Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
;{ð.3- ~. 'J 3 Well History File Identifier
D Two-sided 1111111111111111111
Production Scanning
Stage 1 Page Count from Scanned File: 1'-f (CO"", does Incl"de)?'e' sheet)
Page Count Matches Number in sca.nn~g PI. epa~ation: V YES
BY: ~ Date: II if, oft;
Stage 1 If NO in stage 1, page(s) discrepancies were found:
Organizing (done)
RESCAN
~olor Items:
D Greyscale Items:
DIGITAL DATA
D Diskettes, No.
D Other, No/Type:
D Poor Quality Originals:
D Other:
NOTES:
Date I J If/of;;
Date 1/4-1 D0
º' X 30 = & ()
Date I J 4-10&
BY:
~
(, lVIar!!l)
Project Proofing
BY:
~
Scanning Preparation
BY: ~
BY:
Maria
Date:
Scanning is complete at this point unless rescanning is required.
ReScanned
BY:
Maria
Date:
Comments about this file:
D Rescan Needed 1111111111111111111
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
D Logs of various kinds:
D Other::
/s/
mf
11111111111111 I11I1
/s/
rnp
+ 1<.3 = TOTAL PAGES '13
(Co"nt does not '~~"de co.., shlet) rnp
1111111111111111111
NO
V11P
/s/
YES
NO
/s/
1111111111111111111
1111111111111111111
/s/
Quality Checked
11/1111111111111111
10/6/2005 Well History File Cover Page.doc
•
MICROFILMED
03/01/2008
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
ri~ .
F:~LaserFiche\CvrPgs_Inserts~Microfilm Marker.doc
203-173
.
.
Subject: 203-173
Date: Thu, 30 Oct 2003 10:36:39 -0900
From: tom _ maunder@admin.state.ak.us
To: Jody J Colombie <jody_colombie@admin.state.ak.us>
Jody,
Enclosed is the proposed letter for Pelican Hills next well. On the
original well, Pelican Hill gave approval to give the permit to Arlen.
Could you please finalize??
Thanks
Tom
-
~1
Œj
Name: 1 203-172.doc
203-172.doc Type: WINWORD File (application/msword)
! Encoding: base64
.J
1 of 1
10/30/200310:41 AM
.
mJ} !Æ~!Æ~ !Æ
.
AlfASKA. OIL AND GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE. SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Mr. Al Gross
Pelican Hill Oil and Gas Inc.
1401 N. El Camino Real, Suite 207
San Clemente, CA 92672
Mr. Arlen Ehm
2420 Foxhall Drive
Anchorage, AK 99504
Re: Iliamna No.2
Pelican Hill Oil and Gas Inc.
Permit No: 203-173
Surface Location: 1710' FNL, 187' FWL, Sec. 29, T9N, R14E, SM
Bottomhole Location: 1710' FNL, 187' FWL, Sec. 29, T9N, R14E, SM
Dear Messrs. Gross and Ehm:
Enclosed is the approved application for permit to drill the above referenced exploration well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
On page 3 of the application, Pelican Hill requests waivers to 11 Commission requirements.
Similar requests were evaluated for the Illiamna #1 (203-172) and were granted to drill that well.
The approvals are valid for this well.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's petroleum field inspector at 659-3607 (pager).
Sincerely,
~ ~cL~
Randy ¡¿edrich
Commissioner
BY ORDER OF THE COMMISSION
DATED thid.? day of October, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
.
.
/Æ/
ARLEN EHM
Geological Consultant
AAPG Certified Petroleum Geologist
Certification #2503
2420 Foxhall Drive
Anchorage, AK 99504
Phone: 907-333-8880 * Fax: 907-333-3454
E-mail: arlenehm@gci.net
October 10, 2003
Ms. Sarah Palin, Chairman
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Drilling Permit
Pelican Hill Oil and Gas Iliamna No.2
Dear Ms. Palin:
Attached is an application for a drilling permit and a plan of engineering covering those
operations. Also included is a Plan of Operations that was filed with the Division of Oil and
Gas. For your information, we are also filing a nearly identical application for Iliamna No.1,
which is within the same prospect area.
Application for permits has also been made to other pertinent state, borough and federal
agencIes.
As all of the industry is aware, Governor Murkowski is in the process of streamlining the
permitting process for oil and gas projects. The Governor recently asked Pelican Hill to keep
him apprised of all correspondence to state agencies relative to the obtaining of permits.
Therefore we are providing his office with a complete set of pertinent permit applications.
Sincerely,
~~
Arlen Ehm
Geological Consultant
Cc: Governor Murkowski
Al Gross, Pelican Hill Oil and Gas
RECEIVED
1 0
Enc.
& Gas Cons. Comcm;;swn
Anchor<i¡¡c
OR\G\NAL
L
.
e
ÅO(7,Ò
1 a. Type of work Drill X Redrill 0
Re-entry 0 Deepen 0
2. Name of Operator
Pelican Hill Oil and Gas Inc.
3. Address 1401 N. EI Camino Real, Suite 207
San Clemente, CA 92672
4. Location of well at surface
187' FWL & 1710' FNL
Sec.29 -T9N-R14W
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 MC 25.005
1b. Type of well Exploratory X Stratigraphic Test 0 Development Oil 0
Service 0 Development Gas 0 Single Zone 0 Multiple Zone 0
5. Datum Elevation (OF or KB) 10. Field and Pool
46.5 Feet
6. Property Designation
ADL 388133-1
7. Unit or Property Name
lIiamna
8. Well Number
2
9", ðAAfoximate spud date
~r5,2003
14. Number of acres in property
None
11. Type Bond (see 20AAC25.025)
Irrevocable letter of credit to
be supplied
At total depth
Same
12. Distance to nearest
property line
2,500' 2,640'
16. To be completed for deviated wells
Kickoff depth feet Maximum hole angle 0
18. Casing
program size Specifications
Hole Casin Weight Grade Coupling
g
13 3/8"
9 5/8"
51/Z'
13. Distance to nearest well
Amount
$200,000
15 Proposed depth (MD and TVD)
Length
4,400 5,500 MD 5,500 TVD
17. Anticipated pressure (see 20 AAC 25.035 (e)(2)
Maximum Surface )Þ18"'PS¡g. At total depth (TVD) 2574 psig
Setting Depth ~O ~'1. f.-9-~fl4
Top Bottom Quantity of cement
TVD MD TVD
MD
143/4"
121/4"
77/8"
54.40#
32.30#
15.5
R-3
H-40
JSS
Buttress
Buttress
Buttress
60'
SSO'
5,500'
0'
0'
0'
0' 80' 80' 18sx=20CF
0' 550' 550' 192 sxs = 283 CF
0' 5,500' 5,500' TBD Based on top of Shows. Plan is
for 191 sxs Lead + 149 sxs Tail =
347 CF Lead + 173 CF Tail
0' 5,500' 5,500' None
5-1/2" 27/8" 6.50# K-55 EUE 8Rd 5,500' 0'
Csg
19, To be completed for Redrill. Re-entry and Deepen Operations
Present well condition summary
('
'-'"
1 0
20. Attachments: Filing Fee X Property Plat X
X
:'\1
BOP Sketch X Diverter Sketch X Àn(mr:i"um-~ Program W/Exceptions
Drilling Fluid Program X Time vs Depth Plot X 20MC25.050 Requirements X
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~'? ~ Title: Geological Consultant Date /1)- / IJ -0 J
Commission Use Only
Permit Number 7:< I API Number I Approva] dJ~~ ""'J.. I S.ee cover.lette. r
203.... 170 50- /33- ~5ZS ~óO /d¡.!i?- '!JJ for otherrequirements
Conditions of approval Samples requi.!J;d 0 Yes .¥No Mud log required )(Y '*'0 No -it' Þ~.ft!--. .fr~.'f« el-F.LfrtY1. \/~. C-Ý.,-il¡
Hydrogen Sulfide measures 0 Yes ~No Directional Survey required þ!1 Yesfm No .';(()f. I.t\L'."~~~:/,'::'tJ~1~!~:/.: ¡$Ä
Required working pressure for BOPE 02M 03M 05M 010M 015M :f' ,.-J
Other: ~oaO ~\ 'bO\=> ~..ð\- _ / by order of /~ ~ I '\
Approved by f f.. ...A ~ '- ~ Commissioner the commission Date / t/ 'J' ~ '¿j.....)
/ '" Su it in riplicate
ORtG'~"LAi"
-
..,
~
.,
~
19
20
R R
15 14
W W
1
1710'
ILlAMNA 2 ~
(SET 5/8" REBAR)
187'-
30
29
SCALE: 1" = 2000'
25
36
31
32
Units:U.S. Survey Feet
Horizontal Datum:NAD 27
Coordinate System:State Plane; Zone 4
Vertical Datum:NAVD 88
Horizontal locations are based on the NGS published coordinates for KUST AT AN RESET
of (N2459539.34, E186278.03)
Elevations were generated using RINEX data from CORS Stations TLKA (Talkeetna
CORS ARP) and KEN1(Niki USCG B); ELEVATIONS ARE +/- 5'
SECTION LINES ARE DRAWN USING PROTRACTED COORDINATES.
R
15
W
R
14
W
T9N
T8N
Well Name Northing Easting Elev
ILlAMNA 2 2505045.97 176985.35 46.53
6
, F. Robert
1-
1]_-
~ ffi~~rnœo
LOCA TION OF
PELICAN HILL OIL & GAS INC. WELL LOCATION FOR ILlAMNA 2
SEC. 29, T 9 N, R 14 W, S.M., AK
"'~
ENGINEERS AND LAND SURVEYORS
PREPARED FOR:
PELICAN HILL OIL AND GAS INC.
DRAWN BY: JZW
CHECKED BY: CBS
JOB NUMBER:
2003-510
801 WEST FIREWEED LANE SUITE 201
ANCHORAGE. ALASKA 99503-1801
CNE (907)-274-5257
SCALE:
1" = 2000'
j
./
".
.
~
~
r
í 9
20
R R
15 14
W W
t
1710'
ILlAMNA 2 1-_1
(SET 5/8" REBAR)
187'-
30
29
SCALE: 1" = 2000'
25
36
3í
32
Well Name Northing Easting Elev
ILlAMNA 2 2504813.31 1317008.09 46.53
R
15
W
R
14
W
T9N
TaN
Units:U.S. Survey Feet
Horizontal Datum:NAD 83
Coordinate System:State Plane; Zone 4
Vertical Datum:NAVD 88
Horizontal locations are based on the NGS published coordinates for KUSTATAN RESET
of (N2459304.37, E1326298.47)
Elevations were generated using RINEX data from CORS Stations TLKA (Talkeetna
CORS ARP) and KEN1{Niki USCG S); ELEVATIONS ARE +/- 5'
SECTION LINES ARE DRAWN USING PROTRACTED COORDINAT
6
r F. Robert
1-
l]~~
~ ff]g)g)rnœo
LOCA TION OF
PELICAN HILL OIL & GAS INC. WELL LOCATION FOR ILlAMNA 2
SEC. 29, T 9 N, R 14 W, S.M., AK
""'
ENGINEERS AND LAND SURVEYORS
PREPARED FOR:
PELICAN HILL OIL AND GAS INC.
DRAWN BY: JZW
CHECKED BY: CBS
JOB NUMBER:
2003-510
1" = 2000'
SCALE:
801 WEST FIREWEED LANE SUITE 201
ANCHORAGE. ALASKA 99503-1801
\. PHONE (907)-274-5257
.)
1/
/
~o
t::::i
ADl398131
ADl 399133~1
T9N
TeN
o 2000 4000
¡
I na Prospect
Formline Time Structure
on Tyonek Fm
Pelican Hill & Gas Company
2003
D
/.:V: Time contours (see)
Faults
Pelican Hill O&G leases
(
Pelican Hill Oil &Gas Company
Proposed Well locations
for liiam na #1 & #2
October 2, 2003
\...
e
e
PELICAN HILL OIL AND GAS, INC.
DRILLING PROCEDURE
ILIAMNA NO.1 & NO.2
By
Jim Mosley, Well Digger Inc.
Drilling Consultant
for
Arlen Ehm - Geological Consultant
Pelican Hill Oil and Gas, Inc.
and
Truman Hicks -Drilling Supervisor
Pelican Hill Oil and Gas, Inc.
ILIAMNA DRILLING PROCEDURE REV
Pelican Hill Oil and Gas, Inc.
Page 1
10/1 0/03
e
e
TABLE OF CONTENTS
AOGCC WAIVERS REQUESTED IN TIllS PERMIT TO DRILL........................................................... 3
RIG PREPARATIONS AND PREDRILL ACTIVITIES........................................................................... 4
"PRE SPUD AND INITIAL RIG UP OPERATIONS..................................................................................5
SPUD IN, DRILL 14-314" HOLE TO 80 FEET, RUN AND CEMENT 13-3/8" ........................................ 6
DRILL 12-114" HOLE TO 550 FEET, RUN AND CEMENT 9-5/8" CASING.......................................... 7
NIPPLE UP AND TEST BOPE AND .ACCUMULATOR........................................................................ 8
BOPE SCHEMATIC FOR BOPE TEST REPORT ................................................................................. 10
DRILL 7-7/8" HOLE TO 1D AND SET 5-1/2" CASING WITH CASING DRILLING TOOLS ............. 13
NIPPLE UP TUBING SPOOL, RUN LOGS AND TUBING WITH PRODUCTION PACKER.............. 14
ATTAClIMENTS TO DRilLING PROCEDURE........... ......... ................ ............ .................... ...... ........ 15
MUD PROGRAM........ ................ .................. ... ...... .... ................. ......... ........ ... ........ ................ .............. 16
PROPOSED FRACTURE GRADIENT AND MUD WEIGHT CHART .................................................29
CASING PROGRAM, CASING SAFETY FACTORS AND BOPE RATINGS ...................................... 30
BJ SERVICES CEMENT PROGRAM ................................................................................................... 31
LOCATION LAYOUT FOOTPRINT DRAWING ................................................................................. 43
RIG LAYOUT WITH DIVERTER LINE IN PLACE .............................................................................44
DIVERTER ST ACKUP DRAWING ........ ..................... ......................... ....... ........................ ................. 45
DIVERTER CLEARANCE DRAWING SHOWING KNIFE VALVE LOCATION................................ 46
BOP EQUIPMENT STACKUP WITH SURFACE WELLHEAD AND SPACER SPooL...................... 47
BOP STACKUP WITH PRODUCTION CASING WELLHEAD AND TUBING SPOOL ...................... 50
CHOKE MANIFOLD ............................................................................................................................ 51
ACCUMULATOR VOLUME REQUIREMENTS AND BELL NIPPLE DESIGN ................................. 55
BELL NIPPLE DRAWING FOR USE ON ALL THREE NIPPLE UPS.................................................. 52
SWAB KICK TOLERANCE CHART ..................................... ............. ....... ..... ........ .............................. 53
PRESSURE KICK TOLERANCE CHART ............................................................................................ 55
PROPOSED WELLBORE SCHEMATIC .............................................................................................. 57
PROPOSED DAYS VERSUS DEPTH CURVE ..................................................................................... 58
PROPOSED COMPLETION SCHEMATIC...... ........... ......... ........... ... .... .... ................... ... .......... ...... ..... 60
PROPOSED XMAS TREE AND WELLHEAD EQUIPMENT SPECIFICS ........................................... 61
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 2
10/10/03
e
e
AOGCC WAIVERS REQUESTED IN THIS PERMIT TO DRILL
1. Use of a diverter line sizing of 12" which is W' smaller that the size of the surface hole bit.
2. Use of threaded outlets on choke and kill lines. The maximum anticipated sUIface pressure is
expected to be less than 2000 psi and a waiver rrom the rigid lines requirements is requested.
3. Use of existing BOP control line hoses is requested. These hoses are not armored like coflexip.
The accumulator control lines will be run in a tray and wrapped with fire protection insulation
across the intervals in the substructure where the lines are not run in protective trays.
4. Use of crossovers on the 3-1/2" TIW and mop is requested in lieu of full opening valves. The
Planned Casing Drilling Operation is not conducive to utilizing a 5-1/2" TIW or mop. Therefore,
approval of the use of3-1/2" drill pipe size equipment is requested.
5. Drilling of the surface hole to a depth of 5 50 feet without the use of a trip tank is requested for the
following reasons. The interval will be drilled with a top drive and the space limitations on
location are such that the diverter line occupies the space required for the existing trip tank and
choke manifold. The trip tank will be set once the diverter operation is finished and the diverter
line nipp1ed down.
6. A waiver rrom the requirement of using manned mud logging operations and of collecting,
washing and retaining a set of well samples is requested. The well density in the general area is
such that no significant additional knowledge will be gained by having personnel on location to
catch samples and to mud log. Remote mud logging will be conducted via electronic monitoring
and this log will be provided to the AOGCC.
7. A waiver rrom the requirement for wellbore surveys while drilling is requested. Casing drilling
operations do not trip the pipe or BHA while drilling and have produced straighter holes than
those with normal drilling assemblies. Directional surveys are normally taken with either wireline
or MWD. Casing drilling operation are planned and these operations have produced straighter
holes than those with standard drilling assemblies. This well is planned as a relatively shallow
straight hole and will be directionally surveyed after completion.
8. A waiver to stop the leak off test of the surface shoe at 14.0 ppg EQ is requested. The well plan
anticipates using 10.0 ppg mud for the interval from the surface casing shoe to total depth. The
anticipated rracture gradient at 550 feet is about 14.0 ppg EQ. The operator does not see any
benefit to breaking down the shoe during leak off testing.
9. A waiver rrom the requirement to maintain H2S protective equipment on site is requested. This
well is planned as a shallow sweet gas test of previously identified reservoirs that have not
encountered H2S in nearby wells. Drill stem testing is not planned and, consequently, there will
not be any H2S encountered. The operator will maintain gas detection equipment in strategic
areas so that any gas or H2S will be detected and the appropriate response can be made safely.
10. A waiver of the distance requirements for the spacing of equipment rrom well bore is requested.
This compact rig and its support equipment make a very small footprint, which requires that a lot
of support equipment be placed within short distances rrom the well bore. All ignition sources,
except the drawworks engine, are within their own buildings or are at, a minimum, separated by
other building housed rig components. For example, the accumulator is about 20 feet rrom the
wellbore, but separated from it by a water tank: and the accumulator house. NOTE: That this
request does not include the diverter line, which will be as per the regulations.
11. The elimination of open hole logs is requested. Well density in the area make the surface hole log
unnecessary. Given the Casing Drilling operations do not normally provide for tripping, open
hole electric line logs are not obtained. In lieu of open hole logs, Pelican is planning on running a
cased hole log to identify gas bearing intervals. A waiver rrom the logging requirements is
requested.
ILIAMNA DRILLING PROCEDURE REV IOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 3
10/10/03
e
e
RIG PREPARATIONS AND PREDRILL ACTIVITIES
1. Finish building rig pits, installing electrical lines, piping, and instrumentation equipment.
2. Install and fit test top drive casing drilling system. Dismantle it and prepare top drive equipment
for shipping.
3. Install accumulator in trailer with air compressor and storage units.
4. Preinstall pit monitoring and gas detection equipment.
5. Prefabricate and procure wellheads, bell nipple, BOPE stack, hydril, accumulator lines, spacer
spools, diverter lines, and drilling spool.
6. Procure water tank and cuttings holding tanks. Ensure that water tank has steam lines installed.
7. Obtain and prepare to ship sufficient matting boards and matting to double layer under rig and to
cover the location and roads as per the land use agreement and DEC approval.
8. Contract for trucking to haul and deploy rig ftom yard to North Star Terminal. Rig is 21 loads plus
top drive and composite matting boards.
9. Contract for a barge company to move rig and associated equipment to Trading Bay Production
Facility barge landing..
10. Contract for surveyors to survey and stake location and provide plat for the location.
11. Share the costs of drilling a water well with UNOCAL at the TBPF.
12. Contract for a vacuum truck at site. A super sucker vacuum is preferred so that cuttings
movement can be handled with the vacuum, truck if necessary.
13. Arrange for Bulk Cement to be delivered to the site. Arrange for additional barge shipments as
needed. Cementing equipment should include at a minimum: two bulk silos for storage of cement
at the TBF; one bulk truck for use to move per job cement volumes to the well site; one bulk
hopper for the well site; and a cement mixing plant and pump for mixing and displacing cement
into the casings and wellbore. The cement jobs are expected to be pumped as two stage jobs with
one stage of bulk in a bulk tank and the other in the bulk truck. Sufficient heated water on
location will be required to mix each cement job. See cement plan for details on bulk volumes,
mix water requirements, chemical additives, etc.
14. Prepare Tubular Products and Casings for Shipment to West Side.
15. Move sufficient fuel and fuel storage tank: to West Side. Rig Tank: is 10,000 gals. Ensure that at
least 20,000 gals are on hand.
16. Move steam generator to the Trading Bay facility and have same prepared in a standby mode for
moving to rig site and temporary use during cold weather and prior to cement jobs.
17. Function test accumulator and BOP's prior to moving to West side. Ensure that accumulator has
environmentally ftiendly hydraulic fluid.
18. Check all radiators and ensure that all radiators have been flushed and filled with environmentally
ftiendly antifteeze suitable for minus 30 degrees.
19. Verify that all drilling assemblies and crossovers have been inspected and will screw together.
20. Ensure that a back up set of tools are available for each drilling assembly.
21. Ensure that a TIW valve and an mop are available for the 3-1/2" Drill pipe and for the 5-1/2"
Casing. A crossover on each ftom drill pipe to casing thread is acceptable provided that the valves
will test.
22. Prepare diverter lines with RF 150 flanges in advance and have at least two 25 foot pieces and one
5 foot piece with flanges preinstalled. Note: one 25 foot piece can have flanges on one end only.
23. Ensure that 2 foot sub and ramp are ready to be transported to West Side.
24. Ensure that sufficient mud products are delivered to the West Side.
25. Ensure that bell nipple has been fabricated to match the attached drawings.
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 4
10/10/03
e
e
PRESPUD AND INITIAL RIG UP OPERATIONS
1. Install interlocking rig mats on location and roadway. See location drawing and roadway route
drawings for details on areas to be covered with interlocking mats.
2. Install impermeable barrier of pit liner material over roadway and location. This will be placed
over the matting.
3. Place 6" Board mats where substructure is to be placed.
4. Dig and install 7-foot diameter cellar and place mats as needed to allow access to the cellar.
5. Set 2-foot substructure base and back rig in. Set remaining substructure.
6. Set mud tanks and begin hooking up lines and instrumentation.
7. Set mud pumps, and generators and hook up all lines and valves.
8. Set water tank and place doghouse on top. Plumb water tank
9. Place accumulator building. Fill pits and solids control equipment with water. Leak check all
fittings, hoses valves, etc. Set trip tank as per location rig up drawing. NOTE: After rigging down
the diverter lines the trip tank will be turned around so that the choke manifold and gas buster can
be rigged up.
10. Set gas buster and hook it up to the rig pits. Note: the gas buster will not be used during the first
500 feet of drilling.
11. Layout diverter lines ready to bolt together and anchor line.
12. Put 13-5/8" wellhead, diverter spool and hydril into end compartment of substructure.
13. Set catwalk and V-door slide.
14. Set remaining ancillary equipment, doghouse mud logging shack, tool sheds, etc.
15. Install containment berm around all rig components.
16. Begin filling water tanks, mud pits, and fuel tanks.
17. Prepare to raise mast
18. Fire up generators, heaters, steam generator, and air compressors.
19. Fire up rig engines and mud pumps.
20. Layout guy wires and check all of the mast for verification that it is ready to raise.
21. Raise mast ITom horizontal to vertical.
22. Telescope up the upper portion of the mast and pin it. Secure guy wires and anchors.
23. Set Tesco top drive power unit and hydraulic lines.
24. Begin mixing spud mud.
25. Install the cellar jet pump and plumb it to put returns across shaker.
26. Set top drive rails on catwalk and begin installing it in mast.
27. Set top drive unit on catwalk and pick it up with blocks. Install TBAR stiffener to top drive and
hook up Kelly hose and hydraulic hoses.
28. Set 6" drill collars and BRA on catwalk. Pick up 14-3/4" drilling assembly and prepare to drill to
80 feet.
29. Set pipe racks and cuttings tank. Place two joints of 13-3/8" casing on pipe racks.
30. Place sufficient drill pipe on pipe racks to drill to 550 feet. Place 12-1/4" tools on end of catwalk
ready to move to the rig floor after drilling the 14-3/4" hole.
31. Rig up BJ cementing unit and place bulk hopper and lines such that the two cement jobs can be
done ITom one rig up. The 13-3/8" cement job is a very small job and can be considered a warm
up to the 9-5/8" job.
32. Lay cementing lines to the catwalk and place cement standpipe against substructure. Chain
standpipe in place and lay chicksan lines to BJ unit.
33. Rig up gas detectors and verify that PVT system is working. Verify that remote mud logging unit
is functional.
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 5
10/10/03
e
e
34. Install Koomey hoses in fire protection tray and lay same to edge of substructure. Inspect rig
location for completeness of rig up and for adequate environmental protection and spill
containment. Place impermeable barrier and berms as needed to contain location runoff Berm a
diverter pit with barrier under the end of the diverter line. See attached location layout drawing
for placement of equipment and for any revisions needed.
35. Notify AOGeC of intent to spud.
SPUD IN, DRILL 14-3/4" HOLE TO 80 FEET, RUN AND CEMENT 13-3/8"
r
11.
Ensure that bit and drilling assembly are in the center of the cellar. Wash the first few feet and
then drill 14-314" hole to 80 feet taking returns to the cellar and pumping mud and cuttings trom
cellar to shaker via the cellar pump. Use one pump and low flow rates to avoid washing out trom
under the rig. See hydraulics program, bit program and mud program for details.
Circulate hole clean and pull out of hole keeping hole full.
Lay down 14-314" bit and stand back 6" drill collars if possible, otherwise lay down drill collars.
Pick up two joints of 13-3/8", 54.5#, K-55, BTC casing and run in hole with same using air hoist
to run the casing. Set casing on bottom and if necessary wash to bottom.
Rig up BJ fast lock head and prepare to cement 13-3/8" casing. Mix and pump cement job as per
the BJ cementing program. Hold pressure on the cement for a minimum of 6 hours. Release
pressure and slack off the casing. Remove fastlock cement head and prepare to cut casing. Rough
cut 13-3/8" casing and lay down stub.
Final cut 13-3/8" casing as per diverter drawing and space out requirements.
Install slip lock 13-5/8" 5M wellhead and diverter tee as per diverter drawing. Install knife valve
and hook up diverter lines to ensure that the diverter lines run downhill.
Install control lines to diverter and knife valve. Install bell nipple and fill hole with water up to
the diverter tee onlv. Install flowline and flosho.
"
Pick up drill collars and run same in hole. Function test diverter bag and knife valve with drill
collars in hole. This will prevent unnecessary damage to the hydril element. Ensure that
accumulator closing pressure for the diverter bag is at regulated to be at least 1000 psi but not
more than 1500 psi.
Open diverter and knife valve. Ensure that diverter lines are not holding fluid and cannot fteeze
up.
Pick up 12-1/4" drilling assembly as 8-1/2" Bit and 12-1/4" RWD or underreamer as per bit
program.
c.o~c* ~G~ Ç-0'- ~.,\-~<;<s
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 6
10/10/03
e
e
DRILL 12-1/4" HOLE TO 550 FEET, RUN AND CEMENT 9-5/8" CASING
r
-"-'''''e,.
1.
Run in hole to top of cement with 6" drill collars. Pretreat mud for cement contamination. Wash
and drill to bottom.
Function test mop and TIW valves. Ensure that both are on the rig floor and that an operating
handle is at hand.
Check all PVT flowsho equipment to ensure it is in working order. Verify that gas detectors are
all functioning correctly.
Lay sufficient drill collars on catwalk as needed to provide at least 15000 pounds of weight to the
bit. Dri1112-l/4" Hole to 550 feet as per bit, mud, and hydraulics programs.
Catch cuttings in cuttings tank and de-water same with trash pump as needed.
Drill to 550' reaming each connection. NOTE: Drill hole to fit casing strap based on depth of
underreamer.
Circulate bottoms up and pull out of hole. If hole pulls slick, then rig up to run 9-5/8" casing. If
hole had tight pulls, then make wiper trip, circulate out again, and pull out of hole prior to
attempting to run casing. Ensure that high viscosity mud is left in hole prior to pulling out of hole
for casing. Monitor hole fill-up and maintain hole full while tripping pipe.
Lay Down RWD or Underreamer and stand back remaining BHA and drill pipe. NOTE:
Standing back is not an option. The drilling assembly will be laid down prior to rigging up to run
casing. Rig up to run casing. with top drive.
Run and cement 9-5/8",32.3#, K-55 buttress casing as per mud, and cement programs. Ensure
that float shoe has receptacle for non-rotating composite cementing plug. Use ofPDC drillable
cement plug with non-rotating feature is preferred. Five centralizers, one each on the first five
joints are recommended. Run casing to bottom, washing as necessary to place casing shoe on
bottom. Pick up casing one foot above bottom and hold in place during cement job.
Bump plug, hold pressure on 9-5/8" casing for 30 minutes and record same on chart recorder as
casing pressure test. Release pressure. Confirm float is holding. Place any excess cement in
cuttings tanks and retard same.
Hold casing in place for a minimum of eight hours. The 9-5/8" wellhead will be welded on after
cutting off the 13-5/8" head. SEE BOPE drawings of stack up for correct heights to cut off
casmgs.
Cot--~l'.\: ~OGCC ~ rßO\' \cec. \
Wi tç"'-Q s. s ..
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
HOLE SECTION NOTES
NOTE: If well control situation arises on surface hole, driller will operate diverter valve, close
Hydril and shut down mud pumps and engines. Crew will muster at pre-designated area.
If lost circulation occurs, establish loss rate at full drilling circulation rate. Contact drilling
engineer and mud company representative to discuss options.
a) Begin drilling with water base-mud starting at 9.5 ppg and allow the mud weight to rise to 10.0
ppg. Maintain mud weight by controlling solids with mud cleaner operation. The cuttings
will be stored on site in a steel tank. Use vacuum truck and/or 966 loader to move cuttings as
needed.
b) NOTE: Utilize all fluid and waste transfer tracking documents as per MI Drilling Fluids
ILIAMNA DRILLING PROCEDURE REV IOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 7
10/10/03
e
e
Recommended Mud Properties for Surface Hole:
Density: 9.5-10.5 ppg
Viscosity 44-100 sec/qt
PV 12-16 cps
yP 15-40 lb/lOOft2
Gels 15-30
Fluid Loss NC to 6-14 cc API
PH 9.0-9.5
Contingency usage of lost circulation material on site includes:
Seepage losses- Add 5-10 ppb graded calcium Carbonate
Moderate Losses- Mix 10-30 ppb of Seal Fine & Medium while drilling and/or spot pills
across loss zones.
c) No known shallow gas zones exist; however, swabbing potential exists on all trips. Because of
the considerable length of production of the nearby Trading Bay field, there is always a
possibility of some shallow gas accumulations occurring. Continuously fill the hole on all
trips while the diverter is in use. Discuss tripping procedures with all personnel. Do not
POOH at high speeds. Use trip tank: sheets and continuously fill hole on all trips. Check for
swabbing on each stand out of hole. If swabbing appears to be an issue, then use top drive to
pump out of hole.
d) Gas/H2S detection and monitoring drilling parameters will begin rrom the surface.
e) Rig crews will participate in a pit drill or trip drill each tour.
t) Accurately monitor trip tank and fill out trip sheets.
g) Visually monitor hole at all times on trips. DO NOT USE STRIPPING RUBBER BELOW
THE ROTARY TABLE.
NIPPLE UP AND TEST BOPE AND ACCUMULATOR
1. The removal of the 9-5/8" casing and nipple down of the diverter will be done similar to the
original stack up except that it will be necessary to cut the 9-5/8" several times to enable removal
of the diverter pieces. Slack off on 9-5/8" casing and confirm that it will stay put. Nipple down
the bell nipple and pick it up. Cut 9-5/8" right on top ofhydril.
2. Lay down cut piece and bell nipple. Nipple down rrom 13-5/8" wellhead and rough cut 9-5/8".
Lay down cut piece and set back down with diverter. Nipple down and pick up Hydril. Set Hydril
in sub. Nipple down diverter tee with 16" spacer spool and knife valve. Cut off 13-5/8" wellhead
and send it to ABB Vetco for stub removal and redressing for next well.
3. Final Cut 13-3/8" casing as per BOP stack up drawing requirements for space out. Final cut and
prepare the 9-5/8" casing top for welding on surface casing wellhead. See drawing for details.
4. Weld on II" 3M by 9-5/8" SOW wellhead and test void to 500 psi. Head should be preheated
prior to welding onto 9-5/8" casing.
5. Ensure wellhead tests prior to nippling up spacer spool and BOPE.
6. Nipple up spacer spool, drilling spool, rams with 5-1/2" pipe rams installed in upper cavity and
blinds in lower cavity, Hydril and bell nipple.
7. Install flowline and sensors. Hook up accumulator lines, choke and kill valves and lines.
8. Hook up gas buster and choke manifold.
9. Prepare to test preventers and accumulator.
10. Run and set test plug in 11" 3M wellhead.
11. Fill stack with water and verify system holds water.
12. Run test joint with TIW valve on top. Screw in with top drive and prepare to test.
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 8
10/10/03
e
e
13. Rig up test pump and chart recorder to record BOPE tests. Fill out BOPE test report and fax same
with daily drill report.
14. Record and test BOPE as per the attached BOPE test sheet. Tests 1 through 4 test pipe rams,
entire choke manifold, kill line, kill line valves, top drive, Kelly hose, and standpipe. Test 5 and 6
test blind rams and choke line valves. Test 7 tests Hydril.
15. Recharge accumulator and turn off power to all the accumulator pumps. Turn off air supply to air
pump. Prepare to test accumulator.
16. Close and open Hydril, record pressure and closing time. Close and open blind rams. Record
pressure and closing time. Close and open pipe rams. Record pressure and closing time. Close
and open HCR valve. Record pressure and closing time. Record final accumulator pressure and
verify that at least 1200 psi remains in the system. If the pressure is below 1200 psi, then each of
the nitrogen bottles must be checked for correct precharge.
17 . VerifY that accumulator lines and control hoses are :£Tee of leaks, properly placed in the fire
protection trays, and that the control hoses in the cellar area are adequately wrapped with fire
protection insulation.
18. Line up choke manifold and kill line valves as follows. TIW and mop on rig floor, insidekillline
valve closed, outside kill line valve open, inside choke line valve open, HCR closed, and choke
manifold lined up to gas buster through the hydraulic choke with valves 1, 5, 7, and 8 open. All of
the remaining choke manifold valves are to be closed.
19. Line up standpipe and Kelly valves as needed to begin next hole section.
20. Pull test plug and verify that mud is conditioned for cement contamination.
21. Pick up 7-7/8" drilling tools and crossover to 5-1/2" casing drilling string.
ILIAMNA DRILLING PROCEDURE REV 100CT.docoPelican Hill Oil and Gas, Inc. Page 9
10/10/03
DOPE SCHEMATIC FOR DOPE TEST REPORT
n
A
......
A
~
A
A
v
w
nJAMNA DRILLING PROCEDURE REV lOOCT.doc
n.....1.:................ TT':ll 1\':1 .-............3 r'......... T-..-.__
n......"'""..... 1{)
11\/1 A/A""
r1
10/10/03
lOOCT.doc
Page 11
ILIAlvINA DRILLING PROCEDURE REV
Pelican Hill Oil and Gas, Inc.
e
e
DOPE TEST SEQUENCE SHOWING VALVE POSITIONS & REQUIRED TEST PRESSURES
TEST #
from
Fill UP
fÌ'om Test
Joint with
Top Drive
#1 ITom
Test Joint
with Top
Drive
#2 ITom
Test Joint
with Top
Drive
#3 from
Test Joint
and NO
Top Drive
#4 from
Test Joint
#5 from
Stand Pipe
through
Kill Line
#6 from
Stand Pipe
through
Kill Line
Valves Valves
Open Closed
All
None
1,2,3,
11, and
Stand
pIpe
4,8, 9,
10, and
Top
Drive
IBOP
4,5,6,
10, and
TIW
TEST
PLUG AND
OR TEST
JOINT
Test Plug
and Test
Joint with
Top Drive
Test Plug
and Test
Joint with
Top Drive
Test Plug
and Test
Joint with
Top Drive
T est Plug
and Test
Joint
Test Plug
and Test
Joint
Test Plug
T est Plug
Test Plug
and Test
Joint
Preventer Low High Objective of Test
Closed Test Test
Psi Psi
Annular Leak Leak: Function and Fill System
Check Check with Water. Pump through
Gas Buster, and Kill Lines
Pipe Rams 250
pSI
Pipe Rams 250
pSI
Pipe Rams 250
pSI
Pipe Rams 250
pSI
Blind
Rams
250
pSI
4,5,6,7
,8,9,10
, 12,
13,
and
TIW
1,2,3,5
,6,7,11
,12,
13,
TIW
and
Stand
Pipe
J.,2,3,8
,9,11,
12,
and 13
1,2,3,4 7, and
,5,6,8, TIW
9,
1,2,3,4 13
,5,6,7,
8,9,
10, 11,
and 12
1,2,3,4 12
,5,6,7,
8,9,10,
11,
and 13
# 7 From 1,2,3,4 12
Test Joint ,5,6,7,
8,9,
11,
and 13
NOTE:A 5-1/2" TEST JOINT WILL BE REQUIRED TO PERFORM THE ABOVE TESTS. USE OF A
SHORT CROSSOVER TO THE TEST PLUG THREAD IS POSSIBLE PROVIDED THE
LENGTH DOES NOT PUT THE CROSSOVER IN THE PIPE RAM.
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 12
Blind
Rams
250
pSI
Hydril
250
pSI
3000
pSI
3000
pSI
3000
pSI
3000
pSI
3000
pSI
3000
pSI
1500
pSI
Shell Test of System, Outer
valves, Stand Pipe, Kelly
Hose, and Pipe Rams using
Test Joint and standpipe
Test inner Kill line Valve,
Manifold Cross Isolation
Valve, both manual and
hydraulic Chokes, and
standpipe
Test Kill line inside Valve,
Choke Manifold inside
valves, Test Joint, and TIW
Choke Manifold Isolation
Valve
Kill Line, Standpipe
Valve, and HCR Valve
Inside Choke Line Valve,
Standpipe Valve and Kill
Line
Hydril, Shell Test of Stack,
and Inside Choke Line
Valve
10/10/03
e
e
DRILL 7-7/8" HOLE TO TD AND SET 5-1/2" CASING WITH CASING DRILLING TOOLS
1. Run in hole with 7-7/8" drilling tools picking up 5-1/2" 15.5#, K-55, buttress casing with torque
rings installed in each joint. ------.
2. Cãfefully tag up on top of cement expected at 510 feet.
3. Begin drilling cement and plug with 7-7/8" PDC drilling assembly as per bit, mud, and hydraulics
programs.
4. Drill from 550 feet to 575 feet and circulate out cuttings and cement contaminated mud.
Condition hole for leak: off test.
5. Pull any casing collar out ofBOPE stack, close rams, and test casing shoe to an equivalent of 14.0
ppg or leak:off, whichever is lower. It is anticipated that the shoe will hold the 14.0 ppg EQ as a
casing shoe integrity test. If shoe leaks off, contact drilling engineer for further recommendations.
Ifleakoffis less than 13.0 ppg EQ, then a squeeze job will most likely be necessary. Contact mud
company and cement company for further advice.
6. Ifleakofftest results are satisfactory, then drill ahead as per bit, mud, and hydraulics programs.
Drill to 5500 feet while maintaining mud weight as per the program and monitoring gas via the
unmanned equipment. Fax reports and mud log to Anchorage daily.
7. Report all gas shows to Arlen Ehm immediately. A gas show is any show that has double the
background gas units. NOTE: Kick tolerance decreases dramatically as the well is drilled deeper.
Maintain mud weight as per plan and if indicated increase mud weight as needed to keep
background gas below 100 units. Expect numerous coal beds with gassy mud log results.
Maintain weight on bit and rotary as per bit recommendation from Tesco.
8. Upon reaching total depth, circulate out for two bottoms ups and until well appears quiet. Rig up
to cement 5-112 Casing as per cement program. Ensure that sufficient heated water is available for
the cement job, that the cement and field water samples have been lab tested and that the casing
cementing tools are ready for the job. Casing slips should be dressed to be dropped from the rig
floor after the cement job. Have tubing spool ready to be installed once the 5-1/2" is set.
9. Rig up BJ and cement 5-1í2" casing as per cement plan. Bump plug and hold pressure on plug for
5 minutes. Release pressure and rig down BJ. Drain stack and drop slips on 5-112" casing.
Ensure that 5-1/2" is landed with weight set slips. Set the entire weight ofthe 5-1/2" on the casing
slips.
10. Cut 5-1/2" casing just above the bell nipple and lay down cut piece. Pick up bell nipple and recut
5-1/2" just above the Hydril. Remove cut piece, remove bell nipple and pick up BOPE rams and
spacer spool. Rough cut 5-112" casing and lay down cut piece. Nipple down Hydril, rams, drilling
spool and spacer spool. Install packoff on 5-1/2" casing slips.
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 13
10/10/03
e
e
NIPPLE UP TUBING SPOOL, RUN LOGS AND TUBING WIm PRODUCTION PACKER
1. Install tubing head and drilling spool. Nipple up drilling rams and Hydril. Nipple up bell nipple.
2. Run test plug and change rams to 2-7/8". Test all BOPE rams, Hydril and all breaks in the system
to AOGCC specs and as per BOPE test procedure attached herein. A 2-7/8" test joint and a 7-
1/16" test plug are required. Crossovers ftom the 3-1/2" IF TIW and mop are required to
crossover to the tubing thread for both the TIW and the mop.
3. Rig up wireline and run pulsed neutron log ftom PBTD (TOC) to 500 feet above uppermost show.
Top oflogged interval is expected to be 2500 feet. Continue running Gamma Ray and CCL log to
the surface.
4. Prepare to run 2-7/8" tubing and packer.
5. The completion procedure interval details will be determined after logging and will be based on
results ftom the pulsed neutron log.
6. For the purpose of this permit, the completion procedure will be generic and should only formalize
the prospective intervals and perforation depths after logging.
7. Pick up TCP assembly loaded with 6 SPF DP charges to perforate as indicated by logging results
and Rill on 2-7/8" tubing with packer and "X" nipple as per completion program
recommendation.
8. Tubing assembly should include TCP Guns with bar drop firing head, auto drop sub, perforated
sub, "X" nipple below packer, two joints of tubing, packer with millout extension, one joint of
tubing, "X" nipple, and tubing to the surface. A chemical injection sub should be run at a depth of
1000 feet with a 3/8" control line to the surface so that methanol can be pumped into the well for
fteeze protection during winter time production operations. The tubing should employ protectors
for the chemical injection line.
9. Run in hole to bottom or near bottom and circulate mud out of hole with 10# brine. Add biocide
and antioxidant type corrosion inhibitor to the annulus by reversing annulus after the well is
displaced with brine.
10. Pull back up hole to correct measured depth taking care not to mash the chemical injection line.
11. Place tubing with packer at 5000 feet and tubing hanger in full tension. If TCP guns are used, then
the BRA will need to incorporate a gun release sub.
12. Run correlation log as needed to place the guns on depth. Space out, make up tubing hanger and
land it in tubing spool. Pressure test chemical injection line and pump through same with
methanol prior to landing hanger. Lay down landing joint.
13. Nipple down BOPE stack, nipple up Xmas tree and test same.
14. Rig up to reverse circulate fteeze protection fluid into annulus. Pump 25 bbls of methanol or
diesel into annulus and shut down.
15. Rig up wireline and run and set tubing stop and PX plug below packer. Pressure up and set
packer. Retrieve plug and tubing stop.
16. Nipple up production test separator and prepare to drop bar perforate.
17. Perforate and test as instructed. Secure well, and move rig to next location.
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 14
10/10/03
e
e
ATTACHMENTS TO DmLLINGPROCEDURE
1. Survey Plat of Location
2. Topo Map of area
3. Aerial Photo of Locations with Pipeline Route and Stakes shown
4. Mud Program - MI Drilling
5. Proposed Fracture Gradient and Mud Weight Chart with Offset Mud Weights Plotted
6. Cement Program - BJ Services
7. Proposed Wellbore Schematic and Hole Volume Calculations
8. Location footprint drawing - VISIO by Quadco
9. Diverter Stackup Drawing
10. Diverter Cleamace Drawing showing Knife Valve Placement
11. BOP Stackup with Surface Wellhead and Spacer Spool
12. BOP Stackup with Production Casing Wellhead and Tubing Spool
13. Bell Nipple Drawing for use on all three Nipp1eups
14. Swab Kick Tolerance Chart
15. Pressure Kick Tolerance Chart
16. Koomey Unit and BOP Equipment Hydraulic Fluid Requirements
17. Proposed Bit Program
18. Proposed Drilling Days versus Depth Curve
19. Proposed Completion Schematic
20. Proposed Xmas Tree and Wellhead Equipment Specifics
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 15
10/10/03
.·t
R
~R--~
3601 C Street, Suite 1378
Anchorage, AK 99503
(907) 272-1232
(907)272-1344 Fax
info@petroak.com
.
2.63-/72-
.2C0-/73
.
Mr. Steve Davies
Alaska Oil and Gas Conservation Commission
333 W. 7\t1 Avenue, Suite 100
Anchorage, Alaska 99501
Fax (907) 276-7542
RE: Pelican Hill Oil and Gas, Inc. lIiamna prospect seismic data
Dear Mr. Davies:
I have interpreted the seismic data in the lIiamna prospect area on behalf of Pelican
Hill Oil and Gas, Inc. In the course of my interpretation, I saw no indication of any
shallow gas accumulation in the area on the seismic data. Specifically, I observed no
amplitude anomalies, phase reversals, or gas chimneys on any of the seismic lines at
a depth of less than 2000 feet. The lIiamna #1 well is located approximately 750 feet
from the nearest seismic line and the lliamna #2 well is within 100 feet of a seismic
line.
Unfortunately, I cannot provide you with a copy of any of these seismic lines because
the data are proprietary and Pelican Hill Oil and Gas, Inc. do not have any rights to
show the data. Please let me know if I can be of further help to you.
,cerelY, DAb ~
J c e "--'~
Paul Daggett
Staff Geophysicist
&
e
e
MUD PROGRAM
July 21,2003
Pelican HiH Oil & Gas
Anchorage, Alaska
ATTN: Arlen EhmJ Allen Gross
Ref: lliamna 1, 2, & 3.
Gentlemen.
Enclosed is the mud program tor your upcoming Iliamna casing drìlling program. Included is a
wen summary, economic summary. interval summary. and the project team. At the end of the
project all unused material can be returned for tùll credit if it is in sellable condition.
This program is for a low solids gellgclcx fluid in the surface interval and in thc production inter-
val. Mud weights up to 9.6 are expected. We recommend that a well control contingency stock of
1000 sacks of barite be maintained on the West Side of Cook Inlet at a readily accessible: loeation.
All material shipped to the \vest side can be returned t()f full credit as long as the lnatcrial is not
damaged.
We also recommend that careful planning is utilized to minimize fluid volumes and maximize the
potential reuse of all drilling fluids.
Please caU me if you have any questions regarding the mud program.
Lee Dewees
pf(~jeet Engineer
M-I Drilling Fluids
907274-5533
M-I. Drillíng 'uids L.L.c.
72\ West First Avenue
Anchorage, Alaska 99501
(907) 274-5564
(907) 279-6729 F¡L\
~........ i........·.·. ... DRW"';
r~.FlUIDS
e
Well Summary
c.t'íg He.
Sia Sb
(in) (Iìí)
ClÜilìg
p~
i 5,18'" 12 1l4"
C;f!IÍI};8
.5 lt2" 7 71'8''''''''
C:aS:i'\t
/'*ts II e 1
Jfell (Ton/rol
Gus Alck~c"
K
L
l\'tfUi e 2
Solids
K /,\'sue 3
Hole ,,-S'ftt1bili(V
{'()tll ..Yttlbili(V
Key IS,"llt? 4
f"'fuids (111l/ (~lIt-
til1gs J., lllulgel1lent
..
M-I I)rmin~Fluid~ I..L.e.
n 1 W0!1tF'irS'l A\lmœ
Á.nIò:;lrorage. Alaska ~ì'}~J E
(l~J7) 274-5564
(~)lJ1) 219-6729 F'ílX
e
Iliamna 1,2, & 3
~
(n)
TVO
Mud
S)IØiI:m
MUd SliM ~11Wì
~ 0.111 Mud GMt
M)
C~
600'
600' Ge:vGelex 3.&..95
4
$lt200
5500'
S$ß!)'Flo~~!IJ.3 % KCE 9..6
11
$24150
., 1\<flJl4utlÙn ool~tant ,attet'1tìOI1 fOl' shªliowt~lSk¡c;ks,
., J\'wntain adeqWfite b@rite ino¡¡.en!\.ory.
· It IS ImIX)ftant to mwntwn LOS at le.:s$ thar) 6i1o'~ to aCCOtn1f¡(}·
date cas,mg dnlhng operatlotl$
· i\dd SP 101 andP1(,Jypac tIt (L'} requtred
· Add AsP"..)1 $urnen»e (@ 2to 6 fW,)Utu:Is pet' barrel only ff
S&OObr.bÜlg ool:d becotnes a proble..}),
· Ophmize the use of aU solids OOil'rot equlpntent. UdU:ze
mud clea:net on $urface vQhune \Ilith tline sçreens·.
· \Vbenpo~íble r~"')'cle aUt1uad..
~... .................. ... ..................... Oil.·. LLIIG...· ..
. .....' .... . FLUIDS
_. .. " . . .....', ,,~. ." ,
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas. Inc. Page 17
10/10/03
e
Economics S,ummary
e
Iliamna 1,2, & 3
, ~f~~;!)t~ã-~r'·"~.·.:~~r-~ "~~íij¡'~~;':'":~ ·,:::'.,:·.··.,:~,~~~,t~~~··~i:....,'
..~: ~';·;""iI.~.Y!!l ·:·,;("...~$.·.CO'þ:' ... ' . ..' .,.,:(".,..:,,;,'"
'. ..., ....,i..'..· . (If· ,. '." ($f ".,'. '.. 'IS .....
. " ,. " :." ,., ,.,. ,., ': ..'.> .. .... . ,:::.~> " .. ,:;,:: ". ,:' ·.i.: ",::~,..,...'~,.:...:.(.., .:.'..:..:".'..':.."....,:::....,':'...'~...:,:,',....~,:,..
.:.' ::':' :~':' ':" :'" ~;'~<::::~':~;"~;:"..:~:':;:::~;~,'~'.:... i:':: '. :\~.,.:y. :"?::: ~ '
Surf~
600'
:$5600
$2600
$8200
4
4
Drillil18;
5550'
$12000
$4550
7
$24750
II
1IIIIIIIIP' __
· ('0$( lnch..œ$ 8 1/2" s;urface J>tlot 11(}le
· full fane engmeenng servu::e H, mcluded 10 ,''Os1
· ('osts do not inchbde ImY coo~deraÜon for to${ Cif·culadon Of' stuckptpe,
M-[ Drilling Fluids LL.C.
721 Wei1F'jI':štA'íi't.~
/Uk:;büragc, Alaw 9950 t
(907) 214-5564
(907) 21'9-6729 Fu
DRILLING
FLUIDS
ILIAMNA DRILLING PROCEDURE REV lOOCT,doc
Pelican Hill Oil and Gas, Inc. Page 18
10/10/03
e
In'terval Summary --
e
Iliamna 1,2, & 3
1600' 12 1/4" Open Hole
Orilting Ftuid System GeS-Gdex
I
I
Key Products MIGeII Gelext' Baritell\>ly Pac UllSodaAsh/Desœ CF¡
Salkls Control Shakerl DeSHterlCen:trifuge
Potential Problems Ú,)st CirculatiQn i I Drm Solid$l Hole StliliiHtyl
Sloughing CoallBitBaUillg
~ -"'
", ,.---. -....."
IntervalQriUll1gF,luidPropertles
Depth
iIttiltt'llM
tit)
5(1)'
Mud
Weight
(PPlt
8.895
15-25
Plas.tic
W",CMity
tèp)
20-25
Yie1d
PðiN
flhliOOfP)
25- .'5
API
Fluid loss
fmU3OmfA)
8- to
G&í
StNndth
tlbliOOW)
12iJ5
Total
Sòlift
f%)
.,..." ,
· Budd IJ1Hlal \;()Iume wHh fresh Wa1eï, !:; pJ1<b (')f Ml Get <1elex ~"n¢ bag (,t" (ie'lé'x f)è! tì'o'é'
sacks of MJ (jel'~ soda ash as tè(Iult'ed, and battle to 9.:5 F'f'g
· Open h4.)le to t2 /4"
·
('f J
· Keep dIm ~)hds to anunimuU1 by aggre~slve use of aU sohd'ì 'XJ\lllfQI equipment, dt!uhQn \,",,'tfft
fresh waterm~ be requit'ed.
· l)se Ðesto CPt() thin the mud ìfrequin~d.
· Spot LCM r~m .r lost C:trCiulatioft OCCiUf:s,
., Run ~Ca$íng and deatlpít:s. for newf1o~PfO !\J)'stern.
· 11~ítjal ~~%e requiretuetUs sht,}uld be 400 bbls:
M-I Drimi~ Fluids LL.C.
121 Wæít Fif'-'t ^IlefU
.Á.I1c11Cíl'age,AJa!lka >I)I)$() I
{91J7) 274-5564
{9fJ7) 279-6129 Fa:>;
DRlLLIfUG
FLUIDS
ILIAMNA DRILLING PROCEDURE REV IOOCT.doc
D.....lTO 10
10/10/07,
Dol~"'Or1In LT~11 (,,\';1 .........,.:¡ n."'C" Tn,...
e
Interval Summary -
e
Iliamna 1,2, & 3
5500' 7 7/8H Hole 5 1/2" Casing (drilUng with casing)
Drllln9 Fluid System (Jel<~lex
Key Products MI Gel I (1e1exl BIritelPOIyP¡¡ç VI/Soda .4$h/De:soo CF."SodhJtI1 Bi~
wbcmatelDO
Solids Control :)}.~....~r.:;(fli!,;;';f'~l!:.~~2~~;;:;
.-
Potential Problems LœtCirculatiofi / Drill SoUd.·,/ HQle ;StabUi.~'l S~OU&tî~
h'tg Coal/Bit Bamt1i
Interval· Drilling Fluid Properties
Depth
lätéN.at
tft)
IO{)D'
j,toolr
.............~.
þt;/l:!itiC
Visoosfty
tcþ)
12.;20
Mud
W'ìMght
(pp.n
'l5-W.Ü
HU)
12-20
. ---
Ykdd
~
'lbI"~
A~
FloW Lœs
tmUaOmifi)
Gèt
$tænglh
tlhf100ft#)
8/H
OriÜed
SoIkM
(%)
<5~~
~.
12-20
8-W
<6%
r
...,
12-20 () - 8
.. ............- .".
m/l$
· T n~!lt surface mud tcn cement coníammaW.m \.'tiiuhS().(jtûn, bll::~(bof1ate and D~c() CF Run $ØI~
!d,'ìconttxll e<tupment Rutl nmd cIeaner\V'íth 325 me-sh ~Cleen$ ~)tl $urface vohm1e pno! to
dnIHng pJoducuon mtef'Va1.
· Imtial mud we.!f;ht should be 8.8~9.0 Pl)¥· Unless bole C()11dUíO<fU:¡ d1i.'Ulte odler\\i1s:e.
· Keep drill sohds to tess than Mcf¡, by ~~t'eg~fVe ~<;:e of aU solids control equlptnent, and dth.rhon
if fel;lUllJ'ed
.. MaÎfìtronfluid IQ!,;s Ç¡{)fttf'o1....,1th additions ()fPoly PacUL
· Inítild\l(}lume fequín.~Inen;s should be 600 bbls
M-I Df'imn~ Hum L.L.C.
721 We!rtFi¡rm A\'L~1.IJi.'
Atw1kir., AI¡¡¡!dœ 9')5.0 1
(907) 274-5564
('Xm 21~6729 Fí1x
ILIAMNA DRILLING PROCEDURE REV lOOCTdoc
Pelican Hill Oil and Gas, Inc. Page 20
Fm....... / .. .......... aRß,..LING
. '.. ... PlUIDS
'!!."...._.._., ,_·c,_·· ..
10/10/03
e
L.CM Guidelines-
e
Iliamna 1 ,2, & 3
'·~..,C¡rçl.(tatl(Jn'
lost Circulation Recl,)mmeuded lCM pm Fonuuta,.;:¡
Problem.
Key Products DdlUn.gFluid l M..I SealFine~ Medium, CQan¡e I X~ Polytner
Form .A Se1lSafe Carb 10..20..40
.' ... . ·C· .~. . . .,... ... .. ·P'·· ·····1/8· .... .. h· ..... .'.., ......... .
.. Lóst>ltcUâtlöh': "",:Ilg .t'Ltìssêsr
. . . . . '. .
Voh.ìne
of Mud
CbBmliM)
30
MtJUt
Fine
ffJÞD)
15
M..¡ Seat
Medium
fppb)
o
,..-
M.f Seat
c.oan.
(ppb)
()
lost Circulation Pin (Moderate Losses)
VQlume
òt'Mud
(bam!Is)
40
MUth
Fine
(ppb)
,.. SéaJ
Medium
Cppb)
2(1
20
l
'W..I .Seãf¡
·Cöanè
....)
o
. Lost Circulation PIli (Severe losses)
VofUmé
of MUd
(bam!~)
50
_XI
fine
(Pþb)
20
I\W IBM
Medium
fppb)
20
. Spot ~he pm &::1'0$$ the I(J$:\> }'"one.
. 1.Jse MIX Pine when1\>I\\,'D andl()f tnudnh:,)tm' are being used.
!it tJse of Sa.tè Carb pt'ooucts: as requil'e'il
M-[ Dfmii1~ Fluids LL.C.
721 We!!t Fir~ A\'t!'ÌJ1:1I£
AiJ.:JbOl"3{ti!, AI¡¡¡!lb, 9'}50 !
{OO7) 274-5564
(9Ü7) 279..f;niJ Fa:"
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 21
M.f SUf
CoatM
Ippb)
10
.
..
I
}t..C I
Polymer
....)
1/4 _...I
}t.;(;
PoIymtf
I...)
1,"2·
-
x..c
PoI,....t
.....)
J
DRILLING
FlUIDS
10/10/03
~.
10î1'· .
~1ï.; ..
r4bd.
VfèiA~·
.~
_riaï ..
Ø94e
"ight .
""riBl
$G
~~ht..
~riaï
.þt~.
~.~.....
.-
$$8 s..lt
\4,.1 Géf
li-I Get
'rlëè
#
Products
1
2
J
4
5
~E.lEX
Sodium Bicarb
.sP·-101
~Ol YPAC Ul
Caustic Soda
4'-'hrome--Free Desco
~-D
~ar1
"3e1
¡vater
5
.,
8
9
10
~N6I .' , ,.' I
T-r'" ,.' '\ ''I.
.. Ie ..... u..~"_iGht
.. .., mI!IJ¡I, .
--
M-I )fimtl~ F1um LL.C.
72IW~sIFirj( AV'Ì.iif1'OO
Ancblìf<lí:@ìi!, ,\]JíìSU 91)501
(X)7) 214-556,~
{I)I')7' 279-1:i729 Fax
e
. Gëf Gèlé( S)'s-
..·tem
'9.2
&t1
4.2
0.1285
Nô
No
15
0.1393
In_
OütDut..1 bbI
ConCén-
Iration
Fièld.lb
0.02
0.20
1.50
1.00
0.20
0.2~
0.50
301.58
15.00
333.15
,386·1
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 22
Lab. ant
D.at
D.~
1.~
1.~
D.l(
O.2~
o.~
J.4.
15.
333.1~
386AI
9.2OCt
va&-
,.m18
Field. bbl
O.o~
o.oOC:
0.004
o.oot
0.0C<
O.Ooc;
0.001
0.024
0.01f(
0.95~
1.0oct
e
~
l
Lab. ml
0.01
0.09
1.43
0.63
O.OS
0.1<
0.50
ð.2J
5.17
333.15
35d
10/10/03
ColSit
1 bbl
0.13
0.08
3.16
2.96
0.11
0.49
0.56
4 ..f.4
2.09
0.00
14.03
DRILLING
FLUIDS
e
HS,E -- Iliamna 1 2. & 3
" .." .
e
HANDLING OF DRILUNG FLUID PRODUCTS
HEALTH AND SAFETV
I ,DrUHngcrews should beínstructOO in me proper procedures fOfhandling fluid products,
2,PersonaJPfotectÎve Equipmoo1 (WE) charts should be posted in the pit r~. the mud lab.
and the office oftbe Dtilfin~ F()finm:\.
. ..' , ". - ... -,. . . "m!-,.
3 . PPE must be in good\.vorldng (tî'der and be udlizedas rect}m1Dended by thePPEcharts.
4. Product addifÍ~m.iJ. sl'M;Juld be made \~th the iutetI! to u.,,,e oomplete unit MIOUí1tS; of pt'OOUi(.i~
(sacks. drums. cans) ~ Itluch as l)t)S~ble in t)tderto ¡uinhï'ti.ze inventory ()f ptU'tial units
5. Ins:w'ealIM$DS sheets are "ut) to date and re.adHy available t:Orw'Of'lœrs t08.l.'Ce$S Î(u'
Intòrntaboli.
ENVIRONMENTAL
1 ,Insure that all ~)roduet stored (,)tArstde lS f)'fOtected from tbe weather
2. IJ() t}utstQre I*hal W11fS butcks, etc) outsu:fe without OOdttl.QI1a.! pirotechOí}
-'. When tran!itè'1'lug fluid and Oil' (uttingsft'()t'n me rig t~') tallks,lusureaU Dt)$eS are l'Jtt)pe:r1y
secured.
M-I DriUìt'S Huíds L.L.C.
'121 WIo\'i¡;;1 First A \'(.,'fID¡t¡!
JI,ndl)f~" Alaska '\)9)1;) I
(901) 274-5564
{'907) 219-6729 Fltx
DRILLING
FLUDS
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 23
10/10103
e
HSE
e
-
II ¡am n a 1,2, & 3 (Includes contingency products)
Product
Function
M-I BAR
IM-I GEL
løELEX
IFLOVlS
IDUAL-FLO
IPOLYPAC
IHIC
IBlOZAN
IGUAR GUM
ISAFE-CARB F ,M,C
ILOWATE
INut Plug
I~ Seal F, M, C
IMIx II F,M,C
IRESINEX
ISOLTEX
IASPHASOL D
lcesco CF
IVENTROL401
=:-IG-SEAL
~111l! l'nOO!l Ld.".L..
ì21Wß~lFíl:!ìt A\'m'we
l\l1cl~, AJa!lka ~jil.) I
(9(7) 27;4-5564
(907) 279-6129 Fux
~.wld~j Agent
~'h-i!!f.Î!Þ'!~'" control
1:r:mrt'\'¡U(~' Extender
L'~,~.
.. n,.c;¡,"l,!·t':u.fì:4
1;~lriIÎ!if~rqÎ!i Starch
1~!Im Loss Reducer
..'J.i:'; Circulation Mate~
rim
~'lJ.i~ìJ..iler:4'
~'J~tt:4'
~...... ~r."~. and weighting
~...
~¡HJ'IiT*1 agent
I.ì~i-~ Circulation M ate~
I'if.1
1.,iï}:'1;.1 circulation Material
1.'J..i--i circulation Material
~: Fluid Additive
I:!'lí:: stabilizer
I,:mr:; Stabilkzer
l.l~"J.r~t.i"-;1ìF
(:m¡ìm~'
~. Fluid Additive
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
P~lk::m Hi11 Oil :mò G:I!': Tnc P:lP-~ 7.4
I
·
·
II
·
II
II
·
II
II
·
·
·
II
·
II
II
·
II
·
II
, ..,
r~1flIr
10/10101
e e
HS,E - II i amn a 1,2, & 3 (Includes contingency products)
Product
'CAUSTlC SODA
'CAUSTlC POTASH
IBORAX
ISAPP
ISODA ASH
SODlUM
BICARBONATE
ICITRIC ACID
IMVACIDE -
IGREEN CIDI 250 .
DEFOAM X -
BUBBLE BUSTER
I KlA-GARD
ILUBE TEX
ID-D CWT
Concor 303
SAFEKLEEN
ISAFE SOLV
SAFESCAV NA
SAFE SURF 0
soDiU M 'CHLORIDE
,.._,,---- , "",.,,,
POTASSIUM
CHLORIDE-
M-I DftUìß! Fluid& 1..L.C.
'72 J. We:!rtFirst A\';eal\æ
ÁJ1(;ht1fi!\8e, Alaska 9')501
(~),J7) 274-5564
(907) 279-6729 Fnx
Function
~.~., ,. jOii'V'l""-'
r.o;~'I~~;!f1hl~' ....... IV VI
~= Modifier
~wr.u.. Borate
~i';!=Wt~I~' Pyrophosphate
'~'~tr=VlJ control
~~Ifcontræ
~: Adjuster
I:l~r.[::;
r:'~r·
l·n'i,~L.~.:i
1.T;U'f;rm~ '
1~~t.J;I'm~·
l;iimr::: Controf agent
....,mrilf;:¡· U.
ItI:} t=!ít [;oJ. r
(Ç{l.ßU I I nt1ìbìtor
I!JiWW!jftuld additive
tt:~n'J[:}u"I') fluid addi~
~'r!,riW scavenger
~. '.'. !.!':m.]" fluid addi-
~
~...,...,. .t~nItJf'fluid addi-
~
t;;,i'mr:.: Inhibitor
Doli,.."'..... u.¡n A'¡I ...."~ n.....C' Tn,..
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Dr.tITO 1,
-
-
-
PPI
x I
X I
I I
I I
E I
I I
I I
J I
J I
J
-
J
J
J
J
J
-
J
'lÌ2
1
'I
1
'I
J I
H
-
J
E
I
-
...,..... ........>..... ... .......... DRlU.IIG
,~ FWlDS
10/10/01
e e
HSE -- Iliamna 1,2, & 3,
HAZARDOUS MATERIALS IDEN'nFICA 1101 SYSTEM
(HUll) HAZARD RATINGS
.. - &.wire hamrd
3 ~ Sertoua hazard
2 - Modinté hazard
1 - Sight haard
.. - Minimal løiard
IÍ M Mlerilk í'IiId to the hulltl rating Îfldici!Iéš that ,. chronic hazard 1$ ~èI_d WiIh the m~L
MMIS PERSONAL PROTECTIVE EQtIPMÐlI' INDEX
A - SøfeIy Glauu
B - S8féty Glauu. GlìWü
C - Sa. Gl8saê&. GlóYü, S:ynlhelic Apron
Ð - Face Shield, G40vø,Synthe1ic Apron
Ii - Safèty Gltl!&ä8, ~,~t R_ImkIf
F - SiWty GIau_, Gtov_,$yMhelic Apron, Dwt Røpîr8ttlr
G - Safety GI.._, Gkwés, Vapor Respirator
H - Spltih Goggkm, Glòvø. Syt'llfï&ticAproo, VC'tfJ« Rapkal«
1- Safety 01..., Glow., Dust and VapOf RlMIPirmor
J - Spl.... Gog~, GjOYeS,Synthe1ícApron, Du:at and Vapor Respirator
.K - At Unit Hood or Pd_, Gloves, Full Süît. Boots
X - ConSUlt your. $UpéfVisorØbt apedat handing ditttdion&
M..I Drillin$ F111¡,j" L.L.C.
'721 West Fir&it A'!l'ßßœ
.Â.flC1){)r., AJ¡¡¡WI {)It)j!H
(901) 274-556,.
{(~)1) 279-6729 F.~
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 26
.r'P"fj. .......... ..... .... ... .. ........... .....rJRII,LIØ
,~ FWIIS
10/10/03
e
Project Team
e
Iliamna 1,:2, & 3
t
. . '. .
I ." ['-'.' '.' J............ ,.. .... (::r"'''__
PI ;:¡~¡: 7::~;:~:('1 ; ~ ':.. ót¡lri:·MaDàger
~--~- --.. -. -,-
C1œ y,!':¡k I
w_......p
Willie RiJ~lm¡J
t
]..
.........................................'.......................................................................................~............................................................................'......t;¡........................f\I'.Ii......................,'.......·.....·.·..·...·.ü..·.·..·...........................................'................,.......,................................................'...........·....·.1
.:-::........'--......--..'....'-..- - ,'",.-',',
'J'tI(¡b~Ïêê·.··.··.·,·.······.··..·
..-.-, -.. .,..",.
'IIIIF-:'.lll . I
. Ml Projoc; Et1~ìí)t.", ;ißJd /1.'>.::1'1 &:I'\'j(;,¡! Eílg~t)t.""1 wiU ¡;(k"l'dj~t;¡ N'I\\L'Cn 11fi.! I'if!. Wilro!t'IWO, and 1hz
:!i.H fidd eugitTIC\lls.
. Wdl r'mg;lte'.\ì:s \¡,ìJ! lx' m(tlulüitex! to kx,k fill nt1~ ¡;Jläfig..~ ....lü¡¡:b \\iII UnplÚ\ê the 0Ifù:iL'1T1C\ of lbe ü)L"ta-
Ü"'I~ (It ;1\'\:lt b\,ublf~.
Project 'rCnAn
CraigBlekl'
I"ítk
Dlltrf£tM~..
Deen Br,iIII
L«:De1I1!Ö
Tedt Sienia!
Gu Wlk
proJeetEø3lDee:1'
W'a....1lí1Ule l'tbnaJu
Fie" E~r
J'i1tf¡d E.eer
PIdIU, Hupa
MOIlte Kanta
M·I DIi:mtll;!.,Fìu¡d~ LL.C.
721 We.¡¡IFil,¡;t A\'L~Ì'œ
Ancbüra~, Alalika 99511J I
~91)7', 274-5564
(?::)1J 27',),,6729 Fax
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 27
\V ork
9t7 2'......
91Þ7 27....!OOJ
9t7 27....s..~
9t7 71'-1JQ1O
9t7 17"~MW
9fi7 :174-5564
Cellular
9ð7 U!MJi96
9Ø121J...Ji4íJ4
907 117.
9Ø11~24:!18
DRILLING
FLUIDS
10/10103
PROPOSED FRACTURE GRADIENT AND MUD WEIGHT CHART
PELICAN OIL AND GAS 1
OFFSET MUD WEIGHTS, ANTICIPATED PORE PRESSURE, FRACTURE
GRADIENT,
MUD WEIGHT, AND CASING PLAN
l 4000
~
G/J
Q
~
.r:
i
Q
2.875"
6000
7000 -
8000
9000 -
8 9
10
11
13
14
Mud Weight, Pore Pressure, Fracture Gradient (PPG Equivalents)
12
ILIAlVtNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, me. Page 29
Gassy Coal
Gassy Coal
t CONGLOMERATE
t 88~1 t 88~~t8~~~~n
. Coal
Coal
Coal
. Coal
Gassy Coal
~ A~~¥ 8~
Gassy Coal
Gassy Coal
Gassy Coal
. Coal
Coal
Coal
Coal
CONGLOMERATE
Coal
Structural Casing
,. Surface Casing
Production Casing
Iii! -"'ProductionTubíng
-PROPOSED MUD WEIGHT iUAMNA 1
ANTICIPATED PORE PRESSURE
EXPECTED FRACTURE GRADIENT
Forelands State A No 1
KUSTATAN No 1
,_@wvwa«wwMOKUAKIE No 1
ANTICIPATED CONGLOMERATE
ANTICIPATED Low Gas COAL BEDS
ANTICIPATED GASSY COAL BEDS
I I I I
15
16
20
17
18
19
10/10/03
CASING PROGRAM, CASING SAFETY FACTORS AND HOPE RATINGS
PELICAN HILL OIL AND GAS INC.
ILlAMNA CASING PROGRAM AND CASING DESIGN SAFETY FACTORS
CASING RATINGS AND DESIGN FACTORS
STRING CASING OR TUBING SETTING FRACTURE FORMATION ASSUMED MUD FORMATION GAS
DESIGNATION DESCRIPTION CASING OR TUBING RATINGS DEPTH GRADIENT PRESSURE WT PRESSURE GRADIENT MASP DESIGN FACTORS
TENSION JOINT TENSION COLLAPSE BURST
SIZE IN WEIGHT IN RATING IN COLLAPSE BURST @ SHOE IN @ SHOE IN @ SHOE IN IN PSI PER based on air based on with Gas
NAME INCHES IN PPF GRADE POUNDS PSI IN PSI IN PSI FEET TVD PPG EO PPG EO INPPG PSI FOOT PSI weight empty pipe to Surface
STRUCTURAL 13.375 54.5 K-55 853000 853000 1130 2730 80 10.5 9 10 37.44 0,1 29 195.64 27.16 94.14 e
SURFACE 9.625 32.3 H-40 365000 254000 1400 2270 550 14 9 10 257.4 0.1 202 14.30 4.90 11.24
PRODUCTION 5.5 15.5 J..s5 248000 248000 4040 4810 5500 16.5 9 10 2574 0.15 1749 2.91 1.41 2.75
TUBING 2,875 6.5 K-55 99660 99660 7680 7260 5200 NIA 9 10 NIA 0.15 1749 2.95 2.84 4.15
MASP Calculations are based on the anticipated formation pressure minus a gas gradient to the surface and assumes the well is completely unloaded for the purpose of this calculation.
Collapse Safety Factors are based on the Assumed Mud Weight Hydrostatic with the tubular completely void from the surface to total depth of the string.
Tension Safety Factors are based on the Air Weight of the tubular string wrth no buoyancy.
CASING DESCRIPTION AND SETTING INFORMATION
STRING CASING OR TUBING TOP OF
DESIGNATION DESCRIPTION THREAD STRING
SIZE IN Wl:lGHl
NAME INCHES INPPF GRADE TYPE FEET TVD
STRUCTURAL 13,375 54.5 K-55 BUTT SURFACE
SURFACE 9.625 32.3 H-40 BUTT SURFACE
PRODUCTION 5.5 15.5 J-55 BUTT SURFACE
TUBING 2.875 6.5 K-55 EUE 8 Rd SURFACE
BOPE TO BE NIPPLED UP ON TOP OF EACH STRING
SElliNG HOLE STRING
DEPTH SIZE DESIGNATION
PSI
FEET TVD INCHES NAME TYPE SIZE EQUIPMENT RATING
80 14-3/4 STRUCTURAL DIVERTER 11" HYDRIL 3M
550 12-1/4 SURFACE BOP STACK 11u ANN & 2 Rams 3M
5500 7-718 PRODUCTION BOP STACK 11" ANN & 2 Rams 3M
5200 NIA TUBING BOP STACK 11" ANN & 2 Rams 3M
e
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 30
10/10/03
e
e
BJSER~CESCEMŒNTPROGRAM
P~í1Id for.
Ji\m MÖIMIly
Projed Engi~
Pelican Hill Oil & Gas, tne,
Sètvice PoInt:
KéI'1at AK
Bus. Ph(Jnì!:
fäJC
WJ
Pröpcal No: tOO11i968F'
Pelican HII Oil . Gas, Inc.
Iliamna No.1·.. REVISION
Pélfœn HII RIg
IlImnna FI.ld FkIfd
Anchorage C(JWìf)', Ataskã
Odôbèj' 9,2000
Well Recommendation
Pt'êp¡ved by;
J.. JilyGiltnêf
Manäger, City Sal.
Kenal.A.tastta
Bus Phone: (901) 349-6518, Anchorage
Emal: prn_Objséti¡iiœt..oom
Mobík!: (901) 229-6536
: f'
"'~
-...
I? () \\' I~;RV I 81 ()N' ¡~
(901) 176-4084
(907)659--2:329
(907) 178-4087
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 31
S4!1rva ReprestntatwiR:
J. Jay Gamet
Managéf ,CiI.ySilIM
Kènai. Nash
Bus Phone: (901) 349-65 la, hlchorage
Email: jgarner@bjsefvicM.oom
M()bile: (901) 229-6536
10/10/03
~rName~ Pelican Hill Oil ,,,,..IM.
WeI Namè: lliamnil No.1·
Job Description: Conducmr Caaing
DMé~SeipMmbèr 26, 2003
e
WJ
Pmpoul No~t oo119958D
JnB ..AT A GLANCE
Dêpth (1VD)
Dèpth (MD.
Hole Sia
SOft
SOft
14.15 In
CalngSi!elWøight :
Puínp VIa
13 318'-', 54.5 Ibalft
13 3J8!! 0..D.(12.815'* .tD) 54.5
90gatSì
I_I Mix Water Requtfed
Spacer
fft!S1h Wamr
Dlhlity
Cêment &furry
SUrfâCé Pipe stuffY
Dlhsity
Yield
10 bbls
8..4 ppg
Dmplacement
Dispíacament
Denlity
WFU nATA
1 e stlldl.$
15.8 ppg
1 .16 cff$acf(
10 bbl$
9.5 ppg
~""'L.A It GFOMF.'TRY
.~mJ¡ "J~n f,-:-'-
@t)
1..150 HOLE
11 ;:¡~î~Ti':¡
.Tr~';;JTr"~''!'~ ~aT"~T';';¡;_··"" .,.
.' ..;',~.'. .i;;¡~_I.pJ.,.j~,u,to:r.
80 I 80 I
,.,,,,.,,.
SU8PI;NnFÐ .PI£a.
.}fJi'.1 ;;jÎ;:ji..trn
Il:;i ,:lI~fIlJ
,~J :j.:.'r;lmT~'" .i~l'r~Tj';:f;iÎr~l.
64 I 64 I
O.D.
iTiJ..;¡¡ 1,ij j
...~.
I 54.5 I
13.315 12.615
Mud Density
Mud Typo
E.... Static TémP.
E.... Circ. Temp.
8.42 ppg
Water Based
55· F
55· F
VOLUME CALCULATIONS
84 ft x 0.2109 tUft with 50 % èXcøs =
TOTAL SLURRY VOLUME =
20.2 cf
20.2 cf
4 bbI$
=
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 32
10/10/03
e
e
OpentIor Name~ Pélican HIli 011 & Ga, Inl!:.
We'll Nar:ne: IlaMI'Iia No.1
Job Deuriptiðn: CótldtJiCfdf· Ca&ing
Ðate<~ SeptémblK 26, 2003
Wj
Propoul No~100119958D
.FUlln SPF-ClFlCA TIONS
SpaCéf
F'tmD
CëmêM Slurry
10.0 bí8 Fí\ê$m Watvt· @8.42 ppg
VOLUME VOlUME
Cu.n fACTOR
AMOUNT AND TYPE OF CEMENT
20
J 1.16
II 18 uck& Clüš G CëmêM + 1 p1ti100 &8ek
FP- 6l + 2% bwoc Calcium Chloride .. 44~3%
~Water
9.9 bbíä DI8pÍ¡ijCémêM @ 9.5 Wg
ChptaCêhUìN
CEMENTPROPER11ES
SLURRY
NO. ..
15.80
1.16
5.œ
5.01
Slooy Wéfght Cppg)
Slurry YieJd (cf1sack)
Amount of MIx Waller (p)
Þ.mounc of Mbe Fluid (p)
RHEOLOGIES
FUtlD
Spacer
Product Mat8rial
QTÝ UNn'
18 sadœ
341bs
t gals
Service Chargu
QTY UNIT
12 hrs
24 hrs
19 cu It
Equipment
QTY UNIT
t 4hrs
1 job
1 Job
1 job
'RIIP
@ 5!PF
ao
129
Hð
100
2M
91
10ft
91
1&
36
2
27
fRICF FftTIMA T~
PAODUCTœ~
NE.T
AMOUHT
305.91
19.62
36.85
$362.58
Clau G Cement
Calcium Chloride
FP-6t
.
Product Mateliál Subtotal:
PRODUCT DESCRIPTION
NET
~
661.65
1.082.«<1
28.01
$1,m.os
Senriœ Supervisor. hourly marge:
Equipment Operator
Dry Btdk Matefiall SIIt\IIQ! Charge:
Service Chargu Subtotal:
PRODUCT œSCRlPTION
NET
AMOUNT
t,212.75
222.75
577.50
517.00
$2.530.00
$4.6I4.t.4I
Ce:rnentPump Casmg. 0 - tOOO It
Fu-.Løk. Cernënt Head
Data Acquisition, Cement. Standard
Fletd Storage Bin
Equipment Subtôlat~
TOTAL:
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 33
10/10/03
e
e
~oø AT A IU.ANCE
Dèpth (TVD)
Dèpth (MDI
Hale SIM
550ft
550ft
12:25 In
CìlslnaSI.!è#WtIWd: ~
Pun., Via
9' 518." 32.3 IbsJIt
:9 511" 0.0. (9,t)01''" .I.D) 32.3
1.351 gala
Tctal Mbc Water Requlnd
Speœr
frHÍI Water Spacer
Density
Tail Slurry
Tall Cement
Density
y1etd
Dmliplacemènt
Dilling Mud asptaCflflW'lt
Density
15 bbls
8:J'fjpg
1929"
14.5 ppg
1.48 chaCk
37 bbls
9.5 ppg
.WFII nATA
ANNUL""" OFOIIII=TRY
Jj;f ~i':!:; i:
,'J::H:lf];Lf ~ _j~UJ ~ :1;.H"'~'"
64 I 64 I
5~ I ~o
12.220 CASING
12.250 HOLE
SUSPENOEO PIPES
ÞK"',~í1TI
0.0.
.~o.
~.j;:i;;¡I:fW
~ ~¡ ;f'~~~11m;;ij~ 1II;~Jr::&Tl:;t;:..r~J.
I 32.3 I 5~ I ~o I
9.625 9.001
F~t Collar.. .
Mud DflMity
Mud Type
Ed. Static Temp..
E5t. CIm. Temp.
470ft
~t50 ppg
Wätèf Baèéd
61 * F
55· F
VOU I. CALCU. -"ON8
64 ft It 0.3092 cmt
486 ft )C 0.3132 cflft
80ft x 0.<U19êUft
with 0 % éJ(t:éß
with 50 % e)(c8'fl¡~ =
with 0 % ëXCè_
TOTAL SLURRY VOLUME =
19.8 af
228.3 cf
35.4 cf(inside pipe)
283.5 of
51 bb/!s
ILIAMNA DRll-LING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 34
10/10/03
,FLUID Sef-ClFlCA TIONS
SpaCM
FUJlÐ
Tail stuffY
~ce.ment
CEMENT PROPERTIES
e
e
VOLUE Vöt.UME
CU,," FACTOR AMOUNT AND TYPE OF CEMENT
15.0 bbI& FreshWøter SpaCflf 0 8.34 ppg
283 J 1.48 ill 192 $!ÏCk$ Type) Cement -+ 8% ibwóc E!'A.90 +
tt,,% bwoc f3A.10 + t gals/1M sac!{ FP-6t +
62..4% Fresh Wahw
37.0' bbfs Drilling Mud Di&plaCél'fiênt @; 9.5 ppg
SlurryWélght (ppg)
Slurry Yletd (cflsack)
Amount of Mix Watãr (\1P5)
Arnc!unt' of !lAbl' Fluid (gps)
Esìll'Mted Pumping Time· 10 Be (HH:MM)
Free Water (mIs) @2" F @ 90 " angle
Fluid lIm (c~mIn)
aU 000 psi and "F
C~VE STRENGTH
'1 111'$ @; 6ì. pi (psi)
15 hrs @62" F(PÛ)
24 hrs @2 62" F (peï)
120 hl'$ @ 62 .. F (psi)
RHEOLOGIES
FLtßD
Spacer
TaU SIu«y
ProdUd' M_.'
QTV UNiT
1ü
1èa
14441bs
131bs
2 gals
192 sacb
hlvice Ch8lØ*s
orv UNrr
12 hra
S6hn
. ZSS cu ft
n;Jllp
o 55'"
@. 6O"F
SLURRY
NO.1
14.50
1.48
1.04
1.05
4:22
0.0
8.0
50
500
915
3200
___ ___ ___ -1I.L --L- -L-
129 100 91 91 36 27
158 117 104 86 59 45
PRlr.1! F-~TIMA TF
PRODUCT OESCRPnON
Cernent Pfug. Aubbet, Sóttom 9-518 in
CernEmt Pfug, Aubbet, Top 9-5'8 in
BA-90
BA-10
FP-61
Type Cement
Product Matélia' SubtDttll:
PRODUCT œSCRlPTf,ON
Sèt\ìÎCè SupefVÎSiOl - hourty Ch8l''Qè
Equipment Operator
Dry Bulk Matet¡øSeNI:ceCharge
,SeNΜ Chargea Subtotat:
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 35
N1!T
AMOUNT
264.&5
143.00
849.19
525.91
73.10
1,842.72
$3,699.13
NeT
AMOUNT
661.65
1,623JU)
42.1:.09
$2,105.34
10/10/03
e
e
.aßUI AT A GLANCE
Depth (TVD)
Depth (MDI
HoIellze
5,,500 'It
5,5ooft
7157,5, In
c.lngSImlWeWrt :
Pomp VIa
51J2In, 15.1 IbaJft
Tötal Mix Water Required
'WIHghlmd Spacer'
MCUD Spaœr System
Density
1. lead Slurry
Casing DñIed Section .. Lead
Density
Vi81d
Tail Stuny
CMing..oñlhMI SactionT.D
Density
YIoM
1!iH1gø1,
30 bbls,
10.5 ppg
UUs8Cks
13.5 ppg
l:82··'dfMck
'......",,,"",,.,.<
~,,"'''
.d.f..'''''··",·,---.......,
,,//149 sacks
/
( 15.,8 ppg "
\ 1..16 cfIMclt/
., '"
"~..,."""<>,....._"-,--""-"""/<"'.."....
œs·. -....'. pIøcemønt'... ..... ..
.' .""'-' ',' .'..,.'
, .' ", ".
2 IB,LS 'C..nt ... Drlling Mu
Density
131 bbls
10.Q ppg
ILIAMNA DRILLING PROCEDURE REV IOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 36
10/10/03
e
e
WELL DATA
ANNUI..AR MOMmv
, . .
III ,
9.001 CASING
1.875 HOLE
-·¡T::{~I:mi
~;r;'!;1fJ;1~'~ 1I¡¡ur;JJr;¡~iiF~.
I 55Ð I 550
I 5,500 I :5,500
SUSPENDED PIPES
.Jtlí~r;¡i;r~~' :ij:¡~i;m~
~ ¡r,. '! l~ ":I::~JJ~Ç,;Iiï." Iffi1tJ;srIJ:f¡¡rtTJ1I
5.500 1---'4.960 I 15.08 I 5,500 5,5001
MudDBMfty
Mud TDé
EM. Static Temp.
Est Cke. TMnP.
10.00 ppg
Water Basèd
113 Q F
97 t' F
VñlU,. CAJ r.... A 110H£
2.000 It )( 0.1133 dft
1.000 It )( 0.11'33cn
win 0 %êXC.., =
with 0 % excMt =
TOTAL SLURRY VOLUME =
346.5 cf
173.3 cI
519.8 (if
93bbJs
=
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 37
10/10/03
e
Opendiør Name: Pélìclm Hill 011 .. Gu. Ine.
WllIIIaimè: lìlamna No.1 -REVISION
Job DKcriplion: Cat.i~11kn:I Casmg Sèdlon
~è~ ~bef9.200~
FLUID SPfCFICATIONS
Weighted Sputéf
FWfÐ
VOLU_VOLUME
CU.fT FACTOR
tlit lead Suny
347 I 1.82
Tall stUffy
173 I 1.16
fÃíiiplãCéMéhI
CEMENT PROPERTIES
Slurry Weight (ppg)
Slurry Vield (cflsack)
Amóunt of Mix Watét (gps)
Amount of Mix Fluid (gpe;)
Estil1'liílled Pumpìng Time - 10 Be (HttMM)
Estimated Pumping Time -100 BC (HH:.MM)
Free Water (mts) (I 9ì" F 0 45 ., angle
Ftuid l.øø (ccí30rnin)
at 1000 psi and 98 iJ f
COMPRESSIVE. STRENGTH
... hrs 0110" F (paí)
4.37 hm 01'10" F (psi)
6.35 hm @ 110· F (psI)
7.51 hrs 8110" F (PSi)
8 hrs 8110" F (Psi)
12 hrs @110 ~ F (psi)
24 hra @ 110" F (psi)
RHEOLOGIES
FLUID
TEMP
e
':~~
r.¡u
~HOì: îOOt7995.
30.0 bbf& MlCs..mSplllcw Sytmm + 141bs1bbl
R-3 + ~tø.baJbbI F>MM1!lÍurn ChkJridè + 30.15
lb&Jbbí Bentonlû + 1191~ Sarltê @10.5
A~AND~OFCEMBff
= 191 sacks CI_ G Cement +tG%, bwoc BA-to
+1% bvIot Calcium Chloride '* 2.5% bwoc Fl-
62 + 0.2% bwocASA-30t + 2 gð1sJ1òO sack FF>-
6l '* 0.5% bwoc SodhJiIn Meta&1lícaœ + 64%
Fruh Wøféf
= 1491aca Clna G Cemèft + t% bwoc eA.-tO +
0.1 % bwoc R-3 + 2% bWow Potasllum Chklride
+ 0.6% bwt:Jc CD-:ì2 '*' 1 gltt&J100 sack FP-ðl +
O.~% bwoc Sodlwn MmsØlcate + 34.8% Frøh
INater
131.4 bbls 2 BBLS CémMt + Drilling Mud @ 10
ppg
SLURRY SWRRY
NO.1 NO.2
13.50 15.80
1.82 1-16
7.21 3.92
9.21 4.92
4:tO 4:08
4:35 4:22
0.0
1(1-0 14.0
50
50
500
500
517 972
923 2188
t731 :W32
soa
300
2M
I -1-
100
1 at lead Slooy @ '96 ·--f 86 SO 37 24 12 12
Tall Slurry @ 98·~F 2$0 152 108 62 16 13
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 38
10/10/03
e
e
Opi'nfðr~: PeIlt':8n HlI Oil & GM,IIìíé.
Well NenírIt: l&amna No. 1 - REVISION
Job Description: C.g.-Drilled CMlng Sedion
Didèt ~r g, 2003
....' ! ~ J.... ,............ ...... .. ".. .. ........
~
"''"'--''''-''-'-''','''',',.-.,_"-'-',"',..-,:;,,
~ No¡ 1oo179958F
,PRICE ESTIMA TF!
E4uipmtRt
QTYUNIT
Equipment SubtlJtail:
TOTAL:
2.557.50
222..75
517.50
1,034.00
$4,391.75
.4, '127.011
1 .t.
t job
1 Job
2 job
CRent Pump Casing, 5001 - 6000 It
Faa-Lok CtmèñI Heed
Data Atquidon, Cement, Stattdafd
Field Storag& Bin
I'Ifotø
1. Final êhãtgél3 to be baHdon ac::fl.j¡a hi)UfS, pré$sUte and møœrÎàls blended for and 01' cooaumêd oo~g
cementing opera.fof"tl.
2. No stand-by êhätges w1ìI bê Ìficurtéd for ttOn-opêfitting dayJi bêtweéI'JWêlls.
3. Room and board to be provided by Pelican Hill 011 &. gu. Should ibIS not be pMSîb4e remote locllltion
chørge& fot personnel Will bé· ìncurred.
4. Tral1$þottatió11 fat' eqlJjþmêrM and personnel 1n.-11d from lOoCåIioo to be provided by Peficán Hilt 018. Gas.
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 40
10/10/03
ILIAMNA DRILLING PROCEDURE REV
Pelican Hill Oil and Gas, Inc.
R..3
A.1o.w temperature relardåt uød in à wide .range o~ slUrry form..daIiM$ toe:'dèind the stutty 1JIj¡lck.ening
tin'tré .
Sodium MelâSillicate
An èxter~er u::g,ed 1ø produœ an economleaJ, low density cement slUrry.
100CT.doc
Page 41
10/10/03
Potassium Cf!1loridif!
Agf'añUfar salll usèdki
reOOCé cliãV$wclling œU$éd by wá,1er-bilí&ê cementing
'iluide
P·olauium Chloride
Agranuliat $ålt Ij~èd to reduce cla~ 6Wèllîng cau&t!id by wtl,ter-ba1õe stiimulatii:lnltüid$.
Mcs..4
A. wrbldentRow spacer system that ;prevet1t& water
water-Voféts úiíè c;d;inQ to incréasê bonding.
and oil-base mud and cement contamination and
Ikþidthì!lt
œCrêi:U¡èS fbslmll1g
F·P-6L
A. clear
FL-&2
A patented dry blend of water sòkJbkI polymef& that ate fOfmotated to control the 10/IiiS of ftoid during
~menting opêraüons. A _ê,fsant ànd bondmg additive ate prøportiol'1éd to deliver consistent
pérlornmnce and contrôlftuld IOâS ihþnltlaty and squee:te cementingapplK;á'lions at low 10 möderale
n
sbrief> dOfi~g tnìlC:îrl!9.
Clns G Ce«Mnt
Intendéd b iU&E!' i!iìS is basK; celtlêflf tom sur1'Doè tó 8000 ft a$ ltIanufadUfE!(.L 01 (;00 be U$Ðd 1NÎIth
accek!ræor¡ and retardms to ¢Over Of 'oNide Imge of 'Nelt depths átld ,*mperatutes
Calc'wm Chloridè
A þOWdéred, naked or péiletized material used tô deae;d;e thickenîng time and inCfeáSe the ratt! of
strength deV8lOþméfJt.
C042
A pøtënté1d, fteé~lowing,
retnêd\Îal Cémênting.
Ekmtonile
Commonly
wtttér
ca.ëd~, it Í$, á clay maÍétial used ãs a cement extendér and toccmtl'oi exceníve ffêØ Wâter.
solUble potymer
that is an effiëten,t
and effêdîv. diSp~nt for
ptimar\, ëìnd
Barite
A. natuf'8l1y' oéCufitl,g mlnlllfa~ (Barwm Sutf81è). Et ÍS!Vìí'ildieJIV Ul&êda$ â ~ghlJng thtí!llÌal ÌI1I CGimènt
and oœàsionatly in œm¡éNf;lurriu, It can yJe,ld ì!II 8lurryœnæty in œœssof 191bis1gat
~aoora
DA.-
An ncm-œmpaœdslbfumelhM produces hlgih èornpl~'èa1fèf'lgth, low dmaily Cènmm 8luwie,
Whh::h plfeVèf'lt annular gas ml1Jra1km by reducing sLUrry p.me:ebilitJ. It can be uud In the low 10 high
tempemlUfê rang..
BA..10
Iß'lPt'õvu, cement bending md actliìs ÈÍ maim ftow controlagmt.
and dM6d skirrl. Dt ,modlllfate tèmplllfalUf'é*'.
It
Cí!ln bit tilsed lin Igfttwêight, _ndard
ASA..a01
Additive used to reduce or
élirinm tü~r and Iff/OIing in Cí!!mént skim...
PROnUCT ~Rr.'RIPTlONS
e
e
e
e
CONDITIONS
iu¿j·· .;:J .
?! .
-"""."""-"'",--,,--,.,,'-""'.-
. .. .................. ...
8J Servicast ptft'orml1nœ of urvices M'íd sa. of matldals iaøptèl.sly ctmdilloMd upon the
applicablity of thä Téfm& and Qaadì:ÎOAtl Cõftlainäd In thä current BJ ..,dcn Price Book. Thä
TIffñ8, end CotvJItiom¡ include, among other thl.., an indemnity in favor of BJ Sètvl\ces tom CUstòmet
for damage to me 'well bore, ifaørvol, damage, Ion of the hole, blowouts: and lose of conlrol of the well,
even if CMlsed by the Mgligence or öltier fauft of BJ GenAe.. Thä Tem'iêand Conditions 11813 Imlt the
W'8ff8n6es pt(tí¡llìded bylhe BJSêrvlces and the remedlin tõ whidh CustOß'Mír may be enHed inh event
of 8 breilëf1 01 'WIIfranty' by BJSêr\lfœs. for these fnsooS, Wé SIrOl'IÐly recommand thai you c8fliMly
revlfilW8 copy onhe Terms and Co/'tdiìliorrs. If yea do nOC have a copy of the BJ Services Price Book,
you éãö Vièw1hè· Tèl'fltl àö.d Ccmdltion& 00 BJSèfV'ÎCèS Wèb Site, WWW.*è"~ðM.By
~tlng that BJ Servlcø. ¡perf01rm ....lêrvk:éS dèsctib«lllerefn, CuistoIMr acknowleda_ that
Iìldí Tèi'mš.áIftd Cöndiliõn. aM appllcäblè to"" HfYices. Futlhêr, by NqüM.tiJifl thè s.rviœs~
Customèr warrants that lis ~ on lhê wel location orõlher Hrvice sb will beftlly
.f"¡(wlad to acknowledgè weh Termsn Condhkms by éXì!iCuting ill Field Receipt or othär
document presented by BJStmtice& œnlaftlng such Term& and Conditiofts.
In Ihä Þêhtthat CUstomêt and BJ Stmticu have èDCübId a MaMer SenticesAgreement f:iOV8rihg,
the wo... 10 bè pe.fGj1t1èd, such MiHterSefllÎCes Agttlèrnent shaHgO'ltêm in placè of the TermsllAd
Conditions. If you are ÍI1tMU1ed in êR1aring into Mastär Service" Alf8øment with BJ Seryice..,
plMH·CQft1ad us "'rough 1M "'Co BJ'" button on the 8J Sänrices Web...
BJ SERVICES CONTACT INFORMATION
BJ Services Company Kenai District - Operations Supervisor
· Ed Post - 24-hour dispatch (907) 776-4084
BJ Services Company Kenai District - Service SU1>ervisors
· Marshall Brown
· Robert Moore
· Smokey Poage
· David Wallingford
Regards,
Jay
J. Jay Garner
BJ Services Company, USA
Alaska City Sales Manager, Pacific Region
(907) 349-6518 Office
(907) 229-6536 Mobile
email: jgamer@bjservices.com
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 42
10/1 0/03
LOCA TION LAYOUT FOOTPRINT DRAWING
RIG LAYOUT DURING DRILLING BELOW SURFACE CASING
--.-
I·
I·
Pill Pits
40'-0"
SuctionPits
-~-_...._---_.-
- ...-. - ---.155' -0"---·--
-I
Solids Control
-1 r---------...... -.4:~··----·1 I~
Derrick l I...:~ & i
Derrick Shaker & f A.f/f l
Degasser Cones Gas ,/ ,
.. . ;.;. 7··;·'-;-'·"·'~':-'-·;:-~:; 'f;. I .;--;:,-~ / 8' Atm¡..4enc Vent
.~ .~.' . . ll~TO,ØOke~.n~oId ~. _22'-211116"i-
,.. I ".:' ) .'~ -, ~', .:: ~upt~¡~
. .. ..._.. ·W'·- ~~...rf ø 'Ô.å' Tesco
-.-- -- -...........-... --. - - ...... -. ..,,;¿-, . '- ~,~w:/!Þ Power 8'-0"
L._:.._,~:_:...:,_:.:__:..:-,..¡~~t:...:,~_:~-,--,_._~::.....,..::",l:I,-,-.~:;::.. V ~ Unit.-l
j(.~:::: ·~~W·:;f!'i l' 50'..0"
n;"'.'· .,,,,:...,,~.: L;,:--- -.'\.
, 'i ".. .'
1 X '¡: .~g Floor
1"·;1 ....
'1,,/ ( , ",:_
.. .. .. .: ... ":' .~ . ~: .',:::' :.: : '.1:
e
--.-
t-8'-O"--1
I
. ___....__..... _..._......._.__.._._n_n._'__..,._....___ ___._.. _. ....n ..'..
:....: _ ..:.&.;.~. :___.'..:.-.. :'_.":':':-:-=-":'¡':'.-':"-_-='!..-.~':":....! ~:.....:..a....-:_':"";"':"":'.:...:__ .. ..... .
3x~:' ", ::;
t:,,,,~ '.. -:
'.0 '[3x4 ..: ·1
:. ''urr~. I ::
.. ." ..... -. ..... ...
--.-
1-8' -O·--+i
! I
I I
I Tool I
House
7'1:-0"
33'-6"
Oíesel
Tank
20'-0"
I
I !
, I
_L I
~-
~
-2-
D
m
BUNt<ER
FOR
DRlIMS
~,
GASaJNE
TANK
'-------./
-2-
'-------./
I·
'1
'.- .."1· :.... ~....~.:.." "'. .... '.
~~
-9'-6"-
..---16'-0"-----1 ---16'-('1'--
Generator 2 I
I L~J~
Generator 1
-SO'-2"
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 43
..
. ....,
CatWalk
'. ..: I::·: ~
.. . .
-.--
..
'"
~
~
to
1_-------.- ___.,__~,_.L____________.
16'-0"
H20 B
Tank ~
20'-0"
Pipe Racks
--,._---~.._.,----..__.
comp~S$or --'T
8'-0"
~
----1
e
. -.- --- -"-------.-.--
30'-0"
\----~I
-2-
-1
TIn" ~ "'''''''''"...
':>_::'-'-'"~.,,, .-,
"",'" "",,": ...'.---
...""'" .. ..
.1Jt-..
:: :;:"Hji,o,' .~!$_:'; -:-~-."-<_:--.:_ -_::-;':
'1n~" - - 'n, :'.. .. -:'- __ _ ,_ : /;<.. __:_~;'; <.~' :,,:., _ :",:.
.:._'_"".',~:,- '-'o\: .~1,,~,-__,--:~,
4 .'. . .!œ ~'''WN;;'''.W",~·.
-;. -;--/::-'<->--'-"_::',Miilbiaae;:AI~;;;
10/10/03
RIG LAYOUT WITH DIVERTER LINE IN PLACE
Solids
20'-0")1 .
t1!)% rrictPe rrick
DegaS~aker &
'.'O'o~~'"'~='oO' h'o'"o=·~oO~_~" """dT~'oo"''''~o~''''-''''.~'.'~"'''.;: ,. ",,~,..~,,~~,O":'::-'.~-r- ,."'~-~'
, r II U I I' L;.;:'-;~::;.,"': ! c'
I ,..,.... ,..' '.:
~. eP' . CI,r;~ f~l d~ ¡~~I~]l
I H __!If' -.c, .- --- - ,lIIJ ".. f··
F \fffip ~_: ,I ~..', -;.: ."
. I IT'] ill I 1;-· ,
i· l~~! ¡!:¡¡':"·:::i::~:;-:~;;~';~:~~:,o:; ~;iiU:!~ :;¡ ,Ii '\.1,: ¡¡ rr:¡ ¡:.:,,:~~:;~~-;=;¡ ¡¡:i; i.i;: i!' ¡!', ¡::::::': ;~~: ~:: ~;:¡·ii;':+~ H
~ ~. H,Ig-:~'
- ~ 00 I ,j]tl~~; ,__
- IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIJIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII~ 11I1I1111111111 11111ftlllllllllll~
.
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 44
/
.
.
/
17'-3 7/8"
10/10/03
I
Tesco
Power
25'-œJnit
Cat Walk
e
.
4'-0"
-
.
e
e
e
...
SPACE OUT AND DIMENSIONS OF DIVERTER WITH TWO 13--318" SPOOLS
...
...
a. ... to
RKBtoTop
Pollution Pan 16
Inches
~
Inches
RKBto
Rig MAT
150 Inches
from RKB
to Ground
level with
Two 5"
MAts
...
...
...
RKBto
Top of
Hydril 54
Inches
...
...
...
Height Top of
o
Bottom Of Item
o 0 Rotary table
..
...
...
..
8
8
o 8 bushing
8 16 SPACE
38 16 54 Bell Nipple
... RKBto RKB to
~ Top of 12"
Diverter Top of
Top of Line 24" SUB
DSAF 120.4375 BASE
93.75 Inches 116"
Inches Inches
RKBto RKBto
top of Bottom of 39.75 54 93.75 HYDRll
DiverterDrì 12"
lling Spool Diverter RKBto
98.1875 Line top of 5" 4.4375 93.75 98.1875 DSAF
.. Inches 132.4375 Sub
Inches beam 111
Inches
---.-
RKBto I
Top of 131 -.------I
5/8" SLIP +
lOCK I
Csg ...
Head
147.1875
Inches
22.25 98.1875 120.4375 Top of 12" Diverter Line
...
...
12 120.4375 132.4375 Bottom of 12" Diverter Line
--------
RKB to 13-
3/8" Cutoff
165.6875
Inches
14.75 132.4375 147.1875 Top ofCsg Head
RKB to
bottom
of
Cellar
222
.incl:as-
18.5 1471875 165.6875 13-3/8" Casing Cut
+
...
563125 165.6875
222 Bottom of Cellar
45
46
140
16
1
r
Ton of Rotarv nrifJ F100r
3-3/8"
54.5#, K-55, Buttress Casing Set at
...
80 feet RKB
v
..
t
e
e
A
æ
.
.
m
þI
ITEM Dimensions
CELLAR TZ'Diameter
RIG SUB 70" Wide by 7'Z' Long
13-518" 5M Flange 26.5" Diameter
11" 5M Outlet Flange on Diverter TEE 23"
11" 5M by 150 RF XO 11" Long by 19" RF Flange 00
Series 150 RF Flange 00 19"
47
e
e
SPACEOUT OF SURFACE CASING NIPPLE UP WITH SPACER SPOOL FOR TBH HEAD
a a .. .& .& .& a a .& .& HeIght Top of Bottom Of Item
0 0 o Rotary 1able
8 0 8 bushing
8 8 16 SPACE
RKiITõ
Top of
HydriI
54
.I/l!t§L
38 16 54 Bel Nipple
..,
'RKB'iiï
Top of
Rams
93.75
Inches
-.
39.75 54
93_75 Hyåil
'Ri<ã'iO
top of
Driing
Spool
123_125
Inches
RKiITõ
Top of
Spacer
Spool
.. 140.5
Inches
15õïïiCiieS
from RKB
to GroIn!
Level wtth
Two 5"
MAts
· RKB to
Bottom of
Spacer
. SpooI168
Inches
29.375 93.75 123.125 Rams
17_375 123.1 140.5 Cross
.
~
bottom of 9
518" Csg
· Head
185.5
Inches
27.5 140.5
168 SPACER
RKBto
13-318"
cutoff
191_5
. Inches
17.5 168
185.511"CsgHead
.-
RKB to
bottom of
Celar 222
Inches
6 185.5
191.5 13-3I8"CUloff
...
30.5 191_5
222 Celar Bottom
48
Top of Rotary Table
RKB = 12.1' = 145 INCHES AOOVE Ground Level with 5" of Matting, 150" with 10" Mats
.n.
A
SUB BASE
A
v
À
...
Kin Une Side
CHOKE LINE SIDE
v
A
GROUND LEVEL ELEVATION 15 FEET IMSL
'W
't.f
49
e
SPACE OUT OF BOPE WITH TBG SPOOL IN PLACE
..
..
~
Top of
Hydril 54
Inches
--.-
1140 Inches
RKB to Rig
MAT
"
..
..
..
RKB to
Topol
Rams
93.75
Inches
..
RKB to
Top 01
TBG
Spool
143.5625
Inches
RKB to top
01 Drilling
Spool
123.125
Inches
.-
~
Topol
DSAF
1405
Inches
-.
..
..
RKB to
Top 019·
518" Csg
Spool
165.0625
Inches
"
RKB to
bottom of 9-
518" Csg
Head
182.5625
Inches.
With 4" 01 9·
5/8" Casing
inside head
"
RKB to 13·
3/8" Cutoff
188.5625
" Inches
..
..
..
150 Inches
from RKB
to Ground
level with
TwoS"
MAts
..
RKB to
bottom 01
Cellar 222
inches
"
e
.. Height Top 01 Bottom Of Item
o 0 0 Rotary table
8
8
o
8
8 bushing
16 SPACE
38
16
54 Bell Nipple
39.75
54
93.75 Hydril
29.375 93.75 123.125 Rams
17.375 123.1 140.5 Cross
3.0625 140.5 143.5625 DSAF
21.5 143.6 166.0625 Tbg Spool
17.5 166.1 182.5625 11"Csg Head
-r 6 182.6 188.562513-3/8"Cutoff
.. 33.438 188.6 222 Cellar Bottom
50
Top of Rotary Table
RKB :: 12.1' :: 145 INCHES ABOVE Ground level with 5" of Matting
A
Á
'tf
'"
,.
SID"
'Iff
v
2-1/16" s..I Valve
11" 3M by 9-5/8" 3m SOW
VRPluj:¡
11"3Mwellhead
Height 17.5"
.
136.5" Gap from bottom of I
13-3/8" to bottom of Cellar
.
Hydril Weight 5300 #'s
HeIght 39-314"
Closing Volume 7.43 Gallons
Studs 1-3/8" by 9-112"
16 Studs and Nuts
Ring Gasket R53
Studs Required 16
Stud SiZe 1-318" by 9-1 I'Z'
Ring Groove R-53
LWS Height 29-3/8"
LWS Weight 5080 #3
Closing Volume 1.74 Gallons
Opening Volume 1.45 Gallons
Closing Volume 1.74 Gallons
Opening Volume 1.45 Gallons
Mud Cross Height 17-318"
Ring Grooves R-53
-
~"......~
¡¡;:::::,:..:; .01 '.";
".'. ~ t.' j
,- .~..."
,~-")",,,-
e
f¡iò
,
~h
f,
,,#I
ILîJl~'-·r.~".'1>: r
ty*..~.~~. , .' ;1,.., ,... . j, L
;a ~ · ^::~'Iì
~.-~~ I - -~.
f
ITEM SIZE Ring Gaskets # of Bolts Bolt Size & Length
A. 3-118" 5M HeR Valve on Choke Line R35 8 Per Flange 1-1/8" by 7-1/4"
B. 3-118" 5M Manual Plug valve on Choke Line R35 8 per Flange 1-1/8" by 7-1/4"
C. DSAF 3-118" 3M by 3-118" 5M R31 and R35 8 Studs per side 7/8" by 8" & 1-1/8" by 7-114"
D. DSAF 3-118" 3M by 2-1/16" 5M R31 and R35 8 Studs per side 7/8" by 6" both sides
E. 2-1/18" 5M Manual Plug Valve on Kill line R24 8 per Flange 7/6" by 6"
F. 2-1/18" 5M Manual Plug Valve on Kill line R24 6 per Flange 7/8" by 6"
t $pill PtevetdiGn P.IIn SIT by q by 'Z' J &
~irlt::'- r: --
F-·-iit ---. _1 p¡p¡;NïPP8.
HeiI WiIIt Ftered I ~'~!._.".... OJ
II'I8/aH38 ..... .... :æinche&,,~~?,I1 ., ' ,"!",
..- . . ~ <' \" :¡" v'
ilK>he$ ·1~. ~.~I.' OIIUtiOnparr;;""¡""'''"'!:'f''';P!,\t,\~:,\.,-:.
r =Nipple. '1'
FIll up line, .
I~~:::'..d~.:'. ~I~. in8~·.I. . ..~~..1·~'5a'~DlIFi1!:.Ø~~_I~'
. . "', '. ' \ nuii"~~.IIr~B,~ifAi~;·i~';i;]~;~1"!~t~:~~$.;1~~
12" horn. bOttom 0/ Fillup line to.top 01' Flanj¡e . 12" O,? ., .
. .. . WID· .
-+ '. R~ Rin/l'ö_ -;::J .
$þUI!Iii!_-P~:tiY%7<
1~{;1'.1!1¡·~~;~'k'~f'~""····1.······ ....... ...
'.',..... "..', ..'.' , ."."'. .,..... ,., ,..,. .'.'.,.,'.
.;~;~~·t ,;~.::: ·:1: :..::.': ;:.:.:.::'~~\~~:::.::' 'j,.,~..: .~. :.» <" .
P··
..........................:...
... .::.;>.:..:..
.,.... '
52
ITEM DESCRIPTION
53
r.1
e
~h
"....ç:
<- ~. - ;"
,'.,,1'
'')Þ'.,
-r'~-'. : :-f
ß ¿' .
Iß;~~.,
..'...,.~'..."'''''''"'....
r".'.'."'"
, .....:r~---
" - '."
, -.-....;
,.;..:.'.......'.. .
..-->:,-'
fl ",'
".,.
..
[J
54
r.1
e
e e
ACCUMULATOR VOLUME REQUIREMENTS AND BELL NIPPLE DESIGN
BELL NIPPLE DRAWING FOR USE ON ALL THREE NIPPLE UPS
ACCUMULATOR VOLUMES REQUIRED, TEST PROCEDURE AND BELL NIPPLE DESIGN
ITEM
Annular
Ram
Ram
HeR
Vol to Open Vol to Close Total
o 7.43 7.43
1.45 1.74 3.19
1.45 1.74 3.19
0.5 0.5 1
14.81
150%
11.145
4.785
4.785
1.5
22.215
Acceptable volume of usable accumulator fluid is equal to 22.2 Gallons.
The Accumulator should still have an acceptable pressure of 1500 psi remaining.
Accumulator test procedure.
Fully charge bottles to 3000 psi and shut off pumps.
Shut off air supply and electrics to the accumulator
Close annular and open same. Close Annular again.
Close and open each ram and close each ram again.
Open and close HeR and reopen again.
Measure accumulator pressure and confirm same is more than 1500 psi.
If accumulator pressure is less than 1500 psi, Isolate and check each bottle for correct Precharge.
Each bottle should be precharged to 1000 psi with nitrogen prior to filling with hydraulic oil.
BELL NIPPLE DRAWING FOR USE ON ALL THREE NIPPLE UPS
___L
='38 ;,¡.;.. ".' ..... . r=~ frani '. of11OMine to top of j
1--- :¿,j.~ M'·'-"':'{I'I;~.: -u.·...l'lþilln. .
...-- ,. -- . ¡ ---- .
I .~~ it·'-
:ø....
.... ..... .-.....~.
1'1'· NI~. w/th'1ô(J2 CotJpIJI'!O.. ·1 """'I.- ':ÇF~' :.' ··"10" ô9' If 0'" une Pipe QutIet.QIA fOr .ftÐ'Mirielfbary:~ . .. . "
_.$Q:~t~~ '.. ,~. .'.>.:,.~,'.:.. . ... . '. ,. :....'.,.,.. ;'::. '" ..' '1' ..
. - ... .'''. ,.. n: , .~~..:( ~"~À''''· ' Gt,eerJtIÇe. ~itted ..8'Mf.(ìØOß!!!ÇtiØl't-for. Ô" FIøwI!œ
2' fTò!n bQttøni· ofFill\¡Ip lnàtØtq).of.Flqe ., .,. J~.qo..i ~ -"'"-.'".,~ '.'''; ..."" .".' .... ..':::: .~.~ ,,;. '". ':,:;f~l#g;*
~_.:..- ., -"-. ··1 ... ,. .,.. ..1.1.~JI"'. .'.. ... *1~'¡'.f>Jlh' . ""~.9,.""""¡dií~:"\"'!l!íd:'J"'\'i"""."¡¡":,,,,,,,J
. I...·;r·\_..~:ì".-....<'.:.... :....1+ ~~~iii~~
~Rfng Øe~ ~ ~~'~!!f;j;,~!'ii1'fj,_mj¡~¥~Ji.,?\..""",,,@íl
Spill Prevé~'¡tí.îíl30" by
42" bï '
s "UP ef¡t.. .~. .Tf~ b '42" b2'
pl. .QI\I; ~~I~t:',,,,rl~· Y I'
"'¡';';¡;'\4~~~'''' . .~ '.. .y
~1'~4:~:. " ,. ,¡
....,": .,'".' 'i
J-
ILIAMNA DRll-LING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 55
10/10/03
fJ)
..J
W
W
c
.....
.....
I!(
~ 5
Z
~
W
..J
f2 4
~
o
S2
AD KICK TOLERANCE CHAR
8.0
10
9.0
10.0
MUD WEIGHT
9
IUAMNA # 1
SWAB KICK
TOLERANCE VERSUS MUD WEIGHT
VARIOUS FG"S WITH CASING SHOES
AT 550
8
7
6
3
2
1
o
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, mc. Page 56
11.0
.60 FG "" 11.5
.65 FG "" 12.5
-+- .70 FG "" 13.5
FG .728
.75 FG "" 14.4
.8 FG = 15.4
10/10/03
P SSURE KICK TOLERANCE C
o
500
1000
1500 2000
PSI
2500
3000
3500
4000
°1
bSVMÆê&WX11.5# MUD HYDROSTATIC
9-5/8" @ 5
1000
2000
- -10.5# MUD HYDROSTATIC
- ~OIIMUD HYDROSTATIC
~ASINGSETI1NG
3000
illC'.ffiSW'MAXlM1JM KWM KICK TOLERANCE IN PPG WITH
11.5# MUD
~IMUM KWM KICK TOLERANCEINPPG WITH
11# MUD
~AXIMUM KWM KICK TOLERANCE IN PPG WITH
10.5# MUD
qx¡¡¡¡4f1\'tIWlÆ'MAXIMUM KWM KICK TOLERANCE INPPG WITH
1011 MUD
4000
5000
1
6000
10.0
10.5
11.0
11.5
12.0
12.5
13.0
13.5
14.0
Maximum KWM in
ll.JAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 57
10110/03
IUAMNA #- 1
PROPOSED WEll BORE SCHEMATIC
TOP OF CEMENT ASSUMED@ 16 FEET RKB
TD 5500 FEET
Hole Size 14-3/4" from 14' to 80'
13-318".54.5#. K-55. Butt Casing at 80' RKB
13-318"ID 12.51" from 12- to 50'
Hole Size 12-1/4" from 80' to 550'.
Hole Vo1ume 76 BBlS
30 BBlS
Cement Required 46 BBlS 255.6 Cubic Feet
9-518". 32.3#, K-55. STC at 550' RKB
9-518"ID 8.921" from 12' to 550'
"X" Nipple @ 4900'
5-112" by 2-718" PACKER @ 5000'
2-7/8", 6.5#. K-55. EUE 8 Rd Tublng@ 5200'
Hole SIze 7.875" From 550' to 5500'
Hole Volume 339 BBlS
Annular Vol 178 BBlS
Cement Required 222 BBlS 1245 Cubic Feet
5-112".15#, K-55. l TC MAV@ 5500' RKB
HOLE SIZE AND CASING AND TUBING ANNULUS CALCULATIONS
Total Hole
Cased Feet of Feet of Volume Csg
Casing Casing Hate Casing Depth of Open Hole Csgln Csgln Cased & DlsplFt Csg
Size In Welghl Size In lOin Shoe In Hole Vol Volume Open Cased Open Hole 10 In Olspl
Inches InPPF Inches Inch.. Foet In BblsIfIln_ Hole Hole Bbls bbIsIfI !ibis
Ann Vol
In Bbl.
fromTO
to CeUar
Casing
Cem"'" Capacjty
Vol Reqd from RKB In
Exc... % bbls Bbls
13.375 54.5 14.75 12.615 80 0.211 0.000 54 13.525 0.174 11.1216 2.404 50 3.606 12.367
NOTE Calculations based on top of cement at bottom of callar.
9.625 32.3 12.25 9.001 550 0.146 0.155 470 54 78.406 0.090 48.0552 30.351 50 45.526 43.285
NOTE: Calculations based on top of cement at 16 feet RKB.
5.5
15 7.875 4.44
5500 0.060
0.079
4950
534
340.224 0.029 151.147 179.078
NOTE: Celculatlons besed on top of cement at16 feet RKB
TUBING CALCULATIONS FOR ANNULUS VOLUMES AND CAPACITIES
Casing Ann 1/01 Annular
Depth of 1/01 Sot_o Foot of Foot of I/olume to
End of balow Tbg and Tubing Tubing End of
Tubing Tbg In Casing In Below Abovo Tubing In
In Feet SPF BPF Pack... Packor !ibIs
Tubing Tubing Hole Tubing
Size In Wolght Size In 10 In
Inchos In PPF Inches Inches
Tubing
TBG Olspl to Tubing
DlSpII't Pack... Capacity
In BPF In !ibis In BPF
2.675
6.5 N/A
5200 0.019
2.441
0.011
200 5000
57.827 0.006 40.1461
Page 58
25 223.847
105.324
Tubing Tubing
Capacity Capacjty
to Packer to EOT
FUll
Circulation
Volume 10
EOT In Bbls
0.006 28.940 30.098
87.925
e e
PROPOSED DAYS VERSUS DEPTH CURVE
PEUCAN HILL OIL AND GAS, INC.
lIIamna # 1 Anticipated Days Versus Depth
-10 -5 0 5 10 15 20
o . Davs, ""1"" ,,',
...+_-!-_+.+n_.+-+_+.+-._ "'+-+--+-"1'--- -'+--113-318" @80Ftj·---i·--+-··im-..-+-+-+.+---
::: :~:::: ¡::::r-: ::;:::: . :::~::: :¡::::r-:: :;:::: ::::~:::: ¡ ::::r-::: i:::::::: i:::: ¡:: ::;:::;: :::!:::~:: ::¡::::r- :::;: ::: ::::~::::¡ ::::r- :::i::::
IIIjEIEj:tHIj::T¡tj'~~IEH~IrFj::
1000
I . " "" I " 'I "I I , I ,
I , I I "" '" I I" I I I 1 ""
_ ___-'____J.___......___..____ ___......___1.___.1.___.1____ ___."".___1.____1.___.1____ ____-'____1.____.____. ____-'____1.___.1.__.-'____ _~__..J____..________,J____
, , " I I I' " r' I" '" , ,
I , , I I I' "" 1 " 'I " " I I
____-'___..L____,____.I____ ___...J____.L____,____J____ ___...)____.1-.___,.___.1.___ ____-'____.1.____,____.1 ____J.___,I.____,____.I____ _.__J___..I.____,____-'____
, , " 1 "" '" I " t, ,,' I
, , " "" " " I I ", I '" I
___ .J__ _ _.L __ _ .1. _ _ ..1. ___ _ _ __...._ _ _ _ J..._ .'___ _.I ___ _ _ __ _-'_ _ _ _.1._ _ _ _'-~ __.I _ __ _ _ _ _~J___ _.I. _ _ _ _'~ _ _ _.I _ _ ~_..J_ _ _ _.I. ____'- __ ~.J _ ___ . _ _ _ -'_ _ _ _.I. _ _ ~ ~,_ _ _ _.1_ ___
1 1 1 1 .,. 1 "" "" ,,\, " 1 ,
, , " "" "" "" ,,', ""
- -- -:- ~- - t- - - -:- - - -: - --- --- -;- - --t - - - -¡- - - -: - - - - . - - - -¡- - --t -- - -¡- ~ - -: - - - - - - - ~:~ - --t - - --:~ -- -: . - - -:- -- -t- - - -¡- - - -1- -- - .- - -:- - - -t -- - -¡- - - - 1- - --
- -- -;- - - -: -- --¡- - - -: - - - - .- - - -':- - - -t- - - -:- - - -:-- -- . - - - -¡--- - t-- - -;- -- _.1:__ -- -- - - 1- -- -: - -- -¡~-- -: - - ~ ~ - -¡-- - -: - - - -1- - - -: - - - - - - - -:~ ~- -: - - ~ -;- - - -:- - --
- -- -:- - - - t - - - -i~ - --: - - -- . - - ~:~- - - t- - - -¡-- ~ -t- -- - . - - --¡- - - - t - - - -¡- ~ - -1- -- - - - - -:- - - - t - - - -¡- - ~-: - - - - --i- - - -t -- - -¡--- - t-- -- . v_ - -:- - - - t - - - -¡- - - -:- - --
-- - - -¡ - - -- t -- - -¡- - - -: - _h . - ~ - _:__u t-- - -¡- - ~ - t- - - - - - - - -¡~- - -t -- --¡- - - -: - - - - - - - -:- - -- t- - --;--- ~: - -. ~~ -. -¡:,~: ~: :,1" ~ ~~ ::1,'_-: ~1:, ~ ~~ ~ -. ._~ -::::.~~:~ 1:, ~ ~_~ ~'::,_- ~~ ~ 1:,~ ~~:
nn\----t-u-¡----1---- -uh¡----t----¡--~-1nu -----:,----t----¡--u1nn ----1n~-tn--~-n-1-- -- ---------- - ------- u________ - --------
- - - - ,- -- - ,-- - -,- - - -, - - - - - - - - -,- - - - T - - - -,- - - -,- - - - . - - - -,- - - - T - - - -.-~ - -,- -- - -- - -;-- - - T - -- -,. - - -,- - . -. --,- - - - T-- -~,- - ~ -,-- - - - - - - -,- - - - l' - - - -,- - - -,- ---
j ! ¡! :! ¡! !!:! !!! ¡ n....!nn:n..!:___.!.:m. ....0,'.m1, m.::n__J,nn
----r-u~nuc--~:---~ -n--¡----~----r---r--- .n-Tn-~---T-u~nh n-~:nu:unrn-:n- : : ,: ::,:
- - - -,- - -- T - - - -,- -- -,- - - - -- --,- - - - T- -- -,- - - -,- - - - - - - -.,- - - - T - - - -,- - - - ,--- - - - - ~ ~,- - - -T - - --,- -- -1-- - -- - - -,---- T - - - -,- - - -, -- -- -- - - -,- -- - T - - --,- - - -, - - ~-
.... 1 , , 1 ", 1 . 1 1 " '" 1 . 1 'I 1 1 , 1
z- - - - ~- - - ~ f - - - -¡- - - - i - - - - - - - - ~- - - - ~ - - ~ ~:- - -- i - - - - - - - - ~- - -,- f - - - -:-- - - ~ - - - - - - - - ~- - - - f - - - -¡- - - - i - - - .- - - ~- - - - f- - --;- - - - i - - -- - - - - ~- - - -f - - - -¡- - -- ~ - ---
u.____ ~_ ___ ~_ __ _:-- _~ ~ _ ___ ____ -:____~- ~__;-- _ _~- _ __ _ _ __ ~----~-- __:_ ~_ _~---- ___ _ ~-~_-~-- __:----~--. __~ _--:_ __ _ ~- _ __:_ ___~ ____ __ __ -:__ __ ~ __ __:- _ _ _ ~____
i.n::iL.·+l··.~·...~...Tn,nI:n...tn!Ti .·..;nII) ..tt!
. . - T ~ . - - - - ~ - -
, , ,
- - - - --<_ - - _.. - - - _t_ _ ~ _ -< _ _ _ _ _ _ _ _ ~
_ ~ ~ ~_ _ _ _ _ _ u _ _~
2000
3000
5000
. , " ¡, ¡ t ,
_ _ "_ _ _ --<_ _ _ _+ __ _ _..... ~ _ _.._ __ _ _ __ ...__ _ _.._ _ _ _..... _ __ ~ _ _ _ _ _ _ -~... - _ _. ~ _ _ -- - _ --1-
r 1 1 1 1
, , 1 t 1 1
_.. - - - - - - - ~ -'_ - __. - - - -1- _ _ _.. _ _ _ _ _ _ _...¡_ _ ~ _.. _ _ _ --<_ _ _ _.. _ _ _ _,_ - _ _.. _ _ _ _ _ _ - - --<_ _ _ _ .. _ _ _ -,- _ _.._ _ __
, 1 " I' t " 1 ,
, ' , ' 1 L " ", ,"
_.... _ _ _ _.. _ _ _ _,_ _ _ _.. _ ~ _ _ _ _,~ _ _ _.. _ _ _ _ _ _ _ _..._ _ ~ -.. _ _ _ _l- _ _ -.. _ _ _ _ _ _ -.. _ _ _ -.. ~ _ _ -,_ _ _ ~.. _ _ _ _ _ _ _ ...¡- _ _ -.. _ _ _ -,- - _ -.. _ _ _ _ _ _ _ ~....- _ _ -. _ _ _ -,- - - -.. - - - ~
1 I , , ",." F " " " ", 1
1 , L , I' '" 1 I", " 1 t '" 1
_ ...._. _ _. _ __ _I- __ ~ ,,___~ __~ _....1__ _ _...__ _I_~ __" _ _ _ _ __ _ _-'__~_._~ __._ __ _..._ ___ __ --....1--- _ ...____1_ _~ _,,_ ___ _ ___ _ _ _ _... __ __1_ ___.1_ _ __ __ _ ~....I___ _...____'- ___..._ ___
" ". 1 1 , " '" t "," I ,
1 , t ,I r' ,¡" ,t r I) 1 " t
'~___I__ _ ~.. _ ~ __ ___ _....I. _ _ _.. _ _ _L. _ ~~ ..~___ _ __ _-'__ _ _.. ___ _1_ _ __.1__ _ _ _ +_ + -'_ __ _.. _ _ _ _1_ _ _ _... __ __ __ __ .___...__ __,_ _ _ _,,_ ___ __ __ ....1____. ~ _~ ~I_ _ __..._ ___
" 1 " 1 L " 1 1 ," 1 1 1 ,
, , , I' 1 1 I, 1 t '" 1 " 1 I, 1 ,
- ~-~ ;----f- - --;-- - -;- - - -- --:~ -- -f -- --;----;-- -- - - - - -;- ---; --- -;----; -- -- ----;- -- -f- - - -:- ---:---- ----:--~ f- - --¡- - --1--- - -- --:~ - - - f - - --;- - -- :----
+ --- ~_.- - ~ ----:- ---~---- -----:.-- -~----:-_.- ~- -- - -- - -~----¡----:-- --~- -- - -- ---:--- - ¡ -- --:~---~ - --- - ----:- -- ¡ --- -:- --~~~ --- -- ---:----~----:- -- - ~- ---
1 , I' . 1 " " " 1 t t' 'I" " 1
_ ___~--- _ ~__ _ _:-~__ ~ _~__ ____~--u~- ___;__ ._~- ___ ____ ~----~-- __:----~-- _ _ .___-:_ __ _~__ __:~U ~ ~_ ___ _ u_-:_ ._~u- _;__ __~---- ____~---- ~~ _ __:--- _ ~____
1 , I! ,. 1 1 1 1 I' " 1 1 "" ""
-----:---- ~-- --;-- ~ -~- --- -- - - -:- - -- ~-- - -:----~ ---- -~--~:-- - -~ --- -;-- --1---- ,--- ~- ---~- ---;- ~--~---- -----:-- -~----;----~---~ -- ---:- - - -~- - --:- --- ~- ---
: : ;: :::: :::' :::; :::: ::;:
, 1 " I'" '" 1 "" I, I' 1 1 1 1
. 1 I 1 I' 1 1 "" " " " " 1 1 , I
_ -- _ -{- _ - - ~ - - - -:-- _ _ 'I - - - - - - - - -:- - - - ~ - - --:- - -- ~- - - - - - - -..¡- - - - ~ - - - -;- - - -.¡ - - - - . - - - -:- - --f -- - -:- - - - ~ - - - - - - - - -:-- - 1_ - - -;- --- ~ - - - - .- -- -:- - - - ~ - -- -;- - - -.¡- ---
1 , , 1 , 1 " , 1 1 1 1 " , I 1 ""
"- -- ~- -- ~ t - - --:- - - - ~ ~ - - - . - - --:- - -- t - - - ~:- - -- -1 - - -- - - - - -:- -- - t - -- -:- - -- ~ - - -- - - - - ~- ~ ~ - + -- --;- - - -.¡ - - - - . - - --:- - - ~ - ~ --:- - - - ~ - - - - - ~ - ~ -;-. - - t - - - -:- - - --1- - -.
1 1 I' ", 1 I' I' '" 1 1 " ""
- - - - ~- - - - + - - - -;- - - - ~ ---- -- - - -:- - - - + - - ~ -:- - - - -1 - - - - - - -- -:-- - -t -- - -:-- ---1 - - - - - -- - ~- - - - t - - - -:~ - - -.¡ -. - - . - -- -:- -- -t - - -:-- - - -1- -- - -- -- -:- - -- + - - - -:- - - --I ~ -.-
, , " ", 1 "" " 1 1 " I' 'I' 1
_ _ _ _ _:_ _ _ _ + _ _ _ -:_ _ _ _ ~ _ -- _ -- _ _ ~- - - - + - _ _ -:- _ _ - ~- -- - -- _ - -;-- - - + - - - -:~ - ~ - -I - - - - - --- ~- - - - + - - - -;- - - -1 ~ - w - . - -- -;---- + - . - -:- --- ~ - - - - -- -- -:- - - - + - - - -:- - -- ~ - ---
. 1 " 1 1 " ." 1 I", '" 1 ""
- - - - i- - - -f - - - -:- ~ - - ì - - - - - - - - -;- - - - f - - - -;- ---1- - - - - - - - -:- - - - r - -- w:- - - - ~ - - - - . - - - i- - - - + - - - -:- - - -7-- - - . - - - -:-- - - f - . -:- - - - ì - - - - . - ~ - -:- - - - + -- - -:- --- ~- - --
1 , " ". 1 " " . 1 " "" . 1 1 1
- - - - ~- - - - f- - - -:- - - -.¡ ---- . - -- -:- -- - f- -- -;- - - - ~ - - - - -- - --:-- -- + - - - -:-- ~ - {- - - - . - ---:- - -.- + - - - -;- -- - ì -- ~ - . - -- -:-- - -+ -- -;- - - - +- -- - .- -- -{- - - -+ - - - -:-- -- {- - --
, 1 " "" ,,, 1 " I' I'" ""
- - -- i- - - - + - - - -:- -- ~ {- - - - - - - - i- - - - ~ - - - -:- - - - {- - -- - - -- i- - ~ -} - - ~ -;- - - - ~ --- - . - - - i- ~ --~ - - - -;- - - - {- - - - - - - - i-- - - r - -- '- -- - {- - -. .- - --:- - - - r ~ -- ~:- -- - i- - - ~
1 , " "" "I' 1'., " 1 ""
- - -- i- -- - r - ~ - -;- -- -.;- - - - - - - - -;- - - ~ r - - - -;- --- i - - - - - - - - -:- ---} -- - -:- - - - i - - - - - - - -.,- - - -} - - - -;- -- - i - - - - - - -- -:- - - -} --- - - - - - {-- - - -- - -..;- - --} - - - -:- - - -; ----
1 , I' ," 1 1 1 " '" 1 " , 1 1 , 1
- - - ~- - - - r - - - ~:- - - - ~ -- - - - - - - -:- - - -} - - - -;- - - - ~ - - - - - -- ~--- - r - - - -;- - - - ~ - - - - . - - - ~- - - - ~ - - - -:- - - - ~ - - ~ - - - - - ~-- - - r - - - -:--- - -{ - - - - - --..;- - ~ - ~ - - - ~:- - -- ~ - - --
, 1 . 1 I 1 I' '1. 1 I'" '" 1 ""
: ; :: :::: :::; ;::: :::: ::::
1 , " "" ,I " '" 1 'I I' ", 1
, , " ,', 1 1 I " 1 1 1 1 "" ""
_ _ ~_..,_ __ _ T _ _ _ _,_ _ _ _.. - - _ w . _ _ _..,_ _ W _ T _ _ _ _,--_ _ _, _ _ _ _ . _ _ _,_ - - - T - - _ _,_ _ --.. - - - - - -- -.,- - - - T - ~ - -,- - - -.. - - - - - - - -.,- - - ~ T -- - -,- - --'.. - - -- --..,- - - - T- - - ~r - ~ - -, - - w_
1 . I' I' 1 1 I' I 1 " I' 1 1 ,. ""
- - - - ~- - - - ~ - -- -:- - ~ - ~ - - - - . - - - ~-- - - ~ - - - -:- - -- ~ - - - - . -- - ~-- - - ~ - - - -:.. - - - ~ -- - - - - - - ~- - - - ~ - - - -:- -- - ~- - - - . - - ~ ~- - - - ~ - - --:-- - ~ - - - - - ~ - - ~- - -- ~ - - - ~;- - -- ~- ---
::::~._u ¡·-·+···i···· -···+-··¡·"+--·i·--· -... +"'i""1::::~:::: .:::~::::;::::~:::~:::: ::::~::::;::::1::::;\ ::::~::::;::::~:::~::::
uul -ANTICIPATED DAYS VERSUS DEPTH l~__+m__+u:m+__+m _w~___+.+.+n : : : :
, 1 " " " "" "" I, " I 1 1 1
::::1::::1::T::C: ::::r::1:::r::c: ::::r::1:::r::r:: ::::r::¡:::r::c: ::::J::::1:::r::l5-112" @5500FtU::::
: ~::;::::¡::: :¡:::: j:::: :::: ;:::: ¡::: :\:::: 1:::: ::::;:: ::¡::::~::: j:::: ::: :i:::: ¡::::~::: j:::: .:: :;:::: ¡::: :;:::: j~:: l:: ;::::;::: :~:::j::::
. , " ,
- - _ -_ -.,_ - - - T- - - _,_ - ~ - T_ - - - - - - -...- ~
, , " 1
-.----,----..-
------....----.-
4000
6000
ILIAMNA DRILLING PROCEDURE REV 100CT.doc
Pelican Hill Oil and Gas, Inc. Page 59
10/10/03
POSED COMPLETION SCHEMA
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Pelican Hill Oil and Gas, Inc. Page 60
10/10/03
· e
PROPOSED XMAS TREE AND WELLHEAD EQUIPMENT SPECIFICS
,Y'
~
.",
C!I
...'
.."...
·~as
CI
1I-11t'
"'I
14..
-
16
....
AS
17J111'
r-
....
"
~. "J
iI!-711r all Till
-~~.IJI~
~HIr ØD CS&
II.!. - ME IfIIIIIIIL.
..I, ....
.......
-
,.YIIID ....,
...._ It ...
.. AlW.r
s.: a: F'Œ ENGlNŒRINQ
ACAD
9-518 X 5-112 X 2-718 aD" 5M NIP AllY
D~-- - ... - .¡ 1>11 . ' 4",'''~ .... ,'1.,"'''1',,11: .'.. "."'1' ,.r.. .. II NO.
"':; - - m'~,:·:'"~-' . .. '....,: -,''1.< .... .. SP-1I!IØ-1
ILIAMNA DRILLING PROCEDURE REV lOOCT.doc
Dt31'¡,...Qn u.¡n ()'¡1 q-nA ~t1IC' Tnro
D....fTO t:..1
1 (\/1 0/0'1
I :J
6,000 8,000
---------------
N
\
(t)
Iliamna 2
Exploration Well
Proposed
e
r COOK INLET PELICAN HILL 1074 II
~ PH. 907-333-8880 i
: 2420 FOXHALL DRIVE I:
.~ ANCHORAGE, AK 99504-3342 69-6/1252 ii,
DATE I ¡; -/ () - 0 3 ¡I:
~ DO R
ò~J~~OF_ Stf) ft I";) 1) R.. -" ~f)~c. C. I $ I 0 ~ Î
tJ ttJ f!Ç H-V)/P12&"D j, $ DOLLARS tð ~
¡ (!Yïrsl ~a~i:"i ~~~ I
, ~~..
l~~-:~_.~~~;t;,,~~;~rf~~_I~._~~=~~=--==--~~~.==.~~j
e
Rev: 07/10/02
C\jody\templates
.
e
TRANSMITAL LETTER CHECKLIST
CIRCLE APPROPRIATE LETTERIP ARA GRAPH S TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
"CLUE"
The permit is for a new wellbore segment of
existing weB-,
Permit No, API No.
Production should continue to be reported as
a function· of the original API number stated
above.
BOLE In accordance with 20 AAC 25.005(1), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API Dumber (50
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Companv Name) assumes the liability of any
protest to the spacing . exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
WELL PERMIT CHECKLIST Field & Pool Well Name: ILlAMNA 2 Program EXP
PTD#: 2031730 Company PELICAN HILL OIL AND GAS INC. Initial ClasslType EXP I PEND GeoArea 820 Unit On/Off Shore On
Administration 1 Pe(l'1)itfee attached_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ . . Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ . .
2 Lease_nIJmber _appropriale_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ Yes _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _
3 _UniqIJe welLnamea!1d oumb_e( _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _
4 Wen .located in_a_ d_efioed poo1_ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ No _ _ _ _ . _ _ _ Explo(aJory well. . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ . . _ _ _ _
5 WeJlJocated pr.oper _dista!1ce_ f(Om drilling uoitbolJod.a(y_ _ _ _ . _ _ _ _ . _ . _ _ _ _ _ _ _ Yes _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6 WeJlJocated pr.oper _dista!1ce_ f(Om othenvells_ _ _ _ _ _ _ . . . _ _ _ _ _ _ Yes. _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
7Sjjtficient .acreaQ.e.aYail.able in_drilJiOQ.unlt. _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ . _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _
8 .If deviated. Is_ weJlbore platiocluded . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ . Vertjcal we.lI_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ . _ _ _ _ _ _ _ _ _ . _ . _ . _ _ _ _ . _ _ _ _ _ _ _ _ _
90per.ator onl}' affected party _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
100peratorbasappropriateJlondinJorœ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Yes _ _ _ _ _ _NOTICE.QF_CHANGEO¡::OWNERSHIPa_ndDESlGNAJlQNOfOPERATORto(ms_ filed10J2212003._S¡::Q __
11 Pe(mitcan be issued wltbout conservation order _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . Yes _ _ _ _ _ _ form_10~02Breœi'£ed _10/23/03; Letter of.Credjtwith add_endum app(oyed_ by.1_0l2M2003, Std_ _ _ _ _ _ _ _ . _ _
12 Pe(mitcao be issuedwltboutad_mini~tr.ati'£e_appr.ovaJ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _
10/27/2003 13 _C_ao permit.be approved before _15-day_ wajt _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ .
14 We.ll .located within area and_strata .authorized by.lojectioo O(de( # (PIJtlO# in_c.omme!1ts) (For_ NA . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
15 All wells withifU l4_mite_are.a_of (eyiew ideotified (Fo( ~ervlce well ooly). _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
16 Pre.-produ~edi!1jeçtor; duration_ofpre-p(oductiooless_than_3months(For_ser:vicewellonly) _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _
17 ACMP_F.indingofCon.si.sle!1cy_h.asbeenjsslJed_forJhisproiect. _ _ _ _ _. _ _ _ _ _ _ _ _ _.. _ Yes_ _ _ _ _ _ _Deemed_COl1sistenlbo_Office_ofPr.oiectManage_menlandPe(mittiOQ.on1.0l3/2_003._ _ _ _ _ _ _ _ _ _. _ __
18 _Coodu~lo( ~t(ingprovided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ _ Yes _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
19 .Suúace_casiogprotect$.all_known_USDWs _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _
20CMTv.oladequ_ateJo Ci(c_ul.ale_on_conductor_& surf.q¡g _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . Yes _ _ . _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _
21 _CMTv.oladequateJo tie-inJong.slri!1g lo_sIJrJ csg_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _
22 _CMTwill coyer_all koown_pro_ductiye horizon_s_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
23 _Casi!1g de.sig!1S ad_eQua.te. fo( C.T~ B_&_pe(l'1)afr.ost _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
24 AdequaletanJ<age_orre_ser:ve pit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ Pit capacities reviewed i!1 JIi.amna #1.(203-17.2) _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
25 Jf.a_re-dr.iII~ has_a_ 1.0,.403 for abandonmenl be~m approved _ _ _ _ _ _. _. _ _ _ _ _ . _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
26 Adequalewellbore.separatlonproposed_ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ Yes _ _ _ _ . _ _ No otherwellb.ore_s_nearb}'. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ .
27 Jf.dlv§u:ter reQ.uired, does ItmeelreguJaJions_ _ _ _ _ _ _ _ _ _ . _ _ _ . . _ _ . _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _
Appr Date 28 DrilJiOg fluid_program schematic_&eqjjipJistadequate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes. _ _ _ _ Maximum aoticipated Bt-fl=' 9.0_EMW._l='lal1ned MW 10_.Q ppgwitb supplJe_sJo weighJ IJp.
TrEM 10/30/2003 29 _BOPEs._d.oJhey meelreguJa.tioo _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. 30 BOPEpre.ss ratiog app(opr.iate;_testlo_(put psig in_comments) _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ Yes _ _ _ _ Calculated_MASP_2024 p~i. Plaon_ed BOP Jest pre~s_u(e_3_000 psj. _ _ _ _ _ _ _ _ _ _ _ _ _ _
31Choke_manjfold compJies_ w/APLRF'-53 (May 84)_ _ _ _ _ . _ _ . _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
32 Work will occur. withoutoperation .sbutdown _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ .
33 .Is prese!1ce of H2S gas_ prob.able _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ . _ _ _ _ . _ _ No _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _
34 Mecha_nicaLc.oodjtiO!1.ot wens within AOR yerified (For service well onJy) _ _ _ . _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
35 Pe(mitcaobeissuedw/ohydr.ogen_s_ulfidemeasjjœs_ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ Yes_. _ _ _ _ _None_enco_u!1teœdln_offsetwells,.Rig~ensor~willbeutllized, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _.
36 .Data_preseotedon_pote.ntialoverpres_sure_zones_ _ _ _ _ _ _ _. _ _ _ _. _ _ _ _ _ _. _. Yes_ _ _ _ _. _Non_e_expe_cled._Op_eratorlsaw.aœ_o.fmlJdpr.ofilesusedto_drilJoffselweJls.Wellsitegeologislwillbe_ __
Appr Date 37Seismicanalysjs_ofsbaJlowgas_z.ooes_ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ Yes_ _ _ _ _ _on_site.when_drilling_b_elow.550'MD_._EJectr0l1icdrillinginformatioos}'stemwillbe.used. _ _ _ _ _ _ _ _ _ _ _ __
SFD 10/23/2003 38 .Seabed _condltioo survey (if off-~h.or.e>- _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ . _ . . _ _ _ _NA . _ _ _ No evjd_e!1ce_of shaJlow gas_h.azards_on.sparse sejsmic. _Rig will hav.e.9a~ detectors. _ _ _ _ . _ _ _ _ _ _ _ _ _ .
39 Conta_cl namelphoneJor.w:eekly progress_reports [explorato(y o!1IYl . . _ _ _ _ _ _ _ _ _ _ _ . . . Yes _ _ _ _ _ _ _ Arlen _Ehm. 333:8.880 _ _ _ _ . . _ _ _ _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _
Engineering Public
Commissioner: Date Commissioner
~~~
Appr
Date
.
Engineering
Geology
Geologic
Commissioner:
PT)
Well bore seg
Annular Disposal
D
D
- - - - - - - -
- - - - - - -
- - - - - --
- - - - - -
.
'I!ó¡..~ .-
Date:
An inclination only survey is required on this vertical well. Mudlog will consist of output data from electronic drilling data
system. Cuttings samples waived due to close proximity (within 1-1/2 miles) to two existing exploratory wells having complete
samples from 30' to >6700' MDITVD. Openhole logs waived: will be drilled with casing; pulsed neutron I GR will be run in
casing.
Date
/0/36/3
~
~~