Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-169 .. - Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. d.. a '3 - -l be¡ Well History File Identifier D Two-sided 1111111111111111111 Organizing (done) D Rescan Needed 11111111I1111111111 Rji'CAN ~ Color Items: D Greyscale Items: DIGITAL DATA OVERSIZED (Scannable) D Maps: D Other Items Scannable by a Large Scanner D Diskettes, No. D Other, NolType: D Poor Quality Originals: OVERSIZED (Non-Scannable) D Other: D Logs of various kinds: NOTES: Date J :J-¡I,+/OÇ D Other:: BY: G;J Isl mf 1111111111111111111 "V\I\f Project Proofing BY: r ~aria ~ Date ~~¡ I Lf loS '3 X 30 = ClO + r7 = TOTAL PAGES 01 . . I. II / (Count does not include cover s~le IIlA P Date: I d-. J 4- ()~Ç Isl r f t 1111111111111111111 Isl BY: ~ Scanning Preparation Production Scanning Stage 1 Page Count from Scanned File: q ~ (Count does include cover sheet) Page Count Matches Number in Scannin¡¡ pre~aration: v---- YES BY: ~ Date: J e--l J if lOb Stage 1 If NO in stage 1, page(s) discrepancies were found: Isl NO vvtP YES NO BY: Maria Date: Isl 1111111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned 1111111111111111111 BY: Maria Date: Isl Comments about this file: Quality Checked 1111111111111111111 10/6/2005 Well History File Cover Page.doc • • ,.--~ -°=~ -- MICROFILMED 03101/2008 DO NOT PLACE ~~~... ANY NEW MATERIAL UNDER THIS PAGE F:1LaserFiche\C~rPgs_Inserts~Microfilm_Marker. doc ."lRECEIVED ~1 ,,_. .... STATE OF ALASKA .. ;-1 ¡- EB ,0 j\~KA OIL AND GAS CONSERVATION COM.SION Alaska Oil & ~b~ON OR RECOMPLETION REPORT AN~ .LOG RevIsion" Status Change to Abandoned Anr.horaae 1 a. Well Status: DOil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class: 20MC 25.105 20MC25.110 181 Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions One Other D Stratigraphic D Service 2. Operator Name: 5. Date Comp., Susp., or A~il~ 12. Permit to Drill Number BP Exploration (Alaska) Inc. 11/2/2005 203-169 - 305-344 r 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 10/16/2003 50- 029-23141-61-00 ' 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 10/18/2003 MPS-01 L2 - 3375' NSL, 4714' WEL, SEC. 07, T12N, R11 E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 1420' NSL, 239' WEL, SEC. 06, T12N, R11 E, UM KBE = 71.90' Milne Point Unit I Schrader Bluff - Total Depth: 9. Plug Back Depth (MD+ TVD) 4509' NSL, 767' WEL, SEC. 06, T12N, R11E, UM 7200 + 4072 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 566077 y- 6000045 Zone- ASP4 11075 + 4243 Ft ADL380110 TPI: x- 570509 y- 6003410 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 569940 y- 6006494 Zone- ASP4 N/A MD DYes 181 No 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey N/A MSL 1800' (Approx.) 21. Logs Run: MWD , GR , RES, ABI , PWD , IFR/CASANDRA 22. CASING, LINER AND CEMENTING ReCORD ··.··.·iCÀSIN(';; $ET11NG DEPTH MD SeTTING DEPTH WD HOLE J >. .......>. :.... ... . SIZE Wr. PER F-r.. GrooE Top BOTTOM Top BdrroM SiZE·.·. ,.; '\i ... 1·.·Pti2L~b .... 20" 92# H-40 34' 112' 34' 112' 42" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# L-80 35' 3140' 35' 2375' 13-112" 946 sx PF 'L' 275 sx Class 'G' 7-5/8" 29.7# L-80 33' 74R7' 33' 4222' 9-718" 160 sx PF 'E' 293 sx Class 'G' 4-112" 12.6# L-80 7482' 11045' 4219' 4243' 6-1/8" Uncemented Slotted Liner 23. Perforations open to Production (MD + TVD of Top and 124. ..... ........ ..' ···L.>;·<> ....\>.. ..... >\ \ ... Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None None MD TVD MD TVD 25. A ",-. ". ..... ." ·;.i< ..ii;/"·;'..»< SCANNED MAR 2 .2 2007 "V'Uf' . >'; DePTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Set Cement Retainer with 25 Bbls Class 'G", Squeezed 20 Bbls 'G' below and 5 Bbls 'G' on top Freeze Protected with 111 Bbls of Diesel. 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED OIL -BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR) Press. 24-HoUR RATE'" 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheaLif nece.~ Submit core chips; if none, state "none". -=¡o'_. \ None R8DMS SFt MAR ,2 2 2DD" ~~.J12~_ [ I '. ~:~~ --.....-- i Form 10-407 Revised 12/2003 ·R:..'....... I C.".'.. N· '1 tNTINUED ON ReVERSE SIDE ,qV I A k,(~ .~)? ~·I' .Þ') ;¿:-'~þ( <S 28. GEOLOGIC MARKER NAME MD TVD TUZC MA MB1 MB2 MB2-1 MC SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE 6344' 6906' 6955' 7061' 7217' 7298' 7358' 7362' 7403' 7408' 7423' 7448' 7458' 7470' 7488' 3694' 3924' 3948' 4000' 4080' 4123' 4155' 4157' 4179' 4181' 4189' 4202' 4207' 4213' 4223' 30. List of Attachments: Wellbore Schematic 29. RMA TION TESTS Include and briefly mmarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". None Signed Sondr 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Date Title Technical Assistant MPS-01 L2 Well Number 203-169 305-344 Permit No. I A roval No. Prepared By NameINumber: Drilling Engineer: Sondra Stewman, 564-4750 Adrienne McVey, 564-4184 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval), ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None", ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only ~ 4-1/16"-5M FMC . Wellhead' 11" x 4.5" 5M Ge wI 4.5" TCII T&B Tubing Hanger 4" CIW "H" BPV profile 20" x 34" insulated, 215 #/ft A-53 ~ Orig. KB elev. = 72.50' (Doyon 14) or.. elev.= 38.30' (Doyon 14) MPS-01 103/4" 45.5 ppf L-80 BTRC (Drift ID = 9.794, cap, = .0961 bpf) 103/4" Super Seal II Float Shoe I 3140' I 7 5/8" 29.7 ppf, L-80, BTRC-mod production casing (drift ID = 6.750", cap. = 0.0459 bpf) Kill string @ 3,650' 4,5", 12,6#, L-80 IBT tbg, (cap, = .0152 bpf, id =3.958) KOP @ 400' 53+ degree from 1950' Max hole angle = 68 degree @ 5060' 58 degree @ Sleeve 11II( Top of Cement @ 7091' Cement retainer set @ 7200' ( 5 bbls of cement on top) Window in 7-5/8" Casing @ 7487' - 7 Well Angle @ window = 60° Baker Hook Wall Hanger inside 7-5/8" Window 7482' Baker Hook Wall Hanger outside 7-5/8" Window 7499' Baker Tie Back Sleeve 7662' Baker Hook Wall Hanger inside 7-5/8" Window 7671' Baker Hook Wall Hanger outside 7-5/8" Window 7697' HES 3.5" XN-Nipple (2.750" No-Go) 5-1/2" Mule shoe I 7,595' I 542' 7,5 ' 7,556' 7,578' Window in 75/8" Casing @ 7685' - 7697' Well Angle @ window = 73° OA Lateral 66 jts. - 4 1/2" R3 Slotted Liner 12,6# L-80 IBT (7,747'-10,199') Rat Hole 287' 7-5/8" Halliburton Float Collar 8054' 7-5/8" Halliburton Float Shoe 8139' 61/8" Hole td @ 10,530'/ Btm Baker41/2" Guide Shoe 10,243' Baker Tie Back Sleeve 7885' Baker ZXP Liner Top Packer 7,892' Baker 7-5/8" x 5" HMC Liner Hanger 7,898' 61/8" Hole td @ 10,515' / Btm Baker41/2""V" Float Shoe 10,514' 60 jts. - 4 1/2", 12.6# L-80, IBT OB Lower Lateral Slotted Liner (8,117'-10,512') DATE 04/16/03 10/21/03 713/06 REV. BY MDO MOO KDC COMMENTS Drilled & Completed Doyon 14 NE Lateral & Completed Doyon 14 ADD CEMENT ABOVE RETAINER MILNE POINT UNIT WELL 8-01 API NO: 50-029-23141-60 L2 API NO: 50-029-23141-60 L 1 API NO: 50-029-23141-00 BP EXPLORATION (AK) . Page 1 of 2 . Stewman, Sandra D From: McVey, Adrienne Sent: Tuesday, January 02,200710:12 AM To: Stewman, Sondra D Subject: FW: Sundry approval requirements for MPS-01A Sondra, Here's the final word from Tom Maunder on the S-01A permitting requirements. When you have a moment, could you let me know what information we need for the 407's? I've never had to submit one before. -Adrienne From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us] Sent: Wednesday, December 27,20067:39 AM To: McVey, Adrienne Cc: Steve Davies; Steve McMains; Dave Roby Subject: Re: Sundry approval requirements for MPS-OIA Adrienne, We agree with what you propose. Submit 407's for the abandonment of the laterals and a sundry to re- enter the mainbore and prepare it for sidetrack. Call or message with any questions. Tom Maunder, PE AOGCC Thomas Maunder wrote, On 12/22/20067:56 AM: Adrienne, Good questions. I will check with my colleagues over here. I tend to agree with considering the laterals abandoned and filing one sundry to re-enter. I will get back to you. Tom Maunder, PE AOGCC McVey, Adrienne wrote, On 12/22/20067:44 AM: Tom, I'm the engineer for an upcoming Milne Point sidetrack, S-01 A, currently set to spud on January 24. I have a question regarding the required sundry approval(s). The original well, S-01, was a tri-Iateral. We attempted a rig workover on the well last October, which went very badly, and we ended up suspending the well; the lower two laterals are isolated by a packer assembly with a plug in the tailpipe, and we isolated the upper lateral by setting an EZSV retainer in the main wellbore and pumping cement below and above. We filed a separate sundry for each lateral (305-342, 305-343, and 305- 344), but the Type of Request for all 3 was marked as Suspend. It seems to me that the sundry for the main wellbore (305-342) should have indicated we'd suspended the well, and the other 2 should have been classified as abandonments. So, my question is: for re-entering the main wellbore and doing a cut-and pull sidetrack below the surface shoe (which will not affect the isolation below), what sundry approvals do we 1/3/2007 . Page 2 of 2 . need? Do we need just one for re-entering a suspended well, or do we also have to file sundries to switch the status of the upper two laterals from suspended to abandoned? Please Jet me know if you have questions. Thanks! Adrienne McVey BP ACT Drilling 907-564-4184 (office) 907-748-9865 (cell) mcv~_ªl@ bp.cQITl 1/3/2007 .~_. ~_.'''''''~./ -t"'t""'-' ._~ '''''''1'''''''''' ""'..........I.-J ......" "..... >.J \Jl<'" Adrienne, We agree with what you propose. Submit 407's for the abandonment of the laterals and a sundry to re-enter the main bore and prepare it for sidetrack. Call or message with any questions. Tom Maunder, PE AOGCC Thomas Maunder wrote, On 12/22/20067:56 AM: ~06 - (0lf Adrienne, Good questions. I will check with my colleagues over here. I tend to agree with considering the laterals abandoned and filing one sundry to re-enter. I will get back to you. Tom Maunder, PE AOGCC McVey, Adrienne wrote, On 12/22/20067:44 AivI: ~: !~' Tom, I'm the engineer for an upcoming Milne Point sidetrack, S-01A, currently set to spud on January 24. I have a question regarding the required sundry approval(s). The original well, S-01, was a tri-Iateral. We attempted a rig workover on the well last October, which went very badly, and we ended up suspending the well; the lower two laterals are isolated by a packer assembly with a plug in the tailpipe, and we isolated the upper lateral by setting an EZSV retainer in the main wellbore and pumping cement below and above. We filed a separate sundry for each lateral (305-342, 305-343, and 305-344), but the Type of Request for all 3 was marked as Suspend. It seems to me that the sundry for the main wellbore (305-342) should have indicated we'd suspended the well, and the other 2 should have been classified as abandonments. So, my question is: for re-entering the main wellbore and doing a cut-and pull sidetrack below the surface shoe (which will not affect the isolation below), what sundry approvals do we need? Do we need just one for re-entering a suspended well, or do we also have to file sundries to switch the status of the upper two laterals from suspended to abandoned? Please let me know if you have questions. Thanks! Adrienne McVey BP ACT Drilling 907-564-4184 (office) 907-748-9865 (cell) mcvea Î @bp.com of I [2/27/2006 10:04 AM WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Ceresa Tolley 333 West 7th Avenue, Suite 100 Anchorage, Alaska 9950 I December 03, 2003 13&/~ I oCr /1 RE: MWD Formation Evaluation Logs: MPS-OI Ll+L2+L2 PBl, AK-MW-2355592 MPS-Ol Ll+L2+L2 PBl:r{)O ?.:rO .?/5 Digital Log Images: -:¡J03-1 LJ1 50-029-23141-60,61, 71 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB33 900 E. Benson Blvd. Anchorage, Alaska 99508 Date::) ! [) g/ Nr Signed~lçf;íCfDc ( .~ ,~ . ~ (j ) j/ ;;v (\fitV' ^~ ~ \- DATA SUBMITTAL COMPLIANCE REPORT 11/8/2005 5 -ulJ..- t~òct~, API NO~O-029-23141-61-00 Permit to Drill 2031690 Well Name/No. MILNE PT UNIT SB S-01L2 Operator BP EXPLORATION (ALASKA) INC MD 11075"'- TVD 4243 ,,- Completion Date 10/21/2003/ Completion Status 1-01L Current Status 1-01L UIC N Mud Log No r~ Directio~urvey _ Yes (data taken from Logs Portion of Master Well Data Maint Interval OH/ . Start Stop CH Received Comments 7301 11021 Open 4/16/2004 EWR4 GR ASI ROP PWD 9936 11075 12/8/2003 9936 11075 12/8/2003 MWD 7421 10393 12/8/2003 PS1 7421 10393 12/8/2003 PS1 - MWD 0 0 4/16/2004 DSN 12553 9968 10339 Open 4/16/2004 PS1 EWR4 GR ASI ROP PWD 0 0 4/16/2004 DSN 12554 REQUIRED INFORMATION Samples No DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, ASI, PWD, IFRlCASANDRA Well Log Information: Log/ Data Digital Type..,..--Med/Frmt œ6 D Lis ~ ~t j1tPt £P6t ~ Lis ~ Electr Dataset Number Name 12553 Induction/Resistivity Directional Survey Directional Survey Directional Survey Directional Survey LIS Verification 12554 Induction/Resistivity Log Log Scale Media Run No Well Cores/Samples Information: LIS Verification Name Interval Start Stop Sample Set Number Comments . Sent Received ADDITIONAL INFORMATION Well Cored? Y ~ Chips Received? -y! tJ Analysis Received? Comments: Daily History Received? ~: Formation Tops ~ Permit to Drill 2031690 MD 11075 TVD 4243 Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 11/8/2005 Well Name/No. MILNE PT UNIT 5B S-01L2 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23141-61-00 ~etion Date Completion Status 10/21/2003 1-01L Current Status 1-01L UIC N , '1 ~. "'\ L \r Date: .? ~.J . . KI::LJtlVt:D DEe 0 5 2005 I STATE OF ALASKA . ALASKA AND GAS CONSERVATION COMM ON WELL COMPLETION OR RECOMPLETION REPORT AND uAlllk, Oíl &. GIS Cons. Commission Anchorage 1a. Well Status: 0 Oil 0 Gas 0 Plugged 0 Abandoned II Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD , GR , RES, ABI , PWD , IFR/CASANDRA CASING, liNER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTfITVO HOLE lOP BoTTOM lOP BoiTOM SIZE 34' 112' 34' 112' 42" 35' 3140' 35' 2375' 13-1/2" 33' 7487' 33' 4222' 9-7/8" 7482' 11045' 4219' 4243' 6-1/8" o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3375' NSL: 4714' WEL, SEC. 07, T12N, R11E, UM / Top of Productive Horizon: 1420' NSL, 239' WEL, SEC. 06, T12N, R11E, UM Total Depth: 4509' NSL, 767' WEL, SEC. 06, T12N, R11 E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 566077 y- 6000045 Zone- ASP4 TPI: x- 570509 y- 6003410 Zone- ASP4 Total Depth: x- 569940 y- 6006494 Zone- ASP4 ---~_.~-------------- --------------------- ---------------- 18. Directional Survey 0 Yes II No 22. CASING SIZE 20" 10-314" 7-5/8" 4-1/2" Wr. PER Fr. 92# 45.5# 29.7# 12.6# GRADE H-40 L-80 L-80 L-80 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD MD 25. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Set Cement Retainer with 25 Bbls Class 'G", Squeezed 20 Bbls 'G' below and 5 Bbls 'G' on top Freeze Protected with 111 Bbls of Diesel. One Other 5. Date Comp., Susp., or Aband. 11/2/2005 6. Date Spudded 1 0/16/2003 7. Date T.D. Reached 10/18/2003 8. KB Elevation (ft): KBE == 71.90' 9. Plug Back Depth (MD+ TVD) 7200 + 4072 10. Total Depth (MD+TVD) 11075 + 4243 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/ A MSL 24. SIZE None TVD 1b. Well Class: II Development 0 Exploratory o Stratigraphic 0 Service 12. Permit to Drill Number 203-169 / 305-344 13. API Number 50-029-23141-61-00 .; 14. Well Name and Number: MPS-01L2 . 15. Field I Pool(s): Milne Point Unit / Schrader Bluff Ft Ft 16. Property Designation: ADL 380110 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) AMOUNT PULLED 260 sx Arctic Set (Approx.) 946 sx PF 'L', 275 sx Class 'G' 160 sx PF 'E', 293 sx Class 'G' Uncemented Slotted Liner DEPTH SET (MD) PACKER SET (MD) 26. Date First Production: Not on Production ' Date of Test Hours Tested PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-Bsl GAs-McF WATER-BsL OIL-Bsl None ' GAs-McF WATER-Bsl CHOKE SIZE I GAS-OIL RATIO OIL GRAVITy-API (CORR) RBDMS BFL DEC () 9 2D05 Form 10-407 Revised 12/2003,0 RIG I f~ A~UED ON REVERSE SIDE 28. ... GEOLOGIC MARKERS .-. 29. 4RMATION TESTS Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". NAME MD TVD TUZC MA MB1 MB2 MB2-1 MC SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE 6344' 6906' 6955' 7061' 7217' 7298' 7358' 7362' 7403' 7408' 7423' 7448' 7458' 7470' 7488' 3694' 3924' 3948' 4000' 4080' 4123' 4155' 4157' 4179' 4181' 4189' 4202' 4207' 4213' 4223' None 30. List of Attachments: Summary of Daily Drilling Reports and a Wellbore Schematic 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Technical Assistant Date lZ:.~CB-c;S MPS-01 L2 Well Number 203-169 305-344 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By NamelNumber: Drilling Engineer: Sondra Stewman, 564-4750 John Rose, 564-5271 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only . . BP EXPLORATION Operations Summary Report Page 10t. 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 0/ WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 1 0/15/2005 10/21/2003 14 Spud Date: 3/25/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 10/20/2005 17:00 - 19:00 2.00 MOB P PRE Skid rig floor 19:00 - 20:00 1.00 MOB P PRE Move off MPS-10 20:00 - 22:00 2.00 MOB P PRE Work on rig moving system 22:00 - 23:00 1.00 MOB P PRE Move rig on MPS-1 23:00 - 00:00 1.00 MOB P PRE Skid rig floor and rig up 10/21/2005 00:00 - 04:00 4.00 RIGU P PRE Take on sea water, Rig up to 350 bbl waste circ tank. test lines to tank, and kill lines, pull BPV, rig Accept @ 0001 10/21/2005 04:00 - 04:30 0.50 RIGU P PRE Pre-spud meeting with crew 04:30 - 07:00 2.50 PULL P DECOMP Circ out with sea water and safe surf-o pills, thru tubing, taking returns up annulus thru choke to waste tank, 3 bbls min. 400 psi, 150 on annulus, starting pressure on tubing 200 psi, annulus 200 psi, bleed right off just gas. 07:00 - 08:00 1.00 RIGU P PRE Install TWC and test to 4500 psi, good test 08:00 - 09:00 1.00 RIGU P PRE Nipple down tree 09:00 - 11 :00 2.00 RIGU P PRE Nipple up BOPS 11 :00 - 16:30 5.50 RIGU P PRE Test BOPS and manifold to 250-3000 psi for 5 min. per test, hydril 250-2500 psi 5 min. per test, the right to witness test was wavier by John Crisp AOGCC, test was witness by WSL., Choke line valve failed 16:30 - 19:30 3.00 RIGU N SFAL PRE PJSM, Replace Choke line HCR valve 19:30 - 20:00 0.50 RIGU P PRE Finish BOP test, Tested HCR valve 250-3000 psi 5 min per test 20:00 - 21 :00 1.00 RIGU P PRE lay down test equipment, rig up stack tongs, pup 3 ft pup on Lubricator 21 :00 - 22:00 1.00 RIGU P PRE Pull TWC with lubricator 22:00 - 22:30 0.50 PULL P DECOMP Make up landing jt. pull hanger to floor, P/U wt 105K 22:30 - 23:30 1.00 PULL P DECOMP PJSM, Rig up floor to lay down Tubing, spooling unit, lay down hanger 23:30 - 00:00 0.50 PULL P DECOMP Laying down 12.6# L-80 IBT Tubing 10/22/2005 00:00 - 08:00 8.00 PULL P DECOMP Laying down 12.6# L-80 IBT Tubing, total 173 jts, 1 GLM, Phoenix pressure gauge, Sliding sleeve, jet pump and 3.5 cut jt. (tubing cut @ 7230.12) 08:00 - 08:30 0.50 PULL P DECOMP Clear floor, lay down spooling unit 08:30 - 09:30 1.00 PULL P DECOKAP install test plug, test lower rams 250-3000 psi 5 min. per test, John Crisp wavier the right to witness test, test witness by WSL 09:30 - 11 :30 2.00 PULL P DECOMP Picking up Milling assem, #1,63/4 mill shoe,2 mill extension,boot basket,2 junk subs,bit sub,bumper sub,jars,shear out sub,9-dc,6 hw 11 :30 - 15:00 3.50 PULL P DECOMP Picking up 4" drill pipe out of shed 15:00 - 16:00 1.00 PULL P DECOMP Running drill pipe out of derrick 16:00 - 20:00 4.00 PULL P DECOMP Milling over packer @ 7242', with 127K P/U, 95K SIO, 105K RT, 70 rpms, 400 gpm, 1080 psi, mill 6" mill not acting right, 20:00 - 22:00 2.00 PULL P DECOMP POHto check mill assm. 22:00 - 23:00 1.00 PULL P DECOMP Stand back BHA, found 2.5" wide and 6" long and a .75 wide 6" long pieces in junk sub and lots of mill marks on outside of mill assm. one piece has part or order # on it 10050741, check clamps that was on tubing (don't match and we had the right count coming out of hole), call Baker shop and they don't have any thing with this # on it. we have something in hole with us above packer, (Clamp, something off phoenix gauge, or sliding sleeve ????) 23:00 - 00:00 1.00 PULL P DECOMP Picking up BHA #2, same as #1 but with 3 more DC 10/23/2005 00:00 - 00:30 0.50 PULL P DECOMP Picking up BHA #2 Printed: 111712005 9:57:36 AM - '--/ BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 10/15/2005 10/21/2003 14 Spud Date: 3/25/2003 End: Date From- To Hours Task Code NPT Phase Description of Operations 10/23/2005 00:30 - 02:00 1.50 PULL P DECOMP Rih to 7050' 02:00 - 03:30 1.50 PULL P DECOMP Slip and cut drilling line, service topdrive 03:30 . 04:00 0.50 PULL P DECOMP Rih to top of packer, pushing something from 7220' to 7242'. with 5-6K 04:00 - 05:00 1.00 PULL P DECOMP Mill over packer @ 7242 to 7244 with 75 rpms, 350 gpm, 900 psi, packer tum loose and started down hole. 05:00 - 07:00 2.00 PULL P DECOMP Push packer to 7324' , Circ bottoms up 07:00 - 10:30 3.50 PULL P DECOMP POH to BHA 10:30 - 11 :30 1.00 PULL P DECOMP Stand back BHA, lay down Bum shoe Assem. 11 :30 - 13:30 2.00 PULL P DECOMP Picking up BHA #3 overshot 13:30 - 15:30 2.00 PULL P DECOMP Rih to 7324' 15:30 - 16:00 0.50 PULL P DECOMP Tag packer push to 7458', Latch on to packer. 16:00·17:00 1.00 PULL P DECOMP Shear out circ. sub, with 2840 psi,círc bottoms up, with 500 gpm, 2840 psi, flow check well 17:00 - 22:00 5.00 PULL P DECOMP POOH with packer to BHA 22:00 - 00:00 2.00 PULL P DECOMP Stand back BHA,lay down fishing assm.lay down packer and tail pipe assm., left slips and setting cones and packer rubbers in hole. 10/24/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP Pickup stack washer wash out stack 01 :00 - 03:00 2.00 PULL N DFAL DECOMP PJSM, picking up BHA #4 03:00 - 05:00 2.00 PULL N DFAL DECOMP Rih with reverse circ sub to 7400' 05:00 - 06:00 1.00 PULL N DFAL DECOMP Wash 7400 to 7482 set down on top of hook wall hanger, pick up and tum pipe 1/2 tum, went by top of hook wall hanger to 7489' set down, top of window in key slot @ 7487' to 7499', work pipe trying to work junk in window 06:00 - 10:00 4.00 PULL N DFAL DECOMP Mill on junk 7489' to 7493 with 40-50 rpms, 1-2K wt. 350 gpm 1650 psi, lost 600 psi pump pressure 10:00 - 12:30 2.50 PULL N DFAL DECOMP Flow check well,POH to BHA 12:30 - 14:30 2.00 PULL N DFAL DECOMP Stand back hwdp,collars, lay down 2 7/8 pipe jars, bumper sUb,(Jeft reverse circ sub in hole, 5.69 ft.) 14:30 - 15:30 1.00 PULL N DFAL DECOMP Wait on fishing tools 15:30 - 16:30 1.00 PULL N DFAL DECOMP Pickup BHA # 5, overshot,bumper sub, oil jars,circ sub,12 dC,6 hwdp 16:30 - 18:30 2.00 PULL N DFAL DECOMP Rih to 7488, wash last stand to bottom, 200 9pm, 490 psi 18:30 - 19:00 0.50 PULL N DFAL DECOMP Engage fish push to 7493, Plu 144K, Slo 90k, RIt 112k, tq 5k 19:00 - 21 :30 2.50 PULL N DFAL DECOMP POH to BHA 21 :30 - 23:00 1.50 PULL N DFAL DECOMP Stand back BHA back, lay down fish, found no metal in reverse circ. sub, fingers in side was broke off,reverse circ sub was bent starting about 2 ft up from mill 23:00 - 00:00 1.00 PULL N DFAL DECOMP Slip and cut drillline,service topdrive 10/25/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Finsh Cutting Drilling line 00:30 - 01 :30 1.00 PULL N DFAL DECOMP Picking up BHA #6, 4 5/8 mill,boot basket,boot basket,bit sub,bumper sub,oil jar,string magnet,xo sub, 12 dC,6 hwdp 01 :30 - 03:30 2.00 PULL N DFAL DECOMP Rih to 7409 03:30 - 05:00 1.50 PULL N DFAL DECOMP washed from 7409 to 7491, Mill on junk 7491 45 rpms, 500 gpm, 1500 psi, making no head way, acts like the mill is in bind, not milling on junk, quit rotating and put 25 k on mill started sliding went to 7498, picked up to 7480 pull15k over to pull mill thru, done this about 5 times making no head way, pull mill to depth of window of mother bore 7488-7489 let pipe rotate slow and pump 600 gpm 2000 psi PIU 144k, S/O 95, RfT 114k 05:00 . 08:30 3.50 PULL N DFAL DECOMP Circulate condition mud - GPM 600 - PP 2000 - PU 137 - SO Printed: 11m2005 9:57:36 AM . . BP EXPLORATION Operations Summary Report Page 3 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 1 0/15/2005 10/21/2003 14 Spud Date: 3/25/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 10/25/2005 05:00 - 08:30 3.50 PULL N DFAL DECOMP 90 - ROT 112 - TO 3.5 08:30 - 11 :00 2.50 PULL N DFAL DECOMP Flow check - POH from 7491' to BHA 11 :00 - 12:00 1.00 PULL N DFAL DECOMP Stand back HWT - DC's - Clean off magnet - Clean junk baskets - LD jar assembly 12:00 - 12:30 0.50 PULL N DFAL DECOMP Lubricate rig 12:30 - 13:30 1.00 PULL N DFAL DECOMP Wait on tools 13:30 - 14:30 1.00 PULL N DFAL DECOMP PJSM - MU BHA - 3 1/2" Mule shoe - 3 joints 3 1/2" DP - Junk baskets - Bumber sub - Jar - Magnet - Collars - HWDP 14:30 - 16:30 2.00 PULL N DFAL DECOMP RIH from 716' to 7482' 16:30 - 21 :00 4.50 PULL N DFAL DECOMP Attempt to work through liner - No success - Rotate string 60 rpm work through liner top - Con't wash down from 7482' to 7531' - GPM 700 - PP 2800 - TO 10 - RPM 60 - PU 170 - SO 80 - ROT 120 - Bottom out on HR profile in upper NE Lateral - Pump 3 - 40 bbl sweeps - GPM 700 - PP 2800 - Lots sand back 1 st sweep - 2nd sweep about half as the first - 3rd sweep no sand back - Hole appears clean 21 :00 - 23:30 2.50 PULL N DFAL DECOMP Flow check - Well static - POH from 7531' to BHA @ 716' 23:30 - 00:00 0.50 PULL N DFAL DECOMP Stand back HWDP - Collars 10/26/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP Con't clean out junk baskets - (No recovered junk) - LD magnet 1- (No Junk recovered off magnet) - Jars assy - Moblize Baker cutter assy to rig floor 01 :00 - 02:00 1.00 PULL N DFAL DECOMP MU cutter assy - MU BHA 02:00 - 03:30 1.50 PULL N DFAL DECOMP RIH from 605' to 7422' 103:30 - 05:00 1.50 PULL N DFAL DECOMP Establish cutting parimeters @ 7422' - RPM 30 TO 5 - PU 155 - SO 93 - ROT 117 - RIH to 7496' Could not pass - Rotate j string down to 7508' - Work string from 7508 to 7512' i 05:00 - 06:00 1.00 PULL N DFAL DECOMP Cut 4 1/2" tubing @ 7510' - GPM 500 - PP 1100 - RPM 45 - TO 8300 - TO dropped to 7300 - Indicated tubing cut 06:00 - 08:30 2.50 PULL N DFAL DECOMP Flow check - Well static - POH from 751 0' to 605' 08:30 - 09:30 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - Left 31/8' cutter assy and 3 7/8' stablizer in hole 09:30 - 11:00 1.50 PULL N DFAL DECOMP Cut off drilling line - Top drive service - Moblize BHA 11:00 - 12:00 1.00 PULL N DFAL DECOMP MU fishing tools - Overshot with grapple - Jar assy - DC's - . HWDP 12:00 - 12:30 0.50 PULL N DFAL DECOMP RIH with pump out sub - Collars - HWDP 12:30 - 14:30 2.00 PULL N DFAL DECOMP RIH from 611' to 7494' 14:30 - 15:00 0.50 PULL N DFAL DECOMP Attempt to engage fish - No success - PU 155 - SO 90 - ROT 112 - TO 6K 15:00 - 18:00 3.00 PULL N DFAL DECOMP POH from 7494' to 611' 18:00 - 18:30 0.50 PULL N DFAL DECOMP Stand back BHA - LD overshot - No fish retrieved 18:30 - 20:00 1.50 PULL N DFAL DECOMP MU spear assy - Jars - Collars - Accelerator jar - HWDP 20:00 - 22:00 2.00 PULL N DFAL DECOMP RIH from 595' to 7482' 22:00 - 22:30 0.50 PULL N DFAL DECOMP Engage hanger @ 7487' - Jared fish 3 times - Jar hanger free with 80K over string weight - PU 155 - SO 90 22:30 - 00:00 1.50 PULL N DFAL DECOMP POH from 7487' to 3750' 10/27/2005 00:00 - 01:00 1.00 PULL N DFAL DECOMP Con't POH with spear assy - from 3750' to 595' 01 :00 - 02:00 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - Recovered 8' fish - Top 8' of hanger assy - (2' of mother bore entry section on bottom of fish) - Appromximately 9' left in Mother bore 02:00 - 03:00 1.00 PULL N DFAL DECOMP LD Baker tools - Accelerator - Spear assy - Clear rig floor of extra tools 03:00 - 07:30 4.50 PULL N DFAL DECOMP Wait on tools from Deadhorse 07:30 - 08:00 0.50 PULL N DFAL DECOMP Moblize BHA to rig floor Printed: 11f712005 9:57:36 AM . . . BP EXPLORATION Operations Summary Report Page40f7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 10/15/2005 10/21/2003 14 Spud Date: 3/25/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 10/27/2005 08:00 - 09:30 1.50 PULL N DFAL DECOMP MU Mills - Stablizers - Jars - DC's - HWDP 09:30 - 11 :30 2.00 PULL N DFAL DECOMP RIH with BHA # 11 - From 700 to 7347' 11 :30 - 12:00 0.50 PULL N DFAL DECOMP Establish drlg parimeters - Tag top of fish@ 7490' - PU 147- SO 90 - ROT 112 - TO 5 - RPM 100 12:00 - 18:00 6.00 PULL N DFAL DECOMP Mill from 7490' to 7522' - RPM 95 - TO 8 - GPM 500 - PP 1790 18:00 - 19:30 1.50 PULL N DFAL DECOMP Pump sweep - CBU 4X - GPM 710 - PP 3240 PP - RPM 90- TO 6K - Lot of fine metal - metal flakes - sand over shakers - Well appeared to clean up after 4 bottoms up - Flow Check- Well static 19:30 - 22:00 2.50 PULL N DFAL DECOMP POH from 7522' to 622' 22:00 - 23:00 1.00 PULL N DFAL DECOMP BHA - LD mill- (Mill 80% worn on face - 1/16' out of gauge)- Lots of fine metal on magnet - No metal was recovered in Junk baskets 23:00 - 00:00 1.00 PULL N DFAL DECOMP MU Reverse circ jet basket - Clean out assy 10/28/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Con't MU Reverse circ jet basket assy - MU DC's - HWDP 00:30 - 02:30 2.00 PULL N DFAL DECOMP RIH with Clean out assy - from 616' to 7422' 02:30 - 03:30 1.00 PULL N DFAL DECOMP Cut drlg line - Top drive I blocks service 03:30 - 05:00 1.50 PULL N DFAL DECOMP Fishing for junk I clean out from - 7522' to 7524' - GPM 500 - PP 3380 - RPM 45 - TO 5.5· PU 153 - SO 85 - ROT 110- 05:00 - 08:30 3.50 PULL N DFAL DECOMP String hung up @ 7524' - Jar / work string free 08:30 - 12:00 3.50 PULL N DFAL DECOMP Flow check - Well static - POH to BHA 12:00 - 13:00 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - LD BHA - Jars - Boot baskets - Magnet - Stablizers - Jet basket 13:00 - 13:30 0.50 PULL N DFAL DECOMP Clear rig floor of tools 13:30 - 15:00 1.50 EVAL N DFAL DECOMP PJSM - Rig up to test BOP's 15:00 - 18:30 3.50 EV AL N DFAL DECOMP Testing BOP's - Annular 250 low 2500 high 5 mins each test- Top / Bottom VBR rams - Choke manifold - Manual Choke / Kill valves - HCR choke I Kill valves - Upper / Lower IBOP - Floor safety valves - Blind rams - 250 low 3000 high 5 mins each test - Performed Accumulator test - Valve #6 failed on choke manifold - All other test were good - Test witnessed by WSL / John Spalding with AOGCC 18:30 - 19:30 1.00 EVAL N DFAL DECOMP Change out paddle and seat on valve #6 - Retested same - Test good 19:30 . 20:30 1.00 EVAL N DFAL DECOMP RD testing equipment - Pull test plug - Install wear ring - Close annulus valves - Blow down choke manifold - Moblize BHA to rig floor 20:30 - 21 :30 1.00 PULL N DFAL DECOMP PJSM - MU Clean out assy - Mill - String mill - J-baskets - Magnet - DC's - HWDP 21 :30 - 00:00 2.50 PULL N DFAL DECOMP RIH from 603' to 7450' 10/29/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Wash down from 7450 - Taking weight @ 7497' - PU - Slack off tag with 2K rotate string fell off - Con't wash down to 7524' with out rotary - PU 153 - SO 90 - ROT 112 00:30 - 03:00 2.50 PULL N DFAL DECOMP Wash - Ream junk I sand from 7524' to 7543' - WOM 4 to 8 - RPM 60 - TO 6 - GPM 360 - PP 1300 - Stopped washing @ 7543' - No Indication top of liner - Slack off without rotary to 7545' taking weight 5K - PU work string down taking weight 5K @ 7545' - PU shut down pump work string 4 to 5 times without pump taking weight 10K @ 7545' - Work string 3 times with pump taking weight 10K @ 7545' - Work string with rotary 25 RPM - Stack 10K weight @ 7545' - Torque smooth no spike- No erratic torque - No indication of top of liner other then taking weight at 2' below projected top Printed: 1117/2005 9:57:36 AM . . BP EXPLORATION Ope~atiøns Summary Report Page 5 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-O~ MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 10/15/2005 10/21/2003 14 Spud Date: 3/25/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 10/29/2005 03:00 - 04:30 1.50 PULL N DFAL DECOMP Pump sweep - RPM 50 - TO 7K - GPM 450 - PP 1660 - PU / SO several more times - Tag up 7545' 04:30 - 07:30 3.00 PULL N DFAL DECOMP Flow check - Well static - POH from 7540' to 603' 07:30 - 09:00 1.50 PULL N DFAL DECOMP Stand back BHA - LD mill - String mill - Magnet - J-baskets - Clean same - No Junk recovered 09:00·10:30 1.50 PULL N DFAL DECOMP MU BHA - RIH with DC's I HWDP - With 4 3/4' mill assy - To clean out isolation hanger 10:30 - 13:00 2.50 PULL N DFAL DECOMP RIH from 633' to 7545' 13:00 - 18:00 5.00 PULL N DFAL DECOMP Mill from 7545' to 7565 - Tag XO - WOM 4 to 6 - RPM 75 - TO on 11 - off 6 - GPM 300 - PP 1050 - PU 155 - SO 90 - ROT 112 18:00 - 19:30 1.50 PULL N DFAL , DECOMP Circulate sweep around - GPM 360 - PP 1400 - RPM 45 - TO 7K - Flow check - Well static 19:30 - 22:00 2.50 PULL N DFAL DECOMP POH from 7565' to 633' 22:00 - 23:00 1.00 PULL N DFAL DECOMP LD 4 3/4' Clean out assy - Clean boot baskets - No Junk - No junk marks on face of mill - 23:00 - 00:00 1.00 PULL N DFAL DECOMP Clear rig floor - LD Baker fishing tools - Moblize BHA to rig floor 10/30/2005 00:00 - 01 :00 1.00 PULL N DFAL DECOMP MU 2 3/4' clean out assy - RIH with DC's - HWDP 01 :00 - 02:30 1.50 PULL N DFAL DECOMP RIH from 624' to 7350' - (Time change 1 hr back) 02:30 - 03:30 1.00 PULL N DFAL DECOMP Cut drlg line - Top drive service 03:30 - 05:00 1.50 PULL N DFAL DECOMP RIH tag up @ 7565 - Establish milling parimeters - GPM 76 - PP 1150 off - 1250 to 1300 on - PU 155 - SO 90 - RPM motor 700 - Mill from 7565' to 7573' - Pump pressure increased to 1540 - Indication on top of prong - PU to 7570' 05:00 - 06:00 1.00 PULL N DFAL DECOMP Drop ball - Pump ball on seat to open circ sub - 18 spm @ 1150 psi - Did not open 06:00 - 06:30 0.50 PULL N DFAL DECOMP POH 10 stands - From 7570' to 6595' 06:30 - 07:00 0.50 PULL N DFAL DECOMP Pump @ 18 spm @ 1000 psi - Attempt to open circ sub - Did not open - Flow check - Well static 07:00 - 09:30 2.50 PULL N DFAL DECOMP POH from 6595' to 625' - Stand back BHA 09:30 - 10:30 1.00 PULL N DFAL DECOMP LD 2.79' Mill - MU 23/4' Shoe· RIH with BHA 10:30 - 13:00 2.50 PULL N DFAL DECOMP RIH from 630' to 7573' - Establish wash parimeters - PU 157- SO 88 - GPM 76 - PP 630 13:00 - 15:00 2.00 PULL N DFAL DECOMP Wash over prong - from 7573' to 7579.5' - 15:00 - 17:00 2.00 PULL N DFAL DECOMP Drop 5/8' ball to open circ sub - Pump ball on seat - Open circ sub - Pump sweep to surface - GPM 230 - PP 1070 - Flow check - Well static 17:00 - 20:00 3.00 PULL N DFAL DECOMP POH from 7570' to 630' 20:00 - 21 :00 1.00 PULL N DFAL DECOMP Stand back DC's - HWDP - LD Mill - Motor - Boot baskets - Magnet· XO's 21 :00 - 22:00 1.00 PULL N DFAL DECOMP MU Overshot Assy . RIH DC's - HWDP 22:00 - 00:00 2.00 PULL N DFAL DECOMP RIH from 645' to 7200' 10/31/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Con't RIH to 7570' 00:30 - 02:00 1.50 PULL N DFAL DECOMP Break Circulation - Displace well to seawater - Pump 30 bbl sweep - 390 bbl seawater - spot 50 bbl perf pill on bottom - BPM 11.5 - PP 2600 02:00 . 02:30 0.50 PULL N DFAL DECOMP Wash down @ 3 bpm - From 7576 to 7581' saw a small increase in pump pressure as overshot went over prong - Increase pump 10 BPM disk appered to shear @ 2900 psi - (Disk set to shear @ 3200) - Attempt to Pull prong 5K over - PU 155 . SO 90 02:30 - 03:00 0.50 PULL N DFAL DECOMP Flow check for 30 mins - Well static 03:00 - 03:30 0.50 PULL N DFAL DECOMP Pull 8 stands - @ 6800 Printed: 11f712005 9:57:36 AM . . BP EXPLORATION Operations Summary Report Page 6 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 10/15/2005 10/21/2003 14 Spud Date: 3/25/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 10/31/2005 03:30 - 04:00 0.50 PULL N DFAL DECOMP CBU - 7 BPM @ 920 psi - Flow check well 15 mins - Well static 04:00 - 06:00 2.00 PULL N DFAL DECOMP Blow down top drive - POH from 6800' to 645' 06:00 - 07:30 1.50 PULL N DFAL DECOMP Stand back BHA - No Fish recovered 07:30 - 08:00 0.50 PULL N DFAL DECOMP Rig service 08:00 - 14:30 6.50 PULL N DFAL DECOMP Wait on fishing tools 14:30 - 15:30 1.00 PULL N DFAL DECOMP MU BHA - MU JDC Hyd Overshot assy - RIH DC's - HWDP 15:30 - 18:30 3.00 PULL N DFAL DECOMP RIH from 651' to 7570' Fill pipe every 25 stands 18:30 - 20:30 2.00 PULL N DFAL DECOMP Attempt to engage prong - PU 145 - SO 90 - 16 spm @ 2080 psi - Wash from 7570' to 7578.6' - Tag with 10K down 100 psi PP increase - Expected top of prong 7573' - shut down pump - PU no overpull indicated - RIH tag 7982.4 without pump set down weight 10K - PU no over pull indicated - Monitor well - Well static - RIH tag up @ 7582.9' set down weight 15K without pump - PU no overpull indicated - RIH to 7582.4' set down 15K with 13 spm @ 1380 psi - Shut down pump - No overpull indicated - Pull 1 stand 20:30 - 23:00 2.50 PULL N DFAL DECOMP Monitor well - Well static - POH from 7500' to 646' 23:00 - 00:00 1.00 PULL N DFAL DECOMP Stand back HWDP - DC's - LD BHA 11/1/2005 00:00 - 00:30 0.50 PULL N DFAL DECOMP Con't LD BHA - No recovery of prong 00:30 - 01 :00 0.50 PULL N DFAL DECOMP Clear rig floor of tools ,01 :00 - 02:00 1.00 EVAL N DFAL DECOMP PJSM - Rig up Shlumberger E-Line i 02:00 - 04:30 2.50 EVAL N DFAL DECOMP RIH with GR/CCI - Taking weight @ 7528' - Collar above ¡ window 7466' - Top window 7491 - Bottom window 7501 - Did I not see collar below window @ 7507' - Work sting 2 to 3 times no progress below 7528' - POH with tools 04:30 - 06:00 1.50 EVAL N DFAL DECOMP PU 4.0 Caliber/CCL-GR - RIH - Caliber stopped in window @ 7496 - POH LD Logging tools 06:00 - 06:30 0.50 PULL N DFAL DECOMP RIH DC's - HWDP 06:30 - 08:00 1.50 PULL N DFAL DECOMP Slip and cut drlg line - Service Top drive 08:00 - 09:00 1.00 PULL N DFAL DECOMP Wait on Orders 09:00 - 09:30 0.50 PULL N DFAL DECOMP Moblize BHA to rig floor 09:30 - 10:00 0.50 PULL N DFAL DECOMP POH - HWDP - DC's 10:00 - 11:00 1.00 PULL N DFAL DECOMP MU BHA 4 3/4" Clean out assy 11 :00 - 14:00 3.00 PULL N DFAL DECOMP RIH with clean out assy from 631' to 7440'- Establish milling pari meters - PU 140 - SO 95 - ROT 115 - GPM 365 - PP 1640- RPM 60 - TO 4 14:00 - 15:00 1.00 PULL N DFAL DECOMP RIH with pump from 7440' to 7531' 3K down wt fell off - Con't I RIH to 7561 to 7566' taking 1 to 2K - Con't RIH to 7573 taking 3 to 5K - @ 7574' set down 10K - PU to 7565' - RIH to 7574' set down 10K - PU to 7567' - Rotate 60 RPM - TO 4 - Wash / Mill to 7581' WOM 2 to 3 - TO 3 to 4 - Pull up to 7448' - No Drag- Overpull 15:00 - 16:00 1.00 PULL N DFAL DECOMP Pump sweep around - Fine black to gray sand - Minimum metal 16:00 - 16:30 0.50 PULL N DFAL DECOMP RIH from 7448' to 7583 - Set down 15K - PU to 7573' - Wash from 7573 to 7584 - WOM 15K - RPM 60 - TO 5K - GPM 365 - ! PP 1600 - PU to 7573 16:30 - 17:00 0.50 PULL N DAFL DECOMP Pump sweep around - Fine black to gray sand - small amount metal off magnet's 17:00 - 19:30 2.50 PULL N DFAL DECOMP Mill from 7584 to 7586 - WOM 15 RPM 60 - TO 5.5 to 6 - GPM 365 - PP 1630 - Circulate @ 7561' - GPM 365 - PP 1600 - RIH to 7585' - Wash and mill from 7585 to 7594 - RPM 60 - GPM 365 PP 1630- Printed: 11/7/2005 9:57:36 AM · - BP EXPLORATION Qperatiøns Summary Re.pørt Page 7 of 7 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 MPS-01 WORKOVER DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 1 0/15/2005 10/21/2003 14 Spud Date: 3/25/2003 End: Date From - To Hours Task Code NPT Phase Description of Operations 11/1/2005 17:00 - 19:30 2.50 PULL N DFAL DECOMP 7585 to 7586 - 21 mins - WOM 3 to 5 - TO 5 to 6 7586 to 7587 - 16 mins - WOM 3 to 5 - TO 5.5 to 6.5 7587 to 7588 - 21 mins - WOM 3 to 5 - TO 6 to 7 7588 to 7590 - 7 mins - WOM 3 to 10 - TO 6.5 to 7.5 7590 to 7591 - 8 mins - WOM 10 - TO 7 7591 to 7592 - 7 mins - WOM 10 - TO 7.3 7592 to 7593 - 8 mins - WOM 10 - TO 7.3 7593 to 7594 - 7 mins - WOM 10 - TO 7.3 19:30 - 21 :00 1.50 PULL N DFAL DECOMP Pump sweep around - Fine black gray sand back - small amount metal off magnet's - Flow check - Well static 21 :00 - 23:00 2.00 PULL N DFAL DECOMP POH from 7594 to 631' 23:00 - 00:00 1.00 PULL N DFAL DECOMP LD - HWDP - DC's 11/212005 00:00 - 00:30 0.50 PULL N DFAL DECOMP LD - 4 3/4" Clean out assy 00:30 - 01 :00 0.50 PULL N DFAL DECOMP Clear rig floor 01 :00 - 01 :30 0.50 T A N DFAL ABAN MU Howco 7 5/8" 29.7# Cement retainer 01 :30 - 05:00 3.50 T A P ABAN RIH with retainer to 7200' 05:00 - 05:30 0.50 T A P ABAN Shut top rams - Perform injectivity test - 2 bpm 870 psi pumped 20 bbls 05:30 - 06:00 0.50 T A P 'ABAN Set retainer @ 7200' - Test casing to 2050 psi for 5 mins - Test good - Recheck injectivity 2 bpm @ 900 psi pumped 18 bbls 06:00 - 06:30 0.50 T A P 'ABAN Rig up cementing line - Blow down top drive 06:30 - 08:00 1.50 CEMT P .ABAN Pump 5 bbls H20-test lines to 3500 psi- Pump 25 bbls 15.8# class "G" cement- 5 bbls H20- Displace em!. w/ rig pump 43.6 bbls. 5 bpm 500 psi taking returns through choke- Sting into retainer- Squeeze 20 bbls em!. w/ 2bpm 850 psi- Unsting & pull iABAN 5 stands slowly to leave 5 bbls em!. on top of retainer. 08:00 - 08:30 0.50 T A P Pump 40 bbl nutplug sweep around to clean DP- Reciprocate 90' while pumping 12 bpm 08:30 - 14:00 5.50 T A P IABAN POH- Lay down 4" DP 14:00 - 15:00 1.00 TA P IABAN Clear rig floor - Mobilize casing equipment - Rig up to run , tubing 15:00 - 15:30 0.50 T A P IABAN Rig Service 15:30 - 19:00 3.50 RUNCOrvP ABAN PJSM - Run 4 1/2" kill string to 3650' - MU Tubing hanger - 88 joints total ran 19:00 - 19:30 0.50 RUNCOrvP ABAN RIH Land hanger - RILDS 19:30 - 20:00 0.50 EV AL P ABAN Test casing to 2050 psi - Hold for 30 mins - Record on chart - IABAN Test good 20:00 - 20:30 0.50 WHSUR P Install TWC - Test to 1500 psi - Test good 20:30 - 22:00 1.50 BOPSUF P IABAN PJSM - Blow down choke - LD casing equipment - Nipple down BOP's 22:00 - 23:30 1.50 WHSUR P ABAN PJSM - Nipple up adapter I tree - Test adapter to 5000 for 10 mins - Good test 23:30 - 00:00 0.50 WHSUR P ABAN RU to test tree 11/312005 00:00 - 01 :00 1.00 WHSUR P ABAN Test tree to 5000 psi - Test good - Pull TWC 01:00 - 01 :30 0.50 WHSUR P ABAN PJSM - RU to freeze protect well 01 :30 - 03:00 1.50 WHSUR P ABAN Test lines to 2000 psi - Pump 111 bbls diesel down annulus - Take retums from tubing to pits - BPM 2 @ 420 psi 03:00 - 04:00 1.00 WHSUR P ABAN U-Tube freeze protection from annulus to tubing 04:00 - 06:00 2.00 WHSUR P ABAN Suck diesel from lines and tree top - Install BPV - Secure well - Release rig @ 06:00 hrs 11/3/2005 Printed: 11n/2005 9:57:36 AM Tree: 4-1/16" - SM FMC . Wellhead: 11" x 4.S" SM G w/4.S" TCII T&B Tubing Han r 4" CIW "H" BPV profile j 20" x 34" insulated, 215 lIft A-53 ~ 103/4" 45.5 ppf L-80 BTRC (Drift ID = 9.794, cap. = .0961 bpf) 103/4" Super Seal II Float Shoe I 3140' I .... 75/8" 29.7 ppf, L-80, BTRC-mod production casing (drift ID = 6.750", cap. = 0.0459 bpf) 4.5",12.6#, L-80 IBTtbg. (cap. = .0152 bpf, id =3.958) KOP @ 400' 53+ degree from 1950' Max hole angle = 68 degree @ 5060' 58 degree @ Sleeve Cement retainer set @ 7200' e S' of cement on top) Window in 7-5/8" Casing @ 7487' - 7499' Well Angle @ window = 60° Baker Hook Wall Hanger inside 7-518" Window 7482' Baker Hook Wall Hanger outside 7-5/8" Window 7499' Note: PXN Plug in XN-Nipple ía> 7,578' Window in 75/8" Casing @ 7685' - 7697' Well Angle @ window = 73° Baker Tie Back Sleeve 7662' Baker Hook Wall Hanger inside 7-5/8" Window 7671' Baker Hook Wall Hanger outside 7-5/8" Window 7697' Baker Tie Back Sleeve 7885' ~ Baker ZXP Liner Top Packer 7,892' - Baker 7-5/8" x 5" HMC Liner Hanger 7,898'~ 7-518" Halliburton Float Collar 8054' 7-5/8" Halliburton Float Shoe 8139' DATE 04/16/03 10/21/03 72.50' (Doyon 14) 38.30' (Doyon 14) M PS-01\L I \LZ.~..e~~:~.: L ~ 61ro" H"" " @ 11 ,075' I "" ','""",,:00 ",M' NE U Per Lateral 80 jts. - 4 1/2" Slotted Liner Rat Hole p 12.6# L-80 IBT (7,755'-11,002') 30' r:::; Tie back sleeve 7,542' ;/ ~:~:; ;-5/8"X 51/2" ZXP Liner top pkr. 7,550' Baker 7-5/8"x 51/2" HMC Liner hanger. ~ ~ ~1t-~:3!; XI\J Ì'lH>r::,; I 2 7"ü' No-Go I 7.S7!!' \J G-t 2' r,:"le ,;hoe I 7.595' I . 66 jts. - 41/2" R3 Slotted Liner 12.6# L-80 IBT (7,747'-10,199') !ZíSS'>',S'>S1 ~ ~ 61/8" Hole td @ 10,530' / Blm Baker41/2" Guide Shoe 10,243' > OA Lateral .. ( Kill string @ 3,650' Note: Baker Hook wall hanger pulled in half and milled up, Prior to the cement plug. Rat Hole 287' ~ \..~ 1/8" Hole td @ 10,515' / Blm Baker41/2" "V" Float Shoe '--- . 10,514' 60 jts. - 41/2",12.6# L-80, IBT OB Lower Lateral Slotted Liner (8,117'-10,512') ~ REV. BY MDO MDO COMMENTS Drilled & Completed Doyon 14 NE Lateral & Completed Doyon 14 MILNE POINT UNIT WELL 5-01\ L \ \ L~ API NO: 50-029-23141-6' L2 API NO: 50-029-23141-60 L 1 API NO: 50-029-23141-00 BP EXPLORATION (AK) r;::0{\j1 l?·l· fM·' '1 ··1·· P~ ~J ;' ,¡ ~t . .,' I I ...~ :\... ,'I ··n', '..., '.;:¡ ~'\ U· !::!.\ . ~ : I ®:uuU ~ . 1.·f'U ... I.; fE. Þ.' ..IE~' 101 I HHIF in! ., 0w u:,~ . AI,~t¡1iA OIL AND GAS CONSERVATION COMMISSION Dan Kara Senior Drilling Engineer BP Exploration (Alaska), Inc. P.O, Box 196612 Anchorage, AK 99519-6612 FRANK H. MURKOWSKI, GOVERNOR 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: MPS-O 1 L2 Sundry Number: 305-344 Dear Mr. Kara: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing, A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Encl. ~ cfl1 ((-'1'-' ô zJ . STATE OF ALASKA . ALASKA OIL AND GAS CONSERVATION COMMISSIO~E. APPLICATION FOR SUNDRY APPROVÄ~O\} (} ~~ '[G05 20 AAC 25.280 . ~,ì - 1. Type of Request: o Abandon o Alter Casing o Change Approved Program II Suspend o Repair Well o Pull Tubing 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 99519-6612 KBE = 71.90' 8. Property Designation: ADL 380110 11. Total Depth MD (ft): 11075 Casing Structural Conductor Surface Intermediate Production Liner o Operation Shutdown 0 Perforate o Plug Perforations 0 Stimulate o Perforate New Pool 0 Waiver 4. Current Well Class: IBI Development 0 Exploratory o Stratigraphic 0 Service 9. Well Name and Number: 10. Field I Pool(s): Æ 11(,\ .... .,' ..~ o Other o Re-Enter Suspended Well o Time Extension 5. Permit To DrJll Number 203-169 V 6. API Number: / 50- 029-23141-61-00 MPS-01 L2 Milne Point Unit / Schrader Bluff Total Depth rvD (ft): I Effective Depth MD (ft): IEffective Depth rvD (ft): Plugs (measured): 4243 11075 4243 7090 Length Size MD rvD Burst 78' 20" 112' 112' 3105' 10-314" 3140' 2375' 7454' 7-5/8" 7487' 4222' 3563' 4-1/2" 7482' - 11045' 4219' - 4243' Perforation Depth MD (ft): I Perforation Depth rvD (ft): I Tubing Size: None (Below Plugs) None 4-1/2", 12.6# (Kill String) Packers and SSSV Type: None Junk (measured): None Collapse 1490 5210 470 2480 6890 8430 4790 7500 Tubing Grade: L-80 Packers and SSSV MD (ft): None Tubing MD (ft): 3655' 12. Attachments: IBI Description Summary of Proposal 0 BOP Sketch o Detailed Operations Program 14. Estimated Date for Commencing Operations: November 2, 2005 16. Verbal Approval: Date: 11/212005 Commission Representative: Tom Maunder 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Dan Kara Title Senior Drilling Engineer Signature ~ ____ Phone 564-5803 Commission Use Only 13. Well Class after proposed work: o Exploratory IBI Development 0 Service 'M11' ~PiigØedl~w 0 Abandoned o WINJ \0 WDSPL 15. Well St~us er proposed work: . o Gas OWAG OGINJ o Plug Integrity o Mechanical Integrity Test Conditions of approval: Notify Commission so that a representative may witness o Location Clearance o BOP Test Other: IGINAL RBDMS SFI. Contact John Rose, 564-5271 Date Prepared By NameINumber. " I O~ ) 05 Terrie Hubble, 564-4628 I Sundry Numbera>s-?' 11 1 ' COMMISSIONER APPROVED BY THE COMMISSION Date ~i~( . . - bp - To: Tom Maunder - AOGCC Date: November 3, 2005 From: John Rose - BPXA ACT Rotary Drilling Subject: MPS-01 (Well Suspension) On 11/02/2005, workover operations on MPS-01 were curtailed as the objectives of the workover were considered to be unachievable, Therefore, with verbal approval of the suspension from Tom Maunder with the AOGCC, well suspension operations were initiated on 11/01/2005 with the completion of those operations being on 11/03/2005, The suspension of the well included the plugging of the upper NE lateral of the well with a 20 barrel cement squeezed from below a retainer in the 7 5/8" main-bore casing at 7200' MD (5 bbls of cement (-100') were also placed above that retainer) while the lower two laterals (the OA and OB laterals) remained isolated by mechanical barriers which had been previously installed in the well, The cement plug was then pressure tested to 2050 psi for 30 minutes, MPS-01 was an Ugnu/Schrader Bluff tri-Iateral production well with laterals in the Schrader Bluff OB (the lower lateral), the Schrader Bluff OA (the middle lateral) and the Ugnu NE (the upper lateral), As the lower two laterals (OA & OB) were isolated by a packer assembly with a plug in the tail-pipe prior to drilling the upper lateral (NE) of the well in October of 2003, the intent of this recent workover was to remove the plug in the tail-pipe (the PXN plug in an XN nipple at 7578' MD) which would allow resumed production from the two lower OA and OB laterals of the well, In summary, as the workover progressed all attempts to access to the main-bore of the well below the upper lateral (as required to recover the plug in the tail-pipe at 7578' MD) proved to be unsuccessful due to what appears to be mechanical problems at the liner hanger for the upper lateral. It is generally concluded, that all of our clean-cut work efforts were either diverted into the upper lateral or possibly to some open-hole sidetracking event, The deepest clean-out on our final run into the well (using a 4 %" mill assembly spaced-out below a 6 %" string mill) bottomed-out at 7592' failing to encounter any of the designed "no-~.o's" which would have been an indicator that we indeed had access to the main-bore of the' well, 'That being the case, it was decided to suspend the well as detailed in this notice leaving the well above the suspension as a candidate for a future MPS-Pad sidetrack, (Note: A total of 3 Sundry notices will be submitted for the suspension of this well, one for each of the 3 laterals which are now isolated below the cement/retainer in the 7 5/8" casing in the main-bore of the well-7202',) -¡-------------- 4-1/16" - 5M FMC WeUtlea.d: 11" x 4.5" 5M Gen 6 wI 4.5" TCII T&B Tubing Hanger 4" CIW "H" BPV profile #Ift II bpf) Reaervoir FIWd Window in 7·5/8" Casing @ 7487' -7499' Well Angle @ window'" 60" Baker Hook Wall Hanger inside 7-5tf!t Window 7482' Baker Hook Wall Hanger outside 7-518" Window 7499' Window in 75/8" Casing @ 7685' - 7697' Well Angle @ window'" 73" Baker Tie Back Sleeve 7662' Baker Hook Wall Hanger inside 7-518" Window 7671' Baker Hook Wall Hanger outside 7-518" Window 7697' Baker Tie Back Sleeve 7885' f Baker ZXP Liner Top Packer 7,892 . Baker 7-5/8" x 5" HMC Liner Hanger 7,898'¿I 7-5/8" Halliburton Float Collar 8054' 7-5/8" Halliburton Float Shoe 8139' 04/16/03 10/21/03 08/09/05 MDO MDO DAJ Drilled & Completed Doyon 14 NE Lateral & Completed Doyon 14 Corrected Phoenix gauge depth ~ Orig. KB elev.::: Orig. GL. elev.= 10. Cameo 4.5" x 1" w/ BK-S latch sidepocket KGB-2 GLM ... 14) 14) I 2,095' I KOP @ 400' 53+ degree from 1950' Max hole angle'" 68 degree @ S060' 58 degree @ Sleeve Phoenix Discharge gauge (3.850 ID) 4.5" HES XC Dura slIding sleeve NOTE: ID change min. 2.840" Phoenix gauge ( 2.840" ID ) 4.5" x 3.S" X-Over 7-5/8" x 3,5" Baker 8-3 Perm. Packer 3.5" HE8 X-Nipple (2.813" ID) WLEG 1/8' Hole td 11,075' / HE$4.5" Floatstloe 11,045' 80 Slotted 12,6# ¡ST ~T¡e back sleeve ./ ::::~ ;-5I8'x 5112' ZXP Uner top pkr. Baker 7-5I8"x 5112' HMC Uner hanger. HE$ 3,5' XN-Nipple (2.750' No-Go ) 5-112" Muleshoe! 7,59S'1 Upper Lateral OA '1 '- 10. 1/8' I 8tm Baker 4 td Rat Hole 30' Rat Hole 287' "'I Float &l1oe A 10.514 ~:~he~¿{~~:~~~~~'¡ MPS-01 Current wI 4.5" TCII T&S Tubing Hanger 4" CIW "H" BPV profile I l 20" x 34" insulated, 215 I/ft A-53 Œf 103/4" 45.5 ppf L-aO BTRC (Drift 10 '" 9.794, cap. '" .0961 bpf) 10 3/4" Super Seal II Float Shoe 75/8" 29.7 pp1, L-BO, BTRC-mod production casing ( drift: 10 '" 6.750", cap. '" 0.0459 bpf) Window in 7-518" Casing @ 7487' - 7499' Well Angle @window'" 60· Baker Hook Wall Hanger inside 7-518" Window 7482' Baker Hook Wall Hanger outside 7-5/8" Window 7499' Note: PXN Pluº iO XN-Nipp e @ 7.578' Window in 75/8" Casing @ 7685' - 7697' Well Angle @ window'" 73" Baker Tie Back Sleeve 7662' Baker Hook Wall Hanger inside 7 -5/iJ" Window 7671' Baker Hook Wall Hanger outside 7-5/8" Window 7697' Baker Tie Back Sleeve 7885' r Baker ZXP Liner Top Packer 7,892' - Baker 7-5/8" x 5" HMC Liner Hanger 7,898' ~ 7-5/8" Halliburton Float Collar 8054' 7-5/S" Halliburton Float Shoe 8139' DATE 04/16/03 10/21/03 11/03/05 REV. BY MDO MDO AM COMMENTS Drilled & Completed Doyon 14 NE Lateral & Completed Doyon 14 Well Suspension Doyon 14 '" 72.50' (Doyon 14) slev.'" 38.30' (Doyon 14) KOP @ 400' 53+ degree from 1950' Max hole angle = 68 degree @ 5060' 58 degree @ Sleeve - Base of Diesel I 2,400' MD I ... ~ - 4.5" 12.6#, L-BO, 1ST Tubing I MD I Seawater (8.5 ppg) - Top of Cement I 7,090' MD I 5 bbl 15.S# class "G" cement - Howco EZSV Retainer 17,202' MD I - 20 bbI15.8# class "G" cement NE Upper Lateral 6118" Hole Id @ 11,075' / HE$4.5" Float shoe 11,045' 4 1/2" Slotted Liner Rat Hoie SO IBT (7,755'-11,002') 30' .,., .. OA Lateral 66 jts. - 4 1/2" RS Slotted Liner Rat Hole 12.6# L-80 laT (7,747'-10,199') 287' ~~'!~~~~;~~ole Id @ 10,530' / Blm Baker 4112" GUide Shoe 10,243' i tSi/S" Hole Id @ 10,515' / Btm Baker4112" "V" Float Shoe ~ f 10,514' OS Lower Lateral 60 jts. - 41/2",12.6# L-SO, laT Slotted Liner (8,117'-10,512') ~ MILNE PQINT ijNIT WELL $...01 API NO; 50-02~-23141-~O "-2 AP~ NO; 5Q-02~-2~14'-6Q l1 API NO: 50..02~-2~141-QQ BP EXPLORATION (AK) . ~ - /67' ~'s. T\'''\\~ ~\~-\~S ~.\-'-\-\~ 2J<t<è?Qs\ö--'~'(:~'\s. \J'v\.c--"f ¡\t~~)·-\û ~é~\<s.c~~~) T\\K= 0?P~\ s~c-\\a~~'-\ ,\~ \J'X'{'( \ \~ «"~~~~-d \\,~ ()'\J~\\Gb~, ~, s\~r:¿ ~\<D..c\~.. ~"<2, 0\- +~ \(l~\O-\~ \,V{ ~ \ \JE- (\«(D\)t~': ~~_ \-.~\~~~,~~~L. ,~.ll. ~"'C....~~ .G...\Cè. ~~S\~~ è> 0':>\>Q.1'\.~ . "Dr """:'i \¡)~ 0f~~~~ -x, CCrE>'ìJ (\ -\k," L ^ ß L· - L _ ~ ~ >~ . .- . . Q c::'\ '..L ( d-. ~~('j~o \J-..J.t~+\,-·4Yxdi~-\'~xba~ cz,~s~t0(cJ, R ~ - \ "j O~\'--· -\-\t~ d~ i\~~( SR+' I'-J~. ~O\~ ~ ~~- ~ c.; \D..\. s ~ "è \, \ G3Jed /6 ~ ~~,,~, A.. v\ -2Ö~ \X ~c\\~~ ~ ~~\(§~~ ú.-+--\-\......c¿ \~\~ \~L\\~~,. ~~CJ\~\\G"'á\~"> . . ,~\>::!L\~ \-,~~s ~\\,,'\ "-~ s.c..~ \,~ ~~ '<''<-C6s¡:,..''ì " C\ Å."---\ c..~""'MI<.v&. l ~,s,c;:,,,,~~ '1Ð 0 M-\:~"\<:"''-.J'" "-.Ì, \\ \DEe Qf~~' I \J'..j '\ \ "- S <L+ CJ- <t) '\;<3. C'-.J ~ S\;'Ù "-So\. ~~ \. V\..~~ ~o....µ''>.. ~ t((~ e . ~ð7J'-ltó? :\\ \ ). (Ç') WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 March 31, 2004 RE: MWD Fonnation Evaluation Logs MPS-01 L2, AK-MW-2714264 1 LIS fonnatted Disc with verification listing. PûPI#: 50-029-23141~1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 ./ , ./ / Date: ~<-:j/O "/ ·1/ Signed I /JA."J ol.t~ e e de) ~;, -/& T \ ~ ljSc\ WELL LOG TRANSMI1TAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 March 31, 2004 RE: MWDFonnationEvaluationLogs MPS-Ol L2PB1, AK-MW-2714264 1 LIS fonnatted Disc with verification listing. JlPI#: 50~29-23141-71 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd, Anchorage, Alaska 99649-6612 / Date: f(//5 if} ,V / Signed ÎL1 oiL I . STATEOFALASKA . ALASKÞ1 AND GAS CONSERVATION COM . ION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a, Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20MC 25.105 20MC 25,110 21. Logs Run: MWD , GR , RES, ABI , PWD , IFRlCASANDRA CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE BoTTOM SIZE 112' 42" 3140' 13-1/2" 7487' 9-7/8" 11045' 6-1/8" o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a, Location of Well (Governmental Section): Surface: 3375' NSL, 4714' WEL, SEC. 07, T12N, R11E, UM Top of Productive Horizon: 1420' NSL, 239' WEL, SEC. 06, T12N, R11E, UM Total Depth: 4509' NSL, 767' WEL, SEC. 06, T12N, R11 E, UM 4b, Location of Well (State Base Plane Coordinates): Surface: x- 566077' y- 6000045' Zone- ASP4 TPI: x- 570509 y- 6003410 Zone- ASP4 Total Depth: x- 569940 y- 6006494 Zone- ASP4 18, Directional Survey 181 Yes 0 No 22. CASING SIZE Wr.<PERFT. 92# 45.5# 29.7# 12.6# 34' 35' 33' 7482' 20" H-40 L-80 L-80 L-80 10-3/4" 7-5/8" 4-1/2" 23. Perforations oRen to Production (MD + TVD of To,e and Bottom Interval, Size and Number; if none, state' none"): 4-1/2" Slotted Liner MD TVD MD TVD 7755' - 11002' 4257' - 4243' One Other 5. Date Camp., Susp., or Aband. 10/21/2003 6. Date Spudded 10/16/2003 7. Date T.D. Reached 10/18/2003 8. Elevation in feet (indicate KB, DF, etc.) KBE = 71.90' 9. Plug Back Depth (MD+ TVD) 11075 + 4243 Ft 10. Total Depth (MD+TVD) 11075 + 4243' Ft 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL 1 b. Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 12. Permit Number 203-169 13. API Number 50- 029-23141-61-00 14, Well Number MPS-01L2 15. Field and Pool Milne Point Unit I Schrader Bluff 16. Lease Designation and Serial No. ADL 380110 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) 260 sx Arctic Set (Approx.) 946 sx PF 'L', 275 sx Class 'G' 160 sx PF 'E', 293 sx Class 'G' Uncemented Slotted Liner 24. SIZE 4·1/2'x 3-1/2", 12,6# x 9,2#, L-80 DEPTH SET (MD) 7292' PACKER SET (MD) 7242' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) 1800' PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc,): Hydraulic Pump Oll-Bsl GAs-McF WATER-Bsl 342 17 0 26. Date First Production: October 26, 2003 Date of Test Hours Tested PRODUCTION FOR 10/29/2003 6 TEST PERIOD .. Flow Tubing Casing Pressure CALCULATED ...Itr... Press. 24-HoUR RATE""" 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state '~none". Oll-Bsl None GAs-McF WATER-Bsl ".".!'Þ..~ y'.~~$ --.~Al 0 RIG I N A L CONTINUED ON REVERSE SIDE 01~ Form 10-407 Revised 2/2003 AMOUNT & KIND OF MATERIAL USED Freeze Protected with 75 Bbls of Diesel. I GAS-Oil RATIO 51 Oil GRAVITY-API (CORR) CHOKE SIZE .... Sf'- t()~ 25 20lß 28. GEOLOGIC MARKER. NAME MD TVD 29. ARMATION TESTS Include and brief y~marize test results, List intervals tested, and attach detailed supporting data as necessary. if no tests were conducted, state "None". TUZC MA MB1 MB2 MB2-1 MC SBF2-NA SBF21 SBF24-MF SBF1-NB SBF1-NBR SBF12 SBE4-NC SBE41 SBE2-NE 6344' 6906' 6955' 7061' 7217' 7298' 7358' 7362' 7403' 7408' 7423' 7448' 7458' 7470' 7488' 3694' 3924' 3948' 4000' 4080' 4123' 4155' 4157' 4179' 4181' 4189' 4202' 4207' 4213' 4223' None 30. List of Attachments: Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary. 31. I hereby certify that the fore~oing is true and correct to the best of my knowledge. Signed sond~~ Title Technical Assistant Date [1- ZO" 03 M PS-O 1 L2 203-169 Prepared By Name/Number: Sondra Stewman, 564-4750 Well Number Drilling Engineer: Walter Quay, 564-4178 Permit NO.1 Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None", ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 2/2003 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 10/9/2003 10/10/2003 10/11/2003 ~ .. BP AMOCO Operations Summary Report MPS-01 L2 MPS-01 L2 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 From - To Hours ¡ Task Code NPT. Phase 22:00 - 00:00 00:00 - 01 :30 01 :30 - 02:00 02:00 - 03:00 03:00 - 04:30 04:30 - 05:30 05:30 - 07:00 07:00 - 09:30 09:30 - 10:30 10:30 - 13:00 13:00 - 13:30 13:30 - 14:00 14:00 - 15:00 15:00 - 19:30 19:30 - 20:00 20:00 - 22:30 22:30 - 23:00 23:00 - 00:00 00:00 - 00:30 00:30 - 01 :30 01 :30 - 03:00 03:00 - 04:00 2.00 MOB 1.50 MOB 0.50 MOB 1.00 RIGU 1.50 PULL 1.00 PULL 1.50 PULL 2.50 PULL 1.00 PULL 2.50 PULL 0.50 PULL 0.50 PULL 1.00 PULL 4.50 PULL 0.50 PULL 2.50 PULL 0.50 PULL 1.00 PULL 0.50 PULL 1.00 PULL 1,50 PULL 1.00 PULL ".__.. n__..._ P PRE P P P PRE PRE PRE P DECOMP P DECOMP P P DECOMP DECOMP P P DECOMP DECOMP P P P P DECOMP DECOMP DECOMP DECOMP P P DECOMP DECOMP P N DECOMP SFAL DECOMP N DFAL DECOMP N SFAL DECOMP N SFAL DECOMP N SFAL DECOMP Page 1 of 5 Start: Rig Release: Rig Number: Spud Date: 10/10/2003 End: 10/10/2003 10/21/2003 Description of Operations __._....._._.____.______~____ __.. . ,___u __._____.___._ .._____n___ Lay liner - set matts for rig move Move rig over S-01 L2 well - shim rig Skid rig floor from move position to drlg position Rig up - Set rockwasher - Berm same - rig up rockwasher - Accept rig @ 03:00 hrs Rig up double valve on annulus - rig up circulating line from annulus to choke - Rig up on tree to circulate down tubing - move equipment for passage around rig with vac trucks - Pick up / make up lubricator to tree - Pull BPV - rig down lubricator - (No pressure on annulus) Take on seawater in the pits Displace freeze protect - con't circulate to get clean seawater to surface - Returns @ 70% - monitor well one hour - fill hole with 38 bbls - mix and spot XC polymer pill Monitor well for 30 minutes - fill hole took 38 bbls in 30 minutes Mix solids free Flo Pro LCM pill and 100 bbls 8.4 brine - pump 28 bbls solids free Flo Pro LCm pill - spot on bottom with 950 stks @ 30 spm 200 psi Set TWC - test from top to 1000 psi Help pull high line power from S-22 to S-01 L2 Nipple down tree Nipple up BOP's - Change out new choke hose with old choke hose - hose to long to make up Rig up test equipment Test BOP's - Top Rams - Blinds - Choke manifold - Hyd Kill/ Choke - Manual Kill/ Choke - Floor safety valves - Upper / lower 10BP valves - 250 low - 3500 high 5 mins each test - Annular 250 low - 2500 high 5 mins each test - Accumlator test - Did not test lower rams due to xo sub and pup joint to hanger up in body of rams - Will test lower rams after lay down tubing. Test witnessed by Jeff Jones with AOGCC Rig down test equipment Back out test joint - 4,5" tubing pup screwed into hanger stayed in hole when test joint backed out - Lay down test joint - RIH with TWC retrieving tool on dry rod to confirm no psi under TWC - POH with dry rod and TWC retrieving tool - Rig up pump in sub and 3.5" TIW 3,5" IF box X 4,5" IBT pin XO - PU 4.5" landing joint - screw into pup joint on top of hanger PJSM on pulling tubing string - Pick up to 150K - Work string - Pull up to 160 - Work string - Pull to 170K - Work string - Pull to 175K - Work string - Pull to 190K - Work string - Pull 200K - Work string - Pull to 210K - Work string - No success Set hanger back in tubing head - RILDS - Open door on bottom rams - attempt to back out 4.5" pup - Top of pup 3" below door - Attempt to back out pup using landing joint - landing joint broke at pup - Shut door - Un-bolt BOP from tubing head - Pick up stack - Break pup with 48" pipe wrench and come-along - Pull landing joint and 4,5" pup joint from hanger - Set stack down on tubing head - tighten up stack - Close Blinds - Retest body to 250 low - 3500 high for 5 minutes each test - Recorded on chart RIH with dry rod - check for pressure - No pressure - Pull TWC Printed: 10/27/2003 11:34:16 AM 'III(WI" - BP AMOCO Op~raUons Summary Report Page 2 of 5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 L2 MPS-01 L2 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 10/10/2003 10/21/2003 Spud Date: 10/10/2003 End: Date From - To Hours ! Task Code NPT Phase Description of Operations __._..__n _.n __..__ ..... -........... -... ... ........ .....--... .........-. --.-- . - ---- 10/11/2003 03:00 - 04:00 1.00 PULL N SFAL DECOMP with dry rod - Fill hole 58 bbls - Losses 100 bbl per hour 04:00 - 08:00 4.00 PULL N DFAL DECOMP Install shooting nipple - Change elevator bails - Rig up Howco slick line - RIH with 2.813 PXM plug - PXM plug set down 7524' - two licks fell through - Continue running in hole to 7660' SLM - (2.75 XN no-go at 7548' tubing measurements) - POH with plug 08:00 - 10:00 2,00 PULL N DFAL DECOMP RIH with 2.69" swedge with tubing end locator on slick line - located tubing end @ 7524' SLM - POH with swedge and locator 10:00-11:00 1,00 PULL N DFAL DECOMP RIH with X-line running tool to locate "X" nipple above packer- "X" nipple located 7494' SLM - POH with X-line running tool - (X nipple @ 7487' tubing measurements) 11 :00 - 12:00 1,00 PULL N DFAL DECOMP Rig down Howco slick line - Hole taking 52 bbl hour total loss for 12 hours 629 bbls 12:00 - 13:30 1.50 PULL N DFAL DECOMP Schlumberger rehead .31 braided line - PJSM on rigging up tools 13:30 - 15:00 1,50 PULL N DFAL DECOMP Rig up Schlumberger 15:00 - 17:00 2,00 PULL N DFAL DECOMP RIH with chemical cutter on E-line - @ 7490' - Make cut - POH 17:00 - 17:30 0,50 PULL N DFAL DECOMP Rig down Schlumberger 17:30 - 18:00 0,50 PULL P DECOMP Make up landing joint - Back out lock down screws - pull tubing free @ 165K - PU weight 11 OK - Pull hanger to surface 18:00 - 20:00 2,00 PULL P DECOMP Circulate surface to surface 385 bbls - @ 3 bpm 90 psi - 60% returns 20:00 - 20:30 0.50 PULL P DECOMP Break out landing joint - tubing hanger - circulating hose - XO - 3 1/2" TIW - 3 1/2" XO from IF box X IBT pin - Change bails 20:30 - 00:00 3.50 PULL P DECOMP Pull 4,5" tubing completion string - Lost 813 bbls last 12 hours for avg 67.75 bph 10/12/2003 00:00 - 04:00 4.00 PULL P DECOMP PJSM - Pull and Lay down 4.5" tubing completion string - Recovered 179 jts of 4,5" tubing - Phoenix gauge - HES Dual sliding sleave - Phoenix jet pump gauge sensor - XO - XO - .45 of X nipple - Left in hole .59 X nipple - 3,5" pup 7,75 - XO pup 1,75 - Baker packer 7,02 - XO pup 3,5" 1.74 - 3.5" pup jt 9,77 - 3,5" tubing jt 31.97 - XN nipple 1,29 - 3.5" XO pup 3.01 - 3.5" WLG 1.29 - (Recovered 97 clamps) 04:00 - 05:00 1.00 PULL P DECOMP Clear rig floor of all tubing equipment - Rig down casing equipment 05:00 - 06:00 1.00 PULL N SFAL DECOMP Install test plug - open annulus valve - Rig up testing equipment - Test lower rams to 250 low /3500 high 5 mins each test - Rig down test equipment - Pull test plug - Install wear ring - Close annulus valves 06:00 - 06:30 0.50 PULL N DFAL DECOMP Pick up milling assembly from v-door - PJSM with Baker Tech 06:30 - 09:00 2.50 PULL N DFAL DECOMP Make up milling assy - Per Baker hand - Change out to 4" handling tools 09:00 - 14:30 5.50 PULL N DFAL DECOMP Con't RIH with 4" dp from pipe shed to 7486' 14:30 - 00:00 9.50 FISH N DFAL DECOMP Mill 3.5" tubing - Packer from 7486' to 7499' - Varied WOM from 25K to 40K - RPM 50 to 110 - TQ 5K to 9K - GPM 100 to 300 - PP 70 to 1940 10/13/2003 00:00 - 01 :00 1.00 FISH N DFAL DECOMP Milling on packer from 7499' to 7501' - Varied WOM 25K to 50K - RPM 50 to 110 - GPM 100 to 300 TQ 5K to 9K - PP 70 to 700 01 :00 - 01 :30 0,50 FISH N DFAL DECOMP Push packer to 7544' - Set 50K on packer no movement 01 :30 - 02:30 1,00 FISH N DFAL DECOMP CBU - 4 bpm @ 510 psi 02:30 - 04:00 1.50 FISH N DFAL DECOMP POH with milling assy from 7544' to 7000' - Hole swabbing bad - Pulling 20K to 40K every 40' - (appears to be dragging packer Printed: 10/27/2003 11:34:16AM ..... . BP AMOCO o.perations Summary Report Page 3 of 5 Legal Well Name: MPS-01 L2 Common Well Name: MPS-01 L2 Spud Date: 10/10/2003 Event Name: REENTER+COMPLETE Start: 10/10/2003 End: Contractor Name: DOYON DRILLING INC. Rig Release: 1 0/21/2003 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations .--. .....--.. -------...--. - .. 10/13/2003 02:30 - 04:00 1,50 FISH N DFAL DECOMP up hole) - Pump out at 2 bpm from 7000' to 6589' - @ 6589' did not see any more overpulls - 6589' pull two stands to 6398' no swabbing no overpulls - (appears to have lost packer @ 6550') 04:00 - 06:00 2,00 FISH N DFAL DECOMP Blow down Top Drive - Con't POH from 6398' to BHA 06:00 - 07:00 1,00 FISH N DFAL DECOMP Stand back 3,5 HWP and 4 3/4 DC, clean out boot baskets and clear floor 07:00 - 07:30 0.50 FISH N DFAL DECOMP Make up spear and run in BHA 07:30 - 09:30 2,00 FISH N DFAL DECOMP Rih with spear to 7546 09:30 - 10:30 1.00 FISH N DFAL DECOMP Push fish from 7549 to 7649, latch on to packer 10:30 - 15:00 4.50 FISH N DFAL DECOMP Tripping out with packer, pull to 6837 hole swabbing, pumped out to 6452, drop ball open circ sub" trip out to BHA. 15:00 - 16:00 1.00 FISH N DFAL DECOMP Brake out spear and packer, lay down same, no tail pipe recover 16:00 - 16:30 0.50 FISH N DFAL DECOMP Make up BHA #3, 6.125 bit, bit sub, magnet, bumper sub,jars, 12 4 3/4 dC,15 HWP 16:30 -19:00 2.50 FISH N DFAL DECOMP Trip in with bit and magnet to 7,649 top of tail pipe 19:00 - 19:30 0.50 FISH N DFAL DECOMP Worked magnet, try to pick up cuttings, turn pipe slow and worked up and down slow 19:30 - 22:00 2.50 FISH N DFAL DECOMP Tripping out with magnet and bit. recover 2 # of metal cutting and 7 flat pieces 2 to 3" long 22:00 - 00:00 2.00 FISH N DFAL DECOMP Pick up BHA #4 spear for 3,5 9,2 tubing, tripping in hole 10/14/2003 00:00 - 00:30 0.50 FISH N DFAL DECOMP RIH in hole to top of fish @ 7649 00:30 - 01 :00 0,50 FISH N DFAL DECOMP Working in to fish, pushed fish to 7656, circ slow 01 :00 - 05:00 4,00 FISH N DFAL DECOMP Tripping out with tail pipe, pull to 7480 swabbing ., dragging 8 to 10,000#, pumped out to 6730,pull without swabbing 05:00 - 06:30 1,50 FISH N DFAL DECOMP Laying down fish, Clear floor 06:30 - 07:00 0,50 FISH P DECOMP Pickup BHA #5 Bit,Scraper,magnet 07:00 - 09:30 2,50 FISH P DECOMP Pickup 42 jts of pipe from pipe shed and trip in to top of liner @7662 09:30 - 12:00 2,50 FISH P DECOMP POH, lay down magnet and scraper, recover 2# of fine cutting on magnet. 12:00 - 13:00 1,00 STWHIP P PROD2 Pickup Baker HMC liner hanger and ZXP liner top packer and 3.5 tail pipe with PX plug in XN nipple 13:00 - 18:00 5,00 STWHIP P PROD2 Tripping in with packer to 7594, top of packer 7550', top of liner 7542.92 XN nipple 7578' 18:00 - 19:30 1,50 STWHIP P PROD2 Drop 29/32 ball and set packer, pumped ball down 1 bbl min 1100 psi, set hanger with 1800, set packer with 3200 psi, test backside with 1000 psi, released from hanger 19:30 - 22:00 2,50 STWHIP P PROD2 Tripping out with running tools, lay down same 22:00 - 00:00 2,00 STWHIP P PROD2 Rig up slick line unit and run in hole with Prong and set in PX plug @ 7578' , rig down slickline unit 10/15/2003 00:00 - 00:30 0,50 STWHIP P PROD2 Test csg to 1000 psi for 30 min. 00:30 - 04:00 3,50 STWHIP P PROD2 Pickup space out pups, whipstock, BHA # 6, test MWD 04:00 - 07:00 3,00 STWHIP P PROD2 Tripping in with whipstock 07:00 - 07:30 0,50 STWHIP P PROD2 Orient whipstock 20 drgrees to right, set down on liner top @ 7543' , shear Whipstock, ,Displace well to 9.5 Flo-Pro mud 07:30 - 10:00 2.50 STWHIP P PROD2 Mill window from 7487 to 7499 Drill to 7510, work window 10:00 - 10:30 0,50 STWHIP N DFAL PROD2 Lost 500 psi. after picking up off bottom, lost Mwd Pulses at same time, surface test Eqp, flow check well 10:30 - 14:00 3,50 STWHIP N DFAL PROD2 POH, looking for wash out, Left in hole 6.25 ' of Bumper sub, MWD too, Float sub,1 jt HWP, upper mill, lower mill, starter mill, 106.88 ft. top of fish is 7403' 14:00 - 15:00 1,00 STWHIP N DFAL PROD2 M/U fishing BHA, 5.75 over shot with 4 3/4 grapple, bumper Printed: 10/27/2003 11:34:16 AM ~ A BPAMOCO Operations Summary Rep·ort Page 4 of 5 Legal Well Name: MPS-01 L2 Common Well Name: MPS-01 L2 Spud Date: 10/10/2003 Event Name: REENTER+COMPLETE Start: 10/10/2003 End: Contractor Name: DOYON DRILLING INC. Rig Release: 10/21/2003 Rig Name: DOYON 14 Rig Number: ¡ I Date ¡ From - To Hours ¡ Task ¡Code NPT,< Phase Description ofOperatibns h _..._.______ ___ .__" - __h...O_____ ___ 10/15/2003 14:00 - 15:00 1.00 STWHIP N DFAL PROD2 sub, jars,12 dc" 15 HWP 15:00 - 16:30 1.50 STWHIP N DFAL PROD2 Tripping in to 7283 16:30 - 18:00 1,50 STWHIP N DFAL PROD2 Slip and cut drilling line, seNice top drive 18:00 - 18:30 0.50 STWHIP N DFAL PROD2 Circ and worked over fish @ 7403' string pressure up fish plugged, pull fish free with 150,000 # string wt was 135,000 18:30 - 22:30 4,00 STWHIP N DFAL PROD2 Tripping out with fish, Laying down same 22:30 - 23:00 0.50 STWHIP P PROD2 Pickup Johnny Wacker and wash BOPS 23:00 - 00:00 1.00 BOPSURP PROD2 Pull Wear ring, Test Bops and manifold 250-3500 psi 5 min per test, Test Hydrill 250-2500 psi 5 min per test, the right to witness test was wavier by John Crisp AOOGC 10/16/2003 00:00 - 03:00 3.00 BOPSURP PROD2 Test Bops and manifold 250-3500 psi 5 min per test, test Hydrill 250-2500 psi 5 min per test, the right to witness test was wavier by John Crisp AOOGC, install wear ring 03:00 - 05:00 2.00 DRILL P PROD2 Pick up BHA # 8 FM2643 bit with 3X13, 43/4 Sperry drill 1 ,83 bend,4 3/4 GRlRESIDM, 4 3/4 PWDITM, 3 flex dc, jars, 05:00 - 09:00 4,00 DRILL P PROD2 Tripping in hole, Picking up 93 jts of pipe from pipe shed 09:00 -10:00 1.00 DRILL P PROD2 Orient and slide tru window with no problem, Drill 7510 to 7521" 10:00 - 10:30 0.50 DRILL P PROD2 Pull tru window, perform FIT 9,5 mw, TVD 4228, 350 psi = 11,0 EMW 10:30 - 00:00 13.50 DRILL P PROD2 Directional Drill 7521' to 8245' with 80 rpm 254 gals, 2500 psi AST 5,08, ART 5.92, TQ 5K 10/17/2003 00:00 - 00:00 24.00 DRILL P PROD2 Directional Drill 8245' to 9680 with 80 rpm 254 gals, 2680 psi AST 7,66 ART 8.83 ADT 16.49 10/18/2003 00:00 - 09:00 9.00 DRILL P PROD2 Directional Drill 9,680 to 10393' with 80 rpm 254 gals, 2650 psi Went out top of pay @ 10,035 09:00 - 09:30 0.50 DRILL N DPRB PROD2 Circ, for open hole side track with 80 rpm, 250 gals min 2,250 psi 09:30 - 10:00 0.50 DRILL N DPRB PROD2 Pump out to 9913' with full drilling rate 10:00 - 12:30 2.50 DRILL N DPRB PROD2 Preform open hole side track, troughing low side side track @ 9968 12:30 - 23:30 11.00 DRILL P PROD2 Directional Drill 9,968' to 11,075' TD with 80 rpm 254 gals, 2650 psi AST 3,09 ART 9.83 23:30 - 00:00 0,50 CASE P COMP Circ with 280 gals min. 2900 psi 90 RPMS 10/19/2003 00:00 - 05:30 5.50 CASE P COMP Circ 7 bottoms up with 280 gals min. 2900 psi 90 RPMS, (Knocking ice build up off derrick before we trip, Started @ 1 :00 am) 05:30 - 09:30 4.00 CASE P COMP Pumping out to Window@ 7,499 with full drilling rate 11,075 to 7,520' 09:30 - 10:00 0.50 CASE P COMP RIH with 5 stands to 8,000 ft., Pumping out to window with full drilling rate 8,000 to 7,520 10:00 - 13:00 3.00 CASE P COMP Slug pipe, Tripping out to BHA 13:00 - 14:00 1.00 CASE P COMP Lay down BHA 14:00 -16:00 2.00 CASE P COMP M/U Whipstock hook assem., down load and upload MWD, 16:00 - 18:00 2.00 CASE P COMP RIH to 6700' 18:00 - 19:00 1.00 CASE P COMP Slip and cut Drilling line, seNice top drive 19:00 - 19:30 0.50 CASE P COMP RIH to 7492' 19:30 - 21 :00 1.50 CASE P COMP Orient hook assem , engage whipstock and pull free 21 :00 - 22:30 1.50 CASE P COMP Tripping out to BHA 22:30 - 00:00 1.50 CASE P COMP Laying down BHA 10/20/2003 00:00 - 02:00 2.00 CASE P COMP Laying down whipstock and space out jts" clear floor of tools 02:00 - 03:00 1,00 CASE P COMP Rig up to pick up liner, PJSM 03:00 - 06:00 3.00 CASE P COMP Picking up one bend shoe jt. 4.5, 12,6#, L-80, solid liner and 80 Printed: 10/27/2003 11:34:16AM . . 'Page 5 of 5 BP AMOCO Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-01 L2 MPS-01 L2 REENTER+COMPLETE DOYON DRILLING INC. DOYON 14 , Date From - To Hours Task Code I NPT Phase 10/20/2003 03:00 - 06:00 3.00 CASE P COMP 06:00 - 09:00 3.00 CASE P COMP 09:00 - 10:00 1.00 CASE P COMP 10:00 - 14:00 4.00 CASE P COMP 14:00 - 16:00 2.00 CASE P COMP 16:00 - 17:00 1.00 CASE P COMP 17:00 - 19:30 2.50 CASE P COMP 19:30 - 23:00 3.50 CASE P COMP 23:00 - 00:00 1.00 RUNCOIIIP COMP 10/21/2003 00:00 - 11 :30 11.50 RUNCOIIIP COMP 11 :30 - 12:00 0.50 RUNCOIIIP COMP 12:00 - 12:30 0.50 RUNCOIIIP COMP 12:30 - 13:00 0,50 RUNCOIIIP COMP 13:00 - 14:00 1.00 RUNCOIIIP COMP 14:00 - 15:00 1,00 RUNCOIIIP COMP 15:00 - 16:30 1,50 RUNCOIIIP COMP 16:30 - 17:30 1,00 RUNCOIIIP COMP 17:30 - 18:30 1,00 RUNCOIIIP COMP 18:30 - 21 :00 2.50 RUNCOIIIP COMP 21 :00 - 22:30 1.50 RUNCOIIIP COMP Start: Rig Release: Rig Number: Spud Date: 10/10/2003 End: 10/10/2003 10/21/2003 Description of Operations jts 4,5 12,6# slotted liner and 6 jts 4.5, 12.6#, L-80 solid liner w/ two centralizers per jt. total of 87 jts, 3,538 ft, Baker hook wall hanger Tripping in with liner, Took two trys to get out window, hook hanger on 2nd try, liner up wt 145k down wt 85k, shoe @ 11044 top of liner 7482 Drop ball pump down @ 1.5 bbls min, release from liner 3200psi, pickup to verify release, lost 25K, shear ball with 4200 psi Tripping out, laying down excess drlg pipe, and running tools, clear floor Pick up Johnny Wacker and tripped in to 7464' Circ two bottoms up 10 bbls min 2550 psi, 100 rpms Displace hole with 8.8 brine, displace brine with 9.2 Brine w/ corrosion inhibitor @ 10 bbls min, 2550 psi, 100 rpms Laying down drill pipe Pull wear ring, rig up to run tubing, count pipe PJSM - Ran 3-1/2" tail pipe assembly, Baker S-3 Packer, Phoenix Jet Pump Gauge Sensor, 4-1/2" XD Dura Sliding Sleeve and Phoenix Discharge Pressure Gauge with I-wire. Continued running 4,5" completion with I-Wire and Cannon Clamps on every joint. - Total joints ran 1734,5" L-80 12,6# IBT tubing - Pick up and make up landing jt and hanger - make up I-wire to hanger and test. PU weight 106K SO weight 90K, 176 Cannon Clamps installed. Land tubing hanger. RILDS, Dropped Prong w/ Rollers. Rigged up to pump down tubing to set packer. Pressured up on tubing to 4000 psi to set slips and element on hanger. Pressure decreased from 4000 psi to 3680 psi in 5 minutes. Bleed off pressure, Tested 7-5/8" X 4-1/2" annulus to 500 psi. Good test. Backed out landing joint. Installed 1WC with dry rod. Installed Landing joint and test 1WC to 1000 psi. Good Test. Lay down landing jt. clear floor Nipple down BOPS Nipple up 4 1/16 Tree and FMC 11" X 4 1/16 adapter. run control line tru and test same, Test adapter to 5,000 psi, test tree cavity to 4,000 psi Rig up Lubricator, pill1WC, rig up First Energy pump truck Test TBG to 4,000 psi, leaking at 100 psi per min., bleed to 1,150 psi after 30 min., no movement in annulus, PX plug leaking ?, pressure TBG up to 3,000 psi and test Annulus to 4,500 psi for 10 min., packer holding, shear DCK valve when pressure in TBG bleed down to 2,000 psi. Pump 75 bbls of diesel down annulus with First Energy 2 bbls min. 1,200 psi, rig up and U-Tube to TBG, freeze protection to 1 800 ft Install BPV and test to 1000 psi, secure Tree Rig release to move to MPK-21A @ 22.30 hrs 10/2102003 Printed, 10/27/2003 11:34:16AM Legal Name: Common Name: Test Date -.- 10/16/2003 MPS-01 L2 MPS-01 L2 Test Type Test Depth (TMP) 7,521.0 (ft) FIT BP AMOCO Leak-Off Test Summary Test Depth (TVD) 4,225.0 (ft) AMW 9,50 (ppg) Surface Pressure i Leak Off Pressure (BHP) : 350 (psi) 2,435 (psi) Page 1 of 1 EMW ...-.......-- 11.09 (ppg) . . Printed: 1012712003 11:34:05AM . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well MPS-01 L2 Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey Projected Survey: 9,936.16' MD 9,987.58' MD 11,075.00' MD (if applicable) . Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ~~~\)-\~ ~03-lfÞl 15-Nov-03 h. ..~, <.', :\. DEe 08 2003 Alaska I;, AnCl¡Oftì!;ie . . Survey Ref: svy1300 Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPS MPS-01L2 Job No. AKZZ0002714264, Surveyed: 19 October, 2003 Survey Report 7 November, 2003 Your Ref: API 500292314161 Surface Coordinates: 6000044.6,5 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid) Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True) Kelly Bushing Elevation: 71.90ft above Mean Sea Level Kelly Bushing Elevation: 71.90ft above Project V Reference Kelly Bushing Elevation: 71.90ft above Structure spe............y-suil'1 DR I L. L.ING^^'se AV I c: IE S A Halliburton Company Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01L2 Your Ref: API 500292314161 Job No. AKZZ0002714264, Surveyed: 19 October, 2003 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9936,16 90.430 322.130 4180,22 4252,12 5523.89 N 4629.24 E 6005609.28 N 570657.12 E 7127.36 Tie On Point 9987,58 88.950 323.330 4180,50 4252.40 5564.80 N 4598.10 E 6005649,92 N 570625.62 E 3,705 7146.03 Window Point 10033.43 87.160 322.120 4182.05 4253,95 5601.27 N 4570.35 E 6005686.13 N 570597.55 E 4.711 7162.67 10083.89 88.640 322.060 4183.90 4255.80 5641 .05 N 4539.37 E 6005725.64 N 570566.21 E 2.935 7180.47 10129.17 90.120 320.570 4184,39 4256,29 5676.39 N 4511.07 E 6005760.73 N 570537.60 E 4,638 7195.86 . 10180.15 90.430 321.160 4184.15 4256.05 5715,93 N 4478.89 E 6005799,98 N 570505.08 E 1.307 7212.83 10226.22 89.880 319.980 4184.02 4255.92 5751.52 N 4449.63 E 6005835.31 N 570475,51 E 2.826 7227.93 10277,04 90.000 319.390 4184.08 4255,98 5790.27 N 4416.75 E 6005873.77 N 570442.28 E 1.185 7243,85 10322.06 90.000 320.140 4184.08 4255.98 5824,63 N 4387.67 E 6005907.87 N 570412.90 E 1,666 7258.01 10377.13 90.120 319.880 4184.02 4255.92 5866,83 N 4352.28 E 6005949.75 N 570377,14 E 0.520 7275.56 10418.73 90.190 320.440 4183.91 4255.81 5898,77 N 4325.63 E 6005981.46 N 570350,21 E 1.357 7288.92 10469.09 91.290 322.500 4183.26 4255.16 5938.16 N 4294.27 E 6006020.57 N 570318.49 E 4.637 7306,17 10514.53 91.420 322.470 4182.18 4254.08 5974.19 N 4266.60 E 6006056.35 N 570290.51 E 0.294 7322.49 10565.54 91.420 322,340 4180.92 4252.82 6014.60 N 4235.49 E 6006096.48 N 570259.05 E 0.255 7340.75 10611.45 91.360 322.200 4179.80 4251.70 6050.90 N 4207.41 E 6006132.53 N 570230.64 E 0.332 7357.07 10660.29 91.230 322.680 4178.70 4250.60 6089,60 N 4177.64E 6006170,97 N 570200.53 E 1.018 7374.58 10705.25 91.670 323.110 4177.56 4249.46 6125.45 N 4150,53 E 6006206.58 N 570173.10 E 1,368 7391.03 10756.35 91.170 322.490 4176.30 4248.20 6166.14 N 4119,64E 6006246.99 N 570141.86 E 1.558 7409.64 10801 .48 91.540 321,310 4175.23 4247.13 6201 .64 N 4091.80 E 6006282.25 N 570113.71 E 2,739 7425.42 10849.47 91,300 321.570 4174.04 4245.94 6239.16 N 4061.90 E 6006319.50 N 570083.47 E 0.737 7441.84 10897.73 91,230 320.770 4172,97 4244,87 6276.74 N 4031.65 E 6006356,81 N 570052.89 E 1.664 7458.13 10948.20 90.680 321.650 4172.13 4244.03 6316.07 N 4000.03 E 6006395.87 N 570020.93 E 2.056 7475,21 . 10994.18 90.560 320.710 4171,64 4243.54 6351.89 N 3971.21 E 6006431 .43 N 569991,79 E 2.061 7490,75 11004.62 90,430 320.970 4171.55 4243.45 6359.99 N 3964,62 E 6006439.47 N 569985.13 E 2.784 7494,22 11075.00 90.430 320.970 4171.02 4242.92 - 6414.66 N 3920.30 E 6006493,74 N 569940.33 E 0.000 7517,75 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North, Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 31.430° (True). Magnetic Declination at Surface is 25.1700 (12-0ct-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 11075.00ft., The Bottom Hole Displacement is 7517.75ft., in the Direction of 31.4310 (True). 7 November, 2003 - 13:42 Page 2 of 3 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01L2 Your Ref: API 500292314161 Job No. AKZZ0002714264, Surveyed: 19 October, 2003 BP EXPLORA nON (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 9936.16 4252.12 5523.89 N 4629.24 E Tie On Point . 9987.58 11075.00 4252.40 4242.92 5564.80 N 6414.66 N 4598.10 E Window Point 3920.30 E Projected Survey Survey tool program for MPS-01 L2 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 245.00 0.00 245.00 244.99 11075.00 244.99 AK-1 BP _HG (MPS-01 PB1 Gyro) 4242.92 AK-6 BP _IFR-AK (MPS-01 PB1) . 7 November, 2003 - 13:42 Page 3 of 3 DrillQuest 3.03.05.005 . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . Re: Distribution of Survey Data for Well MPS-01 L2 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey Projected Survey: 9,936.16' MD 9,987.58' MD 11,075.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) K~'\'\\\'- ~ ,~ð:3 ~) !.o I 15-Nov-03 RECEIVED DEC 082003 Aj,;¡ska on & Gas Cons, CommiS8i0n Anchorage . Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPS MPS-01 L2 MWD 12 October, 2003 Job No. AKMW0002714264, Surveyed: Survey Report 2003 7 November, . Your Ref: API 500292314161 Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Survey Ref: svy1301 Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid) Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True) Kelly Bushing Elevation: 71.90ft above Mean Sea Level Kelly Bushing Elevation: 71.90ft above Project V Reference Kelly Bushing Elevation: 71.90ft above Structure spe""''''''y-SUil'1 DAiL.L.ING sieAVIc:es A Halliburton Company Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01L2 MWD Your Ref: API 500292314161 Job No. AKMW0002714264, Surveyed: 12 October, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9936,16 90.430 323.420 4180.33 4252.23 5539.84 N 4640.43 E 6005625.33 N 570668.17 E 7146.81 Tie On Point 9987.58 88.950 324.570 4180.60 4252.50 5581.44 N 4610.21 E 6005666,66 N 570637.58 E 3.645 7166,54 Window Point 10033.43 87.160 323.480 4182.16 4254,06 5618.52 N 4583.29 E 6005703.50 N 570610.33 E 4.570 7184.15 10083.89 88.640 323,270 4184.01 4255.91 5658.99 N 4553,21 E 6005743.70 N 570579.90 E 2.962 7202.99 10129.17 90,120 322.200 4184.50 4256.40 5695.02 N 4525.80 E 6005779.49 N 570552.16 E 4,033 7219.44 . 10180,15 90.430 322.650 4184.25 4256.15 5735.42 N 4494.71 E 6005819.62 N 570520.72 E 1.072 7237.71 10226.22 89.880 321.400 4184.13 4256.03 5771.74 N 4466.36 E 6005855.68 N 570492.05 E 2.964 7253.91 10277.04 90.000 320.710 4184.18 4256,08 5811,26 N 4434.42 E 6005894,92 N 570459.76 E 1,378 7270.98 10322.06 90.000 321,360 4184.18 4256.08 5846.27 N 4406.11 E 6005929.67 N 570431 .14 E 1 .444 7286.08 10377.13 90.120 321,100 4184.13 4256,03 5889.20 N 4371.62 E 6005972.30 N 570396,28 E 0.520 7304,74 10418.73 90.190 321,140 4184.01 4255.91 5921.59 N 4345,51 E 6006004.45 N 570369.88 E 0.194 7318.76 10469.09 91.290 323.000 4183.36 4255.26 5961,31 N 4314.56 E 6006043.89 N 570338.58 E 4.291 7336,50 10514.53 91 .420 322.920 4182.29 4254.19 5997.57 N 4287.19 E 6006079.91 N 570310.90 E 0.336 7353.18 10565.54 91 .420 322.540 4181.02 4252.92 6038.15 N 4256,31 E 6006120.22 N 570279.66 E 0.745 7371.70 10611.45 91.360 322.500 4179.91 4251.81 6074,57 N 4228,39 E 6006156,39 N 570251.41 E 0.157 7388,21 10660.29 91.230 322.720 4178.81 4250.71 6113.36 N 4198.74 E 6006194.92 N 570221.42 E 0.523 7405.86 10705.25 91.670 323.080 4177.67 4249.57 6149.21 N 4171.63 E 6006230,53 N 570193.99 E 1.264 7422.31 10756.35 91,170 322.880 4176.40 4248.30 6190.00 N 4140.87 E 6006271.04 N 570162.87 E 1.054 7441.07 10801.48 91.540 322.320 4175.34 4247.24 6225.84 N 4113.46 E 6006306,64 N 570135.15 E 1 .487 7457.36 10849.47 91.300 322.330 4174.15 4246.05 6263,81 N 4084.14 E 6006344.35 N 570105.50 E 0.501 7474.47 10897,73 91.230 321.760 4173,08 4244.98 6301.85 N 4054.47 E 6006382,13 N 570075.49 E 1.190 7491.46 10948.20 90.680 322,620 4172,24 4244.14 6341.72 N 4023.53 E 6006421.72 N 570044.20 E 2.022 7509,35 . 10994,18 90.560 321,830 4171.74 4243.64 6378.06 N 3995.37 E 6006457,81 N 570015.71 E 1.738 7525.67 11004,62 90.430 322.420 4171.65 4243.55 6386,30 N 3988.96 E 6006465,99 N 570009.23 E 5,787 7529.36 11075.00 90.430 322.420 4171.12 4243.02 6442.08 N 3946.04 E 6006521.39 N 569965.82 E 0.000 7554.57 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North, Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 31.430° (True). Magnetic Declination at Surface is 25.170° (12-0ct-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 11075.00ft., The Bottom Hole Displacement is 7554.57ft., in the Direction of 31.489° (True). 7 November, 2003 - 13:43 Page 2 of 3 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01L2 MWD Your Ref: API 500292314161 Job No. AKMW0002714264, Surveyed: 12 October, 2003 BP EXPLORA nON (ALASKA) INC. Milne Point Unit BPXA Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 9936.16 4252.23 5539.84 N 4640.43 E Tie On Point . 9987.58 11075.00 4252.50 4243,02 5581.44 N 6442.08 N 4610.21 E Window Point 3946.04 E Projected Survey Survey tool program for MPS-01 L2 MWD Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0,00 245.00 0,00 245.00 244.99 11075.00 244.99 AK-1 BP _HG (MPS-01 PB1 Gyro) 4243.02 MWD Magnetic (MPS-01 PB1 MWD) . 7 November, 2003 - 13:43 Page 3 of 3 DrillQuest 3.03.05.005 . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . Re: Distribution of Survey Data for Well MPS-01 L2 PB1 Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey Projected Survey: 7,241.36' MD 7,487.00' MD 10,393.00' MD (if applicable) d03-I(Q~ 15-Nov-03 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) K~~\"~ RECE!VE[) DEC 08 2003 AJ_a OIî & Gas Cons. Commission Anchorage Halliburton Sperry-Sun Milne Point Unit SPXA Milne Point MPS MPS-01L2 PS1 . Job No. AKZZ0002714264, Surveyed: 18 October, 2003 Survey Report 14 November, 2003 Your Ref: API 500292314171 Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 . Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid) Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True) Kelly Bushing Elevation: 71.90ft above Mean Sea Level Kelly Bushing Elevation: 71.90ft above Project V Reference Kelly Bushing Elevation: 71.90ft above Structure spel'""'I'""'Y-SUI'1 é R I: I... 1...1 NG 5 ERyn::::^eS A Halliburton Company Survey Ref: svy1298 Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01L2 PB1 Your Ref: API 500292314171 Job No. AKZZ0002714264, Surveyed: 18 October, 2003 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 7421.36 58.440 37.430 4116,37 4188.27 3279.15 N 4429.47 E 6003362.86 N 570477.21 E 5107.80 Tie On Point 7487.00 59.720 36.460 4150.10 4222.00 3324.16 N 4463.31 E 6003408.17 N 570510.66 E 2.326 5163.85 Window Point 7533.37 66.810 36.950 4170,95 4242.85 3357.34 N 4488.05 E 6003441 .56 N 570535.10 E 15,319 5205.06 7584.18 77.510 37.430 4186.49 4258.39 3395.81 N 4517.25 E 6003480,29 N 570563.96 E 21.078 5253.12 7630,32 87.590 37,830 4192.47 4264.37 3431.99 N 4545.15 E 6003516.72 N 570591.54 E 21.863 5298.54 . 7678.19 95.000 38,770 4191.39 4263,29 3469,52 N 4574,79 E 6003554.51 N 570620.84 E 15.603 5346.02 7726.98 94.130 38.920 4187.50 4259.40 3507.40 N 4605.29 E 6003592.66 N 570651,01 E 1.809 5394.25 7776,70 95.930 34.850 4183.14 4255.04 3547.01 N 4635.01 E 6003632.52 N 570680.38 E 8.922 5443.54 7823.69 95,870 36.290 4178.31 4250.21 3585.02 N 4662,20 E 6003670,78 N 570707.23 E 3.051 5490,16 7874,10 91,730 32.960 4174.97 4246.87 3626.40 N 4690.77 E 6003712.41 N 570735.43 E 10.530 5540.36 7920.05 91.910 32.800 4173.51 4245.41 3664,97 N 4715.70 E 6003751.20 N 570760.02 E 0.524 5586.27 7967.12 91.600 31.450 4172.07 4243.97 3704,82 N 4740.72 E 6003791.26 N 570784.69 E 2.941 5633,32 8016.01 90,190 26.760 4171.31 4243.21 3747.51 N 4764.49 E 6003834.17 N 570808.08 E 10,016 5682,14 8064.17 90,560 23.450 4170.99 4242.89 3791.12N 4784.92 E 6003877.95 N 570828,12 E 6,916 5730,00 8113,05 89.080 20,000 4171.14 4243.04 3836.52 N 4803.01 E 6003923.51 N 570845,81 E 7.680 5778.18 8161.58 89.570 17.200 4171,72 4243.62 3882,50 N 4818.49 E 6003969.63 N 570860.88 E 5.857 5825.49 8205.00 89.880 18.370 4171.92 4243.82 3923.85 N 4831,75 E 6004011.09 N 570873,77 E 2,788 5867,68 8254.28 88.830 17.250 4172.48 4244.38 3970.76 N 4846.82 E 6004058.14 N 570888.43 E 3,115 5915.57 8302.15 87.160 15,320 4174,15 4246,05 4016.68 N 4860.23 E 6004104.17 N 570901.44 E 5.330 5961.74 8353.97 87.600 16.070 4176.52 4248.42 4066.51 N 4874.24 E 6004154.13 N 570915.00 E 1,677 6011,57 8398.35 87.230 13,900 4178.52 4250.42 4109.34 N 4885,70 E 6004197,05 N 570926,08 E 4,955 6054.09 8448.78 88.950 16.410 4180.21 4252.11 4157.98 N 4898.88 E 6004245,81 N 570938.83 E 6.031 6102.46 . 8494.82 88.890 16.330 4181.07 4252.97 4202.15 N 4911.85 E 6004290.09 N 570951.41 E 0.217 6146.92 8546,15 89,070 16.820 4181.99 4253.89 4251.34 N 4926.49 E 6004339.41 N 570965,61 E 1.017 6196.52 8590.80 89.320 17.060 4182.61 4254.51 4294.05 N 4939.50 E 6004382.23 N 570978.24 E 0.776 6239.75 8642.22 88,640 15.560 4183.53 4255.43 4343,39 N 4953.94 E 6004431.69 N 570992.25 E 3,202 6289.38 8687.67 88.520 14.180 4184.66 4256.56 4387.30 N 4965,60 E 6004475,71 N 571003,52 E 3.047 6332.93 8736,73 88.950 13.440 4185.74 4257,64 4434.93 N 4977.30 E 6004523.44 N 571014.80 E 1.744 6379,67 8782.59 89.510 14.860 4186.36 4258.26 4479.39 N 4988,51 E 6004568,00 N 571025.62 E 3.328 6423.46 8833.30 89.510 12.080 4186.79 4258,69 4528.70 N 5000.32 E 6004617.41 N 571036.99 E 5.482 6471,69 8878.56 90.180 9.400 4186.91 4258.81 4573.16 N 5008.76 E 6004661.95 N 571045.03 E 6.104 6514,03 8929.67 90,800 5.930 4186.47 4258.37 4623,81 N 5015.57 E 6004712.65 N 571051.40 E 6.897 6560.80 8974,62 90.370 2.810 4186.02 4257.92 4668.62 N 5019.00 E 6004757.49 N 571054.43 E 7.006 6600.82 9026.13 90,680 359.180 4185.54 4257.44 4720,11 N 5019.89 E 6004808,99 N 571054.87 E 7,073 6645.22 9071,29 89,880 355,320 4185.32 4257.22 4765.21 N 5017.73 E 6004854.06 N 571052.30 E 8.729 6682.57 14 November, 2003 - 10:10 Page 2 of 4 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01 L2 PS1 Your Ref: API 500292314171 Job No. AKZZ0002714264, Surveyed: 18 October, 2003 SP EXPLORATION (ALASKA) INC. SPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (O/100ft) 9121.70 88.150 348.490 4186.19 4258.09 4815.08 N 5010.63 E 6004903.87 N 571044.77 E 13.974 6721.43 9168.28 88.460 344.130 4187,57 4259.47 4860,30 N 4999.62 E 6004949.00 N 571033.35 E 9.380 6754,27 9218.34 89.200 345.280 4188.59 4260.49 4908.58 N 4986.41 E 6004997,15 N 571019.72 E 2.731 6788.58 9264.27 89.260 342.640 4189.21 4261,11 4952.71 N 4973,73 E 6005041.17 N 571006.64 E 5.749 6819.62 . 9314.11 89.140 338.490 4189.90 4261,80 4999.70 N 4957.15 E 6005088.01 N 570989.65 E 8,329 6851.07 9359.86 88,890 336.900 4190.69 4262.59 5042.02 N 4939.79 E 6005130.17 N 570971.92 E 3.518 6878.13 9410.19 90.800 334.420 4190.83 4262.73 5087.87 N 4919.05 E 6005175.84 N 570950.77 E 6,219 6906.43 9455.90 90.190 334.250 4190.43 4262.33 5129.07 N 4899,25 E 6005216.86 N 570930.61 E 1.385 6931.26 9506.09 92.530 332.500 4189.24 4261 .14 5173.92 N 4876.77 E 6005261.51 N 570907.73 E 5,821 6957.81 9551.78 93.330 332.900 4186.91 4258.81 5214.46 N 4855.84 E 6005301.87 N 570886.44 E 1,957 6981.50 9602.91 92.530 329.430 4184.29 4256.19 5259,19 N 4831.21 E 6005346.38 N 570861.43 E 6,956 7006.82 9648.48 91.360 325.630 4182.74 4254.64 5297.61 N 4806.77 E 6005384.57 N 570836.64 E 8.720 7026.85 9699.04 90.490 321,920 4181.93 4253.83 5338.38 N 4776.90 E 6005425,08 N 570806.41 E 7.536 7046,07 9744,59 90.430 321.420 4181.56 4253.46 5374.11 N 4748.65 E 6005460,56 N 570777.85 E 1.106 7061.82 9795.43 90.370 321,000 4181,21 4253.11 5413.74 N 4716.80 E 6005499.90 N 570745.65 E 0.834 7079.03 9840.20 89.690 320.690 4181.18 4253.08 5448.45 N 4688.53 E 6005534.37 N 570717,08 E 1.669 7093.91 9890.72 91.110 322,290 4180.83 4252.73 5487.98 N 4657,08 E 6005573.62 N 570685.27 E 4,234 7111.24 9936.16 90.430 322.130 4180.22 4252.12 5523.89 N 4629.24 E 6005609.28 N 570657,12 E 1.537 7127.36 9986.86 92.710 322.190 4178.83 4250.73 5563.91 N 4598,15 E 6005649.02 N 570625.67 E 4.499 7145.29 10032.84 92.340 322.640 4176.81 4248,71 5600,31 N 4570.13 E 6005685.17 N 570597.34 E 1.266 7161.74 10083.34 92.650 322.710 4174.61 4246.51 5640.43 N 4539.54 E 6005725.02 N 570566,39 E 0.629 7180.03 . 10129.21. 92.100 322.390 4172.71 4244.61 5676.81 N 4511.67 E 6005761.16 N 570538.20 E 1.387 7196.54 10179.95 94.200 322.540 4169.92 4241.82 5716.99 N 4480.81 E 6005801.05 N 570506,98 E 4.149 7214.72 10225,56 93.580 322.230 4166.82 4238.72 5753.03 N 4453.03 E 6005836.85 N 570478.89 E 1.519 7231.00 10276.59 96,300 321.830 4162.43 4234.33 5793.11 N 4421,76 E 6005876.65 N 570447.26 E 5.387 7248.88 10323.02 95.800 320.680 4157.54 4229.44 5829.12 N 4392.86 E 6005912.40 N 570418.05 E 2.688 7264.54 10393,00 95.800 320.680 4150.46 4222.36 5882.98 N 4348.75 E 6005965.87 N 570373.46 E 0.000 7287.50 Projected Survey All data is in Feet (US Survey) unless otherwise stated, Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 31.430° (True). Magnetic Declination at Surface is 25.170° (12-0ct-03) 14 November, 2003 - 10:10 Page 3 of 4 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01 L2 PB1 Your Ref: API 500292314171 Job No. AKZZ0002714264, Surveyed: 18 October, 2003 BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA Based upon Minimum Curvature type calculations, at a Measured Depth of 10393.00ft., The Bottom Hole Displacement is 7315.81ft., in the Direction of 36.472° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment . 7421.36 7487.00 10393.00 4188.27 4222.00 4222.36 3279.15 N 3324.16 N 5882.98 N 4429.47 E 4463.31 E 4348.75 E Tie On Point Window Point Projected Survey Survey tool program for MPS-01/? PB1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 245.00 0.00 245,00 244.99 10393.00 244.99 AK-1 BP _HG (MPS-01 PB1 Gyro) 4222.36 AK-6 BP _IFR-AK (MPS-01 PB1) . 14 November, 2003 - 10:10 Page 4 of 4 DrillQuest 3.03.05.005 . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . @.03 -/ &f 15-Nov-03 Re: Distribution of Survey Data for Well MPS-01 L2 PB1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey Projected Survey: 7,241.36' MD 7,487.00' MD 10,393.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager AUachment(s) ~~\\\'~ ~%¡r.·;;r~E· . 'VED ,,\11-"'-' I DEC 08 2003 Ala5ka on &. Gas Cons. commiØ}n Anchor~e Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPS MPS-01L2 PB1 MWD . Job No. AKMW0002714264, Surveyed: 18 October, 2003 Survey Report 14 November, 2003 Your Ref: API 500292314171 Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 . Surface Coordinates relative to Project H Reference: 1000044.65 N, 66076.93 E (Grid) Surface Coordinates relative to Structure: 72.02 N, 267.44 W (True) Kelly Bushing Elevation: 71.90ft above Mean Sea Level Kelly Bushing Elevation: 71.90ft above Project V Reference Kelly Bushing Elevation: 71.90ft above Structure Sp:E!i'i'Y-SUI'1 DRIL.L.ING'SERVlces A Halliburton Company Survey Ref: svy1299 Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01 L2 PB1 MWD Your Ref: API 500292314171 Job No. AKMW0002714264, Surveyed: 18 October, 2003 BP EXPLORA TION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 7421.36 58.440 35,930 4116.48 4188.38 3290.99 N 4418.92 E 6003374.61 N 570466.56 E 5112.40 Tie On Point 7487.00 59.720 36.460 4150.20 4222.10 3336.43 N 4452.17 E 6003420.34 N 570499.41 E 2.069 5168.52 Window Point 7533.37 66.810 36.950 4171.05 4242.95 3369.61 N 4476.91 E 6003453.74 N 570523,86 E 15.319 5209.73 7584.18 77.510 34.790 4186.60 4258.50 3408.76 N 4505.19 E 6003493.14 N 570551,78 E 21.443 5257,88 7630.32 87.590 38.090 4192,57 4264.47 3445.50 N 4532.34 E 6003530.12 N 570578.61 E 22,966 5303.39 . 7678.19 95.000 39.090 4191.49 4263.39 3482.89 N 4562.17 E 6003567.76 N 570608.10 E 15.619 5350.84 7726.98 94.130 39.390 4187.61 4259.51 3520.55 N 4592,93 E 6003605.70 N 570638.53 E 1.886 5399.02 7776.70 95.930 35.270 4183.25 4255.15 3559.92 N 4622,96 E 6003645,34 N 570668.21 E 9.013 5448.28 7823.69 95.870 37.000 4178.42 4250.32 3597.67 N 4650.52 E 6003683,33 N 570695.44 E 3.664 5494.86 7874.10 91.730 33,280 4175.08 4246,98 3638,79 N 4679.46 E 6003724.70 N 570724.01 E 11.029 5545.03 7920.05 91.910 33.050 4173.62 4245.52 3677.24 N 4704.58 E 6003763,36 N 570748.79 E 0.635 5590.94 7967.12 91.600 31.800 4172.18 4244,08 3716.95 N 4729.81 E 6003803,30 N 570773.67 E 2.735 5637.98 8016.01 90.190 27.670 4171.41 4243.31 3759.39 N 4754.05 E 6003845.95 N 570797,53 E 8.925 5686.83 8064.17 90.560 26.040 4171.10 4243.00 3802.35 N 4775.80 E 6003889,10 N 570818.90 E 3.471 5734.83 8113.05 89.080 20.600 4171.25 4243.15 3847.22 N 4795.14 E 6003934.14 N 570837,85 E 11 .533 5783.20 8161,58 89.570 18,430 4171.82 4243.72 3892,95 N 4811.35 E 6003980.02 N 570853,65 E 4.584 5830,68 8205.00 89.880 19.280 4172.03 4243.93 3934.04 N 4825.38 E 6004021.23 N 570867,32 E 2,084 5873.06 8254,28 88.830 17,930 4172.58 4244.48 3980.74 N 4841.11 E 6004068.07 N 570882,63 E 3.470 5921,11 8302.15 87.160 16,350 4174.26 4246.16 4026.46 N 4855.20 E 6004113.90 N 570896.32 E 4.801 5967.46 8353,97 87.600 16.740 4176.63 4248.53 4076.08 N 4869.95 E 6004163.65 N 570910.62 E 1,134 6017.49 8398.35 87.230 13.940 4178.63 4250.53 4118.83 N 4881.67 E 6004206.51 N 570921.97 E 6,358 6060.09 . 8448.78 88.950 16,880 4180.31 4252.21 4167.41 N 4895.06 E 6004255.21 N 570934.93 E 6.751 6108,52 8494.82 88.890 16,180 4181.18 4253.08 4211.54 N 4908.16 E 6004299.45 N 570947,64 E 1,526 6153.01 8546.15 89.070 17,360 4182.09 4253.99 4260.68 N 4922.97 E 6004348.72 N 570962.01 E 2.325 6202.66 8590.80 89,320 17.390 4182,72 4254.62 4303.29 N 4936.30 E 6004391.44 N 570974.97 E 0.564 6245.97 8642.22 88,640 15.860 4183.64 4255.54 4352,55 N 4951,01 E 6004440.83 N 570989.24 E 3.256 6295.67 8687.67 88.520 14.350 4184.76 4256.66 4396.41 N 4962,85 E 6004484,80 N 571000,69 E 3.332 6339.27 8736.73 88,950 13.530 4185.85 4257.75 4444.02 N 4974,67 E 6004532.50 N 571012.08 E 1.887 6386.05 8782.59 89.510 14,310 4186.46 4258.36 4488.52 N 4985,70 E 6004577.11 N 571022.72 E 2.094 6429.78 8833.30 89.510 12,390 4186.90 4258.80 4537.86 N 4997.40 E 6004626.55 N 571033.99 E 3.786 6477.99 8878,56 90.180 9.770 4187.02 4258.92 4582.27 N 5006.10 E 6004671,03 N 571042.30 E 5.975 6520.42 8929.67 90.800 6.530 4186.58 4258.48 4632.86 N 5013.35 E 6004721.68 N 571049.09 E 6.454 6567.36 8974,62 90.370 3.060 4186.12 4258.02 4677.64 N 5017.10 E 6004766.49 N 571052.45 E 7,778 6607.53 9026.13 90.680 359,510 4185.65 4257.55 4729.13 N 5018.26 E 6004817,99 N 571053.15 E 6.918 6652.06 9071.29 89.880 355.890 4185.43 4257.33 4774.24 N 5016.45 E 6004863.09 N 571050.94 E 8.209 6689.61 14 November, 2003 - 10:12 Page 2 of 4 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01 L2 PB1 MWD Your Ref: API 500292314171 Job No. AKMW0002714264, Surveyed: 18 October, 2003 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 9121.70 88.150 349.280 4186.30 4258.20 4824.19 N 5009.95 E 6004912.98 N 571044.00 E 13.552 6728.85 9168.28 88.460 344.800 4187.67 4259.57 4869.56 N 4999.51 E 6004958.25 N 571033.16 E 9.637 6762.11 9218.34 89.200 345,790 4188.70 4260.60 4917.97 N 4986.80 E 6005006.54 N 571020,03 E 2.469 6796,79 9264.27 89.260 343,190 4189.31 4261.21 4962.21 N 4974.52 E 6005050,68 N 571007.36 E 5.662 6828,15 9314.11 89.140 339.280 4190.01 4261.91 5009.39 N 4958.49 E 6005097.71 N 570990.91 E 7,848 6860.04 . 9359,86 88,890 337.880 4190.80 4262.70 5051.97 N 4941.79 E 6005140.15 N 570973.83 E 3.108 6887.67 9410.19 90.800 335.000 4190.93 4262.83 5098.10 N 4921,67 E 6005186,10 N 570953.31 E 6,866 6916.54 9455.90 90.190 335.020 4190.54 4262.44 5139.53 N 4902.36 E 6005227.35 N 570933.63 E 1.335 6941.82 9506.09 92.530 333.670 4189.35 4261.25 5184.76 N 4880.64 E 6005272.38 N 570911.51 E 5,382 6969.08 9551.78 93.330 333.990 4187.01 4258.91 5225.71 N 4860.52 E 6005313.16 N 570891.03 E 1.885 6993.53 9602.91 92.530 330.420 4184.40 4256.30 5270.87 N 4836.71 E 6005358.11 N 570866.82 E 7.146 7019.65 9648.48 91.360 326,810 4182,85 4254.75 5309.74 N 4813.00 E 6005396.77 N 570842.76 E 8.323 7040.46 9699.04 90.490 322.990 4182.03 4253.93 5351.10 N 4783.93 E 6005437.86 N 570813.33 E 7.748 7060.59 9744,59 90.430 322.660 4181.67 4253.57 5387.39 N 4756.41 E 6005473.91 N 570785.49 E 0.736 7077,20 9795.43 90.370 321.970 4181.31 4253.21 5427.62 N 4725.33 E 6005513.87 N 570754.06 E 1,362 7095,33 9840.20 89.690 322.510 4181.29 4253.19 5463.02 N 4697.92 E 6005549.02 N 570726.33 E 1,940 7111,23 9890.72 91.110 323.450 4180.94 4252.84 5503.35 N 4667.50 E 6005589.08 N 570695.56 E 3.371 7129.79 9936.16 90.430 323.420 4180.33 4252.23 5539.84 N 4640.43 E 6005625.33 N 570668,17 E 1 .498 7146,81 9986.86 92.710 323.300 4178.94 4250.84 5580.51 N 4610.19 E 6005665.73 N 570637.57 E 4.503 7165.74 10032.84 92.340 324.030 4176.91 4248.81 5617.51 N 4582.97 E 6005702.49 N 570610,03 E 1.779 7183.12 10083.34 92.650 323.390 4174.71 4246.61 5658.18 N 4553.11 E 6005742.89 N 570579,81 E 1 .407 7202.25 . 10129,21 92.100 323.410 4172.81 4244.71 5694.97 N 4525.79 E 6005779.44 N 570552.16 E 1.200 7219.39 10179,95 94.200 323.800 4170.02 4241.92 5735.75 N 4495.73 E 6005819.95 N 570521.74 E 4.209 7238.51 10225.56 93.580 322.670 4166.93 4238.83 5772.20 N 4468.49 E 6005856,16 N 570494,18 E 2.821 7255.42 10276.59 96.300 322.120 4162.54 4234.44 5812.48 N 4437.47 E 6005896.16 N 570462.80 E 5.437 7273.61 10323.02 95.800 321.450 4157.64 4229,54 5848.75 N 4408.91 E 6005932.18 N 570433.92 E 1.794 7289.67 10393.00 95,800 321.450 4150.57 4222.47 5903.20 N 4365.52 E 6005986.24 N 570390.05 E 0,000 7313,50 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 31.430° (True). Magnetic Declination at Surface is 25.170° (12-0ct-03) 14 November, 2003 - 10:12 Page 3 of 4 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPS - MPS-01 L2 PB1 MWD Your Ref: API 500292314171 Job No. AKMW0002714264, Surveyed: 18 October, 2003 BP EXPLORA nON (ALASKA) INC. Milne Point Unit BPXA Based upon Minimum Curvature type calculations, at a Measured Depth of 10393,00fl., The Bottom Hole Displacement is 7342.04f1., in the Direction of 36.484° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment . 7421.36 7487.00 10393.00 4188.38 4222,10 4222.47 3290.99 N 3336.43 N 5903.20 N 4418.92 E 4452.17 E 4365,52 E Tie On Point Window Point Projected Survey Survey tool program for MPS-011? PR1 MWD Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 245.00 0.00 245.00 244,99 10393.00 244.99 AK-1 BP _HG (MPS-01 PB1 Gyro) 4222.47 MWD Magnetic (MPS-01 PB1 MWD) . 14 November, 2003 - 10:12 Page 4 of 4 DrillQuest 3.03.05.005 ~ . . c"" t fl1ì 1: ® ~ ® C~ - ~ /Æ / FRANK H. MURKOWSKJ, GOVERNOR _ _ lill J lnL=olnJ@ - . / .AI,ASIiA OIL AlQ) GAS / CONSERVATION COMMISSION / 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519-6612 Re: Milne Point Unit S-01L2 BP Exploration (Alaska), Inc. Permit No: 203-169 Surface Location: 3375' NSL, 4714' WEL, Sec. 07, T12N, RIlE, UM Bottomhole Location: 4525' NSL, 757' WEL, Sec. 06, T12N, RIlE, UM Dear Mr. Archey: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well MPU S-O 1, Permit No 203-034, API 50-029-23141-00. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~j~ Commissioner BY ORDER J}F THE COMMISSION DATED thisL day of October, 2003 cc: Department ofFish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. Exploration, Production and Refineries Section .. STATE OF ALASKA_ ALASKA ~AND GAS CONSERVATION CO~SION PERMIT TO DRILL 20 MC 25.005 1b. Current Well Class 0 Exploratory o Stratigraphic Test 0 Service 5. Bond: 181 Blanket 0 Single Well Bond No. 2S100302630-277 6. Proposed Depth: MD 11115' . TVD 4145' 7. Property Designation: ADL 380110 o Drill II Redrill 1 a, Type of work 0 Re-Entry 2, Operator Name: BP Exploration (Alaska) Inc, 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 3375' NSL, 4714' WEL, SEC. 07, T12N, R11 E, UM . Top of Productive Horizon: 3981' NSL, 329' WEL, SEC, 06, T12N, R11E, UM' Total Depth: 4525' NSL, 757' WEL, SEC, 06, T12N, R11E, UM' 4b. Location of Well (State Base Plane Coordinates): Surface: X-566077 ' y-6000045' Zone;A.SP4 16. Deviated Wells: Kickoff Depth 7487' ft Maximum Hole Angle Grade CouplinQ Length MD TVD MD TVD (including stage data) L-80 BTC 3778' 7337' 4075' 11115' 4145' Uncemented Slotted Liner Hole 6-1/8" CasinQ 4-1/2" Weight 12.6# ~(O(~ II Development Oil D,Multiple Zone o Development Gas 17Single Zone.Jb 11. Well Name and Number: MPS-01L2 12. Field I Pool(s): Milne Point Unit I Schrader Bluff 8. Land Use Permit: 13. Approximate Spud Date: 10/10103 14, Distance to Nearest Property: 4920' 9. Acres in Property: 2560 90° 10. KB Elevation KBE = 15. Distance to Nearest Well Within Pool (Height above GL): 72,50' feet 1270' away from MPS-07 17. Anticipated pressure (see 20 MC 25,035) Max. Downhole Pressure: 1801' psig. Max. Surface Pressure: 1379' psig P6E;SE¡..¡,..WELL CONDITION.SI.)M~lN6~(TQbe.çompl~tø~fòfReârill AND R~øntryQperation$) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): I Effective Depth MD (ft): Depth TVD (ft):1 10530(OA), 10515 (OB) 4410 (OA), 4462 (OS) NIA 10530(OA), 10515 (OS) 4410 (OA), 4462 (OS) Structural Conductor 78' 20" 260 sx Arctic Set (Approx.) 112' 112' Surface 3105' 10-3/4" 946 sx PF 'L', 275 sx Class 'G' 3140' 2375' Intermediate Production 8136' 7-5/8" 160 sx PF 'E', 293 sx Class 'G' 7685' (OA), 8139' (OS) 4303' (OA), 3585' (OS) Liner 2580' 4-1/2" Uncemented Slotted Liner 7663' - 10243' (OA) 4296' - 4388' (OA) Liner (OB) 2629' 4-1/2" Uncemented Slotted Liner 7885' -10514' (OS) 3522' - 4198' (OS) Perforation Depth MD (ft): 4-1/2" Slotted Liner IPerfOration Depth TVD (ft): 4-1/2" Slotted Liner 7748' - 10200' (OA), 8818' - 10512' (OB) 4317' - 4386' (OA), 4375' - 4462' (OB) 20. Attachments 181 Filing Fee 0 BOP Sketch 181 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis o Property Plat 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 18120 MC 25.050 Requirements 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Pat Archey Title Senior Drilling Engineer I~Çt"ciy Permit To Drill . I API Number: Number: ,2.D~-/~'1 50-029-23141-61-00 Conditions of Approval: Samples Required Hydrogen Sulfide Measures Other: :,SOO~~\ ßCJ"?~, .,.111__ By ~~iLI" Approved By: Form 10-401 Revised 3/2003 Date: Contact Walter Quay, 564-4178 Prepared By Name/Number: Date IOj'o7jo-S Sondra Stewman, 564-4750 Phone 564-5803 Commission Use Only 16:~~it AP1rozry q ) 0 , Mud Log Required Directional Survey Required I See cover letter for other requirements mes ~o ~Y:s DNa '7 I DYes -KNo DYes .~No o R \c~l~,ßk BY ORDER OF THE COMMISSION Datestºc9~t -- _ilne Point MPS-01 L2 Well Permit IWell Name: I MPS-01 L2 Drill and Complete Plan Summary I Type of Well (service I producer I injector): I Multi Lateral Producer NE Surface Location: 1904' FNL, (3375' FSL),' 4714' FEL; (67' FWL), SEC. 7, T12N, R11 E - E=566076.93 N=6000044.65 Target Location: 3303' FNL, (5140' FSL), 5140' FEL, (140' FWL), SEC. 5, T12N, R11 E T1 E=570880 N=6003970 Z=4220'TVD Target Location: 1908' FNL, (3372' FSL), 5132' FEL, (148' FWL), SEC. 5, T12N, R11E T2 E=570870 N=6005365 Z=4190' TVD Target Location: 1299' FNL, (3981' FSL), 329' FEL: (4427' FWL), SEC. 6, T12N, R11 E / T3 E=570385 N=6005970 Z=4170' TVD Target Location: 755' FNL, (4525' FSL),'757' FEL; (3997' FWL), SEC. 6, T12N, R11 E "" BHL "NE" Well TD E=569950 N=6006510 Z=4145' TVD Distance to Property Line 4920' Distance to Nearest Pool 1270' I MPS-07 ./ I AFE Number: 1 TBD I Rig: I Doyon 14 1 I Estimated Start Date: 110 Oct 2003 I Operating days to complete: 17 1 IMD:111,1151" I TVD: 14145' 1 IMaxlnc: 190 1 I KOP: 17487'1 IKBE: 172.51 1 Well Design (conventional, slimhole, etc.): I Add ML Producer Leg I I Objective: I Schrader Bluff NE Sand / 1 Mud Program: 6.125-in Production Hole Mud Properties: KCI-CaC03 floPro Density (ppg) PV YP HTHP pH I API Filtrate I MBT 9.5 10 - 20 25 - 30 10 - 11 9.0 - 9.5 < 6 < 7 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation ,¡ Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR. Cement Program: Casing Size 4-1/2" Basis Slotted Liner - No Cementing Total Cement Wash NA Spacer Lead Tail Temp 1 e Evaluation Program: 6.125-in Hole section: Open Hole: MWD/GRlRES, ASI, PWD / IFRlCASANDRA Cased Hole: N/ A Formation Markers Formation Tops Base Permafrost TUZC NA NB NC NE NF * Based on SS depths MDrkb (ft) TVDrkb (ft) 1822 3694 4158 4180 4207 4220 4277 Pore Pressure (psi) 760 1573 1683 1774 1784 1795 1801 / Casin~JTubing Program Hole Size Csg / Wt/Ft Grade Conn Tbg Q,D, 6.125-in 4.5-in 12.6# L-80 BTC NE Slotted _ilne Point MPS-01 L2 Well Permit Estimated EMW (Ib/gal)* 8.35 8.35 8.35 8.35 8.35 8.35 8.35 ./ Length Top Bottom MD / rvDrkb MD / rvDrkb 3,778' 7,337' /4075,' 11,115' /4,145' 2 Recommended Bit Program BHA Hole Size Depth (MD) Bit Type Nozzle/Flow rate 3 6.125-in 7,487' - TD Security FM2643 3-12 e _ilne Point MPS-01 L2 Well Permit Well Control: Intermediate hole: · Maximum anticipated BHP: · Maximum surface pressure: 1 ,801-psi @ 4,222-ft TVDrkb - Top of "NE" 1 ,379":psi @ surface (Based on BHP and a full column of gas from TD @ 0.1-psi/ft) 3,500-psi. An FIT to 11.0-lb/gal will be made on the 7-5/8" Window Infinite with 9.5-lb/gal mud. 9.8-lb/gal brine I 7.0-lb/gal Diesel (1 ,800-ft MD). · Planned BOP test pressure: · Integrity test: . Kick tolerance: · Planned completion fluid: Drilling Hazards & Contingencies: Lost Circulation ./ . We do not expect losses while drilling this well. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (8.35 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.5-lb/gal mud. ~ Pad Data Sheet · Please Read the S-Pad Data Sheet thoroughly. Breathing . N/A Hydrocarbons / · Hydrocarbons will be encountered in the NA through the Schrader Bluff. Faults · Fault #1 , a 10 - 20' DTS is expected at 7490' MD · Fault #2, a 5 - 10' DTN fault is expected at 8400' MD · Fault #3, a 5 - 10' DTN fault is expected at 8700' MD · Fault #4, a 5 - 10' DTS fault is expected at 9350' MD · Fault #5, a 10 - 20' DTN fault is expected at 9900' MD Hydrogen Sulfide · MPS Pad is not designated as an H2S Pad. ./ Anti-collision Issues · MPS-01 L-2 has no anti-collision issues, other than the main wellbore of MPS-01 and MPS-01 L 1. 3 e eilne Point MPS-01 L2 Well Permit DRILL & COMPLETION PROCEDURE Pre-Riq 1. E-line chemical-cut Premier Packer. 2. Set plug in XN profile in Sliding sleeve (2nd barrier) Baker 4.5-in Premier Packer Data · 6.52-ft length · 46.74-in (3.90-ft) from top of box connection to top of cutting zone · 21.4-in (1.78-ft) cutting zone 3. 0.355-in thickness of cut required to release packer Pull Completion 1. MIRU Doyon 14. 2. Nipple down tree. 3. Nipple up 13-5/8" 5M BOPE on 11" 5M casing head. Test annular to 250-psi low and 2,500-psi high, test rams and associated equipment to 250-psi low and 3,500-psi high. 4. Pull BPV, 5. Pull Plug from nipple 6. Displace out produced water and freeze protect fluid with sea water through annulus valve to tank or truck. 7. Pull and LD tubing hanger and space-out pups. · Inspect power fluid impingement zone on tubing immediately below hanger. · Inspect tubing for wear as it is pulled (high solids during production). 8. Pull 4.5-in tubing (use 208-k.lbf joint yield strength with 20% safety factor for 166-k.lbf maximum over-pull) and stand in derrick to be re-run. · See attached contingency plan if tubing does not pull. · Have Schlumberger e-line on standby before beginning to pull tubing. . Remove I-wire clamps and spool I-wire. 9. LD Packer, Phoenix pressure gauges and sliding sleeve. 10. PU 6.75-in bit, scraper and magnets and RI H on 4.0-in drill pipe to 7,550-ft. Do not circulate or rotate. 11. POH. 4 e eilne Point MPS-01 L2 Well Permit RUN WHIPSTOCK 12. Run and set packer. 13. Pick-up Baker whipstock with MWD for orientation. Orient and set the whipstock BTM anchor and shear off disconnect as per BOT 14. Mill window (estimated to be 13.5'), CCM, Pull out of hole and LD mills DRILL PRODUCTION HOLE 15. Drill 6-1/8" horizontal lateral as per directional program. / PULL WHIPSTOCK 16. Circulate and condition the hole until shakers indicate the hole is clean. POH and lay down BHA Retrieve whipstock RUN PRODUCTION LINER 17. Rig up and run 4-1/2" 12.6# slotted liner with Hookwall hanger system 18. Pull out of hole and lay down liner running tool 19. Run in hole with mule shoe guide. Displace floPro with seawater followed by 9.2-lb/gal NaCI with corrosion inhibitor. POH and lay down excess drill pipe RUN PRODUCTION TUBING 20. Rig up and run 4-1/2" completion. 21. Install BPV and nipple down the BOPE 22. Nipple up the adapter flange and tree, pull BPV and install TWC. Test tree, Pull TWC. 23. Drop the ball and rod, allow it to gravitate onto the ball seat. 24. Pressure tubing to set the slips, then increase pressure to set the element. 25. Pressure Test tubing. 26. Pressure test the casing and packer (4-1/2" x 7-5/8") annulus. RIG DOWN AND RELEASE RIG 27. Shear RP valve in the GLM. 28. freeze protect with diesel. 29. Install BPV and test from below. 30. Secure the well and release the rig 5 Iœg;, 4-1/16" - SM FMC _ Wellhead: 11" x 4.S" SM Gen. w/4.S" TCII T&B Tubing Hanger 4" CIW "H" BPV profile I MPS-01~LI L 20" x 34" insulated, 215 #/ft A-53 ~ 103/4" 45,5 ppf L-80 BTRC (Drift ID = 9,794, cap. = .0961 bpf) 103/4" Super Seal II Float Shoe I 3140' I ~ 7518" 29.7 ppf, L-80, BTRC-mod production casing (drift ID = 6,750", cap. = 0,0459 bpf) 4.5",12.6#, L-80 IBTtbg. (cap. = .0152 bpf, id =3.958) 3,5",9.2# L-80 NSCTtbg, ( cap, = ,0087 bpf, id 2.992 ) Reservoir Fluid Window in 7 -S/8" Casing @ 768S' - 7697' Well Angle @ window = 73° on.elev. = 72.50' (Doyon 14) Ori ,elev,= 38.30' (Doyon 14) Cameo 4.5" x 1" w/ BK-5 latch sidepocket KG B-2 GLM ... KOP @ 400' 53+ degree from 1950' Max hole angle = 68 degree @ 5060' 58 degree @ Sleeve 4.S" x 3.S" X-Over @ 748S' No-Go ID of XN nipple 2.7S0" @ 7548' Phoenix Discharge gauge (3.850 ID) 4.5" HES XD Dura sliding sleeve NOTE: ID change min. 2.840" Phoenix gauge ( 2.840" ID) (4060' TVD) 4.5" x 3,5" X-Over 3,5 HES X-Nipple (2,813 ID) 7-5/8" x 3.5" Baker Premier Packer 3.5" HES XN-Nipple (2.813 packing bore 2.750" No Go ID) WLEG Baker Tie Back Sleeve 7662' Baker Hook Wall Hanger inside 7" Window 7671' ~-- Hanger outside 7-5/8" Window 7697' 61/8" Hole td @ 10,530' 66 jts. - 4 1/2" R3 Slotted Liner 12,6# L-80 IBT (7,747'-10,199') OA Upper Lateral Baker Tie Back Sleeve 7885' Baker ZXP Liner Top Packer 7,892' Baker 7-5/8" x 5" HMC Liner Hanger 7 ,898' ~ ~ 75/8" Halliburton Float Collar 8054' 7518" Halliburton Float Shoe 8139' r~~\~~»l Btm Baker 4 1/2" Guide Shoe 10,243' ~ ~ 61/8" Hole td @ 10,515' ~ OB Lower Lateral 60 jts. - 41/2",12.6# L-80, IBT Slotted Liner (8,117'-10,512') DATE REV, BY COMMENTS 04/16/03 MDO Drilled & Completed Doyon 14 Blm Baker 41/2" "V" Float Shoe 10,514' I 2106' I I 7437' 1 17,448' I 17,471'1 17,48S' I I 7,487' I I 7,498' I 17,s48' I 17,ss4' I . Rat Hole 287' f MILNE POINT UNIT WELL 5-01 API NO: 50-029-23141-60 L1 API NO: 50-029-23141-00 BP EXPLORATION (AK) . Iœ.e.;, 4-1/16" - 5M FMC _ Wellhead: 11" x 4.5" 5M Gen _ M PS-01 L2 Proposed wI 4.5" TCII T&B Tubing Hanger 4" CIW "H" SPV profile 20" x 34" insulated, 215 #/ft A-53 oJ 103/4" 45,5 ppl L·80 BTRC (Drift ID = 9,794, cap. = .0961 bpI) ... I 3140' I 103/4" Super Seal II Float Shoe 7 5/8" 29.7 ppl, L-80, BTRC-mod production casing ( drift ID = 6,750", cap. = 0.0459 bpI) 4,5",12.6#, L-80 IBTtbg. ( cap. = .0152 bpI, id =3.958 ) 3.5", 9.2# L·80 NSCT tbg, ( cap. = .0087 bpI, id 2.992 ) Baker Hook Wall Hanger outside 7·5/8" Window 7499' Window in 7-5/8" Casing @ -7,487' - 7,499' Well Angle @ window = 59° Baker SC1-R Packer at +1-7,505' MD 3·1/2" Tailpipe 3-1/2" XN Nipple at +1- 7525' WLEG at +1- 7535' Window in 7-5/8" Casing @ 7685' - 7697' I Well Angle @ window = 73° Baker Tie Back Sleeve 7885' Baker ZXP Liner Top Packer 7,892' Baker 7-518" x 5' HMC Liner Hanger 7,89~ 7 5/8" Halliburton Float Collar 8054' 75/8" Halliburton Float Shoe 8139' DATE REV. BY COMMENTS 1 0106/03 WDa L2 Proposed I NE Lateral ~"Ifr"... I~· r OrigAelev. = 72,50' (Doyon 14) Orig_ elev.= 38.30' (Doyon 14) L Cameo 4.5" x 1" wI BK-5latch side pocket KG B-2 GLM .. KOP @ 400' 53+ degree from 1950' Max hole angle = 68 degree @ 5060' 58 degree @ Sleeve 4.5" x 3.5" X-Over @ 7270' No-Go ID of XN nipple 2.750" @ 7331' Phoenix Discharge gauge (3.850 ID) 4.5" HES XD Dura sliding sleeve NOTE: ID change min. 2.840" Phoenix gauge (2.840"ID) (4060' TVD) 4.5· x 3.5" X-Over 3.5 HES X-Nipple (2.813ID) 7-518" x 3.5" Baker Premier Packer 3.5" HES XN-Nipple (2.813 packing bore 2.750" No Go ID) BakerTie Back Sleeve 7,337' WLEG ~ r- 6118" Hole td @ 11,115' 66 its. - 4 1/2" R3 Slotted Liner " 12.6# L-80 IBT (7,487'-11 ,115') Baker Hook Wall Hanger outside 7-5/8" Window 7697' 61/8" Hole td @ 10,530' OA Upper Lateral V\'}. S\S~1 ~ ~ 66 its. - 4 1/2" R3 Slotted Liner 12.6# L-80 IBT (7,747'-10,199') 8tm Baker 4 tl2' Guide Shoe to,243' 61/8" Hole td @ 10,515' 60 its. - 41/2", 12.6# L-80, 113 1 ~ ~......~ 08 Lower Lateral ,-.. _. Slotted Liner (8,117'- 10,512') 81m Baker 4112" -V" Float Shoe 10,514' 12106' I 1 7,219'1 17,230'1 7,253' I 7,267' I 7,269'1 7,281'1 7,331'1 7,337' 1 . . Rat Hole 287' f MILNE POINT UNIT WELL 5-01 API NO: 50-029-23141-60 L1 API NO: 50-029-23141-00 BP EXPLORATION (AK) MPS-01 L2 T4 Total Depth: 11114.73ftMD,4217.50ftTVD 4217,50 TVD 18D3 4 1I2i1 Liler fQ 11114.73nMD 6430.83 N, 3930.12 E \I'~ 4217,50nTVD Ý ~ 132.44 ofo End Dir, Start Sail @ 92.065° : 10420.86ftMD,4242.50ftTVD -......-'1 ·!:I-1IUl I BPXA e CfIIlLl,í"UiI !I..IIf.f!Vre1InJ MOl Po t U 't .__... I ne om m Scale: 1 inch = 750ft 3750 I .. !' ~..,.. ... '. ., :;.:" .._~"... ..-.'.__.... ~,; "=;' Begin Dir @ 6.000°/1000: 10410.75ft MD, 4242.81ft TVD End Dir, Start Sail @ 91.474° : 9645.30ftMD,4262.50ftTVD WeD: Current Well Properties MPS-OI Horizontal Coordinates: Ref. Gbbal Coordinates: Ref, Structure: Ref, Geographical Coordinates: RKB Elevation: 6000044,65 N, 566076,93 E 72.02 N, 267,44 W 70' 24' 38,0075" N, 149" 27' 43.0112' W 72,50ft above Mean Sea Level Begin Dir @ 6,0000/100ft 8717,86ft MD, 4283,600 TVD ~Q ?J~ ~~ ~cff> ~Q' fo~ ,,9' ~, ,'ò ~. <:>(5 ~\" <:>(5 <ò' @o <:l North Reference: True North Units: Feet (US Survey) The "Directional Difficulty Index" for this profile is 6.4 End Dir, Start Sail @ 90.930° : 8178.00ftMD,4292.45ftTVD Begin Dir @ 1 0.000°/1 OOft : 7983.55ft MD, 4291.76ft TVD End Dir, Start Sail @ 89,002°: 7731.02ftMD,4287.36ftTVD Kop TF HS Begin Dir @ 12,0000/100ft: 7487,00ft MD, 4150.81ft TVD ~Q ,~ Ç)'?> ~,~ ~' ~{:> ~~ ~- <:>(5 fo~ .~ . ~ ., ."~ ~'ò ¡§:-' ....~Q' ~\,(5 <:><'f)" <:>(5 <>.>,. ,<¡,. . ,,'" @o or'? ' <j'*" f>j9 ~<::- @o'ó <Q'ð .~ ,ob C:J'ð' ~= h~' ~~ ãig "'-' q-v ~~ ~O~. <j'*"' £; 13 4200 7 "'_<::-ò a.c: v CD;:: C;,; ......... (ij~ .200 t: CD > ~Q ~Q ,\ro~ ~~ ~Oj,. ~r{jJ<¡" ~' ~Q' ~ ~ <:><:>1/$ n.~"5 ,,'ò' 9:>J .ö.' ,,OJ V ~. ~~. <:>(5 o~ ~\" @oOJ <:>(5 ~ ,<:>' ~Vj A'*" @o rt¡.'ð' v '¡." ~<::- ?:?" MPS-01 L2 T1 ~<::- f!Q'ð «,,<:' 4292.50 TVD jQ'ð /8100~ / ~~;~O N, 483761 E870Q~ / 9QOO.~ I 5200 Scale: 1 inch = 400ft I 5600 I 6400 Vertical Section (Well) I 6000 MOPS-OJ OrillQuest 3,03.02.002 -Milne pOint DrillQ. ues{ MPS-01L2 Wp 3 Eastings(Well) 4500 5250 I I 6000 I - 6375 - 5625 ãi :s: - 4875 ~ I:: :c t: o Z - 4125 Ë '" ... II .<: - 3375 ,~ ;,; Cã '-' 00 ~Q ~{:> ~ ~{:; ~ - 'ò" .¡;.- Ç)'<::- ~<¡,. ~(5 ra? ~'V ~. ~ Æ)' ~ ~' "". ~' ~ ,,~~ -# <>.>(5 _1>.,<:>' c,?>'ò rJ'~' ,\J' ~'V .OJ ~. ," ~þ. . .~ _ç.,<0 - ,'f 0\' 'J'" @oOj é5 OJ<¡'' .~ @o roo .~ @o r:- C:J'ð' .,*" C:J'If Total Depth / rt¡.'ð' .~ <J rt¡.<t 11114.73ftMD <j'*"' <Q0\$ -,*"' MP3-01 L2TI217.50ftTVD Ò ~<J 4242.50 TVD 4 112n Liler <v.<:' f~~:,;O~[{vY;' 0 .5887.00 N, 43.60.32 E 11114_73nMD ~')77";1"'ï-/ 4839 QC F 11000.0""" 4217.50nTVD _ ~,.,010400. ,3.ft MPS·01 L2T4 9"'0.~ _ ·°It r.w5-01 L2Wp 3. 4217,50 TVO 6430.83 N, 3930 12 E . I 6800 I \1PS-U!L1 I 7200 7600 Section Azimuth: 31,431° (True North) .......... ..!I-......-, I BPXA · ºfIIIll.....nr,n'!II."'II.~.S M'I P" t U "t ...___.... I ne om m -Milne pOintl DrillQ..uesf MPS-01L2 Wp 3 '~.' - "t- 0:..; .f.~: ....,~} . .. -:~;~" . .:. .,.. ., .--~ ....;¡. - ~.. ,,. ." . -~..- ~æ_~":;":~~· jj¡, ~:- :~~~. ~':"-- -~.:'.:: ~..._~~ .:~.. .,~::? h~; Well: Current Well Properties MPS-01 Horizontal Coordinates: Ref. Global Coordinates : Ref. Structure : Ref. Geographical Coordinates : RKB Elevation: 6000044.65 N, 566076.93 E 72.02 N, 267.44 W 70024' 38.0075" N, 149027' 43.0112" W 72.5011 above Mean Sea Level North Reference: True North Units: Feet (US Survey) The "Directional Difficulty Index" for this profile is 6.4 MPS-01 L2 Wp 3,0 Proposal Data Vertical Origin: Horizontal Origin : Measurement Units : North Reference: Well Well ft True North Dogleg severity: Degrees per 100 feet (US Survey) Vertical Section Azimuth: 31.4310 Vertical Section Description: Well Vertical Section Origin: 0.00 N,O.OO E Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg Depth Depth Section Rate 7487.00 59.719 36.462 4222.29 3323.74 N 4463.00 E 5163.37 7507.00 62.119 36.462 4232.01 3337.80 N 4473.39 E 5180.78 12.000 7731.02 89.002 36.508 4287.36 3510.63 N 4601.21 E 5394.91 12.000 7983.55 89.002 36.508 4291.76 3713.57 N 4751.42 E 5646.40 0.000 8174.25 90.560 17.500 4292.50 3882.70 N 4837.61 E 5835.66 10.000 8178.00 90.930 17.441 4292.45 3886.27 N 4838.73 E 5839.30 10.000 8717.86 90.930 17.441 4283.69 4401.25 N 5000.52 E 6363.08 0.000 9645.20 91.480 321.790 4262.50 5277.74 N 4839.95 E 7027.22 6.000 9645.30 91.474 321.790 4262.50 5277.82 N 4839.89 E 7027.26 6.000 10410.75 91.474 321.790 4242.81 5879.07 N 4366.59 E 7293.48 0.000 10420.86 92.065 321.654 4242.50 5887.00 N 4360.32 E 7296.98 6.000 11114.73 92.065 321.654 4217.50 6430.83 N 3930.12 E 7536.67 0.000 MPS-01 Target Data Measurement Units: ft Target Coordinate Vertical Depth Northings Eastings Vertical Depth Northings Eastings Target Name Point Type Well Well Well Mean Sea Level ASP-4 ASP-4 Shape (ft) (ft) (ft) (ft) (ft) (ft) MPS-O 1 L2 T1 Entry Point 4292.50 3882.70 N 4837,61 E 4220.00 6003970.00 N 570880.00 E Point MPS-O 1 L2 T2 Entry Point 4262.50 5277.74 N 4839.95 E 4190.00 6005365.00 N 570870,00 E Point MPS-Ol L2 T3 Entry Point 4242.50 5887.00 N 4360.32 E 4170.00 6005970.00 N 570385.00 E Point MPS-Ol L2 T4 Entry Point 4217.50 6430.83 N 3930.12 E 4145.00 6006510.00 N 569950.00 E Point DrillQuest 3,03.02.002 Sper,J-Sun Drilling Self ices Proposal Data - MPS-01- MPS-01 L2 Wp 3.0 . . . -.--- MD Delta Inclin. i Azimuth TVD Northings Easlings Dogleg T ooIface (fI) MD (ft) r') (0) (ft) (ft) (fI) (O/100ft) (0) -1 7487.00 59.719 36.462 4222.29: 3323.74 N 4463.00 Ej 2 7507.00 20.00: 62.119 36.462 4232.01 3337.80 N 4473.39 E! 12.000 0.000 -- 3 7731.02 224.02 89.002 36.508 4287.36 3510.63 N 4601.21 E 12.000 0.101 4 7983.55 252.53 89.002 36.508 4291.76 3713.57 N 4751.42 E 0.000 0.000 5T 8174.25 190.71 90.560 17.500 4292.50 3882.70 N 4837.61 E 10.000 274.607 6 8178.00 3.74 90.930 17.441 4292.45 3886.27 N 4838.73 E 10,000 350.953 7 8717.86 539.86 90.930 17.441 4283.69 4401.25 N 5000.52 E 0.000 0.000 8T 9645.20 927.34 91 .480 321.790 4262.50 5277,74 N 4839.95 E 6.000 271.157 - - 9 9645.30 0.11 91.474 321.790 4262.50 5277.82 N 4839.89 E 6.000 177.345 10 10410.75 765.44 91.474 321.790 4242.81 5879.07 N 4366.59 E 0.000 0.000 11T 10420.86 10.11 92.065 321.654 4242.50 5887.00 N 4360.32 E 6.000 346.983 ! 12T ~ 11114.73 693.87 92.065 321.654 4217,50 6430.83 N 3930.12 E 0.000 0.000 6 October, 2003 - 14:05 - 1 - DrillQuest Sperry-Sun Drilling Services . posal Report 6 October, 2003 - Surface Coordinates: 6000044.65 N, 566076.93 E (70024' 38.0075" N, 149027' 43.0112" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 ~ Kelly Bushing: 72.500 above Mean Sea Level ~"~I m".. 'Y-SUr-] Þ'UL.LJNG .."VIC.. A HlIIIibv_ c_p.ny - e Proposal Ref: pro1282 Sperry-Sun Drilling Services Proposal Report for MPS-01 L2 Wp 3.0 BP EXPLORATION (ALASKA) INC. BPXA Milne Point Unit Measured Sub-5ea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft ./ 7487.00 59,719 36.462 4149.79 4222.29 3323.74 N 4463.00 E 6003407.75 N 570510.35 5163,37 KopTF HS Begin Dir @ 12.000°/1001 6003416_ N""*'.16.99 E 7487,00ft MD, 4150.81ft TVD 7500,00 61.279 36.462 4156.20 4228.70 3332,84 N 4469,72 E 12.000 5174.64 7507.00 62.119 36.462 4159.51 4232.01 3337.80 N 4473,39 E 6003421.90 N 570520,61 E 12.000 5180,78 7600,00 73.279 36.482 4194,75 4267.25 3406.88 N 4524,45 E 6003491.43 N 570571 .07 E 12.000 5266.36 7700,00 85.279 36,502 4213.32 4285.82 3485.73 N 4582,78 E 6003570,79 N 570628.69 E 12.000 5364,05 7731.02 89,002 36.508 4214,86 4287.36 60ðIJli.85 N 570646.90 E 12,000 5394.91 End Dir, Start Sail @ 89.002° : e 7731.02ftMD,4287.36ftTVD 7800.00 89.002 36.508 4216.07 4288.57 6003651.64 N 570687.44 E 0,000 5463.61 7900.00 89.002 36.508 4217.81 4290.31 6003732,53 N 570746.21 E 0.000 5563.20 7983,55 89.002 36,508 4219,26 4291.76 6003800.11 N 570795,31 E 0.000 5646.40 Begin Dir @ 10.0000/100ft: 7983.55t MD, 4291.76ft TVD 8000.00 89,134 34.867 4219.53 4292.0~!I!II!& 6003813,56 N 570804.79 E 10.000 5662.81 8100.00 89.951 24,900 4220,33 4292.83 3813.52 N 4810.78 E 6003900.59 N 570853.78 E 10.000 5762,64 8174.25 90.560 17.500 4220,00 4292.50 3882.70 N 4837.61 E 6003970.00 N 570880.00 E 10.000 5835,66 Target - MPS-01 L2 T1, Current Targ€ 8178,00 90.930 17.441 4219.95 4292.45 3886.27 N 4838.73 E 6003973.58 N 570881.09 E 10.000 5839.30 End Dir, Start Sail @ 90.930° : 8178.00ftMD,4292.45ftTVD 8200.00 90.930 3907.26 N 4845.33 E 6003994.63 N 570887.50 E 0.000 5860,64 8300.00 90.930 4002.65 N 4875.30 E 6004090.28 N 570916,62 E 0.000 5957.67 .11111 8400.00 90.93d .. 4288.85 4098.04 N 4905.27 E 6004185.93 N 570945,75 E 0.000 6054.69 8500,00 90.930 4287.23 4193.43 N 4935.23 E 6004281.58 N 570974,87 E 0,000 6151.71 8600.00 90.930 4285.60 4288.82 N 4965.20 E 6004377.23 N 571003.99 E 0.000 6248,73 8700,00 90.930 4283.98 4384.21 N 4995.17 E 6004472.88 N 571033.12 E 0.000 6345.75 8717.86 90.930 4283.69 4401.25 N 5000.52 E 6004489.97 N 571038.32 E 0,000 6363,08 Begin Dir @ 6.0000/100ft: 8717.86ft MD, 4283,69ft TVD e 8800.00 91 .026 12,513 4209.79 4282.29 4480.56 N 5021.74 E 6004569.47 N 571058.83 E 6.000 6441.82 8900.00 91 .132 6,513 4207.90 4280.40 4579.12 N 5038.26 E 6004668.17 N 571074.48 E 6.000 6534,53 9000,00 91 .226 0.512 4205.84 4278.34 4678.87 N 5044.38 E 6004767.97 N 571079.72 E 6.000 6622.83 9100,00 91 ,307 354.511 4203.63 4276.13 4778.71 N 5040.04 E 6004867.76 N 571074.50 E 6.000 6705,76 9200,00 91 ,373 348.510 4201.29 4273.79 4877,54 N 5025.29 E 6004966,46 N 571058.87 E 6.000 6782.40 9300.00 91 .425 342.509 4198,85 4271.35 4974,28 N 5000,29 E 6005062.98 N 571033.01 E 6.000 6851,91 9400.00 91 ,461 336.507 4196.33 4268.83 5067,88 N 4965,31 E 6005156.26 N 570997,21 E 6.000 6913.53 9500.00 91 .480 330,505 4193.76 4266.26 5157,31 N 4920.73 E 6005245,29 N 570951.84 E 6.000 6966.59 9600.00 91 ,484 324.503 4191.17 4263.67 5241.59 N 4867.05 E 6005329.09 N 570897.42 E 6.000 7010.51 9645.20 91.480 321,790 4190.00 4262,50 5277.74 N 4839.95 E 6005365,00 N 570870.00 E 6,000 7027.22 Target - MPS-01 L2 T2, Current Targ€ 6 October, 2003 -14:06 Page2of5 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for MPS-01 L2 Wp 3.0 BP EXPLORA nON (ALASKA) INC. BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft 9645.30 91 .474 321.790 4190.00 4262,50 5277 .82 N 4839.89 E 6005365.08 N 7027.26 End Dir, Start Sail @ 91.474° : 9645.30ftM D ,4262,50ftTVD 9700.00 91.474 321.790 4188.59 4261.09 5320,78 N 4806.07 E 0.000 7046.28 9800.00 91.474 321,790 4186.02 4258.52 5399.33 N 4744.23 E 0.000 7081,06 9900.00 91.474 321 .790 4183.45 4255.95 5477.88 N 4682.40 E 0.000 7115,84 10000,00 91.474 321 .790 4180,88 4253.38 5556.43 N 4620,57 E 0.000 7150.62 10100.00 91,474 321.790 4178,30 4250.80 5634.98 N 60 .74N 570585.63 E 0.000 7185.40 e 10200,00 91.474 321.790 4175.73 4248,23 5713.53 N 6005797.74 N 570523.10 E 0.000 7220.18 10300.00 91.474 321.790 4173.16 4245.66 5792,08 N 6005875.74 N 570460.58 E 0,000 7254.96 10400.00 91.474 321.790 4170,59 4243,09 5870.63 N 6005953,74 N 570398.05 E 0,000 7289.74 10410.75 91.474 321.790 4170,31 4242.81 ,07 N 6005962.12 N 570391,33 E 0,000 7293.48 Begin Dir @ 6.0000/100ft: 10410.75t MD, 4242.81ft TVD 10420.86 92,065 321.654 4170,00 N 4360.32 E 6005970.00 N 570385.00 E 6.000 7296.98 End Dir, Start Sail @ 92.065° : 10420 .86ftM D ,4242,50ftTVD Target - MPS-01 L2 T3, Current TargE 10500.00 92.065 321 ,654 4167, 5949.03 N 4311.26 E 6006031.59 N 570335.38 E 0.000 7324.32 10600.00 92.065 321.654 4163,55 6027.41 N 4249.25 E 6006109.42 N 570272.69 E 0,000 7358.86 10700.00 92.065 321.654 4159,94 6105.78 N 4187.25 E 6006187.24 N 570210.00 E 0.000 7393.41 10800.00 92.065 321.654 4156.34 6184.16 N 4125,25 E 6006265.07 N 570147.31 E 0.000 7427.95 10900.00 92.065Âs2 . 52.74 4225,24 6262.54 N 4063.25 E 6006342,89 N 570084.62 E 0.000 7462.50 11000.00 92.065 321.654 49.13 4221,63 6340,91 N 4001.25 E 6006420.72 N 570021.92 E 0.000 7497.04 11100.00 92,065 321.654 4145.53 4218.03 6419.29 N 3939.25 E 6006498.54 N 569959,23 E 0.000 7531.59 11114.73 92.065 ~,654 4145.00 ~ 4217,50 6430,83 N 3930,12 E 6006510.00 N 569950.00 E 0,000 7536.67 Total Depth: 11114,73ftMD,4217.50ftTVD 4 1/2in Liner Target - MPS-01 L2 T4, Current e All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4, The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 31.431 ° (True). Magnetic Declination at Surface is 25.357°(05-0ct-03) Based upon Minimum Curvature type calculations, at a Measured Depth of 11114,73ft., The Bottom Hole Displacement is 7536.67ft., in the Direction of 31.431 ° (True). The Along Hole Displacement is 9207.58ft, the Planned Tortuosity is 3.312°/100ft and the Directional Difficulty Index is 6.4. 6 October, 2003 -14:06 Page30f5 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for MPS-01 L2 Wp 3.0 BP EXPLORA TlON (ALASKA) INC. Milne Point Unit Comments Measured Depth (ft) 7487.00 7731,02 7983.55 8178.00 8717.86 9645.30 10410.75 10420.86 11114.73 CasinQ details From Measured Depth (ft) 7487,00 6 October, 2003 -14:06 BPXA Station Coordinates TVD Northings Eastings (ft) (ft) (ft) . Comment 4222,29 3323.74 N 4463.00 E 4287,36 3510.63 N 4601.21 E 4291,76 3713.57 N 4751,42 E 4292,45 3886.28 N 4283.69 4401.25 N 4262.50 5277.82 N 4242.81 5879.07 N 4242.50 5887.00 N 4217,50 e 0° : 8178.00ftMD,4292,45ftTVD 717.86ft MD, 4283.69ft TVD , 74°: 9645.30ftMD,4262.50ftTVD 100ft: 10410.75ft MD, 4242.81ft TVD íI @ 92,065° : 10420.86ftMD,4242.50ftTVD I Depth: 11114.73ftMD,4217.50ftTVD Casing Detail <Run-TD> <Run-TD> 4 1/2in Liner - Page 4 of5 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for MPS-01 L2 Wp 3.0 BP EXPLORA TION (ALASKA) INC. Milne Point Unit BPXA TarQets associated with this welløath Target Name MPS-01 L2 T1 MPS-01 L2 T2 MPS-01 L2 T3 MPS-01 L2 T4 6 October, 2003 -14:06 11. nates Eastings Target Target (ft) Shape Type 4837,61 E Point Current Target 570880.00 E 149025' 21.1294" W e 5277.74 N 4839.95 E Point Current Target 6005365,00 N 570870,00 E 700 25' 29.9026" N 1490 25' 21 .0342" W 4242,50 5887.00 N 4360,32 E Point Current Target eVGlobal Coordinates: 4170.00 6005970.00 N 570385.00 E graphical Coordinates: 70025' 35.8981" N 149025' 35.0933" W 4217.50 6430,83 N 3930,12 E Point Current Target ean Sea Level/Global Coordinates: 4145.00 6006510,00 N 569950.00 E Geographical Coordinates: 700 25' 41.2494" N 149025' 47.7057" W e Page50f5 DrillQuest 3.03.02.002 WElL DETAILS ANTI-COLLISION SETTINGS Natœ +N/-S +EI-W Northing MPS-OI 69.04 ·267.49 6000044.65 -121 ····-100 -75 ··SO -25 -0 270 -25 -50 -75 -100 -121 From Colour ToMD 7487 7500 7500 7750 7750 8000 8000 8250 0 8250 8500 8500 8750 8750 9000 9000 9250 9250 9500 9500 9750 9750 10000 10000 10250 10250 10500 10500 10750 10750 11 000 11000 11250 11250 11500 11500 11750 -20.0 -15,0 EastbJg latitude longitude Slot 566076.93 7O"'24·38.008N 149"2143.0IlW N/A Interpolation MethodMD Depth Range From: 7487.00 Maximum Range: 1308.12 Interval: 25.00 To: II 1I5,43 Reference: Plan: MPS-Ql L2 Wp 3.0 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [50ft/in] COMPANY DETAILS BP Amoco Cakuh60n Method: :Minirrwm CUlVature =~ ~~~kNoIth W'=:=: ~~J$ing SURVEY PROGRAM Jepth Pm Depth To SUlVeylPlm 7487.00 11115.43 Pkumed:MPS-OlL2Wp3.0V8 rool MWo.-IFR+MS WELLPATH DEI AILS Plan MPS-Ol L2 ParentWel\Mth: Tie on MD: MPS-OI 7487.00 From Colour 7487 7500 7750 8000 8250 8500 8750 9000 9250 9500 9750 10000 .-- 10250 o 10500 750 o -5,0 90 -Œ70 90 --5.0 '-10.0 ·-15.0 -20,0 18!¥"U Rig: Ref. Datum: MPS-OI: 72.500 V.Seçoon Origin Origin Angle +NI-S +EI-W s...... From TVD ToMD 7500 7750 8000 8250 8500 8750 9000 9250 9500 9750 10000 10250 10500 10750 11 000 11250 11500 11750 n.:r Lot: Hili ~ :.!J LEGEND - MPE-29(MPE-29), MajJrRid: - MPS-OI (MPS-Ol), NOERRORS - MPS-OI (MPS-OIL1). NOERRORS MPS-Ol (MPS-OIPBI), NOERRORS MPS-07 (MPS-07). MajJr Rid.: Plm MPS-OI L2 MPS-OI L2 Wp 3.0 e e Phn: MPS-Ol L2 Wp 3.0 (MPS-OIlPim MPS-OI L2) Created By: Bart Goff Date: loro6I2OO3 ::hecked: Dote Dote Dote Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [15ft/ir rrovol: Reviewed: SECTIONDETAll..S s~ MD In, A>; TVD +N/-S +FJ-W DLo, TFaçe VS~ TUg<! I 7487.00 59.72 36.4ó 4222.29 3323.93 4462,97 0,00 0.00 5163.51 2 7507.00 62.12 36.4ó 4232.02 3337.99 4473.36 12.00 0.00 5180.92 3 7731.03 89,00 3655 4287.37 3510.77 4601.26 12.00 0.11) 5395.04 4 7983.55 89.00 36.55 4291.76 3713.59 4751.62 0,00 0.00 5646.51 5 8174.69 90.56 17.50 4292.50 3883.07 4838.07 10.00 -85.42 5836.21 MPSOILl Tl Rev 1 6 8178,48 90.93 17.44- 4292.45 3886." 4839.21 10.00 -9.43 5839.89 7 8718.47 90.93 17,44 4283.68 4401.80 5001.01 0,00 0.00 6363.78 8 9645.76 91.48 321.79 4262.50 5278.24 4840.41 6.00 -88.85 7027.88 MPSOILl T2 Rev 1 9 9645.83 91.47 321.79 4262.50 5278.29 4840.37 6,00 166.98 7027.91 10 10411.39 91.47 321.79 4242.81 5879.63 4367.00 0,00 0.00 7294.16 II 10421.50 92.06 321.65 4242.50 5887.56 4360.74 6.00 -13.02 7297.67 MPSOILl T3 Rev 1 12 11115.43 92.06 321.65 4217.50 6431.44 3930.49 0.00 0.00 7537.39 MPSOILl T4 e Sperry-Sun Anticollision Report e Company: Field: Reference Site: Reference Well: Reference Wellpath: BPAmoco Milne Point MPtSPad MPS-01 Plan MPS-01 L2 Date: 10/06/2003 Time: 14:53:24 Page: .. 1 Co-ordinate(NE) Reference: Well: MPS-01, True North Vertical (TVD) Reference: MPS-01: 72.5 GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval: 25.00 ft Depth Range: 7487,00 to 11115.43 ft Maximum Radius: 1308.12 ft Reference: Error Model: Scan Method: Error Surface: Db: Oracle Principal Plan & PLANNED PROGRAM ISCW SA Ellipse Trav Cylinder North Ellipse + Casing Survey Program for Definitive Wellpath Date: 10/06/2003 Validated: No Planned From To Survey ft ft 120.00 245.00 367.16 6757.35 6800.00 7487.00 7487,00 11115.43 Version: 0 Toolcode Tool Name MPS-01 Gyro (120.00-245.00) (0) MPS-01 PB1 IIFR (367,16-11267.27) (0) MPS-01 IIFR (6800.00-10446,00) (1) Planned: MPS-01 L2 Wp 3.0 V8 KPR-SS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS SDC Keeper single shots MWD + IFR + Multi Station MWD + IFR + Multi Station MWD + IFR + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in in 11166.02 0.00 4.500 6.000 41/2" Summary <--------------------- Offset Wellpath ------------------> Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft MPtEPad MPE-29 MPE-29 V1 Out of range M PtS Pad MPS-01 MPS-01 V4 7500.00 7500.00 0.15 0.00 0,15 Pass: NOERRORS M PtS Pad MPS-01 MPS-û1L1 V3 7500.00 7500.00 0.15 0.00 0.15 Pass: NO ERRORS M PtS Pad MPS-01 MPS-01 PB1 V7 7490.03 7525,00 159.15 0.00 159.15 Pass: NOERRORS M PtS Pad MPS-07 MPS-07 V9 9918.67 8694.80 1006.22 89.38 916.84 Pass: Major Risk Site: M PtS Pad Well: MPS-01 Rule Assigned: NOERRORS Wellpath: MPS-01 V4 Inter-Site Error: 0,00 ft .-., '-----_._'--_.__._.~-_..._._---'_.- Reference Offset Semi-Ml\ior Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H!Ðistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 7500,00 4228.70 7500,00 4228.82 25.25 25.13 223.67 187.21 7.625 0.15 0.00 0.15 Pass 7524.94 4240.10 7525.00 4241.20 25.25 25.13 223.91 187.44 7.625 1.23 0.00 1.23 Pass 7549.78 4250.30 7550.00 4252.90 25.25 25,13 224.88 188.40 7.625 2.85 0.00 2.85 Pass 7574.51 4259.27 7575.00 4263.79 25,26 25.15 225.75 189,25 7,625 4,87 0,00 4.87 Pass 7599.08 4266.98 7600.00 4273.85 25.27 25.16 226.46 189.96 7.625 7.28 0.00 7.28 Pass 7623.48 4273.45 7625.00 4283.11 25.29 25.19 227.29 190.78 7,625 10,12 0,00 10.12 Pass 7647,66 4278.66 7650.00 4291.68 25.32 25.22 228.82 192.30 7.625 13.57 0.00 13.57 Pass 7671.56 4282.63 7675.00 4299,58 25.36 25.26 230,56 194.03 7.625 17.64 0.00 17.64 Pass 7695,16 4285.39 7700.00 4306.80 25.40 25.31 232.26 195.72 7.625 22.33 0.00 22.33 Pass 7718.40 4286.98 7725.00 4313.43 25.45 25.37 233,65 197.11 7.625 27.70 0.00 27,70 Pass 7741.91 4287.55 7750.00 4319.65 25.51 25.44 234.60 198.05 7.625 33.76 0.00 33.76 Pass 7766,19 4287.98 7775.00 4325.47 25.58 25.51 235.65 199.10 7.625 39.68 0.00 39.68 Pass 7790.53 4288.40 7800.00 4330.89 25.64 25.58 236,86 200.30 7.625 45.31 0.00 45.31 Pass 7814,92 4288.82 7825.00 4335.95 25.71 25.65 238.09 201.54 7.625 50,67 0.00 50.67 Pass 7839.36 4289.25 7850.00 4340.73 25.78 25,73 239.29 202.73 7.625 55.83 0.00 55.83 Pass 7863.84 4289.68 7875.00 4345.23 25.85 25,80 240.46 203.91 7.625 60.78 0.00 60.78 Pass 7888.35 4290.10 7900.00 4349.45 25.92 25.88 241.63 205.08 7.625 65.53 0.00 65.53 Pass 7912,87 4290.53 7925.00 4353.37 25.99 25.95 242.91 206,36 7.625 70,14 0.00 70.14 Pass 7937.40 4290.96 7950.00 4356.99 26.06 26.03 244.32 207.77 7.625 74.64 0.00 74.64 Pass 7961.92 4291.38 7975.00 4360.31 26.13 26.11 245,85 209.29 7.625 79.04 0.00 79.04 Pass 7986.62 4291.81 8000.00 4363.34 26.16 26.15 247.20 210.96 7.625 83.42 0,00 83.42 Pass 8012.93 4292.21 8025.00 4366,16 25.82 25.85 246.18 212.56 7.625 87.75 0.00 87.75 Pass 8039.50 4292.51 8050.00 4368.79 25.45 25,50 244.84 213.87 7.625 91.88 0.00 91.87 Pass 8066.32 4292.72 8075.00 4371.23 25,02 25.10 243.23 214.92 7.625 95.76 0.00 95.75 Pass 8093.38 4292.82 8100.00 4373.47 24.54 24,63 241.27 215.67 7.625 99.28 0.00 99.28 Pass e Sperry-SUD .- Anticollision Report Company: BP Amoco Date: 1010612003 Time: 14:53:24 Page: 2 Held: Milne Point Reference Site: M PtS Pad Co-ordinate(NE) Reference: Well: MPS-01, True North Reference Well: MPS-01 Vertical (TVD) Reference: MPS-01: 72.5 Reference Wellpath: Plan MPS-Q1 L2 Db: Oracle Site: M PtS Pad Well: MPS-01 Rule Assigned: NOERRORS Wellpath: MPS-01 V4 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis . Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AzI TI<'O-HS CasingIHIDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 8120.70 4292.82 8125.00 4375,59 23,99 24.10 238.71 215.83 7,625 102.09 0.00 102.09 Pass 8148.15 4292.71 8150.00 4377.58 23.41 23.52 235.57 215.42 7.625 104.15 0.00 104.15 Pass 8175.41 4292.49 8175.00 4379,44 22.79 22.91 231,96 214.48 7.625 105.48 0.00 105.48 Pass 8199.88 4292,10 8200.00 4381.18 22,85 22.98 230.71 213.27 7.625 106.56 0.00 106.56 Pass 8224.78 4291.70 8225.00 4382.79 22.93 23.05 229,65 212,21 7.625 107.68 0.00 107.67 Pass 8249.69 4291.29 8250.00 4384.27 23.01 23.14 228.75 211,31 7,625 108,85 0.00 108.84 Pass 8274.63 4290.89 8275,00 4385.54 23.09 23.23 228,13 210.69 7.625 110.09 0.00 110.08 Pass 8299.59 4290,48 8300.00 4386.61 23.17 23.32 227.76 210.32 7.625 111.37 0.00 111.37 Pass 8324.55 4290.08 8325.00 4387.57 23.25 23.42 227.49 210.05 7.625 112,65 0,00 112.65 Pass 8349.51 4289.67 8350.00 4388.47 23.33 23,51 227.30 209.86 7.625 113.94 0.00 113.94 Pass 8374.47 4289.27 8375.00 4389.33 23.41 23.60 227.29 209.85 7.625 115.38 0.00 115.38 Pass 8399.42 4288,86 8400.00 4390.13 23.49 23.68 227.41 209.97 7.625 116.91 0.00 116.91 Pass 8424,38 4288.46 8425.00 4390.83 23.58 23.76 227.54 210.10 7.625 118.35 0.00 118.35 Pass 8449,35 4288.05 8450.00 4391.31 23.66 23.84 227.71 210.28 7.625 119.58 0.00 119.58 Pass 8474,32 4287.64 8475.00 4391.21 23.75 23.91 228.06 210.62 7.625 120.36 0.00 120.36 Pass 8499.30 4287.24 8500.00 4390.77 23.83 23.98 228.49 211.06 7.625 120.87 0.00 120.87 Pass 8524,28 4286.83 8525.00 4390.37 23.92 24.05 228.91 211.47 7.625 121.41 0.00 121.41 Pass 8549.26 4286.43 8550.00 4389.91 24,00 24.11 229.31 211.87 7,625 121.87 0.00 121.87 Pass 8574.25 4286.02 8575.00 4389,24 24.09 24.17 229.71 212,27 7,625 122.08 0.00 122.08 Pass 8599.24 4285.61 8600.00 4388.63 24.18 24.23 230,03 212.60 7.625 122.28 0.00 122.28 Pass 8624.20 4285.21 8624.97 4388.35 24,27 24.29 230.22 212.78 7,625 122.69 0.00 122.69 Pass 8649.22 4284.80 8650.00 4388,20 24.35 24.36 230.37 212.93 7.625 123.20 0.00 123.20 Pass 8674.21 4284.40 8675,00 4387.95 24.44 24.45 230.59 213.15 7.625 123.70 0.00 123.70 Pass 8699.20 4283.99 8700.00 4387.54 24.53 24.54 230.90 213.46 7.625 124,14 0.00 124.13 Pass 8724.61 4283.58 8725.00 4386.95 24.52 24.54 230.92 213.85 7.625 124.49 0.00 124.49 Pass 8751.51 4283,13 8750.00 4386.58 24.17 24.18 229.48 214.02 7.625 124.83 0.00 124.83 Pass 8778.42 4282.67 8775.00 4386.61 23.78 23,81 227.69 213.85 7.625 125.17 0.00 125.17 Pass 8805.30 4282,19 8800.00 4386,64 23,38 23.41 225.67 213.44 7.625 125.19 0.00 125.19 Pass 8832.13 4281,70 8825.00 4386.61 22.96 23.01 223.43 212.81 7.625 124.84 0.00 124.84 Pass 8858,86 4281.20 8850.00 4386.61 22.54 22.59 220.93 211.92 7,625 124.21 0.00 124.21 Pass 8885.45 4280.69 8875.00 4386.69 22.10 22.15 218,10 210.68 7.625 123.28 0.00 123.28 Pass 8911.72 4280.17 8900.00 4387.00 21.65 21.68 214.63 208.79 7.625 121.92 0.00 121.92 Pass 8937.57 4279.65 8925.00 4387,54 21.20 21.21 210,55 206.26 7.625 120.33 0.00 120.33 Pass 8963.11 4279.12 8950.00 4388.33 20.74 20.73 206.13 203.37 7.625 118.99 0,00 118.99 Pass 8988.30 4278.59 8975,00 4389.42 20.28 20,25 201.37 200.12 7.625 118.06 0.00 118.06 Pass 9013,08 4278.06 9000,00 4390.93 19.82 19,76 196.22 196.46 7.625 117.72 0.00 117.72 Pass 9037.40 4277.53 9025.00 4392.78 19.36 19.28 190.74 192.43 7.625 118.04 0.00 118.04 Pass 9061.24 4277.00 9050.00 4394.79 18.89 18.79 184.99 188,11 7.625 119.01 0.00 119.01 Pass 9084,61 4276.48 9075,00 4396.86 18.43 18.32 179.05 183.59 7.625 120.64 0.00 120.64 Pass 9107.52 4275,96 9100.00 4398.85 17.98 17.85 173,03 178.94 4.500 122.94 0.00 122.94 Pass 9129.91 4275,44 9125.00 4400.57 17.53 17.39 166,92 174.17 4.500 125.81 0.00 125.81 Pass 9151,76 4274.93 9150.00 4401.89 17,09 16.93 160.74 169.30 4.500 129.24 0,00 129.24 Pass 9173.12 4274,43 9175.00 4403.20 16.65 16.48 154,67 164.52 4.500 133.66 0.00 133.66 Pass 9194.08 4273.93 9200.00 4404.78 16,22 16.03 148.90 160.01 4.500 139.28 0.00 139.28 Pass 9214.61 4273.44 9225.00 4406.64 15.80 15.59 143 .48 155.81 4.500 146.06 0.00 146.06 Pass 9234.72 4272.95 9250,00 4408.79 15.39 15.16 138.43 151.97 4.500 153.93 0.00 153.93 Pass 9254.40 4272.47 9275.00 4410.94 14.99 14.75 133,69 148.41 4.500 162.61 0.00 162.61 Pass 9273.65 4272.00 9300,00 4412.98 14.60 14,36 129.22 145.10 4.500 171.95 0.00 171.95 Pass 9292.45 4271.54 9325.00 4414.93 14.22 13.99 125.02 142.03 4.500 181.96 0.00 181.96 Pass 9310.79 4271.08 9350.00 4416.79 13.85 13.63 121.07 139.17 4.500 192.62 0.00 192.62 Pass e e Sperry-Sun Anticollision Report .. .----,.,.---.....""" Com¡r.III~·: BP Amoco nate: 10106/2003 Tillie: 14:53:24 Pn~e: ., Field: Milne Point Kererence Site: M Pt S Pad Co-ordinuteClil':) Ref'erellœ: Well: MPS-01, True North Kel'erence Well: MPS-01 Verticul (T\'U) Kcfel'enl~e: MPS-01: 72.5 Kererenœ Wellpath: Plan MPS-O 1 L2 nb: Oracle ..----.-... ----...------ Site: M PtS Pad Well: MPS-01 Rule Assigned: NOERRORS Wellpath: MPS-01 V4 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr· No-Go AJlowdble· MD TVD MD TVD Ref Offset .....'O+AZI TFO-IIS CasingIII!Ðistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 9328.50 4270.64 9375.00 4418.54 13,50 13.27 117.30 136.47 4.500 204.07 0.00 204.07 Pass 9345.58 4270.21 9400.00 4420.17 13.17 12.93 113,72 133.92 4.500 216.28 0.00 216,28 Pass 9362.18 4269.79 9425.00 4421.58 12.86 12.60 110.34 131.53 4.500 229.02 0.00 229.01 Pass 9378.34 4269.38 9450.00 4422.79 12.56 12.28 107,15 129.31 4.500 242.24 0.00 242.24 Pass 9394.03 4268.98 9475.00 4424.05 12.27 11.99 104.18 127.28 4.500 256.08 0.00 256.07 Pass 9409.22 4268.60 9500.00 4425.29 12.00 11.70 101.40 125.41 4.500 270.49 0.00 270.49 Pass 9423.77 4268.22 9525.00 4426.19 11.76 11.44 98.72 123.61 4.500 285.47 0.00 285.47 Pass 9437.75 4267,87 9550.00 4426.82 11.52 11.20 96,17 121 ,89 4.500 300,97 0.00 300.97 Pass 9450.00 4267.55 9575.00 4427.48 11.32 11.01 93.87 120.33 4.500 316.89 0.00 316.89 Pass 9464.58 4267,18 9600.00 4428.09 11.11 10.78 91,55 118,89 4.500 333,21 0.00 333.21 Pass 9477.30 4266.85 9625,00 4428.54 10.92 10,60 89.43 117 .53 4.500 349.98 0.00 349.98 Pass 9489.60 4266.53 9650.00 4428.83 10.75 10.44 87.41 116.25 4.500 367.09 0.00 367.09 Pass 9500.00 4266.27 9675.00 4428,97 10.60 10.33 85.59 115.06 4,500 384.47 0,00 384.46 Pass 9513.26 4265.92 9700,00 4429.21 10.45 10,17 83.71 113.96 4.500 402.17 0.00 402.17 Pass 9524,58 4265.63 9725,00 4429.73 10.32 10,06 82.05 112.99 4.500 420.30 0.00 420.30 Pass 9535.59 4265.35 9750.00 4430,39 10.20 9.95 80.51 112.11 4.500 438.73 0.00 438,73 Pass 9550.00 4264.97 9775.00 4431.05 10.04 9,81 78.82 111.28 4.500 457.41 0.00 457.41 Pass 9550.00 4264.97 9800.00 4431.58 10,04 9.85 78.06 110.52 4.500 476.33 0.00 476.33 Pass 9566.81 4264,54 9825.00 4431,91 9.90 9.71 76,28 109.76 4.500 495,35 0.00 495.35 Pass 9576.69 4264,28 9850.00 4432.27 9.83 9.65 75,00 109.06 4.500 514.58 0.00 514.58 Pass 9586.42 4264.03 9875.00 4432.74 9.75 9.60 73.78 108.43 4.500 533,93 0.00 533.93 Pass 9600.00 4263,68 9900.00 4433.29 9.64 9.52 72,38 107.84 4.500 553.37 0.00 553.36 Pass 9600.00 4263.68 9925.00 4433.89 9.64 9.55 71.85 107.32 4.500 572.88 0.00 572.88 Pass 9614.53 4263.31 9950.00 4434.20 9.57 9.48 70.43 106.77 4.500 592.62 0.00 592.62 Pass 9623.12 4263.08 9975,00 4434.19 9.53 9.45 69.37 106.22 4.500 612.71 0.00 612.71 Pass 9631.44 4262.87 10000.00 4433,98 9.48 9.43 68.34 105.69 4.500 632.97 0.00 632.97 Pass 9645.76 4262.50 10025.00 4433.72 9.41 9,38 66.96 105.17 4.500 653.42 0.00 653.42 Pass 9648.56 4262.43 10050.00 4433.84 9.42 9.40 66.53 104,74 4.500 674,00 0.00 674.00 Pass 9661.70 4262.09 10075.00 4434.42 9.45 9.42 66.16 104.37 4.500 694.80 0.00 694.79 Pass 9674.65 4261.76 10100.00 4435.57 9.49 9.44 65.85 104.06 4.500 715.84 0.00 715.84 Pass 9687.50 4261.43 10125.00 4437.14 9.52 9.46 65.59 103.80 4.500 737.03 0.00 737.03 Pass 9700.52 4261.09 10150.00 4438.77 9.55 9.49 65,35 103,56 4.500 758.15 0.00 758,15 Pass 9713.60 4260,75 10175.00 4440.45 9.58 9.51 65.13 103.34 4.500 779.25 0.00 779.24 Pass 9726.62 4260.42 10200.00 4442.15 9.62 9.53 64.92 103.13 4.500 800.40 0,00 800.40 Pass 9739.58 4260.09 10225.00 4444.03 9,65 9.55 64.73 102.94 4,500 821.61 0.00 821,61 Pass 9752.54 4259.75 10250,00 4446.22 9.69 9.57 64.58 102.79 4.500 842.87 0.00 842.87 Pass 9765.56 4259.42 10275.00 4448,34 9.72 9.60 64.42 102.63 4.500 864.09 0.00 864.09 Pass 9778,72 4259.08 10300.00 4449.92 9,76 9.63 64.25 1 02.46 4.500 885.17 0.00 885.17 Pass 9791.78 4258.74 10325,00 4451.29 9.79 9,65 64.06 102.27 4.500 906.29 0.00 906.29 Pass 9804.55 4258.42 10350.00 4452.70 9,83 9.68 63.88 102,09 4.500 927.60 0.00 927.60 Pass 9817.21 4258.09 10375.00 4454.03 9.88 9.71 63.71 101,92 4.500 948.96 0,00 948.96 Pass 9829.92 4257,76 10400.00 4455.19 9.92 9.73 63.53 101.74 4.500 970.29 0.00 970.29 Pass 9842.58 4257.44 10425.00 4456.44 9.96 9.76 63.37 101,58 4.500 991.66 0.00 991.66 Pass 9855.17 4257.11 10450.00 4457.87 10.01 9.78 63.22 101.43 4,500 1013.11 0.00 1013.11 Pass 9867.72 4256,79 10475.00 4459.38 10.05 9,80 63.09 101.30 4.500 1034.59 0.00 1034.59 Pass 9880.28 4256.47 10500,00 4460.89 10.09 9.81 62.96 101.16 4.500 1056.07 0.00 1056.07 Pass 9887,82 4256.27 10515.00 4461,80 10.12 9.82 62.88 101.09 4.500 1068.96 0.00 1068.96 Pass e e Sperry-Sun Anticollision Report Company: BP Amoco Date: 1010612003 Time: 14:53:24 Page: 4 Held: Milne Point Reference Site: M Pt S Pad Co-ordinate(NE) Reference: Well: MPS-01, True North Reference Well: MPS-01 . Vertical (TVD) Reference: MPS-01: 72.5 Reference Wellpath: Plan MPS-01 L2 Db: . Oracle Site: M PtS Pad Well: MPS-01 Rule Assigned: NOERRORS Wellpath: MPS-01 L1 V3 Inter-Site Error: 0.00 ft . Reference Offset Semi-M:üor Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref· Offset TFO+AZI TFO-IIS CasinglII1Ðistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 7500,00 4228.70 7500.00 4228.82 25.25 25.13 223.67 187.21 4,500 0.15 0.00 0.15 Pass 7524.94 4240.10 7525.00 4241.20 25.25 25.13 223,91 187.44 4.500 1.23 0.00 1.23 Pass 7549.78 4250.30 7550.00 4252,90 25.25 25.13 224.88 188.40 4.500 2.85 0.00 2.85 Pass 7574.51 4259.27 7575.00 4263.79 25.26 25.15 225,75 189.25 4.500 4.87 0.00 4,87 Pass 7599.08 4266.98 7600.00 4273.85 25,27 25.16 226.46 189.96 4.500 7.28 0.00 7.28 Pass 7623.48 4273.45 7625.00 4283.11 25,29 25.18 227.29 190.78 4.500 10.12 0.00 10.12 Pass 7647.66 4278,66 7650.00 4291.68 25.32 25.21 228.82 192.30 4.500 13.57 0.00 13.57 Pass 7671.56 4282.63 7675,00 4299.58 25.36 25.25 230.55 194.02 4.500 17.64 0.00 17.64 Pass 7695.17 4285,40 7700.00 4306.75 25.40 25,29 232.16 195.63 4.500 22.26 0,00 22.26 Pass 7718.52 4286.98 7725.00 4312.94 25.45 25.34 233.38 196,83 4.500 27,15 0.00 27.15 Pass 7742.30 4287,56 7750.00 4318.14 25.51 25.40 234.38 197.83 4.500 32.13 0.00 32.13 Pass 7766,91 4287.99 7775.00 4322.42 25.58 25.46 235.65 199.10 4,500 36.44 0.00 36.44 Pass 7791.61 4288.42 7800.00 4326.07 25.64 25.53 237.09 200.54 4.500 40.21 0.00 40.21 Pass 7816.38 4288.85 7825.00 4329.00 25,71 25.59 238.75 202.20 4.500 43.38 0.00 43.38 Pass 7841.21 4289.28 7850.00 4331.01 25.78 25.66 240.77 204.22 4.500 45.77 0.00 45.77 Pass 7866.08 4289.71 7875.00 4332,14 25.85 25.72 243,16 206.61 4.500 47.45 0.00 47.45 Pass 7890.94 4290.15 7900,00 4332.48 25.92 25.79 245.92 209.37 4.500 48.58 0.00 48.58 Pass 7915.80 4290.58 7925.00 4332.33 26.00 25.86 248.94 212.39 4.500 49.45 0.00 49.45 Pass 7940.63 4291.01 7950.00 4332.01 26.07 25.93 252.04 215.49 4.500 50,36 0,00 50.36 Pass 7965.41 4291.44 7975.00 4331.59 26.14 26.00 255.48 218.93 4.500 51.61 0.00 51.61 Pass 7990.46 4291.88 8000.00 4331.20 26.11 25.97 258.72 222.86 4.500 53.66 0,00 53.66 Pass 8016.78 4292,26 8025.00 4330.97 25.77 25,64 259.41 226.17 4.500 55.90 0.00 55.90 Pass 8043.39 4292.55 8050.00 4330.98 25.40 25.26 259.02 228.44 4.500 57.93 0.00 57.93 Pass 8070.21 4292.74 8075.00 4331.10 24.95 24.82 257.89 229.98 4.500 59.66 0.00 59.65 Pass 8097.19 4292.83 8100.00 4331.26 24.47 24.33 256.22 231.00 4.500 61.06 0.00 61.06 Pass 8124.28 4292.81 8125.00 4331,46 23.91 23.79 253,95 231 .43 4.500 62.00 0.00 61.99 Pass 8151.42 4292.69 8150.00 4331.74 23.34 23.20 251.06 231.24 4.500 62.38 0.00 62.38 Pass 8178.04 4292.46 8175,00 4332.09 22.79 22.65 247.75 230,30 4.500 62,05 0,00 62.05 Pass 8202.97 4292.05 8200.00 4332.51 22.86 22.71 246.35 228.92 4.500 61.57 0.00 61.57 Pass 8227.93 4291.65 8225,00 4333.07 22.94 22.77 245.09 227.65 4,500 61.50 0.00 61,50 Pass 8252.90 4291 ,24 8250.00 4333.76 23.02 22,84 244.03 226.59 4.500 61.88 0.00 61.88 Pass 8277 .88 4290.84 8275.00 4334.48 23,10 22.91 243.13 225.69 4,500 62.49 0.00 62.49 Pass 8302.85 4290.43 8300.00 4335,21 23.18 22.98 242.36 224.93 4.500 63.26 0.00 63.26 Pass 8327.81 4290.02 8325.00 4336.12 23,26 23.06 241.66 224.22 4.500 64,33 0,00 64.33 Pass 8352.77 4289.62 8350.00 4337.24 23.34 23.12 240.98 223.54 4.500 65.71 0,00 65.71 Pass 8377.71 4289.21 8375,00 4338.51 23.42 23.19 240.21 222.78 4.500 67,17 0,00 67.17 Pass 8402,64 4288.81 8400.00 4339.88 23.50 23.25 239.38 221.94 4.500 68.67 0.00 68,67 Pass 8427.58 4288.40 8425,00 4341.14 23.59 23.32 238.65 221 ,21 4.500 70.10 0.00 70.10 Pass 8452.54 4288.00 8450.00 4342.12 23.67 23,39 238.08 220.64 4.500 71.33 0.00 71.33 Pass 8477.53 4287.59 8475,00 4342.42 23.76 23.46 237.83 220.39 4.500 71.99 0.00 71.99 Pass 8502.53 4287.19 8500.00 4342.18 23,84 23.53 237.82 220.38 4.500 72.20 0.00 72.20 Pass 8527.53 4286.78 8525.00 4341.74 23.93 23.61 237.89 220.45 4.500 72.24 0.00 72,24 Pass 8552.53 4286.37 8550.00 4341.27 24,01 23.67 237.95 220.51 4.500 72.21 0.00 72.21 Pass 8577 .53 4285.97 8575.00 4341.04 24,10 23.74 237.79 220.36 4.500 72,28 0,00 72.28 Pass 8602.53 4285.56 8600.00 4340,90 24,19 23.81 237,55 220.11 4.500 72.36 0.00 72.36 Pass 8627.53 4285.16 8625.00 4340.62 24.28 23,87 237.34 219.91 4,500 72.31 0.00 72,31 Pass 8652.52 4284.75 8650.00 4340.39 24.37 23.94 237.07 219.63 4.500 72.25 0.00 72.25 Pass 8677.52 4284.34 8675.00 4340.42 24.46 24.01 236.58 219.14 4,500 72.31 0.00 72.31 Pass 8702.51 4283.94 8700,00 4340.50 24.54 24.08 236.08 218.64 4.500 72.43 0.00 72.43 Pass 8727,94 4283.52 8725.00 4340.48 24.48 24.00 235.11 218.24 4.500 72.53 0.00 72.53 Pass 8754,11 4283.09 8750.00 4340.44 24.13 23.64 232,83 217.53 4.500 72.33 0.00 72.33 Pass e e Sperry-Sun Anticollision Report Company: BP Amoco Date: 10/06/2003 Time: 14:53:24 Page: 5 Held: Milne Point Reference Site: M Pt S Pad Co-ordinate(NE) Reference: .. Well: MPS-Q1, True North Reference Well: MPS-01 Vertical (TVD) Reference: MPS-Q1: 72.5 Reference Wellpath: Plan MPS-01 L2 Db: Oracle Site: M PtS Pad Well: MPS-01 Rule Assigned: NOERRORS Wellpath: MPS-01 L 1 V3 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset Tli'O+AZI TFO-HS CasingIH!ÐistaJice Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 8780.22 4282.63 8775.00 4340.41 23.75 23.27 230.11 216.38 4,500 71.77 0.00 71.77 Pass 8806.23 4282.17 8800.00 4340.41 23.37 22.88 226.99 214.82 4,500 70.95 0.00 70.94 Pass 8832.13 4281.70 8825.00 4340.42 22.96 22.48 223.45 212.83 4.500 69,89 0.00 69.89 Pass 8857.86 4281.22 8850.00 4340.26 22.56 22.07 219.44 210.37 4,500 68.44 0.00 68.44 Pass 8883.38 4280.73 8875.00 4339.90 22.13 21.64 214.85 207.30 4.500 66,61 0.00 66.61 Pass 8908.63 4280.23 8900.00 4339.95 21.71 21,21 209.33 203.30 4.500 65.04 0.00 65,04 Pass 8933.54 4279.73 8925.00 4340.49 21.27 20.76 202.83 198.29 4.500 64.01 0.00 64.01 Pass 8958,04 4279.22 8950.00 4341.54 20.84 20.31 195.33 192.27 4.500 63.79 0.00 63.79 Pass 8982.08 4278.72 8975.00 4343.03 20.40 19.86 187.11 185.49 4.500 64.62 0.00 64.62 Pass 9005.69 4278.22 9000.00 4344.73 19.96 19.40 178.60 178.39 4.500 66.55 0.00 66.55 Pass 9028.89 4277.72 9025.00 4346.69 19.52 18.95 170,21 171.40 4.500 69.77 0.00 69.77 Pass 9051.77 4277 .21 9050,00 4349.10 19.08 18.50 162.53 165.09 4.500 74.41 0.00 74.41 Pass 9074.40 4276,71 9075.00 4351.71 18.64 18.05 155.65 159,57 4,500 80.06 0.00 80.06 Pass 9096.81 4276.20 9100.00 4354,21 18.19 17.61 149.48 154.74 4.500 86.28 0,00 86.28 Pass 9118.97 4275.69 9125.00 4356.38 17.75 17.16 143.77 150.36 4.500 92.86 0.00 92,86 Pass 9140.83 4275.19 9150.00 4358.01 17,31 16.72 138.32 146.22 4.500 99.68 0.00 99.67 Pass 9162.37 4274,68 9175.00 4359.10 16.87 16.28 133.08 142.28 4.500 106,75 0.00 106.75 Pass 9183.57 4274.18 9200.00 4359.65 16.44 15,84 128.05 138.52 4.500 114.12 0.00 114.12 Pass 9204.26 4273.69 9225.00 4359.80 16.02 15.40 123.14 134.86 4.500 122,12 0.00 122.12 Pass 9224.32 4273.20 9250.00 4359.69 15.60 14,98 118.39 131.31 4.500 131.06 0.00 131.06 Pass 9243.86 4272.73 9275.00 4359.51 15,20 14.56 113.96 128.05 4.500 140,84 0.00 140.84 Pass 9262.95 4272.26 9300.00 4359.35 14.82 14,16 109.90 125.13 4.500 151.36 0.00 151.36 Pass 9281.59 4271.80 9325.00 4359.17 14.44 13.77 106.17 122.52 4.500 162.56 0.00 162.56 Pass 9300.00 4271.35 9350.00 4358,99 14.07 13.40 102,72 120,18 4.500 174.37 0.00 174.37 Pass 9317,60 4270.91 9375,00 4358.79 13.72 13.05 99.57 118.09 4.500 186.70 0.00 186.70 Pass 9334.98 4270.47 9400,00 4358.61 13.38 12.70 96.66 116.22 4,500 199,56 0,00 199.56 Pass 9350.00 4270.10 9425.00 4358,68 13.08 12.41 94.12 114.58 4.500 213.21 0,00 213,20 Pass 9368.09 4269,64 9450.00 4359,02 12.75 12.05 91.59 113.13 4.500 227.57 0.00 227,56 Pass 9383,95 4269.24 9475.00 4359.61 12.45 11.74 89.40 111.89 4.500 242.43 0.00 242.43 Pass 9400.00 4268,83 9500.00 4360.41 12.16 11.44 87.36 110.82 4.500 257.70 0.00 257,70 Pass 9414.57 4268.46 9525.00 4361.15 11.91 11.18 85.50 109.84 4.500 273,21 0.00 273.21 Pass 9429.32 4268.08 9550.00 4361.88 11.66 10.93 83,72 108.94 4.500 289.06 0.00 289.05 Pass 9443.50 4267.72 9575.00 4362.85 11.42 10.70 82.08 108.15 4,500 305.53 0.00 305.53 Pass 9457.16 4267.37 9600.00 4364.08 11.21 10.49 80,56 107.45 4.500 322.55 0.00 322.55 Pass 9470.50 4267.03 9625,00 4365.69 11.02 10.28 79.19 106.88 4.500 339,85 0.00 339.85 Pass 9483.51 4266.69 9650.00 4367.42 10.84 10.10 77.90 106.38 4.500 357.40 0.00 357.40 Pass 9500,00 4266.27 9675,00 4368.91 10,60 9.88 76.40 105.86 4.500 375,21 0,00 375.21 Pass 9508.37 4266.05 9700.00 4370,20 10.51 9,79 75.40 105.36 4.500 393.25 0.00 393,25 Pass 9520.17 4265.75 9725.00 4371.36 10.37 9.65 74.20 104.87 4.500 411.64 0.00 411,64 Pass 9531,63 4265.45 9750.00 4372.54 10.24 9.53 73.06 104.42 4.500 430.28 0.00 430.27 Pass 9550.00 4264.97 9775.00 4373.86 10.04 9.34 71,54 104.00 4.500 449.19 0.00 449.18 Pass 9550.00 4264.97 9800.00 4374.96 10.04 9.38 71.14 103.61 4.500 468.27 0.00 468.27 Pass 9563.78 4264,62 9825.00 4375.66 9.93 9.26 69,87 103.16 4.500 487.79 0.00 487.79 Pass 9573.54 4264.37 9850.00 4376.56 9.85 9.19 68.89 102,77 4,500 507.73 0.00 507.73 Pass 9582.92 4264.12 9875.00 4377.85 9.78 9.13 68,00 102.44 4.500 528.01 0.00 528.01 Pass 9600.00 4263.68 9900.00 4379.31 9.64 9.02 66.67 102.14 4,500 548.64 0,00 548,64 Pass 9600.00 4263,68 9925.00 4380.85 9,64 9.04 66.42 101.88 4.500 569,28 0,00 569.28 Pass 9609.22 4263.44 9950.00 4382,37 9.60 9.00 65.61 101.63 4.500 590.13 0.00 590.13 Pass 9617.53 4263.23 9975,00 4383.79 9.55 8.97 64.87 101.38 4.500 611.07 0.00 611.07 Pass 9625.60 4263.02 10000.00 4384.79 9.51 8.95 64.11 101.11 4.500 632.10 0.00 632.10 Pass 9633.45 4262.82 10025,00 4385.37 9.47 8.93 63.35 100.82 4.500 653.20 0.00 653.20 Pass e e Sperry-Sun Anticollision Report Company: BP Amoco Date: 10106/2003 Time: 14:53:24 Page: 6 Field: Milne Point Reference Site: MPtSPad Co-ordinate(NE) Reference: Well: MPS-01, True North Reference Well: MPS-01 Verücai (TVD) Reference: MPS-01: 72.5 Reference Wellpath: Plan MPS-01 L2 Db: Oracle Site: M PtS Pad Well: MPS-01 Rule Assigned: NOERRORS Wellpath: MPS-01L 1 V3 Inter-Site Error: 0.00 ft Reference Offset Seoù-Ml\Ïor Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H!.Ðistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 9645.76 4262.50 10050.00 4385,67 9.41 8.89 62.30 100.51 4.500 674.35 0,00 674.35 Pass 9650.78 4262.37 10075.00 4385.73 9.43 8.92 62.01 100.22 4.500 695.48 0.00 695.48 Pass 9663.63 4262.04 10100.00 4385.74 9.46 8.94 61.73 99.94 4.500 716,65 0,00 716.65 Pass 9676.48 4261.71 10125.00 4385.66 9.49 8.97 61.46 99.67 4.500 737,82 0.00 737.82 Pass 9689,33 4261.38 10150.08 4385.46 9.52 8.99 61.20 99.41 4.500 759.08 0.00 759.08 Pass 9702.25 4261.05 10175.00 4385.39 9.55 9.01 60.96 99,17 4,500 780.16 0.00 780,16 Pass 9715.49 4260.71 10200.00 4385.72 9.59 9.03 60.77 98,98 4.500 801.19 0.00 801.19 Pass 9728.87 4260.36 10225.00 4386.59 9.63 9.05 60.62 98.83 4.500 822.21 0.00 822,21 Pass 9742.18 4260.02 10250.00 4388.19 9.66 9.08 60.53 98.74 4.500 843.33 0.00 843,33 Pass 9755.45 4259.68 10275.00 4390.16 9.70 9.10 60.47 98,68 4,500 864.50 0.00 864.50 Pass 9768.75 4259,34 10300.00 4392.12 9.73 9.13 60.42 98.63 4.500 885.65 0,00 885.65 Pass 9782.09 4258.99 10325.00 4394.00 9.77 9.16 60.36 98.57 4.500 906.78 0,00 906,77 Pass 9795.47 4258.65 10350.00 4395.78 9.80 9.19 60.29 98.50 4.500 927.87 0.00 927,86 Pass 9808.86 4258.30 10375.00 4397.68 9.85 9.21 60.24 98.45 4.500 948.96 0.00 948,96 Pass 9822.22 4257.96 10400.00 4399.82 9.89 9.24 60.20 98.41 4.500 970.08 0.00 970.08 Pass 9835.57 4257.62 10425.00 4401.97 9.94 9.26 60.17 98.38 4.500 991.21 0.00 991,21 Pass 9848.93 4257.27 10450.00 4404.04 9.99 9.29 60.13 98.34 4,500 1012.33 0.00 1012.33 Pass 9862.30 4256.93 10475.00 4406.02 10.03 9.31 60.09 98.30 4.500 1033.44 0.00 1033.44 Pass 9875.66 4256.59 10500.00 4407.99 10.08 9,33 60.05 98.26 4.500 1054,56 0.00 1054.56 Pass 9889,03 4256.24 10525.00 4409,95 10,12 9.34 60.01 98.22 4.500 1075.67 0.00 1075.67 Pass 9891.70 4256.17 10530.00 4410.35 10.13 9.35 60.00 98.21 4.500 1079.90 0.00 1079.90 Pass Site: M PtS Pad Well: MPS-01 Rule Assigned: NOERRORS Wellpath: MPS-01 PB1 V7 Inter-Site Error: 0.00 ft Reference Offset Seoù-Major Axis Ctr-Ctr No-C.o Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing/H!.Ðistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 7490.03 4223.81 7525.00 4165.65 25.26 26.69 101.52 65.06 9.875 159.15 0.00 159,15 Pass 7517.50 4236.82 7550.00 4175,37 25.25 26.72 102.21 65,75 9,875 167.32 0.00 167.32 Pass 7545.24 4248.53 7575.00 4185.07 25.25 26.75 103.19 66.71 9.875 174.72 0.00 174.72 Pass 7573.06 4258.78 7600.00 4194,73 25.26 26.79 1 04.43 67.93 9.875 181.38 0.00 181.38 Pass 7600.72 4267.46 7625,00 4204.39 25.27 26.84 105.95 69.45 9.875 187.49 0.00 187.49 Pass 7627.93 4274,50 7650.00 4214.11 25.30 26.89 107.79 71.28 9.875 193.36 0.00 193.36 Pass 7654.52 4279.92 7675.00 4223.87 25.33 26.95 109.90 73.38 9.875 199.10 0.00 199.09 Pass 7680.34 4283.80 7700,00 4233.69 25.37 27.02 112,26 75.73 9.875 204.84 0.00 204.84 Pass 7705.39 4286,23 7725.00 4243.44 25.42 27.11 114.79 78.24 9.875 210.56 0.00 210.56 Pass 7729.66 4287.34 7750.00 4253.07 25.48 27.20 117.43 80.88 9.875 216,26 0,00 216.26 Pass 7751,91 4287.73 7775.00 4262.58 25.54 27.31 120,05 83.50 9.875 222.09 0,00 222.09 Pass 7774.19 4288,12 7800.00 4271.97 25,60 27.42 122.49 85.94 9.875 228.15 0.00 228.15 Pass 7796.48 4288.50 7825.00 4281.32 25.66 27.53 124,80 88.24 9.875 234.61 0.00 234.61 Pass 7818.76 4288.89 7850.00 4290.63 25.72 27.64 126.96 90.41 9.875 241 ,50 0,00 241.50 Pass 7841,03 4289.28 7875.00 4299.91 25.78 27.75 129.00 92.45 9.875 248,78 0.00 248.78 Pass 7863.30 4289.67 7900.00 4309.17 25.85 27.86 130.91 94.36 9.875 256,38 0,00 256,38 Pass 7885.61 4290.05 7925.00 4318.43 25.91 27.96 132.72 96,17 9,875 264.15 0.00 264.15 Pass 7907.94 4290.44 7950.00 4327.70 25.97 28,07 134.42 97.87 9.875 272.05 0.00 272,05 Pass 7930.31 4290.83 7975.00 4336.98 26.04 28.17 136.04 99.49 9.875 280.06 0.00 280.06 Pass 7952.78 4291.22 8000.00 4346,06 26.10 28.28 137.52 100,97 9,875 288.19 0.00 288.19 Pass 7975.41 4291.62 8025.00 4354,70 26.17 28.39 138.84 102,29 9,875 296.41 0.00 296.41 Pass 7993.16 4291.92 8050.00 4362.88 26.08 28.33 139.06 103.47 9.875 304.79 0.00 304.79 Pass 8000.00 4292,03 8075.00 4370.61 26.01 28.32 139.39 1 04.48 9.875 313.90 0.00 313.90 Pass 8022,52 4292.33 8100,00 4377.98 25.69 28.01 138.02 105.35 9.875 323.57 0.00 323.57 Pass - e Sperry-SUD Anticollision Report Company: BP Amoco Date: 10/0612003 Time: 14:53:24 Page: 7 Field: Milne Point Reference Site: M PtS Pad Co-ordinate(NE) Reference:. Well: MPS-01, True North Reference Well: MPS-01 Vertical (TVD) Reference: MPS-01: 72.5 Reference Wellpath: Plan MPS-01 L2 Db: Oracle Site: MPtSPad Well: MPS-01 Rule Assigned: NOERRORS Wellpath: MPS-01PB1 V7 Inter-Site Error: 0,00 ft Reference Offset Semi-Ml\ior Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS CasingIH!Ðistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 8036.71 4292.49 8125.00 4385.02 25.49 27.84 137.32 106.07 9.875 334.38 0.00 334.38 Pass 8050.00 4292.60 8150,00 4391.73 25.31 27.67 136.57 106.64 9.875 346.10 0.00 346.10 Pass 8063.91 4292,70 8175.00 4398.07 25,06 27.46 135.63 107.09 9.875 358.64 0.00 358.64 Pass 8077.04 4292.77 8200.00 4403.84 24.83 27.26 134.62 107.39 9.875 371.61 0.00 371.61 Pass 8089.89 4292.81 8225.00 4408,99 24.60 27.05 133.52 107.57 9.875 384.91 0.00 384,91 Pass 8100.00 4292,83 8250.00 4413.52 24.42 26.90 132.57 107.63 9.875 398.54 0.00 398,53 Pass 8114.75 4292.83 8275,00 4417.51 24.11 26.60 131.07 107.59 9,875 412.48 0.00 412.48 Pass 8126.62 4292,80 8300.00 4421.29 23.86 26.37 129,80 107.51 9.875 427.00 0.00 427.00 Pass 8138,08 4292.76 8325.00 4424.88 23.62 26.15 128.54 107.39 9,875 442.06 0.00 442.06 Pass 8150.00 4292.70 8350.00 4428.27 23.37 25.89 127,19 107.23 9.875 457.65 0,00 457.65 Pass 8159.80 4292,63 8375.00 4431.32 23.14 25,69 126,01 107.03 9.875 473.65 0.00 473.64 Pass 8174.69 4292.50 8400,00 4433.82 22.79 25,30 124,26 106,76 9.875 489.95 0,00 489.95 Pass 8183.48 4292,37 8425.00 4435.77 22.80 25.39 123.89 106.45 9.875 506.40 0.00 506.40 Pass 8202.04 4292.07 8450,00 4437.16 22.86 25.49 123,55 106,11 9.875 522.87 0.00 522.87 Pass 8220.55 4291.77 8475.00 4438.32 22.92 25.59 123.21 105.77 9.875 539.37 0.00 539.37 Pass 8238.99 4291.47 8500.00 4439.44 22.98 25,69 122.88 1 05.44 9.875 555.95 0.00 555.95 Pass 8257.36 4291.17 8525.00 4440.53 23.04 25.79 122.56 105.12 9.875 572.62 0.00 572.62 Pass 8275,67 4290.87 8550.00 4441.60 23.09 25.88 122.26 104.82 9.875 589.37 0.00 589,37 Pass 8293.98 4290.57 8575.00 4442.92 23.15 25.96 122.00 104.56 9.875 606.17 0.00 606.17 Pass 8312.31 4290.28 8600.00 4444.54 23.21 26.04 121.78 104.34 9.875 623,01 0,00 623.01 Pass 8330.64 4289.98 8625.00 4446.45 23.27 26.12 121.59 104.16 9.875 639.88 0.00 639.88 Pass 8348,97 4289.68 8650.00 4448.60 23.33 26.20 121.44 104.00 9.875 656,80 0,00 656.80 Pass 8367.21 4289.38 8675.00 4450.80 23.39 26.28 121.30 103.86 9.875 673.82 0.00 673.82 Pass 8385.36 4289.09 8700.00 4453.05 23.45 26.36 121.17 103.73 9.875 690.94 0.00 690.94 Pass 8403.42 4288.80 8725.00 4455,35 23.51 26.44 121.04 103.60 9,875 708.16 0.00 708.16 Pass 8421.39 4288.50 8750.00 4457.38 23.57 26.54 120,90 103.46 9.875 725.44 0.00 725.44 Pass 8439.29 4288.21 8775.00 4458.74 23.63 26.63 120.71 103.28 9.875 742.72 0.00 742.72 Pass 8457.38 4287.92 8800.00 4459.70 23.69 26,73 120,51 103.07 9.875 759.77 0.00 759,77 Pass 8475.78 4287,62 8825.00 4460.40 23.75 26.82 120.30 102.86 9.875 776.46 0.00 776.46 Pass 8494,27 4287.32 8850.00 4461.38 23.81 26.90 120,12 102.68 9.875 793.10 0.00 793,10 Pass 8512.76 4287.02 8875.00 4462.91 23.88 26,98 119.98 102.55 9.875 809.82 0.00 809.82 Pass 8531.24 4286.72 8900.00 4465.00 23,94 27.06 119.89 1 02.46 9,875 826.61 0.00 826.61 Pass 8549.72 4286.42 8925.00 4467.58 24.00 27.14 119,84 1 02.40 9.875 843.43 0.00 843.43 Pass 8568.33 4286.12 8950.00 4470.18 24.07 27.22 119.80 102.36 9.875 860,10 0,00 860.10 Pass 8587.04 4285.81 8975.00 4472.79 24.13 27.30 119.75 102.32 9.875 876.68 0.00 876.67 Pass 8605.65 4285.51 9000.00 4475,58 24.20 27.39 119,72 102.29 9.875 893.37 0.00 893.37 Pass 8624.16 4285,21 9025.00 4478.49 24.27 27.47 119.70 102,26 9.875 910.17 0.00 910.17 Pass 8642.75 4284.91 9050,00 4480.88 24.33 27.57 119.65 102.21 9.875 926.86 0.00 926.86 Pass 8661.47 4284,60 9075.00 4482,56 24.40 27.67 119,55 102.11 9.875 943.36 0.00 943.36 Pass 8680.32 4284.30 9100.00 4483.40 24.47 27.77 119.41 101.98 9.875 959.61 0.00 959.61 Pass 8699.26 4283.99 9125.00 4483.53 24.53 27.87 119.24 101.80 9.875 975.67 0.00 975.67 Pass 8718.18 4283.68 9150.00 4483.48 24.60 27.97 119,06 101.62 9.875 991.72 0.00 991,72 Pass 8727.61 4283.53 9175.00 4483.25 24.48 27.86 118.32 101.43 9.875 1007,82 0.00 1007,82 Pass 8736.83 4283.38 9200.00 4482.69 24.36 27.75 117.56 101.23 9.875 1023.87 0.00 1023.86 Pass 8750.00 4283.15 9225.00 4481,89 24.19 27.53 116.56 101.01 9.875 1039,85 0,00 1039.85 Pass 8750,00 4283.15 9250.00 4480.97 24.19 27.62 116.36 100.81 9,875 1055.74 0.00 1055.74 Pass 8764.09 4282.91 9275.00 4479,91 23.98 27.38 115.29 100,59 9.875 1071,64 0,00 1071.64 Pass 8772.93 4282.76 9300.00 4478.68 23.86 27.25 114.55 100.38 9.875 1087.77 0.00 1087.77 Pass 8781.84 4282.61 9325.00 4477.41 23,73 27.11 113.81 100.17 9,875 1103.56 0.00 1103.56 Pass 8800.00 4282.28 9350.00 4476.19 23.46 26.74 112.51 99.97 9.875 1118.85 0.00 1118.85 Pass 8800.00 4282.28 9375.00 4474.92 23,46 26.81 112.33 99.79 9.875 1133.58 0.00 1133.58 Pass e Sperry-SUD e Anticollision Report Company: BPAmoco Date: 1010612003 Time: 14:53:24 Page: 8 Field: Milne Point Reference Site: MPtSPad Co-ordinate(NE) Reference: Well: MPS-01, True North Reference Well: MPS-01 Vertical (TVD) Reference: MPS-01: 72.5 Reference Wellpath: Plan MPS-01 l2 Db: Oracle Site: M PtS Pad Well: MPS-Q1 Rule Assigned: NOERRORS Wellpatb: MPS-01 PB1 V7 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis .. Ctr-Ctr No-Go Allowable MD TVD MD.·· TVD Ref Offset TFO+AZI TFO-HS CasinglH!Ðistance Area Deviation Warning .. ft ft ft ft ft ft deg deg in ft ft ft 8800.00 4282.28 9400.00 4473,56 23.46 26.89 112.16 99.61 9,875 1148,21 0,00 1148.21 Pass 8818.34 4281.95 9425.00 4472.18 23.18 26.50 110.86 99.42 9.875 1162.79 0.00 1162.79 Pass 8827.31 4281.79 9450.00 4470.79 23.04 26.35 110.15 99,24 9.875 1177.59 0.00 1177.59 Pass 8850.00 4281.37 9475.00 4469.50 22.69 25.83 108.60 99.06 9.875 1192.29 0.00 1192.29 Pass 8850.00 4281,37 9500.00 4468,39 22.69 25.90 108.46 98.91 9,875 1206.33 0.00 1206.33 Pass 8850.00 4281,37 9525.00 4467.70 22.69 25.96 108.34 98.79 9.875 1220,32 0.00 1220,32 Pass 8850.00 4281,37 9550.00 4467.47 22.69 26.02 108.25 98.70 9.875 1234.37 0.00 1234.37 Pass 8872.58 4280.93 9575,00 4467.74 22.31 25.46 106.80 98.61 9.875 1248.38 0.00 1248.38 Pass 8881.39 4280,76 9600.00 4468.51 22.17 25.28 106,21 98.55 9.875 1262.91 0.00 1262.91 Pass 8900.00 4280.40 9625,00 4469.72 21.86 24,82 105.05 98.50 9.875 1277.95 0.00 1277.95 Pass 8900.00 4280.40 9650,00 4471.37 21.86 24.88 105.04 98.49 9.875 1292.70 0.00 1292.70 Pass 8900.00 4280.40 9675.00 4473.40 21.86 24.95 105.06 98.51 9.875 1306,60 0,00 1306.60 Pass Site: M PtS Pad Well: MPS-07 Rule Assigned: Major Risk Wellpath: MPS-07 V9 Inter-Site Error: 0,00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO~HS CasingIH!Ðistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 9935.65 4255.04 8100.00 4148.67 10.30 9,17 236.51 274.71 7.000 1294.53 80.11 1214.42 Pass 9934.91 4255.06 8125,00 4168.06 10.30 9,19 235.70 273.91 7.000 1277.34 80.43 1196.91 Pass 9934.13 4255.08 8150,00 4187.63 10.29 9.21 234.86 273.07 7.000 1260,62 80.76 1179.86 Pass 9933.30 4255,10 8175.00 4207.38 10.29 9.23 233,99 272.20 7.000 1244.40 81.10 1163.30 Pass 9932.44 4255.13 8200,00 4227.28 10.29 9.25 233.09 271 ,30 7.000 1228.68 81.45 1147.22 Pass 9931.61 4255.15 8225.00 4247.22 10.28 9.27 232.16 270.37 7.000 1213.32 81.82 1131.50 Pass 9930.80 4255.17 8250.00 4267.20 10,28 9.29 231.21 269.42 7,000 1198,33 82.19 1116,14 Pass 9930.02 4255.19 8275.00 4287,22 10.28 9.31 230.24 268.45 7.000 1183.72 82.57 1101.15 Pass 9929.27 4255.21 8300.00 4307.24 10.28 9.33 229.24 267.45 7.000 1169.48 82.98 1086,50 Pass 9928.57 4255.23 8325.00 4327.24 10.27 9.35 228.22 266.43 7.000 1155.57 83.39 1072.18 Pass 9927.91 4255.24 8350,00 4347.21 10.27 9.37 227.17 265.38 7.000 1141.99 83.80 1058.19 Pass 9927,30 4255,26 8375.00 4367.15 10.27 9.39 226,10 264.31 7.000 1128.77 84.22 1044.54 Pass 9926.67 4255,27 8400.00 4387.11 10.27 9.41 225.00 263.21 7,000 1115,97 84.65 1031.32 Pass 9926.00 4255.29 8425.00 4407.12 10.26 9.43 223.88 262.09 7.000 1103.66 85.08 1018.58 Pass 9925.27 4255.31 8450.00 4427.17 10.26 9.45 222.73 260.94 7.000 1091.85 85.51 1006,34 Pass 9924.49 4255.33 8475.00 4447.27 10.26 9.47 221.56 259.77 7.000 1080.56 85,94 994,62 Pass 9923.73 4255.35 8500.00 4467.42 10.25 9.49 220,35 258.56 7.000 1069.82 86.36 983.45 Pass 9923.00 4255.37 8525.00 4487.62 10.25 9.51 219.12 257.33 7.000 1059.64 86,79 972.85 Pass 9922.31 4255,39 8550.00 4507,88 10.25 9.53 217,87 256.08 7.000 1050.04 87.21 962.82 Pass 9921.65 4255.40 8575.00 4528.19 10.25 9.55 216.59 254,80 7.000 1041.03 87.63 953.40 Pass 9921 ,01 4255.42 8600.00 4548,56 10.24 9.57 215,29 253.50 7.000 1032.63 88.05 944.58 Pass 9920.39 4255.44 8625.00 4568.97 10.24 9,59 213.97 252.18 7,000 1024.86 88.46 936.40 Pass 9919,77 4255.45 8650.00 4589.40 10.24 9.60 212.63 250.84 7.000 1017.67 88.79 928.89 Pass 9919.16 4255.47 8675,00 4609.83 10.24 9.62 211.27 249.48 7,000 1011.05 89.12 921.94 Pass 9918.67 4255,48 8694.80 4626.01 10.23 9.63 210.18 248.39 7.000 1006.22 89,38 916,84 Pass J J J J J e e Per Alaska Oil and Gas Conservation Commission Regulation 20 AA 25,005 Permit to Drill sub section 14 (e) if a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface pr production casing, the applicant shall designate one branch as the primary Wellbore and include all information required under (c) of this section that is unique to that branch and need not include the $100 fee. · e TRANSMIT AL LETTER CHECKLIST CIRCLE APPROPRIATE LETTERIP ARA GRAPH S TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME I??Pt{ .5-Ó/I-2- PTD# 2L::ß -/be¡ CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL ., V/ (If API number last two (2) digits are between 60-69) "CLUE" Tbe permit is for a new wellbore segment of existing well P1P£1.- ~.,- 0 I . -6 ~ -2-3/ tlf -ÕÒ Permit NO,203-òif~1 No. 5"0 . Productionsbould continue to be reported as a function· of the original API number, stated above. HOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for tbe pilot hole must be clearly differentiated in both name (name on permit plus PH) and API Dumber (50 70/80) from records, data and logs acquired for well (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/10/02 C\jody\templates Tbe permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) assumes the liability of any protest to tbe spacing . exception that may occur. All dry ditcb sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from wbere samples are first caught and 10' sample intervals tbrough target zones. WELL PERMIT CHECKLIST Field & Pool MILNE POINT, SCHRADER BLFF OIL - 525140 Well Name: MILNE PT UNIT SB S-01L2 Program DEV Well bore seg ~ PTD#:2031690 Company BP EXPLORATION (ALASKA) INC Initial Classrrype DEV I PEND GeoArea 890 Unit 11328 On/Off Shore On Annular Disposal 0 Administration 1 PenniUeE1 attached _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ _ _ _ _ _ _l.aJE1ral:_ ootJE1qUiJE1d_p_er 20_MC 25_.Q05._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2 _LeasenumbE1r _appropriate _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 _UJliqUE1 wellnameaod Olunb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 4 WeJlJocated in_a_d_efioedpooL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 5 WeU located propE1r _distaoceJrom driJling unit boundary_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 6 WeUlocated propE1rdistançeJrom other wells_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 7 _S_uffícient acreage_aYailable in_dJilJiog unit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 8 Jfdeviated. isweJlborE1 plaUncJuded _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 9 _Ope(ator only affected party _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 100pe(ator has_appropriate_bond iJlJorce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 11 Permit GaO be issued without coMervaJion ordE1r _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ YeL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Appr Date 12 Eer:mitGaO be issued without admini!¡t(atille_apprpvaJ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SFD 10/8/2003 13 _C_ao permitbe approved bE1fore _15-day_ wajt _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 14 WellJocated within area and_strata authorized byJojectioo Order # (putiO# in_cPmmeotsUFQr_ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 15 _AJI welJswithinJI431Jile_area_of review ideotified (FpUiervicewell only>- _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 16 PJE1-produ_cediojector; duratioRofpre-productioolessthan_3months(ForselYicewellonJy) _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ 17 ACMPFïndjng9fCon$isteocy_haS bE1eJljssUE1dJorJhis prolect _ _ _ _ _ _ _ _ _ _NA _ _l.a_teralfrom_existingwelJ,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 18 _C90du_ctor!¡tringpJovided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _Con_ductorwassetjnmotherÞore._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ 19 _S_urfacecasingprQtecJs.aILknownUSDWs _ . _ _ _ _ _. .. _ _ _ _ _ _ _ NA. _ _ _ _ _ _,6.llaquifersexempted 40 Cfß:l47,1021b)(3) _ _ _ _. _ ...... _ _ _ _ _...... _ _ _ ....._ 20 _CMTvoladeQu_ateJocirc.ulate.oJl_cond_uctor.&!¡urtCSg _.... _ _ _ _ _ _ _. Yes_ _ _ _.. .Surta~çasiJlginmotherborewa!¡cementedto_s_urfac.e, _ _ _ _ _...... _ _ _ _ ...... _ _ _ _..... _ __ 21CMT vol adeQuateJo tie-in long $triog to_sur:f csg. . . _ _ _ _ _ . . . . . _ _ _ _ _ . . . . _ _ _ _ No . . _ _ _ _ _ Z -518" produçtjoJl.casing wa_s _not cemeoted tosur:face._ CemenJed_satisfactorily,. . _ _ _ _ _ . . . . . _ _ _ _ . 22 _CMTwill coyer_aU kOQwnpro.duçtiye bQrizons_ _ _ _ _ . _ . . . . _ _ _ _ _ . _ . . . . _ _ _ _ . . . . No_ _ _ _ _ . . . SloUedJiOE1r plaooe_d, _ _ _ _ . _ _ _ _ _ _ . . . . _ _ _ _ _ . . . . . . _ _ _ _ _ _ . _ _ _ _ _ . . . . _ _ _ _ 23 _Casiog de.si.gos adeQuate for C.T4 B_&_permafrost . . . _ _ _ _ _ . . . . . . . _ _ _ _ . . . . . Yes _ ...... _ _ _ _ . . . . . _ _ _ _ . . . . . . . . _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . . _ _ _ _ _ . . . . . . _ _ _ _ _ _ . . . . _ _ _ 24 Adequate.tan.kage_orre_selYepit.. _ _ _ _ _.... _ _ _ _. _.... _ _... Yes.. _ _ _ _ _ßigise.quippe_dwithsteel_plÌ!¡._NQreseJllepjtplaooed, All wa!¡teto_Class Jlw.elJ(s), _ _....... _ _ _ _. 25 Jtare-dríll4has_a10-403fQrabandonmentbeeoapproved _ _..... _ _ _. _.... _ _ NA..... _ _l.aJeralfrom.existlngwelJ..NQr:>&AinvoJved._... _ _ _ _....... _ _ _ _ _....... _ _ _. _.... _ _ __ 26 Adequatewellbore separatioJlpropo!¡ed _ _ _ . . . . _ _ _ _ . . . . . . _ _ _ _ _ _ . . Yes _ . \ o bazardsideotifiecLNearest weJI!¡ are themQther bore aod fir!¡t Ja_teral. _... _ _ _ _ _ _ . 27 Jtdiverter req.uired, does itmeet reguJations. . . _ _ _ _ . . . . _ _ _ _ _ _ . . . . . . . _ _ .... NA _ _ _ . _ _ . . . _ _ _ _ . . . . . _ _ _ _ _ . _ . . . . . . _ _ _ _ _ . . . _ _ _ _ _ _ _ . . . . . _ _ _ _ _ . . . . . . _ _ _ _ _ . . . . . . _ 28 DrilJiog fluid. program schematic.&equiplistadequate_ . _ . _ _ _ _ _ _ .... _ _ _ _ . . . Yes _ _ _ _ _ _ . Maxjmum BHP 8.2_EMW._ Planned mud weigbt9.5ppg. _ _ _ _ _ _ . . . . . _ _ _ _ _ _ . . . . . . _ _ _ _ _ . 29 _BQPEs._dojhey meetreguJation _ . . . . . _ _ _ _ . . . . . _ _ _ . . . . . . _ _ _ _ _ _ . _ _ _ Yes. . . . . _ _ _ _ _ _ . . . _ _ _ _ _ . . . . . _ _ _ _ _ _ . . _ _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . . _ _ _ _ _ 30 BQPEwess raJiog appropriate; JesHo_(pu_t p!¡ig in.commeoÌ!¡). . . . _ _ _ _ _ . . . . . _ _ _ _ . . Yes _ _ _ _ _ _ . CalçuJaJed_MASP. 1379 P!¡í._ Plaon_ed ßOP.test pressure.3.50Q psJ._ _ . . . . . . _ _ _ _ . . . . . . . _ _ _ _ _ . . . . _ 31C_hokemanjfold compJies w/APIR~-53 (May 84)_ _ _ _ _ _ . . _ _ _ _ Yes _ _ _ _ . . . . . _ _ _ _ .... _ _ _ _ _ _ _ . . . . . _ _ _ _ _ _ . . . . . _ _ _ _ _ . . . . . . _ _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . _ _ _ 32 WQrk will occur withoutoperation _sbutdow.n. . . _ _ _ _ _ . . . . . _ _ _ _ _ _ . . . . . _ _ _ _ . . . Yes _ _ _ _ . . . . . . . _ _ _ _ . . . _ _ _ _ _ . _ . . . . . _ . _ _ . . _ _ _ _ _ _ . . . . . _ _ _ _ _ _ _ . . . . . _ _ _ _ _ . . . . . _ _ 33 Js preseoçe of H2S gas_ prob.able. _ _ _ _ _ . . . _ _ _ _ . . . . _ _ _ _ _ _ . _ _ _ . . _ _ _ _ . No. _ _ _ _ _ _ . . . _ _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . . . _ _ _ _ _ . . . . _ _ _ _ _ _ . . . . . _ _ _ _ _ _ . . _ _ _ _ _ . . . . . . _ _ 34 Mecha.nlcaLq)J')djtioo pf wells wtthio ,6.0ß YE1rified (for.s_ervice welJ only) _ _ _ _ _ . . . . . . _ _ _ NA . . . . _ _ _ _ _ _ . . . _ . _ _ _ _ . . . . _ _ _ _ _ _ . . . . . . _ _ _ _ . . . . . . . _ _ _ _ _ . . . . . . . _ _ _ _ . _ . . . . _ _ Engineering Appr Date TEM 10/8/2003 61,?JJ. t'1:è( Geology Appr SFD Date 10/8/2003 Geologic Commissioner: Dt-~ '7 - e 35 Permit GaO be issued wlQ hyd(ogen. s.ulfide measures. . . . _ _ . . . . . . . . _ _ _ _. _ _ . . _ Yes _ _ _ . . . . _ _ _ _ _ _ . . _ . _ _ _ _ . . . . _ _ _ _ _ _ _ _ . . . . _ _ _ _ _ . . . . . _ _ _ _ _ _ . _ . _ _ _ _ _ . . . . . _ _ _ _ _ 36 D.ata_preseoted on. QOte_ntial overpressure _zooes. . . . . . . _ _ _ _ _ _ _ _ Yes. _ _ _ _ _ . Expeçted_ rese/'\{oir pressure is B,35 ppg EMW; will be drHled with_ 9.5 ppg.mud. _ _ _ _ _ . . . . _ _ _ _ _ . . . . _ _ _ 37 _S_eismlcanalysJs. of sbaJlow gas.zooes_ _ . . . . _ _ _ . . . . . _ _ _ _ . . . . . . . _ _ _ _ NA _ _ _ . . . . . _ _ _ _ _ . . _ _ _ _ _ _ . . . _ _ _ _ . . . . . . . _ _ _ _ . _ . _ _ _ _ _ _ _ . . . . . _ 38 Seabed .coodjtipo survey Jif off-shpre) _ _ _ _ . _ _ . . . . . _ _ _ _ . . . . . . _ _ _ _ _ . NA . _ _ _ _ _ _ . . . _ _ _ _ _ . . _ _ _ _ _ _ . . . . . . _ _ _ _ _ _ _ _ _ . . . . . . _ _ _ _ _ _ . . . . _ _ _ _ _ . . . . . . _ 39 _ Contact namelphooeJor.weekly progress reports [exploratory 901y] . _ _ _ _ . . . . . _ _ _ NA . . . . . _ _ _ _ _ _ . _ . . _ _ _ _ . . _ _ _ _ . _ _ _ . . . . . _ _ _ _ _ _ . . _ _ _ _ . _ . . . . . _ _ _ _ . Date: Engineering Date co:~~~oner ~;;; t:¡ / u:z... ¡Of 1-13 Co~'" -if VI 1'---- ~ e . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX, No special effort has been made to chronologically organize this category of information. , Sperry-Sun DrtlÞing Services LIS Scan Utility e . ( ~ 10 )_ \ \0 . t~S)--\ $Revision: 3 $ LisLib $Revision: 4 $ Tue Mar 30 13:50:51 2004 Reel Header Service name..... . . . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/03/30 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name.. ............. . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date.................... .04/03/30 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-01 L2 PB1 500292314171 B. P. Exploration (Alaska) Inc Sperry-Sun Drilling Services 30-MAR-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0002714264 J. STRAHAN D. FERGUSON MWD RUN 9 MW0002714264 C. A. DEMOSK C. DIXON MWD RUN 10 MW0002714264 C.A. DEMOSKI C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 7 12N 11E 3375 4714 71.90 38.30 # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.125 7.625 7487.0 # REMARKS: e e 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL WAS EFFECTED BY DRILLING OFF OF A WHIPSTOCK POSITIONED WITHIN THE RUN 4 INTERVAL OF MPS-01, THE TOP WAS AT 7487'MD/4222'TVD AND THE BOTTOM WAS AT 7499'MD/4228'TVD. 4. MWD RUNS 9 AND 10 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AT-BIT INCLINATION (ABI); AND PRESSURE WHILE DRILLING (PWD). AS MWD RUN 9 WAS TO POSITION THE WHIPSTOCK (AND THE EWR SENSORS DID NOT EXIT THE CASING), ONLY SROP AND SGRC DATA ARE PRESENTED FOR THIS RUN. 5. LOG AND DIGITAL DATA (LDWG) ONLY WERE BLOCK-SHIFTED 1.5' DOWNHOLE, PER E-MAIL FROM K. COONEY (SIS/BP) DATED 16 MARCH 2004. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. 6. MWD RUNS 4 (PART), 9 AND 10 REPRESENT WELL MPS-01 L2 PB1 WITH API#: 50-029-23141-71. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10393'MD/ 4223'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/30 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 # FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX ROP $ START &H 7301.5 7463.5 7463.5 7463.5 7463.5 7463.5 7489.0 STOP DEPTH 10339.0 10346.0 10346.0 10346.0 10346.0 10346.0 10394.5 e # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH 7301.5 10394.5 $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ # REMARKS: GR 7300.0 10393.0 BIT RUN NO 4 9 10 MERGED MAIN PASS. $ MERGE TOP 7300.0 7425.0 7447.5 MERGE BASE 7424.5 7510.0 10393.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record.. . . . . . . . . . . . Undefined Absent value.................... ..-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 Name DEPT ROP GR RPX RPS RPM RPD FET Service Unit FT FT/H API OHMM OHMM OHMM OHMM HOUR MWD MWD MWD MWD MWD MWD MWD Min 7301.5 0.5 26.77 0.16 0.16 0.12 0.04 0.2 Max 10394.5 464.37 113.05 1753.15 1535.98 2000 2000 4656.99 Mean 8848 150.474 74.9724 9.2712 11.0479 16.8503 21.7145 42.1962 First Reading For Entire File......... .7301.5 Last Reading For Entire File.......... .10394.5 Nsam 6187 5812 6076 5766 5766 5766 5766 5766 First Reading 7301.5 7489 7301.5 7463.5 7463.5 7463.5 7463.5 7463.5 Last Reading 10394.5 10394.5 10339 10346 10346 10346 10346 10346 e File Trailer Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/30 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/30 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR $ 2 e header data for each bit run in separate files. 4 .5000 START DEPTH 7300.0 STOP DEPTH 7424.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: 05-APR-03 Insite 66.37 Memory 7487.0 7300.0 7487.0 58.1 84.8 TOOL NUMBER 126027 9.875 3140.0 LSND 9.55 57.0 10.5 1200 5.6 4.100 2.930 64.0 92.4 MUD FILTRATE AT MT~ MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value............. ........ .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT GR MWD040 4.700 3.000 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 API 4 1 68 4 2 Name Service Unit DEPT FT GR MWD040 API Min 7300 37.66 Max 7424.5 97.83 Mean 7362.25 69.8168 First Reading For Entire File......... .7300 Last Reading For Entire File.......... .7424.5 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .04/03/30 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .04/03/30 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Nsam 250 250 .0 68.0 First Reading 7300 7300 Last Reading 7424.5 7424.5 header da_for 9 .5000 each bit run in separate ftltS. Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ START DEPTH 7425.0 7487.5 STOP DEPTH 7447.0 7510.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 15-0CT-03 Insite 66.37 Memory 7510.0 7487.0 7510.0 TOOL NUMBER 184054 6.125 3140.0 FLO-PRO 9.50 55.0 9.5 65000 4.4 .000 .000 .000 .000 .0 71.2 .0 .0 e e Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD090 FT/H 4 1 68 4 2 GR MWD090 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7425 7510 7467.5 171 7425 7510 ROP MWD090 FT/H 1 52.92 19.0172 46 7487.5 7510 GR MWD090 API 36.35 51.72 44.4553 45 7425 7447 First Reading For Entire File......... .7425 Last Reading For Entire File.......... .7510 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/30 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/30 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 4 header data for each bit run in separate files. 10 .5000 START DEPTH 7447.5 7462.0 7462.0 7462.0 7462.0 7462.0 7510.5 STOP DEPTH 10337.5 10344.5 10344.5 10344.5 10344.5 10344.5 10393.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): 16-0CT-03 Insite 66.37 Memory 10393.0 7510.0 BOTTOM LOG INTERVAL (FT)4IÞ BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing................... ..60 .1IN Max frames per record........... ..Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 10393.0 59.7 96.3 TOOL NUMBER 184054 159436 6.125 7499.0 FLO PRO 9.50 55.0 7.5 80000 3.8 .280 .200 .540 .260 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD100 FT/H 4 1 68 4 2 GR MWD100 API 4 1 68 8 3 RPX MWD100 OHMM 4 1 68 12 4 RPS MWD100 OHMM 4 1 68 16 5 RPM MWD100 OHMM 4 1 68 20 6 RPD MWD100 OHMM 4 1 68 24 7 FET MWD100 HOUR 4 1 68 28 8 Name Service Unit DEPT FT ROP MWD100 FT/H Min 7447.5 0.5 Max 10393 464.37 Mean 8920.25 151. 523 Nsam 5892 5766 e 66.0 93.5 66.0 66.0 First Reading 7447.5 7510.5 Last Reading 10393 10393 GR MWD100 API 26.7_ 113.05 75.4329 5781 -7447.5 10337.5 RPX MWD100 OHMM 0.16 1753.15 9.2712 5766 7462 10344.5 RPS MWD100 OHMM 0.16 1535.98 11.0479 5766 7462 10344.5 RPM MWD100 OHMM 0.12 2000 16.8503 5766 7462 10344.5 RPD MWD100 OHMM 0.04 2000 21.7145 5766 7462 10344.5 FET MWD100 HOUR 0.2 4656.99 42.1962 5766 7462 10344.5 First Reading For Entire File......... .7447.5 Last Reading For Entire File.......... .10393 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/30 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF Tape Trailer Service name....... . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/03/30 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... .UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name........... . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/03/30 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Dr~ing Services LIS Scan Utility e dâ.3 -/G7 $Revision: 3 $ LisLib $Revision: 4 $ Wed Mar 31 08:52:05 2004 \1r» Reel Header Service name............ .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 04/03/3 1 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date.................... .04/03/31 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPS-Ol L2 500292314161 B. P. Exploration (Alaska) Inc Sperry-Sun Drilling Services 30-MAR-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0002714264 J. STRAHAN D. FERGUSON MWD RUN 9 MW0002714264 C.A. DEMOSKI C. DIXON MWD RUN 10 MW0002714264 C.A. DEMOSKI C. DIXON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 11 MW0002714264 C.A. DEMOSKI C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 7 12N lIE 3375 4714 71.90 38.30 # WELL CASING RECORD OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT ~ (IN) SIZE (IN) DEPTH (FT) 6.125 7.625 7487.0 e # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MPS-01 L2 IS AN OPEN-HOLE SIDETRACK WITHIN THE RUN 10 INTERVAL OF MPS-01 L2 PB1, EXITING AT 9968'MD/4252'TVD. 4. MWD RUNS 9 - 11 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AT-BIT INCLINATION (ABI); AND PRESSURE WHILE DRILLING (PWD). AS MWD RUN 9 WAS TO POSITION THE WHIPSTOCK (AND THE EWR SENSORS DID NOT EXIT THE CASING), ONLY SROP AND SGRC DATA ARE PRESENTED FOR THIS RUN. RUN 4 SGRC DATA ARE INCLUDED FOR CORRELATION PURPOSES. 5. LOG AND DIGITAL DATA (LDWG) ONLY WERE BLOCK-SHIFTED 1.5' DOWNHOLE, PER E-MAIL FROM K. COONEY (SIS/BP) DATED 16 MARCH 2004. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. 6. MWD RUNS 4 (PART), 9 - 11 REPRESENT WELL MPS-01 L2 PB1 WITH API#: 50-029-23141-61. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11075'MD/ 4243'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX ROP $ 1 e e and clipped curves¡ all bit runs merged. .5000 START DEPTH 7301.5 7463.5 7463.5 7463.5 7463.5 7463.5 7489.0 STOP DEPTH 11021.0 11028.0 11028.0 11028.0 11028.0 11028.0 11076.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH 7301.5 11076.5 $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ # REMARKS: GR 7300.0 11075.0 BIT RUN NO 4 9 10 11 MERGED MAIN PASS. $ MERGE TOP 7300.0 7425.0 7447.5 9968.5 MERGE BASE 7424.5 7510.0 9968.0 11075.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction... ............. . Down Optical log depth units.......... .Feet Data Reference Point............ ..Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7301.5 11076.5 9189 7551 7301.5 11076.5 ROP MWD FT/H 0.5 464.37 162.711 7176 7489 11076.5 GR MWD API 26.77 119.54 73.4457 7440 7301.5 11021 RPX MWD OHMM 0.16 1753.15 9.57064 7130 7463.5 11028 RPS MWD OHMM 0.16 1535.98 11.1998 7130 7463.5 11028 RPM MWD OHMM 0.12 2000 15.9334 7130 7463.5 11028 RPD MWD OHMM 0.04 2000 19.8907 7130 7463.5 11028 FET MWD HOUR 0.1_ 4656.99 34.2048 7130 -7463.5 11028 First Reading For Entire File......... .7301.5 Last Reading For Entire File.......... .11076.5 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type........... . . . . .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR $ 2 header data for each bit run in separate files. 4 .5000 START DEPTH 7300.0 STOP DEPTH 7424.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 05-APR-03 Insite 66.37 Memory 7487.0 7300.0 7487.0 58.1 84.8 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY TOOL NUMBER 126027 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 9.875 3140.0 # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): LSND 9.55 e MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 57.0 10.5 1200 5.6 4.100 2.930 4.700 3.000 Name Service Order DEPT GR MWD040 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 API 4 1 68 4 2 Name Service Unit DEPT FT GR MWD040 API Min 7300 37.66 Max 7424.5 97.83 First Reading For Entire File......... .7300 Last Reading For Entire File.......... .7424.5 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 Mean 7362.25 69.8168 Nsam 250 250 e 64.0 92.4 68.0 68.0 First Reading 7300 7300 Last Reading 7424.5 7424.5 File Type.......... . . . . .~ Previous File Name..... ..STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 3 e header data for each bit run in separate files. 9 .5000 START DEPTH 7425.0 7487.5 STOP DEPTH 7447.0 7510.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB!G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down 15-0CT-03 Insite 66.37 Memory 7510.0 7487.0 7510.0 .0 .0 TOOL NUMBER 184054 6.125 3140.0 FLO-PRO 9.50 55.0 9.5 65000 4.4 .000 .000 .000 .000 .0 71.2 .0 .0 e Optical log depth units.4IÞ....... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name DEPT ROP GR Service Order Nsam 1 1 1 Units FT FT/H API Size 4 4 4 MWD090 MWD090 Rep 68 68 68 Code Channel 1 2 3 Offset o 4 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7425 7510 7467.5 171 7425 7510 ROP MWD090 FT/H 1 52.92 19.0172 46 7487.5 7510 GR MWD090 API 36.35 51.72 44.4553 45 7425 7447 First Reading For Entire File......... .7425 Last Reading For Entire File.......... .7510 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR FET RPD RPM RPS RPX ROP $ 4 header data for each bit run in separate files. 10 .5000 START DEPTH 7447.5 7462.0 7462.0 7462.0 7462.0 7462.0 7510.5 # LOG HEADER DATA STOP DEPTH 9968.0 9968.0 9968.0 9968.0 9968.0 9968.0 9968.0 e DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............ ..Undefined Frame Spacing................... ..60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 18-0CT-03 e Insite 66.37 Memory 9968.0 7510.0 9968.0 59.7 96.3 TOOL NUMBER 184054 159436 13.500 7499.0 FLO PRO 9.50 55.0 7.5 80000 3.8 .280 .200 .540 .260 66.0 93.5 66.0 66.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD100 FT/H 4 1 68 4 2 GR MWD100 API 4 1 68 8 3 RPX MWD100 OHMM 4 1 68 12 4 RPS MWD100 OHMM 4 1 68 16 5 RPM MWD100 OHMM 4 1 68 20 6 RPD MWD100 OHMM 4 1 68 24 7 FET MWD100 HOUR 4 1 68 28 8 e e First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7447.5 9968 8707.75 5042 7447.5 9968 ROP MWD100 FT/H 0.5 464.37 147.196 4916 7510.5 9968 GR MWD100 API 26.77 106.61 74.3808 5042 7447.5 9968 RPX MWD100 OHMM 0.16 1753.15 9.62749 5013 7462 9968 RPS MWD100 OHMM 0.16 1535.98 11.4223 5013 7462 9968 RPM MWD100 OHMM 0.12 2000 17.8253 5013 7462 9968 RPD MWD100 OHMM 0.04 2000 23.3758 5013 7462 9968 FET MWD100 HOUR 0.2 4656.99 48.4446 5013 7462 9968 First Reading For Entire File......... .7447.5 Last Reading For Entire File.......... .9968 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type........ . . . . . . . .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type.......... . . . . . .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX GR ROP FET $ 5 header data for each bit run in separate files. 11 .5000 START DEPTH 9968.5 9968.5 9968.5 9968.5 9968.5 9968.5 9968.5 STOP DEPTH 11026.5 11026.5 11026.5 11026.5 11019.5 11075.0 11026.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): 18-0CT-03 Insite 66.37 Memory 11075.0 9968.0 BOTTOM LOG INTERVAL (FT)~ BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction............... ..Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 11075.0 87.2 91. 7 TOOL NUMBER 184054 159436 13.500 7499.0 FLO PRO 9.50 51. 0 8.5 65000 5.2 .220 .160 .240 .200 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD110 FT/H 4 1 68 4 2 GR MWD 11 0 API 4 1 68 8 3 RPX MWD 11 0 OHMM 4 1 68 12 4 RPS MWD110 OHMM 4 1 68 16 5 RPM MWD110 OHMM 4 1 68 20 6 RPD MWD 11 0 OHMM 4 1 68 24 7 FET MWD 11 0 HOUR 4 1 68 28 8 Name Service unit DEPT FT ROP MWD110 FT/H Min 9968.5 4.93 Max 11075 340.37 Mean 10521.8 200.145 Nsam 2214 2214 e 65.0 93.5 65.0 65.0 First Reading 9968.5 9968.5 Last Reading 11075 11075 GR MWD 11 0 API 41.9_ 119.54 72.2556 2103 -9968.5 11019.5 RPX MWD 11 0 OHMM 3.11 613.88 9.43601 2117 9968.5 11026.5 RPS MWD 11 0 OHMM 4.14 44.74 10.6728 2117 9968.5 11026.5 RPM MWD110 OHMM 5.26 41.09 11.4534 2117 9968.5 11026.5 RPD MWD110 OHMM 6.23 29.84 11.6381 2117 9968.5 11026.5 FET MWD110 HOUR 0.18 1. 61 0.485295 2117 9968.5 11026.5 First Reading For Entire File......... .9968.5 Last Reading For Entire File.......... .11075 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/31 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.006 Physical EOF Tape Trailer Service name............ .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 04/03/31 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name....... . . . . . .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/03/31 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name..... . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File