Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-144 Image _ject Well History File c!er Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. d.o-3 - t Lb-l4- Well History File Identifier Organizing (done) o Two-sided 1111111111111111111 o Rescan Needed 1111111111111111111 RESCAN D~TAL DATA \)1 Diskettes, NO.;L. o Other, No/Type: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Color Items: o Greyscale Items: o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: BY: ~ r Date ~~ ¡ aJ Db o Other:: Scanning Preparation BY: ~ ~ ! Date: Jd.- (3 OS- X 30 ~ ~D + Date t:>- 13/ OS /5/ vvt P 11111111111111 "III /5/ vY1 tP ~ = TOTAL PAGES G d-- (Count does not i~~~ude cover ShVß1, f 11111111111111" III Project Proofing BY: ~ Production Scanning Stage 1 Page Count from Scanned File: It, 3 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES ~ Dateld-/rÓ/O"b If NO in stage 1, page(s) discrepancies were found: YES NO /5/ VVl\p NO Stage 1 BY: BY: Maria Date: /5/ 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 11111111111111" III BY: Maria Date: /5/ Comments about this file: Quality Checked III 11111111I111111I 1 0/6/2005 Well History File Cover Page. doc • MICROFILMED 03/01/2008 DO NOT PLACE _.,.~_ .. ,t"~~ _,_ tom,.. ~~,... ~.... ANY NEW MATERIAL UNDER THIS PAGE F:~L,aserFiche\CvrPgs_InsertslMicrofilm_Marker.doc J ·tJ '&; DATA SUBMITTAL COMPLIANCE REPORT 12/5/2005 Permit to Drill 2031440 Well Name/No. MILNE PT UNIT SB S-34L2 Operator BP EXPLORATION (ALASKA) INC API)J! ~~29~:71~O~ ~- MD 13454 /' REQUIRED INFORMATION Mud Log No Samples No "f)Å).. ,....- TVD ~".. Completion Date 9/1/2003 Completion Status 1-01L DATA INFORMATION Types Electric or Other Logs Run: GYRO, MWD, GR, PWD, ABI/IFR/CANSANDRA, RES Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name "f JiLð .RI" ~~ ~ "t '-i'(pt I I Log Log Run Scale Media No 12191 LIS Verification 12191 Rate of Penetration 12191 Induction/Resistivity Directional Survey Directional Survey 1-7 1-7 1-7 Well Cores/Samples Information: Name Interval Start Stop Received Sent ADDITIONAL INFORMATION Well Cored? ~ Y ~ Chips Received? ~ Analysis ~ Received? Comments: Daily History Received? Formation Tops ;J.o Compliance Reviewed By: Current Status 1-01L UIC N D;'ect~",1 ~ (data taken from Logs Portion of Master Well Data Maint Interval OHI . Start Stop CH Received Comments 69 13399 Open 10/27/2003 69 13399 Open 10/27/2003 ROP, GR, EWR4 69 13399 Open 10/27/2003 ROP, GR, EWR4 10153 13454 9/24/2003 10153 13454 9/24/2003 MWD Sample Set Number Comments G;tN' riÞN . Date: s ~~~- · STATEOFALASKA . ALASKA ~ AND GAS CONSERVATION COMM .oN WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20MC 25.105 20MC 25.110 21. Logs Run: GYRO, MWD , GR , PWD , ABI / IFR / CASANDRA , RES CASING, liNER AND CEMENTING RECORD SEtTING DEPTH Top BOTTOM 35' 110' 34' 5518' o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3252' NSL, 412' WEL, SEC. 12, T12N, R10E, UM Top of Productive Horizon: 1920' NSL, 2530' WEL, SEC. 02, T12N, R10E, UM Total Depth: 4662' NSL, 926' WEL, SEC. 02, T12N, R10E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 565599 y- 5999917 Zone- ASP4 TPI: x- 558166 y- 6003804 Zone- ASP4 Total Depth: x- 559746 y- 6006558 Zone- ASP4 18. Directional Survey 181 Yes 0 No 22. CASING SIZE WT. 94# 45.5# GRADE H-40 L-80 20" 10-3/4" 7-5/8" 4-1/2" 29.7# 12.6# L-80 L-80 32' 10137' 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Liner MD TVD MD TVD 10224' -13047' 4125' - 4147' 260 sx Arctic Set (Approx.) 935 sx PF 'L', 371 sx Class 'G' Top Job ( 54 SX PF 'L') 725 sx Class 'G' Uncemented Slotted Liner One Other 5. Date Comp., Susp., or Aband. 9/1/2003 6. Date Spudded 8/26/2003 7. Date T.D. Reached 08/28/2003 8. Elevation in feet (indicate KB, OF, etc.) KBE = 72.30' 9. Plug Back Depth (MD+ TVD) (\ ¡\k) 13454 +.4322' LII J Ft 10. Total Depth (MD+TVD) H JjO 13454 + 4ð2l ~ Ft 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/ A MSL Revised 10/30/03, Start Production 1b. Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 12. Permit Number 203-144 13. API Number 50-029-23171-61-00 14. Well Number MPS-34L2 15. Field and Pool Milne Point Unit / Schrader Bluff 16. Lease Designation and Serial No. ADL 380109 17. Land Use Permit: Milne Point Unit 20. Thickness of Permafrost 1800' (Approx.) AMOUNT PULLED 24. TUBING RECORD SIZE DEPTH SET (MD) 4-1/2"x 3-1/2", 12.6# x 9.2#, L-80 10040' PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Electric Submersible Pump OIL -BBL GAs-McF 1685 247 OIL-BBL GAs-McF 42" 13-112" 10159' 13091 ' 9-7/8" 6-1/8" 25. PACKER SET (MD) 9984' ACID, FRACTURE, CEMENT SQUEEZE, DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 95 Bbls of Diesel. 26. Date First Production: October 10, 2003 Date of Test Hours Tested PRODUCTION FOR 10/9/2003 6 TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED ... Press. 24-HoUR RATE 27. CORE DATA - '.;.. - ,--- ,- Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attacllse'p9R3te-.$I1eet, if necessary). Submit core chips; if none, state "none". . . .. None WATER-BsL o W A TER-BsL ABDMS BfL NOV 12 21!~ R ¡ GIN A L Form 10-407 Revised 2/2003 CONTINUED ON REVERSE SIDE I GAS-OIL RATIO 146 OIL GRAVITY-API (CORR) CHOKE SIZE - ~~ ð ~v 28. SBF2-NA SBF21 SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE GEOLOGIC MARKERS. NAME MD TVD 9846' 4038' 9868' 4044' 9943' 4064' 9971' 4071' 10020' 4083' 10077' 4097' 10113' 4105' 10160' 4115' 29. eMATION TESTS Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". None ,~ " 30. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary Report. 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. Signed Title Technical Assistant ~ 203-144 MPS-34L2 Well Number Permit No. / Approval No. Date to- ~ û-O~ Prepared By Name/Number: Drilling Engineer: Sandra Stewman, 564-4750 Matt Green, 564-5581 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". Form 10-407 Revised 2/2003 ITEM 29: List all test information. If none, state "None". ORfGINAL . 003~-JLjL{ . WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 October 13, 2003 RE: MWD Formation Evaluation Logs MPS-34 L2, AK-MW-2600988 1 LIS formatted Disc with verification listing. I c9 19 \ API#: 50-029-23171-61 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Signed~é')\ ~ )V"'~"-~~ ~~".. <:.. .. \'''' \':) \') n \ \.J-~ . STATE OF ALASKA . ALAS~ AND GAS CONSERVATION COM· ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: 1m Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: GYRO, MWD , GR , PWD , ABI / IFR / CASANDRA , RES CASING, LINER AND CEMENTING RECORD seT'tINGDèÞTIi BOTTOM 110' 5518' o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3252' NSL, 412' WEL, SEC. 12, T12N, R10E, UM Top of Productive Horizon: 1920' NSL, 2530' WEL, SEC. 02, T12N, R10E, UM Total Depth: 4662' NSL, 926' WEL, SEC. 02, T12N, R10E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 565599 y- 5999917 Zone- ASP4 TPI: x- 558166 y- 6003804 Zone- ASP4 Total Depth: x- 559746 y- 6006558 Zone- ASP4 18. Directional Survey 1m Yes 0 No 22. 20" 10-3/4" 94# 45.5# H-40 L-80 35' 34' 7-5/8" 4-1/2" 29.7# 12.6# L-80 L-80 32' 10137' 23. Perforations open to Production (MD + TVD of To,e and Bottom Interval, Size and Number; if none, state' none"): 4-1/2" Slotted Liner MD TVD MD TVD 10224' -13047' 4125' - 4147' 26. Date First Production: Not On Production Date of Test Hours Tested PRODUCTION FOR TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED .......... Press. 24-HoUR RATE7 260 sx Arctic Set (Approx.) 935 sx PF 'L', 371 sx Class 'G' Top Job ( 54 sx PF 'L') 725 sx Class 'G' Uncemented Slotted Liner One Other 5. Date Comp., Susp., or Aband. 9/1/2003 - 6. Date Spudded 8/26/2003 7. Date T.o. Reached 08/28/2003 8. Elevation in feet (indicate KB, OF, etc.) KBE = 72.30' 9. Plug Back Depth (MD+ TVD) 13454 + 4322 Ft 10. Total Depth (MD+TVD) 13454 . + 4322 Ft 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL 42" 13-1/2" 10159' 13091' 9-7/8" 6-1/8" SIZE 4-1/2"x 3-1/2", 12.6# x 9.2#, L-80 1b. Well Class: 1m Development 0 Exploratory o Stratigraphic 0 Service 12. Permit Number 203-144 13. API Number 50- 029-23171-61-00 14. Well Number MPS-34L2 15. Field and Pool Milne Point Unit / Schrader Bluff 16. Lease Designation and Serial No. ADL 380109 17. Land Use Permit: Milne Point Unit 20. Thickness of Permafrost 1800' (Approx.) DEPTH SET (MD) 10040' PACKER SET (MD) 9984' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 95 Bbls of Diesel. PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-BBL GAs-McF WATER-BBL CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". r--»-- I COMPLETION '1 f DATE__> I '. .!t. \:;[;f:f-.;5 J R· t G \ N A L I~::¿;~"~_~ I OIL-BBL 27. None Form 10-407 Revised 2/2003 GAs-McF W A TER-BBL CHOKE SIZE I GAS-OIL RATIO OIL GRAVITY-API (CORR) OC1 2 \JiGU3 CONTINUED ON REVERSE SIDE RBDMS BFL. 0(':: 28. GEOLOGIC MARKER. 29. eRMATION TESTS Include and briefly summarize test results. List intervals tested, NAME MD TVD and attach detailed supporting data as necessary. If no tests were conducted, state "None". SBF2-NA 9846' 4038' None SBF21 9868' 4044' SBF1-NB 9943' 4064' SBF1-NBR 9971' 4071' SBF12 10020' 4083' SBE4-NC 10077' 4097' SBE41 10113' 4105' SBE2-NE 10160' 4115' 30. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary Report. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Sondr Stew an -\ Title Technical Assistant Date I 0 - oS-03 - MPS-34L2 Well Number 203-144 Permit No. I Approval No. Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Matt Green, 564-5581 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Oq!GfNAL Form 10-407 Revised 2/2003 .... . BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-34 MPS-34 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Start: 8/10/2003 Rig Release: Rig Number: Spud Date: 8/11/2003 End: Date Frorn-Tb Hours Task Codê NPT Phase DescriptionofOpètatibns 8/11/2003 00:00 - 00:30 0.50 MOB P PRE Skid rig floor from drlg position to move position 00:30 - 02:30 2.00 MOB P PRE Move rig from MPS-02i to MPS-34 02:30 - 03:00 0.50 MOB P PRE Skid rig floor from move position to drlg position 03:00 - 03:30 0.50 MOB P PRE Rig up floor 03:30 - 05:30 2.00 MOB P PRE Accept rig @ 03:30 Hrs 8/11/2003 - Nipple up divertor 05:30 - 12:00 6.50 DRILL P SURF Load pipe shed with 4" dp - Pick up 195 Jts of 4" dp - Stand back in derrick 12:00 - 13:30 1.50 DRILL P SURF Pick up flex dc's - 5" hwdp - stand back in derrick 13:30 - 14:00 0.50 DRILL P SURF Pick up short bha up beaver slide 14:00 - 15:00 1.00 DRILL P SURF Make up bit / motor/ mwd - orient same - con't make up bha 15:00 - 15:30 0.50 DRILL P SURF Function test divertor - Accumulator test - Witness of test waived by Chuck Scheve with AOGCC - Hang sheeve and line for Gyro in derrick 15:30 - 16:00 0.50 DRILL P SURF Conduct pre spud meeting with all personnel - Fill stack with mud - check for surface leaks - 16:00 - 00:00 8.00 DRILL P SURF Spud in well S-34 - Directional drill from 112' to 930' - WOB 35K to 40K - RPM 80 - TO on 5K - off 1K - GPM 423 - PP on 1400 - off 1120 - PU 93K - SO 93K - ROT 93K - Rigged down Gyro survey equipment (two gyro surveys ran) 8/12/2003 00:00 - 14:30 14.50 DRILL P SURF Directional Drill from 930' to 3018' - WOB 40K - GPM 502 - PP 2650 - off 2300 - RPM 80 - TO on 10 k - off 5 k - PU 1 02K - SO 77K - ROT 95K 14:30 - 16:30 2.00 DRILL P SURF CBU 3X - GPM 502 - PP 2300 - RPM 80 - TO 5K - PU 105K- SO 78K - ROT 95K - Circ from 3018' to 2928' - 30 mins - stand back one stand - Circ from 2928' to 2832' - 30 mins - stand back one stand - Circ from 2832 to 2736' to bottoms up - 16:30 - 18:30 2.00 DRILL P SURF Pump out from 2736' to 815' to HWDP - no problems - hole in good shape 18:30 - 19:30 1.00 DRILL P SURF RIH from 815' to 1550' bridge - work through bridge to 1580'- RIH to 1600' bridge - work through bridge to 1638' - Con't RIH to 2826' hit bridge 19:30 - 22:00 2.50 DRILL N DPRB SURF Attempt to work through bridge @ 2826' - Pump at 1/2 drlg rate GPM 250 - Attempt to wash through bridge - Pump at full rate - Orient to high side 10L - Re-drill from 2826' to 3018' 22:00 - 00:00 2.00 DRILL P SURF Directional drill from 3018' to 3306' - WOB 40K - RPM 80 - TQ on 10K - off 6K - GPM 503 - PP on 2700 - off 2400 - PU 103K - SO -75K - ROT 91K 8/13/2003 00:00 - 15:00 15.00 DRILL P SURF Directional Drill from 3311' to 5526' - WOB 45K - GPM 503 - PP on 3750 - off 3280K - RPM 80 - TQ on 15K - off 7K - PU 125K - SO 70K - Rot 95K 15:00 - 19:00 4.00 CASE P SURF CBU 3 X - RPM 100 - TQ 7K - GPM 503 - PP 3200 - PU 125K- SO 70K - ROT 95K 19:00 - 23:00 4.00 CASE P SURF Pump out from 5526' to 817' - Pump out drlg rate - 445 gpm - tight spot @ 5035' 23:00 - 00:00 1.00 CASE P SURF RIH from 815' to 3800' - Tight 1536' 8/14/2003 00:00 - 01 :00 1.00 CASE P SURF RIH - from 3800' to 5526' - Wash last stand to bottom 01 :00 - 04:00 3.00 CASE P SURF CBU 3 X - GPM 503 - PP 3300 - RPM 100 - TQ 7K - PU 125 - SO 65K - ROT 94K 04:00 - 07:30 3.50 CASE P SURF Pump out from 5526' to 815' HWT - 1 st ten stands pumped at 5 bpm laying lubricate pill across bottom 900 feet - (from 5526' to 4626') - Pump out at drlg rate 445 GPM 07:30 - 09:30 2.00 CASE P SURF Rack back 5" HWT - Stand back 6.75" Flex dc's - Lay down 8" bha Printed: 91212003 9:55:32 AM . . BP EXPLORATION Operations Summary Report Page 2 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-34 MPS-34 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Start: 8/10/2003 Rig Release: Rig Number: Spud Date: 8/11/2003 End: Date From-To Hours Task Code NPT Phase Description of Ope rations 8/14/2003 09:30 - 10:30 1.00 CASE P SURF Rig up to run 103/4" - PJSM 10:30 - 16:00 5.50 CASE P SURF Run 133 joints 10 3/4" 1 45.5# 1 L-80 1 BTC casing - Set down at 1800' - Work pipe down without circulating - Con't run pipe minor problems to 2800' - No problems in tangent section - Land pipe with 30K pipe weight left 16:00 - 16:30 0.50 CASE P SURF Rig down Franks fill up tool - Rig up Howco Cementing head - Break circulation 16:30 - 20:00 3.50 CASE P SURF Circulate 1 Condition mud for cement job - Start @ 2.8 bpm 440 psi· staging up to 10 bpm 420 psi 20:00 - 22:30 2.50 CEMT P SURF Howco pump 10 bbls water - Test lines to 3500 psi - Pump 10 bbls water - Pump 75 bbls Alpha spacer - mixed at 10.2 ppg- (one gallon dye first 5 bbls spacer pumped) - Drop bottom plug on fly of last 5 bbls spacer pumped - Mix and pump 935 sxs 691 bbls Type "L" Yeild 4.15 cf/sx -mixed @ 10.7 ppg -7 bpm- Mix and pump 375 sxs 76 bbls Class "G" with 2 % Cacl 1 Yeild 1.15 cf/sx - mixed @ 15.8 ppg - 5 bpm 500 psi - Drop top plug - Kick out with Howco 30 bbls water 5 bpm 650 psi - Displace with Rig - 5 bpm 900 psi - Lost returns 210 bbls pumped- Regain retruns 230 bbls pumped 8/15/2003 00:00 - 01 :00 1.00 CEMT P SURF Con't displacing cement with rig @ 4 bpm 1120 psi - Lost retruns total returns after displacing 290 bbls - Con't displacing 4 bpm @ 1500 psi - Total displacement 522 bbls - Bump plug with 2500 psi - 1000 over - Held pressure for 5 mins - Bled off pressure - floats holding - No Cement to surface - (Did see spacer with dye back) 01 :00 - 02:00 1.00 CASE P SURF Flush Divertor - Flowline - Break and lay down Howco cementing head - Lay down casing tools - lay down landing joint 02:00 - 03:00 1.00 CASE P SURF Nipple down divertor 03:00 - 03:30 0.50 CASE N CEMT SURF Prepare for top job - Install hoses 1 lines in cellar for Super sucker 1 vac truck - 1" pipe in pipe shed - Pick up handling tools for 1" pipe- 03:30 - 05:00 1.50 CASE P SURF Change out saver sub on top drive - Top drive service 05:00 - 07:00 2.00 CEMT N CEMT SURF RIH with 1" CS hydrill tubing - Tag up hard at 134' RKB measurements - Pump 50 bbls fresh water to flush conductor pipe - Followed by 54 sxs ofType "L" - Yield 4.15 cf/sx - 224 cf - 40 bbls slurry mixed at 10.5 ppg -10 bbls of 10.5 ppg cement to surface - Left in hole 30 bbls of slurry - 40 sxs 07:00 - 08:00 1.00 CASE P SURF Nipple up 12" FMC Casg head - metal to metal seal - 11" x 11" 5M G5 tubing head - Test to 1000 psi for 10 mins 08:00 - 09:30 1.50 CASE P SURF Nipple up BOP's 09:30 - 10:00 0.50 CASE P SURF Install test plug - Rig up testing equipment 10:00 - 13:00 3.00 CASE P SURF Test BOP's - 250 low 2500 high Annular each test 5 mins - 250 low 3500 high - Top pipe rams - Bottom rams - Blind rams- Choke manifold - Hyd Kill 1 Choke valves - Manual Kill 1 Choke valves - Upper 1 Lower IBOP - Floor safety valve - Floor dart valves - Each test 5 mins - John Crisp with AOGCC waived witness of BOP test 13:00 -13:30 0.50 CASE P SURF Pull test plug - Install wear ring - Close annulus valves - Rig down test equipment 13:30 - 14:00 0.50 CASE SURF Pick up short bha up beaver slide 14:00 - 15:30 1.50 CASE P SURF Pick up motor 1.22 degree - make up bit - MWD / GR 1 RES / PWD - orient same - Con't make up BHA Printed: 91212003 9:55:32 AM . . BPEXPLORATION Operations SUr11hläryReport 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-34 MPS-34 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Start: 8/10/2003 Rig Release: Rig Number: Spud Date: 8/11/2003 End: Date From- To Höurs Task Code NPT Phase Description of Operations 8/15/2003 15:30 - 16:00 0.50 CASE P SURF RIH HWT - Surface test MWD @ 726' - 400 gpm 1150 psi 16:00 - 17:30 1.50 CASE P SURF RIH from 726' to 5332' 17:30 - 18:30 1.00 CASE P SURF Break circulation - Test 10 3/4" casing to 2500 psi for 30 mins - Record on chart 18:30 - 19:30 1.00 CASE P SURF Cut drilling line 19:30 - 20:30 1.00 DRILL P SURF Drill Flequipment - cement - 20" new hole from 5526' to 5546' 20:30 - 22:00 1.50 CASE P SURF Circulate conditioning mud for FIT - GPM 400 - PP 2100 psi - 50 RPM - TQ 7K 22:00 - 22:30 0.50 CASE P SURF Perform FIT - Hole T.D. 5546 MD - Shoe 5518' MD - 2894' TVD - Mud weight 8.9 ppg - Surface pressure 400 = 11.56 ppg EMW - Recorded on chart 22:30 - 00:00 1.50 DRILL P INT1 Spot new mud at bit - Drill from 5546' to 5750' - WOB 30K - RPM 120 - TO on 11K - off 7K - GPM 400 - PP on 1920' - off 1820' - PU 145K - SO 70K - ROT 98K 8/16/2003 00:00 - 23:00 23.00 DRILL P INT1 Directional Drill from 5750' to 8846' - WOB 30K - RPM 120 - TQ on 9K - off 7K - GPM 423 - PP on 2980 - off 22790 - PU 133K - SO 82K - ROT 106K 23:00 - 00:00 1.00 DRILL P INT1 CBU 3 X - GPM 440 - PP 2700 - RPM 120 - TO 7.5K - PU 133 - SO 82 - ROT 105 8/17/2003 00:00 - 02:30 2.50 DRILL P INT1 Con't CBU 3 X - GPM 45 - PP 2600 - RPM 120 - TQ 8K - PU 134K - SO 83K - ROT 107K 02:30 - 05:30 3.00 DRILL P INT1 Pump out from 8846' to 5427' - @ Drlilling rate 430 gpm - Tight spot 7250' - 7205 to 7070' ratty - 6568 to 6530 ratty 05:30 - 08:00 2.50 DRILL P INT1 Monitor well - Well static - Pump dry job - POH from 5427' to BHA @ 726' 08:00 - 09:00 1.00 DRILL P INT1 Download - Upload MWD 09:00 - 10:00 1.00 DRILL P INT1 Break off bit - reset motor from 1.22 to 1.5 - Make up new bit - Orient MWD - RIH with 6.5" flex dc's - 5" HWT 10:00 - 12:00 2.00 DRILL P INT1 RIH from 726' to 5550' - Test MWD with bit and motor out shoe 12:00 - 13:00 1.00 DRILL P INT1 Con't RIH from 5550' to 8846' - Hole in good shape - No tight spots 13:00 - 00:00 11.00 DRILL P INT1 Directional Drill from 8846' to 9960' - WOB 40K - RPM 80 - TO on 12K - off 9K - GPM 423 - PP on 3320 - off 3150 - PU 150K- SO 80K - ROT 113K - Add two drums E-P Mud lube to slick up casing - Added 3% Lubricants with IDLube and Lubetex 8/18/2003 00:00 - 14:30 14.50 DRILL P INT1 Directional Drill from 9960' to 11159' - T.D. 97/8" hole - WOB 40K - RPM 80 - TQ on 10K - off 9K - GPM 423 - PP on 3830- off 3510 - PU 150K - SO 83K - ROT 114K 14:30 - 17:30 3.00 CASE P INT1 CBU 2 X - (20000 strokes) - GPM 423 - PP 3700 - RPM 100- TQ 8K - PU 150K - SO 83K - ROT 115K 17:30 - 20:30 3.00 CASE P INT1 Pump out from 11159' to 8000' - Pump at drilling rate 423 gpm - Hole in good shape - No problems 20:30 - 21 :30 1.00 CASE P INT1 RIH frrom 8000' to 11159' - No problems - Hole in good shape 21 :30 - 00:00 2.50 CASE P INT1 CBU 3 X - (30000 strokes) - GPM 423 - PP 3770 - RPM 100- TQ 8K - PU 150K - SO 83K - ROT 114K 8/19/2003 00:00 - 02:30 2.50 CASE P INT1 Con't CBU 3 X - GPM 423 - PP 3680 - RPM 100 - TQ 9K - PU 150K - SO 83K - ROT 115K - Lots of thick mud back on bottoms up 10,000 strokes - 12,000 strokes - 16,500 strokes 02:30 - 04:30 2.00 CASE P INT1 Pump out from 11159' to 8782' - Pump at drlg rate 423 gpm - 3380psi 04:30 - 05:00 0.50 CASE P INT1 Pull out 8782' to 8302', well not taking proper fill 05:00 - 06:00 1.00 CASE P INT1 Pump out from 8302' to 7630' - Pump at drlg rate 423 gpm 06:00 - 07:00 1.00 CASE P INT1 Pull out 7630' to 5427' Monitor well, hole static Printed: 9/212003 9:55:32 AM . . BP EXPLORATION Operations Summary Report Page 40f 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-34 MPS-34 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Start: 8/10/2003 Rig Release: Rig Number: Spud Date: 8/11/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 8/19/2003 07:00 - 08:00 1.00 CASE P INT1 Slip and cut drilling line 08:00 - 10:00 2.00 CASE P INT1 Trip in hole, ream from 11088'1 11159' 10:00 - 15:00 5.00 CASE P INT1 Circ. three bottoms up, with 449 gpm. 3700 psi, 100 rpms, 8k torque, P/U 150k SIO 87k, RTW 116k 15:00 - 20:00 5.00 CASE P INT1 Flow check, pull out of hole to BHA, No problems, getting P/U and SIO wt. every 10 sds 20:00 - 22:30 2.50 CASE P INT1 Laying down BHA, clear floor 22:30 - 00:00 1.50 CASE P INT1 Change top rams to 7 5/8, remove saver sub from top drive to install TESCO CDA tool 8/20/2003 00:00 - 04:00 4.00 CASE P INT1 Installing TESCO CDA tool, as per Tesco tech. install extension sub on top drive, fit anti-rotation device, re-install torque rings on top drive, and Dan Glacken fell backwards off ladder from bottom step and landed on his back, send to medic to be checked 04:00 - 05:00 1.00 CASE N HMAN INT1 Safety stand down, meeting with all hands on regarding fall from ladder 05:00 - 06:00 1.00 CASE P INT1 Installing CDA tools 06:00 - 06:30 0.50 CASE P INT1 Test BOP door seals to 1500 psi, rig down test Eqp. and clear floor 06:30 - 09:00 2.50 CASE N HMAN INT1 Shut down for Accident investigation 09:00 - 14:30 5.50 CASE P INT1 PJSM with Tesco Techs on running csg, Picking up 7 5/8 29.7# L-80 csg. getting pick up and slack off wt.S every 20 jts to 3390', bend one grapple on CDA tool 14:30 - 15:00 0.50 CASE N SFAL INT1 Replace bend grapple 15:00 - 17:30 2.50 CASE P INT1 Picking up 7 5/8 29.7# L-80 csg, getting pick up and slack off wt.S every 20 jts to 5518' 17:30 - 19:00 1.50 CASE P INT1 Circ one full circulation @ shoe with 60 spm 400 psi 19:00 - 00:00 5.00 CASE P INT1 Picking up 7 5/8 29.7# L-80 csg getting pick up and slack off wt.S every 20 jts, to 9800' 8/21/2003 00:00 - 02:00 2.00 CASE P INT1 Finish Picking up 7 5/8 29.7# L-80 csg getting pick up and slack off wt.S every 20 jts, to 11159', total of 274 jts.11170 ft, set @ 11,159, float @ 11,075, P/U 250K, SIO 90K wash last jt to bottom no fill, no hole problems running csg, CDA tool worked good, Csg was not rotate with CDA tool. 02:00 - 03:30 1.50 CASE P INT1 Circ. stage up to 6 bbls min. 500 psi full returns, circ one csg volume 5,120 strokes. Didn't Reciprocate csg 03:30 - 04:00 0.50 CASE P INT1 Rig up cement head 04:00 - 05:30 1.50 CASE P INT1 Circ. 6 bbls min. 500 psi full retums, circ one csg volume 5,120 strokes. Didn't Reciprocate csg 05:30 - 07:30 2.00 CEMT P INT1 Cement with Halliburton with 5 bbls water, test lings 3500 psi, 15 bbls water, 35 bbls Alpha spacer mixed @ 10.5, drop bottom plug,725 sxs. Class G 156 bbls mixed @ 15.6, drop top plug, displace with Halliburton with 9.5 Flo-Pro mud, @ 8 bbls min, pumped 509 bbls bump plug with 1600 psi, full return tru out job, floats held 07:30 - 08:00 0.50 CEMT P INT1 Rig down cement head 08:00 - 10:30 2.50 CEMT P INT1 Change rams to 2718 X 5", nipple down flow lines, pick up BOPS 10:30 -11:00 0.50 CEMT P INT1 Set Emergency slips with 150k on slips 11:00 - 12:00 1.00 CEMT P INT1 Make rough cut and final cut as per FMC tecto 12:00 - 14:00 2.00 CEMT P INT1 Nipple up BOPS, rig down Tesco CDA Equip. 14:00 - 15:30 1.50 CEMT P INT1 Install new saver sub, bails and 5" elevators on top drive 15:30 - 16:30 1.00 CEMT P INT1 Install 10 3/4 x 7 5/8 packoff and test same to 3350 psi for 10 Printed: 91212003 9:55:32 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 8/21/2003 8/22/2003 8/23/2003 8/24/2003 8/25/2003 - . ... -- BP EXPLORATION MPS-34 MPS-34 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Start: 8/10/2003 Rig Release: Rig Number: Spud Date: 8/11/2003 End: From - To Hours Task Code NPT I Phase 15:30 - 16:30 16:30-21:00 21 :00 - 22:00 22:00 - 00:00 00:00 - 02:00 02:00 - 05:00 05:00 - 11 :30 11 :30 - 12:00 12:00 - 16:30 16:30 - 18:00 18:00 - 18:30 18:30 - 21 :00 21 :00 - 22:00 22:00 - 23:00 23:00 - 00:00 00:00 - 02:00 02:00 - 03:00 03:00 - 05:00 05:00 - 06:30 06:30 - 07:00 07:00 - 08:30 08:30 - 09:30 09:30 - 10:00 10:00 - 00:00 00:00 - 00:00 00:00 - 04:30 04:30 - 08:00 08:00 - 10:30 10:30 - 12:00 12:00 - 15:00 15:00 - 16:00 16:00 - 16:30 16:30 - 18:30 18:30 - 22:00 22:00 - 23:30 1.00 CEMT P 4.50 CASE P 1.00 CASE P 2.00 CASE P 2.00 STWHIP P 3.00 STWHIP P 6.50 STWHIP P 0.50 STWHIP P 4.50 STWHIP P 1.50 STWHIP P 0.50 STWHIP P 2.50 STWHIP P 1.00 STWHIP P 1.00 STWHIP P 1.00 STWHIP P 2.00 STWHIP P 1.00 STWHIP P 2.00 STWHIP P 1.50 STWHIP P 0.50 STWHIP N 1.50 STWHIP P 1.00 STWHIP P 0.50 STWHIP P 14.00 DRILL P 24.00 DRILL P 4.50 DRILL P 3.50 CASE P 2.50 P 1.50 CASE P 3.00 CASE P 1.00 CASE P 0.50 CASE P 2.00 CASE P 3.50 CASE P 1.50 CASE P INT1 INT1 INT1 INT1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 RREP PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 LNR1 Description of Operations "_.-- min. Rip up test BOPS and Manifold 250 psi low. 3500 psi high for 5 min. per test, Hydril250 low, 2500 high, 5 min. per test., Install wear ring, The right to witness test was wavier by Jeff Jones AOGCC Test csg to 3500 psi for 30 min. Picking up 12-4 3/4 Dc and 16 jts 3.5 HWP pump tru to insure they are free of rust, stand back in derrick Picking up 17 jts and cut jt. of 3.5 tubing for space out of whipstock Pick up Trip anchor, whipstock, mills and MWD, orient same, finish picking up BHA # 4 Tripping in with whipstock Orient to 20 degrees to right of high side, set trip anchor, shear whipstock Mill window 10,516 to 10,528' Drill to 10,540', top O-A sand 10515' Circ and work window, pump sweep 340 gals min 2650 psi FiTtest with 9.5 MW 340 psi 4198 TVD= 11.0 EMW Slug pipe, pull out to SHA Stand back BHA,Lay down MWD and mills Pick up stack washer and flush out SOPS, Function all rams Picking up 90 jts 4" drill pipe Finish picking up 90 jts 4" pipe, Circ. tru pipe to clear out rust Stand 30 stands in derrick Clear floor, P/U BHA #5 Tripping in hole To 5,957, Iron roughneck broke Rig up spinner hawk, PJSM Tripping in to 10,369 Slip and cut drilling line Trip in to 10465, Orient to high side, slide tru window Directional drill from 10540 to 11,392 with 80 rpms, 250 gals min. 2450 psi Directional drill from 11,392 to 13,030 with 80 rpms, 250 gals min. 2550 psi, having lots of trouble sliding,Motor acting weak stalls to easy, ASI working part time, Lube up to 4%, AST 6.09, ART 10.25, TQ 6500 Directional drill from 13,030' to 13,232' TD with 80 rpms, 250 gals min. 2550 psi, (went out of O-A 13,160) Circ, three bottoms up with 100 rpms, 280 gals min 2800 psi Pump out to Csg shoe, pump to 10561, pull tru window @ 10516 with out pumping, no problems pumping out Circ two bottoms up with 280 gals min 100 rpms 2450 psi Slug pipe, trip out to BHA Stand back jars and de., lay down MWD, motor Rig up to pickup liner, PJSM Picking up 4.512.6# L-80 slotted liner, total 61 jts slotted, 10 jts 4.512.6# L-80 solid liner 2931', Baker 7518 X 5.5 HMC liner hanger, Baker 7 5/8 X 5.5 ZXP liner top packer. Tripping in with liner to 13232', no problems tripping in with liner,drop ball, pickup wt 145,000, SIO 80,000 Pump ball to seat with 3 bbls min. 900 psi, set hanger with 2500 psi,set packer with 3300 psi, shear ball with 4,300 psi, Printed: 912/2003 9:55:32 AM ..... . BP EXPLORATION Operations Summary Report Page 6 of 8 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-34 MPS-34 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Start: 8/10/2003 Rig Release: Rig Number: Spud Date: 8/11/2003 End: Date FrÔI'l1,,-To Hours Code NPT Phase Description of Operâtiôhs 8/25/2003 22:00 - 23:30 1.50 CASE P LNR1 test liner top packer with 1000 psi on back side,rotate off liner, pickup wt without liner 126,000, top of tie back sleeve 10274, packer @ 10280' 23:30 - 00:00 0.50 CASE P LNR1 Flow check, Tripping out with running tools 8/26/2003 00:00 - 03:00 3.00 CASE P LNR1 Tripping out with running tools 03:00 - 03:30 0.50 CASE P LNR1 Lay down running tools 03:30 - 04:00 0.50 STWHIP P PROD2 Clear floor, PJSM 04:00 - 06:30 2.50 STWHIP P PROD2 Pickup 3.5 spacer jts, Baker whipstock and mills,MWD 06:30 - 10:30 4.00 STWHIP P PROD2 Tripping in with whipstock to 10245' 10:30 - 11 :00 0.50 STWHIP P PROD2 Orient 11 degrees to right of high side, set whipstock 11 :00 - 14:00 3.00 STWHIP P PROD2 Mill window, 10159' to 10171' drill to 10184' 14:00 - 15:30 1.50 STWHIP P PROD2 Circ. Two bottoms up, pumped sweep, worked window 15:30 - 18:00 2.50 STWHIP P PROD2 Flow check, POH to BHA 18:00 - 19:00 1.00 STWHIP P PROD2 Stand back DC, lay down MWD,and window mills 19:00 - 20:30 1.50 STWHIP P PROD2 Pickup Johnny Wacker, Flush BOPS stack, and function rams 20:30 - 00:00 3.50 BOPSURP PROD2 Pull wear ring, Test BOPS and manifold 250-3,500 psi 5 min. per test, Hydril 250-2,500 psi 5 min. per test, install wear ring. the right to witness test was wavier by Jeff Jones AOGCC. 8/27/2003 00:00 - 01 :30 1.50 DRILL P PROD2 PJSM,Clear floor, Pickup BHA # 7, surface test MWD 01 :30 - 04:30 3.00 DRILL P PROD2 Tripping in to 10,080' 04:30 - 05:30 1.00 DRILL P PROD2 Cut and slip Drilling line 05:30 - 06:00 0.50 DRILL P PROD2 Orient, slide tru window without pumping, tag bottom 10184' 06:00 - 00:00 18.00 DRILL P PROD2 Directional Drill 1 0,184' to 11953" with 80 rpms, 245 gpm, 3000 psi AST 4.58, ART 6 8/28/2003 00:00 - 16:30 16.50 DRILL P PROD2 Directional Drill 11953' to 13454'TD with 80 rpms, 245 gpm, 3450 psi 16:30 - 20:30 4.00 CASE P PROD2 Circ, four bottoms up with 280GPM, 3800 psi, 100 RPMs 20:30 - 23:30 3.00 CASE P PROD2 Pumping out to window @ 10159,with full drilling rate, pull tru window with out pumping 23:30 - 00:00 0.50 CASE P PROD2 eire, two bottoms up with 280GPM, 2700 psi, 100 RPMs 8/29/2003 00:00 - 01 :30 1.50 CASE P PROD2 Circ, two bottoms up with 280GPM, 2700 psi, 100 RPMs 01 :30 - 05:00 3.50 CASE P PROD2 Tripping out to BHA 05:00 - 06:00 1.00 CASE P PROD2 Laying down BHA 06:00 - 07:30 1.50 CASE P PROD2 Picking up BHA # 8 Whipstock Retrieving tool., surface test MWD 07:30 - 10:30 3.00 CASE P PROD2 Trip in to 10130' 10:30 - 11:00 0.50 CASE P PROD2 Orientate, engage whipstock,pull free 11:00-12:00 1.00 CASE P PROD2 Circ bottoms up, 250 gals min. 1800 psi 12:00 - 15:30 3.50 CASE P PROD2 Poh with whipstock 15:30 - 18:00 2.50 CASE P PROD2 Lay down BHA, whipstock, and space out jts. 18:00 - 19:00 1.00 CASE P PROD2 Rig up to pickup liner,PJSM 19:00 - 21 :00 2.00 CASE P PROD2 Picking up Slotted liner 4.512.6# L-80 IBT total 71 jts 2906' and Baker Hook wall hanger, two centralizers per jt. on slotted jts 21 :00 - 23:30 2.50 CASE P PROD2 Tripping in with liner to 10150' 23:30 - 00:00 0.50 CASE P PROD2 Working trying to Exit window @ 10159' to 10171' 8/30/2003 00:00 - 01 :00 1.00 CASE P PROD2 Working trying to Exit window @ 10159' to 10171' setting down on lower liner @ 10273, got out window on the 8th try 01:00 - 02:30 1.50 CASE N DPRB PROD2 Working liner @ 10260' acts like the centralizer in the middle #3 jt is hanging on bottom of window. P/U wt 125,000 SIO wt 90,000 02:30 - 03:00 0.50 CASE N DPRB PROD2 Pulled above window and went back to lower liner top @ Printed: 91212003 9:55:32 IW ..... . '- / BP EXPLORATION .·(¡)perë;Jtions Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-34 MPS-34 ORIG DRILLING DOYON DRILLING INC. DOYON 14 Date From - To Hours Task Code NPT Phase 8/30/2003 02:30 - 03:00 0.50 CASE N DPRB PROD2 03:00 - 03:30 0.50 CASE N DPRB PROD2 03:30 - 06:30 3.00 CASE N DPRB PROD2 06:30 - 07:00 0.50 CASE N DPRB PROD2 07:00 - 11 :30 4.50 CASE N DPRB PROD2 11 :30 - 12:00 0.50 CASE N DPRB PROD2 12:00 - 15:30 3.50 CASE N DPRB PROD2 15:30 - 18:00 2.50 CASE N DPRB PROD2 18:00 - 21 :30 3.50 CASE N DPRB PROD2 21 :30 - 23:30 2.00 CASE P PROD2 23:30 - 00:00 0.50 CASE P PROD2 8/31/2003 00:00 - 01 :00 1.00 CASE P PROD2 01 :00 - 05:00 4.00 CASE P PROD2 05:00 - 05:30 0.50 CASE P PROD2 05:30 - 08:30 3.00 CASE P PROD2 08:30 - 09:30 1.00 CASE P PROD2 09:30 - 12:00 2.50 CASE P PROD2 12:00 - 17:30 5.50 CASE P PROD2 17:30 - 19:00 1.50 CASE P PROD2 19:00 - 00:00 5.00 CASE P PROD2 9/1/2003 00:00 - 05:00 5.00 CASE P PROD2 05:00 - 06:30 1.50 CASE P PROD2 06:30 - 07:30 1.00 BOPSUR.P PROD2 07:30 - 09:00 1.50 WHSUR P PROD2 09:00 - 09:30 0.50 WHSUR P PROD2 09:30 - 10:00 0.50 CASE P PROD2 10:00 - 10:30 0.50 CASE P PROD2 Page of8 Start: 8/10/2003 Rig Release: Rig Number: Spud Date: 8/11/2003 End: 10273' Orient and went out window on 3rd try, to 10260' and liner still hanging up @ same spot. POH to liner hanger inspect liner hanger,stand back in derrick PJSM, lay down liner found two centralizers pushed up to collar onjt.#2 Service top drive Picking up Slotted liner 4.512.6# L-80 IBT total 71 jts 2906' and Baker Hook wall hanger, no centralizers on jt. 1 tru 3, one centralizer per jt on jts 4 tru 6, two centralizers per jt on 7 tru 70, no centralizer on jt 71, stop rings welded in middle of jt. Tripping in with liner to 10165' Working pipe to locate window, exit window after 24 attempts Tripping in with liner had to beat centralizers past bottom of window for app. 1300' the rest went with no problems, hole was slick, pickup wt. 134,000 SIO 80,000 Hooking liner hanger, took 6 attempts, top of liner tie back sleeve 10,136' shoe 13,091' Drop ball, pumped down 3 bbls min.,750 psi, pressure up to 4300 psi, shear ball, release from liner hanger, P/U wt 125,000 Slug pipe, Tripping out with running tools, laying down 105 jts of excess drill pipe. Laying down liner running tools Pick up Johnny Wacker tripping in to 10,070' Slip and cut drilling line Displace hole with 9.5 brine with Inhibitor, with 10 bbls min. 120 rpms, 3050psi PJSM, laying down excess drill pipe, stand 40 stands in derrick Pull wear ring, Rig up I-wire spool, rig up tubing tongs, count tubing Picking up, 3.5 tail pipe assem. Baker 7 5/8x 4.5 Premier packer, and Phoenix jet pump sensors and gauge, picking up 4.512.6# L-80 IBT Tubing with I-wire to 4,312' Finish picking up 4.512.6# L-80 1ST Tubing with I-wire to 10,040.05 total of 237 jts, tail pipe 10,040, XN 10034, packer, 9984, x nipple 9973, Phoenix Sensor 9957, Sliding sleeve 9934, Phoenix pressure gauge 9923, GLM 2101' Picking up FMC hanger and land tubing P/U 115K, SIO 83K 123 Clamps. 123 cannon clamps used. Test I-Wire. RILDS and test TWC to 300 psi from below. Clear rig floor. Nipple down BOP stack. Nipple up FMC 11" X 4-1/16" 5000# Tubing Head Adapter. Run control line through adapter and test pack off to 3500 psi. Nipple up 4-1/16" CIW 5000# tree and test tree to 4000 psi. Open annulus valve and pulled TWC with dry rod. Dropped Balllrodlroller assembly down tubing. Rig up line to tubing for pressure test. Pressure on to tubing to 2500 psi to set packer, continued pressuring up to 3000 psi with rig pump. Switched to test pump and continued pressuring up slowly to 3800 psi and suddenly lost pressure on tubing to 400 psi. No flow on annulus. Printed: 9/2/2003 9:55:32 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 9/1/2003 10:00 - 10:30 ..... .. " ~-~ BP EXPLORATION Operations Summary Report MPS-34 MPS-34 ORIG DRILLING DOYON DRILLING INC. DOYON 14 0.50 CASE P Page 8 of 8 Start: 8/10/2003 Rig Release: Rig Number: Spud Date: 8/11/2003 End: Description of Operations PROD2 Attempted to pressure up on tubing and pumped 3 bbls and pressure on tubing increased to 800 psi and began pumping into formation. Appeared that the RHC plug sheared (set to shear at 4900 psi). Pressure test casing to 1000 psi for 10 minutes with no bleed off. Freeze protected 10-3/4" X 7-518" annulus with 95 bbls of diesel. Installed TWC and tested to 1000 psi from the top. RID circ. hoses and test eguip. secure well Rig Release @ 1500 hrs 9/1/2003 10:30 -11:30 1.00 CASE P PROD2 11 :30 - 12:00 0.50 WHSUR P PROD2 12:00 - 15:00 3.00 CASE P PROD2 Printed: 91212003 9:55:32 AM Legal Name: MPS-34 Common Name: MPS-34 Test Date 8/15/2003 8/22/2003 FIT FIT Test Type Test Depth (TMD) 5,546.0 (ft) 10,515.0 (ft) BP EXPLORATION Leak-Off Test Summary Test Depth (TVD) 2,893.0 (ft) 4,198.0 (ft) AMW 8.90 (ppg) 9.50 (ppg) Surface Pressure 400 (psi) 340 (psi) Leak Off Pressure (BHP) 1 ,738 (psi) 2,412 (psi) Page 1 of 1 EMW 11.56 (ppg) 11.06 (ppg) . . Printed: 912/2003 9:55:17 AM . AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-34 L2 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 10,153.41' MD 10,159.00' MD 13,454.00' MD (if applicable) . ð03 -JL/1 16-Sep-03 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment( s) - ~DN"'~ Sperry-Sun Drilling Services \..... MilnePoìntUhit BPXA MilnePoiñtMPS MPS-34L2 Job No. AKZZ0002600988, Surveyed: 28 August, 2003 Survey\Report 16 September, 2003 Your Ref: APlS00292317161 Surface Coordinates: 5999917.12 N, 565598.66 E . (70" 24' 36.7947" N, 149027' 57.0634" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999917.12 N, 65598.66 E (Grid) Surface Coordinates relative to Structure: 51.32 5, 746.82 W (True) Kelly Bushing: 72.30ft above Mean Sea Level Elevation relative to Project V Reference: 72.30ft Elevation relative to Structure: 72.30ft BI:3Elr"r"\ -SU" DFHLL.'NG SERViCeS A Halliburton Company DEFINITIVE . . Survey Ref: svy1256 , Sperry-Sunta~((!tlJl,~ervices Survey Report forMII".~/¡¡~1I("S.- MPS-34L2 Your Ref: A~/5tJ!!~92311161 Job No. AKZZ00026009BB, Surveyed: 2B August, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 10153.41 77. 760 341.880 4041.06 4113.36 3942.32 N 7401.22 W 6003794.28 N 558163.10 E 5167.63 Tie On Point 10159.00 77.660 342.220 4042.25 4114.55 3947.51 N 7402.90 W 6003799.46 N 558161.38 E 6.206 5173.04 Window Point 10202.92 82.060 344.160 4049.98 4122.28 3988.89 N 7415.39 W 6003840.73 N 558148.52 E 10.921 5215.96 10235.72 86.480 345.580 4053.26 4125.56 4020.39 N 7423.91 W 6003872.15 N 558139.73 E 14.147 5248.45 , 10267.93 87.840 346.970 4054.85 4127.15 4051.64 N 7431.54 W 6003903.33 N 558131.82 E 6.034 5280.56 "-- 1 0298.87 87.530 348.300 4056.10 4128.40 4081.83 N 7438.16W 6003933.47 N 558124.94 E 4.410 5311.44 . 10332.72 89.820 351.920 4056.88 4129.18 4115.16 N 7443.97 W 6003966.74 N 558118.83 E 12.651 5345.28 10364.96 90.560 353.040 4056.78 4129.08 4147.12 N 7448.19W 6003998.67 N 558114.33 E 4.164 5377.49 10395.26 90.370 353.370 4056.53 4128.83 4177.21 N 7451.77 W 6004028.72 N 558110.48 E 1.257 5407.74 10428.33 90.560 353.100 4056.26 4128.56 4210.05 N 7455.67 W 6004061.52 N 558106.30 E 0.998 5440.75 10460.21 89.320 355.660 4056.30 4128.60 4241.77 N 7458.79W 6004093.22 N 558102.90 E 8.922 5472.54 10490.84 88.640 358.590 4056.84 4129.14 4272.36 N 7460.33 W 6004123.79 N 558101.10 E 9.818 5502.92 10524.20 88.090 2.290 4057.79 4130.09 4305.70 N 7460.07 W 6004157.13 N 558101.06 E 11.208 5535.71 10556.23 87.840 6.100 4058.93 4131.23 4337.61 N 7457.73 W 6004189.07 N 558103.12 E 11.913 5566.74 10586.87 86.970 9.600 4060.32 4132.62 4367.93 N 7453.55 W 6004219.42 N 558107.03 E 11.759 5595.87 10618.98 87.470 11.750 4061.88 4134.18 4399.45 N 7447.61 W 6004250.98 N 558112.70 E 6.867 5625.87 10651.91 85.680 15.190 4063.84 4136.14 4431.41 N 7439.96 W 6004283.01 N 558120.07 E 11 .759 5656.02 10682.49 88.390 17.060 4065.43 4137.73 4460.74 N 7431.48 W 6004312.42 N 558128.29 E 10.762 5683.43 10732.57 88.950 20.810 4066.59 4138.89 4508.09 N 7415.23 W 6004359.91 N 558144.12 E 7.569 5727.24 10777.44 88.330 23.420 4067.65 4139.95 4549.64 N 7398.35 W 6004401.61 N 558160.64 E 5.977 5765.23 10827.89 89.880 27.390 4068.44 4140.74 4595.20 N 7376.71 W 6004447.35 N 558181.88 E 8.447 5806.34 10873.86 90.190 30.790 4068.41 4140.71 4635.36 N 7354.36 W 6004487.71 N 558203.87 E 7.427 5842.01 10924.01 91.300 32.370 4067.76 4140.06 4678.08 N 7328.10 W 6004530.66 N 558229.75 E 3.850 5879.52 . 10970.12 91.240 33.090 4066.74 4139.04 4716.86 N 7303.18 W 6004569.65 N 558254.33 E 1.567 5913.38 11019.92 91.110 36.170 4065.72 4138.02 4757.82 N 7274.89 W 6004610.86 N 558282.26 E 6.189 5948.81 11066.08 90.370 36.890 4065.12 4137.42 4794.91 N 7247.41 W 6004648.19 N 558309.41 E 2.237 5980.57 11116.30 87.280 35.830 4066.15 4138.45 4835.34 N 7217.65 W 6004688.88 N 558338.82 E 6.505 6015.21 11161.65 87.400 31.990 4068.26 4140.56 4872.93 N 7192.38 W 6004726.69 N 558363.76 E 8.462 6047.84 11210.40 87.280 35.180 4070.52 4142.82 4913.49 N 7165.45 W 6004767.49 N 558390.33 E 6.541 6083.11 11259.01 87.590 40.270 4072. 70 4145.00 4951.89 N 7135.74 W 6004806.14 N 558419.70 E 10.480 6115.77 11309.28 87.660 41.270 4074.78 4147.08 4989.93 N 7102.95 W 6004844.47 N 558452.16 E 1.992 6147.53 11354.54 87.960 40.770 4076.51 4148.81 5024.05 N 7073.26 W 6004878.85 N 558481.54 E 1.288 6175.98 11405.17 88.150 40.150 4078.23 4150.53 5062.55 N 7040.43 W 6004917.64 N 558514.04 E 1.280 6208.20 11451.18 88.520 39.330 4079.57 4151.87 5097.91 N 7011.03 W 6004953.26 N 558543.13 E 1.955 6237.92 11501.50 88.950 38.520 4080.68 4152.98 5137.05 N 6979.42 W 6004992.67 N 558574.39 E 1.822 6270.97 -~--- --------_._-_._--_.,-_.,-----_._---_._-~ 16 September, 2003 - 7:15 Page 20f5 DrillQuest 3.03.02.005 Sperry-Sun Qrilling Services Survey Report for MIlne PolntMPS . MPS·34L2 Your Rei: API 500:292317181 Job No. AKZZ0002600988, Surveyed: 28 August, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 11547.12 88.950 37.740 4081.51 4153.81 5172.93 N 6951.25 W 6005028.80 N 558602.24 E 1.709 6301.41 11596.00 89.810 38.990 4082.04 4154.34 5211.25N 6920.92 W 6005067.39 N 558632.24 E 3.104 6333.89 11642.81 89.880 38.450 4082.17 4154.47 5247.77 N 6891.64 W 6005104.16 N 558661.20 E 1.163 6364.77 11693.69 88.080 38.410 4083.07 4155.37 5287.62 N 6860.02 W 6005144.29 N 558692.46 E 3.539 6398.52 - 11738.82 88.270 38.370 4084.51 4156.81 5322,98 N 6832.01 W 6005179.89 N 558720.16 E 0.430 6428.48 11790.40 88.330 38.340 4086.04 4158,34 5363,41 N 6800,01 W 6005220.60 N 558751,80 E 0.130 6462.74 . 11835.12 92.470 38.410 4085.73 4158,03 5398.46 N 6772,26 W 6005255.89 N 558779.25 E 9.259 6492.43 11884.94 92.280 38.290 4083.66 4155.96 5437.50 N 6741.37W 6005295.20 N 558809.79 E 0.451 6525.52 11932.07 92.220 38.520 4081.81 4154.11 5474.40 N 6712.12 W 6005332.36 N 558838.72 E 0.504 6556.78 11981.51 92.720 36.700 4079.68 4151.98 5513.53 N 6681.98 W 6005371.75 N 558868.52 E 3.814 6590.08 12027.59 93.090 35.260 4077.35 4149.65 5550.77 N 6654.94 W 6005409.22 N 558895.23 E 3.223 6622.06 12079.92 93.400 34.290 4074.39 4146.69 5593.68 N 6625.14 W 6005452.40 N 558924.65 E 1.943 6659.15 12124.18 92.410 32.560 4072.14 4144.44 5630,57 N 6600.79 W 6005489.50 N 558948.67 E 4.499 6691.25 12174.32 92.280 32.890 4070.09 4142.39 5672.72 N 6573.71 W 6005531.88 N 558975.38 E 0.707 6728.05 12220.63 92.650 32.370 4068.10 4140.40 5711.68 N 6548.76 W 6005571.07 N 558999.99 E 1.377 6762.09 12271.02 91.300 33.360 4066.36 4138.66 5753.98 N 6521.43 W 6005613.60 N 559026.94 E 3.322 67¡ 9.00 12316.82 90,800 34.310 4065.52 4137,82 5792,02 N 6495.94 W 6005651.86 N 559052.10 E 2.344 6832.03 12366.49 90.000 35.180 4065.18 4137.48 5832,83 N 6467.63 W 6005692.92 N 559080.05 E 2.379 6867.31 12409.62 89.630 37.580 4065.32 4137.62 5867.55 N 6442.05 W 6005727.86 N 559105.32 E 5.630 6897.06 12464.03 89.440 38.760 4065.76 4138.06 5910.33 N 6408.43 W 6005770.93 N 559138.57 E 2.197 6933.35 12508.31 90.370 38.800 4065.83 4138.13 5944,84 N 6380.69 W 6005805.69 N 559166.00 E 2.102 6962.52 12557.81 90.740 38.700 4065.35 4137.65 5983.45 N 6349.71 W 6005844.57 N 559196,64 E 0.774 6995.16 12604.15 89.320 38.420 4065.33 4137.63 6019.68 N 6320.83 W 6005881.05 N 559225.21 E 3.123 7025.83 . 12654.22 89.570 38.550 4065.81 4138.11 6058.87 N 6289.67 W 6005920.52 N 559256.02 E 0.563 7059.01 12700.50 89.510 37.440 4066.18 4138.48 6095.34 N 6261.18 W 6005957.24 N 559284.19 E 2.402 7089.98 12750.32 89.440 36.850 4066.64 4138.94 6135.05 N 6231.10 W 6005997,21 N 559313.92 E 1.193 7123.87 12795.79 89.750 37.300 4066.96 4139.26 6171.33N 6203.69 W 6006033.72 N 559341.01 E 1,202 7154.83 12845.70 89.750 37.250 4067.18 4139.48 6211.04 N 6173.46 W 6006073,70 N 559370.89 E 0.100 7188.70 12891.87 88.700 37.260 4067.80 4140.10 6247,79 N 6145,51 W 6006110.69 N 559398.51 E 2274 7220.03 12941.66 86.600 37.070 4069.85 4142.15 6287.43 N 6115.46 W 6006150.60 N 559428.21 E 4.235 7253.85 12987.02 87.710 37.160 4072.10 4144.40 6323,56 N 6088.13 W 6006186.96 N 559455.23 E 2.455 7284.68 13036.96 87.840 37.470 4074.04 4146.34 6363.25 N 6057,88 W 6006226.91 N 559485.13 E 0.673 7318.51 13083.60 87.650 37.450 4075.87 4148.17 6400.24 N 6029.53 W 6006264,15 N 559513.15 E 0.410 7350.02 13134.23 89.380 38.450 4077.18 4149.48 6440.15 N 5998.41 W 6006304.34 N 559543.92 E 3.946 7383.92 13179.14 94.580 38.630 4075.63 4147.93 6475.24 N 5970.45 W 6006339.67 N 559571.57 E 11.586 7413.63 _.._------_.._,-~_...._._~-~._.,,-,..,._--_.., ..._--_._,.~----- 16 September, 2003 - 7:15 Page 3 of5 DrillQuest 3.03.02.005 BP EXPLORA nON (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 13229.94 94.320 38.860 4071.69 4143.99 13275.67 94.080 38.430 4068.34 4140.64 13326.60 93.710 38.650 4064.88 4137.18 13372.26 92.780 37.850 4062.30 4134.60 13386.37 92.960 38.390 4061.59 4133.89 13454.00 92.960 38.390 4058.10 4130.40 Sperry-SuntJI!JllilJf ~$erv;ces Survey Report for Milne 'Point MPS - MPS-34L2 Your Ref: API 500292317161 Job No. AKZZ0002600988, Surveyed: 28 August, 2003 BPXA Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (0/100ft) 6514.74 N 5938.75 W 6006379.45 N 559602.92 E 0.682 7447.02 6550.36 N 5910.27 W 6006415.32 N 559631.08 E 1.075 7477.16 6590.11 N 5878.61 W 6006455.34 N 559662.39 E 0.845 7510.80 6625.91 N 5850.39 W 6006491.39 N 559690.30 E 2.685 7541.15 6636.99 N 5841.69 W 6006502.55 N 559698.90 E 4.030 7550.56 6689.93 N 5799.75 W 6006555.85 N 559740.38 E 0.000 7595.41 Projected Survey . All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 350.000° (True). Magnetic Declination at Surface is 25.412°(11-Aug-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 13454.000., The Bottom Hole Displacement is 8853.94ft., in the Direction of 319.077° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 10153.41 10159.00 13454.00 4113.36 4114.55 4130.40 3942.32 N 3947.51 N 6689.93 N 7401.22 W 7402.90 W 5799.75 W 16 September, 2003 - 7:15 ,0 Comment . Tie On Point Window Point Projected Survey -----.---- Page 4 of5 DrillQuest 3.03.02.005 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Sperry-Sun Qtlllif!,iServices Survey Report for Milne PolntMPS .- MPS-34L2 Your Ref: API 600292317161 Job No. AKZZOOO2600988, Surveyed: 28 August, 2003 Survey tool program for MPS-34L2 \....- From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 278.90 0.00 278.90 278.89 13454.00 278.89 Tolerable Gyro (MPS-34) 4130.40 AK-6 BP JFR-AK (MPS-34) 16 September, 2003 - 7:15 Page 5 of 5 BPXA . ,tJ' . --------- DrillQllest 3.03.02.005 e AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 e Re: Distribution of Survey Data for Well MPS-34 L2 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey: Projected Survey: 10,153.41'MD 10,159.00' MD 13,454.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, Survey Manager Attachment( s) K~~YY\ ~ 603 ~I 1-/L{ 16-Sep-03 J , Sperry-Sun Drl!' ;g Services '",- Milne PöinfUnit BPXA Milne Poi"tftAPS MPS..34L.2<MWD . Job No. AKMW0002600988. SUl'ì/eyed: 28 August. 2003 Survey Report 16 September, 2003 Your Ref: AÞI500292317161 Surface Coordinates: 5999917.12 N, 565598.66E (70024'36.7947" H, 1490 27! 57.0634"!A1 Grid Coordinate System: HAD21 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 999917.12 N, 65598.66 E (Grid) Surface Coordinates relative to Structure: 51.32 S, 746.82 W (True) Kelly Bushing: 72.3Oft above Mean Sea Level Elevation relative to Project V Reference: 72.30ft Elevation relative to Structure: 72.30ft . Spl!!!:!r'.....\f-.UI1 OFHLL.tNG SEAVU:eS A Halliburton Company Survey Ref: svy1265 Sperry-Suné'lt¡ll¡Ij'll¿~eìvices Survey Report for Mllnefíof"'.t·"'''S~NlPS.34L2 MWD Your Ref: APfSQ0292317161 Job No. AKMWOO02600988, SUfl/tiyed: 28 August, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 10153.41 77.760 342.280 4041.79 4114.09 4024.60 N 7312.94 W 6003877.34 N 558250.66 E 5233.34 Tie On Point 10159.00 77.660 342.220 4042.98 4115.28 4029.80 N 7314.60 W 6003882.52 N 558248.95 E 2.074 5238.75 Window Point 10202.92 82.060 344.160 4050.71 4123.01 4071.18 N 7327.10 W 6003923.79 N 558236.09 E 10.921 5281.66 10235.72 86.480 345.580 4053.98 4126.28 4102.67 N 7335.61 W 6003955.21 N 558227.30 E 14.147 5314.16 \.. 10267.93 87.840 351.610 4055.58 4127.88 4134.19 N 7341.97W 6003986.67 N 558220.66 E 19.168 5346.31 "'- 1 0298.87 87.530 348.380 4056.83 4129.13 4164.64 N 7347.34 W 6004017.06 N 558215.03 E 10.4 79 5377.22 . 10332.72 89.820 352.130 4057.61 4129.91 4197.98 N 7353.07 W 6004050.36 N 558209.01 E 12.977 5411.05 10364.96 90.560 353.080 4057.51 4129.81 4229.95 N 7357.21 W 6004082.29 N 558204.58 E 3.735 5443.26 10395.26 90.370 353.330 4057.26 4129.56 4260.04 N 7360.80 W 6004112.34 N 558200.73 E 1.036 5473.51 10428.33 90.560 353.010 4056.99 4129.29 4292.87 N 7364.73 W 6004145.14 N 558196.51 E 1.125 5506.53 10460.21 89.320 355.840 4057.02 4129.32 4324.60 N 7367.83 W 6004176.84 N 558193.13 E 9.692 5538.31 10490.84 88.640 358.950 4057.57 4129.87 4355.19 N 7369.22 W 6004207.41 N 558191.47 E 10.392 5568.67 10524.20 88.090 2.490 4058.52 4130.82 4388.52 N 7368.80 W 6004240.76 N 558191.60 E 10.735 5601.43 10556.23 87.840 6.230 4059.66 4131.96 4420.44 N 7366.37 W 6004272.69 N 558193.75 E 11.695 5632.44 10586.87 86.970 9.550 4061.05 4133.35 4450.75 N 7362.17 W 6004303.04 N 558197.68 E 11.191 5661.56 10618.98 87.470 11.550 4062.60 4134.90 4482.28 N 7356.30 W 6004334.62 N 558203.28 E 6.413 56.~1.59 10651.91 85.680 15.090 4064.57 4136.87 4514.26 N 7348.73 W 6004366.66 N 558210.57 E 12.029 5721.77 10682.49 88.390 17.670 4066.15 4138.45 4543.55 N 7340.11 W 6004396.03 N 558218.92 E 12.228 5749.12 10732.57 88.950 21.750 4067.32 4139.62 4590.68 N 7323.23 W 6004443.30 N 558235.39 E 8.221 5792.60 10777 .44 88.330 24.020 4068.38 4140.68 4632.00 N 7305.79 W 6004484.77 N 558252.47 E 5.243 5830.27 10827.89 89.880 28.070 4069.17 4141.47 4677.31 N 7283.65 W 6004530.28 N 558274.21 E 8.594 5871.04 10873.86 90.190 31.410 4069.14 4141.44 4717.22 N 7260.84 W 6004570.39 N 558296.66 E 7.297 5906.39 10924.01 91.300 32.800 4068.49 4140.79 4759.70 N 7234.19 W 6004613.09 N 558322.94 E 3.547 5943.59 . 10970.12 91.240 33.400 4067.47 4139.77 4798.31 N 7209.02 W 6004651.93 N 558347.77 E 1.307 5977.25 11019.92 91.110 36.550 4066.45 4138.75 4839.11 N 7180.48 W 6004692.97 N 558375.95 E 6.329 6012.47 11066.08 90.370 37.320 4065.85 4138.15 4876.00 N 7152.75 W 6004730.11 N 558403.36 E 2.313 6043.98 11116.30 87.280 36.280 4066.88 4139.18 4916.20 N 7122.68 W 6004770.57 N 558433.08 E 6.492 6078.35 11161.65 87.400 32.410 4068.99 4141.29 4953.59 N 7097.12W 6004808.19 N 558458.30 E 8.529 6110.74 11210.40 87.280 35.340 4071.25 4143.55 4994.02 N 7069.98 W 6004848.85 N 558485.09 E 6.009 6145.84 11259.01 87.590 40.810 4073.43 4145.73 5032.23 N 7040.05 W 6004887.33 N 558514.69 E 11 .260 6178.27 11309.28 87.660 41.690 4075.51 4147.81 5069.99 N 7006.93 W 6004925.38 N 558547.47 E 1.755 6209.71 11354.54 87.960 41 .310 4077.24 4149.54 5103.87 N 6976.96 W 6004959.51 N 558577.14 E 1.069 623787 11405.17 88.150 40.740 4078.96 4151.26 5142.04 N 6943.75 W 6004997.98 N 558610.02 E 1.186 6269.69 11451.18 88.520 39.920 4080.29 4152.59 5177.10 N 6913.98 W 6005033.30 N 558639.47 E 1.955 6299.05 11501.50 88.950 39.030 4081.41 4153.71 5215.93 N 6882.00 W 6005072.41 N 558671.11 E 1.964 6331.74 --~_._.,-----~--- 16 September. 2003 - 7:18 Page 2 0'5 Dri/lQuest 3.03.02.005 ,. Sperry-Sun.~,.i~/i.tl"Sèrvices Survey Report for MllnePoln.fMP.S·MPS.34L2 MWD Your Ref: API 5Ò0292317161 Job No. AKMWOO02600988, Surveyed: 28 August, 2003 BP EXPLORA TlON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 11547.12 88.950 38.250 4082.24 4154.54 5251.56 N 6853.52 W 6005108.28 N 558699.28 E 1.709 6361.88 11596.00 89.810 39.610 4082.77 4155.07 5289.58 N 6822.81 W 6005146.57 N 558729.66 E 3.292 6393.99 11642.81 89.880 39.490 4082.90 4155.20 5325.68 N 6793.00 W 6005182.93 N 558759.14 E 0.297 6424.36 11693.69 88.080 38.710 4083.80 4156.10 5365.15 N 6760.92 W 6005222.68 N 558790.88 E 3.855 6457.66 11738.82 88.270 38.630 4085.24 4157.54 5400.37 N 6732.74 W 6005258.15 N 558818.75 E 0.457 6487.45 11790.40 88.330 38.900 4086.77 4159.07 5440.57 N 6700.45 W 6005298.63 N 558850.68 E 0.536 6521.44 . 11835.12 92.470 39.120 4086.46 4158.76 5475.31 N 6672.31 W 6005333.62 N 558878.52 E 9.271 6550.76 11884.94 92.280 38.990 4084.39 4156.69 5513.96 N 6640.95 W 6005372.54 N 558909.54 E 0.462 6583.38 11932.07 92.220 39.630 4082.54 4154.84 5550.40 N 6611.11 W 6005409.24 N 558939.05 E 1.363 6614.09 11981.51 92.720 37.310 4080.41 4152.71 5589.07 N 6580.39 W 6005448.18 N 558969.44 E 4.796 6646.83 12027.59 93.090 37.750 4078.08 4150.38 5625.57 N 6552.35 W 6005484.92 N 558997.15 E 1.247 6677.91 12079.92 93.400 35.180 4075.11 4147.41 5667.58 N 6521.30 W 6005527.21 N 559027.83 E 4.939 6713.89 12124.18 92.410 33.200 4072.87 4145.17 5704.14 N 6496.47 W 6005563.98 N 559052.34 E 4.996 6745.58 12174.32 92.280 33.650 4070.82 4143.12 5745.96 N 6468.87 W 6005606.04 N 559079.57 E 0.933 6781.97 12220.63 92.650 33.330 4068.83 4141.13 5784.54 N 6443.34 W 6005644.85 N 559104.76 E 1.056 6815.54 12271.02 91.300 34.250 4067.09 4139.39 5826.39 N 6415.33W 6005686.94 N 559132.40 E 3.241 6~p1.89 12316.82 90.800 34.930 4066.25 4138.55 5864.09 N 6389.34 W 6005724.87 N 559158.06 E 1.843 6884.50 12366.49 90.000 35.800 4065.90 4138.20 5904.59 N 6360.59 W 6005765.62 N 559186.45 E 2.379 6919.39 12409.62 89.630 38.040 4066.04 4138.34 5939.07 N 6334.68 W 6005800.33 N 559212.06 E 5.264 6948.85 12464.03 89.440 39.090 4066.49 4138.79 5981.61 N 6300.77 W 6005843.16 N 559245.60 E 1.961 6984.86 12508.31 90.370 39.070 4066.56 4138.86 6015.99 N 6272.85 W 6005877.78 N 559273.21 E 2.101 7013.86 12557.81 90.740 39.290 4066.08 4138.38 6054.36 N 6241.58 W 6005916.42 N 5593.04.14 E 0.870 7046.22 12604.15 89.320 38.790 4066.06 4138.36 6090.35 N 6212.40 W 6005952.67 N 559333.01 E 3.249 7076.59 . 12654.22 89.570 38.890 4066.54 4138.84 6129.34 N 6181.00 W 6005991.94 N 559364.07 E 0.538 7109.54 12700.50 89.510 37.370 4066.91 4139.21 6165.75 N 6152.42 W 6006028.59 N 559392.32 E 3.287 7140.43 12750.32 89.440 37.050 4067.37 4139.67 6205.42 N 6122.29 W 6006068.53 N 559422.10 E 0.657 7174.27 12795.79 89.750 37.440 4067.69 4139.99 6241.62 N 6094.78 W 6006104.97 N 559449.30 E 1.096 7205.14 12845.70 89.750 37.260 4067.91 4140.21 6281.29 N 6064.50 W 6006144.91 N 559479.23 E 0.361 7238.96 12891.87 88.700 37.360 4068.53 4140.83 6318.01 N 6036.51 W 6006181.87 N 559506.89 E 2.284 7270.26 12941.66 86.600 37.170 4070.57 4142.87 6357.60 N 6006.39 W 6006221.72 N 559536.66 E 4.235 7304.01 12987.02 87.710 37.350 4072.82 4145.12 6393.66 N 5978.97 W 6006258.02 N 559563.77 E 2.479 7334.76 13036.96 87.840 37.520 4074.76 4147.06 6433.28 N 5948.63 W 6006297.91 N 559593.75 E 0.428 7368.52 13083.60 87.650 37.860 4076.60 4148.90 6470.16 N 5920.14 W 6006335.04 N 559621.92 E 0.835 7399.89 13134.23 89.380 38.830 4077.91 4150.21 6509.85 N 5888.74 W 6006375.00 N 559652.97 E 3.917 7433.52 13179.14 94.580 39.360 4076.36 4148.66 6544.68 N 5860.45 W 6006410.07 N 559680.96 E 11 .639 7462.90 --..-~-----_."-- 16 September, 2003 - 7:18 Page 3 of 5 Dri/lQuest 3.03.02.005 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 13229.94 94.320 39.220 4072.42 4144.72 13275.67 94.080 39.160 4069.07 4141.37 13326.60 93.710 39.400 4065.61 4137.91 13372.26 92.780 38.480 4063.02 4135.32 13386.37 92.960 39.040 4062.32 4134.62 13454.00 92.960 39.040 4058.83 4131.13 Sperry-Sun Drilling Services Survey Report for Milne Point MPS - MPS-34L2 MWD Your Ref: API 500292317161 Job No. AKMWOO02600988, Surveyed: 28 August, 2003 BPXA Local Coordinates Global Coordinates Dogleg Vertical Northings Eastlngs Northings Eastings Rate Section Comment (ft) (~) (ft) (ft) ('/100ft) 6583.87 N 5828.37 W 6006449.55 N 559712.68 E 0.581 7495.94 6619.22 N 5799.56 W 6006485.15 N 559741.19 E 0.541 7525.74 6658.55 N 5767.39 W 6006524.76 N 559773.01 E 0.865 7558.89 6694.01 N 5738.74 W 6006560.47 N 559801.35 E 2.863 7588.84 6705.00 N 5729.91 W 6006571.54 N 559810.08 E 4.164 7598.13 6757.46 N 5687.37 W 6006624.37 N 559852.16 E 0.000 7642.40 Projected Survey . All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 350.000' (True). Magnetic Declination at Surface is 25.412'(11-Aug-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 13454.00ft., The Bottom Hole Displacement is 8832.30ft., in the Direction of 319.915' (True). Comments .'-" Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 10153.41 10159.00 13454.00 4114.09 4115.28 4131.13 7312.94 W 7314.60 W 5687.37 W 4024.60 N 4029.80 N 6757.46 N 16 September, 2003 - 7:18 Comment . Tie On Point Window Point Projected Survey Page 4 of 5 DrillQuest 3.03.02.005 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit Sperry-Sun Drilling ~ervices Survey Report for MIlne Po/ntMPS ~ .S·34L2 MWD Your Ref: APlSO02g2317181 Job No. AKMWOO02600.988, surveyed: 28 August, 2003 Survey tool proøram for MPS-34L2 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 278.90 0.00 278.90 278.89 13454.00 278.89 Tolerable Gyro (MPS-34 MWD) 4131.13 MWD Magnetic (MPS-34 MWD) 16 September, 2003 - 7:18 Page 5 0'5 BPXA . ,. . "~----",---..__.~_._--,._-,-- DrillQuest 3.03.02.005 . . I~ J ~ ru) ~/ FRANK H. MURKOWSKI, GOVERNOR AI,ASIiA. ORAND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Matt Green Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Milne Point Unit MPS-34L2 BP Exploration (Alaska), Inc. Pennit No: 203-144 Surface Location: 3252' NSL, 412' WEL, Sec. 12, T12N, RlOE, UM Bottomhole Location: 4582' NSL, 1005' WEL, Sec. 02, T12N, R10E, UM Dear Mr. Green: Enclosed is the approved application for pennit to redrill the above development well. This pennit to redrill does not exempt you from obtaining additional pennits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required pennits and approvals have been issued. In addition, the Commission reserves the right to withdraw the pennit in the event it was erroneously issued. The pennit is for a new wellbore segment of existing well MPS S-34, Pennit No 203-130, API 50-029-23171-00. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the tenns and conditions of this pennit may result in the revocation or suspension of the pennit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~d;lue~ ~ Commissioner BY ORDER OF THE COMMISSION DATED thisLî day of August, 2003 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration, Production and Refineries Section 'STATE OF ALASKA _ ALASKA (J .... AND GAS CONSERVATION CO~SION PERMIT TO DRILL 20 AAC 25.005 11b. Current Well Class 0 Exploratory o Stratigraphic Test 0 Service 5. Bond: 181 Blanket 0 Single Well Bond No. 2S100302630-277 6. Proposed Depth: MD 13387' . TVD 4132' 7. Property Designation: ADL 380109 ,/ o Drill iii Redrill 1a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3252' NSL, 412' WEL, SEC. 12, T12N, R10E. UM Top of Productive Horizon: 2397' NSL, 2627' WEL, SEC. 02, T12N, R10E, UM Total Depth: 4582' NSL, 1005' WEL, SEC. 02, T12N, R10E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: X-565599 y- 5999917 Zone-ASP4 16. Deviated Wells: Kickoff Depth 10092 ft Maximum Hole Angle Grade Coupling Length MD TVD MD TVD (includinç¡ staç¡e data) L-80 BTC 3295' 10092' 4097' 13387' 4132' Uncemented Slotted Liner Hole 6-1/8" Casinç¡ 4-1/2 Weiç¡ht 12.6# ~Á¡l~ ~ '61It{ iii Development Oil 0 Multiple Zone o Development Gas 0 Single Zone 11. Well Name and Number: MPS-34L2 12. Field / Pool(s): Milne Point Unit I Schrader Bluff 8. Land Use Permit: Milne Point Unit 9. Acres in Property: 2560 13. Approximate Spud Date: August23,2003 14. Distance to Nearest Property: 2700' 92° 10. KB Elevation Planned 15. Distance to Nearest Well Within Pool (Height above GL): KBE = 72' feet MPH-07A is 750' away at 10092' 17. Anticipated pressure (see 20 AA9 25.035) . Max. Downhole Pressure: 1966 psig. Max. Surface Pressure: 1545 psig PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD 11159' 4322' None NIA J NIA ,:,:,,"-'; ,:,:..,:>,,::.,:.,..:,.-,.,. Structural Conductor 75' 20" 260 sx Arctic Set (Approx.) 110' 110' Surface 5484' 10-3/4" 935 sx PF 'L'. 375 sx Class 'G' 5518' 5446' Intermediate (Top Job) 54 sx PF 'L' Production 11104' 7-5/8" 255 sx PF 'E', 434 sx Class 'G' (Approx.) Approx. 11104' 4309' Liner 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Matt Green Title Drilling Engineer f!fr()~ Permit To Drill ., // / I API Number: Number: 2.fX3-/y'-I 50-029-23171-61-00' Conditions of Approval: Samples Required Hydrogen Sulfide Measures Other: -SSOO('s \ tsD \' ~<.". \- Perforation Depth MD (ft): None 20. Attachments 181 Filing Fee 0 BOP Sketch o Property Plat 0 Diverter Sketch Signature IPerfOration Depth TVD (ft): None 181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis o Seabed Report 0 Drilling Fluid Program 18120 AAC 25.050 Requirements Date: Contact Matt Green, 564-5581 ~ Prepared By Name/Number: Phone 546-5581 Date \C{ oJ Sondra Stewman, 564-4750 Commission Use Only ,. 16:~~it APProv~~ /IC~ C:7 1 ~t~~~:;~i~~~~~~: DYes 3No Mud Log ReqUir~~ 0 Ye$~o DYes .l8,fNo Directional Survey Required fi(les 0 No Approved Bv: ~0 Form 10-401 Revised 3/2003 ~,.4- ""- BY ORDER OF ---.... COMMISSIONER THE COMMISSION (1 L) I ~ ¡ ~dl\ I . Date ~7/Ð7 S~i~ln &;cIte It Milne P&PS-34 Well Permit IWell Name: I MPS-34 L2 Drill and Complete Plan Summary I Type of Well (service I producer I injector): I Multi Lateral Producer "NE" 1/ Surface Location: 2028' FNL, (3251' FSL), 412' FEL, (4867' FWL), SEC. 12, T12N, R10E E=565598.69 N=5999916.85· 2883' FNL, (2397' FSL), 2627' FEL, (2653' FWL), SEC. 2, T12N, R10E E=558066 N=6004280 Z=4112'TVD 698' FNL, (4582' FSL), 1005' FEL, (4274' FWL), SEC. 2, T12N, R10E E=559668 N=6006478 Z=4132' TVD Target Location: TOP "NE" Target Location: BHL "NE" Well TD I AFE Number: I TBD I Rig: 1 Doyon 14 I I Estimated Start Date: 123 Aug 2003 I Operating days to complete: 114 1 I MD: 113387 I- I TVD: 14132 I ~ I Max Inc: 192 1 I KOP: 1100921 I KBE: 172 1 I Well Design (conventional, slimhole, etc.): 1 Conventional Grass Roots ML Producer I . Objective: Schrader Bluff NE This lateral was added to the well to replace the OB lateral that was cancelled when water was encountered in the pilot hole. The NE lateral will be completed with a hook hanger and the OA lateral will be completed with a liner top packer. Mud Program: 6.125-in Production Hole Mud Properties: KCI-CaCOs FloPro Density (ppg) I PV I YP I HTHP pH API Filtrate 9.0-9.2 10-20 25-30 10-11 9.0-9.5 <6 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR. MBT <7 Evaluation Program: 6.125-in Hole section: / Open Hole: MWD/GRlRES, ABI/IFRlCASANDRA Cased Hole: N/A 1 - Milne PO&PS-34 Well Permit Formation Markers Formation Tops MOrkb TVDrkb Pore Pressure Estimated EMW (ft) (ft) (psi) (Ib/gal)* Base Permafrost 2040 1822 8.35 TUZC 8091 3567 1548 8.35 NA 9938 4057 1761 8.35 NB 10014 4077 1770 8.35 NC 10091 4097 1778 8.35 ~ NE 10131 4107 1783 8.35 NF 10314 4152 1802 8.35 Top OA 10422 4177 1813 8.35 Base OA 10537 4202 1966 9.0 Top OB 10738 4242 1841 8.35 TO 11104 4309 1870 8.35 ý * Based on 55 depths Casinf=/Tubing Program Hole Size Csg/ Wt/Ft Grade Conn Length Top Bottom Tbg O.D. MD / TVDrkb MD / TVDrkb 42-in 20-in* 92# H-40 Welded 80' 0' 112' 1 112' 13.5-in 10.75-in 45.5# L-80 BTC-M 5491' 0' 5491 '/2892' 9.875-in 7.625-in 29.7# L-80 BTC-M 111 04' 0' 11104/4309 6.125-in 4.5-in 12.6# L-80 BTC 3295' 10,092/4097 13,387/4132' NE Slotted J 6.125-in 4.5-in 12.6# L-80 BTC 2701' 10,253/4137 13,376/4202' OA Slotted * The 20-in conductors are insulated. Recommended Bit Program BHA Hole Size Depth (MD) Bit Type Nozzle/Flow rate 1 13.5-in 0' - 5491 ' Smith MGXi 3-15 & 1-1 0 2 9.875-in 5491'-11104' Smith FGXiCPS 3-15 & 1-1 0 3 6.125-in 10253' - TO Security FM2643 3-12 4 6.125-in 10625' - TO Security FM2643 3-12 2 e Milne Pc. IIIIPS-34 Well Permit Well Control: Surface hole will be drilled with a diverter. Intermediate hole: · Maximum anticipated BHP: · Maximum surface pressure: Kick tolerance: · Planned completion fluid: 1,966-psi @ 4,202-ft TVDrkb - Top of "OA" ,/ 1 ,545-psi @ surface / (Based on BHP and a full column of gas from TD @ 0.1-psi/ft) 3,500-psi. An FIT to 11.5-lb/gal will be made on the 10.75-in casing shoe. 89-bbl with 9.2-lb/gal mud. 9.7-lb/gal brine / 7.0-lb/gal Diesel (1 ,800-ft MD). · Planned BOP test pressure: · Integrity test: Drilling Hazards & Contingencies: Hydrates · Hydrates have not been seen on S pad, but has been encountered in the surface holes on other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. · Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation ../ · We do not expect losses while drilling this well. · Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.35 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1-lb/gal mud. -,. -- 3 e Milne P"PS-34 Well Permit Pad Data Sheet · Please Read the S-Pad Data Sheet thoroughly. Breathing · N/A Hydrocarbons · Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults · NA Hydrogen Sulfide · MPS Pad is not designated as an H2S Pad. Anti-collision Issues · MPS-34 has no anti-collision issues. r 4 e Milne P&PS-34 Well Permit DRILL & COMPLETION PROCEDURE Pre-Rig Operations 1. The 20-in insulated conductor is installed 2. NU diverter Procedure 1. MI/RU Doyon 14 2. Function test diverter, PU 4.0-in drill pipe 3. Drill 13.5-in surface hole 4. Run and cement 1 O.75-in casing 5. ND diverter, install wellhead, NU BOPE and test 6. Drill 9.875-in intermediate hole 7. Run and cement 7.625-in casing 8. Set whipstock and mill window for OA 9. Drill 6.125-in OA horizontal production hole 10. Run 4.5-in slotted liner -'/ 11. Run whipstock and mill window for NE lateral ~ 12. Drill 6.125-in NE horizontal production hole 13. Retrieve whipstock 14. Run 4.5-in slotted liner and hang off in 7.625-in casing V 15. Displace drilling mud to brine 16. Run 4.5-in jet pump completion \ \ 17. N D /N U -\- N''7 18. Freeze protect well _ { 19. RD/MO pCè.f'\1"\..~ 5 TREE: Cameron 4-1/16" 5M WELLHEAD: FMC Gen 5 11 ", 5M Tubing Head: 11" x 4-1/2", FMC Tubing Hanger M.-~¡~f\~~1~~'~~. I KB. ELEV =66' I Cellar Box ELEV = 38.5' 9.2 KCL with corrosion inhibitor as packer fluid 112' 20" 92 Ib/tt, H-40 Welded ;/ Insulated Diesel Freeze protect to 750' MD 10-3/4" 45.5#, L-80, BTC-M Casing Drift: 9.875 Casing ID: 9.950 Coupling OD: 11.75" Burst: 5,210 psi Collqpse: ::> .480 psi . .... ..., Pomp '0'''''''' '0 / III Sliding Sleeve Post rig! 7-5/8" 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing ID: 6.875 Coupling OD: 11.75" Burst: 6,890 psi Collapse: 4,790 psi . ----- -------- Window in 7-5/8" casing @ 10,092' Well Inclination @ Window = 76 deg ... 42" Hole 4-1/2" x 1" Gas Lift Mandrel @ 2,267' MD, 2080' TVD, RP shear valve open position, "X" Nipple (2.813" ID) 70' below GLM 4-1/2", 12.6 Ib/ft, L-80, IBT-M Coupling 00: 5.2" OriftllO: 3.833" Burst: 8,430, 80% 6,744 psi Collapse: 7,500, 80%=6,000 psi "..... 110-314" @ 5,518'MD; 2,894' TVD BIW 1- Wire Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down to lower sensor) Halliburtion Dura Sleeve XD W/X Nipple (3.813" 10) Phoenix Pressure Gauge (2.840" 10) 7-5/8" x 4-1/2" Premier Packer ISet @ 7630'MD, 4274' TVD I 3-1/2" HES 'XN' nipple 2.750" 10 No Go W/RHC-M for ball & rod Wireline Entry Guide \ \~ /10,092' I 13,387' Multi-Lateral Junction ...... -- - - -- NE Horizontal 6-1/8" hole ~~- - - 4-1/2" Slotted LinerW/lloCi!-wa Top liner @ 10,575' MD- , ~ Window in 7-5/8" casing @ 10,253' Well Inclination @ Window = 79 deg 7-5/8" PBTD @ 11,020' MD 7-5/8" Casing Shoe @ 11,104' MD Well Inclination @ Shoe = 79 Degrees þ~///ML . ¡Z-VA1?Wh-. PB1 DATE 12/19/02 REV. BY SKC COMMENTS Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion - - -- 9-7/8" Hole ~~ Multi-Lateral Junction 1 10,253' 1 6-1/8" OA Lateral TO 113,376' 1 - - - -- - - OA Horizontal 6-1/8" hole L1 - - - - _.- - - 4-1/2" Slotted Liner W/liner hanger Milne Point Unit WF : MPS-34 PB1. 1 & 2 API #: 50-029-23171-70. 50-029- 23171-60 & 50-029-23171-61 COMPANY DETAILS BP Amoco REFERENCE INFORMA nON Co-ordinate (NÆ) Reference: Well Centre: Plan MPS-34, Tme North Vertical (1VD) Reference: S-Pad Dev 72.00 Section (VS) Relèrence: User Defined (3895.72N,-736329E) Measured Depth Reference: S-Pad Dev 72.00 Calculation Method: Minirnwn Curvature Calculation Method: Minimum Curvature Error System: ISCWSA Scan Method: Trav Cylinder North Error Surface: Elliptical + Casing Warninp; Method: Rules Based o ~ .... '§ , #',§> ,.,. # ~ s§> ~ 6'000 èoO ÕOOO $000 aOa~OOO ~4' <'000 0 /' /000 ¿§i' '/000 " c :§ o o :!. ..c Õ. Ö "N 'J': ~ 2 f- 4400 Start Dir 12/100': 10092' MD, 4097.04'TVD EndDir : 10219.11'MD,4112.95'TVD Start Dir 11/100': 10394.24' MD, 41 1 1.75'TVD Start Dir9/100': 10650.03' MD, 4112'TVD End Dir : 11003.47' MD, 4116.09' TVD I, II '- I ;..~ 1;,;1,.: ; : ,. .1Ih I Inn' I i¡I" '~~' \U. :':'1 ;...": \ ) I ¡ lid I>II! II-I·,t. ::oY \11), 11::1 -, I 'J \ d I . 11'1': ,j I":' ',', \1" I :.: )1: I':.;.~:·.' \;,). :',:9: 1'1 ': \0 "NJ'r \.) :-':.. ~ I)¡ o 400 800 1200 1600 Vertical Section at 28.73" [400ft/in] 2800 SURVEY PROORAM Depth Fm Depth To SurveylPlan 10092,00 13386.75 Plarmed: MPS.34 NE wp01 VI I Date: 7/23/2003 Plan: MPS-34 NE wpOl (Plan MPS-34/Plan MPS-34 NE) Tool MWD+IFR+MS Created By: Ken Allen Checked: Dale Rcviewed: Dale WELL DETAILS N_ +N/-S +EI-W Northing Basting Latitude Longitude Slot Plan MPS-34 -54.52 -746.89 5999916.85 565598.69 70024'36.792N 149°27'57,{l63W NlA TARGET DETAILS N_ TVD +N/-S +EI-W Northing &.tmg Shape MPS-34 NE T4 4092.00 5733.25 -6529.21 6005592.00 559020.00 Point MPS-34 NE T2 4112.00 4429.56 -7494.79 6004280.00 558066.00 Point MPS-34 NE T3 4122.00 5084.94 -7072.98 6004939.00 558482.00 Point MPS-34 NE T5 4132.00 6613.61 -5873.40 6006478.00 559668.00 Point SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target I 10092.00 75.18 338.81 4097.04 3895.72 -7363.29 0.00 0.00 7802.28 2 10112.00 77.58 338.81 4101.75 3913.84 -7370.31 12.00 0.00 7820.49 3 10219.11 90.39 339.88 4112.95 4013.31 -7407.80 12.00 4.80 7919.76 4 10394.24 90.39 339.88 4111.75 4177.74 -7468.05 0.00 0.00 8082.71 5 10650.03 89.50 8.00 4112.00 4429.56 -7494.79 11.00 91.79 8288.75 MPS-34 NE T2 6 11003.47 89.21 39.81 4116.09 4748.52 -7353.42 9.00 90.70 8433.37 e 7 11421.13 89.21 39.81 4121.86 5069.33 -7086.04 0.00 0.00 8495.69 8 11441.48 90.00 40.00 4122.00 5084.94 -7072.98 4.00 13.51 8498.70 MPS-34 NE T3 9 11496.53 92.20 40.08 4120.94 5127.08 -7037.57 4.00 2.19 8506.69 10 12212.46 92.20 40.08 4093.45 5674.43 -6576.92 0.00 0.00 8610.07 11 12288.22 90.00 38.00 4092.00 5733.25 -6529.21 4.00 -136.54 8622.37 MPS-34 NE T4 12 12351.73 87.85 36.64 4093.19 5783.74 -6490.72 4.00 -147.78 8634.56 13 13386.75 87.85 36.64 4132.00 6613.61 -5873.40 0.00 0.00 8845.15 MPS-34 NE T5 FORMATION TOP DETAILS No. TVDPath MDPath Fonnation 4097.00 10091.83 SBE4-NC 4107.00 10140.20 SBE2-NE CASING DETAILS No. TVD MD Name Size All TVD depths are ssTVD plus 72'forRKBE. 4132.00 13386.74 41/2" 4.500 e :':;11::, Total Depth: 13386.75' MD,4132' TVD ~ I )/'. "..""",,,:{ ';;""'f' ~\ ! \::'·S-.:( I Plar. \: : ~- '¡ ~ (). \: MPS-34 NE wpOI 41/2" 2000 I . I I 3200 2400 Plan: MPS-34 NE wpOl (plan MPS-34/Plan MPS-34 NE) Created By: Ken Allen Checked: Reviewed: Date: Date: SURVEY PROGRAM Depth Fm Depth To SurveylPlan To, 10092.00 13386.75 Planned: MPS-34 NE wpOl VI MWD+IFR+MS - WELL DETAn.s N= +NI-" +EI-W Northing Easting Latitude Longitude Slot Plan MPS-34 -54.52 -746.89 5999916.85 565598.69 70024'36.792N 149"27'57.063W NiA TARGET DETAILS ""'" TVD +Ni-S +EI·W Northing Easting Shape MPS-34 NE T4 4092.00 5733.25 -6529.21 6005592.00 559020.00 Point MPS-34 NE 1'2 4112.00 4429.56 -7494.79 6004280.00 558066.00 Point MPS-34 NE D 4122.00 5084.94 -7072.98 6004939.00 558482.00 Point MPS-34 NE T5 4132.00 6613.61 -5873.40 6006478.00 559668.00 Point SECTION DETAILS See MD Ine Azi TVD +N/-S +E/-W DLeg TFaee VSee Target I 10092.00 75.18 338.81 4097.04 3895.72 -7363.29 0.00 0.00 0.00 2 10112.00 77.58 338.81 4101.75 3913.84 -7370.31 12.00 0.00 12.52 3 10219.11 90.39 339.88 4112.95 4013.31 -7407.80 12.00 4.80 81.72 4 10394.24 90.39 339.88 4111.75 4177.74 -7468.05 0.00 0.00 196.95 5 10650.03 89.50 8.00 4112.00 4429.56 -7494.79 11.00 91.79 404.91 MPS-34 NE T2 6 11003.47 89.21 39.81 4116.09 4748.52 -7353.42 9.00 90.70 752.56 e 7 11421.13 89.21 39.81 4121.86 5069.33 -7086.04 0.00 0.00 1162.40 8 11441.48 90.00 40.00 4122.00 5084.94 -7072.98 4.00 13.51 1182.37 MPS-34 NE T3 9 11496.53 92.20 40.08 4120.94 5127.08 -7037.57 4.00 2.19 1236.33 10 12212.46 92.20 40.08 4093.45 5674.43 -6576.92 0.00 0.00 1937.74 11 12288.22 90.00 38.00 4092.00 5733.25 -6529.21 4.00 -136.54 2012.25 MPS-34 NE T4 12 12351.73 87.85 36.64 4093.19 5783.74 -6490.72 4.00 -147.78 2075.03 13 13386.75 87.85 36.64 4132.00 6613.61 -5873.40 0.00 0.00 3099.47 MPS-34 NE T5 ,/ 3386.75' MD, 4132' T\ REFERENCE INFORMATION Co-ordinatc (NÆ) Reference: Well Centre; Plan MPS-34, True North Vertical (TVD) Reference: S-Pad Dev 72.00 Section (VS) Reference: User Defined (3895.72N.-736329E) Measured Depth Reference: S-Pad Dev 72.00 Calculation Method: Minimum Curvature FORMATION TOP DETAILS No. TVDPath MDPath Formation 1 4097.00 10091.83 SBE4-NC 2 4107.00 10140.20 SBE2-NE CASING DETAILS No. TVD MD Name Size I 4132.00 3386.74 41/2" 4.500 " COMPANY DETAILS BP Amooo Calculation Method: Minimum Curvature ~~::': ~=~ ~;v~~~nderNorth Error Surface: ElJiplica1 + Casing Waminl/: Method: Ru1esBased I [' i . h" t ...............\IJ~],l.~L.I~....'.../. \lrS·.1J 'L" .,¡'J!:..-....----.-.....,. . '\ -- , . L.. -)":1 J /1 /i / 1 : 1-/ i I -' >.......-..........-- . ' . -...........-.... . / ¡ '., ,..! .;. I':, - ! ,_~ I ,,,I V;r 1 L" :">!.III.1 OU' ."'gOI All TVD depths are ssTVD plus 72'for RKBE. r I I i i I 1 ! ;\ 6600--- e , ~ 6"t.òo ~o 't.òo ~ ' --Jf"" /t.òo /' .# '/~ o dP I ,¡P ;JP I ~4' / " , #' #' , #' # ;-: v 4õ'TVD. , I ' -5400 .¡' ';'1;',1. : '. Y \fI). :24', \1 I -bUUU I I I I V I 'b'l \'1) -- j West(-)Æast(+) [600ft/in] ¡H' .~ 1 \1lJ.~:~ I.: .;. \11> ; \[) \fl'~- I \. *N7.0..:: \. I> l i : \fI'.~:;.;, : ./ :L' / 0....." ~..~.."'.. = I ...-........ . , ........"'..."..;" ;. \1 I'.. 4S)-{:-' I : .......' Ln.:!).." :' : ~:.:¡---- ,~:,.',-, ; ~:"'~,;; r-----.. I..'" \lI'S .. ...... ? . ,- /. ....[;:41>".·< . . ' . : .1- ~.- - r \1I'S· ~I I'll 1)9' .\ '1~' l' 4 \11>. ~ '. \1 \-11>. (llI"l' ~. ' \1 4 \,1 .' .;4 \1 I I' ; Iih:,,1 I ¡I ¡ :t-......."........;._.~ I S..~n PII' II :ii '. i ~, i '. I";;d Ik o:!'_ \' '" I "'I.:~: ). ....~......._._" 6000- _. i I I : ! 5400- -:-1 ... ! i i ¡ ,-. L-' ì I I i ! t ; -7M " :§ o o ~ +' :E' t: ~ ..c: " o '" e BP KW A Planning Report Company: Field: Site: Well: Wellpath: BP Amoco Milne Point MPt S Pad Plan MPS-34 Plan MPS-34 NE Date: 7/23/2003 Time: 16:18:36 Page: Co-ordinate(NE) Reference: Well: Plan MPS-34, True North Vertical (TVD) Reference: S-Pad Dev 72.0 . Section (VS) Reference: User (3895.72N,-7363.29E,28.73Azi) Survey Calculation Mcthod: Minimum Curvature Db:Öracle ......._-~-~ ! Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Site: M pt S Pad Site Position: From: Map Position Uncertainty: Ground Level: 5999978.00 ft 566345.00 ft Northing: Easting: Latitude: 70 24 Longitude: 149 27 North Reference: Grid Convergence: 0.00 ft 0.00 ft Well: Plan MPS-34 Slot Name: Well Position: +N/-S -54.52 ft Northing: 5999916.85 ft +E/-W -746.89 ft Easting: 565598.69 ft Position Uncertainty: 0.00 ft Latitude: Longitude: Well path: Plan MPS-34 NE Drilled From: Tie-on Depth: 72.00 ft Above System Datum: Declination: Mag Dip Angle: +E/-W ft -7363.29 Current Datum: Magnetic Data: Field Strength: Vertical Section: S-Pad Dev 7/23/2003 57538 nT Depth From (TVD) ft 7802.28 +N/-S ft 3895.72 Height Plan: MPS-34 NE wp01 Date Composed: Version: Tied-to: Principal: Yes Casing Points e Alaska, Zone 4 Well Centre bggm2003 37.329 N 35.171 W True 0.51 deg 70 24 36.792 N 149 27 57.063 W Plan MPS-34PB1 10092.00 ft Mean Sea Level 25.26 deg 80.84 deg Direction deg 28.73 7/23/2003 1 From: Definitive Path MD TVD Diameter Hole Size Name ft ft in in -1 13386.74 4132.00 4.500 6.125 41/2" Formations MD TVD Formations Lithology Dip Angle . . Dip Direction ft ft deg deg 10091.83 4097.00 SBE4-NC 0.00 0.00 10140.20 4107.00 SBE2-NE 0.00 0.00 Targets __u ..._h....._.__.________.....___.... ------ "·'-'-'1 Map Map <-- Latitude·--> <- Longitude -> . Name Description TVD +N/-S +EI-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft ---......-...... .~-_. MPS-34 NE T4 4092.00 5733.25 -6529.21 6005592.00 559020.00 70 25 33.149 N 149 31 8.583 W MPS-34 NE Poly 4107.00 4482.16 -7221.29 6004335.00 558339.00 70 25 20.839 N 149 31 28.849 W -Polygon 1 4107.00 4482.16 -7221.29 6004335.00 558339.00 70 25 20.839 N 149 31 28.849 W -Polygon 2 4107.00 6652.77 -5549.01 6006520.00 559992.00 70 25 42.201 N 149 30 39.851 W -Polygon 3 4107.00 6972.97 -5908.24 6006837.00 559630.00 70 2545.347 N 149 30 50.397 W -Polygon 4 4107.00 4487.33 -7809.33 6004335.00 557751.00 70 25 20.884 N 149 31 46.095 W -Polygon 5 4107.00 3475.70 -7411.16 6003327.00 558158.00 70 25 10.939 N 149 31 34.388 W -Polygon 6 4107.00 3585.03 -6878.13 6003441.00 558690.00 70 25 12.019 N 149 31 18.760 W MPS-34 NE T2 4112.00 4429.56 -7494.79 6004280.00 558066.00 70 25 20.319 N 149 31 36.868 W MPS-34 NE T3 4122.00 5084.94 -7072.98 6004939.00 558482.00 70 25 26.769 N 149 31 24.516 W MPS-34 NE T5 4132.00 6613.61 -5873.40 6006478.00 559668.00 70 2541.813 N 149 30 49.367 W Company: Field: Site: Well: Wellpatb: -...----...-........ Targets :-O;ume BP Amoco Milne Point MPtSPad Plan MPS-34 Plan MPS-34 NE Plan Section Information MD ft 10092.00 10112.00 10219.11 10394.24 10650.03 11003.47 11421.13 11441.48 11496.53 12212.46 12288.22 12351.73 13386.75 Survey MD L__ ft 10091.83 10092.00 10100.00 10112.00 10125.00 10140.20 10150.00 10175.00 10200.00 10219.11 10300.00 10394.24 10400.00 10450.00 10500.00 10550.00 10600.00 10650.03 10700.00 10750.00 10800.00 10850.00 10900.00 10950.00 11003.47 11100.00 11200.00 11300.00 11400.00 11421.13 11441.48 11496.53 11500.00 Incl deg 75.18 77.58 90.39 90.39 89.50 89.21 89.21 90.00 92.20 92.20 90.00 87.85 87.85 Inel deg 75.18 75.18 76.14 77.58 79.14 . 80.95 82.13 85.12 88.11 90.39 90.39 90.39 90.37 90.20 90.02 89.85 89.67 89.50 89.45 89.40 89.35 89.31 89.27 89.24 89.21 89.21 89.21 89.21 89.21 89.21 90.00 92.20 92.20 1)I!seriptiun Uip. I>ir. Adm deg 338.81 338.81 339.88 339.88 8.00 39.81 39.81 40.00 40.08 40.08 38.00 36.64 36.64 Azim deg 338.80 338.81 338.81 338.81 338.94 339.10 339.20 339.44 339.69 339.88 339.88 339.88 340.51 346.01 351.50 357.00 2.50 8.00 12.50 17.00 21.50 26.00 30.50 35.00 39.81 39.81 39.81 39.81 39.81 39.81 40.00 40.08 40.08 e TVU ft TVD ft ---..-.- ..--.-- 4097.04 4101.75 4112.95 4111.75 4112.00 4116.09 4121.86 4122.00 4120.94 4093.45 4092.00 4093.19 4132.00 TVD ft 4097.00 4097.04 4099.02 4101.75 4104.37 4107.00 4108.44 4111.22 4112.70 4112.95 4112.40 4111.75 4111.71 4111.47 4111.37 4111.43 4111.64 4112.00 4112.46 4112.96 4113.51 4114.09 4114.71 4115.36 4116.09 4117.42 4118.80 4120.19 4121.57 4121.86 4122.00 4120.94 4120.81 BP KW A Planning Report ; :-o;/-s ft +N/-S ft 3895.72 3913.84 4013.31 4177.74 4429.56 4748.52 5069.33 5084.94 5127.08 5674.43 5733.25 5783.74 6613.61 Sys TVD ft 4025.00 4025.04 4027.02 4029.75 4032.37 4035.00 4036.44 4039.22 4040.70 4040.95 4040.40 4039.75 4039.71 4039.47 4039.37 4039.43 4039.64 4040.00 4040.46 4040.96 4041.51 4042.09 4042.71 4043.36 4044.09 4045.42 4046.80 4048.19 4049.57 4049.86 4050.00 4048.94 4048.81 e -.....----...,--.-- Date: 7/23/2003... Time: 16:18:36 Page: 2 Co-OI'dinate(NE) Reference: Well: Plan MPS-34, True North Vertical (TVD) Reference: S-Pad Dev 72.0 Section (VS) Reference: User (3895.72N,-7363.29E.28.73Azi) Survey Calculation Method: Minimum Curvature·,.Db: Oracle ......................--.-....... +I(/-W ft +E/-W ft -7363.29 -7370.31 -7407.80 -7468.05 -7494.79 -7353.42 -7086.04 -7072.98 -7037.57 -6576.92 -6529.21 -6490.72 -5873.40 'hip 'urlhin~ n '111p Eustin~ ft ..---.-j <---- I.atitude ---> <-- I.un~itude --> I>c!: "lin See l>e2 "lin Sec DLS Build Turn TFO deg/100ft deg/100ft deg/100ft deg ._.._.__._.._....._ _n._ ~...~. . .___.__. _ Mh_.__.___.__.....___...__ 0.00 0.00 0.00 0.00 12.00 12.00 0.00 0.00 12.00 11.96 0.99 4.80 0.00 0.00 0.00 0.00 11.00 -0.35 10.99 91.79 9.00 -0.08 9.00 90.70 0.00 0.00 0.00 0.00 4.00 3.89 0.93 13.51 4.00 4.00 0.15 2.19 0.00 0.00 0.00 0.00 4.00 -2.90 -2.75 -136.54 4.00 -3.38 -2.13 -147.78 0.00 0.00 0.00 0.00 MapN ft 6003747.23 6003747.38 6003754.59 6003765.44 6003777.28 6003791.21 6003800.23 6003823.40 6003846.70 6003864.57 6003940.26 6004028.45 6004033.85 6004081.58 6004130.51 6004180.19 6004230.16 6004280.00 6004329.22 6004377.67 6004425.00 6004470.92 6004515.15 6004557.42 6004600.16 6004674.84 6004752.20 6004829.56 6004906.92 6004923.27 6004939.00 6004981.44 6004984.11 MapE VS ft ft _uo..___..·. 558202.24 -0.10 558202.17 0.00 558199.31 4.99 558194.99 12.52 558190.30 20.73 558184.82 558181.29 558172.31 558163.40 558156.63 558128.14 558094.95 558092.95 558078.13 558067.96 558062.52 558061.86 558066.00 558074.45 558086.75 558102.81 558122.54 558145.80 558172.47 558204.55 558265.69 558329.03 558392.36 558455.70 558469.08 558482.00 558517.03 558519.24 30.41 36.69 52.85 69.17 81.72 134.94 196.95 200.76 235.81 274.11 315.31 359.04 404.91 452.28 500.79 550.09 599.88 649.86 699.72 752.56 847.28 945.41 1043.54 1141.66 1162.40 1182.37 1236.33 1239.73 DLS deg/1000 0.00 4.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 0.00 0.00 11.00 11.00 11.00 11.00 11.00 11.00 9.00 9.00 4.00 4.00 0.00 Target. . MPS-34 NE T2 MPS-34 NE T3 MPS-34 NE T4 MPS-34 NE T5 TFO deg .--.--.----.---." 0.00 83.85 0.00 0.00 4.80 0.00 0.00 91.79 91.80 91.82 91.83 91.83 91.80 90.70 90.65 9.00 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0.00 90.61 90.56 90.51 90.45 90.39 0.00 0.00 0.00 0.00 0.00 Too SBE4-NC MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS 4.77 4.74 4.73 4.70 4.69 MPS-34 NE Po y MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MPS-34 NE T2 MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS 13.51 MPS-34 NE T3 2.19 MWD+IFR+MS 0.00 MWD+IFR+MS e BP e KW A Planning Report CompallY: BP Amoco Uatt': 7/23/2003 Time: 16:18:36 I'age: 3 Field: Milne Point Co-ol"dillatt'C' E) I{t'rel"ellce: Well: Plan MPS-34, True North Sile: M pt S Pad Vt'rtical (TV I» I{derellce: S-Pad Dev 72.0 \\'ell: Plan MPS-34 Section (VS) I{ert'renct': User (3895.72N,-7363.29E,28.73Azi) \\-ellpath: Plan MPS-34 NE Surve~' Calcuhllioll :\'It'thod: Minimum Curvature Ub: Oracle Survey \11) IlIeI ,\:r.irn TV\) S~s "1"\1) :\lllp:"i :\Iapl': VS )LS TFO Too! fI deg deg ft ft ft ft ft deg/100ft deg 11600.00 92.20 40.08 4116.97 4044.97 6005061.11 558582.90 1337.70 0.00 0.00 MWD+IFR+MS 11700.00 92.20 40.08 4113.13 4041.13 6005138.12 558646.56 1435.67 0.00 0.00 MWD+IFR+MS 11800.00 92.20 40.08 4109.29 4037.29 6005215.13 558710.23 1533.64 0.00 0.00 MWD+IFR+MS 11900.00 92.20 40.08 4105.45 4033.45 6005292.14 558773.89 1631.61 0.00 0.00 MWD+IFR+MS 12000.00 92.20 40.08 4101.61 4029.61 6005369.15 558837.56 1729.58 0.00 0.00 MWD+IFR+MS 12100.00 92.20 40.08 4097.77 4025.77 6005446.16 558901.22 1827.55 0.00 0.00 MWD+IFR+MS 12200.00 92.20 40.08 4093.93 4021.93 6005523.17 558964.88 1925.53 0.00 0.00 MWD+IFR+MS 12212.46 92.20 40.08 4093.45 4021 .45 6005532.76 558972.82 1937.74 0.00 0.00 MWD+IFR+MS 12288.22 90.00 38.00 4092.00 4020.00 6005592.00 559020.00 2012.25 4.00 223.46 MPS-34 NE T 4 12300.00 89.60 37.75 4092.04 4020.04 6005601.36 559027.15 2023.88 4.00 212.22 MWD+IFR+MS 12351.73 87.85 36.64 4093.19 4021.19 6005642.82 559058.04 2075.03 4.00 212.22 MWD+IFR+MS 12400.00 87.85 36.64 4095.00 4023.00 6005681.77 559086.49 2122.80 0.00 180.00 MWD+IFR+MS 12500.00 87.85 36.64 4098.75 4026.75 6005762.46 559145.42 2221.78 0.00 180.00 MWD+IFR+MS 12600.00 87.85 36.64 4102.50 4030.50 6005843.15 559204.35 2320.76 0.00 180.00 MWD+IFR+MS 12700.00 87.85 36.64 4106.25 4034.25 6005923.84 559263.29 2419.74 0.00 180.00 MWD+IFR+MS 12800.00 87.85 36.64 4110.00 4038.00 6006004.54 559322.22 2518.72 0.00 180.00 MWD+IFR+MS 12900.00 87.85 36.64 4113.75 4041.75 6006085.23 559381.15 2617.69 0.00 180.00 MWD+IFR+MS 13000.00 87.85 36.64 4117.50 4045.50 6006165.92 559440.08 2716.67 0.00 180.00 MWD+IFR+MS 13100.00 87.85 36.64 4121.25 4049.25 6006246.61 559499.01 2815.65 0.00 180.00 MWD+IFR+MS 13200.00 87.85 36.64 4125.00 4053.00 6006327.30 559557.94 2914.63 0.00 180.00 MWD+IFR+MS 13300.00 87.85 36.64 4128.75 4056.75 6006407.99 559616.87 3013.61 0.00 180.00 MWD+IFR+MS 13386.75 87.85 36.64 4132.00 4060.00 6006478.00 559668.00 3099.47 0.00 180.00 MPS-34 NE T5 BP EXPLORATION Casing Report - Planning Data for CONDUCTOR 1 Legal Well Name: MPS-34 Common Well Name: MPS-34 Event Name: ORIG DRILLING Report #: Start: End: 1 8/10/2003 General Information ...-. - -.- -.- _"..___.__. _n_ _'._ .__._..'_"___~"_ ...___. _....___ ..___ ___ _" __ _ Page 1 of 1 Spud Date: 8/11/2003 Report Date: 8/11/2003 Date Landed: 8/11/2003 .--' ---- .--' -.-' .-" .-. .____·..__·.w_·.·__··_..··_... "___ ._".__ ..._..._....___ __" ._.... __...._.... _._....._ .__ _.. "_""._._. _.... ._.... -.... ---.. ---"" ..-" ..-..... .--' .--....----.. ..--. .--...--....---...-....-..--...-.-.-....- String Type: CONDUCTOR 1 Hole TVD: 110.0 (ft) Ground Level: (ft) Circ Hours: (hr) Permanent Datum: KB-Datum: CF Elevation: Mud Lost: 0.00 (ft) 0.00 (ft) (bbl) Hole Size: Water TMD: Liner Overlap: KB to Cutoff: 13.500 (in) (ft) (ft) 34.68 (ft) Casing Flange 1 Wellhead _....._..._.._._ ..__ .'_ .._...__.._.,.._._.__n. _ .._....._.,..___...___.__....._.. .__" ____._.._._..._" .__. .__ .._. n__""...__ ....__.._,_...._ Hole TMD: Str Wt on Slips: Max Hole Angle: Days From Spud: 112.0 (ft) (lb) n 0.67 (days) e ._ n_ __".._'''_'_' .._..,_."__ .__ ._..___" ._" .__ ._, .___. _,' ._" ..__ ._ ..___.___ .-. .--- .---. ._- ---_. -..-.-. ,_. .-- -- -- .--...-- .--- -- .-,....-.. --...-"'--- .-. --. Manufacturer: FMC Hanger Model: Landing Ring Model: Packoff Model: Actual TMD Set: 110.00 (ft) _,._..._ ..._....._...._._. __...._. n_ _.._. _._..___._.__._.. .._. .._ ...-...._.._-'. ..._ ..._.....__...._ u_. ___ ___ .'_. ,.___ u_. ._.__ ._.__ Integral Casing Detail ----- -. -..---..-.-..--'-.".- ··-·--'-·---···--r--··--·--- _._.__.._.~..._-- ---..- ·-'1-- -- ---,..- .---.--,-:;.....:=1 Item I· Size !. Weight : Grade Drift \ Threads JTS: Length ; Top ¡THO , (in) 'I (Ib/ft) I (in) ; I (ft) I (ft) 'I I CASING JOINTS I 20.000 94.00 H-40 18.93618RST+C 21 75.321 34.68 1 ~ J )D' - .-.-. - .'-- Manufacturer Top Hub/Flange: (in) I (psi) BTM Hub/Flange: (in) I (psi) ..- -.. .'--- .--. .---. ..--...-.-. .--. ..-_..._--.. -1 ¿--;;-~d~-r Max OD[ ~ IDr . -- ¿o~p~~,;;-· I (in) I· (in) 19.124 e Printed: 8/18/2003 4:50:38 PM Legal Well Name: MPS-34 Common Well Name: MPS-34 Event Name: ORIG DRILLING .......----.-............ BP EXPLORATION Casing Report - Planning Data for SURFACE CASING ......--.. ......... ._.____m .._____._.___...... String Type: SURFACE CASING Hole TVD: 2,895.0 (ft) Ground Level: (ft) Circ Hours: 3.00 (hr) .........---..- .--...-.---..... ......----. -....---.-- Manufacturer: FMC Hanger Model: Actual TMD Set: 5,518.09 (ft) Permanent Datum: KB-Datum: CF Elevation: Mud Lost: .---. Model: Packoff Model: .........---., ........_--.-. ...--- ........--- ...---]- ......-.--. ....-.--. Size Weight Grade Drift (in) ; (Ib/ft) (in) Item CASING HANGER CASING JOINTS FLOAT COLLAR CASING JOINTS FLOAT SHOE 10.750 10.750 10.750 10.750 45.50 L-80 45.50 L-80 ...,.......-.--- Accessory CENTRALIZER ---..- 7 Straight blade centralizers ran on 1 st 7 joints 9.875 BTC BTC 9.875 BTC -----.- HALLIBURTON Report #: Start: End: 2 8/10/2003 ....n._._.__·"_ .--..-----... General Information ........ .-.----...- ...... ....-------...... ...---.-..-..... 0.00 (ft) 0.00 (ft) (bbl) Hole Size: Water TMD: Liner Overlap: KB to Cutoff: 13.500 (in) (ft) (ft) 34.30 (ft) ........-..--.--- Casing Flange 1 Wellhead .----- -.------. .......-.--.--. Integral Casing Detail Threads-: J'Ts-~~~~ïh'l ~~f" ¡THO Manufacturer 2.65 34.30 FMC 131 5,397.93 36.95 LONESTAR 1 1.22 5,434.88 HALLIBURTON 2 80.24 5,436.10 LON ESTAR 1 1.75 5,516.34 HALLIBURTON .__n__ '---..J n. " ¡:-, . ¡-- Non-Integral Casing Accessories.:) J / Ó --........-.---.-- Manufacturer Number ..-..----. ...-..-----.---- -.....-..---.-... Remarks ........____. ....·...·m____..._.......·____ Page 1 of 1 Spud Date: 8/11/2003 Report Date: 8/12/2003 Date Landed: 8/14/2003 ..,.-------.. Hole TMD: Str Wt on Slips: Max Hole Angle: Days From Spud: ...........---.- 5,526.0 (ft) (Ib) 76.00 n 1.67 (days) e Top Hub/Flange: 12.000 (in) I (psi) BTM Hub/Flange: (in) I (psi) Condo Max 00 Min ID (in) (in) Compo Name 9.950 9.950 e ..... ...-.-.-.--.- --.-....-..---.--.---.--... i Interval 7 ¡--ToP (ft) 5,218.~ !__·--··~~tí~~-(ftf,:-9~~- Printed: 8/18/2003 4:50:27 PM - . BP EXPLORATION Cementing Report Page 1 of 3 Legal Well Name: MPS-34 Common Well Name: MPS-34 Event Name: ORIG DRILLING Report #: Start: 1 8/10/2003 Spud Date: 8/11/2003 Report Date: 8/11/2003 End: Cement Job Type: Primary _.._..._..._¥_...___n.____.__...__..._..,._____..__..__···----··-···-··-····---1-··-···~-_····_····-···-··_··.-----...--r.....-...---..-.-...--..-.....--.-..--...-..,.- _ _ ___Fdl1}?rl.. __ ______~u~eze Qpe...!!Hol~____ ___~lIeeze~a~n!L__~___ ___E!lIL______ Hole Size: 13.500 (in) Hole Size: Hole Size: Hole Size: TMD Set: 5,518.0 (ft) SO TMD: (ft) TMD Set: Top Set: (ft) Date Set: 8/14/2003 SO Date: Date Set: BTM set: (ft) Csg Type: SURFACE CASING SO Type: Csg Type: Plug Date: Csg Size: 10.750 (in) SO TMD: Plug Type: SO Date: Drilled Out: Cmtd. Csg: OPEN HOLE Cmtd. Csg: Cmtd. Csg: Cmtd. Csg: Cement Co: HALLIBURTON _, _.._"_'"._' _, ._. - - ._ _. .__, _.._. _.._n._ ._" _"._ __.._ _ _ __"._" _ _ _ Pipe Movement __..___..._..___"_. _.."_ ..._._...._._..._.._...__.._..._.__.._..._...___...._...._....._....__ _..._.."_..,__.._.._ ..___.___.___,0._.._..__..._...__...__..._.._ Rot Time Start: : Rec Time Start:OO:OO Time End: : Time End: 00:00 RPM: SPM: Init Torque: (ft-Ibf) Stroke Length: (ft) Avg Torque: (ft-Ibf) Drag Up: (lb) Max Torque: (ft-Ibf) Drag Down: (lb) Stage No: 1 of 1 '. --- .-- -.-.-.--.-- -.-.---.--.-.--..--..-..-.-- - ---.-. - - .-.--.- ---.. - _..~- ---.-".-.-. Type: PRIMARY CEMENT Start Mix Cmt: 20:30 Disp Avg Rate: 5.00 (bbl/min) Return~ost retuJPS: Volume Excess %: 250.00 Start Slurry Displ: 20:30 Disp Max Rate: 6.00 (bbl/min) Total Mud Lost: 232.00 (bbl) J Meas. From: EST. GAUGE HOLE Start Displ: 22:42 Bump Plug: Y Cmt Vol to Surf: (bbl) Time Circ Prior End Pumping: 01 :00 Press Prior: (ft) To Cementing: 3.50 End Pump Date: 8/15/2003 Press Bumped: 2,500 (psi) Mud Circ Rate: 400 (gpm) Top Plug: Y Press Held: 5 (min) Mud Circ Press: 420 (psi) Bottom Plug: Y Float Held: Y Ann Flow After: N Mixing Method: ON-THE-FL Y Density Meas By: DENSOMETER -'-"-"-"-"---"'---".-...-.-..- '-.--'-'.'- ._--.~_.._.- ..-...- ._._~.__.._..._._- -.-..- Mud Data -...-..-.....-. -.-- -'.-.'-...- -.-.----..- _-'_._"_"_._.._.._._._._.__..'_.__ _...__'_"'_"_"_ _··._···_._··_··____···_._·.__._.·_M_._.. Type: SPUD MUD Density: 9.30 (ppg) Vise: 47 (s/qt) Bottom Hole Circulating Temperature:55 ("F) Displacement Fluid Type:OLD MUD PVIYP: 19 (cp)/8 (lb/100ft2) Gels 10 sec: 3 (lb/100ft2) Gels 10 min: 8 (lb/100ft2) Bottom Hole Static Temperature: 60 (OF) Density: 9.30 (ppg) Volume: 284.00 (bbl) Stage No: 1 Slurry No: 1 of 4 ..---..-..-.-..-..-...--...-.-..-..-...-.....-..--...-.-.-....-...--.--..-.. -.--....-...-. --...-..-.....-.--..-...-....- ...-....-.....-..-..-...-....-....--.-...-..- Slurry Data Fluid Type: PRE FLUSH Slurry Interval: (ft) To: (ft) Water Source: LAKE Description: SPACER WATER Cmt Vol: (sk) Density: 8.30 (ppg) Slurry Vo120.0 (bbl) Water Vol: 20.00 (bbl) Class: SPACER Yield: (ft3/sk) Other Vol: (bbl) Purpose: SPACER Mix Water: 100.00 () Foam Job: N Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: (OF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Pressure (psi) (psi) Printed: 8/18/2003 4:51:05 PM - -- BP EXPLORATION Cementing Report Legal Well Name: MPS-34 Common Well Name: MPS-34 Event Name: ORIG DRILLING Report #: Start: 1 8/10/2003 Stage No: 1 Slurry No: 2 of 4 Page 2 of 3 Spud Date: 8/11/2003 Report Date: 8/11/2003 End: _..._...__..._._.._..._._.._.__..._...._.._._._._.._.._.._...__."__"._. _.,_..__ ,_, ._..,_.._,._..._...__....._..__. ___..._..._m_..__'" _.._...._.._.. _ __" ._.... __,_ Slurry Data Fluid Type: SPACER Slurry Interval: (ft) To: (ft) Water Source: LAKE Test Data Thickening Time: Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Description: SPACER WEIGHTED Class: SPACER Cmt Vol: (sk) Density: 10.20 (ppg) Yield: (ft3/sk) Slurry Vol:75.0 (bbl) Water Vol: 45.00 (bbl) Other Vol: (bbl) Temperature: (OF) Temperature: (OF) Temperature: CF) Time Compressive Strength 1: Compressive Strength 2: ~-, -.-,.-...--.-..-....--..-,...-...-,..-..---,..-...-..-.'-"..- .-,.-".-....-.-..- Stage No: 1 Slurry No: 3 of 4 Temp CF) (OF) Purpose: SPACER Mix Water: 0 Foam Job: N Pressure (psi) (psi) ._"._ ._..._ ._. __._.._ ._" _...___"._.__.._n ___. _"_." _._ __" __" _" _" ._ __._",_,,_ _ ._" __., _ _" .__._ .___ _ _. _'.._ Slurry Data Fluid Type: CEMENT Slurry Interval: 134.0 (ft) Water Source: LAKE Description: LEAD SLURRY Class: OTHER To: 4,741.0(ft) CmtVol: 935(sk) Density: 10.70 (ppg) Yield: 4.150 (ft"/sk) Slurry Vol:691.0 (bbl) Water Vol: 452.00 (bbl) Other Vol: (bbl) Test Data Thickening Time: 6.00 Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Temperature: (OF) Temperature: (OF) Temperature: (OF) Time Compressive Strength 1: Compressive Strength 2: Temp (OF) (OF) Purpose: FILLER SLUR Mix Water: 20.30 0 Foam Job: N Pressure (psi) (psi) "._" _._...__._.__.._. ._"._"__"__'_" _··____n._·_.'·_ __..,"_"_"__ _"._"._" .__...__.__.._..._...__.._..__._..._...._...._..._ Slurry Data Fluid Type: CEMENT Slurry Interval: 4,741.0 (ft) To: Water Source: LAKE Test Data Thickening Time: 3.40 Free Water: (%) Fluid Loss: (cc) Fluid Loss Pressure: (OF) Stage No: 1 Slurry No: 4 of 4 Description: TAIL SLURRY Class: G-CLASS 5,518.0 (ft) Cmt Vol: 375 (sk) Density: 15.80 (ppg) Yield: 1.150 (ft3/sk) Slurry Vol:76.0 (bbl) Water Vol: 47.00 (bbl) Other Vol: (bbl) Temperature: 70 (OF) Temperature: (OF) Temperature: CF) Time Compressive Strength 1: 12.00 Compressive Strength 2: 24.00 Temp 70 (OF) 70 CF) Purpose: FILLER SLUR Mix Water: 5.00 0 Foam Job: N Pressure 828 (psi) 1,359 (psi) -.-'-'.-..--- --..----".- - -. .__._~-- -.-.'-"'- -".-" -'-.-".--.--.-- ---".--,._--_.~ Stage No: 1 Slurry No: 4 of 4 - Additives ;-A=-;-=--=-' Tæ-~·!-!a;~-==~==--~~EL=T~~-+ ~o!!fentæ.tj~.~ % ~ ·~i~._ -(-- Li9UidCon~:..___~._..Q[1its_=.~ Printed: 8/18/2003 4:51 :05 PM e e BP EXPLORATION Cementing Report Page 3 of 3 Legal Well Name: MPS-34 Common Well Name: MPS-34 Event Name: ORIG DRILLING Report #: Start: 1 8/10/2003 Spud Date: 8/11/2003 Report Date: 8/11/2003 End: Casing Test Shoe Test Liner Top Test .. 'n__ ..... .__......_. ". _.___._..._...... .--.--.... Test Press: 2,500 (psi) For: 30 (min) Cement Found between Shoe and Collar: Y Pressure: (ppge) Tool: N Open Hole: (ft) Hrs Before Test: Liner Lap: Pos Test: (ppge) Neg Test: (ppge) Hrs Before Test: Cement Found on Tool: N Tool: N Tool: N .....___.__ n...______.."._ ..._..____...... log/Survey Evaluation Interpretation Summary ...--...... -.------. ---.----.. ........-,..-.---- CBL Run: N Under Pressure: (psi) Bond Quality: Cet Run: N Bond Quality: Temp Survey: N Hrs Prior to Log: Cement Top: (ft) How Determined: TOC Sufficient: N I Job Rating: If Unsuccessful Detection Indicator: Remedial Cementing Required: N Number of Remedial Squeezes: Remarks "_______..n ---".-.. ..---.... ------...... .......--- ..._--~ PRIMARY CEMENT JOB LOST RETURNS AFTER DISPLACING 290 BBLS OUT OF TOTAL DISPLACEMENT OF 522 BBLS. BUMPED PLUG WITH 1000 PSI OVER DISPLACEMENT PRESSURE OF 1500 PSI FOR TOTAL PRESSURE OF 2500 PSI. BLED OFF PRESSURE CHECKED FLOATS - FLOATS HELD. PUMPING RATE FOR SPACER 7 BBLS PER MIN AT 425 PSI- LEAD CEMENT 7 BBLS PER MIN AT 300 PSI- TAIL CEMENT 5 BBLS PER MIN AT 700 PSI - DISPLACEMENT 5 BBLS PER MIN AT 1100 TO 1500 PSI SLOWED DOWN TO 3 BBLS PER MIN LAST 25 BBLS AT 1500 PSI TO BUMP PLUG. NO CEMENT TO SURFACE. PREFORMED TOP JOB - RAN IN 1" CS HYDRILL TUBING TAG UP HARD AT 134' RKB - PUMP 50 BBLS FRESH WATER TO FLUSH CONDUCTOR - FOLLOWED BY 54 SX TYPE "L" YIELn 4.15 CFISX 2~CF 40 BBLS OF SLURRY MIXED AT 10.5 PPG -10 BBLS OF 10.5 PPG CEMENT TO SURFACf: - LI::F I IN HOLE 30 BBLS OF SLURRY - 40 SXS Printed: 8/18/2003 4:51:05 PM e e Per Alaska Oil and Gas Conservation Commission Regulation 20 AA 25.005 Permit to Drill sub section 14 (e) if a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface or production casing, the applicant shall designate one branch as the primary Well bore and include all information required under (c) of this section that is unique to that branch and need not include the $100 fee. -- . TRANSMJT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME /IJ¡?>t< ,-<)..;3Lj L 2- 20 3 - /Vt/ PTD# CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL / (If API number last two (2) digits are between 60-69) "CLUE" The permit is for a new W. ell_bpre segment of existing well.!!J.ßl, 5-.3 7' I Permit No,.2Þ3-/~I No. {;'l>.o 2... ~-2..3( 7 -00 Production should continue to be reported as a function' of the original API number stated above. HOLE In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (SO 70/80) from records, data and logs acquired for well (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/10/02 C\jody\templates The permit is approved subject to full compliance with 20 AAC 25.055. Approval to peñorate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing . exception that may occur. An dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. -- . ~ o Well bore seg Annular Disposal 1J~¡J'''_i~~Field & Pool MILNE POINT, SCHRADER BLFF OIL - 525140 Well Name: MILNE PT UNIT SB S-34L2 Program DEV PTD#: 2031440 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV I PEND GeoArea 890 Unit 11328 OnlOff Shore On Administration 1 Permit fee attached. - - - - - - - ~ - ~ - - - - - - - - - - - ~ · NA. · . Lateral w~lJb.ore; .fee wajv~d per.20 .AAC25.005(e} - - - - - - 2 .Leas.enumber .appropriate. - - - - - - - - - - - - - - - - - - - - - - · Y~s. - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - 3 Unique wellnam~and Ol!mb.er . . - - - - - - - - - · Y~s. - - - - - - - - - - - - 4 WeJI JQcat~d ina defined pool. - - - - -- .........Y.es. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5 Well JQcat~d proper .distance. from driJling unit.b.ound.ary. ........ Y~s. - - - - - - - - - - - - - - - - 6 WellJQcat~d proper distançe. from. QtheJ wells - - - - - - -- · y~s - - - - - - - - - - - - - - - - - 7 Sufficient .acn'!ageayailable In.dJilJiog unit . . . . . . . . ........ Y~s. - - - - - - - - - - - - - - - - - - - - - - - - - - 8 Jfd~viated, js. weJI bQre plaUncjuded · y~s - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - 9 Qperator onl}' affected party. . - - - - -- · y~s.. - - - - - - - - - - - - - - - - - - - 10 .Qperator has appropriate. bond in.force. . . - - - - - - - - · Y~s. - - - - - - - - - - - - - - - - 11 P~rmit can be issued wHI)Qu! ÇQ.nserva.tion order. . · y~s - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 12 P~rmit can be issued withQut ad.ministratille.approvaJ . Y~s. - - - - - - - - - - - - - - - - - - - - SFD 8/19/2003 13 Can permit be apPJov~d before .15-day. wajl. . . . . . . . · y~s. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 WellJocat~d within area and strata .authorized by.iojeçtioo Ord~r # (putiO# in.comm~ots)(For NA . . - - - - - - - - - - - - - 15 AJI wells witt1in.1 [4 milear~a.of (eyiew id~otified (For ~ervic~ weU on I}') . · NA - - - - .. - .. - ~ - - - - - 16 Pre-produced injeçtor; duraüonof pre-produc;tion I~ss than. 3 months. (For service well. Qnly) . . NA - - - - - .. - - - - - - - - .. - - - .. - 17 ACMP finding.of Con$i$tençy.h.as been i~sued for. this pr.oiect NA · . Lateral.w~lJb.ore dJilledJrom. e.xisting.pad. - - - .. .. .. .. Engineering 18 C.ooduçtor string.PJQÝidßd . - - .. .. - - - -.. - - - - · NA.. · Conduçtor jn.staJled. iO MPS,3~. . . . . . . .. - - .. - 19 Surfaceca~ing.PJotec;ts alLknown. USQWs . - - - - - .. - - · NA · .';11. aquif~rs ex~mpt~d ~O CFB j4 7..1.02(b )(3) 20 CMT voL adeQu.ate.to circ.uLate.on .cond.uctor & SUJf.CSg . . . - - - - - - - · NA · . Surface ça$ing installed in MPS-34 . . 21 .CMT vol adeQuate.to tie-inJQng .string to.sur:f çsg. . . . . . . . . . · NA. · Prodl!ctioncasiog installed in MeS-34 . .. - .. - 22 CMTwill çoyer.aJl kOQwnpro.duçtiye hQri;1:ons. - - - - - .. - - .. .. - - · No · . Slot!edJioer .completion plaoned.. 23 Casiog de.signs adeQua.te for C,.T" B .&permafrosl. . . . - - - - - - ...... Yes. - - - .. - .. .. - 24 .Ädequate.tankage.oJ re.serye pit. . . . . . . - - - - - .. - - - · y~s . . . Big ise~uippe.dwittl ~tßelpits.No.reseJ\lepjtpla[1!)ed, All wa~te to.c.las~ II w~lJ(s) 25 Jfare-drilt tlas.a 10-403 fQr abandonment be~o apPJQvßd . - - - - .. - - · NA - - - .. - - - - - - - - - .. - - - - - - - .. - - 26 Adequate wellbor~ ~eparation propo~ed. . . . . - - - - - - .. .. .. - · y~s · Proximit}' analysis perfo(med, No .close app(oach issues identified. with.this latera].. 27 Jf.diverter Jequired, dQe~ itmeetreguJa.tions. . · NA.. - - - - - - - - - - .. - - - .. - - .. - - - - - - - - .. - - - - - - - Appr Date 28 DriUiog fluid pJogram sc;hematic& equip Jisl.adequat~. . . . . . . · Y~s · . Expeçted SHe 8.35 EMW, PJanoed.mud wejghts9,Q -9..2 ppgwith 9..1 expected. TEM 8/19/2003 29 BOPEs, dO Jhey meßtreguJation . . . - - - - - .. .. - . . . .Y~s. - - -- - - - .. - - - - - - - - - - - .. .. - ~ll' 30 BOPEwess ratiog appropriate; .test to (puJ psig in .comments). . . - - - .. .. .. - · Y~s. CalçuJatedMASP. 15~5 psi. Plann.ed ßOP .test 3500 psi, - - - - .. .. .. .. - - 31 .Chokemanifold compJie~ w/APIRF'-53 (May 84). . . . . . . . . - .. .. - - - - · Y~s. - - - - - - - - - .. - - - - - - - - - - - - .. .. - - .. .. - 32 WQrJç will oÇCur withoul.operationsbutdown. . . . . - - .. .. - - · Y~s. - - - - - - - - - - - - - - - .. - 33 J~ pre~ençe Qf H2S gas. prQb.able. . . . . . . . . . . - - .. - - .. · NA - - - - - - - - - - - .. .. .. - - - 34 MechanicaLcoodjtion of w~lIs within ';OB yerified (for.s.ervicß w~1I on!}'). NA - - - - - .. - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - - Geology 35 P~rmitca[1 be tssued w/o hydrogen.s.ulfide measures. . . . . . . . . . . . . . . . . . . . . . . . . .Y~s . - - - - - - - - - - - - - - - - - - - - - - - - ~ 36 D.ata.pJeseoted on. p,ote.ntial ove.rpres.surß .ZOnes. . . . . . .Y~s. . . . Expeçted reservoir pre$SUJe i~8,35 ppg EMW; will be drHlßd with 9.0 ~ 9.2 ppg.mud, Appr Date 37 S.etsmic.analysjs Qf shaJlow gaszooes. . . . . . . . . . . . . . . · NA - - - - ~ - - - - - - - - . . . SFD 8/19/2003 138 S~abedCQnditioo survey (if off-shore} . . . . . . . . . . . .. NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 39 CQntact name[p]1one.forweßlsly progress.rep,orts [exploratory .ooly] . . . . . . . . . . . NA - - - - - - - - Geologic Date: Engineering Public Multilateral oil-producer in Schrader Bluff NE sand - SFD Commissioner Commissioner: Date Commissioner,--..., . Date ¡? ~ ~j~~ ~ J:J e e Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Pennitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding infonnation, information of this nature is accumulated at the end of the file under APPEN.DIX. No special effort has been made to chronologically organize this category of infonnation. Sperry-Sun Dr~ng Services LIS sca~ility . (~3-144 1 J.) eM '" .. $Revision: 3 $ LisLib $Revision: 4 $ Mon Oct 13 15:21:34 2003 Reel Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/10/13 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/10/13 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name. . . . . . . . . . . . . . . .UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-34 L2 500292317161 B.P. Exploration (Alaska) Inc. Sperry-Sun Drilling Services 13 -OCT- 03 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002600988 T. MCGUIRE E. VAUGHN MWD RUN 2 MW0002600988 R. FRENCH C. DIXON MWD RUN 3 MW0002600988 R. FRENCH L. BROWN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 MW0002600988 T MCGUIRE C. DIXON MWD RUN 7 MW0002600988 T. MCGUIRE E. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 12 12N 10E 3252 412 MSL 0) 72.30 38.00 # WELL CASING RECORD OPEN HOLE CASING DRILLERS , . ... .... .. ... C -~~Z,,:~~~·~ n \~ 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT S.(IN) 13 .500 9.875 6.125 SIZE (IN) 20.000 10.750 7.625 DEPTH (FT) 112.0 5518.0 10159.0 . # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) , UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUNS 2 & 3 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). 5. THE PURPOSE OF MWD RUN 6 WAS TO POSITION THE WHIPSTOCK AND MILL THE WINDOW. THE TOP OF THE WINDOW WAS AT 10159'MD/4114'TVD, AND THE BOTTOM AT 10171'MD/4117'TVD. NEW FORMATION WAS DRILLED TO 10184'MD/4119'TVD. SROP DATA ONLY ARE PRESENTED FOR THIS RUN. 6. MWD RUN 7 COMPRISED DIRECTIONAL WITH DGR AND EWR4. 7. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 9/5/2003. MWD DATA ARE CONSIDERED PDC. 8. MWD RUNS I, 2, 3, 6, 7 REPRESENT WELL MPS-34 L2 WITH API#: 50-029- 23171-61. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13454'MD/4130'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP RESISTIVITY) . SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS $ File Header Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM RPS RPX $ 1 . . and clipped curves; all bit runs merged. .5000 START DEPTH 69.5 113.5 5505.5 5505.5 5505.5 5505.5 5505.5 STOP DEPTH 13399.0 13454.0 13406.0 13406.0 13406.0 13406.0 13406.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 3 6 7 MERGED MAIN PASS. $ MERGE TOP 69.5 5526.0 8846.0 10159.5 10184.0 MERGE BASE 5526.0 8846.0 10159.0 10184.0 13454.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type... ..0 Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69.5 13454 6761.75 26770 69.5 13454 ROP MWD FT/H 0.7 5544.73 293.048 26682 113.5 13454 GR MWD API 9.01 126.39 68.3469 26660 69.5 13399 RPX MWD OHMM 0.18 945.4 11.4807 15802 5505.5 13406 RPS MWD OHMM 0.25 999.8 11.6409 15802 5505.5 13406 RPM MWD OHMM 0.17 2000 12.819 15802 5505.5 13406 RPD MWD OHMM 0.2 2000 15.0433 15802 5505.5 13406 FET MWD HOUR 0.05 219.74 0.768139 15802 5505.5 13406 . . First Reading For Entire File......... .69.5 Last Reading For Entire File.......... .13454 File Trailer Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type.. . . . . . . . . . . . . . .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type.......... . . . . . .LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 69.5 113.5 STOP DEPTH 5481.0 5526.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 13 -AUG- 03 Insite 66.37 Memory 5526.0 112.0 5526.0 .0 77.2 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY TOOL NUMBER 155790 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 13.500 112.0 # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): Spud Mud 9.10 MUD VISCOSITY (S): 4IÞ MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 198.0 9.0 450 14.0 4IÞ .000 .000 .000 .000 .0 78.8 .0 .0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT FT/H API Size 4 4 4 Nsam 1 1 1 Code Offset o 4 8 Channel 1 2 3 Name DEPT ROP GR MWD010 MWD010 Rep 68 68 68 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 69.5 5526 2797.75 10914 69.5 5526 ROP MWD010 FT/H 3.9 5544.73 276.28 10826 113.5 5526 GR MWD010 API 9.01 112.18 60.8705 10824 69.5 5481 First Reading For Entire File......... .69.5 Last Reading For Entire File.......... .5526 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... ~10/13 Maximum Physical Record. ~35 File Type............... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 3 . header data for each bit run in separate files. 2 .5000 START DEPTH 5481.5 5505.5 5505.5 5505.5 5505.5 5505.5 5526.5 STOP DEPTH 8808.5 8801.0 8801.0 8801.0 8801.0 8801.0 8846.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 16-AUG-03 Insite 66.37 Memory 8846.0 5526.0 8846.0 71.9 77.0 TOOL NUMBER 126027 151812 9.875 5518.0 LSND 9.40 57.0 8.8 300 5.8 3.200 2.410 5.250 4.500 67.0 91.3 67.0 67.0 REMARKS: . . # $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5481. 5 8846 7163.75 6730 5481. 5 8846 ROP MWD020 FT/H 0.7 1452.54 417.726 6640 5526.5 8846 GR MWD020 API 15.84 126.39 74.5854 6655 5481.5 8808.5 RPX MWD020 OHMM 1. 72 57.84 9.16637 6592 5505.5 8801 RPS MWD020 OHMM 0.25 54.19 9.08132 6592 5505.5 8801 RPM MWD020 OHMM 0.17 2000 10.6593 6592 5505.5 8801 RPD MWD020 OHMM 0.2 2000 13.0508 6592 5505.5 8801 FET MWD020 HOUR 0.05 56.07 0.707524 6592 5505.5 8801 First Reading For Entire File......... .5481.5 Last Reading For Entire File.......... .8846 File Trailer Service name......... ... .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type........... . . . . .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ . 4 . header data for each bit run in separate files. 3 .5000 START DEPTH 8801.5 8801.5 8801.5 8801.5 8801.5 8809.0 8846.5 STOP DEPTH 10159.0 10159.0 10159.0 10159.0 10159.0 10159.0 10159.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O 18-AUG-03 Insite 66.37 Memory 10159.0 8846.0 10159.0 71.8 80.1 TOOL NUMBER 126027 151812 9.875 5518.0 LSND 9.55 61. 0 8.2 300 5.0 2.500 1.650 4.100 3.500 65.0 102.3 65.0 65.0 ·' Logging Direction. . . . . . .. . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............ ..Undefined Frame Spacing................... ..60 .1IN Max frames per record........... ..Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 8801.5 10159 9480.25 2716 8801.5 10159 ROP MWD030 FT/H 3.99 1111.6 272.059 2626 8846.5 10159 GR MWD030 API 19.2 114 . 84 65.5112 2701 8809 10159 RPX MWD030 OHMM 2.35 755.04 18.3334 2716 8801.5 10159 RPS MWD030 OHMM 2.35 248.53 15.6118 2716 8801.5 10159 RPM MWD030 OHMM 2.34 1816.22 17 . 766 2716 8801.5 10159 RPD MWD030 OHMM 2.41 2000 21.1047 2716 8801.5 10159 FET MWD030 HOUR 0.07 14.64 0.923582 2716 8801.5 10159 First Reading For Entire File......... .8801.5 Last Reading For Entire File.......... .10159 File Trailer Service name............ .STSLIB.004 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY 5 header data for each bit run in separate files. 6 .5000 . . VENDOR TOOL CODE ROP $ START eH 10159.5 STOP DEPTH 10184.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction............... ..Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing................... ..60 .1IN Max frames per record........... ..Undefined Absent value.................... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD060 . 26-AUG-03 Insite 66.37 Memory 10184.0 10159.0 10184.0 76.7 77.8 TOOL NUMBER 6.750 10159.0 Flopro 9.50 52.0 9.0 51000 3.6 .000 .000 .000 .000 .0 84.2 .0 .0 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 . , . .st Last Name Service Unit Min Max Mean Nsam ading Reading DEPT FT 10159.5 10184 10171. 8 50 10159.5 10184 ROP MWD060 FT/H 3.11 268.78 37.3842 50 10159.5 10184 First Reading For Entire File......... .10159.5 Last Reading For Entire File.......... .10184 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type.............. . .LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type............... .LO Previous File Name..... ..STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR FET ROP $ 6 header data for each bit run in separate files. 7 .5000 START DEPTH 10159.5 10159.5 10159.5 10159.5 10159.5 10159.5 10184.5 STOP DEPTH 13406.0 13406.0 13406.0 13406.0 13399.0 13406.0 13454.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 28-AUG-03 Insite 66.37 Memory 13454.0 10184.0 13454.0 77.7 93.7 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY TOOL NUMBER 160796 . , EWR4 $ Ele~mag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 148574 . 6.125 10159.0 FloPro 9.50 55.0 9.0 49000 4.2 .120 .080 .100 .160 65.0 99.7 65.0 65.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 RPX MWD070 OHMM 4 1 68 12 4 RPS MWD070 OHMM 4 1 68 16 5 RPM MWD070 OHMM 4 1 68 20 6 RPD MWD070 OHMM 4 1 68 24 7 FET MWD070 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10159.5 13454 11806.8 6590 10159.5 13454 ROP MWD070 FT/H 10.09 487.94 204.603 6540 10184.5 13454 GR MWD070 API 36.17 108.83 75.6103 6480 10159.5 13399 RPX MWD070 OHMM 0.18 945.4 10.9639 6494 10159.5 13406 RPS MWD070 OHMM 0.32 999.8 12.5784 6494 10159.5 13406 RPM MWD070 OHMM 0.32 944.58 12.9424 6494 10159.5 13406 RPD MWD070 OHMM 1.17 2000 14.5308 6494 10159.5 13406 FET MWD070 HOUR 0.18 219.74 0.764658 6494 10159.5 13406 First Reading For Entire File......... .10159.5 .. Last Reading For Entire Fil~....... .13454 . File Trailer Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/10/13 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.007 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/10/13 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/10/13 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name...... .... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File