320 221.110 2139.97 2196.05 1667.138 1384.35 W 5992188.90 N 474603.81 E 0.612 -2166.94
3476.41 69.170 216.920 2174.64 2230.72 1734.60 8 1438.99 W 5992121.61 N 474548.95 E 4.608 -2253.75
3570.00 69.040 216.290 2208.02 2264.10 1804.798 1491.12 W 5992051.59 N 474496.59 E 0.644 -2341.03
24 June, 2003 - 17:09 Page 2 0(6 Dri/lQuest 3.03.02.005
Sperry-Sun Drilling.Services
Survey Report for Kupsruk3SPBd - 3S-24
Your Ref: API 501032"45600
Job No. AKMW0002449740, Surveyed: 5 June, 2003
ConocoPhillips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3664.37 69.350 217.500 2241.54 2297.62 1875.34 S 1544.08 W 5991981.21 N 474443.40 E 1.243 -2429.11
3758.32 69.490 216.910 2274.57 2330.65 1945.39 S 1597.27 W 5991911.33 N 474389.99 E 0.607 -2516.96
3853.08 69.840 215.950 2307.50 2363.58 2016.88 S 1650.03 W 5991840.01 N 474337.00 E 1.019 -2605.64
3943.73 68.900 218.630 2339.44 2395.52 2084.37 S 1701.42 W 5991772.68 N 474285.40 E 2.955 -2690.37
4037.20 69.620 218.330 2372.54 2428.62 2152.80 S 1755.81 W 5991704.43 N 474230.79 E 0.827 -2777.75
'-
4128.79 68.060 217.660 2405.60 2461.68 2220.11 S 1808.39 W 5991637.29 N 474177.99 E 1.835 -2863.11 ~
4223.81 67.020 218.850 2441.90 2497.98 2289.07 S 1862.75 W 5991568.51 N 474123.40 E 1.593 -2950.88
4317.87 66.940 217.290 2478.69 2534.77 2357.22 S 1916.13 W 5991500.53 N 474069.81 E 1.529 -3037.40
4412.76 68.310 219.170 2514.81 2570.89 2426.13 S 1970.43 W 5991431.79 N 474015.28 E 2.333 -3125.10
4469.4 7 68.140 218.070 2535.85 2591.93 2467.28 S 2003.30 W 5991390.75 N 473982.28 E 1.826 -3177.74
4568.79 69.170 219.220 2572.00 2628.08 2539.52 S 2061.07 W 5991318.69 N 473924.28 E 1 .496 -3270.22
4664.04 68.550 217.470 2606.36 2662.44 2609.20 S 2116.19 W 5991249.19 N 473868.94 E 1.833 -3359.02
4760.47 68.700 216.900 2641.50 2697.58 2680.74 S 2170.46 W 5991177.83 N 473814.44 E 0.572 -3448.71
4854.00 68.230 216.220 2675.83 2731.91 2750.62 S 2222.29 W 5991108.11 N 473762.39 E 0.843 -3535.55
4949.95 68.040 219.430 2711.58 2767.66 2820.94 S 2276.88 W 5991037.96 N 473707.57 E 3.111 -3624.52
5044.70 68.040 220.850 2747.01 2803.09 2888.12 S 2333.53 W 5990970.97 N 473650.71 E 1.390 -3712.39
5140.82 67.710 219.200 2783.21 2839.29 2956.30 S 2390.79 W 5990902.97 N 473593.22 E 1.627 -3801.43
5234.14 67.560 220.290 2818.72 2874.80 3022.66 S 2445.97 W . 5990836.80 N 473537.83 E 1.092 -3887.73
5328.58 67.170 219.120 2855.07 2911.15 3089.71 S 2501.66 W 5990769.92 N 473481.94 E 1.216 -3974.89
5420.98 66.680 219.370 2891.29 2947.37 3155.55 S 2555.43 W 5990704.26 N 473427.95 E 0.586 -4059.89
5515.59 67.480 222.540 2928.14 2984.22 3221.34 S 2612.55 W 5990638.64 N 473370.62 E 3.200 -4147.00
5614.56 67.460 222.400 2966.06 3022.14 3288.77 S 2674.27 W 5990571.41 N 473308.68 E 0.132 -4238.34
5709.77 66.890 220.790 3003.00 3059.08 3354.40 S 2732.53 W 5990505.98 N 473250.21 E 1.670 -4326.05 --
5805.06 68.160 220.210 3039.42 3095.50 3421.35 S 2789.71 W 5990439.21 N 473192.82 E 1 .447 -4414.10
5899.52 68.180 220.280 3074.55 3130.63 3488.28 S 2846.36 W 5990372.46 N 473135.95 E 0.072 -4501.78
5993.37 68.110 219.260 3109.49 3165.57 3555.23 S 2902.08 W 5990305.69 N 473080.02 E 1.011 -4588.89
6087.23 67.750 218.600 3144.75 3200.83 3622.89 S 2956.74 W 5990238.20 N 473025.14 E 0.756 -4675.85
6183.24 67.760 219.650 3181.10 3237.18 3691.83 S 3012.81 W 5990169.44 N 472968.85 E 1.012 -4764.71
6277.48 67.590 218.250 3216.90 3272.98 3759.63 S 3067.61 W 5990101.83 N 472913.83 E 1.386 -4851.86
6372.66 67.300 219.130 3253.41 3309.49 3828.23 S 3122.56 W 5990033.39 N 472858.66 E 0.907 -4939.74
6467.29 67.230 218.880 3289.98 3346.06 3896.06 S 3177.49 W 5989965.75 N 472803.51 E 0.255 -5027.00
6562.21 67.350 218.760 3326.63 3382.71 3964.28 S 3232.38 W 5989897.70 N 472748.41 E 0.172 -5114.55
6656.83 67.590 218.540 3362.88 3418.96 4032.53 S 3286.97 W 5989829.62 N 472693.60 E 0.332 -5201.92
6750.81 68.240 217.940 3398.22 3454.30 4100.93 S 3340.87 W 5989761.40 N 472639.48 E 0.910 -5288.96
6846.62 67.690 221.650 3434.17 3490.25 4169.16 S 3397.69 W 5989693.36 N 472582.44 E 3.635 -5377.75
24 June, 2003 - 17:09 Page 3 of6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
SUlvey Report for Kuparuk 3S Pad - 35-24
Your Ref: AP/501032045600
Job No. AKMWOO02449740, Surveyed: 5 June, 2003
ConocoPhil/íps
Western North Slope
Measured Sub-Sea Vertical Loca' Coordinates Globa' Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northings Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6941 .20 67.640 221.870 3470.11 3526.19 4234.41 S 3455.96 W 5989628.29 N 472523.96 E 0.222 -5465.20
7034.78 67.880 221.370 3505.53 3561.61 4299.17 8 3513.49 W 5989563.72 N 472466.22 E 0.557 -5551.78
7131.49 67.500 220.500 3542.25 3598.33 4366.76 8 3572.11 W 5989496.32 N 472407.39 E 0.920 -5641.24
7226.42 67.770 220.890 3578.37 3634.45 4433.328 3629.35 W 5989429.94 N 472349.93 E 0.475 -5729.02
7320.15 67.900 221.130 3613.73 3669.81 4498.82 8 3686.31 W 5989364.62 N 472292.76 E 0.275 -5815.81
7414.03 67.430 220.570 3649.41 3705.49 4564.50 8 3743.11 W 5989299.12 N 472235.75 E 0.745 -5902.64 .~
7508.75 67.440 220.720 3685.75 3741.83 4630.87 8 3800.08 W 5989232.94 N 472178.57 E 0.147 -5990.10
7603.41 67.980 219.970 3721.66 3777.74 4697.63 8 3856.78 W 5989166.36 N 472121.65 E 0.929 -6077.68
7697.4 7 68.160 220.000 3756.79 3812.87 4764.48 8 3912.85 W 5989099.69 N 472065.37 E 0.194 -6164.94
7790.33 68.370 219.330 3791.17 3847.25 4830.888 3967.91 W 5989033.47 N 472010.10 E 0.707 -6251.19
7885.86 68.580 219.710 3826.22 3882.30 4899.43 S 4024.46 W 5988965.10 N 471953.33 E 0.430 -6340.06
7980.15 69.140 220.750 3860.23 3916.31 4966.57 S 4081.26 W 5988898.14 N 471896.31 E 1.188 -6428.00
8071.64 69.240 220.730 3892.73 3948.81 5031.378 4137.07 W 5988833.52 N 471840.29 E 0.111 -6513.51
8166.60 68.840 220.870 3926.70 3982.78 5098.50 8 4195.02 W 5988766.58 N 471782.13 E 0.443 -6602.18
8260.58 68.440 222.130 3960.93 4017.01 5164.058 4253.01 W 5988701.21 N 471723.93 E 1.319 -6689.67
8355.91 68.020 221.760 3996.29 4052.37 5229.90 S 4312.18 W 5988635.56 N 471664.54 E 0.569 -6778.15
8450.96 67.900 220.980 4031.96 4088.04 5296.028 4370.41 W 5988569.63 N 471606.10 E 0.771 -6866.23
8545.96 68.540 221.890 4067.21 4123.29 5362.15 S 4428.79 W 5988503.68 N 471547.51 E 1.116 -6954.42
8641 .17 69.030 220.970 4101.66 4157.74 5428.70 8 4487.52 W 5988437.32 N 471488.57 E 1.037 -7043.15
8736.43 69.080 220.950 4135.72 4191.80 5495.88 8 4545.84 W 5988370.33 N 471430.03 E 0.056 -7132.10
8831.57 68.960 219.720 4169.78 4225.86 5563.59 8 4603.34 W . 5988302.80 N 471372.32 E 1.214 -7220.93
8922.03 68.690 218.890 4202.46 4258.54 5628.86 8 4656.77 W 5988237.70 N 471318.68 E 0.906 -7305.28
9018.43 68.530 219.260 4237.62 4293.70 5698.55 8 4713.35 W 5988168.20 N 471261.87 E 0.394 -7395.02 -.
9113.15 68.170 217.510 4272.56 4328.64 5767.55 8 4768.02 W 5988099.37 N 471206.99 E 1.759 -7483.02
9207.62 68.030 218.530 4307.80 4363.88 5836.60 S 4822.00 W 5988030.49 N 471152.78 E 1.013 -7570.62
9302.00 67.840 217.160 4343.26 4399.34 5905.678 4875.67 W 5987961.60 N 471098.89 E 1.360 -7658.02
9395.29 67.830 220.420 4378.46 4434.54 5973.00 8 4929.78 W 5987894.44 N 471044.56 E 3.236 -7744.39
9490.04 67.850 219.930 4414.20 4470.28 6040.05 8 4986.39 W 5987827.58 N 470987.74 E 0.479 -7832.14
9579.50 67.700 218.620 4448.04 4504.12 6104.158 5038.81 W 5987763.64 N 470935.11 E 1.366 -7914.94
9673.31 68.110 219.770 4483.33 4539.41 6171.51 8 5093.74 W 5987696.45 N 470879.96 E 1.217 -8001.85
9765.94 67.620 220.220 4518.23 4574.31 6237.258 5148.89 W 5987630.90 N 470824.60 E 0.694 -8087.65
9860.67 67.430 219.770 4554.44 4610.52 6304.31 8 5205.15 W 5987564.02 N 470768.13 E 0.483 -8175.19
9954.31 68.840 222.100 4589.32 4645.40 6369.95 8 5262.09 W 5987498.56 N . 470710.98 E 2.757 -8262.07
10050.41 68.620 221.690 4624.18 4680.26 6436.61 8 5321.89 W 5987432.10 N 470650.96 E 0.459 -8351.57
10143.31 68.170 220.830 4658.39 4714.47 6501.548 5378.85 W 5987367.35 N 470593.79 E 0.988 -8437.93
24 June, 2003 - 17:09 Page 4 of6 DrillQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 35 Pad - 35-24
Your Ref: API 501032045600
Job No. AKMW0002449740, Surveyed: 5 June, 2003
ConocoPhi/fips
Western North Slope
Measured Sub-Sea Vertica' Loca' Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10236.33 67.610 221.090 4693.40 4749.48 6566.62 S 5435.35 W 5987302.45 N 470537.09 E 0.655 -8524.09
10330.65 67.180 220.690 4729.65 4785.73 6632.44 S 5492.35 W 5987236.81 N 470479.88 E 0.601 -8611 . 1 6
10426.35 66.550 220.310 4767.25 4823.33 6699.36 S 5549.50 W 5987170.08 N 470422.51 E 0.753 -8699.16
10520.01 66.150 221.040 4804.82 4860.90 6764.43 S 5605.42 W 5987105.19 N 470366.39 E 0.832 -8784.94
10615.51 67.230 221.660 4842.61 4898.69 6830.26 S 5663.36 W 5987039.54 N 470308.23 E 1.278 -8872.62
10710.22 66.710 222.160 4879.67 4935.75 6895.13 S 5721.58 W 5986974.86 N 470249.81 E 0.733 -8959.73 ;,~;
10803.39 68.760 221.600 4914.97 4971.05 6959.32 S 5779.13 W 5986910.85 N 470192.05 E 2.269 -9045.91
10898.34 68.170 221.720 4949.82 5005.90 7025.31 S 5837.84 W 5986845.06 N 470133.13 E 0.632 -9134.19
10991.91 67.750 221.410 4984.93 5041.01 7090.20 S 5895.39 W 5986780.35 N 470075.37 E 0.544 -9220.89
11086.19 67.480 221.170 5020.84 5076.92 7155.70 S 5952.91 W 5986715.03 N 470017.64 E 0.371 -9308.04
11180.94 68.730 222.080 5056.17 5112.25 7221.42 S 6011.31 W 5986649.51 N 469959.03 E 1.592 -9395.92
11275.40 68.4 70 220.270 5090.64 5146.72 7287.61 S 6069.21 W 5986583.50 N 469900.92 E 1.805 -9483.84
11369.25 67.860 222.100 5125.55 5181.63 7353.17 S 6126.57 W 5986518.12 N 469843.35 E 1.923 -9570.94
11462.83 67.390 221.970 5161.17 5217.25 7417.44 S 6184.51 W 5986454.04 N 469785.20 E 0.518 -9657.42
11556.70 68.700 220.960 5196.26 5252.34 7482.68 S 6242.16 W 5986388.98 N 469727.35 E 1.716 -9744.45
11650.82 68.500 220.620 5230.61 5286.69 7549.03 S 6299.40 W 5986322.82 N 469669.89 E 0.398 -9832.07
11746.56 68.510 220.760 5265.69 5321.77 7616.58 S 6357.48 W 5986255.46 N 469611.59 E 0.136 -9921.15
11839.51 68.370 220.760 5299.84 5355.92 7682.05 S 6413.92 W . 5986190.16 N 469554.94 E 0.151 -10007.58
11935.13 68.170 219.850 5335.25 5391.33 7749.79 S 6471.38 W 5986122.61 N 469497.27 E 0.908 -1 0096.41
12028.49 67.810 219.850 5370.24 5426.32 7816.24 S 6526.84 W 5986056.34 N 469441.59 E 0.386 -10182.96
12133.76 67.560 219.740 5410.21 5466.29 7891.07 S 6589.17 W 5985981.71 N 469379.02 E 0.256 -10280.35
12226.21 66.820 219.520 5446.05 5502.13 7956.70 S 6643.53 W 5985916.25 N 469324.45 E 0.830 -10365.57
12319.36 66.270 218.800 5483.12 5539.20 8022.96 S 6697.49 W 5985850.17 N 469270.28 E 0.923 -10451.01
12413.18 67.560 219.550 5519.91 5575.99 8089.86 S 6752.01 W 5985783.44 N 469215.54 E 1.559 -10537.30
12507.64 66.950 219.730 5556.43 5612.51 8156.95 S 6807.59 W 5985716.54 N 469159.75 E 0.669 -10624.42
12600.69 66.700 219.220 5593.05 5649.13 8222.98 S 6861.97 W 5985650.68 N 469105.16 E 0.571 -10709.95
12692.25 66.450 219.060 5629.45 5685.53 8288.14 S 6915.00 W 5985585.69 N 469051.92 E 0.317 -10793.96
12785.71 66.300 218.500 5666.90 5722.98 8354.89 S 6968.63 W 5985519.11 N 468998.07 E 0.572 -10879.57
12878.67 66.280 217.850 5704.28 5760.36 8421.80 S 7021.24 W 5985452.37 N 468945.25 E 0.641 -10964.64
12970.17 65.810 217.730 5741.43 5797.51 8487.88 S 7072.48 W 5985386.46 N 468893.80 E 0.527 -11048.19
13068.85 65.420 218.660 5782.18 5838.26 8558.51 S 7128.05 W 5985316.00 N 468838.00 E 0.945 -11138.02
13164.06 65.980 219.050 5821.36 5877.44 8626.09 S 7182.49 W 5985248.60 N 468783.35 E 0.697 -11224.78
13257.79 66.630 217.820 5859.02 5915.10 8693.32 S 7235.84 W 5985181.55 N 468729.78 E 1.387 -11310.57
13323.65 67.490 216.850 5884.70 5940.78 8741.54 S 7272.62 W 5985133.44 N 468692.85 E 1.883 -11371.16
13415.82 67.500 216.130 5919.97 5976.05 8810.00 S 7323.25 W 5985065.15 N 468641.99 E 0.722 -11456.15
24 June, 2003 - 17:09
Page 5 of6
Dril/Quest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 38 Pad - 3S-24
Your Ref: API 501032045600
Job No. AKMW0002449740, Surveyed: 5 June, 2003
Western North Slope
Measured Sub-Sea Vertica'
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
13508.94 67.430 215.880 5955.66 6011.74
13589.45 67.420 216.680 5986.57 6042.65
13656.00 67.420 216.680 6012.12 6068.20
Local Coordinates
Northings Eastings
(ft) (ft)
8879.58 S
8939.51 S
8988.79 S
7373.82 W
7417.81 W
7454.51 W
Global Coordinates
Northings Eastings
(ft) (ft)
5984995.73 N
5984935.94 N
5984886.78 N
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 55.8' M.S.L.. Northings and Eastings are relative to 2565' FNL, 1266' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2565' FNL, 1266' FEL and calculated along an Azimuth of 40.000° (True).
Magnetic Declination at Surface is 25.092°(18-May-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 13656.000.,
The Bottom Hole Displacement is 11677.67ft., in the Direction of 219.669° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
~) ~) ~)
Comment
13656.00
6068.20
8988.79 S
7454.51 W Projected Survey
Survey toolproQram for 35-24
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
362.00
0.00
361.67
362.00
13656.00
361.67 Tolerable Gyro (3S-24 Gyro)
6068.20 AK-6 BP _IFR-AK (3S-24)
24 June, 2003 - 17:09
Page 60f6
468591.21 E
46854 7 .02 E
468510.16 E
Dogleg Vertical
Rate Section
(0/100ft)
ConocoPhillips
Comment
0.259 -11541.95
0.918 -11616.13
0.000 -11677.48 Projected Survey
.~.
---'
DrillQuest 3.03.02.005
')
AOGCC
Lori Taylor
3016 Porcupine Drive
Anchorage, AK 99501
)
30-Jun-03
Re: Distribution of Survey Data for Well 3S-24 MWD
Dear Lori Taylor
Enclosed are two survey hard copies and one disk
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
13,656.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
d..D 3 --61 q
RECEIVED
JUl 0 1 2003
Ala8ka OIi & Gas Cons. Comm' .
Û ~ Andt~ I8IIOn
~~
\J
~
~
\
r<\
C;:)
~
Sperry-Sun Drilling Services
,,-
Western North Slope
ConocoPhillips
Kuparuk3S Pad
3S-24 MWD
Job No. AKMW0002449740, Surveyed: 5 June, 2003
Survey Report
24 June, 2003
,~.
Your Ref: API 501032045600
Surface Coordinates: 5993851.58 N, 475993.50 E (70023' 39.5895" N, 150011'43.1639" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 993851.58 N, 24006.50 W (Grid)
Kelly Bushing: 56.08ft above Mean Sea Level
Elevation relative to Project V Reference: 56.08ft
Elevation relative to Project V Reference: 56.08ft
5pe!!1'r'Y-SUr,
DRILLING SEFtVu::es
A Halliburton Company
Survey Ref: svy2048
Sperry-Sun Drilling Services
Survey Report for Kuparuk 35 Pad - 35-24 MWD
Your Ref: API 501032045600
Job No. AKMWOO0244974O, Surveyed: 5 June, 2003
ConocoPhi/fips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
362.00 5.500 204.000 305.59 361.67 7.288 7.03W 5993844.33 N 475986.45 E -10.09 MWD Magnetic
477.77 9.250 210.200 420.38 476.46 20.39 8 13.97 W 5993831.23 N 475979.46 E 3.307 -24.60
567.02 12.270 213.040 508.06 564.14 34.55 8 22.75 W 5993817.11 N 475970.64 E 3.434 -41.09
657.30 17.340 209.600 595.31 651.39 54.30 8 34.64 W 5993797.39 N 475958.69 E 5.697 -63.86
749.96 22.300 208.870 682.46 738.54 81.728 49.95 W 5993770.02 N 475943.28 E 5.359 - 94.71
.~
839.33 24.960 209.480 764.33 820.41 112.998 67.42 W 5993738.81 N 475925.71 E 2.989 -129.89
936.33 27.900 210.760 851.18 907.26 150.31 8 89.11 W 5993701.55 N 475903.91 E 3.087 -172.42
1028.82 28.820 211.210 932.57 988.65 187.988 111.73 W 5993663.96 N 475881.17E 1.021 -215.81
1119.43 30.630 212.390 1011.25 1 067.33 226.158 135.41 W 5993625.87 N 475857.36 E 2.099 -260.28
1213.26 33.660 212.780 1090.69 1146.77 268.21 8 162.30 W 5993583.90 N 475830.34 E 3.237 -309.78
1310.35 35.730 217.160 1170.52 1226.60 313.43 8 194.00 W 5993538.77 N 475798.50 E 3.336 -364.80
1402.54 40.050 222.150 1243.28 1299.36 356.91 8 230.19 W 5993495.42 N 475762.17 E 5.742 -421.37
1495.03 45.820 221.930 1310.96 1367.04 403.68 S 272.35 W 5993448.78 N 475719.85 E 6.241 -484.30
1588.19 49.420 221.250 1373.75 1429.83 455.158 318.02 W 5993397.46 N 475674.02 E 3.902 -553.08
1684.74 52.440 220.020 1434.60 1490.68 512.038 366.81 W 5993340.73 N 475625.04 E 3.280 -628.02
1778.78 54.670 220.120 1490.46 1546.54 569.92 8 415.51 W 5993283.00 N 475576.16 E 2.373 -703.67
1872.94 58.800 220.920 1542.09 1598.17 629.75 8 466.66 W 5993223.33 N 475524.82 E 4.443 -782.38
1968.35 65.070 220.720 1586.96 1643.04 693.43 S 521.66 W 5993159.83 N 475469.61 E 6.574 -866.52
2062.51 65.640 222.890 1626.23 1682.31 757.228 578.71 W 5993096.22 N 475412.36 E 2.180 -952.05
2157.21 63.070 222.080 1667.21 1723.29 820.178 636.37 W 5993033.46 N 475354.50 E 2.821 -1037.33
2251.08 65.490 225.200 1707.95 1764.03 881.34 8 694.74 W 5992972.48 N 475295.94 E 3.951 -1121.71
- 2345.14 66.280 225.120 1746.38 1802.46 941.878 755.61 W 5992912.14 N 475234.87 E 0.843 -1207.21
2439.04 65.680 226.070 1784.61 1840.69 1001.898 816.88 W 5992852.32 N 475173.41 E 1.123 -1292.57
2534.64 67.560 223.900 1822.54 1878.62 1063.958 878.90 W 5992790.45 N 475111.19 E 2.865 -1379.98
2629.01 68.300 223.030 1858.00 1914.08 1127.43 S 939.06 W 5992727.17 N 475050.83 E 1.160 -1467.27
2722.40 68.010 223.380 1892.75 1948.83 1190.61 S 998.40 W 5992664.18 N 474991.28 E 0.466 -1553.82
2815.13 67.890 222.240 1927.57 1983.65 1253.66 S 1056.81 W 5992601.32 N 474932.67 E 1.147 -1639.66
2909.30 68.230 221.390 1962.75 2018.83 1318.768 1115.05 W 5992536.40 N 474874.23 E 0.912 -1726.97
3005.03 68.380 219.570 1998.14 2054.22 1386.42 8 1172.79 W 5992468.93 N 474816.27 E 1.773 -1815.91
3099.52 68.050 219.840 2033.21 2089.29 1453.928 1228.84 W 5992401.61 N 474760.00 E 0.439 -1903.65
3194.44 68.030 219.720 2068.71 2124.79 1521.588 1285.16 W 5992334.14 N 474703.46 E 0.119 -1991.68
3288.22 67.890 220.820 2103.90 2159.98 1587.908 1341.35 W 5992267.99 N 474647.06 E 1.097 -2078.61
3382.90 67.320 220.250 2139.97 2196.05 1654.438 1398.25 W 5992201.65 N 474589.95 E 0.820 -2166.14
3476.41 69.170 217.060 2174.64 2230.72 1722.25 S 1452.47 W 5992134.00 N 474535.51 E 3.735 -2252.95
3570.00 69.040 216.270 2208.02 2264.10 1792.38 S 1504.68 W 5992064.04 N 474483.07 E 0.801 -2340.24
"_.____0_ ___.._ __ _"_______..._ "_ .__ __________
24 June, 2003 - 17:09 Page 2 of6 DriflQup.st 3.0.1.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 38 Pad - 3S-24 MWD
Your Ref: API 501032045600
Job No. AKMW0002449740, Surveyed: 5 June, 2003
ConocoPhif/ips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates G'obal Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3664.37 69.350 217.710 2241.54 2297.62 1862.84 S 1557.76 W 5991993.75 N 474429.77 E 1.464 -2428.33
3758.32 69.490 217.010 2274.56 2330.64 1932.75 S 1611.13 W 5991924.01 N 474376.17 E 0.713 -2516.19
3853.08 69.840 216.100 2307.49 2363.57 2004.13 S 1664.05 W 5991852.81 N 474323.02 E 0.973 -2604.88
3943.73 68.900 219.240 2339.44 2395.52 2071.27 S 1715.88 W 5991785.83 N 474270.98 E 3.403 -2689.63
4037.20 69.620 219.030 2372.54 2428.62 2139.07 S 1771.05 W 5991718.20 N 474215.59 E 0.798 -2777.04
~
4128.79 68.060 218.230 2405.60 2461.68 2205.80 S 1824.37 W 5991651.65 N 474162.05 E 1.888 -2862.42
4223.81 67.020 219.290 2441.90 2497.98 2274.27 S 1879.35 W 5991583.36 N 474106.86 E 1.504 -2950.21
4317.87 66.940 217.990 2478.68 2534.76 2341.89 S 1933.40 W 5991515.92 N 474052.59 E 1.275 -3036.75
4412.76 68.310 220.390 2514.81 2570.89 2409.88 S 1988.85 W 5991448.10 N 473996.92 E 2.748 -3124.48
4469.47 68.140 218.800 2535.85 2591.93 2450.46 S 2022.41 W 5991407.63 N 473963.23 E 2.621 -3177.14
4568.79 69.170 219.030 2572.00 2628.08 2522.43 S 2080.52 W 5991335.84 N 473904.89 E 1.059 -3269.63
4664.04 68.550 217.930 2606.35 2662.43 2591.98 S 2135.80 W 5991266.47 N 473849.39 E 1.259 -3358.44
4760.47 68.700 217.610 2641.50 2697.58 2662.96 S 2190.80 W 5991195.67 N 473794.16 E 0.346 -3448.17
4854.00 68.230 216.850 2675.83 2731.91 2732.23 S 2243.44 W 5991126.57 N 473741.30 E 0.908 -3535.06
4949.95 68.040 220.090 2711.57 2767.65 2801.94 S 2298.82 W 5991057.04 N 473685.69 E 3.140 -3624.06
5044.70 68.040 221.320 2747.00 2803.08 2868.55 S 2356.13 W 5990990.61 N 473628.17 E 1.204 -3711.93
5140.82 67.710 219.670 2783.21 2839.29 2936.26 S 2413.95 W 5990923.09 N 473570.13 E 1.627 -3800.97
5234.14 67.560 220.770 2818.72 2874.80 3002.16 S 2469.68 W 5990857.37 N 473514.19 E 1.102 -3887.26
5328.58 67.170 220.030 2855.06 2911.14 3068.54 S 2526.17 W 5990791.17 N 473457.49 E 0.833 -3974.43
5420.98 66.680 220.200 2891.28 2947.36 3133.55 S 2580.94 W 5990726.34 N 473402.51 E 0.557 -4059.43
5515.59 67.480 223.550 2928.13 2984.21 3198.41 S 2639.10 W 5990661.66 N 473344.14 E 3.369 -4146.51
5614.56 67.460 223.000 2966.06 3022.14 3264.97 S 2701.77 W 5990595.30 N 473281.26 E 0.514 -4237.78
;~. 5709.77 66.890 221.320 3002.99 3059.07 3330.02 S 2760.67 W 5990530.45 N 473222.15 E 1.733 -4325.46
5805.06 68.160 221.160 3039.42 3095.50 3396.23 S 2818.71 W 5990464.42 N 473163.89 E 1.342 -4413.49
5899.52 68.180 221.980 3074.54 3130.62 3461.83 S 2876.90 W 5990399.01 N 473105.50 E 0.806 -4501.15
5993.37 68.110 220.350 3109.48 3165.56 3527.40 S 2934.23 W 5990333.62 N 473047.96 E 1.614 -4588.23
6087.23 67.750 219.850 3144.75 3200.83 3593.93 S 2990.26 W 5990267.27 N 472991.72 E 0.625 -4675.21
6183.24 67.760 220.300 3181.10 3237.18 3661.93 S 3047.47 W 5990199.45 N 472934.29 E 0.434 -4764.08
6277 .48 67.590 219.100 3216.89 3272.97 3729.00 S 3103.15 W 5990132.56 N 472878.39 E 1.192 -4851.25
6372.66 67.300 220.420 3253.40 3309.48 3796.57 S 3159.37 W 5990065.17 N 472821.96 E 1.317 -4939.15
6467.29 67.230 220.130 3289.98 3346.06 3863.16 S 3215.79 W 5989998.77 N 472765.32 E 0.292 -5026.42
6562.21 67.350 219.380 3326.62 3382.70 3930.48 S 3271.78 W 5989931.63 N 472709.11 E 0.740 -5113.98
6656.83 67.590 219.120 3362.88 3418.96 3998.16 S 3327.08 W 5989864.13 N 472653.60 E 0.359 -5201.37
6750.81 68.240 218.240 3398.21 3454.29 4066.14 S 3381.50 W 5989796.32 N 472598.96 E 1.110 -5288.43
6846.62 67.690 222.010 3434.17 3490.25 4134.04 S 3438.72 W 5989728.61 N 472541.52 E 3.692 -5377.22
----------_.- -------..-.----.----- --.-
24 June, 2003 - 17:09 Page 3 0'6 DrilfQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 38-24 MWD
Your Ref: AP/501032045600
Job No. AKMWOO02449740, Surveyed: 5 June, 2003
ConocoPhiflips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft} (ft) (ft) (0/100ft)
6941.20 67.640 220.940 3470.11 3526.19 4199.58 S 3496.66 W 5989663.25 N 472483.37 E 1.048 -5464.68
7034.78 67.880 219.720 3505.53 3561.61 4265.61 S 3552.72 W 5989597.40 N 472427.10 E 1.234 -5551.29
7131.49 67.500 219.330 3542.24 3598.32 4334.62 S 3609.66 W 5989528.57 N 472369.94 E 0.542 -5640.76
7226.42 67.770 220.650 3578.37 3634.45 4401.88 S 3666.07 W 5989461.49 N 472313.31 E 1.317 -5728.54
,,- 7320.15 67.900 220.820 3613.73 3669.81 4467.66 S 3722.72 W 5989395.90 N 472256.45 E 0.218 -5815.34
7414.03 67.430 220.870 3649.41 3705.49 4533.35 S 3779.51 W 5989330.39 N 472199.45 E 0.503 -5902.17
7508.75 67.440 221.250 3685.75 3741.83 4599.30 S 3836.96 W 5989264.63 N 472141.78 E 0.371 -5989.62
7603.41 67.980 221.150 3721.66 3777.74 4665.20 S 3894.66 W 5989198.91 N 472083.88 E 0.579 -6077.19
7697.47 68.160 220.580 3756.79 3812.87 4731.19 S 3951.74 W 5989133.11 N 472026.58 E 0.594 -6164.43
7790.33 68.370 219.780 3791.17 3847.25 4797.09 S 4007.40 W 5989067.38 N 471970.72 E 0.832 -6250.69
7885.86 68.580 219.910 3826.22 3882.30 4865.32 S 4064.34 W 5988999.34 N 471913.56 E 0.254 -6339.56
7980.15 69.140 220.630 3860.23 3916.31 4932.42 S 4121.18W 5988932.42 N 471856.50 E 0.927 -6427.50
8071.64 69.240 221.280 3892.73 3948.81 4997.01 S 4177.24 W 5988868.01 N 471800.24 E 0.673 -6513.01
8166.60 68.840 221.710 3926.70 3982.78 5063.43 S 4235.99 W 5988801.78 N 471741.27 E 0.597 -6601.65
8260.58 68.440 222.570 3960.93 4017.01 5128.33 S 4294.71 W 5988737.07 N 471682.34 E 0.953 -6689.12
8355.91 68.020 222.480 3996.29 4052.37 5193.57 S 4354.55 W 5988672.02 N 471622.29 E 0.449 -6777.56
8450.96 67.900 221.600 4031.96 4088.04 5259.01 S 4413.55 W 5988606.78 N 471563.08 E 0.867 -6865.61
8545.96 68.540 222.420 4067.21 4123.29 5324.55 S 4472.59 W . 5988541.42 N 471503.83 E 1.047 -6953.77
8641 .17 69.030 221.680 4101.66 4157.74 5390.46 S 4532.04 W 5988475.70 N 471444.17 E 0.889 -7042.47
8736.43 69.080 222.030 4135.71 4191.79 5456.72 S 4591.40 W 5988409.63 N 471384.60 E 0.347 -7131.39
8831.57 68.960 220.960 4169.78 4225.86 5523.26 S 4650.26 W 5988343.28 N 471325.53 E 1.058 -7220.19
r- 8922.03 68.690 220.070 4202.46 4258.54 5587.39 S 4705.05 W 5988279.33 N 471270.53 E 0.965 -7304.54
9018.43 68.530 220.260 4237.61 4293.69 5655.98 S 4762.95 W 5988210.92 N 471212.41 E 0.247 -7394.30
9113.15 68.170 218.990 4272.56 4328.64 5723.79 S 4819.10W 5988143.30 N 471156.05 E 1.303 -7482.33
9207.62 68.030 219.540 4307.80 4363.88 5791.65 S 4874.57 W 5988075.61 N 471100.35 E 0.560 -7569.98
9302.00 67.840 218.050 4343.25 4399.33 5859.82 S 4929.37 W 5988007.62 N 471045.34 E 1 .477 -7657.42
9395.29 67.830 220.980 4378.46 4434.54 5926.46 S 4984.34 W 5987941.16 N 470990.16 E 2.909 -7743.80
9490.04 67.850 220.4 70 4414.20 4470.28 5992.96 S 5041.59 W 5987874.84 N 470932.69 E 0.499 -7831.54
9579.50 67.700 218.950 4448.03 4504.11 6056.67 S 5094.50 W 5987811.30 N 470879.58 E 1.582 -7914.35
9673.31 68.110 220.010 4483.32 4539.40 6123.75 S 5149.76 W 5987744.40 N 470824.10 E 1.135 -8001.27
9765.94 67.620 220.190 4518.22 4574.30 6189.39 S 5205.03 W 5987678.94 N 470768.62 E 0.559 -8087.07
9860.67 67.430 219.950 4554.44 4610.52 6256.37 S 5261.38 W 5987612.14 N 470712.06 E 0.308 -8174.61
9954.31 68.840 222.170 4589.31 4645.39 6321.89 S 5318.46 W 5987546.80 N 470654.77 E 2.666 -8261.49
10050.41 68.620 221.490 4624.18 4680.26 6388.62 S 5378.18 W 5987480.27 N 470594.83 E 0.698 -8350.99
10143.31 68.170 220.980 4658.38 4714.46 6453.57 S 5435.12 W 5987415.50 N 470537.69 E 0.704 -8437.35
-------~----------------
24 June, 2003 - 17:09 Page 4 of6 DriflQuest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 3S-24 MWD
Your Ref: API 501032045600
Job No. AKMW0002449740, Surveyed: 5 June, 2003
ConocoPhif/ips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
10236.33 67.610 221.290 4693.39 4749.47 6518.48 S 5491.81 W 5987350.77 N 470480.79 E 0.677 -8523.51
10330.65 67.180 220.860 4729.65 4785.73 6584.12 S 5549.02 W 5987285.32 N 470423.36 E 0.620 -8610.57
10426.35 66.550 220.860 4767.25 4823.33 6650.67 S 5606.59 W 5987218.94 N 470365.58 E 0.658 -8698.56
10520.01 66.150 220.800 4804.82 4860.90 6715.59 S 5662.69 W 5987154.21 N 470309.28 E 0.431 -8784.35
10615.51 67.230 222.450 4842.61 4898.69 6781.14 S 5720.94 W 5987088.84 N 470250.81 E 1.948 -8872.01
,.-
10710.22 66.710 222.580 4879.66 4935.74 6845.39 S 5779.85 W 5987024.79 N 470191.70 E 0.563 -8959.09
10803.39 68.760 222.700 4914.96 4971.04 6908.81 S 5838.25 W 5986961.55 N 470133.09 E 2.204 -9045.21
10898.34 68.170 222.710 4949.81 5005.89 6973.72 S 5898.15 W 5986896.84 N 470072.98 E 0.621 -9133.44
10991.91 67.750 222.320 4984.93 5041.01 7037.65 S 5956.76 W 5986833.10 N 470014.17 E 0.592 -9220.09
11 086.19 67.480 222.190 5020.83 5076.91 7102.17 S 6015.38 W 5986768.76 N 469955.34 E 0.313 -9307.19
11180.94 68.730 222.190 5056.16 5112.24 7167.31 S 6074.43 W 5986703.82 N 469896.09 E 1.319 -9395.04
11275.40 68.470 220.750 5090.63 5146.71 7233.21 S 6132.67 W 5986638.11 N 469837.64 E 1 .446 -9482.96
11369.25 67.860 222.950 5125.54 5181.62 7298.10 S 6190.78 W 5986573.40 N 469779.31 E 2.271 -9570.02
11462.83 67.390 222.200 5161.16 5217.24 7361.82 S 6249.33 W 5986509.87 N 469720.56 E 0.895 -9656.4 7
11556.70 68.700 221.020 5196.26 5252.34 7426.91 S 6307.14 W 5986444.96 N 469662.55 E 1.818 -9743.49
11650.82 68.500 220.170 5230.60 5286.68 7493.45 S 6364.16 W 5986378.60 N 469605.31 E 0.867 -9831.12
11746.56 68.510 220.520 5265.68 5321.76 7561.35 S 6421.83 W 5986310.90 N 46954 7.42 E 0.340 -9920.20
11839.51 68.370 219.140 5299.84 5355.92 7627.73 S 6477.20 W 5986244.69 N 469491.84 E 1.389 -10006.64
11935.13 68.170 218.970 5335.24 5391.32 7696.71 S 6533.16 W 5986175.89 N 469435.65 E 0.267 -10095.45
12028.49 67.810 220.670 5370.24 5426.32 7763.18 S 6588.59 W 5986109.59 N 469380.02 E 1.732 -10182.01
12133.76 67.560 216.320 5410.22 5466.30 7839.38 S 6649.19 W 5986033.59 N 469319.17 E 3.830 -10279.33
~ 12226.21 66.820 216.770 5446.06 5502.14 7907.84 S 6699.93 W 5985965.29 N 469268.21 E 0.918 -10364.39
12319.36 66.270 220.250 5483.15 5539.23 7974.70 S 6753.12 W 5985898.61 N 469214.80 E 3.478 -10449.80
12413.18 67.560 219.500 5519.94 5576.02 8040.94 S 6808.45 W 5985832.55 N 469159.26 E 1.559 -10536.10
12507.64 66.950 217.980 5556.46 5612.54 8108.88 S 6862.97 W 5985764.78 N 469104.53 E 1.618 -10623.19
12600.69 66.700 219.370 5593.08 5649.16 8175.66 S 6916.42 W 5985698.17 N 469050.86 E 1.399 -10708.71
12692.25 66.450 219.840 5629.48 5685.56 8240.39 S 6969.98 W 5985633.62 N 468997.09 E 0.544 -10792.72
12785.71 66.300 219.620 5666.93 5723.01 8306.24 S 7024.71 W 5985567.94 N 468942.15 E 0.269 -10878.35
12878.67 66.280 219.010 5704.31 5760.39 8372.09 S 7078.63 W 5985502.26 N 468888.02 E 0.601 -10963.45
12970.17 65.810 218.620 5741.46 5797.54 8437.24 S 7131.05 W 5985437.28 N 468835.39 E 0.645 -11047.05
13068.85 65.420 219.620 5782.21 5838.29 8506.97 S 7187.75 W 5985367.73 N 468778.46 E 1.004 -11136.92
13164.06 65.980 219.110 5821.39 5877.4 7 8574.06 S 7242.79 W 5985300.82 N 468723.21 E 0.764 -11223.69
13257.79 66.630 217.980 5859.05 5915.13 8641 .19 S 7296.27 W 5985233.87 N 468669.52 E 1.304 -11309.49
13323.65 67.490 217.110 5884.72 5940.80 8689.28S 7333.23 W 5985185.90 N 468632.41 E 1.785 -11370.08
13415.82 67.500 215.660 5920.00 5976.08 8757.83 S 7383.74 W 5985117.51 N 468581.68 E 1.453 -11455.06
------- --~---"--------- --- ------------- - ---
24 June, 2003 - 17:09 Page 50'6 Drif/Quest 3.03.02.005
Sperry-Sun Drilling Services
Survey Report for Kuparuk 3S Pad - 38-24 MWD
Your Ref: API 501032045600
Job No. AKMWOOO2449740, Surveyed: 5 June, 2003
Western North Slope
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
13508.94 67.430 215.040 5955.69 6011.77
13589.45 67.420 215.160 5986.60 6042.68
13656.00 67.420 215.160 6012.15 6068.23
Loca' Coordinates
Northings Eastings
(ft) (ft)
8827.98 S
8888.80 S
8939.04 S
7433.50 W
7476.25 W
7511.63 W
Global Coordinates
Northings Eastings
(ft) (ft)
5985047.52 N
5984986.84 N
5984936.71 N
,..-
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to RKB = 55.8' M.S.L.. Northings and Eastings are relative to 2565' FNL, 1266' FEL.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from 2565' FNL, 1266' FEL and calculated along an Azimuth of 40.000° (True).
Magnetic Declination at Surface is 25.092°{18-May-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 13656.000.,
The Bottom Hole Displacement is 11676.09ft.. in the Direction of 220.041° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
13656.00
8939.04 S
7511.63 W Projected Survey
6068.23
~
Survey tool program for 35-24 MWD
From
Measured Vertical
Depth Depth
(ft) eft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
362.00
361.67 Tolerable Gyro (38-24 Gyro)
6068.23 MWD Magnetic (3S-24 MWD)
0.00
361.67
362.00
13656.00
24 June, 2003 - 17:09
Page 60f6
468531.69 E
468488.75 E
468453.20 E
Dogleg Vertical
Rate Section
(0/100ft)
ConocoPhWips
Comment
0.620 -11540.78
0.138 -11614.85
0.000 -11676.08 Projected Survey
-------------------- -- -----~-----~--
Dri/lQuest 3.03.02.005
"}
)
~()3 --DlL1
t1 ?,3C1
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West ih Avenue, Suite 100
Anchorage, Alaska
June 19, 2003
RE: MWDFormation Evaluation Logs 3S-24,
AK-MW-2449740
1 LDWG fonnatted Disc with verification listing.
JlPI#: 50-103-20456-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Service
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
!~":: (t''":: ; :')
i\~ 9 r "~I
:!.) .~ IJ ('
Signed: f? ~
(,Date:
/",1,', ,".', ,or:. 1'1
! ,'I :', ',:1'
Re: 38-24 I PTD 203-079
\
l
Subject: Re: 35-24 I PTD 203-079
Date: Fri, 09 May 2003 14:12:01 -0800
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: Scott L Lowry <Scott.L.Lowry@conocophillips.com>
No further paperwork needed Scott. I will put a copy of this note in the well
file. Your plan will reduce the total cement volume by just under 100 bbls.
I support your plan. I am not sure how the specific volumes (inside versus
outside) work for you on this well, but you might put a dyed marker pill
somewhere ahead of your spacer (maybe 50 to 100 bbls) and then use that as a
flag to help optimize the cement you mix.
One thing I would be interested to know is how much cement you have actually
left in the various surface holes you have drilled. That is a number we look
at when you make an application for annular disposal. The calculated numbers I
have left in the hole are gauge plus 60 to 220%. Quite a range, but it would
seem that your plan to pump gauge plus 250% should cover you.
Good luck with the operation.
Tom Maunder, PE
AGOCC
Scott L Lowry wrote:
> Tom,
>
> In the permit to drill application, I specified the following cement
> volumes for the 9 5/8" surface casing:
>
> 630 sx AS Lite
> 390 sx LiteCrete
>
> I wish to change the volumes to:
>
> 510 sx AS Lite
> 390 sx LiteCrete
>
> I am reducing the excess cement percentage in the permafrost from 350% to
> 250%. We have averaged 218 bbls of cement to surface over the last 8 wells
> at DS-3S. Please let me know if I need to submit any additional paperwork
> to make this alteration.
>
> Sorry for the inconvenience,
>
> Scott L Lowry
> Drilling Engineer
> ConocoPhillips Alaska Inc.
> Voice: 907-265-6869
> Cell: 907-240-5322
> E-Mail: scott.I.lowry@conocophillips.com
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of 2
.')
5/9/20032:12 PM
~C?Œ\~~~ ~,~ ~~~~~~~ ;)¡
~ .J LAL,f ~
AIIASIiA OIL AND GAS /
CONSERVATION COltDllSSION
Randy Thomas
Kuparuk Drilling Team Leader
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage AK 99510
FRANK H. MURKOWSK/. GOVERNOR
333 W. pH AVENUE. SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re:· Kuparuk River Field 3S-24
ConocoPhillips Alaska, Inc.
Permit No: 203-079
Surface Location: 2565' FNL, 1266' FEL, Sec.18, TI2N, R8E, UM
Bottomhole Location: 897' FNL, 1395' FWL, Sec. 25, TI2N, R7E, UM
Dear Mr. Thomas:
Enclosed is the approved application for permit to drill the above referenced development well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this pem1Ït may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Si'ncerely,
k~~
Randy Ruedrich
Commissioner
BY ORDER OF THE COMMISSION
DATED this3 day of May, 2003
cc: Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
ConocÓPhiUips
')
Post Office Box 100360
Anchorage, Alaska 99510-0360
Randy Thomas
Phone (907) 265-6830
Fax: (907) 265-1535
Email: randy.l.thomas@conocophillips.com
April 28, 2003
Alaska Oil and Gas Conservation Commission
333 West yth Avenue
Suite 100
Anchorage, Alaska 99501
(907) 279-1433
Re: Application for Permit to Drill, producer 3S-24
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore producer well, KRU 3S-24, a
development well.
Note that it is planned to drill the surface hole without a diverter. There have been 12 wells drilled on 3S
pad with no significant indication of gas or shallow gas hydrates.
Please find attached for the review of the Commission the information required by 20 ACC 25.005 (c).
If you have any questions or require any further information, please contact Scott Lowry at 265-6869.
Sincerely,
\<--4 \~.
Randy Thomas
GKA Drilling Team Leader
)
)
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
RedrillU
1 a. Type of Work: Drill 0
Re-entry D
2. Operator Name:
ConocoPhillips Alaska, Inc.
3. Address:
ExploratoryU Development Oil ~ Multiple Zone D
Service D Development Gas D Single Zone 0
5. Bond: U Blanket U Single Well 11. Well Name and Number:
Bond No. 59-52-180 3S-24
6. Proposed Depth: 12. Field/Pool(s):
MD: 13600' TVD: 6024' Kuparuk River Field
7. P;fg~ ~lifn7 IJ..\.
~ & 25551 /" ,) Kuparuk River Pool
8. Land Use Permit: 13. Approximate Spud Date:
1b. Current Well Class:
Stratigraphic Test D
P.O. Box 100360 Anchorage, AK 99510-0360
4a. Location of Well (Governmental Section):
Surrace:2565'FNL, 1266'FEL,Sec. 18,T12N,R8E,UM
Top of Productive Horizon:
644' FNL, 1608' FWL, Sec. 25, T12N, R7E, UM
Total Depth:
897' FNL, 1395' FWL, Sec. 25, T12N, R7E, UM
4b. Location of Well (State Base Plane Coordinates):
5/16/2003
ADL 2616 & 2639
9. Acres in Property:
2560
14. Distance to
Nearest Property: 644'
10. KB Elevation
15. Distance to Nearest
Surrace: x- 475994
16. Deviated wells:
Kickoff depth: 200'
18. Casing Program
Size
Zone-
y- 5993852
4
Well within Pool: 3S-23 , 22' @ 325'
(Height above GL): 28 feet
17. Anticipated Pressure (see 20 AAC 25.035)
Max. Downhole Pressure: 3417 psig
Setting Depth
Maximum Hole Angle:
ft.
/ Max. Surrace Pressure: 2769 psig
Quantity of Cement
c. f. or sacks
(including stage data)
66 sx ArcticCrete
630 sx AS Lite & 390 sx LiteCrete
260 sx Class G
68°
Top Bottom
Length MD TVD MD TVD
80' 28' 28' 108' 108'
4476' 28' 28' 4504' 2618'
13572' 28' 28' 13600' 6024'
Specifications
Grade Coupling
B Weld
L-80 BTC
L-80 BTC-M
Hole Casing
42" 16"
12.25" 9.625"
8.5" 7"
Weight
62.5#
40#
26#
PRESENT WELL CONDITION SUMMARY
Total Depth TVD (ft): Plugs (measured)
(To be completed for Redrill and Re-Entry Operations)
Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured)
19
Total Depth MD (ft):
Casing
Structural
Conductor
Detailed Operations
Intermediate
Production
Liner
Perforation Depth MD (ft):
Length
Cement Volume
Size
MD
TVD
Perforation Depth TVD (ft):
BOP Sketch D
Diverter Sketch D
Drilling Program 0
Seabed Report D
Time v. Depth Plot D
Drilling Fluid Program 0
Date:
Shallow Hazard Analysis D
20 AAC 25.050 requirements 0
20. Attachments: Filing Fee 0
Property Plat D
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Scott Lowry @ 265-6869
Title Kuparuk Drilling Team Leader
Phone Date '-II" ., /iJ j
PreDared bv Sharon AflsuD-Drake
R. Thomas
Printed Name
Signature
\~
t
~~
Commission Use Only
Permit Approval
Date: 51'! â"(,
Mud log required
Directional survey required
Permit to Drill :3 _ '- C}
Number: 20.. 0 7 I
API Number:
50- /03·- 2DC¡ 56-· 06
l ] Yes ~ No
D Yes ~No
See cover letter
for other requirements
~~~~VI::U
APR 2 8 70nl
Alaska Oil & Gas Cons. Commission
An~a~e~
Date: s-; J/~?
Conditions of approval:
Samples required
Hydrogen sulfide measures
Other:
tk--5
COMMISSIONER
__ 11'- ~
I 'I
f ~'~," l ,1 e,
ø '~J~l(1
BY ORDER OF
THE COMMISSION
Approved by:
\ ~ L
. )...
.; \!,
Form 10-401 Revised 3/2003·
Submit in duplicate
)
,A"'-'~cation for Permit to Drill, We1l3S-24
, Revision No.O
I Saved: 28-Apr-03
Permit It - Kuparuk Well 35-24
Application for Permit to Drill Document
M(lximizE
We-II \'ÇlI~1;
Table of Contents
1. Well Name.... ... ... ........... ..... ......... ... ................. ...... ......... .... ...... ...... ... ..... ...... ........ ..... 2
Requirements of 20 AAC 25.005 (f).... .......... ...................... ......... .................. ............ ..................... ........2
2. Location Sum mary .......... ... ..... ... ... ........... ... ... ...... ......... ......... ............... ................ ... 2
Requirements of 20 AAC 25.005(c)(2) ...... ........ .................. ...... ............. ...... ........ .... ................. ...... ....... 2
Requirements of 20 AAC 25. 050(b)..... ........ ........................ ........ ................. ............. .............................2
3. Blowout Prevention Equipment Information .........................................................3
Requirements of 20 AAC 25.005(c)(3) ...... .......... .......... .............. ...... ........... ............. ............................. 3
4. Dri Iii ng Hazards Information.. ... .............. ... ... ...... ........ ............ ............. ............ .... ... 3
Requirements of 20 AAC 25.005 (c)( 4) ............... ................. ....... .............. ...................... .......... ............. 3
5. Procedure for Conducting Formation Integrity Tests ........................................... 3
Requirements of 20 AAC 25.005 (c)(5) ..................................................................................................3
6. Casi ng and Cementing Program.............................................................................4
Requirements of 20 AAC 25.005(c)(6) ................ ............ .......... .................... ...... ...... ................. ............ 4
7. Diverter System Information ....... ............ ...... ...... ....... ....... ...... ........... ...... .... .... ....... 4
Requirements of 20 AAC 25.005(c)(7) .. ............ .............. ............ ............ ................. .................. ............ 4
8. Dri II i ng FI u id Program ........... ...... .......... ..... ................ ....... .... ....... ....... ..... ......... ...... 4
Requirements of 20 AAC 25.005(c)(B) .. ................... ....... ..... ............ .............. ........ ..................... ........... 4
9. Abnormally Pressured Formation Information ......................................................5
Requirements of 20 AAC 25.005 (c)(9) .. ............. ............ ....... ..... ............ ........ ................ ....................... 5
10. Seismic Analysis.. ....... ................. ..... ....... ... ......... ..... ..... .... ... ....... ... ..... ..... .... ........... 5
Requirements of 20 AAC 25.005 (c)(10) ................................................................................................ 5
11. Seabed Condition Analysis .....................................................................................6
Requirements of 20 AAC 25.005 (c)(11) ................................................................................................ 6
12. Evidence of Bond i ng ..... ... .......... ......... ... ..... ..... ....... ..... ................ ... ..... .... ........ ....... 6
Requirements of 20 AAC 25.005 (c)(12) ................................................................................................6
13. Proposed Dri Iii ng Program . .......... ...... ... .... ... ..... ... .......... .... ... ........... ... .... .......... ..... 6
O R·, ~("..'.. .:~ "' ~ ,r\. ,
II ; J :\
iJ¡ I ., , ,\
j ~ \;.j j ~ I)" ',;~.
38-24 PERM/T IT. DOC
Page 1 of 7
Printed: 28-Apr-03
)
Ar""'~cation for Permit to Drill, Well 3S-24
, Revision No.O
I Saved: 28-Apr-03
Requirements of 20 AAC 25.005 (c)(13) ................................................................................................ 6
14. Discussion of Mud and Cuttings Disposal and Annular Disposal....................... 6
Requirements of 20 AAC 25.005 (c)(14) ................................................................................................ 6
15. Attachments......... ............... ... .... ...... ... ............ ................ .......... ..... ......... ....... ... ... .... 7
Attachment 1 Directional Plan................... ......................................... ................ .... .................... ....... .... 7
Attachment 2 Drilling Hazards............................................................................................. 6
Attachment 3 Well Schematic..............................................................................................6
1. Well Name
Requirements of 20 AAC 25.005 (f)
Each well must be Identified by a unique name des¿qnated by the operator and a unique API number assigned by the commission
under 20 AAC 2s'040(b). For a well with multiple well blanche!;,:, each branch must similarly be Identified by a unique name and API
number by adding a suffix to the name desi..qnated for the well by the operator and to the number as..':ii..qned to the well by the
commis..':iion.
The well for which this application is submitted will be designated as 3S-24.
2. Location Summary
Requirements of 20 AAC 25.005(c)(2)
An application for a Permit to Olill must be accompanied by each of the lollowing item!J~ except lor an item already 0/1 flÏe with the
commis!J"ion and Identífied in the application:
(2) a plat identifyli7g the property and the property's owners and showing
(A)the coordinates of the proposed location of the well at the surface, at the top of ec-1ch oL?fective formation and at total depth,
referenced to governmental section lines.
(8) the coordinates of the proposed location of tl7e well at the surface, referenced tv the state plane coordinate sy.stem fvr this
state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration;
(C) the propo~-ed depth of tl1e well at the top of eaä, objective formation and at total depth;
Location at Suñace
NGS Coordinates
Northings: 5,993,852
I 2565' FNL, 1266' FEL, Sec 18, T12N, R8E, UM
RKB Elevation
Eastings,' 475,994 Pad Elevation
56.1' AMSL
28.0' AMSL
Location at Top of
Productive Interval
(Kuparuk "C" Sand)
NGS Coordinates
Northings: 5,985,240
644' FNL, 1608' FWL, Sec 25, T12N, R7E, UM
Eastings: 468,750
Measured Depth, RKB,'
Total Vertical Depth, RKB:
Total Vertical Depth, 55:
13244'
5891 '
5835'
Location at Total Depth I 897' FNL, 1395' FWL,
NGS Coordinates
Northings: 5,984,988 Eastings: 468,536
Sec 25, T12N, R7E, UM
Measured Depth, RKB,'
Total Vertical Depth, RKB:
Total Vertical Depth, 55:
13600'
6024'
5968'
and
(0) other infom7ation required by 20 AAC 25.050(b);
Requirements of 20 AAC 25.0S0(b)
If a well is to be intenäonally deviated, the application for a Permit to On/I (Fom11 0-401) must
(1) include a plat, drawn to a sUItable scale, showing the path of the proposed wellbore, including all adjacent well bores within 200
feet of any portion of the proposed well,'
Please see Attachment 1: Directional Plan
J [] ~'~~l .~ ~ !1 ,ì l
ri g\ L; i g J jLJ ~
3$-24 PERMIT IT. DOC
Page 2 of 7
Printed: 28-Apr-03
)
,A"'~cation for Permit to Drill, We1l3S-24
, Revision No.O
Saved: 28-Apr-03
and
(2) for all wel/.<:i wlÜ7in 200 feet of the propD.';ed wellbore
(A) list the names of the operators of those wel/.,>~ to the extent that thosC! names are known or discoverable in public record~
and show that each named operator has been furnished a copy of the application by certitìed ma/~' or
(B) state that the applicant is tile only affected owner.
The Applicant is the only affected owner.
3. Blowout Prevention Equipment Information
Requirements of 20 AAC 25.005(c)(3)
An application for a Pel7l11t to Drill must be ac:r.:ompanied by eacl7 of the following Item~ except for an item already on file with the
commission and identifìed in the application:
(3) a diagram and description of the blowout prevention equipment (BOPE) as required by 20 AAC 25.03S¡ 20 AAC 25.036, or 20
AAC 25.03~ as applicable/
Please reference BOP schematics on file for Nabors 7E5.
4. Drilling Hazards Information
Requirements of 20 AAC 25.005 (c)(4)
An application for a PermIt to Drill must be acevmpanied by each of the following ¡[em5~ eXŒpt fÒr an item already on ñle with the
c;vmmis:"ion and identifìed in the application:
(4) infonT/ation on drilling hazards; including
(A) the maximum downhole pressure that may be encountered, cnter/a used to determine if;, and maximum potential surface
pressure based on a methane gradient;
A pressure build-up test performed on Palm lA (35-26) in 4/01 indicated a reservoir pressure in the
Kuparuk C sand of 3597 psi at 5830' tvd, 0.62 psi/ft or 11.9 ppg EMW (equivalent mud weight). Due to
pressure depletion, the predicted reservoir pressure for 35-24 is predicted at 3400 psi at 5891' tvd, 0.58
psi/ft or 11.1 ppg EMW.
The maximum potential surface pressure (MP5P) while drilling 35-24 is calculated using above maximum
reservoir pressure, a gas gradient of 0.11 psi/ft, and the Kuparuk C sand target at 5891' tvd:
MP5P =(5891 ft)*(0.58 - 0.11 psi/ft)
= 2769 psi
(8) data on potential gas zone:.,-,!
The well bore is not expected to penetrate any gas zones.
and
(C) data concerning potential causes of hole problem_,; such as abnormally geo-pressured strataf lost circulation zone~ and zones
that have a propensity for differential sticking;
Please see Attachment 2 - Drilling Hazards Summary
5. Procedure for Conducting Formation Integrity Tests
Requirements of 20 AAC 25.005 (c)(5)
An application for a Permit to Drill must be accompanied by each of the following itemsf except for an item already on fìle wIth the
commission and Identified in the application:
(5) a description of the procedure for conducting formation integrity test~ as required under 20 AAC 25.030(fJ·
A procedure is on file with the commission for performing LOT's. For 35-24 the procedure will be
followed with one exception. The surface casing shoe will be pressured until leak-off occurs and the 16.0
ppg EMW maximum will not be observed. (see step 6 in the procedure)
~ f1fi~ ~,f/1L
,~ ,1 l:il ~ l'"\~;
3$-24 PERM/T IT. DOC
Page 3 of 7
Printed: 28-Apr-03
')
.A~",(.cation for Permit to Drill, We1l3S-24
, Revision No.O
Saved: 28-Apr-03
6. Casing and Cementing Program
Requirements of 20 AAC 25.005(c)(6)
An application for a Permit to Drill must be acc;vmpanied by each of the following item5~ except for an item already on file with the
commission and identified in the application:
(6) a complete proposed casing and cementing program as required by 20 MC 25.03~ and a description of any slotted liner; pre-
pelforated liner; or screen to be 1Ì7stalled;:
Casinq and Cementing Program
Ho/e Top Btm
CsglTbg Size Weight Length MDITVD MDITVD
00 (in) (in) (/blft) Grade Connection (ft) (ft) (ft) Cement Program
30 X 16 42 62.5 H-40 Welded 80 28 / 28 108 / 108 9 cy High Early
Insulated
9-5/8 12-1/4 40 L-80 BTC 4476' 28'/28' 4504'/2618' Lead: 630 sx 10.7 ppg
AS Lite
Tail: 390 sx 12.0 ppg
'LiteCREfE'.
(Yield=2.40 cuft/sk)
Planned TOC=Surface
7 8-1/2 26 L-80 BTC-Mod 13572' 28'/28' 13600'/6024' 260 sx 15.8 ppg 'G' w/
add.
Planned TOC= 12444'
3-1/2 9.3 L-80 EUE 8rd 13116' 28' / 28' 13144'/5853' SAB-3 packer set at
Mod 13144' MD.
If 7" casing must be top-set above the Kuparuk C sand, 6 1/8" hole would be drilled to total depth and a
3 '12" 9.3 ppf L-80 SLHT production liner will be cemented across the productive interval.
7. Diverter System Information
Requirements of 20 AAC 25.005(c)(7)
An applic'i¡tion for a Permit to On/I flU/st be accompanied by eaäl of'the following item:,~ except for an item already on file with the
commi!;,:;ion and Identified in the application:
(7) a dia.qram and de:,Y:ription of the diverter system as required by 20 MC 25. 03.~ unless this requirement l~ waived by the
commission under 20 MC 25.035(11)(2);
Please reference diverter schematic on file for Nabors 7ES. ConocoPhillips plans not to use a diverter on
well 35-24.
8. Drilling Fluid Program
Requirements of 20 AAC 25.005(c)(B)
An applicatIon for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file with the
commissIon and Identified in the application:
(8) a dlilling flUId program/ inc!udlÌ7g a diagram and description of the drilling fluid system/ as required by 20 MC 25.033;
Drilling will be done using mud systems having the following properties:
O ,.., 1'~ r "I J1L
. ,J Ii' :,"'~ :;. d.' of '.'
: I "",,'; ~ t ,) r"'¡
3S-24 PERMIT IT. DOC
Page 4 of 7
Printed: 28-Apr-03
)
A"''''·\ipation for Permit to Drill, Well 38-24
\ ) Revision No.O
Saved: 28-Apr-03
Surface Hole mud properties
Spud to Base of Permafrost
Initial Value Final Value
8.6 9.0*
120-130 120-130
Base of Permafrost to Total Depth
Initial Value Final Value
9.0* 9.4*
120-130 120-130
Density (ppg)
Funnel Viscosity
(seconds)
Yield Point
(cP)
Plastic Viscostiy
(/b/100 sf)
10 second Gel
Strength (lb/100 sf)
10 minute Gel
Strength (/b/100 sf)
pH 8-9
API Fiftrate(cc} 12-15
Solids (%) 6-9
* 9.8 if hydrates are encountered
35-45
8-15
27 -40 25-35 20-30
11-22 15-30 15-30
10-25 1 0-25 10-25
25-55 20-40 15-35
8-9 8-9 8-9
7-8 7-8 7-8
6-12 6-12 6-12
10-30
25-55
Production Hole mud properties
initial C40 Top Morraine Top HRZ Kuparuk
Density (ppg) 8.8 10.2 10.6 10.8 11.6
Funnel Viscosity 40-55 42-55 42-58 42-58 42-58
(seconds)
Yield Point 11-15 20-25 20-25 20-25 20-25
(cP)
Plastic Viscostiy 6-12 8-15 8-16 8-18 15-25
(lb/100 sf)
10 second Gel 2-5 3-6 3-6 4-7 4-8
Strength (lb/100 sf)
10 minute Gel 4-10 7-10 7-112 7-12 8-16
Strength (/b/100 sf)
pH 9-9.5 9-9.5 9-9.5 9-9.5 9-9.5
API Fiftrate(cc} <6 <6 <6 <4 <4
Solids (%) 6-11 9-14 1 0-15 1 0-15 15-19
Diagram of Nabors 7ES Mud System on file.
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 MC 25.033.
9. Abnormally Pressured Formation Information
Requirements of 20 AAC 25.005 (c)(9)
An application for a Permit to Dnll must be accompanied by each of the following item~ except for an item already on file with the
commission and Identified in the application:
(9) for an exploratory or stratigraphic test well, a tabulation settJi7g out the depths of predicted abnormally geo-pressured strata as
required by 20 AAC 25.033(f);
N/ A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
Requirements of 20 AAC 25.005 (c)(10)
An application for a PermIt to Dnll must be accompanied by each of the following Item~ except for an item already on file with the
commission and Identified in the application:
(10) for an exploratOlY or stratigraphic test well, a seismic refraction or reflection analysis as required by 20 AAC 25.061(a);
N/ A - Application is not for an exploratory or stratigraphic test well.
O Ft· ...... r '-'. ~ . ~ " ,
.,' , I,· '··.1 . t
", ä \i,r~ i.~ "J :.
3S-24 PERMIT IT. DOC
Page 5 of 7
Printed: 28-Apr-03
')
AI"""~cation for Permit to Drill, We1l3S-24
) Revision No.O
, Saved: 28-Apr-03
11. Seabed Condition Analysis
Requirements of 20 AAC 25.005 (c)(11)
An application for a Permit to Drill must be accompanied by ead7 of the following Items~ except for an item already on file with the
commission and identified in the application:
(11) lor a well drílled from an offshore platform, mobile bottom-founded structure, þ'~ck-up lig, or floating drilling vesse~ an analysis
of seabed conditions as required by 20 AAC 25.061(b);
N/ A - Application is not for an offshore well.
12. Evidence of Bonding
Requirements of 20 AAC 25.005 (c)(12)
An application for a Permit to Drill must be accompanied by eaä7 of the following items, except for an item already on file with the
commis..'?ion and identified in the application:
(12) evidence showing that the requirements of 20 AAC 25.025 {Bonding)have been met;
Evidence of bonding for Phillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
Requirements of 20 AAC 25.005 (c)(13)
An application for a Permit to Dnll must be accompanied by each of the lollowing items, except lor an item already on file with the
commission and Identified 1Í7 the c7pplication:
The proposed drilling program is listed below. Please refer as well to Attachment 3, Well Schematic.
1. MIRU Nabors 7ES.
2. N/U riser (no diverter).
3. Drill 12-1/4" hole to 9-5/S" surface casing point according to directional plan. No LWD logging
equipment required.
4. Run and cement 9-5/S" 40#, L-SO BTC casing string to surface. Employ lightweight permafrost
cement lead slurry and LiteCRETE tail slurry. Pump adequate excess to ensure cement reaches
the surface. If cement does not circulate to surface, perform top job. Install and test BOPE to
5000 psi. Test casing to 2500 psi.
5. Drill out cement and 20' of new hole. Perform LOT.
6. Drill S-1/2" hole to total depth according to directional plan. Run LWD logging equipment with
GR, resistivity, and density-neutron. Run 7" 26# L-SO BTCM casing to surface and cement.
Note: If significant hydrocarbon zones are present above the Kuparuk C sand, sufficient cement
will be pumped for isolation in accordance with 20 MC 25.030(d)(3)(C).
7. Run 3-1/2" 9.3#, L-SO Srd EUE Srd-Mod completion assembly w/ SAB-3 permanent packer and
PBR. Set packer 100' above top planned perforation, shear out of PBR, P/U tubing hanger, and
land tubing. Pressure test tubing to 3500 psi. Pressure test 3 112" x 7" annulus to 3500 psi.
Burst shear valve for freeze protect.
S. Set TWC and ND BOPE. Install and pressure test production tree.
9. Freeze protect. Secure well. Rig down and move out.
10. Handover well to Operations Personnel.
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
Requirements of 20 AAC 25.005 (c)(14)
An appficatJon for a PermIt to Dlifl mustc be accompanied by each of t!7e following items, except for an item already on file with the
commission and Identified in the application:
(14) a general desCliptJon of how the operator plans to dispose of dnlling mud and cuttings and a statement of whether the
operator 1i7tends to request authorization under 20 MC 25.080 for an annular disposal operation in the well.;
Waste fluids generated during the drilling process will be disposed of down a permitted annulus on 3S
pad or hauled to a KRU Class II disposal well. All cuttings will be disposed of either down a permitted
annulus on 3S pad or hauled to the Prudhoe Bay Field for temporary storage and eventual processing for
injection down an approved disposal well.
OR t I'~ , ~ , A l
"' i' í ,,' ;: ,; / j il
-. . ··1 )' l..¡: J :i '.i f"·~. ,.~
3$-24 PERMIT IT. DOC
Page 6 of 7
Printed: 28-Apr-03
)
,l\-'~cation for Permit to Drill, We1l3S-24
) Revision No.O
Saved: 28-Apr-03
At the end of drilling operations, an application may be submitted to permit 35-24 for annular pumping of
fluids occurring as a result of future drilling operations on 35 pad.
15. Attachments
Attachment 1 Directional Plan
Attachment 2 Drilling Hazards Summary
Attachment 3 Well Schematic.
0,,"'-' " ,:"":1 ,~~
"',"~, , '
, j~,~\;ij;:
38-24 PERMIT IT. DOC
Page 7 of 7
Printed: 28-Apr-03
~
,~
--~
Sperry-Sun Drilling Services
ConocoPhillips Ala.
Western NOI:
Kuparu "
---
CJ
~
a..~.r ~ 0_ :9
~~
~~-" .,
Proposal Report
~,.~- ~
- .....,~
26 October, 2003
r--
Your Ref: Revised BHL per Doug Knock (4-17-03)
Surface Coordinates: 5993851.58 N, 475993.50 E (70023' 39.5895" N, 1500 11' 43.1639" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
'.....~~
Kelly Bushing: 55. 80ft above Mean Sea Level
!5pEr'r'Y-SLJrl
DAII_LING SERVICES
A Haliîburton Company
Proposal Ref: pro2020
)
)
ConoafPt,illips
ConocoPhillips Alaska, Inc.
North Slope, Alaska
Pal m (3S Pad)
3S-24 (wp05)
Scale: 1 inch = 200011
Measured
Depth
O.O()
200.()()
550.00
2()86.52
13243.89
1360().OO
35-24 (wp05) Proposal Data
Vertical Origin: RKB = 55.8' M.S.l.
Horizontal ðrigin: 2565' FNL. 1266' FEL
Measurement Units: ft
Nor1h Reference: True Nor1h
Dogleg severily: Degrees per 100 feet (US Survey)
Vertical Section Azimuth: 220000'
Vertical Section Description: 2565' FNL. 1266' FEL
Vertical Section Origin: 0.00 N,O.OO E
Azlm, Vertical Northlngs Eastlngs
Depth
-6000
I
Eastings
-4000
,
-2000
I
o
SHL (2565' FNL & 1266' FEL, SEC.
Begin Dir @ 2.0°/10011 (In 12-114" Hole): 200.0011 MD, 200.0011 TV
'··-0
Increase DLS 104.0°/10011 : 550.0011 MD, 549.1311 TVD
End Dir, Slart Sail @ 68.011° : 2086.52fIMD,1713.14ItTVD
9-5/8" Csg Pt... Drill out 8-1/2" Hole:
4344.88.00ft MD, 2558.74ft TVD
- -2000
O.OCX>
0.000
7.000
68.011
68.011
68.011
0.000 0.00 (WON O.I)()E
0.000 200.1X) (WON O.WE
2CX>.0()() 549.13 20.07 S 7.:~OW
220.103 17]3.14 72152 S 551A2W
220.103 5B90.80 86:14.80S 72L5XL W
220.103 6024.14 8887.% S 7428.5\ W
Vertical Dogleg
Section Rate
O.()()
O.IX) O.OW
20.07 2.000
907.16 4,1X)()
11252.87 O.IXIO
1I5B3.07 0.000
- -4000 C/)
C)
c:
E
t
o
Z
Incl,
The "Along Hole Displacement" for this profile is 11586.09ft
The "Directional Difficulty Index" for this profile is 6.0
D Plan
N
'*'.'..'..'....\
.............."'....................'......'.
\'" ,:;
- -6000
~
II
g
:;::
Qj
ëiI
(j¡
- -8000
Reference is True North
Tolal Deplh @ 13600.0011 MD, 6024.1411 TVD
(897' FNL & 1395' FWL, SEC. 25- T12N-R7E)
Well:
Current Well Properties
3S-24 Plan
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Project H Reference:
Ref. Geographical Coordinates:
5993851.58 N, 475993.50 E
993769.36 N, 27198.02 W
70° 23' 39.5895" N, 150" 11' 43.1639" W
2565' FNL & 1266' FEL, SEC. 18- T12N - R8E
55.8Oft above Mean Sea Level
RKB Elevation :
-.i
uj
~ 2000-
o ~-.---- _.~SHI. (?fjf{;' FNL & 1<'6(;' FEL, SEC. 18- T12N - FWE)
________ Begin Dir @ 2.0°/10011 (in 12-1/4" Hole):
I 200.0011 MD, 200,0011 TVD
~ 'oa~' DLS ~ '.0''''., , 550.0011 100, "'.1.' TW
i ' od Di', 9'M Soil @ 6II.OW , "'"'2ftMD, 171" "ftlVD
·~oo.oo
~, f3-5/8" Csg Pt... Drill out 8_1/2" Hole: 4344.88.000 MD, 2558.74ft TVD
*~oo
North Reference:
Unks:
True North
Feet (US SUlvey)
5par".....y-sul1
DAIL-LING SeAVICeS
A HallibU'rton Company
Co
Lri
L!')
II
CD
~
ES
.c:
õ..
Q)
o
~ 4000-
t::
Q)
>
TARGET 'Ä 13243.89ft MD, 5890.SOft TVD
(644' FNL & 1608' FWL, See 25-T12N-R7E)
'~..~,.w I
"- ,-J.:~~"
TOlal Depth @ 13600.00fl MD, 6024.1411 TVD ~
(897' FNL & 1395' FWL, SEC. 25- T12N-R7E)
I I I
8000 10000 12000
Scale: 1 inch = 200011
~ I
II 6000 -
~
w 0
1]
en
I
2000
I
4000
I
6000
DrillQuest 3.03.02.002
Or;i
.J f~
......, r. r~
",I ~
/) ,
:J :,'~
l:i ¡ ,/
ConocoPhillips Alaska, Inc. 35-24 (wp05)
MD Inc Azim. SSTVD TVD N/S E/W y X DLS V.S. Comment
(1t) (Deg) (Deg) (ft) (ft) (ft) (ft) (ft) (ft) e/100ft) (ft) ~_.
0.00 0.00 0.00 -55.80 0.00 0.00 N 0.00 E 5993851.58 N 475993.50 E 0.00 0.00 SHL
200.00 0.00 0.00 144.20 200.00 0.00 N 0.00 E 5993851.58 N 475993.50 E 0.00 0.00 Begin Dir @ 2.0o/100ft (in 12-1/4" Hole)
550.00 7.00 200.00 493.33 549.13 20.07 S 7.30 W 5993831.54 N 475986.13 E 2.00 20.07 Increase DLS to 4.0o/100ft
q--"", 1739.62 54.15 219.30 1490.00 1545.80 488.55 S 357.83 W 5993364.18 N 475634.11 E 4.00 604.26 Base Permafrost
~~"..-y 2086.52 68.01 220.1 0 1657.34 1713.14 721.52 S 551.42 W 5993131.84 N 475439.77 E 4.00 907.16 End Dir; Start Sail
2881 .48 68.01 220.10 1955.00 2010.80 1285.34 S 1026.25 W 5992569.55 N 474963.12 E 0.00 1644.29 Top West Sak
é 4069.96 68.01 220.10 2400.00 2455.80 2128.26 S 1736.14 W 5991728.91 N 474250.53 E 0.00 2746.31 Base West Sak
.. ; 4504.00 68.01 220.10 2562.52 2618.32 2436.10 S 1995.40 W 5991421.90 N 473990.29 E 0.00 3148.78 9-5/8" Csg pt ... Drill out 8-1/2" Hole
4604.10 68.01 220.10 2600.00 2655.80 2507.09 S 2055.19 W 5991351.10 N 473930.27 E 0.00 3241.59 C-80 ( K-1 0 )
"- 8449.94 68.01 220.10 4040.00 4095.80 5234.72 S 4352.34 W 5988630.86 N 471624.37 E 0.00 6807.66 C-40 ( K-3 )
" .-- 11467.86 68.01 220.1 0 5170.00 5225.80 7375.16 S 6154.97 W 5986496.22 N 469814.88 E 0.00 9606.04 Top Morraine
t......--- 12255.72 68.01 220.10 5465.00 5520.80 7933.94 S 6625.57 W 5985938.95 N 469342.49 E 0.00 10336.59 Top HRZ
12763.16 68.01 220.10 5655.00 5710.80 8293.84 S 6928.66 W 5985580.03 N 469038.24 E 0.00 10807.11 Base HRZ
13070.29 68.01 220.10 5770.00 5825.80 8511.67 S 7112.11 W 5985362.79 N 468854.09 E 0.00 11091.90 K-1
13243.89 68.01 220.10 5835.00 5890.80 8634.80 S 7215.81 W 5985240.00 N 468750.00 E 0.00 11252.87 TARGET
13299.98 68.01 220.10 5856.00 5911.80 8674.58 S 7249.31 W 5985200.33 N 468716.37 E 0.00 11304.88 Miluveach
13600.00 68.01 220.10 5968.34 6024.14 8887.37 S 7428.51 W 5984988.12 N 468536.48 E 0.00 11583.07 Total Depth '~
Western North Slope
Measured
Depth
(ft)
100.00
200.00
300.00
400.00
500.00
550.00
a
-.........
-ðc.3
600.00
700.00
800.00
to: >OJ
900.00
1000.00
1100.00
1200.00
1300.00
Incl.
0.00
0.000
0.000
0.000
Azlm.
0.000
0.000
0.000
2.000 200.000
4.000 200.000
6.000 200.000
7.000 200.000
8.893
12.777
16.715
20.676
24.650
28.630
32.615
36.603
1400.00 40.593
1500.00 44.5$~r
1600.00 Aa.57T
1700.0Q"!?2.570
1739.62· ·.':·g;ff53
.,-........
1800.00 .
1900.00
2000.00
2086.52
2100.00
2200.00
2300.00
2400.00
2500.00
2600.00
56.564
60.559
64.554
68.011
68.011
68.011
68.011
68.011
68.011
68.011
26 October, 2003 - 14:31
204.698
209.873
212.653
214.393
215.593
216.477
217.161
217. ~1l'/~
:} 21a.:1;60{ :
21;~.554.·
~t8.889·
.. "219.186
'219.295
219.453
219.696
219.921
220.103
220.103
220.103
220.103
220.103
220.103
220.103
Sub-Sea
Depth
(ft)
-55.80
44.20
144.20
244.18
344.04
443.65
493.33
542.85
641.05
737.74
Vertical
Depth
(ft)
100.00
200.00
299.98
399.84
499.45
549.13
832.44
924/7:'0
>J~14~.è{7 '{h1 0691~7
_<1,1 00:î4:..~eEY 1155.91
'1}ß2.39)''è: 1238.19
'",1
:~ 1260.53
1334.14
1402.86
1466.36
1490.00
1524.32
1576.47
1622.55
1657.34
1662.39
1699.83
1737.27
1774.72
1812.16
1849.60
1316.33
1389.94
1458.66
1522.16
1545.80
1580.12
1632.27
1678.35
1713.14
1718.19
1755.63
1793.07
1830.52
1867.96
1905.40
Sperry-Sun Drilling Services
Proposal Report for 35-24 Plan - 35-24 (wp05)
Your Ref: Revised BHL per Doug Knock (4-17-03)
Revised: 24 April, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
0.00
0.00 N
0.00 N
0.00 N
1.64 S
6.56 S
91.45 S
122.99 S
159.23 S
199.98 S
245.07 S
294.25 S
347.30 S
403.95 S
463.93 S
488.55 S
526.95 S
592.70 S
660.86 S
721.52 S
731.08 S
802.00 S
872.93 S
943.85 S
1014.77 S
1085.70 S
0.00 E
9.96W
18.70 W
31.97W
49.71 W
71.83 W
98.22 W
128.76 W
163.29 W
201.64 W
243.64 W
289.07 W
337.72 W
357.83 W
389.34 W
443.69 W
500.49 W
551.42 W
559.47 W
619.20 W
678.93 W
738.66 W
798.39 W
858.12 W
Page2of9
ConocoPhilfips
Global Coordinates
Northings Eas .
(ft)
D~g;:.~:;Yèrtical
.:..., R~ Section Comment
P~I100ft)
5993851 .58 N
5993836.85 N
5993831.54 N
5993825.17 N
5993808.58 N
5993786.92 N
5993760.29 N
5993728.82 N
5993692.67 N
5993652.01 N
5993607.04 N
5993557.98 N
5993505.07 N
5993448.56 N
5993388.74 N
5993364.18 N
5993325.88 N
5993260.31 N
5993192.33 N
5993131.84 N
5993122.30 N
5993051.57 N
5992980.84 N
5992910.11 N
5992839.37 N
5992768.64 N
475992.90 E
475991.09 E
475988.09 E
475986.13 E
475983.45 E
475974.66 E
475961.32 E
475943.49 E
475921.27 E
475894.77 E
475864.10 E
475829.43 E
475790.91 E
475748.75 E
475703.13 E
475654.30 E
475634.11 E
475602.47 E
475547.91 E
475490.89 E
475439.77 E
475431.69 E
475371.73 E
475311.77 E
475251.81 E
475191.85 E
475131.89 E
0.000
0.000
2.000
2.000
2.000
2.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00 SHL (2565' FNL & 1266' FEL, SEC. 1
T12N - R8E)
0.00
0.00 Begin Dir @ 2.00/100ft (in 12-114" HolE
200.00ft MD, 200.00ft TVD
1.64_'
6.56
14.75
20.07 Increase DLS to 4.0°/1 OOtt : 550.00tt
MD, 549.13ft TVD
26.66
45.01
70.16
102.01
140.39
185.11
235.96
292.69
355.02
422.65
495.25
572.47
604.26
Base Permafrost
653.93
739.23
827.96
907.16
~
End Dir, Start Sail @ 68.011 ° :
2086.52ftMD,1713.14ftTVD
919.66
1012.38
1105.11
1197.83
1290.56
1383.28
DriflQuest 3.03.02.002
Western North Slope
c::>
~o
~J-...:o ~.j
~-~)
.:r..""'ooo:.L :-J!I
."-£.:....~
....
r_ _
u:-i-----·-~
r--
Measured
Depth
(ft)
2700.00
2800.00
2881 .48
2900.00
3000.00
3100.00
3200.00
3300.00
3400.00
3500.00
3600.00
3700.00
3800.00
3900.00
4000.00
4069.96
4100.00
4200.00
4300.00
4400.00',
Incl.
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
Azim.
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
Sub-Sea
Depth
(ft)
1887.05
1924.49
1955.00
1961.93
1999.38
2036.82
2074.26
2111.71
2149.15
2186.59
Vertical
Depth
(ft)
1942.85
1980.29
2010.80
2017.73
2055.18
2092.62
2130.06
2167.51
2204.95
2242.39
2224.03 2279.83
2261.48 231 'h28
2298.92ij~54kK;2 ;:
~;~~;Ø~'~f%§¥:~¥I~~t
, ~,~400:qQ~fJ{:2455.80
~4:11.25'~' 2467.05
.. 2448.69 2504.49
, 2486.14 2541.94
2523.58 2579.38
68.011 220.1 O~
68.011 220}O:r
68.011 220:1,03'
68.011' :,220~t'03
68.011" 220.103
4500.00<6}t011 ' "220.103
4504.00· ,':S8.011 '~;·220.1 03
4600.00
4604.10
4700.00
4800.00
4900.00
5000.00
5100.00
5200.00
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
26 October, 2003 - 14:31
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
2561.02
2562.52
2598.46
2600.00
2635.91
2673.35
2710.79
2748.24
2785.68
2823.12
2616.82
2618.32
2654.26
2655.80
2691.71
2729.15
2766.59
2804.04
2841 .48
2878.92
Sperry-Sun Drilling Services
Proposal Report for 35-24 Plan - 35-24 (wp05)
Your Ref: Revised BHL per Doug Knock (4-17-03)
Revised: 24 April, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
1156.62 S
1227.55 S
1285.34 S
1298.47 S
1369.40 S
1455.43 W
1515.16 W
1574.89 W
1634.62 W
1694.35 W
2128.26 S
2149.56 S
2220.49 S
2291 .4 1 S
2362.33 S
1736.14W
1754.09 W
1813.82W
1873.55 W
1933.28 W
2433.26 S
2436.10 S
1993.01 W
1995.40 W
2504.18 S
2507.09 S
2575.11 S
2052.74 W
2055.19 W
2112.47 W
2646.03 S
2716.96 S
2787.88 S
2858.80 S
2929.73 S
2172.20 W
2231.93 W
2291.66 W
2351.39 W
2411 .12 W
Page 3 019
Global Coordinates
Northings Easti
(ft)
5992697.91 N
5992627.18 N
599~c${5 N
ßgg¿p56.4?N
;~-i~:5992485.TLN
5002414.98 N
5992344.25 N
5992273.52 N
5992202.79 N
5992132.05 N
5992061.32 N
5991990.59 N
5991919.86 N
5991849.13 N
5991778.39 N
5991728.91 N
5991707.66 N
5991636.93 N
5991566.20 N
5991495.47 N
5991424.73 N
5991421.90 N
5991354.00 N
5991351.10 N
5991283.27 N
5991212.54 N
5991141.81 N
5991071.07 N
5991000.34 N
5990929.61 N
474832.10 E
474772.15 E
474712.19 E
474652.23 E
474592.27 E
474532.31 E
474472.35 E
474412.40 E
474352.44 E
474292.48 E
474250.53 E
474232.52 E
474172.56 E
474112.60E
474052.65 E
473992.69 E
473990.29 E
473932.73 E
473930.27 E
473872.77 E
473812.81 E
473752.85 E
473692.90 E
473632.94 E
473572.98 E
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
ConocoPhiffips
Comment
1476.01
1568.73
1644.29 Top West Sak
1661.46
1754.19
1846.91
1939.64
2032.36
2125.09
2217.81
2310.54
2403.26
2495.99
2588.71
2681 .44
2746.31
2774.16
2866.89
2959.62
3052.34
3145.07
3148.77
Base West Sak
9-5/8" Csg Pt ... Drill out 8-1/2" H"
4504.00ft MD, 2618.32ft TVD
9 518in Casing '-"
3237.79
3241.59 C-80 ( K-1 0)
3330.52
3423.24
3515.97
3608.69
3701.42
3794.14
DrillQuest 3.03.02.002
c::>
::J:)
~--~
t!f~<'""
-J.)
""'-=--..-- ~ .::a
~'-
Western North Slope
Measured
Depth
(ft)
5300.00
5400.00
5500.00
5600.00
5700.00
5800.00
5900.00
6000.00
6100.00
6200.00
6300.00
6400.00
6500.00
6600.00
6700.00
Incl.
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
6800.00 68.011
6900.00 68.011
7000.00 68.011
7100.00 68.01l'
7200.00" 68.01:1'
7300.00 .
7400.00,
7500.00'
7600.00
7700.00
7800.00
7900.00
8000.00
8100.00
8200.00
6ß~011
)88:011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
26 October, 2003 - 14:31
Azim.
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
229. :tÔ3;
22q;103
2g0A;o3
2-20.103
220.103
~20.1 03
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
Sub-Sea
Depth
(ft)
2860.57
2898.01
2935.45
2972.90
3010.34
3047.78
3085.22
3122.67
3160.11
3197.55
3235.00
3272.44
3309.88
3347.33
33840£7
Vertical
Depth
(ft)
2916.37
2953.81
2991 .25
3028.70
3066.14
3103.58
3141.02
3178.47
3215.91
3253.35
3290.80
332a~'24:
,:~~65£~8 ".
:{~Ji~~~~
.~
',.,ª422.2.1>i:i[:53478.01
'3459.65 . 3515.45
3497.10 3552.90
3534.54 3590.34
3571.98 3627.78
3609.43
3646.87
3684.31
3721.76
3759.20
3796.64
3834.08
3871.53
3908.97
3946.41
3665.23
3702.67
3740.11
3777.56
3815.00
3852.44
3889.88
3927.33
3964.77
4002.21
Sperry-Sun Drilling Services
Proposal Report for 35-24 Plan - 35-24 (wp05)
Your Ref: Revised BHL per Doug Knock (4-17-03)
Revised: 24 April, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
3000.65 S
3071.58 S
3142.50 S
3213.43 S
3284.35 S
3068.16 W
3127.89 W
3187.63 W
3247.36 W
3307.09 W
4064.52 S
4135.44 S
4206.37 S
4277.29 S
4348.21 S
3366.82 W
3426.55 W
3486.28 W
3546.01 W
3605.74 W
4419.14 S
4490.06 S
4560.99 S
4631.91 S
4702.83 S
3665.47 W
3725.20 W
3784.93 W
3844.66 W
3904.40 W
4773.76 S
4844.68 S
4915.61 S
4986.53 S
5057.46 S
3964.13 W
4023.86 W
4083.59 W
4143.32 W
4203.05 W
Page 4 of9
Global Coordinates
Northings Easti
(ft)
5990858.88 N
5990788.15 N
59§lcr~¥¥'~1 N
5990646.'68..N
IC:-·:5990S75.95.N
5900505.22 N
?#~'~Ji:5990434.48 N
5990363.75 N
5990293.02 N
5990222.29 N
5990151.56 N
5990080.82 N
5990010.09 N
5989939.36 N
5989868.63 N
5989797.90 N
5989727.16 N
5989656.43 N
5989585.70 N
5989514.97 N
5989444.24 N
5989373.50 N
5989302.77 N
5989232.04 N
5989161.31 N
5989090.58 N
5989019.84 N
5988949.11 N
5988878.38 N
5988807.65 N
473213.23 E
473153.27 E
473093.31 E
473033.35 E
472973.40 E
472913.44 E
472853.48 E
472793.52 E
472733.56 E
472673.61 E
472613.65 E
472553.69 E
472493.73 E
472433.77 E
472373.81 E
472313.86 E
472253.90 E
472193.94 E
472133.98 E
472074.02 E
472014.06 E
471954.11 E
471894.15 E
471834.19 E
471774.23 E
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3886.87
3979.59
4072.32
4165.04
4257.77
4350.50
4443.22
4535.95
4628.67
4721.40
4814.12
4906.85
4999.57
5092.30
5185.02
5277.75
5370.47
5463.20
5555.93
5648.65
5741.38
5834.10
5926.83
6019.55
6112.28
6205.00
6297.73
6390.45
6483.18
6575.90
ConocoPhiflips
Comment
~7
'-
DriflQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for 35-24 Plan - 35-24 (wp05)
Your Ref: Revised BHL per Doug Knock (4-17-03)
Revised: 24 April, 2003
ConocoPhiflips
Western North Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Easti Comment
(ft) (ft) (ft) (ft) (ft) (ft)
8300.00 68.011 220.103 3983.86 4039.66 5128.388 6668.63
8400.00 68.011 220.103 4021.30 4077.10 5199.308 6761.35
8449.94 68.011 220.103 4040.00 4095.80 5234.728 6807.66 C-40 ( K-3 )
8500.00 68.011 220.103 4058.74 4114.54 5270.238 6854.08
8600.00 68.011 220.103 4096.19 4151 .99 5341 .15 8 6946.81
-
8700.00 68.011 220.103 4133.63 4189.43 453.99 N 471474.44 E 0.000 7039.53
8800.00 68.011 220.103 4171.07 4226.87 - 988383.26 N 471414.48 E 0.000 7132.26
8900.00 68.011 220.103 4208.52 4264.32 5988312.52 N 471354.52 E 0.000 7224.98
9000.00 68.011 220.103 4245.96 4301.76 5988241 .79 N 471294.56 E 0.000 7317.71
9100.00 68.011 220.103 4283.40 4339.20 5988171.06 N 471234.61 E 0.000 7410.43
C> 9200.00 68.011 220.103 4320.84 4800.36 W 5988100.33 N 471174.65 E 0.000 7503.16
::!:J 9300.00 68.011 220.103 4358.29 4860.09 W 5988029.60 N 471114.69 E 0.000 7595.88
9400.00 68.011 220.103 4395.73 4919.82 W 5987958.86 N 471054.73 E 0.000 7688.61
L.~--,. r.,,~ 9500.00 68.011 220.103 4433.1 J. 4979.55 W 5987888.13 N 470994.77 E 0.000 7781 .33
ç:, ~ 9600.00 68.011 220.103 447qf~2' 5039.28 W 5987817.40 N 470934.81 E 0.000 7874.06
'-
~-~ 0.____">.- -_.:<~ ._::.~::,:7-
9700.00 68.011 220.103 .::4508~d6,.:cIE:)'4563.86 6121.328 5099.01 W 5987746.67 N 470874.86 E 0.000 7966.78
_""- -L ~_____~~ 9800.00 68.011 220.103 :4~i45.5Ô":~; 4601.30 6192.248 5158.74 W 5987675.93 N 470814.90 E 0.000 8059.51
.. ,>J 9900.00 68.011 220.103 4582.95 4638.75 6263.178 5218.47 W 5987605.20 N 470754.94 E 0.000 8152.24
r- 10000.00 68.011 : 220A'O~ .. < 4620.39 4676.19 6334.098 5278.20 W 5987534.47 N 470694.98 E 0.000 8244.96
10100.00; 68.011' 220. iÒ3,' 4657.83 4713.63 6405.028 5337.94 W 5987463.74 N 470635.02 E 0.000 8337.69
10200.00' 6~~O11'" 220.103 4695.27 4751.07 6475.948 5397.67W 5987393.01 N 470575.07 E 0.000 8430.4 1
10300.00 ·'68:0.11 220.103 4732.72 4788.52 6546.86 S 5457.40 W 5987322.27 N 470515.11 E 0.000 8523.14
10400.00" 68.011 220.103 4770.16 4825.96 6617.798 5517.13 W 5987251 .54 N 470455.15 E 0.000 8615.86
10500.00 '< ,. 68.011 220.103 4807.60 4863.40 6688.71 S 5576.86 W 5987180.81 N 470395.19 E 0.000 8708.59 -'
10600.00 68.011 220.103 4845.05 4900.85 6759.64 8 5636.59 W 5987110.08 N 470335.23 E 0.000 8801.31
10700.00 68.011 220.103 4882.49 4938.29 6830.56 S 5696.32 W 5987039.35 N 470275.27 E 0.000 8894.04
10800.00 68.011 220.103 4919.93 4975.73 6901.49 S 5756.05 W 5986968.61 N 470215.32 E 0.000 8986.76
10900.00 68.011 220.103 4957.38 5013.18 6972.41 8 5815.78 W 5986897.88 N 470155.36 E 0.000 9079.49
11000.00 68.011 220.103 4994.82 5050.62 7043.33 8 5875.51 W 5986827.15 N 470095.40 E 0.000 9172.21
11100.00 68.011 220.103 5032.26 5088.06 7114.268 5935.24 W 5986756.42 N 470035.44 E 0.000 9264.94
26 October, 2003 - 14:31
PageS of9
DriflQuest 3.03.02.002
<:::)
=0
~~~~
r~-'"
~ ,"_oj
~...--,
f---
Western North Slope
Measured
Depth
(ft)
11200.00
11300.00
11400.00
11467.86
11500.00
11600.00
11700.00
11800.00
11900.00
12000.00
12100.00
12200.00
12255.72
12300.00
12400.00
L2..
12500.00
12600.00
12700.00
12763.16
12800.0Q.
12900.00<
13000.00,'
13070.29
13100.00
13200.00
Incl.
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
68.011
'6ttQ 11
>68.0'11
68.011
68.011
68.011
13243.89 68.011
Azim.
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
220.103
Sub-Sea
Depth
(ft)
5069.71
5107.15
5144.59
5170.00
5182.03
5219.48
5256.92
5294.36
5331.81
5369.25
5406.69
5444.14
5465.00
5481.5~~
551 ~~q2"
Vertical
Depth
(ft)
5125.51
5162.95
5200.39
5225.80
5237.83
5275.28
5312.72
5350.16
5387.61
5425.05
5462.49 "fJ0k;;;"\'b,)
549~,94?\ J
·552Œ80 ~-
~~~}-l."~~¡i~~
~ -0"-
220.1 03 ~:~~56:~'§~~)t;;5612.26
22(). rQ:r~~·$&.~3.9r· 5649.71
220.t03 c), 56;3.1.35 5687.15
':22(j.~:Ö3., - . 5655.00 5710.80
2g0. H;)~." 5668.79 5724.59
220.103
'·220.103
220.103
220.103
220.103
220.103
5706.24
5743.68
5770.00
5781.12
5818.57
5835.00
5762.04
5799.48
5825.80
5836.92
5874.37
5890.80
Sperry-Sun Drilling Services
Proposal Report for 35-24 Plan - 35-24 (wp05)
Your Ref: Revised BHL per Doug Knock (4-17-03)
Revised: 24 April, 2003
Local Coordinates
Northings Eastings
(ft) (ft)
7185.18 S
7256.11 S
7327.03 S
7375.16 S
7397.96 S
7 S
7933.94 S
7965.35 S
8036.27 S
6532.55 W
6592.28 W
6625.56 W
6652.01 W
6711.74W
Global Coordinates
Northings Easti
(ft)
402.76 N
986332.03 N
5986261 .29 N
5986190.56 N
5986119.83 N
5986049.10 N
5985978.37 N
5985938.95 N
5985907.63 N
5985836.90 N
5985766.17 N
5985695.44 N
5985624.71 N
5985580.03 N
5985553.97 N
5985483.24 N
5985412.51 N
5985362.79 N
5985341 .78 N
5985271.05 N
5985240.00 N
469735.65 E
469675.69 E
469615.73 E
469555.77 E
469495.82 E
469435.86 E
469375.90 E
469342.49 E
469315.94 E
469255.98 E
469196.02 E
469136.07 E
469076.11 E
469038.24 E
469016.15 E
468956.19 E
468896.23 E
468854.09 E
468836.27 E
468776.32 E
468750.00 E
ConocoPhiflips
Comment
9357.66
9450.39
9543.12
9606.04 Top Morraine
9635.84
0.000 9728.57
0.000 9821.29
0.000 9914.02
0.000 10006.74
0.000 10099.47
0.000 10192.19
0.000 10284.92
0.000 10336.58 Top HRZ
0.000 10377.64
0.000 10470.37
0.000 10563.09
0.000 10655.82
0.000 10748.54
0.000 10807.11 Base H RZ
0.000 10841.27
0.000 10934.00
0.000 11026.72
0.000 11091.90 K-1
0.000 11119.45 ---
0.000 11212.17
0.000 11252.87 TARGET: 13243.89ft MD, 5890.80ft
TVD (644' FNL & 1608' FWL, See 25-
T12N-R7E)
Kuparuk
3S-24 (Rev Target), 150.00 Radius.,
Geological
Miluveach
13299.98 68.011 220.103 5856.00 5911 .80 8674.58 S 7249.31 W 5985200.33 N 468716.37 E 0.000 11304.88
13300.00 68.011 220.103 5856.01 5911.81 8674.59 S 7249.32 W 5985200.31 N 468716.36 E 0.000 11304.90
13400.00 68.011 220.103 5893.45 5949.25 8745.52 S 7309.05 W 5985129.58 N 468656.40 E 0.000 11397.62
13500.00 68.011 220.103 5930.89 5986.69 8816.44 S 7368.78 W 5985058.85 N 468596.44 E 0.000 11490.35
26 October, 2003 - 14:31 Page 60f9
8107.20 S
8178.12 S
8249.05 S
8293.84 S
8319.97 S
6771.48 W
6831.21 W
6890.94 W
6928.66 W
6950.67 W
8390.89 S
8461.82 S
8511.67 S
8532.74 S
8603.67 S
7010.40 W
7070.13 W
7112.11 W
7129.86 W
7189.59 W
8634.80 S
7215.81 W
DriflQuest 3.03.02.002
a
~tJ
~ -'~
--~--L:- -:1It
c: .)
i- ~ ==-'
~-'~-,,; --;¡
--- ~- ---"--
~ ------
Sperry-Sun Drilling Services
Proposal Report for 35-24 Plan - 35-24 (wp05)
Your Ref: Revised BHL per Doug Knock (4-17-03)
Revised: 24 April, 2003
Western Norlh Slope
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings EasUngC
(ft) (ft) (ft) (ft) (ft) (ft)
13600.00 68.011 220.103 5968.34 6024,14 8887.36 S 7428.51 W 5984988.12 N
11583.07
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are rela!î¥~¡t()
Vertical depths are relative to RKB = 55,8' M.S.L.. Northings and Eastings are relative t9~"t
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. :.
The Dogleg Severity is in Degrees per 100 feet (US Survey). ~~~;!;?,
Vertical Section is from 2565' FNL, 1266' FEL and calculated along an AZipt}fft€jf'?20,OOOrue),
Based upon Minimum Curvature type calculations, at a Measured.
The Bottom Hole Displacement is 11583.09ft., in the
The Along Hole Displacement is 11586.09ft, the
3°/1 OOft and the Directional Difficulty Index is 6.0.
Comments
Measured
D,~pth
(ft.)
0:00
200.00
550.00
2086.52
4504,00
13243.89
13600.00
26 October, 2003 - 14:31
" ··.·...S't¡¡.tfón Coo r d i nates
., TVD .. Northings Eastings
··,(ft) (ft) (ft)
Comment
·0,00 0,00 N 0.00 E
200.00 0,00 N 0.00 E
549.13 20.07 S 7.30W
1713.14 721.52 S 551.42 W
2618.32 2436.10 S 1995.40 W
5890.80 8634.80 S 7215.81 W
6024,14 8887.36 S 7428.51 W
SHL (2565' FNL & 1266' FEL, SEC. 18- T12N - R8E)
Begin Dir @ 2.00/100ft (in 12-1/4" Hole): 200.00ft MD, 200.00ftTVD
Increase DLS to 4.00/100ft : 550.00ft MD, 549.13ft TVD
End Dir, Start Sail @ 68.011 ° : 2086.52ftMD,1713.14ftTVD
9-5/8" Csg Pt... Drill out 8-1/2" Hole: 4504.00ft MD, 2618.32ft TVD
TARGET: 13243.89ft MD, 5890.80ft TVD (644' FNL & 1608' FWL, See 25-T12N-R7E)
Total Depth: 13600.00ft MD, 6024.14ft TVD (897' FNL & 1395' FWL, SEC. 25-T12N-R7E)
Page 7 of 9
ConocoPhiffips
Comment
Total Depth: 13600.00ft MD, 6024.14'
TVD (897' FNL & 1395' FWL, SEC. 2£
T12N-R7E)
7in Casing
-'
--,'
Dri/lQuest 3.03.02.002
(Q
~'"
C.'
E.-;_",,""; ,.,
~
C~'-~" .
~
y~--
Western North Slope
Formation Toos
Formati on Plane
(Below Well Origin)
Sub-Sea Dip Up-Dip
(ft) Angle Dim.
Profile
Measured Vertical
Depth Depth
(ft) (ft)
Sperry-Sun Drilling Services
Proposal Report for 35-24 Plan - 35-24 (wp05)
Your Ref: Revised BHL per Doug Knock (4-17-03)
Revised: 24 April, 2003
Penetration Point
Sub-Sea
Depth Northings
(ft) (ft)
1490.00 0.000 0.000 1739.62 1545.80
1955.00 0.000 0.000 2881 .48 2010.80
2400.00 0.000 0.000 4069.96 2455.80
2600.00 0.000 0.000 4604.10 2655.80
4040.00 0.000 0.000 8449.94 4095.80
5170.00 0.000 0.000 11467.86 5225.80
5465.00 0.000 0.000 12255.72 5520.~,~
5655.00 0.000 0.000 12763.16 571 Oia~
5770.00 0.000 0.000 13070.29 "~g§.~~,
5835.00 0.000 0.000 13243.89è ;\':>589ø.~~1,
-
5856.00 0.000 0.000 t3~Ø9.9ft. '5911.80 5856.00
~ --~
CasinQ details"
Fir:,Q m
Meatillrêd'· Vertical
Depth De;pth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
<Surface> <Surface> 4504.00 2618.32
<Surface> <Surface> <Run- TD> <Run- TD>
26 October, 2003 - 14:31
8674.58 S
Casing Detail
9 5/8in Casing
7in Casing
Page 80f9
ConocoPhiffips
Base Permafrost
Top West Sak
Base West Sak
C-80 (K-10)
C-40 ( K-3 )
-
6154.97 W Top Morraine
6625.56 W Top HRZ
6928.66 W Base HRZ
7112.11 W K-1
7215.81 W Kuparuk
7249.31 W Miluveach
-'
DriflQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for 35-24 Plan - 35-24 (wp05)
Your Ref: Revised BHL per Doug Knock (4-17-03)
Revised: 24 April, 2003
Western North Slope
Targets associated with this welloath
Target Name
38-24 (Rev Target)
a
:='?~l
~ 1
~.--~~..
26 October, 2003 - 14:31
Page90f9
ConocoPhiflips
oordi'nates
hgs Eastings
) (ft)
Target
Shape
Target
Type
8634.80 8 7215.81 W
5985240.00 N 468750.00 E
70022' 14.6250" N 150015' 14.2747" W
Circle
Geological
-'
~
DriflQuest 3.03.02.002
Plan: 3S-24 (wp05) (Plan: 3S-24/Plan: 3S-24)
r--\
Ë
34.8-~-;----
32.O--=-~-
30.0-=:>-- .-
¡::::
.9
......
~
;....
~
0..
()
r/).
() 18'(~ -~--
;....
......
¡::::
~ 16.0-=:~~-
~-10
--~-Cc. "......
=- ~()
C~'-b
~,,-,-' ..J ¡::::
"'" ()
-,-.'''''':U
10.0-=-
-~~~
if--
4.0-=:: - - n
2.0
0.0 -11111 ¡ II1I i IIII II11I1111
-300 -250 -200 -150 -100
Measured Depth [ft]
35-14 (38-14)
38-21 (38-21)
38-26 (38-26A)
Plan: 38-13 (35-13 (BHL 19))
Plan: 38-19 (Plan 35-19F)
38-15 (35-15)
38-22 (35-22)
Plan: 35-01 (Plan: 38-01 (BHL-127t'--
Plan: 38-17 (35-17 (Rig))
Plan: 35-19 (Plan: 38-19)
35-16 (35-16)
35-23 (35-23)
Plan: 35-03 (Plan: 35-03 (BHL 12»--
Plan: 35-17 (Plan: 35-17)
Plan: 35-20 (Plan: 35-20)
35-18 (35-18)
35-26 (35-26)
Plan: 38-12 (Plan: 35-12)
Plan: 35-17 (Plan: 35-17F)
çompany:
. Field:' .
R,efer~ncé Site:
. R.éfere~ceWéll:
Refer~n:ceWellpath:·
Phillips Alaska. Inc~
Kuparuk .River Unit
KlJþaruk 3SPad '
Plan: 38-24
Plan; 38-24
)
')
SPERRY_SUN HES
Anticollision Report
NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Interval: 25.00 ft
Depth Range: 28.10 to 13600.00 ft
Maximum Radius: 1557. 19 ft
Survey Program for Definitive Wellpath
Date: 5/15/2002 Validated: No
Planned From To Survey
ft ft
28.10 750.00
750.00 13600.00
Casing Points
Planned: 3S-24 (wp05) V10
Planned: 3S-24 (wp05) V10
MÞ TVD '))iani~te'r Hole Size
f,t ' ft in in.
4504.00 2618.31 9.625 12.250 95/8"
13600.00 6024.12 7.000 8.500 7"
Date: 1 0/26/2003
Time: ··15:10:32
.Page:
1
Co~ordlnate(NE)· Reference:
V~rtical (TVD) Reference:
Well: Plan: 38"24,True Nôrtn
RK~=~5.8' MSL,55;8 .
Db~ Oracl'e
Reference:
Error Model:
Scan Method:
Error Surface:
Principal Plan & PLANNED PROGRAM
18CW8A Ellipse
Trav Cylinder North
Ellipse + Casing
Version: 7
Toolcode
Tool Name
CB-GYRO-S8
MWD
Camera based gyro single shot
MWD - Standard
Summary
<-""77~·~·~::'·_~·J·_--~ . Qff~et Wellpath . ~-~~--_::'_--·-'~·7--~~·~>
'Site ...: . . Well . " W~lIpath
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 3S Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 38 Pad
Kuparuk 3S Pad
38-14
3S-15
38-16
38-18
3S-21
3S-22
3S-23
3S-26
38-26
Plan: 3S-01
Plan: 3S-03
Plan: 38-12
Plan: 38-13
Plan: 38-17
Plan: 38-17
Plan: 38-17
Plan: 38-19
Plan: 38-19
Plan: 38-20
38-14 V2
38-15 V4
38-16 V4
38-18 V4
38-21 V4
38-22 V1
38-23 V4
38-26 V2
38-26A V3
Plan: 3S-01 (BHL-12) V
Plan: 38-03 (BHL 12) V
Plan: 38-12 V2 Plan: 3
38-13 (BHL 19) V1 Plan
38-17 (Rig) V2
Plan: 3S-17 V1 Plan: 3
Plan: 3S-17F V1 Plan:
Plan 3S-19F V3 Plan: 3
Plan: 3S-19 V1 Plan: 3
Plan: 38-20 V1 Plan: 3
Ref~r~rice .. Offset , Ctr~Ctr No-Go· , AlloWable
'MD 1.I\1D Distance Area :ÓeviaÙ~ri.,
ft ft .·.···ift ft 'ft,
248.00 250.00 200.28 4.33 195.95 Pass: Major Risk
367.56 375.00 180.65 5.62 175.06 Pass: Major Risk
247.66 250.00 161.04 4.58 156.45 Pass: Major Risk
563.03 575.00 114.81 8.63 106.40 Pass: Major Risk
569.84 575.00 61.67 9.20 52.47 Pass: Major Risk
223.50 225.00 41.45 4.19 37.26 Pass: Major Risk
324.88 325.00 22.14 5.24 16.91 Pass: Major Risk
620.78 625.00 24.42 8.88 15.64 Pass: Major Risk
620.78 625.00 24.42 8.88 15.64 Pass: Major Risk
268.93 275.00 460.63 4.70 455.93 Pass: Major Risk
269.41 275.00 420.75 4.71 416.05 Pass: Major Risk
800.00 850.00 224.74 14.53 210.80 Pass: Major Risk
247.97 250.00 220.47 4.96 215.51 Pass: Major Risk
296.93 300.00 141.33 5.18 136.16 Pass: Major Risk
537.96 550.00 139.98 9.53 130.48 Pass: Major Risk
537.96 550.00 139.98 9.19 130.84 Pass: Major Risk
564.75 575.00 96.25 9.52 86.80 Pass: Major Risk
564.75 575.00 96.25 9.52 86.80 Pass: Major Risk
949.67 975.00 75.15 17.73 60.61 Pass: Major Risk
OR !.. .,0, ~ 'I '. ...~ I
r¡" " "~I 1
~ l...~1 h: J .~'
., .. ¡ \.1;1 I J'~I J .: ;~
WflLP ATH DETAILS
Plan: 3S·24
Ri.2: N7ES
Rei. DatwÌÍ: RKB = 55.S' MSL 55.8Oft
V.Section oæm ~~ ~~m"¥-VD
Angk +N]:s
227.3f1" 0.00 0.00 0.00
COMPA.'<Y DETAILS
P~~~2Inc-
Kúporuk -
CalcuJ>.tionMtthod: Mirrirrnm eurrature
~;~;;¡"":f: ~;v~~" North
fuor Surface.: Ellipticol + Casing
W~}"fê.thod: Ru~Basoo
3S-24 (wp05
ANTI-COLLISION SETTINGS
Interval: 25.00
To: 13601
Reference: Plan:
Interpolation Method:MD
Depth Range From: 28.10
Maximum Range: 1557.19
Slot
SJA
l<>ng¡:ud.
150'1l·43.16-lW
Latirud
70'23'39.59OS'
WELL DETAILS
NortlUlg Eostin
5993851. 475993.50
+r.¡·w
-16
.Sf
7.
:S-:ure
-'
-"
ToMD
500
750
1000
1500
2000
2500
3000
3500
4500
5500
6500
7500
8500
9500
11500
13500
15500
17<;f\{)
(3S-23
Colour
90
From
o
500
750
1000
1500
2000
2500
3000
3500
4500
5500
6500
7500
8500
9500
11500
13500
15500
--22.
-20.0
-0
-5.0
-15.0
-10.0
-10.0
-15.0
-5.0
ToMD
500
750
1000
1500
2000
2500
3000
3500
4500
5500
6500
7500
8500
9500
11500
13500
15500
17500
Colour
Fr
Tool
CB-GYRO-SS
MWD
SURVEY PROGRAM
SurveylPlan
Depth To
750.00
13600.00
Depth Pn
28.10
750.00
Planned: 3S-24 (wp05) V 10
Planned: 3S-24 (wp05) VIO
\ \
~~
\'\~ ~
'-~--------
----
270
-105
-100
-50
-"
~O
-75
-25
- )
-'f.5
-75
C>
~~.'.~
~~-:;:- -:..~
......::.:- ,
!~~
!;
d
18r!1.
35-24 (wp05)
Approved Plan
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [10ft/in]
-20.0
--22.1
Target
Centre Separation [50ft/in]
VSee
0.00
0.00
18.98
89-1.55
TFace
0.00
0.00
200.00
2l.27
0.00
0.00
DLeg
0.00
0.00
2.00
-1.00
0.00
0.00
Centre to
+E/-W
0.00
0.00
-7.30
-551.-11
-7215.76
-7-128.-17
100
o~cl°~
SECftO:-¡ DEL\ILS
+;\/-S
VS
[ deg]
0.00
0.00
-20.07
-721.52
-863-1.85
-8887.-12
(TFO+AZI
lVD
28.10
200.00
5-19.13
1713.1-1
5890.78
602-1.12
Azj
0.00
0.00
200.00
220.10
220.10
220.10
Travelling Cylinder Azimuth
n
0.00
0.00
7.00
68.01
68.01
68.01
MD
28.10
200.00
550.00
086.52
2-13.89
600.00
See
-100
-105
)
)
35-24 Drillina Hazards Summary
12-1/4" Hole / 9-5/8" CasinCllnterval
J._ Risk Level
Low
Event
Broach of Cond uctor
Gas Hydrates
Gravel/Sand Sloughing to
500'
Hole Swabbing/Tight Hole on
Trips
Possible thaw bulb / water flow
around 1200'
Lost Circulation
Low
Moderate
Moderate
Low
Low
8-1/2" Hole / 7" CasinCllnterval
Event
Shale stability in HRZ, K-1, and
Miluveach
High ECD and swabbing with
higher MW's required
Barite Sag
Differential Sticking
Abnormal Reservoir Pressure
Lost Circulation
Risk Level
Low
Moderate
Low
Moderate
Moderate
Moderate
___ Mitigation Strat~gy
Monitor cellar continuously during interval.
If observed - control drill, reduce pump rates,
reduce drilling fluid temperatures, Additions of
Drilltreat.
Increase mud weight / viscosity, High viscosity
sweeps. Monitor fill on connections
Circulate hole clean prior to trip. Proper hole fill
(use of trip sheets), Pumping out of hole as needed.
Watch return viscosity for signs of thinning.
Increased mud weight/viscosity as needed.
Prevent by keeping hole clean. If losses occur-
reduce pump rates and mud rheology, use LCM
I Mitigation Strategy
Control with higher MW and proper drilling
practices.
Condition mud prior to trips. Monitor ECD's with
PWD tool while drilling across pay interval. Pump
and rotate out on trips as a last resort.
Good drilling practices as documented in well plan.
Periodic wiper trips. Do not leave pipe static for
extended period of time.
Follow mud weight schedule and do not fall behind.
Stripping Drills, Shut-in Drills, PWD Tools, Increased
mud weight as needed. Ensure adequate kick
tolerance prior to drilling pay interval.
Use PWD to monitor hole cleaning. Reduced pump
rates, Mud rheology, LCM. Use GKA LC decision
tree.
3S-24 Drilling Hazards Summary. doc
prepared by Scott Lowry
7/30/02
OD8.t"" .,,~ '~L
' :, f: ': .J ~
t @ # ~".;, ;", 1 \ I, .
, ¡¡j """~ I i v. J 1 '
Page 1 of 1
KRU - 35-24 ProliJcer
Proposed Completion Schematic
Single Completion wI Jet Pump Contingency
16"x30"
insulated Ii
conductor @ ~
+1- 109' MD I
~ r1i
TAM 9-5/8" PorW ~. j
Collar Stnd R
Grade BTC ~
Threads (+/- ~
1000' MDfTVD) I
Surface csg. I
9-5/8"40# L-80 ...J
BTC (4504' MD /
2618' TVD)
Casing point
100' above the
C80 sand
C
Sand Perfs
(to be done
after rig moves
off)
Production csg.
7" 26# L-80
BTCM (+/- 13600'
MD)
~ I?~ i
I .. II L
! I ~,
~ ¡
! I ~
I ~ I
'- ~ I
~ ~ Ia.-
~ I
~ ~
~ I
~ ~
~ ~
~ ~
~ I
i ~
~ i
~ ~
~ ~
~ fI:
~ ~
~ ~
i ~
~ ~
~ ~i
I
~
~ I
~ ~
~ I
~ ~
i ~
~ ~
~ I
~ ~
I ~
~ - ... ~
1-iiJ
~ ~
~ ~
~ ~
~ ~
i = ~
~ ~
~ . ~
~ . ~
~ ~
~ ~-'-'--'-
7 ---
r
..--.
1o-- -
r-
~
~
~
~
~
~
~
~
:¢~~~t ~
~
J
: i
u'"i
~
~
i
~
~
~
~
~.
~ .
I'
~ .
~
)
ConocÓPhilUps
3-1/2" FMC Gen Vtubing hanger, 3-1/2" L-80 EUE8RD pin down. Special Drift 2.91"
3-1/2", L-80, 9.3# EUE8RD Spaceout Pups as Required. Special
Drift 2.91"
3-1/2" Cameo DS Landing Nipple with 2.875" ID No-Go profile set @ +/- 500' MD.
Use of port collar at the discretion of the drilling team.
GLM Placement:
Valves #1-4: 3-}'2" x 1" KBUG
Place gas-lift mandrels at the following depths:
TVD Approximate MD
Placement TBD
Valve #5: 3-1/2" x 1-1/2" 'MMG' GLM wI DCR Dump Kill Valve (3000 psi casing to tubing
shear). 6' L-80 handling pups installed on top and bottom of mandrel.
1 Joint 3-1/2", L-80, 9.3# EUE 8rd Mod Tubing.
3-1/2" Baker 'CMU' sliding sleeve w/2.813" Cameo No-Go profile, EUE8RD
box x pin. 3-1/2" x 6' L-80 EUE8RD handling pups installed above
1 Joint 3-1/2", L-80, 9.3# EUE 8rd Mod Tubing.
6' Handling Pup Joint 3-1/2", L-80, 9.3# EUE 8rd Mod Tubing.
Baker '80-40' PBR.
Baker 7" x 3-1/2" 'SAB-3' Permanent Packer set +1- 100' MD above top planned perf.
Minimum ID through the packer 3.00".
6' Pup Joint 3-1/2", L-80. 9.3# EUE 8rd Mod Tubing.
3-1/2" Camco 'D' nipple w/2.75" No-Go profile.
6' Pup Joint 3-1/2", L-80, 9.3# EUE 8rd Mod Tubing,
Baker 3-1/2" WL Re-entry Guide wI shear out sub. Tubing tail 50' above top planned perforation.
TD @ 13600' MD /6024' TVD
(300' MD below Miluveach)
Scott L Lowry 4/25/03
n''''~ .1 ., " J ...i~ .L
:~l {".~ i "', jf ,/ :,
i'~C"'"'~~.CC~'" '(""co."'V.~c"'<KC(.~W'!r'S'''':',~·V2~",,c·'~:'5q~ª,~i"é'"~.~'X·f'""j',,"f,r~>,.;>;q;.,,,Cc; ."."'~"".;?":'",",o,?!'.ffi"i~"""'''''.~·k~':''''·:?~'''..<·'·'.··':~=~="~="'0
i s. K. AllSUP-DRAKE 1 037 ~
I." PHllll.PS P.E. TROLE.U. M COMPANY . ~!
: 700 G ST. ATO 1530 /h, ·f? a 2a!. ~
I ANCHORAGEAK 99501 ... DATE' 't't ~ ~ 62·'4/311 ~
II .~~~~~ó':.E '5'r.It.<r. eop .4~..KA...~....· ..~.G.C I $ (lXI.oo. ~.i.;.:
~I ____ /.11 ð. J! .. Ii... ... ... . I .. A-.: /J /'k4ÞIrØ4 __ ^ =,oryO, ~.'7'
« (.J,/~ ~. q.., ,( . (' DOLLARS l!J o.'''''~",", ~
il. . ~... CHASE Chase Manhattan Bank USA, N,A. Valid Up To 5000 Dollars ~
I u _W"~,..,,_~.,~...n'" (// <;) / ;
I MEMO 35~vI _Zlw-A- dÍÍ¡-U-li'fP I
I 1:0 j ~ ~ 00 ~ 1..1.1: 2 ~8oooo'" 2 7 2 5 711- ~o 3 7 ~
~;"'_-:J~~-e~_-::,~~),.;..::'--_~,}:_F=+._ <'.~7~:-i"<:S~O"?::"-~~-"",,-i'~:,:,,":-?_¿;-:::~_-~~:':.,....~2><-~--_"~-~-;_',-'O}~'?~:?~~~-";-_::"~}:'7_~,t~-~~~~~¿~J!f~~~~~~~~?--?:-:-~'lf~-r~~.:~~r~--O:!fY-~~~~Þ;f<~~!.-,---n:~~:":7""'7'"" --;
-.
I?~c
41' ~/V~/'
44 IL ~ .2 0 V
~""8 0/, 0 ?¿?,'O
~~,.. 'J
Uqs ~
4. o/J.,r
~~hol"8. . COIJ}IJl' .
rle ~SJ'IO/J
)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME ;¿'2¿{...Jà - 21
PTD# 20 g -0 /7
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(H API number
last two (2) digits
are between 60-69)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to· be reported as
a function· of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(t), all·
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\j ody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
'M!!?g~B:,ª~r~lIIlç:M,ª~~~.~ª~ Company _C_QbtO_C.QEHtLLte_S_ALA$J:ÇAJt~tÇ _._._._.__. Well Name: KU£ARu..~J3Jy_u..~LT_3_S~2~
PTD#: 2030790 Field & Pool JSUeARUK.RIY.ERJ~UJ~ARU~J3V_QLL-:_~t90J.o_O Initial ClasslType ._QE..\LL1:.0J.L_. GeoArea .8_9_0
Administration 11 P!:!(mitfee. attached. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Y!:!s . . . _ . . . . . . . . . . . . . . . . . . . . . .
¡2Leas!:! numbe.r appropriat!:!. . . . . . . . . . . No. . Cor(ection .n!:!eded:. Surtace Ipcation in ADL .380t07;.top productjv!:! jn.te.rvaJ and. TD. in ADL 255.5:1.. . . . .
13 .U..ni.ql,1e. we.ltn.ar.:n!:! .alJd Iwmb.!:!( . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Y.!:!$ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
\4 WeJI Jo.cat!:!d in.a.d.efilled pool. . .. . . . . . . . . . .. . . . . . . . . . . . . . . . .Y!:!s . . . . . . . .. . . . . . . . . . . . . .
15 WeJIJo.cated prppe.r distance. from. drilling unit.bpundary. . . . . . . . . .Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16 WeJIJo.cat!:!d prppe.r distance. from. o.the.r wells. . . . . . . . . . . . . . . . . . . . . . . . . .Yes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 .S!Jfficient acreag.e.ayailable i.n.drilling unIt. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Y!:!$ . . . . . . . . . . . . . . . . . . . . . .
8 .If.d!:!viated, is.weJlbo.re. plaUncluded . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes. . . . . . . . .. . . . . . . . . . . . . . . .
9 .oper.ator only affected pa.rty. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10 .Oper.ator bas.appropriate.b.olJd in JQrce. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes. . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11 P!:!(mit.cao be i.s$u.ed witho.ut conse.rvation orde.r. . . . . . . . . .. . . . . . . . . . . . . . . . .Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12 P!:!r:.mit.c.ao be i.ssu.ed witho.ut ad.milli~tr:.ativ.e.apprpvaJ . . . . . . . . . . . . . . . . . . . . . . . . . .Yes. . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
51712003 13 Can permit be approved before 15-day wait Yes
14 WeJIJo.catedwithinareaan.d.strataauthorizedby.lojectiol'JOr:.der:.#(puUO#in.commeots).(For. NA............................................................................
15 All wells.witþin.1l4.mil.!:! .are.a.of r:.eyiew ideotified (For:. ~ervjce W.!:!IJ Ollly). . . . . . . . . . . . . . . NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . .
16 Pre.-produçed. ilJjectQr~ duratio.n.of pre-p(oductionl!:!ss.tban.3.mOllths.(For.seryice well. o.nly) . . NA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . .
17 ACMP.F.in.ding.otCo.n.si.slelJcy.ha$ be.en.is.sue.d.for.tbis prpiect . . . . . . . . . . . . . . . . . . . NA . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appr
SFD
Date
Engineering
Appr Date
TEM 5/2/2003
Geology
Appr Date
SFD 5/7/2003
Geologic
Commissioner:
0S-Þ1J'
_ Program P-EY._._____._.___
Unit jJJ.ftO__~ On/Off Shore Qo.___...
[J
D
Well bore seg
Annular Disposal
- - - - - - - -
- - - - - .
- - - - - - - -
- - - - - - - - -
- - - - - -
{
18 CpOduClo( str:.in.9.PJo.vided . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19 .Sur:face.casjng.PJQtects.all.known.USQWs...... _ . . . . . . . . _ . . . . . . . . . . . . . . .. NA . . . . . _ _Altaquife.rsexelJ1pt~d,.40.CFR1~7.1Q2.(b).(3). . . . . . . . . . . . . . . . . . . . _ . _ . . . . . . . . . . . . . . . . . .
20 .CMTvoLa.dequ.ateJo circ!Jlate.on .colld.uctor.& su.rf.csg . . _ . _ . _ _ _ _ . . . . . . . . . . . . . . Yes. . . . . . . _ . . . . . . . . . . . . . . . . . . _ . . . . . . _ . _ . . . . . . . . _ . _ . . _ . . . . . . _ _ . _ . . . . . . . . _ . . . . . .
21 .CMTvpl.a.dequ.ateJo tie.-in Jo.ng .slrilJg lo.surf CS.9. . . . . . . . . . _ _ . . . . . . . _ _ . . . . _ . . N.o. . . . . . . _ Ann.ular:. disp.psal ultimately plaon.ed._ TOC pl.alJned .to. tpp 9f.HRZ. with_gayge.h_ole.. . . . . . _ . _ _ . . . . . . . . . .
22 CMTwill coyer _all known .productiye. bo.ri¡Qn.s. . . . _ . . . _ _ . . . . . . . _ . . . . . . . . . _ . . Yes . . . _ . . _ . . . . . _ . . . _ . . . . . . . . . _ _ . . . . . _ _ . . . _ . . . . . .. . . . . . . _ . . . . . . . . . . _ . . _ . _ . . _ . . . .
23 _Casiog de.sigos ad.equate.. for:. C,.T. B .&.p.ermafrpst. . . . _ _ _ . . . . . . . . . . . . . . . _ . . . . .Yes. . . . . _ . . . . . _ . _ _ . _ . . . . . . . . . _ . . . . ._ . . . . . . . . . . . . . _ . . _ . . . _ _ . _ . . . . . . . . . . . . . _ . . . .
24 Adequale.tankag.e_oJ re.serye. pit. . . _ . . . . . _ . . . _ _ . . . .. . . . . . . . . . _ . . . _ . . _ . .Yes. . . . . . . Rig equJpped with $tee..1 pits, NpJe.s!:!r:ve pit plç¡l1.n~d.. OrjlHng waste to.C!Ppr.ove.d.anlJulus.o.r Class IJ well.. . . . _ . .
25 Jf.a.re-çlr:.ill. bas.a. 1.0:-4.03 fo.r aba.ndon.menl Þ.e~o apPJo.ved . . . . . . . . . . . . . . . . . . . .. _ . NA _ _ . . . .. _ _ _ . _ . . . _ . _ . _ . . . . _ . . . . _ . . . . . . . . . . . . . . . . . . . . . _ _ . . _ . . . _ . _ . . . . . . . . . _ . . _ .
26 Adequale w.etlb.ore. s.eparatjon propO$ed. . . . . . . _ . . . . . . . . . . _ . . . . . _ . . . . . . . . _Yes. _ . _ . . . Close_appr.oç¡ch~s identifie.d. and .magoe..tic inte.rfer.aIJGe. c.atcylç¡ted.. GyrQs.lTlay.b.e.e.rnp!oye.d. . . . . . . . . . . . . .
27 .If .djver:te.r Je.q.\,Jire.d. do..es it me~l reguJa.tiolls. . . . . . . . . . . . . . _ . . . . _ _ . . . _ . . . . . . NA . . . . . . _ Th.is. is th~ .3 rd. weJlp(opos.ed to. drill witho.ut a dive.rt!9r:.. .S.halJoW.g.a$ bas. n.ot be.en see.n.at 35.. . . . . _ . . _ . _ _ .
28 .PrilJiog fluid_pJogra.m schemati.c.&. e.quip Jist.adequate. . . . _ _ _ .. . . . . . _ . . . . . _ . . . . . Yes. . _ . . . .. Expected. BH~ 1. t t EMW.. Mud weigbtplanoe.d. to :1 1.6 ppg.. . . . . . . _ . _ _ . . . . _ . . . . . . . . .. _ . . . _ . _ .
29 .BOP !::$ , .dp .th.ey meet. reg uJ a.ìi 0 11. _ . . . . _ . . _ _ . . . . . . . . . . . . . . . . . . _ . . . . . . . . Yes. . . _ . . . . . . . . . . . . _ . . _ . . . _ _ . _ . . _ .. .. _ _ . _ _ . . . . _ . _ . _ . . _ _ . .. . . . . . . .. . . . . _ . . . . . . . .
30 .BOP!::.pre.ss ratiog app(opr:.iC!te; te.stlo.(put p$ig in .comments). . . . . . . __ . . .. ...... .Yes ...... MA$P ca.lcutate.d.at 27.69 psi.. 350_0.p.si.a.cce.pta.ble, althougþ PPCo !Jsu.atly.t!9sts t.o.500Q psL . . . . . . . . . . _ .
31 .Choke.manifQld co.mpJies. w/AI?I.RP-53_ (M.ay 64). . . . . . .. . . . . . .. . __ . . _ . . . . . . . . .Y!9$ .. _ . . . . . . . . . _ . . . . . . . _ . . . . . . . . .. _ . . . _ . . . . _ . . . _ .. .. _ . . . ._ . . . . . .. . . . . . . .
32 Wo.rk wit! OGC!Jr:. wit.hout .ope.rç¡tion .sbutdown. . . . . . . _ _ . . . . . . . . . _ . . . . _ . . _ . . . . .Yes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . .. . . . . . . . . . . . . . _ _ . _ . . . . . . . . . . . . . . . . _
33 Js_ pres.ence_ oJ H2S gas. prob.able. . _ . .. . .. . . . _ . . _ . . . . _ . . .. . . . . . . . . . _ . . _ _ _ No. . . . _ . . . . _ . _ . . . _ . . . . . . . . .. . . .. . . . . . .. . . . . . _ . . . . . . . . . . . . . . . _ . . . _ _ . . . . . _ . _ . . . . . . .
34 Mecha.ni.cç¡l.cPlJdjti.on of weJls withJn. AQR ye.rified. (For.se(Vice W!91J onJy). _ . . . . . . . . _ _ . . NA. .. . . . . . _ _ . . _ . _ . . . . _ . . . .. . . . . . _ _ . . . . . . . . . _ . . _ . . . . . . . _ . . . _ . _ . . . _ . . . . . _ . . . .
35 Per:.mitc.ao be i.ssu.eçj wl.o. hyç:rpge.n.s.uIJide. meaS!Jr:.e$. .. . . _ . . . . . . _ . .. . . _ . . . . _ . . . .Yes. . . ._ . . May. 7., 2QQ3; .SCqtt L,owry. COllocoPh..: .H.2$ .hßS oo.t bee..n.oÞse..r\led.ill any .pfthe 3S-Pad well.s to. date.. . . . _ . . _
36 .Data.PJe..selJted. Qn. pote.nt.ial overpres.sljre zon.e.s _ . _ _ . . . . . . .. . . . . . . . _ . _ . _ _ . . . . .Yes . . . . . . . Expected. pres.sure .in_ Kup. C sa.nd is .1.1 ..9.ppg EMW .. . . . . . _ _ .. . . .. . . . .. . . . . . . . . . . . . .
37 .S!:!i.smic.analysjs.oJ $haJlow gas.zooe.s. . . . . . . _ . _ . . _ . . _ . . . . . . _ . . . . . . . . . . . NA . . . . . . _ . . . . . . . . . . .. . . _ . .. . . . . . . _ . . . . . . . _ . . . . . . . . . . .. _ . . . .. . . . . . . . . . . _ . . . . . . . . . .
38 .S!9aÞ.ed cQnditioo $u.rvey .(it Qff-~hor:.e) . _ . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . NA . _ . _ . . . . . . . . . . . . . . _ . . . . .. _ . . . .. _ . _ . . . . . . . . . . . . _ . . . . . . . . . . . . . _ . . . . . . _ . _ . .
39 . Co_ntact. narn.elphon.eJor .weekly progres.s.reports [e~pIQratpry .only]. . . .. . _ _ _ . . . .. . _ . . . NA _ . . . . _ .. .. . _ . . . . . . _ _ . . . . . _ . .. . . . . . . . . . . . . . _ . . . . . . . . . . . . . . _ . . . . . . .
(
Date:
as]Q81oJ
Engineering
Commissioner:
Date
Public
Commissioner
Date
~
5)¿YD3
)
')
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Pennitting Process
but is part of the history file.
To improve the readability of the Well History file and to
sim,plify finding infomlation, infomlation of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
.,
Sperry-Sun Dz )ing Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Jun 18 14:22:30 2003
') d,03 -- 01t4
\ \ ~ 3'1
Reel Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/06/18
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/06/18
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Kuparuk River Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
3S-24
501032045600
ConocoPhillips Alaska, Inc
Sperry-Sun Drilling Services
18-JUN-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
MW0002449740
E. QUAM
D. BURLEY
MWD RUN 3
MW0002449740
E. QUAM
D. BURLEY
MWD RUN 4
MW0002449740
E. QUAM
D. BURLEY
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 5
MW0002449740
E. QUAM
D. BURLEY
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
18
12N
8E
2565
1266
56.08
27.70
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
BIT S ) (IN) SIZE (IN) DEPTH (FT)
8.500 9.625 4527.0
)
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 WAS DIRECTIONAL ONLY - NO DATA ARE
PRESENTED.
4. MWD RUNS 2 - 5 COMPRISED DIRECTIONAL WITH DUAL GAMMA
RAY (DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS¡ ELECTROMAGNETIC WAVE
RESISTIVITY -
PHASE 4 (EWR4) ¡ COMPENSATED THERMAL NEUTRON POROSITY
(CTN) ¡ STABILIZED
LITHO-DENSITY (SLD) ¡ ACOUSTIC CALIPER (ACAL) ¡ AND
PRESSURE WHILE
DRILLING (PWD). 20' WERE DRILLED IN RUN 2 BEFORE
POOH TO PERFORM
A CEMENT SQUEEZE. ONLY SROP AND SGRC DATA ARE
PRESENTED FOR THIS RUN.
5. MWD DATA ARE CONSIDERED PDC PER E-MAIL AUTHORIZATION
FROM THE GKA
GEOSCIENCE GROUP.
6. MWD RUNS 1 - 5 REPRESENT WELL 3S-24 WITH API#:
50-103-20456-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF 13656'MD /
6068'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP).
TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE
MATRIX, ACAL-DERIVED
HOLE SIZE) .
CTFA SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE.
CTNA SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN) .
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) .
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR (LOW-
COUNT BIN) .
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
SLDSLIDE = SLIDE INTERVAL ADJUSTED FOR THE SLD
SENSOR-TO-BIT DISTANCE.
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: ACAL-DERIVED (8.5" BIT)
MUD WEIGHT: ') - 11.7 PPG )
MUD SALINITY: 600 - 1000 PPM CHLORIDES
FORMATION WATER SALINITY: 25000 PPM CHLORIDES
FLUID DENSITY: 1.0 G/CC
MATRIX DENSITY: 2.65 G/CC
LITHOLOGY: SANDSTONE
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
PEF
NCNT
FCNT
GR
NPHI
FET
RPD
RPM
RPS
RPX
ROP
DRHO
RHOB
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
4495.0
4499.0
4499.0
4506.0
4525.0
4530.5
4530.5
4530.5
4530.5
4530.5
4537.5
4537.5
4537.5
STOP DEPTH
13581.5
13568.0
13568.5
13624.5
13568.0
13617.0
13617.0
13617.0
13617.0
13617.0
13656.0
13581.5
13581.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH -------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
2
3
4
5
MERGED MAIN PASS.
$
MERGE TOP
4506.0
4557.5
12105.0
13358.0
MERGE BASE
4557.5
12105.0
13358.0
13656.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing. ................... .60 .1IN
Max frames per record............ . Undefined
Absent value...... . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
) )
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CNTS 4 1 68 36 10
NCNT MWD CNTS 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 4495 13656 9075.5 18323 4495 13656
ROP MWD FT/H 0.83 397.55 196.389 18238 4537.5 13656
GR MWD API 39.7 433.33 122.827 18238 4506 13624.5
RPX MWD OHMM 0.06 162.42 5.11528 18174 4530.5 13617
RPS MWD OHMM 0.56 2000 5.43105 18174 4530.5 13617
RPM MWD OHMM 0.43 2000 5.86849 18174 4530.5 13617
RPD MWD OHMM 0.38 2000 8.86516 18174 4530.5 13617
FET MWD HOUR 0.14 89.46 1.0108 18174 4530.5 13617
NPHI MWD PU-S 10.49 56.9 33.5031 18087 4525 13568
FCNT MWD CNTS 529 3771 1006.46 18140 4499 13568.5
NCNT MWD CNTS 109261 211518 138101 18119 4499 13568
RHOB MWD G/CM 1.95 3.196 2.33514 18089 4537.5 13581.5
DRHO MWD G/CM -0.151 0.338 0.0493961 18089 4537.5 13581.5
PEF MWD BARN 0 13.07 2.70782 18174 4495 13581.5
First Reading For Entire File......... .4495
Last Reading For Entire File.......... .13656
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2 )
.5000
START DEPTH
4506.0
4537.5
STOP DEPTH
4526.0
4557.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point......... .... .Undefined
Frame spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
22-MAY-03
Insite
67.80
Memory
4557.0
4537.0
4557.0
68.1
68.1
TOOL NUMBER
164580
8.500
4527.0
LSND
8.80
53.0
9.8
500
8.0
.000
.000
.000
.000
.0
84.2
.0
.0
Name Service Order
DEPT
Rap MWD020
GR MWD020
)
Units E:-
FT
FT/H
API
Nsam Rep Code Offset Channel
4 1 68 0 1
4 1 68 4 2
4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 4506 4557.5 4531.75 104 4506 4557.5
Rap MWD020 FT/H 10.71 237.2 131.347 41 4537.5 4557.5
GR MWD020 API 63.44 76.09 69.7219 41 4506 4526
First Reading For Entire File......... .4506
Last Reading For Entire File.......... .4557.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
F i 1 e Type. . . . . . . . . . . . . . . . La
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
PEF
NCNT
FCNT
NPHI
GR
FET
RPD
RPM
RPS
RPX
RHOB
DRHO
Rap
$
3
header data for each bit run in separate files.
3
.5000
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
START DEPTH
4495.0
4499.0
4499.0
4525.0
4526.5
4530.5
4530.5
4530.5
4530.5
4530.5
4537.5
4537.5
4558.0
STOP DEPTH
12034.0
12019.0
12019.0
12021.0
12073.0
12065.0
12065.0
12065.0
12065.0
12065.0
12034.0
12034.0
12105.0
27-MAY-03
SURFACE SOFTWARE VER~ ):
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
SLD
CTN
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
STABILIZED LITHO DEN
COMP THERMAL NEUTRON
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing..... ............... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Insite
67.80
Memory
12105.0
4557.0
12105.0
)
66.2
69.2
TOOL NUMBER
164580
134760
59952
105918
8.500
4527.0
LSND
10.10
48.0
9.0
700
4.0
1.500
1.170
1.200
2.200
80.0
138.2
80.0
80.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
NPHI MWD030 PU-S } 1 68 32 9 )
FCNT MWD030 CNTS 4 1 68 36 10
NCNT MWD030 CNTS 4 1 68 40 11
RHOB MWD030 G/CM 4 1 68 44 12
DRHO MWD030 G/CM 4 1 68 48 13
PEF MWD030 BARN 4 1 68 52 14
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 4495 12105 8300 15221 4495 12105
ROP MWD030 FT/H 15.99 395.94 212.704 15095 4558 12105
GR MWD030 API 49.49 209.72 115.612 15094 4526.5 12073
RPX MWD030 OHMM 0.06 18.13 4.66452 15070 4530.5 12065
RPS MWD030 OHMM 0.56 2000 4.95913 15070 4530.5 12065
RPM MWD030 OHMM 0.43 2000 5.20334 15070 4530.5 12065
RPD MWD030 OHMM 0.38 2000 7.37468 15070 4530.5 12065
FET MWD030 HOUR 0.14 89.46 0.583036 15070 4530.5 12065
NPHI MWD030 PU-;S 11.56 56.9 33.9192 14993 4525 12021
FCNT MWD030 CNTS 529 3244 986.586 15041 4499 12019
NCNT MWD030 CNTS 109261 199620 137275 15021 4499 12019
RHOB MWD030 G/CM 1.95 2.816 2.31558 14994 4537.5 12034
DRHO MWD030 G/CM -0.151 0.286 0.0525259 14994 4537.5 12034
PEF MWD030 BARN 0 13.07 2.39307 15079 4495 12034
First Reading For Entire File......... .4495
Last Reading For Entire File.......... .12105
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
F i 1 e Type.. . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NCNT
NPHI
RHOB
PEF
4
header data for each bit run in separate files.
4
.5000
START DEPTH
12019.5
12019.5
12021.5
12034.5
12034.5
STOP DEPTH
13273.0
13273.0
13273.5
13286.5
13286.5
DRHO
FET
RPX
RPS
RPM
RPD
GR
ROP
$
12034.
12065.5
12065.5
12065.5
12065.5
12065.5
12073.5
12105.5
13286.5
13318.0
13318.0
13318.0
13318.0
13318.0
13325.5
13358.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
SLD
CTN
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
STABILIZED LITHO DEN
COMP THERMAL NEUTRON
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............ .... . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
)
30-MAY-03
Insite
67.80
Memory
13358.0
12105.0
13358.0
65.4
67.6
TOOL NUMBER
164580
134760
151842
181190
8.500
4527.0
LSND
11.60
52.0
9.2
600
3.4
1.800
.940
1.500
2.500
70.0
140.0
70.0
70.0
Absent value............ ) . . . . . . . -999 )
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
NPHI MWD040 PU-S 4 1 68 32 9
FCNT MWD040 CNTS 4 1 68 36 10
NCNT MWD040 CNTS 4 1 68 40 11
RHOB MWD040 G/CM 4 1 68 44 12
DRHO MWD040 G/CM 4 1 68 48 13
PEF MWD040 BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12019.5 13358 12688.8 2678 12019.5 13358
ROP MWD040 FT/H 0.83 397.55 125.793 2506 12105.5 13358
GR MWD040 API 42.14 433.33 170.889 2505 12073.5 13325.5
RPX MWD040 OHMM 1.44 162.42 5.83138 2506 12065.5 13318
RPS MWD040 OHMM 1.54 116.2 6.07934 2506 12065.5 13318
RPM MWD040 OHMM 1.77 239.18 7.76021 2506 12065.5 13318
RPD MWD040 OHMM 1.95 2000 16.0157 2506 12065.5 13318
FET MWD040 HOUR 0.2 45.35 2.46079 2506 12065.5 13318
NPHI MWD040 PU-S 19.19 44.58 32.5715 2505 12021.5 13273.5
FCNT MWD040 CNTS 734 2016 1031.9 2508 12019.5 13273
NCNT MWD040 CNTS 122243 176124 139225 2508 12019.5 13273
RHOB MWD040 G/CM 2.215 3.196 2.41457 2505 12034.5 13286.5
DRHO MWD040 G/CM -0.082 0.338 0.0342958 2505 12034.5 13286.5
PEF MWD040 BARN 2.33 8.78 4.21468 2505 12034.5 13286.5
First Reading For Entire File......... .12019.5
Last Reading For Entire File.......... .13358
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
F i 1 e Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NCNT
NPHI
RHOB
DRHO
PEF
RPM
RPS
RPD
FET
RPX
GR
ROP
$
)
5
)
header data for each bit run in separate files.
5
.5000
START DEPTH
13273.5
13273.5
13274.0
13283.5
13283.5
13287.0
13318.5
13318.5
13318.5
13318.5
13318.5
13326.0
13358.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
13568.5
13568.0
13568.0
13581.5
13581.5
13581.5
13617.0
13617.0
13617.0
13617.0
13617.0
13624.5
13656.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
SLD
CTN
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
STABILIZED LITHO DEN
COMP THERMAL NEUTRON
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
01-JUN-03
Insite
67.37
Memory
13656.0
13358.0
13656.0
67.4
67.5
TOOL NUMBER
124724
56933
151842
181190
8.500
4527.0
LSND
11.60
48.0
9.6
600
3.4
1.700
.900
1.500
2.500
70.0
138.2
70.0
70.0
EWR FREQUENCY (HZ):
)
)
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
NPHI MWD050 PU-S 4 1 68 32 9
FCNT MWD050 CNTS 4 1 68 36 10
NCNT MWD050 CNTS 4 1 68 40 11
RHOB MWD050 G/CM 4 1 68 44 12
DRHO MWD050 G/CM 4 1 68 48 13
PEF MWD050 BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 13273.5 13656 13464.8 766 13273.5 13656
ROP MWD050 FT/H 1 187.7 84.4751 596 13358.5 13656
GR MWD050 API 39.7 130.96 107.263 598 13326 13624.5
RPX MWD050 OHMM 2.76 109.37 13.4738 598 13318.5 13617
RPS MWD050 OHMM 2.89 120.04 14.607 598 13318.5 13617
RPM MWD050 OHMM 3.08 106.41 14.7032 598 13318.5 13617
RPD MWD050 OHMM 3.18 124.16 16.461 598 13318.5 13617
FET MWD050 HOUR 0.4 37.71 5.7144 598 13318.5 13617
NPHI MWD050 PU-S 10.49 36.63 26.8743 589 13274 13568
FCNT MWD050 CNTS 917 3771 1404.28 591 13273.5 13568.5
NCNT MWD050 CNTS 130595 211518 154340 590 13273.5 13568
RHOB MWD050 G/CM 2.286 3.078 2.49375 597 13283.5 13581.5
DRHO MWD050 G/CM -0.017 0.28 0.0344171 597 13283.5 13581.5
PEF MWD050 BARN 3.03 9.04 4.35412 590 13287 13581.5
First Reading For Entire File......... .13273.5
Last Reading For Entire File.......... .13656
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/06/18
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.006
Physical EOF
)
')
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/06/18
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 03/06/18
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.............. ..UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File