Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-204 e e Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. dÖ3 - ~O 1+ Well History File Identifier Production Scanning Stage 1 Page Count from Scanned File: ~ (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: K YES ~ Date If/Lf/O'' Stage 1 If NO in stage 1, page(s) discrepancies were found: Organizing (done) D Two-sided /I 11111111'" 111111 RES CAN ~olor Items: D Greyscale Items: DIGITAL DATA D Diskettes, No. D Other, No/Type: D Poor Quality Originals: D Other: NOTES: BY: ~ Date 4/ t¡-!tJ 0 Dale '-1-/ '-t /óf&, I I -L x 30 = Project Proofing BY: ~ Scanning Preparation BY: Date: BY: BY: Maria Date: Scanning is complete at this point unless rescanning is required. D Rescan Needed 111111111I111111111 OVERSIZED (Scannable) D Maps: D Other Items Scannable by a Large Scanner OVERSIZED (Non-Scannable) D Logs of various kinds: D Other:: 151 IMP 11111111111111 1/11I 151 rrJ1p + -1L- = TOTAL PAGES If/ (Count does not include cover sheet) 151 p 1111111111111111111 YES NO 151 mp NO 151 1111111111/1/11111I ReScanned BY: Maria Date: 151 Comments about this file: 11111111111111 "'II Quality Checked 11/11111111I 111111I 10/6/2005 Well History File Cover Page.doc • • _ .9,,. . `~°~ ~ - MICROFILMED 03/01/2008 DO NOT PLACE *... >~' ~ '~ r- -e,; ANY NEW MATERIAL UNDER THIS PAGE F:~LaserFiche\CvrPgs_InsertslMicrofilm Marker.doc 2P-443 Permit to Drill . . Subject: 2P-443 Permit to Drill From: "Hayden, Philip" <Philip.Hayden~l~conocophillips.com> D~lte: Thu, 15 Jan 2004 12:5] :57 -0900 To: steve _ davics@]admin.statc.ak.us CC: "Jackson, Darron B." <darron.b.jackson«~'con()cophillips.com>, "Allsup-Drake, Sharon K" <Sharon. K.Allsup-DrakeCq!conocophillips.com> Steve, with reference to your telephone message of this morning ConocoPhillips would like to withdraw its permit to drill for 2P-443 as this well is being replaced by well 2P-419, whose application you are currently considering. If there are any questions please let me know. Regards Philip {). ..}~ r JZf"}.c"}~ d,) ~ ()JL( ('_(ì./n eLf! ~ "L 8{:ù<:R ~t~:J ~(ll 1 of 1 1/15/2004 3 :40 PM . ~ IK\ ~Lrù AI,ASIiA ORAND GAS CONSERVATION COMMISSION Randy Thomas Kuparuk Drilling Team Leader ConocoPhillips (Alaska), Inc. PO Box 100360 Anchorage, AK 99510-0360 . FRANK H. MURKOWSKI, GOVERNOR 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Re: Kuparuk River Field 2P-443 ConocoPhillips (Alaska), Inc. Permit No: 203-204 Surface Location: 998' FNL, 1680' FWL, Sec. 17, T8N, R7E, UM Bottomhole Location: 1950' FSL, 7" FEL, Sec. 19, T8N, R7E, UM Dear Mr. Thomas: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely '2L' BY ORDER OF THE COMMISSION DATED thisJnday of December, 2003 ee: Department ofFish & Game, Habitat Section w/o enel. Department of Environmental Conservation w/o enel. e e kt d "" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1a. Type of Work: Drill~ RedrillU 1 b. Current Well Class: ExploratoryU Development Oil U Multiple Zone 0 Re-entry 0 Stratigraphic Test 0 Service 0 Development Gas 0 Single Zone 0 2. Operator Name: 5. Bond: l{ Blanket U Single Well 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 2P-443 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 10138' TVD: 5630' Kuparuk River Field 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 998' FNL, 1680' FWL, Sec. 17, T8N, R7E, UM ADL 373112/389058 Meltwater Oil Pool Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2581' FSL, 133' FWL, Sec. 20, T8N, R7E, UM L32092 I 32409 1/23/2004 Total Depth: 9. Acres in Property: 14. Distance to 1950' FSL, 7' FEL, Sec. 19, T8N, R7E, UM 5760 Nearest Property: 2699' @ Target 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Surface: x- 443640 ' y- 5868881 -' Zone- 4 252' AMSL feet Well within Pool: 2P-441 ,40.63 16. Deviated wells: 17. Anticipated Pressure (see 20 AAC 25.035) Kickoff depth: 300 . ft. Maximum Hole Angle: 62.79° Max. Downhole Pressure: 2106 psig I Max. Surface Pressure: 1497 psig 18. Casing Program Setting Depth Quantity of Cement Size Soecifications Top Bottom c. f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 16" 62.5# H-40 Weld 80 28' 28' 108' 108' 410 sx Artie Set I (preinstalJed) 12.25" 9.625" 40# L-80 BTC 2863 28' 28' 2891 2316 546 sx ASLite & 294 sx LiteCRETE 8.5" 7" 26# L-80 BTCM 8887 28' 28' 8915 5071 352 sx LiteCRETE 8.5" 4.5" 12.6# L-80 IBTM 1223 8915 5071 10138 5630 (Included above) 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD (It): Total Depth TVD (It): Plugs (measured) Effective Depth MD (It): Effective Depth TVD (It): Junk (measured) Casing Length Size Cement Volume MD TVD Structural h ...... Conductor , \C'f :~III..·--... Detailed Operations -, VClJ Intermediate /j){;. C r. Production V J /(I/J-? Liner ,f' '. ,.. Perforation Depth MD (ft): Perforation Depth TVD (ft): Ai7i#1;;Comm¡_Jfi 20. Attachments: Filing Fee 0 BOP Sketch!:) Drilling Program~ Time v. Depth Plot 0 Shallow Hazard Analysis Q Property Plat 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Philip Hayden 265-6481 Printed Name R. Thomas Title Kuparuk Drilling Team Leader Signature ~~~ Phone é.'..6)66~o Date \l ("¿(¡{D'S p'RnR'R"¡ hv P ï n Commission Use Only Permit to Drill API Number: Permit APproval. . 0 See cover letter Number: 2D3 .. 2.L:> ¥ 50-ID.3-2ð¥7~ -ÔC Date: 19//('1 {! ? for other requirements Conditions of approval : Samples required o Yes ~~o Mud log requir{¡é! / DYes ßJ No Hydrogen sulfide measures o Yes No Directional survey required .~Yes 0 No \ Other: ~ÇOO {>":.' f'^'m.\ \f'-o.~ '" ~()\> ~~-\~ ~ \ ~ <:(l:.-Nt V\.. ~v Q \ r\"( to~. Original Signed By BY ORDER OF /2/Í{i/t1¿ Approved by: .;;. ,. _CQMMISSIONER THE COMMISSION Date: """...... r CilII' . UKltilNAL I / - . . . Form 10 401 Revised 3/2003 Submit In duplicate e .cation for Permit to Drill, Well 2P-443 . Revision No.O Saved: 25-Nov-03 Permit It - Meltwater Well #2P-443 Application for Permit to Drill Document MQximizE Well Vglu~ Table of Contents 1. Well Name .................... ........ ............ ......... ............... .................. ......... ...................... 2 Requirements of 20 AAC 25.005 (f)............... ..... ....... ....... ................. ....... ........... .......... ....... ........... .......2 2. Location Sum mary ....... ....... ............ ....... ............... .... ................ ............................... 2 Requirements of 20 AAC 25.005(c)(2) ...... ..... .................. ......... ................... ........ ................ ..................2 Requirements of 20 AAC 25.050(b )............................... ...... .......................... ...................... ................... 3 3. Blowout Prevention Equipment Information ......................................................... 3 Requirements of 20 AAC 25.005(c)(3) ......... ......... ..... ......... ........ ...... ...... ....... ..... .......... ............... ... ....... 3 4. Dri II i ng Hazards Information .......... ......... ................ ... ................... ......... ........ .... ..... 3 Requirements of 20 AAC 25.005 (c)(4) ..................................................................................................3 5. Procedure for Conducting Formation Integrity Tests ........................................... 4 Requirements of 20 AAC 25.005 (c)(5) ..................................................................................................4 6. Casi ng and Cementi ng Program ...... .... ........... ......................... .......... ..................... 4 Requirements of 20 AAC 25.005(c)(6) .... ................. ...... ........... ........ ...... ............ ...... ....... ....... ...... ......... 4 7. Diverter System Information ...................................................................................4 Requirements of 20 AAC 25.005(c)(7) ................................................................................................... 4 8. Dri II i ng FI uid Program . ......... ....... ..... ................. ................. ..... ....... ........... .............. 5 Requirements of 20 AAC 25.005(c)(B) ...................................................................................................5 Surface Hole Mud Program (extended bentonite) .................................................................................. 5 Production Hole Mud Program (LSND) .................................................................................................. 5 9. Abnormally Pressured Formation Information ......................................................5 Requirements of 20 AAC 25.005 (c)(9) .................................................................................................. 5 10. Seism ic Analysis ....... ....... .... ........... ........... ... ..... ....................... ..... ............. ............. 5 Requirements of 20 AAC 25.005 (c)(10) ................................................................................................5 11. Seabed Condition Analysis .....................................................................................6 Requirements of 20 AAC 25.005 (c)(11) ................................................................................................6 12. Evidence of Bonding ...............................................................................................6 ORIGINAL 2P-443 PERMIT IT. doc Page 10f7 Printed: 25-Nov-03 fa .ication for Permit to Drill, Well 2P-443 Revision No.O Saved: 25-Nov-03 Requirements of 20 MC 25.005 (c)(12) ................................................................................................ 6 13. Proposed Drilling Program .....................................................................................6 Requirements of 20 AAC 25.005 (c)(13) ................................................................................................6 14. Discussion of Mud and Cuttings Disposal and Annular Disposal....................... 7 Requirements of 20 AAC 25.005 (c)(14) ................................................................................................7 15. Attachments..... .................... ..... ......... ........................ ... ............ .......... ...... ............... 7 Attachment 1 Directional Plan (13 pages) ..............................................................................................7 Attachment 2 Drilling Hazards Summary (1 page) ................................................................................. 7 Attachment 3 Cement Loads and CemCADE Summary (2 page) ......................................................... 7 Attachment 4 Well Schematics (1 page) ................................................................................................7 1. Well Name Requirements of 20 AAC 25.005 (f) Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20 MC 25.040(b). For a well with multiple well branche~ each brand¡ must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. The well for which this Application is submitted will be designated as 2P-443. 2. Location Summary Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following item~ except for an Item already on file with the commission and identified in the application: (2) a plat identifying the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines. (B) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration; (C) the proposed depth of the well at the top of each objective formation and at total depth; Location at Surface I NGS Coordinates Northings: 5,868,881 Eastings: 443,640 998' FNL 1680' FWL, Section 17, T8N, R7E, UM I RKB Elevation I 252' AMSL I Pad Elevation I 224' AMSL Location at Top of Productive Interval Bermuda Sand NGS Coordinates Northings: 5,861,912 2581' FSL, 133' FWL, Section 20, T8N, R7E, UM Eastings: 442,064 9413 5298 5046 Location at Total De NGS Coordinates Northings: 5,861,283 Eastings: 441,922 1950' FSL 7' FEL Section 19 T8N R7E UM Measured De th RKB: Total Vertical De th RKB: Total Vertical De th 55: ....~ 138 5630 5378 and ORIGINAL 2P-443 PERMIT IT. doc Page 2 of 7 Printed: 25-Nov-03 e .cation for Permit to Drill, Well 2P-443 Revision No.O Saved: 25-Nov-03 (D) other information required by 20 AAC 25.0S0(b),· Requirements of 20 AAC 25.050(b) If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10-401) must (1) include a plat drawn to a suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 200 feet of any portion of the proposed well; Please see Attachment 1: Directional Plan and (2) for all wells within 200 feet of the proposed well bore (A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished a copy of the application by certified mai¿' or (8) state that the applicant is the only affected owner. The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (3) a diagram and description ofthe blowout prevention equipment (BOPE) as required by 20 AAC 25.035, 20 AAC 25.036, or 20 AAC 25.037, as applicable; An API 13 5/8" x 5,000 psi BOP stack (RSRRA) will be utilized to drill and complete well 2P-443. Please see information on the Doyon Rig 141 blowout prevention equipment placed on file with the Commission. 4. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (4) information on drilling hazards, including (A) the maximum downhole pressure that may be encountered, criteria used to determine it and maximum potential surface pressure based on a methane gradient; The expected reservoir pressures in the Bermuda sands in the 2P-443 area vary from 0.26 to 0.38 psi/ft, * or 5.1 to 7.2 ppg EMW (equivalent mud weight). These pressures are predicted based on actual bottom hole pressure data from existing wells on the field together with reservoir model forecasts. The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methane gradient (0.11) and the deepest planned vertical depth of the Bermuda sand formation is 1497 psi, calculated as follows: MPSP =(5543 ft)(0.38 - 0.11 psi/ft) =1497 psi . (B) data on potenüal gas zones; Due to the presence of high annular pressures on some of the Meltwater wells (2P-431, 451 & 438) there is the risk of encountering a pressured shallow zone. This interval may be encountered through the C-80 formation to the top of the Bermuda. The original high pressures recorded in these annuli were of concern but as can be seen from the following table a series of annular bleeds together with an observed natural decline in pressures have reduced the potential maximum pressure considerably: * Original Latest Well Surface Fluid C-80 C-80 Equivalent Surface Fluid C-80 C-80 Equivalent Pressure Level Pressure Gradient (ppg) Pressure Level Pressure Gradient (ppq) 2P-431 1600 2387 1751 13.85 1200 193 1678 13.27 2P-451 1380 2160 1541 12.23 750 1392 1020 8.10 2P-438 879 895 1245 9.83 800 768 1216 9.60 ORIGINAL 2P-443 PERMIT IT. doc Page 3 of 7 Printed: 25-Nov-03 e .·cation for Permit to Drill, We1l2P-443 Revision No.O Saved: 25-Nov-03 Using the latest annular pressures available the highest pressure that would be expected is approximately 1678 psi at 2391 ft 1VD or 13.5 ppg EMW. Most of the previously drilled Meltwater wells have had an FIT/LOT of approximately 16 ppg thus indicating that this pressured interval, should it exist, can be safely controlled with standard well control methods. and (C) data concerning potential causes of hole problems such as abnomlally geo-pressured strata, lost circulation zone!;~ and zones that have a propensity for differential sticking; Please see Attachment 2: Drilling Hazards Summary. 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC 25.005 (c)(5) An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file with the commission and identified in the application: (5) a description of the procedure for conducting formation integrity tests, as required under 20 MC 25.030(f); 2P-443 will be completed with 9 5/8" surface casing landed above the C-80 mudstone interval. The casing shoe will be drilled out and a leak off test will be performed in accordance with the "Leak Off Test Procedure" that ConocoPhillips Alaska placed on file with the Commission. 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file with the commission and identified in the application: (6) a complete proposed casing and cementing program as required by 20 AAC 25.03~ and a description of any slotted liner, pre- perforated liner, or screen to be installed; Casing and Cementing Program I See also Attachment 3: Cement Summary Hole Top Btm CsgfTbg Size Weight Length MDfTVD MDfTVO 00 (in) (in) Oblft) Grade Connection (ftJ (ft) (ft) Cement PrOQram 16 42 62.5 H-40 Welded 80 28 / 28 108 / 108 Cemented to surface with 410 sx Artic Set! 9 5/8 12 V4 40 L-80 BTC 2863 28 / 28 2891/ 2316 Cement to Surface with 546 sx AS Lite Lead, 294 sx LiteCRETE Tail 7 8 V2 26 L-80 BTCM 8887 28 / 28 8915 / 5071 Cement Top planned @ 4 V2 8 V2 12.6 L-80 IBTM 1223 8915 / 5071 10138 / 5630 8615' MD/ 4933' 1VD. Cemented w/ 352 sx LiteCRETE 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file with the commission and Identified in the application: (7) a diagram and description of the diverter system as required by 20 MC 25.035" unless this requirement is waived by the commission under 20 MC 25.035(h){2); ORIGINAL 2P-443 PERMIT IT.doc Page 4 of 7 Printed: 25-Nov-03 e .·cation for Permit to Drill, Well 2P-443 , Revision No.O Saved: 25-Nov-03 A 21 %",2000 psi annular with a 16" diameter diverter line will be the diverter system used in the drilling of 2P-443. Please see diagrams of the Doyon 141 diverter system on file with the Commission. 8. Drilling fluid Program Requirements of 20 AAC 25.005(c)(B) An applicaäon for a Permit to Drill must be accompanied by each of the following Item~ except for an item already on file with the commission and identified in the application: (8) a drilling fluid program, including a diagram and desaiption of the drilling fluid system, as required by 20 AAC 25.033/ Drilling will be done with muds having the following properties over the listed intervals: Surface Hole Mud Program (extended bentonite) Spud to Base of Permafrost Base of Permafrost to 95/8" Casin~ Point Initial Value Final Value Initial Value Final Value Density (ppg) 8.6 <9.2 <9.2* 9.6 Funnel Viscosity 250 250 150-200 55-65 (seconds) Yield Point 35-45 35-45 30-35 12-15 (eP) pH 9-9.5 9-9.5 9-9.5 9-9.5 API Filtrate 6 6 4-6 4-6 (ee /30 min)) Chlorides (mg/I) <600 <600 <600 <600 *9.6 ppg if hydrates are encountered Production Hole Mud Program (LSND) 95/8" Casin¡ Shoe to TD Initial Value Final Value Density (ppg) 9.6 9.6 Yield Point 22-28 10-15 (eP) pH 9-9.5 9-9.5 API Filtrate 4-6 4 (ee / 30 min» HTHP @ 15d' (ee)) <12 <12 Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Please see information on file with the Commission for diagrams and descriptions of the fluid system of Doyon Rig 141. 9. Abnormally Pressured formation Information Requirements of 20 AAC 25.005 (c)(9) An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on file wIth the commission and identified in the application: (9) for an exploratory or stratigraphic test wel? a tabulation setting out the depths of predicted abnormally geo-pressured strata as required by 20 AAC 25.033(f)/ Not applicable: Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) An application for a Permit to Drill must be accompanied by each of the following item~ except for an item already on tì/e with the commission and identified in the application: (10) for an exploratory or stratigraphic test wel? a seismic refraction or reflection analysis as required by 20 AAC 25.061(a)/ Not applicable: Application is not for an exploratory or stratigraphic test well. ORIGINAL 2P-443 PERMIT IT. doc Page 5 of 7 Printed: 25-Nov-03 e _cation for Permit to Drill, Well 2P-443 ., Revision No.O . Saved: 25-Nov-03 11. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on fìle with the commission and identifìed in the application: (11) for a well drilled from an offshore platform, mobile bottom-founded structure, jack-up rig, or floating drilling vessel, an analysis of seabed conditions as required by 20 MC 25.061(b); Not applicable: Application is not for an offshore well. 12. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on fìle with the commission and identified in the application: (12) evidence showing that the requirements of 20 MC 25.025 {80nding}have been met; Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program Requirements of 20 AAC 25.005 (c)(13) An application for a Permit to Drill must be accompanied by each of the following Items, except for an item already on fìle with the commission and identifìed in the application: The proposed drilling program is listed below. Please refer also to Attachment 4, Well Schematics. 1. Move in / rig up Doyon Rig 141. Install 21-1/4" Annular with 16" diverter line and function test (conductor has already been installed and cemented). 2. Spud and directionally drill 12 V4" hole to casing point at 2891' MD / 2316' TVD as per directional plan. Run MWD tools as required for directional monitoring and LWD tools as required for data acquisition. 3. Run and cement 95/8",40# L-80, BTC casing to surface. Displace cement with mud. Perform top job if required. 4. Remove diverter system and install wellhead and test. Install and test 13 5/8" x 5,000 psi BOP's and test to 5000 psi (annular preventer to 3500 psi). Notify AOGCC 24 hrs before test. 5. PU 8 V2" bit and 6 %" drilling assembly, with MWD and LWD. RIH, clean out cement to top of float equipment. Pressure test casing to 3500 psi for 30 minutes and record results. 6. Drill out cement and 20' of new hole. Perform LOT or FIT to 18.0 ppg EMW, recording results. 7. Directionally drill to 7" x 4 V2" casing point at 10138 MD /5630' TVD. 8. Run 7", 26# L-80, BTC Mod x 4 V2", 12.6# L-80, IBT Mod casing to TD. Pump cement and displace with water and mud. Note that the cross over and seal bore extension for the completion will be positioned 200' MD above the Cairn interval, if present, as this is an interval that may be produced later in the life of the field. 9. Make up completion string as required and RIH to depth. Locate seal bore extension, space out and land completion. Pressure test completion and production casing to 3500 psi for 30 minutes and record results. Shear RP shear valve in gas lift mandrel. 10. Install BPV, nipple down stack, nipple up and test tree to 5,000 psi. Pull BPV 11. Freeze protect well with diesel by pumping into the annulus, taking returns from tubing and allowing to equalize. Carry out LOT and injection test on the outer annulus. Sweep the annulus with water and freeze protect. 12. Set BPV and move rig off. 13. Rig up wire line unit. Pull BPV. Set dummy valve in place of RP shear valve in gas lift mandrel. Perform MIT pressure tests of tubing and annulus (Tubing and annulus to 3500 psi). 14. Run cement bond log and perforate. Rig down wire line unit. ORIGINAL 2P-443 PERMIT IT. doc Page 6 of 7 Printed: 25-Nov-03 e .·cation for Permit to Drill, Well 2P-443 Revision No.O Saved: 25-Nov-03 15. Freeze protect well and turn well over to production. 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) An application for a Permit to Drill mustc be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (14) a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 MC 25.080 for an annular disposal operation in the well.; Waste fluids generated during the drilling process will be disposed of either by pumping authorized fluids into a permitted annulus on 2P Pad, or by hauling the fluids to a KRU Class II disposal well. All cuttings generated will be disposed of either down a permitted annulus on 2P Pad, hauled to the Prudhoe Bay Grind and Inject Facility for temporary storage and eventual processing for injection down an approved disposal well, or stored, tested for hazardous substances, and used on the pad in accordance with a permit from the State of Alaska. At the end of drilling operations, an application may be submitted to permit 2P-443 for annular disposal of fluids occurring as a result of future drilling operations on 2P pad. 15. Attachments Attachment 1 Directional Plan (13 pages) Attachment 2 Drilling Hazards Summary (1 page) Attachment 3 Cement Loads and CemCADE Summary (2 page) Attachment 4 Well Schematics (1 page) ORIGINAL 2P-443 PERMIT IT. doc Page 70'7 Printed: 25-Nov-03 Cre<;Jted by bmrchaer Dote plotted: 19-Nov-2003 Plot Refersnce- Is 2P-443 VflrfSI3.o. Coordinates ore in feet re-ference slot 1443. True Vertical Depths ore referetlce: RICB (Doyon 141). ..;: INTEQ e e ConocoPhillips Alaska, Inc. Structure: Drill Site 2P Well: 443 Field: Meltwater Location : North Slope. Alaska <- West (feet) 4000 3600 3200 2800 2400 2000 1600 1200 800 SURFACE LOCATION: 998' FNL. 1680' FWL SEC. 17, T8N, R7E Base Permafrost .**Plane of Proposal*** 192.31 AZIMUTH 7146' (TO TARGET) 4 TRUE TARGET LOCATION: 2581' FSL, 133" FWL SEC. 20, T8N, R7E ~ ConocoPhillips 400 .L- Target-Top Bermuda(T3) 2P-443 Top Berm Tgt 22 Jul 03 Base West Sak 800 EOC ''';"/' 1200 9 5/8 CBO 1600 I 2000 2400 2800 3200 VJ 0 c -- 3600 ::r ~ --+. CD 4000 CD -- '--" I 4400 V 4800 5200 5600 6000 6400 TO LOCATION: 1950' FSL, 7' FEL SEC. 19, T8N, R7E ORIGINAL o 400 400 KOP o 400 6800 7200 7600 8000 0 400 800 1200 1600 '"""' ...... 0 Q) Q) 2000 ...... :::0 '-../ ....c - ...... 2400 a.. (j) Q) 0 - Z 0 2800 Ü » += I... Q) 3200 r- > Q) :J 3600 I... l- I V 4000 4400 -i 4800 5200 5600 6000 RKB Elevation: 252' KOP 2.00 4.00 6.00 OlS: 2.00 deg per 100 It 6.00 Build 3/100 13.00 16.00 19.00 DlS: 3.00 deg per 100 ft 22.00 25.00 28.00 Base Permafrost 31.00 34.00 40.00 46.00 Bose West Sok 52.00 58.00 EOC -2; 9 5/8 83ßing o 400 800 1200 I I ConocoPhillips Alaska, Inc. ~ ConocoPhillips Structure : Drill SIte 2P Field : Meltwater Well : 443 Location : North Slope, Alaska Created by bmichoel Dote plotted: 20-Nov-2003 Plol Reference is 2P-443 Vers#3.a. Coordinates ore in feet reference !!!Iot #443. True Vertical Depths ore reference RKB (Doyon _ ..11.1. .,.. INTEQ 192.31 AZIMUTH 7146' (TO TARGET) e ***Plone of Proposol*** C50 C37 e T7 -~ 7 X 4 1/2 XO T4.1 (Top Cairn) Target-Tap Bermuda(T3) 2P-443 Tap Berm Tgt 22 Jul 03 T2(Base Bermuda) C35(Top Albian) TD - Ccsing pt. 1600 2000 2400 2800 3200 3600 4000 4400 4800 5200 5600 6000 6400 6800 7200 7600 8000 Vertical Section (feet) -> Azimuth 192.31 with reference 0.00 N, 0.00 E from slot #443 Created by bm1cnoel Dote ploUed : 20-Nav-2003 Plol Reference is 2P-443 VersI/3.a. Coordinates ore in feet reference slot '443. hrue Vertical Depths ore reference RKB (Doyon 141). I ..: INTEQ ConocoPhillips Alaska, Inc. Structure : Drill Site 2P Well : 443 Field : Meltwater Location : North Slope, Alaska ........ ConocoPhillips ==== PROF~LE COMMENT DATA ----- Point ----- MD 300.00 800.00 1388.19 2169.75 2559.62 2891.35 3055.36 4328.12 5001.67 o :::0 - GJ - Z » r- KOP Build 3/100 Base Permafrost Base West Sak EOC 9 5/8 Casing C80 C50 C40 C37 5353.75 ì7 7300.06 7 x 4 1/2 XO 8915.15 T4.1(Top Cairn) 9115.15 Target-Top Bermuda(T 1#..V 9412.57 T2(Base Bermuda) 9948.35 C35(Top Albian) 10042.38 TD - Casino Pt. . 10138.35 Inc 0.00 10.00 27.65 51.09 62.79 62.79 62.79 62.79 62.79 62.79 62.79 62.79 62.79 62.79 62.79 62.79 62.79 Dir 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192..31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 TVD 300.00 North 0.00 797.47 -42.52 1352.00 -227.20 1952.00 - 708.19 2164.31 -1026.87 2316.00 -1315.11 2391.00 -1457.62 2973.00 -2563.49 3281.00 -3148.73 .3442.00 -3454.65 4332.00 -5145.76 5070.54 -6549.08 5162.00 -6722.86 5298.00 -6981.28 5543.00 -7446.81 5586.00 -7528.52 5629.88 -7611.90 East 0.00 -9.28 -49.58 -154.53 -224.06 -286.95 -318.04 -559.33 -687.03 - 753. 78 -1122.76 -1428.95 -1466.87 -1523.25 -1624.83 -1642.66 -1660.85 ==== e V. Sect 0.00 43.52 232.55 724.85 1051.03 1346.05 1491.91 2623.80 3222.81 3535.93 5266.83 6703.16 6881.03 7145.53 7622.01 7705.64 7790.99 Deg/100 0.00 2.00 3.00 3.00 3.00 0.001 0.00 0.00 0.00 e 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 onocoP Al .y,~ ConocQPhimps Crooted by bmí-choe! Date plotted ~ 20~Nov-2003 Plot R~f~fence ís 2P--443 V$'Si3~a. $!01 #44-3_ (Doyon Structure: Drill Site 2P Field : Meltwater TRUE NORTH 240 ~ 340 30 320 40 , T 1100 60 ~,.~ 290 70 80 270 90 260 100 250 110 120 230 130 220 140 210 1 0 200 160 190 180 170 Normal Plane Travelling Cylinder - Fe All depths shown ore Measured depths on R rence Well <- West (feet) 520 480 440 400 360 320 280 240 200 160 120 80 40 U 40 80 120 Q?q'o,,1100 40 000 900 700 0 300 40 j 900 1000 ! 80 11 120 100 ! l 300 1200f 160 ! / I ! .1300 . 1400 1300,! 200 / ! ! 1500 ! 240 1400f (f) ! 0 ! 280 C 500 I -+ 1600 :::J 15001 ~ ! 320 - / ! ill / ill 600 ! -+ '---" 700 ! / 16001 I / V / I I ! 400 700 ! ¡ 1800 I I ! 440 17001 ! ! 480 ¿1800 ! ¿1900 ! ! 520 ! I 1800 ¿ I ! 560 / ! 1900 / I ! / 2000 ! 600 ! @ / ! / ! 640 1900 + / ! (!; 680 Con Ala (;rooted by bmkhael Date pJotte:d 20-Nov....,2003 Plot ReferjJ!l1cl'i' is 2P""'44~ V~tJ3/J, Coor.qincitss Off : ÍfI 1ßßt fafe.-sncBs!ot 1443" Loccltion Structure: Drill Site 2P Field : Meltwat<;,r rue VertÎcal (Ooyoo '9'", ConocoPhimps by bm!ct¡o.ef D<1te pl"i;teci ; 20~Nov~2003 Plot ReferencE! ís 2P.,.,,443 Vers#3.<J. 1100 1000 900 I I I I I @ ¡J (!; 800 / 2300 Structure: Drill Site 2P onocoPhilli ps field : Meltwater <- West (feet) 700 600 Canoe nips / I I I / / / /2300 ¡ ¡ ¡ ¡ 2300 ¡ / 2700 600 500 600 700 800 900 1000 1100 1200 1300 (f) 0 1400 ,,--.,., - (!) 1500 (!) -i- '-.../ I 1600 V 1700 1800 1900 2000 2100 2200 2300 2400 1900 Oat¢ plotted: 20~Nö\f- 2003 Plot Reference í-s 2P-A43 Ven>lf3,t:J, Coordìr;ales ora in fßat r1ô:fanmcEi slQt 1443. Vertical Depth5 RKI3(Ooyon INTEQ onocQPhilli pS Structure: Drill 2P Field : Meltwater Well : Location : North Alaska ø <- West 3000 2700 2400 2100 1800 i 4500 @ I i 4200 5100 5400 5700 / ¡ 5400 / 1> / / I / 3900 / '3600 ø ! ! . 4500 I ! 00 4200 4500 4800 5100 5400 5700 @ 3:500 3600 5900 y ConocoPhmips 300 600 2100 3000 2400 2700 3000 3300 3600 3900 4200 4500 (f) 4800 0 5100 ".-., -+. (f) (f) - 5400 '-" I V 5700 6000 6300 6600 6900 - 7200 7500 7800 8100 ;'700 e e ConocoPhillips Alaska, Inc. Drill Site 2P 443 slot #443 Meltwater North Slope, Alaska PRO P 0 S ALL I S TIN G by Baker Hughes INTEQ Your ref Our ref License 2P-443 Vers#3.a prop4479 Date printed Date created Last revised 5-Sep-2003 23-Feb-2001 5-Sep-2003 Field is centred on 441964.235,5869891.466,999.00000,N Structure is centred on 441964.235,5869891.466,999.00000,N Slot location is n70 3 8.704,w150 27 3.668 Slot Grid coordinates are N 5868880.800, E 443640.260 Slot local coordinates are 997.96 S 1683.84 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ORIGINAL e ConocoPhillips Alaska, Inc. Drill Site 2P,443 Meltwater,North Slope, Alaska Measured Inclin. Azimuth True Vert Depth Degrees Degrees Depth 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 4.00 6.00 8.00 10.00 13 .00 1000.00 1100.00 1200.00 1300.00 1388.19 16.00 19.00 22.00 25.00 27.65 1400.00 1500.00 1600.00 1700.00 1800.00 28.00 31. 00 34.00 37.00 40.00 1900.00 2000.00 2100.00 2169.75 2200.00 43.00 46.00 49.00 51. 09 52.00 2300.00 2400.00 2500.00 2559.62 2891.35 55.00 58.00 61. 00 62.79 62.79 3000.00 3055.36 3500.00 4000.00 4328.12 62.79 62.79 62.79 62.79 62.79 4500.00 5000.00 5001.67 5353.75 5500.00 62.79 62.79 62.79 62.79 62.79 6000.00 6500.00 7000.00 7300.06 7500.00 62.79 62.79 62.79 62.79 62.79 8000.00 8500.00 8915.15 9000.00 9115.15 62.79 62.79 62.79 62.79 62.79 0.00 0.00 0.00 0.00 2.00 0.00 192.31 192.31 192.31 192.31 0.00 100.00 200.00 300.00 399.98 499.84 599.45 698.70 797.47 895.45 992.25 1087.61 1181. 27 1272.96 1352.00 1362.45 1449.47 1533.80 1615.20 1693.46 1768.34 1839.66 1907.21 1952.00 1970.81 2030.29 2085.47 2136.22 2164.31 2316.00 2365.68 2391. 00 2594.32 2822.96 2973.00 3051. 60 3280.24 3281. 00 3442.00 3508.88 3737.51 3966.15 4194.79 4332.00 4423.43 4652.07 4880.70 5070.54 5109.34 5162.00 R E C TAN G U L A R COO R DIN ATE S 0.00 N 0.00 N 0.00 N 0.00 N l.71S 6.82 S 15.33 S 27.24 S 42.52 S 62.00 S 86.46 S 115.83 S 150.05 S 189.00 S 227.20 S 232.59 S 280.69 S 333.18 S 389.91 S 450.72 S 515.46 S 583.93 S 655.95 S 708.19 S 731. 33 S 809.86 S 891. 32 S 975.50 S 1026.87 S 1315.11 S 1409.51 S 1457.62 S 1843.96 S 2278.40 S 2563.49 S 2712.84 S 3147.28 S 3148.73 S 3454.65 S 3581.72 S 4016.16 S 4450.60 S 4885.04 S 5145.76 S 5319.49 S 5753.93 S 6188.37 S 6549.08 S 6622.81 S 6722.86 S 0.00 E 0.00 E 0.00 E 0.00 E 0.37 W 1. 49 W 3.35 W 5.94 W 9.28 W 13 . 53 W 18.87 W 25.28 W 32.74 W 41. 24 W 49.58 W 50.75 W 61. 25 W 72.70 W 85.08 W 98.35 W 112.47 W 127.41 W 143.13 W 154.53 W 159.58 W 176.71 W 194.48 W 212.85 W 224.06 W 286.95 W 307.55 W 318.04 W 402.34 W 497.13 W 559.33 W 591. 92 W 686.71 W 687.03 W 753.78 W 781. 50 W 876.29 W 971. 08 W 1065.88 W 1122.76 W 1160.67 W 1255.46 W 1350.25 W 1428.95 W 1445.04 W 1466.87 W Dogleg Deg/100ft e PROPOSAL LISTING Page 1 Your ref 2P-443 Vers#3.a Last revised 5-Sep-2003 Vert Sect 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 0.00 KOP 1. 75 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 192.31 2.00 2.00 2.00 2.00 3.00 6.98 15.69 27.88 43.52 63.46 3.00 3.00 3.00 3.00 3.00 88.49 118.56 153.58 193.45 232.55 Base Permafrost 3.00 3.00 3.00 3.00 3.00 238.06 287.30 341.02 399.09 461.33 3.00 3.00 3.00 3.00 3.00 527.58 597.67 671 .39 724.85 Base West Sak 748.54 3.00 3.00 3.00 3.00 0.00 828.92 912.30 998.45 1051. 03 EOC 1346.05 9 5/8" Casing 0.00 0.00 0.00 0.00 0.00 1442.68 1491.91 C80 1887.34 2332.00 2623.80 C50 0.00 0.00 0.00 0.00 0.00 2776.66 3221. 33 3222.81 C40 3535.93 C37 3665.99 0.00 0.00 0.00 0.00 0.00 4110.65 4555.31 4999.98 5266.83 T7 5444.64 0.00 0.00 0.00 0.00 0.00 5889.30 6333.96 6703.16 7 x 4 1/2 XO 6778.62 6881.03 T4.1(Top Cairn} All data is in feet unless otherwise stated. Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level). Bottom hole distance is 7790.99 on azimuth 192.31 degrees from wellhead. Total Dogleg for wellpath is 62.79 degrees. Vertical section is from wellhead on azimuth 192.31 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ORIGINAL e e ConocoPhillips Alaska, Inc. PROPOSAL LISTING Page 2 Drill Site 2P,443 Your ref 2P-443 Vers#3.a Meltwater,North Slope, Alaska Last revised 5-Sep-2003 Measured Inclin. Azimuth True Vert R E C TANGU L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 RDINA T E S Deg/lOOft Sect 9412.57 62.79 192.31 5298.00 6981. 2 8 S 1523.25 W 0.00 7145.53 2P-443 Top Berm Tgt 22 Jul 03 9500.00 62.79 192.31 5337.98 7057.25 S 1539.83 W 0.00 7223.29 9948.35 62.79 192.31 5543.00 7446.81 S 1624.83 W 0.00 7622.01 T2(Base Bermuda) 10000.00 62.79 192.31 5566.62 7491.69 S 1634.62 W 0.00 7667.95 10042.38 62.79 192.31 5586.00 7528.52 S 1642.66 W 0.00 7705.64 C35(Top Albian) 10138.35 62.79 192.31 5629.88 7611. 90 S 1660.85 W 0.00 7790.99 TD - Casing Pt. All data is in feet unless otherwise stated. Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level). Bottom hole distance is 7790.99 on azimuth 192.31 degrees from wellhead. Total Dogleg for wellpath is 62.79 degrees. Vertical section is from wellhead on azimuth 192.31 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ ORIGINAL e e ConocoPhillips Alaska, Inc. Drill Site 2P,443 Meltwater,North Slope, Alaska PROPOSAL LISTING Page 3 Your ref 2P-443 Vers#3.a Last revised: 5-Sep-2003 Comments in wellpath -------------------- -------------------- MD TVD Rectangular Coords. Comment ----------------------------------------------------------------------------------------------------------- 300.00 300.00 0.00 N 0.00 E KOP 1388.19 1352.00 227.20 S 49.58 W Base Permafrost 2169.75 1952.00 708.19 S 154.53 W Base West Sak 2559.62 2164.31 1026.87 S 224.06 W EOC 2891. 35 2316.00 1315.11 S 286.95 W 9 5/8" Casing 3055.36 2391.00 1457.62 S 318.04 W C80 4328.12 2973.00 2563.49 S 559.33 W C50 5001.67 3281. 00 3148.73 S 687.03 W C40 5353.75 3442.00 3454.65 S 753.78 W C37 7300.06 4332.00 5145.76 8 1122.76 W T7 8915.15 5070.54 6549.08 8 1428.95 W 7 x 4 1/2 XO 9115.15 5162.00 6722.86 8 1466.87 W T4.1(Top Cairn) 9412.57 5298.00 6981. 28 8 1523.25 W 2P-443 Top Berm Tgt 22 Jul 03 9948.35 5543.00 7446.81 8 1624.83 W T2(Base Bermuda) 10042.38 5586.00 7528.52 8 1642.66 W C35(Top Albian) 10138.35 5629.88 7611.90 8 1660.85 W TD - Casing Pt. Targets associated with this wellpath ------------------------------------- ------------------------------------- Target name Geographic Location T.V.D. Rectangular Coordinates Revised ----------------------------------------------------------------------------------------------------------- 2P-443 Top Berm Tgt 442064.000,5861912.000,999.00 5298.00 6981. 288 1523.25W 22-Feb-2001 ORIGINAL e e ConocoPhillips Alaska, Inc. Drill Site 2P 443 slot #443 Meltwater North Slope, Alaska PRO P 0 S ALL 1ST I N G by Baker Hughes INTEQ Your ref Our ref License 2P-443 Vers:ft3.a prop4479 Date printed Date created Last revised 19-Nov-2003 23-Feb-200l 19-Nov-2003 Field is centred on 441964.235,5869891. 466.999.00000. N Structure is centred on 44l964.235,586989l.466,999.00000.N Slot location is n70 3 8.704.w150 27 3.668 Slot Grid coordinates are N 5868880.800, E 443640.260 Slot local coordinates are 997.96 S 1683.84 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North ORIGINAL e e ConocoPhillips Alaska, Inc. PROP08AL LI8TING Page 1 Drill Site 2P,443 Your ref 2P-443 Vers#3.a Meltwater,North Slope, Alaska Last revised : 19-Nov-2003 Measured Inclin Azimuth True Vert R E C TAN GULAR G RID C o 0 R D 8 G E 0 G RAP HIe Depth Degrees Degrees Depth C 0 0 R DIN ATE 8 Easting Northing C 0 0 R DIN ATE 8 0.00 0.00 0.00 0.00 O.OON O.OOE 443640.26 5868880.80 n70 3 08.70 w150 27 03.67 100.00 0.00 192.31 100.00 O.OON O.OOE 443640.26 5868880.80 n70 3 08.70 w150 27 03.67 200.00 0.00 192.31 200.00 O.OON O.OOE 443640.26 5868880.80 n70 3 08.70 w150 27 03.67 300.00 0.00 192 .31 300.00 O.OON O.OOE 443640.26 5868880.80 n70 3 08.70 w150 27 03.67 400.00 2.00 192.31 399.98 1. 718 0.37W 443639.87 5868879.10 n70 3 08.69 w150 27 03.68 500.00 4.00 192.31 499.84 6.828 1.49W 443638.72 5868873.99 n70 08.64 w150 27 03.71 600.00 6.00 192.31 599.45 15.338 3.35W 443636.80 5868865.49 n70 08.55 w150 27 03.76 700.00 8.00 192.31 698.70 27.248 5.94W 443634.11 5868853.61 n70 08.44 w150 27 03.84 800.00 10.00 192.31 797 .47 42.528 9.28W 443630.66 5868838.35 n70 08.29 w150 27 03.94 900.00 13 .00 192.31 895.45 62.008 13 .53W 443626.26 5868818.91 n70 08.09 w150 27 04.06 1000.00 16.00 192.31 992.25 86.468 18.87W 443620.74 5868794.50 n70 3 07.85 w150 27 04.21 1100.00 19.00 192.31 1087.61 115.838 25.28W 443614 .10 5868765.17 n70 3 07.56 w150 27 04.40 1200.00 22.00 192.31 1181. 27 150.058 32.74W 443606.38 5868731. 02 n70 3 07.23 w150 27 04.61 1300.00 25.00 192.31 1272.96 189.008 41.24W 443597.58 5868692.14 n70 3 06.84 w150 27 04.86 1388.19 27.65 192.31 1352.00 227.208 49.58W 443588.96 5868654.00 n70 3 06.47 w150 27 05.10 1400.00 28.00 192 .31 1362.45 232.598 50.75W 443587.74 5868648.63 n70 06.42 w150 27 05.13 1500.00 31. 00 192.31 1449.47 280.698 61. 25W 443576.88 5868600.61 n70 05.94 w150 27 05.43 1600.00 34.00 192.31 1533.80 333.188 72.70W 443565.03 5868548.21 n70 05.43 w150 27 05.76 1700.00 37.00 192.31 1615.20 389.918 85.08W 443552.22 5868491.59 n70 04.87 w150 27 06.12 1800.00 40.00 192.31 1693.46 450.728 98.35W 443538.49 5868430.88 n70 04.27 w150 27 06.50 1900.00 43.00 192.31 1768.34 515.468 112.47W 443523.87 5868366.27 n70 03.63 w150 27 06.91 2000.00 46.00 192.31 1839.66 583.938 127.41W 443508.41 5868297.92 n70 02.96 w150 27 07.34 2100.00 49.00 192.31 1907.21 655.958 143 .13W 443492.15 5868226.02 n70 02.25 w150 27 07.79 2169.75 51.09 192.31 1952.00 708.198 154.53W 443480.36 5868173.88 n70 01. 74 w150 27 08.12 2200.00 52.00 192.31 1970.81 731.338 159.58W 443475.13 5868150.77 n70 01.51 w150 27 08.27 2300.00 55.00 192.31 2030.29 809.868 176.71W 443457.40 5868072.39 n70 3 00.74 w150 27 08.76 2400.00 58.00 192.31 2085.47 891. 328 194.48W 443439.01 5867991. 07 n70 2 59.94 w150 27 09.27 2500.00 61. 00 192.31 2136.22 975.508 212.85W 443420.00 5867907.05 n70 2 59.11 w150 27 09.80 2559.62 62.79 192.31 2164.31 1026.878 224.06W 443408.40 5867855.76 n70 2 58.60 w150 27 10.13 2891.35 62.79 192.31 2316.00 1315.118 286.95W 443343.32 5867568.04 n70 2 55.77 w150 27 11. 94 3000.00 62.79 192 .31 2365.68 1409.518 307.55W 443322.01 5867473.81 n70 54.84 w150 27 12.53 3055.36 62.79 192.31 2391. 00 1457.628 318.04W 443311.15 5867425.79 n70 54.37 w150 27 12.84 3500.00 62.79 192 .31 2594.32 1843.968 402.34W 443223.92 5867040.14 n70 50.57 w150 27 15.27 4000.00 62.79 192.31 2822.96 2278.408 497.13W 443125.83 5866606.48 n70 46.30 w150 27 18.00 4328.12 62.79 192.31 2973.00 2563.498 559.33W 443061. 46 5866321.89 n70 43.49 w150 27 19.79 4500.00 62.79 192.31 3051. 60 2712.848 591. 92W 443027.74 5866172.81 n70 2 42.02 w150 27 20.73 5000.00 62.79 192.31 3280.24 3147.288 686.71W 442929.65 5865739.15 n70 2 37.75 w150 27 23.46 5001.67 62.79 192.31 3281. 00 3148.738 687.03W 442929.32 5865737.70 n70 2 37.74 w150 27 23.47 5353.75 62.79 192.31 3442.00 3454.658 753.78W 442860.25 5865432.33 n70 2 34.73 w150 27 25.39 5500.00 62.79 192.31 3508.88 3581. 728 781. 50W 442831. 56 5865305.48 n70 2 33.48 w150 27 26.19 6000.00 62.79 192.31 3737.51 4016.168 876.29W 442733.47 5864871.82 n70 2 29.21 w150 27 28.92 6500.00 62.79 192.31 3966.15 4450.608 971.08W 442635.38 5864438.15 n70 2 24.93 w150 27 31. 65 7000.00 62.79 192 .31 4194.79 4885.048 1065.88W 442537.29 5864004.49 n70 2 20.66 w150 27 34.38 7300.06 62.79 192.31 4332.00 5145.768 1122.76W 442478.43 5863744.24 n70 2 18.10 w150 27 36.02 7500.00 62.79 192.31 4423.43 5319.498 1160.67W 442439.21 5863570.82 n70 2 16.39 w150 27 37.11 8000.00 62.79 192.31 4652.07 5753.938 1255.46W 442341.12 5863137.16 n70 2 12.11 w150 27 39.84 8500.00 62.79 192.31 4880.70 6188.378 1350.25W 442243.03 5862703.50 n70 2 07.84 w150 27 42.57 8915.15 62.79 192 .31 5070.54 6549.08S 1428.95W 442161. 58 5862343.42 n70 2 04.29 w150 27 44.84 9000.00 62.79 192.31 5109.34 6622.818 1445.04W 442144.94 5862269.83 n70 2 03.57 w150 27 45.30 9115.15 62.79 192.31 5162.00 6722.868 1466.87W 442122.35 5862169.96 n70 2 02.58 w150 27 45.93 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level). Bottom hole distance is 7790.99 on azimuth 192.31 degrees from wellhead. Total Dogleg for wellpath is 62.79 degrees. Vertical section is from wellhead on azimuth 192.31 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ORIGINAL e e ConocoPhillips Alaska, Inc. PROPOSAL LISTING Page 2 Drill Site 2P,443 Your ref 2P-443 Vers#3. a Mel twater I North Slope, Alaska Last revised : 19-Nov-2003 Measured Inclin Azimuth True Vert R E CTANGULAR G RID COO R D S G E 0 G RAP H I C Depth Degrees Degrees Depth C 0 o R DIN ATE S Easting Northing C 0 0 R DINATE S 9412.57 62.79 192.31 5298.00 6981.28S 1523.25W 442064.00 5861912.00 n70 2 00.04 w150 27 47.55 9500.00 62.79 192 . 31 5337.98 7057.25S 1539.83W 442046.85 5861836.17 n70 1 59.30 w150 27 48.03 9948.35 62.79 192.31 5543.00 7446.81S 1624.83W 441958.89 5861447.30 n70 1 55.46 w150 27 50.47 10000.00 62.79 192.31 5566.62 7491.69S 1634.62W 441948.76 5861402.50 n70 1 55.02 w150 27 50.76 10042.38 62.79 192.31 5586.00 7528.52S 1642.66W 441940.44 5861365.74 n70 1 54.66 w150 27 50.99 10138.35 62.79 192.31 5629.88 7611.90S 1660.85W 441921.62 5861282.51 n70 1 53.84 w150 27 51. 51 All data in feet unless otherwise stated. Calculation uses minimum curvature method. Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level). Bottom hole distance is 7790.99 on azimuth 192.31 degrees from wellhead. Total Dogleg for wellpath is 62.79 degrees. Vertical section is from wellhead on azimuth 192.31 degrees. Grid is alaska - Zone 4. Grid coordinates in FEET and computed using the Clarke - 1866 spheroid Presented by Baker Hughes INTEQ ORIGINAL e ConocoPhillips Alaska, Inc. Drill 5ite 2P,443 Meltwater,North Slope, Alaska MD TVD - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -- - - - - - - - --- ---- 300.00 800.00 1388.19 2169.75 2559.62 2891.35 3055.36 4328.12 5001.67 5353.75 7300.06 8915.15 9115.15 9412.57 9948.35 10042.38 10138.35 300.00 797.47 1352.00 1952.00 2164.31 2316.00 2391.00 2973.00 3281.00 3442.00 4332.00 5070.54 5162.00 5298.00 5543.00 5586.00 5629.88 Top MD Top TVD e PROP05AL LI5TING Page 3 Your ref 2P-443 Vers#3.a Last revised : 19-Nov-2003 Comments in wellpath -------------------- -------------------- Rectangular Coords. O.OON 42.525 227.205 708.195 1026.875 1315.115 1457.625 2563.495 3148.735 3454.655 5145.765 6549.085 6722.865 6981. 285 7446.815 7528.525 7611. 905 Comment O.OOE KOP 9.28W Build 3/100 49.5SW Base Permafrost 154.53W Base West Sak 224.06W EOC 286.95W 9 5/8" Casing 318.04W C80 559.33W C50 687.03W C40 753.78W C37 1122.76W T7 1428.95W 7 x 4 1/2 XO 1466.87W T4.1(Top Cairn} 1523.25W 2P-443 Top Berm Tgt 22 Ju1 03 1624.83W T2 (Base Bermuda) 1642.66W C35(Top Albian} 1660.85W TD - Casing Pt. Casing positions in string 'A' ------------------------------ ------------------------------ 0.00 O.OON Rectangular Coords. 1315.115 Bot MD Bot TVD Rectangular Coords. Casing 0.00 - - - -- - - - - - - - - - - - - - - - -- - - - - -- - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -- - - - - - -- 286.95W 9 5/8' Casing Target name O.OOE 2891.35 2316.00 Targets associated with this wellpath ------------------------------------- ------------------------------------- Geographic Location 6981.285 Rectangular Coordinates 1523.25W 22-Feb-2001 T.V.D. Revised - - -- - - - -- - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - -- - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - -- - - - - -- 2P-443 Top Berm Tgt 442064.000,5861912.000,999.00 5298.00 ORIGINAL taker Hughes Incorporat. Anticollision Report --. Cum pan)': Field: Reference Sile: Reference Well: Reference Wellpalh: ConocoPhillips Alaska, Inc. Meltwater 2P Pad 443 2P-443 Vers#3a Dal ;': 11/20/2003 Time: 14:00:25 I'al:e: I Co-ordinate(:'IiE) I{eference: Well: 443, True North \'erlkal (T\'D) Reference: Doyon 141 (old2) 252.0 Db: Oracle . _. on.. .n.. .... ...... ..-... -.---.-..--.--.-- ..... ..--- ----...... .. . -.---.-. .. _______n_.. --,- ---.--.-.---.. -.---- __.. . n_... -.... ..-.. . NO GLOBAL SCAN: Using user defined setection & scan criteria Interpotation Method: MD Interval: 25.00 ft Depth Range: 0.00 to 10138.35 ft Maximum Radius: 5280.00 ft Reference: Error Model: Scan Method: Error Surface: Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Survey Program for Definitive Wellpath Date: 9/27/2002 Validated: No ptanned From To Survey ft ft 0.00 10138.35 Planned: 2P-443 Vers#3a V5 Version: 1 Toolcode Tool Name MWD+SAG MWD + Sag correction Casing Points MD TVD.·· Diameter Hole Size ...Name ft ft in in ------ 2891.35 2316.00 9.625 12.250 95/8" 10138.35 5629.89 7.000 8.500 7" :>..;"'_.. ¡'f' Summary <----------:-~()ffset Wellpath --,--..,...::¥->':f .' '..>' . ,,,,,,>,. . ...>" Reference . Offset Ctr-Ctr No-Go Allowahle Site .. Well Wellpil.th :;"". 1\1D MD Distance Area Deviation Warning . ft. . ·It ft ft ft -- 2P Pad 406 2P-406 Vers#2.A V2 Pia 389.88 400.00 740.70 8.00 732.70 Pass: Major Risk 2P Pad 414 2P-414 Vers#3a V1 Plan 391.89 400.00 580.56 8.03 572.53 Pass: Major Risk 2P Pad 415 2P-415 VO 299.95 300.00 560.32 5.81 554.51 Pass: Major Risk 2P Pad 415 2P-415A VO 299.95 300.00 560.32 5.81 554.51 Pass: Major Risk 2P Pad 416 2P-416 Version#O.A VO 392.41 400.00 540.47 8.04 532.43 Pass: Major Risk 2P Pad 417 2P-417 VO 346.24 350.00 522.27 7.00 515.27 Pass: Major Risk 2P Pad 419 2P-419Vers#3.A V1 Pia 323.31 325.00 480.38 6.54 473.84 Pass: Major Risk 2P Pad 420 2P-420 VO 370.06 375.00 461.23 6.96 454.27 Pass: Major Risk 2P Pad 422 2P-422 V7 347.01 350.00 419.90 6.53 413.37 Pass: Major Risk 2P Pad 422 422A VO 347.01 350.00 419.90 6.53 413.37 Pass: Major Risk 2P Pad 424 2P-424 Vers#3.b V1 Pia 347.27 350.00 380.25 7.09 373.16 Pass: Major Risk 2P Pad 427 2P-427 VO 395.35 400.00 320.89 7.29 313.60 Pass: Major Risk 2P Pad 429 2P-429 VO 323.97 325.00 281.36 6.48 274.88 Pass: Major Risk 2P Pad 431 2P-431 V1 396.44 400.00 238.64 7.54 231.10 Pass: Major Risk 2P Pad 432 2P-432 V11 396.75 400.00 220.68 8.08 212.60 Pass: Major Risk 2P Pad 434 2P-434 Vers#9b V1 Plan 397.30 400.00 180.57 8.12 172.46 Pass: Major Risk 2P Pad 438 2P-438 VO 2458.70 2550.00 117.79 54.55 63.23 Pass: Major Risk 2P Pad 441 2P-441 VO 399.33 400.00 40.63 7.69 32.94 Pass: Major Risk 2P Pad 445 2P-445 Vers#4 VO Plan: 525.80 525.00 39.52 10.13 29.39 Pass: Major Risk 2P Pad 447 2P-447 Vers#8b V2 Plan 754.09 750.00 80.58 14.19 66.39 Pass: Major Risk 2P Pad 448 2P-448 V2 502.71 500.00 101.57 9.37 92.20 Pass: Major Risk 2P Pad 448 2P-448A VO 502.71 500.00 101.57 9.37 92.20 Pass: Major Risk 2P Pad 448 2P-448PB1 VO 502.71 500.00 101.57 9.37 92.20 Pass: Major Risk 2P Pad 449 2P-449 VerS#6.b V1 Pia 401.85 400.00 120.60 7.92 112.68 Pass: Major Risk 2P Pad 451 2P-451 VO 325.62 325.00 160.49 6.34 154.15 Pass: Major Risk Meltwater North#1 MWN#1 MWN#1 VO 8610.11 4950.00 1582.26 294.73 1287.53 Pass: Major Risk Meltwater South #1 MWS#1 MWS#1 VO Out of range MWN#2 MWN#2 MWN#2 VO 2588.79 4125.00 4200.10 83.02 4117.08 Pass: Major Risk MWN#2 MWN#2 MWN#2A VO 2500.00 5375.00 3900.19 108.42 3791.76 Pass: Major Risk ORIGINAL e e MEL TW A TER - DRILLING HAZARDS SUMMARY 12 1,4" Open Hole & 9 5/8" Surface Casin2 Interval Event Risk Level Mitigation Strategy / Contingency Broach of conductor Low Monitor cellar continuously during interval Gas Hydrates Low If observed - control drill, reduce pump rates, reduce drilling fluid temperatures, additions of Lecithin Running sands & gravel Moderate Maintain planned mud parameters, Increase mud weight/viscosity, Use weighted sweeps, monitor fill on connections Drill surface hole into shallow Low Do not exceed the surface hole TD as detailed pressured interval- C-80 in the individual well plans, ensure that all charged stands (in the derrick or in the hole) are accounted for at all times Hole swabbingfTight hole on Moderate Circulate hole clean prior to trip, proper hole trips filling (use of trip sheets), pumping out of hole as needed Stuck surface casing Low Clean the hole before running casing, pump hiQh density hiQh viscosity sweeps, wiper trip Stuck pipe Low Keep hole clean, use high density high viscosity sweeps, keep pipe moving/rotating with pumps on whenever possible Lost circulation Low Keep hole clean. If losses occur - reduce pump rates and mud rheoloQY, use LCM 8 Vi' Open Hole & 7" x 4 Iii' Production Casin2 Interval Event Drill through a shallow pressured interval: C-80 to C-37 Insufficient or undetermined LOT Risk Level Moderate Moderate High ECD / Tight hole on trips/ Swabbing Moderate Differential sticking Moderate Barite sa Lost circulation Low High Miti ation Strate / Contin enc Carry out well control drills. Kill fluid stored on location, contingency 7" casing string on location, hei htened awareness Importance of LOT communicated to all parties, all parties familiar with LOT procedure. Test will be carried out until leak off is observed or to an FIT of 18 MW e uivalent Condition mud & clean hole prior to trips. Monitor ECDs with PWD tool while drilling across reservoir interval. Hole cleaning best practices. Backream out on trips as a last resort, proper hole filling (use of trip sheets Keep hole clean, periodic wiper trips, keep pipe movin /rotatin with urn s on whenever ossible Good drillin ractices as documented in well Ian Pretreat mud before drilling reservoir section, keep hole clean - use PWD to monitor hole cleaning. If losses occur - reduce pump rates and mud rheolo ,use LCM Meltwater Drilling Hazards Summary Prepared by Philip Hayden 11125/2003 ORIGINAL ->f .* -*ß> Rig: Doyon 141 Location: Kuparuk (Meltwater) Client: ConocoPhillips Alaska, Inc. Revision Date: 11/17/2003 Prepared by: Mike Martin Location: Anchorage, AK Phone: (907) 265-6205 Mobile: (907) 229-6266 email: martin13@slb.com < TOC at Surface Previous Csg. < 16",62.6#, H-40 grade Welded Connection at 108 ft. MD < Base of Permafrost at 1,388 ft. MD (1,352 ft. TVD) < Top of Tail at 1,491 ft. MD < 95/8",40.0#, L-80 grade BTC, AB Modified in 12 1/4" OH TO at 2,891 ft. MD (2,316 ft. TVD) Mark of Schlumberger ~ 2P-443 CemCADE" Preliminary Job Design 95/8" Surface Casing s Preliminary Job Design based on limited input data. For estimate purposes only. Volume Calculations and Cement Svstems (Volumes are based on 450% excess in the permafrost and 45% excess below the permafrost. Top of tail slurry is designed to be 103' below base of permafrost.) Lead Slurrv (minimum pump time 220 min.) ArcticSet III Lite @ 10.7 ppg, - 4.28 ft3/sk 0.7632 ft31ft x (108') x 1.00 (no excess) = 0.3132ft31ft x (1388' -108') x 5.50 (450% excess) = 0.3132 ft31ft x (1491' -1388') x 1.45 (45% excess) = 82.4ft3 + 2204.9 ft3+ 46.8 ft3 = 2334.1 ft3/ 4.28 ft3/sk = Round up to 546 sks 82.4 ft3 2204.9 ft3 46.8 ft3 2334.1 ft3 545.4 sks Have 410 sks of additional Lead on location for Top Out stage, if necessary. Tail Slurrv (minimum pump time 160 min.) LiteCRETE @ 12.0 ppg - 2.28 ft3/sk 0.3132 ft3/ft x (2891' - 1491') x 1.45 (45% excess) = 0.4257 ft31ft x 80' JShoe Joint) = 635.8 ft3 + 34.1 ft = 669.9 ft31 2.28 ft3/sk = Round up to 294 sks 635.8 ft3 34.1 ft3 669.9 ft3 293.8 sks BHST = 56°F, Estimated BHCT = 73°F. (BHST calculated using a gradient of 2 SF/1 00 ft. below the permafrost) PUMP SCHEDULE Stage Pump Rate (bpm) Stage Volume Cumulative Stage Time Time (min) (bbl) (min) CW100 5 10 2.0 2.0 Pressure test lines 10.0 12.0 CW100 5 30 6.0 18.0 MudPUSH II 6 40 6.7 24.7 Drop Bottom Plug 4.0 28.7 Lead Slurry 7 416 59.4 88.1 Tail Slurry 5 119 23.8 111.9 Drop Top Plug 4.0 115.9 Water 5 20 4.0 119.9 XO to rig pumps 4.0 123.9 Displacement 7 193 27.6 151.5 Bump Plug 3 20 6.7 158.2 MUD REMOVAL Recommended Mud Properties: 9.6 ppg, Pv < 15, Ty < 15. As thin and light as possible to aid in mud removal during cementing. Spacer Properties: 10.5 ppg MudPUSH* II, Pv? 17-20, Ty ? 20-25 Centralizers: Recommend 2 on shoe track and 1 per joint for next 700' to assist in mud removal. ORJGJNAL Rig: Doyon 141 Location: Kuparuk (Meltwater) Client: ConocoPhillips Alaska, Inc. Revision Date: 11/17/2003 Prepared by: Mike Martin Location: Anchorage, AK Phone: (907) 265-6205 Mobile: (907) 229-6266 email: martin13@slb.com Previous Csg. < 95/8",40.0#, L-80 grade STC, AS Modified at 2,891 ft. MD < 7", 26.0#, L-BO grade STC, AS Modified in 8 1/2" OH < Top ofTail at 8,615 ft. MD < X-over at 8,915 ft. MD < Top of Caim Fm. at 9,115 ft. MD < 41/2",11.6#, L-80grade 1ST Modified in 81/2" OH TD at 10,138 ft. MD (5,630 ft. TVD) Mark of Schlumberger ~ 2P-443 CemCADE" Preliminary Job Design 7" x 4 1/2" Casing Schlumb8Pg8P Preliminary Job Design based on limited input data. For estimate purposes only. Volume Calculations and Cement Systems Volumes are based on 75% excess. Top of tail slurry is designed to be 500' above top of Cairn formation. Tail Slurry (minimum thickening time 161 min.~ LiteCRETE wI D600G, D065 @ 12.5 ppg, 2.2 ft Isk 0.1268 ft3/ft x 300' x 1.75 (75% excess) = 0.3272 ft3/ft x (10138' - 8915') x 1.75 (75% excess) = 0.0873 ft3/ft x 80' ~Shoe Joint) = 66.6 ft3 + 700.3 ft + 7 ft3 = 773.9 ft31 2.2 ft3/sk = Round up to 352 sks 66.6 ft3 700.3 ft3 7 ft3 773.9 ft3 351.8 sks BHST = 139°F, Estimated BHCT = 119°F. (BHST calculated using a gradient of 2.5°F/100 ft. below the permafrost) PUMP SCHEDULE Stage Pump Rate (bpm) Stage Volume Cumulative Stage Time Time (min) (bbl) (min) CW100 5 10 2.0 2.0 Pressure test lines 10.0 12.0 CW100 5 50 10.0 22.0 Drop wiper Plug 5.0 27.0 MudPUSH II 6 30 5.0 32.0 Tail Slurry 7 138 19.7 51.7 Drop Top Plug 5.0 56.7 Displacement 8 344 43.0 99.7 Bump Plug 3 15 5.0 104.7 MUD REMOVAL Recommended Mud Properties: 9.6 ppg, Pv < 15, Ty < 15. As thin and light as possible to aid in mud removal during cementing. Spacer Properties: 10.5 ppg MudPUSH* II, Pv? 16-20, Ty? 30-33 Centralizers: Recommend 1- Y2 bow centralizers per joint from TD to TOC to aid in good mud removal for proper cement placement. ORIGINAL Meltwater 2P-443 In~tor Proposed Completion Schematic 4-1/2" Completion String 30" x 16" 62.6# @ +1- 108' MD (Insulated) Depths are based on Doyon 141 RKB Surface csg. 9 5/8" 40.0# L-80 BTC +1- 2891' MD /2316' TVD 7" 26# L-80 BTCM x 4 y." 12.6# L-80 IBT Mod crossover at +1- 8915' MD I 5071' TVD Future Perforations Production csg 7" 26# L-80 BTCM x 4 Y:." 12.6# L-80 IBT Mod +1- 10138' MD 15630' TVD 4 y." FMC Gen 5 Tubing Hanger, 4 y." L-80 IBT Mod pin down 4 Y:." 12.6# L-80 IBT Mod Spaceout Pups as Required 4 y." 12.6# L-80 IBT Mod Tubing to Surface 4 Y:." Cameo 'DB' nipple wI 3.875" No-Go Profile. 4 y." x 6' L-80 handling pups installed above and below, IBT Mod, set at +1- 500' MD 4 Y:." 12.6# L-80 IBT Mod tubing to landing nipple 4 y." x 1" Cameo 'KBG-2' mandrel wI shear valve, pinned for 3000 psi shear (casing to tubing differential), 4 y." x 6' L-80 handling pups installed above and below, IBT Mod 4 Y:." Baker 'CMU' sliding sleeve wI 3.813" Cameo DB profile, IBT Mod box x pin. 4 y." x 6' L-80 IBT Mod handling pup installed above 4 y." Cameo 'DB' nipple wI 3.75" No-Go profile. 4 Y:." x 12' L-80 IBT Mod spacaeout pup installed above, 4 Y:." x 6' handling pup installed below 4 Y:." Baker 80-40 GBH-22 casing seal assembly wI 15' stroke, 4 y." L-80 IBT Mod box up, 4 Y:." x 6' L-80 IBT Mod handling pup installed on top Baker Seal Bore Extension, 7" BTCM x 4 y." IBT Mod SBE set at +1- 200' MD above the top of the Bermuda interval (or 200' MD above the Cairn if present) OR ~ GJ ~'.Þtt~ 11/25/2003 RE: Permit Application-2P-443 e e Sub.iect: RE: Pcrmit Application-2P-443 From: "llaydcn, Philip" <Philip.Haydcn(~.l~conocophillips.col11> Datc: Wcd, 03 Dcc 2003 16:36:24 -0900 To: "Tom Maunder (E-mail)" <t0111_maunderØ)admin.statc.ak.us> CC: "I layden, Philip" <Philip.JIayden~Yconocophillips.com> Tom, Attached are two files, one a plot indicating wells within 1320 ft of 2P-443 at the top of Cairn and the other a tabular representation of the same. The cementing and LOT/FIT details of these two wells (2P-431 & 438) have been forwarded to you as part of the application for annular disposal for wells 2P-422 and 2P-429 respectively. If you need anything else please let me know. Philip -----Original Message----- From: Thomas Maunder [mailto:tom maunder@admin.state.ak.us] Sent: Wednesday, December 03, 2003 11:41 AM To: Hayden, Philip Subject: Permit Application-2P-443 Hi Philip, I am working on this application and I needed to make a request. Since this is an injection well, one of item we look at is what is known as an area of review. This is a process of looking at the operational and cementing records for the wells within 1/4 mile of the planned wellbore. You have provided similar information for the annular disposal applications. Could you please provide a "1320" plot or search for the wellbores within 1/4 mile radius of 2P-443?? It should include plug backed wellbore sections as well. Please use the top of the Cairn as the datum. Call with any questions. Thanks. Tom Maunder, PE AOGCC .. 2P-443 Horizontal Content-DescriptIon: CI PI t d earance o. oc 2P-443 Horizontal Clearance Content-Type: Content-Encoding: application/msword base64 lof2 12/9/2003 3 :29 PM RE: Permit Application-2P-443 e e I..".. Horizontal Clearance 20f2 2P-443 Horizontal Content-Description: Clearance Report.doc application/msword base64 Content- Type: Content-Encoding: 12/9/2003 3:29 PM ConocóP'hillips e Post Office Box 100360 Anchorage, Alaska 99510-0360 Randy Thomas Phone (907) 265-6830 Email: Randy.L.Thomas@conocophillips.com November 26, 2003 RECflVS Þz01 D AJaskaOiI & Gas 2003 .4nch;:C~ Alaska Oil and Gas Conservation Commission 333 West ¡th Avenue Suite 100 Anchorage, Alaska 99501 Re: Applications for Permits to Drill, Meltwater injector, 2P-443 and producer 2P-424 ~ Dear Commissioners: ConocoPhillips Alaska, Inc. hereby applies for Permits to Drill for an onshore injection well and an onshore production well in the Bermuda sands of the Meltwater oil pool. Please find attached for the review of the Commission Form 10-401 and the information required by 20 ACC 25.005 for both of these wells. The expected spud dates are as follows: 2P-424 January 2, 2003 2P-443 January 23, 2004 If you have any questions or require any further information, please contact Philip Hayden at 265-6481. Sincerely, ~ \-~-:7 Randy Thomas Greater Kuparuk Area Drilling Team Leader e e ConocoPhillips Alaska, Inc. Drill Site 2P 443 slot #443 Meltwater North Slope, Alaska H 0 R I Z 0 N TAL P LAN E C LEA RAN C ERE P 0 R T by Baker Hughes INTEQ Your ref Our ref License 2P-443 Vers#3.a prop4479 Date printed Date created Last revised 3-Dec-2003 23-Feb-2001 19-Nov-2003 Field is centred on 441964.235,5869891.466,999.00000,N Structure is centred on 441964.235,5869891.466,999.00000,N Slot location is n70 3 8.704,w150 27 3.668 Slot Grid coordinates are N 5868880.800, E 443640.260 Slot local coordinates are 997.96 S 1683.84 E Projection type: alaska - Zone 4, Spheroid: Clarke - 1866 Reference North is True North Report is limited to clearances less than 2000 feet DECREASING CLEARANCES of less than 1000 feet are indicated by an asterisk, e.g. 487.4* - '''';:.... ·11" LonoCot'nl IpS e ConoeoP s Alaska, Inc. Well : 443 Location : North DEpthsc'E RKB(DaYD" Structure: Drill Site 2P Field: Meltwater 2900 2800 2700 2500 25ac 2400 2300 2200 2100 2000 '-\~~ 1320 ft 1 C~';~g <- West (feet) T~.1(Top CO~"} e Dot~ plotted 3-0e,,-2C03 Plol Ref€f~n~e ;s 2P-443 V"rsN3.'l Co,,'dino1es ore in feet ,e1e'~~o~ slol 1/443 Alaska Scale 1 inch'" 100 It "0 4900 VI " ~ c c " (J) o o '" " ,; I V &lj2Co';"9 e - ConocoPhillips Alaska, Inc. Drill Site 2P,443 Meltwater,North Slope, Alaska CLEARANCE LISTING Page 2 Your ref 2P-443 Vers#3.a Last revised : 19-Nov-2003 Reference wellpath Object wellpath MWD <0 - 9685'>,,431,Drill Site 2P -- V() ð - CJS S M.D. T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Horiz Horiz MinIm Bearing Dist Dist 61.6 1559.6 1392.2 ... 9115.2 5162.0 6722.9S 1466.9W 8388.3 5162.0 5982.0S 94.5W All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level). Total Dogleg for wellpath is 0.00 degrees. Vertical section is from wellhead on azimuth 192.31 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ - e ConocoPhillips Alaska, Inc. Drill Site 2P,443 Meltwater,North Slope, Alaska CLEARANCE LISTING Page 1 Your ref 2P-443 Vers#3.a Last revised : 19-Nov-2003 Reference wellpath Object wellpath MWD <0-9224'>,,438,Drill Site 2P -- dO~-O)çd Horiz Horiz MinIm M.D. T.V.D. Rect Coordinates M.D. T.V.D. Rect Coordinates Bearing Dist Dist 9115.2 5162.0 6722.98 1466.9W 7950.8 5162.0 5142.4S 1719.9W 350.9 1600.6 1071.4 All data is in feet unless otherwise stated. Casing dimensions are not included. Coordinates from slot #443 and TVD from RKB (Doyon 141) (252.00 Ft above mean sea level). Total Dogleg for wellpath is 0.00 degrees. Vertical section is from wellhead on azimuth 192.31 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ 8.1 ppg pressured shallow zone e . SHARON K. ALLSUP-DRAKE CONOCOPHILLlPS 3760 PERENOSA ANCHORAGE AK 99515 1010 ,~) ~ J ./~? ~, . "~. ~ DATE V{: U?<-< ~,.! f' II ~fi:~1 (eo.oC) PAY TO THE ORDER OF ~- C CHASE Chase Manhattan Bank USA, N.A. Valid Up To 5000 Dollars , 2DO White Cray Center Dr" Newark. DE 19111 MEMO 7P_ /if;; t.-.'", 11 'f /' I: 0 j . .00 . ~ ~ I: 2 . 8 ~ 7 . q 0 7 q 2 7 b II- .0 .0 e e TRANSMIT AL LETTER CHECKLIST CIRCLE APPROPRJA TE LETTERIP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME KRU Zp,.. '1',13 2C> 3" 2-D 'I PTD# CHECKWBAT ADD-ONS "CLUE" APPLIES (OPTIONS) MULTI Tbe permit is for a new wellbore segment of LATERAL existing well ~ Permit No, API No. . (If API num ber Productionsbould continue to be reported as last two (2) digits a function· of the original API number stated are between 60-69) above. PJLOT HOLE In accordance with 20 AAC 25.005(1), all (PH) records, data and logs acquired for the pilot bole must be clearly differentiated in botb name (name on permit plus PH) and API Dumber (50 - 70/80) from records, data and logs acquired for well (name on permit). SPACING Tbe permit is approved subject to full EXCEPTION compliance witb 20 AAC 25.055. Approval to peñorate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) assumes tbe liability of any protest to tbe spacing . exception tbat may occur. DRY DITCH An dry ditcb sample sets submitted to tbe SAMPLE Commission must be in no greater than 30' sample intervals from below tbe permafrost or from wbere samples are first caught and 10' sample intervals tbrough target zones. Rev: 07/] 0102 C\jody\templates Field & Pool KUPARUK RIVER, MEL 1WA TER OIL - 490140 Well Name KUPARUK RIV U MELT 2P-443 Program SER Well bore seg 0 COPHILLlPS ALASKA INC Initial ClasslType SER/PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ~ - Administration Eermit fee attached_ - - - - - - _ _ _. Yes - - - - 2 teas~ _number .apRrORriate. - - - - - - _ x~s - - - - - - - - - -- - - - - - - - - - - - - - - - - - -- 3 _U_n[que weltn_arn~_aod oumb_er _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Y~s - -- - - - - - - - - - - - - - -. - - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - ~ - - 4 WeJlJocat~d [na. d_efil]ed .pool - - - - _ _ _ _ _Y~s - - - - - - - - - - - - 5 WellJQcat~d properdistaoce from drUling ul]itb_oUl]dary_ _ _ Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 6 WellJocat~d properdislaoce_ from QtheJ wells_ _ - - - X~$ CQnseryatioo Ord_er IIIQ. A56A: _ Spaciog units ar~ J 0 acre¡¡. - - - - -- - - -- 7 S_ufficiel]t _acreage_ayailable [ndJilliog unjt. - - - - - - - - - _ _ _ _ _ X~s - - - - - - - - - - - -- - - - - - - - - 8 Itd~viated, js_ weJlbQre plaUncJu.ded _ - - - -- _ X~s - - - - - - - - - - - - - - - - - . - -- 9 _O-perator ol]ly- aff~cted party _ _ - - - - - - - - - - - - - . . - - _Y~$ - - - - - - -- - - - - - - - - - - - - - - - - - - 10 _O-perator bas_appropriate_bond inJQrce _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _Y~s - -- - - - - - - - - - - - - - - ~ - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 11 P~rmit c_ao be issued witbQut COMerva.tion order _ _ - - - - - - - - - _ _Y~s - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 12 P~rmitcao be issued withQut adrnil]i¡¡trati\(e_apprpvaJ _ _ - - - - - - - - - .Y~$ - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - SFD 12/9/2003 13 Can permit be approved before 15-day wait Yes 14 WelUQcated within area and_strataauthQrized by ojectioo Order # (put 10# incornmeots)_ (For_ Yes 8rea Injectio_n_Qrder No.. 2L - - - - - -- - - - - - - - - - - - - - - - - - - - - e 15 AJI wellsJ''lithin Jl4J'lJile_area_of reyiew jd~ot[fied (Fpr ~ervj~ wellOl]IYL _ _ _ _ _ _ _ _ _ _ _ _ _ _ y~s - -- IIIQne_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - - - - - - - - - - - - -- - - - - - - - - -- 16 Pre-produ_ced iojector; duratiQn_of pre-production tess_ than. 3 mOllths. (For_service well onJy) _ _ No_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - 17 _ACME Fïllding 9f CQn_si$teOGY has been j¡¡sued_ fOL tbis pr_oiect - - - - - - .NA WelJ drilled frQm an existing drill site> _ - - - - - - - - - - Engineering 18 _C_oodu_ctor ¡¡trillgPJQvided . _ _ . . _ _ . - - - - - - - - - - - - - - y~s - - - - - - - - - - - -- - -- 19 _S_urfa~ca~il]gpJQtect~ all_known USDW¡¡ _ . - - - - - - NA 811 aquifer¡¡ ex~mpt~d,AOCfR 102 (b)(3) _ . . _ _ _ . - - - - - - . - -- 20 _CMTyotadeQuateJo circ_utateon_cond_uctoL& SUJtcsg _ . . . _ _ - - - -- Y~s - - - -- - - - - - - - - - - - - -- - - - - - - - -- 21 _CMT v_ot adeQuateJo tie-inJQngstring to.surf ç¡;g_ _ _ . _ _ . _ _. No_ 8nn_utar disp9sal may be proposed. _ _ _ . _ _ _ - - - - - - - - - - - - - - - - 22 _CMTwill coyer,all known_productiye bQrizon_s_ _ _ . - - - - - . . . _Ye$ - - - - - - - -- - - - - - - - - - - - - - - - 23 C_asiog desigo~ ad_eClua_te for C,T, B _&_ p-ermafrost _ _ . _ _ . . - - - - - - - .Y~s - - - - - - - - - - - - - - - - - - 24 Adequate.tan_kage_oJ reserye pit _ _ . - - - - - - - - - - - - - - - - -- yes Rig ~Quipp_ed with ¡¡teel pits,NoJes~rve pit plal]n~d.. Waste to_an_approve_d_anouJus_or disposal_well. - - . 25 Jtare-drilL bas_a to:403 fQr abandQnment beeo aRPJQved . - - - - .NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26 Adequatewellbore.¡¡eparatjo_n_propo¡¡ed_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ - _Y~s - -- I?rp~imity- anjllysi¡¡ pertorme_d, C!ose aRPJQaçhe_sjdentjfi~d._ TraveJing c-ylinder Riot jn_ctuded> _ _ _ _ _ - - _ _ - _ _ 27 Jtdjverter.required, dQes iLmeet reguJations_ _ _ _ _ _ _ _ - - - - - - - - - - - - - - .Y~s - - - - - - - - - - - - - - -- - - - - - - - - - - -- - - - - - - - -- Appr Date 28 .DJilliog fJujd_ Rrogram schematic_& e(tuip Jistadequate _ _ _ _ . . . _ _ . . _ _ _ . - - - - - Y~$ Expected BH :) in _B~rmu_da 5--1 _tQ 7.2 EMW. _ :)Ian.ned MW 9.6. _ Risk_ Qf shaJlowe.r higber preSSUJe identified> . TEM 12/9/2003 29 _BOPEs,d_o _they meet reguJation _ _ . - - - - - - - - - - - - - -- - Y~s _ . Surface. ¡¡hpe integrity is_geoerally greater thaI] 15.Q EMWJndjc.alillg_sta_ndard well GontrQI app-lies... . e Utt7\¡J'. \ð ~ 30 .BOPEpre_ss ra_tiog appropriate; _test to Jput p¡¡ig in _comments)_ - - - - -- _Y~s M8SF=> caIGuJate_dJor_B_ermuda H97.p_st350Q psi ap-propriate.. F=> :)CQ us_uallyJests to 50QO_p-st . . _ - . 31 Choke_manifQld cQmpJies. w/APtR :)-53 (May 84L . . . _ _ . - - - - - - . . - - Y~$ - - -- - - - - - - - - - - - - - - - - - - - - -- - - - - - - - -- 32 WQrk will oGc.ur withoutoperationsbutdown_ _ . - - - - - - - - Y~s - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 33 J¡¡ Rre~eoce_ Qf H2S gas_ RroQable. _ _ _ _ _ _ _ _ - - - - - - - - - - ... _ No_ - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - -- 34 MechanicaLcondJt[on p{wells withill80R yerified (For_s_ervlce welJ QnJy) _ _ _ . _ _ _ _ . _ _ . Y~s Bas~d On the TOR of _the_ CajrO,JheJe are .no wells_witbin V4 Jllile 9f 2F1-443, - - - - - - - - - - - - -- Geology 35 .P~rmit cao be tssued wlo_ hydrogen_ s.ulfide measures _ - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - 36 _D_ata.PJesented on_ Rotential PveJRre¡¡sUœ .zone$. _ _ _ _ _ _ - - - - - - _ _ Yes WelJ will be drilled between _2P-431 and_2P:438, Qoth Qf wbich encountered_ a pre¡¡sured shaJlow lQne._Re_seryQir Appr Date 37 S~tsmicanalysJs. of shaJlow gas_zpoes_ _ . . _ _ . _____NA may- be u.nderpœssured, BQth are discu_ssed in _DJilliog Hazards InfQrmation $ectiol] (P,3) al]d_ Qn_QriJliog - - - -- SFD 12/9/2003 38 _S~abedcOl]diti¡:m survey (if Off-¡¡h_ore) _ _ . .NA Hazards Summary _sbeet. - - - - - - - - - - - - - 39 _ Conta_ctnam.elphOl]eJorweelsly progre¡¡s.reports [explQratory .DOly] - - - - - - - - - NA - - Geologic Engineering Public gp /~ Commissioner Date: Commissioner Date Commissioner Date /0 ÞT5 2.110(3