Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-169
.. -
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
d.. a '3 - -l be¡ Well History File Identifier
D Two-sided 1111111111111111111
Organizing (done)
D Rescan Needed 11111111I1111111111
Rji'CAN
~ Color Items:
D Greyscale Items:
DIGITAL DATA
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
D Diskettes, No.
D Other, NolType:
D Poor Quality Originals:
OVERSIZED (Non-Scannable)
D Other:
D Logs of various kinds:
NOTES:
Date J :J-¡I,+/OÇ
D Other::
BY:
G;J
Isl
mf
1111111111111111111
"V\I\f
Project Proofing
BY:
r ~aria ~
Date ~~¡ I Lf loS
'3 X 30 = ClO + r7 = TOTAL PAGES 01 .
. I. II / (Count does not include cover s~le IIlA P
Date: I d-. J 4- ()~Ç Isl r f t
1111111111111111111
Isl
BY:
~
Scanning Preparation
Production Scanning
Stage 1 Page Count from Scanned File: q ~ (Count does include cover sheet)
Page Count Matches Number in Scannin¡¡ pre~aration: v---- YES
BY: ~ Date: J e--l J if lOb
Stage 1 If NO in stage 1, page(s) discrepancies were found:
Isl
NO
vvtP
YES
NO
BY:
Maria
Date:
Isl
1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
Isl
Comments about this file:
Quality Checked
1111111111111111111
10/6/2005 Well History File Cover Page.doc
• •
,.--~
-°=~ --
MICROFILMED
03101/2008
DO NOT PLACE
~~~...
ANY NEW MATERIAL
UNDER THIS PAGE
F:1LaserFiche\C~rPgs_Inserts~Microfilm_Marker. doc
."lRECEIVED
~1 ,,_. .... STATE OF ALASKA ..
;-1 ¡- EB ,0 j\~KA OIL AND GAS CONSERVATION COM.SION
Alaska Oil & ~b~ON OR RECOMPLETION REPORT AN~ .LOG
RevIsion" Status Change to Abandoned
Anr.horaae
1 a. Well Status: DOil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class:
20MC 25.105 20MC25.110 181 Development D Exploratory
DGINJ DWINJ D WDSPL No. of Completions One Other D Stratigraphic D Service
2. Operator Name: 5. Date Comp., Susp., or A~il~ 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 11/2/2005 203-169 - 305-344 r
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 10/16/2003 50- 029-23141-61-00 '
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 10/18/2003 MPS-01 L2 -
3375' NSL, 4714' WEL, SEC. 07, T12N, R11 E, UM 8. KB Elevation (ft): 15. Field I Pool(s):
Top of Productive Horizon:
1420' NSL, 239' WEL, SEC. 06, T12N, R11 E, UM KBE = 71.90' Milne Point Unit I Schrader Bluff
-
Total Depth: 9. Plug Back Depth (MD+ TVD)
4509' NSL, 767' WEL, SEC. 06, T12N, R11E, UM 7200 + 4072 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 566077 y- 6000045 Zone- ASP4 11075 + 4243 Ft ADL380110
TPI: x- 570509 y- 6003410 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 569940 y- 6006494 Zone- ASP4 N/A MD
DYes 181 No 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey N/A MSL 1800' (Approx.)
21. Logs Run:
MWD , GR , RES, ABI , PWD , IFR/CASANDRA
22. CASING, LINER AND CEMENTING ReCORD
··.··.·iCÀSIN(';; $ET11NG DEPTH MD SeTTING DEPTH WD HOLE J >. .......>. :.... ...
. SIZE Wr. PER F-r.. GrooE Top BOTTOM Top BdrroM SiZE·.·. ,.; '\i ... 1·.·Pti2L~b
....
20" 92# H-40 34' 112' 34' 112' 42" 260 sx Arctic Set (Approx.)
10-3/4" 45.5# L-80 35' 3140' 35' 2375' 13-112" 946 sx PF 'L' 275 sx Class 'G'
7-5/8" 29.7# L-80 33' 74R7' 33' 4222' 9-718" 160 sx PF 'E' 293 sx Class 'G'
4-112" 12.6# L-80 7482' 11045' 4219' 4243' 6-1/8" Uncemented Slotted Liner
23. Perforations open to Production (MD + TVD of Top and 124. ..... ........ ..' ···L.>;·<> ....\>..
..... >\ \ ...
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
None None
MD TVD MD TVD
25. A ",-. ". ..... ." ·;.i< ..ii;/"·;'..»<
SCANNED MAR 2 .2 2007 "V'Uf' . >';
DePTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Set Cement Retainer with 25 Bbls Class 'G",
Squeezed 20 Bbls 'G' below and 5 Bbls 'G' on top
Freeze Protected with 111 Bbls of Diesel.
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ~
Flow Tubing Casing Pressure CALCULATED OIL -BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE'"
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheaLif nece.~
Submit core chips; if none, state "none". -=¡o'_. \
None R8DMS SFt MAR ,2 2 2DD" ~~.J12~_ [
I '. ~:~~
--.....-- i
Form 10-407 Revised 12/2003
·R:..'....... I C.".'.. N· '1 tNTINUED ON ReVERSE SIDE
,qV I A
k,(~
.~)? ~·I' .Þ')
;¿:-'~þ( <S
28.
GEOLOGIC MARKER
NAME
MD
TVD
TUZC
MA
MB1
MB2
MB2-1
MC
SBF2-NA
SBF21
SBF24-MF
SBF1-NB
SBF1-NBR
SBF12
SBE4-NC
SBE41
SBE2-NE
6344'
6906'
6955'
7061'
7217'
7298'
7358'
7362'
7403'
7408'
7423'
7448'
7458'
7470'
7488'
3694'
3924'
3948'
4000'
4080'
4123'
4155'
4157'
4179'
4181'
4189'
4202'
4207'
4213'
4223'
30. List of Attachments: Wellbore Schematic
29.
RMA TION TESTS
Include and briefly mmarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
None
Signed Sondr
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Date
Title Technical Assistant
MPS-01 L2
Well Number
203-169 305-344
Permit No. I A roval No.
Prepared By NameINumber:
Drilling Engineer:
Sondra Stewman, 564-4750
Adrienne McVey, 564-4184
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval),
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None",
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
~ 4-1/16"-5M FMC .
Wellhead' 11" x 4.5" 5M Ge
wI 4.5" TCII T&B Tubing Hanger
4" CIW "H" BPV profile
20" x 34" insulated, 215 #/ft A-53 ~
Orig. KB elev. = 72.50' (Doyon 14)
or.. elev.= 38.30' (Doyon 14)
MPS-01
103/4" 45.5 ppf L-80 BTRC
(Drift ID = 9.794, cap, = .0961 bpf)
103/4" Super Seal II Float Shoe I 3140' I
7 5/8" 29.7 ppf, L-80, BTRC-mod production casing
(drift ID = 6.750", cap. = 0.0459 bpf)
Kill string @ 3,650'
4,5", 12,6#, L-80 IBT tbg,
(cap, = .0152 bpf, id =3.958)
KOP @ 400'
53+ degree from 1950'
Max hole angle = 68 degree @ 5060'
58 degree @ Sleeve
11II(
Top of Cement @ 7091'
Cement retainer set @ 7200'
( 5 bbls of cement on top)
Window in 7-5/8" Casing @ 7487' - 7
Well Angle @ window = 60°
Baker Hook Wall
Hanger inside 7-5/8" Window 7482'
Baker Hook Wall
Hanger outside 7-5/8" Window 7499'
Baker Tie Back Sleeve 7662'
Baker Hook Wall
Hanger inside 7-5/8" Window 7671'
Baker Hook Wall
Hanger outside 7-5/8" Window 7697'
HES 3.5" XN-Nipple (2.750" No-Go)
5-1/2" Mule shoe I 7,595' I
542'
7,5 '
7,556'
7,578'
Window in 75/8" Casing @ 7685' - 7697'
Well Angle @ window = 73°
OA Lateral
66 jts. - 4 1/2" R3 Slotted Liner
12,6# L-80 IBT (7,747'-10,199')
Rat Hole
287'
7-5/8" Halliburton Float Collar 8054'
7-5/8" Halliburton Float Shoe 8139'
61/8" Hole td @ 10,530'/ Btm Baker41/2" Guide Shoe 10,243'
Baker Tie Back Sleeve 7885'
Baker ZXP Liner Top Packer 7,892'
Baker 7-5/8" x 5" HMC Liner Hanger 7,898'
61/8" Hole td @ 10,515' / Btm Baker41/2""V" Float Shoe
10,514'
60 jts. - 4 1/2", 12.6# L-80, IBT
OB Lower Lateral Slotted Liner (8,117'-10,512')
DATE
04/16/03
10/21/03
713/06
REV. BY
MDO
MOO
KDC
COMMENTS
Drilled & Completed Doyon 14
NE Lateral & Completed Doyon 14
ADD CEMENT ABOVE RETAINER
MILNE POINT UNIT
WELL 8-01
API NO: 50-029-23141-60 L2
API NO: 50-029-23141-60 L 1
API NO: 50-029-23141-00
BP EXPLORATION (AK)
.
Page 1 of 2
.
Stewman, Sandra D
From: McVey, Adrienne
Sent: Tuesday, January 02,200710:12 AM
To: Stewman, Sondra D
Subject: FW: Sundry approval requirements for MPS-01A
Sondra,
Here's the final word from Tom Maunder on the S-01A permitting requirements. When you have a moment, could
you let me know what information we need for the 407's? I've never had to submit one before.
-Adrienne
From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us]
Sent: Wednesday, December 27,20067:39 AM
To: McVey, Adrienne
Cc: Steve Davies; Steve McMains; Dave Roby
Subject: Re: Sundry approval requirements for MPS-OIA
Adrienne,
We agree with what you propose. Submit 407's for the abandonment of the laterals and a sundry to re-
enter the mainbore and prepare it for sidetrack.
Call or message with any questions.
Tom Maunder, PE
AOGCC
Thomas Maunder wrote, On 12/22/20067:56 AM:
Adrienne,
Good questions. I will check with my colleagues over here. I tend to agree with
considering the laterals abandoned and filing one sundry to re-enter. I will get back to you.
Tom Maunder, PE
AOGCC
McVey, Adrienne wrote, On 12/22/20067:44 AM:
Tom,
I'm the engineer for an upcoming Milne Point sidetrack, S-01 A, currently set to spud on
January 24. I have a question regarding the required sundry approval(s). The original
well, S-01, was a tri-Iateral. We attempted a rig workover on the well last October,
which went very badly, and we ended up suspending the well; the lower two laterals
are isolated by a packer assembly with a plug in the tailpipe, and we isolated the upper
lateral by setting an EZSV retainer in the main wellbore and pumping cement below
and above. We filed a separate sundry for each lateral (305-342, 305-343, and 305-
344), but the Type of Request for all 3 was marked as Suspend. It seems to me that
the sundry for the main wellbore (305-342) should have indicated we'd suspended the
well, and the other 2 should have been classified as abandonments. So, my question
is: for re-entering the main wellbore and doing a cut-and pull sidetrack below the
surface shoe (which will not affect the isolation below), what sundry approvals do we
1/3/2007
.
Page 2 of 2
.
need? Do we need just one for re-entering a suspended well, or do we also have to file
sundries to switch the status of the upper two laterals from suspended to abandoned?
Please Jet me know if you have questions. Thanks!
Adrienne McVey
BP ACT Drilling
907-564-4184 (office)
907-748-9865 (cell)
mcv~_ªl@ bp.cQITl
1/3/2007
.~_. ~_.'''''''~./ -t"'t""'-' ._~ '''''''1'''''''''' ""'..........I.-J ......" "..... >.J \Jl<'"
Adrienne,
We agree with what you propose. Submit 407's for the abandonment of the laterals and a sundry to
re-enter the main bore and prepare it for sidetrack.
Call or message with any questions.
Tom Maunder, PE
AOGCC
Thomas Maunder wrote, On 12/22/20067:56 AM:
~06 - (0lf
Adrienne,
Good questions. I will check with my colleagues over here. I tend to agree with considering the
laterals abandoned and filing one sundry to re-enter. I will get back to you.
Tom Maunder, PE
AOGCC
McVey, Adrienne wrote, On 12/22/20067:44 AivI:
~: !~'
Tom,
I'm the engineer for an upcoming Milne Point sidetrack, S-01A, currently set to spud on January 24.
I have a question regarding the required sundry approval(s). The original well, S-01, was a
tri-Iateral. We attempted a rig workover on the well last October, which went very badly, and we
ended up suspending the well; the lower two laterals are isolated by a packer assembly with a plug
in the tailpipe, and we isolated the upper lateral by setting an EZSV retainer in the main wellbore
and pumping cement below and above. We filed a separate sundry for each lateral (305-342,
305-343, and 305-344), but the Type of Request for all 3 was marked as Suspend. It seems to me
that the sundry for the main wellbore (305-342) should have indicated we'd suspended the well,
and the other 2 should have been classified as abandonments. So, my question is: for re-entering
the main wellbore and doing a cut-and pull sidetrack below the surface shoe (which will not affect
the isolation below), what sundry approvals do we need? Do we need just one for re-entering a
suspended well, or do we also have to file sundries to switch the status of the upper two laterals
from suspended to abandoned? Please let me know if you have questions. Thanks!
Adrienne McVey
BP ACT Drilling
907-564-4184 (office)
907-748-9865 (cell)
mcvea Î @bp.com
of I
[2/27/2006 10:04 AM
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Ceresa Tolley
333 West 7th Avenue, Suite 100
Anchorage, Alaska 9950 I
December 03, 2003
13&/~
I oCr /1
RE: MWD Formation Evaluation Logs: MPS-OI Ll+L2+L2 PBl,
AK-MW-2355592
MPS-Ol Ll+L2+L2 PBl:r{)O ?.:rO .?/5
Digital Log Images: -:¡J03-1 LJ1
50-029-23141-60,61, 71
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petrotechnical Data Center MB33
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date::) ! [) g/ Nr
Signed~lçf;íCfDc ( .~
,~ . ~ (j )
j/
;;v (\fitV' ^~ ~ \-
DATA SUBMITTAL COMPLIANCE REPORT
11/8/2005
5 -ulJ..- t~òct~,
API NO~O-029-23141-61-00
Permit to Drill 2031690
Well Name/No. MILNE PT UNIT SB S-01L2
Operator BP EXPLORATION (ALASKA) INC
MD 11075"'- TVD 4243 ,,- Completion Date 10/21/2003/ Completion Status 1-01L
Current Status 1-01L
UIC N
Mud Log No
r~
Directio~urvey _ Yes
(data taken from Logs Portion of Master Well Data Maint
Interval OH/ .
Start Stop CH Received Comments
7301 11021 Open 4/16/2004 EWR4 GR ASI ROP PWD
9936 11075 12/8/2003
9936 11075 12/8/2003 MWD
7421 10393 12/8/2003 PS1
7421 10393 12/8/2003 PS1 - MWD
0 0 4/16/2004 DSN 12553
9968 10339 Open 4/16/2004 PS1 EWR4 GR ASI ROP
PWD
0 0 4/16/2004 DSN 12554
REQUIRED INFORMATION
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, ASI, PWD, IFRlCASANDRA
Well Log Information:
Log/
Data Digital
Type..,..--Med/Frmt
œ6 D Lis
~
~t
j1tPt
£P6t
~ Lis
~
Electr
Dataset
Number Name
12553 Induction/Resistivity
Directional Survey
Directional Survey
Directional Survey
Directional Survey
LIS Verification
12554 Induction/Resistivity
Log Log
Scale Media
Run
No
Well Cores/Samples Information:
LIS Verification
Name
Interval
Start Stop
Sample
Set
Number Comments
.
Sent
Received
ADDITIONAL INFORMATION
Well Cored? Y ~
Chips Received? -y! tJ
Analysis
Received?
Comments:
Daily History Received?
~:
Formation Tops
~
Permit to Drill 2031690
MD 11075
TVD 4243
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
11/8/2005
Well Name/No. MILNE PT UNIT 5B S-01L2
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23141-61-00
~etion Date
Completion Status
10/21/2003
1-01L
Current Status 1-01L UIC N
, '1 ~. "'\ L \r
Date: .? ~.J
.
.
KI::LJtlVt:D
DEe 0 5 2005
I STATE OF ALASKA .
ALASKA AND GAS CONSERVATION COMM ON
WELL COMPLETION OR RECOMPLETION REPORT AND uAlllk, Oíl &. GIS Cons. Commission
Anchorage
1a. Well Status: 0 Oil 0 Gas 0 Plugged 0 Abandoned II Suspended 0 WAG
20AAC 25.105 20AAC 25.110
21. Logs Run:
MWD , GR , RES, ABI , PWD , IFR/CASANDRA
CASING, liNER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTfITVO HOLE
lOP BoTTOM lOP BoiTOM SIZE
34' 112' 34' 112' 42"
35' 3140' 35' 2375' 13-1/2"
33' 7487' 33' 4222' 9-7/8"
7482' 11045' 4219' 4243' 6-1/8"
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3375' NSL: 4714' WEL, SEC. 07, T12N, R11E, UM /
Top of Productive Horizon:
1420' NSL, 239' WEL, SEC. 06, T12N, R11E, UM
Total Depth:
4509' NSL, 767' WEL, SEC. 06, T12N, R11 E, UM
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 566077 y- 6000045 Zone- ASP4
TPI: x- 570509 y- 6003410 Zone- ASP4
Total Depth: x- 569940 y- 6006494 Zone- ASP4
---~_.~-------------- --------------------- ----------------
18. Directional Survey 0 Yes II No
22.
CASING
SIZE
20"
10-314"
7-5/8"
4-1/2"
Wr. PER Fr.
92#
45.5#
29.7#
12.6#
GRADE
H-40
L-80
L-80
L-80
23. Perforations open to Production (MD + TVD of Top and
Bottom Interval, Size and Number; if none, state "none"):
None
MD
TVD
MD
25.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Set Cement Retainer with 25 Bbls Class 'G",
Squeezed 20 Bbls 'G' below and 5 Bbls 'G' on top
Freeze Protected with 111 Bbls of Diesel.
One Other
5. Date Comp., Susp., or Aband.
11/2/2005
6. Date Spudded
1 0/16/2003
7. Date T.D. Reached
10/18/2003
8. KB Elevation (ft):
KBE == 71.90'
9. Plug Back Depth (MD+ TVD)
7200 + 4072
10. Total Depth (MD+TVD)
11075 + 4243
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/ A MSL
24.
SIZE
None
TVD
1b. Well Class:
II Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit to Drill Number
203-169 / 305-344
13. API Number
50-029-23141-61-00 .;
14. Well Name and Number:
MPS-01L2 .
15. Field I Pool(s):
Milne Point Unit / Schrader Bluff
Ft
Ft
16. Property Designation:
ADL 380110
17. Land Use Permit:
20. Thickness of Permafrost
1800' (Approx.)
AMOUNT
PULLED
260 sx Arctic Set (Approx.)
946 sx PF 'L', 275 sx Class 'G'
160 sx PF 'E', 293 sx Class 'G'
Uncemented Slotted Liner
DEPTH SET (MD)
PACKER SET (MD)
26.
Date First Production:
Not on Production '
Date of Test Hours Tested PRODUCTION FOR
TEST PERIOD +
Flow Tubing Casing Pressure CALCULATED +
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none".
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc.):
N/A
OIL-Bsl GAs-McF WATER-BsL
OIL-Bsl
None '
GAs-McF
WATER-Bsl
CHOKE SIZE I GAS-OIL RATIO
OIL GRAVITy-API (CORR)
RBDMS BFL DEC () 9 2D05
Form 10-407 Revised 12/2003,0 RIG I f~ A~UED ON REVERSE SIDE
28.
...
GEOLOGIC MARKERS
.-.
29.
4RMATION TESTS
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
NAME
MD
TVD
TUZC
MA
MB1
MB2
MB2-1
MC
SBF2-NA
SBF21
SBF24-MF
SBF1-NB
SBF1-NBR
SBF12
SBE4-NC
SBE41
SBE2-NE
6344'
6906'
6955'
7061'
7217'
7298'
7358'
7362'
7403'
7408'
7423'
7448'
7458'
7470'
7488'
3694'
3924'
3948'
4000'
4080'
4123'
4155'
4157'
4179'
4181'
4189'
4202'
4207'
4213'
4223'
None
30. List of Attachments: Summary of Daily Drilling Reports and a Wellbore Schematic
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Title Technical Assistant
Date lZ:.~CB-c;S
MPS-01 L2
Well Number
203-169 305-344
Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
Prepared By NamelNumber:
Drilling Engineer:
Sondra Stewman, 564-4750
John Rose, 564-5271
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
.
.
BP EXPLORATION
Operations Summary Report
Page 10t. 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-01
MPS-01 0/
WORKOVER
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
1 0/15/2005
10/21/2003
14
Spud Date: 3/25/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
10/20/2005 17:00 - 19:00 2.00 MOB P PRE Skid rig floor
19:00 - 20:00 1.00 MOB P PRE Move off MPS-10
20:00 - 22:00 2.00 MOB P PRE Work on rig moving system
22:00 - 23:00 1.00 MOB P PRE Move rig on MPS-1
23:00 - 00:00 1.00 MOB P PRE Skid rig floor and rig up
10/21/2005 00:00 - 04:00 4.00 RIGU P PRE Take on sea water, Rig up to 350 bbl waste circ tank. test lines
to tank, and kill lines, pull BPV, rig Accept @ 0001 10/21/2005
04:00 - 04:30 0.50 RIGU P PRE Pre-spud meeting with crew
04:30 - 07:00 2.50 PULL P DECOMP Circ out with sea water and safe surf-o pills, thru tubing, taking
returns up annulus thru choke to waste tank, 3 bbls min. 400
psi, 150 on annulus, starting pressure on tubing 200 psi,
annulus 200 psi, bleed right off just gas.
07:00 - 08:00 1.00 RIGU P PRE Install TWC and test to 4500 psi, good test
08:00 - 09:00 1.00 RIGU P PRE Nipple down tree
09:00 - 11 :00 2.00 RIGU P PRE Nipple up BOPS
11 :00 - 16:30 5.50 RIGU P PRE Test BOPS and manifold to 250-3000 psi for 5 min. per test,
hydril 250-2500 psi 5 min. per test, the right to witness test was
wavier by John Crisp AOGCC, test was witness by WSL.,
Choke line valve failed
16:30 - 19:30 3.00 RIGU N SFAL PRE PJSM, Replace Choke line HCR valve
19:30 - 20:00 0.50 RIGU P PRE Finish BOP test, Tested HCR valve 250-3000 psi 5 min per
test
20:00 - 21 :00 1.00 RIGU P PRE lay down test equipment, rig up stack tongs, pup 3 ft pup on
Lubricator
21 :00 - 22:00 1.00 RIGU P PRE Pull TWC with lubricator
22:00 - 22:30 0.50 PULL P DECOMP Make up landing jt. pull hanger to floor, P/U wt 105K
22:30 - 23:30 1.00 PULL P DECOMP PJSM, Rig up floor to lay down Tubing, spooling unit, lay down
hanger
23:30 - 00:00 0.50 PULL P DECOMP Laying down 12.6# L-80 IBT Tubing
10/22/2005 00:00 - 08:00 8.00 PULL P DECOMP Laying down 12.6# L-80 IBT Tubing, total 173 jts, 1 GLM,
Phoenix pressure gauge, Sliding sleeve, jet pump and 3.5 cut
jt. (tubing cut @ 7230.12)
08:00 - 08:30 0.50 PULL P DECOMP Clear floor, lay down spooling unit
08:30 - 09:30 1.00 PULL P DECOKAP install test plug, test lower rams 250-3000 psi 5 min. per test,
John Crisp wavier the right to witness test, test witness by WSL
09:30 - 11 :30 2.00 PULL P DECOMP Picking up Milling assem, #1,63/4 mill shoe,2 mill
extension,boot basket,2 junk subs,bit sub,bumper
sub,jars,shear out sub,9-dc,6 hw
11 :30 - 15:00 3.50 PULL P DECOMP Picking up 4" drill pipe out of shed
15:00 - 16:00 1.00 PULL P DECOMP Running drill pipe out of derrick
16:00 - 20:00 4.00 PULL P DECOMP Milling over packer @ 7242', with 127K P/U, 95K SIO, 105K
RT, 70 rpms, 400 gpm, 1080 psi, mill 6" mill not acting right,
20:00 - 22:00 2.00 PULL P DECOMP POHto check mill assm.
22:00 - 23:00 1.00 PULL P DECOMP Stand back BHA, found 2.5" wide and 6" long and a .75 wide 6"
long pieces in junk sub and lots of mill marks on outside of mill
assm. one piece has part or order # on it 10050741, check
clamps that was on tubing (don't match and we had the right
count coming out of hole), call Baker shop and they don't have
any thing with this # on it. we have something in hole with us
above packer, (Clamp, something off phoenix gauge, or sliding
sleeve ????)
23:00 - 00:00 1.00 PULL P DECOMP Picking up BHA #2, same as #1 but with 3 more DC
10/23/2005 00:00 - 00:30 0.50 PULL P DECOMP Picking up BHA #2
Printed: 111712005 9:57:36 AM
-
'--/
BP EXPLORATION
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-01
MPS-01
WORKOVER
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
10/15/2005
10/21/2003
14
Spud Date: 3/25/2003
End:
Date From- To Hours Task Code NPT Phase Description of Operations
10/23/2005 00:30 - 02:00 1.50 PULL P DECOMP Rih to 7050'
02:00 - 03:30 1.50 PULL P DECOMP Slip and cut drilling line, service topdrive
03:30 . 04:00 0.50 PULL P DECOMP Rih to top of packer, pushing something from 7220' to 7242'.
with 5-6K
04:00 - 05:00 1.00 PULL P DECOMP Mill over packer @ 7242 to 7244 with 75 rpms, 350 gpm, 900
psi, packer tum loose and started down hole.
05:00 - 07:00 2.00 PULL P DECOMP Push packer to 7324' , Circ bottoms up
07:00 - 10:30 3.50 PULL P DECOMP POH to BHA
10:30 - 11 :30 1.00 PULL P DECOMP Stand back BHA, lay down Bum shoe Assem.
11 :30 - 13:30 2.00 PULL P DECOMP Picking up BHA #3 overshot
13:30 - 15:30 2.00 PULL P DECOMP Rih to 7324'
15:30 - 16:00 0.50 PULL P DECOMP Tag packer push to 7458', Latch on to packer.
16:00·17:00 1.00 PULL P DECOMP Shear out circ. sub, with 2840 psi,círc bottoms up, with 500
gpm, 2840 psi, flow check well
17:00 - 22:00 5.00 PULL P DECOMP POOH with packer to BHA
22:00 - 00:00 2.00 PULL P DECOMP Stand back BHA,lay down fishing assm.lay down packer and
tail pipe assm., left slips and setting cones and packer rubbers
in hole.
10/24/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP Pickup stack washer wash out stack
01 :00 - 03:00 2.00 PULL N DFAL DECOMP PJSM, picking up BHA #4
03:00 - 05:00 2.00 PULL N DFAL DECOMP Rih with reverse circ sub to 7400'
05:00 - 06:00 1.00 PULL N DFAL DECOMP Wash 7400 to 7482 set down on top of hook wall hanger, pick
up and tum pipe 1/2 tum, went by top of hook wall hanger to
7489' set down, top of window in key slot @ 7487' to 7499',
work pipe trying to work junk in window
06:00 - 10:00 4.00 PULL N DFAL DECOMP Mill on junk 7489' to 7493 with 40-50 rpms, 1-2K wt. 350 gpm
1650 psi, lost 600 psi pump pressure
10:00 - 12:30 2.50 PULL N DFAL DECOMP Flow check well,POH to BHA
12:30 - 14:30 2.00 PULL N DFAL DECOMP Stand back hwdp,collars, lay down 2 7/8 pipe jars, bumper
sUb,(Jeft reverse circ sub in hole, 5.69 ft.)
14:30 - 15:30 1.00 PULL N DFAL DECOMP Wait on fishing tools
15:30 - 16:30 1.00 PULL N DFAL DECOMP Pickup BHA # 5, overshot,bumper sub, oil jars,circ sub,12 dC,6
hwdp
16:30 - 18:30 2.00 PULL N DFAL DECOMP Rih to 7488, wash last stand to bottom, 200 9pm, 490 psi
18:30 - 19:00 0.50 PULL N DFAL DECOMP Engage fish push to 7493, Plu 144K, Slo 90k, RIt 112k, tq 5k
19:00 - 21 :30 2.50 PULL N DFAL DECOMP POH to BHA
21 :30 - 23:00 1.50 PULL N DFAL DECOMP Stand back BHA back, lay down fish, found no metal in reverse
circ. sub, fingers in side was broke off,reverse circ sub was
bent starting about 2 ft up from mill
23:00 - 00:00 1.00 PULL N DFAL DECOMP Slip and cut drillline,service topdrive
10/25/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Finsh Cutting Drilling line
00:30 - 01 :30 1.00 PULL N DFAL DECOMP Picking up BHA #6, 4 5/8 mill,boot basket,boot basket,bit
sub,bumper sub,oil jar,string magnet,xo sub, 12 dC,6 hwdp
01 :30 - 03:30 2.00 PULL N DFAL DECOMP Rih to 7409
03:30 - 05:00 1.50 PULL N DFAL DECOMP washed from 7409 to 7491, Mill on junk 7491 45 rpms, 500
gpm, 1500 psi, making no head way, acts like the mill is in
bind, not milling on junk, quit rotating and put 25 k on mill
started sliding went to 7498, picked up to 7480 pull15k over to
pull mill thru, done this about 5 times making no head way, pull
mill to depth of window of mother bore 7488-7489 let pipe
rotate slow and pump 600 gpm 2000 psi PIU 144k, S/O 95,
RfT 114k
05:00 . 08:30 3.50 PULL N DFAL DECOMP Circulate condition mud - GPM 600 - PP 2000 - PU 137 - SO
Printed: 11m2005 9:57:36 AM
.
.
BP EXPLORATION
Operations Summary Report
Page 3 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-01
MPS-01
WORKOVER
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
1 0/15/2005
10/21/2003
14
Spud Date: 3/25/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
10/25/2005 05:00 - 08:30 3.50 PULL N DFAL DECOMP 90 - ROT 112 - TO 3.5
08:30 - 11 :00 2.50 PULL N DFAL DECOMP Flow check - POH from 7491' to BHA
11 :00 - 12:00 1.00 PULL N DFAL DECOMP Stand back HWT - DC's - Clean off magnet - Clean junk
baskets - LD jar assembly
12:00 - 12:30 0.50 PULL N DFAL DECOMP Lubricate rig
12:30 - 13:30 1.00 PULL N DFAL DECOMP Wait on tools
13:30 - 14:30 1.00 PULL N DFAL DECOMP PJSM - MU BHA - 3 1/2" Mule shoe - 3 joints 3 1/2" DP - Junk
baskets - Bumber sub - Jar - Magnet - Collars - HWDP
14:30 - 16:30 2.00 PULL N DFAL DECOMP RIH from 716' to 7482'
16:30 - 21 :00 4.50 PULL N DFAL DECOMP Attempt to work through liner - No success - Rotate string 60
rpm work through liner top - Con't wash down from 7482' to
7531' - GPM 700 - PP 2800 - TO 10 - RPM 60 - PU 170 - SO
80 - ROT 120 - Bottom out on HR profile in upper NE Lateral -
Pump 3 - 40 bbl sweeps - GPM 700 - PP 2800 - Lots sand
back 1 st sweep - 2nd sweep about half as the first - 3rd sweep
no sand back - Hole appears clean
21 :00 - 23:30 2.50 PULL N DFAL DECOMP Flow check - Well static - POH from 7531' to BHA @ 716'
23:30 - 00:00 0.50 PULL N DFAL DECOMP Stand back HWDP - Collars
10/26/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP Con't clean out junk baskets - (No recovered junk) - LD magnet
1- (No Junk recovered off magnet) - Jars assy - Moblize Baker
cutter assy to rig floor
01 :00 - 02:00 1.00 PULL N DFAL DECOMP MU cutter assy - MU BHA
02:00 - 03:30 1.50 PULL N DFAL DECOMP RIH from 605' to 7422'
103:30 - 05:00 1.50 PULL N DFAL DECOMP Establish cutting parimeters @ 7422' - RPM 30 TO 5 - PU 155
- SO 93 - ROT 117 - RIH to 7496' Could not pass - Rotate
j string down to 7508' - Work string from 7508 to 7512'
i
05:00 - 06:00 1.00 PULL N DFAL DECOMP Cut 4 1/2" tubing @ 7510' - GPM 500 - PP 1100 - RPM 45 - TO
8300 - TO dropped to 7300 - Indicated tubing cut
06:00 - 08:30 2.50 PULL N DFAL DECOMP Flow check - Well static - POH from 751 0' to 605'
08:30 - 09:30 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - Left 31/8' cutter assy and 3 7/8'
stablizer in hole
09:30 - 11:00 1.50 PULL N DFAL DECOMP Cut off drilling line - Top drive service - Moblize BHA
11:00 - 12:00 1.00 PULL N DFAL DECOMP MU fishing tools - Overshot with grapple - Jar assy - DC's -
. HWDP
12:00 - 12:30 0.50 PULL N DFAL DECOMP RIH with pump out sub - Collars - HWDP
12:30 - 14:30 2.00 PULL N DFAL DECOMP RIH from 611' to 7494'
14:30 - 15:00 0.50 PULL N DFAL DECOMP Attempt to engage fish - No success - PU 155 - SO 90 - ROT
112 - TO 6K
15:00 - 18:00 3.00 PULL N DFAL DECOMP POH from 7494' to 611'
18:00 - 18:30 0.50 PULL N DFAL DECOMP Stand back BHA - LD overshot - No fish retrieved
18:30 - 20:00 1.50 PULL N DFAL DECOMP MU spear assy - Jars - Collars - Accelerator jar - HWDP
20:00 - 22:00 2.00 PULL N DFAL DECOMP RIH from 595' to 7482'
22:00 - 22:30 0.50 PULL N DFAL DECOMP Engage hanger @ 7487' - Jared fish 3 times - Jar hanger free
with 80K over string weight - PU 155 - SO 90
22:30 - 00:00 1.50 PULL N DFAL DECOMP POH from 7487' to 3750'
10/27/2005 00:00 - 01:00 1.00 PULL N DFAL DECOMP Con't POH with spear assy - from 3750' to 595'
01 :00 - 02:00 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - Recovered 8' fish - Top 8' of
hanger assy - (2' of mother bore entry section on bottom of
fish) - Appromximately 9' left in Mother bore
02:00 - 03:00 1.00 PULL N DFAL DECOMP LD Baker tools - Accelerator - Spear assy - Clear rig floor of
extra tools
03:00 - 07:30 4.50 PULL N DFAL DECOMP Wait on tools from Deadhorse
07:30 - 08:00 0.50 PULL N DFAL DECOMP Moblize BHA to rig floor
Printed: 11f712005 9:57:36 AM
.
.
. BP EXPLORATION
Operations Summary Report
Page40f7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-01
MPS-01
WORKOVER
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
10/15/2005
10/21/2003
14
Spud Date: 3/25/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
10/27/2005 08:00 - 09:30 1.50 PULL N DFAL DECOMP MU Mills - Stablizers - Jars - DC's - HWDP
09:30 - 11 :30 2.00 PULL N DFAL DECOMP RIH with BHA # 11 - From 700 to 7347'
11 :30 - 12:00 0.50 PULL N DFAL DECOMP Establish drlg parimeters - Tag top of fish@ 7490' - PU 147-
SO 90 - ROT 112 - TO 5 - RPM 100
12:00 - 18:00 6.00 PULL N DFAL DECOMP Mill from 7490' to 7522' - RPM 95 - TO 8 - GPM 500 - PP 1790
18:00 - 19:30 1.50 PULL N DFAL DECOMP Pump sweep - CBU 4X - GPM 710 - PP 3240 PP - RPM 90-
TO 6K - Lot of fine metal - metal flakes - sand over shakers -
Well appeared to clean up after 4 bottoms up - Flow Check-
Well static
19:30 - 22:00 2.50 PULL N DFAL DECOMP POH from 7522' to 622'
22:00 - 23:00 1.00 PULL N DFAL DECOMP BHA - LD mill- (Mill 80% worn on face - 1/16' out of gauge)-
Lots of fine metal on magnet - No metal was recovered in Junk
baskets
23:00 - 00:00 1.00 PULL N DFAL DECOMP MU Reverse circ jet basket - Clean out assy
10/28/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Con't MU Reverse circ jet basket assy - MU DC's - HWDP
00:30 - 02:30 2.00 PULL N DFAL DECOMP RIH with Clean out assy - from 616' to 7422'
02:30 - 03:30 1.00 PULL N DFAL DECOMP Cut drlg line - Top drive I blocks service
03:30 - 05:00 1.50 PULL N DFAL DECOMP Fishing for junk I clean out from - 7522' to 7524' - GPM 500 -
PP 3380 - RPM 45 - TO 5.5· PU 153 - SO 85 - ROT 110-
05:00 - 08:30 3.50 PULL N DFAL DECOMP String hung up @ 7524' - Jar / work string free
08:30 - 12:00 3.50 PULL N DFAL DECOMP Flow check - Well static - POH to BHA
12:00 - 13:00 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - LD BHA - Jars - Boot baskets -
Magnet - Stablizers - Jet basket
13:00 - 13:30 0.50 PULL N DFAL DECOMP Clear rig floor of tools
13:30 - 15:00 1.50 EVAL N DFAL DECOMP PJSM - Rig up to test BOP's
15:00 - 18:30 3.50 EV AL N DFAL DECOMP Testing BOP's - Annular 250 low 2500 high 5 mins each test-
Top / Bottom VBR rams - Choke manifold - Manual Choke / Kill
valves - HCR choke I Kill valves - Upper / Lower IBOP - Floor
safety valves - Blind rams - 250 low 3000 high 5 mins each test
- Performed Accumulator test - Valve #6 failed on choke
manifold - All other test were good - Test witnessed by WSL /
John Spalding with AOGCC
18:30 - 19:30 1.00 EVAL N DFAL DECOMP Change out paddle and seat on valve #6 - Retested same -
Test good
19:30 . 20:30 1.00 EVAL N DFAL DECOMP RD testing equipment - Pull test plug - Install wear ring - Close
annulus valves - Blow down choke manifold - Moblize BHA to
rig floor
20:30 - 21 :30 1.00 PULL N DFAL DECOMP PJSM - MU Clean out assy - Mill - String mill - J-baskets -
Magnet - DC's - HWDP
21 :30 - 00:00 2.50 PULL N DFAL DECOMP RIH from 603' to 7450'
10/29/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Wash down from 7450 - Taking weight @ 7497' - PU - Slack off
tag with 2K rotate string fell off - Con't wash down to 7524' with
out rotary - PU 153 - SO 90 - ROT 112
00:30 - 03:00 2.50 PULL N DFAL DECOMP Wash - Ream junk I sand from 7524' to 7543' - WOM 4 to 8 -
RPM 60 - TO 6 - GPM 360 - PP 1300 - Stopped washing @
7543' - No Indication top of liner - Slack off without rotary to
7545' taking weight 5K - PU work string down taking weight 5K
@ 7545' - PU shut down pump work string 4 to 5 times without
pump taking weight 10K @ 7545' - Work string 3 times with
pump taking weight 10K @ 7545' - Work string with rotary 25
RPM - Stack 10K weight @ 7545' - Torque smooth no spike-
No erratic torque - No indication of top of liner other then taking
weight at 2' below projected top
Printed: 1117/2005 9:57:36 AM
.
.
BP EXPLORATION
Ope~atiøns Summary Report
Page 5 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-O~
MPS-01
WORKOVER
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
10/15/2005
10/21/2003
14
Spud Date: 3/25/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
10/29/2005 03:00 - 04:30 1.50 PULL N DFAL DECOMP Pump sweep - RPM 50 - TO 7K - GPM 450 - PP 1660 - PU /
SO several more times - Tag up 7545'
04:30 - 07:30 3.00 PULL N DFAL DECOMP Flow check - Well static - POH from 7540' to 603'
07:30 - 09:00 1.50 PULL N DFAL DECOMP Stand back BHA - LD mill - String mill - Magnet - J-baskets -
Clean same - No Junk recovered
09:00·10:30 1.50 PULL N DFAL DECOMP MU BHA - RIH with DC's I HWDP - With 4 3/4' mill assy - To
clean out isolation hanger
10:30 - 13:00 2.50 PULL N DFAL DECOMP RIH from 633' to 7545'
13:00 - 18:00 5.00 PULL N DFAL DECOMP Mill from 7545' to 7565 - Tag XO - WOM 4 to 6 - RPM 75 - TO
on 11 - off 6 - GPM 300 - PP 1050 - PU 155 - SO 90 - ROT 112
18:00 - 19:30 1.50 PULL N DFAL , DECOMP Circulate sweep around - GPM 360 - PP 1400 - RPM 45 - TO
7K - Flow check - Well static
19:30 - 22:00 2.50 PULL N DFAL DECOMP POH from 7565' to 633'
22:00 - 23:00 1.00 PULL N DFAL DECOMP LD 4 3/4' Clean out assy - Clean boot baskets - No Junk - No
junk marks on face of mill -
23:00 - 00:00 1.00 PULL N DFAL DECOMP Clear rig floor - LD Baker fishing tools - Moblize BHA to rig floor
10/30/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP MU 2 3/4' clean out assy - RIH with DC's - HWDP
01 :00 - 02:30 1.50 PULL N DFAL DECOMP RIH from 624' to 7350' - (Time change 1 hr back)
02:30 - 03:30 1.00 PULL N DFAL DECOMP Cut drlg line - Top drive service
03:30 - 05:00 1.50 PULL N DFAL DECOMP RIH tag up @ 7565 - Establish milling parimeters - GPM 76 -
PP 1150 off - 1250 to 1300 on - PU 155 - SO 90 - RPM motor
700 - Mill from 7565' to 7573' - Pump pressure increased to
1540 - Indication on top of prong - PU to 7570'
05:00 - 06:00 1.00 PULL N DFAL DECOMP Drop ball - Pump ball on seat to open circ sub - 18 spm @
1150 psi - Did not open
06:00 - 06:30 0.50 PULL N DFAL DECOMP POH 10 stands - From 7570' to 6595'
06:30 - 07:00 0.50 PULL N DFAL DECOMP Pump @ 18 spm @ 1000 psi - Attempt to open circ sub - Did
not open - Flow check - Well static
07:00 - 09:30 2.50 PULL N DFAL DECOMP POH from 6595' to 625' - Stand back BHA
09:30 - 10:30 1.00 PULL N DFAL DECOMP LD 2.79' Mill - MU 23/4' Shoe· RIH with BHA
10:30 - 13:00 2.50 PULL N DFAL DECOMP RIH from 630' to 7573' - Establish wash parimeters - PU 157-
SO 88 - GPM 76 - PP 630
13:00 - 15:00 2.00 PULL N DFAL DECOMP Wash over prong - from 7573' to 7579.5' -
15:00 - 17:00 2.00 PULL N DFAL DECOMP Drop 5/8' ball to open circ sub - Pump ball on seat - Open circ
sub - Pump sweep to surface - GPM 230 - PP 1070 - Flow
check - Well static
17:00 - 20:00 3.00 PULL N DFAL DECOMP POH from 7570' to 630'
20:00 - 21 :00 1.00 PULL N DFAL DECOMP Stand back DC's - HWDP - LD Mill - Motor - Boot baskets -
Magnet· XO's
21 :00 - 22:00 1.00 PULL N DFAL DECOMP MU Overshot Assy . RIH DC's - HWDP
22:00 - 00:00 2.00 PULL N DFAL DECOMP RIH from 645' to 7200'
10/31/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Con't RIH to 7570'
00:30 - 02:00 1.50 PULL N DFAL DECOMP Break Circulation - Displace well to seawater - Pump 30 bbl
sweep - 390 bbl seawater - spot 50 bbl perf pill on bottom -
BPM 11.5 - PP 2600
02:00 . 02:30 0.50 PULL N DFAL DECOMP Wash down @ 3 bpm - From 7576 to 7581' saw a small
increase in pump pressure as overshot went over prong -
Increase pump 10 BPM disk appered to shear @ 2900 psi -
(Disk set to shear @ 3200) - Attempt to Pull prong 5K over -
PU 155 . SO 90
02:30 - 03:00 0.50 PULL N DFAL DECOMP Flow check for 30 mins - Well static
03:00 - 03:30 0.50 PULL N DFAL DECOMP Pull 8 stands - @ 6800
Printed: 11f712005 9:57:36 AM
.
.
BP EXPLORATION
Operations Summary Report
Page 6 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-01
MPS-01
WORKOVER
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
10/15/2005
10/21/2003
14
Spud Date: 3/25/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
10/31/2005 03:30 - 04:00 0.50 PULL N DFAL DECOMP CBU - 7 BPM @ 920 psi - Flow check well 15 mins - Well static
04:00 - 06:00 2.00 PULL N DFAL DECOMP Blow down top drive - POH from 6800' to 645'
06:00 - 07:30 1.50 PULL N DFAL DECOMP Stand back BHA - No Fish recovered
07:30 - 08:00 0.50 PULL N DFAL DECOMP Rig service
08:00 - 14:30 6.50 PULL N DFAL DECOMP Wait on fishing tools
14:30 - 15:30 1.00 PULL N DFAL DECOMP MU BHA - MU JDC Hyd Overshot assy - RIH DC's - HWDP
15:30 - 18:30 3.00 PULL N DFAL DECOMP RIH from 651' to 7570' Fill pipe every 25 stands
18:30 - 20:30 2.00 PULL N DFAL DECOMP Attempt to engage prong - PU 145 - SO 90 - 16 spm @ 2080
psi - Wash from 7570' to 7578.6' - Tag with 10K down 100 psi
PP increase - Expected top of prong 7573' - shut down pump -
PU no overpull indicated - RIH tag 7982.4 without pump set
down weight 10K - PU no over pull indicated - Monitor well -
Well static - RIH tag up @ 7582.9' set down weight 15K without
pump - PU no overpull indicated - RIH to 7582.4' set down 15K
with 13 spm @ 1380 psi - Shut down pump - No overpull
indicated - Pull 1 stand
20:30 - 23:00 2.50 PULL N DFAL DECOMP Monitor well - Well static - POH from 7500' to 646'
23:00 - 00:00 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - LD BHA
11/1/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Con't LD BHA - No recovery of prong
00:30 - 01 :00 0.50 PULL N DFAL DECOMP Clear rig floor of tools
,01 :00 - 02:00 1.00 EVAL N DFAL DECOMP PJSM - Rig up Shlumberger E-Line
i 02:00 - 04:30 2.50 EVAL N DFAL DECOMP RIH with GR/CCI - Taking weight @ 7528' - Collar above
¡ window 7466' - Top window 7491 - Bottom window 7501 - Did
I not see collar below window @ 7507' - Work sting 2 to 3 times
no progress below 7528' - POH with tools
04:30 - 06:00 1.50 EVAL N DFAL DECOMP PU 4.0 Caliber/CCL-GR - RIH - Caliber stopped in window @
7496 - POH LD Logging tools
06:00 - 06:30 0.50 PULL N DFAL DECOMP RIH DC's - HWDP
06:30 - 08:00 1.50 PULL N DFAL DECOMP Slip and cut drlg line - Service Top drive
08:00 - 09:00 1.00 PULL N DFAL DECOMP Wait on Orders
09:00 - 09:30 0.50 PULL N DFAL DECOMP Moblize BHA to rig floor
09:30 - 10:00 0.50 PULL N DFAL DECOMP POH - HWDP - DC's
10:00 - 11:00 1.00 PULL N DFAL DECOMP MU BHA 4 3/4" Clean out assy
11 :00 - 14:00 3.00 PULL N DFAL DECOMP RIH with clean out assy from 631' to 7440'- Establish milling
pari meters - PU 140 - SO 95 - ROT 115 - GPM 365 - PP 1640-
RPM 60 - TO 4
14:00 - 15:00 1.00 PULL N DFAL DECOMP RIH with pump from 7440' to 7531' 3K down wt fell off - Con't
I RIH to 7561 to 7566' taking 1 to 2K - Con't RIH to 7573 taking
3 to 5K - @ 7574' set down 10K - PU to 7565' - RIH to 7574'
set down 10K - PU to 7567' - Rotate 60 RPM - TO 4 - Wash /
Mill to 7581' WOM 2 to 3 - TO 3 to 4 - Pull up to 7448' - No
Drag- Overpull
15:00 - 16:00 1.00 PULL N DFAL DECOMP Pump sweep around - Fine black to gray sand - Minimum metal
16:00 - 16:30 0.50 PULL N DFAL DECOMP RIH from 7448' to 7583 - Set down 15K - PU to 7573' - Wash
from 7573 to 7584 - WOM 15K - RPM 60 - TO 5K - GPM 365 -
! PP 1600 - PU to 7573
16:30 - 17:00 0.50 PULL N DAFL DECOMP Pump sweep around - Fine black to gray sand - small amount
metal off magnet's
17:00 - 19:30 2.50 PULL N DFAL DECOMP Mill from 7584 to 7586 - WOM 15 RPM 60 - TO 5.5 to 6 - GPM
365 - PP 1630 - Circulate @ 7561' - GPM 365 - PP 1600 - RIH
to 7585' - Wash and mill from 7585 to 7594 - RPM 60 - GPM
365 PP 1630-
Printed: 11/7/2005 9:57:36 AM
·
-
BP EXPLORATION
Qperatiøns Summary Re.pørt
Page 7 of 7
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-01
MPS-01
WORKOVER
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
1 0/15/2005
10/21/2003
14
Spud Date: 3/25/2003
End:
Date From - To Hours Task Code NPT Phase Description of Operations
11/1/2005 17:00 - 19:30 2.50 PULL N DFAL DECOMP 7585 to 7586 - 21 mins - WOM 3 to 5 - TO 5 to 6
7586 to 7587 - 16 mins - WOM 3 to 5 - TO 5.5 to 6.5
7587 to 7588 - 21 mins - WOM 3 to 5 - TO 6 to 7
7588 to 7590 - 7 mins - WOM 3 to 10 - TO 6.5 to 7.5
7590 to 7591 - 8 mins - WOM 10 - TO 7
7591 to 7592 - 7 mins - WOM 10 - TO 7.3
7592 to 7593 - 8 mins - WOM 10 - TO 7.3
7593 to 7594 - 7 mins - WOM 10 - TO 7.3
19:30 - 21 :00 1.50 PULL N DFAL DECOMP Pump sweep around - Fine black gray sand back - small
amount metal off magnet's - Flow check - Well static
21 :00 - 23:00 2.00 PULL N DFAL DECOMP POH from 7594 to 631'
23:00 - 00:00 1.00 PULL N DFAL DECOMP LD - HWDP - DC's
11/212005 00:00 - 00:30 0.50 PULL N DFAL DECOMP LD - 4 3/4" Clean out assy
00:30 - 01 :00 0.50 PULL N DFAL DECOMP Clear rig floor
01 :00 - 01 :30 0.50 T A N DFAL ABAN MU Howco 7 5/8" 29.7# Cement retainer
01 :30 - 05:00 3.50 T A P ABAN RIH with retainer to 7200'
05:00 - 05:30 0.50 T A P ABAN Shut top rams - Perform injectivity test - 2 bpm 870 psi pumped
20 bbls
05:30 - 06:00 0.50 T A P 'ABAN Set retainer @ 7200' - Test casing to 2050 psi for 5 mins - Test
good - Recheck injectivity 2 bpm @ 900 psi pumped 18 bbls
06:00 - 06:30 0.50 T A P 'ABAN Rig up cementing line - Blow down top drive
06:30 - 08:00 1.50 CEMT P .ABAN Pump 5 bbls H20-test lines to 3500 psi- Pump 25 bbls 15.8#
class "G" cement- 5 bbls H20- Displace em!. w/ rig pump 43.6
bbls. 5 bpm 500 psi taking returns through choke- Sting into
retainer- Squeeze 20 bbls em!. w/ 2bpm 850 psi- Unsting & pull
iABAN 5 stands slowly to leave 5 bbls em!. on top of retainer.
08:00 - 08:30 0.50 T A P Pump 40 bbl nutplug sweep around to clean DP- Reciprocate
90' while pumping 12 bpm
08:30 - 14:00 5.50 T A P IABAN POH- Lay down 4" DP
14:00 - 15:00 1.00 TA P IABAN Clear rig floor - Mobilize casing equipment - Rig up to run
, tubing
15:00 - 15:30 0.50 T A P IABAN Rig Service
15:30 - 19:00 3.50 RUNCOrvP ABAN PJSM - Run 4 1/2" kill string to 3650' - MU Tubing hanger - 88
joints total ran
19:00 - 19:30 0.50 RUNCOrvP ABAN RIH Land hanger - RILDS
19:30 - 20:00 0.50 EV AL P ABAN Test casing to 2050 psi - Hold for 30 mins - Record on chart -
IABAN Test good
20:00 - 20:30 0.50 WHSUR P Install TWC - Test to 1500 psi - Test good
20:30 - 22:00 1.50 BOPSUF P IABAN PJSM - Blow down choke - LD casing equipment - Nipple down
BOP's
22:00 - 23:30 1.50 WHSUR P ABAN PJSM - Nipple up adapter I tree - Test adapter to 5000 for 10
mins - Good test
23:30 - 00:00 0.50 WHSUR P ABAN RU to test tree
11/312005 00:00 - 01 :00 1.00 WHSUR P ABAN Test tree to 5000 psi - Test good - Pull TWC
01:00 - 01 :30 0.50 WHSUR P ABAN PJSM - RU to freeze protect well
01 :30 - 03:00 1.50 WHSUR P ABAN Test lines to 2000 psi - Pump 111 bbls diesel down annulus -
Take retums from tubing to pits - BPM 2 @ 420 psi
03:00 - 04:00 1.00 WHSUR P ABAN U-Tube freeze protection from annulus to tubing
04:00 - 06:00 2.00 WHSUR P ABAN Suck diesel from lines and tree top - Install BPV - Secure well -
Release rig @ 06:00 hrs 11/3/2005
Printed: 11n/2005 9:57:36 AM
Tree: 4-1/16" - SM FMC .
Wellhead: 11" x 4.S" SM G
w/4.S" TCII T&B Tubing Han r
4" CIW "H" BPV profile
j
20" x 34" insulated, 215 lIft A-53 ~
103/4" 45.5 ppf L-80 BTRC
(Drift ID = 9.794, cap. = .0961 bpf)
103/4" Super Seal II Float Shoe I 3140' I ....
75/8" 29.7 ppf, L-80, BTRC-mod production casing
(drift ID = 6.750", cap. = 0.0459 bpf)
4.5",12.6#, L-80 IBTtbg.
(cap. = .0152 bpf, id =3.958)
KOP @ 400'
53+ degree from 1950'
Max hole angle = 68 degree @ 5060'
58 degree @ Sleeve
Cement retainer set @ 7200'
e S' of cement on top)
Window in 7-5/8" Casing @ 7487' - 7499'
Well Angle @ window = 60°
Baker Hook Wall
Hanger inside 7-518" Window 7482'
Baker Hook Wall
Hanger outside 7-5/8" Window 7499'
Note: PXN Plug in XN-Nipple ía> 7,578'
Window in 75/8" Casing @ 7685' - 7697'
Well Angle @ window = 73°
Baker Tie Back Sleeve 7662'
Baker Hook Wall
Hanger inside 7-5/8" Window 7671'
Baker Hook Wall
Hanger outside 7-5/8" Window 7697'
Baker Tie Back Sleeve 7885' ~
Baker ZXP Liner Top Packer 7,892' -
Baker 7-5/8" x 5" HMC Liner Hanger 7,898'~
7-518" Halliburton Float Collar 8054'
7-5/8" Halliburton Float Shoe 8139'
DATE
04/16/03
10/21/03
72.50' (Doyon 14)
38.30' (Doyon 14)
M PS-01\L I \LZ.~..e~~:~.:
L
~ 61ro" H"" " @ 11 ,075' I "" ','""",,:00 ",M'
NE U Per Lateral 80 jts. - 4 1/2" Slotted Liner Rat Hole
p 12.6# L-80 IBT (7,755'-11,002') 30'
r:::; Tie back sleeve 7,542'
;/ ~:~:; ;-5/8"X 51/2" ZXP Liner top pkr. 7,550'
Baker 7-5/8"x 51/2" HMC Liner hanger. ~
~ ~1t-~:3!; XI\J Ì'lH>r::,; I 2 7"ü' No-Go I 7.S7!!'
\J G-t 2' r,:"le ,;hoe I 7.595' I
.
66 jts. - 41/2" R3 Slotted Liner
12.6# L-80 IBT (7,747'-10,199')
!ZíSS'>',S'>S1 ~
~ 61/8" Hole td @ 10,530' / Blm Baker41/2" Guide Shoe 10,243'
>
OA Lateral
..
(
Kill string @ 3,650'
Note:
Baker Hook wall hanger pulled in half
and milled up, Prior to the cement plug.
Rat Hole
287'
~
\..~ 1/8" Hole td @ 10,515' / Blm Baker41/2" "V" Float Shoe
'--- . 10,514'
60 jts. - 41/2",12.6# L-80, IBT
OB Lower Lateral Slotted Liner (8,117'-10,512')
~
REV. BY
MDO
MDO
COMMENTS
Drilled & Completed Doyon 14
NE Lateral & Completed Doyon 14
MILNE POINT UNIT
WELL 5-01\ L \ \ L~
API NO: 50-029-23141-6' L2
API NO: 50-029-23141-60 L 1
API NO: 50-029-23141-00
BP EXPLORATION (AK)
r;::0{\j1 l?·l· fM·' '1 ··1·· P~
~J ;' ,¡ ~t . .,' I I
...~ :\... ,'I ··n', '..., '.;:¡
~'\ U· !::!.\ . ~ : I
®:uuU ~
.
1.·f'U ... I.; fE. Þ.' ..IE~' 101 I
HHIF in! .,
0w u:,~
.
AI,~t¡1iA OIL AND GAS
CONSERVATION COMMISSION
Dan Kara
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
P.O, Box 196612
Anchorage, AK 99519-6612
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: MPS-O 1 L2
Sundry Number: 305-344
Dear Mr. Kara:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
Please provide at least twenty-four (24) hours notice for a representative of
the Commission to witness any required test. Contact the Commission's
petroleum field inspector at (907) 659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing, A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Encl.
~
cfl1 ((-'1'-' ô zJ
. STATE OF ALASKA .
ALASKA OIL AND GAS CONSERVATION COMMISSIO~E.
APPLICATION FOR SUNDRY APPROVÄ~O\} (} ~~ '[G05
20 AAC 25.280 .
~,ì -
1. Type of Request:
o Abandon
o Alter Casing
o Change Approved Program
II Suspend
o Repair Well
o Pull Tubing
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
99519-6612
KBE = 71.90'
8. Property Designation:
ADL 380110
11.
Total Depth MD (ft):
11075
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
o Operation Shutdown 0 Perforate
o Plug Perforations 0 Stimulate
o Perforate New Pool 0 Waiver
4. Current Well Class:
IBI Development 0 Exploratory
o Stratigraphic 0 Service
9. Well Name and Number:
10. Field I Pool(s):
Æ
11(,\
.... .,' ..~
o Other
o Re-Enter Suspended Well
o Time Extension
5. Permit To DrJll Number
203-169 V
6. API Number: /
50- 029-23141-61-00
MPS-01 L2
Milne Point Unit / Schrader Bluff
Total Depth rvD (ft): I Effective Depth MD (ft): IEffective Depth rvD (ft): Plugs (measured):
4243 11075 4243 7090
Length Size MD rvD Burst
78' 20" 112' 112'
3105' 10-314" 3140' 2375'
7454' 7-5/8" 7487' 4222'
3563' 4-1/2" 7482' - 11045' 4219' - 4243'
Perforation Depth MD (ft): I Perforation Depth rvD (ft): I Tubing Size:
None (Below Plugs) None 4-1/2", 12.6# (Kill String)
Packers and SSSV Type: None
Junk (measured):
None
Collapse
1490
5210
470
2480
6890
8430
4790
7500
Tubing Grade:
L-80
Packers and SSSV MD (ft): None
Tubing MD (ft):
3655'
12. Attachments:
IBI Description Summary of Proposal 0 BOP Sketch
o Detailed Operations Program
14. Estimated Date for
Commencing Operations: November 2, 2005
16. Verbal Approval: Date: 11/212005
Commission Representative: Tom Maunder
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Dan Kara Title Senior Drilling Engineer
Signature ~ ____ Phone 564-5803
Commission Use Only
13. Well Class after proposed work:
o Exploratory IBI Development 0 Service
'M11'
~PiigØedl~w 0 Abandoned
o WINJ \0 WDSPL
15. Well St~us er proposed work:
. o Gas
OWAG OGINJ
o Plug Integrity
o Mechanical Integrity Test
Conditions of approval: Notify Commission so that a representative may witness
o Location Clearance
o BOP Test
Other:
IGINAL
RBDMS SFI.
Contact John Rose, 564-5271
Date
Prepared By NameINumber.
" I O~ ) 05 Terrie Hubble, 564-4628
I Sundry Numbera>s-?' 11 1 '
COMMISSIONER
APPROVED BY
THE COMMISSION
Date ~i~(
.
.
-
bp
-
To: Tom Maunder - AOGCC
Date: November 3, 2005
From: John Rose - BPXA ACT Rotary Drilling
Subject: MPS-01 (Well Suspension)
On 11/02/2005, workover operations on MPS-01 were curtailed as the objectives of the
workover were considered to be unachievable, Therefore, with verbal approval of the
suspension from Tom Maunder with the AOGCC, well suspension operations were initiated on
11/01/2005 with the completion of those operations being on 11/03/2005, The suspension of
the well included the plugging of the upper NE lateral of the well with a 20 barrel cement
squeezed from below a retainer in the 7 5/8" main-bore casing at 7200' MD (5 bbls of cement
(-100') were also placed above that retainer) while the lower two laterals (the OA and OB
laterals) remained isolated by mechanical barriers which had been previously installed in the
well, The cement plug was then pressure tested to 2050 psi for 30 minutes,
MPS-01 was an Ugnu/Schrader Bluff tri-Iateral production well with laterals in the Schrader
Bluff OB (the lower lateral), the Schrader Bluff OA (the middle lateral) and the Ugnu NE (the
upper lateral), As the lower two laterals (OA & OB) were isolated by a packer assembly with a
plug in the tail-pipe prior to drilling the upper lateral (NE) of the well in October of 2003, the
intent of this recent workover was to remove the plug in the tail-pipe (the PXN plug in an XN
nipple at 7578' MD) which would allow resumed production from the two lower OA and OB
laterals of the well,
In summary, as the workover progressed all attempts to access to the main-bore of the well
below the upper lateral (as required to recover the plug in the tail-pipe at 7578' MD) proved to
be unsuccessful due to what appears to be mechanical problems at the liner hanger for the
upper lateral. It is generally concluded, that all of our clean-cut work efforts were either
diverted into the upper lateral or possibly to some open-hole sidetracking event, The deepest
clean-out on our final run into the well (using a 4 %" mill assembly spaced-out below a 6 %"
string mill) bottomed-out at 7592' failing to encounter any of the designed "no-~.o's" which
would have been an indicator that we indeed had access to the main-bore of the' well, 'That
being the case, it was decided to suspend the well as detailed in this notice leaving the well
above the suspension as a candidate for a future MPS-Pad sidetrack,
(Note: A total of 3 Sundry notices will be submitted for the suspension of this well, one for
each of the 3 laterals which are now isolated below the cement/retainer in the 7 5/8" casing in
the main-bore of the well-7202',)
-¡--------------
4-1/16" - 5M FMC
WeUtlea.d: 11" x 4.5" 5M Gen 6
wI 4.5" TCII T&B Tubing Hanger
4" CIW "H" BPV profile
#Ift
II
bpf)
Reaervoir FIWd
Window in 7·5/8" Casing @ 7487' -7499'
Well Angle @ window'" 60"
Baker Hook Wall
Hanger inside 7-5tf!t Window 7482'
Baker Hook Wall
Hanger outside 7-518" Window 7499'
Window in 75/8" Casing @ 7685' - 7697'
Well Angle @ window'" 73"
Baker Tie Back Sleeve 7662'
Baker Hook Wall
Hanger inside 7-518" Window 7671'
Baker Hook Wall
Hanger outside 7-518" Window 7697'
Baker Tie Back Sleeve 7885' f
Baker ZXP Liner Top Packer 7,892 .
Baker 7-5/8" x 5" HMC Liner Hanger 7,898'¿I
7-5/8" Halliburton Float Collar 8054'
7-5/8" Halliburton Float Shoe 8139'
04/16/03
10/21/03
08/09/05
MDO
MDO
DAJ
Drilled & Completed Doyon 14
NE Lateral & Completed Doyon 14
Corrected Phoenix gauge depth
~
Orig. KB elev.:::
Orig. GL. elev.=
10.
Cameo 4.5" x 1" w/ BK-S latch
sidepocket KGB-2 GLM
...
14)
14)
I 2,095' I
KOP @ 400'
53+ degree from 1950'
Max hole angle'" 68 degree @ S060'
58 degree @ Sleeve
Phoenix Discharge gauge (3.850 ID)
4.5" HES XC Dura slIding sleeve
NOTE: ID change min. 2.840"
Phoenix gauge ( 2.840" ID )
4.5" x 3.S" X-Over
7-5/8" x 3,5" Baker 8-3 Perm. Packer
3.5" HE8 X-Nipple (2.813" ID)
WLEG
1/8' Hole td 11,075' / HE$4.5" Floatstloe 11,045'
80 Slotted
12,6# ¡ST
~T¡e back sleeve
./ ::::~ ;-5I8'x 5112' ZXP Uner top pkr.
Baker 7-5I8"x 5112' HMC Uner hanger.
HE$ 3,5' XN-Nipple (2.750' No-Go )
5-112" Muleshoe! 7,59S'1
Upper Lateral
OA
'1
'-
10.
1/8'
I 8tm Baker 4
td
Rat Hole
30'
Rat Hole
287'
"'I
Float &l1oe
A 10.514
~:~he~¿{~~:~~~~~'¡ MPS-01 Current
wI 4.5" TCII T&S Tubing Hanger
4" CIW "H" BPV profile I l
20" x 34" insulated, 215 I/ft A-53 Œf
103/4" 45.5 ppf L-aO BTRC
(Drift 10 '" 9.794, cap. '" .0961 bpf)
10 3/4" Super Seal II Float Shoe
75/8" 29.7 pp1, L-BO, BTRC-mod production casing
( drift: 10 '" 6.750", cap. '" 0.0459 bpf)
Window in 7-518" Casing @ 7487' - 7499'
Well Angle @window'" 60·
Baker Hook Wall
Hanger inside 7-518" Window 7482'
Baker Hook Wall
Hanger outside 7-5/8" Window 7499'
Note: PXN Pluº iO XN-Nippe @ 7.578'
Window in 75/8" Casing @ 7685' - 7697'
Well Angle @ window'" 73"
Baker Tie Back Sleeve 7662'
Baker Hook Wall
Hanger inside 7 -5/iJ" Window 7671'
Baker Hook Wall
Hanger outside 7-5/8" Window 7697'
Baker Tie Back Sleeve 7885' r
Baker ZXP Liner Top Packer 7,892' -
Baker 7-5/8" x 5" HMC Liner Hanger 7,898' ~
7-5/8" Halliburton Float Collar 8054'
7-5/S" Halliburton Float Shoe 8139'
DATE
04/16/03
10/21/03
11/03/05
REV. BY
MDO
MDO
AM
COMMENTS
Drilled & Completed Doyon 14
NE Lateral & Completed Doyon 14
Well Suspension Doyon 14
'" 72.50' (Doyon 14)
slev.'" 38.30' (Doyon 14)
KOP @ 400'
53+ degree from 1950'
Max hole angle = 68 degree @ 5060'
58 degree @ Sleeve
- Base of Diesel I 2,400' MD I
...
~
- 4.5" 12.6#, L-BO, 1ST Tubing I
MD I
Seawater (8.5 ppg)
- Top of Cement I 7,090' MD I
5 bbl 15.S# class "G" cement
- Howco EZSV Retainer 17,202' MD I
- 20 bbI15.8# class "G" cement
NE Upper Lateral
6118" Hole Id @ 11,075' / HE$4.5" Float shoe 11,045'
4 1/2" Slotted Liner Rat Hoie
SO IBT (7,755'-11,002') 30'
.,.,
..
OA Lateral
66 jts. - 4 1/2" RS Slotted Liner Rat Hole
12.6# L-80 laT (7,747'-10,199') 287'
~~'!~~~~;~~ole Id @ 10,530' / Blm Baker 4112" GUide Shoe 10,243'
i
tSi/S" Hole Id @ 10,515' / Btm Baker4112" "V" Float Shoe
~ f 10,514'
OS Lower Lateral 60 jts. - 41/2",12.6# L-SO, laT
Slotted Liner (8,117'-10,512')
~
MILNE PQINT ijNIT
WELL $...01
API NO; 50-02~-23141-~O "-2
AP~ NO; 5Q-02~-2~14'-6Q l1
API NO: 50..02~-2~141-QQ
BP EXPLORATION (AK)
.
~ - /67'
~'s.
T\'''\\~ ~\~-\~S ~.\-'-\-\~ 2J<t<è?Qs\ö--'~'(:~'\s. \J'v\.c--"f ¡\t~~)·-\û ~é~\<s.c~~~)
T\\K= 0?P~\ s~c-\\a~~'-\ ,\~ \J'X'{'( \ \~ «"~~~~-d \\,~ ()'\J~\\Gb~,
~, s\~r:¿ ~\<D..c\~.. ~"<2, 0\- +~ \(l~\O-\~ \,V{ ~ \ \JE- (\«(D\)t~':
~~_ \-.~\~~~,~~~L. ,~.ll. ~"'C....~~ .G...\Cè. ~~S\~~
è> 0':>\>Q.1'\.~ . "Dr """:'i \¡)~ 0f~~~~ -x, CCrE>'ìJ (\ -\k,"
L ^ ß L· - L _ ~ ~ >~ . .- . . Q c::'\
'..L ( d-. ~~('j~o \J-..J.t~+\,-·4Yxdi~-\'~xba~ cz,~s~t0(cJ,
R ~ - \ "j O~\'--· -\-\t~ d~ i\~~( SR+' I'-J~. ~O\~ ~ ~~-
~ c.; \D..\. s ~ "è \, \ G3Jed /6 ~ ~~,,~, A.. v\ -2Ö~ \X ~c\\~~
~ ~~\(§~~ ú.-+--\-\......c¿ \~\~ \~L\\~~,. ~~CJ\~\\G"'á\~">
. . ,~\>::!L\~ \-,~~s ~\\,,'\ "-~ s.c..~ \,~ ~~ '<''<-C6s¡:,..''ì " C\
Å."---\ c..~""'MI<.v&. l ~,s,c;:,,,,~~ '1Ð 0 M-\:~"\<:"''-.J'" "-.Ì, \\ \DEe Qf~~'
I \J'..j '\ \ "- S <L+ CJ- <t) '\;<3. C'-.J ~ S\;'Ù "-So\. ~~ \. V\..~~ ~o....µ''>.. ~ t((~
e
.
~ð7J'-ltó?
:\\ \ ). (Ç')
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
March 31, 2004
RE: MWD Fonnation Evaluation Logs MPS-01 L2,
AK-MW-2714264
1 LIS fonnatted Disc with verification listing.
PûPI#: 50-029-23141~1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
./ ,
./ /
Date: ~<-:j/O "/
·1/
Signed I /JA."J ol.t~
e
e
de) ~;, -/& T
\ ~ ljSc\
WELL LOG TRANSMI1TAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
March 31, 2004
RE: MWDFonnationEvaluationLogs MPS-Ol L2PB1,
AK-MW-2714264
1 LIS fonnatted Disc with verification listing.
JlPI#: 50~29-23141-71
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd,
Anchorage, Alaska 99649-6612
/
Date: f(//5 if} ,V
/
Signed ÎL1 oiL I
. STATEOFALASKA .
ALASKÞ1 AND GAS CONSERVATION COM . ION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a, Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG
20MC 25.105 20MC 25,110
21. Logs Run:
MWD , GR , RES, ABI , PWD , IFRlCASANDRA
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
BoTTOM SIZE
112' 42"
3140' 13-1/2"
7487' 9-7/8"
11045' 6-1/8"
o GINJ 0 WINJ 0 WDSPL No. of Completions
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a, Location of Well (Governmental Section):
Surface:
3375' NSL, 4714' WEL, SEC. 07, T12N, R11E, UM
Top of Productive Horizon:
1420' NSL, 239' WEL, SEC. 06, T12N, R11E, UM
Total Depth:
4509' NSL, 767' WEL, SEC. 06, T12N, R11 E, UM
4b, Location of Well (State Base Plane Coordinates):
Surface: x- 566077' y- 6000045' Zone- ASP4
TPI: x- 570509 y- 6003410 Zone- ASP4
Total Depth: x- 569940 y- 6006494 Zone- ASP4
18, Directional Survey 181 Yes 0 No
22.
CASING
SIZE
Wr.<PERFT.
92#
45.5#
29.7#
12.6#
34'
35'
33'
7482'
20"
H-40
L-80
L-80
L-80
10-3/4"
7-5/8"
4-1/2"
23. Perforations oRen to Production (MD + TVD of To,e and
Bottom Interval, Size and Number; if none, state' none"):
4-1/2" Slotted Liner
MD TVD MD TVD
7755' - 11002' 4257' - 4243'
One Other
5. Date Camp., Susp., or Aband.
10/21/2003
6. Date Spudded
10/16/2003
7. Date T.D. Reached
10/18/2003
8. Elevation in feet (indicate KB, DF, etc.)
KBE = 71.90'
9. Plug Back Depth (MD+ TVD)
11075 + 4243 Ft
10. Total Depth (MD+TVD)
11075 + 4243' Ft
11. Depth where SSSV set
N/A MD
19. Water depth, if offshore
N/A MSL
1 b. Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
12. Permit Number
203-169
13. API Number
50- 029-23141-61-00
14, Well Number
MPS-01L2
15. Field and Pool
Milne Point Unit I Schrader Bluff
16. Lease Designation and Serial No.
ADL 380110
17. Land Use Permit:
20. Thickness of Permafrost
1800' (Approx.)
260 sx Arctic Set (Approx.)
946 sx PF 'L', 275 sx Class 'G'
160 sx PF 'E', 293 sx Class 'G'
Uncemented Slotted Liner
24.
SIZE
4·1/2'x 3-1/2", 12,6# x 9,2#, L-80
DEPTH SET (MD)
7292'
PACKER SET (MD)
7242'
25.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD)
1800'
PRODUCTION TEST
Method of Operation (Flowing, Gas Lift, etc,):
Hydraulic Pump
Oll-Bsl GAs-McF WATER-Bsl
342 17 0
26.
Date First Production:
October 26, 2003
Date of Test Hours Tested PRODUCTION FOR
10/29/2003 6 TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED ...Itr...
Press. 24-HoUR RATE"""
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state '~none".
Oll-Bsl
None
GAs-McF
WATER-Bsl
".".!'Þ..~ y'.~~$
--.~Al 0 RIG I N A L
CONTINUED ON REVERSE SIDE 01~
Form 10-407 Revised 2/2003
AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 75 Bbls of Diesel.
I GAS-Oil RATIO
51
Oil GRAVITY-API (CORR)
CHOKE SIZE
.... Sf'-
t()~ 25 20lß
28.
GEOLOGIC MARKER.
NAME
MD
TVD
29. ARMATION TESTS
Include and briefy~marize test results, List intervals tested,
and attach detailed supporting data as necessary. if no tests
were conducted, state "None".
TUZC
MA
MB1
MB2
MB2-1
MC
SBF2-NA
SBF21
SBF24-MF
SBF1-NB
SBF1-NBR
SBF12
SBE4-NC
SBE41
SBE2-NE
6344'
6906'
6955'
7061'
7217'
7298'
7358'
7362'
7403'
7408'
7423'
7448'
7458'
7470'
7488'
3694'
3924'
3948'
4000'
4080'
4123'
4155'
4157'
4179'
4181'
4189'
4202'
4207'
4213'
4223'
None
30. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary.
31. I hereby certify that the fore~oing is true and correct to the best of my knowledge.
Signed sond~~ Title Technical Assistant Date [1- ZO" 03
M PS-O 1 L2 203-169 Prepared By Name/Number: Sondra Stewman, 564-4750
Well Number Drilling Engineer: Walter Quay, 564-4178
Permit NO.1 Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None",
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 2/2003
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
10/9/2003
10/10/2003
10/11/2003
~
..
BP AMOCO
Operations Summary Report
MPS-01 L2
MPS-01 L2
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 14
From - To Hours ¡ Task Code NPT. Phase
22:00 - 00:00
00:00 - 01 :30
01 :30 - 02:00
02:00 - 03:00
03:00 - 04:30
04:30 - 05:30
05:30 - 07:00
07:00 - 09:30
09:30 - 10:30
10:30 - 13:00
13:00 - 13:30
13:30 - 14:00
14:00 - 15:00
15:00 - 19:30
19:30 - 20:00
20:00 - 22:30
22:30 - 23:00
23:00 - 00:00
00:00 - 00:30
00:30 - 01 :30
01 :30 - 03:00
03:00 - 04:00
2.00 MOB
1.50 MOB
0.50 MOB
1.00 RIGU
1.50 PULL
1.00 PULL
1.50 PULL
2.50 PULL
1.00 PULL
2.50 PULL
0.50 PULL
0.50 PULL
1.00 PULL
4.50 PULL
0.50 PULL
2.50 PULL
0.50 PULL
1.00 PULL
0.50 PULL
1.00 PULL
1,50 PULL
1.00 PULL
".__.. n__..._
P
PRE
P
P
P
PRE
PRE
PRE
P
DECOMP
P
DECOMP
P
P
DECOMP
DECOMP
P
P
DECOMP
DECOMP
P
P
P
P
DECOMP
DECOMP
DECOMP
DECOMP
P
P
DECOMP
DECOMP
P
N
DECOMP
SFAL DECOMP
N
DFAL DECOMP
N
SFAL DECOMP
N
SFAL DECOMP
N
SFAL DECOMP
Page 1 of 5
Start:
Rig Release:
Rig Number:
Spud Date: 10/10/2003
End:
10/10/2003
10/21/2003
Description of Operations
__._....._._.____.______~____ __.. . ,___u __._____.___._ .._____n___
Lay liner - set matts for rig move
Move rig over S-01 L2 well - shim rig
Skid rig floor from move position to drlg position
Rig up - Set rockwasher - Berm same - rig up rockwasher -
Accept rig @ 03:00 hrs
Rig up double valve on annulus - rig up circulating line from
annulus to choke - Rig up on tree to circulate down tubing -
move equipment for passage around rig with vac trucks -
Pick up / make up lubricator to tree - Pull BPV - rig down
lubricator - (No pressure on annulus)
Take on seawater in the pits
Displace freeze protect - con't circulate to get clean seawater
to surface - Returns @ 70% - monitor well one hour - fill hole
with 38 bbls - mix and spot XC polymer pill
Monitor well for 30 minutes - fill hole took 38 bbls in 30 minutes
Mix solids free Flo Pro LCM pill and 100 bbls 8.4 brine - pump
28 bbls solids free Flo Pro LCm pill - spot on bottom with 950
stks @ 30 spm 200 psi
Set TWC - test from top to 1000 psi
Help pull high line power from S-22 to S-01 L2
Nipple down tree
Nipple up BOP's - Change out new choke hose with old choke
hose - hose to long to make up
Rig up test equipment
Test BOP's - Top Rams - Blinds - Choke manifold - Hyd Kill/
Choke - Manual Kill/ Choke - Floor safety valves - Upper /
lower 10BP valves - 250 low - 3500 high 5 mins each test -
Annular 250 low - 2500 high 5 mins each test - Accumlator test
- Did not test lower rams due to xo sub and pup joint to hanger
up in body of rams - Will test lower rams after lay down tubing.
Test witnessed by Jeff Jones with AOGCC
Rig down test equipment
Back out test joint - 4,5" tubing pup screwed into hanger stayed
in hole when test joint backed out - Lay down test joint - RIH
with TWC retrieving tool on dry rod to confirm no psi under
TWC - POH with dry rod and TWC retrieving tool - Rig up
pump in sub and 3.5" TIW 3,5" IF box X 4,5" IBT pin XO - PU
4.5" landing joint - screw into pup joint on top of hanger
PJSM on pulling tubing string - Pick up to 150K - Work string -
Pull up to 160 - Work string - Pull to 170K - Work string - Pull to
175K - Work string - Pull to 190K - Work string - Pull 200K -
Work string - Pull to 210K - Work string - No success
Set hanger back in tubing head - RILDS - Open door on bottom
rams - attempt to back out 4.5" pup - Top of pup 3" below door
- Attempt to back out pup using landing joint - landing joint
broke at pup - Shut door - Un-bolt BOP from tubing head - Pick
up stack - Break pup with 48" pipe wrench and come-along -
Pull landing joint and 4,5" pup joint from hanger -
Set stack down on tubing head - tighten up stack - Close Blinds
- Retest body to 250 low - 3500 high for 5 minutes each test -
Recorded on chart
RIH with dry rod - check for pressure - No pressure - Pull TWC
Printed: 10/27/2003 11:34:16 AM
'III(WI"
-
BP AMOCO
Op~raUons Summary Report
Page 2 of 5
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-01 L2
MPS-01 L2
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 14
Start:
Rig Release:
Rig Number:
10/10/2003
10/21/2003
Spud Date: 10/10/2003
End:
Date From - To Hours ! Task Code NPT Phase Description of Operations
__._..__n _.n __..__ ..... -........... -... ... ........ .....--... .........-. --.-- . - ----
10/11/2003 03:00 - 04:00 1.00 PULL N SFAL DECOMP with dry rod - Fill hole 58 bbls - Losses 100 bbl per hour
04:00 - 08:00 4.00 PULL N DFAL DECOMP Install shooting nipple - Change elevator bails - Rig up Howco
slick line - RIH with 2.813 PXM plug - PXM plug set down 7524'
- two licks fell through - Continue running in hole to 7660' SLM -
(2.75 XN no-go at 7548' tubing measurements) - POH with plug
08:00 - 10:00 2,00 PULL N DFAL DECOMP RIH with 2.69" swedge with tubing end locator on slick line -
located tubing end @ 7524' SLM - POH with swedge and
locator
10:00-11:00 1,00 PULL N DFAL DECOMP RIH with X-line running tool to locate "X" nipple above packer-
"X" nipple located 7494' SLM - POH with X-line running tool - (X
nipple @ 7487' tubing measurements)
11 :00 - 12:00 1,00 PULL N DFAL DECOMP Rig down Howco slick line - Hole taking 52 bbl hour total loss
for 12 hours 629 bbls
12:00 - 13:30 1.50 PULL N DFAL DECOMP Schlumberger rehead .31 braided line - PJSM on rigging up
tools
13:30 - 15:00 1,50 PULL N DFAL DECOMP Rig up Schlumberger
15:00 - 17:00 2,00 PULL N DFAL DECOMP RIH with chemical cutter on E-line - @ 7490' - Make cut - POH
17:00 - 17:30 0,50 PULL N DFAL DECOMP Rig down Schlumberger
17:30 - 18:00 0,50 PULL P DECOMP Make up landing joint - Back out lock down screws - pull tubing
free @ 165K - PU weight 11 OK - Pull hanger to surface
18:00 - 20:00 2,00 PULL P DECOMP Circulate surface to surface 385 bbls - @ 3 bpm 90 psi - 60%
returns
20:00 - 20:30 0.50 PULL P DECOMP Break out landing joint - tubing hanger - circulating hose - XO -
3 1/2" TIW - 3 1/2" XO from IF box X IBT pin - Change bails
20:30 - 00:00 3.50 PULL P DECOMP Pull 4,5" tubing completion string - Lost 813 bbls last 12 hours
for avg 67.75 bph
10/12/2003 00:00 - 04:00 4.00 PULL P DECOMP PJSM - Pull and Lay down 4.5" tubing completion string -
Recovered 179 jts of 4,5" tubing - Phoenix gauge - HES Dual
sliding sleave - Phoenix jet pump gauge sensor - XO - XO - .45
of X nipple - Left in hole .59 X nipple - 3,5" pup 7,75 - XO pup
1,75 - Baker packer 7,02 - XO pup 3,5" 1.74 - 3.5" pup jt 9,77 -
3,5" tubing jt 31.97 - XN nipple 1,29 - 3.5" XO pup 3.01 - 3.5"
WLG 1.29 - (Recovered 97 clamps)
04:00 - 05:00 1.00 PULL P DECOMP Clear rig floor of all tubing equipment - Rig down casing
equipment
05:00 - 06:00 1.00 PULL N SFAL DECOMP Install test plug - open annulus valve - Rig up testing
equipment - Test lower rams to 250 low /3500 high 5 mins
each test - Rig down test equipment - Pull test plug - Install
wear ring - Close annulus valves
06:00 - 06:30 0.50 PULL N DFAL DECOMP Pick up milling assembly from v-door - PJSM with Baker Tech
06:30 - 09:00 2.50 PULL N DFAL DECOMP Make up milling assy - Per Baker hand - Change out to 4"
handling tools
09:00 - 14:30 5.50 PULL N DFAL DECOMP Con't RIH with 4" dp from pipe shed to 7486'
14:30 - 00:00 9.50 FISH N DFAL DECOMP Mill 3.5" tubing - Packer from 7486' to 7499' - Varied WOM
from 25K to 40K - RPM 50 to 110 - TQ 5K to 9K - GPM 100 to
300 - PP 70 to 1940
10/13/2003 00:00 - 01 :00 1.00 FISH N DFAL DECOMP Milling on packer from 7499' to 7501' - Varied WOM 25K to
50K - RPM 50 to 110 - GPM 100 to 300 TQ 5K to 9K - PP 70 to
700
01 :00 - 01 :30 0,50 FISH N DFAL DECOMP Push packer to 7544' - Set 50K on packer no movement
01 :30 - 02:30 1,00 FISH N DFAL DECOMP CBU - 4 bpm @ 510 psi
02:30 - 04:00 1.50 FISH N DFAL DECOMP POH with milling assy from 7544' to 7000' - Hole swabbing bad
- Pulling 20K to 40K every 40' - (appears to be dragging packer
Printed: 10/27/2003 11:34:16AM
.....
.
BP AMOCO
o.perations Summary Report
Page 3 of 5
Legal Well Name: MPS-01 L2
Common Well Name: MPS-01 L2 Spud Date: 10/10/2003
Event Name: REENTER+COMPLETE Start: 10/10/2003 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 1 0/21/2003
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
.--. .....--.. -------...--. - ..
10/13/2003 02:30 - 04:00 1,50 FISH N DFAL DECOMP up hole) - Pump out at 2 bpm from 7000' to 6589' - @ 6589' did
not see any more overpulls - 6589' pull two stands to 6398' no
swabbing no overpulls - (appears to have lost packer @ 6550')
04:00 - 06:00 2,00 FISH N DFAL DECOMP Blow down Top Drive - Con't POH from 6398' to BHA
06:00 - 07:00 1,00 FISH N DFAL DECOMP Stand back 3,5 HWP and 4 3/4 DC, clean out boot baskets and
clear floor
07:00 - 07:30 0.50 FISH N DFAL DECOMP Make up spear and run in BHA
07:30 - 09:30 2,00 FISH N DFAL DECOMP Rih with spear to 7546
09:30 - 10:30 1.00 FISH N DFAL DECOMP Push fish from 7549 to 7649, latch on to packer
10:30 - 15:00 4.50 FISH N DFAL DECOMP Tripping out with packer, pull to 6837 hole swabbing, pumped
out to 6452, drop ball open circ sub" trip out to BHA.
15:00 - 16:00 1.00 FISH N DFAL DECOMP Brake out spear and packer, lay down same, no tail pipe
recover
16:00 - 16:30 0.50 FISH N DFAL DECOMP Make up BHA #3, 6.125 bit, bit sub, magnet, bumper
sub,jars, 12 4 3/4 dC,15 HWP
16:30 -19:00 2.50 FISH N DFAL DECOMP Trip in with bit and magnet to 7,649 top of tail pipe
19:00 - 19:30 0.50 FISH N DFAL DECOMP Worked magnet, try to pick up cuttings, turn pipe slow and
worked up and down slow
19:30 - 22:00 2.50 FISH N DFAL DECOMP Tripping out with magnet and bit. recover 2 # of metal cutting
and 7 flat pieces 2 to 3" long
22:00 - 00:00 2.00 FISH N DFAL DECOMP Pick up BHA #4 spear for 3,5 9,2 tubing, tripping in hole
10/14/2003 00:00 - 00:30 0.50 FISH N DFAL DECOMP RIH in hole to top of fish @ 7649
00:30 - 01 :00 0,50 FISH N DFAL DECOMP Working in to fish, pushed fish to 7656, circ slow
01 :00 - 05:00 4,00 FISH N DFAL DECOMP Tripping out with tail pipe, pull to 7480 swabbing ., dragging 8
to 10,000#, pumped out to 6730,pull without swabbing
05:00 - 06:30 1,50 FISH N DFAL DECOMP Laying down fish, Clear floor
06:30 - 07:00 0,50 FISH P DECOMP Pickup BHA #5 Bit,Scraper,magnet
07:00 - 09:30 2,50 FISH P DECOMP Pickup 42 jts of pipe from pipe shed and trip in to top of liner
@7662
09:30 - 12:00 2,50 FISH P DECOMP POH, lay down magnet and scraper, recover 2# of fine cutting
on magnet.
12:00 - 13:00 1,00 STWHIP P PROD2 Pickup Baker HMC liner hanger and ZXP liner top packer and
3.5 tail pipe with PX plug in XN nipple
13:00 - 18:00 5,00 STWHIP P PROD2 Tripping in with packer to 7594, top of packer 7550', top of liner
7542.92 XN nipple 7578'
18:00 - 19:30 1,50 STWHIP P PROD2 Drop 29/32 ball and set packer, pumped ball down 1 bbl min
1100 psi, set hanger with 1800, set packer with 3200 psi, test
backside with 1000 psi, released from hanger
19:30 - 22:00 2,50 STWHIP P PROD2 Tripping out with running tools, lay down same
22:00 - 00:00 2,00 STWHIP P PROD2 Rig up slick line unit and run in hole with Prong and set in PX
plug @ 7578' , rig down slickline unit
10/15/2003 00:00 - 00:30 0,50 STWHIP P PROD2 Test csg to 1000 psi for 30 min.
00:30 - 04:00 3,50 STWHIP P PROD2 Pickup space out pups, whipstock, BHA # 6, test MWD
04:00 - 07:00 3,00 STWHIP P PROD2 Tripping in with whipstock
07:00 - 07:30 0,50 STWHIP P PROD2 Orient whipstock 20 drgrees to right, set down on liner top @
7543' , shear Whipstock, ,Displace well to 9.5 Flo-Pro mud
07:30 - 10:00 2.50 STWHIP P PROD2 Mill window from 7487 to 7499 Drill to 7510, work window
10:00 - 10:30 0,50 STWHIP N DFAL PROD2 Lost 500 psi. after picking up off bottom, lost Mwd Pulses at
same time, surface test Eqp, flow check well
10:30 - 14:00 3,50 STWHIP N DFAL PROD2 POH, looking for wash out, Left in hole 6.25 ' of Bumper sub,
MWD too, Float sub,1 jt HWP, upper mill, lower mill, starter mill,
106.88 ft. top of fish is 7403'
14:00 - 15:00 1,00 STWHIP N DFAL PROD2 M/U fishing BHA, 5.75 over shot with 4 3/4 grapple, bumper
Printed: 10/27/2003 11:34:16 AM
~
A
BPAMOCO
Operations Summary Rep·ort
Page 4 of 5
Legal Well Name: MPS-01 L2
Common Well Name: MPS-01 L2 Spud Date: 10/10/2003
Event Name: REENTER+COMPLETE Start: 10/10/2003 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/21/2003
Rig Name: DOYON 14 Rig Number:
¡ I
Date ¡ From - To Hours ¡ Task ¡Code NPT,< Phase Description ofOperatibns
h _..._.______ ___ .__" - __h...O_____ ___
10/15/2003 14:00 - 15:00 1.00 STWHIP N DFAL PROD2 sub, jars,12 dc" 15 HWP
15:00 - 16:30 1.50 STWHIP N DFAL PROD2 Tripping in to 7283
16:30 - 18:00 1,50 STWHIP N DFAL PROD2 Slip and cut drilling line, seNice top drive
18:00 - 18:30 0.50 STWHIP N DFAL PROD2 Circ and worked over fish @ 7403' string pressure up fish
plugged, pull fish free with 150,000 # string wt was 135,000
18:30 - 22:30 4,00 STWHIP N DFAL PROD2 Tripping out with fish, Laying down same
22:30 - 23:00 0.50 STWHIP P PROD2 Pickup Johnny Wacker and wash BOPS
23:00 - 00:00 1.00 BOPSURP PROD2 Pull Wear ring, Test Bops and manifold 250-3500 psi 5 min per
test, Test Hydrill 250-2500 psi 5 min per test, the right to
witness test was wavier by John Crisp AOOGC
10/16/2003 00:00 - 03:00 3.00 BOPSURP PROD2 Test Bops and manifold 250-3500 psi 5 min per test, test
Hydrill 250-2500 psi 5 min per test, the right to witness test was
wavier by John Crisp AOOGC, install wear ring
03:00 - 05:00 2.00 DRILL P PROD2 Pick up BHA # 8 FM2643 bit with 3X13, 43/4 Sperry drill 1 ,83
bend,4 3/4 GRlRESIDM, 4 3/4 PWDITM, 3 flex dc, jars,
05:00 - 09:00 4,00 DRILL P PROD2 Tripping in hole, Picking up 93 jts of pipe from pipe shed
09:00 -10:00 1.00 DRILL P PROD2 Orient and slide tru window with no problem, Drill 7510 to 7521"
10:00 - 10:30 0.50 DRILL P PROD2 Pull tru window, perform FIT 9,5 mw, TVD 4228, 350 psi = 11,0
EMW
10:30 - 00:00 13.50 DRILL P PROD2 Directional Drill 7521' to 8245' with 80 rpm 254 gals, 2500 psi
AST 5,08, ART 5.92, TQ 5K
10/17/2003 00:00 - 00:00 24.00 DRILL P PROD2 Directional Drill 8245' to 9680 with 80 rpm 254 gals, 2680 psi
AST 7,66 ART 8.83 ADT 16.49
10/18/2003 00:00 - 09:00 9.00 DRILL P PROD2 Directional Drill 9,680 to 10393' with 80 rpm 254 gals, 2650 psi
Went out top of pay @ 10,035
09:00 - 09:30 0.50 DRILL N DPRB PROD2 Circ, for open hole side track with 80 rpm, 250 gals min 2,250
psi
09:30 - 10:00 0.50 DRILL N DPRB PROD2 Pump out to 9913' with full drilling rate
10:00 - 12:30 2.50 DRILL N DPRB PROD2 Preform open hole side track, troughing low side
side track @ 9968
12:30 - 23:30 11.00 DRILL P PROD2 Directional Drill 9,968' to 11,075' TD with 80 rpm 254 gals,
2650 psi
AST 3,09 ART 9.83
23:30 - 00:00 0,50 CASE P COMP Circ with 280 gals min. 2900 psi 90 RPMS
10/19/2003 00:00 - 05:30 5.50 CASE P COMP Circ 7 bottoms up with 280 gals min. 2900 psi 90 RPMS,
(Knocking ice build up off derrick before we trip, Started @ 1 :00
am)
05:30 - 09:30 4.00 CASE P COMP Pumping out to Window@ 7,499 with full drilling rate 11,075 to
7,520'
09:30 - 10:00 0.50 CASE P COMP RIH with 5 stands to 8,000 ft., Pumping out to window with full
drilling rate 8,000 to 7,520
10:00 - 13:00 3.00 CASE P COMP Slug pipe, Tripping out to BHA
13:00 - 14:00 1.00 CASE P COMP Lay down BHA
14:00 -16:00 2.00 CASE P COMP M/U Whipstock hook assem., down load and upload MWD,
16:00 - 18:00 2.00 CASE P COMP RIH to 6700'
18:00 - 19:00 1.00 CASE P COMP Slip and cut Drilling line, seNice top drive
19:00 - 19:30 0.50 CASE P COMP RIH to 7492'
19:30 - 21 :00 1.50 CASE P COMP Orient hook assem , engage whipstock and pull free
21 :00 - 22:30 1.50 CASE P COMP Tripping out to BHA
22:30 - 00:00 1.50 CASE P COMP Laying down BHA
10/20/2003 00:00 - 02:00 2.00 CASE P COMP Laying down whipstock and space out jts" clear floor of tools
02:00 - 03:00 1,00 CASE P COMP Rig up to pick up liner, PJSM
03:00 - 06:00 3.00 CASE P COMP Picking up one bend shoe jt. 4.5, 12,6#, L-80, solid liner and 80
Printed: 10/27/2003 11:34:16AM
.
.
'Page 5 of 5
BP AMOCO
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-01 L2
MPS-01 L2
REENTER+COMPLETE
DOYON DRILLING INC.
DOYON 14
,
Date From - To Hours Task Code I NPT Phase
10/20/2003 03:00 - 06:00 3.00 CASE P COMP
06:00 - 09:00 3.00 CASE P COMP
09:00 - 10:00 1.00 CASE P COMP
10:00 - 14:00 4.00 CASE P COMP
14:00 - 16:00 2.00 CASE P COMP
16:00 - 17:00 1.00 CASE P COMP
17:00 - 19:30 2.50 CASE P COMP
19:30 - 23:00 3.50 CASE P COMP
23:00 - 00:00 1.00 RUNCOIIIP COMP
10/21/2003 00:00 - 11 :30 11.50 RUNCOIIIP COMP
11 :30 - 12:00
0.50 RUNCOIIIP
COMP
12:00 - 12:30
0.50 RUNCOIIIP
COMP
12:30 - 13:00 0,50 RUNCOIIIP COMP
13:00 - 14:00 1.00 RUNCOIIIP COMP
14:00 - 15:00 1,00 RUNCOIIIP COMP
15:00 - 16:30 1,50 RUNCOIIIP COMP
16:30 - 17:30 1,00 RUNCOIIIP COMP
17:30 - 18:30 1,00 RUNCOIIIP COMP
18:30 - 21 :00
2.50 RUNCOIIIP
COMP
21 :00 - 22:30
1.50 RUNCOIIIP
COMP
Start:
Rig Release:
Rig Number:
Spud Date: 10/10/2003
End:
10/10/2003
10/21/2003
Description of Operations
jts 4,5 12,6# slotted liner and 6 jts 4.5, 12.6#, L-80 solid liner w/
two centralizers per jt. total of 87 jts, 3,538 ft, Baker hook wall
hanger
Tripping in with liner, Took two trys to get out window, hook
hanger on 2nd try, liner up wt 145k down wt 85k, shoe @
11044 top of liner 7482
Drop ball pump down @ 1.5 bbls min, release from liner
3200psi, pickup to verify release, lost 25K, shear ball with 4200
psi
Tripping out, laying down excess drlg pipe, and running tools,
clear floor
Pick up Johnny Wacker and tripped in to 7464'
Circ two bottoms up 10 bbls min 2550 psi, 100 rpms
Displace hole with 8.8 brine, displace brine with 9.2 Brine w/
corrosion inhibitor @ 10 bbls min, 2550 psi, 100 rpms
Laying down drill pipe
Pull wear ring, rig up to run tubing, count pipe
PJSM - Ran 3-1/2" tail pipe assembly, Baker S-3 Packer,
Phoenix Jet Pump Gauge Sensor, 4-1/2" XD Dura Sliding
Sleeve and Phoenix Discharge Pressure Gauge with I-wire.
Continued running 4,5" completion with I-Wire and Cannon
Clamps on every joint. - Total joints ran 1734,5" L-80 12,6#
IBT tubing - Pick up and make up landing jt and hanger - make
up I-wire to hanger and test. PU weight 106K SO weight 90K,
176 Cannon Clamps installed.
Land tubing hanger. RILDS, Dropped Prong w/ Rollers. Rigged
up to pump down tubing to set packer.
Pressured up on tubing to 4000 psi to set slips and element on
hanger. Pressure decreased from 4000 psi to 3680 psi in 5
minutes. Bleed off pressure, Tested 7-5/8" X 4-1/2" annulus to
500 psi. Good test.
Backed out landing joint. Installed 1WC with dry rod. Installed
Landing joint and test 1WC to 1000 psi. Good Test.
Lay down landing jt. clear floor
Nipple down BOPS
Nipple up 4 1/16 Tree and FMC 11" X 4 1/16 adapter. run
control line tru and test same, Test adapter to 5,000 psi, test
tree cavity to 4,000 psi
Rig up Lubricator, pill1WC, rig up First Energy pump truck
Test TBG to 4,000 psi, leaking at 100 psi per min., bleed to
1,150 psi after 30 min., no movement in annulus, PX plug
leaking ?, pressure TBG up to 3,000 psi and test Annulus to
4,500 psi for 10 min., packer holding, shear DCK valve when
pressure in TBG bleed down to 2,000 psi.
Pump 75 bbls of diesel down annulus with First Energy 2 bbls
min. 1,200 psi, rig up and U-Tube to TBG, freeze protection to
1 800 ft
Install BPV and test to 1000 psi, secure Tree
Rig release to move to MPK-21A @ 22.30 hrs 10/2102003
Printed, 10/27/2003 11:34:16AM
Legal Name:
Common Name:
Test Date
-.-
10/16/2003
MPS-01 L2
MPS-01 L2
Test Type
Test Depth (TMP)
7,521.0 (ft)
FIT
BP AMOCO
Leak-Off Test Summary
Test Depth (TVD)
4,225.0 (ft)
AMW
9,50 (ppg)
Surface Pressure i Leak Off Pressure (BHP) :
350 (psi) 2,435 (psi)
Page 1 of 1
EMW
...-.......--
11.09 (ppg)
.
.
Printed: 1012712003 11:34:05AM
.
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-01 L2
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
9,936.16' MD
9,987.58' MD
11,075.00' MD
(if applicable)
.
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
~~~\)-\~
~03-lfÞl
15-Nov-03
h. ..~,
<.',
:\.
DEe 08 2003
Alaska I;,
AnCl¡Oftì!;ie
.
.
Survey Ref: svy1300
Halliburton Sperry-Sun
Milne Point Unit
BPXA
Milne Point MPS
MPS-01L2
Job No. AKZZ0002714264, Surveyed: 19 October, 2003
Survey Report
7 November, 2003
Your Ref: API 500292314161
Surface Coordinates: 6000044.6,5 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid)
Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True)
Kelly Bushing Elevation: 71.90ft above Mean Sea Level
Kelly Bushing Elevation: 71.90ft above Project V Reference
Kelly Bushing Elevation: 71.90ft above Structure
spe............y-suil'1
DR I L. L.ING^^'se AV I c: IE S
A Halliburton Company
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01L2
Your Ref: API 500292314161
Job No. AKZZ0002714264, Surveyed: 19 October, 2003
BP EXPLORA nON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9936,16 90.430 322.130 4180,22 4252,12 5523.89 N 4629.24 E 6005609.28 N 570657.12 E 7127.36 Tie On Point
9987,58 88.950 323.330 4180,50 4252.40 5564.80 N 4598.10 E 6005649,92 N 570625.62 E 3,705 7146.03 Window Point
10033.43 87.160 322.120 4182.05 4253,95 5601.27 N 4570.35 E 6005686.13 N 570597.55 E 4.711 7162.67
10083.89 88.640 322.060 4183.90 4255.80 5641 .05 N 4539.37 E 6005725.64 N 570566.21 E 2.935 7180.47
10129.17 90.120 320.570 4184,39 4256,29 5676.39 N 4511.07 E 6005760.73 N 570537.60 E 4,638 7195.86 .
10180.15 90.430 321.160 4184.15 4256.05 5715,93 N 4478.89 E 6005799,98 N 570505.08 E 1.307 7212.83
10226.22 89.880 319.980 4184.02 4255.92 5751.52 N 4449.63 E 6005835.31 N 570475,51 E 2.826 7227.93
10277,04 90.000 319.390 4184.08 4255,98 5790.27 N 4416.75 E 6005873.77 N 570442.28 E 1.185 7243,85
10322.06 90.000 320.140 4184.08 4255.98 5824,63 N 4387.67 E 6005907.87 N 570412.90 E 1,666 7258.01
10377.13 90.120 319.880 4184.02 4255.92 5866,83 N 4352.28 E 6005949.75 N 570377,14 E 0.520 7275.56
10418.73 90.190 320.440 4183.91 4255.81 5898,77 N 4325.63 E 6005981.46 N 570350,21 E 1.357 7288.92
10469.09 91.290 322.500 4183.26 4255.16 5938.16 N 4294.27 E 6006020.57 N 570318.49 E 4.637 7306,17
10514.53 91.420 322.470 4182.18 4254.08 5974.19 N 4266.60 E 6006056.35 N 570290.51 E 0.294 7322.49
10565.54 91.420 322,340 4180.92 4252.82 6014.60 N 4235.49 E 6006096.48 N 570259.05 E 0.255 7340.75
10611.45 91.360 322.200 4179.80 4251.70 6050.90 N 4207.41 E 6006132.53 N 570230.64 E 0.332 7357.07
10660.29 91.230 322.680 4178.70 4250.60 6089,60 N 4177.64E 6006170,97 N 570200.53 E 1.018 7374.58
10705.25 91.670 323.110 4177.56 4249.46 6125.45 N 4150,53 E 6006206.58 N 570173.10 E 1,368 7391.03
10756.35 91.170 322.490 4176.30 4248.20 6166.14 N 4119,64E 6006246.99 N 570141.86 E 1.558 7409.64
10801 .48 91.540 321,310 4175.23 4247.13 6201 .64 N 4091.80 E 6006282.25 N 570113.71 E 2,739 7425.42
10849.47 91,300 321.570 4174.04 4245.94 6239.16 N 4061.90 E 6006319.50 N 570083.47 E 0.737 7441.84
10897.73 91,230 320.770 4172,97 4244,87 6276.74 N 4031.65 E 6006356,81 N 570052.89 E 1.664 7458.13
10948.20 90.680 321.650 4172.13 4244.03 6316.07 N 4000.03 E 6006395.87 N 570020.93 E 2.056 7475,21 .
10994.18 90.560 320.710 4171,64 4243.54 6351.89 N 3971.21 E 6006431 .43 N 569991,79 E 2.061 7490,75
11004.62 90,430 320.970 4171.55 4243.45 6359.99 N 3964,62 E 6006439.47 N 569985.13 E 2.784 7494,22
11075.00 90.430 320.970 4171.02 4242.92 - 6414.66 N 3920.30 E 6006493,74 N 569940.33 E 0.000 7517,75 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North,
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 31.430° (True).
Magnetic Declination at Surface is 25.1700 (12-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 11075.00ft.,
The Bottom Hole Displacement is 7517.75ft., in the Direction of 31.4310 (True).
7 November, 2003 - 13:42 Page 2 of 3 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01L2
Your Ref: API 500292314161
Job No. AKZZ0002714264, Surveyed: 19 October, 2003
BP EXPLORA nON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
9936.16
4252.12
5523.89 N
4629.24 E Tie On Point
.
9987.58
11075.00
4252.40
4242.92
5564.80 N
6414.66 N
4598.10 E Window Point
3920.30 E Projected Survey
Survey tool program for MPS-01 L2
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
245.00
0.00 245.00
244.99 11075.00
244.99 AK-1 BP _HG (MPS-01 PB1 Gyro)
4242.92 AK-6 BP _IFR-AK (MPS-01 PB1)
.
7 November, 2003 - 13:42
Page 3 of 3
DrillQuest 3.03.05.005
.
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
.
Re: Distribution of Survey Data for Well MPS-01 L2 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
9,936.16' MD
9,987.58' MD
11,075.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
K~'\'\\\'- ~
,~ð:3 ~) !.o I
15-Nov-03
RECEIVED
DEC 082003
Aj,;¡ska on & Gas Cons, CommiS8i0n
Anchorage
.
Halliburton Sperry-Sun
Milne Point Unit
BPXA
Milne Point MPS
MPS-01 L2 MWD
12 October, 2003
Job No. AKMW0002714264, Surveyed:
Survey Report
2003
7 November,
.
Your Ref: API 500292314161
Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Survey Ref: svy1301
Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid)
Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True)
Kelly Bushing Elevation: 71.90ft above Mean Sea Level
Kelly Bushing Elevation: 71.90ft above Project V Reference
Kelly Bushing Elevation: 71.90ft above Structure
spe""''''''y-SUil'1
DAiL.L.ING sieAVIc:es
A Halliburton Company
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01L2 MWD
Your Ref: API 500292314161
Job No. AKMW0002714264, Surveyed: 12 October, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9936,16 90.430 323.420 4180.33 4252.23 5539.84 N 4640.43 E 6005625.33 N 570668.17 E 7146.81 Tie On Point
9987.58 88.950 324.570 4180.60 4252.50 5581.44 N 4610.21 E 6005666,66 N 570637.58 E 3.645 7166,54 Window Point
10033.43 87.160 323.480 4182.16 4254,06 5618.52 N 4583.29 E 6005703.50 N 570610.33 E 4.570 7184.15
10083.89 88.640 323,270 4184.01 4255.91 5658.99 N 4553,21 E 6005743.70 N 570579.90 E 2.962 7202.99
10129.17 90,120 322.200 4184.50 4256.40 5695.02 N 4525.80 E 6005779.49 N 570552.16 E 4,033 7219.44 .
10180,15 90.430 322.650 4184.25 4256.15 5735.42 N 4494.71 E 6005819.62 N 570520.72 E 1.072 7237.71
10226.22 89.880 321.400 4184.13 4256.03 5771.74 N 4466.36 E 6005855.68 N 570492.05 E 2.964 7253.91
10277.04 90.000 320.710 4184.18 4256,08 5811,26 N 4434.42 E 6005894,92 N 570459.76 E 1,378 7270.98
10322.06 90.000 321,360 4184.18 4256.08 5846.27 N 4406.11 E 6005929.67 N 570431 .14 E 1 .444 7286.08
10377.13 90.120 321,100 4184.13 4256,03 5889.20 N 4371.62 E 6005972.30 N 570396,28 E 0.520 7304,74
10418.73 90.190 321,140 4184.01 4255.91 5921.59 N 4345,51 E 6006004.45 N 570369.88 E 0.194 7318.76
10469.09 91.290 323.000 4183.36 4255.26 5961,31 N 4314.56 E 6006043.89 N 570338.58 E 4.291 7336,50
10514.53 91 .420 322.920 4182.29 4254.19 5997.57 N 4287.19 E 6006079.91 N 570310.90 E 0.336 7353.18
10565.54 91 .420 322.540 4181.02 4252.92 6038.15 N 4256,31 E 6006120.22 N 570279.66 E 0.745 7371.70
10611.45 91.360 322.500 4179.91 4251.81 6074,57 N 4228,39 E 6006156,39 N 570251.41 E 0.157 7388,21
10660.29 91.230 322.720 4178.81 4250.71 6113.36 N 4198.74 E 6006194.92 N 570221.42 E 0.523 7405.86
10705.25 91.670 323.080 4177.67 4249.57 6149.21 N 4171.63 E 6006230,53 N 570193.99 E 1.264 7422.31
10756.35 91,170 322.880 4176.40 4248.30 6190.00 N 4140.87 E 6006271.04 N 570162.87 E 1.054 7441.07
10801.48 91.540 322.320 4175.34 4247.24 6225.84 N 4113.46 E 6006306,64 N 570135.15 E 1 .487 7457.36
10849.47 91.300 322.330 4174.15 4246.05 6263,81 N 4084.14 E 6006344.35 N 570105.50 E 0.501 7474.47
10897,73 91.230 321.760 4173,08 4244.98 6301.85 N 4054.47 E 6006382,13 N 570075.49 E 1.190 7491.46
10948.20 90.680 322,620 4172,24 4244.14 6341.72 N 4023.53 E 6006421.72 N 570044.20 E 2.022 7509,35 .
10994,18 90.560 321,830 4171.74 4243.64 6378.06 N 3995.37 E 6006457,81 N 570015.71 E 1.738 7525.67
11004,62 90.430 322.420 4171.65 4243.55 6386,30 N 3988.96 E 6006465,99 N 570009.23 E 5,787 7529.36
11075.00 90.430 322.420 4171.12 4243.02 6442.08 N 3946.04 E 6006521.39 N 569965.82 E 0.000 7554.57 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North,
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 31.430° (True).
Magnetic Declination at Surface is 25.170° (12-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 11075.00ft.,
The Bottom Hole Displacement is 7554.57ft., in the Direction of 31.489° (True).
7 November, 2003 - 13:43 Page 2 of 3 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01L2 MWD
Your Ref: API 500292314161
Job No. AKMW0002714264, Surveyed: 12 October, 2003
BP EXPLORA nON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
9936.16
4252.23
5539.84 N
4640.43 E Tie On Point
.
9987.58
11075.00
4252.50
4243,02
5581.44 N
6442.08 N
4610.21 E Window Point
3946.04 E Projected Survey
Survey tool program for MPS-01 L2 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0,00
245.00
0,00 245.00
244.99 11075.00
244.99 AK-1 BP _HG (MPS-01 PB1 Gyro)
4243.02 MWD Magnetic (MPS-01 PB1 MWD)
.
7 November, 2003 - 13:43
Page 3 of 3
DrillQuest 3.03.05.005
.
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
.
Re: Distribution of Survey Data for Well MPS-01 L2 PB1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
7,241.36' MD
7,487.00' MD
10,393.00' MD
(if applicable)
d03-I(Q~
15-Nov-03
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
K~~\"~
RECE!VE[)
DEC 08 2003
AJ_a OIî & Gas Cons. Commission
Anchorage
Halliburton Sperry-Sun
Milne Point Unit
SPXA
Milne Point MPS
MPS-01L2 PS1
.
Job No. AKZZ0002714264, Surveyed: 18 October, 2003
Survey Report
14 November, 2003
Your Ref: API 500292314171
Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid)
Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True)
Kelly Bushing Elevation: 71.90ft above Mean Sea Level
Kelly Bushing Elevation: 71.90ft above Project V Reference
Kelly Bushing Elevation: 71.90ft above Structure
spel'""'I'""'Y-SUI'1
é R I: I... 1...1 NG 5 ERyn::::^eS
A Halliburton Company
Survey Ref: svy1298
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01L2 PB1
Your Ref: API 500292314171
Job No. AKZZ0002714264, Surveyed: 18 October, 2003
BP EXPLORA nON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7421.36 58.440 37.430 4116,37 4188.27 3279.15 N 4429.47 E 6003362.86 N 570477.21 E 5107.80 Tie On Point
7487.00 59.720 36.460 4150.10 4222.00 3324.16 N 4463.31 E 6003408.17 N 570510.66 E 2.326 5163.85 Window Point
7533.37 66.810 36.950 4170,95 4242.85 3357.34 N 4488.05 E 6003441 .56 N 570535.10 E 15,319 5205.06
7584.18 77.510 37.430 4186.49 4258.39 3395.81 N 4517.25 E 6003480,29 N 570563.96 E 21.078 5253.12
7630,32 87.590 37,830 4192.47 4264.37 3431.99 N 4545.15 E 6003516.72 N 570591.54 E 21.863 5298.54 .
7678.19 95.000 38,770 4191.39 4263,29 3469,52 N 4574,79 E 6003554.51 N 570620.84 E 15.603 5346.02
7726.98 94.130 38.920 4187.50 4259.40 3507.40 N 4605.29 E 6003592.66 N 570651,01 E 1.809 5394.25
7776,70 95.930 34.850 4183.14 4255.04 3547.01 N 4635.01 E 6003632.52 N 570680.38 E 8.922 5443.54
7823.69 95,870 36.290 4178.31 4250.21 3585.02 N 4662,20 E 6003670,78 N 570707.23 E 3.051 5490,16
7874,10 91,730 32.960 4174.97 4246.87 3626.40 N 4690.77 E 6003712.41 N 570735.43 E 10.530 5540.36
7920.05 91.910 32.800 4173.51 4245.41 3664,97 N 4715.70 E 6003751.20 N 570760.02 E 0.524 5586.27
7967.12 91.600 31.450 4172.07 4243.97 3704,82 N 4740.72 E 6003791.26 N 570784.69 E 2.941 5633,32
8016.01 90,190 26.760 4171.31 4243.21 3747.51 N 4764.49 E 6003834.17 N 570808.08 E 10,016 5682,14
8064.17 90,560 23.450 4170.99 4242.89 3791.12N 4784.92 E 6003877.95 N 570828,12 E 6,916 5730,00
8113,05 89.080 20,000 4171.14 4243.04 3836.52 N 4803.01 E 6003923.51 N 570845,81 E 7.680 5778.18
8161.58 89.570 17.200 4171,72 4243.62 3882,50 N 4818.49 E 6003969.63 N 570860.88 E 5.857 5825.49
8205.00 89.880 18.370 4171.92 4243.82 3923.85 N 4831,75 E 6004011.09 N 570873,77 E 2,788 5867,68
8254.28 88.830 17.250 4172.48 4244.38 3970.76 N 4846.82 E 6004058.14 N 570888.43 E 3,115 5915.57
8302.15 87.160 15,320 4174,15 4246,05 4016.68 N 4860.23 E 6004104.17 N 570901.44 E 5.330 5961.74
8353.97 87.600 16.070 4176.52 4248.42 4066.51 N 4874.24 E 6004154.13 N 570915.00 E 1,677 6011,57
8398.35 87.230 13,900 4178.52 4250.42 4109.34 N 4885,70 E 6004197,05 N 570926,08 E 4,955 6054.09
8448.78 88.950 16.410 4180.21 4252.11 4157.98 N 4898.88 E 6004245,81 N 570938.83 E 6.031 6102.46 .
8494.82 88.890 16.330 4181.07 4252.97 4202.15 N 4911.85 E 6004290.09 N 570951.41 E 0.217 6146.92
8546,15 89,070 16.820 4181.99 4253.89 4251.34 N 4926.49 E 6004339.41 N 570965,61 E 1.017 6196.52
8590.80 89.320 17.060 4182.61 4254.51 4294.05 N 4939.50 E 6004382.23 N 570978.24 E 0.776 6239.75
8642.22 88,640 15.560 4183.53 4255.43 4343,39 N 4953.94 E 6004431.69 N 570992.25 E 3,202 6289.38
8687.67 88.520 14.180 4184.66 4256.56 4387.30 N 4965,60 E 6004475,71 N 571003,52 E 3.047 6332.93
8736,73 88.950 13.440 4185.74 4257,64 4434.93 N 4977.30 E 6004523.44 N 571014.80 E 1.744 6379,67
8782.59 89.510 14.860 4186.36 4258.26 4479.39 N 4988,51 E 6004568,00 N 571025.62 E 3.328 6423.46
8833.30 89.510 12.080 4186.79 4258,69 4528.70 N 5000.32 E 6004617.41 N 571036.99 E 5.482 6471,69
8878.56 90.180 9.400 4186.91 4258.81 4573.16 N 5008.76 E 6004661.95 N 571045.03 E 6.104 6514,03
8929.67 90,800 5.930 4186.47 4258.37 4623,81 N 5015.57 E 6004712.65 N 571051.40 E 6.897 6560.80
8974,62 90.370 2.810 4186.02 4257.92 4668.62 N 5019.00 E 6004757.49 N 571054.43 E 7.006 6600.82
9026.13 90,680 359.180 4185.54 4257.44 4720,11 N 5019.89 E 6004808,99 N 571054.87 E 7,073 6645.22
9071,29 89,880 355,320 4185.32 4257.22 4765.21 N 5017.73 E 6004854.06 N 571052.30 E 8.729 6682.57
14 November, 2003 - 10:10 Page 2 of 4 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01 L2 PS1
Your Ref: API 500292314171
Job No. AKZZ0002714264, Surveyed: 18 October, 2003
SP EXPLORATION (ALASKA) INC. SPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft)
9121.70 88.150 348.490 4186.19 4258.09 4815.08 N 5010.63 E 6004903.87 N 571044.77 E 13.974 6721.43
9168.28 88.460 344.130 4187,57 4259.47 4860,30 N 4999.62 E 6004949.00 N 571033.35 E 9.380 6754,27
9218.34 89.200 345.280 4188.59 4260.49 4908.58 N 4986.41 E 6004997,15 N 571019.72 E 2.731 6788.58
9264.27 89.260 342.640 4189.21 4261,11 4952.71 N 4973,73 E 6005041.17 N 571006.64 E 5.749 6819.62 .
9314.11 89.140 338.490 4189.90 4261,80 4999.70 N 4957.15 E 6005088.01 N 570989.65 E 8,329 6851.07
9359.86 88,890 336.900 4190.69 4262.59 5042.02 N 4939.79 E 6005130.17 N 570971.92 E 3.518 6878.13
9410.19 90.800 334.420 4190.83 4262.73 5087.87 N 4919.05 E 6005175.84 N 570950.77 E 6,219 6906.43
9455.90 90.190 334.250 4190.43 4262.33 5129.07 N 4899,25 E 6005216.86 N 570930.61 E 1.385 6931.26
9506.09 92.530 332.500 4189.24 4261 .14 5173.92 N 4876.77 E 6005261.51 N 570907.73 E 5,821 6957.81
9551.78 93.330 332.900 4186.91 4258.81 5214.46 N 4855.84 E 6005301.87 N 570886.44 E 1,957 6981.50
9602.91 92.530 329.430 4184.29 4256.19 5259,19 N 4831.21 E 6005346.38 N 570861.43 E 6,956 7006.82
9648.48 91.360 325.630 4182.74 4254.64 5297.61 N 4806.77 E 6005384.57 N 570836.64 E 8.720 7026.85
9699.04 90.490 321,920 4181.93 4253.83 5338.38 N 4776.90 E 6005425,08 N 570806.41 E 7.536 7046,07
9744,59 90.430 321.420 4181.56 4253.46 5374.11 N 4748.65 E 6005460,56 N 570777.85 E 1.106 7061.82
9795.43 90.370 321,000 4181,21 4253.11 5413.74 N 4716.80 E 6005499.90 N 570745.65 E 0.834 7079.03
9840.20 89.690 320.690 4181.18 4253.08 5448.45 N 4688.53 E 6005534.37 N 570717,08 E 1.669 7093.91
9890.72 91.110 322,290 4180.83 4252.73 5487.98 N 4657,08 E 6005573.62 N 570685.27 E 4,234 7111.24
9936.16 90.430 322.130 4180.22 4252.12 5523.89 N 4629.24 E 6005609.28 N 570657,12 E 1.537 7127.36
9986.86 92.710 322.190 4178.83 4250.73 5563.91 N 4598,15 E 6005649.02 N 570625.67 E 4.499 7145.29
10032.84 92.340 322.640 4176.81 4248,71 5600,31 N 4570.13 E 6005685.17 N 570597.34 E 1.266 7161.74
10083.34 92.650 322.710 4174.61 4246.51 5640.43 N 4539.54 E 6005725.02 N 570566,39 E 0.629 7180.03 .
10129.21. 92.100 322.390 4172.71 4244.61 5676.81 N 4511.67 E 6005761.16 N 570538.20 E 1.387 7196.54
10179.95 94.200 322.540 4169.92 4241.82 5716.99 N 4480.81 E 6005801.05 N 570506,98 E 4.149 7214.72
10225,56 93.580 322.230 4166.82 4238.72 5753.03 N 4453.03 E 6005836.85 N 570478.89 E 1.519 7231.00
10276.59 96,300 321.830 4162.43 4234.33 5793.11 N 4421,76 E 6005876.65 N 570447.26 E 5.387 7248.88
10323.02 95.800 320.680 4157.54 4229.44 5829.12 N 4392.86 E 6005912.40 N 570418.05 E 2.688 7264.54
10393,00 95.800 320.680 4150.46 4222.36 5882.98 N 4348.75 E 6005965.87 N 570373.46 E 0.000 7287.50 Projected Survey
All data is in Feet (US Survey) unless otherwise stated, Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 31.430° (True).
Magnetic Declination at Surface is 25.170° (12-0ct-03)
14 November, 2003 - 10:10 Page 3 of 4 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01 L2 PB1
Your Ref: API 500292314171
Job No. AKZZ0002714264, Surveyed: 18 October, 2003
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
Based upon Minimum Curvature type calculations, at a Measured Depth of 10393.00ft.,
The Bottom Hole Displacement is 7315.81ft., in the Direction of 36.472° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
.
7421.36
7487.00
10393.00
4188.27
4222.00
4222.36
3279.15 N
3324.16 N
5882.98 N
4429.47 E
4463.31 E
4348.75 E
Tie On Point
Window Point
Projected Survey
Survey tool program for MPS-01/? PB1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
245.00
0.00 245,00
244.99 10393.00
244.99 AK-1 BP _HG (MPS-01 PB1 Gyro)
4222.36 AK-6 BP _IFR-AK (MPS-01 PB1)
.
14 November, 2003 - 10:10
Page 4 of 4
DrillQuest 3.03.05.005
.
AOGCC
Howard Okland
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
.
@.03 -/ &f
15-Nov-03
Re: Distribution of Survey Data for Well MPS-01 L2 PB1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies.
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
7,241.36' MD
7,487.00' MD
10,393.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
AUachment(s)
~~\\\'~
~%¡r.·;;r~E· . 'VED
,,\11-"'-' I
DEC 08 2003
Ala5ka on &. Gas Cons. commiØ}n
Anchor~e
Halliburton Sperry-Sun
Milne Point Unit
BPXA
Milne Point MPS
MPS-01L2 PB1 MWD
.
Job No. AKMW0002714264, Surveyed: 18 October, 2003
Survey Report
14 November, 2003
Your Ref: API 500292314171
Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid)
Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True)
Kelly Bushing Elevation: 71.90ft above Mean Sea Level
Kelly Bushing Elevation: 71.90ft above Project V Reference
Kelly Bushing Elevation: 71.90ft above Structure
Sp:E!i'i'Y-SUI'1
DRIL.L.ING'SERVlces
A Halliburton Company
Survey Ref: svy1299
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01 L2 PB1 MWD
Your Ref: API 500292314171
Job No. AKMW0002714264, Surveyed: 18 October, 2003
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7421.36 58.440 35,930 4116.48 4188.38 3290.99 N 4418.92 E 6003374.61 N 570466.56 E 5112.40 Tie On Point
7487.00 59.720 36.460 4150.20 4222.10 3336.43 N 4452.17 E 6003420.34 N 570499.41 E 2.069 5168.52 Window Point
7533.37 66.810 36.950 4171.05 4242.95 3369.61 N 4476.91 E 6003453.74 N 570523,86 E 15.319 5209.73
7584.18 77.510 34.790 4186.60 4258.50 3408.76 N 4505.19 E 6003493.14 N 570551,78 E 21.443 5257,88
7630.32 87.590 38.090 4192,57 4264.47 3445.50 N 4532.34 E 6003530.12 N 570578.61 E 22,966 5303.39 .
7678.19 95.000 39.090 4191.49 4263.39 3482.89 N 4562.17 E 6003567.76 N 570608.10 E 15.619 5350.84
7726.98 94.130 39.390 4187.61 4259.51 3520.55 N 4592,93 E 6003605.70 N 570638.53 E 1.886 5399.02
7776.70 95.930 35.270 4183.25 4255.15 3559.92 N 4622,96 E 6003645,34 N 570668.21 E 9.013 5448.28
7823.69 95.870 37.000 4178.42 4250.32 3597.67 N 4650.52 E 6003683,33 N 570695.44 E 3.664 5494.86
7874.10 91.730 33,280 4175.08 4246,98 3638,79 N 4679.46 E 6003724.70 N 570724.01 E 11.029 5545.03
7920.05 91.910 33.050 4173.62 4245.52 3677.24 N 4704.58 E 6003763,36 N 570748.79 E 0.635 5590.94
7967.12 91.600 31.800 4172.18 4244,08 3716.95 N 4729.81 E 6003803,30 N 570773.67 E 2.735 5637.98
8016.01 90.190 27.670 4171.41 4243.31 3759.39 N 4754.05 E 6003845.95 N 570797,53 E 8.925 5686.83
8064.17 90.560 26.040 4171.10 4243.00 3802.35 N 4775.80 E 6003889,10 N 570818.90 E 3.471 5734.83
8113.05 89.080 20.600 4171.25 4243.15 3847.22 N 4795.14 E 6003934.14 N 570837,85 E 11 .533 5783.20
8161,58 89.570 18,430 4171.82 4243.72 3892,95 N 4811.35 E 6003980.02 N 570853,65 E 4.584 5830,68
8205.00 89.880 19.280 4172.03 4243.93 3934.04 N 4825.38 E 6004021.23 N 570867,32 E 2,084 5873.06
8254,28 88.830 17,930 4172.58 4244.48 3980.74 N 4841.11 E 6004068.07 N 570882,63 E 3.470 5921,11
8302.15 87.160 16,350 4174.26 4246.16 4026.46 N 4855.20 E 6004113.90 N 570896.32 E 4.801 5967.46
8353,97 87.600 16.740 4176.63 4248.53 4076.08 N 4869.95 E 6004163.65 N 570910.62 E 1,134 6017.49
8398.35 87.230 13.940 4178.63 4250.53 4118.83 N 4881.67 E 6004206.51 N 570921.97 E 6,358 6060.09 .
8448.78 88.950 16,880 4180.31 4252.21 4167.41 N 4895.06 E 6004255.21 N 570934.93 E 6.751 6108,52
8494.82 88.890 16,180 4181.18 4253.08 4211.54 N 4908.16 E 6004299.45 N 570947,64 E 1,526 6153.01
8546.15 89.070 17,360 4182.09 4253.99 4260.68 N 4922.97 E 6004348.72 N 570962.01 E 2.325 6202.66
8590.80 89,320 17.390 4182,72 4254.62 4303.29 N 4936.30 E 6004391.44 N 570974.97 E 0.564 6245.97
8642.22 88,640 15.860 4183.64 4255.54 4352,55 N 4951,01 E 6004440.83 N 570989.24 E 3.256 6295.67
8687.67 88.520 14.350 4184.76 4256.66 4396.41 N 4962,85 E 6004484,80 N 571000,69 E 3.332 6339.27
8736.73 88,950 13.530 4185.85 4257.75 4444.02 N 4974,67 E 6004532.50 N 571012.08 E 1.887 6386.05
8782.59 89.510 14,310 4186.46 4258.36 4488.52 N 4985,70 E 6004577.11 N 571022.72 E 2.094 6429.78
8833.30 89.510 12,390 4186.90 4258.80 4537.86 N 4997.40 E 6004626.55 N 571033.99 E 3.786 6477.99
8878,56 90.180 9.770 4187.02 4258.92 4582.27 N 5006.10 E 6004671,03 N 571042.30 E 5.975 6520.42
8929.67 90.800 6.530 4186.58 4258.48 4632.86 N 5013.35 E 6004721.68 N 571049.09 E 6.454 6567.36
8974,62 90.370 3.060 4186.12 4258.02 4677.64 N 5017.10 E 6004766.49 N 571052.45 E 7,778 6607.53
9026.13 90.680 359,510 4185.65 4257.55 4729.13 N 5018.26 E 6004817,99 N 571053.15 E 6.918 6652.06
9071.29 89.880 355.890 4185.43 4257.33 4774.24 N 5016.45 E 6004863.09 N 571050.94 E 8.209 6689.61
14 November, 2003 - 10:12 Page 2 of 4 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01 L2 PB1 MWD
Your Ref: API 500292314171
Job No. AKMW0002714264, Surveyed: 18 October, 2003
BP EXPLORA nON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9121.70 88.150 349.280 4186.30 4258.20 4824.19 N 5009.95 E 6004912.98 N 571044.00 E 13.552 6728.85
9168.28 88.460 344.800 4187.67 4259.57 4869.56 N 4999.51 E 6004958.25 N 571033.16 E 9.637 6762.11
9218.34 89.200 345,790 4188.70 4260.60 4917.97 N 4986.80 E 6005006.54 N 571020,03 E 2.469 6796,79
9264.27 89.260 343,190 4189.31 4261.21 4962.21 N 4974.52 E 6005050,68 N 571007.36 E 5.662 6828,15
9314.11 89.140 339.280 4190.01 4261.91 5009.39 N 4958.49 E 6005097.71 N 570990.91 E 7,848 6860.04 .
9359,86 88,890 337.880 4190.80 4262.70 5051.97 N 4941.79 E 6005140.15 N 570973.83 E 3.108 6887.67
9410.19 90.800 335.000 4190.93 4262.83 5098.10 N 4921,67 E 6005186,10 N 570953.31 E 6,866 6916.54
9455.90 90.190 335.020 4190.54 4262.44 5139.53 N 4902.36 E 6005227.35 N 570933.63 E 1.335 6941.82
9506.09 92.530 333.670 4189.35 4261.25 5184.76 N 4880.64 E 6005272.38 N 570911.51 E 5,382 6969.08
9551.78 93.330 333.990 4187.01 4258.91 5225.71 N 4860.52 E 6005313.16 N 570891.03 E 1.885 6993.53
9602.91 92.530 330.420 4184.40 4256.30 5270.87 N 4836.71 E 6005358.11 N 570866.82 E 7.146 7019.65
9648.48 91.360 326,810 4182,85 4254.75 5309.74 N 4813.00 E 6005396.77 N 570842.76 E 8.323 7040.46
9699.04 90.490 322.990 4182.03 4253.93 5351.10 N 4783.93 E 6005437.86 N 570813.33 E 7.748 7060.59
9744,59 90.430 322.660 4181.67 4253.57 5387.39 N 4756.41 E 6005473.91 N 570785.49 E 0.736 7077,20
9795.43 90.370 321.970 4181.31 4253.21 5427.62 N 4725.33 E 6005513.87 N 570754.06 E 1,362 7095,33
9840.20 89.690 322.510 4181.29 4253.19 5463.02 N 4697.92 E 6005549.02 N 570726.33 E 1,940 7111,23
9890.72 91.110 323.450 4180.94 4252.84 5503.35 N 4667.50 E 6005589.08 N 570695.56 E 3.371 7129.79
9936.16 90.430 323.420 4180.33 4252.23 5539.84 N 4640.43 E 6005625.33 N 570668,17 E 1 .498 7146,81
9986.86 92.710 323.300 4178.94 4250.84 5580.51 N 4610.19 E 6005665.73 N 570637.57 E 4.503 7165.74
10032.84 92.340 324.030 4176.91 4248.81 5617.51 N 4582.97 E 6005702.49 N 570610,03 E 1.779 7183.12
10083.34 92.650 323.390 4174.71 4246.61 5658.18 N 4553.11 E 6005742.89 N 570579,81 E 1 .407 7202.25 .
10129,21 92.100 323.410 4172.81 4244.71 5694.97 N 4525.79 E 6005779.44 N 570552.16 E 1.200 7219.39
10179,95 94.200 323.800 4170.02 4241.92 5735.75 N 4495.73 E 6005819.95 N 570521.74 E 4.209 7238.51
10225.56 93.580 322.670 4166.93 4238.83 5772.20 N 4468.49 E 6005856,16 N 570494,18 E 2.821 7255.42
10276.59 96.300 322.120 4162.54 4234.44 5812.48 N 4437.47 E 6005896.16 N 570462.80 E 5.437 7273.61
10323.02 95.800 321.450 4157.64 4229,54 5848.75 N 4408.91 E 6005932.18 N 570433.92 E 1.794 7289.67
10393.00 95,800 321.450 4150.57 4222.47 5903.20 N 4365.52 E 6005986.24 N 570390.05 E 0,000 7313,50 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 31.430° (True).
Magnetic Declination at Surface is 25.170° (12-0ct-03)
14 November, 2003 - 10:12 Page 3 of 4 DrillQuest 3.03.05.005
Halliburton Sperry-Sun
Survey Report for Milne Point MPS - MPS-01 L2 PB1 MWD
Your Ref: API 500292314171
Job No. AKMW0002714264, Surveyed: 18 October, 2003
BP EXPLORA nON (ALASKA) INC.
Milne Point Unit
BPXA
Based upon Minimum Curvature type calculations, at a Measured Depth of 10393,00fl.,
The Bottom Hole Displacement is 7342.04f1., in the Direction of 36.484° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
.
7421.36
7487.00
10393.00
4188.38
4222,10
4222.47
3290.99 N
3336.43 N
5903.20 N
4418.92 E
4452.17 E
4365,52 E
Tie On Point
Window Point
Projected Survey
Survey tool program for MPS-011? PR1 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
245.00
0.00 245.00
244,99 10393.00
244.99 AK-1 BP _HG (MPS-01 PB1 Gyro)
4222.47 MWD Magnetic (MPS-01 PB1 MWD)
.
14 November, 2003 - 10:12
Page 4 of 4
DrillQuest 3.03.05.005
~
. .
c"" t fl1ì 1: ® ~ ® C~ - ~ /Æ / FRANK H. MURKOWSKJ, GOVERNOR
_ _ lill J lnL=olnJ@ - . /
.AI,ASIiA OIL AlQ) GAS /
CONSERVATION COMMISSION /
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE. ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519-6612
Re: Milne Point Unit S-01L2
BP Exploration (Alaska), Inc.
Permit No: 203-169
Surface Location: 3375' NSL, 4714' WEL, Sec. 07, T12N, RIlE, UM
Bottomhole Location: 4525' NSL, 757' WEL, Sec. 06, T12N, RIlE, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
The permit is for a new wellbore segment of existing well MPU S-O 1, Permit No 203-034, API
50-029-23141-00. Production should continue to be reported as a function of the original API
number stated above.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~j~
Commissioner
BY ORDER J}F THE COMMISSION
DATED thisL day of October, 2003
cc: Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
Exploration, Production and Refineries Section
.. STATE OF ALASKA_
ALASKA ~AND GAS CONSERVATION CO~SION
PERMIT TO DRILL
20 MC 25.005
1b. Current Well Class 0 Exploratory
o Stratigraphic Test 0 Service
5. Bond: 181 Blanket 0 Single Well
Bond No. 2S100302630-277
6. Proposed Depth:
MD 11115' . TVD 4145'
7. Property Designation:
ADL 380110
o Drill II Redrill
1 a, Type of work 0 Re-Entry
2, Operator Name:
BP Exploration (Alaska) Inc,
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
3375' NSL, 4714' WEL, SEC. 07, T12N, R11 E, UM .
Top of Productive Horizon:
3981' NSL, 329' WEL, SEC, 06, T12N, R11E, UM'
Total Depth:
4525' NSL, 757' WEL, SEC, 06, T12N, R11E, UM'
4b. Location of Well (State Base Plane Coordinates):
Surface: X-566077 ' y-6000045' Zone;A.SP4
16. Deviated Wells:
Kickoff Depth
7487' ft Maximum Hole Angle
Grade CouplinQ Length MD TVD MD TVD (including stage data)
L-80 BTC 3778' 7337' 4075' 11115' 4145' Uncemented Slotted Liner
Hole
6-1/8"
CasinQ
4-1/2"
Weight
12.6#
~(O(~
II Development Oil D,Multiple Zone
o Development Gas 17Single Zone.Jb
11. Well Name and Number:
MPS-01L2
12. Field I Pool(s):
Milne Point Unit I Schrader Bluff
8. Land Use Permit:
13. Approximate Spud Date:
10/10103
14, Distance to Nearest Property:
4920'
9. Acres in Property:
2560
90°
10. KB Elevation KBE = 15. Distance to Nearest Well Within Pool
(Height above GL): 72,50' feet 1270' away from MPS-07
17. Anticipated pressure (see 20 MC 25,035)
Max. Downhole Pressure: 1801' psig. Max. Surface Pressure: 1379' psig
P6E;SE¡..¡,..WELL CONDITION.SI.)M~lN6~(TQbe.çompl~tø~fòfReârill AND R~øntryQperation$)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): Depth TVD (ft):1
10530(OA), 10515 (OB) 4410 (OA), 4462 (OS) NIA 10530(OA), 10515 (OS) 4410 (OA), 4462 (OS)
Structural
Conductor 78' 20" 260 sx Arctic Set (Approx.) 112' 112'
Surface 3105' 10-3/4" 946 sx PF 'L', 275 sx Class 'G' 3140' 2375'
Intermediate
Production 8136' 7-5/8" 160 sx PF 'E', 293 sx Class 'G' 7685' (OA), 8139' (OS) 4303' (OA), 3585' (OS)
Liner 2580' 4-1/2" Uncemented Slotted Liner 7663' - 10243' (OA) 4296' - 4388' (OA)
Liner (OB) 2629' 4-1/2" Uncemented Slotted Liner 7885' -10514' (OS) 3522' - 4198' (OS)
Perforation Depth MD (ft): 4-1/2" Slotted Liner IPerfOration Depth TVD (ft): 4-1/2" Slotted Liner
7748' - 10200' (OA), 8818' - 10512' (OB) 4317' - 4386' (OA), 4375' - 4462' (OB)
20. Attachments 181 Filing Fee 0 BOP Sketch 181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Property Plat 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 18120 MC 25.050 Requirements
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Pat Archey Title Senior Drilling Engineer
I~Çt"ciy
Permit To Drill . I API Number:
Number: ,2.D~-/~'1 50-029-23141-61-00
Conditions of Approval: Samples Required
Hydrogen Sulfide Measures
Other: :,SOO~~\ ßCJ"?~,
.,.111__ By
~~iLI"
Approved By:
Form 10-401 Revised 3/2003
Date:
Contact Walter Quay, 564-4178
Prepared By Name/Number:
Date IOj'o7jo-S Sondra Stewman, 564-4750
Phone 564-5803
Commission Use Only
16:~~it AP1rozry q ) 0 ,
Mud Log Required
Directional Survey Required
I See cover letter for
other requirements
mes ~o
~Y:s DNa
'7
I
DYes -KNo
DYes .~No
o R \c~l~,ßk
BY ORDER OF
THE COMMISSION
Datestºc9~t
-- _ilne Point MPS-01 L2 Well Permit
IWell Name: I MPS-01 L2
Drill and Complete Plan Summary
I Type of Well (service I producer I injector): I Multi Lateral Producer NE
Surface Location: 1904' FNL, (3375' FSL),' 4714' FEL; (67' FWL), SEC. 7, T12N, R11 E -
E=566076.93 N=6000044.65
Target Location: 3303' FNL, (5140' FSL), 5140' FEL, (140' FWL), SEC. 5, T12N, R11 E
T1 E=570880 N=6003970 Z=4220'TVD
Target Location: 1908' FNL, (3372' FSL), 5132' FEL, (148' FWL), SEC. 5, T12N, R11E
T2 E=570870 N=6005365 Z=4190' TVD
Target Location: 1299' FNL, (3981' FSL), 329' FEL: (4427' FWL), SEC. 6, T12N, R11 E /
T3 E=570385 N=6005970 Z=4170' TVD
Target Location: 755' FNL, (4525' FSL),'757' FEL; (3997' FWL), SEC. 6, T12N, R11 E ""
BHL "NE" Well TD E=569950 N=6006510 Z=4145' TVD
Distance to Property Line 4920'
Distance to Nearest Pool 1270' I MPS-07 ./
I AFE Number: 1 TBD I Rig: I Doyon 14 1
I Estimated Start Date: 110 Oct 2003 I Operating days to complete: 17 1
IMD:111,1151" I TVD: 14145' 1 IMaxlnc: 190 1 I KOP: 17487'1 IKBE: 172.51
1 Well Design (conventional, slimhole, etc.): I Add ML Producer Leg I
I Objective: I Schrader Bluff NE Sand / 1
Mud Program:
6.125-in Production Hole Mud Properties: KCI-CaC03 floPro
Density (ppg) PV YP HTHP pH I API Filtrate I MBT
9.5 10 - 20 25 - 30 10 - 11 9.0 - 9.5 < 6 < 7
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
,¡ Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR.
Cement Program:
Casing Size 4-1/2"
Basis Slotted Liner - No Cementing
Total Cement Wash
NA
Spacer
Lead
Tail
Temp
1
e
Evaluation Program:
6.125-in Hole section:
Open Hole: MWD/GRlRES, ASI, PWD /
IFRlCASANDRA
Cased Hole: N/ A
Formation Markers
Formation Tops
Base Permafrost
TUZC
NA
NB
NC
NE
NF
* Based on SS depths
MDrkb
(ft)
TVDrkb
(ft)
1822
3694
4158
4180
4207
4220
4277
Pore Pressure
(psi)
760
1573
1683
1774
1784
1795
1801 /
Casin~JTubing Program
Hole Size Csg / Wt/Ft Grade Conn
Tbg Q,D,
6.125-in 4.5-in 12.6# L-80 BTC
NE Slotted
_ilne Point MPS-01 L2 Well Permit
Estimated EMW
(Ib/gal)*
8.35
8.35
8.35
8.35
8.35
8.35
8.35
./
Length Top Bottom
MD / rvDrkb MD / rvDrkb
3,778' 7,337' /4075,' 11,115' /4,145'
2
Recommended Bit Program
BHA Hole Size Depth (MD) Bit Type Nozzle/Flow rate
3 6.125-in 7,487' - TD Security FM2643 3-12
e
_ilne Point MPS-01 L2 Well Permit
Well Control:
Intermediate hole:
· Maximum anticipated BHP:
· Maximum surface pressure:
1 ,801-psi @ 4,222-ft TVDrkb - Top of "NE"
1 ,379":psi @ surface
(Based on BHP and a full column of gas from TD @ 0.1-psi/ft)
3,500-psi.
An FIT to 11.0-lb/gal will be made on the 7-5/8" Window
Infinite with 9.5-lb/gal mud.
9.8-lb/gal brine I 7.0-lb/gal Diesel (1 ,800-ft MD).
· Planned BOP test pressure:
· Integrity test:
. Kick tolerance:
· Planned completion fluid:
Drilling Hazards & Contingencies:
Lost Circulation
./
. We do not expect losses while drilling this well.
Expected Pressures
· It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be (8.35 Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled with 9.5-lb/gal mud. ~
Pad Data Sheet
· Please Read the S-Pad Data Sheet thoroughly.
Breathing
. N/A
Hydrocarbons
/
· Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
· Fault #1 , a 10 - 20' DTS is expected at 7490' MD
· Fault #2, a 5 - 10' DTN fault is expected at 8400' MD
· Fault #3, a 5 - 10' DTN fault is expected at 8700' MD
· Fault #4, a 5 - 10' DTS fault is expected at 9350' MD
· Fault #5, a 10 - 20' DTN fault is expected at 9900' MD
Hydrogen Sulfide
· MPS Pad is not designated as an H2S Pad. ./
Anti-collision Issues
· MPS-01 L-2 has no anti-collision issues, other than the main wellbore of MPS-01 and MPS-01
L 1.
3
e
eilne Point MPS-01 L2 Well Permit
DRILL & COMPLETION PROCEDURE
Pre-Riq
1. E-line chemical-cut Premier Packer.
2. Set plug in XN profile in Sliding sleeve (2nd barrier)
Baker 4.5-in Premier Packer Data
· 6.52-ft length
· 46.74-in (3.90-ft) from top of box connection to top of cutting zone
· 21.4-in (1.78-ft) cutting zone
3. 0.355-in thickness of cut required to release packer
Pull Completion
1. MIRU Doyon 14.
2. Nipple down tree.
3. Nipple up 13-5/8" 5M BOPE on 11" 5M casing head. Test annular to 250-psi low and
2,500-psi high, test rams and associated equipment to 250-psi low and 3,500-psi high.
4. Pull BPV,
5. Pull Plug from nipple
6. Displace out produced water and freeze protect fluid with sea water through annulus
valve to tank or truck.
7. Pull and LD tubing hanger and space-out pups.
· Inspect power fluid impingement zone on tubing immediately below hanger.
· Inspect tubing for wear as it is pulled (high solids during production).
8. Pull 4.5-in tubing (use 208-k.lbf joint yield strength with 20% safety factor for 166-k.lbf
maximum over-pull) and stand in derrick to be re-run.
· See attached contingency plan if tubing does not pull.
· Have Schlumberger e-line on standby before beginning to pull tubing.
. Remove I-wire clamps and spool I-wire.
9. LD Packer, Phoenix pressure gauges and sliding sleeve.
10. PU 6.75-in bit, scraper and magnets and RI H on 4.0-in drill pipe to 7,550-ft. Do not
circulate or rotate.
11. POH.
4
e
eilne Point MPS-01 L2 Well Permit
RUN WHIPSTOCK
12. Run and set packer.
13. Pick-up Baker whipstock with MWD for orientation. Orient and set the whipstock BTM
anchor and shear off disconnect as per BOT
14. Mill window (estimated to be 13.5'), CCM, Pull out of hole and LD mills
DRILL PRODUCTION HOLE
15. Drill 6-1/8" horizontal lateral as per directional program. /
PULL WHIPSTOCK
16. Circulate and condition the hole until shakers indicate the hole is clean. POH and lay
down BHA Retrieve whipstock
RUN PRODUCTION LINER
17. Rig up and run 4-1/2" 12.6# slotted liner with Hookwall hanger system
18. Pull out of hole and lay down liner running tool
19. Run in hole with mule shoe guide. Displace floPro with seawater followed by 9.2-lb/gal
NaCI with corrosion inhibitor. POH and lay down excess drill pipe
RUN PRODUCTION TUBING
20. Rig up and run 4-1/2" completion.
21. Install BPV and nipple down the BOPE
22. Nipple up the adapter flange and tree, pull BPV and install TWC. Test tree, Pull TWC.
23. Drop the ball and rod, allow it to gravitate onto the ball seat.
24. Pressure tubing to set the slips, then increase pressure to set the element.
25. Pressure Test tubing.
26. Pressure test the casing and packer (4-1/2" x 7-5/8") annulus.
RIG DOWN AND RELEASE RIG
27. Shear RP valve in the GLM.
28. freeze protect with diesel.
29. Install BPV and test from below.
30. Secure the well and release the rig
5
Iœg;, 4-1/16" - SM FMC _
Wellhead: 11" x 4.S" SM Gen.
w/4.S" TCII T&B Tubing Hanger
4" CIW "H" BPV profile
I
MPS-01~LI
L
20" x 34" insulated, 215 #/ft A-53 ~
103/4" 45,5 ppf L-80 BTRC
(Drift ID = 9,794, cap. = .0961 bpf)
103/4" Super Seal II Float Shoe
I 3140' I ~
7518" 29.7 ppf, L-80, BTRC-mod production casing
(drift ID = 6,750", cap. = 0,0459 bpf)
4.5",12.6#, L-80 IBTtbg.
(cap. = .0152 bpf, id =3.958)
3,5",9.2# L-80 NSCTtbg,
( cap, = ,0087 bpf, id 2.992 )
Reservoir Fluid
Window in 7 -S/8" Casing @ 768S' - 7697'
Well Angle @ window = 73°
on.elev. = 72.50' (Doyon 14)
Ori ,elev,= 38.30' (Doyon 14)
Cameo 4.5" x 1" w/ BK-5 latch
sidepocket KG B-2 GLM
...
KOP @ 400'
53+ degree from 1950'
Max hole angle = 68 degree @ 5060'
58 degree @ Sleeve
4.S" x 3.S" X-Over @ 748S'
No-Go ID of XN nipple 2.7S0" @ 7548'
Phoenix Discharge gauge (3.850 ID)
4.5" HES XD Dura sliding sleeve
NOTE: ID change min. 2.840"
Phoenix gauge ( 2.840" ID) (4060' TVD)
4.5" x 3,5" X-Over
3,5 HES X-Nipple (2,813 ID)
7-5/8" x 3.5" Baker Premier Packer
3.5" HES XN-Nipple
(2.813 packing bore 2.750" No Go ID)
WLEG
Baker Tie Back Sleeve 7662'
Baker Hook Wall
Hanger inside 7" Window 7671'
~--
Hanger outside 7-5/8" Window 7697'
61/8" Hole td @ 10,530'
66 jts. - 4 1/2" R3 Slotted Liner
12,6# L-80 IBT (7,747'-10,199')
OA Upper Lateral
Baker Tie Back Sleeve 7885'
Baker ZXP Liner Top Packer 7,892'
Baker 7-5/8" x 5" HMC Liner Hanger 7 ,898' ~
~
75/8" Halliburton Float Collar 8054'
7518" Halliburton Float Shoe 8139'
r~~\~~»l
Btm Baker 4 1/2" Guide Shoe 10,243'
~
~
61/8" Hole td @ 10,515'
~
OB Lower Lateral 60 jts. - 41/2",12.6# L-80, IBT
Slotted Liner (8,117'-10,512')
DATE
REV, BY
COMMENTS
04/16/03
MDO
Drilled & Completed Doyon 14
Blm Baker 41/2" "V" Float Shoe 10,514'
I 2106' I
I 7437' 1
17,448' I
17,471'1
17,48S' I
I 7,487' I
I 7,498' I
17,s48' I
17,ss4' I
.
Rat Hole
287'
f
MILNE POINT UNIT
WELL 5-01
API NO: 50-029-23141-60 L1
API NO: 50-029-23141-00
BP EXPLORATION (AK)
.
Iœ.e.;, 4-1/16" - 5M FMC _
Wellhead: 11" x 4.5" 5M Gen _ M PS-01 L2 Proposed
wI 4.5" TCII T&B Tubing Hanger
4" CIW "H" SPV profile
20" x 34" insulated, 215 #/ft A-53
oJ
103/4" 45,5 ppl L·80 BTRC
(Drift ID = 9,794, cap. = .0961 bpI)
...
I 3140' I
103/4" Super Seal II Float Shoe
7 5/8" 29.7 ppl, L-80, BTRC-mod production casing
( drift ID = 6,750", cap. = 0.0459 bpI)
4,5",12.6#, L-80 IBTtbg.
( cap. = .0152 bpI, id =3.958 )
3.5", 9.2# L·80 NSCT tbg,
( cap. = .0087 bpI, id 2.992 )
Baker Hook Wall
Hanger outside 7·5/8" Window 7499'
Window in 7-5/8" Casing @ -7,487' - 7,499'
Well Angle @ window = 59°
Baker SC1-R Packer at +1-7,505' MD
3·1/2" Tailpipe
3-1/2" XN Nipple at +1- 7525'
WLEG at +1- 7535'
Window in 7-5/8" Casing @ 7685' - 7697' I
Well Angle @ window = 73°
Baker Tie Back Sleeve 7885'
Baker ZXP Liner Top Packer 7,892'
Baker 7-518" x 5' HMC Liner Hanger 7,89~
7 5/8" Halliburton Float Collar 8054'
75/8" Halliburton Float Shoe 8139'
DATE
REV. BY
COMMENTS
1 0106/03
WDa
L2 Proposed
I
NE Lateral
~"Ifr"...
I~·
r
OrigAelev. = 72,50' (Doyon 14)
Orig_ elev.= 38.30' (Doyon 14)
L
Cameo 4.5" x 1" wI BK-5latch
side pocket KG B-2 GLM
..
KOP @ 400'
53+ degree from 1950'
Max hole angle = 68 degree @ 5060'
58 degree @ Sleeve
4.5" x 3.5" X-Over @ 7270'
No-Go ID of XN nipple 2.750" @ 7331'
Phoenix Discharge gauge (3.850 ID)
4.5" HES XD Dura sliding sleeve
NOTE: ID change min. 2.840"
Phoenix gauge (2.840"ID) (4060' TVD)
4.5· x 3.5" X-Over
3.5 HES X-Nipple (2.813ID)
7-518" x 3.5" Baker Premier Packer
3.5" HES XN-Nipple
(2.813 packing bore 2.750" No Go ID)
BakerTie Back Sleeve 7,337' WLEG
~
r-
6118" Hole td @ 11,115'
66 its. - 4 1/2" R3 Slotted Liner "
12.6# L-80 IBT (7,487'-11 ,115')
Baker Hook Wall
Hanger outside 7-5/8" Window 7697'
61/8" Hole td @ 10,530'
OA Upper Lateral
V\'}. S\S~1
~
~
66 its. - 4 1/2" R3 Slotted Liner
12.6# L-80 IBT (7,747'-10,199')
8tm Baker 4 tl2' Guide Shoe to,243'
61/8" Hole td @ 10,515'
60 its. - 41/2", 12.6# L-80, 113 1
~ ~......~ 08 Lower Lateral
,-.. _. Slotted Liner (8,117'- 10,512')
81m Baker 4112" -V" Float Shoe 10,514'
12106' I
1 7,219'1
17,230'1
7,253' I
7,267' I
7,269'1
7,281'1
7,331'1
7,337' 1
.
.
Rat Hole
287'
f
MILNE POINT UNIT
WELL 5-01
API NO: 50-029-23141-60 L1
API NO: 50-029-23141-00
BP EXPLORATION (AK)
MPS-01 L2 T4 Total Depth: 11114.73ftMD,4217.50ftTVD
4217,50 TVD 18D3 4 1I2i1 Liler
fQ 11114.73nMD
6430.83 N, 3930.12 E \I'~ 4217,50nTVD
Ý
~ 132.44
ofo
End Dir, Start Sail @ 92.065° : 10420.86ftMD,4242.50ftTVD
-......-'1 ·!:I-1IUl I BPXA e
CfIIlLl,í"UiI !I..IIf.f!Vre1InJ MOl Po t U 't
.__... I ne om m
Scale: 1 inch = 750ft
3750
I
.. !'
~..,.. ...
'.
.,
:;.:"
.._~"...
..-.'.__....
~,; "=;'
Begin Dir @ 6.000°/1000: 10410.75ft MD, 4242.81ft TVD
End Dir, Start Sail @ 91.474° : 9645.30ftMD,4262.50ftTVD
WeD:
Current Well Properties
MPS-OI
Horizontal Coordinates:
Ref. Gbbal Coordinates:
Ref, Structure:
Ref, Geographical Coordinates:
RKB Elevation:
6000044,65 N, 566076,93 E
72.02 N, 267,44 W
70' 24' 38,0075" N, 149" 27' 43.0112' W
72,50ft above Mean Sea Level
Begin Dir @ 6,0000/100ft
8717,86ft MD, 4283,600 TVD
~Q
?J~
~~
~cff>
~Q'
fo~
,,9'
~,
,'ò
~.
<:>(5
~\"
<:>(5
<ò'
@o
<:l
North Reference: True North
Units: Feet (US Survey)
The "Directional Difficulty Index" for this profile is 6.4
End Dir, Start Sail @ 90.930° : 8178.00ftMD,4292.45ftTVD
Begin Dir @ 1 0.000°/1 OOft : 7983.55ft MD, 4291.76ft TVD
End Dir, Start Sail @ 89,002°: 7731.02ftMD,4287.36ftTVD
Kop TF HS Begin Dir @ 12,0000/100ft: 7487,00ft MD, 4150.81ft TVD
~Q
,~
Ç)'?>
~,~
~' ~{:>
~~ ~-
<:>(5 fo~
.~ . ~ .,
."~ ~'ò
¡§:-' ....~Q'
~\,(5 <:><'f)"
<:>(5 <>.>,.
,<¡,. . ,,'"
@o or'? '
<j'*" f>j9
~<::- @o'ó
<Q'ð .~
,ob C:J'ð'
~= h~' ~~
ãig "'-' q-v
~~ ~O~. <j'*"'
£; 13 4200 7 "'_<::-ò
a.c: v
CD;::
C;,; .........
(ij~
.200
t:
CD
>
~Q ~Q
,\ro~ ~~
~Oj,. ~r{jJ<¡"
~' ~Q'
~ ~ <:><:>1/$
n.~"5 ,,'ò'
9:>J .ö.'
,,OJ V
~. ~~.
<:>(5 o~
~\" @oOJ
<:>(5 ~
,<:>' ~Vj
A'*" @o rt¡.'ð'
v '¡."
~<::- ?:?" MPS-01 L2 T1 ~<::-
f!Q'ð «,,<:' 4292.50 TVD jQ'ð
/8100~ / ~~;~O N, 483761 E870Q~ /
9QOO.~
I
5200
Scale: 1 inch = 400ft
I
5600
I
6400
Vertical Section (Well)
I
6000
MOPS-OJ
OrillQuest 3,03.02.002
-Milne pOint DrillQ. ues{
MPS-01L2 Wp 3
Eastings(Well)
4500 5250
I I
6000
I
- 6375
- 5625
ãi
:s:
- 4875 ~
I::
:c
t:
o
Z
- 4125
Ë
'"
...
II
.<:
- 3375 ,~
;,;
Cã
'-'
00
~Q
~{:> ~ ~{:;
~ - 'ò" .¡;.-
Ç)'<::- ~<¡,. ~(5
ra? ~'V ~.
~ Æ)' ~
~' "". ~'
~ ,,~~ -#
<>.>(5 _1>.,<:>' c,?>'ò
rJ'~' ,\J' ~'V
.OJ ~. ,"
~þ. . .~ _ç.,<0 -
,'f 0\' 'J'"
@oOj é5 OJ<¡''
.~ @o roo .~ @o
r:- C:J'ð' .,*" C:J'If Total Depth /
rt¡.'ð' .~ <J rt¡.<t 11114.73ftMD
<j'*"' <Q0\$ -,*"' MP3-01 L2TI217.50ftTVD
Ò ~<J 4242.50 TVD 4 112n Liler
<v.<:' f~~:,;O~[{vY;' 0 .5887.00 N, 43.60.32 E 11114_73nMD
~')77";1"'ï-/ 4839 QC F 11000.0""" 4217.50nTVD
_ ~,.,010400. ,3.ft MPS·01 L2T4
9"'0.~ _ ·°It r.w5-01 L2Wp 3. 4217,50 TVO
6430.83 N, 3930 12 E
.
I
6800
I \1PS-U!L1 I
7200 7600
Section Azimuth: 31,431° (True North)
.......... ..!I-......-, I BPXA ·
ºfIIIll.....nr,n'!II."'II.~.S M'I P" t U "t
...___.... I ne om m
-Milne pOintl DrillQ..uesf
MPS-01L2 Wp 3
'~.' - "t-
0:..; .f.~:
....,~}
. .. -:~;~"
. .:.
.,..
.,
.--~ ....;¡.
- ~..
,,.
." . -~..- ~æ_~":;":~~· jj¡,
~:- :~~~. ~':"-- -~.:'.:: ~..._~~
.:~.. .,~::? h~;
Well:
Current Well Properties
MPS-01
Horizontal Coordinates:
Ref. Global Coordinates :
Ref. Structure :
Ref. Geographical Coordinates :
RKB Elevation:
6000044.65 N, 566076.93 E
72.02 N, 267.44 W
70024' 38.0075" N, 149027' 43.0112" W
72.5011 above Mean Sea Level
North Reference: True North
Units: Feet (US Survey)
The "Directional Difficulty Index" for this profile is 6.4
MPS-01 L2 Wp 3,0 Proposal Data
Vertical Origin:
Horizontal Origin :
Measurement Units :
North Reference:
Well
Well
ft
True North
Dogleg severity: Degrees per 100 feet (US Survey)
Vertical Section Azimuth: 31.4310
Vertical Section Description: Well
Vertical Section Origin: 0.00 N,O.OO E
Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg
Depth Depth Section Rate
7487.00 59.719 36.462 4222.29 3323.74 N 4463.00 E 5163.37
7507.00 62.119 36.462 4232.01 3337.80 N 4473.39 E 5180.78 12.000
7731.02 89.002 36.508 4287.36 3510.63 N 4601.21 E 5394.91 12.000
7983.55 89.002 36.508 4291.76 3713.57 N 4751.42 E 5646.40 0.000
8174.25 90.560 17.500 4292.50 3882.70 N 4837.61 E 5835.66 10.000
8178.00 90.930 17.441 4292.45 3886.27 N 4838.73 E 5839.30 10.000
8717.86 90.930 17.441 4283.69 4401.25 N 5000.52 E 6363.08 0.000
9645.20 91.480 321.790 4262.50 5277.74 N 4839.95 E 7027.22 6.000
9645.30 91.474 321.790 4262.50 5277.82 N 4839.89 E 7027.26 6.000
10410.75 91.474 321.790 4242.81 5879.07 N 4366.59 E 7293.48 0.000
10420.86 92.065 321.654 4242.50 5887.00 N 4360.32 E 7296.98 6.000
11114.73 92.065 321.654 4217.50 6430.83 N 3930.12 E 7536.67 0.000
MPS-01 Target Data
Measurement Units: ft
Target Coordinate Vertical Depth Northings Eastings Vertical Depth Northings Eastings Target
Name Point Type Well Well Well Mean Sea Level ASP-4 ASP-4 Shape
(ft) (ft) (ft) (ft) (ft) (ft)
MPS-O 1 L2 T1 Entry Point 4292.50 3882.70 N 4837,61 E 4220.00 6003970.00 N 570880.00 E Point
MPS-O 1 L2 T2 Entry Point 4262.50 5277.74 N 4839.95 E 4190.00 6005365.00 N 570870,00 E Point
MPS-Ol L2 T3 Entry Point 4242.50 5887.00 N 4360.32 E 4170.00 6005970.00 N 570385.00 E Point
MPS-Ol L2 T4 Entry Point 4217.50 6430.83 N 3930.12 E 4145.00 6006510.00 N 569950.00 E Point
DrillQuest 3,03.02.002
Sper,J-Sun Drilling Self ices
Proposal Data - MPS-01- MPS-01 L2 Wp 3.0
. . . -.---
MD Delta Inclin. i Azimuth TVD Northings Easlings Dogleg T ooIface
(fI) MD (ft) r') (0) (ft) (ft) (fI) (O/100ft) (0)
-1 7487.00 59.719 36.462 4222.29: 3323.74 N 4463.00 Ej
2 7507.00 20.00: 62.119 36.462 4232.01 3337.80 N 4473.39 E! 12.000 0.000
--
3 7731.02 224.02 89.002 36.508 4287.36 3510.63 N 4601.21 E 12.000 0.101
4 7983.55 252.53 89.002 36.508 4291.76 3713.57 N 4751.42 E 0.000 0.000
5T 8174.25 190.71 90.560 17.500 4292.50 3882.70 N 4837.61 E 10.000 274.607
6 8178.00 3.74 90.930 17.441 4292.45 3886.27 N 4838.73 E 10,000 350.953
7 8717.86 539.86 90.930 17.441 4283.69 4401.25 N 5000.52 E 0.000 0.000
8T 9645.20 927.34 91 .480 321.790 4262.50 5277,74 N 4839.95 E 6.000 271.157
- -
9 9645.30 0.11 91.474 321.790 4262.50 5277.82 N 4839.89 E 6.000 177.345
10 10410.75 765.44 91.474 321.790 4242.81 5879.07 N 4366.59 E 0.000 0.000
11T 10420.86 10.11 92.065 321.654 4242.50 5887.00 N 4360.32 E 6.000 346.983
! 12T ~ 11114.73 693.87 92.065 321.654 4217,50 6430.83 N 3930.12 E 0.000 0.000
6 October, 2003 - 14:05
- 1 -
DrillQuest
Sperry-Sun Drilling Services
.
posal Report
6 October, 2003
-
Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 ~
Kelly Bushing: 72.500 above Mean Sea Level
~"~I m".. 'Y-SUr-]
Þ'UL.LJNG .."VIC..
A HlIIIibv_ c_p.ny
-
e
Proposal Ref: pro1282
Sperry-Sun Drilling Services
Proposal Report for MPS-01 L2 Wp 3.0
BP EXPLORATION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-5ea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft
./
7487.00 59,719 36.462 4149.79 4222.29 3323.74 N 4463.00 E 6003407.75 N 570510.35 5163,37 KopTF HS Begin Dir @ 12.000°/1001
6003416_ N""*'.16.99 E 7487,00ft MD, 4150.81ft TVD
7500,00 61.279 36.462 4156.20 4228.70 3332,84 N 4469,72 E 12.000 5174.64
7507.00 62.119 36.462 4159.51 4232.01 3337.80 N 4473,39 E 6003421.90 N 570520,61 E 12.000 5180,78
7600,00 73.279 36.482 4194,75 4267.25 3406.88 N 4524,45 E 6003491.43 N 570571 .07 E 12.000 5266.36
7700,00 85.279 36,502 4213.32 4285.82 3485.73 N 4582,78 E 6003570,79 N 570628.69 E 12.000 5364,05
7731.02 89,002 36.508 4214,86 4287.36 60ðIJli.85 N 570646.90 E 12,000 5394.91 End Dir, Start Sail @ 89.002° : e
7731.02ftMD,4287.36ftTVD
7800.00 89.002 36.508 4216.07 4288.57 6003651.64 N 570687.44 E 0,000 5463.61
7900.00 89.002 36.508 4217.81 4290.31 6003732,53 N 570746.21 E 0.000 5563.20
7983,55 89.002 36,508 4219,26 4291.76 6003800.11 N 570795,31 E 0.000 5646.40 Begin Dir @ 10.0000/100ft: 7983.55t
MD, 4291.76ft TVD
8000.00 89,134 34.867 4219.53 4292.0~!I!II!& 6003813,56 N 570804.79 E 10.000 5662.81
8100.00 89.951 24,900 4220,33 4292.83 3813.52 N 4810.78 E 6003900.59 N 570853.78 E 10.000 5762,64
8174.25 90.560 17.500 4220,00 4292.50 3882.70 N 4837.61 E 6003970.00 N 570880.00 E 10.000 5835,66 Target - MPS-01 L2 T1, Current Targ€
8178,00 90.930 17.441 4219.95 4292.45 3886.27 N 4838.73 E 6003973.58 N 570881.09 E 10.000 5839.30 End Dir, Start Sail @ 90.930° :
8178.00ftMD,4292.45ftTVD
8200.00 90.930 3907.26 N 4845.33 E 6003994.63 N 570887.50 E 0.000 5860,64
8300.00 90.930 4002.65 N 4875.30 E 6004090.28 N 570916,62 E 0.000 5957.67
.11111
8400.00 90.93d .. 4288.85 4098.04 N 4905.27 E 6004185.93 N 570945,75 E 0.000 6054.69
8500,00 90.930 4287.23 4193.43 N 4935.23 E 6004281.58 N 570974,87 E 0,000 6151.71
8600.00 90.930 4285.60 4288.82 N 4965.20 E 6004377.23 N 571003.99 E 0.000 6248,73
8700,00 90.930 4283.98 4384.21 N 4995.17 E 6004472.88 N 571033.12 E 0.000 6345.75
8717.86 90.930 4283.69 4401.25 N 5000.52 E 6004489.97 N 571038.32 E 0,000 6363,08 Begin Dir @ 6.0000/100ft: 8717.86ft
MD, 4283,69ft TVD e
8800.00 91 .026 12,513 4209.79 4282.29 4480.56 N 5021.74 E 6004569.47 N 571058.83 E 6.000 6441.82
8900.00 91 .132 6,513 4207.90 4280.40 4579.12 N 5038.26 E 6004668.17 N 571074.48 E 6.000 6534,53
9000,00 91 .226 0.512 4205.84 4278.34 4678.87 N 5044.38 E 6004767.97 N 571079.72 E 6.000 6622.83
9100,00 91 ,307 354.511 4203.63 4276.13 4778.71 N 5040.04 E 6004867.76 N 571074.50 E 6.000 6705,76
9200,00 91 ,373 348.510 4201.29 4273.79 4877,54 N 5025.29 E 6004966,46 N 571058.87 E 6.000 6782.40
9300.00 91 .425 342.509 4198,85 4271.35 4974,28 N 5000,29 E 6005062.98 N 571033.01 E 6.000 6851,91
9400.00 91 ,461 336.507 4196.33 4268.83 5067,88 N 4965,31 E 6005156.26 N 570997,21 E 6.000 6913.53
9500.00 91 .480 330,505 4193.76 4266.26 5157,31 N 4920.73 E 6005245,29 N 570951.84 E 6.000 6966.59
9600.00 91 ,484 324.503 4191.17 4263.67 5241.59 N 4867.05 E 6005329.09 N 570897.42 E 6.000 7010.51
9645.20 91.480 321,790 4190.00 4262,50 5277.74 N 4839.95 E 6005365,00 N 570870.00 E 6,000 7027.22 Target - MPS-01 L2 T2, Current Targ€
6 October, 2003 -14:06
Page2of5
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for MPS-01 L2 Wp 3.0
BP EXPLORA nON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft
9645.30 91 .474 321.790 4190.00 4262,50 5277 .82 N 4839.89 E 6005365.08 N 7027.26 End Dir, Start Sail @ 91.474° :
9645.30ftM D ,4262,50ftTVD
9700.00 91.474 321.790 4188.59 4261.09 5320,78 N 4806.07 E 0.000 7046.28
9800.00 91.474 321,790 4186.02 4258.52 5399.33 N 4744.23 E 0.000 7081,06
9900.00 91.474 321 .790 4183.45 4255.95 5477.88 N 4682.40 E 0.000 7115,84
10000,00 91.474 321 .790 4180,88 4253.38 5556.43 N 4620,57 E 0.000 7150.62
10100.00 91,474 321.790 4178,30 4250.80 5634.98 N 60 .74N 570585.63 E 0.000 7185.40 e
10200,00 91.474 321.790 4175.73 4248,23 5713.53 N 6005797.74 N 570523.10 E 0.000 7220.18
10300.00 91.474 321.790 4173.16 4245.66 5792,08 N 6005875.74 N 570460.58 E 0,000 7254.96
10400.00 91.474 321.790 4170,59 4243,09 5870.63 N 6005953,74 N 570398.05 E 0,000 7289.74
10410.75 91.474 321.790 4170,31 4242.81 ,07 N 6005962.12 N 570391,33 E 0,000 7293.48 Begin Dir @ 6.0000/100ft: 10410.75t
MD, 4242.81ft TVD
10420.86 92,065 321.654 4170,00 N 4360.32 E 6005970.00 N 570385.00 E 6.000 7296.98 End Dir, Start Sail @ 92.065° :
10420 .86ftM D ,4242,50ftTVD
Target - MPS-01 L2 T3, Current TargE
10500.00 92.065 321 ,654 4167, 5949.03 N 4311.26 E 6006031.59 N 570335.38 E 0.000 7324.32
10600.00 92.065 321.654 4163,55 6027.41 N 4249.25 E 6006109.42 N 570272.69 E 0,000 7358.86
10700.00 92.065 321.654 4159,94 6105.78 N 4187.25 E 6006187.24 N 570210.00 E 0.000 7393.41
10800.00 92.065 321.654 4156.34 6184.16 N 4125,25 E 6006265.07 N 570147.31 E 0.000 7427.95
10900.00 92.065Âs2 . 52.74 4225,24 6262.54 N 4063.25 E 6006342,89 N 570084.62 E 0.000 7462.50
11000.00 92.065 321.654 49.13 4221,63 6340,91 N 4001.25 E 6006420.72 N 570021.92 E 0.000 7497.04
11100.00 92,065 321.654 4145.53 4218.03 6419.29 N 3939.25 E 6006498.54 N 569959,23 E 0.000 7531.59
11114.73 92.065 ~,654 4145.00 ~ 4217,50 6430,83 N 3930,12 E 6006510.00 N 569950.00 E 0,000 7536.67 Total Depth:
11114,73ftMD,4217.50ftTVD
4 1/2in Liner
Target - MPS-01 L2 T4, Current e
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4,
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 31.431 ° (True).
Magnetic Declination at Surface is 25.357°(05-0ct-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 11114,73ft.,
The Bottom Hole Displacement is 7536.67ft., in the Direction of 31.431 ° (True).
The Along Hole Displacement is 9207.58ft, the Planned Tortuosity is 3.312°/100ft and the Directional Difficulty Index is 6.4.
6 October, 2003 -14:06
Page30f5
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for MPS-01 L2 Wp 3.0
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
Comments
Measured
Depth
(ft)
7487.00
7731,02
7983.55
8178.00
8717.86
9645.30
10410.75
10420.86
11114.73
CasinQ details
From
Measured
Depth
(ft)
7487,00
6 October, 2003 -14:06
BPXA
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
.
Comment
4222,29 3323.74 N 4463.00 E
4287,36 3510.63 N 4601.21 E
4291,76 3713.57 N 4751,42 E
4292,45 3886.28 N
4283.69 4401.25 N
4262.50 5277.82 N
4242.81 5879.07 N
4242.50 5887.00 N
4217,50
e
0° : 8178.00ftMD,4292,45ftTVD
717.86ft MD, 4283.69ft TVD
, 74°: 9645.30ftMD,4262.50ftTVD
100ft: 10410.75ft MD, 4242.81ft TVD
íI @ 92,065° : 10420.86ftMD,4242.50ftTVD
I Depth: 11114.73ftMD,4217.50ftTVD
Casing Detail
<Run-TD> <Run-TD>
4 1/2in Liner
-
Page 4 of5
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Proposal Report for MPS-01 L2 Wp 3.0
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
TarQets associated with this welløath
Target Name
MPS-01 L2 T1
MPS-01 L2 T2
MPS-01 L2 T3
MPS-01 L2 T4
6 October, 2003 -14:06
11.
nates
Eastings Target Target
(ft) Shape Type
4837,61 E Point Current Target
570880.00 E
149025' 21.1294" W e
5277.74 N 4839.95 E Point Current Target
6005365,00 N 570870,00 E
700 25' 29.9026" N 1490 25' 21 .0342" W
4242,50 5887.00 N 4360,32 E Point Current Target
eVGlobal Coordinates: 4170.00 6005970.00 N 570385.00 E
graphical Coordinates: 70025' 35.8981" N 149025' 35.0933" W
4217.50 6430,83 N 3930,12 E Point Current Target
ean Sea Level/Global Coordinates: 4145.00 6006510,00 N 569950.00 E
Geographical Coordinates: 700 25' 41.2494" N 149025' 47.7057" W
e
Page50f5
DrillQuest 3.03.02.002
WElL DETAILS
ANTI-COLLISION SETTINGS
Natœ +N/-S +EI-W Northing
MPS-OI 69.04 ·267.49 6000044.65
-121
····-100
-75
··SO
-25
-0 270
-25
-50
-75
-100
-121
From Colour ToMD
7487 7500
7500 7750
7750 8000
8000 8250
0 8250 8500
8500 8750
8750 9000
9000 9250
9250 9500
9500 9750
9750 10000
10000 10250
10250 10500
10500 10750
10750 11 000
11000 11250
11250 11500
11500 11750
-20.0
-15,0
EastbJg latitude longitude Slot
566076.93 7O"'24·38.008N 149"2143.0IlW N/A
Interpolation MethodMD
Depth Range From: 7487.00
Maximum Range: 1308.12
Interval: 25.00
To: II 1I5,43
Reference: Plan: MPS-Ql L2 Wp 3.0
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [50ft/in]
COMPANY DETAILS
BP Amoco
Cakuh60n Method: :Minirrwm CUlVature
=~ ~~~kNoIth
W'=:=: ~~J$ing
SURVEY PROGRAM
Jepth Pm Depth To SUlVeylPlm
7487.00 11115.43 Pkumed:MPS-OlL2Wp3.0V8
rool
MWo.-IFR+MS
WELLPATH DEI AILS
Plan MPS-Ol L2
ParentWel\Mth:
Tie on MD:
MPS-OI
7487.00
From Colour
7487
7500
7750
8000
8250
8500
8750
9000
9250
9500
9750
10000 .--
10250
o 10500
750
o
-5,0
90
-Œ70 90
--5.0
'-10.0
·-15.0
-20,0 18!¥"U
Rig:
Ref. Datum:
MPS-OI: 72.500
V.Seçoon Origin Origin
Angle +NI-S +EI-W
s......
From TVD
ToMD
7500
7750
8000
8250
8500
8750
9000
9250
9500
9750
10000
10250
10500
10750
11 000
11250
11500
11750
n.:r Lot: Hili ~ :.!J
LEGEND
- MPE-29(MPE-29), MajJrRid:
- MPS-OI (MPS-Ol), NOERRORS
- MPS-OI (MPS-OIL1). NOERRORS
MPS-Ol (MPS-OIPBI), NOERRORS
MPS-07 (MPS-07). MajJr Rid.:
Plm MPS-OI L2
MPS-OI L2 Wp 3.0
e
e
Phn: MPS-Ol L2 Wp 3.0 (MPS-OIlPim MPS-OI L2)
Created By: Bart Goff Date: loro6I2OO3
::hecked:
Dote
Dote
Dote
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [15ft/ir rrovol:
Reviewed:
SECTIONDETAll..S
s~ MD In, A>; TVD +N/-S +FJ-W DLo, TFaçe VS~ TUg<!
I 7487.00 59.72 36.4ó 4222.29 3323.93 4462,97 0,00 0.00 5163.51
2 7507.00 62.12 36.4ó 4232.02 3337.99 4473.36 12.00 0.00 5180.92
3 7731.03 89,00 3655 4287.37 3510.77 4601.26 12.00 0.11) 5395.04
4 7983.55 89.00 36.55 4291.76 3713.59 4751.62 0,00 0.00 5646.51
5 8174.69 90.56 17.50 4292.50 3883.07 4838.07 10.00 -85.42 5836.21 MPSOILl Tl Rev 1
6 8178,48 90.93 17.44- 4292.45 3886." 4839.21 10.00 -9.43 5839.89
7 8718.47 90.93 17,44 4283.68 4401.80 5001.01 0,00 0.00 6363.78
8 9645.76 91.48 321.79 4262.50 5278.24 4840.41 6.00 -88.85 7027.88 MPSOILl T2 Rev 1
9 9645.83 91.47 321.79 4262.50 5278.29 4840.37 6,00 166.98 7027.91
10 10411.39 91.47 321.79 4242.81 5879.63 4367.00 0,00 0.00 7294.16
II 10421.50 92.06 321.65 4242.50 5887.56 4360.74 6.00 -13.02 7297.67 MPSOILl T3 Rev 1
12 11115.43 92.06 321.65 4217.50 6431.44 3930.49 0.00 0.00 7537.39 MPSOILl T4
e
Sperry-Sun
Anticollision Report
e
Company:
Field:
Reference Site:
Reference Well:
Reference Wellpath:
BPAmoco
Milne Point
MPtSPad
MPS-01
Plan MPS-01 L2
Date: 10/06/2003 Time: 14:53:24
Page: .. 1
Co-ordinate(NE) Reference: Well: MPS-01, True North
Vertical (TVD) Reference: MPS-01: 72.5
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method: MD Interval: 25.00 ft
Depth Range: 7487,00 to 11115.43 ft
Maximum Radius: 1308.12 ft
Reference:
Error Model:
Scan Method:
Error Surface:
Db: Oracle
Principal Plan & PLANNED PROGRAM
ISCW SA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 10/06/2003 Validated: No
Planned From To Survey
ft ft
120.00 245.00
367.16 6757.35
6800.00 7487.00
7487,00 11115.43
Version: 0
Toolcode
Tool Name
MPS-01 Gyro (120.00-245.00) (0)
MPS-01 PB1 IIFR (367,16-11267.27) (0)
MPS-01 IIFR (6800.00-10446,00) (1)
Planned: MPS-01 L2 Wp 3.0 V8
KPR-SS
MWD+IFR+MS
MWD+IFR+MS
MWD+IFR+MS
SDC Keeper single shots
MWD + IFR + Multi Station
MWD + IFR + Multi Station
MWD + IFR + Multi Station
Casing Points
MD TVD Diameter Hole Size Name
ft ft in in
11166.02 0.00 4.500 6.000 41/2"
Summary
<--------------------- Offset Wellpath ------------------> Reference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Warning
ft ft ft ft ft
MPtEPad MPE-29 MPE-29 V1 Out of range
M PtS Pad MPS-01 MPS-01 V4 7500.00 7500.00 0.15 0.00 0,15 Pass: NOERRORS
M PtS Pad MPS-01 MPS-û1L1 V3 7500.00 7500.00 0.15 0.00 0.15 Pass: NO ERRORS
M PtS Pad MPS-01 MPS-01 PB1 V7 7490.03 7525,00 159.15 0.00 159.15 Pass: NOERRORS
M PtS Pad MPS-07 MPS-07 V9 9918.67 8694.80 1006.22 89.38 916.84 Pass: Major Risk
Site: M PtS Pad
Well: MPS-01 Rule Assigned: NOERRORS
Wellpath: MPS-01 V4 Inter-Site Error: 0,00 ft
.-., '-----_._'--_.__._.~-_..._._---'_.-
Reference Offset Semi-Ml\ior Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H!Ðistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
7500,00 4228.70 7500,00 4228.82 25.25 25.13 223.67 187.21 7.625 0.15 0.00 0.15 Pass
7524.94 4240.10 7525.00 4241.20 25.25 25.13 223.91 187.44 7.625 1.23 0.00 1.23 Pass
7549.78 4250.30 7550.00 4252.90 25.25 25,13 224.88 188.40 7.625 2.85 0.00 2.85 Pass
7574.51 4259.27 7575.00 4263.79 25,26 25.15 225.75 189,25 7,625 4,87 0,00 4.87 Pass
7599.08 4266.98 7600.00 4273.85 25.27 25.16 226.46 189.96 7.625 7.28 0.00 7.28 Pass
7623.48 4273.45 7625.00 4283.11 25.29 25.19 227.29 190.78 7,625 10,12 0,00 10.12 Pass
7647,66 4278.66 7650.00 4291.68 25.32 25.22 228.82 192.30 7.625 13.57 0.00 13.57 Pass
7671.56 4282.63 7675.00 4299,58 25.36 25.26 230,56 194.03 7.625 17.64 0.00 17.64 Pass
7695,16 4285.39 7700.00 4306.80 25.40 25.31 232.26 195.72 7.625 22.33 0.00 22.33 Pass
7718.40 4286.98 7725.00 4313.43 25.45 25.37 233,65 197.11 7.625 27.70 0.00 27,70 Pass
7741.91 4287.55 7750.00 4319.65 25.51 25.44 234.60 198.05 7.625 33.76 0.00 33.76 Pass
7766,19 4287.98 7775.00 4325.47 25.58 25.51 235.65 199.10 7.625 39.68 0.00 39.68 Pass
7790.53 4288.40 7800.00 4330.89 25.64 25.58 236,86 200.30 7.625 45.31 0.00 45.31 Pass
7814,92 4288.82 7825.00 4335.95 25.71 25.65 238.09 201.54 7.625 50,67 0.00 50.67 Pass
7839.36 4289.25 7850.00 4340.73 25.78 25,73 239.29 202.73 7.625 55.83 0.00 55.83 Pass
7863.84 4289.68 7875.00 4345.23 25.85 25,80 240.46 203.91 7.625 60.78 0.00 60.78 Pass
7888.35 4290.10 7900.00 4349.45 25.92 25.88 241.63 205.08 7.625 65.53 0.00 65.53 Pass
7912,87 4290.53 7925.00 4353.37 25.99 25.95 242.91 206,36 7.625 70,14 0.00 70.14 Pass
7937.40 4290.96 7950.00 4356.99 26.06 26.03 244.32 207.77 7.625 74.64 0.00 74.64 Pass
7961.92 4291.38 7975.00 4360.31 26.13 26.11 245,85 209.29 7.625 79.04 0.00 79.04 Pass
7986.62 4291.81 8000.00 4363.34 26.16 26.15 247.20 210.96 7.625 83.42 0,00 83.42 Pass
8012.93 4292.21 8025.00 4366,16 25.82 25.85 246.18 212.56 7.625 87.75 0.00 87.75 Pass
8039.50 4292.51 8050.00 4368.79 25.45 25,50 244.84 213.87 7.625 91.88 0.00 91.87 Pass
8066.32 4292.72 8075.00 4371.23 25,02 25.10 243.23 214.92 7.625 95.76 0.00 95.75 Pass
8093.38 4292.82 8100.00 4373.47 24.54 24,63 241.27 215.67 7.625 99.28 0.00 99.28 Pass
e Sperry-SUD .-
Anticollision Report
Company: BP Amoco Date: 1010612003 Time: 14:53:24 Page: 2
Held: Milne Point
Reference Site: M PtS Pad Co-ordinate(NE) Reference: Well: MPS-01, True North
Reference Well: MPS-01 Vertical (TVD) Reference: MPS-01: 72.5
Reference Wellpath: Plan MPS-Q1 L2 Db: Oracle
Site: M PtS Pad
Well: MPS-01 Rule Assigned: NOERRORS
Wellpath: MPS-01 V4 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis . Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AzI TI<'O-HS CasingIHIDistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
8120.70 4292.82 8125.00 4375,59 23,99 24.10 238.71 215.83 7,625 102.09 0.00 102.09 Pass
8148.15 4292.71 8150.00 4377.58 23.41 23.52 235.57 215.42 7.625 104.15 0.00 104.15 Pass
8175.41 4292.49 8175.00 4379,44 22.79 22.91 231,96 214.48 7.625 105.48 0.00 105.48 Pass
8199.88 4292,10 8200.00 4381.18 22,85 22.98 230.71 213.27 7.625 106.56 0.00 106.56 Pass
8224.78 4291.70 8225.00 4382.79 22.93 23.05 229,65 212,21 7.625 107.68 0.00 107.67 Pass
8249.69 4291.29 8250.00 4384.27 23.01 23.14 228.75 211,31 7,625 108,85 0.00 108.84 Pass
8274.63 4290.89 8275,00 4385.54 23.09 23.23 228,13 210.69 7.625 110.09 0.00 110.08 Pass
8299.59 4290,48 8300.00 4386.61 23.17 23.32 227.76 210.32 7.625 111.37 0.00 111.37 Pass
8324.55 4290.08 8325.00 4387.57 23.25 23.42 227.49 210.05 7.625 112,65 0,00 112.65 Pass
8349.51 4289.67 8350.00 4388.47 23.33 23,51 227.30 209.86 7.625 113.94 0.00 113.94 Pass
8374.47 4289.27 8375.00 4389.33 23.41 23.60 227.29 209.85 7.625 115.38 0.00 115.38 Pass
8399.42 4288,86 8400.00 4390.13 23.49 23.68 227.41 209.97 7.625 116.91 0.00 116.91 Pass
8424,38 4288.46 8425.00 4390.83 23.58 23.76 227.54 210.10 7.625 118.35 0.00 118.35 Pass
8449,35 4288.05 8450.00 4391.31 23.66 23.84 227.71 210.28 7.625 119.58 0.00 119.58 Pass
8474,32 4287.64 8475.00 4391.21 23.75 23.91 228.06 210.62 7.625 120.36 0.00 120.36 Pass
8499.30 4287.24 8500.00 4390.77 23.83 23.98 228.49 211.06 7.625 120.87 0.00 120.87 Pass
8524,28 4286.83 8525.00 4390.37 23.92 24.05 228.91 211.47 7.625 121.41 0.00 121.41 Pass
8549.26 4286.43 8550.00 4389.91 24,00 24.11 229.31 211.87 7,625 121.87 0.00 121.87 Pass
8574.25 4286.02 8575.00 4389,24 24.09 24.17 229.71 212,27 7,625 122.08 0.00 122.08 Pass
8599.24 4285.61 8600.00 4388.63 24.18 24.23 230,03 212.60 7.625 122.28 0.00 122.28 Pass
8624.20 4285.21 8624.97 4388.35 24,27 24.29 230.22 212.78 7,625 122.69 0.00 122.69 Pass
8649.22 4284.80 8650.00 4388,20 24.35 24.36 230.37 212.93 7.625 123.20 0.00 123.20 Pass
8674.21 4284.40 8675,00 4387.95 24.44 24.45 230.59 213.15 7.625 123.70 0.00 123.70 Pass
8699.20 4283.99 8700.00 4387.54 24.53 24.54 230.90 213.46 7.625 124,14 0.00 124.13 Pass
8724.61 4283.58 8725.00 4386.95 24.52 24.54 230.92 213.85 7.625 124.49 0.00 124.49 Pass
8751.51 4283,13 8750.00 4386.58 24.17 24.18 229.48 214.02 7.625 124.83 0.00 124.83 Pass
8778.42 4282.67 8775.00 4386.61 23.78 23,81 227.69 213.85 7.625 125.17 0.00 125.17 Pass
8805.30 4282,19 8800.00 4386,64 23,38 23.41 225.67 213.44 7.625 125.19 0.00 125.19 Pass
8832.13 4281,70 8825.00 4386.61 22.96 23.01 223.43 212.81 7.625 124.84 0.00 124.84 Pass
8858,86 4281.20 8850.00 4386.61 22.54 22.59 220.93 211.92 7,625 124.21 0.00 124.21 Pass
8885.45 4280.69 8875.00 4386.69 22.10 22.15 218,10 210.68 7.625 123.28 0.00 123.28 Pass
8911.72 4280.17 8900.00 4387.00 21.65 21.68 214.63 208.79 7.625 121.92 0.00 121.92 Pass
8937.57 4279.65 8925.00 4387,54 21.20 21.21 210,55 206.26 7.625 120.33 0.00 120.33 Pass
8963.11 4279.12 8950.00 4388.33 20.74 20.73 206.13 203.37 7.625 118.99 0,00 118.99 Pass
8988.30 4278.59 8975,00 4389.42 20.28 20,25 201.37 200.12 7.625 118.06 0.00 118.06 Pass
9013,08 4278.06 9000,00 4390.93 19.82 19,76 196.22 196.46 7.625 117.72 0.00 117.72 Pass
9037.40 4277.53 9025.00 4392.78 19.36 19.28 190.74 192.43 7.625 118.04 0.00 118.04 Pass
9061.24 4277.00 9050.00 4394.79 18.89 18.79 184.99 188,11 7.625 119.01 0.00 119.01 Pass
9084,61 4276.48 9075,00 4396.86 18.43 18.32 179.05 183.59 7.625 120.64 0.00 120.64 Pass
9107.52 4275,96 9100.00 4398.85 17.98 17.85 173,03 178.94 4.500 122.94 0.00 122.94 Pass
9129.91 4275,44 9125.00 4400.57 17.53 17.39 166,92 174.17 4.500 125.81 0.00 125.81 Pass
9151,76 4274.93 9150.00 4401.89 17,09 16.93 160.74 169.30 4.500 129.24 0,00 129.24 Pass
9173.12 4274,43 9175.00 4403.20 16.65 16.48 154,67 164.52 4.500 133.66 0.00 133.66 Pass
9194.08 4273.93 9200.00 4404.78 16,22 16.03 148.90 160.01 4.500 139.28 0.00 139.28 Pass
9214.61 4273.44 9225.00 4406.64 15.80 15.59 143 .48 155.81 4.500 146.06 0.00 146.06 Pass
9234.72 4272.95 9250,00 4408.79 15.39 15.16 138.43 151.97 4.500 153.93 0.00 153.93 Pass
9254.40 4272.47 9275.00 4410.94 14.99 14.75 133,69 148.41 4.500 162.61 0.00 162.61 Pass
9273.65 4272.00 9300,00 4412.98 14.60 14,36 129.22 145.10 4.500 171.95 0.00 171.95 Pass
9292.45 4271.54 9325.00 4414.93 14.22 13.99 125.02 142.03 4.500 181.96 0.00 181.96 Pass
9310.79 4271.08 9350.00 4416.79 13.85 13.63 121.07 139.17 4.500 192.62 0.00 192.62 Pass
e e
Sperry-Sun
Anticollision Report
.. .----,.,.---....."""
Com¡r.III~·: BP Amoco nate: 10106/2003 Tillie: 14:53:24 Pn~e: .,
Field: Milne Point
Kererence Site: M Pt S Pad Co-ordinuteClil':) Ref'erellœ: Well: MPS-01, True North
Kel'erence Well: MPS-01 Verticul (T\'U) Kcfel'enl~e: MPS-01: 72.5
Kererenœ Wellpath: Plan MPS-O 1 L2 nb: Oracle
..----.-... ----...------
Site: M PtS Pad
Well: MPS-01 Rule Assigned: NOERRORS
Wellpath: MPS-01 V4 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr· No-Go AJlowdble·
MD TVD MD TVD Ref Offset .....'O+AZI TFO-IIS CasingIII!Ðistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
9328.50 4270.64 9375.00 4418.54 13,50 13.27 117.30 136.47 4.500 204.07 0.00 204.07 Pass
9345.58 4270.21 9400.00 4420.17 13.17 12.93 113,72 133.92 4.500 216.28 0.00 216,28 Pass
9362.18 4269.79 9425.00 4421.58 12.86 12.60 110.34 131.53 4.500 229.02 0.00 229.01 Pass
9378.34 4269.38 9450.00 4422.79 12.56 12.28 107,15 129.31 4.500 242.24 0.00 242.24 Pass
9394.03 4268.98 9475.00 4424.05 12.27 11.99 104.18 127.28 4.500 256.08 0.00 256.07 Pass
9409.22 4268.60 9500.00 4425.29 12.00 11.70 101.40 125.41 4.500 270.49 0.00 270.49 Pass
9423.77 4268.22 9525.00 4426.19 11.76 11.44 98.72 123.61 4.500 285.47 0.00 285.47 Pass
9437.75 4267,87 9550.00 4426.82 11.52 11.20 96,17 121 ,89 4.500 300,97 0.00 300.97 Pass
9450.00 4267.55 9575.00 4427.48 11.32 11.01 93.87 120.33 4.500 316.89 0.00 316.89 Pass
9464.58 4267,18 9600.00 4428.09 11.11 10.78 91,55 118,89 4.500 333,21 0.00 333.21 Pass
9477.30 4266.85 9625,00 4428.54 10.92 10,60 89.43 117 .53 4.500 349.98 0.00 349.98 Pass
9489.60 4266.53 9650.00 4428.83 10.75 10.44 87.41 116.25 4.500 367.09 0.00 367.09 Pass
9500.00 4266.27 9675.00 4428,97 10.60 10.33 85.59 115.06 4,500 384.47 0,00 384.46 Pass
9513.26 4265.92 9700,00 4429.21 10.45 10,17 83.71 113.96 4.500 402.17 0.00 402.17 Pass
9524,58 4265.63 9725,00 4429.73 10.32 10,06 82.05 112.99 4.500 420.30 0.00 420.30 Pass
9535.59 4265.35 9750.00 4430,39 10.20 9.95 80.51 112.11 4.500 438.73 0.00 438,73 Pass
9550.00 4264.97 9775.00 4431.05 10.04 9,81 78.82 111.28 4.500 457.41 0.00 457.41 Pass
9550.00 4264.97 9800.00 4431.58 10,04 9.85 78.06 110.52 4.500 476.33 0.00 476.33 Pass
9566.81 4264,54 9825.00 4431,91 9.90 9.71 76,28 109.76 4.500 495,35 0.00 495.35 Pass
9576.69 4264,28 9850.00 4432.27 9.83 9.65 75,00 109.06 4.500 514.58 0.00 514.58 Pass
9586.42 4264.03 9875.00 4432.74 9.75 9.60 73.78 108.43 4.500 533,93 0.00 533.93 Pass
9600.00 4263,68 9900.00 4433.29 9.64 9.52 72,38 107.84 4.500 553.37 0.00 553.36 Pass
9600.00 4263.68 9925.00 4433.89 9.64 9.55 71.85 107.32 4.500 572.88 0.00 572.88 Pass
9614.53 4263.31 9950.00 4434.20 9.57 9.48 70.43 106.77 4.500 592.62 0.00 592.62 Pass
9623.12 4263.08 9975,00 4434.19 9.53 9.45 69.37 106.22 4.500 612.71 0.00 612.71 Pass
9631.44 4262.87 10000.00 4433,98 9.48 9.43 68.34 105.69 4.500 632.97 0.00 632.97 Pass
9645.76 4262.50 10025.00 4433.72 9.41 9,38 66.96 105.17 4.500 653.42 0.00 653.42 Pass
9648.56 4262.43 10050.00 4433.84 9.42 9.40 66.53 104,74 4.500 674,00 0.00 674.00 Pass
9661.70 4262.09 10075.00 4434.42 9.45 9.42 66.16 104.37 4.500 694.80 0.00 694.79 Pass
9674.65 4261.76 10100.00 4435.57 9.49 9.44 65.85 104.06 4.500 715.84 0.00 715.84 Pass
9687.50 4261.43 10125.00 4437.14 9.52 9.46 65.59 103.80 4.500 737.03 0.00 737.03 Pass
9700.52 4261.09 10150.00 4438.77 9.55 9.49 65,35 103,56 4.500 758.15 0.00 758,15 Pass
9713.60 4260,75 10175.00 4440.45 9.58 9.51 65.13 103.34 4.500 779.25 0.00 779.24 Pass
9726.62 4260.42 10200.00 4442.15 9.62 9.53 64.92 103.13 4.500 800.40 0,00 800.40 Pass
9739.58 4260.09 10225.00 4444.03 9,65 9.55 64.73 102.94 4,500 821.61 0.00 821,61 Pass
9752.54 4259.75 10250,00 4446.22 9.69 9.57 64.58 102.79 4.500 842.87 0.00 842.87 Pass
9765.56 4259.42 10275.00 4448,34 9.72 9.60 64.42 102.63 4.500 864.09 0.00 864.09 Pass
9778,72 4259.08 10300.00 4449.92 9,76 9.63 64.25 1 02.46 4.500 885.17 0.00 885.17 Pass
9791.78 4258.74 10325,00 4451.29 9.79 9,65 64.06 102.27 4.500 906.29 0.00 906.29 Pass
9804.55 4258.42 10350.00 4452.70 9,83 9.68 63.88 102,09 4.500 927.60 0.00 927.60 Pass
9817.21 4258.09 10375.00 4454.03 9.88 9.71 63.71 101,92 4.500 948.96 0,00 948.96 Pass
9829.92 4257,76 10400.00 4455.19 9.92 9.73 63.53 101.74 4.500 970.29 0.00 970.29 Pass
9842.58 4257.44 10425.00 4456.44 9.96 9.76 63.37 101,58 4.500 991.66 0.00 991.66 Pass
9855.17 4257.11 10450.00 4457.87 10.01 9.78 63.22 101.43 4,500 1013.11 0.00 1013.11 Pass
9867.72 4256,79 10475.00 4459.38 10.05 9,80 63.09 101.30 4.500 1034.59 0.00 1034.59 Pass
9880.28 4256.47 10500,00 4460.89 10.09 9.81 62.96 101.16 4.500 1056.07 0.00 1056.07 Pass
9887,82 4256.27 10515.00 4461,80 10.12 9.82 62.88 101.09 4.500 1068.96 0.00 1068.96 Pass
e e
Sperry-Sun
Anticollision Report
Company: BP Amoco Date: 1010612003 Time: 14:53:24 Page: 4
Held: Milne Point
Reference Site: M Pt S Pad Co-ordinate(NE) Reference: Well: MPS-01, True North
Reference Well: MPS-01 . Vertical (TVD) Reference: MPS-01: 72.5
Reference Wellpath: Plan MPS-01 L2 Db: . Oracle
Site: M PtS Pad
Well: MPS-01 Rule Assigned: NOERRORS
Wellpath: MPS-01 L1 V3 Inter-Site Error: 0.00 ft
. Reference Offset Semi-M:üor Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref· Offset TFO+AZI TFO-IIS CasinglII1Ðistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
7500,00 4228.70 7500.00 4228.82 25.25 25.13 223.67 187.21 4,500 0.15 0.00 0.15 Pass
7524.94 4240.10 7525.00 4241.20 25.25 25.13 223,91 187.44 4.500 1.23 0.00 1.23 Pass
7549.78 4250.30 7550.00 4252,90 25.25 25.13 224.88 188.40 4.500 2.85 0.00 2.85 Pass
7574.51 4259.27 7575.00 4263.79 25.26 25.15 225,75 189.25 4.500 4.87 0.00 4,87 Pass
7599.08 4266.98 7600.00 4273.85 25,27 25.16 226.46 189.96 4.500 7.28 0.00 7.28 Pass
7623.48 4273.45 7625.00 4283.11 25,29 25.18 227.29 190.78 4.500 10.12 0.00 10.12 Pass
7647.66 4278,66 7650.00 4291.68 25.32 25.21 228.82 192.30 4.500 13.57 0.00 13.57 Pass
7671.56 4282.63 7675,00 4299.58 25.36 25.25 230.55 194.02 4.500 17.64 0.00 17.64 Pass
7695.17 4285,40 7700.00 4306.75 25.40 25,29 232.16 195.63 4.500 22.26 0,00 22.26 Pass
7718.52 4286.98 7725.00 4312.94 25.45 25.34 233.38 196,83 4.500 27,15 0.00 27.15 Pass
7742.30 4287,56 7750.00 4318.14 25.51 25.40 234.38 197.83 4.500 32.13 0.00 32.13 Pass
7766,91 4287.99 7775.00 4322.42 25.58 25.46 235.65 199.10 4,500 36.44 0.00 36.44 Pass
7791.61 4288.42 7800.00 4326.07 25.64 25.53 237.09 200.54 4.500 40.21 0.00 40.21 Pass
7816.38 4288.85 7825.00 4329.00 25,71 25.59 238.75 202.20 4.500 43.38 0.00 43.38 Pass
7841.21 4289.28 7850.00 4331.01 25.78 25.66 240.77 204.22 4.500 45.77 0.00 45.77 Pass
7866.08 4289.71 7875.00 4332,14 25.85 25.72 243,16 206.61 4.500 47.45 0.00 47.45 Pass
7890.94 4290.15 7900,00 4332.48 25.92 25.79 245.92 209.37 4.500 48.58 0.00 48.58 Pass
7915.80 4290.58 7925.00 4332.33 26.00 25.86 248.94 212.39 4.500 49.45 0.00 49.45 Pass
7940.63 4291.01 7950.00 4332.01 26.07 25.93 252.04 215.49 4.500 50,36 0,00 50.36 Pass
7965.41 4291.44 7975.00 4331.59 26.14 26.00 255.48 218.93 4.500 51.61 0.00 51.61 Pass
7990.46 4291.88 8000.00 4331.20 26.11 25.97 258.72 222.86 4.500 53.66 0,00 53.66 Pass
8016.78 4292,26 8025.00 4330.97 25.77 25,64 259.41 226.17 4.500 55.90 0.00 55.90 Pass
8043.39 4292.55 8050.00 4330.98 25.40 25.26 259.02 228.44 4.500 57.93 0.00 57.93 Pass
8070.21 4292.74 8075.00 4331.10 24.95 24.82 257.89 229.98 4.500 59.66 0.00 59.65 Pass
8097.19 4292.83 8100.00 4331.26 24.47 24.33 256.22 231.00 4.500 61.06 0.00 61.06 Pass
8124.28 4292.81 8125.00 4331,46 23.91 23.79 253,95 231 .43 4.500 62.00 0.00 61.99 Pass
8151.42 4292.69 8150.00 4331.74 23.34 23.20 251.06 231.24 4.500 62.38 0.00 62.38 Pass
8178.04 4292.46 8175,00 4332.09 22.79 22.65 247.75 230,30 4.500 62,05 0,00 62.05 Pass
8202.97 4292.05 8200.00 4332.51 22.86 22.71 246.35 228.92 4.500 61.57 0.00 61.57 Pass
8227.93 4291.65 8225,00 4333.07 22.94 22.77 245.09 227.65 4,500 61.50 0.00 61,50 Pass
8252.90 4291 ,24 8250.00 4333.76 23.02 22,84 244.03 226.59 4.500 61.88 0.00 61.88 Pass
8277 .88 4290.84 8275.00 4334.48 23,10 22.91 243.13 225.69 4,500 62.49 0.00 62.49 Pass
8302.85 4290.43 8300.00 4335,21 23.18 22.98 242.36 224.93 4.500 63.26 0.00 63.26 Pass
8327.81 4290.02 8325.00 4336.12 23,26 23.06 241.66 224.22 4.500 64,33 0,00 64.33 Pass
8352.77 4289.62 8350.00 4337.24 23.34 23.12 240.98 223.54 4.500 65.71 0,00 65.71 Pass
8377.71 4289.21 8375,00 4338.51 23.42 23.19 240.21 222.78 4.500 67,17 0,00 67.17 Pass
8402,64 4288.81 8400.00 4339.88 23.50 23.25 239.38 221.94 4.500 68.67 0.00 68,67 Pass
8427.58 4288.40 8425,00 4341.14 23.59 23.32 238.65 221 ,21 4.500 70.10 0.00 70.10 Pass
8452.54 4288.00 8450.00 4342.12 23.67 23,39 238.08 220.64 4.500 71.33 0.00 71.33 Pass
8477.53 4287.59 8475,00 4342.42 23.76 23.46 237.83 220.39 4.500 71.99 0.00 71.99 Pass
8502.53 4287.19 8500.00 4342.18 23,84 23.53 237.82 220.38 4.500 72.20 0.00 72.20 Pass
8527.53 4286.78 8525.00 4341.74 23.93 23.61 237.89 220.45 4.500 72.24 0.00 72,24 Pass
8552.53 4286.37 8550.00 4341.27 24,01 23.67 237.95 220.51 4.500 72.21 0.00 72.21 Pass
8577 .53 4285.97 8575.00 4341.04 24,10 23.74 237.79 220.36 4.500 72,28 0,00 72.28 Pass
8602.53 4285.56 8600.00 4340,90 24,19 23.81 237,55 220.11 4.500 72.36 0.00 72.36 Pass
8627.53 4285.16 8625.00 4340.62 24.28 23,87 237.34 219.91 4,500 72.31 0.00 72,31 Pass
8652.52 4284.75 8650.00 4340.39 24.37 23.94 237.07 219.63 4.500 72.25 0.00 72.25 Pass
8677.52 4284.34 8675.00 4340.42 24.46 24.01 236.58 219.14 4,500 72.31 0.00 72.31 Pass
8702.51 4283.94 8700,00 4340.50 24.54 24.08 236.08 218.64 4.500 72.43 0.00 72.43 Pass
8727,94 4283.52 8725.00 4340.48 24.48 24.00 235.11 218.24 4.500 72.53 0.00 72.53 Pass
8754,11 4283.09 8750.00 4340.44 24.13 23.64 232,83 217.53 4.500 72.33 0.00 72.33 Pass
e e
Sperry-Sun
Anticollision Report
Company: BP Amoco Date: 10/06/2003 Time: 14:53:24 Page: 5
Held: Milne Point
Reference Site: M Pt S Pad Co-ordinate(NE) Reference: .. Well: MPS-Q1, True North
Reference Well: MPS-01 Vertical (TVD) Reference: MPS-Q1: 72.5
Reference Wellpath: Plan MPS-01 L2 Db: Oracle
Site: M PtS Pad
Well: MPS-01 Rule Assigned: NOERRORS
Wellpath: MPS-01 L 1 V3 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset Tli'O+AZI TFO-HS CasingIH!ÐistaJice Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
8780.22 4282.63 8775.00 4340.41 23.75 23.27 230.11 216.38 4,500 71.77 0.00 71.77 Pass
8806.23 4282.17 8800.00 4340.41 23.37 22.88 226.99 214.82 4,500 70.95 0.00 70.94 Pass
8832.13 4281.70 8825.00 4340.42 22.96 22.48 223.45 212.83 4.500 69,89 0.00 69.89 Pass
8857.86 4281.22 8850.00 4340.26 22.56 22.07 219.44 210.37 4,500 68.44 0.00 68.44 Pass
8883.38 4280.73 8875.00 4339.90 22.13 21.64 214.85 207.30 4.500 66,61 0.00 66.61 Pass
8908.63 4280.23 8900.00 4339.95 21.71 21,21 209.33 203.30 4.500 65.04 0.00 65,04 Pass
8933.54 4279.73 8925.00 4340.49 21.27 20.76 202.83 198.29 4.500 64.01 0.00 64.01 Pass
8958,04 4279.22 8950.00 4341.54 20.84 20.31 195.33 192.27 4.500 63.79 0.00 63.79 Pass
8982.08 4278.72 8975.00 4343.03 20.40 19.86 187.11 185.49 4.500 64.62 0.00 64.62 Pass
9005.69 4278.22 9000.00 4344.73 19.96 19.40 178.60 178.39 4.500 66.55 0.00 66.55 Pass
9028.89 4277.72 9025.00 4346.69 19.52 18.95 170,21 171.40 4.500 69.77 0.00 69.77 Pass
9051.77 4277 .21 9050,00 4349.10 19.08 18.50 162.53 165.09 4.500 74.41 0.00 74.41 Pass
9074.40 4276,71 9075.00 4351.71 18.64 18.05 155.65 159,57 4,500 80.06 0.00 80.06 Pass
9096.81 4276.20 9100.00 4354,21 18.19 17.61 149.48 154.74 4.500 86.28 0,00 86.28 Pass
9118.97 4275.69 9125.00 4356.38 17.75 17.16 143.77 150.36 4.500 92.86 0.00 92,86 Pass
9140.83 4275.19 9150.00 4358.01 17,31 16.72 138.32 146.22 4.500 99.68 0.00 99.67 Pass
9162.37 4274,68 9175.00 4359.10 16.87 16.28 133.08 142.28 4.500 106,75 0.00 106.75 Pass
9183.57 4274.18 9200.00 4359.65 16.44 15,84 128.05 138.52 4.500 114.12 0.00 114.12 Pass
9204.26 4273.69 9225.00 4359.80 16.02 15.40 123.14 134.86 4.500 122,12 0.00 122.12 Pass
9224.32 4273.20 9250.00 4359.69 15.60 14,98 118.39 131.31 4.500 131.06 0.00 131.06 Pass
9243.86 4272.73 9275.00 4359.51 15,20 14.56 113.96 128.05 4.500 140,84 0.00 140.84 Pass
9262.95 4272.26 9300.00 4359.35 14.82 14,16 109.90 125.13 4.500 151.36 0.00 151.36 Pass
9281.59 4271.80 9325.00 4359.17 14.44 13.77 106.17 122.52 4.500 162.56 0.00 162.56 Pass
9300.00 4271.35 9350.00 4358,99 14.07 13.40 102,72 120,18 4.500 174.37 0.00 174.37 Pass
9317,60 4270.91 9375,00 4358.79 13.72 13.05 99.57 118.09 4.500 186.70 0.00 186.70 Pass
9334.98 4270.47 9400,00 4358.61 13.38 12.70 96.66 116.22 4,500 199,56 0,00 199.56 Pass
9350.00 4270.10 9425.00 4358,68 13.08 12.41 94.12 114.58 4.500 213.21 0,00 213,20 Pass
9368.09 4269,64 9450.00 4359,02 12.75 12.05 91.59 113.13 4.500 227.57 0.00 227,56 Pass
9383,95 4269.24 9475.00 4359.61 12.45 11.74 89.40 111.89 4.500 242.43 0.00 242.43 Pass
9400.00 4268,83 9500.00 4360.41 12.16 11.44 87.36 110.82 4.500 257.70 0.00 257,70 Pass
9414.57 4268.46 9525.00 4361.15 11.91 11.18 85.50 109.84 4.500 273,21 0.00 273.21 Pass
9429.32 4268.08 9550.00 4361.88 11.66 10.93 83,72 108.94 4.500 289.06 0.00 289.05 Pass
9443.50 4267.72 9575.00 4362.85 11.42 10.70 82.08 108.15 4,500 305.53 0.00 305.53 Pass
9457.16 4267.37 9600.00 4364.08 11.21 10.49 80,56 107.45 4.500 322.55 0.00 322.55 Pass
9470.50 4267.03 9625,00 4365.69 11.02 10.28 79.19 106.88 4.500 339,85 0.00 339.85 Pass
9483.51 4266.69 9650.00 4367.42 10.84 10.10 77.90 106.38 4.500 357.40 0.00 357.40 Pass
9500,00 4266.27 9675,00 4368.91 10,60 9.88 76.40 105.86 4.500 375,21 0,00 375.21 Pass
9508.37 4266.05 9700.00 4370,20 10.51 9,79 75.40 105.36 4.500 393.25 0.00 393,25 Pass
9520.17 4265.75 9725.00 4371.36 10.37 9.65 74.20 104.87 4.500 411.64 0.00 411,64 Pass
9531,63 4265.45 9750.00 4372.54 10.24 9.53 73.06 104.42 4.500 430.28 0.00 430.27 Pass
9550.00 4264.97 9775.00 4373.86 10.04 9.34 71,54 104.00 4.500 449.19 0.00 449.18 Pass
9550.00 4264.97 9800.00 4374.96 10.04 9.38 71.14 103.61 4.500 468.27 0.00 468.27 Pass
9563.78 4264,62 9825.00 4375.66 9.93 9.26 69,87 103.16 4.500 487.79 0.00 487.79 Pass
9573.54 4264.37 9850.00 4376.56 9.85 9.19 68.89 102,77 4,500 507.73 0.00 507.73 Pass
9582.92 4264.12 9875.00 4377.85 9.78 9.13 68,00 102.44 4.500 528.01 0.00 528.01 Pass
9600.00 4263.68 9900.00 4379.31 9.64 9.02 66.67 102.14 4,500 548.64 0,00 548,64 Pass
9600.00 4263,68 9925.00 4380.85 9,64 9.04 66.42 101.88 4.500 569,28 0,00 569.28 Pass
9609.22 4263.44 9950.00 4382,37 9.60 9.00 65.61 101.63 4.500 590.13 0.00 590.13 Pass
9617.53 4263.23 9975,00 4383.79 9.55 8.97 64.87 101.38 4.500 611.07 0.00 611.07 Pass
9625.60 4263.02 10000.00 4384.79 9.51 8.95 64.11 101.11 4.500 632.10 0.00 632.10 Pass
9633.45 4262.82 10025,00 4385.37 9.47 8.93 63.35 100.82 4.500 653.20 0.00 653.20 Pass
e e
Sperry-Sun
Anticollision Report
Company: BP Amoco Date: 10106/2003 Time: 14:53:24 Page: 6
Field: Milne Point
Reference Site: MPtSPad Co-ordinate(NE) Reference: Well: MPS-01, True North
Reference Well: MPS-01 Verücai (TVD) Reference: MPS-01: 72.5
Reference Wellpath: Plan MPS-01 L2 Db: Oracle
Site: M PtS Pad
Well: MPS-01 Rule Assigned: NOERRORS
Wellpath: MPS-01L 1 V3 Inter-Site Error: 0.00 ft
Reference Offset Seoù-Ml\Ïor Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H!.Ðistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
9645.76 4262.50 10050.00 4385,67 9.41 8.89 62.30 100.51 4.500 674.35 0,00 674.35 Pass
9650.78 4262.37 10075.00 4385.73 9.43 8.92 62.01 100.22 4.500 695.48 0.00 695.48 Pass
9663.63 4262.04 10100.00 4385.74 9.46 8.94 61.73 99.94 4.500 716,65 0,00 716.65 Pass
9676.48 4261.71 10125.00 4385.66 9.49 8.97 61.46 99.67 4.500 737,82 0.00 737.82 Pass
9689,33 4261.38 10150.08 4385.46 9.52 8.99 61.20 99.41 4.500 759.08 0.00 759.08 Pass
9702.25 4261.05 10175.00 4385.39 9.55 9.01 60.96 99,17 4,500 780.16 0.00 780,16 Pass
9715.49 4260.71 10200.00 4385.72 9.59 9.03 60.77 98,98 4.500 801.19 0.00 801.19 Pass
9728.87 4260.36 10225.00 4386.59 9.63 9.05 60.62 98.83 4.500 822.21 0.00 822,21 Pass
9742.18 4260.02 10250.00 4388.19 9.66 9.08 60.53 98.74 4.500 843.33 0.00 843,33 Pass
9755.45 4259.68 10275.00 4390.16 9.70 9.10 60.47 98,68 4,500 864.50 0.00 864.50 Pass
9768.75 4259,34 10300.00 4392.12 9.73 9.13 60.42 98.63 4.500 885.65 0,00 885.65 Pass
9782.09 4258.99 10325.00 4394.00 9.77 9.16 60.36 98.57 4.500 906.78 0,00 906,77 Pass
9795.47 4258.65 10350.00 4395.78 9.80 9.19 60.29 98.50 4.500 927.87 0.00 927,86 Pass
9808.86 4258.30 10375.00 4397.68 9.85 9.21 60.24 98.45 4.500 948.96 0.00 948,96 Pass
9822.22 4257.96 10400.00 4399.82 9.89 9.24 60.20 98.41 4.500 970.08 0.00 970.08 Pass
9835.57 4257.62 10425.00 4401.97 9.94 9.26 60.17 98.38 4.500 991.21 0.00 991,21 Pass
9848.93 4257.27 10450.00 4404.04 9.99 9.29 60.13 98.34 4,500 1012.33 0.00 1012.33 Pass
9862.30 4256.93 10475.00 4406.02 10.03 9.31 60.09 98.30 4.500 1033.44 0.00 1033.44 Pass
9875.66 4256.59 10500.00 4407.99 10.08 9,33 60.05 98.26 4.500 1054,56 0.00 1054.56 Pass
9889,03 4256.24 10525.00 4409,95 10,12 9.34 60.01 98.22 4.500 1075.67 0.00 1075.67 Pass
9891.70 4256.17 10530.00 4410.35 10.13 9.35 60.00 98.21 4.500 1079.90 0.00 1079.90 Pass
Site: M PtS Pad
Well: MPS-01 Rule Assigned: NOERRORS
Wellpath: MPS-01 PB1 V7 Inter-Site Error: 0.00 ft
Reference Offset Seoù-Major Axis Ctr-Ctr No-C.o Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H!.Ðistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
7490.03 4223.81 7525.00 4165.65 25.26 26.69 101.52 65.06 9.875 159.15 0.00 159,15 Pass
7517.50 4236.82 7550.00 4175,37 25.25 26.72 102.21 65,75 9,875 167.32 0.00 167.32 Pass
7545.24 4248.53 7575.00 4185.07 25.25 26.75 103.19 66.71 9.875 174.72 0.00 174.72 Pass
7573.06 4258.78 7600.00 4194,73 25.26 26.79 1 04.43 67.93 9.875 181.38 0.00 181.38 Pass
7600.72 4267.46 7625,00 4204.39 25.27 26.84 105.95 69.45 9.875 187.49 0.00 187.49 Pass
7627.93 4274,50 7650.00 4214.11 25.30 26.89 107.79 71.28 9.875 193.36 0.00 193.36 Pass
7654.52 4279.92 7675.00 4223.87 25.33 26.95 109.90 73.38 9.875 199.10 0.00 199.09 Pass
7680.34 4283.80 7700,00 4233.69 25.37 27.02 112,26 75.73 9.875 204.84 0.00 204.84 Pass
7705.39 4286,23 7725.00 4243.44 25.42 27.11 114.79 78.24 9.875 210.56 0.00 210.56 Pass
7729.66 4287.34 7750.00 4253.07 25.48 27.20 117.43 80.88 9.875 216,26 0,00 216.26 Pass
7751,91 4287.73 7775.00 4262.58 25.54 27.31 120,05 83.50 9.875 222.09 0,00 222.09 Pass
7774.19 4288,12 7800.00 4271.97 25,60 27.42 122.49 85.94 9.875 228.15 0.00 228.15 Pass
7796.48 4288.50 7825.00 4281.32 25.66 27.53 124,80 88.24 9.875 234.61 0.00 234.61 Pass
7818.76 4288.89 7850.00 4290.63 25.72 27.64 126.96 90.41 9.875 241 ,50 0,00 241.50 Pass
7841,03 4289.28 7875.00 4299.91 25.78 27.75 129.00 92.45 9.875 248,78 0.00 248.78 Pass
7863.30 4289.67 7900.00 4309.17 25.85 27.86 130.91 94.36 9.875 256,38 0,00 256,38 Pass
7885.61 4290.05 7925.00 4318.43 25.91 27.96 132.72 96,17 9,875 264.15 0.00 264.15 Pass
7907.94 4290.44 7950.00 4327.70 25.97 28,07 134.42 97.87 9.875 272.05 0.00 272,05 Pass
7930.31 4290.83 7975.00 4336.98 26.04 28.17 136.04 99.49 9.875 280.06 0.00 280.06 Pass
7952.78 4291.22 8000.00 4346,06 26.10 28.28 137.52 100,97 9,875 288.19 0.00 288.19 Pass
7975.41 4291.62 8025.00 4354,70 26.17 28.39 138.84 102,29 9,875 296.41 0.00 296.41 Pass
7993.16 4291.92 8050.00 4362.88 26.08 28.33 139.06 103.47 9.875 304.79 0.00 304.79 Pass
8000.00 4292,03 8075.00 4370.61 26.01 28.32 139.39 1 04.48 9.875 313.90 0.00 313.90 Pass
8022,52 4292.33 8100,00 4377.98 25.69 28.01 138.02 105.35 9.875 323.57 0.00 323.57 Pass
- e
Sperry-SUD
Anticollision Report
Company: BP Amoco Date: 10/0612003 Time: 14:53:24 Page: 7
Field: Milne Point
Reference Site: M PtS Pad Co-ordinate(NE) Reference:. Well: MPS-01, True North
Reference Well: MPS-01 Vertical (TVD) Reference: MPS-01: 72.5
Reference Wellpath: Plan MPS-01 L2 Db: Oracle
Site: MPtSPad
Well: MPS-01 Rule Assigned: NOERRORS
Wellpath: MPS-01PB1 V7 Inter-Site Error: 0,00 ft
Reference Offset Semi-Ml\ior Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS CasingIH!Ðistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
8036.71 4292.49 8125.00 4385.02 25.49 27.84 137.32 106.07 9.875 334.38 0.00 334.38 Pass
8050.00 4292.60 8150,00 4391.73 25.31 27.67 136.57 106.64 9.875 346.10 0.00 346.10 Pass
8063.91 4292,70 8175.00 4398.07 25,06 27.46 135.63 107.09 9.875 358.64 0.00 358.64 Pass
8077.04 4292.77 8200.00 4403.84 24.83 27.26 134.62 107.39 9.875 371.61 0.00 371.61 Pass
8089.89 4292.81 8225.00 4408,99 24.60 27.05 133.52 107.57 9.875 384.91 0.00 384,91 Pass
8100.00 4292,83 8250.00 4413.52 24.42 26.90 132.57 107.63 9.875 398.54 0.00 398,53 Pass
8114.75 4292.83 8275,00 4417.51 24.11 26.60 131.07 107.59 9,875 412.48 0.00 412.48 Pass
8126.62 4292,80 8300.00 4421.29 23.86 26.37 129,80 107.51 9.875 427.00 0.00 427.00 Pass
8138,08 4292.76 8325.00 4424.88 23.62 26.15 128.54 107.39 9,875 442.06 0.00 442.06 Pass
8150.00 4292.70 8350.00 4428.27 23.37 25.89 127,19 107.23 9.875 457.65 0,00 457.65 Pass
8159.80 4292,63 8375.00 4431.32 23.14 25,69 126,01 107.03 9.875 473.65 0.00 473.64 Pass
8174.69 4292.50 8400,00 4433.82 22.79 25,30 124,26 106,76 9.875 489.95 0,00 489.95 Pass
8183.48 4292,37 8425.00 4435.77 22.80 25.39 123.89 106.45 9.875 506.40 0.00 506.40 Pass
8202.04 4292.07 8450,00 4437.16 22.86 25.49 123,55 106,11 9.875 522.87 0.00 522.87 Pass
8220.55 4291.77 8475.00 4438.32 22.92 25.59 123.21 105.77 9.875 539.37 0.00 539.37 Pass
8238.99 4291.47 8500.00 4439.44 22.98 25,69 122.88 1 05.44 9.875 555.95 0.00 555.95 Pass
8257.36 4291.17 8525.00 4440.53 23.04 25.79 122.56 105.12 9.875 572.62 0.00 572.62 Pass
8275,67 4290.87 8550.00 4441.60 23.09 25.88 122.26 104.82 9.875 589.37 0.00 589,37 Pass
8293.98 4290.57 8575.00 4442.92 23.15 25.96 122.00 104.56 9.875 606.17 0.00 606.17 Pass
8312.31 4290.28 8600.00 4444.54 23.21 26.04 121.78 104.34 9.875 623,01 0,00 623.01 Pass
8330.64 4289.98 8625.00 4446.45 23.27 26.12 121.59 104.16 9.875 639.88 0.00 639.88 Pass
8348,97 4289.68 8650.00 4448.60 23.33 26.20 121.44 104.00 9.875 656,80 0,00 656.80 Pass
8367.21 4289.38 8675.00 4450.80 23.39 26.28 121.30 103.86 9.875 673.82 0.00 673.82 Pass
8385.36 4289.09 8700.00 4453.05 23.45 26.36 121.17 103.73 9.875 690.94 0.00 690.94 Pass
8403.42 4288.80 8725.00 4455,35 23.51 26.44 121.04 103.60 9,875 708.16 0.00 708.16 Pass
8421.39 4288.50 8750.00 4457.38 23.57 26.54 120,90 103.46 9.875 725.44 0.00 725.44 Pass
8439.29 4288.21 8775.00 4458.74 23.63 26.63 120.71 103.28 9.875 742.72 0.00 742.72 Pass
8457.38 4287.92 8800.00 4459.70 23.69 26,73 120,51 103.07 9.875 759.77 0.00 759,77 Pass
8475.78 4287,62 8825.00 4460.40 23.75 26.82 120.30 102.86 9.875 776.46 0.00 776.46 Pass
8494,27 4287.32 8850.00 4461.38 23.81 26.90 120,12 102.68 9.875 793.10 0.00 793,10 Pass
8512.76 4287.02 8875.00 4462.91 23.88 26,98 119.98 102.55 9.875 809.82 0.00 809.82 Pass
8531.24 4286.72 8900.00 4465.00 23,94 27.06 119.89 1 02.46 9,875 826.61 0.00 826.61 Pass
8549.72 4286.42 8925.00 4467.58 24.00 27.14 119,84 1 02.40 9.875 843.43 0.00 843.43 Pass
8568.33 4286.12 8950.00 4470.18 24.07 27.22 119.80 102.36 9.875 860,10 0,00 860.10 Pass
8587.04 4285.81 8975.00 4472.79 24.13 27.30 119.75 102.32 9.875 876.68 0.00 876.67 Pass
8605.65 4285.51 9000.00 4475,58 24.20 27.39 119,72 102.29 9.875 893.37 0.00 893.37 Pass
8624.16 4285,21 9025.00 4478.49 24.27 27.47 119.70 102,26 9.875 910.17 0.00 910.17 Pass
8642.75 4284.91 9050,00 4480.88 24.33 27.57 119.65 102.21 9.875 926.86 0.00 926.86 Pass
8661.47 4284,60 9075.00 4482,56 24.40 27.67 119,55 102.11 9.875 943.36 0.00 943.36 Pass
8680.32 4284.30 9100.00 4483.40 24.47 27.77 119.41 101.98 9.875 959.61 0.00 959.61 Pass
8699.26 4283.99 9125.00 4483.53 24.53 27.87 119.24 101.80 9.875 975.67 0.00 975.67 Pass
8718.18 4283.68 9150.00 4483.48 24.60 27.97 119,06 101.62 9.875 991.72 0.00 991,72 Pass
8727.61 4283.53 9175.00 4483.25 24.48 27.86 118.32 101.43 9.875 1007,82 0.00 1007,82 Pass
8736.83 4283.38 9200.00 4482.69 24.36 27.75 117.56 101.23 9.875 1023.87 0.00 1023.86 Pass
8750.00 4283.15 9225.00 4481,89 24.19 27.53 116.56 101.01 9.875 1039,85 0,00 1039.85 Pass
8750,00 4283.15 9250.00 4480.97 24.19 27.62 116.36 100.81 9,875 1055.74 0.00 1055.74 Pass
8764.09 4282.91 9275.00 4479,91 23.98 27.38 115.29 100,59 9.875 1071,64 0,00 1071.64 Pass
8772.93 4282.76 9300.00 4478.68 23.86 27.25 114.55 100.38 9.875 1087.77 0.00 1087.77 Pass
8781.84 4282.61 9325.00 4477.41 23,73 27.11 113.81 100.17 9,875 1103.56 0.00 1103.56 Pass
8800.00 4282.28 9350.00 4476.19 23.46 26.74 112.51 99.97 9.875 1118.85 0.00 1118.85 Pass
8800.00 4282.28 9375.00 4474.92 23,46 26.81 112.33 99.79 9.875 1133.58 0.00 1133.58 Pass
e Sperry-SUD e
Anticollision Report
Company: BPAmoco Date: 1010612003 Time: 14:53:24 Page: 8
Field: Milne Point
Reference Site: MPtSPad Co-ordinate(NE) Reference: Well: MPS-01, True North
Reference Well: MPS-01 Vertical (TVD) Reference: MPS-01: 72.5
Reference Wellpath: Plan MPS-01 l2 Db: Oracle
Site: M PtS Pad
Well: MPS-Q1 Rule Assigned: NOERRORS
Wellpatb: MPS-01 PB1 V7 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis .. Ctr-Ctr No-Go Allowable
MD TVD MD.·· TVD Ref Offset TFO+AZI TFO-HS CasinglH!Ðistance Area Deviation Warning ..
ft ft ft ft ft ft deg deg in ft ft ft
8800.00 4282.28 9400.00 4473,56 23.46 26.89 112.16 99.61 9,875 1148,21 0,00 1148.21 Pass
8818.34 4281.95 9425.00 4472.18 23.18 26.50 110.86 99.42 9.875 1162.79 0.00 1162.79 Pass
8827.31 4281.79 9450.00 4470.79 23.04 26.35 110.15 99,24 9.875 1177.59 0.00 1177.59 Pass
8850.00 4281.37 9475.00 4469.50 22.69 25.83 108.60 99.06 9.875 1192.29 0.00 1192.29 Pass
8850.00 4281,37 9500.00 4468,39 22.69 25.90 108.46 98.91 9,875 1206.33 0.00 1206.33 Pass
8850.00 4281,37 9525.00 4467.70 22.69 25.96 108.34 98.79 9.875 1220,32 0.00 1220,32 Pass
8850.00 4281,37 9550.00 4467.47 22.69 26.02 108.25 98.70 9.875 1234.37 0.00 1234.37 Pass
8872.58 4280.93 9575,00 4467.74 22.31 25.46 106.80 98.61 9.875 1248.38 0.00 1248.38 Pass
8881.39 4280,76 9600.00 4468.51 22.17 25.28 106,21 98.55 9.875 1262.91 0.00 1262.91 Pass
8900.00 4280.40 9625,00 4469.72 21.86 24,82 105.05 98.50 9.875 1277.95 0.00 1277.95 Pass
8900.00 4280.40 9650,00 4471.37 21.86 24.88 105.04 98.49 9.875 1292.70 0.00 1292.70 Pass
8900.00 4280.40 9675.00 4473.40 21.86 24.95 105.06 98.51 9.875 1306,60 0,00 1306.60 Pass
Site: M PtS Pad
Well: MPS-07 Rule Assigned: Major Risk
Wellpath: MPS-07 V9 Inter-Site Error: 0,00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO~HS CasingIH!Ðistance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
9935.65 4255.04 8100.00 4148.67 10.30 9,17 236.51 274.71 7.000 1294.53 80.11 1214.42 Pass
9934.91 4255.06 8125,00 4168.06 10.30 9,19 235.70 273.91 7.000 1277.34 80.43 1196.91 Pass
9934.13 4255.08 8150,00 4187.63 10.29 9.21 234.86 273.07 7.000 1260,62 80.76 1179.86 Pass
9933.30 4255,10 8175.00 4207.38 10.29 9.23 233,99 272.20 7.000 1244.40 81.10 1163.30 Pass
9932.44 4255.13 8200,00 4227.28 10.29 9.25 233.09 271 ,30 7.000 1228.68 81.45 1147.22 Pass
9931.61 4255.15 8225.00 4247.22 10.28 9.27 232.16 270.37 7.000 1213.32 81.82 1131.50 Pass
9930.80 4255.17 8250.00 4267.20 10,28 9.29 231.21 269.42 7,000 1198,33 82.19 1116,14 Pass
9930.02 4255.19 8275.00 4287,22 10.28 9.31 230.24 268.45 7.000 1183.72 82.57 1101.15 Pass
9929.27 4255.21 8300.00 4307.24 10.28 9.33 229.24 267.45 7.000 1169.48 82.98 1086,50 Pass
9928.57 4255.23 8325.00 4327.24 10.27 9.35 228.22 266.43 7.000 1155.57 83.39 1072.18 Pass
9927.91 4255.24 8350,00 4347.21 10.27 9.37 227.17 265.38 7.000 1141.99 83.80 1058.19 Pass
9927,30 4255,26 8375.00 4367.15 10.27 9.39 226,10 264.31 7.000 1128.77 84.22 1044.54 Pass
9926.67 4255,27 8400.00 4387.11 10.27 9.41 225.00 263.21 7,000 1115,97 84.65 1031.32 Pass
9926.00 4255.29 8425.00 4407.12 10.26 9.43 223.88 262.09 7.000 1103.66 85.08 1018.58 Pass
9925.27 4255.31 8450.00 4427.17 10.26 9.45 222.73 260.94 7.000 1091.85 85.51 1006,34 Pass
9924.49 4255.33 8475.00 4447.27 10.26 9.47 221.56 259.77 7.000 1080.56 85,94 994,62 Pass
9923.73 4255.35 8500.00 4467.42 10.25 9.49 220,35 258.56 7.000 1069.82 86.36 983.45 Pass
9923.00 4255.37 8525.00 4487.62 10.25 9.51 219.12 257.33 7.000 1059.64 86,79 972.85 Pass
9922.31 4255,39 8550.00 4507,88 10.25 9.53 217,87 256.08 7.000 1050.04 87.21 962.82 Pass
9921.65 4255.40 8575.00 4528.19 10.25 9.55 216.59 254,80 7.000 1041.03 87.63 953.40 Pass
9921 ,01 4255.42 8600.00 4548,56 10.24 9.57 215,29 253.50 7.000 1032.63 88.05 944.58 Pass
9920.39 4255.44 8625.00 4568.97 10.24 9,59 213.97 252.18 7,000 1024.86 88.46 936.40 Pass
9919,77 4255.45 8650.00 4589.40 10.24 9.60 212.63 250.84 7.000 1017.67 88.79 928.89 Pass
9919.16 4255.47 8675,00 4609.83 10.24 9.62 211.27 249.48 7,000 1011.05 89.12 921.94 Pass
9918.67 4255,48 8694.80 4626.01 10.23 9.63 210.18 248.39 7.000 1006.22 89,38 916,84 Pass
J
J
J
J
J
e
e
Per Alaska Oil and Gas Conservation Commission Regulation 20 AA 25,005 Permit
to Drill sub section 14 (e) if a well has multiple well branches, each branch requires
a separate Permit to Drill. If multiple well branches are proposed from a single
conductor, surface pr production casing, the applicant shall designate one branch as
the primary Wellbore and include all information required under (c) of this section
that is unique to that branch and need not include the $100 fee.
·
e
TRANSMIT AL LETTER CHECKLIST
CIRCLE APPROPRIATE LETTERIP ARA GRAPH S TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME I??Pt{ .5-Ó/I-2-
PTD# 2L::ß -/be¡
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
.,
V/
(If API number
last two (2) digits
are between 60-69)
"CLUE"
Tbe permit is for a new wellbore segment of
existing well P1P£1.- ~.,- 0 I . -6 ~ -2-3/ tlf -ÕÒ
Permit NO,203-òif~1 No. 5"0 .
Productionsbould continue to be reported as
a function· of the original API number, stated
above.
HOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for tbe pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API Dumber (50
70/80) from records, data and logs acquired
for well (name on permit).
PILOT
(PH)
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\jody\templates
Tbe permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Companv Name) assumes the liability of any
protest to tbe spacing . exception that may
occur.
All dry ditcb sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from wbere samples are first caught and
10' sample intervals tbrough target zones.
WELL PERMIT CHECKLIST Field & Pool MILNE POINT, SCHRADER BLFF OIL - 525140 Well Name: MILNE PT UNIT SB S-01L2 Program DEV Well bore seg ~
PTD#:2031690 Company BP EXPLORATION (ALASKA) INC Initial Classrrype DEV I PEND GeoArea 890 Unit 11328 On/Off Shore On Annular Disposal 0
Administration 1 PenniUeE1 attached _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ _l.aJE1ral:_ ootJE1qUiJE1d_p_er 20_MC 25_.Q05._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2 _LeasenumbE1r _appropriate _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3 _UJliqUE1 wellnameaod Olunb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4 WeJlJocated in_a_d_efioedpooL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5 WeU located propE1r _distaoceJrom driJling unit boundary_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6 WeUlocated propE1rdistançeJrom other wells_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7 _S_uffícient acreage_aYailable in_dJilJiog unit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
8 Jfdeviated. isweJlborE1 plaUncJuded _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
9 _Ope(ator only affected party _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
100pe(ator has_appropriate_bond iJlJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
11 Permit GaO be issued without coMervaJion ordE1r _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ YeL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Appr Date 12 Eer:mitGaO be issued without admini!¡t(atille_apprpvaJ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
SFD 10/8/2003 13 _C_ao permitbe approved bE1fore _15-day_ wajt _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
14 WellJocated within area and_strata authorized byJojectioo Order # (putiO# in_cPmmeotsUFQr_ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
15 _AJI welJswithinJI431Jile_area_of review ideotified (FpUiervicewell only>- _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
16 PJE1-produ_cediojector; duratioRofpre-productioolessthan_3months(ForselYicewellonJy) _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
17 ACMPFïndjng9fCon$isteocy_haS bE1eJljssUE1dJorJhis prolect _ _ _ _ _ _ _ _ _ _NA _ _l.a_teralfrom_existingwelJ,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
18 _C90du_ctor!¡tringpJovided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _Con_ductorwassetjnmotherÞore._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
19 _S_urfacecasingprQtecJs.aILknownUSDWs _ . _ _ _ _ _. .. _ _ _ _ _ _ _ NA. _ _ _ _ _ _,6.llaquifersexempted 40 Cfß:l47,1021b)(3) _ _ _ _. _ ...... _ _ _ _ _...... _ _ _ ....._
20 _CMTvoladeQu_ateJocirc.ulate.oJl_cond_uctor.&!¡urtCSg _.... _ _ _ _ _ _ _. Yes_ _ _ _.. .Surta~çasiJlginmotherborewa!¡cementedto_s_urfac.e, _ _ _ _ _...... _ _ _ _ ...... _ _ _ _..... _ __
21CMT vol adeQuateJo tie-in long $triog to_sur:f csg. . . _ _ _ _ _ . . . . . _ _ _ _ _ . . . . _ _ _ _ No . . _ _ _ _ _ Z -518" produçtjoJl.casing wa_s _not cemeoted tosur:face._ CemenJed_satisfactorily,. . _ _ _ _ _ . . . . . _ _ _ _ .
22 _CMTwill coyer_aU kOQwnpro.duçtiye bQrizons_ _ _ _ _ . _ . . . . _ _ _ _ _ . _ . . . . _ _ _ _ . . . . No_ _ _ _ _ . . . SloUedJiOE1r plaooe_d, _ _ _ _ . _ _ _ _ _ _ . . . . _ _ _ _ _ . . . . . . _ _ _ _ _ _ . _ _ _ _ _ . . . . _ _ _ _
23 _Casiog de.si.gos adeQuate for C.T4 B_&_permafrost . . . _ _ _ _ _ . . . . . . . _ _ _ _ . . . . . Yes _ ...... _ _ _ _ . . . . . _ _ _ _ . . . . . . . . _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . . _ _ _ _ _ . . . . . . _ _ _ _ _ _ . . . . _ _ _
24 Adequate.tan.kage_orre_selYepit.. _ _ _ _ _.... _ _ _ _. _.... _ _... Yes.. _ _ _ _ _ßigise.quippe_dwithsteel_plÌ!¡._NQreseJllepjtplaooed, All wa!¡teto_Class Jlw.elJ(s), _ _....... _ _ _ _.
25 Jtare-dríll4has_a10-403fQrabandonmentbeeoapproved _ _..... _ _ _. _.... _ _ NA..... _ _l.aJeralfrom.existlngwelJ..NQr:>&AinvoJved._... _ _ _ _....... _ _ _ _ _....... _ _ _. _.... _ _ __
26 Adequatewellbore separatioJlpropo!¡ed _ _ _ . . . . _ _ _ _ . . . . . . _ _ _ _ _ _ . . Yes _ . \o bazardsideotifiecLNearest weJI!¡ are themQther bore aod fir!¡t Ja_teral. _... _ _ _ _ _ _ .
27 Jtdiverter req.uired, does itmeet reguJations. . . _ _ _ _ . . . . _ _ _ _ _ _ . . . . . . . _ _ .... NA _ _ _ . _ _ . . . _ _ _ _ . . . . . _ _ _ _ _ . _ . . . . . . _ _ _ _ _ . . . _ _ _ _ _ _ _ . . . . . _ _ _ _ _ . . . . . . _ _ _ _ _ . . . . . . _
28 DrilJiog fluid. program schematic.&equiplistadequate_ . _ . _ _ _ _ _ _ .... _ _ _ _ . . . Yes _ _ _ _ _ _ . Maxjmum BHP 8.2_EMW._ Planned mud weigbt9.5ppg. _ _ _ _ _ _ . . . . . _ _ _ _ _ _ . . . . . . _ _ _ _ _ .
29 _BQPEs._dojhey meetreguJation _ . . . . . _ _ _ _ . . . . . _ _ _ . . . . . . _ _ _ _ _ _ . _ _ _ Yes. . . . . _ _ _ _ _ _ . . . _ _ _ _ _ . . . . . _ _ _ _ _ _ . . _ _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . . _ _ _ _ _
30 BQPEwess raJiog appropriate; JesHo_(pu_t p!¡ig in.commeoÌ!¡). . . . _ _ _ _ _ . . . . . _ _ _ _ . . Yes _ _ _ _ _ _ . CalçuJaJed_MASP. 1379 P!¡í._ Plaon_ed ßOP.test pressure.3.50Q psJ._ _ . . . . . . _ _ _ _ . . . . . . . _ _ _ _ _ . . . . _
31C_hokemanjfold compJies w/APIR~-53 (May 84)_ _ _ _ _ _ . . _ _ _ _ Yes _ _ _ _ . . . . . _ _ _ _ .... _ _ _ _ _ _ _ . . . . . _ _ _ _ _ _ . . . . . _ _ _ _ _ . . . . . . _ _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . _ _ _
32 WQrk will occur withoutoperation _sbutdow.n. . . _ _ _ _ _ . . . . . _ _ _ _ _ _ . . . . . _ _ _ _ . . . Yes _ _ _ _ . . . . . . . _ _ _ _ . . . _ _ _ _ _ . _ . . . . . _ . _ _ . . _ _ _ _ _ _ . . . . . _ _ _ _ _ _ _ . . . . . _ _ _ _ _ . . . . . _ _
33 Js preseoçe of H2S gas_ prob.able. _ _ _ _ _ . . . _ _ _ _ . . . . _ _ _ _ _ _ . _ _ _ . . _ _ _ _ . No. _ _ _ _ _ _ . . . _ _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . . . _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . . _ _ _ _ _ _ . . _ _ _ _ _ . . . . . . _ _
34 Mecha.nlcaLq)J')djtioo pf wells wtthio ,6.0ß YE1rified (for.s_ervice welJ only) _ _ _ _ _ . . . . . . _ _ _ NA . . . . _ _ _ _ _ _ . . . _ . _ _ _ _ . . . . _ _ _ _ _ _ . . . . . . _ _ _ _ . . . . . . . _ _ _ _ _ . . . . . . . _ _ _ _ . _ . . . . _ _
Engineering
Appr Date
TEM 10/8/2003
61,?JJ. t'1:è(
Geology
Appr
SFD
Date
10/8/2003
Geologic
Commissioner:
Dt-~
'7
-
e
35 Permit GaO be issued wlQ hyd(ogen. s.ulfide measures. . . . _ _ . . . . . . . . _ _ _ _. _ _ . . _ Yes _ _ _ . . . . _ _ _ _ _ _ . . _ . _ _ _ _ . . . . _ _ _ _ _ _ _ _ . . . . _ _ _ _ _ . . . . . _ _ _ _ _ _ . _ . _ _ _ _ _ . . . . . _ _ _ _ _
36 D.ata_preseoted on. QOte_ntial overpressure _zooes. . . . . . . _ _ _ _ _ _ _ _ Yes. _ _ _ _ _ . Expeçted_ rese/'\{oir pressure is B,35 ppg EMW; will be drHled with_ 9.5 ppg.mud. _ _ _ _ _ . . . . _ _ _ _ _ . . . . _ _ _
37 _S_eismlcanalysJs. of sbaJlow gas.zooes_ _ . . . . _ _ _ . . . . . _ _ _ _ . . . . . . . _ _ _ _ NA _ _ _ . . . . . _ _ _ _ _ . . _ _ _ _ _ _ . . . _ _ _ _ . . . . . . . _ _ _ _ . _ . _ _ _ _ _ _ _ . . . . . _
38 Seabed .coodjtipo survey Jif off-shpre) _ _ _ _ . _ _ . . . . . _ _ _ _ . . . . . . _ _ _ _ _ . NA . _ _ _ _ _ _ . . . _ _ _ _ _ . . _ _ _ _ _ _ . . . . . . _ _ _ _ _ _ _ _ _ . . . . . . _ _ _ _ _ _ . . . . _ _ _ _ _ . . . . . . _
39 _ Contact namelphooeJor.weekly progress reports [exploratory 901y] . _ _ _ _ . . . . . _ _ _ NA . . . . . _ _ _ _ _ _ . _ . . _ _ _ _ . . _ _ _ _ . _ _ _ . . . . . _ _ _ _ _ _ . . _ _ _ _ . _ . . . . . _ _ _ _ .
Date: Engineering Date co:~~~oner ~;;; t:¡ / u:z...
¡Of 1-13 Co~'" -if VI 1'----
~
e
.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX,
No special effort has been made to chronologically
organize this category of information.
,
Sperry-Sun DrtlÞing Services
LIS Scan Utility
e
. ( ~
10 )_ \ \0 .
t~S)--\
$Revision: 3 $
LisLib $Revision: 4 $
Tue Mar 30 13:50:51 2004
Reel Header
Service name..... . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/03/30
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.. ............. . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date.................... .04/03/30
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-01 L2 PB1
500292314171
B. P. Exploration (Alaska) Inc
Sperry-Sun Drilling Services
30-MAR-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW0002714264
J. STRAHAN
D. FERGUSON
MWD RUN 9
MW0002714264
C. A. DEMOSK
C. DIXON
MWD RUN 10
MW0002714264
C.A. DEMOSKI
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
7
12N
11E
3375
4714
71.90
38.30
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6.125 7.625 7487.0
#
REMARKS:
e
e
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. THIS WELL WAS EFFECTED BY DRILLING OFF OF A
WHIPSTOCK POSITIONED
WITHIN THE RUN 4 INTERVAL OF MPS-01, THE TOP WAS AT
7487'MD/4222'TVD
AND THE BOTTOM WAS AT 7499'MD/4228'TVD.
4. MWD RUNS 9 AND 10 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS;
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4); AT-BIT INCLINATION
(ABI); AND PRESSURE
WHILE DRILLING (PWD). AS MWD RUN 9 WAS TO POSITION
THE WHIPSTOCK (AND
THE EWR SENSORS DID NOT EXIT THE CASING), ONLY SROP
AND SGRC DATA ARE
PRESENTED FOR THIS RUN.
5. LOG AND DIGITAL DATA (LDWG) ONLY WERE BLOCK-SHIFTED
1.5' DOWNHOLE,
PER E-MAIL FROM K. COONEY (SIS/BP) DATED 16 MARCH
2004. LOG HEADER
DATA RETAIN ORIGINAL DEPTH REFERENCES.
6. MWD RUNS 4 (PART), 9 AND 10 REPRESENT WELL MPS-01 L2
PB1 WITH API#:
50-029-23141-71. THIS WELL REACHED A TOTAL DEPTH
(TD) OF 10393'MD/
4223'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/30
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
START &H
7301.5
7463.5
7463.5
7463.5
7463.5
7463.5
7489.0
STOP DEPTH
10339.0
10346.0
10346.0
10346.0
10346.0
10346.0
10394.5
e
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
7301.5
10394.5
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
#
REMARKS:
GR
7300.0
10393.0
BIT RUN NO
4
9
10
MERGED MAIN PASS.
$
MERGE TOP
7300.0
7425.0
7447.5
MERGE BASE
7424.5
7510.0
10393.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record.. . . . . . . . . . . . Undefined
Absent value.................... ..-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Service Unit
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HOUR
MWD
MWD
MWD
MWD
MWD
MWD
MWD
Min
7301.5
0.5
26.77
0.16
0.16
0.12
0.04
0.2
Max
10394.5
464.37
113.05
1753.15
1535.98
2000
2000
4656.99
Mean
8848
150.474
74.9724
9.2712
11.0479
16.8503
21.7145
42.1962
First Reading For Entire File......... .7301.5
Last Reading For Entire File.......... .10394.5
Nsam
6187
5812
6076
5766
5766
5766
5766
5766
First
Reading
7301.5
7489
7301.5
7463.5
7463.5
7463.5
7463.5
7463.5
Last
Reading
10394.5
10394.5
10339
10346
10346
10346
10346
10346
e
File Trailer
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/30
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/30
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOl
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
2
e
header data for each bit run in separate files.
4
.5000
START DEPTH
7300.0
STOP DEPTH
7424.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
05-APR-03
Insite
66.37
Memory
7487.0
7300.0
7487.0
58.1
84.8
TOOL NUMBER
126027
9.875
3140.0
LSND
9.55
57.0
10.5
1200
5.6
4.100
2.930
64.0
92.4
MUD FILTRATE AT MT~
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value............. ........ .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
GR MWD040
4.700
3.000
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
API 4 1 68 4 2
Name Service Unit
DEPT FT
GR MWD040 API
Min
7300
37.66
Max
7424.5
97.83
Mean
7362.25
69.8168
First Reading For Entire File......... .7300
Last Reading For Entire File.......... .7424.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .04/03/30
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .04/03/30
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Nsam
250
250
.0
68.0
First
Reading
7300
7300
Last
Reading
7424.5
7424.5
header da_for
9
.5000
each bit run in separate ftltS.
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
START DEPTH
7425.0
7487.5
STOP DEPTH
7447.0
7510.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
15-0CT-03
Insite
66.37
Memory
7510.0
7487.0
7510.0
TOOL NUMBER
184054
6.125
3140.0
FLO-PRO
9.50
55.0
9.5
65000
4.4
.000
.000
.000
.000
.0
71.2
.0
.0
e e
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD090 FT/H 4 1 68 4 2
GR MWD090 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7425 7510 7467.5 171 7425 7510
ROP MWD090 FT/H 1 52.92 19.0172 46 7487.5 7510
GR MWD090 API 36.35 51.72 44.4553 45 7425 7447
First Reading For Entire File......... .7425
Last Reading For Entire File.......... .7510
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/30
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/30
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
4
header data for each bit run in separate files.
10
.5000
START DEPTH
7447.5
7462.0
7462.0
7462.0
7462.0
7462.0
7510.5
STOP DEPTH
10337.5
10344.5
10344.5
10344.5
10344.5
10344.5
10393.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
16-0CT-03
Insite
66.37
Memory
10393.0
7510.0
BOTTOM LOG INTERVAL (FT)4IÞ
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing................... ..60 .1IN
Max frames per record........... ..Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
10393.0
59.7
96.3
TOOL NUMBER
184054
159436
6.125
7499.0
FLO PRO
9.50
55.0
7.5
80000
3.8
.280
.200
.540
.260
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD100 FT/H 4 1 68 4 2
GR MWD100 API 4 1 68 8 3
RPX MWD100 OHMM 4 1 68 12 4
RPS MWD100 OHMM 4 1 68 16 5
RPM MWD100 OHMM 4 1 68 20 6
RPD MWD100 OHMM 4 1 68 24 7
FET MWD100 HOUR 4 1 68 28 8
Name Service Unit
DEPT FT
ROP MWD100 FT/H
Min
7447.5
0.5
Max
10393
464.37
Mean
8920.25
151. 523
Nsam
5892
5766
e
66.0
93.5
66.0
66.0
First
Reading
7447.5
7510.5
Last
Reading
10393
10393
GR MWD100 API 26.7_ 113.05 75.4329 5781 -7447.5 10337.5
RPX MWD100 OHMM 0.16 1753.15 9.2712 5766 7462 10344.5
RPS MWD100 OHMM 0.16 1535.98 11.0479 5766 7462 10344.5
RPM MWD100 OHMM 0.12 2000 16.8503 5766 7462 10344.5
RPD MWD100 OHMM 0.04 2000 21.7145 5766 7462 10344.5
FET MWD100 HOUR 0.2 4656.99 42.1962 5766 7462 10344.5
First Reading For Entire File......... .7447.5
Last Reading For Entire File.......... .10393
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/30
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name....... . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/03/30
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name........... . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/03/30
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
Sperry-Sun Dr~ing Services
LIS Scan Utility
e
dâ.3 -/G7
$Revision: 3 $
LisLib $Revision: 4 $
Wed Mar 31 08:52:05 2004
\1r»
Reel Header
Service name............ .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 04/03/3 1
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date.................... .04/03/31
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Milne Point
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-Ol L2
500292314161
B. P. Exploration (Alaska) Inc
Sperry-Sun Drilling Services
30-MAR-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
MW0002714264
J. STRAHAN
D. FERGUSON
MWD RUN 9
MW0002714264
C.A. DEMOSKI
C. DIXON
MWD RUN 10
MW0002714264
C.A. DEMOSKI
C. DIXON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 11
MW0002714264
C.A. DEMOSKI
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
7
12N
lIE
3375
4714
71.90
38.30
#
WELL CASING RECORD
OPEN HOLE
CASING
DRILLERS
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
BIT ~ (IN) SIZE (IN) DEPTH (FT)
6.125 7.625 7487.0
e
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MPS-01 L2 IS AN OPEN-HOLE SIDETRACK WITHIN THE RUN
10 INTERVAL OF
MPS-01 L2 PB1, EXITING AT 9968'MD/4252'TVD.
4. MWD RUNS 9 - 11 COMPRISED DIRECTIONAL WITH DUAL
GAMMA RAY (DGR)
UTILIZING GEIGER-MUELLER TUBE DETECTORS;
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4); AT-BIT INCLINATION
(ABI); AND PRESSURE
WHILE DRILLING (PWD). AS MWD RUN 9 WAS TO POSITION
THE WHIPSTOCK (AND
THE EWR SENSORS DID NOT EXIT THE CASING), ONLY SROP
AND SGRC DATA ARE
PRESENTED FOR THIS RUN. RUN 4 SGRC DATA ARE INCLUDED
FOR CORRELATION
PURPOSES.
5. LOG AND DIGITAL DATA (LDWG) ONLY WERE BLOCK-SHIFTED
1.5' DOWNHOLE,
PER E-MAIL FROM K. COONEY (SIS/BP) DATED 16 MARCH
2004. LOG HEADER
DATA RETAIN ORIGINAL DEPTH REFERENCES.
6. MWD RUNS 4 (PART), 9 - 11 REPRESENT WELL MPS-01 L2
PB1 WITH API#:
50-029-23141-61. THIS WELL REACHED A TOTAL DEPTH
(TD) OF 11075'MD/
4243'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
1
e
e
and clipped curves¡ all bit runs merged.
.5000
START DEPTH
7301.5
7463.5
7463.5
7463.5
7463.5
7463.5
7489.0
STOP DEPTH
11021.0
11028.0
11028.0
11028.0
11028.0
11028.0
11076.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
7301.5
11076.5
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
#
REMARKS:
GR
7300.0
11075.0
BIT RUN NO
4
9
10
11
MERGED MAIN PASS.
$
MERGE TOP
7300.0
7425.0
7447.5
9968.5
MERGE BASE
7424.5
7510.0
9968.0
11075.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction... ............. . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7301.5 11076.5 9189 7551 7301.5 11076.5
ROP MWD FT/H 0.5 464.37 162.711 7176 7489 11076.5
GR MWD API 26.77 119.54 73.4457 7440 7301.5 11021
RPX MWD OHMM 0.16 1753.15 9.57064 7130 7463.5 11028
RPS MWD OHMM 0.16 1535.98 11.1998 7130 7463.5 11028
RPM MWD OHMM 0.12 2000 15.9334 7130 7463.5 11028
RPD MWD OHMM 0.04 2000 19.8907 7130 7463.5 11028
FET
MWD
HOUR
0.1_
4656.99
34.2048
7130
-7463.5
11028
First Reading For Entire File......... .7301.5
Last Reading For Entire File.......... .11076.5
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type........... . . . . .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
2
header data for each bit run in separate files.
4
.5000
START DEPTH
7300.0
STOP DEPTH
7424.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
05-APR-03
Insite
66.37
Memory
7487.0
7300.0
7487.0
58.1
84.8
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
TOOL NUMBER
126027
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
9.875
3140.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
LSND
9.55
e
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
57.0
10.5
1200
5.6
4.100
2.930
4.700
3.000
Name Service Order
DEPT
GR MWD040
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
API 4 1 68 4 2
Name Service Unit
DEPT FT
GR MWD040 API
Min
7300
37.66
Max
7424.5
97.83
First Reading For Entire File......... .7300
Last Reading For Entire File.......... .7424.5
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
Mean
7362.25
69.8168
Nsam
250
250
e
64.0
92.4
68.0
68.0
First
Reading
7300
7300
Last
Reading
7424.5
7424.5
File Type.......... . . . . .~
Previous File Name..... ..STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
e
header data for each bit run in separate files.
9
.5000
START DEPTH
7425.0
7487.5
STOP DEPTH
7447.0
7510.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB!G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
15-0CT-03
Insite
66.37
Memory
7510.0
7487.0
7510.0
.0
.0
TOOL NUMBER
184054
6.125
3140.0
FLO-PRO
9.50
55.0
9.5
65000
4.4
.000
.000
.000
.000
.0
71.2
.0
.0
e
Optical log depth units.4IÞ....... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name
DEPT
ROP
GR
Service Order
Nsam
1
1
1
Units
FT
FT/H
API
Size
4
4
4
MWD090
MWD090
Rep
68
68
68
Code
Channel
1
2
3
Offset
o
4
8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7425 7510 7467.5 171 7425 7510
ROP MWD090 FT/H 1 52.92 19.0172 46 7487.5 7510
GR MWD090 API 36.35 51.72 44.4553 45 7425 7447
First Reading For Entire File......... .7425
Last Reading For Entire File.......... .7510
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
4
header data for each bit run in separate files.
10
.5000
START DEPTH
7447.5
7462.0
7462.0
7462.0
7462.0
7462.0
7510.5
#
LOG HEADER DATA
STOP DEPTH
9968.0
9968.0
9968.0
9968.0
9968.0
9968.0
9968.0
e
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
18-0CT-03
e
Insite
66.37
Memory
9968.0
7510.0
9968.0
59.7
96.3
TOOL NUMBER
184054
159436
13.500
7499.0
FLO PRO
9.50
55.0
7.5
80000
3.8
.280
.200
.540
.260
66.0
93.5
66.0
66.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD100 FT/H 4 1 68 4 2
GR MWD100 API 4 1 68 8 3
RPX MWD100 OHMM 4 1 68 12 4
RPS MWD100 OHMM 4 1 68 16 5
RPM MWD100 OHMM 4 1 68 20 6
RPD MWD100 OHMM 4 1 68 24 7
FET MWD100 HOUR 4 1 68 28 8
e e
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7447.5 9968 8707.75 5042 7447.5 9968
ROP MWD100 FT/H 0.5 464.37 147.196 4916 7510.5 9968
GR MWD100 API 26.77 106.61 74.3808 5042 7447.5 9968
RPX MWD100 OHMM 0.16 1753.15 9.62749 5013 7462 9968
RPS MWD100 OHMM 0.16 1535.98 11.4223 5013 7462 9968
RPM MWD100 OHMM 0.12 2000 17.8253 5013 7462 9968
RPD MWD100 OHMM 0.04 2000 23.3758 5013 7462 9968
FET MWD100 HOUR 0.2 4656.99 48.4446 5013 7462 9968
First Reading For Entire File......... .7447.5
Last Reading For Entire File.......... .9968
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type........ . . . . . . . .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type.......... . . . . . .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
GR
ROP
FET
$
5
header data for each bit run in separate files.
11
.5000
START DEPTH
9968.5
9968.5
9968.5
9968.5
9968.5
9968.5
9968.5
STOP DEPTH
11026.5
11026.5
11026.5
11026.5
11019.5
11075.0
11026.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
18-0CT-03
Insite
66.37
Memory
11075.0
9968.0
BOTTOM LOG INTERVAL (FT)~
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value..................... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
11075.0
87.2
91. 7
TOOL NUMBER
184054
159436
13.500
7499.0
FLO PRO
9.50
51. 0
8.5
65000
5.2
.220
.160
.240
.200
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD110 FT/H 4 1 68 4 2
GR MWD 11 0 API 4 1 68 8 3
RPX MWD 11 0 OHMM 4 1 68 12 4
RPS MWD110 OHMM 4 1 68 16 5
RPM MWD110 OHMM 4 1 68 20 6
RPD MWD 11 0 OHMM 4 1 68 24 7
FET MWD 11 0 HOUR 4 1 68 28 8
Name Service unit
DEPT FT
ROP MWD110 FT/H
Min
9968.5
4.93
Max
11075
340.37
Mean
10521.8
200.145
Nsam
2214
2214
e
65.0
93.5
65.0
65.0
First
Reading
9968.5
9968.5
Last
Reading
11075
11075
GR MWD 11 0 API 41.9_ 119.54 72.2556 2103 -9968.5 11019.5
RPX MWD 11 0 OHMM 3.11 613.88 9.43601 2117 9968.5 11026.5
RPS MWD 11 0 OHMM 4.14 44.74 10.6728 2117 9968.5 11026.5
RPM MWD110 OHMM 5.26 41.09 11.4534 2117 9968.5 11026.5
RPD MWD110 OHMM 6.23 29.84 11.6381 2117 9968.5 11026.5
FET MWD110 HOUR 0.18 1. 61 0.485295 2117 9968.5 11026.5
First Reading For Entire File......... .9968.5
Last Reading For Entire File.......... .11075
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/03/31
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.006
Physical EOF
Tape Trailer
Service name............ .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 04/03/31
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name....... . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/03/31
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name..... . . . . . .UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File