Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-204
e e
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
dÖ3 - ~O 1+ Well History File Identifier
Production Scanning
Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet)
Page Count Matches Number in Scanning Preparation: K YES
~ Date If/Lf/O''
Stage 1 If NO in stage 1, page(s) discrepancies were found:
Organizing (done)
D Two-sided /I 11111111'" 111111
RES CAN
~olor Items:
D Greyscale Items:
DIGITAL DATA
D Diskettes, No.
D Other, No/Type:
D Poor Quality Originals:
D Other:
NOTES:
BY: ~
Date 4/ t¡-!tJ 0
Dale '-1-/ '-t /óf&,
I I
-L x 30 =
Project Proofing
BY: ~
Scanning Preparation
BY:
Date:
BY:
BY:
Maria
Date:
Scanning is complete at this point unless rescanning is required.
D Rescan Needed 111111111I111111111
OVERSIZED (Scannable)
D Maps:
D Other Items Scannable by
a Large Scanner
OVERSIZED (Non-Scannable)
D Logs of various kinds:
D Other::
151
IMP
11111111111111 1/11I
151
rrJ1p
+ -1L- = TOTAL PAGES If/
(Count does not include cover sheet)
151
p
1111111111111111111
YES
NO
151 mp
NO
151
1111111111/1/11111I
ReScanned
BY:
Maria
Date:
151
Comments about this file:
11111111111111 "'II
Quality Checked
11/11111111I 111111I
10/6/2005 Well History File Cover Page.doc
• •
_ .9,,.
. `~°~ ~ -
MICROFILMED
03/01/2008
DO NOT PLACE
*...
>~' ~ '~
r-
-e,;
ANY NEW MATERIAL
UNDER THIS PAGE
F:~LaserFiche\CvrPgs_InsertslMicrofilm Marker.doc
2P-443 Permit to Drill
.
.
Subject: 2P-443 Permit to Drill
From: "Hayden, Philip" <Philip.Hayden~l~conocophillips.com>
D~lte: Thu, 15 Jan 2004 12:5] :57 -0900
To: steve _ davics@]admin.statc.ak.us
CC: "Jackson, Darron B." <darron.b.jackson«~'con()cophillips.com>, "Allsup-Drake, Sharon
K" <Sharon. K.Allsup-DrakeCq!conocophillips.com>
Steve,
with reference to your telephone message of this morning ConocoPhillips
would like to withdraw its permit to drill for 2P-443 as this well is
being replaced by well 2P-419, whose application you are currently
considering.
If there are any questions please let me know.
Regards
Philip
{). ..}~
r JZf"}.c"}~
d,) ~ ()JL(
('_(ì./n eLf!
~ "L 8{:ù<:R ~t~:J
~(ll
1 of 1
1/15/2004 3 :40 PM
.
~ IK\
~Lrù
AI,ASIiA ORAND GAS
CONSERVATION COMMISSION
Randy Thomas
Kuparuk Drilling Team Leader
ConocoPhillips (Alaska), Inc.
PO Box 100360
Anchorage, AK 99510-0360
.
FRANK H. MURKOWSKI, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re: Kuparuk River Field 2P-443
ConocoPhillips (Alaska), Inc.
Permit No: 203-204
Surface Location: 998' FNL, 1680' FWL, Sec. 17, T8N, R7E, UM
Bottomhole Location: 1950' FSL, 7" FEL, Sec. 19, T8N, R7E, UM
Dear Mr. Thomas:
Enclosed is the approved application for permit to drill the above referenced service well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely '2L'
BY ORDER OF THE COMMISSION
DATED thisJnday of December, 2003
ee: Department ofFish & Game, Habitat Section w/o enel.
Department of Environmental Conservation w/o enel.
e
e
kt d ""
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
1a. Type of Work: Drill~ RedrillU 1 b. Current Well Class: ExploratoryU Development Oil U Multiple Zone 0
Re-entry 0 Stratigraphic Test 0 Service 0 Development Gas 0 Single Zone 0
2. Operator Name: 5. Bond: l{ Blanket U Single Well 11. Well Name and Number:
ConocoPhillips Alaska, Inc. Bond No. 59-52-180 2P-443
3. Address: 6. Proposed Depth: 12. Field/Pool(s):
P.O. Box 100360 Anchorage, AK 99510-0360 MD: 10138' TVD: 5630' Kuparuk River Field
4a. Location of Well (Governmental Section): 7. Property Designation:
Surface: 998' FNL, 1680' FWL, Sec. 17, T8N, R7E, UM ADL 373112/389058 Meltwater Oil Pool
Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date:
2581' FSL, 133' FWL, Sec. 20, T8N, R7E, UM L32092 I 32409 1/23/2004
Total Depth: 9. Acres in Property: 14. Distance to
1950' FSL, 7' FEL, Sec. 19, T8N, R7E, UM 5760 Nearest Property: 2699' @ Target
4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest
Surface: x- 443640 ' y- 5868881 -' Zone- 4 252' AMSL feet Well within Pool: 2P-441 ,40.63
16. Deviated wells: 17. Anticipated Pressure (see 20 AAC 25.035)
Kickoff depth: 300 . ft. Maximum Hole Angle: 62.79° Max. Downhole Pressure: 2106 psig I Max. Surface Pressure: 1497 psig
18. Casing Program Setting Depth Quantity of Cement
Size Soecifications Top Bottom c. f. or sacks
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data)
42" 16" 62.5# H-40 Weld 80 28' 28' 108' 108' 410 sx Artie Set I (preinstalJed)
12.25" 9.625" 40# L-80 BTC 2863 28' 28' 2891 2316 546 sx ASLite & 294 sx LiteCRETE
8.5" 7" 26# L-80 BTCM 8887 28' 28' 8915 5071 352 sx LiteCRETE
8.5" 4.5" 12.6# L-80 IBTM 1223 8915 5071 10138 5630 (Included above)
19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations)
Total Depth MD (It): Total Depth TVD (It): Plugs (measured) Effective Depth MD (It): Effective Depth TVD (It): Junk (measured)
Casing Length Size Cement Volume MD TVD
Structural h ......
Conductor , \C'f :~III..·--...
Detailed Operations -, VClJ
Intermediate /j){;. C r.
Production V J /(I/J-?
Liner ,f' '. ,..
Perforation Depth MD (ft): Perforation Depth TVD (ft): Ai7i#1;;Comm¡_Jfi
20. Attachments: Filing Fee 0 BOP Sketch!:) Drilling Program~ Time v. Depth Plot 0 Shallow Hazard Analysis Q
Property Plat 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 requirements 0
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Philip Hayden 265-6481
Printed Name R. Thomas Title Kuparuk Drilling Team Leader
Signature ~~~ Phone é.'..6)66~o Date \l ("¿(¡{D'S
p'RnR'R"¡ hv P ï n
Commission Use Only
Permit to Drill API Number: Permit APproval. . 0 See cover letter
Number: 2D3 .. 2.L:> ¥ 50-ID.3-2ð¥7~ -ÔC Date: 19//('1 {! ? for other requirements
Conditions of approval : Samples required o Yes ~~o Mud log requir{¡é! / DYes ßJ No
Hydrogen sulfide measures o Yes No Directional survey required .~Yes 0 No
\
Other: ~ÇOO {>":.' f'^'m.\ \f'-o.~ '" ~()\> ~~-\~ ~ \ ~ <:(l:.-Nt V\.. ~v Q \ r\"( to~.
Original Signed By BY ORDER OF /2/Í{i/t1¿
Approved by: .;;. ,. _CQMMISSIONER THE COMMISSION Date:
"""...... r CilII' . UKltilNAL I /
- . . .
Form 10 401 Revised 3/2003
Submit In duplicate
e
.cation for Permit to Drill, Well 2P-443
. Revision No.O
Saved: 25-Nov-03
Permit It - Meltwater Well #2P-443
Application for Permit to Drill Document
MQximizE
Well Vglu~
Table of Contents
1. Well Name .................... ........ ............ ......... ............... .................. ......... ...................... 2
Requirements of 20 AAC 25.005 (f)............... ..... ....... ....... ................. ....... ........... .......... ....... ........... .......2
2. Location Sum mary ....... ....... ............ ....... ............... .... ................ ............................... 2
Requirements of 20 AAC 25.005(c)(2) ...... ..... .................. ......... ................... ........ ................ ..................2
Requirements of 20 AAC 25.050(b )............................... ...... .......................... ...................... ................... 3
3. Blowout Prevention Equipment Information ......................................................... 3
Requirements of 20 AAC 25.005(c)(3) ......... ......... ..... ......... ........ ...... ...... ....... ..... .......... ............... ... ....... 3
4. Dri II i ng Hazards Information .......... ......... ................ ... ................... ......... ........ .... ..... 3
Requirements of 20 AAC 25.005 (c)(4) ..................................................................................................3
5. Procedure for Conducting Formation Integrity Tests ........................................... 4
Requirements of 20 AAC 25.005 (c)(5) ..................................................................................................4
6. Casi ng and Cementi ng Program ...... .... ........... ......................... .......... ..................... 4
Requirements of 20 AAC 25.005(c)(6) .... ................. ...... ........... ........ ...... ............ ...... ....... ....... ...... ......... 4
7. Diverter System Information ...................................................................................4
Requirements of 20 AAC 25.005(c)(7) ................................................................................................... 4
8. Dri II i ng FI uid Program . ......... ....... ..... ................. ................. ..... ....... ........... .............. 5
Requirements of 20 AAC 25.005(c)(B) ...................................................................................................5
Surface Hole Mud Program (extended bentonite) .................................................................................. 5
Production Hole Mud Program (LSND) .................................................................................................. 5
9. Abnormally Pressured Formation Information ......................................................5
Requirements of 20 AAC 25.005 (c)(9) .................................................................................................. 5
10. Seism ic Analysis ....... ....... .... ........... ........... ... ..... ....................... ..... ............. ............. 5
Requirements of 20 AAC 25.005 (c)(10) ................................................................................................5
11. Seabed Condition Analysis .....................................................................................6
Requirements of 20 AAC 25.005 (c)(11) ................................................................................................6
12. Evidence of Bonding ...............................................................................................6
ORIGINAL
2P-443 PERMIT IT. doc
Page 10f7
Printed: 25-Nov-03
fa
.ication for Permit to Drill, Well 2P-443
Revision No.O
Saved: 25-Nov-03
Requirements of 20 MC 25.005 (c)(12) ................................................................................................ 6
13. Proposed Drilling Program .....................................................................................6
Requirements of 20 AAC 25.005 (c)(13) ................................................................................................6
14. Discussion of Mud and Cuttings Disposal and Annular Disposal....................... 7
Requirements of 20 AAC 25.005 (c)(14) ................................................................................................7
15. Attachments..... .................... ..... ......... ........................ ... ............ .......... ...... ............... 7
Attachment 1 Directional Plan (13 pages) ..............................................................................................7
Attachment 2 Drilling Hazards Summary (1 page) ................................................................................. 7
Attachment 3 Cement Loads and CemCADE Summary (2 page) ......................................................... 7
Attachment 4 Well Schematics (1 page) ................................................................................................7
1. Well Name
Requirements of 20 AAC 25.005 (f)
Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission
under 20 MC 25.040(b). For a well with multiple well branche~ each brand¡ must similarly be identified by a unique name and API
number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the
commission.
The well for which this Application is submitted will be designated as 2P-443.
2. Location Summary
Requirements of 20 AAC 25.005(c)(2)
An application for a Permit to Drill must be accompanied by each of the following item~ except for an Item already on file with the
commission and identified in the application:
(2) a plat identifying the property and the property's owners and showing
(A)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth,
referenced to governmental section lines.
(B) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this
state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration;
(C) the proposed depth of the well at the top of each objective formation and at total depth;
Location at Surface I
NGS Coordinates
Northings: 5,868,881 Eastings: 443,640
998' FNL 1680' FWL, Section 17, T8N, R7E, UM
I RKB Elevation I 252' AMSL
I Pad Elevation I 224' AMSL
Location at Top of
Productive Interval
Bermuda Sand
NGS Coordinates
Northings: 5,861,912
2581' FSL, 133' FWL, Section 20, T8N, R7E, UM
Eastings: 442,064
9413
5298
5046
Location at Total De
NGS Coordinates
Northings: 5,861,283
Eastings: 441,922
1950' FSL 7' FEL Section 19 T8N R7E UM
Measured De th RKB:
Total Vertical De th RKB:
Total Vertical De th 55:
....~ 138
5630
5378
and
ORIGINAL
2P-443 PERMIT IT. doc
Page 2 of 7
Printed: 25-Nov-03
e
.cation for Permit to Drill, Well 2P-443
Revision No.O
Saved: 25-Nov-03
(D) other information required by 20 AAC 25.0S0(b),·
Requirements of 20 AAC 25.050(b)
If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10-401) must
(1) include a plat drawn to a suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 200
feet of any portion of the proposed well;
Please see Attachment 1: Directional Plan
and
(2) for all wells within 200 feet of the proposed well bore
(A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records,
and show that each named operator has been furnished a copy of the application by certified mai¿' or
(8) state that the applicant is the only affected owner.
The Applicant is the only affected owner.
3. Blowout Prevention Equipment Information
Requirements of 20 AAC 25.005(c)(3)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the
commission and identified in the application:
(3) a diagram and description ofthe blowout prevention equipment (BOPE) as required by 20 AAC 25.035, 20 AAC 25.036, or 20
AAC 25.037, as applicable;
An API 13 5/8" x 5,000 psi BOP stack (RSRRA) will be utilized to drill and complete well 2P-443. Please
see information on the Doyon Rig 141 blowout prevention equipment placed on file with the Commission.
4. Drilling Hazards Information
Requirements of 20 AAC 25.005 (c)(4)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the
commission and identified in the application:
(4) information on drilling hazards, including
(A) the maximum downhole pressure that may be encountered, criteria used to determine it and maximum potential surface
pressure based on a methane gradient;
The expected reservoir pressures in the Bermuda sands in the 2P-443 area vary from 0.26 to 0.38 psi/ft, *
or 5.1 to 7.2 ppg EMW (equivalent mud weight). These pressures are predicted based on actual bottom
hole pressure data from existing wells on the field together with reservoir model forecasts.
The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a
methane gradient (0.11) and the deepest planned vertical depth of the Bermuda sand formation is 1497
psi, calculated as follows:
MPSP =(5543 ft)(0.38 - 0.11 psi/ft)
=1497 psi .
(B) data on potenüal gas zones;
Due to the presence of high annular pressures on some of the Meltwater wells (2P-431, 451 & 438) there
is the risk of encountering a pressured shallow zone. This interval may be encountered through the C-80
formation to the top of the Bermuda. The original high pressures recorded in these annuli were of
concern but as can be seen from the following table a series of annular bleeds together with an observed
natural decline in pressures have reduced the potential maximum pressure considerably:
*
Original Latest
Well Surface Fluid C-80 C-80 Equivalent Surface Fluid C-80 C-80 Equivalent
Pressure Level Pressure Gradient (ppg) Pressure Level Pressure Gradient (ppq)
2P-431 1600 2387 1751 13.85 1200 193 1678 13.27
2P-451 1380 2160 1541 12.23 750 1392 1020 8.10
2P-438 879 895 1245 9.83 800 768 1216 9.60
ORIGINAL
2P-443 PERMIT IT. doc
Page 3 of 7
Printed: 25-Nov-03
e
.·cation for Permit to Drill, We1l2P-443
Revision No.O
Saved: 25-Nov-03
Using the latest annular pressures available the highest pressure that would be expected is approximately
1678 psi at 2391 ft 1VD or 13.5 ppg EMW. Most of the previously drilled Meltwater wells have had an
FIT/LOT of approximately 16 ppg thus indicating that this pressured interval, should it exist, can be safely
controlled with standard well control methods.
and
(C) data concerning potential causes of hole problems such as abnomlally geo-pressured strata, lost circulation zone!;~ and zones
that have a propensity for differential sticking;
Please see Attachment 2: Drilling Hazards Summary.
5. Procedure for Conducting Formation Integrity Tests
Requirements of 20 AAC 25.005 (c)(5)
An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file with the
commission and identified in the application:
(5) a description of the procedure for conducting formation integrity tests, as required under 20 MC 25.030(f);
2P-443 will be completed with 9 5/8" surface casing landed above the C-80 mudstone interval. The
casing shoe will be drilled out and a leak off test will be performed in accordance with the "Leak Off Test
Procedure" that ConocoPhillips Alaska placed on file with the Commission.
6. Casing and Cementing Program
Requirements of 20 AAC 25.005(c)(6)
An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file with the
commission and identified in the application:
(6) a complete proposed casing and cementing program as required by 20 AAC 25.03~ and a description of any slotted liner, pre-
perforated liner, or screen to be installed;
Casing and Cementing Program I
See also Attachment 3: Cement Summary
Hole Top Btm
CsgfTbg Size Weight Length MDfTVD MDfTVO
00 (in) (in) Oblft) Grade Connection (ftJ (ft) (ft) Cement PrOQram
16 42 62.5 H-40 Welded 80 28 / 28 108 / 108 Cemented to
surface with
410 sx Artic
Set!
9 5/8 12 V4 40 L-80 BTC 2863 28 / 28 2891/ 2316 Cement to
Surface with
546 sx AS Lite
Lead, 294 sx
LiteCRETE Tail
7 8 V2 26 L-80 BTCM 8887 28 / 28 8915 / 5071 Cement Top
planned @
4 V2 8 V2 12.6 L-80 IBTM 1223 8915 / 5071 10138 / 5630 8615' MD/
4933' 1VD.
Cemented w/
352 sx
LiteCRETE
7. Diverter System Information
Requirements of 20 AAC 25.005(c)(7)
An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file with the
commission and Identified in the application:
(7) a diagram and description of the diverter system as required by 20 MC 25.035" unless this requirement is waived by the
commission under 20 MC 25.035(h){2);
ORIGINAL
2P-443 PERMIT IT.doc
Page 4 of 7
Printed: 25-Nov-03
e
.·cation for Permit to Drill, Well 2P-443
, Revision No.O
Saved: 25-Nov-03
A 21 %",2000 psi annular with a 16" diameter diverter line will be the diverter system used in the drilling
of 2P-443. Please see diagrams of the Doyon 141 diverter system on file with the Commission.
8. Drilling fluid Program
Requirements of 20 AAC 25.005(c)(B)
An applicaäon for a Permit to Drill must be accompanied by each of the following Item~ except for an item already on file with the
commission and identified in the application:
(8) a drilling fluid program, including a diagram and desaiption of the drilling fluid system, as required by 20 AAC 25.033/
Drilling will be done with muds having the following properties over the listed intervals:
Surface Hole Mud Program (extended bentonite)
Spud to Base of Permafrost Base of Permafrost to 95/8"
Casin~ Point
Initial Value Final Value Initial Value Final Value
Density (ppg) 8.6 <9.2 <9.2* 9.6
Funnel Viscosity 250 250 150-200 55-65
(seconds)
Yield Point 35-45 35-45 30-35 12-15
(eP)
pH 9-9.5 9-9.5 9-9.5 9-9.5
API Filtrate 6 6 4-6 4-6
(ee /30 min))
Chlorides (mg/I) <600 <600 <600 <600
*9.6 ppg if hydrates are encountered
Production Hole Mud Program (LSND)
95/8" Casin¡ Shoe to TD
Initial Value Final Value
Density (ppg) 9.6 9.6
Yield Point 22-28 10-15
(eP)
pH 9-9.5 9-9.5
API Filtrate 4-6 4
(ee / 30 min»
HTHP @ 15d' (ee)) <12 <12
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Please
see information on file with the Commission for diagrams and descriptions of the fluid system of Doyon
Rig 141.
9. Abnormally Pressured formation Information
Requirements of 20 AAC 25.005 (c)(9)
An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file wIth the
commission and identified in the application:
(9) for an exploratory or stratigraphic test wel? a tabulation setting out the depths of predicted abnormally geo-pressured strata as
required by 20 AAC 25.033(f)/
Not applicable: Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
Requirements of 20 AAC 25.005 (c)(10)
An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on tì/e with the
commission and identified in the application:
(10) for an exploratory or stratigraphic test wel? a seismic refraction or reflection analysis as required by 20 AAC 25.061(a)/
Not applicable: Application is not for an exploratory or stratigraphic test well.
ORIGINAL
2P-443 PERMIT IT. doc
Page 5 of 7
Printed: 25-Nov-03
e
_cation for Permit to Drill, Well 2P-443
., Revision No.O
. Saved: 25-Nov-03
11. Seabed Condition Analysis
Requirements of 20 AAC 25.005 (c)(11)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on fìle with the
commission and identifìed in the application:
(11) for a well drilled from an offshore platform, mobile bottom-founded structure, jack-up rig, or floating drilling vessel, an analysis
of seabed conditions as required by 20 MC 25.061(b);
Not applicable: Application is not for an offshore well.
12. Evidence of Bonding
Requirements of 20 AAC 25.005 (c)(12)
An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on fìle with the
commission and identified in the application:
(12) evidence showing that the requirements of 20 MC 25.025 {80nding}have been met;
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
Requirements of 20 AAC 25.005 (c)(13)
An application for a Permit to Drill must be accompanied by each of the following Items, except for an item already on fìle with the
commission and identifìed in the application:
The proposed drilling program is listed below. Please refer also to Attachment 4, Well Schematics.
1. Move in / rig up Doyon Rig 141. Install 21-1/4" Annular with 16" diverter line and function test
(conductor has already been installed and cemented).
2. Spud and directionally drill 12 V4" hole to casing point at 2891' MD / 2316' TVD as per directional plan.
Run MWD tools as required for directional monitoring and LWD tools as required for data acquisition.
3. Run and cement 95/8",40# L-80, BTC casing to surface. Displace cement with mud. Perform top job if
required.
4. Remove diverter system and install wellhead and test. Install and test 13 5/8" x 5,000 psi BOP's and test
to 5000 psi (annular preventer to 3500 psi). Notify AOGCC 24 hrs before test.
5. PU 8 V2" bit and 6 %" drilling assembly, with MWD and LWD. RIH, clean out cement to top of float
equipment. Pressure test casing to 3500 psi for 30 minutes and record results.
6. Drill out cement and 20' of new hole. Perform LOT or FIT to 18.0 ppg EMW, recording results.
7. Directionally drill to 7" x 4 V2" casing point at 10138 MD /5630' TVD.
8. Run 7", 26# L-80, BTC Mod x 4 V2", 12.6# L-80, IBT Mod casing to TD. Pump cement and displace with
water and mud. Note that the cross over and seal bore extension for the completion will be positioned
200' MD above the Cairn interval, if present, as this is an interval that may be produced later in the life of
the field.
9. Make up completion string as required and RIH to depth. Locate seal bore extension, space out and land
completion. Pressure test completion and production casing to 3500 psi for 30 minutes and record
results. Shear RP shear valve in gas lift mandrel.
10. Install BPV, nipple down stack, nipple up and test tree to 5,000 psi. Pull BPV
11. Freeze protect well with diesel by pumping into the annulus, taking returns from tubing and allowing to
equalize. Carry out LOT and injection test on the outer annulus. Sweep the annulus with water and freeze
protect.
12. Set BPV and move rig off.
13. Rig up wire line unit. Pull BPV. Set dummy valve in place of RP shear valve in gas lift mandrel. Perform
MIT pressure tests of tubing and annulus (Tubing and annulus to 3500 psi).
14. Run cement bond log and perforate. Rig down wire line unit.
ORIGINAL
2P-443 PERMIT IT. doc
Page 6 of 7
Printed: 25-Nov-03
e
.·cation for Permit to Drill, Well 2P-443
Revision No.O
Saved: 25-Nov-03
15. Freeze protect well and turn well over to production.
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
Requirements of 20 AAC 25.005 (c)(14)
An application for a Permit to Drill mustc be accompanied by each of the following items, except for an item already on file with the
commission and identified in the application:
(14) a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the
operator intends to request authorization under 20 MC 25.080 for an annular disposal operation in the well.;
Waste fluids generated during the drilling process will be disposed of either by pumping authorized fluids
into a permitted annulus on 2P Pad, or by hauling the fluids to a KRU Class II disposal well. All cuttings
generated will be disposed of either down a permitted annulus on 2P Pad, hauled to the Prudhoe Bay
Grind and Inject Facility for temporary storage and eventual processing for injection down an approved
disposal well, or stored, tested for hazardous substances, and used on the pad in accordance with a
permit from the State of Alaska.
At the end of drilling operations, an application may be submitted to permit 2P-443 for annular disposal
of fluids occurring as a result of future drilling operations on 2P pad.
15. Attachments
Attachment 1 Directional Plan (13 pages)
Attachment 2 Drilling Hazards Summary (1 page)
Attachment 3 Cement Loads and CemCADE Summary (2 page)
Attachment 4 Well Schematics (1 page)
ORIGINAL
2P-443 PERMIT IT. doc
Page 70'7
Printed: 25-Nov-03
Cre<;Jted by bmrchaer
Dote plotted: 19-Nov-2003
Plot Refersnce- Is 2P-443 VflrfSI3.o.
Coordinates ore in feet re-ference slot 1443.
True Vertical Depths ore referetlce: RICB (Doyon 141).
..;:
INTEQ
e
e
ConocoPhillips Alaska, Inc.
Structure: Drill Site 2P
Well: 443
Field: Meltwater
Location : North Slope. Alaska
<- West (feet)
4000
3600
3200
2800
2400 2000
1600
1200
800
SURFACE LOCATION:
998' FNL. 1680' FWL
SEC. 17, T8N, R7E
Base Permafrost
.**Plane of Proposal***
192.31 AZIMUTH
7146' (TO TARGET)
4
TRUE
TARGET LOCATION:
2581' FSL, 133" FWL
SEC. 20, T8N, R7E
~
ConocoPhillips
400
.L-
Target-Top Bermuda(T3)
2P-443 Top Berm Tgt 22 Jul 03
Base West Sak
800
EOC
''';"/' 1200
9 5/8
CBO
1600
I 2000
2400
2800
3200 VJ
0
c
--
3600 ::r
~
--+.
CD
4000 CD
--
'--"
I
4400 V
4800
5200
5600
6000
6400
TO LOCATION:
1950' FSL, 7' FEL
SEC. 19, T8N, R7E
ORIGINAL
o
400
400
KOP
o
400
6800
7200
7600
8000
0
400
800
1200
1600
'"""'
......
0 Q)
Q) 2000
......
:::0 '-../
....c
- ...... 2400
a..
(j) Q)
0
-
Z 0 2800
Ü
» +=
I...
Q) 3200
r- >
Q)
:J 3600
I...
l-
I
V 4000
4400 -i
4800
5200
5600
6000
RKB Elevation: 252'
KOP
2.00
4.00
6.00 OlS: 2.00 deg per 100 It
6.00
Build 3/100
13.00
16.00
19.00 DlS: 3.00 deg per 100 ft
22.00
25.00
28.00 Base Permafrost
31.00
34.00
40.00
46.00 Bose West Sok
52.00
58.00
EOC
-2; 9 5/8 83ßing
o
400
800
1200
I
I ConocoPhillips Alaska, Inc.
~
ConocoPhillips
Structure : Drill SIte 2P
Field : Meltwater
Well : 443
Location : North Slope, Alaska
Created by bmichoel
Dote plotted: 20-Nov-2003
Plol Reference is 2P-443 Vers#3.a.
Coordinates ore in feet reference !!!Iot #443.
True Vertical Depths ore reference RKB (Doyon
_ ..11.1.
.,..
INTEQ
192.31 AZIMUTH
7146' (TO TARGET)
e
***Plone of Proposol***
C50
C37
e
T7
-~
7 X 4 1/2 XO
T4.1 (Top Cairn)
Target-Tap Bermuda(T3)
2P-443 Tap Berm Tgt 22 Jul 03
T2(Base Bermuda)
C35(Top Albian)
TD - Ccsing pt.
1600 2000 2400 2800 3200 3600 4000 4400 4800 5200 5600 6000 6400 6800 7200 7600 8000
Vertical Section (feet) ->
Azimuth 192.31 with reference 0.00 N, 0.00 E from slot #443
Created by bm1cnoel
Dote ploUed : 20-Nav-2003
Plol Reference is 2P-443 VersI/3.a.
Coordinates ore in feet reference slot '443.
hrue Vertical Depths ore reference RKB (Doyon 141).
I ..:
INTEQ
ConocoPhillips Alaska, Inc.
Structure : Drill Site 2P Well : 443
Field : Meltwater Location : North Slope, Alaska
........
ConocoPhillips
====
PROF~LE COMMENT DATA
-----
Point -----
MD
300.00
800.00
1388.19
2169.75
2559.62
2891.35
3055.36
4328.12
5001.67
o
:::0
-
GJ
-
Z
»
r-
KOP
Build 3/100
Base Permafrost
Base West Sak
EOC
9 5/8 Casing
C80
C50
C40
C37 5353.75
ì7 7300.06
7 x 4 1/2 XO 8915.15
T4.1(Top Cairn) 9115.15
Target-Top Bermuda(T 1#..V 9412.57
T2(Base Bermuda) 9948.35
C35(Top Albian) 10042.38
TD - Casino Pt. . 10138.35
Inc
0.00
10.00
27.65
51.09
62.79
62.79
62.79
62.79
62.79
62.79
62.79
62.79
62.79
62.79
62.79
62.79
62.79
Dir
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192..31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
TVD
300.00
North
0.00
797.47 -42.52
1352.00 -227.20
1952.00 - 708.19
2164.31 -1026.87
2316.00 -1315.11
2391.00 -1457.62
2973.00 -2563.49
3281.00 -3148.73
.3442.00 -3454.65
4332.00 -5145.76
5070.54 -6549.08
5162.00 -6722.86
5298.00 -6981.28
5543.00 -7446.81
5586.00 -7528.52
5629.88 -7611.90
East
0.00
-9.28
-49.58
-154.53
-224.06
-286.95
-318.04
-559.33
-687.03
- 753. 78
-1122.76
-1428.95
-1466.87
-1523.25
-1624.83
-1642.66
-1660.85
====
e
V. Sect
0.00
43.52
232.55
724.85
1051.03
1346.05
1491.91
2623.80
3222.81
3535.93
5266.83
6703.16
6881.03
7145.53
7622.01
7705.64
7790.99
Deg/100
0.00
2.00
3.00
3.00
3.00
0.001
0.00
0.00
0.00 e
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
onocoP
Al
.y,~
ConocQPhimps
Crooted by bmí-choe!
Date plotted ~ 20~Nov-2003
Plot R~f~fence ís 2P--443 V$'Si3~a.
$!01 #44-3_
(Doyon
Structure: Drill Site 2P
Field : Meltwater
TRUE NORTH
240
~
340
30
320
40
,
T 1100
60
~,.~
290
70
80
270
90
260
100
250
110
120
230
130
220
140
210
1 0
200
160
190 180 170
Normal Plane Travelling Cylinder - Fe
All depths shown ore Measured depths on R rence Well
<- West (feet)
520 480 440 400 360 320 280 240 200 160 120 80 40 U 40 80 120
Q?q'o,,1100 40
000
900
700 0
300
40
j 900 1000
!
80
11 120
100
!
l 300 1200f 160
!
/ I !
.1300 . 1400 1300,! 200
/ !
!
1500 ! 240
1400f (f)
! 0
! 280 C
500 I -+
1600 :::J
15001 ~
! 320 -
/ ! ill
/ ill
600 ! -+
'---"
700 !
/ 16001 I
/ V
/ I
I ! 400
700 !
¡ 1800 I
I !
440
17001
!
! 480
¿1800 !
¿1900 !
! 520
!
I 1800 ¿
I ! 560
/ !
1900
/ I !
/ 2000 ! 600
!
@ / !
/ !
640
1900 +
/ !
(!; 680
Con
Ala
(;rooted by bmkhael
Date pJotte:d 20-Nov....,2003
Plot ReferjJ!l1cl'i' is 2P""'44~ V~tJ3/J,
Coor.qincitss Off: ÍfI 1ßßt fafe.-sncBs!ot 1443"
Loccltion
Structure: Drill Site 2P
Field : Meltwat<;,r
rue VertÎcal
(Ooyoo
'9'",
ConocoPhimps
by bm!ct¡o.ef
D<1te pl"i;teci ; 20~Nov~2003
Plot ReferencE! ís 2P.,.,,443 Vers#3.<J.
1100
1000
900
I
I
I
I
I
@
¡J
(!;
800
/
2300
Structure: Drill Site 2P
onocoPhilli ps
field : Meltwater
<- West (feet)
700
600
Canoe
nips
/
I
I
I
/
/
/
/2300
¡
¡
¡
¡
2300
¡
/
2700
600
500
600
700
800
900
1000
1100
1200
1300 (f)
0
1400
,,--.,.,
-
(!)
1500 (!)
-i-
'-.../
I
1600 V
1700
1800
1900
2000
2100
2200
2300
2400
1900
Oat¢ plotted: 20~Nö\f- 2003
Plot Reference í-s 2P-A43 Ven>lf3,t:J,
Coordìr;ales ora in fßat r1ô:fanmcEi slQt 1443.
Vertical Depth5
RKI3(Ooyon
INTEQ
onocQPhilli pS
Structure: Drill 2P
Field : Meltwater
Well :
Location : North
Alaska
ø
<- West
3000 2700 2400 2100
1800
i 4500
@
I
i 4200
5100
5400
5700
/
¡ 5400
/
1>
/
/
I
/
3900
/
'3600
ø
!
!
. 4500
I
!
00
4200
4500
4800
5100
5400
5700
@
3:500
3600
5900
y
ConocoPhmips
300
600
2100
3000
2400
2700
3000
3300
3600
3900
4200
4500
(f)
4800 0
5100 ".-.,
-+.
(f)
(f)
-
5400 '-"
I
V
5700
6000
6300
6600
6900
- 7200
7500
7800
8100
;'700
e
e
ConocoPhillips Alaska, Inc.
Drill Site 2P
443
slot #443
Meltwater
North Slope, Alaska
PRO P 0 S ALL I S TIN G
by
Baker Hughes INTEQ
Your ref
Our ref
License
2P-443 Vers#3.a
prop4479
Date printed
Date created
Last revised
5-Sep-2003
23-Feb-2001
5-Sep-2003
Field is centred on 441964.235,5869891.466,999.00000,N
Structure is centred on 441964.235,5869891.466,999.00000,N
Slot location is n70 3 8.704,w150 27 3.668
Slot Grid coordinates are N 5868880.800, E 443640.260
Slot local coordinates are 997.96 S 1683.84 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
ORIGINAL
e
ConocoPhillips Alaska, Inc.
Drill Site 2P,443
Meltwater,North Slope, Alaska
Measured Inclin. Azimuth True Vert
Depth Degrees Degrees Depth
0.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
900.00
4.00
6.00
8.00
10.00
13 .00
1000.00
1100.00
1200.00
1300.00
1388.19
16.00
19.00
22.00
25.00
27.65
1400.00
1500.00
1600.00
1700.00
1800.00
28.00
31. 00
34.00
37.00
40.00
1900.00
2000.00
2100.00
2169.75
2200.00
43.00
46.00
49.00
51. 09
52.00
2300.00
2400.00
2500.00
2559.62
2891.35
55.00
58.00
61. 00
62.79
62.79
3000.00
3055.36
3500.00
4000.00
4328.12
62.79
62.79
62.79
62.79
62.79
4500.00
5000.00
5001.67
5353.75
5500.00
62.79
62.79
62.79
62.79
62.79
6000.00
6500.00
7000.00
7300.06
7500.00
62.79
62.79
62.79
62.79
62.79
8000.00
8500.00
8915.15
9000.00
9115.15
62.79
62.79
62.79
62.79
62.79
0.00
0.00
0.00
0.00
2.00
0.00
192.31
192.31
192.31
192.31
0.00
100.00
200.00
300.00
399.98
499.84
599.45
698.70
797.47
895.45
992.25
1087.61
1181. 27
1272.96
1352.00
1362.45
1449.47
1533.80
1615.20
1693.46
1768.34
1839.66
1907.21
1952.00
1970.81
2030.29
2085.47
2136.22
2164.31
2316.00
2365.68
2391. 00
2594.32
2822.96
2973.00
3051. 60
3280.24
3281. 00
3442.00
3508.88
3737.51
3966.15
4194.79
4332.00
4423.43
4652.07
4880.70
5070.54
5109.34
5162.00
R E C TAN G U L A R
COO R DIN ATE S
0.00 N
0.00 N
0.00 N
0.00 N
l.71S
6.82 S
15.33 S
27.24 S
42.52 S
62.00 S
86.46 S
115.83 S
150.05 S
189.00 S
227.20 S
232.59 S
280.69 S
333.18 S
389.91 S
450.72 S
515.46 S
583.93 S
655.95 S
708.19 S
731. 33 S
809.86 S
891. 32 S
975.50 S
1026.87 S
1315.11 S
1409.51 S
1457.62 S
1843.96 S
2278.40 S
2563.49 S
2712.84 S
3147.28 S
3148.73 S
3454.65 S
3581.72 S
4016.16 S
4450.60 S
4885.04 S
5145.76 S
5319.49 S
5753.93 S
6188.37 S
6549.08 S
6622.81 S
6722.86 S
0.00 E
0.00 E
0.00 E
0.00 E
0.37 W
1. 49 W
3.35 W
5.94 W
9.28 W
13 . 53 W
18.87 W
25.28 W
32.74 W
41. 24 W
49.58 W
50.75 W
61. 25 W
72.70 W
85.08 W
98.35 W
112.47 W
127.41 W
143.13 W
154.53 W
159.58 W
176.71 W
194.48 W
212.85 W
224.06 W
286.95 W
307.55 W
318.04 W
402.34 W
497.13 W
559.33 W
591. 92 W
686.71 W
687.03 W
753.78 W
781. 50 W
876.29 W
971. 08 W
1065.88 W
1122.76 W
1160.67 W
1255.46 W
1350.25 W
1428.95 W
1445.04 W
1466.87 W
Dogleg
Deg/100ft
e
PROPOSAL LISTING Page 1
Your ref 2P-443 Vers#3.a
Last revised 5-Sep-2003
Vert
Sect
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00 KOP
1. 75
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
192.31
2.00
2.00
2.00
2.00
3.00
6.98
15.69
27.88
43.52
63.46
3.00
3.00
3.00
3.00
3.00
88.49
118.56
153.58
193.45
232.55 Base Permafrost
3.00
3.00
3.00
3.00
3.00
238.06
287.30
341.02
399.09
461.33
3.00
3.00
3.00
3.00
3.00
527.58
597.67
671 .39
724.85 Base West Sak
748.54
3.00
3.00
3.00
3.00
0.00
828.92
912.30
998.45
1051. 03 EOC
1346.05 9 5/8" Casing
0.00
0.00
0.00
0.00
0.00
1442.68
1491.91 C80
1887.34
2332.00
2623.80 C50
0.00
0.00
0.00
0.00
0.00
2776.66
3221. 33
3222.81 C40
3535.93 C37
3665.99
0.00
0.00
0.00
0.00
0.00
4110.65
4555.31
4999.98
5266.83 T7
5444.64
0.00
0.00
0.00
0.00
0.00
5889.30
6333.96
6703.16 7 x 4 1/2 XO
6778.62
6881.03 T4.1(Top Cairn}
All data is in feet unless otherwise stated.
Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level).
Bottom hole distance is 7790.99 on azimuth 192.31 degrees from wellhead.
Total Dogleg for wellpath is 62.79 degrees.
Vertical section is from wellhead on azimuth 192.31 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ORIGINAL
e
e
ConocoPhillips Alaska, Inc. PROPOSAL LISTING Page 2
Drill Site 2P,443 Your ref 2P-443 Vers#3.a
Meltwater,North Slope, Alaska Last revised 5-Sep-2003
Measured Inclin. Azimuth True Vert R E C TANGU L A R Dogleg Vert
Depth Degrees Degrees Depth C 0 0 RDINA T E S Deg/lOOft Sect
9412.57 62.79 192.31 5298.00 6981. 2 8 S 1523.25 W 0.00 7145.53 2P-443 Top Berm Tgt 22 Jul 03
9500.00 62.79 192.31 5337.98 7057.25 S 1539.83 W 0.00 7223.29
9948.35 62.79 192.31 5543.00 7446.81 S 1624.83 W 0.00 7622.01 T2(Base Bermuda)
10000.00 62.79 192.31 5566.62 7491.69 S 1634.62 W 0.00 7667.95
10042.38 62.79 192.31 5586.00 7528.52 S 1642.66 W 0.00 7705.64 C35(Top Albian)
10138.35 62.79 192.31 5629.88 7611. 90 S 1660.85 W 0.00 7790.99 TD - Casing Pt.
All data is in feet unless otherwise stated.
Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level).
Bottom hole distance is 7790.99 on azimuth 192.31 degrees from wellhead.
Total Dogleg for wellpath is 62.79 degrees.
Vertical section is from wellhead on azimuth 192.31 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
ORIGINAL
e
e
ConocoPhillips Alaska, Inc.
Drill Site 2P,443
Meltwater,North Slope, Alaska
PROPOSAL LISTING Page 3
Your ref 2P-443 Vers#3.a
Last revised: 5-Sep-2003
Comments in wellpath
--------------------
--------------------
MD
TVD
Rectangular Coords.
Comment
-----------------------------------------------------------------------------------------------------------
300.00 300.00 0.00 N 0.00 E KOP
1388.19 1352.00 227.20 S 49.58 W Base Permafrost
2169.75 1952.00 708.19 S 154.53 W Base West Sak
2559.62 2164.31 1026.87 S 224.06 W EOC
2891. 35 2316.00 1315.11 S 286.95 W 9 5/8" Casing
3055.36 2391.00 1457.62 S 318.04 W C80
4328.12 2973.00 2563.49 S 559.33 W C50
5001.67 3281. 00 3148.73 S 687.03 W C40
5353.75 3442.00 3454.65 S 753.78 W C37
7300.06 4332.00 5145.76 8 1122.76 W T7
8915.15 5070.54 6549.08 8 1428.95 W 7 x 4 1/2 XO
9115.15 5162.00 6722.86 8 1466.87 W T4.1(Top Cairn)
9412.57 5298.00 6981. 28 8 1523.25 W 2P-443 Top Berm Tgt 22 Jul 03
9948.35 5543.00 7446.81 8 1624.83 W T2(Base Bermuda)
10042.38 5586.00 7528.52 8 1642.66 W C35(Top Albian)
10138.35 5629.88 7611.90 8 1660.85 W TD - Casing Pt.
Targets associated with this wellpath
-------------------------------------
-------------------------------------
Target name Geographic Location T.V.D. Rectangular Coordinates Revised
-----------------------------------------------------------------------------------------------------------
2P-443 Top Berm Tgt 442064.000,5861912.000,999.00 5298.00
6981. 288
1523.25W 22-Feb-2001
ORIGINAL
e
e
ConocoPhillips Alaska, Inc.
Drill Site 2P
443
slot #443
Meltwater
North Slope, Alaska
PRO P 0 S ALL 1ST I N G
by
Baker Hughes INTEQ
Your ref
Our ref
License
2P-443 Vers:ft3.a
prop4479
Date printed
Date created
Last revised
19-Nov-2003
23-Feb-200l
19-Nov-2003
Field is centred on 441964.235,5869891. 466.999.00000. N
Structure is centred on 44l964.235,586989l.466,999.00000.N
Slot location is n70 3 8.704.w150 27 3.668
Slot Grid coordinates are N 5868880.800, E 443640.260
Slot local coordinates are 997.96 S 1683.84 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
ORIGINAL
e
e
ConocoPhillips Alaska, Inc. PROP08AL LI8TING Page 1
Drill Site 2P,443 Your ref 2P-443 Vers#3.a
Meltwater,North Slope, Alaska Last revised : 19-Nov-2003
Measured Inclin Azimuth True Vert R E C TAN GULAR G RID C o 0 R D 8 G E 0 G RAP HIe
Depth Degrees Degrees Depth C 0 0 R DIN ATE 8 Easting Northing C 0 0 R DIN ATE 8
0.00 0.00 0.00 0.00 O.OON O.OOE 443640.26 5868880.80 n70 3 08.70 w150 27 03.67
100.00 0.00 192.31 100.00 O.OON O.OOE 443640.26 5868880.80 n70 3 08.70 w150 27 03.67
200.00 0.00 192.31 200.00 O.OON O.OOE 443640.26 5868880.80 n70 3 08.70 w150 27 03.67
300.00 0.00 192 .31 300.00 O.OON O.OOE 443640.26 5868880.80 n70 3 08.70 w150 27 03.67
400.00 2.00 192.31 399.98 1. 718 0.37W 443639.87 5868879.10 n70 3 08.69 w150 27 03.68
500.00 4.00 192.31 499.84 6.828 1.49W 443638.72 5868873.99 n70 08.64 w150 27 03.71
600.00 6.00 192.31 599.45 15.338 3.35W 443636.80 5868865.49 n70 08.55 w150 27 03.76
700.00 8.00 192.31 698.70 27.248 5.94W 443634.11 5868853.61 n70 08.44 w150 27 03.84
800.00 10.00 192.31 797 .47 42.528 9.28W 443630.66 5868838.35 n70 08.29 w150 27 03.94
900.00 13 .00 192.31 895.45 62.008 13 .53W 443626.26 5868818.91 n70 08.09 w150 27 04.06
1000.00 16.00 192.31 992.25 86.468 18.87W 443620.74 5868794.50 n70 3 07.85 w150 27 04.21
1100.00 19.00 192.31 1087.61 115.838 25.28W 443614 .10 5868765.17 n70 3 07.56 w150 27 04.40
1200.00 22.00 192.31 1181. 27 150.058 32.74W 443606.38 5868731. 02 n70 3 07.23 w150 27 04.61
1300.00 25.00 192.31 1272.96 189.008 41.24W 443597.58 5868692.14 n70 3 06.84 w150 27 04.86
1388.19 27.65 192.31 1352.00 227.208 49.58W 443588.96 5868654.00 n70 3 06.47 w150 27 05.10
1400.00 28.00 192 .31 1362.45 232.598 50.75W 443587.74 5868648.63 n70 06.42 w150 27 05.13
1500.00 31. 00 192.31 1449.47 280.698 61. 25W 443576.88 5868600.61 n70 05.94 w150 27 05.43
1600.00 34.00 192.31 1533.80 333.188 72.70W 443565.03 5868548.21 n70 05.43 w150 27 05.76
1700.00 37.00 192.31 1615.20 389.918 85.08W 443552.22 5868491.59 n70 04.87 w150 27 06.12
1800.00 40.00 192.31 1693.46 450.728 98.35W 443538.49 5868430.88 n70 04.27 w150 27 06.50
1900.00 43.00 192.31 1768.34 515.468 112.47W 443523.87 5868366.27 n70 03.63 w150 27 06.91
2000.00 46.00 192.31 1839.66 583.938 127.41W 443508.41 5868297.92 n70 02.96 w150 27 07.34
2100.00 49.00 192.31 1907.21 655.958 143 .13W 443492.15 5868226.02 n70 02.25 w150 27 07.79
2169.75 51.09 192.31 1952.00 708.198 154.53W 443480.36 5868173.88 n70 01. 74 w150 27 08.12
2200.00 52.00 192.31 1970.81 731.338 159.58W 443475.13 5868150.77 n70 01.51 w150 27 08.27
2300.00 55.00 192.31 2030.29 809.868 176.71W 443457.40 5868072.39 n70 3 00.74 w150 27 08.76
2400.00 58.00 192.31 2085.47 891. 328 194.48W 443439.01 5867991. 07 n70 2 59.94 w150 27 09.27
2500.00 61. 00 192.31 2136.22 975.508 212.85W 443420.00 5867907.05 n70 2 59.11 w150 27 09.80
2559.62 62.79 192.31 2164.31 1026.878 224.06W 443408.40 5867855.76 n70 2 58.60 w150 27 10.13
2891.35 62.79 192.31 2316.00 1315.118 286.95W 443343.32 5867568.04 n70 2 55.77 w150 27 11. 94
3000.00 62.79 192 .31 2365.68 1409.518 307.55W 443322.01 5867473.81 n70 54.84 w150 27 12.53
3055.36 62.79 192.31 2391. 00 1457.628 318.04W 443311.15 5867425.79 n70 54.37 w150 27 12.84
3500.00 62.79 192 .31 2594.32 1843.968 402.34W 443223.92 5867040.14 n70 50.57 w150 27 15.27
4000.00 62.79 192.31 2822.96 2278.408 497.13W 443125.83 5866606.48 n70 46.30 w150 27 18.00
4328.12 62.79 192.31 2973.00 2563.498 559.33W 443061. 46 5866321.89 n70 43.49 w150 27 19.79
4500.00 62.79 192.31 3051. 60 2712.848 591. 92W 443027.74 5866172.81 n70 2 42.02 w150 27 20.73
5000.00 62.79 192.31 3280.24 3147.288 686.71W 442929.65 5865739.15 n70 2 37.75 w150 27 23.46
5001.67 62.79 192.31 3281. 00 3148.738 687.03W 442929.32 5865737.70 n70 2 37.74 w150 27 23.47
5353.75 62.79 192.31 3442.00 3454.658 753.78W 442860.25 5865432.33 n70 2 34.73 w150 27 25.39
5500.00 62.79 192.31 3508.88 3581. 728 781. 50W 442831. 56 5865305.48 n70 2 33.48 w150 27 26.19
6000.00 62.79 192.31 3737.51 4016.168 876.29W 442733.47 5864871.82 n70 2 29.21 w150 27 28.92
6500.00 62.79 192.31 3966.15 4450.608 971.08W 442635.38 5864438.15 n70 2 24.93 w150 27 31. 65
7000.00 62.79 192 .31 4194.79 4885.048 1065.88W 442537.29 5864004.49 n70 2 20.66 w150 27 34.38
7300.06 62.79 192.31 4332.00 5145.768 1122.76W 442478.43 5863744.24 n70 2 18.10 w150 27 36.02
7500.00 62.79 192.31 4423.43 5319.498 1160.67W 442439.21 5863570.82 n70 2 16.39 w150 27 37.11
8000.00 62.79 192.31 4652.07 5753.938 1255.46W 442341.12 5863137.16 n70 2 12.11 w150 27 39.84
8500.00 62.79 192.31 4880.70 6188.378 1350.25W 442243.03 5862703.50 n70 2 07.84 w150 27 42.57
8915.15 62.79 192 .31 5070.54 6549.08S 1428.95W 442161. 58 5862343.42 n70 2 04.29 w150 27 44.84
9000.00 62.79 192.31 5109.34 6622.818 1445.04W 442144.94 5862269.83 n70 2 03.57 w150 27 45.30
9115.15 62.79 192.31 5162.00 6722.868 1466.87W 442122.35 5862169.96 n70 2 02.58 w150 27 45.93
All data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level).
Bottom hole distance is 7790.99 on azimuth 192.31 degrees from wellhead.
Total Dogleg for wellpath is 62.79 degrees.
Vertical section is from wellhead on azimuth 192.31 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hughes INTEQ
ORIGINAL
e
e
ConocoPhillips Alaska, Inc. PROPOSAL LISTING Page 2
Drill Site 2P,443 Your ref 2P-443 Vers#3. a
Mel twater I North Slope, Alaska Last revised : 19-Nov-2003
Measured Inclin Azimuth True Vert R E CTANGULAR G RID COO R D S G E 0 G RAP H I C
Depth Degrees Degrees Depth C 0 o R DIN ATE S Easting Northing C 0 0 R DINATE S
9412.57 62.79 192.31 5298.00 6981.28S 1523.25W 442064.00 5861912.00 n70 2 00.04 w150 27 47.55
9500.00 62.79 192 . 31 5337.98 7057.25S 1539.83W 442046.85 5861836.17 n70 1 59.30 w150 27 48.03
9948.35 62.79 192.31 5543.00 7446.81S 1624.83W 441958.89 5861447.30 n70 1 55.46 w150 27 50.47
10000.00 62.79 192.31 5566.62 7491.69S 1634.62W 441948.76 5861402.50 n70 1 55.02 w150 27 50.76
10042.38 62.79 192.31 5586.00 7528.52S 1642.66W 441940.44 5861365.74 n70 1 54.66 w150 27 50.99
10138.35 62.79 192.31 5629.88 7611.90S 1660.85W 441921.62 5861282.51 n70 1 53.84 w150 27 51. 51
All data in feet unless otherwise stated. Calculation uses minimum curvature method.
Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level).
Bottom hole distance is 7790.99 on azimuth 192.31 degrees from wellhead.
Total Dogleg for wellpath is 62.79 degrees.
Vertical section is from wellhead on azimuth 192.31 degrees.
Grid is alaska - Zone 4.
Grid coordinates in FEET and computed using the Clarke - 1866 spheroid
Presented by Baker Hughes INTEQ
ORIGINAL
e
ConocoPhillips Alaska, Inc.
Drill 5ite 2P,443
Meltwater,North Slope, Alaska
MD
TVD
- - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -- - - - - - - - --- ----
300.00
800.00
1388.19
2169.75
2559.62
2891.35
3055.36
4328.12
5001.67
5353.75
7300.06
8915.15
9115.15
9412.57
9948.35
10042.38
10138.35
300.00
797.47
1352.00
1952.00
2164.31
2316.00
2391.00
2973.00
3281.00
3442.00
4332.00
5070.54
5162.00
5298.00
5543.00
5586.00
5629.88
Top MD Top TVD
e
PROP05AL LI5TING Page 3
Your ref 2P-443 Vers#3.a
Last revised : 19-Nov-2003
Comments in wellpath
--------------------
--------------------
Rectangular Coords.
O.OON
42.525
227.205
708.195
1026.875
1315.115
1457.625
2563.495
3148.735
3454.655
5145.765
6549.085
6722.865
6981. 285
7446.815
7528.525
7611. 905
Comment
O.OOE KOP
9.28W Build 3/100
49.5SW Base Permafrost
154.53W Base West Sak
224.06W EOC
286.95W 9 5/8" Casing
318.04W C80
559.33W C50
687.03W C40
753.78W C37
1122.76W T7
1428.95W 7 x 4 1/2 XO
1466.87W T4.1(Top Cairn}
1523.25W 2P-443 Top Berm Tgt 22 Ju1 03
1624.83W T2 (Base Bermuda)
1642.66W C35(Top Albian}
1660.85W TD - Casing Pt.
Casing positions in string 'A'
------------------------------
------------------------------
0.00
O.OON
Rectangular Coords.
1315.115
Bot MD Bot TVD
Rectangular Coords.
Casing
0.00
- - - -- - - - - - - - - - - - - - - - -- - - - - -- - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -- - - - - - --
286.95W 9 5/8' Casing
Target name
O.OOE 2891.35 2316.00
Targets associated with this wellpath
-------------------------------------
-------------------------------------
Geographic Location
6981.285
Rectangular Coordinates
1523.25W 22-Feb-2001
T.V.D.
Revised
- - -- - - - -- - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - -- - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - -- - - - - --
2P-443 Top Berm Tgt 442064.000,5861912.000,999.00 5298.00
ORIGINAL
taker Hughes Incorporat.
Anticollision Report
--.
Cum pan)':
Field:
Reference Sile:
Reference Well:
Reference Wellpalh:
ConocoPhillips Alaska, Inc.
Meltwater
2P Pad
443
2P-443 Vers#3a
Dal;': 11/20/2003 Time: 14:00:25
I'al:e: I
Co-ordinate(:'IiE) I{eference: Well: 443, True North
\'erlkal (T\'D) Reference: Doyon 141 (old2) 252.0
Db: Oracle
. _. on.. .n.. ....
......
..-... -.---.-..--.--.-- ..... ..---
----...... .. . -.---.-.
.. _______n_..
--,-
---.--.-.---.. -.----
__.. . n_...
-....
..-.. .
NO GLOBAL SCAN: Using user defined setection & scan criteria
Interpotation Method: MD Interval: 25.00 ft
Depth Range: 0.00 to 10138.35 ft
Maximum Radius: 5280.00 ft
Reference:
Error Model:
Scan Method:
Error Surface:
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Survey Program for Definitive Wellpath
Date: 9/27/2002 Validated: No
ptanned From To Survey
ft ft
0.00 10138.35 Planned: 2P-443 Vers#3a V5
Version: 1
Toolcode
Tool Name
MWD+SAG
MWD + Sag correction
Casing Points
MD TVD.·· Diameter Hole Size ...Name
ft ft in in
------
2891.35 2316.00 9.625 12.250 95/8"
10138.35 5629.89 7.000 8.500 7"
:>..;"'_..
¡'f'
Summary
<----------:-~()ffset Wellpath --,--..,...::¥->':f .' '..>' . ,,,,,,>,. . ...>" Reference . Offset Ctr-Ctr No-Go Allowahle
Site .. Well Wellpil.th :;"". 1\1D MD Distance Area Deviation Warning
. ft. . ·It ft ft ft
--
2P Pad 406 2P-406 Vers#2.A V2 Pia 389.88 400.00 740.70 8.00 732.70 Pass: Major Risk
2P Pad 414 2P-414 Vers#3a V1 Plan 391.89 400.00 580.56 8.03 572.53 Pass: Major Risk
2P Pad 415 2P-415 VO 299.95 300.00 560.32 5.81 554.51 Pass: Major Risk
2P Pad 415 2P-415A VO 299.95 300.00 560.32 5.81 554.51 Pass: Major Risk
2P Pad 416 2P-416 Version#O.A VO 392.41 400.00 540.47 8.04 532.43 Pass: Major Risk
2P Pad 417 2P-417 VO 346.24 350.00 522.27 7.00 515.27 Pass: Major Risk
2P Pad 419 2P-419Vers#3.A V1 Pia 323.31 325.00 480.38 6.54 473.84 Pass: Major Risk
2P Pad 420 2P-420 VO 370.06 375.00 461.23 6.96 454.27 Pass: Major Risk
2P Pad 422 2P-422 V7 347.01 350.00 419.90 6.53 413.37 Pass: Major Risk
2P Pad 422 422A VO 347.01 350.00 419.90 6.53 413.37 Pass: Major Risk
2P Pad 424 2P-424 Vers#3.b V1 Pia 347.27 350.00 380.25 7.09 373.16 Pass: Major Risk
2P Pad 427 2P-427 VO 395.35 400.00 320.89 7.29 313.60 Pass: Major Risk
2P Pad 429 2P-429 VO 323.97 325.00 281.36 6.48 274.88 Pass: Major Risk
2P Pad 431 2P-431 V1 396.44 400.00 238.64 7.54 231.10 Pass: Major Risk
2P Pad 432 2P-432 V11 396.75 400.00 220.68 8.08 212.60 Pass: Major Risk
2P Pad 434 2P-434 Vers#9b V1 Plan 397.30 400.00 180.57 8.12 172.46 Pass: Major Risk
2P Pad 438 2P-438 VO 2458.70 2550.00 117.79 54.55 63.23 Pass: Major Risk
2P Pad 441 2P-441 VO 399.33 400.00 40.63 7.69 32.94 Pass: Major Risk
2P Pad 445 2P-445 Vers#4 VO Plan: 525.80 525.00 39.52 10.13 29.39 Pass: Major Risk
2P Pad 447 2P-447 Vers#8b V2 Plan 754.09 750.00 80.58 14.19 66.39 Pass: Major Risk
2P Pad 448 2P-448 V2 502.71 500.00 101.57 9.37 92.20 Pass: Major Risk
2P Pad 448 2P-448A VO 502.71 500.00 101.57 9.37 92.20 Pass: Major Risk
2P Pad 448 2P-448PB1 VO 502.71 500.00 101.57 9.37 92.20 Pass: Major Risk
2P Pad 449 2P-449 VerS#6.b V1 Pia 401.85 400.00 120.60 7.92 112.68 Pass: Major Risk
2P Pad 451 2P-451 VO 325.62 325.00 160.49 6.34 154.15 Pass: Major Risk
Meltwater North#1 MWN#1 MWN#1 VO 8610.11 4950.00 1582.26 294.73 1287.53 Pass: Major Risk
Meltwater South #1 MWS#1 MWS#1 VO Out of range
MWN#2 MWN#2 MWN#2 VO 2588.79 4125.00 4200.10 83.02 4117.08 Pass: Major Risk
MWN#2 MWN#2 MWN#2A VO 2500.00 5375.00 3900.19 108.42 3791.76 Pass: Major Risk
ORIGINAL
e
e
MEL TW A TER - DRILLING HAZARDS SUMMARY
12 1,4" Open Hole & 9 5/8" Surface Casin2 Interval
Event Risk Level Mitigation Strategy / Contingency
Broach of conductor Low Monitor cellar continuously during interval
Gas Hydrates Low If observed - control drill, reduce pump rates,
reduce drilling fluid temperatures, additions of
Lecithin
Running sands & gravel Moderate Maintain planned mud parameters, Increase
mud weight/viscosity, Use weighted sweeps,
monitor fill on connections
Drill surface hole into shallow Low Do not exceed the surface hole TD as detailed
pressured interval- C-80 in the individual well plans, ensure that all
charged stands (in the derrick or in the hole) are
accounted for at all times
Hole swabbingfTight hole on Moderate Circulate hole clean prior to trip, proper hole
trips filling (use of trip sheets), pumping out of hole
as needed
Stuck surface casing Low Clean the hole before running casing, pump
hiQh density hiQh viscosity sweeps, wiper trip
Stuck pipe Low Keep hole clean, use high density high viscosity
sweeps, keep pipe moving/rotating with pumps
on whenever possible
Lost circulation Low Keep hole clean. If losses occur - reduce pump
rates and mud rheoloQY, use LCM
8 Vi' Open Hole & 7" x 4 Iii' Production Casin2 Interval
Event
Drill through a shallow
pressured interval: C-80 to
C-37
Insufficient or undetermined
LOT
Risk Level
Moderate
Moderate
High ECD / Tight hole on
trips/ Swabbing
Moderate
Differential sticking
Moderate
Barite sa
Lost circulation
Low
High
Miti ation Strate / Contin enc
Carry out well control drills. Kill fluid stored on
location, contingency 7" casing string on location,
hei htened awareness
Importance of LOT communicated to all parties, all
parties familiar with LOT procedure. Test will be
carried out until leak off is observed or to an FIT of
18 MW e uivalent
Condition mud & clean hole prior to trips. Monitor
ECDs with PWD tool while drilling across reservoir
interval. Hole cleaning best practices. Backream out
on trips as a last resort, proper hole filling (use of trip
sheets
Keep hole clean, periodic wiper trips, keep pipe
movin /rotatin with urn s on whenever ossible
Good drillin ractices as documented in well Ian
Pretreat mud before drilling reservoir section, keep
hole clean - use PWD to monitor hole cleaning. If
losses occur - reduce pump rates and mud
rheolo ,use LCM
Meltwater Drilling Hazards Summary
Prepared by Philip Hayden
11125/2003
ORIGINAL
->f
.*
-*ß>
Rig: Doyon 141
Location: Kuparuk (Meltwater)
Client: ConocoPhillips Alaska, Inc.
Revision Date: 11/17/2003
Prepared by: Mike Martin
Location: Anchorage, AK
Phone: (907) 265-6205
Mobile: (907) 229-6266
email: martin13@slb.com
< TOC at Surface
Previous Csg.
< 16",62.6#, H-40 grade
Welded Connection
at 108 ft. MD
< Base of Permafrost
at 1,388 ft. MD
(1,352 ft. TVD)
< Top of Tail at
1,491 ft. MD
< 95/8",40.0#, L-80 grade
BTC, AB Modified
in 12 1/4" OH
TO at 2,891 ft. MD
(2,316 ft. TVD)
Mark of Schlumberger
~
2P-443
CemCADE" Preliminary Job Design
95/8" Surface Casing
s
Preliminary Job Design based on limited input data. For estimate purposes only.
Volume Calculations and Cement Svstems
(Volumes are based on 450% excess in the permafrost and 45% excess below the
permafrost. Top of tail slurry is designed to be 103' below base of permafrost.)
Lead Slurrv (minimum pump time 220 min.)
ArcticSet III Lite @ 10.7 ppg, - 4.28 ft3/sk
0.7632 ft31ft x (108') x 1.00 (no excess) =
0.3132ft31ft x (1388' -108') x 5.50 (450% excess) =
0.3132 ft31ft x (1491' -1388') x 1.45 (45% excess) =
82.4ft3 + 2204.9 ft3+ 46.8 ft3 =
2334.1 ft3/ 4.28 ft3/sk =
Round up to 546 sks
82.4 ft3
2204.9 ft3
46.8 ft3
2334.1 ft3
545.4 sks
Have 410 sks of additional Lead on location for Top Out stage, if necessary.
Tail Slurrv (minimum pump time 160 min.)
LiteCRETE @ 12.0 ppg - 2.28 ft3/sk
0.3132 ft3/ft x (2891' - 1491') x 1.45 (45% excess) =
0.4257 ft31ft x 80' JShoe Joint) =
635.8 ft3 + 34.1 ft =
669.9 ft31 2.28 ft3/sk =
Round up to 294 sks
635.8 ft3
34.1 ft3
669.9 ft3
293.8 sks
BHST = 56°F, Estimated BHCT = 73°F.
(BHST calculated using a gradient of 2 SF/1 00 ft. below the permafrost)
PUMP SCHEDULE
Stage
Pump Rate
(bpm)
Stage
Volume
Cumulative
Stage Time Time
(min)
(bbl) (min)
CW100 5 10 2.0 2.0
Pressure test lines 10.0 12.0
CW100 5 30 6.0 18.0
MudPUSH II 6 40 6.7 24.7
Drop Bottom Plug 4.0 28.7
Lead Slurry 7 416 59.4 88.1
Tail Slurry 5 119 23.8 111.9
Drop Top Plug 4.0 115.9
Water 5 20 4.0 119.9
XO to rig pumps 4.0 123.9
Displacement 7 193 27.6 151.5
Bump Plug 3 20 6.7 158.2
MUD REMOVAL
Recommended Mud Properties: 9.6 ppg, Pv < 15, Ty < 15. As thin and light as possible
to aid in mud removal during cementing.
Spacer Properties: 10.5 ppg MudPUSH* II, Pv? 17-20, Ty ? 20-25
Centralizers: Recommend 2 on shoe track and 1 per joint for next 700' to assist in mud
removal.
ORJGJNAL
Rig: Doyon 141
Location: Kuparuk (Meltwater)
Client: ConocoPhillips Alaska, Inc.
Revision Date: 11/17/2003
Prepared by: Mike Martin
Location: Anchorage, AK
Phone: (907) 265-6205
Mobile: (907) 229-6266
email: martin13@slb.com
Previous Csg.
< 95/8",40.0#, L-80 grade
STC, AS Modified
at 2,891 ft. MD
< 7", 26.0#, L-BO grade
STC, AS Modified
in 8 1/2" OH
< Top ofTail at
8,615 ft. MD
< X-over at 8,915 ft. MD
< Top of Caim Fm.
at 9,115 ft. MD
< 41/2",11.6#, L-80grade
1ST Modified
in 81/2" OH
TD at 10,138 ft. MD
(5,630 ft. TVD)
Mark of Schlumberger
~
2P-443
CemCADE" Preliminary Job Design
7" x 4 1/2" Casing
Schlumb8Pg8P
Preliminary Job Design based on limited input data. For estimate purposes only.
Volume Calculations and Cement Systems
Volumes are based on 75% excess. Top of tail slurry is designed to be 500' above top of
Cairn formation.
Tail Slurry (minimum thickening time 161 min.~
LiteCRETE wI D600G, D065 @ 12.5 ppg, 2.2 ft Isk
0.1268 ft3/ft x 300' x 1.75 (75% excess) =
0.3272 ft3/ft x (10138' - 8915') x 1.75 (75% excess) =
0.0873 ft3/ft x 80' ~Shoe Joint) =
66.6 ft3 + 700.3 ft + 7 ft3 =
773.9 ft31 2.2 ft3/sk =
Round up to 352 sks
66.6 ft3
700.3 ft3
7 ft3
773.9 ft3
351.8 sks
BHST = 139°F, Estimated BHCT = 119°F.
(BHST calculated using a gradient of 2.5°F/100 ft. below the permafrost)
PUMP SCHEDULE
Stage
Pump Rate
(bpm)
Stage
Volume
Cumulative
Stage Time Time
(min)
(bbl) (min)
CW100 5 10 2.0 2.0
Pressure test lines 10.0 12.0
CW100 5 50 10.0 22.0
Drop wiper Plug 5.0 27.0
MudPUSH II 6 30 5.0 32.0
Tail Slurry 7 138 19.7 51.7
Drop Top Plug 5.0 56.7
Displacement 8 344 43.0 99.7
Bump Plug 3 15 5.0 104.7
MUD REMOVAL
Recommended Mud Properties: 9.6 ppg, Pv < 15, Ty < 15. As thin and light as possible
to aid in mud removal during cementing.
Spacer Properties: 10.5 ppg MudPUSH* II, Pv? 16-20, Ty? 30-33
Centralizers: Recommend 1- Y2 bow centralizers per joint from TD to TOC to aid in good
mud removal for proper cement placement.
ORIGINAL
Meltwater 2P-443 In~tor
Proposed Completion Schematic
4-1/2" Completion String
30" x 16" 62.6#
@ +1- 108' MD
(Insulated)
Depths are
based on
Doyon 141
RKB
Surface csg.
9 5/8" 40.0# L-80 BTC
+1- 2891' MD /2316' TVD
7" 26# L-80 BTCM
x
4 y." 12.6# L-80 IBT Mod
crossover at +1- 8915' MD I
5071' TVD
Future Perforations
Production csg
7" 26# L-80 BTCM x
4 Y:." 12.6# L-80 IBT Mod
+1- 10138' MD 15630' TVD
4 y." FMC Gen 5 Tubing Hanger, 4 y." L-80 IBT Mod pin down
4 Y:." 12.6# L-80 IBT Mod Spaceout Pups as Required
4 y." 12.6# L-80 IBT Mod Tubing to Surface
4 Y:." Cameo 'DB' nipple wI 3.875" No-Go Profile. 4 y." x 6' L-80 handling pups
installed above and below, IBT Mod, set at +1- 500' MD
4 Y:." 12.6# L-80 IBT Mod tubing to landing nipple
4 y." x 1" Cameo 'KBG-2' mandrel wI shear valve, pinned for 3000 psi shear
(casing to tubing differential), 4 y." x 6' L-80 handling pups installed above and
below, IBT Mod
4 Y:." Baker 'CMU' sliding sleeve wI 3.813" Cameo DB profile, IBT
Mod box x pin. 4 y." x 6' L-80 IBT Mod handling pup installed above
4 y." Cameo 'DB' nipple wI 3.75" No-Go profile. 4 Y:." x 12' L-80 IBT Mod
spacaeout pup installed above, 4 Y:." x 6' handling pup installed below
4 Y:." Baker 80-40 GBH-22 casing seal assembly wI 15' stroke, 4 y." L-80 IBT
Mod box up, 4 Y:." x 6' L-80 IBT Mod handling pup installed on top
Baker Seal Bore Extension, 7" BTCM x 4 y." IBT Mod
SBE set at +1- 200' MD above the top of the Bermuda interval (or 200' MD
above the Cairn if present)
OR ~ GJ ~'.Þtt~
11/25/2003
RE: Permit Application-2P-443
e
e
Sub.iect: RE: Pcrmit Application-2P-443
From: "llaydcn, Philip" <Philip.Haydcn(~.l~conocophillips.col11>
Datc: Wcd, 03 Dcc 2003 16:36:24 -0900
To: "Tom Maunder (E-mail)" <t0111_maunderØ)admin.statc.ak.us>
CC: "I layden, Philip" <Philip.JIayden~Yconocophillips.com>
Tom,
Attached are two files, one a plot indicating wells within 1320 ft of
2P-443 at the top of Cairn and the other a tabular representation of the
same. The cementing and LOT/FIT details of these two wells (2P-431 &
438) have been forwarded to you as part of the application for annular
disposal for wells 2P-422 and 2P-429 respectively.
If you need anything else please let me know.
Philip
-----Original Message-----
From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us]
Sent: Wednesday, December 03, 2003 11:41 AM
To: Hayden, Philip
Subject: Permit Application-2P-443
Hi Philip,
I am working on this application and I needed to make a request.
Since this is an injection well, one of item we look at is what is known
as an area of review.
This is a process of looking at the operational and cementing records
for the wells within 1/4 mile
of the planned wellbore. You have provided similar information for the
annular disposal applications.
Could you please provide a "1320" plot or search for the wellbores
within 1/4 mile radius of 2P-443??
It should include plug backed wellbore sections as well. Please use the
top of the Cairn as the datum.
Call with any questions.
Thanks.
Tom Maunder, PE
AOGCC
.. 2P-443 Horizontal
Content-DescriptIon: CI PI t d
earance o. oc
2P-443 Horizontal Clearance
Content-Type:
Content-Encoding:
application/msword
base64
lof2
12/9/2003 3 :29 PM
RE: Permit Application-2P-443
e
e
I.."..
Horizontal Clearance
20f2
2P-443 Horizontal
Content-Description: Clearance
Report.doc
application/msword
base64
Content- Type:
Content-Encoding:
12/9/2003 3:29 PM
ConocóP'hillips
e
Post Office Box 100360
Anchorage, Alaska 99510-0360
Randy Thomas
Phone (907) 265-6830
Email: Randy.L.Thomas@conocophillips.com
November 26, 2003
RECflVS
Þz01 D
AJaskaOiI & Gas 2003
.4nch;:C~
Alaska Oil and Gas Conservation Commission
333 West ¡th Avenue
Suite 100
Anchorage, Alaska 99501
Re: Applications for Permits to Drill, Meltwater injector, 2P-443 and producer 2P-424
~
Dear Commissioners:
ConocoPhillips Alaska, Inc. hereby applies for Permits to Drill for an onshore injection well and an
onshore production well in the Bermuda sands of the Meltwater oil pool.
Please find attached for the review of the Commission Form 10-401 and the information required by 20
ACC 25.005 for both of these wells.
The expected spud dates are as follows:
2P-424 January 2, 2003
2P-443 January 23, 2004
If you have any questions or require any further information, please contact Philip Hayden at 265-6481.
Sincerely,
~ \-~-:7
Randy Thomas
Greater Kuparuk Area Drilling Team Leader
e
e
ConocoPhillips Alaska, Inc.
Drill Site 2P
443
slot #443
Meltwater
North Slope, Alaska
H 0 R I Z 0 N TAL P LAN E C LEA RAN C ERE P 0 R T
by
Baker Hughes INTEQ
Your ref
Our ref
License
2P-443 Vers#3.a
prop4479
Date printed
Date created
Last revised
3-Dec-2003
23-Feb-2001
19-Nov-2003
Field is centred on 441964.235,5869891.466,999.00000,N
Structure is centred on 441964.235,5869891.466,999.00000,N
Slot location is n70 3 8.704,w150 27 3.668
Slot Grid coordinates are N 5868880.800, E 443640.260
Slot local coordinates are 997.96 S 1683.84 E
Projection type: alaska - Zone 4, Spheroid: Clarke - 1866
Reference North is True North
Report is limited to clearances less than 2000 feet
DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4*
- '''';:.... ·11"
LonoCot'nl IpS
e
ConoeoP
s Alaska, Inc.
Well : 443
Location : North
DEpthsc'E
RKB(DaYD"
Structure: Drill Site 2P
Field: Meltwater
2900 2800 2700 2500 25ac 2400 2300 2200 2100 2000
'-\~~
1320 ft
1 C~';~g
<- West (feet)
T~.1(Top CO~"}
e
Dot~ plotted 3-0e,,-2C03
Plol Ref€f~n~e ;s 2P-443 V"rsN3.'l
Co,,'dino1es ore in feet ,e1e'~~o~ slol 1/443
Alaska
Scale 1 inch'" 100 It
"0
4900 VI
"
~
c
c
"
(J)
o
o
'"
"
,;
I
V
&lj2Co';"9
e
-
ConocoPhillips Alaska, Inc.
Drill Site 2P,443
Meltwater,North Slope, Alaska
CLEARANCE LISTING Page 2
Your ref 2P-443 Vers#3.a
Last revised : 19-Nov-2003
Reference wellpath
Object wellpath
MWD <0 - 9685'>,,431,Drill Site 2P
--
V() ð - CJS S
M.D. T.V.D.
Rect Coordinates
M.D. T.V.D.
Rect Coordinates
Horiz Horiz MinIm
Bearing Dist Dist
61.6 1559.6 1392.2
...
9115.2 5162.0
6722.9S
1466.9W 8388.3 5162.0
5982.0S
94.5W
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level).
Total Dogleg for wellpath is 0.00 degrees.
Vertical section is from wellhead on azimuth 192.31 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
-
e
ConocoPhillips Alaska, Inc.
Drill Site 2P,443
Meltwater,North Slope, Alaska
CLEARANCE LISTING Page 1
Your ref 2P-443 Vers#3.a
Last revised : 19-Nov-2003
Reference wellpath
Object wellpath
MWD <0-9224'>,,438,Drill Site 2P
--
dO~-O)çd
Horiz Horiz MinIm
M.D. T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Dist
9115.2 5162.0 6722.98 1466.9W 7950.8 5162.0 5142.4S 1719.9W 350.9 1600.6 1071.4
All data is in feet unless otherwise stated.
Casing dimensions are not included.
Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level).
Total Dogleg for wellpath is 0.00 degrees.
Vertical section is from wellhead on azimuth 192.31 degrees.
Calculation uses the minimum curvature method.
Presented by Baker Hughes INTEQ
8.1 ppg
pressured
shallow zone
e
.
SHARON K. ALLSUP-DRAKE
CONOCOPHILLlPS
3760 PERENOSA
ANCHORAGE AK 99515
1010
,~) ~
J ./~? ~, . "~. ~
DATE V{: U?<-< ~,.! f'
II ~fi:~1
(eo.oC)
PAY TO THE
ORDER OF
~-
C CHASE Chase Manhattan Bank USA, N.A. Valid Up To 5000 Dollars
, 2DO White Cray Center Dr" Newark. DE 19111
MEMO
7P_ /if;;
t.-.'", 11 'f /'
I: 0 j . .00 . ~ ~ I: 2 . 8 ~ 7 . q 0 7 q 2 7 b II- .0 .0
e
e
TRANSMIT AL LETTER CHECKLIST
CIRCLE APPROPRJA TE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME KRU Zp,.. '1',13
2C> 3" 2-D 'I
PTD#
CHECKWBAT ADD-ONS "CLUE"
APPLIES (OPTIONS)
MULTI Tbe permit is for a new wellbore segment of
LATERAL existing well ~
Permit No, API No. .
(If API num ber Productionsbould continue to be reported as
last two (2) digits a function· of the original API number stated
are between 60-69) above.
PJLOT HOLE In accordance with 20 AAC 25.005(1), all
(PH) records, data and logs acquired for the pilot
bole must be clearly differentiated in botb
name (name on permit plus PH)
and API Dumber (50 -
70/80) from records, data and logs acquired
for well (name on permit).
SPACING Tbe permit is approved subject to full
EXCEPTION compliance witb 20 AAC 25.055. Approval to
peñorate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Companv Name) assumes tbe liability of any
protest to tbe spacing . exception tbat may
occur.
DRY DITCH An dry ditcb sample sets submitted to tbe
SAMPLE Commission must be in no greater than 30'
sample intervals from below tbe permafrost
or from wbere samples are first caught and
10' sample intervals tbrough target zones.
Rev: 07/] 0102
C\jody\templates
Field & Pool KUPARUK RIVER, MEL 1WA TER OIL - 490140 Well Name KUPARUK RIV U MELT 2P-443 Program SER Well bore seg 0
COPHILLlPS ALASKA INC Initial ClasslType SER/PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ~
-
Administration Eermit fee attached_ - - - - - - _ _ _. Yes - - - -
2 teas~ _number .apRrORriate. - - - - - - _ x~s - - - - - - - - - -- - - - - - - - - - - - - - - - - - --
3 _U_n[que weltn_arn~_aod oumb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Y~s - -- - - - - - - - - - - - - - -. - - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - ~ - -
4 WeJlJocat~d [na. d_efil]ed .pool - - - - _ _ _ _ _Y~s - - - - - - - - - - - -
5 WellJQcat~d properdistaoce from drUling ul]itb_oUl]dary_ _ _ Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
6 WellJocat~d properdislaoce_ from QtheJ wells_ _ - - - X~$ CQnseryatioo Ord_er IIIQ. A56A: _ Spaciog units ar~ J 0 acre¡¡. - - - - -- - - --
7 S_ufficiel]t _acreage_ayailable [ndJilliog unjt. - - - - - - - - - _ _ _ _ _ X~s - - - - - - - - - - - -- - - - - - - - -
8 Itd~viated, js_ weJlbQre plaUncJu.ded _ - - - -- _ X~s - - - - - - - - - - - - - - - - - . - --
9 _O-perator ol]ly- aff~cted party _ _ - - - - - - - - - - - - - . . - - _Y~$ - - - - - - -- - - - - - - - - - - - - - - - - - -
10 _O-perator bas_appropriate_bond inJQrce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _Y~s - -- - - - - - - - - - - - - - - ~ - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
11 P~rmit c_ao be issued witbQut COMerva.tion order _ _ - - - - - - - - - _ _Y~s - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Appr Date 12 P~rmitcao be issued withQut adrnil]i¡¡trati\(e_apprpvaJ _ _ - - - - - - - - - .Y~$ - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - -
SFD 12/9/2003 13 Can permit be approved before 15-day wait Yes
14 WelUQcated within area and_strataauthQrized by ojectioo Order # (put 10# incornmeots)_ (For_ Yes 8rea Injectio_n_Qrder No.. 2L - - - - - -- - - - - - - - - - - - - - - - - - - - - e
15 AJI wellsJ''lithin Jl4J'lJile_area_of reyiew jd~ot[fied (Fpr ~ervj~ wellOl]IYL _ _ _ _ _ _ _ _ _ _ _ _ _ _ y~s - -- IIIQne_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - - - - - - - - - - - - -- - - - - - - - - --
16 Pre-produ_ced iojector; duratiQn_of pre-production tess_ than. 3 mOllths. (For_service well onJy) _ _ No_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - -
17 _ACME Fïllding 9f CQn_si$teOGY has been j¡¡sued_ fOL tbis pr_oiect - - - - - - .NA WelJ drilled frQm an existing drill site> _ - - - - - - - - - -
Engineering 18 _C_oodu_ctor ¡¡trillgPJQvided . _ _ . . _ _ . - - - - - - - - - - - - - - y~s - - - - - - - - - - - -- - --
19 _S_urfa~ca~il]gpJQtect~ all_known USDW¡¡ _ . - - - - - - NA 811 aquifer¡¡ ex~mpt~d,AOCfR 102 (b)(3) _ . . _ _ _ . - - - - - - . - --
20 _CMTyotadeQuateJo circ_utateon_cond_uctoL& SUJtcsg _ . . . _ _ - - - -- Y~s - - - -- - - - - - - - - - - - - -- - - - - - - - --
21 _CMT v_ot adeQuateJo tie-inJQngstring to.surf ç¡;g_ _ _ . _ _ . _ _. No_ 8nn_utar disp9sal may be proposed. _ _ _ . _ _ _ - - - - - - - - - - - - - - - -
22 _CMTwill coyer,all known_productiye bQrizon_s_ _ _ . - - - - - . . . _Ye$ - - - - - - - -- - - - - - - - - - - - - - - -
23 C_asiog desigo~ ad_eClua_te for C,T, B _&_ p-ermafrost _ _ . _ _ . . - - - - - - - .Y~s - - - - - - - - - - - - - - - - - -
24 Adequate.tan_kage_oJ reserye pit _ _ . - - - - - - - - - - - - - - - - -- yes Rig ~Quipp_ed with ¡¡teel pits,NoJes~rve pit plal]n~d.. Waste to_an_approve_d_anouJus_or disposal_well. - - .
25 Jtare-drilL bas_a to:403 fQr abandQnment beeo aRPJQved . - - - - .NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
26 Adequatewellbore.¡¡eparatjo_n_propo¡¡ed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ - _Y~s - -- I?rp~imity- anjllysi¡¡ pertorme_d, C!ose aRPJQaçhe_sjdentjfi~d._ TraveJing c-ylinder Riot jn_ctuded> _ _ _ _ _ - - _ _ - _ _
27 Jtdjverter.required, dQes iLmeet reguJations_ _ _ _ _ _ _ _ - - - - - - - - - - - - - - .Y~s - - - - - - - - - - - - - - -- - - - - - - - - - - -- - - - - - - - --
Appr Date 28 .DJilliog fJujd_ Rrogram schematic_& e(tuip Jistadequate _ _ _ _ . . . _ _ . . _ _ _ . - - - - - Y~$ Expected BH:) in _B~rmu_da 5--1 _tQ 7.2 EMW. _ :)Ian.ned MW 9.6. _ Risk_ Qf shaJlowe.r higber preSSUJe identified> .
TEM 12/9/2003 29 _BOPEs,d_o _they meet reguJation _ _ . - - - - - - - - - - - - - -- - Y~s _ . Surface. ¡¡hpe integrity is_geoerally greater thaI] 15.Q EMWJndjc.alillg_sta_ndard well GontrQI app-lies... . e
Utt7\¡J'. \ð ~ 30 .BOPEpre_ss ra_tiog appropriate; _test to Jput p¡¡ig in _comments)_ - - - - -- _Y~s M8SF=> caIGuJate_dJor_B_ermuda H97.p_st350Q psi ap-propriate.. F=>:)CQ us_uallyJests to 50QO_p-st . . _ - .
31 Choke_manifQld cQmpJies. w/APtR:)-53 (May 84L . . . _ _ . - - - - - - . . - - Y~$ - - -- - - - - - - - - - - - - - - - - - - - - -- - - - - - - - --
32 WQrk will oGc.ur withoutoperationsbutdown_ _ . - - - - - - - - Y~s - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
33 J¡¡ Rre~eoce_ Qf H2S gas_ RroQable. _ _ _ _ _ _ _ _ - - - - - - - - - - ... _ No_ - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - --
34 MechanicaLcondJt[on p{wells withill80R yerified (For_s_ervlce welJ QnJy) _ _ _ . _ _ _ _ . _ _ . Y~s Bas~d On the TOR of _the_ CajrO,JheJe are .no wells_witbin V4 Jllile 9f 2F1-443, - - - - - - - - - - - - --
Geology 35 .P~rmit cao be tssued wlo_ hydrogen_ s.ulfide measures _ - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - -
36 _D_ata.PJesented on_ Rotential PveJRre¡¡sUœ .zone$. _ _ _ _ _ _ - - - - - - _ _ Yes WelJ will be drilled between _2P-431 and_2P:438, Qoth Qf wbich encountered_ a pre¡¡sured shaJlow lQne._Re_seryQir
Appr Date 37 S~tsmicanalysJs. of shaJlow gas_zpoes_ _ . . _ _ . _____NA may- be u.nderpœssured, BQth are discu_ssed in _DJilliog Hazards InfQrmation $ectiol] (P,3) al]d_ Qn_QriJliog
- - - --
SFD 12/9/2003 38 _S~abedcOl]diti¡:m survey (if Off-¡¡h_ore) _ _ . .NA Hazards Summary _sbeet.
- - - - - - - - - - - - -
39 _ Conta_ctnam.elphOl]eJorweelsly progre¡¡s.reports [explQratory .DOly] - - - - - - - - - NA
- -
Geologic Engineering Public gp /~
Commissioner Date: Commissioner Date Commissioner Date /0
ÞT5 2.110(3