Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout203-146
e e
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
~ 0'3 - J ~ b Well History File Identifier
o Two-sided 1111111111111111111
Organizing (done)
o Rescan Needed 1111111111111111111
RESCAN
~Ior Items:
o Greyscale Items:
DIGITAL DATA
~iskettes, No. ,
o Other, NolType:
OVERSIZED (Scannable)
o Maps:
o Other Items Scannable by
a Large Scanner
o Poor Quality Originals:
OVERSIZED (Non-Scannable)
o Other:
o Logs of various kinds:
NOTES:
Date 5/ID100
, I
o Other::
/5/
IMP
1111111111111111111
1ME
BY: CMaria ~
Project Proofing
BY: ~
/5/
Scanning Preparation
BY;
Date: <5
+ JitL = TOTAL PAGES r¡ ¿ P
(Count does not include cove~A
/5/ r q
Production Scanning
Stage 1 Page Count from Scanned File: 4+ (Count does include cover sheet)
Page Count Matches Number in scannrg P¡reparation: ~YES
BY: ~ . Date:ò/IO 0"
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES
1111111111111111111
NO
/5/ VVVP
NO
BY:
Maria
Date:
/5/
1111111111111111111
Scanning is complete at this point unless rescanning is required.
ReScanned
1111111111111111111
BY:
Maria
Date:
/5/
Comments about this file:
Quality Checked
11111111/111 1111111
10/6/2005 Well History File Cover Page.doc
w •
~.=;~: __
MICROFILMED
43/01 /2008
DO NOT PLACE
;, ==, ,
- ,
,,~ -
a: .~
~:
'.
x --.
{
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\C~rPgs_Inserts\Microfilm_Marker.doc
¡ D ~ Átð1,
DATA SUBMITTAL COMPLIANCE REPORT
4/24/2006
5(l(.AJ ìI/J.ô) ~h >
API No. 50-029-22011-02-00
Permit to Drill 2031460
Well Name/No. PRUDHOE BAY UNIT 02-29B
Operator BP EXPLORATION (ALASKA) INC
MD 1 0707 ~ TVD 8873 r Completion Date 4/10/2004 /'
Completion Status P&A
~.
Current Status P&A
-.."..^."
REQUIRED INFORMATION
Mud Log No
Directional survQ
Samples No
DATA INFORMATION
Types Electric or Other Logs Run: MWD / GR / CCL / Press, GR / CNL / CCL
Well Log Information:
Log/
Data Digital
1: TY00.. M,dlFnnt
C Las
D
I;:
.tZ" C Lis
~.
(data taken from Logs Portion of Master Well Data Maint
Electr
Dataset
Number Name
12560 Gamma Ray
.
Interval
Start Stop
8745 9339
Log Log
Scale Media
Run
No
1
OH /
CH
Case
Received Comments
5/4/2004 CGM TIF PDF GRAPHICS I
I
Directional Survey
Directional Survey
Gamma Ray
Gamma Ray
12828 Gamma Ray
12828 LIS Verification
5 Blu
5 Blu
9426 10707 1/22/2004
9426 10707 1/22/2004
9450 10707 Open 11/12/2004 GRlMWD/DSN 12828
9450 10707 Open 11/12/2004 GRlMWDIDSN 12828 J
9430 10707 Open 11/12/2004 MWD/GRlDIRIDSN12828
9430 10707 Open 11/12/2004 MWD/GRlDIRlDSN12828
Sample
Set
Received Number Comments
.
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
ADDITIONAL INFORM~ION
Well Cored? Y N.i)
Daily History Received?
Ò
((j'/ N
Chips Received? .~
Analysis
Received?
Formation Tops
~
Comments:
DATA SUBMITTAL COMPLIANCE REPORT
4/24/2006
Permitto Drill 2031460
Well Name/No. PRUDHOE BAY UNIT 02-29B
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-22011-02-00
MD 10707
C,"eot S",", P&A « ~ UIC N
Date: ~ 0
TVD 8873
Completion Status P&A
Compliance Reviewed By:
.
.
.
Transmittal Form
. ,~0.3- /'110
,,¡_
BAKER
HUGHES
INTEQ
To: AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska
99501
Attention:
]lØbln Deason
---,."
RECE\VED
Reference: 2-29B
Contains the following:
."~.
1 LDWG Compact Disc
(Includes Graphic Image files)
1 LDWG lister summary
Anchorage GEOScience Center
¡ . ,. '\ ~..~ 2004
.\1 ,,,,,,,\,n~I'!<~~." 'I
Arlr,h~. ~
11111'"
1 blueline - GR/Directional Measured Depth Log
1 blueline - GR/Directional TVD Log
LAC Job#: 580841
~
Receive
Date: Nov 2, 2004
Date: / {/Í2..~ {
/ I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING
OR FAXING YOUR COPY
FAX: (907) 267-6623
Baker Hughes INTEQ
7260 Homer Drive
Anchorage, Alaska
99518
Direct: (907) 267-6612
FAX: (907) 267-6623
-"..
e
WELL LOG
TRANSMITTAL
.
ProActive Diagnostic Services, Inc.
To: State of Alaska AOGCC
333 W. 7'" Street
Suite # 700
Anchorage. Alaska 99501
RE; Distribution - Final Print(s]
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of :
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 1369
Stafford, TX 77497
BP Exploration (Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
LOG DIGITAL MVLAR / BLUE LINE REPORT
WELL DATE TYPE OR SEPIA PRINT[S] OR
CD-ROM FilM COLOR
Open Hole 1 1 1
Res. Eva!. CH 1 1 1
OS 02-29b 4-9-04 .:H.. I ~e~1t- C~ 1
.l.ö"\ - 14 "
,.
Caliper Survey
Print Name:
þ~ ()))J
I ~W~toL (jwk<l
Date: } L1J.l) ~.~ '1
Signed :
PRoAcTivE DiAGNOSTic SERviCES, INC., PO Box 1 ~69 STAffoRd 1X 77477
Phone:(281) 565-9085 Fax:(281) 565-1369
E-mail: pds@memorylog.com
Website: www.memorylog.com
· STATE OF ALASKA I
ALASKA~L AND GAS CONSERVATION COMM dSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
n/ED
(} 82004
" ,.' /,"' '"
1a. Well Status: 0 Oil o Gas o Plugged IBI Abandoned o Suspended o WAG 1 b. Wé1f'Clas~:""¡" \A·",',VU"""", 1'\\iT'
20AAC 25.105 20AAC 25.110 IBI Development ,~,,(dlmlS(ploratory
OGINJ OWINJ o WDSPL No. of Completions Zero Other o Stratigraphic Test o Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 4/10/2004 203-146 304-082
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 11/20/2003 50-029-22011-02-00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number:
Surface: 11/22/2003 PBU 02-29B
887' SNL, 1740' EWL, SEC. 36, T11N, R14E, UM 8. KB Elevation (ft): 15. Field 1 Pool(s):
Top of Productive Horizon:
92' NSL, 4931' EWL, SEC. 25, T11 N, R14E, UM KBE = 63' Prudhoe Bay Field / Prudhoe Bay
Pool
Total Depth: 9. Plug Back Depth (MD+ TVD)
1055' NSL, 4895' EWL, SEC. 25, T11N, R14E, UM 10707 + 8873 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 688489 y- 5950336 Zone- ASP4 10707 + 8873 Ft ADL 028308
TPI: x- 691654 y- 5951395 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 691593 y- 5952357 Zone- ASP4 N/A MD
18. Directional Survey 19. Water depth, if offshore 20. Thickness of Permafrost
IBI Yes ONo N/A MSL 1900' (Approx.)
21. Logs Run:
MWD 1 GR 1 CCL 1 Press, GR 1 CNL 1 CCL
22. CASING, liNER AND CEMENTING RECORD
~~~~~i ."" EPTH MD SETTII\IGI !<P'1'H'1'VP HOLE At.A9q~fJ'
··.WÌ';PER FT. GRÆPe TOP I BOTTOM TORi BOTTOM SIZE PULLED
20" 91.5# H-40 Surface 112' Surface 112' 30" 2150# Poleset
13-3/8" 68# L-80 Surface 3923' Surface 3704' 17-1/2" 2000 sx CS III, 600 sx Class 'G'
Top Job: 250 sx CS II
9-518" 47# L-80 Surface 9099' Surface 8401' 12-1/4" 1450 sx Class 'G'
7" 29# L-80 8683' 9443' 7993' 8738' 8-1/2" 250 sx Class 'G'
23. Perforations open to Production (MD + TVD of Top and 124. luallllG i'
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 3011'
MD TVD MD TVD 3-1/2", 9.3#, L-80 3011' - 8740' 8636'
2$.i' 'ACID,. IJEMENT E'[þ.
, DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9171' P&A with 13 Bbls Class 'G'
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BaL GAs-McF W A TER-BaL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD ..
Flow Tubing Casing Pressure CALCULATED .. OIL-BsL GAs-McF W A TER-BsL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". 1U" 0 ß mt\~
-
None ¡ co,\~; ØßtMSBfL
DÞ,T£
VERlFJED OR'G'~LA'
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE SIDE
~
(;(
28. GEOLOGIC MARKERS
NAME MD TVD
24N 9472' 8766'
24P 9483' 8777'
23N 9514' 8804'
23P 9516' 8806'
Zone 2A / 22N 9553' 8837'
22P 9558' 8841'
21N 9593' 8867'
21P 9599' 8871
Zone 1 B 9625' 8887'
14N 9660' 8904'
14P 9668' 8907'
Zone 1A 9677' 8910'
13N 9759' 8927'
13P 9784' 8929'
29.
FORMATION TESTS
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
None
RE
JUN 082004
A\àska em
30. List of Attachments: Summary of Daily Drilling Reports, and P&A Work, Surveys
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ./ T tl T h· I A t t
Terrie Hubble / OJ i e ec Olea ssis an
203-146 304-082
Permit No. / A roval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
PBU 02-29B
Well Number
Date Olo-O
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubb/e, 564-4628
Thomas McCarty, 564-4378
ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
Move rig from DS 7 to DS 2. Escorted by security and CPS.
Raise derrick. Scope derrick. Move rig camp and spot same.
Inspect pad & tree. Move rig over well.
23:00 - 00:00 PRE NU BOP
11/12/2003 00:00 - 04:00 PRE NU BOPS, kill & choke lines. Spot return & cuttings tanks.
Run and test hardline. Install modified goose neck on injector.
Prep pipe shed. Load tools. Spot Tech Limit, MWD & MI
shack.
04:00 - 09:00 5.00 PRE Test BOPs. Witness waived by J. Jones AOGCC. PU2"
e-line reel.
09:00 - 12:00 3.00 STWHIP P WEXIT Pu injector and install packoff. Stab coil in injector. MU E-line
patch cord in reel.
12:00 - 15:00 3.00 STWHIP P WEXIT Install coil connector and head up with E- line. PT coil
connector
15:00 - 16:00 1.00 STWHIP P WEXIT stab on to well and circulate MEOH out of coil.
16:00 - 17:00 1.00 STWHIP P WEXIT Pick up pilot hole milling BHA.
17:00-19:10 2.17 STWHIP P WEXIT RIH to tie in at 9000'.
19:10 -19:50 0.67 STWHIP P WEXIT Tie-in correction -22'.
19:50 - 20:45 0.92 STWHIP P WEXIT Tag at 9438' . FS 2520 psi at 1.8 bpm. Drill cement 1.8 bpm
90 + ROP to Gas allarm divert thru gas buster seeing some
crude in returns. Cleaned up continue to drill to 9459' Decision
point per program. Drill rate indicates poor cement WOB
varing and motor work varing.
20:45 - 21 :30 0.75 STWHIP N CEMT WEXIT Call Dan Kara reviewed options. Agreed to have DD evaluate
option of lower KO. DD advised that target could be met with
40/100 build. This lower KO 6'. Agreed to drill to 9482.
21 :30 - 22:00 0.50 STWHIP P WEXIT Drill to 94821.8 bpm 3180 psi 80+ ROP WOB O-AK.
22:00 - 00:00 2.00 STWHIP N CEMT WEXIT Notified Dan Kara. Agreed to POH for underreemer.WiII under
ream to 9550'. POH.
11/13/2003 00:00 - 01 :30 1.50 CLEAN N CEMT WEXIT POH to surface.
01 :30 - 03:00 1.50 CLEAN N CEMT WEXIT Set back injector. LD mill and 1.75 motor mill in-gauge. PU
under reamer and straight motor. PU injector and stab onto
well.
03:00 - 04:30 1.50 CLEAN N CEMT WEXIT RIH to 9020
04:30 - 04:45 0.25 CLEAN N CEMT WEXIT Tie in correction -17A'.
04:45 - 07:00 2.25 CLEAN N CEMT WEXIT RIH to 9425. Un reaming at 1.5 bpm at FS = 2220 psi. MWat
9450
07:00 - 09:00 2.00 CLEAN N CEMT WEXIT Continue undereaming at 9508'. Hard cement below here.
Ream to 9515'. Circulate bio sweep around.
09:00 - 11 :45 2.75 CLEAN N CEMT WEXIT Open EDC. Circulate out of hole
11:45 - 12:30 0.75 CLEAN N CEMT WEXIT At surface. Get off well. LD BHA. Undereamer blades showed
good wear pattern.
12:30 - 13:30 1.00 ZONISO N CEMT WEXIT Oisplace e-line reel to meoh.
13:30 - 13:45 0.25 ZONISO N CEMT WEXIT Pressure test well bore to 2000 psi. Held solid.
13:45 - 14:15 0.50 ZONISO N CEMT WEXIT Hold PJSM before beginning reel swap.
14:15 - 18:00 3.75 ZONISO N CEMT WEXIT Ustab pipe from injector. Spool onto reel and secure same.
Drop reel onto trailer.
18:00 - 18:15 0.25 ZONISO N CEMT WEXIT PJSM for reel swap with new crew.
18:15 - 22:00 3.75 ZONISO N CEMT WEXIT Swap reel. Cut off internal grapple. Pull coil to injector. Stab in
22:00 - 23:30 1.50 ZONISO N CEMT WEXIT Pump dart. Pump 1-3/8" ball.
23:30 - 00:00 0.50 ZONISO N CEMT WEXIT MU Cementing nozzle
11/14/2003 00:00 - 00:15 0.25 ZONISO N CEMT WEXIT MU Cement nozzle.
00:15 - 02:00 1.75 ZONISO N CEMT WEXIT RIH with cementing assy. Tag at 9518' uncorrected. PU ten
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
Spud Date: 2/26/1990
End: 11/29/2003
11/11/2003
11/29/2003
N2
11/14/2003 00: 15 - 02:00
02:00 - 02:45
02:45 - 03:00
03:00 - 04:40
04:40 - 05: 10
05: 1 0 - 08:00
08:00 - 09:30
09:30 - 11 :30
11 :30 - 12:00
12:00 - 12:30
12:30 - 15:30
15:30 - 18:00
18:00 - 19:30
19:30 - 20:00
20:00 - 20:15
20:15 - 21:45
21 :45 - 22:00
22:00 - 22:10
22:10 - 00:00
11/15/2003 00:00 - 02:20
02:20 - 02:40
02:40 - 04:30
04:30 - 05: 15
05:15 - 07:30
07:30 - 08:00
08:00 - 09:00
09:00 - 12:45
12:45 - 15:00
15:00 - 18:00
18:00 - 22:45
1.75 ZONISO N
0.75 ZONISO N
0.25 ZONISO N
1.67 ZONISO N
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
0.50 ZONISO N
2.83 ZONISO N
CEMT WEXIT
CEMT WEXIT
1.50 ZONISO N
CEMT WEXIT
2.00 ZONISO N
CEMT WEXIT
0.50 ZONISO N
0.50 STWHIP N
3.00 STWHIP N
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
2.50 STWHIP N
CEMT WEXIT
1.50 STWHIP N
0.50 STWHIP N
0.25 STWHIP N
1.50 STWHIP N
0.25 STWHIP N
0.17 STWHIP N
1.83 STWHIP P
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
WEXIT
2.33 STWHIP P
WEXIT
0.33 STWHIP P
WEXIT
1.83 STWHIP P
0.75 STWHIP P
2.25 STWHIP P
WEXIT
WEXIT
WEXIT
0.50 STWHIP P
WEXIT
1.00 STWHIP P
3.75 STWHIP P
WEXIT
WEXIT
2.25 STWHIP P
WEXIT
3.00 STWHIP P
WEXIT
4.75 STWHIP P
WEXIT
and flag pipe.
RU cementers.
PJSM for cement job.
Prime up and test lines .RIH to flag 23 k up and 12 k dn. Pump
50 bbl KCL,@ 2.2bpm 3500 psi. Tag TD to flush bio water
from rat hole. Pick up to flag continue pumping balance of 50
bbl KCL followed by 2 bbl fresh H20. 13 bbl17ppg cement,
Displace with 50 bbl KCL Displace cement to nozzle +4 bbl.
POH at 52 ftImin pumping 2 bpm.TOC 9177. PU to 9000'
Wait on cement
RIH to 9385 containiating cement 2bpm at 26 ftImin. POH
chasing cement to surface. Wash each GLM while POOH.
Get off well. MU swirl nozzle. Get on well and jet out BOP
stack to remove any cement
Hold PJSM to dicuss reel swap with crew. Unstab coil. Secure
to reeL.
Drop 2" coil on to Peak trailer.
PU 2" e-line coil.
Attach stabbing line to coil. Unsecure coil from reel. Pull coil
across top of pips shed. Work down through injector.
MU Kendal coil connector and pull test MU hard line inside
reel.
Circulate out methanol from E coil. Circulate to warm coil.
PT connector to 3500 psi.
MU pilot milling assembly
RIH to 9030'
Tie-in correction -22'.
RIH dry tag at 9388
Drill 1.8 bpm . FS=3000 psi. UP wt 26K, DN wt 14K. Drill
cement at 3300 psi 1.5 WOB 1.8 bpm 14-27 ROP. Drill
cement to 9425
Drilling cement to 9477'. FS = 3300 psi. Drill at 1.8 bpm. 3600
psi 1.5k WOB ROP 23'. TF 145R
Drill ramp to 9485. TF 35L 1.8 bpm, 3600 psi. ROP 32 fph.
WOB 1.2K.
POH.
Change out BHA.
RIH. Having a problem with pilot pressure control. Call
mechanics.
Tie into EOP flag at 8900'. -20' correction. RIH to 9020. Log
gr tie in. 0' correction.
Replace pilot pressure control in ops cab. Test same.
RIH to btm of pilot hole. Tag at 9485'. PU 10' and begin
pumping at 1.6 bpm/3000 psi. RIH. Tag up. Flag pipe. PU 1 '.
Begin time milling as per well plan schedule at TF:35L WOB:
0.1K#
Back to flag at 9485'. 3060 psi @ 1.59 bpm. 0.0# WOB.
TF:35L Continue milling as per schedule.
Milling at 9486.0. 0.0# WOe. Metal on magnets. Start taking
weight at 9488'. Mill to 9489'.
Mill to 9492 1.6 bpm 3250 psi. Can't get drill off. Can't get at
stall. Acts like hanging in window. Backream thru window see
motor work at top of window. Ream back to bottom 4.6K WOB
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
Spud Date: 2/26/1990
End: 11/29/2003
11/11/2003
11/29/2003
N2
11/15/2003 18:00 - 22:45 4.75 STWHIP P WEXIT
22:45 - 00:00 1.25 STWHIP P WEXIT
11/16/2003 00:00 - 00:30 0.50 STWHIP P WEXIT
00:30 - 01 :30 1.00 STWHIP P WEXIT
01:30-03:15 1.75 STWHIP P WEXIT
03: 15 - 03:30 0.25 STWHIP P WEXIT
03:30 - 03:40 0.17 STWHIP P WEXIT
03:40 - 06: 15 2.58 STWHIP P WEXIT
06: 15 - 07:30 1.25 STWHIP P WEXIT
07:30 - 08:45 1.25 STWHIP P WEXIT
08:45 - 10:00 1.25 STWHIP P WEXIT
10:00 - 12:00 2.00 FISH N DFAL WEXIT
12:00 - 13:30 1.50 FISH N DFAL WEXIT
13:30 -18:15 4.75 FISH N DFAL WEXIT
18:15 -19:45 1.50 FISH N WEXIT
19:45 - 20:00 0.25 FISH N WEXIT
20:00 - 22:30 2.50 FISH N WEXIT
22:30 - 00:00 1.50 FISH N WEXIT
11/17/2003 00:00 - 00:15 0.25 FISH N DPRB WEXIT
00:15 - 00:55 0.67 FISH N DPRB WEXIT
00:55 - 01 :30 0.58 FISH N DPRB WEXIT
01 :30 - 02:00 0.50 FISH N DPRB WEXIT
02:00 - 02:25 0.42 STWHIP N DPRB WEXIT
02:25 - 04:00 1.58 STWHIP N DPRB WEXIT
04:00 - 04: 15 0.25 STWHIP N DPRB WEXIT
04:15 - 04:30 0.25 STWHIP N DPRB WEXIT
04:30 - 06:00 1.50 STWHIP N DPRB WEXIT
06:00 - 08:50 2.83 STWHIP N DPRB WEXIT
08:50 - 11 :00 2.17 STWHIP N DPRB WEXIT
11:00-11:30 0.50 STWHIP N DPRB WEXIT
11 :30 - 17:00 5.50 STWHIP N DPRB WEXIT
17:00 - 21 :00 4.00 STWHIP N DPRB WEXIT
1.6 bpm at 3330 psi. Stall at 9495'. Mill to 9500'. Hanging at
bottom of window 9492'.
POH for crayola mill.
POH.
LD window mill. Mill in gage. PU crayola mill.
RIH. Correct to flag -5'.
Tie-in log. Zero Correction.
RIH TF 12L Stall at 9492.5' Botttom of window. No Go try
different pump rates and ROP's. No Go.
Mill @ 1.6 bpm 2860psi = FS 2930-3650 psi MW at 9493.5'.
to 9498'. Back ream thru window at +/- 90 deg and 25L Able
to drift down at min pump rate at TF:25L
Send mud down coil for fluid change over to flopro lite. Tag,
flag, gr tie in. Open ECD with mud at BHA to flush out 7" liner.
Circulate out of hole, displacing to mud.
At surface. Get off well. LD window dressing assy. Left
crayola mill and 4.3" x 1.5" section of output shaft w/ bit box in
hole.
Discuss failure with Weatherford. Discuss fishing options with
BTT. Round up fishing tools (short catch overshot with slow
speed motor). Review MWD & CTDS data. Cannot determine
exactly when motor failed.
MU fishing assembly. (short catch overshot, flex sub, bent sub,
jars, orienter, mwd package). Have trouble getting overshot
through well head.
RIH with overshot assy. Stab over fish see pressure increase.
PU see 70 psi loss at 9492 bottom of window.RIH repeat
results two more times. POH to see what we have.
POH
LD fishing BHA. No Fish. Decide to fish with slickline.
Wait on slick line.
RU Slickline. With overshot to fish bit box.
PJSM for slickline operation.
RIH with overshot fishing assembly, spiral grapple to catch
2-1/8" bit box. Latch fish Jar free with 3 licks. Gained 70 # in up
weight,
POH. FISH RECOVERED.
RD wireline.
MU BHA to drill build section, 2.6 deg motor, new HC bi-center.
RIH correct to flag.
Tie - in
RIH tag at 9498'
Come on line with pumpswith bit near bottom, stall. PU try
again, stall. PU to 9493' start rotating bit. Work down to
bottom to establish cutting pattern.
Drill ahead to 9545'. Ratty drilling. Not seeing increase in
inclination. Near bit inclination reading cased hole values.
Cement in returns, no sand. Lost the window.
Open ECD, POOH with BHA
At surface. LD BHA. Multiple broke wing cutters on bi-center
bit.
Waiting on orders
Order out MeOH to swap to e-free CT. Plans are to re-cement
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
Spud Date: 2/26/1990
End: 11/29/2003
11/11/2003
11/29/2003
N2
11/17/2003 17:00 - 21 :00 4.00 STWHIP N DPRB WEXIT
21:00-21:30 0.50 STWHIP N DPRB WEXIT
21 :30 - 00:00 2.50 STWHIP N DPRB WEXIT
11/18/2003 00:00 - 01 :30 1.50 STWHIP N DPRB WEXIT
01 :30 - 02:30 1.00 STWHIP N DPRB WEXIT
02:30 - 02:45 0.25 STWHIP N DPRB WEXIT
02:45 - 05:00 2.25 STWHIP N DPRB WEXIT
05:00 - 05:45 0.75 STWHIP N DPRB WEXIT
05:45 - 06:00 0.25 STWHIP N DPRB WEXIT
06:00 - 07:30 1.50 STWHIP N DPRB WEXIT
07:30 - 08:30 1.00 STWHIP N DPRB WEXIT
08:30 - 11 :00
2.50 STWHIP N
DPRB WEXIT
11 :00 - 14:30
3.50 STWHIP N
DPRB WEXIT
14:30 - 19:00 4.50 BOPSU P WEXIT
19:00 - 22:00 3.00 STWHIP N DPRB WEXIT
22:00 - 23:50 1.83 STWHIP N DPRB WEXIT
23:50 - 00:00 0.17 STWHIP N DPRB WEXIT
11/19/2003 00:00 - 00:10 0.17 STWHIP N DPRB WEXIT
00: 1 0 - 00:20 0.17 STWHIP N DPRB WEXIT
00:20 - 04: 10 3.83 STWHIP N DPRB WEXIT
04: 1 0 - 04:30 0.33 STWHIP N DPRB WEXIT
04:30 - 06:00 1.50 STWHIP N DPRB WEXIT
06:00 - 06:45 0.75 STWHIP N DPRB WEXIT
06:45 - 08: 15 1.50 STWHIP N DPRB WEXIT
08:15 - 08:35 0.33 STWHIP N DPRB WEXIT
08:35 - 09: 15 0.67 STWHIP N DPRB WEXIT
09:15 -18:00 8.75 STWHIP N DPRB WEXIT
18:00 - 19:40 1.67 STWHIP N DPRB WEXIT
the pilot hole and move KOP up hole.
Freeze protect coil.
Reel swap.
Continue with reel swap. Install Kendal connector pull and
pressure test.
Circulate freeze protection out of coil.
PU 2" ball drop nozzle and 1 joint of 1" CSH as a stinger, with a
disconnect above the CSH.
RIH with cementing nozzle. No problems. Set down 9,537
uncorrected (TD at 9546'). PU 5' and flag pipe.
Pump viscofied FloPro sweep 2.5 bpm at 2770 psi to carry any
fill from TD, noyhing seen at surface. Cementers rigging up.
PJSM for cement job.
Circulate 100 bbls KCI water to flush FloPro from pilot hole.
Tag bottom to displace all mud.
Begin pumping 17 ppg cement, 3.5 hrs thickening time. Pump
9.3 bbls cement, displace with water (-1.5 bbls required
cement volume). Allow cement to rise 2 bbls above nozzle
prior to PUH. POOH laying in remainder of cement, meeting
TOC (9140') with displacement at nozzle. Cement in place at
08:00. PUH to safety, drop ball, chase to nozzle with 2#
biozan.
Biozan jetting thru nozzle. RIH contaminating/jetting cement
down to 9340' CTM (9350' corrected). Jet liner clean at 2.5
bpm. POOH jetting with Bio, cleaning GLMs.
At surface. Well displaced to biozan water for milling fluid.
Most FloPro shipped to MI for storage. Swizzle stick the
BOPE. Displace CT to MeOH. Pull back and secure CT to
reel for reel swap. Plan to BOP test while swapping reels. Jeff
Jones AOGCC gave verbal approval to BOP test without
witness.
Test BOP's. Sim Ops PJSM for coil swap. Swap coil. Cement
comp str 2800 psi
LD testing tools. Center injector over hole. Pull CTE from reel
to injector. Rehead CTE. Displace MeOH from coil.
RIH w/ BHA #10
Log tie-in down from 9015' and tie-in to RA at 9030'
Fin log tie-in, corr -6'
RIH to TOC tagged at 9356'. PUH 27.3k
Drill hard cement from 9356' 1. 75/3340/160R w/ 200-400 psi
diff, 500-1500# WOB at avg 24'/hr. Drill to 9436'
Drill hard cement from 9436' 1.78/3350/35L w/ 300# diff, 1600#
WOB Drill to 9443.1' and saw CW TF shift
POOH for one step mill
Park at 3000' and PT wellbore to 2000 psi for 5 min w/ no loss.
Fin POOH
LD pilot mill/motor. MU one step mill on 2.5 deg fixed motor
RIH to 9010'
Tie - in correction -6'
RIH tag at 9442'. PU 10'. Begin kick in pump.
Time drill at 1.7 bpm at 3250 psi = FS. Drill to 9449.0' and
starting to stack wt
Mill from 9449.0' 1.75/3180/35L and see btm of window at
Printed: 121112003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/19/2003 18:00 - 19:40 1.67 STWHIP N DPRB WEXIT 9450' based on wt increase and less differential. Mill ahead
with less and less differential and more wt. Frequent PU's in
attempt to change slow penetration rate w/ no success. Get to
9453.3' w/ 9k stacked and no motor work
19:40 -21:10 1.50 STWHIP N DPRB WEXIT POOH to check BHA
21:10 - 21:55 0.75 STWHIP N DPRB WEXIT Chk motor and okay. Mill was 2.74" and had excess center
wear (1/4" hole) which was the reason for no penetration rate.
Change one step mill out for a used 2.74" (no-go) D331
21 :55 - 23:35 1.67 STWHIP N DPRB WEXIT RIH w/ BHA #12
23:35 - 23:50 0.25 STWHIP N DPRB WEXIT Log tie-in down from 9015'. Corr -6.0'
23:50 - 00:00 0.17 STWHIP N DPRB WEXIT RIH to start of HS ramp at min rate
11/20/2003 00:00 - 02:00 2.00 STWHIP N DPRB WEXIT Ream HS of ramp from 9834' at 1.85/3460/35L Motor work at
9446.9'. Got full string wt back at 9449.5' w/ incr in diff. Ream
in hole to 9450.3' and stalled. Had 7k overpull (assumed
bottom of window). Ream back down and stalled at 9448.7'.
Ream back down and stalled at 9448.5'. Ream with more
patience to 9451.0' and drills like formation
02:00 - 04:00 2.00 STWHIP N DPRB WEXIT Drill formation from 9451' 1.8/3600/35L w/ 50-200 psi diff and
1-3k at avg 13'/hr, but start stacking at 9453.5'. PU clean 31k
and stalled at 9453.5' when RIH. Ream with more patience to
9453.5', then drill ahead with the same. Call it good w/ 8' of
rathole at 9458.0'
04:00 - 05:20 1.33 STWHIP N DPRB WEXIT POOH for tapered mill
05:20 - 06:00 0.67 STWHIP N DPRB WEXIT LD rathole drilling assy. Mill was 2.73" no-go w/ wear on
gauge. MU dressing assy
06:00 - 07:40 1.67 STWHIP N DPRB WEXIT RIH w/ BHA #13
07:40 - 07:55 0.25 STWHIP N DPRB WEXIT Tie -in -7' correction.
07:55 - 10:15 2.33 STWHIP N DPRB WEXIT RIH dry tag at 9458'. PU. Pump at 1.6 bpm stall at 9455'. PU
RIH. Backream window @ 35L twice. Backream @ 260L
twice. Backream @ 60R twice.1.6 bpm 3095 psi 3010 FS. Sim
Ops change over to Flo Pro. Dry tag 9459. PU no over pull.
10: 15 - 11:40 1.42 STWHIP N DPRB WEXIT POH
11:40 - 12:35 0.92 STWHIP P WEXIT LD crayola mill. No noteworthy wear on mill. PU building drilling
assembly with 2.3 degree motor.
12:35 - 14:00 1.42 DRILL P PROD1 RIH to 9010.
14:00 - 14:25 0.42 DRILL P PROD1 Tie -in. correction -6'.
14:25 - 14:40 0.25 DRILL P PROD1 RIH tag at 9459.4'
14:40 - 19:00 4.33 DRILL P PROD1 Directionally drill. 1.7 bpm FS = 2820 psi, 3080 psi 1.9 WOB,
TF 30L, ROP 25-40',
19:00 - 23:00 4.00 DRILL P PROD1 Drill from 9660' 1.74/3080/30R to land at revised 8865' TVD at
9740', but are in a shale. Continue drilling turn and build back
to target sand 1.74/31 00/45R Drill to 9773' and not making
progress-can't get differential (should be in sand)
23:00 - 23:10 0.17 DRILL P PROD1 Wiper to window
23: 1 0 - 00:00 0.83 DRILL P PROD1 POOH for lateral assy
11/21/2003 00:00 - 00:30 0.50 DRILL P PROD1 Fin POOH for lateral assy
00:30 - 01 :25 0.92 DRILL P PROD1 Change BHA Bit was 1-1-1, but 3 nose jets were plugged. MU
lateral assy
01 :25 - 02:55 1.50 DRILL P PROD1 RIH w/ BHA #15 (1.1 deg motor)
02:55 - 03:25 0.50 DRILL P PROD1 Log tie-in down from 9010', corr -3.5'
03:25 - 03:50 0.42 DRILL P PROD1 RIH thru window, clean. Precautionary ream to TD
1.84/3120/HS tagged at 9767'
03:50 - 04:30 0.67 DRILL P PROD1 Drill from 9767' 1.85/3130/80R in shale at 84 deg
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/21/2003 04:30 - 06:50 2.33 DRILL P PROD1 Drill from 9800' 1.85/3140/5R and begin to build to get out of
shale. Continue to drill to 9922'.
06:50 - 07:20 0.50 DRILL P PROD1 Wiper to 9470' set down at 9810-20.
07:20 - 09: 15 1.92 DRILL P PROD1 Directionally drill to 10096' 1.8 bpm 2K WOB, 3380 psi. ROP
108 ECD 9.97 DH annular pressure 4586 DH coil pressure
5260 psi.
09:15 -10:05 0.83 DRILL P PROD1 Wiper over pull 20K off bottom. POH 1.8 bpm. POH to 9470 .
RIH Set down at 9830.pop thru, RIH
10:05 - 11 :25 1.33 DRILL P PROD1 Directional drill 1.8 bpm 3450 psi. WOB 2.5K ROP 120 fph,
DH annular pressure 4570 spi DH tubing pressure 5270 psi.
ECD 9.97 ppg. Stacking @ 10226. Drill to 10230.
11 :25 - 12:05 0.67 DRILL P PROD1 Wiper. Clean pick up. At 9796 over pulll10k POH to 9470. RIH
.4 bpm 1128 psi. MW at 9820.
12:05 -15:10 3.08 DRILL P PROD1 Drill PU 35K FS 3000 psi Drill at 1.8 BPM 3400 psi, 2K WOB,
ROP 140 fph, DH annular pressure 4570 psi. DH coil pressure
5250 psi. ECD 9.95 ppg. Stacking 10288'. Drill 1.8 bpm 3333
psi _5K on surface 2.5K WOB. over pull @10271 drill to 10312
stall over pulLdrill to 10338 over pull. Adding Flow lub to
improve sliding. Drill to 10,400.
15:10-16:10 1.00 DRILL P PROD1 Wiper to 9470'. Set down 3 times at 9800-20'.
16:10 -18:00 1.83 DRILL P PROD1 Directionally drilling FS 3020. 1.8 bpm 3300 psi.
18:00 - 18:30 0.50 DRILL P PROD1 Drill from 10470' 1.82/3240/80L w/ neg wt to 10494'
18:30 -19:10 0.67 DRILL P PROD1 Wiper to window-5k over pulls thru 9770-9810'
19:10 -19:45 0.58 DRILL P PROD1 Work on injector. Log down from 9000' to tie-in, add 6.5'
19:45 - 20:30 0.75 DRILL P PROD1 RIH thru window, clean. Set down at 9600' (DL change) and
work thru in 4 attempts. Set down at 9795' once. RIH to TD
tagged at 10498'
20:30 - 21 :45 1.25 DRILL P PROD1 Drill from 10498' 1.8/3200/270L w/ neg wt 60'/hr Should be
100' beyond possible fault. Drill to 10550'
21:45 - 23:10 1.42 DRILL P PROD1 Drill from 10550' 1.8/3220/270L w/ neg wt. Start new mud.
After new mud at bit drill from 10580' 1.8/2800/245L w/ pos wt.
Drill to 10607'
23:10 - 23:59 0.82 DRILL P PROD1 Wiper to window 7k overpulls from 9870-9810' w/ motor work.
RIH and clean thru 9600'
23:59 - 00:00 0.02 DRILL P WEXIT cost adjustment
11/22/2003 00:00 - 00:45 0.75 DRILL P PROD1 Continue wiper. Set down at 9825'. Work to get thru and went
thru wo pump. Ream to 9900'. Backream to 9790' w/ minor
overpulls. RIH to TD, clean
00:45 - 03:25 2.67 DRILL P PROD1 Drill from 10607' 1.8/2800/1 05R and struggle to 10685' while
stacking full wt and getting 5' drill offs. Should be making
faster hole in this 30 api sand. Assume motor is weak
03:25 - 04:05 0.67 DRILL P PROD1 Wiper to window. Minor overpulls 9800-9860'
04:05 - 05:25 1.33 DRILL P PROD1 POOH to check BHA
05:25 - 06:45 1.33 DRILL P PROD1 Bit and motor were okay, but changed out both just because
06:45 - 08:15 1.50 DRILL P PROD1 RIH
08:15 - 08:35 0.33 DRILL P PROD1 Tie -in log correction = -7'
08:35 - 10:00 1.42 DRILL P PROD1 RIH w/o pump. Thru window no problem. Continue to RIH 9500
start pumping. Set down 9580 12K over pull numerous
attempts to work thru w & w/o pump and various tool faces.
Backream 1.7 bpm and 2.9 fpm thru at TF=O. From 9630. MW
at 9585. Run thru with pump at .8 bpm OK. RIH to 9726 tight.
set down 9780. RIH 9810 - 20 no problem. Continue to RIH.
Set down 10413. PU RIH set down 10,47610,535 & 10,658.
Printed: 12/112003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/22/2003 08:35 - 10:00 1.42 DRILL P PROD1 RIH tag at 10686
10:00-11:52 1.87 DRILL P PROD1 Directionally drilling 1.8 bpm,3070 psi FS, Drill at 3200 psi .5K
WOB, -8 surface wait, Unable to drill. Backream at 235R TF
from 10680' to 10626. RIH TF 105 10630 set down. Unable to
go down hole. Back ream at 105 TF.from 10625 to 10585. RIH
set down 10597. Backream 10597 MW at 10,557 to 10,450.
RIH w/o pump set down 10457. RIH with pump set down at
10567. Back ream 10410 RIH 10459 set down no motor work
1.4 WOB . PU tp 10350 RIH full rate t01 0450 set down at
10485. 10410 -10450 ratty. Back ream 10485 to 10390. RIH
1.76 bpm set down at 10402 10597 tight Back to bottom.
11:52 -12:52 1.00 DRILL P PROD1 Dri1l1.75 bpm, 2.7K WOB . No MW. No Go. -8K at surface .9
K WOB Pump 40 bbl pill 2 additional ppb flo vis. Drilling at 1.75
bpm 3130 psi, FS 2750 psi. (after pill) WOB 2k, drilling with
-3K on surface, Drill to 10706 stackout No motor work.
12:52 - 13:50 0.97 DRILL P PROD1 Backream to window MW at 9750 -9725 OPEN EDC and
flush 7" casing. Circulate 1.6
13:50 - 16:00 2.17 DRILL N STUC PROD1 SHUT down pump while POH thru window and open EDC To
avoid damage to cement ramp and circulate 7" casing below
tailpipe. Instandly became packed off and stuck. Bit depth 9420.
Top Cement 9355'. Attempt to work pipe down with and
without pump. Notify Dan Kara. Paul Hyatt Discussed options
Continiue to work pipe to 90% and slack off. While waiting on
pass word to disconnect
16:00 - 16:44 0.73 DRILL N STUC PROD1 Send disconnect command. Still in communication with tool
resend sequence. Pull 80% No Go. Still in communication.
Close EDC and pump. Continue to Work pipe. No Go. Still in
communication. Re initiate sequence. Lost communication.
Disconnected. Pull 80% No Go. Pump down backside 1500 psi
and dump to coil twice. No Go Achieving about 700 psi
instantaneous bleed off.
16:44 - 17:30 0.77 DRILL N STUC PROD1 Pump Down backside 1500 psi dump to pits to get 1500 psi
diffferential . Still stuck.
17:30 - 18:40 1.17 DRILL N STUC PROD1 Continue to bullhead down CT at 0.3 bpm/1660 to keep CT
warm while cuss and discuss
Crew XO
18:40 - 18:50 0.17 DRILL N STUC PROD1 Safety mtg re: next step
18:50 - 19:40 0.83 DRILL N STUC PROD1 Cycle a couple times, then pull a bind. Pump max rate
2.0/3800. Try cavitating pump and no movement Stack full wt
and try it again w/ no movement Hard on pump gear end and
little noticable effect on CT. Pressure BS to 1500 psi and no
bleed off. Pump down CT at max rate and pull max wt. Dump
BS pressure and no movement Give up
19:40 - 00:00 4.33 DRILL N STUC PROD1 Discuss the future. Gather tools and make arrangements for
cutting ops. SWS eline crew is finishing up a job and with 16
hr rule they won't be available for spooling/chemical cut until
early am
11/23/2003 00:00 - 06:50 6.83 DRILL N STUC PROD1 Continue to circ (bullhead) down CT at 0.4/1900 w/ mud
keeping CT warm with occasional cycles to check if free while
wo SWS e-line personnel. SWS advised at 0030 hrs they
would arrive at 0800 hrs
After checking the CCA T data files it was found that the bit is at
9430' leaving the top of the disconnect at 9380' and the top of
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/23/2003 00:00 - 06:50 6.83 DRILL N STUC PROD1 the CTC at 9377' assuming no further movement after
disconnect The top of the cement pilot hole is at 9355'
06:50 - 08:45 1.92 FISH N STUC PROD1 Pump 20 bbls water followed by 24 bbls MeOH down CT to
leave CT FP'd to 3000'
08:45 - 09:00 0.25 FISH N STUC PROD1 PJSM with E liners
09:00 - 09:30 0.50 FISH N STUC PROD1 Pull 5k on coil. Set upper combi rams. Pull and push test Lock
rams. Strip off injector. Hot tap coil 4' above floor. (No Pressure
no fluid)
09:30 - 12:30 3.00 FISH N STUC PROD1 PJSM. Discuss potential stored energy in coil. Cut coil with
wheel cutted. strip up coil 5'+-. Install "T" clamp. Discuss
secondary methods of secure cable. Pull cable with blocks 3
60' pulls seen no indication of weak point seperating but must
have since we pulled 180 ' of cable.
12:30 - 13:00 0.50 FISH N STUC PROD1 PJSM RU to spool wireline. PU shieve in blocks.
13:00-13:15 0.25 FISH N STUC PROD1 PJSM prre jor with Nordic crew change
13:15 - 14:30 1.25 FISH N STUC PROD1 RU cable to wire unit and spool wire. Recovered entire cable
including anchor.
14:30 - 15:30 1.00 FISH N STUC PROD1 RU to make chemical cut, Similtaneous planning fishing option
with Baker Coil Fishing and Rig team. Conference with Dan
Kara.
15:30 - 16:00 0.50 FISH N STUC PROD1 Continue to prep for chemical cut
16:00 - 16:25 0.42 FISH N STUC PROD1 Well attempting to flow back. Shut in tubing. 350 psi. Attempt
to bleed off. Still flowing.
16:25 - 18:30 2.08 FISH N STUC PROD1 Bull head coil with 10 bbl H20 and Flopro. Fill CT in hole w/
mud and now on a sli vac
18:30 - 18:50 0.33 FISH N STUC PROD1 Safety mtg re: chemical cut Announce radio silence
18:50 - 21 :00 2.17 FISH N STUC PROD1 RU SWS chemical cutter. RIH w/1.375" cutter w/ mud in CT
(easier than expected)
21:00 - 22:10 1.17 FISH N STUC PROD1 Tag Kendle connector at 9377' ELMD! Cut CT w/ chemical
cutter 10' above CTC at 9367'. Good indications of cut POOH
w/ cutter to 200'
22:10 - 22:20 0.17 FISH N STUC PROD1 Safety mtg re: LD cutter
22:20 - 22:40 0.33 FISH N STUC PROD1 LD cutter, packoff assy and sheave. Lift radio silence
22:40 - 23:20 0.67 FISH N STUC PROD1 Fill CT w/ 4 bbls mud and established returns from well. RU
elevators on CT and pull test connector to 35k. Pull 30k on
connector w/ blocks. Open combis and at neutral wt. PUH 30k
10' and no overpull. RD SWS e-line tools while wait for air
bubble to migrate out of CT. Set upper combis and lock.
Remove elevators
23:20 - 00:00 0.67 FISH N STUC PROD1 PU injector. Dress reel side CT stub and intall cold roll
connector. RU rig scaffold system
11/24/2003 00:00 - 00:35 0.58 FISH N STUC PROD1 Cut off CTC on CT in hole and dress stub. Splice CT ends and
finish cold roll. RD scaffold system. Strip injector over cold
roll. Pull test grippers to 26k. Open combis and had 24k
hanging. Pull hand slips. Stab onto lub
00:35 - 02: 15 1.67 FISH N STUC PROD1 Spool cold roll onto reel. POOH w/ CT filling from BS PVT 194
MIRU DS N2
02: 15 - 02:30 0.25 FISH N STUC PROD1 At surface w/ chemical cut stub. Stab back on. SI swab
Safety mtg re: N2
02:30 - 03:30 1.00 FISH N STUC PROD1 Blow down CT w/ N2 and bleed off
03:30 - 04:45 1.25 FISH N STUC PROD1 Cut off chemical cut stub, (had clean even cut Could see wear
on outside of CT from memory). Install DS internal CTC. Pull
CT to reel and secure. Prep reel to load out
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/24/2003 04:45 - 06: 15 1.50 FISH N STUC PROD1 Open bombay doors and load out trashed CT onto Peak
lowboy. Load new (used) work reel into reel house
06:15 - 06:30 0.25 FISH N STUC PROD1 PJSM pull coil to injector.
06:30 - 07:15 0.75 FISH N STUC PROD1 Pull coil to injector install dart catcher.
07:15 - 08:00 0.75 FISH N STUC PROD1 Circulate methanol ot of coil.
08:00 - 09:45 1.75 FISH N STUC PROD1 Install kendal connector. Pull test to 30K. Pressure test to
3500 psi.
09:45 - 11 :30 1.75 FISH N STUC PROD1 Wait on orders then memory log and fishing tools.
11 :30 - 11 :45 0.25 FISH N STUC PROD1 MU nozzle.
11:45 - 14:00 2.25 FISH N STUC PROD1 RIH 1 bpm 700 psi. RIH to 9000 increase rate to 3.0 bpm at
3970 psi.
14:00 - 15:30 1.50 FISH N STUC PROD1 Tag at 9360' take weight pressure up will not wash down.
Wash 8740 to 9360 on second pass pump 20 bbl Hi Vis
pill. Circulate pill to surface Some additional sand across
screens. Have seen steady sand returns. Through out
cirulation.
15:30 - 17:00 1.50 FISH N STUC PROD1 POH.
17:00 - 18:00 1.00 FISH N STUC PROD1 LD nozzle assy. MU SWS memory GRlCCL assy
18:00 - 19:30 1.50 FISH N STUC PROD1 RIH w/ BHA#18
19:30 - 20:25 0.92 FISH N STUC PROD1 Log down from 8000' CTD at 60'/min 0.4/760 13.8k to tag at
9368' CTD
Log back up at 60'/min 0.4/600 25.8k to 8000'. Flag at 9100'
EOP
20:25 - 21:40 1.25 FISH N STUC PROD1 POOH
21:40-22:15 0.58 FISH N STUC PROD1 LD GRlCCL tools. MU BOT washover assy
22:15 - 23:50 1.58 FISH N STUC PROD1 RIH w/ BHA #19
GRlCCL data tied in to BHI and BHCS GR spike at 9028'
showed tag at 9353.5' ELMD. Flag is at 9084.9' ELMD
23:50 - 00:00 0.17 FISH N STUC PROD1 See EOP flag at 9121.0' CTD (should have been at 9126.5'
CTD or 9111.4' ELMD)-did not correct RIH
11/25/2003 00:00 - 01 :15 1.25 FISH N STUC PROD1 9300' 23.5k, 9.8k 0.2/710,0.4/960, 1.0/1400,2.0/2700,
2.55/3450
RIH and tag at 9363' at min rate. Put 500# WOB and orient 3
clicks. Orient and wash keeping string wt 10-12.5k. Get to
9368.0' and no more progress without stacking wt below 10k.
Repeat after orienting. Not seeing any pressure increase.
Assume tagged up on cement and just corkscrewing CT in 7".
PUH and chk pressures-same. RIH and tag at 9363'. Need to
try something else
01:15-02:45 1.50 FISH N STUC PROD1 POOH
02:45 - 03: 15 0.50 FISH N STUC PROD1 LD washover assy-did not get over/to fish (tattle tale pins still
intact and no other signs of tagging). MU fishing assy
03:15 - 04:45 1.50 FISH N STUC PROD1 RIH w/ BHA #20
04:45 - 04:5.0 0.08 FISH N STUC PROD1 See flag at 9146' CTD (should have been at 9149.2' CTD),
repaint Did not correct, RIH 1.2/1585
04:50 - 05: 15 0.42 FISH N STUC PROD1 Tag at 9363' and 1.2/1540 Make several tags after orients and
can't get past 9363' trying different pump rates. Apply 500#
WOB and orient around trying to get in hole, but stack out
Didn't get rough-don't want to knock off cement Need a bent
sub
05: 15 - 07:00 1.75 FISH N STUC PROD1 POOH
07:00 - 07:30 0.50 FISH N STUC PROD1 Add 3 degree bent sub to unershot BHA.
07:30 - 08:00 0.50 FISH N STUC PROD1 RIH to 1500
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/25/2003 08:00 - 08:15 0.25 FISH N STUC PROD1 POH to change BHA
08: 15 - 09:30 1.25 FISH N STUC PROD1 Wait on orders on forward plan.
09:30 - 09:45 0.25 FISH N STUC PROD1 PU BHA 21 bald cap crayola mill with orienter to locate pilot
hole and wash to fish.
09:45 - 11 :30 1.75 FISH N STUC PROD1 RIH
11 :30 - 12:45 1.25 FISH N STUC PROD1 Tag at 9368' at min rate and had pressure incr. PUH 24.5k
and orient 3 clicks and try it again w/o pump. Repeat for 360
deg. Repeat for 360 deg orienting 1-2 clicks at a time
12:45 - 14:00 1.25 FISH N STUC PROD1 Start pump at 1.7/2400 RIH and tag at 9368.2' and got motor
work which dropped to FS. RIH slow to 9369.5' and stack 1 k
wt and more motor work which wouldn't drill off. Get 2 clicks
and try again 1.75/2480 w/ same result. Repeat for 360 deg w/
same results
14:00 - 14:45 0.75 FISH N STUC PROD1 Become more aggressive. RIH w/ pump at 1.7/2400 and tag at
9368.2'. Stack 5k to 9371.7' and got faster incr in press and
went to stall pressure. Repeat. At 150 deg and after, got 400#
diff, but wouldn't stall. Started getting 5k overpulls at 210 deg.
Got 10k overpull at 300 deg
14:45 - 16:15 1.50 FISH N STUC PROD1 POOH
16:15 -17:05 0.83 FISH N STUC PROD1 LD assy. Bald cap pilot mill showed bulls-eye of being
centered in CT stub. A ring was worn at the bald/cutrite
interface
Dress washover pipe cutlip guide to be less aggressive
MU washover assy run #2
17:05 - 19:25 2.33 FISH N STUC PROD1 RIH w/ BHA #23. Unexpectedly tagged at 8650'. P/U and look
for flag made after Gr tie-in run earlier. Found and repainted.
RIH to flag corrected +456' to electronic. ?? RIH to 9200'.
Check rates/pressures 1.0/1450, 1.5/2220,2.0/2970. Upwt.
23.7 dwn wt 12.0. Continue RIH at 10'/min pumping at 1.5
bpm tagged at 9368'. Painted double yellow flag.
19:25 - 00:00 4.58 FISH N STUC PROD1 RIH and attempt to find pilothole or top of fish. Watching
pressures closely for any change. 45 minutes into wshing it
appears we are in pilothole or over fish 1 bpm/1650psi. Reduce
rate to .7 bpm to aviod hydraulically pumping off fish. Continue
to wash. Cycling orienter while on bottom. This doesn't seem to
have any benefit. Maintaining constant 23k wob and pumping
at 2bpm. Starting to see weight returns. Wash down to 9374'.
Pickup 9367' to check not getting stuck. Pipe pulls free also
400psi drop coming off fish. RIH easily to 9374' and continue
washing to 9977.1' hit hard spot sat there for 45 mins then
broke through again. Washed to 9378'.
11/26/2003 00:00 - 01 :50 1.83 FISH N STUC PROD1 Continue washing from 9378' to 9378.8'. Reduce pump to
.75bpm to reduce hydraulic effect without gains. Pushing with
10k. No gain last hour. This might be the end. Pump hi-vis pill
pull up to 9355' and sweep TOC area at 2.3bpm/4000psi work
pill to 9378.8 at reduced rate.
01 :50 - 03:50 2.00 FISH N STUC PROD1 TOH chasing pill. Repaint yellow/blue flag at 9100' EOP. Get to
surface RBIH 500' POH seen good slug of cuttings.
03:50 - 04:25 0.58 FISH N STUC PROD1 P/U Bowen Accelerator and Overshot dressed with 2 1/16" (+/-
1/16" latch) Spiral Grapple. UD washpipe, brass indicator pins
spaced at 8" intervals, shows we washed over at least 6'-8" and
no more than 7'-2" of coil (12'-3" capacity). From all indications
during washover this may be all the coil above the CTC. No
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/26/2003 03:50 - 04:25 0.58 FISH N STUC PROD1 damage seen on cutlip guide.
04:25 - 05:55 1.50 FISH N STUC PROD1 RIH to 9100' blue/yellow EOP flag. Correct +5'. RIH pumping
at 1.8bpm chck weights p/u 23.5k, dwn 11.6k reduce pump to
.6 bpm RIH tag at 9368'.
05:55 - 07: 15 1.33 FISH N STUC PROD1 Work over top of fish. Set down at 9368' and fish not biting.
24k ,11 k 0.5/1230 Orient 2 clicks and try it again and repeat.
Gained a little ground and got a bite. RBIH before losing bite
and plant the over shot. Confirm with overpulL Stack wt to
swallow to stop. Begin jarring down in increments of weight
stacking and fish not moving down. Jarred down 20 licks. Pull
10k over and jars went off-no movement
07:15 - 07:50 0.58 FISH N STUC PROD1 Begin jarring up starting w/ 40k, then working up in 5k
increments in 5 min increments to let jars cool and while
recocking at max down wt. No movement either way up to 55k.
On the next pull got to 45k and the jars went off and it looked
like we slipped off of fish. RBIH and tag at flag(s)
07:50 - 09: 15 1.42 FISH N STUC PROD1 POOH to check BHA
09:15 - 09:40 0.42 FISH N STUC PROD1 Breakdown BHA Grapple was left in hole. Overshot bowl was
cracked. Could see that CT stub had bottomed at stop.
Assume grapple disintegrated due to jarring
09:40 - 10:55 1.25 FISH N STUC PROD1 Cuss and discusslWOO
10:55-11:15 0.33 FISH N STUC PROD1 Fin LD BHA. Clear floor tools
11 :15 - 17:00 5.75 BOPSU N STUC PROD1 Weekly BOPE test while build fishing tools. Witness waived by
AOGCC. Grease crew had to service leaking swab and master
17:00 - 19:45 2.75 FISH N STUC PROD1 WO BOT mill
19:45 - 20:15 0.50 FISH N STUC PROD1 Make-up Baker Pirahha mill and motor assembly. Re-torqued
all connections.
20:15 - 22:40 2.42 FISH N STUC PROD1 RIH to 9100'. Correct to flag -2' correction. RIH up wt. 26.3k
dwn wt 12.6k dry tag at 9362'.
22:40 - 00:00 1.33 FISH N STUC PROD1 Pump 1.5bpm 2500psi motor work started at 9362'. Mill to
9364.5'
11/27/2003 00:00 - 07:25 7.42 FISH N STUC PROD1 Continue milling 2" coil from 9365' 1.5bpm 2500FS 350psi MW
600rpm's. Slow go the motor stalls easily due to size more than
anything. Pumping 10 bbl hi-vis sweeps each 2'. Getting good
metal back over shaker w/ a few fines on magnets. Milled to
9370' which is 8' of CT leaving a 2' stub above CTC. Circ 20
bbl hi vis pill. Recip 20' at TD 24.2k. See double yellow flags
at 9362.7'. Paint single white at 9300' EOP. Repaint 9100'
EOP flag
07:25 - 09: 1 0 1.75 FISH N STUC PROD1 POOH for washover assy
09: 10 - 09:55 0.75 FISH N STUC PROD1 LD milling assy. Mill showed the expected wear for cutting the
CT as planned. No signs of seeing nose stop out on CTC so
assume enough CT left to fish. MU washover assy
09:55 - 11 :30 1.58 FISH N STUC PROD1 RIH w/ BHA #26 (2-3/8 motor w/6' washpipe)
See flag at 9100' EOP at 9165.3' (should have been
9151.6')-did not correct. RIH
See flag at 9300' EOP at 9363.8' (should have been
9351.6')-did not correct. 25.5K 0.6/1400 RIH
RIH at min rate and tag at 9378'
11 :30 - 12:05 0.58 FISH N STUC PROD1 Start pump 1.8/2770 RIH 11.7k RIH slow and see sli incr in
press at 9378.0' when washpipe swallowed fish? then stalled
at 9378.3' PUH w/ 4k overpulL Red rate to lower end of motor
HP at 1.3/2110. See sli pressure incr at 9377.7'. RIH and
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/27/2003 11 :30 - 12:05 0.58 FISH N STUC PROD1 stalled at 9378.1' 2k overpull. RIH and see sli press incr at
9377.3'. Get 200# diff at 9377.5' which drilled off slow-assume
this is start of fill
12:05 - 13:20 1.25 FISH N STUC PROD1 Wash over with 50-200# diff to 9378.1' and stalled-no overpull
13:20 -15:10 1.83 FISH N STUC PROD1 Wash back down to 9378.1' and continue making progress. At
9378.8' started stacking a little wt and sli incr in differential.
Get to 9379.1' and gained 2k string wt-no change to diff. PUH
24k, clean. Check flags and all visible and on depths as noted
earlier
15:10 -16:30 1.33 FISH N STUC PROD1 POOH to check BHA
16:30 - 18:00 1.50 FISH N STUC PROD1 LD washover assy. Tattle tale pins at 0.5' and 1.5' were
sheared. Could see scars from CT stub inside washpipe.
Scars from grapple pieces on outside washpipe
Cut off CTC. PT 40k, 4000 psi. MU new MHA, jars, accel, OS
assy w/2-1/16" grapple
18:00 - 20:00 2.00 FISH N STUC PROD1 RIH correct to flag at 9300' -6' up wt 25.5k dwn wt 1.2k
0.3bpm 1055psi RIH tag 9369'.
20:00 - 21 :00 1.00 FISH N STUC PROD1 Work over fish with OS. After several attempts we're not seeing
any over pulls but we are seeing that the pump pressure will
not bleed-off quickly. Frustrating, we may have the fish which
wouldn't weigh enough to tell but the only indication that
something has changed is the pump pressure. Continue
working the OS for another hour. Either we have it or the OS
may be damaged.
21 :00 - 22:30 1.50 FISH N STUC PROD1 TOH
22:30 - 23: 1 0 0.67 FISH N RIH PROD1 Setback injector. Lift BHA in 1 piece - no fish. No damage to
OS nor any indication the fish entered it. Some ding marks on
the OS guide face. Dress up guide. P/U and surface test
orienter and include it into the BHA.
23:10 - 00:00 0.83 FISH N STUC PROD1 RIH
11/28/2003 00:00 - 00:50 0.83 FISH N STUC PROD1 RIH to flag at 9300' correct -9'. P/U wt with .5 pump at 9fpm
26k w/o pump 27.5k dwn wt 15k tag at 9368'.
00:50 - 04:30 3.67 FISH N STUC PROD1 Attempting to workover fish with OS. Trying just about every
trick in the book to get over it. Have gone around the clock
several times with the orienter. Once we seen an increase in
pressue and thought we may have at least went onto the fish.
Work pipe without picking up completely off fish for 15 min then
did pick-up but no fish. Continue working coil to the point where
we're finally nearing the limit with coil cycles over the
gooseneck.
04:30 - 06: 1 0 1.67 FISH N STUC PROD1 TOH.
06:10 - 06:40 0.50 FISH N STUC PROD1 LD BHA. Had one small fresh ding on bottom of guide, one
minor scrape just inside the bowl and none on grapple
Send washover pipe to BOT to add cut rite for dressing stub.
Assume top of stub is either slightly flared or that CT memory
has forced stub against liner wall
06:40 - 07:40 1.00 FISH P PROD1 Rig evacuation drill with inadvertent emergengy shutdown of
rig. Restart equipment. Discuss
07:40 - 09:20 1.67 FISH N STUC PROD1 WO BOT to dress wash pipe
09:20 - 10:10 0.83 FISH N STUC PROD1 MU wash over assy (same washpipe w/ 2.25" ID, but w/ cutrite
added to taper to 2.03" over 2" as fish is swallowed) to dress
top of stub. Tattle tales at 3",8", 16",28"
10:10-11:40 1.50 FISH N STUC PROD1 RIH w/ BHA #29
Printed: 12/1/2003 9:58:54 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
11/28/2003 11:40 - 13:20 1.67 FISH N STUC PROD1 9300' 26.5k, 12.1 k RIH at 0.65/1350 and tag at 9377.3' PUH,
clean. Work washover sub over stub and rolled over to 9377.4'
at 0.65/1350 Incr pump rate slowly to grind off any burrs and
see FS at 1.3/2040. Wash down slowly and see sli loss of
returns while RIH. Get 400# motor work at 9378.9' which
wouldn't drill off. PUH, clean. Resume washing down and
went by 9378.9' w/ no motor work to 9379.4' (should be top of
CTC) and stalled. PUH, clean. RIH and stall at 9379.5', repeat
and stalled at 9379.3'. That's 2.0' and should be the top of
CTC. All pickups were 10' above stub and had no motor work
going by the top
13:20 - 15:00 1.67 FISH N STUC PROD1 POOH to check BHA
15:00 -16:30 1.50 FISH N STUC PROD1 LD washover BHA First 3 tattle tales were missing. No
additional scars.
Cut off 170' CT and rehead. PT 40k, 4000 psi. Break all
connections on BHA and rethreadlock and MU BHA (overshot
w/2.0" grapple)
16:30 -18:00 1.50 FISH N STUC PROD1 RIH w/ BHA #30 tagged fish at 9377' uncorrected depth.
18:00 - 22:25 4.42 FISH N STUC PROD1 Attempting to workover fish with OS. Cycling orienter 1 click
intervals working w/wo pump on. Did this numerous times by
setting on fish with light weights and orienting and then within
the 7" and then making a run at the fish. Tryed jarring down but
jars quit working after 6 licks Oars are opened each time pump
is used). Ordered 2% KCL to displace tbg and continued
working OS and orienter with no hint of ever getting over fish.
It's been decided to halt fishing operations. PUH to tbg tail at
8740'.
22:25 - 00:00 1.58 FISH N STUC PROD1 TOH and displace tbg with 2% KCL.
11/29/2003 00:00 - 00: 15 0.25 FISH N STUC PROD1 Continue TOH while displacing tubing with 2% KCL.
00:15 - 01 :00 0.75 FISH N STUC PROD1 UD fishing tools. Checking overshot it was noticed that the fish
was swallowed 10.75" which put it exactly half way into the
grapple itself. No clues as to why the fish didn't continue into
the OS body for another 12". The grapple was not damaged
other than paint removal to the half way point There were no
scars on the face of guide as seen on previous runs but there
was 1 very shallow sharp gouge on the inside for 2-3".
M/U freeze protect stinger/nozzle assembly.
01 :00 - 03:00 2.00 RIGD P POST RIH to 2500'. Displace well with 38 bbls 60/40 methanol.
03:00 - 06:00 3.00 RIGD P POST Unstab coil from injector. Secure injector. Spoil back coil to reel
and secure. Swap reels. Same time blowdown BOP stack.
06:00 - 08:00 2.00 RIGD P POST ND BOPE
Rig Released at 0800 hrs 11/29/2003
RD events are on K-10 Daily Reports starting 11/29/2003
Printed: 12/1/2003 9:58:54 AM
e
e
02-29C
Prudhoe Bay Unit
50-029-22011-03-00
204-051
Accept:
Spud:
Release:
Ri:
PRE SIDETRACK. ABANDONMENT WORK
04/09/04
MEMORY TIE IN LOG, P&A. RIH WITH PDS, TIE IN TO SWS CBT 3-14-90 CORRECT + 8'. RIH WITH NOZZLE
& STINGER.
04/10/04
P&A, PUMP 13 BBLS 17 PPG CLASS G CEMENT. HOLD 1500 PSI FOR 30 MINUTES. GOOD PT. CLEAN OUT
TO 9170'. MAKE TWO PASSES WITH BIOZAN CHASE OUT OF HOLE AT 80%. WASH ALL MANDRELS.
FREEZE PROTECT TUBING TO 2500'. LEAVE 500 PSI ON WELLHEAD. JOB COMPLETE.
04/14/04
DRIFTED WI 2.78" CENT TO 8694' WLM. UNABLE TO GET DEEPER. DRIFT WI 2.70" CENT & S-BLR TO TOP
OF CEMENT @ 9154' WLM. BAILER EMPTY. PT TOP OF CEMENT TO #1000. TEST GOOD. BLED TUBING TO
ZERO. WELL SHUT IN ON DEPARTURE.
04/15/04
T/I/O=360/150/0. MIT OA TO 3000 PSI, PASSED (PREP FOR RWO). OA LOST 120 PSI IN 15 MIN. AND 60 PSI
IN NEXT 15 MIN. TOOK 4.1 BBLS DIESEL TO PRESSURE UP. BLED PRESSURE TO 0 PSI. FINAL
WHP=370/150/0.
04/17/04
T/I/O = 360/70/100, TEMP = SI. LNFT-IA INCOMPLETE (PRE-CTD). IA FL @ SURFACE. BLED IA FROM 70 PSI
TO 50 PSI IN 45 MINUTES - RETURNED 6.5 BBLS OF FLUID. SHUT DOWN TO PICK UP NEW SLOP TRAILER
-IN 35 MINUTES lAP INCREASED 10 PSI. BLED IA FROM 60 PSI TO 45 PSI IN 1 HOUR - RETURNED 7 BBLS
OF FLUID. MONITORED WHPS 15 MINUTES (DURING RIG-DOWN) - lAP INCREASED 5 PSI. FINAL WHPS =
360/50/120.
04/18/04
TIO= SSV/10/120. WELL SI. BLEED OA. (PRE RWO). OA FL @ SURFACE. BLED OA FROM 120 PSI TO 0 PSI
IN 5 MIN. MONITOR OAP FOR 30 MIN. NO CHANGE IN lAP. FINAL WHP'S SSV/1010.
TIO=500/300/180 LOAD I.A. WITH 9.8 BRINE. PUMPED 5 BBLS NEAT METHANOL, 410 BBLS NACL INHIBITED
BRINE, 10 BBLS DIESEL. FINAL TIO= 600/700/600.
e
e
.1_
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Start: 4/18/2004
Rig Release: 5/4/2004
Rig Number: N1
Spud Date: 2/26/1990
End: 5/4/2001
4/18/2004 02:30 - 04:30 2.00 MOB P PRE Rig released from 07-25A @ 02:30Hrs on 4/18/2004. Prep to
move rig off well. Roll up tarps & warm-up moving system.
Meanwhile rig move to DS# 07-25A is going to be derrick up as
CPS contractors have finished burrying power lines along the
rig move route.
04:30 - 08:00 3.50 MOB P PRE PJSM. Jack-up rig & pull rig off well. NU & Pltest 07-25A tree
cap. Move rig to down pad.
08:00 - 09:00 1.00 MOB P PRE PJSM. Secure BOP. P/U mats & secure pad. Conduct
post-operations pad inspection.
09:00 - 09:30 0.50 MOB P PRE PJSM. Move rig to pad entrance.
09:30 - 12:30 3.00 MOB N WAIT PRE Standby W.O. BP security & tool services personnel due to two
other ongoing rig moves.
12:30 - 13:00 0.50 MOB P PRE Held pre-move safety meeting with crew, security & tool
services.
13:00 - 16:30 3.50 MOB P PRE Move rig from DS#07 to DS#02.
16:30 - 17:00 0.50 MOB P PRE Arrive @ DS#02 & align rig in front of 02-29. Install dikes
around tree. DSM install tree platform. Conduct pre-operations
pad inspection.
17:00 - 17:15 0.25 MOB P PRE PJSM. Review procedure, hazards & mitigation for backing rig
over well.
17:15 - 17:30 0.25 MOB P PRE Back rig over well & set down.
17:30 - 18:00 0.50 RIGU P PRE ACCEPT RIG AT 17:30 HRS ON 04/18/04.
Grease Xmas tree valves.
18:00 - 18:30 0.50 RIGU PRE PJSM with night crew.
18:30 - 20:00 1.50 BOPSU PRE ND tree cap. NU BOP. While NU BOP, swap CT reel.
20:00 - 00:00 4.00 BOPSU PRE Test BOPE. Witness of test waived by Chuck Sheve. Accept
rig at 20:30 to 4/18/04. Rig accept time adjusted for RU
injector and stabbing coil. While testing BOPE, weld nubbin on
CT. MU hard line. and inner reel valve.
4/19/2004 00:00 - 02:00 2.00 BOPSU PRE Continue testing BOPE.
02:00 - 03:45 1.75 RIGU PRE RU injector. RU goose neck. MU internal CTC. Pull CT
across roof. Stab pipe in injector.
03:45 - 04:20 0.58 RIGU P PRE Weld on CTC.
04:20 - 06:00 1.67 RIGU P PRE MU dart catcher. Pump 3 bbls. PT hard line against inner reel
valve. Launch dart & pump 33bbls. CT pressure up due to
several ice plugs in CT. Also observe ice plugs in hardline &
valve to tiger tank.
06:00 - 08:00 2.00 RIGU N SFAL PRE Break hardline to tiger tank & trouble shoot ice plugs. Thaw out
ice plugs. MIU hardline, fluid pack with MeOH & P/test to
35OOpsi.
08:00 - 08:15 0.25 RIGU P PRE Open up well & record 37psi WHP. Bleed off trapped gas &
WHP drop to Opsi.
08:15 - 09:30 1.25 RIGU N SFAL PRE MIU & RIH nozzle stinger BHA# 1 to 500'. Pressure up to
4oo0psi & blowout ice plug with 4.7bbls.
09:30 - 10:15 0.75 RIGU N SFAL PRE POOH to surface.
10:15 - 10:30 0.25 RIGU P PRE Reverse PlTest inner reel valve to 3500psi - OK.
10:30 - 11 :30 1.00 RIGU P PRE Install dart catcher. Load wiper dart. Launch & chase with 2%
KCL. Dart hit @ 36.4bbls.
11 :30 - 11:45 0.25 STWHIP P WEXIT Held pre-operations safety meeting. Reviewed well plan,
potential hazards & milling BHA MIU procedures.
11:45-13:15 1.50 STWHIP P WEXIT MIU & lock lite cement milling BHA #2 with new 2.74" D331
mill, 2-318" WF 1.75deg ABH motor, Sperry GR-DIR MWD &
orienter & WF MHA (OAL = 59.69'). Scribe tools. M/U injector.
Printed: 511012004 9:22:09 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
4/19/2004
4/20/2004
From - To
13:15 - 15:00
15:00 - 15:40
15:40 - 15:45
15:45 - 15:55
20:45 - 21 :00
21:00 - 22:50
22:50 - 23:25
23:25 - 00:00
00:00 - 00:15
e
e
Page 2 _
BP EXPLORATION
OperationsSummªryReport'
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Code NPT Phase
15:55 - 16:10 0.25 STWHIP P
16:10 - 17:20 1.17 STWHIP P
17:20 - 17:25 0.08 STWHIP P
17:25 - 17:40 0.25 STWHIP P
17:40 - 18:15 0.58 STWHIP P
18:15 - 19:50 1.58 STWHIP P
19:50 - 20:45 0.92 STWHIP P
1.75 STWHIP P
WEXIT
0.67 STWHIP P
0.08 STWHIP P
0.17 STWHIP P
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
0.25 STWHIP P
1.83 STWHIP P
0.58 STWHIP P
0.58 STWHIP P
WEXIT
WEXIT
WEXIT
WEXIT
0.25 STWHIP P
WEXIT
00: 15 - 06:30 6.25 STWHIP P WEXIT
06:30 - 07:15 0.75 STWHIP P WEXIT
07:15 - 07:20 0.08 STWHIP P WEXIT
07:20 - 07:30 0.17 STWHIP P WEXIT
07:30 - 08:20 0.83 STWHIP P WEXIT
08:20 - 08:55 0.58 STWHIP P WEXIT
08:55 - 09:55 1.00 STWHIP P WEXIT
Start:
Rig Release:
Rig Number:
4/18/2004
5/4/2004
N1
Spud Date: 2/26/1990
End: 5/4/2001
Description of Operations
RIH cement milling BHA #2. SHT orienter & MWD - OK.
Continue RIH to 9015' taking FP well returns to the tiger tank.
Log down GR & tie-into TSAO @ 9022' - subtract 2' from CTD.
RIH & tag TOC @ 9171'.
OrientTF to 170R. Establish freespin @ 1.7bpm/2950psi. P/U
wt = 30k, S/O wt = 14k. PVT = 278bbls. lAP = 4psi, OAP =
95psi.
Resume pilot hole milling operations. Mill LS pilot hole to 9180'
with 170R TF, 1.7/1.7bpm, 2950/3450psi, 2-3k WOB & 70fph
ave inconsistent ROP.
Mill cement to 9235' with 165R TF, 1.7/1.7bpm, 2950/34oopsi,
3-4k WOB & 55fph ave consistent ROP.
Continue milling LS pilot hole to 9242' with 178L TF,
1.7/1.7bpm, 2950/3400psi, 2-3k WOB & 40fph ave consistent
ROP.
Orient TF to 10L for HS cement ramp.
Mill 8' cement ramp from 9242' to 9249.5' with 5-10L TF,
1.7/1.7bpm, 2950/3050psi, 2k WOB & 25fph ave consistent
ROP.
POOH. Paint 9,000' EOP flag.
LD motor and mill. Mill gaged 2.74". MU Weatherford 2.5 deg
bent housing motor wi 2.74" Hughes 1 step diamond window
mill. Check orienter. Change out pulser. Scibe MWD/motor.
MU injector.
Change packoff.
RIH to 9,000' EOP flag. Correct depth -9.2'.
Log GR tie in, +3' correction.
Orient 10L. RIH. Tag at top of cement, 9,174'. Attempt to
work through. Orient to 136R Tag. Bleed off pressure on
choke. Set down and pop through. RIH w/o pumping. RIH to
just above ramp.
Orient to 10L. RIH and tag w/o pump at 9,248'. PU to 9,238'.
Bring up pump to 1.4 bpm. Got a click. RIH and zero WOB.
Tag at 9,251.7'. Flag pipe. PU to 9,251'. Pump at 1.8 bpm,
Start time milling schedule.
Mill window following time milling schedule. Mill to 9,253.7'.
Observe pressure drop from 3400psi to 3080psi & TF rolling
right from 10L to 13R. Continue time-milling to 9,254'.
Time-mill from 9254' to 9254.7' with 13-35R TF, 1.7/3150psi,
1 k WOB & 1fph ave ROP. TF still rolling right.
P/U with 10k Olpull. PUH to 9180' & establish freespin @
1.7bpm/3080psi. Observe TF roll to 21L. P/U wt = 30k, SIO wt
= 12k.
Eased back in hole & see motor work @ 9254.2'. Bleed down
OAP from 800psi to 270psi.
Continue time-milling from 9254.2' to 9255' with 13-18R TF,
1.713120psi, 1k WOB & 1fph ave ROP. Seems like we're out.
Start milling formation by wt. Mill to 9260' with 13R TF,
1.7/1.7bpm, 3100/3130psi, 3k WOB & 5fph ave ROP. P/U with
2k O/pull. Ease back to 9257'.
Mill formation to 9265' with 13-25R TF, 1.7/1.7bpm,
3100/3420psi, 1-2k WOB & 1 Of ph ave ROP. Seeing 14degs
inclination @ 9248' . Tentative depths are: TOCPilot = 9171 "
Printed: 5/1012004 9:22:09 AM
e
Page 3"
BP EXPLORATION
Operations $u 111 mary Jqeport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 1
Date
NPT
POOH to change orienter.
Change out orienter. Check and change bit.
RIH to 900'. SHT orienter and MWD, ok. RIH and tag bottom.
Correct depth to 9347'.
Orient to 70L.
Drill from 9347' to 9392' at 1.7/1.73,100/3,350 psi, TF 60L to
80L. Slow ROP in zone 3. ROP increased at 9,370'.
Drill from 9392 to 9411' at 1.8 11.8 bpm @3360 psi. 3100 psi =
FS.
Orient 90L
Directionally drill 1.8/1.8 bpm @ 3460 psi., FS= 3160 psi., UP
WT 32K, DN WT 13K, WOB 2K, ROP 12, Based on cuttings
and comparison to last sidetrack should have higher ROP.
Decided to look at bit.
PROD1 POH
From -To
4/20/2004
08:55 - 09:55
09:55 - 10:00
10:00 - 10:10
10:10 - 11 :45
11 :45 - 13:10
1.00 STWHIP P
0.08 STWHIP P
0.17 STWHIP P
1.58 STWHIP P
1.42 STWHIP P
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
13:10 -15:15
15:15 - 17:10
2.08 STWHIP P
1.92 STWHIP P
WEXIT
WEXIT
17:10 - 17:30 0.33 STWHIP P WEXIT
17:30 - 19:15 1.75 STWHIP P WEXIT
19:15 - 20:00 0.75 DRILL P PROD1
20:00 - 21 :50 1.83 DRILL P PROD1
21 :50 - 22:55 1.08 DRILL P PROD1
22:55 - 23:05 0.17 DRILL P PROD1
23:05 - 23:20 0.25 DRILL P PROD1
23:20 - 23:40 0.33 DRILL P PROD1
23:40 - 00:00 0.33 DRILL P PROD1
4/21/2004 00:00 - 04:40 4.67 DRILL P PROD1
04:40 - 06:00 1.33 DRILL P PROD1
06:00 - 06:20 0.33 DRILL P PROD1
06:20 - 08:10 1.83 DRILL P PROD1
08:10 - 10:00 1.83 DRILL P PROD1
10:00 - 11 :30 1.50 DRILL N
11 :30 - 12:10 0.67 DRILL N
12:10 - 13:50 1.67 DRILL N
13:50 - 14:00 PROD1
14:00 - 18:20 PROD1
18:20 - 20:15 P PROD1
P PROD1
P PROD1
0.67 DRILL P
Start: 4/18/2004
Rig Release: 5/4/2004
Rig Number: N1
Spud Date: 2/26/1990
End: 5/4/2001
TOCRamp = 9242', TOW = 9250' & BOW = 9255'.
PUH to 9015' for GR tie-in.
Log down GR & tie-into TSAD @ 9022' - add l' to CTD.
Paint EOP flag @ 9000' & POOH window milling BHA.
LD motor and mill. Change out MWD. PU 2.74" diamond
crayola mill, 1.75 degree BH motor.
RIH. Correct depth to flag, -8'. Tie in wi GR, -1'.
Orient to 14R. Ream window. Stall at 9247.4'. Ream down
between 3R and 8R wi TF rolling to 25R. Weight dropped off
at 9252.2. RIH and tag at 9262.5'. Back ream window at 14R
at 1.5 fpm to 9240'. Pump 30 bbl high visco pill. RIH and tag.
Orient to 45R. Back ream window to 9245' and PU to 9240'.
Slow pump to minimum rate and drift window smoothly. Tag
bottom and orient to 45L. Back ream window. Slow pump to
minimum rate and drift smoothly. Shut down pump and pull
through the window. Run back through the window w/o a
bobble.
Start pumping new flo pro. Displace well bore.
POOH.
LD dressing mill (in gauge) and MU 1.7 Xtreme.
RIH to 9035
Tie - in (correction -2')
RIH ta at 9267'
Directionally drill at 1.8 /1.8 bpm at 3370 psi. FS = 3000 psi,
ROP 50 fph, TF 75 L. Drill to 9279.
Orient to 40L
Directionally drill at 1.8/1.8 bpm at 3160 psi. FS
ROP 29 fph, TF 105 L. Drill to 9300'.
Directionally drill 1.8 /1.8 bpm @ 3350 .3000 psi FS, Up
weight 32K, SO weight 16K, 2K W , ROP 10 fph,drill to
9335. Tool face irradic most Ii formation change top of
zone 3. ROP slowing.
POH.
Change out bit. . graded 4-2-BT-T-X-NA-RO-PR.
RIH. Tag mat 9,343'. Correct depth to 9,336'.
Orient OL. Drill from 9,336' to 9,347'. Orienter is not
wo g. Tag bottom. Pull into 7" and cycle orienter, no clicks.
Printed: 5/1012004 9:22:09 AM
,..
ObP
e
BP-GDB
Baker Hughes INTEQ Survey Report
.
Bíí.
BA_
......
h~TEQ
or'
Company: BP Amoco Date: 1/15/2004 Time: 10:09:00 Page: 1
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: 02-29A, True North
Site: PB DS 02 Vertical (TVD) Reference: 57: 29 1/22/199000:0063.0
Well: 02-29A Section (VS) Reference: Well (0.00N,0.00E,350.00Azi)
Wellpath: 02-29B Survey Calculation Method: Minimum Curvature Db: Oracle
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea level Geomagnetic Model: bggm2003
Site: PB DS 02
TR-11-14
UNITED STATES: North Slope
Site Position: Northing: 5948800.37 ft Latitude: 70 15 53.847 N
From: Map Easting: 687638.44 ft Longitude: 148 28 58.060 W
Position Uncertainty: 0.00 ft North Reference: True
Ground Level: 0.00 ft Grid Convergence: 1.43 deg
Well: 02-29A Slot Name: 29
02-29A
Well Position: +N/-S 1514.17 ft Northing: 5950336.13 ft Latitude: 70 16 8.739 N
+E/-W 888.73 ft Easting : 688489.10 ft Longitude: 148 28 32.190 W
Position Uncertainty: 0.00 ft
Wellpath: 02-29B Drilled From: 02-29A
500292200202 Tie-on Depth: 9444.70 ft
Current Datum: 57 : 29 1/22/1990 00:00 Height 63.00 ft Above System Datum: Mean Sea Level
Magnetic Data: 11/24/2003 Declination: 25.56 deg
Field Strength: 57586 nT Mag Dip Angle: 80.86 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
33.00 0.00 0.00 350.00
Survey Program for Definitive Wellpath
Date: 1/15/2004 Validated: Yes Version: 6
Actual From To Survey Toolcode Tool Name
ft ft
34.40 9426.40 1 : Schlumberger GCT multishot (34.40-104~ Schlumberger GCT multishot
9444.70 10707.00 MWD (9444.70-10707.00) MWD+SAG MWD + Sag correction
Annotation
MD TVD >
ft ft ...... .
9426.40 8721.94 TIP
9444.70 8739.91 KOP
10707.00 8873.34 TD
Survey: MWD Start Date: 11/22/2003
Company: Baker Hughes INTEQ Engineer:
Tool: MWD+SAG,MWD + Sag correction Tied-to: From: Definitive Path
Survey
MD Incl Azim TVD SSTVD . N/S EIW MapN MapE VS DLS
ft deg deg ft ft ft ft > ft ft ft degl100ft
9426.40 11.02 69.56 8721.94 8658.94 850.26 3186.96 5951265.88 691653.58 283.94 0.00
9444.70 10.97 69.41 8739.91 8676.91 851.49 3190.23 5951267.18 691656.82 284.57 0.31
9450.00 12.31 65.13 8745.10 8682.10 851.90 3191.22 5951267.62 691657.79 284.81 30.06
9480.31 22.51 36.05 8774.03 8711.03 857.98 3197.59 5951273.85 691664.01 289.69 43.28
9510.81 28.64 17.87 8801.57 8738.57 869.69 3203.28 5951285.70 691669.41 300.23 32.45
9541.55 33.85 6.90 8827.87 8764.87 885.22 3206.58 5951301.31 691672.32 314.95 25.04
9573.04 40.89 357.26 8852.90 8789.90 904.26 3207.14 5951320.36 691672.40 333.61 29.01
9610.68 52.72 346.83 8878.65 8815.65 931.28 3203.12 5951347.27 691667.70 360.92 37.28
9642.22 60.27 345.12 8896.05 8833.05 956.77 3196.73 5951372.59 691660.68 387.13 24.36
9672.66 70.22 348.40 8908.79 8845.79 983.65 3190.44 5951399.30 691653.72 414.69 34.11
9703.10 76.81 354.55 8917.43 8854.43 1012.49 3186.15 5951428.02 691648.71 443.84 29.04
/
ObP
e
BP-GDB
Baker Hughes INTEQ Survey Report
e
BiíI.
IIIAJœR
HUGIll.
lNTEQ
Company: BP Amoco Date: 1/15/2004 Time: 10:09:00 Page: 2
Field: Prudhoe Bay Co-ordinate(NE} Reference: Well: 02-29A, True Nòrth
Site: PB DS 02 Vertical (fVD) Reference: 57: 29 1/22/199000:0063.0
Well: 02-29A Section (VS) Reference: Well (0.00N,0.00E,350.00Azi)
Wellpath: 02-29B Survey Calculation Method: Minimum Curvature Db: Oracle
Survey
MD Incl Azim TVD SSTVD N/S EIW MapN MapE VS DLS
ft deg deg ft ft ft ft ft ft ft deg/100ft
9736.22 80.07 1.61 8924.07 8861.07 1044.89 3185.07 5951460.38 691646.82 475.94 23.08
9766.35 84.26 359.20 8928.18 8865.18 1074.73 3185.28 5951490.22 691646.28 505.29 16.00
9795.29 90.28 356.44 8929.56 8866.56 1103.60 3184.18 5951519.05 691644.46 533.91 22.88
9827.30 98.14 5.14 8927.20 8864.20 1135.47 3184.61 5951550.91 691644.09 565.22 36.56
9862.21 97.14 11.84 8922.56 8859.56 1169.67 3189.71 5951585.23 691648.34 598.01 19.24
9894.16 95.44 14.43 8919.06 8856.06 1200.59 3196.93 5951616.32 691654.78 627.21 9.66
9930.82 93.35 20.65 8916.24 8853.24 1235.42 3207.94 5951651.42 691664.91 659.60 17.85
9961.78 93.87 26.97 8914.29 8851.29 1263.68 3220.41 5951679.97 691676.67 685.26 20.44
10003.83 93.10 32.06 8911.74 8848.74 1300.19 3241.08 5951716.99 691696.42 717.63 12.22
10033.01 93.78 28.37 8909.98 8846.98 1325.36 3255.74 5951742.51 691710.44 739.87 12.84
10065.96 92.24 26.69 8908.25 8845.25 1354.53 3270.95 5951772.06 691724.91 765.96 6.91
10099.09 91.72 20.20 8907.11 8844.11 1384.89 3284.11 5951802.74 691737.31 793.57 19.64
10141.07 93.72 15.37 8905.11 8842.11 1424.81 3296.92 5951842.96 691749.11 830.66 12.44
10172.64 94.33 13.50 8902.90 8839.90 1455.30 3304.77 5951873.64 691756.19 859.33 6.22
10204.71 94.64 13.72 8900.39 8837.39 1486.38 3312.29 5951904.89 691762.93 888.62 1.18
10234.21 95.78 9.90 8897.71 8834.71 1515.13 3318.30 5951933.78 691768.22 915.89 13.46
10264.21 94.98 4.81 8894.90 8831.90 1544.74 3322.12 5951963.48 691771.30 944.39 17.10
10296.05 95.53 358.86 8891.98 8828.98 1576.41 3323.14 5951995.17 691771.53 975.41 18.69
10332.30 96.06 353.21 8888.31 8825.31 1612.38 3320.65 5952031.05 691768.13 1011.26 15.58
10361.77 97.04 349.00 8884.95 8821.95 1641.30 3316.12 5952059.85 691762.89 1040.52 14.58
10394.11 95.57 345.98 8881 .40 8818.40 1672.67 3309.16 5952091.04 691755.14 1072.63 10.33
10426.07 92.60 340.45 8879.12 8816.12 1703.18 3299.96 5952121.30 691745.18 1104.27 19.60
10461.41 89.17 336.90 8878.58 8815.58 1736.08 3287.11 5952153.87 691731.51 1138.91 13.97
10490.17 89.75 331.08 8878.85 8815.85 1761.92 3274.50 5952179.38 691718.26 1166.54 20.34
10520.75 92.97 328.31 8878.12 8815.12 1788.31 3259.08 5952205.37 691702.18 1195.20 13.89
10549.95 92.58 324.94 8876.71 8813.71 1812.66 3243.04 5952229.32 691685.54 1221.97 11.60
10579.95 91.69 321.84 8875.59 8812.59 1836.72 3225.16 5952252.92 691667.07 1248.77 10.74
10612.66 90.58 323.35 8874.94 8811.94 1862.70 3205.30 5952278.39 691646.56 1277.80 5.73
10639.64 90.74 326.12 8874.63 8811.63 1884.72 3189.72 5952300.02 691630.44 1302.20 10.28
10671.05 91.20 329.83 8874.10 8811.10 1911.34 3173.07 5952326.21 691613.13 1331.31 11.90
10707.00 91.20 329.83 8873.34 8810.34 1942.42 3155.01 5952356.82 691594.29 1365.05 0.00
1/15/2004
WeHpath: (02-29A102-29B)
Dale
Azimuths to True North
Magnetic North: 25.56'
Magnetic Field
Strength: 57586nT
Dip Angle: 80.86'
Date: 1112412003
Model: bggm2003
M
T
2500
900
800
2400
2300
2200
2100
~2000
it:
e 1900
e
""
"'"'1800
-
+
::ë'1700
1':
01600
Z
~500
.....,
,g::
'!; 1400
o
CI) 1300
200
00
1000
BP Amoco
WELLPATH DETAILS
02-298
500292200202
Parent Wellpath: 02-29A
Tie an MD: 9444.70
Rig: Nordic 2
Ref. Datum: 57: 29 1/2211990 00:00 63.0011
V.Section Origin Origin Starting
Angle +Nf·S +E/-W From !VD
350.00' 0,00 33.00
REFERENCE
Co-ordinate (NIE) Reference: Well Centre. 02-29A, True North
Vertical (TVD Reference: srcstem: Mean Sea level
Section (VS) Reference: Sot - 29 (O.OON,O,OOE)
Measured Depth Reference: 57: 29 1/22/199000:00 63.00
Calculation Method: Minimum CUlvature
ANNOTATIONS
TVO MD
8658.94 9426.41
8676.91 9444.71
2100 2200 2300 2400 2500 2600 2700 2800 2900 3000 3100 3200 3300
West( -)/East( '*")
· STATE OF ALASKA .
ALASKA 0 ND GAS CONSERVATION COM SION
APPLICATION FOR SUNDRY APPROVAL
20 MC 25.280
\l-i01r "'>/iCflz.C.7Ði.f
f) 7f 3/ /9/4-
1. Type of Request:
IS! Abandon o Suspend o Operation Shutdown o Perforate o Waiver o Other
o Alter Casing o Repair Well o Plug Perforations o Stimulate o Time Extension
o Change Approved Program o Pull Tubing o Perforate New Pool o Re-Enter Suspended Well o Annular Disposal
2. Operator Name: 4. Current Well Class: 5. Permit T~iII Number
BP Exploration (Alaska) Inc. a Development D Exploratory 203-146
3. Address: D Stratigraphic Test D Service 6. API Number: f
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22011-02-00
7. KB Elevation (ft): KBE = 63' 9. Well Name and Number: PBU 02-29B"/
8. Property Designation: 10. Field 1 Pool(s):
ADL 028308 Prudhoe Bay Field 1 Prudhoe Bay Pool
:t1. WI-II i,
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
10707 8873 10707 8873 NIA 9375
<'> i" .::C.' > i..!VI~ .iii ii I.i, «Vi" ·isii¡aílîrsti'¡:\ iX r'i :i<
Structural
tnr 112' 20" 112' 112' 1530 520
Surface 3923' 13-3/8" 3923' 3704' 3450 1950
IntArmAcii;:¡tA 9099' 9-5/8" 9099' 8401' 6870 4760
P i n
I inAr 1108' 7" 8683' - 9443' 7993' - 8738' 8160 7020
Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: I Tubing MD (ft):
None None 4-1/2" x 3-1/2" L-80 8740'
Packers and SSSV Type: 9-5/8" x 3-1/2" Baker 'D' packer; Packers and SSSV MD (ft): 8636'
4-1/2" AVA TRSV 2239'
12. Attachments: 13. Well Class after proposed work:
a Description Summary of Proposal a BOP Sketch D Exploratory a Development D Service
D Detailed Operations Program
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: April 8, 2004 DOil DGas D Plugged a Abandoned
16. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Thomas McCarty, 564-4378
Printed Name Thomas McCarty Title CT Drilling Engineer
;'~ú '3/¡Ø/(Jt.( Prepared By Name/Number.
SiQnaturë7 ¿;::::;;": - - Phone 564-4378 Date Terrie Hubble, 564-4628
~
i<yi ii.: h<. : Ti,:' i¡S~i "'·ZL""'" <i i( iI i,ii::i' 'ii'iLii;
I Sundry Number: .3 0 If - () Z5" 2-'
Conditions of approval: Notify Commission so that a representative may witness
D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance
Other: Y'" J\il{ I g -Wit) 4
Subseque~"'l
Approved . iJ /j,~Á BY ORDER OF ð~/'lrðLf
COMMISSIONER THE COMMISSION Date
Form 10-403 ~se &~3 "'-. -h ! Submit In Duplicate
O·
, .
. i '\ ..
"\ L
\
~!.ik.~." . ....j ~ taì~L
\_f\\lr-~)~~ ge-
.. 2 1004
.
.
To: Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Thomas M. McCarty
CTD Engineer
Date: March 17, 2004
Re: P&A operations for we1l2-29C in prep for a CTD sidetrack
We1l2-29B is scheduled for a through tubing sidetrack with the SLB/Nordic 1 Coiled Tubing Drillin~g. The
sidetrack, 2-29C, will exit.QH{.efthe existing 7" liner from a ce~nt ramp and target Zone 1 reserves. The
existing open hole will be abandoned with 17ppg cement plug. The following describes work planned for the
P&A and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is
attached for reference.
t
Pre CTD Summary
1) Slickline -Drift tubing. Dummy gas lift valves. Pressure test IA to 2500 psi.
2) CTU- Pump 17ppg Cement plug '2 '7.;. I:) b l Ç. ~t W6fr
Tk <" ID -q.:J'~ ""f>PY\'I/&\..( .
CTD Sidetrack Summary
1) MIRU CTD rig.
2) Mill 2.74" aD window at approx 9250' md off cement ramp
3) Drill 3" OR sidetrack to -11150' TD with MWD/gamma ray.
4) Run memory CNL/CCL/GR in OR
5) Run 2-3/8" liner completion. Top of liner will be at approx 8684' md in 3 Yz" tubing
6) Cement liner with 12 Bbls of 15.8 ppg cement.
7) Perforate.
8) RDMO.
The pre CTD work may begin as early as April 15, 2004.
Thomas McCarty
CTD Drilling Engineer
564-4378, 748-2598
CC: Well File
Sondra StewmanfTerrie Hubble
lREE= OWGEN4 SA S: REDRlLL NOT SIDETRACKED, 9-5/8"
WElLI-EA 0 = OW 02-298 CSGLEAKLDL 06/22/03, OA DOWNSQZ'D 07/31/03
ACTUATOR - AXELSON *OPEN HOLE= 9443' -1070T W/OLNR*
KB. ELBI - 62'
SF. ELBI = NA
KOP- 900' 2239' 4-112" A VA TRSV ,10 = 3.813" I
Max Angle = 29 @ 3600' ¿ . ,,;
D3tum rvo = 9570'
D3tum 1V D = 8800' SS ---t 3011' 4-112" X 3-112" XO 1
113-3/8" CSG, 68#, K-55, 10 = 12.415" 104' /' - -
v GAS UFT MANI:RELS
14-112" IFe TBG, 12.6#, L-80, BTC MOD, 3011' ST rvo TVO DEV TYÆ VLV LA TCH PORT D<\ TE
tJ 1 3361 3211 27 MM3 RK -
.0152 bpf, ID= 3.958" 2 4564 4265 29 MM3 RK -
~ ~
113-318" CSG, 68#, L-80, 10 = 12.415" 3923' 3 5669 5254 26 MM3 RK -
4 6802 6277 26 MM3 RK -
5 7137 6579 26 MM3 RK -
6 7723 7103 27 MM3 RK -
ILEAK IN 9-5/8" '6345' I 7 8057 7403 24 MM3 RKP -
CI-EMCAL MANI:RELS
I ST rvo TVO DEV TYPE VLV I LATCH 1 PORTI D<\TE
c L I 8 18548178621 16 1 MM3LTSRI OOM: 1 RK I - 105/14190
Minimum ID = 2.992" @ 8740' J ~ I 8633' 3-112" BAKER LOCSEAL ASSY I
3-1/2" TUBING t.--,.
= "I 8636' 9-51[5' X 3-112" BAKER MODEL 0 PKR I
8655' 3-112" BAKER IIIILLOUTEXT, D = 6.00" I
I I 8683' TOP OF 7" LNR BAKER HYDRO II HGR
I I 8727' 3-112" 011S XN NIP, MILLED TO 10 = 2.80" I
I I H I
8739' 3-112" BAKERSI-EAR OUT SUB
13-112" TBG, 9.3#, L-80, .0087 bpf, 10 = 2.992"
8740' 8740' 3-112"TBG TAIL WlWLffi 1
"'"'1
19-5/8" CSG, 47#, L-80, 10 = 8.681" 9099' .4 ~ I 8719' H ELMO TT LOGGED 04126/90 I
TOP OF OIAT At-D STARr OF 2.74" 9355' ~
PILOlHOLE FORCMf RAM' EXIT J(
TOP OF 2" COIL FISH - BHÞ. 52' X 2.70" Mð.X 00 9375' )( \
I )( I I
WINOOW 9443' - 9450'
PERFORATION SU\1Mð. RY
REF LOG: SWS ŒT ON 03/13190
ANGLEATTOPPERF: 11 @9631'
/lbte: Refer to A'oductbn IE for historical perf data ~"'~
SIZE SFF INTERVAL OpnlSqz DATE
2-1/8" 4 9631 - 9646 S ffiOFOSED
2-5/8" 4 9664 - 9668 S ffiOFOSEO
2-5/8" 4 9671 - 9682 S ffiOFOSED
I ffiTO 9680' \ I OÆN H:JLE
I I
17" LNR, 29#, L-80, BTC. .0371 bpf, 10 = 6.184" 9791' I
I TO 10486'
1[5' erc EXT CSG A<R 9556' I
110 10707' I
DATE REV BY COM\1ENfS D<\ TE RBI BY COM\18'JTS ffiLOHOE BA Y UI\IT
02126190 ORIGINAL COMPLETION WELL: 02-298
10107103 TM IflLP SUSPEtÐED CTO SIŒTRACK PERMIT No: 2031460
AA No: 50-029-22011-01
Sa:; 36, T11 N, R14E, 161.22' FEL & 5259' FNL
BP Exploration (Alaska)
TREE =
WELLHEAD =
ACTUATOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum lVD =
CrN GEN 4
CrN
AXELSON
62'
02-29C
.
SAFETY NOTES: RB>DRlLL NOT
SIDETRACKED. 9 5/8" CSG LK LDL
6/22/03, OA DOWNSQZD 7/31/03
.
Proposed CTD Sidetrack
2239'
-14-1/2" AVA TRSV,ID=3.813" I
13-3/8" CSG, 68#,
K-55,ID= 12.415"
104'
.
4-1/2" IPC TBG, 12.6#, L-80,
BTC MOD, 0.0152 bpf, ID =
3.958"
PORT DATE
3011'
113-3/8" CSG, 68#, L-80, ID = 12.415" I
I LEAK IN 9 5/8" H 6345'
~
-13-1/2" BAKER LOG SEAL ASSY I
9-5/8" X 3-1/2" BAKER MODEL D PKR
3-1/2" BAKER MILLOUT EXT 1D=6"
I Top of 2-3/8" Liner
TOPOF 7" LNR BAKER HYDRO II HNGR I 8683'
13-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" I
8740'
8727
8739'
8740'
8719'
-13-1/2" OTIS XN NIP, mìlled to 10 = 2.80" I
3-1/2" BAKER SHEAR OUT SUB
3-1/2" TUBING TAIL W/WLEG
H ELMO TT LOGGED 04/26/90 I
19-5/8" CSG, 47#, L-80, ID = 8.681" I 8999'
TOp of Cement H 9075'
10ld Cement top I
-lTOP of P&A / KO cement plug
-1 Cement Ramp Liner Exit
PERFORATION SUMMARY
REF LOG: SWS CET ON 03/13/90
ANGLE AT TOP PERF: 11 @ 9631'
Note: Refer to A"oduction DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/8" 4 9631-9646 sqzd proposed
2-5/8" 4 9664-9668 sqzd proposed
2-5/8" 4 9671-9682 sqzd proposed
I
H 8" CTC EXTERNAL CSG PKR I
I PBTD H 9680'
T' LNR, 29#, L-80, BTC, 0.0371 bpf, ID=6.184" 9791'
DATE
02126/90
01/02101
02114/01
02/02102
10/07/03
~ 10486'
REV BY COMMENTS
ORIGINAL COMPLETION
SIS-SLT CONVERTED TO CANVAS
SIS-MD FINAL
RNITP CORRECTIONS
MSE A"oposed CTD sidetrack
DATE
PRUDHOE BAY UNIT
WELL: 02-298
ÆRMITNo: 203-146
API No: 50-029-22011-01
SEG 36 T11 N R14E 161.22 FEL 5259 FNL
BP Exploration (Alaska)
REV BY
COMMENTS
STATE OF ALASKA
ALASKA. AND GAS CONSERVATION CO,_SSION
REPORT OF SUNDRY WELL OPŒ:RATIONS
1. Operations Performed:
o Abandon
o Alter Casing
o ChanQe Approved ProQram
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
o Suspend
o Repair Well
o Pull TubinQ
KBE = 63'
8. Property Designation:
ADL 028308
11. Present well condition summary
Total depth: measured
Effective depth:
true vertical
measured
true vertical
10707
8873
10707
8873
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
112'
3923'
9099'
1108'
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size (size, grade, and measured depth):
181 Operation Shutdown 0 Perforate
o Plug Perforations 0 Stimulate
o Perforate New Pool 0 Re-Enter Suspended Well
4. Current Well Class:
a Development 0 Exploratol)
o Stratigraphic Test 0 Service
99519-6612
o Waiver
o Time Extension
o Annular Disposal
5. Permit To Drill Number
203-146
6. API Number:
50-029-22011-02-00
o Other
9. Well Name and Number:
PBU 02-29B
10. Field / Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
feet
feet Plugs (measured) N/A
feet Junk (measured) 9375
feet
Size MD TVD Burst
20" 112' 112' 1530
13-3/8" 3923' 3704' 3450
9-5/8" 9099' 8401' 6870
7" 8683' - 9443' 7993' - 8738' 8160
Collapse
520
1950
4760
7020
None
None
4-1/2" x 3-1/2"
L-80
8740'
Packers and SSSV (type and measured depth): 9-5/8" x 3-1/2" Baker 'D' packer;
4-1/2" AVA TRSV
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
8636'
EIVeo
JAN 1 6 2004
Alaska Oil & Gas Cons. Commission
Anchorage
Treatment description including volumes used and final pressure:
13.
Oil-Bbl
Prior to well operation:
Subsequent to operation:
14. Attachments:
a Copies of Logs and Surveys run
a Daily Report of Well Operations
a Well Schematic Diagram
Re resentative Dail
Gas-Met Water-Bbl
Tubin Pressure
15. Well Class after proposed work:
o Exploratory a Development 0 Service
16. Well Status after proposed work:
a Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL
est 0 my nowe ge. Sundry Number or N/A if C.O. Exempt:
303-386
17. I hereby certl
Contact
Printed Name Terrie Hubble
Signature
Form 10-404 Revised 12/2003
Title Technical Assistant
Date Ol ;'5/0
Prepared By Name/Number:
Terrie Hubble, 564-4628
JA~ ~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Page 10f 13
Operations Summary Report
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Date From- To Hours Task Code NPT Phase
11/11/2003 11:45 -17:00
17:00 - 23:00
23:00 - 00:00
11/12/2003 00:00 - 04:00
04:00 - 09:00
09:00 - 12:00
12:00 -15:00
15:00 - 16:00
16:00 - 17:00
17:00 - 19:10
19:10 - 19:50
19:50 - 20:45
20:45 - 21 :30
21 :30 - 22:00
22:00 - 00:00
11/13/2003 00:00 - 01 :30
01 :30 - 03:00
03:00 - 04:30
04:30 - 04:45
04:45 - 07:00
07:00 - 09:00
09:00 - 11 :45
11 :45 - 12:30
12:30 - 13:30
13:30 - 13:45
13:45 - 14:15
14:15 -18:00
18:00 -18:15
18:15 - 22:00
22:00 - 23:30
23:30 - 00:00
11/14/2003 00:00 - 00:15
00:15 - 02:00
5.25 MOB P
6.00 MOB P
1.00 BOPSU
4.00 RIGU
5.00 BOPSU P
3.00 SìWHIP P
3.00 SìWHIP P
1.00 SìWHIP P
1.00 SìWHIP P
2.17 SìWHIP P
0.67 SìWHIP P
0.92 SìWHIP P
0.75 SìWHIP N
0.50 SìWHIP P
2.00 SìWHIP N
1.50 CLEAN N
1.50 CLEAN N
1.50 CLEAN N
0.25 CLEAN N
2.25 CLEAN N
2.00 CLEAN N
2.75 CLEAN N
0.75 CLEAN N
1.00 ZONISO N
0.25 ZONISO N
0.50 ZONISO N
3.75 ZONISO N
0.25 ZONISO N
3.75 ZONISO N
1.50 ZONISO N
0.50 ZONISO N
0.25 ZONISO N
1.75 ZONISO N
PRE
PRE
PRE
PRE
PRE
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
WEXIT
CEMT WEXIT
WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
Move rig from DS 7 to DS 2. Escorted by security and CPS.
Raise derrick. Scope derrick.Move rig camp and spot same.
Inspect pad & tree. Move rig over well.
NU BOP
NU BOPS, kill & choke lines. Spot return & cuttings tanks.
Run and test hardline. Install modified goose neck on injector.
Prep pipe shed. Load tools. Spot Tech Limit, MWD & MI
shack.
Test BOPs. Witness waived by J. Jones AOGCC. PU 2"
e-line reel.
Pu injector and install packoff. Stab coil in injector. MU E-line
patch cord in reel.
Install coil connector and head up with E- line. PT coil
connector
stab on to well and circulate MEOH out of coil.
Pick up pilot hole milling BHA.
RIH to tie in at 9000'.
Tie-in correction -22'.
Tag at 9438' . FS 2520 psi at 1.8 bpm. Drill cement 1.8 bpm
90 + ROP to Gas allarm divert thru gas buster seeing some
crude in returns. Cleaned up continue to drill to 9459' Decision
point per program. Drill rate indicates poor cement. WOB
varing and motor work varing.
Call Dan Kara reviewed options. Agreed to have DD evaluate
option of lower KO. DD advised that target could be met with
40/100 build. This lower KO 6'. Agreed to drill to 9482.
Drill to 94821.8 bpm 3180 psi 80+ ROP WOB 0-.4K.
Notified Dan Kara. Agreed to POH for underreemer.WiII under
ream to 9550'. POH.
POH to surface.
Set back injector. LD mill and 1.75 motor mill in-gauge. PU
under reamer and straight motor. PU injector and stab onto
well.
RIH to 9020
Tie in correction -17.4'.
RIH to 9425. Unreaming at 1.5 bpm at FS = 2220 psi. MW at
9450
Continue undereaming at 9508'. Hard cement below here.
Ream to 9515'. Circulate bio sweep around.
Open EDC. Circulate out of hole
At surface. Get off well. LD BHA. Undereamer blades showed
good wear pattern.
Displace e-line reel to meoh.
Pressure test well bore to 2000 psi. Held solid.
Hold PJSM before beginning reel swap.
Ustab pipe from injector. Spool onto reel and secure same.
Drop reel onto trailer.
PJSM for reel swap with new crew.
Swap reel. Cut off internal grapple. Pull coil to injector. Stab in
Pump dart. Pump 1-3/8" ball.
MU Cementing nozzle
MU Cement nozzle.
RIH with cementing assy. Tag at 9518' uncorrected. PU ten
Printed: 12/112003 9:58:54 AM
Page 2 of 13
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Date
From -To Hours Task Code NPT Phase
,
11/14/2003 00:15-02:00
02:00 - 02:45
02:45 - 03:00
03:00 - 04:40
1.75 ZONISO N
0.75 ZONISO N
0.25 ZONISO N
1.67 ZONISO N
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
CEMT WEXIT
04:40 - 05:10 0.50 ZONISO N CEMT WEXIT
05:10 - 08:00 2.83 ZONISO N CEMT WEXIT
08:00 - 09:30 1.50 ZONISO N CEMT WEXIT
09:30 - 11 :30 2.00 ZONISO N CEMT WEXIT
11:30 -12:00 0.50 ZONISO N CEMT WEXIT
12:00 - 12:30 0.50 STWHIP N CEMT WEXIT
12:30 - 15:30 3.00 STWHIP N CEMT WEXIT
15:30 - 18:00 2.50 STWHIP N CEMT WEXIT
18:00 - 19:30 1.50 STWHIP N CEMT WEXIT
19:30 - 20:00 0.50 STWHIP N CEMT WEXIT
20:00 - 20:15 0.25 STWHIP N CEMT WEXIT
20:15 - 21:45 1.50 STWHIP N CEMT WEXIT
21 :45 - 22:00 0.25 STWHIP N CEMT WEXIT
22:00 - 22:10 0.17 STWHIP N CEMT WEXIT
22:10 - 00:00 1.83 STWHIP P WEXIT
11/1512003 00:00 - 02:20 2.33 STWHIP P WEXIT
02:20 - 02:40 0.33 STWHIP P WEXIT
02:40 - 04:30 1.83 STWHIP P WEXIT
04:30 - 05:15 0.75 STWHIP P WEXIT
05:15 - 07:30 2.25 STWHIP P WEXIT
07:30 - 08:00 0.50 STWHIP P WEXIT
08:00 - 09:00 1.00 STWHIP P WEXIT
09:00 - 12:45 3.75 STWHIP P WEXIT
12:45 - 15:00 2.25 STWHIP P WEXIT
15:00 - 18:00 3.00 STWHIP P WEXIT
18:00 - 22:45 4.75 STWHIP P WEXIT
,
Start: 11/11/2003
Rig Release: 11/29/2003
Rig Number: N2
Spud Date: 2/26/1990
End: 11/29/2003
Description of Operations
and flag pipe.
RU cementers.
PJSM for cement job.
Prime up and test lines .RIH to flag 23 k up and 12 k dn. Pump
50 bbl KCL.@ 2.2bpm 3500 psi. Tag TD to flush bio water
from rat hole. Pick up to flag continue pumping balance of 50
bbl KCL followed by 2 bbl fresh H20. 13 bbl17ppg cement,
Displace with 50 bbl KCL. Displace cement to nozzle +4 bbl .
POH at 52 ftImin pumping 2 bpm.TOC 9177. PU to 9000'
Wait on cement.
RIH to 9385 containiating cement 2bpm at 26 ftImin. POH
chasing cement to surface. Wash each GLM while POOH.
Get off well. MU swirt nozzle. Get on well and jet out BOP
stack to remove any cement.
Hold PJSM to dicuss reel swap with crew. Unstab coil. Secure
to reel..
Drop 2" coil on to Peak trailer.
PU 2" e-line coil.
Attach stabbing line to coil. Unsecure coil from reel. Pull coil
across top of pips shed. Work down through injector.
MU Kendal coil connector and pull test. MU hard line inside
reel.
Circulate out methanol from E coil. Circulate to warm coil.
PT connector to 3500 psi.
MU pilot milling assembly
RIH to 9030'
Tie-in correction -22'.
RIH dry tag at 9388
Drill 1.8 bpm . FS=3000 psi. UP wt 26K, DN wt 14K. Drill
cement at 3300 psi 1.5 WOB 1.8 bpm 14-27 ROP. Drill
cement to 9425
Drilling cement to 9477'. FS = 3300 psi. Drill at 1.8 bpm. 3600
psi 1.5k WOB ROP 23'. TF 145R
Drill ramp to 9485. TF 35L. 1.8 bpm, 3600 psi. ROP 32 fph.
WOB 1.2K.
POH.
Change out BHA.
RIH. Having a problem with pilot pressure control. Call
mechanics.
Tie into EOP flag at 8900'. -20' correction. RIH to 9020. Log
gr tie in. 0' correction.
Replace pilot pressure control in ops cab. Test same.
RIH to btm of pilot hole. Tag at 9485'. PU 10' and begin
pumping at 1.6 bpm/3000 psi. RIH. Tag up. Flag pipe. PU 1'.
Begin time milling as per well plan schedule at TF:35L. WOB:
0.1K#
Back to flag at 9485'. 3060 psi @ 1.59 bpm. 0.0# WOB.
TF:35L. Continue milling as per schedule.
Milling at 9486.0. 0.0# WOB. Metal on magnets. Start taking
weight at 9488'. Mill to 9489'.
Mill to 9492 1.6 bpm 3250 psi. Can't get drill off. Can't get at
stall. Acts like hanging in window. Backream thru window see
motor work at top of window. Ream back to bottom 4.6K WOB
Printed: 12/112003 9:58:54 AM
Page 3 of 13
Operations Summary Report
Legal Well Name: 02-29
Common Well Name: 02-29 Spud Date: 2/26/1990
Event Name: REENTER+COMPLETE Start: 11/11/2003 End: 11/29/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/29/2003
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
11/1512003 18:00 - 22:45 4.75 STWHIP P WEXIT 1.6 bpm at 3330 psi. Stall at 9495'. Mill to 9500'. Hanging at
bottom of window 9492'.
22:45 - 00:00 1.25 STWHIP P WEXIT POH for crayola mill.
11/1612003 00:00 - 00:30 0.50 STWHIP P WEXIT POH.
00:30 - 01 :30 1.00 STWHIP P WEXIT LD window mill. Mill in gage. PU crayola mill.
01 :30 - 03:15 1.75 STWHIP P WEXIT RIH. Correct to flag _5'.
03:15 - 03:30 0.25 STWHIP P WEXIT Tie-in log. Zero Correction.
03:30 - 03:40 0.17 STWHIP P WEXIT RIH TF 12L. Stall at 9492.5' Botttom of window. No Go try
different pump rates and ROP's. No Go.
03:40 - 06:15 2.58 STWHIP P WEXIT Mill @ 1.6 bpm 2860psi = FS 2930-3650 psi MW at 9493.5'.
to 9498'. Back ream thru window at +/- 90 deg and 25L. Able
to drift down at min pump rate at TF:25L.
06:15 - 07:30 1.25 STWHIP P WEXIT Send mud down coil for fluid change over to flopro lite. Tag,
flag, gr tie in. Open ECD with mud at BHA to flush out 7" liner.
07:30 - 08:45 1.25 STWHIP P WEXIT Circulate out of hole, displacing to mud.
08:45 - 10:00 1.25 STWHIP P WEXIT At surface. Get off well. LD window dressing assy. Left
crayola mill and 4.3" x 1.5" section of output shaft w/ bit box in
hole.
10:00 - 12:00 2.00 FISH N DFAL WEXIT Discuss failure with Weatherford. Discuss fishing options with
BTT. Round up fishing tools (short catch overshot with slow
speed motor). Review MWD & CTDS data. Cannot determine
exactly when motor failed.
12:00 - 13:30 1.50 FISH N DFAL WEXIT MU fishing assembly. (short catch overshot, flex sub, bent sub,
jars, orienter, mwd package). Have trouble getting overshot
through well head.
13:30 - 18:15 4.75 FISH N DFAL WEXIT RIH with overshot assy. Stab over fish see pressure increase.
PU see 70 psi loss at 9492 bottom of window.RIH repeat
results two more times. POH to see what we have.
18:15 - 19:45 1.50 FISH N WEXIT POH
19:45 - 20:00 0.25 FISH N WEXIT LD fishing BHA. No Fish. Decide to fish with slickline.
20:00 - 22:30 2.50 FISH N WEXIT Wait on slick line.
22:30 - 00:00 1.50 FISH N WEXIT RU Slickline. With overshot to fish bit box.
11/1712003 00:00 - 00:15 0.25 FISH N DPRB WEXIT PJSM for slickline operation.
00:15 - 00:55 0.67 FISH N DPRB WEXIT RIH with overshot fishing assembly, spiral grapple to catch
2-1/8" bit box. Latch fish Jar free with 3 licks. Gained 70 # in up
weight,
00:55 - 01 :30 0.58 FISH N DPRB WEXIT POH. FISH RECOVERED.
01 :30 - 02:00 0.50 FISH N DPRB WEXIT RD wireline.
02:00 - 02:25 0.42 STWHIP N DPRB WEXIT MU BHA to drill build section, 2.6 deg motor, new HC bi-center.
02:25 - 04:00 1.58 STWHIP N DPRB WEXIT RIH correct to flag.
04:00 - 04:15 0.25 STWHIP N DPRB WEXIT Tie - in
04:15 - 04:30 0.25 STWHIP N DPRB WEXIT RIH tag at 9498'
04:30 - 06:00 1.50 STWHIP N DPRB WEXIT Come on line with pumpswith bit near bottom, stall. PU try
again, stall. PU to 9493' start rotating bit. Work down to
bottom to establish cutting pattern.
06:00 - 08:50 2.83 STWHIP N DPRB WEXIT Drill ahead to 9545'. Ratty drilling. Not seeing increase in
inclination. Near bit inclination reading cased hole values.
Cement in returns, no sand. Lost the window.
08:50 - 11 :00 2.17 STWHIP N DPRB WEXIT Open ECD, POOH with BHA
11:00-11:30 0.50 STWHIP N DPRB WEXIT At surface. LD BHA. Multiple broke wing cutters on bi-center
bit.
11 :30 - 17:00 5.50 STWHIP N DPRB WEXIT Waiting on orders
17:00 - 21:00 4.00 STWHIP N DPRB WEXIT Order out MeOH to swap to e-free CT. Plans are to re-cement
Printed: 12/112003 9:58:54/W1
Page 4 of13
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
Date From... To Hours Task Code NPT Phase Description of Operations
11/17/2003 17:00 - 21 :00 4.00 STWHIP N DPRB WEXIT the pilot hole and move KOP up hole.
21 :00 - 21 :30 0.50 STWHIP N DPRB WEXIT Freeze protect coil.
21 :30 - 00:00 2.50 STWHIP N DPRB WEXIT Reel swap.
11/18/2003 00:00 - 01 :30 1.50 STWHIP N DPRB WEXIT Continue with reel swap. Install Kendal connector pull and
pressure test
01 :30 - 02:30 1.00 STWHIP N DPRB WEXIT Circulate freeze protection out of coil.
02:30 - 02:45 0.25 STWHIP N DPRB WEXIT PU 2" ball drop nozzle and 1 joint of 1" CSH as a stinger, with a
disconnect above the CSH.
02:45 - 05:00 2.25 STWHIP N DPRB WEXIT RIH with cementing nozzle. No problems. Set down 9,537
uncorrected (TD at 9546'). PU 5' and flag pipe.
05:00 - 05:45 0.75 STWHIP N DPRB WEXIT Pump viscofied FloPro sweep 2.5 bpm at 2770 psi to carry any
fill from TD, noyhing seen at surface. Cementers rigging up.
05:45 - 06:00 0.25 STWHIP N DPRB WEXIT PJSM for cement job.
06:00 - 07:30 1.50 STWHIP N DPRB WEXIT Circulate 100 bbls KCI water to flush FloPro from pilot hole.
Tag bottom to displace all mud.
07:30 - 08:30 1.00 STWHIP N DPRB WEXIT Begin pumping 17 ppg cement, 3.5 hrs thickening time. Pump
9.3 bbls cement, displace with water (-1.5 bbls required
cement volume). Allow cement to rise 2 bbls above nozzle
prior to PUH. POOH laying in remainder of cement, meeting
TOC (9140') with displacement at nozzle. Cement in place at
08:00. PUH to safety, drop ball, chase to nozzle with 2#
biozan.
08:30 - 11 :00 2.50 STWHIP N DPRB WEXIT Biozan jetting thru nozzle. RIH contaminating/jetting cement
down to 9340' CTM (9350' corrected). Jet liner clean at 2.5
bpm. POOH jetting with Bio, cleaning GLMs.
11 :00 - 14:30 3.50 STWHIP N DPRB WEXIT At surface. Well displaced to biozan water for milling fluid.
Most FloPro shipped to MI for storage. Swizzle stick the
BOPE. Displace CT to MeOH. Pull back and secure CT to
reel for reel swap. Plan to BOP test while swapping reels. Jeff
Jones AOGCC gave verbal approval to BOP test without
witness.
14:30 - 19:00 4.50 BOPSU P WEXIT Test BOP's. Sim Ops PJSM for coil swap. Swap coil. Cement
comp str 2800 psi
19:00 - 22:00 3.00 STWHIP N DPRB WEXIT LD testing tools. Center injector over hole. Pull CTE from reel
to injector. Rehead CTE. Displace MeOH from coil.
22:00 - 23:50 1.83 STWHIP N DPRB WEXIT RIH w/ BHA #10
23:50 - 00:00 0.17 STWHIP N DPRB WEXIT Log tie-in down from 9015' and tie-in to RA at 9030'
11/19/2003 00:00 - 00:10 0.17 STWHIP N DPRB WEXIT Fin log tie-in, corr -6'
00: 1 0 - 00:20 0.17 STWHIP N DPRB WEXIT RIH to TOC tagged at 9356'. PUH 27.3k
00:20 - 04:10 3.83 STWHIP N DPRB WEXIT Drill hard cement from 9356' 1.75/3340/160R wi 200-400 psi
diff, 500-1500# WOB at avg 24'/hr. Drill to 9436'
04:10 - 04:30 0.33 STWHIP N DPRB WEXIT Drill hard cement from 9436' 1.78/3350/35L w/ 300# diff, 1600#
WOB Drill to 9443.1' and saw CW TF shift
04:30 - 06:00 1.50 STWHIP N DPRB WEXIT POOH for one step mill
Park at 3000' and PT wellbore to 2000 psi for 5 min wi no loss.
Fin POOH
06:00 - 06:45 0.75 STWHIP N DPRB WEXIT LD pilot mill/motor. MU one step mill on 2.5 deg fixed motor
06:45 - 08:15 1.50 STWHIP N DPRB WEXIT RIH to 9010'
08:15 - 08:35 0.33 STWHIP N DPRB WEXIT Tie - in correction-6'
08:35 - 09:15 0.67 STWHIP N DPRB WEXIT RIH tag at 9442'. PU 10'. Begin kick in pump.
09:15 - 18:00 8.75 STWHIP N DPRB WEXIT Time drill at 1.7 bpm at 3250 psi = FS. Drill to 9449.0' and
starting to stack wt
18:00 - 19:40 1.67 STWHIP N DPRB WEXIT Mill from 9449.0' 1.7513180135L and see btm of window at
Printed: 12/112003 9:58:54 AM
Page 5 of 13
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
Date From.- To Hours Task Code NPT Phase Descriptionof,Operations
11/19/2003 18:00 - 19:40 1.67 STWHIP N DPRB WEXIT 9450' based on wt increase and less differential. Mill ahead
with less and less differential and more wt. Frequent PU's in
attempt to change slow penetration rate w/ no success. Get to
9453.3' w/ 9k stacked and no motor work
19:40 - 21:10 1.50 STWHIP N DPRB WEXIT POOH to check BHA
21:10-21:55 0.75 STWHIP N DPRB WEXIT Chk motor and okay. Mill was 2.74" and had excess center
wear (1/4" hole) which was the reason for no penetration rate.
Change one step mill out for a used 2.74" (no-go) D331
21 :55 - 23:35 1.67 STWHIP N DPRB WEXIT RIH w/ BHA #12
23:35 - 23:50 0.25 STWHIP N DPRB WEXIT Log tie-in down from 9015'. Corr -6.0'
23:50 - 00:00 0.17 STWHIP N DPRB WEXIT RIH to start of HS ramp at min rate
11/20/2003 00:00 - 02:00 2.00 STWHIP N DPRB WEXIT Ream HS of ramp from 9834' at 1.85/3460/35L. Motor work at
9446.9'. Got full string wt back at 9449.5' w/ incr in diff. Ream
in hole to 9450.3' and stalled. Had 7k overpull (assumed
bottom of window). Ream back down and stalled at 9448.7'.
Ream back down and stalled at 9448.5'. Ream with more
patience to 9451.0' and drills like formation
02:00 - 04:00 2.00 STWHIP N DPRB WEXIT Drill formation from 9451' 1.8/3600135L w/50-200 psi diff and
1-3k at avg 13'/hr, but start stacking at 9453.5'. PU clean 31k
and stalled at 9453.5' when RIH. Ream with more patience to
9453.5', then drill ahead with the same. Call it good w/ 8' of
rathole at 9458.0'
04:00 - 05:20 1.33 STWHIP N DPRB WEXIT POOH for tapered mill
05:20 - 06:00 0.67 STWHIP N DPRB WEXIT LD rathole drilling assy. Mill was 2.73" no-go w/ wear on
gauge. MU dressing assy
06:00 - 07:40 1.67 STWHIP N DPRB WEXIT RIH w/ BHA #13
07:40 - 07:55 0.25 STWHIP N DPRB WEXIT Tie -in -7' correction.
07:55-10:15 2.33 STWHIP N DPRB WEXIT RIH dry tag at 9458'. PU. Pump at 1.6 bpm stall at 9455'. PU
RIH. Backream window @ 35L twice. Backream @ 260L
twice. Backream @ 60R twice.1.6 bpm 3095 psi 3010 FS. Sim
Ops change over to Flo Pro. Dry tag 9459. PU no over pull.
10:15 - 11 :40 1.42 STWHIP N DPRB WEXIT POH
11:40 -12:35 0.92 STWHIP P WEXIT LD crayola mill. No noteworthy wear on mill. PU building drilling
assembly with 2.3 degree motor.
12:35 - 14:00 1.42 DRILL P PROD1 RIH to 9010.
14:00 - 14:25 0.42 DRILL P PROD1 Tie -in. correction -6'.
14:25 - 14:40 0.25 DRILL P PROD1 RIH tag at 9459.4'
14:40 - 19:00 4.33 DRILL P PROD1 Directionally drill. 1.7 bpm FS = 2820 psi, 3080 psi 1.9 WOB,
TF 30L, ROP 25-40',
19:00 - 23:00 4.00 DRILL P PROD1 Drill from 9660' 1.7 4/3080/30R to land at revised 8865' TVD at
9740', but are in a shale. Continue drilling turn and build back
to target sand 1.7413100/45R Drill to 9773' and not making
progress-can't get differential (should be in sand)
23:00 - 23:10 0.17 DRILL P PROD1 Wiper to window
23:10 - 00:00 0.83 DRILL P PROD1 POOH for lateral assy
11/21/2003 00:00 - 00:30 0.50 DRILL P PROD1 Fin POOH for lateral assy
00:30 - 01 :25 0.92 DRILL P PROD1 Change BHA. Bit was 1-1-1, but 3 nose jets were plugged. MU
lateral assy
01 :25 - 02:55 1.50 DRILL P PROD1 RIH w/ BHA #15 (1.1 deg motor)
02:55 - 03:25 0.50 DRILL P PROD1 Log tie-in down from 9010', corr -3.5'
03:25 - 03:50 0.42 DRILL P PROD1 RIH thru window, clean. Precautionary ream to TD
1.84/3120/HS tagged at 9767'
03:50 - 04:30 0.67 DRILL P PROD1 Drill from 9767' 1.85/3130/80R in shale at 84 deg
Printed: 121112003 9:58:54 AM
Page 60f 1.3
Operations Sum.mary Report
Legal Well Name: 02-29
Common Well Name: 02-29 Spud Date: 2/26/1990
Event Name: REENTER+COMPLETE Start: 11/11/2003 End: 11/29/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/29/2003
Rig Name: NORDIC 2 Rig Number: N2
Date From- To Hours Task Code NPT Phase Description of Operations
11/21/2003 04:30 - 06:50 2.33 DRILL P PROD1 Drill from 9800' 1.85/3140/5R and begin to build to get out of
shale. Continue to drill to 9922'.
06:50 - 07:20 0.50 DRILL P PROD1 Wiper to 9470' set down at 9810-20.
07:20 - 09:15 1.92 DRILL P PROD1 Directionally drill to 10096' 1.8 bpm 2K WOB, 3380 psi. ROP
108 ECD 9.97 DH annular pressure 4586 DH coil pressure
5260 psi.
09:15 -10:05 0.83 DRILL P PROD1 Wiper over pull 20K off bottom. POH 1.8 bpm. POH to 9470 .
RIH Set down at 9830.pop thru, RIH
10:05 - 11 :25 1.33 DRILL P PROD1 Directional drill 1.8 bpm 3450 psi. WOB 2.5K ROP 120 fph,
DH annular pressure 4570 spi DH tubing pressure 5270 psi.
ECD 9.97 ppg. Stacking @ 10226. Drill to 10230.
11:25-12:05 0.67 DRILL P PROD1 Wiper. Clean pick up. At 9796 over pulll10k POH to 9470. RIH
.4 bpm 1128 psi. MW at 9820.
12:05 - 15:10 3.08 DRILL P PROD1 Drill PU 35K FS 3000 psi Drill at 1.8 BPM 3400 psi, 2K WOB,
ROP 140 fph, DH annular pressure 4570 psi. DH coil pressure
5250 psi. ECD 9.95 ppg. Stacking 10288'. Drill 1.8 bpm 3333
psi _5K on surface 2.5K WOB. over pull @10271 drill to 10312
stall over pull.drill to 10338 over pull. Adding Flow lub to
improve sliding. Drill to 10,400.
15:10 - 16:10 1.00 DRILL P PROD1 Wiper to 9470'. Set down 3 times at 9800-20'.
16:10 - 18:00 1.83 DRILL P PROD1 Directionally drilling FS 3020. 1.8 bpm 3300 psi.
18:00 - 18:30 0.50 DRILL P PROD1 Drill from 10470' 1.82/3240/80L w/ neg wt to 10494'
18:30 - 19:10 0.67 DRILL P PROD1 Wiper to window-5k over pulls thru 9770-9810'
19:10 - 19:45 0.58 DRILL P PROD1 Work on injector. Log down from 9000' to tie-in, add 6.5'
19:45 - 20:30 0.75 DRILL P PROD1 RIH thru window, clean. Set down at 9600' (DL change) and
work thru in 4 attempts. Set down at 9795' once. RIH to TD
tagged at 10498'
20:30 - 21 :45 1.25 DRILL P PROD1 Drill from 10498' 1.8/3200/270L w/ neg wt 60'/hr Should be
100' beyond possible fault Drill to 10550'
21 :45 - 23:10 1.42 DRILL P PROD1 Drill from 10550' 1.8/3220/270L w/ neg wt. Start new mud.
After new mud at bit drill from 10580' 1.8/2800/245L w/ pos wt.
Drill to 10607'
23:10 - 23:59 0.82 DRILL P PROD1 Wiper to window 7k overpulls from 9870-9810' w/ motor work.
RIH and clean thru 9600'
23:59 - 00:00 0.02 DRILL P WEXIT cost adjustment
11/22/2003 00:00 - 00:45 0.75 DRILL P PROD1 Continue wiper. Set down at 9825'. Work to get thru and went
thru wo pump. Ream to 9900'. Backream to 9790' w/ minor
overpulls. RIH to TD, clean
00:45 - 03:25 2.67 DRILL P PROD1 Drill from 10607' 1.8/2800/1 05R and struggle to 10685' while
stacking full wt and getting 5' drill offs. Should be making
faster hole in this 30 api sand. Assume motor is weak
03:25 - 04:05 0.67 DRILL P PROD1 Wiper to window. Minor overpulls 9800-9860'
04:05 - 05:25 1.33 DRILL P PROD1 POOH to check BHA
05:25 - 06:45 1.33 DRILL P PROD1 Bit and motor were okay, but changed out both just because
06:45 - 08:15 1.50 DRILL P PROD1 RIH
08:15 - 08:35 0.33 DRILL P PROD1 Tie -in log correction =-7'
08:35 - 10:00 1.42 DRILL P PROD1 RIH w/o pump. Thru window no problem. Continue to RIH 9500
start pumping. Set down 9580 12K over pull numerous
attempts to work thru w & w/o pump and various tool faces.
Backream 1.7 bpm and 2.9 fpm thru at TF=O. From 9630. MW
at 9585. Run thru with pump at .8 bpm OK. RIH to 9726 tight
set down 9780. RIH 9810 - 20 no problem. Continue to RIH.
Set down 10413. PU RIH set down 10,47610,535 & 10,658.
Printed: 12/1/2003 9:58:54 AM
Page 7 of 13
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
Date From -To Hours Task Code NPT Phase Description of Operations
11/22/2003 08:35 - 10:00 1.42 DRILL P PROD1 RIH tag at 10686
10:00 -11:52 1.87 DRILL P PROD1 Directionally drilling 1.8 bpm,3070 psi FS, Drill at 3200 psi .5K
WOB, -8 surface wait, Unable to drill. Backream at 235R TF
from 10680' to 10626. RIH TF 105 10630 set down. Unable to
go down hole. Back ream at 105 TFJrom 10625 to 10585. RIH
set down 10597. Backream 10597 MW at 10,557 to 10,450.
RIH wlo pump set down 10457. RIH with pump set down at
10567. Back ream 10410 RIH 10459 set down no motor work
1.4 WOB .PU tp 10350 RIH full rate to10450 set down at
10485. 10410 -10450 ratty. Back ream 10485 to 10390. RIH
1.76 bpm set down at 10402 10597 tight Back to bottom.
11:52 -12:52 1.00 DRILL P PROD1 Dri1l1.75 bpm, 2.7K WOB . No MW. No Go. -8K at surface .9
K WOB Pump 40 bbl pill 2 additional ppb flo vis. Drilling at 1.75
bpm 3130 psi, FS 2750 psi. (after pill) WOB 2k, drilling with
-3K on surface, Drill to 10706 stackout. No motor work.
12:52 - 13:50 0.97 DRILL P PROD1 Backream to window MW at 9750 -9725 OPEN EDC and
flush 7" casing. Circulate 1.6
13:50 - 16:00 2.17 DRILL N STUC PROD1 SHUT down pump while POH thru window and open EDC To
avoid damage to cement ramp and circulate 7" casing below
tailpipe. Instandly became packedoff and stuck. Bit depth 9420.
Top Cement 9355'. Attempt to work pipe down with and
without pump. Notify Dan Kara. Paul Hyatt. Discussed options
Continiue to work pipe to 90% and slack off. While waiting on
pass word to disconnect.
16:00 - 16:44 0.73 DRILL N STUC PROD1 Send disconnect command. Still in communication with tool
resend sequence. Pull 80% No Go. Still in communication.
Close EDC and pump. Continue to Work pipe. No Go. Still in
communication. Re initiate sequence. lost communication.
Disconnected. Pull 80% No Go. Pump down backside 1500 psi
and dump to coil twice. No Go Achieving about 700 psi
instantaneous bleed off.
16:44 - 17:30 0.77 DRILL N STUC PROD1 Pump Down backside 1500 psi dump to pits to get 1500 psi
diffferential . Still stuck.
17:30 - 18:40 1.17 DRILL N STUC PROD1 Continue to bullhead down CT at 0.3 bpm/1660 to keep CT
warm while cuss and discuss
Crew XO
18:40 - 18:50 0.17 DRILL N STUC PROD1 Safety mtg re: next step
18:50 - 19:40 0.83 DRILL N STUC PROD1 Cycle a couple times, then pull a bind. Pump max rate
2.0/3800. Try cavitating pump and no movement. Stack full wt
and try it again w/ no movement. Hard on pump gear end and
little noticable effect on CT. Pressure BS to 1500 psi and no
bleed off. Pump down CT at max rate and pull max wt. Dump
BS pressure and no movement. Give up
19:40 - 00:00 4.33 DRILL N STUC PROD1 Discuss the future. Gather tools and make arrangements for
cutting ops. SWS eline crew is finishing up a job and with 16
hr rule they won't be available for spooling/chemical cut until
early am
11/23/2003 00:00 - 06:50 6.83 DRill N STUC PROD1 Continue to circ (bullhead) down CT at 0.4/1900 w/ mud
keeping CT warm with occasional cycles to check if free while
wo SWS e-line personnel. SWS advised at 0030 hrs they
would arrive at 0800 hrs
After checking the CCA T data files it was found that the bit is at
9430' leaving the top of the disconnect at 9380' and the top of
Printed: 12/112003 9:58:54 AM
Page 8 of 13
Operations Summary Repod
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
Date From-To Hours Task Code NPT Phase Description of Operations
11/23/2003 00:00 - 06:50 6.83 DRILL N STUC PROD1 the CTC at 9377' assuming no further movement after
disconnect. The top of the cement pilot hole is at 9355'
06:50 - 08:45 1.92 FISH N STUC PROD1 Pump 20 bbls water followed by 24 bbls MeOH down CT to
leave CT FP'd to 3000'
08:45 - 09:00 0.25 FISH N STUC PROD1 PJSM with E liners
09:00 - 09:30 0.50 FISH N STUC PROD1 Pull 5k on coil. Set upper combi rams. Pull and push test. Lock
rams. Strip off injector. Hot tap coil 4' above floor. (No Pressure
no fluid)
09:30 - 12:30 3.00 FISH N STUC PROD1 PJSM. Discuss potential stored energy in coil. Cut coil with
wheel cutted. strip up coil 5'+-. Install "T" clamp. Discuss
secondary methods of secure cable. Pull cable with blocks 3
60' pulls seen no indication of weak point seperating but must
have since we pulled 180 ' of cable.
12:30 - 13:00 0.50 FISH N STUC PROD1 PJSM RU to spool wireline. PU shieve in blocks.
13:00 - 13:15 0.25 FISH N STUC PROD1 PJSM prre jor with Nordic crew change
13:15 - 14:30 1.25 FISH N STUC PROD1 RU cable to wire unit and spool wire. Recovered entire cable
including anchor.
14:30 -15:30 1.00 FISH N STUC PROD1 RU to make chemical cut, Similtaneous planning fishing option
with Baker Coil Fishing and Rig team. Conference with Dan
Kara.
15:30 - 16:00 0.50 FISH N STUC PROD1 Continue to prep for chemical cut.
16:00 - 16:25 0.42 FISH N STUC PROD1 Well attempting to flow back. Shut in tubing. 350 psi. Attempt
to bleed off. Still flowing .
16:25 - 18:30 2.08 FISH N STUC PROD1 Bull head coil with 10 bbl H20 and Flopro. Fill CT in hole w/
mud and now on a sli vac
18:30 -18:50 0.33 FISH N STUC PROD1 Safety mtg re: chemical cut. Announce radio silence
18:50 - 21:00 2.17 FISH N STUC PROD1 RU SWS chemical cutter. RIH w/1.375" cutter w/ mud in CT
(easier than expected)
21:00 - 22:10 1.17 FISH N STUC PROD1 Tag Kendle connector at 9377' ELMD! Cut CT w/ chemical
cutter 10' above CTC at 9367'. Good indications of cut. POOH
w/ cutter to 200'
22: 1 0 - 22:20 0.17 FISH N STUC PROD1 Safety mtg re: LD cutter
22:20 - 22:40 0.33 FISH N STUC PROD1 LD cutter, packoff assy and sheave. Lift radio silence
22:40 - 23:20 0.67 FISH N STUC PROD1 Fill CT w/ 4 bbls mud and established retums from well. RU
elevators on CT and pull test connector to 35k. Pull 30k on
connector w/ blocks. Open combis and at neutral wt. PUH 30k
10' and no overpull. RD SWS e-line tools while wait for air
bubble to migrate out of CT. Set upper combis and lock.
Remove elevators
23:20 - 00:00 0.67 FISH N STUC PROD1 PU injector. Dress reel side CT stub and intall cold roll
connector. RU rig scaffold system
11/24/2003 00:00 - 00:35 0.58 FISH N STUC PROD1 Cut off CTC on CT in hole and dress stub. Splice CT ends and
finish cold roll. RD scaffold system. Strip injector over cold
roll. Pull test grippers to 26k. Open combis and had 24k
hanging. Pull hand slips. Stab onto lub
00:35 - 02:15 1.67 FISH N STUC PROD1 Spool cold roll onto reel. POOH w/ CT filling from BS PVT 194
MIRU DS N2
02:15 - 02:30 0.25 FISH N STUC PROD1 At surface w/ chemical cut stub. Stab back on. SI swab
Safety mtg re: N2
02:30 - 03:30 1.00 FISH N STUC PROD1 Blow down CT w/ N2 and bleed off
03:30 - 04:45 1.25 FISH N STUC PROD1 Cut off chemical cut stub, (had clean even cut. Could see wear
on outside of CT from memory). Install DS internal CTC. Pull
CT to reel and secure. Prep reel to load out
Printed: 12/112003 9:58:54 AM
Page 90f 13
Operations Summary Report
Legal Well Name: 02-29
Common Well Name: 02-29 Spud Date: 2/26/1990
Event Name: REENTER+COMPLETE Start: 11/11/2003 End: 11/29/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/29/2003
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description ofOperatipns
11/24/2003 04:45 - 06:15 1.50 FISH N STUC PROD1 Open bombay doors and load out trashed CT onto Peak
lowboy. Load new (used) work reel into reel house
06:15 - 06:30 0.25 FISH N STUC PROD1 PJSM pull coil to injector.
06:30 - 07:15 0.75 FISH N STUC PROD1 Pull coil to injector install dart catcher.
07:15 - 08:00 0.75 FISH N STUC PROD1 Circulate methanol ot of coil.
08:00 - 09:45 1.75 FISH N STUC PROD1 Install kendal connector. Pull test to 30K. Pressure test to
3500 psi.
09:45 - 11 :30 1.75 FISH N STUC PROD1 Wait on orders then memory log and fishing tools.
11 :30 - 11 :45 0.25 FISH N STUC PROD1 MU nozzle.
11 :45 - 14:00 2.25 FISH N STUC PROD1 RIH 1 bpm 700 psi. RIH to 9000 increase rate to 3.0 bpm at
3970 psi.
14:00 - 15:30 1.50 FISH N STUC PROD1 Tag at 9360' take weight. pressure up will not wash down.
Wash 8740 to 9360 on second pass pump 20 bbl Hi Vis
pill. Circulate pill to surface Some additional sand across
screens. Have seen steady sand returns. Through out
cirulation.
15:30 - 17:00 1.50 FISH N STUC PROD1 POH.
17:00 - 18:00 1.00 FISH N STUC PROD1 LD nozzle assy. MU SWS memory GRlCCL assy
18:00 - 19:30 1.50 FISH N STUC PROD1 RIH w/ BHA #18
19:30 - 20:25 0.92 FISH N STUC PROD1 Log down from 8000' CTD at 60'/min 0.4/760 13.8k to tag at
9368' CTD
Log back up at 60'/min 0.4/600 25.8k to 8000'. Flag at 9100'
EOP
20:25 - 21 :40 1.25 FISH N STUC PROD1 POOH
21:40 - 22:15 0.58 FISH N STUC PROD1 LD GRlCCL tools. MU BOT washover assy
22:15 - 23:50 1.58 FISH N STUC PROD1 RIH w/ BHA #19
GRlCCL data tied in to BHI and BHCS GR spike at 9028'
showed tag at 9353.5' ELMD. Flag is at 9084.9' ELMD
23:50 - 00:00 0.17 FISH N STUC PROD1 See EOP flag at 9121.0' CTD (should have been at 9126.5'
CTD or 9111.4' ELMD)-did not correct. RIH
11/25/2003 00:00 - 01 :15 1.25 FISH N STUC PROD1 9300' 23.5k, 9.8k 0.2/710, 0.4/960, 1.0/1400, 2.0/2700,
2.55/3450
RIH and tag at 9363' at min rate. Put 500# WOB and orient 3
clicks. Orient and wash keeping string wt 10-12.5k. Get to
9368.0' and no more progress without stacking wt below 10k.
Repeat after orienting. Not seeing any pressure increase.
Assume tagged up on cement and just corkscrewing CT in 7".
PUH and chk pressures-same. RIH and tag at 9363'. Need to
try something else
01 :15 - 02:45 1.50 FISH N STUC PROD1 POOH
02:45 - 03:15 0.50 FISH N STUC PROD1 LD washover assy-did not get over/to fish (tattle tale pins still
intact and no other signs of tagging). MU fishing assy
03:15 - 04:45 1.50 FISH N STUC PROD1 RIH w/ BHA #20
04:45 - 04:50 0.08 FISH N STUC PROD1 See flag at 9146' CTD (should have been at 9149.2' CTD),
repaint. Did not correct, RIH 1.2/1585
04:50 - 05:15 0.42 FISH N STUC PROD1 Tag at 9363' and 1.2/1540 Make several tags after orients and
can't get past 9363' trying different pump rates. Apply 500#
WOB and orient around trying to get in hole, but stack out.
Didn't get rough-don't want to knock off cement. Need a bent
sub
05:15 - 07:00 1.75 FISH N STUC PROD1 POOH
07:00 - 07:30 0.50 FISH N STUC PROD1 Add 3 degree bent sub to unershot BHA.
07:30 - 08:00 0.50 FISH N STUC PROD1 RIH to 1500
Printed: 12/112003 9:58:54 AM
Page 10 of 13
Operations$ummary Report
Legal Well Name: 02-29
Common Well Name: 02-29 Spud Date: 2/26/1990
Event Name: REENTER+COMPLETE Start: 11/11/2003 End: 11/29/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/29/2003
Rig Name: NORDIC 2 Rig Number: N2
Date From-To Hours Task Code NPT Phase Description of Operations
11/25/2003 08:00 - 08:15 0.25 FISH N STUC PROD1 POH to change BHA
08:15 - 09:30 1.25 FISH N STUC PROD1 Wait on orders on forward plan.
09:30 - 09:45 0.25 FISH N STUC PROD1 PU BHA 21 bald cap crayola mill with orienter to locate pilot
hole and wash to fish.
09:45 - 11 :30 1.75 FISH N STUC PROD1 RIH
11 :30 - 12:45 1.25 FISH N STUC PROD1 Tag at 9368' at min rate and had pressure iner. PUH 24.5k
and orient 3 clicks and try it again w/o pump. Repeat for 360
deg. Repeat for 360 deg orienting 1-2 clicks at a time
12:45 - 14:00 1.25 FISH N STUC PROD1 Start pump at 1.7/2400 RIH and tag at 9368.2' and got motor
work which dropped to FS. RIH slow to 9369.5' and stack 1k
wt and more motor work which wouldn't drill off. Get 2 clicks
and try again 1.75/2480 w/ same result. Repeat for 360 deg wi
same results
14:00 - 14:45 0.75 FISH N STUC PROD1 Become more aggressive. RIH w/ pump at 1.7/2400 and tag at
9368.2'. Stack 5k to 9371.7' and got faster incr in press and
went to stall pressure. Repeat. At 150 deg and after, got 400#
diff, but wouldn't stall. Started getting 5k overpulls at 210 deg.
Got 10k overpull at 300 deg
14:45 - 16:15 1.50 FISH N STUC PROD1 POOH
16:15 - 17:05 0.83 FISH N STUC PROD1 LD assy. Bald cap pilot mill showed bulls-eye of being
centered in CT stub. A ring was wom at the bald/cutrite
interface
Dress washover pipe cutlip guide to be less aggressive
MU washover assy run #2
17:05 - 19:25 2.33 FISH N STUC PROD1 RIH w/ BHA #23. Unexpectedly tagged at 8650'. P/U and look
for flag made after Gr tie-in run earlier. Found and repainted.
RIH to flag corrected +456' to electronic. ?? RIH to 9200'.
Check rates/pressures 1.0/1450, 1.5/2220, 2.0/2970. Upwt.
23.7 dwn wt 12.0. Continue RIH at 10'/min pumping at 1.5
bpm tagged at 9368'. Painted double yellow flag.
19:25 - 00:00 4.58 FISH N STUC PROD1 RIH and attempt to find pilothole or top of fish. Watching
pressures closely for any change. 45 minutes into wshing it
appears we are in pilothole or over fish 1 bpm/1650psi. Reduce
rate to .7 bpm to aviod hydraulically pumping off fish. Continue
to wash. Cycling orienter while on bottom. This doesn't seem to
have any benefit. Maintaining constant 23k wob and pumping
at 2bpm. Starting to see weight retums. Wash down to 9374'.
Pickup 9367' to check not getting stuck. Pipe pulls free also
400psi drop coming off fish. RIH easily to 9374' and continue
washing to 9977.1' hit hard spot sat there for 45 mins then
broke through again. Washed to 9378'.
11/26/2003 00:00 - 01 :50 1.83 FISH N STUC PROD1 Continue washing from 9378' to 9378.8'. Reduce pump to
.75bpm to reduce hydraulic effect without gains. Pushing with
10k. No gain last hour. This might be the end. Pump hi-vis pill
pull up to 9355' and sweep TOC area at 2.3bpm/4000psi work
pill to 9378.8 at reduced rate.
01 :50 - 03:50 2.00 FISH N STUC PROD1 TOH chasing pill. Repaint yellow/blue flag at 9100' EOP. Get to
surface RBIH 500' POH seen good slug of cuttings.
03:50 - 04:25 0.58 FISH N STUC PROD1 P/U Bowen Accelerator and Overshot dressed with 2 1/16" (+/-
1/16" latch) Spiral Grapple. UD washpipe, brass indicator pins
spaced at 8" intervals, shows we washed over at least 6'-8" and
no more than 7'-2" of coil (12'-3" capacity). From all indications
during washover this may be all the coil above the CTC. No
Printed: 121112003 9:58:54 AM
Page 11 of 13
Operations.·Summary Report
Legal Well Name: 02-29
Common Well Name: 02-29 Spud Date: 2/26/1990
Event Name: REENTER+COMPLETE Start: 11/11/2003 End: 11/29/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/29/2003
Rig Name: NORDIC 2 Rig Number: N2
Date Frorn - To Hours Task Code NPT Phase Description of Operations
11/26/2003 03:50 - 04:25 0.58 FISH N STUC PROD1 damage seen on cutlip guide.
04:25 - 05:55 1.50 FISH N STUC PROD1 RIH to 9100' blue/yellow EOP flag. Correct +5'. RIH pumping
at 1.8bpm chck weights p/u 23.5k, dwn 11.6k reduce pump to
.6 bpm RIH tag at 9368'.
05:55 - 07:15 1.33 FISH N STUC PROD1 Work over top of fish. Set down at 9368' and fish not biting.
24k ,11 k 0.5/1230 Orient 2 clicks and try it again and repeat
Gained a little ground and got a bite. RBIH before losing bite
and plant the over shot Confirm with overpull. Stack wt to
swallow to stop. Begin jarring down in increments of weight
stacking and fish not moving down. Jarred down 20 licks. Pull
10k over and jars went off-no movement
07:15 - 07:50 0.58 FISH N STUC PROD1 Begin jarring up starting wi 40k, then working up in 5k
increments in 5 min increments to let jars cool and while
recocking at max down wt. No movement either way up to 55k.
On the next pull got to 45k and the jars went off and it looked
like we slipped off of fish. RBIH and tag at flag(s)
07:50 - 09:15 1.42 FISH N STUC PROD1 POOH to check BHA
09: 15 - 09:40 0.42 FISH N STUC PROD1 Breakdown BHA. Grapple was left in hole. Overshot bowl was
cracked. Could see that CT stub had bottomed at stop.
Assume grapple disintegrated due to jarring
09:40 - 10:55 1.25 FISH N STUC PROD1 Cuss and discussIWOO
10:55 - 11: 15 0.33 FISH N STUC PROD1 Fin LD BHA. Clear floor tools
11:15-17:00 5.75 BOPSUF N STUC PROD1 Weekly BOPE test while build fishing tools. Witness waived by
AOGCC. Grease crew had to service leaking swab and master
17:00 - 19:45 2.75 FISH N STUC PROD1 WO BOT mill
19:45 - 20:15 0.50 FISH N STUC PROD1 Make-up Baker Pirahha mill and motor assembly. Re-torqued
all connections.
20:15 - 22:40 2.42 FISH N STUC PROD1 RIH to 9100'. Correct to flag -2' correction. RIH up wI. 26.3k
dwn wt 12.6k dry tag at 9362'.
22:40 - 00:00 1.33 FISH N STUC PROD1 Pump 1.5bpm 2500psi motor work started at 9362'. Mill to
9364.5'
11/27/2003 00:00 - 07:25 7.42 FISH N STUC PROD1 Continue milling 2" coil from 9365' 1.5bpm 2500FS 350psi MW
600rpm's. Slow go the motor stalls easily due to size more than
anything. Pumping 10 bbl hi-vis sweeps each 2'. Getting good
metal back over shaker wi a few fines on magnets. Milled to
9370' which is 8' of CT leaving a 2' stub above CTC. Circ 20
bbl hi vis pill. Recip 20' at TD 24.2k. See double yellow flags
at 9362.7'. Paint single white at 9300' EOP. Repaint 9100'
EOP flag
07:25 - 09:10 1.75 FISH N STUC PROD1 POOH for washover assy
09:10 - 09:55 0.75 FISH N STUC PROD1 LD milling assy. Mill showed the expected wear for cutting the
CT as planned. No signs of seeing nose stop out on CTC so
assume enough CT left to fish. MU washover assy
09:55 - 11 :30 1.58 FISH N STUC PROD1 RIH wi BHA #26 (2-3/8 motor w/6' washpipe)
See flag at 9100' EOP at 9165.3' (should have been
9151.6')-did not correct. RIH
See flag at 9300' EOP at 9363.8' (should have been
9351.6')-did not correct. 25.5K 0.6/1400 RIH
RIH at min rate and tag at 9378'
11 :30 - 12:05 0.58 FISH N STUC PROD1 Start pump 1.8/2770 RIH 11.7k RIH slow and see sli incr in
press at 9378.0' when washpipe swallowed fish? then stalled
at 9378.3' PUH w/ 4k overpull. Red rate to lower end of motor
HP at 1.3/2110. See sli pressure incr at 9377.7'. RIH and
Printed: 12/1/2003 9:58:54 AM
Page 12 of 13
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
02-29
02-29
REENTER+COMPLETE
NORDIC CALISTA
NORDIC 2
Start:
Rig Release:
Rig Number:
11/11/2003
11/29/2003
N2
Spud Date: 2/26/1990
End: 11/29/2003
Date From - To Hours Task Code NPT Phase DescnptionofOperations
11/27/2003 11 :30 - 12:05 0.58 FISH N STUC PROD1 stalled at 9378.1' 2k overpull. RIH and see sli press incr at
9377.3'. Get 200# diff at 9377.5' which drilled off slow-assume
this is start of fill
12:05 - 13:20 1.25 FISH N STUC PROD1 Wash over with 50-200# diff to 9378.1' and stalled-no overpull
13:20 - 15:10 1.83 FISH N STUC PROD1 Wash back down to 9378.1' and continue making progress. At
9378.8' started stacking a little wt and sli incr in differential.
Get to 9379.1' and gained 2k string wt-no change to diff. PUH
24k, clean. Check flags and all visible and on depths as noted
earlier
15:10 - 16:30 1.33 FISH N STUC PROD1 POOH to check BHA
16:30 - 18:00 1.50 FISH N STUC PROD1 lD washover assy. Tattle tale pins at 0.5' and 1.5' were
sheared. Could see scars from CT stub inside washpipe.
Scars from grapple pieces on outside washpipe
Cut off CTC. PT 40k, 4000 psi. MU new MHA, jars, accel, OS
assy w/2-1/16" grapple
18:00 - 20:00 2.00 FISH N STUC PROD1 RIH correct to flag at 9300' -6' up wt 25.5k dwn wt 1.2k
0.3bpm 1055psi RIH tag 9369'.
20:00 - 21 :00 1.00 FISH N STUC PROD1 Work over fish with OS. After several attempts we're not seeing
any over pulls but we are seeing that the pump pressure will
not bleed-off quickly. Frustrating, we may have the fish which
wouldn't weigh enough to tell but the only indication that
something has changed is the pump pressure. Continue
working the OS for another hour. Either we have it or the OS
may be damaged.
21 :00 - 22:30 1.50 FISH N STUC PROD1 TOH
22:30 - 23:10 0.67 FISH N RIH PROD1 Setback injector. Lift BHA in 1 piece - no fish. No damage to
OS nor any indication the fish entered it Some ding marks on
the OS guide face. Dress up guide. P/U and surface test
orienter and include it into the BHA.
23:10 - 00:00 0.83 FISH N STUC PROD1 RIH
11/28/2003 00:00 - 00:50 0.83 FISH N STUC PROD1 RIH to flag at 9300' correct -9'. P/U wt with .5 pump at 9fpm
26k w/o pump 27.5k dwn wt 15k tag at 9368'.
00:50 - 04:30 3.67 FISH N STUC PROD1 Attempting to workover fish with OS. Trying just about every
trick in the book to get over it Have gone around the clock
several times with the orienter. Once we seen an increase in
pressue and thought we may have at least went onto the fish.
Work pipe without picking up completely off fish for 15 min then
did pick-up but no fish. Continue working coil to the point where
we're finally nearing the limit with coil cycles over the
gooseneck.
04:30 - 06:10 1.67 FISH N STUC PROD1 TOH.
06:10 - 06:40 0.50 FISH N STUC PROD1 LD BHA. Had one small fresh ding on bottom of guide, one
minor scrape just inside the bowl and none on grapple
Send washover pipe to BOT to add cutrite for dressing stub.
Assume top of stub is either slightly flared or that CT memory
has forced stub against liner wall
06:40 - 07:40 1.00 FISH P PROD1 Rig evacuation drill with inadvertent emergengy shutdown of
rig. Restart equipment Discuss
07:40 - 09:20 1.67 FISH N STUC PROD1 WO BOT to dress washpipe
09:20 - 10:10 0.83 FISH N STUC PROD1 MU washover assy (same washpipe wi 2.25" ID, but w/ cutrite
added to taper to 2.03" over 2" as fish is swallowed) to dress
top of stub. Tattle tales at 3",8", 16",28"
10:10-11:40 1.50 FISH N STUC PROD1 RIH wi BHA #29
Printed: 12/112003 9:58:541Wo
Page 13 of 13
Operations Summary Report
Legal Well Name: 02-29
Common Well Name: 02-29 Spud Date: 2/26/1990
Event Name: REENTER+COMPLETE Start: 11/11/2003 End: 11/29/2003
Contractor Name: NORDIC CALISTA Rig Release: 11/29/2003
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
11/28/2003 11 :40 - 13:20 1.67 FISH N STUC PROD1 9300' 26.5k, 12.1k RIH at 0.65/1350 and tag at 9377.3' PUH,
clean. Work washover sub over stub and rolled over to 9377.4'
at 0.65/1350 Incr pump rate slowly to grind off any burrs and
see FS at 1.3/2040. Wash down slowly and see sli loss of
returns while RIH. Get 400# motor work at 9378.9' which
wouldn't drill off. PUH, clean. Resume washing down and
went by 9378.9' w/ no motor work to 9379.4' (should be top of
CTC) and stalled. PUH, clean. RIH and stall at 9379.5', repeat
and stalled at 9379.3'. That's 2.0' and should be the top of
CTC. All pickups were 10' above stub and had no motor work
going by the top
13:20 - 15:00 1.67 FISH N STUC PROD1 POOH to check BHA
15:00 - 16:30 1.50 FISH N STUC PROD1 LD washover BHA. First 3 tattle tales were missing. No
additional scars.
Cut off 170' CT and rehead. PT 40k, 4000 psi. Break all
connections on BHA and rethreadlock and MU BHA (overshot
w/2.0" grapple)
16:30 - 18:00 1.50 FISH N STUC PROD1 RIH w/ BHA #30 tagged fish at 9377' uncorrected depth.
18:00 - 22:25 4.42 FISH N STUC PROD1 Attempting to workover fish with OS. Cycling orienter 1 click
intervals working wlwo pump on. Did this numerous times by
setting on fish with light weights and orienting and then within
the 7" and then making a run at the fish. Tryed jarring down but
jars quit working after 6 licks Oars are opened each time pump
is used). Ordered 2% KCL to displace tbg and continued
working OS and orienter with no hint of ever getting over fish.
It's been decided to halt fishing operations. PUH to tbg tail at
8740'.
22:25 - 00:00 1.58 FISH N STUC PROD1 TOH and displace tbg with 2% KCL.
11/29/2003 00:00 - 00:15 0.25 FISH N STUC PROD1 Continue TOH while displacing tubing with 2% KCL.
00:15 - 01:00 0.75 FISH N STUC PROD1 UD fishing tools. Checking overshot it was noticed that the fish
was swallowed 10.75" which put it exactly half way into the
grapple itself. No clues as to why the fish didn't continue into
the OS body for another 12". The grapple was not damaged
other than paint removal to the half way point. There were no
scars on the face of guide as seen on previous runs but there
was 1 very shallow sharp gouge on the inside for 2-3".
MIU freeze protect stinger/nozzle assembly.
01 :00 - 03:00 2.00 RIGD P POST RIH to 2500'. Displace well with 38 bbls 60/40 methanol.
03:00 - 06:00 3.00 RIGD P POST Unstab coil from injector. Secure injector. Spoil back coil to reel
and secure. Swap reels. Same time blowdown BOP stack.
06:00 - 08:00 2.00 RIGD P POST ND BOPE
Rig Released at 0800 hrs 11/29/2003
RD events are on K-10 Daily Reports starting 11/29/2003
Printed: 12/112003 9:58:54 AM
.
.
02-29B, Ops Shutdown, Stuck BHA
Prudhoe Bay Unit
50-029-22011-02
203-146
Accept:
Spud:
Release:
Ri:
POST RIG WORK - UNSUCCESSFUL
12/06/03
DRIFT FOR NORDIC BHA FISH WI 2.68 CENT 3' 1718 STEM 2.71 LIB.
12/07/03
CONT. RIH WI 2.68 CENT 3' 1 7/8 STEM 2.71 LIB. TAG FILL @ 9344' SLM POOH. RIH WI 10' X 2.50 PUMP
BAILER. BAIL FROM 9354' SLM (LARGE METAL SHAVINGS). DRIFT WI 2.71 LIB SD @ 9354' SLM (GOOD
IMPRESSION ON COIL TOP). DRIFT WI 270 BELL GUIDE I POCKET POKER (BRASS TATTLE TAIL PINS) SO
@ 9354' SLM. (TATTLE TAIL PINS BENT 16" UP INSIDE BELL GUIDE). RDMO.
01/04/04
RIH WI KJ 31/2 GR 2.80 BAKER OVER SHOT (2" GRAPPLE). SD @ 8699' SLM (XN NIPPLE; BAIT SUB
WOULD NOT PASS THRU). HOT SHOT TO BAKER TO HAVE OVER SHOT TURNED FROM 2.8" DOWN TO
2.7" OD. JOB IN PROGRESS.
01/05/04
RIH WI KJ 31/2 GR 2.70 BAKER OVER SHOT (2" GRAPPLE) (35" OAL). SET OVER SHOT ON CTD FISH @
9352' SLM. OOH WIO OVER SHOT. RDMO.
01/07/04
SPOT EQUIP. SWITCH TO BRAIDED LINE, RIG UP WI EXTRA LUBRICATOR. RIH WI 3112 GS. JOB IN
PROGRESS.
01/08/04
RIH WI 31/2 GS I SD @ 9302' BLM LATCH OVER SHOT SET ON CTD FISH PULL 1800# OJ LICK POOH. OOH
WI OVER SHOT I 2" SPIRAL GRAPPLE MISSING FROM INSIDE OF OVER SHOT. RIH WI 2.50
DECENTERALlZER 2.70 LIB SD @ 9304' BLM I MARK FROM SPRIAL ON LIB. RIH WI 2.62 BLIND BOX SD @
9304' BLM HIT DWN. POOH. RIH WI 2.50 DECENTERALlZER 2.70 LIB SO @ 9304' BLM I MARK FROM COIL
ON LIB. RIH WI KJ 3 1/2 GR 2.70 SPEAR 1.67 GRAPPLE SD @ 9304' BLM. LATCH FISH @ 9304' BLM PULL
2000# OJ LICK. APPEARED TO PULL FISH FROM BTM, THEN LOST EXTRA WEIGHT @ 5000'. RIH WI KJ
2.50 DECENTERALlZER 2.60 BG 1.46 LIB. JOB IN PROGRESS.
01/09/04
SD @ 9304' BLM WI KJ 2.50 DECENTERALlZER 2.60 BG 1.46 LIB POOH. RIH WI KJ 3 1/2 GR 2.70 SPEAR
1.67 GRAPPLE. SD @ 9304' BLM. PULL OJ LICKS WORK UP TO 2200# OJ LICKS PULL FREE POOH. RIH
WI KJ 2.50 DECENTERALlZER 2.71 LIB I SO @ 9304' BLM POOH.
01/11/04
ATTEMPT TO SET SPEAR IN CT FISH. SET 2.60 SPEAR IN CT FISH @ 9304' BLM. OOH WI 3112 GR (PIN
SHEARED). RIH W/3 1/2 GS LATCH OVER SHOT @ 9304 BLM POOH WI OVER SHOT. CIO GRAPPLE
FROM 1.615 TO 1.757. SET 2.60 SPEAR ASS EM. WI 1.757 GRAPPLE @ 9304' BLM. RIH W/3 1/2 GS. JOB IN
PROGRESS.
01/12/04
RIH W/3 1/2 GS LATCH SPEAR SET @ 9304' BLM. SPEAR PULLED FREE FROM FISH WHILE JARRING.
RIG DWN. BRAIDED LINE SECURE WELL.
1REE= ow GEN 4 SAFE S: REDRlLL NOT SIDETRACKED, 9-5/S"
WELLÆAD= OW 02-298 CSG LEAK LDL 06/22/03, OA DOWNSQZ'D 07/31/03
AClUATOR= AXELSON *OPEN HOLE= 9443' -10707' W/O LNR*
KB. ELBI - 62'
BF. ELBI = NÞ.
KOP- 900' I 2239' 4-1/2" AVA TRSV, ID =3.813" 1
Mix Ançle = 29 @. 3600' / . ,/
Datum MJ = 9570'
Datum 1V D = 8800' SS ---t. 3011' 4-112" X 3-1/2" XO
113-3/8" CSG, 6f5#, K-55. ID = 12.415" ",,/ - -
104' GAS LIFT MANDRELS
1~1/2" IR:: 18G, 12.6#, L-80, BTC MOD, 3011' V ST MJ TVD DEV TYPE VLV LA TCH PORT Dt\TE
1 3361 3211 27 MMG RK -
.0152 bpf, ID=3.958" 2 4564 4265 29 MMG RK -
113-318" CSG, 68#, L-80, ID = 12.415" 3923' ~ ~ 3 5669 5254 26 MMG RK -
4 6802 6277 26 MMG RK -
5 7137 6579 26 MMG RK -
rU:AK IN 9-5/8" 6 7723 7103 27 MMG RK -
6345' 7 8057 7403 24 MMG RKP -
CrEMCAL MANDRELS
L ISTI MJ ITVDIDEVI TYPE I VLV I LATCH I PORT I Dt\TE
c I 8 18548178621 16 I MMGL TSRI DOI\¡£ 1 RK I - 105114190
I~inimum ID = 2.992" @ 8740' I J ~ I 8633' 3-1/2" BAKER LOCSEAL ASSY I
3-1/2" TUBING I-,.
~ .., 8636' 9-5/8" X 3-1/2" BA KER MODEL D PKR I
8655' 3-1/2" BAKER MLLOUT EXT, D = 6.00" I
I 1m! 8683' TOP OF T' LNR BA KER HYDRO II HGR
I I 8727' 3-1/2' 011S XN NIP, MILLED TO ID = 2.80" I
I I H I
8739' 3-1/2" BAKER SÆAR OUT SUB
13-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" 8740' I 8740' 3-1/2"TBGTAILWIWLB31
...,
19-5/8" CSG, 47#, L-80, ID = 8.681" 9099' J ~ I 8719' H ELMD TT LOGGB:> 04/26/90 I
TOP OF OvIT AND START OF 2.74" 9355' ~
PILOlriOLE FOR CMT" RA M' EXIT ~
TOP OF 2" COIL FISH - BHA. 52' X 2.70" fv1AX OD 9375' ~
~ I I
WINDOW 9443' - 9450'
PERFORATION SLMfv1ARY ~
REF LOG: SWS ŒT ON 03/13190 ~
ANGLEATTOPPERF: 11 @9631'
f\bte: Refer to A'oductbn œ for historical oerf data
SIZE SA" INTERVAL Opn/Sqz DATE
2-1/8" 4 9631 - 9646 S FROFQSED
2-5/8" 4 9664 - 9668 S FROFQSED
2-518" 4 9671 - 9682 S FROFQSED ~
I FBTD 9680' 1 OÆN HOLE
I I
17" LNR. 29#, L-80, BTC, .0371 bpf, ID = 6.184" 9791' I
I TO 10486' I
18" erc EXT CSG R<R 9556'
I m 10707' I
DATE REV BY CO fvtv1ENfS Dt\ TE RBI BY CO fvtv18\1TS FRLDHOE BA Y UNIT
02/26/90 ORIGINAL COMPLETION WELL: 02-298
10/07/03 TM fo¥TLP SUSPEtÐED CTD SIŒTRACK PERMIT No: 2031460
AA No: 50-029-22011-01
SEe 36, T11 N, R14E. 161.22' FEL & 5259' FNL
BP Exploration (Alaska)
· BP-GDB .
Baker Hughes INTEQ Survey Report
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2003
Site: PB DS 02
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5948800.37 ft
687638.44 ft
Latitude: 70 15
Longitude: 148 28
North Reference:
Grid Convergence:
53.847 N
58.060 W
True
1.43 deg
Well: 02-29A Slot Name: 29
02-29A
Well Position: +N/-S 1514.17 ft Northing: 5950336.13 ft Latitude: 70 16 8.739 N
+E/-W 888.73 ft Easting : 688489.10 ft Longitude: 148 28 32.190 W
Position Uncertainty: 0.00 ft
Wellpath: 02-298
500292200202
Current Datum: 57: 291/22/1990 00:00
Magnetic Data: 11/24/2003
Field Strength: 57586 nT
Vertical Section: Depth From (TVD)
ft
33.00
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
02-29A
9444.70 ft
Mean Sea Level
25.56 deg
80.86 deg
Direction
deg
350.00
Height 63.00 ft
Survey Program for Definitive Wellpath
Date: 1/15/2004 Validated: Yes Version: 6
Actual From To Survey Toolcode
ft ft
34.40 9426.40 1 : Schlumberger GCT multishot (34.40-104~
9444.70 10707.00 MWD (9444.70-10707.00) MWD+SAG
Tool Name
Schlumberger GCT multishot
MWD + Sag correction
Annotation
Survey: MWD Start Date: 11/22/2003
Company: BakerHugheslNTEQ Engineer:
Tool: MWD+SAG,MWD + Sag correction Tied-to: From: Definitive Path
Survey
9426.40 11.02 69.56 8721.94 8658.94 850.26 3186.96 5951265.88 691653.58 283.94 0.00
9444.70 10.97 69.41 8739.91 8676.91 851.49 3190.23 5951267.18 691656.82 284.57 0.31
9450.00 12.31 65.13 8745.10 8682.10 851.90 3191.22 5951267.62 691657.79 284.81 30.06
9480.31 22.51 36.05 8774.03 8711.03 857.98 3197.59 5951273.85 691664.01 289.69 43.28
9510.81 28.64 17.87 8801.57 8738.57 869.69 3203.28 5951285.70 691669.41 300.23 32.45
9541.55 33.85 6.90 8827.87 8764.87 885.22 3206.58 5951301.31 691672.32 314.95 25.04
9573.04 40.89 357.26 8852.90 8789.90 904.26 3207.14 5951320.36 691672.40 333.61 29.01
9610.68 52.72 346.83 8878.65 8815.65 931.28 3203.12 5951347.27 691667.70 360.92 37.28
9642.22 60.27 345.12 8896.05 8833.05 956.77 3196.73 5951372.59 691660.68 387.13 24.36
9672.66 70.22 348.40 8908.79 8845.79 983.65 3190.44 5951399.30 691653.72 414.69 34.11
9703.10 76.81 354.55 8917.43 8854.43 1012.49 3186.15 5951428.02 691648.71 443.84 29.04
· BP-GDB .
Baker Hughes INTEQ Survey Report
9736.22 80.07 1.61 8924.07 8861.07 1044.89 3185.07 5951460.38 691646.82 475.94 23.08
9766.35 84.26 359.20 8928.18 8865.18 1074.73 3185.28 5951490.22 691646.28 505.29 16.00
9795.29 90.28 356.44 8929.56 8866.56 1103.60 3184.18 5951519.05 691644.46 533.91 22.88
9827.30 98.14 5.14 8927.20 8864.20 1135.47 3184.61 5951550.91 691644.09 565.22 36.56
9862.21 97.14 11.84 8922.56 8859.56 1169.67 3189.71 5951585.23 691648.34 598.01 19.24
9894.16 95.44 14.43 8919.06 8856.06 1200.59 3196.93 5951616.32 691654.78 627.21 9.66
9930.82 93.35 20.65 8916.24 8853.24 1235.42 3207.94 5951651.42 691664.91 659.60 17.85
9961.78 93.87 26.97 8914.29 8851.29 1263.68 3220.41 5951679.97 691676.67 685.26 20.44
10003.83 93.10 32.06 8911.74 8848.74 1300.19 3241.08 5951716.99 691696.42 717.63 12.22
10033.01 93.78 28.37 8909.98 8846.98 1325.36 3255.74 5951742.51 691710.44 739.87 12.84
10065.96 92.24 26.69 8908.25 8845.25 1354.53 3270.95 5951772.06 691724.91 765.96 6.91
10099.09 91.72 20.20 8907.11 8844.11 1384.89 3284.11 5951802.74 691737.31 793.57 19.64
10141.07 93.72 15.37 8905.11 8842.11 1424.81 3296.92 5951842.96 691749.11 830.66 12.44
10172.64 94.33 13.50 8902.90 8839.90 1455.30 3304.77 5951873.64 691756.19 859.33 6.22
10204.71 94.64 13.72 8900.39 8837.39 1486.38 3312.29 5951904.89 691762.93 888.62 1.18
10234.21 95.78 9.90 8897.71 8834.71 1515.13 3318.30 5951933.78 691768.22 915.89 13.46
10264.21 94.98 4.81 8894.90 8831.90 1544.74 3322.12 5951963.48 691771.30 944.39 17.10
10296.05 95.53 358.86 8891.98 8828.98 1576.41 3323.14 5951995.17 691771.53 975.41 18.69
10332.30 96.06 353.21 8888.31 8825.31 1612.38 3320.65 5952031.05 691768.13 1011.26 15.58
10361.77 97.04 349.00 8884.95 8821.95 1641.30 3316.12 5952059.85 691762.89 1040.52 14.58
10394.11 95.57 345.98 8881.40 8818.40 1672.67 3309.16 5952091.04 691755.14 1072.63 10.33
10426.07 92.60 340.45 8879.12 8816.12 1703.18 3299.96 5952121.30 691745.18 1104.27 19.60
10461.41 89.17 336.90 8878.58 8815.58 1736.08 3287.11 5952153.87 691731.51 1138.91 13.97
10490.17 89.75 331.08 8878.85 8815.85 1761.92 3274.50 5952179.38 691718.26 1166.54 20.34
10520.75 92.97 328.31 8878.12 8815.12 1788.31 3259.08 5952205.37 691702.18 1195.20 13.89
10549.95 92.58 324.94 8876.71 8813.71 1812.66 3243.04 5952229.32 691685.54 1221.97 11.60
10579.95 91.69 321.84 8875.59 8812.59 1836.72 3225.16 5952252.92 691667.07 1248.77 10.74
10612.66 90.58 323.35 8874.94 8811.94 1862.70 3205.30 5952278.39 691646.56 1277.80 5.73
10639.64 90.74 326.12 8874.63 8811.63 1884.72 3189.72 5952300.02 691630.44 1302.20 10.28
10671.05 91.20 329.83 8874.10 8811.10 1911.34 3173.07 5952326.21 691613.13 1331.31 11.90
10707.00 91.20 329.83 8873.34 8810.34 1942.42 3155.01 5952356.82 691594.29 1365.05 0.00
BP Amoco
WELLPATH DETAILS
02-298
500292200202
Parent Well path: 02-29A
Tie on MD: 9444.70
Rig: Nordic 2
Ref. Datum: 57 : 29 1/22/1990 00:00 63.0011
V.Sectlon Orl91n Orl91n Starting
Angle +N/·S +EI·W From TVD
350.00' 0.00 0.00 33.00
REFERENCE INFORMATION
Co-ordinate ~E¡ Reference: Well Centre: 02-29A, True North
Vertical ( D Reference: System: Mean Sea Level
Section (VS Reference: Slot - 29 (O.OON,O.OOE)
Measured Depth Reference: 57: 29 1/22/199000:00 63.00
Calculation Method: Minimum Curvature
1/15/2004
Wel1path: (02·29N02-29B)
Dale:
Created By: Brij Potnis
Contact !r;forrn3tior::
Bai<.er Huqíw:,:,.
Azimuths to True North
Magnetic North: 25.56'
Magnetic Field
Strength: 57586nT
~~t::nf172:g:~
Model: bggm2003
M
'.
T
02-29A,02-29B,Planl#
02·29A (02·29A)
02-298
.
2500
....
.5201
=
0191
o
...
..., 81
-
+
Z1700
1::
0161
Z
-
'Î'15'
-
.c
'5141
o
U)131
+EJ-W Shape
303.370 Po/ygOl\
2708.02 P~9""
2241.81 PoIy9""
2590.39 Polygon
2251.54 Polygon
~g¡~:~ þ:
mu: þoIygoo
mIl ¡r
TARGET DETAILS
WD +NI-S
0.0098528
0.001681.69
0.001680.37
0.002416.91
0.002308.36
0.002469.90
0.001814.22
0.001512.85
0,001898.13
8781.002580.23
8793.002179.73
8814.001614,02
8834.001444.85
=~:gg i~~:~~
ANNOTATIONS
TVD MD Annotation
8658.94 9426.40 TIP
8676.91 9444.70 KOP
TO
.
".....,.,,.,....[......
4400 4500 4600
26'00 2700 2800 2900 3000 3100 3200 3300 3400 3500 3600 3ioo
West( - )/East( +) [100ft/in]
700
650
600
550
500
950 1000 1050 11'00 1150 1200 1250 1300 1350 1400 1450
Vertical Section at 350.00' [50ft/in]
~5'
i!85
o
II)
~61
.c
..
1:1.86
CÞ
Q m
_8700-'
1':1
.~87
1::
CÞ881
>
CÞ
288
... 891
>,
\¡JC1A- Il-I zvl ¿OO'š
_ STATEOFALASKA . JJ0 IL/2.4-/3
ALASKA O~AND GAS CONSERVATION COM oSION ~ (vi U.e 1fí2-...
APPLICATION FOR SUNDRY APPROVAL v J
20 MC 25.280
1. Type of Request:
o Abandon
o Alter Casing
o Change Approved Program
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage. Alaska
7. KB Elevation (ft):
o Suspend
o Repair Well
o Pull Tubing
I
181 Operation Shutdown 0 Perforate
o Plug Perforations 0 Stimulate
o Perforate New Pool 0 Re-Enter Suspended Well
4. Current Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
o Variance
o Time Extension
o Annular Disposal
5. Permit To Drill Number
203-146 /"
6. API Number: /'
50-029-22011-02-00
o Other
99519-6612
KBE = 63'
9. Well Name and Number:
PBU 02-29B /'
8. Property Designation:
10. Field I Pool(s):
ADL 028308 Prudhoe Bay Field / Prudhoe Bay Pool
PRESENT WELL CONDITION SUMMARY
Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
8873 10707 W 8873 ~ ~75
., ~ I. '~~
11.
Total Depth MD (ft):
10707
~.
Str"Nl'ral
r.nnrllll~tnr
Surf"'t'Q
IntAr
PrnrIJ 't'tion
LinAr
112' 20" 112' 112' 1530 520
3923' 13-3/8" 3923' 3704' 3450 1950
9099' 9-5/8" 9099' 8401' 6870 4760
1108' 7" 8683' - 9443' 7993' - 8739' 8160 7020
Perforation Depth MD (ft): I Perforation Depth TVD (ft): I
None None
Packers and SSSV Type: 9-5/8" x 3-1/2" Baker 'D' packer;
4-1/2" AVA TRSV
Tubing Size:
4-1/2" x 3-1/2"
Tubing Grade:
L-80
Packers and SSSV MD (ft):
I
Tubing MD (ft):
8740'
8636'
2239'
12. Attachments:
181 Description Summary of Proposal 0 BOP Sketch
o Detailed Operations Program
14. Estimated Date for
Commencing Operations:
16. Verbal Approval:
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Printed Name Dan Key}'" ì Title CT Drilling Engineer
Si<:¡nature ~ ~ (~~ Phone
- (" . '.
13. Well Class after proposed work:
o Exploratory 181 Development 0 Service
1~
~
15. Well Status after proposed work:
181 Oil 0 Gas
o WAG 0 GINJ
o Plugged
DWINJ
o Abandoned
o WDSPL
Contact Dan Kara, 564-5667
564-~67
Iy ,'.
Prepared By Name/Number:
Date 12.. 2.31 03 Terrie Hubble, 564-4628
.' .',
I Sundry Number: ·~""c,,;o -.3 fi ¿;,
Conditions of approval: Notify Commission so that a representative may witness
o Plug Integrity
o BOP Test
o Mechanical Integrity Test
o Location Clearance
Other:
RECEIVED
DEC 232003
~,&I,~ De,:; fl1:,t f)), o..,. ~t.¡¡,' ,.
~';Ylf !jj", !j¡1g¡.,,,,, ~ i} M.i
Subsequent form required 10- 40 'f
Original Signed By
Approved By: Sarah Palin
Form 10-403 Revised 2/2003
COMMISSIONER
Alaska Oil & Gas Cons. Commi$$ion
Anchorage . .
BY ORDER OF /7/-7 j, 1/2
THE COMMISSION Date I U L:-lj £I'
OR'GI~LAL
Submit In Duplicate
bp
.
.
Danny T. Kara
Drilling Engineer
Drilling & Wells
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519·6612
(907) 561·5111
December 23, 2003
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
Reference: 02-29B, Permit to Drill, 203-146
Direct: (907) 564-5667
KaraDT@bp.com
To Whom It May Concern:
/'
We are belatedly requesting Operations Shutdown status for this well. Problems were
encountered during the drilling operations and somehow it was overlooked that we ;'"
should have submitted this request for an Operations Shutdown while remedial plans
were worked out.
Summary of events are as follows: Nordic 2 CTD sidetracking operations began on
11/11/2003. Plans were to mill a window from a 17 ppg cement ramp. The cement had
low compressive strength requiring underreaming and recementing with 17 ppg slurry.
An attempt to mill a 2.74" window at 9485' MD failed when the mill did not exit the
casing. The well was again recemented with 17 ppg slurry. A successful 2.74" window
was milled from 9443'-9450' MD. The Zone 1 interval was direction ally drilled to 10707'
MD, approximately 2/3rds of the planned openhole length. While tripping coil for a
BHA change, the BHA became stuck in the 2.74" pilot hole in 7" casing, above the
window. Coiled tubing was cut and pulled from the hole. Several unsuccessful attempts /'
were made at recovering the BHA. Nordic 2 was rigged down and released on 11/29/03.
Plan forward is to rig up wireline and/or service CTU to continue fishing operations. If
fishing operations are successful, an attempt may be made at determining if the drilled
hole is still open. Most likely case will be to cement the well and mill a new window up
hole.
Thank you very much for your assistance in this matter.
~')\)
~
WELLHEAD =
ACTUATOR =
KB. ELEV =
SF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum TVD =
crvv GEN 4
crvv
AXELSON
62'
13-3/8" CSG, 68#,
K-55, ID = 12.415"
3.958"
113-3/8" CSG, 68#, L-80, ID= 12.415" I
13-1/2" TaG, 9.3#, L-80, .0087 bpf, ID = 2.992" I
2239'
3011'
PORT
8633'
8636'
8655'
8683'
8740'
3-1/2" BAKER SHEAR OUT SUB
3-1/2" TUBING TAIL WIWLEG
8719' H ELMD 1T LOGGED 04/26/90 I
I 9-5/8" CSG, 47#, L-80,ID = 8.681" I 9099'
ÆRFORA TION SUMMARY
REF LOG: SWS CET ON 03/13/90
ANGLEATTOPPERF: 11 @9631'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL DATE
2-118" 4 9631-9646
2-5/8" 4 9664-9668
2,-5/8" 4 9671-9682
I PST¡:;¡ I 9680'
I 7" LNR, 29#, L-80, 6TC, 0.0371 bpf, ID = 6.184"
DATE
02/26/90
01/02/01
02/14/01
02/02/02
1 0/07103
6[J
REV BY COMMENTS
ORIGINAL
SIS-SLT CONVERTEDTOCANVA$
SIS-MD FINAL
RNITP CORRECTIONS
MSE Proposed CTD sidetrack
10486'
REV BY
COMMENTS
PRUDHOE BAY UNrr
WELL: 02-296
API No: 50-029-22011-01
SEC36 T11N R14E 161.22 FEL 5259 FNL
BP Exploration
.
.
íffi
~l
r¡,
I
Lb
~
FRANK H. MURKOWSKI, GOVERNOR
AI.ASIiA OIL AND GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE,SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Alistair Sherwood
CT Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re: Prudhoe Bay Unit PBU 02-29B
BP Exploration (Alaska), Inc.
Pennit No: 203-146
Surface Location: 887' SNL, 1740' EWL, Sec. 36, TIIN, RI4E, UM
Bottomho1e Location: 1692' NSL, 4601' EWL, Sec. 25, TIIN, RI4E, UM
Dear Mr. Sherwood,
Enclosed is the approved application for pennit to redrill the above development well.
This pennit to redrill does not exempt you from obtaining additional penn its or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required pennits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the pennit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the tenns and conditions of this pennit may
result in the revocation or suspension of the pennit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
BY ORDER OF THE COMMISSION
DATED this~~ day of August, 2003
cc: Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Exploration, Production and Refineries Section
\¡U(ÍA- 1/~lll."O~
. STATE OF ALASKA _
ALASKA AND GAS CONSERVATION CO_ISSION
PERMIT TO DRILL
20 AAC 25.005
o Drill II Redrill
1 a. Type of work 0 Re-Entry
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612
4a. Location of Well (Governmental Section):
Surface:
887' SNL, 1740' EWL, SEC. 36, T11N, R14E, UM
Top of Productive Horizon:
56' SNL, 4871' EWL, SEC. 36, T11N, R14E, UM
Total Depth:
1692' NSL, 4601' EWL, SEC. 25, T11N, R14E, UM
11b. Current Well Class 0 Exploratory
I 0 Stratigraphic Test 0 Service
5. Bond: !HI Blanket 0 Single Well
Bond No. 2S100302630-277
6. Proposed Depth:
MD 11400' TVD 8781'
7. Property Designation:
ADL 028308
II Development Oil 0 Multiple Zone
o Development Gas 0 Single Zone
11. Well Name and Number: ./
PBU 02-29B
12. Field I Pool(s):
Prudhoe Bay Field / Prudhoe Bay
Pool
8. Land Use Permit:
13. Approximate Spud Date/
09/25/03
14. Distance to Nearest Property:
32,106'
9. Acres in Property:
2560
4b. Location of Well (State Base Plane Coordinates):
Surface: X-688489 y-5950336 Zone;o\SP4
16. Deviated Wells:
Kickoff Depth
18. CasihgPr~ram
Sizè
Hole Casina Weiaht
4·1/8" x 3-3/4" 3-3/16" x 2-3/8" 6.2# / 6.5#
10. KB Elevation 15. Distance to Nearest Well Within Pool /
(Height above GL): KBE = 63' feet 02-02A is 524' away at 10775'
17. Anticipated pressure (see 20 AAC 25.035) ./
9485 ft Maximum Hole Angle 960 Max. Downhole Pressure: 3725 psig. Max. Surface Pressure: 2669 psig
m~iol11... Q~b?~~ro:a~~~~~t
Grade Couolina Lenath MD TVD MD TVD Cincludina staae data)
L-80 CIII STl 2717' 8683' 7994' 11400' 8781' 74 sx Class 'G' .,/
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill AND Re-entry Operations)
Total Depth MD (ft):
10486
~o.,¡nn
Total Depth TVD (ft): I Plugs (measured): Effective Depth MD (ft): IEffective Depth TVD (ft): Junk (measured):
9763 9712 9712 I 9003 I None
. Length· , . ... Mn ~. . TVD
~trllr.tllr;:¡1
CondlJdor 112' 20" 2150# Poleset 112' 112'
~ . 3923' 13-3/8" 2000 sx CS III, 600 sx Class 'G'; Top Job 250 sx CS II 3923' 3704'
Int 9099' 9-5/8" 450 sx Class 'G' 9099' 8401'
Production
LinAr 1108' 7" 250 sx Class 'G' 8683' - 9791' 7993' - 9080'
20. Attachments !HI Filing Fee !HI BOP Sketch
o Property Plat 0 Diverter Sketch
IPerfOration Depth TVD (ft): 8923' - 8973'
!HI Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis
o Seabed Report !HI Drilling Fluid Program !HI 20 AAC 25.050 Requirements
Perforation Depth MD (ft): 9631' - 9682'
21. Verbal Approval: Commission Representative: Date:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Alistair Sherwood, 564-4378
Printed Name Aji,t,ir Sr~ood I Title CT Drilling Engineer
-IIlIJI./ X' A. / .. jo..1 _III. L Prepared By Name/Number;
Signature fVr-t,...; ~_ _ \ Phone 564-4378 Date ~/20/o1 Terrie Hubble, 564-4628
..' ' .' " T "
Permit To Drill API Number: I Permit Approy¡¡tl / L /1..-... I See cover letter for
Number: ZCJ';}-' J c'/ç; 50-029-22011-02-00 Date: .-;../Jf7n'p/ I other requirements
Conditions of Approval: Samples Required 0 Yes ~No Mud Log ReqJired I 0 Yes J8I No
Hydrogen Sulfide Measures ~ Yes 0 No Directional Survey Required ~ Yes 0 No
Other: Î~<;.t- BoPE to ~~OO p'¡
Original Signed By
Sarah Palin
BY ORDER OF
COMMISSIONER "TJ-iE COMMISSION
UKib"\JAL
/]/:;,1) bø;
S~bmit Ih Du~licate
Aooroved Bv:
Form 10-401 Revised 3/2003
Date
e
e
BP
02-29B CTD Sidetrack
Phase 1 Operations: Prep work
· Integrity test IA & OA annuli, wellhead seals & Xmas tree valves
· Drift &calliper the production liner and tubing to check mechanical integrity
· S-Coil to lay in 17 ppg cement from 9680' )PBTD464' to approx. 9430' to provide for a cement
whipstock. 20bbls of cement will be pumped to make the plug.
Phase 2 Operations: Mill window, Drill and Complete sidetrack: Planned for Sep 25th, 03.
A CTD milling BHA will cut a window in the 7" liner at 9485' MD (8779'ss) off of the cement plug. A
minimum of 2 BHA will drill the build & lateral sections of the sidetrack as per the attached directional plan.
The max hole angle will be _95°. Solid 2%" liner will complete the sidetrack, which will be cemented and
selectively perforated.
/
Mud Program:
· Phase 1: Seawater/1 % KCI
· Phase 2: Mill with seawater / ~Ib biozan, drill with Solids Free Flo-Pro (8.6 - 8.7 ppg) /
Disposal:
· All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
· All Class I wastes will go to Pad 3 for disposal.
Casing Program: ,
The production liner will be solid 2%" ST-L from a~ÿ:"'11,400', (-8781'ss) to 8683'MD (7994'ss) within
the tbg tailpipe The liner will be cemented with ~Dls with a planned TOC of 9230' within the 7" liner.
1(":
Parent Well Casinos OH size Burst (psi) Collapse (psi)
13%" 68#, K-55, BTC - Surface CSG 17% 3450 1950
9%" 47#, L-80, BTC - Intermediate CSG 12'A 6870 4760
7" 29#, L-80, BTC - Production CSG 8V2 8160 7020
Sidetrack Casinos
3-3/16" 6.2#, L-80, TCII- Prod LNR 4Ys 8520 7660
2Ys" 6.5#, L-80, STL - Prod LNR10570 3% 10570 11170
Well Control:
· BOP diagram is attached. /
· Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3500 psi.
· The annular preventer will be tested to 400 psi and 2500 psi.
Directional
· See attached directional plan. Max. planned hole angle is 95 deg.
· Magnetic and inclination surveys will be taken every 30 ft. ~gyro will be run.
· 02-29B will be 524' away from well 02-02A at 10,775'md
· 02-29B at TD will be 32,106' from the change of ownership boundary, (Prudhoe Bay Unit)
Logging
· MWD Gamma Ray will be run in the open hole section. Memory CNL will be run inside the liner.
Hazards
· The maximum recorded H2S on 2-29A is 100 ppm and was recorded back in Oct 92.
· Conglomerates in upper Z2 may cause slow ROP & possible bit damage.
· One, possibly two faults will be cut by the wellpath. The risk of a lost circulation event is considered
low to medium risk.
Reservoir Pressure /
· Res. press. is estimated to be 3725 psi at 8800'ss (7.2 ppg emw). Max. surface pressure with gas
(0.12 psi/ft) to surface is 2669 psi../
TREE = CrN GEN 4 It
WELLHEAD = CrN 02-29A e SAFETY NOTES: REDDRlLL NOT
ACTUA TOR = AXa.SON SIDETRACKED
.---.-.--..--...--.._-_.."
KB: ELEV = 63'
BF. ELEV = -14-1/2"AVATRSV,ID=3.813" I
KOP= 900' 2239'
Max Angle = 29 @ 3600' 113-3/8" CSG, 68#, 104' ~ . 1/
Datum MD = 9570' K-55, ID = 12.415" l--i 3011' "4-1/2" X 3-1/2" XO I
DatumlVD= 8800'SS V y GAS LIFT MANDRELS
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" 1 3011' Y V ST MD lVD DEV TYÆ VLV LATCH PORT DATE
Y ~ 1 3361 3211 27 MMG RK
TOPOF 3-1/2" TBG I 3011' 2 4564 4265 29 MMG RK
3 5669 5254 26 MMG RK
}--.4 ~ 4 6802 6277 26 MMG RK
113-3/8" CSG, 68#, L-80, ID = 12.415" I 3923' 5 7137 6579 26 MMG RK
6 7723 7103 27 MMG RK
7 8057 7403 24 MMG RKP
7'ï CHEIVIICAL MANDRELS
Minimum ID = 2.75" @ 8727' 1ST MD 1 TVDI DEVI TYÆ VLV 1 LATCH I PORT DATE
~ I 1 8548178621 16 1 MMGL TSR DOME 1 RK I 0.188 05/14/90
3-1/2" OTIS XN NIPPLE
J ~ I 8633' -13-1/2" BAKER LOC SEAL ASSY I
L 8636' -19-5/8" X 3-1/2" BAKER MODEL D PKR I
¡..::::::. I
8655' H3-1/2" BAKER MILLOUT EXT I
TOP OF 7" LNR I 8683' I I
. r 8727' -13-1/2" OTIS XN NIP, ID = 2.75" I
I 8739' H 3-1/2" BAKER SHEAR OUT SUB I
13-1/2" TBG, 9.3#, L-80, .0087 bpf, ID = 2.992" I 8740' I 8740' -13-1/2" TUBING TAIL WIWLEG I
I
I 8719' H ELMD TT LOGGED 04/26/90 I
19-5/8" CSG. 47#, L-80, ID = 8.681" I 9099' I ) ~
~ ¡..." 9556' -18" BAKER CTC EXTERNAL CSG PKR I
CI I
[) I
PBTD I 9712' I
17" LNR, 29#, L-80, .0371 bpf, ID = 6.184" I 9791'
PERFORATION SUMMARY
REF LOG: SWS CET ON 03/13/90
ANGLE AT TOP PERF: 11 @9631'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/8" 4 9631 - 9646 0 05/17/90
2-5/8" 4 9664 - 9668 0 05/06/90
2-5/8 " 4 9671 - 9682 0 05/06/90
~ 10486'
DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNrr
02/26/90 ORIGINAL COMPLETION WELL: 02-29A
01/02/01 SIS-SL T CONVERTED TO CANVAS ÆRMrr No: 1900210
02/14/01 SIS-MD FINAL API No: 50-029-22011-00
02/02/02 RNITP CORRECTIONS SEC 36, T11 N, R14E. 161.22' FEL & 5259' FNL
06/11/03 CMOrrLP KB ELEVATION CORRECTION
BP Exploration (Alaska)
TREE -
WELLHEAD =
ACTUA TOR =
KB. ELEV -
BF. ELEV =
KOP=
Max Angle =
Datum MD -
Datum lVD =
CrN GEN 4
CrN
AXELSON
62'
e
900'
29 @ 3600'
9570'
8800' SS
13-3/8" CSG, 68#,
K-55, ID = 12.415"
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I
I TOP OF 3-1/2" TBG I
13-3/8"CSG,68#,L-80,ID=12.415" I
I TOP OF 7" LNR I 8683'
13-1/2" TBG, 9.3#, L-80, .0087 bpf, 10 = 2.992" I
8740'
19-5/8" CSG, 47#, L-80, 10 = 8.681" I
ITop of Cement I
9099'
9230'
PERFORA TION SUMMARY
REF LOG: SWS CET ON 03/13/90
ANGLE AT TOP PERF: 11 @ 9631'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz OA TE
2-1/8" 4 9631-9646 isolated proposed
2-5/8" 4 9664-9668 isolated proposed
2-5/8" 4 9671-9682 isolated proposed
IPBTD I
9712'
17" LNR, 29#, L-80, .0371 bpf, 10=6.184" I
9791'
~
10486'
02-298
e
SAFETY NOTES: REDDRlLL NOT
SIDETRACKED
Proposed CTD Sidetrack
.
2239'
-i4-1/2"AVATRSV,ID=3.813" I
PORT OA TE
-13-1/2" OTIS XN NIP, milled to 10 = 2.8Q" I
3-1/2" BAKER SHEAR OUT SUB
3-1/2" TUBING TAIL W/WLEG
9485' l-i Cement Ramp Window
DATE REV BY COMMENTS DATE REV BY
02/26/90 ORIGINAL COMR.ETION
01/02/01 SIS-SL T CONVERTED TO CANVAS
02/14/01 SIS-MD FINAL
02/02/02 RN/TP CORRECTIONS
PRUDHOE BA Y UNIT
WELL: 02-29A
ÆRMITNo: 190-0210
API No: 50-029-22011-00
SEC 36 T11N R14E 161.22 FEL 5259 FNL
BP Exploration (Alaska)
COMMENTS
BP Amoco
WElI.PATH DETAJLS
PIa,n#S 02·298
$00292200202
Panllnt WeUpat.h: 02·.29A
Tie on MÐ: 9481.60
RIS:
Ref. Ditwm: 57 : 29 112211990 00:00
63.00n
V.Se.c.tiøn
Angle.
~~,~
C;~~=
0....
::::~D
33.00
350.00'
^^" --~~--~-~~---
------~--
REFERENCE INFORMATION
Co-ordìnate tN/E~ Reference: WeU Centre: 02~29A. True North
v~~~ (0~) ~:¡~~:~~:~ ~~~~ ~8N~~OÕ~)eJ
Measured Depth Reference: 57: 29 112211990 00:00 63.00
Calculation Method: M¡nîmum Curvature
St;CTION OETAU,,$
DL"'$ V1!i~G T"-rg..'
8350
.....
s::
.- 8400
5
18)8450
....
! 8500
1:1.
~ 8550
~ 8600
i 8650
::::-
c¡¡8700
! 8750
8950
LEGEND
T
Azimuths to True North
Magnetic North: 25.680
Magnetic Field
Strength: 57578nT
Dip Angle: 80.85'
Date: 8/11/2003
Model: bggm2003
Plan: Plan #9 (02-29A/Plan#9 02-298)
Created By: Srij Potnís
Date: 8111/2003
3600
3400
3200
3000
2800
.....
ª 2600
...
Õ 2400
o
~2200
-
.:t.2000
.s::
151800 .
Z
~1600
-
.s::
'5 1400
o
~1200
1000
800
600
400
200
400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600
West(-)/East(+) [200ft/in]
200 250 300 350 400 450 500 550 600 650 700 750 800 850 gOO 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800 1850 1900 1950200020502100
Vertical Section at 350.00· [50ft/in]
~l1,112.oo~ tO~56.AM
ObP
I BP-GDB
B er Hughes INTEQ Planning Rlrt
lNTßQ
Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
bggm2003
- -- - - ---- - - - --- ------- ~
---~--- -----~--~----~- -----
- ~._-----""'--"-"-""--"-""-'
Site: PB DS 02
TR-11-14
UNITED STATES: North Slope
Site Position: Northing: 5948800.37 ft
From: Map Easting: 687638.44 ft
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
Latitude: 70 15
Longitude: 148 28
North Reference:
Grid Convergence:
53.847 N
58.060 W
True
1.43 deg
..____ _~_ ___J
----------
. _._----_.,-.."----_._--~--~_...-
------,-,--_.~-----~. ._--,---~,_.,--------- .- ---...--------------
Well: 02-29A Slot Name: 29
02-29A
Well Position: +N/-S 1514.17 ft Northing: 5950336.13 ft Latitude: 70 16 8.739 N
+E/-W 888.73 ft Easting : 688489.10 ft Longitude: 148 28 32.190 W
Position 0.00 ft
+N/-S
ft
0.00
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
02-29A
9481.60 ft
Mean Sea Level
25.68 deg
80.85 deg
Direction
Wellpath: Plan#9 02-298
500292200202
Current Datum: 57: 29 1/22/199000:00
Magnetic Data: 8/11/2003
Field Strength: 57578 nT
Vertical Section: Depth From (TVD)
ft
33.00
Height 63.00 ft
350.00
---~--_._-------------
-----
-.-."... -----_._----_._--,._--"--------~--_._-'_._-----------
Targets
Nåme
02-29B Polygon9.1 0.00 985.28 3033.70 5951397.00 691497.00 70 16 18.423 N 148 27 3.870 W
-Polygon 1 0.00 985.28 3033.70 5951397.00 691497.00 70 16 18.423 N 148 27 3.870 W
-Polygon 2 0.00 1945.82 2946.72 5952355.00 691386.00 70 16 27.870 N 148 27 6.391 W
-Polygon 3 0.00 2302.89 2669.56 5952705.00 691100.00 70 1631.383 N 148 27 14.457 W
-Polygon 4 0.00 2949.95 2716.78 5953353.00 691131.00 70 16 37.747 N 148 27 13.076 W
-Polygon 5 0.00 2920.46 3175.21 5953335.00 691590.00 70 16 37.455 N 148 26 59.726 W
-Polygon 6 0.00 2488.53 2966.32 5952898.00 691392.00 70 16 33.208 N 148 27 5.814 W
-Polygon 7 0.00 2032.95 3422.08 5952454.00 691859.00 70 16 28.725 N 148 26 52.549 W
-Polygon 8 0.00 1186.75 3616.96 5951613.00 692075.00 70 16 20.402 N 148 2646.887 W
02-29B Fault 1 0.00 1681.69 2708.02 5952085.00 691154.00 70 16 25.273 N 148 27 13.344 W
-Polygon 1 0.00 1681.69 2708.02 5952085.00 691154.00 70 16 25.273 N 148 27 13.344 W
-Polygon 2 0.00 1648.51 3553.51 5952073.00 692000.00 70 16 24.944 N 148 26 48.728 W
02-29B Fault 2 0.00 1680.37 2241.81 5952072.00 690688.00 70 16 25.262 N 148 27 26.918 W
-Polygon 1 0.00 1680.37 2241.81 5952072.00 690688.00 70 16 25.262 N 148 27 26.918 W
-Polygon 2 0.00 1653.41 2519.24 5952052.00 690966.00 70 16 24.996 N 148 27 18.841 W
-Polygon 3 0.00 1424.70 2863.64 5951832.00 691316.00 70 16 22.745 N 148 27 8.816 W
-Polygon 4 0.00 1653.41 2519.24 5952052.00 690966.00 70 16 24.996 N 148 27 18.841 W
02-29B Fault 5 0.00 2416.91 2590.39 5952817.00 691018.00 70 16 32.505 N 148 27 16.762 W
-Polygon 1 0.00 2416.91 2590.39 5952817.00 691018.00 70 16 32.505 N 148 27 16.762 W
-Polygon 2 0.00 2168.85 2629.19 5952570.00 691063.00 70 16 30.065 N 148 27 15.634 W
02-29B Fault 6 0.00 2308.36 2251.54 5952700.00 690682.00 70 16 31.438 N 148 27 26.629 W
-Polygon 1 0.00 2308.36 2251.54 5952700.00 690682.00 70 1631.438 N 148 27 26.629 W
-Polygon 2 0.00 2033.70 2353.70 5952428.00 690791.00 70 16 28.737 N 148 27 23.657 W
02-29B Fault 4 0.00 2469.90 3070.89 5952882.00 691497.00 70 16 33.024 N 148 27 2.769 W
-Polygon 1 0.00 2469.90 3070.89 5952882.00 691497.00 70 16 33.024 N 148 27 2.769 W
-Polygon 2 0.00 2330.84 3430.55 5952752.00 691860.00 70 1631.655 N 148 26 52.299 W
- - ----------------------------------------.-.--- -----..-.-.------------.---- ..-
ObP
I BP-GDB
B er Hughes INTEQ Planning R'rt
B.-
8A~
IllIG'"
IN'tEQ
02-29B Fault 3
-Polygon 1
-Polygon 2
02-29B Fault 8
-Polygon 1
-Polygon 2
02-29B Fault 7
-Polygon 1
-Polygon 2
02-298 T9.6
02-29B T9.5
02-298 T9.4
02-298 T9.3
02-298 T9.2
02-29B T9.1
Annotation
MD
ft
9481.60
9485.00
9499.00
9719.53
9819.53
9969.53
10069.53
10169.53
10219.53
10419.53
10569.53
10719.53
10844.53
10969.53
11119.53
11294.53
11400.00
8713.14
8716.48
8730.11
8855.88
8855.88
8848.27
8840.08
8833.88
8830.60
8814.16
8803.80
8797.60
8794.42
8793.32
8790.71
8784.91
8781.26
---------------------'-
0.00 1814.22 2569.29 5952214.00 691012.00
0.00 1814.22 2569.29 5952214.00 691012.00
0.00 1820.25 2887.56 5952228.00 691330.00
0.00 1512.65 4025.28 5951949.00 692475.00
0.00 1512.65 4025.28 5951949.00 692475.00
0.00 1251.76 4096.77 5951690.00 692553.00
0.00 1898.13 3891.88 5952331.00 692332.00
0.00 1898.13 3891.88 5952331.00 692332.00
0.00 2427.53 4243.27 5952869.00 692670.00
8781.00 2580.23 2859.58 5952987.00 691283.00
8793.00 2179.73 2993.60 5952590.00 691427.00
8814.00 1674.02 3214.02 5952090.00 691660.00
8834.00 1444.85 3257.30 5951862.00 691709.00
8848.00 1252.40 3312.50 5951671.00 691769.00
8856.00 1100.03 3324.69 5951519.00 691785.00
---------
...--- "- -----_._-------_._--_.~--_..._-------------------------------.
TIP
KOP
3
4
5
6
7
8
9
10
11
12
13
14
15
16
TO
Plan: Plan #9
Identical to Lamar's Plan #9
Principal: Yes
Date Composed:
Version:
Tied-to:
70 16 26.577 N 148 27 17.382 W
70 16 26.577 N 148 27 17.382 W
70 16 26.635 N 148 27 8.115 W
70 16 23.605 N 148 26 34.994 W
70 16 23.605 N 148 26 34.994 W
70 16 21.039 N 148 26 32.917 W
70 16 27.397 N 148 26 38.872 W
70 16 27.397 N 148 26 38.872 W
70 16 32.602 N 148 26 28.632 W
70 1634.110 N 148 27 8.921 W
70 1630.170 N 148 27 5.024 W
70 1625.196 N 148 26 58.612 W
70 16 22.942 N 148 26 57.355 W
70 16 21.049 N 148 26 55.750 W
70 16 19.550 N 148 26 55.397 W
~ _._.__.._.,----~----- _.-._------------
5/8/2003
5
From: Definitive Path
------------,
-.-----------------------
___~__..·_.M""_._'____·__·___________··__m'._·____·___.-_
Plan Section Information
9481.60 10.83 68.99 8713.14 853.96 3196.75 0.00 0.00 0.00 0.00
9485.00 10.83 68.93 8716.48 854.19 3197.34 0.33 0.00 -1.76 269.97
9499.00 15.71 56.70 8730.11 855.70 3200.16 40.00 34.82 -87.38 324.00
9719.53 90.00 21.73 8855.88 996.49 3278.07 35.00 33.69 -15.86 324.00
9819.53 90.00 9.73 8855.88 1092.57 3305.13 12.00 0.00 -12.00 270.00
9969.53 95.77 352.65 8848.27 1241.72 3308.28 12.00 3.85 -11.39 289.00
10069.53 93.58 340.81 8840.08 1338.55 3285.43 12.00 -2.19 -11.84 260.00
10169.53 93.50 352.83 8833.88 1435.55 3262.72 12.00 -0.08 12.02 90.00
ObP
I BP-GDB .
B er Hughes INTEQ Planning RèJlórt
B..
...-
......
[NTEQ
Plan Section Information
10219.53 94.01 358.82 8830.60 1485.28 3259.09 12.00 1.01 11.98 85.00
10419.53 95.29 334.78 8814.16 1677.92 3213.95 12.00 0.64 -12.02 274.00
10569.53 92.57 352.62 8803.80 1820.97 3172.15 12.00 -1.81 11.89 98.00
10719.53 92.13 334.61 8797.60 1964.16 3130.04 12.00 -0.29 -12.01 269.00
10844.53 90.77 319.66 8794.42 2068.81 3062.41 12.00 -1.09 -11.95 265.00
10969.53 90.23 334.65 8793.32 2173.53 2994.82 12.00 -0.43 11.99 92.00
11119.53 91.76 352.59 8790.71 2316.83 2952.70 12.00 1.02 11.96 85.00
11294.53 92.00 331.58 8784.91 2482.33 2899.20 12.00 0.14 -12.01 271.00
11400.00 91.95 344.25 8781.26 2579.80 2859.65 12.00 -0.05 12.01 90.00
Survey
MD
ft
9481.60 10.83 68.99 8713.14 853.96 3196.75 5951269.82 691663.27 285.88 0.00 0.00 TIP
9485.00 10.83 68.93 8716.48 854.19 3197.34 5951270.06 691663.86 286.00 0.33 269.97 KOP
9499.00 15.71 56.70 8730.11 855.70 3200.16 5951271.64 691666.63 287.00 40.00 324.00 3
9500.00 15.99 55.95 8731.07 855.86 3200.38 5951271.80 691666.86 287.11 35.00 324.00 MWD
9525.00 23.66 43.30 8754.58 861.45 3206.69 5951277.55 691673.02 291.52 35.00 324.72 MWD
9550.00 31.88 36.75 8776.69 870.40 3214.09 5951286.69 691680.20 299.06 35.00 336.65 MWD
9555.13 33.59 35.77 8781.00 872.64 3215.73 5951288.96 691681.78 300.98 35.00 342.46 02-29B
9569.98 38.59 33.38 8793.00 879.85 3220.69 5951296.29 691686.55 307.21 35.00 343.29 02-29B
9575.00 40.30 32.68 8796.88 882.52 3222.43 5951299.01 691688.22 309.54 35.00 345.22 MWD
9598.98 48.47 29.93 8814.00 896.85 3231.11 5951313.55 691696.54 322.15 35.00 345.76 02-29B
9600.00 48.82 29.83 8814.68 897.51 3231.49 5951314.22 691696.91 322.74 35.00 347.73 MWD
9625.00 57.39 27.64 8829.67 915.04 3241.07 5951331.98 691706.05 338.33 35.00 347.80 MWD
9633.36 60.26 27.01 8834.00 921.39 3244.36 5951338.41 691709.17 344.02 35.00 349.11 02-29B
9650.00 66.00 25.84 8841.52 934.68 3250.95 5951351.86 691715.44 355.96 35.00 349.44 MWD
9668.21 72.28 24.68 8848.00 950.06 3258.21 5951367.42 691722.30 369.85 35.00 349.97 02-296
9675.00 74.62 24.27 8849.93 955.99 3260.90 5951373.41 691724.85 375.21 35.00 350.38 MWD
9700.00 83.25 22.82 8854.73 978.46 3270.69 5951396.12 691734.07 395.64 35.00 350.50 MWD
9719.53 90.00 21.73 8855.88 996.49 3278.07 5951414.32 691741.00 412.12 35.00 350.78 4
9725.00 90.00 21.07 8855.88 1001.58 3280.07 5951419.47 691742.87 416.79 12.00 270.00 MWD
9750.00 90.00 18.07 8855.88 1025.14 3288.44 5951443.22 691750.65 438.53 12.00 270.00 MWD
9775.00 90.00 15.07 8855.88 1049.09 3295.57 5951467.35 691757.17 460.89 12.00 270.00 MWD
9800.00 90.00 12.07 8855.88 1073.39 3301.44 5951491.79 691762.43 483.80 12.00 270.00 MWD
9819.53 90.00 9.73 8855.88 1092.57 3305.13 5951511.05 691765.64 502.04 12.00 270.00 5
9825.00 90.21 9.11 8855.87 1097.97 3306.03 5951516.47 691766.40 507.20 12.00 289.00 MWD
9850.00 91.19 6.27 8855.56 1122.74 3309.37 5951541.31 691769.12 531.01 12.00 289.00 MWD
9875.00 92.16 3.43 8854.83 1147.63 3311.48 5951566.25 691770.61 555.17 12.00 288.96 MWD
9900.00 93.13 0.59 8853.67 1172.59 3312.36 5951591.22 691770.86 579.59 12.00 288.88 MWD
9925.00 94.09 357.74 8852.10 1197.53 3311.99 5951616.15 691769.87 604.22 12.00 288.75 MWD
9950.00 95.04 354.88 8850.11 1222.40 3310.39 5951640.96 691767.65 628.99 12.00 288.57 MWD
9969.53 95.77 352.65 8848.27 1241.72 3308.28 5951660.23 691765.05 648.38 12.00 288.34 6
9975.00 95.66 352.00 8847.72 1247.12 3307.55 5951665.60 691764.19 653.82 12.00 260.00 MWD
10000.00 95.13 349.03 8845.37 1271.67 3303.45 5951690.04 691759.48 678.71 12.00 259.94 MWD
10025.00 94.58 346.07 8843.26 1295.99 3298.08 5951714.22 691753.50 703.59 12.00 259.66 MWD
10050.00 94.03 343.12 8841.38 1320.02 3291.46 5951738.07 691746.28 728.41 12.00 259.41 MWD
10069.53 93.58 340.81 8840.08 1338.55 3285.43 5951756.44 691739.78 747.70 12.00 259.18 7
10075.00 93.58 341.47 8839.74 1343.71 3283.66 5951761.56 691737.89 753.10 12.00 90.00 MWD
10100.00 93.58 344.47 8838.18 1367.57 3276.36 5951785.23 691729.99 777.86 12.00 90.04 MWD
10125.00 93.56 347.48 8836.63 1391.77 3270.31 5951809.27 691723.34 802.75 12.00 90.23 MWD
10150.00 93.53 350.49 8835.08 1416.26 3265.54 5951833.63 691717.96 827.69 12.00 90.42 MWD
10169.53 93.50 352.83 8833.88 1435.55 3262.72 5951852.84 691714.65 847.17 12.00 90.60 8
10175.00 93.56 353.49 8833.54 1440.97 3262.07 5951858.24 691713.87 852.63 12.00 85.00 MWD
- - - -~-------~--------~._--_. ._~------~~~.._._---~..,~---_._.- -------......-....-------
ObP
I BP-GDB .
B er Hughes INTEQ Planning RèJ'&rt
Bii.
BA_
IIUG".
--.---.;;,.'---...---
INTEQ
Survey
93.82 356.48 8831.93 1465.82 3259.89 5951883.03 691711.06 877 .48 12.00 85.04 MWD
94.01 358.82 8830.60 1485.28 3259.09 5951902.46 691709.78 896.78 12.00 85.23 9
94.05 358.17 8830.22 1490.74 3258.94 5951907.92 691709.50 902.18 12.00 274.00 MWD
94.25 355.17 8828.41 1515.63 3257.50 5951932.76 691707.43 926.95 12.00 273.95 MWD
10275.00 94.44 352.16 8826.51 1540.40 3254.75 5951957.45 691704.06 951.82 12.00 273.74 MWD
10300.00 94.62 349.16 8824.53 1564.99 3250.70 5951981.93 691699.40 976.74 12.00 273.51 MWD
10325.00 94.79 346.15 8822.48 1589.33 3245.38 5952006.13 691693.47 1001.63 12.00 273.27 MWD
10350.00 94.94 343.15 8820.37 1613.35 3238.78 5952029.97 691686.28 1026.43 12.00 273.02 MWD
10375.00 95.08 340.14 8818.18 1636.98 3230.94 5952053.40 691677.85 1051.07 12.00 272.77 MWD
10400.00 95.20 337.13 8815.94 1660.17 3221.87 5952076.35 691668.20 1075.47 12.00 272.51 MWD
10419.53 95.29 334.78 8814.16 1677.92 3213.95 5952093.90 691659.83 1094.34 12.00 272.24 10
10425.00 95.20 335.43 8813.66 1682.87 3211.66 5952098.79 691657.42 1099.60 12.00 98.00 MWD
10450.00 94.77 338.41 8811.49 1705.78 3201.89 5952121.44 691647.09 1123.86 12.00 98.06 MWD
10475.00 94.33 341.39 8809.51 1729.18 3193.33 5952144.62 691637.94 1148.39 12.00 98.32 MWD
10500.00 93.88 344.36 8807.72 1753.01 3185.99 5952168.26 691630.00 1173.13 12.00 98.55 MWD
10525.00 93.41 347.33 8806.13 1777.20 3179.89 5952192.28 691623.30 1198.01 12.00 98.77 MWD
10550.00 92.94 350.30 8804.74 1801.68 3175.05 5952216.64 691617.85 1222.97 12.00 98.96 MWD
10569.53 92.57 352.62 8803.80 1820.97 3172.15 5952235.85 691614.47 1242.46 12.00 99.12 11
10575.00 92.56 351.96 8803.56 1826.39 3171.42 5952241.24 691613.60 1247.93 12.00 269.00 MWD
10600.00 92.50 348.96 8802.45 1851.01 3167.28 5952265.76 691608.85 1272.90 12.00 268.97 MWD
10625.00 92.43 345.95 8801.38 1875.39 3161.85 5952289.99 691602.81 1297.85 12.00 268.84 MWD
10650.00 92.36 342.95 8800.33 1899.45 3155.16 5952313.88 691595.52 1322.71 12.00 268.71 MWD
10675.00 92.29 339.95 8799.32 1923.13 3147.21 5952337.35 691586.98 1347.41 12.00 268.58 MWD
10700.00 92.20 336.95 8798.34 1946.36 3138.04 5952360.34 691577.23 1371.88 12.00 268.46 MWD
10719.53 92.13 334.61 8797.60 1964.16 3130.04 5952377.93 691568.78 1390.79 12.00 268.34 12
10725.00 92.08 333.95 8797.40 1969.08 3127.66 5952382.79 691566.29 1396.06 12.00 265.00 MWD
10750.00 91.81 330.96 8796.55 1991.24 3116.11 5952404.65 691554.18 1419.88 12.00 264.98 MWD
10775.00 91.54 327.97 8795.82 2012.76 3103.41 5952425.84 691540.96 1443.28 12.00 264.87 MWD
10800.00 91.27 324.98 8795.21 2033.59 3089.61 5952446.32 691526.64 1466.19 12.00 264.79 MWD
10825.00 90.99 322.00 8794.71 2053.68 3074.74 5952466.03 691511.27 1488.55 12.00 264.71 MWD
10844.53 90.77 319.66 8794.42 2068.81 3062.41 5952480.85 691498.57 1505.60 12.00 264.66 13
10850.00 90.75 320.32 8794.34 2073.01 3058.89 5952484.95 691494.94 1510.34 12.00 92.00 MWD
10875.00 90.64 323.32 8794.04 2092.65 3043.44 5952504.21 691479.01 1532.37 12.00 92.01 MWD
10900.00 90.53 326.32 8793.78 2113.08 3029.04 5952524.27 691464.10 1554.99 12.00 92.04 MWD
10925.00 90.42 329.31 8793.58 2134.24 3015.73 5952545.08 691450.26 1578.14 12.00 92.08 MWD
10950.00 90.31 332.31 8793.42 2156.06 3003.54 5952566.59 691437.53 1601.75 12.00 92.10 MWD
10969.53 90.23 334.65 8793.32 2173.53 2994.82 5952583.84 691428.37 1620.47 12.00 92.12 14
10975.00 90.28 335.31 8793.30 2178.49 2992.50 5952588.74 691425.94 1625.75 12.00 85.00 MWD
11000.00 90.54 338.30 8793.12 2201.47 2982.66 5952611.46 691415.52 1650.09 12.00 85.00 MWD
11025.00 90.80 341.29 8792.83 2224.92 2974.02 5952634.69 691406.30 1674.69 12.00 85.02 MWD
11050.00 91.06 344.27 8792.42 2248.80 2966.62 5952658.37 691398.31 1699.48 12.00 85.06 MWD
11075.00 91.31 347.26 8791.90 2273.02 2960.48 5952682.43 691391.56 1724.41 12.00 85.11 MWD
11100.00 91.56 350.26 8791.27 2297.53 2955.61 5952706.81 691386.08 1749.39 12.00 85.17 MWD
11119.53 91.76 352.59 8790.71 2316.83 2952.70 5952726.03 691382.68 1768.90 12.00 85.25 15
11125.00 91.77 351.93 8790.54 2322.25 2951.96 5952731.43 691381.81 1774.37 12.00 271.00 MWD
11150.00 91.82 348.93 8789.76 2346.89 2947.81 5952755.95 691377.04 1799.35 12.00 270.98 MWD
11175.00 91.86 345.93 8788.96 2371.27 2942.37 5952780.19 691371.00 1824.31 12.00 270.89 MWD
11200.00 91.90 342.93 8788.13 2395.34 2935.67 5952804.08 691363.69 1849.18 12.00 270.79 MWD
11225.00 91.93 339.93 8787.30 2419.02 2927.71 5952827.56 691355.15 1873.88 12.00 270.69 MWD
11250.00 91.96 336.93 8786.45 2442.26 2918.53 5952850.55 691345.38 1898.36 12.00 270.59 MWD
11275.00 91.98 333.93 8785.59 2464.98 2908.14 5952873.00 691334.43 1922.54 12.00 270.49 MWD
11294.53 92.00 331.58 8784.91 2482.33 2899.20 5952890.12 691325.06 1941.17 12.00 270.39 16
11300.00 92.00 332.24 8784.72 2487.15 2896.63 5952894.88 691322.37 1946.37 12.00 90.00 MWD
--~~------_.".._-~- -------~--- _"m___~_~"'_"'~___"""__~_______
, ,
ObP
11325.00
11350.00
11375.00
11400.00
91.99
91.99
91.97
91.95
I BP-GDB .
Ba er Hughes INTEQ Planning Rèjrórt
B..
.~..."
JUG
IN'tEQ
335.24
338.24
341.24
344.25
8783.85
8782.98
8782.11
8781.26
2509.55
2532.51
2555.94
2579.80
2885.58
2875.71
2867.06
2859.65
5952917.00
5952939.70
5952962.91
5952986.57
691310.76
691300.32
691291.09
691283.08
1970.35
1994.67
2019.25
2044.04
12.00
12.00
12.00
12.00
90.02 MWD
90.13 MWD
90.23 MWD
90.34 TD
,f!. "
, ,
Nordic 1 big hole
All Measurements are from top of Riser
~
Q)
C/)
.-
a:
top of bag
bttm of bag
middle of slips
Blind/Shears
..........................
middle of pipes
7/28/2003
BAG
71/16" 5000psi
TOTs
......................····7 1/16" 5000psi
middle of flow cross
Mud Cross
middle of blindlshears
..........................
middle of pipelslips
..........................
Flow Tee
Mud Cross
7 1/16" 5000psi
TOTs /
7 1/16" 5000psi
p055118
DATE
7/14/2003
CHECK NO.
055118
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
NET
7/14/2003 INV# PR071003H
PERMIT TO DRILL FEE
0;;1.- :2..CfS
H
e
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
e
II' 0 5 5 i L B III I: 0... i 20 3 B ~ 51: 0 i 2 ? B ~ bllD
e
e
TRANSMJT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERJPARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
PTD#
CHECK WHAT ADD-ONS "CLUE"
APPLIES (OPTIONS)
MULTI Tbe permit is for a new well bore segment of
LATERAL existing well-,
Permit No, API No. .
(If API number Production sbould continue to be reported as
last two (2) digits a function' of tbe original API number stated
are between 60-69) above.
Pn.,OT HOLE In accordance with 20 AAC 25.005(1), all
(PH) records, data and logs acquired for tbe pilot
bole must be clearly differentiated in both
name (name on permit plus PH)
. and API number (50 -
70/80) from records, data and logs acquired
for well (name on permit).
SPACING Tbe permit is approved subject to full
EXCEPTION compliance witb 20 AAC 25.055. Approval to
peñorate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Companv Name) assumes the liability of any
protest to tbe spacing . exception tbat may
occur.
DRY DITCH All dry ditch sample sets submitted to the
SAMPLE Commission must be in no greater than 30'
sample intervals from below tbe permafrost
or from wbere samples are first caught and
10' sample intervals tbrougb target zones.
Rev: 07/10/02
C\jody\templates
Company INC Well Name: PRUDHOE BAY UNIT 02-2~ Program DEV Well bore seg D
PTD#: 2031460 Field & Pool IL - 640150 nitial ClasslType DEV 11-01L GeoArea 890 Unit 11650 On/Off Shore ~ Annular Disposal D
Administration P~rmit fee attache.d _ . Y~s. . - - - - - - -
2 .Leas~ .numberapprORriate. Y~s. - - - - - -
3 .U.nlque weltn.arn~.aod Ol!mb.er - - - - - - - .Y~s. . - - - - - - - - - - - - - - - - - - - -
4 WeB loc¡¡ted in.a. define~pool. - - - - - - - Y~s. - - - - - -
5 Wellloc¡¡ted pr.operdistance from driJling unit boundary . . . . _ . . Yes. - - - - - - -
6 WeB loc¡¡ted proper .dlstance_ from other weHs. . . . . . . Yes. - - - - - - - - - - -
7 Sufficientacreag.e.ayailable [ndrilliog unjt _ . Yes. - - - - - - - -
8 Ifdeviated, js weJlbore pl¡:;¡tincJuded . . . . . . . . . Y~s - - - - - - - - - - - -
'9 .Operator onl)' affected party. . . . . . . . . . . . . . . Yes. . - - - - - -
10 .Operator has.apprppriate. b.ond tnJorce . . . . . . . _ . . . . . . Yes. . - - - - - - - - - - - -
11 Permit can be lSSl!ep wjthout conservation order. Y~s. . - - - - - - - - - - - -
Appr Date 12 Permit~an be tssu.ep without administrati\(e.apprpval . Yes.
RPC 8/21/2003 13 Can permit be approved before 15-day wait Yes e
114 WeJIJoc¡¡ted within area and.strat¡¡authorlzed by.lnjectiPIJ Order # (put 10# in.cprnrnents) (For NA - - - - - - - - - - - - - -
15 .AJI weHs.withtn .1l4.mite.are.a.of reyiew id~ot[fied (Fpr servjc.ewell onl)'). . . . .. .. .. .. NA .. - - - - - - - - - - - - - - - - - --
16 Pre-produ.ced injector; ~uratio.n.of pre-pro~uc;tion tess than.:3 months (Forservi,ce well onJy) . . NA - - - - - - - - - - - - -
17 ACMP finding.of Con.ststenc;y.has beenissued. forthis project. . . . . . . . . . . . . . . . . . . NA . . - - - - - -
Engineering 18 .C.ooductor string provided . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - NA .. - - - - - - - - -
19 .S.urfacec¡:;¡singprote~ts alLknown USQWs . ........ _. _........ NA... - - - - - - - - - - - -
20 .GMT vol adeQl!ate. to circulate onconduçtor. & surf. C$g . ................. _ .NA.
21 .CMT v.ol adeQl!ateto tie-i,nJong .string to surf csg. . . . . . - - - - - - - - - - - - .... NA - - - - - - - - - - - - - - - -
22 CMTwill c;oyer.a]l!<nown.produc;tiye horizon.s. . _ Yes. - - - - - - - - -
23 Casing de.signs ad.etluate fpr C,T" B.&.Rermafrost . . . . . . _ . . _ _ .......... _ _ _ _ Yes.
24 .A~equatetankageor re.serve pit. . . . . . . . . . . . - - - - - - - - - - - - - - . . . . . . . Y~s cmu.
25 Jfare-~riIL has.a_ 10-403 for abanpon.me.nt be~1J ¡¡PPJoved . . . . . . . . . . . . _ . _ _ . . Y~s. 6/21-'2003. . . . . . . . . . _ _ _
26 .A~equateweUbore. separ¡¡tio.npropose~. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes. . ~ - - - - - - - - - - - - - - - - - -
27 Ifdivecterrequired, does itmeet regulations. . . . . . . . . . . . . . . . . . . _ NA .. Sipetrack.. . . . . .
Appr Date 28 .DrillilJg flujd Rrog.ram s~hematic_& equip Jistapequ¡¡te. . . . Y~s _ . Max MW8, 7. ppg.. . .
WGA 8/21/2003 29 BOPEs, do they meel.regulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes. - - - - e
30 .BQPE.pre.ssrating appropriate;testto.(put psig tn.comments) . . . . . . . . . . . . . _ . . . . . Yes Te.st to 3500 RSi. .MSF' 2669 psi
31 .C.hokemanifold complies w/APt RF'-53 (May 64). - - - - - - - - - - - ......... Yes..
32 Work wiU pc;C.ur withoutoper¡:;¡tion .sbutdown - - - - - ~ ............. _ Yes..
33 Is presence of H2S gas. Rrob.able. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes. . 100ppm,
34 Me.chanlc¡¡I.C9lJdjt[oo pf we.lIs within 8.08 verified (For service w~1J only). NA
Geology 35 Pßrmit can Þe tssu.ed wlo hydrogen su[fipe meaS.U(es. . . . . . . _ . . _ . . . . . . . . . . . . _ . No.
36 .D.ata.preselJted Qn. pote.ntial PveJpres.sure .zones. . . . . . . . . . ....... _... .NA
Appr Date 37 .Setsr:nic.analysjs of shallow gas.zPlJes ..NA ..
- - - - - - - - - - - - - -
RPC 8/21/2003 38 Seabep _condjtjpo survey.(if Off-sh.ore) . . . . . . . . . . . _ _ . . . . . .NA
39 . CQntact namelphoneJor.weelsly progress.reRorts [explor¡¡tpry .0nlYl _ . . . .. ..NA .
-
- Public ~ ~ t? %
Geologic Date: Engineering Date Commissioner Date ~
Commissioner: Commissioner:
Dr.$' f/ ~/\?
e
e
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding infoffilation, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.
.
~
p')
~'\~? ~3 -116
**** REEL HEADER ****
MWD
04/11/02
$' ~ì--- ð~9
BHI
01
LIS Customer Format Tape
. ·EC· EIVED
R .
1 ?f\Oå
, '.... !-\liJ ,
**** TAPE HEADER ****
MWD
04/11/02
A!ælœO" & Gas Cons- Comm\5~¡µn
AnC110mge
4580841
01
2.375" CTK
*** LIS COMMENT RECORD
***
!!!!!!!!!!!!!!!!!! !
!!!!!!!!!!!!!!!!!! !
-Version Information
VERSo
WRAP.
-Well Information Block
#MNEM.UNIT Data Type
#--------- -------------
STRT.FT 9430.0000:
STOP.FT 10707.0000:
STEP.FT 0.5000:
NULL. -999.2500:
COMPo COMPANY:
WELL. WELL:
FLD . FIELD:
LOC . LOCATION:
CNTY. COUNTY:
STAT. STATE:
SRVC. SERVICE COMPANY:
TOOL. TOOL NAME & TYPE:
DATE. LOG DATE:
API . API NYUMBER:
-Parameter Information Block
#MNEM.UNIT Value
#--------- -------------------------
SECT. 34
TOWN.N 11N
RANG. 14E
PDAT. MSL
EPD .F 0
LMF . RKB
FAPD.F 63
DMF KB
EKB .F 63
EDF .F N/A
EGL .F N/A
CASE.F N/A
OSl . DIRECTIONAL
-Remarks
(1) All depths are Measured Depths (MD) unless otherwise noted.
(2) All depths are Bit Depths unless otherwise noted.
(3) All Gamma Ray data (GRAX) presented is real time data.
(4) Baker Hughes INTEQ utilized Coiltrak downhole tools and ADVANTAGE
surface system.
Remark File Version 1.000
Extract File: ldwg.las
1. 20:
NO:
CWLS log ASCII Standard -VERSION 1.20
One line per frame
Information
-------------------------------
Starting Depth
Ending Depth
Level Spacing
Absent Value
BP Exploration (Alaska), Inc.
02-29B
Prudhoe Bay Unit
70 deg 16' 8.739"N, 148 deg 28' 32.190"W
North Slope
Alaska
Baker Hughes INTEQ
1.75" NaviGamma - Gamma Ray
22-Nov-03
500292201102
Description
-------------------------------
Section
Township
Range
Permanent Datum
Elevation Of Perm. Datum
Log Measured from
Feet Above Perm. Datum
Drilling Measured From
Elevation of Kelly Bushing
Elevation of Derrick Floor
Elevation of Ground Level
Casing Depth
Other Services Line 1
.
.
(5) Tool ran in the tool string included Casing Collar Locator, Electrical Disconnect
and Circulating Sub, a Drilling Performance Sub, and a Hydrolic Orienting Sub
with a near bit inclination sensor.
(6) The data presented here is final and was not depth shifted to a PDC
(Primary Depth Control) as per BPX Recomendation.
(7) The sidetrack was drilled from milled window in 4 1/2 inch liner.
Top of Window: 9444' MD (8676' SSTVD)
Bottom of Window: 9450' MD (8682' SSTVD)
(8) The interval from 10680' to 10707' MD (8811' to 8810' SSTVD) was not logged due
to the sensor offset.
(9) Tied in to 02-29A at 9028' MD
MNEMONICS:
GRAX -> Gamma Ray MWD-API [MWD] (MWD-API units)
ROPS -> Rate of Penetration, feet/hour
TVD -> Subsea True Vertical Depth, feet
Tape Subfile: 1
61 records...
Minimum record length:
Maximum record length:
14 bytes
132 bytes
**** FILE HEADER ****
MWD .001
1024
*** INFORMATION TABLE: CONS
MNEM VALU
------------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
02-29B-PB1 5.xtf
150
BP Exploration (Alaska) Inc.
02-29B
Prudhoe Bay Unit
North Slope
Alaska
***
LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
The data presented here is final and has not been depth shifted
to a PDC (Primary Depth Control). Per BP Exploration instructions,
the MWD Gamma Ray is the PDC for this borehole.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
----------------------------------------------------
GR
ROP
GR
ROP
GAAX
ROPA
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.500000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is: 1
.
.
FRAME SPACE =
0.500 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
Size Length
1
2
68
68
4
4
1
1
AAPI
F/HR
4
4
GR
ROP
MWD
MWD
-------
8
Total Data Records: 31
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9430.000000
10707.000000
0.500000
feet
**** FILE TRAILER ****
Tape Subfile: 2 40 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** FILE HEADER ****
MWD .002
1024
*** INFORMATION TABLE: CONS
MNEM VALU
--------------------------------
WDFN
LCC
CN
WN
FN
COUN
STAT
02-29B-PB1.xtf
150
BP Exploration (Alaska)
02-29B
Prudhoe Bay Unit
North Slope
Alaska
*** LIS COMMENT RECORD ***
!!!!!!!!!!!!!!!!!!! Remark File Version 1.000
This file contains the raw-unedited field data.
*** INFORMATION TABLE: CIFO
MNEM CHAN DIMT CNAM
ODEP
GR
ROP
----------------------------------------------------
GRAX
ROPA
GR
ROP
0.0
0.0
* FORMAT RECORD (TYPE# 64)
Data record type is: 0
.
.
Datum Frame Size is: 12 bytes
Logging direction is down (value= 255)
Optical Log Depth Scale Units: Feet
Frame spacing: 0.250000
Frame spacing units: [F ]
Number of frames per record is: 84
One depth per frame (value= 0)
Datum Specification Block Sub-type is:
1
FRAME SPACE =
0.250 * F
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
Size Length
1
2
GR
ROP
MWD
MWD
68
68
1
1
AAPI
F/HR
4
4
4
4
-------
8
Total Data Records: 61
Tape File Start Depth
Tape File End Depth
Tape File Level Spacing
Tape File Depth Units
9429.750000
10706.250000
0.250000
feet
**** FILE TRAILER ****
Tape Subfile: 3 70 records...
Minimum record length:
Maximum record length:
54 bytes
4124 bytes
**** TAPE TRAILER ****
MWD
04/11/02
4580841
01
**** REEL TRAILER ****
MWD
04/11/02
BHI
01
Tape Subfile: 4
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
Tape Subfile 1 is type: LIS
.
.
.
.
Tape Subfile 2 is type: LIS
DEPTH GR ROP
9430.0000 28.9400 28.0000
9430.5000 13.1300 28.4400
9500.0000 22.6400 88.4100
9600.0000 51.6100 82.3100
9700.0000 41. 8000 157.0800
9800.0000 94.2600 93.6300
9900.0000 45.3800 86.3300
10000.0000 44.3100 94.8800
10100.0000 30.0100 127.3000
10200.0000 33.0000 134.1600
10300.0000 29.7800 99.7800
10400.0000 161.5900 85.8400
10500.0000 28.5900 15.8100
10600.0000 44.6400 22.7000
10700.0000 -999.2500 111. 6500
10707.0000 -999.2500 -999.2500
Tape File Start Depth 9430.000000
Tape File End Depth 10707.000000
Tape File Level Spacing 0.500000
Tape File Depth Units feet
.
.
Tape Subfile 3 is type: LIS
DEPTH GR ROP
9429.7500 -999.2500 -999.2500
9430.0000 28.9400 28.0000
9500.0000 23.7000 87.1500
9600.0000 51.5600 79.5500
9700.0000 41.3350 158.4600
9800.0000 117.4100 124.2800
9900.0000 44.2200 86.7200
10000.0000 45.3700 92.2200
10100.0000 29.9982 129.4600
10200.0000 33.8500 132.8900
10300.0000 30.8650 96.4400
10400.0000 166.3100 107.5300
10500.0000 29.6100 14.9300
10600.0000 40.8150 29.7100
10700.0000 -999.2500 111.7600
10706.2500 -999.2500 83.9600
Tape File Start Depth 9429.750000
Tape File End Depth 10706.250000
Tape File Level Spacing 0.250000
Tape File Depth Units feet
... J t"
Tape Subfile 4 is type: LIS
.
.