Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CO 105 C
) ) Image Project Order File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Co I OSC Order File Identifier Page Count from Scanned Fiíe. ,(41"----- (Count does include '7' sheet) Page Count Matches Number in SCanìing ~reparatìon: V YES ~a'ia) Date: I J 7 / D0 If NO in stage 1, page(s) discrepancies were found: YES Organizing (done) 1111111111111111111 o Two-sided RESCAN DIGITAL DATA o Color Items: o Greyscale Items: o Diskettes, No. D Other, No/Type: o Poor Quality Originals: o Other: NOTES: Date: i 17/ f:k; Date: J "710b X 30 = , Date: /1 7/ob BY: ~ Mar~ - ., ~. Project Proofing BY: ~ Scanning Preparation BY: ( Maria) Production Scanning Stage 1 BY: Stage 1 BY: Maria Date: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: Comments about this file: o Rescan Needed 1111111111111111111 OVERSIZED (Scannable) o Maps: D Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) D Logs of various kinds: o Other:: I~ VW~ 11111111111111111 ~ Isl ¡Nt + = TOTAL PAGES Q CJ (Count does not include cover Shlet) ,AA " Q /s/ VV(; 1111111111111111111 NO I~ VVt P NO /S/ 1111111111111111111 /S/ Quality Checked III11II1I1111111111 10/6/2005 Orders File Cover Page.doc . . Index Conservation Order I05C Middle Ground Shoal I. July 5, 1973 Amoco Production Company request for Emergency Flaring of Excess Gas 2. July 31, 1973 Amoco's request for a hearing 3. August 1, 1973 Amoco Amendment of CO 105 4. August 16, 1973 Notice of Hearing and Affidavit of Publication 5. November 7, 1974 Amoco request for approval 6. November 27, 1974 Amoco request for Admin Approval (AIO 1 05C.l) 7. July 1, 1975 Amoco request for Admin Approval (AIO 105C.2) 8. July 14, 1975 backup information 9. September 16, 1975 Amoco request for Admin Approval (AIO 105C.3) 10. November 17, 1975 Amoco request for Admin Approval (AlO 105CA) II. January 30, 1976 Amoco request for Admin Approval (AIO 105C.5) 12. February 17, 1976 Shell's explanation for lengthy shutdown 13. October 1976 Excessive Gas to Flare 14. January 24, 1977 Amoco Quarterly report of gas flared or vented in excess of volume required for safety 15. January 28, 1977 Amoco request for Admin Approval (AlO 105C.6) 16. May 11, 1977 Amoco request for Admin Approval (AIO 105C.7) 17. May 31, 1977 Shell's report mechanical shut down 18. June 7, 1977 Shell's report mechanical shut down 19. August 2, 1977 Amoco request for Admin Approval (AIO 105C.8) 20. August 1977 Excessive Gas to Flare 2I. September 1977 Excessive Gas to Flare 22. October 11, 1977 Shell Flaring Penalty 23. October 25, 1977 Amoco Quarterly report of gas flared or vented in excess of volume required for safety 24. June 14, 1978 Interoffice memo 25. August 3, 1978 Amoco request seeking intracompany approval for approval for repair of South Middle Ground Shoal Platform Dillon platform 26. November 3, 1978 Amoco request for Admin Approval (AIO 105C.12) 27. March 20, 1986 Amoco letter informing AOGCC that Baker Platform back on line 28. ----------------------- Misc Information Conservation Order 105C I "- \ 1 " t, ' }- I STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL AND GAS Alaska Oil and Gas Conservation Committee 3001 Porcupine Drive Anchorage, Alaska 99501 ) ) ) ) tive approval of gas flaring for a ) maximum of 60 days in cases of opera-) tional necessity. ) Re: THE APPLICATIONS OF SHELL OIL COMPANY AND AMOCO PRODUCTION COMPANY for an order amending Conservation Order No. 105 to permit administra- Conservation Order No. 105-C Middle Ground Shoal Field M GS II A ", II B ", II C ", II D ", II E", "F" and "G" Oil Pools. January 28, 1974 IT APPEARING THAT: 1. The Oil and Gas Conservation Committee published a notice of public hearing in the Anchorage Daily News on August 16, 1973, pursuant to Title 11, Alaska Administrative Code, Section 22.540. 2. A public hearing was held on September 11, 1973, in the City Council Chambers in the Z. J. Loussac Library, 5th Avenue and F Street, Anchorage, Alaska, at which time the applicants and other parties were heard. 3. The hearing record was combined with that for Conservation File No. 102 E, which related to the Middle Kenai Oil Pool of the Granite Point Field, because the same order was requested and Amoco Production Company was an applicant for both orders. 4. The Committee gave the substance of this order verbally to the applicants after the hearing. FINDINGS: 1. Pursuant to Rules 2 and 3 of Conservation Order No. 105, flaring or venting of casinghead gas in excess of the volume required for safety is permitted only in case of emergencies, and must be reported to the Committee within 96 hours after occurrence. 2. The Committee considers emergencies to be situations involving a danger to life or property. 3. During the period of routine repairs of gas handling equipment on the platforms, gas pipeline breaks, "turnarounds" of facilities using the gas, and other required repairs, overhauls and work on equipment downstream from the oil wells, beneficial utilization of some casinghead gas may not be feasible. These repairs and other work arise out of opera- tional necessity. Conserva ti on Order i' )5-C Page 2 January 28, 1974 ') 4. The history of such repairs and other work indicates gas handling equipment can usually be repaired or overhauled within a few days, pipe- line breaks may take several months to repair depending upon the time of year and weather conditions, and overhaul or "turnaround" of the Collier Carbon and Chemical Plant which is the market for the gas will probably take less than two months. 5. Most overhauls of gas handling equipment can be scheduled to coincide with the "turnaround" of the Collier Carbon and Chemical Plant, thereby minimizing the time during which the gas is not beneficially utilized. 6. No reasonable alternative use of the casinghead gas exists during the periods the gas handling equipment, pipeline or Collier Carbon and Chemical Plant is inoperative. 7. Operating experience in the referenced pools indicates that the shutting-in of wells may impair production rates for approximately 90 days after the wells are re-opened to production. CONCLUSIONS: 1. Repairs, overhauls or other work on gas handling equipment, pipelines and the onshore facilities beneficially utilizing the casinghead gas may be required. 2. The time required for these repairs, overhaul and other work may depend on conditions beyond the applicants' control. 3. The referenced pools are producing increasing quantities of water with the oil, and the possibility exists that shutting-in the wells will damage the producing zones. 4. Additional beneficial uses of the casinghead gas do not presently exist. 5. The flaring of casinghead gas, when required because of repairs, overhaul and other work on wells or on equipment and facilities downstream from the wells in the referenced pools, may be an operational necessity. NOW, THEREFORE, IT IS ORDERED: Rule 1. Rule No. of Conservation Order No. 105 is hereby revoked. Rule 2. Rule No.2 of Conservation Order No. 105 is hereby amended to read as follows: Effective 7:00 a.m., October 1,1973, the flaring or venting of gas from the Middle Ground Shoal Field is prohibited except for the amount necessary for adequate safety flares or emergencies or as may be authorized by the Committee in cases of operational necessity exceeding 96 hours. Conservati on OrdeJ. f )-C Page 3 January 28, 1974 ) Rule 3. The commencement, nature and termination of all emergencies requiring flaring of casinghead gas in excess of the amount required for safety flares shall be reported to the Committee within 96 hours after occurrence. Rule 4. Any flaring or venting of gas in excess of 15 days per calendar quarter per platform, other than that required for safety, shall require Committee approval. Flaring or venting of gas in excess of the volume required for safety at a location other than a platform shall be deemed to have taken place at each platform. Rule 5. Commencing with the calendar quarter beginning January 1,1974, the operator of each platform or facility in or serving the referenced pools shall report in writing to the Committee the number of days gas was flared or vented in excess, of the volume required for safety, the reason for the flaring or venting, and shall identify the platform or facility. The report shall be submitted within 30 days following each calendar quarter. DONE at Anchorage, Alaska and dated January 28, 1974. ¡/fR', !!~ha~~¡c'retarY Alaska Oil and Gas Conservation Committee ~, ~-"\,,, ,,- /t~. ,<,.trJi,j.(, M . ,\,~,.'~~'"--~-4.() ~ ~::¡ >ø" -......,... ~~<fJ )!,.~~ ' '\ i¥ I ',j! ((~,yA:;I" ~? \ Jr:([ [~ \ f," o,:>:~ A,.'t,·'I ~(I:' , · ,~~t?'\.'\];<!(?[:,:i':¡t . . ,r" ~:""", II) '.: ,,'- ""f,' \, ¡ """j . .,,\"~,',I,\, ,\ ·~'~;::~::'::'~~::.,i,',~..'; "".. v', .",,:',,';':,', ""',:.',f.,, ','. " ~,:~.,'~,,"~,',,",',','~,','~~., /','".,":~,',"',.~,.,;:'::' '., '~,.;t'~,,-,-,-,'" _:':'.'~- I,l';¡'~,::\ :I":'~ ::"",\,,'/ ·1",/,;":'::\ '(î\, ' -. '.. II ~" '¿",,{',,'J":' \ ...1,. : . ',.'t' \;.:...") <\,)~, ~ \' 1)1 ":'07' v '(~t " . ,.,.¡, i7 "" I, ""~" '.' ,/ ~~; \ I'~~~~'::."":~"'I::':': ":~'., ¡. "'. "~~:// , "'Ji ~:'PI cc;,</ "-)~~..~ C(l0ncu,.r.rence: f :7 Li~~ t:'5~ Homer L. Burrell, Chairman Alaska Oil and Gas Conservation Committee ftJr~ ~. O. K. Gilbreth, Jr., Memb~r Alaska Oil and Gas Cons~ation Committee ~' \-.J. STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL ANn GAS Alaska Oil and Gas Conservation Committee Re: Emergency Order July 5, 1973 Conservation Order File 105 Middle Ground Shoal Oil Field Because of a fire and explosion at the Collier Carbon and Chemical Corporation plant, Amoco Production Company and Shel I Oil Company applied for the referenced order by letter dated July 5, 1973 requesting the emer- gency flaring of excess casinghead gas equal in volume to that which would normally be delivered to the Collier plant. The gas wi I I be flared at the Joint Amoco - Shel I faci lities on the east shore of Cook Inlet. All such excess gas originates from the Middle Ground Oil field. Pursuant to Alaska Administrative Code Section 2012 permission is hereby granted to flare excess casinghead gas in an amount equal to the normal sales volume to the Collier Chemical Company until 7 AM A.D.S.T. July 21, 1973 or unti I normal gas sales are resumed to Coil ier Chemi~al Company if this occurs at an earlier date. Thomas R. Marshall, Jr. Executive Secretary Alaska Oi I and Gas Conservation Committee 3001 Porcupine Drive Anchorage, Alaska 99501 December 31, 1985 ADM I N I S T RAT I V E A P PRO V A L N O. lOSC-IS. o _ Re: The application of M10CO PRODUCTION COMPANY to flare gas in a quantity that exceeds the current permitted volume at Platform Baker" Middle Ground Shoal Field. Hr. W. G. Smith District Manager Amoco Production Company P. O. Box 100779 Anchorage, Alaska 99510-0779 Dear Mr. Smith: We have received your letter of December 27, 1985 requesting the extension of the date of, December 31, 1985 set out in Administra- tive Approval No. 105C-14 for the flaring of excess gas at Baker Platform. This extension is requested to provide additional time to complete repairs of the gas compressor.. The Alaska Oil and Gas Conservation Conunission has reviewed the new data available and restates that flaring of gas at Platform Baker is an operational necessity. By this letter, Amoco Production Company is hereby permitted to flare all gas not beneficially used on Platform Baker from this date until the completion of the remedial work on the gas com- pressor, or until February 15, 1986, whichever occurs first. Yours very truly, ~td. ~{LJ Harry lv. Kugler Commissioner BY ORDER OF THE CO~ll1ISSION be:' 3 . .AAl 05 BY ORDER OF THE CO}fMISSION be:3.AAI05 ~ very truly, ,...-" I .- I "i Y' ' Ii // /'~' " , 't/I/l,tí?/' h7C~. arry/iA]. Kugler ' Commissioner We have received your letter of December 10, 1985 requesting the extension of the date of December 13, 1985 set out in Administra- tive Approval No. l05C-13 for the flaring of excess gas at Baker Platform. This extension is requested to provide additional time to complete repairs of the gas compressor. The Alaska Oil an.d. Gas Conservation Cormnission has reviewed the new data available and restates that flaring of gas at Pla.tform Baker is an operational necessity. By this letter, Amoco Production Company is hereby permitted to flare all gas not beneficially used on Platform Baker from this date until the completion of the remedial work on the gas com- pressor, or until December 31, 1985, whichever occurs first. Dear Mr. Smith: Mr. vI. G. Smlth District Manager Amoco Production Company P. O. Box 100779 Anchorage, Alaska 99510-0779 Re: The application of AHOCO PRODUCTION COMPANY to flare gas in a quantity that exceeds the current permitted volume at Pla,tform Baker, Middle Ground Shoal Field. N O. l05C-14. APPROVAL ADM I N 1ST RAT I V E December 13, 1985 November 29, 1985 A ~ M, I ,~. I S ~ '~ AT ,~ V E APPROVAL N O. l05C-13. 'If "". ... Re: The applica.tion of AMOCO PRODUCTION COMPANY to flare gas in a quantity that exceeds the current perm1.tted volume at Platform Baker, }'1iddle Ground Shoa.l Field. Mr. tAl. G . Smith District Manager Amoco Production Company P. O. Box 100779 Anchorage, Alaska 99510-0779 Dear Mr. Smith: Your applica.tion, dated November 27, 1985, requesting a flare limit exception for Platform Baker for the period of November 4, 1985 to December 13, 1985 has been received by the Conunission. The application indica.tes you shut-down your gas compressor on Platform Baker on November 4, 1985 for compressor modifications. You estimate that from 100 to 300 MCFD of gas in excess of the approved 700 MCFD safety flare volume will be flared until thi.s compressor is back on line. ' The Alaska Oil and Gas Conservation Commission has reviewed the data available and finds that, at this time, the flaring of excess gas on Platform Baker is an operational necessity although its occurrence commenced prior to approval. By this letter, Amoco Production Company :f.s hereby permitted to flare all gas not beneficially used on Platform Baker from November 4, 1985 until completion of the modifications or until December 13, 1985, whichever occurs first. Yours very truly, ~!:l~~ Commissioner BY ORDER OF THE CO}~1ISSION be:3.AAI05 ') I r:\ l¡-l r\ (N r;V7 Lr~~ / /lJ\ I!\': '.~ l\ fJ\ LJ"lJ l.-J LI ~ü í~~) ,J~ t \1 ;1 1)1~1·.:\.t1."'I\IENT CÞI~' N..'~TUltAI~ Itl~SCÞLTIICI~S DIVISION OF OIL AND GAS / 3001 PORCUPINE DRIVE - ANCHORAGE 99501 ~ II,W i,r rÞ, ~ U Ln.~ U L~:J ~ J (::,,,\ r--.:J l! !J I' ~ ~/ U JA Y S. HAMMOND, GOVERNOR AlASKA OIL AND GAS CONSERVATION COMMITrEE November 7, 1978 ADM I N I S T RAT I V E A P PRO V A L N O. 105.C.12 Re: Application of Shell Oil Catlpany, operator of l'-1iddle Ground Shoal Platform 'C', for approval to flare casinghead gas in excess of the amol,ll1t required for safety for more than 15 days per calendar quarter~ Mr. Pete Woodson Division Production Superintendent Shell Oil Canpany 601 "\^Jest 5th Avenue, Suite 810 Anchorage, Alaska 99501 Dear ~..r. vvoodson: The referenced application was received on November 6, 1978 stating that the York Sales Gas Canpressor which failed on October 3, 1978 was found to have excessive wear which required it to be sent back to the factory for repair. The repaired asserrbl y is expected back in Alaska wi thin a few days but laror problems at the factory may delay the repair and the shiprrent.. Pursuant to Rule 4 of Conservation Order No.. 105.C, the Oil and Gas Conservation Camnittee hereby authorizes the :Elaring of excess gas at the referenced platform for 15 days· over and above the 15 days provided for in Conservation Order No. l05..C.. This authorization is valid only in the fourth calender quarter of 1978. The eorrmittee requests that a report be submitted giving the date when the carq;:>ressor is back in operation. Very truly yours, .-/ /. ,.; 1--/ (:) /' "' ;r \,Jc. :..-...--.--,..¡. ("J, ^..:...' ,? l:~'_../ ,--' , / Harry v-l. Kugler " Ex.ecuti ve Secretary Alaska Oil & Gas Conservation Committee The Cor~ittee requests that a weekly report be submitted giving the details of the work accomplished. Very truly yours, / / ,., k-:. /// // / ,,(._-;;. ~.~ . I /.J I·." /. :,. '. I' / L- {,.""', 1 '''-'__c.'' '. '~I l.... .," ___ . I Harry ·W. Kllgler Executive Secretary Alaska Oil and Gas Conservation Committee ~{tf¡'tî{: be Pursuant to Rule 4 of Conservation Order No. lOS.C the Oil and Gas Conservation Committee hereby authorized the flaring of excess gas at the referenced platforms until October 1, 1978 or until the repairs are completed on the pipeline, whichever comes first, pro- viding repair procedures, expected to be finished about September 15, 1978, are pursued diliqently. The referenced application was received on August 28, 1978 stating that. approvals by partners and the necessary equipment has been obtained to repa.ir the pipeline involved in ·carryinq all Middle Ground Shoal casinghead ga.s from the Dillon Platform to sbore. The authorization for flaring of excess gas contained. in Adminis- trati ve Approval No. 105. C. 9 expires t.his date ð.nd additional flaring will be required u.ntil the repairs are made. Dear Mr... ij~ooð.son: M.r. Pete tr\10odson Division production Superint.endent Shell Oil Company 601 t''1est 5th Avenue, Suite 810 Anchoraçe, Alaska 99501 l 1 ADM I N 1ST RAT I V E A P PRO V A L N O. l05.C.l1 .. ·\,If"·V~--: '!f","·'~~"""'''''''''''''''fI~,...'It· .:t:''¡¡,II::\-.:IX,1 '\"¡".~'~",+. n"l'_ _u,~ ,.......'" .1\ "\.oiII._~_,\\.,......\ "~\,,'I'~'~Ia\'."', ;_....¡lJw~\~r...__\ qV\!"C~\M-"" _'\-·"';.v¡¡'I.,".....·...-\¡<...,...'u:_,\IA\V~"";,.,~ Re: Applicatio11of Shell Oil Company ,operat.or of ~~.iddle Ground Shoal Platforrn, nA n an(l tt.en t for approval to flare casin9head gas in excess of the an'\:ottnt required forsafert.y for more than 15 days per calendar qua.rter. August 291' 1978 ALASKA OIT.., AND GAS CONSERVATION COf.4MITTEE Conservs;tion !Rfl< tOO, Very truly yours, /-/0 ../ ¿J.l:4 ~ Harry W. Kugler r Executive Secretary Alaska Oil and Gas Conservation Com:mi ttee The Committee requests that a weekly report be submitted giving the details of the work accomplished. The referenced application was received on August 28, 1978 stating that approvals by partners and t.henecessary equip.IUe'nt has been obtained to repair the pipeline involved in carrying all ~1iddle Ground Shoal casinghead gas from the Dillon Platformt.o shore. The authorization for flaring of ,excess gas contained in Adminis- trative Approval No. l05.C.9 expires "this date and additional flaringt'l7ill be required until the repairs are made. Pursuant to Rule 4 of Conservation Order No. lOS.C the Oil and Gas Conservation Committee hereby authorized the flaring of excess gas at the referenced platforms until October 1, 1978 or until the repairs are completed on the pipeline, whichever comes first, pro- viding repair procedures, expected to be finished about Septe~ber 15, 1978, are pursued diligently. Dear fitr. Darsow : M.r. tile A. Darsow Area Superintendent Amoco ,P'roduction Com.pany P. O. Box 779 -~nchorage, Ala:ska 99510 ADM I N r S T RAT I V E A P PRO V A L N O. lOS.C.l' '( ..'.... r~I\;L._'n¡.,IiA_..':·~\i.I.........II"r:·.."·._.~·", ... .. ,.". "'¡"''\'T'' .\',_\,\\'V'I,'_I""A»'li'.~ '_\._¡¡~",""""'_·"""'h,·'_\oI"'·'I'.'r"\jl",~,,',\ .I~" '......-)""1.. _~". "ÅI'".t"k'\_i4~' _J'~"'''''''\. "·':jl".,h~~..' ~Il'.,.~......,_r·-,..._\...,\..... Re: Application of J\moco Production Company, operat'or of Middle Ground Shoal Platform 'flBaker" anc1 South NtiddleGro'.1nd Shoal Unit Platform '~Dillon't, for app~oval to fl,are easingheadqas in ,sxcesso,f the amount required for safety for more thann 15 days percalenclar quarter. August 29, 1910 ALASKA OIL AND GAS CONSERVATION COI~1ITTEE Con.servation n~q"/SBU:bjtr( 'Ibe refereru::edapplicatian \ElS, reœived en June, 21, 1978 stating that a leak in the gas pipeline has been traced to the pipeline riser at the Dillœ Platform. Asa result of this leak, gas in excess of that. œquired for safety is being flaxed at both of the refeœnoed platfoxms. Pœsent infouration is inadequate 1:0 ðete:r:miœ how much ti!Ie will be requiz:ed to make' the necessary repairs. Pursuant to Rule 4 of C'.OnsfI..rvat.im order No. 105.C the on and Gas Conservaticn Carmittee hereby authorizes flaring of excess gas at. the æfeænœd platforms for the :n:mûnder of the current œ1end.ar quarter and for the first 60 days of t±e third calendar quarter of 1978 or until the œpairs are cx:mpleted œ the pipeline, whicheuer caœs first, providing repair proca::ìuœs are pursued diligently. 'n1e Carmitt.ee requests that a æekly repact 1:e su1:Eitted giving the details of the work accc.rrplished. Very truly yours, ~I 7fI ....../~l I~- --" ,v- - " ' " "", . . ?5rÓt?7tY' ;Øt-- Hoyle H. Hamilton ~r Alaska Oil and Gas Conservatia1 Camd.ttee Dear Mr. Darsow: Mr.. L.. A. Darsow l\reaSuperintendent Amoco Prcductiœ Cœpany P.. o. :Box 779 lmchoz;aqe, Alaska 99510 Re: Application of Amoco Prcduction~,operat:or of, Middle GroundShœlPlatfoxm"Baker" and south Middle Ground. Shoal tt.nitPlatformttDillœ u, for approval to flam casinqhead ças in excess of the ann.mtmqtti.red for safety for n'tt'e than 15 days per calendar quarter. !~G"""""""l"-;'~ ""~~.,,, T OJ·C.9 ' ::-~"-~,_,",,,,..::.:~:~"~;,.".io>"") ADMINIS~RATION APPROVAL 'J'.' J /';¡"·:"'-I ":":;'~'_n _,_-II.....ln"_-.~.;.-'.......··.'Å~;,¡""','\....\__I..\'.......'~ L.,~ "'-u ,,-,~ \,:_.'0/11 -'1,..'._\'-1 "'\ -\11" June 21, 1978 AlASKA OIL AND GAS m1SERVATIŒr C<::)tttl·l~ Conservatioo ) ) ~~&CJ1~ />, \ '.', J f] J /^\. l^\ (~\v(' /ß\ Lr~ .~:] /1' \\ ~~}) J\\ f~ / DIVISION OF OIL AND GAS Conservation JA Y S. HAMMOND, COVERNOR ~ ':;",'JI: DEI·J.\.ltTl\II~N'I~ 4.1~~ NA'I~IJltAI.. Itl~S4.IJIC,.;I~S ! 3001 PORCUPINE DRIVE - ANCHORAGE 99501 ALASKA OIL AND GAS CONSERVATION COMMITTEE August 5, 1977 ADM I N 1ST RAT I VE A P PRO V A L N O. 105.C.8 Re: Application of Shell Oil Company, oJ?2rator for t-1iddle Ground Shool Platfonn "A" and Platform "C", for approval'to flare casinghead gas in excess of the amount required for safety for rrore than 15 days per calendar quarter. f.1r. H. M. Mathiesen Division Prcduction Superintendent Shell Oil Company 601 W. 5th Avenue, Suite 810 Anchorage, Alaska 99501 Dear Mr. Ma thiesen: '<!.'\ On August 2, 1977, the referenced application was received which stated that due to piping revisions at the Collier Carbon and Chemical Canpany Plant, all gas originating on Shell MGS Platforms "A" and "e" was being flared at the Amoco Prcx1uction Canpany's Onshore Facility. --10. . Pursuant to Rule 4 of Conservation Order No. 105.C the Oil and Gas Conservation Cånmittee hereby authorizes flaring of excess casinghead gas until the piping at tJìe Collier Carbon and Chemical Plant is canpleted. Very truly yours, (/L / ( ¡¡;/c>ý}¿fJÆ~ Thos. R. Marshall, Jr. Executive Secretary ) \ \ I '~ ) ) crC:-:J {~ ITt~ ,~ - 0 \\ J ._::J (rTì '~) . N f: ~ô\ ~~ ~. f0\ ~J) J .J ~ LJL u '.~' u~ 1, ~\ / { DIVISION OF OIL AND GAS JA Y S. HAMMOND, COVERNOR ,1.ltl·AllTl\II~NT 4ÞI~~ NATIJltAI..IC.l~S4ÞIJII,._~I~S 3001 PORCUPINE DRIVE -- ANCHORAGE 99501 , Conservati on ALASKA OIL AND GAS CONSERVATION COMMITTEE May 16, 1977 ADM I N 1ST RAT I V· E A P PRO V A L N ,0. 105. C. 7 Re: Application of Shell Oil Company, operator of Middle Ground Shoal Platform "AII and Platform IIC", for approval to flare casinghead gas in excess of the amount required for safety for more than 15 days per calendar quarter. Mr. H. M. Mathiesen Division Production Superintendent Shell Oil Company 601 W. 5th Avenue, Suite 810 Anchorage, Alaska 99501 Dear Mr. Mathiesen: On May 16, 1977, the referenced application was received which stated that due to the Collier Carbon and Chemical Company annual "turnaround", some gas originating on Shell t~GS Platforms II A" a.nd "C" was flared commencing on May 2, 1977 at the Amoco Production Company's Onshore Facility. For the period from May 5, until May 12, 1977 casinghead gas was fl arect at Shell Pl at form "e'1 due to pl uggi ng of the gas 1 i ne between Amoco Production Company's Platform Dillon and their Onshore Facility. Pursuant to Rule 4 of Conservation Order No. 105.C the Oil and Gas Conservation Committee hereby authorizes flaring of excess casinghead gas until the annual "turnaround" of the Collier Carbon ad Chemical Pl ant is corn(1 eted. Very truly yours, ~_I( bU< -t& l Tho s. R. r..¡ a r s hall, Jr. Executi ve Secy'etò.y'y TfUblJjÞ1 Thomas R. r~arsha 11, Jr. Executive Secretary The Oil and Gas Conservation Corrunittee hereby authorizes the flaring of excess casinghead gas until the Collier Carbon and Chet:1ical Plant is again opera ti ona 1 . Sincerely, Mr. L. A. DarsOw Area Superinten<ient Amoco Production Company Box 779 Anchorage, Alaska 99510 Dear Mr. DarsOj: On Hay 12, 1977, the referenced application was received \'Ihich requested that excess gas be flared at the East Foreland Delivery Facility more than the 15 day per calendar quarter permitted because of a prolonged turnaround of the Collier Carbon and Chemical Plant. Re: Application of fUTIOCO Production CO~1pa,ny operator of ~'1ddle Ground Shoal Platform Baker and South Middle Ground Shoal Platfonn Dillon. for approval to flare casinghead ç¡as in excess of the amount required for safety for more than 15 days per calendar quarter. " 0J~ I N I ? :r ~ "A, T .1 V E ." .A...P. P R q V ^.L,. N 0._ ..JO§-C.7 Hay 13, 1977 ALASKA OIL AND GAS CONSERVATION COMMITTEE Uonservat1on ') ,r / ) ~CJ ~ tï~J 'F ~ lAj t _.~ t,;::", I-T~;J ,<:~) _f ~\ '._ 1/;\ ;~~ V? ~\ t ~ ~0 .~ ,___ Ælf~ ) I / JA Y S. HAMMOND, GOVERNOR I.EI·AltT~IENT «.I~~ NATUI1AIÄ Itl~S«.IJ.ltC.:S DIVISION Of OIL AND GAS 3001 PORCUPINE DRIVE - ANCHORAGE 99501 Conser'Va t ion ALJ\SKA OIL M'JO G!\S CONSERVATION Cm·H'IITTEE ~'1 arc h 30, 1 9 77 ADM I N 1ST RAT I V E A P PRO V A L NO. 105.C.6 Re: Application of Shell Oil Company, operator of Middle Ground Shoal Platform "A", for approval to flare casinghead gas in excess of the amount required for safety fbr more than 15 days per calendar quarter ~,1r. H. ~.'L r·1athi esen Division Production Superintendent ,Shell Oil Company 601 W. 5th Avenue, Suite 810 Anchorage, Alaska 99501 Dear Mr. Mathiesen: On January 31,1977, the referenced application was received which stated that the compressor on Platform "A" ItJas shut down due to mechanical failure. Repair time is estimated to be approximately 8 weeks. The Oil and Gas Conservation Committee hereby confirms verbal approvals given on February 2, 1977 and authorizes flaring of excess casinghead gas until April 1, 1977, or until the compressor is repaired, whichever occurs first. Very truly yours, ) ) /' (/('/ r ð ~ .l,- . í \ t·· I ,---... G-~....·v, ",.,/ Jr.-? rhos. R. Marshall, Jr. Executive Secretary 'I ~.' ijl ···"··,·,':\~;:'f;R;dii~.':,i;i!;¡¡',...·,\:;,;.c;i...,;;,. '", ' , ". ,", ",.,' ," ",' ' ., . .",~.~~~N.\"U*")~\U·";I¡.\t:t· ',n··C¡·-'~·,"'u'I",-..~·,:i~'~"'>":,'di,., :j~.\,",,~ "d:.; , ,~. .,n':....·:·....~~.i'I_1~¡'~i...~t:~~, ",' , , ' ',~ '. ,·~·..,~..:v~l'Jt~rAt'f:'¡\ft~..,\+··j~,,~:' ALASKA OIL AI~D GAS CONSERVATION COMMITTEE February 9. 1975 A.Q ~ I H 1.5 T R.A T I V E b A P PRO V A L.v NO..,10,5-C.9': Re: Application of Shell Oil Company, operator of Middle Ground Shoal Platform I'C" t for approval to flare casinghead gas in excess of the amount required for safety for more than 15 days per calendar quarter. Mr. K. W.' LaGrone Production Superintendent Shell Oil Company 601 W. 5th Avenue. Suite 810 Anchorage, Alaska 99501 Dear Mr. LaGrone: On February 2, 1976, the referenced application was received which stated that the compressor on Platfom "C" was shut down due to mechanical failure. The 011 and Gas Conservation Committee hereby authorizes flaring of excess casinghead gas untilt1arch 1. 1976. or until the compressor is repaired. whichever occurs first. "." Very truly yours, ,.¡/ ' 1// "¡//I ,/ ' / Ii ///." ..,,,1 (-0' \.,,;, ,..¡J l . I,' ,/, //('t¡,· ,'.;. ..vl./ , /'1, \.' .i/O Thos. R. f1arshal1, Jr. . Executive Secretary Tmt:bJn , , 'Ift!i.,", " ,',~~,~:,' '~,""',,' :4¡,y""", ,,' 1",~rt'·"J,~.,~:, On November 17, 1915, the referenced app1ication was received which stated that thecompr"e!$SOrOfl P1atform "eu was shut down on October 28, 1975 due to mecha;ni ca 1, fa f1 ure.Repair t 1mei s estima ted to beapprox11tate 1 y two months. Tbe Oil and Gas Conservation ,Corrmitte hereby authorizes flaring of excess cas ingheadgas u:ntilJanuary15 t 197t'i,or un ti 1 the compres sar i srepai red. whichever occurs first. Very truly your's t /) I' ':J ,",/ I" i' /' ,', .' I: I ' " ' l \ t,tle'"fJ/, I) t." Thomas R. Marsha11,Jr. Executive Secretary near ~1r. taG,rone: t1r .1(. W. LaGrone Production Superintendent She 11 Oil Compa,ny 601 W. 5th Avenue Sutte 810 A,ncborage, A laska 99501 ADM I N 1ST RAT I V E A P PRO V A l NO. 105-C.4 "''!WI'-;'" ,4 '1,.'''- 'Ji __,'I I~·~_ ,It.~",,~.. I. ·,Ii.... \0, ,: ,~" L U" .Ia-.... \A.0 0,\0,'0_ \ \-~ .Þ' __101....\..1. Re: Application of Shell Oil Company Operator, of Middle G,round Shoal Platform itCH for approval to flare casinghe.adgas in excess of the amount required for' safety for mt)'re than 15 d«ys per ca1endarquarter. November 24, 1975 ALASKA OIL AND GAS CONSERVATION COMMITTEE TRl4 ~be Very truly yours, ",-¡ )' / t ÝJ ~ ,," / I' l,' " ,/J i 1/ I /' 'I /1<.Þ7 /"¡ 1~vW--i~'u\· '/' Thomas R. Marsha 11, Jr.. Executive Secretary On September 16, 1975 the referencedapp1icatfon wasrece'ved which stated that following the issuance of ,AA, 105-C.2 which pennitted f1aringwhile a compressor package was being replaced on Platform Baker, the compressor package was damaged and repaired in transit resu1 ting ina considerable time ~lay. ' The 011 and Gas Conservati'on Cormtittee hereby authorizes flar'1ng: of excess casin;ghead gas until October 31. 1975 or until the compressor is replaced, whichever occurs first. Mr. George J. Ross Area Superintendent Amoco ,Production Company 80x 779 ' Anchora,ge, Alaska 99,510 Dear Mr.. Ros,s: AD"1 N 1ST RAT I V E A P PRO V A l "0. 10S-C.3 'A"'_,_·. _'\I:~..A_""I\.IJ... ...... "'1_,;-~"/""\-1':_Ä~"".,,\.: ...n" ,,, '\' '.",\.".' -"~"'''''...('''''''''''_:'I-~..:I'.'\··'.),·,¡I.,~'oj·:':'''','_-'''';,k·_,,:" '_'_J/\"",.,,-¡,oIK\\-' _''''v Re Ap,p1iœtionof Amoco Prodµct1onCompany Operator,. of Middle Ground Shoal Platform Baker for approval to flare casinghead gas in excess ofthé amount required fori s.afety for more than 15 days per calendar quarter. ALASKA OIL AND GAS CONSE,RVATIONCOMMITTEE September 22, 1975 ALASKA OIL AND GAS CONSERVATION COMMITTEE Ju1y 15, 1975 ~_;P~¡ ,I,Jt J",,~,T ~!.8"I J V~"f.,~,~ f."P" R ~,~'~1"p_ ~t ,.Q,L,lq5~C.2 Re: App1 ication of Amoco Pr()dµçtion Company Operator, of Middle Ground Shoal, Platfo·rmBaker forappre,va1 to 11arecasinghead gas in excess of the amount 'required for safety for more than 15 days pe'rcalendar quarter. Mr. George J.Ross AreaSuperintendent Amoco Production Company Box 779 Anchorage.. A,1 as ka 99510 OearMr. Ross: On July 1, 1975 the refe'renced appl {cation was received which stated that all produc1ngwells have been connected to Kobe lift and gas 11ft operations have c,e,ased.Conseque,ntly, the existingequ1pment is not properlyslzed to continue asa fuel and sales gas compressor and a different compressor pa,ck- age should be1nstal1ed. The 611 and Gas Conservation Cømmittee hereby authorizes flaring of excess casinghead gas until October It 1975 or until the compressor is replaced, whichever occurs first. Very truly yours~ ./ , Aí¿uJJ i ! '-,J . , k' " i ,I , /' n / I ",/J ¡ ~- Thomas R. Marshall, Jr. Executive Secretary TRrt: be tnr:J\i::m.~"'~Ißt JAY S. HAMMOND. GOVERNOR ALASKA OIL ANOGAS CONSERVATION COMMITTEE Dåcember 4, 1974 A Ð M' Nt Sf R A.Tl VE A P PROVA LN O.iOS-C.1 'U,.~,./f~~'" '._.\ ;\'\'\~'..\_r" ··II".H,.,'\" ..,\... ')",' --f_'.~'AI_-'~·~,l_\"~".\_~_""C,,\:,,:.~"·"-..:\ "~),'-I ~---'"".-.;~- ......Iri..,...,:;JfI." . ,,, '" 'Re: AppHcatton of Amoco Proc:h,ct',o,n, CompanyOperatorì of Mtddle, Ground Shoal PI: at form 'Baker for approval to fh!re œslnghead gas tn excess of the amountrequfred for safety fo:r-more than -'5 daY$ pe.rcatendar quarte,r., Mr. George J. Res's Area Sups,,.t n,tendent AmocoProducfton eo"pany Bo>< 719 Anchorage, Ataska 995.0 Dear Mr. Ross: On November 27, 1974 the refereAcedappfJœttonw8sreœtved whIch stated tha' dl fflcu:lfy In obtaining repatr ,parts for' a compres,sol'" has resulted In flaring that exceeds tbe 700 MCFD maxImum safety flar$!for 13 days during the perfodof October 25 through Nowember·, 26". The 01 f and Gas Conservation Ccmvnlttee herebyauthorlzesfJa.rtng of ~{"excess casinghead gas unt' I January I, 1975 or untf t the compre-ssor Is repaired. Which- ever occurs f' rst. Very truly yours~ Thomas R. Marshal I, Jr.. Execut J "Ie Secretary TRM: cha' <*28 . . C·.C. /02--C- ,(7_ r~d.f~±ìvl,~":·:~'\/~·:~~ ~~.¡ fø4-J ¡leu/IMl ~fi7 - tJJ~~ J r,;¥~_h- .C'~ b_ /?z<'éék c77/) /º~~.I 1._&/~<1 (#~uwYtØ? a'lðH#<'¿ L ~~ ~Ø&<J;P'" ð¿£-.4l¿UlAJ ~ 2vº'd-<V ..ç .£. )-f.ur-e'Y( ¿?1/1 ('L ~/¿~/1 ~-aL-: . . " ." '. f/' 1 # /J t?/ -L 3/. th'. 0.3 0 . (¿"y/lfi4¿fla 4?fdeAL(2.) A.S.,,? ( ò ç ò;¿ D,)' -.5/ oJ: 170 (¡J(t!) (6)/J~~ Æ~u~'2áthé£~1~ fJdL ///ltJC.:;¿ C;Ô I / 2. .-;;t. dnnu;1/6 ~ ?'2",J.-£,-;L ,N¿Q-ak ð4 ".é'~Q ~~..___~.Þ~/U~.¿Mr'7Z,M- ¿ O~l ¿'-<'f~7~.Þ~~ ._.__..._...._..._..2f~ra4^è~ a-£~t ¿«J /'IU-£ð,/tLA- ~ ,Ød;è'~~ t!Z//]Ø«IJ- }. !~4 ~~ /~ rY-: -1f ~¿~y. ·U?<! .p<~_ ..:5: .-/if ~---' 2 ¿ ~)<<-A'/u..~u'!/-f ~~ø~ œ4/14.~¿Jt4¿7¿;;¡¿ 4-<~~~C-<- k~<r-~~ -'~ . ..~._::/tj~¡¿_;jÆ~ 2- cw a¿~Jw.~"(. .A/~¢- p"cd A'L<!A.. I ~ 2¡Lcf~7;£ ~â ~~ cw~f ðVJdc-6L 1 .-~~.l~f/'.<~¿~ ~ /HAJð,:/ /t'T~<-'''4 /1~~c<,/::t: . ~.. . .Æ~."...c ýK-~/,.<-L fi-€?- . g;;.,. ~£~~ ...~,~ # h ¡f: 4d J eÞ~~d;J¡S ~·'-UY;.£1 ) _~;:"L~~ r~/ ~C~~ r ? ¿&~~7~e~ 7~¿ ~ .V'î7 ?!H/5;L ~~/,~N/ .,c<J/ fid"-/ctl/U4,;;u£, /Æ-1 é-1zr:+- ,,¿dA yf"-~, á I' /"'~4</o- -;) ~-'- /Z ¡¿{J., i~/ 7 ffI-< /Î~h' I .d&;7 t;t:ßø~{~t~>cf a// cPe&~f't; Ý:;'é(pf;."e. ~ /F¡¿é~'~<J- (Í/.,/1 A é S"O'. ¡z / /l-s-.3ð. 0 (/'IOG/) ) } }0/ IfZ n,-¿"h'o'l í? r;:J','?,1 âA<J? t'Æ-t,<,,-<,F . ð-1';Ù( /À.~ £. Á",~"-.. <.~t# c- /A~?7 'rS e,.'1f/t/ë-Ic,,-£Sði" 0t~<.22";L..l:~ ~ ~ .{ c¿,,~''-'G ?'~<?7;"'" /~. :ûq.t. /t/ ch'yt/J(U /S/'n . l p('/ /dj <'0..' c:Þ¿~/,.;>,,,/ - " " . . M6-1 &r<c¢~ &.04 ¡=k.Ú"/~ k~ t;?U4 vi'en ~ ~ ¿þ~ J Æ~' / " -_. - ---~ . . !. ~4;5 ~Mi"cJ ~N6 ?H'rlG- ~". rJ7 .~.:d, } r0:t~¡/,'-Lev/~ ~ndÁ.£ þU, '// ~ ~il;r·uJ?~. .. . - , ·N2.dJ r"-//2/ cdJ/~?~~~~=~~:~-··i ~....;Z.~:: ~~"/./~._~'77h'~~-:~: i !l t1A 'M II It //11 .~.,.~---.-'-'_---- -,' \' , _._'--'-'-"-"-~-""'~ __~.._2._z)~ . ,Ø' þcJß. ~L=~il--¿¿£;;;¡¿¡;': ~~-'-_.'J $,,-hþ ¿~ ad ~~2~_____~___~ I !J -' r ===---;-4 Ø~/ ~ ~~~/i~_'~L:--1 =·-=:-·_~Z~ ~~~ ~~._uJ/L£.._--_-~-··1 --- ." .." - , ~"' -.-,-.---,---.-.-.,,- _.....__._~"---,._. ',' ..~. ¡ î . ..., ....~------~-----_:_------ --,--------, ¡ / ." , .......---.-..---.--- , --.----.--~.. t ~ ¡ , -.-,-.',--,.--:...-;------- --'---'---"-' - ¡ , î I í ---'I \ ----_._------"--..,.....-~--_.._,~._._._.".._~"--,-...~........_-',-'-,.,' >...,-- , ~__M.___·_'.'_·__ -..--.--, -~-----'"._.._-_.----- .__.._.~._._____.___.______'______._.___'_______.___._,___._..__.__...._w' .-_..~...__.---------- ¡ ¡ I .... -..-.-....----------..------.-.-.<...--.-"..--.---,.-.----.---....----.-.-.~._.....- '" 'f , f ¡ ".---.----....,...-".~-.-.-.--..-.-.-..-..'"-..-.-.- ! _ ......._~_____..___......_~_______.M,__..__'_.., I < I I ,: ~ 1 - >-... .". --1 ; . _ . .0- _ - .. ~ .;. i I I -. '1 ¡. .; , ~' __.¿ _L'4_ ". '".', " l~::r , _ L ic.:Úrr. IiO zr:. ia: :;Jww'< UJW:;)W ~w ..,.f.I)O~ I/JO_~~ ...,U) 1 1 - c a.. o m 19 66 1961 '>"'~~''';'~--'''=' ¡..c, ,--r'" --~;T> -~. -~~--- Itrs~¿I'Lj-! T-~'-µ :-+- ~ ~: i !. ;' ,....__...~.. -,.' OO.ii'!' '!~. ~ ~ z c: 0 Q ~ ~ ~ ~ 000 _. . ..- I t + 1 ! 1 -~ - , ~.. - ':""'-F. :~-t"- ...- _.,~ 4~~ "- :-~ ~-_: ~ ..: a; ..: ::;; z ::> :l 968 .""''''_If. e ·4 : - .-. . , : - - 969 ~ ~1t r-r- ~ ' ,: -r--r t . .. ,: ; :I: 1 ~ t:. :tt. I·: ". , , ; ~' j J. ....:4 . : I ..:.;..L I ,/ I~~ . o w o I; t 1970 ...., a: 0( ::< '.) w o - "r:: , t . ' , t· ~ . .. ¡ ~ '-ur - ~ r': : "ï' r >- ~r . + ¡ "T- , 0 r 'I ",-... I :T . .WELL SHUT-IN WHILE ¡COMPRESSOR DOWN IN .. ,1971. AND IT HAS NEVER :; 'BEEN RESTORED TO PRODUCTION -:-: , i",1 ----' I-i. . , , 19.LL c:: ..: ::;; iV' 1--1 ~ ij" -'4'~-- ; J, ,. ~-~~ /: , ' OJ ~.. .r : :'" . -. ., ~ . . ~.. 'IJ f,¡" . t-=-: .'1: ¥: 1 i ::> .., ; . .. W <II o w o I a: « ::Ii 1972 , ! f·....·' -.. :-~. ~ .: III i c: ::> w ..., '" 1973 . ~ '.) a: ... « 0 ::¡¡ 'T ¡ : .. ..:~ ! 'l-il~.j··l-~, :; ~i ~'. :; ; ¡ L:lL :: ;tr ,.;' ~ 150 BOPD LOSS 'h i . . I ',' ,': .' , ! ¡ rlr!JTU,n·t;- ~uJr ïffiLJff£ ieLda:' ·öœ··o ~ w ~ ~ w ~ w ..,.,021 o~ Q 1 ,.¡. - ,.......i . ~r-;::: . . _!. -' ~:- ~ -¡ _~_.+-.L "t¡0- ~ z a. ::> ... ~ ,CD 19.1.1 . ~. ~ ,. ~ ., ¡ ·-.,·~t :::1" - .;..;...:..... -. -.-- ~:'~-\-:~-: - " ~-~.:. 1 . l' +.¡ ;,+: ; Z Q. ::> ... .::1..- II) 975 o 00 3: ~g T r »ïT 3: r oz~ 000 o· c =z mO o<n O~ o ]> r "'" Ot U) Ot c a.. ~ m ; -;-. ~ - , : . : .. - . . , ; . _ - u -! .., I r-j ~=r OpOO : " : : .. c : - w 14 T,ER : - - ~ - : : " : : ; .. : : : , , : -- ! - : : : AMOCO EXHIBIT . "~,,,o .Io5.~ . 'i.~,.. .. ., 0 . '. ._ .,.. _. 1., '~ _ . . , .'. . - ..' '... ~~ . . .... . . ." . .. . . ' . , . , ' c. . No.3 r 4' -ill ~ ~ J -t: ~ !:: 000 o NO 3157 TEN .. EAR'!oO Ð ... i'iO " '--Lt~ RATle HoJ "G GRAP ,,~....~ . JI. ';"~.:'.~ ',. ,~" PA~ER V N,S fOC RfCT "ROM COOf:.X BOOK CO NORWOOO. MASS Q2()62 o e ) 1- ) D e 1968 ¡: .' . .. ~ .~ ; - - , . . ' .........--. _~_ ~_ ~. t_~ . 1 .-.> --'-- ,~ lillJ -... .~ . . ' . -. -~ . . ~ T ~" ~ "~ ·~:llT: .- ~-~..: 0. ~. '" . OO~·- . r ~ . +, . , t ' . ~~ZQ.L\ ci ~ . . O:i~~è5 « z c.. u :¿: :) \.IJ W -. '" 0 000 -. .. - ~ .' . - ,_0--_'4 , . , .- .. : ! +~...~ v.._......1 i j . -... j... --.......... ~'~~~~ . ., ... , - : : : , .,'. . - , . j ... '0~~ .. r'" , +. t t-~_.. ~ .. ~-.. t-~ ¡ - > J.... .. . . .. ."'T- ....."""'T :'-i,·;' , , .. <0. 1-. +... 1969 , , q+t; . : .. ; . . : H , '- . 1 -: ~~'.;~ ~ ~'~1 f ;::;:~ ~.::,:: -J . .. .-~ . : . . a: z c.. « :¡; =: '" '" 197Q. : ¡ .. .. _. .. : .n~_ . ........ -..- ...-,-.....- .. ;:; i- : 1/·. I 't': '. ~ ~.·I! ~: :/: ~+ ; ;t~ ... '. , '1 4 - .~, ; - 1911. J.L Tf :, . t ¡ : J I - f.) a: z :.: ú a: z 0: <) ... « :> '" ... « :> '" .oJ 0 ~ .., '" 0 :¡; ., '" 0 .. . ':'''' ,- ~ '1 . .~ .¡ ".i¡~¡ 1,/: ) ~"\? . ",':.:" "j ...- .,. '~Tn:r: . :-.:.: -'!- 1-. ._.L ·IWþ"~ "1 :... ~ .; ~fL .~~ ..~ --; ';': , . ~ ._~ l , .- - ir ~ .... .......... ; . t:! ,. .-. . L" ~ j i ~ -t i --L1 ~;_.' j .. .,:~ ~'~"~ :;~' !; Il:~¡ ~. 1;: :": : :2"_L; ~~.. t .;-~.~;.-: :' :.,~..::.:.- ......--- '~;-rF~ -1-:'" -t "' , : :hl ~."" ·,1; t:" . 1 ..,""' , ~·~1~ ~ ~~.~ I , ;,~ ¡ . I ¡ 191.£ 1~:::.==r_'!=' '=¥u:=t"T-·l'Þt1T ; f~n· sLt:.. "'- ' .- '... III:; ..' :;. :_-:.~. .;:.:-:.:-: ; :'~-:¡ 4_: .;: -::---:-:- ::'-...._:,~1·:J¡~;=:-': t-.:.-..'-~"'_ ::J,.;...,.., .:..:- -~... :.t-..,..'.- ~, .... " ...~ .._ ,..... ,.... ,'.....- .,.., .-. -...t:' -1 ..t..-:"'::=~".."':¡¿·'::: T.. .. 4' 4 _.... ._..~. ._. '..__ _.,. . ..'_ .._ ._.',_'.... _.., "..___.. .......'_~=L:...:t::.:I:.:: --,...±:±::t:.. ... I:~ ~:~..;~: ~.:. ~;~.~: ~- :: .:: ... 1. .;j!.':i·i:~tiiL-tj~1,£Eì.=· - l:I:H-EI ~-: ::-~ . ~:. :::'::; ':';' ::.:;:::';.: ;~:n i:.'-¡::': ::;..¡::;- 4='ff.-8: -+';:-i;t:i: -,:t::H-1 '...,.. ,., "_;';:.: ..,'." .." h'_ .... c,; ...' I, ,~.., ,... "....., :¡:t:;.µ:r :4t:r~·..¡:. "¡C. ~ .~·L~.:~~ f·1 :~"~ .~~..~~~. ·~i~·:~ ~L~L;.~ 'Tr~?j:·~f.¡:¡i~:·1:F€:i.Il!1:¡'ltTVff=:-±1~ :+:'!,,-rf; ,,±Cj¡;! :!:::'¡,:¡!~., ~L~·I·.."·IT~ F:.:f:f..: =->~Ttffi-:~' é.¡;:r;n:'t,=r't:li.f~=~·g'j·:f~:.:m l;"~:::-"·;1~.U::t~+:Ibr:. :"~l<··:'T: c:f:i:1:: ·';;.t'YI:-:::.i; ]",7.:.:: ··Lt,if:L:f Jæ1 !:~~!~,~~:;;~~ :-:..:;'~:~ WELL SHU IN:3 0 DAYS IN AUGUST,1972:ffI.J:c :,:;.:c:+¡.:~.::-:c; ¡:!.{:c ': DURING P ~LINE FAILURE AND 1: 4" ,_..... _ _..._....... ......__ ....:L'~~~ 4.. --, · ......-. 1;'-' /..L_.. SUBSEQUE REPAIR . "... _:'~:-·:~~f=~ y~.....-. ::-1·:::: ;~:. :-:- ..--- -.. ~ ...~.-.-./ . ;~-·t~-,-; t-¡---t-- ~_.;,_L~ ,:tl·-r ..,....~·.._·%,·.··....._·.··1·"·' '1"~'';-'''T . ·"·h"'H';·j·'1+'-'· ,..i".., ;.,.+.,~ ,1'lr ·-...~T·!-··¡ -,' ',··,·ti--··"....-ril··,·i- -"1' .j.....:..,.'1. ....~i.,.~....;.',!lëH1fti...1~'.,+',·.¡.· ,.,.... ,'1 "'T 'T-+' i-- ·..~Trr+-:'-t'-:- .,-+ ...1., ,'-' -i-·t-'·'-t"W·T"· ·Ult ,- I ¡ .;. ..¡..': .'., :0 j t · -t..·· -.- .-:: '.1"'_.' t-~-ït-t· -:....~t--¡ ~.+~. t-·;-,,' -.+--~, - -~·H-·1-· ,- __ __,.J ,..,-.- -f-.. ··i-~ --t ;'T," ",it "1,1..". .;-4·¡~r .; ,+·-..ì.-t-4"¡'1B" ...r-t'Q·'1·f·""·L Htr..¡.,]·:¡· ,+. 'f'·t"·i I· H- i; " ¡. -t ii1: ·:h...·'- ,,'ft. r+ ':~lt'+ 'H-j· ,. -j+-! ·~TT'+'+t'· " :.!.,.¡~, i',' ,';·j·'··.;i t'7~'+' .+4--+-1-<- ~-, ..¡- 1-, ·,··~J·t-F:·'·::· if" .'1i,11'I'1" -' : "-'r .j t·t .;-.,.-... ........ .,¡ ,.L '-- +~... ..L., ·h" '.,...;.'" 1-+.:, ..+.... : t·.' _ --.!; ¡, I' : ¡ f . . ,,. I ,,,"! I .. j" Ii ¡. ¡ I t t : , '¡ I I , , " ,,' ¡ . '" ,-. J. j '1' . L' ;' I· j' ,''', ',I 1+ ., tí -+~.: ';+. ~-. r·f-lI ~·'r~t t ~ .. .-~¡.,- -rr-,,!,4-r '!"' - '. r- .- -¡-:--·...···4· .-., 4,·t -.-t-~ ·-t- ..l_¡¡_j'.. -·1-+-·, ,. , " '" '~ ,.'L ,I, . th" ± I I' t " I . I l" II ii' I' Ju" i-! ~·'-t¡·~'¡r~ .. of" HI""~" .. íT<1 '·1·...-'·'· '·¡'··-·-t....·' . "t' H \'~~t· 1-H.,:f4_LJ, +, J' t ·T', ''':, f ~2,l ,I ¡ . j! ' Lt" ·1.1.·1 l; .l.l, ~-f,", ,I L,l,' j.-I- 11. .¡', 't', ,. : 1 r ' ~,. . , "I, +tH' , I , I I IJ I, " I ' I t-l 1 ·t-t. '_." -...,T..-. c . ."...;. .,. - . ·í4.· ¡.. """.' , .j< ,.. . ., . .'.1 -, I ¡, '.. ¡" I ,~ , I~,:. '!; I I :" ' I I ! I ! I ' Ii: I !, ': I " I, I : ¡I' .;.;7+gr,j¡·aH~;:':TFj ~,:J..; ~c;;::frt¥ ,::t.U:Fo ··:cJ=.'i"' 01:"11: T;' if =TcfTf""·Lii:~-E ~q1f." "l~j,C; . ':-f'·.:=~ i+'n.f= ~:':-~~'~~ n , f U+F ~i;c.LU::i¡' ¡ ,p.j ¡t ·~=ï;1f: j:!:¡~'I:. :'.; ; '-. :l:··~ ::::~ T::~::.r-'i:..¡. t _~r 1-~. ;:"''f' :ie'" :::~:I~'flI .+C1,; ; ,1,·:-:: ::::,.1:;: " .l·If! ", f:E' .,.... '''''j.. ~......._.:a.....;:::.........;:7:~....¡ ..... .~.~~_........ .'I·.··.,'¡ .--1·.,4 " ,4 ........._, _. ........-....~..._ +_...__~¡.::. .....~'.. ,_." . +. _+.....__ _.. -+_ ..¡....~~." . . . . " .1,." ___,__.__ _, ~." ~ ¡'....' '_ . ...... .~·t· ,.......... ·····H: ,+......+ ......ltrf~~··..·'t····.····'··L1+'·-t..·t4=f··t+¡'1' t tl+--r: f· ... -. -........-.,-.. ,....-.... .-..-~.~ ~-. "1' ...-::t. .....t--··..¡·t~ !·toi~~"+- .¡~..,.+. _cT'+- - . ,.. .._J. '.- ;".:.. ~ ...~ :r ~~-~ :~.--::.-:--:- t.:;::.:~. -..¡:;~.:-t;_ .-.: --- .:,.-t-¡.: ..f ·T-~"1:~:. ··:-~~:~t..·:· "'-'-1-~ ·;··::r-1--t: - 'r':':": ·~i::t: .: :': :'1:r;t:,~ T:·::;::· ,::::~' ';;;',; r: ·n.:j:·,¡'::' U' 'i) :!'t~¡::. ,:::t·:· ·¡:b.:! .!:L·!·tï', · ..) .,. ':st· c. ..~.;-t" ,...... .,:1., ~'., ...t:.'~C ,., ¡ ·'·~j-'·i·"··I· '-i--"" 1: i:L¡-i; .. .,....... ,....... "-''-'r-<' .. ,-. ~., ----i'--"¡- -+,.- ., I-~"- ...., t r '·'·r·!~-t-·- .,....'-r--t- .l. ---+-, '·I·~~ tiP!--t:mU1 ·;X1:!~r: ;-.j c';; ~jcLi;> '';':1 ' ~f U¡-· ~ ~',:¡ ìf;ë~":t.í::jJ.:.E +flj:;;':~'.!Ff~ ::.~·;?·:i~':' ."iT ¡j:;: ;<:'.~: i! . ::~".~ ; ¡,. .:':.:, ':.ii··!-,:t:Ï:~:f J;:;~ ·~IU ·~ij·~::';:~T; i~: :~;i;! ~:¡¡i;,r:.1,i·..~1; ì'::;:i;'¡.'·;·i·':€L4Jr - .___ ... .... .'.... .... ..__,_ ..'_...._... ._to- ...,__..._.,....__ ".-', " ,_'.,. ,.....-_._ _'._ _.,¡. ''- _ it, :'.. ',. ," ,. . , ,. ,. .. '...... ,...,...' '.' '.'~±.r~.j...=f:t-'·c¡';J.i:t: ~ì¡: ~ ~, ...:-;<~;~ ~·f?+~"~ :T~ :.~' :~·~f=~".;~·~~;t.~·~~·~Eilt:~:t~-p- ~tJI~f: : '.. ,r.:. ,.t..........., :.,.:,.:."..,.,,;., q"t++.1,..., ~ .'i!. --I ..-.. -+.:.,......,..~,..- ....... . . pO .~ .·...r- .~.__J...,._~ - . , ,. ..;:...·,·t '-",,,. ';'" " i-- 100 BOPD LOSS' . '''ref- ,; '-t + : -. t.i .-¡.~-:"~ -r· j"_t.': ·j~:-:-~-t "1,2.; ;- -~: , 'j i .._; ~r·=+-1·+=¡t . ·r·,"" :, :'; ""....;-'j.~,..h...t·~"'l+r#· ¡-H- r- ..,,'! r ~.~ ...... ..~.. .,.., ..,...¡ .'H~' ·,"t.~+. f-t= . flu.- ',' ":":; t·,·· :.:: 1. ... ·f:·:""'-;-' ! "jjH ' - ,i" +: ... 't'T"-! ; :!:., ., ... r'···,·· ..H· ,; ..1... ...c.J_ 'i"· '. ¡ I, ¡ .'...' J ! ; I I i ~ I ;- .~ : f ¡-; T~. ,1 1 ! t· ¡ ~-,i :..; ;..~. f- ~ t-+~t + _L! :t~~f . ...., " ..., ..'~.... ., ....,.j.j..l ..,.1-., I ~L_ tçJ... !' , , : '" " II " : I I '1'+ I: . ...,' ..,; ,. " ,;.,.. ,,!-I-.. t-r;..'· .,.. T'.-t]. , ,I' , , . I" , ' . I I " " I . I I , , ..,... , " "ill1 L 1-.,..+[""'. ¡"I!., TT+)..1.. .:. r+t· .;.. 'o..J,..!..;.... L.i...;...L L ¡ I I ~ ! I I I I' I I' ì I I I I L.w.. 10 ~~i~Ú ia:ö~za:ô~io.:ò O:E~~~ ~~~2~~~:i~~~ 19]3 c: « ;¡¡ l.. z :> ., <l. .... '" 1914 .. ~. -. 19.75_ a: « :E 1976 1977 00 - Q) .... ~"'D "'0 Z Z.... o <D~ m ï a o no ~ m (;) :0 »» oz r- .... m 0,000 I~ ~,; -;~-. t-: - .;-.:..:.; . . , AMOCO EXHIBIT C. O. 10 5' - c- No·If 000 o NO 3157 TU. EARS .-.- MO"-"HS 3.tN.!- c £S fu,TIO QUUNG G~-.>%fu9~ IN IJTOCKDU'£CT J'1ItOM CODI:J( .OOK CO. NOAWOOD,MAsa oao.. GRAPH pA.PER ® """1'18 .a. D 0 CO. I () ç- ~ C. tYP'" .'f<:, -+,"-i=t-.:..,~?'±::::r·::.T:;t:P !'i: '!Y·:-t'¡ ." c·,: J ' :'1 ;"" 'I' ,:, 1"'<>"'1:.·' 'é': '.Et:T1"-'f";·;¡C'-P·¡'-,'''' '.:': =:!;', .::C; c,~~ I':' , , ' "WELL SHÚT' -IN'30[)AYS-¡ N ÄUG'ÜST~'1972' Ä · - O:i ':>: :',/ 'DURING PIPELINE FAILURE AND ~ :t::L ::: .,' .- -+_l :.~.~'~. ,.C' . '.'~. .' ' Y. . '.',' ".,./: t.-, SUBSEQ-+I¡UE_N'J R; .~_~r:£ATt-_IR, ·--'t--. 1----,': __ , ".~:_,~, t '. ,,;-:-...:.;~ L ~::~:-y:A FE ~,.., '.., : : . / .. I ':: . "h ..._~\. ,,,,,,,_,, _,__ ._~_;_.~":~:- __ . ",' ~/. :'.; ( '.i ,I .. "';/.\' "., ,. , --., : /, , . V ' l" :~"¡'fc; ·iF:il.~,.i! , . " l' ;-.L:'!'i-~:,..,. :/~ " ! I ¡ ,. n ' :-: '¡~-'::~."f:>. ~': · '¡ + ,. . H !L~"':'· .. - "," .' .,..,' .'.. f":¡ ~, ..,,' ,'.,I.U., 'I : ,! , ,_',"'~ ,.."', ..'-, "i;. ,.,~, -'f"'-' ",~. ,,' ·,,-.'-.,l-. I.:' ~,.-,'., i' '::: ¡!~'.:::.:: J,- ,.:--:~:-~: ,,' c~', . ' l' 1._ :.. _ ..:' ":.::. " .',. ::.' ' .:' ìl ], : ...~':::' ", it: .~ -)/ : v. I . ~' " l' ,~.:" i': ,:, -- L,L ,,: I' ' r "..d 1 ",., I:"'~ ' , .' .L"L. ',"':, ".., .,,';', .."'.' '",,: r-'" I, , , ,. I ' .~- r' '-.. . . '. , , !. , , " . j . ..' , .. ' "I ~ ' .." ~ .. I' .. I ,..,.. ,c. ~. " :. {h-: " , ' , ,:. I : "-. L---- '--.-.1---t=---1----- : . " ,,' -~ ~ - -~-~ ~-~---¡ --t--_L .'______1._ --r=-~-=~-=~ .., ',' "::::~" "" ¡i"~' I , ¡ , ~ ..i_ : ~," 'dZ+'. ~-'$5~,OOO ACID' JOB'REQU'IRÊDC1=-_~': . n " ¡ TO RESTORE PRODUCTIVITY, : , · "~~,'- ~'.; - '. "..~ .'i' :. ' ; ~ r, " .£- :~ =-.'.,J ,·l .1=: f ,.. .,.. ·l. ·~1L -=f':~ .. .::... ~ JL:l, I ' :.~: . ... Fl .r¡ ++-~ I~O aOPD L~ss·=r1-~~ I > l-J+~lî --l-:~ , 'I ' ". I . ' , , ' ,'. :' " , . r-~--- -·---r--¡:-+II. ., . . , L,,¡ _ il'-. ,I .. - '-..! 7. ..3 a: z ~ ., * ~ '.. ~ ;~ ~ ~ ; ~ ,--; 9I§. , 0 10,000 - .... ::¡;:;.~' =::['f'þlt t='±;:::; ::2~;' :,:;:,';r: ::; ,. " ::;" .¡, ....1.;.:;-, ,! ". .." .., ;.:.¡-: :=., ,..., ~;";--'.':. ,."....... 't'.: ::l :t~_ _ _ ::... 1 ::: .';î.; :;, i.t ¡C':, r ~ ;. ¡. : . :. e . -r---; - ~-- , 1"-.. ''''" 1 ~j_;::.~~ . f '" '--I .~T<- .:;. i-'-- T-r¡ I ' ' ..:,. ., " ,'. :-+ 1 t t : ! ~ : ,: ~ '": 1'-î:': ,.,'-,---:-:- . ! ,--- !:: :-.--: ., .--, ,. ,..- ~ .... ~. . .. ... , , , , o Q. o II) 1000 $T-7-~- - ~, -- ?":-: ,¡ ~J ,..... ,. ':::C" I ,., =f r ' ; I, ~~ , e :' '" -- ~.. ~f;'"'' '.. . .1, ~ ~F' .~-; , ~' . I __.._,..1 I...; \ ,- :__. ... +- -.' " ~~. '. - . , ; " .".- ,,- !., ....¡ t., 1--; '. .. ¡ ~".. , ,'1 " : L .,1 " ~~,;~-;~;:;;; ® ".U'Tre ,. u. e. A. o o AMOCO EXHIBIT NO.S' .--.; I ::' : ;. , -, .:, .,,1 Tf""f ~ :", r : ; '1.L ..;' ,i..i. ¡..¡ ,.,:",.."'" ·'Y .. , .' . .. .- . , . ' .- -' ... : _ .__ ~-L ~_ : .. .. -"'~.. :. :', ~;:.:: .. .... .".., , !~.;: ":, ~ ;'- ~¡-':i :1 :'" ", .-t- I _,__~ "~,;::..I '..._ h+h+ ,.,; .!. , ,-iT:: ,--_·tl---'L" 100~ ... c I u...._.__.. ,.., .-.. ~ ..- '--1" ....... .-- -....,. ~. þ......... + i--,._ ._ ,._"-1- . .--..... ~ .. - .. .. . ---. .-.. --., - . .. c.. +_, , I ¡ -.. ~---- .. - ~ -.-- - ' , ... ..-.-, .-. " --... '~.- _.~. .. .-- .. ---o-~__ . , , -. ..--..\.-, ," c.L. .._--. - .. --- : ~ ·-t- .. . Ìl , , .I {) 7. () (5 ~ ~ ~ ~ [19 7.7~ , -.--, , , : .. i , ,- ..- ........- ,- , ù c: i c.: <.> a: z c.: () ... ... ~ ... ... ... :> '" OJ 0 ::; U) 0 ::!E .., U) 0 I 1970 I 1971 I a: Z c: " a: i 0: ... :> '" ... ~ :; ... :E ~ '" 0 '" 1968 I 19~9 ~ z ¿ ~ c.: -~ :... I.õ.I "'" <t l.o,. '" 0 '" L!9.7~ 72 19 _._ 19.r1 19't!2 100 o 0.. 10 ~ II) (i) :;0 þ þ 0 z r- - -I CD fT1 ..... ~ ." f\) 0 - Z z '9 -I 0 .." - fT1 r- 0 MGS So. MGS Granite Point * e Loss to Chak Group, if Forced to Eliminate Gas Flare During Collier Plant Turnaround, in Pinched Back Oil Production* Pinched Back BOPD Valuê of Pinched Back Oil e Amoco's Exhibit No. (" Discounted# Value of Pinched Back Oil $ 15,210 $ 41,190 $ 98,810 Based on June, 1973 production rates, GaR's and gas sales volumes. # 342 926 2304 $ 43,450 $117,650 $282,240 Oil production* deferred for 20 years discounted at 10%. MGS So. MGS Granite Point VS. Savings in Gas Flared During Collier Plant Turnaround Pinched Back MCFD 445 450 3200 Value of Gas Saved $1,095 $1,105 $7,825 ·,4J" .' Amòco Exhibit No. 1 c.. 0 ) 05*-'- I SITUATIONS REQUIRING FLARING DUE TO OPERATIONAL NECESSITY Location Situation ANNA Solar Turbine - Compressor Drive Engine 2000-hour inspection 4000-hour inspection 8000-hour inspection l6~OOO-hour overhaul Solar Compressor Overhaul Dehydration Unit Pressure vessel inspec- . tion and relief valve testing Pipeline Safety Shut-in Valves Testing Production Vessels Inspection of 2 and 3- phase sepa:J:'ators, com- pressor suction scrubber and fuel gas scrubber Inspection of flare gas and tank vent gas blow cases Main Power Panel Maintenance and inspection BRUCE Solar Turbine - Compressor Drive Engine 2000-hour inspection 4000-hòur inspection 8000-hour inspection l6,000-hour overhaul Length of Downtime 12 hours 24 hours 24 hours 3 days 4 days 12 hours 12 hours 24 hours 24 hours 4 hours 12 hours 24 hours 24 hours 3 days Frequency of Occurence 84 days 168 days every year every 2 years every 2-1/2 yrs. every 2 years every year every 2 years every 5 years every year 84 ,days 168 days every year every 2 years Estimated Gas Flared Each Situation MCF 2100 4200 4200 12,600 16,800 2100 2100 4200 4200 700 1548' 3096 3096 9288 AMO(,a,· a1 F'v.h, {¡ d. . -<.. () . I oS- ~.' C " OJ e' Situations Requiring Flaring Due to Operational Necessity Page 2 Location BRUCE (continued) BAKER Situation Solar Compressor Overhaul Dehydration Unit Pressure vessel inspec- tion and relief valve tes ting Pipeline Safety Shut-in Valve Testing Production Vessels Inspection of 2 and 3- phase separators, com- pressor suction scrubber and. fuel gas scrubber Length of Downtime 4 days 12 hours 12 hours 24 hours Inspection of flare gas and tank vent gas blow cases 24 hours Main Power Panel Maintenance and inspection 4 hours Worthington Compressor 1000-hour inspection Semi-annual inspection Annual inspection Bi-annual inSpection Dehydration Unit Pressure vessel inspec- tion and relief valve testing Pipeline Safety Shut-in Valves Testing Production Vessels Inspection of, 2 and 3- phase separators, com- pressor suction scrubber and fuel gas scrubber Inspection of flare gas and tank vent gas blow cases 3 hours 24 hours 4 days 10 days 12 hours 12 hours 24 hours 24 hours ." Amåêå Exhibit No. 1 co; /0)" - c. Frequency of Occurence every 2-1/2 yrs. every 2 years every year every 2 years .every 5 years every year 45 days every 6 months every year every 2 years every 2 years every 'year every' 2 years every 5 years c... 0, J £) S- - ~ Estimated G,as Flared Each Situation MCF l2,384 1548 1548 3096 3096 516 55 439 1757 4392 218 972 1944 1944 · Sitt¡ations Requiring Flaring Due to Operational Necessity Page 3 Location BAKER (continued) DILLON EAST FORELAND FACILITY Situation Main Power Panel Maintenance and inspection Gardner-Denver Compressor Semi-annual inspection Annual inspection 300 HP Electric Motor- Compressor Driver Overhaul Dehydration Unit Pressure vessel inspec- tion and relief valve testing Pipé1ine Safety Shut-in Valves Testing Production Vessels Inspection of 2 and 3- phase separators, com- pressor suction scrubber and fuel gas scrubber Length of Downtime 4 hours 6 hours 12 hours 4 days 12 hours 12'hours 24 hours Inspection of flare gas and tank vént gas blow cases 12 hours Main Power Panel Maintenance and inspection 4 hours Gas Scrubbers Inspection of scrubbers and condensate flash tanks and testing of relief valves - MGS Syst,em Granite Point System 12 hours 12 hours . Amoco Exhibit No.1 c. O. ) 0 r -c . Frequency of Occurence every year every 6 months every year every 3 years every 2 years every year every 2 years every 5 ,years every yea.r every 2 years every 2 yea.rs Estimated Gas Flared Each Situation MCF 324 558 1116 8928 1116 1116 2232 1116 372 2088 3648 c .0. I () ~~ - ( -u-u rr ):>):> ~~ "" 00 :u:u ~~ 0: þ~ þ» « ):>):> -- rr þ» (]J{]J -- rr -- ~~ -<-< C- C- »» zz -- I f (J)~ fTl» "'"0-< :-IN -0) " ~-.J ()J()J I I WOO -.Joo a.e~ ~ I r o 0 fTI o Z G> :E r fTI Z _ Z ~ ~ 0 s: fTI -1 - o Z -1 (f) Þ -1 r ~ CJ S ló- ~ 8->ù'~ ~Dz¡ g.'l-HIBIT 11 0 :E ~ SE.E fiLE -- (,0 J O~-L... z 0 -1 pq =if: 1 \JQ () -1 - ~ J- rr1 - ~ INSTALL TEMPORARY GAS PRODUCER ,¡, - ~ REPAIR SEIZED COMPRESSOR BEARING z . - <.0 0 -...J < N III( REPAIR OIL PUMP LINE, CJ VERSA VALVE a CONTROL PANEL rr1 () , ~ ~ ~ (]1 ~ REPLACE COMPRESSOR SEALS CJ C- Þ Þ -< Z (f) ,.. ~ REPLACE COMPRESSOR SEALS ~~ ()J - ........ " N rr1 0 OJ Þ -< (f) , ~ - CJ ~ ~ ro Þ :::0' I :::0 çn ,H ~ } REDUCE OIL LEAKAGE a REPLACE - .~ GEAR BOX BEARINGS 8 GEAR BOX OJ - ):> - III( a COMPRESSOR SEALS w CJ I -0 -J ~ :::0 (JJ (f) REPL ACE COMPRESSOR SHAFT, III( GEAR BOX BEARINGS 8 SEALS .. } - I , (J1 P CJ :!:f J-. DD d- ~ 0 ~ ~ CHANGE GEAR BOX BEARING (f) ~ -~ COMPRESSOR COUPLING FAILURE 5/26 ~ . .... ~, ()J 0 C- C 0 Z ~ COLLIER CHEMICAL PLANT DOWN JUNE 22 (Tl . ~ (f) -~ THROUGH JUL Y 14 - 22 DAYS. RESULTED ~ IN FLARING OF MGS PLATFORM A 8 C GAS ~ .. -< \) , 0 ~ CD -~ C- :u c 0 ^ G) .0 ~ -0 (f) ~ fT1 (f) (f) COMPRESSOR REPAIR COMPLETED :u » » r -0 ~ BROUGHT ON LINE 7/28 ..' -f fT1 r - (f) » z -f G) G) ïl CJ » 0 » (f) :u c » 3: Ci) ~ () 0 ~ » :-0 (") f.J\ .s- fT1 t' X CJ - - I - Q OJ 0 .. I.f - - ... ~ I n (\ 0 I=t . (f) (Tl -0' -i · ~.---- ~..--- ...-- . . COMPRESSOR PAC KAG E CENTRIFUGAL COMPRESSOR PACKAGE AMOCO GROUP F'L-~..:TF'ðR.M CILL.OI-J SAS GROUP PL..ð...õF'c?RM "C" _GAS GAS ___ OIL --.- DUAL Boo PIPELINES 2 MILES IDLE DUAL S" PIPELINES 2 MILES 8' .sOU [t'I", Io¡ILt~S 1>/1>(: LINf;s ~~ ..------_. --- _._-_._-~._- -.... ,-------~./ .../ UNION OIL COMPANYs CDLLlE~ CHEh1ICAL PLANT ..-,.-- . COMP~E.SSO¡¡ PACKAGE CENnlFUGAL COlli PRESSOR PACKAGE SAS GROUP F'L-b.TF'ORto-t "A" AMOCO GROVP PLATFPRM P-o..ð...KER. \II w Z :; w "-II) ¡¡:<j't (/)-0 (!)::Et :iõ\Ø 'IX) ~ ~ ~ .J Õ S~Ql( (), I (0, (o./oli-c... EXHIBIT I RELEASED ONLY FOR: wm IEVlIW TITLE CKO.8Y DATE CHECKING PRllõ:LIMINARY ..... ...., BIDDING CONSTRUCTION == SHELL OIL COMPANY PACIFIC COAST AlIA AI.ASICA D_ MIOOL-e: G.ROUI.JO ~HOÀL. CA<:.II-JG,HEAO c;,A":> G,ATHERIU AWO UTIL.I"Z.A..,.IC')I.J 'S~TE"" c¿>"K II...JL..&T, ~~I<A DR"WN~ CHECK: APPROVED: IlCALE: ....n....E. :::tt27 . . COMM COMM COMM RES'ENG SFfENG Amoco Production Compa March 20, 1986 ENG þ,T5Sr\ __ 5T AfTE.(¿H STATTEC:. FILE: __- File: FEW-077-383.3 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Administrative Approval No. 105C-15 Flare Limit Exception, Platform Baker Reference: Conversation between Chatterton/Siekawitch 3/12/86 As discussed, the compressor on Baker is back in service. Our computed flare for the month of February, based on integrated charts, was 3537 MCF, or roughly 126 MCFD. Thank you for your cooperation. Please address any questions to Bryan Dotson at 272-8471. Sincerely, &J~fi~ W. G. Smith District Engineer cc: M. E. Siekawitch L. J. Maroney B. D. Dotson BDD/ j r 058/bdd4 RECEIVED APR -11986 ~, ,'.. ," "~. - f' Ala5~ Qil & !.:Ia¡ ,,0115 Anttmrage ~26 III , . . . SHELL OIL COMPANY 601 W. 5TH AVENUE · SUITE 810 ANCHORAGE. ALASKA 99501 November 3, 1978 /i.{), ~ /O~(!, I ?--~ "I r ,:,,:~~_ :~.}- <O^",t 11: 'Ii I ,:3 GEOL I' ,." J ¡<"vr- i! r:I-U)CTT- L;~~:c~1 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. H. H. Hamilton - Director Gentlemen: This letter is to confirm my telephone conversation this morning with your Mr. H. H. Hamilton in which I requested a fifteen day extension of the excess flare time limit for Platform HCH, Middle Ground Shoal Field. As stated in my letter of October 6, 1978, our York sales gas compressor experienced a failure on October 3. Upon tearing down the compressor, we found some excessive wear in the impeller assembly which required it being sent to the factory for repair. We expect the impeller assembly to be repaired and ready for shipment by Monday, November 6. However there is some uncertainty in the completion time of the repairs due to labor union problems at the plant. At this time, Platform HCH has exceeded its 700 MCFjday allowable flare for eleven days during this calendar quarter. I anticipate that by Monday, November 6 we will have exceeded our allowable flare volume for fourteen days. Due to the above conditions and the uncertainties involved in the time required to complete the repairs, I am requesting a fifteen day extension of the excess flare time limit. r~. L. Woodson Division Production Superintendent Alaska Operations MLWjrrp cc: B. N. Osborn - Kenai ~25 , . ,. .aT~ AMOCO ~,~ Amoco Production Campa P,O, Box 779 Anchorage. Alaska 99510 L, A, Darsow Area Superintendent File: LAD-764-986.5ll 5 UK;j' I ¡ CtÓL/f: 1 Gf'OL--~ ¡ ! 3 GEOL/-- ¡i=~;~~~-=I- I i StC- I c'·:·"'-------I ì ,:"'-'-'Nfc~; [rCE·--- C7j ,/ August 3, 1978 Mr. Hoyle H. Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Hamilton: Administrative Approval No. 105.C.9 Operational Necessity Flaring Middle Ground Shoal Field Our letter of July 27, 1978, File: LAD-744-986.511, advised that we were seeking intracompany approval for repair of the South Middle Ground Shoal Platform Dillon pipeline. We have now obtained company approval and are soliciting our partners' approval. We will keep you advised of our progress. Yours very truly, Át[~-þ¡~v-- L. A. Darsow Area Superintendent JRE:s1s R E C F 1'/ ¡:O' - · II L... AUG - 5 1978 U:,,' , ,dSf(]n nf ~,.. "" UI/ an;,! f', ""~, ~-1cL) Cun,õ)fJ¡ 10 . Anchor'~'~n . v!1 cd/on (\;¿r;; #24 · . DEPARI1-1ENT OF NA'IURAL RESOL1RCES Division of Oil and Gas Conservation '';:11e Files June 14, 1978 Thœas R. 1·'J.arshall, Jr. ~r;},/;" Conservation Order No. lO~ Chief Petroleum Geolejist---\',/ and Cons,,' " <-ervatiçm o¡;-ær ~O~,,()5-C "'" / ('t1~r t,,~, ~~7 ¡q; On June 13, 1978 the Oil and Gas Conservation Cœmittee net with uro representatives of AIroco Production CaTIpany. t-IT'. Gary Ma(!;regar and Nr. JQhn Eatm carre to our offices at our request to discuss the flaring on Arnoco prcx1uction platfouns in Cook Inlet waters. They provided us with an update of the flaring sitt.1értion and v;e clarified our reporting procedures to the Þ..ræco personnel 'VIDO 't...'ere standing in for the area superintendent during his absence. v7e told then of the neœssity to obtain permission fran the Oil and Gas Conservation , Carmittee before 15 days excess flaring could take place. kroco :bad " sought this pe-.rmission retroactively far flaring that had occurred during the second quarter of 1978. .AffiXx) had c10ne a very careful jab about notifying the people of this division aJxmt each and every flaring incident that had occurred. The problem sterns fran t.~e fact that rrore t.l-wn 15 days of flaring had occurred .in the calendar quarter before they sought our permission to cantinue \-vith the excess flare. Aroc.x::o agreed to 'l.vri te us a letter detc-riling their efforts to el:i.mi.nate the excess flaring and request perrnission for flaring beyond the 15 day ps:riod. TR'!:bjm , -', ...;(= 23 - e ,. ~T~ AMOCO ~I~ Amoco Production Company P,O, Box 779 Anchorage, Alaska 99510 L, A. Darsow Area Superintendent October 25, 1977 File: LAD-878-960.4 Mr. O. K. Gilbreth, Jr., Director Division of Oil and Gas Conservation Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Quarterly Report of Gas Flared or Vented in Excess of Volume Required for Safety In compliance with State of Alaska, Conservation Order ~~e- garding the Middle Ground Shoal Field and Conservation Order No. 102-E regarding Granite Point Field, we are submitting the Third Quarter 1977 report of gas flared or vented in excess of volume required for safety. The attached sheet sets forth the information required by Rule No. 5 of the above conservation orders. Very truly yours, , ""~ 'þ , Å. /(1 '" ~jÛ/1r~'- .. L. A. Darsow Area Superintendent Attachment JDP:mls R¡:rrf\/- . L..\,.,[ìvfl) '- ~ (}0T r- tJ(.¡ f ,6 '" I,,,~R, 0' _.1 C.GEO,[' rC:ENG l'-f'fNG \ --~~J" -2':~~~~~jG-- I 3 ,,/,;,:.;.'" ____ ,"·.,')'.....7 1"4EI<:8 .,.." ~--'--'--""'" '- ; I 5 EtJG' -1 --- '~]~~iGr:QLf'- .J,~Gfolr- ..1.3 GEQC'T- -1~:~~~ - i __L?RAFf-/ L ,.. ~EC-T I~=()~¡:'':R=~ ! ,'ilL #22 U2-v';Jß (Rev. IO/76i r ... STATE of ALASKA H£N~!tIllIl.M (/1 " f' í,e... ,(þ!'it'r/. ,I or r-~'" -- ~ e TO, I DATE, October 11, 1977 Frederick H. Boness Deputy Commissioner Department of Natural Resources TELEPHONE NO, FILE NO, \ r ¡ ¡ í Shell Flaring Penaltt i I FROM, Peter B. Froehlich Assistant Attorney General Department of Law SUBJECT, I have attached a draft press release to be issued! by either the Commissioner's Office or the Division of Oil and Gas Conservation. It is pretty low key and is patterned very closely after the release used in the recent ARCO case. Also enclosed are copies of the settlement agreement, checks, and my final letter. Please send me a copy of the release actually iasued. PBF:as Enclosures cc: Jr./ O. K. Gilbreth, Director Division of Oil and Gas Conservation '1- I 'I I -- --1 ~ "'~'-'" ,_>- .' x, :',~, . :¡'. {\t\ :'~ 0q~ /! t. '~.'.'''¡ ¡ ! \ .1 r~ þ e . D~AFT PRESS RELEASE Shell Oil Company has recently paid a civil penalty of $5,000 to the State of Alaska for the unauthorized flaring of natural gas from a platform in Cook Inlet. The excess flaring took place during December 19ì6 and January 19ìì. The Oil and Gas Conservation Committee, Department of Natural Resources, imposed the penalty for the violation of one of its Conservation Orders under Alaska Statutes. The violation was the first of this nature for Shell and occurred in connection with the mechanical failure of a compressor on the platform. ~/ #21 ) EXCESSIVE GAS TO FLARE MONTH September 1977 COMMENCED (DATE/TIME) September 24, 1977 at 11:00 p.m. NATURE OF PROBLEM. . Excessive flare due to compressor repair SY STEM FLARING Platform Baker STATE NOTIFIED (DATE/TIME) September 26, 1977 at 9:30 a.m. PARTY NOTIFIED Mr. ,Harry Kugler COMMENTS Should be flaring an estimated three to four days. RECEIVED ocr 2 71'~7.r 1'\' ~ t ~ IJtVHHm~ m (JiI' It P '., "'., "~, .-¡d:J lJIJ!/servatio' '~!~'N1!:jJì!*,1i¡';i' l" II '^:;:tí:: ''(STATUS AS OF LAST DAY OF BONTll Flaring (terminated October 1, 1977) TERMINATED (DATE/TIME) STATE NOTIFIED OF TERMINATION (D^TE/TI~m) PARTY NOTIFIED ~'(Systems that are continuing to flare at end of month Hill be carried forward and termination \vill be reported on subsequent reports. #20 ) EXCESSIVE GAS TO FLARE MONTH . August 1977 COMMENCED (DATE/TIME) July 30, 1977 at 1:00 a.m. NATURE OF PROBLEM Collier Carbon & Chemical Plant Modifications SYSTEM FLARING East Foreland Delivery Facility - - STATE NOTIFIED (DATE/TIME) August 1, 1977 at 9:15 a.m. PARTY NOTIFIED Mr. Kugler COMMENTS Estimated shut-in time 2 weeks R E <: E ¡ 'IE D 0, ~T 2', {I"1Çì71 f.J,!:;J' .....1, Divls!on, of ()!! & GaS' Cons8rvaUon ^t¡,,<-jx~ìf,i"~~lç; )'<STATUS AS OF LAST DAY OF MONTH TERMINATED (DATE/TIME) August 5, 1977 at 4:00 p.m. STATE NOTIFIED OF TERMINATION (DATE/TIME) August 8, 1977 at 9:25 a.m. PARTY NOTIFIED Mr. Tom Marshall *Systems that are continuing to flare at end of month will be carried forward and termination will be reported on subsequent reports. #19 ) Dl:~'"'~ ~~' \ "." ,,"'.---. --r~'~~E-)ltJt ,," =-l~::(; ._~ =r~:; .~~ ~.l··::fa~c 1'''- "... I ,'" '.".".-- ---"'--5 "~K I I ".... -:--rT"'GËÖ, \.~... L__-.'.""-"'\ Þ I 2 GEOl ",,_.,... T-··''''·-..··..'·'· \ ,-'- 3 GfOL --.-'-..."..-..."'.\..'...'...,.. - \ REV -~'-6f¿Ãff" \"...- :1:=~[- .. CÖNFER: ~ fï~E: C:O}O,ç':;;r' o SHELL OIL COMPANY 601 W. 5TH AVENUE · SUITE 810 ANCHORAGE, ALASKA 99501 August 2, 1977 Mr. O. K. Gilbreth, Jr. state Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 f'l~ ¢f" ?W:t/~:7 (,,,>1 A f¡ (J / VI .(~ 1.' AI+,/(jl- c) .,)/ ( 0 . () :t ,'\ "/ ATTENTION: Thomas R. Marshall, Jr. Dear Sir: In accordance with Conservation Order No. 105C, Rule 4, this letter is to report to you that all gas from Shell Oil Company's Platform "A" and IIC", Middle Ground Shoal Field, is being flared at the Amoco Onshore Facility due to piping revisions at the Collier Chemical Plant. This began July 30, 1977 and is estimated to last until August 15, 1977. We therefore request your permission to exceed the 15 day calendar quarter per platform gas flaring ruling. Very truly yours, ,·,·,',·,·-,',···-·'.,.:::::-·-z·- .._'''"''''-~' ".,.,,:"'..."'.~"" .~. "\ (._..._..'(,~.~..;"""~.. "7"':'...,", _.' í I "....", r-- ~-'-I"~ , ,\., ~':.:,. ,..' ,"~ ", , . ..-,'"" .... , L.. "'. ", ". ,.,' - .~... __ '0" _~__ "Ìì-::- ~.'- MatlÌle'sen Division Production Superintendent Alaska Operations HMM/rrp RJ:(~E:j\/f~r) .'\¡¡... '-, .. v LL /~)j G ~11977 Divisk:n of iJ¡! ~~, ".:p 1~'-"l"''''''- ',' ", .,,::1 V ',," I.)¡:;' ve: l! 011 #18 I o SHELL COMPANY OIL 601 W. 5TH AVENUE · SUITE 810 ANCHORAGE, ALASKA 99501 June 7, 1977 Mr. Hoyle Hamilton, Chairman Alaska Oil and Gas Conservation Committee 3001 Porcupine Drive Anchorage, Alaska 99501 ATTENTION: Thomas R. Marshall, Jr. Dear Sir: In accordance with Conservation Order No. 105C, Rule 3, this letter is to report to you a mechanical shut down of the sales gas compressor on Shell Oil Company Platform "C", Middle Ground Shoal Field. The shut down occurred on June 6, 1977 for a period of 8 hours. Repair is currently estimated to take four days. Please acknowledge receipt of this letter by signing and returning one copy to Shell Oil Company, 601 West Fifth Avenue, Suite 810, Anchorage, Alaska, 99501. Very truly yours, -~'''i",:::f§l''~:::;::,'",'r ,..·"....:::,,:,'::,;,:,:ì,lt~O,.~,·"" /."",A~"::Ç""~>",\~".,.."q,.,..,~~~, " I,;, ,,', .. " \. ( , , "" "t.-'-~:'" ,,' '''..,.-L- t-U.-<L.:!...,---.. ~ .--... . ~:<.- ",'~ "'~~~.,. ...../ ,..,/ -- H. M. Mà thìè'sén Division Production Superintendent Alaska Operations Received, Hoyle Hamilton .. HMM/rrp /Ú-~,¡.,..,,( /:1¥U/ cYj' G/.I/'1) r·~:ECE(:\./E[) JUN-81Ç:í7 O;visi,:;n c: Ui. Þn.:·hí..!~'::J(' \ #'" '1/' " .' /If'~ 1 K ¿t,n t\ i.l v :" ..~, :: ¿i'¿; i.J a ti #17 I,~ , 'I 'DIR;f//!// _L~.·...GEOl/l~ __I ..C',ENG· ~ r1 ENG" r-'-' -1"-' 2 fNG-T(}~W\ '-'-- r ~{f NG i i,j;'¡, /IIì i I:. i,K\ ,1/ , 15"r',¡G'~' ¡ :1::~!.. II : ~"~)': C'l ;, C\. I 3 GfOl i .J "...RfV¡-- ____L._.~RAFr'-..-I- ..._,.,/.". ~E.~-'-r- CONFER: -- FIÜ~:;-- o SHELL OIL COMPANY 601 W. 5TH AVENUE · SUITE 810 ANCHORAGE, ALASKA 99501 May 31, 1977 Mr. Hoyle Hamilton, Chairman Alaska oil and Gas Conservation Committee 3001 Porcupine Drive Anchorage, Alaska 99501 "\ ATTENTION: Thomas R. Marshall, Jr. Dear Sir: In accordance with Conservation Order No. 105C, Rule 3, this letter is to report to you a mechanical shut down of the sales gas compressor on Shell Oil Company Platform "A", Middle Ground Shoal Field. The shut down occurred on May 28, 1977 for a period of 3 hours. Please acknowledge receipt of this letter by signing and returning one copy to Shell Oil Company, 601 West Fifth Avenue, Suite 810, Anchorage, Alaska 99501. Very truly yours, Ç~2;~~ H. M. Ma thies-ên Division production Superintendent Alaska Operations Received, Hoyle Hamilton HMM/rrp " ,I ~,. ~il /1" VF~'(, I 1/'/'£ í.ffi~ l', ~,<:ø ¡ j I I I' V:;~lè'~ ....) .f.,~ " ". r (.·f! f ._ '~ø t, i ¡ /' /.. ~ t1 , 1 ì ! JlllJ ..~ "--.' . '.' . ~ - '1 1Q''":~- D:"Iiis¡ "1 ' , ,;/7 C" C" .. . I Oil Ar:~~hol;"~"!J,r'" ~':j." l{.. i ~-I~,.. . ~ '''",/, ~1a.!jDl] #16 ') '~ ) I. 6T& AMOCO ~I~ Amoco Production Company P.O. Box 779 Anchorage, Alaska 99510 L. A. Darsow Area Superintendent ('~ I' DIR' Iff? lë~-GEÖL tlli" 'I-C~-ÉNG }¥~t~ ---,--,-"" 'L, I J E!\!G I '---r-2. ", [!\!G·'·','Wl,·' ' .-- f- - 3 [~:::) ¡OJ !'_'T'H_~ '" '.. , ". I I , I ~~' (- I ! ", I'~' I ' I , .. í I May 11, 1977 File: LAD-388-986.5ll Mr. Hoyle Hamilton, Chairman Alaska Oil & Gas Conservation Committee 3001 Porcupine Drive Anchorage, AK 99501 Attn: Thomas R. Marshall, Jr. o fC Î" (oP'1 ~'p Þ II/! Ç'Ci. A,Å I (} L.f: . B Idf1dYl }~~, A-A )oS'~(.,7 , II ,~J·:',(.-t " ----.f'· D;~A¡:T ---r--- SLC -cÖi\iFtR: -¡:ïŒ;'---- ---------- Dear Sir: \. ".}~.M"-'.¡C:I;.~U!.!:I!'~ Re: Operational Necessity Flaring Granite Point Field, Conservation Order No. 102-E Middle Ground Shoal, Conservation Order No. 105-C (,/ Pursuant with the provisions of Rule 4 of Conservation Orders 105-C and 102-E, dated January 28, 1974, Amoco Production Company respectfully requests Committee Approval for the flaring of casinghead gas from our Granite Point Platforms Anna and Bruce, Middle Ground Shoal Platform Baker a.nd South Middle Ground Shoal Platform Dillon. On May 2, 1977, we notified your office that due to Collier Carbon and Chemical's annual "turnaround" we have an excessive flare at our East Forelands Delivery Facility. We have been advised by Collier that the "turnaround" would extend to at least May 21, 1977, and possibly beyond. We request administrative approval for the excessive flare until such time that we are able to ship gas to Collier. Since May 5, 1977, we have had e:xcessive flare on Platforms Baker and Dillon due to an obstruction that has plugged the gas line between Dillon and our onshore facility. At this time, we have not determined the cause of the plugged line, but G.re making every effort to clear the line. Again, we request administrative approval for the excessive flare on the platforms until the gas line has been cleared. Very truly yours, ¿dL/~4--' L. A. Darsow Area Superintendent .,.; " cc: V. J. Sheppard - Kenai ~. . . U.'·,.-:<,,: I.. :.1~) r: #15 ~ {?::""' ,,,' 1:11, k'\ \~y VI II \ ,'<:;" 1/1,"",1 "'~:: f! ( "\ r',~N ,)' ~, Ù' l , o SHELL Oil COMPANY 6 0 1 W. 5T H A V E N U E. 5 U I T E 8 1 0 A N C H 0 RAG E. A LAS K A 9 9 5 0 1 ~l/~~ .<,:>",.....--- January 28, 1977 ,.\,/-( ,I,. ,(. ) /~\ OJ {' Ii l\ "r ;' i~,~ L) \ ('; v ~ ¡" 'I /' L" state of Alaska Department of Natural Resources Division of Oil and Gas Alaska Oil and Gas Conservation Committee 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT CONSERVATION ORDER NO. l05-C As per Conservation Order No. l05-C, we request your permission to exceed the 15 day calendar quarter per platform gas flaring ruling. The York compressor on Platform "A" shut down December 6, 1976, due to a mechanical failure. Repair time is estimated to be approximately another 6 weeks. \ ~ \,l ' ,,,. Very truly yours, H. M. Mathiesen Division Production Superintendent Alaska Operations HMM/rrp RECEIVED JAN 3 t 1977 Divi~n " o;J Ii hs g"tM~t'VCttfOA --. #14 \\ ) ) Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 File: LAD-078-960.4 '''-'~',,-:1 I DIR ! .....~ I ~\ ¡ë"" G ~,'.~ I !(j1f...-1 '_.L.è'- E;J~,·t·rtfì'·", _____1...__: '" ,[:~::~._,IH-J --H ;~:~. ~~I\ ''''-'r v ..,7 r' ~,~ ',..·.."""1' -.-., ,," ¡....ðJ j .) ¡-,·¡\::,...7 ~V I 1 crOt îK. /2 (;':CL I L ,.._,. 3 C:'C>LI m, '. ..==I=·~.~ (v ".'.1'-'-' r DRAFT" r- ,..__I., _._":·.s~~·'-T-- CONFER: -- FTLË~---- 11.,/1' January 24, 1977 Mr. Hoyle H. Hamilton, Director Division of Oil and Gas Conservation Department of Natural Resources 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Re: Quarterly Report of Gas Flared or Vented in Excess of Volume Required for Safety ....."...' ':,::"."~""...~,,~.,, In compliance with State of Alaska, Conservation Order No(..,~~5-C ;"~~', garding the Middle Ground Shoal Field and Conservation Order''''Nö'~''''102~E regarding the Granite Point Field, we are submitting the Fourth Quarter 1976 report of gas flared or vented in excess of volume required for safety. The attached sheet sets forth the information required by Rule No. 5 of the above conservation orders. Very truly yours, ,:// /Í ~~&--'4r--- /, i L .. ( ,}..........J,;.. Ii t· L. A. Darsow Area Superintendent Attachment RECEIVED JAN a 51977 DivisiOf1 of Qil and Gas (;onsirvatlon AnëhRfRQ' #13 ) ) '\. EXCESSIVE GAS TO FLARE MONTH October 1976 COMMENCED (DATE/TIME) October 27,1976 (intermittent since then) NATURE OF PROBLEM dehydrator problem SYSTEM FLARING Platform Dillon STATE NOTIFIED (DATE/TIME) 8:45 a.m., October 29, 1976 PARTY NOTIFIED Harry Kugler COMMENTS RECEIVED JAN a 5 1Ð17 *STATUS AS OF LAST DAY OF MONTH Dlvlalon gf 011 am! 669 QanÀ9fVation Aneharüg8 TERMINATED (DATE/TIME) 12:00 noon, November 17, 1976 STATE NOTIFIED OF TERMINATION (DATE/TIME) 9:30 a.m., November 18, 1976 PARTY NOTIFIED Lonnie Smith *Systems that are continuing to flare at end of month will be carried forward and termination will be reported on subsequent reports. #12 February 17, 1976 ~"" if',..,"J,,··' . '¡ ~!.:,: . 't DlR I 30<'" :::' ~,I .,~ ~' ..~:....". .. : ",'\,',:" ""ft:¡:;.¡j-,.~, ,~-::I \o:I'~",~, '''''.'''\,';~,i C'":", E...'~ ......., ¡ " ,,:""t'" . NG ,-- ,.~.,.... ~" .,J' ENÇ"'¡-- ;.it~' fN(J....J..-? íl";~-i;¡",":' ( . , '¡',', .,', ,',,',_ ,..",3,_.,,~'<=~_. ,·','·,,1, " ! ~. ..... 4~·-{..".. : '. I .SENQ J'"'' . ',. ' GfÒll ...< , '. ~ GfOL ,.... .__J.,3. ~f~, , :-1 ,~~ I"" ..T ~, ' "F,' --·f·','-..; ..... --..,.""-..., ' , ¡j h'i'........ '" j~~ '..c """.....-.' ._~ONFP;f·..~--, I.tf!lE~Cð ----,.' ". .~. "o~~ê . c<') I 0 ~, . .. '-7, .... (. o SHEll Oil COMPANY 6 0 1 W. 5T H A V E N U E. 5 U I T E 8 1 0 A N C H 0 RAG E. A LAS K A 9 9 5 0 1 State of Alaska Department of Natural Resourc.es Mr. Thomas R. Marshall, Jr. Executive Secretary Alaska Oil and Gas Conservation Committee 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Marshall, We give the following explanation for the lengthy shut down of the sales gas compressor on Shell's Platform "C", Middle Ground Shoal. The York sales gas compressor was shut down on October 28, 1975, due to a failure of the balance piston seal. Upon opening up the case of the compressor, it was discovered that extensive damage had been done to the entire rotor assembly. On the advise of the York service manager, the entire rotor assembly was removed and shipped back to the York factory in York, Pennsylvania, for repair. This was done on October 30. We received the repaired rotor back at the platform on December 16, 1975. The final shipment of parts to complete the repair was delayed at least two weeks because the York factory shut down for the Christmas holdiays from December 23 to January 4, 1976. We received the final ship- ment of parts on February 6. A York representative was brought on board and the reassembly of the compressor was started on February 7, 1976. The assembly continued until its completion on February 14, 1976. Test runs and adjustments were made and the sales gas compressor was back in operation on February 15, 1976. If I can provide any further information, please advise. Yours very truly, ~w.~~ \ 'I .; ~ : \." .,,:' .'., ~ \ \' '\ ~ ..J~\, \...., ¡\ 1 ~, ;. ~ ~ K. W. LaGrone Production Superintendent \' I:' (:\ "I 9 Dî\r;~,\ ()H OF Oli, .>..NCH()'~· \..~,..~ ~.<I c.- ~ ,') #11 ( {,i ("'I,,i!: ·(~~LII.I'II'W'" I D1R T~"" ;--¡-C~""G EOL 11V1/\ '\-rë~"H',!G \ "._-, ---'.'.': "'1'---·' ,U 1.r·NG,_.__.., i' 12-·:>.JC \ !: =-1_~: ~;'iÒ."'r--· I, I .'\ ':\!8 Iì.___ j' I 5 rNG ;~I"rc::c~ , I '-'1 2 C'~(X'I--'J ; r-í:~GFO!~-I-- ¡': :--- [~.~- ~ ~~., ·:.~_..I---: e,' I DFU\FT I f;--I--'- ·si:c--l--"! ~:L-.- ". '-, ~ k'~ CONFtR: ¡ ¡,~i~,~0,,' f;l{--'(;:--O IOC''''': ." ",IT~ ,.. I .-rl ~. o SHELL OIL COMPANY 6 0 1 W. 5T H A V E N U E, SUI T E 8 1 0 A N C H 0 RAG E. A LAS K A 9 9 5 0 1 January 30, 1976 state of Alaska Department of Natural Resources Division of Oil and Gas Alaska Oil and Gas Conservation Attention Mr. T. Marshall 3001 Porcupine Drive Anchorage, Alaska 99501 <,,/'" ".':7 ,...... "- I \0 b"- ~1'1\ a \ '1 Y r··· 'If ~'j~::/-- ~ j ~'\ l . .....L... i' "--¡;J- !~___..k·.pr-"7t>>:f- _ ,,_~.,_Jl'·-C~1~íl- ~ "---·,·--·"·~:ir·~ r.11', '~= ,',1-" __"._,:_,..;::....~, i :'-(j-)"':¡ " 4t.; : ' ,....-"'-1.'%1 V" (j , , ,·ø-<"' l,~....:¡:\1~· Ç.(; v· II (,. In compliance with Conservation Order No. 105-C, we are again requesting your permission to continue flaring the excess gas from Platform "c" until the sales gas compressor is repaired. Committee CONSERVATION ORDER NO. l05-C The York compressor plant shut down over the Christmas holidays and rescheduled parts of the equipment that we needed for a plant completion date of January 30, 1976. Repair time is now estimated to be about March 1, 1976, considering shipping schedules and arranging for a factory representative to be on location during the repair and start-up. Yours very truly, -¡(u/, ~~ K. W. LaGrone Production Superintendent \ ". \ .'; l>J l,~.!, ;¡ , ~ : ,,'71 :'. t , : I ~:; " "" . C) ~\ ;' ':~'~ 1'': () ; '.. . ,i\.:" ,:" .-:: 1;' .. .:..' ': #10 " o SHEll Oil COMPANY ":"~_'__"'--'-~"".J" \ \ ~~:\J \ ;:'.--( 'c: '!';~'.:¡,~~¡~:" C·,·.":>,' 1-,-,·,"1",..',"',·, ,..., ",',', ",',"'> "f'fJ,"', r-I·~··:::;~/ í"1 ."'" ."\" i-j ~:~"I:':::" "r,::,,-tfl\f'\ "" ..".:, " ~.~ ,~..... --ô'f . \ ~¡LI ",' ,,\,,_,_~ "\ ""lit >t('i J "....J "'1"~, ,,\,'" \":" ----I''~ :;. C F.nLt..K':. ~--\'''0 "', :1"," I:: (~.'L , ,\, /, " , .. I.. \...> '~" ·'.,l k:' ',' E=t_~(,;;;L_\\::1 W (I \'." '" 'f' i.:i::~":'~_~.:..:~.,'~·;,;·;~·:Ç2ji!~.' 4 þ pItt, --k v I () 6 - C I (J 6 0 1 W. 5T H A V E N U E, 5 U I T E 8 1 O· A N C H 0 RAG E. A LAS K A 9 9 5 0 1 November 17, 1975 State of Alaska Department of Natural Resources Division of Oil and Gas Alaska Oil and Gas Conservation Attention Mr. T. Marshall 3001 Porcupine Drive Anchorage, Alaska 99501 Committee SUBJECT CONSERVATION ORDER NO. 105-C As per Conservation Order No. 105-C, we request your permission to exceed the 15 day per calendar quarter per platform gas flaring ruling. I The York compressor on Platform "c" shut down on October 28, 1975, due to a mechanical failure. Repair time is estimated to be approximately 2 months. c.:-~,~ --0W~~~ f:\i/"··"tr'\I'\ ' ~ J. H. DOUGLAS for K. W. LaGrone Production Superintendent --,.....-....~.-.~....... #9 I. .T~ AMOCO ~I~ r;,,¡l,/,' t ~". 1(, o.Ç' Co, \ ,,~ ':,1, I .",~ ',,,,' '" r ',:,,(~,'~ )1 ,~ I 0 5 - C, 1- ~p .. ,"'þ I;' 4! ICe Ie",' ,1 I ¡ {,..';;,i_ I ') F"Q¡~r'~:> " l ¡,....'\ i ,"\¡ r1 I,.'"" .. ( Amoco Production Company P.O. Box 779 Anchorage. Alaska 99510 t ~~T~'-::-II~ I ~(;~ t~I~,'~il t. _I : f .. ..' I " ,-1'- 'I ·,~:r 1'·..,-." I ;¡ I . r" ~¡i ')\(J , r"·--'~ ; L¥ ".,' ;"····'1 j I - ,,'("-1 i:;.{~~~E ~·'¡""!"'\~'.oII.''''''~'''''~'''~ ~~(~'I' - '. ~ ' -" ",.:~".", '.I¡",r~~.\...~· .,......,.....,"',...........- .....\ G. J. Ross Area Superintendent September 16, 1975 File: GJR-772-986.5ll j ~ -1 Mr. Thomas R. Marshall Executive Secretary Alaska Oil and Gas Conservation Committee Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: I ~ t fA IA /~ p P ,\ " . '3 .. 105- <.. \-(;v' Re: Gas Flaring MGS Platform Baker Pursuant with provisions of your administrative approval No. 105-C.2 dated July 15, 1975, Amoco Production Company has been granted approval to flare casinghead gas in excess of the amount required for safety purposes until October 1, 1975 or until our compressor installation is completed, whichever occurs first. Please be advised that we now anti- cipate compressor installation will not be completed by October 1, and we subsequently request Committee approval for the flaring of all casinghead gas through October 31, 1975. .. - Ii,. \-- -Þ~"-'';;,.I'JI'.11~~ Following receipt of administrative approval No. 105-C.2, Amoco began the removal of the SLHC Worthington compressor in anticipation of the delivery of the new Ell compressor package. The Ell compressor packél,ge was damaged, and repaired intrans~t" and exper·ienèéd..··'s·èVërär···šF1I'ppIng"'" ..''''''''''-.,,. 'èreiay~-';"hich-~rësüited"--i~"'itš"'ãr'rivã'l in Anchorage on September 2. Its movement to the platform was then further delayed by inclement weather which prevented the operation of the derrick barge. Due to the weight of the compressors, the barge was necessary for both the removal of the t'"':".. ;::1 : .':'1 ,u~ C' ? i '/ ' " 'I) ) ) - 2 - old Worthington compressor and the installation of the new Ell compressor package. This transfer was completed on September 13, however, and installation of the new compressor is now being expedited. Due to these delays, we now believe that the installation will not be complete by October 1. For these reasons we respectfully request Committee approval for the flaring of all casinghead gas from MGS Platform Baker through October 31, 1975 or until the compressor installation is completed, whichever occurs first. Very truly yours, j~"-~-~ George J. Ross Area Superintendent '-'··-1 ," I, i -¡ r-¡ , . #8 ,..--' .-1'/ 7 II C:;~' " '1~ ,;r~ (,;;¡: / /""~:...(..,,,d&!..." " h ')\;;' .¥JJ OIL D!b ht/~'//) tv Ii ?lr;¿ C41~5' C;;¡J!t? Ic) 2-. l~'6 r;;¡r ?¡ //~ 52)' ç (/JCO) o?~ÇD r/1k¡; / I í' ìS'· ( ) ¡I ;2/r- /), ¿' J r FIr'- L¿'?ttøc¿..¢,(.·¿~ '/:.'/7'!-ð/l ,~ ;' ?h:~ Ú;4?">~f¿' ,/~,~;;",r.~,.4:', <~,~, l / "ìJ' >0 I¡ It) 2- / ,:.)" 7S/ l.;:í.ji~.1 C:, '~l / (ÆP6) /d? 3b /'1'6 /3,'>2- G r ~-J If ¿¡-t? 3,30 c. '1' 2- :1?l7 :'} )3 C IJ) (;,33 5"7 JI)/ !::J-.) 2- ~~' t.: ' 7 (/3 (0) 13 7 2:2'} I/f 8'(r¿ /P? (¿rb) 3/1 -.' ?Jl ~'";;y ¡3J .. (13cD) 72Ç- 1/7 ¡¿)Ù ¿./'7" r- ¿~r {jpb) -£.to/' :; 71"' ;.? jt) q'~J i / ë)--c,' ) \. l /(,/2- 0~/ "2~ ;::""j,t. f I( /3 :>¡ /1 £/"6' ) I.) ttb , /u2.- ~~C~ r¿~, '~ ,/ I ,/ /) !J'2,¡ 0 S·',s 'b ¿/LrY' ~ /t.'" ." ....' it r /3 ~'/j(;, } [;.J~" / ,.;?t'I'''' I /3)5; /"'7 z..- ','~ . / ?'J 51.) " , /2.5) )J 2.- ./ ¿/r.!') ,'-;;::jn' OJ';' J. ~ ;,S ;¡. '/J4.,t.. . ;~,¿""'¿~.. .",~'~7'-' ,:<;~ ~.,'~¿#' "¡,~ /' ,(',!,e.-.,r ""(:~:::;.ø~; ." 'ë:'Ú~ -/c~/¿;' 7â,,¿,,.r ,-.,.t-':'~ r' ,A-~. 4.\d e.. I (:) S- - c.... .-.- /' 7 / Ó" "" - ( . , , ,./ ' ..i!.~ , ,-- ",.,,,,"--- " 7 ¡íVI.I):) ~/~.,., ",,' ,." '''''2/' ./.. (Í ,..:.~' #7 ,>If( "'s " \ \iJ \ \ \ Q"" \\ " ') ! ~t)) <; - (.1-- (\ I ¿"-ö v' f-\~Û1 V," I. ~T~ AMOCO ~11IIIJP!í Amoco Production Company P.O. Box 779 Anchorage, Alaska 99510 G. J. Ross Area Superintendent .- .. l'i,T;1 'f ....(.... f'~i~ 'Vi ~ ,f, ,) ¡ ,<, ( '~i (.",'1 t\','1 ß' \/1' I ,;> - .,t "f <\'" \,i)' ' O.é I" I \- ""i:>iìt' '".'" 'j'âØ I c. 'GtÔC"- : ¡ ~~~f~ I 2 ENG-r- i}Ö,iG",- ---'-"4 cÌ'~G-'! ----, "---I" 5 F ,'--lG 1- -'-'-"1' GCOL ,..-. I ' :' ? Gr:CL r--- ---I 3 GCOL ,'- \,-_... . J , REV r- ~'---r··ÓRÀf:T--T- 1___...,_" ".____ ¡ ",I "" SEC I !~'~_~~F'ER: _ J FILE: / C) s- - '-- W\¡,.'\ It ~ J. 0/1' ¿ ~.,.¡ "-. ('(;/' ¡,,¡ .çd,/' lG I..... I (..;:¡, July 1, 1975 I ((,/11 } File: GJR-567-986.51Ì Mr. Thomas R. Marshall, Executive Secretary Alaska Oil and Gas Conservation CommitteèJ Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Sir: Re: Gas Flaring Middle Ground Shoal Platform Baker Pursuant with the provisions of Rule 4 of Conservation Order No. l05-C dated January 28, 1974, Amoco Production Company respectfully requests Committee approval for the flaring of all casinghead gas from MGS Plat- form Baker for the period Ju:J:y}5,~975 through October 1, 1975. This is required as an operationalnecess"i'ty in order·..·t:õ--r-ëpiãëë--ì:1ïë-Platform Baker gas compressor. We estimate that approximately 1.8 MMCFD of gas will be flared during this construction period. Amoco is currently preparing for the replacement of the platform gas compressor as it is no longer well-suited to platform operating condi- tions. The SLHC Worthington compressor was initially installed to provide high pressure gas for artificially lifting the producing wells by gas lift. Later in the life of the field, a slip stream was taken off the compressor discharge for high pressure fuel gas and for the sale of casinghead gas. We have now converted all producing wells to Kobe lift and have eliminated gas lift operations. Consequently, the exist- ing equipment is not properly sized to continue as a fuel and sales gas compressor. We are therefore replacing the Worthington equipment with an Ell compressor package which is better suited for current platform requirements. ~Œ©[U~!~J ..jW- Oa. Iq 15 OtY'lSfðlÙor ()/k,)i',N!) GAS t,; Cnl.)Rt-. (,E t" ~ ) ') - 2 - We now expect delivery of the Ell compressor in Alaska in late July. Consequently, we are requesting the authority to begin flaring all produced gas to allow the disassembly of the Worthington compressor to begin. We estimate that one month or more may be required to disassemble the compressor house, compressor, cooler, etc., for removal from the platform. This will be an extremely time-consuming task due to the physical size of equipment involved and the extensive degree of dis- assembly necessary to remove the equipment from the platform. Following removal of the compressor and associated equipment, we plan to proceed as rapidly as practical to complete the installation of the new compressor. Although we anticipate no major problems in this phase of the construction, we have allowed approximately a month for the installa- tion. We believe that these time requirements are realistic estimates for our planned construction and we respectfully request your approval to proceed. Yours very truly, ~~, ~-J- George J. Ross Area Superintendent #6 \ ' j :t'ill t , It/)¡;·I'¡,?ji;' : 7"" i ~' /¿',I,..,/V , 'I,' ð l ,.'1 ,), i'l,} , .,.t..# --:'/,' ,,;.1 f ;p,t"l (~" ' f /pfJlit''¡¡' -' ,.-..¡p.,t,.¢~rl! /> / dUl, ---¡:ø,'rk, [. -' / ;¡L(l1'& I -I ~'j,-J1 I /1~líll/4/ / ç"~JP" f-~¡þ, frll.t/ , . J/7-!74f . vr I 4:; /{,/¡,,/j'" ..r l '1'1- /fI ,t:/;,;J¡J ~ -() (; - " ,4~¡æ".. &.h: / , I/(l~ IJr...JI ¡t(i.A /¡l¡f/ ) Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 November 27, 1974 Mr. Thomas R. Marshall Executive Secretary Alaska Oil and Gas Conservation Connnittee Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 A-A jo5-C./ ., ..;~ \ ~-;'-l~'] J, .--\'C. " ',"" \~~ ·"·..1 c. :. t·j,,·! @~ ''':r 1·.\, ..~!. 1 ') J_.._q~ I:: ,1""'1 I .^ ¡-i·V·;\ ~'··-r:5f~:¡c 'I"'··', ! ' .-: i')! \ ... "'. I . I (.,: ',,',', -", ,,,..... :\ :/·cr-()l\ ~ I '~G¡:OL r···~ ·,,',··········\1 'REV, __..t...J DR;~f:T \ \ S~~_.~=J=~ C()t'~FER; ji£,_-ç~-I.~~S<~,{~- File: GJR-841-986.51l Dear Sir: Re: Gas Flaring Middle Ground Shoal Platform Baker This will refer to your November 26 telephone conversation with our Mr. Barrett relating to the status of compressor repairs on MGS Plat- form Baker. We currently estimate that the compressor repairs should be completed on or before December 3. The repair parts have been located and are currently in transit to Alaska. Delivery is expected about November 29. We now estimate that we have exceeded the 700 MCFD maximum safety flare thirteen days during the period October 25 through November 26. Pursuant to the provisions of Rule 4 of Conservation Order 105-C dated January 28, 1974, we respectfully request Conservation Committee approval to continue exceeding the 700 MCFD safety flare volume until the com- pressor repairs are complete. Yours very truly, 9tt 17 ) 1,/,11 I /~ , ",,' r-,~L-<'(.I C')· ..4¿_!,¿Lu:..J..,"!-'~,' , ,: I, ~~: l. John C. S chi11eref f -, Supervisor in Charge ~"."D, Œ@Œ"" ,~ W,lE]ì .'J\\ W , f'~ OV I: 9 i974 ,- ~".. ~ "'''Ht :¡j n.:' {t! :1 i\ \FÌ\ ü~\',: i~,f:;fl~ u~' tdL t:¡.WJ ~. - -'\!;;¡r¡I.F~i) ~{'~' l:;'.~ìA'.J:.I__\n:.. GAS #5 t ') ) (}'Í: ,.7 ~,. f'\, /~ Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 November 7, 1974 File: GJR-795-986.5l1 \.' l' /.Q..., ~ (O S-- L Mr. Thomas R. Marshall Executive Secretary Alaska Oil and Gas Conservation Committee Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Gas Flaring A:ù .,I,1t ..' \,.1" 17 » ,/2 .1 l,... , ,,,¡\. Q....." .. \..9 (1'1 . (¡ \; l' ~ ý ¿"- V 7 ~\\ k "\ , 1'.1) <,!:, S j \ 12..'-' -- A ,~' . ,~'",.... ,¿. -r ¿'~, ,t, "\ \ ' I .::> "10 ~ I'j'-" ~ . r ¡ ~v ~u~. .,\ ,~... ,ì vC ") ,.)-1' ..\- ¡¡C---' OL ~ ,11\ ~ <;.0 \.'" ",' \zl/ ") '0 0 c '-' \--\ 0/.. ?\ v0 ..¡ l ~I¡ c't, \--'¿" '{'fI"'"'.1 /)¥( IV 1. CO ,,)1'1 Dear Sir: ,{ '1'1 e Pursuant to provisions of Rule 4 of Conservation Order 105-C dated January 28, 1974, Amoco Production Company respectfully requests Committee approval to flare produced natural gas in excess of volumes normally required for safety purposes from our Middle Ground Shoal Platform Baker. On the afternoon of October 25, 1974, a crack was discovered in one of the high pressure cylinders of the MGS Platform Baker gas compressor. The compressor was immediately shut down as a safety measure. As a consequence to the compressor shut-down, casinghead gas sales have been discontinued and the platform gas lift system is inoperative. We are continuing to burn casinghead gas as platform fuel gas with the excess gas being burned with the safety flare. This is periodically resulting in the platform flare exceeding the 700 MCFD permitted as a safety flare. Daily gas flaring has varied between 650 and 800 MCFD since the compressor was shut down, depending upon daily production, well downtime and fuel gas consumption. j]IE(GIEOWIE NOV 0 8 1914 !OJ DIVISiON o~ ANC¡¡O%~~EAND GAS ,) ) - 2 - We have now determined that a replacement compressor cylinder is not readily available in Alaska or the "Lower 48." Consequently, we have transported the damaged cylinder to Seattle for repair. We plan to repair the cracked cylinder with a root welding process. We estimate that the compressor should be returned to operation on or before November 15. We respectfully request Conservation Committee approval to continue exceeding the 700 MCFD safety flare volume until the com- pressor repairs are complete. Yours very truly, ~(1 -"- ~ ".~ ~ ¿; ~. George J. Ross Area Superintendent #4 ,,-,. ~ NOTICE OF PUBLIC HEARING STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL AND GAS Alaska Oi I and Gas Conservation Committee Conservation Fi Ie No. l05-C Re: Middle Ground Shoal Oi I Field Amoco Production Company and She I I Oi I Company, Operators Notice is hereby given that an application was received from Amoco Production Company on August I, 1973, and Shel I Oi I Company on July 31, 1973, applying for an order amending Conservation Order No. 105 to al low by administrative approval a maximum of 60 days of gas flaring or venting due to operational necessity downtime. A hearing on this matter wi I I be held in the City Counci I Chambers at the Z. J. Loussac Library, 5th Avenue and F Street, Anchorage, Alaska at 9:30 A.~~. on September I I, 1973, at which time the operator and affected and interested parties wi I I be heard. éL. If. III(,J.J¡ l. Thomas R. t-·1arsha II, Jr. Executive Secretary Alaska Oi I and Gas Conservation Committee 3001 Porcupine Drive Anchorage, Alaska 99501 Publish August 16, 1973 AFFID~VIT 5T A TE OF ALASKA, THIRD JUDICIAL DISTRICT, ss. Ma.ry:.. L. ._Sba ke.. - "," .__ m_. ..m. ~ing first duly sworn on oath deposes and says that·she------_' is the..~_~~.~_~_._º.~~.~~.. of the Anchorage News, a daily news- paper. That said newspaper has been approved as a legal news- paper by the Third Judicial Court, Anchorage, Alaska, and it is now and has been published in the English language continually 8S a daily newspaper in Anchorage, Alaska, and it is now and during all of said time was printed in an office maintained at the aforesaid place of publication of said news- paper. That the annexed is a true copy of a ....~~.~.?.~..~~~.~~.~ 8062 as it was published in regular issues (and not in supplemental form) of said newspaper for. 8 period of -.-.on-e.----- insertions, commencing on the ,--~.~___.,day of ~~~g.~.~:t;;._.._......, 19 ...7.3, and ending on the·.--1-6---. ..._.. day of of ..~?~.~~.~~.____.__..__, 11?...., both dates inclusive, and that such newspaper was regularly distributed to its subscribers dur- ing all of sa,id period. That the full amount of the fee charged for the foregoing publication is the sum of $ 10 · 00 which amount has been paid in full at the rate of 25¢ per line; Mini- mum charge $7.50. &4~.d!J¿ Subscribe~ sworn to before me this ---1-6 day of..-Allgns-t.., 73 19.._.__. ·f/ ., ... .>-.;:~<~_-i.~._/~C_. .__.. _. -~~~. - -.... - .-/:~-- .._k_·.'-::.f.:~~__ Notary Public in and f~r the State of Alaska, Third Division, Anchorage, Alaska Ar COMMISSION E~PI'ES -, ~ _..._.J!1.":d:....:.........J,/, 19/.2 OF ') PUBLICATION /"~-" .~, ',' -¡t ,I:I',~>JI.,. . .' ,'·,".\,1"l"'"'' " ~.;';:::,'~~~~,·'G,,~,\~!J.~,~'~~"IIH.. "1i~i";',"": 'ISTAi'1i~': OF~ìÞ,¡~~, ~~¡~f~;'; "",', D~p~R~e~\ Ò,F ":~'" ¡' NATURrAI:· RESOU,RCES ' , ~el"I-SION 'oF' Oil AND' G:Þ4 ~ ' , . " Allski... on ¡and, G.. , " ~;;:,.,:.I,,~my.tOa' 'Gommlftll .1':;";:~~.~ã:tiØ",iê Nct~ '1ÔJ.e ~ I¡, I,' '.1,. .\ . , I~." I. ".:i.ì)ðh,' ,hidi. >G~OU,rtd'ShO.'1 011 P¡.ld , . ,1Iþ~co' . ¡Production Gompany and ",,\~".I',' O!,I\ ~mp~ny~ Opèra,tors . : ".. Is' :h.rMly givln' tthlt In Iþo ,:,t~. ,:\11"";1 ~,a. ; r~c~Mlð '~rðm' Amoco . \ ~~efI~' I COmpll1ny I en AUIJutt 1, ,'1_~;.~,d¡:$t\;II>I:.Oþl:~ìItY ,en JulY ~ ':~I1~'·i~1'.i' '.'!ilt1y!:nt':for!I" ereIe, , ¡ le1\'I'l;eon"!!i1'I~'!t'~O~er ,~. 105' , 'tð;'·,i}Ì ',by .dijilftJ"'''',tlye ¡~rOYlI' "miet' 'ïriì!Of ':6Ô idiYI ' ðf' ,is,fl,erhtt" ar ":,1~~~:~e'..\ operl~¡o~'I: ',~lOest¡t, "I~;!o~~,t~~~,. " "" , ' ...-"., j., '\~~ri~g ,en:' '11"· matte' 'wm be' I 111~I'd,,!;,,>",t~l_ 'Cit,y ~.G~"ncil ~ C~~mbers at. tW~!,IZ; ':J',; ~11(S~1C...tlbr~l1V; ',5I1h ~enu. ,.ft¡it,,~~~;.'strllt,' A"aho~n., .~I..k.1't ,no?~~M¡,:en,¡S.p,emb'r:H', "9;73, It , 'wI'i:Î'CfJ:~t~~, '~~'·Oi'.~lto', ..nd:.ffect.cf: .~~~~~~s'f~:, ~..r.~.~:illll ~b. ·'h..M. W\·",ì¡'<,~om.."'I.,I.MI!IhIIl, .It. , i:\~;~r···'~:",,'~~eC.út¡Y'. 'Secr.et~ ' .' ,!\.,jp't:,.;~IISh" 011 ,end: Ga. ' . ;,;<,~~':,; , ,C~n'~erv,ti~n' ~~iU). , " '::·,',I,\,;,-1-3pOl·,Poreupn,.'DrIYe, ",_ "'~, :i"". Anchoril~le, ;'AlatM '99501 :p~î~,::,(ÞNÎu,lti'16" i"m,,'· ''"', : t~'~"ièt¡ ,~:. ' ·....1' . ~i.JiI... I #3 II' ) ') ,'< , , Amoco Production Company Security Life Building Denver, Colorado 80202 August 1, 1973' , (5~'f D'.~·,l.lj~ _ c. GEð~' I C:-ËNG" 'r-- I 1 r~NG .'..--- I 2 -F.NG"·-f- I 3 ENG-'l- -4 ËNó'''r'- I S"'ENG'-r- / 1 ~EOl r-- ,/--':__GEOl " 3 ~E~~"·I- REV -- DRAFT L , ~EC {~ V Co a)"'.. c.. .. CONFER: , 0, .. ~,'lE:, (O6'~ c.. - , File:: VDP-34'8~986.511 Mr. HOmer L. ' Burrell (4), Alaska Oil and Gas Conservation Gommi ttee Di vision of Oil and Gas 3001' Porcupine Drive Anchorage, Alaska 99504' , , IIl)'::1 /1 ~~G[b "If ~"r M'l l r- De ar Mr. Burrell: Subject: Application for Amendment of Alaska Conservation Order 105,' Middle Ground Sho'al Field Amoco, Operator in the subject field, on behalf of the Chakacha'tna Group respectfully' requests that the' Alaska Oil and Gas Conservation Committee hold a public hearing for the purpose of 'amending State of Alaska Conservation Order No. 105' to allow the flaring or venting during operational necessity downtime by administrative permission. Operating experience has shown that necessary maintenance situations can result in equipment downtime with the resultant gas flaring exceeding the 96 hours' maximum allowed by Conservation Order No. 105. Consequently, we request that the Committee, as a result of the herein requested hearing, grant an operator by administrative action without a hearing a maXimum of 60 days within which it may flare or vent gas because of any operational necessity ~ Such requested future flaring would be separate and apart fr'om the amount necessary for adequate safety flares and be separate and apart from theamoWlt required in emergency situations. y ~urs very"tr~lYI\ -r; 0 Y! i " A -- /,~. ~ ~. Gile We suggest that this application be heard the s'ame day that Shell's application for the same purpose at MGS and our application for the same purpose in Granite Point Field, are set for hearing, for the convenience of all parties. õ)lErßœ~WŒ~:~ Æ L A IJ ,'"'I oJ '/ ,"\ _1"1 .:-J , " ,;:..,¡ =:. d r;!V;SfC N ::' ¡: ()!L I' i'fD Gr\~ ÞJ-;CH()f~~, ~,r. .r .\..~¡ , '} File:: VDP~438:"986·.511 August 1, 1973 . Page 2 ) cc: 'Mr. K.' W . LaGrane Shell Oil Company 430' 7th 'Avenue Anchorage, Alaska 9950'1' Mr. H.' A. Slack Atlantic Richfield Company P.O. Bax 36'0 Ancharage, Alaska 99501 Mr. F. L. Franz Skelly Oil Co.mpany 1088 Lincaln TawerBuilding Denver, Colarada 80203" Mr. J. P. Denny Phillips PetraleUm Campany 130'0' Security Life Building Denver, Colarada 80202 , Mr. J.W. Wa1ker Standard Oil Campany of Califarnia P.O. Box 7~839' Ancharage,Alaska 99501 Mr. W. M. Janes AmacaPraduction Campany P . . O. B ax 779 Ancharage, Alaska 99501 , Mr. H. O. Hickman Amaca Praductian Camp any Security Life Building Denver, Calarada 80202 Mr. Ralph G. Crews First Natianal Building 425 "G" Street Ancharage, Alaska 99501 ~ [ (:::'\ I? ~ W æ --~ ~ ,¡.J I~J ¡ C 1 ' . t; l0 ~ . è:_: f: . J '"\."" í ,,~, . 0..=) . " . J ..' , ,j A~ !1 ..:., ...,1,) D¡V!':I":~ r¡ C:· ¡: ("iI l ¡\:n , '..- ~ ... r' Ar ~ C h () f{ /, G i: G,.',') #2 " \. i ) , ~/;r~ Oil COMPANY (1} SHEll 430 7TH AVENUE ANCHORAGE, ALASKA 99501 July 31, 1973 Mr. Homer L. Burrell Alaska Oil and Gas Conservation Committee Division of Oil and Gas ¡~~~o~~;:~P1~:s:iV~9504 Å-f@ lICe! ¡to "I fõ v Subject: Alaska Conservation Order No. 105 Middle Ground Shoal Field Dear Mr. Burrell: , ï D R 2/".";" --I ~~,'Gf:tt¡{; I c. ENG '/'1 ENG ' =r2£NG --=13;,::~ -__J 5 EN,~: I /"' J"'G:-'~."\:' ,....../.2 GCOL , :__[~.GEOL I ~ __L_.REV I L_:L~RAFT I' ,/, : CJÑF~~~-'···' L~~'_~ :FrŒ~;-7õ-~ I OS·' ~. 'C-, Shell Oil Company, an operator in the subject field, hereby requests on behalf of itself and the Companies shown below, that the Alaska Oil and Gas Conservation Committee hold a public hearing for the purpose of amending State of Alaska Conservation Order No. 105 to allow gas flaring or venting during operational necessity downtime by adminis- trative permission. We suggest that this hearing be held on SeptembC=E_~.J.~.._,_,.....,,". 1973. ~'>J"J U i 7.3 q./( Recent operating experience has shown that necessary maintenance situations can result in equipment downtime with resultant gas flaring exceeding the 96 hours maximum allowed by Conservation Order No. 105. Therefore, we request that the Committee be allowed by administrative action without hearing to grant an operator a maximum of 60 days within which it may flare or vent gas because of any operational necessity. All working interest owners in the leases subject to Conserva- tion Order No. 105 have authorized us to make this request and to proceed .. as indicated herein. Yours very truly, ..p' tJ K. lit). d-«. Jj~ ill r.:i {;:) ß~ J ~J~ ~ ,-, ......., I:..} i~.J .. j i ~ \ ,r l~::\ b ,_1 l' , t::"J , ì N .. .,;) . ", þ-;!. .,' t,Ui1 :,.\ 1 '7~ ' K. W. LaGrone Division Superintendent West Coast Division KWL:rp ~;r;,:~\ .,\, '.!' ,:,.Y. i ;-;) ß}.'~ þ,f ;CH()R¡:\(;¡~: #1 ,-. ~-, ~ ) r ) \ I ,. ~T~ AMOCO ~I~ Amoco Production Company P. O. Box 779 Anchorage, Alaska 99510 ( Û 16 'L- Iii II' July 5, 1973 File: WMJ-369-986.5ll {Üf "i ! ( 0 I OrR I I C.__?Eol JU., I C. ENG , -Tf"ENG I 2 --ËN"G '--r'-~--Ët~G I ---r-4'E'¡'~Ki'l - ,'... r--s'''ËNêf-r --f-f-'GEðl ......1"·2·' GEc5l, '''T-3 'GEófT- t U4 tv c¡ twe '1 ~--r-=-R~! I I, 0" J e. v s ,__-'~_~~"~~~ / ' I SEcT; "J J(J liS' 7 3 ,~,~?NFËR: : , FilE: Mr. Homer L. Burrell, Director Division of Oil and Gas Department of Natural Resources State of Alaska 3001 Porcupine Drive Anchorage, Alaska 99504 Dear Sir: Arpl, f-<'~ tH1. +,v Re: Emergency Flaring of Excess Gas We have confirmed with Collier Carbon and Chemical Corporation that their Kenai plant is shut down as a result of a fire and explosion of undisclosed nature. Repairs are underway and a plant turnaround is in progress in con- junction with the accident. Collier anticipates having the plant in opera- tion July 14, 1973. Repairs to the equipment involved in the explosion will not be finalized until that date at the earliest according to Collier's rep- resentative. In accordance with Alaska Oil and Gas Conservation Regulations, Section 2012, 1969, Amoco Production Company and Shell Oil Company respectfully request that the Alaska Oil and Gas Conservation Committee issue an emergency order for 15 days to allow the flaring of the excess gas at the joint Amoco and Shell shore facilities in a quantity equal to that which would have normally been delivered to the Collier plant as sales gas. Should this emergency situation be corrected and normal gas sales to Collier resumed prior to ex- piration of the emergency order, we will notify you immediately. Yours very truly, ·~tftvu ß .~J~ vJohn C. Schillereff Supervisor in Charge Amoco Production Company _/~/ ð;L/ ~ /. {A.__/, c7Žéi- ~/\j/2A'rt-l- K. W. LaGrone Division Superintendent Shell Oil Company Ÿi Œ © ~ ~ W Œl JUL 5 1973 DIV\SlGN \..iF OIL AND GAS ANCHORAGE