Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-144
Image _ject Well History File c!er Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
d.o-3 - t Lb-l4- Well History File Identifier
Organizing (done)
o Two-sided 1111111111111111111
o Rescan Needed 1111111111111111111
RESCAN
D~TAL DATA
\)1 Diskettes, NO.;L.
o Other, No/Type:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Color Items:
o Greyscale Items:
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
BY:
~
r
Date ~~ ¡ aJ Db
o Other::
Scanning Preparation
BY: ~
~
!
Date: Jd.- (3 OS-
X 30 ~ ~D +
Date t:>- 13/ OS
/5/ vvt P
11111111111111 "III
/5/ vY1 tP
~ = TOTAL PAGES G d--
(Count does not i~~~ude cover ShVß1, f
11111111111111" III
Project Proofing
BY: ~
Production Scanning
Stage 1
Page Count from Scanned File: It, 3 (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: V YES
~ Dateld-/rÓ/O"b
If NO in stage 1, page(s) discrepancies were found: YES
NO
/5/ VVl\p
NO
Stage 1
BY:
BY:
Maria
Date:
/5/
1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
11111111111111" III
BY:
Maria
Date:
/5/
Comments about this file:
Quality Checked
III 11111111I111111I
1 0/6/2005 Well History File Cover Page. doc
•
MICROFILMED
03/01/2008
DO NOT PLACE
_.,.~_ ..
,t"~~
_,_
tom,.. ~~,...
~....
ANY NEW MATERIAL
UNDER THIS PAGE
F:~L,aserFiche\CvrPgs_InsertslMicrofilm_Marker.doc
J ·tJ '&;
DATA SUBMITTAL COMPLIANCE REPORT
12/5/2005
Permit to Drill 2031440
Well Name/No. MILNE PT UNIT SB S-34L2
Operator BP EXPLORATION (ALASKA) INC
API)J! ~~29~:71~O~ ~-
MD
13454 /'
REQUIRED INFORMATION
Mud Log No
Samples No
"f)Å).. ,....-
TVD ~".. Completion Date 9/1/2003
Completion Status 1-01L
DATA INFORMATION
Types Electric or Other Logs Run: GYRO, MWD, GR, PWD, ABI/IFR/CANSANDRA, RES
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
"f JiLð .RI"
~~ ~
"t
'-i'(pt
I
I
Log Log Run
Scale Media No
12191 LIS Verification
12191 Rate of Penetration
12191 Induction/Resistivity
Directional Survey
Directional Survey
1-7
1-7
1-7
Well Cores/Samples Information:
Name
Interval
Start Stop
Received
Sent
ADDITIONAL INFORMATION
Well Cored? ~ Y ~
Chips Received? ~
Analysis ~
Received?
Comments:
Daily History Received?
Formation Tops
;J.o
Compliance Reviewed By:
Current Status 1-01L
UIC N
D;'ect~",1 ~
(data taken from Logs Portion of Master Well Data Maint
Interval OHI .
Start Stop CH Received Comments
69 13399 Open 10/27/2003
69 13399 Open 10/27/2003 ROP, GR, EWR4
69 13399 Open 10/27/2003 ROP, GR, EWR4
10153 13454 9/24/2003
10153 13454 9/24/2003 MWD
Sample
Set
Number Comments
G;tN'
riÞN
.
Date:
s ~~~-
· STATEOFALASKA .
ALASKA ~ AND GAS CONSERVATION COMM .oN
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20MC 25.105 20MC 25.110
21. Logs Run:
GYRO, MWD , GR , PWD , ABI / IFR / CASANDRA , RES
CASING, liNER AND CEMENTING RECORD
SEtTING DEPTH
Top BOTTOM
35' 110'
34' 5518'
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3252' NSL, 412' WEL, SEC. 12, T12N, R10E, UM
Top of Productive Horizon:
1920' NSL, 2530' WEL, SEC. 02, T12N, R10E, UM
Total Depth:
4662' NSL, 926' WEL, SEC. 02, T12N, R10E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 565599 y- 5999917 Zone- ASP4
TPI: x- 558166 y- 6003804 Zone- ASP4
Total Depth: x- 559746 y- 6006558 Zone- ASP4
18. Directional Survey 181 Yes 0 No
22.
CASING
SIZE
WT.
94#
45.5#
GRADE
H-40
L-80
20"
10-3/4"
7-5/8"
4-1/2"
29.7#
12.6#
L-80
L-80
32'
10137'
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
4-1/2" Slotted Liner
MD TVD MD TVD
10224' -13047' 4125' - 4147'
260 sx Arctic Set (Approx.)
935 sx PF 'L', 371 sx Class 'G'
Top Job ( 54 SX PF 'L')
725 sx Class 'G'
Uncemented Slotted Liner
One Other
5. Date Comp., Susp., or Aband.
9/1/2003
6. Date Spudded
8/26/2003
7. Date T.D. Reached
08/28/2003
8. Elevation in feet (indicate KB, OF, etc.)
KBE = 72.30'
9. Plug Back Depth (MD+ TVD) (\ ¡\k)
13454 +.4322' LII J Ft
10. Total Depth (MD+TVD) H JjO
13454 + 4ð2l ~ Ft
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/ A MSL
Revised 10/30/03, Start Production
1b. Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit Number
203-144
13. API Number
50-029-23171-61-00
14. Well Number
MPS-34L2
15. Field and Pool
Milne Point Unit / Schrader Bluff
16. Lease Designation and Serial No.
ADL 380109
17. Land Use Permit:
Milne Point Unit
20. Thickness of Permafrost
1800' (Approx.)
AMOUNT PULLED
24. TUBING RECORD
SIZE DEPTH SET (MD)
4-1/2"x 3-1/2", 12.6# x 9.2#, L-80 10040'
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
Electric Submersible Pump
OIL -BBL GAs-McF
1685 247
OIL-BBL GAs-McF
42"
13-112"
10159'
13091 '
9-7/8"
6-1/8"
25.
PACKER SET (MD)
9984'
ACID, FRACTURE, CEMENT SQUEEZE,
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 95 Bbls of Diesel.
26.
Date First Production:
October 10, 2003
Date of Test Hours Tested PRODUCTION FOR
10/9/2003 6 TEST PERIOD ...
Flow Tubing Casing Pressure CALCULATED ...
Press. 24-HoUR RATE
27. CORE DATA
- '.;.. - ,--- ,-
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attacllse'p9R3te-.$I1eet, if necessary).
Submit core chips; if none, state "none". . . ..
None
WATER-BsL
o
W A TER-BsL
ABDMS BfL
NOV 12 21!~ R ¡ GIN A L
Form 10-407 Revised 2/2003
CONTINUED ON REVERSE SIDE
I GAS-OIL RATIO
146
OIL GRAVITY-API (CORR)
CHOKE SIZE
- ~~ ð
~v
28.
SBF2-NA
SBF21
SBF1-NB
SBF1-NBR
SBF12
SBE4-NC
SBE41
SBE2-NE
GEOLOGIC MARKERS.
NAME MD TVD
9846' 4038'
9868' 4044'
9943' 4064'
9971' 4071'
10020' 4083'
10077' 4097'
10113' 4105'
10160' 4115'
29. eMATION TESTS
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
None
,~ "
30. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary Report.
31. I hereby certify that the fore oing is true and correct to the best of my knowledge.
Signed Title Technical Assistant
~
203-144
MPS-34L2
Well Number
Permit No. / Approval No.
Date to- ~ û-O~
Prepared By Name/Number:
Drilling Engineer:
Sandra Stewman, 564-4750
Matt Green, 564-5581
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
Form 10-407 Revised 2/2003
ITEM 29: List all test information. If none, state "None".
ORfGINAL
.
003~-JLjL{
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
October 13, 2003
RE: MWD Formation Evaluation Logs MPS-34 L2,
AK-MW-2600988
1 LIS formatted Disc with verification listing. I c9 19 \
API#: 50-029-23171-61
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
Signed~é')\ ~ )V"'~"-~~
~~".. <:..
.. \'''' \':) \') n \ \.J-~
. STATE OF ALASKA .
ALAS~ AND GAS CONSERVATION COM· ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: 1m Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
GYRO, MWD , GR , PWD , ABI / IFR / CASANDRA , RES
CASING, LINER AND CEMENTING RECORD
seT'tINGDèÞTIi
BOTTOM
110'
5518'
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3252' NSL, 412' WEL, SEC. 12, T12N, R10E, UM
Top of Productive Horizon:
1920' NSL, 2530' WEL, SEC. 02, T12N, R10E, UM
Total Depth:
4662' NSL, 926' WEL, SEC. 02, T12N, R10E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 565599 y- 5999917 Zone- ASP4
TPI: x- 558166 y- 6003804 Zone- ASP4
Total Depth: x- 559746 y- 6006558 Zone- ASP4
18. Directional Survey 1m Yes 0 No
22.
20"
10-3/4"
94#
45.5#
H-40
L-80
35'
34'
7-5/8"
4-1/2"
29.7#
12.6#
L-80
L-80
32'
10137'
23. Perforations open to Production (MD + TVD of To,e and
Bottom Interval, Size and Number; if none, state' none"):
4-1/2" Slotted Liner
MD TVD MD TVD
10224' -13047' 4125' - 4147'
26.
Date First Production:
Not On Production
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD ...
Flow Tubing Casing Pressure CALCULATED ..........
Press. 24-HoUR RATE7
260 sx Arctic Set (Approx.)
935 sx PF 'L', 371 sx Class 'G'
Top Job ( 54 sx PF 'L')
725 sx Class 'G'
Uncemented Slotted Liner
One Other
5. Date Comp., Susp., or Aband.
9/1/2003 -
6. Date Spudded
8/26/2003
7. Date T.o. Reached
08/28/2003
8. Elevation in feet (indicate KB, OF, etc.)
KBE = 72.30'
9. Plug Back Depth (MD+ TVD)
13454 + 4322 Ft
10. Total Depth (MD+TVD)
13454 . + 4322 Ft
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
42"
13-1/2"
10159'
13091'
9-7/8"
6-1/8"
SIZE
4-1/2"x 3-1/2", 12.6# x 9.2#, L-80
1b. Well Class:
1m Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit Number
203-144
13. API Number
50- 029-23171-61-00
14. Well Number
MPS-34L2
15. Field and Pool
Milne Point Unit / Schrader Bluff
16. Lease Designation and Serial No.
ADL 380109
17. Land Use Permit:
Milne Point Unit
20. Thickness of Permafrost
1800' (Approx.)
DEPTH SET (MD)
10040'
PACKER SET (MD)
9984'
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 95 Bbls of Diesel.
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
OIL-BBL GAs-McF WATER-BBL
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
r--»--
I COMPLETION '1
f DATE__> I
'. .!t. \:;[;f:f-.;5 J R· t G \ N A L
I~::¿;~"~_~ I
OIL-BBL
27.
None
Form 10-407 Revised 2/2003
GAs-McF
W A TER-BBL
CHOKE SIZE I GAS-OIL RATIO
OIL GRAVITY-API (CORR)
OC1 2 \JiGU3
CONTINUED ON REVERSE SIDE
RBDMS BFL.
0('::
28. GEOLOGIC MARKER. 29. eRMATION TESTS
Include and briefly summarize test results. List intervals tested,
NAME MD TVD and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
SBF2-NA 9846' 4038' None
SBF21 9868' 4044'
SBF1-NB 9943' 4064'
SBF1-NBR 9971' 4071'
SBF12 10020' 4083'
SBE4-NC 10077' 4097'
SBE41 10113' 4105'
SBE2-NE 10160' 4115'
30. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary Report.
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Sondr Stew an -\ Title Technical Assistant
Date I 0 - oS-03
-
MPS-34L2
Well Number
203-144
Permit No. I Approval No.
Prepared By Name/Number:
Drilling Engineer:
Sondra Stewman, 564-4750
Matt Green, 564-5581
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Oq!GfNAL
Form 10-407 Revised 2/2003
....
.
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-34
MPS-34
ORIG DRILLING
DOYON DRILLING INC.
DOYON 14
Start: 8/10/2003
Rig Release:
Rig Number:
Spud Date: 8/11/2003
End:
Date Frorn-Tb Hours Task Codê NPT Phase DescriptionofOpètatibns
8/11/2003 00:00 - 00:30 0.50 MOB P PRE Skid rig floor from drlg position to move position
00:30 - 02:30 2.00 MOB P PRE Move rig from MPS-02i to MPS-34
02:30 - 03:00 0.50 MOB P PRE Skid rig floor from move position to drlg position
03:00 - 03:30 0.50 MOB P PRE Rig up floor
03:30 - 05:30 2.00 MOB P PRE Accept rig @ 03:30 Hrs 8/11/2003 - Nipple up divertor
05:30 - 12:00 6.50 DRILL P SURF Load pipe shed with 4" dp - Pick up 195 Jts of 4" dp - Stand
back in derrick
12:00 - 13:30 1.50 DRILL P SURF Pick up flex dc's - 5" hwdp - stand back in derrick
13:30 - 14:00 0.50 DRILL P SURF Pick up short bha up beaver slide
14:00 - 15:00 1.00 DRILL P SURF Make up bit / motor/ mwd - orient same - con't make up bha
15:00 - 15:30 0.50 DRILL P SURF Function test divertor - Accumulator test - Witness of test
waived by Chuck Scheve with AOGCC - Hang sheeve and line
for Gyro in derrick
15:30 - 16:00 0.50 DRILL P SURF Conduct pre spud meeting with all personnel - Fill stack with
mud - check for surface leaks -
16:00 - 00:00 8.00 DRILL P SURF Spud in well S-34 - Directional drill from 112' to 930' - WOB
35K to 40K - RPM 80 - TO on 5K - off 1K - GPM 423 - PP on
1400 - off 1120 - PU 93K - SO 93K - ROT 93K - Rigged down
Gyro survey equipment (two gyro surveys ran)
8/12/2003 00:00 - 14:30 14.50 DRILL P SURF Directional Drill from 930' to 3018' - WOB 40K - GPM 502 - PP
2650 - off 2300 - RPM 80 - TO on 10 k - off 5 k - PU 1 02K - SO
77K - ROT 95K
14:30 - 16:30 2.00 DRILL P SURF CBU 3X - GPM 502 - PP 2300 - RPM 80 - TO 5K - PU 105K-
SO 78K - ROT 95K - Circ from 3018' to 2928' - 30 mins - stand
back one stand - Circ from 2928' to 2832' - 30 mins - stand
back one stand - Circ from 2832 to 2736' to bottoms up -
16:30 - 18:30 2.00 DRILL P SURF Pump out from 2736' to 815' to HWDP - no problems - hole in
good shape
18:30 - 19:30 1.00 DRILL P SURF RIH from 815' to 1550' bridge - work through bridge to 1580'-
RIH to 1600' bridge - work through bridge to 1638' - Con't RIH
to 2826' hit bridge
19:30 - 22:00 2.50 DRILL N DPRB SURF Attempt to work through bridge @ 2826' - Pump at 1/2 drlg rate
GPM 250 - Attempt to wash through bridge - Pump at full rate -
Orient to high side 10L - Re-drill from 2826' to 3018'
22:00 - 00:00 2.00 DRILL P SURF Directional drill from 3018' to 3306' - WOB 40K - RPM 80 - TQ
on 10K - off 6K - GPM 503 - PP on 2700 - off 2400 - PU 103K -
SO -75K - ROT 91K
8/13/2003 00:00 - 15:00 15.00 DRILL P SURF Directional Drill from 3311' to 5526' - WOB 45K - GPM 503 -
PP on 3750 - off 3280K - RPM 80 - TQ on 15K - off 7K - PU
125K - SO 70K - Rot 95K
15:00 - 19:00 4.00 CASE P SURF CBU 3 X - RPM 100 - TQ 7K - GPM 503 - PP 3200 - PU 125K-
SO 70K - ROT 95K
19:00 - 23:00 4.00 CASE P SURF Pump out from 5526' to 817' - Pump out drlg rate - 445 gpm -
tight spot @ 5035'
23:00 - 00:00 1.00 CASE P SURF RIH from 815' to 3800' - Tight 1536'
8/14/2003 00:00 - 01 :00 1.00 CASE P SURF RIH - from 3800' to 5526' - Wash last stand to bottom
01 :00 - 04:00 3.00 CASE P SURF CBU 3 X - GPM 503 - PP 3300 - RPM 100 - TQ 7K - PU 125 -
SO 65K - ROT 94K
04:00 - 07:30 3.50 CASE P SURF Pump out from 5526' to 815' HWT - 1 st ten stands pumped at
5 bpm laying lubricate pill across bottom 900 feet - (from 5526'
to 4626') - Pump out at drlg rate 445 GPM
07:30 - 09:30 2.00 CASE P SURF Rack back 5" HWT - Stand back 6.75" Flex dc's - Lay down 8"
bha
Printed: 91212003 9:55:32 AM
.
.
BP EXPLORATION
Operations Summary Report
Page 2 of 8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-34
MPS-34
ORIG DRILLING
DOYON DRILLING INC.
DOYON 14
Start: 8/10/2003
Rig Release:
Rig Number:
Spud Date: 8/11/2003
End:
Date From-To Hours Task Code NPT Phase Description of Ope rations
8/14/2003 09:30 - 10:30 1.00 CASE P SURF Rig up to run 103/4" - PJSM
10:30 - 16:00 5.50 CASE P SURF Run 133 joints 10 3/4" 1 45.5# 1 L-80 1 BTC casing - Set down
at 1800' - Work pipe down without circulating - Con't run pipe
minor problems to 2800' - No problems in tangent section -
Land pipe with 30K pipe weight left
16:00 - 16:30 0.50 CASE P SURF Rig down Franks fill up tool - Rig up Howco Cementing head -
Break circulation
16:30 - 20:00 3.50 CASE P SURF Circulate 1 Condition mud for cement job - Start @ 2.8 bpm 440
psi· staging up to 10 bpm 420 psi
20:00 - 22:30 2.50 CEMT P SURF Howco pump 10 bbls water - Test lines to 3500 psi - Pump 10
bbls water - Pump 75 bbls Alpha spacer - mixed at 10.2 ppg-
(one gallon dye first 5 bbls spacer pumped) - Drop bottom plug
on fly of last 5 bbls spacer pumped - Mix and pump 935 sxs
691 bbls Type "L" Yeild 4.15 cf/sx -mixed @ 10.7 ppg -7 bpm-
Mix and pump 375 sxs 76 bbls Class "G" with 2 % Cacl 1 Yeild
1.15 cf/sx - mixed @ 15.8 ppg - 5 bpm 500 psi - Drop top plug -
Kick out with Howco 30 bbls water 5 bpm 650 psi - Displace
with Rig - 5 bpm 900 psi - Lost returns 210 bbls pumped-
Regain retruns 230 bbls pumped
8/15/2003 00:00 - 01 :00 1.00 CEMT P SURF Con't displacing cement with rig @ 4 bpm 1120 psi - Lost
retruns total returns after displacing 290 bbls - Con't displacing
4 bpm @ 1500 psi - Total displacement 522 bbls - Bump plug
with 2500 psi - 1000 over - Held pressure for 5 mins - Bled off
pressure - floats holding - No Cement to surface - (Did see
spacer with dye back)
01 :00 - 02:00 1.00 CASE P SURF Flush Divertor - Flowline - Break and lay down Howco
cementing head - Lay down casing tools - lay down landing
joint
02:00 - 03:00 1.00 CASE P SURF Nipple down divertor
03:00 - 03:30 0.50 CASE N CEMT SURF Prepare for top job - Install hoses 1 lines in cellar for Super
sucker 1 vac truck - 1" pipe in pipe shed - Pick up handling tools
for 1" pipe-
03:30 - 05:00 1.50 CASE P SURF Change out saver sub on top drive - Top drive service
05:00 - 07:00 2.00 CEMT N CEMT SURF RIH with 1" CS hydrill tubing - Tag up hard at 134' RKB
measurements - Pump 50 bbls fresh water to flush conductor
pipe - Followed by 54 sxs ofType "L" - Yield 4.15 cf/sx - 224 cf
- 40 bbls slurry mixed at 10.5 ppg -10 bbls of 10.5 ppg cement
to surface - Left in hole 30 bbls of slurry - 40 sxs
07:00 - 08:00 1.00 CASE P SURF Nipple up 12" FMC Casg head - metal to metal seal - 11" x 11"
5M G5 tubing head - Test to 1000 psi for 10 mins
08:00 - 09:30 1.50 CASE P SURF Nipple up BOP's
09:30 - 10:00 0.50 CASE P SURF Install test plug - Rig up testing equipment
10:00 - 13:00 3.00 CASE P SURF Test BOP's - 250 low 2500 high Annular each test 5 mins - 250
low 3500 high - Top pipe rams - Bottom rams - Blind rams-
Choke manifold - Hyd Kill 1 Choke valves - Manual Kill 1 Choke
valves - Upper 1 Lower IBOP - Floor safety valve - Floor dart
valves - Each test 5 mins - John Crisp with AOGCC waived
witness of BOP test
13:00 -13:30 0.50 CASE P SURF Pull test plug - Install wear ring - Close annulus valves - Rig
down test equipment
13:30 - 14:00 0.50 CASE SURF Pick up short bha up beaver slide
14:00 - 15:30 1.50 CASE P SURF Pick up motor 1.22 degree - make up bit - MWD / GR 1 RES /
PWD - orient same - Con't make up BHA
Printed: 91212003 9:55:32 AM
.
.
BPEXPLORATION
Operations SUr11hläryReport
8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-34
MPS-34
ORIG DRILLING
DOYON DRILLING INC.
DOYON 14
Start: 8/10/2003
Rig Release:
Rig Number:
Spud Date: 8/11/2003
End:
Date From- To Höurs Task Code NPT Phase Description of Operations
8/15/2003 15:30 - 16:00 0.50 CASE P SURF RIH HWT - Surface test MWD @ 726' - 400 gpm 1150 psi
16:00 - 17:30 1.50 CASE P SURF RIH from 726' to 5332'
17:30 - 18:30 1.00 CASE P SURF Break circulation - Test 10 3/4" casing to 2500 psi for 30 mins -
Record on chart
18:30 - 19:30 1.00 CASE P SURF Cut drilling line
19:30 - 20:30 1.00 DRILL P SURF Drill Flequipment - cement - 20" new hole from 5526' to 5546'
20:30 - 22:00 1.50 CASE P SURF Circulate conditioning mud for FIT - GPM 400 - PP 2100 psi -
50 RPM - TQ 7K
22:00 - 22:30 0.50 CASE P SURF Perform FIT - Hole T.D. 5546 MD - Shoe 5518' MD - 2894' TVD
- Mud weight 8.9 ppg - Surface pressure 400 = 11.56 ppg EMW
- Recorded on chart
22:30 - 00:00 1.50 DRILL P INT1 Spot new mud at bit - Drill from 5546' to 5750' - WOB 30K -
RPM 120 - TO on 11K - off 7K - GPM 400 - PP on 1920' - off
1820' - PU 145K - SO 70K - ROT 98K
8/16/2003 00:00 - 23:00 23.00 DRILL P INT1 Directional Drill from 5750' to 8846' - WOB 30K - RPM 120 -
TQ on 9K - off 7K - GPM 423 - PP on 2980 - off 22790 - PU
133K - SO 82K - ROT 106K
23:00 - 00:00 1.00 DRILL P INT1 CBU 3 X - GPM 440 - PP 2700 - RPM 120 - TO 7.5K - PU 133
- SO 82 - ROT 105
8/17/2003 00:00 - 02:30 2.50 DRILL P INT1 Con't CBU 3 X - GPM 45 - PP 2600 - RPM 120 - TQ 8K - PU
134K - SO 83K - ROT 107K
02:30 - 05:30 3.00 DRILL P INT1 Pump out from 8846' to 5427' - @ Drlilling rate 430 gpm - Tight
spot 7250' - 7205 to 7070' ratty - 6568 to 6530 ratty
05:30 - 08:00 2.50 DRILL P INT1 Monitor well - Well static - Pump dry job - POH from 5427' to
BHA @ 726'
08:00 - 09:00 1.00 DRILL P INT1 Download - Upload MWD
09:00 - 10:00 1.00 DRILL P INT1 Break off bit - reset motor from 1.22 to 1.5 - Make up new bit -
Orient MWD - RIH with 6.5" flex dc's - 5" HWT
10:00 - 12:00 2.00 DRILL P INT1 RIH from 726' to 5550' - Test MWD with bit and motor out shoe
12:00 - 13:00 1.00 DRILL P INT1 Con't RIH from 5550' to 8846' - Hole in good shape - No tight
spots
13:00 - 00:00 11.00 DRILL P INT1 Directional Drill from 8846' to 9960' - WOB 40K - RPM 80 - TO
on 12K - off 9K - GPM 423 - PP on 3320 - off 3150 - PU 150K-
SO 80K - ROT 113K - Add two drums E-P Mud lube to slick up
casing - Added 3% Lubricants with IDLube and Lubetex
8/18/2003 00:00 - 14:30 14.50 DRILL P INT1 Directional Drill from 9960' to 11159' - T.D. 97/8" hole - WOB
40K - RPM 80 - TQ on 10K - off 9K - GPM 423 - PP on 3830-
off 3510 - PU 150K - SO 83K - ROT 114K
14:30 - 17:30 3.00 CASE P INT1 CBU 2 X - (20000 strokes) - GPM 423 - PP 3700 - RPM 100-
TQ 8K - PU 150K - SO 83K - ROT 115K
17:30 - 20:30 3.00 CASE P INT1 Pump out from 11159' to 8000' - Pump at drilling rate 423 gpm
- Hole in good shape - No problems
20:30 - 21 :30 1.00 CASE P INT1 RIH frrom 8000' to 11159' - No problems - Hole in good shape
21 :30 - 00:00 2.50 CASE P INT1 CBU 3 X - (30000 strokes) - GPM 423 - PP 3770 - RPM 100-
TQ 8K - PU 150K - SO 83K - ROT 114K
8/19/2003 00:00 - 02:30 2.50 CASE P INT1 Con't CBU 3 X - GPM 423 - PP 3680 - RPM 100 - TQ 9K - PU
150K - SO 83K - ROT 115K - Lots of thick mud back on
bottoms up 10,000 strokes - 12,000 strokes - 16,500 strokes
02:30 - 04:30 2.00 CASE P INT1 Pump out from 11159' to 8782' - Pump at drlg rate 423 gpm -
3380psi
04:30 - 05:00 0.50 CASE P INT1 Pull out 8782' to 8302', well not taking proper fill
05:00 - 06:00 1.00 CASE P INT1 Pump out from 8302' to 7630' - Pump at drlg rate 423 gpm
06:00 - 07:00 1.00 CASE P INT1 Pull out 7630' to 5427' Monitor well, hole static
Printed: 9/212003 9:55:32 AM
.
.
BP EXPLORATION
Operations Summary Report
Page 40f 8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-34
MPS-34
ORIG DRILLING
DOYON DRILLING INC.
DOYON 14
Start: 8/10/2003
Rig Release:
Rig Number:
Spud Date: 8/11/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
8/19/2003 07:00 - 08:00 1.00 CASE P INT1 Slip and cut drilling line
08:00 - 10:00 2.00 CASE P INT1 Trip in hole, ream from 11088'1 11159'
10:00 - 15:00 5.00 CASE P INT1 Circ. three bottoms up, with 449 gpm. 3700 psi, 100 rpms, 8k
torque, P/U 150k SIO 87k, RTW 116k
15:00 - 20:00 5.00 CASE P INT1 Flow check, pull out of hole to BHA, No problems, getting P/U
and SIO wt. every 10 sds
20:00 - 22:30 2.50 CASE P INT1 Laying down BHA, clear floor
22:30 - 00:00 1.50 CASE P INT1 Change top rams to 7 5/8, remove saver sub from top drive to
install TESCO CDA tool
8/20/2003 00:00 - 04:00 4.00 CASE P INT1 Installing TESCO CDA tool, as per Tesco tech. install
extension sub on top drive, fit anti-rotation device, re-install
torque rings on top drive, and Dan Glacken fell backwards off
ladder from bottom step and landed on his back, send to medic
to be checked
04:00 - 05:00 1.00 CASE N HMAN INT1 Safety stand down, meeting with all hands on regarding fall
from ladder
05:00 - 06:00 1.00 CASE P INT1 Installing CDA tools
06:00 - 06:30 0.50 CASE P INT1 Test BOP door seals to 1500 psi, rig down test Eqp. and clear
floor
06:30 - 09:00 2.50 CASE N HMAN INT1 Shut down for Accident investigation
09:00 - 14:30 5.50 CASE P INT1 PJSM with Tesco Techs on running csg, Picking up 7 5/8
29.7# L-80 csg. getting pick up and slack off wt.S every 20 jts
to 3390', bend one grapple on CDA tool
14:30 - 15:00 0.50 CASE N SFAL INT1 Replace bend grapple
15:00 - 17:30 2.50 CASE P INT1 Picking up 7 5/8 29.7# L-80 csg, getting pick up and slack off
wt.S every 20 jts to 5518'
17:30 - 19:00 1.50 CASE P INT1 Circ one full circulation @ shoe with 60 spm 400 psi
19:00 - 00:00 5.00 CASE P INT1 Picking up 7 5/8 29.7# L-80 csg getting pick up and slack off
wt.S every 20 jts, to 9800'
8/21/2003 00:00 - 02:00 2.00 CASE P INT1 Finish Picking up 7 5/8 29.7# L-80 csg getting pick up and
slack off wt.S every 20 jts, to 11159', total of 274 jts.11170 ft,
set @ 11,159, float @ 11,075, P/U 250K, SIO 90K wash last jt
to bottom no fill, no hole problems running csg, CDA tool
worked good, Csg was not rotate with CDA tool.
02:00 - 03:30 1.50 CASE P INT1 Circ. stage up to 6 bbls min. 500 psi full returns, circ one csg
volume 5,120 strokes. Didn't Reciprocate csg
03:30 - 04:00 0.50 CASE P INT1 Rig up cement head
04:00 - 05:30 1.50 CASE P INT1 Circ. 6 bbls min. 500 psi full retums, circ one csg volume
5,120 strokes. Didn't Reciprocate csg
05:30 - 07:30 2.00 CEMT P INT1 Cement with Halliburton with 5 bbls water, test lings 3500 psi,
15 bbls water, 35 bbls Alpha spacer mixed @ 10.5, drop
bottom plug,725 sxs. Class G 156 bbls mixed @ 15.6, drop top
plug, displace with Halliburton with 9.5 Flo-Pro mud, @ 8 bbls
min, pumped 509 bbls bump plug with 1600 psi, full return tru
out job, floats held
07:30 - 08:00 0.50 CEMT P INT1 Rig down cement head
08:00 - 10:30 2.50 CEMT P INT1 Change rams to 2718 X 5", nipple down flow lines, pick up
BOPS
10:30 -11:00 0.50 CEMT P INT1 Set Emergency slips with 150k on slips
11:00 - 12:00 1.00 CEMT P INT1 Make rough cut and final cut as per FMC tecto
12:00 - 14:00 2.00 CEMT P INT1 Nipple up BOPS, rig down Tesco CDA Equip.
14:00 - 15:30 1.50 CEMT P INT1 Install new saver sub, bails and 5" elevators on top drive
15:30 - 16:30 1.00 CEMT P INT1 Install 10 3/4 x 7 5/8 packoff and test same to 3350 psi for 10
Printed: 91212003 9:55:32 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
8/21/2003
8/22/2003
8/23/2003
8/24/2003
8/25/2003
-
.
... --
BP EXPLORATION
MPS-34
MPS-34
ORIG DRILLING
DOYON DRILLING INC.
DOYON 14
Start: 8/10/2003
Rig Release:
Rig Number:
Spud Date: 8/11/2003
End:
From - To Hours Task Code NPT I Phase
15:30 - 16:30
16:30-21:00
21 :00 - 22:00
22:00 - 00:00
00:00 - 02:00
02:00 - 05:00
05:00 - 11 :30
11 :30 - 12:00
12:00 - 16:30
16:30 - 18:00
18:00 - 18:30
18:30 - 21 :00
21 :00 - 22:00
22:00 - 23:00
23:00 - 00:00
00:00 - 02:00
02:00 - 03:00
03:00 - 05:00
05:00 - 06:30
06:30 - 07:00
07:00 - 08:30
08:30 - 09:30
09:30 - 10:00
10:00 - 00:00
00:00 - 00:00
00:00 - 04:30
04:30 - 08:00
08:00 - 10:30
10:30 - 12:00
12:00 - 15:00
15:00 - 16:00
16:00 - 16:30
16:30 - 18:30
18:30 - 22:00
22:00 - 23:30
1.00 CEMT P
4.50 CASE P
1.00 CASE P
2.00 CASE P
2.00 STWHIP P
3.00 STWHIP P
6.50 STWHIP P
0.50 STWHIP P
4.50 STWHIP P
1.50 STWHIP P
0.50 STWHIP P
2.50 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
2.00 STWHIP P
1.00 STWHIP P
2.00 STWHIP P
1.50 STWHIP P
0.50 STWHIP N
1.50 STWHIP P
1.00 STWHIP P
0.50 STWHIP P
14.00 DRILL P
24.00 DRILL P
4.50 DRILL P
3.50 CASE P
2.50 P
1.50 CASE P
3.00 CASE P
1.00 CASE P
0.50 CASE P
2.00 CASE P
3.50 CASE P
1.50 CASE P
INT1
INT1
INT1
INT1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
RREP PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
LNR1
Description of Operations
"_.--
min.
Rip up test BOPS and Manifold 250 psi low. 3500 psi high for 5
min. per test, Hydril250 low, 2500 high, 5 min. per test., Install
wear ring, The right to witness test was wavier by Jeff Jones
AOGCC
Test csg to 3500 psi for 30 min.
Picking up 12-4 3/4 Dc and 16 jts 3.5 HWP pump tru to insure
they are free of rust, stand back in derrick
Picking up 17 jts and cut jt. of 3.5 tubing for space out of
whipstock
Pick up Trip anchor, whipstock, mills and MWD, orient same,
finish picking up BHA # 4
Tripping in with whipstock
Orient to 20 degrees to right of high side, set trip anchor, shear
whipstock
Mill window 10,516 to 10,528' Drill to 10,540', top O-A sand
10515'
Circ and work window, pump sweep 340 gals min 2650 psi
FiTtest with 9.5 MW 340 psi 4198 TVD= 11.0 EMW
Slug pipe, pull out to SHA
Stand back BHA,Lay down MWD and mills
Pick up stack washer and flush out SOPS, Function all rams
Picking up 90 jts 4" drill pipe
Finish picking up 90 jts 4" pipe, Circ. tru pipe to clear out rust
Stand 30 stands in derrick
Clear floor, P/U BHA #5
Tripping in hole To 5,957, Iron roughneck broke
Rig up spinner hawk, PJSM
Tripping in to 10,369
Slip and cut drilling line
Trip in to 10465, Orient to high side, slide tru window
Directional drill from 10540 to 11,392 with 80 rpms, 250 gals
min. 2450 psi
Directional drill from 11,392 to 13,030 with 80 rpms, 250 gals
min. 2550 psi, having lots of trouble sliding,Motor acting weak
stalls to easy, ASI working part time, Lube up to 4%, AST 6.09,
ART 10.25, TQ 6500
Directional drill from 13,030' to 13,232' TD with 80 rpms, 250
gals min. 2550 psi, (went out of O-A 13,160)
Circ, three bottoms up with 100 rpms, 280 gals min 2800 psi
Pump out to Csg shoe, pump to 10561, pull tru window @
10516 with out pumping, no problems pumping out
Circ two bottoms up with 280 gals min 100 rpms 2450 psi
Slug pipe, trip out to BHA
Stand back jars and de., lay down MWD, motor
Rig up to pickup liner, PJSM
Picking up 4.512.6# L-80 slotted liner, total 61 jts slotted, 10 jts
4.512.6# L-80 solid liner 2931', Baker 7518 X 5.5 HMC liner
hanger, Baker 7 5/8 X 5.5 ZXP liner top packer.
Tripping in with liner to 13232', no problems tripping in with
liner,drop ball, pickup wt 145,000, SIO 80,000
Pump ball to seat with 3 bbls min. 900 psi, set hanger with
2500 psi,set packer with 3300 psi, shear ball with 4,300 psi,
Printed: 912/2003 9:55:32 AM
.....
.
BP EXPLORATION
Operations Summary Report
Page 6 of 8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-34
MPS-34
ORIG DRILLING
DOYON DRILLING INC.
DOYON 14
Start: 8/10/2003
Rig Release:
Rig Number:
Spud Date: 8/11/2003
End:
Date FrÔI'l1,,-To Hours Code NPT Phase Description of Operâtiôhs
8/25/2003 22:00 - 23:30 1.50 CASE P LNR1 test liner top packer with 1000 psi on back side,rotate off liner,
pickup wt without liner 126,000, top of tie back sleeve 10274,
packer @ 10280'
23:30 - 00:00 0.50 CASE P LNR1 Flow check, Tripping out with running tools
8/26/2003 00:00 - 03:00 3.00 CASE P LNR1 Tripping out with running tools
03:00 - 03:30 0.50 CASE P LNR1 Lay down running tools
03:30 - 04:00 0.50 STWHIP P PROD2 Clear floor, PJSM
04:00 - 06:30 2.50 STWHIP P PROD2 Pickup 3.5 spacer jts, Baker whipstock and mills,MWD
06:30 - 10:30 4.00 STWHIP P PROD2 Tripping in with whipstock to 10245'
10:30 - 11 :00 0.50 STWHIP P PROD2 Orient 11 degrees to right of high side, set whipstock
11 :00 - 14:00 3.00 STWHIP P PROD2 Mill window, 10159' to 10171' drill to 10184'
14:00 - 15:30 1.50 STWHIP P PROD2 Circ. Two bottoms up, pumped sweep, worked window
15:30 - 18:00 2.50 STWHIP P PROD2 Flow check, POH to BHA
18:00 - 19:00 1.00 STWHIP P PROD2 Stand back DC, lay down MWD,and window mills
19:00 - 20:30 1.50 STWHIP P PROD2 Pickup Johnny Wacker, Flush BOPS stack, and function rams
20:30 - 00:00 3.50 BOPSURP PROD2 Pull wear ring, Test BOPS and manifold 250-3,500 psi 5 min.
per test, Hydril 250-2,500 psi 5 min. per test, install wear ring.
the right to witness test was wavier by Jeff Jones AOGCC.
8/27/2003 00:00 - 01 :30 1.50 DRILL P PROD2 PJSM,Clear floor, Pickup BHA # 7, surface test MWD
01 :30 - 04:30 3.00 DRILL P PROD2 Tripping in to 10,080'
04:30 - 05:30 1.00 DRILL P PROD2 Cut and slip Drilling line
05:30 - 06:00 0.50 DRILL P PROD2 Orient, slide tru window without pumping, tag bottom 10184'
06:00 - 00:00 18.00 DRILL P PROD2 Directional Drill 1 0,184' to 11953" with 80 rpms, 245 gpm, 3000
psi
AST 4.58, ART 6
8/28/2003 00:00 - 16:30 16.50 DRILL P PROD2 Directional Drill 11953' to 13454'TD with 80 rpms, 245 gpm,
3450 psi
16:30 - 20:30 4.00 CASE P PROD2 Circ, four bottoms up with 280GPM, 3800 psi, 100 RPMs
20:30 - 23:30 3.00 CASE P PROD2 Pumping out to window @ 10159,with full drilling rate, pull tru
window with out pumping
23:30 - 00:00 0.50 CASE P PROD2 eire, two bottoms up with 280GPM, 2700 psi, 100 RPMs
8/29/2003 00:00 - 01 :30 1.50 CASE P PROD2 Circ, two bottoms up with 280GPM, 2700 psi, 100 RPMs
01 :30 - 05:00 3.50 CASE P PROD2 Tripping out to BHA
05:00 - 06:00 1.00 CASE P PROD2 Laying down BHA
06:00 - 07:30 1.50 CASE P PROD2 Picking up BHA # 8 Whipstock Retrieving tool., surface test
MWD
07:30 - 10:30 3.00 CASE P PROD2 Trip in to 10130'
10:30 - 11:00 0.50 CASE P PROD2 Orientate, engage whipstock,pull free
11:00-12:00 1.00 CASE P PROD2 Circ bottoms up, 250 gals min. 1800 psi
12:00 - 15:30 3.50 CASE P PROD2 Poh with whipstock
15:30 - 18:00 2.50 CASE P PROD2 Lay down BHA, whipstock, and space out jts.
18:00 - 19:00 1.00 CASE P PROD2 Rig up to pickup liner,PJSM
19:00 - 21 :00 2.00 CASE P PROD2 Picking up Slotted liner 4.512.6# L-80 IBT total 71 jts 2906'
and Baker Hook wall hanger, two centralizers per jt. on slotted
jts
21 :00 - 23:30 2.50 CASE P PROD2 Tripping in with liner to 10150'
23:30 - 00:00 0.50 CASE P PROD2 Working trying to Exit window @ 10159' to 10171'
8/30/2003 00:00 - 01 :00 1.00 CASE P PROD2 Working trying to Exit window @ 10159' to 10171' setting
down on lower liner @ 10273, got out window on the 8th try
01:00 - 02:30 1.50 CASE N DPRB PROD2 Working liner @ 10260' acts like the centralizer in the middle
#3 jt is hanging on bottom of window. P/U wt 125,000 SIO wt
90,000
02:30 - 03:00 0.50 CASE N DPRB PROD2 Pulled above window and went back to lower liner top @
Printed: 91212003 9:55:32 IW
.....
.
'- /
BP EXPLORATION
.·(¡)perë;Jtions Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-34
MPS-34
ORIG DRILLING
DOYON DRILLING INC.
DOYON 14
Date From - To Hours Task Code NPT Phase
8/30/2003
02:30 - 03:00 0.50 CASE N DPRB PROD2
03:00 - 03:30 0.50 CASE N DPRB PROD2
03:30 - 06:30 3.00 CASE N DPRB PROD2
06:30 - 07:00 0.50 CASE N DPRB PROD2
07:00 - 11 :30 4.50 CASE N DPRB PROD2
11 :30 - 12:00 0.50 CASE N DPRB PROD2
12:00 - 15:30 3.50 CASE N DPRB PROD2
15:30 - 18:00 2.50 CASE N DPRB PROD2
18:00 - 21 :30 3.50 CASE N DPRB PROD2
21 :30 - 23:30 2.00 CASE P PROD2
23:30 - 00:00 0.50 CASE P PROD2
8/31/2003 00:00 - 01 :00 1.00 CASE P PROD2
01 :00 - 05:00 4.00 CASE P PROD2
05:00 - 05:30 0.50 CASE P PROD2
05:30 - 08:30 3.00 CASE P PROD2
08:30 - 09:30 1.00 CASE P PROD2
09:30 - 12:00 2.50 CASE P PROD2
12:00 - 17:30 5.50 CASE P PROD2
17:30 - 19:00 1.50 CASE P PROD2
19:00 - 00:00 5.00 CASE P PROD2
9/1/2003 00:00 - 05:00 5.00 CASE P PROD2
05:00 - 06:30 1.50 CASE P PROD2
06:30 - 07:30 1.00 BOPSUR.P PROD2
07:30 - 09:00 1.50 WHSUR P PROD2
09:00 - 09:30 0.50 WHSUR P PROD2
09:30 - 10:00 0.50 CASE P PROD2
10:00 - 10:30 0.50 CASE P PROD2
Page of8
Start: 8/10/2003
Rig Release:
Rig Number:
Spud Date: 8/11/2003
End:
10273'
Orient and went out window on 3rd try, to 10260' and liner still
hanging up @ same spot.
POH to liner hanger
inspect liner hanger,stand back in derrick
PJSM, lay down liner found two centralizers pushed up to collar
onjt.#2
Service top drive
Picking up Slotted liner 4.512.6# L-80 IBT total 71 jts 2906'
and Baker Hook wall hanger, no centralizers on jt. 1 tru 3, one
centralizer per jt on jts 4 tru 6, two centralizers per jt on 7 tru
70, no centralizer on jt 71, stop rings welded in middle of jt.
Tripping in with liner to 10165'
Working pipe to locate window, exit window after 24 attempts
Tripping in with liner had to beat centralizers past bottom of
window for app. 1300' the rest went with no problems, hole
was slick, pickup wt. 134,000 SIO 80,000
Hooking liner hanger, took 6 attempts, top of liner tie back
sleeve 10,136' shoe 13,091'
Drop ball, pumped down 3 bbls min.,750 psi, pressure up to
4300 psi, shear ball, release from liner hanger, P/U wt 125,000
Slug pipe, Tripping out with running tools, laying down 105 jts
of excess drill pipe.
Laying down liner running tools
Pick up Johnny Wacker tripping in to 10,070'
Slip and cut drilling line
Displace hole with 9.5 brine with Inhibitor, with 10 bbls min. 120
rpms, 3050psi
PJSM, laying down excess drill pipe, stand 40 stands in derrick
Pull wear ring, Rig up I-wire spool, rig up tubing tongs, count
tubing
Picking up, 3.5 tail pipe assem. Baker 7 5/8x 4.5 Premier
packer, and Phoenix jet pump sensors and gauge, picking up
4.512.6# L-80 IBT Tubing with I-wire to 4,312'
Finish picking up 4.512.6# L-80 1ST Tubing with I-wire to
10,040.05
total of 237 jts, tail pipe 10,040, XN 10034, packer, 9984, x
nipple 9973, Phoenix Sensor 9957, Sliding sleeve 9934,
Phoenix pressure gauge 9923, GLM 2101'
Picking up FMC hanger and land tubing P/U 115K, SIO 83K
123 Clamps. 123 cannon clamps used. Test I-Wire. RILDS and
test TWC to 300 psi from below. Clear rig floor.
Nipple down BOP stack.
Nipple up FMC 11" X 4-1/16" 5000# Tubing Head Adapter. Run
control line through adapter and test pack off to 3500 psi.
Nipple up 4-1/16" CIW 5000# tree and test tree to 4000 psi.
Open annulus valve and pulled TWC with dry rod. Dropped
Balllrodlroller assembly down tubing.
Rig up line to tubing for pressure test.
Pressure on to tubing to 2500 psi to set packer, continued
pressuring up to 3000 psi with rig pump. Switched to test pump
and continued pressuring up slowly to 3800 psi and suddenly
lost pressure on tubing to 400 psi. No flow on annulus.
Printed: 9/2/2003 9:55:32 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
From - To
9/1/2003
10:00 - 10:30
.....
..
" ~-~
BP EXPLORATION
Operations Summary Report
MPS-34
MPS-34
ORIG DRILLING
DOYON DRILLING INC.
DOYON 14
0.50 CASE P
Page 8 of 8
Start: 8/10/2003
Rig Release:
Rig Number:
Spud Date: 8/11/2003
End:
Description of Operations
PROD2 Attempted to pressure up on tubing and pumped 3 bbls and
pressure on tubing increased to 800 psi and began pumping
into formation. Appeared that the RHC plug sheared (set to
shear at 4900 psi).
Pressure test casing to 1000 psi for 10 minutes with no bleed
off.
Freeze protected 10-3/4" X 7-518" annulus with 95 bbls of
diesel. Installed TWC and tested to 1000 psi from the top.
RID circ. hoses and test eguip. secure well
Rig Release @ 1500 hrs 9/1/2003
10:30 -11:30 1.00 CASE P PROD2
11 :30 - 12:00 0.50 WHSUR P PROD2
12:00 - 15:00 3.00 CASE P PROD2
Printed: 91212003 9:55:32 AM
Legal Name: MPS-34
Common Name: MPS-34
Test Date
8/15/2003
8/22/2003
FIT
FIT
Test Type
Test Depth (TMD)
5,546.0 (ft)
10,515.0 (ft)
BP EXPLORATION
Leak-Off Test Summary
Test Depth (TVD)
2,893.0 (ft)
4,198.0 (ft)
AMW
8.90 (ppg)
9.50 (ppg)
Surface Pressure
400 (psi)
340 (psi)
Leak Off Pressure (BHP)
1 ,738 (psi)
2,412 (psi)
Page 1 of 1
EMW
11.56 (ppg)
11.06 (ppg)
.
.
Printed: 912/2003 9:55:17 AM
.
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-34 L2
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
10,153.41' MD
10,159.00' MD
13,454.00' MD
(if applicable)
.
ð03 -JL/1
16-Sep-03
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment( s)
-
~DN"'~
Sperry-Sun Drilling Services
\.....
MilnePoìntUhit
BPXA
MilnePoiñtMPS
MPS-34L2
Job No. AKZZ0002600988, Surveyed: 28 August, 2003
Survey\Report
16 September, 2003
Your Ref: APlS00292317161
Surface Coordinates: 5999917.12 N, 565598.66 E . (70" 24' 36.7947" N, 149027' 57.0634" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 999917.12 N, 65598.66 E (Grid)
Surface Coordinates relative to Structure: 51.32 5, 746.82 W (True)
Kelly Bushing: 72.30ft above Mean Sea Level
Elevation relative to Project V Reference: 72.30ft
Elevation relative to Structure: 72.30ft
BI:3Elr"r"\-SU"
DFHLL.'NG SERViCeS
A Halliburton Company
DEFINITIVE
.
.
Survey Ref: svy1256
, Sperry-Sunta~((!tlJl,~ervices
Survey Report forMII".~/¡¡~1I("S.- MPS-34L2
Your Ref: A~/5tJ!!~92311161
Job No. AKZZ00026009BB, Surveyed: 2B August, 2003
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
10153.41 77. 760 341.880 4041.06 4113.36 3942.32 N 7401.22 W 6003794.28 N 558163.10 E 5167.63 Tie On Point
10159.00 77.660 342.220 4042.25 4114.55 3947.51 N 7402.90 W 6003799.46 N 558161.38 E 6.206 5173.04 Window Point
10202.92 82.060 344.160 4049.98 4122.28 3988.89 N 7415.39 W 6003840.73 N 558148.52 E 10.921 5215.96
10235.72 86.480 345.580 4053.26 4125.56 4020.39 N 7423.91 W 6003872.15 N 558139.73 E 14.147 5248.45
, 10267.93 87.840 346.970 4054.85 4127.15 4051.64 N 7431.54 W 6003903.33 N 558131.82 E 6.034 5280.56
"--
1 0298.87 87.530 348.300 4056.10 4128.40 4081.83 N 7438.16W 6003933.47 N 558124.94 E 4.410 5311.44 .
10332.72 89.820 351.920 4056.88 4129.18 4115.16 N 7443.97 W 6003966.74 N 558118.83 E 12.651 5345.28
10364.96 90.560 353.040 4056.78 4129.08 4147.12 N 7448.19W 6003998.67 N 558114.33 E 4.164 5377.49
10395.26 90.370 353.370 4056.53 4128.83 4177.21 N 7451.77 W 6004028.72 N 558110.48 E 1.257 5407.74
10428.33 90.560 353.100 4056.26 4128.56 4210.05 N 7455.67 W 6004061.52 N 558106.30 E 0.998 5440.75
10460.21 89.320 355.660 4056.30 4128.60 4241.77 N 7458.79W 6004093.22 N 558102.90 E 8.922 5472.54
10490.84 88.640 358.590 4056.84 4129.14 4272.36 N 7460.33 W 6004123.79 N 558101.10 E 9.818 5502.92
10524.20 88.090 2.290 4057.79 4130.09 4305.70 N 7460.07 W 6004157.13 N 558101.06 E 11.208 5535.71
10556.23 87.840 6.100 4058.93 4131.23 4337.61 N 7457.73 W 6004189.07 N 558103.12 E 11.913 5566.74
10586.87 86.970 9.600 4060.32 4132.62 4367.93 N 7453.55 W 6004219.42 N 558107.03 E 11.759 5595.87
10618.98 87.470 11.750 4061.88 4134.18 4399.45 N 7447.61 W 6004250.98 N 558112.70 E 6.867 5625.87
10651.91 85.680 15.190 4063.84 4136.14 4431.41 N 7439.96 W 6004283.01 N 558120.07 E 11 .759 5656.02
10682.49 88.390 17.060 4065.43 4137.73 4460.74 N 7431.48 W 6004312.42 N 558128.29 E 10.762 5683.43
10732.57 88.950 20.810 4066.59 4138.89 4508.09 N 7415.23 W 6004359.91 N 558144.12 E 7.569 5727.24
10777.44 88.330 23.420 4067.65 4139.95 4549.64 N 7398.35 W 6004401.61 N 558160.64 E 5.977 5765.23
10827.89 89.880 27.390 4068.44 4140.74 4595.20 N 7376.71 W 6004447.35 N 558181.88 E 8.447 5806.34
10873.86 90.190 30.790 4068.41 4140.71 4635.36 N 7354.36 W 6004487.71 N 558203.87 E 7.427 5842.01
10924.01 91.300 32.370 4067.76 4140.06 4678.08 N 7328.10 W 6004530.66 N 558229.75 E 3.850 5879.52 .
10970.12 91.240 33.090 4066.74 4139.04 4716.86 N 7303.18 W 6004569.65 N 558254.33 E 1.567 5913.38
11019.92 91.110 36.170 4065.72 4138.02 4757.82 N 7274.89 W 6004610.86 N 558282.26 E 6.189 5948.81
11066.08 90.370 36.890 4065.12 4137.42 4794.91 N 7247.41 W 6004648.19 N 558309.41 E 2.237 5980.57
11116.30 87.280 35.830 4066.15 4138.45 4835.34 N 7217.65 W 6004688.88 N 558338.82 E 6.505 6015.21
11161.65 87.400 31.990 4068.26 4140.56 4872.93 N 7192.38 W 6004726.69 N 558363.76 E 8.462 6047.84
11210.40 87.280 35.180 4070.52 4142.82 4913.49 N 7165.45 W 6004767.49 N 558390.33 E 6.541 6083.11
11259.01 87.590 40.270 4072. 70 4145.00 4951.89 N 7135.74 W 6004806.14 N 558419.70 E 10.480 6115.77
11309.28 87.660 41.270 4074.78 4147.08 4989.93 N 7102.95 W 6004844.47 N 558452.16 E 1.992 6147.53
11354.54 87.960 40.770 4076.51 4148.81 5024.05 N 7073.26 W 6004878.85 N 558481.54 E 1.288 6175.98
11405.17 88.150 40.150 4078.23 4150.53 5062.55 N 7040.43 W 6004917.64 N 558514.04 E 1.280 6208.20
11451.18 88.520 39.330 4079.57 4151.87 5097.91 N 7011.03 W 6004953.26 N 558543.13 E 1.955 6237.92
11501.50 88.950 38.520 4080.68 4152.98 5137.05 N 6979.42 W 6004992.67 N 558574.39 E 1.822 6270.97
-~--- --------_._-_._--_.,-_.,-----_._---_._-~
16 September, 2003 - 7:15 Page 20f5 DrillQuest 3.03.02.005
Sperry-Sun Qrilling Services
Survey Report for MIlne PolntMPS . MPS·34L2
Your Rei: API 500:292317181
Job No. AKZZ0002600988, Surveyed: 28 August, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
11547.12 88.950 37.740 4081.51 4153.81 5172.93 N 6951.25 W 6005028.80 N 558602.24 E 1.709 6301.41
11596.00 89.810 38.990 4082.04 4154.34 5211.25N 6920.92 W 6005067.39 N 558632.24 E 3.104 6333.89
11642.81 89.880 38.450 4082.17 4154.47 5247.77 N 6891.64 W 6005104.16 N 558661.20 E 1.163 6364.77
11693.69 88.080 38.410 4083.07 4155.37 5287.62 N 6860.02 W 6005144.29 N 558692.46 E 3.539 6398.52
- 11738.82 88.270 38.370 4084.51 4156.81 5322,98 N 6832.01 W 6005179.89 N 558720.16 E 0.430 6428.48
11790.40 88.330 38.340 4086.04 4158,34 5363,41 N 6800,01 W 6005220.60 N 558751,80 E 0.130 6462.74 .
11835.12 92.470 38.410 4085.73 4158,03 5398.46 N 6772,26 W 6005255.89 N 558779.25 E 9.259 6492.43
11884.94 92.280 38.290 4083.66 4155.96 5437.50 N 6741.37W 6005295.20 N 558809.79 E 0.451 6525.52
11932.07 92.220 38.520 4081.81 4154.11 5474.40 N 6712.12 W 6005332.36 N 558838.72 E 0.504 6556.78
11981.51 92.720 36.700 4079.68 4151.98 5513.53 N 6681.98 W 6005371.75 N 558868.52 E 3.814 6590.08
12027.59 93.090 35.260 4077.35 4149.65 5550.77 N 6654.94 W 6005409.22 N 558895.23 E 3.223 6622.06
12079.92 93.400 34.290 4074.39 4146.69 5593.68 N 6625.14 W 6005452.40 N 558924.65 E 1.943 6659.15
12124.18 92.410 32.560 4072.14 4144.44 5630,57 N 6600.79 W 6005489.50 N 558948.67 E 4.499 6691.25
12174.32 92.280 32.890 4070.09 4142.39 5672.72 N 6573.71 W 6005531.88 N 558975.38 E 0.707 6728.05
12220.63 92.650 32.370 4068.10 4140.40 5711.68 N 6548.76 W 6005571.07 N 558999.99 E 1.377 6762.09
12271.02 91.300 33.360 4066.36 4138.66 5753.98 N 6521.43 W 6005613.60 N 559026.94 E 3.322 67¡9.00
12316.82 90,800 34.310 4065.52 4137,82 5792,02 N 6495.94 W 6005651.86 N 559052.10 E 2.344 6832.03
12366.49 90.000 35.180 4065.18 4137.48 5832,83 N 6467.63 W 6005692.92 N 559080.05 E 2.379 6867.31
12409.62 89.630 37.580 4065.32 4137.62 5867.55 N 6442.05 W 6005727.86 N 559105.32 E 5.630 6897.06
12464.03 89.440 38.760 4065.76 4138.06 5910.33 N 6408.43 W 6005770.93 N 559138.57 E 2.197 6933.35
12508.31 90.370 38.800 4065.83 4138.13 5944,84 N 6380.69 W 6005805.69 N 559166.00 E 2.102 6962.52
12557.81 90.740 38.700 4065.35 4137.65 5983.45 N 6349.71 W 6005844.57 N 559196,64 E 0.774 6995.16
12604.15 89.320 38.420 4065.33 4137.63 6019.68 N 6320.83 W 6005881.05 N 559225.21 E 3.123 7025.83 .
12654.22 89.570 38.550 4065.81 4138.11 6058.87 N 6289.67 W 6005920.52 N 559256.02 E 0.563 7059.01
12700.50 89.510 37.440 4066.18 4138.48 6095.34 N 6261.18 W 6005957.24 N 559284.19 E 2.402 7089.98
12750.32 89.440 36.850 4066.64 4138.94 6135.05 N 6231.10 W 6005997,21 N 559313.92 E 1.193 7123.87
12795.79 89.750 37.300 4066.96 4139.26 6171.33N 6203.69 W 6006033.72 N 559341.01 E 1,202 7154.83
12845.70 89.750 37.250 4067.18 4139.48 6211.04 N 6173.46 W 6006073,70 N 559370.89 E 0.100 7188.70
12891.87 88.700 37.260 4067.80 4140.10 6247,79 N 6145,51 W 6006110.69 N 559398.51 E 2274 7220.03
12941.66 86.600 37.070 4069.85 4142.15 6287.43 N 6115.46 W 6006150.60 N 559428.21 E 4.235 7253.85
12987.02 87.710 37.160 4072.10 4144.40 6323,56 N 6088.13 W 6006186.96 N 559455.23 E 2.455 7284.68
13036.96 87.840 37.470 4074.04 4146.34 6363.25 N 6057,88 W 6006226.91 N 559485.13 E 0.673 7318.51
13083.60 87.650 37.450 4075.87 4148.17 6400.24 N 6029.53 W 6006264,15 N 559513.15 E 0.410 7350.02
13134.23 89.380 38.450 4077.18 4149.48 6440.15 N 5998.41 W 6006304.34 N 559543.92 E 3.946 7383.92
13179.14 94.580 38.630 4075.63 4147.93 6475.24 N 5970.45 W 6006339.67 N 559571.57 E 11.586 7413.63
_.._------_.._,-~_...._._~-~._.,,-,..,._--_.., ..._--_._,.~-----
16 September, 2003 - 7:15 Page 3 of5 DrillQuest 3.03.02.005
BP EXPLORA nON (ALASKA) INC.
Milne Point Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
13229.94 94.320 38.860 4071.69 4143.99
13275.67 94.080 38.430 4068.34 4140.64
13326.60 93.710 38.650 4064.88 4137.18
13372.26 92.780 37.850 4062.30 4134.60
13386.37 92.960 38.390 4061.59 4133.89
13454.00 92.960 38.390 4058.10 4130.40
Sperry-SuntJI!JllilJf~$erv;ces
Survey Report for Milne 'Point MPS - MPS-34L2
Your Ref: API 500292317161
Job No. AKZZ0002600988, Surveyed: 28 August, 2003
BPXA
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (0/100ft)
6514.74 N 5938.75 W 6006379.45 N 559602.92 E 0.682 7447.02
6550.36 N 5910.27 W 6006415.32 N 559631.08 E 1.075 7477.16
6590.11 N 5878.61 W 6006455.34 N 559662.39 E 0.845 7510.80
6625.91 N 5850.39 W 6006491.39 N 559690.30 E 2.685 7541.15
6636.99 N 5841.69 W 6006502.55 N 559698.90 E 4.030 7550.56
6689.93 N 5799.75 W 6006555.85 N 559740.38 E 0.000 7595.41 Projected Survey .
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 350.000° (True).
Magnetic Declination at Surface is 25.412°(11-Aug-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 13454.000.,
The Bottom Hole Displacement is 8853.94ft., in the Direction of 319.077° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
10153.41
10159.00
13454.00
4113.36
4114.55
4130.40
3942.32 N
3947.51 N
6689.93 N
7401.22 W
7402.90 W
5799.75 W
16 September, 2003 - 7:15
,0
Comment
.
Tie On Point
Window Point
Projected Survey
-----.----
Page 4 of5
DrillQuest 3.03.02.005
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
Sperry-Sun Qtlllif!,iServices
Survey Report for Milne PolntMPS .- MPS-34L2
Your Ref: API 600292317161
Job No. AKZZOOO2600988, Surveyed: 28 August, 2003
Survey tool program for MPS-34L2
\....-
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
278.90
0.00 278.90
278.89 13454.00
278.89 Tolerable Gyro (MPS-34)
4130.40 AK-6 BP JFR-AK (MPS-34)
16 September, 2003 - 7:15
Page 5 of 5
BPXA
.
,tJ'
.
---------
DrillQllest 3.03.02.005
e
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
e
Re: Distribution of Survey Data for Well MPS-34 L2 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
10,153.41'MD
10,159.00' MD
13,454.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Survey Manager
Attachment( s)
K~~YY\ ~
603 ~I 1-/L{
16-Sep-03
J
,
Sperry-Sun Drl!'
;g Services
'",-
Milne PöinfUnit
BPXA
Milne Poi"tftAPS
MPS..34L.2<MWD
.
Job No. AKMW0002600988. SUl'ì/eyed: 28 August. 2003
Survey Report
16 September, 2003
Your Ref: AÞI500292317161
Surface Coordinates: 5999917.12 N, 565598.66E (70024'36.7947" H, 1490 27! 57.0634"!A1
Grid Coordinate System: HAD21 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 999917.12 N, 65598.66 E (Grid)
Surface Coordinates relative to Structure: 51.32 S, 746.82 W (True)
Kelly Bushing: 72.3Oft above Mean Sea Level
Elevation relative to Project V Reference: 72.30ft
Elevation relative to Structure: 72.30ft
.
Spl!!!:!r'.....\f-.UI1
OFHLL.tNG SEAVU:eS
A Halliburton Company
Survey Ref: svy1265
Sperry-Suné'lt¡ll¡Ij'll¿~eìvices
Survey Report for Mllnefíof"'.t·"'''S~NlPS.34L2 MWD
Your Ref: APfSQ0292317161
Job No. AKMWOO02600988, SUfl/tiyed: 28 August, 2003
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
10153.41 77.760 342.280 4041.79 4114.09 4024.60 N 7312.94 W 6003877.34 N 558250.66 E 5233.34 Tie On Point
10159.00 77.660 342.220 4042.98 4115.28 4029.80 N 7314.60 W 6003882.52 N 558248.95 E 2.074 5238.75 Window Point
10202.92 82.060 344.160 4050.71 4123.01 4071.18 N 7327.10 W 6003923.79 N 558236.09 E 10.921 5281.66
10235.72 86.480 345.580 4053.98 4126.28 4102.67 N 7335.61 W 6003955.21 N 558227.30 E 14.147 5314.16
\.. 10267.93 87.840 351.610 4055.58 4127.88 4134.19 N 7341.97W 6003986.67 N 558220.66 E 19.168 5346.31
"'-
1 0298.87 87.530 348.380 4056.83 4129.13 4164.64 N 7347.34 W 6004017.06 N 558215.03 E 10.4 79 5377.22 .
10332.72 89.820 352.130 4057.61 4129.91 4197.98 N 7353.07 W 6004050.36 N 558209.01 E 12.977 5411.05
10364.96 90.560 353.080 4057.51 4129.81 4229.95 N 7357.21 W 6004082.29 N 558204.58 E 3.735 5443.26
10395.26 90.370 353.330 4057.26 4129.56 4260.04 N 7360.80 W 6004112.34 N 558200.73 E 1.036 5473.51
10428.33 90.560 353.010 4056.99 4129.29 4292.87 N 7364.73 W 6004145.14 N 558196.51 E 1.125 5506.53
10460.21 89.320 355.840 4057.02 4129.32 4324.60 N 7367.83 W 6004176.84 N 558193.13 E 9.692 5538.31
10490.84 88.640 358.950 4057.57 4129.87 4355.19 N 7369.22 W 6004207.41 N 558191.47 E 10.392 5568.67
10524.20 88.090 2.490 4058.52 4130.82 4388.52 N 7368.80 W 6004240.76 N 558191.60 E 10.735 5601.43
10556.23 87.840 6.230 4059.66 4131.96 4420.44 N 7366.37 W 6004272.69 N 558193.75 E 11.695 5632.44
10586.87 86.970 9.550 4061.05 4133.35 4450.75 N 7362.17 W 6004303.04 N 558197.68 E 11.191 5661.56
10618.98 87.470 11.550 4062.60 4134.90 4482.28 N 7356.30 W 6004334.62 N 558203.28 E 6.413 56.~1.59
10651.91 85.680 15.090 4064.57 4136.87 4514.26 N 7348.73 W 6004366.66 N 558210.57 E 12.029 5721.77
10682.49 88.390 17.670 4066.15 4138.45 4543.55 N 7340.11 W 6004396.03 N 558218.92 E 12.228 5749.12
10732.57 88.950 21.750 4067.32 4139.62 4590.68 N 7323.23 W 6004443.30 N 558235.39 E 8.221 5792.60
10777 .44 88.330 24.020 4068.38 4140.68 4632.00 N 7305.79 W 6004484.77 N 558252.47 E 5.243 5830.27
10827.89 89.880 28.070 4069.17 4141.47 4677.31 N 7283.65 W 6004530.28 N 558274.21 E 8.594 5871.04
10873.86 90.190 31.410 4069.14 4141.44 4717.22 N 7260.84 W 6004570.39 N 558296.66 E 7.297 5906.39
10924.01 91.300 32.800 4068.49 4140.79 4759.70 N 7234.19 W 6004613.09 N 558322.94 E 3.547 5943.59 .
10970.12 91.240 33.400 4067.47 4139.77 4798.31 N 7209.02 W 6004651.93 N 558347.77 E 1.307 5977.25
11019.92 91.110 36.550 4066.45 4138.75 4839.11 N 7180.48 W 6004692.97 N 558375.95 E 6.329 6012.47
11066.08 90.370 37.320 4065.85 4138.15 4876.00 N 7152.75 W 6004730.11 N 558403.36 E 2.313 6043.98
11116.30 87.280 36.280 4066.88 4139.18 4916.20 N 7122.68 W 6004770.57 N 558433.08 E 6.492 6078.35
11161.65 87.400 32.410 4068.99 4141.29 4953.59 N 7097.12W 6004808.19 N 558458.30 E 8.529 6110.74
11210.40 87.280 35.340 4071.25 4143.55 4994.02 N 7069.98 W 6004848.85 N 558485.09 E 6.009 6145.84
11259.01 87.590 40.810 4073.43 4145.73 5032.23 N 7040.05 W 6004887.33 N 558514.69 E 11 .260 6178.27
11309.28 87.660 41.690 4075.51 4147.81 5069.99 N 7006.93 W 6004925.38 N 558547.47 E 1.755 6209.71
11354.54 87.960 41 .310 4077.24 4149.54 5103.87 N 6976.96 W 6004959.51 N 558577.14 E 1.069 623787
11405.17 88.150 40.740 4078.96 4151.26 5142.04 N 6943.75 W 6004997.98 N 558610.02 E 1.186 6269.69
11451.18 88.520 39.920 4080.29 4152.59 5177.10 N 6913.98 W 6005033.30 N 558639.47 E 1.955 6299.05
11501.50 88.950 39.030 4081.41 4153.71 5215.93 N 6882.00 W 6005072.41 N 558671.11 E 1.964 6331.74
--~_._.,-----~---
16 September. 2003 - 7:18 Page 2 0'5 Dri/lQuest 3.03.02.005
,. Sperry-Sun.~,.i~/i.tl"Sèrvices
Survey Report for MllnePoln.fMP.S·MPS.34L2 MWD
Your Ref: API 5Ò0292317161
Job No. AKMWOO02600988, Surveyed: 28 August, 2003
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
11547.12 88.950 38.250 4082.24 4154.54 5251.56 N 6853.52 W 6005108.28 N 558699.28 E 1.709 6361.88
11596.00 89.810 39.610 4082.77 4155.07 5289.58 N 6822.81 W 6005146.57 N 558729.66 E 3.292 6393.99
11642.81 89.880 39.490 4082.90 4155.20 5325.68 N 6793.00 W 6005182.93 N 558759.14 E 0.297 6424.36
11693.69 88.080 38.710 4083.80 4156.10 5365.15 N 6760.92 W 6005222.68 N 558790.88 E 3.855 6457.66
11738.82 88.270 38.630 4085.24 4157.54 5400.37 N 6732.74 W 6005258.15 N 558818.75 E 0.457 6487.45
11790.40 88.330 38.900 4086.77 4159.07 5440.57 N 6700.45 W 6005298.63 N 558850.68 E 0.536 6521.44 .
11835.12 92.470 39.120 4086.46 4158.76 5475.31 N 6672.31 W 6005333.62 N 558878.52 E 9.271 6550.76
11884.94 92.280 38.990 4084.39 4156.69 5513.96 N 6640.95 W 6005372.54 N 558909.54 E 0.462 6583.38
11932.07 92.220 39.630 4082.54 4154.84 5550.40 N 6611.11 W 6005409.24 N 558939.05 E 1.363 6614.09
11981.51 92.720 37.310 4080.41 4152.71 5589.07 N 6580.39 W 6005448.18 N 558969.44 E 4.796 6646.83
12027.59 93.090 37.750 4078.08 4150.38 5625.57 N 6552.35 W 6005484.92 N 558997.15 E 1.247 6677.91
12079.92 93.400 35.180 4075.11 4147.41 5667.58 N 6521.30 W 6005527.21 N 559027.83 E 4.939 6713.89
12124.18 92.410 33.200 4072.87 4145.17 5704.14 N 6496.47 W 6005563.98 N 559052.34 E 4.996 6745.58
12174.32 92.280 33.650 4070.82 4143.12 5745.96 N 6468.87 W 6005606.04 N 559079.57 E 0.933 6781.97
12220.63 92.650 33.330 4068.83 4141.13 5784.54 N 6443.34 W 6005644.85 N 559104.76 E 1.056 6815.54
12271.02 91.300 34.250 4067.09 4139.39 5826.39 N 6415.33W 6005686.94 N 559132.40 E 3.241 6~p1.89
12316.82 90.800 34.930 4066.25 4138.55 5864.09 N 6389.34 W 6005724.87 N 559158.06 E 1.843 6884.50
12366.49 90.000 35.800 4065.90 4138.20 5904.59 N 6360.59 W 6005765.62 N 559186.45 E 2.379 6919.39
12409.62 89.630 38.040 4066.04 4138.34 5939.07 N 6334.68 W 6005800.33 N 559212.06 E 5.264 6948.85
12464.03 89.440 39.090 4066.49 4138.79 5981.61 N 6300.77 W 6005843.16 N 559245.60 E 1.961 6984.86
12508.31 90.370 39.070 4066.56 4138.86 6015.99 N 6272.85 W 6005877.78 N 559273.21 E 2.101 7013.86
12557.81 90.740 39.290 4066.08 4138.38 6054.36 N 6241.58 W 6005916.42 N 5593.04.14 E 0.870 7046.22
12604.15 89.320 38.790 4066.06 4138.36 6090.35 N 6212.40 W 6005952.67 N 559333.01 E 3.249 7076.59 .
12654.22 89.570 38.890 4066.54 4138.84 6129.34 N 6181.00 W 6005991.94 N 559364.07 E 0.538 7109.54
12700.50 89.510 37.370 4066.91 4139.21 6165.75 N 6152.42 W 6006028.59 N 559392.32 E 3.287 7140.43
12750.32 89.440 37.050 4067.37 4139.67 6205.42 N 6122.29 W 6006068.53 N 559422.10 E 0.657 7174.27
12795.79 89.750 37.440 4067.69 4139.99 6241.62 N 6094.78 W 6006104.97 N 559449.30 E 1.096 7205.14
12845.70 89.750 37.260 4067.91 4140.21 6281.29 N 6064.50 W 6006144.91 N 559479.23 E 0.361 7238.96
12891.87 88.700 37.360 4068.53 4140.83 6318.01 N 6036.51 W 6006181.87 N 559506.89 E 2.284 7270.26
12941.66 86.600 37.170 4070.57 4142.87 6357.60 N 6006.39 W 6006221.72 N 559536.66 E 4.235 7304.01
12987.02 87.710 37.350 4072.82 4145.12 6393.66 N 5978.97 W 6006258.02 N 559563.77 E 2.479 7334.76
13036.96 87.840 37.520 4074.76 4147.06 6433.28 N 5948.63 W 6006297.91 N 559593.75 E 0.428 7368.52
13083.60 87.650 37.860 4076.60 4148.90 6470.16 N 5920.14 W 6006335.04 N 559621.92 E 0.835 7399.89
13134.23 89.380 38.830 4077.91 4150.21 6509.85 N 5888.74 W 6006375.00 N 559652.97 E 3.917 7433.52
13179.14 94.580 39.360 4076.36 4148.66 6544.68 N 5860.45 W 6006410.07 N 559680.96 E 11 .639 7462.90
--..-~-----_."--
16 September, 2003 - 7:18 Page 3 of 5 Dri/lQuest 3.03.02.005
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
13229.94 94.320 39.220 4072.42 4144.72
13275.67 94.080 39.160 4069.07 4141.37
13326.60 93.710 39.400 4065.61 4137.91
13372.26 92.780 38.480 4063.02 4135.32
13386.37 92.960 39.040 4062.32 4134.62
13454.00 92.960 39.040 4058.83 4131.13
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-34L2 MWD
Your Ref: API 500292317161
Job No. AKMWOO02600988, Surveyed: 28 August, 2003
BPXA
Local Coordinates Global Coordinates Dogleg Vertical
Northings Eastlngs Northings Eastings Rate Section Comment
(ft) (~) (ft) (ft) ('/100ft)
6583.87 N 5828.37 W 6006449.55 N 559712.68 E 0.581 7495.94
6619.22 N 5799.56 W 6006485.15 N 559741.19 E 0.541 7525.74
6658.55 N 5767.39 W 6006524.76 N 559773.01 E 0.865 7558.89
6694.01 N 5738.74 W 6006560.47 N 559801.35 E 2.863 7588.84
6705.00 N 5729.91 W 6006571.54 N 559810.08 E 4.164 7598.13
6757.46 N 5687.37 W 6006624.37 N 559852.16 E 0.000 7642.40 Projected Survey .
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 350.000' (True).
Magnetic Declination at Surface is 25.412'(11-Aug-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 13454.00ft.,
The Bottom Hole Displacement is 8832.30ft., in the Direction of 319.915' (True).
Comments
.'-"
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
10153.41
10159.00
13454.00
4114.09
4115.28
4131.13
7312.94 W
7314.60 W
5687.37 W
4024.60 N
4029.80 N
6757.46 N
16 September, 2003 - 7:18
Comment
.
Tie On Point
Window Point
Projected Survey
Page 4 of 5
DrillQuest 3.03.02.005
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
Sperry-Sun Drilling ~ervices
Survey Report for MIlne Po/ntMPS ~ .S·34L2 MWD
Your Ref: APlSO02g2317181
Job No. AKMWOO02600.988, surveyed: 28 August, 2003
Survey tool proøram for MPS-34L2 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
278.90
0.00 278.90
278.89 13454.00
278.89 Tolerable Gyro (MPS-34 MWD)
4131.13 MWD Magnetic (MPS-34 MWD)
16 September, 2003 - 7:18
Page 5 0'5
BPXA
.
,.
.
"~----",---..__.~_._--,._-,--
DrillQuest 3.03.02.005
.
.
I~
J
~
ru)
~/
FRANK H. MURKOWSKI, GOVERNOR
AI,ASIiA. ORAND GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Matt Green
Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re: Milne Point Unit MPS-34L2
BP Exploration (Alaska), Inc.
Pennit No: 203-144
Surface Location: 3252' NSL, 412' WEL, Sec. 12, T12N, RlOE, UM
Bottomhole Location: 4582' NSL, 1005' WEL, Sec. 02, T12N, R10E, UM
Dear Mr. Green:
Enclosed is the approved application for pennit to redrill the above development well.
This pennit to redrill does not exempt you from obtaining additional pennits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required pennits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the pennit in the event it was erroneously issued.
The pennit is for a new wellbore segment of existing well MPS S-34, Pennit No 203-130, API
50-029-23171-00. Production should continue to be reported as a function of the original API
number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the tenns and conditions of this pennit may
result in the revocation or suspension of the pennit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~d;lue~ ~
Commissioner
BY ORDER OF THE COMMISSION
DATED thisLî day of August, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
'STATE OF ALASKA _
ALASKA (J .... AND GAS CONSERVATION CO~SION
PERMIT TO DRILL
20 AAC 25.005
11b. Current Well Class 0 Exploratory
o Stratigraphic Test 0 Service
5. Bond: 181 Blanket 0 Single Well
Bond No. 2S100302630-277
6. Proposed Depth:
MD 13387' . TVD 4132'
7. Property Designation:
ADL 380109 ,/
o Drill iii Redrill
1a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3252' NSL, 412' WEL, SEC. 12, T12N, R10E. UM
Top of Productive Horizon:
2397' NSL, 2627' WEL, SEC. 02, T12N, R10E, UM
Total Depth:
4582' NSL, 1005' WEL, SEC. 02, T12N, R10E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: X-565599 y- 5999917 Zone-ASP4
16. Deviated Wells:
Kickoff Depth
10092 ft Maximum Hole Angle
Grade Coupling Length MD TVD MD TVD (includinç¡ staç¡e data)
L-80 BTC 3295' 10092' 4097' 13387' 4132' Uncemented Slotted Liner
Hole
6-1/8"
Casinç¡
4-1/2
Weiç¡ht
12.6#
~Á¡l~
~ '61It{
iii Development Oil 0 Multiple Zone
o Development Gas 0 Single Zone
11. Well Name and Number:
MPS-34L2
12. Field / Pool(s):
Milne Point Unit I Schrader Bluff
8. Land Use Permit:
Milne Point Unit
9. Acres in Property:
2560
13. Approximate Spud Date:
August23,2003
14. Distance to Nearest Property:
2700'
92°
10. KB Elevation Planned 15. Distance to Nearest Well Within Pool
(Height above GL): KBE = 72' feet MPH-07A is 750' away at 10092'
17. Anticipated pressure (see 20 AA9 25.035) .
Max. Downhole Pressure: 1966 psig. Max. Surface Pressure: 1545 psig
PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD
11159' 4322' None NIA J NIA
,:,:,,"-'; ,:,:..,:>,,::.,:.,..:,.-,.,.
Structural
Conductor 75' 20" 260 sx Arctic Set (Approx.) 110' 110'
Surface 5484' 10-3/4" 935 sx PF 'L'. 375 sx Class 'G' 5518' 5446'
Intermediate (Top Job) 54 sx PF 'L'
Production 11104' 7-5/8" 255 sx PF 'E', 434 sx Class 'G' (Approx.) Approx. 11104' 4309'
Liner
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Matt Green Title Drilling Engineer
f!fr()~
Permit To Drill ., // / I API Number:
Number: 2.fX3-/y'-I 50-029-23171-61-00'
Conditions of Approval: Samples Required
Hydrogen Sulfide Measures
Other: -SSOO('s \ tsD \' ~<.". \-
Perforation Depth MD (ft): None
20. Attachments 181 Filing Fee 0 BOP Sketch
o Property Plat 0 Diverter Sketch
Signature
IPerfOration Depth TVD (ft): None
181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report 0 Drilling Fluid Program 18120 AAC 25.050 Requirements
Date:
Contact Matt Green, 564-5581
~ Prepared By Name/Number:
Phone 546-5581 Date \C{ oJ Sondra Stewman, 564-4750
Commission Use Only ,.
16:~~it APProv~~ /IC~ C:7 1 ~t~~~:;~i~~~~~~:
DYes 3No Mud Log ReqUir~~ 0 Ye$~o
DYes .l8,fNo Directional Survey Required fi(les 0 No
Approved Bv: ~0
Form 10-401 Revised 3/2003
~,.4- ""- BY ORDER OF
---.... COMMISSIONER THE COMMISSION
(1 L) I ~ ¡ ~dl\ I .
Date ~7/Ð7
S~i~ln &;cIte
It Milne P&PS-34 Well Permit
IWell Name: I MPS-34 L2
Drill and Complete Plan Summary
I Type of Well (service I producer I injector): I Multi Lateral Producer "NE"
1/
Surface Location:
2028' FNL, (3251' FSL), 412' FEL, (4867' FWL), SEC. 12, T12N, R10E
E=565598.69 N=5999916.85·
2883' FNL, (2397' FSL), 2627' FEL, (2653' FWL), SEC. 2, T12N, R10E
E=558066 N=6004280 Z=4112'TVD
698' FNL, (4582' FSL), 1005' FEL, (4274' FWL), SEC. 2, T12N, R10E
E=559668 N=6006478 Z=4132' TVD
Target Location:
TOP "NE"
Target Location:
BHL "NE" Well TD
I AFE Number: I TBD I Rig: 1 Doyon 14 I
I Estimated Start Date: 123 Aug 2003 I Operating days to complete: 114 1
I MD: 113387 I- I TVD: 14132 I ~ I Max Inc: 192 1 I KOP: 1100921 I KBE: 172 1
I Well Design (conventional, slimhole, etc.): 1 Conventional Grass Roots ML Producer I .
Objective:
Schrader Bluff NE
This lateral was added to the well to replace the OB lateral that was
cancelled when water was encountered in the pilot hole. The NE lateral will
be completed with a hook hanger and the OA lateral will be completed with
a liner top packer.
Mud Program:
6.125-in Production Hole Mud Properties: KCI-CaCOs FloPro
Density (ppg) I PV I YP I HTHP pH API Filtrate
9.0-9.2 10-20 25-30 10-11 9.0-9.5 <6
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR.
MBT
<7
Evaluation Program:
6.125-in Hole section: /
Open Hole: MWD/GRlRES, ABI/IFRlCASANDRA
Cased Hole: N/A
1
- Milne PO&PS-34 Well Permit
Formation Markers
Formation Tops MOrkb TVDrkb Pore Pressure Estimated EMW
(ft) (ft) (psi) (Ib/gal)*
Base Permafrost 2040 1822 8.35
TUZC 8091 3567 1548 8.35
NA 9938 4057 1761 8.35
NB 10014 4077 1770 8.35
NC 10091 4097 1778 8.35
~ NE 10131 4107 1783 8.35
NF 10314 4152 1802 8.35
Top OA 10422 4177 1813 8.35
Base OA 10537 4202 1966 9.0
Top OB 10738 4242 1841 8.35
TO 11104 4309 1870 8.35 ý
* Based on 55 depths
Casinf=/Tubing Program
Hole Size Csg/ Wt/Ft Grade Conn Length Top Bottom
Tbg O.D. MD / TVDrkb MD / TVDrkb
42-in 20-in* 92# H-40 Welded 80' 0' 112' 1 112'
13.5-in 10.75-in 45.5# L-80 BTC-M 5491' 0' 5491 '/2892'
9.875-in 7.625-in 29.7# L-80 BTC-M 111 04' 0' 11104/4309
6.125-in 4.5-in 12.6# L-80 BTC 3295' 10,092/4097 13,387/4132'
NE Slotted J
6.125-in 4.5-in 12.6# L-80 BTC 2701' 10,253/4137 13,376/4202'
OA Slotted
* The 20-in conductors are insulated.
Recommended Bit Program
BHA Hole Size Depth (MD) Bit Type Nozzle/Flow rate
1 13.5-in 0' - 5491 ' Smith MGXi 3-15 & 1-1 0
2 9.875-in 5491'-11104' Smith FGXiCPS 3-15 & 1-1 0
3 6.125-in 10253' - TO Security FM2643 3-12
4 6.125-in 10625' - TO Security FM2643 3-12
2
e
Milne Pc. IIIIPS-34 Well Permit
Well Control:
Surface hole will be drilled with a diverter.
Intermediate hole:
· Maximum anticipated BHP:
· Maximum surface pressure:
Kick tolerance:
· Planned completion fluid:
1,966-psi @ 4,202-ft TVDrkb - Top of "OA" ,/
1 ,545-psi @ surface /
(Based on BHP and a full column of gas from TD @ 0.1-psi/ft)
3,500-psi.
An FIT to 11.5-lb/gal will be made on the 10.75-in casing
shoe.
89-bbl with 9.2-lb/gal mud.
9.7-lb/gal brine / 7.0-lb/gal Diesel (1 ,800-ft MD).
· Planned BOP test pressure:
· Integrity test:
Drilling Hazards & Contingencies:
Hydrates
· Hydrates have not been seen on S pad, but has been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and reduce pump rate
while drilling hydrates; Circulate connections thoroughly. See Well Program and
Recommended Practices for specific information.
· Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
Lost Circulation
../
· We do not expect losses while drilling this well.
· Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
· It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.35 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.1-lb/gal mud. -,.
--
3
e
Milne P"PS-34 Well Permit
Pad Data Sheet
· Please Read the S-Pad Data Sheet thoroughly.
Breathing
· N/A
Hydrocarbons
· Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
· NA
Hydrogen Sulfide
· MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
· MPS-34 has no anti-collision issues.
r
4
e
Milne P&PS-34 Well Permit
DRILL & COMPLETION PROCEDURE
Pre-Rig Operations
1. The 20-in insulated conductor is installed
2. NU diverter
Procedure
1. MI/RU Doyon 14
2. Function test diverter, PU 4.0-in drill pipe
3. Drill 13.5-in surface hole
4. Run and cement 1 O.75-in casing
5. ND diverter, install wellhead, NU BOPE and test
6. Drill 9.875-in intermediate hole
7. Run and cement 7.625-in casing
8. Set whipstock and mill window for OA
9. Drill 6.125-in OA horizontal production hole
10. Run 4.5-in slotted liner
-'/ 11. Run whipstock and mill window for NE lateral ~
12. Drill 6.125-in NE horizontal production hole
13. Retrieve whipstock
14. Run 4.5-in slotted liner and hang off in 7.625-in casing
V 15. Displace drilling mud to brine
16. Run 4.5-in jet pump completion
\ \ 17. N D /N U
-\- N''7 18. Freeze protect well
_ { 19. RD/MO
pCè.f'\1"\..~
5
TREE: Cameron 4-1/16" 5M
WELLHEAD: FMC Gen 5 11 ", 5M
Tubing Head: 11" x 4-1/2",
FMC Tubing Hanger
M.-~¡~f\~~1~~'~~.
I KB. ELEV =66' I
Cellar Box ELEV = 38.5'
9.2 KCL with corrosion
inhibitor as packer fluid
112'
20" 92 Ib/tt, H-40 Welded ;/
Insulated
Diesel Freeze protect to
750' MD
10-3/4" 45.5#, L-80, BTC-M
Casing Drift: 9.875
Casing ID: 9.950
Coupling OD: 11.75"
Burst: 5,210 psi
Collqpse: ::> .480 psi
.
....
..., Pomp '0'''''''' '0 / III
Sliding Sleeve Post rig!
7-5/8" 29.7#, L-80, BTC-M
Casing Drift: 6.75
Casing ID: 6.875
Coupling OD: 11.75"
Burst: 6,890 psi
Collapse: 4,790 psi
.
-----
--------
Window in 7-5/8" casing @ 10,092'
Well Inclination @ Window = 76 deg
... 42" Hole
4-1/2" x 1" Gas Lift Mandrel @ 2,267' MD, 2080' TVD,
RP shear valve open position, "X" Nipple
(2.813" ID) 70' below GLM
4-1/2", 12.6 Ib/ft, L-80, IBT-M
Coupling 00: 5.2"
OriftllO: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7,500, 80%=6,000 psi
"..... 110-314" @ 5,518'MD; 2,894' TVD
BIW 1- Wire
Phoenix Pressure Gauge (3.850" ID, W/BIW 1- wire down
to lower sensor)
Halliburtion Dura Sleeve XD W/X Nipple (3.813" 10)
Phoenix Pressure Gauge (2.840" 10)
7-5/8" x 4-1/2" Premier Packer ISet @ 7630'MD, 4274' TVD I
3-1/2" HES 'XN' nipple 2.750" 10 No Go W/RHC-M for ball
& rod
Wireline Entry Guide
\
\~
/10,092' I
13,387'
Multi-Lateral Junction
......
--
- - --
NE Horizontal 6-1/8" hole
~~- - -
4-1/2" Slotted LinerW/lloCi!-wa
Top liner @ 10,575' MD-
,
~
Window in 7-5/8" casing @ 10,253'
Well Inclination @ Window = 79 deg
7-5/8" PBTD @ 11,020' MD
7-5/8" Casing Shoe @ 11,104' MD
Well Inclination @ Shoe = 79 Degrees
þ~///ML
. ¡Z-VA1?Wh-.
PB1
DATE
12/19/02
REV. BY
SKC
COMMENTS
Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion
- - --
9-7/8" Hole
~~
Multi-Lateral Junction 1 10,253' 1
6-1/8" OA Lateral TO 113,376' 1
-
- - --
- -
OA Horizontal 6-1/8" hole
L1
- -
- - _.-
- -
4-1/2" Slotted Liner W/liner hanger
Milne Point Unit
WF : MPS-34 PB1. 1 & 2
API #: 50-029-23171-70. 50-029-
23171-60 & 50-029-23171-61
COMPANY DETAILS
BP Amoco
REFERENCE INFORMA nON
Co-ordinate (NÆ) Reference: Well Centre: Plan MPS-34, Tme North
Vertical (1VD) Reference: S-Pad Dev 72.00
Section (VS) Relèrence: User Defined (3895.72N,-736329E)
Measured Depth Reference: S-Pad Dev 72.00
Calculation Method: Minirnwn Curvature
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Trav Cylinder North
Error Surface: Elliptical + Casing
Warninp; Method: Rules Based
o
~ ....
'§
, #',§>
,.,. #
~ s§>
~
6'000
èoO
ÕOOO
$000
aOa~OOO ~4'
<'000 0 /'
/000
¿§i' '/000
"
c
:§
o
o
:!.
..c
Õ.
Ö
"N
'J':
~
2
f- 4400
Start Dir 12/100': 10092' MD, 4097.04'TVD
EndDir : 10219.11'MD,4112.95'TVD
Start Dir 11/100': 10394.24' MD, 41 1 1.75'TVD
Start Dir9/100': 10650.03' MD, 4112'TVD
End Dir : 11003.47' MD, 4116.09' TVD
I, II '- I
;..~
1;,;1,.: ; :
,. .1Ih I Inn' I i¡I" '~~' \U. :':'1 ;...": \ ) I
¡ lid I>II! II-I·,t. ::oY \11), 11::1 -, I 'J \ d
I .
11'1':
,j
I":' ',', \1"
I :.: )1: I':.;.~:·.' \;,). :',:9: 1'1 ': \0
"NJ'r \.)
:-':.. ~ I)¡
o
400
800
1200
1600
Vertical Section at 28.73" [400ft/in]
2800
SURVEY PROORAM
Depth Fm Depth To SurveylPlan
10092,00 13386.75 Plarmed: MPS.34 NE wp01 VI
I
Date: 7/23/2003
Plan: MPS-34 NE wpOl (Plan MPS-34/Plan MPS-34 NE)
Tool
MWD+IFR+MS
Created By: Ken Allen
Checked:
Dale
Rcviewed:
Dale
WELL DETAILS
N_ +N/-S +EI-W Northing Basting Latitude Longitude Slot
Plan MPS-34 -54.52 -746.89 5999916.85 565598.69 70024'36.792N 149°27'57,{l63W NlA
TARGET DETAILS
N_ TVD +N/-S +EI-W Northing &.tmg Shape
MPS-34 NE T4 4092.00 5733.25 -6529.21 6005592.00 559020.00 Point
MPS-34 NE T2 4112.00 4429.56 -7494.79 6004280.00 558066.00 Point
MPS-34 NE T3 4122.00 5084.94 -7072.98 6004939.00 558482.00 Point
MPS-34 NE T5 4132.00 6613.61 -5873.40 6006478.00 559668.00 Point
SECTION DETAILS
Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target
I 10092.00 75.18 338.81 4097.04 3895.72 -7363.29 0.00 0.00 7802.28
2 10112.00 77.58 338.81 4101.75 3913.84 -7370.31 12.00 0.00 7820.49
3 10219.11 90.39 339.88 4112.95 4013.31 -7407.80 12.00 4.80 7919.76
4 10394.24 90.39 339.88 4111.75 4177.74 -7468.05 0.00 0.00 8082.71
5 10650.03 89.50 8.00 4112.00 4429.56 -7494.79 11.00 91.79 8288.75 MPS-34 NE T2
6 11003.47 89.21 39.81 4116.09 4748.52 -7353.42 9.00 90.70 8433.37 e
7 11421.13 89.21 39.81 4121.86 5069.33 -7086.04 0.00 0.00 8495.69
8 11441.48 90.00 40.00 4122.00 5084.94 -7072.98 4.00 13.51 8498.70 MPS-34 NE T3
9 11496.53 92.20 40.08 4120.94 5127.08 -7037.57 4.00 2.19 8506.69
10 12212.46 92.20 40.08 4093.45 5674.43 -6576.92 0.00 0.00 8610.07
11 12288.22 90.00 38.00 4092.00 5733.25 -6529.21 4.00 -136.54 8622.37 MPS-34 NE T4
12 12351.73 87.85 36.64 4093.19 5783.74 -6490.72 4.00 -147.78 8634.56
13 13386.75 87.85 36.64 4132.00 6613.61 -5873.40 0.00 0.00 8845.15 MPS-34 NE T5
FORMATION TOP DETAILS
No. TVDPath MDPath Fonnation
4097.00 10091.83 SBE4-NC
4107.00 10140.20 SBE2-NE
CASING DETAILS
No. TVD
MD Name
Size
All TVD depths are
ssTVD plus 72'forRKBE.
4132.00
13386.74 41/2"
4.500
e
:':;11::,
Total Depth: 13386.75' MD,4132' TVD
~ I
)/'. "..""",,,:{
';;""'f' ~\
!
\::'·S-.:( I Plar. \: :~- '¡ ~ (). \:
MPS-34 NE wpOI
41/2"
2000
I . I I
3200
2400
Plan: MPS-34 NE wpOl (plan MPS-34/Plan MPS-34 NE)
Created By: Ken Allen
Checked:
Reviewed:
Date:
Date:
SURVEY PROGRAM
Depth Fm Depth To SurveylPlan To,
10092.00 13386.75 Planned: MPS-34 NE wpOl VI MWD+IFR+MS
-
WELL DETAn.s
N= +NI-" +EI-W Northing Easting Latitude Longitude Slot
Plan MPS-34 -54.52 -746.89 5999916.85 565598.69 70024'36.792N 149"27'57.063W NiA
TARGET DETAILS
""'" TVD +Ni-S +EI·W Northing Easting Shape
MPS-34 NE T4 4092.00 5733.25 -6529.21 6005592.00 559020.00 Point
MPS-34 NE 1'2 4112.00 4429.56 -7494.79 6004280.00 558066.00 Point
MPS-34 NE D 4122.00 5084.94 -7072.98 6004939.00 558482.00 Point
MPS-34 NE T5 4132.00 6613.61 -5873.40 6006478.00 559668.00 Point
SECTION DETAILS
See MD Ine Azi TVD +N/-S +E/-W DLeg TFaee VSee Target
I 10092.00 75.18 338.81 4097.04 3895.72 -7363.29 0.00 0.00 0.00
2 10112.00 77.58 338.81 4101.75 3913.84 -7370.31 12.00 0.00 12.52
3 10219.11 90.39 339.88 4112.95 4013.31 -7407.80 12.00 4.80 81.72
4 10394.24 90.39 339.88 4111.75 4177.74 -7468.05 0.00 0.00 196.95
5 10650.03 89.50 8.00 4112.00 4429.56 -7494.79 11.00 91.79 404.91 MPS-34 NE T2
6 11003.47 89.21 39.81 4116.09 4748.52 -7353.42 9.00 90.70 752.56 e
7 11421.13 89.21 39.81 4121.86 5069.33 -7086.04 0.00 0.00 1162.40
8 11441.48 90.00 40.00 4122.00 5084.94 -7072.98 4.00 13.51 1182.37 MPS-34 NE T3
9 11496.53 92.20 40.08 4120.94 5127.08 -7037.57 4.00 2.19 1236.33
10 12212.46 92.20 40.08 4093.45 5674.43 -6576.92 0.00 0.00 1937.74
11 12288.22 90.00 38.00 4092.00 5733.25 -6529.21 4.00 -136.54 2012.25 MPS-34 NE T4
12 12351.73 87.85 36.64 4093.19 5783.74 -6490.72 4.00 -147.78 2075.03
13 13386.75 87.85 36.64 4132.00 6613.61 -5873.40 0.00 0.00 3099.47 MPS-34 NE T5
,/
3386.75' MD, 4132' T\
REFERENCE INFORMATION
Co-ordinatc (NÆ) Reference: Well Centre; Plan MPS-34, True North
Vertical (TVD) Reference: S-Pad Dev 72.00
Section (VS) Reference: User Defined (3895.72N.-736329E)
Measured Depth Reference: S-Pad Dev 72.00
Calculation Method: Minimum Curvature
FORMATION TOP DETAILS
No. TVDPath MDPath Formation
1 4097.00 10091.83 SBE4-NC
2 4107.00 10140.20 SBE2-NE
CASING DETAILS
No. TVD MD Name Size
I 4132.00 3386.74 41/2" 4.500
"
COMPANY DETAILS
BP Amooo
Calculation Method: Minimum Curvature
~~::': ~=~ ~;v~~~nderNorth
Error Surface: ElJiplica1 + Casing
Waminl/: Method: Ru1esBased
I
['
i
. h"
t
...............\IJ~],l.~L.I~....'.../. \lrS·.1J 'L"
.,¡'J!:..-....----.-.....,.
. '\ --
, .
L.. -)":1
J
/1
/i
/ 1
: 1-/ i
I -'
>.......-..........-- . '
. -...........-....
. / ¡
'., ,..!
.;. I':, - !
,_~ I ,,,I V;r 1 L"
:">!.III.1 OU'
."'gOI
All TVD depths are
ssTVD plus 72'for RKBE.
r
I
I
i
i
I
1
!
;\
6600---
e
,
~
6"t.òo
~o
't.òo
~ ' --Jf""
/t.òo /'
.# '/~
o
dP
I
,¡P
;JP
I
~4'
/ "
, #' #'
, #' #
;-:
v
4õ'TVD.
, I '
-5400
.¡'
';'1;',1.
:
'.
Y \fI).
:24', \1
I
-bUUU
I
I
I
I V I
'b'l \'1)
--
j
West(-)Æast(+) [600ft/in]
¡H'
.~
1
\1lJ.~:~
I.: .;. \11>
;
\[)
\fl'~-
I
\.
*N7.0..::
\.
I>
l
i
: \fI'.~:;.;,
: ./
:L' /
0....." ~..~.."'..
= I ...-........ .
, ........"'..."..;"
;.
\1 I'.. 4S)-{:-' I : .......' Ln.:!).." :' :
~:.:¡---- ,~:,.',-, ; ~:"'~,;;
r-----.. I..'" \lI'S ..
...... ? . ,-
/. ....[;:41>".·< .
. ' .
: .1-
~.- - r \1I'S·
~I I'll
1)9'
.\
'1~'
l'
4
\11>.
~
'.
\1
\-11>.
(llI"l'
~.' \1
4
\,1
.'
.;4 \1
I
I'
;
Iih:,,1
I
¡I
¡
:t-......."........;._.~
I S..~n PII' II :ii
'. i
~, i
'. I";;d Ik o:!'_
\'
'" I
"'I.:~:
).
....~......._._"
6000- _.
i
I
I
: !
5400- -:-1
... !
i
i
¡
,-.
L-'
ì
I
I
i
!
t
;
-7M
"
:§
o
o
~
+'
:E'
t:
~
..c:
"
o
'"
e
BP
KW A Planning Report
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Milne Point
MPt S Pad
Plan MPS-34
Plan MPS-34 NE
Date: 7/23/2003 Time: 16:18:36 Page:
Co-ordinate(NE) Reference: Well: Plan MPS-34, True North
Vertical (TVD) Reference: S-Pad Dev 72.0 .
Section (VS) Reference: User (3895.72N,-7363.29E,28.73Azi)
Survey Calculation Mcthod: Minimum Curvature Db:Öracle
......._-~-~
!
Field: Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: M pt S Pad
Site Position:
From: Map
Position Uncertainty:
Ground Level:
5999978.00 ft
566345.00 ft
Northing:
Easting:
Latitude: 70 24
Longitude: 149 27
North Reference:
Grid Convergence:
0.00 ft
0.00 ft
Well:
Plan MPS-34
Slot Name:
Well Position: +N/-S -54.52 ft Northing: 5999916.85 ft
+E/-W -746.89 ft Easting: 565598.69 ft
Position Uncertainty: 0.00 ft
Latitude:
Longitude:
Well path: Plan MPS-34 NE
Drilled From:
Tie-on Depth:
72.00 ft Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
-7363.29
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
S-Pad Dev
7/23/2003
57538 nT
Depth From (TVD)
ft
7802.28
+N/-S
ft
3895.72
Height
Plan: MPS-34 NE wp01
Date Composed:
Version:
Tied-to:
Principal: Yes
Casing Points
e
Alaska, Zone 4
Well Centre
bggm2003
37.329 N
35.171 W
True
0.51 deg
70 24 36.792 N
149 27 57.063 W
Plan MPS-34PB1
10092.00 ft
Mean Sea Level
25.26 deg
80.84 deg
Direction
deg
28.73
7/23/2003
1
From: Definitive Path
MD TVD Diameter Hole Size Name
ft ft in in -1
13386.74 4132.00 4.500 6.125 41/2"
Formations
MD TVD Formations Lithology Dip Angle . . Dip Direction
ft ft deg deg
10091.83 4097.00 SBE4-NC 0.00 0.00
10140.20 4107.00 SBE2-NE 0.00 0.00
Targets
__u ..._h....._.__.________.....___.... ------ "·'-'-'1
Map Map <-- Latitude·--> <- Longitude -> .
Name Description TVD +N/-S +EI-W Northing Easting Deg Min Sec Deg Min Sec
Dip. Dir. ft ft ft ft ft
---......-...... .~-_.
MPS-34 NE T4 4092.00 5733.25 -6529.21 6005592.00 559020.00 70 25 33.149 N 149 31 8.583 W
MPS-34 NE Poly 4107.00 4482.16 -7221.29 6004335.00 558339.00 70 25 20.839 N 149 31 28.849 W
-Polygon 1 4107.00 4482.16 -7221.29 6004335.00 558339.00 70 25 20.839 N 149 31 28.849 W
-Polygon 2 4107.00 6652.77 -5549.01 6006520.00 559992.00 70 25 42.201 N 149 30 39.851 W
-Polygon 3 4107.00 6972.97 -5908.24 6006837.00 559630.00 70 2545.347 N 149 30 50.397 W
-Polygon 4 4107.00 4487.33 -7809.33 6004335.00 557751.00 70 25 20.884 N 149 31 46.095 W
-Polygon 5 4107.00 3475.70 -7411.16 6003327.00 558158.00 70 25 10.939 N 149 31 34.388 W
-Polygon 6 4107.00 3585.03 -6878.13 6003441.00 558690.00 70 25 12.019 N 149 31 18.760 W
MPS-34 NE T2 4112.00 4429.56 -7494.79 6004280.00 558066.00 70 25 20.319 N 149 31 36.868 W
MPS-34 NE T3 4122.00 5084.94 -7072.98 6004939.00 558482.00 70 25 26.769 N 149 31 24.516 W
MPS-34 NE T5 4132.00 6613.61 -5873.40 6006478.00 559668.00 70 2541.813 N 149 30 49.367 W
Company:
Field:
Site:
Well:
Wellpatb:
-...----...-........
Targets
:-O;ume
BP Amoco
Milne Point
MPtSPad
Plan MPS-34
Plan MPS-34 NE
Plan Section Information
MD
ft
10092.00
10112.00
10219.11
10394.24
10650.03
11003.47
11421.13
11441.48
11496.53
12212.46
12288.22
12351.73
13386.75
Survey
MD
L__ ft
10091.83
10092.00
10100.00
10112.00
10125.00
10140.20
10150.00
10175.00
10200.00
10219.11
10300.00
10394.24
10400.00
10450.00
10500.00
10550.00
10600.00
10650.03
10700.00
10750.00
10800.00
10850.00
10900.00
10950.00
11003.47
11100.00
11200.00
11300.00
11400.00
11421.13
11441.48
11496.53
11500.00
Incl
deg
75.18
77.58
90.39
90.39
89.50
89.21
89.21
90.00
92.20
92.20
90.00
87.85
87.85
Inel
deg
75.18
75.18
76.14
77.58
79.14 .
80.95
82.13
85.12
88.11
90.39
90.39
90.39
90.37
90.20
90.02
89.85
89.67
89.50
89.45
89.40
89.35
89.31
89.27
89.24
89.21
89.21
89.21
89.21
89.21
89.21
90.00
92.20
92.20
1)I!seriptiun
Uip. I>ir.
Adm
deg
338.81
338.81
339.88
339.88
8.00
39.81
39.81
40.00
40.08
40.08
38.00
36.64
36.64
Azim
deg
338.80
338.81
338.81
338.81
338.94
339.10
339.20
339.44
339.69
339.88
339.88
339.88
340.51
346.01
351.50
357.00
2.50
8.00
12.50
17.00
21.50
26.00
30.50
35.00
39.81
39.81
39.81
39.81
39.81
39.81
40.00
40.08
40.08
e
TVU
ft
TVD
ft
---..-.- ..--.--
4097.04
4101.75
4112.95
4111.75
4112.00
4116.09
4121.86
4122.00
4120.94
4093.45
4092.00
4093.19
4132.00
TVD
ft
4097.00
4097.04
4099.02
4101.75
4104.37
4107.00
4108.44
4111.22
4112.70
4112.95
4112.40
4111.75
4111.71
4111.47
4111.37
4111.43
4111.64
4112.00
4112.46
4112.96
4113.51
4114.09
4114.71
4115.36
4116.09
4117.42
4118.80
4120.19
4121.57
4121.86
4122.00
4120.94
4120.81
BP
KW A Planning Report
; :-o;/-s
ft
+N/-S
ft
3895.72
3913.84
4013.31
4177.74
4429.56
4748.52
5069.33
5084.94
5127.08
5674.43
5733.25
5783.74
6613.61
Sys TVD
ft
4025.00
4025.04
4027.02
4029.75
4032.37
4035.00
4036.44
4039.22
4040.70
4040.95
4040.40
4039.75
4039.71
4039.47
4039.37
4039.43
4039.64
4040.00
4040.46
4040.96
4041.51
4042.09
4042.71
4043.36
4044.09
4045.42
4046.80
4048.19
4049.57
4049.86
4050.00
4048.94
4048.81
e
-.....----...,--.--
Date: 7/23/2003... Time: 16:18:36 Page: 2
Co-OI'dinate(NE) Reference: Well: Plan MPS-34, True North
Vertical (TVD) Reference: S-Pad Dev 72.0
Section (VS) Reference: User (3895.72N,-7363.29E.28.73Azi)
Survey Calculation Method: Minimum Curvature·,.Db: Oracle
......................--.-.......
+I(/-W
ft
+E/-W
ft
-7363.29
-7370.31
-7407.80
-7468.05
-7494.79
-7353.42
-7086.04
-7072.98
-7037.57
-6576.92
-6529.21
-6490.72
-5873.40
'hip
'urlhin~
n
'111p
Eustin~
ft
..---.-j
<---- I.atitude ---> <-- I.un~itude -->
I>c!: "lin See l>e2 "lin Sec
DLS Build Turn TFO
deg/100ft deg/100ft deg/100ft deg
._.._.__._.._....._ _n._ ~...~. . .___.__. _ Mh_.__.___.__.....___...__
0.00 0.00 0.00 0.00
12.00 12.00 0.00 0.00
12.00 11.96 0.99 4.80
0.00 0.00 0.00 0.00
11.00 -0.35 10.99 91.79
9.00 -0.08 9.00 90.70
0.00 0.00 0.00 0.00
4.00 3.89 0.93 13.51
4.00 4.00 0.15 2.19
0.00 0.00 0.00 0.00
4.00 -2.90 -2.75 -136.54
4.00 -3.38 -2.13 -147.78
0.00 0.00 0.00 0.00
MapN
ft
6003747.23
6003747.38
6003754.59
6003765.44
6003777.28
6003791.21
6003800.23
6003823.40
6003846.70
6003864.57
6003940.26
6004028.45
6004033.85
6004081.58
6004130.51
6004180.19
6004230.16
6004280.00
6004329.22
6004377.67
6004425.00
6004470.92
6004515.15
6004557.42
6004600.16
6004674.84
6004752.20
6004829.56
6004906.92
6004923.27
6004939.00
6004981.44
6004984.11
MapE VS
ft ft
_uo..___..·.
558202.24 -0.10
558202.17 0.00
558199.31 4.99
558194.99 12.52
558190.30 20.73
558184.82
558181.29
558172.31
558163.40
558156.63
558128.14
558094.95
558092.95
558078.13
558067.96
558062.52
558061.86
558066.00
558074.45
558086.75
558102.81
558122.54
558145.80
558172.47
558204.55
558265.69
558329.03
558392.36
558455.70
558469.08
558482.00
558517.03
558519.24
30.41
36.69
52.85
69.17
81.72
134.94
196.95
200.76
235.81
274.11
315.31
359.04
404.91
452.28
500.79
550.09
599.88
649.86
699.72
752.56
847.28
945.41
1043.54
1141.66
1162.40
1182.37
1236.33
1239.73
DLS
deg/1000
0.00
4.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
0.00
0.00
11.00
11.00
11.00
11.00
11.00
11.00
9.00
9.00
4.00
4.00
0.00
Target. .
MPS-34 NE T2
MPS-34 NE T3
MPS-34 NE T4
MPS-34 NE T5
TFO
deg
.--.--.----.---."
0.00
83.85
0.00
0.00
4.80
0.00
0.00
91.79
91.80
91.82
91.83
91.83
91.80
90.70
90.65
9.00
9.00
9.00
9.00
9.00
0.00
0.00
0.00
0.00
0.00
90.61
90.56
90.51
90.45
90.39
0.00
0.00
0.00
0.00
0.00
Too
SBE4-NC
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
4.77
4.74
4.73
4.70
4.69
MPS-34 NE Po y
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MPS-34 NE T2
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
13.51 MPS-34 NE T3
2.19 MWD+IFR+MS
0.00 MWD+IFR+MS
e BP e
KW A Planning Report
CompallY: BP Amoco Uatt': 7/23/2003 Time: 16:18:36 I'age: 3
Field: Milne Point Co-ol"dillatt'C' E) I{t'rel"ellce: Well: Plan MPS-34, True North
Sile: M pt S Pad Vt'rtical (TV I» I{derellce: S-Pad Dev 72.0
\\'ell: Plan MPS-34 Section (VS) I{ert'renct': User (3895.72N,-7363.29E,28.73Azi)
\\-ellpath: Plan MPS-34 NE Surve~' Calcuhllioll :\'It'thod: Minimum Curvature Ub: Oracle
Survey
\11) IlIeI ,\:r.irn TV\) S~s "1"\1) :\lllp:"i :\Iapl': VS )LS TFO Too!
fI deg deg ft ft ft ft ft deg/100ft deg
11600.00 92.20 40.08 4116.97 4044.97 6005061.11 558582.90 1337.70 0.00 0.00 MWD+IFR+MS
11700.00 92.20 40.08 4113.13 4041.13 6005138.12 558646.56 1435.67 0.00 0.00 MWD+IFR+MS
11800.00 92.20 40.08 4109.29 4037.29 6005215.13 558710.23 1533.64 0.00 0.00 MWD+IFR+MS
11900.00 92.20 40.08 4105.45 4033.45 6005292.14 558773.89 1631.61 0.00 0.00 MWD+IFR+MS
12000.00 92.20 40.08 4101.61 4029.61 6005369.15 558837.56 1729.58 0.00 0.00 MWD+IFR+MS
12100.00 92.20 40.08 4097.77 4025.77 6005446.16 558901.22 1827.55 0.00 0.00 MWD+IFR+MS
12200.00 92.20 40.08 4093.93 4021.93 6005523.17 558964.88 1925.53 0.00 0.00 MWD+IFR+MS
12212.46 92.20 40.08 4093.45 4021 .45 6005532.76 558972.82 1937.74 0.00 0.00 MWD+IFR+MS
12288.22 90.00 38.00 4092.00 4020.00 6005592.00 559020.00 2012.25 4.00 223.46 MPS-34 NE T 4
12300.00 89.60 37.75 4092.04 4020.04 6005601.36 559027.15 2023.88 4.00 212.22 MWD+IFR+MS
12351.73 87.85 36.64 4093.19 4021.19 6005642.82 559058.04 2075.03 4.00 212.22 MWD+IFR+MS
12400.00 87.85 36.64 4095.00 4023.00 6005681.77 559086.49 2122.80 0.00 180.00 MWD+IFR+MS
12500.00 87.85 36.64 4098.75 4026.75 6005762.46 559145.42 2221.78 0.00 180.00 MWD+IFR+MS
12600.00 87.85 36.64 4102.50 4030.50 6005843.15 559204.35 2320.76 0.00 180.00 MWD+IFR+MS
12700.00 87.85 36.64 4106.25 4034.25 6005923.84 559263.29 2419.74 0.00 180.00 MWD+IFR+MS
12800.00 87.85 36.64 4110.00 4038.00 6006004.54 559322.22 2518.72 0.00 180.00 MWD+IFR+MS
12900.00 87.85 36.64 4113.75 4041.75 6006085.23 559381.15 2617.69 0.00 180.00 MWD+IFR+MS
13000.00 87.85 36.64 4117.50 4045.50 6006165.92 559440.08 2716.67 0.00 180.00 MWD+IFR+MS
13100.00 87.85 36.64 4121.25 4049.25 6006246.61 559499.01 2815.65 0.00 180.00 MWD+IFR+MS
13200.00 87.85 36.64 4125.00 4053.00 6006327.30 559557.94 2914.63 0.00 180.00 MWD+IFR+MS
13300.00 87.85 36.64 4128.75 4056.75 6006407.99 559616.87 3013.61 0.00 180.00 MWD+IFR+MS
13386.75 87.85 36.64 4132.00 4060.00 6006478.00 559668.00 3099.47 0.00 180.00 MPS-34 NE T5
BP EXPLORATION
Casing Report - Planning Data for CONDUCTOR 1
Legal Well Name: MPS-34
Common Well Name: MPS-34
Event Name: ORIG DRILLING
Report #:
Start:
End:
1
8/10/2003
General Information
...-. - -.- -.-
_"..___.__. _n_ _'._ .__._..'_"___~"_ ...___. _....___ ..___ ___ _" __ _
Page 1 of 1
Spud Date: 8/11/2003
Report Date: 8/11/2003
Date Landed: 8/11/2003
.--' ---- .--' -.-' .-" .-.
.____·..__·.w_·.·__··_..··_... "___ ._".__ ..._..._....___ __" ._.... __...._.... _._....._ .__ _.. "_""._._. _.... ._.... -.... ---.. ---"" ..-" ..-..... .--' .--....----.. ..--.
.--...--....---...-....-..--...-.-.-....-
String Type: CONDUCTOR 1
Hole TVD: 110.0 (ft)
Ground Level: (ft)
Circ Hours: (hr)
Permanent Datum:
KB-Datum:
CF Elevation:
Mud Lost:
0.00 (ft)
0.00 (ft)
(bbl)
Hole Size:
Water TMD:
Liner Overlap:
KB to Cutoff:
13.500 (in)
(ft)
(ft)
34.68 (ft)
Casing Flange 1 Wellhead
_....._..._.._._ ..__ .'_ .._...__.._.,.._._.__n. _ .._....._.,..___...___.__....._.. .__" ____._.._._..._" .__. .__ .._. n__""...__ ....__.._,_...._
Hole TMD:
Str Wt on Slips:
Max Hole Angle:
Days From Spud:
112.0 (ft)
(lb)
n
0.67 (days)
e
._ n_ __".._'''_'_' .._..,_."__ .__ ._..___" ._" .__ ._, .___. _,' ._" ..__ ._ ..___.___ .-. .--- .---.
._- ---_. -..-.-. ,_. .-- -- -- .--...-- .--- -- .-,....-.. --...-"'--- .-. --.
Manufacturer: FMC
Hanger Model: Landing Ring
Model:
Packoff Model:
Actual TMD Set: 110.00 (ft)
_,._..._ ..._....._...._._. __...._. n_ _.._. _._..___._.__._.. .._. .._
...-...._.._-'.
..._ ..._.....__...._ u_. ___ ___ .'_. ,.___ u_. ._.__ ._.__
Integral Casing Detail
----- -. -..---..-.-..--'-.".- ··-·--'-·---···--r--··--·--- _._.__.._.~..._-- ---..- ·-'1-- -- ---,..- .---.--,-:;.....:=1
Item I· Size !. Weight : Grade Drift \ Threads JTS: Length ; Top ¡THO
, (in) 'I (Ib/ft) I (in) ; I (ft) I (ft) 'I I
CASING JOINTS I 20.000 94.00 H-40 18.93618RST+C 21 75.321 34.68 1
~
J )D'
- .-.-. - .'--
Manufacturer
Top Hub/Flange: (in) I (psi)
BTM Hub/Flange: (in) I (psi)
..- -.. .'--- .--. .---. ..--...-.-. .--. ..-_..._--..
-1 ¿--;;-~d~-r Max OD[ ~ IDr . -- ¿o~p~~,;;-·
I (in) I· (in)
19.124
e
Printed: 8/18/2003 4:50:38 PM
Legal Well Name: MPS-34
Common Well Name: MPS-34
Event Name: ORIG DRILLING
.......----.-............
BP EXPLORATION
Casing Report - Planning Data for SURFACE CASING
......--..
......... ._.____m .._____._.___......
String Type: SURFACE CASING
Hole TVD: 2,895.0 (ft)
Ground Level: (ft)
Circ Hours: 3.00 (hr)
.........---..-
.--...-.---.....
......----.
-....---.--
Manufacturer: FMC
Hanger Model:
Actual TMD Set: 5,518.09 (ft)
Permanent Datum:
KB-Datum:
CF Elevation:
Mud Lost:
.---.
Model:
Packoff Model:
.........---., ........_--.-. ...---
........---
...---]- ......-.--. ....-.--.
Size Weight Grade Drift
(in) ; (Ib/ft) (in)
Item
CASING HANGER
CASING JOINTS
FLOAT COLLAR
CASING JOINTS
FLOAT SHOE
10.750
10.750
10.750
10.750
45.50 L-80
45.50 L-80
...,.......-.---
Accessory
CENTRALIZER
---..-
7 Straight blade centralizers ran on 1 st 7 joints
9.875 BTC
BTC
9.875 BTC
-----.-
HALLIBURTON
Report #:
Start:
End:
2
8/10/2003
....n._._.__·"_
.--..-----...
General Information
........ .-.----...- ...... ....-------......
...---.-..-.....
0.00 (ft)
0.00 (ft)
(bbl)
Hole Size:
Water TMD:
Liner Overlap:
KB to Cutoff:
13.500 (in)
(ft)
(ft)
34.30 (ft)
........-..--.---
Casing Flange 1 Wellhead
.-----
-.------.
.......-.--.--.
Integral Casing Detail
Threads-: J'Ts-~~~~ïh'l ~~f" ¡THO Manufacturer
2.65 34.30 FMC
131 5,397.93 36.95 LONESTAR
1 1.22 5,434.88 HALLIBURTON
2 80.24 5,436.10 LON ESTAR
1 1.75 5,516.34 HALLIBURTON
.__n__ '---..J n. " ¡:-, . ¡--
Non-Integral Casing Accessories.:) J / Ó
--........-.---.--
Manufacturer
Number
..-..----. ...-..-----.---- -.....-..---.-...
Remarks
........____. ....·...·m____..._.......·____
Page 1 of 1
Spud Date: 8/11/2003
Report Date: 8/12/2003
Date Landed: 8/14/2003
..,.-------..
Hole TMD:
Str Wt on Slips:
Max Hole Angle:
Days From Spud:
...........---.-
5,526.0 (ft)
(Ib)
76.00 n
1.67 (days)
e
Top Hub/Flange: 12.000 (in) I (psi)
BTM Hub/Flange: (in) I (psi)
Condo
Max 00 Min ID
(in) (in)
Compo Name
9.950
9.950
e
..... ...-.-.-.--.-
--.-....-..---.--.---.--...
i Interval
7 ¡--ToP (ft) 5,218.~ !__·--··~~tí~~-(ftf,:-9~~-
Printed: 8/18/2003 4:50:27 PM
-
.
BP EXPLORATION
Cementing Report
Page 1 of 3
Legal Well Name: MPS-34
Common Well Name: MPS-34
Event Name: ORIG DRILLING
Report #:
Start:
1
8/10/2003
Spud Date: 8/11/2003
Report Date: 8/11/2003
End:
Cement Job Type: Primary
_.._..._..._¥_...___n.____.__...__..._..,._____..__..__···----··-···-··-····---1-··-···~-_····_····-···-··_··.-----...--r.....-...---..-.-...--..-.....--.-..--...-..,.-
_ _ ___Fdl1}?rl.. __ ______~u~eze Qpe...!!Hol~____ ___~lIeeze~a~n!L__~___ ___E!lIL______
Hole Size: 13.500 (in) Hole Size: Hole Size: Hole Size:
TMD Set: 5,518.0 (ft) SO TMD: (ft) TMD Set: Top Set: (ft)
Date Set: 8/14/2003 SO Date: Date Set: BTM set: (ft)
Csg Type: SURFACE CASING SO Type: Csg Type: Plug Date:
Csg Size: 10.750 (in) SO TMD: Plug Type:
SO Date: Drilled Out:
Cmtd. Csg: OPEN HOLE Cmtd. Csg: Cmtd. Csg: Cmtd. Csg:
Cement Co: HALLIBURTON
_, _.._"_'"._' _, ._. - - ._ _. .__, _.._. _.._n._ ._" _"._ __.._ _ _ __"._" _ _ _
Pipe Movement
__..___..._..___"_. _.."_ ..._._...._._..._.._...__.._..._.__.._..._...___...._...._....._....__ _..._.."_..,__.._.._ ..___.___.___,0._.._..__..._...__...__..._.._
Rot Time Start: :
Rec Time Start:OO:OO
Time End: :
Time End: 00:00
RPM:
SPM:
Init Torque: (ft-Ibf)
Stroke Length: (ft)
Avg Torque: (ft-Ibf)
Drag Up: (lb)
Max Torque: (ft-Ibf)
Drag Down: (lb)
Stage No: 1 of 1 '.
--- .-- -.-.-.--.-- -.-.---.--.-.--..--..-..-.-- - ---.-. - - .-.--.- ---.. - _..~- ---.-".-.-.
Type: PRIMARY CEMENT Start Mix Cmt: 20:30 Disp Avg Rate: 5.00 (bbl/min) Return~ost retuJPS:
Volume Excess %: 250.00 Start Slurry Displ: 20:30 Disp Max Rate: 6.00 (bbl/min) Total Mud Lost: 232.00 (bbl) J
Meas. From: EST. GAUGE HOLE Start Displ: 22:42 Bump Plug: Y Cmt Vol to Surf: (bbl)
Time Circ Prior End Pumping: 01 :00 Press Prior: (ft)
To Cementing: 3.50 End Pump Date: 8/15/2003 Press Bumped: 2,500 (psi)
Mud Circ Rate: 400 (gpm) Top Plug: Y Press Held: 5 (min)
Mud Circ Press: 420 (psi) Bottom Plug: Y Float Held: Y
Ann Flow After: N
Mixing Method: ON-THE-FL Y
Density Meas By: DENSOMETER
-'-"-"-"-"---"'---".-...-.-..- '-.--'-'.'- ._--.~_.._.- ..-...- ._._~.__.._..._._- -.-..-
Mud Data
-...-..-.....-. -.-- -'.-.'-...- -.-.----..- _-'_._"_"_._.._.._._._._.__..'_.__ _...__'_"'_"_"_ _··._···_._··_··____···_._·.__._.·_M_._..
Type: SPUD MUD Density: 9.30 (ppg) Vise: 47 (s/qt)
Bottom Hole Circulating Temperature:55 ("F)
Displacement Fluid Type:OLD MUD
PVIYP: 19 (cp)/8 (lb/100ft2) Gels 10 sec: 3 (lb/100ft2) Gels 10 min: 8 (lb/100ft2)
Bottom Hole Static Temperature: 60 (OF)
Density: 9.30 (ppg) Volume: 284.00 (bbl)
Stage No: 1 Slurry No: 1 of 4
..---..-..-.-..-..-...--...-.-..-..-...-.....-..--...-.-.-....-...--.--..-.. -.--....-...-. --...-..-.....-.--..-...-....- ...-....-.....-..-..-...-....-....--.-...-..-
Slurry Data
Fluid Type: PRE FLUSH
Slurry Interval: (ft) To: (ft)
Water Source: LAKE
Description: SPACER WATER
Cmt Vol: (sk) Density: 8.30 (ppg)
Slurry Vo120.0 (bbl) Water Vol: 20.00 (bbl)
Class: SPACER
Yield: (ft3/sk)
Other Vol: (bbl)
Purpose: SPACER
Mix Water: 100.00 ()
Foam Job: N
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Pressure
(psi)
(psi)
Printed: 8/18/2003 4:51:05 PM
-
--
BP EXPLORATION
Cementing Report
Legal Well Name: MPS-34
Common Well Name: MPS-34
Event Name: ORIG DRILLING
Report #:
Start:
1
8/10/2003
Stage No: 1 Slurry No: 2 of 4
Page 2 of 3
Spud Date: 8/11/2003
Report Date: 8/11/2003
End:
_..._...__..._._.._..._._.._.__..._...._.._._._._.._.._.._...__."__"._. _.,_..__ ,_, ._..,_.._,._..._...__....._..__. ___..._..._m_..__'" _.._...._.._.. _ __" ._.... __,_
Slurry Data
Fluid Type: SPACER
Slurry Interval: (ft) To: (ft)
Water Source: LAKE
Test Data
Thickening Time:
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Description: SPACER WEIGHTED Class: SPACER
Cmt Vol: (sk) Density: 10.20 (ppg) Yield: (ft3/sk)
Slurry Vol:75.0 (bbl) Water Vol: 45.00 (bbl) Other Vol: (bbl)
Temperature: (OF)
Temperature: (OF)
Temperature: CF)
Time
Compressive Strength 1:
Compressive Strength 2:
~-, -.-,.-...--.-..-....--..-,...-...-,..-..---,..-...-..-.'-"..- .-,.-".-....-.-..-
Stage No: 1 Slurry No: 3 of 4
Temp
CF)
(OF)
Purpose: SPACER
Mix Water: 0
Foam Job: N
Pressure
(psi)
(psi)
._"._ ._..._ ._. __._.._ ._" _...___"._.__.._n ___. _"_." _._ __" __" _" _" ._ __._",_,,_ _ ._" __., _ _" .__._ .___ _ _. _'.._
Slurry Data
Fluid Type: CEMENT
Slurry Interval: 134.0 (ft)
Water Source: LAKE
Description: LEAD SLURRY Class: OTHER
To: 4,741.0(ft) CmtVol: 935(sk) Density: 10.70 (ppg) Yield: 4.150 (ft"/sk)
Slurry Vol:691.0 (bbl) Water Vol: 452.00 (bbl) Other Vol: (bbl)
Test Data
Thickening Time: 6.00
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Temperature: (OF)
Temperature: (OF)
Temperature: (OF)
Time
Compressive Strength 1:
Compressive Strength 2:
Temp
(OF)
(OF)
Purpose: FILLER SLUR
Mix Water: 20.30 0
Foam Job: N
Pressure
(psi)
(psi)
"._" _._...__._.__.._. ._"._"__"__'_" _··____n._·_.'·_ __..,"_"_"__ _"._"._" .__...__.__.._..._...__.._..__._..._...._...._..._
Slurry Data
Fluid Type: CEMENT
Slurry Interval: 4,741.0 (ft) To:
Water Source: LAKE
Test Data
Thickening Time: 3.40
Free Water: (%)
Fluid Loss: (cc)
Fluid Loss Pressure: (OF)
Stage No: 1 Slurry No: 4 of 4
Description: TAIL SLURRY Class: G-CLASS
5,518.0 (ft) Cmt Vol: 375 (sk) Density: 15.80 (ppg) Yield: 1.150 (ft3/sk)
Slurry Vol:76.0 (bbl) Water Vol: 47.00 (bbl) Other Vol: (bbl)
Temperature: 70 (OF)
Temperature: (OF)
Temperature: CF)
Time
Compressive Strength 1: 12.00
Compressive Strength 2: 24.00
Temp
70 (OF)
70 CF)
Purpose: FILLER SLUR
Mix Water: 5.00 0
Foam Job: N
Pressure
828 (psi)
1,359 (psi)
-.-'-'.-..--- --..----".- - -. .__._~-- -.-.'-"'- -".-" -'-.-".--.--.-- ---".--,._--_.~
Stage No: 1 Slurry No: 4 of 4 - Additives
;-A=-;-=--=-' Tæ-~·!-!a;~-==~==--~~EL=T~~-+ ~o!!fentæ.tj~.~ % ~ ·~i~._ -(-- Li9UidCon~:..___~._..Q[1its_=.~
Printed: 8/18/2003 4:51 :05 PM
e
e
BP EXPLORATION
Cementing Report
Page 3 of 3
Legal Well Name: MPS-34
Common Well Name: MPS-34
Event Name: ORIG DRILLING
Report #:
Start:
1
8/10/2003
Spud Date: 8/11/2003
Report Date: 8/11/2003
End:
Casing Test
Shoe Test
Liner Top Test
.. 'n__ ..... .__......_. ". _.___._..._......
.--.--....
Test Press: 2,500 (psi)
For: 30 (min)
Cement Found between
Shoe and Collar: Y
Pressure: (ppge)
Tool: N
Open Hole: (ft)
Hrs Before Test:
Liner Lap:
Pos Test: (ppge)
Neg Test: (ppge)
Hrs Before Test:
Cement Found on Tool: N
Tool: N
Tool: N
.....___.__ n...______.."._ ..._..____......
log/Survey Evaluation
Interpretation Summary
...--...... -.------. ---.----..
........-,..-.----
CBL Run: N
Under Pressure: (psi)
Bond Quality:
Cet Run: N
Bond Quality:
Temp Survey: N
Hrs Prior to Log:
Cement Top: (ft)
How Determined:
TOC Sufficient: N
I
Job Rating:
If Unsuccessful Detection Indicator:
Remedial Cementing Required: N
Number of Remedial Squeezes:
Remarks
"_______..n
---".-.. ..---.... ------......
.......---
..._--~
PRIMARY CEMENT JOB LOST RETURNS AFTER DISPLACING 290 BBLS OUT OF TOTAL DISPLACEMENT OF 522 BBLS.
BUMPED PLUG WITH 1000 PSI OVER DISPLACEMENT PRESSURE OF 1500 PSI FOR TOTAL PRESSURE OF 2500 PSI. BLED
OFF PRESSURE CHECKED FLOATS - FLOATS HELD. PUMPING RATE FOR SPACER 7 BBLS PER MIN AT 425 PSI- LEAD
CEMENT 7 BBLS PER MIN AT 300 PSI- TAIL CEMENT 5 BBLS PER MIN AT 700 PSI - DISPLACEMENT 5 BBLS PER MIN AT 1100
TO 1500 PSI SLOWED DOWN TO 3 BBLS PER MIN LAST 25 BBLS AT 1500 PSI TO BUMP PLUG. NO CEMENT TO SURFACE.
PREFORMED TOP JOB - RAN IN 1" CS HYDRILL TUBING TAG UP HARD AT 134' RKB - PUMP 50 BBLS FRESH WATER TO FLUSH
CONDUCTOR - FOLLOWED BY 54 SX TYPE "L" YIELn 4.15 CFISX 2~CF 40 BBLS OF SLURRY MIXED AT 10.5 PPG -10 BBLS OF
10.5 PPG CEMENT TO SURFACf: - LI::F I IN HOLE 30 BBLS OF SLURRY - 40 SXS
Printed: 8/18/2003 4:51:05 PM
e
e
Per Alaska Oil and Gas Conservation Commission Regulation 20 AA 25.005 Permit
to Drill sub section 14 (e) if a well has multiple well branches, each branch requires
a separate Permit to Drill. If multiple well branches are proposed from a single
conductor, surface or production casing, the applicant shall designate one branch as
the primary Well bore and include all information required under (c) of this section
that is unique to that branch and need not include the $100 fee.
--
.
TRANSMJT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME /IJ¡?>t< ,-<)..;3Lj L 2-
20 3 - /Vt/
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
/
(If API number
last two (2) digits
are between 60-69)
"CLUE"
The permit is for a new W. ell_bpre segment of
existing well.!!J.ßl, 5-.3 7' I
Permit No,.2Þ3-/~I No. {;'l>.o 2... ~-2..3( 7 -00
Production should continue to be reported as
a function' of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(t), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (SO
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\jody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
peñorate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing . exception that may
occur.
An dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
--
.
~
o
Well bore seg
Annular Disposal
1J~¡J'''_i~~Field & Pool MILNE POINT, SCHRADER BLFF OIL - 525140 Well Name: MILNE PT UNIT SB S-34L2 Program DEV
PTD#: 2031440 Company BP EXPLORATION (ALASKA) INC Initial ClasslType DEV I PEND GeoArea 890 Unit 11328 OnlOff Shore On
Administration 1 Permit fee attached. - - - - - - - ~ - ~ - - - - - - - - - - - ~ · NA. · . Lateral w~lJb.ore; .fee wajv~d per.20 .AAC25.005(e} - - - - - -
2 .Leas.enumber .appropriate. - - - - - - - - - - - - - - - - - - - - - - · Y~s. - - - - -- - - - - - - - - - - - - - - - - - - - - - - - -
3 Unique wellnam~and Ol!mb.er . . - - - - - - - - - · Y~s. - - - - - - - - - - - -
4 WeJI JQcat~d ina defined pool. - - - - -- .........Y.es. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Well JQcat~d proper .distance. from driJling unit.b.ound.ary. ........ Y~s. - - - - - - - - - - - - - - - -
6 WellJQcat~d proper distançe. from. QtheJ wells - - - - - - -- · y~s - - - - - - - - - - - - - - - - -
7 Sufficient .acn'!ageayailable In.dJilJiog unit . . . . . . . . ........ Y~s. - - - - - - - - - - - - - - - - - - - - - - - - - -
8 Jfd~viated, js. weJI bQre plaUncjuded · y~s - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - -
9 Qperator onl}' affected party. . - - - - -- · y~s.. - - - - - - - - - - - - - - - - - - -
10 .Qperator has appropriate. bond in.force. . . - - - - - - - - · Y~s. - - - - - - - - - - - - - - - -
11 P~rmit can be issued wHI)Qu! ÇQ.nserva.tion order. . · y~s - - - - - - - - - - - - - - - - - - - - - - - - -
Appr Date 12 P~rmit can be issued withQut ad.ministratille.approvaJ . Y~s. - - - - - - - - - - - - - - - - - - - -
SFD 8/19/2003 13 Can permit be apPJov~d before .15-day. wajl. . . . . . . . · y~s. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 WellJocat~d within area and strata .authorized by.iojeçtioo Ord~r # (putiO# in.comm~ots)(For NA . . - - - - - - - - - - - - -
15 AJI wells witt1in.1 [4 milear~a.of (eyiew id~otified (For ~ervic~ weU on I}') . · NA - - - - .. - .. - ~ - - - - -
16 Pre-produced injeçtor; duraüonof pre-produc;tion I~ss than. 3 months. (For service well. Qnly) . . NA - - - - - .. - - - - - - - - .. - - - .. -
17 ACMP finding.of Con$i$tençy.h.as been i~sued for. this pr.oiect NA · . Lateral.w~lJb.ore dJilledJrom. e.xisting.pad. - - - .. .. .. ..
Engineering 18 C.ooduçtor string.PJQÝidßd . - - .. .. - - - -.. - - - - · NA.. · Conduçtor jn.staJled. iO MPS,3~. . . . . . . .. - - .. -
19 Surfaceca~ing.PJotec;ts alLknown. USQWs . - - - - - .. - - · NA · .';11. aquif~rs ex~mpt~d ~O CFB j4 7..1.02(b )(3)
20 CMT voL adeQu.ate.to circ.uLate.on .cond.uctor & SUJf.CSg . . . - - - - - - - · NA · . Surface ça$ing installed in MPS-34 . .
21 .CMT vol adeQuate.to tie-inJQng .string to.sur:f çsg. . . . . . . . . . · NA. · Prodl!ctioncasiog installed in MeS-34 . .. - .. -
22 CMTwill çoyer.aJl kOQwnpro.duçtiye hQri;1:ons. - - - - - .. - - .. .. - - · No · . Slot!edJioer .completion plaoned..
23 Casiog de.signs adeQua.te for C,.T" B .&permafrosl. . . . - - - - - - ...... Yes. - - - .. - .. .. -
24 .Ädequate.tankage.oJ re.serye pit. . . . . . . - - - - - .. - - - · y~s . . . Big ise~uippe.dwittl ~tßelpits.No.reseJ\lepjtpla[1!)ed, All wa~te to.c.las~ II w~lJ(s)
25 Jfare-drilt tlas.a 10-403 fQr abandonment be~o apPJQvßd . - - - - .. - - · NA - - - .. - - - - - - - - - .. - - - - - - - .. - -
26 Adequate wellbor~ ~eparation propo~ed. . . . . - - - - - - .. .. .. - · y~s · Proximit}' analysis perfo(med, No .close app(oach issues identified. with.this latera]..
27 Jf.diverter Jequired, dQe~ itmeetreguJa.tions. . · NA.. - - - - - - - - - - .. - - - .. - - .. - - - - - - - - .. - - - - - - -
Appr Date 28 DriUiog fluid pJogram sc;hematic& equip Jisl.adequat~. . . . . . . · Y~s · . Expeçted SHe 8.35 EMW, PJanoed.mud wejghts9,Q -9..2 ppgwith 9..1 expected.
TEM 8/19/2003 29 BOPEs, dO Jhey meßtreguJation . . . - - - - - .. .. - . . . .Y~s. - - -- - - - .. - - - - - - - - - - - .. .. -
~ll' 30 BOPEwess ratiog appropriate; .test to (puJ psig in .comments). . . - - - .. .. .. - · Y~s. CalçuJatedMASP. 15~5 psi. Plann.ed ßOP .test 3500 psi, - - - - .. .. .. .. - -
31 .Chokemanifold compJie~ w/APIRF'-53 (May 84). . . . . . . . . - .. .. - - - - · Y~s. - - - - - - - - - .. - - - - - - - - - - - - .. .. - - .. .. -
32 WQrJç will oÇCur withoul.operationsbutdown. . . . . - - .. .. - - · Y~s. - - - - - - - - - - - - - - - .. -
33 J~ pre~ençe Qf H2S gas. prQb.able. . . . . . . . . . . - - .. - - .. · NA - - - - - - - - - - - .. .. .. - - -
34 MechanicaLcoodjtion of w~lIs within ';OB yerified (for.s.ervicß w~1I on!}'). NA - - - - - .. - - - - - - - - - - ~ - - - - - - - - - - - - - - - - - -
Geology 35 P~rmitca[1 be tssued w/o hydrogen.s.ulfide measures. . . . . . . . . . . . . . . . . . . . . . . . . .Y~s . - - - - - - - - - - - - - - - - - - - - - - - - ~
36 D.ata.pJeseoted on. p,ote.ntial ove.rpres.surß .ZOnes. . . . . . .Y~s. . . . Expeçted reservoir pre$SUJe i~8,35 ppg EMW; will be drHlßd with 9.0 ~ 9.2 ppg.mud,
Appr Date 37 S.etsmic.analysjs Qf shaJlow gaszooes. . . . . . . . . . . . . . . · NA
- - - - ~ - - - - - - - - . . .
SFD 8/19/2003 138 S~abedCQnditioo survey (if off-shore} . . . . . . . . . . . .. NA
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
39 CQntact name[p]1one.forweßlsly progress.rep,orts [exploratory .ooly] . . . . . . . . . . . NA - - - - - - - -
Geologic Date: Engineering Public Multilateral oil-producer in Schrader Bluff NE sand - SFD
Commissioner Commissioner: Date Commissioner,--..., . Date
¡? ~ ~j~~
~
J:J
e
e
Well History File
APPENDIX
Information of detailed nature that is not
particularly gennane to the Well Pennitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infonnation, information of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of infonnation.
Sperry-Sun Dr~ng Services
LIS sca~ility
.
(~3-144
1 J.) eM
'"
..
$Revision: 3 $
LisLib $Revision: 4 $
Mon Oct 13 15:21:34 2003
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/10/13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/10/13
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name. . . . . . . . . . . . . . . .UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-34 L2
500292317161
B.P. Exploration (Alaska) Inc.
Sperry-Sun Drilling Services
13 -OCT- 03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
MW0002600988
T. MCGUIRE
E. VAUGHN
MWD RUN 2
MW0002600988
R. FRENCH
C. DIXON
MWD RUN 3
MW0002600988
R. FRENCH
L. BROWN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 6
MW0002600988
T MCGUIRE
C. DIXON
MWD RUN 7
MW0002600988
T. MCGUIRE
E. VAUGHN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3252
412
MSL 0)
72.30
38.00
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
, . ... .... .. ... C
-~~Z,,:~~~·~ n \~
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
BIT S.(IN)
13 .500
9.875
6.125
SIZE (IN)
20.000
10.750
7.625
DEPTH (FT)
112.0
5518.0
10159.0
.
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED. THESE
DEPTHS ARE BIT DEPTHS.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) ,
UTILIZING GEIGER-MUELLER TUBE DETECTORS.
4. MWD RUNS 2 & 3 COMPRISED DIRECTIONAL WITH DGR AND
ELECTROMAGNETIC
WAVE RESISTIVITY PHASE-4 (EWR4).
5. THE PURPOSE OF MWD RUN 6 WAS TO POSITION THE
WHIPSTOCK AND MILL THE
WINDOW. THE TOP OF THE WINDOW WAS AT
10159'MD/4114'TVD, AND THE BOTTOM
AT 10171'MD/4117'TVD. NEW FORMATION WAS DRILLED TO
10184'MD/4119'TVD.
SROP DATA ONLY ARE PRESENTED FOR THIS RUN.
6. MWD RUN 7 COMPRISED DIRECTIONAL WITH DGR AND EWR4.
7. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 9/5/2003. MWD DATA
ARE CONSIDERED
PDC.
8. MWD RUNS I, 2, 3, 6, 7 REPRESENT WELL MPS-34 L2 WITH
API#: 50-029-
23171-61. THIS WELL REACHED A TOTAL DEPTH (TD) OF
13454'MD/4130'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME (DEEP
RESISTIVITY) .
SLIDE = NON-ROTATED INTERVALS, REFLECTING BIT DEPTHS
$
File Header
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
1 .
.
and clipped curves; all bit runs merged.
.5000
START DEPTH
69.5
113.5
5505.5
5505.5
5505.5
5505.5
5505.5
STOP DEPTH
13399.0
13454.0
13406.0
13406.0
13406.0
13406.0
13406.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
3
6
7
MERGED MAIN PASS.
$
MERGE TOP
69.5
5526.0
8846.0
10159.5
10184.0
MERGE BASE
5526.0
8846.0
10159.0
10184.0
13454.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type... ..0
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 69.5 13454 6761.75 26770 69.5 13454
ROP MWD FT/H 0.7 5544.73 293.048 26682 113.5 13454
GR MWD API 9.01 126.39 68.3469 26660 69.5 13399
RPX MWD OHMM 0.18 945.4 11.4807 15802 5505.5 13406
RPS MWD OHMM 0.25 999.8 11.6409 15802 5505.5 13406
RPM MWD OHMM 0.17 2000 12.819 15802 5505.5 13406
RPD MWD OHMM 0.2 2000 15.0433 15802 5505.5 13406
FET MWD HOUR 0.05 219.74 0.768139 15802 5505.5 13406
.
.
First Reading For Entire File......... .69.5
Last Reading For Entire File.......... .13454
File Trailer
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type.. . . . . . . . . . . . . . .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type.......... . . . . . .LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
69.5
113.5
STOP DEPTH
5481.0
5526.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
13 -AUG- 03
Insite
66.37
Memory
5526.0
112.0
5526.0
.0
77.2
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
TOOL NUMBER
155790
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13.500
112.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
Spud Mud
9.10
MUD VISCOSITY (S): 4IÞ
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
198.0
9.0
450
14.0
4IÞ
.000
.000
.000
.000
.0
78.8
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Service Order
Units
FT
FT/H
API
Size
4
4
4
Nsam
1
1
1
Code
Offset
o
4
8
Channel
1
2
3
Name
DEPT
ROP
GR
MWD010
MWD010
Rep
68
68
68
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 69.5 5526 2797.75 10914 69.5 5526
ROP MWD010 FT/H 3.9 5544.73 276.28 10826 113.5 5526
GR MWD010 API 9.01 112.18 60.8705 10824 69.5 5481
First Reading For Entire File......... .69.5
Last Reading For Entire File.......... .5526
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... ~10/13
Maximum Physical Record. ~35
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
3
.
header data for each bit run in separate files.
2
.5000
START DEPTH
5481.5
5505.5
5505.5
5505.5
5505.5
5505.5
5526.5
STOP DEPTH
8808.5
8801.0
8801.0
8801.0
8801.0
8801.0
8846.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
16-AUG-03
Insite
66.37
Memory
8846.0
5526.0
8846.0
71.9
77.0
TOOL NUMBER
126027
151812
9.875
5518.0
LSND
9.40
57.0
8.8
300
5.8
3.200
2.410
5.250
4.500
67.0
91.3
67.0
67.0
REMARKS:
.
.
#
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5481. 5 8846 7163.75 6730 5481. 5 8846
ROP MWD020 FT/H 0.7 1452.54 417.726 6640 5526.5 8846
GR MWD020 API 15.84 126.39 74.5854 6655 5481.5 8808.5
RPX MWD020 OHMM 1. 72 57.84 9.16637 6592 5505.5 8801
RPS MWD020 OHMM 0.25 54.19 9.08132 6592 5505.5 8801
RPM MWD020 OHMM 0.17 2000 10.6593 6592 5505.5 8801
RPD MWD020 OHMM 0.2 2000 13.0508 6592 5505.5 8801
FET MWD020 HOUR 0.05 56.07 0.707524 6592 5505.5 8801
First Reading For Entire File......... .5481.5
Last Reading For Entire File.......... .8846
File Trailer
Service name......... ... .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type........... . . . . .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
.
4
.
header data for each bit run in separate files.
3
.5000
START DEPTH
8801.5
8801.5
8801.5
8801.5
8801.5
8809.0
8846.5
STOP DEPTH
10159.0
10159.0
10159.0
10159.0
10159.0
10159.0
10159.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
18-AUG-03
Insite
66.37
Memory
10159.0
8846.0
10159.0
71.8
80.1
TOOL NUMBER
126027
151812
9.875
5518.0
LSND
9.55
61. 0
8.2
300
5.0
2.500
1.650
4.100
3.500
65.0
102.3
65.0
65.0
·'
Logging Direction. . . . . . .. . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing................... ..60 .1IN
Max frames per record........... ..Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 8801.5 10159 9480.25 2716 8801.5 10159
ROP MWD030 FT/H 3.99 1111.6 272.059 2626 8846.5 10159
GR MWD030 API 19.2 114 . 84 65.5112 2701 8809 10159
RPX MWD030 OHMM 2.35 755.04 18.3334 2716 8801.5 10159
RPS MWD030 OHMM 2.35 248.53 15.6118 2716 8801.5 10159
RPM MWD030 OHMM 2.34 1816.22 17 . 766 2716 8801.5 10159
RPD MWD030 OHMM 2.41 2000 21.1047 2716 8801.5 10159
FET MWD030 HOUR 0.07 14.64 0.923582 2716 8801.5 10159
First Reading For Entire File......... .8801.5
Last Reading For Entire File.......... .10159
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
5
header data for each bit run in separate files.
6
.5000
. .
VENDOR TOOL CODE
ROP
$
START eH
10159.5
STOP DEPTH
10184.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing................... ..60 .1IN
Max frames per record........... ..Undefined
Absent value.................... ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD060
.
26-AUG-03
Insite
66.37
Memory
10184.0
10159.0
10184.0
76.7
77.8
TOOL NUMBER
6.750
10159.0
Flopro
9.50
52.0
9.0
51000
3.6
.000
.000
.000
.000
.0
84.2
.0
.0
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
. ,
. .st Last
Name Service Unit Min Max Mean Nsam ading Reading
DEPT FT 10159.5 10184 10171. 8 50 10159.5 10184
ROP MWD060 FT/H 3.11 268.78 37.3842 50 10159.5 10184
First Reading For Entire File......... .10159.5
Last Reading For Entire File.......... .10184
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type.............. . .LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name..... ..STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
GR
FET
ROP
$
6
header data for each bit run in separate files.
7
.5000
START DEPTH
10159.5
10159.5
10159.5
10159.5
10159.5
10159.5
10184.5
STOP DEPTH
13406.0
13406.0
13406.0
13406.0
13399.0
13406.0
13454.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
28-AUG-03
Insite
66.37
Memory
13454.0
10184.0
13454.0
77.7
93.7
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
TOOL NUMBER
160796
. ,
EWR4
$
Ele~mag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
148574
.
6.125
10159.0
FloPro
9.50
55.0
9.0
49000
4.2
.120
.080
.100
.160
65.0
99.7
65.0
65.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10159.5 13454 11806.8 6590 10159.5 13454
ROP MWD070 FT/H 10.09 487.94 204.603 6540 10184.5 13454
GR MWD070 API 36.17 108.83 75.6103 6480 10159.5 13399
RPX MWD070 OHMM 0.18 945.4 10.9639 6494 10159.5 13406
RPS MWD070 OHMM 0.32 999.8 12.5784 6494 10159.5 13406
RPM MWD070 OHMM 0.32 944.58 12.9424 6494 10159.5 13406
RPD MWD070 OHMM 1.17 2000 14.5308 6494 10159.5 13406
FET MWD070 HOUR 0.18 219.74 0.764658 6494 10159.5 13406
First Reading For Entire File......... .10159.5
..
Last Reading For Entire Fil~....... .13454
.
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/10/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.007
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/10/13
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/10/13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name...... .... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File