Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-211 e e Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ Q""3 - ~! l Well History File Identifier Production Scanning Stage 1 Page Count from Scanned File: ~ ::J- (Count does ;nclud~ve' sheet) Page Count Matches Number in Scanning Preparation: V YES C. Maria ) Date: 3 J 3/ oh If NO in stage 1, page(s) discrepancies were found: Organizing (done) o Two-sided 1111111111111111111 REJCAN ¢ Color Items: o Greyscale Items: DI~AL DATA p(Oiskettes, No. d- O Other, NolType: o Poor Quality Originals: o Other: NOTES: BY: ~ oaten/ólo~ oateÒ!3!ob ~ X 30 = btJ oate?J/of oh Project Proofing BY: (Maria J Scanning Preparation BY: ~ , BY: Stage 1 BY: Maria Date: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: Comments about this file: o Rescan Needed III 1111111111111111 OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) o Logs of various kinds: o Other:: mP III 111111111111111I /s/ V»P /s/ + I = TOTAL PAGES ~ I (Count does not include cover sheet) VV\ P /s/ I I t III 1111111111111111 /s/ NO Wt(J YES NO /s/ III 11111111I1111111 III 1111111111111111 /s/ Quality Checked "' 111111111 111111I 10/6/2005 Well History File Cover Page.doc STATE OF ALASKA AASKA OIL AND GAS CONSERVATION CISSION REPORT OF SUNDRY WELL OPERATIONS u 1. Operations Performed: ❑ Abandon ❑ Repair Well ❑ Plug Perforations ❑ Perforate ❑ Re -Enter Suspended Well ❑ Alter Casing • ® Pull Tubing ❑ Stimulate - Frac ❑ Waiver • ® Other El Change Approved Program ❑ Operation Shutdown El Stimulate - Other El Time Extension Change Out ESP 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ' ❑ Exploratory ❑ Stratigraphic 203 411 • 3. Address: []'Development ❑ Service 6. API Numbe P.O. Box 196612, Anchorage, Alaska 99519 - 6612 50. 029 - 23189 - 60 - 00 • 7. Property Designation (Lease Number): 8. Well Name and Number: ADL 025518 MPG -16L1 , 9. Logs (list logs and submit electronic and printed data per 20AAC25.071): 10. Field / Pool(s): Milne Point Unit / Schrader Bluff • 11. Present well condition summary: Total depth: measured 10030' feet • Plugs:(measured) None feet true vertical 4401' feet Junk: (measured) None feet Effective depth: measured 10030' feet Packer: (measured) None feet true vertical 4401' feet Packer: (true vertical) None feet Casing Length Size MD TVD Burst Collapse Structural Conductor 86' 20" 34' - 120' 34' - 120' Surface 2492' 10 -3/4" 35' - 2527' 35' - 2466' 5210 2480 Intermediate 5615' 7 -5/8" 33' - 5648' 33' - 4288' 6890 4790 Production Liner 4348' 4 - 1/2" 5643' - 9991' 4286' - 4400' 8430 7500 Perforation Depth: Measured Depth: Slotted Liner: 5711' - 9947' feet True Vertical Depth: Slotted Liner: 4302' - 4400' feet Tubing (size, grade, measured and true vertical depth): 4 - 1/2 ", 12.6# L - 5468' 4217' Packers and SSSV (type, measured and true vertical depth): None None None 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: SCANNED JUN 2 8 2013 13 Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 220 206 Subsequent to operation: 139 46 191 320 200 14. Attachments: ❑Copies of Logs and Surveys run 15. Well Class after work: • ❑ Exploratory ❑ Stratigraphic ® Development ❑ Service IN Daily Report of Well Operations 16. Well Status after work: • ® Oil ❑ Gas ❑ WDSPL El Well Schematic Diagram ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact: Sean McLaughlin, 564 -4387 N/A Email: Sean.McLaughlin @bp.com Printed N. - Joe Las Title: Drilling Technologist / Signature: IA (1 M__.-..1 Phone: 564 -4091 Date: (O f I "` /� /( Form 10-404 Revised 10/2012 j I f G/2 7 � �3 RBDMS JUN 2 6 201% "t Original t /�T %J • • North America - ALASKA - BP Page 1 Of s Operation Summary Report Common Well Name: MPG -16 AFE No Event Type: WORKOVER (WO) Start Date: 5/17/2013 I End Date: 5/22/2013 IX4- 00XMN- E:DRILL (2,090,000.00 ) Project: Milne Point Site: M Pt G Pad Rig Name /No.: DOYON 16 , Spud Date/Time: 1/21/2004 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active datum: Kelly Bushing / Rotary Table ©62.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/17/2013 04:00 - 06:00 2.00 MOB P PRE PJSM, MOVE OFF OF MPL -20 POSITION RIG ON PAD TO LAY DERRICK OVER AND WORK ON BOP STACK 06:00 - 14:00 8.00 MOB P PRE PJSM, RE- CONFIGURE BOP STACK AND LAY DERRICK OVER RIG IS ON EDGE OF L -PAD. RE- CONFIGURE BOP FROM 4- PREVENTER TO 3- PREVENTER STACK REMOVE BOP FROM CELLAR AND SECURE ON FRAME BRIDLE UP DERRICK LAY DERRICK OVER. JACK UP RIG AND GET READY TO MOVE. 14:00 - 18:00 4.00 MOB P PRE MOVE RIG OFF L -PAD, TRAVEL DOWN L -PAD ACCESS ROAD - RIGHT ON MILNE POINT ROAD, - STAGE RIG AT A -PAD ENTRANCE - TURN RIG AROUND TO BACK DOWN MILNE PT ROAD TO G -PAD ACCESS ROAD TO MAKE TURN. 18:00 - 21:30 3.50 MOB P PRE RIGHT ON G -PAD ACCESS ROAD - MOVE DOWN ACCESS ROAD TO G -PAD - POSITION RIG ON PAD TO RAISE DERRICK 21:30 - 22:30 1.00 MOB P PRE PJSM TO RAISE DERRICK - RAISE DERRICK AND PIN IN PLACE - R/U FLOOR TUGGERS AND EQUIPMENT - RAISE CATTLE CHUTE 22:30 - 00:00 1.50 MOB P PRE LAY MATS AROUND WELL STAGE WELL KILL EQUIPMENT AND TREE BEHIND WELL - BRIDLE DOWN - PLACE BOP IN CELLAR AND SECURE 5/18/2013 00:00 - 01:00 1.00 MOB P PRE PJSM, PERFORM SPCC AND EQUIPMENT CHECKS -LAY RIG MATS 01:00 - 03:00 2.00 MOB P PRE PJSM, SPOT RIG OVER WELL MPG -16 - SHIM RIG, LOWER DOORS, SECURE ALL STAIRS - SPOT CUTTINGS TANK AND FUEL TRAILER - PREP PITS TO TAKE ON FLUID - ACCEPT RIG AT 0300 HRS 03:00 - 06:00 3.00 MOB i P DECOMP RIG UP CELLAR WELL KILL MANIFOLD AND CIRCULATING LINES TO TREE AND FLOW BACK TANK R/U FLOOR MUD MANIFOLD AND EQUIPMENT - SPOT CREW TRAILER AND MUD PRODUCTS HOT SHACK - LOAD PITS WITH 120 DEGREE, 8.5 PPG SEA WATER - TEST ALL CIRCULATING LINES, 250 / 3500 PSI, 5 MIN, CHARTED 06:00 - 06:30 0.50 MOB P DECOMP RIG EVAC DRILL FOR FIRE. ALL PERSONNEL MUSTER, HEAD COUNT IS GOOD. CONDUCTAAR. Printed 6/3/2013 10:36:03AM • • North America - ALASKA - BP Page 2 of 8 Operation Summary Report , Common Well Name: MPG -16 AFE No Event Type: WORKOVER (WO) Start Date: 5/17/2013 End Date: 5/22/2013 X4- 00XMN- E:DRILL (2,090,000.00 ) Project: Milne Point Site: M Pt G Pad Rig Name /No.: DOYON 16 Spud Date/Time: 1/21/2004 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active datum: Kelly Bushing / Rotary Table @62.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 07:30 1 1.00 WHSUR P DECOMP LOAD BPV LUBRICATOR TO RIG FLOOR. PREP TO PULL BPV. _ 07:30 - 09:00 1.50 WHSUR P DECOMP PJSM THEN PRESSURE TEST BPV LUBRICATOR 250 / 3500 PSI AGAINST CLOSED SSV AND MASTER VALVE. GOOD TEST. PULL BPV THEN CLOSE MASTER AND SSV TO RE- ESTABLISH 2 BARRIERS. TUBING PRESSURE IS 150 PSI. 09:00 - 09:30 0.50 KILLW P DECOMP PJSM FOR WELL KILL. 09:30 - 11:00 1.50 KILLW P DECOMP START WELL KILL. BLEED GAS FROM IA. PRESSURE DROPS FROM 160 PSI TO 0 IN 4 !MIN. PUMP DOWN TUBING, TAKE RETURNS FROM IA. PUMP 35 BBLS AT 3 BPM DOWN TUBING. NO RETURNS WITH WIDE OPEN CHOKE, NO PRESSURE ON IA. 11:00 - 12:00 1.00 KILLW P DECOMP DISCUSS WITH ODE, DECIDE TO BULLHEAD DUE TO NO RETURNS. BULLHEAD 400 BBLS DOWN TUBING AND IA TOGETHER AT '8 BPM. SHUT DOWN AND MONITOR PRESSURE. BOTH IAAND TUBING ON A VAC WITHIN 10 MIN. 12:00 - 13:00 1.00 KILLW P ! DECOMP RIG DOWN CIRC SKID AND RIG UP HOLE FILL LINE. _ i START FILLING WELL DOWN IA. 13:00 - 15:00 2.00 WHSUR P DECOMP ' RIG UP TWC LUBRICATOR AND PT 250 / 3500 PSI. SET TWC. 15:00 - 16:30 1.50 WHSUR P DECOMP ROLLING TEST TWC FROM BELOW, 250 PSI AT 8 BPM DON IA. CONFIRM NO LEAKS ' W PAST TWC BY GAUGE ON TREE CAP. PRESUSRE TEST FROM ABOVE, 250 / 3500 PSI, GOOD. 16:30 - 17:30 1.00 WHSUR P DECOMP PJSM, N/D TREE AND ADAPTER FLANGE FMC HAND INSPECTED HANGER THREADS, 8.5 RH TURNS, 2 7/8" EUE 8RD - LOAD, STRAP AND RABBIT 4 1/2" 12.6# L -80 IBT TUBING INTO PIPE SHED - MAINTAIN CONTINUOUS HOLE FILL TO IAAT 25 BPH 8.5 PPG SEAWATER WITH NO 'RETURNS 17:30 - 21:00 3.50 BOPSUR P DECOMP N/U 3 PREVENTOR BOP STACK - INSTALL RISER AND TURNBUCKLES, MOUSE HOLE - M/U CHOKELINE AND KILL LINES TO STACK 21:00 - 22:30 1.50 BOPSUR P DECOMP ! PJSM, INSTALL BLIND SHEAR RAMS IN STACK M/U ACCUMULATOR HYD LINES TO BOP 22:30 - 23:30 1.00 BOPSUR P DECOMP R/U BOP TEST EQUPMENT AND M/U FLOOR VALVES FOR TESTING - FILL STACK AND AND CHOKE MANIFOLD Printed 6/3/2013 10:36:03AM • • North America - ALASKA - BP Page 3 of 8 Operation Summary Report Common Well Name: MPG -16 AFE No Event Type: WORKOVER (WO) Start Date: 5/17/2013 End Date: 5/22/2013 X4- 00XMN- E:DRILL (2,090,000.00 ) Project: Milne Point Site: M Pt G Pad Rig Name/No.: DOYON 16 Spud Date/Time: 1/21/2004 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active datum: Kelly Bushing / Rotary Table ©62.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) ' 23:30 - 00:00 0.50 BOPSUR D CE OMP PJSM, TEST THREE PREVENTER BOPE AND RELATED EQUIPMENT - BOP CONFIGURATION = ANNULAR, BLIND SHEAR RAMS, MUD CROSS, 2 7/8" X 5" VBR LOWER PIPE RAMS - TEST BOPE ACCORDING TO AOGCC REGULATIONS AND DOYON PROCEDURES - TEST ANNULAR WITH 2 7/8" TEST JOINT TO 250 PSI LOW, 3500 PSI HIGH, 5 MIN, CHARTED I it I I - JEFF JONES OF AOGCC WAIVED STATES RIGHT OF WITNESS TO THE BOP TEST 5/19/2013 00:00 - 04:30 4.50 BOPSUR P j DECOMP PJSM, TEST THREE PREVENTER BOPE AND RELATED EQUIPMENT - BOP CONFIGURATION = ANNULAR, BLIND SHEAR RAMS, MUD CROSS, 2 7/8" X 5" VBR LOWER PIPE RAMS - TEST BOPE ACCORDING TO AOGCC REGULATIONS AND DOYON PROCEDURES 1- TEST ANNULAR WITH 2 7/8" TEST JOINT TO 250 PSI LOW, 3500 PSI HIGH, 5 MIN, CHARTED 1- TEST LOWER 2 7/8" X 5" VARIABLE RAMS WITH 2 7/8" AND 4 1/2" TEST JOINTS, 250 PSI, 1 3500 PSI, 5 MIN, CHARTED - TEST BLIND RAMS, FLOOR VALVES, AND CHOKE MANIFOLD TO 250 PSI, 3500 PSI, 5 MIN, CHARTED - TEST WITH FRESH WATER - PERFORM ACCUMULATOR DRAW DOWN TEST - JEFF JONES OF AOGCC WAIVED STATES RIGHT OF WITNESS TO THE BOP TEST 04:30 - 07:00 2.50 BOPSUR P DECOMP R/D TEST EQUIPMENT - R/U WELL SUPPORT LUBRICATOR AND TEST 250 / 3500 PSI, 5 MIN, CHARTED - PULL TWC, TUBING IS ON A VAC. 07:00 - 08:00 1.00 PULL P DECOMP PJSM THEM MAKE UP LANDING JOINT TO HANGER. FMC BACK OUT LDS. PULL HANGER TO RIG FLOOR, 82K UP WEIGHT. (INCLUDES 40K BLOCK WEIGHT) ! CUT CABLE OFF JUST BELOW HANGER AND REMOVE CLAMP. PICKUP ANOTHER 30 FT AND RE- INSTALL CLAMP, THEN CUT ESP CABLE AGAIN JUST ABOVE THIS CLAMP. RUN BACK IN AND PLACE CLEAN PIPE ACROSS BOP STACK 08:00 - 08:30 0.50 PULL P DECOMP CLOSE ANNULAR, BULLHEAD 31 BBLS DOWN I TUBING AT 3 BPM, 140 PSI. CHECK PRESSURE UNDER ANNULAR THEN OPEN IT. MONITOR WELL. 108:30 - 11:00 2.50 PULL P DECOMP PJSM THEN HANG ESP SHEAVE AND TRUNK CONTINUE PULLING SINGLES FROM WELL. RUN CABLE UP THROUGH SHEAVE AND OUT TO SPOOLING UNIT, SECURE IT TO SHIPPING DRUM. Printed 6/3/2013 10:36:03AM • • North America - ALASKA - BP Rage 4 of 8 Operation Summary Report Common Well Name: MPG -16 AFE No Event Type: WORKOVER (WO) Start Date: 5/17/2013 End Date: 5/22/2013 'X4- OOXMN- E:DRILL (2,090,000.00 ) Project: Milne Point Site: M Pt G Pad Rig Name /No.: DOYON 16 Spud Date/Time: 1/21/2004 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active datum: Kelly Bushing / Rotary Table @62.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 11:00 - 12:00 1.00 PULL P DECOMP PULL SINGLES OUT OF WELL, L/D. INSTALL THREAD PROTECTORS ON BOTH ENDS. CONTINUE HOLE FILL AT 20 -25 BBL /HR, WELL IS NOT STAYING FULL AT THAT RATE. - POH F/ 5467' T/ 4490', PUWT = 75K, SOWT = 70K 12:00 - 12:30 0.50 PULL P DECOMP ! PERFORM SPCC AND EQUIPMENT CHECKS I- SREVICE DRAWWORKSAND RIG FLOOR EQUIPMENT 12:30 - 17:00 4.50 PULL P DECOMP POOH, 2 7/8" EUE 8RD TUBING ESP COMPLETION - F/ 4490' T/ ESP MOTOR BHA - WELL IS STILL ON A VAC 17:00 - 20:00 3.00 PULL P DECOMP MONITOR WELL BEFORE PULLING BHA TO ,SURFACE UD ESP PUMP AND MOTOR ASSY TOTALJTSL/D =171 27 /8 "EUE8RD - LASALLE CLAMPS = 92 - PROTECTOLIZERS = 5 - FLAT GUARDS = 3 20:00 - 21:30 1.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR OF ALL CENTRILIFT CLAMPS AND EQUIP R/D ESP SHEAVE AND TRUNK ASSY 21:30 - 22:30 1.00 EVAL P DECOMP !PJSM, SPOT SWS WIRELINE TRUCK - INSTALL TEST PLUG AND DUTCH RISER 22:30 - 00:00 1.50 EVAL P DECOMP MOBILIZE SWS SHEAVES AND TOOLS TO RIG FLOOR - R/U FOR FULL PRESSURE CONTROL - OA= 0 PSI - 24 HOUR FLUID LOSS = 605 BBLS, 8.5 PPG SEA WATER MAINTAIN CONTINUOUS HOLE FEED TO IA @ 25 BPH 8.5 PPG SEA WATER 5/20/2013 00:00 - 03:00 3.00 EVAL P DECOMP PERFORM SPCC AND EQUIPMENT CHECKS - PJSM WITH NEW CREW AND SWS FOR R/U OF WIRELINE TOOLS R/U FULL PRESSURE CONTROL LUBRICATOR TO DUTCH RISER - MAINTAIN CONTINUOUS HOLE FEED TO IA @ 25 BPH 8.5 PPG SEAWATER 03:00 - 03:30 0.50 EVAL P DECOMP TEST SWS LUBRICATOR AGAINST TEST PLUG, 250 / 3500 PSI, 5 MIN, CHARTED, GOOD TEST BREAK LUBRICATOR AT QUICK TEST SUB - STAND BACK LUBRICATOR 03:30 - 04:00 0.50 EVAL P DECOMP PULL DUTCH RISER AND PULL TEST PLUG - RE- INSTALL DUTCH RISER 04:00 - 06:00 2.00 EVAL P T DECOMP M/U PDS CALIPER (MEMORY) LOGGING TOOLS TO DETERMINE IF THERE IS EVIDENCE OF BUCKLING OF CASING - M/U AND TEST QUICK TEST SUB - RIH WITH PDS CALIPER AND LOG FROM 1000' TO SURFACE. 06:00 - 06:30 0.50 EVAL P DECOMP PDS DOWNLOAD AND CHECK DATA, DATA IS GOOD. NO ANOMALIES SEEN IN CALIPER LOG ON INITIAL LOOK AT DATA. — Printed 6/3/2013 10:36:03AM • • North America - ALASKA - BP • Page 5 of 8 Operation Summary Report Common Well Name: MPG -16 AFE No Event Type: WORKOVER (WO) Start Date: 5/17/2013 End Date: 5/22/2013 X4- 00XMN- E:DRILL (2,090,000.00 ) Project: Milne Point Site: M Pt G Pad Rig Name/No.: DOYON 16 Spud Date/Time: 1/21/2004 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active datum: Kelly Bushing / Rotary Table ©62.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 06:30 - 07:30 1.00 RUNCOM P RUNCMP PJSM THEN START RIG DOWN SWS !PRESSURE CONTROL EQUIPMENT AND LUBRICATORS. 07:30 - 09:30 2.00 RUNCOM P RUNCMP MOBILISE CENTERLIFT, FMC AND BAKER PERSONNEL. PREP RIG FLOOR TO RUN THROUGH TUBING ESP. CENTERLIFT SPOT SPOOLING UNIT BACK INTO POSITION AND LOAD CABLE INTO UNIT 'WHILE RIG FLOOR GETTING CLEARED. 09:30 - 12:30 3.00 RUNCOM P RUNCMP PJSM FOR M/U ESP MOTOR. PICK UP ESP MOTOR AND SERVICE ON RIG FLOOR. 12:30 - 13:30 1.00 RUNCOM , P RUNCMP PICKUP 1 JT OF 4-1/2 TUBING. MAKE UP DUMMY HANGER AND LANDING JT, LAND HANGER AND RUN IN LDS. 13:30 - 14:30 1.00 RUNCOM P RUNCMP 'LOWER IN FIRST PUMP COMPONENT. MAKEUP 2 -7/8 WORK STRING AND CEMENT LINE. 14:30 - 15:00 0.50 RUNCOM P RUNCMP PUMP OFF GS SPEAR. UNSUCCESSFUL FIRST TIME AT 1 BPM, WORKS BETTERAT2 - -i.. — BPM. 15:00 - 16:30 1.50 RUNCOM P RUNCMP RIH WITH PACKOFFASSEMBLYAND PUMP OFF. RIH WITH PACKOFF TEST ASSEMBLY AND PUMP OFF. PULL WORK STRING UP AND CLOSE BLINDS, - - -_ ATTEMPT A PT. 16:30 - 17:00 0.50 RUNCOM P RUNCMP NOTABLE TO PT WITH TEST PUMP. TRY WITH MUD PUMP, SAME RESULT. TRY JARRING DOWN AGAIN, NO SUCCESS. 17:00 - 19:00 2.00 RUNCOM N DFAL RUNCMP ' PULL TEST TOOL OUT AND PACKOFF ASSEMBLY OUT. FIND PACKOFF ASSEMBLY SLIDING SLEEVE HAS NOT SLID DOWN TO EXPAND THE SEALS. APPEARS TO BE AN INTERNAL OBSTRUCTION. GET NEW PACKOFF ASSEMBLY FROM MPU SLICKLINE SHOP. 19:00 - 20:30 1.50 RUNCOM N DFAL RUNCMP M/U AND INSTALL NEW PACK -OFF IN THRU TUBING COMPLETION ASSY - PACK -OFF PREMATURELY SET TWICE - FIRST TIME, SLIGHT HANG -UP WHILE !STABBING INTO HANGER SET THE TOOL - SECOND TIME, REASON UNKNOWN - RE -SET PACK -OFF AND RE -RUN BOTH TIMES - SET PACK-OFF ON DEPTH, SET 5K DOWN WEIGHT = GOOD SET PUMP OFF GS SPEAR AND POH 20:30 - 21:00 0.50 RUNCOM P RUNCMP RIH AND SET PACK -OFF TEST TOOL - PUMP OFF GS SPEAR AND POH - FILL STACK, CLOSE BLIND RAMS ! - TEST PACK -OFF, 250 / 1000 PSI, 5 MIN, CHARTED. GOOD TEST 21:00 - 23:00 2.00 RUNCOM P RUNCMP I RETRIEVE TEST TOOL AND INSTALL SLIP STOP ASSY WITH 5K DOWN WEIGHT - R/D 2 7/8" RUNNING TOOLS, L/D 2 7/8" PAC PIPE - CLEAR RIG FLOOR OF BAKER TOOLS Printed 6/3/2013 10:36:03AM • • North America - ALASKA - BP Page s of a Operation Summary Report Common Well Name: MPG -16 AFE No Event Type: WORKOVER ONO) Start Date: 5/17/2013 End Date: 5/22/2013 X4- 00XMN- E:DRILL (2,090,000.00 ) Project: Milne Point Site: M Pt G Pad Rig Name/No.: DOYON 16 Spud Date/Time: 1/21/2004 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active datum: Kelly Bushing / Rotary Table @62.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 RUNCOM P RUNCMP P/U LANDING JOINT AND M/U TO DUMMY HANGER - FMC REP BACK OUT LDS - PULL DUMMY HANGER TO RIG FLOOR L/D LANDING JT AND HANGER - OA =OPSI - 24 HOUR FLUID LOSS = 725 BBLS, 8.5 PPG SEA WATER - MAINTAIN CONTINUOUS HOLE FEED TO IA I@ 25 BPH 8.5 PPG SEA WATER 5/21/2013 00:00 - 01:30 1.50 RUNCOM P RUNCMP PJSM, PERFORM SPCC AND EQUIPMENT ( CHECKS - R/U CENTRILIFT EQUIPMENT - HANG SHEAVE, STRING FLAT ESP LEAD CABLE TO RIG FLOOR 01:30 - 03:30 2.00 RUNCOM P RUNCMP PJSM FOR RUNNING 4 1/2" COMPLETION - CENTRILIFT REP, TIE IN MLE, ESP CABLE TO MOTOR ASSY 03:30 - 06:00 2.50 RUNCOM P RUNCMP RIH WITH 4 1/2" 12.6# L -80 IBT ESP TT I COMPLETION - FROM SURFACE TO 1102' - PERFORM CONDUCTIVITY TEST EVERY 1000' - FILL PIPE AND BRK CIRCULATION AT .5 BPM EVERY 1000' MAKE -UP TUBING TO TQ -STAMP ON PIPE _ 3600 FT /LBS - INSTALL CANNON CLAMPS ON EVERY COLLAR - MAINTAIN CONTINUOUS HOLE FEED ON KILL LINE @ 25 BPH 8.5 PPG SEA WATER 06:00 - 12:00 6.00 RUNCOM P RUNCMP RIH WITH 4 1/2" 12.6# L -80 IBT ESP TT COMPLETION FROM 1102 FT. AROUND 2500 FT PERFORM KICK WHILE TRIPPING DRILL WITH AD ON THE BRAKE. ALL PERSONNEL GO TO ASSIGNED POSITIONS. SIMULATED CUTTING THE CABLE AND SHUTTING IN WELL. CONDUCT AAR AFTERWARDS. CONTINUE M/U COMPLETION. - RIH WITH 4 1/2" ESP TT COMPLETION F/ 1102' T/ 3705' MD 12:00 - 16:00 4.00 RUNCOM P RUNCMP PJSM WITH NEW CREW FOR RUNNING ESP COMPLETION - RIH W1TH 4 1/2" 12.6# L -80 IBT ESP TT COMPLETION - F/ 3705' T/ 5463' MD - PERFORM CONDUCTIVITY TEST EVERY 1000' - FILL PIPE AND BRK CIRCULATION AT .5 BPM EVERY 1000' i I - MAKE -UP TUBING TO TQ -STAMP ON PIPE = 3600 FT /LBS - INSTALL CANNON CLAMPS ON EVERY COLLAR CLAMPS USED -FLAT GUARDS =2 - PROTECTOLIZERS = 3 - 2' CANNON CLAMPS = 135 Printed 6/3/2013 10:36:03AM • • • North America - ALASKA - BP Rage 7 of 8 Operation Summary Report Common Well Name: MPG -16 AFE No Event Type: WORKOVER (WO) Start Date: 5/17/2013 End Date: 5/22/2013 X4- OOXMN- E:DRILL (2,090,000.00 ) Project: Milne Point Site: M Pt G Pad Rig Name /No.: DOYON 16 Spud Date/Time: 1/21/2004 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. U' 1: Active datum: Kelly Bushing / Rotary Table @62.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) ' 16:00 - 20:00 4.00 RUNCOM P RUNCMP M/U 10" X 4 1/2" HANGER WITH 4 1/2" TC -2 TOP AND BOTTOM THREADS, 4" "H" PROFILE - INSTALL TWC IN HANGER ' - M/U LANDING JOINT TO HANGER - TERMINATE ESP CABLE AT HANGER AND ' TEST CONDUCTIVITY, GOOD TEST DAY WSL PERFORM FACE TO FACE HAND OVER FROM MPU OPS COORDINATOR FOR NEXT WELL MPJ -10. 20:00 - 20:30 0.50 RUNCOM P RUNCMP LAND HANGER IN TUBING SPOOL FMC REP RUN IN LOCK DOWN SCREWS B/O LANDING JOINT AND UD 20:30 - 21:00 0.50 RUNCOM P RUNCMP PERFORM ROLLING TEST ON TWC FROM BELOW - 6.5 BPM = 150 PSI, 10 MIN, 66 BBLS PUMPED AWAY, 0 BBLS BLEED BACK - TEST TWC FROM ABOVE, 250 / 3500 PSI, 5 MIN, CHARTED - R/D TEST EQUIPMENT 21:00 - 22:00 1.00 BOPSUR P RUNCMP PJSM, REMOVE BLIND SHEAR RAMS FROM BOP STACK FOR RE- CONFIGURE -PULL MOUSE HOLE, CLEAR RIG FLOOR 22:00 - 00:00 2.00 BOPSUR P RUNCMP N/D BOP STACK AND STAND BACK ON PEDESTAL - PULL RISER, REMOVE TURNBUCKLES - POWER DOWN ACCUMULATOR AND I i DISCONNECT LINES TO BOP - OA = O PSI - 24 HOUR FLUID LOSS = 687 BBLS, 8.5 PPG SEA WATER - MAINTAIN CONTINUOUS HOLE FEED TO IA © 25 BPH 8.5 PPG SEA WATER WITH NO RETURNS 5/22/2013 00:00 - 02:00 2.00 WHSUR P RUNCMP 1 PJSM, PERFORM SPCC AND EQUIPMENT CHECKS N/U 11" X 4 1/16" ROTATING FLANGE TUBING HEAD ADAPTER WITH ESP PENETRATOR PORT - FMC REP. TESTED TO 250 PSI LOW 5 MIN, 5000 PSI HIGH 30 MIN, GOOD TEST WSL HAVE FACE TO FACE WITH PAD OPS TO OPEN "WELL WORK TRANSFER PERMIT' ON MPJ -10. 02:00 - 03:30 1.50 WHSUR P RUNCMP N/U 4 1/16" 5K CAMERON TREE - FMC VERIFY TREE ALIGNMENT - TEST, 250 PSI LOW, 5000 PSI HIGH 5 MIN, - I CHARTED, GOOD TEST Printed 6/3/2013 10:36:03AM • i • North America - ALASKA - BP Page 8 of 8 Operation Summary Report Common Well Name: MPG -16 1 AFE No Event Type: WORKOVER (WO) Start Date: 5/17/2013 I End Date: 5/22/2013 IX4- 00XMN- E:DRILL (2,090,000.00 ) Project: Milne Point Site: M Pt G Pad Rig Name/No.: DOYON 16 Spud Date/Time: 1/21/2004 12:00:OOAM Rig Release: Rig Contractor: DOYON DRILLING INC. UWI: Active datum: Kelly Bushing / Rotary Table @62.90usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) _ 03:30 - 07:00 3.50 WHSUR P RUNCMP R/U DSM LUBRICATOR TO TREE TO PULL TWC TEST LUB 250 / 3500 PSI, 5 MIN, CHARTED, PULL TWC - TEST LUB 250 / 3500 PSI, 5 MIN, CHARTED, INSTALL BPV - R/D DSM LUBRICATOR AND CLEAR RIG FLOOR - PERFORM ROLLING TEST FROM BELOW BPV, 6 BPM = 150 PSI, 10 MIN, 80 BBLS PUMPED AWAY, 0 BBLS BLEED BACK -FILL TREE WITH DIESEL. RIG RELEASED AT 07:00 HRS 5/22/2013 FROM MPG -16 FOR MOVE TO MPJ -10. Printed 6/3/2013 10:36:03AM i Tree: 4-1/2" - 5M Cameral) G -16 L � of elev. = 62.90' (Doyon 14) M P Wellhead: 5M Gen 5 / Or L. elev.= 29.20' (Doyon 14) 11 "x 11" w/ 4 1/2" TC -II T &B Hanger 4.5" CIW "H" BPV profile L 20' 178 #/ft .875 thick Driven conductor 120' Camco 4 -1/2" x 1 " w/ BK latch 155' sidepocket KBG -2 GLM 10 3/4" L -80 Float Shoe I 2,526' I ■ Camco 4 -1/2" x 1 "w/ BK latch 5,203' sidepocket KGB -2 GLM KOP @ 200' 60+ degree from 3,800' Max hole angle = 66 degree @ 5,550' g D & D Tbg. Stop 5,404' D & D Packoff w /Kobe Knockout 5,406' TTC ESP 380 SXD 116 P18 5,413' 10 3/4" 45.5 ppf L -80 BTRC (Drift ID = 9.794, cap. _ .0961 bpf) TTC Drilled Tbg. Crossover I 5,432' • 7 5/8" 29.7 ppf, L -80, BTRC -mod production casing • 4 1/2" IBT Box X 4 1/2" NSCT Pin ••• ( drift ID = 6.750 ", cap. = 0.0459 bpf) Centrilift tandem seal section I 5,442' 4.5 ", 12.6 #, L -80 IBT tbg. liner I GSB3DBUT / GSB3DBLT ( cap. = .0152 bpf, id = 3.958) 1 ! 4.5" 12.6# L -80 IBT tubing L Motor - MPS1 -250 / 84 HP 2210 volt / 23 amp Rerated to - 325 / 60 HP 2050 volt / 18 amp 5,456' (drift ID = 3.958 ", cap. = 0.0152 bpf) 5 Centrilift Pump mate sensor 5,464' O O 6 Fin Motor centrilizer 5,466' Baker Hook Wall Hanger inside 7" Window 5,643' Baker Hook Wall Hanger outside 7" Window 5,600' Window in 7" Casing @ 5,648' - 5673' 6 1/8" Hole td @ 10,030' Well Angle @ window = 72° 4- 103 jts. - 4 1/2" Slotted Liner Ra40 ole OA Upper Lateral 12.6# L -80 IBT (5,711`- 9,947') Btm Baker 4 1/2" Guide Shoe 9,990' Baker Tie Back Sleeve 5,775' Baker ZXP Liner Top Packer 5,782' Baker 7 -5/8" x 5 -1/2" HMC Liner Hanger 5,788' -. 6 1/8" Hole td @ 9,561' 7 5/8" Halliburton Float Collar 6,175' 7 5/8" Halliburton Float Shoe 6,260' \........., OB Lower Lateral 76 jts. - 4 1/2", 12.6# L -80, IBT Rat Hole Slotted Liner (6,054'- 8,976') 583' Btm Baker 4 1/2" Float Shoe 8,978' DATE REV. BY COMMENTS M I LN E POINT UNIT 02/03/04 MDO Drilled & Completed Doyon 14 WELL G -16 05/25/13 B. Bixby Doyon 16 RWO Conversion to TTC ESP API NO: 50-029-23189-60 L1 API NO: 50- 029 - 23189 -00 BP EXPLORATION (AK) • • ~.~ -:~ -~. ~g_,,,: ~,.:. ;. ~.. ,~-` ~~ '~ 03/01 /2008 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\C~rPgs_Inserts\Microfilm Marker.doc · . WELL LOG TRANSMITTAL DO 'J ~-~ I ( To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 February 16, 2006 /36/1 RE: MWD Formation Evaluation Logs MPG-16 Ll, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPG-16 Ll: LAS Data & Digital Log Images: 50-029-23189-60 1 CD Rom e/\QtQQl!·~. '\oyy Ult> ~/ u (J , 1 Ml1\vv~\. DATA SUBMITTAL COMPLIANCE REPORT 2/7/2006 Permit to Drill 2032110 Well NamelNo. MILNE PT UNIT SB G-16L 1 ;y;~ ; 1Jf~ Áf!;tH API No. 50-029-23189-60-00 Operator BP EXPLORATION (ALASKA) INC MD 10030_' TVD 4401../ Completion Date 2/3/2004./ Completion Status 1-01L UIC N REQUIRED INFORMATION Mud Log No DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, ASI, IFRtCASANDRA Well Log Information: Logl Electr Data Digital Dataset Type MedlFrmt Number Name ~. D Asc Directional Survey ~. Directional Survey -ED D Asc Directional Survey .~pt Directional Survey ....5Ð D Lis 12468 Induction/Resistivity ¡-Rþt LIS Verification I l.eo D Lis 12468 Rate of Penetration I lR'pt LIS Verification I Well CoreslSamples Information: Name Interval Start Stop ADDITIONAL INFOR~NION Well Cored? yiG:) Chips Received? ''N-N-- Analysis Received? .~ Comments: Current Status 1-01L Samples No Directional surveG) (data taken from Logs Portion of Master Well Data Maint . Log Log Run Interval OH/ Scale Media No Start Stop CH Received Comments 5646 10030 3116/2004 5646 10030 311612004 5646 10030 311612004 MWD 5646 10030 3116/2004 MWD 1,2,6,7 5648 10030 3118/2004 GR, EWR4, ROP 1,2,6,7 5648 10030 3/18/2004 GR, EWR4, ROP 1,2,6,7 5648 10030 3/18/2004 GR, EWR4, ROP 1,2,6,7 5648 10030 3/18/2004 GR, EWR4, ROP Sample . Set Sent Received Number Comments Daily History Received? ~N Q'N Formation Tops Permit to Drill 2032110 MD 10030 TVD Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 2/7/2006 Well Name/No. MILNE PT UNIT SB G-16L 1 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23189-60-00 4401 c:¡ç;;: Oat, 2/3/2004 1-01L Current Status 1-01L UIC N Completion Status Date: Î f-;t h~-þ . . · STATE OF ALASKA I ALASKA~L AND GAS CONSERVATION COM ~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ... 1a. Well Status: !HI Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1990' NSL, 3443' WEL, SEC. 27, T13N, R10E Top of Productive Horizon: 2056' NSL, 570' WEL, SEC. 27, T13N, R10E, (OA) Total Depth: 2807' NSL, 2044' WEL, SEC. 26, T13N, R10E, (OA) 4b. Location of Well (State Base Plane Coordinates): Surface: x- 557160 ¡ y- 6014426~ Zone- ASP4 TPI: x- 560032 y- 6014514 Zone- ASP4 Total Depth: x- 563830 y- 6015296 Zone- ASP4 18. Directional Survey !HI Yes 0 No 21. Logs Run: MWD , GR , RES, ABI , IFRlCASANDRA One Other 5. Date Comp., Susp., or Aband. 2/3/2004 ,/ 6. Date Spudded 1/29/2004 .. 7. Date T.D. Reached 2/1/2004 / 8. KB Elevation (ft): KBE = 62.90' 9. Plug Back Depth (MD+TVD'<I~i /()()S&> 10077' or' + ..M8g.~ 1\ 10. Tot~1 Depth (MD+TVD) ___ ..¡'cibI' IDD!b ~ + M8g' "M 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL PER FT. 92# 45.5# 29.7# 12.6# CASING, liNER AND CEMENTING RECORD SETTING DEPTH Me SETIINGD!õÞTH TV :) HOLE TOp BOTTOM ToÞ BOTTOM SIZE 34' 120' 34' 120' 42" 35' 2527' 35' 2466' 13-1/2" 33' 5648' 33' 4288' 9-7/8" 5643' 9991' 4286' 4400' 6-1/8" 22. CASING SIZE 20" 10-3/4" 7-5/8" 4-1/2" H-40 L-80 L-80 L-80 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-112" Slotted Liner MD TVD MD TVD 5711' - 9947' 4302' - 4400' 26. Date First Production: March 4, 2004 Date of Test Hours Tested PRODUCTION FOR 3/3/2004 1 TEST PERIOD .. Flow Tubing Casing Pressure CALCULATED ........ Press. 24-HoUR RATE""'" 1b. Well Class: !HI Development 0 Exploratory o Stratigraphic Test 0 Service 12. Permit to Drill Number 203-211 13. API Number 50- 029-23189-60-00 14. Well Name and Number: MPG-16L 1 15. Field 1 Pool(s): Milne Point Unit / Schrader Bluff 16. Property Designation: ADL 025518 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) -rr¿J~ 6SVB 'nib tfz&8 ' -;VI> AMOUNT PUllED 260 sx Arctic Set (Approx.) 450 sx PF 'L', 260 sx Class 'G' 670 sx Class 'G' Uncemented Slotted Liner SIZE 2-7/8",6.5#, L-80 TUBING RECORD DEPTH SET (MD) 5468' PACKER SET (MD) None 24. 25. ACID, FRACTURE, CEMENT SaUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 87 Bbls of Dry Crude PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Electric Submersible Pump Oll-BBl GAs-McF WATER-BBL 33 6.87 .33 Oll-BBl 789 GAs-McF 165 WATER-BBl 8 I GAS-OIL RATIO 209 all GRAVITY-API (CORR) CHOKE SIZE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None r-·-··· .~ .,....., .... ".)"'..'-..'....'........" .,. '. j ~~~:t';:~ I \'F·:;:'·; ! I 'pt! L:,~~~.~~~,.,-"- Form 1 0-407 Revised 12/2003 n A CONTINUED ON REVERSE SIDE tfØIIS ßf~. MAR 'U ~ç 28. e GEOLOGIC MARKERS 29. - FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". SBF2-NA SBF21 SBF24-MF SBF1-NB SBF12 SBE4-NC SBE41 SBE3-ND SBE2-NE SBE1-NF TSBD-OA 5222' 5266' 5290' , 5301' 5343' 5355' 5367' 5379' 5407' 5532' 5643' 4099' 4120' 4131' 4137' 4157' 4163' 4169' 4174' 4188' 4246' 4286' None Jl)O 1:\ 30. List of Attachments: Summary of Daily Drilling Reports, Surveys, Well Schematic Diagram and a Leak-Off Test Summary. 31. I hereby certify that the foregoing is true a~d correct to the best of my knowledge. Signed Title Technical Assistant Date Œ- zz -Cf-~ MPG-16L 1 Well Number 203-211 Permit NO.1 Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By Name/Number: Drilling Engineer: Sandra Stewman, 564-4750 Matt Green, 564-5581 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 ~ ì L- legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To -------.------ 1/19/2004 1/20/2004 16:00 - 00:00 00:00 - 04:30 04:30 - 06:30 06:30 - 10:30 10:30 - 23:30 23:30 - 00:00 1/2112004 00:00 - 01 :00 01 :00 - 03:00 03:00 - 04:00 e e Page 1 of 7 BP EXPLORATION Operations Summary Report MPG-16 MPG-16 DRill +COMPlETE DOYON DRilLING INC. DOYON 14 Hours I Task 'Code NPT I 1/20/2004 2/4/2004 Spud Date: 1/21/2004 End: Start: Rig Release: Rig Number: Phase "... .....-..--.---..-. ....-------...- --..--.- ---------..-.--.--------..--------.-.-----.----.--.-....-- Description of Operations 8.00 MOB P PRE 4.50 MOB P PRE 2.00 RIGU P PRE 4.00 RIGU P PRE 13.00 DRILL P SURF 0.50 DRILL P SURF 1.00 DRILL P SURF 2.00 DRILL P SURF 1.00 RIGU P PRE 04:00 - 05:00 1.00 DRILL P SURF 05:00 - 05:30 0.50 DRILL P SURF 05:30 - 06:30 1.00 DRILL P SURF 06:30 - 00:00 17.50 DRILL P SURF 1122/2004 00:00 - 01 :00 1.00 DRILL P SURF 01 :00 - 02:30 1.50 CASE P SURF 02:30 - 04:00 1.50 CASE P SURF 04:00 - 04:30 0.50 CASE P SURF 04:30 - 06:30 2.00 CASE P SURF 06:30 - 07:30 1.00 CASE P SURF 07:30 - 09:30 2.00 CASE P SURF 09:30 - 10:30 1.00 CASE P SURF 10:30 - 13:00 2.50 CASE P SURF 13:00 - 14:00 1.00 CASE P SURF 14:00 - 16:30 2.50 CASE P SURF 16:30 - 19:00 2.50 CEMT P SURF Moving rig and camp to MPG-16 Moving rig to MPG-16, spotting over well, skid floor over well, rig accepted @ 04:30 1/20/2004 Nipple up Diverter - Take on H20 - Mixing spud mud Load pipe shed with 4" Drill pipe - Mix spud mud - Change equipment over to 4" Drill pipe Pick up 4" drill pipe stand in derrick 315 joints - Snow packed - Steam each joint - rabbit each joint - Stand back in derrick Change out 4" handling equipment to 5" handling equipment - Pick up 5" HWT - stand back in derrick Pick up 5" HWT drill pipe Pick up BHA to rig floor - Make up bit - motor - MWD - Orient same - Rig up Sperry Sun Gyro survey equipment Function test Divertor - Preform Accumulator test - John Spaulding with AOGCC wavied witness of Divertor Function Test - Pre Spud Meeting with all personnel - Surface test circ system - Fill conductor - check for leaks Drill Ice from 61' to 120' - Drill from 120' to 185' Run Gyro survey Pull out hole - Make up Flex DC's - RIH Directional Drill from 185' to 2355' - WOB 30K - RPM 90 - TQ on 6K - off 3K - GPM 540 - PP on 2730 - off 2480 - PU 1 02K - SO 97K - ROT 100K Directional Drill 13.5" Hole to T.D. - 2534' MD 2472 TVD- WOB 35K - RPM 100 - TQ on 7K - off 3.5K - GPM 540 - PP on 2730 - off 2400 - PU 1 05K - SO 1 OOK - ROT 105K CBU X 3 - RPM 100 - TQ 3.5K - GPM 540 - PP 2300 Pump out from 2534' to 725' 5" HWT - Pump at full drilling rate 540 gpm - Hole in good shape RIH from 726' to 2534' - Bridge @ 1900 - fell through - Pick up and run back through no problems CBU X 3 - RPM 100 - TQ 3.5K - GPM 540 - PP 2500 Pump out from 2534' to 725' to 5" HWT - Pump at drlg rate 550 gpm - No problems Stand back 5" HWT - Lay down Flex DC's - Stabilizers - MWD - Motor - Bit Rig up casing tools to run 10.75" casing - PJSM Run 60 joints 10 3/4" L-80 45.5# BTC casing to 2492' Make up FMC casing hanger - Land casing @ 2534' - Rig down Franks fill up tool - Make up Schlumberger cementing head Break circulation - staging up pump rate from 2 bpm to 10 bpm final circulation pressure 810 psi - Circulate and condition mud for cement job Give to Schlumberger - Pump 5 bbls CW 100 wash - Test lines to 3500 psi - Pump 15 bbls CW 100 wash @ 5 bpm 120 psi - Pump 60 bbls of 10.2 ppg Mud Push spacer @ 6 bpm 120 psi- Drop btm plug last 5 bbls of spacer - (added one gallon dye in first 5 bbls slurry pumped) - Mix and pump 450 sxs Type 'ASL' - Yield 4.45 cf/sx 356 bbls of 10.7 ppg @ 7 bpm 430 psi - Mix and pump 260 sxs Class 'G' cement with .7% S-001 accelaerator + .4% D-167 Fluid Loss + .3% D-065 Dispersant + .2% D-046 Antifoam - Yield 1.17 cu/sx - 54 bbls of slurry mixed @ 15.8 ppg @ 5 bpm 470 psi - DISPLACEMENT - Kick out top ,Printed: 2/9/2004 9:10:31 AM e e BP EXPLORATION Operations Summary Report Page 2 of 7 legal Well Name: MPG-16 Common Well Name: MPG-16 Spud Date: 1/21/2004 Event Name: DRill +COMPlETE Start: 1/20/2004 End: Contractor Name: DOYON DRilLING INC. Rig Release: 2/4/2004 Rig Name: DOYON 14 Rig Number: Date From - To I Hours I Task Code NPT Phase I Description of Operations I .._u__...__.._... _, ....---....-.......-...- -'- _.. ...... .__n.. _.. __..__._____.._ 1122/2004 16:30 - 19:00 2.50 CEMT P SURF plug with 30 bbls water with Schlumberger - Turn to rig - Displace with mud 204 bbls @ 8.5 bpm 650 psi - Bump plug with 1700 psi 1000 psi over circulating pressure - Bleed off pressure - Check floats - Floats holding - 149 bbls cement back to surface 19:00 - 20:00 1.00 CASE P SURF Flush Annular and flow line - Rig down Schlumberger cement head & cement lines - Back out & Lay down landing joint 20:00 - 21 :00 1.00 CASE P SURF Rig down casing equipment - Lay down tools - Rig down Divertor line 21:00 - 22:00 1.00 CASE P SURF Nipple down Divertor Annular - Knife valve 22:00 - 23:00 1.00 CASE P SURF Nipple up FMC speed head - Test metal to metal seal to 1000 psi for 10 mins - ok 23:00 - 00:00 1.00 CASE P SURF Nipple up BOP's 1123/2004 00:00 - 01 :00 1.00 CASE P SURF Nipple up BOP's 01 :00 - 02:00 1.00 CASE P SURF Open annulus valve - Install test plug - Rig up testing equipment 02:00 - 05:30 3.50 CASE P SURF Testing BOP's - 250 low 2500 high Annular - 5 mins each test - 250 low 3500 - Pipe rams - Blind rams - Choke manifold - HCR choke I HCR kill - Manual Choke / Manual Kill - Upper I Lower IBOP - Floor safety valves - 5 mins each test - Test good - John Spaulding with AOGCC waived witness of BOP test 05:30 - 06:30 1.00 CASE P SURF Rig down testing equipment - Pull test plug - Installed wear ring - Close annulus valve 06:30 - 08:30 2.00 CASE P SURF Made up BHA: 9-7/8" Smith GFXiVC bit jetted with 3-15s and 1-10 center jet. Picked up adjustable motor and set at 1.22 degrees. Made up MWDIGRIRes. 08:30 - 09:00 0.50 CASE P SURF Run in hole with 4" drill pipe to 2430' (Float collar at 2441') 09:00 - 10:00 1.00 CASE P SURF Slip and cut drill line. Service top drive. 10:00 - 11 :00 1.00 CASE P SURF Rigged up to test casing with cementing line. Pressure tested 10-3/4" casing to 2500 psi for 30 minutes. Recorded test on chart. Good test. 11 :00 - 12:00 1.00 DRILL P SURF Drill float collar, shoe track float shoe and 20' of new hole to 2554' 12:00 - 12:30 0.50 CASE P SURF Displaced mud in hole with new 8.9 ppg mud 12:30 - 13:30 1.00 CASE P SURF Performed FIT on 10-3/4" casing shoe. Mud weight 8.9 ppg, 2465' TVD and 350 psi. 11.6 ppg EMW. 13:30 - 00:00 10.50 DRILL P INT1 Directional Drill from 2554' to 4173' - WOB 30 - RPM 120 - TQ on 8K - off 4K - GPM 500 - PP on 2700 - off 2400 - PU 122K- SO 96K - ROT 107K 1/24/2004 00:00 - 23:00 23.00 DRILL P INT1 Directional Drill from 4173' to 6267' - TD 9 7/8" hole - WOB 35K - RPM 120 - TQ on 8K - off 5K - GPM 500 - PP on 3320- off 3120 - PU 125K - SO 100K - ROT 105K 23:00 - 00:00 1.00 CASE P INT1 CBU 3 X - RPM 120 - TQ 5K - GPM 550 - PP 3600 1/25/2004 00:00 - 01 :30 1 .50 CASE P COMP Continue CBU 3 X - GPM 550 - RPM 120 - TQ 5K 01 :30 - 04:00 2.50 CASE P COMP Pump out hole @ drlg rate to 5020' - Mad Pass from 5020' to 4720' and 4420' to 4220' - Log at 400' per hour - No rotation 04:00 - 05:00 1.00 CASE P COMP Continue pump out to shoe from 4200' to 2526' 05:00 - 06:00 1.00 CASE P COMP Monitor well - Run in hole with no problems 06:00 - 10:00 4.00 CASE P COMP Broke circulation. Lots of clay balls blinding scalpers. Circulated 3 bottoms up - GPM 550 - RPM 120 - TQ 5K 10:00 - 12:00 2.00 CASE P COMP Pump out of hole @ full drilling rate to shoe at 2526'. 12:00 - 12:30 0.50 CASE P COMP Circulate bottoms up at shoe to assure hole is clean. 550 GPM. Monitor well. Pump slug. Printed: 21912004 9:10:31 AM e e Page 3 of 7 BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date MPG-16 MPG-16 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 1125/2004 1/2612004 I I From - To! Hours ¡Task Code NPT, Phase 12:30 - 13:30 1.00 CASE P COMP 13:30 - 14:00 0.50 CEMT P COMP 14:00 - 15:30 1.50 CASE P COMP 15:30 - 16:00 0.50 CASE P COMP 16:00 - 17:30 1.50 CASE P COMP 17:30 - 19:00 1.50 CASE P COMP 19:00 - 22:00 3.00 CASE P COMP 22:00 - 00:00 2.00 CASE P COMP 00:00 - 01 :00 1.00 CASE P COMP 01 :00 - 01 :30 0.50 CASE P COMP 01 :30 - 04:00 2.50 CASE P COMP 04:00 - 04:30 0.50 CASE P COMP 04:30 - 07:00 2.50 CASE P COMP 07:00 - 08:00 1.00 CEMT P COMP 08:00 - 09:00 1.00 CEMT P COMP 09:00 - 09:30 0.50 CEMT P COMP 09:30 - 10:30 1.00 CASE P COMP 10:30 - 12:00 1.50 CASE P COMP 12:00 -13:30 1.50 CASE P COMP 13:30 - 16:00 2.50 CASE P COMP 16:00 - 16:30 0.50 CASE P COMP 16:30 - 17:00 0.50 CASE P COMP 17:00 -18:00 1.00 CASE P COMP 18:00 -19:30 1.50 CASE P COMP 19:30 - 20:00 0.50 CASE P COMP 20:00 - 00:00 4.00 DRILL P PROD1 Start: Rig Release: Rig Number: Spud Date: 1/21/2004 End: 1/20/2004 2/4/2004 Description of Operations Pulled out of hole with 4" drill pipe. Stand collars in derrick. Laid down MWD and motor. Stand back 5" HWT - Flex DC's Lay down MWD - Motor - Bit - Clear rig floor Rig up Schlumberger E-Line for Side Wall cores RIH with SWC on E-Line - Tools would not pass 3332' - Pull out hole - Rig down Schlumberger E-Line tools Run Flex DC's - 5 HWT in hole - Lay down Same Change Top rams to 7 5/8" - Test door seals to 1500 psi - Rig up casing tools PJSM (Running casing) - Pick up float joints - Check floats - Run 7 5/8" L-80 29.7# BTC-M casing To 1270' Con't Run 7 5/8" casing to 2465' (59 jts) Circulate 1 casing volume 1150 stks (115 bbls) - 6 bpm 375 psi Con't Run 7 5/8" casing from 2465' to 6185' - Break circulation - Precauctionary wash from 6183' to 6225' Make up hanger I Landing joint - Land on hanger - (Shoe 6260' - Float collar 6175' - Ran 151 joints 7 5/8" L-80 29.7# BTC-M casing with 2 space out pup joints) - Lay down Franks fill up tool - Make up Schlumberger cementing head I Lines Break circulation - Stage up pump from 3 bpm to 6 bpm @ 350 - circulate I condition mud for 7 5/8" cement job Pump 5 bbls of water - test lines to 3500 psi - pump 15 bbls of CW 100 chemical wash - pump 50 bbls of 10.8 ppg mud push- dropped bottom plug - mixed and pumped 143 bbls of Class G cement wI .3% D065 Dispersant + .7% S001 Accelerator + .4% D167 Fluid Loss + 3% D174 Expanding CE + .2% D046 Anti-Foam mixed in a 15.8 ppg slurry with a yield of 1.2 cftlsx. Kicked out top plug with 20 bbls of water. Displaced cement with rig pumps at 6 bpm. Initial circulating pressure 110 psi and increased to 700 psi before bumping plug. Bumped plug at 0853 hrs 1/26/2004 with 1700 psi. Held pressure 5 minutes. Bled off pressure - floats held. Rigged down cementing head and laid out landing joint. Install 7-5/8" casing packoff and test to 5000 psi. Good test. Laid down casing tools and remove long bales. Removed 7-518" rams and installed 2-718" X 5" VBR. Tested to 2000 psi. Installed wear ring. Make up BHA - Test MWD 5.5 bpm @ 870 psi - @ 13:00 hrs freeze protected 103/4" X 7 5/8" annulus with 80 bbls diesel 2 bpm @ 1100 psi RIH from 204' to 6150' Circulate 1 Drill pipe volume - 5.5 bpm @ 1650 psi Test 7 5/8" casing for 30 mins @ 3500 psi - Good test - Recorded on chart Drill float equipment - cement - Clean out to 6267' Drill 20 new hole to 6287' - 60 rpm - TQ 5K - 5.5 bpm 1700 psi Displace well with 9 ppg FloPro - 60 rpm TQ 5K - 5.5 bpm - 1500 psi Perform FIT - MD 6260' - TVD 4391' - Mud weight 9 ppg- Surface pressure 480 psi = 11.1 ppg EMW Directional Drill from 6287' to 6650' - WOB 5K to 7K - RPM 90 - Printed: 219/2004 9:10:31 AM e e Page 4 of 7 BP EXPLORATION Operations Summary Report Legal Well Name: MPG-16 Common Well Name: MPG-16 Event Name: DRILL +COMPLETE Contractor Name: DOYON DRILLING INC. Rig Name: DOYON 14 Date I From - To Hours Task; Code I NPT ! I 1/26/2004 1/2712004 1/2812004 1/2912004 1/3012004 Phase 20:00 - 00:00 4.00 DRILL P PROD1 00:00 - 10:30 10.50 DRILL P PROD1 10:30 -11:00 0.50 DRILL N DPRB PROD1 11:00-17:00 6.00 DRILL N DPRB PROD1 17:00 - 22:00 5.00 DRILL P PROD1 22:00 - 23:00 1.00 DRILL N DPRB PROD1 23:00 - 00:00 1.00 DRILL N DPRB PROD1 00:00 - 04:00 4.00 DRILL N DPRB PROD1 04:00 - 20:00 16.00 DRILL P PROD1 20:00 - 22:00 2.00 CASE P COMP 22:00 - 00:00 2.00 CASE P COMP 00:00 - 00:30 0.50 CASE P COMP 00:30 - 01 :00 0.50 CASE P CaMP 01 :00 - 03:00 2.00 CASE P CaMP 03:00 - 04:00 1.00 CASE P COMP 04:00 - 04:30 0.50 CASE P COMP 04:30 - 06:30 2.00 CASE P COMP 06:30 - 09:00 2.50 CASE P COMP 09:00 - 09:30 0.50 CASE P COMP 09:30 - 10:00 0.50 CASE P COMP 10:00 - 11 :30 1.50 CASE P COMP 11 :30 - 12:00 0.50 CASE P COMP 12:00 - 14:00 2.00 STWHIP P PROD2 14:00 - 14:30 0.50 STWHIP P PROD2 14:30 - 15:00 0.50 STWHIP P PROD2 15:00 - 15:30 0.50 STWHIP P PROD2 15:30 - 17:00 1.50 STWHIP P PROD2 17:00 - 17:30 0.50 STWHIP P PROD2 17:30 - 20:00 2.50 STWHIP P PROD2 20:00 - 20:30 0.50 STWHIP P PROD2 20:30 - 00:00 3.50 STWHIP P PROD2 00:00 - 00:30 0.50 STWHIP P PROD2 00:30 - 01 :00 0.50 STWHIP P PROD2 01 :00 - 02:00 1.00 STWHIP P PROD2 02:00 - 02:30 0.50 STWHIP P PROD2 02:30 - 04:00 1.50 STWHIP P PROD2 04:00 - 04:30 0.50 STWHIP P PROD2 Start: 1/20/2004 Rig Release: 2/4/2004 Rig Number: Spud Date: 1/21/2004 End: Description of Operations .._ ________. _. _.n _...____._ .. ....-.-.- .... TQ on 6K - off 5K - GPM 250 PP on 1500 - off 1450 - PU 120K - SO 97K - ROT 11 OK Directional Drill from 6650' to 7498' - Pull back to 7050' for side track Open hole side track @ 7050' - 4414 TVD - ST 1 - (180 low side) Directional Drill from 7050' to 7498' MD Directional Drill from 7498' to 7936' MD - TVD 4351' Pull back to 7548' for side track - Pump out at drlg rate Open hole side track @ 7548' MD - 4392 TVD - ST 2 - (180 low side) Directional Drill ST 2 - From 7548' to 7936' Directional Drill ST 2 - From 7936' to 9561' - WOB 5K - RPM 90 - TQ on 5K - off 4.5K - GPM 250 - PP on 2030 - off 1850 - PU 117 - SO 82 - ROT 103 CBU 3 X - GPM 275 - PP 2010 - RPM 100 - TQ 5K Pump out to 6961' - Drlg rate 250 gpm Pump out to shoe from 6961' to 6214' CBU - GPM 275 - PP 1400 - Monitor well - Well static - Pump Dry job POH to BHA from 6214' to 205' Stand back Flex DC's - Flush BHA with water - Lay down MWD - Motor - BIT Clear Floor - Rig up casing tools to run 4.5" Slotted Liner PJSM - PU 76 joints L-80 12.6# 4.5" IBT Slotted Liner - Baker Hanger - Liner top packer RIH with 4.5" Liner to 8977' (Shoe depth 8977') (Top liner 5775') Drop ball set Baker Hanger and Liner top packer - Test backside to 1000 psi - Release off Liner Monitor well - Well stable - Pump dry job POH with Baker Running Tool Lay down Baker Running tool - Clear Rig floor Pick up 43/4" DC's - 3 112" HWT from pipe shed Pump string vol to make sure BHA is clear and clean - 8 to 10 bpm @ 200 psi Stand back DC's / HTW Bring BHA up V-door slide to rig floor Make up Baker Whipstock BHA - Orient same - Surface test MWD @ 333' - 6.5 bpm - 500 psi RIH with DC's - HWT - Whipstock assembly RIH to 5648' - Orient Baker Whipstock - Set whipstock @ 5648' (Straight up 7 degree R) _---..- ~-- Mill window at 5648' - 5664' - RPM 100 - TQ 4 to 5 - GPM 280 _ ~~¡r'\ PP 1350 - ~rc....\ . Milling window from 5664' to 5673' - RPM 100 - TQ 4 to 5 - ~ c. > GPM 280 - PP 1400 - WOM 2 to 5 J Work through window with mills - Pump sweep - Circulate Circulate hole while - Cutting drlg line - Top Drive service - Rig service Flow check - Pump Dry job POH to Milling assembly Lay down Milling assembly - Make up stack washer - Flush Printed: 2/9/2004 9: 1 0:31 AM - e Page 5 of 7 BP EXPLORATION Operations Summary Report PROD2 BOP's - Lay down stack washer PROD2 Pull wear ring - Install test plug - Open annulus valves - Rig up testing equipment PROD2 Test BOP's - Annular 250 low 2500 high 5 mins each test - Top I Btm Rams I Choke Manifold I HCR Choke / HCR Kill I Manual Choke / Manual Kill/ Upper / Lower IBOP I Floor Safety Valves / Blind Rams 250 low 3500 high 5 mins each test - Accumulator test - One failure - Upper IBOP valve would not test Change out Upper IBOP valve Retest Upper IBOP valve - Test good - John Crisp with AOGCC waived witness of BOP test Rig down Testing equipment - Pull Test plug - Set wear ring - close annulus valves Make up 6 1/8" BHA - Motor set 1.5 - (ABII RES I GR I MWD) - Surface test MWD - 240 gpm - @ 820 psi RIH to 5673' - No Problem going thru window - TOW 5648' BOW 5660' Directional Drill from 5673' to 6441' - WOB 5K - RPM 90 - TO on 4 - off 3 - GPM 250 PP on 1670 off 1500 - PU 112K - SO 95K - ROT 105K Directional Drill from 6441' to 9320' - WOB 5K - RPM 90 - TO on 5K - off 5K - GPM 250 - PP on 2130 - off 1930 - PU 123K- SO 78K - ROT 101 K Directional Drill from 9320' to 9657' - WOB 5K - RPM 90 - TO on 5K - off 5K - GPM 250 - PP on 2300 - off 2100 - PU 123K- SO 80K - ROT 100K Circulate while Geologist consults with town - GPM 254 - PP 2120 - RPM 90 - TO 5K Directional Drill from 9657' to 10030' - TD 6118" hole (OA Lateral) - WOB 5K - RPM 90 - TO on 5K - off'5K - GPM 275- PP on 2300 off 2060 - PU 125K - SO 80K - ROT 100K Circulate 3 X - RPM 100 - GPM 275 - PP (ICP 2350 - FCP 2020) - SO weight without pump 80K Pump out from 10030' to shoe 5690' - Pump out at drlg rate 250 GPM - Shut pump off 30' below bottom of window@ - No problems pulling through window CBU @ 5585' - GPM 250 - PP 1420 - RPM 60 - TQ 2K Flow check - Pump dry job - POH from 5585' to 205' @ BHA Lay down BHA Down Load - Up Load MWD - Orient tool Make up Baker whipstock BHA RIH to 5640' Orient hook to 7 DEG right - RIH to 5653' - Latch onto Baker whipstock - Pull 40K over PU weight - Jars fired once - Whipstock free - Stand one stand back @ 5585' - Flow check well - well stable CBU - GPM 250 - PP 1110 - Flow check - Well stable - Pump dry job POH - Hole swabbing - Pull slowly out of hole from 5585' to 4113' Con't POH with Baker Whipstock - Hole taking proper fill - POH to BHA Date MPG-16 MPG-16 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 From - To I Hours: Task i Code I NPT I 04:00 - 04:30 0.50 STWHIP P 04:30 - 05:30 1.00 BOPSUR P Phase Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ....-...-...----- 1/3012004 05:30 - 08:30 3.00 BOPSURP 08:30 - 11 :00 2.50 BOPSURN RREP PROD2 11:00-12:00 1.00 BOPSUR N RREP PROD2 12:00 - 12:30 0.50 BOPSUR P PROD2 12:30 - 13:30 1.00 STWHIP P PROD2 13:30 - 15:00 1.50 STWHIP P PROD2 15:00 - 00:00 9.00 DRILL P PROD2 1/3112004 00:00 - 00:00 24.00 DRILL P PROD2 211/2004 00:00 - 03:30 3.50 DRILL P PROD2 03:30 - 04:00 0.50 DRILL P PROD2 04:00 - 08:30 4.50 DRILL P PROD2 08:30 - 11 :00 2.50 CASE P COMP 11 :00 - 14:30 3.50 CASE P COMP 14:30 - 15:00 0.50 CASE P COMP 15:00 - 17:30 2.50 CASE P COMP 17:30 - 18:00 0.50 CASE P COMP 18:00 - 19:00 1.00 CASE P COMP 19:00 - 19:30 0.50 CASE P COMP 19:30 - 21 :30 2.00 CASE P COMP 21 :30 - 22:00 0.50 CASE P COMP 22:00 - 22:30 0.50 CASE P COMP 22:30 - 00:00 1.50 CASE P COMP 2/2/2004 00:00 - 01 :30 1.50 CASE P COMP Start: 1/20/2004 Rig Release: 2/4/2004 Rig Number: Spud Date: 1/21/2004 End: Description of Operations ..---....-........ ... - ...---.........---- Printed: 2/9/2004 9: 1 0: 31 AM e e BP EXPLORATION Operations Summary Report Page 6 of 7 Legal Well Name: MPG-16 Common Well Name: MPG-16 Spud Date: 1/21/2004 Event Name: DRILL +COMPLETE Start: 1/20/2004 End: Contractor Name: DOYON DRILLING INC. Rig Release: 2/4/2004 Rig Name: DOYON 14 Rig Number: Date From - To Hours I Task Code NPT Phase Description of Operations .__ .__.__. ___ .ow "." . 2/2/2004 01 :30 - 04:00 2.50 CASE P COMP Lay down 3 1/2" HWT - Lay down 4 3/4" Spiral DC's 04:00 - 04:30 0.50 CASE P COMP Lay down Tailpipe assembly 04:30 - 05:00 0.50 CASE P COMP Clear rig floor - Lay down MWD - Baker Tools 05:00 - 08:30 3.50 CASE P COMP Rig up casing tools to run 41/2" slotted liner - PJSM - Run 4.5" L-80 12.6# IBT Slotted liner - Change out elevators to 3112"- Pick up / Make up Baker Hook Wall Liner Hanger 08:30 - 09:00 0.50 CASE P COMP RIH with Liner on 4" DP to Window @ 5654' 09:00 - 09:30 0.50 CASE P COMP Attempt exit window @ 5654' - Rotate 1 1/2 turns to right - Tag window top - Pull back - Rotate 1 turn to right - Tag window top - Pull back to 5656' - Rotate 112 turn to right - exit through window 09:30 - 11 :00 1.50 CASE P COMP RI H from 5656' to 9990' 11:00 -11:30 0.50 CASE P COMP Orient Hook Wall Hanger to Hook window @ 5662' Drill pipe measurement - Verify Hook depth by unhooking - Rotating - going down to 5670' DP measured depth - Pull back - Re-hook Hook on window @ 5662' - Liner shoe depth 9992' 11 :30 - 12:30 1.00 CASE P COMP Drop ball - pump ball down - Pump rate 127 gpm @ 380 psi - Slow rate to 42 gpm @ 220 psi - Ball on seat - Pressure up to 3000 psi to release hanger - Pull running tool out of hanger - Pressure up to 4200 psi to blowout ball of running tool 12:30 - 13:00 0.50 CASE P COMP Pump dry job - Stand back 12 stands 13:00 - 16:00 3.00 CASE P COMP Lay down 26 stands of 4" drill pipe 16:00 - 16:30 0.50 CASE P COMP Lay down running tool and make up circ sub 16:30 - 18:30 2.00 CASE P COMP RIH to 5630' 18:30 - 21 :00 2.50 CASE P COMP Displace well from 9.2 Flo Pro to 8.5+ Seawater - Pump sweep - Chase with new seawater surface to surface until clean - RPM 120 - TQ 2K - 10 BPM @ 1300 psi - PU 110K - SO 100K - ROT 105K 21 :00 - 22:30 1.50 CASE P CaMP Cut Drlg Line - Rig Service - Top Drive service 22:30 - 23:30 1.00 CASE P COMP POH - Standing 40 stands in derrick 23:30 - 00:00 0.50 CASE P COMP Lay down 4" drill pipe 213/2004 00:00 - 01 :00 1.00 CASE P COMP Con't Laying down 4" Drill Pipe 01 :00 - 02:30 1.50 RUNCOMP COMP Pull wear ring - Clear rig floor - Rig Up to Run 2 718" ESP completion 02:30 - 06:00 3.50 RUNCOMP COMP PJSM with Doyon Crew - Centrilift Tech - Co Man - Pick up ESP pump - Fill with oil - Make up pump and motor assy - Tie ESP cable to motor / pump assembly - Test 06:00 - 13:00 7.00 RUNCOMP COMP Picking up 2 7/8 6.5# L-80 tubing to 4,749 13:00 - 14:00 1.00 RUNCOMN SFAL CaMP Repair ESP line spool trailer 14:00 - 15:00 1.00 RUNCOMP COMP Picking up 2 7/8 Tubing to 5,435, total of 171 jts. 15:00 - 17:30 2.50 RUNCOMP COMP Make up Hanger, install ESP cable into hanger, land tubing @ ,/ 5,467171 HP motor @ 5,447, Tandem gas separator 5,428, pump type 1225,407, XN nipple 5,364, KBMM-2 GLM 5,255,KBMM-2 GLM w/ dual orfice valve 107, use 192 Lasalle clamps 17:30 -18:00 0.50 RIGD P COMP Lay down landing jt. test two way check to 1000 psi from top 18:00 - 19:00 1.00 RIGD P COMP Nipple down Bops 19:00 - 20:30 1.50 RIGD P COMP Nipple up adapter flange and 2 9116 5000# tree, test adapter and tree to 5000 psi, test the integrity of ESP cable 20:30 - 21 :00 0.50 RIGD P CaMP Pull TWC and Install BPV in tree 21 :00 - 23:00 2.00 RIGD P COMP Rig up First Energy, test lines to 3,500 psi, Bull head down annulus 75 bbls dry crude 1.5 bbls min 1100 psi, bull head down tubing 12 bbls dry crude 1 bbls min 1250 psi, move 20 Printed: 219/2004 9: 1 0:31 AM e e Page 7 of 7 BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: M PG-16 M PG-16 DRILL +COMPLETE DOYON DRILLING INC. DOYON 14 From - To I Hours Task I Code NPT ¡ . I ' Date 2/312004 .-----.- -.....--...-... 21 :00 - 23:00 23:00 - 00:00 2.00 RIGD P 1.00 RIGD P Start: 1/20/2004 Rig Release: 2/4/2004 Rig Number: Spud Date: 1/21/2004 End: Phase Description of Operations .0_____..0. __._____._ COMP sds of pipe in derrick to drillers side COMP Secure well, remove double annulus valve, bull plug valves, suck out cellar. Rig release to move @ 2400 hrs 21312004 Printed: 21912004 9: 1 0: 31 AM Tree: 2-9/16" - 5M FMC Wellhead: 5M Gen 5 _ 11"x 11" w/2-7/S" Srd T&_ Hanger 2.5" CIW "H" BPV profile ~ 20' 178 #/ft .875 thick Driven conductor om 103/4" L-BO Float Shoe 12,526'1~ KOP @ 200' 60+ degree from 3,BOO' Max hole angle = 66 degree @ 5,550' 103/4" 45.5 ppf L-80 BTRC (Drift ID = 9.794, cap. = .0961 bpf) 7 5/B" 29.7 ppf, L-80, BTRC-mod production casing (drift ID = 6.750", cap. = 0.0459 bpf) 4.5", 12.6#, L-BO IBT tbg. (cap. = .0152 bpf, id =3.958) 2-7/8" 6.5# L-80 EUE 8ra tubing (drift 10 :::: 2.347", cap. :::: O.005ß bpf ) Window in 7" Casing @ 5,64S' - 5673' Well Angle @ window = 72° Od<:¡. DF (Ú:~v. ,;= U::?_.90' (Di)yon 1 .. CL. e'ev.'" 2~).2()' (Doyon 14) MPG-16\LI L ~ ~ V , V i.... .... .... .... .... .... .... ~ i ~ Y ~ ¡ ~ I ~D , -4 ; I ....li.1 II i ~~S t ¡ ···---i r I ~~_:j ~¢ 0(, I . , ----¡ ~ ---¡ ~ ~ ~ (üûJ ~ ~ ª ~ ~ Cameo 2-7IB" x 1" wI BK latch side pocket KBMM-2 GLM .. Cameo 2-718" x 1" wI BK latch sidepocket KBMM-2 GLM 2-718" HES XN-Nipple 2.313" bore (2.250"no-go) Centrìlìft GC2200 ESP GPMTAR 1:1 122 stages Centrdt tandem gas sep. GRSFTXAR Centrdt tandem seal section GSB3DBUTILH6PFS GSB3DBL TH6 Centrílíft Kfv1H 562 series 171 hp. motor, 2390 v!44 amp Centrilift Pump mate sensor 6 Fin Motor centriiizer Baker Hook Wall Hanger inside 7" Window 5,643' ~akerHOOk Wall . Hanger outside 7" Window 5.600' . 61/8" Hole td @ 10,030' 103 jts. - 4112" Slotted Liner 12.6# L·BO IBT (5,711'- 9,947') OA Upper Lateral Baker Tie Back Sleeve 5,775' Baker ZXP liner Top Packer 5,782' Baker 7-518" x 5-112" HMC Liner Hanger 5,788' ¿ 7 51B" Halliburton Float Collar 6,175'\ 7 SIB" Halliburton Float Shoe 6,260' ~ DATE REV. BY COMMENTS Drilled & Completed Doyon 14 02/03/04 MOO ~n/ml " ",., I 10S' I 15,255'1 15,365'1 15,408' I 15,428' 1 15,433' 1 15,447'1 1 5,462'1 I 5,468'1 I f Rat Hole 40' ~ Btm Baker 4 112" Guide Shoe 9,990' ... OB Lower Lateral 76 jts. ·4112", 12.6# L-80, IBT Slotted Liner (6,054'· 8.976') ~ 6 11B" Hole td @ 9,561' Btm Baker 4 112" Roat Shoe 8.978' ~ Rat Hole .... 583' MILNE POINT UNIT WELL G-16\\..J API NO: 50-029-23189-60 L1 API NO: 50-029-23189-00 BP EXPLORATION (AK) BP EXPLORATION Leak-Off Test Summary Legal Name: MPG-16 Common Name: MPG-16 Test Date 1123/2004 1/26/2004 Test Type Test Depth (TMD) .....-.--.-..---..----- FIT 2,526.0 (ft) FIT 6,260.0 (ft) Test Depth (TVD) 2,465.0 (ft) 4,391.0 (ft) AMW 8.90 (ppg) 9.00 (ppg) Surface Pressure -..---.----..- 350 (psi) 480 (psi) Leak Off Pressure (BHP) .--..--". 1,490 (psi) 2,533 (psi) Page 1 of 1 EMW ...--"-- 11.63 (ppg) 11.10 (ppg) e e Printed: 2/9/2004 9: 1 0:21 AM . . &03-&\1 17-Feb-04 AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPG-16L 1 Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 5,646.16' MD 5,648.00' MD 10,030.00 I MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED ~1!\[~ 1 6 2004 i\;n~~aOì! &, Gas Cons. Commitalon Ai1000rage ~~~\\\~ DEFINITI E Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPG MPG-16L1 e Job No. AKZZ2878275, Surveyed: 1 February, 2004 Survey Report 9 February, 2004 Your Ref: API 500292318960 Surface Coordinates: 6014425.88 N, 557159.71šE (70027'00.1771" N, 149032'01.1652" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Surface Coordinates relative to Project H Reference: 1014425.88 N, 57159.78 E (Grid) Surface Coordinates relative to Structure Reference: 2693.37 N, 783.27 E (True) Kelly Bushing Elevation: 62.90ft above Mean Sea Level Kelly Bushing Elevation: 62.90ft above Project V Reference Kelly Bushing Elevation: 62. 90ft above Structure Reference SI::JE5!............y-'su:r, OFtfLL..ING stSFtvn::ss A Halliburton Company Survey Ref: svy1339 Halliburton Sperry-Sun Survey Report for Milne Point MPG - MPG-16L 1 Your Ref: API 500292318960 Job No. AKZZ2878275, Surveyed: 1 February, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (OI100ft) 5646.16 72.060 84.680 4224.24 4287.14 66.04 N 2876.51 E 6014513.98 N 560035.70 E 2863.12 Tie On Point - 5648.00 72.160 84.680 4224.80 4287.70 66.20 N 2878.26 E 6014514.16 N 560037.44 E 5.435 2864.87 Window Point 5701.18 80.260 85.330 4237.47 4300.37 . 70.69 N 2929.67 E 6014519.04 N 560088.82 E 15.277 2916.44 5749.48 82.070 85.920 4244.89 4307.79 74.33 N 2977.25 E 6014523.05 N 560136.37 E 3.937 2964.12 5797.19 82.390 86.500 4251.34 4314.24 77.46 N 3024.42 E 6014526.53 N 560183.52 E 1.379 3011.32 e 5845.18 84.380 87.080 4256.86 4319.76 80.13 N 3072.01 E 6014529.57 N 560231.09 E 4.317 3058.88 5893.56 85.430 87.670 4261.16 4324.06 82.33 N 3120.15 E 6014532.14 N 560279.21 E 2.487 3106.93 5943.19 85.740 88.280 4264.98 4327.88 84.08 N 3169.60 E 6014534.27 N 560328.64 E 1.375 3156.22 5989.29 86.970 88.840 4267.91 4330.81 85.24 N 3215.59 E 6014535.78 N 560374.62 E 2.931 3202.01 6038.62 86.170 89.440 4270.86 4333.76 85.98 N 3264.83 E 6014536.90 N 560423.85 E 2.026 3250.97 6085.44 88.210 90.010 4273.16 4336.06 86.20 N 3311.59E 6014537.48 N 560470.61 E 4.524 3297.41 6134.03 87.530 89.160 4274.96 4337.86 86.55.N 3360.14 E 6014538.20 N 560519.16 E 2.239 3345.64 6180.12 85.860 88.190 4277.62 4340.52 87.62 N 3406.14 E 6014539.62 N 560565.15 E 4.188 3391.43 6227.85 91.230 90.400 4278.83 4341.73 88.20 N 3453.83 E 6014540.57 N 560612.83 E 12.165 3438.84 6276.43 90.800 89.570 4277.97 4340.87 88.21 N 3502.40 E 6014540.96 N 560661.40 E 1.924 3487.05 6325.05 90.190 89.980 4277 .55 4340.45 88.41 N 3551.02 E 6014541.52 N 560710.02 E 1.512 3535.33 6374.57 90.250 90.360 4277 .36 4340.26 88.26 N 3600.54 E 6014541.75 N 560759.54 E 0.777 3584.46 6422.94 89.940 90.140 4277.28 4340.18 88.05 N 3648.91 E 6014541.91 N 560807.91 E 0.786 3632.44 6470.57 90.370 88.840 4277.15 4340.05 88.47 N 3696.54 E 6014542.70 N 560855.53 E 2.875 3679.77 6523.72 90.430 89.170 4276.78 4339.68 89.39 N 3749.68 E 6014544.03 N 560908.66 E 0.631 3732.62 6566.53 89.570 88.690 4276.78 4339.68 90.19 N 3792.48 E 6014545.16 N 560951.46 E 2.301 3775.20 6616.49 89.070 88.370 4277.38 4340.28 91.48 N 3842.42 E 6014546.82 N 561001.38 E 1.188 3824.93 e 6662.69 89.750 91.030 4277.85 4340.75 91.72 N 3888.61 E 6014547.42 N 561047.57 E 5.942 3870.80 6713.54 90.430 90.970 4277.77 4340.67 90.83 N 3939.45 E 6014546.92 N 561098.42 E 1.342 3921.16 6758.14 89.690 91.820 4277.72 4340.62 89.74 N 3984.04 E 6014546.18 N 561143.01 E 2.527 3965.28 6810.63 89.200 91.040 4278.23 4341.13 88.43 N 4036.51 E 6014545.27 N 561195.49 E 1.755 4017.20 6854.76 88.640 90.260 4279.06 4341.96 87.93 N 4080.63 E 6014545.11 N 561239.61 E 2.176 4060.93 6905.62 88.330 89.790 4280.41 4343.31 87.91 N 4131.47 E 6014545.48 N 561290.46 E 1.107 4111.39 6950.32 87.040 88.610 4282.21 4345.11 88.53 N 4176.13 E 6014546.44 N 561335.11 E 3.910 4155.79 7001.17 86.360 88.490 4285.14 4348.04 89.82 N 4226.88 E 6014548.12 N 561385.84 E 1.358 4206.32 7046.43 87.040 89.160 4287.75 4350.65 90.75 N 4272.05 E 6014549.39 N 561431.01 E 2.107 4251.27 7096.81 89.070 92.280 4289.46 4352.36 90.11 N 4322.39 E 6014549.14 N 561481.35 E 7.385 4301.15 7142.07 89.810 95.790 4289.90 4352.80 86.93 N 4367.53 E 6014546.30 N 561526.51 E 7.925 4345.57 7192.92 93.400 99.970 4288.48 4351.38 79.96 N 4417.86 E 6014539.73 N 561576.90 E 10.832 4394.68 7238.49 93.830 100.220 4285.60 4348.50 71.99 N 4462.64 E 6014532.10 N 561621.73 E 1.091 4438.14 9 February, 2004 - 16:26 Page 2 of 5 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPG - MPG-16L1 Your Ref: AP/500292318960 Job No. AKZZ2878275, Surveyed: 1 February, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) ¡01100ft) 7289.18 92.900 103.170 4282.63 4345.53 61.74N 4512.18 E 6014522.22 N 561671.35 E 6.092 4486.07 7334.40 92.840 102.860 4280.36 4343.26 51.56 N 4556.18 E 6014512.39 N 561715.43 E 0.697 4528.51 7385.08 93.270 101.800 4277.66 4340.56 40.76 N 4605.62 E 6014501.96 N 561764.96 E 2.254 4576.26 7430.73 94.510 100.760 4274.56 4337.46 31.85 N 4650.29 E 6014493.40 N 561809.69 E 3.542 4619.51 7480.27 92.780 101.010 4271.41 4334.31 22.51 N 4698.84 E 6014484.43 N 561858.30 E 3.528 4666.56 e 7526.79 90.740 104.500 4269.99 4332.89 12.25 N 4744.18 E 6014474.52 N 561903.72 E 8.686 4710.31 7576.82 90.620 105.110 4269.39 4332.29 0.53 S 4792.54 E 6014462.10 N 561952.19 E 1.243 4756.75 7622.31 91.240 104.920 4268.65 4331.55 12.32 S 4836.47 E 6014450.66 N 561996.21 E 1 .425 4798.92 7672.90 91.600 104.870 4267.40 4330.30 25.32 S 4885.35 E 6014438.03 N 562045.18 E 0.718 4845.85 7718.15 90.190 103.690 4266.69 4329.59 36.48 S 4929.19 E 6014427.21 N 562089.11 E 4.063 4888.01 7768.35 88.390 102.900 4267.31 4330.21 48.02 S 4978.04 E 6014416.04 N 562138.04 E 3.916 4935.08 7812.76 86.730 103.560 4269.21 4332.11 58.17 S 5021.23 E 6014406.22 N 562181.31 E 4.022 4976.71 7861.85 86.970 104.050 4271.90 4334.80 69.87 S 5068.83 E 6014394.89 N 562229.00 E 1.110 5022.53 7908.73 87.280 103.830 4274.25 4337.15 81.15 S 5114.27 E 6014383.96 N 562274.53 E 0.811 5066.26 7957.48 87.160 103.670 4276.62 4339.52 92.72 S 5161.57 E 6014372.75 N 562321.91 E 0.410 5111.80 8004.96 85.120 100.380 4279.82 4342.72 102.59 S 5207.89 E 6014363.23 N 562368.31 E 8.140 5156.57 8055.90 84.810 99.900 4284.29 4347.19 111.53 S 5257.84 E 6014354.68 N 562418.33 E 1.119 5205.06 8101.08 85.550 98.740 4288.08 4350.98 118.82 S 5302.27 E 6014347.73 N 562462.80 E 3.038 5248.27 8149.48 86.780 97.140 4291.32 4354.22 125.49 S 5350.10 E 6014341.43 N 562510.68 E 4.164 5294.92 8197.16 86.850 96.560 4293.97 4356.87 131.17 S 5397.36 E 6014336.12 N 562557.99 E 1.223 5341.15 8245.27 87.840 97.140 4296.20 4359.10 136.90 S 5445.08 E 6014330.75 N 562605.75 E 2.384 5387.81 8292.76 89.070 97.680 4297.48 4360.38 143.02 S 5492.15 E 6014324.99 N 562652.87 E 2.828 5433.78 e 8341.79 89.880 96.900 4297.93 4360.83 149.24 S 5540.78 E 6014319.14 N 562701.54 E 2.293 5481.29 8388.93 89.690 96.890 4298.10 4361.00 154.90 S 5587.58 E 6014313.84 N 562748.39 E 0.404 5527.05 8437.63 89.380 92.110 4298.50 4361.40 158.72 S 5636.12 E 6014310.39 N 562796.95 E 9.835 5574.76 8485.04 88.390 86.250 4299.42 4362.32 158.04 S 5683.49 E 6014311.43 N 562844.32 E 12.533 5621.87 8533.54 88.210 82.860 4300.86 4363.76 153.44 S 5731.74 E 6014316.40 N 562892.53 E 6.996 5670.32 8581.46 88.210 79.980 4302.36 4365.26 146.30 S 5779.10 E 6014323.91 N 562939.83 E 6.007 5718.19 8630.30 87.960 77.540 4303.99 4366.89 136.78 S 5826.97 E 6014333.79 N 562987.63 E 5.019 5766.87 8677.57 86.730 77.530 4306.18 4369.08 126.59 S 5873.08 E 6014344.34 N 563033.66 E 2.602 5813.87 8724.86 86.420 76.970 4309.01 4371.91 116.17 S 5919.12 E 6014355.11 N 563079.62 E 1.352 5860.84 8773.88 87.710 76.960 4311.52 4374.42 105.13 S 5966.81 E 6014366.52 N 563127.22 E 2.632 5909.52 8822.21 87.160 73.510 4313.68 4376.58 92.83 S 6013.49 E 6014379.18 N 563173.81 E 7.221 5957.35 8869.82 87.470 69.020 4315.91 4378.81 77.56 S 6058.52 E 6014394.79 N 563218.71 E 9.443 6003.91 8918.38 86.540 64.430 4318.45 4381.35 58.40 S 6103.05 E 6014414.29 N 563263.10 E 9.632 6050.44 9 February, 2004 - 16:26 Page 3 of 5 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPG - MPG-16L 1 Your Ref: AP/500292318960 Job No. AKZZ2878275, Surveyed: 1 February, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northin9s Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 8966.07 86.540 60.720 4321.33 4384.23 36.48 S 6145.30 E 6014436.53 N 563305.18 E 7.765 6095.05 9013.58 87.340 60.650 4323.87 4386.77 13.25 S 6186.67 E 6014460.08 N 563346.36 E 1.690 6138.94 9061.78 88.520 58.960 4325.61 4388.51 10.97 N 6228.30 E 6014484.62 N 563387.81 E 4.274 6183.21 9109.20 89.070 56.420 4326.60 4389.50 36.31 N 6268.36 E 6014510.27 N 563427.68 E 5.479 6226.06 9157.87 88.460 53.450 4327.65 4390.55 64.26 N 6308.18 E 6014538.52 N 563467.29 E 6.228 6269.00 e 9205.96 88.640 51.030 4328.87 4391.77 93.70 N 6346.19 E 6014568.25 N 563505.06 E 5.045 6310.30 9253.78 89.010 49.240 4329.85 4392.75 124.34 N 6382.88 E 6014599.17 N 563541.52 E 3.822 6350.46 9300.92 89.140 45.910 4330.61 4393.51 156.14 N 6417.67 E 6014631.23 N 563576.06 E 7.069 6388.86 9350.04 89.200 42.200 4331.32 4394.22 191.43 N 6451.82 E 6014666.79 N 563609.94 E 7.553 6427.05 9399.92 88.770 38.290 4332.21 4395.11 229.49 N 6484.03 E 6014705.09 N 563641.86 E 7.885 6463.67 9446.13 91.050 35.660 4332.28 4395.18 266.40 N 6511.82 E 6014742.21 N 563669.37 E 7.532 6495.75 9495.81 92.900 31.590 4330.57 4393.47 307.73 N 6539.31 E 6014783.76 N 563696.54 E 8.994 6528.07 9541.83 94.510 27.680 4327.59 4390.49 347.64 N 6562.01 E 6014823.84 N 563718.93 E 9.172 6555.47 9592.44 95.010 23.070 4323.39 4386.29 393.19 N 6583.62 E 6014869.56 N 563740.19 E 9.131 6582.47 9638.41 93.830 18.970 4319.85 4382.75 435.97 N 6600.06 E 6014912.46 N 563756.30 E 9.255 6603.99 9688.14 90.560 15.380 4317.94 4380.84 483.43 N 6614.72 E 6014960.03 N 563770.60 E 9.760 6624.33 9734.36 86.790 12.960 4319.01 4381.91 528.22 N 6626.03 E 6015004.91 N 563781.57 E 9.691 6641.02 9784.44 86.420 9.000 4321.98 4384.88 577.29 N 6635.55 E 6015054.04 N 563790.71 E 7.928 6656.45 9830.47 82.190 9.100 4326.54 4389.44 622.51 N 6642.76 E 6015099.32 N 563797.57 E 9.192 6669.11 9880.52 82.690 9.560 4333.13 4396.03 671.47 N 6650.80 E 6015148.34 N 563805.23 E 1.352 6683.06 9926.61 88.950 9.420 4336.49 4399.39 716.78 N 6658.37 E 6015193.71 N 563812.46 E 13.585 6696.10 9963.44 89.140 10.200 4337.10 4400.00 753.07 N 6664.65 E 6015230.05 N 563818.46 E 2.179 6706.75 e vi 0030.00 89.140 10.200 4338.10 ~ 4401.00 818.57 N 6676.43 E 6015295.63 N 563829.74 E 0.000 6726.43 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 83.000° (True). Magnetic Declination at Surface is 25.0340 (20-Jan-04) Based upon Minimum Curvature type calculations, at a Measured Depth of 10030.0Oft., The Bottom Hole Displacement is 6726.43ft., in the Direction of 83.0100 (True). 9 February, 2004 - 16:26 Page 4 of5 DrillQuest 3.03.05.005 · .. Halliburton Sperry-Sun Survey Report for Milne Point MPG - MPG-16L 1 Your Ref: AP/500292318960 Job No. AKZZ2878275, Surveyed: 1 February, 2004 BPXA Milne Point Unit Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings ~ ~) ~) Comment 5646.16 5648.00 10030.00 4287.14 4287.70 4401.00 66.04 N 66.20 N 818.57 N 2876.51 E 2878.26 E 6676.43 E Tie On Point Window Point Projected Survey e Survey tool program for MPG-16L 1 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 639.00 0.00 639.00 637.31 10030.00 637.31 Tolerable Gyro (MPG-16PB1) 4401.00 AK-6 BP _IFR-AK (MPG-16PB1) e 9 February, 2004 - 16:26 Page 50f5 DrillQuest 3.03.05.005 . AOGCC Howard Okland 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . @Cì,3-e t ( 17-Feb-04 Re: Distribution of Survey Data for Well MPG-16L 1 Y\I\ w~ Dear Dear Sir/Madam: Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 5,646.16' MD 5,648.00' MD 10,030.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ~'K~ i\\ ~ RECEIVED ¡ ,1 6 2004 AíaskaOiI & Gas Cons.Commliof! AnœorØge Halliburton Sperry-Sun Milne Point Unit BPXA Milne Point MPG MPG-16L1 MWD e Job No. AKMW2878275, Surveyed: 1 February, 2004 Survey Report 9 February, 2004 Your Ref: API 500292318960 Surface Coordinates: 6014425.88 N, 557159.78 E (70027'00.1771° N, 149032'01.1652° W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 e Surface Coordinates relative to Project H Reference: 1014425.88 N, 57159.78 E (Grid) Surface Coordinates relative to Structure Reference: 2693.37 N, 783.27 E (True) Kelly Bushing Elevation: 62.90ft above Mean Sea Level Kelly Bushing Elevation: 62.90ft above Project V Reference Kelly Bushing Elevation: 62.90ft above Structure Reference spal"""l"""Y-sul'1 ORfLL.I\fG SERVlteS A Halliburton Company Survey Ref: svy1340 Halliburton Sperry-Sun Survey Report for Milne Point MPG - MPG-16L1 MWD Your Ref: AP/500292318960 Job No. AKMW2878275, Surveyed: 1 February, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) ¡01100ft) 5646.16 72.060 83.180 4224.31 4287.21 65.87 N 2874.79 E 6014513.79 N 560033.98 E 2861.39 Tie On Point 5648.00 72.160 84.680 4224.87 4287.77 66.05 N 2876.53 E 6014513.99 N 560035.72 E 77.770 2863.14 Window Point 5701.18 80.260 85.330 4237.54 4300.44 70.54 N 2927.94 E 6014518.87 N 560087.09 E 15.277 2914.71 5749.48 82.070 85.920 4244.95 4307.85 74.18 N 2975.52 E 6014522.88 N 560134.65 E 3.937 2962.39 5797.19 82.390 86.500 4251.40 4314.30 77.30 N 3022.69 E 6014526.36 N 560181.79 E 1.379 3009.58 e 5845.18 84.380 85.900 4256.93 4319.83 80.46 N 3070.26 E 6014529.89 N 560229.33 E 4.329 3057.18 5893.56 85.430 87.500 4261.23 4324.13 83.24 N 3118.36 E 6014533.03 N 560277.41 E 3.945 3105.26 5943.19 85.740 85.920 4265.05 4327.95 86.08 N 3167.76 E 6014536.25 N 560326.79 E 3.235 3154.64 5989.29 86.970 84.960 4267.98 4330.88 89.73 N 3213.62 E 6014540.26 N 560372.62 E 3.382 3200.60 6038.62 86.170 87.660 4270.93 4333.83 92.90 N 3262.76 E 6014543.81 N 560421.73 E 5.699 3249.76 6085.44 88.210 89.230 4273.23 4336.13 94.17 N 3309.50 E 6014545.43 N 560468.46 E 5.496 3296.31 6134.03 87.530 88.360 4275.03 4337.93 95.19 N 3358.04 E 6014546.83 N 560516.99 E 2.272 3344.61 6180.12 85.860 87.050 4277.69 4340.59 97.03 N 3404.02 E 6014549.02 N 560562.95 E 4.602 3390.47 6227.85 91.230 89.280 4278.90 4341.80 98.56 N 3451.69 E 6014550.91 N 560610.61 E 12.181 3437.97 6276.43 90.800 88.230 4278.04 4340.94 99.62 N 3500.25 E 6014552.34 N 560659.16 E 2.335 3486.30 6325.05 90.190 88.360 4277.62 4340.52 101.06 N 3548.84 E 6014554.16 N 560707.74 E 1.283 3534.71 6374.57 90.250 89.190 4277.43 4340.33 102.12 N 3598.35 E 6014555.60 N 560757.24 E 1.680 3583.98 6422.94 89.940 90.140 4277.35 4340.25 102.40 N 3646.72 E 6014556.25 N 560805.61 E 2.066 3632.02 6470.57 90.370 89.110 4277.22 4340.12 102.72 N 3694.35 E 6014556.93 N 560853.23 E 2.343 3679.33 6523.72 90.430 89.610 4276.85 4339.75 103.31 N 3747.49 E 6014557.93 N 560906.37 E 0.947 3732.15 6566.53 89.570 87.830 4276.85 4339.75 104.27 N 3790.29 E 6014559.21 N 560949.16 E 4.618 3774.75 6616.49 89.070 87.440 4277.45 4340.35 106.33 N 3840.20 E 6014561.66 N 560999.06 E 1.269 3824.54 e 6662.69 89.750 89.360 4277.92 4340.82 107.62 N 3886.38 E 6014563.30 N 561045.22 E 4.409 3870.53 6713.54 90.430 89.400 4277.84 4340.74 108.17 N 3937.23 E 6014564.24 N 561096.06 E 1.340 3921.06 6758.14 89.690 90.260 4277.79 4340.69 108.30 N 3981.83 E 6014564.72 N 561140.66 E 2.544 3965.35 6810.63 89.200 90.260 4278.30 4341 .20 108.06 N 4034.31 E 6014564.88 N 561193.15 E 0.934 4017.41 6854.76 88.640 89.200 4279.13 4342.03 108.27 N 4078.43 E 6014565.43 N 561237.26 E 2.716 4061.23 6905.62 88.330 88.760 4280.48 4343.38 109.17 N 4129.27 E 6014566.72 N 561288.09 E 1.058 4111.79 6950.32 87.040 87.640 4282.28 4345.18 110.58 N 4173.91 E 6014568.47 N 561332.72 E 3.820 4156.27 7001.17 86.360 87.200 4285.21 4348.11 112.86 N 4224.62 E 6014571.14 N 561383.41 E 1.592 4206.89 7046.43 87.040 88.140 4287.82 4350.72 114.70N 4269.77 E 6014573.32 N 561428.54 E 2.561 4251.92 7096.81 89.070 90.990 4289.53 4352.43 115.08 N 4320.11 E 6014574.09 N 561478.88 E 6.942 4301.93 7142.07 89.810 94.680 4289.97 4352.87 112.84 N 4365.31 E 6014572.20 N 561524.09 E 8.315 4346.52 7192.92 93.400 98.720 4288.55 4351.45 106.92 N 4415.77 E 6014566.66 N 561574.60 E 10.625 4395.88 7238.49 93.830 99.510 4285.67 4348.57 99.71 N 4460.67 E 6014559.80 N 561619.56 E 1.971 4439.58 9 February, 2004 - 16:27 Page 2 of5 DrillQuest 3.03.05.005 Halliburton Sperry-Sun Survey Report for Milne Point MPG - MPG-16L 1 MWD Your Ref: AP/500292318960 Job No. AKMW2878275, Surveyed: 1 February, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (01100ft) 7289.18 92.900 102.480 4282.70 4345.60 90.06 N 4510.34 E 6014550.53 N 561669.30 E 6.130 4487.70 7334.40 92.840 102.430 4280.43 4343.33 80.32 N 4554.44 E 6014541.13 N 561713.47 E 0.173 4530.28 7385.08 93.270 101.470 4277.73 4340.63 69.84 N 4603.95 E 6014531.03 N 561763.06 E 2.073 4578.15 7430.73 94.510 100.780 4274.63 4337.53 61.05 N 4648.64 E 6014522.59 N 561807.82 E 3.107 4621.43 7480.27 92.780 101.420 4271.48 4334.38 51.53 N 4697.15 E 6014513.44 N 561856.40 E 3.723 4668.42 e 7526.79 90.740 104.450 4270.06 4332.96 41.13 N 4742.46 E 6014503.38 N 561901.79 E 7.849 4712.13 7576.82 90.620 104.750 4269.46 4332.36 28.52 N 4790.87 E 6014491.14 N 561950.29 E 0.646 4758.64 7622.31 91.240 104.460 4268.72 4331.62 17.05 N 4834.89 E 6014480.01 N 561994.40 E 1.505 4800.93 7672.90 91.600 104.940 4267.47 4330.37 4.21 N 4883.81 E 6014467.55 N 562043.41 E 1.186 4847.92 7718.15 90.190 104.110 4266.76 4329.66 7.13 S 4927.60 E 6014456.54 N 562087.29 E 3.616 4890.01 7768.35 88.390 103.210 4267.39 4330.29 18.99 S 4976.38 E 6014445.06 N 562136.16 E 4.009 4936.97 7812.76 86.730 103.680 4269.28 4332.18 29.30 S 5019.53 E 6014435.08 N 562179.39 E 3.885 4978.54 7861.85 86.970 104.320 4271.97 4334.87 41.16 S 5067.09 E 6014423.59 N 562227.04 E 1.391 5024.30 7908.73 87.280 103.980 4274.32 4337.22 52.61 S 5112.49E 6014412.49 N 562272.52 E 0.981 5067.97 7957.48 87.160 103.960 4276.69 4339.59 64.36 S 5159.74 E 6014401.10 N 562319.86 E 0.250 5113.44 8004.96 85.120 100.720 4279.89 4342.79 74.48 S 5206.01 E 6014391.33 N 562366.21 E 8.050 5158.13 8055.90 84.810 100.200 4284.36 4347.26 83.70 S 5255.91 E 6014382.50 N 562416.18 E 1.185 5206.53 8101.08 85.550 99.050 4288.15 4351.05 91.22 S 5300.30 E 6014375.31 N 562460.62 E 3.019 5249.67 8149.48 86.780 97.370 4291.39 4354.29 98.12 S 5348.09 E 6014368.78 N 562508.47 E 4.296 5296.27 8197.16 86.850 96.900 4294.04 4356.94 104.03 S 5395.33 E 6014363.23 N 562555.75 E 0.995 5342.43 8245.27 87.840 95.990 4296.27 4359.17 109.43 S 5443.08 E 6014358.21 N 562603.54 E 2.794 5389.17 8292.76 89.070 96.500 4297.55 4360.45 114.59 S 5490.27 E 6014353.40 N 562650.77 E 2.804 5435.38 e 8341.79 89.880 95.630 4298.00 4360.90 119.77 S 5539.02 E 6014348.60 N 562699.56 E 2.424 5483.14 8388.93 89.690 95.770 4298.17 4361.07 124.45 S 5585.93 E 6014344.28 N 562746.50 E 0.501 5529.13 8437.63 89.380 91.450 4298.57 4361.47 127.52 S 5634.52 E 6014341.58 N 562795.11 E 8.893 5576.98 8485.04 88.390 85.600 4299.49 4362.39 126.30 S 5681.89 E 6014343.16 N 562842.47 E 12.512 5624.14 8533.54 88.210 82.080 4300.93 4363.83 121.10 S 5730.08 E 6014348.74 N 562890.62 E 7.264 5672.61 8581 .46 88.210 79.210 4302.43 4365.33 113.31 S 5777.33 E 6014356.88 N 562937.81 E 5.986 5720.46 8630.30 87.960 76.770 4304.06 4366.96 103.16 S 5825.07 E 6014367.40 N 562985.47 E 5.019 5769.08 8677.57 86.730 76.750 4306.25 4369.15 92.34 S 5871.03 E 6014378.57 N 563031.35 E 2.602 5816.02 8724.86 86.420 76.070 4309.08 4371.98 81.25 S 5916.92 E 6014390.01 N 563077.15 E 1.578 5862.91 8773.88 87.710 76.270 4311.59 4374.49 69.55 S 5964.45 E 6014402.08 N 563124.59 E 2.663 5911.52 8822.21 87.160 72.660 4313.75 4376.65 56.62 S 6010.96 E 6014415.37 N 563171.00 E 7.548 5959.26 8869.82 87.470 68.090 4315.98 4378.88 40.65 S 6055.75 E 6014431.68 N 563215.66 E 9.610 6005.65 8918.38 86.540 63.710 4318.52 4381.42 20.85 S 6100.00 E 6014451.81 N 563259.76 E 9.209 6051.99 9 February, 2004 - 16:27 Page 3 of 5 DrillQuest 3.03.05.005 · ' Halliburton Sperry-Sun Survey Report for Milne Point MPG - MPG-16L 1 MWD Your Ref: AP/500292318960 Job No. AKMW2878275, Surveyed: 1 February, 2004 BPXA Milne Point Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°11 DOft) 8966.07 86.540 60.250 4321.40 4384.30 1.50 N 6142.02 E 6014474.49 N 563301.61 E 7.242 6096.42 9013.58 87.340 60.140 4323.94 4386.84 25.09 N 6183.19E 6014498.39 N 563342.59 E 1.700 6140.15 9061.78 88.520 58.530 4325.68 4388.58 49.65 N 6224.62 E 6014523.27 N 563383.83 E 4.140 6184.27 9109.20 89.070 56.1 00 4326.67 4389.57 75.25 N 6264.52 E 6014549.18 N 563423.53 E 5.253 6226.99 9157.87 88.460 53.080 4327.72 4390.62 103.44 N 6304.17 E 6014577.67 N 563462.97 E 6.329 6269.78 e 9205.96 88.640 50.830 4328.94 4391.84 133.07 N 6342.03 E 6014607.59 N 563500.60 E 4.692 6310.97 9253.78 89.010 48.830 4329.92 4392.82 163.91 N 6378.56 E 6014638.70 N 563536.89 E 4.252 6350.99 9300.92 89.140 45.600 4330.68 4393.58 195.92 N 6413.14 E 6014670.98 N 563571.23 E 6.857 6389.22 9350.04 89.200 42.110 4331.39 4394.29 231.33 N 6447.17 E 6014706.65 N 563604.98 E 7.105 6427.30 9399.92 88.770 38.320 4332.28 4395.18 269.41 N 6479.36 E 6014744.97 N 563636.89 E 7.646 6463.90 9446.13 91.050 35.720 4332.35 4395.25 306.29 N 6507.18 E 6014782.08 N 563664.42 E 7.483 6496.01 9495.81 92.900 31.510 4330.64 4393.54 347.63 N 6534.66 E 6014823.62 N 563691.58 E 9.251 6528.32 9541.83 94.510 27.860 4327.66 4390.56 387.52 N 6557.40 E 6014863.68 N 563714.02 E 8.653 6555.75 9592.44 95.010 23.440 4323.46 4386.36 432.97 N 6579.23 E 6014909.30 N 563735.49 E 8.759 6582.95 9638.41 93.830 19.300 4319.92 4382.82 475.64 N 6595.92 E 6014952.10 N 563751.86 E 9.339 6604.73 9688.14 90.560 15.610 4318.01 4380.91 523.04 N 6610.82 E 6014999.61 N 563766.40 E 9.910 6625.29 9734.36 86.790 13.330 4319.08 4381.98 567.77 N 6622.37 E 6015044.42 N 563777.60 E 9.531 6642.20 9784.44 86.420 9.320 4322.05 4384.95 616.78 N 6632.18 E 6015093.51 N 563787.04 E 8.027 6657.91 9830.47 82.190 9.410 4326.61 4389.51 661.96 N 6639.63 E 6015138.74 N 563794.14 E 9.192 6670.82 9880.52 82.690 10.210 4333.20 4396.10 710.85 N 6648.09 E 6015187.70 N 563802.22 E 1.873 6685.16 9926.61 88.950 9.830 4336.56 4399.46 756.09 N 6656.08 E 6015233.00 N 563809.87 E 13.607 6698.61 9963.44 89.140 10.530 4337.17 4400.07 792.33 N 6662.59 E 6015269.29 N 563816.10 E 1.969 6709.49 e 10030.00 89.140 10.530 4338.17 4401.07 ./ 857.77 N 6674.75 E 6015334.82 N 563827.76 E 0.000 6729.54 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 83.000° (True). Magnetic Declination at Surface is 25.034° (20-Jan-04) Based upon Minimum Curvature type calculations, at a Measured Depth of 10030.00ft., The Bottom Hole Displacement is 6729.64ft., in the Direction of 82.677° (True). 9 February, 2004 - 16:27 Page 4 of 5 DrillQuest 3.03.05.005 6 Halliburton Sperry-Sun Survey Report for Milne Point MPG - MPG-16L 1 MWD Your Ref: AP/500292318960 Job No. AKMW2878275, Surveyed: 1 February, 2004 BPXA Milne Point Unit Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 5646.16 5648.00 10030.00 4287.21 4287.77 4401.07 65.87 N 66.05 N 857.77 N 2874.79 E 2876.53 E 6674.75 E Tie On Point Window Point Projected Survey ,./ e Survey tool program for MPG-16L 1 MWD From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) 0.00 639.00 0.00 639.00 637.31 10030.00 637.31 Tolerable Gyro (MPG-16PB1 MWD) 4401.07 MWD Magnetic (MPG-16PB1 MWD) e 9 February, 2004· 16:27 Page 50f5 DrillQuest 3.03.05.005 . . 803-() \ \ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 March 2, 2004 RE: MWDFonnationEvaluationLogs MPG-16Ll, AK-MW-2878275 1 LIS fonnatted Disc with verification listing. API#: 50-029-23189-60 J ~ L..\ to 8' PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: Signed~~~_.~\-a ~~ RECEIVED ¡ ~ ·1 0 0t'j:'\ A r·', I! ~ /1.1 ~ j:"1. ¡ ~ 1·'" >,"_ _ \J J ...... '. n'l '" f...·· ,t'",·.., "mm'-íol1 ß~~1&~i{1?1 ~!¡! ,~ yQ5 uunlJ,l".,o. ¡IWI ! ,1 ~;'\{>'ri,<¡ra(1e lJ i'Ì'".·~'J""'·. /1 RBDUS Dr" MAR ~ () ,nnh - ~~!Æ~E (illJ !Æ~!Æ~~~!Æ e .-'1¡ASIiA OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Matt Green Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, Alaska 99519 Re: Milne Point Unit MPG-16L1 BP Exploration (Alaska), Inc. Permit No: 203-211 Surface Location: 1990; NSL, 3443' WEL, Sec. 27, T13N, RlOE, UM Bottomhole Location: 2810' NSL, 2022' WEL, Sec.26, T13N, R10E, UM Dear Mr. Green: Enclosed is the approved application for permit to redrill the above development well. This permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, BY ORDER OF THE COMMISSION DATED this-1l:- day of December, 2003 cc: Department ofFish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. o Drill III Redrill 1 a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1990' NSL, 3443' WEL, SEC. 27, T13N, R10E (As Staked) Top of Productive Horizon: 2078' NSL, 4264' WEL, SEC. 26, T13N, R10E, (OA) Total Depth: 2810' NSL, 2022' WEL, SEC. 26, T13N, R10E, (OA) 4b. Location of Well (State Base Plane Coordinates): Surface: X-557160' y-6014426 Zone-ASP4 16. Deviated Wells: Kickoff Depth ih§Pr'ogràm Size Casing 4-1/2" . STATE OF ALASKA . ALASKA ._ AND GAS CONSERVATION CO~SSION PERMIT TO DRILL 20 MC 25.005 1b. Current Well Class 0 Exploratory o Stratigraphic Test 0 Service 5. Bond: 1m Blanket 0 Single Well Bond No. 2S100302630-277 6. Proposed Depth: MD 10070' TVD 4424' 7. Property Designation: .£ ADL025518, ð¡Çf)¿, 8. Land Use Permit: III Development Oil 0 Multiple Zone o Development Gas III Single Zone 11. Well Name and Number: MPG-16L 1 12. Field / Pool(s): Milne Point Unit / Schrader Bluff 13. Approximate Spud Date: 01/01/04 9. Acres in Property: 2560 14. Distance to Nearest Property: 8950' Hole 6-1/8" 10. KB Elevation 15. Distance to Nearest Well Within Pool (Height above GL): Plann:~:'BE = feet 200' from Schrader Penetration Sand in MPG-06 17. Anticipated pressure (see 20 AAC 25.035) 5627 ft Maximum Hole Angle 900 Max. Downhole Pressure: 1966 psig. Max. Surface Pressure: 1545 psig Sèttih§Deptli/' ..../ QUåntity' bfCèmer'lt Top Bottom (c.f. or sacks) Grade Coupling Length MD TVD MD TVD (including stage data) L-80 BTC 4443' 5627' 4284' 10070' 4424' Uncemented Slotted Liner Weight 12.6# PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD 10077' 4489' NIA 10077' 4489' Structural Conductor 112' 20" 260 sx Arctic Set (Approx.) 112' 112' Surface 2490' 10-3/4" 469 sx PF 'L', 261 sx Class 'G' 2490' 2434' Intermediate Production 5882' 7-5/8" 567 sx Class 'G' 5882' 4346' Liner 4295' 4-1/2" Uncemented Slotted Liner 5782' - 10077' 4326' - 4489' 20. Attachments _ Filing Fee 0 BOP Sketch o Property Plat 0 Diverter Sketch IPerfOration Depth TVD (ft): NIA 1m Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis o Seabed Report 1m Drilling Fluid Program 1m 20 AAC 25.050 Requirements Perforation Depth MD (ft): NIA 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Matt Green /I / Title Drilling Engineer Si~.natur: .......... .... ..... ............!~~g"~ Phone 564-5581 7·f:: Commission Use Only Permit To Drill I API Number 89 0 I Permit APproval".! ~ "'. se.e coverlett. erfor Numb'er" "';T\3-2,'/ 50_0-7"'-:;- '73 / -.~ ~ I' ¡ .AJ-oI £.-7 ;6- Date: (,11 .... 'ì other requirements Conditions of Approval: Samples Required 0 Yes No Mud Log Required t: ,)~eV~o) Hydrogen Sulfide Measures 0 Yes ]:K.No Directional Survey Required p?'yes U~ Other: DEC '- 3 2003 Date: Contact Matt Green, 564-5581 Date 1, l2fk.,O.3 Prepared By Name/Number: Sondra Stewman, 564-4750 Approved Bv: Form 10-401 Revised 3/2003 Original Slgn~ 6y sarah palin OR\G\NAL COMMISSIONER Alaska Oil &Gas Cons. Commission BY ORDER OF Anchorage) I II. THE COMMISSION Date IJ.; /:J./05 Submit In Duplicate e Milne P. MPG-16 L1 Well Permit I Well Name: I MPG-16 L 1 Drill and Complete Plan Summary I Type of Well (service I producer I injector): I Multi Lateral Producer "OA" & "OB" Surface Location: 3289' FNL, (1990' FSL), 3443' FEL, (1836' FWL), SEC. 27, T13N, R10E E=557159.63 N=6014425.59 3201' FNL, (2078' FSL), 4264' FEL, (1015' FWL), SEC. 26, T13N, R10E E=561617 N=6014549 Z=4295'TVD 2469' FNL, (2810' FSL), 2022' FEL, (3257' FWL), SEC. 26, T13N, R10E E=563852 N=6015300 Z=4360' TVD 3226' FNL, (2053' FSL), 335' FEL, (4944' FWL), SEC. 27, T13N, R10E E=560267 N=6014513 Z=4282' TVD 2469' FNL, (2810' FSL), 2022' FEL, (3257' FWL), SEC. 26, T13N, R10E E=563852 N=6015300 Z=4425' TVD Target Location: TOP "OA" Target Location: BHL "OA" Well TD Target Location: TOP "OB" Target Location: BHL "OB" Well TD I AFE Number: I TBD I Estimated Start Date: 11-Jan-2004 I MD: 110,070 I I Well Design (conventional, slimhole, etc.): I Conventional Grass Roots ML Producer I TVD: 14,424 I I Rig: I Doyon 14 I I Operating days to complete: 114.3 I I Max Inc: 189 I I KOP: 15,6271 I KBE: 163.8 I I I I Objective: I Schrader Bluff OA & OB Sand Mud Program: 13.S-in Surface Hole Mud Properties: Spud - LSND Freshwater Mud Density (ppg) I Funnel Vis I YP HTHP pH API Filtrate I LG Solids 8.6 - 9.2 75 - 150 25 - 60 N/A 9.0 - 9.5 < 12 < 6.5 9.87S-in Intermediate Hole Mud Properties: LSND Freshwater Mud Density (ppg) PV I YP HTHP pH API Filtrate I LG Solids 8.8 - 9.2 10 - 20 25 - 30 10 - 11 9.0 - 9.5 < 6 < 15 6.12S-in Production Hole Mud Properties: KCI-CaC03 FloPro Density (ppg) PV I YP HTHP pH API Filtrate I MBT 9.0 - 9.2 10 - 20 25 - 30 10 - 11 9.0 - 9.5 < 6 < 7 LCM Restrictions: No Organic LCM products in the Schrader Bluff formation Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU lR. 1 e Milne P. MPG-16 L 1 Well Permit Cement Program: Casing 1 0.75-in 40-lb/ft L-80 BTC surface casing Size Basis 175% excess over gauge hole in permafrost interval. 40% excess over gauge hole below permafrost. Top of tail cement 500-ft MD above casing shoe. Total Cement Wash 20-bbl Water Spacer Vol: 401-bbl Spacer 50-bbl 10.3-lb/gal un-viscosified Alpha spacer Lead 347-bbl, 469-sx 10.7-lb/gal Permafrost L - 4.15 fe/sx (cement to surface) Tail 54-bbl, 261-sx 15.8-lb/gal Premium G - 1.15 ft;j/sx of tail at 1 Temp BHST ~ 55°F from SOR, BHCT 60°F estimated by Schlumberger Casing Size Basis 7.625-in 29.7-lb/ft L-80 BTC intermediate casing Top of lead cement 500-ft above top of Ugnu-sand. 0% excess over gauge. Top of tail cement 500-ft MD above top of N-sand. 40% excess over gauge. Total Cement Wash 5-bbl Water Vol: 124-bbl Spacer 30-bbl 10.3-lb/gal un-viscosified Alpha Spacer Tail 124-bbl, 567-sx 15.6-lb/gal Premium G - 1.15 fe/sx of tail at 3,654-ft Temp BHST ~ 80°F from SOR, BHCT 70°F estimated by Schlumberger Evaluation Program: 13.5-in Hole Section: Open Hole: MWD/GR, IFR/CASANDRA Cased Hole: N/A 9.875-in Hole Section: Open Hole: MWD/GRlRES, IFRlCASANDRA, Sidewall Cores Cased Hole: N/A 6.125-in Hole section: Open Hole: MWD/GRlRES, ABI/IFRlCASANDRA Cased Hole: N/ A 2 · Formation Markers Formation Tops Base Permafrost TUZC NA NB NC NE NF Top OA Base OA Top OB Base OB * Based on SS depths MOrkb (ft) 1902 4154 5177 5258 5320 5382 5505 5627 5769 5882 6326 TVDrkb (ft) 1864 3574 4084 4124 4154 4184 4239 4284 4324 4346 4374 Pore Pressure (psi) 1524 1608 1624 1636 1648 1669 1687 1703 1712 1723 Milne paMPG-16 L1 Well Permit Estimated EMW (Ib/gal)* 8.35 7.69 7.69 7.69 7.69 7.69 7.69 7.69 7.69 7.69 CasinglTubing Program Hole Size Csg/ WtlFt Grade Conn Length Top Bottom Tbg O.D. M D / TVDrkb MD / TVDrkb 42-in 20-in* 92# H-40 Welded 80' 0' 11 2' / 112' 13.5-in 10.75-in 45.5# L-80 BTC-M 2,490-ft 0' 2,490-ft / 2,434-ft 9.875-in 7.625-in 29.7# L-80 BTC-M 5,882-ft 0' 5,882-ft / 4,346-ft 6.125-in 4.5-in 12.6# L-80 BTC 4,1,95-ft 5,782-ft/ 10,077-ft/ OB Slotted 4,326-ft 4,489-ft 6.125-in 4.5-in 12.6# L-80 BTC 4,443-ft 5,627-ft / 1 0,070-ft / OA Slotted 4,284-ft 4,424-ft * The 20-in conductors are insulated. Recommended Bit Program BHA Hole Size Depth (MD) Bit Type 1 13.5-in O-ft - 2,490-ft Hughes MX-C1 2 9.875-in 2,490-ft - 5,882-ft Smith FGXiCPS 3 6.125-in 5,882-ft - TO Security FM2643 4 6.125-in 5,627-ft - TO Security FM2643 3 Nozzle/Flow rate 3-15 & 1-1 ° 3-15 & 1-1 ° 3-12 3-12 e Milne Pit MPG-16 L 1 Well Permit Well Control: Surface hole will be drilled with a diverter. Intermediate hole: · Maximum anticipated BHP: · Maximum surface pressure: Kick tolerance: · Planned completion fluid: 1,966-psi @ 4,202-ft TVDrkb - Top of "OA" 1 ,545-psi @ surface (Based on BHP and a full column of gas from TD @ 0.1-psi/ft) 3,500-psi. An FIT to 11.5-lb/gal will be made on the 10.75-in casing shoe. 89-bbl with 9.2-lb/gal mud. 9.7-lb/gal brine / 7.0-lb/gal Diesel (1 ,800-ft MD). · Planned BOP test pressure: · Integrity test: Drilling Hazards & Contingencies: Hydrates · Light to moderate hydrates were encountered on several of the previous G-Pad wells. No drilling problems related to the hydrates were reported. · Hydrates generally occur just below the Permafrost (+/- 1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for the possibility of shallow gas and/or hydrates. Use recommended practices for drilling hydrates. Increase mud wt; Maintain cool mud « 60 deg F); Limit ROP and reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well Program and Recommended Practices for specific information. · Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have experienced stuck pipe from this situation. Lost Circulation · We do not expect losses while drilling this well. · Offset wells encountered losses while running and cementing casing and only one well had losses while running a hole opener. Below is a list of the wells and the lost circulating problems associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Expected Pressures · It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be (7.69 Ib/gal EMW). In this well, the Schrader Bluff formation will be drilled with 9.1-lb/gal mud. 4 e Milne P.MPG-16 L1 Well Permit Pad Data Sheet · Please Read the G-Pad Data Sheet thoroughly. Breathing · N/A Hydrocarbons · Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Faults · NA Hydrogen Sulfide · MPG Pad is not designated as an H2S Pad. All G-Pad wells had <2-ppm H2S on the 2001 report. Anti-collision Issues · MPG-16 L 1 surface location is 5-ft from the abandoned MPG-06 wellbore and will parallel that well bore prior to the kick-off at 250-ft. ' Distance to Nearest Property · MPG-16 L 1 is 8,950-ft from the nearest Milne Point property line. Distance to Nearest Well Within Pool · MPG-16 L 1 is 200-ft from the Schrader-sand penetration in MPG-06. 5 e Milne P. MPG-16 L 1 Well Permit DRILL & COMPLETION PROCEDURE Pre-Rig Operations 1. The 20-in insulated conductor is installed 2. NU diverter Procedure 1. MI/RU Doyon 14 2. Function test diverter, PU 4.0-in drill pipe 3. Drill 13.5-in surface hole 4. Run and cement 1 O.75-in casing 5. ND diverter, install wellhead, NU BOPE and test 6. Drill 9.875-in intermediate hole 7. Run and cement 7.625-in casing 8. Set whipstock and mill window for OB 9. Drill 6.125-in OB horizontal production hole 10. Run 4.5-in slotted liner 11. Run whipstock and mill window for OA lateral 12. Drill 6.125-in OA horizontal production hole 13. Retrieve whipstock 14. Run 4.5-in slotted liner and hang off in 7.625-in casing 15. Displace drilling mud to brine 16. Run 4.5-in jet pump completion 17. ND BOPE / NU tree 18. Freeze protect well 19. RD/MO 6 TREE: Cameron 2-9/16" 5 . WELLHE¡AD: FMC Gen 5 11", 5M Tubing Head: FMC 11-in x 2.875-in ~HOPOSI=I.J COMPLcIIO~ . V ~-1 3 I KB. ELEV =63.8-11 I Cellar Box ELEV = 29.5-11 114' ... 20" 92 Iblll, H-40 Welded Insulated 10-3/4" 45.5#, L-80, BTC-M Casing Drift: 9.875 Casing 10: 9.950 Coupling 00: 11.75" Burst: 5,210 psi Collapse: 2,480 psi 2.875-in 6.5-lb/ft, L-80, 8rd, EUE Tubing ID: 2.441-in Tubing Capacity: 0.00579-bbllft Tensile (100%): 145-k.lbf Burst: 10,570-psi Collapse: 13,870-psi 7-5/8" 29.7#, L-80, BTC-M Casing Drift: 6.75 Casing 10: 6.875 Coupling 00: 11.75" Burst: 6,890 psi Collapse: 4,790 psi Window in 7-5/8" casing @ 5,627-ft MD Well Inclination @ Window = 71 Degrees 4.5-in liner top @ 5,732-ft MD (150-ft lap) 7.625" Casing Shoe @ 5,882-ft MD, 4,346-ft TVD Well Inclination @ Shoe = 81 Degrees DATE 2 Dee 2003 REV. BY MDG COMMENTS Level 3 Multi-Lateral, 4-1/2" Jet Pump Completion .... ~ .. \~ r- § ~~ "" ... 42" Hole 2.875-in x 1.0-in Gas Lift Mandrel @ 2,000-ft TVD 10-3/4"@ 2,490' MD, 2,434' TVDrkb 2 7/8" 'XU' Sliding Sleeve I I opens up (ID 2.313") 2-7/8" XN nipple I I (ID 2.205") Pump, 122 stg. GC2200 I I Tandem Gas Separator I I Tandem Seal Section I I GSB3 DB UT/L T IL H6 PFS AflaslHSN Motor, 114 HP KMH I 2330 volt, 30 amp 450 Series Phoenix MS1 5,500-ft I w/6 fin Centralizer 6.125-inOALateral 110,070-ft MDI -.... """-- ----- - - ...... - - - 9 - /b L { - -- 4.5-in Slotted Liner w/Hookwall hanger 9.875-in Hole 6.125-in 08 Lateral 10,076-ft MD I -- - -- - -- - - -- {z~-.!.. b _ 4.5-in Slotted Liner & Hanger Milne Point Unit WF : MPG-16 API NO: ~n \~-'¡:I," 011' "'''" / /"/ / ~;. ¡In:)II(·li::I· .....~.\;¡.\to v:)..~h-UI~I\l) / ~r"'1 1)11 ... l11I' : '(s.~ I.... \~~). ·1 H).'. ~In \'1) COMPANY DETAILS ~ BPAmoco REFERENCE INFORMATION C04dinate (NÆ) lœference: Well Céntre: Plan Curly G-16, True North Vertkal (IVD) Reference: 0..14 (343 + 29.5 GL) 63.80 Seçtion (VS) Reference; Slot· (O.OON,O.OOE) Meas~ra~~~e:= ~~~~~~GL) 63.80 Calculation Method: Minimum Curvature =r ~= ~~;Vc;~OOerNorth Error Surface: Elliptical + Casing Warnin~ Method: Rules Based o "r)' 100 1000 tJOO 000 Ir ~OOO 6000 .5>000 <000 /000 fS> '/OO/' cfj$ V ~~ 4000- c :2 o ~ '" ~ 4500- ] '€ .; 2 f-o l:mB-'¡¡t<n Start Di, 6/100' : 7003.14' MD, 4352.03'TVD l ! End Pi', : 7275.12' MD,.4359,94' TVD .'-", -~' ...:~~~~... ·"'10.._.-.......... ..... .,....--... ··,: JI~····-,··· "'-'-' ''''--. 5000- 3000 3500 4000 5000 Vertical Section at 83.00· [500ft/in] 6000 6500 SURVEY PROORAM Depth Pm Deptb To SurveyIPlan 5627.00 10070.49 Plamed: MPG-CurlyLl wp03 V8 Plan: MPG-CwiyLl wp03 (plan Curly G-16IPlan MPG-CurlyLl) Created By: K.en AJlen Date: 11/17/2003 Tool MWD+IFR+MS Checked: Date:_ Date:_ Reviewed: WEll. DETAll.S N""", +w.s +EI-W Northing - Latitude Longitude Slot Plan Curly 0.16 2693.84 782.28 6014426.00 557159.00 70"27'OO.178N 14'P3TOl.188W WA TARGET DETAILS Næno 1VD +W.s +EI-W Northing - Shope CurlyFlt#I 3408.80 1292.68 1758.14 6015732.00 558907.00 Polygon Curly FIt#2 3843.80 712.47 2166.74 6015155.00 559320.00 Polygon ~[;,'t, 4339.80 5.03 4298.58 6014464.00 561457.00 Polygon 4358.80 88.81 4460.04 6014549.00 561617.80 Pomt CurlyFlt#3 4373.80 275.06 3517.55 6014728.00 560674.00 Polygon CurlyLlT3 4393.80 -170.05 5740.42 6014300.00 562900.00 Pom< CurlyFlt#4 4418.80 341.54 4499.23 6014808.00 561655.00 Polygon CurlyL1 T4 4423.80 216.85 6543.95 6014753.00 563700.00 Point CurlyL1 T5 4423.80 822.12 6700.15 6015300.00 563852.00 Pom< SECTION DETAILS Sec MD Inc Azi TVD +N/·S +FJ·W DLeg TFace VSec Target 1 5627.00 70.80 84.25 4283.80 38.43 2863.24 0.00 0.00 2846.58 . 2 5773.05 88.06 87.36 4310.49 48.78 3005.89 12.00 10.38 2989.42 3 7003.14 88.06 87.36 4352.03 105.34 4233.96 0.00 0.00 4215.24 4 7230.45 88.54 101.00 4358.80 88.81 4460.04 6.00 88.21 4437.62 CurlyL 1 T2 5 7275.12 88.54 103.68 4359.94 79.26 4503.66 6.00 90.08 4479.75 6 8230.36 88.54 103.68 4384.31 -146.59 5431.50 0.00 0.00 5373.14 7 8541.70 88.00 85.00 4393.80 -170.05 5740.42 6.00 -91.92 5676.90 CurlyLl T3 8 8665.91 87.27 76.33 4398.94 -149.94 5862.76 7.00 -95.01 5800.79 9 8836.33 87.27 76.33 4407.07 -109.70 6028.17 0.00 0.00 5969.86 10 9499.06 90.00 30.00 4423.80 276.85 6543.95 7.00 -87.39 6528.90 CurlyLl T4 II 9826.63 90.00 10.35 4423.80 582.82 6656.36 6.00 -90.00 6677.77 12 10070.49 90.00 10.35 4423.80 822.72 6700. I 5 0.00 0.00 6750.47 CurlyLl T5 FORMATION TOP DETAILS No. TVDPath MDPath Fonnation 1 4323.80 6167.24 TSBC-Base OA 2 4345.80 6818.59 TSBB·Top OB 3 4373.80 7818.38 SBAS-Base OB CASING DETAILS No. TVD MD Name Size 1 4283.80 5627.00 75/8" 2 4423.80 10070.48 41/2" 7.625 4.500 COpy 0 e ..,:. T(' :II D~'plh 100"'0.49' \~:). ~1.2J ~. T\'O / . 9:.,0 ....--.... . ·····_·····)············:·i ~.;\~¡:.:-C"'I~II ~r!l·' \ "1:11I Curl)· (i-It. (P1:1Ii CUII~) 5500 , I ' 7000 , I ' 7500 I I I I spt!!Il"'f"'I\I-SU"1 Ø:J!I!1~J~11!4.W:.:]'J.I..,rllrt:Jr. BP Amoco tip REFERENCE INFORMA rlON Co-ordlnate (NÆ) Reference: Well Centre: Plan Curly 0-)6, True North Vertka1 (TVD) Reference: 0-14 (343 + 29.5 at) 63.80 Section (VS) Reference: Slo1- (O.OON,O.OOE) MeasuredDepthReferenœ: D-14(34J+29.SGL) 63.80 Calculation Method: Minimum Curvature SURVEY PROGRAM Depth Fm Depth To SurveylPlan 5627.00 10070.49 Planned: MPG.curlyLl wp03 V8 Tool MWD+IFR+MS Plan: MPG-CurlyLI wp03 (plan Curly G·J6IPlan MPG-CurlyLI) Created By: Ken Allen Date: 11/11/2003 COMPANY DETAILS Calculation Method: Minimum Curvature =~~~ ~S;~~nœrNorIh Error Surface: Elliptical + Casing Wami¡}j!; Method: Ru1esBased Checked: Date:_ Reviewed: Date WELL DETAILS o ¿r '/000 "»000 <'000 '<q, ;l!'" ..... +NI-S +fj·W Northing -OS 1.>1_ Longitude Slot PlanCurlyG-16 2693.84 78218 60 14426.00 551159.00 70"27'OO.178N 149"32'01.I88W NlA TARGET DETAILS ..... TVD +N/.s +F/-W - - Sbape CUrlyFlt#I 3408.8<> 1292.68 1758.14 6015732.00 SSS907.00 Polygon CurlyFlt#2 3843.80 112.47 2166.74 6015155.00 559320.00 Polygon ~"ì''h 4339.80 5.03 429858 6014464.00 561457.00 Polygon 4358.80 88.81 4460.04 6014549.00 561617.80 Point CurlyFlt#3 4373.80 275.06 3517.55 6014728.00 560674.00 Polygon CurlyLl T3 4393.80 -170.05 5740.42 6014300.00 562900.00 Point CurlyFlt#4 4418.80 347.54 4499.23 6014808.00 5616S5.00 Po¡}'gOO CUrtyLI T4 4423.8<> 276.85 6543.95 6014753.00 563700.00 Point CutlyLl TS 4423.8<> 822.72 6700.15 6015300.00 563852.00 Point SECTION DETAILS See MD Ine Azi TVD +N/-S +EJ-W DLeg TF ace VSee Target 1 5627.00 70.80 84.25 4283.80 38.43 2863.24 0.00 0.00 2846.58 e 2 5773.05 88.06 87.36 4310.49 48.78 3005.89 12.00 10.38 2989.42 3 7003.14 88.06 87.36 4352.03 105.34 4233.96 0.00 0.00 4215.24 4 7230.45 88.54 101.00 4358.80 88.81 4460.04 6.00 88.21 4437.62 CurlyLl T2 5 7275.12 88.54 103.68 4359.94 79.26 4503.66 6.00 90.08 4479.75 6 8230.36 88.54 103.68 4384.31 -146.59 5431.50 0.00 0.00 5373.14 7 8541.70 88.00 85.00 4393.80 -170.05 5740.42 6.00 -91.92 5676.90 CurlyLl T3 8 8665.91 87.27 76.33 4398.94 -149.94 5862.76 7.00 -95.01 5800.79 9 8836.33 87.27 76.33 4407.07 -109.70 6028.17 0.00 0.00 5969.86 10 9499.06 90.00 30.00 4423.80 276.85 6543.95 7.00 -87.39 6528.90 CurlyLl T4 II 9826.63 90.00 10.35 4423.80 582.82 6656.36 6.00 -90.00 6677.77 12 10070.49 90.00 10.35 4423.80 822.72 6700.15 0.00 0.00 6750.47 CurlyLl T5 FORMATION TOP DETAILS CASING DETAILS No. TVDPath MDPath Formation No. TVD MD Name Size 1 4283.80 5627.00 TSBD- Top OA 4283.80 5627.00 75/8" 7.625 2 4323.80 6167.24 TSBC-Base OA 4423.80 10070.48 41/2" 4.500 3 4345.80 6818.59 TSBB-Top OB 4 4373.80 7818.38 SBA5-Base OB 4112" G-CurlyLl wp03 CurlyLl T5 l (I I , ,/ I 1000- c ;§ o Ë :;:- :c 1:: ~ :c :; o '" e - ~ :--:: . ~ -500 6000 6500 , I ' 7000 I I I , I 7500 Wesl(-)/East(+) [500ft/in] Sp&l""1l""1y-sun DRU...LING seRVIc:es e J¡,1t.U.U8I;<IttÐN("0MP~ Sperry-Sun KW A Planning ----. ..---.---------. ---.--- ...-.---.-.. . ..-- -- ------- . -- -----------.. e bp ----.--. Company: Field: Site: Well: WelllJalh: BP Amoco Milne Point MPtGPad Plan Curly G-16 Plan MPG-CurlyL 1 -- .... . MPG-CurlyL 1 wp03 Dale: 1111712003 Tillie: 10:37:28 Page: Co-ordlnate(NE) I{derence: Well: Plan Curly G-16, True North Vertical (n'D) I{del'enc,e: D-14 ( 34.3 + 29.5 GL ) 63.8 Section (VS) Refel'ence: Well (0.00N,O.00E,83.00Azi) Survey Caleul:ttion Method: Minimum Curvature Db: Oracle .-. ... ..------.--.--.. Plan: Principal: Yes Field: Milne Point North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level stte: M pt G Pad TR-13-10 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 6011726.58 ft 556397.19 ft Well: Plan Curly G-16 Well Position: +N/-S 2693.84 ft Northing: 6014426.00 ft +E/-W 782.28 ft Easting: 557159.00 ft Position Uncertainty: 0.00 ft Wellpath: Plan MPG-CurlyL 1 Current Datum: Magnetic Data: Field Strength: Vertical Section: D-14 (34.3 + 29.5 GL) 111312003 57544 nT Depth From (TVD) ft 34.30 Height 63.80 ft +N/-S ft 0.00 Casing Points ',:\;.'';¡~D·.'''·· 5627.00 10070.48 Holi~.i~~.·' , . >Name ' : Diameter' in 7.625 4.500 T~,~:.",::: 4283.80 4423.80 9.875 6.125 7 5/8" 4 1/2" Formations ';7""i~t·}.:;,r.:'·'~riD 5627.00 4283.80 6167.24 4323.80 6818.59 4345.80 7818.38 4373.80 Formations .........................-....... TSBD-Top OA TSBC-Base OA TSBB- T op OB SBA5-Base OB ..------. ._.._._..__n . ...... .. .. ..--.--- . 11/1312003 8 From: Definitive Path Alaska, Zone 4 Well Centre bggm2003 33.685 N 24.162 W True 0.43 deg 70 27 0.178 N 149 32 1.188 W Plan Curly 5627.00 ft Mean Sea Level 25.12 deg 80.85 deg Direction deg 83.00 Dip Angle. deg., .... 0.00 0.00 0.00 0.00 Dip Directi<iii : ·::····deg 0.00 0.00 0.00 0.00 Date Composed: Version: Tied-to: Map Zone: Coordinate System: Geomagnetic Model: Latitude: 70 26 Longitude: 149 32 North Reference: Grid Convergence: Slot Name: Latitude: Longitude: Drilled From: Tic-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 ","'" . LIthology>. Targets Map Map <--' Latitude --> <- Longitude",-> ·.."!'Iame Description TVD +N/-S :. .; +EI-W Northing" . Easting Deg'Min Sec Deg Min Sec .. ..'Dip. Dir. fF·.·';;· ft .: :>·ft. ft ft ... Curly FIt#1 3408.80 1292.68 1758.14 6015732.00 558907.00 70 27 12.890 N 149 31 9.547 W -Polygon 1 3408.80 1292.68 1758.14 6015732.00 558907.00 70 27 12.890 N 149 31 9.547 W -Polygon 2 3408.80 -36.77 1142.86 6014398.00 558302.00 70 26 59.816 N 149 31 27.625 W Curly Flt#2 3843.80 712.47 2166.74 6015155.00 559320.00 70 27 7.182 N 149 30 57.550 W -Polygon 1 3843.80 712.47 2166.74 6015155.00 559320.00 70 27 7.182 N 149 30 57.550 W -Polygon 2 3843.80 -262.80 1925.23 6014178.00 559086.00 70 26 57.591 N 149 31 4.651 W Curly Poly 4339.80 5.03 4298.58 6014464.00 561457.00 70 27 0.216 N 149 29 54.949 W -Polygon 1 4339.80 5.03 4298.58 6014464.00 561457.00 70 27 0.216 N 149 29 54.949 W -Polygon 2 4339.80 -422.26 5894.50 6014049.00 563056.00 70 26 56.003 N 149 29 8.090 W -Polygon 3 4339.80 158.02 6650.05 6014635.00 563807.00 70 27 1.703 N 149 2845.887 W spe""""y-sun DRIL.L.ING seRVIces e Sperry-Sun KW A Planning e " 1W.UØf¡,11m1N «IMf'~ bp --------.----- ........-- n________ -.. -.----- .. ._-----. Company: .'Ield: Site: Well: I Wellpath: BP Amoco Milne Point MPtGPad Plan Curly G-16 Plan MPG-CurlyL 1 I>ate: 1111712003 Tillie: 10:37:28 I'a~e: 2 Co-ordinate(~E) Rdcrenee: Well: Plan Curly G-16, True North Vertical ('1'\'1» Rdcrencc: D-14 ( 34.3 + 29.5 GL ) 63.8 Scction (V8) Refcrence: Well (0.00N,O.00E,83.00Azi) SlIn'cy Calculation Mcthod: Minimum Curvature I>b: Oracle Targets r-~~~'~:~--'" ------ - -- -----. n_________ ....-..---- -- .---- . . ....",... ~Iap Map <---- Latitudc ---> <-- LOlIgiludc ---> I Uescriptioll TVI> +N/-S +E/-W :\orthin~ Easting I>cg ~lill Sec I>cg :\1i1l Scc i I>il', l>ir. ft ft ft ft ft ---- ----- . .----..--. .-....--.. ._-------. .-----. -Polygon 4 4339.80 816.71 6831.12 6015295.00 563983.00 70 27 8.180 N 149 28 40.552 W -Polygon 5 4339.80 880.63 6581.58 6015357.00 563733.00 70 27 8.811 N 149 28 47.879 W -Polygon 6 4339.80 278.82 6416.95 6014754.00 563573.00 70 27 2.893 N 149 2852.730 W -Polygon 7 4339.80 -17.40 5789.59 6014453.00 562948.00 70 26 59.985 N 149 2911.161 W -Polygon 8 4339.80 244.05 4300.41 6014703.00 561457.00 70 27 2.566 N 149 29 54.891 W -Polygon 9 4339.80 145.03 2736.46 6014592.00 559894.00 70 27 1.600 N 149 30 40.823 W -Polygon 10 4339.80 -122.03 2739.41 6014325.00 559899.00 70 26 58.973 N 149 30 40.739 W CurlyL 1 T2 4358.80 88.81 4460.04 6014549.00 561617.80 70 27 1.039 N 149 29 50.205 W Curly FIt#3 4373.80 275.06 3517.55 6014728.00 560674.00 70 27 2.875 N 149 30 17.882 W -Polygon 1 4373.80 275.06 3517.55 6014728.00 560674.00 70 27 2.875 N 149 30 17.882 W -Polygon 2 4373.80 -287.78 3487.23 6014165.00 560648.00 70 26 57.340 N 149 30 18.780 W CurlyL 1 T3 4393.80 -170.05 5740.42 6014300.00 562900.00 70 26 58.484 N 149 29 12.609 W Curly FIt#4 4418.80 347.54 4499.23 6014808.00 561655.00 70 27 3.583 N 149 29 49.050 W -Polygon 1 4418.80 347.54 4499.23 6014808.00 561655.00 70 27 3.583 N 149 29 49.050 W -Polygon 2 4418.80 -204.81 4536.00 6014256.00 561696.00 70 26 58.150 N 149 29 47.980 W CurlyL1 T 4 4423.80 276.85 6543.95 6014753.00 563700.00 70 27 2.873 N 149 28 49.000 W CurlyL 1 T5 4423.80 822.72 6700.15 6015300.00 563852.00 70 27 8.240 N 149 28 44.398 W Plan Section Information ,," M]) .. :.1~~¡::L;, Azim TVI> +N/~S .:".,", :tE/-W m,s:; . Build Tü¡.h TFO. Target ft . . deg ft . .'ft, ft degl1:,þOft deg/1 OOft~~g/1 OOft deg·::. 5627.00 70.80 84.25 4283.80 38.43 2863.24 0.00 0.00 0.00 0.00 5773.05 88.06 87.36 4310.49 48.78 3005.89 12.00 11.82 2.13 10.38 7003.14 88.06 87.36 4352.03 105.34 4233.96 0.00 0.00 0.00 0.00 7230.45 88.54 101.00 4358.80 88.81 4460.04 6.00 0.21 6.00 88.21 CurlyL 1 T2 7275.12 88.54 103.68 4359.94 79.26 4503.66 6.00 0.00 6.00 90.08 8230.36 88.54 103.68 4384.31 -146.59 5431.50 0.00 0.00 0.00 0.00 8541.70 88.00 85.00 4393.80 -170.05 5740.42 6.00 -0.17 -6.00 -91.92 CurlyL 1 T3 8665.91 87.27 76.33 4398.94 -149.94 5862.76 7.00 -0.59 -6.98 -95.01 8836.33 87.27 76.33 4407.07 -109.70 6028.17 0.00 0.00 0.00 0.00 9499.06 90.00 30.00 4423.80 276.85 6543.95 7.00 0.41 -6.99 -87.39 CurlyL 1 T4 9826.63 90.00 10.35 4423.80 582.82 6656.36 6.00 0.00 -6.00 -90.00 10070.49 90.00 10.35 4423.80 822.72 6700.15 0.00 0.00 0.00 0.00 CurlyL 1 T5 Survey MI> InCl"" Azlm TVD Sys TVI> MapN MapE VS I>LS TFO Tool ft··> ·.·.·,.:':·.deg deg ft ft ft .ft . ft deg/100ft .deg 5627.00 70.80 84.25 4283.80 4220.00 6014486.39 560021.59 2846.58 0.00 0.00 75/8" 5650.00 73.52 84.77 4290.85 4227.05 6014488.65 560043.36 2868.4 7 12.00 10.38 MWD+IFR+MS 5675.00 76.47 85.32 4297.32 4233.52 6014490.92 560067.40 2892.60 12.00 10.22 MWD+IFR+MS 5700.00 79.43 85.85 4302.53 4238.73 6014492.98 560091.75 2917.02 12.00 10.08 MWD+IFR+MS 5725.00 82.38 86.37 4306.49 4242.69 6014494.85 560116.36 2941.67 12.00 9.97 MWD+IFR+MS 5750.00 85.34 86.89 4309.16 4245.36 6014496.50 560141.16 2966.47 12.00 9.89 MWD+IFR+MS 5773.05 88.06 87.36 4310.49 4246.69 6014497.83 560164.13 2989.42 12.00 9.83 MWD+IFR+MS 5800.00 88.06 87.36 4311.40 4247.60 6014499.27 560191.02 3016.28 0.00 0.00 MWD+IFR+MS 5900.00 88.06 87.36 4314.77 4250.97 6014504.63 560290.81 3115.93 0.00 0.00 MWD+IFR+MS 6000.00 88.06 87.36 4318.15 4254.35 6014510.00 560390.60 3215.58 0.00 0.00 MWD+IFR+MS 6100.00 88.06 87.36 4321.53 4257.73 6014515.36 560490.39 3315.24 0.00 0.00 MWD+IFR+MS 6167.24 88.06 87.36 4323.80 4260.00 6014518.97 560557.49 3382.24 0.00 0.00 TSBC-Base OA 6200.00 88.06 87.36 4324.91 4261.11 6014520.72 560590.18 3414.89 0.00 0.00 MWD+IFR+MS 6300.00 88.06 87.36 4328.28 4264.48 6014526.09 560689.97 3514.54 0.00 0.00 MWD+IFR+MS 6400.00 88.06 87.36 4331.66 4267.86 6014531.45 560789.76 3614.20 0.00 0.00 MWD+IFR+MS spef"'lf"'ly-sun ORIL.L.ING SERVIC:ES " KWJ...,.TOt( COMf'~ BP Amoco Milne Point MPtGPad Plan Curly G-16 Plan MPG-CurlyL 1 CompallY: Held: Site: Well: Wellpatll: L__._.. Survey ]\1U ft --.-- ..-.------ ... 6500.00 6600.00 6700.00 6800.00 6818.59 6900.00 7003.14 7050.00 7100.00 7150.00 7200.00 7230.45 7250.00 7275.12 7300.00 7400.00 7500.00 7600.00 7700.00 7800.00 7818.38 7900.00 8000.00 8100.00 8200.00 8230.36 8250.00 8300.00 8350.00 8400.00 8450.00 8500.00 8541.70 8550.00 8600.00 8650.00 8665.91 8700.00 8800.00 8836.33 8850.00 8900.00 8950.00 9000.00 9050.00 9100.00 9150.00 9200.00 9250.00 9300.00 I lie! .\7.lm deg deg 88.06 88.06 88.06 88.06 88.06 88.06 88.06 88.15 88.26 88.36 88.47 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.54 88.50 88.40 88.31 88.22 88.14 88.06 88.00 87.95 87.65 87.36 87.27 87.27 87.27 87.27 87.31 87.48 87.65 87.84 88.03 88.23 88.44 88.65 88.87 89.09 87.36 87.36 87.36 87.36 87.36 87.36 87.36 90.18 93.17 96.17 99.17 101.00 102.17 103.68 103.68 103.68 103.68 103.68 103.68 103.68 103.68 103.68 103.68 103.68 103.68 103.68 102.50 99.50 96.50 93.50 90.50 87.50 85.00 84.42 80.93 77 .44 76.33 76.33 76.33 76.33 75.37 71.87 68.37 64.88 61.38 57.88 54.39 50.89 47.40 43.90 9350.00 ,89.32 40.41 9400.00 . 89.54 36.92 e Sperry-Sun KW A Planning -"......,...,,-- -- ......------... .,...--.--- ..'''-.-"....-,.--.----.- - ---. TVI) ft 4335.04 4338.42 4341.79 4345.17 4345.80 4348.55 4352.03 4353.58 4355.15 4356.62 4358.01 4358.80 4359.30 4359.94 4360.57 4363.13 4365.68 4368.23 4370.78 4373.33 4373.80 4375.88 4378.43 4380.99 4383.54 4384.31 4384.82 4386.17 4387.61 4389.12 4390.71 4392.37 4393.80 4394.09 4396.01 4398.19 4398.94 4400.57 4405.34 4407.07 4407.72 4409.99 4412.12 4414.08 4415.89 4417.52 4418.97 4420.24 4421.32 4422.21 4422.91 4423.41 e bp . .---- - -- .. ----- )ale: 11117/2003 Time: 10:37:28 Page: 3 Co-ordinateC'Œ) Reference: Well: Plan Curly G-16, True North Vertical (TV I» Refercnce: D-14 (34.3 + 29.5 GL) 63.8 Section (VS) Iteferellee: Well (0.00N,O.00E,83.00Azi) Survey Calcuhllioll :\1elhod: Minimum Curvature Ub: Oracle .---.... S)'sTVI) Mllp:'<i ft ft 4271.24 4274.62 4277.99 4281.37 4282.00 4284.75 4288.23 4289.78 4291.35 4292.82 4294.21 4295.00 4295.50 4296.14 4296.77 4299.33 4301.88 4304.43 4306.98 4309.53 4310.00 4312.08 4314.63 4317.19 4319.74 4320.51 4321.02 4322.37 4323.81 4325.32 4326.91 4328.57 4330.00 4330.29 4332.21 4334.39 4335.14 4336.77 4341.54 4343.27 4343.92 4346.19 4348.32 4350.28 4352.09 4353.72 4355.17 4356.44 4357.52 4358.41 . .-----.-.. .. -----.. 6014536.81 6014542.18 6014547.54 6014552.90 6014553.90 6014558.26 6014563.80 6014565.16 6014564.08 6014560.39 6014554.10 6014549.00 6014545.22 6014539.79 6014534.10 6014511.20 6014488.31 6014465.41 6014442.51 6014419.62 6014415.41 6014396.72 6014373.83 6014350.93 6014328.03 6014321.08 6014316.78 6014307.62 6014301.04 6014297.07 6014295.70 6014296.96 6014300.00 6014300.83 6014307.58 6014317.32 6014321.05 6014329.35 6014353.70 6014362.54 6014365.98 6014380.43 6014397.77 6014417.94 6014440.86 6014466.45 6014494.61 6014525.24 6014558.22 6014593.43 4359.11 6014630.74 4359.61 6014670.00 :\lapE ft 560889.55 560989.34 561089.13 561188.92 561207.47 561288.71 561391.62 561438.43 561488.39 561538.22 561587.79 561617.80 561636.97 561661.49 561685.69 561782.99 561880.29 561977.59 562074.89 562172.19 562190.08 562269.49 562366.79 562464.09 562561.39 562590.94 562610.09 562659.21 562708.75 562758.55 562808.50 562858.45 562900.00 562908.26 562957.75 563006.73 563022.18 563055.20 563152.06 563187.25 563200.46 563248.26 563295.10 563340.79 563385.18 563428.09 563469.36 563508.85 563546.40 563581.87 -".-...------------. . vs ft ----... 3713.85 3813.50 3913.15 4012.81 4031.34 4112.46 4215.24 4261.84 4311.23 4360.17 4408.52 4437.62 4456.14 4479.75 4503.01 4596.54 4690.06 4783.59 4877.12 4970.64 4987.83 5064.17 5157.69 5251.22 5344.74 5373.14 5391.58 5439.10 5487.37 5536.25 5585.61 5635.30 5676.90 5685.20 5735.15 5784.98 5800.79 5834.61 5933.82 5969.86 5983.41 6032.68 6081.37 6129.30 6176.28 6222.15 6266.73 6309.85 6351.36 6391.09 563615.13 6428.91 563646.06 6464.67 DI.S T"'O deg1100f! deg .---.------. -.. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 88.21 6.00 88.12 6.00 88.03 6.00 87.94 6.00 87.86 6.00 90.08 6.00 90.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 268.08 6.00 268.11 6.00 268.19 6.00 268.28 6.00 268.37 6.00 268.46 6.00 268.56 7.00 264.99 7.00 265.01 7.00 265.14 7.00 265.29 0.00 0.00 0.00 0.00 0.00 0.00 7.00 272.61 7.00 272.65 7.00 272.81 7.00 272.96 7.00 273.10 7.00 273.22 7.00 273.34 7.00 273.44 7.00 273.53 7.00 273.60 --- -._-- - -- Tool MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS TSBB-Top OB MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS CurlyL 1 T2 MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS SBA5-Base OB MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS CurlyL 1 T3 MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS 7.00 273.67 MWD+IFR+MS 7.00 273.72 MWD+IFR+MS spE!.........y-sun DRIL-L-ING SERVICES e Sperry-Sun KW A Planning e A IWLIMIII'I'ON C,ONP~ bp BP Amoco' .,' ' '":,.....,,;'.,,.',.. .".... ~i;!~i&~i:: .. Date;:·,::i:::i,iiiih1/2003" l'ime: 10:37:28 .' ::.P~I:ë:>... 4 ··'ë~~~~a¡§Ë~:.~¡~iªJj}~{:o- Survey :',,:"':'i\1:Q::, " ::";'IoCl: "f;,;,AZhù:·'".· Tii~L\,: Sys TVD '...VS DLS,', n:o'" '. ...Tool ",:,"ff; . '::;TCieg :·,·';;;·"::';d~9··::;'·.. ·ft .,. ·ft . degi1 000 ' deg ':"n 9450.00 89.77 33.43 4423.70 4359.90 6014711.08 563674.54 6498.23 7.00 273.75 MWD+IFR+MS 9499.06 90.00 30.00 4423.80 4360.00 6014753.00 563700.00 6528.90 7.00 273.77 CurlyL 1 T 4 9550.00 90.00 26.94 4423.80 4360.00 6014797.96 563723.94 6558.46 6.00 270.00 MWD+IFR+MS 9600.00 90.00 23.94 4423.80 4360.00 6014843.26 563745.07 6585.28 6.00 270.00 MWD+IFR+MS 9650.00 90.00 20.94 4423.80 4360.00 6014889.61 563763.80 6609.86 6.00 270.00 MWD+IFR+MS 9700.00 90.00 17.94 4423.80 4360.00 6014936.87 563780.07 6632.12 6.00 270.00 MWD+IFR+MS 9750.00 90.00 14.94 4423.80 4360.00 6014984.93 563793.86 6652.01 6.00 270.00 MWD+IFR+MS 9800.00 90.00 11.94 4423.80 4360.00 6015033.63 563805.11 6669.48 6.00 270.00 MWD+IFR+MS 9826.63 90.00 10.35 4423.80 4360.00 6015059.79 563810.05 6677.77 6.00 270.00 MWD+IFR+MS 9900.00 90.00 10.35 4423.80 4360.00 6015132.07 563822.67 6699.64 0.00 0.00 MWD+IFR+MS 10000.00 90.00 10.35 4423.80 4360.00 6015230.57 563839.87 6729.46 0.00 0.00 MWD+IFR+MS 10070.48 90.00 10.35 4423.80 4360.00 6015299.99 563852.00 6750.47 0.00 0.00 41/2" 10070.49 90.00 10.35 4423.80 4360.00 6015300.00 563852.00 6750.47 0.00 0.00 CurlyL 1 T5 (e) If a well has multiple well branches, each branch requires a separate Permit to Drill. If multiple well branches are proposed from a single conductor, surface, or production casing, the applicant shall designate one branch as the primary well bore and include all information required under (c) of this section with the application for a Permit to Drill for that branch. For each subsequent well branch, the application for a Permit to Drill need only inc1ude information under (c) of this section that is unique to that branch and need not include the $100 fee. 20 MC 25.005 PERMIT TO DRILL e e e e TRANSMIT AL LETTER CHECKLIST CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ;11¡?¿( 4--/0 L f 2tJ3 - Z/ / CHECK WHAT APPLIES j Rev: 07/10/02 C\jody\templates PTD# ADD-ONS (OPTIONS) MULTI LATERAL (If API Dum ber last two (2) digits are between 60-69) "CLUE" Tbe permit is for.~ }le~ wellbore segment of existing well m P't,£ é:9 - / ~ , Permit No,Pf¡">'-2/DAPI No. S¿,;I ·DZ,1: 2 51ß1·-c>ô Production should continue to be reported as a function' of tbe original API number stated above. BOLE In accordance with 20 AAC 25.005(1), all records, data and logs acquired for tbe pilot bole must be clearly differentiated in botb name (name on permit plus PH) and API Dumber (50 70/80) from records, data and logs acquired for well (name on permit). Pll..OT (PH) SPACING EXCEPTION DRY DITCH SAMPLE The permit is approved subject to fuD compliance witb 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes tbe liability of any protest to the spacing . exception tbat may occur. All dry ditch sample sets submitted to tbe Commission must be in no greatertban 30' sample intervals from below tbe permafrost or from where samples are first caught and 10' sample intervals through target zones. ~ D Well bore seg Annular Disposal On Program DEV On/Off Shore 11328 Unit Name: MILNE PT UNIT SB G-16L1 GeoArea 890 Laieral:_ fee w~íYed_ CQrrected: _ Surface Wel PEND DEVI tQP_ prQd_ iotelY¡¡l_and TD inAQL_02551B in ADL 025906; CQnservatioo Ord~r f\JQ. ,,-n:Schrader_BJu_ff_QiI pool CQnservatioo Ord~r f\JQ. ,,-n: _ NomioaJ 1Q-acre driJling units;_ nOJ1)ioil)1um well $ep~ratiQn_ di~tance. f\JearbyMpU G-_6producer is_being aba_ndQn~d._SFP_ e NA No Y~s Yes .Yes Yes Yes Y~s Yes Yes Yes Y~s Yes NA NA NA NA Initial ClasslType 525140 MILNE POINT, SCHRADER BLFF OIL NC BP EXPLORATION (ALASKA) P~rmitfee attached _Lease _number Field & Pool Company 11 ~ppropriat~ _U_ni~ue weltn_ar:ne _aod ou_mb~r bQundary _ Jocated iRa_d_efined pool Jocated proper dLstance_ from drilling unit from Qther wells Jo_cated proper dLstance_ _Sufficient ~ Jf _deviatec LndrilJing unit included "creage _ayailable is_wellboJe pl¡¡t WeJ WeJ WeJI 2 3 4 5 6 7 ,8 9 PTD#: 203211 0 Administration JQrce_ cao be Lssu_ed witho_ut conservaiion Qrder c~o be issued without admini$tr.ati...e_approvaJ ,Oper.ator onl~ aff~cted party ,Oper~tor bas_approprLate_bQnd iIl Permit Permit 10 11 in_cor:nr:neotsHfQr Qnly) _seIYiçe well 10# 15-day wait WeJ All wellsJ/\,it\1i!l.1Kmil~.are.a.of r.eyiew ideotified (For.s.ervjce welJ onl~) Pre.-produçed. iojector; duratjo.n .of pre-production less. t\1an. 3 months. (for ACMP _ Fin.ding Qf CQnsist~ocy .has been issued. for. tbis proiect. t¡ (put be approved before Jocated wiihin area an.d.str¡¡ta aut\1Qrized byJojection Order Can permit 12 13 14 15 16 17 Date Appr SFD 121912003 siie. Conductor in.stalled_ io MPG-16 AI/aquifers ex~r:npedAOCFR t47J Surf~~ casing Lnstalled in MI?G-.16 inst¡¡lled in_MPG-16 be drilled from exisiiog driJ Well wi 02(b )(3) I?rodu.ction casing Slotted lioer J;ompletiQo p1aon.ed w~IJ($) I planoe.d, Ali wa~te to.Class No rese.rv.e.pjt Big jsequippe.dwitb steelpit~. No J;lose apProach. iss.ues iden.tified. with Jhi~ lateral J?ro~imii~ analysis performe.d e ppg Expected. BHP 7.7 EMW.Planned mud weigh_t 9..1 3500 psi .appropriate, 15"'5 p~i CalcuJaie.d.MASP NA NA NA NA No Yes Yes NA Y~s NA Yes Yes Yes Yes Yes No. NA Cooduçtor $tringprovided Sul"face .ca~ing_pJotects al 8 19 20 Engineering known_ USQW$ CMT.vol.adeQu.ateJo circulate.onconductor.& su_rfcsg tie-in Jong .string tosul"f CS-9. .CMT vol. a.deQuate to known productiye bOJ~Qns C, T, B .&.permafrost Adequat~Jankage.or reserve pit _ Jf a re-drilt bas a_ 10c4.03 fOJ aba_ndonment beeo approved Adequat~ wellb.ore. s.eparatiOIl proposed t meet reg uJa.tions Jist Jf.djverler required, does _adequate .BOPEs,.dO _BOPE press raiiog appropriate; test to .(pui p$ig in .comments) C!1okemanifQld compJies. wlAPt RP-53. (May 84) WOJk will occur without .operation sbutdoWIl 21 ,22 23 24 25 '26 27 Date 28 12/5/2003 29 30 31 32 ,33 34 CMT. will coyer .at _C.asiog desigO$ ad_eQuaie for. _DrilJiog fluid.PJogram sc_hematic_&equip ihey meetreguJation Appr TEM Big is.e.quippe_dwitb sensors ~od alarms. .Is_ presence. of H2S gas. probable MechaIlicaLcoodjtLon of weJls wiihin AQß yerified_ (for.s~(Vice wel] onJy) Yes Yes NA NA NA Permitc~o be issu.ed wlo_hydrogen_s_ulfide measur.es 35 36 Date 37 12/9/2003 38 39 Geology Appr SFD ppg mud_. Expected œsel"'{ojr pressure is 7..7.ppg EMW; wlllbe drilled with 9.1 _D~tapresented on pote.ntial overpres.sure zones Seismic.analysjs_ oJ ShaJlow gaszooes (if Off-~hor.e) Seabed CQodition survey Co.ntaçt ?ifY Date r~fz n_am_e/p\1oneJorweekly progress reports [e1<ploratory Qnly] Public Commissioner Date Engineering Commissioner: Date: <JfW Geologic Commissioner: DfS e e Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ,.. Sperry-Sun D~ing Services LIS Scan Utility . § ð3~Ð-ll $Revision: 3 $ LisLib $Revision: 4 $ Mon Mar 01 15:35:42 2004 l:l~' Reel Header Service name............ .LISTPE Date.................... .04/03/01 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date.................... .04/03/01 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPG-16 L1 500292318960 BP Exploration (Alaska) Inc. Sperry-Sun Drilling Services 01-MAR-04 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0002878275 T. MCGUIRE E. VAUGHN MWD RUN 2 MW0002878275 T. MCGUIRE E. VAUGHN MAD RUN 2 MW0002878275 T. MCGUIRE E. VAUGHN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 MW0002878275 J. STRAHAN C. DIXON MWD RUN 7 MW0002878275 J. STRAHAN C. DIXON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 27 13N 10E 1990 3443 RECEIVED 62.90 29.20 .'. ,'~, ~,"": .I í) .". ,'\ ,,\1 f'" '~: ï () ~~uu;,~_~ # WELL CASING RECORD ¡l. Gas Con$, Comn1iœiön OPEN HOLE CASING DRILLERS RBDMS RD MAR 3 0 2Dß% 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING BIT ... 13.5'P' 9.875 6.125 (IN) SIZE (IN) 20.000 10.750 7.625 DEPTH (FT) 112.0 2526.0 6260.0 . # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS LATERAL WAS DRILLED OFF OF A WHIPSTOCK, THE TOP OF WHICH WAS AT 5648'MD/4288'TVD AND THE BOTTOM WAS AT 5660'MD/4291'TVD. THIS OPERATION WAS ACCOMPLISHED DURING MWD RUN 6. ONLY SROP DATA ARE PRESENTED FOR RUN 6. 4. MWD RUN 1 COMPRISED DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 5. MWD RUNS 2 & 7 COMPRISED DIRECTIONAL WITH DGR AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). RUN 7 ADDITIONALLY INCLUDED AT-BIT INCLINATION (ABI). 6. A MAD PASS WAS PERFORMED AFTER REACHING TD OF RUN 2. THE INTERVALS PRESENTED ARE 4970'MD/3969'TVD TO 4670'MD/3812'TVD AND 4370'MD/3665'TVD TO 4170'MD/3569'TVD. THESE INTERVALS DO. NOT COINCIDE WITH THOSE OF THE DRILLERS (5044'MD - 4175'MD, BIT DEPTHS) DUE TO DATA EDITING NECESSITATED BY EXCESSIVE SRATS OVER PARTS OF THE OVERALL MAD INTERVAL. 7. DEPTB SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM K. COONEY (SIS/BP), DATED 2/24/04, QUOTING AUTHORIZATION FROM MIKIE SMITH (BP GEOLOGIST). MWD DATA ARE CONSIDERED PDC. 8. MWD RUNS I, 2, 6, & 7 REPRESENT WELL MPG-16 Ll WITH API#: 50-029- 23189-60. THIS WELL REACHED A TOTAL DEPTH (TD) OF 10030'MD/4401'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SRAT SMOOTHED TOOL SPEED WHEN NOT DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). SLIDE = NON-ROTATED INTERVALS. RESISTIVITY ( EXTRA RESISTIVITY ( SHALLOW RESISTIVITY (MEDIUM RESISTIVITY (DEEP AN 'M' SUFFIX ON CURVE MNEMONICS DENOTES MAD PASS DATA. $ . . File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number........ ...1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP RPM RPS FET RPD RPX $ 1 and clipped curves; all bit runs merged. .5000 START DEPTH 62.0 114.5 2510.0 2510.0 2510.0 2510.0 2510.0 STOP DEPTH 9976.0 10030.0 9983.0 9983.0 9983.0 9983.0 9983.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH ------ BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ # REMARKS: BIT RUN NO 1 2 6 7 MERGED MAIN PASS. $ MERGE TOP 62.0 2534.0 5648.5 5673.0 MERGE BASE 2534.0 5648.0 5673.0 10030.0 # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 · erst Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 62 10030 5046 19937 62 10030 ROP MWD FT/H 1. 28 31693.5 315.373 19832 114.5 10030 GR MWD API 14.15 135.49 71.6593 19829 62 9976 RPX MWD OHMM 0.21 1750.55 13.7004 14947 2510 9983 RPS MWD OHMM 0.58 2000 18.2923 14947 2510 9983 RPM MWD OHMM 0.86 2000 22.1534 14947 2510 9983 RPD MWD OHMM 1. 58 2000 23.9981 14947 2510 9983 FET MWD HOUR 0.05 144.33 0.622431 14947 2510 9983 First Reading For Entire File......... .62 Last Reading For Entire File.......... .10030 File Trailer Service name............ .STSLIB.OOl Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type.......... . . . . . .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type............... .LO --previous File Name...... .STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MAD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR RPM RPD RPS RPX FET RAT $ 2 and clipped curves¡ all MAD runs merged using earliest passes. .5000 START DEPTH 4162.5 4171. 5 4171.5 4171.5 4171.5 4171.5 4216.0 STOP DEPTH 4990.5 5002.0 5002.0 5002.0 5002.0 5002.0 5042.0 # MERGED DATA SOURCE PBU TOOL CODE MWD $ MAD RUN NO. MAD PASS NO. MERGE TOP 2 1 4171.0 MERGE BASE 5042.0 # REMARKS: MERGED MAD PASS. $ # Data Format Specification Record Data Record Type................ ..0 Data Specification Block Type.....O Logging Direction...... 411Þ...... . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RAT MAD FT/H 4 1 68 4 2 GR MAD API 4 1 68 8 3 RPX MAD OHMM 4 1 68 12 4 RPS MAD OHMM 4 1 68 16 5 RPM MAD OHMM 4 1 68 20 6 RPD MAD OHMM 4 1 68 24 7 FET MAD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4162.5 5042 4602.25 1760 4162.5 5042 RAT MAD FT/H 0.5 477.28 345.531 1152 4216 5042 GR MAD API 23.91 109.49 54.5236 1159 4162.5 4990.5 RPX MAD OHMM 3.08 55.43 17.5679 1185 4171.5 5002 RPS MAD OHMM 3.09 94.43 22.7207 1185 4171.5 5002 RPM MAD OHMM 3.27 170.41 28.0416 1185 4171.5 5002 RPD MAD OHMM 3.95 251. 94 34.8927 1185 4171.5 5002 FET MAD HOUR 20.71 28.18 24.5608 1185 4171.5 5002 First Reading For Entire File......... .4162.5 Last Reading For Entire File.......... .5042 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type................LO Next File Name......... ..STSLIB.003 Physical EOF File Header Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY 3 header data for each bit run in separate files. 1 .5000 VENDOR TOOL CODE GR ROP $ START .TH 62.0 114.5 STOP DEPTH 2488.0 2534.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN); # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value..................... .-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order DEPT ROP MWD010 GR MWD010 Units FT FT/H API Size 4 4 4 Nsam Rep 1 68 1 68 1 68 Code . 22-JAN-04 Insite 66.37 Memory 2534.0 112.0 2534.0 .0 16.2 TOOL NUMBER 61497 13 .500 .0 SPUD MUD 9.40 110.0 7.5 200 6.4 .000 .000 .000 .000 .0 68.0 .0 .0 Offset o 4 8 Channel 1 2 3 . . First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 62 2534 1298 4945 62 2534 ROP MWD010 FT/H 12.42 31693.5 424.231 4840 114.5 2534 GR MWD010 API 17.02 116.62 62.994 4853 62 2488 First Reading For Entire File......... .62 Last Reading For Entire File.......... .2534 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type.. ............. .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPX RPS RPS RPD FET ROP $ 4 header data for each bit run in separate files. 2 .5000 START DEPTH 2488.5 2510.0 2510.0 2510.0 2510.0 2510.0 2534.5 STOP DEPTH 5648.0 5648.0 5648.0 5648.0 5648.0 5648.0 5648.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 24-JAN-04 Insite 66.37 Memory 5648.0 2534.0 5648.0 21.6 72.1 # BOTTI TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type............. .....0 Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type. ..0 . TOOL NUMBER 124724 136749 9.875 2526.0 LSND 9.20 55.0 9.0 350 6.0 4.000 2.330 5.000 2.400 65.0 116.6 65.0 65.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OHMM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2488.5 5648 4068.25 6320 2488.5 5648 ROP MWD020 FT/H 1. 28 2394.89 327.942 6228 2534.5 5648 GR MWD020 API 14.15 119.71 67.4795 6320 2488.5 5648 RPX MWD020 OHMM 0.93 250.06 10.7506 6277 2510 5648 RPS MWD020 OHMM 1. 03 762.75 11.8232 6277 2510 5648 RPM MWD020 OHMM 0.86 2000 14.0658 6277 2510 5648 RPD MWD020 OHMM 1. 58 2000 20.4532 6277 2510 5648 FET MWD020 HOUR 0.. 36.94 0.646554 6277 tIÞ 2510 5648 First Reading For Entire File......... .2488.5 Last Reading For Entire File. ........ ..5648 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE ROP $ 5 header data for each bit run in separate files. 6 .5000 START DEPTH 5648.5 STOP DEPTH 5673.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 30-JAN-04 Insite 66.37 Memory 5673.0 5648.0 5673.0 72.1 72.1 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE $ TOOL NUMBER # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.750 5648.0 # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): FLO-PRO 9.20 65.0 MUD PH: . MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 9.0 . 24000 5.8 .000 .0 .000 75.1 .000 .0 .000 .0 Name Service Order DEPT ROP MWD060 Units Size Nsam Rep Code Offset Channel FT 4 1 68 0 1 FT/H 4 1 68 4 2 Name Service Unit DEPT FT ROP MWD060 FT/H Min 5648.5 1.45 Max 5673 17.34 First Reading For Entire File......... .5648.5 Last Reading For Entire File......... ..5673 File Trailer Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation..... ..04/03/01 Maximum Physical Record. .65535 File Type... ............ .LO Next File Name.......... .STSLIB.006 Physical EOF File Header Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type.............. ..LO Mean 5660.75 9.5222 Nsam 50 50 First Reading 5648.5 5648.5 Last Reading 5673 5673 Previous File Name..... .4IÞSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS GR RPX ROP $ 6 . header data for each bit run in separate files. 7 .5000 START DEPTH 5648.5 5648.5 5648.5 5648.5 5648.5 5648.5 5673.5 STOP DEPTH 9983.0 9983.0 9983.0 9983.0 9976.0 9983.0 10030.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ 01-FEB-04 Insite 66.37 Memory 10030.0 5673.0 10030.0 80.3 95.0 TOOL NUMBER 129046 162742 6.125 5648.0 FLO-PRO 9.10 47.0 9.0 25000 4.8 .180 .130 .230 1.050 63.0 92.0 64.0 57.0 # 'f' , . d Data Format Specl lcatlon Recor Data Record Type..................O Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD070 FT/H 4 1 68 4 2 GR MWD070 API 4 1 68 8 3 RPX MWD070 OHMM 4 1 68 12 4 RPS MWD070 OHMM 4 1 68 16 5 RPM MWD070 OHMM 4 1 68 20 6 RPD MWD070 OHMM 4 1 68 24 7 FET MWD070 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5648.5 10030 7839.25 8764 5648.5 10030 ROP MWD070 FT/H 18.67 707.75 247.682 8714 5673 .5 10030 GR MWD070 API 37.38 135.49 79.5694 8656 5648.5 9976 RPX MWD070 OHMM 0.21 1750.55 15.836 8670 5648.5 9983 RPS MWD070 OHMM 0.58 2000 22.9758 8670 5648.5 9983 RPM MWD070 OHMM 4.62 2000 28.0088 8670 5648.5 9983 RPD MWD070 OHMM 5.09 2000 26.5646 8670 5648.5 9983 FET MWD070 HOUR 0.14 144.33 0.604965 8670 5648.5 9983 First Reading For Entire File......... .5648.5 Last Reading For Entire File.......... .10030 File Trailer Service name............ .STSLIB.006 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.007 Physical EOF File Header Service name............ .STSLIB.007 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: MAD RUN NUMBER: MAD PASS NUMBER: # FILE SUMMARY VENDOR TOOL CODE GR FET RPD RPM RPS RPX RAT $ .500e 2 1 START DEPTH 4162.5 4171. 5 4171. 5 4171.5 4171.5 4171.5 4216.0 STOP DEPTH 4990.5 5002.0 5002.0 5002.0 5002.0 5002.0 5042.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ # BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RES IS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet . 24 -JAN-04 Insite 66.37 Memory 5042.0 4171.0 5042.0 21. 6 72 .1 TOOL NUMBER 124724 136749 9.875 2526.0 LSND 9.20 55.0 9.0 350 6.0 4.000 2.330 5.000 2.400 65.0 116.6 65.0 65.0 Data Reference Point... ........ .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RAT MAD021 FT/H 4 1 68 4 2 RPX MAD021 OHMM 4 1 68 8 3 RPS MAD021 OHMM 4 1 68 12 4 RPM MAD021 OHMM 4 1 68 16 5 RPD MAD021 OHMM 4 1 68 20 6 FET MAD021 HOUR 4 1 68 24 7 GR MAD021 API 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4162.5 5042 4602.25 1760 4162.5 5042 RAT MAD021 FT/H 0.5 477.28 345.531 1152 4216 5042 RPX MAD021 OHMM 3.08 55.43 17.5679 1185 4171.5 5002 RPS MAD021 OHMM 3.09 94.43 22.7207 1185 4171.5 5002 RPM MAD021 OHMM 3.27 170.41 28.0416 1185 4171.5 5002 RPD MAD021 OHMM 3.95 251.94 34.8927 1185 4171.5 5002 FET MAD021 HOUR 20.71 28.18 24.5608 1185 4171.5 5002 GR MAD021 API 23.91 109.49 54.5236 1159 4162.5 4990.5 First Reading For Entire File......... .4162.5 Last Reading For Entire File.......... .5042 File Trailer Service name............ .STSLIB.007 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .04/03/01 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.008 Physical EOF Tape Trailer Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .04/03/01 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name........ . . . . .LISTPE Date.................... .04/03/01 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.......... . UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File . .