Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-157
e e
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
cQ 0 ~ - 1 5'J Well History File Identifier
Organizing (done)
D Two-sided 1111'1111111111111I
D Rescan Needed 1111111111111111 III
RES CAN
~olor Items:
D Greyscale Items:
DIGITAL DATA
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
D Diskettes, No.
D Other, Noffype:
D Poor Quality Originals:
D Other:
OVERSIZED (Non-Scannable)
D Logs of various kinds:
NOTES:
Date //6/00
D Other::
BY: ~
151
li1P
1111111111111' "III
mP
13
Project Proofing
BY: ~
Date: I Is-lot:,
I I
151
Scanning Preparation
BY:
Date:
+
= TOTAL PAGES
(Count does not include cover sheet)
151
Production Scanning
Stage 1 Page Count from Scanned File: ~ (Count does ;ndU~sheet)
Page Count Matches Number in scannin~,/.Rreparation: YES
BY: Mar;a Date: II S-¡ 00
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES
11111111111111 "III
f
NO
151 Wi P
NO
BY:
~
Date:
151
11111111111111 II III
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111' "III
BY:
Maria
Date:
151
Comments about this file:
Quality Checked
11111111111I1/1111I
1 0/6/2005 Well History File Cover Page.doc
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _lnserts\Microfilm _Matker.doc
bp
.
.
Terrie Hubble
Direct: (907) 564-4628
hubbletl@bp.com
Technical Assistant
GPB Drilling & Wells
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
December 17, 2003
LA) .V- ~ fs--£L-
Alaska Oil & Gas Conservation Commission
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501
Reference: Permit to Drill, 202-157
To Whom It May Concern:
Please cancel the Permit to Drill for 2-3011, Permit Number 202-157 (50-029-22013-60). It has
been determined that with the collapsed tubing at 13,864 feet a sidetrack would be a better
option for accessing additional reserves. Concurrently a Sundry form is being submitted to
abandon 2-30 and a new Permit to Drill for 2-30A will be submitted soon.
Thank you very much for your assistance in this matter.
Sincerely,
~~~
Terrie Hubble
RECEIVED
DEC 1 8 2003
Alaska Oil & Gas Cons. Commission
Anchorage
ORtGtNAL
·
~1T~1TŒ (ID~ ~~~~æ~
e
AI,ASIiA. OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Ted Stagg
CT. Drilling Engineer
BP Exploration Alaska, Inc.
PO Box 196612
Anchorage AK 99519
Re: Prudhoe Bay Unit Z-30Ll
BP Exploration Alaska, Inc.
Permit No: 202-157
Surface Location: 714' SNL, 1323' EWL, Sec. 19, TUN, RI2E, UM
Bottomhole Location: 4353' NSL, 1658' EWL, Sec. 07, TlIN, RI2E, UM
Dear Mr. Stagg:
Enclosed is the approved application for permit to redrill the above development well.
The permit to redrill does not exempt you from obtaining additional permits or approvals required by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the Commission reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
The permit is for a new wellbore segment of existing well PBU Z-30, Permit No 190-23, API 50-
029-22013. Production should continue to be reported as a function ofthe original API number
stated above.
Blowout prevention equipment (BOPE) must be tested in accordance with 20AAC 25.035. Sufficient
notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe
must be given so that a representative of the Commission may witness the test. Notice may be given by
contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
~ .~~L
Ca~echsli T;ylof·
Chair
BY ORDER OF THE COMMISSION
DATED this..3.W:: day of July, 2002
cc: Department ofFish & Game, Habitat Section w/o encI.
Department of Environmental Conservation w/o encI.
t'
. STATE OF ALASKA .
ALASKA AND GAS CONSERVATION COMM ~ION
PERMIT TO DRILL
20 MC 25.005
"'-'lÆ 7 / 2C¡/DL
--::f¡¡::'-7/~1 µ:ro 2-
1 a. Type of work DDrill 1'1 Redrill 11 b. Type of well D Exploratory D Stratigraphic Test 1'1 Development Oil
D Re-Entry D Deepen D Service o Development Gas o Single Zone D Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. KBE = 88.7' Prudhoe Bay Field I Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 047450
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
714' SNL, 1323' EWL, SEC. 19, T11 N, R12E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number /
4508' NSL, 194' EWL, SEC. 07, T11N, R12E, UM Z-30L 1 Number 2S100302630-277
At total depth 9. Approximate spud date
4353' NSL, 1658' EWL, SEC. 07, T11N, R12E, UM 10/15/02 ./ Amount $200,000.00
12. Distance to nearest property line 113. Distance to nearest well / 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028240, 1658' MD No Close Approach 2560 16136' MD /8915' TVDss
16. To be completed for deviated wells 0 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
/
Kick Off Depth 14435' MD Maximum Hole Angle 89 Maximum surface 2494 psig, At total depth (TVD) 8900' I 3550 psig
18. Casing Program Specifications Setting Depth Quantitv of CemAnt
ize T 10 Bol :om
Hole Casinn Weinht Grade Counlinn Lenoth MD TVD MD TVD (include staoe data) /
3-3/4" 3-3116' x 2-7/8' 6.2# /6.16# L-80 TCIII ST-L 2196' 13940' 8773' 16136' 8915' Uncemented Slotted Liner /
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 14970 feet Plugs (measured)
true vertical 9100 feet
Effective depth: measured 14885 feet Junk (measured)
true vertical 9058 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 110' 30" 110' 110'
Surface 2874' 13-3/8" 4009 cu ft Permafrost 2874' 2674'
Intermediate 14229' 9-5/8" 3209 cu ft Class 'G' 14229' 8701'
Production
Liner 990' 5-1/2" 431 cu ft Class 'G' 13~ª0:,,~ t4!:[lO;, "~6,Q',- 9100'
~L:_,r'J;",; t R.,,~ 1 ~"; /~ '7";': r: .~;
:' ;;.. ¡. 'f
"".
'iil ) r..
Perforation depth: measured 14580' - 14654', 14668' - 14735', 14745' - 14764', 14773' - 14795' 1Jl.,)~: ,
true vertical 8898' - 8939', 8946' - 8982', 8987' - 8997', 9002' - 9013' Alaska Œ! & . ('¡m"
'.,""""-,,
AnchoraQE1
20. Attachments 1'1 Filing Fee D Property Plat II BOP Sketch D Diverter Sketch 1'1 Drilling Program
II Drilling Fluid Program D Time vs Depth Plot D Refraction Analysis D Seabed Report D 20 AAC 25.050 Requirements
Contact Engineer NameINumber. Ted Stagg, 564-4694 Prepared By NameINumber: Terrie Hubble, 564-4628
21. I hereby certify that the fo'~true and correct to the be~t of my kn~~ledge . Date '1 µs- ~".
Signed Ted Stagg .:J¿., Title CT Drilling Engineer
'.. :~},:~~ .: v,' ;{;J: > .' , ,',i~jQø.';ûÞ Onl! ,~'>::. ·'Ni·;'þ,:t:: ,,'.,,::.:..: . :.. .
.... ;;, .;', .:,
Permit Number /5'7 API Number Apprn\lcl n<lte I See cover letter
2ðz...- 50- 029-22013~ 60 /f".oé' . /J I~ ,fõå\ for other renuirements
Conditions of Approval: Samples Required DYes 1'SI No Mud Log Reqúíred DYes i8I No
Hydrogen Sulfide Measures IE Yes DNo Directional Survey Required ~Yes DNo
Required Working Pressure for BOPE D 2K D 3K D4K D5K D 10K D 15K D 3.5K psi for CTU
Other:Të'7í- ßðPC ~ 3~ (;Xi fÇ¿ . by order of rf I:J:J I f1~
Onglnal 51gnoo b)
Aooroved Bv ~;tmmY Oechslj T avlo\ Commissioner the commission Date
Form 10-401 Rev. 12-01-85 Submit In" ri licate
r)
1
-,¡
p
it
e
BP
Z-30L 1 CTD Sidetrack
~m~~~O~~~M: /
A CTD through tubing sidetrack is planned for Z-30. The coil sidetrack, Z-30L 1, will exit the 5 1/2" liner in
the Shublik formation and will target Zone 4.
/
Z-30 was completed in 1990 as a Zone 4 producer. The well is now producing at 300 bopd, 1000 bwpd and
solution GOR but this rate is not optimal for MI sweep from the Z-31 i injector. The ~tional1500 ft of
reservoir exposure planned for Z-30L 1 is needed for additional offtake in this area.
/'
The planned sidetrack completion is a 2 7/8" slotted and solid liner crossed over to 3 3/16" solid liner. The
liner will be un-cemented and production from the parent, Z-30, will be retained. ,/
Two small faults will be crossed. Lost circulation risk is moderate.
Phase 1: Prep work. Planned for between Sept. 15 to Sept. 30, 2002.
1. Dummy all GLM's and perform an MIT-IA.
2. Run caliper over tubing to confirm integrity. /
3. Set a standing valve on an inflatable bridge plug at approx. 14,585' (8812ss) to protect
existing Zone 4 perfs. /'
4. Set a flow through whipstock in the 5 W' liner at approx. 14,435 (8728ss).
Phase 2: Mill window, Drill and Complete sidetrack: Planned for Oct. 15,2002.
Drilling coil will be used to mill the window in the 5 W' liner then drill and complete the directional hole
as per attached plan. Maximum hole angle will be 89 degrees.
Mud Program: '
· Phase 1 &2: Seawater and 8.6 ppg Flo-Pro I
· Phase 3: Mill and drill with Flo-Pro (8.6 - 8.7 ppg)
Disposal:
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program: J
The production liner will be a 3 3/16" TC II x 2 7/8" ST-L solid and pre-drilled liner from TD to approx.
13,940' MD (8773'ss). The X-O between 3 3/16" x 2 7/8" will be at 14,515' MD (8773'ss). This liner will be
un-cemented.
Well Control:
· BOP diagram is attached. /
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan. Max. planned hole angle is 89 deg.
· Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
· An MWD Gamma Ray/Resistivity will be run over all of the open hole section.
e
e
Hazards
· Maximum recorded H2S on Z Pad is 10 ppm. /
· One or two small faults will be crossed. Lost circulation risk is estimated at 30-40 percent.
· The measured depth of 16,136' may require the use of a short section of jointed pipe to extend coil
reach.
Reservoir Pressure
Res. pressure is estimated to be 3550 psi at 8900'ss. Max. surface pressure with gas (0.12 psi/f!) to
surface is 2494 psi. /
TREE = 4-1/16" FMC I
WB..U-EAD= FMC Z-30 SAFETY NOTES
ACTUATOR- BA KER
KB. ELEV - 88.66'
BF. ELEV - 52.01'
KOP= 1300' 2114' H4-1/2" OTIS SSSV NIP, ID - 3.813" I
Max Angle- 60 @ 14825' .
Datum MD = 14727'
DatumTVD= 8800' SS
GAS LIFT fvlð.NDRB..S
I 13-3/8" CSG, 68#, L-80, ID = 12.415" I ~ ~ ST MD TVD DEV TYÆ VLV LA TCH SIZE DATE
2875' 6 3398 2891 55 MERLA. 1-1/2' RK
5 8298 5506 56 MERLA. 1-1/2' RK
L 4 10881 6882 58 MERLA. 1-1/2' RK
Minimum ID = 3.725" @13961' 3 12290 7614 56 MERLA. 1-1/2' RK
4-112" PARKER SWN NIPPLE 2 13308 8116 59 MERLA. 1-1/2' RK
1 13889 8422 57 MERLA. 1-1/2' RK
I 13912' H4-1/2" PARKER SWS NIPR..E, ID - 3.813" I
81 2S I 13924' 9-5/8" x 4-1/2" BKR. PKR I
13949' 4-1/2" PARKERSWS NIP, ID =3.813" I
. 13961' H4-1/2" PARKERSWN NIP.ID =3.725" I
4-1/2 "TBG, 12.6#, L-80, 0.0152 bpf, ID 3.958" 13973' I 13973' L 4-1/2' WLEG, ID= 3.958" I
TOP OF 5-1/2" LNR 13980' I 13987' H ELMO TT - LOGGED 08/12/92 I
9-5/8" CSG, 47#, L-80, ID = 8.681" 14229' ~
I 14352' fvIð. RKER JOINT
PffiFORA TION SUMrv1ARY I
RB" LOG: HLS BHCS ON 03/03/90
A NGLEA T TOP ÆRF: 56 @ 14606'
I\bte: Refer to A'oduction DB for hisIDrical perf data
SIZE SA' INTffiV A L Opn/Sqz DATE
3-3/8" 4 14606 - 14622' 0 03/11/90
3-3/8" 4 14634 - 14654' 0 03/11/90
3-3/8" 4 14668 - 14684' 0 03/11/90 ~
3-3/8" 4 14688 - 14735' 0 03/11/90
3-3/8" 4 14745-14764' 0 03/11/90
3-3/8" 4 14773 - 14795' 0 03/11/90
3-3/8" 6 14580 - 14650' 0 04/17/91 -,1)
I UNKNOWN 4-7/8" X 3/4" X 1/8" OM-1 SFRING - 01/01/96 I
I DEPTH
I PBm 14885' I
5-112" LNR. 17#, L-80, 0.0232 bpf, D =4.892" 14967'
DATE REV BY COMMB\JTS DATE REV BY COMMENTS PRUDf-OE BA Y UNIT
03/11/90 OFF ORJGNAL COMR..ETlON WELL: Z-30
02/04/91 RWO RECOrvPLETION PERMrr No: 90-0230
03/08/01 SIS-QAA CONVERTED TO CANVAS AA No: 50-029-2013-00
03/14/01 SIS-MD FINAL Sec. 19, T11N, R12E
05/19/01 RNfTP CORRECTIONS BP Exploration (Alas ka)
. TRa¡: = '
WELLHEAD=
ÄCìì.JÄTÓ~w
KECELB/;'
.··"·"",·,,··,,····c··.,··,,',····,,<·,·,",··,,·,,·,,
BF. 8.EV =
"'''"''''''''-'''''''''''''-'-'''"'''''',-.,""..,.,,,"
KOP=
Max Angle =
Datum MD =
,,,. ". ,_,_ ·_·~w~·_.·_._·,~"~.·.,.·,·_·,,,.'
Datum TVD=
4-1/16" FMC
FMC
'" ,'''',,,'' -""---''';'_'~' ~~~'~-"'","
BAKER
88.66'
'52:01'
1300'
60 @ 14825'
14727'
"-'-"^'...' ·'w·,~>,,·~W"'··'_~
8800' SS
Z-3a Proposed comPletionl
SAFE'r'
-'TES
.
2114'
-i4-1/2" OTIS SSSV NIP. ID = 3.813" I
GAS LIFT MANDRS.5
ST I\,f) TVD DEV TYPE VLV LATCH SIZE DAlE
6 3398 2891 55 MERLA 1·1/2 RK
5 8298 5506 56 MERLA 1-1/2 RK
4 10881 6882 58 MERLA 1-1/2 RK
3 12290 7614 56 MERLA 1-1/2' RK
2 13308 8116 59 MERLA 1-1/2 RK
1 13889 8422 57 MERLA 1-1/2 RK
13-3/8" CSG, 68#.l-80, ID = 12.415"
Minimum ID = 3.725" @13961'
4-112" PARKER SWN NIPPLE
Top of 3 3/16" Liner approx. 13,940'
4-1/2 "TBG. 12.6#, L-80. 0.0152 bpf, ID = 3.958" 13973'
I TOP OF 5-1/2" LNR I 13980'
9-5/8" CSG, 47#. L-80, ID = 8.681" I
14229'
Top of Whipstock approx. 14,435
Standing Valve on IBP approx.14,585
ÆRFORA TION SUMMARY
REF LOG: HLS BHes ON 03/03/90
ANGLEATTOPÆRF: 56 @ 14606'
Note: Refer to A'oduction DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DAlE
3-3/8" 4 14606 - 14622' 0 03/11/90
3-3/8" 4 14634 - 14654' 0 03/11/90
3-3/8" 4 14668 - 14684' 0 03/11/90
3-3/8" 4 14688 - 14735' 0 03/11/90
3-3/8" 4 14745 - 14764' 0 03/11/90
3-3/8" 4 14773 - 14795' 0 03/11/90
3-3/8" 6 14580 - 14650' 0 04/17/91
14885'
5-1/2" LNR. 17#, L-80, 0_0232 bpf, ID - 4.892"
14967'
DAlE REV BY COMMENTS
03/11/90 DFF ORIGINAL COMA..ETION
02/04/91 RWO RECOMPLETION
03/08/01 SIS-QAA CONVERTED TO CANVAS
03/14/01 SIS-I\,f) FINAL
05/19/01 RNITP CORRECTIONS
4-1/2" PARKER SWS NIPPlE, ID = 3.813"
-i9-5/8" x 4-1/2" BKR, PKR I
-14-1/2" PARKER SWS NIP. ID = 3.813"
4-1/2" PARKER SWN NIP. ID = 3.725"
(¡,)
~
.....
q
13973' ~4-1/2" WLEG. ID = 3.958" ,
1398T H 8.I\,f)TT - LOGGED08/12/92
33/16" X 2 7/8" X-O approx. 14,515
2 7/8" Pre-Drilled Liner
\ /
Planned TD 16.136'
4-7/8" X 3/4" X 1/8" OM-1 SPRING - 01/01/96
DAlE REV BY
COMMENTS
PRUDHOE SA Y UNIT
W8.L: 2-30
PERMIT No: 90-0230
API No: 50-029-2013-00
Sec. 19, T11N,R12E
BP Exploration (Alaska)
Vertical Section
o
8550
8600
8650
8700
8750
Z-8800
Q
Q
u.
'-'
o
i::8850
8900
8,915
8950
9000
9050
9100 rei M5
500
Z-30
Path Distance (Feet)
.+-~---
1,000 1,500
2,000
Z-30Ll
case 1 04
June 5, 2002
Ted x4694
Angle @ K.O.= 56
deg MD:14435
2,500
3,000
3,500
TSAD
+-----------+--------1
Tot Drld:1701 ft
16136 TD
Kick Off
Deprtr @KO
8,8551
8,8.55.lft TVD
8,827
MD KO Pt
MD New Hole
1 4,435
1701
Total MD
WDTD
16,136
8,915
IWell Name Z-30
Z-30
11 ,000 CLOSURE
I Distance 10,352 ft
Az 1 deg
NEW HOLE
10,500 Kick Off
TO
State Plane 599,244
Surface Loc 599,043
1 0,000 e
.9
~
E 9,500
2
.....
~
c:
tv
tî
'is
>-
Z-30L1 9,000 10
Case 1 04 1,701
June 5, 2002
Ted x4694
8,500
-2,000
-1,500 -1,000 -500
X distance from Sfc Loc
o
500
Drawn: 7/16/2002
9:30
Plan Name: Case 122
All Measurements are from top of Riser
bttm of bag
middle of slips
middle of flow cross
middle of blind/shears
middle of pipe/slips
Flow Tee
......................
TOTs
Mud Cross
TOTs
Blind/Shears
s....
Q)
ø
~
BAG
7/16/2002
III 20100 1111 1:0 ~ ~ 20:18 q 51: OOB'" ~ ~ qlll
e
ALASKA OIL & GAB CONSERVATION
COMMISSION
333 W 7'rH AVE
ANCHORAGE, AK.
AMoUNT
II * *:: $ iÓo.66** * *
.;",~,~,~~";.:~-:!.\;;\;</,
.......~... ..........'.....................
,:'.,'. "':"0: .. .:...... ...... ::..' ~... ':".:.
I:.:.:~.: J I!.. ." \~
;:·::.:::':i;.:~·;: :Ü:·;·;·: :;L.;·t~::~¡~i:·:li;·¡;:·}::;;;·:¡:~~:·:~:: ;'i'~:i, ;.~..:~ :::-i:'
STE 100·
995Ql
No. H 207001
FIRST NATIONAL BANK OF ASHLAND
AN AFFlUATE OF
NATIONAL CITY BANK
CLEVELAND. OHIO
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
~NÇHORAG~.~kAS!V\.99519·6612
TO THE
ORDER
OF
·8· . ..p r. ~ ",,,. ....Ul ,'III~. ··..10· ,J"
iii. I... I , 1.... ',,,
.,",.._ . . ::]..41.. 11111' 'II'" 1111'1 "*Iü-.:'.t.
56-389
412
CONSOLIDATED COMMERCIAL ACCOUNT
TOTAL ~
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
H
PERMIT TO DRIL~ FEE
INV# CK071002B
7/12/02
e
Z-6DLI
NET
7/12/02
VENDOR
DISCOUNT
GROSS
DESCRIPTION
INVOICE I CREDIT MEMO
DATE
I CHECK NO.
H207001
H 207001
DATE
·
e
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERfP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME ~Aú 2. -3ô¿ I
PTD# ZCJ 2-- / .5 )
CHECK WHAT ADD-ONS "CLUE"
APPLIES (OPTIONS)
MULTI The permit is for a new well bore segment of
V LATERAL existing well ~ 2' ~ fCJ
Permit No, /9'0 -.2.3 API NO.6'" - ð ~ ,...~ .2..01:3
(If API number Production should continue to be reported as
last two (2) digits a function of the original API number stated
are between 60-69) above.
PILOT HOLE In accordance with 20 AAC 25.005(1), all
(PH) records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50 -
70/80) from records, data and logs acquired
for well (name on permit).
SPACING The permit is approved subject to full
EXCEPTION compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Companv Name) assumes the liability of any
protest to the spacing exception that may
occur.
DRY DITCH All dry ditch sample sets submitted to the
SAMPLE Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
Rev: 07/10/02
C\jody\templates
WELL PERMIT CHECKLIST COMPANY A /J ]./ WELL NAME.Pt'U ~-:1o 1.1 PROGRAM: Exp Dev L Redrll Re-Enter Serv Wellbore seg -X
FIELD & POOL ¡::: 710 / <" /!. INIT CLASS Óv:J,1/ /-d/ï GEOL AREA ~/C> UNIT# // Çó t"'> ON/OFF SHORE ON
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . "( N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . y N
3. Unique well name and number. . . . . . . . . . . . . . . . . y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . y N
5. Well located proper distance from drilling unit boundary. Y N
6. Well located proper distance from other wells.. . . . . . . . y N
APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . y N
4&.- ~~ 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . y N
11. Permit can be issued without conservation order. . . . . . . . y N
12. Permit can be issued without administrative approval.. . . . . ~N
(Service Well Only) 13. Well located w/in area & strata authorized by injection order # - .fi /l./. A .
(Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . . . ., N
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . .V--N-
16. Surface casing protects all known USDWs. . . . . . . Y N'
17. CMT vrn adequate to circulate on conductor & surf csg. -¥-N" f\lI A-
18. CMT vol adequate to tie-in long string to surf csg. . -¥---N- '
19. CMT will cover all known productive horizons. . . . . . Æ1: s/ofted
20. Casing designs adequate for C, T, B & permafrost. . .
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . _ N crDu... '
22. If a re-drill, has a 10-403 for abandonment been approved. . . ¥--N"" Ai/A-
23. Adequate wellbore separation proposed.. . . . . . . . . . . . @N
24. If diverter required, does it meet regulations. . . . . . . . . . ir/k
25. Drilling fluid program schematic & equip list adequate. . . . .
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . .
APPR DATE 27. BOPE press rating appropriate; test to ~ÇOO psig.
ld~ ~ 2- 28. Choke manifold complies w/API RP-53 (May 84) . . . . . . . . @~
29. Work will occur without operation shutdown. . . . . . . . . . .
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . y@
(Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . . . -..y---N- Ai/It.-
GEOLOGY 32. Permit can be issued wlo hydrogen sulfide measures. . . . . YÆD.
APPR DATE 33. Data presen'ed on potential overpressu", zones. . . . . . . . Æ
.//l. ddsz. 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y .1'1/. r:J.
35. Seabed condition survey (if off-shore). . . . . . . . . . . . . . N'
(Exploratory Only) 36. Contact name/phone for weekly progress reports. . . . . . . . Y N
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER COMMISSIONER: Comments/Instructions:
RPC~ TEM JD~ JBR COT o 7/3//0 <..
DTS
SFD_ WGA WtJr- MJW
Rev: 07/12/02
e
e
G:\geology\permits\checklist.doc